Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
215-177
• Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Thursday,July 13, 2017 6:30 AM To: Wallace, Chris D (DOA); Loepp,Victoria T(DOA) Subject 9(PTD 215=177 and CD5-06 (PTD 216-077) Victoria/Chris, Operations reported that CRU wells CD5-09 (PTD 215-177) and CD5-06(PTD 216-077)are flowing an estimated quart to gallon of water per day to surface through the surface casing by conductor annulus. CPAI suspects this water to be from the same shallow source water that was encountered on CD5-313 (PTD 215-084). We will take initial samples for analysis and collect water at the wellhead to monitor the flow volume. Please let me know if you have any questions or disagree with this plan. Thanks, Travis Smith/Rachel Kautz Well Integrity Supervisor,ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 SCAN NED AUG 0 8 R17, • S Ill""r . . 2 ► f -T"7 ConocoPhullips Alaska RECEIVED P.O. BOX 100360 ANCHORAGE,ALASKA 99510-0360 JUL 0 1 2016 June 26, 2016 Commissioner Cathy Foerster Alaska Oil & Gas Commission 333 West 7th Avenue, Suite 100 Anchorage, AK 99501 scANNED DEC 0 92,016 Commissioner Cathy Foerster: Enclosed are the spreadsheets with a list of wells from the Alpine field (CRU). Each of these wells was found to have a void in the conductor. These voids were filled with cement if needed and corrosion inhibitor, engineered to prevent water from entering the annular space. As per previous agreement with the AOGCC,this letter and spreadsheets serves as notification that the treatments took place and meets the requirements of form 10-404, Report of Sundry Operations. The attached spreadsheet presents the well name,top of cement depth prior to filling, and volumes used on each conductor. Please call MJ Loveland at 907-659-7043, if you have any questions. Sincerely, MJ Loveland ConocoPhillips Well Integrity Projects Supervisor .- • • ConocoPhillips Alaska Inc. Surface Casing by Conductor Annulus Cement, Corrosion inhibitor,Sealant Top-off Report of Sundry Operations(10-404) Alpine Field Date 6/26/2016 CD5 PAD Corrosion Initial top of Vol.of cement Final top of Cement top off Corrosion inhibitor/ Well Name API# PTD# cement pumped cement date inhibitor sealant date ft bbls ft gal CD5-09 50103207230000 2151770 27" 0.16 12" 5/29/2016 6.2 5/30/2016 CD5-10 50103207240000 2151790 71" 1.38 13.5 5/29/2016 7.56 5/30/2016 CD5-11 50103207260000 2151980 34" 0.65 11" 5/29/2016 5.96 5/30/2016 0 0 o `0 o • o 0co Co 0 O 6 c, co SIco I I— I— F— I— I— N o cC P. N Z �I �I WI , a • d o c >- 030,- 0 0 0 0 0 0 co ca!) 0) co �I UI UI 4 i 0 UU 0 0 0 0 02 W W W 0 0 0 0 c a a) ai 0 t u In ci m a) a a a H I- I- I-- Z ZI E.- Eco ECo ECo E - E0- - - - g g g g a U) co N M1 c V CO V co • c 30 c,- I- H 1— ._`. W Q a W. Q a)< a)co a) a)cO to= a) I I I . I I I I Y rn 0 U) 3 0) 0) 0) 0) 0) rn 0) 0) To Co LL.e LL M iL M LL M Eo O.- O O m O 2 'U ^N1 'NI 'N1 CI -�1 If)-0 0. 1 IC) Lo QI If)-oo IC) E m N a)M ..... 4- a),0 m m N 0 u) 0 I[) 0 IP) 0 w 0 0 a 0.-I J 0 o (O °0 00 00 00 W0 U— U— U— U a 0.E 06 00' 02 o o cal— m I co1 co I a) I coI U U U I ✓ — 0 c0 @� mCo Co mco Co m(r N W W W yui Qjln aiZ �Z Z 0 £ 0W OZ 0Z OZ 0Z OZ LLD iL0 LL0 LL5 ii5 iL1t Lt Y▪ N a • 0_1 0< 0< 0< 0< 0< o M 0 M .07) O W OW U U 0 E 'E a "E -' 'E-' 'E - 'E 'E- 'E I 'E I 'E I 'c 0 'E 0 'E o 'E o N i rn o o f 00 00 20 20 00 2Z 2Z 2Z 2— o0 oa1 oat cn V o H v 10 I i) I i� I i� I %) i. i� i) 10 I i)g i.)g Q a)of a)Li- a)u- a)u- a)u- a)u- o0 o0 o0 a)O a)O a)w °9w Ce y I 0 mm o W W W W UJ lL<n lL to 111<A W U lL U lL H lL H ON •V a d ' c Cfl Cfl (0 c0 CO CO CO CO CO CO Co Co CO CL a) > 0 0 0 ,- 0 ,- 0 ,- ,- 0 ,- 0 0 C6 'd N N NNNNNNN NNNN W d Ca N N N N N N N N N N N N N Co' w N N N N N N N N� NNN NN N O -0 W z Or.. J _ _ C� v o 00 Z Q O G Mt0 IC) _W N- 0) co co .O. t6 N N. o0 co CO co co it z J/� 0 w d U O `i t0Z = o C r I', o COO 0 0 0 0 0 GO m w r0m 0 N a a) o E a E v Vet co 0 Co c o ...J a) = 0 o X Z en Qin s O toco H �' Z N j J '2 N CD CO > N 00 W — M w 0 0 J (`(� V) J a F a. Q 0 O '',I 1 1- N O Q ZIo .. 0 E o 0 d U co E J ii 1 co Z z o 1 g CoCo Co Co co CO Co Co o) co co m co a) ,0 Co Co Co Co Co Co m m Co Co CO Co co 0 E E 0 0 0 0 0 0 0 0 0 0 0 0 0 re Z!�a �a CO :° :° :° m �a m co o0 Z O� , ` ID 0 0 0 0 0 0 0 0 0 0 0 0 t` > '', 0 W 4) °) Ic0 co co co co co co co co co co co co n I— L w to -0 In In U) In In Lr) In In In IC) to In Lt) Q I Z t c 0 is E c)'0 ccoo cn0 coo (00 r-- c(0 (00 coo o (00 r-- o N m Ce O 0 ww o z N N N N N N N N N NNN N LL V Co Z ` C.Mj W O VOs- - MI �I "' N I'I Z W C 2 U 0 0 0 0 0 0 0 0 0 0 0 0 UU. .£ 1 = < W J a O a u) c m +° a 0 0 0 0 0 0 0 0 0 0 0 0 0 0. M 1 Z cl H i JDi_>.,W W W W W W W W W W W W W • • o O 0 o as o • 00 M N N N N N oi o ra c0 (0 N Q 'Z' es Z O.. Ln uS 6 to JI CL N o 0 5 0 o 0 8 0 o 0 o Q U O U O O o U O U U ;M U 2 Ip 10 IO Ip I I N Cl) Cl) a)o > ' • • _ > CL _ aEo0oO bC . • N JJJJaN 0 0 0 0 0 D 6 O Da 6 0 1 0 1 0 1 0 10 U n (n i HM M M M M c')-(L) MoM < < < < < 3 n_ n n_c H z 2F (' H H H Ho H . Hw25 Ea < _iQQ U ' f f EEEEooo= o Q do lol� l w"O LL I a 1 LL ' aco I co I as I as IOQcoC C C C CLL r N N 1' • 0.,1 ,I3rn1rn a) .2.), cc aDfr '2w c2ce ° U UO UO VoUo moo rnrnrn ' rn O M O M O Ot O O 0 O 0 O CO LL I LL I LL I L I it I LL I IOIO10 10 N IN YC C N _.:. Z Z .? w 0 0 0� 0 '10 CI 0 �1 0 6' D a 0 0�I 0NI 0 Ml N.> N > N > N > a) > Cl).? a > a> a > a� 'J 00 00 0 .E ow 0E_ 00 00 00 of) C ; of) w N CO N ' N UJ UJ 0 -1I0- p 1 1 1 1 1 1@•- Lp-- m•- m - (p•- (p - I N(o Qj(0 Qj O N co y co_ y(o pj co Qj co N N N N N N hi g N 2 ai 2 N 2 Z LLZ LLZ LLZ LLZ LLZ LLZ LLZ LLZ 0 Q' 0 d' 0 LL' Oct 0 d' 0 et LL �1 LL -1 LL�1 LL �1 — N 0 < 0< o< o< o< o< o< o< o m o O> o 0) 0o o o o 0) 0 _0 o � 0 > -' -� a n a n a n y C C C C C C C C C C C C C C C '> C �> C'> C '> ��// m 2 0 2 0 E o E o E o E o _2 O E o E S 20 E S `E S 2 5 20 2 (Ti E' E' `2 LL J oat oat , 1 6LL1 oat oat oat oLL1 o� -r,u) o� r)u) o� r.,u) o N o N o N t-, N N N N N N O) N O) N N 1 N N I N 1 N 1 N N N O) Q D2 W 2 E2 D2 I2 w 2 I2 M2 w o ES MS IS IS ES IW w cC w cC w w 112Oaco co co (o U) co co co U) co U) U) U) co co U) U) U) CL J 0 0 0 0 0 0 0 0 0 0 0 0 5 5 0 0 0 N N N N N N N N N N N N N N N N N N W = N N N N N N N N (�) M M Cr) M M M M Cr) CO AI O N N N N N N N N N N N N N N N N N N Ci 0 Z A W z J Z • O V N O 0 O Q :6". N CO N co CO N M M M n > N Cr)CO CO Cr) CL CO N N N co Ci (n C V N CCco OTr CV G O Tr N N CO N v a O � E , (..) 5-1 O v CJ Nr o Jcn N Q O b an c csCt. 00 r_ I- o 5 Z N G/ > M � > N W re CV p w J N CO N, J (13 Q O C U g r Q C n Z_ Eo 0 6 U E co Z (6 (a @ co (6 co @ co c6 m co (0 (o co co co @ co N c6 co co co (6 @ @ co (0 co co (a (0 (9 @ co co co O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co co c6 co (v co @ @ co (6 co co (a co co co co (6 @ co 0 5 o) o) To 5 � 0 o) rn rn o) o) rn 0 o) o) o) O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 r > (o (o co (o co co o co v v v v v v v v v v I- in to in to Lo co co an r` N- N- N- N- N- r r` r` r` T h N- r N- N- N- N- N- r N- r N- N- N- N- r r rIn co co co co co co co co co co co co co co co co co co a N N N N N N N N N N N N N N N N N N N o N U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w C7 E 0 d 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 2 W W W W W W W W W W W W W W W W W W • • o 0 0 N o 0 M 1 • N O N Z • 1 0. N • • . • 43 . . ,� r A U a) a) a) a) a) a) a w a "'' n. w a ... N ca CC •G O O O O O O IC " 1 �` Q v 1 I I I Z • o _ I InI_ nI1 I I 0 0 I0 0 > > mo ! - f 0 0 H 0 0 H cZ o � oLo !� o. oo2E 2E 2E 2E -a Cv c c c) u)• ( u)ill LO ,n ,n ,n 1 6 1 6 1 6 1 6 1 6 I 6 I 6 I 'E a '� a m CO CO F. 000' 0r0 0 0 0E 0 05 0,7,c 05 05 O 7 p-o p-a 0 0 2 Q VIR c)c) VIo VIo VI VI VI >, VI>,, UI>,I UI>,I VI>.1 VI >,I UI >, UI >,, 0 E o g O o 0 —) 0 -I U-I 0 JI 0—JI 0-o 0 L O N O O. 0 0 15 0 15 U N 0 0 5 O r`1 OM1 0 0 0 V O ai 2 hi 2 ui 2 ui 2 ai 2 iii 2 ui• m aim aim aim aim aim iri m aim ai 0 ai CO ai ui ai CL' LL W' �• �' W �' ` � `� 5 � i � � � LL � � LL Q LQZ L Z LLI ILILLI L- ILLILLILLILL IL1LLILLI ILL IZLZLLL LL - N O > O > •O > •) •U w .o w •Ca '0 aa 'U a '. aa 0 O 'ca 'U a 'U ca U •U U .0 0 > C ? gzs.) C2O.) C ! OV CV CV OV OV OV OV OV OcI Cc` C O O I - NQ mi% m mm 5 Vc) � ttt5. 0-iz0'N 0' 0'y i' ou) u) On0� vu) 0u) 0� u) 0 naN aaa) a) y a) a) a) ya) II Ia) I a) Ia) Ia) Ia) aaa) a) Ce Wd) W�) WLLWILW2mw ITS Wo) LIS WO WC) mg WrnWrn WO) W(7W W W O W °. ' co O CO CO CO CO CO CO CO CO CO CO CO CO CO CO Co CO CO 0. J " 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 JN N N N N N N N N N N N N N N N N N N W = M M CO CO CO CO M M M CO M M i.e.). CO M M M M M AI 00 N N N N N N N N N N N N N N N N N N N ii W z q`' q' O. 4, V o O 51 Z Q J o R ' � I 0.. CO o I N G r. a • N E c U V U o J o M Q oas an as H I- LC) 01 Z NI > M • N W ET N M LU J y Cl)v/ > 0 Q J V O ra) Q o a Zo 0 m 1 Z _ 1 m m m m m m m m m m m m m m m m m m m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO O) 'p) 'p) 'Q) 'E) 'p) '0) •O) '0) 'p) •m •O) •o) •m •C) p) p) •p) •p) C 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ti > v v v v v v v v v v v v v v v v v v v H r- N- N- n N- I N- r` N- N- N- r` N- N- r` N- N- N- N. 7- N. N- N- N- N- I N- N- N- N- N. n N- N- r- N- r r` N- CO CO (O CO CO CO CO 0cO c0 Co CO (O (0 m c0 CO CO CO r N N N N N N N N N N N N N N N N N N N N O• co C) 'O U E 0 a WWWWWWWWWWWWWWWWWWW M • • o o0I 0 N C, ,iQ1� Q o0 M \p 1 N 1 ra M U N ♦ N 0) a) Q o n 0 O N a) >c o N a 6 b Q z 0 a a) , i, in y ^ Z , m U f6 c 1 I o N N - U) o Q F- a Z Z U Z Z z o vcs 0 F. a ao co co j c a m AQ 9 0 0 0 0 -° ' i� L() l!) 10t1) 10 W ° ° @ O 0 0 0 0 0 0 J0 0• 0 0 0 J ,' Z a) N a) a) N J C `�c.J Z it it LL LL Il .1.":: N U U U U C.) U a1 \ \ E ui N o 0 0 0 0 �� E } } } w N J N N N N N `"W V @ N 1X N W W W W W N 2 p@ O d U- d d U 'co o m m m aa) a woo CI. EU) E 0) — N N N N N D 7 0 O LU d 'M CO M M M H Z y U) A/ N N N N N • I6 i� 0 it E o u) W z J 'I co o n V 0 Q E 3 E z la ,— d as N :? � o Q m o t o oa Jo E Om c d 2 0 0 fi _ N 0 0 C O � EH V N U j (1) c w cn 0 } 0 a) i: i ,i- cu v Q 9 ° ° ato V Q- v �n o E H o N o Z N co c 2 = > M CV a) a) a) COcvW C O ~ E 1 W t ...7.. 7 Cl) a) R Cco a)V/ > N co H c c 0 0 1 Q OC _63 @ O f6 O 11 °) ° n- ICC CZ oO ° m O 2 .-Cr) U 6f0 I E D D v Z (I) 1 co a) CO CO a) 4) I'1 LI) a) CD C6 Cif CCI C6 0 c• o,) 0 0 0 0 D a) E Q II N N co CO CO f6 CO (6 i 0 Z N _co O) O) O) O) _a O l6 } N o 0 0 0 0 0 0 E 0� j1 T � > V a 7 - v 7 w W CO a ▪ ~ N. n N. N- N. �CO W E n Z m ✓ N N N N COIn CO CO CO CO N a) W p` ° N N a a1 re O C N = aj � .> 9 9 Z m N i W m of ai Q O C d re O M m Z Q O Q Z O CO 0 O C C U "' N U U U U U U C a) U - J N a) .2' a) R U 0 a 7 O a a m o E �a 0 0 0 LL O oa) o Q E rn 0 E o 2 E o H E 9 a� w w w w w $ z 0 a 0 0 O ce o 0 0 2 7 1 5 6 STATE OF ALASKA HECEIVED ALGA OIL AND GAS CONSERVATION COMOION REPORT OF SUNDRY WELL OPERATIONS APR 1 1 2016 1.Operations Abandon U Plug Perforations H Fracture Stimulate H //''''�� Pull Tubing ❑ p Fadown H Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well H Other: ❑ 2.Operator ConocoPhillips Alaska, Inc. 4.Well Class Before Work: 5. Permit to Drill Number: Name: Development H Exploratory ❑ 215-177 3.Address: P.O. Box 100360,Anchorage,Alaska 99510 Stratigraphic❑ Service ❑ 6.API Number: 50-103-20723-00-00 7.Property Designation(Lease Number): 8.Well Name and Number: ASRC NPR4,ASRC NPR2,ASRC NPR1 CRU CD5-09 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): Colville River Unit/Alpine Pool 11.Present Well Condition Summary: Total Depth measured 23,381 feet Plugs measured None feet true vertical 7,330 feet Junk measured None feet Effective Depth measured 23,371 feet Packer measured 12,545 feet true vertical 7,329 feet true vertical 7,304 feet Casing Length Size MD TVD Burst Collapse Structural Conductor 78' 20" 115' 115' Surface 2,372' 10-3/4" 2,409' 2,170' Intermediate 13,237" 7-5/8" 13,271' 7,418' Production Liner 10,251' 4.5" 23,371' 7,329' Perforation depth Measured depth N/A feet True Vertical depth N/A feet Tubing(size,grade,measured and true vertical depth) 3.5 L-80 13,113'MD 7,407'TVD Packers and SSSV(type,measured and true vertical depth) Backer Premier Packer HYD563 BXP 12,545'MD 7,304'TVD Baker HRD-E ZXP Liner Top Packer 13,096'MD 7,406'TVD 12.Stimulation or cement squeeze summary: Intervals treated(measured): 13,851 -17,185, 18,829-21,314 Treatment descriptions including volumes used and final pressure: Total Well-10 Stages,781k lbs proppant placed. IISIP-3,879 psi.See schematic for full frac details 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 912 - 24 811 361 Subsequent to operation: 4,163 - 79 1,659 257 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) J�• 15.Well Class after work: v Daily Report of Well Operations ❑✓ �N Exploratory Development❑✓ Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ NA 16.Well Status after work: Oil ❑✓ Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑✓ GSTOR ❑ WINJ ❑ WAG ❑ GINJ ❑ SUSP❑ SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 316-096 Contact Robert Blakney @ 907-265-6417 Email Robert.G.Blakneynaconocophillips.com, Printed Name Robert Blakney Title Completions Engineer Signature LZ--... Z__. L____---- — Phone 265-6417 Date IIT- i11 // _ thtet Form 10-404 Revised 5/2015 f �* W J 312/2,01 b 12-cc-et Submit Original Only ---�, l RBDMS LI/ AH1 1 2018 45-09 M DTTM JOBTYP SUMMARYOPS START 3/15/16 FRACTURING Stage 1 —74/72k lbs (103%) @ 26 bpm Stage 2—0 lbs placed Stage 3—72/72 (100%) @ 26 bpm Stage 4—73/72 (101%) @ 26 bpm ISIP—3,909 psi @ BHG Day total—219k lbs placed, 76% of design 3/17/16 FRACTURING Pumped stages 5-10, 562,400 lbs total. Stage 5 -90/90k @ 26 bpm Stage 6 -90/90k @ 27 bpm Stage 7 - 90/90k© 29 bpm Stage 8 - 90/90 k @ 30 bpm Stage 9 - 85/90k @ 30 bpm Stage 10 -116/115 @ 30 bpm ISIP-3,879 psi @ BHG Well Total - 781k lbs placed, 92% of design Well is freeze protected and ready for slickline. 3/25/16 FRACTURING RECOVER MISSING TREE SAVER ELEMENT FROM TBG @ 4384'SLM. CHANGE OUT w/ NIGHT CREW. IN PROGRESS... 3/26/16 FRACTURING BRUSH & FLUSHED TBG DWN TO D NIP @ 12573' RKB w/ FULL BORE BRUSH, 2.84" G-RING. SET CAT SV @ SAME. PULLED 1" DGLV @ 12399' RKB. CHANGEOUT TO HERRON. IN PROGRESS 3/26/16 FRACTURING SET 5/16" OV @ 12,399'RKB. PULL DV @ 9074'RKB. SET 3/16" GLV(1805 TRO) @ SAME. PULLED DV @ 4798'RKB. SET 3/16" GLV(1891 TRO) @ SAME. PT VALVES TO 2500PS1. PULL 2.81" DS CAT-SV @ 12,573'RKB. JOB COMPLETE. a WNS D CD5-09 ConocoPhillips a Well Attribute Max Angleilli TD Alaska Inc. Wellbore APUUWI Field Name Wellbore Status ncl(') MD(ftKB) Act Btm(ftKB) Car10ceVhi9ips 501032072300 ALPINE PROD 95.16 17,122.24 23,381.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) Rig Release Date HORIZONTAL-CD5-O9,417/20163:58:11 PM SSSV:NIPPLE Last WO: 36.69 12/23/2015 Vertical sphanWp.(ac4wp Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag: Rev Reason:FRAC INFO lehallf 4/5/2016 HANGER.31.4- 'I' ".� Casing Strings Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I...Grade Top Thread 4yyya„,, , s.,,.„,,.,,,.,.,,.,,,,,,,,.,,,�.„., „a ,001101001CONDUCTOR 20 19.000 36.7 115-0 115.0 78.60 L-80 Welded 1T• O_f Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread SURFACE _ 10 3/4 9.950 36.8 2,409.2 2,169.6 45.50 L-80 Hyd 563 • Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(ND)...'Wt/Len(I...Grade Top Thread o E7 5,INTERMEDIATE _ 7 5/8 6.875 34.5 13,271.7 7,418.4 29.70 L80 BTCM CONDUCTOR;36.7-115.0 I Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread xo Reducing,121.0 LINER 4 1/2 3.958 13,096.6 23,371.0 7,329.3 12.60 L-80 IBT-M it Liner Details Nominal ID _ Top(ftKB) Top(ND)(ftKB) Top Incl(°) Item Des Com lin) NIPPLE;522.0 13,096.6 7,406.0 85.89 PACKER Baker 5"x 7 5/8"HRD-E ZXP Liner Top Packer 5.250 w/5.25"ID PBR 11.07' 13,117.9 7,407.6 85.87 NIPPLE Baker 5"RS Nipple 5"Hyd 563 Box x Box,180 L-80 4.000 13,120.4 7,407.7' 85.87 HANGER Baker 5"x 7 5/8"Flex-Lock Liner Hanger Hyd 563 x BTC,18#L-80 4.180 1 SURFACE;368-2,409.2-� l 13,135.2 7,408.8 85.85 XO Reducing Cross over,5"BTC-M x 4-1/2"Hyd 563 3.890 13,732.1 7,418.3 90.66 SLEEVE Camco 4 1/2"Sliding Sleeve,IBTM B x P 2.750""D" 2.750 GAS LIFT;4,799.3 profile,open dwn AB 13,851.2 7,416.1 91.60 FRAC PORT Sleeve,Frac Assy#10,4 1/2",Ball Act, 2.093 2.125"(2.093(D) ' 14,527.0 7,408.7 90.84 FRAC PORT Sleeve,Frac Assy#9,4 1/2",Ball Act, 2.035 iir 2.063"(2.035"I0) GAS UFT;9,074.1 [ 15,228.5 7,393.8 91.13 FRAC PORT Sleeve,Frac Assy#8,4 1/2",Ball Act, 1.954 aiii MI 2.000"(1.9541D) it 15,961.3 7,400.4 88.30 FRAC PORT Sleeve,Frac Assy#7,4 1/2",Ball 1.890 GAS LIFT;12,399.e T. Act,1.938"(1.890"ID) AB 17,184.4 7,381.1 93.71 FRAC PORT Sleeve,Frac Assy#6,4 1/2",Ball 1.830 Act,1.875"(1.83"I0) elm GAUGE;12,488.4 17,987.9 7,383.7 89.49 FRAC PORT Sleeve,Frac Assy#5,4 1/2",Bali 1.780 Jai Act,1.813"(1.78"ID) 18,828.9 7,383.9 92.40 FRAC PORT Sleeve,Frac Assy#4,4 1/2",Ball 1.705 XO Threads;12,534.7 L Act,1.75"(1.705"I13) PACKER;12,545.0 {I 19,675.3 7,346.0 91.38 FRAC PORT Sleeve,Frac Assy#3,4 1/2",Ball 1.670 X0 Threads;12,553.0 Act,1.688"(1.67"ID) NIPPLE,12,573.6 Efi. 20,476.6 7,353.1 89.52 FRAC PORT Sleeve,Frac Assy#2,4 1/2",Ball 1.575 Act,1.625"(1.575"I0) • 21,313.9 7,356.7 90.23 FRAC PORT Sleeve,Frac Assy#1,4 12",Ball Act, 1.520 LOCATOR;13,092.2 )' 4 1.563"(1.52"ID) 23,355.5 7,328.3 85.99 FRAC PORT Joint,Pup,4 1/2"12 69,L-80 IBTM Pert.(36)=.5" 3.900 SHOE;13,112.1 holes Tubing Strings O. Tubing Description String Ma...ID(in) Top(ftKB) Set Depth(ft..f Set Depth(TVD)(...Wt(Ib/ft) Grade Top Connection YJ TUBING 31/2 2.992 31.4 13,11311 7,407.2 9.30 L-80 EUE-M Completion Details Nominal ID Top(ftKB) Top(ND)(MB) Top Incl r) item Des Com (in) 31.4 31.4 0.00 HANGER Hanger,FMC 4 1/2"Metal to Metal Seals Drifted to 3.86" 3.908 INTERMEDIATE;34.6-13,271.7 121.0 121.0 0.28 XO Reducing XO,4-1/2"HYD563 Box x 3-1/2"EUE 8rd-mod Pin Drifted 2.992 t 2.91" 522.0 521.6 4.16 NIPPLE Nipple,Landing,3-1/2","DS",2.875",EUE 8rd-mod 2.875 i 12,488.4 7,286.9 71.65 GAUGE 3-1/2",SLB Solid Gauge Mandrel with I-wire 2.920 12,545.0 7,304.0 72.85 PACKER Baker Premier Packer HYD563 BxP 2.880 12,573.7 7,312.4 73.31 NIPPLE Nipple,Landing,3 1/2",DS,2.812",EUE 8rd-mod 2.812 13,092.2 7,405.7 85.90 LOCATOR Locating Sub(.49'to shear pins,1.44'to 6.39"No Go) 3.000 11 7 13,112.1 7,407.1 85.88 SHOE Baker WLEG,muleshoe 3.480 { Stimulations&Treatments tl r1 Min Top Max Btm Depth Depth Top(ND) Btm(ND) Hydraulic Fracture;13,851.0 (ftKB) (ftKB) (ftKB) (ftKB) Type Date Com 13,851.0 17,185.0 7,416.1 7,381.1 Hydraulic 3/17/2016 Stage 5-10.562,400 lbs of 16/20 carbolite-100%of 11 L` Fracture design 1 18,829.0 21,314.0 7,383.9 7,356.7 Hydraulic 3/15/2016 Stage 1-74/72k lbs(103%)@ 26 bpm Fracture Stage 2-0 lbs placed 26 bpm S L$ Stage 4-73/72(101%)@ 26 bpm L ISIP-3,909 psi @ BHG Day total-219k lbs placed,76%of design IMandrel Inserts 1_l st 11 I ! Top(TVD) Valve Latch Port Size TRO Run N Top(ftKB) (ftKB) Make Model OD(in) Sery Type Type (in) (psi) Run Date Com .h (u 1' 4,798 3 3,414.4 Camco KBMG 1 GAS LIFT GLV BK 0.188 1,891.0 3/26/2016 GLM I 2 9,074.1 5,589.1 Camco KBMG 1 GAS LIFT GLV BK 0.188 1,805.0 3/26/2016 }3 [1:. GLM Y-1 3 12,399 6 7,257.0 Camco KBMG LIFT OV BK 0.313 0.0 3/26/2016 Hydraulic Fracture,18,829.o I GLM Notes:General&Safety End Date Annotation .n. 0: r: NOTE'. LINER;13,096.6-23,371.0 I I S Hydraulic Fracturing Fluid Product Component Information Disclosure Job Start Date: 3/14/2016 Job End Date: 3/17/2016 State: Alaska County: Harrison Bay Frac API Number: 50-103-20723-00-00 FOCUS Operator Name: ConocoPhillips Company/Burlington Chemical Disclosure Registry Resources Well Name and Number: CD5-09 Longitude: -151.22384500 i Latitude: 70.31352700 � � CII&Gas Datum: NAD83 UranenalaSSZI Federal/Tribal Well: NO True Vertical Depth: 7,330 Total Base Water Volume(gal): 468,805 Total Base Non Water Volume. 0 Hydraulic Fracturing Fluid Composition: Chemical Maximum Maximum Abstract Service Ingredient Ingredient Trade Name Supplier Purpose Ingredients Number Concentration in Concentration in Comments (CAS#) Additive HF Fluid (%by mass)** (%by mass)** Sea Water Operator Base Fluid NA NA 100.00000 81.57550Density=8.560 BE-6 MICROBIOCIDE,Nalliburton Additive,Biocide, CL-22 UC,CL-31 Breaker,Crosslinker, CROSSLINKER, Gelling Agent, _OSURF-300D,MO- Microbiocide,Non- 67,OPTIFLO-III onic Surfactant,pH DELAYED RELEASE Control Additive BREAKER,SP BREAKER,WG-36 GELLING AGENT NA NA CarboLite 16/20 CarboCeramics Proppant NA NA LVT-200 Penreco Additive NA NA Ingredients shown above are subject to 29 CFR 1910.1200(i)and appear on Material Safety DataSheets(MSDS).Ingre ients shown below are Non-MS rlazardous and Non- Hazardous Ingredients Ceramic materials and wares, 56402-68-4 100.00000 15.88840 Chemicals a • -lydrotreated Distillate,Light.. 64742-47-8 100.0000C 1.9468E 29-16 _ 3uar gum 9000-30-0 100.0000C 0.2538C Water 7732-18-5 100.0000C 0.15063 3orate salts Confidential 60.0000C 0.05832 potassium formate 590-29-4 60.0000C 0.05833 Ethanol 64-17-5 60.0000C 0.0467E Oxyalkylated phenolic resin Confidential 30.0000C 0.03118 Sodium hydroxide 1310-73-2 30.0000C 0.0285C 'otassium metaborate 13709-94-9 60.0000C 0.02648 Heavy aromatic petroleum 64742-94-5 30.0000C 0.02335 naphtha Ammonium persulfate 7727-54-0 100.00000 0.0183C 3entonite,benzyl(hydrogenated 121888-68-4 5.0000C 0.01265 tallow alkyl)dimethylammonium stearate complex Crystalline silica,quartz 14808-60-7 30.00000 0.00555 Cured acrylic resin Confidential 30.00005 0.00545 Surfactant mixture Confidential 1.0000C 0.00508 Poly(oxy-1,2-ethanediyl),alpha-127087-87-0 5.0000C 0.0039C )4-nonylphenyl)-omega- ydroxy-,branched Naphthalene 91-20-3 5.0000C 0.0039C Silica gel 112926-00-8 1.0000C 0.00254 Potassium hydroxide 1310-58-3 5.00000 0.00221 2-Bromo-2-nitro-1,3-propanediol 52-51-7 100.00000 0.00195 Sodium chloride 7647-14-5 1.00000 0.00192 Sodium glycollate 2836-32-0 1.00000 0.00097 Acrylate polymer Confidential 1.00000 0.00097Denise Tuck,Halliburton, 3000 N.Sam Houston Pkwy E., Houston,TX 77032,281- 871-6226 Sodium carboxymethyl cellulose 9004-32-4 1.00000 0.00097 Sodium persulfate 7775-27-1 100.00000 0.00081 1,2,4 Trimethylbenzene 95-63-6 1.00000 0.00078 Crystalline Silica,Quartz 14808-60-7 0.10000 0.00025 Sodium sulfate 7757-82-6 0.10000 0.00000 'Total Water Volume sources may include fresh water,produced water,and/or recycled water **Information is based on the maximum potential for concentration and thus the total may be over 100% Note:For Field Development Products(products that begin with FDP),MSDS level only information has been provided. Ingredient information for chemicals subject to 29 CFR 1910.1200(i)and Appendix D are obtained from suppliers Material Safety Data Sheets(MSDS) yOFT4 • ' s� THE STATE Alaska Oil and Gas tip►." i � fALASI�;A o Conservation Commission __ � Sf 333 West Seventh Avenue - Anchorage, Alaska 99501-3572 rh, GOVERNOR BILL WALKER 9 Main: 907.279.1433 OF ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Robert Blakney Completions Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-09 Permit to Drill Number: 215-177 Sundry Number: 316-096 Dear Mr. Blakney: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Agit ,p2ti4v.t( Cathy . Foerster Chair DATED this !7 day of February, 2016. RBDMS L-A- FEB 1 9 2016 0 STATE OF ALASKA • FEB 04 2' ALASKA OIL AND GAS CONSERVATION COMMISSION 073 2 i 7 1 / , APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1.Type of Request: Abandon ❑ Plug Perforations❑ Fracture Stimulate ❑✓ ' Repair Well ❑ Operations shutdown❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2.Operator Name: 4.Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Exploratory ❑ Development ❑✓ - 215-177 ' 3.Address: ❑ 6.API Number: Stratigraphic ❑ Service P.O.Box 100360,Anchorage,Alaska 99510 50-103-20723-00-00 • 7. If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A CRU CD5-09 ' Will planned perforations require a spacing exception? Yes ❑ No ❑✓ 9. Property Designation(Lease Number): 10.Field/Pool(s): ASRC NPR4, ASRC NPR2, ASRC NPR1 Colville River Unit/Alpine Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD Effective Depth MD: Effective Depth TVD: MPSP(psi): Plugs(MD): Junk(MD): 23,381 ' '7 )L1�.4 D( , 23,371' . 7,329' • 7,000' Casing I) /w; Leflgth Size MD TVD Burst Collapse . Structural Conductor 78' 20" 115' 115' Surface 2,372' 10-3/4" 2,409' 2,170' Intermediate 13,234' 7-5/8" 13,271' 7,418' Production Liner 10,251' 4.5" 23,371' 7,329' Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): See Attached Schematic See Attached Schematic 3-1/2" L-80 13,113' Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): LEM INSTALLATION no SSSV 13,096 MD/7,406'TVD 12.Attachments: Proposal Summary Q Wellbore schematic Q 13.Well Class after proposed work: Detailed Operations Program ❑✓ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ Development E Service ❑ 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: March 1st,2016 OIL 0WINJ r,WINJ I .,WDSPL ❑ Suspended CI16.Verbal Approval: Date: GAS ❑ WAG ❑ v GSTOR ❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Robert Blakney @ 907-265-6417 Email Robert.G.Blakney@conocophillips.com Printed Name Robert Blakney Title Completions Engineer . kejki L c00t Nati\ L.) Z. /L.I LCk Signature Phone 907-265-6417 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical IntegritylTest ❑ Location Clearance ❑ Other: Pre Job 4ul 1 CQ SIr,� 1D rhe !'C/Sk/ �b 3 _ Sopsi_ Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No E' Subsequent Form Required: — 9 04 RBDMS LU FEB 1 9 2016 APPROVED BY Approved by: �/5 COMMISSIONER THE COMMISSION Date: 2—(7//J/O Submit Form and Form 10-403 Revised 11/2015 0 r I a io isvalid for 12 months from the date of approval. Attachments in Duplicate VIZ. 2//7/!6 /A L (-N 22/x'/20/4 . 4 Z-/c:,.(c • • WNS PROD CD5.09 ConocoPhillips wen Attributes Max Angle&MO TO 1{,33433 " 4,41111:11*P5C14I FINS MXn* Orseb:as Stslss 21'I N31,021 24etm;rtKE: 5_332_72::_ .4.:c1+4E R_`.7 --- '::T'e911 1125 147, _ata 4.745:st.1 5133123 4f.3321;114 'Fpi-4222 3 2 313 -SS-AV.7 354: 22:2. .ansa z.mw..2t2 -4.7,-- ,s, 33422y8K51 6.1,2 Gies 1.netrr1 2114:11: Ell 24:9 __- -_s:Ta .a= ._,.,,_ __ 332:-: 3:21,3. -a', Y ?.asmg Strings [ 22441 7apxlp41GF 32132: IC:21! 724.tICIC Sat 2,40.:rtKe: 421 twitMT 33.,'et.,:4..Grata T54 ranot2 C-C. -- '3::_: 257 - -- 25: memarlame__ -- a �I G_.rN!Caralpal t 01;m: Cel '1'n'FtKMI 1st 2401IIKe 23pt*1 Ca :'rr33 *vim L... 7:1F T4nsa 1 .5: 34.3 2 4:9: -4•,..,5E2 ern;C4,2cr1pt r 32:141 1) pt 141 544 MICE; Sat 24 ;1tKE: Set Csp6 MCI_MI 3.7.42329 T4.4 TSF7.311 IN-E..4741.1.4-.= 7.fi 5 37! 345 7.4754 2E 7: _:`.1 CCYCLCral:ac7.171.J t4.11¢24aplpt4':r 32 275 SC::M: T.[:ttKEt Sat Cactr'RKE: Sat 1:404$tcII 46434;3.,02223 7,4 T223ffi ovor,c2m _ LIN_= 4?;2 3323 9 ' 3. 65 7.323.2 2._:_,._ .27!71 II Liner Details � .4.47717.•t: 4IR .r 2333. r: _ ttrr _ vl 7.144.,54 3.3.24. 3322. -,r .h^.t;E - i _4..7 _-a.<_ 5.25:AI :_:-273 7.4:7.5 3237 !SIPPL5 2.32 .=._ _c.,-a_-12 4:DDD Q _41:4' 7.437 7 35 57 4..3143£4 - - __ _ _ __:?c 41213 21 215_7 ._11 252 74:3;7 3-35=R. s; ! ._-_ 7E3 3.89., 21 7.4.7.3 z.._ SLEEVE - 2,:i_.:-;-3_.=_ 22'24,,21275..1.' 2757' MI __ 7,4-5- E.._ -46;-P7.I4- __2 _ .2 ' 2.393 2337 3333 .2 -_27:4:::=E4,...-: 2232. Iill 5 7 3 A FRAC 434 2^_3,313 - h 4: a. _12_._ E . =?_s.^P017.- 2 .`. -654 _.._ C = 9.:..3 7 4::4 33.3: 214AC 404- _ 7-__ _- -_ -4;7-: - - E. -.219➢ MI. C 7.34.4 7u.. :_.7 24AC P2,- 3- - - :- - :- -.$35 MI ■ ,3:-3 7 7243 =PAC PCP.' --6,-_-:-.,,,..=2 __ -- 725 MI 3 24-,x.24422 __ - - ...-_�.: --_- x17 =4A^,PC+R3 4,,f-!,....4.11-,.744 ..- Ea _ 212 _ : 7.3: =RAL FOR- .6,4444,7_,:;a:. - _ _a -: �- __ - MI ■:^. _3 _.: - 3z1 GRA:..POW" - 2 E_ f'! 2332_ : II *4 p.,1 _ 2 -.3 77337 :_13 '442^.PDR- -_ _ t.za, _ .2 :a._. :2: Tubing Strings AC.=.1221 I , 12.232.533!:21511:7 11214.1 443...C:741 74:ttKEl sat:3F$!rt.123 CVFtS:TVG;7...'.721.15 'Silas 111:541119:i45 .3",1 2 322 4 _ 74:7 -- 2 . . _JE-'4 ,a:ca aw721.,a2r:, it Completion Details .3 Y i -- -'7 *04145113 F 1-4.4 T 732''12$ T !Int 3.4 2-.4 3322 1312_3'96 _.- 4:4' _7,.-s Sdat4 275-`32'.43.:." 2 ELL 1 : 2 _12 2,33:vsEJE 2._-2 _22.: 52'.. 4'3§4IP4LE P4_s_. - 1_'DS'.2.375-.E6FE 2-su.5 2.,.._ -2433 4 772753 77 55 33123E _ ___ '33'1,ast Sri'- c 2.322 44224.04 a,:asNi " -,549: 734: 72.as 32152:£3 53. _-3 3'..-5659x2 2.SGL P'77.3'24 733'' NIP. _ . _2_, _ .. .___ 2 24:- 3Ritl ` . 1vf .__ :2_333._7332:,_ 2323_ 1Perforations&Slots 2:5 F„ E:1'.1.25:441 22422.2,sc,oicag--...--I T_.;ttKE: 477 1121!: '!K.: '.N!', z..-..^. Sat, 1. Ty:. :17 '3 25 a 3.254.: 74-5.- 7.4'5 22_2-_ _. -?*C--:7 '4.9271 '452i.7" 7.4:3:7 7.4_;77 2236: PEP.'- ...--2:1 4.321- '52asasm,z ! 2223.- 5.27 2 739.3_ 7.333.5 22:.2.2_ PERF- _ -_.7 -5.95'_3 '5.964.: 740:'4 74=]1 22 -_ 4E40= 7RAC-147 _4=°s1Nislssm=1 '7.754.4 .7.'57.' 7.32. C.,3 : 22:2. 321 0c =._4.7. _V-3 :.7:3£7.5 7 99...7 1333.7 733_7 32_._.. 2E24-.4 .4•2_,,o.4.:p4- '8.42£.9 3.-_ _ 7.313._ 7223.: 22:.2.: -o -- _._'.3: 79.575.3 ,9,577- 7.3443 325 -- 21476.6 2:.475.4 ..353 7.3__ _2_2._ _. -...3=CRT 242®.-sr-44-.3:--7::i . 3.3 2..S'S 0 7,3547 755 i 22:.2__ 5 _4 .733.: .+.7 2.:.:. 23.36..: 7.323.-2 7.223. 32_.2.5 E-3' 255562721:c 4 e15 t3�"21'Q'1-_1 Mandrel Inserts - ---- it i now,711,4},2$411-a 7 N *17 1.22 P:rt 1129 1R.,:`,- 4R- 7 nos lb2211 CC;IrI 99ra Typo Typo ;in; Kvr^4[3 _- S i 375E i,... I 44414.4=41**44.41.14-.-� - il .xnc4 kolas:General&Sedity: lfR1►:212,1312]2ta l 21w:21,;321>4,4 2-- _2121*,241421212 4-'21 • Section 1 - Affidavit 10 AAC 25.283 (a)(1) Exhibit 1 is an affidavit stating that the owners, landowners, surface owners and operators within one-half mile radius of the current or proposed wellbore trajectory have been provided • notice of operations in compliance with 20 AAC 25.283(a)(1). TO TH•ASKA OIL AND GAS CONSERVATION CONSION Before the Commissioners of the ) Alaska Oil and Gas Conservation ) Commission in the Matter of the ) AFFIDAVIT OF Garrett B. Haag Request of ConocoPhillips Alaska, Inc. for ) Hydraulic fracturing for the CD5-09 Well ) under the Provisions ) of 20AAC 25.280 ) STATE OF ALASKA ) ) §§ THIRD JUDICIAL DISTRICT ) Garrett B. Haag, being first duly sworn, upon oath, deposes and states as follows: 1. My name is Garrett B. Haag. I am over 19 years old and have personal knowledge of the matters set forth herein. 2. I am Staff Landman for the well operator, ConocoPhillips Alaska, Inc. ("CPAI") 3. Pursuant to 20 AAC 25.283(1) CPAI prepared the attached Notice of Operations ("Notice"). 4. On February 2, 2016, CPAI sent a copy of the Notice by certified mail to the last known address of all . other owners, landowners, surface owners, and operators of record within a one-half mile radius of the current proposed well trajectory. Subscribed and sworn to this 2nd day of February, 2016. Garrett B. Haag/ STATE OF ALASKA ) ) §§ THIRD JUDICIAL DISTRICT ) This instrument was acknowledged before me this 2nd day of February, 2016, by Garrett B. Haag. Notary Public, State of Alaska My Commission Expires: STATE OF ALASKA NOTARY PUBLIC REBECCA SWENSEN 4%7, , IMy Commission Expires Aug.27,2016 • • P.O.BOX 100360 ConocoPh i I I i ps ANCHORAGE,ALASKA 99510-0360 Alaska, Inc. Garrett B.Haag,Staff Landman Land Department,ATO 1480 Phone (907)265-6297 Fax (907)263-4966 Garrett.B.Haaggcop.com February 2, 2016 VIA CERTIFIED MAIL To: Operator and Owners(shown on Exhibit 2) • Re: Notice of Operations pursuant to 20 AAC 25.283 (1)for CD5-09 Well ASRC-AA092347,ASRC NPRA-02,ASRC NPRA-03,ASRC NPRA-01,ASRC NPRA-04 Colville River Unit,Alaska CPAI Contract No. 203488 Dear Operator and Owners: ConocoPhillips Alaska, Inc. ("CPAI") as Operator and on behalf of the Colville River Unit ("CRU") working interest owners, hereby notifies you that it intends to submit an Application for Sundry Approvals for stimulation by hydraulic fracturing pursuant to the provisions of 20 AAC 25.280 ("Application")for the CD5-09 Well(the "Well"). The Application will be filed with the Alaska Oil and Gas Conservation Commission("AOGCC")on or about February 2, 2016. This Notice is being provided pursuant to subsection of 20 AAC 25.283. The Well has been drilled as a directional horizontal well on leases, ASRC NPRA-04, ASRC NPRA-02, and ASRC NPRA-01 as depicted on Exhibit 1 and has locations as follows: Location FNL FEL Township Range Section Meridian Surface 339.53' 2,592.97' 11N 4E 18 Umiat Heel 892.54' 3,284.31' 11N 4E 6 Umiat Bottomhole 2,373.69' 3,193.88' 12N 3E 25 Umiat Exhibit 1 shows the location of the Well and the lands that are within a one-half mile radius of the current proposed trajectory of the Well, including the reservoir section("Notification Area"). Exhibit 2 is a list of the names and addresses of all owners, landowners and operators of record of all properties within the Notification Area. Upon your request, CPAI will provide a complete copy of the Application. If you require any additional information,please contact the undersigned. Sincerely, 411 13 Garrett B. Haag Staff Landman Attachments: Exhibits 1 &2 • • Exhibit 1 ConocoPhillips j Alaska,Inc. ADL388466 CD5-09 Leases Map 01Feb1E 26 ( 25 �- \C_NpRi i f �O� i 32f O2 i i i i E ASRC-NPR2 1 l Alpine PA L.._.., i I AoRC-NPR4 ASRC-NPR3 6 II •1 1 t 1 i AA092347 T1 N R4 E _"_ i T1NR3E �.._.._.� CDF i i I, AA087888 AA092347 ASRC-NPR4 ADL387208 li 0 Frac Point 1 32,00C Open Section Reference: Well Trajectory E Well Data:ConocoPhillips Technical Database(ATDB) N ❑1!2 Mi.Radius _ n Alpine PA 0 0 25 0.5 0.75 1 N ASRC-AAO_ El CPAI Lease Miles • • Exhibit 2 List of the names and addresses of all owners, landowners and operators of all properties within the . Notification Area. Operator& Owner: ConocoPhillips Alaska,Inc. 700 G Street, Suite ATO 1226 (Zip 99501) P.O. Box 100360 Anchorage, AK 99510-0360 Attention: Erik Keskula,NS Development Manager Owner(Non-Operator): Anadarko E&P Onshore LLC 1099 18th Street, Suite 1800 Denver, CO 80202 Attention: Mike Nixson, Director Land-Alaska Landowners: Arctic Slope Regional Corporation 3900 C Street, Suite 801 Anchorage,Alaska 99503-5963 Attention: Teresa Imm,Resource Development Manager Surface Owner: Kuukpik Corporation P.O. Box 89187 Nuiqsut,AK 99789 Attention: Mr. Isaac Nukapigak, President 23 10Feb16 717 "''''' 1 — — — — ConocoPhillips ASRC-NPR1 Alaska, Inc. t CD5-09 N A �6 0 0.2 0.4 0.6 0.8 i' , Miles 25 i29 i T ii. R3E j 1 36 cd iko i 1 ASRC-N PR2 CD5-03 1 AS 1 5 1 4 j Alpine PA J CD5-04 1, _ _ 12 92347 11 N R3 E 8 7 9 AilN 1411* 1 1 CD5-05 I CD5-11 ti_.._..� 1 • Frac Point 13 f j —Well Trajectory 92347 ASR -NPR4 17 j Ic —Well Within Frac Radius j QDL387208 ❑1/2 Mi. Frac Radius CD5-313 1 —Well Within 1/2 Mi. Radius CD5-315 rte" —"—"." 1 ❑ 1/2 Mi.Trajectory Radius ' � CD5-315PB1 j I Nanuq 0 Alpine PA !Kupar-ukPA E CPAI Lease 19 j 20 j 2`' ,,,- • e , ,,.. -V. r / /Section 2 — Plat 20 AAC 25.283 (a)(2) }} Plat 1: Wells within .5 mile ,......Su.- ConocoPhillips Alaska.Inc. rlitaltame CO5-09 I Leases Map 18Jan16 NPR1 yi l I,I MI I i 33f _ _4.. , 3 . 1 i i , _ ... , is-Martz — _ ! Alpine PA J t • i f�f -.-NPR4 ii ASRC-NPR3 1 t 1 1 1 -- I 1 1 F AA.09237T1 RN 4E ,A 1 T'1NR3E 1 . 1 ____ it 1 :Ao8-888 1AA092347 \\............,-.1; ASRe$-NPR4 I ADL387208 • Frac Point 1 zn� —Open Section R:rer:nc: —Well Trajectory well Oet3:CanocePhiH(ps Alss¢s T d I Cat3Gsse,ATCe. N 01/2 Mi Radius _ _ C3Alpine PAAsRC0 0.25 0.5 0.75 1 0 CPAI Lease j Hiles 0 S From: Riemenschneider, Jacob W Sent: Wednesday, February 10, 2016 4:27 PM To: Blakney, Robert G Cc: Sylte, Hanna Subject: RE: [EXTERNAL]CRU CD5-09 (PTD #215-177, Sundry Application #316-096) - Application to Hydraulically Fracture I added CD5-07 to all 3 maps and included CD5-10 in the other 2 maps. Updated Table Data: CD5-09 Well API WELL NAME STATUS Type 501032071800 CD5-03 ACTIVE PROD 501032071100 CD5-04 ACTIVE PROD 501032071200 CD5-05 ACTIVE PROD Being CD5-07 Drilled N/A 501032072400 CD5-10 ACTIVE PROD 501032072600 CD5-11 ACTIVE PROD 501032071400 CD5-313 ACTIVE PROD 501032071470 CD5-313PB1 PA N/A 501032070700 CD5-314 SUSP N/A 501032071600 CD5-315 ACTIVE INJ 501032071670 CD5-315PB1 PA N/A • • Table 1 : Wells within .5 miles Well Name API Drill Site Status Well Type CD5-03 501032071800 CD5 ACTIVE PROD CD5-04 501032071100 CD5 ACTIVE PROD CD5-05 501032071200 CD5 ACTIVE PROD CD5-313 501032071400 CD5 ACTIVE PROD CD5-313PB1 501032071470 CD5 PA N/A CD5-314 501032070700 CD5 SUSP N/A CD5-315 501032071600 CD5 ACTIVE INJ CD5-315PB1 501032071670 "CD5 PA N/A • S SECTION 3 — FRESHWATER AQUIFERS 20 AAC 25.283(a)(3) There are no freshwater aquifers or underground sources of drinking water within a one-half mile radius of the current or proposed wellbore trajectory. See Conclusion number 3 of the Area Injection Order AIO 018.000- Colville River Field, Alpine Oil Pool: Enhanced Recovery Project, which states "No underground sources of drinking water ("USDWs") exist beneath the permafrost in the Colville River Unit area." • • SECTION 4 — PLAN FOR BASELINE WATER SAMPLING FOR WATER WELLS 20 AAC 25.283(a)(4) There are no water wells located within one-half mile of the current or proposed wellbore trajectory and fracturing interval. A water well sampling plan is not applicable. • • SECTION 5 — DETAILED CEMENTING AND CASING INFORMATION 20 AAC 25.283(a)(5) All casing is cemented in accordance with 20 AAC 25.52(b) and tested in accordance with 20 AAC 25.030 (g) when completed. See Wellbore schematic for casing details. • • SECTION 7 — PRESSURE TEST INFORMATION AND PLANS TO PRESSURE-TEST CASINGS AND TUBINGS INSTALLED IN THE WELL 20 AAC 25.283(a)(7) On 11/25/2015 the 10-3/4" casing was pressure tested to 3,500 psi for 30 mins. On 12/10/2015 the 7-5/8" casing was pressure tested to 3,500 psi for 30 mins. The 3.5" tubing will be pressure tested to 00 psi prior to frac'ing. The 7-5/8" casing will be pressure tested to ) psi prior to frac'ing. C >t/ 3Y O psi Gish) 2/8/2 0/ • 0 SECTION 8 — PRESSURE RATINGS AND SCHEMATICS FOR THE WELLBORE, WELLHEAD, BOPE AND TREATING HEAD 20 AAC 25.283(a)(8) Size Weight (lbs) Grade API Burst API Collapse 10 & 3/4" 45.5 L-80 2,090 psi 3,580 psi 7 & 5/8" 29.7 L-80 6,890 psi 4,790 psi 7 & 5/7" 39 TN110 10,900 psi 10,000 psi 3.5" 9.3 L-80 10,160 psi 10,540 psi Table 2: Wellbore pressure ratings • • Stimulation Surface Rig-Up Bleed/Tad. \Tale Tare(Tad( 11 1 11:111 1 10 2 Vy • r • Minimum pressure rating on all surface X121 1:Z11;191 treating lines 10,000 psi • Main treating line PRV is set to 95%of max treating pressure • IA parallel PRV set to 3500 psi =Jai • Frac pump trip pressure setting are staggered and set below main treating line PRV • Tree saver used on all fracs rated for 15,000 € psi. �� 1)31 ick�ro ()a s, I 2 kl du+md Pap-Off Tarit 54 Pop-Off Tank 1 1 Pump Truck ot -01 SGS y(q 00 ,4) Q o 8 Frac RAM ..f }— -D81-f 4- Frac Pump ROC PUMP -{ A-- — - - - Frac Pump f Frac Pump Frac Pump • s Stimulation Tree Saver OPEN POSITION CLOSED POSITION (PRIOR TO MANDREL INSERTION) (W#NOREL INSERTED) /FkAC IRAN / CONNECT70N j 11 r ► i i 1 ► ► 4•5.>TT.,_ 2IEMM"PtvE TEDTT MASTER VALVE . P ( MANUAL OPERATED �l Y MASTERVALVE �rwr smomms KA 6 ( Stinger I ipi 1 MANDREL .._. 1 141 I -)4\ , ,2 VENT „;0 I.01---VALVE c. OPEN *jt‘ /►I 111 11 rki _� ilan � ( z`IF;01 i / ` � FLOW TEE AND r 1 ,i KE` VENT VALVE WELLHEAD ' ' Nlini VALVES Y, %/f/ OPEN r `,� tL I ii.„-ii. te, � I 4 `r WELLHEAD ,,... VALVES ` wt CLOSED �..s �L_ ✓".i` *4t: • S l " - 1110"I ."'00%.1:1; IlL -:11:4 * k �ili� ll"til►■1 00, -��_ iN4KT w4.1 R.rY7gTOR II �� s. -........•• W i! v F:: 4.42: ,JI 13 I =-=--- H « r go.7•,,�F NF i. 1 � �.''. •.LDrMT�.�w - — ela— mitsurrdw% .....%051—\\ J. i frin ...tom. Am.= �r1 �r mit:: ---".! -- - '''Iii°;.71:1rIii:,..., .ir, II atm Iii -� ie- I ' ar. r 1.1......2-1- - Ell 11 '",11; _ 1:1 . 11.- �� . 1 ..�.evL - .eamw.a.. - 1' .a1.14 te �e •y-� .. ��I. ` m� 'p..cpsi.e4 IMM�I _: _ 'I1'`;AW I:'__. . ,�•_Mr Imo..., -- I' It �— III II = .. s.� .R«r 4K T4� uR :4r its I —."4—.•S.M.Y l�� 11111111t *WarIM .mi...ram. . � , V MIN= Nam 01 Ill RZOLL:"--.‘:: — aPw* .�IST..-'4' �O}e ICJev CaVYP� '�� ... -- time, Wen ik,Dip I r�bxi{;:Nllew sT51d//a:TLCT sum 11 TAL ills 7. 1...�r u nTnsseyl.eua �v n.,..,a... �� • C ........ .a ..— 411, S SECTION 6 — ASSESSMENT OF EACH CASING AND CEMENTING OPERATION TO BE PERFORMED TO CONSTRUCT OR REPAIR THE WELL 20 AAC 25.283(a)(6) Casing & Cement Assessments: The 10 & 3/" casing cement report on 11/23/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement, displaced with 10 ppg DrillPlex spud mud. Full returns were seen throughout the job. The plug bumped at 500 psi, and the floats were checked and they held. The 7-5/8" casing cement report on 12/5/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement, displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug did not bump, pressure was held on the casing. The floats were checked and they held. Summary All casing is cemented in accordance with 20 AAC 25.030 and each hydrocarbon zone penetrated by the well is isolated. Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. S SECTION 9 — DATA FOR FRACTURING ZONE AND CONFINING ZONES 20 AAC 25.283(a)(9) CPAI has formed the opinion, based on seismic, well, and other subsurface information currently available that: The Alpine A interval is approximately 30' TVD thick at the heel of the lateral and generally maintaining the same thickness to the toe. The Alpine A sandstone is very fine grained and quartz rich, with a coarsening upward log profile. Top Alpine A is estimated to be at 13,252' MD/7,346 TVDSS. The estimated fracture gradient for the Alpine A sandtone is 12.5 ppg. The overlying confining zone consists of approximately 380' TVD of Miluveach, Kalubik and HRZ mudstones. The estimated fracture gradient for the Miluveach is 15 ppg and for the Kalubik and the HRZ is 16 ppg. Top HRZ was encountered at 11,844 MD/6,927' TVDSS. The underlying confining zone is the Kingak shale which is —1,800' thick and was not penetrated by CD5-09. The estimated fracture gradient for the kingak shale is 15-18ppg. The top of the Kingak interval ranges from —7470' -7525' TVDSS (no MD as for this well as it was not penetrated. • i 2 <s 0.8 q8 za g§ .,8v w 8 3 $ TYE oc 6o g. 3 c ra a t " y m .:.9. E 10 oc Om pE o N 2 a2 6 a ;int enann ° z e w ; ri � z z N Q z „ o oII — '74 yF.Az c c 8 mh a ; a - a a. N a N N a mN ill n .. -- C M n m n a n 'V Lo 11 0 t7 t7 l9 E U' E V h m 7.-'., v a' 0 e0 A �S 6 R x x ¢ d V Q .0 O E 00 ci a m 6 z m E m E 41 E ^ tl N - `o s ,:i Ai o a e m@gl 02 Fl X d cO 06 co co co co cO 7 a 3 a mm - - — m N No 2 e n a Y O m M1 O A Q 0�0-a0 ti a 2.N Oi n I- �@I - u Cu uc -i; 0 o0 a, 0- u H 8 v L ,, w oad 0 aw v ' ' t ,, u r 9 u u 9 m 0 0 E g co o 4 I I E. q B 8 n n a 8t. a n / $ W u o .2 p w . a 1.5 a a> & y 8 y i a) _ _ 5 _y pp it; p -56' v q v t L t L .."2 s t L E' E „°, 04— c c c _ 0 0 0 0 0 5 0 0 0 as a) . L Q t > o sIE $ a v m a d g c m ¢ j m 5 Y z u _ C6 g b 3 3 8 8 8 3 9 r G E V)i-+ `fi V_N1 �tpp N W to -nc in O m - to b N t`I M .ni N L O 00 I� h "�43_- n b N P.O n g� Z U (La d LL S 8 m m m a'f.- - o o to m P•1 M 2 g `o-� ,.. .. o Y.o n ni .. r ni ,.,, cri g 6 I-, z H- I-a 0 c a - io - - e t ¢ °° ¢ ¢ a O " 0 z z z 6 0. .-, - .r m m - ., 0 I m 40 00 to EO 00 \ m W 1-z- ' c0 r n n r n o n n N 4 5 Q 4 4 6 i n < 6 s s s s" "s $ s ePI 0 u S • CD5-09 Nearby Wells Cement Evaluations SECTION 10 — LOCATION, ORIENTATION AND A REPORT ON MECHANICAL CONDITION OF EACH WELL THAT MAY TRANSECT CONFINING ZONE 20 AAC 25.283(a)(10) The plat shows the location and orientation of each well that transects the confining zone. ConocoPhillips has formed the opinion, based on following assessments for each well and seismic, well, and other subsurface information currently available that none of these wells will interfere with containment of the hydraulic fracturing fluid within the one-half mile radius of the proposed wellbore trajectory. Casing & Cement assessments for all wells that transect the confining zone: CD5-03: The 7 & 5/8" casing cement report on 11/1/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8ppg class G cement, displaced with 11.1 ppg LSND. No returns were seen. The plug bumped at 320 psi, and the floats were checked and they held. CD5-04: 7-5/8" casing cement pump report on 6/10/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Class G cement, and displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug bumped @ 900 psi and the floats were checked and they held. CD5-05: The 7-5/8" casing cement pump report on 8/27/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Qannik Slurry cement, displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug bumped @ 1700 psi and the floats did not hold. Pressure was held on the cement. CD5-07: As of 2/11/2016, the intermediate hole of CD5-07 is currently being drilled and has not been cemented yet. CD5-10: The 7 & 5/8" casing cement report on 1/25/2016 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8ppg class G cement, displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug bumped at 750 psi, and the floats were checked and they held. CD5-11: The 7 & 5/8" casing cement report on 1/4/2016 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8ppg class G cement, displaced with 10.9 ppg mud. No returns were seen. The plug did not bump, and the floats were checked and they held. CD5-314: CD5-314 was plugged and abandoned per state regulations on 5/10/2015. CD5-315: The 7-5/8" casing cement pump report on 10/3/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement and displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug did not bump and the floats held, and pressure was held on the cement. • S CD5-315PB1: CD5-315PB1 was plugged and abandoned per state regulations on 9/24/2015. CD5-313PB1: CD5-313PB1 was plugged and abandoned per state regulations on 7/14/2015. CD5-313: The 7-5/8" casing cement pump report on 7/25/2015. Full returns were not seen throughout the job. The cement job was pumped with 15.8 ppg Class G cement, displaced with 11.1 ppg LSND. The plug bumped at 1,140 psi and the floats held. Summary All casing is cemented in accordance with 20 AAC 25.030 and each hydrocarbon zone penetrated by the well is isolated. Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. • i SECTION 11 — LOCATION OF, ORIENTATION OF AND GEOLOGICAL DATA FOR FAULTS AND FRACTURES THAT MAY TRANSECT THE CONFINING ZONES 20 AAC 25.283(a)(11) CPAI has formed the opinion, based on seismic, well, and other subsurface information currently available that two faults or fracture systems transect the Alpine A formation and may enter the confining zone within one half mile radius of the wellbore trajectory for CD5-09. These faults were interpreted from log data while drilling the lateral. They are not mapped with seismic and are interpreted to have throws less than 5 feet. CPAI has formed the opinion, based on seismic, well and other subsurface information currently available that the apparent fault will not interfere with containment. Based on our knowledge of the principle stress direction in the Alpine A formation, along with the well path, all of the fractures will be longitudinal, running parallel to the wellbore. Because of this the fractures will only intersect faults that intersect the wellbore. We do not expect any of our hydraulic fractures to intersect faults seen in this wellbore. If there are indications that a fracture has intersected a fault during fracturing operations, . ConocoPhillips will go to flush and terminate the stage immediately. Nearest Vertical Estimated Distance Well Depth Depth Displacement Loss Frac Propped from Name MD (ft) TVDSS (ft) (ft) (bbls/hr) Port XF (ft) fault(ft) CD5-09 16,273' 7,339' <5 0 • 15,961' 135' 177' CD5-09 16,473' 7,343' <5 0 • 15,961' 135' 377' Table 3 —Drilled faults • • Plat 2: CD5-09 Fault Analysis wM -- ConocoPhillips Alaska.Inc: __ CD5-09 r `� Fault Analysis __ i ADL3a8488 18Jan16 : \ t m i T u. R3E ,, 1 '• ` 2Ni \ i i i i' .35 CI 1 I i 1 —)\ P _ ASRC-NP R2 i 1 ASRC-NPR3 j Alpine PA i 1 y i ` i AA092347 Til N R 3 E i ._..- Tr1NR4E i t _____ 115_ 1 1 F.-- i %...........; AA087888 r-_, 1 AaA092347 ASRC I-NPR4 1 APL-38f;QI • Frac Point Reference 'Z'''" — Well Trajectory Well Data:ConacePhillips Ales.a Technical Database IATD8 1'2 Mi.Frac Point Radius N 0 1/2 Mi Trajectory Radius _R _ ___ �,,,.;Alpine PA — 0 0.25 0.5 D.75 1 ASRc-AAo92344 El CPAI Lease IMiles • SECTION 12 - PROPOSED HYDRAULIC FRACTURING PROGRAM 20 AAC 25.283(a)(12) CD5-09 was completed in 2015 as a horizontal producer in the Alpine A formation. The well was completed with 3.5" tubing and a 4.5" liner with ball actuated sliding sleeves. After the 1st stage we will shift a sleeve to close off that section of the lateral. We will then pump the 2nd stage and drop a ball (progressively getting larger) after each remaining stage, these balls will provide isolation from the previous stage and allow us to move from the toe of the well towards the heel. Proposed Procedure: Halliburton Pumping Services: (Alpine A Frac) 1. Conduct Safety Meeting and Identify Hazards. Inspect Wellhead and Pad Condition to identify any pre existing conditions. 2. Ensure all Pre-frac Well work has been completed and confirm the tubing and annulus are filled with a freeze protect fluid to 2,000' TVD. 3. Ensure the 10-403 Sundry has been reviewed and approved by the AOGCC. 4. MIRU 16 clean insulated Frac tanks, with a berm surrounding the tanks that can hold a single tank volume plus 10%. Load tanks with 100° F seawater (approx. 10,000 are required for the treatment with breakdown, maximum pad, and 450 bbls usable volume per tank). 5. MIRU Stinger Tree Saver Equipment and HES Frac Equipment. 6. PT Surface lines to 9,000 psi using a Pressure test fluid. 7. Test IA Pop off system to ensure lines are clear and all components are functioning properly. 8. Pump the 310 bbl breakdown stages (25# Hybor G) according to the attached excel HES pump schedule. Bring pumps up to maximum rate of 20 BPM as quick as possible, pressure permitting. Slowly increase annulus pressure from 2,500 psi to 3,500 psi as the tubing pressures up. Ensure sufficient volume is pumped to load The well with Frac fluid, prior to shut down. 9. Perform a hard shut down, Obtain ISIP and fluid efficiency estimates. 10. Pump the Frac job by following schedule @ 20bpm with a maximum expected treating pressure of 7,000 psi • 10 stages — 850,000 lbs 16/20 Carbolite Note due to time constraints the hydraulic fracturing treatment will get split into 2 days of pumping. 11. RDMO HES Equipment. Freeze Protect the tubing and wellhead if not able to complete following the flush. 12. Well is ready for Post Frac well prep for flowback (Slickline and possibly CTU). ,-I t : NN ! ss gsN$ ri ,i,1 NrlSS2 � 22ry8NN$ ry ,i ry22n 25sssgNNNNN2 : : : : : :G ClOE O G G G G Oi 0 0 0 0 0 0 0 0 E 0 0 0 G G E G O 0 0 0 E 0 0 0 0'G O O O E. GGEi000 828 880 2 8888888 8580 8 2 2 8 8 882 8. 8 88p 2 $ 2 2 2 8 8 2 2 2 2 8. 8 88888 [ e--v N N n ry n ry ry ry ry ry N N ry N ry ry ry ry ry n N ry n ry ry ry ry ry ry ry N ry N ry ry N N N N n ry ry ry ry N N ry ry ry ry ry ry ry ry ry ry ry ry N G 8 s, 8S 51 40 8 ., .74 7. m 1 i G O O O O O O O C 2 O O O O O O O O o 0 O O pp pO O O G 0 0 0 0 0 0 0 0 O V o 0 0 0 O p p O O O O 0 0 0 '0', 2, '.', 21', p TO o00T p m000 0T00 00 0000 0 000 O OOjQ ,, aO Om . e U ^ pO po pp O O O < 2 e0 0e -+ g m a. � V 'e. 4 .i .i .i N N N N e, 4 N ., ., 4 ., ., ., .r .i ., rO 4 e, e, 4 4 e, .-� ., ., 4 ., N ., 4 .I 4 ., ., 4 , e-r e, r N 0.� .I O � V0 88 888 .4 -48 .488 ' ' ' ' ' ' ' ' ' ' ' ' 88 ' ' ' ' ' ' ' ' ' 8 " " ° ° 8888 ° ' 8088888 :: �� O O N N O O N O N O N 0 0 0 0 O O O O 0 0 0 0 0 0 0 0 0 0 0 0 y O N N N N N 0 0 0 0 0 0 0 0 555555 N O N O O m'a O O O O O O O C 5 5 0 0 0 0 o O G 5 0 0 0 0 0 0 O G )) O O O G O O O O 0 0 0 E ., 2 a a ."i .N. 8 m 2 a, 4 .n. 8 m N m 2 .rv. 8 m w v `° o n o 2e 4 m '' o e a s .4 E .m, 0 8 c$ n.m 8 g m " ^ o o g °m1 . o $ c v m o 0 0 0 0 0 0 0 0 o c o 0 0 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E E e 88m o moo .`+ Q $ o mvo .� MQyo my 208m .m,, t+18o v .n,, om nvrv,, o .',°° 8888 E WEE88 8 o 7-12228828 ',12 8V, 2228828 :12228828 ;12222888 -1222 0 0 '8 o g .rv, o 222 `' eo ry m N o a z c 8 0 0 0 o c "" "" �" "� �" 0 0 0 0 0 0 0 0 0 0 " 0 0 0 0 0 o o c o "" "� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c o c o c o 0 o c o c 0 0 a N $ 0 0 0 ,o a ca 8 e m !. o a 2 �- m m ry ., ,� m m n ., 8 m m ry m ,o N ., ti mL',.,, ., ' 78 ^� N N ry m c na - c c c v = a e • '4 m g om N N mNN m mg N n 2 ? 2 8 4 2. ^ 2 ti m g Nnm � Nm ., � ,, a o a om m .-.,. . § § 0 § F;' e e e 2 e e a ` o 3 4 8 e e E, o C'4, g m o 2- -a , ,y ., , ., cM N 1 m ., m m �. m ., m m vo1m 'N° m m �, mN 8 n m ,c a v O ,, m• m e a .o ., m m 6: F2 4N 888 4444 N N 4 N N ry 4 N N N N 4 ry 4 N N N N 4 N N N N N ry 44 N N ry 4 N N N N 444 N N ry 422 NNNNNN o � BNSmSSe Sv1 � ri m a888 .: N e : NS m e ,n ,n 5, 88m 86 8vi ,8 .; ,MT, ;; ; 8N88.ri a o 0 0 0 o N o o O "'":"Z' 0 o N N O o 0 0 o N o 0 o ry 8 0 0 o N . - - nb n aa - 3332 2' .° oa 2o o o 0 0 0 8 8 8 8 8 8 8888 33 333333 333333 3 88888 88 .f.°, 88 ,:.° u u u 3 LL m a - a3 , - o ,� - 33339 23 .73 o � ] 1133a o a3a o 3 3 a33 s o3333 Ln A c 5, o um mA m Ao m � � 2a � A m A m 2 c m a c° oy ,� m A � m -,% v oa O L 1 % - -0 i u nd o2Z22- 2,9. n 2 a a a oaaao. a u oa n u oa n a aaaa 0ua n . N N N U U 0 V' 0 - 0 V' U' 0 V' U' V' l0 V' V' U' to l0 l0 U' u.U' U' U' l0 U' V' U' . V' l0 l0 0 U' t0 0 . l9 0 U' U' ', l0 t0 . 0 U' l0 V' 00 l0 t9 ,.,, '. ?. ?_ ,,-,. ,2 l0 U' U' U' V' C = 0 LLu . xx . x x x x x x x x x x Nx u " x x x x x x x x x x x x x x x tt x., x x x x x x # x x x x x a x x x x x CU l' a ^ LL ry n 80 N nnryryNryNNN NryryNnn ,nN NNryN N N ry NNaan NNryn rN nryY Wo L. CO Q m .. .. 01 0 ., : '' N N ry n N N N m m m m m m m m b e e e a e d ,, u1 ,n 1, ' 1 v1 ,o ,o ,Yo ,c ,S N n n , n Q � L A.SU 11L181Z-PIM i' A,S91 & i S9t 90 A. d E 2 Pun S9l 116LP0Z-LLOOZ@7 118L961•SL9610 891 11 ZE8Hl-6Z991.@0 1.66L1-BB6Lt@ S91 11L9 11 t-981Lt C7 591 1109651- 0 PunV Pun V PueS V PueS V PueS V Pun V t 1.1011.11l E Z lenlalul C lenlalul 9 lenlalul S lenlalul 9 lenlalul L lenlalul C 0 U • N aDDOD � _ � g -, 8 8888888888 `° sc,10n°'.ra- ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry ry m " n - o / o Owo6008 .S. 8 " 6000 o 0o m - w ; :: ;1111 moddoDDoo00odod0 do"..„.,, ,.,.,,,,, 88888S888884„ " "•" ” . ry ry ry ry ry ry ry ry ry ry ry ory4 ry ry ry 4 oryry ry ry ry ry ry ry ry ry ry � ac r T c t 0. 8 ry E o o a 5 0 5 ' m . ao 8 a LL _, '; L44' 242428 e a o 0 o4L4442- 4442 0 v a vv e a m ;!. 1.1 .-! ao` o 0000006 aoo00 00006606 u d1,00 u = = nc y m m m 8 8 8 8 8 8 a.- ao0 0 0 0 0 0 0 0 o c c c c dei 0 0 0 0 0 0 0 0 0 m um o o =' auum u 8 V, -..m 8 0 m E v 8 8 8 e 0 8 0 8 8 8 8 8 8 88888888888 ti v q•i D g n 5 0 D 6 0 0 0 o D D D n N ry N o o ry D D \ 21,,,, rmn D o "' "' n ry ry n ry ry ry o o ry 0 0 0 o ry ry ry ry ry m m a 0 0 0 0 0 0 0 0 0 O o C G G O O D 0 0 0 0 0 0 O O m a W m ` O m m o a a m ,n g 00 . , m asCY re OF.: 1 -ge288Ag ,'=. 28824222L4 ' - '.c 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ' -% c- o` u `-- N g E 6 0 8 .+ 6 0 0 0 0 .: o 0 0 0 0 g Z . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 0 0 D o n o i a;73 °- a ry mO ry ry ^, « � S m rv ,., C 10 m v C N a_ - m m m FA . 8 8ti o m 8 e S U ' ,1144444444444N N ry ry ry ry N 4 4 ry 4444444444 - \ rc , , , . c 7 ;'g88 rvma � 8888888 885. 8 58 f-. 6 7i o 11 ;111'n';1 000 oryo00 0 0 2N u u u u u u v u u u u u' u u ,11 u A u u u u u a a 3 3 m o a 3 - m m m miiii -g la @ 2 a L!1 8 a c 6 0 O N o a er, raaaLaa.zi aaaaaa i.6 a s a f III ,n,4' a a a a a N a a a d a a N 2' 8_922-M2- 2 0 c U U ,_ 0 0 U 0 0 0 0 4 0 0 U 0 0 U U 0 8l` l9 CJ` l` UVUl7 ` ^ YC Q a x1 _ xanxas aaaaaaaa1124:;1 ' ' ' ' (E ry a r ry ry ,� N n ry ry ry ry ry ry ry ry . ry ry LL m v,O QWo . - - Q oE '' 22 w m d, an d mm . . „ . . . , oowm cc w Q— NZ a0 _ = i, A, h' ; '; m d E Z 19651 @7 S9 II Len -9ZZSl @ S9 110ES91-LZSb1 @7 S9 U4S9El-1S9E1) " LL U PueS V POESY P0OS V O - 91en:awl 6111,W11 011ence1111 C 0 U • S NC a.. o o C O EE N L0 Y c° 0 X it ai z O 2 _•~ N w a) a E W ON o N an a1 V) M D U a)i a a N (6_.O N. N a a Z ZZ 2Za2N- (D N N as 2 w C N 0 a m F2 cr co a) V (0 (D N W C l- " v- 0) 4) N V N- N 0) V (D COcoM (0 N N CO N Ln (l) (D x- (4) CO 0 V M 0 0 co CO N 0 N 00 N N CO N 1- N 1- N- D) C .-- T E f.. 0 ,. .14 °� ow ow o ao ow ow ow o ow 0 0 0 0 w 3 0 Y a O O m M Ln to T M 0, (, 0 co01 0 0 N 01 N (0 l0 N l0 N o O N O E a .a (4 "' 0 N to 0 [-) CO N CO 0 N M N (n M N N N 0 0 0 0 (n O K d C 7 0 0 0 0 M/6 0 0 0 0 o O O O 0 0 N 0 O o 0 0 N 0 ma) C) LLE � . . . 2 CO ,� 000 0 00 0 0 N) 000000 LL O I U dow ow ow da ow ow ow ow 0 ow 0 d 0. ow ow ow > 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 N 0 0 0 0 • C .- 0 N 0 0 N o o to 0 0 •0 0 0 •0 0• 0 N a 0 0 M 0 0 10 0 0 0 l0 0 0 13 Q ^ N N N • N a)C R C O E E ▪ >, _ E C o x m -- (C a) 2 C O 0 co U V 0 0 V . li _ N N 0 r r N N 0 00 C co 1 CD L a) U d J? (D I- N- a) � 0 CC0 (CD (C0 , M Qui IA 0 < E ccoo Ln o) a CON c `c 0 Oro — 00 p Z a a ¢ nNv o NN- N O (o v ' 0000 z Z Z w Lo co 0 (D N 0 (o ,- 0 (0 03 (D ) m s 0 O a E a p N •3 co O C COc -5 cri N C m m IP ca `as 2 R 0 O O E 3 N C a) E o 5 aL a)a o c o T (6 C N a) w v.c N Zf 0 C N O d (0 c x .N n 4.. d b m N F N E a) 3 U U N o 4-, c L'C T (0 O_� a E a) N .N U) .(2 N 1-.2 N b al > > 7 s U N E c c u E o N a) 'E 'c�' a) u) U aS_ _ co O N =O ' 20 ° EE° 3 `°� � E nTuOi92coO > Q. a Q < Nm (�) () E Ea) a) o a) 2ZZ' = 7 . a) E Z Z Z — N a a < <co ca in 0]0 o 0 0 0 W ( 2 A >.M(/)(A O) Ni C) a p O Y (6 N a = O Cl N) 0h _ U N N m G J m Lq O N nl O)a) C d y O C N J W 0 N i, n M C a CO > V Q O r)^ W V N y - ONa O= V N a= 0 ` aap U w U.o 3 a N o00 ,_� o 03 2 u., a mm cuU V O F c YEO. z . a m o a -o Oa N w a m o o a U 0 0 a= m am0aZ a a) 10 `" ca Eaa -°'a o n >o> 00 `) o m _ O N o E Z E .O Y u F F?) a D. `o >= 0 7 Z 820 _1 Rc30 -° ?G (� 7 a) = _o m U •`=' ✓ ` a a) c J a 0 d 3 a) co O 2 c) E ca LL Q `m m m a 0 O c L d ; O A > > 0 O u_ v E° c a LE m A E (oQJ WDLL a> 0 z 3 o a c6 C!)Lij 00 oF-0 (�>i C0 (D = y > U Z r, ZmO Z(,,0-W W Et- —m m O.WiOY Z I- ~ A V. ,DLLW, N Cf)D.WCQYaY¢WF o () LLI W o u 7:3 F NSm<' U0o,O� Wm' m' (o< Co I 1 0)Om Q22UUJM=d' mmM 0 • • ''j u) 0 CO • C CO.N O - a m .= � E U O Q a) a) C L O C N C N > O f2 E rn m U N E C g O N 0 N 0 MC N CO CO N N L(J CO IN 0 LU 4.o -(0' .N- , N Q) , .- a' L O ,- N LU a J CO C 0)L .. . (6 3 N^ O @=L do 0 ch. 0 LU ow da do odaa0 0 do do o 0(� o ,-1 N ri o r CO 0, 0 0 0 t0 M 0 LU CO 0 O O 0 rO '-1 O M O1 N LU rl O LU W U O l0 M Q) C') LON 0 N 0 L 0 N 0 0 0 0 CO 0 0 0 0 CN U7 O O O 0 0 0 0 0 0 0 0 0 0 0 ) C ._ O O O O O O O O O O O O O O O U a) m a) H) w C_ ,,y) oW d. d. do dU LU do d. do do do oW LU oW a E N 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 C O O 0 0 0 0 0 0 0 0 0 0 O O N Q Q _ O LU O Ifl 0 0 -, N ri O O O rl O .c '- LU M0 0 Q@ a) C m E In.I O o a C a) a) N a 0 c 'a 0 4(-0 7.n- -0 a ▪w 2 p U.0 C a) COa a Q 0 c U ° O• N [n O o co • c 0 L a Cco , M 4 o . O N O C N N O 2 F-' (6 CO N M 0) N V N M N- N y M > (6 Y- a W pl IA ai N M M N W a - - O N 0 O O V '4 M 0 v) f� '- N �1 a) £ 0 L5 3.3 a (j O) U N N .- .- .- p C-O N M r r- U r 3 >,C L a a) N aq a) a) E ' O a > CFQ N 4) aO N O . o mo_ 0 __ O- x J a) m w L" N (. O73 O Y 173 ,_ N Ewa. U a w0 U) O.N O (0cu ti L (6 L.-• N N O C 0 a) ' ON11_) aa - m Q nx a) Q c L E E COO > V 76 •X CO g co d ao .LN N -T )) O '- 0 0NX C 0 M O U CaN 7. .2 .c E OU 5 . E a 0 Ll- N • a) U U LTL OL) a ' L j -. N an(6TTLJJJ L 2 Q O,_0 w '7 'w0) EEEEEE a c -17..° t —7.,U Nn tao1 N) Q J J J J J J Q O N C n 3 XC C00 U "O a s 'O a -O C Q UC ) C7, 'Q JNOpE0COOOOOOOJ zOa0 _in n. aaii) Ci) (nCf) (nmU) U) 5 - °L aacm CO m a mo 73 a w o o cu L@ 0 2 L u_ x N C U w a) a 4. N a a)u)L N a) Q Q c a a 0-a. mu) a) a U E - O 2. C Q C E 7 N L N N (T6 a co 0 .- EEa aa) Cao CAU .L. a)C N C C N Q O• O E O ()ff., O Q E a)) O (6 Y m m E O K 7 2, a) O C C - LL O 0 C a N O > .- a N .L O) N N" N .. O - O O (0EL5 ON O C O a) To 8 L EO'2 p a H- a( ) NON m : Z Q 0-.-8 y • • TD Q o 0 2 c U . Q Eci < U- 0) 0 o1 � Lo A-•op U °A= • • ,_._ . . . O O co O •;r -r CO c:, •4- CO O I 0 0 co O CO O N N I— ,r co O O O CO O O CO O O N O •tCO CO M co O N co) M M U) M c\i. C JR it:2'm C _._. la) ,1Ai, 0 0 CO 0 C. 0 0 N N N N N N '`) CO CO CO CO CO CO U) N N N CU N N CD f J J J J J J C 0 0 0 0 0 0 _o _a _0 _0 _O ctt o' 0 0 0 0 0 0 0) _ a ``, 0 0 0 0 0 0 ' . 0 0 0 0 0 0 N C) 6CD 0 ) r c mC 5 C C C Q m Ca) 0 � ULLUUU = U p U C C C C C C O L _. _ L C.) o > (L6 � 0 L , „ „ „ , o 0 N a >73 .LL' 5 5 f, J J J co co co S 0 N (B C - C C L 0- ' C 6 CU ° . W L. . W c% (6 (B (6 (6 (6 " J O Q Q Q Q Q Q O LL L--- 0) 2 A V Q Q Q Q Q Q V Q O O O O O O Q , . L CD CD CD L 0 CD CD CD C7 CD CD L a. 4"' co L L L RS N O O O O c O O O O O O O N C) C 0 I Q .Q C I .0 .0 - .00 C ' a) J = I I J .0 2 2 2 2 2 2 2 J N 3 * u) *k *k a 0 *k 4t *k *k *k 4t *k a ,---. � 1 (1) N Ln L) 'C) N Lf) Ln u) LO LO LO LO N = G Li N N N N N N N N N N LLQ` C3)-0 1— N co ,:r Lf') CO N- CO a) � �O r- N M LC) CO r � � � - I 1 I I I I 1 I I 7 I I I I I I 'IJ Z , 0 • N NN O O N- NC7 E CCD O O N O CO CO N co- M M Lf) co- N CD a r� O VC C3) a) C O O O O O O O Q. N N N N N N L C) CO CO CCD CCD CO CO a) a) N a) a) a) a) J J J J J J C O O O O O O @. -2 -2 .Q -2 p a 0 0 0 0 0 0 C L 0) , 1._; ,,,,, co • — =0 O0 O O co O O N M 4 cri CO `Cr(I) 0_ N CI N _ Co O 5 5 5 5 C C ca vco 0 .( ' Q C C C C C C O a) L CO ."6 a) D CB Ca Ca Ca Ca Ca SCJ) a J J J J J J Sii C C C C C C CO CO CO CO co Cl. CO CO 4) LI_ co (%) O O O O O O 0CL CD_ Q 0 0 0 0 Q 0 (/) C 0 0 0 0 0 0 0 ,_ -Q- ."1-: LO L O O O O O O L L L L L COaa U) a) 2 2 2 = 2 2 2 0N 5 j ' N N N N N N N LL I- 411 .i2 ..- N CY) LC) CO I� CO 2 CV CV CV CV CV CV CV CV Z • • O N CO N O O C N O N O) O In O M O O O N CO N M M M CO d �t C rte,•! r(D 0 Q' ' -"r1„, 0 0 0 0 0 0 N N N N (N (N Cl) U) U) Cl) U) a) a) © J J J J J0 •J (U _0 -0 - co ca (15C C0l) - ■ — U o 0 0 0 0 0 aoO ok. 0 0 0 0 0 0 • 00 C\. (y) ori co a. 0 °6 p 0) (IIT3 ., Son= za -- CI -N a m u_ u_uuc c c0 c c cU (I) , CUCU C-0 CU (T5 CUJ J JUJ J J© B CC C BC 6C (6CDL( (6 (6 Q Q N Q Q Q Q QQQ 0, iCUQ O OO OO 0O Q UQO O co 0- C -C ' 0 0 C� 0 0 0 0 0 L si 0 0 0 0 0 0 0 U) >. >. >, >, >, >. >. J 0- 2 = 2 = 2 2 2 33% LO In Lf) LU t(') N :5:E. N N N N N N N U- [ �Z • • O N• CD Lf)N c") N o O O CQ O OD E1$0,,„ CC) C)- O — O N Ln co N Cr) Ci.) M o CO :411-c/3- - oss O N N N N N N CO CO CO Cfl CO C4 CU N N () U) U) ro J J J J J J a 0 0 0 0 0 0 C5 ■ — Ute o 0 o 0 0 0 0 0 0 0 0 0 1- (\i Cr) .4" ori CD 0 O -a 7 7 72 c 5 5 zo.„-(1 o3' 2 ÷3'3 cow 73 03 73 co CO CD CD N C J J J J J N CC N (6 COCD ca Co CO CO N Q_ Q_ Q_ Q. Q_ Q _ Q_ Q_ Q Q_ _ QLL Cl) O 0 0 O O O a. a. a. a. a. a. C "ft' L L (� 2 >. >+ >+ J Q 2 2 2 2 2 2 2 N kkk k Lt; 1.4 • Ln LU LU LU LU (n LU CU N N N N N N N C(I) LU CO I- o CT) CO CO CO (C) CD CO CD CD CD M • • d- N CO N O O ON N O id O O lCO E CO O O — O N co N co co-- cfO C -, 16 C! 0) 4) a O O O O O O NNNNNN CO CO CO CO CO Q,Q- 0 0 0 0 a) Q) C' U J J J J J J a n n n o a 0 0 0 0 U U U C • - 00 0 0 Co 0 0 V C_ 0 0 0 0 0 0 oQ c\i c�i d- co O(1) _ (6 +� 70 7 7 7 7 C 5 5 5 5 5 cB Cs) LLWLLLL � _0 C C C C C O L 1) J J J 9 7J CC C C C RS RS (T5 LIL. Q0 0- Q Q Q Q U) Q Q Q Q Q 0 O O O O O Q 0C C� r 0 0 0 0 0 0 Q cB C) Q-CZ 0000000W _o _0 _O _0 C � 2 2 = = 2 = 2 LO LO LO LO LO LO Lc) 5''` N N N N N N N lL U) C) N CO O N- CO E 6) C) 6 6) 6) 6) 6) 6 Z • • O O O O CO O O M O co O O) O O CO a'i, N O CD O O O �n N COp co M CO CO LO '#‘0)7,- ' .11/4,1-', ''ii o0 0 0 0 0 N N N N NQ (D CO CO CO CO CO "'' N N N N N N J J J J J .,-71 "' ..---"40 0 0 0 0 0 a: € _a 12 Q Q 0 0 0 0 0 0 CU) . — CO �:-, 000000 0) 0 0 0 0 0 0 _N V♦ (Ni ri ori cfl - Q a) x- A`.\\ '1 ,„ \‘‘‘‘‘., � _ \E,F N O ONO d' 0 (a i,,,,„ Cfl CO_ „:\.; -a -0 7 7 7 7 CO 00..;..,.:::-0:1-..: u u LL LL LL uU4 11* C C C C C C o CtS N N O N O N p mW Sii (1)\_,'„„'COai J J J J J J S CLNO ...r:': CIT Cl- ,.- r- c c C C LI 1-F,f " (0 (a fB (a RS 0 N I I I_ f ?hri4to .. Q Q Q Q Q Q Q Q Q Q Q Q LL Wil, 0 0 0 0 0 0 0_ a o- o- o- 0 s L 7,::::.0i U 0 c}. 6 (0 (12 V - 0 0 0 0 0 0 0 4) O > ° IDID -0 -9 � � � C � I o Eipa 22222 = 2 * N Ln CD Ln Ln to Ln N N N N N N N N N N (N L !:1.1‘.,.3.L. b`_ N M O l': cc?) 6) kiszL-76°:\;;10 0 0 0 0�n 0 0 0 0 U3r- — - �— • S T. c v - M Cr) m — O _C "� O O Q O k O cnO - ctso Li.- CU -F. cE w O O a) •}, Q) = 4-+ 11') Lf Lfl •— m O)!•� 4-a N M M w a, OD t-•I c-a Co> O O (15 O .c — �+ • Q) •= W C.. 4U O.c O O 0 C � w a) = N d O Q (n O cn % O CK 0 co f , 0 c0_ 0 ._,= =0 = 0_ .1.... 0 0 N O_ E (6 F- dam• • a_ • -' = U_ N N N � � OUB C6 O a) CD (/) c s- c C/) O CD_ CO p 0 2 -o0 -0 cn N Oun Ln Ln ' ' (DM w O O d:' Vo L... CO2 0- 4-- 0 CO CO cai.. mE L_ c cn a0 0 O O O L O .._. O cc3) ._ •O L -- c O O cts C/) -0 O = •— -o -o O W � O O O Cl) •—i— E N 2 -cE E of I b.0 szt. 01 0 .Rs li LII) V) • • S SECTION 13 — POST-FRACTURE WELLBORE CLEANUP AND FLUID RECOVERY PLAN 20 AAC 25.283(a)(13) Flowback will be initiated through PTS until the fluids clean up at which time it will be turned over to production. (Initial flowback fluids to be taken to CD1-01 disposal well until they are clean enough for production.) • SECTION 6 — ASSESSMENT OF EACH CASING AND CEMENTING OPERATION TO BE PERFORMED TO CONSTRUCT OR REPAIR THE WELL 20 AAC 25.283(a)(6) Casing & Cement Assessments: The 10 & 3/4" casing cement report on 11/23/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement, displaced with 10 ppg DrillPlex spud mud. Full returns were seen throughout the job. The plug bumped at 500 psi, and the floats were checked and they held. The 7-5/8" casing cement report on 12/5/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement, displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug did not bump, pressure was held on the casing. The floats were checked and they held. Summary All casing is cemented in accordance with 20 AAC 25.030 and each hydrocarbon zone penetrated by the well is isolated. Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. • S SECTION 10 — LOCATION, ORIENTATION AND A REPORT ON MECHANICAL CONDITION OF EACH WELL THAT MAY TRANSECT CONFINING ZONE 20 AAC 25.283(a)(10) The plat shows the location and orientation of each well that transects the confining zone. ConocoPhillips has formed the opinion, based on following assessments for each well and seismic, well, and other subsurface information currently available that none of these wells will interfere with containment of the hydraulic fracturing fluid within the one-half mile radius of the proposed wellbore trajectory. Casing & Cement assessments for all wells that transect the confining zone: CD5-03: The 7 & 5/8" casing cement report on 11/1/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8ppg class G cement, displaced with 11.1 ppg LSND. No returns were seen. The plug bumped at 320 psi, and the floats were checked and they held. CD5-04: 7-5/8" casing cement pump report on 6/10/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Class G cement, and displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug bumped @ 900 psi and the floats were checked and they held. CD5-05: The 7-5/8" casing cement pump report on 8/27/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Qannik Slurry cement, displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug bumped @ 1700 psi and the floats did not hold. Pressure was held on the cement. CD5-314: CD5-314 was plugged and abandoned per state regulations on 5/10/2015. CD5-315: The 7-5/8" casing cement pump report on 10/3/2015 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg class G cement and displaced with 11.1 ppg LSND. Full returns were seen throughout the job. The plug did not bump and the floats held, and pressure was held on the cement. CD5-315PB1: CD5-313PB1 was plugged and abandoned per state regulations on 9/24/2015. CD5-313PB1: CD5-313PB1 was plugged and abandoned per state regulations on 7/14/2015. CD5-313: The 7-5/8" casing cement pump report on 7/25/2015. Full returns were not seen throughout the job. The cement job was pumped with 15.8 ppg Class G cement, displaced with 11.1 ppg LSND. The plug bumped at 1,140 psi and the floats held. Summary All casing is cemented in accordance with 20 AAC 25.030 and each hydrocarbon zone penetrated by the well is isolated. Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. z a :17+ m n E O E 00 N E V cn N w a c a' in m m � o �N V ri N113) V 0 O O m n N O 2 z o a o •; o a) 0 c ✓ a w v E Q) c Ec L w 1- 4—▪ ,4--+ CO E y cc O oo C n 4-▪ -+ v L w G m 2 m }1 O ti o CO LL c O o• C o. ~ O O CC C Q� N o Oy d H co c N - n Crt f > N Q C � Q O W 0 U Steve, Attached are updated maps for all 3 applications. And below are updated wells status tables to include recently drilled wells. I'm currently on the slope, but if you need CPAI to bring over hard copies of these updates to your office let me know and I'll arrange someone to do so. Thanks, -Robbie 505-804-5246 From: Riemenschneider, Jacob W Sent: Wednesday, February 10, 2016 4:27 PM To: Blakney, Robert G Cc: Sylte, Hanna Subject: RE: [EXTERNAL]CRU CD5-09 (PTD #215-177, Sundry Application #316-096) -Application to Hydraulically Fracture I added CD5-07 to all 3 maps and included CD5-10 in the other 2 maps. Updated Table Data: CD5-09 Well API WELL NAME STATUS Type 501032071800 CD5-03 ACTIVE PROD 501032071100 CD5-04 ACTIVE PROD 501032071200 CD5-05 ACTIVE PROD Being CD5-07 Drilled N/A 501032072400 CD5-10 ACTIVE PROD 501032072600 CD5-11 ACTIVE PROD 501032071400 CD5-313 ACTIVE PROD 501032071470 CD5-313PB1 PA N/A 501032070700 CD5-314 SUSP N/A 501032071600 CD5-315 ACTIVE INJ 501032071670 CD5-315PB1 PA N/A CD5-10 Well API WELL NAME STATUS Type 501032038100 CD2-33 PA PROD 501032071800 CD5-03 ACTIVE PROD 501032071100 CD5-04 ACTIVE PROD 501032071200 CD5-05 ACTIVE PROD Being CD5-07 Drilled N/A 501032072300 CD5-09 ACTIVE PROD 501032072600 CD5-11 ACTIVE PROD 501032071400 CD5-313 ACTIVE PROD 2 • Loepp, Victoria T (DOA) From: Blakney, Robert G <Robert.G.Blakney@conocophillips.com> Sent: Tuesday, February 16, 2016 4:08 PM To: Loepp, Victoria T (DOA) Subject: RE: CRU CD5-09(PTD 215-177); CD5-11(215-198); CD5-10(215-179)Frac Sundries Attachments: CDS-11 Frac Stim AOR Spreadsheet.pdf; CD5-10 Frac Stim AOR Spreadsheet.pdf; CD5-09 Frac Stim AOR Spreadsheet.pdf Victoria, Attached are the updated spreadsheets. Let me know if you need any additional information. Thanks, -Robbie From: Loepp, Victoria T(DOA) [mailto:victoria.loepp@alaska.gov] Sent: Tuesday, February 16, 2016 9:36 AM To: Blakney, Robert G Subject: [EXTERNAL]CRU CD5-09(PTD 215-177); CD5-11(215-198); CD5-10(215-179)Frac Sundries Robert, Please update the Fracture Stimulation AOR tables with all the wells that are listed in the casing and cement assessments list for wells within the frac 1/2 mile radius. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.Loepn oaalaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loeoo@alaska.gov 1 • Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Wednesday, February 10, 2016 6:01 PM To: 'Blakney, Robert G' Cc: Bettis, Patricia K (DOA); Loepp, Victoria T(DOA) Subject: RE: [EXTERNAL]CRU CD5-09 (PTD#215-177, Sundry Application#316-096) - Application to Hydraulically Fracture Robbie, One more request: CPAI must provide casing and cement assessments for the additional wells that were added to the updated tables (below)for the applications to hydraulically fracture wells CD5-09, CD5-10 and CD5-11. Thanks again for your help, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. From: Davies, Stephen F (DOA) Sent: Wednesday, February 10, 2016 5:23 PM To: 'Blakney, Robert G' Subject: RE: [EXTERNAL]CRU CD5-09 (PTD #215-177, Sundry Application #316-096) - Application to Hydraulically Fracture Robbie, Thanks! I'll make copies and insert them into the applications. Thanks again, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. Sent from my desktop PC From: Blakney, Robert G [mailto:Robert.G.Blakney@conocoohillips.com] Sent: Wednesday, February 10, 2016 5:20 PM To: Davies, Stephen F (DOA) Cc: Bettis, Patricia K (DOA); Sylte, Hanna Subject: FW: [EXTERNAL]CRU CD5-09 (PTD #215-177, Sundry Application #316-096) - Application to Hydraulically Fracture 1 • • Davies, Stephen F (DOA) From: Blakney, Robert G <Robert.G.Blakney@conocophillips.com> Sent: Wednesday, February 10, 2016 5:20 PM To: Davies, Stephen F (DOA) Cc: Bettis, Patricia K (DOA); Sylte, Hanna Subject: FW: [EXTERNAL]CRU CD5-09 (PTD#215-177, Sundry Application #316-096) - Application to Hydraulically Fracture Attachments: cd 5_11_10febl6.pdf; cd 5_09_10feb16.pdf; cd5_10_10febl6.pdf Steve, Attached are updated maps for all 3 applications. And below are updated wells status tables to include recently drilled wells. I'm currently on the slope, but if you need CPAI to bring over hard copies of these updates to your office let me know and I'll arrange someone to do so. Thanks, -Robbie 505-804-5246 From: Riemenschneider, Jacob W Sent: Wednesday, February 10, 2016 4:27 PM To: Blakney, Robert G Cc: Sylte, Hanna Subject: RE: [EXTERNAL]CRU CD5-09 (PTD #215-177, Sundry Application #316-096) -Application to Hydraulically Fracture I added CD5-07 to all 3 maps and included CD5-10 in the other 2 maps. Updated Table Data: CD5-09 Well API WELL NAME STATUS Type 501032071800 CD5-03 ACTIVE PROD 501032071100 CD5-04 ACTIVE PROD 501032071200 CD5-05 ACTIVE PROD Being CD5-07 Drilled N/A 501032072400 CD5-10 ACTIVE PROD 501032072600 CD5-11 ACTIVE PROD 501032071400 CD5-313 ACTIVE PROD 501032071470 CD5-313PB1 PA N/A 501032070700 CD5-314 SUSP N/A 501032071600 CD5-315 ACTIVE INJ 501032071670 CD5-315PB1 PA N/A CD5-10 1 • • Well API WELL NAME STATUS Type 501032038100 CD2-33 PA PROD 501032071800 CD5-03 ACTIVE PROD 501032071100 CD5-04 ACTIVE PROD 501032071200 CD5-05 ACTIVE PROD Being CD5-07 Drilled N/A 501032072300 CD5-09 ACTIVE PROD 501032072600 CD5-11 ACTIVE PROD 501032071400 CD5-313 ACTIVE PROD 501032071470 CD5-313PB1 PA N/A 501032070700 CD5-314 SUSP N/A 501032071600 CD5-315 ACTIVE INJ 501032071670 CD5-315PB1 PA N/A CD5-11 Well API WELL NAME STATUS Type 501032038100 CD2-33 PA PROD 501032071800 CD5-03 ACTIVE PROD 501032071100 CD5-04 ACTIVE PROD 501032071200 CD5-05 ACTIVE PROD Being CD5-07 Drilled N/A 501032072300 CD5-09 ACTIVE PROD 501032072400 CD5-10 ACTIVE PROD 501032071400 CD5-313 ACTIVE PROD 501032071470 CD5-313PB1 PA N/A 501032070700 CD5-314 SUSP N/A 501032071600 CD5-315 ACTIVE INJ 501032071670 CD5-315PB1 PA N/A From: Blakney, Robert G Sent: Wednesday, February 10, 2016 1:04 PM To: Riemenschneider,Jacob W<Jacob.W.Riemenschneider@conocophillips.com> Cc: Sylte, Hanna<Hanna.Sylte@conocophillips.com> Subject: RE: [EXTERNAL]CRU CD5-09 (PTD#215-177, Sundry Application#316-096)-Application to Hydraulically Fracture Jacob, Here are the locations: S:\ANC\Longterm\Drilling&Wells Ops\Alpine\CD5\CD5-09\Completion\Frac Sundry S:\ANC\Longterm\Drilling&Wells Ops\Alpine\CD5\CD5-10\completions\Frac Sundry S:\ANC\Longterm\Drilling&Wells Ops\Alpine\CD5\CD5-11\Completions\Frac Sundry End of the day would be great! Thanks, -Robbie 2 From: Riemenschneider, Jacob W Sent: Wednesday, February 10, 2016 12:50 PM To: Blakney, Robert G Cc: Sylte, Hanna Subject: RE: [EXTERNAL]CRU CD5-09 (PTD #215-177, Sundry Application #316-096) -Application to Hydraulically Fracture Where are the Sundry application's located, so I can refer to the map and data in question. I should be able to update these maps by the end of the day. From: Blakney, Robert G Sent:Wednesday, February 10, 2016 12:04 PM To: Riemenschneider,Jacob W<Jacob.W.Riemenschneider@conocophillips.com> Cc:Sylte, Hanna<Hanna.SylteC@conocophillips.com> Subject: FW: [EXTERNAL]CRU CD5-09(PTD#215-177, Sundry Application#316-096)-Application to Hydraulically Fracture Jacob, Can you updates the plats for cd5-09, 10, &11? Thanks, -Robbie Sent with Good(www.good.com) From: Davies,Stephen F (DOA)<steve.davies@alaska.gov> Sent:Wednesday, February 10, 2016 2:07:43 PM To: Blakney, Robert G Cc: Bettis, Patricia K(DOA) Subject: [EXTERNAL]CRU CD5-09(PTD#215-177,Sundry Application#316-096)-Application to Hydraulically Fracture Robert, I'm reviewing ConocoPhillips' application to hydraulically fracture well CRU CD5-09. Could you please update the map on Plat 1 in Section 2 of the application to include all wells and plugbacks listed in Table 1, any additional wells and plugbacks that have been drilled since the application was submitted,and any wells that are currently being drilled? Thank you, Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) Phone: 907-793-1224 AOGCC: 907-279-1433 Fax: 907-276-7542 333 West 7th Avenue,Suite 100 Anchorage,AK 99501 CONFIDENTIALITY NOTICE: This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission (AOGCC),State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.The unauthorized review, use or disclosure of such information may violate state or federal law. If 3 • s you are an unintended recipient of this e-mail, please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. 4 • • Wallace, Chris D (DOA) From: Blakney, Robert G <Robert.G.Blakney@conocophillips.com> Sent: Monday, February 08, 2016 2:53 PM To: Wallace, Chris D (DOA) Cc: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL]Hydraulic Fracturing Sundry Application 316-096 CRU CD5-09 (PTD 2151770) Chris, Fair question. For cd5-10&09, we will change our pre-job tubing pressure test values to 3850 psi. Cd5-11 Mptp should also be 7,000 psi. Sorry that was left off the application. We will pt the tubing to 3,850 psi also. Let me know if you have any other questions. Thanks, -Robbie Sent with Good (www.good.com) From: Wallace, Chris D (DOA) <chris.wallace@alaska.gov> Sent: Monday, February 08, 2016 5:40:46 PM To: Blakney, Robert G Cc: Loepp,Victoria T(DOA) Subject: [EXTERNAL]Hydraulic Fracturing Sundry Application 316-096 CRU CD5-09 (PTD 2151770) Robert, We are reviewing the A-Sand stimulation sundries CD5-09, CD5-10,and CD5-11. They each make reference to tubing and IA pressure testing to 3500 psi. CD5-09 and CD5-10 reference the maximum treating pressure as 7000 psi and mention the IA backpressure of 3500 psi. The 110%testing requirement of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) do not seem to be met for these pressures? Last weekend Adam (KRU 2S-01 (PTD 2152030)) changed the frac program to say the IA popoff would be set at 4000 psi and backpressure of 3800 psi would be held. That resulted in tubing differential of 4240 psi and necessitated a tubing test to 5000 psi to satisfy the 110%testing requirement. CD5-11 doesn't mention or demonstrate a maximum anticipated treating pressure (20 AAC 25.283 (a)(12)(E)) so it is difficult to determine testing requirements of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) ? Thanks and Regards, Chris Wallace Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage,AK 99501 (907) 793-1250 (phone) (907) 276-7542 (fax) 1 chris.wallace@alaska.gov<mailto:c•.wallace@alaska.gov> • CONFIDENTIALITY NOTICE:This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793- 1250 or chris.wallace@alaska.gov<mailto:chris.wallace@alaska.gov>. 2 • • LO ' ri 0) NN 0 0N 0N O N D 0 0 0N 0N 0 NO V) O V) 0 N O4-1 Vf 0 N 0 v1 0 cn 0 V1 O V N N N N N N N N j L a) a+ U- +a 'Z-i U [C6 a a1 C L a! In L-4 cc U D o 3 C .O U tYt a1 .4c a1 3 In = 2 a V .•.. c o �a LL1 z . a C ' E t Ln — o t-) a' l0 @ v ,� v a ao °a1 o 'o fl -- v L .3 0 CC a1 d' L s o N i 4-- V73 ar N Cl. o fl.z . +' o C o o 0 0 -a +� V 0 c0 O a1 OL ri a1 Z L C ,_ o U Y ate+ a) i- `� cyl C "O C 4- OD — C r-1 U VI a1 ,+0. O aJ �6 C1 0 Ocn a� v f- cc o f 3 o mo4 =54-4) v tao c ell co p 73 in C � oly1 � Com — ▪ ;' ` ' acu � —°- v .� C O O + N c3 N L t — - - ''1 co 4- .�.+ p e1 "' +' Q a Q 3 4- a tin C '0 •L C co = Z c a- u m V' Z m - 1:3 = 0 L▪ v � Cr D p ' 0 ccv L L .] 4-, 4-. Q L (O I- Q) L N , 3 O 4--+ -0 U m O a1 O. 73iii��i �p p @ Z F- Z a o Y �a Q 3 0 o n ¢ o C C w "' 3 <-1 N C i .- � 'a j 3 O O U Q a1 r�-1 0 3 Q o O e-i -6 .a1 C f- o 'a a)CLI -le u a1 C ? % O O M C N U V C C 0 Lf1 v C Y a1 ,--4 . co v co U N r-I C of O � C!4 Nf - -6... O N Q 4, 4- p z 3 4- = o .-1 coU 'U' "- sZ U L11 > a1 '� V a) Q 0 a1 0 "0 Ln Ln o .i N co "5 to w 13) v) N Q 2 a' 5 . < . -c O 0. 0 U 0 0 . O O C Lo > 3 C C_ C L lD I- •- — . Co 0 U 00 L! 4.d I e-i 0 e1 -0 N C Q .) co d O a1 C ap d p ,..4 N - a1 m 'E O - a1 7 V Ln C N C e i 'C Z C + 0 a! C }' M N C m u v . I S? O > Cr a•4 CO l"l 0 CO O 'a F- C O C U U {-' '3 Qj \ z O o 0 7 M O C( O CD Sim a1 > Lii v °N' +� ° C13 -� C o Ln Ln '° ° Ln Q c L o @ +, a 120 Um N Ln o in a cc cn no. U co U Z N o (13 UD fl. o. OU Z C Q Z per, L) 0 MMIIIM "ZS = Zo Z a 3 0 a a, t v a, E a c.N in I a rn ao 3 a- o- Lfl a +; — a a N V 3 0 ° a. v v Q' 3 Q h a u C 3 3 c < V -0 W " `a v C) ¢ a Q m1-5 m N v � � Em 4, s a L. 'Is, a .c . o 0 bp o a 'et to a IL Q1:1/ u 0 0 - a 0 • oN J J J J J0 e.I0 0 J N E5 V) 0 5 � 0 � 0 5 L V N N N Cu .1.:_) a) a, aJ O v, LL mc m >, 1E _ +' v .co or, c o o Y U l0 }; o uo c E o .c c Q. O V pI v c F, Cu Cco U) � °o° WO v ° -1- -. = '-' � L v +� n a, > o , > 3 o N C M a. � 0 t � ~ c -0 c C •O e ,v� -ECO a • 0 a Tr E .D. ' .4.0_ Z O 0 c C 3 I- r o C Vi ca O +, c O E 2 ai co ' O co 0 0 CO tin a. C c 0_ Y c t ca 3 Y 0 2 twoo QA ./�� a) O N 'g C u, O a O 0. r-1 Ln C •� C O A w v a, O cco N 'i N rn -0 -a Y 4, co C al Y `� ai = N a, c c u -a U '>- c -v V a v 0 o > CO v .- C a a) - a) `" 1..� >, > c _ c cn > a) Sm N o 0 , a ai a) a n. u a) aa, a°'i re.1.,i• o. cco 0 to u. • 0. Q Z N .a .� > Q I � co cn I Q Y 0. d V •— O a, Z O c -, • a ami N s RI Q 4. O -s� tiiu a, c 0 0 0 >" L. a`, 3 c a c 0 N c -, c' o moi, zs a 3 I 4-, o. o ° o o a a, a = N 0 aa, a v M a, z Q. ' a, a, .Q o a c H c a o �° c M p co ao �o a zLu, a, a, v a o0 00 0o c c +. a 0 a s -a E a vas' Ll1 CO Cui. a, c ui a C L O = 0 a L +-• 0 "ts 4N V .Q v uQ >3 Q , " 0 a a , - o _ aa, s z +., a, � . o, 1 ocoo ao =U 'n cN .c , CL ,, Q �' o a 1vH v3 H a, a °a, a S O ...-- < Q V o t 4 LU. . clv z 3 'L7tr, O, „ 14. aCD C3- C3 O o v ° Q m av �' ' � To tga 4 Q , m w 0 L 1 To 8 n,l v .a a o 0 0 oa is •c o a a a o a s O. to L OD A 10 a. V V O Q • • Lo 0 et- ,moi ,moi CV a) o D N J J J J 001 N 0 i 3 N (6 N i ID _N d) a) i- + 10 0 Ll O N C ++ in CO ti �G ° ~ g Co '47, ° .�. ,1 O u ai ° +' vOtin 4-, > O .47, 01 v a) a G1 Qn ) 0 4 '3 a) RI -a E o > �- O v N V 0I o - • a) =on v aci 3 u ow m ,�- C v, L M O O. N QJ L .•� Lf) a {A L u O C O 03 N w O '�- S O U L^ CO N t' 4- C ,Oi, }' 4.. .4.•- O O -p cocuo ++CCD) om+ "O > > s f0 c tCES Z s c O C +' •3 E O a) a) +' O w- O •— a) - •C c) bp aa, a 0 _ ° a on 12.0 i 3 v o �. L •L V, 2 O _ ro a) 3 a) v u +� v .(5 •• E L ▪ co E OA 41) .a Nv UpLro O U O +•' +-1ONO " � oC coC > 'Qa - O_ E (t)L- L 40 +-• p 01 • r"( +, O. a0 oO o_ 3 Q " C4_, j u , Q '' , u () a) 2E vCo N N t6 a)) = Ui) c E L Lu a) n co 7 a) 4W I hi IA 0 L >. - Nw C = E a) a) CU a) +' O- a) a) +0, a. O "O Co tip O C tin LL H o_ 3 ._ 3 s ._ 3 I- ° °1 H `m .S a E c o c a n°i co V _ O a, L a L Ec L am` c 73 c)O c C1*-- a, • a vv v o (f)j A o a v' n Qv a 2 0 � ip 7 c . �p L ao o v c v \N � g ;E 1 Ec a 3 va E° 'c C N ' V L QOE " c ■A• ca to v a) L ,- L L cu yc a v' v • _a) o a)V 0 a) c o 0 E 0 is c a) Q u vo = ° U0c oW Qo c CrV c_ o °° LCmoul L 0 jC ,o C CD E o comt-, E —,i — I N O N,N a) N u N c Ca, ti L Iu � °�— Qj � � . ) ° 3 3 o a c 3 o ° a u ° '4-, s O. A I- ao eo I. as a U U 0 0 Q • • d � 0 fi) J J O J J J J J J 4.0 J r. 3rts N 0 L (1) LL Y•_! MINIM V �� O t p E V 1 o 1 Ii TiZ = on .0 t IX Cim Q. N dA N `6 0 v N c V -a > ct LLN o O cn • 2 a a 11 i co 0 o c,L. '� o i °'a+ °h o, aes co ts 3 Q — 4 , U o c c; a et rel cm a v c iu n' o E a 3 a ° Z n in s o 00 I eo CNA 14 M a. c o f ol:'a) . a01 t:1 o E v o o �.. v 01 VI N V 3 H = o NIZ ° -o u o ISO 4.) o c iI .-r c o' 0 oo, Q CS t3 Z.o o I:, v uQst 411 CU ,cQ U � oo L co Oo oW c o ID aA a .ma, v v o O NEOON _v _Matey 0 a: o o -. 01. L. oV! _ Z U H rNN Mo 14` R 0 c j.**-10, a E .1:1 vQ v 4 u 4 Zi v Li vC Z 'oo o o a 2 v�, c t av 4,1 it = C. u O o1 L v h0. I- o - I c a, c) i Ci O �o y c 1.4 CU c °�) o 0 Su a. • ti 4." L.0 a > v v) tn Q tn c ru�_ v ` '.� o v � � 4i` n. Z c O Q • 0 04. o N N C-i A L CO L a) 4.10N V O I � c m O • .— O c 0 V Z▪ t. rw CL Q. c Q Z to _ •- ▪L 4 d m ' in Inf� ria u. N CID CD V a • •— O = Z L. _ t tr 41 1:3 tle CFI aC v I.. 00 1 ti en cx N tf) 21 n zs CSi LI -6 Q., v Q 3es °' c Vo -� c ho iQV , � 15u p c `i t-_ N --.. ^ i a 'Cs D c, v t a v 3 0 — c :w te 0 0 a 0 V "a m _� c ° ° h °' vn oac a E v o u a,� c - CU : �.. i 0 Q ORE EI`V ED • 21 7 7 7 26774 FEB 0 3 2016 oblumberger 9'G Transmittal#: 03FEB15-SPO1 Drilling Q..,;; easurements DATA LOGGED MWD/LWD Log Product Delivery 2 I(. /2o1m K BENDER Customer: ConocoPhillips Alaska Dispatched To: AOGCC: Makana Bender Well No: CD5-09 Date Dispatched: 3-Feb-16 Job#: 15AKA0029 Dispatched By: Stephanie Pacillo Well/ Product Hardcopy Digital Copy E-Delivery Date Color Log Prints: 4 Contents on CD N/A Scope Resistivity 2" MD x x Scope Resistivity 2'TVD x x Scope Resistivity 5'MD x x Scope Resistivity 5'TVD x x LAS Digital Data N/A Contents on CD x Directional Data 1 Contents on CD Nad27 x x As-Built Survey 1 Contents on CD Nad83 x x EOW CD 1 Contents on CD Data: DLIS/ASCII x Graphics:pdf/tiff x Survey:pdf/txt x Please sign and email a copy to: Please sign and email a copy to: Richard.E.Elgarico c(Dconocophillips.com AlaskaPTSPrintCentert slb.com Ricky Elgarico Attn: Stephanie Pacillo 907-265-6580 Received By: MAAga.fria.4) �iLL • 21 577 1 26774 RECEIVED FEB 03 Zu S FINAL AOGCC NADConversion Western North Slope CD5 Alpine West Pad CD5-09 Definitive Survey Report 22 December, 2015 NAD 27 II/ • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Project Western North Slope,North Slope Alaska,United States Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-09 Well Position +N/-S 0.00 usft Northing: 5,965,872.31 usft Latitude: 70°18'49.909 N +E/-W 0.00 usft Easting: 349,385.38 usft Longitude: 151°13'14.529 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.20 usft Wellbore CD5-09 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGG M2015 11/21/2015 17.91 80.83 57,471 Design CD5-09 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.69 Vertical Section: Depth From(ND) 0 +N/-S +EI-W Direction (usft) (usft) (usft) (°) 36.69 0.00 0.00 333.00 Survey Program Date 12/22/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description Survey Date 93.00 546.00 CD5-09 Srvy#1-SLB Free Gyro(CD5-0 GYD-GC-SS Gyrodata gyro single shots 11/30/2015 3:28 575.16 2,358.25 CD5-09 Srvy#2-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 11/30/2015 3:32 2,443.92 11,199.69 CD5-09 Srvy#3-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/1/2015 9:59: 11,293.71 13,220.19 CD5-09 Srvy#4-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/2/2015 1:34: 13,298.78 23,320.20 CD5-09 Srvy#5-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/14/2015 4:21 Survey Map Map Vertical MD Inc Azi ND TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (0/1001 (ft) Survey Tool Name 36.69 0.00 0.00 36.69 -34.20 0.00 0.00 5,965,872.31 349,385.38 0.00 0.00 UNDEFINED 93.00 0.30 41.78 93.00 22.11 0.11 0.10 5,965,872.41 349,385.48 0.53 0.05 GYD-GC-SS(1) 115.00 0.28 40.07 115.00 44.11 0.19 0.17 5,965,872.50 349,385.56 0.10 0.10 NOT an Actual Survey 20"x 42" 183.00 0.22 32.85 183.00 112.11 0.43 0.35 5,965,872.73 349,385.74 0.10 0.23 GYD-GC-SS(1) 273.00 1.57 343.74 272.99 202.10 1.76 0.10 5,965,874.06 349,385.52 1.60 1.52 GYD-GC-SS(1) 363.00 2.65 345.79 362.92 292.03 4.96 -0.76 5,965,877.28 349,384.72 1.20 4.76 GYD-GC-SS(1) 453.00 3.55 348.56 452.79 381.90 9.71 -1.82 5,965,882.05 349,383.76 1.01 9.48 GYD-GC-SS(1) 546.00 4.37 347.26 545.57 474.68 15.99 -3.17 5,965,888.35 349,382.53 0.89 15.69 GYD-GC-SS(1) 575.16 4.57 347.71 574.64 503.75 18.21 -3.67 5,965,890.58 349,382.08 0.70 17.89 MWD+IFR-AK-CAZ-SC(2) 667.49 5.24 343.10 666.63 595.74 25.83 -5.68 5,965,898.25 349,380.23 0.84 25.59 MWD+IFR-AK-CAZ-SC(2) 12/22/2015 3:13:50PM Page 2 COMPASS 5000.1 Build 74 10. • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 761.82 7.61 341.40 760.36 689.47 35.88 -8.92 5,965,908.35 349,377.19 2.52 36.02 MWD+IFR-AK-CAZ-SC(2) 855.88 9.51 338.57 853.37 782.48 49.01 -13.75 5,965,921.58 349,372.62 2.07 49.91 MWD+IFR-AK-CAZ-SC(2) 950.85 13.01 338.25 946.50 875.61 66.25 -20.58 5,965,938.95 349,366.14 3.69 68.37 MWD+IFR-AK-CAZ-SC(2) 1,044.77 16.40 339.54 1,037.33 966.44 88.50 -29.13 5,965,961.36 349,358.04 3.63 92.08 MWD+IFR-AK-CAZ-SC(2) 1,139.46 18.16 341.33 1,127.74 1,056.85 115.00 -38.53 5,965,988.05 349,349.17 1.94 119.96 MWD+IFR-AK-CAZ-SC(2) 1,233.57 18.96 342.10 1,216.96 1,146.07 143.45 -47.92 5,966,016.67 349,340.35 0.89 149.57 MWD+IFR-AK-CAZ-SC(2) 1,326.79 20.99 342.40 1,304.56 1,233.67 173.78 -57.63 5,966,047.19 349,331.26 2.18 181.00 MWD+IFR-AK-CAZ-SC(2) 1,421.88 22.77 343.03 1,392.80 1,321.91 207.61 -68.15 5,966,081.23 349,321.42 1.89 215.92 MWD+IFR-AK-CAZ-SC(2) 1,516.10 24.60 342.25 1,479.08 1,408.19 243.73 -79.45 5,966,117.56 349,310.85 1.97 253.24 MWD+IFR-AK-CAZ-SC(2) 1,610.74 27.97 342.23 1,563.92 1,493.03 283.64 -92.23 5,966,157.72 349,298.87 3.56 294.60 MWD+IFR-AK-CAZ-SC(2) 1,705.35 30.81 342.83 1,646.35 1,575.46 327.93 -106.16 5,966,202.27 349,285.83 3.02 340.38 MWD+IFR-AK-CAZ-SC(2) ' 1,800.52 33.84 346.05 1,726.77 1,655.88 376.94 -119.74 5,966,251.55 349,273.23 3.66 390.22 MWD+IFR-AK-CAZ-SC(2) 1,894.07 37.12 350.02 1,802.95 1,732.06 430.05 -130.92 5,966,304.86 349,263.12 4.28 442.61 MWD+IFR-AK-CAZ-SC(2) 1,988.05 40.33 354.02 1,876.27 1,805.38 488.25 -139.01 5,966,363.21 349,256.21 4.33 498.14 MWD+IFR-AK-CAZ-SC(2) 2,082.38 44.07 357.33 1,946.14 1,875.25 551.40 -143.72 5,966,426.44 349,252.77 4.61 556.55 MWD+IFR-AK-CAZ-SC(2) 2,176.00 47.52 358.08 2,011.41 1,940.52 618.45 -146.39 5,966,493.52 349,251.44 3.73 617.50 MWD+IFR-AK-CAZ-SC(2) 2,270.75 47.92 359.66 2,075.15 2,004.26 688.54 -147.77 5,966,563.62 349,251.46 1.30 680.58 MWD+IFR-AK-CAZ-SC(2) 2,358.25 46.62 1.35 2,134.53 2,063.64 ,752.80. -147.21 5,966,627.85 349,253.31 2.05 737.59 MWD+IFR-AK-CAZ-SC(2) 2,409.20 46.45 0.86 2,169.58 2.098.69 789.77 -146.50 5.966.664.80 349,254.76 0.77 770.20 NOT an Actual Survey 10-3/4"x 13-1/2" 2,443.92 46.34 0.52 2,193.52 2,122.63 814.91 -146.20 5,966,689.93 349,255.57 0.77 792.47 MWD+IFR-AK-CAZ-SC(3) 2,456.69 46.74 1.20 2,202.31 2,131.42 824.18 -146.06 5,966,699.19 349,255.89 4.98 800.66 MWD+IFR-AK-CAZ-SC(3) 2,488.32 47.80 0.81 2,223.77 2,152.88 847.41 -145.65 5,966,722.41 349,256.77 3.47 821.18 MWD+IFR-AK-CAZ-SC(3) 2,551.10 49.99 359.58 2,265.04 2,194.15 894.71 -145.50 5,966,769.69 349,257.87 3.79 863.25 MWD+IFR-AK-CAZ-SC(3) 2,643.46 53.32 358.26 2,322.33 2,251.44 967.12 -146.89 5,966,842.11 349,257.94 3.78 928.40 MWD+IFR-AK-CAZ-SC(3) 2,737.16 57.51 357.61 2,375.51 2,304.62 1,044.20 -149.68 5,966,919.22 349,256.69 4.51 998.34 MWD+IFR-AK-CAZ-SC(3) 2,831.88 60.66 358.06 2,424.17 2,353.28 1,125.39 -152.74 5,967,000.45 349,255.26 3.35 1,072.07 MWD+IFR-AK-CAZ-SC(3) 2,925.98 60.52 0.91 2,470.38 2,399.49 1,207.35 -153.48 5,967,082.40 349,256.16 2.64 1,145.43 MWD+IFR-AK-CAZ-SC(3) 3,019.61 60.10 359.96 2,516.76 2,445.87 1,288.68 -152.86 5,967,163.70 349,258.41 0.99 1,217.62 MWD+IFR-AK-CAZ-SC(3) 3,114.15 59.59 358.55 2,564.25 2,493.36 1,370.42 -153.92 5,967,245.43 349,258.99 1.40 1,290.93 MWD+IFR-AK-CAZ-SC(3) 3,208.43 59.75 355.89 2,611.87 2,540.98 1,451.69 -157.87 5,967,326.76 349,256.68 2.44 1,365.13 MWD+IFR-AK-CAZ-SC(3) 3,302.43 60.03 355.13 2,659.02 2,588.13 1,532.75 -164.23 5,967,407.93 349,251.94 0.76 1,440.25 MWD+IFR-AK-CAZ-SC(3) 3,396.61 59.84 354.76 2,706.21 2,635.32 1,613.94 -171.42 5,967,489.24 349,246.39 0.40 1,515.86 MWD+IFR-AK-CAZ-SC(3) 3,490.92 59.87 353.95 2,753.57 2,682.68 1,695.10 -179.44 5,967,570.54 349,240.00 0.74 1,591.81 MWD+IFR-AK-CAZ-SC(3) 3,585.56 60.19 353.72 2,800.85 2,729.96 1,776.61 -188.24 5,967,652.21 349,232.83 0.40 1,668.44 MWD+IFR-AK-CAZ-SC(3) 3,680.08 59.63 353.73 2,848.23 2,777.34 1,857.91 -197.18 5,967,733.66 349,225.52 0.59 1,744.93 MWD+IFR-AK-CAZ-SC(3) 3,774.51 59.91 355.19 2,895.78 2,824.89 1,939.11 -205.06 5,967,815.00 349,219.28 1.37 1,820.85 MWD+IFR-AK-CAZ-SC(3) 3,868.91 60.15 356.98 2,942.94 2,872.05 2,020.69 -210.64 5,967,896.67 349,215.33 1.66 1,896.08 MWD+IFR-AK-CAZ-SC(3) 3,963.57 59.81 357.93 2,990.30 2,919.41 2,102.57 -214.28 5,967,978.60 349,213.34 0.94 1,970.69 MWD+IFR-AK-CAZ-SC(3) 4,058.19 59.71 358.57 3,037.95 2,967.06 2,184.28 -216.77 5,968,060.33 349,212.48 0.59 2,044.62 MWD+IFR-AK-CAZ-SC(3) 12/22/2015 3:13:50PM Page 3 COMPASS 5000.1 Build 74 i ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/100') (ft) Survey Tool Name 4,152.26 59.72 0.59 3,085.40 3,014.51 2,265.50 -217.37 5,968.141.54 349,213.51 1.85 2,117.26 MWD+IFR-AK-CAZ-SC(3) 4,246.17 59.59 0.35 3,132.84 3,061.95 2,346.54 -216.71 5,968,222.55 349,215.81 0.26 2,189.17 MWD+IFR-AK-CAZ-SC(3) 4,340.80 59.03 0.28 3,181.14 3,110.25 2,427.92 -216.26 5,968,303.89 349,217.88 0.60 2,261.47 MWD+IFR-AK-CAZ-SC(3) 4,435.44 59.28 358.84 3,229.66 3,158.77 2,509.16 -216.88 5,968,385.13 349,218.89 1.33 2,334.15 MWD+IFR-AK-CAZ-SC(3) 4,529.43 59.59 358.11 3,277.46 3,206.57 2,590.07 -219.04 5,968,466.05 349,218.36 0.75 2,407.21 MWD+IFR-AK-CAZ-SC(3) 4,622.06 59.42 355.29 3,324.47 3,253.58 2,669.74 -223.63 5,968,545.79 349,215.37 2.63 2,480.28 MWD+IFR-AK-CAZ-SC(3) 4,716.11 59.28 356.29 3,372.42 3,301.53 2,750.43 -229.57 5,968,626.58 349,211.04 0.93 2,554.87 MWD+IFR-AK-CAZ-SC(3) 4,810.46 59.32 355.29 3,420.59 3,349.70 2,831.34 -235.53 5,968,707.59 349,206.71 0.91 2,629.66 MWD+IFR-AK-CAZ-SC(3) 4,905.03 59.36 354.93 3,468.81 3,397.92 2,912.39 -242.46 5,968,788.76 349,201.41 0.33 2,705.03 MWD+IFR-AK-CAZ-SC(3) 4,999.29 59.34 355.08 3,516.87 3,445.98 2,993.17 -249.52 5,968,869.66 349,195.97 0.14 2,780.22 MWD+IFR-AK-CAZ-SC(3) 5,093.96 59.62 354.90 3,564.94 3,494.05 3,074.41 -256.64 5,968,951.02 349,190.48 0.34 2,855.84 MWD+IFR-AK-CAZ-SC(3) 5,188.13 59.52 355.59 3,612.64 3,541.75 3,155.33 -263.37 5,969,032.05 349,185.37 0.64 2,930.99 MWD+IFR-AK-CAZ-SC(3) 5,282.42 59.31 357.02 3,660.62 3,589.73 3,236.33 -268.61 5,969,113.13 349,181.77 1.32 3,005.54 MWD+IFR-AK-CAZ-SC(3) 5,377.10 59.46 359.28 3,708.84 3,637.95 3,317.76 -271.24 5,969,194.60 349,180.77 2.06 3,079.29 MWD+IFR-AK-CAZ-SC(3) 5,470.97 59.24 0.38 3,756.70 3,685.81 3,398.52 -271.48 5,969,275.33 349,182.15 1.04 3,151.35 MWD+IFR-AK-CAZ-SC(3) 5,565.44 59.54 0.40 3,804.80 3,733.91 3,479.82 -270.92 5,969,356.60 349,184.33 0.32 3,223.54 MWD+IFR-AK-CAZ-SC(3) 5,659.72 59.66 359.08 3,852.51 3,781.62 3,561.14 -271.29 5,969,437.90 349,185.60 1.21 3,296.16 MWD+IFR-AK-CAZ-SC(3) 5,754.75 59.59 358.71 3,900.56 3,829.67 3,643.11 -272.87 5,969,519.88 349,185.66 0.34 3,369.91 MWD+IFR-AK-CAZ-SC(3) 5,848.76 59.38 358.40 3,948.30 3,877.41 3,724.07 -274.91 5,969,600.86 349,185.24 0.36 3,442.98 MWD+IFR-AK-CAZ-SC(3) 5,942.57 59.38 358.06 3,996.08 3,925.19 3,804.76 -277.41 5,969,681.58 349,184.37 0.31 3,516.01 MWD+IFR-AK-CAZ-SC(3) 6,036.94 59.42 357.86 4,044.12 3,973.23 3,885.94 -280.30 5,969,762.80 349,183.10 0.19 3,589.65 MWD+IFR-AK-CAZ-SC(3) 6,130.78 59.48 358.43 4,091.82 4,020.93 3,966.71 -282.92 5,969,843.60 349,182.11 0.53 3,662.80 MWD+IFR-AK-CAZ-SC(3) 6,222.88 59.55 358.52 4,138.54 4,067.65 4,046.05 -285.03 5,969,922.96 349,181.59 0.11 3,734.46 MWD+IFR-AK-CAZ-SC(3) 6,316.99 59.51 359.12 4,186.26 4,115.37 4,127.14 -286.70 5,970,004.06 349,181.55 0.55 3,807.47 MWD+IFR-AK-CAZ-SC(3) 6,412.03 59.76 359.47 4,234.31 4,163.42 4,209.14 -287.71 5,970,086.06 349,182.18 0.41 3,880.99 MWD+IFR-AK-CAZ-SC(3) 6,504.42 59.28 359.64 4,281.17 4,210.28 4,288.76 -288.33 5,970,165.67 349,183.16 0.54 3,952.21 MWD+IFR-AK-CAZ-SC(3) 6,600.13 59.28 359.10 4,330.06 4,259.17 4,371.03 -289.23 5,970,247.94 349,183.91 0.49 4,025.93 MWD+IFR-AK-CAZ-SC(3) 6,693.94 59.25 358.96 4,378.00 4,307.11 4,451.66 -290.60 5,970,328.56 349,184.16 0.13 4,098.38 MWD+IFR-AK-CAZ-SC(3) 6,787.89 59.47 358.15 4,425.89 4,355.00 4,532.46 -292.63 5,970,409.39 349,183.74 0.78 4,171.31 MWD+IFR-AK-CAZ-SC(3) 6,881.78 59.30 357.58 4,473.70 4,402.81 4,613.21 -295.64 5,970,490.17 349,182.35 0.55 4,244.62 MWD+IFR-AK-CAZ-SC(3) 6,977.05 59.49 357.20 4,522.21 4,451.32 4,695.12 -299.38 5,970,572.14 349,180.26 0.40 4,319.30 MWD+IFR-AK-CAZ-SC(3) 7,071.32 59.42 357.15 4,570.11 4,499.22 4,776.21 -303.38 5,970,653.29 349,177.89 0.09 4,393.37 MWD+IFR-AK-CAZ-SC(3) 7,165.10 59.37 356.86 4,617.86 4,546.97 4,856.82 -307.60 5,970,733.95 349,175.29 0.27 4,467.10 MWD+IFR-AK-CAZ-SC(3) 7,258.90 59.25 357.21 4,665.73 4,594.84 4,937.37 -311.77 5,970,814.57 349,172.73 0.35 4,540.77 MWD+IFR-AK-CAZ-SC(3) 7,353.35 59.31 357.45 4,713.98 4,643.09 5,018.48 -315.55 5,970,895.73 349,170.58 0.23 4,614.75 MWD+IFR-AK-CAZ-SC(3) 7,445.60 59.31 358.27 4,761.07 4,690.18 5,097.75 -318.51 5,970,975.04 349,169.21 0.76 4,686.73 MWD+IFR-AK-CAZ-SC(3) 7,541.44 59.69 358.29 4,809.71 4,738.82 5,180.29 -320.99 5,971,057.61 349,168.39 0.40 4,761.40 MWD+IFR-AK-CAZ-SC(3) 7,635.23 59.76 0.03 4,857.00 4,786.11 5,261.28 -322.18 5,971,138.60 349,168.82 1.60 4,834.10 MWD+IFR-AK-CAZ-SC(3) 7,728.10 59.50 1.38 4,903.95 4,833.06 5,341.40 -321.20 5,971,218.67 349,171.41 1.29 4,905.04 MWD+IFR-AK-CAZ-SC(3) 7,822.87 59.66 1.36 4,951.94 4,881.05 5,423.10 -319.24 5,971,300.31 349,175.01 0.17 4,976.95 MWD+IFR-AK-CAZ-SC(3) 12/22/2015 3:13:50PM Page 4 COMPASS 5000.1 Build 74 i • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,917.89 59.59 1.42 4,999.99 4,929.10 5.505.05 -317.25 5,971 382 20 349,178.64 0.09 5,049.06 MWD+IFR-AK-CAZ-SC(3) 8,012.40 59.68 0.71 5,047.76 4,976.87 5,586.58 -315.74 5,971,463.68 349,181.79 0.66 5,121.02 MWD+IFR-AK-CAZ-SC(3) 8,106.78 59.76 359.26 5,095.35 5,024.46 5,668.08 -315.76 5,971,545.16 349,183.40 1.33 5,193.65 MWD+IFR-AK-CAZ-SC(3) 8,201.35 59.65 357.95 5,143.06 5,072.17 5,749.71 -317.75 5,971,626.80 349,183.05 1.20 5,267.28 MWD+IFR-AK-CAZ-SC(3) 8,295.22 59.20 356.36 5,190.81 5,119.92 5,830.42 -321.75 5,971,707.58 349,180.66 1.54 5,341.02 MWD+IFR-AK-CAZ-SC(3) 8,389.19 59.04 355.22 5,239.04 5,168.15 5,910.85 -327.67 5,971,788.10 349,176.36 1.06 5,415.37 MWD+IFR-AK-CAZ-SC(3) 8,483.13 59.33 356.09 5,287.16 5,216.27 5,991.30 -333.79 5,971,868.65 349,171.86 0.85 5,489.82 MWD+IFR-AK-CAZ-SC(3) 8,574.31 59.32 356.78 5,333.68 5,262.79 6,069.57 -338.66 5,971,946.99 349,168.56 0.65 5,561.77 MWD+IFR-AK-CAZ-SC(3) 8,670.31 59.12 356.56 5,382.81 5,311.92 6,151.91 -343.45 5,972,029.41 349,165.42 0.29 5,637.31 MWD+IFR-AK-CAZ-SC(3) 8,764.04 59.12 356.74 5,430.92 5,360.03 6,232.21 -348.15 5,972,109.78 349,162.33 0.16 5,711.00 MWD+IFR-AK-CAZ-SC(3) 8,856.91 59.54 357.07 5,478.29 5,407.40 6,311.97 -352.47 5,972,189.61 349,159.62 0.55 5,784.03 MWD+IFR-AK-CAZ-SC(3) 8,950.90 59.28 358.70 5,526.12 5,455.23 6,392.82 -355.45 5,972,270.50 349,158.25 1.52 5,857.42 MWD+IFR-AK-CAZ-SC(3) 9,043.29 59.25 357.92 5,573.34 5,502.45 6,472.20 -357.80 5,972,349.90 349,157.51 0.73 5,929.21 MWD+IFR-AK-CAZ-SC(3) 9,136.93 59.47 357.31 5,621.06 5,550.17 6,552.70 -361.15 5,972,430.44 349,155.77 0.61 6,002.45 MWD+IFR-AK-CAZ-SC(3) 9,231.04 59.32 357.11 5,668.97 5,598.08 6,633.60 -365.09 5,972,511.40 349,153.45 0.24 6,076.33 MWD+IFR-AK-CAZ-SC(3) 9,325.98 59.25 357.17 5,717.47 5,646.58 6,715.12 -369.16 5,972,592.98 349,151.01 0.09 6,150.81 MWD+IFR-AK-CAZ-SC(3) 9,418.71 59.53 358.00 5,764.68 5,693.79 6,794.86 -372.53 5,972,672.76 349,149.25 0.83 6,223.39 MWD+IFR-AK-CAZ-SC(3) 9,512.39 59.48 359.56 5,812.23 5,741.34 6,875.56 -374.24 5,972,753.48 349,149.15 1.44 6,296.07 MWD+IFR-AK-CAZ-SC(3) 9,607.42 59.53 359.06 5,860.45 5,789.56 6,957.44 -375.23 5,972,835,35 349,149.81 0.46 6,369.47 MWD+IFR-AK-CAZ-SC(3) 9,701.39 59.56 358.72 5,908.08 5,837.19 7,038.42 -376.80 5,972,916.35 349,149,86 0.31 6,442.35 MWD+IFR-AK-CAZ-SC(3) 9,794.77 59.38 358.89 5,955.52 5,884.63 7,118.84 -378.48 5,972,996.78 349,149.80 0.25 6,514.76 MWD+IFR-AK-CAZ-SC(3) 9,889.44 59.56 358.63 6,003.61 5,932.72 7,200.37 -380.24 5,973,078.32 349,149.67 0.30 6,588.20 MWD+IFR-AK-CAZ-SC(3) 9,983.12 59.42 358.59 6,051.17 5,980.28 7,281.05 -382.20 5,973,159.02 349,149.33 0.15 6,660.98 MWD+IFR-AK-CAZ-SC(3) 10,076.68 59.46 358.60 6,098.74 6,027.85 7,361.59 -384.18 5,973,239.58 349,148.97 0.04 6,733.64 MWD+IFR-AK-CAZ-SC(3) 10,170.22 59.53 357.96 6,146.22 6,075.33 7,442.15 -386.59 5,973,320.16 349,148.17 0.59 6,806.51 MWD+IFR-AK-CAZ-SC(3) 10,264.10 59.38 358.31 6,193.93 6,123.04 7,522.96 -389.23 5,973,401.00 349,147.16 0.36 6,879.71 MWD+IFR-AK-CAZ-SC(3) 10,357.91 59.46 357.60 6,241.66 6,170.77 7,603.67 -392.11 5,973,481,74 349,145.90 0.66 6,952.93 MWD+IFR-AK-CAZ-SC(3) 10,451.19 59.49 357.37 6,289.04 6,218.15 7,683.94 -395.63 5,973,562.07 349,143.98 0.21 7,026.06 MWD+IFR-AK-CAZ-SC(3) 10,545.42 59.39 356.87 6,336.95 6,266.06 7,764.98 -399.71 5,973,643.17 349,141.53 0.47 7,100.11 MWD+IFR-AK-CAZ-SC(3) 10,638.42 59.45 355.38 6,384.26 6,313.37 7,844.86 -405.12 5,973,723.13 349,137.72 1.38 7,173.74 MWD+IFR-AK-CAZ-SC(3) 10,732.21 59.45 355.16 6,431.93 6,361.04 7,925.36 -411.78 5,973,803.74 349,132.68 0.20 7,248.49 MWD+IFR-AK-CAZ-SC(3) 10,824.67 59.53 355.79 6,478.87 6,407.98 8,004.76 -418.07 5,973,883.25 349,127.99 0.59 7,322.10 MWD+IFR-AK-CAZ-SC(3) 10,918.44 59.34 356.53 6,526.56 6,455.67 8,085.32 -423.47 5,973,963.90 349,124.20 0.71 7,396.33 MWD+IFR-AK-CAZ-SC(3) 11,012.71 59.60 356.47 6,574.45 6,503.56 8,166.37 -428.43 5,974,045.02 349,120.87 0.28 7,470,80 MWD+IFR-AK-CAZ-SC(3) 11,105.90 59.50 357.79 6,621.68 6,550.79 8,246.61 -432.45 5,974,125.31 349,118.46 1.23 7,544.11 MWD+IFR-AK-CAZ-SC(3) 11,199.69 59.33 358.09 6,669.40 6,598.51 8,327.29 -435.36 5,974,206.04 349,117.17 0.33 7,617.32 MWD+IFR-AK-CAZ-SC(3) 11,293.71 59.18 358.96 6,717.46 6,646.57 8,408.07 -437.44 5,974,286.84 349,116.72 0.81 7,690.24 MWD+IFR-AK-CAZ-SC(4) 11,385.70 59.40 359.15 6,764.44 6,693.55 8,487.15 -438.74 5,974,365.92 349,117.00 0.30 7,761.29 MWD+IFR-AK-CAZ-SC(4) 11,479.40 59.44 358.56 6,812.11 6,741.22 8,567.80 -440.35 5,974,446.58 349,117.00 0.54 7,833.88 MWD+IFR-AK-CAZ-SC(4) 11,573.11 59.33 358.03 6,859.83 6,788.94 8,648.41 -442.75 5,974,527.22 349,116.22 0.50 7,906.80 MWD+IFR-AK-CAZ-SC(4) 12/22/2015 3:13:50PM Page 5 COMPASS 5000.1 Build 74 • • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,666.63 59.48 358.17 6,907.43 6,836.54 8,728.87 -445.42 5,974,607.71 349,115.17 0.21 7,979.70 MWD+IFR-AK-CAZ-SC(4) 11,760.65 59.40 357.62 6,955.24 6,884.35 8,809.78 -448.40 5,974,688.65 349,113.82 0.51 8,053.14 MWD+IFR-AK-CAZ-SC(4) 11,853.82 59.40 356.06 7,002.67 6,931.78 8,889.85 -452.82 5,974,768.79 349,111.00 1.44 8,126.48 MWD+IFR-AK-CAZ-SC(4) 11,948.30 59.40 355.80 7,050.76 6,979.87 8,970.96 -458.59 5,974,850.00 349,106.86 0.24 8,201.38 MWD+IFR-AK-CAZ-SC(4) 12,041.39 59.44 354.66 7,098.12 7,027.23 9,050.83 -465.25 5,974,929.97 349,101.80 1.06 8,275.57 MWD+IFR-AK-CAZ-SC(4) 12,135.10 61.27 352.50 7,144.47 7,073.58 9,131.75 -474.37 5,975,011.05 349,094.31 2.80 8,351.81 MWD+IFR-AK-CAZ-SC(4) 12,227.99 63.06 349.58 7,187.85 7,116.96 9,212.87 -487.18 5,975,092.41 349,083.13 3.38 8,429.90 MWD+IFR-AK-CAZ-SC(4) 12,322.50 66.73 347.53 7,227.95 7,157.06 9,296.72 -504.18 5,975,176.58 349,067.82 4.35 8,512.33 MWD+IFR-AK-CAZ-SC(4) 12,415.42 69.47 345.52 7,262.61 7,191.72 9,380.55 -524.28 5,975,260.79 349,049.40 3.57 8,596.15 MWD+IFR-AK-CAZ-SC(4) 12,509.35 72.28 345.26 7,293.38 7,222.49 9,466.42 -546.66 5,975,347.08 349,028.75 3.00 8,682.82 MWD+IFR-AK-CAZ-SC(4) 12,603.05 73.78 344.48 7,320.72 7,249.83 9,552.93 -570.06 5,975,434.03 349,007.09 1.79 8,770.52 MWD+IFR-AK-CAZ-SC(4) 12,696.90 76.53 342.64 7,344.77 7,273.88 9,639.92 -595.74 5,975,521.52 348,983.17 3.49 8,859.69 MWD+IFR-AK-CAZ-SC(4) 12,790.82 78.06 341.04 7,365.43 7,294.54 9,726.97 -624.29 5,975,609.12 348,956.36 2.33 8,950.22 MWD+IFR-AK-CAZ-SC(4) 12,884.76 80.25 339.37 7,383.10 7,312.21 9,813.77 -655.54 5,975,696.52 348,926.87 2.91 9,041.74 MWD+IFR-AK-CAZ-SC(4) 12,978.58 83.93 338.06 7,396.01 7,325.12 9,900.34 -689.27 5,975,783.74 348,894.88 4.16 9,134.19 MWD+IFR-AK-CAZ-SC(4) 13,072.13 85.92 336.14 7,404.29 7,333.40 9,986.17 -725.53 5,975,870.28 348,860.35 2.95 9,227.13 MWD+IFR-AK-CAZ-SC(4) 13,092.98 85.90 335.20 7,405.77 7,334.88 10,005.12 -734.10 5,975,889.39 348,852.17 4.49 9,247.90 MWD+IFR-AK-CAZ-SC(4) CD5-09 01.Heel 071615 JB 13,165.31 85.82 331.95 7,411.00 7,340.11 10,069.71 -766.20 5,975,954.61 348,821.37 4.49 9,320.03 MWD+IFR-AK-CAZ-SC(4) 13,220.19 85.57 330.70 7,415.12 7,344.23 10,117.73 -792.46 5,976,003.14 348,796.09 2.32 9,374.73 MWD+IFR-AK-CAZ-SC(4) 13,271.70 87.07 331.40 7.418.43 7,347.54 10,162 70 -817.34 5.976,048 61 348,772.11 3.21 9,426.10 NOT an Actual Survey • 7-5/8"x 9-7/8"x11" 13,298.78 87.86 331.76 7,419.62 7,348.73 10,186.50 -830.21 5,976,072.65 348,759.72 3.21 9,453.14 MWD+IFR-AK-CAZ-SC(5) 13,393.40 90.35 332.27 7,421.10 7,350.21 10,270.04 -874.61 5,976,157.06 348,717.01 2.69 9,547.73 MWD+IFR-AK-CAZ-SC(5) 13,488.75 89.81 330.97 7,420.97 7,350.08 10,353.92 -919.93 5,976,241.83 348,673.39 1.48 9,643.05 MWD+IFR-AK-CAZ-SC(5) 13,584.28 91.18 331.92 7,420.14 7,349.25 10,437.83 -965.59 5,976,326.63 348,629.42 1.75 9,738.54 MWD+IFR-AK-CAZ-SC(5) 13,679.30 90.43 329.89 7,418.81 7,347.92 10,520.84 -1,011.78 5,976,410.55 348,584.91 2.28 9,833.48 MWD+IFR-AK-CAZ-SC(5) 13,777.18 90.85 329.21 7,417.71 7,346.82 10,605.22 -1,061.38 5,976,495.89 348,537.01 0.82 9,931.18 MWD+IFR-AK-CAZ-SC(5) 13,869.81 91.79 329.18 7,415.58 7,344.69 10,684.76 -1,108.81 5,976,576.36 348,491.19 1.02 10,023.58 MWD+IFR-AK-CAZ-SC(5) 13,965.43 91.29 328.72 7,413.01 7,342.12 10,766.65 -1,158.11 5,976,659.22 348,443.55 0.71 10,118.92 MWD+IFR-AK-CAZ-SC(5) 14,057.34 90.71 329.01 7,411.41 7,340.52 10,845.30 -1,205.62 5,976,738.81 348,397.63 0.71 10,210.58 MWD+IFR-AK-CAZ-SC(5) 14,149.46 90.16 330.80 7,410.71 7,339.82 10,925.00 -1,251.81 5,976,819.41 348,353.05 2.03 10,302.56 MWD+IFR-AK-CAZ-SC(5) 14,241.29 89.92 331.02 7,410.64 7,339.75 11,005.25 -1,296.46 5,976,900.53 348,310.02 0.35 10,394.33 MWD+IFR-AK-CAZ-SC(5) 14,333.64 90.30 333.76 7,410.47 7,339.58 11,087.07 -1,339.25 5,976,983.19 348,268.88 3.00 10,486.66 MWD+IFR-AK-CAZ-SC(5) 14,424.32 90.43 333.85 7,409.89 7,339.00 11,168.44 -1,379.28 5,977,065.33 348,230.50 0.17 10,577.33 MWD+IFR-AK-CAZ-SC(5) 14,515.06 90.85 334.74 7,408.87 7,337.98 11,250.19 -1,418.64 5,977,147.85 348,192.79 1.08 10,668.04 MWD+IFR-AK-CAZ-SC(5) 14,605.92 90.78 334.03 7,407.58 7,336.69 11,332.11 -1,457.91 5,977,230.54 348,155.17 0.79 10,758.87 MWD+IFR-AK-CAZ-SC(5) 14,701.10 91.51 335.49 7,405.68 7,334.79 11,418.19 -1,498.49 5,977,317.40 348,116.33 1.71 10,853.98 MWD+IFR-AK-CAZ-SC(5) 14,789.32 91.19 335.48 7,403.60 7,332.71 11,498.43 -1,535.09 5,977,398.36 348,081.36 0.36 10,942.09 MWD+IFR-AK-CAZ-SC(5) 14,880.97 91.22 335.35 7,401.67 7,330.78 11,581.75 -1,573.21 5,977,482.42 348,044.92 0.15 11,033.64 MWD+IFR-AK-CAZ-SC(5) 12/22/2015 3:13:50PM Page 6 COMPASS 5000.1 Build 74 III III • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +EI-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 14,972.22 91.33 335.42 7,399.64 7,328.75 11,664.69 -1,611.20 5,977,566.10 348,008.59 0.14 11,124.79 MWD+IFR-AK-CAZ-SC(5) 15,064.37 91.36 335.52 7,397.48 7,326.59 11,748.50 -1,649.45 5,977,650.66 347,972.04 0.11 11,216.83 MWD+IFR-AK-CAZ-SC(5) 15,156.79 91.29 334.56 7,395.34 7,324.45 11,832.27 -1,688.44 5,977,735.18 347,934.74 1.04 11,309.16 MWD+IFR-AK-CAZ-SC(5) 15,248.43 91.09 333.48 7,393.44 7,322.55 11,914.63 -1,728.58 5,977,818.32 347,896.27 1.20 11,400.77 MWD+IFR-AK-CAZ-SC(5) 15,339.45 90.09 333.27 7,392.50 7,321.61 11,995.99 -1,769.36 5,977,900.48 347,857.12 1.12 11,491.78 MWD+IFR-AK-CAZ-SC(5) 15,431.64 90.38 332.92 7,392.13 7,321.24 12,078.20 -1,811.08 5,977,983.50 347,817.07 0.49 11,583.97 MWD+IFR-AK-CAZ-SC(5) 15,524.08 89.34 332.63 7,392.35 7,321.46 12,160.40 -1,853.37 5,978,066.53 347,776.44 1.17 11,676.40 MWD+IFR-AK-CAZ-SC(5) 15,615.02 89.41 332.43 7,393.34 7,322.45 12,241.08 -1,895.32 5,978,148.03 347,736.12 0.23 11,767.34 MWD+IFR-AK-CAZ-SC(5) 15,706.48 88.72 332.25 7,394.84 7,323.95 12,322.07 -1,937.77 5,978,229.85 347,695.30 0.78 11,858.78 MWD+IFR-AK-CAZ-SC(5) 15,798.23 88.86 332.68 7,396.77 7,325.88 12,403.41 -1,980.17 5,978,312.02 347,654.54 0.49 11,950.50 MWD+IFR-AK-CAZ-SC(5) 15,889.68 88.86 332.60 7,398.59 7,327.70 12,484.62 -2,022.19 5,978,394.05 347,614.16 0.09 12,041.93 MWD+IFR-AK-CAZ-SC(5) 15,982.04 88.14 330.98 7,401.01 7,330.12 12,565.98 -2,065.84 5,978,476.26 347,572.16 1.92 12,134.24 MWD+IFR-AK-CAZ-SC(5) 16,074.47 88.24 330.61 7,403.93 7,333.04 12,646.62 -2,110.91 5,978,557.78 347,528.72 0.41 12,226.55 MWD+IFR-AK-CAZ-SC(5) 16,169.87 88.14 331.37 7,406.94 7,336.05 12,730.00 -2,157.16 5,978,642.07 347,484.16 0.80 12,321.85 MWD+IFR-AK-CAZ-SC(5) 16,265.04 87.83 331.29 7,410.29 7,339.40 12,813.45 -2,202.79 5,978,726.41 347,440.22 0.34 12,416.92 MWD+IFR-AK-CAZ-SC(5) 16,361.06 88.72 331.21 7,413.18 7,342.29 12,897.60 -2,248.95 5,978,811.46 347,395.75 0.93 12,512.85 MWD+IFR-AK-CAZ-SC(5) 16,455.21 89.93 332.11 7,414.29 7,343.40 12,980.46 -2,293.64 5,978,895.19 347,352.74 1.60 12,606.96 MWD+IFR-AK-CAZ-SC(5) 16,550.50 90.20 332.21 7,414.18 7,343.29 13,064.72 -2,338.14 5,978,980.32 347,309.94 0.30 12,702.24 MWD+IFR-AK-CAZ-SC(5) 16,645.74 90.64 332.31 7,413.48 7,342.59 13,149.01 -2,382.47 5,979,065.48 347,267.31 0.47 12,797.47 MWD+IFR-AK-CAZ-SC(5) 16,741.50 92.38 333.71 7,410.96 7,340.07 13,234.30 -2,425.91 5,979,151.62 347,225.59 2.33 12,893.19 MWD+IFR-AK-CAZ-SC(5) 16,836.02 92.29 332.19 7,407.11 7,336.22 13,318.41 -2,468.86 5,979,236.57 347,184.35 1.61 12,987.63 MWD+IFR-AK-CAZ-SC(5) 16,932.04 93.90 331.99 7,401.92 7,331.03 13,403.14 -2,513.74 5,979,322.17 347,141.18 1.69 13,083.49 MWD+IFR-AK-CAZ-SC(5) 17,027.38 95.12 332.97 7,394.43 7,323.54 13,487.42 -2,557.65 5,979,407.32 347,098.97 1.64 13,178.53 MWD+IFR-AK-CAZ-SC(5) 17,122.26 95.16 332.89 7,385.93 7,315.04 13,571.57 -2,600.66 5,979,492.30 347,057.66 0.09 13,273.03 MWD+IFR-AK-CAZ-SC(5) 17,217.31 92.94 333.09 7,379.21 7,308.32 13,656.04 -2,643.71 5,979,577.61 347,016.31 2.35 13,367.84 MWD+IFR-AK-CAZ-SC(5) 17,312.84 89.76 329.64 7,376.96 7,306.07 13,739.83 -2,689.47 5,979,662.30 346,972.25 4.91 13,463.28 MWD+IFR-AK-CAZ-SC(5) 17,408.01 89.75 329.23 7,377.37 7,306.48 13,821.78 -2,737.86 5,979,745.19 346,925.51 0.43 13,558.26 MWD+IFR-AK-CAZ-SC(5) 17,504.06 89.23 328.70 7,378.22 7,307.33 13,904.08 -2,787.38 5,979,828.46 346,877.66 0.77 13,654.07 MWD+IFR-AK-CAZ-SC(5) 17,598.25 88.37 329.38 7,380.20 7,309.31 13,984.83 -2,835.82 5,979,910.16 346,830.85 1.16 13,748.01 MWD+IFR-AK-CAZ-SC(5) 17,693.83 89.28 330.05 7,382.16 7,311.27 14,067.35 -2,884.01 5,979,993.62 346,784.33 1.18 13,843.41 MWD+IFR-AK-CAZ-SC(5) 17,789.50 89.13 330.46 7,383.48 7,312.59 14,150.40 -2,931.48 5,980,077.61 346,738.54 0.46 13,938.96 MWD+IFR-AK-CAZ-SC(5) 17,884.87 90.53 332.56 7,383.77 7,312.88 14,234.22 -2,976.96 5,980,162.31 346,694.75 2.65 14,034.29 MWD+IFR-AK-CAZ-SC(5) 17,979.94 89.66 332.25 7,383.61 7,312.72 14,318.47 -3,021.00 5,980,247.43 346,652.41 0.97 14,129.36 MWD+IFR-AK-CAZ-SC(5) 18,075.99 87.65 333.01 7,385.86 7,314.97 14,403.74 -3,065.14 5,980,333.56 346,609.99 2.24 14,225.37 MWD+IFR-AK-CAZ-SC(5) 18,170.94 87.49 334.72 7,389.89 7,319.00 14,488.90 -3,106.93 5,980,419.54 346,569.93 1.81 14,320.22 MWD+IFR-AK-CAZ-SC(5) 18,266.27 88.17 337.41 7,393.50 7,322.61 14,575.96 -3,145.57 5,980,507.35 346,533.04 2.91 14,415.34 MWD+IFR-AK-CAZ-SC(5) 18,360.74 88.65 338.94 7,396.12 7,325.23 14,663.63 -3,180.68 5,980,595.69 346,499.70 1.70 14,509.38 MWD+IFR-AK-CAZ-SC(5) 18,456.23 89.20 338.12 7,397.91 7,327.02 14,752.47 -3,215.62 5,980,685.21 346,466.55 1.03 14,604.41 MWD+IFR-AK-CAZ-SC(5) 18,552.27 90.42 336.82 7,398.23 7,327.34 14,841.18 -3,252.42 5,980,774.63 346,431.54 1.86 14,700.15 MWD+IFR-AK-CAZ-SC(5) 18,646.08 93.90 335.53 7,394.70 7,323.81 14,926.92 -3,290.28 5,980,861.11 346,395.41 3.96 14,793.74 MWD+IFR-AK-CAZ-SC(5) 12/22/2015 3:13:50PM Page 7 COMPASS 5000.1 Build 74 • • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 18,740.95 93.60 334.92 7388.49 7,317.60 15,012.87 -3,329.95 5,980,947.83 346,357.48 0.72 14,888.33 MWD+IFR-AK-CAZ-SC(5) 18,837.09 92.29 332.55 7,383.55 7,312.66 15,098.96 -3,372.44 5,981,034.75 346,316.73 2.81 14,984.33 MWD+IFR-AK-CAZ-SC(5) 18,933.03 91.36 330.15 7,380.50 7,309.61 15,183.11 -3,418.41 5,981,119.80 346,272.46 2.68 15,080.17 MWD+IFR-AK-CAZ-SC(5) 19,028.35 91.94 329.26 7,377.75 7,306.86 15,265.37 -3,466.47 5,981,203.01 346,226.06 1.11 15,175.29 MWD+IFR-AK-CAZ-SC(5) 19,122.76 92.53 329.67 7,374.07 7,303.18 15,346.63 -3,514.40 5,981,285.20 346,179.77 0.76 15,269.45 MWD+IFR-AK-CAZ-SC(5) 19,217.93 92.94 328.77 7,369.53 7,298.64 15,428.30 -3,563.05 5,981,367.82 346,132.78 1.04 15,364.31 MWD+IFR-AK-CAZ-SC(5) 19,313.93 93.14 328.50 7,364.44 7,293.55 15,510.16 -3,612.94 5,981,450.66 346,084.54 0.35 15,459.89 MWD+IFR-AK-CAZ-SC(5) 19,408.98 93.42 328.40 7,359.00 7,288.11 15,591.02 -3,662.60 5,981,532.50 346,036.52 0.31 15,554.49 MWD+IFR-AK-CAZ-SC(5) 19,504.33 93.43 329.24 7,353.30 7,282.41 15,672.45 -3,711.87 5,981,614.89 345,988.89 0.88 15,649.41 MWD+IFR-AK-CAZ-SC(5) 19,600.30 92.36 328.92 7,348.46 7,277.57 15,754.68 -3,761.12 5,981,698.08 345,941.30 1.16 15,745.04 MWD+IFR-AK-CAZ-SC(5) 19,694.83 91.12 330.22 7,345.59 7,274.70 15,836.15 -3,808.98 5,981,780.49 345,895.09 1.90 15,839.35 MWD+IFR-AK-CAZ-SC(5) 19,790.10 90.79 331.85 7,344.00 7,273.11 15,919.48 -3,855.11 5,981,864.73 345,850.65 1.75 15,934.55 MWD+IFR-AK-CAZ-SC(5) 19,885.46 89.37 332.50 7,343.86 7,272.97 16,003.82 -3,899.62 5,981,949.93 345,807.84 1.64 16,029.89 MWD+IFR-AK-CAZ-SC(5) 19,981.63 88.79 332.87 7,345.41 7,274.52 16,089.25 -3,943.74 5,982,036.23 345,765.45 0.72 16,126.05 MWD+IFR-AK-CAZ-SC(5) 20,076.59 88.27 333.24 7,347.84 7,276.95 16,173.87 -3,986.76 5,982,121,69 345,724.14 0.67 16,220.98 MWD+IFR-AK-CAZ-SC(5) 20,172.24 89.10 333.02 7,350.04 7,279.15 16,259.17 -4,029.98 5,982,207.83 345,682.64 0.90 16,316.60 MWD+IFR-AK-CAZ-SC(5) 20,266.72 89.58 333.67 7,351.13 7,280.24 16,343.61 -4,072.36 5,982,293.09 345,641.97 0.86 16,411.07 MWD+IFR-AK-CAZ-SC(5) 20,359.49 89.42 333.12 7,351.94 7,281.05 16,426.55 -4,113,91 5,982,376.85 345,602.09 0.62 16,503.84 MWD+IFR-AK-CAZ-SC(5) CD5-09 02.Toe 071615 JB 20,362.43 89.41 333.10 7,351.97 7,281.08 16,429.17 -4,115.23 5,982,379.49 345,600.82 0.62 16,506.78 MWD+IFR-AK-CAZ-SC(5) 20,457.39 89.48 332.21 7,352.89 7,282.00 16,513.51 -4,158.85 5,982,464.69 345,558.91 0.94 16,601.73 MWD+IFR-AK-CAZ-SC(5) 20,552.74 89.68 332.02 7,353.59 7,282.70 16,597.79 -4,203.44 5,982,549.84 345,516.01 0.29 16,697.06 MWD+IFR-AK-CAZ-SC(5) 20,648.27 89.97 331.72 7,353.88 7,282.99 16,682.04 -4,248.48 5,982,634.96 345,472.68 0.44 16,792.57 MWD+IFR-AK-CAZ-SC(5) 20,743.09 89.30 330.89 7,354.49 7,283.60 16,765.21 -4,294.01 5,982,719.03 345,428.83 1.12 16,887.35 MWD+IFR-AK-CAZ-SC(5) 20,839.11 89.68 328.91 7,355.34 7,284.45 16,848.27 -4,342.16 5,982,803.03 345,382,36 2.10 16,983.22 MWD+IFR-AK-CAZ-SC(5) 20,932.92 89.37 327.28 7,356.12 7,285.23 16,927.91 -4,391.74 5,982,883.64 345,334.39 1.77 17,076.68 MWD+IFR-AK-CAZ-SC(5) 21,028.98 89.92 327.40 7,356.71 7,285.82 17,008.78 -4,443.57 5,982,965.53 345,284.19 0.59 17,172.27 MWD+IFR-AK-CAZ-SC(5) 21,124.90 89.78 328.18 7,356.96 7,286.07 17,089.93 -4,494.70 5,983,047,69 345,234.71 0.83 17,267.79 MWD+IFR-AK-CAZ-SC(5) 21,219.89 90.16 329.64 7,357.01 7,286.12 17,171.28 -4,543.75 5,983,129.99 345,187.30 1.59 17,362.54 MWD+IFR-AK-CAZ-SC(5) 21,314.92 90.23 331.45 7,356.69 7,285.80 17,254.02 -4,590,48 5,983,213.65 345,142.25 1.91 17,457.48 MWD+IFR-AK-CAZ-SC(5) 21,409.43 90.81 331.39 7,355.83 7,284.94 17,337.01 -4,635.69 5,983,297.52 345,098.71 0.62 17,551.95 MWD+IFR-AK-CAZ-SC(5) 21,505.56 91.45 331.54 7,353.94 7,283.05 17,421.44 -4,681.60 5,983,382.85 345,054.51 0.68 17,648.02 MWD+IFR-AK-CAZ-SC(5) 21,600.74 89.95 329.74 7,352.77 7,281.88 17,504.39 -4,728.26 5,983,466.71 345,009.53 2.46 17,743.11 MWD+IFR-AK-CAZ-SC(5) 21,694.56 89.30 330.19 7,353.39 7,282.50 17,585.61 -4,775.22 5,983,548.85 344,964.21 0.84 17,836.79 MWD+IFR-AK-CAZ-SC(5) 21,790.87 89.34 329.37 7,354.53 7,283.64 17,668.82 -4,823.69 5,983,633.01 344,917.42 0.85 17,932.94 MWD+IFR-AK-CAZ-SC(5) 21,885.81 88.79 328.93 7,356.08 7,285.19 17,750.32 -4,872.37 5,983,715.46 344,870.39 0.74 18,027.66 MWD+IFR-AK-CAZ-SC(5) 21,985.54 90.08 332.33 7,357.06 7,286.17 17,837.21 -4,921.27 5,983,803.31 344,823.25 3.65 18,127.28 MWD+IFR-AK-CAZ-SC(5) 22,077.57 89.82 333.54 7,357.14 7,286.25 17,919.16 -4,963.14 5,983,886.08 344,783.03 1.34 18,219.31 MWD+IFR-AK-CAZ-SC(5) 22,172.00 90.23 338.29 7,357.10 7,286.21 18,005.34 -5,001.67 5,983,973.01 344,746.24 5.05 18,313.59 MWD+IFR-AK-CAZ-SC(5) 22,267.46 91.33 342.11 7,355.80 7,284.91 18,095.13 -5,033.99 5,984,063.43 344,715.73 4.16 18,408.27 MWD+IFR-AK-CAZ-SC(5) 12/22/2015 3:13:50PM Page 8 COMPASS 5000.1 Build 74 • • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,357.66 92.69 344.76 7,352.64 7,281.75 18,181.53 -5,059.69 5,984,150.31 344,691.77 3.30 18,496.91 MWD+1FR-AK-CAZ-SC(5) 22,450.47 92.60 344.09 7,348.36 7,277.47 18,270.83 -5,084.59 5,984,240.09 344,668.67 0.73 18,587.79 MWD+IFR-AK-CAZ-SC(5) 22,545.90 94.13 343.79 7,342.76 7,271.87 18,362.38 -5,110.94 5,984,332.14 344,644.16 1.63 18,681.32 MWD+IFR-AK-CAZ-SC(5) 22,645.88 94.05 339.66 7,335.62 7,264.73 18,457.05 -5,142.20 5,984,427.42 344,614.81 4.12 18,779.87 MWD+IFR-AK-CAZ-SC(5) 22,745.10 92.44 334.33 7,330.00 7,259.11 18,548.20 -5,180.91 5,984,519.31 344,577.94 5.60 18,878.65 MWD+IFR-AK-CAZ-SC(5) 22,840.21 93.04 331.02 7,325.45 7,254.56 18,632.59 -5,224.51 5,984,604.55 344,536.04 3.53 18,973.63 MWD+IFR-AK-CAZ-SC(5) 22,937.16 90.67 325.02 7,322.31 7,251.42 18,714.73 -5,275.80 5,984,687.71 344,486.41 6.65 19,070.12 MWD+IFR-AK-CAZ-SC(5) 23,029.65 89.95 322.48 7,321.81 7,250.92 18,789.32 -5,330.49 5,984,763.36 344,433.24 2.85 19,161.39 MWD+IFR-AK-CAZ-SC(5) 23,126.46 90.35 317.85 7,321.56 7,250.67 18,863.63 -5,392.49 5,984,838.91 344,372.75 4.80 19,255.76 MWD+1FR-AK-CAZ-SC(5) 23,220.21 89.40 312.45 7,321.76 7,250.87 18,930.07 -5,458.58 5,984,906.65 344,308.01 5.85 19,344.96 MWD+IFR-AK-CAZ-SC(5) 23,320.20 85.99 310.97 7,325.78 7,254.89 18,996.54 -5,533.15 5,984,974.60 344,234.79 3.72 19,438.04 MWD+IFR-AK-CAZ-SC(5) 23,371 00 85.99 310.97 7,329.34 7,258.45 19.029.76 -5.571.41 5.985.008 58 344,197.20 0.00 19,485 71 NOT an Actual Survey 4-1/2"x 6-1/2" 23.381.00 85.99 310.97 7,330.04 7,259.15 19,036.31 -5,578.94 5,985,015.27 344,189.81 0.00 19,494.26 PROJECTED to TD Projection to Bit 12/22/2015 3:13:50PM Page 9 COMPASS 5000.1 Build 79 • 0 . a (} L. o 1 b $ ( m 2 k }$ \ a) 2 :5 a) . , .0.\) rj k c .,-,, c ,, u . ® \ {/) 2 0 a) (V'S.. S2 -c % >t O 0 / @ lig - % 0 -a T, ° \ @ •— : 2 k 0 / 2 L. C 0 2 o 0 2)§ ■ 2 7 k O O f!§ 0 W k U o 2 ,0 ƒ\/ 0 2 ■ % / 3 _ C 2 t k m a > ƒ k @= Ct = 42 0 m CID m CD .rn a 17) I-=-J wELIEE a > cok t 0 co £ 45 CO } 0 g Et k 6 . • 215177 RECEIVED 26774 FEB 0 3 2016 FINAL AOGCC ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CD5-09 Definitive Survey Report 22 December, 2015 NAD 83 • • ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Project Western North Slope,North Slope Alaska,United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Well CD5-09 Well Position +N/-S 0.00 usft Northing: 5,965,618.27 usft Latitude: 70°18'48.698 N +E/-W 0.00 usft Easting: 1,489,418.53 usft Longitude: 151°13'25.842 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.20 usft Wellbore CD5-09 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (0) (°) (nT) BGG M2015 11/21/2015 17.91 80.83 57,471 Design CD5-09 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.69 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (0) 36.69 0.00 0.00 333.00 Survey Program Date 12/22/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description Survey Date 93.00 546.00 CD5-09 Srvy#1-SLB Free Gyro(CD5-0 GYD-GC-SS Gyrodata gyro single shots 11/30/2015 3:28 575.16 2,358.25 CD5-09 Srvy#2-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 11/30/2015 3:32 2,443.92 11,199.69 CD5-09 Srvy#3-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/1/2015 9:59: 11,293.71 13,220.19 CD5-09 Srvy#4-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/2/2015 1:34: 13,298.78 23,320.20 CD5-09 Srvy#5-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/14/2015 4:2f Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (0) (usft) (usft) (usft) (usft) (ft) (ft) (0/1001 (ft) Survey Tool Name 36.69 0.00 0.00 36.69 -34.20 0.00 0.00 5,965,618.27 1,489,418.53 0.00 0.00 UNDEFINED 93.00 0.30 41.78 93.00 22.11 0.11 0.10 5,965,618.38 1,489,418.63 0.53 0.05 GYD-GC-SS(1) 115.00 0.28 40.07 115.00 44.11 0.19 0.17 5,965,618.46 1,489,418.71 0.10 0.10 NOT an Actual Survey 20"x 42" _ _ .__, 183.00 0.22 32.85 183.00 112.11 0.430.35 5,965,618.69 1,489,418.89 0.10 0.23 GYD-GC-SS(1) 273.00 1.57 343.74 272.99 202.10 1.76 0.10 5,965,620.03 1,489,418.66 1.60 1.52 GYD-GC-SS(1) 363.00 2.65 345.79 362.92 292.03 4.96 -0.76 5,965,623.24 1,489,417.87 1.20 4.76 GYD-GC-SS(1) 453.00 3.55 348.56 452.79 381.90 9.71 -1.82 5,965,628.01 1,489,416.90 1.01 9.48 GYD-GC-SS(1) 546.00 4.37 347.26 545.57 474.68 15.99 -3.17 5,965,634.32 1,489,415.68 0.89 15.69 GYD-GC-SS(1) 575.16 4.57 347.71 574.64 503.75 18.21 -3.67 5,965,636.54 1,489,415.23 0.70 17.89 MWD+IFR-AK-CAZ-SC(2) 667.49 5.24 343.10 666.63 595.74 25.83 -5.68 5,965,644.21 1,489,413.38 0.84 25.59 MWD+IFR-AK-CAZ-SC(2) 12/22/2015 1:00:21PM Page 2 COMPASS 5000.1 Build 74 410 III ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 761.82 7.61 341.40 760.36 689.47 35.88 -8.92 5,965,654.32 1,489,410.33 2.52 36.02 MWD+IFR-AK-CAZ-SC(2) 855.88 9.51 338.57 853.37 782.48 49.01 -13.75 5,965,667.55 1,489,405.77 2.07 49.91 MWD+IFR-AK-CAZ-SC(2) 950.85 13.01 338.25 946.50 875.61 66.25 -20.58 5,965,684.92 1,489,399.29 3.69 68.37 MWD+IFR-AK-CAZ-SC(2) 1,044.77 16.40 339.54 1,037.33 966.44 88.50 -29.13 5,965,707.33 1,489,391.19 3.63 92.08 MWD+IFR-AK-CAZ-SC(2) 1,139.46 18.16 341.33 1,127.74 1,056.85 115.00 -38.53 5,965,734.02 1,489,382.33 1.94 119.96 MWD+IFR-AK-CAZ-SC(2) 1,233.57 18.96 342.10 1,216.96 1,146.07 143.45 -47.92 5,965,762.64 1,489,373.51 0.89 149.57 MWD+IFR-AK-CAZ-SC(2) 1,326.79 20.99 342.40 1,304.56 1,233.67 173.78 -57.63 5,965,793.16 1,489,364.41 2.18 181.00 MWD+IFR-AK-CAZ-SC(2) 1,421.88 22.77 343.03 1,392.80 1,321.91 207.61 -68.15 5,965,827.20 1,489,354.58 1.89 215.92 MWD+IFR-AK-CAZ-SC(2) 1,516.10 24.60 342.25 1,479.08 1,408.19 243.73 -79.45 5,965,863.53 1,489,344.00 1.97 253.24 MWD+IFR-AK-CAZ-SC(2) 1,610.74 27.97 342.23 1,563.92 1,493.03 283.64 -92.23 5,965,903.69 1,489,332.03 3.56 294.60 MWD+IFR-AK-CAZ-SC(2) 1,705.35 30.81 342.83 1,646.35 1,575.46 327.93 -106.16 5,965,948.24 1,489,319.00 3.02 340.38 MWD+IFR-AK-CAZ-SC(2) 1,800.52 33.84 346.05 1,726.77 1,655.88 376.94 -119.74 5,965,997.52 1,489,306.40 3.66 390.22 MWD+IFR-AK-CAZ-SC(2) 1,894.07 37.12 350.02 1,802.95 1,732.06 430.05 -130.92 5,966,050.83 1,489,296.29 4.28 442.61 MWD+IFR-AK-CAZ-SC(2) 1,988.05 40.33 354.02 1,876.27 1,805.38 488.25 -139.01 5,966,109.18 1,489,289.38 4.33 498.14 MWD+IFR-AK-CAZ-SC(2) 2,082.38 44.07 357.33 1,946.14 1,875.25 551.40 -143.72 5,966,172.41 1,489,285.94 4.61 556.55 MWD+IFR-AK-CAZ-SC(2) 2,176.00 47.52 358.08 2,011.41 1,940.52 618.45 -146.39 5,966,239.49 1,489,284.62 3.73 617.50 MWD+IFR-AK-CAZ-SC(2) 2,270.75 47.92 359.66 2,075.15 2,004.26 688.54 -147.77 5,966,309.59 1,489,284.65 1.30 680.58 MWD+IFR-AK-CAZ-SC(2) 2,358.25 46.62 1.35 2,134.53 2,063.64 752.80 -147.21 5,966,373.82 1,489,286.49 2.05 737.59 MWD+IFR-AK-CAZ-SC(2) 2,409 20 46.45 0 86 2 169 58 2 098.69 789 77 -146.50 5.966.410 77 1.489.287 95 0 77 770.20 r NOT an Actual Survey 10-3/4"x 13-112" 2,443.92 46.34 0.52 2.193.52 2,122.63 814.91 -146.20 5,966,435.90 1,489,288.76 0.77 792.47 MWD+IFR-AK-CAZ-SC(3) 2,456.69 46.74 1.20 2,202.31 2,131.42 824.18 -146.06 5,966,445.16 1,489,289.08 4.98 800.66 MWD+IFR-AK-CAZ-SC(3) 2,488.32 47.80 0.81 2,223.77 2,152.88 847.41 -145.65 5,966,468.38 1,489,289.96 3.47 821.18 MWD+IFR-AK-CAZ-SC(3) 2,551.10 49.99 359.58 2,265.04 2,194.15 894.71 -145.50 5,966,515.66 1,489,291.06 3.79 863.25 MWD+IFR-AK-CAZ-SC(3) 2,643.46 53.32 358.26 2,322.33 2,251.44 967.12 -146.89 5,966,588.08 1,489,291.13 3.78 928.40 MWD+IFR-AK-CAZ-SC(3) 2,737.16 57.51. 357.61 2,375.51 2,304.62 1,044.20 -149.68 5,966,665.19 1,489,289.89 4.51 998.34 MWD+IFR-AK-CAZ-SC(3) 2,831.88 60.66 358.06 2,424.17 2,353.28 1,125.39 -152.74 5,966,746.42 1,489,288.46 3.35 1,072.07 MWD+IFR-AK-CAZ-SC(3) 2,925.98 60.52 0.91 2,470.38 2,399.49 1,207.35 -153.48 5,966,828.37 1,489,289.37 2.64 1,145.43 MWD+IFR-AK-CAZ-SC(3) 3,019.61 60.10 359.96 2,516.76 2,445.87 1,288.68 -152.86 5,966,909.67 1,489,291.63 0.99 1,217.62 MWD+IFR-AK-CAZ-SC(3) 3,114.15 59.59 358.55 2,564.25 2,493.36 1,370.42 -153.92 5,966,991.41 1,489,292.21 1.40 1,290.93 MWD+IFR-AK-CAZ-SC(3) 3,208.43 59.75 355.89 2,611.87 2,540.98 1,451.69 -157.87 5,967,072.73 1,489,289.90 2.44 1,365.13 MWD+IFR-AK-CAZ-SC(3) 3,302.43 60.03 355.13 2,659.02 2,588.13 1,532.75 -164.23 5,967,153.90 1,489,285.16 0.76 1,440.25 MWD+IFR-AK-CAZ-SC(3) 3,396.61 59.84 354.76 2,706.21 2,635.32 1,613.94 -171.42 5,967,235.22 1,489,279.62 0.40 1,515.86 MWD+IFR-AK-CAZ-SC(3) 3,490.92 59.87 353.95 2,753.57 2,682.68 1,695.10 -179.44 5,967,316.51 1,489,273.23 0.74 1,591.81 MWD+IFR-AK-CAZ-SC(3) 3,585.56 60.19 353.72 2,800.85 2,729.96 1,776.61 -188.24 5,967,398.18 1,489,266.07 0.40 1,668.44 MWD+IFR-AK-CAZ-SC(3) 3,680.08 59.63 353.73 2,848.23 2,777.34 1,857.91 -197.18 5,967,479.63 1,489,258.76 0.59 1,744.93 MWD+IFR-AK-CAZ-SC(3) 3,774.51 59.91 355.19 2,895.78 2,824.89 1,939.11 -205.06 5,967,560.97 1,489,252.53 1.37 1,820.85 MWD+IFR-AK-CAZ-SC(3) 3,868.91 60.15 356.98 2,942.94 2,872.05 2,020.69 -210.64 5,967,642.64 1,489,248.59 1.66 1,896.08 MWD+IFR-AK-CAZ-SC(3) 3,963.57 59.81 357.93 2,990.30 2,919.41 2,102.57 -214.28 5,967,724.57 1,489,246.59 0.94 1,970.69 MWD+IFR-AK-CAZ-SC(3) 4,058.19 59.71 358.57 3,037.95 2,967.06 2,184.28 -216.77 5,967,806.30 1,489,245.74 0.59 2,044.62 MWD+IFR-AK-CAZ-SC(3) 12/22/2015 1:00:21PM Page 3 COMPASS 5000.1 Build 74 • i ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,152.26 59.72 0.59 3.085.40 3,014.51 2,265.50 -217.37 5,967,887.52 1,489,246.78 1.85 2,117.26 MWD+IFR-AK-CAZ-SC(3) 4,246.17 59.59 0.35 3,132.84 3,061.95 2,346.54 -216.71 5,967,968.52 1,489,249.07 0.26 2,189.17 MWD+IFR-AK-CAZ-SC(3) 4,340.80 59.03 0.28 3,181.14 3,110.25 2,427.92 -216.26 5,968,049.86 1,489,251.16 0.60 2,261.47 MWD+IFR-AK-CAZ-SC(3) 4,435.44 59.28 358.84 3,229.66 3,158.77 2,509.16 -216.88 5,968,131.10 1,489,252.17 1.33 2,334.15 MWD+IFR-AK-CAZ-SC(3) 4,529.43 59.59 358.11 3,277.46 3,206.57 2,590.07 -219.04 5,968,212.02 1,489,251.64 0.75 2,407.21 MWD+IFR-AK-CAZ-SC(3) 4,622.06 59.42 355.29 3,324.47 3,253.58 2,669.74 -223.63 5,968,291.77 1,489,248.65 2.63 2,480.28 MWD+IFR-AK-CAZ-SC(3) 4,716.11 59.28 356.29 3,372.42 3,301.53 2,750.43 -229.57 5,968,372.56 1,489,244.33 0.93 2,554.87 MWD+IFR-AK-CAZ-SC(3) 4,810.46 59.32 355.29 3,420.59 3,349.70 2,831.34 -235.53 5,968,453.56 1,489,240.01 0.91 2,629.66 MWD+IFR-AK-CAZ-SC(3) 4,905.03 59.36 354.93 3,468.81 3,397.92 2,912.39 -242.46 5,968,534.73 1,489,234.70 0.33 2,705.03 MWD+IFR-AK-CAZ-SC(3) 4,999.29 59.34 355.08 3,516.87 3,445.98 2,993.17 -249.52 5,968,615.63 1,489,229.27 0.14 2,780.22 MWD+IFR-AK-CAZ-SC(3) 5,093.96 59.62 354.90 3,564.94 3,494.05 3,074.41 -256.64 5,968,697.00 1,489,223.78 0.34 2,855.84 MWD+IFR-AK-CAZ-SC(3) 5,188.13 59.52 355.59 3,612.64 3,541.75 3,155.33 -263.37 5,968,778.03 1,489,218.68 0.64 2,930.99 MWD+IFR-AK-CAZ-SC(3) 5,282.42 59.31 357.02 3,660.62 3,589.73 3,236.33 -268.61 5,968,859.11 1,489,215.08 1.32 3,005.54 MWD+IFR-AK-CAZ-SC(3) 5,377.10 59.46 359.28 3,708.84 3,637.95 3,317.76 -271.24 5,968,940.57 1,489,214.09 2.06 3,079.29 MWD+IFR-AK-CAZ-SC(3) 5,470.97 59.24 0.38 3,756.70 3,685.81 3,398.52 -271.48 5,969,021.31 1,489,215.47 1.04 3,151.35 MWD+IFR-AK-CAZ-SC(3) 5,565.44 59.54 0.40 .3,804.80 3,733.91 3,479.82 -270.92 5,969,102.58 1,489,217.66 0.32 3,223.54 MWD+IFR-AK-CAZ-SC(3) 5,659.72 59.66 359.08 3,852.51 3,781,62 3,561.14 -271.29 5,969,183.88 1,489,218.93 1.21 3,296.16 MWD+IFR-AK-CAZ-SC(3) 5,754.75 59,59 358,71 3,900.56 3,829.67 3,643.11 -272.87 5,969,265.86 1,489,218.99 0.34 3,369.91 MWD+IFR-AK-CAZ-SC(3) 5,848.76 59.38 358.40 3,948.30 3,877.41 3,724.07 -274.91 5,969,346.84 1,489,218,58 0.36 3,442.98 MWD+IFR-AK-CAZ-SC(3) 5,942.57 59.38 358.06 3,996.08 3,925.19 3,804.76 -277.41 5,969,427.56 1,489,217.71 0.31 3,516.01 MWD+IFR-AK-CAZ-SC(3) 6,036.94 59.42 357.86 4,044.12 3,973.23 3,885.94 -280.30 5,969,508.77 1,489,216.45 0.19 3,589.65 MWD+IFR-AK-CAZ-SC(3) 6,130.78 59.48 358.43 4,091.82 4,020.93 3,966.71 -282.92 5,969,589.57 1,489,215.46 0.53 3,662.80 MWD+IFR-AK-CAZ-SC(3) 6,222.88 59.55 358.52 4,138.54 4,067.65 4,046.05 -285.03 5,969,668.93 1,489,214.94 0.11 3,734.46 MWD+IFR-AK-CAZ-SC(3) 6,316.99 59.51 359.12 4,186.26 4,115.37 4,127.14 -286.70 5,969,750.04 1,489,214.91 0.55 3,807.47 MWD+IFR-AK-CAZ-SC(3) 6,412.03 59.76 359.47 4,234.31 4,163.42 4,209.14 -287.71 5,969,832.03 1,489,215.55 0.41 3,880.99 MWD+IFR-AK-CAZ-SC(3) 6,504.42 59.28 359.64 4,281.17 4,210.28 4,288.76 -288.33 5,969,911.64 1,489,216.53 0.54 3,952.21 MWD+IFR-AK-CAZ-SC(3) 6,600.13 59.28 359.10 4,330.06 4,259.17 4,371.03 -289.23 5,969,993.91 1,489,217.28 0.49 4,025.93 MWD+IFR-AK-CAZ-SC(3) 6,693.94 59.25 358.96 4,378.00 4,307.11 4,451.66 -290.60 5,970,074.54 1,489,217.54 0.13 4,098.38 MWD+IFR-AK-CAZ-SC(3) 6,787.89 59.47 358.15 4,425.89 4,355.00 4,532.46 -292.63 5,970,155.36 1,489,217.12 0.78 4,171.31 MWD+IFR-AK-CAZ-SC(3) 6,881.78 59.30 357.58 4,473.70 4,402.81 4,613.21 -295.64 5,970,236.15 1,489,215.74 0.55 4,244.62 MWD+IFR-AK-CAZ-SC(3) 6,977.05 59.49 357.20 4,522,21 4,451.32 4,695.12 -299.38 5,970,318.11 1,489,213.65 0.40 4,319.30 MWD+IFR-AK-CAZ-SC(3) 7,071.32 59.42 357.15 4,570.11 4,499.22 4,776.21 -303.38 5,970,399.26 1,489,211.28 0.09 4,393.37 MWD+IFR-AK-CAZ-SC(3) 7,165.10 59.37 356.86 4,617.86 4,546.97 4,856.82 -307.60 5,970,479.93 1,489,208.69 0.27 4,467.10 MWD+IFR-AK-CAZ-SC(3) 7,258.90 59.25 357.21 4,665.73 4,594.84 4,937.37 -311.77 5,970,560.55 1,489,206.13 0.35 4,540.77 MWD+IFR-AK-CAZ-SC(3) 7,353.35 59.31 357.45 4,713.98 4,643.09 5,018.48 -315.55 5,970,641.71 1,489,203.98 0.23 4,614.75 MWD+IFR-AK-CAZ-SC(3) 7,445.60 59.31 358.27 4,761.07 4,690.18 5,097.75 -318.51 5,970,721.02 1,489,202.62 0,76 4,686.73 MWD+IFR-AK-CAZ-SC(3) 7,541.44 59.69 358.29 4,809.71 4,738.82 5,180.29 -320.99 5,970,803.59 1,489,201.80 0.40 4,761.40 MWD+IFR-AK-CAZ-SC(3) 7,635.23 59.76 0.03 4,857.00 4,786.11 5,261.28 -322.18 5,970,884.57 1,489,202.24 1.60 4,834.10 MWD+IFR-AK-CAZ-SC(3) 7,728.10 59.50 1.38 4,903.95 4,833.06 5,341.40 -321.20 5,970,964.65 1,489,204.84 1.29 4,905.04 MWD+IFR-AK-CAZ-SC(3) 7,822.87 59.66 1.36 4,951.94 4,881.05 5,423.10 -319.24 5,971,046.29 1,489,208.43 0.17 4,976.95 MWD+IFR-AK-CAZ-SC(3) 12/22/2015 1:00:21PM Page 4 COMPASS 5000.1 Build 74 • i ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,917.89 59.59 1.42 4,999.99 4,929.10 5,505.05 -317.25 5,971,128.18 1,489,212.07 0.09 5,049.06 MWD+IFR-AK-CAZ-SC(3) 8,012.40 59.68 0.71 5,047.76 4,976.87 5,586.58 -315.74 5,971,209.65 1,489,215.22 0.66 5,121.02 MWD+IFR-AK-CAZ-SC(3) 8,106.78 59.76 359.26 5,095.35 5,024.46 5,668.08 -315.76 5,971,291.13 1,489,216.84 1.33 5,193.65 MWD+IFR-AK-CAZ-SC(3) 8,201.35 59.65 357.95 5,143.06 5,072.17 5,749.71 -317.75 5,971,372.78 1,489,216.50 1.20 5,267.28 MWD+IFR-AK-CAZ-SC(3) 8,295.22 59.20 356.36 5,190.81 5,119.92 5,830.42 -321.75 5,971,453.55 1,489,214.11 1.54 5,341.02 MWD+IFR-AK-CAZ-SC(3) 8,389.19 59.04 355.22 5,239.04 5,168.15 5,910.85 -327.67 5,971,534.08 1,489,209.81 1.06 5,415.37 MWD+IFR-AK-CAZ-SC(3) 8,483.13 59.33 356.09 5,287.16 5,216.27 5,991.30 -333.79 5,971,614.62 1,489,205.32 0.85 5,489.82 MWD+IFR-AK-CAZ-SC(3) 8,574.31 59.32 356.78 5,333.68 5,262.79 6,069.57 -338.66 5,971,692.97 1,489,202.02 0.65 5,561.77 MWD+IFR-AK-CAZ-SC(3) 8,670.31 59.12 356.56 5,382.81 5,311.92 6,151.91 -343.45 5,971,775.38 1,489,198.88 0.29 5,637.31 MWD+IFR-AK-CAZ-SC(3) 8,764.04 59.12 356.74 5,430.92 5,360.03 6,232.21 -348.15 5,971,855.76 1,489,195.80 0.16 5,711.00 MWD+IFR-AK-CAZ-SC(3) 8,856.91 59.54 357.07 5,478.29 5,407.40 6,311.97 -352.47 5,971,935.59 1,489,193.09 0.55 5,784.03 MWD+IFR-AK-CAZ-SC(3) 8,950.90 59.28 358.70 5,526.12 5,455.23 6,392.82 -355.45 5,972,016.47 1,489,191.73 1.52 5,857.42 MWD+IFR-AK-CAZ-SC(3) 9,043.29 59.25 357.92 5,573.34 5,502.45 6,472.20 -357.80 5,972,095.88 1,489,190.99 0.73 5,929.21 MWD+IFR-AK-CAZ-SC(3) 9,136.93 59.47 357.31 5,621.06 5,550.17 6,552.70 -361.15 5,972,176.42 1,489,189.25 0.61 6,002.45 MWD+IFR-AK-CAZ-SC(3) 9,231.04 59.32 357.11 5,668.97 5,598.08 6,633.60 -365.09 5,972,257.38 1,489,186.94 0.24 6,076.33 MWD+IFR-AK-CAZ-SC(3) 9,284.51 59.28 357.14 5,696.28 5,625.39 6,679.52 -367.40 5,972,303.34 1,489 185 56 0.09 6,118.29 MWD+IFR-AK-CAZ-SC(3) CD5-09 BoundingPolygon 072715 BP 9,325.98 59.25 357.17 5,717.47 5,646.58 6,715.12 -369.16 5,972,338.96 1,489,184.51 0.09 6,150.81 MWD+IFR-AK-CAZ-SC(3) 9,418.71 59.53 358.00 5,764.68 5,693.79 6,794.86 -372.53 5,972,418.74 1,489,182.75 0.83 6,223.39 MWD+IFR-AK-CAZ-SC(3) 9,512.39 59.48 359.56 5,812.23 5,741.34 6,875.56 -374.24 5,972,499.45 1,489,182.65 1.44 6,296.07 MWD+IFR-AK-CAZ-SC(3) 9,607.42 59.53 359.06 5,860.45 5,789.56 6,957.44 -375.23 5,972,581.33 1,489,183.31 0.46 6,369.47 MWD+IFR-AK-CAZ-SC(3) 9,701.39 59.56 358.72 5,908.08 5,837.19 7,038.42 -376.80 5,972,662.33 1,489,183.37 0.31 6,442.35 MWD+IFR-AK-CAZ-SC(3) 9,794.77 59.38 358.89 5,955.52 5,884.63 7,118.84 -378.48 5,972,742.76 1,489,183.31 0.25 6,514.76 MWD+IFR-AK-CAZ-SC(3) 9,889.44 59.56 358.63 6,003.61 5,932.72 7,200.37 -380.24 5,972,824.29 1,489,183.19 0.30 6,588.20 MWD+IFR-AK-CAZ-SC(3) 9,983.12 59.42 358.59 6,051.17 5,980.28 7,281.05 -382.20 5,972,905.00 1,489,182.85 0.15 6,660.98 MWD+IFR-AK-CAZ-SC(3) 10,076.68 59.46 358.60 6,098.74 6,027.85 7,361.59 -384.18 5,972,985.55 1,489,182.50 0.04 6,733.64 MWD+IFR-AK-CAZ-SC(3) 10,170.22 59.53 357.96 6,146.22 6,075.33 7,442.15 -386.59 5,973,066.14 1,489,181.70 0.59 6,806.51 MWD+IFR-AK-CAZ-SC(3) 10,264.10 59.38 358.31 6,193.93 6,123.04 7,522.96 -389.23 5,973,146.98 1,489,180.69 0.36 6,879.71 MWD+IFR-AK-CAZ-SC(3) 10,357.91 59.46 357.60 6,241.66 6,170.77 7,603.67 -392.11 5,973,227.72 1,489,179.44 0.66 6,952.93 MWD+IFR-AK-CAZ-SC(3) 10,451.19 59.49 357.37 6,289.04 6,218.15 7,683.94 -395.63 5,973,308.05 1,489,177.53 0.21 7,026.06 MWD+IFR-AK-CAZ-SC(3) 10,545.42 59.39 356.87 6,336.95 6,266.06 7,764.98 -399.71 5,973,389.14 1,489,175.08 0.47 7,100.11 MWD+IFR-AK-CAZ-SC(3) 10,638.42 59.45 355.38 6,384.26 6,313.37 7,844.86 -405.12 5,973,469.11 1,489,171.28 1.38 7,173.74 MWD+IFR-AK-CAZ-SC(3) 10,732.21 59.45 355.16 6,431.93 6,361.04 7,925.36 -411.78 5,973,549.72 1,489,166.24 0.20 7,248.49 MWD+IFR-AK-CAZ-SC(3) 10,824.67 59.53 355.79 6,478.87 6,407.98 8,004.76 -418.07 5,973,629.23 1,489,161.55 0.59 7,322.10 MWD+IFR-AK-CAZ-SC(3) 10,918.44 59.34 356.53 6,526.56 6,455.67 8,085.32 -423.47 5,973,709.88 1,489,157.76 0.71 7,396.33 MWD+IFR-AK-CAZ-SC(3) 11,012.71 59.60 356.47 6,574.45 6,503.56 8,166.37 -428.43 5,973,791.00 1,489,154.44 0.28 7,470.80 MWD+IFR-AK-CAZ-SC(3) 11,105.90 59.50 357.79 6,621.68 6,550.79 8,246.61 -432.45 5,973,871.29 1,489,152.03 1.23 7,544.11 MWD+IFR-AK-CAZ-SC(3) 11,199.69 59.33 358.09 6,669.40 6,598.51 8,327.29 -435.36 5,973,952.02 1,489,150.75 0.33 7,617.32 MWD+IFR-AK-CAZ-SC(3) 11,293.71 59.18 358.96 6,717.46 6,646.57 8,408.07 -437.44 5,974,032.82 1,489,150.30 0.81 7,690.24 MWD+IFR-AK-CAZ-SC(4) 11,385.70 59.40 359.15 6,764.44 6,693.55 8,487.15 -438.74 5,974,111.90 1,489,150.58 0.30 7,761.29 MWD+IFR-AK-CAZ-SC(4) 12/22/2015 1:00:21PM Page 5 COMPASS 5000.1 Build 74 • • ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,479.40 59.44 358.56 6,812.11 6,741.22 8,567.80 -440.35 5,974,192.56 1,489,150.59 0.54 7,833.88 MWD+IFR-AK-CAZ-SC(4) 11,573.11 59.33 358.03 6,859.83 6,788.94 8,648.41 -442.75 5,974,273.20 1,489,149.81 0.50 7,906.80 MWD+IFR-AK-CAZ-SC(4) 11,666.63 59.48 358.17 6,907.43 6,836.54 8,728.87 -445.42 5,974,353.69 1,489,148.76 0.21 7,979.70 MWD+IFR-AK-CAZ-SC(4) 11,760.65 59.40 357.62 6,955.24 6,884.35 8,809.78 -448.40 5,974,434.63 1,489,147.42 0.51 8,053.14 MWD+IFR-AK-CAZ-SC(4) 11,853.82 59.40 356.06 7,002.67 6,931.78 8,889.85 -452.82 5,974,514.77 1,489,144.61 1.44 8,126.48 MWD+IFR-AK-CAZ-SC(4) 11,948.30 59.40 355.80 7,050.76 6,979.87 8,970.96 -458.59 5,974,595.98 1,489,140.47 0.24 8,201.38 MWD+IFR-AK-CAZ-SC(4) 12,041.39 59.44 354.66 7,098.12 7,027.23 9,050.83 -465.25 5,974,675.95 1,489,135.41 1.06 8,275.57 MWD+IFR-AK-CAZ-SC(4) 12,135.10 61.27 352.50 7,144.47 7,073.58 9,131.75 -474.37 5,974,757.03 1,489,127.92 2.80 8,351.81 MWD+IFR-AK-CAZ-SC(4) 12,227.99 63.06 349.58 7,187.85 7,116.96 9,212.87 -487.18 5,974,838.39 1,489,116.75 3.38 8,429.90 MWD+IFR-AK-CAZ-SC(4) 12,322.50 66.73 347.53 7,227.95 7,157.06 9,296.72 -504.18 5,974,922.56 1,489,101.44 4.35 8,512.33 MWD+IFR-AK-CAZ-SC(4) 12,415.42 69.47 345.52 7,262.61 7,191.72 9,380.55 -524.28 5,975,006.77 1,489,083.03 3.57 8,596.15 MWD+IFR-AK-CAZ-SC(4) 12,509.35 72.28 345.26 7,293.38 7,222.49 9,466.42 -546.66 5,975,093.06 1,489,062.38 3.00 8,682.82 MWD+IFR-AK-CAZ-SC(4) 12,603.05 73.78 344.48 7,320.72 7,249.83 9,552.93 -570.06 5,975,180.02 1,489,040.73 1.79 8,770.52 MWD+IFR-AK-CAZ-SC(4) 12,696.90 76.53 342.64 7,344.77 7,273.88 9,639.92 -595.74 5,975,267.50 1,489,016.81 3.49 8,859.69 MWD+IFR-AK-CAZ-SC(4) 12,790.82 78.06 341.04 7,365.43 7,294.54 9,726.97 -624.29 5,975,355.10 1,488,990.01 2.33 8,950.22 MWD+IFR-AK-CAZ-SC(4) 12,884.76 80.25 339.37 7,383.10 7,312.21 9,813.77 -655.54 5,975,442.51 1,488,960.52 2.91 9,041.74 MWD+IFR-AK-CAZ-SC(4) 12,978.58 83.93 338.06 7,396.01 7,325.12 9,900.34 -689.27 5,975,529.73 1,488,928.54 4.16 9,134.19 MWD+IFR-AK-CAZ-SC(4) 13,072.13 85.92 336.14 7,404.29 7,333.40 9,986.17 -725.53 5,975,616.27 1,488,894.02 2.95 9,227.13 MWD+IFR-AK-CAZ-SC(4) 13,093.26 85.90 335.19 7,405.79 7,334.90 10,005.38 -734.22 5,975,635.65 1,488,885.72 4.49 9,248.18 MWD+IFR-AK-CAZ-SC(4) CD5-09 01.Hee1 071615 JB-CD5-09 01.Heel 071615 JB_Circle 13,165.31 85.82 331.95 7,411.00 7,340.11 10,069.71 -766.20 5,975.700.61 1.488,855.04 4.49 9,320.C3 MWD+IFR-AK-CAZ-SC(4) 13,220.19 85.57 330.70 7,415.12 7,344.23 10,117.73 -792.46 5,975,749.14 1,488,829.76 2.32 9,374.73 MWD+IFR-AK-CAZ-SC(4) 13,271.70 87.07 331.40 7,418.43 7.347.54 10,162.70 -817.34 5.975.794.60 1.488 805 78 3.21 9,426.10 NOT an Actual Survey • •• 7-5/8"x 9-7/8"x11" 13,298.78 87.86 331.76 7,419.62 7,348.73 10,186.50 -830.21 5,975,818.65 1,488,793.39 3.21 9,453.14 MWD+IFR-AK-CAZ-SC(5) 13,393.40 90.35 332.27 7,421.10 7,350.21 10,270.04 -874.61 5,975,903.06 1,488,750.69 2.69 9,547.73 MWD+IFR-AK-CAZ-SC(5) 13,488.75 89.81 330.97 7,420.97 7,350.08 10,353.92 -919.93 5,975,987.83 1,488,707.07 1.48 9,643.05 MWD+IFR-AK-CAZ-SC(5) 13,584.28 91.18 331.92 7,420.14 7,349.25 10,437.83 -965.59 5,976,072.63 1,488,663.11 1.75 9,738.54 MWD+IFR-AK-CAZ-SC(5) 13,679.30 90.43 329.89 7,418.81 7,347.92 10,520.84 -1,011.78 5,976,156.55 1,488,618.60 2.28 9,833.48 MWD+IFR-AK-CAZ-SC(5) 13,777.18 90.85 329.21 7,417.71 7,346.82 10,605.22 -1,061.38 5,976,241.90 1,488,570.71 0.82 9,931.18 MWD+IFR-AK-CAZ-SC(5) 13,869.81 91.79 329.18 7,415.58 7,344.69 10,684.76 -1,108.81 5,976,322.37 1,488,524.89 1.02 10,023.58 MWD+IFR-AK-CAZ-SC(5) 13,965.43 91.29 328.72 7,413.01 7,342.12 10,766.65 -1,158.11 5,976,405.23 1,488,477.25 0.71 10,118.92 MWD+IFR-AK-CAZ-SC(5) 14,057.34 90.71 329.01 7,411.41 7,340.52 10,845.30 -1,205.62 5,976,484.82 1,488,431.33 0.71 10,210.58 MWD+IFR-AK-CAZ-SC(5) 14,149.46 90.16 330.80 7,410.71 7,339.82 10,925.00 -1,251.81 5,976,565.42 1,488,386.76 2.03 '10,302.56 MWD+IFR-AK-CAZ-SC(5) 14,241.29 89.92 331.02 7,410.64 7,339.75 11,005.25 -1,296.46 5,976,646.55 1,488,343.74 0.35 10,394.33 MWD+IFR-AK-CAZ-SC(5) 14,333.64 90.30 333.76 7,410.47 7,339.58 11,087.07 -1,339.25 5,976,729.21 1,488,302.60 3.00 10,486.66 MWD+IFR-AK-CAZ-SC(5) 14,424.32 90.43 333.85 7,409.89 7,339.00 11,168.44 -1,379.28 5,976,811.36 1,488,264.22 0.17 10,577.33 MWD+IFR-AK-CAZ-SC(5) 14,515.06 90.85 334.74 7,408.87 7,337.98 11,250.19 -1,418.64 5,976,893.88 1,488,226.52 1.08 10,668.04 MWD+IFR-AK-CAZ-SC(5) 14,605.92 90.78 334.03 7,407.58 7,336.69 11,332.11 -1,457.91 5,976,976.57 1,488,188.90 0.79 10,758.87 MWD+IFR-AK-CAZ-SC(5) 14,701.10 91.51 335.49 7,405.68 7,334.79 11,418.19 -1,498.49 5,977,063.43 1,488,150.07 1.71 10,853.98 MWD+IFR-AK-CAZ-SC(5) 12122/2015 1:00:21PM Page 6 COMPASS 5000.1 Build 74 110 • ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD WDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°I100') (ft) Survey Tool Name 14,789.32 91.19 335.48 7,403.60 7,332.71 11,498.43 -1,535.09 5,977,144.39 1,488,115.10 0.36 10,942.00 MWD+IFR-AK-CAZ-SC(5) 14,880.97 91.22 335.35 7,401.67 7,330.78 11,581.75 -1,573.21 5,977,228.46 1,488,078.66 0.15 11,033.64 MWD+IFR-AK-CAZ-SC(5) 14,972.22 91.33 335.42 7,399.64 7,328.75 11,664.69 -1,611.20 5,977,312.14 1,488,042.34 0.14 11,124.79 MWD+IFR-AK-CAZ-SC(5) 15,064.37 91.36 335.52 7,397.48 7,326.59 11,748.50 -1,649.45 5,977,396.69 1,488,005.79 0.11 11,216.83 MWD+IFR-AK-CAZ-SC(5) 15,156.79 91.29 334.56 7,395.34 7,324.45 11,832.27 -1,688.44 5,977,481.22 1,487,968.50 1.04 11,309.16 MWD+IFR-AK-CAZ-SC(5) 15,248.43 91.09 333.48 7,393.44 7,322.55 11,914.63 -1,728.58 5,977,564.36 1,487,930.03 1.20 11,400.77 MWD+IFR-AK-CAZ-SC(5) 15,339.45 90.09 333.27 7,392.50 7,321.61 11,995.99 -1,769.36 5,977,646.52 1,487,890.89 1.12 11,491.78 MWD+IFR-AK-CAZ-SC(5) 15,431.64 90.38 332.92 7,392.13 7,321.24 12,078.20 -1,811.08 5,977,729.55 1,487,850.84 0.49 11,583.97 MWD+IFR-AK-CAZ-SC(5) 15,524.08 89.34 332.63 7,392.35 7,321.46 12,160.40 -1,853.37 5,977,812.58 1,487,810.21 1.17 11,676.40 MWD+IFR-AK-CAZ-SC(5) 15,615.02 89.41 332.43 7,393.34 7,322.45 12,241.08 -1,895.32 5,977,894.08 1,487,769.90 0.23 11,767.34 MWD+IFR-AK-CAZ-SC(5) 15,706.48 88.72 332.25 7,394.84 7,323.95 12,322.07 -1,937.77 5,977,975.91 1,487,729.09 0.78 11,858.78 MWD+IFR-AK-CAZ-SC(5) 15,798.23 88.86 332.68 7,396.77 7,325.88 12,403.41 -1,980.17 5,978,058.08 1,487,688.33 0.49 11,950.50 MWD+IFR-AK-CAZ-SC(5) 15,889.68 88.86 332.60 7,398.59 7,327.70 12,484.62 -2,022.19 5,978,140.10 1,487,647.95 0.09 12,041.93 MWD+IFR-AK-CAZ-SC(5) 15,982.04 88.14 330.98 7,401.01 7,330.12 12,565.98 -2,065.84 5,978,222.32 1,487,605.96 1.92 12,134.24 MWD+IFR-AK-CAZ-SC(5) 16,074.47 88.24 330.61 7,403.93 7,333.04 12,646.62 -2,110.91 5,978,303.84 1,487,562.52 0.41 12,226.55 MWD+IFR-AK-CAZ-SC(5) 16,169.87 88.14 331.37 7,406.94 7,336.05 12,730.00 -2,157.16 5,978,388.14 1,487,517.96 0.80 12,321.85 MWD+IFR-AK-CAZ-SC(5) 16,265.04 87.83 331.29 7,410.29 7,339.40 12,813.45 -2,202.79 5,978,472.48 1,487,474.02 0.34 12,416.92 MWD+IFR-AK-CAZ-SC(5) 16,361.06 88.72 331.21 7,413.18 7,342.29 12,897.60 -2,248.95 5,978,557.53 1,487,429.57 0.93 12,512.85 MWD+IFR-AK-CAZ-SC(5) 16,455.21 89.93 332.11 7,414.29 7,343.40 12,980.46 -2,293.64 5,978,641.26 1,487,386.56 1.60 12,606.96 MWD+IFR-AK-CAZ-SC(5) 16,550.50 90.20 332.21 7,414.18 7,343.29 13,064.72 -2,338.14 5,978,726.40 1,487,343.76 0.30 12,702.24 MWD+IFR-AK-CAZ-SC(5) 16,645.74 90.64 332.31 7,413.48 7,342.59 13,149.01 -2,382.47 5,978,811.56 1,487,301.14 0.47 12,797.47 MWD+IFR-AK-CAZ-SC(5) 16,741.50 92.38 333.71 7,410.96 7,340.07 13,234.30 -2,425.91 5,978,897.70 1,487,259.43 2.33 12,893.19 MWD+IFR-AK-CAZ-SC(5) 16,836.02 92.29 332.19 7,407.11 7,336.22 13,318.41 -2,468.86 5,978,982.65 1,487,218.18 1.61 12,987.63 MWD+IFR-AK-CAZ-SC(5) 16,932.04 93.90 331.99 7,401.92 7,331.03 13,403.14 -2,513.74 5,979,068.25 1,487,175.02 1.69 13,083.49 MWD+IFR-AK-CAZ-SC(5) 17,027.38 95.12 332.97 7,394.43 7,323.54 13,487.42 -2,557.65 5,979,153.40 1,487,132.81 1.64 13,178.53 MWD+IFR-AK-CAZ-SC(5) 17,122.26 95.16 332.89 7,385.93 7,315.04 13,571.57 -2,600.66 5,979,238.39 1,487,091.51 0.09 13,273.03 MWD+IFR-AK-CAZ-SC(5) 17,217.31 92.94 333.09 7,379.21 7,308.32 13,656.04 -2,643.71 5,979,323.70 1,487,050.17 2.35 13,367.84 MWD+IFR-AK-CAZ-SC(5) 17,312.84 89.76 329.64 7,376.96 7,306.07 13,739.83 -2,689.47 5,979,408.39 1,487,006.11 4.91 13,463.28 MWD+IFR-AK-CAZ-SC(5) 17,408.01 89.75 329.23 7,377.37 7,306.48 13,821.78 -2,737.86 5,979,491.29 1,486,959.37 0.43 13,558.26 MWD+IFR-AK-CAZ-SC(5) 17,504.06 89.23 328.70 7,378.22 7,307.33 13,904.08 -2,787.38 5,979,574.56 1,486,911.52 0.77 13,654.07 MWD+IFR-AK-CAZ-SC(5) 17,598.25 88.37 329.38 7,380.20 7,309.31 13,984.83 -2,835.82 5,979,656.26 1,486,864.72 1.16 13,748.01 MWD+IFR-AK-CAZ-SC(5) 17,693.83 89.28 330.05 7,382.16 7,311.27 14,067.35 -2,884.01 5,979,739.72 1,486,818.20 1.18 13,843.41 MWD+IFR-AK-CAZ-SC(5) 17,789.50 89.13 330.46 7,383.48 7,312.59 14,150.40 -2,931.48 5,979,823.71 1,486,772.42 0.46 13,938.96 MWD+IFR-AK-CAZ-SC(5) 17,884.87 90.53 332.56 7,383.77 7,312.88 14,234.22 -2,976.96 5,979,908.42 1,486,728.63 2.65 14,034.29 MWD+IFR-AK-CAZ-SC(5) 17,979.94 89.66 332.25 7,383.61 7,312.72 14,318.47 -3,021.00 5,979,993.53 1,486,686.30 0.97 14,129.36 MWD+IFR-AK-CAZ-SC(5) 18,075.99 87.65 333.01 7,385.86 7,314.97 14,403.74 -3,065.14 5,980,079.67 1,486,643.88 2.24 14,225.37 MWD+IFR-AK-CAZ-SC(5) 18,170.94 87.49 334.72 7,389.89 7,319.00 14,488.90 -3,106.93 5,980,165.65 1,486,603.82 1.81 14,320.22 MWD+IFR-AK-CAZ-SC(5) 18,266.27 88.17 337.41 7,393.50 7,322.61 14,575.96 -3,145.57 5,980,253.46 1,486,566.94 2.91 14,415.34 MWD+IFR-AK-CAZ-SC(5) 18,360.74 88.65 338.94 7,396.12 7,325.23 14,663.63 -3,180.68 5,980,341.80 1,486,533.61 1.70 14,509.38 MWD+IFR-AK-CAZ-SC(5) 18,456.23 89.20 338.12 7,397.91 7,327.02 14,752.47 -3,215.62 5,980,431.33 1,486,500.46 1.03 14,604.41 MWD+IFR-AK-CAZ-SC(5) 12/22/2015 1:00:21PM Page 7 COMPASS 5000.1 Build 74 • 0 ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +EI-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) (0/100) (ft) Survey Tool Name 18,552.27 90.42 336.82 7,398.23 7,327.34 14,841.18 -3,252.42 5,980,520.75 1,486,465.46 1.86 14,700.15 MWD+IFR-AK-CAZ-SC(5) 18,646.08 93.90 335.53 7,394.70 7,323.81 14,926.92 -3,290.28 5,980,607.23 1,486,429.33 3.96 14,793.74 MWD+IFR-AK-CAZ-SC(5) 18,740.95 93.60 334.92 7,388.49 7,317.60 15,012.87 -3,329.95 5,980,693.96 1,486,391.40 0.72 14,888.33 MWD+IFR-AK-CAZ-SC(5) 18,837.09 92.29 332.55 7,383.55 7,312.66 15,098.96 -3,372.44 5,980,780.88 1,486,350.66 2.81 14,984.33 MWD+IFR-AK-CAZ-SC(5) 18,933.03 91.36 330.15 7,380.50 7,309.61 15,183.11 -3,418.41 5,980,865.92 1,486,306.39 2.68 15,080.17 MWD+IFR-AK-CAZ-SC(5) 19,028.35 91.94 329.26 7,377.75 7,306.86 15,265.37 -3,466.47 5,980,949.14 1,486,259.99 1.11 15,175.29 MWD+IFR-AK-CAZ-SC(5) 19,122.76 92.53 329.67 7,374.07 7,303.18 15,346.63 -3,514.40 5,981,031.33 1,486,213.71 0.76 15,269.45 MWD+IFR-AK-CAZ-SC(5) 19,217.93 92.94 328.77 7,369.53 7,298.64 15,428.30 -3,563.05 5,981,113.96 1,486,166.72 1.04 15,364.31 MWD+IFR-AK-CAZ-SC(5) 19,313.93 93.14 328.50 7,364.44 7,293.55 15,510.16 -3,612.94 5,981,196.79 1,486,118.48 0.35 15,459.89 MWD+IFR-AK-CAZ-SC(5) 19,408.98 93.42 328.40 7,359.00 7,288.11 15,591.02 -3,662.60 5,981,278.64 1,486,070.47 0.31 15,554.49 MWD+IFR-AK-CAZ-SC(5) 19,504.33 93.43 329.24 7,353.30 7,282.41 15,672.45 -3,711.87 5,981,361.04 1,486,022.85 0.88 15,649.41 MWD+IFR-AK-CAZ-SC(5) 19,600.30 92.36 328.92 7,348.46 7,277.57 15,754.68 -3,761.12 5,981,444.23 1,485,975.26 1.16 15,745.04 MWD+IFR-AK-CAZ-SC(5) 19,694.83 91.12 330.22 7,345.59 7,274.70 15,836.15 -3,808.98 5,981,526.64 1,485,929.06 1.90 15,839.35 MWD+IFR-AK-CAZ-SC(5) 19,790.10 90.79 331.85 7,344.00 7,273.11 15,919.48 -3,855.11 5,981,610.88 1,485,884.62 1.75 15,934.55 MWD+IFR-AK-CAZ-SC(5) 19,885.46 89.37 332.50 7,343.86 7,272.97 16,003.82 -3,899.62 5,981,696.08 1,485,841.82 1.64 16,029.89 MWD+IFR-AK-CAZ-SC(5) 19,981.63 88.79 332.87 7,345.41 7,274.52 16,089.25 -3,943.74 5,981,782.38 1,485,799.43 0.72 16,126.05 MWD+IFR-AK-CAZ-SC(5) 20,076.59 88.27 333.24 7,347.84 7,276.95 16,173.87 -3,986.76 5,981,867.85 1,485,758.12 0.67 16,220.98 MWD+IFR-AK-CAZ-SC(5) 20,172.24 89.10 333.02 7,350.04 7,279.15 16,259.17 -4,029.98 5,981,953.99 1,485,716.63 0.90 16,316.60 MWD+IFR-AK-CAZ-SC(5) 20,266.72 89.58 333.67 7,351.13 7,280.24 16,343.61 -4,072.36 5,982,039.25 1,485,675.96 0.86 16,411.07 MWD+IFR-AK-CAZ-SC(5) 20,359.74 89.41 333.12 7,351.94 7,281.05 16,426.77 -4,114.02 5,982,123.23 1,485,635.98 0.62 16,504.08 MWD+IFR-AK-CAZ-SC(5) CD5-09 02.Toe 071615 JB 20,362.43 89.41 333.10 7,351.97 7,281.08 16,429.17 -4,115.23 5,982,125.66 1,485,634.82 0.62 16,506.78 MWD+IFR-AK-CAZ-SC(5) 20,457.39 89.48 332.21 7,352.89 7,282.00 16,513.51 -4,158.85 5,982,210.85 1,485,592.91 0.94 16,601.73 MWD+IFR-AK-CAZ-SC(5) 20,552.74 89.68 332.02 7,353.59 7,282.70 16,597.79 -4,203.44 5,982,296.00 1,485,550.02 0.29 16,697.06 MWD+IFR-AK-CAZ-SC(5) 20,648.27 89.97 331.72 7,353.88 7,282.99 16,682.04 -4,248.48 5,982,381.13 1,485,506.69 0.44 16,792.57 MWD+IFR-AK-CAZ-SC(5) 20,743.09 89.30 330.89 7,354.49 7,283.60 16,765.21 -4,294.01 5,982,465.20 1,485,462.85 1.12 16,887.35 MWD+IFR-AK-CAZ-SC(5) 20,839.11 89.68 328.91 7,355.34 7,284.45 16,848.27 -4,342.16 5,982,549.21 1,485,416.38 2.10 16,983.22 MWD+IFR-AK-CAZ-SC(5) 20,932.92 89.37 327.28 7,356.12 7,285.23 16,927.91 -4,391.74 5,982,629.81 1,485,368.42 1.77 17,076.68 MWD+IFR-AK-CAZ-SC(5) 21,028.98 89.92 327.40 7,356.71 7,285.82 17,008.78 -4,443.57 5,982,711.70 1,485,318.22 0.59 17,172.27 MWD+IFR-AK-CAZ-SC(5) 21,124.90 89.78 328.18 7,356.96 7,286.07 17,089.93 -4,494.70 5,982,793.87 1,485,268.74 0.83 17,267.79 MWD+IFR-AK-CAZ-SC(5) 21,219.89 90.16 329.64 7,357.01 7,286.12 17,171.28 -4,543.75 5,982,876.17 1,485,221.34 1.59 17,362.54 MWD+IFR-AK-CAZ-SC(5) 21,314.92 90.23 331.45 7,356.69 7,285.80 17,254.02 -4,590.48 5,982,959.83 1,485,176.29 1.91 17,457.48 MWD+IFR-AK-CAZ-SC(5) 21,409.43 90.81 331.39 7,355.83 7,284.94 17,337.01 -4,635.69 5,983,043.71 1,485,132.76 0.62 17,551.95 MWD+IFR-AK-CAZ-SC(5) 21,505.56 91.45 331.54 7,353.94 7,283.05 17,421.44 -4,681.60 5,983,129.04 1,485,088.56 0.68 17,648.02 MWD+IFR-AK-CAZ-SC(5) 21,600.74 89.95 329.74 7,352.77 7,281.88 17,504.39 -4,728.26 5,983,212.90 1,485,043.58 2.46 17,743.11 MWD+IFR-AK-CAZ-SC(5) 21,694.56 89.30 330.19 7,353.39 7,282.50 17,585.61 -4,775.22 5,983,295.04 1,484,998.27 0.84 17,836.79 MWD+IFR-AK-CAZ-SC(5) 21,790.87 89.34 329.37 7,354.53 7,283.64 17,668.82 -4,823.69 5,983,379.21 1,484,951.48 0.85 17,932.94 MWD+IFR-AK-CAZ-SC(5) 21,885.81 88.79 328.93 7,356.08 7,285.19 17,750.32 -4,872.37 5,983,461.66 1,484,904.46 0.74 18,027.66 MWD+IFR-AK-CAZ-SC(5) 21,985.54 90.08 332.33 7,357.06 7,286.17 17,837.21 -4,921.27 5,983,549.51 1,484,857.32 3.65 18,127.28 MWD+IFR-AK-CAZ-SC(5) 22,077.57 89.82 333.54 7,357.14 7,286.25 17,919.16 -4,963.14 5,983,632.28 1,484,817.10 1.34 18,219.31 MWD+IFR-AK-CAZ-SC(5) 12/22/2015 1:00:21PM Page 8 COMPASS 5000.1 Build 74 i i ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (0) (0) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,172.00 90.23 338.29 7.357.10 7,286.21 18,005.34 -5,001.67 5,983,719.22 1,484,780.32 5.05 18,313.59 MWD+IFR-AK-CAZ-SC(5) 22,267.46 91.33 342.11 7,355.80 7,284.91 18,095.13 -5,033.99 5,983,809.63 1,484,749.81 4.16 18,408.27 MWD+IFR-AK-CAZ-SC(5) 22,357.66 92.69 344.76 7,352.64 7,281.75 18,181.53 -5,059.69 5,983,896.52 1,484,725.86 3.30 18,496.91 MWD+IFR-AK-CAZ-SC(5) 22,450.47 92.60 344.09 7,348.36 7,277.47 18,270.83 -5,084.59 5,983,986.30 1,484,702.77 0.73 18,587.79 MWD+IFR-AK-CAZ-SC(5) 22,545.90 94.13 343.79 7,342.76 7,271.87 18,362.38 -5,110.94 5,984,078.35 1,484,678.26 1.63 18,681.32 MWD+IFR-AK-CAZ-SC(5) 22,645.88 94.05 339.66 7,335.62 7,264.73 18,457.05 -5,142.20 5,984,173.63 1,484,648.91 4.12 18,779.87 MWD+IFR-AK-CAZ-SC(5) 22,745.10 92.44 334.33 7,330.00 7,259.11 18,548.20 -5,180.91 5,984,265.53 1,484,612.05 5.60 18,878.65 MWD+IFR-AK-CAZ-SC(5) 22,840.21 93.04 331.02 7,325.45 7,254.56 18,632.59 -5,224.51 5,984,350.77 1,484,570.16 3.53 18,973.63 MWD+IFR-AK-CAZ-SC(5) 22,937.16 90.67 325.02 7,322.31 7,251.42 18,714.73 -5,275.80 5,984,433.93 1,484,520.53 6.65 19,070.12 MWD+IFR-AK-CAZ-SC(5) 23,029.65 89.95 322.48 7,321.81 7,250.92 18,789.32 -5,330.49 5,984,509.59 1,484,467.36 2.85 19,161.39 MWD+IFR-AK-CAZ-SC(5) 23,126.46 90.35 317.85 7,321.56 7,250.67 18,863.63 -5,392.49 5,984,585.13 1,484,406.87 4.80 19,255.76 MWD+IFR-AK-CAZ-SC(5) 23,220.21 89.40 312.45 7,321.76 7,250.87 18,930.07 -5,458.58 5,984,652.88 1,484,342.13 5.85 19,344.96 MWD+IFR-AK-CAZ-SC(5) 23,320.20 85.99 310.97 7,325.78 7.254.89 18,996.54 -5,533.15 5,984,720.83 1,484,268.92 3.72 19,438.04 MWD+IFR-AK-CAZ-SC(5) 23.371.00 85.99 310.97 7,329.34 7.258.45 19,029 76 -5,571.41 5,984,754.81 1,484,231.34 0.00 19,485.01 NOT an Actual Survey 4-1/2"x 6-1/2" 23.381 00 85.99 310.97 7.330.04 7.259.15 19,036.31 -5.578.94 5,984,761.50 1,484,223.94 0.00 19.494.26 PROJECTED to TD Projection to Bit 12/22/2015 1:00:21PM Page 9 COMPASS 5000.1 Build 74 • . v L 0 u itia2 :uiJ \® \ {/ }} c 0 - % ■G _.0 ) Q ( 0 { o ) \ \ 0 Q e a) f § /E ®\ (m >4:1) %§ § § % \jI. f \ / /E k /0 24 _ D - L O k / ' ' 0 •2 e:o o m CO (t 2 / 2 k m a) k n e � n 2 > 0 m O O m 0) L / E E EI 2 *-41 / t 0 as £ 6 / } 0 / a) / • 414215177 RECEIVED 16756 FES 02 [u('i WELL LOG TRANSMITTAL A a 6 CC DATA LOGGED K.BENDER To: Alaska Oil and Gas Conservation Comm. January 29, 2016 Attn.: Makana Bender 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 RE: RMT3D C/O-Sigma Saturation, Oxygen Activation, and Temperate: Run Date: 12/31/2015 and 01/01/2016 The technical data listed below is being submitted herewith. Please address any problems or concerns to the attention of: Fanny Sari, Halliburton Wireline&Perforating, 6900 Arctic Blvd., Anchorage, AK 99518 CD5-09 Digital Data in LAS format, Digital Log Image file, Interpretation Report 1 CD Rom 50-103-20723-00 RMT3D C/O-Sigma Saturation(Field and Processed Log) 1 Color Log-each 50-103-20723-00 RMT3D Oxygen Activation-Temperature Log (Field and Processed Log) 1 Color Log-each 50-103-20723-00 PLEASE ACKNOWLEDGE RECEIPT BY SIGNING AND RETURNING A COPY OF THE TRANSMITTAL LETTER TO THE ATTENTION OF: Halliburton Wireline&Perforating Attn: Fanny Sari 6900 Arctic Blvd. Anchorage, Alaska 99518 Office: 907-275-2605 Fax: 907-273-3535 FRS_ANC@halliburton.com Date: Signed: A:dA, 15_eit.tat RECEIVED • STATE OF ALASKA • JAN 2 1 2016 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la.Well Status: Oil R Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ lb.Well Class: 20AAC 25.105 20AAC 25.110 Development 0 - Exploratory ❑ GINJ ❑ WINJ❑ WAG❑ WDSPL❑ No. of Completions: Service ❑ Stratigraphic Test ❑ 2.Operator Name: 6. Date Comp.,Susp.,or 14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Aband.: 12/23/2015 a 215-177 3.Address: 7. Date Spudded: 15.API Number P.O. Box 100360 Anchorage,AK 99510-0360 11/21/2015 50-103-20723-00-00 /ACx 4a. Location of Well(Governmental Section): 8. Date TD Reached: 16.Well Name and Number: Surface: 339'FNL, 2593.33 FEL, Sec 18,T11 N, R4E, UM 12/17/2015 CRU CD5-09 - Top of Productive Interval: 9. Ref Elevations: KB: 70.89 • 17. Field/Pool(s): 736 FNL, 3371 FEL, Sec 6,T11 N, R4E, UM GL: 34.2 • BF: Colville River Unit/Alpine Pool,. Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 40,1 2425 FNL, 3249 FEL, Sec 25,T12N, R3E, UM 23,371 MD/7,329 TVD ASRC NPR ,ASRC NPR2,ASRC NPR1 4b. Location of Well(State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19. Land Use Permit: Surface: x- 349385 • y- 5965872 • Zone- 4 • 23,381/7,330 ` 932669, 932128,932126 TPI: x- 348772 y- 5976049 Zone- 4 12. SSSV Depth MD/TVD: 20.Thickness of Permafrost MD/TVD: Total Depth: x- 344190 y- 5985015 Zone- 4 NONE 1376 MD/1350 TVD 5. Directional or Inclination Survey: Yes 0(attached) No ❑ 13.Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 n/a (ft MSL) n/a 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion,suspension, or abandonment,whichever occurs first.Types of logs to be listed include, but are not limited to: mud log,spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance,dipmeter,formation tester,temperature, cement evaluation,casing collar locator,jewelry,and perforation record. Acronyms may be used.Attach a separate page if necessary GR/Res) /Wag t 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASINGGRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD FT. PULLED 20 94 B 37 115 37 115 42 5 yds. 10 3/4 45.5 L-80 37 2409 37 2170 13 1/2 1094 sx 11.0 ppg DeepCrete 279 sx 15.8 000 7 5/8 29.7/39 L-80/TN1 34 13272 34.5 7418 9 7/8 x 11 Stagel:397 sx 15.8 ppg Class G Stage2 4 1/2 12.6 L-80 13097 23371 7406 7329 6 1/2 n/a uncemented liner 24.Open to production or injection? Yes 0 No ❑ 25.TUBING RECORD If Yes, list each interval open(MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET(MD) PACKER SET(MD/TVD) Size and Number): 3 1/2 13,113 13096=MD,7406=TVD Orange Peel Shoe @ 23,371 MD, 7,329 TVD 12545=MD,7304=TVD COMPLETION 26.ACID, FRACTURE, CEMENT SQUEEZE, ETC. DATE Was hydraulic fracturing used during completion? Yes❑ No tt 23 1S Per 20 AAC 25.283(i)(2)attach electronic and printed information VERIFIED DEPTH INTERVAL(MD) AMOUNT AND KIND OF MATERIAL USED LL 27. PRODUCTION TEST Date First Production: Method of Operation(Flowing,gas lift,etc.): 1/5/2016 Gas Lift Date of Test: Hours Tested: Production for Oil-Bbl: Gas-MCF: Water-Bbl: Choke Size: -Y Gas-Oil Ratio: 1/8/2016 4 hrs Test Period - 150 137 109 1.88% 4.14.WO 815 Flow Tubing Casing Press: Calculated Oil-Bbl: Gas-MCF: Water-Bbl: Oil Gravity-API (corr): Press. 9f14 1183 24-Hour Rate -4 932 760 649 n/a Form 10-407 Revised 11/2015NT UED ON PAGE 2 ubmit ORIGINIAL only 6� qrcD 111. i`r RBDMS 0.- JAN 2 5 201 S • 28.CORE DATA Conventional Core(s): Yes ❑ No 0 Sidewall Cores: Yes ❑ No ❑ If Yes, list formations and intervals cored(MD/TVD, From/To), and summarize lithology and presence of oil,gas or water(submit separate pages with this form, if needed). Submit detailed descriptions,core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No 0 Permafrost-Top Surface Surface If yes, list intervals and formations tested, briefly summarizing test results. Permafrost-Base 1376 1350 Attach separate pages to this form, if needed,and submit detailed test Top of Productive Interval 13272 7418 information, including reports, per 20 AAC 25.071. C-30 2629 2313 K-3 5501 3772 Albian 97 6645 4353 Albian 96 8770 5434 11844 6998 Kalubik 12209 7179 Kuparuk C 12506 7292 Alpine C 12849 7377 Alpine A 13252 7417 TD 23381 7330 Formation at total depth: Alpine A 31. List of Attachments: Summary of Daily Operations, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to:summary of daily operations,wellbore schematic,directional or inclination survey, core analysis, Paleontological report. production or well test results. per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: William Earhart @_265-1077 ii.Jc L 1-1 1-I Email: William.C.Earhad cop.com CC- i_Z V 6 Printed Name: Chip Alvord Title: Alaska Drilling Manager Signature: , �.C� i-y` Phone: 265-6120 Date: 2-'(a INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed.All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class-Service wells: Gas Injection,Water Injection,Water-Alternating-Gas Injection,Salt Water Disposal,Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level,and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits(ex: 50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment,whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval(multiple completion),so state in item 1,and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump,Submersible,Water Injection, Gas Injection, Shut-in, or Other(explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071,submit detailed descriptions, core chips, photographs,and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability,fluid saturation,fluid composition,fluid fluorescence,vitrinite reflectance,geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form:well schematic diagram,summary of daily well operations,directional or inclination survey, and other tests as required including, but not limited to:core analysis,paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only i WNSOD CD5-09 ConocoPhillips 3 Well Attribu Max Angle TD Ali(sk3171,: Wellbore API/UWI Field Name Wellbore Status ncl(°) MD(ftKB) Act Btm(ftKB) %pnoccPhig"`z 501032072300 ALPINE PROD 95.16 17,122.24 23,381.0 ... Comment H2S(ppm) Date Annotation End Date KB-Grd(ft) -Rig Release Date HORIZONTAL-CD5-09,1/2120166:44:54 AM SSSV:NIPPLE Last WO: 36.69 12/23/2015 - Vero.]schamabc(amwll Annotation Depth(ftKB) End Date Annotation Last Mod By End Date Last Tag: Rev Reason:NEW WELL lehallf 1/11/2016 HANGER,31A-. Li_,S 4 Casing Strings T. I Casing Description OD(in) ID TopMOB) Set Depth ftKB Set Depth(TVD WVLen I Grade TopThread (in) l I P (ftKB) 1... (... CONDUCTOR _ 20 19.000 36.7 115.0 115.0 78.60 L-80 Welded s .i Casing Description OD(in) ID(in) Top(ftKB) -Set Depth(ftKB) Set Depth(TVD)...Wt/Len(I..Grade Top Thread SURFACE 103/4 9.950 36.8 2,409.2 2,169.6 45.50 L-80 Hyd 563 Casing Description OD(in) ID On) Top(ftKB) Set Depth(ftKB) Set Depth(TVD)... Wt/Len(I...Grade Top Thread INTERMEDIATE 7 5/8 6.875 34.5 13,271.7 7,418.4 29.70 L80 BTCM CONDUCTOR;36.7-115.0 IL Casing Description OD(in) ID(in) Top(ftKB) Set Depth(ftKB) 'Set Depth(TVD)... WVLen(I...Grade Top Thread Cross Oyer;121.0 LINER 41/2 3.958 13,096.6 23,371.0 7,329.3 12.60 L-80 IBT-M Liner Details ME Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Moir') Item Des Com (in) NIPPLE;522.0 13,096.6 7,406.0 85.89 PACKER Baker 5"x 7 5/8"HRD-E ZXP Liner Top Packer 5.250 it w/5.25"ID PBR 11.07' 13,117.9 7,407.6 85.87 NIPPLE Baker 5"RS Nipple 5"Hyd 563 Box x Box,18#L-80 4.000 p jl 13,120.4 7,407.7 85.87 HANGER Baker 5"x 7 5/8"Flex-Lock Liner Hanger Hyd 563 x 4.180 SURFACE;36.8-2,409.2-. BTC,1$#L-BB 13,135.2 7,408.8 85.85 XO Reducing Cross over,5"BTC-M x 4-1/2"Hyd 563 3.890 An 13,732.1 7,418.3 90.66 SLEEVE Camco 4 1/2"Sliding Sleeve,IBTM B x P 2.750""D" 2.750 GAS LIFT;4,798.3 profile,open dwn ME 13,851.2 7,416.1 91.60 FRAC PORT Sleeve,Frac Assy#10,4 1/2",Ball Act, 2.093 2.125"(2.093(D) 14,527.0 7,408.7 90.84 FRAC PORT Sleeve,Frac Assy#9,4 1/2",Ball Act, 2.035 2.063"(2.035"ID) GAS LIFT,9074 15,228.5 7,393.8 91.13 FRAC PORT Sleeve,Frac Assy#8,4 1/2",Ball Act, 1.954 I2.000"(1.954"10) GAS LIFT,1z,3sssr 15,961.3 7,400.4 88.30 FRAC PORT Sleeve,Frac Assy#7,4 1/2",Ball 1.890 Act,1.938"(1.8901D) 17,184.4 7,381.1 93.71 FRAC PORT Sleeve,Frac Assy#6,4 1/2",Ball 1.830 Act,1.875"(1.83'90) GAUGE,12,488.4 - 17,987.9 7,383.7 89.49 FRAC PORT Sleeve,Frac Assy#5,4 1/2",Ball 1.780 Act,1.813"(1.78'90) 18,828.9 7,383.9 92.40 FRAC PORT Sleeve,Frac Assy#4,4 1/2",Ball 1.705- x0 Threads;12,534.7 Act,1.75"(1.705"ID) PACKER;12,545.0 , 19,675.3 7,346.0 91.38 FRAC PORT Sleeve,Frac Assy#3,4 1/2",Ball 1.670 XO Threads;12,553.0 Act,1.688"(1.67"ID) isi NIPPLE.12,573.6 20,476.6 7,353.1 89.52 FRAC PORT Sleeve,Frac Assy#2,4 1/2",Ball 1.575 IAct,1.625"(1.5751D) 21,313.9 7,356.7 90.23 FRAC PORT Sleeve,Frac Assy#1,4 1/2",Ball Act, 1.520 LOCATOR,13,0922 ) 1.563"(1 52"ID) Tubing Strings MULE SHOE 13,112.1 Tubing Description String Ma.. ID(in) Top(ftKB) Set Depth(ft..!Set Depth(TVD)(...Wt(lb/ft) Grade Top Connection TUBING 31/2 2.992 31.4 13,113.1 7,4072 9.30 L-80 EUE-M Completion Details Nominal ID Top(ftKB) Top(TVD)(ftKB) Top Incl y) Item Des Com (in) 1 i I 31.4 31.4 0.00 HANGER Hanger,FMC 4 1/2"Metal to metal seals Drifted to 3.86" 3.908 I 121.0 121.0 0.28 Cross Over XO,4-1/2"HYD563 Box x 3-1/2"EUE 8rd Pin Drifted 2.992 INTERMEDIATE;34.6-13,271.7 2.91" 522.0 521.6 4.16 NIPPLE Nipple,Landing,3-1/2","DS",2.875",EUE 8rd-mod 2.875 fl 12,488.4 7,286.9 71.65 GAUGE 3-1/2",SLB Solid Gauge Mandrel with I-wire 2.920 12,545.0 7,304.0 72.85 PACKER Baker Premier Packer Hydril 563 BxP 2.880 _ _ 12,573.7 7,312.4 73.31 NIPPLE NIPPLE,LANDING,3 1/2",DS,2.812",EUE8RMOD 2.812 PERFP;13,851.2-13,854.0 _ 13,092.2 7,405.7 85.90 LOCATOR Locating sub(.49'to shear pins,1.44'to 6.39"No Go) 3.020 13,112.1 7,407.1 85.88 MULE SHOE Baker WLEG,muleshoe 3.480 PERFP;14,527.0-14,529.7 _ Perforations&Slots Shot Dens PERFP;15,228.5-15,231.2 TopTop(TVD) Btm(TVD) (shoal (ftKB) Btm(ftKB)) (ftKB) (ftKB) Zone Date ft) Type Com 13,851.2 13,854.0 7,416.1 7,4163 12/20/2015 PERFP FRAC PORT PERFP;15,961.3-15,964.0 14,527.0 14,529.7 7,408.7 7,408.7 12/20/2015 PERFP FRAC PORT 15,228.5 15,231.2 7,393.8 7,393.8 12/20/2015 PERFP FRAC PORT PERFP;17,184.4-17,187.1 2 15,961.3 15,964.0 7,400.4 7,400.4 12/20/2015 PERFP FRAC PORT PERFP,17,9879-17,990.7 17,184.4 17,187.1 7,381.1 7,381.0 12/20/2015 PERFP FRAC PORT _ r-� 17,987.9 17,990.7 7,383.7 7,383.7 12/20/2015 PERFP FRAC PORT PERFP;18,826.918,831 8 LJ 18,828.9 18,831.6 7,383.9 7,383.8 12/20/2015 PERFP FRAC PORT PERFP;19,675.8-18,878.1 19,675.3 19,678.1 7,346.0 7,345.9 12/20/2015 PERFP FRAC PORT _j-, 20,476.6 20,479.4 7,353.1 7,353.1 12/20/2015 PERFP FRAC PORT PERFP;20,4786-20,479.4 T.1 Er 21,313.9 21,316.6 7,356.7 7,356.7 12/20/2015 PERFP FRAC PORT PERFP;21,313.9-21,316.6 _i U 23,355.0 23,360.0' 7,328.2 7,328.6 12/20/2015 PERFP PERFORATED PUP, 36.5"HOLES PERFP.23,355.0-23,360.0 LINER;13,096.6-23,371.0 1 i WNS 4OD • CD5-09 ConocoPhillips a ' Alaska.Inc, CanocoPhilRpe ••• HORIZONTAL-C05-09,1/21/20166:44:55 AM Vertical,schematic(actual) HANGER;31.4 4L 1.,_.. Mandrel Inserts 1 I st ah er N Top(TVD)MValve Latch TRO Run Top(798. (3,41 Make Model 00(in) Sery Type Type Port(in)Size (psi) Run Date Corn 1 4,798.3 3,414.4 Camco KBMG 1 GAS LIFT GLV BK-5 0.188 2,023.0 12/29/2015 CONDUCTOR;36.7-115.0 ► 2 9,074.1 5,589.1 Camco KBMG 1 GAS LIFT GLV BK-5 0.188 1,913.0 12/28/2015 Crow Over;121.0 ;4 3 12,399.6 7,257.0 Camco KBMG 1 GAS LIFT OV BEK 0.250 0.0 12/28/2015 NIPPLE;522.0 Notes:General&Safety End Date Annotation NOTE SURFACE,36.8-2,409.2 GAS LIFT,4,798.3 iii /� C 'i } GAS LIFT;9,074.1 lir GAS LIFT,12,399.6 IN GAUGE;12,468.4 _ XO Threads;12,534.7 PACKER;12,545.0 XO Threads;12,553.0 III NIPPLE;12,573.6 LOCATOR;13,092.2 I )4 MULE SHOE;13,112.1 iaINTERMEDIATE;34.6-13,271.7, 9 u PERFP;13,851.2-13,854.0 r LI PERFP;14,527.0-14,529.7 Cr PERFP;15,228.5-15,231.2 11 LI PERFP,15961.3-15,964.O.--------Z' I [1. PERFP;17,184.4-17,187.1 =I CJ PERFP,17,987.9-17,990.7 _I Er PERFP;18,828.9-18,831.6 :I 4 PERFP;19,675.3.19,678.1 _t El PERFP;20,476.6-20,479.4 : [ Er PERFP;21,313.9-21,316.6 I 4 PERFP,23,355.0-23,360.0 LINER,13,096.6-23,371.0 0 Iperations Summary (with Timelog•pths) a CD5-09 ConocoPhillaps htn.k3 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/20/2015 11/20/2015 1.25 MIRU MOVE MOB P PJSM-review rig move check list. 0.0 0.0 06:00 07:15 SIMOPS-Electrician disconnect lines from sub to Pits.Jack and move pipe shed away from sub. Jack up and move Pits and Motors away from rig sub. 11/20/2015 11/20/2015 1.00 MIRU MOVE MOB P Skid rig floor into move position.Raise 0.0 0.0 07:15 08:15 rear wind walls and support feet 11/20/2015 11/20/2015 1.25 MIRU MOVE MOB P Raise rear wind walls and rig feet Jack 0.0 0.0 08:15 09:30 rig sub up and pull off of CD5-03. Continue to move Pit/Motors and Pipe shed off of Projects matting boards. Remove Tie bars on sub base and turn tires to crab down well pad. 11/20/2015 11/20/2015 0.25 MIRU MOVE MOB P Set rig down to wait on removal of 0.0 0.0 09:30 09:45 Projects rig mats. 11/20/2015 11/20/2015 2.00 MIRU MOVE MOB P Remove Projects matting boards and 0.0 0.0 09:45 11:45 replace. 11/20/2015 11/20/2015 0.25 MIRU MOVE MOB P Crab rig sub down pad. 0.0 0.0 11:45 12:00 11/20/2015 11/20/2015 1.00 MIRU MOVE MOB P Move MPD equipment 0.0 0.0 12:00 13:00 11/20/2015 11/20/2015 0.50 MIRU MOVE MOB P Jack up rig and continue to turn tires 0.0 0.0 13:00 13:30 and crab down pad. 11/20/2015 11/20/2015 1.50 MIRU MOVE MOB P Lift rear cellar wind wall and raise feet. 0.0 0.0 13:30 15:00 Spot rig sub over CD5-09 conductor. Lower feet and wind wall. 11/20/2015 11/20/2015 1.00 MIRU MOVE MOB P PJSM on skidding rig floor out. Skid 0.0 0.0 15:00 16:00 rig floor into drilling position.Lower rig support feet and cellar wind walls into position. Shim and level rig. 11/20/2015 11/20/2015 0.50 MIRU MOVE MOB P Spot Pits and Motor complexes into 0.0 0.0 16:00 16:30 position. Move pipe shed next to sub and level. Work on pre-spud check list.connect service lines at Interconnect.Spot Ball Mill and Pipe shed next to rig. 11/20/2015 11/20/2015 2.50 MIRU MOVE RURD P PU and NU Riser.RU to High-line. 0.0 0.0 16:30 19:00 Test gas alarms. Review and finalize Rig Acceptance check list. Note:rig on High-line power at 1745 hrs, 11/20/15. Note:Rig accepted on day work at 1800 hrs, 11/20/2015. 11/20/2015 11/20/2015 2.25 MIRU MOVE RURD P Install Riser clamp,flowline,hole fill 0.0 0.0 19:00 21:15 and bleeder.Hook up valves on conductor.Take on 9.0 ppg DRILPLEX mud in pits. 11/20/2015 11/20/2015 0.75 MIRU MOVE RURD P Calibrate block height. Survey True 0.0 0.0 21:15 22:00 north and wellbore heading with surface Gyro.Measure rig elevations. Survey True north and wellbore heading with surface Gyro. 11/20/2015 11/20/2015 1.00 MIRU MOVE SFTY P Hold pre-Spud safety mtg and review 0.0 0.0 22:00 23:00 checklist. Hold PJSM for MU BHA and Pre-Spud mtg with crew. 11/20/2015 11/21/2015 1.00 MIRU MOVE BHAH P PJSM and MU BHA#1 to 88'. 0.0 88.0 23:00 00:00 Page 1/24 Report Printed: 1/20/2016 `aerations Summary (with Timelog Sths) 0 rte, } ,'i CD5-09 Cc ocoPhirhps `'' Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (EKE) End Depth(MKS) 11/21/2015 11/21/2015 0.25 MIRU MOVE BHAH P Continue MU BHA#1 from 88'to 91'. 88.0 91.0 00:00 00:15 11/21/2015 11/21/2015 0.75 MIRU MOVE BHAH P Orient Motor/MWD. 91.0 91.0 00:15 01:00 11/21/2015 11/21/2015 0.25 MIRU MOVE SEQP P Fill hole with 9.0 ppg Drillplex mud and 91.0 115.0 01:00 01:15 lines with water.Check for leaks- good.RIH and tag bottom at 115'.Set down with 8K lb to confirm. 11/21/2015 11/21/2015 1.75 SURFAC DRILL DDRL P Spud well and drill ahead from 115'to 115.0 215.0 01:15 03:00 215', ADT: 1.20 hrs. 11/21/2015 11/21/2015 0.50 SURFAC DRILL PMPO P Pump-OOH from 215'to 94'and with 215.0 94.0 03:00 03:30 400 gpm,400 psi.Blow down TD. 11/21/2015 11/21/2015 1.50 SURFAC DRILL BHAH P Stand back stand of HWDP. Continue 94.0 215.0 03:30 05:00 to MU BHA to 196'with NMDCs,Jars and STAB. Wash to TD at 215'and orient tool face. 11/21/2015 11/21/2015 0.75 SURFAC DRILL SRVY P Run gyro survey(change out gyro 215.0 215.0 05:00 05:45 tool. 11/21/2015 11/21/2015 6.25 SURFAC DRILL DDRL P Drill 13-1/2"hole with motor from 215' 215.0 650.0 05:45 12:00 to 651'. ADT= 5.04 hrs,ART=3.61 hrs,AST=1.43 hrs. TVD=650'. PU= 105K,SO=107K,ROT=105K lb. TQ on/off=3.5K/2.0K ft-Ib, Gyro surveys at 93', 183',273',363',453' and 546"md. 11/21/2015 11/22/2015 - 12.00 SURFAC DRILL 'DDRL P Drill 13-1/2"hole with motor from 650' 650.0 1,925.0 12:00 00:00 to 1,925'. ADT=7.82 hrs,ART=5.14 hrs,AST=2.68 hrs. TVD=1,826'. PU=125K,SO=120K,ROT=90K lb. TQ on/off=4.1K/5.9K ft-lb(bit/BHA balling up), 11/22/2015 11/22/2015 6.00 SURFAC DRILL DDRL P Drill 13-1/2"hole with motor from 1,925.0 2,422.0 00:00 06:00 1,925' to 2,422'. ADT=4.85 hrs, ART=0.62 hrs,AST=4.23 hrs. TVD= 2,176'. PU=125K,S0=120K. TQ on/off=6.5K/5.4K ft-lb. 11/22/2015 11/22/2015 1.75 SURFAC CASING CIRC P Obtain final survey,CBU 5X at 800 2,422.0 2,422.0 06:00 07:45 gpm,2,400-2,300 psi,80 rpm,3K TQ.Pump 4x 30 bbl, 15 ppg nut plug sweeps(1st=200%increase,2nd= 150%,3rd=100%,4th=75%). 11/22/2015 11/22/2015 0.25 SURFAC CASING OWFF P Flow-chk for 15 min with 10 rpm,3K 2,422.0 2,422.0 07:45 08:00 TQ-static. 11/22/2015 11/22/2015 2.00 SURFAC CASING PMPO P Pump OOH from 2,422'-1,773'and 2,242.0 1,773.0 08:00 10:00 with 775 gpm,2,240-2,080 psi 60 rpm,5.3K TQ. PU=120K lb. Attempt to POOH w/o pumps but too high of drag. 11/22/2015 11/22/2015 2.00 SURFAC CASING PMPO P Continue to Pump-OOH from 1,773" 1,773.0 1,305.0 10:00 12:00 to 1,305'with 750 gpm,2,080 psi and no rotary. PU=120K lb.Blow down TD. Tight spots:1,907'1,847', 1,653, 1,627',1,597 and 1,559'. Worked thru each confirmed removed. 11/22/2015 11/22/2015 2.00 SURFAC -CASING TRIP P POOH from 1,305'to BHA at 196'. 1,305.0 196.0 12:00 14:00 11/22/2015 11/22/2015 0.25 SURFAC CASING OWFF P PJSM on LD BHA.Flow chk-static. 196.0 196.0 14:00 14:15 Calc/Actual bbls,fill=32.5/72.5 bbl Page 2/24 Report Printed: 1/20/2016 Operations Summary (with TimelogSpths) CA CD5-09 ConocoPhillrps Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/22/2015 11/22/2015 2.00 SURFAC CASING BHAH P LD BHA#1 from 196'. 196.0 0.0 14:15 16:15 11/22/2015 11/22/2015 0.75 SURFAC CASING BHAH P Clean and clear floor.RD 5"DP 0.0 0.0 16:15 17:00 elevators.PU casing tools and equipment. 11/22/2015 11/22/2015 2.25 SURFAC CASING RURD P RU Volant CRT tool.RU 4'bail 0.0 0.0 17:00 19:15 extensions and 10-3/4"elevators.RU casing tools.MU floor valve on XO. 11/22/2015 11/22/2015 0.25 SURFAC CASING SFTY P PJSM on running 10-3/4" casing, 0.0 0.0 19:15 19:30 11/22/2015 11/23/2015 4.50 SURFAC CASING PUTB P Run 10-3/4"Silver Bullet float shoe,2 0.0 886.0 19:30 00:00 jts 10-3/4"BTCM casing,HES float collar, 1 jts 10 3/4"BTC casing,XO- BTCM x H563(PxB).Baker-Lok first 3 connections.Check floats-okay. Continue running 10-3/4",45.5 Ib/ft,L- 80, H563,R3 casing to 886'(21 jts including shoe track). Avg MU torque =7,700 ft-lb for BTCM when made up to the mark using Run&Seal thread dope, 16,300 ft-lb torque for H563 connections with Seal Guard ECF thread dope.SO=75K lb. Cents= (Centek-10-3/4"bow springs,55 total): 1 -10'from shoe on stop collar, 1 -30'from pin on jt#2 on stop, 1 -20' from pin on jt#3, 1 -free floating on joints#4-54 11/23/2015 11/23/2015 4.50 SURFAC CASING PUTB P Continue running 10-3/4",45.5 Ib/ft,L 886.0 2,369.0 00:00 04:30 -80, H563,R3 casing to 2,369'. SO= 125K(pumps off). 11/23/2015 11/23/2015 0.75 SURFAC CASING HOSO P MU casing hanger and landing joint. 2,369.0 2,409.0 04:30 05:15 Establish circulation with 2 bpm and 170 psi. Land casing on hanger at 2,409'md. PU=145K,SO=125K lb. 11/23/2015 11/23/2015 2.50 SURFAC CEMENT CIRC P Circ&cond mud for cement job Stage 2,409.0 2,409.0 05:15 07:45 flow rate from 0.5-8 bpm,40-180 psi,reciprocate pipe 10'. (SIMOPs- RD casing tools and equipment.RD 4' bail extensions, 10.75"elevators for TD and LD.Clean&clear floor.PU= 140K,SO=135K lb(pumps on). 11/23/2015 11/23/2015 0.75 SURFAC CEMENT RURD P BD Top drive and RU cement lines to 2,409.0 2,409.0 07:45 08:30 cement swivel. Fill lines with 4.5 bpm, 200 psi. Page 3/24 Report Printed: 1/20/2016 0.-- :_,'(?,., io &rations Summary (with Timelog Sths) rpt ' - : .,t...? CD5-09 C omcoPhalaps Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/23/2015 11/23/2015 2.50 SURFAC CEMENT CMNT P PJSM. Surface cement job:Dowell 2,409.0 2,409.0 08:30 11:00 pump 1.0 bbls H2O and test lines to 2,500 psi-good,Dowell pump 71.3 bbls 10.5 ppg Mud Push II,Drop bottom plug,Dowell pump 9 bbls of 11.0 ppg scavenger slurry,372.2 bbls total 11.0 ppg Lead DeepCRETE cement plus additives, 1.91 ft3/sk yield at 5.7 bpm,250-440 psi.Dowell pump 57 bbls, 15.8 ppg,"G", 1.17 ft3/sx Tail cement at 3.3-4.4 bpm/580 -170 psi.Drop top plug.Dowell pump 10 bbls H2O.Rig displace with 212 bbls of 10.0 ppg DrillPlex spud mud with YP=19.Initial 8 bpm at 890 psi, decreasing to 3 bpm at 500 psi. Increase to 500 psi over at 1,000 psi and hold for 5 min.Check floats- good.Full returns throughout 218 bbls good cement back to surface. Reciprocated pipe with 10'stroke until MudPush exited shoe.Stopped reciprocating due to excess drag and hole appearing to get sticky.CIP at 11:06 hrs, 11/23/15. 11/23/2015 11/23/2015 1.00 SURFAC CEMENT RURD P Flush surface riser and Annular with 0.0 0.0 11:00 12:00 black water. Function annular 3X, close and monitor annulus pressure. Check pressure every 10 min for one hour and every 30 min there after. Pressure=11 psi when SI. 11/23/2015 11/23/2015 1.50 SURFAC CEMENT RURD P BD and RD cement lines.RD Volant 0.0 0.0 12:00 13:30 CRT,power tongs,elevators and LD. Clear and clean rig floor. Monitor pressure under annular. 11/23/2015 11/23/2015 2.50 SURFAC CEMENT WOC P Continue to WOC.Perform Top Drive 0.0 0.0 13:30 16:00 inspection.SIMOPs-continue to clear and clean the rig floor. 11/23/2015 11/23/2015 7.25 SURFAC CEMENT PULD P PJSM. PU 5"DS50 Hi-Torque double 0.0 0.0 16:00 23:15 shoulder DP and MU in mouse hole. Break in new connection per manufacturer specs and rack back in derrick while WOC. 11/23/2015 11/23/2015 0.50 SURFAC CEMENT OWFF P PU/MU stack washer. Check 0.0 0.0 23:15 23:45 pressure under annular(initial=11 psi,final=15 psi).Open annulus valve, intermittent droplets after 10 minutes.Open annular preventer and drain stack. 11/23/2015 11/24/2015 0.25 SURFAC CEMENT RURD P Lay down 10-3/4"landing joint. 0.0 0.0 23:45 00:00 11/24/2015 11/24/2015 1.25 SURFAC CEMENT WWWH P M/U stack washer&flush stack.B/D 0.0 0.0 00:00 01:15 top drive&L/D same. 11/24/2015 11/24/2015 3.75 SURFAC CEMENT NUND P R/D drain lines.B/D hole fill&bleeder 0.0 0.0 01:15 05:00 lines.N/D flow line,surface riser.N/D annular preventer&speed lock adaptor. 11/24/2015 11/24/2015 0.50 SURFAC WHDBOP NUND P N/U well head&test to 1000 psi for 10 0.0 0.0 05:00 05:30 min(good) 11/24/2015 11/24/2015 2.50 SURFAC WHDBOP NUND P N/U BOPE,choke lines&annulus 0.0 0.0 05:30 08:00 valves. Page 4/24 Report Printed: 1/20/2016 Operations Summary (with Timeloglpths) 0.6 0.74 CD5-09 ConocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/24/2015 11/24/2015 4.00 SURFAC WHDBOP MPDA P N/U RCD clamp,flow box,flow lines& 0.0 0.0 08:00 12:00 bleeder valves.N/U MPD lines&orbit valve.Install trip nipple.SIMOPS- Charge koomy unit&install 90'mouse hole. 11/24/2015 11/24/2015 1.00 SURFAC WHDBOP RURD P P/U 5"test jt&set test plug.R/U 0.0 0.0 12:00 13:00 testing equipment.Fill stack&lines w/H20.SIMOPS-Tested gas alarms. 11/24/2015 11/24/2015 4.00 SURFAC WHDBOP BOPE P BOPE Test:Test with 5"test joint, 0.0 0.0 13:00 17:00 Test Annular to 250/2,500 psi for 5 min,Test choke valves#1 -14 and needle valve to 250/3,500 psi for 5 min.HCR Choke and Kill,4"Demco, 5"FOSV,dart&needle valves,auto& manual IBOP,HCR choke&kill,3 1/2" X 6"upper&lower VBR's,&blind rams to 250/3500 psi for 5 min.- good.Koomey test;IP=3,100 psi, manifold press after close=1,550 psi, 200 psi recovery 36 sec,full recovery 210 sec, N2-4 bottle average=1959 psi.Draw down on man&super choke to 1,100 psi. - Test witnessed by Brian Bixby of the AOGCC. 11/24/2015 11/24/2015 4.25 SURFAC WHDBOP MPDA P Finish R/U MPD equipment.R/U catch 0.0 0.0 17:00 21:15 can&2"MPD valves.Remove trip nipple&install MPD test plug.Test MPD equipment to 200/1200 psi& chart.Stab MPD bearing on stand of 5"DP&rack back in derrick. Install MPD trip nipple. 11/24/2015 11/24/2015 1.00 SURFAC WHDBOP RURD P M/U test jt&pull test plug. Install 10" 0.0 0.0 21:15 22:15 ID wear ring.Clean&clear floor. 11/24/2015 11/24/2015 0.25 SURFAC CEMENT SFTY P PJSM on BHA 0.0 0.0 22:15 22:30 11/24/2015 11/25/2015 1.50 SURFAC CEMENT BHAH P M/U BHA#2 as per SLB to 108' 0.0 108.0 22:30 00:00 11/25/2015 11/25/2015 0.75 SURFAC CEMENT BHAH P Cont.to M/U BHA#2 as per SLB to 108.0 149.0 00:00 00:45 149' 11/25/2015 11/25/2015 1.75 SURFAC CEMENT TRIP P RIH f/149'to 2,228' 149.0 2,228.0 00:45 02:30 11/25/2015 11/25/2015 0.50 SURFAC CEMENT DHEQ P Shallow hole test MWD&cvirc B/U 2,228.0 2,228.0 02:30 03:00 w/675-575 gpm @ 2140-1600 psi, 30 rpm @ 4.5 k trq 11/25/2015 11/25/2015 1.50 SURFAC CEMENT PRTS P R/U testing equip&test casing to 2,228.0 2,228.0 03:00 04:30 3500 psi&chart for 30 min(good). R/D testing equip&B/D lines 11/25/2015 11/25/2015 3.50 SURFAC CEMENT MPDA P Pull trip nipple&install MPD bearing. 2,228.0 2,228.0 04:30 08:00 Conduct ramp up&ramp down with new software as per MPD advisor. B/D lines. Remove MPD bearing& install trip nipple. 11/25/2015 11/25/2015 2.50 SURFAC CEMENT COCF P W&R(/2,228'to top of float collar @ 2,228.0 2,324.0 08:00 10:30 2,324'w/550 gpm @ 1420 psi,30-5o rpm @ 5 k trq.(Tag TOO @ 2,304') 11/25/2015 11/25/2015 2.25 SURFAC CEMENT DRLG P Drill out shoe track&rat hole f/2,324' 2,324.0 2,442.0 10:30 12:45 to 2,442'w/550 gpm @ 1060 psi,60 rpm @ 5 k trq.Displace to 9.6 ppg LSND on the fly Page 5/24 Report Printed: 1/20/2016 &rations Summary (with Timelog 140ths) or , CD5-09 ConocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code lime P-T-X Operation (ftKB) End Depth(ftKB) 11/25/2015 11/25/2015 0.25 SURFAC CEMENT TRIP P B/D top drive&POOH f/2,442'to 2,442.0 2,237.0 12:45 13:00 2,237' 11/25/2015 11/25/2015 1.00 SURFAC CEMENT OWFF P F/C(static) 2,237.0 2,237.0 13:00 14:00 11/25/2015 11/25/2015 0.75 SURFAC CEMENT TRIP P RIH f/2,237'to 2,442' 2,237.0 2,442.0 14:00 14:45 11/25/2015 11/25/2015 0.25 SURFAC CEMENT DDRL P Drill ahead f/2,442'to 2,454' 2,442.0 2,454.0 14:45 15:00 11/25/2015 11/25/2015 0.50 SURFAC CEMENT CIRC P Circ B/U w/550 gpm @ 1060 psi,60 2,454.0 2,454.0 15:00 15:30 rpm @ 5 k trq.SIMOPS-PJSM on FIT 11/25/2015 11/25/2015 0.50 SURFAC CEMENT TRIP P POOH f/2,454'to 2,232' 2,454.0 2,232.0 15:30 16:00 11/25/2015 11/25/2015 0.75 SURFAC CEMENT FIT P R/U testing equip&FIT to 18.0 ppg 2,232.0 2,232.0 16:00 16:45 11/25/2015 11/25/2015 0.25 INTRMI DRILL -TRIP P RIH f/2,232'to 2,454' 2,232.0 2,454.0 16:45 17:00 11/25/2015 11/25/2015 2.25 INTRM1 DRILL DDRL P Drill ahead f/2,454'to 2,550'w/750 2,454.0 2,550.0 17:00 19:15 gpm @ 1840 psi,60 rpm @ 5 k trq. SIMOPS-PJSM on opening reamer. 11/25/2015 11/25/2015 0.75 INTRM1 DRILL CIRC P Drop 1 1/4"activation ball&pump 2,550.0 2,550.0 19:15 20:00 down w/75 gpm @ 80 psi.Reamer shear @ 1350 psi&open reamer @ 2,526'(11"hole @ 2,424') Reamer closed:750 gpm, 1840 psi, 4140 trpm Reamer open:750 gpm, 1420 psi, 3515 trpm. 11/25/2015 11/26/2015 4.00 INTRM1 DRILL DDRL P Drill ahead f/2,550'to 3.082'MD 2,550.0 3,082.0 20:00 00:00 2,547'TVD,ADT 4.35,ECD 10.66 ppg,775 gpm,1650 psi,PU wt 123 k, SO wt 112 k,ROT wt 117 k,Trq 3.1/5.6 k ft lbs 11/26/2015 11/26/2015 12.00 INTRM1 DRILL DDRL P Drill ahead f/3,082'to 4,917'MD 3,082.0 4,917.0 00:00 12:00 3,476'TVD,ADT 8.98,ECD 11.22 ppg,775 gpm,2100 psi, PU wt 155 k, SO wt 120 k,ROT wt 135 k, 160 rpm, Trq 10/4.5 k ft lbs, 18/20 wob. Pumping high wt nut plug sweeps to aid in BHA balling&hole cleaning 11/26/2015 11/27/2015 12.00 INTRMI DRILL -DDRL P Drill ahead f/4,917 to 6,626'MD 4,344' 4,917.0 6,626.0 12:00 00:00 TVD,ADT 8.81, ECD 11.20 ppg,775 gpm,2320 psi,PU wt 175 k,SO wt 135 k, ROT wt 150 k, 180 rpm,Trq 14.4/7.1 k ft lbs, 18/20 wob.Pumping nut plug sweeps to aid in BHA balling &hole cleaning 11/27/2015 11/27/2015 12.00 INTRM1 DRILL DDRL P Drill ahead f/6,626'to 8,075'MD 6,626.0 8,075.0 00:00 12:00 5,080'TVD,ADT 8.94,ECD 10.98 ppg,775 gpm,2300 psi,PU wt 190 k, SO wt 145 k,ROT wt 165 k, 180 rpm, Trq 15.4/9 k ft lbs, 13/18 wob. Pumping nut plug sweeps to aid in BHA balling&hole cleaning 11/27/2015 11/27/2015 0.75 INTRM1 DRILL DDRL P Drill ahead f/8,075'to 8,169'MD 8,075.0 8,169.0 12:00 12:45 5,127'TVD,ADT.52 11/27/2015 11/27/2015 0.75 INTRMI DRILL RGRP T POOH f/8,169'to 8,075'.Trouble 8,169.0 8,075.0 12:45 13:30 shoot IBOP actuator linkage.Repair same.SIMOPS-Inspect&service top drive. Page 6/24 Report Printed: 1/20/2016 44111 t, •perations Summary (with Timeloglpths) CA CD5-09 ConocoPhilkps AL:Aa Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code lime P-T-X Operation (ftKB) End Depth(ftKB) 11/27/2015 11/27/2015 0.50 INTRMI DRILL REAM T W&R f/8,075'to 8,169'w1775 gpm @ 8,075.0 8,169.0 13:30 14:00 2280 psi, 100 rpm @ 7 k trq 11/27/2015 11/28/2015 10.00 INTRM1 DRILL DDRL P Drill ahead f/8,169"to 9,483'MD 8,169.0 9,483.0 14:00 00:00 5,800'TVD,ADT 7.59,ECD 11.14 ppg,775 gpm,2560 psi, PU wt 219 k, SO wt 150 k,ROT wt 179 k, 180 rpm, Trq 19/10.5 k ft lbs,24/30 wob. Pumping nut plug sweeps to aid in BHA balling&hole cleaning 11/28/2015 11/28/2015 12.00 INTRM1 DRILL DDRL P Drill ahead f/9,483'to 10,889'MD 9,483.0 10,889.0 00:00 12:00 6,513'TVD,ADT 9.31,ECD 11.03 ppg,775 gpm,2460 psi,PU wt 265 k, SO wt 157 k,ROT wt 188 k,180 rpm, Trq 23/14 k ft lbs,20/25 wob.Pumping nut plug sweeps to aid in BHA balling &hole cleaning 11/28/2015 11/28/2015 0.50 INTRM1 DRILL CIRC P Circ for 30 min w/775 gpm @ 2520 10,889.0 10,889.0 12:00 12:30 psi, 150 rpm @ 18 k trq. 11/28/2015 11/28/2015 1.25 INTRM1 DRILL MPDA P B/D top drive.Remove trip nipple& 10,889.0 10,889.0 12:30 13:45 install MPD bearing.SIMOPS-F/C (static) 11/28/2015 11/28/2015 0.75 INTRM1 DRILL CIRC P Stage up circulation to 775 gpm&150 10,889.0 10,889.0 13:45 14:30 Break in MPD bearing.Start weighting up f/9.6 to 10.5 ppg 11/28/2015 11/28/2015 4.50 INTRM1 DRILL DDRL P Drill ahead f/10,889'to 11,264'MD 10,889.0 11,264.0 14:30 19:00 6,702'TVD,ADT 3.46,ECD 11.75 ppg,775 gpm,2970 psi,PU wt 250 k, SO wt 160 k,ROT wt 190 k, 150 rpm, Trq 23/14 k ft lbs,20/25 wob.Pumping nut plug sweeps to aid in BHA balling &hole cleaning. Attempting to hold back presure with MPD.Pressure bleeding off through drill pipe.It appears floats are washed out and not holding. 11/28/2015 11/28/2015 0.25 INTRM1 DRILL CIRC T Install TIW valve on drill string. 11,264.0 11,264.0 19:00 19:15 Circulate thru cement line up across top of annulus under MPD bearing. Slowly close MPD chokes to simulate connection.Fluid returns thru drill string.Confirm floats not holding. Decision made to POOH and C/O BHA. 11/28/2015 11/28/2015 2.00 INTRM1 DRILL CIRC T Drop 1 5/8"ball&close reamer.Shear 11,264.0 11,264.0 19:15 21:15 closed @ 2170 psi Reamer Open @ 775 gpm,2970 psi, 3632 trpm Reamer Closed @ 775 gpm,3300 psi, 4179 trpm 11/28/2015 11/29/2015 2.75 INTRM1 DRILL CIRC T Circ hole clean for 4 B/U w/775 gpm 11,264.0 11,264.0 21:15 00:00 @ 3260 psi, 150 rpm @ 16-16 k trq. 11/29/2015 11/29/2015 1.25 INTRM1 DRILL CIRC T Circ hole clean for 1 B/U w/775 gpm 11,264.0 11,170.0 00:00 01:15 @ 3260 psi,150 rpm @ 16-16 k trq. 11/29/2015 11/29/2015 0.25 INTRM1 DRILL OWFF T F/C(static)SIMOPS-B/T top drive 11,170.0 11,170.0 01:15 01:30 line up to Strip OOH 11/29/2015 11/29/2015 0.50 INTRMI DRILL TRIP T Strip OOH f/11,170'to 10,702'as per 11,170.0 10,702.0 01:30 02:00 MPD schedule Page 7/24 Report Printed: 1/20/2016 !0 .erations Summary (with Timelog �iths) „�- .i..:_.....-: CD5-09 C_onoco?hilliips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 11/29/2015 11/29/2015 0.75 INTRM1 DRILL CIRC T Pump 12.5 ppg dry job.B/D top drive. 10,702.0 10,702.0 02:00 02:45 Line up MPD and establish circ. 11/29/2015 11/29/2015 7.75 INTRM1 DRILL TRIP T Strip OOH f/10,702'to 2,331'as per 10,702.0 2,331.0 02:45 10:30 MPD schedule 11/29/2015 11/29/2015 0.50 INTRM1 DRILL OWFF T F/C(static) 2,331.0 2,331.0 10:30 11:00 11/29/2015 11/29/2015 1.00 INTRM1 DRILL TRIP T Strip OOH f/2,331'to 729'as per MPD 2,331.0 729.0 11:00 12:00 schedule 11/29/2015 11/29/2015 0.50 INTRM1 DRILL OWFF T F/C(static) 729.0 729.0 12:00 12:30 11/29/2015 11/29/2015 1.25 INTRM1 DRILL MPDA T Remove MPD bearing.Install trip 729.0 729.0 12:30 13:45 nipple. 11/29/2015 11/29/2015 5.25 INTRM1 DRILL BHAH T Rack back HWDP.L/D BHA#2 as per 729.0 0.0 13:45 19:00 SLB.(Could not break bit from Exceed,tong wrench slipping.Left bit on Exceed&L/D) 11/29/2015 11/29/2015 1.25 INTRM1 DRILL BHAH T Clean&clear floor of BHA tools& 0.0 0.0 19:00 20:15 equip.Clean cuttings from flow box. 11/29/2015 11/29/2015 2.50 INTRM1 DRILL BHAH T M/U BHA#3 as per SLB to 148' 0.0 148.0 20:15 22:45 11/29/2015 11/30/2015 1.25 INTRM1 DRILL TRIP T RIH w/BHA#3 f/148' to 1,483' 148.0 1,483.0 22:45 00:00 11/30/2015 11/30/2015 0.50 INTRM1 DRILL TRIP T RIH f/1,483'to2,331' 1,483.0 2,331.0 00:00 00:30 11/30/2015 11/30/2015 0.75 INTRM1 DRILL DHEQ T Shallow hole test MWD w/450 gpm @ 2,331.0 2,331.0 00:30 01:15 920 psi.SIMOPS-PJSM on Slip& Cut 11/30/2015 11/30/2015 0.75 INTRM1 DRILL SLPC T Slip&cut 60'drill line 2,331.0 2,331.0 01:15 02:00 11/30/2015 11/30/2015 1.00 INTRM1 DRILL SVRG T Service rig&top drive.Adjust blocks 2,331.0 2,331.0 02:00 03:00 &calibrate block height 11/30/2015 11/30/2015 9.00 INTRM1 DRILL TRIP T RIH f/2,331'to 11,073'.(C/O bad jt on 2,331.0 11,073.0 03:00 12:00 stand#65) 11/30/2015 11/30/2015 3.50 INTRM1 DRILL REAM T W&R f/11,073'to 11,264'w/775 gpm 11,073.0 11,264.0 12:00 15:30 @ 3060 psi, 150 rpm @ 18.5 k trq 11/30/2015 11/30/2015 1.50 INTRM1 DRILL CIRC T Drop 1 1/4"ball&open reamer.Shear 11,264.0 11,264.0 15:30 17:00 open @ 1360 psi Reamer Closed @ 775 gpm,3060 psi, 3828 trpm Reamer Open @ 775 gpm,2960 psi, 3476 trpm 11/30/2015 11/30/2015 1.50 INTRM1 DRILL MPDA T Remove trip nipple&install MPD 11,264.0 11,264.0 17:00 18:30 bearing.Break in bearing as per MPD advisor. 11/30/2015 12/1/2015 5.50 INTRM1 DRILL DDRL P Drill ahead f/11,264'to 11,542'MD 11,264.0 11,542.0 18:30 00:00 6,844 TVD,ADT 4.07,ECD 11.44 ppg,775 gpm,2630 psi,PU wt 245 k, SOwt165k, ROT wt195k, 150 rpm, Trq 22.5/16.5 k ft lbs,30/35 wob. Holding back pressure on connections as per MPD advisor Page 8/24 Report Printed: 1/20/2016 •perations Summary (with Timelog lTepths) 0 CD5-09 ConocoPhilliips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/1/2015 12/1/2015 12.00 INTRMI DRILL DDRL P Drill ahead f/11,542'to 12,477'MD 11,542.0 12,477.0 00:00 12:00 7,289'TVD,ADT 8.99,ECD 11.15 ppg,775 gpm,2770 psi,PU wt 285 k, SO wt 155 k,ROT wt 205 k, 150 rpm, Trq 24/15 k ft lbs,20/25 wob.Holding back pressure on connections as per MPD advisor 12/1/2015 12/2/2015 12.00 INTRM1 DRILL DDRL P Drill ahead f/12,477'to 13,252'MD 12,477.0 13,252.0 12:00 00:00 7,417'TVD,ADT 8.72,ECD 11.44 ppg,775 gpm,2690 psi,PU wt 295 k, SO wt 155 k,ROT wt 200 k, 140 rpm, Trq 27/20 k ft lbs,20/24 wob.Holding back pressure on connections as per MPD advisor 12/2/2015 12/2/2015 0.50 INTRM1 DRILL DDRL P Drill ahead f/13,252'to TD of 13,283' 13,252.0 13,283.0 00:00 00:30 MD 7,419'TVD,ADT.42,ECD 11.52 ppg,775 gpm,2610 psi,PU wt 275 k, SO wt 155 k,ROT wt 205 k, 140 rpm, Trq 28/21 k ft lbs,20/24 wob.Holding back pressure on connections as per MPD advisor 12/2/2015 12/2/2015 1.25 INTRM1 CASING CIRC P Obtain final survey.Drop 1 5/8"ball& 13,283.0 13,283.0 00:30 01:45 close reamer.Shear closed @ 2150 psi Reamer Open @ 775 gpm,2690 psi, 3930 trpm Reamer Closed @ 775 gpm,2900 psi, 4560 trpm 12/2/2015 12/2/2015 5.75 INTRM1 CASING CIRC P Circ hole clean for 6 B/U w/775 gpm 13,283.0 13,283.0 01:45 07:30 @ 2950 psi, 150 rpm @ 21 k trq.Hold back pressure with MPD to mainatin 11.5 ppg ECD 12/2/2015 12/2/2015 3.00 INTRM1 CASING CIRC P Wt up from 10.5 ppg to 11.1 ppg as 13,283.0 13,283.0 07:30 10:30 per wt up schedule.Initial 775 gpm @ 3380 psi,150 rpm @ 22 k trq&final 500 gpm @ 1700 psi,50 rpm @ 18 k trq. 12/2/2015 12/2/2015 0.50 INTRM1 CASING OWFF P F/C w/10 rpm(static) 13,283.0 13,283.0 10:30 11:00 12/2/2015 12/2/2015 0.25 INTRM1 CASING MPDA P B/D top drive&line up MPD 13,283.0 13,283.0 11:00 11:15 equipment to Strip OOH 12/2/2015 12/2/2015 10.50 INTRMI CASING TRIP P Strip OOH as per MPD schedule 13,283.0 729.0 11:15 21:45 f/13,283'to 729'(F/C @ 10 3/4"shoe) 12/2/2015 12/2/2015 0.50 INTRM1 CASING OWFF P F/C(static)SIMOPS-drain MPD lines 729.0 729.0 21:45 22:15 &bring trip nipple to rig floor.PJSM on RCD bearing. 12/2/2015 12/3/2015 1.75 INTRM1 CASING MPDA P Pull RCD bearing&strip off DP. Install 729.0 729.0 22:15 00:00 trip nipple.(Air boot leaking,C/O air boot) 12/3/2015 12/3/2015 0.50 INTRM1 CASING MPDA P C/O air boot.Install trip nipple.Fill 729.0 729.0 00:00 00:30 hole 12/3/2015 12/3/2015 1.00 INTRMI CASING TRIP P POOH f/729'to 148'.(LiD jars) 729.0 148.0 00:30 01:30 12/3/2015 12/3/2015 2.00 INTRMI CASING BHAH P UD BHA#3 as per SLB(Could not 148.0 0.0 01:30 03:30 break bit from Exceed) 12/3/2015 12/3/2015 0.50 INTRMI CASING BHAH P Clean&clear floor of BHA tools 0.0 0.0 03:30 04:00 Page 9/24 Report Printed: 1/20/2016 ...,..T.,,;__,--.r rations Summary (with Timelogths) o i(,L__t 1 t CD5-09 ConocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/3/2015 12/3/2015 1.00 INTRM1 CASING VWWVH P Drain stack observe large amounts of 0.0 0.0 04:00 05:00 cllay in ram cavitys.M/U stack washer &flush stack. 12/3/2015 12/3/2015 0.25 INTRMI CASING BOPE P Pull wear ring.&close blind rams. 0.0 0.0 05:00 05:15 Monitor annulus 12/3/2015 12/3/2015 2.25 INTRM1 CASING RURD P R/U to run casing.R/U power tongs& 0.0 0.0 05:15 07:30 Volant.R/U bail extensions, 150 ton elevators&spiders.SIMOPS C/O upper pipe rams to 7 5/8" 12/3/2015 12/3/2015 2.00 INTRMI CASING BOPE P R/U testing equip&set test plug.Test 0.0 0.0 07:30 09:30 Annular 250/2500 psi,UPR's 250/3500 psi&chart for 5 min.Pull test plug&set thin 10.25"ID wear ring. 12/3/2015 12/3/2015 1.00 INTRM1 CASING RURD P Finsih R/U to run casing. 0.0 0.0 09:30 10:30 12/3/2015 12/3/2015 6.50 INTRM1 CASING PUTB P PJSM.Run 7 5/8"casing to 2,392'. 0.0 2,392.0 10:30 17:00 (HES float shoe,2 jts 7 5/8"39#TN 110 Hyd 563 casing,HES float collar w/baffle adaptor,1 jt 7 5/8"39#TN 110 Hyd 563 casing,HES baffle collar, 15 jts 7 5/8"39#TN 110 Hyd 563 casing,XO,37 jts 7 5/8"29.7#L-80 BTCM casing) On jt#50 started making up casing with Volant,collars on casing bumping &taking wt on wear ring. 12/3/2015 12/3/2015 5.00 INTRMI CASING OTHR T Trouble shoot collars&wear ring. 2,392.0 2,392.0 17:00 22:00 POOH with casing&L/D 1 jt.Perform dummy rum with hanger.Hanger made contact with wear ring.Land casing on hanger.UD landing jt&M/U wear ring puller.Pull wear ring.Slight compression damage to wear ring. C/O wear ring.UD wear ring puller. M/U landing jt&pull hanger out of hole.UD landing jt&hanger.Cont.to run casing. 12/3/2015 12/4/2015 2.00 INTRM1 CASING PUTB P Run 7 5/8"29.7#L-80 BTCM casing 2,392.0 3,124.0 22:00 00:00 f/2,392'to 3,124'.(Alignment with Volant and casing box severe.RIH casing with power tongs,fill pipe every 10 jts with Volant) 12/4/2015 12/4/2015 23.50 INTRM1 CASING PUTB P RIH 7 5/8"29.7 L-80 BTCM&Hyd 563 3,124.0 13,234.0 00:00 23:30 Dopeless casing f/3,124'to 13,234'(Tight spot @ 8,680', 11,045' &top of Kalubik @ 12,165'.P/U casing with pumps&work through once)Had to work casing down once shoe entered Alpine sands. 112/4/2015 12/5/2015 0.50 INTRM1 CASING HOSO P M/U hanger&landing jt.Land casing 13,234.0 13,272.0 23:30 00:00 on hanger @ 13,271.65'(Casing hanger hung up on wear ring.Landed casing and did not attempt to pick up) 12/5/2015 12/5/2015 2.75 INTRM1 CEMENT CIRC P Circ&cond mud for cement job. 13,272.0 13,272.0 00:00 02:45 Stage flow rate up to 4 bpm @ 740 psi with full returns.SIMOPS-R/D casing tongs,tools&equipoment,slips and elevators.UD same via beaver slide. Page 10/24 Report Printed: 1/20/2016 Iperations Summary (with Timelog epths) CD5-09 conocophitiaps hls.La Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (5KB) End Depth(ftKB) 12/5/2015 12/5/2015 0.25 INTRM1 CEMENT RURD P B/D top drive.R/U cement lines to 13,272.0 13,272.0 02:45 03:00 cement swivel on Volant. 12/5/2015 12/5/2015 6.00 INTRM1 CEMENT CIRC P Circ&cond mud for cement job. 13,272.0 13,272.0 03:00 09:00 Stage pumps up to 7.5 bpm @ 740 psi ICP&680 psi FCP with full returns. SIMOPS-L/D 5"subs&equipment. P/U 4"subs&equipment.Prep to C/O rams.PJSM on cementing @ 8:45 hrs. 12/5/2015 12/5/2015 2.50 INTRM1 CEMENT CMNT P Cement 1st stage cement job.Dowell 13,272.0 13,272.0 09:00 11:30 flood lines w/H2O&pressure test to 4000 psi(good).Dowell pump 42.8 bbls 12.0 ppg Mud Push,Drop bypass plug,Dowell pump 82.2 bbls 15.8 ppg 1.16 ft3/sx yld,Drop closing plug, Dowell pump 10.2 bbls H2O.Rig Displace with 5950 stks 11.1 ppg LSND. Initial 7-6 bpm @ 340-820 psi.Slow pumps last 10 bbls to 3 bpm @ 520 psi.Calculated 591 bbls to bump.Plug did not bump.Floats holding.Full returns.No reciprocation. 12/5/2015 12/5/2015 0.25 INTRM1 CEMENT OWFF T F/C on annulus(static)300 psi on 13,272.0 13,272.0 11:30 11:45 casing 12/5/2015 12/5/2015 0.25 INTRM1 CEMENT CMNT T Pump an additional 50 stks for 6000 13,272.0 13,272.0 11:45 12:00 stks total w/1.1 bpm @ 490 psi.Plugs did not bump.Floats holding 12/5/2015 12/5/2015 2.25 INTRM1 CEMENT RURD T Bleed off pressure.B/D cement lines. 0.0 0.0 12:00 14:15 R/D Volant.R/U swedge,valve& head pin&install on landing jt. Install 5"elevators.Bring cement head to rig floor. 12/5/2015 12/5/2015 5.25 INTRM1 CEMENT WOC T W.O.C.SIMOPS L/D 5"DP via 90' 0.0 0.0 14:15 19:30 mouse hole.(90 jts) 12/5/2015 12/5/2015 1.75 INTRM1 CEMENT PRTS T R/U cement hose to head pin on 7,355.0 7,355.0 19:30 21:15 landing jt.Pressure test lines to 4000 psi(good).Bleed off pressure from casing.Attempt to test casing&open stage collar.Pressure up to 500 psi/ 3.5 bbls,shut in and monitor for 3 min, slight decrease in pressure.Continue to increase pressure towards 1000 psi @ 770 psi/4.4 bbls started leaking off.Pumped an additional.6 bbls @ 750-740 psi,appear to be pushing fluid into formation.Stopped pumping. Pumped a total of.6 bbls past leak off point.Discuss plan forward with town and assume Wet Shoe. 12/5/2015 12/6/2015 2.75 INTRM1 CEMENT PULD P L/D 5"DP from derrick via 90'mouse 0.0 0.0 21:15 00:00 hole(66 jts)SIMOPS-Discuss plan forward on opening stage collar and performing 2nd stage cement job. 12/6/2015 12/6/2015 2.00 INTRM1 CEMENT PULD P L/D 5"DP from derrick via 90'mouse 0.0 0.0 00:00 02:00 hole(54 jts) 12/6/2015 12/6/2015 0.50 INTRM1 CEMENT RURD T R/D circ swedge from landing jt.R/D 0.0 0.0 02:00 02:30 circ hoses.Drop stage collar closing dart.L/D landing joint Page 11/24 Report Printed: 1/20/2016 D •erations Summary (with Timelog *the) a .ti;LL_.::__.:: .. CD5-09 C onocoPFrillops Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code lime P-T-X Operation (ftKB) End Depth(ftKB) 12/6/2015 12/6/2015 2.75 INTRM1 CEMENT WWSP T FMC attempt to pull wear ring. No 0.0 0.0 02:30 05:15 success.M/U completion spring lock wear ring puller.Pull wear ring (damaged).Set pack off&test to 5000 psi for 10 min(good) 12/6/2015 12/6/2015 2.50 INTRM1 CEMENT BOPE T C/O upper rams to 3 1/2"X 6"VBR's. 0.0 0.0 05:15 07:45 SIMOPS CIO saver sub to XT 39. Lubricate rig&choke manifold. 12/6/2015 12/6/2015 8.50 INTRM1 WHDBOP BOPE T BOPE Test:Test with 4"test joint, 0.0 0.0 07:45 16:15 Test Annular to 250/2,500 psi for 5 min,Test choke valves#1 -14 and needle valve to 250/3,500 psi for 5 min.HCR Choke and Kill,4"Demco, 5"FOSV,dart&needle valves,auto& manual IBOP(IBOP fail),HCR choke &kill,3 1/2"X 6"upper&lower VBR's, &blind rams to 250/3500 psi for 5 min. -(lower rams fail/pass).Koomey test; IP=3,100 psi,manifold press after close=1,550 psi,200 psi recovery 40 sec,full recovery 200 sec, N2-4 bottle average=1900 psi.Tested gas alarms.Draw down on man&super choke to 1,200 psi. - Witnessed waived by Chuck Sheave of the AOGCC. 12/6/2015 12/6/2015 0.50 INTRM1 WHDBOP RURD T R/D testing equip.B/D choke&kill 0.0 0.0 16:15 16:45 lines 12/6/2015 12/7/2015 7.25 INTRM1 WHDBOP RGRP T PJSM.CIO IBOP on top drive 0.0 0.0 16:45 00:00 12/7/2015 12/7/2015 1.50 INTRM1 WHDBOP RGRP 'T C/O IBOP on top drive 0.0 0.0 00:00 01:30 12/7/2015 12/7/2015 0.50 INTRM1 WHDBOP BOPE T Test IBOP to250/3500 psi for 5 min 0.0 0.0 01:30 02:00 (good).R/D testing equipment. 12/7/2015 12/7/2015 1.00 INTRM1 CEMENT RURD T Clean&clear floor.L/D tools via 0.0 0.0 02:00 03:00 beaver slide.R/U bell guide in top drive.FMC set 7.1875"ID wear ring. SIMOPS-PJSM on BHA 12/7/2015 12/7/2015 0.25 INTRM1 CEMENT BHAH T M/U 4 1/2"orange peel bomb chaser 0.0 0.0 03:00 03:15 BHA as per SLB 12/7/2015 12/7/2015 5.75 INTRM1 CEMENT PULD P RIH while P/U 4"14#DP to 4,927'.Fill 0.0 4,927.0 03:15 09:00 pipe every 20 stands 12/7/2015 12/7/2015 0.25 INTRM1 CEMENT RURD T R/D skate.SIMOPS-SLM pipe 4"DP 4,927.0 4,927.0 09:00 09:15 racked back in derrick 12/7/2015 12/7/2015 1.25 INTRMI CEMENT TRIP T RIH with 4"15.7#DP in derrick 4,927.0 7,310.0 09:15 10:30 f/4,927'to 7,310' 12/7/2015 12/7/2015 0.25 INTRM1 CEMENT TRIP T RIH f/7,310'to 7,355'&set stage 7,310.0 7,355.0 10:30 10:45 collar closing dart on seat w/3k wob. 12/7/2015 12/7/2015 0.75 INTRMI CEMENT CIRC T Circ&cond mud w/4-10 bpm @ 540 7,355.0 7,355.0 10:45 11:30 -1880 psi,50 rpm @6ktrq - 12/7/2015 12/7/2015 0.50 INTRMI CEMENT RURD T B/D top drive.R/U head pin&cement 7,355.0 7,355.0 11:30 12:00 hoses.Line up to take returns from lower annulus to pits.Flood lines.Shut upper pipe rams. 12/7/2015 12/7/2015 0.75 INTRMI CEMENT CIRC T Pressure up to 580 psi&shift stage 7,355.0 7,355.0 12:00 12:45 collar open.Establish circ w/2.5 bpm @ 250 psi.Pump 30 bbls total through stage collar up annulus. Page 12/24 Report Printed: 1/20/2016 11 0 operations Summary (with Timeloggpths) CD5-09 cot ConocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code lime P-T-X Operation (ftKB) End Depth(ftKB) 12/7/2015 12/7/2015 0.75 INTRM1 CEMENT RURD T B/D lines,R/D head pin&cement 7,355.0 7,355.0 12:45 13:30 hoses.Line up to u-tube IA&OA. SIMOPS F/C(static) 12/7/2015 12/7/2015 6.25 INTRM1 CEMENT TRIP T POOH f17,355'to surface 7,355.0 0.0 13:30 19:45 12/7/2015 12/7/2015 0.25 INTRM1 CEMENT -BHAH T LID BHA as per SLB 0.0 0.0 19:45 20:00 12/7/2015 12/7/2015 1.00 INTRM1 CEMENT BOPE T Clean&clear floor.FMC pull wear 0.0 0.0 20:00 21:00 ring.Line up to monitor well under blind rams.R/U testing equipment. 12/7/2015 12/7/2015 1.75 INTRM1 CEMENT BOPE T PJSM.C/O upper rams from 3 1/2" 0.0 0.0 21:00 22:45 VBR's to 7 5/8"casing rams.R/U testing equipment. 12/7/2015 12/8/2015 1.25 INTRM1 CEMENT BOPE T Attempt to test annular to 250/2500 0.0 0.0 22:45 00:00 psi.Unsuccessful.Trouble shoot. 12/8/2015 12/8/2015 1.25 INTRM1 CEMENT BOPE T Attempt to test annular to 250/2500 0.0 0.0 00:00 01:15 psi.Unsuccessful.Trouble shoot. Serviced HCR kill valve on BOPE stack. 12/8/2015 12/8/2015 1.00 INTRM1 CEMENT BOPE T Test BOPE w/7 5/8"test jt annular 0.0 0.0 01:15 02:15 250/2500 psi&upper rams 250/3500 psi&chart for 5 min.R/D testing equipment.Pull test plug 12/8/2015 12/8/2015 0.50 INTRM1 CEMENT WWSP T FMC pull pack off&L/D same.Install 0.0 0.0 02:15 02:45 7 5/8"landing joint. 12/8/2015 12/8/2015 0.50 INTRM1 CEMENT RURD T R/U cement head to landing joint.R/U 0.0 0.0 02:45 03:15 cement lines.(Verify closing plug in cement head) 12/8/2015 12/8/2015 4.75 INTRM1 CEMENT CIRC P Circ&cond mud for cement job. 7,355.0 7,355.0 03:15 08:00 Reduce mud wt to 10.5 ppg with+/-15 YP.Stage pumps 1.5-7 bpm @ 190- 390 psi.Full returns, 12/8/2015 12/8/2015 2.25 INTRM1 CEMENT CMNT P Cement 2nd stage cement job.Dowell 7,355.0 7,355.0 08:00 10:15 flood lines w/H20&pressure test to 3000 psi(good).Dowell pump 45.2 bbls 12.0 ppg Mud Push,Dowell pump 163.5 bbls 15.8 ppg 1.16 ft3/sx yld, Drop closing plug,Dowell pump 10.2 bbls H2O.Rig Displace with 3288 stks/327.64 bbls ppg LSND.Initial 7 bpm @ 200-950 psi.Slow pumps last 10 bbls to 4 bpm @ 770 psi.Bump plug&pressure up to 2000 psi(close stage collar @ 1670 psi)&hold for 10 min on chart.Bleed off pressure.F/C (static) 12/8/2015 12/8/2015 0.50 INTRM1 CEMENT RURD P B/D lines&R/D cement head.L/D 0.0 0.0 10:15 10:45 landing joint. 12/8/2015 12/8/2015 1.25 INTRMI CEMENT WWSP P P/U 4"test joint.FMC set pack off& 0.0 0.0 10:45 12:00 test to 5000 psi for 10 min(good) SIMOPS-C/O handling equipment to 5" 12/8/2015 12/8/2015 4.50 INTRM1 CEMENT PULD P L/D 5"DP from derrick via 90'mouse 0.0 0.0 12:00 16:30 hole(18 jts HWDP&99 jts 5"NC 50) SIMOPS-C/O upper rams to 3 1/2"X 6"VBR's 12/8/2015 12/8/2015 0.50 INTRMI CEMENT SVRG P Servic rig,top drive&draw works. 0.0 0.0 16:30 17:00 12/8/2015 12/8/2015 1.00 INTRM1 CEMENT RGRP T Repair iron roughneck.(replace 0.0 0.0 17:00 18:00 motor) Page 13/24 Report Printed: 1/20/2016 1 ;0 *rations Summary (with Timelog Sths) CD5-09 (onrocoPhillips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/8/2015 12/8/2015 1.00 INTRM1 CEMENT PULD P UD 5"DP from derrick via 90'mouse 0.0 0.0 18:00 19:00 hole(24 jts 5"NC 50) 12/8/2015 12/8/2015 1.75 INTRM1 CEMENT BOPE P Set upper test,R/U test equipment. 0.0 0.0 19:00 20:45 Test upper rams 250/3500 psi for 5 min(good).RID testing equipment& pull test plug. 12/8/2015 12/8/2015 1.25 INTRM1 CEMENT BHAH T M/U 6 1/2"clean out BHA as per SLB 0.0 192.0 20:45 22:00 to 192' 12/8/2015 12/9/2015 2.00 INTRM1 CEMENT PULD P RIH 6 1/2"clean out BHA while 192.0 1,988.0 22:00 00:00 picking up 4"14#DP from pipe shed to f/192'to 1,988'.SIMOPS-AD LOT on OA 12/9/2015 12/9/2015 2.75 INTRM1 CEMENT PULD P RIH while picking up 4"14#DP from 1,988.0 4,069.0 00:00 02:45 pipe shed to f/1,988'to 4,069'. SIMOPS-AD LOT,300 bbl H2O flush,&86 bbls Freeze Protect on 10 3/4"x 7 5/8"OA 12/9/2015 12/9/2015 1.50 INTRM1 CEMENT TRIP T RIH w/4"14#DP from derrick f/4,069' 4,069.0 7,191.0 02:45 04:15 to 7,191' 12/9/2015 12/9/2015 0.50 INTRM1 CEMENT CIRC T Circ&cond mud w/300 gpm @ 1500 7,191.0 7,286.0 04:15 04:45 psi,50 rpm @ 6.5 k trq.SIMOPS- PJSM on slip&cut 12/9/2015 12/9/2015 1.00 INTRM1 CEMENT SLPC T Slip&cut 75'drill line 7,286.0 7,286.0 04:45 05:45 12/9/2015 12/9/2015 0.50 INTRM1 CEMENT SVRG T Service rig&draw works. 7,286.0 7,286.0 05:45 06:15 12/9/2015 12/9/2015 0.25 INTRM1 CEMENT COCF P W&R w/160 gpm @ 620 psi,50 rpm 7,286.0 7,349.0 06:15 06:30 @ 6.5 k trq.f/7,286'to TOC 7,349' 12/9/2015 12/9/2015 1.75 INTRM1 CEMENT DRLG P Drill cement,closing plug&stage 7,349.0 7,665.0 06:30 08:15 collar f/7,349'to 7,665'w/160-250 gpm @620-970 psi,50 rpm 6.5-10 k trq.(Stage collar 7,355'to 7,358') 12/9/2015 12/9/2015 0.75 INTRM1 CEMENT TRIP T RIH w/4"14#DP from derrick f/7,665' 7,665.0 8,990.0 08:15 09:00 to 8,990' 12/9/2015 12/9/2015 2.25 INTRM1 CEMENT PULD P RIH while picking up 4"15.7#DP from 8,990.0 11,086.0 09:00 11:15 pipe shed to f/8,990'to 11,086' 12/9/2015 12/9/2015 1.75 INTRM1 CEMENT TRIP T RIH w/4"15.7#DP from derrick 11,086.0 13,101.0 11:15 13:00 f/11,086'to 13,101' 12/9/2015 12/9/2015 0.50 INTRM1 CEMENT RURD P R/U head pin&circ hoses.R/U testing 13,101.0 13,101.0 13:00 13:30 equip.Break circ&fill pipe 12/9/2015 12/9/2015 0.75 INTRMI CEMENT PRTS P Attempt to pressure test casing with 13,101.0 13,101.0 13:30 14:15 no success.Test#1 -60 stks @ 2550 psi bleeding off. 12/9/2015 12/9/2015 2.00 INTRMI CEMENT 'PRTS T Attempt to test casing 2 more times 13,101.0 13,101.0 14:15 16:15 with no success.Test#2-59 stks @ 2590 psi bleeding off,Test#3-25 stks @ 1000 psi bleeding off. 12/9/2015 12/9/2015 0.50 INTRM1 CEMENT RURD P R/D testing equip&circ hoses.B/D 13,101.0 7,665.0 16:15 16:45 lines 12/9/2015 12/9/2015 4.25 INTRM1 CEMENT DRLG P Drill cement,shoe track,&rat hole 13,101.0 13,283.0 16:45 21:00 f/13,101'to 13,283'w/150-235 gpm @960-1400 psi,50-80 rpm @13- 16 k trq.(baffle collar 13,139',float collar 13,183',&shoe 13,272') 12/9/2015 12/9/2015 0.75 INTRM1 CEMENT DDRL P Drill 20'new hole f/13,283'to 13,303' 13,283.0 13,303.0 21:00 21:45 MD/7,420'TCD ADT.67 hrs,235 gpm 1420 psi,PU wt 235 k,SO wt 118 k,ROT 155 k,80 rpm, 16/15 k trq. Page 14/24 Report Printed: 1/20/2016 • 01 •perations Summary (with Timelog•pths) o CD5-09 C_onocoPhithps rt fr,A.� Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/9/2015 12/9/2015 0.25 INTRM1 CEMENT BKRM P BROOH f/13,303'to 13,246'w/235 13,303.0 13,246.0 21:45 22:00 gpm @ 1410 psi,80 rpm @ 16 k trq 12/9/2015 12/10/2015 2.00 INTRM1 CEMENT CIRC P SPR's.Circ&cond mud for FIT/LOT 13,246.0 13,246.0 22:00 00:00 w/235 gpm @ 1460 psi,80 rpm @ 15 k trq,Mud wt 10.7 ppg In/Out 12/10/2015 12/10/2015 0.75 INTRM1 CEMENT CIRC P Circ&cond mud for FIT/LOT w/235 13,246.0 13,246.0 00:00 00:45 gpm @ 1450 psi,80 rpm @ 15.5 k trq, Mud wt 10.7 ppg In/Out 12/10/2015 12/10/2015 1.00 INTRMI CEMENT FIT P R/U head pin&circ hose.FIT to 12.5 13,246.0 13,246.0 00:45 01:45 ppg©695 psi.Shut in&monitor for 15 min.Initial shut in pressure 660 psi &final shut in pressure 555 psi for 12.13 ppg EMW.F/C(static) 12/10/2015 12/10/2015 1.25 INTRM1 CEMENT 'TRIP T POOH f/13,246'to 12,325'.Hole 13,246.0 12,325.0 01:45 03:00 taking proper fill. 12/10/2015 12/10/2015 0.25 INTRM1 CEMENT CIRC T R/U head pin&circ hose&pump 20 12,325.0 12,325.0 03:00 03:15 bbls 11.7 ppg dry job 12/10/2015 12/10/2015 6.75 INTRMI CEMENT TRIP T POOH f/12,325'to surface.Rack back 12,325.0 0.0 03:15 10:00 HWDP&jars. 12/10/2015 12/10/2015 0.75 INTRMI CEMENT BHAH T L/D 6 1/2"clean out BHA&M/U Baker 0.0 0.0 10:00 10:45 "G"RBP test packer. 12/10/2015 12/10/2015 10.00 INTRM1 CEMENT TRIP T RIH w/Baker G plug to 12,840' 0.0 12,840.0 10:45 20:45 P/U wt 250 k,SO wt 115 k,ROT wt 155 k Calc Disp=76.88 bbls/Act Disp 76.5 bbls ` 12/10/2015 12/10/2015 1.25INTRM1 CEMENT MPSP T Set G packer as per Baker rep&un- 12,825.0 12,825.0 20:45 22:00 sting.Rotate to right 14 wraps&set packer.PU to 275 k,SO to 80 k, confirm packer set.Rotate 6 wraps to left&un-sting from packer.L/D single jt to 12,825' Packer @ 12,840' 12/10/2015 12/11/2015 2.00 INTRM1 CEMENT PRTS T R/U TIW,head pin&circ hoses. 12,825.0 12,825.0 22:00 00:00 Pressure test casing to 3500 psi for 30 min(good).(@ 51 strokes 2240 psi pressure dropped to 1470 psi& stabilized.Monitor pressure for 5 min stabile,Increase pressure to 3560 psi &shut in for 30 min)There was a 200 psi difference from chart recorder&all surface pressure gauges.Surface gauges reading 3500 psi&chart recorder reading 3300 psi.Decision made to re-test casing. 12/11/2015 12/11/2015 1.25 INTRM1 CEMENT PRTS T Pressure test casing to 3500 psi for 30 12,825.0 12,825.0 00:00 01:15 min(good).R/D testing equipment. 12/11/2015 12/11/2015 0.75 INTRM1 CEMENT MPSP T RIH to f/12,825'to 12,890'.(Packer 12,825.0 12,890.0 01:15 02:00 not @ setting depth of 12,840',shifted 50'down hole to 12,890'during first casing test)Engage packer&confirm latch up.Rotate 17 wraps to right and release packer. 12/11/2015 12/11/2015 0.25 INTRM1 CEMENT OWFF T F/C(static) 12,890.0 12,890.0 02:00 02:15 Page 15/24 Report Printed: 1/20/2016 0;-- I ' •rations Summary ( g [� with Timeloths) CD5-09 ConocoPhiilips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End lime Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/11/2015 12/11/2015 10.25 INTRM1 CEMENT TRIP T POOH f/12,890'to surface.SIMOPS- 12,890.0 0.0 02:15 12:30 Test choke valves#1 -14 and needle valve,HCR/Man Kill to 250/3,500 psi for 5 min.Draw down on super choke to 1100 psi 12/11/2015 12/11/2015 0.25 INTRM1 CEMENT BHAH T UD G packer BHA as per Baker rep. 0.0 0.0 12:30 12:45 Clac Fill 76.18 bbls/Act Fill 78 bbls 12/11/2015 12/11/2015 1.00 INTRM1 WHDBOP RURD P FMC pull wear ring&set test plug. 0.0 0.0 12:45 13:45 R/U testing equipment.Fill stack w/H20&flood Lines.SIMOPS-Bring to rig floor 2 4"MPD bearings 12/11/2015 12/11/2015 3.25 INTRM1 WHDBOP BOPE P BOPE Test:Test with 3 1/2"&4 1/2" 0.0 0.0 13:45 17:00 test joints,Test Annular to 250/2,500 psi for 5 min,Test 4"Demco,FOSV, dart&needle valves,auto&manual IBOP,HCR choke&kill,3 1/2"X 6" upper&lower VBR's,&blind rams to 250/3500 psi for 5 min.Koomey test; IP=3,100 psi,manifold press after close=1,550 psi,200 psi recovery 34 sec,full recovery 205 sec, N2-4 bottle average=1900 psi.Witnessed waived by Bob Noble of the AOGCC. 12/11/2015 12/11/2015 0.50 INTRM1 WHDBOP RURD 'P R/D testing equipment.B/D lines. 0.0 0.0 17:00 17:30 FMC pull test plug&set 7 1/8"wear ring. 12/11/2015 12/11/2015 1.00 INTRM1 CEMENT MPDA P Stab 2 MPD bearings on stands of 4" 0.0 0.0 17:30 18:30 15.7#BP&rack back in derrick 12/11/2015 12/11/2015 0.25 INTRM1 CEMENT RURD P FMC set 7 1/8"wear ring. 0.0 0.0 18:30 18:45 12/11/2015 12/11/2015 1.75 INTRM1 CEMENT BHAH P PJSM.M/U 6 1/2"production BHA#7 0.0 368.0 18:45 20:30 as per SLB to 368' 12/11/2015 12/11/2015 1.25-INTRM1 CEMENT TRIP P RIH w/BHA#7 f/368'to 2,259' 368.0 2,259.0 20:30 21:45 12/11/2015 12/11/2015 0.50 INTRMI CEMENT -DHEQ P Shallow hole test MWD w/220 gpm @ 2,259.0 2,259.0 21:45 22:15 1200 psi 12/11/2015 12/12/2015 1.75 INTRM1 CEMENT TRIP T RIH w/BHA#7 f/2,259'to 4,529'Fill 2,259.0 4,529.0 22:15 00:00 pipe every 20 stands w/fill up hose. 12/12/2015 12/12/2015 5.50 INTRM1 CEMENT TRIP T RIH f/4,529'to 13,168'Fill pipe every 4,529.0 13,168.0 00:00 05:30 20 stands w/fill up hose. 12/12/2015 12/12/2015 1.75 INTRM1 CEMENT CIRC P Circ&cond mud w/230 gpm @ 2020 13,168.0 13,168.0 05:30 07:15 psi.Mud aired up,with no gas 12/12/2015 12/12/2015 0.25 INTRM1 CEMENT OWFF 'P F/C(slight ooze)B/D top drive 13,168.0 13,168.0 07:15 07:30 12/12/2015 12/12/2015 1.00 INTRM1 CEMENT MPDA 'P Pull trip nipple&install MPD bearing. 13,168.0 13,263.0 07:30 08:30 Break in MPD equipment w/30-50 rpm,2 bpm @ 560 psi f/13,168'to 13,263'.SIMOPS-PJSM on Cut& slip drill line 12/12/2015 12/12/2015 1.00 INTRMI CEMENT SLPC P Slip&cut 60'drill line. 13,263.0 13,263.0 08:30 09:30 12/12/2015 12/12/2015 0.75 INTRM1 CEMENT REAM P W&R f/13,263'to 13,303'w/240 gpm 13,263.0 13,303.0 09:30 10:15 @ 2230 psi,80 rpm 16.5 k trq. Downlink to power dive.SIMOPS- PJSM on Displacement. Page 16124 Report Printed: 1/20/2016 •perations Summary (with Timelogtpths) oil CD5-09 ConocoPhieips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/12/2015 12/12/2015 1.00 PROD1 DRILL DDRL P Drill ahead f/13,303'to 13,359'MD/ 13,303.0 13,359.0 10:15 11:15 7,425'TVD,ADT 0,91 hrs,ECD 10.87 ppg,230 gpm,2190 psi,PU 255,SO 120,ROT 165,80 rpm 17/16.5 k trq, 10/12 wob Displace from 10.7 ppg LSND to 9.0 ppg FloPro on the fly. 12/12/2015 12/12/2015 0.75 PROD1 DRILL DISP P Finish displacing to 9.0 ppg FloPro 13,359.0 13,262.0 11:15 12:00 w/230 gpm 2190-1980 psi,80 rpm @ 17 k trq.BROOH f/13,359'to 13,262 12/12/2015 12/12/2015 0.50 PROD1 DRILL OWFF P Close MPD chokes&monitor psi.(No 13,262.0 13,262.0 12:00 12:30 increase in psi) 12/12/2015 12/12/2015 0.50 PROD1 DRILL REAM P W&R f/13,262'to 13,359'w/155 gpm 13,262.0 13,359.0 12:30 13:00 @ 1050 psi,80 rpm 16.5 k trq. 12/12/2015 12/13/2015 11.00 PROD1 DRILL DDRL P Drill ahead f/13,359'to 14,210'MD/ 13,359.0 14,210.0 13:00 00:00 7,409'TVD,ADT 8.23 hrs,ECD 10.36 ppg,230 gpm,2060 psi,PU 275,SO 100,ROT 162, 150 rpm, 19.3/18.2 k trq,6/10 wob 12/13/2015 12/13/2015 12.00 PROD1 DRILL DDRL P Drill ahead f/14,210'to 15,560'MD/ 14,210.0 15,560.0 00:00 12:00 7,391'TVD,ADT 9.17 hrs,ECD 10.74 ppg,250 gpm,2500 psi,PU 300,SO 110,ROT 170, 150 rpm,21/20 k trq, 4/8 wob 12/13/2015 12/14/2015 12.00 PROD1 DRILL DDRL P Drill ahead f/15,560'to 16,718'MD/ 15,560.0 16,718.0 12:00 00:00 7,412'TVD,ADT 8.63 hrs,ECD 11.03 ppg,260 gpm,2970 psi,PU 225,SO 130,ROT 170, 150 rpm,15/9 k trq, 15 wob 12/14/2015 12/14/2015 2.25 PROD1 DRILL DDRL P Drill ahead f/16,718'to 16,932'MD/ 16,718.0 16,932.0 00:00 02:15 7,403'TVD,ADT 1.67 hrs,ECD 11.09 ppg,260 gpm,2970 psi,PU 225,SO 130,ROT 170, 150 rpm,15/9 k trq, 10 wob 12/14/2015 12/14/2015 0.50 PROD1 'DRILL CIRC T Circ&cond.w/260 gpm @ 2980 psi, 16,932.0 16,897.0 02:15 02:45 150 rpm @ 10.5 k trq F/16,932'to 16,897'.SIMOPS-PJSM on MPD bearing,prep tools&equipment. 12/14/2015 12/14/2015 0.25 PROD1 DRILL OWFF T F/C(static) 16,897.0 16,897.0 02:45 03:00 12/14/2015 12/14/2015 0.75 PROD1 DRILL MPDA T C/O MPD bearing.Break in new 16,897.0 16,932.0 03:00 03:45 bearing f/16,897'to 16,932' 12/14/2015 12/14/2015 8.25 PROD1 DRILL DDRL P Drill ahead(/16,932'to 17,695'MD/ 16,932.0 17,695.0 03:45 12:00 7,379'TVD,ADT 6.65 hrs,ECD 11.28 ppg,250 gpm,2910 psi,PU 225,SO 125,ROT 170, 150 rpm,15/10.5 k trq, 10 wob 12/14/2015 12/15/2015 12.00 PROD1 DRILL DDRL P Drill ahead f/17,695'to 18,732'MD/ 17,695.0 18,732.0 12:00 00:00 7,388'TVD,ADT 7.48 hrs,ECD 11.18 ppg,260 gpm,3000 psi,PU 225,SO 120,ROT 165, 150 rpm,15.41/9.5 k trq, 10 wob 12/15/2015 12/15/2015 12.00 PROD1 DRILL DDRL P Drill ahead f/18,732'to 20,122'MD/ 18,732.0 20,122.0 00:00 12:00 7,345'TVD,ADT 9.19 hrs,ECD 11.44 ppg,260 gpm,3120 psi,PU 225,SO 105,ROT 167, 150 rpm,15/11.5 k trq, 10 wob Page 17/24 Report Printed: 1/20/2016 1 , "'orations Summary (with Timelog Sths) T\ CD5-09 Conoco PhiiIips P L.,,I Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/15/2015 12/15/2015 2.50 PROD1 DRILL DDRL P Drill ahead f/20,122'20,370'MD/ 20,122.0 20,370.0 12:00 14:30 7,351'TVD,ADT 1.5 hrs,ECD 11.35 ppg,260 gpm,3120 psi,PU 225,SO 105,ROT 167,150 rpm,15/11.5 k trq, 10 wob 12/15/2015 12/16/2015 9.50-PROD1 DRILL DDRL X Drill ahead f/20,370'to 21,289'MD/ 20,370.0 21,289.0 14:30 00:00 7,356'TVD,ADT 6.86 hrs,ECD 11.05 ppg,260 gpm,3040 psi,PU 225,SO N/A,ROT 170, 150 rpm,12.5/8.8 k trq, 10 wob 12/16/2015 12/16/2015 12.00 PROD1 DRILL DDRL X Drill ahead from 21,289'to 22,410 21,289.0 22,410.0 00:00 12:00 and/7,351'tvd,ADT 8.65 hrs, ECD 11.4 ppg,230 gpm,2,990 psi,PU= 235,SO=118,ROT 175K Ib, 150 rpm, 14.7/9.0K trq,13K lb WOB 12/16/2015 12/17/2015 12.00 PROD1 DRILL DDRL X Drill ahead from 22,410'to 23,282 22,410.0 23,282.0 12:00 00:00 and/7,319'tvd, ADT:8.7 hrs,ECD 11.27 ppg,260 gpm,3,440 psi,PU= 228,SO=114,ROT 165K Ib, 150 rpm, 13.6/9.2K trq,9.5K Ib WOB SPRs-22,296'md,19:20 hrs MP#1: 15-890,25-1,070 MP#2: 15-920,40-1,200 12/17/2015 12/17/2015 1.00 PROD1 DRILL DDRL X Drill ahead from 23,282'to 23,381 23,282.0 23,381.0 00:00 01:00 and/7,330'tvd, ADT:0.74 hrs,ECD 11.5 ppg,250 gpm,3,460 psi,PU= • 235,SO=118,ROT=167K lb, 120 rpm, 12.0/10.7K trq,7K lb WOB 12/17/2015 12/17/2015 2.25 PROD1 CASING CIRC P CBU 1X with 250 gpm,3,330-3,220 23,381.0 23,381.0 01:00 03:15 psi,ECD=11.57-11.20, 150 rpm, 11.5K TQ.Blow down TD with MPD choke open. PU=230K(pumps on),SO=125K (pumps off). 12/17/2015 12/17/2015 0.25 PROD1 CASING OWFF P Close MPD choke and Orbit valve and 23,381.0 23,381.0 03:15 03:30 monitor annulus pressure build up while rotating 10 rpm, 10K TQ. Initial pressure=final pressure=1 psi. Bleed off pressure. 12/17/2015 12/17/2015 7.00 PROD1 CASING CIRC P CBU 4X with 275 gpm,3,920 psi, 150 23,381.0 23,377.0 03:30 10:30 rpm, 11K TQ while reciprocating drill string 30'. PJSM for brine displacement. PU=230K(pumps on),SO=125K (pumps off). SPRs-23,370'md,13:00 hrs MP#1: 15-320,25-580 MP#2: 15-320,40-540 12/17/2015 12/17/2015 0.50 PROD1 CASING OWFF P Flo-chk with 6 rpm, 10K TQ for 10 min 23,377.0 23,377.0 10:30 11:00 -static. Blow down TD and drop 2.0625"hollow drift down drill string. 12/17/2015 12/17/2015 3.00 PROD1 CASING DISP P Displace 9.0 ppg Flo-Pro mud from 23,377.0 23,377.0 11:00 14:00 well with 39 bbl Hi-Vis spacer followed by 625 bbl of 9.5 ppg NaCI/NaBr (diluted)brine with 3%MI-776 lubricant at 275 gpm,3,480-3,100 psi,150 rpm and 11-10K TQ. Page 18/24 Report Printed: 1/20/2016 Oki: • •perations Summary (with Timelog Depths) CD5-09 Conocophillaps Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/17/2015 12/17/2015 1.75 PROD1 CASING TRIP P Strip-OOH from 23,337'to 22,115' 23,337.0 22,090.0 14:00 15:45 following trip schedule and holding back pressure with MPD(200 psi tripping and at connections). Encountered tight spot at 22,115'and 22,090'with 25K lb over pull. Worked thru tight spot 3X with 25K over pull 12/17/2015 12/17/2015 0.25 PROD1 CASING TRIP T RIH below tight spots, from 22,090'to 22,090.0 22,424.0 15:45 16:00 22,424'md. 12/17/2015 12/17/2015 2.25 PROD1 CASING CIRC T CBU 1X with 270 gpm,2,850 psi, 150 22,424.0 22,424.0 16:00 18:15 rpm, 13K TQ while reciprocating drill string 30'. PU=245K,S0=135K lb. 12/17/2015 12/17/2015 0.50 PROD1 CASING TRIP T Strip-OOH from 22,424'to 22,135' 22,424.0 22,424.0 18:15 18:45 following trip schedule and holding back pressure with MPD(200 psi tripping and at connections). Worked thru tight spots 2X with 25K lb OP. 12/17/2015 12/17/2015 0.50 PROD1 CASING BKRM T Make up to TD and BROOH thru tight 22,424.0 22,040.0 18:45 19:15 spots staging up to 270 gpm,2,850 s psi, 150 rpm and 13K TQ. Over pull thru tight spots while BROOH was 5K lb. 12/17/2015 12/17/2015 0.25 PROD1 CASING TRIP T Shut down pumps RIH to 22,135'and 22,424.0 22,042.0 19:15 19:30 pull thru tight spots to 22,040'with out over pull. 12/17/2015 12/18/2015 4.50 PROD1 CASING TRIP P Strip-OOH from 22,042'to 18,231' 22,042.0 18,231.0 19:30 00:00 following trip schedule and holding back pressure with MPD(200 psi tripping and at connections). 12/18/2015 12/18/2015 5.75 PROD1 CASING TRIP P Continue to strip-OOH from 18,231'to 18,231.0 13,263.0 00:00 05:45 13,263'following trip schedule and holding back pressure with MPD(180 psi tripping and at connections). 12/18/2015 12/18/2015 1.25 PROD1 CASING CIRC P CBU 1X at 7-5/8"csg shoe with 275 13,263.0 13,263.0 05:45 07:00 gpm, 1,920-1,860 psi, 120 rpm,6- 4.5K TQ'. PU=210K,SO=130,ROT= 165K lb. 12/18/2015 12/18/2015 0.50 PROD1 CASING OWFF P Flow chk for 30 min.-static 13,263.0 13,263.0 07:00 07:30 12/18/2015 12/18/2015 0.25 PROD1 CASING CIRC P Pump 36 bbl dry job.Blow down TD. 13,263.0 13,263.0 07:30 07:45 12/18/2015 12/18/2015 1.25 PROD1 CASING TRIP P Continue to strip-OOH from 13,263'to 13,263.0' 11,739.0 07:45 09:00 11,739' following trip schedule. MPD element failed. PU=200,SO=137K lb. 12/18/2015 12/18/2015 1.00 PROD1 CASING MPDA T Change out MPD element.(LD stand 11,739.0 11,739.0 09:00 10:00 #120 due to breakout torque=38K ft- Ib). 12/18/2015 12/18/2015 1.00 PROD1 CASING TRIP P Continue to strip-OOH from 11,739'to 11,739.0 10,023.0 10:00 11:00 10,023' following trip schedule and racking back DP in derrick(140 stds total). 12/18/2015 12/18/2015 4.00 PROD1 CASING PULD P Continue to strip-OOH from 11,739'to 10,023.0 5,996.0 11:00 15:00 5,996' following trip schedule and laying down 4"DP. 12/18/2015 12/18/2015 0.25 PROD1 CASING OWFF P Shut down pump,line up MPD and flo- 5,996.0 5,996.0 15:00 15:15 chk for 10 min.-static. Page 19/24 Report Printed: 1/20/2016 1 ; ; iterations Summary (with Timelog Sths) 0a - - CD5-09 ConocoPhitlips hF la Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/18/2015 12/18/2015 5.75 PROD1 CASING PULD P Continue to strip-OOH from 10,023 to 5,996.0 463.0 15:15 21:00 BHA at 463' laying down 4"DP. 12/18/2015 12/18/2015 1.25 PROD1 CASING MPDA P Stand back 4"HWDP in BHA. Blow 463.0 368.0 21:00 22:15 down lines and choke and flush with 20 bbl of water.Pull MPD element and stand back one stand in the derrick with the element,to 368'. Install Trip nipple on stack. 12/18/2015 12/19/2015 1.75 PROD1 CASING BHAH P PJSM. LD BHA#7. Actual/Calc fill= 368.0 0.0 22:15 00:00 286/158 bbl. (currently avg 1.5-1.0 bbl/hr losses with 9.5 ppg viscosified brine,without pumping). Kick while tripping drill-CRT=107 sec 12/19/2015 12/19/2015 0.25 PROD1 CASING BHAH P Continue to LD BHA#7. 0.0 0.0 00:00 00:15 12/19/2015 12/19/2015 0.50 PROD1 CASING BHAH P Clear and clean rig floor,LD BHA#7. 0.0 0.0 00:15 00:45 12/19/2015 12/19/2015 1.50 COMPZN CASING RURD P RU 4-1/2"casing equip. 0.0 0.0 00:45 02:15 12/19/2015 12/19/2015 0.25 COMPZN CASING SFTY P PJSM for running 4-1/2"liner 0.0 0.0 02:15 02:30 12/19/2015 12/19/2015 10.25 COMPZN -CASING PUTB P Run 4-1/2"Orange peel bull nose, 0.0 7,224.0 02:30 12:45 perforated pup jt with 36 x 0.5"holes, 4-1/2", 12.6 lb/ft,L-80,R3 IBTM solid (140 jts), Frac sleeves with actuation ball sizes(1.813", 1.75",1.688", 1.625", 1.563"-top to btm order)-4- 1/2", 12.6 lb/ft,L-80,R2,IBTM solid (29 jts),Frac sleeves with actuation ball sizes(1.875")followed by 4-1/2" sliding sleeve with 2.75""D"profile- open down. Make up IBTM liner with 2,800 ft-lb torque with Run and Seal thread dope. 12/19/2015 12/19/2015 3.50 COMPZN CASING PUTB X Continue to sun 4-1/2", 12.6 Ib/ft,L-80, 7,224.0 10,224.0 12:45 16:15 R2,IBTM solid(98 jts),Frac sleeves with actuation ball sizes(2.125", 2.063",2.000",1.938"-top to btm order)followed by 4-1/2"sliding sleeve with 2.75""D"profile-open down. Make up IBTM liner with 2,800 ft-lb torque with Run and Seal thread dope. Note:Actual TD of well was 3,000' deeper than planned. 12/19/2015 12/19/2015 1.25 COMPZN CASING OTHR P MU"DG"Flex-Lock liner 10,224.0 10,272.0 16:15 17:30 hanger/HRDE ZXP packer assembly and running tool.Mix&pour pal mix. MU XO to 1 stand 4"DP to 10,272'. SIMOPs-C/O elevators to 4"DP elevators. Break circ and circ liner volume with 1- 3 bpm,140-265 psi. Blow down TD. PU=148K, S0=112K lb 12/19/2015 12/19/2015 4.00 COMPZN CASING RUNL P RIH with 4-1/2"liner on 4"DP from 10,272.0 13,250.0 17:30 21:30 10,272'to 13,230' PU=132K, S0=175K lb Page 20/24 Report Printed: 1/20/2016 11 0 operations Summary (with Timelog Depths) CD5-09 ConocoPhilhps Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/19/2015 12/20/2015 2.50 COMPZN CASING RUNL P Continue to RIH with 4-1/2"liner on 4" 13,250.0 17,520.0 21:30 00:00 DP,in open hole from 13,250'to 17520' 12/20/2015 12/20/2015 4.25 COMPZN CASING RUNL P Continue to RIH with 4-1/2"liner on 4" 17,520.0 23,381.0 00:00 04:15 DP,in open hole from 17,520'to 23,381'. Calc/Actual=138.8/88.5 bbl 12/20/2015 12/20/2015 0.25 COMPZN CASING HOSO P Tag up at 23,381'md,PU to break 23,381.0 23,371.0 04:15 04:30 over tension of 250K lb and PU 10'off bottom to 23,371'md. PU=250K,SO=140K lb 12/20/2015 12/20/2015 0.25 COMPZN CASING CIRC P Break circulation and stage pumps to 23,371.0 23,371.0 04:30 04:45 2 bpm,390 psi.PJSM on displacement 12/20/2015 12/20/2015 4.75 COMPZN CASING DISP P Displace well to 9.5 ppg non- 23,371.0 23,371.0 04:45 09:30 viscosified brine:Pump 40 bbls high vis spacer,followed by 900 bbls 9.5 ppg brine at 3-6 bpm,640-2,100 psi. 12/20/2015 12/20/2015 1.25 COMPZN CASING PACK P Break connection,drop 1.5"ball. 23,371.0 13,097.0 09:30 10:45 Screw back in and place string in tension with PU=250K.Pump ball down with 3-1.5 bpm,530-100 psi, ball went on seat and pressured up to 4,000 psi.Held pressure for 2 min, slacked off from 250K to 170K Ib,set hanger and release from running tool. Hold pressure for 5 minutes,bleed off to 0 psi. PU with 222K lb string weight (23K lb decrease)and continue to PU 6'verifying released from hanger and exposing dog sub.Slackoff with 50K lb and set liner top HRD-E ZXP packer. PU to 222K string weight,rotate down at 5 rpm while slacking off with 50K lb verifying set.TOL at 13,097'and 12/20/2015 12/20/2015 0.50 COMPZN CASING PRTS P Blow down TD and RU head pin and 13,097.0 13,097.0 10:45 11:15 lines. Pressure test ZXP liner top packer to 2,000 psi for 10 min.,chart and record-good.RD testing equip. 12/20/2015 12/20/2015 0.50 COMPZN WELLPR OWFF P POOH and stand back 4"DP to 13,097.0 12,995.0 11:15 11:45 12,955'md. Flow check-slight drop in fluid level. PJSM for slip&cut DL. 12/20/2015 12/20/2015 1.00 COMPZN WELLPR SLPC P PJSM.Slip&cut 68'drill line while 12,995.0 12,995.0 11:45 12:45 monitoring well. SIMOPs:Blow down and secure MPD equip for rig move. 12/20/2015 12/20/2015 1.25 COMPZN WELLPR SVRG P Service TD,Iron rough neck and 12,995.0 12,995.0 12:45 14:00 drawworks while monitoring hole. (Loss while monitoring=7 bbl/hr). 12/20/2015 12/20/2015 0.25 COMPZN WELLPR PULD P POOH from 12,995 to 12,835'laying 12,995.0 12,835.0 14:00 14:15 down 4", 15.7 lb/ft DP. 12/20/2015 12/20/2015 2.25 COMPZN WELLPR PULD P POOH from 12,835'to 10,726'laying 12,835.0 10,726.0 14:15 16:30 down 4"HWDP. 12/20/2015 12/20/2015 1.50 COMPZN WELLPR TRIP P POOH from 10,726'to 8,157'racking 10,726.0 8,157.0 16:30 18:00 back 26 stds of 4", 15.7 lb/ft DP. 12/20/2015 12/21/2015 6.00 COMPZN WELLPR PULD P POOH from 8,157'to 2,090'laying 8,157.0 2,090.0 18:00 00:00 down 4", 15.7 lb/ft DP. Page 21124 Report Printed: 1/20/2016 0q •erations Summary (with Timelog laths) CD5-09 Coma:Whinlips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/21/2015 12/21/2015 2.25 COMPZN WELLPR PULD P Continue to POOH from 2,090'to 60' 2,090.0 60.0 00:00 02:15 laying down 4",15.7 lb/ft DP. Calc/Actual hole fill(for trip)=92.62/ 184 bbl 12/21/2015 12/21/20151.25 COMPZN WELLPR BHAH P POOH from 60',inspecting and laying 60.0 0.0 02:15 03:30 down liner running tool.Clean and clear rig floor while monitoring well on the Trip tank.. 12/21/2015 12/21/2015 0.50 COMPZN RPCOMP RURD P Pull wear ring and set 9"ID, 0.0 0.0 03:30 04:00 retrievable completion wear ring. 12/21/2015 12/21/2015 1.00 COMPZN RPCOMP MPDA P Strip MPD element off 4"DP stand, 0.0 0.0 04:00 05:00 stood back in the derrick and LD. 12/21/2015 12/21/2015 2.00 COMPZN RPCOMP RURD P PU tools and equipment to run 0.0 0.0 05:00 07:00 completion(sheaves,I-Wire,cannon clamps,dbl stacked tongs).RU sheaves.Change out handling equipment.RU power tongs.(monitor well on Trip tank. 12/21/2015 12/21/2015 5.00 COMPZN RPCOMP PUTB P PJSM.Run 3-1/2"upper completion 0.0 1,249.0 07:00 12:00 as per detail to 1,249'.MU I-Wire and test to 5,000 psi for 10 min(good). PU=SO=75K lb. 12/21/2015 12/22/2015 12.00 COMPZN RPCOMP PUTB P Continue to run 3-1/2"upper 1,249.0 7,130.0 12:00 00:00 completion as per detail from 1,249'to 7,130'(Test I-Wire every 30 jts') PU= 90K lb. 12/22/2015 12/22/2015 12.50 COMPZN RPCOMP PUTB P Continue to run 3-1/2"upper 7,130.0 13,097.0 00:00 12:30 completion as per detail from 7,130'to 13,097'(Test I-Wire every 30 jts') SO=100K lb. Calc/Actual fill=111 bbl/150 bbl 12/22/2015 12/22/2015 0.50 COMPZN RPCOMP HOSO P RIH from 13,097'to 13,119'. Tag top 13,097.0 13,094.0 12:30 13:00 of liner within 1.5'shear screw depth and set 4k,mark pipe then weight fell off.Travel 1'deeper and No-Go out setting down with 25K lb.Repeat 2X and did not see 14klbs shear indication.Pull out of liner and PU to 13,094' 12/22/2015 12/22/2015 2.00 COMPZN .RPCOMP CRIH P Rig up circulating equipment.Pump at 13,094.0 13,094.0 13:00 15:00 3bpm 320psi Slackoff from 13,094' to 13,119'and pump pressure increased to 340psi when entering the liner top,increase to 620 psi when no go out with 5k down. PU off no-go pressure decreased to 340 psi. P/U to 13,094'and pump corrosion inhibited brine spotted from TOL to bottom of SOV.(24 bbl in IA).RU circulating equipment and pump 32 bbls of Corrosion Inhibited brine followed by 108 bbl 9.5 ppg brine and pump at 1-3 bpm,90-320 psi. 12/22/2015 12/22/2015 1.00 COMPZN RPCOMP HOSO P RD circulating equipment and POOH 13,094.0 12,970.0 15:00 16:00 from 13,094'to 12,970'laying down 5 jts of 3 1/2"tubing used for space out. Page 22/24 Report Printed: 1/20/2016 0a Operations Summary (with Timelog epths) CD5-09 ConocoPhiilips Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code lime P-T-X Operation (ftKB) End Depth(ftKB) 12/22/2015 12/22/2015 0.50 COMPZN RPCOMP HOSO P MU(2)x 3-1/2",EUE-M tbg space out 12,970.0 13,113.0 16:00 16:30 pups(10.22'and 8.17').install 3-1/2"x 4-1/2"XO, EUE-M x H563(PxB),MU 2 joints of 4-1/2", 12.6 lb/ft,L-80,H563 tbg(42.36'and 43.47'). 12/22/2015 12/22/2015 0.50 COMPZN RPCOMP RURD P MU ACME wear ring puller to landing 13,113.0 13,113.0 16:30 17:00 joint B.Pull wear ring.LD same 12/22/2015 12/22/2015 2.50 COMPZN RPCOMP THGR P MU tubing hanger and align. 13,113.0 13,113.0 17:00 19:30 Terminate and feed I-wire through hanger and test swedge lock connection to 5,000 psi for 5 min (good). 12/22/2015 12/22/2015 1.00 COMPZN RPCOMP THGR P RU test equip.MU landing joint A to 13,113.0 13,113.0 19:30 20:30 tubing hanger land 3-1/2"tubing on hanger.(No-Go 3.34'from fully located). Test hanger metal-to-metal seals to 250/5,000 psi,hi/low for 5/10 minutes and record.LD landing joint A. 12/22/2015 12/22/2015 1.00 COMPZN RPCOMP RURD P Drop Ball and Rod and let fall. LD I- 13,113.0 13,113.0 20:30 21:30 wire, completion tools.RU head pin, flow tee and hoses.RIH landing jt B. Test surface lines to 4000 psi(good) 12/22/2015 12/22/2015 2.25 COMPZN RPCOMP PRTS P Pressure test tubing to 3,500 psi for 13,113.0 13,113.0 21:30 23:45 30 min-good,(Premier production packer set @ 1,760 psi). Bleed down tbg pressure to 2,100 psi and hold. Pressure test IA to 3,500 psi for 30 min-good. Bleed down IA pressure to zero psi then tubing pressure to zero psi.Open tubing and pressure up IA shearing SOV at 2,500 psi. 12/22/2015 12/23/2015 0.25 COMPZN RPCOMP RURD P Blow down lines and RD circulating 13,113.0 13,113.0 23:45 00:00 equip. 12/23/2015 12/23/2015 0.25 COMPZN RPCOMP RURD P Continue to blow down lines and RD 13,113.0 13,113.0 00:00 00:15 circulating equip. 12/23/2015 12/23/2015 0.50 COMPZN WHDBOP MPSP P Flo-chk-static.LD LJ"B",install TWC 13,113.0 0.0 00:15 00:45 and re-install LJ"B". 12/23/2015 12/23/2015 0.50 COMPZN WHDBOP PRTS P Pump down IA and test TWC and 0.0 0.0 00:45 01:15 Hanger seals in direction of flow to 2,500 psi for 15 min and record- good. Bleed off pressure. 12/23/2015 12/23/2015 0.50 COMPZN WHDBOP OTHR P LD LJ"B",RD circulating equip.,blow 0.0 0.0 01:15 01:45 down lines to cellar. 12/23/2015 12/23/2015 1.25 COMPZN WHDBOP WWWH P MU stack washer and flush stack with 0.0 0.0 01:45 03:00 10 bpm and 50 psi. LD same.Blow down TD and surface lines. 12/23/2015 12/23/2015 2.00 COMPZN WHDBOP MPDA P PJSM. Remove 90'mouse hole,Trip ' 0.0 0.0 03:00 05:00 nipple and Orbit valve.RD MPD RCD, flow lines, 12/23/2015 12/23/2015 1.25 COMPZN WHDBOP NUND P Drain stack,break Ram door bolts. 0.0 0.0 05:00 06:15 ND BOPE,break UPR and Blind ram doors for BWM. SIMOPs-Change out Saver sub from 4"XT-39 to 5"DS50. 12/23/2015 12/23/2015 2.25 COMPZN WHDBOP NUND P Feed thru and terminate I-wire thru 0.0 0.0 06:15 08:30 well head.SIMOPs-Prep tree for NU, continue to c/o Saver-sub, clean and clear rig floor.PU FMC lubricator to rig floor. Page 23/24 Report Printed: 1/20/2016 I - *rations Summary (with Timelog Sths) CD5-09 Conoco'i hilliips hL-s4� Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth(ftKB) 12/23/2015 12/23/2015 1.00 COMPZN WHDBOP NUND P NU tree and adaptor and fill with 0.0 0.0 08:30 09:30 diesel. 12/23/2015 12/23/2015 0.75 COMPZN WHDBOP PRTS P Test void to 5,000 psi for 15 min.- 0.0 0.0 09:30 10:15 good. Test tree to 250/5000 psi for 10 min and record-(good). RD test equip. 12/23/2015 12/23/2015 2.50 COMPZN WHDBOP MPSP P Continue to RD test equipment. Pull 0.0 0.0 10:15 12:45 TWC.SIMOPs-RD mud lines and flare line. 12/23/2015 12/23/2015 0.50 COMPZN WHDBOP FRZP P PJSM.RU squeeze manifold and lines 0.0 12:45 13:15 for freeze protect. 12/23/2015 12/23/2015 2.00 COMPZN WHDBOP FRZP P PJSM.Test lines to 3,000 psi.Pump 0.0 0.0 13:15 15:15 93 bbls diesel freeze protect(w/cmt pump)down IA at 2.2 bpm.Let u-tube across squeeze manifold at 290-300 psi.Final psi after u-tube 250 psi. 12/23/2015 12/23/2015 2.75 COMPZN WHDBOP MPSP P RU lubricator.Install BPV and RD 0.0 0.0 15:15 18:00 lubricator.Test BPV to 2,500 psi for 15 min in direction of flow.Bleed off psi to 400 psi and shut in well on IA. Flush lines with H2O and blow down. RD circ lines and equip.Secure well. 12/23/2015 12/23/2015 2.00 DEMOB MOVE RURD P Blow down water and steam to rig 0.0 0.0 18:00 20:00 sub. Warm up Cold start generator. Take rig off of high-line power at 0600 hrs, 11/20/2015. Release rig from CD5-09 Daywork at 2000 hrs, 12/23/2015. Page 24/24 Report Printed: 1/20/2016 0 i NADConversion Western North Slope CD5 Alpine West Pad CD5-09 Definitive Survey Report 22 December, 2015 0 ConocoPhillips • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) • Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Project Western North Slope,North Slope Alaska,United States Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927(NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-09 Well Position +N/-S 0.00 usft Northing: 5,965,872.31 usft . Latitude: 70°18'49.909 N +El-W 0.00 usft Easting: 349,385.38 usft• Longitude: 151°13'14.529 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.20 usft • Miellbole CD5-09 Magnetics ' Model Name r pIe Date Declination Dip44 -, Field Strength i' A i,n la°a' 1 (nT) ., ', ��.,,;, axe, �r BGGM2015 11/21/2015 17.91 80.83 57,471 Design CD5-09 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 36.69 Vertical Section: Depth From(TVD) +1.11-S +EI-W ' Direction (usft) (usft) (usft) (°) 36.69 0.00 0.00 333.00 Survey Program Date 12/22/2015 From To (usft) (usft) rvey( teilbore) Tool Name Description „ Survey Date 93.00 546.00 CD5-09 Srvy#1-SLB Free Gyro(CD5-0 GYD-GC-SS Gyrodata gyro single shots 11/30/2015 3:28 575.16 2,358.25 CD5-09 Srvy#2-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 11/30/2015 3:32 2,443.92 11,199.69 CD5-09 Srvy#3-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/1/2015 9:59:. 11,293.71 13,220.19 CD5-09 Srvy#4-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/2/2015 1:34: 13,298.78 23,320.20 CD5-09 Srvy#5-MWD+IFR-AK-CAZ-SC MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 12/14/2015 4:2'. � ids +� �E � i� ,��1, °... Vertical Illi f iAZl TVD TVDSS +#tt k < ng DLS Section v z Survey"Tool Name r, (Lek) „ � (usft) `"(tisf€) (eui! w ,, �DO') (ft) 36.69 0.00 0.00 36.69 -34.20 0.00 0.00 5,965,872.31 349,385.38 0.00 0.00 UNDEFINED 93.00 0.30 41.78 93.00 22.11 0.11 0.10 5,965,872.41 349,385.48 0.53 0.05 GYD-GC-SS(1) 115.00 0.28 40.07 115.00 44.11 0.19 0.17 5,965,872.50 349,385.56 0.10 0.10 GYD-GC-SS(1) 20"x 42" 183.00 0.22 32.85 183.00 112.11 0.43 0.35 5,965,872.73 349,385.74 0.10 0.23 GYD-GC-SS(1) 273.00 1.57 343.74 272.99 202.10 1.76 0.10 5,965,874.06 349,385.52 1.60 1.52 GYD-GC-SS(1) 363.00 2.65 345.79 362.92 292.03 4.96 -0.76 5,965,877.28 349,384.72 1.20 4.76 GYD-GC-SS(1) 453.00 3.55 348.56 452.79 381.90 9.71 -1.82 5,965,882.05 349,383.76 1.01 9.48 GYD-GC-SS(1) 546.00 4.37 347.26 545.57 474.68 15.99 -3.17 5,965,888.35 349,382.53 0.89 15.69 GYD-GC-SS(1) 575.16 4.57 347.71 574.64 503.75 18.21 -3.67 5,965,890.58 349,382.08 0.70 17.89 MWD+IFR-AK-CAZ-SC(2) 667.49 5.24 343.10 666.63 595.74 25.83 -5.68 5,965,898.25 349,380.23 0.84 25.59 MWD+IFR-AK-CAZ-SC(2) 12t22/2015 3:13:50PM Page 2 COMPASS 5000.1 Build 74 • ConocoPhillips 0 Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69©70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey ��v Map Map Vertical MD Inc Azi TVD TVDSS +NI-S +E/-W Northing Easting DLS Section (usft) (°) (a) (usft) (usft):, (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 761.82 7.61 341.40 760.36 689.47 35.88 -8.92 5,965,908.35 349,377 19 2.52 36.02 MWD+IFR-AK-CAZ-SC(2) 855.88 9.51 338.57 853.37 782.48 49.01 -13.75 5,965,921.58 349,372.62 2.07 49.91 MWD+IFR-AK-CAZ-SC(2) 950.85 13.01 338.25 946.50 875.61 66.25 -20.58 5,965,938.95 349,366.14 3.69 68.37 MWD+IFR-AK-CAZ-SC(2) 1,044.77 16.40 339.54 1,037.33 966.44 88.50 -29.13 5,965,961.36 349,358.04 3.63 92.08 MWD+IFR-AK-CAZ-SC(2) 1,139.46 18.16 341.33 1,127.74 1,056.85 115.00 -38.53 5,965,988.05 349,349.17 1.94 119.96 MWD+IFR-AK-CAZ-SC(2) 1,233.57 18.96 342.10 1,216.96 1,146.07 143.45 -47.92 5,966,016.67 349,340.35 0.89 149.57 MWD+IFR-AK-CAZ-SC(2) 1,326.79 20.99 342.40 1,304.56 1,233.67 173.78 -57.63 5,966,047.19 349,331.26 2.18 181.00 MVVD+IFR-AK-CAZ-SC(2) 1,421.88 22.77 343.03 1,392.80 1,321.91 207.61 -68.15 5,966,081.23 349,321.42 1.89 215.92 MWD+IFR-AK-CAZ-SC(2) 1,516.10 24.60 342.25 1,479.08 1,408.19 243.73 -79.45 5,966,117.56 349,310.85 1.97 253.24 MWD+IFR-AK-CAZ-SC(2) 1,610.74 27.97 342.23 1,563.92 1,493.03 283.64 -92.23 5,966,157.72 349,298.87 3.56 294.60 MWD+IFR-AK-CAZ-SC(2) 1,705.35 30.81 342.83 1,646.35 1,575.46 327.93 -106.16 5,966,202.27 349,285.83 3.02 340.38 MWD+IFR-AK-CAZ-SC(2) 1,800.52 33.84 346.05 1,726.77 1,655.88 376.94 -119.74 5,966,251.55 349,273.23 3.66 390.22 MWD+IFR-AK-CAZ-SC(2) 1,894.07 37.12 350.02 1,802.95 1,732.06 430.05 -130.92 5,966,304.86 349,263.12 4.28 442.61 MWD+IFR-AK-CAZ-SC(2) 1,988.05 40.33 354.02 1,876.27 1,805.38 488.25 -139.01 5,966,363.21 349,256.21 4.33 498.14 MWD+IFR-AK-CAZ-SC(2) 2,082.38 44.07 357.33 1,946.14 1,875.25 551.40 -143.72 5,966,426.44 349,252.77 4.61 556.55 MWD+IFR-AK-CAZ-SC(2) 2,176.00 47.52 358.08 2,011.41 1,940.52 618.45 -146.39 5,966,493.52 349,251.44 3.73 617.50 MVVD+IFR-AK-CAZ-SC(2) 2,270.75 47.92 359.66 2,075.15 2,004.26 688.54 -147.77 5,966,563.62 349,251.46 1.30 680.58 MWD+IFR-AK-CAZ-SC(2) 2,358.25 46.62 1.35 2,134.53 2,063.64 752.80 -147.21 5,966,627.85 349,253.31 2.05 737.59 MWD+IFR-AK-CAZ-SC(2) 2,409.20 46.45 0.86 2,169.58 2,098.69 789.77 -146.50 5,966,664.80 349,254.76 0.77 770.20 MWD+IFR-AK-CAZ-SC(3) `% 104/4"X13-112" 2,443.92 46.34 0.52 2,193.52 \- 2,122.63 814 91 -14620 5,966,689.93 349,255.57 0.77 792.47 MWD+IFR-AK-CAZ-SC(3) 2,456.69 46.74 1.20 2,202.31 2,131.42 824.18 -146.06 5,966,699.19 349,255.89 4.98 800.66 MWD+IFR-AK-CAZ-SC(3) 2,488.32 47.80 0.81 2,223.77 2,152.88 847.41 -145.65 5,966,722.41 349,256.77 3.47 821.18 MWD+IFR-AK-CAZ-SC(3) 2,551 10 49.99 359.58 2,265.04 2,194.15 894.71 -145.50 5,966,769.69 349,257.87 3.79 863.25 MWD+IFR-AK-CAZ-SC(3) 2,643.46 53.32 358.26 2,322.33 2,251.44 967.12 -146.89 5,966,842.11 349,257.94 3.78 928.40 MWD+IFR-AK-CAZ-SC(3) 2,737.16 57.51 357.61 2,375.51 2,304.62 1,044.20 -149.68 5,966,919.22 349,256.69 4.51 998.34 MVVD+IFR-AK-CAZ-SC(3) 2,831.88 60.66 358.06 2,424.17 2,353.28 1,125.39 -152.74 5,967,000.45 349,255.26 3.35 1,072.07 MWD+IFR-AK-CAZ-SC(3) 2,925.98 60.52 0.91 2,470.38 2,399.49 1,207.35 -153.48 5,967,082.40 349,256.16 2.64 1,145.43 MWD+IFR-AK-CAZ-SC(3) 3,019.61 60.10 359.96 2,516.76 2,445.87 1,288.68 -152.86 5,967,163.70 349,258.41 0.99 1,217.62 MWD+IFR-AK-CAZ-SC(3) 3,114.15 59.59 358.55 2,564.25 2,493.36 1,370.42 -153.92 5,967,245.43 349,258.99 1.40 1,290.93 MWD+IFR-AK-CAZ-SC(3) 3,208.43 59.75 355.89 2,611.87 2,540.98 1,451.69 -157.87 5,967,326.76 349,256.68 2.44 1,365.13 MWD+IFR-AK-CAZ-SC(3) 3,302.43 60.03 355.13 2,659.02 2,588.13 1,532.75 -164.23 5,967,407.93 349,251.94 0.76 1,440.25 MVVD+IFR-AK-CAZ-SC(3) 3,396.61 59.84 354.76 2,706.21 2,635.32 1,613.94 -171.42 5,967,489.24 349,246.39 0.40 1,515.86 MVVD+IFR-AK-CAZ-SC(3) 3,490.92 59.87 353.95 2,753.57 2,682.68 1,695.10 -179.44 5,967,570.54 349,240.00 0.74 1,591.81 MWD+IFR-AK-CAZ-SC(3) 3,585.56 60.19 353.72 2,800.85 2,729.96 1,776.61 -188.24 5,967,652.21 349,232.83 0.40 1,668.44 MWD+IFR-AK-CAZ-SC(3) 3,680.08 59.63 353.73 2,848.23 2,777.34 1,857.91 -197.18 5,967,733.66 349,225.52 0.59 1,744.93 MWD+IFR-AK-CAZ-SC(3) 3,774.51 59.91 355.19 2,895.78 2,824.89 1,939.11 -205.06 5,967,815.00 349,219.28 1.37 1,820.85 MWD+IFR-AK-CAZ-SC(3) 3,868.91 60.15 356.98 2,942.94 2,872.05 2,020.69 -210.64 5,967,896.67 349,215.33 1.66 1,896.08 MWD+IFR-AK-CAZ-SC(3) 3,963.57 59.81 357.93 2,990.30 2,919.41 2,102.57 -214.28 5,967,978.60 349,213.34 0.94 1,970.69 MWD+IFR-AK-CAZ-SC(3) 4,058.19 59.71 358.57 3,037.95 2,967.06 2,184.28 -216.77 5,968,060.33 349,212.48 0.59 2,044.62 MWD+IFR-AK-CAZ-SC(3) 12/22/2015 3:13:50PM Page 3 COMPASS 5000.1 Build 74 • ConocoPhillips • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) S CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Welli',` CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production 3ufvey Map Map Vertical ` MD Inc Azi TVD TVDSS +Ni-S +EI-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,152.26 59.72 0.59 3,085.40 3,014.51 2,265.50 -217.37 5,968,141 54 349,213.51 1.85 2,117.26 MWD+IFR-AK-CAZ-SC(3) 4,246.17 59.59 0.35 3,132.84 3,061.95 2,346.54 -216.71 5,968,222.55 349,215.81 0.26 2,189.17 MWD+IFR-AK-CAZ-SC(3) 4,340.80 59.03 0.28 3,181.14 3,110.25 2,427.92 -216.26 5,968,303.89 349,217.88 0.60 2,261.47 MWD+IFR-AK-CAZ-SC(3) 4,435.44 59.28 358.84 3,229.66 3,158.77 2,509.16 -216.88 5,968,385.13 349,218.89 1.33 2,334.15 MWD+IFR-AK-CAZ-SC(3) 4,529.43 59.59 358.11 3,277.46 3,206.57 2,590.07 -219.04 5,968,466.05 349,218.36 0.75 2,407.21 MWD+IFR-AK CAZ-SC(3) 4,622.06 59.42 355.29 3,324.47 3,253.58 2,669.74 -223.63 5,968,545.79 349,215.37 2.63 2,480.28 MWD+IFR-AK-CAZ-SC(3) 4,716.11 59.28 356.29 3,372.42 3,301.53 2,750.43 -229.57 5,968,626.58 349,211.04 0.93 2,554.87 MWD+IFR-AK-CAZ-SC(3) 4,810.46 59.32 355.29 3,420.59 3,349.70 2,831.34 -235.53 5,968,707.59 349,206.71 0.91 2,629.66 MWD+IFR-AK-CAZ-SC(3) 4,905.03 59.36 354.93 3,468.81 3,397.92 2,912.39 -242.46 5,968,788.76 349,201.41 0.33 2,705.03 MWD+IFR-AK-CAZ-SC(3) 4,999.29 59.34 355.08 3,516.87 3,445.98 2,993.17 -249.52 5,968,869.66 349,195.97 0.14 2,780.22 MWD+IFR-AK-CAZ-SC(3) 5,093.96 59.62 354.90 3,564.94 3,494.05 3,074.41 -256.64 5,968,951.02 349,190.48 0.34 2,855.84 MWD+IFR-AK-CAZ-SC(3) 5,188.13 59.52 355.59 3,612.64 3,541.75 3,155.33 -263.37 5,969,032.05 349,185.37 0.64 2,930.99 MWD+IFR-AK-CAZ-SC(3) 5,282.42 59.31 357.02 3,660.62 3,589.73 3,236.33 -268.61 5,969,113.13 349,181.77 1.32 3,005.54 MWD+IFR-AK-CAZ-SC(3) 5,377.10 59.46 359.28 3,708.84 3,637.95 3,317.76 -271.24 5,969,194.60 349,180.77 2.06 3,079.29 MWD+IFR-AK-CAZ-SC(3) 5,470.97 59.24 0.38 3,756.70 3,685.81 3,398.52 -271.48 5,969,275.33 349,182.15 1.04 3,151.35 MWD+IFR-AK-CAZ-SC(3) 5,565.44 59.54 0.40 3,804.80 3,733.91 3,479.82 -270.92 5,969,356.60 349,184.33 0.32 3,223.54 MWD+IFR-AK-CAZ-SC(3) 5,659.72 59.66 359.08 3,852.51 3,781.62 3,561.14 -271.29 5,969,437.90 349,185.60 1.21 3,296.16 MWD+IFR-AK-CAZ-SC(3) 5,754.75 59.59 358.71 3,900.56 3,829.67 3,643.11 -272.87 5,969,519.88 349,185.66 0.34 3,369.91 MWD+IFR-AK-CAZ-SC(3) 5,848.76 59.38 358.40 3,948.30 3,877.41 3,724.07 -274.91 5,969,600.86 349,185.24 0.36 3,442.98 MWD+IFR-AK-CAZ-SC(3) 5,942.57 59.38 358.06 3,996.08 3,925.19 3,804.76 -277.41 5,969,681.58 349,184.37 0.31 3,516.01 MWD+IFR-AK-CAZ-SC(3) 6,036.94 59.42 357.86 4,044.12 3,973.23 3,885.94 -280.30 5,969,762.80 349,183.10 0.19 3,589.65 MWD+IFR-AK-CAZ-SC(3) 6,130.78 59.48 358.43 4,091.82 4,020.93 3,966.71 -282.92 5,969,843.60 349,182.11 0.53 3,662.80 MWD+IFR-AK-CAZ-SC(3) 6,222.88 59.55 358.52 4,138.54 4,067.65 4,046.05 -285.03 5,969,922.96 349,181.59 0.11 3,734.46 MWD+IFR-AK-CAZ-SC(3) 6,316.99 59.51 359.12 4,186.26 4,115.37 4,127.14 -286.70 5,970,004.06 349,181.55 0.55 3,807.47 MWD+IFR-AK-CAZ-SC(3) 6,412.03 59.76 359.47 4,234.31 4,163.42 4,209.14 -287.71 5,970,086.06 349,182.18 0.41 3,880.99 MWD+IFR-AK-CAZ-SC(3) 6,504.42 59.28 359.64 4,281.17 4,210.28 4,288.76 -288.33 5,970,165.67 349,183.16 0.54 3,952.21 MWD+IFR-AK-CAZ-SC(3) 6,600.13 59.28 359.10 4,330.06 4,259.17 4,371.03 -289.23 5,970,247.94 349,183.91 0.49 4,025.93 MWD+IFR-AK-CAZ-SC(3) 6,693.94 59.25 358.96 4,378.00 4,307.11 4,451.66 -290.60 5,970,328.56 349,184.16 0.13 4,098.38 MWD+IFR-AK-CAZ-SC(3) 6,787.89 59.47 358.15 4,425.89 4,355.00 4,532.46 -292.63 5,970,409.39 349,183.74 0.78 4,171.31 MWD+IFR-AK-CAZ-SC(3) 6,881.78 59.30 357.58 4,473.70 4,402.81 4,613.21 -295.64 5,970,490.17 349,182.35 0.55 4,244.62 MWD+IFR-AK-CAZ-SC(3) 6,977.05 59.49 357.20 4,522.21 4,451.32 4,695.12 -299.38 5,970,572.14 349,180.26 0.40 4,319.30 MWD+IFR-AK-CAZ-SC(3) 7,071.32 59.42 357.15 4,570.11 4,499.22 4,776.21 -303.38 5,970,653.29 349,177.89 0.09 4,393.37 MWD+IFR-AK-CAZ-SC(3) 7,165.10 59.37 356.86 4,617.86 4,546.97 4,856.82 -307.60 5,970,733.95 349,175.29 0.27 4,467.10 MVVD+IFR-AK-CAZ-SC(3) 7,258.90 59.25 357.21 4,665.73 4,594.84 4,937.37 -311.77 5,970,814.57 349,172.73 0.35 4,540.77 MWD+IFR-AK-CAZ-SC(3) 7,353.35 59.31 357.45 4,713.98 4,643.09 5,018.48 -315.55 5,970,895.73 349,170.58 0.23 4,614.75 MWD+IFR-AK-CAZ-SC(3) 7,445.60 59.31 358.27 4,761.07 4,690.18 5,097.75 -318.51 5,970,975.04 349,169.21 0.76 4,686.73 MWD+IFR-AK-CAZ-SC(3) 7,541.44 59.69 358.29 4,809.71 4,738.82 5,180.29 -320.99 5,971,057.61 349,168.39 0.40 4,761.40 MWD+IFR-AK-CAZ-SC(3) 7,635.23 59.76 0.03 4,857.00 4,786.11 5,261.28 -322.18 5,971,138.60 349,168.82 1.60 4,834.10 MWD+IFR-AK-CAZ-SC(3) 7,728.10 59.50 1.38 4,903.95 4,833.06 5,341.40 -321.20 5,971,218.67 349,171.41 1.29 4,905.04 MWD+IFR-AK-CAZ-SC(3) 7,822.87 59.66 1.36 4,951.94 4,881.05 5,423.10 -319.24 5,971,300.31 349,175.01 0.17 4,976.95 MWD+IFR-AK-CAZ-SC(3) 12/22/2015 3:13:50PM Page 4 COMPASS 5000.1 Build 74 • ConocoPhillips • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi ' TVD ` TVDSS +N/-S +El-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) 01001 (ft) Survey Tool Name 7,917.89 59.59 1.42 4,999.99 4,929.10 5,505.05 -317.25 5,971,382 20 349,178.64 0.09 5,049.06 MWD+IFR-AK-CAZ-SC(3) 8,012.40 59.68 0.71 5,047.76 4,976.87 5,586.58 -315.74 5,971,463.68 349,181.79 0.66 5,121.02 MWD+IFR-AK-CAZ-SC(3) 8,106.78 59.76 359.26 5,095.35 5,024.46 5,668.08 -315.76 5,971,545.16 349,183.40 1.33 5,193.65 MWD+IFR-AK-CAZ-SC(3) 8,201.35 59.65 357.95 5,143.06 5,072.17 5,749.71 -317.75 5,971,626.80 349,183.05 1.20 5,267.28 MWD+IFR-AK-CAZ-SC(3) 8,295.22 59.20 356.36 5,190.81 5,119.92 5,830.42 -321.75 5,971,707.58 349,180.66 1.54 5,341.02 MWD+IFR-AK-CAZ-SC(3) 8,389.19 59.04 355.22 5,239.04 5,168.15 5,910.85 -327.67 5,971,788.10 349,176.36 1.06 5,415.37 MWD+IFR-AK-CAZ-SC(3) 8,483.13 59.33 356.09 5,287.16 5,216.27 5,991.30 -333.79 5,971,868.65 349,171.86 0.85 5,489.82 MWD+IFR-AK-CAZ-SC(3) 8,574.31 59.32 356.78 5,333.68 5,262.79 6,069.57 -338.66 5,971,946.99 349,168.56 0.65 5,561.77 MWD+IFR-AK-CAZ-SC(3) 8,670.31 59.12 356.56 5,382.81 5,311.92 6,151.91 -343.45 5,972,029.41 349,165.42 0.29 5,637.31 MWD+IFR-AK-CAZ-SC(3) 8,764.04 59.12 356.74 5,430.92 5,360.03 6,232.21 -348.15 5,972,109.78 349,162.33 0.16 5,711.00 MWD+IFR-AK-CAZ-SC(3) 8,856.91 59.54 357.07 5,478.29 5,407.40 6,311.97 -352.47 5,972,189.61 349,159.62 0.55 5,784.03 MWD+IFR-AK-CAZ-SC(3) 8,950.90 59.28 358.70 5,526.12 5,455.23 6,392.82 -355.45 5,972,270.50 349,158.25 1.52 5,857.42 MWD+IFR-AK-CAZ-SC(3) 9,043.29 59.25 357.92 5,573.34 5,502.45 6,472.20 -357.80 5,972,349.90 349,157.51 0.73 5,929.21 MWD+IFR-AK-CAZ-SC(3) 9,136.93 59.47 357.31 5,621.06 5,550.17 6,552.70 -361.15 5,972,430.44 349,155.77 0.61 6,002.45 MWD+IFR-AK-CAZ-SC(3) 9,231.04 59.32 357.11 5,668.97 5,598.08 6,633.60 -365.09 5,972,511.40 349,153.45 0.24 6,076.33 MWD+IFR-AK-CAZ-SC(3) 9,325.98 59.25 357.17 5,717.47 5,646.58 6,715.12 -369.16 5,972,592.98 349,151.01 0.09 6,150.81 MWD+IFR-AK-CAZ-SC(3) 9,418.71 59.53 358.00 5,764.68 5,693.79 6,794.86 -372.53 5,972,672.76 349,149.25 0.83 6,223.39 MWD+IFR-AK-CAZ-SC(3) 9,512.39 59.48 359.56 5,812.23 5,741.34 6,875.56 -374.24 5,972,753.48 349,149.15 1.44 6,296.07 MWD+IFR-AK-CAZ-SC(3) 9,607.42 59.53 359.06 5,860.45 5,789.56 6,957.44 -375.23 5,972,835.35 349,149.81 0.46 6,369.47 MWD+IFR-AK-CAZ-SC(3) 9,701.39 59.56 358.72 5,908.08 5,837.19 7,038.42 -376.80 5,972,916.35 349,149.86 0.31 6,442.35 MWD+IFR-AK-CAZ-SC(3) 9,794.77 59.38 358.89 5,955.52 5,884.63 7,118.84 -378.48 5,972,996.78 349,149.80 0.25 6,514.76 MWD+IFR-AK-CAZ-SC(3) 9,889.44 59.56 358.63 6,003.61 5,932.72 7,200.37 -380.24 5,973,078.32 349,149.67 0.30 6,588.20 MWD+IFR-AK-CAZ-SC(3) 9,983.12 59.42 358.59 6,051.17 5,980.28 7,281.05 -382.20 5,973,159.02 349,149.33 0.15 6,660.98 MWD+IFR-AK-CAZ-SC(3) 10,076.68 59.46 358.60 6,098.74 6,027.85 7,361.59 -384.18 5,973,239.58 349,148.97 0.04 6,733.64 MWD+IFR-AK-CAZ-SC(3) 10,170.22 59.53 357.96 6,146.22 6,075.33 7,442.15 -386.59 5,973,320.16 349,148.17 0.59 6,806.51 MWD+IFR-AK-CAZ-SC(3) 10,264.10 59.38 358.31 6,193.93 6,123.04 7,522.96 -389.23 5,973,401.00 349,147.16 0.36 6,879.71 MWD+IFR-AK-CAZ-SC(3) 10,357.91 59.46 357.60 6,241.66 6,170.77 7,603.67 -392.11 5,973,481.74 349,145.90 0.66 6,952.93 MWD+IFR-AK-CAZ-SC(3) 10,451.19 59.49 357.37 6,289.04 6,218.15 7,683.94 -395.63 5,973,562.07 349,143.98 0.21 7,026.06 MWD+IFR-AK-CAZ-SC(3) 10,545.42 59.39 356.87 6,336.95 6,266.06 7,764.98 -399.71 5,973,643.17 349,141.53 0.47 7,100.11 MWD+IFR-AK-CAZ-SC(3) 10,638.42 59.45 355.38 6,384.26 6,313.37 7,844.86 -405.12 5,973,723.13 349,137.72 1.38 7,173.74 MWD+IFR-AK-CAZ-SC(3) 10,732.21 59.45 355.16 6,431.93 6,361.04 7,925.36 -411.78 5,973,803.74 349,132.68 0.20 7,248.49 MWD+IFR-AK-CAZ-SC(3) 10,824.67 59.53 355.79 6,478.87 6,407.98 8,004.76 -418.07 5,973,883.25 349,127.99 0.59 7,322.10 MWD+IFR-AK-CAZ-SC(3) 10,918.44 59.34 356.53 6,526.56 6,455.67 8,085.32 -423.47 5,973,963.90 349,124.20 0.71 7,396.33 MWD+IFR-AK-CAZ-SC(3) 11,012.71 59.60 356.47 6,574.45 6,503.56 8,166.37 -428.43 5,974,045.02 349,120.87 0.28 7,470.80 MWD+IFR-AK-CAZ-SC(3) 11,105.90 59.50 357.79 6,621.68 6,550.79 8,246.61 -432.45 5,974,125.31 349,118.46 1.23 7,544.11 MWD+IFR-AK-CAZ-SC(3) 11,199.69 59.33 358.09 6,669.40 6,598.51 8,327.29 -435.36 5,974,206.04 349,117.17 0.33 7,617.32 MWD+IFR-AK-CAZ-SC(3) 11,293.71 59.18 358.96 6,717.46 6,646.57 8,408.07 -437.44 5,974,286.84 349,116.72 0.81 7,690.24 MWD+IFR-AK-CAZ-SC(4) 11,385.70 59.40 359.15 6,764.44 6,693.55 8,487.15 -438.74 5,974,365.92 349,117.00 0.30 7,761.29 MWD+IFR-AK-CAZ-SC(4) 11,479.40 59.44 358.56 6,812.11 6,741.22 8,567.80 -440.35 5,974,446.58 349,117.00 0.54 7,833.88 MWD+IFR-AK-CAZ-SC(4) 11,573.11 59.33 358.03 6,859.83 6,788.94 8,648.41 -442.75 5,974,527.22 349,116.22 0.50 7,906.80 MWD+IFR-AK-CAZ-SC(4) 12/22/2015 3:13:50PM Page 5 COMPASS 5000.1 Build 74 • ConocoPhillips • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS` +N/-S +E/-W Northing Easting DLS Section (usft) (0) (°) (usft) (usft) (usft) (usft) (ft) (ft) ('J100') (ft) Survey Tool Name 11,666.63 59.48 358.17 6,907.43 6,836.54 8,728.87 -445.42 5,974,607.71 349,115.17 0.21 7,979.70 MWD+IFR-AK-CAZ-SC(4) 11,760.65 59.40 357.62 6,955.24 6,884.35 8,809.78 -448.40 5,974,688.65 349,113.82 0.51 8,053.14 MWD+IFR-AK-CAZ-SC(4) 11,853.82 59.40 356.06 7,002.67 6,931.78 8,889.85 -452.82 5,974,768.79 349,111.00 1.44 8,126.48 MWD+IFR-AK-CAZ-SC(4) 11,948.30 59.40 355.80 7,050.76 6,979.87 8,970.96 -458.59 5,974,850.00 349,106.86 0.24 8,201.38 MWD+IFR-AK-CAZ-SC(4) 12,041.39 59.44 354.66 7,098.12 7,027.23 9,050.83 -465.25 5,974,929.97 349,101.80 1.06 8,275.57 MWD+IFR-AK-CAZ-SC(4) 12,135.10 61.27 352.50 7,144.47 7,073.58 9,131.75 -474.37 5,975,011.05 349,094.31 2.80 8,351.81 MWD+IFR-AK-CAZ-SC(4) 12,227.99 63.06 349.58 7,187.85 7,116.96 9,212.87 -487.18 5,975,092.41 349,083.13 3.38 8,429.90 MWD+IFR-AK-CAZ-SC(4) 12,322.50 66.73 347.53 7,227.95 7,157.06 9,296.72 -504.18 5,975,176.58 349,067.82 4.35 8,512.33 MWD+IFR-AK-CAZ-SC(4) 12,415.42 69.47 345.52 7,262.61 7,191.72 9,380.55 -524.28 5,975,260.79 349,049.40 3.57 8,596.15 MWD+IFR-AK-CAZ-SC(4) 12,509.35 72.28 345.26 7,293.38 7,222.49 9,466.42 -546.66 5,975,347.08 349,028.75 3.00 8,682.82 MWD+IFR-AK-CAZ-SC(4) 12,603.05 73.78 344.48 7,320.72 7,249.83 9,552.93 -570.06 5,975,434.03 349,007.09 1.79 8,770.52 MWD+IFR-AK-CAZ-SC(4) 12,696.90 76.53 342.64 7,344.77 7,273.88 9,639.92 -595.74 5,975,521.52 348,983.17 3.49 8,859.69 MWD+IFR-AK-CAZ-SC(4) 12,790.82 78.06 341.04 7,365.43 7,294.54 9,726.97 -624.29 5,975,609.12 348,956.36 2.33 8,950.22 MWD+IFR-AK-CAZ-SC(4) 12,884.76 80.25 339.37 7,383.10 7,312.21 9,813.77 -655.54 5,975,696.52 348,926.87 2.91 9,041.74 MWD+IFR-AK-CAZ-SC(4) 12,978.58 83.93 338.06 7,396.01 7,325.12 9,900.34 -689.27 5,975,783.74 348,894.88 4.16 9,134.19 MVVD+IFR-AK-CAZ-SC(4) 13,072.13 85.92 336.14 7,404.29 7,333.40 9,986.17 -725.53 5,975,870.28 348,860.35 2.95 9,227.13 MWD+IFR-AK-CAZ-SC(4) 13,092.98 85.90 335.20 7,405.77 7,334.88 10,005.12 -734.10 5,975,889.39 348,852.17 4.49 9,247.90 MWD+IFR-AK-CAZ-SC(4) CD5-09 01.Heel 071615 JB 13,165.31 85.82 331.95 7,411.00 7,340.11 10,069.71 -766.20 5,975,954.61 348,821.37 4.49 9,320.03 MWD+IFR-AK-CAZ-SC(4) 13,220.19 85.57 330.70 7,415.12 7,344.23 10,117.73 -792.46 5,976,003.14 348,796.09 2.32 9,374.73 MWD+IFR-AK-CAZ-SC(4) 13,271.70 87.07 331.40 7,418.43 7,347.54 10,162.70 -817.34 5,976,048.61 348,772.11 3.21 9,426.10 MWD+IFR-AK-CAZ-SC(5) 7.5!8'"x 13,298.78 87.86 331.76 7,419.62 7,348.73 10,186.50 -830.21 5,976,072.65 348,759.72 3.21 9,453.14 MWD+IFR-AK-CAZ-SC(5) 13,393.40 90.35 332.27 7,421.10 7,350.21 10,270.04 -874.61 5,976,157.06 348,717.01 2.69 9,547.73 MWD+IFR-AK-CAZ-SC(5) 13,488.75 89.81 330.97 7,420.97 7,350.08 10,353.92 -919.93 5,976,241.83 348,673.39 1.48 9,643.05 MWD+IFR-AK-CAZ-SC(5) 13,584.28 91.18 331.92 7,420.14 7,349.25 10,437.83 -965.59 5,976,326.63 348,629.42 1.75 9,738.54 MWD+IFR-AK-CAZ-SC(5) 13,679.30 90.43 329.89 7,418.81 7,347.92 10,520.84 -1,011.78 5,976,410.55 348,584.91 2.28 9,833.48 MWD+IFR-AK-CAZ-SC(5) 13,777.18 90.85 329.21 7,417.71 7,346.82 10,605.22 -1,061.38 5,976,495.89 348,537.01 0.82 9,931.18 MWD+IFR-AK-CAZ-SC(5) 13,869.81 91.79 329.18 7,415.58 7,344.69 10,684.76 -1,108.81 5,976,576.36 348,491.19 1.02 10,023.58 MWD+IFR-AK-CAZ-SC(5) 13,965.43 91.29 328.72 7,413.01 7,342.12 10,766.65 -1,158.11 5,976,659.22 348,443.55 0.71 10,118.92 MWD+IFR-AK-CAZ-SC(5) 14,057.34 90.71 329.01 7,411.41 7,340.52 10,845.30 -1,205.62 5,976,738.81 348,397.63 0.71 10,210.58 MWD+IFR-AK-CAZ-SC(5) 14,149.46 90.16 330.80 7,410.71 7,339.82 10,925.00 -1,251.81 5,976,819.41 348,353.05 2.03 10,302.56 MWD+IFR-AK-CAZ-SC(5) 14,241.29 89.92 331.02 7,410.64 7,339.75 11,005.25 -1,296.46 5,976,900.53 348,310.02 0.35 10,394.33 M1MD+IFR-AK-CAZ-SC(5) 14,333.64 90.30 333.76 7,410.47 7,339.58 11,087.07 -1,339.25 5,976,983.19 348,268.88 3.00 10,486.66 MWD+IFR-AK-CAZ-SC(5) 14,424.32 90.43 333.85 7,409.89 7,339.00 11,168.44 -1,379.28 5,977,065.33 348,230.50 0.17 10,577.33 MWD+IFR-AK-CAZ-SC(5) 14,515.06 90.85 334.74 7,408.87 7,337.98 11,250.19 -1,418.64 5,977,147.85 348,192.79 1.08 10,668.04 MWD+IFR-AK-CAZ-SC(5) 14,605.92 90.78 334.03 7,407.58 7,336.69 11,332.11 -1,457.91 5,977,230.54 348,155.17 0.79 10,758.87 MWD+IFR-AK-CAZ-SC(5) 14,701.10 91.51 335.49 7,405.68 7,334.79 11,418.19 -1,498.49 5,977,317.40 348,116.33 1.71 10,853.98 MW3+IFR-AK-CAZ-SC(5) 14,789.32 91.19 335.48 7,403.60 7,332.71 11,498.43 -1,535.09 5,977,398.36 348,081.36 0.36 10,942.09 MWD+IFR-AK-CAZ-SC(5) 14,880.97 91.22 335.35 7,401.67 7,330.78 11,581.75 -1,573.21 5,977,482.42 348,044.92 0.15 11,033.64 MWD+IFR-AK-CAZ-SC(5) 12/2212015 3:13:50PM Page 6 COMPASS 5000.1 Build 74 • ConocoPhillips 0 Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Well: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey �3y Map Map Vertical MD Inc Azi TVD TVDSS +N/-S , +E/-W Northing Easting DLS Section (usft) , (°) (°) (usft) (usft) (usft) (usft) (ft): (ft) (°/100') (ft) Survey Tool Name 14,97222 91.33 335.42 7,399.64 7,328.75 11,664.69 -1,611.20 5,977,566.10 348,008.59 0.14 11,124.79 MWD+IFR-AK-CAZ-SC(5) 15,064.37 91.36 335.52 7,397.48 7,326.59 11,748.50 -1,649.45 5,977,650.66 347,972.04 0.11 11,216.83 MW13+IFR-AK-CAZ-SC(5) 15,156.79 91.29 334.56 7,395.34 7,324.45 11,832.27 -1,688.44 5,977,735.18 347,934.74 1.04 11,309.16 MWD+IFR-AK-CAZ-SC(5) 15,248.43 91.09 333.48 7,393.44 7,322.55 11,914.63 -1,728.58 5,977,818.32 347,896.27 1.20 11,400.77 MWD+IFR-AK-CAZ-SC(5) 15,339.45 90.09 333.27 7,392.50 7,321.61 11,995.99 -1,769.36 5,977,900.48 347,857.12 1.12 11,491.78 MWD+IFR-AK-CAZ-SC(5) 15,431.64 90.38 332.92 7,392.13 7,321.24 12,078.20 -1,811.08 5,977,983.50 347,817.07 0.49 11,583.97 MWD+IFR-AK-CAZ-SC(5) 15,524.08 89.34 332.63 7,392.35 7,321.46 12,160.40 -1,853.37 5,978,066.53 347,776.44 1.17 11,676.40 MWD+IFR-AK-CAZ-SC(5) 15,615.02 89.41 332.43 7,393.34 7,322.45 12,241.08 -1,895.32 5,978,148.03 347,736.12 0.23 11,767.34 MWD+IFR-AK-CAZ-SC(5) 15,706.48 88.72 332.25 7,394.84 7,323.95 12,322.07 -1,937.77 5,978,229.85 347,695.30 0.78 11,858.78 MWD+IFR-AK-CAZ-SC(5) 15,798.23 88.86 332.68 7,396.77 7,325.88 12,403.41 -1,980.17 5,978,312.02 347,654.54 0.49 11,950.50 MWD+IFR-AK-CAZ-SC(5) 15,889.68 88.86 332.60 7,398.59 7,327.70 12,484.62 -2,022.19 5,978,394.05 347,614.16 0.09 12,041.93 MWD+IFR-AK-CAZ-SC(5) 15,982.04 88.14 330.98 7,401.01 7,330.12 12,565.98 -2,065.84 5,978,476.26 347,572.16 1.92 12,134.24 MWD+IFR-AK-CAZ-SC(5) 16,074.47 88.24 330.61 7,403.93 7,333.04 12,646.62 -2,110.91 5,978,557.78 347,528.72 0.41 12,226.55 MWD+IFR-AK-CAZ-SC(5) 16,169.87 88.14 331.37 7,406.94 7,336.05 12,730.00 -2,157.16 5,978,642.07 347,484.16 0.80 12,321.85 MWD+IFR-AK-CAZ-SC(5) 16,265.04 87.83 331.29 7,410.29 7,339.40 12,813.45 -2,202.79 5,978,726.41 347,440.22 0.34 12,416.92 MWD+IFR-AK-CAZ-SC(5) 16,361.06 88.72 331.21 7,413.18 7,342.29 12,897.60 -2,248.95 5,978,811.46 347,395.75 0.93 12,512.85 MWD+IFR-AK-CAZ-SC(5) 16,455.21 89.93 332.11 7,414.29 7,343.40 12,980.46 -2,293.64 5,978,895.19 347,352.74 1.60 12,606.96 MWD+IFR-AK-CAZ-SC(5) 16,550.50 90.20 332.21 7,414.18 7,343.29 13,064.72 -2,338.14 5,978,980.32 347,309.94 0.30 12,702.24 MWD+IFR-AK-CAZ-SC(5) 16,645.74 90.64 332.31 7,413.48 7,342.59 13,149.01 -2,382.47 5,979,065.48 347,267.31 0.47 12,797.47 MWD+IFR-AK-CAZ-SC(5) 16,741.50 92.38 333.71 7,410.96 7,340.07 13,234.30 -2,425.91 5,979,151.62 347,225.59 2.33 12,893.19 MWD+IFR-AK-CAZ-SC(5) 16,836.02 92.29 332.19 7,407.11 7,336.22 13,318.41 -2,468.86 5,979,236.57 347,184.35 1.61 12,987.63 MWD+IFR-AK-CAZ-SC(5) 16,932.04 93.90 331.99 7,401.92 7,331.03 13,403.14 -2,513.74 5,979,322.17 347,141.18 1.69 13,083.49 MWD+IFR-AK-CAZ-SC(5) 17,027.38 95.12 332.97 7,394.43 7,323.54 13,487.42 -2,557.65 5,979,407.32 347,098.97 1.64 13,178.53 MWD+IFR-AK-CAZ-SC(5) 17,122.26 95.16 332.89 7,385.93 7,315.04 13,571.57 -2,600.66 5,979,492.30 347,057.66 0.09 13,273.03 MWD+IFR-AK-CAZ-SC(5) 17,217.31 92.94 333.09 7,379.21 7,308.32 13,656.04 -2,643.71 5,979,577.61 347,016.31 2.35 13,367.84 MWD+IFR-AK-CAZ-SC(5) 17,312.84 89.76 329.64 7,376.96 7,306.07 13,739.83 -2,689.47 5,979,662.30 346,972.25 4.91 13,463.28 MWD+IFR-AK-CAZ-SC(5) 17,408.01 89.75 329.23 7,377.37 7,306.48 13,821.78 -2,737.86 5,979,745.19 346,925.51 0.43 13,558.26 MWD+IFR-AK-CAZ-SC(5) 17,504.06 89.23 328.70 7,378.22 7,307.33 13,904.08 -2,787.38 5,979,828.46 346,877.66 0.77 13,654.07 MWD+IFR-AK-CAZ-SC(5) 17,598.25 88.37 329.38 7,380.20 7,309.31 13,984.83 -2,835.82 5,979,910.16 346,830.85 1.16 13,748.01 MWD+IFR-AK-CAZ-SC(5) 17,693.83 89.28 330.05 7,382.16 7,311.27 14,067.35 -2,884.01 5,979,993.62 346,784.33 1.18 13,843.41 MWD+IFR-AK-CAZ-SC(5) 17,789.50 89.13 330.46 7,383.48 7,312.59 14,150.40 -2,931.48 5,980,077.61 346,738.54 0.46 13,938.96 MWD+IFR-AK-CAZ-SC(5) 17,884.87 90.53 332.56 7,383.77 7,312.88 14,234.22 -2,976.96 5,980,162.31 346,694.75 2.65 14,034.29 MWD+IFR-AK-CAZ-SC(5) 17,979.94 89.66 332.25 7,383.61 7,312.72 14,318.47 -3,021.00 5,980,247.43 346,652.41 0.97 14,129.36 MWD+IFR-AK-CAZ-SC(5) 18,075.99 87.65 333.01 7,385.86 7,314.97 14,403.74 -3,065.14 5,980,333.56 346,609.99 2.24 14,225.37 MW13+IFR-AK-CAZ-SC(5) 18,170.94 87.49 334.72 7,389.89 7,319.00 14,488.90 -3,106.93 5,980,419.54 346,569.93 1.81 14,320.22 MWD+IFR-AK-CAZ-SC(5) 18,266.27 88.17 337.41 7,393.50 7,322.61 14,575.96 -3,145.57 5,980,507.35 346,533.04 2.91 14,415.34 MWD+IFR-AK-CAZ-SC(5) 18,360.74 88.65 338.94 7,396.12 7,325.23 14,663.63 -3,180.68 5,980,595.69 346,499.70 1.70 14,509.38 MWD+IFR-AK-CAZ-SC(5) 18,456.23 89.20 338.12 7,397.91 7,327.02 14,752.47 -3,215.62 5,980,685.21 346,466.55 1.03 14,604.41 MVVD+IFR-AK-CAZ-SC(5) 18,552.27 90.42 336.82 7,398.23 7,327.34 14,841.18 -3,252.42 5,980,774.63 346,431.54 1.86 14,700.15 MWD+IFR-AK-CAZ-SC(5) 18,646.08 93.90 335.53 7,394.70 7,323.81 14,926.92 -3,290.28 5,980,861.11 346,395.41 3.96 14,793.74 MWD+IFR-AK-CAZ-SC(5) 12/22/2015 3:13:50PM Page 7 COMPASS 5000.1 Build 74 • ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Welt:, . CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation MethodMinimum Curvature f Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +NIS +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 18,740.95 93.60 334.92 7,388.49 7,317.60 15,012.87 -3,329.95 5,980,947.83 346,357.48 0.72 14,888.33 MWD+IFR-AK-CAZ-SC(5) 18,837.09 92.29 332.55 7,383.55 7,312.66 15,098.96 -3,372.44 5,981,034.75 346,316.73 2.81 14,984.33 MWD+IFR-AK-CAZ-SC(5) 18,933.03 91.36 330.15 7,380.50 7,309.61 15,183.11 -3,418.41 5,981,119.80 346,272.46 2.68 15,080.17 MWD+IFR-AK-CAZ-SC(5) 19,028.35 91.94 329.26 7,377.75 7,306.86 15,265.37 -3,466.47 5,981,203.01 346,226.06 1.11 15,175.29 MWD+IFR-AK-CAZ-SC(5) 19,122.76 92.53 329.67 7,374.07 7,303.18 15,346.63 -3,514.40 5,981,285.20 346,179.77 0.76 15,269.45 MWD+IFR-AK-CAZ-SC(5) 19,217.93 92.94 328.77 7,369.53 7,298.64 15,428.30 -3,563.05 5,981,367.82 346,132.78 1.04 15,364.31 MWD+IFR-AK-CAZ-SC(5) 19,313.93 93.14 328.50 7,364.44 7,293.55 15,510.16 -3,612.94 5,981,450.66 346,084.54 0.35 15,459.89 MVVD+IFR-AK-CAZ-SC(5) 19,408.98 93.42 328.40 7,359.00 7,288.11 15,591.02 -3,662.60 5,981,532.50 346,036.52 0.31 15,554.49 MWD+IFR-AK-CAZ-SC(5) 19,504.33 93.43 329.24 7,353.30 7,282.41 15,672.45 -3,711.87 5,981,614.89 345,988.89 0.88 15,649.41 MWD+IFR-AK-CAZ-SC(5) 19,600.30 92.36 328.92 7,348.46 7,277.57 15,754.68 -3,761.12 5,981,698.08 345,941.30 1.16 15,745.04 MWD+IFR-AK-CAZ-SC(5) 19,694.83 91.12 330.22 7,345.59 7,274.70 15,836.15 -3,808.98 5,981,780.49 345,895.09 1.90 15,839.35 MWD+IFR-AK-CAZ-SC(5) 19,790.10 90.79 331.85 7,344.00 7,273.11 15,919.48 -3,855.11 5,981,864.73 345,850.65 1.75 15,934.55 MVVD+IFR-AK-CAZ-SC(5) 19,885.46 89.37 332.50 7,343.86 7,272.97 16,003.82 -3,899.62 5,981,949.93 345,807.84 1.64 16,029.89 MWD+IFR-AK-CAZ-SC(5) 19,981.63 88.79 332.87 7,345.41 7,274.52 16,089.25 -3,943.74 5,982,036.23 345,765.45 0.72 16,126.05 MVVD+IFR-AK-CAZ-SC(5) 20,076.59 88.27 333.24 7,347.84 7,276.95 16,173.87 -3,986.76 5,982,121.69 345,724.14 0.67 16,220.98 MVVD+IFR-AK-CAZ-SC(5) 20,172.24 89.10 333.02 7,350.04 7,279.15 16,259.17 -4,029.98 5,982,207.83 345,682.64 0.90 16,316.60 MWD+IFR-AK-CAZ-SC(5) 20,266.72 89.58 333.67 7,351.13 7,280.24 16,343.61 -4,072.36 5,982,293.09 345,641.97 0.86 16,411.07 MWD+IFR-AK-CAZ-SC(5) 20,359.49 89.42 333.12 7,351.94 7,281.05 16,426.55 -4,113.91 5,982,376.85 345,602.09 0.62 16,503.84 MWD+IFR-AK-CAZ-SC(5) 02.Toe 071815 JB 20,362.43 89.41 333.10 7,351.97 7,281.08 16,429.17 -4,115.23 5,982,379.49 345,600.82 0.62 16,506.78 MWD+IFR-AK-CAZ-SC(5) 20,457.39 89.48 332.21 7,352.89 7,282.00 16,513.51 -4,158.85 5,982,464.69 345,558.91 0.94 16,601.73 MWD+IFR-AK-CAZ-SC(5) 20,552.74 89.68 332.02 7,353.59 7,282.70 16,597.79 -4,203.44 5,982,549.84 345,516.01 0.29 16,697.06 MWD+IFR-AK-CAZ-SC(5) 20,648.27 89.97 331.72 7,353.88 7,282.99 16,682.04 -4,248.48 5,982,634.96 345,472.68 0.44 16,792.57 MWD+IFR-AK-CAZ-SC(5) 20,743.09 89.30 330.89 7,354.49 7,283.60 16,765.21 -4,294.01 5,982,719.03 345,428.83 1.12 16,887.35 MWD+IFR-AK-CAZ-SC(5) 20,839.11 89.68 328.91 7,355.34 7,284.45 16,848.27 -4,342.16 5,982,803.03 345,382.36 2.10 16,983.22 MWD+IFR-AK-CAZ-SC(5) 20,932.92 89.37 327.28 7,356.12 7,285.23 16,927.91 -4,391.74 5,982,883.64 345,334.39 1.77 17,076.68 MWD+IFR-AK-CAZ-SC(5) 21,028.98 89.92 327.40 7,356.71 7,285.82 17,008.78 -4,443.57 5,982,965.53 345,284.19 0.59 17,172.27 MWD+IFR-AK-CAZ-SC(5) 21,124.90 89.78 328.18 7,356.96 7,286.07 17,089.93 -4,494.70 5,983,047.69 345,234.71 0.83 17,267.79 MVVD+IFR-AK-CAZ-SC(5) 21,219.89 90.16 329.64 7,357.01 7,286.12 17,171.28 -4,543.75 5,983,129.99 345,187.30 1.59 17,362.54 MWD+IFR-AK-CAZ-SC(5) 21,314.92 90.23 331.45 7,356.69 7,285.80 17,254.02 -4,590.48 5,983,213.65 345,142.25 1.91 17,457.48 MWD+IFR-AK-CAZ-SC(5) 21,409.43 90.81 331.39 7,355.83 7,284.94 17,337.01 -4,635.69 5,983,297.52 345,098.71 0.62 17,551.95 MWD+IFR-AK-CAZ-SC(5) 21,505.56 91.45 331.54 7,353.94 7,283.05 17,421.44 -4,681.60 5,983,382.85 345,054.51 0.68 17,648.02 MWD+IFR-AK-CAZ-SC(5) 21,600.74 89.95 329.74 7,352.77 7,281.88 17,504.39 -4,728.26 5,983,466.71 345,009.53 2.46 17,743.11 MWD+IFR-AK-CAZ-SC(5) 21,694.56 89.30 330.19 7,353.39 7,282.50 17,585.61 -4,775.22 5,983,548.85 344,964.21 0.84 17,836.79 MWD+IFR-AK-CAZ-SC(5) 21,790.87 89.34 329.37 7,354.53 7,283.64 17,668.82 -4,823.69 5,983,633.01 344,917.42 0.85 17,932.94 MVVD+IFR-AK-CAZ-SC(5) 21,885.81 88.79 328.93 7,356.08 7,285.19 17,750.32 -4,872.37 5,983,715.46 344,870.39 0.74 18,027.66 MWD+IFR-AK-CAZ-SC(5) 21,985.54 90.08 332.33 7,357.06 7,286.17 17,837.21 -4,921.27 5,983,803.31 344,823.25 3.65 18,127.28 MWD+IFR-AK-CAZ-SC(5) 22,077.57 89.82 333.54 7,357.14 7,286.25 17,919.16 -4,963.14 5,983,886.08 344,783.03 1.34 18,219.31 MWD+IFR-AK-CAZ-SC(5) 22,172.00 90.23 338.29 7,357.10 7,286.21 18,005.34 -5,001.67 5,983,973.01 344,746.24 5.05 18,313.59 MWD+IFR-AK-CAZ-SC(5) 22,267.46 91.33 342.11 7,355.80 7,284.91 18,095.13 -5,033.99 5,984,063.43 344,715.73 4.16 18,408 27 MWD+IFR-AK-CAZ-SC(5) 12122/2015 3:13:50PM Page 8 COMPASS 5000.1 Build 74 • ConocoPhillips • Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-09 Project: Western North Slope TVD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Rig:34.2+36.69 @ 70.89usft(Doyon 19) Welt: CD5-09 North Reference: True Wellbore: CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/-S +E/-W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100) (ft) Survey Toot Name 22,357.66 92.69 344.76 7,352.64 7,281.75 18,181 53 -5,059.69 5,984,15031 344,691 77 3.30 18,496.91 MVD+IFR-AK-CAZ-SC(5) 22,450.47 92.60 344.09 7,348.36 7,277.47 18,270.83 -5,084.59 5,984,240.09 344,668.67 0.73 18,587.79 MWD+IFR-AK-CAZ-SC(5) 22,545.90 94.13 343.79 7,342.76 7,271.87 18,362.38 -5,110.94 5,984,332.14 344,644.16 1.63 18,681.32 MWD+IFR-AK-CAZ-SC(5) 22,645.88 94.05 339.66 7,335.62 7,264.73 18,457.05 -5,142.20 5,984,427.42 344,614.81 4.12 18,779.87 MWD+IFR-AK-CAZ-SC(5) 22,745.10 92.44 334.33 7,330.00 7,259.11 18,548.20 -5,180.91 5,984,519.31 344,577.94 5.60 18,878.65 MWD+IFR-AK-CAZ-SC(5) 22,840.21 93.04 331.02 7,325.45 7,254.56 18,632.59 -5,224.51 5,984,604.55 344,536.04 3.53 18,973.63 MWD+IFR-AK-CAZ-SC(5) 22,937.16 90.67 325.02 7,322.31 7,251.42 18,714.73 -5,275.80 5,984,687.71 344,486.41 6.65 19,070.12 MWD+IFR-AK-CAZ-SC(5) 23,029.65 89.95 322.48 7,321.81 7,250.92 18,789.32 -5,330.49 5,984,763.36 344,433.24 2.85 19,161.39 MWD+IFR-AK-CAZ-SC(5) 23,126.46 90.35 317.85 7,321.56 7,250.67 18,863.63 -5,392.49 5,984,838.91 344,372.75 4.80 19,255.76 MWD+IFR-AK-CAZ-SC(5) 23,220.21 89.40 312.45 7,321.76 7,250.87 18,930.07 -5,458.58 5,984,906.65 344,308.01 5.85 19,344.96 MWD+IFR-AK-CAZ-SC(5) 23,320.20 85.99 310.97 7,325.78 7,254.89 18,996.54 -5,533.15 5,984,974.60 344,234.79 3.72 19,438.04 MWD+IFR-AK-CAZ-SC(5) 23,371.00 85.99 310.97 7,329.34 7,258.45 19,029.76 -5,571.41 5,985,008.58 344,197 20 0.00 19,485.01 PROJECTED to TD 4-1/2"x 6-1/2" 23,381.00 85.99 310.97 7,330.04 . 7,259.15 19,036.31 -5,578.94 5,985,015.27 344,189.81 0.00 19,494.26 PROJECTED to TD Projection to Bit • -- 12/22/2015 3:13:50PM Page 9 COMPASS 5000.1 Build 74 111 S Final Definitive Survey Verified and Signed-off All targets and/or well position objectives have been achieved. Hi Yes ❑ No 1 have checked to the best of my ability that the following data is correct: El Surface Coordinates Declination & Convergence RI GRS Survey Corrections E] Survey Tool Codes Digitally signed by Abdou Abakar Abdou Abakarem =AbdouoAbkor@o=xhlor.onocopn, mail=Abdou.Abakar@con[ra<tor.conocoph c=DS SLB DE: Date:le:2015.12.2215:22:03-09'W' Digitally signed by Will Earhart DN:cn=Will Earhart,o,ou,email=william.c.earhart@cop.com,o-U5 Client Representative: Date 2015.12.221529:53-09'W' Date: • COri1 Cement Detail Report &Wens CD5-09 CcartocoPhiilips String: Conductor Cement Job: DRILLING ORIGINAL, 11/20/2015 06:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Conductor Cement 3/28/2015 08:00 3/28/2015 08:30 CD5-09 Comment 5 yards of redi-mix,50/50 sand/gravel,4,100 Ib/yd3 Cement Stages Stage#1 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug? Conductor Cement 36.7 115.0 Yes No No Q Pump!nit(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 5 0 3 23.7 No No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) 131/2 Comment 5 yards of redi-mix,50/50 sand/gravel,4,100 Ib/yd3 Cement Fluids&Additives Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Yield(W/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 1/20/2016 • Cement Detail Report >reljs CD5-09 +CornocoPhil lips String: Surface Job: DRILLING ORIGINAL, 11/20/2015 06:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Surface 11/23/2015 08:30 11/23/2015 11:00 CD5-09 Comment PJSM. Surface cement job: Dowell pump 1.0 bbls H2O and test lines to 2,500 psi-good, Dowell pump 71.3 bbls 10.5 ppg Mud Push II, Drop bottom plug, Dowell pump 9 bbls of 11.0 ppg scavenger slurry,372.2 bbls total 11.0 ppg Lead DeepCRETE cement plus additives, 1.91 ft3/sk yield at 5.7 bpm,250-440 psi. Dowell pump 57 bbls, 15.8 ppg,"G", 1.17 ft3/sx Tail cement at 3.3-4.4 bpm/580-170 psi. Drop top plug. Dowell pump 10 bbls H2O. Rig displace with 212 bbls of 10.0 ppg DrillPlex spud mud with YP=19. Initial 8 bpm at 890 psi,decreasing to 3 bpm at 500 psi. Increase to 500 psi over at 1,000 psi and hold for 5 min. Check floats-good. Full returns throughout 218 bbls good cement back to surface. Reciprocated pipe with 10'stroke until MudPush exited shoe.Stopped reciprocating due to excess drag and hole appearing to get sticky.CIP at 11:06 hrs, 11/23/15. Cement Stages Stage#1 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug? Surface 36.7 2,409.0 Yes 218.0 Yes Yes Q Pump!nit(bbl/m...Q Pump Final(bbl/... Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 4 2 6 250.0 500.0 Yes 10.00 No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) 9 7/8 Comment Lead= 11.0 ppg DeepCrete,Tail=15.8 ppg"G" Cement Fluids&Additives Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Scavenger Scavenger Slurry 36.7 36.7 27 DeepCRETE 9.0 Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) 1.91 6.76 0.00 11.00 189.0 5.00 50.0 Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Lead Cement Lead Slurry 36.7 1,945.0 1,094 DeepCRETE 372.2 Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) 1.91 6.76 0.00 11.00 189.0 5.00 50.0 Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Tail Cement Tail Slurry 1,945.0 2,409.0 279 Class G 58.2 Yield(fV/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) 1.17 5.14 0.00 15.80 3.00 500.0 Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 1/20/2016 Cement Detail Report Wa CD5-09 ConocoPnjHips String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 11/20/2015 06:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 12/5/2015 09:00 12/8/2015 10:15 CD5-09 Comment Plugs did not bump on 1st stage. Pumped 6000 stks max. Cement Stages Stage#1 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement...Top Plug? Btm Plug? Intermediate Casing Cement Shoe to 500' 12,348.0 13,271.7 Yes Yes Yes Cement above Alpine C Q Pump!nit(bbl/m...Q Pump Final(bbl/...Q Pump Avg (bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 7 3 6 340.0 No No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) 6 1/2 Comment Cement Fluids&Additives Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Intermediate Cement Class G,1.16 yld 12,348.0 13,271.7 397 G 82.0 Stage 1 Intermediate Blend Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa-s) Thickening Time(hr) CmprStr 1(psi) 1.16 5.09 0.00 15.80 4.50 500.0 Additives Additive Type Concentration Conc Unit label Stage#2 Description Objective Top Depth(ftKB) Bottom Depth(ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing Isolate Qannik 5,445.0 7,358.0 Yes Yes No Cement Q Pump!nit(bbl/m...Q Pump Final(bbl/...Q Pump Avg(bbl/... P Pump Final(psi) P Plug Bump(psi) Recip? Stroke(ft) Rotated? Pipe RPM(rpm) 7 4 7 770.0 1,670.0 No No Tagged Depth(ftKB) Tag Method Depth Plug Drilled Out To(ftKB) Drill Out Diameter(in) 6 1/2 Comment Cement Fluids&Additives Fluid Fluid Type Fluid Description Estimated Top(ftKB) Est Btm(ftKB) Amount(sacks) Class Volume Pumped(bbl) Intermediate Cement Class G,1.16 yld 5,445.0 7,358.0 800 G 163.5 Stage 2 Intermediate Blend Yield(ft'/sack) Mix H2O Ratio(gal/sa... Free Water(%) Density(lb/gal) Plastic Viscosity(Pa•s) Thickening Time(hr) CmprStr 1(psi) 1.16 5.09 15.80 5.00 500.0 Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 1/20/2016 OF Tj 11111S �s� THE STATE Alaska Oil and Gas of 1 � CTJSKA Conservation Commission 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 Main: 907.279.1433 o f ALAS'P' Fax: 907.276.7542 www.aogcc.alaska.gov Graham Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage,AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-09 ConocoPhillips Alaska, Inc. Permit No: 215-177 (revised) Surface Location: 339' FNL, 2593.33' FEL, SEC. 18, T11N, R4E, UM Bottomhole Location: 2373.61' FNL, 3194.14' FEL, Sec. 25, T12N, R3E, Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, f Daniel T. Seamount, Jr. !_ Commissioner DATED this 11 day of December, 2015. STATE OF ALASKA Al"OIL AND GAS CONSERVATION COM113NN 0 DEC 0 v 2015 ,. PERMIT TO DRILL ,;-ivy 20 AAC 25.005 G CC 1 a.Type of Work: 1 b.Proposed Well Class: Exploratory-Gas ❑ Service- WAG ❑ Service-Disp ❑ 1 c.Specify if well is proposed for: Drill ❑✓ • Lateral ❑ Stratigraphic Test ❑ Development-Oil ❑✓ • Service- Winj ❑ Single Zone ❑• Coalbed Gas ❑ Gas Hydrates ❑ Redril❑ Reentry ❑ Exploratory-Oil ❑ Development-Gas ❑ Service-Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket ❑ , Single Well ❑ 11.Well Name and Number: ConocoPhillips Alaska, Inc. • Bond No. 59-52-180 ' CRU CD5-09 3.Address: 6.Proposed Depth: 12.Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 23381 • TVD: . 7290 Colville River Unit 4a. Location of Well(Governmental Section): 7.Property Designation(Lease Number): Alpine Pool - Surface: 339'FNL,2593.33' FEL,Sec. 18,T11 N,R4E,UM . ASRC NPR4,ASRC NPR2,ASRC NPR1 Top of Productive Horizon: 8.Land Use Permit: 13.Approximate Spud Date: 892.18'FNL,3284.59'FEL,Sec.6,T11N,R4E, UM 932669,932128,932126 11/21/2015 Total Depth: 9.Acres in Property: 14.Distance to Nearest Property: 2373.61'FNL,3194.14'FEL,Sec.25,T12N,R3E, UM 15912, 12614.53,27783.48 341 to ASRC-NPR4 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10.KB Elevation above MSL(ft): • 70.5 15.Distance to Nearest Well Open Surface: x-349385 y- 5965872.31 Zone- - 4 GL Elevation above MSL(ft): ' 34.2 to Same Pool: 2232.83' 16.Deviated wells: Kickoff depth: • 385 feet 17. Maximum Potential Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: . 90.75 degrees Downhole: 3650 • Surface: 2918 • 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 74 36 36 110 110 Previously Installed 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2408.6 36 36 2444.6 2165.5 1.083 sx 11.0ppg DeepCrete,271 sx 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7/39 L-80/TN110 H-563/BTC 13165.2 36 36 13201.2 7412.5 Stagel:365 sx15.8 ppg G;Stage2:461 sx 15.8 ppg G 6-1/2" 4-1/2" 12.6 L-80 IBTM 10381 13,000 7,399 23381 7290 N/A-uncemented liner with frac sleeves 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect.Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program ❑ Time v.Depth Plot El Shallow Hazard Analysis Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑ 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 12/2/2015 22.I hereby certify that the foregoing is true and the procedure approved herein will not Will Earhart 265-1077 44 C.V. be deviated from without prior written approval. Contact William.C.EarhartCa�cop.com Email Printed NameGi rw.:c-q, ;4c•t) Title ‘),,-,.a,,,0 M"4„r Signature /.4. C-, @pi. Phone 2 6•5,_ 6 f'Lv Date /2.0-(2.0 Commission Use Only Permit to Drill API Number: Permit ApprovalSee cover letter for other Number: a j '1`l p& 5°-I3 - O7 , 3 -op -OQ Date: l( I 3116 requirements. W Conditions of approval:to V If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: Other: ,3P t CS f to 35.0c 51• Samples req'd: Yes❑ NoR/ Mud log req'd:Yes❑ No Q' rtvtyrezr 77-51 ZSLay5! ffnr2 via H2 measures: Yes VI.No❑" Directional svy req'd:Yes R No ED✓«t r,- '� 1it/ h fc c gra ra 7/td Spacing exception req'd: Yes❑ No[ Inclination-only svy req'd:Yes❑ No 7 (/!r1 G/t•r .2 .i}-.1-c ZS 0 3i )(Z j Post initial injection MIT req'd:Yes❑ No[1] / APPROVED BY Approved by:,\ / mpAs I P,, E OMMISSION Date: I Z' 11 1S 1.-77.1.-77. !?/q// e n� 14411 ♦ � 1 4 Submit Form and Form 10-401(Revised 11/2015) This permit �id for 24 mon hs from the date of approval(20 AAC 25.005(g)) Attachments in Duplicate ConocoPhillips Alaska,Inc. Post Office Box 100360 Anchorage,Alaska 99510-0360 ConocoPhillips Telephone 907-276-1215 December 1,2015 RE Alaska Oil and Gas Conservation Commission �����® 333 West 7th Avenue, Suite 100 DEC 0 2 2015 Anchorage,Alaska 99501 Re: Revision to Permit to Drill 215-177(CRU CD5-09) AOGCC Dear Sir or Madam: ConocoPhillips Alaska,Inc.hereby applies for a revision to the approved Permit to Drill 215-177 for an onshore production well from the CD5 drilling pad with rig Doyon 19. / It is desired to extend the production lateral of CRU CD5-09 to a new total depth of 23,381' MD in order to potentially access more reserves.All other well designs as outlined in the approved PTD still stand. The 6-1/2"production section will then be horizontally drilled and completed as an Alpine A sand producer.The well will be completed with a 4-1/2"solid liner with frac sleeves across the productive zone and tied back to surface with a 3-1/2"gas- lifted upper completion string. It is still the intention of ConocoPhillips to hydruallically fracture CD5-09 at a later date. Please find attached the information required by 20 AAC 25.005 (a) and(c) for your review. Pertinent information attached to this application includes the following: 1. Revised Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A revised proposed drilling program 3. A revised proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling/collision avoidance information as required by 20 AAC 25.050(b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a)and(b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. Rig Doyon 19 is currently drilling the intermediate hole section of CRU CD5-09. After running the intermediate casing,it is anticipated that the production hole section will be spud on 12/7/2015. If you have any questions or require further information,please contact Will Earhart at 265-1077 (William.C.Earhart@cop.com)or Chip Alvord at 265-6120. Sincerely, cc: CD5-09 Well File/Ann Haggerty Sherrod ATO 1530 Rob Stinson ATO 1720 Chip Alvord ATO 1570 Will Earhart Jason McLennan ATO 1712 Drilling Engineer Lanston Chin Kuukpik Corp • Application for. to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 CD5-09 Application for Permit to Drill Document Revision to Ap i roved PTD 215-177 Drilling &Wells ConocoPhillips Table of Contents 1. Well Name 3 Requirements of 20 AAC 25.005(f) 2. Location Summary 3 Requirements of 20 AAC 25.005(c)(2) Requirements of 20 AAC 25.050(b) 3. Blowout Prevention Equipment Information 3 Requirements of 20 AAC 25.005(c)(3) 4. Drilling Hazards Information 4 Requirements of 20 AAC 25.005(c)(4) 5. Procedure for Conducting Formation Integrity Tests 5 Requirements of 20 AAC 25.005(c)(5) 6. Casing and Cementing Program 5 Requirements of 20 AAC 25.005(c)(6) 7. Diverter System Information 5 Requirements of 20 AAC 25.005(c)(7) S. Drilling Fluid Program 6 Requirements of 20 AAC 25.005(c)(8) 9. Abnormally Pressured Formation Information 7 Requirements of 20 AAC 25.005(c)(9) 10. Seismic Analysis 7 Requirements of 20 AAC 25.005(c)(10) 11. Seabed Condition Analysis 7 Requirements of 20 AAC 25.005(c)(11) CD5-09 APD Page 1 of 15 Printed:2-Dec-15 • Application for 1111 to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 12. Evidence of Bonding 7 Requirements of 20 AAC 25.005(c)(12) 13. Proposed Drilling Program 7 Requirements of 20 AAC 25.005(c)(13) 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 9 Requirements of 20 AAC 25.005(c)(14) 15.Attachments 10 Attachment 1 Cement Summary 11 Attachment 2 Drilling Hazards Summary 11 Attachment 3 Completion Schematic 15 Attachment 4 Directional Plan 16 CD5-09 APD Page 2 of 15 Printed:2-Dec-15 • Application for 1111 to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 1. Well Name (Requirements of 20AAC25.005(f)) The well for which this application is submitted will be designated as CRU CD5-09. 2. Location Summary(Requirements of 20 AAC 25.005(c)(2)) This well is planned for Location at Surface 339' FNL, 2593.33' FEL,Sec. 18,T11N, R4E, UM NAD 1927 RKB Elevation 70.5'AMSL Northings: 5,965,872. Eastings: 349,501 Pad Elevation 34.2'AMSL Top of Productive Horizon(Heel) 892.18' FNL, 3284.59' FEL,Sec. 6,T11N, R4E, UM NAD 1927 Measured Depth, RKB: 13,105' Northings:5,975,891 Total Vertical Depth, RKB: 7,407.5' Eastings:348,856 Total Vertical Depth,SS: 7,337' Total Depth (Toe) 2373.61'FNL, 3194.14'FEL,Sec. 25,T12N, R3E, UM NAD 1927 Measured Depth, RKB: 23,381' Northings: 5,985,065 Total Vertical Depth, RKB: 7,290' Eastings: 344,246 Total Vertical Depth,SS: 7,219' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19. CD5-09 APD Page 3 of 15 Printed:2-Dec-15 • Application for.to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 4. Drilling Hazards Information (Requirements of 20AAC25.005(c)(4)) The following presents data used for calculation of anticipated surface pressure(ASP)during drilling of this well: Casing Size Csg Setting Depth Fracture Pore pressure ASP Drilling (in) MD/TVD(ft) Gradient(ppg) (psi) (psi) 20 110/110 10.9 50 51.3 10.75 2,444.6/2,165.5 14.5 1061 1416.2 7.625 13201.2/7,412.5 12.5 3545 2917.8 4.5 23,381/7,290 12.5 3650 - N/A PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE(ASP) ASP is determined as the lesser of 1)surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2)formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP=[(FG x 0.052)-0.1]*D Where: ASP=Anticipated surface pressure in psi FG=Fracture gradient at the casing seat in lb/gal 0.052=Conversion from lb./gal to psi/ft 0.1=Gas gradient in psi/ft D=True vertical depth of casing seat in ft RKB OR 2) ASP= FPP-(0.1 x D) Where: FPP=Formation Pore Pressure at the next casing point FPP=0.4525 x TVD 1. ASP CALCULATIONS 1. Drilling below 20"conductor ASP= [(FG x 0.052)-0.1] D _ [(10.9x0.052)-0.1]x 110=51.3 psi OR ASP=FPP-(0.1 x D) = 1061-(0.1 x 2165.5') =844.5 psi 2. Drilling below 10-3/4"surface casing ASP= [(FG x 0.052)-0.1] D =[(14.5 x 0.052)-0.1]x 2165.5'=1416 psi OR ASP=FPP-(0.1 x D) =3545-(0.1 x 7412.5')=2739 psi 3. Drilling below 7-5/8"intermediate casing ASP=[(FG x 0.052)-0.1] D = [(12.5 x 0.052)-0.1]x 7412.5'=4076.9 psi OR ASP= FPP-(0.1 x D) =3650-(0.1 x 7322.5')=2917.8 psi , CD5-09 APD Page 4 of 15 Printed:2-Dec-15 • Application for PO to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 (B)data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C)data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones,and zones that have a propensity for differential sticking; Please see Attachment 2-Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005(c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing Program Csg/Tbg Hole Weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program OD(in) Size(in) (lb/ft) (ft) (ft) (ft) 20 42 94 H-40 Welded 80 36/36 110/110 Previously Installed HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,385 36/36 2,444/2,165 1083 sx DeepCRETE Lead 11.0 ppg, BTCM 271 sx Class"G"Tail Slurry 15.8 ppg 29.7/39 7-5/8 9.875x1 (last L-80/ HYD 563 14,457 36/36 13,201.2/ Stage 1: 365 sx Class G at 15.8 ppg 1 400ft TN110 X BTCM 7,412 Stage 2: 461 sx Class G at 15.8 ppg 39#) 4-1/2 6.5 12.6 L-80 IBT-M 6,699 13,000/ 23,381/ N/A—uncemented liner with frac 7,399 7,290 sleeves 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h)(2) is granted. At CD5,five penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. CD5-09 APD Page 5 of 15 Printed.2-Dec-15 • Application for AI to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 8. Drilling Fluid Program (Requirements of 20AAC 25.005(c)(8)) Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.5 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0—10.0 9.6—11.5 9.6 PV cP 9 14 11-15 YP lb./100 ft2 35-80 11-16 13-16 Funnel Viscosity s/qt. 300 50-60 40-50 Initial Gels lb./100 ft2 50 10 6 10 Minute Gels lb./100 ft2 60 15 8 API Fluid Loss cc/30 min. N.C.—10.0 5.0-10.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0—12.0 <10.0 pH 10.8-11.2 9.5-10.0 9.0-9.5 Surface Hole: A mixed-metal oxide fresh water drilling fluid (DrilPlex AR)will be used for the surface interval. Keep flow line viscosity at±200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight< 10.0 ppg by use of solids control system and dilutions where necessary. Intermediate#1: Fresh water gel/polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids(by diluting as required)will all be important in maintaining wellbore stability.The mud will be weighted up to 11.5 before pulling out of the hole. Note: Managed Pressure Drilling(MPD)will be utilized for added backpressure to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with a water-based mud drill-in fluid (Flo-Pro NT)weighted to 9.6 ppg with calcium carbonate and KCI. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-09 APD Page 6 of 15 Printed:2-Dec-15 Application for. to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A-Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20AAC25.005(c)(10)) N/A-Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20AAC25.005(c)(11)) N/A-Application is not for an offshore well. 12. Evidence of Bonding(Requirements of 20AAC25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3:Completion Schematic. 1. MIRU Doyon 19 onto CD5-09. 2. Rig up and test riser, dewater cellar as needed. 3. Drill 13.5" hole to the surface casing point as per the directional plan (LWD Program:GR).../ 4. Run and cement 10-3/4"surface casing to surface. 5. Install BOPE and MPD equipment. 6. Test BOPE to 250 psi low/3500 psi high. 7. Pick up and run in hole with 9-7/8"x 11"drilling BHA to drill the intermediate hole section. 8. Pressure test casing to 3500 psi. 9. Drill out 20' of new hole and perform LOT. Maximum LOT to 18.0 ppg. Minimum LOT required to drill ahead is 12.5 ppg EMW. 10. Drill 9-7/8"x 11" hole to section TD. Use Managed Pressure Drilling to maintain constant bottom hole pressure on connections once drilling the lower shales(LWD Program:GR/Res). 11. Run 7-5/8" casing and cement to 500'above hydrocarbon bearing zones. 12. Test BOPE to 250 psi low/3,500 psi high. 13. Pick up and run in hole with 6-1/2"drilling BHA. Pressure test casing to 3,500 psi. 14. Drill out shoe track and 20 feet of new formation. Perform FIT to 12.0ppg. Minimum required leak-off value is 11.0 ppg EMW. 15. Drill 6-1/2" hole to section TD(LWD Program:GR/Azimuthal Res.). / 16. Pull out of hole with drilling BHA. 17. RIH with 4.5" liner completion (solid liner with frac sleeves)on 4"drill pipe. 18. Set liner top packer and release from liner. 19. Displace well to completion fluid. CD5-09 APD Page 7 of 15 Printed:2-Dec-15 • Application for to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 20. Run 3.5" upper completion. 21. Space out and land hanger. 22. Install 2-way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 23. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2-way check. 24. Test tubing and tubing-casing annulus separately to 3500 psi/30 mins. 25. Shear circulation valve in GLM. 26. Circulate tubing to diesel and install freeze protection in the annulus. 27. Set BPV and secure well. RDMO. CD5-09 APD Page 8 of 15 Printed:2-Dec-15 • Application for to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005(c)(14)) Incidental fluids developed from drilling operations on well CD5-09 will be injected into the surface casing x production casing annulus of CD5-05 and/or CD5-03 and/or CD5-315 wells upon approval.Well CD1-01A will be used as a backup disposal well or for excess fluid volumes. The CD5-09 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000'TVD. Significant hydrocarbon zones include only the Alpine sand based on pre-drill interpretations.There will be 500'of cement fill placed above the top of the Alpine reservoir. Once CD5-09 has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above,any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation(C-40). These 450-500'thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure =(12.0 ppg) * (0.052) * (Surf. Shoe TVD)+1,500 psi =(12.0 ppg) * (0.052) * (2,165')+ 1,500 psi =2851 psi Pore Pressure = 1,061 psi Therefore Differential=2851-1061= 1790 psi. The internal casing pressure is conservative,since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85%collapse and burst ratings listed in the following table: Wt 85%of OD Grade Range Connection Collapse 85%of Burst (ppf) Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563 2470 psi 2100 psi 5210 psi 4429 psi 10-3/4" 45.5 L-80 3 BTC-M 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563 4790 psi 4071 psi 6890 psi 5856 psi 7-5/8" 29.7 L-80 3 BTC-M 4790 psi 4071 psi 6890 psi 5856 psi 7-5/8" 39 TN-110 3 HYD563 11080 psi 9418 psi 12620 psi 10727 psi CD5-09 APD Page 9 of 15 Printed:2-Dec-15 Application for.to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 15. Attachments Attachment 1 Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-09 APD Page 10 of 15 Printed:2-Dec-15 • Application for Fe to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 Attachment 1—Cement Summary CD5-9 Schematic wp_09 20"94#H-40 Welded Conductor to 110' 10-3/4"45.5#L-80 HYD563FBTCM itik 2,444'MD/2,165'TVD 59°inc. Top of Cement 5,425'MD/3,651'TVD K2(Qannik) 5,926'MD/3;953'TVD HES Cementer 0 C a 6,475'MD/4,238 TVD r' 9-7/8"x 11"Hole Top of Cement 12;322'MD/7,223'TVD Alpine C 12,832'MD/7,375'TVD Alpine A 13,105'MD/7,407'TVD 7-5/8"29.7/39#L-80/TN110 AirHYD563 X BTCM Casing IL 13,201'MD!7,412'.TVD @ 87' 6-1/2" Hole 4-1!2" Solid Liner 12.6 ppf L80 IBTM A h. 20,365'.MD./.7,322 @ 91 CD5-09 APD Page 11 of 15 Printed:2-Dec-15 • Application for Fill to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 10.75"Surface Casing run to 2,445'MD/2,166'TVD Cement from 2445' MD to 1943' (500' of tail)with Class G+Adds. @ 15.8 PPG, and from 1943'to surface with 11.0 ppg DeepCRETE.Assume 250%excess annular volume in permafrost, 50%excess below the permafrost (1373' MD), and zero excess in 20"conductor. Lead slurry from 1,901' MD to surface with DeepCRETE @ 11.0 ppg Conductor (110'—0') X 1.3645 ft3/ft X 1.0(0%excess)= 150 ft3 Permafrost to Conductor (1,373'—110')X 0.3637 ft3/ft X 3.5 (250%excess)=1,608 ft3 Top of Tail to Permafrost (1,943'—1,373')X 0.3637 ft3/ft X 1.5 (50%excess)=311 ft3 Total Volume=150+1,608+311=2,069 ft3=>1,083 sx of 11.0 ppg DeepCRETE @ 1.91 ft3/sk Tail slurry from 2,401'MD to 1,901'MD with 15.8 ppg Class G+additives Shoe to Top of Tail (2,445'—1,943')X 0.3637 ft3/ft X 1.50(50%excess) =274 ft3 Shoe Joint (80')X 0.5400 ft3/ft X 1.0(0%excess)=43 ft3 Total Volume=274+43=317 ft3=>271 sx of 15.8 ppg Class G+0.2%D046 antifoamer,0.3% D065 dispersant and 0.8%5002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 13,201' MD/7,413'TVD Top of slurry is designed to be at 12,605' MD,which is 500' above the Alpine C.Assume 40%excess annular volume. Tail slurry from 14,493' MD to 13,684' MD with 15.8 ppg Class G+additives Under reamer to Top of Cement (13,096'—12,322')X 0.3439 ft3/ft X 1.40(40%excess) =368 ft3 Shoe to Under reamer (13,201'—13,096')X 0.2148 ft3/ft X 1.40(40%excess) =32 ft3 Shoe Joint (80')X 0.2578 ft3/ft X 1.0(0%excess)=21 ft3 Total Volume=368+32+21=420 ft3=>365 sx of 15.8 ppg Class G+0.2%D046 antifoamer,0.3% D065 dispersant and 0.8%5002 accelerator @ 1.16 ft3/sk Qannik Second Stage from 6893-5853 MD with 15.8 ppg Class G+additives 1050' MD Across Qannik (6,475'—5,425')X 0.3637 ft3/ft X 1.40(40%excess) =535 ft3 Total Volume=535 ft3=>461 sx of 15.8 ppg Class G+0.2% D046 antifoamer,0.3%D065 dispersant and 0.8%S002 accelerator @ 1.16 ft3/sk CD5-09 APD Page 12 of 15 Printed:2-Dec-15 Application for to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 Attachment 2—Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 13-1/2" Hole/10-3/4"Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots,traveling cylinder diagrams Monitor well at base of permafrost, increased mud weight, Gas Hydrates Low decreased mud viscosity, increased circulating times,controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Reduced pump rates, mud rheology, lost circulation material, use of Lost Circulation Low low density cement slurries 9-7/8"x 11" Hole/7-5/8"Casing Interval Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density(ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. No mapped faults occur across the path of the planned wellbore. Hydrogen Sulfide gas Low H2S drills,detection systems, alarms,standard well control practices, mud scavengers 6-1/2"/4-1/2" Liner Production Interval Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density(ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms,standard well control practices, mud scavengers CD5-09 APD Page 13 of 15 Printed:2-Dec-15 • Application for to Drill Revision,Well CRU CD5-09 Saved: 2-Dec-15 Well Proximity Risks: Directional drilling/collision avoidance information as required by 20 ACC 25.050(b)is provided in the following attachments. Drilling Area Risks: Reservoir Pressure:Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely,the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik and instability in the production interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-09 APD Page 14 of 15 Printed:2-Dec-15 • Application for F.to Drill Revision,Well CRU CD5-09 Saved:2-Dec-15 Attachment 3—Completion Schematic CD5-09 Alpine A Producer Proposed Schematic updated 12/1/2015 by R.blakney 20"94#H-40 Welded Conductor to 110' Upper Completion: Length 1 1)4-'/2' 12.6#/ft IBT-M Tubing(2 jts) XO to 3-'/z'EUE tubing 2)Shallow nipple profile 3)3-1/2"x 1"Camco KBMG GLM (xx°)w/DV 7' J p 10-3/4"45.5#L-80 Hyd 563/BTC 4)3-'/2'x 1"Camco KBMG GLM(xx°)w/DV 7' Surface Casing 2,444'MD/2,165'TVD @ 59° 4)3-1/2"x 1"Camco KBMG GLM(xx°)w/DCK2 7' cemented to surface pinned for 2500 psi casing to tbg shear 5)SLB BHP Gauge, Encapsulated I-Wire 1.5' w/cannon clamps on every joint 6)Baker Premier Packer 7)X nipple 2.812"ID 1.5' 8)WLEG 1.5' Lower Completion: 9) Flexlock Liner Hanger 37' XO 5"Hydril 521 Box X 4-1/2"IBTM pin 10)4 1/2", 12.6#/ft, L-80 IBT-M Liner w/10 ball actuated frac ports every until 21,275'MD 11)Perforated pup @ toe(23,380'MD) GL Baker Premier Production Packer Top Reservoir at+1- Alpine A Sand 7407'TVD o o o o o o o o 0 op 411 6 1/2"Hole TD 23,381'MD/7,289'TVD 7 5/8"29.7/39#I-80/TN110 4-W'12.6#L-80 HYD 563xBTCM IBT-M Intermediate Casing Production Liner 13,201'MD/7412'TVD @ 87° 13,100'MD/7399'TVD to 23,381'MD/7,289'TVD @ 90.5° CD5-09 APD Page 15 of 15 Printed:2-Dec-15 ..... CD5-O9wpll 7.086 Plan Summary - HRZ Base/Top KalubikK-1/Lower Kalubik - C-30 LCU Alpine A ›.5- \ -5 - Kuparuk C - c - _ m d - -s _.. °‘JLLTOOI22OO Alpine C/UJU K3 Basal B Parafrost' K-2 Qannik. 0 20 \1/4 \ , - "x -1by 11 r"-:=110'' Geodetic Datum: North American Datum 1983 -�\\\1*iliw.. ---- 20'x42' Depth Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) +i 3°o$ ___110-3/4"x 13-1/4 Rig: Doyon 19 ../-,A . 11-. 11'1.1111 -- I o e °'-poi a° / a o '� boa a4 o pya 000 foo oop17 5(8„x 9-7/8"by 11 f14-112x61121 o oI /� 3 ./ T lYUS TI a1 -+T NT NN/ N/ N I I I I I I I I I I d ACy I d� Of g S Id I ab. I 00 2500 5000 7500 1000 012 J0 0 15009 0175b0° 0i00c000 0 85 "-- 385 Horizontal Departure570 - 760 330 30 760 - 950 e _____.___.---- __ 950 - 1140 c _ ... ____ _... . ..._ 1140 - 1330 O .. N 60 °:\ 300 n Bp 1330 - 1510 '' 1510 - 1700 CO ` .�. -_ _. ... ..... la= 1700 - 2600 I' CSD 5-07wp09 2600 3500 C. 3500 - 4400 �.GA5•12wp07 - 4400 _ U 30- v . \ .-_ .__ -_.- '- 270 ,,,- - ® 5300 5300 5300 O t 'D5-06wp09 - : .. _ _. .iii maw io 6200 - 7100 E.2 _.. p5-10wp09 at _.. _ ____ a 7.1',grid 7100 - 8000 CD5=11wpu y : i�0ir 8000 - 8900 0 I 1 1 1 1 1 FIIJIJI 1 1 1 1 I 1 i 1 1 ✓ tf i I„ //��<� 8900 - 10710 0 3000 6000 9000 12000 15000 18000 21000 240 `y %/o►� 720 10710 - 12520 „i1,- i .d ry SURVEY PROGRAM 4, % r��i/1r " I7 12520 - 14330 _ Surface Location �� syr„�"7,,,,i,00,1,-:,.. ��. 14330 - 16140 Depth From Depth To Survey/Plan Tool Pad Elevation: 34.20 -' .: .. 0. ��a+j%� 16140 - 17950 30.00 550.00 CD5-09wp11(Rig CD5-09) D210 -_'"'-'a'!i�s�,,m.Ared`,�0 17950 19780 550.00 1550.00 CD5-09wp11(Rig CD5-09) MWD 550.00 2409.72 CD5-09wp11(Rig CD5-09) MWD+IFR-AK-CAZ-SC 180 19760 21570 36.30 550.00 CD5-09wp11(Rig CD5-09 GYD-GC-SS CASING DETAILS 21570 - 23381 2409.72 3909.72 CD5-09wp11(Rig CD5-09 MWD 2409.72 13207.07 CD5-09wp11(Rig CD5-09 MWD+IFR-AK-CAZ-SC ND MD Name -la 13207.07 14707.07 CD5-09wp11Rig CD5-09 MWD 110.00 110.00 20"x 42" Magnetic Model: BGGM2015 T 13207.07 23381.41 CD5-09wp11(Rig CD5-09 MWD+IFR-AK-CAZ-SC 2165.50 2409.72 10-3/4"x 13-1/2" Magnetic Model Date: 21-Nov-15 7412.50 13207.07 7-5/8"x 9-7/8"by 11" Magnetic Declination: 17B1° 7289.50 23381.41 4-12"S 6-1/2" To convert a Magnetic Direction to a True Direction,Add 17.91°East SECTION DETAILS - 1350.5 Sec MD Inc Azi TVD ON/-S *E/-W Dleg TFace VSect Target Annotator 1 36.30 0.00 0.00 36.30 0.00 0.00 0.00 0.00 0.00 Base Permafrost 2 385.00 0.00 0.00 385.00 0.00 0.00 0.00 0.00 0.00 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 3 600.11 3.23 340.00 600.00 5.69 -2.07 1.50 340.00 6.01 Start 2.5°/100'DLS,Cr'TF,for 719.7' 4 1319.82 21.22 340.00 1300.50 148.29 -53.97 2.50 0.00 156.63 Hold for 107.27' -2325.5 5 1427.09 21.22 340.00 1400.50 184.77 -67.25 0.00 0.00 195.16 Start 3.87"/100'DLS,24.6°TF,for 716.91' 6 2144.00 47.79 355.17 1986.98 578.99 -135.33 3.87 24.60 577.32 Hold for 265.72' 7 2409.72 47.79 355.17 2165.50 775.11 -151.91 0.00 0.00 759.59 Adjust TF to 0°,for 20' 8 2429.72 47.79 355.17 2178.94 789.87 -153.16 0.00 0.00 773.31 Start 3.87°/100'DLS,11.7°TF,for 308.07' 9 2735.79 59.43 357.94 2360.23 1035.37 -167.50 3.87 11.70 998.56 Hold for 9319.2' C-30 li 10 12054.98 59.43 357.94 7100.41 9053.77 -456.15 0.00 0.00 8274.06 Start 3.5°/100'DLS,-46.88°TF,for 1056.55' 11 13111.54 87.00 331.86 7407.50 10006.80 -730.96 3.50 -46.88 9247.97 CD5-09 01.Heel 071615 JB Hold for 95.54' 12 13207.07 87.00 331.86 7412.50 10090.92 -775.97 0.00 0.00 9343.36 Adjust TF to 0°,for 20' 13 13227.07 87.00 331.86 7413.55 10108.53 -785.39 0.00 0.00 9363.33 Start 4°/100'DLS,0°TF,for 93.87' 14 13320.94 90.75 331.88 7415.39 10191.27 -829.65 4.00 0.00 9457.14 Hold for 7049.52' -37 37VA 15 20370.46 90.75 331.86 7322.52 16406.72 -4154.61 0.00 0.00 16504.64 CD5-09 02.Toe 071615 JB Start 0.07°/100'DLS,96.87°TF,for 3010.95' K2 Basal 16 23381.41 90.50 333.95 7289.50 19086.88 -5525.88 0.07 96.87 19515.23 CD5-09 03.TD 112515 DK TD:23381.41'MD,7289.5'TVD -4305.5 Albian 97 -5390.5 Permit Pack Minor Risked Albian 96 -69. 1i'Te /UJU kitgg�l p 16ik "0 Aine E signing this I acknowledge that I have been informed of all risks,checked that the data is correct,ensured it's completeness,and all surrounding wells are assigned to the proper position and I approve the scan and ollision avoidance plan as set out in the audit pack.I approve it as the basis for the final well plan and wellsite drawings.I also acknowledge that,unless notified otherwise,all targets have a 100 feet lateral tolerance. Prepared by: Checked by: Accepted by: Approved by: Vinent Osara Nate Beck lfeanyi Ifesie m v v � m _ Q. N N N • d• dm N M Nov, ing (5012 usqt/in) o 53 J / ` • 0 M fm 0 M L - � ° ir/ pv,,it \ -t , / f.' J o 0 U 1- U Z`� U U,1"-/ / .kilill X \ c-,, ,_ .e.- ior,,,,--. 700711prAi \‘, ..p. 0 .- (c, ("J .' ii: ---/ f c:, 0 ,72 ,,,„„1, ,i • _ .CL 1 • 10 0L.0 Ali frI `- m M to I cv U r N D 0 N do U U M U r; 0 4 rM- 0 1/ U N U ii ., co .;:7 11. Al N _ o Z S Ni" U o c 0 LA y U U co M o 6i lik m - M IvQ I N / M1 i ." Co Q �n o . // 0 C CU 0 p l�����W QQ 1%// W U. U C3 c ,n , o Z5 a) U , 03a n CI- 0) a a o Lo Lo o — N U \ 0 Q.) 00 c Q. LO a t ) /lb il b 0 0 N 0 M LC E o Q z I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I M (uig;sn 0005) fui43JoN ___________e_______. 6 .„.. CO o CO O o s m N- 5 LU ti o Qo co N.- co o ■N 0o 71) Z 2 0 0 m o z (0 0 0 ; m o o 0 o -0 0a.. 03 . a co Q 4.. NO ' 0 I / 0 O p O � ' O O O O O C V i ti CO CO Gar —O .eL. " e = (13 .30 IoO + I O CO %.0N N 9- 0 / = + O 0 1r M X O +�' O , Q 1 _a X NN i is X o NLc) O p X _ Vila CLI 1.0❑ V U 0 0 O _o in 7 Z.: 0 -Ln N- I 0 0 0 0 0 0 O 0 0 0 0 in O Ln oo in (u!/}.jsn ()Ogg) (+)ujaoN/(-)qjnoS cn • • 0 0 o 0 ' x3- 81 N CD5-09wp11 f-3-000 `�' P-2000 C° o x o Cl\ N f-- W ►T000 / d 90000 C o 0 O 19000 --o • *a 18000 V a) ,4000 0 V r -`nc N 16000 15000 0 o 0 14000 —o °core 0 0 o OOcei O%i9 co 00 c�a 0 10 �zO o 0000 >N- 0 �. , s). a) 0006 bo ro U 00i0x O a) 00°,6,c, o IT<, L !' 0009 1-1- CL ` CL 0006 \ 000t. a 43) 0 N O 0 000 I0 6 o _ C.1 Q r , � ��4 , (h o N X 1 X co b N 0N O O O O O O O O N O O O O O LO LU O I O NN LU ti O (ui/T3sn 0092) y}de ieainae en-11 • • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-09 Rig: CD5-09 Plan: CD5-09wp11 Report Permit Pack 30 November, 2015 • Schlumberger 41110 Comments apply to Report the line before it. Company: ConocoPhillips(Alaska) Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: usft Latitude: From: Map Easting: usft Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° Well Rig:CD5-09 Well Position +N/-S 0.00 usft Northing: usft Latitude: +EI-W 0.00 usft Easting: usft Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.20 usft Wellbore Rig:CD5-09 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2015 11/21/2015 17.91 80.83 57,471 Design CD5-09wp11 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +N/-5 +E/-W Direction (usft) (usft) (usft) (0) 36.30 0.00 0.00 333.00 Survey Tool Program Date 11/30/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 36.30 550.00 CD5-09wp11 (Rig:CD5-09) INC Inclinometer(Totco/Teledrift) 550.00 1,550.00 CD5-09wp11 (Rig:CD5-09) MWD MWD-Standard 550.00 2,409.72 CD5-09wp11 (Rig:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 36.30 550.00 CD5-09wp11 (Rig:CD5-09) GYD-GC-SS Gyrodata gyro single shots 2,409.72 3,909.72 CD5-09wp11 (Rig:CD5-09) MWD MWD-Standard 2,409.72 13,207.07 CD5-09wp11 (Rig:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 13,207.07 14,707.07 CD5-09wp11 (Rig:CD5-09) MWD MWD-Standard 13,207.07 23,381.41 CD5-09wp11 (Rig:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (0) (0) (usft) (usft) (°/100usft) (0) (usft) 36.30 0.00 0.00 36.30 -34.20 0.00 0.00 0.00 100.00 0.00 0.00 100.00 29.50 0.00 0.00 0.42 110.00 0.00 0.00 110.00 39.50 0.00 0.00 1.61 20"x 42" 200.00 0.00 0.00 200.00 129.50 0.00 0.00 1.61 300.00 0.00 0.00 300.00 229.50 0.00 0.00 2.65 11/30/2015 9:16:38AM Page 2 COMPASS 5000.1 Build 74 0 Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (0) (0) (usft) (usft) (°/100usft) (0) (usft) 385.00 0.00 0.00 385.00 314.50 0.00 0.00 3.51 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 400.00 0.22 340.00 400.00 329.50 1.50 340.00 3.64 500.00 1.72 340.00 499.98 429.48 1.50 0.00 5.36 600.00 3.22 340.00 599.89 529.39 1.50 0.00 7.20 600.11 3.23 340.00 600.00 529.50 1.50 0.00 7.20 Start 2.5°/100'DLS,0°TF,for 719.7' 700.00 5.72 340.00 699.57 629.07 2.50 0.00 7.20 800.00 8.22 340.00 798.83 728.33 2.50 0.00 7.21 900.00 10.72 340.00 897.45 826.95 2.50 0.00 7.23 1,000.00 13.22 340.00 995.27 924.77 2.50 0.00 7.27 1,100.00 15.72 340.00 1,092.09 1,021.59 2.50 0.00 7.33 1,200.00 18.22 340.00 1,187.73 1,117.23 2.50 0.00 7.42 1,300.00 20.72 340.00 1,282.00 1,211.50 2.50 0.00 7.56 1,319.82 21.22 340.00 1,300.50 1,230.00 2.50 0.00 7.59 Hold for 107.27' 1,373.45 21.22 340.00 1,350.50 1,280.00 0.00 0.00 7.74 Base Permafrost 1,400.00 21.22 340.00 1,375.25 1,304.75 0.00 0.00 7.74 1,427.09 21.22 340.00 1,400.50 1,330.00 0.00 0.00 7.80 Start 3.87°/100'DLS,24.6°TF,for 716.91' 1,500.00 23.81 342.91 1,467.85 1,397.35 3.87 24.60 7.96 1,600.00 27.44 346.04 1,558.00 1,487.50 3.87 21.91 7.40 1,700.00 31.12 348.49 1,645.22 1,574.72 3.87 19.08 7.45 1,800.00 34.84 350.46 1,729.09 1,658.59 3.87 16.95 7.52 1,900.00 38.58 352.10 1,809.25 1,738.75 3.87 15.29 7.61 2,000.00 42.35 353.49 1,885.31 1,814.81 3.87 13.98 7.72 2,100.00 46.13 354.69 1,956.95 1,886.45 3.87 12.92 7.86 2,144.00 47.79 355.17 1,986.98 1,916.48 3.87 12.06 7.93 Hold for 265.72' 2,200.00 47.79 355.17 2,024.60 1,954.10 0.00 0.00 8.04 2,300.00 47.79 355.17 2,091.79 2,021.29 0.00 0.00 8.25 2,400.00 47.79 355.17 2,158.97 2,088.47 0.00 0.00 6.04 2,409.72 47.79 355.17 2,165.50 2,095.00 0.00 0.00 5.83 Adjust TF to 0°,for 20'-10-3/4"x 13-1/2" 2,429.72 47.79 355.17 2,178.94 2,108.44 0.00 0.00 5.86 Start 3.87°/100'DLS,11.7°TF,for 306.07' 2,500.00 50.46 355.88 2,224.92 2,154.42 3.87 11.70 6.02 2,600.00 54.26 356.81 2,285.99 2,215.49 3.87 11.23 6.44 2,669.92 56.92 357.41 2,325.50 2,255.00 3.87 10.67 7.08 C-30 2,700.00 58.06 357.65 2,341.67 2,271.17 3.87 10.33 7.08 2,735.79 59.43 357.94 2,360.23 2,289.73 3.87 10.20 7.35 Hold for 9319.2' 2,800.00 59.43 357.94 2,392.90 2,322.40 0.00 0.00 7.89 11/30/2015 9:16:38AM Page 3 COMPASS 5000.1 Build 74 III Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Weilbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (0) (usft) 2,900.00 59.43 357.94 2,443.76 2,373.26 0.00 0.00 8.82 3,000.00 59.43 357.94 2,494.62 2,424.12 0.00 0.00 9.84 3,100.00 59.43 357.94 2,545.49 2,474.99 0.00 0.00 10.91 3,200.00 59.43 357.94 2,596.35 2,525.85 0.00 0.00 12.03 3,300.00 59.43 357.94 2,647.22 2,576.72 0.00 0.00 13.18 3,400.00 59.43 357.94 2,698.08 2,627.58 0.00 0.00 14.36 3,500.00 59.43 357.94 2,748.95 2,678.45 0.00 0.00 15.56 3,600.00 59.43 357.94 2,799.81 2,729.31 0.00 0.00 16.77 3,700.00 59.43 357.94 2,850.68 2,780.18 0.00 0.00 17.99 3,800.00 59.43 357.94 2,901.54 2,831.04 0.00 0.00 19.22 3,900.00 59.43 357.94 2,952.41 2,881.91 0.00 0.00 20.46 4,000.00 59.43 357.94 3,003.27 2,932.77 0.00 0.00 10.00 4,100.00 59.43 357.94 3,054.14 2,983.64 0.00 0.00 10.41 4,200.00 59.43 357.94 3,105.00 3,034.50 0.00 0.00 10.84 4,300.00 59.43 357.94 3,155.87 3,085.37 0.00 0.00 11.27 4,400.00 59.43 357.94 3,206.73 3,136.23 0.00 0.00 11.70 4,500.00 59.43 357.94 3,257.59 3,187.09 0.00 0.00 12.15 4,600.00 59.43 357.94 3,308.46 3,237.96 0.00 0.00 12.59 4,700.00 59.43 357.94 3,359.32 3,288.82 0.00 0.00 13.04 4,800.00 59.43 357.94 3,410.19 3,339.69 0.00 0.00 13.50 4,900.00 59.43 357.94 3,461.05 3,390.55 0.00 0.00 13.96 5,000.00 59.43 357.94 3,511.92 3,441.42 0.00 0.00 14.42 5,100.00 59.43 357.94 3,562.78 3,492.28 0.00 0.00 14.88 5,200.00 59.43 357.94 3,613.65 3,543.15 0.00 0.00 15.35 5,300.00 59.43 357.94 3,664.51 3,594.01 0.00 0.00 15.82 5,400.00 59.43 357.94 3,715.38 3,644.88 0.00 0.00 16.29 5,459.22 59.43 357.94 3,745.50 3,675.00 0.00 0.00 16.76 K-3 5,500.00 59.43 357.94 3,766.24 3,695.74 0.00 0.00 16.76 5,600.00 59.43 357.94 3,817.11 3,746.61 0.00 0.00 17.24 5,700.00 59.43 357.94 3,867.97 3,797.47 0.00 0.00 17.71 5,800.00 59.43 357.94 3,918.84 3,848.34 0.00 0.00 18.19 5,813.10 59.43 357.94 3,925.50 3,855.00 0.00 0.00 18.67 K3 Basal 5,868.15 59.43 357.94 3,953.50 3,883.00 0.00 0.00 18.67 K-2 Qannik 5,900.00 59.43 357.94 3,969.70 3,899.20 0.00 0.00 18.67 5,970.38 59.43 357.94 4,005.50 3,935.00 0.00 0.00 19.15 K2 Basal 6,000.00 59.43 357.94 4,020.56 3,950.06 0.00 0.00 19.15 6,100.00 59.43 357.94 4,071.43 4,000.93 0.00 0.00 19.64 6,200.00 59.43 357.94 4,122.29 4,051.79 0.00 0.00 20.12 6,300.00 59.43 357.94 4,173.16 4,102.66 0.00 0.00 20.60 6,400.00 59.43 357.94 4,224.02 4,153.52 0.00 0.00 21.09 6,500.00 59.43 357.94 4,274.89 4,204.39 0.00 0.00 21.57 11/30/2015 9:16:38AM Page 4 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) ND NDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 6,560.18 59.43 357.94 4,305.50 4,235.00 0.00 0.00 22.06 Albian 97 6,600.00 59.43 357.94 4,325.75 4,255.25 0.00 0.00 22.06 6,700.00 59.43 357.94 4,376.62 4,306.12 0.00 0.00 22.55 6,800.00 59.43 357.94 4,427.48 4,356.98 0.00 0.00 23.04 6,900.00 59.43 357.94 4,478.35 4,407.85 0.00 0.00 23.53 7,000.00 59.43 357.94 4,529.21 4,458.71 0.00 0.00 24.02 7,100.00 59.43 357.94 4,580.08 4,509.58 0.00 0.00 24.51 7,200.00 59.43 357.94 4,630.94 4,560.44 0.00 0.00 25.00 7,300.00 59.43 357.94 4,681.81 4,611.31 0.00 0.00 25.49 7,400.00 59.43 357.94 4,732.67 4,662.17 0.00 0.00 25.98 7,500.00 59.43 357.94 4,783.53 4,713.03 0.00 0.00 26.48 7,600.00 59.43 357.94 4,834.40 4,763.90 0.00 0.00 26.97 7,700.00 59.43 357.94 4,885.26 4,814.76 0.00 0.00 27.46 7,800.00 59.43 357.94 4,936.13 4,865.63 0.00 0.00 27.96 7,900.00 59.43 357.94 4,986.99 4,916.49 0.00 0.00 28.45 8,000.00 59.43 357.94 5,037.86 4,967.36 0.00 0.00 28.95 8,100.00 59.43 357.94 5,088.72 5,018.22 0.00 0.00 29.44 8,200.00 59.43 357.94 5,139.59 5,069.09 0.00 0.00 29.94 8,300.00 59.43 357.94 5,190.45 5,119.95 0.00 0.00 30.43 8,400.00 59.43 357.94 5,241.32 5,170.82 0.00 0.00 30.93 8,500.00 59.43 357.94 5,292.18 5,221.68 0.00 0.00 31.43 8,600.00 59.43 357.94 5,343.05 5,272.55 0.00 0.00 31.92 8,693.29 59.43 357.94 5,390.50 5,320.00 0.00 0.00 32.42 Albian 96 8,700.00 59.43 357.94 5,393.91 5,323.41 0.00 0.00 32.42 8,800.00 59.43 357.94 5,444.78 5,374.28 0.00 0.00 32.92 8,900.00 59.43 357.94 5,495.64 5,425.14 0.00 0.00 33.41 9,000.00 59.43 357.94 5,546.50 5,476.00 0.00 0.00 33.91 9,100.00 59.43 357.94 5,597.37 5,526.87 0.00 0.00 34.41 9,200.00 59.43 357.94 5,648.23 5,577.73 0.00 0.00 34.91 9,300.00 59.43 357.94 5,699.10 5,628.60 0.00 0.00 35.41 9,309.76 59.43 357.94 5,704.06 5,633.56 0.00 0.00 35.90 CD5-09 BoundingPolygon 072715 BP 9,400.00 59.43 357.94 5,749.96 5,679.46 0.00 0.00 35.90 9,500.00 59.43 357.94 5,800.83 5,730.33 0.00 0.00 36.40 9,600.00 59.43 357.94 5,851.69 5,781.19 0.00 0.00 36.90 9,700.00 59.43 357.94 5,902.56 5,832.06 0.00 0.00 37.40 9,800.00 59.43 357.94 5,953.42 5,882.92 0.00 0.00 37.90 9,900.00 59.43 357.94 6,004.29 5,933.79 0.00 0.00 38.40 10,000.00 59.43 357.94 6,055.15 5,984.65 0.00 0.00 38.90 10,100.00 59.43 357.94 6,106.02 6,035.52 0.00 0.00 39.40 10,200.00 59.43 357.94 6,156.88 6,086.38 0.00 0.00 39.90 10,300.00 59.43 357.94 6,207.75 6,137.25 0.00 0.00 40.40 10,400.00 59.43 357.94 6,258.61 6,188.11 0.00 0.00 40.90 11/30/2015 9:16:38AM Page 5 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) ND TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 10,500.00 59.43 357.94 6,309.47 6,238.97 0.00 0.00 41.40 10,600.00 59.43 357.94 6,360.34 6,289.84 0.00 0.00 41.90 10,700.00 59.43 357.94 6,411.20 6,340.70 0.00 0.00 42.40 10,800.00 59.43 357.94 6,462.07 6,391.57 0.00 0.00 42.90 10,900.00 59.43 357.94 6,512.93 6,442.43 0.00 0.00 43.40 11,000.00 59.43 357.94 6,563.80 6,493.30 0.00 0.00 43.90 11,100.00 59.43 357.94 6,614.66 6,544.16 0.00 0.00 44.40 11,200.00 59.43 357.94 6,665.53 6,595.03 0.00 0.00 44.90 11,300.00 59.43 357.94 6,716.39 6,645.89 0.00 0.00 45.40 11,400.00 59.43 357.94 6,767.26 6,696.76 0.00 0.00 45.91 11,500.00 59.43 357.94 6,818.12 6,747.62 0.00 0.00 46.41 11,600.00 59.43 357.94 6,868.99 6,798.49 0.00 0.00 46.91 11,700.00 59.43 357.94 6,919.85 6,849.35 0.00 0.00 47.41 11,800.00 59.43 357.94 6,970.72 6,900.22 0.00 0.00 47.91 11,829.07 59.43 357.94 6,985.50 6,915.00 0.00 0.00 48.41 HRZ Top 11,900.00 59.43 357.94 7,021.58 6,951.08 0.00 0.00 48.41 12,000.00 59.43 357.94 7,072.44 7,001.94 0.00 0.00 48.91 12,054.98 59.43 357.94 7,100.41 7,029.91 0.00 0.00 49.19 Start 3.5°/100'DLS,-46.88°TF,for 1056.55' 12,100.00 60.51 356.62 7,122.94 7,052.44 3.50 -46.88 49.40 12,189.49 62.70 354.07 7,165.50 7,095.00 3.50 -46.22 49.77 HRZ Base/Top Kalubik 12,200.00 62.96 353.78 7,170.30 7,099.80 3.50 -45.01 49.77 12,256.82 64.38 352.22 7,195.50 7,125.00 3.50 -44.88 50.05 K-1/Lower Kalubik 12,300.00 65.47 351.07 7,213.80 7,143.30 3.50 -44.19 50.05 I 12,400.00 68.02 348.46 7,253.29 7,182.79 3.50 -43.69 50.25 12,481.80 70.14 346.40 7,282.50 7,212.00 3.50 -42.66 50.38 Kuparuk C 12,487.71 70.29 346.25 7,284.50 7,214.00 3.50 -41.93 50.38 LCU 12,500.00 70.61 345.95 7,288.61 7,218.11 3.50 -41.88 50.38 12,600.00 73.24 343.51 7,319.64 7,249.14 3.50 -41.78 50.45 12,700.00 75.89 341.14 7,346.25 7,275.75 3.50 -41.02 50.46 12,800.00 78.57 338.83 7,368.36 7,297.86 3.50 -40.39 50.41 12,837.69 79.58 337.97 7,375.50 7,305.00 3.50 -39.88 50.29 Alpine C/UJU 12,900.00 81.26 336.56 7,385.87 7,315.37 3.50 -39.72 50.29 13,000.00 83.97 334.32 7,398.72 7,328.22 3.50 -39.48 50.12 13,100.00 86.69 332.11 7,406.86 7,336.36 3.50 -39.19 49.88 13,111.54 87.00 331.86 7,407.50 7,337.00 3.50 -39.01 49.85 Hold for 95.54'-Alpine A-CD5-09 01.Heel 071615 JB 13,200.00 87.00 331.86 7,412.13 7,341.63 0.00 0.00 50.38 11/30/2015 9:16:38AM Page 6 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (0) (usft) (usft) (°/100usft) (°) (usft) 13,207.07 87.00 331.86 7,412.50 7,342.00 0.00 0.00 50.42 Adjust TF to 0°,for 20'-7-5/8"x 9-7/8"by 11" 13,227.07 87.00 331.86 7,413.55 7,343.05 0.00 0.00 50.56 Start 4°/100'DLS,0°TF,for 93.87' 13,300.00 89.92 331.86 7,415.51 7,345.01 4.00 0.00 51.06 13,320.94 90.75 331.86 7,415.39 7,344.89 4.00 0.00 51.21 Hold for 7049.52' 13,400.00 90.75 331.86 7,414.34 7,343.84 0.00 0.00 51.79 13,500.00 90.75 331.86 7,413.03 7,342.53 0.00 0.00 52.55 13,600.00 90.75 331.86 7,411.71 7,341.21 0.00 0.00 53.35 13,700.00 90.75 331.86 7,410.39 7,339.89 0.00 0.00 54.19 13,800.00 90.75 331.86 7,409.07 7,338.57 0.00 0.00 55.06 13,900.00 90.75 331.86 7,407.76 7,337.26 0.00 0.00 55.97 14,000.00 90.75 331.86 7,406.44 7,335.94 0.00 0.00 56.90 14,100.00 90.75 331.86 7,405.12 7,334.62 0.00 0.00 57.86 14,200.00 90.75 331.86 7,403.81 7,333.31 0.00 0.00 58.85 14,300.00 90.75 331.86 7,402.49 7,331.99 0.00 0.00 59.87 14,400.00 90.75 331.86 7,401.17 7,330.67 0.00 0.00 60.91 14,500.00 90.75 331.86 7,399.85 7,329.35 0.00 0.00 61.98 14,600.00 90.75 331.86 7,398.54 7,328.04 0.00 0.00 63.07 14,700.00 90.75 331.86 7,397.22 7,326.72 0.00 0.00 64.18 14,800.00 90.75 331.86 7,395.90 7,325.40 0.00 0.00 53.99 14,900.00 90.75 331.86 7,394.58 7,324.08 0.00 0.00 54.27 15,000.00 90.75 331.86 7,393.27 7,322.77 0.00 0.00 54.56 15,100.00 90.75 331.86 7,391.95 7,321.45 0.00 0.00 54.85 15,200.00 90.75 331.86 7,390.63 7,320.13 0.00 0.00 55.14 15,300.00 90.75 331.86 7,389.31 7,318.81 0.00 0.00 55.44 15,400.00 90.75 331.86 7,388.00 7,317.50 0.00 0.00 55.75 15,500.00 90.75 331.86 7,386.68 7,316.18 0.00 0.00 56.05 15,600.00 90.75 331.86 7,385.36 7,314.86 0.00 0.00 56.37 15,700.00 90.75 331.86 7,384.05 7,313.55 0.00 0.00 56.68 15,800.00 90.75 331.86 7,382.73 7,312.23 0.00 0.00 57.00 15,900.00 90.75 331.86 7,381.41 7,310.91 0.00 0.00 57.33 16,000.00 90.75 331.86 7,380.09 7,309.59 0.00 0.00 57.66 16,100.00 90.75 331.86 7,378.78 7,308.28 0.00 0.00 57.99 16,200.00 90.75 331.86 7,377.46 7,306.96 0.00 0.00 58.33 16,300.00 90.75 331.86 7,376.14 7,305.64 0.00 0.00 58.67 16,400.00 90.75 331.86 7,374.82 7,304.32 0.00 0.00 59.01 16,500.00 90.75 331.86 7,373.51 7,303.01 0.00 0.00 59.36 16,600.00 90.75 331.86 7,372.19 7,301.69 0.00 0.00 59.71 16,700.00 90.75 331.86 7,370.87 7,300.37 0.00 0.00 60.07 16,800.00 90.75 331.86 7,369.55 7,299.05 0.00 0.00 60.43 16,900.00 90.75 331.86 7,368.24 7,297.74 0.00 0.00 60.79 17,000.00 90.75 331.86 7,366.92 7,296.42 0.00 0.00 61.16 11/30/2015 9:16:38AM Page 7 COMPASS 5000.1 Build 74 • Schlumberger 0 Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 17,100.00 90.75 331.86 7,365.60 7,295.10 0.00 0.00 61.53 17,200.00 90.75 331.86 7,364.29 7,293.79 0.00 0.00 61.90 17,300.00 90.75 331.86 7,362.97 7,292.47 0.00 0.00 62.27 17,400.00 90.75 331.86 7,361.65 7,291.15 0.00 0.00 62.65 17,500.00 90.75 331.86 7,360.33 7,289.83 0.00 0.00 63.03 17,600.00 90.75 331.86 7,359.02 7,288.52 0.00 0.00 63.42 17,700.00 90.75 331.86 7,357.70 7,287.20 0.00 0.00 63.80 17,800.00 90.75 331.86 7,356.38 7,285.88 0.00 0.00 64.19 17,900.00 90.75 331.86 7,355.06 7,284.56 0.00 0.00 64.59 18,000.00 90.75 331.86 7,353.75 7,283.25 0.00 0.00 64.98 18,100.00 90.75 331.86 7,352.43 7,281.93 0.00 0.00 65.38 18,200.00 90.75 331.86 7,351.11 7,280.61 0.00 0.00 65.78 18,300.00 90.75 331.86 7,349.79 7,279.29 0.00 0.00 66.19 18,400.00 90.75 331.86 7,348.48 7,277.98 0.00 0.00 66.59 18,500.00 90.75 331.86 7,347.16 7,276.66 0.00 0.00 67.00 18,600.00 90.75 331.86 7,345.84 7,275.34 0.00 0.00 67.42 18,700.00 90.75 331.86 7,344.53 7,274.03 0.00 0.00 67.83 18,800.00 90.75 331.86 7,343.21 7,272.71 0.00 0.00 68.25 18,900.00 90.75 331.86 7,341.89 7,271.39 0.00 0.00 68.67 19,000.00 90.75 331.86 7,340.57 7,270.07 0.00 0.00 69.09 19,100.00 90.75 331.86 7,339.26 7,268.76 0.00 0.00 69.51 19,200.00 90.75 331.86 7,337.94 7,267.44 0.00 0.00 69.94 19,300.00 90.75 331.86 7,336.62 7,266.12 0.00 0.00 70.36 19,400.00 90.75 331.86 7,335.30 7,264.80 0.00 0.00 70.79 19,500.00 90.75 331.86 7,333.99 7,263.49 0.00 0.00 71.23 19,600.00 90.75 331.86 7,332.67 7,262.17 0.00 0.00 71.66 19,700.00 90.75 331.86 7,331.35 7,260.85 0.00 0.00 72.10 19,800.00 90.75 331.86 7,330.03 7,259.53 0.00 0.00 72.54 19,900.00 90.75 331.86 7,328.72 7,258.22 0.00 0.00 72.98 20,000.00 90.75 331.86 7,327.40 7,256.90 0.00 0.00 73.42 20,100.00 90.75 331.86 7,326.08 7,255.58 0.00 0.00 73.86 20,200.00 90.75 331.86 7,324.77 7,254.27 0.00 0.00 74.31 20,300.00 90.75 331.86 7,323.45 7,252.95 0.00 0.00 74.76 20,370.46 90.75 331.86 7,322.52 7,252.02 0.00 0.00 75.07 Start 0.07°/100'DLS,96.87°TF,for 3010.95'-CD5-09 02.Toe 071615 JB 20,400.00 90.75 331.88 7,322.13 7,251.63 0.07 96.87 75.20 20,500.00 90.74 331.95 7,320.83 7,250.33 0.07 96.87 75.56 20,600.00 90.74 332.02 7,319.53 7,249.03 0.07 96.87 75.92 20,700.00 90.73 332.08 7,318.26 7,247.76 0.07 96.87 76.29 20,800.00 90.72 332.15 7,317.00 7,246.50 0.07 96.87 76.66 20,900.00 90.71 332.22 7,315.75 7,245.25 0.07 96.87 77.03 21,000.00 90.70 332.29 7,314.52 7,244.02 0.07 96.87 77.41 21,100.00 90.69 332.36 7,313.30 7,242.80 0.07 96.87 77.78 21,200.00 90.69 332.43 7,312.10 7,241.60 0.07 96.87 78.16 21,300.00 90.68 332.50 7,310.91 7,240.41 0.07 96.88 78.55 11/30/2015 9:16:38AM Page 8 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (0) (°) (usft) (usft) (°/100usft) (0) (usft) 21,400.00 90.67 332.57 7,309.73 7,239.23 0.07 96.88 78.93 21,500.00 90.66 332.64 7,308.57 7,238.07 0.07 96.88 79.32 21,600.00 90.65 332.71 7,307.43 7,236.93 0.07 96.88 79.71 21,700.00 90.64 332.78 7,306.30 7,235.80 0.07 96.88 80.10 21,800.00 90.63 332.85 7,305.19 7,234.69 0.07 96.88 80.49 21,900.00 90.63 332.92 7,304.08 7,233.58 0.07 96.88 80.89 22,000.00 90.62 332.99 7,303.00 7,232.50 0.07 96.88 81.29 22,100.00 90.61 333.06 7,301.93 7,231.43 0.07 96.88 81.69 22,200.00 90.60 333.13 7,300.87 7,230.37 0.07 96.88 82.09 22,300.00 90.59 333.20 7,299.83 7,229.33 0.07 96.88 82.50 22,400.00 90.58 333.27 7,298.80 7,228.30 0.07 96.88 82.90 22,500.00 90.58 333.34 7,297.79 7,227.29 0.07 96.88 83.31 22,600.00 90.57 333.41 7,296.79 7,226.29 0.07 96.89 83.72 22,700.00 90.56 333.48 7,295.81 7,225.31 0.07 96.89 84.14 22,800.00 90.55 333.55 7,294.84 7,224.34 0.07 96.89 84.55 22,900.00 90.54 333.62 7,293.89 7,223.39 0.07 96.89 84.97 23,000.00 90.53 333.69 7,292.95 7,222.45 0.07 96.89 85.39 23,100.00 90.53 333.76 7,292.02 7,221.52 0.07 96.89 85.81 23,200.00 90.52 333.83 7,291.11 7,220.61 0.07 96.89 86.23 23,300.00 90.51 333.90 7,290.22 7,219.72 0.07 96.89 86.65 23,381.41 90.50 333.95 7,289.50 7,219.00 0.07 96.89 87.00 TD:23381.41'MD,7289.5'TVD-CD5-09 03.TD 112515 DK 11/30/2015 9:16:38AM Page 9 COMPASS 5000.1 Build 74 • Schlumberger S Report Company: ConocoPhillips(Alaska) Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (") ('.) 13,207.07 7,412.50 7-5/8"x 9-7/8"by 11" 7-5/8 11 23,381.41 7,289.50 4-1/2"x 6-1/2" 4-1/2 6-1/2 110.00 110.00 20"x 42" 20 42 2,409.72 2,165.50 10-3/4"x 13-1/2" 10-3/4 13-1/2 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (°) (0) 12,256.82 7,195.50 K-1 /Lower Kalubik 1,373.45 1,350.50 Base Permafrost 5,970.38 4,005.50 K2 Basal 8,693.29 5,390.50 Albian 96 12,189.49 7,165.50 HRZ Base/Top Kalubik 12,487.71 7,284.50 LCU 12,481.80 7,282.50 Kuparuk C 5,459.22 3,745.50 K-3 13,111.54 7,407.50 Alpine A 5,868.15 3,953.50 K-2 Qannik 2,669.92 2,325.50 C-30 11,829.07 6,985.50 HRZ Top 5,813.10 3,925.50 K3 Basal 6,560.18 4,305.50 Albian 97 12,837.69 7,375.50 Alpine C/UJU I Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 385.00 385.00 0.00 0.00 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 600.11 600.00 5.69 -2.07 Start 2.5°/100'DLS,0°TF,for 719.7' 1,319.82 1,300.50 148.29 -53.97 Hold for 107.27' 1,427.09 1,400.50 184.77 -67.25 Start 3.87°/100'DLS,24.6°TF,for 716.91' 2,144.00 1,986.98 578.99 -135.33 Hold for 265.72' 2,409.72 2,165.50 775.11 -151.91 Adjust TF to 0°,for 20' 2,429.72 2,178.94 789.87 -153.16 Start 3.87°/100'DLS, 11.7°TF,for 306.07' 2,735.79 2,360.23 1,035.37 -167.50 Hold for 9319.2' 12,054.98 7,100.41 9,053.77 -456.15 Start 3.5°/100'DLS,-46.88°TF,for 1056.55' 13,111.54 7,407.50 10,006.80 -730.96 Hold for 95.54' 13,207.07 7,412.50 10,090.92 -775.97 Adjust TF to 0°,for 20' 13,227.07 7,413.55 10,108.53 -785.39 Start 4°/100'DLS,0°TF,for 93.87' 13,320.94 7,415.39 10,191.27 -829.65 Hold for 7049.52' 20,370.46 7,322.52 16,406.72 -4,154.61 Start 0.07°/100'DLS,96.87°TF,for 3010.95' 23,381.41 7,289.50 19,086.88 -5,525.88 TD:23381.41'MD,7289.5'TVD Checked By: Approved By: Date: 11/30/2015 9:16:38AM Page 10 COMPASS 5000.1 Build 74 • • C 0 U) 0 U Q CO ) a U) MS £ Z c _ I y c O m ca • C o c 3 y oo Cam _ o o _ c o mon m Cl W o w U x O �� l6 O d • E IY cn O �/��/// t O -p O Zh U " + E Y C oN C13 L. O y w cn Q ami o w �/ tnV Tm v fl ^ E et m m 3 ii U v II NM a ti ■ Y/ V N n' y d 0_ v LO d' M 3 Q. ^ LL Q _� N Il. fn M N N Q 'O J O o A, Q 1: r U N YO lMf1 m m 0 V Z c 9 9 a t �0 L 0 y y 0 ■� a' m c t y (C'''' c C 4) < V U C w •I - > 7:3 c v � `.3 a s Q .. 0 >. c o x m m .2 c V / 0 N I.I.. 0 J > 41 — 7 c c y c c M I`- W o <n in CO > u> cn CF Q. S • co o Q I - c a a. c 0 U t; co` U �j Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Cl) _) C) N Cl) N N ))) Cl) Cl) C)) Cl) C) CA N Cl) Cl) Cl) Cl) Cl) Cl) Cl) C/) CA N CA CA C E E E a' E a' a' a' ilE E EE 'cKEEE EEEEEE EEE N l0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 888 Cl)cf) l6 N N (O N N N C6 f6 f6 (0 (0 (O Ta' N 'N Ti. CO (6 (O f6 (9 (0 N (6 '(6 CO'N Cel h a 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 cu 3 co CO O) Cl) Cl) Cl) CO Cl) Cl) Cl) Cl) Cl) Cl) Cl) Cl) C) Cl) Cl) CA Cl) Cl) Cl) Cl) Cl) CA Cl) N u) Cl) Cl) CA CO Cl) CO Cl) Cl) CA Cl) Cl) Cl) Cl) Cl) CA Cl) Cl) Cl) Cl) Cl) CA Cl) Cl) Cl) 0 Cl) CA C) CO CO CO CO CO CO CO CO CO CO CO CO CO 03 CO N CO CO CO N CO CO CO CO CO CO CO O. a a a a a a a 0_ 0_ a a a a a a a a a a a a a 0_ 0_ a a a :: 1 pi c O O. N E O O Q O O D O D O t O D O D O D O D O ' O a O D O o U C U C U C U C U C C) CO U C CJ C U O U Co U C U C U C CJ 10 E C CO C O CO CO C N C (O C f0 C (O C (6 C (0 C 16 C @ CO CO C (O C C m N a co LL N a CO CO a O CO LL CO LL Y a CO LL CO N (( CO = `C N O V) O rA N y d) CO O N O N OV ON O CO or ON O N O N 0 to co O co p C p co O co p co p co p co p co p co O co O co p co 0 U E OO26N (6 `l C`0 N (6 N C9 O C6 (U CO N O w °3 °-) °1 `1"° 2 2 2 E C co C co C co G co C co C co C co C co C co C co C co E' co C co C co 0 0 0 0 0 0 OO O) O O N CU O O a' O 0, O a, 0 0 0 0 O a, O 000000 0 -0050 (7) 000000 000000 000 O 0 (0 (0C1 (0 N O (O V N 10 N CO N (O C) 0 0) O N O) I) 00 V N M V CO M W M W CO O N W M COMOOMOLO O 10 N W M CO MNM C M 7 M N (O N 00 .- CO 0) O) .- 0) .- 0) 0).- ,- 1.0 A- (O O N- CO N N LO M 21-i M V (O V (O (M N M (O (Ni V 06 V M N M N C N V V CO O (O N dLL r r r r U a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ,1- 0 y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 000 3 t 011) L0000 (1) 0 )0 0 0 0 0 0 0 0 Cl) O (n 0 0 06 0'x) O (Ci CC) N N (n (O O N O N (O (f) O (O 0 0 0 N 0 N O O O (O 0 NON V/ 1114- N N (O N VCO N CO M CO - CO .- CO N CO V' (0 V CO M CO M (0 M CO M V10 p2 0 _ (0 (O (0 (O (O N C0 CO O (O O) U) 0) N N N (n N (n (0 (0 O) 00 W (O O M O V (O 'V' L0 N N (n N CO s- CO M O M O LO O) (O ,' N N CO O C O V N O (-6O) CO (O M V O V CO N N (O LC c0 O M (O CO (O in Q.`FO) MMWN (0 (O (O (O N (O N LO 0) N 0 O) OM ,I—V- N .- N W N a cn CO O O E -a N N o0 (O CO N ONONOM O (0 _ .- CO CO (O (0 O (n O O O (0 O N _ (O (O N 00 N M CO M O) - CO M 00 M CO (O 7 1t1 ,1- .- CO - N OMM C `1 a1 CO 7 (b ai 00 4 W V d1 O) O O) ci O d) 4 O V 0 O O O O V O) V O 0 c r V N N V M N O) N V ,l' 0) V O) 0) O) N O) N 0) O 0) LO O) N O) N 134 al N R to) N CO N V (n N (O M C0 .- (O - (O (O V (O V (O M LO M LO M (O M a O Q C o 6 rR rR (O 0) M c0 N ONMMOO 00 (010 (0 (C) CO M N M O .11- CON CL a- a E O 0) - - N. (0 (0 N N 00 0) W O O) 0.0 0) W C) .- 00 C0 0N. 0) (n a V O) N D) 0) W 0) M 0 O O M 0) ) O M 0) V N O) W 0) N O O 3 M�•+ - (N - - 0) 0 N (U N CO (O 40 00 (0 0 00000 .- N .-- N (O CO M V N Q C a O C.O.) CO _ E Q cm, W Q y V al x N N W O CO N O N O N O O O CO .- (O CO (0 (00 (000 0 (00 U (O (O N 00 N C0 (O M O) .- 00 M W M (0 - (n v CO v 1- (O N 0) M 0) i w O) (O4 (O O) ('O V 0) V O) O) 0) O O) O) OO OO 0 ) V O) V 0) ) O) 7 7 t a 3 Q= V N N V V O N W N V V O) V M O 0 N M N O) O 0) (O O) N 0) N 1 'tin y 3 N N (O N V CO N (O M CO .- (O .- (O .- (O V (O V (O M (O M (O M LO M N 0 E C is (a co c Uca n o � CO T Q) U t § t to aa 0 a u u) O) 7 O O O O O O OO rn LL L U a O CO IQ O a 0 C 1E Em .- .- NN N N W CO _ a s 0- 0. 0090 O O O O C H l0 fa CU ° a c- .- M M CO CO (n (n (!7 In «) Cn t1) t 0 0 0 0 0 0 0 0 0.O co U d 0 0 co C) cu?) (n V v (O (n M M U U U U U U U U '(f 3 > �i M M 0 M M M .- RR - - N N N N co' 00 M co M M V' (O CO (O Lr) U U 0 0 999 0 0990 R co 0 0 0 0 0 0 O O O O (() (() i (() (O (O (O i ,n ((7 «) (f) Cn ) (t) (f] h •- , -P. ...,� cc xa00 = E a 000000 0000 C C mmUvvu mm0000 0000 a° ° i0 (y Z N 000 (300 UUUU ' ' as as a. D N (O _ C1 CO CO M CO 4 V in in (O (O C C C C C C C C (O s U Y y �j M M M M V (O O O (O M CO M M M M M M M M (6 @ @ N 6 co CO 0 O r N 000000 0 0 0 0 a a a a d a d d N O O O N 666L4') 66 (n ([) «) (n 0 0 000000 0 0 ' ' . . . . ` •N Z O 0 0 0 0 0 0 000000 000000 0 0 0 0 0 0 0 0 0 0 O N C0 N O O '0. 0 0 0 0 0 0 0000 i i i i C I C i i i a N _ Lc) Lr) c o 0 7 E MM M M V (O (n (f) (O 0 0 0 0 0 0 0 0 co CO Q C`') C) M M V V (O 10 CO (Ocu C V C a Z Q In 000000 0 0 0 0 0') 0 M M M M M M M M U U U U 0 0 0 0 O 7. C CO m y E 66 Cn (t) Cn (n 66 Cf) Cn (n (r) Ln u.) (n Ln (n (n (n Ln C C C C C C G C Z U (1, fed' w 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0003W (a (O CO m Ci _ > m cc 'coo 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U o a a a d EEEE 01 • • Z o , 0) V] c CJ R r O Hk Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y /..., C Cl) N CO Cl) CO CO i: N CO i: N CO CO CO i: N i: N _N CO CO CO CO CO �i ` O O O O i:: i:: 0 0 0 0 i:: i:: 0 0 0 0 0 0 0 0 ca CO c6 N i: i:: (O (4 C6 N (0 f0 (O (9 C4 (0 (0 (O fa CO CO i: i: f6 CI 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 r3 CO CO CO CO CO N CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CA CO CO CO CO O CC) CO CO CO CO c6 CC) CO CO CO (O O CO CO CO Co a a a a a a a a a a a a a a a a d a d a C o l N E O O O O a) O O O O O O O O O O O O O O O o O 7 c O c O 0 0 0 0 0 0 0 0 0 0 0 0 O O O O U a) Ca CCOCOCCO CCOCOCO c O c O O mE co L.,.. a) u_ mu_ c0 u_ al mu_ al u_ CO u_ @a c0 u_ = 2` T/5000 E o a) y a) N a) N 0 N N N a) N a) N 0 O R. a ca c a ca c a c a ca c0 c a ca c U E `7 2 2 (Q a) O a) (O a) O O O N co a) co N O N E E c co c C c a c CO c (O c C c Cc C c c C0 Cl) O a) O 0 O O O a) O O O co O 0 O O O O O 0 0 0 0 0 000000 000000 0000 O 10N- 0 ,- 0O3- ,- 01 CO Ln 0 0 Ln N O 0 O nn Cv 'NI Lnn n n CNO O V M r— 'O n nM N o O —< OM 'O C v - V ,-- N CO CO LO n CO CO CO CO n CO CO 0) CO CO n NlL < c < U 'a o 0 0 oO O O O o O O O O O O O 0 0 0 0 o 0 0 0 0 0000 ,00 0 0 0 0 0 0 0 0 o O L LUOCLO Lri 0 0 0 0 0 LUCCCCUC0 o Lri 6 N Lf) Ln n n 0 Ln 0 LO O n 0 Ln o n n o In O N fl.N Ln CO M 'O CO CO Ln CO Ln CO CO CO Ln CO CO CO Ln CO CO CO OCC 0 7 E a a - CO Ln O) CO CO N O) O O CO N O W nWc. In n LLn NV W O b ON M VM W OM LnM VM b O n cc CO ' — V' M CO in CO M Ln In <} CO n n N < O) Cr) CO n 0- 0 N N ,- a-- N N _ w c� a 0 Cl) CO V. 0 E -a CO CO o O O CO Cr) n CO CO O N CO 0) O O) CO CO O V CO Z O L<) n) N CNb ; OO) M M V tOt L< (0OO c O — or'] O O <n O O • = .-5 N CO O n O Ln O in O n co Lr) O n O in O n N CT CO A O.N to CO CO Ln CO Ln Ln CO Ln CO CO Ln Ln CO CO Ln Ln CO CO CO a O y 0 7 < o• ' r R r CO a a0 Ed MoOV OM c‘,:: Onn NCn) CO n0Ln) C CO nOni CO cOLnoV NO(O CO <MOO OOCi) NV CO �CNOO OMnO < 7OC,^ 3 O N E co y •,--• < N N .- N N NN N N O 0 co• O Q C_ .0= 1 C 5 0 1.0 m 0 W 0 0 co x co CO O O O CO O n CO CO O N CO O O 0) CO CO 0 00 U O) n N N O M CO V r CO v v n Ln In — CO O L Ln O V CO Ln O O O O O Ln 00 O O Ln CO O O Ln M I t Ln 0 0 0 0 LU CSO CO Ln CO LO Ln CO LO CO CO Ln LO CO CO Ln Ln CO CO CO C) Z CI U E i C La o) c in Az n 0 N CI U z � .d o 7 0 Q 7 CO CO CO Cl) CO CO CO 0) �..� 0 L 0 m m (n m m m m 0-Ce • y rnrnOcac. _ onn_ Qc oo (p3Q3 L U 0 R 0 z% o 0 3 3 N L3 coo oho o ca a) g i OO oia 0 00 00 �+ m o Ln Ln Ln Ln Ln Ln Ln Ln Q Q 5 Q Q 5 Q Q 3 Q Q L V O N d a 0 0 0 U 0 U U U on 00 00 0 0 0 0 N N n n N N 9 N N N 111211 mm 'mm mm °a 3 0 O r N N 01' 9) < < 00 < < 00 Q Q 000 0 IXE ° � H 0 0 0 0 0 0 0 0 0 ¢ ¢ 0 0 D1 ,0 0 o ao Y. o N '") 7 co (300 (-•"-) (-) U U 9 m n n b Cb d 0 N Ln Z c c c c c c c c m 2 . . . to 0 0 CO CO d a CO CO CO CO CO CO < < CO CO < < CO CO < < CO CO O.Q m aaaaa. ( as . . . , mm . , Om , , mm N o O C �i ' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 •N Z a)0 Cn O o o N N 0) 6O) LLU L>9 COO CO CO ((0 >>n >n >n >n CO CO 49 CO 0) 0 .. O N L!) «7 Ln L() LU Ln Ln L() > > > > > > > > > > > > a v I:1 m = E 'E 0 0 0 0 0 0 00 < < < « « « « « < E V E , c(a z a >, c La (a y E c c c c c c c E E E E E E E E E E E E E Z �;,/ V m re IX o m m O m (a O O m m m 2 a) m m (Do ro E, E' 2 2 CD C 5ascc coo aaaa as aaaaaa 0_ 0_ 0_ 0_ ¢ ¢ aaaa CO 6 LL0 V CO < F Q' Cl) Cl) 0 ! z o Q Z I c.it 0 c O z N a 0 c0 0 C0 0 0 o Cl) Cl) u) U d Z ¢< n Q 0 LL U + 0 T T 00 ' 0000 0 53- ? 2X72222 <o 0 0 et- c a) a Q. o Z c o r co o T m Q m N N o _Q 1 '- LA N w 0 c ' -55 () o coI O co 0 0 0 0 0 15 d a) 0) Li) u-) 66Lc, 6L c 00000000 a� a� I0 0 0 0 0 0 0 0 c c 3 co L!� .in Q w a) 0 m c 0 00 00 N 00 N- 0 0 v 9 c o= 000L000000 — C E b/ 0 0 ' O 6) N f- M O C ��� .=.. r N M N O O N 0 2 M >,' ti CO N •iO- "O N Y Li ou (1) °'a. c c. 0 0 0 0 N N N- n y a) a) a = M00 () Nn 0 0 co N me .O L. N U NM coMNNUN N O oLU a V V (6 6 " _ NN O N N O U{ �.. ricO � m6 .CD 0 76 .4- LP C . ci cc;N CI) O E2- a N 2 O76U O C f0 U O N �tA N o @ ii id C c,_ N O L gLCD a ? . 3 m p E O OTD V 0 LL U C ` .O m O O N U O Z C N W f` C N m O C d o CCI N O co a _ oa5 W o cn 0 U Q • • ..., . -a z L 0 N C _ O I m to a U d C c cn C 3 C Nw C) U C 0. - C N Cu" O 2 w l0 CD CZ re as O t C a _O O a ' V/ Z U E o+ as iE • o L y 01 C N ASC L 0RS o , N w a • Lo 0 _,.% v0+ 0 2 El! L i = UC O a e CD 7 in 2 N W II = U• O o y d d CL 0 NSU = U Q ■v-+ Q X Q N M 3 O_ f- J O ,-' - N ° a M n i L r C .0 0 M N h Q •a J ' + U o v Q Z C O O Q MI 0 2 t c m O " o m m Q -0 Z 0)a) • � ,- j L0 L o o V O N CC Q 'to' 1,(� .. .. moi/ 0 U N -6 = co co U = F F W Q /y5 /�_/ Q j 0 0 E C C re C4 71) 'O C C 0 U ^' ^' U U 10030 f0 . M 1- w s o in u) 0 > in in • • Z a o CO Q Q. C � cv.1E-- 1 0 I� Y Y Y Y Y Y Y Y . .. Y Y Y Y Y Y Y . . Y Y Y Y Y Y .3C 0 0 U) _l) Cl) N CO CO al U) Cl) Cl) Cl) Cl) U) CO CO CO Cl) CO CO CO U) N CO CO COco U) In L �� O E 2 2 2 2 2 - ixE E E E R cc 2 2 2 a' E E E E E E S" .4.-..a O O O O_ O OC 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 O O 8 CA yam) 16 Ca Ca a) Ca (a N Ca (a CO co CO CO co co co m co CO co (0 co (6 @ co (a (6 CC � C 222222 222222 222222 222222 22 . N o U) N CO U) 0) CO I) CO CO U) CO CO U) CO CO CO U) CO CO CO CO CO CO CO Cl) CO O CO Cl) `� CO CO CO CO Cl) CO CO 0) CO co CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO Cl) CO CO z CO CO (a (a Ca Ca CO Ca CO Ca Ca CO Ca Ca Ca (a Ca N Ca CO Ca CO CO (0 Ca co CO CO C. CL CL Q CL O C CL EL LLLLaa a0_ LLLLLL aaa LLLLad r C 0 a v y E O 0 0 0 a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O o e, i�o o t o o t o t o o 0 t o s o C o o (� o t o f U m = c m c m c (a c (a c (a c m c Ca c (a c (a c m c (a c m c (a c (a O m E LL m LL m LL CO LL CO L.L. CO LL CO LL CO LL CO LL CO LL m LL LL m u_ CO LL L LC as aCO aCO a) COa) Oa) COaCO aCO a) CO a) CO OCO O COO O N OV O O ca E V 5 O .6 o E c b co p U a O D O o O 6 0 6 0 0 o p o p o V E m co m m m as o m a) m m m m ma) co a) co a) co a) co e co 2 2 2 m E c E cm c c c co c C- CO E' m E' C c m c c c c a3 3 a) a) a) a) a) a) a) m a) a) a) a) a) a) a) O a) m a) a) a) a) a) a) a) a) a) a) (o 0 0 0 0 0 6 000000 050505 000000 0600 O CO V 0) CO N CO N- 0) In V N Ln N LO r LO 6) 0 O) O I- CO In O 7 N- CO V CO CO M CO CO CO O N- COLU coCOCco co O In O in N co co In 6) N 6) C CO N CO V LO I- CO ,- In A .-CA CCO c -- 6) CO . In r- In O ,- LO N N- `O M la V In V M V In M h M In N 4 C) V M N M h ' ,� V V (O O Lo N ,- N ,-- 03 RI _ LL U a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v 0 0 y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 3= OCLUCOtri CLUCCCin OCCCLUC in 0 0 0 0 In O in O N n N LO ILO O r O N- In LO O LO O O O N O N o 0 0 LO O N- 0 I- O N N fl.N LO N N n CO N CO CO CO N- CO ,- CO N M V' CO 7 CO CO CO M CO M CO M CO O 3 V CU 00 (O CO CO N- 00 CO O Ln CA IC) 63 N- N N- LO n Ln CO co C) co Co CO O M CA M CO V In V Lo N n LO I- Lo ,- CO CO O CO O LO 0) CO V N- N CO 0) w .9 r O Ni O M CA CO in M V CO 7 (O N N: in Lr) W O (O In to to r- co Nu`V CO O) - 6) CO N- CO LO CO In h Lo N- CO 0) N- O CO O CA V V' N ,- N r- ( N a- a- .- a- 13 W a.� 73 U) CO CO r O E •p co CO N N CO N O N 0 I- O CO O CO a- LO CO LO CO O Ln O O O M O N N O N n N CO Ln ICO Ln M 6) c- 00 CC CO CO n V CO ,- LLO Nt. ,- Ln T- N- COO O) ) (O V W 6) in 6) LU V O) 4 6) O) 6) O) a1 O) 6 c} O) V O) O 6) O O) 7 O) 'R 6) O N'_ N V V N V CO N- CO N- d• V V 0 O) ) Cr)) O) COO) 03 O 6) LO 6) I- CO N- 0) m N G N IC) N N N LO N LO M CO ,- LO ,- Cr) ,- LO V In V LO CO LO M LO M () COCLO O C mp .-.. O a r R r R CO CO LO 6) N .- O N- CO 0) 0 0 O O CO CO CO M CO CO N CO CA V CO N- 0 E O — ,� CT s- co CO I- N c0 O) x- N- 00 O 6) 00 O) CO. O) c- CO CO O I- CO N 3 V�_ 6) O) O) N c0 O) CA M 6) O O M O M O) V N- N-- 0) oO C) N O 6) 0 o £ 0 w. - N 63 CO N- CO I- CO W CO CO 00 O) O .- N e- N In CO M V V V N c UO • cy� L1 c W ❑ Q O U K CO2 13 CO N N CO N O N O I,- O CC CO () v v O CO ,- LO CO LO CO O LO O O O CO O N N U 01 CO LO In N M CA CO IO M ,- CO CO CO ,- CIC) CO ,- COO) O) CO O r V W O) CO 6) c; V O) V 6) 6) CA O) O) O) O) V O) V' o6 6) O 41 V O) V 6) .c 'O p,' N V V N V 6) N 0) N V' V' 63 V CA O) O) N 0) N 0) O O) LO CO N- 0) N- CO 1 t" N r 0 = LO N- N N- V IO N CO CC CO ,- If) ,- Cl) ,- LO V CO VC) COILn CO LO CC LO M LO 0) z U E wpv 0 ca c t!) Cl w U zLO o 3 p a 5 0 N U ❑c $ /t � i a O O O O O 0 0 0 0 _ CO 00 CO 03 " E Z 0 0 0 0 I,- 0 CO CO a- � mdc°') as mm mm w- oat c m LL a LL a (L Q co co IO in Cn in in in In in Ln In c N — CO CO 0 0 0 0 0 0 0 0 O V U 0 0 CC CC n in v v in In M M U U U U U U U U N _ _ _ A �-.' C -0 M M 0 , M M M M 0 N N N- N- CO cO i.i co co co co co V 4 IO CO IO CO U U us us us 0 0 0 O O O O O O O N • E .a O a 0 0 0 0 0 0 0 0 0 0 0 0 , 0 0 0 0 C ' Ln In L. Ln L In c In o n/ •% Q M = E Ln In In (n A (n A (n A Ln U U U U U U 0 0 0 0 0 0 0 0 ♦- I.L R +' 0 0 0 0 0 0 0 0 0 0 , , m m m m U U U U U U U U ° c Z to 0 0 0 0 0 0 0 0 0 0 a s a s C 0. ❑ N IO _ N , , , , , , , , M M M M V V CO LO CO LO C C C C C C EQ to L V O 0 ; co co co co V 4 in in U) U) M M co co co co co co co co O 0 0 CO Co CO CO O p _O t+ O ) w 0 0 0 0 0 0 0 0 0 0 Ln to Ln a) Cn Ln Cn Cn a) LU LL d d d LL n- d LL N C C o IO `n Lo In In In In In `n `n 0 0 0 0 0 0 0 0 0 0 ,` CO Z a1 C = 0 0 0 0 0 0 000000 000000 O U o 0 0 0 0 0 CO COCU c �) d O .Q 0 0 0 0 0 0 0 0 0 0 , N _ O a p O cn E ' M M M V V CO LO O IO O D O D C p) = M 0 Q CO CO CO CO V 7 Ln Ln In In U U U U U U U U N U C '6 Z Q. 0 0 0 0 0 0 0 0 0 0 M M M M M M M M M M �O 3. C C co O E Ln Ln Ln In In In Ln Ln In Ln LC In In In In In IC) Ln Ln Ln C C C C C C C C Z y U d IX d' -' O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 Ca Ca Ca (a 000 Ca C > a) c c Co O 0 000000 000000 0 0 0 0 0 0 UUd O d O as d d M aI- ceenen 0 • CA nu Cj O 4 I c p �, E U U s. as 0 0 Y Y Y . Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y (\ U) U) U) U) U) U) N U) (/) N) U) 0) U) U) U) U) U) Z c W W N E .EE E E E EEE E E E E E E EEE E czt a =L 0 .. .f..' 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v) 0 m E S '0 7 0 'm'm 0 'm 'm'0 'm'm 0.0 0 '0 'm '0'm CC (4 a 2222 2222 n2 222222 2222 S (1) d U) N U) U) Cl) Cl) U) U) U) U) CO Ul N U) N N U) N U) N N U) `/ N U) U) U) U) U) N U) Cl) U) Cl) U) U) N U) U) U) N U) U) Cl) U) CLI m m m m CO CO CO CO CO CO m CO CO CO CO CO CO m m m CO aaaaaa aaaaaa aadaaa an. ad ig C 0 p•d d 0 0 a) O a) O N O 0) 0 a) 0 a) O 0) O N O 0) 0 0 0 p gi E O C,) C) U O UO U U U O V U U o U U r, U U U U U 03 a c m c (a c c4 c m c ca c m c ca c (a c m C m c co p m £ m u_ m LL CO LL m u_ m u_ m u_ CO u_ m u_ m m LL CO u_ = C U) cD 'in' a) N a) T. a.) N a) N Q) U) V) a) N a) U) V1 a) p ca• o cV o V E V p c p c p 2) p c p c p co p 2 p c V E a) m m m m m a) CO m m m m m CO a) m m CO a) CO m CO E c Cac m c mc m c m a. m c m c m c m c m c m O CU (1) O a) N (1) a) a) a) a) a) (1) a) a) a) a) m 0) a) a) a) a) U) 0 0 0 0 0 0 0 0 0 0 0 0 0000 U 0000 O O) CO O C`') (C) N- 0 M O) " V' 00 in 0 0 IC) N O O U CO 0) N- CO N CO LO CO N 1) CO0 ) 1- ..4" r r N0 O ,- CO V C (O. C N- • •- N- (n r CO (3) 7 CO ,- CO N CO N- O) — ,- O) CO (O V " ,— ' N CO O C!) r o c0 O) CO 1- (O c0 6) O M I- 0 -O0 0 0 0 0 0 O rn o o O o 0 0 0 0 0 0 0 0 0 0 y 0 0 0 0 0 0 coo 0 0 0 0 0 0 0 0 0 0000 O (ri (ri o o tri (ri 0 0 0 0 0 (ri 0 0 0 tri o 0 0 tri LC) N ..- 4 O r N (O (O I,- r O LO O (O O IN.- O (f) O N- O LOO I-- N ( Q N (O in (O co co V co (O (O co (O (O CO CO (O (O M co (O co M co N N C ©2 p . (O (0 (n O) 00 CO N O) 0 O CO N O 00 C ,.- N- CO U) I-- (O N CO CO CO O) CO V CO CO CO V' CO O (6 CO a) c0 O r N to O (O 'a Ln N (O N (n M (f) M Ln co (O M (O M O.l0 r .- ,- 'l M CO Cl) CO CO (O (O N CO r N N O) 63 CO N- W CL-3-"' N 73 O N COO E - O C) CO CO O O O CO 6) 1- CO CO O N CO O) O 6) CO CO O d' (h d ,- (b — r N N a- O CO CO Nr 7 .- CO V r' r--- (n (O e- CO C O O)O mi ( V coO O)( 0 0 0 0 (n 00 O O U) QO O O (O M a1 m - w,=, co N- N V CO O I-- 6) C() O (O O r O) Ln O r N.- N O) (O O 1CO N CO 12. N LO LC) IU CO CO (O CO (O (O CO (O CO M (O LO CO CO (O CO CO CO CD (L C i Q v o U .,— m r' 03 00 00 co M N O N CO N- n CO 7 N (C) CO O N CO CO CO N C. O) CO O CO ,•-• (O O) 00 01 ,- 61 ,- O V O) .- N- C O) ,- CO h O o • m o � O aU) - N v CO N 03 t) (O CO CO 6) 0 Q) 0N NN NNr CV CNC 0) OC) O CD 0 C in IlL CI Q d U RS O CI) CO CO O O) O CO O) CO CO o N CO O) O O) CO CO O oo U c4 O) 2 13 r co t` N N O CO CO M d CO v V (O (O r O ' (C) 6 4 CO (O 6) O O O O (O M O O (O a0 O6 (O M O 3 0..-.„ O r CV .4- N.- Cr) r CO O I ) (O O LO 0) LO O n 03 (O O N- N 1 t (A 0)) Cl) a) CO (O LO CO CO CO CO (C) (O CO (O (0 M (O (O (O CO (O LI) CO CO CO 0) z o E 2 O m al c II) 0 E N 0 al.21 1 U z � � ° C) O U) U) Cl) U) U) CO • (n0O U 0 m m m m m m /,./ acyl 6-0 C) O) O) o o I� N- CO CO O o 0 0, 0 0 0 0 {i �' £ 00 OO 00 3 3 3 LL L 0 v m m Z o o 3 c3 N C3) 33 L9 19 _ _ C9 C9 _ _ ado cam c 2 7 7770 rn6) 3300 33 ° ° 33 oo33 c N ° Lr) 0 0 Lc) 0 0 D Q a Q a ¢ Q Q 3 s Q a O u d y y 'n 0 0 0 0 0 0 0 0 0 0 (D0 (06 cn ur N- 0 Ui Ur D0 00 u) U) N3 3v m (� n � � m M M ca � � m "m C2. Z ca . . ooh ,- � -- rnrn rn Q a Q Q Q Q D0 00 0 Q1 E aco N m 1.2) D Q• a• 0 0 Ce xQ (y m 000000 00 .E E coo < < 1-; N.- < < (bmQQ O (° c. ( O N N C C C C C C C C = a V ? m CO m m CO m m CO a d < a U) m a Q ti Ui Q Q Cl) U) o p L ° M d n O O. 3 0 0 a s 1 1 1 m m 1 H m m 1 m m N .N ° C O N c • 0 0 0 0 000000 0 0 0 0 ,; C) C O O r `- N N 6) O) 9 9 9 9 9 CO I` r r r 9 00 00 jW a .O = m rn= m m 0 0 0 0 0 0 0 0 0 0 0 Q Q Q Q Q a Q Q Q a Q E V •- c v z C. E E E E E E E E E E E E E E o �, m m m m m m m m �) 0) `7 E 0 0 •u) 0 0_ O 0 O O Q IL d a. 4_ d d O O d CL O 0 0 d IL O (,) Q N 3 3 0 0 z ocz I 0 a - z et c r9, � c 0 0. Po 0 C.) 0 0 0 0 0 O (i) (!) u) U $ d ¢ (i) a a tUU U U + 0 T T 00 A 0000 ? 2202222 co 0 0 v c a) R O) a a T d c c v) O CL al 0. a) a) d 1 = in N w 0 C) o li I 0 0 0 0 0 0 0 0 o 4. p 0) to to to to to to to to - c 0 U U U U U U c 3 Z Q 11 3 U V O O N O N n cN 1) E 0 0 I-- O r O o v 9 0 O 0 0 p) O 0) N: N -a c E O$ to 11) 0 11) 0 0 O CO 4= U - F U) to 11) V 11) 0) N I- CO c c � N M � � N O O c0 02 O y L• E Z `2 p p zr m o D c c {O O O O O N N t` co 0 N IL 0 CO 0 0 CO I- r O O O O CD -C t O £.1F'' C.O. t1) t1) M 0 cri 0 0 0 U co Ii 3 i!..3 O p O O co LU t1) V V N CV ( 7 3 7 LL N N CO CO -O y 4 N p _U O) O O C = m c4 O 1.• _O y U N r O N Z5 O. 'p 8 2 0 0 f6 C N t0 o C c 0 d O •N y 0 rn p II m N p c O. w p -0 .Q 412 3 m 0 E O O N a m LL' U 0 N c O V 4) p .2 p c O Z 4.1 p N N c O i0 O p_ 0 cC CO CCI 0 M Q - 6 0 N p - E 0cno5a • 9:48. November 30 2(15 CLad er View D5-09wp11 The Reference Well is along the X-axis. rror Ellipses are the Sum of the Reference and Offset Well Errors nm V3 3 3 Failed Anti-Collision no ® o OU 4D U 300 I € II 'M II111i1 ed m I Ii11 11111 . i o tlp w�( I "'I II hi GumL �d� 1 11 n. ���IfP' I ' ' i cn rEIlJ 2 ,re61 ,I{ 11 11 c 150 �R@9. .l ii I II �� 1�,�Itll 0 Nail11 "II i itlifird, di @r' _..... _ _ 1 11011,,'J11@18 Elio it III99 i I 11iii l, i 0 _ Equivelant Magnetic Distance I I 1 I I I I 1 I I I I I I I 1 1 I I I I I 1 I U 3000 6000 9000 12000 15000 18000 21000 Displayed interval could be less than entire well:Measured Depth 36.30 To 23381.41 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 550.00 CD5-09wp11 (Rig: CD5-09) INC 110.00 110.00 20"x 42" 550.00 1550.00 CD5-09wp11 (Rig: CD5-09) MWD 2165.55409.72 10-3/4"x 13-1/2" 550.00 2409.72 CD5-09wp11 (Rig: CD5-09) MWD+IFR-AK-CAZ-SC 741213120/M5/8"x 9-7/8" by 11" 36.30 550.00 CD5-09wp11 (Rig: CD5-09) GYD-GC-SS 72892881.41 4-1/2"x 6-1/2" 2409.72 3909.72 CD5-09wp11 (Rig: CD5-09) MWD 2409.7213207.07 CD5-09wp11 (Rig: CD5-09) MWD+IFR-AK-CAZ-SC 13207.0714707.07 CD5-09wp11 (Rig: CD5-09) MWD 13207 0723381 41 CD5-09wo11 (Ria. CD5-09' MWD+IFR-AK-CA7-SC LI00 c 0a 3 0 3 3 220 22 .. U .. 60— - .--1------- i1 •I I c Q i ' -La 30 U C o 0 1 I I I 1 I I I I I I I I 1 1 I I I I 1 I I I I I I I I I I i I I 1 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth Equivelant Magnetic Distance • 10:05, November 30 2015 CLad er View D5-09w 11 The Reference Well is along the X-axis. rror Ellipses are the Sum of the Reference and Offset Well Errors g gg 3 3 Minor Risked MA A O 00 ® O OU 6D U 300 V' Iii H,Nm , _ 1 j I 1�11gN�' L: wo"qv �, `° ��Ip�nitllli�` I� lil)11 II 1 1 m `iF 4 1 UIQ 1�, � 150 NV' �II a1 � _� 11, ,if, 0,�1 0 1,I III r0 i o Egurvelant Magnetic Distance I I I I I I I I I I I I I I I I I I I I I I f o 3000 60100 9000 12000 15000 18000 21000 Displayed interval could be less than entire well:Measured Depth 36.30 To 23381.41 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 550.00 CD5-09wp11 (Rig: CD5-09) INC 110.00 110.00 20"x 42" 550.00 1550.00 CD5-09wp11 (Rig: CD5-09) MWD 2165.5409.72 10-3/4"x 13-1/2" 550.00 2409.72 CD5-09wp11 (Rig: CD5-09) MWD+IFR-AK-CAZ-SC 7412133207AB/8"x 9-7/8" by 11" 36.30 550.00 CD5-09wp11 (Rig: CD5-09) GYD-GC-SS 72892E1381.41 4-1/2"x 6-1/2" 2409.72 3909.72 CD5-09wp11 (Rig: CD5-09) MWD 2409.7213207.07 CD5-09wp11 (Rig: CD5-09) MWD+IFR-AK-CAZ-SC 13207.0714707.07 CD5-09wp11 (Rig: CD5-09) MWD 13207 0723381 41 CD5-09wo11 (Rio CD5-091 MWD+IFR-AK-CA7-SC 31 I n0 3 3 3 3 0 0 0 0 0 U U U U U so-- '141101=sl/11" 111►1tir 1 -►Ir oligN�\%11/11/11 I Spco )l1(,r / 1 FA i 30 1117111:41111 I1II®'�'�� II NM - ° 01, iriiiiiiiwiAll A Aggikkti. tlihs; 0 0 s, 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth Equivelant Magnetic Distance C1135-O9wp11 Inc Azi TVD D1eg TFace get 385 570 36.30 0.00 0.00 36.30 0.00 0.00 36.30 To 23381.41 385.00 0.00 0.00 385.00 0.00 0.00 570 760 600.11 3.23 340.00 600.00 1.50 340.00 1319.82 21.22 340.00 1300.50 2.50 0.00 760 950 9:51,November 30 2015 1427.09 21.22 340.00 1400.50 0.00 0.00 950 --- 1140 2144.00 47.79 355.17 1986.98 3.87 24.60 CASING DETAILS 2409.72 47.79 355.17 2165.50 0.00 0.00 1140 1330 2429.72 47.79 355.17 2178.94 0.00 0.00 1330 1510 TVD MD Name 2735.79 59.43 357.94 2360.23 3.87 11.70 uo.00 110.00 20" x /2" 12054.98 59.93 357.94 7100.41 0.00 0.00 2165.50 2409.72 "0x39- 8 1by111" 13111.54 87.00 331.86 7407.50 3.50 -46.88 CD5-09 01.Heel 071615 GE 1510 1700 7412.50 13207.07-5/8" x 9-7/8" by 11" 7289.50 23381.41 9-1/2" x 6-1/2" 13207.07 87.00 331.86 7412.50 0.00 0.00 1700 2600 13227.07 87.00 331.86 7413.55 0.00 0.00 13320.94 90.75 331.86 7415.39 4.00 0.00 2600 3500 20370.46 90.75 331.86 7322.52 0.00 0.00 CD5-09 02.Toe 071615 JE36 30 550 00 3500 4400 550 00 1550 00 5-o9,11 ;a; m-091 INC 23381.91 90.50 333.95 7289.50 0.07 96.87 CD5-09 03. TD 112515 DK 550 00 2409 72 C85-09,311 CR, CD5-09) NNO4I88 Alt CAN SC 36 30 550 00 2409 72 3909 72 -09,11 ,gig m-00; -30 4400 - 5300 2409 72 13207 071470;0, m;-0..p.. ,Ri.:at, m .983 13207 07C95-04) 141304I303 AO CA2 SC 233.3.. 003-03.,33 ,.s,:ms-0.3 981114I88-9113-C93-3C 5300 6200 6200 -. 7100 ..,....,.; .,. : ,...... .>, 7100 8000 8000 8900 Failed Anti-Collision 8900 10710 0/360 10710 12520 12520 14330 -30/330 210 30 14330 16140 16140 17950 195 17950 19760 180 19760 21570 165 21570 23381 11111 -60/300 60 CD5-02wp08 10 « -_ 90 „, pD5-01wp0 CD5-12wp07 . '.-.{;„.-7„---_1.--.:::.-_..-_--..„......,u, t: ��,������`0`�'-% =E- `e iiiiliill�0 4 2 CD5-03 p\1i`�,��is r;i/%%?- �a /0$2 h 4Aa,A iii'% ��,�kitlit+t;lIV/flit',1 ii ii i it,/4,. s : --= . ` '�4ii. = '.CDS-03wp11 90/270 , . 11,1 {r f > • �ll, �,.v� v • �n `� i "� �, Pyy�,,�.�� �1 , _-s P�� .♦ it /.��� �JI�.I ,l1�! pt: t e e y.�'AW-8Dwp01 Bi• •,,,A.?' was,' avra,.< '► -?,:ill:..".,® r s� le / 1 rs � �.- . ;t . -fa r i/i • i1 �� �• -,---4-0.1004.4.-:, " - CD5-05 "m --,,,..„4„....,„#:".„i2„.!.:: ! i% . �iii - 7, H� r4/ 5 .a:vb - .. i ` ssg .� l ♦ 04�1i da ,4w .' �A,�! : 0-K' : � 4. , .,„,•„„...4,,..... ...4.. rte, Ii .l ..r f .f/ .�♦ /ui jrI/��iY t4Ms dIAi a",:rjC01 0'W-$DW 01 .: r'7� in�' r . ... f riw®,i. -4, . - li7i® .:4, /a\\ ol. � oi4: Q5- 5wp! ettir, i40 , .i.i,'.+ ' r ria �deo rTmtipP sc r. i . o� tIa w • pe , , , '..•''.'"':'7: . . 4 �t►1Qi. ' l�04 �®I4F Lam! i e a�14 fr/ri. SI/%,,T 1'i \,L,._. t�''4.44.,..,4005476:14:?, ,i, � r r CD5-99wp08 AW-7Dwp01 '; a.;,�%�•':_•4.:04, i4►�.<. ='`�7�/`-..a •r'30 ' O.1e•%:; %;,, ..s �: °�® -120-(240 >�••"4:7.:-rJ1631�1�'!�� 'r-�-U4.7.04 a .. ,/4J''�� <�"4;r,�^k-Vdv►.���^w� *�:,,,,App,-, 120 ��.♦. -��r� i�♦��O Lam' I{ I i o i♦r si.,_t'��i`/ ,Ii,p�1: 1"�♦�i�•A w�I� a11�1 e^��`�jhl-�\ ..O ,/� �_ q�/�•�X� �iN'.�0 s /� �....ti►� l►!L L.• A. ..■®01' „ ., .' .1CD5-04 . �i 1 �moi' ������ �� s�\� � a•4� � AW-6Dwp01__ ifi, 1tr►iia •� �, ,_��` �0....0r Ar. l0..� "::_,ir , _ •,i►��1,'►r��.`.1'.+._.�I1�;/� v r®,,�.�'re+gr�;4s ,-4 �- CD5-07w 09 s... an064 00 i��is�44180 ,•,`�lv`"`2rA� , ;:-�('. . P AW-5Dwp01 A.�•0 - A011k•4i{*►.11.44 t;95 `- A'0'•"; � i -- �,►.� � _! �-�F .0 \,r'� .. CD5-08wp09 -150/210 _i'14ViV a\ -�, ` ����� i 150 ���'°i�',Z,;l •,► c CD5-11w 10 CD5-315PB1 p CD5-315 -180/180 CD5-314 CD5-10wp09 CD5-313 CD5-313PB1 CD5-09wp11 Inc Azi TVD Dleg TFace get 385 570 36.30 0.00 0.00 36.30 0.00 0.00 38.30 To 23381.41 385.00 0.00 0.00 385.00 0.00 0.00 570 760 600.11 3.23 340.00 600.00 1.50 340.00 760 950 1319.82 21.22 340.00 1300.50 2.50 0.00 9:57,November 30 2015 1427.09 21.22 340.00 1400.50 0.00 0.00 950 1140 2144.00 47.79 355.17 1986.98 3.87 24.60 CASING DETAILS 2409.72 47.79 355.17 2165.50 0.00 0.00 1140 1330 2429.72 47.79 355.17 2178.94 0.00 0.00 TVD MD Name 2735.79 59.43 357.94 2360.23 3.87 11.70 1330 1510 110.00 110.00 20" x 42" 12054.98 59.43 357.94 7100.41 0.00 0.00 2165.50 2409.72 10-3/4" x 13-1/2" 13111.54 87.00 331.86 7407.50 3.50 -46.88 CD5-09 01.Heel 071615 JB 1510 1700 7412.50 13207.07-5/8" x 9-7/8" by 11" 7289.50 23381.41 4-1/2" x 6-1/2" 13207.07 87.00 331.86 7412.50 0.00 0.00 1700 2600 13227.07 87.00 331.86 7413.55 0.00 0.00 06226«66 13320.94 90.75 331.86 7415.39 4.00 0.00 2600 3500 0:3oss"rvo5i�16v4:m-051Tool 20370.46 90.75 331.86 7322.52 0.00 0.00 CD5-09 02.Toe 071615 JB 3500 4400 0 s5o:oo m5-o5,n c64:m5-091 23381.41 90.50 333.95 7289.50 0.07 96.87 CD5-09 03. TD 112515 DK 550:00 : 5-09,111614:m-091 -3C 34.30 5-59,31 1u4:Co-097 -99 4400 5300 2105.73 3 -05,11 1614:..-09) 2109.72 1310'97:07 CD-05,31 (614:6:65709)- -A6-CAE-SC 13207 07=4707.07 C°3-09,13 1614:C0 097 11113 5300 6200 13207 07 23301.1 C°5-05,11 (614:003-09) 1,6113.IS6-AS-CAE-SC 6200 7100 7100 """"- 8000 8000 """ 8900 Minor Risked 8900 10710 0/360 10710 12520 -- 12520 14330 -30/330 210 30 14330 16140 16140 17950 195 17950 19760 180 19760 21570 165 21570 23381 i -60/300 60 1011% � �%" CD5-02wp08 111111%11%11r;, :}\'u , CD5-01wp08 CD5-12wp07 0 o • -}- 3` _- •�� ��J�4,-,---:.--:.-...-_-1..-:--,--:-.1k,--,,,-..---,3,-_7,11.1i10Pl CD5-03 \ �,� i,t E F� ti 1i44 E '�, 2 J}}��, F 'x: . �V\```��iP�°0,�%0/!/10itti / 1,• ' -, 114 PkiiiiiR►' , z 7'':�;, CD5-03wp11 -90/270 T-1 "' �\ 1 �'4-,,''''''''''...,-,-,7,'.:1,-".4,,;,,' y���/t/ .5 rn a i► '90 1 1 � ��11. % ��lirfr ,� 4,� � n��A�S r , ' \ ' j)._„,/41"..„_..m.:7.:ALW-1!......::,..- „,,.....r..* , _ ,...,,,,_..:":" .,,f,..„:_....":::,...-.7.?,,ti:c..":;14, �, - - '` ,, .�s e� t� e 'e47;05. I��'►'• .�,:• 0,1,00:41,1‘,,,..4, CD5-05 a "� 0� . i I is . it - S� �'.i. till - ''J1�` -,7 �/4i I 1 .r. s ♦ r✓! ° s r �%4 i js/4'''' I ®// Iii .4 /®Y v4rwit -'kj. 5 0 CQ5-05wp10 W-8Dw 01 it .rAI®�0 r , \�q �i a �' ►''�o\\-v Artita4° p 1, 11..L . ;tz-LA Ai. ®jo rr;' 1 G�. I��I '.47 i�® �`.raie► 15 4, s - .. . .,. .L.: ,fie '',: .1., .../ a ., 7���.l"R-'Is >1�♦.-•�'j.•�'`4Z®r '� �►JS r�I.�/� !r � r r f ter` �c�l®.!� � i' 44r:1".1-.f, y.z �)'ft rr .,�.7®/®`, H/ i/ \� 4:y i jai slaw/ " O i. ��♦ r or.w/`'. .•j.--:;400,71---„'::',� 1/��1I 1/��e/r/moi , s '0=ft tr 7,4%° .114441:�i iirAl ♦f ► r �I‘♦d!;r' Jfe �`` CD5-99w OB w-7L v 01 p .;';.4;,.fig►.i.Y, 0 �,t1�y+�i�'.��., �h���:l�If�g�% j r/ . 1�/�;i��,�..5�',��®: -120[240 �, ►1� .r► f J,i. r- 14` •.-' ttA 4 i.! t . �/j..,/ 120 �, • ®"� ::w� ,o,: ,oi . .> .OAF,`OWEN i1 d s%,-. I ,mo i V._,....37,,,,-;...„ . ..0,111111.,1"., ....1 14w�.o 17 'O• ` .ib /, 41 rrs�L►�.z.),, e` i'' &/��J���ya�i0/o��ai�,.® sh rle4- 'm\94'm.r _CD5-04 ♦�i� 111 i�, \�e�1��";i� � �`!\���r•r''�.af� ��.a y'J..,, � AW-6Dwp01__ \17, -r.r a®D�6 `1;4. I._�N� wa-`.--� ®� `•�.,I i .�0,►.,►*1.iy..LIV:i.! �', '165 '.;7/t.-i•60 vgaNt ��` , r a`� CD5-07W 09 1 `i,e� 41004 01 �-1.�►' i; Mfr ti fi G �.I•14 4. p tr 180 _I��,.r�Ig4.v�bl•� dA., r3 * i a;Ji AW-5Dwp01 ,�e���4i ►}��./i��'��'®o:®®�%95 �,►°"•� X9441 ---- �'' ®� ' y�- _ CD5-08wp09 4J•S♦ `ii Ei`„ t J 150 -150/210 .irp+7���!.��'j� ice® ,'` 0 , CD5-315PB1 `i CD5-11wp10 CD5-315 - -180/180 CD5-314 CD5-10wp09 CD5-313 CD5-313PB1 V 74 Northing (5500 usftlin) 11111111 1 i 1 i 1 i 1 1 1 1 1 1 1 . 1 1 1 1 1 . 1 . . . . 1 1 1 1 1 1 . Ill 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 - < = C - - 0 t6 - - (N — 0 V. O 0 -- - 0U — C - - a ` Q - - - a) - Cl. - o u _ Sin _ O It'n - 03 C. N — 3o Q in — o in cy, Q - Q a - 00 o — W' 3 Q - O - U M co O i Ch — U U - O - _ O X17 r ID o O d coto c _SI - N a •oNil r O - C L. If/ C o O \ j - O h. - 1 — 0. 0 I — 3 - in - - O O - - U 0 — - - - - - - — — - — LO - r - - - - r�l ; "i _ '".Z 0 — - ,o . � - - - - " tt3 N —t — — 0 , z ii1iiiiIiif iIiiii1iiiiI iiiiiiiiiIiiiiIiiiiiii1iiii1iiiiIiiiipili1 N M (uift;sn 0055) Bui4poN O V. AC Flipbook 0 0 O O o o 0 0 0 0 0 0 0 0 00 • • p O p O O O O ' N M Lfl `O Lf� p O O M 000 O 000 N. Is\ M ON N. Lr\ M M LI\ O1 NM- r r M cr LP\ \O N. 00 00 0 eN-- r- Ql N rrNN i 1 L! 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M 00 N. 'O L/1 M `' 0 0 0 0 0 0 0 0 0 — N rn d Ln N. M Lf\ N. Cl M N. qO 1.n d- rnN r 0 O� N. V1 rr1 N- O' N. L I N M d- [-r) '.O N. 00 00 O� NN N O O O 01 x � Q' 0 � �.qq , � ,n. ' .allr1. ad ''''07141411/1/0/0"4 ‘ � �� /7141 ���1� �1 �SzoSgo3o3 � rnul/% �� o% AII. <,,,,,,,,.::414,1": ,,,,,t,g ,, ..fiv1/4 li 1111 : IL-J z, ,.-',.,.,z.::-_-1...it:,:r.1-;-.4-Ate:, . -ilk -,Nt 0, \ , .-, ...,, ,,,,,..„...,,_____.:,.....z...17- le 4. lb,. 11111; ''' 9PP It 11/4% 40C4,11014g11/701� �� � Orr ,, igIvl00 4r, 0 __.40.0144ivirooz 0,k1 006, -',:z4r44411ktittYvv"' 1 133333333r000.00.0 \ lirr/r NIti',,,al i�!' I,t." 'VA.. i i Q ,. r 1/1 3,0000066 -,-e.-%,4,1W#, 104,\,i./.10� iir vi V V V V V V V V �y �j \.. f .00.-4 1116,P /;•11,.1®.ice �, r e . r _ r _4444•01,10-'4"--- �.=� �, O Ef? _ kat --......"0,10,..4 ... ii g -- rr\ --41,..m.t--4:4‘. .m41 , . •- .,--44.0...zre::4740.1". ...-- 0 _____ iffip,..,isroir004 .4ivA- 0 friii,,,irsrAffolitlw.,IN;44,,,k,,,..to_fra it _,,....,...1....4.4.......01 . 1114.11,A 00 14/10.4$63 Atiallikilklc . VII t> 0 1 al Zo t111061_ ,. 4411,\ ri ,/d4 P A //Owl"' ** ‘,,Vt'Z'k 1,4 i---4.KariOrW/ I SAW \ '911/4444\\ 6• --'';'*7111741/* • t . . r,! 0 UN[ -v:. ': apt.fillir���\ �, Itlit i;` � ' pf,7 Ln L,si1/i %,nl1am W rI ® % ' vl111,, '' ' A7t� i2}; riQO � , fp - e. �— 0 o Ln O rn 0 NLH L11 O. _ "---- D,.. O 0 N. O in o 0. O ,_ N rn O L. Q o 0 0 0 o N. N. 'o qa v, E O 0 . N. d0 0 0 0 0 7 7 7 a' rn CO CO 00 00 CO a\ cu L A �' o o d- d- d- m rn rn Ln in ren m m m n fr\ Z Q O M M M M M M M M M M M V M 0 0 0 N a 0 N N aCO N. N 7 M • rn 0 7 00 0 p N. n a1 Lf-) 0 O a1 dO - • • • • • • qp • Lf' 0 a1 N d- a1 al L r) q- N. N. 0 0 '- M M CO 0 N d- 0 N M in 0 N N N M P r N N N N N NN M rNrl M M ,Mn , e- r 0 N N 0 0 0 O p O 0 0 0 0 O O O 00 0 rr\d 'Nn 00 co N 'O Lr\ d' rn O 'o � d' rrf' NN O 0 O' N rr\ r- O� r--. rnrrn Lr,\ t\ a , N M d" L(( LO N CO CO o - - N N 1 .O L(, 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m 00 N. L() d' r'rl 0 0 0 0 0 0 0 0 0 N rrn n d' r N., L(1 N 0, ' M n <) L , d- rr, N 0 0 Lr\ r- e- e- ,- N rn d- Lf\ 00 00 O� N- d1' d> N 0 CiN 'ki\ \, - ____,,,, 0\ " aL, f,. ,,,,,,v,...„,.....„4„,., � � �fi ‘_ N a � ,,, 0, ^ L. --�� ..--:.41/4411- CO 0ea0000000 -,3,--..---3,--J-,-,;,-,;,--;,--3: ,_ 41 ,1 z 00000000 mmmmm1A‘‘**k*k CI � k� iii.w01 LThhLhiLO vi V V U V V V V U 122 V..`-!, "?'r,'';';: 41011111111IN 40011111111110 tAint 1"111 1114111M1‘ o oMs!s goo o p p O E rn (1( 0O o O 00 x o CL* a. ,--, /// tlikilior rffAlW U Q o \/;;31finly \/(it r il \ \\*\\\\\-1 I 1-11111111ININ, e Iv....0 LAI rtarr re) ; p ( \t \'‘k•sillPilli‘i' \ inN.- 0 o N O C N N m LJO ° ON 0 • 0 0 0 0 0 N. N. N. d- d- LO ` ‹0 k.0 , k.0 E O F- < o o 0 0 0 7r 7 rn rn o0 00 '00 00 co a: > LA 0 O O d' d' d' crl M rr1 Ln Ln rn r n rn cn r n rry Z 0 0 rn M rn rr rr1 M rn rn rn rn rn • 0 0 ' N a1 O N N 00 d- N. N. d' M U 0 rn0 . 00 0 0 n r N. C Lr\ 0 0 a\ d- d- 0 in 0 •01 Nr d- O' a L/1 d- -• n• n o p ` , O Q N 71- O N M N 00 N • p O p O O p 0 O 0 0 0 0 0 0 0 0 O O r- N m d- Ln ^ 00 00 t\ Ln d� M Ln IN in M 00 0 0 0 0 N 0S O 0 N � 'D c-Cr Ln M M M Ln N. , N M d"' Ln N. 00 CO - r - 1- 1- - N N 1/40 in 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 M 00 r- in d" M 0 0 0 0 0 0 0 0 0 `' N M d- in M in N. o, x- m N. k.o in d- rn N N— 0 a, N. Ln rn 1- rn N in N M d- Ln 10 N. 00 00 O' NN N. Tr-Ni O 0 N N �___ �` 0 V V V O - ------,_ \\N JiU \ •-,33,3333 5,, O 0 \ L11 L 000000o. N-- 000000 U U U V V V V V tO hU nU o0 o0 by;b bO N K 2 K K K K K K 3 3 3 3 3 3 3 3 S-66666666 F o oa n O a2.,22O O O O O O O °° L:3,,: n M n1 01 O O 0O Ear 1.--r-C ) z O \ O � f 0 fNO Lril O O / O O 0O c O N �. O O N. N M 1 O SW Q O1 0 •N 0 0 0 0 0 N. N. Nd- d- Zk01/4.0 in E O I-- 0 0 0 0 0 0 r r 7 0 0" CO 00 '00 00 00 ,C) a) LA O O O d'' d- d' M M M In rt M M rr rn M Z p 0 M M M rr rv-N M M M M r- M • O V 0 Q 0 0 ' N d1 0 N N Q1 00 1.-. n' IN d- M 0 7 00 p 0 N- N. f•- • a1 in 0 0 d- T" ei O • �0 if, O N. O-\• 0\ in �- x- N. n p p •- 0 ' N 0 N m O N °°,,,, Mkl) 7- N. N N M ,- d- dam" N N N 0N M r rM rn 00 N `- N O 0 0 0 0 O 0 i 0 0 0 0 0 00 0 0 0 c0 r . kr) Lrl rr 1 V1 I„ vl M 0 - O 0 N. N d' �O N. a , 00 .- m M Lrl N. a> c- c- N M 71" Ln k0 N. oO 00 c- c- 1— e- N N 1/4O Lf' 0 0 0 0 0 0 O O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 M oO N. kr) Lrl d- M - 0 0 0 0 0 0 _0 0 0 - N rn M d_' Lf Lr. M in f� a1 M ' N rn 71- LN kr) r • co co O N d" 'O N- a `_ 0 6\ -- ___ 0 jib1 O O O L a 000°0 r a 00000000 z uuvuuuuu eoen e000meueoeu %- aasz'zaaa Aaaaaaaaa ,` 0 3 3 v00000 0 0 — Fnv vvuuuu u aogog00 o"gn . 6-n p o oomgO O 0 (----- O p OOOs" . m�� n _ m M rr1 .O CD" O O 00 , % o� • O M N n p O ^^ rrl i • O 7 Ln I— rY1 N e" M p N O o C. M LD _ N r tV O c O1 0 17,j- 0 0 0 0 0 N. N. N. - d- 'CM � � Ln E O I-- o 0 0 0 0 r 7 a" ON CO 00 '00 00 0o av n 111 0 o 00 � r Ln1 .7j- .71- - M rM „,, t1MrnMMMm Z in 0 M M M r,-\ r,-\ M M M M M M• CI 0 0 N a" 0 N N a"' 00 d- N. n d' kr) N V O M 0 7 00 0 0 1--- n n a" Ln IST 0 O� 71- ter• .t' CD M 00 0 7- N d- O N M Ln 7- O N N f., M Cr N. N en M ,- ,- N N N N 0 N- r c M QM N r , N • • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-09 Rig: CD5-09 Plan: CD5-09wp11 Report - Errors 30 November, 2015 To Multiply by 2.58. 0 Schlumberger 0 Comments apply to Report- Errors the line before it. Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: usft Latitude: From: Map Easting: usft Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 Well Rig:CD5-09 Well Position +N/-S 0.00 usft Northing: usfi Latitude: +E/-W 0.00 usft Easting: usfi Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usfl Ground Level: 34.20 usft Wellbore Rig:CD5-09 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2015 11/21/2015 17.91 80.83 57,471 Design CD5-09wp11 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 333.00 Survey Tool Program Date 11/30/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 36.30 550.00 CD5-09wp11 (Rig:CD5-09) INC Inclinometer(Totco/Teledrift) 550.00 1,550.00 CD5-09wp11 (Rig:CD5-09) MWD MWD-Standard 550.00 2,409.72 CD5-09wp11 (Rig:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 36.30 550.00 CD5-09wp11 (Rig:CD5-09) GYD-GC-SS Gyrodata gyro single shots 2,409.72 3,909.72 CD5-09wp11 (Rig:CD5-09) MWD MWD-Standard 2,409.72 13,207.07 CD5-09wp11 (Rig:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 13,207.07 14,707.07 CD5-09wp11 (Rig:CD5-09) MWD MWD-Standard 13,207.07 23,381.41 CD5-09wp11 (Rig:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 36.30 0.00 0.00 0.00 -34.20 0.00 0.00 0.00 100.00 1.15 0.00 0.00 29.50 1.15 0.42 0.42 110.00 1.15 0.00 0.00 39.50 1.15 1.61 1.61 20"x 42" 200.00 1.15 0.00 0.00 129.50 1.15 1.61 1.61 300.00 1.15 0.00 0.00 229.50 1.15 2.65 2.65 11/30/2015 8:57:22AM Page 2 COMPASS 5000.1 Build 74 SSchlumberger 0 Report-Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (°) (usft) (usft) (usft) (usft) 385.00 1.15 0.00 0.00 314.50 1.15 3.51 3.51 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 400.00 1.15 0.22 160.02 329.50 1.15 3.64 3.64 500.00 1.16 1.72 160.00 429.48 1.15 5.36 4.62 600.00 1.18 3.22 160.00 529.39 1.15 7.20 5.09 600.11 1.18 3.23 160.00 529.50 1.15 7.20 5.09 Start 2.5°/100'DLS,0°TF,for 719.7' 700.00 1.25 5.72 160.00 629.07 1.16 7.20 5.08 800.00 1.35 8.22 159.99 728.33 1.15 7.21 5.06 900.00 1.48 10.72 159.98 826.95 1.15 7.23 5.03 1,000.00 1.63 13.22 159.96 924.77 1.15 7.27 5.00 1,100.00 1.79 15.72 159.93 1,021.59 1.14 7.33 4.96 1,200.00 1.96 18.22 159.90 1,117.23 1.14 7.42 4.92 1,300.00 2.14 20.72 159.85 1,211.50 1.14 7.56 4.88 1,319.82 2.17 21.22 159.85 1,230.00 1.13 7.59 4.87 Hold for 107.27' 1,373.45 2.17 21.22 159.81 1,280.00 1.15 7.74 4.90 Base Permafrost 1,400.00 2.17 21.22 159.81 1,304.75 1.15 7.74 4.90 1,427.09 2.18 21.22 159.79 1,330.00 1.15 7.80 4.91 Start 3.87°/100'DLS,24.6°TF,for 716.91' 1,500.00 2.37 23.81 159.81 1,397.35 1.16 7.96 4.86 1,600.00 2.64 27.44 159.64 1,487.50 1.14 7.40 4.73 1,700.00 2.92 31.12 159.64 1,574.72 1.14 7.45 4.63 1,800.00 3.21 34.84 159.73 1,658.59 1.14 7.52 4.52 1,900.00 3.49 38.58 159.94 1,738.75 1.15 7.61 4.39 2,000.00 3.77 42.35 160.27 1,814.81 1.17 7.72 4.24 2,100.00 4.05 46.13 160.76 1,886.45 1.20 7.86 4.08 2,144.00 4.17 47.79 161.00 1,916.48 1.20 7.93 4.00 Hold for 265.72' 2,200.00 4.17 47.79 161.36 1,954.10 1.24 8.04 4.04 2,300.00 4.17 47.79 162.02 2,021.29 1.32 8.25 4.11 2,400.00 2.33 47.79 168.07 2,088.47 1.92 6.04 3.72 2,409.72 2.09 47.79 168.81 2,095.00 1.97 5.83 3.72 Adjust TF to 0°,for 20'-10-3/4"x 13-1/2" 2,429.72 2.09 47.79 168.91 2,108.44 1.98 5.86 3.72 Start 3.87°/100'DLS,11.7°TF,for 306.07' 2,500.00 2.23 50.46 169.43 2,154.42 1.99 6.02 3.66 2,600.00 2.44 54.26 170.60 2,215.49 2.03 6.44 3.59 2,669.92 2.65 56.92 171.96 2,255.00 2.09 7.08 3.54 C-30 2,700.00 2.65 58.06 171.96 2,271.17 2.09 7.08 3.54 2,735.79 2.72 59.43 172.43 2,289.73 2.12 7.35 3.53 Hold for 9319.2' 2,800.00 2.72 59.43 173.23 2,322.40 2.20 7.89 3.60 11/30/2015 8:57:22AM Page 3 COMPASS 5000.1 Build 74 0 Schlumberger S Report- Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 2,900.00 2.73 59.43 174.21 2,373.26 2.35 8.82 3.73 3,000.00 2.74 59.43 174.93 2,424.12 2.53 9.84 3.88 3,100.00 2.74 59.43 175.46 2,474.99 2.72 10.91 4.06 3,200.00 2.75 59.43 175.86 2,525.85 2.92 12.03 4.25 3,300.00 2.75 59.43 176.17 2,576.72 3.14 13.18 4.46 3,400.00 2.76 59.43 176.40 2,627.58 3.36 14.36 4.68 3,500.00 2.77 59.43 176.59 2,678.45 3.59 15.56 4.91 3,600.00 2.78 59.43 176.74 2,729.31 3.83 16.77 5.15 3,700.00 2.78 59.43 176.86 2,780.18 4.08 17.99 5.40 3,800.00 2.79 59.43 176.97 2,831.04 4.32 19.22 5.65 3,900.00 2.80 59.43 177.05 2,881.91 4.57 20.46 5.92 4,000.00 2.80 59.43 175.02 2,932.77 3.02 10.00 4.31 4,100.00 2.81 59.43 175.21 2,983.64 3.14 10.41 4.42 4,200.00 2.82 59.43 175.39 3,034.50 3.25 10.84 4.53 4,300.00 2.83 59.43 175.54 3,085.37 3.37 11.27 4.64 4,400.00 2.83 59.43 175.68 3,136.23 3.49 11.70 4.76 4,500.00 2.84 59.43 175.80 3,187.09 3.61 12.15 4.88 4,600.00 2.85 59.43 175.91 3,237.96 3.74 12.59 5.00 4,700.00 2.86 59.43 176.01 3,288.82 3.86 13.04 5.13 4,800.00 2.87 59.43 176.10 3,339.69 3.99 13.50 5.26 4,900.00 2.88 59.43 176.18 3,390.55 4.12 13.96 5.39 5,000.00 2.89 59.43 176.25 3,441.42 4.25 14.42 5.52 5,100.00 2.90 59.43 176.32 3,492.28 4.38 14.88 5.66 5,200.00 2.91 59.43 176.38 3,543.15 4.51 15.35 5.79 5,300.00 2.92 59.43 176.43 3,594.01 4.64 15.82 5.93 5,400.00 2.93 59.43 176.48 3,644.88 4.77 16.29 6.07 5,459.22 2.94 59.43 176.53 3,675.00 4.90 16.76 6.21 K-3 5,500.00 2.94 59.43 176.53 3,695.74 4.90 16.76 6.21 5,600.00 2.95 59.43 176.57 3,746.61 5.04 17.24 6.35 5,700.00 2.96 59.43 176.61 3,797.47 5.17 17.71 6.49 5,800.00 2.97 59.43 176.65 3,848.34 5.31 18.19 6.64 5,813.10 2.98 59.43 176.68 3,855.00 5.44 18.67 6.78 K3 Basal 5,868.15 2.98 59.43 176.68 3,883.00 5.44 18.67 6.78 K-2 Qannik 5,900.00 2.98 59.43 176.68 3,899.20 5.44 18.67 6.78 5,970.38 3.00 59.43 176.71 3,935.00 5.58 19.15 6.93 K2 Basal 6,000.00 3.00 59.43 176.71 3,950.06 5.58 19.15 6.93 6,100.00 3.01 59.43 176.74 4,000.93 5.71 19.64 7.08 6,200.00 3.02 59.43 176.77 4,051.79 5.85 20.12 7.22 6,300.00 3.03 59.43 176.80 4,102.66 5.99 20.60 7.37 6,400.00 3.04 59.43 176.82 4,153.52 6.12 21.09 7.52 6,500.00 3.05 59.43 176.84 4,204.39 6.26 21.57 7.67 11/30/2015 8:57:22AM Page 4 COMPASS 5000.1 Build 74 SSchlumberger S Report-Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 6,560.18 3.07 59.43 176.86 4,235.00 6.40 22.06 7.82 Albian 97 6,600.00 3.07 59.43 176.86 4,255.25 6.40 22.06 7.82 6,700.00 3.08 59.43 176.88 4,306.12 6.54 22.55 7.98 6,800.00 3.09 59.43 176.90 4,356.98 6.68 23.04 8.13 6,900.00 3.10 59.43 176.92 4,407.85 6.81 23.53 8.28 7,000.00 3.12 59.43 176.93 4,458.71 6.95 24.02 8.44 7,100.00 3.13 59.43 176.95 4,509.58 7.09 24.51 8.59 7,200.00 3.14 59.43 176.96 4,560.44 7.23 25.00 8.74 7,300.00 3.15 59.43 176.98 4,611.31 7.37 25.49 8.90 7,400.00 3.17 59.43 176.99 4,662.17 7.51 25.98 9.05 7,500.00 3.18 59.43 177.00 4,713.03 7.65 26.48 9.21 7,600.00 3.19 59.43 177.01 4,763.90 7.79 26.97 9.37 7,700.00 3.21 59.43 177.03 4,814.76 7.93 27.46 9.52 7,800.00 3.22 59.43 177.04 4,865.63 8.07 27.96 9.68 7,900.00 3.24 59.43 177.05 4,916.49 8.21 28.45 9.84 8,000.00 3.25 59.43 177.06 4,967.36 8.35 28.95 9.99 8,100.00 3.26 59.43 177.06 5,018.22 8.50 29.44 10.15 8,200.00 3.28 59.43 177.07 5,069.09 8.64 29.94 10.31 8,300.00 3.29 59.43 177.08 5,119.95 8.78 30.43 10.47 8,400.00 3.31 59.43 177.09 5,170.82 8.92 30.93 10.63 8,500.00 3.32 59.43 177.10 5,221.68 9.06 31.43 10.79 8,600.00 3.33 59.43 177.10 5,272.55 9.20 31.92 10.95 8,693.29 3.35 59.43 177.11 5,320.00 9.34 32.42 11.11 Albian 96 8,700.00 3.35 59.43 177.11 5,323.41 9.34 32.42 11.11 8,800.00 3.36 59.43 177.12 5,374.28 9.49 32.92 11.27 8,900.00 3.38 59.43 177.12 5,425.14 9.63 33.41 11.43 9,000.00 3.39 59.43 177.13 5,476.00 9.77 33.91 11.59 9,100.00 3.41 59.43 177.14 5,526.87 9.91 34.41 11.75 9,200.00 3.42 59.43 177.14 5,577.73 10.05 34.91 11.91 9,300.00 3.44 59.43 177.15 5,628.60 10.19 35.41 12.07 9,309.76 3.46 59.43 177.15 5,633.56 10.34 35.90 12.23 CD5-09 BoundingPolygon 072715 BP 9,400.00 3.46 59.43 177.15 5,679.46 10.34 35.90 12.23 9,500.00 3.47 59.43 177.16 5,730.33 10.48 36.40 12.39 9,600.00 3.49 59.43 177.16 5,781.19 10.62 36.90 12.55 9,700.00 3.50 59.43 177.17 5,832.06 10.76 37.40 12.71 9,800.00 3.52 59.43 177.17 5,882.92 10.91 37.90 12.88 9,900.00 3.53 59.43 177.18 5,933.79 11.05 38.40 13.04 10,000.00 3.55 59.43 177.18 5,984.65 11.19 38.90 13.20 10,100.00 3.57 59.43 177.18 6,035.52 11.33 39.40 13.36 10,200.00 3.58 59.43 177.19 6,086.38 11.48 39.90 13.52 10,300.00 3.60 59.43 177.19 6,137.25 11.62 40.40 13.69 10,400.00 3.61 59.43 177.19 6,188.11 11.76 40.90 13.85 11/30/2015 8:57:22AM Page 5 COMPASS 5000.1 Build 74 • Schlumberger • Report-Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Veil.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 10,500.00 3.63 59.43 177.20 6,238.97 11.90 41.40 14.01 10,600.00 3.65 59.43 177.20 6,289.84 12.05 41.90 14.17 10,700.00 3.66 59.43 177.20 6,340.70 12.19 42.40 14.34 10,800.00 3.68 59.43 177.21 6,391.57 12.33 42.90 14.50 10,900.00 3.70 59.43 177.21 6,442.43 12.48 43.40 14.66 11,000.00 3.71 59.43 177.21 6,493.30 12.62 43.90 14.83 11,100.00 3.73 59.43 177.22 6,544.16 12.76 44.40 14.99 11,200.00 3.75 59.43 177.22 6,595.03 12.91 44.90 15.15 11,300.00 3.77 59.43 177.22 6,645.89 13.05 45.40 15.31 11,400.00 3.78 59.43 177.22 6,696.76 13.19 45.91 15.48 11,500.00 3.80 59.43 177.23 6,747.62 13.34 46.41 15.64 11,600.00 3.82 59.43 177.23 6,798.49 13.48 46.91 15.81 11,700.00 3.83 59.43 177.23 6,849.35 13.62 47.41 15.97 11,800.00 3.85 59.43 177.23 6,900.22 13.76 47.91 16.13 11,829.07 3.87 59.43 177.24 6,915.00 13.91 48.41 16.30 HRZ Top 11,900.00 3.87 59.43 177.24 6,951.08 13.91 48.41 16.30 12,000.00 3.89 59.43 177.24 7,001.94 14.05 48.91 16.46 12,054.98 3.90 59.43 177.24 7,029.91 14.13 49.19 16.55 Start 3.5°/100'DLS,-46.88°TF,for 1056.55' 12,100.00 4.05 60.51 177.24 7,052.44 14.19 49.40 16.59 12,189.49 5.14 62.70 177.21 7,095.00 14.34 49.77 16.70 HRZ Base/Top Kalubik 12,200.00 5.14 62.96 177.21 7,099.80 14.34 49.77 16.70 12,256.82 6.85 64.38 177.16 7,125.00 14.49 50.05 16.83 K-1 /Lower Kalubik 12,300.00 6.85 65.47 177.16 7,143.30 14.49 50.05 16.83 12,400.00 8.81 68.02 177.08 7,182.79 14.64 50.25 16.93 12,481.80 10.89 70.14 176.98 7,212.00 14.80 50.38 16.99 Kuparuk C 12,487.71 10.89 70.29 176.98 7,214.00 14.80 50.38 16.99 LCU 12,500.00 10.89 70.61 176.98 7,218.11 14.80 50.38 16.99 12,600.00 13.01 73.24 176.84 7,249.14 14.96 50.45 16.99 12,700.00 15.15 75.89 176.69 7,275.75 15.12 50.46 16.92 12,800.00 17.27 78.57 176.51 7,297.86 15.29 50.41 16.79 12,837.69 19.37 79.58 176.31 7,305.00 15.45 50.29 16.62 Alpine C/UJU 12,900.00 19.37 81.26 176.31 7,315.37 15.45 50.29 16.62 13,000.00 21.43 83.97 176.09 7,328.22 15.62 50.12 16.41 13,100.00 23.45 86.69 175.85 7,336.36 15.79 49.88 16.20 13,111.54 23.67 87.00 175.83 7,337.00 15.81 49.85 16.18 Hold for 95.54'-Alpine A-CD5-09 01.Heel 071615 JB 13,200.00 23.76 87.00 175.66 7,341.63 15.87 50.38 16.26 11/30/2015 8:57:22AM Page 6 COMPASS 5000.1 Build 74 • Schlumberger • Report-Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 13,207.07 23.76 87.00 175.65 7,342.00 15.87 50.42 16.26 Adjust TF to 0°,for 20'-7-5/8"x 9-7/8"by 11" 13,227.07 23.76 87.00 175.59 7,343.05 15.87 50.56 16.26 Start 4°/100'DLS,0°TF,for 93.87' 13,300.00 24.02 89.92 175.37 7,345.01 15.88 51.06 15.89 13,320.94 24.09 90.75 175.30 7,344.89 15.88 51.21 15.79 Hold for 7049.52' 13,400.00 24.09 90.75 175.05 7,343.84 15.89 51.79 15.80 13,500.00 24.09 90.75 174.70 7,342.53 15.92 52.55 15.83 13,600.00 24.10 90.75 174.35 7,341.21 15.95 53.35 15.86 13,700.00 24.10 90.75 173.97 7,339.89 15.99 54.19 15.90 13,800.00 24.10 90.75 173.59 7,338.57 16.04 55.06 15.95 13,900.00 24.11 90.75 173.20 7,337.26 16.10 55.97 16.01 14,000.00 24.11 90.75 172.80 7,335.94 16.17 56.90 16.08 14,100.00 24.11 90.75 172.40 7,334.62 16.24 57.86 16.15 14,200.00 24.12 90.75 171.99 7,333.31 16.32 58.85 16.23 14,300.00 24.12 90.75 171.58 7,331.99 16.41 59.87 16.32 14,400.00 24.12 90.75 171.18 7,330.67 16.51 60.91 16.42 14,500.00 24.13 90.75 170.77 7,329.35 16.61 61.98 16.53 14,600.00 24.13 90.75 170.36 7,328.04 16.73 63.07 16.64 14,700.00 24.13 90.75 169.96 7,326.72 16.84 64.18 16.76 14,800.00 24.14 90.75 174.01 7,325.40 16.14 53.99 16.05 14,900.00 24.14 90.75 173.88 7,324.08 16.17 54.27 16.08 15,000.00 24.14 90.75 173.75 7,322.77 16.21 54.56 16.12 15,100.00 24.15 90.75 173.62 7,321.45 16.25 54.85 16.16 15,200.00 24.15 90.75 173.48 7,320.13 16.29 55.14 16.20 15,300.00 24.16 90.75 173.34 7,318.81 16.33 55.44 16.24 15,400.00 24.16 90.75 173.20 7,317.50 16.37 55.75 16.28 15,500.00 24.16 90.75 173.07 7,316.18 16.41 56.05 16.33 15,600.00 24.17 90.75 172.92 7,314.86 16.46 56.37 16.37 15,700.00 24.17 90.75 172.78 7,313.55 16.51 56.68 16.42 15,800.00 24.17 90.75 172.64 7,312.23 16.56 57.00 16.47 15,900.00 24.18 90.75 172.50 7,310.91 16.61 57.33 16.53 16,000.00 24.18 90.75 172.35 7,309.59 16.67 57.66 16.58 16,100.00 24.19 90.75 172.21 7,308.28 16.72 57.99 16.64 16,200.00 24.19 90.75 172.06 7,306.96 16.78 58.33 16.69 16,300.00 24.19 90.75 171.91 7,305.64 16.84 58.67 16.75 16,400.00 24.20 90.75 171.77 7,304.32 16.90 59.01 16.81 16,500.00 24.20 90.75 171.62 7,303.01 16.96 59.36 16.88 16,600.00 24.20 90.75 171.47 7,301.69 17.03 59.71 16.94 16,700.00 24.21 90.75 171.32 7,300.37 17.09 60.07 17.01 16,800.00 24.21 90.75 171.18 7,299.05 17.16 60.43 17.07 16,900.00 24.22 90.75 171.03 7,297.74 17.23 60.79 17.14 17,000.00 24.22 90.75 170.88 7,296.42 17.30 61.16 17.21 11/30/2015 8:57:22AM Page 7 COMPASS 5000.1 Build 74 • Schlumberger • Report-Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 17,100.00 24.22 90.75 170.73 7,295.10 17.37 61.53 17.29 17,200.00 24.23 90.75 170.58 7,293.79 17.44 61.90 17.36 17,300.00 24.23 90.75 170.44 7,292.47 17.52 62.27 17.44 17,400.00 24.24 90.75 170.29 7,291.15 17.60 62.65 17.51 17,500.00 24.24 90.75 170.14 7,289.83 17.67 63.03 17.59 17,600.00 24.24 90.75 169.99 7,288.52 17.75 63.42 17.67 17,700.00 24.25 90.75 169.85 7,287.20 17.83 63.80 17.75 17,800.00 24.25 90.75 169.70 7,285.88 17.92 64.19 17.84 17,900.00 24.26 90.75 169.55 7,284.56 18.00 64.59 17.92 18,000.00 24.26 90.75 169.41 7,283.25 18.09 64.98 18.01 18,100.00 24.27 90.75 169.26 7,281.93 18.17 65.38 18.09 18,200.00 24.27 90.75 169.12 7,280.61 18.26 65.78 18.18 18,300.00 24.27 90.75 168.98 7,279.29 18.35 66.19 18.27 18,400.00 24.28 90.75 168.84 7,277.98 18.44 66.59 18.36 18,500.00 24.28 90.75 168.69 7,276.66 18.53 67.00 18.45 18,600.00 24.29 90.75 168.55 7,275.34 18.63 67.42 18.55 18,700.00 24.29 90.75 168.41 7,274.03 18.72 67.83 18.64 18,800.00 24.30 90.75 168.27 7,272.71 18.82 68.25 18.74 18,900.00 24.30 90.75 168.13 7,271.39 18.91 68.67 18.84 19,000.00 24.31 90.75 168.00 7,270.07 19.01 69.09 18.94 19,100.00 24.31 90.75 167.86 7,268.76 19.11 69.51 19.03 19,200.00 24.31 90.75 167.72 7,267.44 19.21 69.94 19.14 19,300.00 24.32 90.75 167.59 7,266.12 19.31 70.36 19.24 19,400.00 24.32 90.75 167.45 7,264.80 19.41 70.79 19.34 19,500.00 24.33 90.75 167.32 7,263.49 19.52 71.23 19.44 19,600.00 24.33 90.75 167.19 7,262.17 19.62 71.66 19.55 19,700.00 24.34 90.75 167.06 7,260.85 19.73 72.10 19.66 19,800.00 24.34 90.75 166.93 7,259.53 19.84 72.54 19.76 19,900.00 24.35 90.75 166.80 7,258.22 19.94 72.98 19.87 20,000.00 24.35 90.75 166.67 7,256.90 20.05 73.42 19.98 20,100.00 24.36 90.75 166.55 7,255.58 20.16 73.86 20.09 20,200.00 24.36 90.75 166.42 7,254.27 20.27 74.31 20.20 20,300.00 24.37 90.75 166.30 7,252.95 20.39 74.76 20.32 20,370.46 24.37 90.75 166.21 7,252.02 20.47 75.07 20.40 Start 0.07°/100'DLS,96.87°TF,for 3010.95'-CD5-09 02.Toe 071615 JB 20,400.00 24.35 90.75 166.18 7,251.63 20.50 75.20 20.43 20,500.00 24.29 90.74 166.10 7,250.33 20.61 75.56 20.54 20,600.00 24.22 90.74 166.01 7,249.03 20.73 75.92 20.66 20,700.00 24.16 90.73 165.93 7,247.76 20.84 76.29 20.78 20,800.00 24.09 90.72 165.85 7,246.50 20.96 76.66 20.89 20,900.00 24.03 90.71 165.77 7,245.25 21.08 77.03 21.01 21,000.00 23.96 90.70 165.69 7,244.02 21.20 77.41 21.13 21,100.00 23.90 90.69 165.61 7,242.80 21.32 77.78 21.25 21,200.00 23.83 90.69 165.52 7,241.60 21.44 78.16 21.37 21,300.00 23.77 90.68 165.44 7,240.41 21.56 78.55 21.50 11/30/2015 8:57:22AM Page 8 COMPASS 5000.1 Build 74 • Schlumberger III Report-Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 21,400.00 23.70 90.67 165.36 7,239.23 21.68 78.93 21.62 21,500.00 23.64 90.66 165.28 7,238.07 21.80 79.32 21.74 21,600.00 23.57 90.65 165.20 7,236.93 21.92 79.71 21.87 21,700.00 23.51 90.64 165.13 7,235.80 22.05 80.10 21.99 21,800.00 23.44 90.63 165.05 7,234.69 22.17 80.49 22.12 21,900.00 23.38 90.63 164.97 7,233.58 22.30 80.89 22.24 22,000.00 23.31 90.62 164.89 7,232.50 22.42 81.29 22.37 22,100.00 23.25 90.61 164.82 7,231.43 22.55 81.69 22.50 22,200.00 23.18 90.60 164.74 7,230.37 22.68 82.09 22.63 22,300.00 23.12 90.59 164.66 7,229.33 22.81 82.50 22.76 22,400.00 23.05 90.58 164.59 7,228.30 22.94 82.90 22.89 22,500.00 22.99 90.58 164.51 7,227.29 23.07 83.31 23.02 22,600.00 22.92 90.57 164.44 7,226.29 23.20 83.72 23.15 22,700.00 22.86 90.56 164.37 7,225.31 23.33 84.14 23.28 22,800.00 22.79 90.55 164.29 7,224.34 23.46 84.55 23.41 22,900.00 22.73 90.54 164.22 7,223.39 23.59 84.97 23.55 23,000.00 22.66 90.53 164.15 7,222.45 23.72 85.39 23.68 23,100.00 22.60 90.53 164.08 7,221.52 23.86 85.81 23.81 23,200.00 22.54 90.52 164.01 7,220.61 23.99 86.23 23.95 23,300.00 22.47 90.51 163.94 7,219.72 24.13 86.65 24.08 23,381.41 22.42 90.50 163.88 7,219.00 24.24 87.00 24.20 TD:23381.41'MD,7289.5'TVD-CD5-09 03.TD 112515 DK 11/30/2015 8:57:22AM Page 9 COMPASS 5000.1 Build 74 0 Schlumberger • Report- Errors Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Rig:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Rig:CD5-09 North Reference: True Wellbore: Rig:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp11 Database: OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (") (") 13,207.07 7,412.50 7-5/8"x 9-7/8"by 11" 7-5/8 11 23,381.41 7,289.50 4-1/2"x 6-1/2" 4-1/2 6-1/2 110.00 110.00 20"x 42" 20 42 2,409.72 2,165.50 10-3/4"x 13-1/2" 10-3/4 13-1/2 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (0) (0) 12,256.82 7,195.50 K-1/Lower Kalubik 1,373.45 1,350.50 Base Permafrost 5,970.38 4,005.50 K2 Basal 8,693.29 5,390.50 Albian 96 12,189.49 7,165.50 HRZ Base/Top Kalubik 12,487.71 7,284.50 LCU 12,481.80 7,282.50 Kuparuk C 5,459.22 3,745.50 K-3 13,111.54 7,407.50 AlpineA 5,868.15 3,953.50 K-2 Qannik 2,669.92 2,325.50 C-30 11,829.07 6,985.50 HRZ Top 5,813.10 3,925.50 K3 Basal 6,560.18 4,305.50 Albian 97 12,837.69 7,375.50 Alpine C/UJU Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-5 +E/-W (usft) (usft) (usft) (usft) Comment 385.00 385.00 0.00 0.00 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 600.11 600.00 5.69 -2.07 Start 2.5°/100'DLS,0°TF,for 719.7' 1,319.82 1,300.50 148.29 -53.97 Hold for 107.27' 1,427.09 1,400.50 184.77 -67.25 Start 3.87°/100'DLS,24.6°TF,for 716.91' 2,144.00 1,986.98 578.99 -135.33 Hold for 265.72' 2,409.72 2,165.50 775.11 -151.91 Adjust TF to 0°,for 20' 2,429.72 2,178.94 789.87 -153.16 Start 3.87°/100'DLS, 11.7°TF,for 306.07' 2,735.79 2,360.23 1,035.37 -167.50 Hold for 9319.2' 12,054.98 7,100.41 9,053.77 -456.15 Start 3.5°/100'DLS,-46.88°TF,for 1056.55' 13,111.54 7,407.50 10,006.80 -730.96 Hold for 95.54' 13,207.07 7,412.50 10,090.92 -775.97 Adjust TF to 0°,for 20' 13,227.07 7,413.55 10,108.53 -785.39 Start 4°/100'DLS,0°TF,for 93.87' 13,320.94 7,415.39 10,191.27 -829.65 Hold for 7049.52' 20,370.46 7,322.52 16,406.72 -4,154.61 Start 0.07°/100'DLS,96.87°TF,for 3010.95' 23,381.41 7,289.50 19,086.88 -5,525.88 TD:23381.41'MD,7289.5'TVD Checked By: Approved By: Date: 11/30/2015 8:57:22AM Page 10 COMPASS 5000.1 Build 74 Pool Report 0 • O O O O ,c— a N Q W 79,00000 Q Z cn000&& LO N- a-uamd .- 000 ° oo .ncnaanrn6oo Q IL 2 -a ro ry a N V ¢ rrrrr, Fci J w O `�'8 UIU 3 mm°m° s e�8� O 1119-0 m°m Q C 0000& °0a0coo0ci0o ao EhO z00000 00 3 3 0< c clp S.° c m11) ° !' v✓ N OJ ..... 00dill + : 4a : 3 j CZ O.0 1 O W N t ■� tea > 30 C. 3 � s CD ani LO C. 0 D ierto a , 1 O O 0 Q „._c:,-.N cv, O T ai O O O O O O N O O O O O O O LO O Lf) O z N O ti LO N O N N (LI 04911- 009Z) (+)tq-poN/(-)L froS U C'• ,_ , \ / , ,o Y n 3 ., Jo N 3 � _ U Y 0 Q U M if 70,*,,,,,°#::71 ''‘'\\, <') S' .5° / „: ,, •o , .. • U 4 • • • 0 r U • ----\,------- . , • ' \ / \ El.' VN..-..Nr 8 U CD ■ ii f r CL I)) CI V it qtr g N 1 \ . CD • AR CI I M \, , \t, i ck,,: .' \i,,k k i gr.- v- r �sS0 0 0 1 in CI 1 0 1 CD ■ 1 M • • • • U r • • O +t 1 law Ln ItV CI V • • CD5-09wp11 Surface Location 01 j CPAI Coordinate Convert - , l - X I From ----1 To: Datum: INAD83 =..t Region: Jalaska I Datum: jNAD27 Region: alaska v C Latitude/Longitude Decimal Degrees z C Latitude/Longitude [Decimal Degrees j C UTM Zone:1 r South r UTM Zone: True South Ca` State Plane Zone: 4 J Units: jus4t Id ! i a State Plane Zone: 1-4-71,.. Links: us:t t C Legal Desertion(NAD27 only) C Legal Description(NAD27 only) Starting Coordinates: X: 11489418.53 X: 1349385.383565428 Y: 15965618.27 Y: 1 5965872.30583796 Transform i Quit I Help r, __iiiir i CD5-09wp11 Intermediate Casin• i in CPAI Coordinate Convert X Fr om To: ._ _._.__ __ Oat Urn' INAD83 .I Region: ataska f'� Datum: IN4027 j Region: Ialaska 3 r• Latitude/Longitude 'Decimal Degrees .,:.1 C Latitude/Longitude 'Decimal Degrees 1 r UTM Zone: I— South i UTM Zone: True 1 South a State Plane Zone: 4 Units: Fr-s-.1 1E a State Plane Zone: 4 Units: us-it .c Legal Description(NAD27 only) C Legal Description(NAD27 only) i Starting Coordinates: _ _ Ending Coordinates: X: 11488845.70 X: 348812.957779094 Y: 15975722.00 Y: 1 5975976.118901 Transform Quit Help • 0 1 CD5-09wp11 TD a 'rf3 CPAI Coordinate Converter From: To: _. i Datum jNAD83 J Region: lalaska Datum INAD27 Reg jalaska 2 C Latitude/Longitude 'Decimal Degrees C LatiudelLongitude 'Decimal Degrees C UTM Zone:1 r South i C UTM Zone: True r South + State ane Zone: Units: us State Plane Zone: Fr—D. Units: h Legal Description(NAD27 only) i C Legal Description(NAD27 only) : Starting Coordinates: Ending Coordinates: w.._ X 11484278 X: 1 344245 554535339 i Y: 15984811 1 Y: 15985065,33316336 , l r.,...._....Transform..__..... Quit I Help • S 1 CD5-09wp11 Surface Location fty. COAT Coordinate Converter E From. To: Datum: NA083 Region: jalaska _ml Datum: NAD27 Region: lalaska .....mi C Latitude/Longiude 'Decimal Degrees A T Latitude/Longitude (Decimal Degrees C' UTM Zone: ) r South C UTM Zone:(True r South ri State Plane Zone: 11---E, Units: irTs-ir C State Plane Zone: 4 Units: us-ft • +C Legal Description INA.D27 ton' ) 1 1 t: Legal Description(NAD27 only) Starting Coordinates: Legal Description 11489418.53 Township: 1011 N • Range: 1004 1.E.E. Y: 15965618.27 _� Meridian: lU # Section: 18 FNL + (339.10683 (FEL (2593.1697 Transform 71 Quit 1 Help tCD5-09wp11 Intermediate Casing En CPi Coordinate e From: To: Datum: (NAD83 j Region: (alaska Datum: (NAD27 ..�.1 Region: (alaska . C Latitude/Longitude (Decimal Degrees C Latitude/Longitude (Decimal Degrees 4 C UTM Zone:1 — South C UTM Zone: Tru; - r South (: State Plane Zone: 1___� Units: r State Plane Zone: 1-4—:„:1 � A us-ft . � Units: us-fk C Legal Description(N4027 only] (•`" Legal Description(NAD27 only) rStarting Coordinates: _____.. _.._-t Legal Description – _ _.0 X: (1488845.70 Township: 1011 N Range: (004 E i Y: 5975722.00 Meridian: jU Section:16 M FNL ... 1808.05856 FEL • (3329.2625 Transform I Quit I Help t .. ..... w.. m ._...— eA.. 6 • • CD5-09wp11 TD t CPAI Coordinate Converter : ,� "i. , It , From. To i Datum: jNAD83 •1# Region: alaska • i Datum: INAD27 Region: lalaska ( Latitude/Longitude 'Decimal Degrees 211 C Latitude/Longitude [Decimal Degrees • C UTM Zone: I I South C UTM Zone: True r South i t: State Plane Zone: ii---- j Units: lus•ft •J C State Plane Zone: il--E, Units: ru7:6-- .-3 1 C Legal Description(NAD27 only( 1 f: Legal Description(NAD27 only) Starting Coordinates: -- .--.-___, —,...,.,.._._.____a-»--. Legal Description X: 11484278 Township: 1012 N Range: 1003 E . L Y: 15984811 Meridian: lu j Section:125 F ITI:ii7E. 12373.6190 FEL • 13194,1425 Transform it Qui I Help As - built REV DATE BY CK APP i DESCRIPTION REV DATE BY APP DESCRIPTION 1 ##/##115 CZ DB C.A. UPDATED PER K150003ACS ALPINE SATELLITE DEVELOPMENT ' t _ \-/ ,ar LOCATION OF THIS SURVEY / �t ' _0 `6 0 . ; CD4 TO ALPINE 1 .' r C D 5 _7-7'; ` *L4 ACCESS ROAD Pirp le ,...� ':.=sem 'ado 1 .....:r.,..--''r:: 1 tt:rA n, leme.Eralimirip‘....4 o Ly, le .1 _ i C v s, t.„.,)', ` 1k I; w, VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. ER F PPp CD-5 go PAD 0000a�SNNOU° O pES\G22) �x s , , . oN „ o� aL,�x> � �.2 p a. � � yy � 0% \ , C i ..-tt os � 0.61.1. iiii cam:. PLANT N ASPC N 0 a 15'41 52" -0 4 _ 1O Z 37\ (AiKUUKPIK I Z LCMFUC Alpine Survey Office 11r.V ALPINE MODULE:CD50 UNIT: CD ConocoPhil lips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: I PART: REV: 14-12-09-1C ##/##/15 CE-CD50-### 1 OF 3 1 REV DATE BY CK APP DESCRIPTION REV DATE BY • APP DESCRIPTION 1 ##/##/15 CZ DB C.A. UPDATED PER K150003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FNL FWL GND PAD CD5-x01 5,965,661.64 1,489,572.44 70' 18' 49.155" 151' 13' 21.378" 293' 2489' 27.6 34.1 CD5-x02 5,965,656.28 1,489,553.29 70' 18' 49.099" 151' 13' 21.934" 299' 2470' 28.1 34.1 CD5-x03 5,965,650.92 1,489,534.00 70' 18' 49.042" 151' 13' 22.493" 305' 2451' 28.4 34.1 CD5-x04 5,965,645.24 1,489,514.77 70' 18' 48.982" 151' 13' 23.051" 311' 2432' 26.6 34.2 CD5-x05 5,965,639.80 1,489,495.46 70' 18' 48.925" 151° 13' 23.611" 316' 2412' 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70' 18' 48.870" 151' 13' 24.170" 322' 2393' 27.7 34.3 CD5-x07 5,965,629.08 1,489,457.08 70° 18' 48.812" 151' 13' 24.724" 328' 2374' 27.9 34.3 CD5-x08 5,965,623.88 1,489,437.69 70' 18' 48.757" 151' 13' 25.287" 334' 2355' 28.1 34.3 CD5-x09 5,965,618.27 1,489,418.53 70' 18' 48.698" 151' 13' 25.842" 340' 2336' 27.3 34.2 CD5-x10 5,965,613.12 1,489,399.13 70' 18' 48.644" 151' 13' 26.405" 345' 2317' 28.1 34.1 CD5-x11 5,965,607.66 1,489,379.86 70' 18' 48.586" 151' 13' 26.964" 351' 2297' 27.9 34.1 CD5-x12 5,965,602.23 1,489,360.56 70' 18' 48.529" 151' 13' 27.524" 357' 2278' 28.0 34.1 CD5-x13 5,965,596.59 1,489,341.43 70' 18' 48.470" 151' 13' 28.079" 363' 2259' 26.1 34.2 CD5-x14 5,965,591.36 1,489,322.33 70° 18' 48.414" 151' 13' 28.633" 368' 2240' 27.6 34.2 CD5-x15 5,965,586.10 1,489,303.11 70' 18' 48.359" 151' 13' 29.190" 373' 2221' 26.8 34.2 NOTES: KUUKPIK 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. ( I.CMFLLC 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) .r .r. „,L,b„Me..,,,~,,r„,,,.,,,,a.,,„ Alpine Survey Office ys ALPINE MODULE:LD50 UNIT: CD ConocoPhillipsAPINE PROJECT CD-5LWELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 14-12-09-1C ##/##/15 CE-CD50-### 1 OF 3 1 REV DATE BY _ CK APP • DESCRIPTION REV DATE BY APP DESCRIPTION 1 11#/##/15 CZ DB C.A. UPDATED PER K150003ACS NOTES: 1. ALL COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL. ORIGINAL GROUND ELEVATIONS WERE DERIVED FROM THE AVERAGE ELEVATION ALONG THE TOE OF THE CD-4 GRAVEL PAD. 3. BASIS OF COORDINATES: ALPINE PERMANENT CONTROL MONUMENTS PER SURVEY BY KUUKPIK/LCMF, JUNE 2013. 4. DATES OF AS-BUILT SURVEYS: WELL CONDUCTORS CD5-X12, CD5-X13, CD5-X14, CD5-X15, 4/10/15, FB 2015-12 PGS 4-7, 9; CD5-X01 THRU CD5-X11, 4/17/15, FB 2015-10 PGS 49-52; SURVEYOR'S CERTIRCATE .sloasur%vi I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED •••-0"%-•••..F• A�:qs-♦ TO♦ AS—BUILT E LAND REPRESENTS RVEYING IN THE A SURVEY MADE STATE MEE OR UALASKA, NDER THAT MY DIRECT • `;:'�' '''.9 •1• SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST ♦ AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE • *1 49th /\ * ♦� CORRECT. • / / DATE: REGISTRATION NO. LS-5077 • • 0 Donald G. Bruce .' o I. •♦♦'sf No. LS-5077 • • FP ••• •••'��J: KUUKPIK •.4447:10F ESS I ONA\ '�P..�� 1CM F nsenrrxa wdenp wrawsie pO7)V.1ao Alpine (90])0]0«30 Alpine Survey Office ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 14-12-09-1C ##/##/15 CE—CD50—### 1 OF 3 1 • Loepp, Victoria T (DOA) From: Earhart,Will C <William.C.Earhart@conocophillips.com> Sent: Wednesday, December 09, 2015 9:48 AM To: Loepp,Victoria T (DOA) Subject: RE: CRU CD5-09 (215-177) Revised Permit Follow Up Flag: Follow up Flag Status: Flagged Victoria, Those are both planned wells that are not in the ground at this point. We flag planned wells as hazards to increase diligence while drilling nearby wells to prevent future anti-collision issues that could preclude us from using a well slot. Prior to drilling CD5-08 and CD5-10,the anti-collision will be updated using the actual as-drilled surveys from CD5-09. Thanks Will Will Earhart Drilling Engineer-ConocoPhillips Alaska,Inc William.C.Earharta,conocophillips.com ATO-1706 Office:+1.907.265.1077 Mobile:+1.540.448.1789 From: Loepp, Victoria T(DOA) [mailto:victoria.loeop@alaska.gov] Sent: Wednesday, December 09, 2015 9:15 AM To: Earhart, Will C Subject: [EXTERNAL]RE: CRU CD5-09 (215-177) Revised Permit Concerned with the anti-collision major risk failures that were minored for CD5-08 and CD5-10. Please address the minor risking of these wells. From: Earhart, Will C [mailto:William.C.Earhart@conocophillips.com] Sent: Wednesday, December 09, 2015 8:24 AM To: Loepp, Victoria T(DOA) Subject: CRU CD5-09 (215-177) Revised Permit Victoria, I submitted a revised PTD last week for the well we are currently drilling-CRU CD5-09 (PTD 215-177). ConocoPhillips would like to extend the TD of the well by 3000ft to better evaluate the reservoir boundary. Please let me know if you have any questions or concerns. If all goes well,we'd reach the original permitted TD over the weekend/early next week. Thanks Will Will Earhart Drilling Engineer-ConocoPhillips Alaska,Inc William.C.Earhart@conocophillips.com 1 • i TRANSMITTAL LETTER CHECKLIST WELL NAME: C1R�, CS — 09 0Evi...skj_. PTD: 02 /57—/ '' Development Service _Exploratory Stratigraphic Test Non-Conventional FIELD: ©/l./ /)L R I'�� POOL: C t/i ?..u/ r1 -A-lfsv1 €1 JI Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_ - - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements /Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 • S El co ui a) a) 0- a) o� a e' o, E a) . g'' "r, r• Z o, d , a 3 0 0 w, - O W, �, a c .- oz) Lo o y, c) Q M o, 3' �, 3, a) a a) ' (a -0 o , d• cj. a c, o c m O 3a) 0 3 o d 0' as' t 3 0 0 a co' To' E' o' (n, 2 n v, rn = , Z ' > Y• ui. , , a), d 7 M w y m a 0 .3 0 0' N' m' O' of 0 Q (n , W. rn 7 (O' y 1, d O 2' a)' 3 O' co a)' .C' �' L' N' a O' W' G O o' 1. 2 �. , w, y, (a E, N, a aCD c >_ a. O• c cu , in. 2 E aaoi 6. -00o• o . m. . . y. ... . c. o J Oa, Z, a �� CO, �, N, f0 E �, y, .0.., y, N, O, O2 J 12, a, v .0 3, 0 O, a), V, V, w, (n , d J t, Q' c. �. o`OI V ( o, N -, •- 5. 5. 4 _ , aci, I ate) �. -. E. J, 'vi 0 E, -a OU cp t). w, 5. o o. m, c. . Z. . c, . c a) a Z. 3. C a) a) > ;g, c. 0 0) o, 0 - as c, U) v) 0, x , 0, 0) R, c 0, - o E u) c, co. 0 00, �, �� y, t, y a) E �. �. w' 8 al_ 3 . , 0, 'c, co 0 2. _7 0 CN w a, d, co, as g co N J ' w' 0' J' V', �, a, 0, t co 7, L. ± 0, X, (, (a �, a ao, . N c) O ' u V. OU, OO OU �, r, co. a' . Q' p, �' M' 2' 2, w' r, E 0 a > Q v) U) a U) v) U) U) U) v) U) v) U) N, U) U). UD Uh U)', U), U1, U) U), U) y' 0 y, Q m a), a), a), a), a), a), m, m, a), m, a), Q Q. Q, Q. a), a), a), o, o, a), a), Q. a), d, m, m, a), a), d, a), Q; o, a), Q. Q; Q. 0. z. }. }, }, }, >, }, >, }, }, }, } >, z z, z, z, }, }, }, z, Z, }, }, z, }, }, }, }, }, }, }, }, z, z, r, z, z, z, >' i° as .- CO a To C , a), , c E 3, , - E py , , , O. 0 ._'w v 4 0) , C L, p, a E E, ilk , , , LI , ...S\ z oT c _ LI c vv. . , a, lluI . ymON " N, C �, d (a C 0 > 3, p, O` 07 �� a �� 30,w 4 O,Fc vC , u ' 0 0 �, Q 0 U), 0 ay I Z -O, wO c V' 0 a) C. "O a7, a), `a . co O C co. CO. 0 0 0) N r, Uy N C N II wE, E, •c, -o, c c E �, m a o M c, C N >, i- c 00 s, o 0 L c, 0, Q N L a. c ▪ Y ,- ., i -o' 0, m e, y, o o. Q 0c. v 'o: a e. -. 0 ai a. °; o. '3, o > c,„ 2 y J• (/) -0 O O, O, C, 0 7 7 s' -0 0 •p 0' Y, (a, 0� 0 o, a) f6' p, E, (0' •Ip 0 Q, N, -7 (A, T o� OD O N° I 0.0 d 0 E' a 0 0. 0 t, a 0' 0, o c ay - d Z °' ; E 0' 'c' 3 a) a ay r �, 3, w, 0, � E U U Q 0, c, 43' R' W' 0' .7, .7, a, O. a-, 0 O, •O, To, C' a)' 0,, E a). 0 4 0 a d 3, O 0, 3, C E (a, C -o, CO, a a V, E, a), c, O, M, co, r, a), •O" O �, C >. ,-, o U 'c V. y, 0, 3 3, 6 0 4, ., -0 w' 'S. •.-_ 3, f0 a 0 v0), 0, - 0 0 3 :: CO 0 0 w o O d ' d -o. C :O :0 .; ay v' > O' -5,' O' O O' v' O o' a Oa 7' 0 O r' �' U d J -O a- 6, 7, ` CO O, a), m �' y' ,_ co, O' C' O' a) O O C' N O C) vy V' E. y' av E' r co O N' d w' 0 C J 0 d -0, �, O, a) a. 00 O, 0, 0, 0: C, (y U, a �O, 0. ay Y, .O a) ., O• N' E O O' ' m' :J T C' 0, va 0, 0.S' = r, d E, N d d O N, a (Ni_), N, d w � U), 0) d a3 (a a3 O' O) (p' O N' pl p U 3, N, 'E U), O, co' C -c -0 v, as, E o, o, py m 4 m, c, p), > 2, N, a •N, o, a TD d 0) C, �� d d �, N, >. co, a) 0 a), 3, C, •'O, of C, c Cr 0- ay C C, 0 0. d _,, s-, 0. 3. 46 0 a) 0, >,, " N' jr" 0 CO a, •O •0, -0 0 . C, 0,, a, a, .C, -0, r, a) y, •N, 0 a), >, .2 a, r, a) U) 8 O U a C' (p' t, E U 0' E N' tea).,, 7, N, CO, - 0, r, C, C 0' '3 7, N' ' f0' N N' V, s3, = 3 "a O, 0 C 0 V. CO c a), ,Co co, F..!0 a) 0 co CO €, 0 0 0 = a) 0 'O, ,_ (0 - C 0 CO U) CO, U C Z C 3 ((i (0 0 aci m 0 0 0 0 C () (n c, S. a), o o, m $ m . u;, 4 E .3 w e 0 v, IS I 0 a). �' o' o' o' .; .� ay a o' 0 0 o > > 3' 0 a), o w w, a) ar `° 0. ' �, �o, a; _, U �. co 0- � � � EC a) 0, 0 �. 3 c c 'C. i- ►= i-; •6 ami 0 ?, a, a, 0. o. (7, 0 . 0, 0 c ip a), a), C, 0, -0 a a 0 ai ay o, 0, 0, 2. 2; 2 m v, m v, = O, O, r, a) a) m, 'a), a), 0, 0 • cgJ � 5,, 5, 5,, cn4= 00' a' a' U, 5' gaz U, cnU, UciciQ, - Q, = ommU3, y' 2 a' Dcn, co, U, I WdII O - N 0) v (n (O F- 00 O) O N 0) a U) (O F- 00 0y) O N 0) V (f) (O n 00 O) E N M l0 co I� 00 O) N N N N N N N N N N M M M M 0) M 0) %M 0) 0) V U 0 0 0 0 o C la- O C R N (p N (p N V O • I-- i+ 0 O 0 CA 0 O v) I- W a) -! 0 aa -J N C a) O O W Q I•£ `O_ CO C a J O 0. m 0 r -o Q a c •�' 5 d Q a `S;,, a Q w o yoF 713 I y s THE STATE• Alaska Oil and Gas of j Conservation Commission : _ 333 West Seventh Avenue GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 ® X\X - Main: 907.279.1433 ALAS Fax: 907.276.7542 www.aogcc.alaska.gov Graham L. Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Field, Alpine Oil Pool, CRU CD5-09 ConocoPhillips Alaska, Inc. Permit No: 215-177 Surface Location: 339' FNL, 2593.33' FEL, SEC. 18, T11N, R4E, UM Bottomhole Location: 5053.04' FNL, 1822.25' FEL, SEC. 25, T12N, UM Dear Mr. Alvord: Enclosed is the approved application for permit to drill the above referenced development well. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chair DATED this 3 day of November, 2015. STATE OF ALASKA ALISA OIL AND GAS CONSERVATION COMMON OCT 0 6 2015 PERMIT TO DRILL 20 AAC 25.005 AOG r' 1 a.Type of Work: 1 b. Proposed Well Class: Development-Oil E• Service- Winj ❑ Single Zone ❑✓ , lc.Specify if well is proposed for: Drill 2 ,Lateral ❑ Stratigraphic Test ❑ Development-Gas❑ Service-Supply ❑ Multiple Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory ❑ Service- WAG ❑ Service-Disp ❑ Geothermal ❑ Shale Gas ❑ 2.Operator Name: 5. Bond: Blanket ❑• Single Well ❑ 11.Well Name and Number: ConocoPhillips Alaska, Inc. ' Bond No. 59-52-180 CRU CD5-09 3.Address: 6. Proposed Depth: 12. Field/Pool(s): P.O.Box 100360 Anchorage,AK 99510-0360 MD: 20364.6 ' TVD: . 7322.52 Colville River Unit • 4a. Location of Well(Governmental Section): 7. Property Designation(Lease Number): Alpine Pool - Surface: 339'FNL,2593.33' FEL,Sec. 18,T11N,R4E,UM , ASRC NPR4,ASRC NPR2,ASRC NPR1 Top of Productive Horizon: 8. Land Use Permit: 13.Approximate Spud Date: 892.18'FNL,3284.59'FEL,Sec.6,T11N, R4E, UM 932669,932128,932126 11/15/2015 Total Depth: 9.Acres in Property: 14. Distance to Nearest Property: 5053.04'FNL, 1822.25'FEL,Sec.25,T12N,R3E,UM - 15912, 12614.53,27783.48 , 341 to ASRC-NPR4 4b. Location of Well(State Base Plane Coordinates-NAD 27): 10. KB Elevation above I . 70.5 feet 15. Distance to Nearest Well Open Surface: x- 349385 y- 5965872.31 Zone- 4 • GL Elevation above I _ 34.2 feet to Same Pool: 2232.83' 16. Deviated wells: Kickoff depth: . 385 feet 17.Maximum Anticipated Pressures in psig(see 20 AAC 25.035) Maximum Hole Angle: - 90.75 degrees Downhole: 3,650 • Surface: 2,918 • 18.Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity,c.f.or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 74 36 36 110 110 Previously Installed 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2408.6 36 36 2444.6 2165.5 1,083 sx 11.0ppg DeepCrete,271 sx 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7/390oon, L-80/TN110 H-563/BTC 13165.2 36 36 13201.2 7412.5 Stage1 365 sx15.8 ppg G;Stage2:461 sx 15.8 ppg G 6-1/2" 4-1/2" 12.6 L-80 IBTM 7364.6 13,000 7,399 20364.6 7322.5 N/A-uncemented liner with frac sleeve: 19. PRESENT WELL CONDITION SUMMARY(To be completed for Redrill and Re-Entry Operations) Total Depth MD(ft): Total Depth TVD(ft): Plugs(measured): Effect. Depth MD(ft): Effect.Depth TVD(ft): Junk(measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program LI 20 AAC 25.050 requirements[1:1 21. Verbal Approval: Commission Representative: Date: 10/1/2015 22. I hereby certify that the foregoing is true and correct. Contact: Sara Heskin 265-1027 j Email: Sara.Heskin@cop.com Printed Name Cr,„�..,.. L _ Atv-,,.k ,/ Title: Drilling Manager Signature l 1��C ve-t ,! 'lam^/(.. Phone: 265-6120 Date: 8/12/2015 Commission Use Only Permit to DrillAPI Number: Permit Approval See cover letter for other ^ Number: 1 J j- /4.7 50-103-.204 a-OO _p6 Date: 1 i f 3/I requirements. Conditions of approval: If box is checked,well may not be used to explore for,test,or produce coalbed methane,gas hydrates,or gas contained in shales: d Other: 130p,f-�3 to 3 57)0p 5Samples req'd: Yes ❑ No[]/ Mud log req'd:Yes[1] No[t1/ ;�}Yi n vl av p r+'v'e��e � 1.- t° S-0o 2 /2 sl yHZS measures: Yes [2(No❑ Directional svy req'd:Yes Vf. No L i VGi"¢er Vol i.---i ).--)cc el ror v) fc-c/ Spacing exception req'd: Yes ❑ No IX- Inclination-only svy req'd:Yes❑ No b.hGlc'/ 20 AAC 25• 0`35(h)(2) APPROVED BY / / ( Approved by: �{' GaldNALis COMMISSIONER THE COMMISSION Date: / -� Jolz u �Jl✓ n � :3/ �d t�(�/ Submit Form and Form 10-401(Revised 10/2012) i�I„y! a from the date of approval(20 AAC 25.005(g)) Attachments in Duplicate ConocoPhillips Alaska,Inc. • • Post Office Box 100360 Anchorage,Alaska 99510-0360 ConocoPhillips Telephone 907-276-1215 October 5,2015 Alaska Oil and Gas Conservation Commission RECEIVED 333 West 7th Avenue, Suite 100 Anchorage,Alaska 99501 OCT 0 6 2015 Re: Application for Permit to Drill CRU CD5-09 AOGCC Dear Sir or Madam: J�+� 1 ConocoPhillips Alaska, Inc.hereby applies for a Permit to Drill for an onshore production well from the CD5 drilling pad with rig Doyon 19./The intended spud date for this well is 11/15/15. CRU CD5-09 is planned to be an Alpine A and producer. The 13-1/2"surface hole will TD above the C-30 sand and then 10- 3/4"casing will be set. The intermediate section will be drilled with 9-7/8"x 11"underreamer BHA and Managed Pressure Drilling technology. This hole will be subsequently cased with a 7-5/8"casing string to surface and cemented to 500' above the uppermost hydrocarbon bearing interval. The suface by intermediate casing annulus will then be evaluated for future annular disposal by performing a leak-off test. The 6-1/2"production section will then be horizontally drilled and completed as an Alpine A sand producer. The well will be completed with a 4-1/2"solid liner with frac sleeves across the productive zone and tied back to surface with a 3-1/2"gas- lifted upper completion string. It is the intention of ConocoPhillips to hydruallically fracture CD5-09 at a later date. Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling/collision avoidance information as required by 20 AAC 25.050(b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a)and(b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information,please contact Sara Heskin at 265-1027 (Sara.HeskinAConocoPhillips.com)or Chip Alvord at 265-6120. Sincerely, cc: CD5-09 Well File/Sharon Allsup-Drake ATO 1530 auke l/_ Rob Stinson ATO 1720 f'" Chip Alvord ATO 1570 Sara Heskin Jason McLennan ATO 1712 Drilling Engineer Lanston Chin Kuukpik Corp 110 Applica.or Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 CD5-09 Application for Permit to Drill Document ConocoPhillips Table of Contents 1. Well Name 3 Requirements of 20 AAC 25.005(f) 2. Location Summary 3 Requirements of 20 AAC 25.005(c)(2) Requirements of 20 AAC 25.050(b) 3. Blowout Prevention Equipment Information 3 Requirements of 20 AAC 25.005(c)(3) 4. Drilling Hazards Information 4 Requirements of 20 AAC 25.005(c)(4) 5. Procedure for Conducting Formation Integrity Tests 5 Requirements of 20 AAC 25.005(c)(5) 6. Casing and Cementing Program 5 Requirements of 20 AAC 25.005(c)(6) 7. Diverter System Information 5 Requirements of 20 AAC 25.005(c)(7) 8. Drilling Fluid Program 6 Requirements of 20 AAC 25.005(c)(8) 9. Abnormally Pressured Formation Information 7 Requirements of 20 AAC 25.005(c)(9) 10. Seismic Analysis 7 Requirements of 20 AAC 25.005(c)(10) 11. Seabed Condition Analysis 7 Requirements of 20 AAC 25.005(c)(11) 12. Evidence of Bonding 7 CD5-09 APD Page 1 of 15 Printed:5-Oct-15 • Applicallor Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 Requirements of 20 AAC 25.005(c)(12) 13. Proposed Drilling Program 7 Requirements of 20 AAC 25.005(c)(13) 14. Discussion of Mud and Cuttings Disposal and Annular Disposal 9 Requirements of 20 AAC 25.005(c)(14) 15.Attachments 10 Attachment 1 Cement Summary 11 Attachment 2 Drilling Hazards Summary 11 Attachment 3 Completion Schematic 15 Attachment 4 Directional Plan 16 CD5-09 APD Page 2 of 15 Printed:5-Oct-15 • Applicaor Permit to Drill,Well CRU CD5-09 Saved: 5-Oct-15 1. Well Name (Requirements of 20AAC 25.005(f)) The well for which this application is submitted will be designated as CRU CD5-09. 2. Location Summary(Requirements of 20 AAC 25.005(c)(2)) This well is planned for Location at Surface 339' FNL, 2593.33' FEL,Sec. 18,T11N, R4E, UM NAD 1927 RKB Elevation 70.5'AMSL Northings: 5,965,872. Eastings: 349,501 Pad Elevation 34.2'AMSL Top of Productive Horizon(Heel) 892.18' FNL,3284.59' FEL,Sec.6,T11N, R4E, UM NAD 1927 Measured Depth, RKB: 13,105' Northings:5,975,891 Total Vertical Depth, RKB: 7,407.5' Eastings:348,856 Total Vertical Depth,SS: 7,337' Total Depth (Toe) 5053.04' FNL, 1822.25' FEL,Sec. 25,T12N, R3E, UM NAD 1927 Measured Depth, RKB: 20,364.6' Northings: 5,982,358 Total Vertical Depth, RKB: 7,322.5' Eastings: 345,562 Total Vertical Depth,SS: 7,252' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19. CD5-09 APD Page 3of15 Printed:5-Oct-15 • Applicator Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 4. Drilling Hazards Information (Requirements of 20 AAC 25.005(c)(4)) The following presents data used for calculation of anticipated surface pressure(ASP)during drilling of this well: Casing Size Csg Setting Depth Fracture Pore pressure ASP Drilling (in) MD/TVD(ft) Gradient(ppg) (psi) (psi) 20 110/110 10.9 50 51.3 10.75 2,444.6/2,165.5 14.5 1061 1416.2 7.625 13201.2/7,412.5 12.5 3545 2917.8 4.5 20,364.6/7,322.5 12.5 3650 N/A PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE(ASP) ASP is determined as the lesser of 1)surface pressure at breakdown of the formation casing seat with a gas gradient to the surface,or 2)formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP= [(FG x 0.052)-0.1]*D q' r'"1 Where: ASP=Anticipated surface pressure in psi -F FG=Fracture gradient at the casing seat in lb/gal _ '0 "21-) 0.052=Conversion from lb./gal to psi/ft Q 0.1=Gas gradient in psi/ft ; Applicator Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 (B)data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C)data concerning potential causes of hole problems such as abnormally geo-pressured strata,lost circulation zones,and zones that have a propensity for differential sticking; Please see Attachment 2-Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005(c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT/FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing Program Csg/Tbg Hole Weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program OD(in) Size(in) (lb/ft) (ft) (ft) (ft) 20 42 94 H-40 Welded 80 36/36 110/110 Previously Installed HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,385 36/36 2,444/2,165 1083 sx DeepCRETE Lead 11.0 ppg, BTCM 271 sx Class"G"Tail Slurry 15.8 ppg 29.7/39 7-5/8 9.875x1 (last L-80/ HYD 563 14,457 36/36 13,201.2/ Stage 1: 365 sx Class G at 15.8 ppg 1 400ft TN110 X BTCM 7,412 Stage 2: 461 sx Class G at 15.8 ppg 39#) 4-1/2 6.5 12.6 L-80 IBT-M 6,699 13,000/ 20,364.6/ N/A—uncemented liner with frac 7,399 7,322 sleeves 7. Diverter System Information (Requirements of 20 AAC25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h)(2) is granted. At CD5,five penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. 4' l �,`l. eVS4 CD5-09 APD Page 5 of 15 Printed:5-Oct-15 • Applica or Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.5 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0—10.0 ' 9.6—11.5 ' 9.6 ✓ PV cP 9 14 11-15 YP lb./100 ft2 35-80 11-16 13-16 Funnel Viscosity s/qt. 300 50-60 40-50 Initial Gels lb./100 ft2 50 10 6 10 Minute Gels lb./100 ft2 60 15 8 API Fluid Loss cc/30 min. N.C.—10.0 5.0-10.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0—12.0 <10.0 pH 10.8-11.2 9.5-10.0 9.0-9.5 Surface Hole: A mixed-metal oxide fresh water drilling fluid (DrilPlex AR)will be used for the surface interval. Keep flow line viscosity at±200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight< 10.0 ppg by use of solids control system and dilutions where necessary. Intermediate#1: Fresh water gel/polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids(by diluting as required)will all be important in maintaining wellbore stability.The mud will be weighted up to 11.5 before pulling out of the hole. Note: Managed Pressure Drilling(MPD)will be utilized for added backpressure to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with a water-based mud drill-in fluid(Flo-Pro NT)weighted to 9.6 ppg with calcium carbonate and KCI. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-09 APD Page 6 of 15 Printed:5-Oct-15 . Applicallior Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A-Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20AAC25.005(c)(10)) N/A-Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20AAC25.005(c)(11)) N/A-Application is not for an offshore well. 12. Evidence of Bonding(Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20AAC25.005(c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3:Completion Schematic. 1. MIRU Doyon 19 onto CD5-09. 2. Rig up and test riser,dewater cellar as needed. 3. Drill 13.5" hole to the surface casing point as per the directional plan (LWD Program:GR)./ 4. Run and cement 10-3/4"surface casing to surface. 5. Install BOPE and MPD equipment. 6. Test BOPE to 250 psi low/3500 psi high. 7. Pick up and run in hole with 9-7/8"x 11" drilling BHA to drill the intermediate hole section. 8. Pressure test casing to 3500 psi. 9. Drill out 20'of new hole and perform LOT. Maximum LOT to 18.0 ppg. Minimum LOT required to drill ahead is 12.5 ppg EMW. 10. Drill 9-7/8"x 11" hole to section TD. Use Managed Pressure Drilling to maintain constant bottom hole pressure on connections once drilling the lower shales(LWD Program:GR/Res). ✓ 11. Run 7-5/8" casing and cement to 500' above hydrocarbon bearing zones. 12. Test BOPE to 250 psi low/3,500 psi high. 13. Pick up and run in hole with 6-1/2"drilling BHA. Pressure test casing to 3,500 psi. 14. Drill out shoe track and 20 feet of new formation. Perform FIT to 12.Oppg. Minimum required leak-off value is 11.0 ppg EMW. 15. Drill 6-1/2" hole to section TD (LWD Program:GR/Azimuthal Res.). 16. Pull out of hole with drilling BHA. 17. RIH with 4.5" liner completion (solid liner with frac sleeves)on 4"drill pipe. 18. Set liner top packer and release from liner. 19. Displace well to completion fluid. CD5-09 APD Page 7 of 15 Printed:5-Oct-15 • Applicallor Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 20. Run 3.5" upper completion. 21. Space out and land hanger. 22. Install 2-way check and pressure test hanger seals to 5000 psi. Nipple down BOP. 23. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove 2-way check. 24. Test tubing and tubing-casing annulus separately to 3500 psi/30 mins. 25. Shear circulation valve in GLM. 26. Circulate tubing to diesel and install freeze protection in the annulus. 27. Set BPV and secure well. RDMO. CD5-09 APD Page 8 of 15 Printed:5-Oct-15 • 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005(c)(14)) Incidental fluids developed from drilling operations on well CD5-09 will be injected into the surface casing x production casing annulus of CD5-05 and/or CD5-03 and/or CD5-315 wells upon approval.Well CD1-01A will be used as a backup disposal well or for excess fluid volumes. The CD5-09 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000'TVD. Significant hydrocarbon zones include only the Alpine sand based on pre-drill interpretations.There will be 500'of cement fill placed above the top of the Alpine reservoir. Once CD5-09 has been drilled and completed,consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations,per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above,any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. f Surface casing will be set near the base of the Schrader Bluff Formation(C-40). These 450-500'thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure =(12.0 ppg)*(0.052) *(Surf.Shoe TVD)+1,500 psi =(12.0 ppg) * (0.052)* (2,165')+1,500 psi =2851 psi Pore Pressure =1,061 psi Therefore Differential=2851—1061=1790 psi. The internal casing pressure is conservative,since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85%collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85%of 85%of Burst (ppf) Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563 2470 psi 2100 psi 5210 psi 4429 psi 10-3/4" 45.5 L-80 3 BTC-M 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563 4790 psi 4071 psi 6890 psi 5856 psi 7-5/8" 29.7 L-80 3 BTC-M 4790 psi 4071 psi 6890 psi 5856 psi 7-5/8" 39 TN-110 3 HYD563 11080 psi 9418 psi 12620 psi 10727 psi CD5-09 APD Page 9 of 15 Printed:5-Oct-15 • Applicalpor Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 15. Attachments Attachment 1 Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-09 APD Page 10 of 15 Printed:5-Oct-15 • Applicallor Permit to Drill,Well CRU CD5-09 Saved: 5-Oct-15 Attachment 1—Cement Summary CD5-9 Schematic wp_09 20"94#H-40 welded Conductor to 110' 10-3/4"45.5#L-80 HYD563/BTCM 2,444'MD/2,165 TVD @ 59°inc. Top of Cement ✓ 5,425' MD/3,651'TVD K2(Qannik) 5926' MD t 3.953' TVD HES Cementer a CD 0 6,475'MD/4,238 TVD 9-7/8"x11"Hole Top of Cement 12,322'MD/7,223'TVD Alpine C 12,832'MD/7,375'TVD Alpine A 13,105'MD/7,407'TVD 7-5/8"29.7/39#L-B0liN110 Ar ® HYD563 X BTCM Casing ` MCV 6-1/2" Hole 4-1/2"Solid Liner 12.6 ppf L80 IBTM / h 20,365.MD.L7,322,10.91" CD5-09 APD Page 11 of 15 Printed:5-Oct-15 • Applical,Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 10.75"Surface Casing run to 2,445'MD/2,166'TVD Cement from 2445' MD to 1943' (500' of tail)with Class G+Adds. @ 15.8 PPG,and from 1943'to surface with 11.0 ppg DeepCRETE.Assume 250%excess annular volume in permafrost, 50%excess below the permafrost (1373' MD),and zero excess in 20" conductor. Lead slurry from 1,901' MD to surface with DeepCRETE @ 11.0 ppg Conductor (110'—0') X 1.3645 ft3/ft X 1.0(0%excess)= 150 ft3 Permafrost to Conductor (1,373'—110')X 0.3637 ft3/ft X 3.5 (250%excess)= 1,608 ft3 Top of Tail to Permafrost (1,943'—1,373')X 0.3637 ft3/ft X 1.5(S0%excess)=311 ft3 Total Volume= 150+ 1,608+311=2,069 ft3=>1,083 sx of 11.0 ppg DeepCRETE @ 1.91 ft3/sk Tail slurry from 2,401'MD to 1,901'MD with 15.8 ppg Class G+additives Shoe to Top of Tail (2,445'—1,943')X 0.3637 ft3/ft X 1.50(50%excess) =274 ft3 Shoe Joint (80')X 0.5400 ft3/ft X 1.0(0%excess)=43 ft3 Total Volume=274+43=317 ft3=>271 sx of 15.8 ppg Class G+0.2%D046 antifoamer,0.3%D065 dispersant and 0.8%S002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 13,201'MD/7,413'TVD Top of slurry is designed to be at 12,605' MD,which is 500' above the Alpine C.Assume 40%excess annular volume. Tail slurry from 14,493'MD to 13,684'MD with 15.8 ppg Class G+additives Under reamer to Top of Cement (13,096'—12,322')X 0.3439 ft3/ft X 1.40(40%excess) =368 ft3 Shoe to Under reamer (13,201'—13,096')X 0.2148 ft3/ft X 1.40(40%excess) =32 ft3 Shoe Joint (80')X 0.2578 ft3/ft X 1.0(0%excess)=21 ft3 Total Volume=368+32+21=420 ft3=>365 sx of 15.8 ppg Class G+0.2% D046 antifoamer,0.3% D065 dispersant and 0.8%5002 accelerator @ 1.16 ft3/sk Qannik Second Stage from 6893-5853 MD with 15.8 ppg Class G+additives / 1050' MD Across Qannik (6,475'—5,425')X 0.3637 ft3/ft X 1.40(40%excess) =535 ft3 Total Volume=535 ft3=>461 sx of 15.8 ppg Class G+0.2% D046 antifoamer,0.3%D065 dispersant and 0.8%5002 accelerator @ 1.16 ft3/sk CD5-09 APD Page 12 of 15 Printed:5-Oct-15 • Applicalr Permit to Drill,Well CRU CD5-09 Saved:5-Oct-15 Attachment 2—Drilling Hazards Summary (to be posted in Rig Floor Doghouse Prior to Spud) (See Well Plan Attachment: Detailed Risk Information for further discussion of these risks) 13-1/2" Hole/10-3/4"Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots,traveling cylinder diagrams Monitor well at base of permafrost, increased mud weight, Gas Hydrates Low decreased mud viscosity, increased circulating times, controlled drilling rates, low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use weighted sweeps. Reduced pump rates, mud rheology, lost circulation material, use of Lost Circulation Low low density cement slurries 9-7/8"x 11" Hole/7-5/8"Casing Interval Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density(ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Well control drills,increased mud weight. No mapped faults occur Abnormal Reservoir Pressure Low across the path of the planned wellbore. Hydrogen Sulfide gas Low H2S drills,detection systems, alarms,standard well control practices, mud scavengers 6-1/2"/4-1/2"Liner Production Interval Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density(ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills,increased mud weight. Hydrogen Sulfide gas Low H2S drills,detection systems, alarms,standard well control practices, mud scavengers CD5-09 APD Page 13 of 15 Printed:5-Oct-15 • Applicalpor Permit to Drill,Well CRU CD5-09 Saved: 5-Oct-15 Well Proximity Risks: Directional drilling/collision avoidance information as required by 20 ACC 25.050(b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure:Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely,the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik and instability in the production interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-09 APD Page 14 of 15 Printed:5-Oct-15 • Applicator Permit to Drill,Well CRU CD5-09 Saved: 5-Oct-15 Attachment 3—Completion Schematic CD5 -09 Alpine A Producer Proposed Schematic updated 9/25/2015 by S.Heskin 20"94#H-40 Welded A , Conductor to 110' Upper Completion: Length 1)4-%"12.6#/ft IBT-M Tubing(2 jts) XO to 3-W EUE tubing 2)Shallow nipple profile 3)3-W'x1"Camco KBMG GLM (xx')w1DV 7' 103/4"45.5#L-80 I q Hyd 5631BTC 4)3-W x 1"Camco KBMG GLM(xx')wi DV 7' Surface Casing 2,444'MD/2,165'TVD @ 59" 4)3-'/2"x 1"Camco KBMG GLM(xx')w1DCK2 7' cemented to surface pinned for 2500 psi casing to tbg shear 5)SLB BHP Gauge,Encapsulated 1-Wire 1.5' w/cannon clamps on every joint 6)Baker Premier Packer 7)X nipple 2.812"ID 1-5' 8)WLEG 13' Lower Completion: 9) Flexlock Liner Hanger 3T XO 5"Hydril 521 Box X 4-W IBTM pin 10)4%",12.6#/ft•L-80 IBT-M Liner wi ball actuated frac ports every-750' Baker Premier Production Packer Top Ke ervoT at+i A:pine A Sand 7437'T D o o o o o o o o OI 6 112"Hole TD 20,999'MD/7,340'TVD 7 512"29.7139#1-801TN110 4-'4"12.6#L-80 HYD 563x8TCM IBT-M Intermediate Casing Production Liner 13,201'MD/7412'TVD Q 87' 1300'MD 17399'TVD to 20,364'MD/7,322'TVD 90.75' CD5-09 APD Page 15 of 15 Printed:5-Oct-15 s • CD5-09wp09 -ikor 0A c Plan Summary HRZ Base/Top Kalubik Alpine C/UJU / N Ease Permafrost K;1/Lower Kalubik ,,,5_ 1 K-2 Qannik Albian 96 LCU ' Kuparuk C -5 > - K-3 -,- -_AlpineA a13 Baser Basal __-- rn , Albian 97'\ HRZ Top m I of _ C-30 -t I` D I I ' i I '"I‘ I is i I ii I I I I I I I I-rI 0 120"x 42'� 10-3/4"x 13-1/21,'500 9000 13500 18000 , .--'-'----- • /// Measured 117-5/8"x 9-7/8"by 111 I4-1/2"X 6-1/2'1i ......, 0--0,----120"x 42'1 Geodetic Datum: North American Datum 1983 \` ° Depth Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) , \ 103/4"x 13-1/21' Rig: Doyon 19 oo p °O °° a °° 5/8"x 9-7/8"by 111 I4-1/2"x 6-1/2'1 ° o lifi ., 0 up "�n°.mrni ` i N I I I I I I I a I(1 a' to-,i a IdI VP 0 2000 4000 6000 8000 1000P 'R00 400(P 143000:“-' 18000 0 36 - 385 ' Horizontal Departure 385 - 570 330 00 570 - 760 760 - 950 � 950 - 1140 o _.......__. 1140 - 1330 160 CD5-10 •07 2480 3250 r !J(� _ 3250 - 4030 0 306D5-11wpr7 270((!//r 4030 - 4800 1q`L."' :cososwm 4800 - 5580 c CD5-12wpO 5580 - 6350 6350 - 7130 U7130 - 7900 ri7 • '• i‘ 1 Di i I I I I I I I iiiiiiiiiiiiiii 42,....74-:,, I• AA1 7900 - 9460 240 NO" i arl4Vi� % O cos-oa4ao7 0 3000 6000 9000 12000 15000 18000 21000 �'�i�r, j ��� `!. 9460 - 11020 SURVEY PROGRAM Surface Location '$elm fii I N�j 1 " di•a4; 0 • 16:05=0Cf 04 2015 Easting(5000 usft/in) I , H 1 , , , I , , , I , , , I , , I , , I , , I , III I111111 ICDP- v,.. .., ,g,, ,D2' .. 4 CD5-02wp07 CD2 + `klf. CD5-09wp09 CD 03wp0:,TD2-74 ` �\o,� 11 � , D2-07P6 CD 06wp,7 CD2 c.,1 -' _ CD' 12wp,7 ��B «.�� \ \, '463 �p �.�. A� ir A •92-28 I,.`• \� �\•� k ' ••! CD2-462v CD2- �b.`\��1. u . ,..... CD2-7: \ �\;- ;' Prelim: Alpine CC CD5 04 "tt'- - Cr.-07 .87 CD2- ��`��� ' _���'! -�( CD. 1r, .07 \ ' ...ti6.7" '_—a� '. `,i'.• HOU D 99 • NU.SUt 1 �� ���Q���V� CD2-'.-4001.--`� i 4'ii�1,,Vie'( u�'i DZ-33X, _ ' -,< „Ai , ` �2-39PI c � I;� � /� � �+2-53 c�p 61wE 1 � — •—�� �1 D2 •: - Pio c f0 ;3PB1 .i Lso :, =9Sgc - CD5 Alpine West Pas �� CD4-07/ +� O, p �► 3 CD2-33 CD2-4, \ o o �f' Cc -47,1 • ( `• -ll-. Z— CD5-314 !, '' . • _, CD2- to .02 CD2- 6 "2- D2-36PI — CD •o- ' CD2-36 Cps Q9_0 , CD5-05wp10 C•'-: D4- 7 CD5-08wp0 CD4- • O 37 CD5-11wp07 CD 304' �� 1 I ,....,..p..,„,„ ii--319 CD- ,=�,60A3 CD -315 CD 315PB1wp11 Ili -41.k CD5-313PBi p ' 'R CD4 1 � wr':�;.,0.1 94-321 4 `r0 l 111111 - V ." 41 A.,,,,44,t1,420q1 IIIIIIIIII III Tri Fasting(5000 usft/in) • CD5-09wp09 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. 4-1/2"x 6-1/2"_ ... .5 15000— °VIC CD5-09 02 Toe 071615 JB 12000H 7-5/8"x 9-7/8" V"= CD5-09 01 Heel 071615 JB o 0 `?9000— 7000 CD5-09 BoundingPolygon 072715 BP t Z 6000 c6000 5000 4000 3000- 3000 10-3/4"x 13-1/2" % 0 20"x42" -15000 -12000 -9000 -6000 -3000 0 3000 6000 9000 West(-)/East(+) (3000 usft/in) 0 • CD5-09wp09 Section View -2000- 20"x 42" Base Permafrost taA0- 0° C-30 K3 Basal 1p00 K-3 K-2 Qannik '�O oo K2 Basal D 2000 ,---,- o 0o Albian 97 o o O' 0 10-3/4"x 13-1/2" �o hod' bb , eAlbian 96 0 4000- "-«_z_=__ - _ - K-1 /Lower Kalubik oo HRZ Base/Top Kalubik TO O o 0o HRZ Top Kuparuk C ami -o oo Alpine C/UJU o o -LCU v, w 0 6000- ^000%'. Alpine A co p i Alpine A o co - 8000- Alpine A Base 7-5/8"x 9 7/8' by 11" o o o o o o �,a) 4-1/2"x 6-1/2" 10000- I I I 0 2000 4000 6000 8000 10000 12000 14000 16000 Vertical Section at 333.00° (2000 usft/in) • • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-09 Plan: CD5-09 Plan: CD5-09wp09 Report Permit Pack 01 October, 2015 • Schlum • berger Comments apply to Report the line before it. Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska,United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: usft Latitude: From: Map Easting: usft Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° Well Plan:CD5-09 Well Position +N/-S 0.00 usft Northing: usfi Latitude: +EI-W 0.00 usft Easting: usfi Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usfi Ground Level: 34.20 usft Wellbore Plan:CD5-09 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2015 1/15/2016 17.82 80.83 57,470 Design CD5-09wp09 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +N/-S +EI-W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 333.00 Survey Tool Program Date 7/27/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 36.30 900.00 CD5-09wp09(Plan:CD5-09) GYD-GC-SS Gyrodata gyro single shots 900.00 1,900.00 CD5-09wp09(Plan:CD5-09) MWD MWD-Standard 900.00 2,444.61 CD5-09wp09(Plan:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,444.61 3,944.61 CD5-09wp09(Plan:CD5-09) MWD MWD-Standard 2,444.61 13,201.16 CD5-09wp09(Plan CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 13,201.16 14,701.16 CD5-09wp09(Plan:CD5-09) MWD MWD-Standard 13,201.16 20,364.55 CD5-09wp09(Plan:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 36.30 0.00 0.00 36.30 -34.20 0.00 0.00 0.00 100.00 0.00 0.00 100.00 29.50 0.00 0.00 0.05 110.00 0.00 0.00 110.00 39.50 0.00 0.00 0.19 20"x 42" 200.00 0.00 0.00 200.00 129.50 0.00 0.00 0.19 300.00 0.00 0.00 300.00 229.50 0.00 0.00 0.34 10/1/2015 2:39:45PM Page 2 COMPASS 5000.1 Build 74 Schlumberger Report Company: ConocoPhillips(Alaska) Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (0) (0) (usft) (usft) (°/100usft) (0) (usft) 385.00 0.00 0.00 385.00 314.50 0.00 0.00 0.46 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 400.00 0.22 340.00 400.00 329.50 1.50 340.00 0.48 500.00 1.72 340.00 499.98 429.48 1.50 0.00 0.62 600.00 3.22 340.00 599.89 529.39 1.50 0.00 0.77 600.11 3.23 340.00 600.00 529.50 1.50 0.00 0.77 Start 2.5°/100'DLS,0°TF,for 719.7' 700.00 5.72 340.00 699.57 629.07 2.50 0.00 0.91 800.00 8.22 340.00 798.83 728.33 2.50 0.00 1.06 900.00 10.72 340.00 897.45 826.95 2.50 0.00 1.22 1,000.00 13.22 340.00 995.27 924.77 2.50 0.00 1.32 1,100.00 15.72 340.00 1,092.09 1,021.59 2.50 0.00 1.42 1,200.00 18.22 340.00 1,187.73 1,117.23 2.50 0.00 1.65 1,300.00 20.72 340.00 1,282.00 1,211.50 2.50 0.00 1.99 1,319.82 21.22 340.00 1,300.50 1,230.00 2.50 0.00 2.08 Hold for 107.27' 1,373.45 21.22 340.00 1,350.50 1,280.00 0.00 0.00 2.43 Base Permafrost 1,400.00 21.22 340.00 1,375.25 1,304.75 0.00 0.00 2.43 1,427.09 21.22 340.00 1,400.50 1,330.00 0.00 0.00 2.56 Start 3.870/100'DLS,24.6°TF,for 1014.28' 1,500.00 23.81 342.91 1,467.85 1,397.35 3.87 24.60 2.92 1,600.00 27.44 346.04 1,558.00 1,487.50 3.87 21.91 3.50 1,700.00 31.12 348.49 1,645.22 1,574.72 3.87 19.09 4.17 1,800.00 34.84 350.46 1,729.09 1,658.59 3.87 16.95 4.93 1,900.00 38.58 352.10 1,809.25 1,738.75 3.87 15.29 5.78 2,000.00 42.35 353.49 1,885.31 1,814.81 3.87 13.98 2.96 2,100.00 46.13 354.69 1,956.95 1,886.45 3.87 12.93 3.32 2,200.00 49.91 355.74 2,023.83 1,953.33 3.87 12.07 3.70 2,300.00 53.71 356.69 2,085.64 2,015.14 3.87 11.36 4.12 2,400.00 57.52 357.55 2,142.10 2,071.60 3.87 10.77 4.56 2,441.36 59.09 357.88 2,163.84 2,093.34 3.87 10.29 4.75 Hold for 9602.23' 2,444.61 59.09 357.88 2,165.50 2,095.00 0.00 0.00 5.06 10-3/4"x 13-1/2" 2,500.00 59.09 357.88 2,193.95 2,123.45 0.00 0.00 5.06 2,600.00 59.09 357.88 2,245.32 2,174.82 0.00 0.00 5.79 2,700.00 59.09 357.88 2,296.68 2,226.18 0.00 0.00 6.69 2,756.11 59.09 357.88 2,325.50 2,255.00 0.00 0.00 7.70 C-30 2,800.00 59.09 357.88 2,348.05 2,277.55 0.00 0.00 7.70 2,900.00 59.09 357.88 2,399.41 2,328.91 0.00 0.00 8.79 3,000.00 59.09 357.88 2,450.77 2,380.27 0.00 0.00 9.92 3,100.00 59.09 357.88 2,502.14 2,431.64 0.00 0.00 11.09 3,200.00 59.09 357.88 2,553.50 2,483.00 0.00 0.00 12.29 10/1/2015 2:39:45PM Page 3 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 3,300.00 59.09 357.88 2,604.87 2,534.37 0.00 0.00 13.50 3,400.00 59.09 357.88 2,656.23 2,585.73 0.00 0.00 14.73 3,500.00 59.09 357.88 2,707.60 2,637.10 0.00 0.00 15.97 3,600.00 59.09 357.88 2,758.96 2,688.46 0.00 0.00 17.21 3,700.00 59.09 357.88 2,810.32 2,739.82 0.00 0.00 18.46 3,800.00 59.09 357.88 2,861.69 2,791.19 0.00 0.00 19.72 3,900.00 59.09 357.88 2,913.05 2,842.55 0.00 0.00 20.98 4,000.00 59.09 357.88 2,964.42 2,893.92 0.00 0.00 10.34 4,100.00 59.09 357.88 3,015.78 2,945.28 0.00 0.00 10.80 4,200.00 59.09 357.88 3,067.15 2,996.65 0.00 0.00 11.25 4.300.00 59.09 357.88 3,118.51 3,048.01 0.00 0.00 11.71 4,400.00 59.09 357.88 3,169.87 3,099.37 0.00 0.00 12.18 4,500.00 59.09 357.88 3,221.24 3,150.74 0.00 0.00 12.65 4,600.00 59.09 357.88 3,272.60 3,202.10 0.00 0.00 13.11 4,700.00 59.09 357.88 3,323.97 3,253.47 0.00 0.00 13.59 4,800.00 59.09 357.88 3,375.33 3,304.83 0.00 0.00 14.06 4,900.00 59.09 357.88 3,426.70 3,356.20 0.00 0.00 14.54 5,000.00 59.09 357.88 3,478.06 3,407.56 0.00 0.00 15.02 5,100.00 59.09 357.88 3,529.42 3,458.92 0.00 0.00 15.49 5,200.00 59.09 357.88 3,580.79 3,510.29 0.00 0.00 15.98 5,300.00 59.09 357.88 3,632.15 3,561.65 0.00 0.00 16.46 5,400.00 59.09 357.88 3,683.52 3,613.02 0.00 0.00 16.94 5,500.00 59.09 357.88 3,734.88 3,664.38 0.00 0.00 17.43 5,520.67 59.09 357.88 3,745.50 3,675.00 0.00 0.00 17.91 K-3 5,600.00 59.09 357.88 3,786.25 3,715.75 0.00 0.00 17.91 5,700.00 59.09 357.88 3,837.61 3,767.11 0.00 0.00 18.40 5,800.00 59.09 357.88 3,888.97 3,818.47 0.00 0.00 18.89 5,871.11 59.09 357.88 3,925.50 3,855.00 0.00 0.00 19.38 K3 Basal 5,900.00 59.09 357.88 3,940.34 3,869.84 0.00 0.00 19.38 5,925.62 59.09 357.88 3,953.50 3,883.00 0.00 0.00 19.86 K-2 Qannik 6,000.00 59.09 357.88 3,991.70 3,921.20 0.00 0.00 19.86 6,026.86 59.09 357.88 4,005.50 3,935.00 0.00 0.00 20.35 K2 Basal 6,100.00 59.09 357.88 4,043.07 3,972.57 0.00 0.00 20.35 6,200.00 59.09 357.88 4,094.43 4,023.93 0.00 0.00 20.85 6,300.00 59.09 357.88 4,145.80 4,075.30 0.00 0.00 21.34 6,400.00 59.09 357.88 4,197.16 4,126.66 0.00 0.00 21.83 6,500.00 59.09 357.88 4,248.52 4,178.02 0.00 0.00 22.32 6,600.00 59.09 357.88 4,299.89 4,229.39 0.00 0.00 22.81 6,610.92 59.09 357.88 4,305.50 4,235.00 0.00 0.00 23.31 Albian 97 6,700.00 59.09 357.88 4,351.25 4,280.75 0.00 0.00 23.31 10/1/2015 2:39:45PM Page 4 COMPASS 5000.1 Build 74 Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan 34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) ND TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°1100usft) (°) (usft) 6,800.00 59.09 357.88 4,402.62 4,332.12 0.00 0.00 23.80 6,900.00 59.09 357.88 4,453.98 4,383.48 0.00 0.00 24.29 7,000.00 59.09 357.88 4,505.35 4,434.85 0.00 0.00 24.79 7,100.00 59.09 357.88 4,556.71 4,486.21 0.00 0.00 25.28 7,200.00 59.09 357.88 4,608.07 4,537.57 0.00 0.00 25.78 7,300.00 59.09 357.88 4,659.44 4,588.94 0.00 0.00 26.27 7,400.00 59.09 357.88 4,710.80 4,640.30 0.00 0.00 26.77 7,500.00 59.09 357.88 4,762.17 4,691.67 0.00 0.00 27.26 7,600.00 59.09 357.88 4,813.53 4,743.03 0.00 0.00 27.76 7,700.00 59.09 357.88 4,864.90 4,794.40 0.00 0.00 28.26 7,800.00 59.09 357.88 4,916.26 4,845.76 0.00 0.00 28.75 7,900.00 59.09 357.88 4,967.62 4,897.12 0.00 0.00 29.25 8,000.00 59.09 357.88 5,018.99 4,948.49 0.00 0.00 29.75 8,100.00 59.09 357.88 5,070.35 4,999.85 0.00 0.00 30.25 8,200.00 59.09 357.88 5,121.72 5,051.22 0.00 0.00 30.74 8,300.00 59.09 357.88 5,173.08 5,102.58 0.00 0.00 31.24 8,400.00 59.09 357.88 5,224.45 5,153.95 0.00 0.00 31.74 8,500.00 59.09 357.88 5,275.81 5,205.31 0.00 0.00 32.24 8,600.00 59.09 357.88 5,327.17 5,256.67 0.00 0.00 32.74 8,700.00 59.09 357.88 5,378.54 5,308.04 0.00 0.00 33.23 8,723.29 59.09 357.88 5,390.50 5,320.00 0.00 0.00 33.73 Albian 96 8,800.00 59.09 357.88 5,429.90 5,359.40 0.00 0.00 33.73 8,900.00 59.09 357.88 5,481.27 5,410.77 0.00 0.00 34.23 9,000.00 59.09 357.88 5,532.63 5,462.13 0.00 0.00 34.73 9,100.00 59.09 357.88 5,584.00 5,513.50 0.00 0.00 35.23 9,200.00 59.09 357.88 5,635.36 5,564.86 0.00 0.00 35.73 9,265.52 59.09 357.88 5,669.01 5,598.51 0.00 0.00 36.23 CD5-09 BoundingPolygon 072715 BP 9,300.00 59.09 357.88 5,686.72 5,616.22 0.00 0.00 36.23 9,400.00 59.09 357.88 5,738.09 5,667.59 0.00 0.00 36.73 9,500.00 59.09 357.88 5,789.45 5,718.95 0.00 0.00 37.23 9,600.00 59.09 357.88 5,840.82 5,770.32 0.00 0.00 37.73 9,700.00 59.09 357.88 5,892.18 5,821.68 0.00 0.00 38.23 9,800.00 59.09 357.88 5,943.55 5,873.05 0.00 0.00 38.73 9,900.00 59.09 357.88 5,994.91 5,924.41 0.00 0.00 39.23 10,000.00 59.09 357.88 6,046.27 5,975.77 0.00 0.00 39.73 10,100.00 59.09 357.88 6,097.64 6,027.14 0.00 0.00 40.23 10,200.00 59.09 357.88 6,149.00 6,078.50 0.00 0.00 40.73 10,300.00 59.09 357.88 6,200.37 6,129.87 0.00 0.00 41.23 10,400.00 59.09 357.88 6,251.73 6,181.23 0.00 0.00 41.73 10,500.00 59.09 357.88 6,303.10 6,232.60 0.00 0.00 42.23 10,600.00 59.09 357.88 6,354.46 6,283.96 0.00 0.00 42.73 10,700.00 59.09 357.88 6,405.82 6,335.32 0.00 0.00 43.23 10,800.00 59.09 357.88 6,457.19 6,386.69 0.00 0.00 43.73 10/1/2015 2:39:45PM Page 5 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) ND TVDSS DLeg TFace Lat.Error (usft) (°) (°) (usft) (usft) (°/100usft) (°) (usft) 10,900.00 59.09 357.88 6,508.55 6,438.05 0.00 0.00 44.23 11,000.00 59.09 357.88 6,559.92 6,489.42 0.00 0.00 44.73 11,100.00 59.09 357.88 6,611.28 6,540.78 0.00 0.00 45.23 11,200.00 59.09 357.88 6,662.65 6,592.15 0.00 0.00 45.73 11,300.00 59.09 357.88 6,714.01 6,643.51 0.00 0.00 46.23 11,400.00 59.09 357.88 6,765.37 6,694.87 0.00 0.00 46.73 11,500.00 59.09 357.88 6,816.74 6,746.24 0.00 0.00 47.23 11,600.00 59.09 357.88 6,868.10 6,797.60 0.00 0.00 47.74 11,700.00 59.09 357.88 6,919.47 6,848.97 0.00 0.00 48.24 11,800.00 59.09 357.88 6,970.83 6,900.33 0.00 0.00 48.74 11,828.56 59.09 357.88 6,985.50 6,915.00 0.00 0.00 49.24 HRZ Top 11,900.00 59.09 357.88 7,022.20 6,951.70 0.00 0.00 49.24 12,000.00 59.09 357.88 7,073.56 7,003.06 0.00 0.00 49.74 12,043.59 59.09 357.88 7,095.95 7,025.45 0.00 0.00 49.96 Start 3.5°/100'DLS,-46.48°TF,for 1062.03' 12,100.00 60.46 356.23 7,124.35 7,053.85 3.50 -46.48 50.23 12,186.33 62.60 353.80 7,165.50 7,095.00 3.50 -45.66 50.59 HRZ Base/Top Kalubik 12,200.00 62.94 353.42 7,171.76 7,101.26 3.50 -44.49 50.59 12,253.42 64.28 351.97 7,195.50 7,125.00 3.50 -44.32 50.87 K-1 /Lower Kalubik 12,300.00 65.47 350.74 7,215.28 7,144.78 3.50 -43.68 50.87 12,400.00 68.04 348.16 7,254.74 7,184.24 3.50 -43.15 51.07 12,477.65 70.07 346.22 7,282.50 7,212.00 3.50 -42.13 51.20 Kuparuk C 12,483.54 70.22 346.07 7,284.50 7,214.00 3.50 -41.44 51.20 LCU 12,500.00 70.66 345.67 7,290.01 7,219.51 3.50 -41.39 51.20 12,600.00 73.30 343.26 7,320.95 7,250.45 3.50 -41.26 51.27 12,700.00 75.98 340.92 7,347.44 7,276.94 3.50 -40.51 51.27 12,800.00 78.67 338.63 7,369.38 7,298.88 3.50 -39.89 51.22 12,832.41 79.55 337.90 7,375.50 7,305.00 3.50 -39.39 51.10 Alpine C/UJU 12,900.00 81.39 336.38 7,386.69 7,316.19 3.50 -39.25 51.10 13,000.00 84.11 334.17 7,399.32 7,328.82 3.50 -39.00 50.93 13,100.00 86.85 331.98 7,407.20 7,336.70 3.50 -38.72 50.69 13,105.62 87.00 331.86 7,407.50 7,337.00 3.50 -38.55 50.67 Hold for 95.54'-Alpine A-CD5-09 01.Heel 071615 JB 13,108.77 87.00 331.86 7,407.66 7,337.16 0.00 0.00 51.26 AW-7A NA 08Aug13 Heel 13,200.00 87.00 331.86 7,412.44 7,341.94 0.00 0.00 51.26 13,201.16 87.00 331.86 7,412.50 7,342.00 0.00 0.00 51.27 Adjust TF to 0°,for 20'-7-5/8"x 9-7/8"by 11" 13,221.16 87.00 331.86 7,413.55 7,343.05 0.00 0.00 51.41 Start 4°/100'DLS,0°TF,for 93.87' 10/1/2015 2:39:45PM Page 6 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) ND TVDSS DLeg TFace Lat.Error (usft) (0) (0) (usft) (usft) (°/100usft) (0) (usft) 13,300.00 90.15 331.86 7,415.50 7,345.00 4.00 0.00 51.98 13,315.03 90.75 331.86 7,415.39 7,344.89 4.00 0.00 52.10 Hold for 7049.52' 13,400.00 90.75 331.86 7,414.27 7,343.77 0.00 0.00 52.75 13,500.00 90.75 331.86 7,412.95 7,342.45 0.00 0.00 53.55 13,600.00 90.75 331.86 7,411.63 7,341.13 0.00 0.00 54.39 13,700.00 90.75 331.86 7,410.31 7,339.81 0.00 0.00 55.26 13,800.00 90.75 331.86 7,409.00 7,338.50 0.00 0.00 56.16 13,900.00 90.75 331.86 7,407.68 7,337.18 0.00 0.00 57.09 14,000.00 90.75 331.86 7,406.36 7,335.86 0.00 0.00 58.05 14,100.00 90.75 331.86 7,405.04 7,334.54 0.00 0.00 59.04 14,200.00 90.75 331.86 7,403.73 7,333.23 0.00 0.00 60.06 14,300.00 90.75 331.86 7,402.41 7,331.91 0.00 0.00 61.10 14,400.00 90.75 331.86 7,401.09 7,330.59 0.00 0.00 62.17 14,500.00 90.75 331.86 7,399.78 7,329.28 0.00 0.00 63.25 14,600.00 90.75 331.86 7,398.46 7,327.96 0.00 0.00 64.36 14,700.00 90.75 331.86 7,397.14 7,326.64 0.00 0.00 65.49 14,800.00 90.75 331.86 7,395.82 7,325.32 0.00 0.00 55.00 14,900.00 90.75 331.86 7,394.51 7,324.01 0.00 0.00 55.29 15,000.00 90.75 331.86 7,393.19 7,322.69 0.00 0.00 55.58 15,100.00 90.75 331.86 7,391.87 7,321.37 0.00 0.00 55.88 15,200.00 90.75 331.86 7,390.55 7,320.05 0.00 0.00 56.18 15,300.00 90.75 331.86 7,389.24 7,318.74 0.00 0.00 56.49 15,400.00 90.75 331.86 7,387.92 7,317.42 0.00 0.00 56.80 15,500.00 90.75 331.86 7,386.60 7,316.10 0.00 0.00 57.12 15,600.00 90.75 331.86 7,385.28 7,314.78 0.00 0.00 57.44 15,700.00 90.75 331.86 7,383.97 7,313.47 0.00 0.00 57.76 15,800.00 90.75 331.86 7,382.65 7,312.15 0.00 0.00 58.09 15,900.00 90.75 331.86 7,381.33 7,310.83 0.00 0.00 58.42 16,000.00 90.75 331.86 7,380.02 7,309.52 0.00 0.00 58.76 16,100.00 90.75 331.86 7,378.70 7,308.20 0.00 0.00 59.10 16,200.00 90.75 331.86 7,377.38 7,306.88 0.00 0.00 59.44 16,300.00 90.75 331.86 7,376.06 7,305.56 0.00 0.00 59.79 16,400.00 90.75 331.86 7,374.75 7,304.25 0.00 0.00 60.14 16,500.00 90.75 331.86 7,373.43 7,302.93 0.00 0.00 60.50 16,600.00 90.75 331.86 7,372.11 7,301.61 0.00 0.00 60.85 16,700.00 90.75 331.86 7,370.79 7,300.29 0.00 0.00 61.22 16,800.00 90.75 331.86 7,369.48 7,298.98 0.00 0.00 61.58 16,900.00 90.75 331.86 7,368.16 7,297.66 0.00 0.00 61.95 17,000.00 90.75 331.86 7,366.84 7,296.34 0.00 0.00 62.32 17,100.00 90.75 331.86 7,365.52 7,295.02 0.00 0.00 62.69 17,200.00 90.75 331.86 7,364.21 7,293.71 0.00 0.00 63.07 17,300.00 90.75 331.86 7,362.89 7,292.39 0.00 0.00 63.45 17,400.00 90.75 331.86 7,361.57 7,291.07 0.00 0.00 63.83 17,500.00 90.75 331.86 7,360.26 7,289.76 0.00 0.00 64.22 10/1/2015 2:39:45PM Page 7 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD Inc Azi(azimuth) TVD TVDSS DLeg TFace Lat.Error (usft) (°) (0) (usft) (usft) (°/100usft) (0) (usft) 17,600.00 90.75 331.86 7,358.94 7,288.44 0.00 0.00 64.61 17,700.00 90.75 331.86 7,357.62 7,287.12 0.00 0.00 65.00 17,800.00 90.75 331.86 7,356.30 7,285.80 0.00 0.00 65.40 17,900.00 90.75 331.86 7,354.99 7,284.49 0.00 0.00 65.79 18,000.00 90.75 331.86 7,353.67 7,283.17 0.00 0.00 66.19 18,100.00 90.75 331.86 7,352.35 7,281.85 0.00 0.00 66.60 18,200.00 90.75 331.86 7,351.03 7,280.53 0.00 0.00 67.00 18,300.00 90.75 331.86 7,349.72 7,279.22 0.00 0.00 67.41 18,400.00 90.75 331.86 7,348.40 7,277.90 0.00 0.00 67.82 18,500.00 90.75 331.86 7,347.08 7,276.58 0.00 0.00 68.23 18,600.00 90.75 331.86 7,345.76 7,275.26 0.00 0.00 68.65 18,700.00 90.75 331.86 7,344.45 7,273.95 0.00 0.00 69.07 18,800.00 90.75 331.86 7,343.13 7,272.63 0.00 0.00 69.49 18,900.00 90.75 331.86 7,341.81 7,271.31 0.00 0.00 69.91 19,000.00 90.75 331.86 7,340.50 7,270.00 0.00 0.00 70.33 19,100.00 90.75 331.86 7,339.18 7,268.68 0.00 0.00 70.76 19,200.00 90.75 331.86 7,337.86 7,267.36 0.00 0.00 71.19 19,300.00 90.75 331.86 7,336.54 7,266.04 0.00 0.00 71.62 19,400.00 90.75 331.86 7,335.23 7,264.73 0.00 0.00 72.06 19,500.00 90.75 331.86 7,333.91 7,263.41 0.00 0.00 72.49 19,600.00 90.75 331.86 7,332.59 7,262.09 0.00 0.00 72.93 19,700.00 90.75 331.86 7,331.27 7,260.77 0.00 0.00 73.37 19,800.00 90.75 331.86 7,329.96 7,259.46 0.00 0.00 73.81 19,900.00 90.75 331.86 7,328.64 7,258.14 0.00 0.00 74.25 20,000.00 90.75 331.86 7,327.32 7,256.82 0.00 0.00 74.70 20,100.00 90.75 331.86 7,326.01 7,255.51 0.00 0.00 75.14 20,200.00 90.75 331.86 7,324.69 7,254.19 0.00 0.00 75.59 20,300.00 90.75 331.86 7,323.37 7,252.87 0.00 0.00 76.04 20,363.76 90.75 331.86 7,322.53 7,252.03 0.00 0.00 76.33 AW-7A NA 08Aug13 Toe 20,364.55 90.75 331.86 7,322.52 7,252.02 0.00 0.00 76.33 TD:20364.55'MD,7322.52'TVD-4-1/2"x 6-1/2"-CD5-09 02.Toe 071615 JB 10/1/2015 2:39:45PM Page 8 COMPASS 5000.1 Build 74 • Schlumberger • Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name C') C') 110.00 110.00 20"x 42" 20 42 2,444.61 2,165.50 10-3/4"x 13-1/2" 10-3/4 13-1/2 13,201.16 7,412.50 7-5/8"x 9-7/8"by 11" 7-5/8 11 20,364.55 7,322.52 4-1/2"x 6-1/2" 4-1/2 6-1/2 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (0) (0) 13,105.62 7,407.50 Alpine A 5,925.62 3,953.50 K-2 Qannik 5,871.11 3,925.50 K3 Basal 12,483.54 7,284.50 LCU 2,756.11 2,325.50 C-30 8,723.29 5,390.50 Albian 96 12,832.41 7,375.50 Alpine C/UJU 11,828.56 6,985.50 HRZ Top 12,477.65 7,282.50 Kuparuk C 12,186.33 7,165.50 HRZ Base/Top Kalubik 1,373.45 1,350.50 Base Permafrost 5,520.67 3,745.50 K-3 12,253.42 7,195.50 K-1 /Lower Kalubik 6,026.86 4,005.50 K2 Basal 6,610.92 4,305.50 Albian 97 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 385.00 385.00 0.00 0.00 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 600.11 600.00 5.69 -2.07 Start 2.5°/100'DLS,0°TF,for 719.7' 1,319.82 1,300.50 148.29 -53.97 Hold for 107.27' 1,427.09 1,400.50 184.77 -67.25 Start 3.87°/100'DLS,24.6°TF,for 1014.28' 2,441.36 2,163.84 817.01 -149.37 Hold for 9602.23' 12,043.59 7,095.95 9,050.12 -454.19 Start 3.5°/100'DLS,-46.48°TF,for 1062.03' 13,105.62 7,407.50 10,006.80 -730.96 Hold for 95.54' 13,201.16 7,412.50 10,090.92 -775.97 Adjust TF to 0°,for 20' 13,221.16 7,413.55 10,108.53 -785.39 Start 4°/100'DLS,0°TF,for 93.87' 13,315.03 7,415.39 10,191.27 -829.65 Hold for 7049.52' 20,364.55 7,322.52 16,406.72 -4,154.61 TD:20364.55'MD,7322.52'ND Checked By: Approved By: Date: 10/1/2015 2:39:45PM Page 9 COMPASS 5000.1 Build 74 • • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-09 Plan: CD5-09 CD5-09wp09 Clearance Summary Anticollision Report 01 October, 2015 Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Plan:CD5-09-Plan:CD5-09-CD5-09wp09 Well Coordinates: Datum Height: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Scan Range: 0.00 to 20,364.55 usft.Measured Depth. Scan Radius is 2,232.83 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED.All wellpaths within 200'+100/1000 of reference Scan Type: 25.00 • • • ConocoPhillips(Alaska)Inc.-WNS Western North Slope Anticollision Report for Plan: CD5-09-CD5-09wp09 Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Plan:CD5-09-Plan:CD5-09-CDS-09wp09 Scan Range: 0.00 to 20,364.55 usft.Measured Depth. Scan Radius is 2,232.83 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft CD5 Alpine West Pad CD5-04-CD5-04-CD5-04 449.26 98.82 449.26 91.06 450.00 12.731 Centre Distance Pass-Major Risk CD5-04-CD5-04-CD5-04 573.80 99.43 573.80 89.88 575.00 10.413 Clearance Factor Pass-Major Risk CD5-05-CD5-05-CD5-05 274.50 79.70 274.50 74.95 275.00 16.802 Centre Distance Pass-Major Risk CD5-05-CD5-05-CD5-05 524.38 81.78 524.38 72.85 525.00 9.153 Clearance Factor Pass-Major Risk CD5-05-CD5-05-CD5-05wp10 374.90 79.89 374.90 73.20 375.00 11.944 Centre Distance Pass-Major Risk CD5-05-CD5-05-CD5-05wp10 698.84 81.73 698.84 69.39 700.00 6.621 Clearance Factor Pass-Major Risk CD5-313-CD5-313-CD5-313 149.80 80.10 149.80 77.06 150.00 26.419 Centre Distance Pass-Major Risk CD5-313-CD5-313-CD5-313 524.75 80.72 524.75 72.01 525.00 9.262 Clearance Factor Pass-Major Risk CD5-313-CD5-313PB1-CD5-313PB1 149.80 80.10 149.80 77.06 150.00 26.419 Centre Distance Pass-Major Risk CD5-313-CD5-313PB1-CD5-313PB1 524.75 80.72 524.75 72.01 525.00 9.262 Clearance Factor Pass-Major Risk CD5-314-CD5-314-CD5-314 199.61 99.86 199.61 95.83 200.00 24.748 Centre Distance Pass-Major Risk CD5-314-CD5-314-CD5-314 474.61 100.95 474.61 92.88 475.00 12.496 Clearance Factor Pass-Major Risk Plan:CD5-01-Plan:CD5-01-CD5-01wp07 334.20 159.89 334.20 154.04 300.00 27.335 Centre Distance Pass-Major Risk Plan:CD5-01-Plan:CD5-01-CD5-01wp07 434.09 160.79 434.09 153.20 400.00 21.197 Clearance Factor Pass-Major Risk Plan:CD5-02-Plan:CD5-02-CD5-02wp07 384.20 139.89 384.20 133.17 350.00 20.808 Centre Distance Pass-Major Risk Plan:CD5-02-Plan:CD5-02-CD5-02wp07 583.79 141.69 583.79 131.50 550.00 13.895 Clearance Factor Pass-Major Risk Plan:CD5-03-Plan CD5-03-CD5-03wp08.1 599.79 119.91 599.79 109.31 600.00 11.315 Centre Distance Pass-Major Risk Plan CD5-03-Plan CD5-03-CD5-03wp08.1 824.45 121.77 824.45 107.22 825.00 8.370 Clearance Factor Pass-Major Risk Plan:CD5-06-Plan:CD5-06-CD5-06wp07 384.20 59.89 384.20 53.16 350.00 8.908 Centre Distance Pass-Major Risk Plan:CD5-06-Plan:CD5-06-CD5-06wp07 658.37 61.26 658.37 49.75 625.00 5.323 Clearance Factor Pass-Major Risk Plan:CD5-07-Plan:CD5-07-CD5-07wp07 384.20 39.89 384.20 33.17 350.00 5.933 Centre Distance Pass-Major Risk Plan:CD5-07-Plan:CD5-07-CD5-07wp07 583.89 40.58 583.89 30.45 550.00 4.009 Clearance Factor Pass-Major Risk Plan:CD5-08-Plan:CD5-08-CD5-08wp07 384.20 19.88 384.20 13.16 350.00 2.957 Centre Distance Pass-Major Risk Plan:CD5-08-Plan:CD5-08-CD5-08wp07 583.97 20.79 583.97 10.58 550.00 2.037 Clearance Factor Pass-Major Risk Plan:CD5-10-Plan:CD5-10-CD5-10wp07 484.21 20.08 484.21 11.62 450.00 2.373 Centre Distance Pass-Major Risk Plan:CD5-10-Plan:CD5-10-CD5-10wp07 584.01 20.53 584.01 10.54 550.00 2.055 Clearance Factor Pass-Major Risk Plan:CD5-11-Plan CD5-11-CD5-11wp07 509.23 40.05 509.23 31.16 475.00 4.501 Centre Distance Pass-Major Risk Plan:CD5-11-Plan:CD5-11-CD5-11wp07 658.82 40.80 658.82 29.28 625.00 3.543 Clearance Factor Pass-Major Risk 01 October,2015- 14:38 Page 2 of 6 COMPASS • • ConocoPhillips(Alaska)Inc.-WNS Western North Slope Anticollision Report for Plan: CD5-09-CD5-09wp09 Tray.Cylinder North Proximity Scan on Current Survey Data(North Reference) Reference Design: CD5 Alpine West Pad-Plan:CD5-09-Plan:CD5-09-CD5-09wp09 Scan Range: 0.00 to 20,364.55 usft.Measured Depth. Scan Radius Is 2,232.83 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on She Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name-Wellbore Name-Design (usft) (usft) (usft) (usft) usft Plan:CD5-12-Plan:CD5-12-CD5-12wp07 384.20 60.12 384.20 53.40 350.00 8.942 Centre Distance Pass-Major Risk Plan:CD5-12-Plan:CD5-12-CD5-12wp07 1,656.78 74.30 1,656.78 41.85 1,625.00 2.290 Clearance Factor Pass-Major Risk Plan:CD5-99-Plan:CD5-99-CD5-99wp08 375.10 179.92 375.10 173.23 375.00 26.888 Centre Distance Pass-Major Risk Plan:CD5-99-Plan:CD5-99-CD5-99wp08 599.03 180.88 599.03 170.70 600.09 17.763 Clearance Factor Pass-Major Risk Rig:CD5-315-CD5-315-CD5-315wp12 550.19 119.68 550.19 110.09 550.00 12.479 Centre Distance Pass-Major Risk Rig:CD5-315-CD5-315-CD5-315wp12 625.07 120.23 625.07 109.52 625.00 11.229 Clearance Factor Pass-Major Risk Rig:CD5-315-CD5-315-CD5-315 424.55 117.96 424.55 110.47 425.00 15.753 Centre Distance Pass-Major Risk Rig:CD5-315-CD5-315-CD5-315 499.61 118.48 499.61 109.83 500.00 13.691 Clearance Factor Pass-Major Risk Rig:CD5-315-CD5-315PB1-CD5-315PB1wp11 550.19 119.68 550.19 110.09 550.00 12.479 Centre Distance Pass-Major Risk Rig:CD5-315-CD5-315PB1-CD5-315PB1wp11 625.07 120.23 625.07 109.52 625.00 11.229 Clearance Factor Pass-Major Risk Rig:CD5-315-CD5-315PB1-CD5-315PB1 424.55 117.96 424.55 110.47 425.00 15.753 Centre Distance Pass-Major Risk Rig:CD5-315-CD5-315PB1-CD5-315PB1 499.61 118.48 499.61 109.83 500.00 13.691 Clearance Factor Pass-Major Risk Rig:CD5-315-CD5-315ST1-CD5-315ST1wp12 550.19 119.68 550.19 110.08 550.00 12.466 Centre Distance Pass-Major Risk Rig:CD5-315-CD5-315ST1-CD5-315ST1wp12 625.07 120.23 625.07 109.51 625.00 11.218 Clearance Factor Pass-Major Risk Survey tool oroaram From To Survey/Plan Survey Tool (usft) (usft) 36.30 900.00 CD5-09wp09 GYD-GC-SS 900.00 1,900.00 CD5-09wp09 MWD 900.00 2,444.61 CD5-09wp09 MWD+IFR-AK-CAZ-SC 2,444.61 3,944.61 CD5-09wp09 MWD 2,444.61 13,201.16 CD5-09wp09 MWD+IFR-AK-CAZ-SC 13,201.16 14,701.16 CD5-09wp09 MWD 13,201.16 20,364.55 CD5-09wp09 MWD+IFR-AK-CAZ-SC 01 October,2015- 14:38 Page 3 of 6 COMPASS • • ConocoPhillips(Alaska)Inc.-WNS Western North Slope Anticollision Report for Plan: CD5-09-CD5-09wp09 Ellipse error terms are correlated across survey tool tie-on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor=Distance Between Profiles/(Distance Between Profiles-Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 01 October,2015- 14:38 Page 4 of 6 COMPASS • • 14:50, October 01 2015 CD5-09w 09 Ladder View pThe Reference Well is along the X-axis. rror Ellipses are the Sum of the Reference and Offset Well Errors m n as = 3 H 3 Am ee 0 m an a a s CO so V U U i 1, 300-- _ _- Ilii E 0 'IL II--,. 12 I 11 -aN ,illII � IIII itl 150 I o mIIIIVP� Pill / 0 �Ia) . � 0— •wI[I AIM'IIrl _ IU''I'✓I Ill Equivelant Magnetic Distance 0 f I I 1 I I I I I I I I I I I I I I I I I I I I I I I I I I I I 0 3000 6000 9000 12000 15000 18000 21000 Displayed interval could be less than entire well:Measured Depth 36.30 To 20364.55 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 36.30 900.00 CD5-09wp09 (Plan: CD5-09) GYD-GC-SS 110.00 110.00 20"x 42" 900.00 1900.00 CD5-09wp09 (Plan: CD5-09) MWD 2165.513344.61 10-3/4" x 13-1/2" 900.00 2444.61 CD5-09wp09 (Plan: CD5-09) MWD+IFR-AK-CAZ-SC 7412'1201716/8"x 9-7/8" by 11" 2444.61 3944.61 CD5-09wp09(Plan: CD5-09) MWD 7322E2364.55 4-1/2"x 6-1/2" 2444.61 13201.16 CD5-09wp09 (Plan: CD5-09) MWD+IFR-AK-CAZ-SC 13201.1614701.16 CD5-09wp09 (Plan: CD5-09) MWD 13201.16 20364.55 CD5-09wp09 (Plan: CD5-09) MWD+IFR-AK-CAZ-SC '.,-,:z00 w 4m o o m CO UU U. Ai I c60— Lcocu ti la ,(2 - ------I .0 I )!1 30—o j U Ell) - I J_Ii I 1 a) - 0 Equivelant Magnetic[Satan:.'.' - 0 0 500 1000 1500 2000 2500 3000 3500 Partial Measured Depth 3b .560 CD5-09wp09 m410 Inc Azi TVD Dleg TFace get 385 570 36.30 0.00 0.00 36.30 0.00 0.00 36.30 To 20364.55 385.00 0.00 0.00 385.00 0.00 0.00 570 -- 760 600.11 3.23 340.00 600.00 1.50 340.00 760 950 1319.82 21.22 340.00 1300.50 2.50 0.00 14:53,October 01 2015 1427.09 21.22 340.00 1400.50 0.00 0.00 950 " 1140 2441.36 59.09 357.88 2163.84 3.87 24.60 c,-- ,s DETAILS 12043.59 59.09 357.88 7095.95 0.00 0.00 1140 1330 13105.62 87.00 331.86 7407.50 3.50 -46.48 CD5-09 01.Heel 071615 JB TVD MD Name 13201.16 87.00 331.86 7412.50 0.00 0.00 1330 1510 110.00 110.00 20" x 42" 13221.16 87.00 331.86 7413.55 0.00 0.00 2165.50 2494.61 10-3/4" x 13-1/2" 1510 1700 7912.50 13201.18-5/8" x 9-7/err by 11r 13315.03 90.75 331.86 7415.39 4.00 0.00 7322.52 20364.55 9-1/2" a 6-1/2" 20364.55 90.75 331.86 7322.52 0.00 0.00 CD5-09 02.Toe 071615 JB 1700 2480 SUMP PmW9att 2480 3250 SU Depth _®°-;e°To Survey/Plan Tool 36.30 5-02,09 (Plan: C05-09) 020-6C-66 3250 4030 3-02rp09 (Plan: CDS-09, 900.00 24.61 -02,09 (Plan: m5-09( -AS-caS-SC 2444 61 3211:61 m5 90 -0909 (Plan: C05-091 651D 4030 4800 2.4 61 1.16 c0-09ap09 (Plan: C05-09) -AF-CAE-SC .16 CO3-099009 (Plan:C05-09) 13301.16 1,]01 19MO 63 13:01.16 P936,.53 ro3-999P99 (Mart 05-99( 1963010-Alt-CAS-SC 4800 _........_ 5580 5580 6350 6350 7130 7130 7900 7900 9460 0/360 9460 11020 � 11020 12570 12570 14130 -30/330 Win, �210 .444.<41:4%>N\ 30 14130 15690 195 ' 180-- ` ` 15690 17250 ��165 ` 17250 18810 �� ` 18810 20365 � 150__ -60/300 120 _ \.%. .... ., .`.01 9 0 .- CD5-02wp07 O � v ..., , . .. p D5-01w 07 , ` O� ` CD5 03w.- ` 1\\�,,,,;//4/1///t i y /t/7Tf i7//4VIN nI:\ ! .6 111'' , �.\o,;;,#.,114,�„1l i i,,a,E w1 111//I!//:A - - - i.(,1.1'1'' 111'1, �� 4y, / 11 iV�il III .1 1. -90/270- �`�,•9•Ro��+i7jr}+ fu�ii�l.s r. � - ����!A�� 1 � ����� ; /J/ ca q� fit► • d v ''i'i'i: 1 a- e / CD5-05 e 1,,11;e / 'l>i , �,Y 6 « Irl 1 , f Y�44. re 1 i ti�\�1#�0� yt ' ,r I' z r�. , / / 1 CD5-99w 08 k*\\\ 1410!bc!,:i;:-7-- , Pa .-:.L � ��I.w 4 ;.I`� �n� y1 /Ilrq'�Ilf�I�i( 1 • %. l\'s� �', y`� '/�'t� j CD5-12w 07 4,���tN;': r i•�2'c ,�� /"�ro. 6 , d3� �1�\� i4/i�si,A,'y�1/� t,a 4- �a ( a IPi , e� s ' ►�so!i pt.�� y , Yom,.e • �T1_ ir C - 120/240 ` J ` :-:-..:P4.1040:,,.........' '4.. . - s• s. a� „f0 : .', ../.� , s�� 120 :.a ' Ci,.�� i /IrcrI161 a gierAi .. � at 4 402,eyiii. �f 6i� -r. ;����•' r' ZidS;.Gi •.., ��wi A�Ibi� � -GU`J'�14 ,,`,61tIp;�� `� : 165 --:=;04,;0,.,' r ;\ } -CD5-08wp07 CD5-315 `, `:`� ; ^: + 180 y•aDri-� / `.....44,,:.i :i..Q`w '% �'. ' CD5-07W 07 . �=�. �a��•1- 195 Vii. . P CD5-315P61\ -- ��,� �.:�• .La• r.� 0i ritzy :� �.•.��; 10 In t " 150 CD5-11w 07 CD5-315ST1wp12 `4•; . �'� .. P -tom CD5-10w 07 CD5-315PB1wp11 P p 6531 -100/180 CD5-315wp12 CD5-314 CD5-313PB1 • octobattet2015 Easting(5000 usft/in) I I 111111 1 1 I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 III , ICDb2jp67„ 1 1 1 1 1 F � 1 � � 11� � � I � � ! F I � � � � I 1 CD5-09wp09 CD'03wp08.1 _ NOT a S'ider CD 06wp 7 CD5- wp0' - CD2 Alpine Pad CD5-04 — C •-07wp07 CD; .07 9 D 9 Prelim: Alpine CD2 to Alpine West I 111. = CD5 Alpine West Pad �� - O rn- CD5-314 —cD c _ - c _ N t: _ Z —7 pp55 5-01wp07 albgwp10 CD5-08wp07 CD5-11 wp07 _ CD5-315 CD5-315PB9- — CD5-313PB1 - CD5-315PB1wp11 CD5-313 — CD5-315wp12 CD5-315ST1wp12 - � � � I � � � � I � � � � I � � � � 1 � � � � 1 � � � � 1 � I 11111 111111 1111111111 111 1 11 11 1 11111 Easting(5000 usft/in) AC Flipbook • • casing Detaik Survey Program TVD MD Name Depth From Depth To Survey/Plan Tool CDS-o9wpog 110.05 44.61 26"x42" 36.30 900.00 CDS o9Tog(PIan:CDSo9) GVD-GC-SS 366 385 1165.50 249461 to-3l9"x 134/1" 900.00 1900.00 CDS-09v+P09(Plan:CD5-09) MWD 7912.50 13201.16 ]i/6"x4718"by/2" 900.00 0444.61 CDSu9vryo9(Plan:CDS-09) MWD+IFR-AK-CAZ-SC 7321.52 20364.55 41/2"x64/2" x949�br 3994.61 CDS-o9vvPo9(PIan:CDS-o9) MWD -------� 570 36.30 To 1000.00 194961 13101.16 CD5-09.Po9(PIan:CD5-09) MWD.IFRAK AZ SC 3 5 13201.16 142o1.160364.55 CDS-09v.To9(Plan:CDS-09) MWD 13201.16 20364.55 CDS-o9wTo9(Plan:CDS-09) MWD+IFR-AK-CAZ-SC 570 760 MD Azi 0 / 360 760 950 36.30 0.00 90 950 1140 385.00 0.00 -30 133 1 0600.11340.001140 1330 1319.82 340.00 111111;1 1330 1510 1427.09 340.00 ' 60 allPabllr4 1510 1700 244t36 357.88 12043.59 357.88 -60 / 300 60 1700 2480 13105.62 331.86 . 2480 3250 13201.16 331.86 Al* 4111.11311111Nte '-- ,, ._ 3250 4030 13221.16 331.86 ^ ': �/�s, - law 5 4 3 4 ..II 9��.�p o 0 8 13315.03 331.86 /k : - 20364.55 331.86 - _ 800 5580�,; iii. i:. .3 4 90 / 2]0 ss of , 1tf1Jt1 !Iifi7130, ` I0/ 7900 v �. ... ,9...��s..,a�.W% . �'ip:,liou �4,4i �'�! 7900 9460 V-'1".---11P-46- 4 i o,.�k to ��1�•1 iIIk � �\1/1s�►.�.� 11020 -120 / A I • �`a. ,';i°�I��1i/i��W-41,11 Attailiii ALIEN%�.1�� �'l'j'`y�I� 120 9460 CD Ai!B1 �i�,� �► `II lo.� 1�i?��� 11020 12570 VW \``��`I1 �� �,`-�� 57 4 3 �'1 ` � 12 0 1 1 0 -150 ��aiir1 0 14130 15690 / 210 tri/IpAr OW O] 5 15690 17250 -180 / 180 17250 18810 18810 20365 15:03,October 01 2015 • • Casing Details Survey Program ND MD Name Depth From Depth To Survey/Plan Tool CDS-o9wpo9 710.00 110.00 /o"x41" 36.30 goo.. CD5-o9wpo9(Plan:CDS-09) GYDGCSS 36 385 .5.5. x494.61 to-;/4 xt;t/x" goo.00 1900.00 CDS-o9wpo9(Plan:CDS-o9) MWD ]41x.50 03x01.16 7118 "x 4]/B"bY n" goo.00 194961 CDS-4414009(Plan:CD5-o9) MWDA FRAK-CAZ-SC 7315.51 5036455 4.1/x"16-t/2" 2444.61 3944.61 CDS-09wpo9(Plan:CD5-09) MWD 1000.00 2000.00 2444.61 13101.16 CD5-09wpo9(Plan:CD5-o9) MWD+IFR-AK-CAZ-SC 385 570 To 1;xat.t6 14701.16 CDS-0941104(Plan:CDS-09) MWD 13201.16 x0364.55 CD5.09wp09(Plam CDS-o9) MWD+IFR-AK-CAZ-SC 570 76o M D Azi 0 / 360 76o 95o 36.30 0.00 90 950 1140 385.00 0.00 -30 / 33 - Litiori2 600.11 340.001140 1330 1319.82 340.00 •■■g**4 PA ik 1330 1510 1427.09 340.00 •. 60 4Ah, 1510 1700 2441.36 357.88 12043 59 357.88 -60 / j00 4‘41 0 1700 2480 _..., 13105.62 331.86 2480 3250 ,,,. OW 13201.16 331.86Imo- •13221.16 331.86 %�` 3o 3250 4030 ^��..�AV��� ��Iits,1 �� 4030 4800 13315.03 331.86 CD -1 ,,0,-, =��;4\, 0 20364.55 1.86 5 �'�'`�- .%All 3 4.55 33 4800 5580 -go / 270 ���•,.,,�. 90 r ,. 5580 6350 /' ��, 6350 7130 .,s= /% � *Argillk #,N,i�� 7130 7900 �� ,.......„..,,,-...„.. 00 9460 120 240 �����j�� �� "" i'�� 120 9460 11020 '��` 6 �����.....,,A .-�I�1 �l'' 11020 12570 eA t ��w:,■.`i1 --A. -- -ii 12570 14130 i 411���i. er i�, _��Weir.--f/ 14130 15690 150 / 277444444,70k� '1�� ill • 9 5 1 6 0 17250 -180 / 180 17250 18810 18810 20365 15:14,October 01 2015 • • Casing Details sarvey Program TVDTo Survey/Plan From Dep MD Name Depth Depth Tool CD5-ogwpog no.0o 44.61 zo'x9z" 36.3o goo.00 <DSogwpoq(PIamCDS-oq) GYDGC55 36 385 3165.50 394961 103/9"x13-1/z" 900.00 1900.00 CD3-09K'po4(Plan:CDS-09) MWD 7411.50 13301.16 1i/✓s"x 91/8"by n" 9a o.oa 2444.61 .5.04,4,00(Plan:CO3-04) MWD4I6643K-4AZ-SC 7322.52 2036455 4-1/2"x6-1/2" 2444.61 3944.61 CD5-09wp09(PIan:C0409) MWD 2000.00 To 3000.00 949.61 t;201.16 <DS o9wpo9(Plan:CD5-09) MW041FR-AK-A-SC 385 570 13201.16 14101.16 CD3-06wpo9(Plan:CD3-09) MWD t3lot.t6 1036455 CDSo9w'P09(Plan:CDSoq) MWD4IFR-AK-CAZ-SC 570 760 MD Azi 0 / 360 76o 950 36.30 0.00 9° 950 1140 385.00 0.00 -30 33• �� 0 600.11 340.00 � 1140 1330 1319.82 340.00 . . 1330 1510 1427.09 340.00 e.A.IIIIW* ' 1 10 1 00 2441.36 357.88 OW1160 S 7- 60 12043.59 357.88 60 300 1700 z48o 13105.62 331.86 . 2480 3250 13201.16 331.86 .7 �� 3 0 IltS1 3250 4030 13221.16 331.86 133,5.03 331.86 k---.: 4030 4800 20364.55 331.86 du a.. 90 / 270 ' 1 v if„ 90 E 0 //%� ir‘ Ith .i. 7900 `r . 7900 9460 • 60 11020 -120 / 240 `� 120 94 6 0O 11020 12570 V•' r• 12570 14130 14130 15690 , 210 ■■ -150 150 90 15690 17250 -180 /180 17250 18810 18810 20365 15:15,October 01 2015 0 • Casing Details Survey Program TVD MD Name Depth From Depth To Survey/Plan Tool CDS-o9wpo9 0.00 0.00 xo"x4x" 36.3o 900.00 CD5-o9wpo9(Plan:CD5o9) GVDLCss 3�-x 385 x165.50 x99461 20-3/4"x 13't/z" 900.00 1900.00 CDS-o9wpo9(Plan:CDS-o9) MWD ]91x.50 03x01.26 7118"x4 ]/X6-"bytt" 900.00 x99961 C05o9wpo9(Plan:CDS-09) MWD.IFR-AK-CAZ-SC 7302.52 20364.55 4-1/2""x6.1/z" 044.61 3944.62 CD5-o9wpo9(Plan:CD5'09) MWD 570 3000.00 To 20364.55444'61 13201.16 CDS ogwpog(Plan:CD ) MWD.IFR-AK-CAZ-SC 385 13x01.16 24702.16 CD5-09wpo9(Plan:CD5-o9) MWD 13201.16 20369.55 CD5-09wp09(Plan:CD5o9) MWD.IFR-AK-CAZ-SC 570 760 MD Azi 0 / 360 76o 95o 36.3o 0.o0 0 95o __ __ 1140 385.00 0.00 -30 / 33• 1149 o 600.11340.00 114° 133° 1319.82 340.00 OASIII MT* 1330 1510 14x7.09 340.00 60 1510 1700 2441.36 357.88 12043.59 357.88 60 / 300 . 60 1700 2480 13105.62 331.86 . 2480 3250 13201.16 331.86 tit ihr ' -- 13221.16 331.86 . � 3�5° 4°3° 13315.03 331.86f. . 4030 4800 20364.55 331.8690 / 2]0 . #A----3-ow , . 90 4800 __ 5580 111111 „ • 5580 6350 635o 7130 1111 71307900 7 00 460 9 9 60 _..___-.- 11020 -120 / 240 120 94 IVW. `6 0 . 11020 12570 . IIII r• 1257014130 • 14130 15690 -150 210 � C.150 5 / 9 0 15690 17250 -180 / 180 17250 18810 18810 20365 15:16,October oi 2015 • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Plan: CD5-09 Plan: CD5-09 Plan: CD5-09wp09 Error Ellipse Report 01 October, 2015 Multiply by 2.58 Schlumberger Comments apply to Error Ellipse Report the line before it. Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Project Western North Slope,North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: usft Latitude: From: Map Easting: usft Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° Well Plan:CD5-09 ,,Z,..4,.,,t...ANX1,1.......V. .W..»k.,V. Well Position +N/-S 0.00 usft Northing: usfl Latitude: +E/-W 0.00 usft Easting: usft Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 34.20 usft Wellbore Plan:CD5-09 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2015 1/15/2016 17.82 80.83 57,470 Design CD5-09wp09 Audit Notes: Version: Phase: PLAN Tie On Depth: 36.30 Vertical Section: Depth From(TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) 36.30 0.00 0.00 333.00 Survey Tool Program Date 7/27/2015 From To (usft) (usft) Survey(Wellbore) Tool Name Description 36.30 900.00 CD5-09wp09(Plan:CD5-09) GYD-GC-SS Gyrodata gyro single shots 900.00 1,900.00 CD5-09wp09(Plan:CD5-09) MWD MWD-Standard 900.00 2,444.61 CD5-09wp09(Plan:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,444.61 3,944.61 CD5-09wp09(Plan:CD5-09) MWD MWD-Standard 2,444.61 13,201.16 CD5-09wp09(Plan:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 13,201.16 14,701 16 CD5-09wp09(Plan:CD5-09) MWD MWD-Standard 13,201.16 20,364.55 CD5-09wp09(Plan:CD5-09) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 36.30 0.00 0.00 0.00 -34.20 0.00 0.00 0.00 100.00 1.15 0.00 0.00 29.50 1.15 0.05 0.05 110.00 1.15 0.00 0.00 39.50 1.15 0.19 0.19 20"x 42" 200.00 1.15 0.00 0.00 129.50 1.15 0.19 0.19 300.00 1.15 0.00 0.00 229.50 1.15 0.34 0.34 10/1/2015 2:55:21PM Page 2 COMPASS 5000.1 Build 74 • Schlumberger • Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Veil.Error Lat.Error Horz.Error (usft) (usft) (0) (°) (usft) (usft) (usft) (usft) 385.00 1.15 0.00 0.00 314.50 1.15 0.46 0.46 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 400.00 1.15 0.22 45.00 329.50 1.15 0.48 0.48 500.00 1.15 1.72 45.00 429.48 1.15 0.62 0.62 600.00 1.16 3.22 69.67 529.39 1.15 0.77 0.77 600.11 1.16 3.23 69.67 529.50 1.15 0.77 0.77 Start 2.5°/100'DLS,0°TF,for 719.7' 700.00 1.16 5.72 69.36 629.07 1.15 0.91 0.91 800.00 1.17 8.22 67.26 728.33 1.15 1.06 1.05 900.00 1.18 10.72 161.15 826.95 1.15 1.22 1.19 1,000.00 1.19 13.22 159.97 924.77 1.15 1.32 1.26 1,100.00 1.21 15.72 159.21 1,021.59 1.14 1.42 1.27 1,200.00 1.22 18.22 159.20 1,117.23 1.14 1.65 1.29 1,300.00 1.24 20.72 159.25 1,211.50 1.13 1.99 1.34 1,319.82 1.25 21.22 159.26 1,230.00 1.13 2.08 1.35 Hold for 107.27' 1,373.45 1.25 21.22 159.29 1,280.00 1.14 2.43 1.41 Base Permafrost 1,400.00 1.25 21.22 159.29 1,304.75 1.14 2.43 1.41 1,427.09 1.26 21.22 159.30 1,330.00 1.14 2.56 1.43 Start 3.87°/100'DLS,24.6°TF,for 1014.28' 1,500.00 1.28 23.81 159.54 1,397.35 1.15 2.92 1.49 1,600.00 1.32 27.44 160.41 1,487.50 1.15 3.50 1.60 1,700.00 1.38 31.12 161.61 1,574.72 1.17 4.17 1.73 1,800.00 1.45 34.84 162.93 1,658.59 1.19 4.93 1.88 1,900.00 1.55 38.58 164.25 1,738.75 1.24 5.78 2.05 2,000.00 1.53 42.35 162.36 1,814.81 1.14 2.96 1.67 2,100.00 1.61 46.13 163.98 1,886.45 1.17 3.32 1.74 2,200.00 1.69 49.91 165.46 1,953.33 1.21 3.70 1.81 2,300.00 1.77 53.71 166.81 2,015.14 1.26 4.12 1.89 2,400.00 1.87 57.52 168.02 2,071.60 1.34 4.56 1.96 2,441.36 1.91 59.09 168.47 2,093.34 1.36 4.75 1.98 Hold for 9602.23' 2,444.61 1.95 59.09 169.09 2,095.00 1.35 5.06 2.03 10-3/4"x13-1/2" 2,500.00 1.95 59.09 169.09 2,123.45 1.35 5.06 2.03 2,600.00 1.96 59.09 170.83 2,174.82 1.40 5.79 2.07 2,700.00 1.96 59.09 172.32 2,226.18 1.49 6.69 2.16 2,756.11 1.97 59.09 173.44 2,255.00 1.63 7.70 2.29 C-30 2,800.00 1.97 59.09 173.44 2,277.55 1.63 7.70 2.29 2,900.00 1.98 59.09 174.25 2,328.91 1.80 8.79 2.45 3,000.00 1.99 59.09 174.85 2,380.27 2.00 9.92 2.65 3,100.00 2.00 59.09 175.30 2,431.64 2.21 11.09 2.86 3,200.00 2.01 59.09 175.65 2,483.00 2.43 12.29 3.10 10/1/2015 2:55:21PM Page 3 COMPASS 5000.1 Build 74 • Schlumberger Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 3,300.00 2.01 59.09 175.92 2,534.37 2.67 13.50 3.35 3,400.00 2.02 59.09 176.14 2,585.73 2.91 14.73 3.61 3,500.00 2.03 59.09 176.31 2,637.10 3.16 15.97 3.88 3,600.00 2.04 59.09 176.46 2,688.46 3.41 17.21 4.16 3,700.00 2.05 59.09 176.58 2,739.82 3.66 18.46 4.44 3,800.00 2.06 59.09 176.68 2,791.19 3.92 19.72 4.73 3,900.00 2.07 59.09 176.77 2,842.55 4.18 20.98 5.02 4,000.00 2.08 59.09 174.94 2,893.92 2.60 10.34 3.26 4,100.00 2.10 59.09 175.10 2,945.28 2.73 10.80 3.39 4,200.00 2.11 59.09 175.24 2,996.65 2.85 11.25 3.53 4,300.00 2.12 59.09 175.37 3,048.01 2.98 11.71 3.67 4,400.00 2.13 59.09 175.48 3,099.37 3.11 12.18 3.81 4,500.00 2.14 59.09 175.59 3,150.74 3.24 12.65 3.95 4,600.00 2.15 59.09 175.68 3,202.10 3.37 13.11 4.10 4,700.00 2.17 59.09 175.77 3,253.47 3.50 13.59 4.24 4,800.00 2.18 59.09 175.85 3,304.83 3.64 14.06 4.39 4,900.00 2.19 59.09 175.92 3,356.20 3.77 14.54 4.54 5,000.00 2.20 59.09 175.99 3,407.56 3.91 15.02 4.69 5,100.00 2.22 59.09 176.05 3,458.92 4.04 15.49 4.84 5,200.00 2.23 59.09 176.11 3,510.29 4.18 15.98 4.99 5,300.00 2.24 59.09 176.16 3,561.65 4.31 16.46 5.15 5,400.00 2.26 59.09 176.21 3,613.02 4.45 16.94 5.30 5,500.00 2.27 59.09 176.25 3,664.38 4.59 17.43 5.45 5,520.67 2.28 59.09 176.29 3,675.00 4.73 17.91 5.61 K-3 5,600.00 2.28 59.09 176.29 3,715.75 4.73 17.91 5.61 5,700.00 2.30 59.09 176.33 3,767.11 4.86 18.40 5.77 5,800.00 2.31 59.09 176.37 3,818.47 5.00 18.89 5.92 5,871.11 2.33 59.09 176.40 3,855.00 5.14 19.38 6.08 K3 Basal 5,900.00 2.33 59.09 176.40 3,869.84 5.14 19.38 6.08 5,925.62 2.34 59.09 176.43 3,883.00 5.28 19.86 6.24 K-2 Qannik 6,000.00 2.34 59.09 176.43 3,921.20 5.28 19.86 6.24 6,026.86 2.36 59.09 176.46 3,935.00 5.42 20.35 6.40 K2 Basal 6,100.00 2.36 59.09 176.46 3,972.57 5.42 20.35 6.40 6,200.00 2.37 59.09 176.49 4,023.93 5.56 20.85 6.56 6,300.00 2.39 59.09 176.52 4,075.30 5.70 21.34 6.72 6,400.00 2.40 59.09 176.54 4,126.66 5.84 21.83 6.87 6,500.00 2.42 59.09 176.57 4,178.02 5.98 22.32 7.03 6,600.00 2.43 59.09 176.59 4,229.39 6.12 22.81 7.19 6,610.92 2.45 59.09 176.61 4,235.00 6.26 23.31 7.36 Albian 97 6,700.00 2.45 59.09 176.61 4,280.75 6.26 23.31 7.36 10/12015 2::55:21PM Page 4 COMPASS 5000.1 Build 74 • Schlumberger • Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 6,800.00 2.46 59.09 176.63 4,332.12 6.40 23.80 7.52 6,900.00 2.48 59.09 176.65 4,383.48 6.54 24.29 7.68 7,000.00 2.49 59.09 176.67 4,434.85 6.68 24.79 7.84 7,100.00 2.51 59.09 176.68 4,486.21 6.82 25.28 8.00 7,200.00 2.53 59.09 176.70 4,537.57 6.97 25.78 8.16 7,300.00 2.54 59.09 176.72 4,588.94 7.11 26.27 8.32 7,400.00 2.56 59.09 176.73 4,640.30 7.25 26.77 8.49 7,500.00 2.58 59.09 176.75 4,691.67 7.39 27.26 8.65 7,600.00 2.59 59.09 176.76 4,743.03 7.53 27.76 8.81 7,700.00 2.61 59.09 176.77 4,794.40 7.67 28.26 8.97 7,800.00 2.63 59.09 176.78 4,845.76 7.82 28.75 9.14 7,900.00 2.64 59.09 176.80 4,897.12 7.96 29.25 9.30 8,000.00 2.66 59.09 176.81 4,948.49 8.10 29.75 9.46 8,100.00 2.68 59.09 176.82 4,999.85 8.24 30.25 9.63 8,200.00 2.70 59.09 176.83 5,051.22 8.38 30.74 9.79 8,300.00 2.71 59.09 176.84 5,102.58 8.53 31.24 9.95 8,400.00 2.73 59.09 176.85 5,153.95 8.67 31.74 10.12 8,500.00 2.75 59.09 176.86 5,205.31 8.81 32.24 10.28 8,600.00 2.77 59.09 176.87 5,256.67 8.95 32.74 10.45 8,700.00 2.78 59.09 176.88 5,308.04 9.09 33.23 10.61 8,723.29 2.80 59.09 176.88 5,320.00 9.24 33.73 10.77 Albian 96 8,800.00 2.80 59.09 176.88 5,359.40 9.24 33.73 10.77 8,900.00 2.82 59.09 176.89 5,410.77 9.38 34.23 10.94 9,000.00 2.84 59.09 176.90 5,462.13 9.52 34.73 11.10 9,100.00 2.86 59.09 176.91 5,513.50 9.66 35.23 11.27 9,200.00 2.87 59.09 176.91 5,564.86 9.81 35.73 11.43 9,265.52 2.89 59.09 176.92 5,598.51 9.95 36.23 11.60 CD5-09 BoundingPolygon 072715 BP 9,300.00 2.89 59.09 176.92 5,616.22 9.95 36.23 11.60 9,400.00 2.91 59.09 176.93 5,667.59 10.09 36.73 11.76 9,500.00 2.93 59.09 176.94 5,718.95 10.23 37.23 11.93 9,600.00 2.95 59.09 176.94 5,770.32 10.38 37.73 12.09 9,700.00 2.97 59.09 176.95 5,821.68 10.52 38.23 12.26 9,800.00 2.99 59.09 176.95 5,873.05 10.66 38.73 12.42 9,900.00 3.00 59.09 176.96 5,924.41 10.81 39.23 12.59 10,000.00 3.02 59.09 176.96 5,975.77 10.95 39.73 12.75 10,100.00 3.04 59.09 176.97 6,027.14 11.09 40.23 12.92 10,200.00 3.06 59.09 176.98 6,078.50 11.23 40.73 13.08 10,300.00 3.08 59.09 176.98 6,129.87 11.38 41.23 13.25 10,400.00 3.10 59.09 176.99 6,181.23 11.52 41.73 13.41 10,500.00 3.12 59.09 176.99 6,232.60 11.66 42.23 13.58 10,600.00 3.14 59.09 177.00 6,283.96 11.81 42.73 13.74 10,700.00 3.16 59.09 177.00 6,335.32 11.95 43.23 13.91 10,800.00 3.18 59.09 177.00 6,386.69 12.09 43.73 14.07 10/1/2015 2:55:21PM Page 5 COMPASS 5000.1 Build 74 • Schlumberger • Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 10,900.00 3.20 59.09 177.01 6,438.05 12.24 44.23 14.24 11,000.00 3.22 59.09 177.01 6,489.42 12.38 44.73 14.40 11,100.00 3.23 59.09 177.02 6,540.78 12.52 45.23 14.57 11,200.00 3.25 59.09 177.02 6,592.15 12.67 45.73 14.73 11,300.00 3.27 59.09 177.02 6,643.51 12.81 46.23 14.90 11,400.00 3.29 59.09 177.03 6,694.87 12.95 46.73 15.07 11,500.00 3.31 59.09 177.03 6,746.24 13.10 47.23 15.23 11,600.00 3.33 59.09 177.04 6,797.60 13.24 47.74 15.40 11,700.00 3.35 59.09 177.04 6,848.97 13.38 48.24 15.56 11,800.00 3.37 59.09 177.04 6,900.33 13.52 48.74 15.73 11,828.56 3.39 59.09 177.05 6,915.00 13.67 49.24 15.89 HRZ Top 11,900.00 3.39 59.09 177.05 6,951.70 13.67 49.24 15.89 12,000.00 3.41 59.09 177.05 7,003.06 13.81 49.74 16.06 12,043.59 3.42 59.09 177.05 7,025.45 13.87 49.96 16.13 Start 3.5°/100'DLS,-46.48°TF,for 1062.03' 12,100.00 3.61 60.46 177.05 7,053.85 13.95 50.23 16.19 12,186.33 4.85 62.60 177.02 7,095.00 14.10 50.59 16.32 HRZ Base/Top Kalubik 12,200.00 4.85 62.94 177.02 7,101.26 14.10 50.59 16.32 12,253.42 6.67 64.28 176.97 7,125.00 14.25 50.87 16.47 K-1 /Lower Kalubik 12,300.00 6.67 65.47 176.97 7,144.78 14.25 50.87 16.47 12,400.00 8.71 68.04 176.89 7,184.24 14.40 51.07 16.59 12,477.65 10.85 70.07 176.78 7,212.00 14.56 51.20 16.66 Kuparuk C 12,483.54 10.85 70.22 176.78 7,214.00 14.56 51.20 16.66 LCU 12,500.00 10.85 70.66 176.78 7,219.51 14.56 51.20 16.66 12,600.00 13.02 73.30 176.65 7,250.45 14.72 51.27 16.67 12,700.00 15.19 75.98 176.50 7,276.94 14.89 51.27 16.62 12,800.00 17.35 78.67 176.32 7,298.88 15.05 51.22 16.50 12,832.41 19.47 79.55 176.12 7,305.00 15.22 51.10 16.33 Alpine C/UJU 12,900.00 19.47 81.39 176.12 7,316.19 15.22 51.10 16.33 13,000.00 21.56 84.11 175.90 7,328.82 15.39 50.93 16.14 13,100.00 23.59 86.85 175.67 7,336.70 15.55 50.69 15.93 13,105.62 23.70 87.00 175.66 7,337.00 15.56 50.67 15.92 Hold for 95.54'-Alpine A-CD5-09 01.Heel 071615 JB 13,108.77 23.78 87.00 175.48 7,337.16 15.63 51.26 16.00 AW-7A NA 08Aug13 Heel 13,200.00 23.78 87.00 175.48 7,341.94 15.63 51.26 16.00 13,201.16 23.78 87.00 175.48 7,342.00 15.63 51.27 16.00 Adjust TF to 0°,for 20'-7-5/8"x 9-7/8"by 11" 13,221.16 23.78 87.00 175.41 7,343.05 15.63 51.41 16.01 Start 4°/100'DLS,0°TF,for 93.87' 10/1/2015 2:55:21PM Page 6 COMPASS 5000.1 Build 74 • Schlumberger • Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (°) (°) (usft) (usft) (usft) (usft) 13,300.00 24.05 90.15 175.17 7,345.00 15.64 51.98 15.62 13,315.03 24.09 90.75 175.12 7,344.89 15.64 52.10 15.55 Hold for 7049.52' 13,400.00 24.09 90.75 174.83 7,343.77 15.65 52.75 15.57 13,500.00 24.10 90.75 174.49 7,342.45 15.68 53.55 15.59 13,600.00 24.10 90.75 174.12 7,341.13 15.71 54.39 15.63 13,700.00 24.10 90.75 173.75 7,339.81 15.75 55.26 15.67 13,800.00 24.11 90.75 173.37 7,338.50 15.81 56.16 15.72 13,900.00 24.11 90.75 172.98 7,337.18 15.86 57.09 15.78 14,000.00 24.11 90.75 172.58 7,335.86 15.93 58.05 15.85 14,100.00 24.12 90.75 172.19 7,334.54 16.01 59.04 15.92 14,200.00 24.12 90.75 171.78 7,333.23 16.09 60.06 16.01 14,300.00 24.12 90.75 171.38 7,331.91 16.18 61.10 16.10 14,400.00 24.13 90.75 170.98 7,330.59 16.28 62.17 16.20 14,500.00 24.13 90.75 170.59 7,329.28 16.39 63.25 16.31 14,600.00 24.13 90.75 170.19 7,327.96 16.50 64.36 16.42 14,700.00 24.14 90.75 169.80 7,326.64 16.62 65.49 16.54 14,800.00 24.14 90.75 173.81 7,325.32 15.90 55.00 15.82 14,900.00 24.14 90.75 173.68 7,324.01 15.94 55.29 15.85 15,000.00 24.15 90.75 173.55 7,322.69 15.97 55.58 15.89 15,100.00 24.15 90.75 173.42 7,321.37 16.01 55.88 15.93 15,200.00 24.16 90.75 173.28 7,320.05 16.05 56.18 15.97 15,300.00 24.16 90.75 173.15 7,318.74 16.09 56.49 16.01 15,400.00 24.16 90.75 173.01 7,317.42 16.14 56.80 16.05 15,500.00 24.17 90.75 172.87 7,316.10 16.18 57.12 16.10 15,600.00 24.17 90.75 172.73 7,314.78 16.23 57.44 16.15 15,700.00 24.17 90.75 172.59 7,313.47 16.28 57.76 16.20 15,800.00 24.18 90.75 172.45 7,312.15 16.33 58.09 16.25 15,900.00 24.18 90.75 172.31 7,310.83 16.38 58.42 16.30 16,000.00 24.18 90.75 172.17 7,309.52 16.44 58.76 16.36 16,100.00 24.19 90.75 172.03 7,308.20 16.49 59.10 16.41 16,200.00 24.19 90.75 171.88 7,306.88 16.55 59.44 16.47 16,300.00 24.20 90.75 171.74 7,305.56 16.61 59.79 16.53 16,400.00 24.20 90.75 171.60 7,304.25 16.67 60.14 16.59 16,500.00 24.20 90.75 171.45 7,302.93 16.74 60.50 16.66 16,600.00 24.21 90.75 171.31 7,301.61 16.80 60.85 16.72 16,700.00 24.21 90.75 171.16 7,300.29 16.87 61.22 16.79 16,800.00 24.22 90.75 171.02 7,298.98 16.94 61.58 16.86 16,900.00 24.22 90.75 170.87 7,297.66 17.01 61.95 16.93 17,000.00 24.22 90.75 170.73 7,296.34 17.08 62.32 17.00 17,100.00 24.23 90.75 170.58 7,295.02 17.15 62.69 17.07 17,200.00 24.23 90.75 170.44 7,293.71 17.23 63.07 17.15 17,300.00 24.24 90.75 170.29 7,292.39 17.30 63.45 17.23 17,400.00 24.24 90.75 170.15 7,291.07 17.38 63.83 17.30 17,500.00 24.24 90.75 170.01 7,289.76 17.46 64.22 17.38 10/1/2015 2:55:21PM Page 7 COMPASS 5000.1 Build 74 • Schlumberger • Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope ND Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Planned Survey MD MD Error Inc Ellipse Inc TVDSS Vert.Error Lat.Error Horz.Error (usft) (usft) (0) (0) (usft) (usft) (usft) (usft) 17,600.00 24.25 90.75 169.86 7,288.44 17.54 64.61 17.46 17,700.00 24.25 90.75 169.72 7,287.12 17.62 65.00 17.55 17,800.00 24.26 90.75 169.58 7,285.80 17.71 65.40 17.63 17,900.00 24.26 90.75 169.44 7,284.49 17.79 65.79 17.72 18,000.00 24.27 90.75 169.29 7,283.17 17.88 66.19 17.80 18,100.00 24.27 90.75 169.15 7,281.85 17.97 66.60 17.89 18,200.00 24.27 90.75 169.01 7,280.53 18.06 67.00 17.98 18,300.00 24.28 90.75 168.87 7,279.22 18.15 67.41 18.07 18,400.00 24.28 90.75 168.74 7,277.90 18.24 67.82 18.16 18,500.00 24.29 90.75 168.60 7,276.58 18.33 68.23 18.26 18,600.00 24.29 90.75 168.46 7,275.26 18.42 68.65 18.35 18,700.00 24.30 90.75 168.32 7,273.95 18.52 69.07 18.45 18,800.00 24.30 90.75 168.19 7,272.63 18.62 69.49 18.54 18,900.00 24.30 90.75 168.05 7,271.31 18.72 69.91 18.64 19,000.00 24.31 90.75 167.92 7,270.00 18.81 70.33 18.74 19,100.00 24.31 90.75 167.79 7,268.68 18.91 70.76 18.84 19,200.00 24.32 90.75 167.65 7,267.36 19.02 71.19 18.95 19,300.00 24.32 90.75 167.52 7,266.04 19.12 71.62 19.05 19,400.00 24.33 90.75 167.39 7,264.73 19.22 72.06 19.15 19,500.00 24.33 90.75 167.26 7,263.41 19.33 72.49 19.26 19,600.00 24.34 90.75 167.13 7,262.09 19.43 72.93 19.36 19,700.00 24.34 90.75 167.01 7,260.77 19.54 73.37 19.47 19,800.00 24.35 90.75 166.88 7,259.46 19.65 73.81 19.58 19,900.00 24.35 90.75 166.76 7,258.14 19.76 74.25 19.69 20,000.00 24.35 90.75 166.63 7,256.82 19.87 74.70 19.80 20,100.00 24.36 90.75 166.51 7,255.51 19.98 75.14 19.91 20,200.00 24.36 90.75 166.39 7,254.19 20.09 75.59 20.02 20,300.00 24.37 90.75 166.26 7,252.87 20.20 76.04 20.14 20,363.76 24.37 90.75 166.19 7,252.03 20.28 76.33 20.21 AW-7A NA 08Aug13 Toe 20,364.55 24.37 90.75 166.19 7,252.02 20.28 76.33 20.21 TD:20364.55'MD,7322.52'ND-4-1/2"x 6-1/2"-CD5-09 02.Toe 071615 JB 10/1/2015 2:55:21PM Page 8 COMPASS 5000.1 Build 74 • Schlumberger • Error Ellipse Report Company: ConocoPhillips(Alaska)Inc.-WNS Local Co-ordinate Reference: Well Plan:CD5-09 Project: Western North Slope TVD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Site: CD5 Alpine West Pad MD Reference: Plan:34.2+36.3 @ 70.50usft(Doyon 19) Well: Plan:CD5-09 North Reference: True Wellbore: Plan:CD5-09 Survey Calculation Method: Minimum Curvature Design: CD5-09wp09 Database: OAKEDMP2 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (") (') 110.00 110.00 20"x 42" 20 42 2,444.61 2,165.50 10-3/4"x 13-1/2" 10-3/4 13-1/2 13,201.16 7,412.50 7-5/8"x 9-7/8"by 11" 7-5/8 11 20,364.55 7,322.52 4-1/2"x 6-1/2" 4-1/2 6-1/2 Formations Measured Vertical Dip Depth Depth Dip Direction (usft) (usft) Name Lithology (°) (°) 13,105.62 7,407.50 Alpine A 5,925.62 3,953.50 K-2 Qannik 5,871.11 3,925.50 K3 Basal 12,483.54 7,284.50 LCU 2,756.11 2,325.50 C-30 8,723.29 5,390.50 Albian 96 12,832.41 7,375.50 Alpine C/UJU 11,828.56 6,985.50 HRZ Top 12,477.65 7,282.50 Kuparuk C 12,186.33 7,165.50 HRZ Base/Top Kalubik 1,373.45 1,350.50 Base Permafrost 5,520.67 3,745.50 K-3 12,253.42 7,195.50 K-1 /Lower Kalubik 6,026.86 4,005.50 K2 Basal 6,610.92 4,305.50 Albian 97 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 385.00 385.00 0.00 0.00 KOP:Start 1.5°/100'DLS,340°TF,for 215.11' 600.11 600.00 5.69 -2.07 Start 2.5°/100'DLS,0°TF,for 719.7' 1,319.82 1,300.50 148.29 -53.97 Hold for 107.27' 1,427.09 1,400.50 184.77 -67.25 Start 3.87°/100'DLS,24.6°TF,for 1014.28' 2,441.36 2,163.84 817.01 -149.37 Hold for 9602.23' 12,043.59 7,095.95 9,050.12 -454.19 Start 3.5°/100'DLS,-46.48°TF,for 1062.03' 13,105.62 7,407.50 10,006.80 -730.96 Hold for 95.54' 13,201.16 7,412.50 10,090.92 -775.97 Adjust TF to 0°,for 20' 13,221.16 7,413.55 10,108.53 -785.39 Start 4°/100'DLS,0°TF,for 93.87' 13,315.03 7,415.39 10,191.27 -829.65 Hold for 7049.52' 20,364.55 7,322.52 16,406.72 -4,154.61 TD:20364.55'MD,7322.52'TVD Checked By: Approved By: Date: 10/1/2015 2:55:21PM Page 9 COMPASS 5000.1 Build 74 Pool Report 0 • S:4H�October O1 2015 WELLBORE TARGET DETAILS(MAP CO-ORDINATES) 1CD5-09w1309 Name AneI071615JB x.50 Clrtle(Radius:10000.00)0) C05-0902.Too 071615 JB 7322.52 Circle(Radius:100.00) Quarter Mile View AW-7A NA 08Aug13 Heel 7487.81 Circle(Radius:100.00) CDN-0 N1 OeoI 071 T 7407.50 Circle(Radius:100.00) CD5-009 Cede 7407.50 Circle(Radius:1320.00) CO5-09 02.Tce 077815 n Chole 7322.52.00Circle(Radius:1337.00) CD5-09 BauMingPotygon 072715 BP 0.00 Potygsn 01 • P09 C0.01 49 18000 zoS- —— - —i 1 1. i.01 1 °�� G�� C0�.1ry`N-- \ 16000 \\ u) 84000 N _C t O 42000 - \ \ L 7 W 10000 A14. • 1ee5A4 • • • CO 8000 -- •- COy' • i II -10000 -8000 -6000 -4000 -2000 0 2000 4000 6000 West(-1/East(+1 (2000 usft/inl • CD5-09wp09 3-D View CD5-09wp0 • CD5-03wp08. Toe • ..x • CD5-06wp0 ....--..... '. • • CDS-12wp0 • • • 4 • • CD5 0', CD5-07wp0 ' '- CD5-10wp0 CD5-99wp0• • • CD5-09wp09 3-D View • • • Top - CD5-09w00 CD5-12wp0 •••CD5-99w • CD5-10wP0 CD5-06wp0 CD5-01wp0 K p0 CD5-03wp08. CD5-02wp0 • • CD5-09wp09 3-D View intli MC MK-1/Lnwa.,Ciiift Z CD5-99wp0 CD5-10wpO -- CD5-07wp0 • • CD5-09wp09 3-D View Tn CDS 12 p CD5-09wp0 CD5-06Wp0 CD5-03wp08. I • I CD5-09wp09 Surface Location CPA!Coordinate Converter ,.....J+ From: ------ To: Datum: �NAD83 Region: Ialaska Datum: INAD27 Region: alaska • __ Latitude/Longitude 'Decimal Degrees J ( Latitude/Longitude 'Decimal Degrees U TM Zone: r South t'''' U T h4 Zone: 1-- 'True C— South State Plane Zone: 4 Units: us-ft . I r' State Plane Zone: 4 Units: just r Legal Description(NAD27 only) C Legal Description(NAD27 only) Starting Coordinates: Ending Coordinates: -- X: 11489418.53 } X: 349385.383565428 Y: 5965618.27 1 Y: 15965872.30583796 I Transform Quit I Help i CD5-09wp09 Intermediate Casing CZ CPA!Coordinate Converter 0 X. From To: Datum: INAD83 Region: Ialaska ....., Datum: (NAD27 Region: lalaska j Latitude/Longitude [Decimal Degrees C Latitude/Longitude [Decimal Degrees •I UTM Zone: r---- E South r UTM Zone: True t` South ,.; State Plane Zone: 4 Units: us-ft • State Plane Zone: 4 J Units: us•ft ,_. Legal Description(NAD27 only) r Legal Description(NAD27 only) Starting Coordinates: Ending Coordinates: X: 11488845.70 X: X348812.957779497 Y: 15975722.01 Y: 15975976.12890106 �����Transform ��� Quit I Help • • CD5-09wp09 TD l . CPA!Coordinate Converters " .[ a X ,ter... From: _ __ _ To: Datum: INAD83 Region: Ialaska A Datum: [NAD27 Region: Ialaska j C' Latitude/Longitude 'Decimal Degrees A r Latitude/LongitudeIDecimal Degrees �.. ,°` UTM Zone: I E South r UTM Zone: True 1— South State Plane Zone: 4 Units: u t r: State Plane Zone: 4 Units: us•ft Legal Description(NAD27 only) 1 1 C Legal Description(NAD27 only) li Starting Coordinates: Ending Coordinates: X: (1485595 X: } 345562.461615047 Y: (5982104 [_, Y: 1 5982358.25882906 Transform Quit I Help • • CD5-09wp09 Surface Location tn CPAI Coordinate EJ From: _.. _ To: Datum: 1NA083 •j Region: lalaska ." Datum: JNAD27 Region: lalaska C` Latitude/Longitude 'Decimal Degrees r- LatitudelLongitude [Decimal Degrees .2J r UTM Zone: [® E South f__ UTM Zone: True E South t- State Plane Zone: 4 j Units: L17;:it—cl ( State Plane Zone: ittr—1 Units: us•ft �' <+ Legal Description(NAD27 only) Starting Coordinates: Legal Description X: 11489418.53Township: 011 N Range: 004 E -71 Y: 15965618.27 Meridian: lu J Section:11$ 1-0-NL E 1339.10683 1 TE—L—E 12593.1697 Transform Quit Help 10 CD5-09wp09 Intermediate Casing CI CPAI Coordinate Con Q__ X From: To: Datum: 1NA083 Region: lalaska 2 ; Datum: 1NA027 _.I Region: lalaska •I '`" Latitude/Longitude 'Decimal Degrees Lvl C Latitude/Longitude 'Decimal Degrees r" UTM Zone: r--- ^ E South C UTM Zone: True E South 01 State Plane Zone: 4 Units: us.ft f State Plane Zone: 4 Units: us ft .' Ler ai _ option INA() -xr; l is Legal Description(NAD27 only) L_ _. _ _ _ f:-Starting Coordinates:- Legal Description X: 11488845.70 Township: 1011 N Range: 004 E Y: 15975722.01 Meridian: IuSection:18 FNL 1808.05856 [FEL • 13329.2625 Transform 1 Quit I Help ID • 1 CD5-09wp09 TD - . . tt CPA!Coordinate Convettei. ''''',.'L 1.'"' -.3`i'-i- -''I -• - From To: Datum: 1NA083 ,i, Region. jalaska 2L1 Datum: jNAD27 .. Region: lalaska -.1 Latitude/Longitude 'Decimal Degrees .. ( Latitude/Longitude Decimal Degrees ....' UTM Zone: E E South r* UTM Zone: TrtiTe E South ri' State Plane Zone: F47.1 Units: LF.ii ( State Plane Zone: 171----;.1 Units: us.F.TE, (;" Legal Description(NAD27 only) Starting Coordinates: Legal Description X: 11485595 Township: 10r1--- 2 [Ii- Range: 1---- 003 In. Y: 15982104 Meridian: lu . Section:125 IFITICE 15053.0399 ITEC--;1 11822.2496 Transform —1 Quit I Help I fit As - built REV DATE BY CK APP • DESCRIPTION REV DATE BY APP DESCRIPTION 1 ##/##/15 CZ DB C.A. UPDATED PER K150003ACS ALPINE SATELLITE DEVELOPMENT -0 ��11�' LOCATION Fr . �, g THIS SURVEYEY p ���,.� CD4 TO ALPINE 1 .' �, 4,A CD5 • ° ACCESS ROAD , '�� �° c ,5-O.) f -°-.d., �li 'r, cr Ilk 4-1‘ ` rn� PROif 11 ' .. ��UM% � � - - VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. CD-5 NOU`DER OF PPD o0 �i PAD DES\c' 5 ��oa nGGG .,;(5\N • ooAA?*xX>;N�oi:: • T1 � �• * p, 'CI N1iO 0000t - .� iii -1100 '• • Q� PLANT N ASPC N a 15.41 52" Q 01 _ 7-)\-8 KUUKPIK I Z 4001- LCMFU. rn MLWM � A �/YYO11A bbe wnw lso:l e<ras Alpine Survey Office 1110"7 ALPINE MODULE:LD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 14-12-09-1C ##/##/15 CE—CD50—### 1 OF 3 1 REV DATE BY CK APP • DESCRIPTION REV DATE BY APP DESCRIPTION 1 #0#/15 CZ DB C.A. UPDATED PER K150003ACS ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. SEC.LINE 0/S EXIST. WELL 'Y' 'X' LAT.(N) LONG.(W) FNL FWL GND PAD CD5-x01 5,965,661.64 1,489,572.44 70° 18' 49.155" 151' 13' 21.378" 293' 2489' 27.6 34.1 CD5-x02 5,965,656.28 1,489,553.29 70' 18' 49.099" 151' 13' 21.934" 299' 2470' 28.1 34.1 CD5-x03 5,965,650.92 1,489,534.00 70° 18' 49.042" 151° 13' 22.493" 305' 2451' 28.4 34.1 CD5-x04 5,965,645.24 1,489,514.77 70° 18' 48.982" 151' 13' 23.051" 311' 2432' 26.6 34.2 CD5-x05 5,965,639.80 1,489,495.46 70' 18' 48.925" 151' 13' 23.611" 316' 2412' 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70° 18' 48.870" 151' 13' 24.170" 322' 2393' 27.7 34.3 CD5-x07 5,965,629.08 1,489,457.08 70° 18' 48.812" 151° 13' 24.724" 328' 2374' 27.9 34.3 CD5-x08 5,965,623.88 1,489,437.69 70' 18' 48.757" 151' 13' 25.287" 334' , 2355' 28.1 34.3 CD5-x09 5,965,618.27 1,489,418.53 70' 18' 48.698" 151' 13' 25.842" 340' 2336' 27.3 34.2 CD5-x10 5,965,613.12 1,489,399.13 70' 18' 48.644" 151' 13' 26.405" 345' 2317' 28.1 34.1 CD5-x11 5,965,607.66 1,489,379.86 70' 18' 48.586" 151° 13' 26.964" 351' 2297' 27.9 34.1 CD5-x12 5,965,602.23 1,489,360.56 70' 18' 48.529" 151' 13' 27.524" 357' 2278' 28.0 34.1 CD5-x13 5,965,596.59 1,489,341.43 70' 18' 48.470" 151' 13' 28.079" 363' 2259' 26.1 34.2 CD5-x14 5,965,591.36 1,489,322.33 70° 18' 48.414" 151' 13' 28.633" 368' 2240' 27.6 34.2 CD5-x15 5,965,586.10 1,489,303.11 70' 18' 48.359" 151' 13' 29.190" 373' 2221' 26.8 34.2 NOTES: KUUKPIK 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. fIk . II.CMF2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) ,,.h„ bb dnm I9�l osr5 Alpine Survey Office ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 14-12-09-1C ##/##/15 CE-CD50-### 1 OF 3 1 REV DATE BY CK APP • DESCRIPTION REV DATE BY S APP DESCRIPTION 1 #005 CZ DB C.A. UPDATED PER K150003ACS NOTES: 1 . ALL COORDINATES SHOWN ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL. ORIGINAL GROUND ELEVATIONS WERE DERIVED FROM THE AVERAGE ELEVATION ALONG THE TOE OF THE CD-4 GRAVEL PAD. 3. BASIS OF COORDINATES: ALPINE PERMANENT CONTROL MONUMENTS PER SURVEY BY KUUKPIK/LCMF, JUNE 2013. 4. DATES OF AS-BUILT SURVEYS: WELL CONDUCTORS CD5-X12, CD5-X13, CD5-X14, CD5-X15, 4/10/15, FB 2015-12 PGS 4-7, 9; CD5-X01 THRU CD5-X11, 4/17/15, FB 2015-10 PGS 49-52; SURVEYOR'S CERTIFICATE I HEREBY CERTIFY THAT I AM PROPERLY REGISTERED AND LICENSED 40,1b. .• OFq� S „♦ AS-O BUILTI E LAND REPRESENTS R AEYING IN THE SURVEY MADE BYEOF MEE ORLASKA, THAT THIS • UNDER MY DIRECT • �'�•''•• •••'.� �1 SUPERVISION, THAT THE MONUMENTS SHOWN HEREON ACTUALLY EXIST ••' �1 AS DESCRIBED, AND THAT ALL DIMENSIONS AND OTHER DETAILS ARE *'•49th * • CORRECT. % • Häagen Dazs Necessary Plan Request (NPR) • ! Initiated by: Justine Boccanera Date: 07/16/15 Contact Information: 907-263-4236 Need by: 07/17/15 Friday for Event: FEL3 Well Name:CD5-09 Placeholder Well Name: Bottom Hole Location Name Last Plan Number(prior to this change request):wp 08 As-built available?Yes As-built attached? No Slot/Surface Location: 9 Y/N: 5965618.27 X/E: 1489418.53 Z: 34.20 NAD: 83 Rig:Doyon 19 Doyon 19 Air Gap: 36.3 RKB: 70.5 Inclination Profile:Horizontal Pilot Hole?: No Laterals?: Single New Hole from:Surface ii Number of Hole Sections: 3 Strings 111111 c 101 20 X 42 110.00 TVD Formations Depths M-Motor Base Permafrost 1280.00 rvoss Max Dogleg: C-30 2255.00 Noss 3.0 - Limit Steering in this Hole Section?: No Il K-3 3675.00 TVDSS K3 Basal 3855.00 rvoss s u K-2 Qannik 3883.00 rvoss r K2 Basal 3935.00 rvoss ',,,,,,p,,,, Albian 97 4235.00 TVDSS ''W' Albian 96 5320.00 rvoss HRZ Top 6915.00 TVDSS I 10 3/4 x 13 v2 2095 TVDSS iiiiiBase/Top Kalubik 7095.00 wowiiii K-1/Lower Kalubik 7125.00 rvoss KuparukC 7212.00 Tvoss .LII Ili: LCU 7214.00 rvoss hill. 111111 Alpine C/UJU 7305.00 TVDSS liiill 111111 inn; 111111 Alpine A 7337.00 Tvoss Alpine A Base 7357.00 TVDSS iiNt 111111 RS-Rotary' 111111 Pump Tangent: No illiii Max Dogleg: Hull 10 Limit Steering in this Hole Section?: No 11111 iE I II Top of Pool/Production Interval: ll Alpine A 7337.00 Tvoss1111111 Milli illii Bottom of Pool/Production Interval: 111111111111 Alpine A 7357.00 TVDSS j;! illill 7 5/8 x Other 7342 TVDSS 87° Targets V/North X/East Z/Depth ./-Radius Inc° I RS-Rotary j 3-7/8"x11' Heel Location 5975636.94 1488889.03 7337.00 TVDSS los ft 84 ° I Max Dogleg: 3.0 Horizontal By: 7347 rvoss 90° Lineup with Toe at Heel? Yes Bottom Hardline: Alpine A Base 7357 rvoss 90° 1 i i 4 1/2 x Other _ 6-1/2 Geology/Reservoir Contacts:Justine Boccanera Drilling/Completion Contacts:Will Earhart Well Planning Contacts:First&Last Name(s) 16July2015: Formation tops revised in response to CD5-04&CD5- Updated casing design 313PB1 drilling results. Also the need to be at 84 degrees inclination at top Alpine A. Update landing inclination at intermediate shoe to 87deg Approved by: Will Earhart Date: 07/16/15 Contact Information: 907-265-1077 Mg end -,1•LiritoAtiviiii aik %cill q, PROPOSED WELLS Qet.:- ,CPAI OPERATED UNIT Operator 0 %ADL388466- L CPAI LEASE with ADL#, and Filet 0 0 A:,', 300634 0 4 o-` o Q� b b COL ILLE 'v `: RIVED UNIT ASRC-NP -1 ASRC-NPR2 ASRC-NP I ASRC-NPR 0Q i 0CQs TO ° ADL387207 S � CA ?932191 :71 581 NfPR - A CD _ 0, 0-N .. , i.; 0 0 b AA092347 SRC-NP'- Q Q Qt3` 340758 • O ._._.�- --,. B -; W c.3` . .----f _. 1 `N., j` DL380075 - , 32034 A', -NPR2 DL380077 2036 1 AA09234ADL38720 340757 d 932193 D ASRC- PR4 ConocoPhiflips (,".1 (1).' ' Alaska, Inc. .Q Proposed CD5 Wells With ___ N Leases 3-19-2015 AA081817', 0 0.5 1 932552 A Miles • Loepp, Victoria T (DOA) From: Bettis, Patricia K(DOA) Sent: Wednesday, October 28, 2015 8:52 AM To: Loepp, Victoria T (DOA) Subject: RE: CRU CD5-09(PTD 215-177) Diverter Waiver Follow-Up From: Loepp,Victoria T(DOA) Sent:Tuesday, October 27, 2015 1:56 PM To: Bettis, Patricia K (DOA)<patricia.bettis@alaska.gov> Subject: FW: CRU CD5-09(PTD 215-177) Diverter Waiver Follow-Up Patricia, Do you recommend approval of the diverter waiver? Thanx, Victoria From: Earhart, Will C [rnailto:William.C.Earhart@conocophillips.com] Sent: Tuesday, October 27, 2015 1:53 PM To: Loepp, Victoria T(DOA) Subject: RE: CRU CD5-09(PTD 215-177) Diverter Waiver Follow-Up Victoria, We completed the surface section on CD5-03 last week and are now drilling the intermediate.We did not see any gas while drilling,tripping, casing or cementing. Upon drill out,the shoe was tested to a LOT of 17.2ppg. In regards to the diverter waiver for CD5-09, is there any additional information that you need from ConocoPhillips? Thanks Will Will Earhart Drilling Engineer-ConocoPhillips Alaska,Inc William.C.Earhart@conocophillips.com ATO-1706 Office:+1.907.265.1077 Mobile:+1.540.448.1789 From: Loepp, Victoria T(DOA) [nailto:victoria.loepp@lalaska.gov] Sent: Tuesday, October 20, 2015 2:11 PM To: Earhart, Will C Subject: [EXTERNAL]RE: CRU CD5-09(PTD 215-177) Diverter Waiver Follow-Up Will, We will revisit after the surface hole of CD5-03 is drilled. 1 • • Thanx, Victoria From: Earhart, Will C f mailto:William.C.Earhart@conocophillips.com] Sent: Tuesday, October 20, 2015 11:11 AM To: Loepp, Victoria T(DOA) Subject: CRU CD5-09(PTD 215-177) Diverter Waiver Follow-Up Victoria, Per our conversation earlier in regards to the diverter waiver request on well CRU CD5-09, please find an anti-collision plot that illustrates that well CRU CD5-03 will be within 250ft at the surface casing shoe depth. The plot depicts a 500ft radius from 2400-2500ft MD (centered on CD5-09).The surface casing shoe set depth of CD5-09 is planned for 2,445ft MD. CRU CD5-03 was spud yesterday.The actual spacing will differ slightly compared to the planned well path but will still be well within the 500ft threshold. Please let me know if you have any questions. Thanks Will Will Earhart Drilling Engineer-ConocoPhillips Alaska,Inc William.C.Earharta(�conocophillips.com ATO-1706 Office:+1.907.265.1077 Mobile:+1.540.448.1789 2 • • Loepp, Victoria T (DOA) From: Loepp,Victoria T(DOA) Sent: Tuesday, October 13, 2015 2:12 PM To: 'sara.heskin@cop.com' Subject: CRU CD5-09(PTD 215-177) Diverter Route Schematic Sara, The request for a diverter waiver for this well is denied. Please submit the diverter schematic as well as a schematic of the diverter route showing a 75' radius zone around the diverter outlet. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil&Gas Conservation Commission 333 W.7th Ave Anchorage,AK 99501 Work: (907)793-1247 Victoria.LoeopC ialaska.gov CONFIDENTIALITY NOTICE:This e-mail message,including any attachments,contains information from the Alaska Oil and Gas Conservation Commission(AOGCC),State of Alaska and is for the sole use of the intended recipient(s).It may contain confidential and/or privileged information.The unauthorized review,use or disclosure of such information may violate state or federal law.If you are an unintended recipient of this e-mail,please delete it,without first saving or forwarding it,and,so that the AOGCC is aware of the mistake in sending it to you,contact Victoria Loepp at(907)793-1247 or Victoria.Loem@alaska.gov 1 • • OVERSIZED DOCUMENT INSERT This file contains one or more oversized documents. These materials may be found in the original hard file or check the parent folder to view it in digital format. S • TRANSMITTAL LETTER CHECKLIST WELL NAME: G Lc CJS - o q PTD: 02/E- l? /Development Service _Exploratory Stratigraphic Test Non-Conventional FIELD: TIt/4 ilk.i 1 V4J"- POOL: c /%JI/k 2A-VeAr) Atps )1 ®� Check Box for Appropriate Letter/Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - ) from records, data and logs acquired for well (name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10'sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non-Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a)authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application,the following well logs are also required for this well: Well Logging Requirements 7Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 40 • ❑❑ OD O a) a N oy, coo @ m. a 5 c a 75 c CD CO � DiQ . 0 )d , E o, , 3 ') c , .� , o. O , ° L pay a In w M. Q, O w, z. m E . co 3. ° a rn a a 'c , o L, a 0, Z 3, t, Fy c. a> c. ° 3, a). o r o v, , °i. r, o w. a 3 O. X O, 'p D LL. 0, C. a) w U Z o g. .N @ 3. O m, of M. a Q, i, D0 C y_. 01, C, 0, W U. W f) . y a , M . W ' a z_' m - Cas. V, a), ' m' E' N. ..0+. O 0. 0, - a. ti 0. , w, N. 3 $ 0 ) °� V. U) m 3. co cry CO -41 coWEEm m ° ' aUm cwc o 0 3 ,o . ca ' 0OC ° octi E aZ . uS. J' m' m' �� 'O, °. X. >, y , 'N >• m N. co. o, 0 w �. 'I CO C9 J M' M' C 0' N' U tA' O N 0 ) N 0 N z0 w . 0, Q, 0 N "' > W , OOH. CA C. >� @, d. N N' Kr ,n .°, C. w L, U, U. U. U. �, m, �' , a. i, Q. o. g, M. _. =. w1- EO , j w , U) (0 N, m V) 41)), VA 0 tl) tl) N. tl) C7) U) (4) , U). '4)). ' '4)), nN, (n a) 8 p), 8 y. 0, a z' >, >- >- >- >- > >- >- �, >- >- >- z' z' z' z; �; .1))' - >- z; z; >- > z' > > >- >- >- >- > >- z Z, >- z' z' z' >, a) N �� 0 �. E. 3. , E. m. V. °. c Z. . , I O U 'N O. o. ._ o , -° 3 C) Z O. a). r)' 0. y. 0. o La 1 13 J , 0. a a -0, O. Q' cy c ,,_ C. a O) co C. a).ccy 0 O o w 3, .: o m. a o M (1) U N N.c c o, N. , 3. a �. m co co U L. Of i. �� CO 7. 3. Oi 0• U) c O) L. C' y. 5. 0. w+ U) a' Q' u)' or a)' N w Z '0 O c a' O' 0. .coC, •O, m. N. `O, ) ° 0. m. O• O O) a)' a' L. C C' a' C' ppb 'III = a). E' M. m. a) �o M, c. c •>, �, C. o d. co. 0, LL.. N, L o( a N, L Q I co c E. E �. c, E' c`, �. �. �, 3. o N �, ' m. d ti c Co m. o y y' > o a`i °. ., c C °° m. c-, n' o O Q, S. 0 c -0 U '4 0 c y _ o. 0' a . . co. 3 > m, Y `m N m a' o, m. • ' C, T o, ° ° a m, m °, Y °, ° ° o °) o' E, m' CO CO' Q' ,' .n' CO I>. °' CD ° N c O g • ' E' a °' 0 .0 a o' o' 0' c' - Z' o' = E' °' ' 3 0' o TY L m, 3, =' a) U Q ' $-•') c' o m m. °, m. �. -. -. �, m m v E, ami, m ( c, c; a) y. °, L 0 ° y. o a 3, o •- O, 'j 3, m E m, c m a c, a m' ,, „, m. m 0, ° m. y. �. m' m' a) o w o o CO , 'a _0, c, 21 m, '@, y, v. m 3, 3. >, �. �. .. o .3 6. -a. • o' c. co. a°i o' 0, a =,O. 5. m. o, 3. o L. Z, 4-, /� O O. C. cam, �. -, >. O, •a).. a V, •O. O' m 'E, 0 c. O a). O• o. C 6 0,, 0 cry 'p• E, 2 m E' t O CO' C' a �' C C .�.: a ami a m' v' 0 a`) CO. a, �. o 3. C. a o v' ° o a o' m' m' Y' v' o a) .o EV co o . to :. D. c. O v) o a = cL.) co E, ca o o t, CD 0, co c. m A- c, m co a •m m m m. rn m o -, 0, T c. 0 3, S, c, 2, ° m o, -C' `' a m m c_ m m c ' co y �' •� o' m' @ ° 3 F c' v' el TD a a �. m, a) a). 3. o) c c or v ay c. m �, , ° o. a). a) >, " E it O m .°D, -, v. -o. -o' 'a 'g c m a. -. a. v. -. a°). • y, vs a), a), >. .0 3 L. 4, y n co, "-7- °• °. a, c. T. c E. -�> U 0. 0. m. m. c. v CO ° m , 3. :° o, N c o c, a). c. O 0. co co 0 co 0' 0. E. m. 3 ° c' o `a) co' CO a)' .-? v a E c. �, m. N 0 °. c �" Z C 3' U U U C O O w ° tq C'. >c, V. a), O, O, @ V. m. , v1. Or E 0 •C ° V. v. N O a) ° ° ° a) m m, m, • '=' a ° a), ° ° > > 3 m c c ° a). °o w. w, a) 3 0), m' d 'E a) Is° ai J U E cow' Q c3 a>), 02, a`) E. E, . -, ° c, c. F-' H F- ',, aoi a°i >_ c a 0_, o. L ( ,_, co !n m c m m, a), c, m a) a) =. V a a 0, a), m m �, o, o. 3. 2, 2, 2 m a. co -o •v' = O, O. L, °' ° a) a) m, a). a), 0, 0 0. ca, _1, D, u) -, 00, aaU; �' Q, az, U, co, U, U, UU a, w; Q - o, m, m, U �, 2,, 2 a., o. mwo,, W1a 0 N M Cn O co o) O N CO V' C° CO P CO 0) 0 N M 111 CD h CO 0) _''' p N M in co N. co 0) _ A- NN N N N N N N N N CO CO CO C) CO CO CO M M () 6 cy 2, O C a0+ ON .a.) N .0. N U O _4 O p �° 0) co cso m 0 o 0 W a. ,- co o c o o a°i E E P J N N 0 O O 0 E •E ° m 0 W o v < a c O. a°) O. a 5. a Q w 0