HomeMy WebLinkAbout213-130 Image Project Well History File Cover Page
XHVZE
This page identifies those items that were not scanned during the initial production scanning phase.
They are available in the original file, may be scanned during a special rescan activity or are viewable
by direct inspection of the file.
Z3 - 13 Q Well History File Identifier
Organizing (done) ti-sided ❑ Rescan Needed
RES AN: OVERSIZED: NOTES:
Co Items: ❑ Maps:
Grayscale Items: ogs:
❑ Poor Quality Originals: ❑ Other:
❑ Other:
BY: 105 Date: 915 6— Is! 64P
Project Proofing
BY: 1113, Date: 3/g, /3-..- /s/ Wir
Scanning Preparation If x 30 = 0.0 + a.. = TOTAL PAGES 1 a a.
(Count does not include cover sheet) :9
Ma
BY: ria �Date:a � /s/
Production Scanning
Stage 1 Page Count from Scanned File: !el,"3 (Count does include cover eet)
Page Count Matches Number in Scanning Pre aration: YES NO
BY: 411" Date: 3/9.5 13 /s/ lAif--)
Stage 1 If NO in stage 1, page(s) discrepancies were found: YES NO
BY: Maria Date: /s/
Stage 2 Additional Well Reports: 11)
NO TOTAL PAGES:51
Digital version appended by: Meredith Michal` Date: 3l�p I
/s/
Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: 1 7 Li--
Scanning is complete at this point unless rescanning is required.
ReScanned
BY: Maria Date: /s/
Comments about this file: Quality Checked
7/8/2014 Well History File Cover Page_20140708.doc
213130
25536
ConocoPhillips RECEIVE;:
MAR 19 2015
TRANSMITTAL AOGCC DATA LOGGED
CONFIDENTIAL DATAM3K.BENDER
R
FROM: Sandra D. Lemke, ATO3-0340 TO: Makana Bender
ConocoPhillips Alaska, Inc. AOGCC
P.O. Box 100360 333 W. 7th Ave., Suite 100
Anchorage AK 99510-0360 Anchorage, Alaska 99501
RE: CD4-290
DATE: 03/18/2015
Transmitted:
Colville River Unit, Alaska
CD4-290
1 CD and hardcopy report
Halliburton -Surface data logging and End of Well report- mud logging data for CD4-290; 01/17/2014; general
information, daily summary, days vs. depth, after action review, mud record, bit record, morning reports, survey reports;
color log presentations, one set each for wellbore
1 each - color log prints:
Formation Evaluation 2" MD
Gas ratio 2" MD
Drilling Engineering 2" MD
Please promptly sign, scan and return electronically to Sandra.D.LemkeCaCOP.com
CC: CD4-290 transmittal folder, production well files, eSearch
Receipt: )12.,444z4z49...:1 _,e4ettatt.
' 1 �` a�= GIS-Technical Data Management I ConocoPhillips I Anchorage, Alaska I Ph: 907.265.6947
OVERSIZED DOCUMENT
INSERT
This file contains one or more
oversized documents. These
materials may be found in the
original hard file or check the parent
folder to view it in digital format.
Well History File
APPENDIX
Information of detailed nature that is not
particularly germane to the Well Permitting Process
but is part of the history file.
To improve the readability of the Well History file and to
simplify finding information, information of this
nature is accumulated at the end of the file under APPENDIX.
No special effort has been made to chronologically
organize this category of information.
Technical Report Title
Date
Client: ConocoPhillips Alaska, Inc
Field: Alpine
Rig: Doyon 19
Date: January 17, 2014
Surface Data Logging
End of Well Report
CD4-290
TABLE OF CONTENTS
1. General Information
2. Daily Summary
3. Days vs. Depth
4. After Action Review
5. Mud Record
6. Bit Record
7. Morning Reports
8. Survey Report
Digital Data to include:
Final Log Files
Final End of Well Report
Final LAS Exports
Halliburton Log Viewer
EMF Log Viewer
GENERAL WELL INFORMATION
Company: ConocoPhilips Alaska, Inc
Rig: Doyon 19
Well: CD4-290
Field: Alpine
Borough: North Slope Borough
State: Alaska
Country: United States
API Number: 50-103-20674-00-00
Sperry Job Number: AK-AM-900966759
Job Start Date: 17 December 2013
Spud Date: 17 December 2013
Total Depth: 12956’ MD, 6235’ TVD
North Reference: True
Declination: 19.25°
Dip Angle: 80.79°
Total Field Strength: 57560 nT
Date Of Magnetic Data: 08 October 2013
Wellhead Coordinates N: North 70° 17’ 32.262”
Wellhead Coordinates W: West 150° 59’ 16.393“
Drill Floor Elevation 55.2’
Ground Elevation: 18.9’
Permanent Datum: Mean Sea Level
SDL Engineers: Craig Amos, David Mckechnie, Andrew
Bongard, Jeremy Tiegs
SDL Sample Catchers: Chris Woolley, Hilary Garney, Michael
LaDouceur
Company Representatives: Ken Harding, Josh Riley, Adam Dorr, Robert
Wall, Don Mickey, Dan Lowe
SSDS Unit Number: 109
DAILY SUMMARY
12/17/2013
Pick-up 5" HWDP and 7" flex collar. Slip/Cut drill line. Service the top drive and drawworks.
Calibrate block height. Hold pre-job safety meeting on picking up BHA. Pick-up BHA as
directed. Fill the hole, and pressure test lines to 4000 psi. Fish out junk from hole (plastic and
wood). Drill from 114' MD to 145' MD. Take gyro surveys and troubleshoot MWD.
Gas: No significant gas data.
Fluids: No losses.
12/18/2013
Drill ahead from 145' MD to 1,205' MD.
Gas: The maximum formation gas was 37 units, and the average drilling background gas was 9
units.
Fluids: No losses.
12/19/2013
Drill ahead from 1,205' MD to 2520' MD. Survey and circulate 2 bottoms-up. Flow check well-
Static. Backream out of the hole from 2,520' MD to 2,072' MD.
Gas: The maximum formation gas was 209 units, and the average drilling background gas was
36 units.
Fluids: No losses.
12/20/2013
Backream out of the hole from 2,072' MD to 450' MD. Blow-down the top drive. Flow check
well- Static. Run in hole from 474' MD to 483' MD. Ream down through forest. Run in hole to
2,447' MD. Wash and ream down to 2,520' MD. Weight up the mud to 10 ppg. Observe well-
Static. Pull out of hole on the trip tank to 1,036' MD. Pump out spotting pill to 566' MD. Pull out
of hole on the trip tank to 204' MD. Lay down BHA as directed. Clean rig floor, and remove
elevators and bails. Rig-up Tesco CDS.
Gas: The maximum formation gas was 78 units, and the average drilling background gas was 7
units. The maximum trip gas observed was 53 units.
Fluids: No losses.
12/21/2013
Hold pre-job safety meeting in preparation for running casing. Run in hole with 10.75" casing to
1,625' MD. Circulate bottoms-up and condition mud. Run in hole to 2,470' MD. Make-up
hanger and landing joint. Land casing at 2509' MD. Circulate and condition pipe volume. Rig
down Tesco, and then rig-up cement head. Circulate and condition for surface cement job.
Hold pre-job safety meeting on surface cement job. Perform cement job as per detail. Floats
not holding- Hold 500 psi on casing. Prepare to rig down cement head and riser. Rig down
cement equipment.
Gas: The maximum formation gas was 27 units, and the average drilling background gas was 6
units. The maximum trip gas observed was 23 units.
Fluids: No losses.
12/22/2013
Rig-down cement head, and pull landing joint. Clear rig floor. Make-up stack washer and flush
riser. Nipple down surface riser, remove from cellar. Rig-up Quad jetting tool. Perform top job.
Hold a pre-job safety meeting in preparation for nipple up. Set test plug. Hold a pre-job safety
meeting in preparation for BOP testing. Troubleshoot looking for leaks on BOP equipment. Pull
lower test plug and set upper test plug. Rig-up and test plug.
Gas: No significant gas data.
Fluids: No losses.
12/23/2013
Continue to test the BOP. Pick up MWD tools. Make up Dutch Riser and perform dummy run.
Re-test lower rams. Install wear ring. Make up BHA. Shallow test MWD tools at 1,495' MD.
Service the rig. Continue running in the hole. Tag cement at 2,353' MD. Test casing for 30
minutes. Blow down lines in preparation to drill out cement at report time.
Gas: No significant gas data.
Fluids: No losses.
12/24/2013
Drill out cement and float shoe. Drill out 20' of new hole. Circulated and conditioned mud.
Performed leak off test. Displace the well to 9.6 ppg LSND. Monitor the well- Static. Pull out of
the hole and lay down BHA. Make up new BHA and run in the hole with same. Shallow test
MWD and begin drilling ahead from 2,540' MD
Gas: The maximum formation gas was 728 units, and the average drilling background gas was
116 units.
Fluids: No losses.
12/25/2013
Drill ahead to 4413' MD. Circulate 2 bottoms up. Flow checked- Static. Pull out of the hole on
the trip tank to 744' MD. Flow checked- Static. Continue pulling out of the hole to 187' MD. We
are laying down BHA at report time.
Gas: The maximum formation gas was 747 units, and the average drilling background gas was
114 units.
Fluids: No losses.
12/26/2013
Lay down BHA #3. Make up BHA #4 and begin running in the hole with same to 1,465' MD.
Perform shallow test on MWD tools. Continue running in the hole to 2,624' MD. Circulate 2
bottoms up and encountered 902 units of trip gas and cuttings unloading at the shakers. Run in
the hole to 4,319' MD. We are drilling ahead at 5,403' MD at report time.
Gas: The maximum formation gas was 902 units, and the average drilling background gas was
120 units.
Fluids: No losses.
12/27/2013
Continue drilling ahead to 6,064' MD. Pump weighted sweep and circulated 2 bottoms up. Flow
checked- Static. Decision was made to pull out of the hole to remove stabilizers hindering
directional build. Trip out of the hole to 2,624' MD. Circulate two bottoms up (Noted 304 units of
gas).
Gas: The maximum formation gas was 304 units, and the average drilling background gas was
56 units.
Fluids: No losses.
12/28/2013
Pull out of the hole to 834' MD. Test the annular. Test top and bottom rams. Pull out of the hole
and alter BHA as per Schlumberger. Run in the hole to 2,615' MD. Test MWD tools and
circulate bottoms up (Noted 462 units of gas). Continue running in the hole to 6006' MD.
Circulate bottoms up (Noted max gas of 845 units). Drill ahead to 6290' MD. Decision was made
to pull out of the hole due to difficulty to slide. We are currently circulating bottoms up in
preparation for trip at report time.
Gas: The maximum formation gas was 845 units, and the average drilling background gas was
85 units.
Fluids: No losses.
12/29/2013
Complete circulating/conditioning in preparation for tripping out of the hole. Pull out of the hole
on trip tank to 2,500' MD. Flow checked- Slight drop in volume. Continue tripping out to surface.
Lay down BHA. Slip and cut drill line. Calibrate gas equipment. Made up BHA #6 and began
tripping into the hole. Fill BHA and HWDP at 875' MD (Noted 81 units of gas).
Gas: The maximum circulating gas was 81 units, and the average circulating gas was 7 units.
Fluids: There were 22 barrels of water-based mud lost down hole.
12/30/2013
Continue running in the hole to 2,609' MD. Test MWD and circulate bottoms up (Noted 915 units
of gas). Run in the hole to 6,393' MD. Wash down the last stand. Drill ahead to 6,393' MD. Stop
to trouble shoot MWD tool. Drill ahead to 6,403' MD. Circulate one bottoms up and condition the
mud in preparation for the trip. Flow checked the well- Slight drop. Pull out of the hole on the trip
tank to 2,514' MD. Flow checked the well- Observed slight drop. Pull out of the hole to surface
and lay down tools. We are currently preparing BHA #7 at report time.
Gas: The maximum circulating gas was 915 units, and the average circulating gas was 38
units. The maximum trip gas observed was 915 units.
Fluids: There were 18 barrels of water-based mud lost down hole.
12/31/2013
Trouble shoot and service top drive while BHA #7 was being repaired in the pipe shed. Change-
out inverter. Make up BHA and run in the hole to 1,668' MD. Shallow test MWD tool. Run in the
hole to 2,610. Circulate bottoms up (Noted max gas of 1,641 units). Rack back two stands and
calibrated weight indicator. We are currently running in the hole to 5,907' MD at report time.
Gas: The maximum circulating gas was 1641 units, and the average circulating gas was 24
units. The maximum trip gas observed was 1641 units.
Fluids: There were 11 barrels of water-based mud lost down hole.
1/01/2014
Continue running in the hole to 6,285' MD, washing down the last stand. Circulate bottoms up
(Noted 290 units of trip gas). Resume drilling intermediate hole to 6,959' MD. Add 275 bbls of
spike fluid at 7,080' MD. Circulate out 6,000 units of gas at 7,507' MD. Increase mud weight to
10.2 ppg. Encounter max gas of 9,226 units at 7,600' MD. Circulated out peak gas to a
background of 330 units and resumed drilling to intermediate TD at 7,672' MD. Pumped sweep
upon reaching TD. Pull out of the hole on elevators to 7,105' MD. Back ream out to 6,379' MD.
Circulate bottoms up noting 150 units of gas. Trip in the hole to 7,600' MD. Circulate bottoms up
while reciprocating pipe at 120-150 RPM (Noted 680 units of gas at bottoms up).
Gas: The maximum formation gas was 9226 units, and the average drilling background gas was
548 units. The maximum trip gas observed was 290 units.
Fluids: There were 36 barrels of water-based mud lost down hole.
1/02/2014
Circulate two bottoms up at 7600' MD after short tripping to 6400' MD (Noted 680 units of gas
upon first bottoms up). Pump 95 bbl wellbore strengthening pill on bottom. Run MAD pass from
6,379' MD to 6,191' MD. Monitor well – Static. Pull out of the hole on trip tank to 4,682' MD.
Run MAD pass to 4,399' MD. Pull out of the hole on trip tank to 2,985' MD. Backream out of the
hole to 2,515' MD. Pump sweep and circulate casing clean. Resume tripping out to 730'' MD.
Lay down BHA. Changing out upper pipe rams at report time.
Gas: The maximum circulating gas was 680 units, and the average circulating gas was 25 units.
The maximum trip gas observed was 680 units.
Fluids: There were 8 barrels of water-based mud lost down hole.
1/03/2014
Finish changing out upper RAMS and test same. Perform 7-5/8" dummy run. Hold PJSM for
running casing. Rig-up Testco and casing equipment. Run intermediate casing to 2,495.
Circulate bottoms up at the shoe (Noted 443 units of max gas). Continue running to 5,510' MD.
Circulate bottoms up with an average gas of 200 units. Run in the hole to 7,623' MD. Make up
hanger and landing joint. Land the hanger on the second attempt. Stage up pumps to circulate.
Circulate and condition at 60 SPM while reciprocating pipe at report time. Add water at 15-25
bbls/hr, diluting mud weight to 10.3 ppg.
Gas: The maximum circulating gas was 680 units, and the average circulating gas was 96 units.
The maximum trip gas observed was 680 units.
Fluids: There were 7 barrels of water-based mud lost down hole.
1/04/2014
Stage up pumps to 6 bbls/minute. Land the casing. Rig down Tesco and rigged up cement
head. Circulate and condition. Pump cement job. Displace with rig pumps- Plug did not bump.
Wait on cement and open stage collar. Pump 15.8 ppg cement and displaced with rig pumps.
Bump the plug. Rigged down cement head and set pack off- Test same. We are currently laying
down 5" drill pipe at report time.
Gas: The maximum circulating gas was 476 units, and the average circulating gas was 23 units.
Fluids: There were 7 barrels of water-based mud lost down hole.
1/05/2014
Continue to lay down 5" drill pipe. Pick up and racked back 4" drill pipe. We are currently testing
BOP at report time.
Gas: No significant gas data.
Fluids: No losses.
1/06/2014
Finish testing BOP. Make up BHA and run in the hole on 4" drill pipe singles to1,549' MD.
Perform shallow test for MWD tools. Continue to run in the hole to 1,836' MD. Shallow tested
MWD again. Continue in the hole on singles to 4,888' MD. Rig up and test casing to 1000 psi.
Wash down to 4,995' MD. Drill out stage collar. Wash and ream to 5,174' MD. Circulate bottoms
up and test casing to 3,500 psi for 30 minutes. We are currently running in the hole on singles to
5,174' MD at report time.
Gas: The maximum circulating gas was 11 units, and the average circulating gas was 4 units.
Fluids: No losses.
1/07/2014
Continue to run in the hole to 7150'. Wash and ream to the top of cement at 7460'. Drill out
cement to 7530'. Drill to 7652' and circulate two bottoms up. Perform a flow check on the well-
Static. Trip out of hole to lay down the BHA. Make up BHA #9. Trip in the hole to 1519'. Shallow
tested MWD- Failure. Pull out of the hole to lay down BHA at report time.
Gas: The maximum circulating gas was 8 units, and the average circulating gas was 1 units.
Fluids: No losses.
1/08/2014
Make up BHA #10. Run in the hole to 566' MD. Perform shallow test for MWD tools- Success.
Continue in the hole to 7,621' MD. Slip and cut drill line. Wash down the last stand and drill out
cement and 20' of formation (Noted 648 units of gas). Displace well to 9.4 ppg OBM. Perform
FIT to 12.5 ppg. Drill ahead to 7802' MD, with background gas of 1,670 units at report time.
Gas: The maximum formation gas was 1759 units, and the average drilling background gas was
145 units.
Fluids: There were 22 barrels of mineral oil-based mud lost down hole.
Geology: The samples have consisted of primarily white to light gray, very fine to fine-grained
sandstone, with a small percentage of siltstone and scattered pyrite.
1/09/2014
Drill ahead from 8002' MD Backream and flow check the well at every connection. The average
background gas was 1009 units, and the 24 hour gas average was 719 units. The lithology
consists of 90+% fine-grained sandstone and 10% siltstone with occasional traces of coal. Drill
ahead to 9430' MD at report time.
Gas: The maximum formation gas was 1839 units, and the average drilling background gas was
719 units.
Fluids: There were 95 barrels of mineral oil-based mud lost down hole.
Geology: The samples have consisted primarily of white to light gray, translucent, very fine -
grained sandstone, with a small percentage of siltstone, trace coal, and scattered pyrite.
1/10/2014
Drill ahead from 9,430' MD with an average background gas of 879 units. Backream and flow
check the well at every connection. Perform dilutions at 9,700' and 10,700' MD. Drill ahead to
10,844' MD at report time. Lithology consists of 100% fine-grained sandstone.
Gas: The maximum formation gas was 1679 units, and the average drilling background gas was
586 units.
Fluids: There were 39 barrels of mineral oil-based mud lost down hole.
Geology: The samples have consisted primarily of white to light gray, translucent, very fine -
grained sandstone, with a small percentage of siltstone.
1/11/2014
Drill ahead from 10844' MD with an average background gas of 885 units. Backream and flow
check the well at every connection. Drill ahead to 12169' MD at report time. Lithology consists
of 85% fine-grained sandstone and 15% siltstone.
Gas: The maximum formation gas was 2040 units, and the average drilling background gas was
596 units.
Fluids: There were 101 barrels of mineral oil-based mud lost down hole.
Geology: The samples have consisted primarily of white to light gray, translucent, amber,
orange, very fine to fine -grained sandstone, with a small percentage of siltstone.
1/12/2014
Drill ahead from 12169' MD to 12765, and then backream to 12481' MD. Wash down to bottom
and resume drilling ahead to 12954' MD. Circulate 4 bottoms up. Monitor well- Static. Begin
backreaming out of the hole. We are currently backreaming out of the hole to 12104' MD at
report time.
Gas: The maximum formation gas was 1090 units, and the average drilling background gas was
192 units.
Fluids: There were 96 barrels of mineral oil-based mud lost down hole.
Geology: The samples have consisted primarily of white to light gray, translucent, amber, very
fine to fine -grained sandstone, with small amounts of grey to dark gray, brown siltstone.
1/13/2014
Sample catchers released. Continue backreaming out of the hole to 7,717' MD. Encounter
occasional tight spots. Circulate bottoms up at the casing shoe (Noted average gas of 14 units
while circulating at shoe). Flow check the well- Noted slight drop. Resume pumping out of the
hole to 5,714. Flow checked well. Pull out of the hole on trip tank to 5,657' MD. Circulate
bottoms up and resume backreaming out of the hole to 5,142' MD at report time.
Gas: The maximum circulating gas was 59 units, and the average circulating gas was 14 units.
Fluids: There were 81 barrels of mineral oil-based mud lost down hole.
1/14/2014
Backream out of the hole to 380' MD. Circulate 5 bottoms up. Lay down the BHA. Monitor the
well- Observed slight drop. Rig up 3.5" tubing equipment. Run in the hole to 5266' MD. Circulate
bottoms up. Run 2.875" tubing at report time.
Gas: The maximum circulating gas was 43 units, and the average circulating gas was 5 units.
Fluids: No Losses.
1/15/2014
Run in the hole with 3.5' tubing on 4" drill pipe to 12664' MD. Monitor the well- Static. Set the
liner and pull out of the hole to 7,481' MD. Displace the well to 9.4 ppg brine. Flow check- Static.
Pull out of the hole on the trip tank to 5,860' MD at report time.
Gas: The maximum circulating gas was 27 units, and the average circulating gas was 3 units.
Fluids: No Losses.
1/16/2014
Pull out of the hole on the trip tank to surface, while flow checking periodically- Static. Lay down
liner hanger running tool. Rig up to run 2-7/8" tubing. Run in the hole to 5,528' MD at report
time.
Gas: No significant gas data.
Fluids: No Losses.
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
15000
0 5 10 15 20 25 30 35
Me
a
s
u
r
e
d
D
e
p
t
h
Rig Days
Prognosed
Actual
WELL NAME: CD-290
OPERATOR: ConocoPhillips Alaska, Inc
MUD CO: MI Swaco
RIG: Doyon 19
SPERRY JOB: AK-XX-900966759
Days vs. Depth
17 December 2013
Sperry SDL Services Online
LOCATION: Alpine
AREA: North Slope Borough
STATE: Alaska
SPUD: 17-Dec-2013
TD: 12-Jan-2014
Commenced 13.5" Surface Hole Section
On Bot: 21:49 17 Dec 2013
TD Surface Hole Section
2520' MD, 2387' TVD
Off Bot: 21:00 19 Dec 2013
Commenced 9.875" Intermediate Hole Section
On Bot: 03:13 24 Dec 2013
TD Intermediate Hole Section
7672' MD, 6209' TVD
Off Bot: 17:23 01 Jan 2014
POOH to Change BHA
Off Bot: 03:39 24 Dec 2013
On Bot: 15:52 24 Dec 2013
POOH for MWD Failure
Off Bot: 13:34 25 Dec 2013
On Bot: 08:53 26 Dec 2013
POOH to remove stabilizers
Off Bot: 16:46 27 Dec 2013
On Bot: 16:33 28 Dec 2013
Pull out of hole due to
difficulty sliding
Off Bot: 00:24 29 Dec 2013
On Bot: 06:33 30 Dec 2013
Pull out of hole for MWD
Off Bot: 09:08 30 Dec 2013
On Bot: 01:21 01 Jan 2014
Commenced 6.750" Production
Hole Section
On Bot: 14:15 08 Jan 2014
TD Production Hole Section
12956' MD, 6235' TVD
Off Bot: 15:53 12 Jan 2014
Test BOPs
5 Jan 2014
Landed 7-5/8" Casing
7672' MD, 6209' TVD
02 Jan 2013
WELL NAME:LOCATION:Alpine
OPERATOR:AREA:North Slope Borough
SPERRY JOB:STATE:Alaska
RIG:Doyon 19 HOLE SECTION Surface
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
What went as, or better than, planned:
The screws that fasten the wire to the datascan from the 8800 came loose, or were never tightened,
and lead to erratic total gas data for a couple of minutes (not while drilling).
Recommendations:
Innovations and/or cost savings:
INSITE 8, on the new Windows 7 computers, operated without error.
Difficulties experienced:
Ensure all lines/wires/cables are securely fastened.
N/A
ConocoPhillips Alaska, Inc.
AK-XX-0900966759
Andrew Bongard 20-Dec-2013
CD4-290
Surface Data Logging
After Action Review
WELL NAME:LOCATION:Alpine
OPERATOR:AREA:North Slope Borough
SPERRY JOB:STATE:Alaska
RIG:Doyon 19 HOLE SECTION Intermediate
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ConocoPhillips Alaska, Inc.
AK-XX-0900966759
Tyler Dretke 1-Jan-2014
CD4-290
What went as, or better than, planned:
Had numerous problems regarding the pump stroke counter data received from WITS. The counter
would malfunction, creating an extremely high false reading. This false reading caused our lag depth to
instantly jump ahead, creating large gaps in our gas data.
Recommendations:
Innovations and/or cost savings:
N/A
Difficulties experienced:
Installing our own pump stroke counters so that we're not dependant on the rigs. Proximety sensors
would greatly increase reliability while reducing the risk of injury for both personel and property.
N/A
Surface Data Logging
After Action Review
WELL NAME:LOCATION:Alpine
OPERATOR:AREA:North Slope Borough
SPERRY JOB:STATE:Alaska
RIG:Doyon 19 HOLE SECTION Production
EMPLOYEE NAME:DATE:
Sperry Drilling Confidential Document v 3.0
ConocoPhillips Alaska, Inc.
AK-XX-0900966759
David McKechnie 13-Jan-2014
CD4-290
What went as, or better than, planned:
There have been instances where IRIS has lost communication with MADI while drilling. In most cases,
this is a result of a network card power management setting.
Recommendations:
Innovations and/or cost savings:
The gas trap operated flawlessly throught the production zone, requiring very little maintenance.
Difficulties experienced:
Before beginning a well, ensure all power management settings are disabled on all computers.
N/A
Surface Data Logging
After Action Review
CD4-290
ConocoPhillips Alaska, Inc.
MI Swaco
Doyon 19
AK-XX-0900966759
Date Depth Wt Vis PV YP Gels Filt
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water Sd Pm pH MBT Pf/Mf Chlor Hard
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%%ppb Eqv mg/l Ca++
17-Dec 145 8.70 392 22 78 54/69/76 13.0 122/100/90/76/52/52 2/-2.0 0/98 -0.06 9.6 30.0 0.01/0.02 150 60 Drilling Surface Hole
18-Dec 1205 8.80 341 24 48 38/57/61 9.4 96/72/65/54/34/34 2/-2.0 0/98 -0.04 9.4 30.0 0.01/0.02 300 60 Drilling Surface Hole
19-Dec 2520 9.80 345 30 60 48/64/67 8.6 120/90/80/68/44/43 2/-8.0 1/91 0.10 0.04 9.3 28.8 0.01/0.02 200 60 BROOH
20-Dec 2520 10.00 364 40 71 44/67/70 8.9 151/111/87/67/43/43 2/-9.0 1/91 0.10 0.04 9.3 30.0 0.01/0.02 200 60 R/U to Run Casing
21-Dec 2520 9.80 62 18 18 6/8/14 11.2 54/36/28/19/7/6 2/-7.5 0/93 0.10 0.04 9.1 25.0 0.01/0.02 200 60 Rig Down Cement Equipment
22-Dec 2520 9.70 57 20 13 5/8/12 11.2 53/33/27/17/6/5 2/-7.5 0/93 0.10 0.06 8.7 25.0 0.02/0.04 200 80 BOP Testing
23-Dec 2520 9.70 64 20 16 6/13/19 13.3 56/36/29/18/7/6 2/-8.0 0/92 0.10 0.16 10.4 25.0 0.08/0.60 200 120 Prepare for LOT
24-Dec 2998 9.60 40 7 23 12/14/15 -37/30/27/23/11/10 1/-5.5 1/94 -0.05 9.8 2.5 0.04/0.15 350 40 Drilling ahead
25-Dec 4413 9.70 40 9 21 10/17/21 5.2 39/30/27/22/10/9 1/-7.0 2/91 -0.08 10.2 16.3 .07/.15 400 40 Laying Down BHA
26-Dec 5403 9.80 42 9 26 12/18/22 -44/35/31/26/12/11 1/-8.0 2/90 -0.07 9.6 18.0 .05/.15 400 60 Drilling Ahead
27-Dec 6064 9.80 41 9 28 12/17/22 -46/37/33/27/12/11 1/-8.0 3/89 -0.05 9.4 16.3 .04/.15 400 60 POOH
28-Dec 6290 9.90 39 9 22 10/14/18 3.3 40/31/28/23/11/10 1/-8.5 3/90 -0.06 9.3 20.0 .03/.12 400 40 Drilling ahead
29-Dec 6290 9.90 45 8 24 10/12/15 3.1 40/32/28/23/10/9 1/-8.0 3/89 -0.06 9.0 14.0 .03/.12 400 40 Derrick Inspection
30-Dec 6404 9.90 45 9 25 12/15/18 3.0 43/34/30/24/12/11 1/-8.5 3/89 -0.06 10.0 15.0 .03/.12 400 40 RIH
31-Dec 6404 9.90 42 9 23 11/13/14 3.0 41/32/29/24/11/10 1/-8.5 3/89 -0.04 9.0 16.3 .03/.11 400 40 RIH
1-Jan 7672 10.20 41 10 25 12/14/17 3.3 45/35/32/25/11/10 1/2 11.5 3/86 tr 0.04 9.2 16.3 .03/.1 400 40 BROOH
2-Jan 7672 10.30 41 10 26 11/13/17 3.0 46/36/32/26/11/10 1/-12.0 2/86 tr 0.04 9.0 16.3 .03/.40 400 40 Change out Pipe RAMS
3-Jan 7672 10.30 44 10 25 10/12/15 3.0 45/35/30/25/11/10 1/2 12.5 2/85 tr 0.05 9.0 17.5 .04/.30 400 40 Staging up pumps
4-Jan 7672 10.20 39 9 19 7/10/12 2.8 37/28/25/20/7/6 1/2 12.0 2/86 tr 0.05 9.0 17.5 .03/.30 400 40 Lay down Drill Pipe
5-Jan 7672 10.20 39 8 18 6/9/11 2.8 34/26/22/18/6/5 1/-12.0 2/86 tr 0.05 9.0 17.5 .03/.30 450 40 Testing BOP
6-Jan 7672 10.00 44 9 18 6/7/14 3.1 34/26/21/15/16 1/-12.0 2/86 tr 0.05 9.2 16.3 0.3/.27 450 60 Picking up Drill Pipe
7-Jan 7662 10.00 48 10 16 7/13/16 5.7 36/26/22/16/6/6 1/-10.0 2/88 tr 0.06 10.8 17.5 .05/.31 450 120 Laying Down BHA
Date Depth Wt Vis PV YP Gels HTHP
R600/R300/R200/R100/
R6/R3 Cake Solids Oil/Water
Alka
POM
Excess
Lime Elec Stab CaCl2 WPS LGS/HGS ASG Remarks
ft - MD ppg sec lb/100 lb/100ft2 m/30m Rheometer 32nds %%ml ppb volts ppb ppm ppb ASG
8-Jan 8002 9.4 59 17 10 12/16/18 5.4 44/27/21/15/8/7 1/2 -77/23 ---36500 ---Drilling 6-3/4" Production Zone
9-Jan 9430 9.4 53 16 13 13/17/18 5.4 45/29/23/16/7/7 1/2 11.87 78/22 1.65 2.15 655 35000 22.38 0.35/11.6 2.8 Drilling Ahead
10-Jan 10833 9.4 48 15 13 12/17/19 5.8 43/28/23/16/8/7 1/2 11.89 79/21 1.55 2.02 755 34500 23.07 4.5/110.48 2.8 Drilling Ahead
11-Jan 12008 9.4 46 14 11 12/16/17 4.1 39/25/20/15/7/7 1/2 12.37 77/23 1.6 2.08 790 35000 21.93 7.22/11.2 2.7 Drilling Ahead
12-Jan 12954 9.4 46 13 13 11/16/17 5.8 39/26/20/15/7/6 1/2 11.75 77/23 1.3 1.69 676 38500 23.15 4.45/107.9 2.8 TD 6-3/4" Production Zone
13-Jan 12954 9.4 52 15 11 11/15/16 5.8 41/26/20/15/7/6 1/2 11.86 77/23 1.05 1.37 847 35500 21.74 3.28/109.9 2.8 Backreaming out of Hole
Casing Record
WELL NAME:LOCATION:Alpine
OPERATOR:AREA:North Slope Borough
MUD CO:STATE:Alaska
RIG:SPUD:17-Dec-2013
SPERRY JOB:TD:12-Jan-2014
Remarks
20" Conductor @ 114' MD, 114'TVD
10.75" Casing @ 2509' MD, 2207'TVD
7.625" Casing @ 7672' MD, 6209'TVD
3.5" Casing @ 12956' MD, 6234'TVD
W
a
t
e
r
a
n
d
O
i
l
B
a
s
e
d
M
u
d
R
e
c
o
r
d
BHA#SDL
RUN #Bit #Bit Type Bit Size Depth In Depth
Out Footage Bit
Hours TFA AVG
ROP
WOB
(max)
RPM
(max)
SPP
(max)
FLOW GPM
(max)Bit Grade Comments
1 100 1 MXL-1X 13.50 114 2520 2406 28.50 0.739 84.4 46.8 80 2581 755 1-2-WT-A-E-1-RG-TD Surface Hole Section
2 200 2 FX56S 9.875 2520 2541 21 0.20 0.863 90.9 5 40 1240 700 2-3-BT-G-X-1/8-CT-DTF Intermediate Rathole
3 300 3 FX56S 9.875 2541 4413 1872 11.90 0.863 157.2 8 100 2250 750 1-1-NO-A-X-1-NN-DTF POOH for MWD
4 400 3rr FX56S 9.875 4413 6064 1651 15.50 0.863 106.8 15 80 2500 750 0- 1-CT-G-X-I-NN-BHA POOH to lay down stabilizers
5 500 3rr FX56S 9.875 6064 6290 226 3.50 0.863 63.6 10 80 2600 750 0- 1-CT-G-X-I-NN-BHA POOH
6 600 4 MSi 516 9.875 6289 6404 115 0.70 0.863 169.1 18 170 2370 750 0-1-CT-S-X-I-NO-DTF POOH for MWD tools
7 700 4 rr1 MSi 516 9.875 6404 7672 1268 8.50 0.863 149.9 22 170 2600 750 0-1-CT-G-X-I-NO-TD TD 9-7/8 Intermediate
8 800 5 MDSi 513 6.75 7672 7672 0 0.00 0.383 0.0 0 120 0 250 0-1-FC-G-X-I-PN-DTF POOH For Shallow Test Failure
9 900 5rr1 MDSi 513 6.75 7672 7672 0 0.00 0.383 0.0 0 120 0 250 0-1-FC-G-X-I-PN-DTF POOH For Shallow Test Failure
10 1000 5rr2 MDSi 513 6.75 7672 12956 5284 57.20 0.383 92.4 10 120 3000 250 2-1-CT-G-X-I-NO-TD TD 6-3/4" Production Lateral
WELL NAME:CD4-290 LOCATION:Alpine
OPERATOR:ConocoPhillips Alaska, Inc.AREA:North Slope Borough
MUD CO:
SPERRY JOB:AK-XX-0900966759 TD:12-Jan-2014
MI Swaco STATE:Alaska
RIG:Doyon 19 SPUD:17-Dec-2013
B
i
t
R
e
c
o
r
d
.
.
*
24 hr Recap:
CommentsWeight
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Pick-up 5" HWDP and 7" flex collar. Slip/Cut drill line. Service top drive and drawworks. Calibrate block height.
Chlorides
mg/l
150.00
API FLYP
17-Dec-2013
23:59
Current Pump & Flow Data:
0
Max
N/A
ECD
(ppg)
ROP (ft/hr)
4.19 @
Avg Min
Morning Report Report # 1
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to114'
0.0
Depth
Alpine
95%
Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
2.0
13.5
8.70
Mill Tooth
8.70
Size
22
out junk from hole (plastic and wood). Drill from 114' MD to 145' MD. Take gyro surveys and troubleshoot MWD.
ConditionBit #
1
0
0
N/A 100% Gas In Air=10,000 Units
0 00
RPM
ml/30min
9.6013.0
0Background (max)
Trip
(max)(current)
Connection
Average
N/A
Lst
Type
C-3
Cht Silt
78
Depth in / out WOBFootage
114'
Chromatograph (ppm)
0
C-5i
0 00
C-4n
TuffCoal
900966759
N/A
N/A
Drilling 13.5" Section
PV
K. Harding/R. Wall
117'
GvlShClyst Cement
(lb/100ft2)
Conductor Line 94.0 H-40
0
0 0
Grade
C-5nC-1Units*
Yesterday's Depth:
Current Depth:
24 Hour Progress:
104.7 Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
114'
145'
31'
Max @ ft Current
115'52.6
Date:
Hold pre-job safety meeting on picking up BHA. Pick-up BHA as directed. Fill the hole, and pressure test lines to 4000 psi. Fish
0
C-4i
N/AMinimum
N/A0
Ss
Gas Summary
cP
Bit Type Hours
30.0392
Mud TypeDepth
(current)
(ppb Eq)
Spud
Mud Data
TFA
in
pH
0.739
0
0
0
Siltst
0
Casing
Summary
Lithology (%)
C-2Depth
0
0
Cly
MBT
0
0
0
0
907-670-4047Unit Phone:
0
Andrew Bongard
Maximum 0
Report By:Logging Engineers:Andrew Bongard/Craig Amos
Size
20.00''114'
Set At
.
.
*
24 hr Recap:
Size
20.00''114'
Set At
907-670-4047Unit Phone:
0
Andrew Bongard
Maximum 4514
Report By:Logging Engineers:Andrew Bongard/Craig Amos
1067
0
0
0
Cly
MBT
Casing
Summary
Lithology (%)
C-2Depth
0.739
0
0
0
Siltst
0
(ppb Eq)
Spud
Mud Data
TFA
in
pH
Bit #Bit Type
Ss
Gas Summary
cP
Hours
30.0341
Mud TypeDepth
(current)
260'Minimum
1192'37
9
C-4i
145'
1205'
1060'
Max @ ft Current
1180'119.2
Date:
Yesterday's Depth:
Current Depth:
24 Hour Progress:
1729.0 Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
C-5nC-1Units*
0
0 0
Grade
(lb/100ft2)
Conductor Line 94.0 H-40
GvlShClyst Cement
900966759
N/A
N/A
Drilling 13.5" Section
PV
K. Harding/R. Wall
942'
C-4n
TuffCoal
Chromatograph (ppm)
0
C-5i
0 00
48
Depth in / out WOBFootage
114'
Lst
Type
C-3
Cht Silt
Average
N/A
(max)
Trip
(max)(current)
Connection13Background
RPM
ml/30min
9.409.4
100% Gas In Air=10,000 Units
0 000
N/A
0
Condition
1
2.0
13.5
8.80
Mill Tooth
8.80
Size
24
Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
1205'
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to114'
0.0
Depth
Alpine
Morning Report Report # 2
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
ROP (ft/hr)
4.19 @
Avg Min
649
155
YP
18-Dec-2013
23:59
Current Pump & Flow Data:
1721
Max
N/A
ECD
(ppg)
95%
Chlorides
mg/l
300.00
API FL
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Drill ahead from 145' MD to 1,205' MD.
CommentsWeight
.
.
*
24 hr Recap:
CommentsWeight
API FL
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Drill ahead from 1,205' MD to 2520' MD. Survey and circulate 2 bottoms-up. Flow check well- Static. Backream-out-
mg/l
200.00
YP
19-Dec-2013
23:59
Current Pump & Flow Data:
1589
Max
N/A
ECD
(ppg)
95%
Chlorides
ROP (ft/hr)
4.19 @
Avg Min
599
143
Morning Report Report # 3
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to114'
0.0
Depth
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
2520'
8.0
13.5
9.80
Mill Tooth
9.80
Size
29.07 2520'
30
Condition
1
427
0
N/A 100% Gas In Air=10,000 Units
0 00
RPM
ml/30min
9.308.6
39Background (max)
Trip
(max)(current)
Connection
Average
N/A
Type
C-3
Cht Silt
Footage
114'
0
C-5i
0 00
C-4n
TuffCoal
900966759
N/A
N/A
BROOH
PV
K. Harding/R. Wall
46.8
2496'
GvlShClyst CementLst
2406'
(lb/100ft2)
Conductor Line 94.0 H-40
0
0 0
Grade
Chromatograph (ppm)
C-5nC-1Units*
Yesterday's Depth:
Current Depth:
24 Hour Progress:
573.7 Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
1205'
2520'
1315'
Max @ ft Current
1489'136.4
Date:
of-hole from 2,520' MD to 2,072' MD.
36
C-4i
2471'Minimum
2505'209
Ss
Gas Summary
cP
Hours
28.8345
Mud TypeDepth
(current)
80.0
Spud
Mud Data
TFA
in
pH
Bit #Bit Type
60
Depth in / out WOB
0.739
0
54
0
Siltst
1106
Casing
Summary
Lithology (%)
C-2Depth
Cly
MBT
(ppb Eq)
4152
0
0
0
907-670-4047Unit Phone:
0
Andrew Bongard
Maximum 22583
Report By:Logging Engineers:Andrew Bongard/Craig Amos
Size
20.00''114'
Set At
.
.
*
24 hr Recap:
Size
20.00''114'
Set At
907-670-4047Unit Phone:
0
Andrew Bongard
Maximum 9065
Report By:Logging Engineers:Andrew Bongard/Jeremy Tiegs
1136
0
37
Depth
Cly
MBT
(ppb Eq)
162
Casing
Summary
Lithology (%)
C-2
0
0
0
Siltst
Mud Data
TFA
in
pH
Bit #Bit Type
71
Depth in / out WOB
Ss
Gas Summary
cP
Hours
30.0364
Mud TypeDepth
(current)
80.0
N/AMinimum
N/A78
0
474' MD to 483' MD. Ream down through forest. Run-in-hole to 2,447' MD. Wash and ream down to 2,520' MD. Weight up mud to
7
C-4i
2520'
2520'
0'
Max @ ft Current
N/AN/A
Date:
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
C-5nC-1Units*
0
0 0
Grade
Chromatograph (ppm)
Conductor Line 94.0 H-40
GvlShClyst CementLst
900966759
N/A
N/A
R/U to Run Casing
PV
D. Mickey/R. Wall
46.8
2520'
C-4n
TuffCoal
C-5i
0 00
Footage
114' 2406'0.739
Type
C-3
Cht Silt
Average
53
(max)
Trip
(max)(current)
Connection0Background
N/A
RPM
ml/30min
9.308.9
(lb/100ft2)
10,000 Units
0 000
51
0
N/A
Condition
1
100% Gas In Air=
9.0
13.5
10.00
Mill Tooth
10.00
Size
29.07 2520'
40Spud
Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
2520'
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to114'
N/A
Depth
Alpine
Morning Report Report # 4
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
ROP (ft/hr)
4.19 @
Avg Min
0
0
YP
20-Dec-2013
23:59
Current Pump & Flow Data:
0
Max
N/A
ECD
(ppg)
95%
Chlorides
mg/l
200.00
API FL
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Backream-out-of hole from 2,072' MD to 450' MD. Blow-down top drive. Flow check well- Static. Run-in-hole from
CommentsWeight
tank to 204' MD. Lay down BHA as directed. Clean rig floor, and remove elevators and bails. Rig-up Tesco CDS.
10 ppg. Observe well- Static. Pull-out-of-hole on TT to 1,036' MD. Pump out spotting pill to 566' MD. Pull-out-of-hole on the trip
.
.
*
24 hr Recap:
CommentsWeight
Hold pre-job safety meeting on surface cement job. Perform cement job as per detail. Floats not holding- Hold 500 psi on casing.
Circulate and condition pipe volume. Rig down Tesco and rig-up cement head. Circulate and condition for surface cement job.
API FL
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Hold pre-job safety meeting in preparation for running casing. Run-in-hole with 10.75" casing to 1,625' MD.
mg/l
200.00
YP
21-Dec-2013
23:59
Current Pump & Flow Data:
0
Max
N/A
ECD
(ppg)
95%
Chlorides
ROP (ft/hr)
4.19 @
Avg Min
0
0
Morning Report Report # 5
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to114'
N/A
Depth
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
2520'
7.5
13.5
9.80
Mill Tooth
9.80
Size
29.07 2520'
18Spud
Condition
1
100% Gas In Air=
Prep to rig down cement head and riser. Rig down cement equipment.
0
0
N/A 10,000 Units
0 000
RPM
ml/30min
9.1011.2
(lb/100ft2)
0Background (max)
Trip
(max)(current)
Connection
Average
23
C-3
Cht Silt
2406'0.739
Type
114'
0 00
C-4n
TuffCoal
C-5i
D. Mickey/R. Wall
46.8
2520'
CementLst
900966759
N/A
N/A
R/D Cement Equip.
PV
Casing shoe @ 2,509'Conductor Line 94.0 H-40
GvlShClyst
0
0 0
Grade
Chromatograph (ppm)
C-5nC-1Units*
Yesterday's Depth:
Current Depth:
24 Hour Progress:
N/A Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
2520'
2520'
0'
Max @ ft Current
N/AN/A
Date:
Circulate bottoms-up and condition mud. Run-in-hole to 2,470' MD. Make-up hanger and landing joint. Land casing at 2509' MD.
6
C-4i
N/AMinimum
N/A27
0
Ss
Gas Summary
cP
Hours
25.062
Mud TypeDepth
(current)
80.0
Mud Data
TFA
in
pH
Bit #Bit Type
18
Depth in / out WOBFootage
0
0
0
Siltst
59
Casing
Summary
Lithology (%)
C-2Depth
Cly
MBT
(ppb Eq)
777
0
15
907-670-4047Unit Phone:
0
Andrew Bongard
Maximum 2675
Report By:Logging Engineers:Andrew Bongard/Jeremy Tiegs
Size
20.00''114'
Set At
.
.
*
24 hr Recap:
CommentsWeight
Pull lower test plug and set upper test plug. Rig-up and test plug.
up. Set test plug. Hold a pre-job safety meeting in preparation for BOP testing. Troubleshoot looking for leaks on BOP equipment.
API FL
200.00
YP Chlorides
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Rig-down cement head, and pull landing joint. Clear rig floor. Make-up stack washer and flush riser. Nipple down
mg/l
C-3
Cht
22-Dec-2013
23:59
Current Pump & Flow Data:
0
Max
N/A
ECD
(ppg)
95%
D. Mickey/R. Wall
ROP (ft/hr)
4.19 @
Avg Min
0
0
Morning Report Report # 6
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to114'
N/A
Depth
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
2520'
7.5
13.5
9.70
Mill Tooth
9.70
Size
28.50 2520'
20Spud
Condition
1-2-WT-A-E-1-RG-TD1
100% Gas In Air=
0
0
N/A 10,000 Units
0 000
RPM
ml/30min
8.7011.2
(lb/100ft2)
0Background (max)
Trip
(max)(current)
Connection
Average
N/A
Silt
2406'0.739
Type
114'
0 000
0 0
C-4n
TuffCoal
C-5i
CementLst
46.8
2520'
900966759
N/A
N/A
Testing BOP
PV
Clyst
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Casing shoe @ 2,509'Conductor 94.0 H-40
GvlSh
Grade
Chromatograph (ppm)
C-5nC-1Units*
N/A Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
0
2520'
2520'
0'
Max @ ft Current
N/AN/A
Date:
0
surface riser, remove from cellar. Rig-up Quad jetting tool. Perform top job. Hold a pre-job safety meeting in preparation for nipple
0
0
80.0
C-4i
N/AMinimum
N/A0
cP
Hours
25.057
Mud TypeDepth
Mud Data
TFA
in
pH
Bit #Bit Type
13
Depth in / out WOBFootage
0
Siltst
Gas Summary
(current)
0
Casing
Summary
Lithology (%)
C-2
Ss
Depth
Cly
MBT
(ppb Eq)
0
0
0
907-670-4047Unit Phone:
0
Andrew Bongard
Maximum 0
Report By:Logging Engineers:Andrew Bongard/Jeremy Tiegs
Size
20.00''114'
Set At
.
.
*
24 hr Recap:
Size
20.00''114'
Set At
907-670-4047Unit Phone:
0
David McKechnie
Maximum 0
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
0
0
0
Cly
MBT
(ppb Eq)
Casing
Summary
Lithology (%)
C-2
Ss
Depth
Siltst
Gas Summary
(current)
0
Mud Data
TFA
in
pH
Bit #Bit Type
16
Depth in / out WOBFootage
cP
Hours
25.064
Mud TypeDepth
80.0
C-4i
N/AMinimum
N/A0
0
rams. Installed wear ring. Made up BHA. Shallow Tested MWD at 1,495' MD. Serviced rig. Continued running in the hole. Tagged
0
0
2520'
2520'
0'
Max @ ft Current
N/AN/A
Date:
N/A Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
C-5nC-1Units*
Chromatograph (ppm)
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Casing shoe @ 2,509'Conductor 94.0 H-40
900966759
Drill Out Cement
PV
Clyst Sh
Grade
46.8
2520'
2
C-5i
CementLstGvl
000
0 00
0
114'
0.863 2520'
0
C-4n
TuffCoal
2406'0.739
Type
PDC 9.875
Average
N/A
(max)
Trip
(max)(current)
Connection0Background
RPM
ml/30min
10.4013.3
(lb/100ft2)
0 000
0
0
N/A 10,000 Units 100% Gas In Air=
2520'
20Spud
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.70
Mill Tooth
9.70
Size
28.50
Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
2520'
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to2520'
N/A
Depth
Alpine
Morning Report Report # 7
Customer:
Well:
Area:
Location:
Rig:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
ROP (ft/hr)
4.19 @
Avg Min
0
0
23-Dec-2013
23:59
Current Pump & Flow Data:
0
Max
N/A
ECD
(ppg)
95%
D. Mickey/R. Wall
C-3
Cht
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
Continued testing BOP. Picked up MWD tools. Made up Dutch Riser and performed dummy run. Retested lower
mg/l
Weight
cement at 2,353' MD. Tested casing for 30 minutes. Blowing down lines in preparation to drill out cement at report time.
API FL
200.00
YP Chlorides
8.0
Comments
.
.
*
24 hr Recap:
Size
20.00''
2509'
114'
Set At
10.750
907-670-4047Unit Phone:
0
David McKechnie
Maximum 78797
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
0
339
45.5
Cly
MBT
(ppb Eq)
20'2540'
cP
2723
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
L-80
Gas Summary
(current)
Depth
Mud Data
TFA
in
pH
Bit #Bit Type
23
Depth in / out WOBFootage
Mud TypeDepth
80.046.8114' 2406'0.739
N/AMinimum
2816'728
0
Performed loeak off test. Displaced well to 9.6 ppg LSND. Monitored well. Pulled out of the hole, monitoring volume to 191' MD.
116
0
2520'
3281'
761'
Max @ ft Current
3227'175.0
Date:
338.0
Units*
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
C-4i C-5nC-1
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
900966759
Drilling Ahead
PV
Clyst Sh
Grade
2520'
2
C-5i
CementLstGvl
Chromatograph (ppm)
000
129 0272
0
0.863 0.20 2520'
0
C-4n
TuffCoal
Type Weight
Siltst
PDC 9.875
Average
(max)
Trip
(max)(current)
Connection0BackgroundN/A
11973
6.8
(lb/100ft2)
108 065
1343
0
N/A 10,000 Units 100% Gas In Air=
2520'
7Spud
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.60
Mill Tooth
9.60
Size
28.50
Hours
2.540
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Gamma Ray, Directional N/A
ROP
MWD Summary
24 hr MaxAvg
to2520'
135.0
Depth
2520'
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
745
178
Morning Report Report # 8
Customer:
Well:
Area:
Location:
D. Mickey/R. Wall
ROP (ft/hr)
4.19 @
Rig:
C-3
Cht
24-Dec-2013
23:59
Current Pump & Flow Data:
1910
Max
N/A
ECD
(ppg)
95%
Drilled out cement and float shoe, continued drilling out 20' of new hole. Circulated and conditioned mud.
mg/l
40 2-3-BT-G-X-1/8-CT-DTF
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
350.00
5
YP Chlorides
5.5
RPM
ml/30min
9.80
Comments
began drilling at 2,540' MD. Drilling ahead to 3281' MD at report time.
Laid down BHA. Made up new BHA and ran into the hole, monitoring displacement on the trip tank. Shallow tested MWD and
3 PDC 9.875 0.863
.
.
*
24 hr Recap:
--3 PDC 9.875 0.863 -
Comments
400.00
5
YP Chlorides
7.0
RPM
ml/30min
10.20
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
Drilled ahead to 4413' MD. Circulated 2 bottoms up. Flow checked- Static. Pulled out of the hole on the trip tank to
mg/l
40 2-3-BT-G-X-1/8-CT-DTF
Cht
25-Dec-2013
23:59
Current Pump & Flow Data:
N/A
Max
N/A
ECD
(ppg)
95%
D. Mickey/R. Wall
ROP (ft/hr)
4.19 @
Rig:
Avg Min
N/A
N/A
Morning Report Report # 9
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to2520'
N/A
Depth
4413'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
9.65
Mill Tooth
9.70
Size
28.50
Hours
16.340 9Spud
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
1618
0
N/A
319 0268210264
0Background N/A
(max)
Trip
(max)(current)
Connection
PDC 9.875
Average
Type
2540' 4413'
Weight
Siltst
C-4n
TuffCoal
0
0.863 0.20 2520'
0
1873'-
Chromatograph (ppm)
000
490 26202
2
C-5i
CementLst
900966759
L/D BHA
PV
Clyst Sh
Grade
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
C-5nC-1 C-3 C-4i
4413'
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Gvl
3281'
4413'
1132'
Max @ ft Current
3486'175.0
Date:
265.0
744' MD. Flow checked- Static. Continued pulling out of the hole to 187' MD. Laying down BHA at report time.
114
0N/AMinimum
4254'747
0
Mud TypeDepth
80.046.8114' 2406'0.739
5.2
(lb/100ft2)
2520'
Mud Data
TFA
in
pH
Bit #Bit Type
21
Depth in / out WOBFootage
L-80
Gas Summary
(current)
DepthUnits*
3704
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
(ppb Eq)
20'2540'
cP
0
675
907-670-4047Unit Phone:
7
David McKechnie
Maximum 74970
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
Size
20.00''
2509'
114'
Set At
10.750
4 FX65S 9.875 0.863 4413'
.
.
*
24 hr Recap:
4413'
10.750
4 FX65S 9.875 0.863
Logging Engineers:David McKechnie/Jeremy Tiegs
Size
20.00''
2509'
114'
Set At
907-670-4047Unit Phone:
244
David McKechnie
Maximum 95311
Report By:
cP
0
535
C-2
Ss
45.5
Cly
MBT
(ppb Eq)
20'2540'
Units*
6019
Casing
Summary
Lithology (%)
Surface Casing
WOBFootage
L-80
Gas Summary
(current)
Depth
(lb/100ft2)
2520'
Mud Data
TFA
in
pH
Bit #Bit Type
26
Depth in / out
Minimum
2578'902
0
Continued running in the hole to 2,624' MD. Circulated 2 bottoms up and encountered 902 units of trip gas and cuttings unloading
120
0N/A
4413'
5393'
980'
Max @ ft Current
5195'70.0
Date:
318.0
Time:
SPP (psi)
Gallons/stroke
Gvl
80.046.8
4.74413'
Mud TypeDepth
114'
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
900966759
Drilling Ahead
PV
Clyst Sh
Grade
2
C-5i
CementLst
000
817 155339
0
0.863 0.20 2520'
0
1873'-
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
Siltst
PDC 9.875
Average
(max)
Trip
(max)(current)
Connection34Background2578
9125 268 22987
29257
2
N/A 10,000 Units 100% Gas In Air=
9Spud
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.85
Mill Tooth
9.80
Size
28.50
Hours
18.042
0.739
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
MWD Summary
24 hr MaxAvg
to4413'
60.0
Depth
5393'
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
599
143
Morning Report Report # 10
Customer:
Well:
Area:
Location:
D. Mickey/R. Wall
ROP (ft/hr)
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Cht
26-Dec-2013
23:59
Current Pump & Flow Data:
1680
Max
N/A
ECD
(ppg)
95%
Laid down BHA #3. Made up BHA #4 and began runnin the hole with same to 1,465' MD. Shallow Tested MWD tools.
mg/l
40 2-3-BT-G-X-1/8-CT-DTF
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
5
YP Chlorides
8.0
RPM
ml/30min
9.60
2406'
Comments
at the shakers. Ran he hole to 4,319' MD. Drilling ahead to 5,403' MD at report time.
--3 PDC 9.875 0.863 -
.
.
*
24 hr Recap:
Circulated two bottoms up. Noted 304 units of gas.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
2406'
5 6064'
Comments
YP Chlorides
8.0
RPM
ml/30min
9.40
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
Continued drilling ahead to 6,064' MD. Pumped weighted sweep and circulated 2 bottoms up. Flow checked- Static
mg/l
40 2-3-BT-G-X-1/8-CT-DTF
--
Cht
27-Dec-2013
23:59
Current Pump & Flow Data:
1760
Max
N/A
ECD
(ppg)
95%
D. Mickey/R. Wall
ROP (ft/hr)
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Avg Min
695
166
Morning Report Report # 11
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to4413'
0.0
Depth
5393'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
9.85
Mill Tooth
9.80
Size
28.50
Hours
16.341
0.739
9Spud
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
472
0
N/A
56 0005088
40Background 304
(max)
Trip
(max)(current)
Connection
PDC 9.875
Average
Type
2540' 4413'
Weight
-
Siltst
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
-
1873'8
5
000
73 062
0
C-5i
CementLst
900966759
Trip out hole
PV
Clyst Sh
Grade
-
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
-
C-5nC-1 C-3 C-4i
4413'
0.863
Mud TypeDepth
114'
2
Time:
SPP (psi)
Gallons/stroke
Gvl
80.046.8
3.4
5393'
6064'
671'
Max @ ft Current
5704'115.0
Date:
316.0
Decision was made to pull out of the hole to remove stabilizers hindering directional build. Tripped out of the hole to 2,624' MD.
56
0N/AMinimum
2624'304
0
(lb/100ft2)
2520'
Mud Data
TFA
in
pH
Bit #Bit Type
28
Depth in / out WOBFootage
L-80
Gas Summary
(current)
DepthUnits*
1552
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
178
907-670-4047Unit Phone:
0
David McKechnie
Maximum 34389
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
FX65S
Size
20.00''
2509'
114'
Set At
-4413'
10.750
4 FX65S 9.875 0.863
9.875
.
.
*
24 hr Recap:
226'-FX65S 9.875 0.863 15.50 6064' 6290'
15.50 4413'
10.750
4 FX65S 9.875 0.863
5
Size
20.00''
2509'
114'
Set At
907-670-4047Unit Phone:
0
David McKechnie
Maximum 90411
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
0
273
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
3943
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
Gas Summary
(current)
DepthUnits*
Mud Data
TFA
in
pH
Bit #Bit Type
22
Depth in / out WOBFootage
Minimum
6011'845
0
BHA as per Schlumberger. Ran in the hole to 2,615' MD Tested MWD and circulated bottoms up. Noted 462 units of gas.
85
0N/A
6064'
6290'
226'
Max @ ft Current
6290'32.0
Date:
179.0
Gallons/stroke
Gvl
80.046.8
3.3
(lb/100ft2)
L-80
6290'
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
0-1-CT-G-X-I-NO-BHA
900966759
CBU for TOH
PV
Clyst Sh
Grade
80
C-5i
CementLst
000
320 16196
0
0.863 0.20 2520'
0
15
1873'8
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
Siltst
9.875
Average
(max)
Trip
(max)(current)
Connection52Background845
6149 92 057
1401
0
N/A 10,000 Units 100% Gas In Air=
9WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.80
Mill Tooth
9.80
Size
28.50
Hours
20.039
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
MWD Summary
24 hr MaxAvg
to6064'
160.0
Depth
6290'
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
740
177
Morning Report Report # 12
Customer:
Well:
Area:
Location:
ROP (ft/hr)
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
28-Dec-2013
23:59
Current Pump & Flow Data:
2500
Max
N/AECD (ppg)
95%
D. Mickey/D. Lutrick
40 2-3-BT-G-X-1/8-CT-DTF
Cht
PDC
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
YP Chlorides
8.5
RPM
ml/30min
9.30
mg/l
2406'
6
Comments
Decision was made to pull out of the hole due to difficulty to slide. Circulating bottoms up in preparation for trip at report time.
Continued running in the hole to 6006' MD. Circulated bottoms up. Noted max gas of 845 units. Drilled ahead to 6290' MD.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Pulled out of the hole to 834' MD. Tested anular. Tested top and bottom rams. Pulled out of the hole and altered
.
.
*
24 hr Recap:
Calibrated gas equipment. Made up BHA #6 and began tripping into the hole. Filled BHA and HWDP at 875' MD - Noted 81 units of
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Completed circulating/conditioning in preparation for tripping out of the hole. Pulled out of the hole on trip tank
2406'
6 6290'
Comments
gas.
YP Chlorides
8.0
RPM
ml/30min
9.00
mg/l
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
40 2-3-BT-G-X-1/8-CT-DTF
--
Cht
PDC
29-Dec-2013
23:59
Current Pump & Flow Data:
-
Max
N/AECD (ppg)
95%
J.Welsh/Ed Grazullis
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Avg Min
-
-
Morning Report Report # 13
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to6290'
N/A
Depth
6290'
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
9.90
Mill Tooth
9.90
Size
28.50
Hours
14.045
0.739 2520'
8WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
43
0
N/A
0 000770
0Background 845
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
Siltst
Msi 516 PDC
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
5
000
0 00
0
C-5i
CementLst
900966759
TIH with BHA #6
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
6290'
0.863
Mud TypeDepth
114'
2
Gallons/stroke
Gvl
80.046.8
3.1
(lb/100ft2)
L-80
6290'
6290'
0'
Max @ ft Current
N/AN/A
Date:
N/A
to 2,500' MD. Flow checked- Slight drop in volume. Continued tripping out to surface. Laid down BHA. Slip and cut drill line.
7
0N/AMinimum
875'81
0
Mud Data
TFA
in
pH
Bit #Bit Type
24
Depth in / out WOBFootage
Gas Summary
(current)
DepthUnits*
264
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
0
907-670-4047Unit Phone:
0
David McKechnie
Maximum 9158
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
Size
20.00''
2509'
114'
Set At
15.50 4413'
10.750
4 FX65S 9.875 0.863
9.875
5 226'---FX65S 9.875 0.863 15.50 6064' 6290'
.
.
*
24 hr Recap:
6403' 113'---6 Msi 516 PDC 9.875 0.863 6290'
226'---FX65S 9.875 0.863 15.50 6064' 6290'
15.50 4413'
10.750
4 FX65S 9.875 0.863
5
Size
20.00''
2509'
114'
Set At
907-670-4047Unit Phone:
0
David McKechnie
Maximum 100094
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
0
177
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
3804
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
(current)
DepthUnits*
Mud Data
TFA
in
pH
Bit #Bit Type
25
Depth in / out WOBFootage
Minimum
2600'915
0
Ran in the hole to 6,393' MD. Washed down the last stand. Drilled ahead to 6,393' MD. Stopped to trouble shoot MWD tool. Drilled
38
0N/A
6290'
6403'
113'
Max @ ft Current
6403'180.0
Date:
273.0
Gvl
80.046.8
L-80
6403'
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
0-1-CT-G-X-I-NO-BHA
900966759
Preparing BHA #7
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
105 088
0
0.863 0.20 2520'
0
15
1873'8
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
Siltst
9.875
Average
(max)
Trip
(max)(current)
Connection0Background915
3868 56 033
Preparing BHA #7 at report time.
738
0
N/A 10,000 Units 100% Gas In Air=
9WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.90
Mill Tooth
9.90
Size
28.50
Hours
15.045
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
MWD Summary
24 hr MaxAvg
to6290'
N/A
Depth
6403'
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
-
-
Morning Report Report # 14
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
30-Dec-2013
23:59
Current Pump & Flow Data:
-
Max
N/AECD (ppg)
95%
J.Welsh/Ed Grazullis
40 2-3-BT-G-X-1/8-CT-DTF
Cht
PDC
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
YP Chlorides
8.5
RPM
ml/30min
10.00
mg/l
3.0
(lb/100ft2)
2406'
7
Comments
hole on the trip tank to 2,514' MD. Flow checked- Observed slight drop. Pulled out of the hole to surface and laid down tools.
ahead to 6,403' MD. Circulated and conditioned one bottoms up in preparation for trip. Flow checked- Slight drop. Pulled out of the
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Continued running in the hole to 2,609' MD. Tested MWD and circulated bottoms up. Noted 915 units of gas.
.
.
*
24 hr Recap:
1,641 units. Racked back two stands and calibrated weight indicator. Running in the hole to 5,907' MD at report time.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Trouble shoot and service top drive while BHA #7 was being repared in the pipe shed. Changed out inverter. Made
2406'
7 6403'
Comments
YP Chlorides
8.5
RPM
ml/30min
9.00
mg/l
3.0
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
40 2-3-BT-G-X-1/8-CT-DTF
--
Cht
PDC
31-Dec-2013
23:59
Current Pump & Flow Data:
-
Max
N/AECD (ppg)
95%
J.Welsh/Ed Grazullis
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
-
-
Morning Report Report # 15
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to6403'
N/A
Depth
6403'
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
9.90
Mill Tooth
9.90
Size
28.50
Hours
16.342
0.739 2520'
9WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
739
0
N/A
14 0002529
(current)
Connection60Background1641
(max)
Trip
(max)
Siltst
Msi 516 PDC
9.875
Average
Type
2540' 4413'
Weight
-
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
5
000
62 082
0
C-5i
CementLst
Gas Summary
900966759
Trip in hole W/BHA #7
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
6403'
0.863
Mud TypeDepth
114'
2
Gvl
80.046.8
L-80
6403'
6403'
0'
Max @ ft Current
N/AN/A
Date:
N/A
up BHA and ran in the hole to 1,668' MD. Shallow tested MWD. Ran in the hole to 2,610. Circulated bottoms up. Noted max gas of
24
0N/AMinimum
2610'1641
0
Mud Data
TFA
in
pH
Bit #Bit Type
23
Depth in / out WOBFootage
(current)
DepthUnits*
5154
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
82
907-670-4047Unit Phone:
0
David McKechnie
Maximum 169452
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
5
Size
20.00''
2509'
114'
Set At
6290'
15.50 4413'
10.750
4 FX65S 9.875 0.863
9.875
6290'
226'10 80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
.
.
*
24 hr Recap:
units of gas at 7,507' MD. Increaed mud weight to 10.2 ppg. Encountered max gas of 9,226 units at 7,600' MD. Circulated out
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Continued running in the hole to 6,285' MD, washing down the last stand. Circulated bottoms up, noting 290 units
2406'
7 6403'
Comments
peak gas to a background of 330 units and resumed drilling to intermediate TD at 7,672' MD. Pumped sweep around upon TD.
YP Chlorides
11.5
RPM
ml/30min
9.20
mg/l
3.3
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
40 2-3-BT-G-X-1/8-CT-DTF
--
Cht
PDC
Siltst
1-Jan-2014
23:59
Current Pump & Flow Data:
-
Max
N/AECD (ppg)
95%
J.Welsh/Ed Grazullis
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
-
-
Morning Report Report # 16
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to6403'
N/A
Depth
6403'
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
Directional N/A
ROP
10.20
Mill Tooth
10.20
Size
28.50
Hours
16.341
0.739 2520'
10WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
Pulled out of the hole on elevators to 7,105' MD. Back reamed out to 6,379' MD. Circulated bottoms up noting 150 units of gas.
32694
83
N/A
1878 8921553737298
0Background 290
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
-
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
5
000
8746 17803613
0
C-5i
CementLst
Gas Summary
900966759
N/A
N/A
Circulate / Condition
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
6403'
0.863
Mud TypeDepth
114'
2
Gvl
80.046.8
L-80
10
6403'
7672'
1269'
Max @ ft Current
N/AN/A
Date:
N/A
of trip gas. Resumed drilling intermediate hole to 6,959' MD. Added 275 bbls of spike fluid at 7,080' MD. Circulated out 6,000
548
Tripped in the hole to 7,600' MD. Circulated bottoms up while reciprocating pipe at 120-150 RPM. Noted 680 units of gas at
0N/AMinimum
7600'9226
0
Mud Data
TFA
in
pH
Bit #Bit Type
25
Depth in / out WOBFootage
(current)
DepthUnits*
51639
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
3080
bottoms up.
907-670-4047Unit Phone:
1979
David McKechnie
Maximum 546634
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
Size
20.00''
2509'
114'
Set At
10.750
4 FX65S 9.875 0.863
9.875
6290'
5
Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
.
.
*
24 hr Recap:
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
4 FX65S 9.875 0.863
9.875
6290'
5
Msi 516 PDC
Size
20.00''
2509'
114'
Set At
10.750
907-670-4047Unit Phone:
256
David McKechnie
Maximum 50705
Report By:Logging Engineers:David McKechnie/Jeremy Tiegs
0
96
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
4585
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
(current)
DepthUnits*
Mud Data
TFA
in
pH
Bit #Bit Type
26
Depth in / out WOBFootage
Minimum
7600'680
0
Pumped 95 bbl wellbore strengthening pill on bottom. MAD passed from 6,379' MD to 6,191' MD. Monitored well - Static
25
0N/A
7672'
7672'
0'
Max @ ft Current
N/AN/A
Date:
N/A
Gvl
80.046.8
L-80
10
6403'
0.863
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor 94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
900966759
-
-
Change Out RAMS
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
981 246367
0
0.863 0.20 2520'
0
-
15
1873'8
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
-
6290'
15.50 4413'
226'
9.875
Average
(max)
Trip
(max)(current)
Connection0Background680
1354 64 1730
Laid down BHA. Changing out upper pipe rams at report time.
2839
1
N/A 10,000 Units 100% Gas In Air=
10WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
10.30
Mill Tooth
10.30
Size
28.50
Hours
16.341
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
-
-
Morning Report Report # 17
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
2-Jan-2014
23:59
Current Pump & Flow Data:
-
Max
N/AECD (ppg)
95%
K. Harding / A. Dorr
40 2-3-BT-G-X-1/8-CT-DTF
--
Cht
PDC
Siltst
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
YP Chlorides
12.0
RPM
ml/30min
9.00
mg/l
-
(lb/100ft2)
2406'
7 6403'
Comments
Backreamed out of the hole to 2,515' MD. Pumped sweep and circulated casing clean. Resumed tripping out to 730'' MD.
Pulled out of the hole on trip tank to 4,682' MD. MAD passed to 4,399' MD. Pulled out of the hole on trip tank to 2,985' MD.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Circulated two bottoms up at 7600' MD after short tripping to 6400' MD. Noted 680 units of gas upon first bottoms up.
.
.
*
24 hr Recap:
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
4 FX65S 9.875 0.863
9.875
6290'
5
Msi 516 PDC
Size
20.00''
2509'
114'
Set At
10.750
907-670-4047Unit Phone:
0
David McKechnie
Maximum 49206
Report By:Logging Engineers:David McKechnie/Tyler Dretke
0
417
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
2038
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
(current)
DepthUnits*
Mud Data
TFA
in
pH
Bit #Bit Type
25
Depth in / out WOBFootage
Minimum
2505'443
0
casing. Rigged up Testco and casing equipment. Ran intermediate casing to 2,495. Circulated bottoms up at the shoe, noting
96
0N/A
7672'
7672'
0'
Max @ ft Current
N/AN/A
Date:
N/A
Gvl
80.046.8
L-80
10
6403'
0.863
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
8.50
94.0 H-40
170
0-1-CT-G-X-I-NO-BHA
900966759
-
-
Circulate / Condition
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
126 365
0
0.863 0.20 2520'
0
22
15
1873'8
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
7672'
6290'
15.50 4413'
226'
9.875
Average
(max)
Trip
(max)(current)
Connection180Background680
10126 130 078
and conditioning at 60 SPM while reciprocating pipe at report time. Adding water at 15-25 bbls/hr, diluting mud weight to 10.3 ppg.
495
0
N/A 10,000 Units 100% Gas In Air=
10WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
10.50
Mill Tooth
10.30
Size
28.50
Hours
17.544
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
250
60
Morning Report Report # 18
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
3-Jan-2014
23:59
Current Pump & Flow Data:
400
Max
N/AECD (ppg)
95%
K. Harding / A. Dorr
40 2-3-BT-G-X-1/8-CT-DTF
1269'0-1-CT-G-X-I-NO-TD
Cht
PDC
Siltst
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
YP Chlorides
12.5
RPM
ml/30min
9.00
mg/l
3.0
(lb/100ft2)
2406'
7 6403'
Comments
7,623' MD. Made up hanger and landing joint. Landed hanger on second attempt. Staged up pumps to circulate. Circulating
443 units of max gas. Continued running to 5,510' MD. Circulated bottoms up with an average gas of 200 units. Ran in the hole to
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Completed changing out upper RAMS and tested same. Performed 7-5/8" dummy run. Held PJSM for running
.
.
*
24 hr Recap:
Pumped 15.8 ppg cement and displaced with rig pumps. Bumped plug. Rigged down cement head and set pack off. Tested
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Staged up pumps to 6 bbls/minute. Landed casing. Rigged down Tesco and rigged up cement head. Circulated
2406'
7 6403'
29.0
Comments
same. Laying down 5" drill pipe at report time.
YP Chlorides
12.0
RPM
ml/30min
9.00
mg/l
2.8
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
400.00
40 2-3-BT-G-X-1/8-CT-DTF
1269'0-1-CT-G-X-I-NO-TD
Cht
7662'
PDC
Siltst
4-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/AECD (ppg)
95%
K. Harding / A. Dorr
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
N/A
N/A
Morning Report Report # 19
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
10.20
Mill Tooth
10.20
Size
28.50
Hours
17.539
0.739 2520'
9WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
445
0
N/A
47 0161902
0Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
7672'
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
22
15
1873'8
Intermediate
5
000
93 048
0
C-5i
CementLst
Gas Summary
900966759
N/A
N/A
Pipe Management
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
8.50
94.0 H-40
170
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
6403'
0.863
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
7672'
7672'
0'
Max @ ft Current
N/AN/A
Date:
N/A
and conditioned. Pumped cement job. Displaced with rig pumps- Plug did not bump. Waited on cement and opened stage collar.
23
0N/AMinimum
2413'476
0
Mud Data
TFA
in
pH
Bit #Bit Type
19
Depth in / out WOBFootage
(current)
DepthUnits*
2154
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
110
907-670-4047Unit Phone:
0
David McKechnie
Maximum 54148
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
9.875
6290'
5
Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
.
.
*
24 hr Recap:
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Continued laying down 5" drill pipe. Picked up and racked back 4" drill pipe. Testing BOP at report time
2406'
7 6403'
29.0
Comments
YP Chlorides
12.0
RPM
ml/30min
9.00
mg/l
2.8
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
450.00
40 2-3-BT-G-X-1/8-CT-DTF
1269'0-1-CT-G-X-I-NO-TD
Cht
7662'
PDC
Siltst
5-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/AECD (ppg)
95%
K. Harding / A. Dorr
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
N/A
N/A
Morning Report Report # 20
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
-
Mill Tooth
10.20
Size
28.50
Hours
17.539
0.739 2520'
8WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
0
0
N/A
0 0000
0Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
7672'
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
22
15
1873'8
Intermediate
5
000
0 00
0
C-5i
CementLst
Gas Summary
900966759
-
-
Testing BOP
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
8.50
94.0 H-40
170
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
6403'
0.863
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
7672'
7672'
0'
Max @ ft Current
N/AN/A
Date:
N/A
0
0N/AMinimum
N/A0
0
Mud Data
TFA
in
pH
Bit #Bit Type
18
Depth in / out WOBFootage
(current)
DepthUnits*
0
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
0
907-670-4047Unit Phone:
0
David McKechnie
Maximum 0
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
9.875
6290'
5
Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
.
.
*
24 hr Recap:
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
4 FX65S 9.875 0.863
6.750
6290'
5
PDC
7 Msi 516 PDC
Size
20.00''
2509'
114'
Set At
10.750
7.63''
907-670-4047Unit Phone:
0
David McKechnie
Maximum 723
Report By:Logging Engineers:David McKechnie/Tyler Dretke
0
3
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
71
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
(current)
DepthUnits*
Mud Data
TFA
in
pH
Bit #Bit Type
18
Depth in / out WOBFootage
Minimum
-11
0
Continued running in the hole to 1,836' MD. Shallow tested MWD again. Continued in the hole on singles to 4,888' MD. Rigged
4
0N/A
7672'
7672'
0'
Max @ ft Current
N/AN/A
Date:
N/A
L-80
Gvl
80.046.8
L-80
10
6403'
0.863
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
900966759
-
-
RIH on singles
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
0 00
0
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
6290'
15.50 4413'
226'
9.875
Average
(max)
Trip
(max)(current)
Connection0BackgroundN/A
53 2 000
55
0
N/A 10,000 Units 100% Gas In Air=
8WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
-
Mill Tooth
10.00
Size
28.50
Hours
16.344
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
N/A
N/A
Morning Report Report # 21
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
5-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/AECD (ppg)
95%
K. Harding / A. Dorr
40 2-3-BT-G-X-1/8-CT-DTF
-
Cht
7662'
PDC
Siltst
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
450.00
YP Chlorides
12.0
RPM
ml/30min
9.20
mg/l
-
(lb/100ft2)
2406'
8 7672'
29.0
Comments
Circulated bottoms up and tested casing to 3,500 psi for 30 minutes. Runnind in the hole on singles to 5,174' MD at report time.
up and tested casing to 1000 psi. Washed down to 4,995' MD. Drilled out stage collar. Washed and reamed to 5,174' MD.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Finished testing BOP. Made up BHA and ran in the hole on 4" drill pipe singles to1,549' MD. Shallow tested MWD.
.
.
*
24 hr Recap:
7672' 7672' 0'---
7672' 0'---
9 MSI 513 PDC 6.750 0.383 -
8 MSI 513 PDC 6.750 0.383 -7672'
1519'. Shallow tested MWD. Failure. Pulled out of the hole to lay down BHA at report time.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Continue to run into hole to 7150'. Wash and ream to top of cement at 7460'. Drill out cement to 7530'. Driiled to
2406'
10 7672'
29.0
Comments
YP Chlorides
10.0
RPM
ml/30min
10.80
mg/l
5.7
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
450.00
40 2-3-BT-G-X-1/8-CT-DTF
-
Cht
7662'
PDC
Siltst
7-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/A
ECD
(ppg)
95%
K. Harding / A. Dorr
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
N/A
N/A
Morning Report Report # 22
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
10.00
Mill Tooth
10.00
Size
28.50
Hours
17.548
0.739 2520'
10WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
0
0
N/A
0 0000
0Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
000
0 00
0
C-5i
CementLst
Gas Summary
900966759
-
-
lay down BHA
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
7672'
7672'
0'
Max @ ft Current
N/AN/A
Date:
N/A
7652' circulated two bottoms up. Flow check. Static. Tripped out of hole to lay down BHA. Made up BHA #9. Tripped into the hole to
1
0N/AMinimum
-8
0
Mud Data
TFA
in
pH
Bit #Bit Type
16
Depth in / out WOBFootage
(current)
DepthUnits*
0
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
0
907-670-4047Unit Phone:
0
Hilary Garney
Maximum 65
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00
8 MSI 513 PDC 6.750 0.383 0.00 7672'
9.4 ppg OBM. Performed FIT to 12.5 ppg. Drilling ahead to 7802' MD with background gas of 1,670 units at report time.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Made up BHA #10. Ran in the hole to 566' MD. Shallow tested MWD - Success. Continued in the hole to 7,621' MD.
2406'
10 7672'
29.0
Comments
YP Chlorides
-
RPM
ml/30min
-
mg/l
1.4
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
36500.00
40 2-3-BT-G-X-1/8-CT-DTF
-
Cht
7662'
PDC
Siltst
8-Jan-2014
23:59
Current Pump & Flow Data:
2315
Max
N/A
ECD
(ppg)
95%
K. Harding / A. Dorr
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
247
59
Morning Report Report # 23
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
85.0
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
9.50
Mill Tooth
9.40
Size
28.50
Hours
-59
0.739 2520'
17WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
4340
1
N/A
312 0276112652
1670Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
000
1119 171461
0
C-5i
CementLst
Gas Summary
900966759
-
-
Drilling Ahead
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
7672'
8002'
330'
Max @ ft Current
7719'95.0
Date:
116.0
Slip and cut drill line. Washed down stand and drilled out cement and 20' of formation. Noted 648 units of gas. Displaced well to
145
0N/AMinimum
7930'1759
0
Mud Data
TFA
in
pH
Bit #Bit Type
10
Depth in / out WOBFootage
(current)
DepthUnits*
90
8152
Casing
Summary
Lithology (%)
10
Surface Casing
C-2
Ss
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
0
732
907-670-4047Unit Phone:
174
Hilary Garney
Maximum 169368
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
Size
20.00''
2509'
114'
Set At
10.750
7.63''
907-670-4047Unit Phone:
96
David McKechnie
Maximum 172738
Report By:Logging Engineers:David McKechnie/Tyler Dretke
0
3800
45.5
Cly
MBT
1651'
(ppb Eq)
20'2540'
6064'
cP
8635
Casing
Summary
Lithology (%)
10
Surface Casing
C-2
Ss
(current)
DepthUnits*
90
Mud Data
TFA
in
pH
Bit #Bit Type
13
Depth in / out WOBFootage
Minimum
9242'1839
0
gas of 1009 units. 24 hour average of 719 units. Lithology consists of 90+% fine grain sand stone and 10% siltstone with
719
0N/A
8002'
9430'
1428'
Max @ ft Current
8672'95.0
Date:
122.0
L-80
Gvl
80.046.8
L-80
10
7662'
0.383
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
900966759
-
-
Drilling Ahead
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
662 64327
0
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
6290'
15.50 4413'
226'
9.875
Average
(max)
Trip
(max)(current)
Connection425BackgroundN/A
70826 1571 1154343
3426
3
N/A 10,000 Units 100% Gas In Air=
16WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.50
Mill Tooth
9.40
Size
28.50
Hours
-53
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
MWD Summary
24 hr MaxAvg
to-
75.0
Depth
-
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
247
59
Morning Report Report # 24
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
9-Jan-2014
23:59
Current Pump & Flow Data:
2450
Max
N/A
ECD
(ppg)
95%
K. Harding / A. Dorr
40 2-3-BT-G-X-1/8-CT-DTF
-
Cht
7662'
PDC
Siltst
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
35000.00
YP Chlorides
11.9
RPM
ml/30min
-
mg/l
3.8
(lb/100ft2)
2406'
10 7672'
29.0
Comments
occasional traces of coal. Drilling ahead to 9430' MD at report time.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Drilled ahead from 8002' MD, backreaming full stand and flow checking at every connection. Average background
8 MSI 513 PDC 6.750 0.383 0.00 7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00 7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
.
.
*
24 hr Recap:
7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00
8 MSI 513 PDC 6.750 0.383 0.00 7672'
fine grain sandstone.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Drilled ahead from 9,430' MD with an average background gas of 879 units. Backreamed and flow checked at every
2406'
10 7672'
29.0
Comments
YP Chlorides
11.9
v
RPM
ml/30min
755.00
mg/l
4.3
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
34500.00
40 2-3-BT-G-X-1/8-CT-DTF
-
Cht
7662'
PDC
Siltst
10-Jan-2014
23:59
Current Pump & Flow Data:
2580
Max
N/A
ECD
(ppg)
95%
K. Harding / A. Dorr
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
248
60
Morning Report Report # 25
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
90.0
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
9.50
Mill Tooth
9.40
Size
28.50
Hours
34500.048
0.739 2520'
16WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
3352
2
N/A
1326 113129755849
61Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
000
677 90326
0
C-5i
CementLst
Gas Summary
900966759
-
-
Drilling Ahead
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
9430'
10844'
1414'
Max @ ft Current
9819'105.0
Date:
208.0
connection. Performed dilution at 9,700' and 10,700' MD. Drilling ahead to 10,844' MD at report time. Lithology consists of 100%
586
0N/AMinimum
10695'1679
0
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
13
Depth in / out WOBFootage
(current)
DepthUnits*
100
8533
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
CaCl2
1651'
(ppb)
20'2540'
6064'
cP
0
3146
907-670-4047Unit Phone:
48
David McKechnie
Maximum 155661
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00
8 MSI 513 PDC 6.750 0.383 0.00 7672'
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Drilled ahead from 10844' MD with an average background gas of 885 units. Backreamed and flow checked at every
2406'
10 7672'
29.0
Comments
YP Lime
12.4
v
RPM
ml/30min
790.00
lb/bbl
4.1
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
2.08
40 2-3-BT-G-X-1/8-CT-DTF
-
Cht
7662'
PDC
Siltst
11-Jan-2014
23:59
Current Pump & Flow Data:
2980
Max
N/A
ECD
(ppg)
95%
K. Harding / A. Dorr
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
264
63
Morning Report Report # 26
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
77.0
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
9.50
Mill Tooth
9.40
Size
28.50
Hours
35000.046
0.739 2520'
14WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
3656
3
N/A
1436 214833755480
82Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
000
742 94355
0
C-5i
CementLst
Gas Summary
900966759
-
-
Drilling Ahead
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
10844'
12169'
1325'
Max @ ft Current
11434'95.0
Date:
211.0
connection. Drilling ahead to 12169' MD at report time. Lithology consists of 85% fine grain sandstone and 15% silt stone.
596
0N/AMinimum
11375'2040
0
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
11
Depth in / out WOBFootage
(current)
DepthUnits*
85
9212
Casing
Summary
Lithology (%)
15
Surface Casing
C-2
Ss
45.5
Cly
CaCl2
1651'
(mg/L)
20'2540'
6064'
cP
0
3320
907-670-4047Unit Phone:
116
David McKechnie
Maximum 187797
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
Size
20.00''
2509'
114'
Set At
10.750
7.63''
907-670-4047Unit Phone:
39
David McKechnie
Maximum 97928
Report By:Logging Engineers:David McKechnie/Tyler Dretke
0
1302
45.5
Cly
CaCl2
1651'
(mg/L)
20'2540'
6064'
cP
7305
Casing
Summary
Lithology (%)
30
Surface Casing
C-2
Ss
(current)
DepthUnits*
70
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
13
Depth in / out WOBFootage
Minimum
12840'1090
0
drilling ahead to 12954' MD. Circulated 4 bottoms up. Monitored well- Static. Began backreaming out of the hole. Reaming to
192
0N/A
12169'
12956'
787'
Max @ ft Current
12679'100.0
Date:
184.0
L-80
Gvl
80.046.8
L-80
10
7662'
0.383
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
900966759
-
-
Backreaming Out of Hole
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
622 88299
0
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
12956'
6290'
15.50 4413'
226'
9.875
Average
(max)
Trip
(max)(current)
Connection46BackgroundN/A
16549 613 056147
3117
0
N/A 10,000 Units 100% Gas In Air=
13WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
9.50
Mill Tooth
9.40
Size
28.50
Hours
38500.046
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
255
61
Morning Report Report # 27
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
12-Jan-2014
23:59
Current Pump & Flow Data:
2770
Max
N/A
ECD
(ppg)
95%
K. Harding / D. Lowe
40 2-3-BT-G-X-1/8-CT-DTF
5284'-
Cht
7662'
PDC
Siltst
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
1.69
YP Lime
11.75
v
RPM
ml/30min
676.00
lb/bbl
4.2
(lb/100ft2)
2406'
10 7672'
29.0
Comments
12104' MD at report time.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Drilled ahead from 12169' MD to 12765. Backreamed out to 12481' MD. Washed down to bottom and resumed
8 MSI 513 PDC 6.750 0.383 0.00 7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00 7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
.
.
*
24 hr Recap:
7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00
8 MSI 513 PDC 6.750 0.383 0.00 7672'
out of the hole to 5,714. Flow checked well. Pulled out of the hole on trip tank to 5,657' MD. Circulated bottoms up and resumed
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Continued backreaming out of the hole to 7,717' MD. Encountered occasional tight spots. Circulated bottoms up
2406'
10 7672'
29.0
Comments
backreaming out of the hole to 5,142' MD at report time.
YP Lime
11.86
v
RPM
ml/30min
847.00
lb/bbl
3.8
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
1.37
40 2-3-BT-G-X-1/8-CT-DTF
5284'-
Cht
7662'
PDC
Siltst
13-Jan-2014
23:59
Current Pump & Flow Data:
2616
Max
N/A
ECD
(ppg)
95%
K. Harding / D. Lowe
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
289
69
Morning Report Report # 28
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
9.50
Mill Tooth
9.40
Size
28.50
Hours
35500.052
0.739 2520'
15WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
133
0
N/A
13 000406
8Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
12956'
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
-
15
1873'8
Intermediate
5
000
34 00
0
C-5i
CementLst
Gas Summary
900966759
-
-
Backreaming Out of Hole
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
-
94.0 H-40
-
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
12956'
12956'
0'
Max @ ft Current
N/AN/A
Date:
N/A
at the casing shoe. Noted average gas of 14 units while circulating at shoe. Flow checked- Noted slight drop. Resumed pumping
14
0N/AMinimum
-59
0
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
11
Depth in / out WOBFootage
(current)
DepthUnits*
296
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
CaCl2
1651'
(mg/L)
20'2540'
6064'
cP
0
29
907-670-4047Unit Phone:
0
David McKechnie
Maximum 4296
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00
8 MSI 513 PDC 6.750 0.383 0.00 7672'
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Backream out of the hole to 380' MD. Circulated 5 bottoms up. Laid down BHA. Monitored well. Observed slight drop.
2406'
10 7672'
29.0
Comments
YP Lime
11.69
v
RPM
ml/30min
932.00
lb/bbl
4.2
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
1.30
40 2-3-BT-G-X-1/8-CT-DTF
5284'2-1-CT-G-X-I-NO-TD
Cht
7662'
PDC
Siltst
14-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/A
ECD
(ppg)
95%
K. Harding / D. Lowe
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
N/A
N/A
Morning Report Report # 29
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
9.50
Mill Tooth
9.40
Size
28.50
Hours
34000.050
0.739 2520'
12WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
0
0
N/A
0 0000
3Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
12956'
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
10
15
1873'8
Intermediate
5
000
0 04
0
C-5i
CementLst
Gas Summary
900966759
-
-
Backreaming Out of Hole
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
57.20
94.0 H-40
120
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
12956'
12956'
0'
Max @ ft Current
N/AN/A
Date:
N/A
Rigged up 3.5" tubing equipment. Ran in the hole to 5266' MD. Circulated bottoms up. Running 2.875" tubing at report time.
5
0N/AMinimum
-43
0
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
13
Depth in / out WOBFootage
(current)
DepthUnits*
0
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
CaCl2
1651'
(mg/L)
20'2540'
6064'
cP
0
0
907-670-4047Unit Phone:
0
David McKechnie
Maximum 82
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00
8 MSI 513 PDC 6.750 0.383 0.00 7672'
report time.
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Ran in the hole with 3.5' tubing on 4" drill pipe to 12664' MD. Monitored well- Static. Set liner and pulled out of the
2406'
10 7672'
29.0
Comments
YP Lime
11.69
v
RPM
ml/30min
865.00
lb/bbl
4.1
(lb/100ft2)
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
1.30
40 2-3-BT-G-X-1/8-CT-DTF
5284'2-1-CT-G-X-I-NO-TD
Cht
7662'
PDC
Siltst
15-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/A
ECD
(ppg)
95%
D. Mickey / D. Lowe
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
Avg Min
N/A
N/A
Morning Report Report # 30
Customer:
Well:
Area:
Location:
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
Mill Tooth
9.40
Size
28.50
Hours
33500.051
0.739 2520'
12WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
100% Gas In Air=10,000 Units
18
0
N/A
0 00027
3Background N/A
(max)
Trip
(max)(current)
Connection
9.875
Average
Type
2540' 4413'
Weight
12956'
6290'
15.50 4413'
226'
C-4n
TuffCoal
Chromatograph (ppm)
0.863 0.20 2520'
0
10
15
1873'8
Intermediate
5
000
0 00
0
C-5i
CementLst
Gas Summary
900966759
-
-
TOH
PV
Clyst Sh
Grade
80
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
57.20
94.0 H-40
120
0-1-CT-G-X-I-NO-BHA
C-5nC-1 C-3 C-4i
7662'
0.383
Mud TypeDepth
114'
2
L-80
Gvl
80.046.8
L-80
10
12956'
12956'
0'
Max @ ft Current
N/AN/A
Date:
N/A
hole to 7,481' MD. Displaced the well to 9.4 ppg brine. Flow check- Static. Pulling out of the hole on the trip tank to 5,860' MD at
4
0N/AMinimum
-27
0
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
12
Depth in / out WOBFootage
(current)
DepthUnits*
55
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
45.5
Cly
CaCl2
1651'
(mg/L)
20'2540'
6064'
cP
0
1
907-670-4047Unit Phone:
0
David McKechnie
Maximum 1424
Report By:Logging Engineers:David McKechnie/Tyler Dretke
Size
20.00''
2509'
114'
Set At
10.750
7.63''
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
.
.
*
24 hr Recap:
22 170 0-1-CT-G-X-I-NO-TD9.875 0.863 8.50 6403' 7672' 1269'
6403' 113'18 170 0-1-CT-S-X-I-NO-DTF6Msi 516 PDC 9.875 0.863 0.70
80 0-1-CT-G-X-I-NO-BHAFX65S9.875 0.863 15.50 6064'
4 FX65S 9.875 0.863
6.750
6290'
5
MSI 513 PDC
7 Msi 516 PDC
Size
20.00''
2509'
114'
Set At
10.750
7.63''
907-670-4047Unit Phone:
0
David McKechnie
Maximum 0
Report By:Logging Engineers:Tyler Dretke/David McKechnie
0
0
45.5
Cly
CaCl2
1651'
(mg/L)
20'2540'
6064'
cP
0
Casing
Summary
Lithology (%)
Surface Casing
C-2
Ss
(current)
DepthUnits*
Mud Data
TFA
in
Elec Stab
Bit #Bit Type
-
Depth in / out WOBFootage
Minimum
N/A0
0
tool. Rigged up to run 2-7/8" tubing. Running in the hole to 5,528' MD at report time.
0
0N/A
12956'
12956'
0'
Max @ ft Current
N/AN/A
Date:
N/A
L-80
Gvl
80.046.8
L-80
10
7662'
0.383
Mud TypeDepth
114'
2
C-5nC-1 C-3 C-4i
Yesterday's Depth:
Current Depth:
24 Hour Progress:
Conductor
57.20
94.0 H-40
120
0-1-CT-G-X-I-NO-BHA
900966759
-
-
RIH W/ 2-7/8" Completion
PV
Clyst Sh
Grade
80
C-5i
CementLst
Gas Summary
000
0 00
0
0.863 0.20 2520'
0
10
15
1873'8
Intermediate
5
C-4n
TuffCoal
Chromatograph (ppm)
Type
2540' 4413'
Weight
12956'
6290'
15.50 4413'
226'
9.875
Average
(max)
Trip
(max)(current)
Connection0BackgroundN/A
0 0 000
0
0
N/A 10,000 Units 100% Gas In Air=
-WBM
Condition
1-2-WT-A-E-1-RG-TD1
Silt
13.5
-
Mill Tooth
9.40
Size
28.50
Hours
--
0.739 2520'
Alpine Rig Activity:
N/A
Doyon 19 Report For:
Tools
-N/A
ROP
MWD Summary
24 hr MaxAvg
to-
N/A
Depth
-
ROP (ft/hr)
CD4-290
ConocoPhillips
North Slope, AK
Job No.:
Daily Charges:
Total Charges:
Avg Min
N/A
N/A
Morning Report Report # 31
Customer:
Well:
Area:
Location:
4.19 @
Rig:
Flow In (gpm)
Flow In (spm)
Time:
SPP (psi)
Gallons/stroke
16-Jan-2014
23:59
Current Pump & Flow Data:
N/A
Max
N/A
ECD
(ppg)
95%
D. Mickey / D. Lowe
40 2-3-BT-G-X-1/8-CT-DTF
5284'2-1-CT-G-X-I-NO-TD
Cht
7662'
PDC
Siltst
Density (ppg)
out (sec/qt)
Viscosity Cor Solids
%
API FL
-
YP Lime
-
v
RPM
ml/30min
-
lb/bbl
-
(lb/100ft2)
2406'
10 7672'
29.0
Comments
100 1-1-NO-A-X-1-NO-DTF3PDC9.875 0.863 11.90
Pulled out of the hole on the trip tank to surface, flow checking periodically- Static. Laid down liner hanger running
8 MSI 513 PDC 6.750 0.383 0.00 7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
9 MSI 513 PDC 6.750 0.383 0.00 7672' 7672' 0'0 0 0-1-FC-G-X-I-PN-DTF
WELL INFORMATION Created On : Jan 30 2014
Customer :ConocoPhillips
Well Name :CD4-290
Job Number :AK-XX-0900966759
Platform :Doyon 19
Field Name :Western North Slope
Country :USA
Survey Report
Survey dataSURVEY HEADER
Survey data provided by Schlumberger.
DIRECTIONAL SURVEY DATA
Tie-in
0.00 0.00 0.00 0.00 0.00 N 0.00 E
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
36.62 0.00 0.00 36.62 0.00 N 0.00 E 0.00 0.00
65.39 0.09 286.78 65.39 0.01 N 0.02 W 0.01 0.31
99.99 0.04 303.13 99.99 0.02 N 0.06 W 0.02 0.15
155.61 0.09 216.65 155.61 0.00 S 0.10 W 0.00 0.17
245.66 0.14 274.62 245.66 0.05 S 0.25 W -0.05 0.13
337.49 0.29 293.66 337.49 0.05 N 0.58 W 0.05 0.18
431.08 0.32 211.06 431.08 0.08 S 0.93 W -0.08 0.43
451.10 0.49 202.83 451.10 0.20 S 0.99 W -0.20 0.90
522.70 1.79 173.76 522.68 1.60 S 0.99 W -1.60 1.93
618.46 3.42 182.89 618.34 5.94 S 0.97 W -5.94 1.75
705.48 5.41 167.21 705.10 12.53 S 0.19 W -12.53 2.65
801.69 6.25 165.53 800.81 22.03 S 2.12 E -22.03 0.89
897.66 9.03 158.30 895.92 34.08 S 6.21 E -34.08 3.06
992.63 12.56 147.76 989.21 49.75 S 14.48 E -49.75 4.24
1087.21 13.40 145.34 1,081.37 67.46 S 26.20 E -67.46 1.06
1182.22 14.83 136.60 1,173.52 85.36 S 40.82 E -85.36 2.70
1276.13 15.25 127.46 1,264.23 101.60 S 58.88 E -101.60 2.56
1371.52 16.37 115.27 1,356.03 114.97 S 81.00 E -114.97 3.67
1465.83 18.49 109.02 1,446.01 125.52 S 107.16 E -125.52 3.00
1558.95 20.72 104.17 1,533.74 134.37 S 137.10 E -134.37 2.96
1653.47 23.26 99.86 1,621.38 141.66 S 171.71 E -141.66 3.18
1745.85 25.65 95.28 1,705.47 146.63 S 209.60 E -146.63 3.30
1806.43 26.25 91.60 1,759.95 148.21 S 236.05 E -148.21 2.84
1900.25 26.43 92.23 1,844.03 149.60 S 277.65 E -149.60 0.35
1994.68 26.50 92.24 1,928.56 151.24 S 319.70 E -151.24 0.07
2088.49 26.97 93.68 2,012.34 153.42 S 361.84 E -153.42 0.85
2183.53 27.88 93.67 2,096.70 156.23 S 405.53 E -156.23 0.96
2278.40 30.47 96.18 2,179.53 160.24 S 451.59 E -160.24 3.02
2369.82 31.09 97.04 2,258.07 165.63 S 498.06 E -165.63 0.83
2441.18 30.75 97.71 2,319.29 170.33 S 534.42 E -170.33 0.68
2540.12 30.52 96.76 2,404.42 176.68 S 584.44 E -176.68 0.54
INSITE V8.0.0 Page 1Job No:AK-XX-0900966759 Well Name:CD4-290 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
2549.66 30.62 96.93 2,412.64 177.26 S 589.25 E -177.26 1.39
2645.55 30.36 97.29 2,495.27 183.28 S 637.53 E -183.28 0.33
2739.20 30.20 96.45 2,576.14 188.93 S 684.41 E -188.93 0.48
2831.65 30.54 97.81 2,655.91 194.74 S 730.79 E -194.74 0.83
2926.61 30.40 97.48 2,737.75 201.14 S 778.51 E -201.14 0.23
3020.94 30.56 96.27 2,819.05 206.87 S 826.02 E -206.87 0.67
3114.77 30.57 94.24 2,899.84 211.24 S 873.52 E -211.24 1.10
3210.39 30.86 92.45 2,982.05 214.08 S 922.27 E -214.08 1.00
3302.63 30.94 90.38 3,061.20 215.25 S 969.62 E -215.25 1.16
3401.23 30.98 90.45 3,145.75 215.62 S 1,020.35 E -215.62 0.05
3499.82 30.83 91.95 3,230.35 216.68 S 1,070.97 E -216.68 0.80
3586.91 30.57 93.25 3,305.23 218.69 S 1,115.38 E -218.69 0.82
3680.84 30.20 93.04 3,386.26 221.30 S 1,162.82 E -221.30 0.41
3774.50 29.41 92.70 3,467.53 223.63 S 1,209.32 E -223.63 0.86
3868.73 29.17 92.87 3,549.71 225.87 S 1,255.36 E -225.87 0.27
3962.00 28.79 92.60 3,631.30 228.03 S 1,300.50 E -228.03 0.43
4056.90 30.34 94.33 3,713.85 230.88 S 1,347.23 E -230.88 1.86
4150.71 29.89 94.48 3,794.99 234.49 S 1,394.16 E -234.49 0.49
4247.14 29.81 94.74 3,878.63 238.35 S 1,442.00 E -238.35 0.16
4340.13 29.47 94.52 3,959.45 242.06 S 1,487.84 E -242.06 0.38
4433.63 29.24 94.19 4,040.95 245.54 S 1,533.54 E -245.54 0.30
4528.96 28.97 94.75 4,124.24 249.15 S 1,579.77 E -249.15 0.40
4619.14 29.68 94.65 4,202.86 252.77 S 1,623.79 E -252.77 0.79
4716.10 30.11 95.21 4,286.92 256.93 S 1,671.94 E -256.93 0.53
4810.62 29.57 94.09 4,368.91 260.74 S 1,718.81 E -260.74 0.82
4905.08 29.04 93.97 4,451.28 263.99 S 1,764.93 E -263.99 0.56
4999.57 30.01 95.09 4,533.50 267.68 S 1,811.35 E -267.68 1.18
5093.26 29.02 94.81 4,615.03 271.66 S 1,857.33 E -271.66 1.07
5188.50 29.20 98.42 4,698.25 277.00 S 1,903.33 E -277.00 1.85
5282.72 28.48 99.58 4,780.78 284.11 S 1,948.22 E -284.11 0.97
5376.61 29.32 99.59 4,862.98 291.66 S 1,992.96 E -291.66 0.89
5474.21 30.91 96.86 4,947.41 298.64 S 2,041.42 E -298.64 2.15
5564.25 31.24 96.91 5,024.53 304.21 S 2,087.56 E -304.21 0.37
5662.18 33.33 100.05 5,107.32 311.96 S 2,139.27 E -311.96 2.74
5753.31 34.55 100.84 5,182.92 321.19 S 2,189.30 E -321.19 1.42
5847.90 35.26 103.01 5,260.50 332.38 S 2,242.25 E -332.38 1.51
5941.78 35.91 108.47 5,336.86 347.21 S 2,294.78 E -347.21 3.45
6033.04 38.51 112.36 5,409.55 366.50 S 2,346.46 E -366.50 3.84
6128.78 39.78 113.74 5,483.80 390.17 S 2,402.06 E -390.17 1.61
6221.94 40.78 115.88 5,554.87 415.45 S 2,456.72 E -415.45 1.83
6320.05 42.85 123.37 5,628.04 447.81 S 2,513.45 E -447.81 5.51
6414.60 42.80 132.35 5,697.45 487.17 S 2,564.09 E -487.17 6.45
6508.32 45.75 137.07 5,764.56 533.22 S 2,610.50 E -533.22 4.72
6603.84 49.28 140.87 5,829.08 586.37 S 2,656.67 E -586.37 4.72
6698.06 53.31 143.32 5,887.99 644.40 S 2,701.79 E -644.40 4.73
INSITE V8.0.0 Page 2Job No:AK-XX-0900966759 Well Name:CD4-290 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
6793.35 58.02 146.18 5,941.73 708.66 S 2,747.14 E -708.66 5.53
6887.68 63.16 148.08 5,988.04 777.67 S 2,791.69 E -777.67 5.72
6982.12 66.88 148.90 6,027.91 850.64 S 2,836.42 E -850.64 4.02
7076.37 70.28 148.40 6,062.33 925.56 S 2,882.06 E -925.56 3.64
7170.57 70.90 145.63 6,093.64 1,000.07 S 2,930.43 E -1000.07 2.85
7265.70 71.70 142.95 6,124.14 1,073.23 S 2,983.02 E -1073.23 2.80
7358.78 74.64 144.21 6,151.09 1,144.91 S 3,035.91 E -1144.91 3.41
7453.08 77.71 147.10 6,173.63 1,220.51 S 3,087.54 E -1220.51 4.41
7547.23 80.02 149.60 6,191.81 1,299.14 S 3,136.00 E -1299.14 3.58
7610.72 81.54 151.30 6,201.98 1,353.65 S 3,166.90 E -1353.65 3.57
7660.64 83.33 151.34 6,208.56 1,397.07 S 3,190.65 E -1397.07 3.59
7756.93 86.29 151.67 6,217.27 1,481.33 S 3,236.40 E -1481.33 3.09
7854.59 88.21 150.85 6,221.95 1,566.86 S 3,283.30 E -1566.86 2.14
7943.23 88.83 150.58 6,224.24 1,644.15 S 3,326.64 E -1644.15 0.76
8038.05 89.00 150.45 6,226.04 1,726.67 S 3,373.30 E -1726.67 0.23
8134.35 88.79 151.02 6,227.89 1,810.66 S 3,420.37 E -1810.66 0.63
8229.01 88.95 151.75 6,229.76 1,893.74 S 3,465.70 E -1893.74 0.79
8323.33 90.78 151.79 6,229.98 1,976.84 S 3,510.31 E -1976.84 1.94
8418.90 91.20 153.40 6,228.33 2,061.67 S 3,554.29 E -2061.67 1.74
8514.48 90.47 154.60 6,226.94 2,147.57 S 3,596.18 E -2147.57 1.47
8610.30 90.00 155.73 6,226.55 2,234.52 S 3,636.43 E -2234.52 1.28
8704.97 89.93 156.54 6,226.60 2,321.10 S 3,674.73 E -2321.10 0.86
8800.76 89.93 156.64 6,226.72 2,409.00 S 3,712.79 E -2409.00 0.10
8896.44 90.48 157.47 6,226.38 2,497.11 S 3,750.09 E -2497.11 1.04
8990.50 90.85 157.78 6,225.29 2,584.08 S 3,785.89 E -2584.08 0.51
9086.20 90.58 158.57 6,224.09 2,672.92 S 3,821.47 E -2672.92 0.87
9181.96 90.34 159.14 6,223.32 2,762.22 S 3,856.01 E -2762.23 0.65
9277.50 90.44 159.04 6,222.67 2,851.47 S 3,890.11 E -2851.47 0.15
9372.87 90.13 158.49 6,222.20 2,940.36 S 3,924.65 E -2940.36 0.66
9468.80 89.89 157.04 6,222.18 3,029.16 S 3,960.95 E -3029.16 1.53
9563.70 89.65 156.74 6,222.56 3,116.44 S 3,998.19 E -3116.44 0.40
9659.65 89.14 154.65 6,223.58 3,203.88 S 4,037.68 E -3203.88 2.24
9755.54 88.76 152.52 6,225.33 3,289.74 S 4,080.33 E -3289.74 2.26
9849.37 89.31 152.62 6,226.91 3,373.01 S 4,123.55 E -3373.01 0.60
9943.93 89.38 152.05 6,227.99 3,456.75 S 4,167.45 E -3456.75 0.61
10039.99 88.69 151.05 6,229.61 3,541.19 S 4,213.21 E -3541.20 1.26
10134.68 88.97 150.40 6,231.55 3,623.77 S 4,259.50 E -3623.77 0.75
10229.41 88.73 150.96 6,233.45 3,706.35 S 4,305.88 E -3706.35 0.64
10326.37 88.69 151.53 6,235.63 3,791.33 S 4,352.51 E -3791.33 0.59
10422.00 88.38 152.70 6,238.08 3,875.83 S 4,397.22 E -3875.83 1.27
10517.86 88.14 154.97 6,240.99 3,961.82 S 4,439.47 E -3961.82 2.38
10612.30 88.97 155.07 6,243.37 4,047.40 S 4,479.34 E -4047.40 0.89
10707.92 90.83 154.90 6,243.53 4,134.05 S 4,519.77 E -4134.05 1.95
10803.81 90.37 155.18 6,242.53 4,220.97 S 4,560.23 E -4220.98 0.56
10898.89 90.41 154.45 6,241.88 4,307.01 S 4,600.69 E -4307.01 0.77
INSITE V8.0.0 Page 3Job No:AK-XX-0900966759 Well Name:CD4-290 Survey Report
DIRECTIONAL SURVEY DATA
(ft)
Measured Depth DoglegVertical SectionDeparture
(ft)
Latitude
(ft)
Vertical Depth
(deg)
DirectionInclination
(deg)(ft)(ft)(°/100')
10995.09 90.44 154.78 6,241.17 4,393.92 S 4,641.93 E -4393.92 0.34
11089.43 90.54 155.54 6,240.36 4,479.53 S 4,681.56 E -4479.53 0.81
11188.19 90.58 155.39 6,239.40 4,569.37 S 4,722.57 E -4569.37 0.16
11278.57 91.09 155.76 6,238.08 4,651.65 S 4,759.94 E -4651.65 0.70
11375.90 90.58 155.67 6,236.66 4,740.36 S 4,799.96 E -4740.36 0.53
11471.33 90.74 156.29 6,235.56 4,827.52 S 4,838.80 E -4827.52 0.67
11566.45 92.30 156.39 6,233.04 4,914.61 S 4,876.96 E -4914.61 1.64
11662.55 92.14 155.50 6,229.32 5,002.30 S 4,916.10 E -5002.30 0.94
11756.63 88.62 156.84 6,228.69 5,088.34 S 4,954.11 E -5088.34 4.00
11851.77 89.48 156.78 6,230.27 5,175.78 S 4,991.56 E -5175.78 0.91
11947.34 89.45 157.74 6,231.16 5,263.92 S 5,028.51 E -5263.92 1.00
12043.41 89.14 155.97 6,232.35 5,352.24 S 5,066.26 E -5352.24 1.87
12137.12 89.34 153.64 6,233.59 5,437.02 S 5,106.15 E -5437.03 2.50
12232.62 90.03 151.14 6,234.11 5,521.64 S 5,150.40 E -5521.64 2.72
12325.89 89.58 150.11 6,234.43 5,602.92 S 5,196.15 E -5602.92 1.21
12421.16 90.34 147.27 6,234.50 5,684.30 S 5,245.66 E -5684.30 3.09
12515.52 90.86 148.22 6,233.51 5,764.10 S 5,296.01 E -5764.10 1.15
12604.85 89.47 150.20 6,233.25 5,840.83 S 5,341.74 E -5840.83 2.71
12701.92 90.10 151.53 6,233.62 5,925.61 S 5,388.99 E -5925.62 1.52
12799.14 89.48 153.38 6,233.97 6,011.81 S 5,433.95 E -6011.81 2.01
12893.87 89.34 153.92 6,234.95 6,096.69 S 5,476.00 E -6096.69 0.59
12955.00 89.34 153.92 6,235.65 6,151.59 S 5,502.87 E -6151.60 0.00
DIRECTIONAL SURVEY DATA NOTES
- Calculation based on minimum curvature method.
- Survey coordinates relative to well system reference point.
- TVD values given relative to drilling measurement point.
- Vertical section relative to well head.
- Vertical section is computed along a direction of 0.00 degrees (Grid)
- A total correction of 18.32 deg from Magnetic north to Grid north has been applied
- Horizontal displacement is relative to the well head.
- Horizontal displacement (closure) at 12,955.00 feet is 8,253.71 feet along 138.19 degrees (Grid)
INSITE V8.0.0 Page 4Job No:AK-XX-0900966759 Well Name:CD4-290 Survey Report
WARRANTY
HALLIBURTON ENERGY SERVICES, INC. WILL USE ITS BEST EFFORTS TO FURNISH CUSTOMERS WITH ACCURATE INFORMATION
AND INTERPRETATIONS THAT ARE PART OF, AND INCIDENT TO, THE SERVICES PROVIDED. HOWEVER, HALLIBURTON ENERGY
SERVICES, INC. CANNOT AND DOES NOT WARRANT THE ACCURACY OR CORRECTNESS OF SUCH INFORMATION AND
INTERPRETATIONS. UNDER NO CIRCUMSTANCES SHOULD ANY SUCH INFORMATION OR INTERPRETATION BE RELIED UPON AS
THE SOLE BASIS FOR ANY DRILLING, COMPLETION, PRODUCTION, OR FINANCIAL DECISION OR ANY PROCEDURE INVOLVING ANY
RISK TO THE SAFETY OF ANY DRILLING VENTURE, DRILLING RIG OR ITS CREW OR ANY THIRD PARTY. THE CUSTOMER HAS FULL
RESPONSIBILITY FOR ALL DRILLING, COMPLETION, AND PRODUCTION OPERATION. HALLIBURTON ENERGY SERVICES, INC.
MAKES NO REPRESENTATIONS OR WARRANTIES, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE
IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, WITH RESPECT TO THE SERVICES
RENDERED. IN NO EVENT WILL HALLIBURTON ENERGY SERVICES, INC. SERVICES BE LIABLE FOR FAILURE TO OBTAIN ANY
PARTICULAR RESULTS OR FOR ANY DAMAGES, INCLUDING, BUT NOT LIMITED TO, INDIRECT, SPECIAL OR CONSEQUENTIAL
DAMAGES, RESULTING FROM THE USE OF ANY INFORMATION OR INTERPRETATION PROVIDED BY HALLIBURTON ENERGY
SERVICES, INC.
INSITE V8.0.0 Page 5Job No:AK-XX-0900966759 Well Name:CD4-290 Survey Report