Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout212-120 STATE OF ALASKA LASKA OIL AND GAS CONSERVATION COMMI N ' WELL OMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned Q • Suspended 0 lb.Well Class: 20AAC 25.105 20AAC 25.110 Development RI Exploratory 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 No.of Completions: Zero • Service ❑ Stratigraphic Test 0 2. Operator Name: 6. Date Comp.,Susp.,or Aband.: 14.Permit to Drill Number/Sundry BP Exploration(Alaska),Inc 1/1/2016 • 212-120 • 315-688 3. Address: 7. Date Spudded: 15' API Number: P.O.Box 196612 Anchorage,AK 99519-6612 11/26/2012 50-029-20576-02-00 • 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16. Well Name and Number 11/28/2012 PBU E-20B • Surface: 1743'FNL,883'FEL,Sec.06,T11N,R14E,UM • 9 KB Ref Elevations 17. Field/Pool(s): 59.11 • 3598'FNL,1064'FWL,Sec.05,T11 N,R14E,UM GL 30.36 - PRUDHOE BAY,PRUDHOE OIL • Top of Productive Interval: BF 33.49 - Total Depth: 3251'FNL,1086'FWL,Sec.05,T11N,R14E,UM 10. Plug Back Depth(MD/TVD): 18. Property Designation: • 10017'/8917' • ADL 028304 • 4b. 4b.Location of Well(State Base Plane Coordinates,NAD 27): 11. Total Depth(MD/TVD): 19. Land Use Permit: Surface:x- 664103• y- 5975313 • Zone - ASP 4 • 10781'/9069' • 89-111 TPI: x- 666096 y- 5973501 Zone - ASP 4 12. SSSV Depth(MD/TVD): PO Thickness of Permafrost MD/TVD: Total Depth:x- 666109 y- 5973848 Zone - ASP 4 None 1900'(Approx.) 5. Directional or Inclination Survey: Yes ❑ (attached) No lI 13. Water Depth.if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 MC 25.050 N/A (ft MSL) 9530'/8593' 22. Logs Obtained List all logs run and,pursuant to AS 31.05.030 and 20 AAC 25.071,submit all electronic data and printed logs within 90 days of completion, suspension,or abandonment,whichever occurs first.Types of logs to be listed include,but are not limited to:mud log,spontaneous potential,gamma ray,caliper, resistivity,porosity,magnetic resonance,dipmeter,formation tester,temperature,cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary MWD/GR/RES,GR/CCL 23. CASING,LINER AND CEMENTING RECORD CASING WT.PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTINGRECORD AMOUNT FT. PULLED TOP BOTTOM TOP BOTTOM 20"x 30" Insulated Conductor 30' 110' 30' 110' 36" 8 cu yds Concrete 13-3/8" 72# L-80 30' 2699' 30' 2699' 17-1/2" 2627 cu ft Arctic Set II 9-5/8" 40#/47# L-80 29' 8767' 29' 7907' 12-1/4" 1292 cu ft Class'G',130 cu ft AS I,581 sx Class'G' 7" 26# L-80 3462' 9425' 3446' 8493' 8-1/2" 213 cu ft Class'G',466 cu ft Class'G',163 cu ft Class'G' 4-1/2" 12.6# L-80 9266' 9530' 8349' 8593' 6-1/8" 162 cu ft Class'G' 3-1/2"x 3-1/4" 9.3#/6.6# L-80 9151' 10781' 8245' x2-7/8" /6.6# 9069' 4-1/8" 66sxClass'G' 24. Open to production or injection? Yes 0 No EI 25. TUBING RECORD If Yes,list each interval open(MD/TVD of Top and Bottom;Perforation GRADE DEPTH SET(MD) PACKER SET(MD/TV Size and Number): 4-1/2",12.6#,13Cr85/'3Cr80 9275' 9051'/8155' SCANNED 9218'/8305' ��N,„24,2016 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. Was hydraulic fracturing used during completion? Yes 0 No lI • E C E I M/E Per 20 MC 25.283(i)(2)attach electronic and printed information JAN 2 8 2016 DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED 10017' Set Whipstock AOGCC 27. PRODUCTION TEST Date First Production: Not on Production Method of Operation(Flowing,gas lift,etc.):N/A Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: Gas-Oil Ratio: Test Period �► Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API(corr): Press 24 Hour Rate ' `1 Form 10-407 Revised 11/2015 CONTINUED ON PAGE 2 Submit ORIGINAL only l?L 5 /.3lj Ot r(i(4 -"'BONS LL-JAN 2 9 2016 - s- .i6. /9 28. CORE DATA • Conventional Core(s) Yes 0 No Ivj Sidewall Cores Yes 0 No 0 If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil.gas or water ' (submit separate sheets with this form,if needed).Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS(List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Permafrost-Top Well Tested? Yes LI No RI • Permafrost-Base If yes,list intervals and formations tested.briefly summarizing test results.Attach Top of Productive Interval 10410' 8954 separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit-Zone 4 9549' 8612' CGL-Zone 3 9667' 8727' Base of CGL-Zone 2C 9715' 8772' 22TS-Zone 2B 9764' 8816' 21TS-Zone 2A 9837' 8869' Zone 1B 10410' 8954' TDF-Zone 1A 10622' 9005' Base of Sadlerochit 10730' 9047' Formation at total depth: 31. List of Attachments: Summary of Pre-Rig Work,Summary of Daily Drilling Reports,Well Schematic Diagram Information to be attached includes,but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey,core analysis,paleontological report,production or well test results,per 20 AAC 25.070. 32.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Browning,Zachary H Email: Zachary.Browning©bp.com Printed Name: Joe Lastuf Title: Drilling Technologist Signature: L41/4Phone: +1 907 564 4091 Date: I/21/1V INSTRUCTIONS General:This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska.Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC.no matter when the analyses are conducted. Item la. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated.Each segregated pool is a completion. Item lb.Well Class Service wells:Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disp,Water Supply for Injection.Observation or Other. Item 4b.TPI(Top of Producing Interval). Item 9. The Kelly Bushing and Ground Level elevations in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15.The API number reported to AOGCC must be 14 digits(ex:50-029-20123-00-00). Item 20. Report true vertical thickness of permafrost in Box 20.Provide MD and TVD for the top and base of permafrost in Box 29. Item 22. Review the reporting requirements of 20 AAC 25.071 and,pursuant to AS 31.05.030,submit all electronic data and printed logs within 90 days of completion,suspension,or abandonment,whichever occurs first. Item 23.Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24.If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26.(Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27.Method of Operation:Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-in,or Other(explain). Item 28.Provide a listing of intervals cored and the corresponding formations,and a brief description in this box.Submit detailed description and analytical laboratory information required by 20 AAC 25.071. Item 30.Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box.Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31.Pursuant to 20 AAC 25.070.attach to this form:well schematic diagram,summary of daily well operations.directional or inclination survey,and other tests as required including,but not limited to:core analysis,paleontological report.production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only • • E-20B, Well History (Pre-Rig Sidetrack) DAT : '3V171"17'.. CTU #8 - 1.5" CT(CV 18.7bb1). Job Objective: Dummy WS Drift. MIRU CTU. MU BOT MHA, 2.70" 11/16/2015 Dummy WS Drift- Pump 5 bbl spear 60/40 Meth start pumping slick 1% KCL w/SL-Start RIH. CTU #8 - 1.5" CT (CV 18.7bb1). Job Objective: Dummy WS Drift. RIH w/2.70" Dummy WS Drift while pumping slick 1% KCL w/SL-Stop at 10,300' (Planned TOWS at 10,020') - POOH - FP well 11/17/2015 38 bbls 60/40 Meth - BD BOT Dummy WS Drift BHA- RDMO to K-19. T/I/O=0/137/NA Assist SL as directed (CTD) Pumped 5 bbls methanol followed by 136 bbls of 11/21/2015 crude down TBG to secure well. LRS LOAD TUBING W/ 180 BBL's CRUDE. TAG DEPLOY SLV @ 9132' SLM/9151' MD, BRUSH X-NIPPLE @ 9066' SLM/9088' W/4-1/2" BRUSH. SET 4-1/2"XX PLUG W/ FILL EXT (4x 1/8"eq ports, 4x 3/16" eq ports oal=43), @ 9070' SLM/9088' MD. LRS PERFORM PASSING MIT-T TO 2500psi. PULLED BK-DGLV FROM STA#1 @ 6528' SLM/6542' MD. SET CK-CIRC IN STA#1 @ 6528' SLM/6542' MD. LRS CIRC'ED OUT IA WITH 410 BBLS OF DIESEL. MAKE TWO LIB RUNS 11/22/2015 TO STA# 1 (inconclusive). MIT-T to 2500 psi Test#1 ***PASSED*** Pumped an additional 49 bbls of 110*crude down TBG to load for SL. SL set plug. Pumped 3 bbls of crude down TBG to reach test pressure. 1st 15 minutes TBG lost 79 psi, 2nd 15 minutes TBG lost 37 psi, for a total of 116 psi. Bled back —2 bbls. Pumped 5 bbls meth followed by 410 bbls DSL down IA taking returns up TBG out FL to circ out well. 11/22/2015 Pumped 10 bbls meth and 32 bbls crude down FL for FP, WOA formula. PULLED STA#1 BK-CIRC FROM 6528' SLM/6542' MD. SET BK-OGLV IN STA#1 @ 6528' SLM/6542' MD. PULLED BK-DGLV FROM STA#2 @ 3627' SLM/3644' MD. SET BK-LGLV IN STA 11/23/2015 #2 © 3627' SLM/3644' MD. MIT-T***FAILED*** Pumped 2.2 bbls DSL to assist SL with GLV set. Pumped 7 bbls DSL down 11/23/2015 TBG to achieve test pressure of 2500 psi. 7 attempts. MIT-T to 2500 psi ***FAILED*** CMIT TxIA to 2500 psi ***FAILED*** Pumped 14 bbls of Ambient 11/24/2015 diesel down TBG and IA in attempt MIT-T and CMIT. SET 4-1/2"X-SELECTIVE TEST TOOL IN X-NIP @ 9009' SLM/9025' MD. LRS TO ATTEMPT CMIT (fail). SET 4-1/2"X-SELECTIVE TEST TOOL IN X-NIP @ 2088' SLM/2128' MD. LRS PERFORMED FAILING MIT-T. PULL 4-1/2"X-SELECTIVE TEST TOOL FROM X-NIP @ 2088' 11/24/2015 SLM/2128' MD. SET 4-1/2" PX PLUG BODY(w/6-1/8" eq ports, 26" oal) @ 9009' SLM/9025' MD. SET P-PRONG ( f.n.=1.75", max od=1.75", oal= 97") IN PLUG BODY, @ 9003' SLM. LRS PREFORM PASSING MIT-T TO 2500psi. PULLED P-PRONG FROM PX PLUG BODY @ 9,003' SLM PULLED4-1/2" PX PLUG BODY FROM 9,009' SLM/9,025' MD. PULLED 4-1/2"XX-PLUG FROM X- 11/25/2015 NIP @ 9,070' SLM/9,088' MD. MIT-T to 2500 psi ***PASSED*** Pumped 3 bbls of ambient diesel down TBG to reach test pressure. 1st 15 min TBG lost 77 psi, 2nd 15 min TBG lost 31 psi. Total loss of 108 psi. AFE sign and tags hung on MV. DSO notified of well status. Slickline in control of well upon LRS departure. 11/25/2015 FWHP=1500/153/na. T/I = 340/160. Set 4" H TWC#427 . @100"W/2' Ext. Installed TS#05 and XO#02 W/Tree Cap. 12/17/2015 Torqued and PT'd to API specs. (PASS). RDMO. FWHP = TWC/160. T/I = TWC/87. Temp = SI. Bleed IAP to 0 psi (pre RIG). No OA(mono bore). No AL or flow line connected, No well house. IA FL @ surface. Bled IAP to bleed trailer from 87 psi to 0 psi in 10 min (all fluid). Held bleed open on OA for 30 min. SI bleed, monitored for 30 min, IAP unchanged. 12/18/2015 FWHPs = TWC/0. SV= C. WV= C/blind. MV= O. IA= OTG. 0900. T/I = TWC/0. Temp = SI. WHPs (post bleed). No OA (mono bore). No flow line. No well house. Blind installed on WV. Two way check installed. IAP unchanged in 24 hours. SV,WV,SSV= C. MV 12/19/2015 = O. Al = OTG. 1100. T/I = TWC/0. Temp = SI. WHPs (Post bleed pre Rig). No WH or flowlines. WHPs unchanged 12/20/2015 overnight. SV, WV, SSV, MV= C. IA= OTG. 13:00. • • E-20B, Well History (Pre-Rig Sidetrack) T/I = TWCNac. Temp = SI. WHPs (Pre RIG). Wel!house &flowline removed. SV, WV, SSV, MV= 12/22/2015 C. IA= OTG. 1130 hrs. • • • North America-ALASKA-BP�'� Page 1 az, •perat on Summary Report "` Common Well Name:E-20 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/30/2015 End Date:1/4/2016 X3-017KD-C:(2,808.451.90) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292057600 Active datum:28.50+30.61 GL©59.11 usft(above Mean Sea Level) Date From-To Hrs Task Code 1 NPT NPT Depth Phase Description of Operations (hr) (usft) 12/30/2015 03:00 04:30 1.50 MOB P PRE JACKUP RIG AND ROLL OFF F-45C !-PJSM TO MOVE RIG OFF WELL WSL,NORDIC SUPT.AND NORDIC 'TOOLPUSHER PRESENT -NOTIFIED PAD OPERATOR OF MOVING OFF WELL 04:30 - 05:30 1.00 MOB P PRE MOVE RIG AROUND TO F PAD MANIFOLD BUILDING. STAGE RIG FOR CREW CHANGE. SECURITY ARRIVED AT 04:30-HRS. 05:30 - 06:00 0.50 MOB P PRE CREW CHANGE AND PJSM FOR RIG MOVE WITH DAY CREW. 06:00 - 10:00 4.00 MOB P PRE RIG MOVE.TOE PAD. 10:00 - 12:00 2.00 MOB P PRE SPOT RIG OVER WELL SPOT T MATS AROUND WELL -VERIFIED I/A IS LESS THAN 50-PSI -THIS WELL HAS NO 0/A HELD PJSM TO SPOT RIG OVER WELL -WHEEL CHOCKS WILL BE PLACED BEHIND RIG WHEELS TO PREVENT ROLLBACK -ESD SYSTEM TESTED BEFORE MOVING OVER WELL AND WILL BE MANNED BY TOOLPUSHER -COMMAND FOR STOP THE JOB AGREED BY ALL -SPOT RIG OVER WELL **ACCEPTED RIG AT 11:30-HRS.** 12:00 - 13:00 1.00 BOPSUR P PRE COMMENCE RIGUP ENCLOSED CELLAR -SPOTTED CUTTINGS TANK -CYCLED TREE VALVES****CTS SSV CONTROL PANEL USED TO OPEN SSV**** -LOCKED OPEN SSV WITH FUSIBLE CAP -LEAK TIGHT TESTED MANUAL MASTER AND SWAB VALVES -GOOD TEST 13:00 - 17:00 4.00 BOPSUR P PRE N/U BOPE -N/D TREE CAP FLANGE TO SWAB VALVE -N/U 7-1/16"BOPE STACK TO SWAB VALVE FLANGE. -SECURE STACK -INSTALL HOT TUB -INSTALL LUBRICATOR -SEAL HOT TUB AND INSTALL HOT TUB GRATING -OBTAIN RKB'S 17:00 - 17:30 0.50 BOPSUR P 1 PRE CONDUCT H2S RIG ABANDONMENT DRILL. -GOOD AAR,ALL HANDS MUSTERED,DRILL SITE OPERATOR NOTIFIED. 1 - TIME TO MUSTER APROXIMATELY 3 MINUTES -CONDUCT AAR TO CAPTURE LEARNINGS Printed 1/11/2016 9:04:09AM yi • • North America ALASKA BP Page 2 c%2o Operation SummaryReport y r " r r Common Well Name E-20 AFE No Event Type RE-ENTER-ONSHORE(RON) Start Date:12/30/2015 End Date:1/4/2016 X3-017KD-C:(2,808,451.90) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 1 I Spud Date/Time:11/27/1981 12:00:00AM 'Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292057600 Active datum:28.50+30.61 GL @59.11 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 17:30 - 00:00 6.50 BOPSUR P PRE PJSM.PERFORM SHELL TEST ON BOPE,250 PSI/4500 PSI,5 MIN EACH,GOOD TEST. -PRESSURE TEST ALL BOP EQUIPMENT AS PER AOGCC REGS,PTD#215-200,AND CRT-AK-10-45 -TEST BOPE TO 250/3500 PSI FOR 5 CHARTED MIN EACH. TEST CHOKE VALVES,CHOKE AND KILL HCR 1 VALVES,INSIDE MANUAL VALVES ON CHOKE AND KILL LINES,BOP RAMS AND ANNULAR PREVENTER(3500 PSI) 1 -ALL VARIABLE PIPE RAMS TESTED WITH 2"- 1 2-3/8"TEST JOINT 1 -2"PIPE RAMS TESTED WITH 2"TEST JOINT -BLIND RAMS TESTED ON.OPEN HOLE AGAINST TEST PLUG,. 12/31/2015 00:00 - 03:00 3.00 BOPSUR P PRE -ANNULAR TESTED WITH BOTH 2"AND 2-3/8" TEST JOINT -TEST FULL OPENING SAFETY VALVE -ALL TESTS ON ALL RAMS AND VALVES,250/ 3500 PSI/5 MIN EACH/CHARTED. -PERFORM ACCUMULATOR DRAW DOWN TEST. FUNCTION BOP FROM BOTH REMOTE PANELS -TEST GAS ALARMS -ALL TEST WITNESSED BY DRILLER,RIG MANAGER OR BP WSL -AOGCC INSPECTOR JOHNNIE HILL WAIVED THE STATES RIGHT TO WITNESS THE TEST. 24 HOUR NOTIFICATION GIVEN TO THE AOGCC ON 12/29/2015 @ 14:58 HRS. 03:00 - 04:30 1.50 BOPSUR P` PRE PJSM.MAKE UP INJECTOR TO WELL,FLUID PACK. -LINE UP TO PRESSURE TEST PACK OFF TO CHOKE. -VERIFY LINE UP AND PERFORM 4700 PSI LEAK TIGHT TEST ON SYSTEM. -TESTED STANDING IRON,HP FILTERS,PACK OFF,COIL ALL THE WAY TO THE RIG CHOKE. 04 30 - 05:00 0.50 BOPSUR P PRE CONDUCT H2S RIG ABANDONMENT DRILL, DRILL SITE OPERATOR NOTIFIED. -GOOD AAR AT THE MUSTER AREA.TIME TO MUSTER APPROXIMATELY 3 MINUTES. -GOOD HEAD COUNT,REVIEWED 'PROCEDURE. 05:00 - 06:45 1.75 BOPSUR P PRE CREW CHANGE. PJSM. PREPARE TO PUMP SLACK IN COIL. -PUMP SLACK,CUT COIL AND M/U COIL CONNECTOR. 06:45 - 07:00 0.25 BOPSUR P PRE PUMP SLACK IN E-LINE BACK TO REEL -CUT OFF EXCESS E-LINE -PICK UP AND STAB INJECTOR i -P/T QTS -PUMP SLACK BACK TO COIL @ 2.64-BBLS./MIN.@ 4,250-PSI -CHECK FOR TRAPPED PRESSURE-NONE OBSERVED -UNSTAB INJECTOR Printed 1/11/2016 9.04.09AM • North America ALASKA BP Page 3 o0- Operation Summary Report Common Well Name E-20 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/30/2015 End Date 1/4/2016 X3-017KD-C:(2,808.451.90) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI.500292057600 Active datum:28.50+30.61 GL @59.11 usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 07:00 - 07:45 0.75 j BOPSUR P PRE COIL MANAGEMENT -HOLD PJSM AND RIG UP HYDRAULIC CUTTER CUT 288'COIL -PJSM WITH GREASE CREW -CHECK TORQUE ON TREE BOLTS 07:45 - 08:30 0.75 BOPSUR P PRE PREP COIL FOR INTERNAL CTC MEG TEST E-LINE-GOOD TEST MAKE UP INTERNAL CTC PULL TEST TO 35K -PT CTC -GOOD TEST 08:30 - 09:15 0.75 BOPSUR P PRE MAKE UP BAKER UQC -PT BHI UQC GOOD TEST 09:15 - 10:00 0.75 BOPSUR P PRE PRESSURE TEST BAKER UQC CHECK VALVES 10:00 - 10:15 0.25 BOPSUR P PRE LOAD LUBRICATOR TO RIG FLOOR -HELD PJSM WITH VALVE SHOP CREW TO PULL TWC 10:15 - 11:45 1.50 BOPSUR P PRE MADE UP LUBRICATOR TO RISER -TESTED LUBRICATOR TO 250-PSI LO/ 3700-PSI HI GOOD TEST -ENGAGE TWC -290-PSI UNDER TWC -PULL TWC AND TAG UP -SHUT IN SWAB VALVE -OBSERVE GOOD LTT -BLED OFF PRESSURE -LAY DOWN LUBRICATOR AND TWC 11 45 - 12:15 0.50 BOPSUR P PRE HELD PJSM TO MAKE UP NOZZLE BHA MADE UP NOZZLE BHA -STAB INJECTOR -NOZZLE DEPTH ABOVE ANNULAR PREVENTER 12:15 - 12:45 0.50 BOPSUR P PRE SPOT AND HOOK UP VAC TRUCKS AND MEOH PUP 12:45 - 13:15 0.50 BOPSUR P PRE PSJM TO BULLHEAD KILL WELL Printed 1/11/2016 9.04.09AM • • %;,410-2mAtutl:10#!;10:, Page 4 Gait Operation Summary Report Common Well Name.E-20 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date.12/30/2015 End Date:1/4/2016 X3-017KD-C:(2,808,451.90) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UW:500292057600 Active datum:28.50+30.61 GL @59.11usft(above Mean Sea Level) Date From-To Hrs Task Code NPT [ NPT Depth Phase Description of Operations (hr) (usft) 13:15 - 15:00 1.75 BOPSUR P PRE STAB INJECTOR -PT QTS BULLHEAD KILL WELL -SITP=270-PSI -PUMP 5.0-BBLS NEAT MEOH AT 510-PSI AT 2,63-BPM --PUMP 278-BBLS.OF 1%KCL BRINE AT 5.0-BPM -45-BBLS AWAY-1855-PSI -50-aBLS AWAY-1475-PSI -100-I3BLS AWAY-1261-PSI -150-BBLS AWAY-1447-PSI -200-BBLS AWAY-2114-PSI -250-BBLS AWAY-2141-PSI -278-BBLS AWAY-2155-PSI IA PREESURE ROSE TO 945-PSI. BLED OFF 1/2-BBL.TO TIGER TANK PUMPS DOWN AT 13:15-HRS. FLOW CHECK WELL FOR 10-MINUTES WELL IS ON VACUUM -FILL HOLE TO ESTABLISH LOSS RATE -LOSS RATE=48-BPH 1500 - 15 15 0.25 BOPSUR P PRE PJSM-UNSTAB INJECTOR,LAY DOWN NOZZLE BHA#1 AND LOAD BAKER WHIPSTOCK TOOLS TO RIG FLOOR 15:15 - 15:30 0.25 BOPSUR P PRE LAY DOVVN NOZZLE BHA#1 UNSTAB INJECTOR -BREAK OUT AND LAY DOWN NOZZLE BHA -SET INJECTOR BACK -CIRCULATE THROUGH COIL 15:30 - 15:45 0.25 WHIP P WEXIT LOAD BAKER VVHIPSTOCK AND TOOLS TO RIG FLOOR -PJSM TO MAKE UP WHIPSTOCK BHA#2 15:45 - 16:15 0.50 WHIP P WEXIT MAKE UP VVHIPSTOCK BHA#2 _ STAB INJECTOR -PT QTS -OPEN EDC 16:15 - 20:00 3.75 WHIP P WEXIT RIH WITH BAKER 3-3/16"PACKER WHIPSTOCK -PUMPING.3 BPM TO.5 BPM PER BAKER REP AND WELL PLAN -TAKING RETURNS TO TIGER TANK -LOG TIE IN @ 9480',MINUS 9'CORRECTION. -TIE IN FOR CCL,9950'-10,150', CORRELATED WITH LOG IN PROGRAM. 20:00 - 20:30 0.50 WHIP P WEXIT POSITION TOP OF WHIPSTOCK Gt 10,020'. PICK UP TO UP WT. -CLOSE EDC AND PRESSURE UP,SET WHIPSTOCK @ 2600 PSI. -SET DOWN 4K TO CONFIRM WHIPSTOCK SET,OK -PICK UP 10'AND CLOSE IN WELL. PRESSURE UP TO 2400 PSI F/10 MINUTES. -PRESSURE HELD INDICATING PACKER SET OK BLEED OFF ALL PRESSURE. 20:30 - 21.30 1.00 WHIP P WEXIT PJSM.DISPLACE OUT THE 1%KCL W/9.5 PPG FLO PRO/POWER PRO MIX. -2 BPM/3700 PSI.PUMPING FROM TRUCK TAKING RETURNS TO TIGER TANK Printed 1/11/2016 9:04 09AM .. i •f . North Atli" n ALAS Operation Summary Report Common Well Name.E-20 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/30/2015 End Date:1/4/2016 X3-017KD-C:(2,808,451.90) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292057600 Active datum.28.50+30.61 GL©59.11usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (usft) 21:30 - 23:30 2.00 WHIP P WEXIT PJSM.FLOW CHECK,POOH W/WHIPSTOCK SETTING TOOL. -FLOW CHECK AT SURFACE,WELL STATIC, 9.5 PPG MUD IN AND OUT. 23:30 - 00:00 0.50 WHIP P ■ WEXIT PJSM.BREAK OFF INJECTOR. -LAY DOWN WHIPSTOCK SETTING ASSEMBLY. 1/1/2016 00:00 - 00:45 1 0.75 STWHIP P WEXIT PJSM.CONTINUE TO MAKE UP WINDOW MILLING ASSEMBLY. -FLOW CHECK WELL,WELL STATIC,9.5 PPG IN AND OUT. -MAKE UP INJECTOR TO WELL.TEST QUICK SUB,250/3500 PSI,5 MIN EACH. 00:45 - 02:30 1.75 STWHIP P WEXIT PJSM.RIH W/WINDOW MILLING BHA. -NO LOSSES DURING TRIP IN. 02:30 - 05:30 3.00 STWHIP P WEXIT TIE IN LOG 9547'.SUBTRACT 5' CORRECTION. -GAMMA LOG DOWN FROM 9515'-9947"© 200'/HR. 5._I�,ZQC 05:30 - 06:00 0.50 STWHIP P WEXIT' COMMENCE WINDOW MILLING OPERATIONS ✓�0✓1i�G @ 10,017.5'. 06:00 - 08:45 2.75 STWHIP P WEXI1 ' 10020'MD AT 08:45-HRS. -FREE SPIN=2850-PSI MM IN=1.62-BPM MM OUT=1.54-BPM ROP=0.9 FPH WOB=1.16K CIRC PSI=2850 MW IN=9.46-PPG MW OUT=9.41-PPG ECD =10.24-PPG IAP=315-PSI BLED DOWN TO 0-PSI PVT= 339 BBLS 08:45 - 12:30 3.75 STWHIP P WEXIT CONTINUE MILLING WINDOW FROM 10020' MD TO 10032'MD FREE SPIN=2850-PSI MM IN=1.62-BPM MM OUT=1.54-BPM ROP=0.9 to 8 FPH WOB=1.16-2K CIRC PSI =2850-3359 MW IN=9.46-PPG MW OUT=9.41-PPG ECD =10.24-PPG IAP= 0-PSI PVT=339 BBLS 12:30 - 13:30 1.00 STWHIP P WEXIT DRESS WINDOW -REAM UP AND DOWN THROUGH WINDOW FROM 10032'TO 10014'x 3 -DRY DRIFTED WINDOW -ALL REAM PASSES AND DRY DRIFT WERE CLEAN -OPENED EDC ABOVE WINDOW -PUMPED 10-BBL.HIGH VIS PILL 1330 - 16:00 2.50 STWHIP P WEXIT POH WITH WINDOW MILL BHA#3 -PUMPING 2.3-BPM AT 3400-PSI CIRC PSI -PULLING SPEED 78 FPM -BUMP UP -FLOW CHECK 10 MINUTES 16:00 - 16:20 0.33 STWHIP P WEXIT LAY DOWN MILLING BHA -UNSTAB INJECTOR AND SET BACK -BREAK OUT AND LAY DOWN BHA#3 -MILLS IN GAUGE 2.74 NO-GO 2.73 GO Printed 1/11/2016 9:04:09AM ,1111 North America ALASKA BP Page 8d3Q Operation Summary Report t:k ' Common Well Name:E-20 AFE No Event Type:RE-ENTER-ONSHORE(RON) Start Date:12/30/2015 End Date:1/4/2016 X3-017KD-C:(2,808,451.90) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.:NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM 'Rig Release: Rig Contractor:NORDIC CALISTA UWI:500292057600 Active datum:28.50+30.61 GL t59.11usft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase I Description of Operations (hr) (usft) 16:20 - 17:00 0.67 DRILL P PROD1 MAKE UP PRODUCTION LATERAL BUILD/LATERAL DRILLING BHA#4 PJSM WITH CREW.DISCUSS SPECIFIC TASK RESPONSIBILITIES AND NON-SHEARABLES ACROSS STACK VERIFIED THAT COMPLETE BHA IS SHORT ENOUGH TO PULL ALL THE WAY OUT OF THE WELL AND SHUT-IN WELL WITH BLIND RAMS IF WELL CONTROL BECAME AN ISSUE. REVIEWED NORDIC BHA PICKUP/LAYDOWN PROCEDURE -PICK UP MOTOR AND MAKE UP BIT -MAKE UP REMAINDER OF BHA -PICK UP INJECTOR,MAKE UP COIL CONNECTOR TO BHA -STAB INJECTOR -PT QTS 300-PSI LO/4000-PSI HI FOR 5/5 MINUTES,GOOD TEST SHALLOW TEST MWD,GOOD TEST 17:00 - 19:00 2.00 DRILL P PROD1 RIM WITH PRODUCTION LATERAL BUILD/LATERAL DRILLING BHA#4 -MM IN=0.5-BPM AT 1370-PSI MM OUT=0.9-BPM -RIH SPEED 85-90 FPM 19:00 - 21:15 2.25 DRILL P PROD1 LOG TIE IN F/9835',MINUS 8.5 CORRECTION. - RIH THRU WINDOW,SMOOTH.CLOSE EDC. -TAG @ 10.032'.STALL,PICK UP AND BEGIN DRILLING BUILD SECTION. DRILL 3.25"BUILD/LATERAL SECTION F/ 10,032-10,117 MD MM IN/OUT:1.65/1.65 CIRC PSI:3525 MW IN/OUT:9.49 PPG/9.42 PPG IA//PVT:15/ 334 WOB/ECD:1-3K/10.29 -AVG ROP 40-50 FPH NO LOSSES 21:15 - 00:00 2.75 DRILL P PROD1 SHORT WIPER TRIP TO 10,080'. -DRILL AHEAD F/10,117'-10,177' -MM IN/OUT:1.66/1.66 CIRC PSI:3525 -MW IN/OUT:9.48 PPG/9.45 PPG -IA//PVT:15/ 334(BLED I/A DOWN F/170-50 PSI. WOB/ECD:1-3K/10.33 -AVG ROP 40-50 FPH NO LOSSES 1/2/2016 00:00 - 04:00 4.00 DRILL P PROD1 CONTINUE TO DRILL BUILD SECTION. DRILL 3.25"BUILD/LATERAL SECTION F/ 10,117'-10,346'MD -MM IN/OUT:1.65/1.65 CIRC PSI:3525 -MW IN/OUT:9.49 PPG/9.42 PPG -IA//PVT:15/ 334 -WOB/ECD:1-3K/10.29 -AVG ROP 40-50 FPH NO LOSSES 04:00 - 06:00 2.00 DRILL P PROD1 PJSM.CIRCULATE UP SAMPLES AS PER GEOLOGIST. -CIRCULATE UP SAMPLES F/10,303'.10,320' &10,340'. -POOH TO 10,030',PUMPING 1.85 BPM 3750 PSI. -LOG TIE IN t 10,030',ADD 2'CORRECTION. RBIH TO DRILL AHEAD AS PER GEOLOGIST. Printed 1/11/2016 9.04.09AM TREE= 4-1/16'aW • E-20 BATY NOTES: WELL ANGLE<70" '7, 10601 -4-112 CHROME TBG"' WELLI-15D= RIC ACTUATOR= OTTS ilnAL KB.EP/= 60.54' ry____.--I" 2018' 19-5/8"FES CEMENTER BE ELEV= 32.01' 20"CONDUCTOR -1 -110 CI KOP= 2900' 9-5/8'CSG,40# E.--1 2040' H9-5/8"BKR ECP,10=-8.867" , 2061' g IT4ax Angle= 87° 10190' L-60 Fly LI 563. 1811 Cilium AV= 9821' ID= 12.347" Datum 1VD= 8800'ss II 2128' --14-1/2"FES X Nip,D=1813" 9-5/8"BKR CSG PATCH,D=-9.96" --I 2061' -2065' L GAS LFT MA NCRB_S 13-3/8"CSG, 72#, L-80.ID=12.347" -1 2699' / ST MD IA/0 DEV TY FE VLV LATCH PORT DATE 7"SCOOP GUIDE (11/07/12) - 3462' • N 2 3644 3615 24 KBG2 DOLE BK 16 11/23/15 • 349-(-)7-1------. . '• • 1 6542 6007 33 KBG2 SO BK 20 11/23/15 ESTIMATED TOP OF CBAENT 1 8607' -7"FES FLOAT COLLAR w/3/8"ORFACE HOLE Minimum ID =2.3.77" @ 10749' S. 8624' -f 7"BKR LOC 8 SEAL ASSY (3 SETS),ID=6.17"j 3-3/16 X 2-7/8" XO r .1 - 8625' -9-5/8"X 7"BKR ZXP LNR TOP FKR w/T133ACK SLV,ID=6.30" 7"T1B3ACK/SCAB LW,26#,L-80 -1 8625' .%**N"-... 9647 -9-5/8"X 7"BKR HMC LNR HGNR,ID=6.310" BTC-M,.0383 bpf,ID=6.276" 9-5/8"CSG,47#,L-80,ID=8.681' - -8767 """-------- MLLOUT WINDOW(E-20A) 8767'-8783' if------1 9025' -f4-1/2"HES X NIP,0=3.813" 1.4 g--I 9054' -17"X 4-1/7 HES TNT FKR,13=3.856" I 9088' -14-1/2"I IC._,X NIP,ID=3.813' 9151' -3.70"BTT GEN 2 DEPLOY SLV,C=IGO" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, -( 9159" VS s * 9173' -I3-1/2"I IE. X NP,ID=2.813' .0158 bpf,ID=3.958" -.. A• 9174' 7'X 4-1/2"UNIQUE OVERSHOT.D=4.654" 4-1/2"TUBING STUB(08/17/12) 9155' III 4:, /2 I _ 1 9195' H4-1 "HES X NP,D=3.813' IBEHIND I 4 - 9216' -r X 4-1/2"BKR S-3 PKR,ID=3875" CTLNR .ti 9240' -4-1/2"FiES X NP, 13=3.813" 4-1/2'TBG, 12.6#,13CR-80 VAM TOP 1 9273' 0 .0. 9261' 4-1/2"FES XN NP,PALLED TO 3,80" 11/24/12 -[ ( ) .0152 bpf,0=3.958- a 0 9266' -r X 5"BKR ZXP LTPw fT133ACK SLV,ID=4,44" L le 7 '' -1 1k,..., 7"LNR,26#,L-80 BTC-M,.0383 bpf,ID=6.276" -1 9425' ..:4-4 9234-1/2"WLEG,0=3.958' Q I pg 1313-I 1 lig N 9279' -17'X 5"BKR FLEX-LOCK HGR ID=4.4.4" ND CT L l• 9289 3-1/2"LNR,9.3#,L-80 STL,.0087 bpi,ID=2.997 -I 9520' :t 4. k ' -5"X 4-1/2"X0,ID=3.958" -13-1/2"X 3-3/16"XO,ID=2.786" 4-1/2"VVHFSTOCK(11/24/12) -I 9530' 4 , kr , 9520' 4-1/2"LNR, 12.6#,L-80 IBT-M, .0152 bpf,D=3.958' -9539 44IP AALLOUT WINDOW(E-20B) ' ' 3-3/16"BKR PKR WHPSTOCK(12/31/15) -FiWrr 9530 -9538 ...• i.. FERFORA DON SUIMANRY REF LOG: ANGLE AT TOP PERF: 68"g 10620' I Note:Refer to R-oduction DB for historical perf data SIZE SPF NTERVAL Opn/Sqz SHOT SQZ 10749' H3-3/16"X 2-7/8'X0,ID--=2.377" 2" 6 10620- 10730 C 11/30/12 3-1/4"LNR,6.60#,L-80 TC11,.0079 bpf,D=2.850'1 10749' PBTD I 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,ID=2.441" -I 10782' --1 10762' !li DATE REV BY COMMINTS (ATE REV BY COWAENTS FRUDHOE BAY UlkIfT 12/17/61 N22E INITIAL COMPLETION 12/12/12 BSE/JRAD GLV C/0(12/08/12) WELL: E-20B 10117104 PQES SIDETRACK(E-20A) 01/28/13 Nkt/PJC FiNIAL DRLG CORRECTIONS FATMr 2121200 11/22/12 D-14 FANO 03/20/14 WECIJAAD GLV C/0(03/14/14) API No: 50-029-20576-02 12/02112 NORDIC 1 CTD SIDETRACK(E-20B) 12/30/15 CJN/JMD GLV C10(11/23/15) SEC6,T11N,R14E, 1743'RI_&883'Fa. 12/02/12 PJC CRLG DRAFT CORRECTIONS 01/21/16 TRYJAK) SEFWS(12/31/15) , 12/08/12 PJC CRLG DRAFT CORRECTIONS BP Exploration(Alaska) • • ti OF Ty, 4,,,,-„ 11/77;.,s..A THE STATE Alaska Oil and Gas of Conservation Commission utt 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 11041-S,- Main: 907.279.1433 r)44' AS ' Fax: 907.276.7542 www.aogcc.alaska.gov John McMullen lac Engineering Team Lead BP Exploration(Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E-20B Sundry Number: 315-688 'CANNEV NOV 2 2015 Dear Mr. McMullen: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, al&cy Cathy P. Foerster ,, Chair DATED this I3 day of November, 2015 Encl. RBDMS JOV 16 2015 STATE OF ALASKA •ALASKA OIL AND GAS CONSERVATION COMM N APPLICATION FOR SUNDRY APPROVALS • 20 AAC 25.280 1. Type of Request: Abandon 0 Plug Perforations o Fracture Stimulate 0 Pull Tubing 0 Operations shutdown 0 Suspend 0 Perforate 0 Other Stimulate 0 Alter Casing 0 Change Approved Program 0 Plug for Redrill a Perforate New Pool 0 Repair Well 0 Re-enter Susp Well 0 Other 0 CT b 2. Operator Name: BP Exploration(Alaska),Inc 4. Current Well Class: 5. Permit to Drill Number: 212-120 • 3, Address: P.O.Box 196612 Anchorage,AK Exploratory 0 Development p 99519-6612 Stratigraphic 0 Service ❑ 6. API Number: 50-029-20576-02-00• 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? Will planned perforations require a spacing exception? Yes 0 No EI PBU E-20B . RECEIVED 9. Property Designation(Lease Number): 110. Field/Pools: NOV 0 6 20 15 ADL 028304 4 PRUDHOE BAY,PRUDHOE OIL • 11. PRESENT WELL CONDITION SUMMARY (p•�) Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): JunkZ r : 10782 • 9069 • 10762 • 9061 • None None Casing Length Size MD TVD Burst Collapse Conductor 80 20"x 30" 30-110 30-110 Surface 2669 13-3/8" 30-2699 30-2699 4930 2670 Intermediate 8738 9-5/8" 29-8767 29-7907 5750/6870 3090/4760 Liner 264 4-1/2" 9266-9530 8349-8593 8430 7500 Liner 1631 3-1/2"x3-1/4" 9151-10782 8245-9069' Liner x2-7/8" Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 10620-10730 9004-9047 4-1/2",12.6# 13Cr80/13Cr85 9275 Packers and SSSV Type: 4-1/2"HES TNT Packer Packers and SSSV MD(ft)and TVD(ft): 9049/8153 4-1/2"Baker S-3 Perm Packer 9218/8305 12.Attachments: Description Summary of Proposal m 13.Well Class after proposed work: BOP Sketch p Detailed Operations Program 0 Exploratory 0 Stratigraphic 0 Development El • Service 0 14.Estimated Date for Commencing Operations: November 15,2016 • 15. Well Status after proposed work: Oil 0 Gas 0 WDSPL 0 Suspended IBJ • 16.Verbal Approval: Date: WINJ 0 GINJ 0 WAG 0 Abandoned o Commission Representative: Op Shutdown 0 GSTOR 0 SPLUG 0 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Browning,Zachary H Email Zachary.Browning@bp.com Printed Name John Iv 1 n? Title Engineering Team Lead ....yt/.1 ,_...„„ Signature L Phone +1 907 564 4711 Date 4716 i'' '''' -- COMMISSION USE ONLY Conditions of approval:Notify Commission so that a representative may witness Sundry Number: cta3 65— Cp5scts Plug Integrity 0 BOP Test 6d Mechanical Integrity Test 0 Location Clearance 0 Other: .( 36 o l`,a• .P sF ( /yI SSI"' 2-57s-f5') )4. A tfe.ks n cat, Pi+•L P14. -e. n..t+--t_ 4p1/a, i.`e z- .474cz- /'z ( Spacing Exception Required? Yes 0 No Q' Subsequent Form Required: /6 -41 0 7 / APPROVED BYTHE Approved by: /` �L�- COMMISSIONER COMMISSION Date: //—/3��S� ORIGINAL $D RV 11-/3.44 Submit Form and Attachments in Duplicate Form 10-403 Revised 5/2015 • Approved application is valid for 12 months from the date of approval. • • To: Alaska Oil & Gas Conservation Commission From: Zach Browning bp CTD Engineer Date: November 4, 2015 Re: E-20B Sundry Approval Request Sundry approval is requested to plug the E-20B perforations as part of the preparation, drilling and completing the proposed E-20C coiled tubing sidetrack. History of E-20B: E-20B was completed as a CTD sidetrack in 2012. Unfortunately it came on with high GOR and has never been competitive and has no future wellwork options. The well has passed integrity and is fit for a sidetrack. Proposed plan for E-20C: Drill a through tubing sidetrack with the Nordic 1 Coiled Tubing Drilling rig on or around December 1St, 2015. The E 20C sidetrack will be a single string exit from the existing 3- 3/16" liner. A packer whipstock will be set with the rig allowing isolation from the parent perforations. The planned well kicks-off in Zone 4, builds through the conglomerates and will land and target reserves in Zones 1A/1 B. The proposed sidetrack is a -1150' horizontal Ivishak Zone 1 producer to be completed with a 2-3/8" L-80 solid liner, cemented in place and selectively perforated. This Sundry covers plugging the existing E-20B perforations via the packer whipstock set with the rig and liner cement lob or liner top packer, if the liner lap pressure test fails (alternate plug placement per 20 MC 25.112(i)). The following describes the work planned and is submitted as an attachment to Form 10-403. A schematic diagram of the current well and proposed sidetrack is attached for reference. C-Zug � .ti t�C r/tic.— ?.L/S. kc:� � c c��c rx.,�r�-al c=ry. v1rc c 2-t---)/C7 � n viz- - 2 t��� /c��i4 / 3 Cc,"GUt. 14e SU`1eGf wed c 1vC ft? 4 &," plz 60.41e G✓ ` r'kee ' " P.rr e frer r0 P"Ilf/6e ,'r 11*/e Tie rid fr&- t /f /v 70 Mop/5 (10,1 Trio k ell fOr red(III �' loe /1 a/?w to,- 1''4129 r (ovc% from /uit) ?rti'cm tAe POd. • • Pre-Rig Work(scheduled to begin November 15th,2015) 1. C Drift for Whipstock. 2. F A/SL: Circ IA to diesel 3. S Set Generic GLVs 4. V Pre-CTD tree work. Set TWC. Rig Work(scheduled to begin December 1st, 2015) 1. MIRU and test BOPE 250 psi low and 3,500 psi high (MASP 2,575 psi). 2. Mill 2.80"window and 10' of ra iole. r PA-KC&2 w k.p5f-e 3. Drill build and lateral: 3.25" OH, -1146' (16 deg DLS planned). 4. Run 2-3/8" L-80 liner leaving TOL at-9500' MD. 5. Pump primary cement job: 10 bbls, 15.3 ppg Class G, TOC at-9500' MD.* 6. Liner cleanout and GR/CCL/RPM log. *May be performed post rig 7. Perform liner lap test. 8. Perforate -200' based on log interpretation. *May be performed post rig 9. Freeze protect well to a min 2,200' TVDss. 10. Close in tree, RDMO. * Approved alternate plug placement per 20 AAC 25.112(i) Post-Rig Work: 1. Re-install wellhouse, and flowline. 2. Set liner top packer with service coil if liner lap test fails.* 3. Contingency - MRPM, initial perfs (6 gun runs). Set 2-3/8" inline orifice/ packer at toe for lift. Zach Browning CC: Well File CTD Engineer Joe Lastufka 564-5220 . TlELL 4-1/16'CIC WEL • E_2 0 B CHROME TBGSA S: WB L ANGLE<70°@ 10601"`4-1/2" LFEAD= FMC ACTUATOR= OTIS NTIAL KB.ELEV=60 .54 ' I BF. _EV= 32.01' 20'CONDUCTOR - - -110 a 0.�-~_-] 2018' -19-5/8"HES CEMENTER KOP= 2900' 9-5/8"CSG,40#, 2061' g 2.----1 2040' -19-5/8"BKR ECP,ID=8.867" Max Angle= 87°@ 10190' L-80 HYD 563, 1 Datum MD= 9821' D=12.347" 2128' -4-1/2'FES X NP,D=3.813" IlitumTVD= 8800'SS 9-5/8"BKR CSG PATCH,D=-9.96" H 2061'-2065' ' GAS LFT MANDRELS 13-3/8"CSG,72#,L-80,D=12.347" --) 2699' ‘ / ST MD IV; DEV TYPE VLV LATCH PORT DATE- ", 2 3644 3615 24 KBG2 DMY BK 0 03/15/14 7"SCOOP GUIDE (11/07/12) - 3462' . 3 1 6542 6007 33 KBG2 OMY BK 0 03/15/14 ESTIMATED TOP OF CEMENT -i 3490' K 8607' H 7•HES FLOATCOLLA R w/3/8"ORFACE HOLE Minimum ID =2.3.77" @ 10749' k 3-3/1 s X 2-7/8" XO 8624' -17"BKR LOC&SEAL ASSY(3 SETS),ID=6.17" 8625' J 9-5/8"X 7"BKR ZXP LNR TOP PKR w/TEBACK SLV,13=6.30" 7"TIEBACK/SCAB LNR 26#,L-80 - 8625' \ BTC-M,.0383 bpf,D=6.276" / ` 8642' H9-5/8"X 7"BKR HMC LNR HGNR,ID=6.310" 9-5/8"CSG,47#,L-80,ID=8.681" - -8767 -------- MLLOUT WINDOW(E-20A) 876T-8783' 1 r---i 9025' -14-112"HES X NP,D=3.813` z > L 9054' -17"X 4-1/7 HES TNT PKR,D=3.856" L9088' -4-1/2"HES X NP,D=3.813" 9151' H3.70"BTT GEN 2 DEPLOY SLV,D=3.00' 4-1/7 TBG,12.6#,13CR-85 VAM TOP, -{ 9159' t 9173' H 3-1/2'HES X NP,D=2.81371 .0158 bpf,ID=3.958" 9174' 7"X 4-1/7 UNIQUE OVERSHOT,ID=4.654" 4-1/2'TUBING STUB(08/17/12) - 9155' ! M 9195' 4-112"HES X NP,D=3.813" 1813#ND I - L 9216' -7"X 4-1/7 BKR S-3 PKR,ID=3.875' CT LNR 9240' -4-1/2"HES X NP,D=3.813" 4-1/2'TBG, 12.6#,13CR-80 VAM TOP -I 9273' • 09261• - 4-1/2"HES XN NP,MLLED TO 3.80"(11/24/12) 1 .0152 bpf,D=3.958" iir * L 9266' --{7"X 5"BKR ZXP LTP wTIEB /TIEBACK SLV,D=4.44" 7'LNR 26#,L-80 BTC-M, .0383 bpf,D=6-276" -I 9425' ; 9273' -141/2`WLEG,ID=3.958" r 9279' H7"X 5"BKR FLEX-LOCK HGR,D=4.44" , ICT LNO 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,ID=2.992" 9520' t + 9289' -15"X 4-1/2"XO,ID=3.958" rl 4-1/7 WHIPSTOCK(11/24/121{ 9530' t. 9520' 13-1/2"X 3-3/16"XO,ID=2.786" 4-1/2'LNR,12.6#,L-80 EBT-M, .0152 bpf,ID=3.958" - -9530 '�. y k' V PERFORATION SUMMARY i MLLOUT WNDOW(E-206)-9530'-9538' REF LOG: - ` ANGLE AT TOP PERE 68'@ 10620' Note:Refer to Production DB for historical perf data SIZE SPF NTERVAL Opn/Sqz SHOT SOZ 2" 6 10620-10730 0 11/30/12 T 10749' -13-3/16"X 2-7/8"X0,13=2.377" [3-1/4"LNR,6.60#,L-80 TC11,.0079 bpf,D=2.850'--{ 10749' 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,ID=2.441" I--1 10782' - _+.._ � D 10762' DATE REV BY COMMENTS DATE REV BY COMVENTS PRUDHOE BAY UNIT 12/17/81 N22E INTIAL COMPLETION 12/12/12 BSE/JND GLV GO(12/08/12) WELL. E 20B 10/17/04 t42ES SIDETRACK(E-20A) 01/28/13 NMc/PJC ANAL DRUG CORRECTIONS PERMIT No:`2121200 11/22)12 D-14 MO * 03/20/14 CEGJM)GLV GO(03/14/14) AFI No: 50-029-20576-02 12/02/12 NORDIC 1 CTD SIDETRACK(E20B) SEC 6,T11N,R14E,1743'Ft'L&883'FEL 12/02/12 PJC DRUG DRAFT CORRECTIONS 12/08/12 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) I TREE= 4-1/16'CNV 'vaIJ EAD= FMC • E-213 CHROME TBG'% T • WELL ANGLE<TO" 10601 "'4-1/2" l ACTUATOR= OM KB.�El/= 60.54' BF,FL 2018' -9-5/8"HES CEMENTER li BF.ELEV= 32.01' 20'CONDUCTOR -i -110 a KOP= 2900' 9-5/8"CSG,40#, 2061' g 2040' -{9-5/8"BKR ECP,ID=-8.867" Max Angle= 87"@ 10190' L-80 HYD 563, 11111 Datum MD= 9821' D=12.347' 2128' H 4-1/2"HES X NP,D=3.813" Datum TVD= 8800'SS r 9-5/8"BKR CSG PATCH,D=9.96;1-1 2061' -2065_ ' GAS LFT MANDRELS 13-3/8"CSG,72#,L-80,D= 12.347" -I 2699' 'ST MD ND DEV TYPE VLV LATCH PORT DATE 2 3644 3615 24 KBG2 DMY BK 0 03/15/14 7'SCOOP GUDE (11107/12} --( 3462' ,., IF 1 6542 6007 33 KBG2 DMY BK 0 03/15/14 ESTMA I HJ TOP OF CEMENT -1 3490' .4 .. 8607' -{i"IES FLOAT COLLAR w/3/8'ORFACE HOLE Minimum ID =X.XXf' @ XXXX. •! `-' 4; 8624' -17"BKR LOC&SEAL ASSY(3 SETS),D=6.17" L8625' 19-5/8"X 7"BKR ZXP LNR TOP PKR I w/TRACK SLV,D=6.30" J 7"TIEBACK/SCAB LNR,26#,L-80 -I 8625' BTC M,.0383 bpf,D=6.276" " 8642' H9-518"X 7"BKR HMG LNR HGNR,ID=6.310"J 9-5/8'CSG,47#,L-80,ID=8.681" - -8767 "---/ MILLOUT WPDOW(E-20A) 8767'-8783' 9025' 1-14-1/2"I Iii X NP,D=3.813" ,-v X 9054' -17"X 4-1/2"HES TNT PKR,D=3.856" 9088' J4-1/2'HES X NP,D=3.813" 9151' -13.70"BTT GEN 2 DEPLOY SLV,D=3.00" 4-1/2'TBG,12.6#,13CR-85 VAM TOP, --1 9159' j 9173' H3-1/2'I IES X NP,D=2.813" 0158 bpf,ID=3.958' 9174' --17"X 4-1/2"UNIQUE OVERSHOT,ID=4.654" - 4-1/2"TUBING STUB(08/17/12) - 9155' i 9195' -�4-1/2"I IM X NP,D=3.813" BB-1ND I 4-1/2"TBG, 12.6#,13CR-80 VAM TOP -{ 9273' 00.7. 9216'x-17"X 4-1/2"BKR S 3 PKR D=3.875" CT LNR .0152 bpf,D=3.958" 3 9240' -14-1/2"FDS X NP,D=3.813' 9261' -14-1/2'HES XN NP,MLLEDTO 3.80"(11124/12} l 7'LNR,26#,L-80 BTC-M, .0383 bpf,D=6.2761-1 9425' 1 .4..-11 9266' -17"X5"BKR ZXP LTP w/TRACK SLV,I)=4.44" 'i' 9273' -{471/2"WLEG,D=3.958" 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,ID=2.992' 9520' ' 9279' -17'X 5"BKR FLEX-LOCK HGR,D=4.44" I BEHIND CT LNR 4-1/2 WHPSTOCK(11/24/12) H 9530' 4 9289' -5"X 4-1/2"XO,ID=3.958" 14-112"LNR, 12.6#,L-80 BT-M,.0152 bpf,13=3.958" ---1 -9530 ( a. -9500 POF 2-3/8"LNR x x x"BKR PACKET UYHPSTOCK(MM/DDIY Y} 10020' t 1 F� 4 ' 9520' -13-112'X 3-3/16"X0,D=2.786" 5K5-1/4^LNR,6.60#,L-80 TC11,.0079 bpf,D=2.850"--I 10749' t (BENIND 1 ,0 I, 2-7/8"LNR,6.5#,L-80 SIL,.0058 bpf,D=2_441'_1-I 10782' "C"CT LNF Wtt`D ,'i NIL LOUT OW(E-208) 9530'-9538' t PERFORATION SUMMARY REF LOG: MLLOUT WINDOW(E-20C) 10,020'-10,030' h ANGLE AT TOP EST:xx'@ xxxx' 3.y5� Note:Refer to Production DB for historical perf data Dd TBD H JRA TAG SIZE SFF INTF32VAL Opn/Sgz SHOT SQZ / •z ' Mrd c,./11. c 4J S�+'I PBTD -I XXXX' I !b 2-3/8"LNR X.X#,L-80 SIL, .0039 bpf,1D=1.99X" 1 1 1166' i *r3,�- DATE REV BY COMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/17/81 N22E INTIAL COMPLETION 10/26/15 ZI-E3/TI...H PROPOSR)CTD WELL: E-20B 10/17/04 N2ES SIDETRACK(E-20A) PERMIT No:"2121200 11/22/12 D-14 RWO API No: 50-029-20576-02 12/02/12 NORDIC 1 CTD SIDETRACK(E-206) SEC 6,T11 N,R14E,1743'FNL&883'FEL 01/28/13 Mk/PJC FINAL DRLG CORRECTIONS BP Exploration(Alaska) • • 0 •i'9. E 1,,,,.- 0 m =E • 9 I1 y > 'ill 8 WV.1 en . in f 10 11 "1111I I 11 I 9 C 2 a. ? . IX i ,I v • • q m I_ •'I9I11'11 cllo o ii m m o 8 +ob C $ 2 C m o ~ EL Q• e; o, 7 . CI Mil1n - ' : 'mmol I Milk 1112 1 in III I LL �� �� TB t \ a « To 1 Y44 1 IH i11, - 111 LL a z111 111 H ICIlir1 _ n1 n1 Q .I p E 0 111 .r.- U 1 Wa rc" iiLL I11 J I. �' o E E III ILI 0.4 Et U f Et 2 W tt1 0 0 E1, N I E = tr 1 N U ►�, IC r . 1104 a I— .- a II Qi 1 Ei U I s` 1 1 U p m 1 y _ Et3 I m- o a m 1 ?I 12 0 1m i 111 �'� rsrsu�vrfr'-err`,. I m ■o K 3 AI Iti 09,"3I a [ 0 Nil IAII I •, Q 1 M Ha Iii 41 N o o I in r D I 2�° 11y1 n 1 @I) 1a �r • Sundry Application Plug for Re-drill Wells Work Flow This process is used to identify wells that are suspended for a very short time prior to being re- drilled. Those wells that are not re-drilled immediately are identified every 6 months and assigned a current status of"Suspended." Step Task Responsible 1 The initial reviewer will check to ensure that the "Plug for Redrill" box Geologist S in the upper left corner of Form 10-403 is checked. If the "Abandon" or "Suspend"boxes are also checked, cross out that erroneous entry and initial it on both copies of the Form 10-403 (AOGCC's and operator's copies). 2 If the "Abandon" box is checked in Box 15 (Well Status after proposed Geologist Ais work) the initial reviewer will cross out that erroneous entry and initial then / it on both copies of the Form 10-403 (AOGCC's and operator's copies). �/ Instead, check the "Suspended" box and initial that change. Drilling Engineer The drilling engineers will serve as quality control for steps 1 and 2. (QC) 3 When the Stat Tech receives a Form 10-403 with a check in the "Plug Stat Tech for Redrill"box, they will enter the Typ_Work code "IPBRD" into the History tab for the well in RBDMS. This code automatically generates a comment in the well history that states "Intent: Plug for Redrill." 4 When the Stat Tech receives any Form 10-407, they will check the Stat Tech History tab in RBDMS for the "Intent: Plug for Redrill" code (IPBRD). If present and there is no evidence that a subsequent re-drill has been COMPLETED, the Stat Tech will assign a status of SUSPENDED to the well bore in RBDMS no matter what status is listed on the 10-407. The Stat Tech will also change the status on the 10-407 form to SUSPENDED, and date and initial this change. If the Stat Tech does not see the "Intent: Plug for Redrill" comment or code, they will enter the status listed on the Form 10-407 into RBDMS. 5 When the Form 10-407 for the redrill is received, the Stat Tech will Stat Tech change the original well's status from SUSPENDED to ABANDONED. 6 The first week of every January and July, the Stat Tech and one of the Stat Tech Geologists will check the "Well by Type Work Outstanding" user query Geologist in RBDMS to ensure that all of the Plug for Redrill wells have been handled properly. At this same time, they will also review the list of suspended wells for accuracy. Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable b lo�.direct inspection of the file. - La() Well History File Identifier Organizing (done) ❑ Two-sided ❑ Rescan Needed RE CAN: OVERSIZED: NOTES: C or Items: ❑ Maps: Grayscale Items: gs: ❑ Poor Quality Originals: ❑ Other: ❑ Other: BY: Date: (D13) J Li /s/ YI1P Project Proofing + BY: den Date: I 3 / /s/ Vld Scanning Preparation I x 30 = 3 D + 1 / = TOTAL PAGES 4'7 (Count does not include cover sheet) ity BY: Date: )..17/7.1. /s/ Production Scanning 1. Stage 1 Page Count from Scanned LiFile: - (Count does include cove heet) Page Count Matches Number in Scanning Pr paration: YES NO BY: dilL1 Date: ' 44 3 ' /s// p Stage 1 If NO in stage 1, page(s) discrepancies wer found: YES NO BY: Maria Date: /s/ Stage 2 Additional Well Reports: YES NO TOTAL PAGES: Digital version appended by: Meredith Michal Date: /s/ Final Page Count: Stage 1 + Stage 2: TOTAL PAGES: Scanning is complete at this point unless rescanning is required. ReScanned BY: Maria Date: /s/ Comments about this file: Quality Checked 7/8/2014 Well History File Cover Page_20140708.doc o j O 0 as E H li m W . co E �° / Z�Z/Z n Z ! � to ca E C9 -`o } }} } N Cl Fo D. 0) 0 co a W co U II; >1.-1 '.I. g c� _1 + o > E ° ' 9 5 }I co E C 0) > N V1 .0 T co To' a O J H N a N Q > a) U C Con C a) a) CD Z 2 'y c a 0. O Z ?? a) O f(0 O O 7 FL cf) I 8 L t O Z c 0) 0 CD a fd a To o' a a o O co + a) a) 2 C ca N W C a) co o. 8 O O a ° 2 onco U U J o u_ y a J u o a) a) E Z c a I U O 4 I I p l o2 49 r U� a a°` cm �J °° Z ° E o 0 o Z 0 m m� = E 2 c Q /a Y I d U- a m Z Z I EIix Ce E a) m co _ >- E. }N � Ea) NF. J m > niQU m� 0 � V INQ o � 2U a 2� � co ° 0 O 00 wC NN M M CO M M_ a a..-' .7 m co O. Y > N N O _O E. _O O Qtcn O 0 W v v c•-.1. N N N N N Z - a) @ N N (D CO CO CO CO 0) CC ON N M M COCOC° N a) J it. E a on n W xw C C C C C C C O) y a) co co a. UO E E ,U m O I O O O O O O Cl)Z CO 0Ce 0 w < co co c m c y 0 O o 0 0 o O .O- E p ° 1 d c M U U 0.1 C ZI j C t o o °) 0) O) a) C O 1 2 C) C') f;:: . UN- M) U)en U C O a , CO rn Fn rn °) °) 1 N O p E i E I /Z 0 j In , c c OI >- >- >-Q o cc z11 / o / N to N �9j _ o E F- N a) O O O y O j S� _ o J �' 0 0 0 co G N J p y COa J o) )o 1° c m E W m r O J N N N N C O 1- E W /U t m T ° I O a) �/� I m Vl) v Cl)Cc C/) = p C O Q C � To 3 co F— Z 2 Q Zo- N- � >, LT ' EO o ! o p 0 f= / 2 2 a) nnz ; ( c > > > co cu a) c c ct CC • co = co oo g ° ° E E E co co co o Z / O) • CC Z ` m > > E E E ' o 0 5 5 Z Cl) 0 0 0 E Qco co co m } /} } c /0 N Q i 0 . t0 a N N rn rn rn a > r H a) g2 E M M N- N- n ,- W E Z I E Cal Cal Cal Cal N ON i < C c ea 7 N N N N N H U O CN ice r O I0. 0C a O € € E E z yo N ' z 12u �' ww v o v co eaZ O a) ` ~ ° Q / ao ^ o Oc a a a Ho o g o a) a co °' 2 0 0 U `� z W a) E J 0 E_ a w O o E Q7 3aQ Q ooad LL o ° a) O W d J W J J W ? 0 d U 0a 2 a0 J H/1 / It f 1 / / O fiC O N I...—.„ tto 1 41 Lo O Z !• n N V 4 D• I O to O Z F. a U O Z Q ? I N m I 6 co � r J co a LI a a o0 la 0 J a W X W J U m o Z aL u)7 J a Om O u) M c O • N p_ O O E -J r. m ICC r I W II'm IZ N V S CO >- I W m = O m ' A �_ co p , LQ re O QO a E ZTD _` • o �1 to N m V 71 3 N d N a' O▪ °r° u o I c 2 co E a o d G. 2 0 1 raft® _ iir. <,� ,g�: tr '. L.:a BAKER P INTI 14STRI >UTION LIST o 6 2013 HUGHES COMPANY_ BP Exploration(Alaska)Inc. INTERMEDIATE FINAL Yes (mandatory) WELL NAME 2O ) RUN NUMBER 2"��1 \ (mandatory) 2Z—I l / FIELD Prudhoe Bay BH SALESMAN Okechukwu(Okey)Anyanwu (mandatory) (mandatory) COUNTY North Slope Borough BH DISTRICT Alaska (mandatory) (mandatory) STATE Alaska PAGE OF (mandatory) LOG DATE: TODAYS DATE: 5/31/2013 (mandatory) DISTRIBUTION LIST AUTHORIZED BY: BP Exploration(Alaska)Inc. (mandatory) HAS CLIENT BEEN INVOICED FOR ADDITIONAL PRINTS? COMPANY FIELD FINAL CD 3 (digital/ ADDRESS(FEDEX WILL NOT DELIVER TO P.O.BOX) LOGS LOGS image) FILM PERSON ATTENTION #OF PRINTS #O Nhi�N 5 ,#OF COPIES ;#OF COPIES 4 4 B - ,G 4 B 1 1BP Exploration(Alaska)Inc. 1 1 3 1 1 I 1Petrotechnical Data Center LR2-1 1900 E.Benson Blvd. Anchorage,Alaska 99508 I 2 {ConocePhillips Alaska Inc. 1 I I 1 I I 1 ;Attu Ricky Elgarico IPO Box 100360 'Anchorage,Alaska 99510 3 ExxonMobil,Alaska ______1 11 1 1 1 1 1 Attn Lynda M.Yaskell and/or Leonardo Elias 3700 Centerpointe Dr. Suite 600 Anchorage,Alaska 99503 4 State of Alaska-AOGCC ! 1 1 1 1 1 I I 1 Christine Shartzer 333 West 7th Ave,Suite 100 Anchorage,Alaska 99501 i 5 DNR-Division of Oil&Gas f I 1 1 1 1 I 1 Attn:Sean Clifton 550 W.7th Ave,Suite 800 1 Anchorage,Alaska 99501 TOTALS FOR THIS PAGE: 0 5 5 0 0 0 TOTALS FOR ALL PAGES: 0 5 5 0 0 0 Zc2'L2-0 'L24o3 Letter of Transmittal BAKER ` Date: December 20, 2012 HUGHES To: From: State of Alaska AOGCC Baker Hughes 1NTEQ 333 W. 7th Ave., Suite 100 795 East 94th Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Bill Michaelson Please find enclosed the directional survey data for the following well(s): 18-27EPB1, 18-27EPB2, 18-27E 06-16A D-29A D-19C P-19L1PB1, P-19L1 P-12BL1 W-02B Z-07B Enclosed for each well(s): 2 hardcopy prints of directional survey reports 1 compact disk containing electronic survey files Please sign and return one copy of this transmittal form to: BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 to acknowledge receipt of this data. RECEIVED BY: 114.4,...(11) .e>defA- , State of Alaska AOGCC DATE: A 9-4I t 3 RECEIVED STATE OF ALASKA DEC 2 7 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION QO WELL COMPLETION OR RECOMPLETION REPORT AND LOG ' G GCV C 1a Well Status: • ®Oil 0 Gas 0 SPLUG 0 Other 0 Abandoned 0 Suspended lb. Well Class 20AAC 25 105 20AAC 25 110 0 Exploratory 0 Stratigraphic 0 GINJ 0 WINJ 0 WAG 0 WDSPL 0 Other No.of Completions One • ®Development 0 Service 2 Operator Name: 5.Date Comp.,Susp.,or Abend.. 12. Permit to Drill Number: BP Exploration(Alaska) Inc. 12/1/2012 • 212-120 • 3 Address. 6. Date Spudded: 13. API Number: P.O. Box 196612,Anchorage,Alaska 99519-6612 11/26/2012 • 50-029-20576-02-00 • 4a. Location of Well(Governmental Section): 7. Date T.D. Reached. 14 Well Name and Number: Surface 11/28/2012 PBU E-20B 1743' FNL,883' FEL, Sec.06, T11N, R14E, UM - 8 KB(ft above MSL). 59.11' ' 15. Field/Pool(s) Top of Productive Horizon: 3598'FNL, 1064'FWL, Sec. 05,T11N, R14E, UM GL(ft above MSL): 30.36' • Prudhoe Bay/Prudhoe Bay ' Total Depth- 9.Plug Back Depth(MD+TVD) . 3250'FNL, 1086'FWL, Sec. 05,T11N, R14E, UM • 10762' 9061' 4b. Location of Well(State Base Plane Coordinates,NAD: 10.Total Depth(MD+TVD) 16 Property Designation: Surface x- 664103 . y- 5975313 • Zone- ASP4 • 10782' 9069' ' ADL 028304 - TPI. x- 666096 y- 5973501 - Zone- ASP4 11.SSSV Depth(MD+TVD) 17. Land Use Permit. Total Depth.x- 666110 y- 5973849 Zone- ASP4 None 18 Directional Surve y ®Yes ❑No 19 Water depth,if offshore: 20. Thickness of Permafrost(ND). (Submit electronic and printed information per 20 AAC 25.050) N/A ft MSL 1900'(Approx.) 21 Logs Obtained (List all logs here and submit electronic and printed information per 20 AAC 25.071): 22. Re-Drill/Lateral Top Window MD/TVD: MWD/GR/RES, GR/CCL 9530' 8593' 23. CASING,LINER AND CEMENTING RECORD SETTING DEPTH MD SETTING DEPTH ND HOLE AMOUNT CASING WT.PER FT. GRADE TOP BOTTOM TOP BOTTOM SIZE CEMENTING RECORD PULLED 20"x 30" Insulated Conductor Surface 110' Surface 110' 36" 8 cu yds Concrete 13-3/8" 72# L-80 30' 2699' 30' 2699' 17-1/2" 2627 cu ft Arctic Set II 9-5/8" 40#/47# L-80 29' 8767' 29' 8767' 12-1/4" 1292 cu ft Class'G', 130 cu ft AS I,581 sx Class'G' 7" 26# L-80 3462' 9425' 3446' 8493' 8-1/2" 213 cu ft Class'G',466 cu ft'G', 163 cu ft'G' 4-1/2" 12.6# L-80 9266' 9530' 8349' 8593' 6-1/8" 162 cu ft Class'G' 3-1/2”x3-1/4"x2-7/8" 9 3#/6 6#16 5# L-80 9151' 10782' 8245' 9069' 4-1/8" 66 sx Class'G' 24. Open to production or injection? IN Yes 0 No 25. TUBING RECORD If Yes, list each interval open SIZE DEPTH SET(MD) PACKER SET(MD/ND) (MD+TVD of Top&Bottom;Perforation Size and Number)• 2"Gun Diameter,6 spf 4-1/2", 12.6#, 13Cr85/ 9273' 9054'/8158' 13Cr80 9216'/8303' 26. ACID,FRACTURE,CEMENT SQUEEZE,ETC. 10620'-10730' 9004'-9047' WAS HYDRAULIC FRACTURING USED DURING COMPLETION?❑Yes ®No r C DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED " IC DEPTH 2500' Freeze Protect w/40 Bbls of Diesel „Ob.411111/ . 27. PRODUCTION TEST Date First Production Method of Operation(Flowing,Gas Lift,etc December 13,2012 Flowing • Date of Test Hours Tested Production For OIL-BBL: GAS-MCF WATER-BBL: CHOKE SIZE' GAS-OIL RATIO. 12/14/2012 8 Test Period 4 908 6866 28 96 7564 Flow Tubing Casing Press. Calculated OIL-BBL: GAS-MCF. WATER-BBL. OIL GRAVITY-API(CORR). Press. 1360 1320 24-Hour Rate 4 2723 20597 85 N/A 28. CORE DATA Conventional Core(s)Acquired? 0 Yes ®No • Sidewall Core(s)Acquired? 0 Yes ®No. If Yes to either question,list formations and intervals cored(MD+TVD of top and bottom of each),and summarize lithology and presence of oil,gas or water (submit separate sheets with this form, if needed). Submit detailed descriptions,core chips,photographs and laboratory analytical results per 20 AAC 250.071. None RBDMS DEC 2 8 2012 ofif_\ Form 10-407 Revised 10/2012 I CONTINUED ON REVERSE- / Submit Original Only ,y'' ) /?•z S•/z ,t,•f 3 G 29. GEOLOGIC MARKERS(List all formations an "kers encounter 30. FORMATION TESTS NAME J TVD Well Tested? J Yes ®No • Permafrost Top If yes,list intervals and formations tested,briefly summarizing test Permafrost Base results. Attach separate sheets to this form,if needed,and submit detailed test information per 20 AAC 25.071. Sadlerochit/Zone 4 9549' 8612' None • CGL/Zone 3 9667' 8727' Base of CGL/Zone 2C 9715' 8772' 22TS/Zone 2B 9764' 8816' 21TS/Zone 2A 9837' 8869' Zone 1B 10410' 8954' TDF/Zone 1A 10622' 9005' Base of Sadlerochit 10730' 9048' Formation at Total Depth: Base of Sadlerochit 10730' 9048' 31 List of Attachment Summary of Daily Drilling Reports,Well Schematic Diagram, Surveys 32 I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Matt Ross,564-5782 Email: Matt.Ross@bp.com Printed Name: Title: Drilling Technologist Joe - i a Signature: ��' Phone 564-4091 Date: 12_J2- 7/12_ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. Item 1 a: Classification of Service Wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation,or Other. Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 4b. TPI(Top of Producing Interval). Item 8: The Kelly Bushing and Ground Level elevation in feet above mean sea level. Use same as reference for depth measurements given in other spaces on this form and in any attachments Item 13: The API number reported to AOGCC must be 14 digits(ex 50-029-20123-00-00). Item 20: Report true vertical thickness of permafrost in Box 20. Provide MD and TVD for the top and base of permafrost in Box 28. Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval) Item 27• Method of Operation: Flowing,Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection,Gas Injection,Shut-In,or Other(explain). Item 28. Provide a listing of intervals cored and the corresponding formations,and a brief description in this box. Submit detailed description and analytical laboratory information required by 20 AAC 25.071 Item 30. Provide a listing of intervals tested and the corresponding formation,and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Form 10-407 Revised 10/2012 Submit Original Only TREE= 41/16"CNV 4 i SA FL _OYES: WELL ANGLE<70°©10601^`"41!2" � ACTUATOR= PJB DRAFT _ CHROME TBG***C OTIS KB ELEV= 60.54' t BF.ELEV 32.01' 20'CONDUCTOR --I -110 a J- 2018` -�s 5J8^HES Cevta�tTe� 2040' -9-5/8"BKR ECP,ID-8.867" KOP= 2900' 9-5/8"CSG,404, 2061' 8 Z Max Angle= 87°@ 10190' _...... __.... L-80 Hy D 563, Ilk Datum MD= 9821' Datum TVD= 8800'SS D=12347" ■ 2128' -14-1/7 HES X NP,D=3.813" 9-5/8"BKR CSG PATCH,D=9.96" H 2061'-2065' ■ ` GAS LIFT MANDRELS 13-3/8"CSG,72#,L-80,D=12347' -I 2699' �� ST MD TVD DEV TYPE VLV LATCH FORT DATE r SCOOP GUDE (11/07/12) - 3462' 2 3644 3615 24 KBG2 DONE BK 16 12/08/12 LI 1 6542 6007 33 KBG2 SO BK 20 12/08/12 ESTMAT®TOP OF CEMENT 3490' f 8607' -17"HES FLOAT COLLAR w/3/8"ORFFACE HOLE Minimum ID =2.3.77" @ 10749' 3-3/16 X 2-718" XO 8624' -17'BKR LOC&SEAL ASSY(3 SETS),ID=6.17" 8625' -9-5/8"X 7"BKR ZXP LNR TOP PKR w/TIEBACK SLV,D=6.30" 7"TIEBACK/SCAB LNR 26#,L-80 - 8625' \ BTC-M,.0383 bpf,D=6276' 8642' -19-5/8"X 7"BKR HMC LINP HGNR,ID=6.310" 9-5/8"CSG,474,L-80,ID=8.681" - -8767 '' " MLLOUT WNDOW(E-20A) 8767'-8783' ! 9025' _{4-112"HES X NP,D=3.813" 9054' -7"X 4-1/2'HES TNT PKR,D=3.856" 9088' -14-1/2"HES X NP,D=3.813" 9151' -I 3.70"BTT GEN 2 DEPLOY SLV,D=3.00" 4-1/2"TBG,12.6#,13CR-85 VAM TOP, - 9159' 1-2 9173' H 3-1/2"HES X NP,ID=2.813" .0158 bpf,ID=3.958" 4--. .... ."__.. '�� 9174' 7"X 4-1l2"UNIQUE OVERSHOT,ID=4.654" 4-1/2"TUBING STUB08/17/12 9155' j_H 9195' -14-1/2"HES X NP,D=3.813" STUB(08/17/12) IBB-OND X44 9216' -I 7"X 4-1/2"BKR S-3PKRD=3.875" CT LNR 9240' -14-1/2"HES XNP,D=3.813 4-1/2"TBG,12.64,13CR 80 VAM TOP -I 9273' i 9261' -I4-1/2"HES XN NP,MLLE )TO 3.80"(11/24/12) .0152 bpf,D=3.958" a!lit9266' -17"X 5"BKR ZXP LT'w/T1 ACK SLV,D=4.44" I 7'LNR,26#,L-80 BTC-M,.0383 bpf,D=6.276" -I 9425' -' • ^=' 9273' -{4-1/2'WLEG,D=3.958' I NI t, 9279' H 7"X 5"BKR FLEX-LOCK HGR,13=4.44" IBIS I CT LNR 3-1/2"LNR,9.3#,L-80 STL,.0087 bpf,ID=2.992' -I 9520' N. 9289' --I5"X4-1/2"XO,D=3.958" 4-1/2"WHPSTOCK(11/24/12) 9530' lit _9520' H3-112"X 3-3/16"XO,ID=2.786" 16 K 4-1/2"LNR,12.61f,L-80 BT-M,.0152 bpf,D=3.958" -9530 A41. li PERFORATION SUMMARY MLLOUT WNDOW(E-20B) 9530'-9538' REF LOG: ANGLE AT TOP PERF: 68°©10620` Nate:Refer to Production DB for historical perf data SIZE SPF NfBRVAL Opn/Sqz SHOT SQZ 7 6 10620-10730 0 11/30/12 1074.9' -I3-3/16"X 2-7/8'XO,D=2.377" 3-1/4"LNR,6.60#,L-80 TCI1,.0079 bpf,ID=2.850'H 10749' f/F_____/.:1 MID -j 10762' I 2-7/8"LNR,6.5#,L-80 STL,.0058 bpf,ID=2.441" --I 10782' DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY LINT 12/17/81 N22E IMTIAL COMPLETION 12/12/12 BSE/JMD GLV GO(12/08/12) WELL: E-20B 10/17/04 N2E5 SIDETRACK(E.20A) PERMIT-1,4x''2121200 11/22/12 0.14 RWO AP1No: 50-029-20576-02 12/02/12 NORDIC 1 CTD SIDETRACK(E-20B) SEC 6,T11 N,R14E 1743"FNL&883'FEL 12/02/12 PJC CRLG DRAFT CORRECTIONS 12/08/12 PJC DRLG DRAFT CORRECTIONS BP Exploration(Alaska) 1 riikI BAKER HUGHES INTEQ North America - ALASKA - BP Prudhoe Bay PB E Pad E-20 - Slot 20 / Lat: 070°20'19.961"1 Long: 0148°40'06.017"W E-20B Survey: MWD Survey Report - Geographic 07 December, 2012 Mill BAKER HUGHES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-20-Slot 20 Project: Prudhoe Bay TVD Reference: 28.50+30.61 GL @ 59.11ft(28.50+30.61 GL) Site: PB E Pad MD Reference: 28.50+30.61 GL @ 59.11ft(28.50+30.61 GL) Well: E-20 North Reference: True Wellbore: E-20B Survey Calculation Method: Minimum Curvature Design: E-20B Database: EDM.16-ANC Prod-WH24P Project Prudhoe Bay,GPB,PRUDHOE BAY Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site PB E Pad,TR-11-14 Site Position: Northing: 5,973,160.88ft Latitude: 70°19'59.134 N From: Map Easting: 662,538.97ft Longitude: 148°40'53.05 W Position Uncertainty: 0.00 ft Slot Radius: 0.000in Grid Convergence: 1.24 ° Well E-20 API No 500292057600 Well Position +N/-S 0.00 ft Northing: 5,975,313.00 ft Latitude: 70°20'19.961 N +EI-W 0.00 ft Easting: 664,103.00 ft Longitude: 148°40'6.02 W Position Uncertainty 0.00 ft Wellhead Elevation: ft Ground Level: 30.45ft Wellbore E-20B API No 500292057602 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2012 11/22/2012 20.71 81.05 57,635 Design E-20B Audit Notes: Version: Phase: ACTUAL Tie On Depth: 9,520.33 Vertical Section: Depth From(ND) +N/-S +E/-W Direction (ft) (ft) (ft) (°) 29.11 0.00 0.00 127.39 Survey Program Date: 12/7/2012 From To (ft) (ft) Survey(Wellbore) Tool Name Description 31.89 8,700.00 2:Gyrodata Survey 10/2/04(E-20) GYD-CT-CMS Gyrodata cont.casing m/s 8,767.00 9,520.33 E-20A IIFR(E-20A) MWD+IFR+MS MWD+IFR+Multi Station 9,530.00 10,781.00 MWD(E-20B) MWD MWD-Standard 12/7/2012 11:33:53AM Page 2 COMPASS 2003.16 Build 73 BAKER HUGHES Survey Report-Geographic 0 by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-20-Slot 20 Project: Prudhoe Bay TVD Reference: 28.50+30.61 GL @ 59.11ft(28.50+30.61 GL) Site: PB E Pad MD Reference: 28.50+30.61 GL @ 59.11ft(28.50+30.61 GL) Well: E-20 North Reference: True Wellbore: E-20B Survey Calculation Method: Minimum Curvature Design: E-20B Database: EDM.16-ANC Prod-WH24P Survey Measured Vertical Map Map Depth Inclination Azimuth Depth +N/-S +E/-W Northing Easting (ft) (°) (°) (ft) (ft) (ft) (ft) (ft) Latitude Longitude 9,520.33 12.62 110.46 8,583.58 -2,383.87 2,281.95 5,972,979.81 666,436.42 70°19'56.513 N 148°38'59.39 W TIP 9,530.00 12.02 110.63 8,593.03 -2,384.59 2,283.88 5,972,979.13 666,438.36 70°19'56.506 N 148°38'59.33 W KOP 9,555.25 9.48 83.17 8,617.85 -2,385.27 2,288.41 5,972,978.55 666,442.91 70°19'56.499 N 148°38'59.20 W 9,585.53 12.85 38.41 8,647.61 -2,382.33 2,292.99 5,972,981.59 666,447.42 70° 19'56.528 N 148°38'59.06 W 9,611.33 13.11 14.32 8,672.77 -2,377.24 2,295.50 5,972,986.73 666,449.81 70°19'56.578 N 148°38'58.99 W 9,640.43 14.38 336.86 8,701.09 -2,370.71 2,294.89 5,972,993.25 666,449.06 70° 19'56.642 N 148°38'59.01 W 9,670.74 15.71 305.69 8,730.41 -2,364.84 2,290.07 5,972,999.00 666,444.12 70°19'56.700 N 148°38'59.15 W 9,702.30 19.66 277.30 8,760.52 -2,361.67 2,281.32 5,973,001.99 666,435.30 70° 19'56.731 N 148°38'59.40 W 9,735.13 25.75 288.38 8,790.81 -2,358.72 2,269.05 5,973,004.67 666,422.97 70° 19'56.760 N 148°38'59.76 W 9,765.23 32.74 300.90 8,817.08 -2,352.46 2,255.84 5,973,010.63 666,409.62 70° 19'56.822 N 148°39'0.15 W 9,795.09 41.06 304.53 8,840.94 -2,342.74 2,240.80 5,973,020.03 666,394.38 70°19'56.917 N 148°39'0.59 W 9,825.18 49.74 301.77 8,862.05 -2,331.07 2,222.86 5,973,031.30 666,376.19 70°19'57.032 N 148°39'1.11 W 9,857.80 59.78 302.13 8,880.85 -2,316.98 2,200.29 5,973,044.89 666,353.31 70°19'57.171 N 148°39'1.77 W 9,885.07 68.26 304.27 8,892.78 -2,303.56 2,179.81 5,973,057.86 666,332.54 70°19'57.303 N 148°39'2.37 W 9,915.09 78.76 304.38 8,901.29 -2,287.35 2,156.07 5,973,073.54 666,308.46 70°19'57.462 N 148°39'3.06 W 9,945.41 82.18 312.81 8,906.32 -2,268.71 2,132.73 5,973,091.67 666,284.72 70°19'57.646 N 148°39'3.74 W 9,971.46 80.86 322.18 8,910.17 -2,249.74 2,115.34 5,973,110.25 666,266.92 70°19'57.832 N 148°39'4.25 W 9,999.80 80.56 330.96 8,914.76 -2,226.42 2,099.95 5,973,133.22 666,251.02 70°19'58.062 N 148°39'4.70 W 10,039.69 81.86 333.30 8,920.85 -2,191.57 2,081.52 5,973,167.66 666,231.84 70°19'58.404 N 148°39'5.24 W 10,072.76 82.86 328.21 8,925.25 -2,162.99 2,065.51 5,973,195.88 666,215.21 70°19'58.686 N 148°39'5.70 W 10,099.68 83.10 324.00 8,928.54 -2,140.81 2,050.61 5,973,217.72 666,199.83 70°19'58.904 N 148°39'6.14 W 10,132.07 84.45 321.53 8,932.06 -2,115.18 2,031.13 5,973,242.92 666,179.79 70°19'59.156 N 148°39'6.71 W 10,160.86 84.99 326.48 8,934.71 -2,091.99 2,014.29 5,973,265.73 666,162.45 70°19'59.384 N 148°39'7.20 W 10,189.50 86.87 331.15 8,936.74 -2,067.56 1,999.50 5,973,289.83 666,147.13 70°19'59.624 N 148°39'7.63 W 10,219.51 85.11 336.23 8,938.84 -2,040.74 1,986.24 5,973,316.36 666,133.28 70°19'59.888 N 148°39'8.02 W 10,249.24 86.31 341.47 8,941.07 -2,013.10 1,975.55 5,973,343.76 666,121.99 70°20'0.160 N 148°39'8.33 W 10,289.34 85.13 346.20 8,944.06 -1,974.70 1,964.42 5,973,381.90 666,110.02 70°20'0.538 N 148°39'8.65 W 10,329.45 85.64 351.84 8,947.29 -1,935.47 1,956.80 5,973,420.95 666,101.56 70°20'0.924 N 148°39'8.88 W 10,359.27 85.67 356.37 8,949.55 -1,905.90 1,953.75 5,973,450.44 666,097.86 70°20'1.214 N 148°39'8.97 W 10,389.44 84.65 0.09 8,952.10 -1,875.86 1,952.82 5,973,480.46 666,096.27 70°20'1.510 N 148°39'8.99 W 10,419.46 82.64 359.28 8,955.42 -1,846.03 1,952.66 5,973,510.28 666,095.45 70°20'1.803 N 148°39'9.00 W 10,449.25 80.04 356.10 8,959.91 -1,816.61 1,951.48 5,973,539.66 666,093.63 70°20'2.093 N 148°39'9.03 W 10,479.20 78.66 352.20 8,965.44 -1,787.33 1,948.48 5,973,568.86 666,089.99 70°20'2.381 N 148°39'9.12 W 10,509.24 77.41 354.43 8,971.67 -1,758.15 1,945.06 5,973,597.96 666,085.93 70°20'2.668 N 148°39'9.22 W 10,539.64 75.07 357.43 8,978.90 -1,728.70 1,942.96 5,973,627.36 666,083.19 70°20'2.957 N 148°39'9.28 W 10,570.03 71.98 359.76 8,987.52 -1,699.57 1,942.24 5,973,656.46 666,081.83 70°20'3.244 N 148°39'9.30 W 10,600.90 69.88 2.50 8,997.61 -1,670.41 1,942.81 5,973,685.63 666,081.76 70°20'3.530 N 148°39'9.28 W 10,630.08 67.68 5.73 9,008.17 -1,643.28 1,944.75 5,973,712.79 666,083.11 70°20'3.797 N 148°39'9.23 W 10,659.44 67.18 9.28 9,019.44 -1,616.41 1,948.29 5,973,739.73 666,086.06 70°20'4.062 N 148°39'9.12 W 10,689.58 67.08 13.15 9,031.16 -1,589.17 1,953.69 5,973,767.07 666,090.87 70°20'4.329 N 148°39'8.96 W 10,719.96 65.81 15.09 9,043.30 -1,562.17 1,960.48 5,973,794.22 666,097.06 70°20'4.595 N 148°39'8.77 W 10,728.92 65.09 13.87 9,047.02 -1,554.28 1,962.52 5,973,802.15 666,098.93 70°20'4.673 N 148°39'8.71 W 10,781.00 65.09 13.87 9,068.96 -1,508.42 1,973.84 5,973,848.24 666,109.25 70°20'5.124 N 148°39'8.38 W TD-2 7/8" 12/7/2012 11:33:53AM Page 3 COMPASS 2003.16 Build 73 North America-ALASKA- BP Page 1 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E2OBCTD(2,095,370.00) Project:Prudhoe Bay Site: PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) ' 11/22/2012 00:00 - 01:00 1.00 MOB P PRE PREPARE RIG FOR RIG MOVE TO E-PAD. HAUL TRAILERS OFF LOCATION,ALL NON-MOBILE EQUIPMENT MOVED OFF LOCATION. 01:00 - 01:30 0.50 MOB P PRE PJSM FOR RIG MOVE. ASSIGN POSITIONS, DISCUSS HAZARDS AND COMMUNICATION. MOVE INTO POSITIONS,TEST EDC,ALL GOOD. 01:30 - 01:45 0.25 MOB P PRE MOVE RIG OFF OF D-29. SPOT RIG ON EDGE OF PAD AND MONITOR RIG WHILE WAITING ON SECURITY TO ARRIVE FROM DOYON 14 RIG MOVE. 01:45 - 02:30 0.75 MOB P PRE CONDUCT ROUTE DRIVE FROM D-PAD TO E-PAD WITH TOOLPUSHER AND DRILLER TO ENSURE ROUTE CLEAR FROM PREVIOUS RIG MOVE BY DOYON 14 02:30 - 03:00 0.50 MOB P PRE ROUTE DRIVE COMPLETE. PJSM ON MOVING RIG. SECURITY IN PLACE,ALL PERSONNEL SPOTTED IN POSITION. 03:00 - 07:30 4.50 MOB P PRE MOVE RIG FROM D-PAD TO E-PAD 07:30 - 21:00 13.50 MOB P PRE RIG SPOTTED ON SIDE OF E-PAD WHILE WAITING ON WIRELINE WORK TO BE COMPLETED. CONCURRENT WORK: GREASE CHOKE MANIFOLD,REEL HOSE AND SHAKER.CHANGE OUT SHAKER JACK LEG, FLEX HOSE ON ACCUMULATOR UNIT AND VALVE ON TEST PUMP. 21:00 - 00:00 3.00 MOB P PRE WAITING ON PAD PREP TO BE COMPLETED FOR RIG TO MOVE OVER. STAGE EQUIPMENT. MOVE SATELLITE CAMP TO OPPOSITE SIDE OF PAD. 11/23/2012 00:00 - 01:00 1.00 MOB P PRE WAIT ON FINAL PAD PREPARATION. CONDUCT INSPECTION,ALL GOOD. GET PERMIT SIGNED OFF BY PAD OPERATOR. 01:00 - 01:30 0.50 MOB P PRE PJSM WITH CREW,NORDIC FIELD SUPERINTENDENT,WSL,SCS. DISCUSS POSITIONS,TIGHT TOLERANCES,RIG MAT LOCATIONS ON CORNERS. 01:30 - 03:30 2.00 MOB P PRE MOVE RIG AROUND PAD TO E-20. POSITION RIG OVER WELL. RIG ACCEPT 0330 HRS. 03:30 - 06:00 2.50 RIGU P PRE PREPARE FOR RIG OPERATIONS 06:00 - 09:30 3.50 BOPSUR P PRE NIPPLE UP BOPE 09:30 - 10:00 0.50 BOPSUR P PRE RIG UP TEST EQUIPMENT AND FUNCTION TEST BOP AT REMOTE STATIONS. AOGCC REP BOB NOBLE WAIVED WITNESS OF THE BOPE TEST. 10:00 - 18:00 8.00 BOPSUR P PRE TEST BOPE/!BOP,SAFETY,CHOKE AND KILL LINE VALVES/2"COMBI/2 3/8"X 3 1/2"VBR/ 2"COMBI/BLIND SHEAR RAMS/ANNULAR/ INJECTOR 18:00 - 18:30 0.50 RIGU P PRE RIG EVACUATION DRILL WITH DAY CREW AND 3 RD PARTY PERSONAL Printed 12/17/2012 1:30:04PM Y . North America-ALASKA- BP Page 2 of 7 Operation Summary Report Common Well Name: E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E2OBCTD(2,095,370.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM 'Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat: 070°20'19.961"1 Long: 10148°40'06.017"W _ Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 18:30 - 19:15 0.75 RIGU P PRE HEAD UP WITH BAKER LEFT HANDED COIL CONNECTION. PRESSURE TEST TO 4K, PULL TEST TO 25K. GOOD TESTS. PULL COIL TO SIDE AND CIRCULATE COIL. 19:15 - 21:00 1.75 BOPSUR P PRE PRESSURE TEST DUAL FLAPPER CHECK VALVES AND NIGHTCAP. CLEAR AND CLEAN —RIG FLOOR, PREP TO MU NIPPLE MILLING BHA. 21:00 - 21:30 0.50 RIGU P PRE SIMULATE RIG FIRE AND CONDUCT RIG EVACUATION DRILL. CREW RESPONSE TIME LESS THAN 2 MINUTES TO MEET AT PRIMARY MUSTER AREA. CONDUCT AAR. 21:30 - 21:45 0.25 BOPSUR P PRE BLOW DOWN METHANOL IN TIGER TANK LINE,ALL CLEAR FROM RIG TO TIGER TANK. OPEN TREE VALVES,CHECK FOR PRESSURE AND FLOW FROM WELL IN ACCORDANCE WITH WELL PLAN CRITERIA FOR OPENING UP TO WELL. NO PRESSURE OR FLOW. REMOVE NIGHTCAP. WELL FLUID PACKED, STATIC. 21:45 - 22:15 0.50 DRILL _P PROD1 MU LEFT HANDED NIPPLE MILLING BHA. DIAMOND MILL GAUGE 3.80"GO,STRING MILL 3.79"GO.3.78"NO-GO. STAB ON WITH INJECTOR,PT QUICK TEST SUB. BREAK CIRCULATION,PRESSURE ON SHUT-IN GAUGE. DOWN ON PUMP,DOUBLE CHECK SURFACE LINES. ON WITH PUMPS AGAIN, STILL HAVE PRESSURE. CHECK LINE TO TIGER TANK,FROZEN AT COUPLING GOING OUTSIDE. SUSPECT FRESH WATER FROM BOP TEST WAS RELEASED WHEN CHOKE WAS OPENED TO CHECK WELL. 22:15 - 00:00 1.75 DRILL N PROD1 PUMP SMALL SPACER OF METHANOL BEHIND ICE PLUG WITH AIR PRESSURE ON BACK SIDE. PLACE STEAM ON LINE. MOBILIZE TRUNK HEATER TO WARM LINE. MONITOR WELL,WELL STATIC. 11/24/2012 00:00 - 01:00 1.00 DRILL N PROD1 WRAP PIPE WITH HERCULITE TO GET WARM AIR DOWN PIPE WHILE WAITING ON HEATER TRUNKS TO ARRIVE. WELL STATIC. 01:00 - 02:45 1.75 DRILL N PROD1 INSTALL HEATER TRUNK HALVES AROUND PIPE AND CONTINUE WITH ATTEMPT TO THAW LINE WITH HEATER TRUNK,STEAM LINE,AND METHANOL WITH AIR PRESSURE. WELL STATIC. LINE FINALLY THAWED, PUMPED METHANOL UNTIL FULLY CLEAR. CHASED WITH WARM KCL FROM PITS,ALL GOOD. 02:45 - 04:45 2.00 DRILL P PROD1 RIH WITH BHA PUMPING AT MIN RATE AND DISPLACING FREEZE PROTECT TO TIGER TANK. PUW 38K AT 9000'.CONTINUE RUNNING PAST 4 X NIPPLES WITH NO ISSUES. DOWN ON PUMPS,DRY TAG XN NIPPLE AT 9274'. PU,COME ON WITH PUMPS TO 2.5 BPM, FREE SPIN 1220 PSI. Printed 12/17/2012 1:30:04PM • North America -ALASKA- BP Page 3 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E2OBCTD(2,095,370 00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12.00:OOAM Rig Release: Rig Contractor. NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 04:45 - 06:30 1.75 DRILL P PROD1 BEGIN MILLING OPERATIONS AT 2.5 BPM, 1220 PSI AND SLOWLY MOVING INTO IT TO OBTAIN 4K WOB AND-1200 PSI DIFFERENTIAL PRESSURE. REAM THROUGH TWO TIMES. DOWN ON PUMPS AND DRY DRIFT THROUGH. 06:30 - 09:45 3.25 DRILL P PROD1 FLOW CHECK THE WELL/POOH TO BHA 09:45 - 10:15 0.50 DRILL P PROD1 FLOW CHECK AT BHA/REMOVE INJECTOR ti 10:15 - 11.00 0.75 DRILL P PROD1 LAY DOWN LEFT HANDED BHA/GAUGE MILL (3.76)UPPER STRING MILL(3.77)CALL TOWN PROCEED WITH OPERATIONS 11:00 - 12:00 1.00 DRILL P PROD1 COIL SLACK MANAGMENT/PUMP SLACK BACK/ 12:00 - 13:00 1.00 DRILL P PROD1 RIG UP AND CUT COIL 305' 13:00 - 14:00 1.00 DRILL P PROD1 MAKE UP CTC#7/PULL TEST TO 45K AND PRESSURE TEST(FAILURE) 14:00 - 14:45 0.75 DRILL P PROD1 CUT AND REHEAD/MAKE UP CTC#8/PULL TEST 44K AND PT 3950 PSI(GOOD TEST) 14:45 - 15:00 0.25 DRILL -P PROD? RIG UP AND PUMP E-LINE FOWARD 15:00 - 15:30 0.50 WHIP P WEXIT RIG UP AND PRESSURE TEST RISER AND .INJECTOR CONNECTIONS 250 PSI/3500 PSI (GOOD TEST) 15:30 - 16:45 1.25 WHIP P WEXIT MAKE UP WHIPSTOCK BHA 16:45 - 17:45 1.00 WHIP P WEXIT TEST DFCV (GOOD) 17:45 - 18:45 1.00 WHIP P WEXIT STAB ON WITH INJECTOR,PRESSURE TEST QUICK TEST SUB. BREAK CIRCULATION, GOOD RETURNS. 18:45 - 20:45 2.00 WHIP - P WEXIT RIH WITH WHIPSTOCK BHA. NO ISSUES RUNNING DOWN. 20:45 - 22:00 1.25 WHIP P WEXIT BEGIN TO LOG TIE-IN AT 9480'. TIE-IN TO PDC LOG MARKER AT 9540'WITH-6 5' CORRECTION. PICK UP TO 9400'AND LOG CCL FROM 9400'TO 9600'. PICK UP TO 9520'. CONFIRM COLLAR LOCATIONS FOR WHIPSTOCK SETTING DEPTH. _ 22:00 - 22:30 0.50 WHIP P WEXIT RIH TO 9542'. PICK UP TO NEUTRAL WEIGHT. CONFIRM WHIPSTOCK ORIENTATION AT 200° FOR LOW SIDE EXIT. CLOSE EDC, PRESSURE UP TO SET WHIPSTOCK PACKER. POSITIVE INDICATION PACKER SET AT 3020 PSI. SET DOWN 5K TO CONFIRM SET. PICK UP TO RELEASE FROM WHIPSTOCK. TOP OF WHIPSTOCK SET AT 9530'. FLOW CHECK WELL,ALL GOOD. 22:30 - 00:00 1.50 WHIP P WEXIT DISPLACE TO 8.6 PPF POWERPRO MUD SYSTEM. 11/25/2012 00:00 - 01:00 1.00 WHIP P WEXIT POH WITH WHIPSTOCK SETTING BHA. FLOW CHECK AT SURFACE. PJSM ON LAYING DOWN BHA AND PICKING UP MILLING ASSEMBLY. 01:00 - 02:15 1.25 STWHIP P WEXIT LAY DOWN BHA. RUNNING TOOL AND ROD IN GOOD SHAPE. MU 3.80"MILLING BHA. DIAMIOND WINDOW MILL AND STRING MILL BOTH 3.80"GO. WINDOW MILL 3.79"NO-GO. STAB ON,PRESSURE TEST QUICK TEST SUB. Printed 12/17/2012 1.30:04PM North America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E2OBCTD(2,095,370.00) Project:Prudhoe Bay Site: PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017 W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:15 - 04:30 2.25 STWHIP P WEXIT RIH WITH MILLING ASSEMBLY. DOWN ON PUMPS, DRY TAG TOP OF WHIPSTOCK AT UNCORRECTED DEPTH OF 9537'. PICK UP, e �: COME ON WITH PUMPS AND RE-TAG WHIPSTOCK AT UNCORRECTED DEPTH OF 9536'. CORRECT DEPTH TO 9530'. PICK UP AND OBTAIN SLOW PUMP RATES. FREE SPIN 2950 PSI AT 2 55 BPM. 04:30 - 07:00 2.50 STWHIP P WEXIT BEGIN MILLING OPERATIONS AT 2.50 BPM, 1 3005 PSI. TIME MILL FIRST FOOT. 3075 PSI AT 2.5 BPM,WOB 1.5K. SLOWLY INCREASE WOB TO 2.6K WITH 3140-3160 PSI AT 2.55 V BPM AFTER THE FIRST 12. �r 07:00 - 12:00 5.00 STWHIP P WEXIT CONTINUE WITH MILLING OPERATIONS. l44.) WOB VARYING BETWEEN 1.3-4.2K. FREE }1 SPIN 2700 PSI AT 2.5 BPM. PRESSURE 1 D VARYING 110-240 PSI WHILE MILLING. 12:00 - 15:30 3.50 STWHIP P WEXIT MILLING OPERATIONS AT 2.5 BPM,2830-3000 PSI. EXITED WINDOW AT 9538'. CONTINUE MILLING PER WELL PLAN. TIME MILL LAST FOOT. 15:30 - 19:15 3.75 STWHIP P WEXIT TIME MILL FIRST TWO FEET INTO -- FORMATION AND CONTINUE TO DRILL INTO NEW FORMATION TO 9550'. PICK BACK UP TO REAM THROUGH WINDOW TWO TIMES. BOTTOMS UP SHOWS SILT/SANDSTONE DRY DRIFT THROUGH WINDOW WITH NO ISSUES. PULL INTO WINDOW,FLOW CHECK. NO FLOW. 19:15 - 21:00 1.75 STWHIP P WEXIT POH WITH MILLING ASSEMBLY. FLOW CHECK AT SURFACE. PJSM ON LAYING DOWN BHA AND JETTING STACK. CONCURRENT OPS,COMPLETE LOADING PIPE AND BEGIN STRAPPING AND DRIFTING. 21:00 - 21:45 0.75 STWHIP P WEXIT POP OFF,BLOW DOWN BHA. LD MILLING BHA. WINDOW MILL AND STRING MILL GAUGE AT 3.79"GO,WINDOW MILL GAUGE AT3.78"NO GO. 21:45 - 22:30 0.75 BOPSUR P WEXIT JET BOP STACK, INSPECT TREE BOLTS. ONE LOOSE,CALL OUT VALVE SHOP TO RE-TORQUE. POP OFF WITH INJECTOR. 22:30 - 23:15 0.75 DRILL P PROD1 MU BUILD BHA WITH HYCALOG4.25" BI-CENTER BIT WITH TORQUE CONTROL CUTTERS,2-7/8"ULTRA LOW SPEED MOTOR WITH 2.83°BEND(AKO). STAB ON WITH INJECTOR, PRESSURE TEST QUICK TEST SUB. VALVE SHOP ON LOCATION TO TIGHTEN BOLT AND CHECK TORQUE ON REST. 23:15 - 00:00 0.75 DRILL P PROD1 RIH WITH DRILLING ASSEMBLY AND SHALLOW HOLE TEST MWD EQUIPMENT. CONTINUE TO RIH. 11/26/2012 00:00 - 02:15 2.25 DRILL P PROD1 RIH WITH 4.25"BUILD ASSEMBLY. OBTAIN SLOW PUMP RATES. MW IN AND OUT 8.6 PPG. LOG TIE-IN WITH-6.5'CORRECTION. Printed 12/17/2012 1:30:04PM North America -ALASKA- BP Page 5 of 7 Operation Summary Report • Common Well Name: E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E20BCTD(2,095,370.00) Project:Prudhoe Bay Site: PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 02:15 - 05:30 3.25 DRILL P PROD1 FREE SPIN 3040 PSI AT 2.6 BPM. DRILL AHEAD IN BUILD SECTION FROM 9550'. -2.6 BPM,3000-3245 PSI,.6-2.0K WOB,10.1 ECD, MW IN AND OUT 8.65 PPG -DIFFICULTY GETTING PROPER KICK OFF, WORKING ON INCLINATION 05:30 - 07:00 1.50 DRILL P PROD1 GEO REQUESTS TO RE-LOG TIE-IN FOR ZONAL MARKER. PULL UP HOLE TO 9470' AND LOG TIE-IN WITH+2'CORRECTION. 07:00 - 11:15 4.25 DRILL P PROD1 OBTAIN SLOW PUMP RATES. DRILL AHEAD FROM 9650'. FREE SPIN 2950 PSI AT 2.6 BPM. ---------- MW IN AND OUT 8.65 PPG. 11:15 - 12:00 0.75 DRILL P PROD1 WIPER TRIP TO WINDOW. NO ISSUES TO WINDOW OR BACK TO BOTTOM. 12:00 - 18:00 6.00 DRILL P PROD1 DRILL AHEAD FROM 9800'. FREE SPIN 2975 PSI AT 2.6 BPM. MW IN AND OUT 8.68 PPG. COMPLETE DRILLING TO END OF BUILD SECTION AT 10,000'. FLOW CHECK WELL,NO FLOW. 18:00 - 21:15 3.25 DRILL _ P PROD1 POH TO WINDOW. FLOW CHECK AT WINDOW. NO FLOW. CONTINUE POH. LOG CCL FROM 9000'TO 9400' DUE TO CHANGE IN LINER PROGRAM. CONTINUE TO POH TO SURFACE AND FLOW CHECK AT SURFACE WHILE CONDUCTING PJSM ON LAYING DOWN BHA. 21:15 - 23:15 2.00 DRILL P PROD1 LD BHA WITH NO ISSUES. BIT GRADE 2-2-CT. CHANGE OUT GAMMA SUB,MOTOR AND BIT. MU TO COIL CONNECTOR. STAB ON, PRESSURE TEST QUICK TEST SUB. 23:15 - 00:00 0.75 DRILL - P PROD1 RIH WITH 4.25"BI-CENTER BIT ON 3-1/8" ✓ ULTRA LOW SPEED MOTOR WITH 1.52°BEND (AKO). 11/27/2012 00:00 - 01:45 1.75 DRILL P PROD1 RIH WITH 4.25"LATERAL ASSEMBLY. LOG TIE-IN WITH-7.5'CORRECTION. OBTAIN SLOW PUMP RATES. RIH TO BOTTOM. 01:45 - 06:00 4.25 DRILL P PROD1 DRILL AHEAD IN LATERAL SECTION. FREE SPIN 3080 PSI AT 2.6 BPM. -2.6 BPM,3260-3400 PSI,ECD 10.3 PPG,WOB .94-2.5K,MW IN AND OUT 8.75 PPG -INCREASE IN DIFFERENTIAL PRESSURE,PU TO CHECK PARAMETERS. PUW INCREASE FROM 34K TO 37K. CONDUCT BHA WIPER TRIP. RUN BACK DOWN WITH NO ISSUES. DRILL AHEAD ANOTHER 10'AND PU FOR DIRECTIONAL CORRECTION,PU CLEAN. -BEGINNING TO SEE SOME STACK DOWN AT 10,156',PRESSURES OKAY -PREDOMINANT CUTTINGS COMING BACK FROM 10,000'TO 10,100'70%CHERT. PREDOMINANTLY SAND FROM 10,150' SAMPLE. GEO INTERPRETATION SHOWS MAJOR FAULT CROSSED AT 9880'. -BHA WIPER AT 10,200'DRILL TO 10250' 06:00 - 07:15 1.25 DRILL P PROD1 WIPER TRIP FROM 10250'TO 9545'WITH NO PROBLEMS/OBTAIN SPR 07:15 - 11:45 4.50 DRILL P PROD1 DRILL AHEAD FROM 10250'TO 10425' 2.6 BPM=3140 FS 11:45 - 13:00 1.25 DRILL P PROD1 SHORT-TRIP FROM BOTTOM TO WINDOW. Printed 12/17/2012 1:30:04PM North America-ALASKA- BP Page 6 of 7 Operation Summary Report Common Well Name E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E20BCTD(2,095,370.00) Project:Prudhoe Bay Site: PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:OOAM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 014.8°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 13:00 - 15:30 2.50 DRILL P PROD1 WAIT FOR WSL-CHANGE OUT TO BE COMPLETED.PVT=243BBLS. 15:30 - 15:45 0.25 DRILL P PROD1 START RUNNING BACK IN HOLE(PVT= 243BBLS). 15:45 - 17:15 1.50 DRILL P PROD1 LOG FOR TIE-IN.APPLY+2.5'DEPTH CORRECTION,AND RUN BACK TO TD. 17:15 - 20:15 3.00 DRILL P PROD1 CONTINUE DRILLING AHEAD WITH LOW ROP. ROP=20-40 FPH,WOB=2.75 K LBS,CIRC PRESSURE=3,505 PSI @ 2.6BPM. MM IN=2.58 BPM / MM OUT=2.59 BPM MW IN=8.81 PPG / MW OUT=8.81 PPG / ECD= 10.30 PPG PVT=238 BBLS, LOSSES ARE-2BBLS/HR. IA=500 PSI 20:15 - 21:50 1.58 DRILL P PROD1 DRILL TO 10,550'AND CONDUCT WIPER TO WINDOW. 21:50 - 23:30 1.67 DRILL P PROD1 DRILL AHEAD.NOTICE INDICATION THAT THE BIT IS WEARING OUT(LOW ROP AND LOW DLS). 23:30 - 00:00 0.50 DRILL - P PROD1 AT AROUND 10,600'ROP DROPS TO OFT/HR (BIT DOESN'T STALL).TRY TO GET THE BIT TO BITE BY VARYING PUMPRATES AND WOB. 11/28/2012 00:00 - 00:30 0.50 DRILL P PROD1 MANAGE TO ENGAGE THE BIT AGAIN AND SEE A VAST IMPROVEMENT IN ROP UP TO MORE THAN 150FT/HR.DRILL TO 10,660'. 00:30 - 01:30 1.00 DRILL P PROD1 PICK UP OFF BOTTOM AND CIRCULATE BOTTOMS UP TO ALLOW GEO TO ANALYZE THE SAMPLE. 01:30 - 01:50 0.33 DRILL P PROD1 GEO CALLS AND REPORTS MINOR AMOUNT OF MHO IN 10,680'-SAMPLE.RECEIVE PERMISSION TO DRILL AHEAD TO 10,700', CIRCULATE UP A FURTHER SAMPLE AND ANALYZE FOR MHO AGAIN. 01:50 - 02:30 0.67 DRILL P PROD1 BACK TO BOTTOM AND DRILL AHEAD. 02:30 - 03:30 1.00 DRILL P PROD1 JUST BEFORE 10,700'GEO CALLS TO CONFIRM THAT WE CAN DRILL TO TD -(10,771'). 03:30 - 04:00 0.50 DRILL P PROD1 GEO CALLS AND ASKS TO DRILL AHEAD TO 10,780'. 04:00 - 05:00 1.00 DRILL P PROD1 DRILL TO 10,780'AND CALL TD. PICK UP AT 20FT/MIN PERFORMING FINAL WIPER-TRIP TOP WINDOW. 05:00 - 05:15 0.25 DRILL P PROD1 PULL TO 9,530',STOP PUMPS AND PULL INTO WINDOW. 05:15 - 07:15 2.00 DRILL P PROD1 PICK UP LOG FOR TIE-IN ON WADS FROM 9,490'TO 9527'SAG RIVER FORMATION. DEPTH CORRECTION+3'. RIH TO TD.CONFIRM 10,781.6'. FLOW CHECK. 07:15 - 08:15 1.00 DRILL P PROD1 POH.LAY 30 BBL LINER RUNNING PILL ON OPEN HOLE.POH TO TOP OF WINDOW. _ 08:15 - 08:45 0.50 DRILL P PROD1 OPEN EDC.CIRCULATE ACROSS THE WHIPSTOCK AREA. 08:45 - 09:00 0.25 DRILL P PROD1 POH TO 8928'.PAINT YELLOW FLAG.EOP 8442' POH TO 7678'. PAINT RED FLAG. EOP 7592' Printed 12/17/2012 1:30:04PM North America -ALASKA- BP Page 7 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: DRL-ONSHORE(DON) Start Date: 11/22/2012 End Date: 11/28/2012 X3-01129-C:E2OBCTD(2,095,370.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017'W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 09:00 - 10:30 1.50 DRILL P PROD1 POH JET TO SURFACE.RIH TO 300'.CLOSE EDC. FLOW CHECK. POH AND TAG INJECTOR. 10:30 - 11:00 0.50 DRILL P PROD1 LAY DOWN BHA#5.BIT GRADED AT 5-3-BT-A-X-I-CT-TD 11:00 - 11:15 0.25 DRILL P PROD1 FUNCTION BOP_FROM DRILLER'CONSOLE. 11:15 - 11:45 0.50 DRILL P PROD1 PERFORM E-LINE SLACK AND COIL CHROME MANAGEMENT.REMOVE BAKER COIL HEAD. REBOOT END OF E-LINE.MAKE UP 2 JOINTS 2 3/8"TUBING FOR E-LINE SLACK. 11:45 - 13:15 1.50 DRILL P PROD1 STAB ONTO WELL.FILL COIL WITH FRESH WATER.PUMP OUT COIL.CUT 269'E-LINE. CUT OFF 100'OF COIL. 13:15 - 14:30 1.25 DRILL P PROD1 MAKE UP BAKER TT COIL CONNECTOR. PULL TEST TO 43K.PRESSURE TEST TO 3800 'PSI. 14:30 - 16:00 1.50 DRILL P PROD1 LAUNCH 3/4"DRIFT BALL. PUMP AROUND. BALL RECOVERED. PRESSURE TEST THE LUBRICATOR. - 'DISCONNECT INJECTOR AND SET BACK ON STAND. • Printed 12/17/2012 1:30:04PM North America -ALASKA- BP Page 1 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 1X3-01129-C:E2OBCTD(1,094,193.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017'9 Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 11/28/2012 16:00 - 17:30 1.50 CASING P RUNPRD RIG UP TO RUN 3-114"6.6#L-80 STL LINER. COMFORM TOOLS AND AND LINER JOINTS IN RUNNING ORDER. 17:30 - 18:00 0.50 CASING P RUNPRD MAKE UP 2 7/8"INDEXING GUIDE SHOE AND SHOE TRACK. 18:00 - 19:00 1.00 CASING P RUNPRD DISCUSS JOURNEY MANAGEMENT TO ENSURE THAT CREW CHANGE IS CONDUCTED AS PER PHASE 2 REQUIREMENTS(I.E.DRIVING IN CONVOY ONLY). PERFORM GOOD HANDOVER BETWEEN SHIFTS,SINCE CREWCHANGE FELL IN THE MIDDLE OF MU LINER.DRILLER AND WSL COUNT AND RE-COUNT LINER IN THE PIPESHED(SHOETRACK+7xJOINTS 3-1/4" LINER HAVE BEEN MU SO FAR). CONDUCT PJSM BEFORE CONTINUING TO MU LINER. 19:00 - 20:15 1.25 CASING P RUNPRD CONTINUE MAKING UP 3-1/4"LINER JOINTS TO JOINT#31. FILL LINER HALF-WAY THROUGH AT JOINT USING THE RIGFLOOR WATER-HOSE. Printed 12/17/2012 1:30:20PM North America -ALASKA- BP • Page 2 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 X3-01129-C:E20BCTD(1,094,193.00) Project:Prudhoe Bay Site: PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:OOAM Rig Release: Rig Contractor NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:15 - 20:45 0.50 CASING P RUNPRD ****CONDUCT COMPLEX KICK WHILE TRIPPING DRILL**** CONDUCTED A TABLETOP DRILL AND DISCUSSED SHUTTING IN THE WELL WHILE MU LINER.CREW CORRECTLY RAN THROUGH THE PROCEDURE OF MU SAFETY JOINT WITH FLOOR SAFETY VALVE, LOWERING SAFETY JOINT ACROSS BOP AND CLOSE UPPER COMBIS,SAFETY VALVE AND HCR-VALVE. IT WAS THEN DISCUSSED WHAT WOULD NEED TO BE DONE IF THE UPPER COMBIS WOULD FAIL TO FUNCTION OR ONLY CLOSE HALF WAY.THE CREW ANSWERED THAT THE REASON FOR THAT COULD ONLY BE A MECHANICAL OR HYDRAULIC LEAK. IN THE FIRST CASE,THE LOWER COMBIS WOULD NEED TO BE CLOSED, IN THE LATTER CASE THE MOTORMAN AT THE KOOMEY OR THE ROUSTABOUT IN THE CELLAR SHOULD IDENTIFY ANY LEAK. IN CASE OF A LEAK THE UPPER COMBIS'S MANUAL VALVE ON THE KOOMEY WOULD BE POSITIONED IN "NEUTRAL"TO ISOLATE THE LINE. FOLLOWING THAT,THE LOWER COMBIS WOULD BE CLOSED. THEREAFTER LEAKS AT DIFFERENT KOOMEY LOCATIONS AND HOW TO ISOLATE THEM WERE DISCUSSED.THE OPTION OF A TOTAL LOSS OF HYDRAULIC OIL WAS REVIEWED AND THE MITIGATION OF USING STAND-BYE HYDRAULIC OIL BARREL WAS DISCUSSED. LAST,THE EXPECTED PRESSURES AT THE KOOMEY-MANIFOLD AND THE BOTTLES WERE REVIEWED AFTER FUNCTIONING THE HCR,ONE AND TWO RAMS. FOLLOWING THAT,THE WSL PROMPTED A SCENARIO WHERE THE FLOOR SAFETY VALVE WOULD START LEAKING.THE CREW CORRECTLY ANSWERED TO INSTALL THE SECOND SAFETY VALVE ON TOP OF THE LEAKING VALVE.THE WSL AND DRILLER THEN WENT AND ENSURED THAT ALL CROSS-OVERS REQUIRED FOR MAKING UP A SECOND SAFETY VALVE WERE READY TO GO. 20:45 - 22:15 1.50 CASING P RUNPRD COMPLETE MAKING UP 40x JOINTS 3-1/4" IJNER AND 1 Ix JOINTS 3-1/2"LINER. INSTALL DEPLOYMENT-SLEEVE. MU BHA#6 WITH SELRT, DISCONNECT AND 6x JOINTS PI-16. NOTICE THAT PH6-JOINT#3 (32.67')HAS A BAD THREAD AND REPLACE WITH JOINT#7(31.38').COMPLETE MU BHA #6.COUNT PIPE LEFT-OVER IN PIPESHED, ALL NUMBERS MATCH. Printed 12/17/2012 1:30:20PM North America -ALASKA- BP a Page 3 of 7 Operation Summary Report Common Well Name: E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 X3-01129-C:E2OBCTD(1,094,193.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 22:15 - 23:10 0.92 CASING P RUNPRD CLEAR RIGFLOOR FROM LINER HANDLING EQUIPMENT. STAB ON INJECTOR AND PRESSURE-TEST QTS TO 250PSI/5MINS AND 3,500PSI/5MINS. FILL UP LINER. 23:10 - 00:00 0.83 CASING P RUNPRD START RIH WITH LINER AND BHA#6. 11/29/2012 00:00 - 00:40 0.67 CASING P RUNPRD CONTINUE RIH WITH LINER.SEE WINDOW FLAG AT 9,335'(-9'OF DEPTH)AND RECORD 37K LBS PUW. 00:40 - 01:10 0.50 CASING P RUNPRD CONTINUE RUNNING LINER TO TD. LOST IN TOTAL 7BBLS DURING MU/ RUNNING LINER. 01:10 - 01:30 0.33 CASING P RUNPRD TAG UP TD AT 10,789'(UNCORRECTED).PICK UP AND RE-TAG TD,STACK DOWN 10K LBS. 01:30 - 02:00 0.50 CASING P RUNPRD DROP 5/8"BALL AND PUMP AWAY AT 2BPM/ 3,000PSI CIRC PRESSURE. CALL OUT SLB CEMENTERS. 02:00 - 02:15 0.25 CASING P RUNPRD BALL LANDS ON SEAT.43BBLS PUMPED AWAY. PRESSURE UP TO 4,400PSI AND RELEASE FROM LINER. PICK UP 5'TO CONFIRM THAT LINER IS FREE. SIT DOWN AND STACK DOWN 10K LBS WEIGHT AT 10,789'. 02:15 - 02:45 0.50 CASING P RUNPRD LINE UP TO KCL AND START DISPLACING WELL WITH 3,091 PSI CIRC PRESSURE AT 2.6BPM. SHORTLY AFTER CHANGING OVER TO KCL, NOTICE LOSSES.MM-IN 2.48BPM/MM OUT 1.33BPM/1,985PSI CIRC PRESSURE(DID NOT HAVE LOSSES WHEN DRILLING, TRIPPING OR MU/RUNNING LINER). 02:45 - 03:00 0.25 CASING P RUNPRD AT 77BBLS KCL PUMPED,LOSSES START CURING UP:MM-IN 2.6BPM/MM OUT 1.7BPM/ 1,926PSI CIRC PRESSURE. 03:00 - 03:20 0.33 CASING P RUNPRD MM-IN 2.60BPM/MM OUT 2.3BPM/1,915PSI CIRC PRESSURE. 03:20 - 04:00 0.67 CASING P RUNPRD MM-IN 2.61 BPM/MM OUT 2.41 BPM/1,439PSI CIRC PRESSURE. 04:00 - 05:00 1.00 CASING P RUNPRD MM-IN 2.62BPM/MM OUT 2.46BPM/1,450PSI CIRC PRESSURE. COMPLETE DISPLACING WELL TO KCL. OBSERVE 620PS1 CIRC PRESSURE WHEN CIRCULATING KCL AT 1.5BPM. 05:00 - 07:00 2.00 CEMT P RUNPRD SPOT AND RIG UP SLB CEMENTERS. MM-IN 1.5BPM/MM OUT 1.41 BPM/670PSI CIRC PRESSURE. 07:00 - 07:40 0.67 CEMT P RUNPRD HOLD PSJM WITH ALL CREWS INVOLVED BEFORE PRESSURE-TESTING CEMENT LINES. 07:40 - 08:00 0.33 CHEM P RUNPRD BLOW DOWN CEMENT SURFACE LINE WITH AIR BEFORE PUSHING FLUIDS TO CEMENTERS. Printed 12/17/2012 1:30:20PM North America -ALASKA- BP Page 4 of 7 Operation Summary Report Common Well Name: E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 X3-01129-C:E2OBCTD(1,094,193.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time:11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:/Lat:070°2019.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 08:00 - 09:30 1.50 CEMT N SFAL 10,789.00 RUNPRD AIR CANNOT BE BLOWN TO CEMENTERS FROM THE RIG.CEMENTERS VERIFY THE LINES ARE CLEAR. IDENTIFY THAT THE RIG'S CEMENTING STAND PIPE IS FROZEN. COMMENCE THAWING ACTIVITIES. CIRCULATE AT 0.75 BPM.LOSSES AT 4.8 BPH 09:30 - 11:15 1.75 CEMT N RUNPRD PRESSURE TEST CEMENTING LINES FROM RIG TO CEMENTING UNIT WITH LVT (MINERAL OIL)LOW PRESSURE TEST 246 PSI. HIGH PRESSURE TEST 6019 PSI.BLEED OFF PRESSURE. 11:15 - 14:00 2.75 CEMT N RUNPRD PJSM FOR CEMENT JOB WITH NORDIC CREW,SLB COIL CREW,SLB CEMENTERS AND WSL. BATCH MIX 15 1 BBL15..82R.G._C.LA.SS'G' CEMENT_ 114°A.- PUMP PUMP CEMENT TO COIL.STOP PUMPING. ISOLATE CEMENTERS,BLOW DOWN CEMENTING LINES. SWAP OVER TO COIL.PUMP 69.5 BBL AT 2 BPM. STOP PUMPING WITH 2 BBL CEMENT IN COIL. CEMENT IS AT THE SHOE. PICK UP 13'AND RELEASE THE"PEE WEE" DART.SET BACK DOWN AND LAUNCH PEE WEE DART.PRESSURE UP TO 1200 PSI. PICK UP TO PRESSURE DROP OFF. CIRCULATE OUT 2 BBL CEMENT AND 3 BBL KCL THROUGH SIDE EXHAUST. SET BACK DOWN.PRESSURE UP TO LAUNCH LINER WIPER PLUG. GOOD INDICATION OF WIPER PLUG SHEAR AT 3150 PSI. PUMP WIPER PLUG AT 1.3 BPM WITH 2100 PSI. CEMENT IN PLACE AT 13:40 HRS. BUMP PLUG WITH 13 BBL AWAY. 13.7 BBL CEMENT BEHIND THE LINER. OPEN CHOKE TO TEST FLOATS.FLOATS HELD. PRESSURE UP TO 1100 PSI AND UNSTING FROM LINER DEPLOYMENT SLEEVE. PICK UP TO 10,730',CIRCULATE 5 BBL BIOZAN. 14:00 - 16:00 2.00 CEMT N RUNPRD POH AT 100FPM. PUMPING AT 1 BPM. FLOW CHECK AT 250'. 16:00 - 16:30 0.50 CEMT N RUNPRD DISCONNECT INJECTOR FROM WELL. LAY DOWN LINER RUNNING BHA. 16:30 - 19:00 2.50 EVAL N WAIT 10,789.00 OTHCMP WAIT ON MEMORY LOG TOOL AND ENGINEER. ENGINEER FINISHING JOB ON ANOTHER WELL. 19:00 - 20:15 1.25 EVAL P OTHCMP REVIEW CLEAN-OUT/LOGGING BHA(BHA#7) WITH THE OBJECTIVE OF NOT TO RUN THE 1-1/4"CSH.CALL BAKER TO LOCATE EQUIPMENT,REVIEW ID'S AND OD'S. Printed 12/17/2012 1:30:20PM North America -ALASKA- BP Page 5 of 7 Operation Summary Report Common Well Name. E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 `X3-01129-C:E2OBCTD(1,094,193.00) Project:Prudhoe Bay Site: PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor:NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 20:15 - 20:30 0.25 EVAL P OTHCMP TRUCK DRIVER REPORTS A SMALL LEAK ON A CH2-TRUCK COMING FROM TRUCK'S DRIVETRAIN.WSL CALLED CTD SUPERINTENDENT AND ALSO SPILL-RESPONSE TO REPORT<1 CUP OF ENGINE OIL CAUGHT IN THE TRUCKS SECONDARY CONTAINMENT PLUS A FEW DROPS(AS MUCH AS A TABLE SPOON MAYBE)ON THE GROUND. 20:30 - 21:15 0.75 EVAL P OTHCMP DFQID TF O MAKE UP THE CLEAN-OUT/ LOGGING BHA WIT1iAN INTERNAL CTC,2X JOINTS OF 2-1/16"CSH, DUAL BPV, HI-LOAD DISC,CIRC VALVE,LOGGING CARRIER, 2X JOINTS OF 1-1/4"CSH,MUDMOTOR AND CLEAN-OUT MILL.CALL BTT TO BRING OUT REQUIRED EQUIPMENT. 21:15 - 21:30 0.25 EVAL • P OTHCMP HOLD PJSM WITH CREW BEFORE MU INTERNAL DIMPLE CTC. 21:30 - 22:00 0.50 EVAL P OTHCMP PICK UP INJECTOR AND CUT OFF CTC,MU NEW CTC. 22:00 - 22:30 0.50 EVAL P OTHCMP PULL-TEST AND PRESSURE-TEST CTC. • 22:30 - 23:00 0.50 EVAL P OTHCMP -GAUGE CLEAN-OUT MILL(2.75"GO/2.74" NO-GO).MU BHA#7 WITH MILL,MUDMOTOR (� • AND 1-1/4"CSH WHILE LOGGING ENGINEER '(uNv IS PREPARING LOGGING TOOLS. RECIEVE CONFIRMATION FROM SLB THAT CEMENT HAS REACHED 500PSI COMPRESSIVE STRENGTH. 23:00 - 23:30 0.50 EVAL P OTHCMP HOLD PJSM BEFORE LIFTING UP LOGGING TOOLS AND RADIOACTIVE SOURCE TO RIGFLOOR. 23:30 - 00:00 0.50 EVAL P. OTHCMP COMPLETE MU BHA AND STAB ON INJECTOR. 11/30/2012 00:00 - 00:20 0.33 EVAL P OTHCMP PRESSURE-TEST QTS TO 300PSI/5MINS AND 4,500PSI/5MINS. 00:20 - 01:45 1.42 EVAL P OTHCMP START RIH WITH BHA#7. PVT=269BBLS 01:45 - 02:10 0.42 EVAL P OTHCMP START SEEING CEMENT RETURNS(PH= 11.5). 02:10 - 02:45 0.58 EVAL P OTHCMP START PERFORMING MEMORY CNL-GR-CCL LOGGING OPERATIONS.LOG DOWN FROM 9,250'AT 30FPM. 02:45 - 03:00 0.25 EVAL P OTHCMP LINE UP AND PUMP TO PERFORATING PILL. MM IN:1.80BPM/8.41 PPG,MM OUT:2.00BPM /9.20PPG. / 03:00 - 03:15 0.25 EVAL P OTHCMP TAG THE 3-3/16"x 2-7/8"STL X-OVER AT 10,756.3'.HAVE NOT NOTICED ANY TIGHT SPOTS WHEN RIH,NO REAMING REQUIRED. PU AND PAINT RED/WHITE FLAG AT 10,700' BIT-DEPTH(10,540'EOP-DEPTH). 03:15 - 03:45 0.50 EVAL P OTHCMP LOG UPWARDS AT 60FPM AND LAY IN 35BBLS PERFORATION PILL. 03:45 - 04:00 0.25 EVAL P OTHCMP PULL UP TO 9,250'AND CONCLUDE LOGGING OPS. 04:00 - 05:20 1.33 EVAL P OTHCMP POOH PUMPING KCL AT 55FPM,STILL SEEING BIOZAN IN RETURNS AND PH=12. MM IN: 1.65BPM/8.33PPG,MM OUT: 1.37BPM /8.41 PPG. Printed 12/17/2012 1:30:20PM North America -ALASKA- BP i Page 6 of 7 Operation Summary Report Common Well Name: E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 'X3-01129-C:E2OBCTD(1,094,193.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor: NORDIC CALISTA UWI:/Lat: 070°20'19.961"1 Long: 0148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT NPT Depth Phase Description of Operations (hr) (ft) 05:20 - 07:00 1.67 EVAL P OTHCMP POOH AT 55 FPM.NOTICE THAT PH HAS DROPPED<11. MM IN: 1.63 BPM/8.3PPG, MM OUT: 1.34 BPM /8.40PG. FLOW CHECK AT 268' 07:00 - 07:45 0.75 EVAL P OTHCMP DISCONNECT INJECTOR. -LAY DOWN BHA AND LOGGING TOOLS. MILL WORN FROM 2.75"OD TO 2.74"OD. GOOD CONDITION. REUSABLE. 07:45 - 08:15 0.50 EVAL P OTHCMP WASH OUT THE BOP WITH JETTING TOOL. POH AND LAY DOWN JETTING TOOL. FUNCTION AND GREASE ALL VALVES ON THE TREE. 08:15 - 10:30 2.25 PERFOB P OTHCMP TEST LINER LAP. INSTALL LUBRICATOR CAP. RIG UP TO PUMP DOWN THE KILL LINE. PRESSURE UP TO 300 PSI FOR 5 MINUTES. LOW PRESSURE. PRESSURE UP TO 2415 PSI FOR 30 MINUTES. HIGH PRESSURE. PRESSURE DROPPED OFF TO 2387 PSI(28) IN THE FIRST 15 MINUTES. PRESSURE DROPPED OFF TO 2379 PSI(8)IN THE SECOND 15 MINUTES. CALCULATED VOLUME 1.75 BBL TO PRESSURE UP.PUMPED 2 BBL.BLEED BACK 2 BBL. APPROVAL RECEIVED FROM WTL TO PROCEED. SEE ATTACHED PRESSURE CHART. 10:30 - 12:30 2.00 PERFOB P OTHCMP RIG UP TO RUN 2"PERFORATING GUNS. MAKE UP RUNNING TOOLS. PICK UP 6 GUN SECTIONS OF 2" "POWER JET 2006"HMX,6.5 GRAM WITH 6 SPF AND 60 DEG PHASING. MAKE UP SLB CT E-FIRE HEAD. TOTAL LENGTH OF GUN BHA 135.55' 12:30 - 14:30 2.00 PERFOB P OTHCMP MAKE UP TCP GUN BHA TO 2-3/8"DIMPLE COIL CONNECTOR WITH 1-1/2"MT THREAD CONNECTION. CONNECT INJECTOR HEAD.TEST QUICK TEST CONNECTOR. RIG TCP GUNS ON COIL. RIH AT 90 FPM.PUMP AT 0.30 GPM. TIE IN AT EOP FLAG. 14:30 - 15:00 0.50 PERFOB P OTHCMP TIE IN AT EOP FLAG NO CORRECTION. RIH AND TAG AT 2-7/8"LATCH COLLAR AT 10,761'. PICK UP 10,733'.PERFORM E-FIRE PRESSURE SEQUENCE. PICK UP AND FIRE GUNS ON THE FLY AT 10,730' CLEAR INDICATION OF GUNS FIRING. NOTED A 2 BBL FLUID LOSS. 15:00 - 15:30 0.50 PERFOB P OTHCMP POH WITH TCP GUNS AT 49 FPM PUMP AT 0.72 GPM WITH 231 PSI POH TO 9000' FLOW CHECK. Printed 12/17/2012 1:30:20PM • North America -ALASKA- BP ! Page 7 of 7 Operation Summary Report Common Well Name:E-20 AFE No Event Type: COM-ONSHORE(CON) Start Date: 11/28/2012 End Date: 12/1/2012 'X3-01129-C:E2OBCTD(1,094,193.00) Project:Prudhoe Bay Site:PB E Pad Rig Name/No.: NORDIC 1 Spud Date/Time: 11/27/1981 12:00:00AM Rig Release: Rig Contractor NORDIC CALISTA UWI:/Lat:070°20'19.961"1 Long: 10148°40'06.017"W Active Datum:ORIG KELLY BUSHING @60.50ft(above Mean Sea Level) Date From-To Hrs Task Code NPT ! NPT Depth Phase Description of Operations (hr) (ft) 15:30 - 15:45 0.25 PERFOB P OTHCMP FLOW CHECK WELL AT 9000'.NO FLOW 15:45 - 17:30 1.75 PERFOB P OTHCMP POH WITH TCP GUNS AT 90 FPM PUMP AT 1.0 GPM WITH 560 PSI POH TO 594' CORRECT FILL. NO LOSSES 17:30 - 17:45 0.25 PERFOB P OTHCMP .FLOW CHECK WELL AT 594'.NO FLOW. 17:45 - 18:45 1.00 PERFOB P OTHCMP POR FROM 594'TO SURFACE. REMOVE INJECTOR AND STAND BACK. LAY DOWN FIRED TCP GUNS. ALL GUNS FIRED. 18:45 - 19:45 1.00 BOPSUR P POST CUT E-LINE AND REBOOT. PICK UP TOOLS TO FREEZE PROTECT. INSTALL INJECTOR. PRESSURE TEST QUICK CONNECT SUB. RIH TO 2500' RIG UP DIESEL TANKER TO THE COIL. PUMP 40 BBL DIESEL INTO COIL. 19:45 - 21:30 1.75 BOPSUR P POST CIRCULATE 40 BBL DIESEL INTO COIL.ONCE DIESEL IS AT NOZZLE, SLOWLY PULL OOH FREEZE-PROTECTING TUBING.ATSURFACE, FLOW-CHECK WELL, POP OFF INJECTOR !AND LD BHA#9. MEANWHILE N2-CREW ARRIVE ON LOCATION AND SPOT EQUIPMENT. 21:30 - 22:45 1.25 BOPSUR P POST CLOSE SWAB VALVE AND STAB ON INJECTOR. RIG UP N2-TRUCK TO RIG'S CEMENT LINE. 22:45 - 23:00 0.25 BOPSUR P POST ,HOLD PJSM WITH RIG CREW AND N2 SLB CREW. 23:00 - 23:40 0.67 BOPSUR-- P POST PRESSURE-TEST N2 SURFACE LINES TO 300PSV5MINS AND 3,500PSV5MINS.ACHIEVE GOOD PRESSURE-TEST. 23:40 - 00:00 0.33 BOPSUR P POST START PURGING COIL BY CIRCULATING 5OBBLS FRESH WATER FOLLOWED BY 15BBLS CORROSION INHIBITOR AND 1OBBLS METHANOL THROUGH COIL. 12/1/2012 00:00 - 00:30 0.50 BOPSUR P POST BLOW DOWN COIL WITH N2 AT 18SCF FOR 15MINS. 00:30 - 01:15 0.75 BOPSUR P POST BLEED DOWN N2 FROM COIL TO TIGERTANK. 01:15 - 01:40 0.42 BOPSUR P POST STAND BACK INJECTOR. 01:45 - 02:15 0.50 BOPSUR P POST HOLD PJSM WITH VALVE CREW.GREASE TREE VALVES AND SET'H'-TYPE BACK PRESSURE VALVE(BPV). 02:15 - 03:00 0.75 BOPSUR P POST FLUSH TREE WITH MEATHANOL. SUCCESSFULLY TEST TREE VALVES TO ESTABLISH BARRIERS FOR BREAKING CONTAINMENT. 03:00 - 04:30 1.50 BOPSUR P POST OPEN BOP-DOORS AND INSPECT RAMS. 04:30 - 07:30 3.00 BOPSUR P POST NIPPLE DOWN BOP. SECURE SAME UNDER THE FLOOR. INSTALL TREE CAP AND TEST TO 250 PSI • LOW AND 3500 PSI HIGH. BOTH TESTS HELD FOR 5 MINUTES. 07:30 - 10:00 2.50 RIGD P POST RIG DOWN.BLOW DOWN LINES.PREPAIR TO MOVE. RIG RELEASED AT 10:00 DECEMBER 1 2012 Printed 12/17/2012 1:30:19PM Page 1 of 1 • Schwartz, Guy L (DOA) From: Schwartz, Guy L (DOA) Sent: Monday, November 26, 2012 1:16 PM To: 'Ross, Matthew' Cc: Davies, Stephen F (DOA) Subject: RE: E-20B Top of liner(PTD 212-120) Matt, You have approval to move the TOL to 9090' and (from original depth of 9490' md) This is less than 500' and from the original plan. This is really only a change in liner tieback length and is and not part of the drilled section. A sundry to make this change is not required , I will place this email in our file as a record. PS: please add PTD#in subject line of email. Guy Schwartz Senior Petroleum Engineer AOGCC 793-1226 (office) 444-3433 (cell) From: Ross, Matthew [mailto:rossmo@BP.com] Sent: Monday, November 26, 2012 12:00 PM To: Schwartz, Guy L(DOA) Subject: E-20B Top of liner Guy; We would like to make a small change to the top of liner&top of cement for E-20B. We originally had top of liner&cement at 9490'md &would like to change that to^'9090'md.This will slightly change our cement volumes by an extra 1.5bbls for a total of 15bbls.These changes will help in our future plans for this well. I hope you will find these changes satisfactory. Please let me know if I can proceed.Thanks. Matt. 11/26/2012 r TREE= 4-1/16"CAN i WLLLFFAD= FMCE-2 0 B SAFE.r NOTES:'4-1/2"CHROM E TUG TAIL' I AC KB.ELBProposed CTD Sidetrack OR 0715 K8.Eir= so.5a' 13F aev= 32.01' KOP= 3000' Aka Angle= 37 fl 4100' Daun k13_ 2112' —412"FES X NP,D=3.813" Datum"IVD= 8800'SS jj ( 13-3/8'CSG,72#,L-80,D=12.34T --j 269W GAS LFT MANDRELS ST MD TVD IDEVFTYPE VLV LATCH FORT DATE t I 4 3430 3416 19 KBG2 DOME BK 16 11/20/04 3 6181 5705 34 I KBG2 DMY BK 0 04/30/05 Minimum ID =3.80"@ 9261' i ,�, 2 7967 7214 29 KBG2 DMY BK 0 10/16/04 4-112"HES XN NIPPLE �� 1 9085 8185 26 KBG2 DMY BK 0 10/16/04 ��j —4400' EST.TOP OF CEMENT lo A8607' —7'FES FLOAT DOLLAR w/318"ORIFACE HOLE 14 Li J 8625' -17"T133ACK/SCAB L.N2,2811,L-80 111 BTC-M.0383 hpf.D=6276" 8642' —19-5/8'X T BKR HMC LNR HGNR,D=6.310' MILOUT VWllOW(E.20A) 876T-8783' 4, 9196' 1-44-1/2'HES X NP,D=3.813" j 9216' H7'X 4-12'BKR S-3 PKR,D=3.875" _ 9-5/8"CSG,47#,L-80,D=8.881" H 9468' —y1� • 4'1 j' 9240' 4-1/2'FES XNP,D=3.813' A. 7"LNR,26#,L-80,D=.: 10 E -. ., 9261' —4.5'XN NP,D=3.80"tried out 7"deployment sleeve Ti w.. na f r \I IF 9273' —4-1/2'111/LEG,ID=3.958' p�ORAT � OL(TOC =9,09L 4-1/2'TBG,12.6#,13CR80 REF LOG: MWD ON 10/14/04 A Tat.0152 bpf,ID=3.958' ANGLE AT TOP PERF: 5©9854' ��yy����" 9279' —7"X 5'BKR FLEX- Note:Refer to Production DB for trstorical pert data `� LOCK LfR I-WGR, 44' SIZE SPF MHZVAL Opn/Sqz DUE $4 . 7't nit 161. 2 718" 9854-9935 F indr g L-BO �.0363 bpf_D=$2x6' TSGR 9,467'MD 4.5"Whipstock • 9,530'MD 12° COP @ 9800' ii& 3-3/16"6.2#L-80 liner • TD @ 10,771'MD .4114, I PBTD --I 9962' N'► _ 4- _-1/._(•.- L.rVK, L.Oii,l-o0[ST M,.via[opt,u-,3.9:511,3.9:511f TUU)U F_7QA DATE REV BY COMMENTS DATE REV BY — 1IItulJT)L T YT T� 12/17/81 I OIaGINAL COMPLETION 12/27/07 MAC/TUI 4-1/2'PX PLUG(12/27/07) WELL: 10/17/04 N2E3S SIDETRACK(E20A) 05/31/10 SE3N/PJC PILL PX PLUG(05/30/10) PERSNT No: 04/30/05 RVINPJC GLV C/O 08/30/11 EV CTD PROPOSED SDETRAOC API No: 50-029-20576.01 06/11/05 /TL.H FERF SEC 6,T11 N,R14E,1743'FAL 8 883'FEL 12/09/05 TMNTLH DRLG DRAFT-CORRECTION 08/29/06 RDNTLH WAIVER SFTY NOTE DF►FTH3 BP Exploration(Alaska) I Sr SEAN PARNELL,GOVERNOR L OT �J LASEn ALASKA OIL AND GAS 333 W.7th AVENUE,SUITE 100 CONSERVATION COMMISSION ANCHORAGE,ALASKA 99501-3539 PHONE (907)279-1433 FAX (907)276-7542 John McMullen Engineering Team Leader BP Exploration (Alaska), Inc. P.O. Box 196612 Anchorage, AK 99519-6612 Re: Prudhoe Bay Field, Prudhoe Bay Oil Pool, PBU E-20B BP Exploration (Alaska), Inc. Permit No: 212-120 Surface Location: 1743' FNL, 883' FEL, SEC. 06, T11N, R14E, UM Bottomhole Location: 3255' FNL, 1124' FWL, SEC. 05, T11N, R 14E, UM Dear Mr. McMullen: Enclosed is the approved application for permit to re-drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the Commission reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the Commission specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or a Commission order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, r - Daniel T. Seamount, Jr. Commissioner DATED this 3 �± day of August, 2012. cc: Department of Fish 86 Game, Habitat Section w/o encl. (via e-mail) Department of Environmental Conservation w/o encl. (via e-mail) STATE OF ALASKA RECEIVED ALAS SIL AND GAS CONSERVATION COMM DN AUG 0 7 2012 PERMIT TO DRILL 20 MC 25.005 AOGCC 1 a Type of work: 1 b Proposed Well Class ®Development Oil ❑Service-Wlnl ®Single Zone - 1 c. Specify if well is proposed for. ❑Drill ®Redrill 0 Stratigraphic Test 0 Development Gas 0 Service-Supply 0 Multiple Zone 0 Coalbed Gas 0 Gas Hydrates ❑Re-Entry 0 Exploratory 0 Service-WAG 0 Service-Disp 0 Shale Gas 2 Operator Name 5. Bond: ®Blanket 0 Single Well 11. Well Name and Number: BP Exploration(Alaska) Inc. Bond No. 6194193' PBU E-20B • • 3 Address 6 Proposed Depth: 12 Field/Pool(s) P.O. Box 196612,Anchorage,Alaska 99519-6612 MD 10771' • TVD 9020'ss Prudhoe Bay/Prudhoe Bay 4a. Location of Well(Governmental Section). 7 Property Designation(Lease Number): Surface: ADL 028304 ' 1743' FNL, 883' FEL, Sec.06, T11N, R14E, UM ' Top of Productive Horizon. 8. Land Use Permit 13 Approximate Spud Date 4138'FNL, 1437'FWL, Sec.05,T11N, R14E, UM October 1, 2012 Total Depth 9.Acres in Property. 14. Distance to Nearest Property: 3255' FNL, 1124' FWL, Sec. 05,T11N, R14E, UM 2560 7600' 4b. Location of Well(State Base Plane Coordinates-NAD 27). 10 KB Elevation above MSL 59.11' feet 15 Distance to Nearest Well Open Surface: x- 664103 • y-5975313 • Zone- ASP4 GL Elevation above MSL: 30.36' feet to Same Pool: 1650' 16.Deviated Wells Kickoff Depth. 9530' • feet 17 Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle 85 degrees Downhole: 3304 • Surface. 2424 • 18. Casing Program. Specifications Top-Setting Depth-Bottom Quantity of Cement,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 4-1/8" 3-1/2"x 3-1/4" 9.2#/6.6# L-80 STL/TC-II 1281' 9490' 8495'ss 1071' 9020'ss 73 sx Class'G' Zi.ry • 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-entry Operations) Total Depth MD(ft). Total Depth TVD (ft): Plugs(measured). Effective Depth MD(ft) Effective Depth TVD(ft). Junk(measured): 10050' 9109' 9261' 9962' 9021' None Casing Length Size 1 Cement Volume MD TVD Conductor/Structural 110' 20"x 30" 8 cu yds Concrete 110' 110' Surface 2669' 13-3/8" 2627 cu ft Arcticset II 30'-2699' 30'-2699' Intermediate 8738' 9-5/8" 1292 cu ft Class'G', 130 cu ft AS I 29'-8767' 29'-7907' Production Liner 9400' 7" ,213 cu ft Class'G',466 cu ft'G', 163 cu ft 25'-9425' 25'-8493' 784' 4-1/2" 162 cu ft Class'G' 9266'- 10050' 8349'-9109' Perforation Depth MD(ft): 9854'-9935' Perforation Depth TVD(ft) 8913'-8994' 20 Attachments: 0 Property Plat ®BOP Sketch ®Drilling Program 0 Time vs Depth Plot 0 Shallow Hazard Analysis ®Diverter Sketch 0 Seabed Report ®Drilling Fluid Program ®20 AAC 25.050 Requirements 21. Verbal Approval. Commission Representative: Date. 22. I hereby certify that the foregoing is true and correct Contact Matt Ross,564-5782 Printed Name John McMullen Title Engineering Team Leader Fit -1-7/41 �C/"( j((t . Prepared By Name/Number Signature/4", ,c,„4.77gas, Phone 564-4711 Date Joe Lastufka, 564-4091 ' �. Commission Use Only Permit To Drill �r� API Number. Per i i P�p�gfov�/vI Date' See cover letter for Number: ,,L 1 2- I w 50-029-20576-02-00 - (6 I) !/ other requirements Conditions of Approval. If box is checked,well may.not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained shales: 1E(Other 3 5-06 /5 - L+ �� Samples Req'd• 0 Yes 13/No Mud Log Req'd: 0/Yes 0 No H2S Measures: [2/Yes El No Directional Survey Req'd. IB Yes 0 No F/30 ele Iillik APPROVED BY THE COMMISSION ( Date ,COMMISSIONER'S Form 10-401 Revised 07/2009 This permit is valid L for 24 months from the d: e of approval(20 AAC 25.005(g)) Submit In Duplicate N g;zirz ORIGINAL 00142- �1,N` To: Alaska Oil & Gas Conservation Commission bp From: Matthew Ross 0 CTD Engineer Date: August 6, 2012 Re: E-20B Permit to Drill Request Approval is requested for a permit to drill a CTD sidetrack from well E-20A. CTD Drill and Complete E-20B program: Riq Start Date: October 1st, 2012 Pre-Rig Work: (scheduled to begin September 15th, 2012) 1. F MIT-T 2,500 psi. MIT- IA to 3,000 psi, MIT-OA to 2,000 psi. 2. S Drift for 4'/2" monobore whipstock to 9600' md. 3. E Set 4W monobore whipstock at 9,530' md. 4. E Mill XN profile at 9,261' and to 3.80". 5. V PT MV, SV, WV. Bleed wellhead pressures down to zero. 6. 0 Bleed production flow and GL lines down to zero and blind flange. 7. 0 Remove wellhouse, level pad. Rig Work: (scheduled to begin October 1st, 2012) 1. MIRU and test BOPE to 250 psi low and 3,500 psi high. 2. Mill 3.80" single string window in 4-1/2" 12.6# L-80 production liner from mechanical monobore whipstock at 9,530' and and 10' of rathole. Swap the well to Power-Pro SF. 3. Drill build: 4.125" OH, 470' (25° /100 planned) with resistivity. 4. Drill lateral: 4.125" OH, 771' (12° /100 planned) with resistivity. 5. Run 3-1/2" x 3-1/4" L-80 liner leaving TOL at 9,490' md. 6. Pump primary cement leaving TOC at 9,490' md, 15 bbls of 15.8 ppg liner cmt planned. 7. Perform liner cleanout with mill, motor and MCNL/GR/CCL log. 8. Test liner lap to 2,400 psi. �� 9. Perforate - 100'. ( ' 10.Freeze protect well to 2200' TVD. 11.Set BPV. ND BOPE stack. Freeze protect tree and PT tree cap to 3500 psi. 12.RDMO Nordic Rig. Post-Rig Work: 1. Re-install wellhouse, flowline and pull BPV. 2. Set 4-1/2" KB liner top packer. 3. Generic GLV's. Mud Program: • Milling/drilling: 8.6 ppg Power Pro for milling window and drilling (-631 psi overbalance). Disposal: • All drilling and completion fluids and all other Class II wastes will go to Grind & Inject. • All Class I wastes will go to Pad 3 for disposal. Hole size: • 4.125" hole: 9,530' and - 10,771' and Casing Program: E-20B Production String Interval: • 3-1/2", L-80 9.2 lb/ft STL solid liner, 9,490' and - 9,520' and • 3-1/4", L-80 6.6 lb/ft TC-Il solid liner, 9,520' and - 10,771' and • The primary barrier for this operation: a minimum EMW of 8.4 ppg. • A X-over shall be made up to a safety joint including a TIW valve for all tubulars ran in hole. ■ This liner will be cemented in place. o A minimum of 15bbls of 15.8 ppg Class G cement will be used for protection liner cementing. (Assuming 4-1/8" hole size as specified above with 40% excess in open hole & 170' of 4-1/2" liner sump to CIBP at 9,700' md). o TOC planned at 9,490' md. Well Control: • BOP diagram is attached. • Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. • The annular preventer will be tested to 250 psi and 3,500 psi. Directional • See attached directional plan. Maximum planned hole angle is 84.97°. • Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. • Distance to nearest property - 7,600'. • Distance to nearest well within pool - 1650'. Logging • MWD directional, Gamma Ray and Resistivity will be run over all of the open hole section. • Cased hole GR/CCL logs will be run. Anti-Collision Failures: • None. Hazards • The maximum recorded H2S level on E pad was 110 ppm on well E-102 on 5/11/2011. • Lost circulation risk is considered high due to the location of the well path in the Midfield Graben. Reservoir Pressure • The reservoir pressure on E-20B is expected to be 3,304 psi at 8,800' TVDSS. (7.2 ppg equivalent). • Maximum expected surface pressure with gas (0.10 psi/ft) to surface is 2,424 psi. • An EMW of 8.4 ppg for this well will provide 539 psi over-balance to the reservoir. 1.1;1, Matthew Ross bD CC: Well File CTD Engineer Sondra Stewman/Joe Lastufka TREE= 4-1/16"CIW _ WELLHEAD= FMC E_2 0 A 4-1/2"CFFUAET ACTUATOR= OTIS KB.ELEV= 60.54' BF.ELEV= 32.01' L I ' ' KOP= 3000' —LL� Max Angle= 37 @ 4100' 34' —I5-1/2"X 4-1/2"XO,ID=3.958" _Datum MD= 9800' I I 2112' —14-1/2"HES X NIP,ID=3.813" Datum TVD= 8800'SS 13-3/8"CSG,72#, L-80,ID=12.347" —I 2699' {--, , GAS LIFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3430 3416 19 KBG2 DMY BK 0 08/12/11 L. 3 6181 5705 34 KBG2 DMY BK 0 04/30/05 2 7967 7214 29 KBG2 DMY BK 0 10/16/04 Minimum ID = 3.725" @ 9261' 1; I� 1 9085 8185 26 KBG2 DMY BK 0 10/16/04 4-1/2" HES XN NIPPLE 1i ►. 11 ►. —4400' —I EST.TOP OF CEMENT 14 �1 t' ,' 8607' H 7"HES FLOAT COLLAR w/3/8"ORIFACE HOLE 1 ► 8624' —17"BKR LOC&SEAL ASSY(3 SETS),ID=6.17" I 7"TIEBACK/SCAB LNR 26#,L-80 8625' I 8625' I9-5/8"X 7"BKR ZXP LNR TOP PKR BTC-M,.0383 bpf,ID=6.276" 1w/TIEBACK SLV,ID=6.30" 8642' —19-5/8"X 7"BKR HMC LNR HGNR,ID=6.310" MILLOUT WINDOW(E-20A) 8767'-8783' TOP OF WHIPSTOCK(10/02/04) —I 8767' 9-5/8"EZSV(10/01/04) -j 8810' 69195' —14-1/2"HES X NIP, ID=3.813" 9216' I—7"X 4-1/2"BKR S-3 PKR,ID=3.875" 9240' —14-1/2"HES X NIP,ID=3.813" TBG STUB(09/30/04) --I 8870' O�1.14 SAL 9240' —4-1/2"XX PLUG(08/12/11) [IOW 111.. _ " '� 9261' —14-1/2"HES XN NIP,ID=3.725" 5-1/2"TBG, 17#,L-80,ID=4.892" --I 8909' ��'���������, �� .1r 9266' 7"X 5"BKR ZKP LNR TOP PKR 1111) 1 w/TIEBACK SLV,ID=4.44" TOP OF 7"LNR 8959' 1 x.111.1 r�����i 9273' —4-1/2"WLEG,ID=3.958" I 4-1/2"TBG, 12.6#,L-80,ID=3.958" --I 9051' 1' `•> -4,:,...1. 9-5/8"CSG,47#,L-80, ID=8.681" — 9458' 400.0 \ 9279' 7"X 5"BKR FLEX- O . 1.6.6.6.6.6.6.6.1 Pr. LOCK LNR HNGR, 7"LNR,26#,L-80, ID=6.276" 102 ►11/11111/111111 62' ID=4.44" 9289' —5"X 4-1/2"XO, PERFORATION SUMMARYID=3.99" 4-1/2"TBG, 12.64,13CR80 -I 9273' I REF LOG: MWD ON 10/14/04 TCII,.0152 bpf, ID=3.958" ` ANGLE AT TOP F'ERF: 5 @ 9854' ` Note:Refer to Production DB for historical pert data SIZE SPF INTERVAL Opn/Sqz DATE 7"LNR,26#,L-80 BTC-M, —I 9425' I ` 2-7/8" 6 9854-9874 0 06/11/05 .0383 bpf,ID=6.276" ` 2-7/8" 6 9875-9925 O 03/14/05 ` 2-7/8" 6 9886-9896 0 01/02/05 2-7/8" 6 9899-9909 0 12/21/04 .� 2-7/8" 6 9899-9935 O 11/26/04 PBTD --I 9962' I ; ��t. 4-1/2"LNR, 12.6#,L-80 IBT-M, .0152 bpf,ID=3.958" —I 10050' I DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/17/81 ORIGINAL COMPLETION 12/27/07 SWC/TLH 4-1/2"PX PLUG(12/27/07) WELL: E-20A 10/17/04 N2ES SIDETRACK(E-20A) 05/31/10 SEW/PJC PULL PX PLUG(05/30/10) PERMIT No: 2041890 04/30/05 RWL/PJC GLV C/O 08/14/11 MBM/PJC SET XX PLUG/GLV C/O(8/12/11) API No: 50-029-20576-01 06/11/05 /TLH PERF SEC 6,T11 N,R14E, 1743"FNL&883'FEL 12/09/05 TMN/TLH DRLG DRAFT CORRECTION 08/29/06 RDW/TLH WAIVER SFTY NOTE DELETED BP Exploration (Alaska) WELLHEAD= 4-1/16" NAC E-2 0 B SAFETY NOTES:"4-1/2"CHROMETOG TAIL' - ACTUATOR BEV = ons KB.B.BEvProposed CTD Sidetrack = 60.54' P BF.ELEV= 32.01' KOP= 3000' Max Angle= 37 0 4100' Datum MD= 9800' II M 2112' —i4-1/2"HES X NP,D=3.813" Datum TVD= 8800'SS II.: 13-3/8"CSG,72*,L-80,10=12.347" —i 2699' }-- GAS LFT MANDRELS ST MD TVD DEV TYPE VLV LATCH PORT DATE 4 3430 3416 19 KBG2 DOME BK 16 11/20/04 LIi 3 6181 5705 34 KBG2 DMY 8K 0 04/30/05 2 7967 7214 29 KBG2 DMY BK 0 10/16/04 Minimum ID =3.80" 9261' ,s 1 9085 8185 26 KBG2 DMY BK 0 10/16/04 41/2" HES XN NIPPLE Willed out) I ►1 II -4400' —{EST.TOP OF CEMENT )11 ►1 8607' -17"HES FLOAT COLLAR w/3/8"ORFACE HOLE I 11 It , 8625' —7"TIEBACK/SCAB LNR 26$,L-80 111 BTC-M,.0383 bpl,D=6.278" 8642' H9-5/8"X 7"BKR HMC LNR HGNR D=6.310" MLLOUT WINDOW(E20A) 8767'-8783' Al. 9195' H4-1/2"HES X NP,D=3.813"_ 416 9216' —{7"X 4-1/2"BKR S-3 PKR D=3.875" ,, 9240' —j41/2"HES XNP,D=3.813' 9-5/8"CSG,47*,L-80,ID=8.681" 9458' ..�_.��_ •• . Ia 7"LNR,26*,L-80,D=6.276" H 10262' E-20 ,' 9261' H4.5"XN NP,ID=3.80"milled out III 9273' —4-1/2"WLEG,D.3.958" PERFORATION SUMMARY 4-1/2"TBG,12.8x, t 3CR80 REF LOG: MWD ON 10/14/04 TOL.0152 bpf D=3.958" ANGLE AT TOP PERF: 5®9854' • 9279' —7"X 5"BKR FLEX- =Note:Refer to Production DB for historical pert data ♦ LOCK LNR HNGR,It4.44" SIZE SPF NTERVAL Opn/Sgz DATE 9120' 7'Eta 280 LAO 2-7/8" 6 9854-9935 038 BTC-M. 0383 bpf_0'027.3 TSGR 9,467' MD stock 3.7" deployment sleeve/4.5" KB LTA 4.5"9,53Wh0 MD 9,530'MD • TOL/TOC 9,490' 12° ,),CIBP @ 9800' "4 #L-80 liner • TD @ 10,771' MD ���• PBTD 9962' 4-1/2"LNR 12.611,L-80 R9T-M,.0152 bpf,D=3.958" 10050' E-20A DATE REV BY COMMENTS DATE REV BY COMMENTS PRUDHOE BAY UNIT 12/17/11 ORIGINAL COMPLETION 12/27/07 SWCITLH 4-1/2"PX PLUG(12127/07) WELL: E-20B 10/17/04 N2ES _SIDETRACK(E-20A) 05/31/10 SEW/PJC PULL PX PLUG(05/30/10) PERMIT No: Pending 04/30/05 RWEJPJC GLV C/O _08/30/11 EV CTD PROPOSED SIDETRACK API No: 50-029-20576-01 06/11/05 /TLH PERF SEC 6,MN,N,R14E,1743"FNL&883'FEL 12/09/05 TMN/TLH DRLG DRAFT CORRECTION 08/29/08 RDN/TLH WAIVERSFTY NOTE DELETED BP Exploration(Alaska) Q a z3 z ", CO N 7 o .4' I 0 O) 0 O N{ CI O O V N in O N �t;: CO p 4,40 N v U N O S c } d N ?62 �' U N O` J ' N u J .U Q J a N �rM ry Lii (n cal 6 E O y N N > + 7 7 Cl) 5 an I: M m Fr, E_ C O) O N F W g to 1 C k y J J 0 ., ii > 9 7 O N 7 O)h. U . O S p aCes i L J J 0 v: N w d a C '1 d O 1'O• UV d > 7 CN m O w 3- 0 gR m O w 4NO Vi E = = S '1viON OUNymTo m (- Oco of 0 y r O chi en f « m p �� O O F R Z (A o cn (00 N o = V V I` a m J a m N p p 4 O L .,. N CD m m0 ` O o 1() d u) v EE'JJ uS r, aet O) 10, t CI) k` < H # I.. , 0 O. 7-5C a � � oxo Ma. W — o m h > i'; N ~ N 7 O N co C kil C)9 W t`x N ry c ag a v a o1 C °� a 2 W M Epp w 0 - e.0 3 e; y ter, PtO CO W 0 �r mco _ z C C N 0 O E a ox o a yin LL M V' OS t N L CO X Q ,- W 0 0 O y W 0 0 0 0 _ p Q m ,---- O 0 N O O O 0 CO 03a) — 0 m 0 I) g 0 d CI v a (;) 0 N 0 N Z y m '0 I' m o > a ID N )0 a O. W CO ��pp d c colU) N O Y 7 3 O co g + L t a o m (n Q m j + + O• -7 m N (";1 c =Z Q Z d a W W 0_ W o N C O C V t) AWA a. d c ° r 7 c .. a.N 01 o m o g z m C . N C H C C m= W ay _ a rn y (n DN ao a p .... rn _ ° o 0 .— « y d O 6 .O-� E 'y N N V L' N • 2 ,.. m d O O O d O a) Z 00 n o a` 505 in �naa 3 3 a. 3 0 a > > N 0 N 0r CD .- CO 0 0 0 0 m CO v n N- O m 0 u) N N 0 0 0 0 0 C (11 m -O Q O m O co V . m 0 0 0 0 of co a N N— CD O) CO CO CO CO m 5 OWCO wo C'i J F- 0 (7 N )O N O Q co m N- N V O co co CD n N N N- CO m CD a + m N .- CO N 1l) M M N O N CO n .- O 0 O V m N V Ni Si m co m M n a N a Q n n n n n n CO N .- U) a CO 0 GD d U) N U) N N N (11 U) v) st Si M M N .- C) N.. N g N N N N N N N N N N N N N N N = IM e > of N 'o © 22 O N 7 d a > Z C1 CO 0 0 N 0 0 0 0 0 0 0 0 0 0 0 0 0 (7) Z 0 N 0 0 0 0 0 0 0 0 0 0 0 0 0 J 3 Q O m W N N N N N N N N N N N N U N N N N N N N N .- .- .- x- N E m N ' Q co j 2 H .2 W N CO N N W V 0) ? m m N- 0 V M 0 N M m M N M M V N n M N . m m N n m m M M N .- m m co N 0 y M CO V V a a V M CO 0) M n M 0 I.) ii) 0) sr sr sr sr 7 sr sr C M M N N .- .- e- C OC m m CO m co CD CD m m CO m m m m m L i7 m co co m co m m CO CD m CD CD CD CD m w o y m co co co CD m (0 m CD CD CO CD m m m a) E W ct c G O d r iN u a) C 9 C u M N O m a) M co N N- 0) M N U) n L, C co O) m M N W co n CD O m 0 O 22 ` i0 N O m 0) n m 0 Ni O) m N U) U) O m O , w d 0 N N- n n n co co co 0) C') co O) N 0 O y W T N O) O) co O) m O) co co O) O O O .- N M sr W L N L C1 C N N N N N N N N M M M M M• M• M U 0 i+ «a .N n n n n n N- 0) r- 0) n n n i- 0) n n n n j 0) W O) 0) O) W W O) O) O) O) O) 3 F 2 Z f% g 8 m 72 0 N N N ui N N N N N N N N vi N• vi C + U Z C g 2 C Cu — U) O EN"' a) O. l0 + ) N m N CO M O) 0 U) N n 0 0 CD CO N CCU 0) co co n W M a-- N O .- N n CO O Q' u) t+i n Ni c6 O) Oi N N si n n N a) >, co m CO co W O) co n CO m V ONCOO a 0 C7 2 2 N N N N N N N N N .- .- 0 0 O) O) au C 2S _ N N N N N N N N N N N N N la m W Q I- 0. 0 d U CO n N.- O) co O) V n N O) .- n CD ' 0) CO CO m N m 0 m m co co 0) N 0) M O) V' 01 m C') V N N M M co O m V R m m O + m N-y ) Q Cc) 0 N N N010 O) F NN N N N N N N N N N N N• N QZ Q N Cp0 Z LL 8 co n N v n O) .- m cn n O) 0 sr O) N co 0) N N n 0) 0 0 m N . N M M O) 0 n m O) m N 01 V O M N N M N CO 0 CD 0) n N M CD m n m W N N N N m CD m CD n m CO m m m m CO- CO m CO- CO- CO- m co- co- m m co- co- co- m 13 8e N W 0 O .CSI- 0 0 m M O 0 N 0 0 0 0 0 0 0 N m M ' CD N 0 CD 0 0 0 0 0 0 a U) N N T O O N: O m N: n N n N m m O N N Q .- O N N 0 0 0 0 0 N V N O M M M M Ms- M M M p = N .0 CD w m 0 o ce N co — O LL w N N T Q M N 0 O C W 7 N N N N 0 N 0 0 M M M 0 C 0) U) g Cr) N W D m O M N N- N N M M M 0 V M n M N oi O m n CO U a O) a O O N V' Q N O N O N V N-m m m m m co O O U N O o oi tO r C C (I) co E a) 2 m rn o 0f O L L a m O O M O 0 p W O O c 1 O E m N N 0 E 11) Z LL d W W W ` CO o M M 0 0 N N 0 m 0 0 0 0 0 0 0 0 0 .... N o o M 0 0 O N 0 cD n 0 0 0 n h 0 0 0 0 W h. T O O O co O t7 V O O O N N O O O O N d a) N CO N CO 0 .- m 0 0 0 N )r 0 0 0 O N N N O N co m m N- CO m 0) O O - N M 0 1��'f' — EO m rn j _ ac co- a co- 'O 0I o Qi Q) O) Oi O1 Oi •O o o• O• o V ��,� c .. m .. H LL cn . F Y W O m m W 4Zd au O C d c m FW. E o ci m m 'a) Z 0CSI Z O Q Cl) 0 v) a 0) O 0 N- O u) N 0 0 N 10 O 0 N N O N 0 0 V U L2 O O O) h O O 6 co 0) ) .- .-.- co co W 0 co m 0 V •• o 4. co Jo 0 N (D CO M co 6 co .- co u) N- N N N a + CO O (13 CD CO N N O) O N O m U) V O) V 00 N 0 U) d co V 0N CO 0 0) OD n f0 N -V CO 0 0N CO 0 01 V N N N N x I (0 e j of N -o pp,� N O N V 7 d J ca 0 0 O 0 O O O O O O O 2 , J co U a r .- .- .- .- .- N .- N N T., _ N N E O7 + 7 • r g W C O J O 2 N r 2 w N 6 n ,- 1D u) M N 0 h O OJ M CO 0 co V M O O 6 O 0 f` V N: d O O O O 0 C OC (D (O (D (D O) (D OJ (O (O u) i r r U) O (D (D O CD O O (D (D wN y (D co (O (D (D (D (O (O (D (O y E W K c 1. CD ! flH u)0) M N. O O O O M co m V U O) R' ], m co V V u) (D (D h N- N- co Ce 0) . o .0 c M M M M M M co- M7.3 M M 0 >❑> IX 0 0 7 CO C OO)) N- W O OO)) N- T N- 0 Ort J F E 2 U) 0 o (D (n u) u) U) u) (n U)0 vi vi I— 0_ co aO CO N (D (0 N- V CO N W UO 0 N CD (O V (D 01 0 Q I'g.y U)111 U)IN n111 n LC) LO IN co O n N Q. 0) 0 0) 0 O) 0) 0 Of 0 01O 0 a N U) 7 < H CL a N N. a) OD M V 0) IN O CO u) (D O 0 N. M h N- 4 h 0 T N V N N O) V M N , OD u) u) u) u) N O) N W CO OD OD N- CO (D u) CO (n 1 0 0 03 (: CO IN V M N N M N 0 u) 0 u) 0 0) -.-: :..... 00 ,- V V r M r (D N- O) co a) p) a) V OJ N- co 00 co 0 CO 0 0 0 0 01 O N CO- 0. CO- CO- CO- OD 00 0 00 01 a N- N (OD CO 0 (VD 0 0 0 OD O (D V) V N (D O N- Oo u) u) 6 .- .- N s- co co co A r 0- op 1 Co co co sr U) 0 a co m co m IN C 0 0 0 D co a) co C 0 li Q 0d N N C m M 0 7 m f0 . y 2 d. 4. W W d co co W O O O O) O) 0 0 >, C) (O 6 O O 6 N4 O n.N MI W Z CM) CC) CC) V V) (OD COCr- o CDD N - N- - O `W= 7 Q O O O 0 0 0 O O O OEc) sr a01 u p C d = W a ° a rn c o c N r-i WI -- W�� a , . _N -t ----1- 1 r § O 1 a: w N m o - , + r t a- r $ N 8 1 ----I "a---N pp -- / O --- --- ! - fir ^ is es. 1 Dvp� C'. , Q 8 t-'� __ W 1 -. \ T it _ ^ h N N �� / C ^ S 8 8, 1 A n Q N 4 N W - No — a Li ��m 1-- — ill - 'S m .c2c2�$ " = e� - N t $ - IVY h. v 0 I 1 I N w � s N .- w I NN OO en O V LU GO 1 Q NI 00 ' - en V C7 Lli s 2Td N- 47 O Ow mo - " N N O v - NN OT " - -' c8T N ,N - El441/ eLITI n M ( /8 c6)O4-WJ0N -1Rn0S $ a G Fc' n ' mas • tA j o N g8 te o Fes$ • % r + I g I 19▪ I ÷ NN I - - II O S N N Ali w I < a v3 N s 5, AWAL-23NRKIWL-L'M, tn us N. 4�}xtta ax�� � — W— N9 m " A. 1a ry l 2 8tX83A2888888 F . o o w o� r< o - --.-___ _,$ N 2m000 � N N 8 r�N , aawww -5.!..77,;e2 v_ N v Z S8888.8 a o o as 'n g-ai o... r ___-_—___-_._-. n n 3. armmmmo �a "Il w 1111111111O "" �lRa3< o A▪ ^ o Tm222,'.3 0.zg-0 w' in gr INzasz.;Q31--Aimila. • w_ ra S-�t�s VRm gn �ooe�asmN< " , N Qrasss22sm�� .0 m^ommL;8zgzs,74s 0 0 ''' ;8 a4.c3 I 0R8806. • 8 m (uuu 09)g1daQ MO R.I3A ana,i, /fin BPPASSPORT BAKER HUGHES Travelling Cylinder Report by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-20-Slot 20 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB E Pad MD Reference: 28.50+30.61 GL @ 59.11ft(28.50+30.61 GL) Site Error: 0.00ft North Reference: True Reference Well: E-20 Survey Calculation Method: Minimum Curvature Well Error: 0.00ft Output errors are at 1.00 sigma Reference Wellbore E-208 Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 3 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB E Pad E-02-E-02-E-02 Out of range E-02-E-02A-E-02A Out of range E-02-E-02APB1-E-02APB1 Out of range E-02-E-02B-E-02B Out of range E-02_DO NOT USE-E-02-E-02 Out of range E-02_DO NOT USE-E-02A-E-02A Out of range E-02_DO NOT USE-E-02APB1-E-02APB1 Out of range E-02_DO NOT USE-Plan 4,E-02B-Plan 4 Out of range E-06-E-06-E-06 Out of range E-06A-E-06A-E-06A Out of range E-16-E-16-E-16 Out of range E-18-E-18-E-18 Out of range E-18-E-18A-E-18A Out of range E-19-E-19-E-19 Out of range E-19-E-19A-E-19A Out of range E-19-E-19B-E-19B Out of range E-19-E-19C-E-19C Out of range E-19-E-19C Extended TD-E-19C Extended TD Out of range E-19-E-19C Extended TD-Plan#1 Out of range E-19_DO NOT USE-E-19-E-19 Out of range E-19_DO NOT USE-E-19A-E-19A Out of range E-19_DO NOT USE-E-19B-E-19B Out of range E-19_DO NOT USE-E-19C-Plan 6 Out of range E-20-E-20-E-20 9,532.48 9,600.00 258.47 16.41 242.57 Pass-Major Risk E-20-E-20A-E-20A 9,550.00 9,550.00 0.14 0.65 -0.46 FAIL-Major Risk E-20_DIMS-E-20-E-20 Out of range E-20_DIMS-E-20A-E-20A Out of range E-21 E-21-E-21 Out of range E-21-E-21A-E-21A Out of range E-21-E-21 B-E-21 B Out of range E-24-E-24-E-24 Out of range E-24-E-24A-E-24A Out of range E-24-E-24APB1-E-24APB1 Out of range E-24-E-24APB2-E-24APB2 Out of range E-24-E-24B-E-24B Out of range E-25-E-25-E-25 Out of range E-26-E-26-E-26 Out of range E-26-E-26A-E-26A Out of range E-27-E-27-E-27 Out of range E-27A-E-27A-E-27A Out of range E-28-E-28-E-28 Out of range E-28A-E-28A-E-28A Out of range E-28APB1-E-28APB1-E-28APB1 Out of range E-29-E-29-E-29 Out of range E-29-E-29A-E-29A Out of range E-29-E-29A-Plan#2 Out of range E-31-E-31-E-31 Out of range E-31-E-31A-E-31A Out of range E-33-E-33-E-33 Out of range E-33-E-33A-E-33A Out of range E-33-E-33B-E-33B Out of range E-36-E-36-E-36 Out of range E-36-E-36A-E-36A Out of range CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/29/2011 4:09:27PM Page 3 of 15 COMPASS 2003.16 Build 73 /inn BPPASSPORT BAKER HUGHES Travelling Cylinder Report by INTEQ Company: North America-ALASKA-BP Local Co-ordinate Reference: Well E-20-Slot 20 Project: Prudhoe Bay TVD Reference: Mean Sea Level Reference Site: PB E Pad MD Reference: 28.50+30.61 GL @ 59.11ft(28.50+30.61 GL) Site Error: 0.00ft North Reference: True Reference Well: E-20 Survey Calculation Method: Minimum Curvature Well Error: O.00ft Output errors are at 1.00 sigma Reference Wellbore E-20B Database: EDM.16-ANC Prod-WH24P Reference Design: Plan 3 Offset TVD Reference: Offset Datum Summary Reference Offset Centre to No-Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (ft) from Plan Offset Well-Wellbore-Design (ft) (ft) (ft) (ft) PB E Pad E-37-E-37-E-37 Out of range E-37-E-37A-E-37A Out of range E-37-E-37AL1-E-37AL1 Out of range E-37-E-37APB1-E-37APB1 Out of range E-37-E-37PB1-E-37PB1 Out of range E-37_DO NOT USE-E-37-E-37 Out of range E-37_DO NOT USE-E-37A-E-37A Out of range E-37_DO NOT USE-E-37APB1-E-37APB1 Out of range E-37_DO NOT USE-E-37PB1-E-37PB1 Out of range E-37_DO NOT USE-Plan 5, E-37AL1-Plan 5 Out of range E-39-E-39-E-39 10,164.67 10,930.60 1,011.97 186.35 826.75 Pass-Major Risk E-39-E-39A-E-39A 9,864.88 11,550.00 759.00 210.34 559.30 Pass-Major Risk PB K Pad K-05-K-05D-K-05D 9,700.00 12,607.00 508.23 254.34 344.24 Pass-Major Risk K-05-K-05DPB2-K-05DPB2 9,700.00 12,532.00 561.24 269.42 395.60 Pass-Major Risk K-05_DO NOT USE-K-05D-Plan 8 9,700.00 12,512.00 573.20 269.15 415.51 Pass-Major Risk K-09-K-0913-K-09B 10,404.05 11,198.39 333.63 129.33 205.49 Pass-Major Risk K-09-K-09C-K-09C 10,771.00 10,500.00 1,003.80 133.37 870.64 Pass-Major Risk CC-Min centre to center distance or covergent point,SF-min separation factor,ES-min ellipse separation 8/29/2011 4:09:27PM Page 4 of 15 COMPASS 2003.16 Build 73 U =MD WOMMW: T LA m= w iRm7,P�s$4 ,E1$ 9$ �8�gg88888 8888 AL 4S Y SSS 9 u ! i- SI s2I - 'b'W,°RgR R4$&' O '^ ca�r z g1SS3 aFa} �zz ¢¢ € s3 !ti, z �'"�^gg &Rffi ��'� rc > �'o.w z.,10ii# ; s , 1 age ,_ ! 1- -' -E's; ss z zg[aa3af 2,1 O. h pp�p M& R 0- ii zTHc . 'r/SAss!§*h 11"VIIIIIIII!P gr'2',51$S1#a'aga!,Sasae�"1"14a8! !I Oq F A 1§111 q$a, 11 -! f ,ada,a1 aaa.3g1311111di fall a illiaasaa$a, kkli9i39,. a 3, w 3�n�8q$nw$7, -o yNwS 59349211211iySaa - S:SiliM11112155a311121Fi23232aaaaaaaszzaa93!31 u5 a E 'MAIWm�ffifd u, y 3 ,2`, `,1g. #t+#I##1#1+#/1##111#111#/#+#111+i+1+##1#+111111#+#1#/l+t#/1#++1#11#!#1# i i Iwo ss$$ w ORE $ ;11 E5 1/Y14 � imm � J,;. gzzgug a $ §#y z 3 e ° gn$$W,Pi�i W Eig? 6ahigooiyc iw 18 ,,,,,nmrmm ___ �o u 38 0 $ 8 a 0 0 0 N r 0 W N O 0 mm o 0 0 O N i O lei �. CD t3 -o Lw 0 V ^mss 111111111111111111141111111 .o Ni_ b C ry c 17111111111117. 1 I I I I I I I 1 I 11110.°111 I I I I C _. 0 N\ 0 (6 cl as E. _ ' E- oma U o Pit, c _ :--'° 2 r2 ": w V m A .: c) �� T O imili T m -- ma m u O W 3<:--=— > _ t d N �O W N E W _ aa- vn N Vr d a o N c N a a m N T U as > M N N R N R N — A 11 * e 8 V au a 41 1" a LLa e a: 1 1 c 8 = 11 0 8 n �'o" K g e 0ii ucs.it 1 10 I II 22 11 II —� I ! o UEl 1:11:11°-:44,::11.. LL. 1-1 4.. ::. ....: ,::!6 II giotiii :LI 1 i I e I 0411 a 1 I I m 3 L @ 5 U U f 1.1.. F.c — a f U (9 a L s I Q n Sia = I 4 0 = 8 U a ';'• 0 m 1 1111hU II J II . I I = I O I s Illi III U = z To I d & • - 111 ill U CQ C , LL C H """ I c A I U «�d I > I �jC Z I O_ F I U O ; - la IF J p = 111 it : E° • U 1 f LL U U I . I . /../ > © • III ..... 1 tri, . , i=ioi_ Ia la - , 11 a E 9 E i W °LIJ III o. a 11 t \ 1I 9 W6 t 0 I !' U No 1.7 I L - ,_ . _...., ii g; 11J i EI 1 o d V ., m m I ] 1NE 11/311 e . ii 1 cco II c UG lw i 113 8 0 2 t Ii1=1�u iil i! 0 1 a W T OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. TRANSMITTAL LETTER CHECKLIST WELL NAME Prudhoe Bay Unit E-20B PTD 212120 X Development Service Exploratory Stratigraphic Test Non-Conventional Well FIELD: PRUDHOE BAY POOL: PRUDHOE BAY OIL POOL Circle Appropriate Letter/ Paragraphs to be Included in Transmittal Letter CHECK ADD-ONS WHAT (OPTIONS) TEXT FOR APPROVAL LETTER APPLIES MULTI LATERAL The permit is for a new wellbore segment of existing well , Permit No. t (If last two digits in API No. 50- - - . Production should API number are continue to be reported as a function of the original API number between 60-69) stated above. PILOT HOLE In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well name ( PH) and API number (50- - - ) from records, data and logs acquired for well SPACING The permit is approved subject to full compliance with 20 AAC EXCEPTION 25.055. Approval to perforate and produce / inject is contingent upon issuance of a conservation order approving a spacing exception. assumes the liability of any protest to the spacing exception that may occur. DRY DITCH All dry ditch sample sets submitted to the Commission must be in SAMPLE no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Should conventional core be acquired in this well, representative chip samples from each foot of core must be submitted to the Commission in accordance with 20 AAC 25.071. Non-Conventional Please note the following special condition of this permit: Well production or production testing of coal bed methane is not allowed for (name of well) until after (Company Name) has designed and implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the Commission to obtain advance approval of such water well testing program. Rev: 1/11/2008 • I ❑ To N 0 0 C- a) 6 o `m 7 Tu c Q a c 7 O E a) a) n o n > L co w (n W O -o o) 7 C E O O -mo E 7 (6 coamN c d N 2 O C 2 U1 O 'o a U '3 oTo ao a) a � 3 ai L N 0 N — c c 3 0 oo Cr cn - a`a)i a) a) g O o 0 > o O 7 - 2 a U) o) co o -off a) >m c U) N c j.. d (6 > 0 D c m o S o m o @ w .N Z n vi cn a) w J in O o v a o E mw N F M 0 2 U -� a) CO 0. (00 m � d Z co d C C N O' N ('7 O a N }D O J a m m 3 A v as o c N N _ _ I r- QO - c o •n Q ' 3 n 0 0 m C W co -o < (V .N Ui N d V m o a N N C co O r = 0 c o a) W Q E m n c ca co c i I O 3 N a. < W E •C — m o M '' h a UU)i a nW d ~ a) a3 N 'C >. N a) N Q. "O IN N V1 0. CL iii .0 m w a w o) m s rn 2 'o -i ami 3 } o m m c rn rn n 3 T co n a iE Z CO mj ) _C C CO C -O o C CO m N N a0 CLLI N N N (o a) C N N 'O (n 2 .2 E C9 a) O o c. a o °co co o . n .mT m E N CO 3 a) z 3 = o m c coi co l aci Q C' E o o 0 o -o O 3 z c cc O o > > o a0i rn N o a) m co N a ° m w w 0_ 0E45 U (n (n a U LE c� a > 2 2 I w w V a o > U) w O U N N N N N N N N co N N N N N N N CO N N N N N N N (� o < < o a) Cl) a) a) a) a) a) Cl) a) a) a) < < < < < < < a) a) a) a) a) < a) a) a) a) a) a) < o a) < < < V.� nzz >- >- >- >- rr >- >- >- >- rrzzz z z z z >- >- >- >- >- z >- >- >- >- >- >- z z >- z z z "011A, T -� NO a) N •w.� T O m U N o c Ta m E E 3 - E a) o 0411,T hi o d E �, T 0 .1- w 3 m 3 0 O cn U a U C C 0 J a CO 'Z w C E N N N � (Ni "co a) N N m 2 O O O N n _ ,..7. 7 CL >, C 7 D7 o m O' .0 -O y N co O DQ "o O- N. O N U a) "0 01 co N O O CC r .' com N w 7 OCS 't N m a) co n T flCa C O Yj