Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout216-110DATA SUBMITTAL COMPLIANCE REPORT
3/13/2017
Permit to Drill 2161100 Well Name/No. KUPARUK RIV UNIT 1B-18AL2 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-61-00
MD
8568
TVD 6706 Completion Date
12/14/2017 Completion Status
1 -OIL Current Status 1 -OIL UIC No
REQUIRED
INFORMATION
Mud Log No ✓
Samples No v
Directional Survey
Yeses/
DATA
INFORMATION
Types
Electric or Other Logs Run: GR/Res
(data taken from Logs Portion of Master Well Data Maint)
Well Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval
OH /
Type
Med/Frmt
Number Name
Scale Media No Start Stop
CH Received
Comments
ED
C
27864
Digital Data
1/6/2017
Electronic File: 1B-18AL2 EOW - NAD27.pdf '
ED
C
27864
Digital Data
1/6/2017
Electronic File: 1B-18AL2 EOW - NAD27.txt "
Log
C
27864
Log Header Scans
0 0
2161100 KUPARUK RIV UNIT 1 B-18AL2 LOG
HEADERS
ED
C
27925
Digital Data
6920 8568
1/18/2017
Electronic Data Set, Filename: 113-18AL2
GAMMA RES.las
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1 B-18AL2 21VID Final Logs.cgm ,
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1B-18AL2 5MD Final Logs.cgm -
ED
C
27925
Digital Data
1/18/2017
Electronic File: 113-18AL2 5TVDSS Final"
Logs.cgm
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1B-18AL2 2MD Final Logs.pdf
ED
C
27925
Digital Data
P 1/18/2017
Electronic File: 1B-18AL2 51VID Final Logs.pdf•
ED
C
27925
Digital Data
IP 1/18/2017
Electronic File: 1B-18AL2 5TVDSS Final Logs.pdf•
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1B-18AL2 EOW - NAD27.pdf
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1B-18AL2 EOW - NAD27.txt
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1B-18AL2 Final Surveys TD -
8568.csv
ED
C
27925
Digital Data
1/18/2017
Electronic File: 1 B-18AL2 Survey Listing.txt '
ED
C
27925
Digital Data
1/18/2017
Electronic File: 16-18AL2 Surveys.txt -
ED
C
27925
Digital Data
1/18/2017
Electronic File: 113-
18AL2_25_tapescan_B H I_CTK.txt
ED
C
27925
Digital Data
1/18/2017
Electronic File: 16-
18AL2_5_tapescan_BH I_CTK.txt
AOGCC
Page 1 of 2
Monday, March 13, 2017
DATA SUBMITTAL COMPLIANCE REPORT
3/13/2017
Permit to Drill
2161100 Well Name/No. KUPARUK RIV UNIT 113-18AL2 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-61-00
MD
8568
TVD 6706 Completion Date 12/14/2017
Completion Status 1-0I1- Current Status 1 -OIL UIC No
ED
C
27925 Digital Data
1/18/2017
Electronic File: 1 B-1 8AL2_output.tap
ED
C
27925 Digital Data
1/18/2017
Electronic File: 1B-18AL2 2MD Final Logs.tif
ED
C
27925 Digital Data
1/18/2017
Electronic File: 1B-18AL2 5MD Final Logs.tif '
ED
C
27925 Digital Data
1/18/2017
Electronic File: 1B-18AL2 5TVDSS Final Logs.tif'
Log
C
27925 Log Header Scans
0 0
2161100 KUPARUK RIV UNIT 16-18AL2 LOG
HEADERS
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion Report /G Directional / Inclination Data Dy,
Production Test Informatic}h�Yy�NA Mechanical Integrity Test Informations N
Geologic Markers/Tops I Y ! Daily Operations Summary
COMPLIANCE HISTORY
Completion Date: 12/14/2017
Release Date: 9/16/2016
Description Date Comments
Comments:
Compliance
Mud Logs, Image Files, Digital Data Y /SIVA) Core Chips YA
Composite Logs, Image, Data Files % Core Photographs Y A
Cuttings Samples y/0 Laboratory Analyses Y / A
Date:
AOGCC Page 2 of 2 Monday, March 13, 2017
WE A9
BAKER
HUGHES
RECEN P1,
JAN 18 2017 PRINT DISTRIBUTION LIST
COMPANY (1laska, Inc.
WELL NAME
1B-18AL2
FIELD Prudhoe Bay Unit
COUNTY North Slope Borough
BHI DISTRICT
Alaska
Please sign and return one copy of this transmittal form to:
ConocoPhillips Alaska, Inc.
Tom Osterkamp DATA LOGGED
700 G Street. 2—/ \ /201 i
.0.K_BENDER
Anchorage, Alaska 99510
to acknowledge receipt of this data.
LOG TYPE
LOG DATE
GR - RES
December 7, 2016
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider(cDbakerhughes.com TODAYS DATE January 16, 2017
Revision
STATUS Final Replacement: No Details:
Requested by: ---
COMPANY
ADDRESS f FEDEX WILL NOT DELIVER TO P.O. BO$
PERSON ATTENTION
4
FIELD
FINAL
CD
1
CD
LOGS
LOGS
I (digital/image)
Surveys
(Final Surveys)
# OF PRINTS
# OF PKIN I S
# OF COPIES
# OF COPIES
# OF COPIE
0
V
1 !BP North Slope 0 1 0 0
EOA, PBOC, PRB-20 (Office 109)
D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 �ConocoPhillips Alaska Inc. 0 0 0
Attn: Ricky Elgaricio
,ATO 3-344
700 G Street
Anchorage, AK 99510
3 Exxon Mobil, Alaska 0 0 0
(Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
1
1
1
Attn: Makana Bender
:333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5I, DNR - Division of Oil & Gas ***
0
1
1
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential' on all material deliver to DNR
6I BP Exploration (Alaska) Inc.
1
1
1
Petrotechnical Data Center, 1,112-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE: 0
2
3
3 0 0
TOTALS FOR ALL PAGES: 0
2
3
3 0 0
21 61 10
27925
�,,-- RECEIVE!
ConocoPh i I I i ps
JAN 18 2017
AOGCC
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1 B Pad
1 B-18AL2
50-029-22472-61
Baker Hughes INTEQ //%I
Definitive Survey Report H!KlGHES
20 December, 2016
ConocoPhillips
••
BAKE
ConocoPhillips
Definitive Survey Report
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference: Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference: 1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference: 1 B-18 @ 102.00usft
Well:
113-18
North Reference: True
Wellbore:
1 B-18AL2
Survey Calculation Method: Minimum Curvature
Design:
1 B-18AL2
Database: EDM Alaska NSK Sandbox
Project
Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum: Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS)
Using Well Reference Point
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Well
IB -18
Well Position
+N/ -S 0.00 usft
Northing: 5,969,647.06 usft
Latitude:
70° 19'40.248 N
+E/ -W 0.00 usft
Easting: 550,148.90usft
Longitude:
1490 35'35.868 W
Position Uncertainty
0.00 usft
Wellhead Elevation: usft
Ground Level:
61.20 usft
Wellbore
1 B-18AL2
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
(^)
(I
(nT)
BGG M2016 10/1/2016
18.01
80.96
57,551
Design
1 B-18AL2
Audit Notes:
Version:
1.0 Phase: ACTUAL
Tie On Depth: 7,590.41
Vertical: Section:
Depth From (TVD)
+NI -S +El -W
Direction
(usft)
(usft) (usft)
(I
40.80
0.00 0.00
290.00
Survey Program
Date 12/16/2016
From
To
Survey
Survey
(usft)
(usft) Survey (Wellbore)
Tool Name Description
Start Date
End Date
469.67
6,897.50 1B-18 (1B-18)
MWD MWD - Standard
4/28/1994
4/28/1994
7,392.00
7,590.41 1B-18AL3PB1 (18-18AL3P61)
MWD MWD - Standard
11/5/2016
11/11/2016
7,610.00
8,505.30 1 B-18AL2 (1 B-18AL2)
MWD MWD - Standard
1217/2016
12/13/2016
Page 2
COMPASS 5000.1 Build 74
12120/2016 9:04:29AM
-
ConocoPhillips
FIAM
ConocoPhillips
BHUGHES
Definitive Survey Report
Company:
ConocoPhillips
(Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft
Well:
1B-18
North Reference:
True
Wellbore:
113-18AL2
Survey Calculation Method:
Minimum Curvature
Design:
113-18AL2
Database:
EDM Alaska NSK Sandbox
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+Nl-S
+E/ -W
DLS
(usft)
V)
(I
(usft)
(usft)
(usft)
Northing
(usft)
Easting
(°/100')
Section
Survey Tool Name
Y
Annotation
(ft)
(ft)
(ft)
7,590.41
67.65
148.25
6,705.52
6,603.52
-2,593.48
-238.02 5,967,052.29
549,928.24
43.82
-663.36
MWD (2)
TIP
7,610.00
70.34
139.57
6,712.56
6,610.56
-2,608.24
-227.25 5,967,037.62
549,939.11
43.57
-678.52
MWD (3)
KOP
7,641.58
84.44
144.00
6,719.44
6,617.44
-2,632.40
-208.27 5,967,013.58
549,958.25
46.69
-704.63
MWD (3)
7,670.73
93.69
151.40
6,719.91
6,617.91
-2,657.00
-192.72 5,966,989.09
549,973.96
40.62
-727.65
MWD (3)
7,700.83
100.93
160.10
6,716.08
6,614.08
-2,684.17
-180.46 5,966,962.01
549,986.40
37.41
-748.46
MWD (3)
7,730.48
97.67
172.62
6,711.27
6,609.27
-2,712.54
-173.59 5,966,933.68
549,993.46
43.09
-764.62
MWD (3)
7,760.63
94.30
184.58
6,708.11
6,606.11
-2,742.46
-172.87 5,966,903.77
549,994.38
41.00
-775.53
MWD (3)
7,790.76
89.91
196.57
6,707.00
6,605.00
-2,771.99
-178.39 5,966,874.20
549,989.06
42.34
-780.45
MWD (3)
'. 7,820.78
91.38
209.44
6,706.66
6,604.67
-2,799.57
-190.10 5,966,846.56
549,977.54
43.15
-778.88
MWD (3)
7,850.81
88.59
222.08
6,706.67
6,604.67
-2,823.88
-207.61 5,966,822.13
549,960.19
43.10
-770.74
MWD (3)
7,880.40
89.11
234.64
6,707.27
6,605.27
-2,843.50
-229.67 5,966,802.36
549,938.26
42.47
-756.71
MWD (3)
7,910.51
89.60
247.40
6,707.61
6,605.61
-2,858.06
-255.96 5,966,787.63
549,912.08
42.41
-736.99
MWD (3)
7,940.43
94.73
256.83
6,706.48
6,604.48
-2,867.23
-284.37 5,966,778.27
549,883.73
35.85
-713.43
MWD (3)
7,965.13
92.24
265.80
6,704.97
6,602.97
-2,870.95
-308.71 5,966,774.39
549,859.41
37.62
-691.83
MWD (3)
7,995.15
95.66
271.67
6,702.90
6,600.90
-2,871.61
-338.64 5,966,773.53
549,829.50
22.59
-663.93
MWD (3)
8,025.40
94.80
286.17
6,700.13
6,598.13
-2,866.95
-368.31 5,966,777.99
549,799.79
47.82
-634.45
MWD (3)
8,056.09
89.69
297.27
6,698.93
6,596.93
-2,855.62
-396.75 5,966,789.13
549,771.29
39.78
-603.86
MWD (3)
8,085.87
90.52
310.10
6,698.87
6,596.87
-2,839.14
-421.48 5,966,805.45
549,746.45
43.17
-574.98
MWD (3)
8,116.15
86.25
316.88
6,699.72
6,597.72
-2,818.32
1343.42 5,966,826.11
549,724.37
26.45
-547.25
MWD (3)
8,145.85
86.62
319.10
6,701.57
6,599.57
-2,796.30
-463.26 5,966,848.00
549,704.39
7.56
-521.07
MWD (3)
8,175.49
87.61
318.67
6,703.06
6,601.06
-2,774.00
-482.72 5,966,870.17
549,684.78
3.64
-495.15
MWD (3)
-
8,205.40
87.11
317.34
6,704.44
6,602.44
-2,751.79
-502.71 5,966,892.24
549,664.64
4.75
468.77
MWD (3)
8,235.43
90.06
318.21
6,705.18
6,603.18
-2,729.56
-522.88 5,966,914.33
549,644.32
10.24
-442.22
MWD (3)
8,265.82
92.21
317.58
6,704.58
6,602.58
-2,707.02
-543.25 5,966,936.73
549,623.80
7.37
415.36
MWD (3)
8,297.17
93.01
315.98
6,703.15
6,601.15
-2,684.20
-564.70 5,966,959.41
549,602.21
5.70
-387.41
MWD (3)
8,325.09
93.01
313.19
6,701.69
6,599.69
-2,664.63
-584.56 5,966,978.84
549,582.22
9.98
-362.06
MWD (3)
8,355.13
90.77
313.62
6,700.70
6,598.70
-2,644.00
-606.37 5,966,999.32
549,560.28
7.59
-334.50
MWD (3)
8,385.09
87.24
313.87
6,701.22
6,59922
-2,623.29
-628.00 5,967,019.88
549,538.50
11.81
-307.09
MWD (3)
8,414.21
85.42
311.97
6,703.08
6,601.08
-2,603.50
-649.28 5,967,039.53
549,517.10
9.03
-280.32
MWD (3)
8,445.45
86.13
309.74
6,705.38
6,603.38
-2,583.13
-672.85 5,967,059.75
549,493.40
7.47
-251.21
MWD (3)
12120/2016 9:04:29AM
Page 3
COMPASS 5000.1 Build 74
Annotation
ri.r
BAKER
HUGHES
12/20/2016 9:04:29AM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips (Alaska)
Inc. -Kupl
Local Co-ordinate Reference:
Well 1 B-18
Project: Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site: Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft
Well: 113-18
North Reference:
True
Wellbore: 1 B-18AL2
Survey Calculation Method:
Minimum Curvature
Design: 1 B-18AL2
Database:
EDM Alaska NSK Sandbox
Survey
Map
Map
Vertical
MD Inc Azi
TVD
TVDSS
+Nl-S
+E/.W Northing
EMap DLS
Section
Survey Tool Name
(usft) (°) (°)
(usft)
(usft)
(usft)
(usft) (ft)
(ft) (°/100')
(ft)
8,475.30 88.43 308.35
6706.80
6,604.80
-2,564.35
-696.00 5,967,078.37
549,470.12 9.00
-223.03
MWD (3)
8,505.30 90.64 307.21
6,707.04
6,605.04
-2,545.97
-719.71 5,967,096.59
549,446.29 8.29
-194.47
MWD (3)
8,568.00 90.64 307.21
6,706.34
6,604.34
-2,508.05
-769.64 5,967,134.16
549,396.11 0.00
-134.58
PROJECTED to TO
Annotation
ri.r
BAKER
HUGHES
12/20/2016 9:04:29AM Page 4 COMPASS 5000.1 Build 74
FKA FIG A ()G -
-
BAKER Date:
December 22, 2016
HUGHES
To
Makana Bender
AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska 99501
Letter of Transmittal
DATA LOGGED
/?9/201't
K. BENDER
From:
Yosha Ragbirsingh / Michael Soper
Baker Hughes INTEQ
795 East 94th Avenue
Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
1B -18A
21 6108
27
86
2
1B-18AL1
2 1 9 1 0 9
27
86
3
1 B-18AL2
1B-18AL3PB1
2 1 61 10
27
86
4
1B-18AL3
2 1 61 4 4
27
86
5
1B-18AL3-01
21 6144
27
86
6
21 61 56
27867
(6) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Michael Soper, Baker Hughes, Project Engineer
Michael. Soper@BakerHughes.com
Yosha Ragbirsingh, Baker Hughes, Survey Manager
Yosha.Ragbirsingh@BakerHughes.com
ConocoPhilli s
p
,EC jV
1AN 0 6 2017
ACGCC
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1B Pad
1 B-18AL2
50-029-22472-61
Baker Hughes INTEQ
Definitive Survey Report
20 December, 2016
21 81 1
27 85 1
Few a I
BAKER
HUGHES
ConocoPhillips
HIM
ConocoPhillips
Definitive Survey Report
HUGHES
Company: ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference: Well 1 B-18
Project: Kuparuk River Unit
TVD Reference: 1 B-1 B @ 102.00usft
Site: Kuparuk 1 B Pad
MD Reference: 1 B-18 @ 102.00usft
Well: IB-18
North Reference: True
Wellbore: 1 B-18AL2
Survey Calculation Method: Minimum Curvature
Design: 1 B-18AL2
Database: EDM Alaska NSK Sandbox
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution)
System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS)
Using Well Reference Point
Map Zone: Alaska Zone 04
Using geodetic scale factor
r
Well IB-18
Well Position +N/-S 0.00 usft
Northing: 5,969,647.06 usft
Latitude:
70° 19'40.248 N
+E/-W 0.00 usft
Easting: 550,148.90 usft
Longitude:
149° 35'35.868 W
Position Uncertainty 0.00 usft
Wellhead Elevation: usft
Ground Level:
61.20 usft
Wellbore 1 B-18AL2
Magnetics Model Name Sample Date
Declination
Dip Angle
Field Strength
(1)
(1
(nT)
BGGM2016 10/1/2016
18.01
80.96
57,551
Design 113-18AL2
Audit Notes:
Version: 1.0 Phase: ACTUAL
Tie On Depth: 7,590.41
Vertical Section: Depth From (TVD)
+N/-S +E/-W
Direction
(usft)
(usft) (usft)
V)
40.80
0.00 0.00
290.00
Survey Program Date 12/16/2016
From To
Survey
Survey
(usft) (usft) Survey (Wellbore)
Tool Name Description
Start Date
End Date
469.67 6,897.50 1B-18(1B-18)
MWD MWD-Standard
4/28/1994
4/28/1994
7,392.00 7,590.41 1B-18AL3PB1 (113-18AL3PB1)
MWD MWD- Standard
11/5/2016
11/11/2016
7,610.00 8,505.30 1 B-1 BAL2 (1 B-18AL2)
MWD MWD - Standard
12/7/2016
12/13/2016
COMPASS 5000.1 Build 74
12/20/2016 9:04:29AM
Page 2
ConocoPhillips W0aI
ConocoPhillips Definitive Survey Report HUGHES
Company:
Project:
Site:
Well:
Wellbore:
Design:
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1 B Pad
1B-18
1 B-18AL2
1 B-18AL2
Local Co-ordinate Reference:
ND Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 1 B-18
1 B-18 @ 102.00usft
1 B-18 @ 102.00usft
True
Minimum Curvature
EDM Alaska NSK Sandbox
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
DLS
(usft)
(°)
(1)
(usft)
(usft)
(usft)
(usft)
Northing
Easting
(°/100')
Section
Survey Tool Name
(ft)
(ft)
(ft)
7,590.41
67.65
148.25
6,705.52
6,603.52
-2,593.48
-238.02
5,967,052.29
549,928.24
43.82
-663.36
MWD (2)
7,610.00
70.34
139.57
6,712.56
6,610.56
-2,608.24
-227.25
5,967,037.62
549,939.11
43.57
-678.52
MWD (3)
7,641.58
84.44
144.00
6,719.44
6,617.44
-2,632.40
-208.27
5,967,013.58
549,958.25
46.69
-704.63
MWD (3)
7,670.73
93.69
151.40
6,719.91
6,617.91
-2,657.00
-192.72
5,966,989.09
549,973.96
4D.62
-727.65
MWD (3)
7,700.83
100.93
160.10
6,716.08
6,614.08
-2,684.17
-180.46
5,966,962.01
549,986.40
37.41
-748.46
MWD (3)
7,730.48
97.67
172.62
6,711.27
6,609.27
-2,712.54
-173.59
5,966,933.68
549,993.46
43.09
-764.62
MWD (3)
7,760.63
94.30
184.58
6,708.11
6,606.11
-2,742.46
-172.87
5,966,903.77
549,994.38
41.00
-775.53
MWD (3)
7,790.76
89.91
196.57
6,707.00
6,605.00
-2,771.99
-178.39
5,966,874.20
549,989.06
42.34
-780.45
MWD (3)
7,820.78
91.38
209.44
6,706.66
6,604.67
-2,799.57
-190.10
5,966,846.56
549,977.54
43.15
-778.88
MWD (3)
7,850.81
88.59
222.08
6,706.67
6,604.67
-2,823.88
-207.61
5,966,822.13
549,960.19
43.10
-770.74
MWD (3)
7,880.40
89.11
234.64
6,707.27
6,605.27
-2,843.50
-229.67
5,966,802.36
549,938.26
42.47
-756.71
MWD (3)
7,910.51
89.60
247.40
6,707.61
6,605.61
-2,858.06
-255.96
5,966,787.63
549,912.08
42.41
-736.99
MWD (3)
7,940.43
94.73
256.83
6,706.48
6,604.48
-2,867.23
-284.37
5,966,778.27
549,883.73
35.85
-713.43
MWD (3)
7,965.13
92.24
265.80
6,704.97
6,602.97
-2,870.95
-308.71
5,966,774.39
549,859.41
37.62
-691.83
MWD (3)
7,995.15
95.66
271.67
6,702.90
6,600.90
-2,871.61
-338.64
5,966,773.53
549,829.50
22.59
-663.93
MWD (3)
8,025.40
94.80
286.17
6,700.13
6,598.13
-2,866.95
-368.31
5,966,777.99
549,799.79
47.82
-634.45
MWD (3)
8,056.09
89.69
297.27
6,698.93
6,596.93
-2,855.62
-396.75
5,966,789.13
549,771.29
39.78
-603.86
MWD (3)
8,085.87
90.52
310.10
6,698.87
6,596.87
-2,839.14
-421.48
5,966,805.45
549,746.45
43.17
-574.98
MWD (3)
8,116.15
86.25
316.88
6,699.72
6,597.72
-2,818.32
-443.42
5,966,826.11
549,724.37
26.45
-547.25
MWD (3)
8,145.85
86.62
319.10
6,701.57
6,599.57
-2,796.30
-463.26
5,966,848.00
549,704.39
7.56
-521.07
MWD (3)
8,175.49
87.61
318.67
6,703.06
6,601.06
-2,774.00
-482.72
5,966,870.17
549,684.78
3.64
-495.15
MWD (3)
8,205.40
87.11
317.34
6,704.44
6,6D2.44
-2,751.79
-502.71
5,966,892.24
549,664.64
4.75
-468.77
MWD (3)
8,235.43
90.06
318.21
6,705.18
6,6D3.18
-2,729.56
-522.88
5,966,914.33
549,644.32
10.24
-442.22
MWD (3)
8,265.82
92.21
317.58
6,704.58
6,602.58
-2,707.02
-543.25
5,966,936.73
549,623.80
7.37
-415.36
MWD (3)
8,297.17
93.01
315.98
6,703.15
6,601.15
-2,664.20
-564.70
5,966,959.41
549,602.21
5.70
-387.41
MWD (3)
8,325.09
93.01
313.19
6,701.69
6,599.69
-2,664.63
-584.56
5,966,978.84
549,582.22
9.98
-362.06
MWD (3)
8,355.13
90.77
313.62
6,700.70
6,598.70
-2,644.00
-606.37
5,966,999.32
549,560.28
7.59
-334.50
MWD (3)
8,385.09
87.24
313.87
6,701.22
6,599.22
-2,623.29
-628.00
5,967,019.88
549,538.50
11.81
-307.09
MWD (3)
8,414.21
85.42
311.97
6,703.08
6,601.08
-2,603.50
-649.28
5,967,039.53
549,517.10
9.03
-280.32
MWD (3)
8,445.45
86.13
309.74
6,705.38
6,603.38
-2,583.13
-672.85
5,967,059.75
549,493.40
7.47
-251.21
MWD (3)
Annotation
TIP
KOP
12/20/2016 9:04:29AM Page 3 COMPASS 5000.1 Build 74
12/20/2016 9:04:29AM Page 4 COMPASS 5000.1 Build 74
".-
ConocoPhillips
RAW
ConocoPhillips
HUGHES
Definitive Survey Report
Company:
ConocoPhillips (Alaska)
Inc. -Kup1
Local Co-ordinate Reference:
Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft
Well:
1B-18
North Reference:
True
Wellbore:
1 B-18AL2
Survey Calculation Method:
Minimum Curvature
Design:
1 B-18AL2
Database:
EDM Alaska NSK Sandbox
Survey
Map
Map
Vertical
MD
Inc Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting DLS
Section
(usft)
(°) (°)
(usft)
(usft)
(usft)
(usft)
(°/100')
Survey Tool Name
Annotation
(ft)
(ft)
(ft)
8,475.30
88.43 308.35
6,706.80
6,604.80
-2,564.35
-696.00 5,967,078.37
549,470.12 9.00
-223.03
MWD (3)
8,505.30
90.64 307.21
6,707.04
6,605.04
-2,545.97
-719.71 5,967,096.59
549,446.29 8.29
-194.47
MWD (3)
8,568.00
90.64 307.21
6,706.34
6,604.34
-2,508.05
-769.64 5,967,134.16
549,396.11 0.00
-134.58
PROJECTED to TD
12/20/2016 9:04:29AM Page 4 COMPASS 5000.1 Build 74
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
RECEIVED
DEC 1 () 1016
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 a. Well Status: Oil ❑✓ . Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspende❑
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG[] WDSPL ❑ No. of Completions:
1 b. Well Class:
Development 0 Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Com Susp., or �,J1Nl(Lg
Aband.: 4-_;Y 6 6 ��
14. Permit to Drill Number / Sundry:
216-110
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
12/8/2016
15. API Number:
50-029-22472-61-00
4a. Location of Well (Governmental Section):
Surface: 500' FNL, 292' FEL, Sec. 9, T11N, RI OE, UM
Top of Productive Interval:
3071' FNL, 545 FEL, Sec. 9, T1IN, R1 OE, UM
Total Depth:
3009' FNL, 1066' FEL, Sec. 9, T11 N, R1 OE, UM
8. Date TD Reached:
12/13/2016
16. Well Name and Number:
KRU 1B-18AL2
9. Ref Elevations: KB: Ips "
GL 61 BF: 41
17. Field / Pool(s):
Kuparuk River Field/ Oil Pool ,
10. Plug Back Depth MD/TVD:
8196' MD/6704' TVD
18. Property Designation:
ADL 25648
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 550147 y- 5969648 Zone- 4
TPI: x- 549917 y- 5967075 Zone- 4
Total Depth: x- 549396 y- 5967134 Zone- 4
11. Total Depth MD/TVD:
8568' MD/6706" TVD
19. Land Use Permit:
ALK 466
12. SSSV Depth MD/TVD:
N/A
20. Thickness of Permafrost MD/TVD:
160271602'
5. Directional or Inclination Survey: Yes ❑✓ (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
7610' MD/ 6713' TVD
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/RES
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MD HOLE SIZE CEMENTING RECORD SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM PULLED
16" 62.5 H-40 43 121 43 121 24" 200 sx ASI
7-5/8" 29.7 L-80 41 4256 41 4148 9.875" 650 ASIII, 300 sx G
5"x5.5" 17/18 L-80 26 7809 26 6930 6.75" 210 sx G
2-3/8" 4.6 L-80 6994 8196 6298 6704 3 Slotted Liner
24. Open to production or injection? Yes ❑ No ❑
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number): Perfs cement squeezed prior to CTD operations
Slotted Liner from 8387'-10092' MD /6698'-6654' ND
C01APLE f ION
DATE
VERIFIED
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
3-1/2" 7061 6934' MD /6244 ' TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes ❑ No
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
12/22/2016
Method of Operation (Flowing, gas lift, etc.):
Gas Lift
Date of Test:
12/25/2016
Hours Tested:
18
Production for
Test Period
Oil -Bbl:
476
Gas -MCF:
915
Water -Bbl:
55
Choke Size:
176 bean
Gas -Oil Ratio:
2107 scf/stb
Flow Tubing
Press. 140
Casinq Press:
1042
Calculated
24 -Hour Rate
Oil -Bbl:
590
Gas -MCF:
1244
Water -Bbl:
73
Oil Gravity - API (corr):
21
Form 10-407 Revised 1112015 CONTI LIED ON PAGE 2 ' nR1GINIAL on
28. CORE DATA Conventional C,. _,$): Yes ❑ No ❑� Sidewall Cores: i es ❑ No ❑�
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑✓
If yes, list intervals and formations tested, briefly summarizing test results.
Base PERMAFROST
1602
1602
KOP (Kuparuk A4)
7610
6713
Attach separate pages to this form, if needed, and submit detailed test
TPI (Kuparuk A Sand)
7566
6697
information, including reports, per 20 AAC 25.071.
TD (Kuparuk A4)
8568
6706
31. List of Attachments:
Summary of daily operations, well schematics and final directional surveys.
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. I hereby certify that khe foregoing is true and correct to the best of my knowledge.
Contact: Jeff Conk Email: 'eff.s.con nell conOCO hllll S.00171
Printed Name: G. Eller Title: Principal CTD Engineer
Signature: Phone: (907)-263-4172 Date: __Z%'.
INSTRUCTIONS
General: This form and the required atta hments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 11/2015 Submit ORIGINAL Only
1 B-18 CTD Working Schematic
16" 62# H-40
shoe @ 121'
MD
7-5/8" 29.7# L-80
shoe @ 4147' MD
5.5" 17# L-80 shoe
@ 6997' MD
C -sand perfs (sqz'd)
7131'- 7273' MD
FKOP @ 7392' MD
3V" x 5" TTWS set at 0° toolface
KOP @ 7502' MD
3'/2" x 5" TTWS set at 3300 toolface
A -sand perfs (sqz'd)
7256'- 7575' MD
Tapered Prod Csq
5'/z, 17#, L-80, 0'-7044' MD
5", 18#, L-80, 7044'-7809' MD
Camco BP -6 injection nipple @ 1951' MD
ID = 2.813"
3-1/2" 9.3# L-80 ELIE 8rd Tubing to surface
3-1/2" Camco gas lift mandrels @ 2629', 4223', 5498', 6335'&
6862'
X -nipple @ 6895' MD
ID = 2.812"ID
Baker GBH -22 Loactor & Seal assembly at 6918
Baker 3-1/2" PBR @ 6920' MD (3" ID)
Baker KBH-22 anchor seal assembly at 6933' MD
Baker FA -1 packer @ 6934' MD
5" casing sealbore extension @ 7044' (4.0" ID)
Liner -top packer set post -rig at
6994' MD & swell packer at 7535'
MD (in A5 sand) to ensure no C -
sand production
1 B-1 BA TD @ 9500' MD
Liner Bottom at 8315' MD
Liner Top at 7412' MD (in 5")
113-18AL2 (West)
KO billet at 7610' MD
TD at 8,568' MD
Liner from 8196'- 6994' MD
1B-18AL3 (Northeast)
KO billet at 8094' MD
TD at 9788' MD
Liner from 9786- 7609' MD
1B-18AL3PB1 (Northeast)
TD @ 9098' MD
113-18AL1 (East)
KO billet at 8449' MD
TD at10,200'MD
.�.
Liner from 10,092'- 8387' MD
1 B-18AL3-01 (East)
KO billet at 8387' MD
TD at 10,900' MD
Liner from 10,900'- 8094' MD
Operations Summary (with Timelog Depths)
_ 9
.
ti 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
StartTime
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/28/2016
10/28/2016
1.00
MIRU
MOVE
RURD
P
Complete pre move check list.
0.0
0.0
12:00
13:00
10/28/2016
10/28/2016
4.00
MIRU
MOVE
MOB
P
Trucks on location, PJSM, stage pits
0.0
0.0
13:00
17:00
on pad, pull sub off 213-02, hook up
jeeps, move rig to 2C pad access
road.
10/28/2016
10/28/2016
1.00
MIRU
MOVE
WAIT
T
Wait at 2C pad access for CPF2 crew
0.0
0.0
17:00
18:00
change out.
10/28/2016
10/28/2016
3.00
MIRU
MOVE
MOB
P
Move rig from 2C pad to 1B -pad.
0.0
0.0
18:00
21:00
10/28/2016
10/28/2016
0.50
MIRU
MOVE
MOB
P
Remove jeeps, prep 1B-18, set
0.0
0.0
21:00
21:30
herculite and mat.
10/28/2016
10/28/2016
1.25
MIRU
MOVE
MOB
P
Spot sub over 1B-18, lay mats and set
0.0
0.0
21:30
22:45
down.
10/28/2016
10/29/2016
1.25
MIRU
MOVE
MOB
P
Spot pits, lay mays and set down
0.0
0.0
22:45
00:00
10/29/2016
10/29/2016
1.00
MIRU
MOVE
RURD
P
Release trucks, lower BOPE's, work
0.0
0.0
00:00
01:00
on post rig move check list.
10/29/2016
10/29/2016
3.00
MIRU
MOVE
RURD
P
Start rig up checklist. Hook up steam.
0.0
0.0
01:00
04:00
berm celler. Hook up PUTZ
interconnect. RU flowline.
10/29/2016
10/29/2016
2.00
MIRU
WHDBOP
NUND
P
NU BOPE. Install choke hose and
0.0
0.0
04:00
06:00
annular hydraulics. Check tree bolts,
all tight (40 minutes). Grease choke
valves and BOP valves.
10/29/2016
10/29/2016
3.00
MIRU
WHDBOP
CTOP
P
Perform Slack Management, trim 105
0.0
0.0
06:00
09:00
ft of coil to find wire, install CTC, pull
tested to 52 k, re -headed BHI upper
quick (sim-ops),
10/29/2016
10/29/2016
8.00
MIRU
WHDBOP
BOPE
P
Start BOP testing, test witness waived
0.0
0.0
09:00
17:00
per state tester Jeff Jones, 3,500 psi
high/250 psi low/2,500 annular
preventor. Stab INJH test inner reel
valve, stripper, and tiger tank line.
10/29/2016
10/29/2016
2.50
MIRU
WHDBOP
PRTS
P
Pressure test CTC 4,000 psi, good.
0.0
0.0
17:00
19:30
Post BOPE grease choke and BOPE
valves. RD testing equipment, freeze
protect test pump, store test joint back
onto rack in pipe shed. SimOps-
Calibrate MM with Dave Smith.
10/29/2016
10/29/2016
2.50
MIRU
WHDBOP
MPSP
P
PJSM, Load BPV equipment, MU and
0.0
0.0
19:30
22:00
lubricate out BPV, tubing 230 psi,
bleed tubing to zero, still flowing, RD
BPV equipment, off load same while
performing valve alignment check list,
blow down TT line.
10/29/2016
10/30/2016
2.00
PROD1
WHPST
PULD
P
PJSM- Install checks, MU milling BHA
0.0
74.3
22:00
00:00
#1, 0.6° motor with 2.79" string reamer
and 2.79" no-go window mill, MU to
CoilTrak, surface test
10/30/2016
10/30/2016
1.85
PROD1
WHPST
TRIP
P
RI with window milling BHA#1
74.3
6,930.0
00:00
01:51
10/30/2016
10/30/2016
0.45
PROD1
WHPST
DLOG
P
Tie in to K1 for minus 4.0 ft correction,
6,930.0
6,995.0
01:51
02:18
continue to log HRZ
10/30/2016
10/30/2016
0.70
PROD1
WHPST
TRIP
P
RIH, dry tag pinch point at 7,506 ft,
6,995.0
7,506.0
02:18
03:00
PUW 34k, set milling parameters.
Page 1/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
.fP.i
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (MB)
10/30/2016
10/30/2016
1.10
PROD1
WHPST
WPST
P
7505.3 ft. Milling 1.53 bpm at 3,769
7,506.0
7,506.7
03:00
04:06
psi FS per recomended practice, WHP
0, IA 400, OA 3, getting crude
stringers back, take 5 bbls out, adjust
WHP to 200 psi, pumping 7 bph away
10/30/2016
10/30/2016
0.60
PROD1
WHPST
WPST
T
7,506.7 ft. Stall motor, PU, set
7,506.7
7,506.7
04:06
04:42
parameters, free spin higher, attempt
to restart milling and stalled, chunked
motor suspect, unable to pump
through bit, Open EDC.
10/30/2016
10/30/2016
2.00
PROD1
WHPST
TRIP
T
POOH for new motor
7,506.7
74.3
04:42
06:42
10/30/2016
10/30/2016
1.50
PROD1
WHPST
PULD
T
PJSM, undeploy failed milling BHA# 1,
74.3
0.0
06:42
08:12
WHP dropped to zero, check well for
flow (no-flow) LD motor
10/30/2016
10/30/2016
1.25
PROD1
WHPST
PULD
T
PU/MU BHA# 2 with new motor and
0.0
74.3
08:12
09:27
mills.
10/30/2016
10/30/2016
1.75
PROD1
WHPST
TRIP
T
Tag up set counters, RIH
74.3
6,960.0
09:27
11:12
10/30/2016
10/30/2016
0.50
PROD1
WHPST
DLOG
T
Log the K1 correction of minus 4.5',
6,960.0
7,506.0
11:12
11:42
continue RIH to pinch point.
'** Note: NPT 7.0 hrs Baker Hughes.
10/30/2016
10/30/2016
8.60
PROD1
WHPST
MILL
P
Dry tag pinch point at 7,506', PUW 32
7,506.0
7,527.0
11:42
20:18
k, 1.45 bpm at 3735 psi FS, BHP
3,597, open choke, IA 357, OA 3,
holding 1:1 returns. Once bit outside
casing, slowly bring ECD up to 11.8 at
window, 1.44 bpm at 4,120 psi, BHP
4,025 psi, WHP 433, 1.30 bpm rate
out, -8 bph losses.
10/30/2016
10/30/2016
2.30
PROD1
WHPST
REAM
P
7,527 ft. TD rathole. back ream
7,527.0
7,527.0
20:18
22:36
window area, 330R, 30OR and HS, dry
drift window, clean, open EDC
10/30/2016
10/31/2016
1.40
PROD1
WHPST
TRIP
P
POOH for drilling BHA maintaining
7,527.0
2,000.0
22:36
00:00
11.8 tripping schedule.
10/31/2016
10/31/2016
0.75
PROD1
WHPST
TRIP
P
POOH for drilling BHA maintaining
2,000.0
74.3
00:00
00:45
11.8 tripping schedule.
10/31/2016
10131/2016
1.35
PROD1
WHPST
PULD
P
PUD / LD BHA #2
74.3
0.0
00:45
02:06
10/31/2016
10/31/2016
1.60
PROD1
DRILL
PULD
P
PJSM- MU/PD drilling BHA #3, MU to
0.0
72.2
02:06
03:42
CoilTrak, surface test.
10/31/2016
10/31/2016
1.65
PROD1
DRILL
TRIP
P
RIH with BHA #3, 2.3-° AKO motor
72.2
6,950.0
03:42
05:21
and HCC RR 1-1 Bi-center bit, sat
down at 4,239 ft (GLM #2 at 4,223 ft)
PUW 24k, orientate TF 180°, RIH
clean past suspect GLM.
10/31/2016
10/31/2016
0.30
PROD1
DRILL
DLOG
P
Tie in at K1 for minus 4.5 ft correction
6,950.0
6,976.0
05:21
05:39
10/31/2016
10/31/2016
1.00
PROD1
DRILL
TRIP
P
RIH, displacing well to new mud, close
6,976.0
7,527.0
05:39
06:39
EDC, PUW 29 k, continue RIHTB
10/31/2016
10/31/2016
0.85
PROD1
DRILL
DRLG
P
OBD 1.43 bpm at 4,200 psi, BHP
7,527.0
7,533.0
06:39
07:30
4,344, WHP 530, IA 0, OA 6
10/31/2016
10/31/2016
1.75
PROD1
DRILL
TRIP
T
PUH, BHI tools lost power,
7,533.0
74.3
07:30
09:15
troubleshoot from surface, (issue
pointing down hole via troubleshooting
flowchart.
Page 2137 Report Printed: 12127/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC
Time Log
Start Time
I End Time
Our (hr)
Phase
Op Code
I Activi
10/31/2016
10/31/2016
2.00
PROM
DRILL
PULD
09:15
11:15
0.0
6,973.0
11/1/2016
11/1/2016
10/31/2016
10/31/2016
1.75
PROM
DRILL
PULD
11:15
13:00
11/1/2016
11/1/2016
05:00
05:15
10/31/2016
10/31/2016
1.55
PROD1
DRILL
TRIP
13:00
14:33
0.25
T
10/31/2016
10/31/2016
0.25
PROM
DRILL
DLOG
14:33
14:48
*** Note: NPT for failed drilling tools
ft. Continue RIH.
10/31/2016
10/31/2016
0.50
PROD1
DRILL
TRIP
14:48
15:18
RIH, PUW above window 29k, Close
6,972.0
7,533.0
10/31/2016
10/31/2016
6.65
PROM
DRILL
DRLG
15:18
21:57
7,664.0
DRLG
P
4101, WHIP 594, IA 353, OA 7, slow
21:57 100:00
11/112016
1111/2016
00:00
01:21
11/1/2016
11/11/2016
01:21
02:54
(ftKB)
End Depth (ftKB)i
11/1/2016
11/1/2016
02:54
04:27
0.0
6,973.0
11/1/2016
11/1/2016
04:27
04:42
11/1/2016
11/1/2016
04:42
05:00
0.30
PROM
11/1/2016
11/1/2016
05:00
05:15
11/1/2016 11/1/2016
05:15 06:45
06:45 15:00
11/1/2016 11/1/:
15:00 15:30
11/1/2016 11/1/:
15:30 17:30
17:30 120:00
Job: DRILLING SIDETRACK
1.55
PROM
DRILL
Start Depth
T
Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)i
DRILL
T
PJSM, PUD build section BHA with a
74.3
0.0
6,973.0
2.3° bend motor successfully, inspect
correction
upper quick and flowsub,
0.30
PROM
T
PD, build section BHA# 4 (pre -loaded)
0.0
72.2
6,973.0
7,520.0
Stab INJH, surface test tools (good
test)
0.25
T
RIH with build section BHA# 4
72.2
6,950.0
Log RA at 7,509.5 ft, TOWS at 7,502
T
Log the K1 correction of minus 3.0'
6,950.0
6,972.0
*** Note: NPT for failed drilling tools
ft. Continue RIH.
7.0 hrs.
T
RIH, PUW above window 29k, Close
6,972.0
7,533.0
EDC
hrs.
P
OBD 1.45 bpm at 4093 psi, BHP
7,533.0
7,664.0
DRLG
P
4101, WHIP 594, IA 353, OA 7, slow
7,657.0
7,664.0
drilling thru Anchorite, getting dirty
3.0 k to minus 5.0 k DHWOB, lower
surveys, not solar or environmental
disruption, troubleshoot, suspect DGS.
pump rate work pipe to bottom, back
T
POOH for new BHA
7,664.0
72.2
reaming area from 7,657' up to 7,520'
***Note: NPT for failed drilling tools
8.25
PROM
DRILL
2.0 hrs.
P
7,664 ft. OBD 1.40 bpm at 4,100 psi,
7,664.0
T
PJSM- PUD BHA #4, bit condition 2-2-
72.2
0.0
BT-A-X-1-NO-DTF
0.50
T
PJSM- MU/PD 3rd build BHA #5, 2.32
0.0
72.2
TD build section (EOB), wiper up hole,
7,855.0
AKO motor and RR HCC bit, MU to
Coil Trak, surface test. (Sim -Ops)
seems to be dragging 7,816'
1.55
PROM
DRILL
TRIP
T
RIH with 3rd build BHA #5
72.2
6,950.0
0.25
PROD1
DRILL
DLOG
T
Tie in to K1 for a minus 3.5 ft
6,950.0
6,973.0
correction
0.30
PROM
DRILL
TRIP
T
RIH, PUW above window 29k, close
6,973.0
7,520.0
EDC, clean thru window.
0.25
PROM
DRILL
DLOG
T
Log RA at 7,509.5 ft, TOWS at 7,502
7,520.0
7,657.0
ft. Continue RIH.
***Note: NPT for failed drilling tools 5
hrs.
1.50
PROM
DRILL
DRLG
P
Stack weight, PUH, dragging minus
7,657.0
7,664.0
3.0 k to minus 5.0 k DHWOB, lower
pump rate work pipe to bottom, back
reaming area from 7,657' up to 7,520'
8.25
PROM
DRILL
DRLG
P
7,664 ft. OBD 1.40 bpm at 4,100 psi,
7,664.0
7,855.0
BHP 4,138, WHP 539, IA 533, OA 11
0.50
PROD1
DRILL
TRIP
P
TD build section (EOB), wiper up hole,
7,855.0
7,816.0
seems to be dragging 7,816'
2.00
PROM
DRILL
TRIP
P
Continue wiper up hole, cleaning open
7,816.0
7,060.0
hole.
Jog tubing tail area. Significant
cuttings observed over the shaker at
bottoms up.
2.50
PROD1
DRILL
TRIP
P
Open EDC, continue POOH. Tag up
7,060.0
66.0
and space out at surface.
Page 3/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/1/2016
11/1/2016
1.00
PROD1
DRILL
PULD
P
PJSM. PUD build BHA#5. Bit graded
66.0
0.0
20:00
21:00
1-1.
11/1/2016
11/1/2016
1.25
PROD1
DRILL
PULD
P
PJSM, PD lateral BHA #6 with 0.5°
0.0
74.0
21:00
22:15
Weatherford motor and RB HYC bit.
11/1/2016
11/2/2016
1.75
PROD1
DRILL
TRIP
P
RIH with BHA #6. Tie in to K1 for a -
74.0
6,984.0
22:15
00:00
3.5 ft correction.
11/2/2016
11/2/2016
0.75
PROD1
DRILL
TRIP
P
Continue running in the hole. Tie in to
6,984.0
7,855.0
00:00
00:45
the K1 for a -3.5 ft correction. Close
EDC at the window. PUW = 29KIbs.
Continue in the hole to bottom. No
issues.
11/2/2016
11/2/2016
3.00
PROD1
DRILL
DRLG
P
BOBD. 1.40 bpm at 4,500 psi, BHP
7,855.0
8,104.0
00:45
03:45
4,145 psi, ROP 20-120 fph.
11/2/2016
11/2/2016
1.75
PROD1
DRILL
DRLG
P
Motor stall at 8104 ft. PU and restart.
8,104.0
8,255.0
03:45
05:30
Stall a second time. PU and restart,
continue drilling ahead.
PUW 31 Klbs.
11/2/2016
1112/2016
1.00
PROD1
DRILL
WPRT
P
PUH for wiper trip. PUW = 32, pulled
8,255.0
7,080.0
05:30
06:30
heavy negaitive DHWOB, CTSW = 35
k, work area (clean), continue wiper
up hole.
11/2/2016
11/2/2016
0.75
PROD1
DRILL
WPRT
P
Jog/clean the 5"
7,080.0
7,500.0
06:30
07:15
11/2/2016
11/2/2016
0.85
PROD1
DRILL
WPRT
P
Wiper back in hole RIW 10 k
7,500.0
8,255.0
07:15
08:06
11/2/2016
11/2/2016
3.50
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4,397 psi, BHP
8,255.0
8,543.0
08:06
11:36
4125, WHP 352, IA 238, OA 6
11/2/2016
11/2/2016
2.25
PROD1
DRILL
WPRT
T
Unable to retrieve clean survey,
8,543.0
8,543.0
11:36
13:51
Perform DD wiper up hole to 7,997',
perform 6 check shots up hole, PUW
32 k, RBIH to bottom, approved to drill
another 30' per TE
11/2/2016
11/2/2016
1.00
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4,130 psi, BHP
8,543.0
8,655.0
13:51
14:51
4,142, WHP 352, IA 279, OA 6
11/2/2016
11/2/2016
0.75
PROD1
DRILL
WPRT
P
Wiper up hole 7,550' fora tie in. PUW
8,655.0
7,550.0
14:51
15:36
32 k
11/2/2016
11/2/2016
0.25
PROD1
DRILL
DLOG
P
Log the RA marker correction of plus
7,550.0
7,615.0
15:36
15:51
3.0'
11/2/2016
11/2/2016
0.50
PROD1
DRILL
WPRT
P
Wiper back in hole
7,615.0
8,655.0
15:51
16:21
j
11/2/2016
11/2/2016
1.00
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4330 psi, BHP
8,655.0
8,667.0
16:21
17:21
4125, WHP 217, IA 219, OA 7
11/2/2016
11/2/2016
1.40
PROD1
DRILL
WPRT
T
DD wiper up hole, PUW 29 k unable to
8,667.0
8,667.0
17:21
18:45
get a clean survey, discuss with town
team, approved to drill to 8725 ft (95 ft
past last clean survey at 8630 ft.)
11/2/2016
11/2/2016
0.50
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4530 psi, BHP
8,667.0
8,725.0
18:45
19:15
4125, WOB 1.7 Klbs, ROP 90-120 fph.
Unable to obtain clean survey.
Discuss with town. POOH to
reconfigure BHA.
11/2/2016
11/2/2016
1.25
PROD1
DRILL
TRIP
T
POOH with BHA #6. PUW = 30 Klbs.
8,725.0
7,500.0
19:15
20:30
Pulled heavy at 7672 ft, 7665 ft, 7660
ft, 7643 ft and 7611 ft. (-)7KIbs WOB.
Worked BHA up into 5" casing.
11/2/2016
11/2/2016
0.75
PROD1
DRILL
CIRC
P
Jog 5" casing.
7,500.0
7,060.0
20:30
21:15
Page 4/37 Report Printed: 1 212 7/2 01 6
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/2/2016
11/3/2016
2.75
PROD1
DRILL
TRIP
P
Continue POOH with BHA#6. Bump
7,060.0
74.0
21:15
00:00
up at surface and space out. Begin
PUD BHA #6.
11/3/2016
11/3/2016
0.75
PROD1
DRILL
PULD
T
Finish PUD BHA #6. Bit grade 3-3
74.0
0.0
00:00
00:45
11/3/2016
11/3/2016
0.75
PROD1
DRILL
PULD
T
PD BHA#7 with a 0.5-° AKO motor
0.0
00:45
01:30
and RR BCC bit.
11/3/2016
11/3/2016
2.00
PROD1
DRILL
TRIP
T
RBIH with BHA #7. Tie in to the K1 for
72.0
7,554.0
01:30
03:30
a -2.5 ft correction.
11/3/2016
11/3/2016
0.50
PROD1
DRILL
TRIP
T
Stacked out at 7554 ft while RIH.
7,554.0
7,554.0
03:30
04:00
PUH. PUW=30 Klbs. Attempt to RBIH.
Stack out at 7562 ft. Vary parameters
to try and work through build section.
11/3/2016
11/3/2016
1.75
PROD1
DRILL
TRIP
T
Continue RIH, obtaining check shot
7,554.0
8,725.0
04:00
05:45
Isurveys and resurvey
11/3/2016
11/3/2016
7.75
PROD1
DRILL
DRLG
T
OBD 1.5 bpm at 4,080 psi, BHP 4276,
8,725.0
9,125.0
05:45
13:30
IA 155, OA 7
Mud swap, with new 8.6 ppg flopro
mud at the bit at 9067 ft.
11/3/2016
11/3/2016
0.50
PROD1
DRILL
WPRT
T
Wiper up hole PUW 27 k
9,125.0
8,125.0
13:30
14:00
11/3/2016
11/3/2016
0.50
PROD1
DRILL
WPRT
T
Wiper back in hole. RIW 8 k
8,125.0
9,125.0
14:00
14:30
11/3/2016
11/3/2016
5.25
PROD1
DRILL
DRLG
T
BOBD 1.5 bpm at 3,913 psi, BHP
9,125.0
9,254.0
14:30
19:45
4,233, WHP 623, IA 7, OA 10
11/3/2016
11/3/2016
0.25
PROD1
DRILL
WPRT
T
BHA wiper. PUW = 28 Klbs, SOW =
9,254.0
9,254.0
19:45
20:00
11.8 Klbs.
11/3/2016
11/4/2016
4.00
PROD1
DRILL
DRLG
T
BOBD 1.5 bpm at 4100 psi, BHP
9,254.0
9,453.0
20:00
00:00
4,250, WHP 615, IA 7, OA 10
11/4/2016
11/4/2016
2.50
PROD1
DRILL
DRLG
T
Continue crosscutting down through
9,453.0
9,500.0
00:00
02:30
section.
1.5 bpm at 4200 psi, BHP 4,200
Geologist called TD at 9500 feet.
Pump TD sweeps.
11/4/2016
11/4/2016
2.75
PROD1
DRILL
TRIP
T
POOH with BHA #7. PUW 29KIbs.
9,500.0
7,070.0
02:30
05:15
11/412016
11/4/2016
0.25
PROD1
DRILL
WPRT
T
Jog the 5", pull tight at the tubing tail,
7,070.0
7,215.0
05:15
05:30
RBIH stacked out and stalled motor,
jog again
11/4/2016
11/4/2016
2.25
PROD1
DRILL
WPRT
T
Continue wiper to the swab valves.
7,215.0
72.0
05:30
07:45
11/4/2016
11/4/2016
1.75
PROD1
DRILL
TRIP
T
Tag up at surface, reset counters, RIH
72.0
6,950.0
07:45
09:30
11/4/2016
11/4/2016
0.25
PROD1
DRILL
DLOG
T
Log the K1 correction of minus 2.5'
6,950.0
6,975.0
09:30
09:45
11/4/2016
11/4/2016
1.00
PROD1
DRILL
WPRT
T
Continue RIH to the EOB, POOH
6,975.0
7,855.01
09:45
10:45
11/4/2016
11/4/2016
1.25
PROD1
DRILL
WPRT
T
PUH, cleaning build section, perform
7,855.0
7,070.01
10:45
12:00
jog above window, open EDC, jetting
the 5"
11/4/2016
11/4/2016
0.25
PROD1
DRILL
TRIP
T
Close EDC, wiper back in hole RIW 15
7,070.0
7,655.0
12:00
12:15
k, pull back up hole log RA.
11/4/2016
11/4/2016
0.25
PROD1
DRILL
DLOG
T
Log the RA for no correction.
7,655.0
7,679.0
12:15
12:30
11/4/2016
11/4/2016
4.00
PROD1
DRILL
TRIP
T
RBIH. Tag up at 9210 ft. Multiple
7,679.0
9,252.0
12:30
16:30
stalls. Work BHA down. Could not get
deeper than 9252 ft.
Page 5137 Report Printed: 1 212 712 01 6
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/4/2016
11/4/2016
1.50
FROM
DRILL
TRIP
T
PUH to the window. Pulling heavy in
9,252.0
7,515.0
16:30
18:00
the build section. Work BHA up
towards window.
Tie in to the RA for a +5 ft correction.
11/4/2016
11/4/2016
0.75
PROD1
DRILL
TRIP
T
RBIH. Could not work past 9269 ft.
7,515.0
9,269.0
18:00
18:45
11/4/2016
11/4/2016
3.75
PROD1
DRILL
DISP
T
POOH pumping liner running pill.
9,269.0
72.0
18:45
22:30
Clean trip through build section.
Paint window flag at 6472 ft.
11/4/2016
11/4/2016
0.50
PROD1
DRILL
OWFF
T
Flow check at surface. Static.
72.0
72.0
22:30
23:00
11/4/2016
11/5/2016
1.00
PROD1
DRILL
PULD
T
PJSM. LD BHA#7.
72.0
0.0
23:00
00:00
11/5/2016
11/5/2016
0.25
FROM
DRILL
DRLG
T
Finish LD BHA #7. Bit grade 1-2.
0.0
0.0
00:00
00:15
11/5/2016
11/5/2016
0.75
PROD1
DRILL
BOPE
T
Function test BOPE.
0.0
0.0
00:15
01:00
11/5/2016
11/5/2016
4.50
COMPZ1
CASING
PUTB
T
Prep floor to run liner. PU 29 joints 2-
0.0
0.0
01:00
05:30
3/8" slotted liner. PU/MU anchored
billet assembly. MU CoilTrak tools.
Stab injector.
11/5/2016
11/5/2016
1.50
COMPZ1
CASING
RUNL
T
Bump up and reset counters. RIH with
0.0
7,369.0
05:30
07:00
Iliner on CT.
11/5/2016
11/5/2016
0.25
COMPZ1
CASING
RUNL
T
Correct to the EOP flag at 6,400',
7,369.0
7,369.0
07:00
07:15
minus 5.2'
11/5/2016
11/5/2016
1.00
COMPZ1
CASING
RUNL
T
Close EDC, PUW 29 k, continue RIH
7,369.0
8,315.0
07:15
08:15
to bottom
11/5/2016
11/5/2016
1.50
C0MPZ1
CASING
RUNL
T
Set down plus 7 k, DHWOB, PUH
8,315.0
8,315.0
08:15
09:45
minus 8 k, discuss with town, pull up
to max with out initiating further
setting, or damage to tools string.
CTSW-45 k, DHWOB-minus 18 k,
RBIH to neutral wieght
11/5/2016
11/5/2016
1.00
COMPZ1
CASING
RUNL
T
WOO
8,315.0
8,315.0
09:45
10:45
11/5/2016
11/5/2016
2.00
COMPZ1
CASING
TRIP
T
Bring pump up to shear 3,600 psi,
8,315.0
72.5
10:45
12:45
PUW 28 k, TOB at 7,412'. POOH
11/5/2016
11/5/2016
0.50
COMPZ1
CASING
SFTY
T
Check well for flow, PJSM
72.5
0.0
12:45
13:15
11/5/2016
11/5/2016
0.75
C0MPZ1
CASING
PULD
T
LD, liner setting tools,
0.0
0.0
13:15
14:00
11/5/2016
11/5/2016
1.00
PROD1
RPEQPT
PULD
T
Load WS into pipe shed, MU and
0.0
0.0
14:00
15:00
j
scibe tools, inspect Top Drive
11/5/2016
11/5/2016
1.00
PROD1
RPEQPT
PULD
T
PU/MU/WS BHA# 9
0.0
75.3
15:00
16:00
11/5/2016
11/5/2016
1.50
PROD1
RPEQPT
TRIP
T
RIH, with WS, pumping min rate 0.3
75.3
6,950.0
16:00
17:30
bpm
11/5/2016
11/5/2016
0.25
PROD1
RPEQPT
DLOG
T
log the K1 correction of -2.5 ft.
6,950.0
6,983.0
17:30
17:45
11/5/2016
11/5/2016
0.25
PROM
RPEQPT
TRIP
T
Position WS on depth. PUW = 28
6,983.0
9,405.0
17:45
18:00
Klbs.
11/5/2016
11/5/2016
0.25
FROM
RPEQPT
WPST
T
Close EDC. Bring up pumps and set
9,405.0
9,405.0
18:00
18:15
anchors. Set down 5KIbs WOB to
confirm set. Top of WS set at 7392 ft,
oriented HS.
11/5/2016
11/5/2016
1.25
PROM
RPEQPT
TRIP
T
POOH with WS running tools.
9,405.0
73.0
18:15
19:30
11/5/2016
11/5/2016
0.50
PROM
RPEQPT
OWFF
T
Flow check at surface. Static.
73.0
73.0
19:30
20:00
Page 6137 Report Printed: 1 2/2 712 01 6
Operations Summary (with Timelog Depths)
x 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (MB)
11/5/2016
11/5/2016
0.75
PROD1
RPEQPT
PULD
T
PJSM, LD BHA #9.
73.0
0.0
20:00
20:45
11/5/2016
11/5/2016
1.25
PROD1
WHPST
PULD
T
PJSM. PU BHA #10 with 0.6° AKO
0.0
75.0
20:45
22:00
motor and HCC DSM.
11/5/2016
11/5/2016
1.50
PROD1
WHPST
TRIP
T
RIH with BHA #10.
75.0
6,950.0
22:00
23:30
11/5/2016
11/5/2016
0.25
PROD1
WHPST
DLOG
T
Tie in to the K1 for a -4 correction
6,950.0
7,000.0
23:30
23:45
11/5/2016
11/6/2016
0.25
PROD1
WHPST
TRIP
T
Continue to RIH with BHA #10. Begin
7,000.0
7,371.0
23:45
00:00
displacing well to drilling fluid.
11/6/2016
11/6/2016
1.25
PROD1
WHPST
CIRC
T
Displace well from completion fluid to
7,371.0
7,371.0
00:00
01:15
FloPro drilling fluid.
-Adjust for daylight savings time'"`
11/6/2016
11/6/2016
0.25
PROD1
WHPST
WPST
T
RIH and dry tag WS at 7395 ft (TOWS
7,371.0
7,392.0
01:15
01:30
7392 ft). Begin milling window per
procedure.
11/6/2016
11/6/2016
7.00
PROD1
WHPST
WPST
T
Begin milling window per procedure.
7,392.0
7,401.0
01:30
08:30
11/6/2016
11/6/2016
1.50
PROD1
WHPST
WPST
T
Continue milling with string reamer @
7,401.0
7,403.0
08:30
10:00
1.4 fph,
11/6/2016
11/6/2016
4.00
PROD1
WHPST
WPST
T
Drill rathole towards TD 7417', 1.45
7,403.0
7,417.0
10:00
14:00
bpm at 3840 psi, BHP 4023, WHP
403, IA 61, OA 9
11/6/2016
11/6/2016
1.50
PROD1
WHPST
WPST
T
Back Ream window 0°, 30° ROHS,
7,417.0
7,292.0
14:00
15:30
30° LOHS, and 0°
11/6/2016
11/6/2016
0.25
PROD1
WHPST
WPST
T
PUH, and dry drift window area.
7,292.0
7,417.0
15:30
15:45
11/6/2016
11/6/2016
2.00
PROD1
WHPST
WPST
T
POOH, pumping 1.45 bpm at 3,900
7,417.0
70.0
15:45
17:45
psi, BHP 4,029, WHP 417, IA 97, OA
0
11/6/2016
11/6/2016
1.50
PROD1
WHPST
PULD
T
PJSM. PUD BHA#10. Crew change.
70.0
0.0
17:45
19:15
Finish PUD.
Mill gauge 2.79" no-go.
11/6/2016
11/6/2016
2.00
PROD1
DRILL
PULD
T
PJSM, PD Build BHA#11 with 1.7°
0.0
74.0
19:15
21:15
AKO motor and HCC bit.
11/6/2016
11/7/2016
2.75
PROD1
DRILL
TRIP
T
Bump up and reset counters. RIH with
74.0
7,437.0
21:15
00:00
BHA #11. Log the K1 for a -3 ft
correction. Close EDC. PUW at the
window = 37 Klbs.
11/7/2016
11/7/2016
6.75
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.45 bpm at 4200
7,437.0
7,562.0
00:00
06:45
psi. WOB = 2-3 Klbs. CTW = 12.5
Klbs, BHP = 4140 psi. ROP = 5-80
fph.
Some stalls observed while drilling this
interval.
11/7/2016
11/7/2016
2.75
PROD1
DRILL
TRIP
T
POOH, perform jog in the 5" with open
7,562.0
72.2
06:45
09:30
EDC
11/7/2016
11/7/2016
1.25
PROD1
DRILL
PULD
T
OOH, PJSM, PUD and LD build
72.2
0.0
09:30
10:45
section BHA# 11
11/7/2016
11/7/2016
1.00
PROD1
DRILL
SVRG
T
Service INJH, change oil in TOP
0.0
0.0
10:45
11:45
Drive.
11/7/2016
11/7/2016
1.25
PROD1
DRILL
PULD
T
PJSM, PD second build section BHA#
0.0
72.2
11:45
13:00
12 with 2.3° motor and RR HCC bi-
center bit.
11/7/2016
11/7/2016
2.00
PROD1
DRILL
TRIP
T
RIH, slowing down 20 fpm pass
72.2
6,950.0
13:00
15:00
1jewlery.
Page 7/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
r�.
}' �r 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Cade
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/7/2016
11/7/2016
0.45
PROD1
DRILL
DLOG
T
Log the K1 marker correction of minus
6,950.0
6,977.0
15:00
15:27
3.0', continue RIH to log RA marker.
11/7/2016
11/7/2016
0.30
PROM
DRILL
DLOG
T
Log the RA no correction
6,977.0
7,432.0
15:27
15:45
TOWS=7,392.15'
BOW= 7,401'
RA= 7399.5'
11/7/2016
11/7/2016
0.30
PROD1
DRILL
TRIP
T
Continue RIH to bottom
7,432.0
7,562.0
15:45
16:03
11/7/2016
11/7/2016
5.25
PROD1
DRILL
DRLG
T
OBD 1.45 bpm at 4035 psi FS, BHP
7,562.0
7,599.0
16:03
21:18
4108, WHP 380, IA 0, OA 7
11/7/2016
11/7/2016
0.25
PROD1
DRILL
WPRT
T
Wiper up hole PUW 29 k
7,599.0
7,476.0
21:18
21:33
11/7/2016
11/7/2016
0.25
PROD1
DRILL
WPRT
T
Wiper back in hole, RIW 15 k
7,476.0
7,599.0
21:33
21:48
11/7/2016
11/8/2016
2.20
PROM
DRILL
DRLG
T
BOBD 1.45 bpm at 3950 psi, BHP
7,599.0
7,693.0
21:48
00:00
4141, WHP 437, IA 220, OA 10
11/8/2016
11/8/2016
2.00
PROM
DRILL
DRLG
T
BOBD 1.45 bpm at 3950 psi, BHP
7,693.0
7,800.0
00:00
02:00
4150, WHP 437, IA 220, OA 10
End of build at 7800 ft.
11/8/2016
11/8/2016
2.00
PROM
DRILL
TRIP
T
POOH with BHA #12. PUW = 30KIbs.
7,800.0
70.0
02:00
04:00
11/8/2016
11/8/2016
1.50
PROD1
DRILL
PULD
T
PUD and LD BHA#12.
70.0
0.0
04:00
05:30
11/8/2016
11/8/2016
1.50
PROD1
DRILL
PULD
T
PD BHA#13 with 0.46° AKO motor
0.0
72.0
05:30
07:00
and new HYC bit.
11/8/2016
11/8/2016
2.75
PROD1
DRILL
TRIP
T
RIH with BHA #13.
72.0
6,950.0
07:00
09:45
11/8/2016
11/8/2016
0.25
PROD1
DRILL
DLOG
T
Log K1 for a -2.5 ft correction.
6,950.0
7,000.0
09:45
10:00
11/8/2016
11/8/2016
0.75
PROD1
DRILL
TRIP
T
Continue running in the hole to
7,000.0
7,800.0
10:00
10:45
bottom. PUW at the window = 27KIbs,
Close EDC. Clean trip through window
and open hole.
11/8/2016
11/8/2016
10.14
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.4 bpm at 4230 psi.
7,800.0
8,210.0
10:45
20:53
WOB = 1.5KIbs. CTW = 13.5KIbs.
BHP = 4190 psi.
11/8/2016
11/8/2016
0.55
PROM
DRILL
WPRT
T
Wiper Trip Uphole. PUW = 25k
8,210.0
7,000.0
20:53
21:26
Pumped a 5/5 pill sweep before
PUH.................made several jogs in
5" casing..........
11/8/2016
11/8/2016
0.27
PROM
DRILL
TRIP
T
Trip back in hole
7,000.0
7,385.0
21:26
21:42
11/8/2016
11/8/2016
0.30
PROD1
DRILL
DLOG
T
Log the RA Tag at 7,400' and make a
7,420.0
7,420.0
21:42
22:00
correction of +2'
11/8/2016
11/8/2016
0.45
PROD1
DRILL
TRIP
T
Trip back in hole
7,420.0
8,210.0
22:00
22:27
11/8/2016
11/9/2016
1.54
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.4 bpm at 4251 psi.
8,210.0
8,218.0
22:27
00:00
WOB = 2.25Klbs. CTW = 10.5KIbs.
BHP = 4210 psi. ROP = 4.7 to 6.5 fph
11/9/2016
11/9/2016
2.00
PROM
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4321 psi.
8,218.0
8,236.0
00:00
02:00
WOB = 2.32KIbs. CTW = 11.4KIbs.
BHP = 4220 psi. ROP = 4.0 FPH
11/9/2016
11/9/2016
6.50
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4379 psi.
8,236.0
8,323.0
02:00
08:30
WOB = 1.32KIbs. CTW = 10.8 Klbs.
BHP = 4230 psi. ROP = 7.5 to 30
FPH
Page 8/37 Report Printed: 12/27/2016
Y}F
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (MB)
11/9/2016
11/9/2016
0.25
PROD1
DRILL
WPRT
T
Short wiper. PUW = 28k
8,323.0
8,200.0
08:30
08:45
11/9/2016
11/9/2016
0.25
PROD1
DRILL
WPRT
T
RBIH. SOW = 12k
8,200.0
8,323.0
08:45
09:00
Clean trip in and out.
11/9/2016
11/9/2016
9.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4379 psi.
8,323.0
8,426.0
09:00
18:00
WOB = 1.32KIbs. CTW = 10.8 Klbs.
BHP = 4230 psi. ROP = 7.5 to 30
FPH
11/9/2016
11/9/2016
3.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4364 psi.
8,426.0
8,503.0
18:00
21:00
WOB = 1.39KIbs. CTW = 13.5 Klbs.
BHP = 4254 psi. ROP = 20 to 30 FPH
11/9/2016
11/10/2016
3.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4457 psi.
8,503.0
8,574.0
21:00
00:00
WOB = 2.10KIbs. CTW = 10.5 Klbs.
BHP = 4260 psi. ROP = 20 to 44 FPH
11/10/2016
11/10/2016
1.19
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4257 psi.
8,574.0
8,590.0
00:00
01:11
WOB = 1.63KIbs. CTW = 8.8 Klbs.
BHP = 4320 psi. ROP = 07 to 18 FPH
Pump a 5 x 5 Hi/Lo Vis Pill prior to
beginning wiper trip.......
11/10/2016
11/10/2016
0.38
PROD1
DRILL
DRLG
T
Wiper trip up hole. Initiate a 1,000 ft
8,590.0
7,598.0
01:11
01:34
wiper trip 20 ft earlier than planned
due to verylow ROP (<10 fph) PUW
= 25K
11/10/2016
11/10/2016
0.48
PROD1
DRILL
DRLG
T
Trip back in hole. RIW = 9.3K
7,598.0
8,590.0
01:34
02:03
11/10/2016
11/10/2016
4.45
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.4 bpm at 4209 psi.
8,590.0
8,630.0
02:03
06:30
WOB = 2.03KIbs. CTW = 9.3 Klbs.
BHP = 4282 psi. ROP = 6 to 16 FPH
Initiate swapping to a new mud
system.... switching from FlowVis to
8.7 ppbPowerPro w/3% KlaStop and
6% KCL
New mud at the bit at 8,596' @ 0242
hrs
11/10/2016
11/10/2016
0.25
PROD1
DRILL
WPRT
T
BHA Wiper. PUW = 27 Klbs
8,630.0
8,467.0
06:30
06:45
11/10/2016
11/10/2016
0.25
PROD1
DRILL
WPRT
T
RBIH. SOW 13 Klbs,
8,467.0
8,630.0
06:45
07:00
11/10/2016
11/10/2016
2.25
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.67 bpm at 4300
8,630.0
8,685.0
07:00
09:15
psi. WOB = 1.7KIbs. CTW = 13 Klbs.
BHP = 4280 psi. ROP = 10 to 25 FPH
11/10/2016
11/10/2016
2.75
PROD1
DRILL
TRIP
T
Discuss with town. Made decision to
8,685.0
72.0
09:15
12:00
POOH and c/o bit and BHA.
POOH. PUW = 26 Klbs.
Clean trip out of the hole.
11/10/2016
11/10/2016
1.75
PROD1
DRILL
PULD
T
PJSM. PUD BHA #13. Bit grade 2-2.
72.0
0.0
12:00
13:45
11/10/2016
11/10/2016
1.50
PROD1
DRILL
CTOP
T
Change out LOC. Test e -line.
0.0
0.0
13:45
15:15
11/10/2016
11/10/2016
0.25
PROD1
DRILL
CTOP
T
Change out stripper pack off.
0.0
0.0
15:15
15:30
11/10/2016
11/10/2016
1.68
PROD1
DRILL
PULD
T
PD BHA #14 with 0.5° AJO
0.0
72.0
15:30
17:10
Weatehrford motor and new HYC bit.
Resistivity moved below the DGS.
Page 9137 Report Printed: 1 212 7/2 01 6
Operations Summary (with Timelog Depths)
'' !.
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(WB)
End Depth (MB)
11/10/2016
11/10/2016
1.88
PROD1
DRILL
TRIP
T
RBIH with open EDC pumping at
72.0
6,959.0
17:10
19:03
minimum rate. SOW = 7.9 K
11/10/2016
11/10/2016
0.36
PROD1
DRILL
DLOG
T
Log for K1 Marker and make
6,959.0
7,000.0
19:03
19:25
correction of + 6.5 FT.
Close EDC
11/10/2016
11/10/2016
0.87
PROD1
DRILL
TRIP
T
Resume RIH.............
7,000.0
8,685.0
19:25
20:17
WT CK @ 7,350'= 25K
Slow down to 28 fpm while in build
section........
11/10/2016
11/11/2016
3.71
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.28 bpm at 4272
8,685.0
8,853.0
20:17
00:00
psi. WOB = 1.2Klbs. CTW = 12.4 Klbs.
BHP = 4180 psi. ROP = 40 to 51 FPH
**Perform a BHA wiper trip right
before midnight to help clean out
hole........ having difficulty getting the
bit to turn.
11/11/2016
11/11/2016
1.00
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.28 bpm at 4272
8,853.0
8,886.6
00:00
01:00
psi. WOB = 2.2Klbs. CTW = 12.4 Klbs.
BHP = 4180 psi. ROP = 40 to 51 FPH
**Perform a BHA wiper trip right
before midnight to help clean out
hole........ having difficulty getting the
bit to turn. Now having to stack
considerable WOB to help facilitate
turning.............Geo's can work with
what we're getting...........
11/11/2016
11/11/2016
0.94
PROD1
DRILL
WPRT
T
PUH slowly and confer with town
8,886.6
8,540.0
01:00
01:56
engineer and town GEO........... having
difficulty getting the bit to turn up with
trying numerous options ......... not
getting sufficent enough turn to
facilitate making our next target which
is critical. Waiting for town to decide
on course of action, so still PUH
slowly............ PUW = 27.3K
11/11/2016
11/11/2016
0.20
PROD1
DRILL
TRIP
T
Recieved word from town engineer to
8,540.0
8,886.0
01:56
02:08
proceed forward and "aggressively try
and make next target at 6,645". Start
RBIH SOW = 11.5
11/11/2016
11/11/2016
2.86
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.18 bpm at 4072
8,886.0
8,986.0
02:08
05:00
psi. WOB = 3.1KIbs. CTW = -1.2 Klbs.
BHP = 4140 psi. ROP = 40 to 54 FPH
11/11/2016
11/11/2016
4.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.14 bpm at 3962 psi.
8,986.0
9,080.0
05:00
09:00
WOB = 2.3KIbs. CTW = -3.5 Klbs.
BHP = 4299 psi. ROP = 40 fph
11/11/2016
11/11/2016
1.50
PROD1
DRILL
DRLG
T
OBD. Pumping 1.14 bpm at 3962 psi.
9,080.0
9,098.0
09:00
10:30
WOB = 2.3KIbs. CTW = -3.5 Klbs.
BHP = 4300 psi. ROP decreasing to
<5fph.
Multiple pick ups and restarts to try
and improve ROP.
Page 10137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
yMY 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (WB)
11/11/2016
11/11/2016
3.00
PROD1
DRILL
TRIP
T
After discussion with town. Decision
9,098.0
68.0
10:30
13:30
made to POOH. PUW = 29 Klbs.
Jog 5" window area. Open EDC.
Continue out of the hole.
11/11/2016
11/11/2016
2.00
PROD1
DRILL
PULD
T
PJSM. PUD BHA #14.
68.0
0.0
13:30
15:30
11/11/2016
11/11/2016
2.25
PROD1
STK
PULD
T
PJSM. PD BHA #15, Anchored billet
0.0
72.0
15:30
17:45
assembly.
11/11/2016
11/11/2016
1.82
PROD1
STK
TRIP
T
RIH with Anchored Billet
72.0
6,959.0
17:45
19:34
Assembly............
11/11/2016
11/11/2016
0.22
PROD1
STK
DLOG
T
Logging for K1 Marker and make
6,959.0
7,086.0
19:34
19:47
correction of - 3 ft correction.
11/11/2016
11/11/2016
0.17
PROD1
STK
TRIP
T
Continue RIH with Anchored Billett
7,086.0
7,350.0
19:47
19:57
11/11/2016
11/11/2016
0.06
PROD1
STK
TRIP
T
Stop here. Offline with pump. Close
7,350.0
7,350.0
19:57
20:01
EDC. WT CK = 27k
11/11/2016
11/11/2016
0.20
PROD1
STK
TRIP
T
Continue RIH with Anchored Billett
7,350.0
7,480.0
20:01
20:13
11/11/2016
11/11/2016
0.68
PROD1
STK
TRIP
T
Starting to get some noticable weight
7,480.0
7,480.0
20:13
20:54
bobbles after 7,456 ft. and eventually
setting down too much weight at 7,480
ft. Tried jogging through area and
other different options, but ultimately
could not get past 7,480 ft. Did not
want to get western with the billet due
to proximity to the window and
distance from target set depth. Confer
with town engineer and he agreed we
should POOH and do a clean up run.
Once OOH, we will do the BOP Test
before the clean up run.
11/11/2016
11/11/2016
0.90
PROD1
STK
TRIP
T
Start to POOH and dragging too much
7,480.0
7,383.0
20:54
21:48
weight ......... hopefully the dogs are not
sticking out........... work the billet up
and down slowly and are eventually
able to start POOH albeit slowly.......
11/11/2016
11/11/2016
0.12
PROD1
STK
TRIP
T
Stop here to open EDC and bring
7,383.0
7,383.0
21:48
21:55
pump online at .75 bpm.........
11/11/2016
11/12/2016
2.09
PROD1
STK
TRIP
T
Resume POOH pumping at .75 bpm,
7,383.0
72.3
21:55
00:00
CP = 2,442 PUW = 28k WHP = 841
BHP = 3,805
11/12/2016
11/12/2016
1.75
PROD1
STK
PULD
T
At surface. PUD and LD BHA #15.
68.2
0.0
00:00
01:45
11/12/2016
11/12/2016
1.50
PROD1
STK
PULD
T
Pull floats, MU no=le. Stab on
0.0
0.0
01:45
03:15
lubricator. Flush stack.
11/12/2016
11/12/2016
0.75
PROD1
STK
BOPE
T
Pressure test inner reel valve and
0.0
0.0
03:15
04:00
pack off.
11/12/2016
11/12/2016
2.00
PROD1
STK
SVRG
T
Change out bales on TD. Grease
0.0
0.0
04:00
06:00
stack and choke manifold. Change out
4 foot riser.
11/12/2016
11/12/2016
10.50
PROD1
STK
BOPE
T
Perform BOP Test after PJSM and
0.0
06:00
16:30
after tree is serviced, stack flushed
out, coil displaced with water.
Restest master after greasing.
11/12/2016
11/12/2016
2.27
PROD1
STK
BOPE
T
BOP Test complete. P/U BHA#16
0.0
62.3
16:30
18:46
1
1
w/2.80" Ridge Set Mill
11/12/2016
11/12/2016
2.00
PROD1
STK
PULD
T
Pressure Deploy BHA#16
62.3
62.3
18:46
20:46
I
Page 11137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
{p
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/12/2016
11/12/2016
1.93
PROD1
STK
TRIP
T
RIH pumping at .5 bpm with open
62.3
6,943.0
20:46
22:42
EDC
First 5 x 5 Gel sweep pumped......
11/12/2016
11/12/2016
0.40
PROD1
STK
DLOG
T
Log for K1 Marker and make
6,943.0
6,974.0
22:42
23:06
correction of -2 ft
11/12/2016
11/12/2016
0.08
PROD1
STK
TRIP
T
Continue RIH for clean out run
6,972.0
7,522.0
23:06
23:10
Second 5 x 5 gel pill launched
Close EDC at 7,380 ft............
Reciprocate pipe through 5" to clean
area while first pill is exiting coil......
First sweep back to shakers brought
cuttings to surface.
11/12/2016
11/13/2016
0.82
PROD1
STK
REAM
T
Hit hard tag at 7,522 ft. Reciprocate
7,522.0
7,546.0
23:10
00:00
pipe through this area trying to break
through...... pass 7,522 ft only to tag up
at 7,533 ft...............PUH and
RBIH...............pump third
sweep ............ getting about 2 feet
deeper with each bite ............ very slow
going ............. PUWs are between 25
and 35k
11/13/2016
11/13/2016
1.82
PROD1
STK
REAM
T
Still cleaning cuttings out of build
7,546.0
8,561.0
00:00
01:49
section by taking 50' bites after
breaking through last fill tag at 7,548
ft.
11/13/2016
11/13/2016
1.13
PROD1
STK
REAM
T
Tag something at 8,565.0 ft.
8,561.0
8,589.0
01:49
02:57
Slowly'work past this depth and
continue RIH to 8,589 ft and unable to
go any further. PUW exceeded 50k
and - 15k on WOB............ ID of hole
seems to have swollen...... doesn't act
like fill. Confer with town engineer or
setting billet higher than 8,650 ft.
Waiting on return call with plan
forward.
11/13/2016
11/13/2016
3.05
PROD1
STK
TRIP
T
Engineer called back and said billet
8,589.0
62..0
02:57
06:00
would be set higher, but currently has
not decided on a depth yet. Continue
POOH chasing returns to surface as
planned (pumping sweeps, jogging
through 5" and again at surface).
Begin POOH. PUW = 27K Make
several jogs through 5.............
11/13/2016
11/13/2016
1.75
PROD1
STK
PULD
T
PUD and LD BHA #16. Packed clay
62.0
0.0
06:00
07:45
and cuttings observed in the mill junk
slot area.
11/13/2016
11/13/2016
1.75
PROD1
STK
PULD
T
PJSM. PD BHA #17, anchored billet
0.0
72.0
07:45
09:30
assembly.
11/13/2016
11/13/2016
1.75
PROD1
STK
TRIP
T
RIH with BHA #17.
72.0
6,960.0
09:30
11:15
11/13/2016
11/13/2016
0.25
PROD1
STK
DLOG
T
Log K1 for a -1.5 ft correction.
6,960.0
6,985.0
11:15
11:30
11/13/2016
11/13/2016
1.00
PROD1
STK
TRIP
T
Continue RIH with anchored billet.
6,985.0
8,462.0
11:30
12:30
Weight check at the window = 28KIbs
PUW.
Page 12/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/13/2016
11/13/2016
0.25
PROD1
STK
WPST
T
Position billet on depth (TOB = 8450
8,462.0
8,462.0
12:30
12:45
ft, oriented 25° LOHS). Bring pump
up. Setting tool sheared at 4600 psi.
Set 5klbs down and confirmed set.
11/13/2016
11/13/2016
1.25
PROD1
STK
TRIP
T
POOH with BHA #17.
8,462.0
72.0
12:45
14:00
11/13/2016
11/13/2016
1.80
PROD1
STK
PULD
T
PJSM. PUD BHA#17.
72.0
0.0
14:00
15:48
11/13/2016
11/13/2016
1.35
PROD1
DRILL
PULD
T
PJSM, PD BHA #18 with 0.85° AKO
0.0
72.0
15:48
17:09
motor and RB HCC bit.
11/13/2016
11/13/2016
1.68
PROD1
DRILL
TRIP
T
RIH with EDC open pumping minimum
72.0
6,952.0
17:09
18:49
rate
11/13/2016
11/13/2016
0.21
PROD1
DRILL
DLOG
T
Log for K1 Marker and make
6,952.0
6,980.0
18:49
19:02
correction of -2 ft
11/13/2016
11/13/2016
0.88
PROD1
DRILL
TRIP
T
Resume RIH pumping at minimum
6,980.0
8,450.2
19:02
19:55
rate ....... RIW = 14.51<
11/13/2016
11/13/2016
1.97
PROD1
DRILL
KOST
T
Tag top of billet ........... PUH and
8,450.2
8,450.2
19:55
21:53
perform a 1 00'wiper trip to ensure
clean BHA ......... RBIH and lightly set
down on top of billet to begin
milling ........... having major wieght
transfer issues ........... 7 stalls so
far........... still trying different
tactics ....... .... too much friction and too
many stalls..........
11/13/2016
11/13/2016
0.35
PROD1
DRILL
WPRT
T
Perform a wiper trip to the window and
8,450.2
7,444.0
21:53
22:14
mix a lube pill to pump so as to be
back on bottom when pill comes out
11/13/2016
11/13/2016
0.40
PROD1
DRILL
TRIP
T
RBIH
7,444.0
8,449.2
22:14
22:38
11/13/2016
11/14/2016
1.36
PROD1
STK
KOST
T
BOBM. Still having weight transfer
8,449.2
8,449.2
22:38
00:00
issues and trying different tactics such
as different pump rates, backreaming
passes, wiper trips, different speeds,
changing tool face, etc. with no luck.
Still getting stalls. Have tried pumping
a 20 bbi lube pill which seems to be
helping somewhat.......
11/14/2016
11/14/2016
3.58
PROD1
STK
KOST
T
Continuing to try and kick off billet at
8,449.2
8,449.2
00:00
03:34
8,450 ft. Still working with lube pill and
trying different tactics. Have tried
backreaming, moving the tool face
orietation, different pump rates,
speeds and tried 3 different drillers.
Having weight transfer issues. Have
now pumped beads to help with
weight transfer .................
Page 13/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/14/2016
11/14/2016
3.92
PROD1
STK
KOST
T
After the first 7 bbls of beads are out,
8,449.2
8,457.0
03:34
07:30
we start to get some weight
transfer.............able to gently tag billet
and start milling.............starting to lose
weight again.............PUH for a short
wiper and RBIH and try
again ........... impossible to get weight
transfer without beads .......... continue
drilling, but periodically lose
WOB ...... .Multiple pick ups and
restarts.
Rate = 1.41 bpm, Circ Press = 3,541,
W HP = 608, IA = 38, OA = 07, CTW =
13.9K, WOB = .08 to.46 k
11/14/2016
11/14/2016
2.50
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.5
8,457.0
8,508.0
07:30
10:00
bpm at 4000 psi. BHP = 4280 psi,
WOB = 0.5-0.8KIbs ROP 10-30 fph.
11/14/2016
11/14/2016
0.25
PROD1
DRILL
WPRT
T
PUH and dry drift kick off area. PUW =
8,508.0
8,450.0
10:00
10:15
26KIbs.
Dry drift clean.
11/14/2016
11/14/2016
3.25
PROD1
DRILL
WPRT
T
Continue to PUH into 5" casing and
8,450.0
7,050.0
10:15
13:30
jog area. Choke B plugging up with
cuttings and aluminum. Clean and
clear both Choke B and choke A.
Significant amount of aluminum
observed over the shakers.
11/14/2016
11/14/2016
1.00
PROD1
DRILL
WPRT
T
RBIH. Clean trip through window and
7,050.0
8,508.0
13:30
14:30
open hole.
11/14/2016
11/14/2016
1.00
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.45
8,508.0
8,574.0
14:30
15:30
bpm at 4300 psi. BHP = 4290 psi,
WOB = 1.0KIbs ROP 50-80 fph.
11/14/2016
11/14/2016
0.25
PROD1
DRILL
WPRT
T
PUH for short wiper to 8500, PUW =
8,574.0
8,574.0
15:30
15:45
27KIbs.
11/14/2016
11/14/2016
2.00
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.6
8,574.0
8,810.0
15:45
17:45
bpm at 4300 psi. BHP = 4290 psi,
WOB = 1.9KIbs ROP 20-50 fph.
11/14/2016
11/14/2016
2.75
PROD1
DRILL
WPRT
T
PUH for planned wiper trip. PUW =
8,810.0
7,808.0
17:45
20:30
27KIbs
11/14/2016
11/14/2016
0.50
PROD1
DRILL
WPRT
T
RBI H. SOW 11 Klbs.
7,808.0
8,809.0
20:30
21:00
11/14/2016
11/15/2016
3.00
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.6
8,809.0
8,910.0
21:00
00:00
bpm at 4300 psi. BHP = 4290 psi,
WOB = 1.9KIbs ROP 20-50 fph.
11/15/2016
11/15/2016
5.10
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.6
8,910.0
9,110.0
00:00
05:06
bpm at 4289 psi. BHP = 4320 psi,
WOB = 1.8KIbs ROP 20-80 fph.
Launch 5 x 5 Sweep pill prior to PUH
for wiper trip
11/15/2016
11/15/2016
1.77
PROD1
DRILL
WPRT
T
Perform wiper trip to 5" TT and
9,110.0
7,069.0
05:06
06:52
perform several jogs in 5 " casing
11/15/2016
11/15/2016
1.22
PROD1
DRILL
TRIP
T
Trip back in hole
7,069.0
9,110.0
06:52
08:05
11/15/2016
11/15/2016
5.98
PROD1
DRILL
DRLG
T
BOB drilling ahead. Pumping 1.5 bpm
9,110.0
9,374.8
08:05
14:04
at 4272 psi. BHP = 4294 psi, WOB =
1.2KIbs ROP 20-80 fph.
Page 14137 Report Printed: 12/27/2016
I - Operations Summary (with Timelog Depths)
qq-
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/15/2016
11/15/2016
0.65
PROD1
DRILL
WPRT
T
Perform 1,000 ft wiper trip a little
9,374.8
8,360.0
14:04
14:43
earlier than planned due to losing
push ability..............pumped a sweep
pill..................pill brought back sticky
clay and some shale ...............
11/15/2016
11/15/2016
0.66
PROD1
DRILL
WPRT
T
Trip back in hole
8,360.0
9,374.8
14:43
15:22
**Note: Town engineer called and
would like us to keep an eye on two
hot spots and make note in WSR if
any issue noticed ....... .8,950 ft and
9,163 ft. Notified the day driller
Greg also.
11/15/2016
11/15/2016
5.62
PROD1
DRILL
DRLG
T
BOB drilling ahead. Pumping 1.65
9,374.9
9,469.0
15:22
21:00
bpm at 4172 psi. BHP = 4344 psi,
WOB = 1.0KIbs ROP 20-30 fph.
Swapping to new mud system (#4) at
9,389 ft. Around 1,500 ft on System #3
with .8% DS.
11/15/2016
11/15/2016
2.00
PROD1
DRILL
DRLG
T
OBD 1.65 bpm at 3,993 psi FS, BHP
9,469.0
9,500.0
21:00
23:00
4,355 psi, CWT -7k, WOB .9k, ROP 7,
weight transfer issue, high gama sinse
9,340 ft, confer with town, pumped 25
bbl Drill Zone pill, little help, make up
and pump staggered beaded pills.
11/15/2016
11/16/2016
1.00
PROD1
DRILL
DRLG
P
9,500 ft OBD 1.65 bpm at 3,993 psi
9,500.0
9,516.0
23:00
00:00
FS, BHP 4,367 psi, WOB .8, ROP 20-
30
** Note: off trouble time
11/16/2016
11/16/2016
4.60
PROD1
DRILL
DRLG
P
OBD 1.65 bpm at 3,993 psi FS, BHP
9,516.0
9,582.0
00:00
04:36
4,368 psi, CWT -4.5k, WOB .8k,
continue staggered beaded pill
sweeps, several restarts, BHA wipers,
PUW's consistent 28k to 29k, pump
5x5 sweep
11/16/2016
11/16/2016
1.25
PROD1
DRILL
WPRT
P
Early wiper to window, PUW 29k,
9,582.0
7,069.0
04:36
05:51
Make several jogs in 5...........
11/16/2016
11/16/2016
0.25
PROD1
DRILL
WPRT
P
Wiper back in hole
7,069.0
7,410.0
05:51
06.06
11/16/2016
11/16/2016
0.20
PROD1
DRILL
DLOG
P
Log for RA Tag and make correction
7,410.0
7,428.0
06:06
06:18
of + 5 ft.
11/16/2016
11/16/2016
1.20
PROD1
DRILL
WPRT
P
Continue RBIH
7,428.0
8,889.0
06:18
07:30
11/16/2016
11/16/2016
1.30
PROD1
DRILL
WPRT
P
Having to work through tight spot from
8,889.0
8,956.0
07:30
08:48
8,889 to 8,946 ft. . ............ changing tool
face and pump rates seemed to help.
Appeared to be more hole geometry
and swollen clays than cuttings until
we hit 8,946 ft where it looks like we
have a bed of cuttings ..... ..... -had a
12k overpull here....... town called and
said to work down throough area and
work back up cleaning up this tight
spot
Page 15/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/16/2016
11/16/2016
0.70
PROD1
DRILL
WPRT
P
Town called back and said since we
8,956.0
9,582.0
08:48
09:30
made it through this tight area to head
to bottom and continue drilling until
they call back ............ heading to
bottom
11/16/2016
11/16/2016
8.50
PROD1
DRILL
DRLG
P
BOBD 1.60 bpm at 4,027 psi FS, BHP
9,582.0
9,701.0
09:30
18:00
4,325 psi, CWT-3.5k, WOB .5k,
continue staggered beaded pill
sweeps, several restarts, BHA wipers,
PUW's consistant 29k to 30k. Avg
ROP = 14 fph
11/16/2016
11/17/2016
6.00
PROD1
DRILL
DRLG
P
OBD 1.6 bpm at 4,190 psi FS, BHP
9,701.0
9,819.0
18:00
00:00
4,268 psi, CWT-9.8k, WOB .5k, ROP
18, continue beaded pills, PUW's 26k
to 28k, added 1 % LoTorc lube to
system, seeing better CWT .0k, WOB
1.1 k to 1.5k, ROP 19
11/17/2016
11/17/2016
4.00
PROD1
DRILL
DRLG
P
Continue drilling ahead 1.6 bpm at
9,819.0
9,980.0
00:00
04:00
4,450 psi FS, BHP 4,370 psi,
CWT .0k, WOB 1.1k
11/17/2016
11/17/2016
0.40
PROD1
DRILL
WPRT
P
Wiper trip up hole 900 ft, PUW 26k
9,982.0
9,082.0
04:00
04:24
11/17/2016
11/17/2016
0.55
PROD1
DRILL
WPRT
P
Wiper trip back in hole, slow speed to
9,082.0
9,982.0
04:24
04:57
30 fpm at .8 bpm to work past 9,465 ft
to 9,485 ft, continue in hole.
11/17/2016
11/17/2016
14.95
PROD1
DRILL
DRLG
P
BOBD 1.61 bpm at 4,417 psi FS, BHP
9,982.0
10,200.0
04:57
19:54
4,306 psi, CWT 3k, WOB .7k, ROP 10
to 30
11/17/2016
11/17/2016
1.20
PROM
DRILL
CIRC
P
10,200 ft. TD called, reciprocate pipe,
10,200.0
10,200.0
19:54
21:06
PUW 26k while pumping last of
beaded pill, build Hi/Lo vis sweeps,
pump 10x10 Lo/Hi sweep.
11/17/2016
11/17/2016
1.80
PROD1
DRILL
WPRT
P
Chase sweeps to window, PUW 25k,
10,200.0
7,070.0
21:06
22:54
slow thru window 6 fpm at ,5 bpm.
11/17/2016
11/17/2016
0.95
PROM
DRILL
WPRT
P
Jet/jog 5" 7,370 ft to 7,070 ft 2 times,
7,070.0
7,370.0
22:54
23:51
wait for heavy returns to clean up over
shaker, pump 10x10.
11/17/2016
11/18/2016
0.15
PROM
DRILL
WPRT
P
RBIH to 7,575 ft.
7,370.0
7,575.0
23:51
00:00
11/18/2016
11/18/2016
2.85
PROD1
DRILL
WPRT
P
Continue RIH from 7,575 ft to 8,005 ft,
7,575.0
72.2
00:00
02:51
chase 1 0x1 0 sweeps to 5" and Jet/jog
5" 7,370 ft to 7,070 ft 2 times, wait for
returns to clean up, continue wiper to
swab, 200 ft jog at surface.
11/18/2016
11/18/2016
1.90
PROM
DRILL
TRIP
P
Bump up, reset counters, RBIH to
72.2
6,940.0
02:51
04:45
confirm TD, DS pillow block
overheating, slow RIH speed to
troubleshoot.
11/18/2016
11/18/2016
0.20
PROD1
DRILL
DLOG
P
Tie in to K1 for minus 1.5 ft correction.
6,940.0
6,978.0
04:45
04:57
1Pump
1 0x1 0 sweep
11/18/2016
11/18/2016
0.72
PROD1
DRILL
TRIP
P
Continue RIH to EOB
6,978.0
7,896.0
04:57
05:40
11/18/2016
11/18/2016
0.92
PROM
DRILL
WPRT
P
At EOB.chase sweep to window and
7,896.0
7,086.0
05:40
06:35
make several jogs in 5"
Page 16137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
ti
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
StartTime
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(MB)
End Depth (ftKB)
11/18/2016
11/18/2016
1.33
PROD1
DRILL
TRIP
P
RBIH to confirm TD
7,086.0
10,200.0
06:35
07:55
At 9,009' we tagged up, PUH reduce
pump rate to .5 and went through area
without a weight bobble................no
other issues seen to TD depth.
PUWs were are all in normal
range .....26k until we got to 10,180'
and then we had a 12k
overpull............ looks like TD is at
10,200.0
11/18/2016
11/18/2016
0.35
FROM
DRILL
TRIP
P
On bottom and just started pumping
10,200.0
10,130.0
07:55
08:16
the liner running pill and waiting for pill
to reach bit ...............
11/18/2016
11/18/2016
2.97
FROM
DRILL
TRIP
P
POOH laying in beaded liner pill to
10,130.0
92.0
08:16
11:14
surface and completion fluid (11.8
ppg). 50 fpm and PUW = 25K Paint
flags at 8,372 ft and at 5,572 ft.
11/18/2016
11/18/2016
0.64
FROM
DRILL
OWFF
P
At surface. Perform Flow Check.
92.0
92.0
11:14
11:52
Hold PJSM for laying down BHA #18.
Passing Flow Check
11/18/2016
11/18/2016
0.85
PROD1
DRILL
PULD
P
L/D BHA#18
92.0
0.0
11:52
12:43
11/18/2016
11/18/2016
1.45
COMPZ1
CASING
EQRP
P
Swap out bails after PJSM.
0.0
0.0
12:43
14:10
11/18/2016
11/18/2016
2.60
COMPZ1
CASING
PUTB
P
Start making up 55 joints 2 3/8"
0.0
1,694.0
14:10
16:46
Slotted Liner
Note: Well Flowing BOP Drill
performed.
11/18/2016
11/18/2016
1.45
COMPZI
CASING
PULD
P
MU AU liner assembly to BHA #19,
1,694.0
1,738.2
16:46
18:13
MU to CoilTrak, surface test
11/18/2016
11/18/2016
2.00
COMPZI
CASING
RUNL
P
RIH with BHA #19, Tie in at flag for
1,738.2
8,519.0
18:13
20:13
minus 7 ft correction, PUW 28k, RBIH,
clean thru window and build section.
11/18/2016
11/19/2016
3.77
COMPZI
CASING
RUNL
P
Start stacking, begin working liner
8,519.0
10,092.0
20:13
00:00
assembly down, breakover 35k, broke
free from 9,450 ft to 10,020 ft, work
liner hard, confer with town.
11/19/2016
11/19/2016
0.25
COMPZ1
CASING
RUNL
P
Continue working liner, unable to get
10,092.0
8,398.0
00:00
00:15
deeper than 10,092 ft, confer with
town, PUW 38k, WOB -4.8k. Release
off liner assembly at 1.2 bpm, PUW
32k, WOB -0.5k. reset counters. TOL
8,398 ft.
11/19/2016
11/19/2016
1.95
COMPZI
CASING
TRIP
P
POOH pumping across the top.
8,398.0
44.2
00:15
02:12
11/19/2016
11/19/2016
0.55
COMPZI
CASING
OWFF
P
On surface, flow check, good. PJSM-
44.2
44.2
02:12
02:45
LD BHA over dead well.
11/19/2016
11/19/2016
0.75
COMPZI
CASING
PULD
P
LD BHA#19.
44.2
0.0
02:45
03:30
11/19/2016
11/19/2016
0.50
COMPZI
CASING
BOPE
P
PJSM- Function test BOPE.
0.0
0.0
03:30
04:00
11/19/2016
11/19/2016
1.00
COMPZI
CASING
PULD
P
PJSM- MU OH Anchored billet to BHA
0.0
73.0
04:00
05:00
#20, MU to CoilTrak, surface test,
DPS malfuntioning, unstab to change
out CoilTrak tools.
Page 17/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
18-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
StartTime
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (WB)
11/19/2016
11/19/2016
0.93
COMPZI
CASING
PULD
T
Swap CoilTrak tools.
73.0
73.0
05:00
05:55
11/19/2016
11/19/2016
2.50
COMPZ1
CASING
RUNL
P
RIH with BHA #20, EDC open.
73.0
6,956.0
05:55
08:25
11/19/2016
11/19/2016
0.29
COMPZ1
CASING
DLOG
P
Log for K1 Marker and make
6,956.0
6,982.0
08:25
08:43
correction of minus 1.5 ft
11/19/2016
11/19/2016
0.16
COMPZ1
CASING
RUNL
P
Continue RIH with anchored billet
6,982.0
7,374.0
08:43
08:52
11/19/2016
11/19/2016
0.15
COMPZI
CASING
RUNL
P
Stop here and close EDC and perform
7,374.0
7,374.0
08:52
09:01
a weight check.............WT CK = 26k
11/19/2016
11/19/2016
0.50
COMPZ1
CASING
RUNL
P
Continue RIH with anchored billet
7,374.0
7,418.0
09:01
09:31
11/19/2016
11/19/2016
0.64
COMPZI
CASING
RUNL
T
Tag hard at 7,918 ft with
7,918.0
7,918.0
09:31
10:10
billet .......... set down 3k and could not
get string weight back. Tried PUH 50 ft
and RBIH with no luck...............tried
several other options to no avail. Last
PUW was at 32k ......... Confer with
town engineer and decision made to
POOH and put on a 1.5 degree motor
and 2.80" Ridge Set Mill and clean out
the hole and tag TOL to determine
exact depth.
11/19/2016
11/19/2016
1.84
COMPZ1
CASING
TRIP
T
POOH with anchored billet after
7,918.0
80.6
10:10
12:00
opening EDC and bringing pumps
online at .7 bpm
11/19/2016
11/19/2016
0.68
COMPZI
CASING
OWFF
T
At surface. Perform flow check.
80.6
80.6
12:00
12:41
11/19/2016
11/19/2016
0.40
COMPZI
CASING
PULD
T
L/D BHA #20 BHA came back with
80.6
0.0
12:41
13:05
some sticky clay -like substance on
it..............
11/19/2016
11/19/2016
0.50
COMPZ1
CASING
PULD
T
P/U BHA #21 w/1.5 degree motor and
0.0
67.3
13:05
13:35
2.80" Ridge Set Mill
11/19/2016
11/19/2016
1.20
COMPZI
CASING
TRIP
T
RIH with EDC open pumping at .5
67.3
6,953.0
13:35
14:47
bpm
11/19/2016
11/19/2016
0.26
COMPZI
CASING
DLOG
T
Log for K1 Marker and make
6,953.0
6,972.0
14:47
15:03
correction of minus 1.5 ft
11/19/2016
11/19/2016
0.12
COMPZI
CASING
TRIP
T
Continue RIH
6,792.0
7,297.0
15:03
15:10
11/19/2016
11/19/2016
0.09
COMPZI
CASING
TRIP
T
Stop here and close EDC and perform
7,297.0
7,297.0
15:10
15:15
a weight check.. ........... WT CK = 28k
11/19/2016
11/19/2016
0.31
COMPZI
CASING
TRIP
T
Continue RIH
7,297.0
7,918.0
15:15
15:34
11/19/2016
11/19/2016
0.43
COMPZ1
CASING
REAM
T
Have passed where we were hung up
7,918.0
8,399.0
15:34
16:00
with the billet earlier ........... saw only
the slightest weight
bobble..............continuing creeping in
hole at 20 fpm..... offline with pump
and continue RIH to dry tag TOL at
8,399 ft ....................
11/19/2016
11/19/2016
0.85
COMPZ1
CASING
DISP
T
PUH slowly and bring pump online to
8,399.0
8,380.0
16:00
16:51
displace KWF with 8.8 Power -Pro
before pumping sweeps and cleaning
hole...........
Page 18137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
E IB-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/19/2016
11/19/2016
2.65
COMPZ1
CASING
REAM
T
Start PUH now that KWF has been
8,380.0
7,370.0
16:51
19:30
displace and begin hole cleaning
operations, work area 7,955 ft to 7,840
ft, pump 5x5, RBIH, chase sweep to
window, pump 2nd 5x5, jet/jog F-
7,370 ft to 7,070 ft, wait for sweeps to
come over shaker.
11/19/2016
11/19/2016
1.60
COMPZ1
CASING
TRIP
T
POOH, 200 ft jog at surface. PJSM-
7,370.0
62.3
19:30
21:06
PUD BHA
11/19/2016
11/19/2016
1.85
COMPZ1
CASING
PULD
T
On surafce, Attempt to PUD, unable to
62.3
62.3
21:06
22:57
bleed down, lower checks not holding,
PJSM- scope change, close Annular
and EDC, open bleed to pump, WHP
drops 1,170 psi to 800 psi,
troubleshoot, upper checks not
holding also, confer with town, PD
BHA #21 and RIH to kill well.
11/19/2016
11/19/2016
0.65
COMPZ1
CASING
TRIP
T
RBIH with BHA#21, EDC open,
62.3
62.3
22:57
23:36
attempt flush upper floats 1.7 bpm
while RIH, decided to stop at 350 ft,
shut in well, bleed off to pumps, upper
QC's holding, POOH
11/19/2016
11/20/2016
0.40
COMPZ1
CASING
PULD
T
Bump up, space out, bleed back
62.3
62.3
23:36
00:00
pump, upper checks holding, PJSM-
PUD BHA #21 under 1st contingency,
close Annular, EDC closed.
Note: BHI 3.5 hrs down time.
11/20/2016
11/20/2016
3.35
COMPZ1
CASING
PULD
T
PUD BHA#21, close Annular, EDC
62.3
0.0
00:00
03:21
closed. LD mill and motor, LD upper
half, check connection torques, open
EDC, load PDL and MU anchored
billet.
11/20/2016
11/20/2016
1.50
COMPZ1
CASING
PULD
T
PJSM- PD OH Anchored billet BHA
0.0
72.9
03:21
04:51
#22, replace UQC floats, MU to
CoilTrak, surface test.
11/20/2016
11/20/2016
1.66
COMPZ1
CASING
TRIP
T
RIH with OH Anchored Billet (Shears
72.9
6,954.0
04:51
06:30
screws checked, pinned heavy,
16,960#, 23-28k shear)
11/20/2016
11/20/2016
0.20
COMPZ1
CASING
DLOG
T
Log for K1 Marker and make
6,954.0
6,980.0
06:30
06:42
correction of minus 1.0 ft.
11/20/2016
11/20/2016
0.15
COMPZI
CASING
TRIP
T
Continue RIH with Anchored Billet with
6,980.0
7,372.0
06:42
06:51
open EDC pumping at minimum rate
11/20/2016
11/20/2016
0.55
COMPZ1
CASING
TRIP
T
Continue RIH with anchored
7,372.0
8,399.0
06:51
07:24
billet.......................
Note; Passed the problem area
around 7,918 ft with only a slight
weight bobble.................smooth
sailing down to TOL.......
11/20/2016
11/20/2016
0.28
COMPZ1
CASING
TRIP
P
Tag TOL with billet at 8,399 ft ...... set
8,399.0
8,387.2
07:24
07:41
down 3k........... .PUH to 24 k........ bring
pump online and pump off of
billet ........... TOB at 8,387.25 ft, 150
degrees ROHS
11/20/2016
11/20/2016
1.80
COMPZ1
CASING
TRIP
P
POOH pumping at 1.2 bpm.............
8,387.2
67.8
07:41
09:29
11/20/2016
11/20/2016
0.80
COMPZ1
CASING
PULD
P
At surface. Pressure Undeploy BHA
67.8
67.8
09:29
10:17
#22 after PJSM.
Page 19/37 Report Printed: 12/27/2016
- Operations Summary (with Timelog Depths)
IB -18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (MB)
11/20/2016
11/20/2016
0.40
COMPZ1
CASING
PULD
P
Lay down BHA#22
67.8
0.0
10:17
10:41
11/20/2016
11/2012016
0.55
PROD2
STK
PULD
P
P/UBHA #23w/AKC.8° motor and
0.0
72.1
10:41
11:14
HCC 2.7 X 3.0" bit
11/20/2016
11/20/2016
0.85
PROD2
STK
PULD
P
Pressure Deploy BHA #23
72.1
72.1
11:14
12:05
11/20/2016
11/20/2016
1.10
PROD2
RIGMNT
SVRG
P
Service Rig ------- Service Choke B,
72.1
72.1
12:05
13:11
Rotate Top Drive, Change out Locking
Pin hose on ram.
11/20/2016
11/20/2016
1.33
PROD2
STK
TRIP
P
RIH with open EDC pumping at .5
72.1
6,954.0
13:11
14:31
bpm
11/20/2016
11/20/2016
0.18
PROD2
STK
DLOG
P
Log for K1 Marker and make
6,954.0
6,997.0
14:31
14:42
correction of minus 1.5 ft
11/20/2016
11/20/2016
0.14
PROD2
STK
TRIP
P
Continue RIH
6,997.0
7,381.0
14:42
14:50
11/20/2016
11/20/2016
0.15
PROD2
STK
TRIP
P
Stop here and close EDC and perform
7,381.0
7,381.0
14:50
14:59
a weight check..WT CK = 26k
11/20/2016
11/20/2016
0.30
PROD2
STK
TRIP
P
Continue RIH to billet
7,381.0
8,387.6
14:59
15:17
11/20/2016
11/20/2016
1.50
PROD2
STK
KOST
P
Tag TOB at 8,387.64 ft ......... PUH and
8,387.6
8,387.0
15:17
16:47
start creeping back in hole.............1.5
bpm CP = 3,797 WHP = 510 BHP
=4,272 CTW = 13.87 K W013=34
K
11/20/2016
11/21/2016
7.21
PROD2
STK
KOST
P
OBD ...... 1.59 bpm Circ Press =
8,387.0
8,387.0
16:47
00:00
4,084 WHP = 510 BHP = 4,252
CTW = 24K WOB =.54 K
Having some weight transfer
issues...... have pumped a Hi -Lo Vis
pill and a beaded pill to help........ BHA
wipers, beads, varying speeds, rates
and trenching, engauged at 8,386.6 ft,
aluminum across shaker.
11/21/2016
11/21/2016
3.15
PROD2
STK
KOST
P
Kick off billet using beads, frequent
8,387.0
8,395.0
00:00
03:09
stalls due to stick slipping after
starting, 1.53 bpm at 3,800 psi FS,
BHP 4,250 psi, WHP 495, IA 134, OA
0
11/21/2016
11/21/2016
0.50
PROD2
DRILL
DRLG
P
OBD 1.55 bpm at 3,800 psi FS, BHP
8,395.0
8,430.0
03:09
03:39
4,257 psi, CWT 13.8k, W0130.8k,
ROP 53
11/21/2016
11/21/2016
0.25
PROD2
DRILL
WPRT
P
Wiper up hole above billet to 8,300 ft,
8,430.0
8,430.0
03:39
03:54
PUW 26k, RBIH, dry drift billet area
clean.
11/21/2016
11/21/2016
6.80
PROD2
DRILL
DRLG
P
BOBD 1.61 bpm at 3,998 psi FS, BHP
8,430.0
8,750.0
03:54
10:42
4,268 psi, CWT 11.8k, WOB 1.0k,
ROP 40 to 80 fph
Page 20/37 Report Printed: 1 2/2 712 01 6
5 Operations Summary (with Timelog Depths)
'b: --•:
"r 18-18
a • `
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftK8)
End Depth (ftKB)
11/21/2016
11/21/2016
1.45
PROD2
DRILL
WPRT
P
Once 5 x 5 sweep is out of bit, PUH
8,750.0
8,750.0
10:42
12:09
for a wiper trip to the 5".............make
several jogs in 5............
Town is also looking at the DLS data
to determine if we need to POOH and
change to a lesser degree
motor.............doglegs are coming in at
16 degrees instead of 12
degrees ...............
Jeff calls back and town has decided
to keep what we have on for
now.................DLS is trending
downward... ...........
11/21/2016
11/21/2016
7.53
PROD2
DRILL
DRLG
P
BOBD 1.63 bpm at 4,359 psi FS, BHP
8,750.0
9,008.0
12:09
19:40
4,323 psi, CWT 10.8k, WOB 1.Ok,
ROP 20 to 40 fph
Note: The two dog legs right before
1730hrs were both 16.4 and 18
degrees..........
11/21/2016
11/21/2016
2.00
PROD2
DRILL
WPRT
P
At 9,008 ft and having weight transfer
9,008.0
9,OOB.0
19:40
21:40
issues ............ current mud system has
around 1,400 ft and .8 DS ...... will try
and do a 1,000 ft wiper trip to see if
that helps before doing a mud
swap......... wiper trip did not
help......... start pumping a beaded
pill............
11/21/2016
11/22/2016
2.32
PROD2
DRILL
DRLG
P
BOBD 1.53 bpm at 4,357 psi FS, BHP
9,008.0
9,101.0
21:40
00:00
4,337 psi, CWT 6.3k, WOB 1 Alk, ROP
20 to 50 fph
Note: We got weight transfer back
before the beaded pill exited the
nozzle..............still on System #4
11/22/2016
11/22/2016
8.50
PROD2
DRILL
DRLG
P
OBD 1.5 bpm at 3,981 psi FS, BHP
9,101.0
9,410.0
00:00
08:30
4,292 psi, CWT -0.7k, WOB 2.Ok,
ROP 30, WHP 478, IA 440, OA 0
Note: Mud swap with new mud out bit
at 9,242 ft.
11/22/2016
11/22/2016
2.00
PROD2
DRILL
WPRT
P
Wiper trip to window, PUW 25k, hole
9,410.0
7,070.0
08:30
10:30
loading up, 200 ft jog at EOB, Pulling
heavy thru build from 7,820 ft, clean
thru window, Jet/Jog 5", wait for
shaker to clean up, RBI
11/22/2016
11/22/2016
0.15
PROD2
DRILL
DLOG
P
Log RA for a plus 4.0 ft correction.
7,070.0
7,429.0
10:30
10:39
11/22/2016
11/22/2016
0.75
PROD2
DRILL
WPRT
P
Wiper back in hole, clean thru build
7,429.0
9,410.0
10:39
11:24
and hole appears clean.
11/22/2016
11/22/2016
1.30
PROD2
DRILL
DRLG
P
BOBD 1.52 bpm at 4,055 psi FS, BHP
9,410.0
9,432.0
11:24
12:42
4,348 psi, CWT 6k, WOB 1.1 k, ROP
80. Lost all returns at 9,424 ft, PUW
28k, RBIH, restart 1.52 bpm at 4,055
FS, BHP 4,338 psi, CWT 6k, WOB
1.1 k, ROP 99, healing starting at
9,445 ft.
Page 21137 Report Printed: 12/27/2016
"0
Operations Summary (with Timelog Depths)
1B-18
y. e
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/22/2016
11/22/2016
5.50
PROD2
DRILL
DRLG
P
OBD 1.52 bpm at 4,055 psi FS, BHP
9,432.0
9,561.0
12:42
18:12
4,338 psi, CWT -8k, WOB 1.4k, ROP
3, hit Anchorite, slow drilling
11/22/2016
11/22/2016
1.30
PROD2
DRILL
DRLG
P
OBD 1.52 bpm at 4055 psi FS, BHP
9,561.0
9,629.0
18:12
19:30
4331, WHP 375, IA 367, OA 0
11/22/2016
11/22/2016
0.25
PROD2
DRILL
WPRT
P
200' wiper up hole, PUW
9,629.0
9,429.0
19:30
19:45
11/22/2016
11/22/2016
0.25
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW 5 k
9,429.0
9,629.0
19:45
20:00
11/22/2016
11/23/2016
4.00
PROD2
DRILL
DRLG
P
BOBD 1.52 bpm at 4055 psi FS, BHP
9,629.0
9,779.0
20:00
00:00
4350, WHP 373, IA 368, OA 6
11/23/2016
11/23/2016
0.75
PROD2
DRILL
DRLG
P
OBD 1.52 bpm at 4055 psi FS, BHP
9,779.0
9,810.0
00:00
00:45
4431, WHP 375, IA 368, OA 6
11/23/2016
11/23/2016
0.35
PROD2
DRILL
WPRT
P
Wiper up hole 1000', PUW 28 k
9,810.0
8,800.0
00:45
01:06
11/23/2016
11/23/2016
0.50
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW 9 k
8,800.0
9,810.0
01:06
01:36
11/23/2016
11/23/2016
7.95
PROD2
DRILL
DRLG
P
BOBD 1.52 bpm at 3860 psi FS, BHP
9,810.0
9,989.0
01:36
09:33
4326, WHP 359, IA 375, OA 0
11/23/2016
11/23/2016
2.00
PROD2
DRILL
WPRT
P
Wiper trip to window, PUW 27k, hole
9,989.0
7,070.0
09:33
11:33
loading up, 200 ftjog at EOB, Pulling
heavy 31 k thru build from 7,820 ft,
clean thru window, Jet/Jog 5", wait for
shaker to clean up, RBIH
11/23/2016
11/23/2016
0.25
PROD2
DRILL
DLOG
P
Log RA for a plus 4.5 ft correction.
7,070.0
7,430.0
11:33
11:48
11/23/2016
11/23/2016
0.95
PROD2
DRILL
WPRT
P
Wiper back in hole, clean thru build,
7,430.0
9,989.0
11:48
12:45
past billet and hole appears clean
RIW .
11/23/2016
11/23/2016
5.25
PROD2
DRILL
DRLG
P
BOBD 1.55 bpm at 4,100 psi FS, BHP
9,989.0
10,106.0
12:45
18:00
4,366 psi, CWT -3.7k, WOB, 1.2k,
WHP 373, IA 400, OA 0, BHA wiper at
9,949'
11/23/2016
11/24/2016
6.00
PROD2
DRILL
DRLG
P
Continue drilling ahead 1.52 bpm at
10,106.0
10,246.0
18:00
00:00
4,100 FS, BHP 4384, WHP 344, IA
461, OA 0, BHA wiper at 10,120',
10,165', 10,192', pumping beaded pills
11/24/2016
11/24/2016
3,25
PROD2
DRILL
DRLG
P
Continue drilling ahead on bottom, 1.4
10,246.0
10,299.0
00:00
03:15
bpm at 4200 psi, BHP 4371, WHP
366, IA 466, OA 0
11/24/2016
11/24/2016
0.50
PROD2
DRILL
WPRT
P
1000' Wiper up hole PUW 25 k
10,299.0
9,300.0
03:15
03:45
11/24/2016
11/24/2016
0.35
PROD2
DRILL
WPRT
P
Wiper back in hole. RIW 2 k
9,300.0
10,299.0
03:45
04:06
11/24/2016
11/24/2016
12.25
PROD2
DRILL
DRLG
P
BOBD 1.4 bpm at 3921 psi FS, BHP
10,299.0
10,688.0
04:06
16:21
4374, WHP 370, IA 436, OA 0, lots of
pick ups and beads, PUW's 25k to 27k
and clean. pump 1 0x1 0
11/24/2016
11/24/2016
2.50
PROD2
DRILL
WPRT
P
Wiper trip to window, PUW 25k, pull
10,688.0
7,410.0
16:21
18:51
up thru window jog the 5 inch up to
7,410'
11/24/2016
11/24/2016
0.25
PROD2
DRILL
DLOG
P
RIH , log the RA marker correction of
7,410.0
7,430.0
18:51
19:06
plus 5.5'
11/24/2016
11/24/2016
1.25
PROD2
DRILL
WPRT
P
Wiper back in hole RIW 1.5 k
7,430.0
10,688.0
19:06
20:21
11/24/2016
11/25/2016
3.65
PROD2
DRILL
DRLG
P
BOBD 1.35 bpm at 4060 psi FS, BHP
10,688.0
10,770.0
20:21
00:00
4470, WHP 408, IA 372, OA 0
Page 22/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC
Time Log
Start Time End Time f__Dur (hr) Phase Op Code
11/25/2016 11/25/2016 9.95 PROD2 DRILL
00:00 09:57
751PROD2 IDRILL ICIRC
109:57 110:42
11/25/2016
11/25/2016
2.10
PROD2
DRILL
WPRT
10:42
12:48
(ftKB)
End Depth (ftKB)
P
11/25/2016
11/25/2016
1.15
PROD2
DRILL
WPRT
12:48
13:57
1
liner and shorty to BHA #24, change
sweeps folowed by lots of beads and
11/25/2016
11/25/2016
0.55
PROD2
DRILL
WPRT
13:57
14:30
pumped last of beaded pill, MU Hi -vis
11/25/2016
11/25/2016
2.40
PROD2
DRILL
WPRT
14:30
16:54
10,900.0
while pumping last of beaded pill, build
11/25/2016
11/25/2016
1.60
PROD2
DRILL
TRIP
16:54
18:30
sweep.
11/25/2016
11/25/2016
0.25
PROD2
DRILL
DLOG
18:30
18:45
11/25/2016
11/25/2016
2.50
PROD2
DRILL
TRIP
18:45
21:15
(ftKB)
End Depth (ftKB)
P
11/25/2016
11/26/2016
2.75
PROD2
DRILL
DISP
21:15
00:00
1
liner and shorty to BHA #24, change
sweeps folowed by lots of beads and
11/26/2016
11/26/2016
1.00
PROD2
DRILL
TRIP
00:00
01:00
pumped last of beaded pill, MU Hi -vis
11/26/2016
11/26/2016
0.75
PROD2
DRILL
OWFF
01:00
01:45
10,900.0
while pumping last of beaded pill, build
11/26/2016
11/26/2016
1.00
PROD2
DRILL
PULD
01:45
02:45
sweep.
11/26/2016
11/26/2016
0.30
COMPZ2
CASING
PUTB
02:45
03:03
11/26/2016
11/26/2016
0.25
COMPZ2
CASING
SFTY
03:03
03:18
times, wait for returns to clean up over
111/26/2016 11/26/2016 2.95 COMPZ2 CASING PUTB
03:18 06:15
11/26/2016 11/26/2016 1 2.00 COMPZ2 CASING RUN[
06:15 08:15
Job: DRILLING SIDETRACK
P
flow
LD drilling BHA# 23
72.1
Start Depth
0.0
Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
P
OBD 1.35 bpm at 4,060 psi FS, BHP
10,770.0
10,900.0
TD, pictures are on the s:drive
4395, WHP 363, IA 367, OA 0, Lo -vis
MU Ported bullnose, 32 jts of slotted
0.0
1
liner and shorty to BHA #24, change
sweeps folowed by lots of beads and
out checks, surface test.
numerous pick ups, PUW's 28k to 31 k,
1,044.7
8
pumped last of beaded pill, MU Hi -vis
sweep
P
TD called, reciprocate pipe, PUW 28k
10,900.0
10,900.0
while pumping last of beaded pill, build
Hi/Lo vis sweeps, pump 1 0x1 0 Lo/Hi
sweep.
P
Chase sweeps to window, PUW 28k,
10,900.0
7,070.0
Jog at EOB, slow thru window 6 fpm
at 0.5 bpm.
P
Jet/log 5" from 7,370 ft to 7,070 ft 2
7,070.0
7,370.0
times, wait for returns to clean up over
shaker, pump 10x10.
P
RBIH to 8,250 ft.
7,370.0
8,250.0
P
Chase 10x10 sweeps to 5" and Jet/jog
8,250.0
72.2
5" fromm 7,370 ft to 7,070 ft, wait for
returns to clean up, continue wiper to
swab, 250 ft jog at surface.
P
Bump up, reset counters, RBIH to
72.2
6,940.0
confirm TD
P
Tie in to K1 for minus 1.0 ft correction.
6,940.0
6,980.0
Pump 1 0x1 0 sweep, jogged the build
section, jetted the 5 inch,
P
Continue RIH, bobble at 10299', TF
6,980.0
10,900.0
stops rotated, PUH, RBIH clean with
drilled TF, confirmed TD 10,900'.
P
POOH laying in12.0 ppg liner running
10,900.0
4,167.0
pill with beads, painting EOP flags at
9,800 and 6,200'
P I
Continue POOH
4.167.0
72.1
P
flow
LD drilling BHA# 23
72.1
Prep rig floor to run liner.
0.0
PJSM, to MU lower AL3 -01 liner
0.0
section
**** Note: Bit grade 8 -6 -LM -NX -1 -BT -
TD, pictures are on the s:drive
MU Ported bullnose, 32 jts of slotted
0.0
1
liner and shorty to BHA #24, change
out checks, surface test.
RIH with A113-01 lower liner assembly,
1,044.7
8
minus 6.0 ft at flag, continue RIH
0.01
712016
i; Operations Summary (with Timelog Depths)
1B-18
i i ♦ �
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
StartTime
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
operation
(MB)
End Depth (ftKB)
11/26/2016
11/26/2016
3.00
COMPZ2
CASING
RUNL
T
Stacking 8,450 ft to 8,500 ft, PUW
8,450.0
9,910.0
08:15
11:15
30k, continue RIH, stacking at 9,800
ft, attempt to work down, loosing
ground to 9,669 ft, pump .4 bpm, work
to 9,775 ft, PU 225 ft, RIH 55 fpm to
9,910 ft, PUW 35k, loosing ground
getting back to 9,900 ft, PUH, RBIH to
9,906 ft, unable to work deeper,
loosing ground to 9,880 ft, confer with
town.
11/26/2016
11/26/2016
2.50
COMPZ2
CASING
TRIP
T
POOH for BOPE test and plan
9,910.0
1,044.7
11:15
13:45
forward, PUW 36k.
11/26/2016
11/26/2016
0.50
COMPZ2
CASING
OWFF
T
On surface, monitor well for flow,
1,044.7
1,044.7
13:45
14:15
PJSM- LD BHA over dead well.
11/26/2016
11/26/2016
0.75
COMPZ2
CASING
PULD
T
LD BHA #24, prep floors.
1,044.7
1,000.2
14:15
15:00
11/26/2016
11/26/2016
3.00
COMPZ2
CASING
PULL
T
PJSM- LD shorty, 32 jts slotted and
1,000.2
0.0
15:00
18:00
bullnose.
11/26/2016
11/26/2016
2.00
COMPZ2
CASING
CTOP
T
Flush surface lines and displace coil to
0.0
0.0
18:00
20:00
fresh water, grease choke manifold
11/26/2016
11/26/2016
3.25
COMPZ2
WHDBOP
BOPE
P
Start BOP testing, test witness waived
0.0
0.0
20:00
23:15
per state tester Lou Grimadli, 3,500
psi high/250 psi low/2,500 annular
preventor. Stab INJH test inner reel
valve, stripper
11/27/2016
11/27/2016
5.00
COMPZ2
WHDBOP
BOPE
T
Continue BOP testing, test witness
0.0
0.0
00:00
05:00
waived per state tester Lou Grimaldi,
3,500 psi high/250 psi low/2,500
annular preventor flowing BOP check
list.
11/27/2016
11/27/2016
3.00
COMPZ2
CASING
CTOP
T
RD test equipment, flush surface lines
0.0
0.0
05:00
08:00
and displace coil to 12.0 ppg
completion fluid, grease choke
manifold and stack
11/27/2016
11/27/2016
1.35
COMPZ2
CASING
PULD
T
PJSM, MU Cleanout BHA #25 with a
0.0
62.4
08:00
09:21
0.8° ako motor and D331 GEB, 2.79"
no/go, MU to CoilTrak, surface test.
11/27/2016
11/27/2016
1.40
COMPZ2
CASING
TRIP
T
RIH with clean out BHA #25
62.4
6,940.0
09:21
10:45
11/27/2016
11/27/2016
0.20
COMPZ2
CASING
DLOG
T
Tie in to K1 for minus 1.5 ft correction.
6,940.0
6,973.0
10:45
10:57
11/27/2016
11/27/2016
1.65
COMPZ2
CASING
TRIP
T
Continue RIH, close EDC, PUW
6,973.0
10,900.0
10:57
12:36
above window 27k, clean thru build,
some drag just past billet, clean past
9,910 ft, (15k CWT) confirm TD again
at 10,900 ft (10k CWT)
11/27/2016
11/27/2016
0.25
COMPZ2
CASING
SFTY
T
Confirm TD again at 10,900 ft (10k
10,900.0
10,900.0
12:36
12:51
CWT) confer with town, change of
scope, will not clean out, pump new
bedaded completion fluid to surface.
PJSM- change of scope.
11/27/2016
11/27/2016
5.50
COMPZ2
CASING
CIRC
T
Reciprocate pipe, PUW 29k, while
10,900.0
10,900.0
12:51
18:21
making up 100 bbl of 12.0 ppg beaded
liner pill, 2ppb beads, 3% Safe Lube,
and pumping to mill, pulled 34.5k at
9,905
11/27/2016
11/27/2016
3.00
COMPZ2
CASING
TRIP
T
Discuss plan forward, POOH from
10,900.0
62.4
18:21
21:21
10,570' displacing wellbore to beads,
beads to surface, continue POOH
pumping pipe displacement.
Page 24137 Report Printed: 12/27/2016
e Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/27/2016
11/27/2016
0.50
COMPZ2
CASING
OWFF
T
Tag up at surface, PJSM, check well
62.4
62.4
21:21
21:51
for flow
11/27/2016
11/27/2016
0.65
COMPZ2
CASING
PULD
T
LD Cleanout BHA
62.4
0.0
21:51
22:30
11/27/2016
11/27/2016
0.50
COMPZ2
CASING
SFTY
T
Tools OOH, Prep to MU liner
0.0
0.0
22:30
23:00
assembly
11/27/2016
11/27/2016
0.75
COMPZ2
CASING
PUTB
T
MU 16 joints of slotted liner
0.0
505.6
23:00
23:45
11/27/2016
11/28/2016
0.25
COMPZ2
CASING
PULD
T
PU/MU BHI Coiltrak tools, w/ agitator
505.6
505.6
23:45
00:00
11/28/2016
11/28/2016
1.00
COMPZ2
CASING
PULD
T
Continue MU Coiltrak tools, surface
505.6
557.1
00:00
01:00
test
11/28/2016
11/28/2016
1.50
COMPZ2
CASING
RUNL
T
RIH, with AL3-01 liner running BHA#
557.1
7,364.0
01:00
02:30
26 with agitator
11/28/2016
11/28/2016
0.25
COMPZ2
CASING
RUNL
T
Correct to the 6,700' EOP flag,
7,364.0
7,450.0
02:30
02:45
continue IH
11/28/2016
11/28/2016
0.25
COMPZ2
CASING
DLOG
T
Log the K1 correction of plus 5.0'
7,450.0
7,450.0
02:45
03:00
11/28/2016
11/28/2016
0.55
COMPZ2
CASING
RUNL
T
Continue RIH to bottom, no pumps, 35
7,450.0
9,110.0
03:00
03:33
fpm, BHP 4 450 psi, annular
increasing
11/28/2016
11/28/2016
1.30
COMPZ2
CASING
RUNL
P
Continue RIH to bottom (off trouble
9,110.0
10,900.0
03:33
04:51
time) on depth at 10,900 ft, release off
liner at 1.1 bpm at 5,000 psi BHA,
PUW 25k, liner appears to be off,
reset depths.
11/28/2016
11/28/2016
3.65
COMPZ2
CASING
TRIP
P
POOH, paint flags at 8,000 ft and
10,393.0
50.3
04:51
08:30
5,000 ft
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
OWFF
P
On surface, monitor well for flow.
50.3
50.3
08:30
09:00
PJSM- LD BHA over dead well
11/28/2016
11/28/2016
0.75
COMPZ2
CASING
PULD
P
LD BHA#26, remove agitator from
50.3
0.0
09:00
09:45
BHA, lower liner in hole.
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
RURD
P
Prep floors for liner run.
0.0
0.0
09:45
10:15
11/28/2016
11/28/2016
1.40
COMPZ2
CASING
PUTB
P
PJSM- MU ported bullnose, 38 jts
0.0
1,191.9
10:15
11:39
slotted, Shorty.
11/28/2016
11/28/2016
0.85
COMPZ2
CASING
PULD
P
PJSM- MU lower liner assembly to
1,191.9
1,236.1
11:39
12:30
CoilTrak tools, surface test.
11/28/2016
11/28/2016
3.10
COMPZ2
CASING
RUNL
P
RIH with 1,192 ft AL3-01 lower middle
1,236.1
8,130.0
12:30
15:36
liner BHA #27, correct to flag minus
3.5 ft, continue RIH, PUW 25k at
7,000 ft. continue RIH
11/28/2016
11/28/2016
0.15
COMPZ2
CASING
DLOG
P
Log K1 for plus 1.5 ft,
8,130.0
8,160.0
15:36
15:45
11/28/2016
11/28/2016
0.95
COMPZ2
CASING
RUNL
P
Continue RIH, 35 fpm at -350 psi over
8,160.0
10,145.0
15:45
16:42
BHP, pumps off.
11/28/2016
11/28/2016
0.65
COMPZ2
CASING
RUNL
P
Stacking at 10,145 ft, PUW 30k, work
10,145.0
10,392.0
16:42
17:21
liner to 10,392 ft, PUW 30k, release
off liner at 1.1 bpm at 4,711 psi, BHP
4,882 psi, 775 psi Diff. PUW 22k.
reset counters.
11/28/2016
11/28/2016
3.15
COMPZ2
CASING
TRIP
P
POOH pumping beaded completion
9,200.0
44.2
17:21
20:30
fluid paint EOP flags at 8,000 ft and
6,200 ft.
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
OWFF
P
On surface, monitor well for flow.
44.2
44.2
20:30
21:00
PJSM- LD BHA over dead well
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
PULD
P
LD BHA#27
44.2
0.0
21:00
21:30
Page 25137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
18-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/28/2016
11/28/2016
0.25
COMPZ2
CASING
RURD
P
Prep floors for liner run
0.0
0.0
21:30
21:45
11/28/2016
11/28/2016
1.50
COMPZ2
CASING
PUTB
P
PJSM- MU ported bullnose, 35jts
0.0
1,090.3
21:45
23:15
slotted, 10 ft solid pup jt and Shorty.
11/28/2016
11/29/2016
0.75
COMPZ2
CASING
PULD
P
PJSM-MU number 3 liner assembly to
1,090.3
1,134.5
23:15
00:00
BHA #28, MU to CoilTrak tools
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
PULD
P
continue to MU number 3 liner
1,134.5
1,134.5
00:00
00:15
assembly to CoilTrak tools, surface
test.
11/29/2016
11/29/2016
2.00
COMPZ2
CASING
RUNL
P
RIH with 1,092 ft AL3 -01 middle liner
1,134.5
7,334.5
00:15
02:15
BHA #27
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
RUNL
P
Correct to the EOP flag, continue I H
7,334.5
8,762.0
02:15
02:30
11/29/2016
11/29/2016
1.00
COMPZ2
CASING
RUNL
P
Set down minus 10 k CTSW, minus
8,762.0
9,201.0
02:30
03:30
1.9 k DHWOB, PUW 28 k, RBIH, at 45
fpm,
11/29/2016
11/29/2016
2.00
COMPZ2
CASING
TRIP
P
Remove liner length from BHA, POOH
9,201.0
55.1
03:30
05:30
11/29/2016
11/29/2016
0.50
COMPZ2
CASING
PULD
P
Check well for flow, PJSM for laying
55.1
55.1
05:30
06:00
down settting BHA
11/29/2016
11/29/2016
1.00
COMPZ2
CASING
PULD
P
LD BHA# 28, liner setting tools
55.1
0.0
06:00
07:00
11/29/2016
11/29/2016
0.75
COMPZ2
CASING
PULD
P
PU/MU OH anchored billet
0.0
0.0
07:00
07:45
11/29/2016
11/29/2016
0.50
COMPZ2
CASING
PULD
P
Discuss with town team concerns of
0.0
0.0
07:45
08:15
current fluid in hole, w/ running an OH
Anchored Billet.
11/29/2016
11/29/2016
1.25
COMPZ2
CASING
PULD
P
PJSM, LD billet, MU cleanout BHA
0.0
62.4
08:15
09:30
with a D331.
11/29/2016
11/29/2016
3.00
COMPZ2
CASING
TRIP
P
Tag up, reset counters, surface test
62.4
6,947.0
09:30
12:30
BHI Coiltrak tools. RIH, slowly keeping
annular below 350 psi over pressure
schedule, switching to 8.8 ppg drilling
fluid, at .15 bpm, BHP 4,600 psi
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
DLOG
P
log the K1 correction of minus 2.0'
6,947.0
6,970.0
12:30
12:45
11/29/2016
11/29/2016
1.25
COMPZ2
CASING
TRIP
P
Continue RIH
6,970.0
8,090.0
12:45
14:00
11/29/2016
11/29/2016
5.50
COMPZ2
CASING
DISP
P
Jog from 8,090' to 7,150', increasing
8,090.0
8,090.0
14:00
19:30
pump rate to 0.4 bpm, BHP 4,590 psi
displacing well to 8.8 ppg used flopro.
11/29/2016
11/29/2016
2.00
COMPZ2
CASING
TRIP
P
POOH, jogging before build and inside
8,090.0
500.0
19:30
21:30
5". Chase sweep out of the hole.
11/29/2016
11/29/2016
0.50
COMPZ2
CASING
TRIP
P
Open EDC, continue POOH. Tag up
500.0
56.0
21:30
22:00
and space out.
11/29/2016
11/29/2016
1.25
COMPZ2
CASING
PULD
P
PUD BHA#29.
56.0
0.0
22:00
23:15
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
PULD
P
PU and PD BHA #30, anchored billet
0.0
0.0
23:15
23:30
assembly.
11/30/2016
11/30/2016
1.00
COMPZ2
CASING
PULD
P
Continue to PD BHA#30. Anchored
0.0
72.0
00:00
01:00
j
billet assembly.
11/30/2016
11/30/2016
1.75
COMPZ2
CASING
TRIP
P
RIH with anchored billet. SOW =
72.0
6,950.0
01:00
02:45
15KIbs
11/30/2016
11/30/2016
0.25
COMPZ2
CASING
DLOG
P
Log the K1 for a -2 ft correction.
6,950.0
6,982.0
02:45
03:00
Page 26137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
i 7
1B-18
i
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
StartTime
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/30/2016
11/30/2016
0.75
COMPZ2
CASING
TRIP
P
Close EDC at the window. Continue
6,982.0
8,105.0
03:00
03:45
running in the hole with BHA #30. Tag
up at 8105 ft. PU and repeat tag at
8105 ft.
Bring up pump and set billet at 4700
psi, anchor oriented low side. Top of
billet at 8,094 ft.
11/30/2016
11/30/2016
2.25
COMPZ2
CASING
TRIP
P
POOH with BHA#30.
8,105.0
61.0
03:45
06:00
11/30/2016
11/30/2016
2.00
COMPZ2
CASING
PULD
P
PJSM, PUD, BHA# 30
61.0
0.0
06:00
08:00
11/30/2016
11/30/2016
3.00
PRODS
DRILL
SVRG
P
Install MM parts, simops repair
0.0
0.0
08:00
11:00
hydraulic seal in cellar.
11/30/2016
11/30/2016
1.50
PRODS
DRILL
PULD
P
PJSM, PD kickoff/drilling BHA
0.0
72.1
11:00
12:30
11/30/2016
11/30/2016
1.50
PRODS
DRILL
TRIP
P
RIH w/ AL3 kickoff/drilling BHA# 31,
72.1
6,947.0
12:30
14:00
0.8 ako motor and RB HYC bi-center
bit
11/30/2016
11/30/2016
0.25
PRODS
DRILL
DLOG
P
Log the K1 marker correction minus
6,947.0
6,957.0
14:00
14:15
1.5'
11/30/2016
11/30/2016
0.25
PRODS
DRILL
TRIP
P
Continue RIH to bottom
6,957.0
8,094.0
14:15
14:30
11/30/2016
11/30/2016
5.50
PRODS
STK
KOST
P
Dry tag TOB at 8093.8', PUW 28 k
8,094.0
8,115.0
14:30
20:00
Begin milling billet. Stacking CT
weight. Pump beads to assist kicking
off. Drill off billet to 8115ft PUH, clean
dry drift through billet area.
11/30/2016
12/1/2016
4.00
PRODS
DRILL
DRLG
P
Continue drilling ahead, pumping 1.5
8,115.0
8,320.0
20:00
00:00
BPM, at 3860 psi. BHP = 4200 psi,
WHP = 498 psi. WOB 1.5-2 Klbs, ROP
= 20-70 FPH.
12/1/2016
12/1/2016
3.25
PRODS
DRILL
DRLG
P
Continue drilling ahead, pumping 1.5
8,320.0
8,490.0
00:00
03:15
BPM, at 3900 psi. BHP = 4200 psi,
WHP = 498 psi. WOB 1.5-2 Klbs, ROP
= 20-70 FPH.
12/1/2016
12/1/2016
0.25
PRODS
DRILL
WPRT
P
PUH for planned wiper trip. PUW =
8,490.0
8,110.0
03:15
03:30
26KIbs.
12/1/2016
12/1/2016
0.25
PRODS
DRILL
WPRT
P
RBIH. SOW = 13.5 Klbs
8,110.0
8,490.0
03:30
03:45
12/1/2016
12/1/2016
5.00
PRODS
DRILL
DRLG
P
BOBD, 1.4 bpm at 3,598 psi, BHP
8,490.0
8,805.0
03:45
08:45
4283, WHP 644
12/1/2016
12/1/2016
1.50
PRODS
DRILL
WPRT
P
Wiper up hole, PUW 25 k, jog the 5
8,805.0
7,393.0
08:45
10:15
inch
12/1/2016
12/1/2016
0.25
PRODS
DRILL
DLOG
P
RBIH, log the RA marker correction of
7,393.0
7,431.0
10:15
10:30
plus 3.0'.
12/1/2016
12/1/2016
0.75
PRODS
DRILL
WPRT
P
Wiper back in hole, RM 11 k
7,431.0
8,805.0
10:30
11:15
12/1/2016
12/1/2016
6.75
PRODS
DRILL
DRLG
P
BOBD, 1.53 bpm at 3,712 psi, BHP
8,805.0
9,045.0
11:15
18:00
4,396, WHP 663, IA 200, OA 0
12/1/2016
12/2/2016
6.00
PRODS
DRILL
DRLG
P
Continue drilling ahead pumping 1.55
9,045.0
9,164.0
18:00
00:00
BPM at 4250 psi. BHP 4310 psi. IA
252, OA 0.
Beginning to have weight transfer
issues. Prepare pill pit for beaded pills.
Page 27/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
r, 1B-18
f'
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
Start Depth
(ftKB)
End Depth (ftKB)
12/2/2016
12/2/2016
5.00
PRODS
DRILL
DRLG
P
Continue drilling ahead pumping 1.55
9,164.0
9,245.0
00:00
05:00
BPM at 4150 psi. BHP 4430 psi. IA
265, OA 0.
Beginning to have weight transfer
issues. Begin pumping alternating
20bbl beaded pills, followed by 20bbl
mud from the active.
BHA wipers as required to maintain
weight transfer.
12/2/2016
12/2/2016
1.25
PRODS
DRILL
WPRT
P
Wiper up hole into the 5 inch. PUW 25
9,245.0
7,393.0
05:00
06:15
12/2/2016
12/2/2016
0.25
PROD3
DRILL
WPRT
P
RIH, to log RA
7,393.0
7,404.0
06:15
06:30
12/2/2016
12/2/2016
0.25
PROD3
DRILL
DLOG
P
Log the RA marker correction of plus
7,404.0
7,431.0
06:30
06:45
3.5'
12/2/2016
12/2/2016
0.75
PROD3
DRILL
WPRT
P
Wiper back in hole, RIW 14 k
7,431.0
9,245.0
06:45
07:30
12/2/2016
12/2/2016
6.00
PROD3
DRILL
DRLG
P
BOBD 1.4 bpm at 4,029 psi FS, BHP
9,245.0
9,322.0
07:30
13:30
4272, WHP 405, IA 289, OA 0,
pumping beads, mix up 45 bbl of
tubed pill (2% of each) no advantage
seen, continue pumping beaded pills,
12/2/2016
12/2/2016
3.00
PROD3
DRILL
DRLG
P
OBD 1.4 bpm at 4,025psi, BHP 4,284,
9,322.0
9,358.0
13:30
16:30
WHP 465, IA 357, OA 0
12/2/2016
12/2/2016
2.00
PROD3
DRILL
DRLG
P
OBD with beaded pills, 40/20 beads,
9,358.0
9,384.0
16:30
18:30
22 fph, 1 k- DHWOB, 0 k- CTSW 1.4
bpm at 4,313 psi, BHP 385, WHP 414,
IA 358, OA 0
12/2/2016
12/2/2016
4.25
PROD3
DRILL
DRLG
P
Continue drilling pumping 40bbl
9,384.0
9,437.0
18:30
22:45
beaded pills followed by 20 bbls of
mud from the active.
CTW =-5KIbs, WOB = 0.8 - 1.0KIbs
BHP 4350 psi. Multiple BHA wipers
required to maintain weight transfer.
12/2/2016
12/3/20161.25
PROD3
DRILL
WPRT
P
PUH for early wiper trip. Troubleshoot
9,437.0
9,223.0
22:45
00:00
mud pump #2.
12/3/2016
12/3/2016
1.50
PROD3
DRILL
WPRT
P
Continue wiper trip to the window.
9,223.0
7,220.0
00:00
01:30
Troubleshoot MP#1 and MP#2 while
pulling to the window.
12/3/2016
12/3/2016
1.50
PROD3
DRILL
WPRT
P
Jog the 5 inch, while troubleshooting
7,220.0
7,380.0
01:30
03:00
pump issues.
12/3/2016
12/3/2016
4.00
PRODS
DRILL
SVRG
T
PJSM, fill out proper permits, Tear
7,380.0
7,380.0
03:00
07:00
down pump # 2 and replace failed
seal, clear suction screen on pump #
1, and clear suction line,
12/3/2016
12/3/2016
0.25
PROD3
DRILL
DLOG
P
RIH, Log the RA marker correction of
7,380.0
7,430.0
07:00
07:15
plus 4.0', 7,410'-7,430'
12/3/2016
12/3/2016
1.25
PROD3
DRILL
TRIP
P
Wiper back in hole, RIW 14 k
7,430.0
9,430.0
07:15
08:30
12/3/2016
12/3/2016
2.00
PROD3
DRILL
WPRT
P
Clean hole from 9,420' up to 9,210',
9,430.0
9,437.0
08:30
10:30
lowering pump rate to 0.3 bpm to RIH,
up to 1.3 bpm PUH, RIH to drill ahead.
12/3/2016
12/3/2016
5.00
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 3,558 psi, BHP
9,437.0
9,440.0
10:30
15:30
4245, WHP 355, IA 229, OA 0,
pumping beaded pills, pumping new
mud pills, Multiple BHA wipers and
PU's to help improve weight transfer.
Page 28/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/3/2016
12/3/2016
4.00
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at4,100 psi, BHP
9,440.0
9,461.0
15:30
19:30
4300, WHP 500, IA 195, OA 0,
continue to pump beaded pills,
Multiple BHA wipers and PU's to help
improve weight transfer.
12/3/2016
12/3/2016
0.75
PRODS
DRILL
WPRT
P
PUH for BHA wiper to try and improve
9,461.0
9,461.0
19:30
20:15
weight transfer. Slight overpull at 9210
ft.
12/3/2016
12/4/2016
3.75
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,100 psi, BHP
9,461.0
9,495.0
20:15
00:00
4310, WHP 570, IA 195, OA 0,
Multiple BHA wipers and PU's to help
improve weight transfer.
Swap mud. New mud at the bit at
9470 ft. New mud at surface at 9478
ft.
12/4/2016
12/4/2016
7.75
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,100 psi, BHP
9,495.0
9,555.0
00:00
07:45
4340, WHP 550, IA 227, OA 0,
Multiple BHA wipers and PU's to help
improve weight transfer.
12/4/2016
12/4/2016
0.25
PROD3
DRILL
WPRT
P
Short wiper up hole, PUW 30 k
9,555.0
9,300.0
07:45
08:00
12/4/2016
12/4/2016
0.25
PROD3
DRILL
WPRT
P
Wiper back in hole RIW 8 k
9,300.0
9,555.0
08:00
08:15
12/4/2016
12/4/2016
2.00
PROD3
DRILL
DRLG
P
BOBD 1.3 bpm at 4,100 psi, BHP
9,555.0
9,565.0
08:15
10:15
4,334, WHP 589, IA 278, OA 0
12/4/2016
12/4/2016
2.00
PRODS
DRILL
DRLG
P
OBD 1.3 bpm at 4,092 psi, BHP
9,565.0
9,577.0
10:15
12:15
4,366, WHP 611, IA 286, OA 0,
pumping beaded pills again to assist
with weight transfer.
12/4/2016
12/4/2016
1.00
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,113 psi, BHP
9,577.0
9,581.0
12:15
13:15
4379, WHP 608, IA 290, OA 0,
pumping 40 bbl beaded pill followed
by 20 bead -free mud.
12/4/2016
12/4/2016
1.10
PROD3
DRILL
WPRT
P
Wiper up hole, PUW 30 k, jog the 5
9,581.0
7,050.0
13:15
14:21
inch, 7,050'- 7390'.
12/4/2016
12/4/2016
1.75
PROD3
DRILL
TRIP
P
Discuss with town plan forward, due to
7,050.0
72.1
14:21
16:06
slow ROP, and weight transfer, POOH
for agitator.
12/4/2016
12/4/2016
2.40
PROD3
DRILL
PULD
P
Tag surface, PJSM, PUD drilling
72.1
0.0
16:06
18:30
BHA# 31.
Crew change. Prepare to function test
BOPE.
Bit grade 1 -1 -BU -A -X -I -BHA
12/4/2016
12/4/2016
1.00
PROD3
DRILL
BOPE
P
Function test BOPE. Perform post test
0.0
0.0
18:30
19:30
greasing on stack and choke valves.
12/4/2016
12/4/2016
0.75
PROD3
DRILL
SVRG
P
Service reel and injector.
0.0
0.0
19:30
20:15
12/4/2016
12/4/2016
2.25
PROD3
DRILL
PULD
P
PJSM. PU and PD BHA #32 with 0.7°
0.0
0.0
20:15
22:30
AKO motor, agitator and RB HYC bit.
12/4/2016
12/5/2016
1.50
PROD3
DRILL
TRIP
P
Bump up, reset counters, RIH. Close
0.0
4,827.0
22:30
00:00
EDC and shallow test agitator. Good
test. Continue in the hole.
12/5/2016
12/5/2016
0.50
PRODS
DRILL
TRIP
P
Continue to RIH with BHA #32.
4,827.0
6,955.0
00:00
00:30
12/5/2016
12/5/2016
0.25
PROD3
DRILL
DLOG
P
Tie-in to the K1 for no correction.
6,955.0
7,000.0
00:30
00:45
12/5/2016
12/5/2016
1.00
PROD3
DRILL
WPRT
P
Continue to RIH to bottom with BHA
7,000.0
9,581.0
00:45
01:45
#32.
I
Page 29/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/5/2016
12/5/2016
2.75
PRODS
DRILL
DRLG
P
BOBD. Pumping 1.3 bpm at 4400 psi.
9,581.0
9,600.0
01:45
04:30
BHP = 4320 psi. WOB = 0.6 Klbs.
ROP 5-8 fph.
12/5/2016
12/5/2016
8.25
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,254 psi, BHP
9,600.0
9,653.0
04:30
12:45
4,382, WHIP 573, IA 355, OA 0
12/5/2016
12/5/2016
0.25
PROD3
DRILL
WPRT
P
Short 100' BHA wiper up hole, PUW
9,653.0
9,653.0
12:45
13:00
25 k
12/5/2016
12/5/2016
2.50
PROD3
DRILL
DRLG
P
BOBD, 1.3 bpm at 4,370 psi, BHP
9,653.0
9,680.0
13:00
15:30
4,379, WHP 583, IA 334, OA 0
12/5/2016
12/5/2016
0.25
PROD3
DRILL
WPRT
P
Wiper up hole to 8,700', PUW 26 k
9,680.0
8,700.0
15:30
15:45
12/5/2016
12/5/2016
0.50
PRODS
DRILL
WPRT
P
Wiper back in hole RN 12 k
8,700.0
9,680.0
15:45
16:15
12/5/2016
12/5/2016
1.75
PRODS
DRILL
DRLG
P
BOBD 1.3 bpm at 4,330 psi, BHP
9,680.0
9,687.0
16:15
18:00
4,390, WHIP 587, IA 323, OA 0
12/5/2016
12/5/2016
0.50
PROD3
DRILL
WPRT
P
BHA Wiper. Difficulty getting back to
9,687.0
9,687.0
18:00
18:30
bottom.
12/5/2016
12/5/2016
2.00
PRODS
DRILL
DRLG
P
BOBD. 1.3 bpm at 4285 psi. BHP =
9,687.0
9,702.0
18:30
20:30
4360 psi. WOB 0-1.4 Klbs. ROP
<10fph. IA 348 psi OA = 0.
12/5/2016
12/5/2016
1.75
PROD3
DRILL
WPRT
P
PUH for wiper to the window. Pulled
9,702.0
7,400.0
20:30
22:15
heavy at 9367 ft and 9220 ft. Jog 5"
casing 2x.
12/5/2016
12/5/2016
0.25
PRODS
DRILL
DLOG
P
RBIH. Log RA for a +4 ft correction.
7,400.0
7,420.0
22:15
22:30
12/5/2016
12/5/2016
1.00
PROD3
DRILL
WPRT
P
Continue RIH. Took weight at 9207 ft,
7,420.0
9,702.0
22:30
23:30
9226 ft and 9406 ft.
12/5/2016
12/6/2016
0.50
PROD3
DRILL
DRLG
P
BOBD. 1.25 bpm at 4350 psi. BHP =
9,702.0
9,708.0
23:30
00:00
4360 psi. WOB 1.2 Klbs. ROP 15fph.
IA 348 psi OA = 0.
12/6/2016
12/6/2016
9.75
PROD3
DRILL
DRLG
P
Continue drilling ahead pumping 1.25
9,708.0
9,790.0
00:00
09:45
bpm at 4280 psi. BHP = 4340. IA
346psi, OA Opsi.
Begin pumping 20bbls beaded pills
followed by 20bbls mud from the
active.
BHA wipers as required to help
maintain weight transfer.
12/6/2016
12/6/2016
2.50
PROD3
DRILL
CIRC
P
TD called at 9790'. Wiper up hole and
9,790.0
8,870.0
09:45
12:15
circulate beaded pill out. Clean hole.
Build Hi/Lo vis sweeps.
12/6/2016
12/6/2016
1.00
PROD3
DRILL
WPRT
P
RBIH to TD at 9790'. Pump 10x10
8,870.0
9,790.0
12:15
13:15
Hi/Lo sweeps at 1.2 BPM and 4300
psi. IA 371 psi, OA 0 psi.
12/6/2016
12/6/2016
0.75
PRODS
DRILL
WPRT
P
Chase 10x10 sweep to 7060'.
9,790.0
7,060.0
13:15
14:00
Decrease rate to .5BPM through
window at 7400'. Increase rate back
to 1.3 BPM up to 7060'.
12/6/2016
12/6/2016
0.75
PRODS
DRILL
WPRT
P
RBIH past EOB to 7970'. Pump
7,060.0
7,970.0
14:00
14:45
10x10 sweep at 1.3 BPM and 4300
psi.
12/6/2016
12/6/2016
2.37
PROD3
DRILL
WPRT
P
PUH and chase sweep to window.
7,970.0
69.4
14:45
17:07
Decrease rate to .5BPM through
window at 7400'. Continue wiper to
swab.
12/6/2016
12/6/2016
1.64
PRODS
DRILL
TRIP
P
RBIH to confirm TD.
69.4
6,944.0
17:07
18:45
12/6/2016
12/6/2016
0.24
PROD3
DRILL
DLOG
P
Log for K1 Marker and make
6,944.0
6,980.2
18:45
19:00
correction of + .5 ft.
Page 30/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
Start Depth
(ftKB)
End Depth (ftKB)
12/6/2016
12/6/2016
1.22
PRODS
DRILL
TRIP
P
Continue RIH to confirm
6,980.2
9,788.0
19:00
20:13
TD.............slight tag at 9,226 ft and
9,476 ft ..... confirmed TD is at 9,788 ft.
12/6/2016
12/7/2016
3.78
PRODS
DRILL
DISP
P
Start PUH and laying in liner running
9,788.0
78.1
20:13
00:00
pill which is 12 ppg Potassium
Formate with 2 ppg beads after pill
reaches the bit......... Paint
flags .......... at window and KWF with
beads is being laid in while
POOH...........
12/7/2016
12/7/2016
1.20
PRODS
DRILL
OWFF
P
At surface. Prep for flow check and
78.1
78.1
00:00
01:12
1
then perform a 30 minute flow check.
12/7/2016
12/7/2016
0.64
PRODS
DRILL
PULD
P
L/D BHA # 32.
78.1
0.0
01:12
01:50
Note: Bit Graded Out at 1 - 1 - bu - a -
x- i-ct-td
12/7/2016
12/7/2016
3.83
COMPZ3
CASING
PULD
P
PJSM and begin M/U 49 jts of liner.
0.0
1,545.6
01:50
05:40
PIU BHA #33 w/liner running
assembly.
12/7/2016
12/7/2016
2.00
COMPZ3
CASING
RUNL
P
RIH with BHA #33 and 49 jts of slotted
1,545.6
8,100.0
05:40
07:40
liner w/ non=ported bullnose. Tie in to
at flag for -5' correction. PUW 26K.
Continue RIH clean through window
and build section.
12/7/2016
12/7/2016
2.00
COMPZ3
CASING
RUNL
P
Start stacking weight at 8410', begin
8,100.0
9,787.0
07:40
09:40
working liner assembly down. Work
liner by varying speeds and pump
rates through tight spots at 8410',
8456', 8704', 8798', 8934', & 8976'.
Heavy PU weights throughout. Work
liner down to TD at 9787.4' pumping
min rate. PUW 30K. Stack down
WOB -8.5K. Release lower liner
assembly at 9785' pumping 1.2 BPM,
PUW 25K. Reset counter. TOL at
8284'.
12/7/2016
12/7/2016
2.90
COMPZ3
CASING
TRIP
P
POOH and paint window flag at 6644'.
9,787.0
43.9
09:40
12:34
Continue POOH pumping across top.
12/7/2016
12/7/2016
0.60
COMPZ3
CASING
OWFF
P
At surface. Prep for flow check and
43.9
0.0
12:34
13:10
then perform a 30 minute flow check.
Good.
12/7/2016
12/7/2016
2.50
COMPZ3
CASING
PULD
P
L/D BHA#33 over dead well. PJSM
0.0
705.8
13:10
15:40
and begin M/U 21 jts of liner. P/U BHA
#34 w/liner running assembly.
12/7/2016
12/7/2016
1.88
COMPZ3
CASING
RUNL
P
RIH w/ BHA#34 and 21 jts slotted liner
705.8
8,284.0
15:40
17:33
w/ ported bullnose.
12/7/2016
12/7/2016
0.33
COMPZ3
CASING
RUNL
P
Tag top of liner at 8,284 ft. PUH for a
8,284.0
7,620.0
17:33
17:52
weight check and then tag again.
Bring pump online and release off of
upper liner assembly. Top of liner now
at 7,620 ft.
12/7/2016
12/7/2016
5.70
COMPZ3
CASING
TRIP
P
PUH slowly and start to displace well
7,620.0
33.5
17:52
23:34
with 8.7 drilling fluid through the
GS...............pumping slow due to
annular pressure ....................after well
has been swapped over to drilling
fluid, pump a Hi / Lo sweep and chase
up to the 5" and make several jogs
and then chase sweep to surface.......
Page 31137 Report Printed: 12127/2016
Operations Summary (with Timelog Depths)
)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
12/7/2016
12/8/2016
0.43
COMPZ3
CASING
TRIP
P
At surface. PJSM and then begin
33.5
33.5
23:34
00:00
Pressure Undeploy Operations.
12/8/2016
12/8/2016
0.80
COMPZ3
CASING
PULD
P
Pressure undeploy BHA # 34.
33.5
33.5
00:00
00:48
12/8/2016
12/8/2016
0.19
COMPZ3
CASING
PULD
P
L/D BHA#34.
33.5
0.0
00:48
00:59
12/8/2016
12/8/2016
0.30
COMPZ3
CASING
PULD
P
P/U BHA #35 w/Anchored Billet
0.0
72.9
00:59
01:17
j
12/8/2016
12/8/2016
1.35
COMPZ3
CASING
PULD
P
Pressure deploy BHA #35.
72.9
72.9
01:17
02:38
12/8/2016
12/8/2016
1.70
COMPZ3
CASING
TRIP
P
RIH w/anchored billet
72.9
6,950.0
02:38
04:20
12/8/2016
12/8/2016
0.19
COMPZ3
CASING
DLOG
P
Log K1 Marker and make a correction
6,950.0
6,980.0
04:20
04:31
of-1 ft
12/8/2016
12/8/2016
0.20
COMPZ3
CASING
TRIP
P
Continue RIH w/Anchored Billet
6,980.0
7,620.6
04:31
04:43
12/8/2016
12/8/2016
0.39
COMPZ3
CASING
TRIP
P
Tag top of liner at 7,620.6
6,620.6
6,609.6
04:43
05:07
ft ............ release off of billet with no
issues.. ............ TOB is at 7,608.6 ft.
12/8/2016
12/8/2016
1.50
COMPZ3
CASING
TRIP
P
POOH
6,609.6
72.9
05:07
06:37
12/8/2016
12/8/2016
1.00
COMPZ3
CASING
PULD
P
PJSM and PUD BHA# 35.
72.9
72.9
06:37
07:37
12/8/2016
12/8/2016
0.75
COMPZ3
CASING
PULD
P
L/D BHA#35
72.9
0.0
07:37
08:22
12/8/2016
12/8/2016
0.75
COMPZ3
CASING
PULD
P
P/U BHA#36
0.0
0.0
08:22
09:07
12/8/2016
12/8/2016
1.00
PROD4
DRILL
PULD
P
PJSM, PD kickoff/drilling BHA #36
0.0
72.2
09:07
10:07
12/8/2016
12/8/2016
1.55
PROD4
DRILL
TRIP
P
RIH w/ AL2 kickoff/drilling BHA# 36,
72.2
6,949.0
10:07
11:40
2.0 AKO motor and RB HCC bi-center
bit
12/8/2016
12/8/2016
0.23
PROD4
DRILL
DLOG
P
Log K1 marker for -1 ft. correction.
6,949.0
6,976.0
11:40
11:54
12/8/2016
12/8/2016
0.50
PROD4
DRILL
TRIP
P
Continue RIH.
6,976.0
7,610.0
11:54
12:24
12/8/2016
12/8/2016
1.10
PROD4
STK
KOST
P
Dry tag TOB at 7610', PUW 27K.
7,610.0
7,640.0
12:24
13:30
Begin milling billet, drill off billet to
7640'. PUH to 7582'. Dry drift clean
past billet area. No issues.
12/8/2016
12/8/2016
5.83
PROD4
DRILL
DRLG
P
Continue drilling ahead, pumping 1.3
7,640.0
7,981.0
13:30
19:19
BPM, at 3900 psi. BHP = 4200 psi,
WHP = 430 psi. WOB -1-1.5 Klbs,
ROP -50-80 FPH
12/8/2016
12/8/2016
1.59
PROD4
DRILL
W PRT
P
Having weight transfer
7,981.6
7,981.6
19:19
20:55
issues.............pump a 5 x 5 sweep
and chase up hole to 5.....jog this
area several times to clean up and
then RBIH
Note: Increased amount of cuttings
seen across shaker after wiper
12/8/2016
12/9/2016
3.08
PROD4
DRILL
DRLG
P
BOBD, pumping 1.4 BPM, at 4036 psi.
7,981.6
7,999.0
20:55
00:00
BHP = 4100 psi, WHP = 366 psi.
WOB -1-2.4 Klbs, ROP -8 to 10 FPH
Page 32/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
operation
Start Depth
(WB)
End Depth (ftKB)
12/9/2016
12/9/2016
8.30
PROD4
DRILL
DRLG
P
Drilling ahead in 16-18 AL2 Build
7,999.0
8,054.0
00:00
08:18
section, pumping 1.4 BPM, at 4142
psi. BHP = 4100 psi, WHP = 500 psi.
WOB -2 - 2.9 Klbs, ROP -8 to 10
FPH
Note: Got back confirmed samples of
Ankorite at 01:15hrs
12/9/2016
12/9/2016
3.40
PROD4
DRILL
DRLG
P
Pump 5x5 sweep. PUW 26K.
8,054.0
8,085.0
08:18
11:42
Continue drilling ahead in build
section. ROP picking up to -10-
20FPH, 1.3 BPM, at 4000 psi, BHP
4200, WHP 415, WOB 2.5 Klbs.
12/9/2016
12/9/2016
0.10
PROD4
DRILL
SRVY
P
PU for geo survey. PUW 26K. Lower
8,085.0
8,068.0
11:42
11:48
pump rate to 1 BPM. Obtain clean
geo survey.
12/9/2016
12/9/2016
3.50
PROD4
DRILL
DRLG
P
BOBD, 1.3 BPM, 4100 psi, WHP 420,
8,068.0
8,090.0
11:48
15:18
BHP 4200, WOB 1.2KIbs, ROP -10
FPH, IA 383, OA 0. Pumping 5x5
sweeps and pick ups as needed.
12/9/2016
12/9/2016
0.50
PROD4
DRILL
DRLG
P
Drilled ahead to EOB at 8102.58 ft.
8,090.0
8,102.6
15:18
15:48
12/9/2016
12/9/2016
1.50
PROD4
DRILL
WPRT
P
Pumped final 10x10 sweep. Chased
8,102.6
72.9
15:48
17:18
to 7060. Decrease rate to .3 BPM
through window. RBIH and jog 5"
casing from 7040'-8090'. Continue
chase sweep out of hole.
12/9/2016
12/9/2016
1.68
PROD4
DRILL
PULD
P
PJSM and begin pressure undeploy
72.9
72.9
17:18
18:58
BHA #36
12/9/2016
12/9/2016
1.00
PROD4
DRILL
PULD
P
L/D BHA #36
72.9
0.0
18:58
19:58
12/9/2016
12/9/2016
2.02
PROD4
WHDBOP
BOPE
P
Prep (Stab back on well with nozzle
0.0
0.0
19:58
22:00
and jet on stack several times, grease
stack, etc.) for BOPE test.
12/9/2016
12/10/2016
2.00
PROD4
WHDBOP
BOPE
P
Start full bi-weekly BOPE test. Test
0.0
0.0
22:00
00:00
witness waived by Jeff Jones,
AOGCC.
12/10/2016
12/10/2016
5.00
PROD4
WHDBOP
BOPE
P
Complete full bi-weekly BOPE test
0.0
0.0
00:00
05:00
250 psi/3500 psi including inner reel
valve (6 hour test). No test failures.
12/10/2016
12/10/2016
1.12
PROD4
DRILL
CTOP
P
PJSM and prep to cut coil and perform
0.0
0.0
05:00
06:07
slack management. Remove CTC,
boot end of wire to seal for slack
management.
12/10/2016
12/10/2016
6.78
PROD4
DRILL
CTOP
P
Cut 1,600' of coil and 1,612' of eline.
0.0
0.0
06:07
12:54
Install boot end of wire and heat shrink
wrap. Perform slack management.
Cut an additional 100' of coil (Cut
1,700' total of coil and 1,612' total of
eline).
12/10/2016
12/10/2016
4.50
PROD4
DRILL
CTOP
P
Prep coil and re -head CTC, pull test
0.0
0.0
12:54
17:24
50k, re -head, install UQC, PIT 4,500
psi, displace coil to drilling fluid.
12/10/2016
12/10/2016
2.60
PROD4
DRILL
PULD
P
P/U BHA # 37 ( AL2 Lateral Drilling
0.0
72.8
17:24
20:00
BHA) and presure deploy
Page 33/37 Report Printed: 12127126-1-6
Operations Summary (with Timelog Depths)
IB -18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/10/2016
12/10/2016
1.00
PROD4
DRILL
EQRP
T
After pressure deploying and ready to
72.8
72.8
20:00
21:00
RIH, lost power to
tools ........... pressure undeploy,
troubleshoot, repair and pressure
deploy again.
Note: Problem was 1/4" of the eline at
the UQC was found to have been
scrapped bare and was shorting out.
Wire cut and reheaded.
12/10/2016
12/10/2016
1.40
PROD4
DRILL
TRIP
P
RIH with EDC open pumping at 1 bpm
72.8
6,950.0
21:00
22:24
to facilitate pushing slack forward.
12/10/2016
12/10/2016
0.22
PROD4
DRILL
DLOG
P
Log for K1 Marker and make
6,950.0
6,973.0
22:24
22:37
correction of minus 2 ft.
12/10/2016
12/10/2016
0.61
PROD4
DRILL
TRIP
P
Continue RIH (closed the EDC at
6,973.0
8,102.0
22:37
23:13
7,350 ft)
12/10/2016
12/11/2016
0.78
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.4 bpm Circ
8,102.0
8,172.0
23:13
00:00
Press 4,077 WHP 379 BHP
4,223 WOB 1.6 klb ROP 64 to
88 fph
12/11/2016
12/11/2016
4.00
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.4 bpm Circ
8,172.0
8,326.7
00:00
04:00
Press 4,077 WHP 379 BHP
4,223 WOB 1.6 klb ROP 64 to
88 fph
Note: Around 8,320 ft ROP slowed
drastically .......... Geo thinks it's the
fault...........
12/11/2016
12/11/2016
0.38
PROD4
DRILL
WPRT
P
Perform a 300 ft wiper trip to help
8,326.7
8,326.7
04:00
04:22
alliviate weight transfer
issues..............we are either in
ankorite or at the fault or
both..............we have pumped several
sweeps prior to PUH
12/11/2016
12/11/2016
4.41
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.5 bpm Circ
8,326.7
8,332.0
04:22
08:47
Press 4,215 WHP 437 BHP
4,259 WOB 1.0 klb ROP 1 to 2
FPH. PU's as needed.
12/11/2016
12/11/2016
5.39
PROD4
DRILL
DRLG
P
ROP averaging 2-4 FPH. Drilling
8,332.0
8,347.1
08:47
14:10
ahead, 1.5 BPM, Circ 4100 psi, WHP
342 psi, BHP 4210 psi, WOB 1.5-2
klbs.
12/11/2016
12/12/2016
9.83
PROD4
DRILL
DRLG
P
Continue drilling ahead at 3-5 FPH,
8,347.1
8,378.4
14:10
00:00
1.4 BPM, Circ 4115 PSI, WHP 250
psi, BHP 4149 psi, WOB 1-3 klbs.
12/12/2016
12/12/2016
8.00
PROD4
DRILL
DRLG
P
Continue drilling ahead at 3-5 FPH,
8,378.4
8,400.0
00:00
08:00
1.4 BPM, Circ 4115 PSI, WHP 250
psi, BHP 4149 psi, WOB 1-3 klbs.
PU's and restarts as needed.
12/12/2016
12/12/2016
0.90
PROD4
DRILL
DRLG
P
Swap to mud system #8 (8.65 ppg
8,400.0
8,400.0
08:00
08:54
PowerPro SF) with new mud at the bit
at 8,400 ft and continue drilling ahead.
12/12/2016
12/12/2016
6.30
PROD4
DRILL
DRLG
P
Continue drilling ahead 3-5 FPH, 1.5
8,400.0
8,414.0
08:54
15:12
BPM, Circ 3950 psi, WHP 505, BHP
4140 psi, WOB 2-3 Klbs. PU's and
restarts as needed. Adjust trip
schedule holding 11.8 ppg at window
to help with losses Geo samples
continue to show —15% ankorite.
Page 34/37 Report Printed: 12/27/2016
t;'Xa
Operations Summary (with Timelog Depths)
IB -18
i=
Rig: NABORS CDR2-AC
Job: DRILLING SIDETRACK
Time Log
Start Time
12/12/2016
End Time
12/12/2016
our (hr)
4.28
Phase
PROD4
Op Code
DRILL
Activity Code
Time P-T-XStart
operation
Depth
(ftKB)
End Depth (WB)
15:12
19:28
DRLG
p
Continue drilling ahead -2-4 FPH, 1.5
8,414.0
8,421.2
BPM, Circ 4000 psi, WHP 500, BHP
4140 psi, WOB 2-3 Klbs. PU's and
restarts as needed.
12/12/2016
19:28
12/12/2016
19:52
0.40
PROD4
DRILL
TRIP
P
Discuss with town and decision made
8,421.2
8,200.0
to POOH for new motor and bit. PUW
26K.
12/12/2016
19:52
12/12/2016
2.00
PROD4
DRILL
TRIP
P
Pump 5x5 sweep and chase to
8,200.0
71.6
21:52
window at 7,393', Jog 5" casing from
7,060' to 7,373'. POOH w/ open EDC.
12/12/2016
12/12/2016
1.00
PROD4
DRILL
PULD
P
PJSM, PUD 13HA#37.
71.6
21:52
22:52
Bit grade 7-5-bt-a-x-i-ct-pr
71.6
12/12/2016
22:52
12/12/2016
0.60
PROD4
DRILL
PULD
P
M/U BHA# 38 w/ Weatherford .5° AKO
71.6
71.6
23:28
motor and a SRFE3408MB7 HYC bit.
12/12/2016
12/13/2016
0.52
PR0D4
DRILL
PULD
P
PJSM and start PD BHA#38.
71.6
23:28
00:00
71.6
12/13/2016
12/13/2016
0.40
PROD4
DRILL
PULD
P
Completed pressure deploying
71.6
71.6
00:00
00:24
BHA#38 w/.5° AKO Weathford motor
and a SRFE3408MB7 HYC bit.
12/13/2016
12/13/2016
1.40
PROD4
DRILL
TRIP
P
RIH with open EDC pumping at
71.6
00:24
01:48
minimum rate
6,945.0
12/13/2016
01:48
12/13/2016
02:04
0.27
PROD4
DRILL
DLOG
P
Log K1 Marker and make correction of
6,945.0
6,973.0
minus 2 ft
12/13/2016
02:04
12/13/2016
0.49
PROD4
DRILL
TRIP
P
Continue RIH with now closed EDC
6,973.0
8,422.0
02:33
pumping minimum rate.
12/13/2016
02:33
12/13/2016
04:06
1.55
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.41 bpm Circ =
8,422.0
8,446.0
4,248 WHP = 562 CTW = 13.66
ROP = 7 fph WOB = 2.24 klb
Note: Experiencing some severe
vibration issues once on bottom
drilling.........
Note: Aftyer 10 minutes on bottom
drilling, computer screens for DD goes
pink,,,,,,,,,, PUH and re -boot
computers ......... RBIH and continue
drilling .... 5 minute delay.
12/13/2016
04:06
12/13/2016
07:22
3.27
PROD4
DRILL
DRLG
P
Pumping at 1.39 bpm Circ = 4,078
8,446.0
8,510.0
WHP = 560 CTW = 6.30 ROP = 24
to 75 fph WOB = 2.24 klb
Note: We seemed to have broke
through
after 8,440 ft. This is wher we
had our last stall and now the ROP is
increasing
12/13/2016 12/13/2016
07:22
1.80
PROD4
DRILL
WPRT
P
After 0700 hr morning meeting
8,568.0
7,080.0
09:10
engineer
called and due to faulting
into
the Miluveach Formation, pump a
10
x 10 sweep and chase up hole ( jog
5"
several times ) and hopefully by
that
time twon will have a decision on
a
way forward (plug back or run liner).
PUH
and pump a 10 x 10 sweep and
chase
up hole once out of bit. PUW =
27
k.............Having issue with choke
periodically
clogging ........... more clay
coming
across shaker now ....... make
several
jogs in 5"
Page 35/37 Ponnrf Prinfo.f• 1919719nac
Time Log
Rig:
Operations Summary (with Timelog Depths)
1B-18
NABORS CDR2-AC Job:
DRILLING SIDETRACK
Start Time
12/13/2016
End Time
12/13/2016
Dur (hr) Phase
1.10 PROD4
op Code
DRILL
Activity Code Time P-T-XStart
operation
Depth
(ftKB)
End Depth (ftKB)
09:10
10:18
TRIP P
Another call from town and instructed
7,080.0
8,542.0
once completing jogs in 5", RBIH and
pump another sweep and chase up
hole again as above whilst meetings
are being held on AL2 Lateral's
status.......
12/13/2016
10:16
12/13/2016
13:37
3.34 PROD4
DRILL
TRIP P
BOB. After 5 x 5 exits bit plus a few
8,542.0
72.8
bbls, chase up hole, jog through 5"
again and chase to surface.
Note: Town called again and decision
made to run liner.
12/13/2016
13:37
12/13/2016
15:00
1.38 PROD4
DRILL
TRIP P
At surface, RBIH to called TD to start
72.8
laying in liner running pill and then
6,948.0
KW F............
12/13/2016
15:00
12/13/2016
15:13
0.23 PROD4
DRILL
DLOG P
Log the K1 Marker and make a
6,948.0
correction of minus 2 ft
6,992.0
12/13/2016
15:13
12/13/2016
16:09
0.92 PROD4
DRILL
TRIP P
Continue RIH to 8,230 ft ..............
6,992.0
8,230.0
12/13/2016
16:09
12/13/2016
18:30
2.35 PR0D4
DRILL
DISP P
After liner running pill gets to the bit
8,230.0
and above, start PUH and laying in pill
72.8
and then KW F. Paint flags at 6,900 ft
and 6,000 ft, continue laying in
beaded liner pill to surface.
12/13/2016
18:30
12/13/2016
0.50 PROD4
DRILL
OWFF P
On surface, monitor well for flow,
19:00
PJSM- LD BHA over open hole.
72.8
72.8
12/13/2016
12/13/2016
0.85 PROD4
DRILL
PULD P
LD BHA 938
19:00
19:51
72.8
0.0
19:51 016
19:51
12/13/2016
0.65 COMPZ4
CASING
PUTS P
Prep floors for liner run. PJSM-
20:30
running liner
0.0
0.0
12/13/2016
20:30
12/13/2016
1.95 COMPZ4
CASING
PUTB P
MU AL2 liner assembly- bullnose, 21
22:27
0.0
1,202.2
jts slotted, Halliburton swell packer, 17
jts solids, 6 ft SBR deployment sleeve.
BOP drill. Clean floors.
12/13/2016
22.27
12/13/2016
23.21
0.90 COMPZ4
CASING
PUTB P
PJSM-MU AL2 liner assembly to BHA
1,202.2
1,246.4
#39, MU to CoilTrac tools, surface
test.
12/13/2016
23:21
12/14/2016
0.65 C0MPZ4
CASING
RUNL P
KIM with AL2 liner assembly
1,246.4
00:00
y
3,990.0
12/14/2016
00:00
12/14/2016
01:24
1.40 COMPZ4
CASING
RUNL P
Continue RIH, tie in at flag for minus
3,990.0
8,196.0
3.04 ft, PUW 26k, continue RIH, stack
at 8,058 ft, work liner down to 8,196 ft,
PUW 28k, WOB -2.7k,
12/14/2016
01:24
12/14/2016
01:36
0.20 COMPZ4
CASING
RUNL P
Release off liner at 1.3 bpm, PUW
P
8,196.0
6,994.0
23k, WOB 2.6k, reset counters to bit
depth. Mid element of swell packer at
7,535 ft, TOP of SBR at 6,994 ft.
12/14/2016
01:36
12/14/2016
03:48
2.20 COMPZ4
CASING
DISP P
Displace well to seawater, LRS on
6, 994.0
6,994.0
site, PJSM with LRS
12/14/2016
03:48
12/14/2016
04:48
1.00 Z4
CASING
TRIP P
POOH pumping seawater to 2,500 ft.
6,994.0
2,500.0
LRS PIT lines and equipment.
12/14/2016
04:48
12/14/2016
06:00
1.20 Z4
ECOMPZ4
CASING
FRZP P
2,500 ft. LRS pump 30 bbis diesel,
2,500.0
500.0
RDMO LRS. Open EDC at 500 ft
12/14/2016
12/14/2016
0.25
CASING
TRIP P
Continue POOH
06:00
06:15
500.0
42.8
12/14/2016
06:15
2016
1.40 COMPZ4
CASING
PULD P
At surface, tagged u Pressure
gg P.
42.8
E12/14/2016
Undeploy after PJSM.
42.8
12/14/2016
0.35 COMPZ4
CASING
PULD P
LID BHA # 39.07:39
42.8
0.0
Page 36/37
Report Printed: 12/27/2016
h 9
Operations Summary (with Timelog Depths)
IB -18
Rig:
NABORS CDR2-AC
Job:
DRILLING SIDETRACK
Time Log
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
Start Depth
(ftKB)
End Depth (ftKB)
12/14/2016
12/14/2016
1.00
DEMOB
WHDBOP
MPSP
P
Prep for BPV installment.
0.0
0.0
08:00
09:00
12/14/2016
12/14/2016
2.00
DEMOB
WHDBOP
MPSP
P
Valve Crew shows up and installs
0.0
0.0
09:00
11:00
BPV
12/14/2016
12/14/2016
5.00
DEMOB
WHDBOP
DISP
P
Pump corrosion Inhibitor through coil
0.0
0.0
11:00
16:00
and then blow down coil.
12/14/2016
12/14/2016
2.00
DEMOB
WHDBOP
RURD
P
Start rig move check list, blow down
0.0
0.0
16:00
18:00
steam lines, disconnect PUTZ,
remove mouse holes, etc....
12/14/2016
12/14/2016
2.00
DEMOB
WHDBOP
NUND
P
ND BOPE, torque checked, remove
0.0
0.0
18:00
20:00
kill and deployment lines.
***Rig released at 20:00 on
12/14/2016.
Page 37/37
Report Printed:
12127126-1-6
sConocoPhillip
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1B Pad
1 B-18AL2
50-029-22472-61
Baker Hughes INTEQ
Definitive Survey Report
20 December, 2016
FIA a I
BAKER
HUGHES
- ConocoPhillips U/F1I
ConocoPhillips Definitive Survey Report HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft j
Well:
113-18
North Reference:
True
Wellbore:
1 B-18AL2
Survey Calculation Method:
Minimum Curvature
3 Design:
1 B-18AL2
Database:
EDM Alaska NSK Sandbox
Project
Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS)
Using Well Reference Point
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Well
IB -18
Well Position
+N/ -S 0.00 usft
Northing:
5,969,647.06 usft
Latitude:
70° 19'40.248 N
+E/ -W 0.00 usft
Easting:
550,148.90 usft
Longitude:
149° 35' 35.868 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
usft
Ground Level:
61.20 usft
Wellbore
1 B-18AL2
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
(nT)
BGG M2016 10/1/2016
18.01
80.96
57,551
r
Design
1 B-18AL2
Audit Notes:
Version:
1.0 Phase: ACTUAL
Tie On Depth:
7,590.41
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(usft)
(°)
40.80
0.00
0.00
290.00
Survey Program
Date 12/16/2016
From
To
Survey
Survey
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
Start Date
End Date
469.67
6,897.50 1 B-18 (1 B-18)
MWD
MWD - Standard
4/28/1994
4/28/1994
s
7,392.00
7,590.41 1B-18AL3PB1 (1B-18AL3PB1)
MWD
MWD - Standard
11/5/2016
11/11/2016
7,610.00
8,505.30 1 B-18AL2 (1 B-18AL2)
MWD
MWD - Standard
12/7/2016
12/13/2016
12120/2016 9:04:29AM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Well 1B-18
Project:
Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft
Well:
IB -18
North Reference:
True
Wellbore:
1 B-18AL2
Survey Calculation
Method:
Minimum Curvature
Design:
1 B-18AL2
Database:
EDM Alaska NSK Sandbox
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
DLS
(usft)
(I
(I
(usft)
(usft)
(usft)
(usft)
Northing
Easting
(°/100')
Section
Survey Tool Name
Y
(ft)
(ft)
(ft)
7,590.41
67.65
148.25
6,705.52
6,603.52
-2,593.48
-238.02
5,967,052.29
549,928.24
43.82
-663.36
MVVD (2)
7,610.00
)
70.34
139.57
6,712.56
6,610.56
-2,608.24
-227.25
5,967,037.62
549,939.11
43.57
-678.52
MWD (3)
7,641.58
84.44
144.00
6,719.44
6,617.44
-2,632.40
-208.27
5,967,013.58
549,958.25
46.69
-704.63
MWD (3)
7,670.73
93.69
151.40
6,719.91
6,617.91
-2,657.00
-192.72
5,966,989.09
549,973.96
40.62
-727.65
MWD
(3)
7,700.83
100.93
160.10
6,716.08
6,614.08
-2,684.17
-180.46
5,966,962.01
549,986.40
37.41
-748.46
MWD (3)
7,730.48
i
97.67
172.62
6,711.27
6,6D9.27
-2,712.54
-173.59
5,966,933.68
549,993.46
43.09
-764.62
MWD (3)
7,760.63
94.30
184.58
6,708.11
6,606.11
-2,742.46
-172.87
5,966,903.77
549,994.38
41.00
-775.53
MWD (3)
y 7,790.76
6
89.91
196.57
6,707.00
6,605.00
-2,771.99
-178.39
5,966,874.20
549,989.06
42.34
-780.45
MWD (3)
7,820.78
91.38
209.44
6,706.66
6,604.67
-2,799.57
-190.10
5,966,846.56
549,977.54
43.15
-778.88
MWD (3)
7,850.81
88.59
222.08
6,706.67
6,604.67
-2,823.88
-207.61
5,966,822.13
549,960.19
43.10
-770.74
MWD (3)
& 7,880.40
89.11
234.64
6,707.27
6,605.27
-2,843.50
-229.67
5,966,802.36
549,938.26
42.47
-756.71
MWD (3)
£tl 7,910.51
89.60
247.40
6,707.61
6,605.61
-2,858.06
-255.96
5,966,787.63
549,912.08
42.41
-736.99
MWD (3)
7,940.43
94.73
256.83
6,706.48
6,604.48
-2,867.23
-284.37
5,966,778.27
549,883.73
35.85
-713.43
MWD (3)
7,965.13
92.24
265.80
6,704.97
6,602.97
-2,870.95
-308.71
5,966,774.39
549,859.41
37.62
-691.83
MWD (3)
7,995.15
95.66
271.67
6,702.90
6,600.90
-2,871.61
-338.64
5,966,773.53
549,829.50
22.59
-663.93
MWD (3)
8,025.40
94.80
286.17
6,700.13
6,598.13
-2,866.95
-368.31
5,966,777.99
549,799.79
47.82
-634.45
MWD (3)
8,056.09
89.69
297.27
6,698.93
6,596.93
-2,855.62
-396.75
5,966,789.13
549,771.29
39.78
-603.86
MWD (3)
8,085.87
90.52
310.1D
6,698.87
6,596.87
-2,839.14
-421.48
5,966,805.45
549,746.45
43.17
-574.98.
MWD (3)
8,116.15
86.25
316.88
6,699.72
6,597.72
-2,818.32
-443.42
5,966,826.11
549,724.37
26.45
-547.25
MWD (3)
8,145.85
86.62
319.10
6,701.57
6,599.57
-2,796.30
-463.26
5,966,848.00
549,704.39
7.56
-521.07
MWD (3)
8,175.49
87.61
318.67
6,703.06
6,601.06
-2,774.00
-482.72
5,966,870.17
549,684.78
3.64
-495.15
MWD (3)
8,205.40
87.11
317.34
6,704.44
6,602.44
-2,751.79
-502.71
5,966,892.24
549,664.64
4.75
-468.77
MWD (3)
8,235.43
8
90.06
318.21
6,705.18
6,603.18
-2,729.56
-522.88
5,966,914.33
549,644.32
10.24
-442.22
MWD (3)
- 8,265.82
92.21
317.58
6,704.58
6,602.58
-2,707.02
-543.25
5,966,936.73
549,623.80
7.37
-415.36
MWD (3)
8,297.17
93.01
315.98
6,703.15
6,601.15
-2,684.20
-564.70
5,966,959.41
549,602.21
5.70
-387.41
MWD (3)
8,325.09
93.01
313.19
6,701.69
6,599.69
-2,664.63
-584.56
5,966,978.84
549,582.22
9.98
-362.06
MWD (3)
8,355.13
90.77
313.62
6,700.70
6,598.70
-2,644.00
-606.37
5,966,999.32
549,560.28
7.59
-334.50
MWD (3)
g 6,365.09
87.24
313.87
6,701.22
6,599.22
-2,623.29
-628.00
5,967,019.88
549,538.50
11.81
-307.09
MWD (3)
8,414.21
85.42
311.97
6,703.08
6,601.08
-2,603.50
-649.28
5,967,039.53
549,517.10
9.03
-280.32
MWD (3)
8,445.45
86.13
309.74
6,705.38
6,603.38
-2,583.13
-672.85
5,967,059.75
549,493.40
7.47
-251.21
MWD (3)
Annotation
TIP
KOP
Hal
BAKER
HUGHES
12120/2016 9:04:29AM Page 3 COMPASS 5000.1 Build 74
V"
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Project: Kuparuk River Unit
TVD Reference:
Site: Kuparuk 1 B Pad
MD Reference:
Well: 1 B-18
North Reference:
Wellbore: 1 B-18AL2
Survey Calculation Method:
Design: 1 B-18AL2
Database:
Survey
Well 1 B-18
1 B-18 @ 102.00usft
1 B-18 @ 102.00usft
True
Minimum Curvature
EDM Alaska NSK Sandbox
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Map
Map
DLS
Vertical
(usft)
(°)
(°)
(usft
(usft )
(usft)
(usft)
Northing
Easting
(°/100')
Section
Survey Tool Name Annotation
(ft)
(ft)
(ft)
8,475.30
88.43
308.35
6,706.80
6,604.80
-2,564.35
-696.00
5,967,078.37
549,470.12
9.00
-223.03
MWD (3)
8,505.30
90.64
307.21
6,707.04
6,605.04
-2,545.97
-719.71
5,967,096.59
549,446.29
8.29
-194.47
MWD (3)
8,568.00
90.64
307.21
6,706.34
6,604.34
-2,508.05
-769.64
5,967,134.16
549,396.11
0.00
-134.58
PROJECTED to TO
riRI
BAKER
HUGHES
12/20/2016 9:04:29AM Page 4 COMPASS 5000.1 Build 74
THE STATE
01ALASKA
GOVERNOR BILL WALKER
Jason Burke
CTD Coordinator
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gw
�. r j
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1B-18AL2
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 216-110
Surface Location: 500' FNL, 292' FEL, SEC. 9, TI IN, RI OE, UM
Bottomhole Location: 2322' FNL, 2323' FEL, SEC. 9, TI IN, RI OE, UM
Dear Mr. Burke:
Enclosed is the approved application for permit to re -drill the above referenced development
well.
The permit is for a new wellbore segment of existing well Permit No. 216-108, API No. 50-029-
22472-01-00. Production should continue to be reported as a function of the original API
number stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval
required by law from other governmental agencies and does not authorize conducting drilling
operations until all other required permits and approvals have been issued. In addition, the
AOGCC reserves the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the
Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to
comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska
Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result
in the revocation or suspension of the permit.
Sincerely,
Cathy . Foerster
Chair
DATED this �_ day of September, 2016.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
ILL20 AAC 25.005
RECEIVED
AUG 3 12016
1a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas ❑
Service - WAG ❑ Service - Disp
1c. Specify if well is proposed for:
Drill D Lateral [� Stratigraphic Test ❑ Development - Oil Q ` Service - Winj ❑ Single Zone �PmCoalbed
Gas ❑ Gas Hydrates ❑
Redrill L Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑
Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket Q « Single Well ❑
11. Well Name and Number:
ConocoPhillips Alaska Inc
Bond No. 59552180,
V,9.L) 1B-18AL2 .
3. Address:
6. Proposed Depth: Y11141
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 9575' ° TSD� 6453'
Kuparuk River Field / Kuparuk Oil Pool
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
Surface: 500' FNL, 292' FEL, Sec 9, T11 N, R10E, UM
ADL 25648 °
Top of Productive Horizon:
8. Land Use Permit:
13. Approximate Spud Date:
2952' FNL, 554' FEL, Sec 9, T11 N, R10E, UM
ALK 466
9/20/2016
9. Acres in Property:
14. Distance to Nearest Property:
Total Depth:
2322' FNL, 2323' FEL, Sec 9, T11 N, R10E, UM
2560
21220'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 102 •
15. Distance to Nearest Well Open
Surface: x- 550147 y- 5969648 Zone -4.
GL Elevation above MSL (ft): 61.2 ®
Ito Same Pool: 285' (1 B-15AL3)
16. Deviated wells: Kickoff de feet 40
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 100 degrees .
Downhole: 3005 ° Surface: 2347-
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade Coupling Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.7# L-80 ST -L 2535'
7040' 6331' 9575' 6453' N/A
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):
Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
7824' 6941'
7809' 6929'
Casing Length Size
Cement Volume MD TVD
Conductor/Structural 78' 16"
200 sx ASI 121' 121'
Surface 4215' 7-5/8"
650 sx ASIII, 300 sx G 4256' 4148'
Intermediate
Production 7783' 5"x5.5"
210 sx G 7809' 6929'
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
7131' - 7194', 7246'-7575'
6400'-6448', 6507-6741'
20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 220 AAC 25.050 requirements❑)
21. Verbal Approval: Commission Representative:
Date e_40
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Mike Callahan - 263-4180
be deviated from without prior written approval.
Contact
Email mike.callahan(a)con.com
Printed Name Jason Burke
Title CTD Coordinator
Signature
Phone 265-6097 Date
Commission Use Only
Permit to Drill
API Number:
Permit Approval
See cover letter for other
Number:0
50- -
-(
Date:
��
`�
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methan , gas hydrates, or gas contained in shales:
Other:
C�al� tis t to �s�v 5�/c,
Samples req'd: Yes ❑ No[] Mud log req'd: Yes❑ No[Z
rL/If
ajures: Yes No,❑-/ Directional svy req'd: Yes[Z No
�h lG prC V, e, �ls 7[a
Z��/S?�
Spacing
ex�eptioyvFeq'd: Yes ❑ No FJ Inclination -only svy req'd: Yes❑ Not
Post initial injection MIT req'd: Yes❑ No�
APPROVED BY
Approved by:
Q
COMMISSIONER THE COMMISSION Date:
/ VTL -7115-116, Submit Form and
Form 10-401 (Revised 11/2015) This permit is valid for 24 months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate
ORIGINAL
ConocoPhiili s
p
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
August 31, 2016
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
AUG 3 1 2016
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill 3 laterals out of the Kuparuk Well 1 B-
18 using the coiled tubing drilling rig, Nabors CDR2-AC or CDR3-AC.
Attached to this application are the following documents:
— 10-401 Applications for 1 B-1 8A, 1 B-18AL1, and 1 B-18AL2
— Detailed Summary of Operations
— 10-401 Applications for 1 B-1 8A, 1 B-18AL1, and 1 B-18AL2
— Current 1 B-18 Schematic
— Proposed CTD Schematic
If you have any questions or require additional information, please contact me at 907-263-4180.
Sincerely,
f -
Mike Callahan
ConocoPhillips Alaska
Coiled Tubing Drilling Engineer
Kuparuk CTD Laterals NABORSALASKA
Drilling
1�Wells 1 B 8A9 1
B i Nt " I n AP
CanomPhilfps
Application
.•I. -o.. _ Permit .. Document
1.
Well Name and Classification........................................................................................................ 2
(Requirements of 20 AAC 25.005 and 20 AAC 25.005(b))
........................ 2
2.
Location Summary..........................................................................................................................
2
(Requirements of 20 AAC 25.005(c)(2))..................................................................................................................................................
2
3.
Blowout Prevention Equipment Information.................................................................................
2
(Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2
4.
Drilling Hazards Information and Reservoir Pressure
.................................................................. 2
(Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................
2
5.
Procedure for Conducting Formation Integrity tests................................................................... 2
(Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2
6.
Casing and Cementing Program.................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(6)) .................. -.................................................................................................
............................. 3
7.
Diverter System Information.......................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................
3
8.
Drilling Fluids Program.................................................................................................................. 3
(Requirements of 20 AAC 25.005(c)(8))..................................................................................................................................................
3
9.
Abnormally Pressured Formation Information.............................................................................
4
(Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................
4
10.
Seismic Analysis ................................... ........................................................:..............................
... 4
(Requirements of 20 AAC 25.005(c)(10)).................................................................
.... --..... ......... ........ ....................... .................. ..... ...4
11.
Seabed Condition Analysis............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11)) ......... ............ ......... --................. .................
........ ........ ................ ...,.................................... .... 4
12.
Evidence of Bonding......................................................................................................................
4
(Requirements of 20 AAC 25.005(c)(12)) .......... ....... ............... ........... --.......
........... ......... .............................................................. ........ 4
13.
Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13)). ......... .....................................................................................................................................
4
Summaryof Operations...................................................................................................................................................4
LinerRunning...................................................................................................................................................................6
14.
Disposal of Drilling Mud and Cuttings..........................................................................................
6
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................
6
15.
Directional Plans for Intentionally Deviated Wells....................................................................... 6
(Requirements of 20 AAC 25.050(b))....................................................................................................................................................-
6
16. Attachments....................................................................................................................................6
Attachment 1: Directional Plans for 16-18A, 1 B-18AL1 & 1 B-18AL2 laterals..................................................................6
Attachment 2: Current Well Schematic for 1 B-18............................................................................................................6
Attachment 3: Proposed Well Schematic for 1 B-1 8A, 1 B-18AL1 & 1 B-18AL2 laterals...................................................6
Page 1 of 6 March 8, 2016
1. Well Name and Classification
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))
The proposed laterals described in this document are 1 B-1 8A, 1 B-18AL1, and 1 B-18AL2. All laterals will be
classified as production wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface
and subsurface coordinates of the 1 B-1 8A, 1 B-18AL1, and 1 B-1 SAI -2.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c) (3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR2-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the
maximum formation pressure in the area of 3005 psi in 18-04 (i.e. 9.0 ppg EMW)'the maximum
potential surface pressure in 1 B-18, assuming a gas gradient of 0.1 psi/ft, would be 2347 psi./ See
the "Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 1 B-18 was measured to be 2640 psi (7.7 ppg EMW) on 9/3/2012. The
maximum downhole pressure in the 1 B-18 vicinity is to the south in the 1 B-04 injector at 3005 psi (9.0 ppg
EMW) from November of 2014. The 1 B-18AL2 sidetrack will be drilled to the west and could encounter
formation pressure from 113-04.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
Wells on 1 B pad have injected gas, so there is a chance of encountering free gas while drilling the 1 B-18
laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank
away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 1 B-18 laterals will be shale instability across faults and at zonal
interfaces. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with
fault crossings and interfaces.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 1 B-18 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity
test is not required.
Page 2 of 6 March 17, 2016
6. Casing and Cementing Program
(Requirements of 20 AA 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
MD
MD
TVDSS
TVDSS
Category
OD
(ppi)
Grade
Connection
Top MD
2-3/8", 4.7#, L-80, ST -L slotted liner;
1B -18A
8900'
11,400'
6513'
6458'
aluminum billet on top
62.5
H-40
Welded
0'
121'
2-3/8", 4.7#, L-80, ST -L slotted liner;
1 B-18AL1
7500'
11300'
6480'
6477'
deployment sleeve on top
L-80
LTC
0'
4256'
0'
2-3/8", 4.7#, L-80, ST -L slotted liner;
1B-18AL2
7040'
9575'
6229'
6453'
deployment sleeve on top
Existing Casing/Liner Information
7. Diverter System Information
(Requirements of 20 AA 25.005(c)(7))
Nabors CDR2-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AA 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR2-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Chloride -based FloVis mud 7(8 6 ppg)
— Drilling operations: Chloride -based FloVis mud (8.6 ppg). This mud weight may not hydrostatically
overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide
formation over -balance and well bore stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the 1 B-18 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 March 17, 2016
Weight
Top
Btm
Burst
Co llapse
Category
OD
(ppi)
Grade
Connection
Top MD
Btm MD
TVD
TVD
psi
psi
Conductor
16"
62.5
H-40
Welded
0'
121'
0'
121'
1640
670
Surface
7-5/8"
29.7
L-80
LTC
0'
4256'
0'
4148'
6890
4790
Production
5-1/2"
17.0
L-80
TC -II
0'
7030'
0'
6325'
7960
6290
Tie -Back
Production
5"
18.0
L-80
LTC MOD
7030'
7809'
6325'
6929'
10140
10500
Tubin
3-1/2"
9.2
L-80
IBTM
0'
6930'
0'
6251'
10160
10530
7. Diverter System Information
(Requirements of 20 AA 25.005(c)(7))
Nabors CDR2-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AA 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR2-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Chloride -based FloVis mud 7(8 6 ppg)
— Drilling operations: Chloride -based FloVis mud (8.6 ppg). This mud weight may not hydrostatically
overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide
formation over -balance and well bore stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the 1 B-18 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 March 17, 2016
Pressure at the 1B-18 Window (7505' MD. 6584' ND) Using MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program .
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 1B-18 is a Kuparuk A/C -sand producer equipped with 3-1/2" tubing and 5-1/2" production
casing. The CTD sidetrack will utilize three laterals to target the A4 sand to the north, south, and west of
1B-18.
Prior to CTD operations, the existing A -sand and C -sand perforations will be squeezed with cement and a
whip -stock will be set to kickoff out of the 5" casing.
Following the pre -rig work, Nabors CDR2-AC will move in and drill three laterals targeting the A4 Sand.
The first two laterals will be drilled from one window, and the third from a second window just above the
first. All three laterals will be completed with 2-3/8" slotted liner from TD with the second and third lateral
liner tops located inside the mother bore.
The 1B -18A northeastern lateral will exit the 5" casing at 7505' MD and TD at 11400' MD, targeting the
A4 sand. It will be completed with 2-3/8" slotted liner from TD up to 8900'MD with an aluminum billet
for kicking off the 1B-18ALL
The 1B-18AL1 lateral will kickoff the billet at 8900' and drill to the east to a TD of 11300' MD targeting
the A4 sand. 4It will be completed with 2-3/8" slotted liner from TD up to 7500' MD, back into the mother
bore with a deployment sleeve.
Page 4 of 6 March 17, 2016
Pumps On 1.5 bpm)
Pumps Off
A -sand Formation Pressure (7.7 pp
2640 psi
2640 psi
Mud Hydrostatic (8.6 ppg)
2945 psi
2945 psi
Annular friction (i.e. ECD, 0.090 psi/ft)
675 psi
0 psi
Mud + ECD Combined
no chokepressure)
3620 psi
2945 psi
Target BHP at Window 11.8 pip
4040 psi
4040 psi
Choke Pressure Required to Maintain
Target S:MP
420 psi
1095 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program .
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 1B-18 is a Kuparuk A/C -sand producer equipped with 3-1/2" tubing and 5-1/2" production
casing. The CTD sidetrack will utilize three laterals to target the A4 sand to the north, south, and west of
1B-18.
Prior to CTD operations, the existing A -sand and C -sand perforations will be squeezed with cement and a
whip -stock will be set to kickoff out of the 5" casing.
Following the pre -rig work, Nabors CDR2-AC will move in and drill three laterals targeting the A4 Sand.
The first two laterals will be drilled from one window, and the third from a second window just above the
first. All three laterals will be completed with 2-3/8" slotted liner from TD with the second and third lateral
liner tops located inside the mother bore.
The 1B -18A northeastern lateral will exit the 5" casing at 7505' MD and TD at 11400' MD, targeting the
A4 sand. It will be completed with 2-3/8" slotted liner from TD up to 8900'MD with an aluminum billet
for kicking off the 1B-18ALL
The 1B-18AL1 lateral will kickoff the billet at 8900' and drill to the east to a TD of 11300' MD targeting
the A4 sand. 4It will be completed with 2-3/8" slotted liner from TD up to 7500' MD, back into the mother
bore with a deployment sleeve.
Page 4 of 6 March 17, 2016
,pq...III, Mill5III
r -t
The 113-18AL2 western lateral will exit the 5" casing at 7460' MD and TD at 9575' MD, targeting the A4
sand. It will be completed with 2-3/8" slotted liner from TD back into the tubing tail at 7040'MD with a
deployment sleeve.
Pre -CTD Work
1. RU Slickline: Dummy off gas lift mandrels, tag PBTD, obtain SBBP
2. RU Pumping: Swap hole over to diesel and perform injectivity test
3. RU Service Coil: Lay in cement plug and squeeze off the A/C -sand perforations. Let cement
harden, pressure test cement and under -ream cement down to 7525' MD.
4. RUE -line: Set whip -stock at 7505' MD
5. Prep site for Nabors CDR2-AC and set BPV.
Rig Work
1. MIRU Nabors CDR2-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 1B -18A Sidetrack (A4 sand - Northeast)
i. Mill 2.80" window at 7505' MD
ii. Drill 3" bi-center lateral to TD of 11400' MD.
iii. Run 2%" slotted liner with an aluminum billet from TD up to 8900' MD.
3. 1B-18AL1 Lateral (A4 sand - East)
i. Kick off of the aluminum billet at 8900' MD.
ii. Drill 3" bi-center lateral to TD of 11300' MD.
iii. Run 2%" slotted liner with deployment sleeve from TD back into mother bore.
4. 113-18AL2 Lateral (A4 sand - Wast)
i. Mill 2.80" window at 7460' MD.
ii. Drill 3" bi-center lateral to TD of 9575' MD.
iii. Run 2%" slotted liner with deployment sleeve from TD back into tubing tail.
5. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CRD2-AC.
Post -Rig Work
1. Pull BPV
2. Obtain SBBP
3. Install gas lift design
4. Return to production
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
Page 5 of 6 March 17, 2016
IK
.�.. ,� :, L • R' BY-IMUS •-
— Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
— The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
— The 1 B-18 laterals will be displaced to an overbalanced fluid (11.8 ppg NaBr) prior to running liner. See
"Drilling Fluids" section for more details.
— While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for
emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew
conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will
provide secondary well control while running 2-3/8" liner.
14.. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification, (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
— The Applicant is the only affected owner.
— Please see Attachment 1: Directional Plans
— Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
— MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
— Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name Distance
IB -18A
17730'
1 B-18AL1
18680'
1 B-18AL2
21220'
— Distance to Nearest Well within Pool
Lateral Name
Distance
Well
1 B-1 8A
155'
113-171-1
1 B-18AL1
315'
113-17
1 B-18AL2
285'
1 B-15AL3
16.Attachments
Attachment 1: Directional Plans for IB -18A, 1 B-18AL1 & 1 B-18AL2 laterals
Attachment 2: Current Well Schematic for 1B-18
Attachment 3: Proposed Well Schematic for 1B -18A, 1B-18AL1 & 1B-18AL2laterals
Page 6 of 6 March 17, 2016
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 113 Pad
113-18
1 B-18AL2
Plan: 1 B-18AL2_wp02
Standard Planning Report
16 August, 2016
WE PW--'
BAKER
HUGHES
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 B-18
Mean Sea Level
1 B-18 @ 102,00usft
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
FtAr.s
NUER
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Project:
Kuparuk River Unit
Site:
Kuparuk 18 Pad
Well:
113-18
Wellbore:
1 B-18AL2
Design:
1 3-18AL2_wp02
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 B-18
Mean Sea Level
1 B-18 @ 102,00usft
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
FtAr.s
NUER
8/16/2016 1:16:17PM Page 2 COMPASS 5000.1 Build 74
Site
Kuparuk
1 B Pad
Site Position:
Northing:
5,969,646.72
usft
Latitude:
70° 19'40.290 N
From:
Map
Easting:
549,457.40
usft
Longitude:
149° 35'56.056 W
Position Uncertainty:
0.00 usft
Slot Radius:
0.000 in
Grid Convergence:
0.38 °
Well
113-18
Well Position
+N/ -S
0.00
usft Northing:
5,969,647.06 usft Latitude:
70° 19'40.248 N
+El -W
0.00
usft Easting:
550,148.90 usft Longitude:
149° 35' 35.868 W
Position Uncertainty
0.00
usft Wellhead Elevation:
usft Ground Level:
61.20 usft
Welfbore
1 B-18AL2
Magnetics
Model Name
Sample Date
Declination
Dip Angle
Field Strength
(nT)
BG G M 2016
10/1/2016
18.01
80.96
57,551
Design
18-18AL2_wp02
Audit Notes:
Version:
Phase:
PLAN
Tie On Depth:
7,423.00
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(usft)
(I
_61.20
0.00
0.00
300.00
Plan Sections
Measured
TVD Below
Dogleg
Build Turn
Depth Inclination
Azimuth
System
+N/ -S
+E/ -W
Rate
Rate Rate
TFO
(usft) (°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft) (°/100ft)
(°) Target
7,423.00
39.50
191.92
6,520.41
-2,452.03
-258.71
0.00
0.00
0.00
0.00
7,460.00
39.07
191.92
6,549.04
-2,474.96
-263.55
1.16
-1.16
0.00
180.00
7,485.00
42.13
194.53
6,568.03
-2,490.79
-267.28
14.00
12.25
10.43
30.00
7,617.47
91.00
218.06
6,619.73
-2,593.35
-323.30
40.00
36.89
17.77
30.00
7,695.00
92.40
249.06
6,617.37
-2,638.83
-384.89
40.00
1.81
39.98
87.00
7,845.00
96.40
309.13
6,604.69
-2,616.49
-525.80
40.00
2.66
40.05
84.00
7,995.00
95.38
298.63
6,589.26
-2,533.44
-649.50
7.00
-0.68
-7.00
-95.00
8,095.00
95.34
305.66
6,579.91
-2,480.51
-733.75
7.00
-0.04
7.03
90.00
8,170.00
100.27
307.48
6,569.72
-2,436.26
-793.41
7.00
6.57
2.43
20.00
8,245.00
96.23
310.87
6,558.96
-2,389.38
-850.92
7.00
-5.38
4.52
140.00
8,320.00
95.75
316.13
6,551.13
-2,338.05
-905.01
7.00
-0.64
7.01
95.00
8,475.00
89.48
307.26
6,544.04
-2,235.23
-1,020.47
7.00
-4.04
-5.72
-125.00
8,800.00
87.59
284.58
6,552.46
-2,094.13
-1,310.76
7.00
-0.58
-6.98
-95.00
8,900.00
90.00
278.00
6,554.56
-2,074.57
-1,408.74
7.00
2.40
-6.58
-70.00
9,275.00
90.00
304.25
6,554.60
-1,940.58
-1,755.48
7.00
0.00
7.00
90.00
9,575.00
90.00
283.25
6,554.62
-1,820.42
-2,028.53
7.00
0.00
-7.00
-90.00
8/16/2016 1:16:17PM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 1B-18
Company:
ConocoPhillips (Alaska) Inc. -Kupl
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
North Reference:
True
Well:
1 B-18
Survey Calculation Method:
Minimum Curvature
Wellbore:
1 B-18AL2
Measured
Design:
1 B-18AL2_wp02
8/16/2016 1:16:17PM Page 3 COMPASS 5000.1 Build 74
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N/ -S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(o)
(o)
(usft)
(usft)
(usft)
(usft)
(°/100ft)
(1)
(usft)
(usft)
7,423.00
39.50
191.92
6,520.41
-2,452.03
-258.71
-1,001.97
0.00
0.00
5,967,193.59
549,906.61
TIP
7,460.00
39.07
191.92
6,549.04
-2,474.96
-263.55
-1,009.24
1.16
180.00
5,967,170.64
549,901.93
KOP
7,485.00
42.13
194.53
6,568.03
-2,490.79
-267.28
-1,013.92
14.00
30.00
5,967,154.78
549,898.30
End 14
dls, Start 40 dls
7,500.00
47.40
198.60
6,578.67
-2,500.90
-270.30
-1,016.36
40.00
30.00
5,967,144.65
549,895.34
7,600.00
84.42
215.71
6,619.03
-2,579.40
-312.83
-1,018.78
40.00
27.11
5,967,065.87
549,853.34
7,617.47
91.00
218.06
6,619.73
-2,593.35
-323.30
-1,016.69
40.00
19.70
5,967,051.85
549,842.97
4
7,695.00
92.40
249.06
6,617.37
-2,638.83
-384.89
-986.09
40.00
87.00
5,967,005.97
549,781.70
5
7,700.00
92.61
251.05
6,617.15
-2,640.53
-389.58
-982.88
40.00
84.00
5,967,004.24
549,777.01
7,800.00
95.80
291.04
6,609.51
-2,638.82
-487.25
-897.44
40.00
84.09
5,967,005.29
549,679.35
7,845.00
96.40
309.13
6,604.69
-2,616.49
-525.80
-852.89
40.00
87.14
5,967,027.37
549,640.65
End 40
dls, Start 7 dls
7,900.00
96.05
305.28
6,598.73
-2,583.44
-569.34
-798.65
7.00
-95.00
5,967,060.13
549,596.89
7,995.00
95.38
298.63
6,589.26
-2,533.44
-649.50
-704.23
7.00
-95.42
5,967,109.58
549,516.41
7
8,000.00
95.38
298.98
6,588.79
-2,531.04
-653.87
-699.26
7.00
90.00
5,967,111.95
549,512.03
8,095.00
95.34
305.66
6,579.91
-2,480.51
-733.75
-604.80
7.00
90.03
5,967,161.95
549,431.81
8
8,100.00
95.67
305.78
6,579.43
-2,477.60
-737.79
-599.85
7.00
20.00
5,967,164.82
549,427.75
8,170.00
100.27
307.48
6,569.72
-2,436.26
-793.41
-531.01
7.00
20.01
5,967,205.79
549,371.87
9
8,200.00
98.66
308.85
6,564.79
-2,417.97
-816.68
-501.72
7.00
140.00
5,967,223.92
549,348.48
8,245.00
96.23
310.87
6,558.96
-2,389.38
-850.92
-457.77
7.00
140.22
5,967,252.28
549,314.05
10
8,300.00
95.88
314.73
6,553.15
-2,352.22
-891.04
-404.44
7.00
95.00
5,967,289.16
549,273.68
8,320.00
95.75
316.13
6,551.13
-2,338.05
-905.01
-385.26
7.00
95.41
5,967,303.24
549,259.63
11
8,400.00
92.52
311.54
6,545.36
-2,282.81
-962.55
-307.82
7.00
-125.00
5,967,358.09
549,201.73
8,475.00
89.48
307.26
6,544.04
-2,235.23
-1,020.47
-233.86
7.00
-125.33
5,967,405.27
549,143.49
12
8,500.00
89.33
305.52
6,544.30
-2,220.40
-1,040.60
-209.02
7.00
-95.00
5,967,419.97
549,123.27
8,600.00
88.73
298.54
6,546.00
-2,167.41
-1,125.31
-109.16
7.00
-94.98
5,967,472.39
549,038.21
8,700.00
88.15
291.56
6,548.73
-2,125.11
-1,215.81
-9.63
7.00
-94.86
5,967,514.08
548,947.43
8,800.00
87.59
284.58
6,552.46
-2,094.13
-1,310.76
88.08
7.00
-94.67
5,967,544.42
548,852.30
13
8,900.00
90.00
278.00
6,554.56
-2,074.57
-1,408.74
182.72
7.00
-70.00
5,967,563.32
548,754.20
14
9,000.00
90.00
285.00
6,554.57
-2,054.64
-1,506.67
277.49
7.00
90.00
5,967,582.59
548,656.14
9,100.00
90.00
292.00
6,554.58
-2,022.93
-1,601.44
375.43
7.00
90.00
5,967,613.67
548,561.17
9,200.00
90.00
299.00
6,554.59
-1,979.90
-1,691.64
475.06
7.00
90.00
5,967,656.09
548,470.69
9,275.00
90.00
304.25
6,554.60
-1,940.58
-1,755.48
550.00
7.00
90.00
5,967,694.98
548,406.60
15
9,300.00
90.00
302.50
6,554.60
-1,926.83
-1,776.35
574.95
7.00
-90.00
5,967,708.59
548,385.64
9,400.00
90.00
295.50
6,554.60
-1,878.37
-1,863.76
674.88
7.00
-90.00
5,967,756.46
548,297.92
9,500.00
90.00
288.50
6,554.61
-1,840.93
-1,956.42
773.84
7.00
-90.00
5,967,793.28
548,205.02
9,575.00
90.00
283.25
6,554.62
-1,820.42
-2,028.53
846.55
7.00
-90.00
5,967,813.30
548,132.78
Planned TD at 9575.00
8/16/2016 1:16:17PM Page 3 COMPASS 5000.1 Build 74
r ConocoPhillips reAk.
ConocoPhillips Planning Report BAKER
HUGHES
Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference:
Company: ConocoPhillips (Alaska) Inc. -Kupl TVD Reference:
Project: Kuparuk River Unit MD Reference:
Site: Kuparuk 1B Pad North Reference:
Well: 1 B-18 Survey Calculation Method:
Wellbore: 1 B-18AL2
Design: 1 B-18AL2_wp02
Well 1B-18
Mean Sea Level
1 B-18 @ 102.00usft
True
Minimum Curvature
-10,402.891,139,470.72
Targets
1,689,553.00
70° 3' 54.292 N 140° 26'26.838 W
Target Name
N, -258.71 E)
hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing
Easting
Shape (°) (°) (usft) (usft) (usft) (usft)
(usft) Latitude
Longitude
1B-18AL2_T06 0.00 0.00 6,543.00 -10,106.231,139,076.65 5,967,155.00
1,689,157.00 70° 3'57.752 N
140° 26'36.772 W
plan misses target center by 1139361.07usft at 7423.00usft MD (6520.41 TVD, -2452.03 N, -258.71 E)
5,966,931.00
1,689,483.00
Point
plan misses target center by 1139687.13usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
1B-18AL2_T01 0.00 0.00 6,621.00 -10,465.041,139,791.34 5,966,801.00
1,689,874.00 70° 3' 53.217 N
140° 26' 17.984 W
plan misses target center by 1140078.21 usft at 7423.00usft MD (6520.41 TVD, -2452.03 N, -258.71 E)
Point
1 B-18AL2_Fault2
1B-18AL2_T02 0.00 0.00 6,605.00 -10,498.681,139,586.09 5,966,766.00
1,689,669.00 70° 3' 53.193 N
140° 26'23.968 W
plan misses target center by 1139873.20usft at 7423.00usft MD (6520.41 TVD, -2452.03 N, -258.71 E)
70° 3'57.920 N 140° 26'36.753 W
plan misses target center by 1139359.07usft at 7423.00usft MD (6520.41 TVD, -2452.03
Point
113-18AL2_T05 0.00 0.00 6,559.00 -10,233.671,139,290.83 5,967,029.00
1,689,372.00 70° T56.200 N
140° 26'31.227 W
plan misses target center by 1139576.10usft at 7423.00usft MD (6520.41 TVD, -2452.03 N. -258.71 E)
Point
6,544.00
0.00 0.00
113-18AL2 T03
0.00 0.00 6,590.00
-10,402.891,139,470.72
5,966,861.00
1,689,553.00
70° 3' 54.292 N 140° 26'26.838 W
plan misses target center by 1139757.16usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
Point
113-18AL2 T04
0.00 0.00 6,580.00
-10,332.421,139,401.18
5,966,931.00
1,689,483.00
70° 3' 55.079 N 1400 26'28.513 W
plan misses target center by 1139687.13usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
Point
1 B-18AL2_Fault2
0.00 0.00 6,544.00
-10,089.211,139,074.77
5,967,172.00
1,689,155.00
70° 3'57.920 N 140° 26'36.753 W
plan misses target center by 1139359.07usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
Polygon
Point 1
6,544.00
0.00 0.00
5,967,172.00
1,689,155.00
Point
6,544.00
1.00 1.00
5,967,173.01
1,689,155.99
1 B-18 CTD Polygon We:
0.00 0.00 0.00
-10,296.511,139,714.46
5,966,969.00
1,689,796.00
700 T54.967 N 140° 26' 19.445 W
- plan misses target center by 1140018.80usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
- Polygon
Point 1
0.00
0.00 0.00
5,966,969.00
1,689,796.00
Point
0.00
-62.75 -38.42
5,966,906.00
1,689,758.00
Point
0.00
379.20 -626.56
5,967,343.97
1,689,166.98
Point
0.00
841.09 -1,657.62
5,967,798.91
1,688,132.96
Point
0.00
504.23 -1,684.86
5,967,461.91
1,688,107.97
Point
0.00
91.89 -735.48
5,967,055.96
1,689,059.99
Point?
0.00
-343.01 -155.29
5,966,624.99
1,689,643.02
Point 8
0.00
-371.98 -9.47
5,966,597.00
1,689,789.02
Point
0.00
-334.76 108.79
5,966,635.01
1,689,907.01
Point 10
0.00
-213.54 227.61
5,966,757.01
1,690,025.01
Point 11
0.00
-81.92 287.49
5,966,889.01
1,690,084.00
Point 12
0.00
0.00 0.00
5,966,969.00
1,689,796.00
1B-18AL2 T07
0.00 0.00 6,555.00
-9,992.291,138,788.38
5,967,267.00
1,688,868.00
70° 3' 59.282 N 140° 26'44.484 W
plan misses target center by 1139072.04usft at 7423,00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
Point
1B-18AL2 T08
0.00 0.00 6,555.00
-9,681.601,138,093.37
5,967,573.00
1,688,171.00
70° 4' 3.320 N 140° 27'2.923 W
plan misses target center by 1138375.04usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
Point
1B-18AL2_Faultl
0.00 0.00 6,589.00
-10,399.831,139,461.74
5,966,864.00
1,689,544.00
70° 3' 54.335 N 140° 26'27.080 W
plan misses target center by 1139748.16usft at 7423.00usft MD (6520.41 TVD, -2452.03
N, -258.71 E)
Polygon
Point 1
6,589.00
0.00 0.00
5,966,864.00
1,689,544.00
Point
6,589.00
1.00 1.00
5,966,865.01
1;689,544.99
8/16/2016 1:16:17PM
Page 4
COMPASS 5000.1 Build 74
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 113-18
Mean Sea Level
1 B-18 @ 102.00usft
True
Minimum Curvature
rel .t
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Project:
Kuparuk River Unit
Site:
Kuparuk 1 B Pad
Well:
1B-18
Wellbore:
1 B-18AL2
Design:
1 B-18AL2_wp02
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 113-18
Mean Sea Level
1 B-18 @ 102.00usft
True
Minimum Curvature
rel .t
BAKER
HUGHES
8/16/2016 1: 16 17P Page 5 COMPASS 5000.1 Build 74
Casing Points
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft)
Name
(in)
(in)
9,575.00
6,554.62
2 3/8"
2.375
3.000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
7,423.00
6,520.41
-2,452.03
-258.71
TIP
7,460.00
6,549.04
-2,474.96
-263.55
KOP
7,485.00
6,568.03
-2,490.79
-267.28
End 14 dls, Start 40 cls
7,617.47
6,619.73
-2,593.35
-323.30
4
7,695.00
6,617.37
-2,638.83
-384.89
5
7,845.00
6,604.69
-2,616.49
-525.80
End 40 dls, Start 7 cis
7,995.00
6,589.26
-2,533.44
-649.50
7
8,095.00
6,579.91
-2,480.51
-733.75
8
8,170.00
6,569.72
-2,436.26
-793.41
9
8,245.00
6,558.96
-2,389.38
-850.92
10
8,320.00
6,551.13
-2,338.05
-905.01
11
8,475.00
6,544.04
-2,235.23
-1,020.47
12
8,800.00
6,552.46
-2,094.13
-1,310.76
13
8,900.00
6,554.56
-2,074.57
-1,408.74
14
9,275.00
6,554.60
-1,940.58
-13755.48
15
9,575.00
6,554.62
-1,820.42
-2,028.53
Planned TD at 9575.00
Survey Tool Program
Date 8/16/2016
From To
(usft) (usft)
Survey (Wellbore)
Tool Name
Description
469.67 7,423.00
1 B-18 (1 B-18)
MWD
MWD - Standard
7,423.00 9,575.00
1 B-18AL2_wp02 (1 B-18AL2)
MWD
MWD - Standard
8/16/2016 1: 16 17P Page 5 COMPASS 5000.1 Build 74
V" Baker Hughes INTEQ rias
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup1
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 1 B Pad
Site Error:
0.00 usft
Reference Well:
1 B-18
Well Error:
0.00 usft
Reference Wellbore
1 B-18AL2
Reference Design:
1 B-18AL2_wp02
Local Co-ordinate Reference:
Well 1 B-18
TVD Reference:
1 B-18 @ 102.00usft
MD Reference:
1 B-18 @ 102.00usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
OAKE D M P2
Offset TVD Reference:
Offset Datum
Reference
1 B-18AL2_wp02
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
7,423.00 to 9,575.00usft Scan Method: Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,153.42 usft Error Surface: Elliptical Conic
Survey Tool Program Date 8/16/2016
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
469.67 7,423.00 1 B-18 (1 B-18) MWD MWD - Standard
7,423.00 9,575.00 1 B-18AL2_wp02 (1 B-18AL2) MWD MWD - Standard
Casing Points
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
(usft) Name
() ( )
4,256.00
4,147.97 7.625"
7-5/8 8-1/2
9,575.00
6,656.62 2 3/8"
2-3/8 3
Summary
Site Name
Offset Well - Wellbore - Design
Kuparuk 1 B Pad
1 B-04 - 1 B-04 - 1 B-04
1 B-05 - 1 B-05 - 1 B-05
1 B-06 - 1 B-06 - 1 B-06
1 B-07 - 1 B-07 - 1 B-07
1 B-13 - 1 B-13 - 1 B-13
1 B-13 - 1 B-131_1 - 1 B-131_1
1B-13- 1B-131_2- 1B-131-2
1 B-14 - 1 B-14 - 1 B-14
1B -15 -1B -15-1B-15
1 B-15 - 1 B-1 5A - 1 B-1 5A
1 B-15 - 1 B-1 5A - Plan: 1 B-1 5A (wp03)
1 B-15 - 1 B-15AL1 - 1 B-15AL1
1 B-15 - 1 B-15AL2 - 1 B-15AL2
1B-15- 1B-15AL2PB1 - 1B-15AL2PB1
1 B-15 - 1 B-15AL2PB2 - 1 B-15AL2PB2
1 B-15 - 1 B-15AL3 - 1 B-15AL3
1 B-15 - 1 B-15AL3PB1 - 1 B-15AL3PB1
1B -16 -1B -16-1B-16
1B -18 -1B -18-1B-18
1 B-18 - 1 B-1 8A - 1 B-18A_wp06
16-18- 1B-18AL1 - 1B-18AL1_wp03
1 B-19 - 1 B-19 - 1 B-19
1 B-19 - 1 B-1911 - 1 B-191_1
1 B-19 - 1 B-1911-01 - 1 B-191-1-01
1 B-19 - 1 B-191_1-02 - 1 B-1911-02
WSW -03 - WSW -03 - WSW -03
WSW -04 - WSW -04 - WSW -04
WSW -05 - WSW -05 - WSW -05
Reference Offset Centre to No -Go Allowable
Measured Measured Centre Distance Deviation Warning
Depth Depth Distance (usft) from Plan
(usft) (usft) (usft) (usft)
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
8/16/2016 10:22:17AM Page 2 COMPASS 5000.1 Build 74
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
8,955.12
7,375.00
528.92
147.84
391.80
Pass - Major Risk
Out of range
Out of range
Out of range
8,200.00
10,350.00
801.55
157.47
653.07
Pass - Major Risk
Out of range
8,929.54
10,033.00
981.98
180.89
808.56
Pass - Major Risk
8,962.97
10,300.00
289.05
164.94
182.46
Pass - Major Risk
Out of range
Out of range
7,474.99
7,475.00
0.30
4.22
-2.25
FAIL- Major Risk
7,474.99
7,475.00
0.30
1.07
-0.47
FAIL- Minor 1/10
7,474.99
7,475.00
0.30
1.07
-0.47
FAIL - Minor 1/10
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
8/16/2016 10:22:17AM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips
Project: Kuparuk River Unit
Site: Kuparuk 1B Pad
A imuthat,Tr North
Magnetic North: 18.01°
Magnetic Field
WELLBORE DETAILS: 1B-18AL2
REFERENCE INFORMATION
Parent Wellbore: 1B-18
Co-ordinate (N/E) Reference: Well 1B-18, True North
Well: IB -18
strength: s7s507-T
Tie On MD: 7423.00
Vertical (TVD) Reference: Mean Sea Level
Wellbore: 1B-18AL2
Dip Angk: 80.56^
IB -15 f6 -IS LI
Section (VS) Reference: Slot -(O.00N, 0.00E)
Plan: 16-18AL2 wp02 (16-18/16.18AL2)
Model BGGM 016 101112016
0.00
Measured Depth Reference' f B-18 @ 10200usft
5969647.06 550148.90
70' 19'40.248 N 149' 35'35.868 W
Sec
Calculation Method: Minimum Curvature
624
630
636
642'
O
648
li 654
v 660
666
N
672
678
684
Mean Sea
-900
-loco
-1200
-1350
-15
-1650
-1800
C:,-1950
,�-i
2100
_� -2250
0
2400
0-2550
-2700
-2850
-3000
-3150
r0.r
BAKER
HUGHES
WELL DETAILS:
113-18
West( -)Bast(+) (150 usft/in)
+N/ -S
+E/ -W
Northing
Easting
IB -15 f6 -IS LI
Latitude
Longitude
0.00
0.00
1 -15i1 '15AL PBI
r
5969647.06 550148.90
70' 19'40.248 N 149' 35'35.868 W
Sec
MD
Inc
Azi
TVDSS +N/ -S +E/ -W
Dleg
TFace VSect
Annotation
1
7423.00
39.50
191.92
6520.41 -2452.03 -258.71
0.00
0.00-1001.97
TIP
2
7460.00
39.07
191.92
6549.04 -2474.96 -263.55
1.16
180.00 -1009.24
KOP
3
7485.00
42.13
194.53
6568.03 -2490.79 -267.28
14.00
30.00 -1013.92
End 14 dls, Start 40 dls
4
7617.47
91.00
218.06
6619.73 -2593.35 -323.30
40.00
30.00 -1016.69
4
5
7695.00
92.40
249.06
6617.37 -2638.83 -384.88
40.00
87.00 -986.10
5
6
7845.00
96.40
309.13
6604.69 -2616.49 -525.80
40.00
84.00 -852.89
End 40 d1s, Start 7 dls
7
7995.00
95.38
298.63
6589.26 -2533.45 -649.50
7.00
265.00 -704.24
7
8
8095.00
95.34
305.66
6579.91 -2480.51 -733.75
7.00
90.00 -604.81
8
9
8170.00
100.27
307.48
6569.72 -2436.26 -793.41
7.00
20.00 -531.01
9
10
8245.00
96.23
310.87
6558.96 -2389.38 -850.93
7.00
140.00 -457.77
10
11
8320.00
95.75
316.13
6551.13 -2338.06 -905.01
7.00
95.00 -385.27
11
12
8475.00
89.48
307.26
6544.04 -2235.25 -1020.48
7.00
235.00 -233.86
12
13
8800.00
87.59
284.58
6552.46 -2094.15 -1310.77
7.00
265.00 88.08
13
14
8900.00
90.00
278.00
6554.57 -2074.59 -1408.75
7.00
290.00 182.72
14
15
9275.00
90.00
304.25
6554.60 -1940.61 -1755.49
7.00
90.00 550.00
15
16
9575.00
90.00
283.25
6554.62 -1820.45 -2028.55
7.00
270.00 846.55
Planned TD at 9575.00
624
630
636
642'
O
648
li 654
v 660
666
N
672
678
684
Mean Sea
-900
-loco
-1200
-1350
-15
-1650
-1800
C:,-1950
,�-i
2100
_� -2250
0
2400
0-2550
-2700
-2850
-3000
-3150
r0.r
BAKER
HUGHES
-2400 -2250 -2100 -1950 -1800 -1650 -1500 -1350 -1200 -1050 -900 -750 -600 -450 -300 -150 0 150 300
West( -)Bast(+) (150 usft/in)
1B -I5 1B -I5
IB -15 f6 -IS LI
I13-15/
13-15 L2
1B-IS{.i13 L.2PB
1 -15i1 '15AL PBI
r
iB-15.1B-15
ned Dat 575.00
IB -I /IE I AL3 F"I
1B -IS 1B-18 L2
IB I 5111 ISAL
IB-18AL2 F ult2
O F N
IS
IB -18 1B-1
IB -1 AL2_ au 1
B-18lIB'-1
1B-18AL2 T08
14 *13 11
I B 15/16 I5AL PB2 0-o
1
IP
+
KOP
IB-1../IB-1SA1.3P
1
i10. •'
nd 14 Is, Sta
i
9.•
1B-1 ALz_ 07
7 --.a
1B I 8AL2 TOZ d 40'd , Start d s IB- 8/IB- 8
1B-I.lI11-I51.21?2
1B-1 AL2 Nt4
Q -IS/ B -I5. L2
113 18AL2 T02 1B-18 L2 T 1
1
-2400 -2250 -2100 -1950 -1800 -1650 -1500 -1350 -1200 -1050 -900 -750 -600 -450 -300 -150 0 150 300
Vertical Section at 300.00° (60 usft/in)
West( -)Bast(+) (150 usft/in)
I13-15/
13-15 L2
1 -15i1 '15AL PBI
r
IB -I /IE I AL3 F"I
O F N
I B 15/16 I5AL PB2 0-o
i
i
113-LVIQ-I_AL21`
1
_ TI
i
1B
18/I13-
18ALI
_En 14 d1s Stam dls
1B -18/1B
-18A
9 10
1 1
13 14 15 Plann
d7 STD a 9575,00
71
IB
18/I11 18AL
4 5
End 40 dls, Start 7 tills
I
1B-1 A 2 ault2
1B-18 A, 2 Fttuttl
Vertical Section at 300.00° (60 usft/in)
KUP PROD IB -18
COnocoPhillips �'- '
Well Attributes
Max Angle & MD TD
,iia;";{CiB, If1C.
Welibere APUUVl1 Field Name Wellbore Stelus
500292247200 KUPARUK RIVER UNIT PROD
Incl (•) MD (itKe) Aet Btm jftKB)
43.20 6,897.51 7;824.0
•••
Comment H25 (ppm) Data
SSSV: WRDP 166 11/8f2014
Annotation Entl Date KB-Grd {tt) Rig Release Date
Last WO: 6/21/2612 40.81 4/30/1994
iS-18,12/8201545913PM
vertical schematic (acwal)
Annotation Depth (7tK0) Entl Date
Annotation Leet Mod By End Date
.. .. _._.... ,..
Last Tag: SLM 7,477.0 12/11/014
Rev Reason: REPLACE WRDP/SLIPSTOP pproven 12/6/2015
HANGER:25.3
astng mgs
ceeing Description OD (In)
ID (In)
Top (ftKB)
Set Depth (ftKB)
Set Depth (TVD)..-
WULen (1...
Grade
Top Thread
CONDUCTOR 16
15.063
43.0
121.0
121.0
62.50
H-40
WELDED
Casing Description OD (in)
10 (in)
Top (ftKB)
Set Depth (ftKB)
Set Depth (TVD).-.
WULen (1...
Grade
Top Thread
SURFACE 7518
6.875
41.3
4,255.6
4,147.7
29.70
L-80
LTC
Casing Description OD (In)
ID (in)
Top (ftKB)
Sol Depth (ftKB)
Set Depth (TVD)...
WULon p...
Grade
Top Thread
PRODUCTION TIE- 5112
4.892
26.3
1,771.5
1,771,4
17.00
L-80
TC -11
BACK
CONDUCTOR, 43.0-121.0
Casing DescrII OD (in)
PRODUCTION 5.5"x5" @ 5 112
ID (in)
4.766
Top (ftKB)
1,771.5
Set Depth (ftKB)
7,809.4
Set Depth (TVD)...
6,929.5
WULen (I...
17.00
Grade
L-80
Top Thread
LTC MOD
7044'
Tubing Strings
Tubing Description String Ma... ID (In) Top (HKB) Set Depth {k.. Set Depth (TVO) (... WI {IbHt) Grade Top Connection
PRODUCTION TIE -BACK'. 26.3-
TUBING WO 31/2 2.992 25.3 6.930.3 6,251.4 9.20 L-80 IBT-M
1,771.5
Completion Details
Nominal ID
Top(ftKB) Top (TVD) (ftKB) Top Incl I-) Item Des Com (in)
TSG STOP; 1.9491
WRDP; 1,950.7
25.3 25.3 0.01 HANGER FMC GEN 1V TUBING HANGER 3.500
NIPPLE: 1,950.7
1,950.7 1,950.7 0.79 NIPPLE CAMCO BP -61 LANDING NIPPLE 2.812
6,894.9 6,225.5 43.19 NIPPLE HESXNIPPLE 2.812
6,918.1 6,242.5 43.06 LOCATOR BAKER LOCATOR SUB 3.000
GAS LIFT 24829.7
6,919.0 6,243.2 43.05 SEALASSY BAKER GSH -22 SEAL ASSEMBLY 3.000
Tubing Deecrlption String M....1 10 (In) Top (HKB) get Depth (ft.. Set Depth (TVD) (... yyi (Ib/k) Grade Top Conneetlon
SEALASSY 3112 2.992 6,920.0 7,046.6 6,337.2 9.30 L-80 EUE8RD
Completion Details
Nominal ID
Top (ftKB) Top (TVD) (ftKB) Top Inel (°) Item Dee Co. (in)
6,920.0 6,243.9 43.04 PUN BAKER POLISHED BORE RECEPTACLE 3.000
GAS LIFT; 4,223.6
6,933.3 6,253.6 42.95 SEALASSY KBH-22 ANCHOR SEAL ASSEMBLY 3.000
6,933.7 6,253.9 42.95 PACKER BAKER FA-( 46A36 PACKER 3.020
7,034.0 6,327.8 42.24 LOCATOR BAKER LOCATOR 2.990
7,034.8 6,328.4 42.23 SEAL ASSY BAKER GBH -22 SEAL ASSEMBLY W/O SEALS 2.980
SURFACE; 41.34.255.6
Other In Hole (Wireline retrievable plugs, halves, pumps, fish, etc.)
TOP(TVDI Topincl
Top (HHB) (HKB) (•) Des Co. Run Date ID (In)
GAS LIFT: 5, 496.0
1.949.7 1,949.6 0.79 TBG STOP 3.5" TUBING STOP 121512015
1,950.7 1,950.6 0.79 WRDP 3.5" WRDP (SIN; C25-0318)ON 2.81" B-7 LOCK 12/5/2015 1.520
(OAL=65")
Perforations & Slots
GAS LIFT'. G, 335.6
Shot
Dans
Top (TVD)
Btm (TVD)
(shotff
TOP (ftKB)
Bum (ftKB)
(ftKB)
(ftKB)
Zone
Date
1)
Type
Com
7.131.0
7,161.0
RM.2
6,422.7 C.1.
C-3, 1B- 11/5/1994
6.0
RPERF
21/8"EnerjeL 90 deg
18
phase, 45 deg
GAS LIFT', 6,862 3
orientation
7,166.0
7,176.0
6,426.5
6,434.0 C-21
1B-18 11/5/1994
6.0
RPERF
21/8"Enerjet 90 deg
phase: 45 deg
orientation
NIPPLE; 6,8945
7,182,0
7,194.0
6,438.5
6,447.6 C-2,
IB -18 11/5/1994
6.0
RPERF
21/8"Enerjet 90 deg
phase, 45 deg
orientatlan
LOCATOR', 6.918.1
7,246.0
7,273.0
6,486.9
6,507.4 C-1,
1B-18 2/4/1995
6.0
RPERF
21/8" Enerjet, 90 deg
phase, 45 deg
SEAL ASSY'6,9190-,-'
orientation
PER; 6.920.0
7,256.0
7.539.0
6,494.5
6,712.8 A-4,
1B-18 6/9/1994
4.0
IPERF
33/8" HSD CSG guns,
SEAL ASSY; 8,933.3
Oriented
7,548.0
7,575.0
6,719.9
6,741.2 -4,13-18
6/9/1994
4.0
(PERF
33/8" HSD CSG guns,
PACKER; 6,933.6
IA
1
Oriented
Cement Squeezes
Tap I' -DI
Bim{TVDI
lop (7tKB) Btm
(ftKB)
(ftKB)
"'I '
Des
Stan Date
Com
j
26.3
1,T71.51
26.31
1,771.4
CSG CMT
8/8/2012
PRODUCTION nl:BACK CEMENT
LOCATOR, 7,034.0
Mandrel Inserts
SEAL ASSY; 7,034 8
Bt
at]
on Top (TVD)
N Top (ftKB) (ftKBI Make Model 0D(h)
Valve Latch Pod Size TRO Run
Sero Type Type in) (psi) Run Date Co.
1 2,629.7 2,629.6 CAMCO KBG-2- 1
GAS LIFT GLV INT 0.156 1,246.0 9/3/2012
9
2 4,223.6 4,120.9 CAMCO KBG-2- 1
GAS LIFT GLV INT 0.156 1,249.0 9/2/2012
_
RPERF: 7.131.0-7,161.0
9
3 5,498.0 5,120.9 CAMCO KBG-2- 1
GAS LIFT GLV INT 0.188 1,283.0 912/2012
9
RPERF; 7,166.0-7,176.0
4 6,335.6 5,805.5 CAMCO KBG-2- 1
GAS LIFT GLV INT 0.188 1,276.0 9/2/2012
9
RPERF; 7.182.0-7,194.0
5 6,862.3 6,201.6 1 CAMCO KBG-2- 1
9
GAS LIFT OV INT 0.250 0.0 9/212012
Notes: General & Safety
End Date
Annotation
RPERF, 7,246.0-7.273.0
8/9/2010
NOTE View Schematicw/ Alaska Schematic9.0
IPERF, 7,258.0-7.539.0
I P E R F'. 7.548.(t-7,575,0
PRODU CTION 5.5Y5" 4M 7044`.
1.7526-7.809 4
I B-18 Proposed CTD Schematic
16" 62# H-40
shoe @ 121'M
7-5/8" 29.7# L-80
shoe @ 4147' MD
5.5" 17# L-80 shoe
@ 6997' MD
C -sand perfs (sqz'd)
7131'- 7273' MD
KOP @ 7505' MD
3/2' x 5" TTWS set at 330° toolface
A -sand perfs (sqz'd)
7256'- 7575' MD
Tapered Prod Csq
5%, 17#, L-80, 0'-7044' MD
5",18#, L-80, 7044'-7809' MD
Camco BP -6 injection nipple @ 1951' MD
ID = 2.813"
3-1/2" 9.3# L-80 EUE 8rd Tubing to surface
3-1/2" Camco gas lift mandrels @ 2629', 4223', 5498', 6335'&
6862'
X -nipple @ 6895' MD
ID = 2.812"ID
Baker GBH -22 Loactor & Seal assembly at 6918
Baker 3-1/2" PBR @ 6920' MD (3" ID)
Baker KBH-22 anchor seal assembly at 6933' MD
Baker FA -1 packer @ 6934' MD
5" casing sealbore extension @ 7044' (4.0" ID)
3-1/2" tubing tail @ 7047' MD
1 B-18AL2 TD @ 9,575' MD
TOL @ —7040' MD
/______________ _____ ______________
1 B-1 8A TD @ 11 400'MD
wp07 w/ <7°DLS and tapered string
Billet at 8900' MD
1 B-18AL 1 TD @ 11,300' M D
TOL @ 7500' MD
TRANSMITTAL LETTER CHECKLIST
WELL NAME: Out- /3— M+1,2L
PTD: Aj b - Jlo
/Development Service Exploratory Stratigraphic Test _ Non -Conventional
FIELD: � t ,� POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
/
MULTI
The permit is for a new wellbore segment ofexisting well Permit
LATERAL
No. aI % — IO� API No. 50-( -_-QL- U G.
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -) from records, data and logs acquired for well
(name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
sample are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT
PTD#:2161100 C
Administration
Appr Date
PKB 9/6/2016
Engineering
Appr Date
VTL 9/13/2016
Geology
Appr Date
PKB 9/6/2016
17
1
2
'3
4
5
6
7
8
9
10
11
12
13
14
15
16
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
XLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100
ny CONOCOPHILLIPS ALASKA INC Initial Class/Type
Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)
NA
Permit fee attached
NA
Lease number appropriate
Yes
Unique well name and number
Yes
Well located in a defined pool
Yes
Well located proper distance from drilling unit boundary
Yes
Well located proper distance from other wells
Yes
Sufficient acreage available in drilling unit
Yes
If deviated, is wellbore plat included
Yes
Operator only affected party
Yes
Operator has appropriate bond in force
Yes
Permit can be issued without conservation order
Yes
Permit can be issued without administrative approval
Yes
Can permit be approved before 15 -day wait
Yes
Well located within area and strata authorized by Injection Order # (put 10# in comments) (For
NA
All wells within 1/4 mile area of review identified (For service well only)
NA
Pre -produced injector: duration of pre -production less than 3 months (For service well only)
NA
Conductor string provided
NA
Surface casing protects all known USDWs
NA
CMT vol adequate to circulate on conductor & surf csg
NA
CMT vol adequate to tie-in long string to surf csg
NA
CMT will coverall known productive horizons
No
Casing designs adequate for C, T, B & permafrost
Yes
Adequate tankage or reserve pit
Yes
If a re -drill, has a 10-403 for abandonment been approved
NA
Adequate wellbore separation proposed
Yes
If diverter required, does it meet regulations
NA
Drilling fluid program schematic & equip list adequate
Yes
BOPEs, do they meet regulation
Yes
BOPE press rating appropriate; test to (put psig in comments)
Yes
Choke manifold complies w/API RP -53 (May 84)
Yes
Work will occur without operation shutdown
Yes
Is presence of H2S gas probable
Yes
Mechanical condition of wells within AOR verified (For service well only)
NA
Permit can be issued w/o hydrogen sulfide measures
No
Data presented on potential overpressure zones
Yes
Seismic analysis of shallow gas zones
NA
Seabed condition survey (if off -shore)
NA
Contact name/phone for weekly progress reports [exploratory only]
NA
Geologic Engineering Public
Commissioner: Date: o issioner: Date Commissioner Date
Well Name: KUPARUK RIV UNIT 113-18AL2 _ Program DEV
DEV/PEND GeoArea 890 Unit 11160 _ On/Off Shore On
ADL0025648, entire wellbore.
KRU 1 B-18AL2
KUPARUK RIVER, KUPARUK RIV OIL - 490100, governed by Conservation Order No. 432D..
CO 432D contains no spacing restrictions with respect to drilling unit boundaries.
CO 432D has no interwell spacing restrictions.
Well bore seg ❑d
Annular Disposal ❑
Wellbore will be more than 500' from an external property line where ownership or landownership changes.
Conductor set in KRU 1B-18
Surface casing set in KRU 1B-18
Surface casing set and fully cemented
Productive interval will be completed with uncemented slotted liner
Rig has steel tanks; all waste to approved disposal wells
Anti -collision analysis complete; no major risk failures
Max formation pressure is 3005 psig(9.0 ppg EMW); will drill w/ 8.6 ppg EMW and maintail overbal w/ MPD
MPSP is 2347 psig; will test BOPs to 3500 psig
H2S measures required
Wells on 16 -Pad are H2S-bearing. H2S measures required.
Max. potential reservoir pressure is 9.0 ppg EMW; will be drilled using 8.6 ppg mud and MPD technique.
Onshore development lateral to be drilled.