Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
216-122
• • Wallace, Chris D (DOA) From: NSK Well Integrity Supv CPF3 and WNS <n2549@conocophillips.com> Sent: Wednesday, October 25, 2017 6:05 PM To: Wallace, Chris D (DOA); Loepp,Victoria T (DOA) Cc: Senden, R.Tyler Subject: CRU CD5-02A, CD5-04, and CD5-99A Water Flow in Conductors Chris/Victoria, CRU wells CD5-02A(PTD 216-068), CD5-04(PTD 215-072), and CD5-99A(.1TD 216-122) have recently been noted as having water flowing to surface through the surface casing by conductor annulus. CPAI suspects this water to be from the same shallow source water that was encountered on CD5-313 (PTD 215-084),as well as other CD5 wells. We will take initial samples for analysis and collect water at the wellhead to monitor the flow volume. Please let us know if you have any questions or disagree with this plan. Regards, Rachel Kautz/Travis Smith Well Integrity Supervisor,ConocoPhillips Alaska Inc. Office:907-659-7126 Cell:907-943-0450 SCANNED ti DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161220 Well Name/No. COLVILLE RIV UNIT CD5-99A Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-01-00 MD 27128 TVD 7716 Completion Date 11/30/2016 REQUIRED INFORMATION Mud Log No Completion Status 1-0IL Samples No Current Status 1-0I1- UIC No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 27798 Digital Data 42 2347 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99A—Scope Gamma Ray_ RM_ LAS _LWD001.1as ED C 27798 Digital Data 2296 15582 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_Scope Resistivity_RM_LAS_LWD007.las ED C 27798 Digital Data 15542 24118 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_Scope Resistivity_RM_LAS _LWD008.las ED C 27798 Digital Data 24077 27129 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_Scope Resistivity_RM_LAS _LWD009.1as ED C 27798 Digital Data 42 27129 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99A Scope Resistivity_RM_LAS.las ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A Scope_ Gamma_Ray_RM_LWD001.dlis ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Gamma_Ray_RM_LWD001.html , ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A Scope_Resistivity_RM_LWD007.dlis . ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM_LWD007.html ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM_LW D008.dlis . ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM_LWD008.html ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM_LWD009.dlis ' ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM_LW D009.html AOGCC Page I of 5 Tuesday, April 25, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161220 Well Name/No. COLVILLE RIV UNIT CD5-99A Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-01-00 MD 27128 TVD 7716 Completion Date 11/30/2016 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM.dlis ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A_Scope_Resistivity_RM.html ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- P 99A_Scope_Resistivity_2MD_RM.pdf ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 119 99A_Scope_Resistivity_2TVD_RM.pdf ED C 27798 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99A Scope_ Resistivity_5MD_RM.pdf ° ED C 27798 Digital Data /8/2016 Electronic File: CPAI_CD5- 99A Scope_Resistivity_5TVD_RM.pdf ' ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad27 EOW CompassSurveys.pdf ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad27 [canvas].txt- ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad27 [macro].txt . ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad27 [petrel].txt ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad27 [surveys].txt , ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad83 EOW . CompassSurveys.pdf ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad83 [canvas].txt• ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad83 [macro].txt . ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad83 [petrel].txt' ED C 27798 Digital Data 12/8/2016 Electronic File: CD5-99A Nad83 [surveys].txf Log C 27798 Log Header Scans 0 0 2161220 COLVILLE RIV UNIT CD5-99A LOG HEADERS ED C 27804 Digital Data 14462 14651 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_Cutter_21Nov16_ONE_Log_5_Up_Correlat . ion.las ED C 27804 Digital Data 14366 14651 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_Cutter_21 Nov16_ONE_Log_7_Up_Cutting. las ED C 27804 Digital Data 12/7/2016 Electronic File: CPAI_CD5- 99A_Cutter _21 Nov16_ConCu_R01_L005Up_Corr elation.dlis AOGC'C Page 2 of 5 Tuesday, April 25, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161220 Well Name/No. COLVILLE RIV UNIT CD5-99A Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-01-00 MD 27128 TVD 7716 Completion Date 11/30/2016 Completion Status 1 -OIL ED C 27804 Digital Data P 12/7/2016 Electronic File: CPAI_CD5- ED C 27804 Digital Data 2161220 COLVILLE RIV UNIT CD5-99A LOG Log C 27804 Log Header Scans 0 0 Log C 27805 Log Header Scans 0 0 ED C 27805 Digital Data 2444 8 ED C 27805 Digital Data 6035 2236 ED C 27805 Digital Data 2444 8 ED C 27805 Digital Data Electronic Data Set, Filename: CPAI_CD5- ED C 27806 Digital Data 1334 1593 ED C 27806 Digital Data 2184 2646 ED C 27806 Digital Data 6011 6278 ED C 27806 Digital Data 168 14041 ED C 27806 Digital Data 13655 14040 ED C 27806 Digital Data 2600 L12Cu.dlis ED C 27806 Digital Data Current Status 1 -OIL UIC No 12/7/2016 Electronic File: CPAI_CD5- 99A_Cutter_21 Nov16_ConCu_R01 _L007Up_Cutt. ing.dlis P 12/7/2016 Electronic File: CPAI_CD5- 99A Cutter 21Nov16 FieldPrint.Pdf ' 2161220 COLVILLE RIV UNIT CD5-99A LOG HEADERS 2161220 COLVILLE RIV UNIT CD5-99A LOG HEADERS 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A Caliper_23Nov16_MainPass_2400-O.las 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_Caliper_23Nov16_Mai n Pass_6000-2250.las 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A Caliper_23Nov16_RepeatPass.las 12/7/2016 Electronic File: CPAI_CD5- 99A_Caliper_23Nov16_FieldPrint.pdf 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_USIT_24Nov16_HiRes_1375- 1500 L13Pr.las 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_USIT_24Nov16_HiRes_2225- 2600 L12Pr.las 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A—LIST _ 24Nov16_HiRes_6045- 6100 L11Pr.las 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_USIT_24Nov16_Main_Composite_Pr.las 12/7/2016 Electronic Data Set, Filename: CPAI_CD5- 99A_USIT_24Nov16_Repeat_L05Pr.las 12/7/2016 Electronic File: CPAI_CD5- 99A_ USIT_24Nov16_HiRes_1375- . 1500 L13Cu.dlis 12/7/2016 Electronic File: CPAI_CD5- 99A USIT 24Nov16 HiRes 2225- 2600 L12Cu.dlis AOGCC' Page 3 of 5 Tuesday, April 25, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161220 Well Name/No. COLVILLE RIV UNIT CD5-99A Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-01-00 MD 27128 TVD 7716 Completion Date 11/30/2016 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 27806 Digital Data 12/7/2016 Electronic File: CPAI_CD5- 99A_USIT_24Nov16 HiRes 6045- ' 6100 L11CuAlis ED C 27806 Digital Data 12/7/2016 Electronic File: CPAI_CD5- 99A_USIT_24Nov16_Main_Composite_Cu.dlis , ED C 27806 Digital Data 12/7/2016 Electronic File: CPAI_CD5- 99A USIT_24Nov16_Repeat_L05Cu.dlis , ED C 27806 Digital Data p 12/7/2016 Electronic File: CPAI_CD5-99A_USIT- , C Corrosion 24Nov16 Field Print. Pdf Log C 27806 Log Header Scans 0 0 2161220 COLVILLE RIV UNIT CD5-99A LOG HEADERS ED C 28108 Digital Data 2/28/2017 Electronic File: CONOCOPHILLIPS NORTH SLOPE - EBUS CD5-99 GWPC-PostJob.xls Log C 28108 Log Header Scans 0 0 404 CD - PTD Hydraulic Fracture Data Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Production Test Informatio/QV NA Geologic Markers/Tops COMPLIANCE HISTORY Completion Date: 11/30/2016 Release Date: 9/20/2016 Description Directional / Inclination Data 12) Mechanical Integrity Test Information Y /40 Daily Operations Summary ID Date Comments Mud Logs, Image Files, Digital Data Y / paH) Core Chips Y/ A Composite Logs, Image, Data Files Core Photographs Y / A Cuttings Samples Y �N Laboratory Analyses Y / AOGCC Page 4 of 5 Tuesday, April 25, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161220 Well Name/No. COLVILLE RIV UNIT CD5-99A Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-01-00 MD 27128 TVD 7716 Completion Date 11/30/2016 Completion Status 1-011- Comments: -OILComments: Compliance Reviewed By: Current Status 1-0I1- Date: UIC No AOGCC Page 5 of' 5 Tuesday, April 25, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 2-SW'6 1. Operations Abandon F Plug Perforations Fracture Stimulate Pull Tubing Operations Shutdown (� Performed: - Suspend ( Perforate Other Stimulate ', Alter Casing Change Approved Program Plug for Redrill ( Perforate New Pool Repair Well Re-enter Susp Well 2. Operator Name: 4. Well Class Before Work: 5. Permit to Drill Number: ConocoPhillips Alaska, Inc. Development Exploratory r— Service 216-122-0 3. Address: 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 Stratigraphic v 50-103-20748-01 7. Property Designation (Lease Number): 8. Well Name and Number: ASRC NPR4, ASRC NPR2, 387208, 387209 CRU CD5-99A 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Colville River Field / Alpine Oil Pool 11. Present Well Condition Summary: Total Depth measured 27128 feet Plugs (measured) None true vertical 7716 feet Junk (measured) None Effective Depth measured 27071 feet Packer (measured) 14512, 14586, 15197, 1526 true vertical 7715 feet (true vertical) 7357, 7382, 7511, 7516 Casing Length Size MD ND Burst Collapse CONDUCTOR 78 20 115 115 SURFACE 2301 103/4 2337 2183 INTERMEDIATE 15537 75/8 15571 7564 PRODUCTION 11845 41/2 27071 7715 nrl E C E I V E PDL Perforation depth: Measured depth: 27071-16124 True Vertical Depth: 7714-7591 FEB 2 S 2017 Tubing (size, grade, MD, and TVD) 3.5, L-80, 15251 MD, 7520 TVD Packers & SSSV (type, MD, and TVD) PACKER - PACKER, BAKER PREMIER PRODUCTION PACKER @ 14512 MD and 7357 TVD PACKER -HALIBURTON TNT PACKER @ 14586 MD and 7382 TVD PACKER - HALIBURTON TNT PACKER @ 15197 MD and 7511 TVD PACKER - HRDE ZXP LINER TOP PACKER @ 15226 MD and 7516 TVD SSSV: NONE 12. Stimulation or cement squeeze summary: Intervals treated (measured): 25152-16124 Treatment descriptions including volumes used and final pressure: Total Well - 8 stages 700K lbs placed...... See attached schematic for full FRAC details 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation 2353 3494 4 1390 223 Subsequent to operation 2547 1450 117 1155 222 14. Attachments (required per 20 AAC 25.070, 25.071, &25.283) 15. Well Class after work: Daily Report of Well Operations \l� Exploratory Development Service ( Stratigraphic Y Copies of Logs and Surveys Run cp i� 16. Well Status after work: Oil Gas I WDSPL Printed and Electronic Fracture Stimulation Data FV_ GSTOR F WINJ F WAG f— GINJ F SUSP F SPLUG F_ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 316-645 Contact Hanna.Sylte (a) 265-6342 Email Hanna.Sylte(cDconocophillips.com Printed Name Hana Sylte Title Completions Engineer _ Signature� ( Phone: 265-6342 Date 2 Z ' ZVA Form 10-404 Revised 5/2015 Sa 2 Su It O 'ginal Only C')�" Vz�1�l7 RDDPgs I i - 2 70 i7 1 ,7 CD5-99A DTTMST, JOBTYP SUMMARYOPS 1/25/17 DRILLING GAUGE & BRUSH TBG TO 2.79" TO 14600' SLM. CREW CHANGE. IN SUPPORT - PROGRESS. CAPITAL 1/25/17 DRILLING PUMP 36BBL DSL DWN TBG, PUMP 5BBL DSL DWN FL, (JOB SUPPORT - COMPLETE) rAPITAI 1/25/17 DRILLING ATTEMPT TO SET XX PLUG @ 14538'RKB. B&F XX NIP @ SAME SUPPORT - WHILE PUMPING 120BBL CRUDE. ATTEMPT TO SET PLUG. PIN CAPITAL WORKED. CHANGE OUT w/ NIGHT CREW. IN PROGRESS... 1/25/17 DRILLING SET 2.81" PLUG ASSY (LOCK,EQ SUB,FILL EXT & END CAP (OAL = SUPPORT - 51.5") @ 14538' RKB. PULLED GLV's @ 10247'& 4909' RKB's. REPLACE CAPITAL WITH DV's. IN PROGRESS. 1/26/17 DRILLING PULL OV @ 14379'RKB. READY FOR CIRC OUT. IN PROGRESS... SUPPORT - CAPITAL 1/26/17 PUMPING T PUMPED 520 BBLS 10.8 LB BRINE DWN TBG TAKING RETURNS UP IA TO PRODUCTION LINE OF CD5-03, PUMPED 92 BBLS DSL DOWN TBG AND U -TUBED FOR FREEZE PROTECT (JOB COMPLETE) 1/26/17 DRILLING S ATTEMPT TO SET DGLV @ 14379'RKB. CHANGE OUT TODAY CREW. IN PROGRESS 1/27/17 DRILLING S SET DGLV @ 14379'RKB. PERFORM PASSING MIT -IA. ATTEMPT MIT- T. PLUG NOT HOLDING PRESSURE. ATTEMPT TO PULL PLUG, PUSH TO XN @ 15219'RKB. RETRIEVE HALF LOCK BODY & FN. *APPROX 45" REMAINING IN HOLE PACKING MANDREL, XN EQ SUB, FILL EXT, END CAP* CHANGE OUT w/ NIGHT CREW. IN PROGRESS... 1/27/17 DRILLING S PERFORMED MIT -T TO 4600 PSI, **PASS**. RECOVERED 1 X KEY f/ BROKEN PLUG @ 15216'RKB w/ 2.5" MAGNET. CHANGE OUT TO DAY CREW. IN PROGRESS 1/28/17 DRILLING S ATTEMPT TO SPEAR FISH @ 15216'RKB. ATTEMPT TO RECOVER KEYS w/ MAGNET @ SAME. READY FOR COIL. IN PROGRESS... 1/29/17 DRILLING S MADE TWO RUNS WITH VENTURI BASKET, RECOVERED 1 DOG/KEY FROM TOP OF PLUG. (JOB IN PROGRESS) 1/30/17 DRILLING S RIH WITH 1.70" NOZZLE, EQUALIZE PLUG @ 15,218', PLUG EQUALIZED, ( JOB READY FOR SLICK LINE) 1/31/17 DRILLING S SPEAR FISH w/ SHEARABLE SPEAR(36") @ 15216'RKB. JAR ON FISH. UNABLE TO MOVE UPHOLE. CHANGE OUT w/ NIGHT CREW. IN PROGRESS... 1/31/17 DRILLING S ATTEMPT TO FISH PLUG @ 15216'RKB. CHANGE OUT TODAY CREW. IN PROGRESS 2/1/17 DRILLING S RETRIEVE REMAINDER OF PLUG BODY @ 15216'RKB w/ SPEAR. RIH w/ MAGNET. CHANGE OUT w/ NIGHT CREW. IN PROGRESS... 2/1/17 DRILLING S RECOVERED X KEY @ 15216' RKB w/ 2.5" MAGNET. DRIFT TBG TO 20' SLM w/ 3.895" G -RING. READY FOR FRAC. COMPLETE 2/3/17 FRACTURIN Opened 3 frac sleeves at toe and pumped stages 1-3 2/4/17 FRACTURIN Pumped stages 4-8, 452K lbs proppant placed. Job total 700K lbs proppant. 2/5/17 DRILLING S BRUSH AND FLUSHED TBG DWN TO XN NIP @ 15216' RKB w/ FULL BORE BRUSH, 2.79" G -RING. DRIFT TBG TO XN NIP w/ 2.78" SWAGE. SET 2.81" XX PLUG @ 14601' RKB. CHANGE OUT TO DAY CREW. IN PROGRESS 2/6/17 DRILLING S PULL DGLV @ 14378'RKB. READY FOR CIRC OUT. IN PROGRESS... I.Hydraulic Fracturing Fluid Product nponent Information Disclosure Fracture Date 2017-02-03 State: Alaska County: Harrison Bay API Number: 0510320744 CONOCOPHILLIPS NORTH SLOPE - Operator Name: EBUS Well Name and Number: CD5-99 Longitude: -150.22 Latitude: 70.31 Long/Lat Projection: Indian/Federal: none Production Type: True Vertical Depth (TVD): 0 Total Water Volume (gal)*: 475,128 Hydraulic Fracturing Fluid Composition: Chemical Maximum Abstract Maximum Ingredient Ingredient Trade Name Supplier Purpose Ingredients Service Concentration in Additive Concentration in Number (CAS (% by mass)** HF Fluid (% by #) mass)** Sea Water Operator Base Fluid Water 7732-18-5 96.00% 80.73130% BE -6 MICROBIOCIDE Halliburton Biocide Listed Below Listed Below CL -22 UC Halliburton Crosslinker Listed Below Listed Below CL -31 CROSSLINKER Halliburton Crosslinker Listed Below Listed Below LOSURF-300D Halliburton Non-ionic Surfactant Listed Below Listed Below MO -67 Halliburton pH Control Additive Listed Below Listed Below OPTIFLO-III DELAYED RELEASE Halliburton Breaker Listed Below Listed Below BREAKER SP BREAKER Halliburton Breaker Listed Below Listed Below WG -36 GELLING AGENT Halliburton Gelling Agent Listed Below Listed Below LVT-200 Penreco Additive Listed Below Listed Below Xinmi Wanli Wanli 20/40 Industry Additive Listed Below Listed Below Developmen t Co., Ltd IngredientsListed Listede Above 1,2,4 Tri methyl benzene 95-63-6 1.00% 0.00070% Above 2-Bromo-2-nitro-1,3-propanediol 52-51-7 100.00% 0.00174% Acrylate polymer Proprietary 1.00% 0.00098% Ammonium persulfate 7727-54-0 100.00% 0.01969% Borate salts Proprietary 60.00% 0.05903% Corundum 1302-74-5 65.00% 9.43007% Crystalline silica, quartz 14808-60-7 30.00% 0.00601% Cured acrylic resin Proprietary 30.00% 0.00591% Ethanol 64-17-5 60.00% 0.04171% Guar gum 9000-30-0 100.00% 0.23465% Heavy aromatic petroleum naphtha 64742-94-5 30.00% 0.02085% Hydrotreated Distillate, Light C9-16 64742-47-8 100.00% 0.80261% Muillite 1302-93-8 45.00% 6.52851% Naphthalene 91-20-3 5.00% 0.00348% Oxylated phenolic resin Proprietary 30.00% 0.02780% Poly(oxy-1,2-ethanediyl), alpha-(4- nonylphenyl)-omega-hydroxy-, 127087-87-0 5.00% 0.00348% branched Potassium formate 590-29-4 60.00% 0.05903% Potassium hydroxide 1310-58-3 5.00% 0.00243% Potassium metaborate 13709-94-9 Sodium carboxymethyl cellulose 9004-32-4 60.000 1.000 0.029170 0.000980 Sodium chloride 7647-14-5 4.000 3.366000 Sodium glycollate 2836-32-0 1.00% 0.00098% Sodium hydroxide 1310-73-2 30.00% 0.03632% Sodium persulfate 7775-27-1 100.00% 0.00083% Sodium sulfate 7757-82-6 0.10% 0.00000% Water 7732-18-5 100.00% 0.17974% * Total Water Volume sources may include fresh water, produced water, and/or recycled water '* Information is based on the maximum potential for concentration and thus the total may be over 100% Note: For Field Development Products (products that begin with FDP), MSDS level only information has been provided. All component information listed was obtained from the supplier's Material Safety Data Sheets (MSDS). As such, the Operator is not responsible for inaccurate supplier who provided it. The Occupational Safety and Health Administration's (OSHA) regulations govern the criteria for the disclosure of this information. Plea criteria for how this information is reported on an MSDS is subject to 29 CFR 1910.1200(i) and Appendix D. Ingredient Mass lbs Comments Company First Name Last Name Email Phone 3895277 Density = 8.540 0 NA 0 NA 0 NA 0 NA 0 NA 0 NA 0 NA 0 NA 0 NA 0 NA 34 84 48 Denise Tuck, Halliburton, 3000 N. Sam Houston Pkwy E., Houston, TX 77032,281- 871-6226 Halliburton Denise Tuck Denise.Tuck @Halliburton.c om 281-871-6226 950 2849 Halliburton Denise Tuck Denise.Tuck @Halliburton.c om 281-871-6226 455001 290 285 Halliburton Denise Tuck Denise.Tuck @Halliburton.c om 281-871-6226 2013 11322 1007 38726 315001 168 1343 Halliburton Denise Tuck Denise.Tuck @Halliburton.c om 281-871-6226 168 2849 118 1408 48 162411 48 1753 40 1 8674 v3.3 and/or incomplete information. Any questions regarding the content of the MSDS should be directed to the ise note that Federal Law protects "proprietary", "trade secret', and "confidential business information" and the ConocoPhiAips Al�iskd, Inc, 7 ALPINE CD5-99A Max Angle & MD JTD SSSV: NONE I I I Last W0: 1 1 36.551 11/30/2016 erou msec eau .............................. ......................... Annotation Depth (RKB) Entl Date Annotation LastMod BY End Data HANGER; 31.1 Last Tag: Rev Reason: SIDETRACK, PULLED XX PLUG, pproven 1/3/2017 .............................................................. - . .............. BALL 8 ROD, RHC PLUG BODY 8 GLV C/0 i7asmg rings ...................... .................... .......... . . : ....,..... Casing Description OD (in) ID (in) Top (ftKB) Set Depth (RKB) Set Depth (ND)... Wt/Len (I... Grade Top Thread CONDUCTOR 20 19.124 36.6 115.0 115.0 78.60 B Casing Description OD fin) ID (In) Top (ftKB) Set Depth (RKB) Set Depth (TVD)... WtlLen (1... Grade Top Thread SURFACE 103/4 9.950 36.0 2,337.1 2,182.7 45.50 L-80 Hyd563 Casing Description OD (In) ID (in) Top (RKB) Set Depth (RKB) Set Depth (TVD)... Wt/Len (I Grade Top Thread CONDUCTOR; 36.6-115.0 INTERMEDIATE 75/8 6.875 34.1 15,570.6 7,564.3 29.70 L-80 BTCM NIPPLE; 2,134.7 Casing Description OD (in) ID (in) Top (ftKB) Set Depth (WB)Set Depth (ND)... Wt/Len (I... Grade Top Thread Metal Skin Patch 7-5/8" 6.82 6.093 2,270.9 2,458.0 2,276.5 20.00 60ksi Casing Description OD (in) ID (in) Top (RKB) Set Depth (ftKB) Set Depth (ND)... WtlLen p... Grade Top Thread PRODUCTION LINER 41/2 3.958 15,226.1 27,071.0 7,714.8 12.60 L-80 TXP Liner Details Nominal ID Top(ftKB) Top (ND) (ftKB) Top Incl (°) Item Des Com (in) SURFACE; 38.0-2,337.1-� 1 15,226.1 7,516.1 80.46 PACKER Liner Top Packer,HRDE ZXP, w/11.45' SBE 4.820 15,244.2 7,519.1 80.62 NIPPLE RS Nipple, 5-1/2", Hyd563 4.250 15,246.6 7,519.5 80.64 HANGER Liner Hanger,DG FL pinned 2500 psi 4.810 Metal Skin Patch 7Sr8"; 2.270.9- 2.458.0 16,124.4 7,591.5 88.18 FRAC PORT Baker Express Frac Sleeve #11 (2.125" ball, 2.073" 2.073 seat) GAS UFT; 4,903.2 16,920.4 7,598.1 90.26 FRAC PORT Baker Express Frac Sleeve #10 (2.063" ball, 2.035" 2.035 seat) 17,737.8 7,603.9 89.88 FRAC PORT Baker Express Frac Sleeve #9 (2.00" ball, 1.948" 1.948 seat) 18,571.2 7,615.4 89.73 FRAC PORT Baker Express Frac Sleeve #8 (1.938" ball, 1.883" 1.883 seat) GAS LIFT; 10,247.8 19,366.5 7,621.6 89.09 FRAC PORT Baker Express Frac Sleeve #7 (1.875" ball, 1.823" 1.823 XO Threads; 10,265.2 seat) 20,163.7 7,630.5 90.07 FRAC PORT Baker Express Frac Sleeve #6 (1.813" ball, 1.780" 1.780 seat) GAS LIFT; 14,378.8 20,996.8 7,637.7 89.51 FRAC PORT Baker Express Frac Sleeve #5 (1.75" ball, 1.705" 1.705 seat) GAUGE; 14,437.1 21,794.9 7,646.4 89.90 FRAC PORT Baker Express Frac Sleeve #4 (1.688" ball, 1.636" 1.636 LOCATOR; 14,458.9 seat) SEAL ASSY; 14,465.9 459.9 PBR; 14, 22,860.6 7,681.7 87.16 FRAC PORT Baker Express Frac Sleeve #3 (1.625" ball, 1.573" 1.573 seat) PACKER; 14,511.6 24,000.6 7,684.9 88.61 FRAC PORT Baker Express Frac Sleeve #2 (1.563" ball, 1.511" 1.511 seat) NIPPLE; 14,538.3 25,152.8 7,694.2 89.67 FRAC PORT Baker Express Frac Sleeve #1 (1.495" ball, 1.465" 1.465 SEAL ASSY; 14,558.2 seat) I Tubing -Pup; 14,558.0 MULE SHOE; 14,562.8 Tubing Strings 9 9s Tubing Description String Ma... ID (in) Top (ftKB) Set Depth (ft.. Set Depth (ND) (... Wt (Ib/R) Grade Top Connection PACKER; 14,585.7 TUBING -UPPER 3 1/2 2.992 31.1 14,490.1 7,348.8 9.30 L-80 HYD563 NIPPLE; 14,601.7 Completion Details Nominal ID Top (ftKB) Top (ND) (ftKB) Top Incl (') Item Des Com (in) 31.1 31.1 0.11 HANGER FMC 4-1/2" Tubing Hanger TXP 3.958 2,134.7 2,026.1 37.15 NIPPLE Landing Nipple, 3-1/2",X, 2.813", EUE-8rd 2.813 PACKER; 15,196.7 14,437.1 7,329.2 67.70 GAUGE SLB Gauge Carrier, 9.3# L-80 EUE-8rd PinxPin w/top 2.897 NIPPLE; 15,216.1 coupling 14,458.9 7,337.4 68.13 LOCATOR BAKER MECH - No -Go 2.970 LOCATOR; 15,222.1 14,459.9 7,337.7 68.15 1 SEAL ASSY Seal assebly 80410 (6.09' space out from fully located) 5.480 Tubing Description String Ma... ID (in) Top (MB) Set Depth (R.. Set Depth (TVD) (... Wt (IWtt) Grade Top no lion MULE SHOE; 15,251.0 2nd Packer Assy 5 4.000 14,465.9 14,564.0 7,374.7 12.60 L-80 Completion Details Nominal ID Top (ftKB) Top (ND) (ftKB) Top Incl (°) Item Des Com (in) 14,465.9 7,340.0 68.27 PBR Baker PBR 80-40 4.000 14,511.6 7,356.6 69.21 PACKER Packer, Baker Premier Production Packer 2.870 INTERMEDIATE; 34.1-15,570.6----4i 14,538.3 7,365.9 69.77 NIPPLE Landing Nipple, 3-12",X, 2.813", EUE-8rd (XX Lock plug 2.813 installed -Pulled 12/1/2016) 14,556.2 7,372.0 70.15 SEAL ASSY Overshot packing (7.57' of swallow from guide) 3.600 14,562.8 7,374.3 70.30 MULE SHOE Over shot guide (2.85' from guide to pins) 5.480 Tubing Description String Ma... ID (in) Top (RKB) Set Depth (R.. Set Depth (ND) (... Wt (7111) Grade Top Connection TUBING - LOWER 31/2 2.992 14,554.1 15,252.0 7,520.4 9.30 TN 110 Hyd563 Completion Details Nominal ID Top (ftKB) Top (ND) (ftKB) Top Incl V) Item Des Com (in) 14,585.7 7,381.9 70.94 PACKER Haliburton TNT Packer, HYD563' 2.900 14,601.8 7,387.0 71.58 NIPPLE NIPPLE,LANDING,31/2",X,2.813", Hydril 563 -High 2.813 Burst 71.9° 15,196.7 7,511.2 80.19 PACKER Haliburton TNT Packer, HYD563' 2.900 15,216.1 7,514.4 80.37 NIPPLE NIPPLE,LANDING,3 1/2",XN,2.75" No Go,EUE8RDM 2.750 w1.875" ID (RHC plug installed -Pulled 12/32016 8 BALL & ROD) 15,222.1 1 7,515.4 80.42 LOCATOR Mechanical locator, EUE (6.41" OD locator) 3.000 15,251.0 7,520.2 80.68 MULE SHOE Baker WLEG 3.010 Stimulations & Treatments Proppant Designed (lb) Proppant In Formation (lb) Date 245,132.0 247,600.0 2/3/2017 Proppant Designed (Ib)Proppant In Formation (Ib) Date 450,660.0 452,400.0 2142017 Mandrel Inserts Ern Top (ND) Make Model OD(in) Valve S., Type Latch Type Port SizeTRO (In) RB)(ftKB) (psi)L Com9.2 3,405.7 Camco KBMG 1 GAS LIFT GLV BK -5 0.188 1,806.0 PRODUCTION LINER; 15,226.1 -27,071.0 RT(J Z l & -1 2- Z., Loepp, Victoria T (DOA) From: Wallace, Chris D (DOA) Sent: Wednesday, January 25, 2017 8:54 AM To: Loepp, Victoria T (DOA) Subject: RE: CD5-99A (PTD 2161220) Updated Pressure Test Values Follow Up Flag: Follow up Flag Status: Flagged Victoria, Yes, with OA of 500 psi being held this is all OK. The IA test of 3500 psi satisfies the 110% differential. With a PRV setpoint of 3500 psi minus the 500 psi OA requires a 3300 psi test. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7th Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska qov. From: Loepp, Victoria T (DOA) Sent: Tuesday, January 24, 2017 3:39 PM To: Wallace, Chris D (DOA) <chris.waIlace @alaska.gov> Subject: FW: CD5-99A (PTD 2161220) Updated Pressure Test Values Please review updated pre -frac pressures; should we approve? From: Sylte, Hanna [mailto:Hanna.Sylte conocophillips com] Sent: Tuesday, January 24, 2017 3:24 PM To: Loepp, Victoria T (DOA) <victoria.loepp alaska.Rov> Subject: CD5-99A (PTD 2161220) Updated Pressure Test Values Victoria, Due to a better understanding of the casing wear seen on the 7-5/8" casing for CD5-99 (PTD 2161220), we are planning to limit the IA pre -frac pressure test to 3500 psi instead of 3850 psi as stated in the sundry application. We are planning to hold 3400 psi on the annulus during the frac, with 500 psi held on the backside. This should still satisfy the requirement to test to 110% of the maximum anticipated pressure differential. Please let me know if you approve this change or have any questions or concerns. AOGCC Required Pressures [all in psi] Previously Submitted Updated Pressures Maximum Predicted Treating Pressure (MPTP) 6,000 6,000 Annulus pressure during frac 3,500 3,400* Annulus PRV setpoint during frac 3,600 3,500 7 5/8" Annulus pressure test 3,850 3,500 OA Pressure during frac 500 3 1/2" Tubing pressure Test 4,600 4,600 Nitrogen PRV 7,125 7,125 Highest pump trip 6,925 6,925 *Allowance of 3680 psi IA pressure during frac based on 3500 psi IA test - 10% + 500 psi in OA. Thank you, Hanna Sylte Associate Completions Engineer ATO 1712 Office: (907) 265-6342 Mobile: (713) 449-2197 Loepp, Victoria T (DOA) From: Sylte, Hanna <Hanna.Sylte@conocophillips.com> Sent: Tuesday, January 24, 2017 3:24 PM To: Loepp, Victoria T (DOA) Subject: CD5-99A (PTD 2161220) Updated Pressure Test Values Follow Up Flag: Follow up Flag Status: Flagged Victoria, Due to a better understanding of the casing wear seen on the 7-5/8" casing for CD5-99 (PTD 2161220), we are planning to limit the IA pre -frac pressure test to 3500 psi instead of 3850 psi as stated in the sundry application. We are planning to hold 3400 psi on the annulus during the frac, with 500 psi held on the backside. This should still satisfy the requirement to test to 110% of the maximum anticipated pressure differential. Please let me know if you approve this change or have any questions or concerns. AOGCC Required Pressures [all in psi] Previously Submitted Updated Pressures Maximum Predicted Treating Pressure (MPTP) 6,000 6,000 Annulus pressure during frac 3,500 3,400* Annulus PRV setpoint during frac 3,600 3,500 7 5/8" Annulus pressure test 3,850 3,500 OA Pressure during frac 500 3 1/2" Tubing pressure Test 4,600 4,600 Nitrogen PRV 7,125 7,125 Highest pump trip 6,925 6,925 *Allowance of 3680 psi IA pressure during frac based on 3500 psi IA test - 10% + 500 psi in OA. Thank you, Hanna Sylte Associate Completions Engineer ATO 1712 Office: (907) 265-6342 Mobile: (713) 449-2197 THE STATE 'ALASKA GOVERNOR BILL WALKER Hannah Sylte Completions Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510 Re: Colville River Field, Alpine Oil Pool, CRU CD5-99A Permit to Drill Number: 216-122 Sundry Number: 316-645 Dear Ms. Sylte: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. Foerster F Chair DATED this18 a y of January, 2017. RSD SIS t, 144:,N 2 6 2� 7 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 ECEIVFn D F C 2 9 2016 o;s 11 18i)� 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate 0 Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: ❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips , Exploratory ❑ Development Eli Stratigraphic Service El 216-122 ' 3. Address: 6. API Number: P. O. Box 100360, Anchorage, Alaska 99510 50-103-20748-01-00 ' 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? co y3ar) CRU CD5-99 A Will planned perforations require a spacing exception? Yes ❑ No 9. Property Designation (Lease Number):M08 )38�ZZ)j 1 10. Field/Pool(s): ASRC NPR4, ASRC NPR2, 9391 Colville River Unit, Alpine Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 27,128' , 7,716' 27,070' 7,715' • 7,500 Casing Length Size MD TVD Burst Collapse Structural Conductor 84' 20" 115' Surface 2305' 10 3/4" 2,337' 2,182' Intermediate 15,539' 7 5/8" 15,570' 7,564' Production Liner 11,819' 41/2" 27,071' 7,715' Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: ng Grade: Tubing MD (ft): See Attached Schematic See Attached Schematic 3 1/2" TL8:11 15,252' Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): Baker Premier Production Packer, no SSSV 14,511' MD no SSSV 12. Attachments: Proposal Summary ❑ Wellbore schematic ❑✓ 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑� • Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 1/29/2017 OIL .. WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Hanna Sylte, 907-265-6342 Email Hanna.Sylte@ConocoPhillips.com Printed Name Hanna SylteTitle Completions Engineer �c 144, 5y4,_ zW-e 7J I^_/ h oM�plG+iun3 5"fgv- It o7-i�"_ I K dq o201 �v Signature Phone 907-265-6342 Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: Post Initial Injection MIT Req'd? Yes ❑ No C �i Spacing Exception Required? Yes No Subsequent Form Required: G _ RSDIMS JF,3 ] 2 6 201 ❑ ,d APPROVED BY Approved by- COMMISSIONER THE COMMISSION Date: V / - l `ic o n� (� � /fj L Submit Fchm and Farm 10-403 evised 11/201///Vpproved p IIc tIo is valid for 12 m nt s,�F(` thv0gt^o I.Attachments in Duplicate 113<<� / ` C-Dw 114-1201 WINS PROD ConocoPht'illips - wellAttTitrutes !V$S�,)11C. W11ImdI6APWWI rMN 501032074801 ALPI) C C'J+aeA. t^✓.`t.•�if 6 9.56.0 AN nowed vtacar aceamec taxa0 - auneM iwwwi��i Lac, Tau: ides' -I Skin Patch 748' billing Demcrtptlon PRODUCTION LINER Com 15.246.6 CD5.99A M64 I HANGER Max Angle & MD TD Wetmore PROD a 11,0{7 MD } 92.08 24,.'.8 a B y ) 27,12E Baker Exprm-s Frac, 5lee3'e *11(2125' iso. 2.073' 2.073 4mwlESM1 Lest Wtk seat) Grit SEMI Rig RelemaB D , 11/3072016 TRACK La Mon By ppTDven EIIA 11Y'02016 2.035 seat) lep h(RKB) Six Dapth fmll _ W ileal 14 Graf Tcp TbrVed 115.0 145.0 T8.60 B bptn (rtKB) 2.337.1 set Daprn IT,.Ti._ "Lem it G13da 2,'.52.: 45.50 L -W Top Thread Hyc!W3 iepth (rERB) 15,5-10.6 sad capt a jrmi-';Lan )Y._ tai 7,564..33 29.70 L -M Tap Tnreed ET014 reptn (it<e} 2.456.0 set C3 h ffvcf-.- W " )L hada 2-7--&5 29,033 fi0ksi ep Turaset aptn(r")D 27.071.0 1m--• xm)1_t1f.lW 7.714.6 12£w L -EU Top Tnrsan 717 Com 15.246.6 7,515.5 M64 I HANGER Liner Hanger,DGFLPMMdZ:jWpsi 4.151U 16.124.4 7.59:.5 SMS FRAC PORT Baker Exprm-s Frac, 5lee3'e *11(2125' iso. 2.073' 2.073 seat) 16,B20.4 7.596.1 90126 FRACPOP.T Baker Express Frac Sleeve 010(2.063' ball, 2.035' 2.035 seat) 17.737.6 7,6MO 89.88 FRAC PORT Baker Express Frac Skeve49(2tit1'bat TBW 1.946 scar MsaGC^5. 13.L-99 seat) 1£,571.2 7.675.4 89.ro FRAC PORT Baker Express Frao SIMe M(t.BW ball, 1.8$7' 1.833 Tubing Description Mg Ma... ID (int Top ( K8) seat) on 19.360.5 7,624.6 F 89.05 FRAC PORT I Baker Express Frac Sleeve 07(1.875' bslL 1.67$' I 1.623 xar�.1a3t3.1 seat) auaadr:ta"Tras 22,861.6 7,66',.7 57.16 FRACPORT Baker Express Frac Sl"a#3(1.GW ball, 1.573' 1.573 seat) Cs�Oe: r-Zmq Ee:saGtapa;_t 24,000.6 7,684.3 8£.61 FRACPQRT Baker Express Frac Skeve#2(1,563' rill. 1.511' 1.511 Seat) teor9nl LaS�9 25,1528 7,694.2 89.67 FRAC PORT Baker Express Frac Sleeve 81(1,495 ball, 1.465' 1.465 scar MsaGC^5. 13.L-99 seat) Tubing Strings Tubing Description Mg Ma... ID (int Top ( K8) set DapN (rE.. Dep h (TVC{ j... w (I } Grana Tap Cortrt on lac :t4stls Uppercompetion 31:2 2.33<" 0.0 14,490.1 7,348.8 9.30 L-80 WM563 strh:g w7 Seal Assy Completion Details NOMM ID Top (n)(B) Top jr M) JMW) Top Ind (`) Nem Des Co. (110) 31.1 0.11 Hanger FMC 4-1f2Tubing Harper UP 3.958 Tamm-acmr l3,s^a.o 2,754,7 2.026.1 37.15 Nippur --X Larding Nipple, 3.11T,X2813',EUE4kd 2813 afute aaae; 13,55'.8 , ; 14,437.1 :,325.2 67.70 Gsugel Pump SL8 Gauge Carrier. 9,30 LA0 EUE4hd PinxPinvdtop 2.897 Fx�rsnat sa; ra,w.r Sensor coupling 14,45£.9 7,337.4 G8.13 Locator Norio 2.970 14,459.9 7,3sr.7 66.15 Seal Assam* Sealassebiy 8040(6.9 spaceout4rovilaATleovated) 1 2.992 Tubing 09et9�tlon dng Me... 16(kuj Top (. K9 Sa Depm (Tc,.. s D (TVD)(... ( ) Grade Tapcon"Witin �x¢e:-(nAracY ls.lsa.T `CuVPuGed"%bing- 31,2 2.992 39.0 14.554.0 7,371.3 9,30 LSn EUE-&rd xo-ltcaes; tgst� Production Completion Details iaobS i5. �1 Namtnsl iD Top (TtKB} Top rP.'D) (rtKB) Top Int (') AM Dem Com 011 31.0 31.0 0.11 Hanger FMC 4-UrTubing HangerTXP 3.358 ,Lae 5>NG 1x51. 2,132.2 2.024.1 37.10 Nipple -X landing Nipple. 3-L2',X 2.813, EUE-8rd 2.002tvd 2.813 14,525.2 3,361.3 59.50 Gauge1Pump SLS Gauge Carrier, 9,38 L80 EUE4W Pin%Pinv#" 2.897 Same, coupling Tubing Diecripcon StringMa- ..JIB Itn) Top(TtKB) Dep (T_ Deph(T1fi}(... 1 } Grads Top conn n +.,te .slauxlmc a�aerc 2nd PackerAssy 5 4.000 14,465.9 14,564.0 7,374.1. 1263 L-80 1B50.A1pSs IYfECihrE]L4T_,2L1-,5,,705 Completion Nominal ID Top (n-) Top(TVD)VMS) Top and(') hem Dom Com [in) 14.465.9 7,340. 6627 PER (Polished Baker PBR 80-00 4.000 Bore Receptacle) 14.5115 7,356.6 6921 Packer Packer, Baker Premier Pmdwtion Packer 2.870 14,531.5 7.365,9 69.77 Nipple --X Landing Nipple, 3lfT.X 2.813-, EUE4kd XX _:<=U9 2.813 nstalkd 14,556.2 7,372.0 1 :0.15 1 Bess Assembly Overshot pecking V.ST cr.sn-,--.e' 3.600 14.%2.8 7.374.3 70.30 1 MAShoe 5.480 TUotng Desvlpt n gffa... 1D(� - Top KB) Sb D� tit sat Doptm (TYD{(...w (ic�m; srs2a Top Conor cn 'Lowu*Tubing- 31r2 2992 14,554.1 15,252.0 7,527.4 5.=- -�I 110 Hyd563 Production Completion Details Nominel ID Top{rBCB} Top (P!D)(rtKB} I Top tnt 1.1 item use Co. (in} 14,601.6 7,387.0 71.56 Nipple -X HIPPLE,LANDING,317P,X,2.813',Nydri15S3-High 2813 Burst 71.9' 15,21$1 7,514.4 M37 Nipple-XH NIPPLE-LANDING,31f2-,-N,2.75'No Go,EUEBROM 2750 vd .875' l0 RHC pkg itstaUsd 15,2221 7,515.4 SM42 Lxstar MLcha6icalbc3tar,EUE(6.41"OObcmo 3.000 11251.0 7,520.2 M.fiB Mule Shoe SakerWLEG 3.010 Notes: General & Safety F= Date Annotation z:,�anlrnw cus ~15r 12"16V76_ _.NOTE__.._ Section 1 - Affidavit 10 AAG 25.283 (a)(1► Exhibit 1 is an affidavit stating that the owners, landowners, surface owners and operators within one-half mile radius of the current or proposed wellbore trajectory have been provided notice of operations in compliance with 20 AAC 25.283(a)(1). TO THE ALASKA OIL AND GAS CONSERVATION COMMISSION Before the Commissioners of the Alaska Oil and Gas Conservation Commission in the Matter of the Request of ConocoPhillips Alaska, Inc. for Hydraulic fracturing for the CD5-99A Well under the Provisions of 20 AAC 25.280 STATE OF ALASKA THIRD JUDICIAL DISTRICT } AFFIDAVIT OF Garrett B. Haag W Garrett B. Haag, being first duly sworn, upon oath, deposes and states as follows: My name is Garrett B. Haag. I am over 19 years old and have personal knowledge of the matters set forth herein. 2. 1 am Staff Landman for the well operator, ConocoPhillips Alaska, Inc. ("CPAI") 3. Pursuant to 20 AAC 25.283 (1) CPAI prepared the attached Notice of Operations ("Notice"). 4. On December 28, 2016, CPAI sent a copy of the Notice by certified mail to the last known address of all other owners, landowners, surface owners, and operators of record within a one-half mile radius of the current proposed well trajectory. Subscribed and sworn to this 281h day of December, 2016. J�,4 Garrett B. Haag STATE OF ALASKA ) H THIRD JUDICIAL DISTRICT ) This instrument was acknowledged before me this 2811 day of De ember, 2016, by Gar tt B. Haag. Notary Public, State of Alaska My Commission Expires:i t, �.;;gip;/�'•S�� ���f��, NOTARY: `y' December 28, 2016 To: Operator and Owners (shown on Exhibit 2) P. O. BOX 1.00360 ANCHORAGE, ALASKA 99510-0360 Garrett B. Haag, Staff Landman Land Department, ATO 1480 Phone (907) 265-6297 Fax (907)263-4966 Garrett.B.Haag@,cop.com VIA CERTIFIED MAIL Re: Notice of Operations pursuant to 20 AAC 25,283 (1) for CD5-99A Well ASRC NPRA-02, ASRC NPRA-03, ASRC AA092347, ASRC NPRA-04, ADL387208, ASRC AA092344, ADL387209, AD1.,380077, ADL388902, ADL388905, Colville River Unit, Alaska CPAI Contract No. 203488 Dear Operator and Owners: ConocoPhillips Alaska, Inc. ("CPAI") as Operator and on behalf of the Colville River Unit ("CRU") working interest owners, hereby notifies you that it intends to submit an Application for Sundry Approvals for stimulation by hydraulic fracturing pursuant to the provisions of 20 AAC 25.280 ("Application") for the C.D5-99A Well (the "Well"). The Application will be filed with the Alaska Oil and Gas Conservation Commission ("AOGCC") on or about :December 29, 2016. This Notice is being provided pursuant to subsection of 20 AAC 25.283. The Well has been drilled as a directional horizontal well on. leases, ASRC NPRA-02, ADL387208, A 2. ADL387209, ADL�,M77, and ADL3�O5, as depicted on Exhibit 1 and has locations as follows: Location FNL FEL ! Township Range Section Meridian Surface 288' 21420' T11N R4E 18 Umiat Heel 1,400' 2,131' T11N R4E 21 Umiat Bottomhole 771' 1,647' T11N R4E 34 Umiat Exhibit I shows the location of the Well and the lands that are within a one-half mile radius of the current proposed trajectory of the Well, including the reservoir section ("Notification Area"). Exhibit 2 is a list of the names and addresses of all owners, landowners and operators of record of all properties within. the Notification Area. Upon your request, CPAI will provide a complete copy of the Application.. If you require any additional information, please contact the undersigned. Sincerely, A 6 Garrett B. Haag Staff Landman Attachments: Exhibits 1 & 2 Exhibit 1 - 11 N --- ---I 3E ADUS7207 A{SbtQ=lciRR2 ` i j Alpine Pal C®5\ i �'� ! [tiL1L387208: 11SRG klPR4 i I--- ADL300075 -�--- s`9,9 N - - r ADL380077 A SRC-AA0923U � 0 1 y I E RtAteme9- WIDffia: CmcafffillipiAra3kaTeahmalDaMasaPTMN II li C 646A Open tat ri all ASR¢-tYPR2 !'— — W& A.WITnad i Q1Q, IM, F.. F60 gaff g�ADL31 ® vvw-V'mT'a'k me, i �--iAb"wPAI T11NR4E 1--- Kupawk F` ASRC.NPRA T1QNR4E CanracoPhillips QaTug Pkv Alaska, Inc. .................. N cA BiMl waslh�ps. 0 0.2 0.4 0.6 0.8 1 Leas Pbt� CPAIi Leases Miles Dates IMM016 RtAteme9- WIDffia: CmcafffillipiAra3kaTeahmalDaMasaPTMN Exhibit 2 List of the names and addresses of all owners, landowners and operators of all properties within the Notification Area. Operator & Owner: ConocoPhillips Alaska, Inc. 700 G Street, Suite ATO 1226 (Zip 99501) P.O. Box 100360 Anchorage, AK 99510-0360 Attention:.Erik Keskula, NS Development Manager Owner (Non -Operator): Anadarko E&P Onshore LLC P.O. Box 1330 Houston, TX 77251.-1.330 Attention: Mike Nixson, Director Land - Alaska Landowners: Arctic Slope Regional Corporation 3900 C Street, Suite 801 Anchorage, Alaska 99503-5963 Attention: Teresa 1mm, Resource Development Manager State of Alaska Department of Natural :Resources Division of Oil and Gas 550 West 7th Avenue, Suite 1.100 Anchorage, AK 99501 .Attention: Chantal Walsh, Director Surface Owner: K.aukpik Corporation P.O. Box 89187 Nuigsut, AK 99789-0187 Attention: Joe Nukapigak, President Section 2 — Plat 20 AAC 25.283 (a)(2) Plat 1: Wells within .5 miles x"11 N 1 ASRC-NPR2 \ j Alpine PA CD5 i \ i ASRC-NPR4 ' i COS99 cam q ASRC-AA0923" • CD5-99A Frac Points CD5-99A Open Interval CD5-99A Well Track 1/2 Mile Frac Point Buffer 1/2 Mile Well Track Buffer Wells within Frac Point Buffer Alpine PA Nanuq Kuparuk PA Qannik PA ADNR Sections BLM Townships CPAI Leases ADL387208 Nanuq Kuparuk PA ASRC-NPR2 L T11 NR4E ASRC-NPR4 T10NR4E 'N 0 0.2 0.4 0.6 0.8 1 Miles ADL387207 ADL380076 Qannik PA ConocoPhillips Alaska, Inc. CD"9A Lease Plat Date: 12/22/2016 Heterences: Well Data: ConocoPhill ps Naska Technical Database (STDB) Table 1: Wells within .5 miles Well Name API Drill Site Status Well Type CD4 -26 501032060000 CD4 ACTIVE INJ CD4 -318A 501032051901 CD4 ACTIVE PROD CD4 -321 501032053600 CD4 ACTIVE INJ CD4 -322 501032055100 CD4 ACTIVE INJ CD5-99 501032074800 CD5 PA N/A ISOLATED CD5-99AL1 501032074861 CD5 INACTIVE PROD- N/A SECTION 3 — FRESHWATER AQUIFERS 20 AAC 25.283(a)(3) There are no freshwater aquifers or underground sources of drinking water within a one-half mile radius of the current or proposed wellbore trajectory. See Conclusion number 3 of the Area Injection Order AIO 018.000- Colville River Field, Alpine Oil Pool: Enhanced Recovery Project, which states "No underground sources of drinking water ("USDWs") exist beneath the permafrost in the Colville River Unit area." SECTION 4 — PLAN FOR BASELINE WATER SAMPLING FOR WATER WELLS 20 AAC 25.283(a)(4) There are no water wells located within one-half mile of the current or proposed wellbore trajectory and fracturing interval. A water well sampling plan is not applicable.v SECTION 5 — DETAILED CEMENTING AND CASING INFORMATION 20 AAC 25.283(a)(5) All casing is cemented in accordance with 20 AAC 25.52(b) and tested in accordance with 20 AAC 25.030 (g) when completed. See Wellbore schematic for casing details. SECTION 6 — ASSESSMENT OF EACH CASING AND CEMENTING OPERATION TO BE PERFORMED TO CONSTRUCT OR REPAIR THE WELL 20 AAC 25.283(a)(6) Casing & Cement Assessments: 10 & %" casing cement pump report on 8/30/2016 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8ppg class G cement, displaced with 10ppg mud. Full returns were seen throughout the job. The plug bumped at 950 psi and the floats were checked and they held. The 7 & 5/8" casing cement report on 10/13/2016 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8ppg class G cement. Full returns were seen throughout the job. The plug bumped at 670 psi, and the floats were checked and they held. Summary All casing is cemented in accordance with 20 AAC 25.030 and each hydrocarbon zone penetrated by the well is isolated. Based on engineering evaluation of the wells referenced in this application, ConocoPhillips has determined that this well can be successfully fractured within its design limits. SECTION 7 — PRESSURE TEST INFORMATION AND PLANS TO PRESSURE -TEST CASINGS AND TUBINGS INSTALLED IN THE WELL 20 AAC 25.283(a)(7) On 9/1/2016 the 10-3/4" casing was pressure tested to 3,500 psi for 30 mins. On 11/19/2016 the 7-5/8" casing was tested and a leak was found. A casing patch was installed, and on 11/29/2016 the 7-5/8" casing and casing patch was pressure tested to 3,500 psi for 30 mins. On 11/29/2016 the 3.5" tubing was pressure tested to 3,500 psi for 30 minutes. The 3.5" tubing will be pressure tested to 3,500 psi prior to frac'ing. The 7-5/8" casing will be pressure tested to 3,500 psi prior to frac'ing. SECTION 8 — PRESSURE RATINGS AND SCHEMATICS FOR THE WELLBORE, WELLHEAD, BOPE AND TREATING HEAD 20 AAC 25.283(a)(8) Size Weight Grade API Burst API Collapse 10 & 3/4" 45.5 L-80 2,090 psi 3,580 psi 7 & 5/8" 29.7 L-80 6,890 psi 4,790 psi 3.5" 9.3 L-80 10,160 psi 10,540 psi Table 2: Wellbore pressure ratings Stimulation Surface Rig -Up m Minimum pressure rating on all surface treating lines 10,000 psi Main treating line PRV is set to 95% of max treating pressure IA parallel PRV set to 3500 psi Frac pump trip pressure setting are staggered and set below main treating line PRV Tree saver used on all fracs rated for 15,000 Pop Off Tank Pump Truck W ELLHE VAL% CLOS r Stimulati®n Tree Saver OPEN POSITION (PRIOR TO MANDREL INSERTION) DN .TION OPERATED VALVE OPERATED VALVE WELL V/ QUAD PA( ASSEW PLACE IN TI CLOSED POSITION (NWIDP.EL INSERTED) • The universal tool is rated for 15,000 psi and has 84" of stroke. • Tool ID 2.25" down 4 1/2 tubing and 1.75" down 3 1/2 tubing. • Max rate with 2.25" mandrel is 60 bpm and with 1.75" mandrel 36 bpm VENT - VALVE OPEN Alpine Wellhead System SECTION 9 — DATA FOR FRACTURING ZONE AND CONFINING ZONES 20 AAC 25.283(a)(9) CPAI has formed the opinion, based on seismic, well, and other subsurface information currently available that: The Alpine A interval is approximately 30' TVD thick at the heel of the lateral and generally maintaining the same thickness to the toe. The Alpine A sandstone is very fine grained and quartz rich, with a coarsening upward log profile. Top Alpine A is estimated to be at 16,043' MD/7,518' TVDSS. The estimated fracture gradient for the Alpine A sandtone is 12.5 ppg. The overlying confining zone consists of greater than 470' TVD of Miluveach, Kalubik and HRZ mudstones. The estimated fracture gradient for the Miluveach is 15 ppg and for the Kalubik and the HRZ is 16 ppg. Top HRZ was encountered at 13,667' MD/6,940' TVDSS. The underlying confining zone consists of approximately 1800' of Kingak shales. The estimated fracture gradient for the Kingak shales is 15-18 ppg. Fracture gradient increases down section. The top of the Kingak interval ranges from 7550' TVDSS at the heel to 7645' TVDSS at the toe of the well (no MD as the Kingak interval was not penetrated in the CD5-99A wellbore). SECTION 10 — LOCATION, ORIENTATION AND A REPORT ON MECHANICAL CONDITION OF EACH WELL THAT MAY TRANSECT CONFINING ZONE 20 AAC 25.283(a)(10) The plat shows the location and orientation of each well that transects the confining zone. ConocoPhillips has formed the opinion, based on following assessments for each well and seismic, well, and other subsurface information currently available that none of these wells will interfere with containment of the hydraulic fracturing fluid within the one-half mile radius of the proposed wellbore trajectory. Casina & Cement assessments for all wells that transect the confining zone: C134-26: The 7-5/8" casing cement pump report on 5/16/2009 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Class G cement, displaced with 10 ppg LSND mud. Full returns were seen throughout the job. The plug was bumped at 1270 psi and the floats held. C134-318: The 7" casing cement pump report on 8/30/2006 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Class G cement, displaced with 10.2 ppg mud. Full returns were seen throughout the job. The plug was bumped at 1100 psi and the floats held. CD4 -321: The 7" casing cement pump report on 10/21/2006 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Class G cement, displaced with 10.5 ppg mud. Full returns were seen throughout the job. Did not bump plug. Pressure was held on the cement head. CD4 -322: The 7" casing cement pump report on 8/12/2007 shows that the job was pumped as designed, indicating competent cementing operations. The cement job was pumped with 15.8 ppg Class G cement, displaced with 9.6 ppg brine. Full returns were seen throughout the job. The plug was bumped at 1,500 psi and the floats held. C135-99: On 9/30/2016 CD5-99 was plugged and abandoned as per state regulations SECTION 11 — LOCATION OF, ORIENTATION OF AND GEOLOGICAL DATA FOR FAULTS AND FRACTURES THAT MAY TRANSECT THE CONFINING ZONES 20 AAC 25.283(a)(11) CPAI has formed the opinion, based on seismic, well, and other subsurface information currently available that two faults or fracture systems transect the Alpine A formation or enter the confining zone within one half mile radius of the wellbore trajectory for CD5-99A. These faults were interpreted from seismic data prior to drill and are seen on log data while drilling the lateral. The first fault set (2 faults) has a combined throw of 26' (17' and 9') and the second has 8' of throw. Any faults that are within the half mile radius of the wellbore do not extend up through the confining interval and fracture gradients within the top seal intervals would not be exceeded during fracture stimulation and would therefore confine injected fluids to the pool. CPAI has formed the opinion, based on seismic, well and other subsurface information currently available that the apparent faults will not interfere with containment. Based on our knowledge of the principle stress direction in the Alpine A formation, along with the well path, all of the fractures will be longitudinal, running parallel to the wellbore. Because of this the fractures will only intersect faults that intersect the wellbore. We do not expect any of our hydraulic fractures to intersect faults seen in this wellbore. If there are indications that a fracture has intersected a fault during fracturing operations, ConocoPhillips will go to flush and terminate the stage immediately. Table 3 —Drilled faults Vertical Well Depth Depth Displacement Loss Name MD (ft) TVDSS (ft) (bbls/hr) CD5-99 22,231' 7,578' 17' None CD5-99 22,332' 7,652' 9' None CD5-99 26,940' 7,711' 8' None Table 3 —Drilled faults Plat 2: CD5-99A Fault Analysis 11 N R3E i ASRC•NPR2 I Alpine PA i i ASRC-NPR4 I "Os t------ ADL387208 ADL387207 A DL380075 Qannik PA ADL380077 ASRC-AA092344 • GD5-99A Frac Points GD5-99A Well Track 1.2 Mile Frac Point Suffer Q 112 Mile Well Track Buffer Active Well Segments in Frac Point Buffer Abandoned Well Segments in Frac Point Buffer Fault Segments in Frac Point Buffer Alpine PA L — _ j Nanuq Kupatuk PA Qannik PA ADNR Sections Nanuq Kuparuk PA ASRC-NPR2 T11 NR4E T10NR4E N BLM Townships 0 0.2 0.4 0.6 0.8 1 Miles CPAI Leases ConocoPhillips Alaska, Inc. CD"9A Fault Analysis Date: 12/22/2015 References: Well Data: ConccoPhiflips Alaska Technical Database (STDB) CD5-99A Fracture Stimulation Area of Review Top of A -sand Top of A-Sand Topof Cement Top of Cement Top of Cement Cement Operations WELL NAME STATUS Casing Size Oil Pool Reservoir Status Zonal Isolation Mechanical Integrity Oil Pool (MD) (TVDSS) (MD) (TVDSS) Determined By Summary ✓ 7,556' 14,450' Sonic Lag Open hole and perforations for Production packer at 15,146' and 1239 sx 15.8 ppg class G 8/13/15, Passing MIT -IA CD4 -26 Injector 7-5/8" 16,451' 7,342' injection TOC at 14,450' MD ✓ cement to 2458 psi Production Packer at 14,024' and 200 sx 15.8 ppg class G 4/30/2016, Passing CMIT CD4 -318A Producer 7" n/a n/a 12,000' 5,924' Calculated Slotted liner for production TOC at 12,000' MD t/ cement to 2550 psi Production packer at 18,077' and 292 sacks of 15.8 ppg class G 11/11/15, Passing MIT -IA CD4 -321 Injector 7" 19,117' 7,600' 17,850' 7,040' Calculated Perforations for injection TOC at 17,850' ✓ cement to 3300 psi Production packer at 15,226' and 177 sx 15.9 ppg class G 6/12/2015, Passing MITIA CD4 -322 Injector 7" 19,179' 7,504' 17,922' 7,009' Calculated Perforations for injection TOC at 17,922' ✓ cement to 2511 psi 669 sx of 17 ppg class G CD5-99 PA N/A 16,043' 7,518' .2,139' 2,029' Calculated NA PA, Cement Plugs NA cement SECTION 12 — PROPOSED HYDRAULIC FRACTURING PROGRAM 20 AAC 25.283(a)(12) CD5-99A was completed in 2016 as a horizontal producer in the Alpine A formation. The well was completed with 3.5" tubing and a 4.5" liner with ball actuated sliding sleeves. After the 1 st stage we will shift a sleeve to close off that section of the lateral. We will then pump the 2nd stage and drop a ball (progressively getting larger) after each remaining stage, these balls will provide isolation from the previous stage and allow us to move from the toe of the well towards the heel. Proposed Procedure: Halliburton Pumping Services: (Alpine A Frac) 1. Conduct Safety Meeting and Identify Hazards. Inspect Wellhead and Pad Condition to identify any pre existing conditions. 2. Ensure all Pre -frac Well work has been completed and confirm the tubing and annulus are filled with a freeze protect fluid to 2,000' TVD. 3. Ensure the 10-403 Sundry has been reviewed and approved by the AOGCC. 4. MIRU 16 clean insulated Frac tanks, with a berm surrounding the tanks that can hold a single tank volume plus 10%. Load tanks with 100° F seawater (approx. 1,000 are required for the treatment with breakdown, maximum pad, and 450 bbls usable volume per tank). 5. MIRU Stinger Tree Saver Equipment and HES Frac Equipment. 6. PT Surface lines to 9,000 psi using a Pressure test fluid. 7. Test IA Pop off system to ensure lines are clear and all components are functioning properly. 8. Bring up pumps and drop 3 balls to open sleeves that are not planned for proppant due to insufficient reservoir thickness. Slowly increase annulus pressure from 2,500 psi to 3,500 psi as the tubing pressures up. 9. Pump the 300 bbl breakdown stage (25# Hybor G) according to the attached excel HES pump schedule. Bring pumps up to maximum rate of 20 BPM as quick as possible, pressure permitting. Ensure sufficient volume is pumped to load the well with Frac fluid, prior to shut down. 10. Perform a hard shut down, Obtain ISIP and fluid efficiency estimates. 11. Pump the Frac job by following attached HES schedule @ 25bpm with a maximum expected treating pressure of 7,500 psi. 12. RDMO HES Equipment. Freeze Protect the tubing and wellhead if not able to complete following the flush. 13. Well is ready for Post Frac well prep for flowback (Slickline and possibly CTU). CUSTOMER LEASE FORMATION C—ooehillips Alaska, lnc. CD599A ASand AN 50.103-LI]4g-01 SALESORDER DATE BFD(Ib/pn/) BHSTf-F/ Maa Pressure sl s.5n 165 NAWBUIXTCN ""- ;,:��;�,„ ]0.3140069 -]61.Z39309 U uid Add/tives D"Addidves Prop Slurry Clean Clean Slump: Prop Stage Interval L,=.I0D MO.67 CL -22 UC CL -31 LVf-200 WG -36 BE -6 OptSWdll 5p Treatment StaHe flultl Stage Prpppant Conc Rate Volume Volume Volume Total The Time . Bu11d . um4m6. . . A W eiadw &ocv enabr Interval Number Oescrl Ion Descrl [Ion Descrl [Ian pm pl i bbl /br hh:mm:rr hh:mmm 'I Lo-Surl300D I MO -67 CL -22 UC CL -31 LW -200 WG -36 BE -6 OptlFlo-III SP _ (9pm) (qpm (go.) (opm) (gpm) ppm ppm ppm ppm Max Addklve Rale 1.1 1.1 0.9 0.5 1,050.0 26.3 0.2 2.1 0.5 - MN Ad Rale 0.2 0.2 0.2 0.1 2100 5.3 0.0 0.4 0.1 lanes 1-4 chemlcat 204,935 4,879 320,712 201 187 160 84 4200 BOB 30 401 16 Zonis 5-8 Chemicab 157.9D3 3,745 .. _. 3Eo529 ... _ :.T53 252 `137 59 4200 -- 3768 _,., . 3Di -.4 ConocoPhillips Alaska, Inc. - CD5-0N Planned Design 2 Hydraulic Fracturing Fluid Product Component Information Disc Fracture Dale 2016-1247 Slate: Alaska County: Harrison Be APIN—lo . $010320748 NORTH SLOPE Operator Name: EMS Well Nameand Number C0549A Longitude: 461.22 Latitude: 7031 Long&.t Projection IndiaNFederal:: Production Type: True Vertical Depth Total Wader Volume (gaff•: 323,839 Hydraulic Fracturing Fluid Composition: Chemical Maximum Abstract Maximum Ingredient Ingredient Trade Name Supplier Purpose Ingredients Service Concentration in Additive Concentration in en Ingredient Mass Comments Company First Name Last Name Email Phone Number (CAS (% by m) HF Fluid I% by lbs #) mass)'• Seawater op—t., Base Filed Water 16.00'.+ 75.370275 2661171 Density=6560 BES MICROBIOCIDE H1I2xxtan Bodde Listed Below Listed Below 0 NA CL-22 UC H.Usaon Crosfinker Listed Below Listed Below 0 NA CL-31 CROSSLINKER H"b"e'n Cross6nk. Listed Below Listed Below 0 NA LOSURF3000 Hadlbunon Non4onic Sudactam Listed Below listed Below 0 NA MOE7 HaWLurbn PH ConOalAddOve Usled Below Latest Below 0 NA 0 TIFLO-111 DELAYED Hallbumm, Breaker Laud Below Listed Below RELEASE 0 NA BREAKER SP BREAKER Ha86udon Breaker Usted Below Listed Below 0 NA WG36 GELLING Halliburton Gelling Agent Listed Below Listed Below AGENT 0 NA LVr-200 pervace Add&. Listed Below Luted Below 0 NA Xums Wan6 20/40 Wan1i Industry Additive Listed Below Usted Below Development 0 NA Co. Lid In radenh Listed Above Listed Above 1,2,4 Tnme benzene 9553E 1.008 o.0006m 25 2-Bmmo-2-mi1m-1,3 a dioI 5251-7 1W.00° 0.0014_4 50 Tuck, 2Denise 1flounton, 3000 N. Acrylate polymer Proprietary 1.005 0.000958 34 Sam Houston Pkwy Hallburbn Denise Tuck E., Houston, TX Denise.Tuck@ 281-871-6226 Halliburton.omm 77032,281571- 6226 Ammonium .01.1e 7727-54-0 1Jo.0J1 0.01831'. 643 corundum 1302-74S 55.005 1o. 611638 374662 CrysiaLm, sBm, q,.M 14608.60.7 30.004 o.0o5565 197 curetl acryfic resin Proprietary 30.00% O. x05468 193 Halliburton Denise Tuck Denae.Tuck@ 281571-6226 Hallburton.com Ethanol 64-1]5 60.005 0.041401 1462 Gtm, 0 90(x130-0 100.008 0.227375 8028 Heavya mrelb petroleum roaphtha 64742-948 ?n. Jee 0.0'0708 731 H dmbeated M,11i11ate, LI htwc9-i6 5474247-8 100.005 1.643938 58044 Mull. 1302-935 45..05 6.683405 W6558 Naphthalene 91-203 5.008 0.003458 122 Oxyialed phemsi. resin Proprietary .0.005 0.02760? 975 Hstflur on Denise Tuck Denlse.Tuck@ 281-571-5226 HalGbudon.com Poly(oxy-1,2ethanadry), alpha-(4 mmylpheny0amega-hydmxy-, 12708757-0 S. colo 045% 122 branched Polasslum formate 590.29+5 60.009 0.057115 2017 Palaasiumhydroxide 1310-583 5.004 0.00221% 79 Polasdum medaborale 13709-949 6..004 0,036515 937 Sodium carbo meth loclu1— 9004324 1.004 0.000955 34 Sod mchladde 7647-145 4.005 :.143332 110951 Sodium collate 283632-0 1.008 0.000958 34 Sodhmnh dre.1de 1310-73-2 30.002 0.023608 1010 Sodium persulf.te 777527-1 100.005 0.000425 15 Sodb4msu11ate 775752E 0.103 0.030005 1 UleAte, calcined 92908-333 .0.004 0.05711% 2017 Wale, T732-185 Inc...), 0.150415 5313 • Total Water Volume sources may include fresh water, produced water, and/or recycled water " IMormation is based on the maximum potential for concentration and thus the total may be over 100A Note: For Feld Development Products (products that begin with FDP), MSDS level only information has been provided. All component information listedwss obtained from the supplier's Material Safety Data Sheets (MSDS). As such, the Operator is not responsible for inaccurate and/or incomplete information. Any questions regarding the content of the MSDS should be directed to the supplier who provided it The Ocoupabonal Safety and Health Administration's (OSHA) regulations govern the criteria for the disclosure of this information. Please note that Federal Law protects "proprietary",'trade secret", and "confidential business information' andihe criteria for howthis information is reported on an MSDS is sub'ectto 29 CFR 1910.1200 and Appendix D. CD5-99A Alpine A Multi -stage Frac Model Frac Design Stage 1 Stage Number Fluid Description Stage Description Prop Conc. (ppg) Proppant Description Design Clean Volume (gal) 1-1 Freeze Protect 2,100 1-2 Load Well 1,000 1-3 25# Hybor G Mini -Frac 13,000 1-4 25# Linear Flush 7,758 1-5 Shut -In Shut -In 1-6 25# Hybor G Pad 12,600 1-7 25# Hybor G Proppant Laden Fluid 1.00 Wanli 20/40 4,032 1-8 25# Hybor G Proppant Laden Fluid 2.00 Wanli 20/40 3,864 1-9 25# Hybor G Proppant Laden Fluid 3.00 Wanli 20/40 3,696 1-10 25# Hybor G Proppant Laden Fluid 4.00 Wanli 20/40 3,570 1-11 25# Hybor G Proppant Laden Fluid 5.00 Wanli 20/40 3,444 1-12 25# Hybor G Proppant Laden Fluid 6.00 Wanli 20/40 2,646 1-13 25# Hybor G Spacer and Drop Ball 630 Frac Design Stage 2 Stage Number Fluid Description Stage Description Prop Conc (ppg) Proppant Description Design Clean Volume (gal) 2-1 25# Hybor G Pad 12,600 2-2 25# Hybor G Proppant Laden Fluid 1.00 Wanli 20/40 4,032 2-3 25# Hybor G Proppant Laden Fluid 2.00 Wanli 20/40 3,864 2-4 25# Hybor G Proppant Laden Fluid 3.00 Wanli 20/40 3,696 2-5 25# Hybor G Proppant Laden Fluid 4.00 Wanli 20/40 3,570 2-6 25# Hybor G Proppant Laden Fluid 5.00 Wanli 20/40 3,444 2-7 25# Hybor G Proppant Laden Fluid 6.00 Wanli 20/40 2,646 2-8 25# Linear Spacer and Drop Ball 630 Frac Design Stages 3-8 FStage umber Fluid Description Stage Description Prop Conc {ppg) Proppant Description p Design Clean Volume (gal) 3-1 25# Hybor G Pad 12,600 3-2 25# Hybor G Proppant Laden Fluid 1.00 Wanli 20/40 3,024 3-3 25# Hybor G Proppant Laden Fluid 2.00 Wanli 20/40 3,024 3-4 25# Hybor G Proppant Laden Fluid 3.00 Wanli 20/40 3,192 3-5 25# Hybor G Proppant Laden Fluid 4.00 Wanli 20/40 6,006 3-6 25# Hybor G Proppant Laden Fluid 5.00 Wanli 20/40 4,452 3-7 25# Hybor G Proppant Laden Fluid 6.00 Wanli 20/40 4,200 3-8 25# Linear Spacer and Drop Ball 630 Totals (8 stages) 25# Hybor G - 317,452 gal 25# Linear - 6,387 gal 16/20 Carbolite - 681,240 lbs Model Results Stages Job Size Top TVD Btm TVD Propped Fracture Avg (Ib) (ft) (ft) Half- Height {ft} Fracture length (ft) Width (in) 1-2 70,000 7498 7573 500 75 0.32 3-8 90,000 7488 7578 520 90 0.34 • Disclaimer Notice: — This model was generated using commercially available modeling software and is based on engineering estimates of reservoir properties. ConocoPhillips is providing these model results as an informed prediction of actual results. Because of the inherent limitations in assumptions required to generate this model, and for other reasons, actual results may differ from the model results. SECTION 13 a POST-FRACTURE WELLBORE CLEANUP AND FLUID RECOVERY PLAN 20 AAC 25.283(a)(13) Flowback will be initiated through PTS until the fluids clean up at which time it will be turned over to production. (Initial flowback fluids to be taken to CD1-01 disposal well until they are clean enough for production.) Wallace, Chris D (DOA) From: Sylte, Hanna <Hanna.Sylte@conocophillips.com> Sent: Wednesday, January 04, 2017 10:23 AM To: Wallace, Chris D (DOA) Subject: RE: Hydraulic Fracturing Sundry Application 316-645 CRU CDS-99A (PTD 2161220) Chris, Thank you for pointing that out, I had listed the incorrect pressure on the application. The MPTP should be 6,000 psi and the pressure tests values have been adjusted accordingly, listed in the table below. Please let me know if you need more information or have questions on any other part of the application, I apologize for this error in the application. AOGCC Required Pressures [all in psi] Maximum Predicted Treating Pressure (MPTP) 6,000 Annulus pressure during frac 3,500 Annulus PRV setpoint during frac 3,600 7 5/8" Annulus pressure test 3,850 3 1/2" Tubing pressure Test 4,600 Nitrogen PRV 7,125 Highest pump trip 6,925 Thank you, Hanna Sylte Associate Completions Engineer ATO 1712 Office: (907) 265-6342 Mobile: (713) 449-2197 -----Original Message ----- From: Wallace, Chris D (DOA) [mailto:chris.wallace@alaska.gov] Sent: Friday, December 30, 2016 9:49 AM To: Sylte, Hanna <Hanna.Sylte@conocophillips.com> Subject: [EXTERNAL] Hydraulic Fracturing Sundry Application 316-645 CRU CD5-99A (PTD 2161220) Hanna, We are reviewing the A -Sand stimulation sundry for CD5-99A. It makes reference to tubing and IA pressure testing to 3500 psi. CD5-99A reference the maximum treating pressure as 7500 psi at 25 bpm and mention the stage IA backpressure of 2500 to 3500 psi. The 110% testing requirement of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) do not seem to be met for these pressures? Please identify the IA popoff pressure and test pressure for 20 AAC 25.283(a)(12) Step 7 of the procedure. Surface rig up diagram states IA parallel PRV set to 3500 psi. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7th Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace@alaska.gov CONFIDENTIALITY NOTICE: This e- mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793-1250 or chris.wallace@alaska.gov. -----Original Message ----- From: Blakney, Robert G [mailto:Robert.G.Blakney@conocophillips.com] Sent: Monday, February 08, 2016 2:53 PM To: Wallace, Chris D (DOA) <chris.wallace@alaska.gov> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL] Hydraulic Fracturing Sundry Application 316-096 CRU C135-09 (PTD 2151770) Chris, Fair question. For cd5-10 & 09, we will change our pre- job tubing pressure test values to 3850 psi. Cd5-11 Mptp should also be 7,000 psi. Sorry that was left off the application. We will pt the tubing to 3,850 psi also. Let me know if you have any other questions. Thanks, -Robbie Sent with Good (www.good.com) From: Wallace, Chris D (DOA) <chris.waIlace @alaska.gov> Sent: Monday, February 08, 2016 5:40:46 PM To: Blakney, Robert G Cc: Loepp, Victoria T (DOA) Subject: [EXTERNAL] Hydraulic Fracturing Sundry Application 316-096 CRU CD5-09 (PTD 2151770) Robert, We are reviewing the A -Sand stimulation sundries CD5-09, CD5-10, and CD5-11. They each make reference to tubing and IA pressure testing to 3500 psi. CD5-09 and CD5-10 reference the maximum treating pressure as 7000 psi and mention the IA backpressure of 3500 psi. The 110% testing requirement of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) do not seem to be met for these pressures? Last weekend Adam (KRU 25-01 (PTD 2152030)) changed the frac program to say the IA popoff would be set at 4000 psi and backpressure of 3800 psi would be held. That resulted in tubing differential of 4240 psi and necessitated a tubing test to 5000 psi to satisfy the 110% testing requirement. CD5-11 doesn't mention or demonstrate a maximum anticipated treating pressure (20 AAC 25.283 (a)(12)(E)) so it is difficult to determine testing requirements of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) ? Thanks and Regards, Chris Wallace Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 (907) 793-1250 (phone) (907) 276-7542 (fax) chris.wallace @alaska.gov<mailto:chris.waIlace @alaska.gov> CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793- 1250 or chris.wallace@alaska.gov<mailto:chris.waIlace @alaska.gov>. Wallace, Chris D (DOA) From: Wallace, Chris D (DOA) Sent: Friday, December 30, 2016 9:49 AM To: hanna.sylte@conocophillips.com Subject: Hydraulic Fracturing Sundry Application 316-645 CRU CD5-99A (PTD 2161220) Hanna, We are reviewing the A -Sand stimulation sundry for CD5-99A. It makes reference to tubing and IA pressure testing to 3500 psi. CD5-99A reference the maximum treating pressure as 7500 psi at 25 bpm and mention the stage IA backpressure of 2500 to 3500 psi. The 110% testing requirement of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) do not seem to be met for these pressures? Please identify the IA popoff pressure and test pressure for 20 AAC 25.283(a)(12) Step 7 of the procedure. Surface rig up diagram states IA parallel PRV set to 3500 psi. Thanks and Regards, Chris Wallace, Sr. Petroleum Engineer, Alaska Oil and Gas Conservation Commission, 333 West 7th Avenue, Anchorage, AK 99501, (907) 793-1250 (phone), (907) 276-7542 (fax), chris.wallace@alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793- 1250 or chris.wallace@alaska.gov. -----Original Message ----- From: Blakney, Robert G [mailto:Robert.G.Blakney@conocophillips.com] Sent: Monday, February 08, 2016 2:53 PM To: Wallace, Chris D (DOA) <chris.wallace@alaska.gov> Cc: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Subject: RE: [EXTERNAL] Hydraulic Fracturing Sundry Application 316-096 CRU CD5-09 (PTD 2151770) Chris, Fair question. For cd5-10 & 09, we will change our pre- job tubing pressure test values to 3850 psi. Cd5-11 Mptp should also be 7,000 psi. Sorry that was left off the application. We will pt the tubing to 3,850 psi also. Let me know if you have any other questions. Thanks, -Robbie Sent with Good (www.good.com) From: Wallace, Chris D (DOA) <chris.waIlace @alaska.gov> Sent: Monday, February 08, 2016 5:40:46 PM To: Blakney, Robert G Cc: Loepp, Victoria T (DOA) Subject: [EXTERNAL] Hydraulic Fracturing Sundry Application 316-096 CRU CD5-09 (PTD 2151770) Robert, We are reviewing the A -Sand stimulation sundries CD5-09, CD5-10, and CD5-11. They each make reference to tubing and IA pressure testing to 3500 psi. CD5-09 and CD5-10 reference the maximum treating pressure as 7000 psi and mention the IA backpressure of 3500 psi. The 110% testing requirement of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) do not seem to be met for these pressures? Last weekend Adam (KRU 25-01 (PTD 2152030)) changed the frac program to say the IA popoff would be set at 4000 psi and backpressure of 3800 psi would be held. That resulted in tubing differential of 4240 psi and necessitated a tubing test to 5000 psi to satisfy the 110% testing requirement. CD5-11 doesn't mention or demonstrate a maximum anticipated treating pressure (20 AAC 25.283 (a)(12)(E)) so it is difficult to determine testing requirements of 20 AAC 25.283(b) and 20 AAC 25.283(c)(2) ? Thanks and Regards, Chris Wallace Sr. Petroleum Engineer Alaska Oil and Gas Conservation Commission 333 West 7th Avenue Anchorage, AK 99501 (907) 793-1250 (phone) (907) 276-7542 (fax) chris.waIlace @alaska.gov<mailto:chris.waIlace@alaska.gov> CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Chris Wallace at 907-793- 1250 or chris.waIlace @alaska.gov<mailto:chris.wa[lace @alaska.gov>. 20 AAC 25.283 Hydraulic Fracturing Application — Checklist Well Name No. CRU CD5-99A (PTD No. 216-122; Sundry No. 316-645) Paragraph Sub -Paragraph Section Complete? (a)(8) Pressure ratings and schematics: IA 6890 psi, tubing 10160 psi, surface piping 10000 psi, tree wellbore, wellhead, BOPS, treating head saver 15000 psi. CDW (a)(9)(A) Fracturing and confining zones: Fracturing zone will be the Alpine A sandstone. It is - 30" lithologic description for each zone thick, true vertical thickness. Upper confining zones are the Miluveach, Kalubik and HRZ shales, 470' thick. The PKB (a)(9)(B) Geological name of each zone lower confining zone consists of approximately 1,800' of Kingak shales. (a)(9)(C) and (a)(9)(D) Measured and true Top Alpine A is at 16,043' MD (7,518' TVDss). vertical depths Top HRZ is at 13,667' MD (6,940' TVDss). PKB Kingak shale not penetrated by CD5-99A. Alpine A est. fracture gradient is 12.5 ppg. (a)(9)(E) Fracture pressure for each zone Miluveach est. fracture gradient is 15 ppg and Kalubik/HRZ PKB fracture gradient is 16 ppg. Kingak est. fracture gradient is 15-18 ppg. (a)(10) Location, orientation, report on mechanical condition of each well provided CDW (a)(11) Sufficient information to determine wells will not interfere with containment Provided CDW within % mile Operator identified three northwest trending faults that transect the Alpine A formation or may enter the confining (a)(11) Faults and fractures, Location, zone within % mile radius of the CD5-99A wellbore orientation trajectory. Faults range in throw from 8 to 17 feet. Any faults that are within the half mile radius of the wellbore (a)(11) Faults and fractures, Sufficient do not extend up through the confining interval and PKB information to determine no interference fracture gradients within the top seal intervals would not with containment within % mile be exceeded during fracture stimulation and would therefore confine injected fluids to the pool. Principal stress direction in the Alpine A formation, along with the well path, is northwest -southeast. All of the AOGCC Page 2 January 13, 2017 20 AAC 25.283 Hydraulic Fracturing Application — Checklist Well Name No. CRU CDS-99A (PTD No. 216-122; Sundry No. 316-645) Paragraph (b)Testing of casing or intermediate casing (c) Fracturing string Sub -Paragraph �. Section Complete?� fractures will be longitudinal, running parallel to the wellbore. Because of this, the fractures will only intersect faults that intersect the wellbore. Mitigation: If there are indications that a fracture has intersected a fault during fracturing operations, the operator would flush and terminate the stage immediately. - (a)(12) Proposed program for fracturing Provided operation (a)(12)(A) Estimated volume 681K Ib prop, 8425 bbl clean vol, detailed (a)(12)(B) Additives: names, purposes, detailed concentrations (a)(12)(C) Chemical name and CAS number Confidential chemical CAS provided or previously provided of each and on file with AOGCC. (a)(12)(D) Inert substances, weight or detailed volume of each (a)(12)(E) Maximum treating pressure with supporting info to determine Max 7500 psi, 25 bpm. appropriateness for program (a)(12)(F) Fractures - height, length, MD and TVD to top, description of fracturing model (a)(13) Proposed program for Post - fracturing well cleanup and fluid recovery Table provided. 8 stages Class I disposal well plan Tested >11010 of max anticipated pressure Previously tested to 3500 psi. Plan to retest to 3850 psi casing prior to frac. (c)(1) Packer >100' below TOC of production or intermediate casing _ (c)(2) Tested >110% of max anticipated Outlined in provided table CDW CDW CDW CDW CDW - CDW CDW CDW VTL Plan to test surface to 9000 psi. Plan to test tubing to 4600 CDW AOGCC Page 3 January 13, 2017 20 AAC 25.283 Hydraulic Fracturing Application — Checklist Well Name No. CRU CD5-99A (PTD No. 216-122; Sundry No. 316-645) Paragraph Sub -Paragraph pressure differential (d) Pressure relief Line pressure <= test pressure, remotely valve controlled shut-in device (e) Confinement Frac fluids confined to approved _ formations (f) Surface casing Monitored with gauge and pressure relief pressures device (g) Annulus pressure monitoring & 500 psi criteria Section psi. Maximum differential pressure is 4000 psi (7500 psi string with 2500 to 3500 IA backpressure). Or max diff press. Is 7125 psi — 3500 psi = 3625 psi 6925 psi pump trip, PRV set 95% max treating pressure 7125, IA PRV set at 3600 psi. Max treating pressure estimated 6000 psi. Complete? AT -97A CDW CDW AOGCC Page 4 January 13, 2017 (g)(1) Notify AOGCC within 24 hours (g)(2) Corrective action or surveillance (g)(3) Sundry to AOGCC (h) Sundry Report (i) Reporting 0)(1) FracFocus Reporting (i)(2) AOGCC Reporting: printed & electronic (j) Post frac water sampling plan (k) Confidential Clearly marked and specific facts information supporting nondisclosure (I) Variances Modifications of deadlines, requests for requested variances or waivers Section psi. Maximum differential pressure is 4000 psi (7500 psi string with 2500 to 3500 IA backpressure). Or max diff press. Is 7125 psi — 3500 psi = 3625 psi 6925 psi pump trip, PRV set 95% max treating pressure 7125, IA PRV set at 3600 psi. Max treating pressure estimated 6000 psi. Complete? AT -97A CDW CDW AOGCC Page 4 January 13, 2017 20 AAC 25.283 Hydraulic Fracturing Application — Checklist Well Name No. CRU CD5-99A (PTD No. 216-122; Sundry No. 316-645) Paragraph Sub -Paragraph Section Complete? AOGCC Page 5 January 13, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED JAN 0 5 2017 L,1, WELL COMPLETION OR RECOMPLETION REPORT AGOG 1a. Well Status: Oil 0 � Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions: 1b. Well Class: Development Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Aband.: 11/30/2016 14. Permit to Drill Number / Sundry: 216-122/ , 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 10/1/2016 15. API Number: 50-103-20748-01-00 4a. Location of Well (Governmental Section): Surface: 287' FNL, 2421' FEL, Sec 18, T11 N R4E, UM Top of Productive Interval: 1718' FNL, 1787' FEL, Sec 21, T11N, R4E, UM Total Depth: 767' FNL, 1648' FEL, Sec 34 T11 N, R040� UM 8. Date TD Reached: 10//27/2016 16. Well Name and Number: CRU CD5-99A ` 9. Ref Elevations: KB:70.4 GL:33.9 BF: 17. Field / Pool(s): Colville Rive Unit/Alpine Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ASRC-NPR2, ASRC-NPR4, ADL 387208, ADL 387209 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 349559 y- 5965921 Zone -4 TPI: x- 360641 y- 5958995 Zone -4 Total Depth: x- 365903 y- 5949289 Zone -4 11. Total Depth MD/TVD: 27128/7716 • 19. Land Use Permit: 932128, 932669, 932193, 932195 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: 1340/1325 5. Directional or Inclination Survey: Yes Q (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window IMD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) I -Y/FC 2346 r 22Z (o 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed Fogs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of Fogs to be listed include, but are not limited to: mud Fog, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH NHOLE SIZE CEMENTING RECORD D AMOUNT CASING FT TOP BOTTOM TOP BOTTOM PULLED 20 78.6 H-40 36 115 36 115 42 10 yds 103/4 45.5 L-80 36 2337 36 2183 131/2 354 bbls 11.0 ppg, 56.3 bbls 15.8 ppg G 75/8 29.7 L-80 34 15571 36 7564 9 7/8 x 11 168 bbls 15.8 Class G 412 12.6 L-80 15226 27071 7109 7715 63/4 Liner 24. Open to production or injection? Yes R] No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): Liner @ 15226 - 27071 MD and 7109 - 7715 TVD �l36`l4 LL 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3 1/2 15252 15226 MD/7516 TVD 14512 MD/7357 TVD 14586 MD/7382 TVD 15197 MD/7571 TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑ Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 12/6/2016 Method of Operation (Flowing, gas lift, etc.): GAS LIFT Date of Test: 12/6/2016 Hours Tested: 130 hrs Production for Test Period Oil -Bbl: 14,246 Gas -MCF: 9,164 Water -Bbl: 513 Choke Size: 64/64th Gas -Oil Ratio: 477 Flow Tubing Press. 578 psi Casing Press: 1575 psi Calculated 24 -Hour Rate Oil -Bbl: 2,629 Gas -MCF: 1,691 Water -Bbl: 95 Oil Gravitv - API (corr): 39.3 Form 10-40 e d 1j/ 15 CONTINUED ON PAGE 2L J - ,y , -^ •-Submit ORIGINIAL orw RBUYI UAi�� i LU l% C i� 28. CORE DATA Conventional Core(s): Yes ❑ No 0 Sidewall Cores: Yes ❑ No 0 If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1340 1325 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 16043 7588 information, including reports, per 20 AAC 25.071. C30 2533 2332 K3 5857 3796 K2 6458 4042 Albuan 97 8524 4899 Albian 96 10983 5906 H RZ 13667 7011 Kalubik 14090 7187 Kuparuk C 14354 7297 LCU/Miluveach 14367 7302 Alpine C 15032 7482 Alpine A 16043 7588 TD 27128 7716 Formation at total depth: Alpine A 31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontolooical report, roduction or well test results, er 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: David Lee a) 263-3741 Email: David. L. Lee co .com Printed Name: G.L. Alvord Title: Alaska Drilkling Manager �1 Signature: !a'+� Phone: 265-6120 Date: INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only WNS PROD CD5-99 Cclnoc8lF li��1�15, — t Well Aftribut Max Angle ) TD Alaska, Inc Wellbore API/UWI Field Name Wellbore Sfatus w" MD (ftKB) Act Btm (ftKB) 501032074800 ALPINE PROD 82.83 16,467.21 17,04 Last WO: 1 1 36.551 11/30/2016 ernca - me.. est„ Annotation Depth (ftKB) End Date Annotation Last Mod By End Date Last Tag: Rev Reason: NEW WELL pproven 11/30/2016 Cement Squeezes ....... ... ......... ................. ............ ................ TOP(TVD) Btin(TVD) Top (ftKB) Btm (ftKB) (ftKB) (ftKB) Des Start Date Co. 14,800.0 15,410.0 6,953.9 7,176.1 Cement Plug 9/19/2016 10,800.0 11,403.0 5,465.2 5,690.3 Cement Plug 9/20/2016 6,607.0 7,327.0 3,906.5 4,174.5 Cement Plug 9/27/2016 2,677.0 2,739.0 2,405.2 2,440.2 Cement Plug 9/28/2016 HANGER; 311 „ 12,139.0 2,677.0 2,029.5 2,405.2 Cement Plug 9/30/2016 ( Notes: General & Safety End Date Annotation ......._......._...._..._......._.......... _.............. '. ....- NOTE: CONDUCTOR; 36.5115.0 SURFACE -36.02337.1 INTERMEDIATE, 34.1 -15,5706 Cement Plug; 2,139 0 ftKB Cement Plug; 2,677.0 We Cement Plug', 6,607.0 ftKB Cement Plug; 10,800.0 ftKB Cement Plug, 14,800.0 ftKB WNS PROD CD5-99AL1 Co11OC OM1111pS Well Attribut, Max Angle J TD � , Inc Wellbore APBUWI 1501032074861 Field Name ALPINE Wellbore Status ncl(') PROD 94.38 MD(ftKB) 15,649.60 Act Btm(ftKB) 16,821.0 Comment H2S (ppm) I Data Annotation I End Date KB-Grd (ft) 36.55 Rig Release Date 11/30/2016 CDS99AL1, 1/42017 2:04:06 PM maac.... ............................................................................................ Annotation Depth (ftKB) Entl Date Annotation Last Motl By I End Date HANGER; 31.1 ............. asing Hogs Casing Description OD (in) ID (in) Top(ftKB) Set Depth (ftKB) Set Depth (TVD)... WtlLen(I... Grade Top Thread Window Lt 67/8 15,121.0 15,134.0 7,500.5 • • •• • - - •......• -- ,• .. - Casing Description DD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... Wt/Len (I... Grade Top Thread Open Hole 63/4 6.750 15,121.0 16,821.0 Casing Description OD (in) ID (In) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... Wt/Len (1... Grade Top Thread ECP Packer Assembly 41/2 3.950 15,500.1 15,797.0 7,518.8 12.60 L-80 11BTM CONDUCTOR; 36.6-115.0 NIPPLE; 2,134.7 SURFACE; 36.0-2,337.1 Metal SWn Patch 7-5/8"; 2,270.9. 2,4580 GAS LIFT; 4,909.2 GAS LIFT; 10,247.8 XO Threads; 10,265.2 GAS LIFT; 14,378.8 GAUGE; 14,437 .1 LOCATOR, 14,458.9 SEAL ASSY; 14,459.9 PBR; 14,465.9 PACKER; 14,511.6 NIPPLE; 14,538.3 SEAL ASSY; 14,556 2 Tubing -Pup; 14,558.0 MULE SHOE; 14,562.8 PACKER; 14,585.7 NIPPLE; 14,601.7 INTERMEDIATE; 34.1-15,5706 Winda4• L1; 15,121.0-15,134.0 ECP Packer Assembly; 15,500.1 -15,797.0 Open Hole; 15,121.0-16,821.0 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 8/27/2016 8/27/2016 3.00 MIRU MOVE RURD P Prep floor for skid, blow down lines. 0.0 0.0 00:00 03:00 Disconnect electric and service lines. 8/27/2016 8/27/2016 4.50 MIRU MOVE MOB P Move pits and motors 15" away from 0.0 0.0 03:00 07:30 sub. Skid rig floor into the moving position. Stage rig to move mats around. Turn tires to crab rig and set transition mats. 8/27/2016 8/27/2016 2.50 MIRU MOVE MOB P Crab rig down pad, turn tires. Spot sub 0.0 0.0 07:30 10:00 over well CD5-99. 8/27/2016 8/27/2016 2.00 MIRU MOVE MOB P Lower stomper and preload with 500 0.0 0.0 10:00 12:00 psi. Lower wind wall. Walk pits/ motors down to sub. Skid rig floor into drilling position. Finish spotting pits / motors to sub. 8/27/2016 8/27/2016 2.00 MIRU MOVE RURD P Hook up service lines (Air, Steam, 0.0 0.0 12:00 14:00 Water, Mud lines, Fuel) Work on rig acceptance checklist. Pipe shed spotted, electrician hook up power cables to sub, top drive power cables. Rig accept @ 14:00 hrs. 8/27/2016 8/27/2016 3.00 MIRU MOVE RURD P R/U riser, flow line, riser clamp, turn 0.0 0.0 14:00 17:00 buckles, hole fill and bleed off hose on riser. Electrician test gas alarms. 4" ball valves on conductor. Swap to Hiline power @ 14:45 hrs. GIS on Hiline @ 16:00 hrs. 8/27/2016 8/27/2016 0.50 MIRU MOVE SFTY P Pre -Spud meeting with drilling crew, 0.0 0.0 17:00 17:30 CPAI, Tool Pusher, DD/MWD, Mud Eng. 8/27/2016 8/27/2016 3.00 MIRU MOVE RURD P Function annular (OK). P/U BHA tools 0.0 0.0 17:30 20:30 to rig floor from beaver slide. Flush water through muline. Pressure test mudline to 5000 psi for 10 minutes. No leaks. 8/27/2016 8/27/2016 2.50 MIRU MOVE BHAH P PJSM, P/U BHA to 95' as per SLB 0.0 115.0 20:30 23:00 DD/MWD. Continue to M/U BHA and stand back in derick w/ 1 stand DC due to issues in pit room. 8/27/2016 8/28/2016 1.00 MIRU MOVE RGRP T Encountered problems in shaker 115.0 115.0 23:00 00:00 installation. Test ran spud mud over shakers @ -300 gpm and disvovered mud won't preferentially travel down the trough. Mud underflow flows over the weirs under the shaker (Tray) both front and back, then into drag chain via under shakers. Superinendant, Tour pusher and welders begin alterations via adding jet lines and widening the trough where possible. SIMOPS- R/U Gyro sheave in derrick. P/U 5" HWDP and rack back in derrick. Page 1/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) � w , CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 8/28/2016 8/28/2016 8.00 MIRU MOVE RGRP T Continue to modify shaker trough to 115.0 115.0 00:00 08:00 accomodate flow rates needed for surface. Increased flow area leaving shakers to the trough and added gun lines to help jet mud. Tested shakers after modifications with 800gpm flow rate. SIMOPS- P/U 5" HWDP and 5" DP for surface hole. Load shed with 5" DP, number and strap same. Load shed with 10-3/4" casing, 8/28/2016 8/28/2016 1.25 MIRU MOVE BHAH T UBHO was observed leaking out the 115.0 115.0 08:00 09:15 set screw hole while testing new shaker system. Break off and lay down leaking UBHO, carry scribe line up from MWD, install new UBHO, orientate lug key way on UBHO with MWD scribe line. Run in locking screws, confirm Gyro will orientate. Make up stand and pump down to confirm no leaks. 8/28/2016 8/28/2016 0.25 MIRU MOVE WASH P Wash conductor down to 115' MD, 115.0 115.0 09:15 09:30 475 gpm 550 psi. 8/28/2016 8/28/2016 2.50 SURFAC DRILL DDRL P Drill from 115' MD to 371' MD. 115.0 371.0 09:30 12:00 ART=2.15 hrs, AST=O hrs. ADT=2.15 hrs. P/U=75k, S/O=75k, ROT=75k. 450 gpm, 640 psi, 50 rpm, 1k TQ. Experimenting with different scalper screen sizes, jetting configuratons to optimize shaker performance. 8/28/2016 8/29/2016 12.00 SURFAC DRILL DDRL P Directional drill from 371' MD to 1,582' 371.0 1,582.0 12:00 00:00 MD, 1,554' TVD. ADT=6.49, AST=3.29, ART=3.20. P/U=115k, S/O=110k, ROT= 114k, TQ on/off=4.1/1.7k. 450-580 gpm, 1800 psi. Change shaker screens on all three levels to handle flow. Poked holes in scalpers to minimize blinding after attempting API 10, 20 and 30 screens (once in clay). Screen lower decks down to API 120. Also working drag chain isses due sticky clay packing in trough. 8/29/2016 8/29/2016 2.00 SURFAC DRILL RGRP T Due to heavy buildup of sticky clay in 1,582.0 1,582.0 00:00 02:00 bottom of drag chain trough, had to change out to a harder paddle to scrape trough. After changing paddle, had to clean out the drag chain trough of clay by scraping / chipping so harder paddle would pass. In the proccess, the drag chain switch broke, electrician repaired while floorhands cleaned out the trough. Page 2/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) r CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 8/29/2016 8/29/2016 9.50 SURFAC DRILL DDRL P Directional drill from 1,582' MD to 1,582.0 2,347.0 02:00 11:30 2,347' MD, 2,189' TVD. ADT=6.56, AST=2.51, ART=4.05. P/U=125k, Jar Hrs=13.05. S/0=120k, ROT=120k, TQ on/off=6k/4k. 580-800 gpm, 2600 psi. Weight up mud system to 9.6 ppg @ 1,900' MD, then 10.0 ppg by TD. 8/29/2016 8/29/2016 0.50 SURFAC CASING CIRC P Pump survey on bottom, pump 2,347.0 2,246.0 11:30 12:00 weighted sweep with Nut Plug M. CBU 358 bbl, lay down single and rack back 1 stand. 8/29/2016 8/29/2016 2.25 SURFAC CASING CIRC P CBU X 4, racking back stand after 2,246.0 1,772.0 12:00 14:15 each BU from 2,246' MD to 1,772' MD at full rates 800 gpm, 2360 psi, 60 rpm, 3k Tq. 8/29/2016 8/29/2016 0.25 SURFAC CASING OWFF P Flow check well for 15 minutes, static. 1,772.0 1,772.0 14:15 14:30 8/29/2016 8/29/2016 0.75 SURFAC CASING TRIP P POOH on elevators from 1,772' MD to 1,772.0 1,488.0 14:30 15:15 1,488' MD. Pulling over 25k @ 1,609', 1,602', 1,519', 1,488'. Decide to pump out. 8/29/2016 8/29/2016 0.75 SURFAC CASING PMPO P Pump out of hole from 1,488' MD to 1,488.0 1,300.0 15:15 16:00 1,300' MD @ 550 gpm, 1260 psi, no rotary. 8/29/2016 8/29/2016 2.00 SURFAC CASING TRIP P POOH on elevators from 1,300' MD to 1,300.0 84.0 16:00 18:00 84' MD. Observed tight spot @ 312' MD, 25k overpull. Worked it twice, third time pulled trough no more overpull. 8/29/2016 8/29/2016 2.00 SURFAC CASING BHAH P PJSM, lay down BHA per SLB 84.0 0.0 18:00 20:00 DD/MWD reps. Clean and clear rig floor. 8/29/2016 8/29/2016 1.50 SURFAC CASING RURD P P/U and R/U Volant CRT, bail 0.0 0.0 20:00 21:30 extensions, hand slips, bowl inserts, 10%" elevators and casing equipment, 350T slips, 10%" Hanger. 8/29/2016 8/29/2016 0.25 SURFAC CASING SFTY P PJSM on running 10%" casing with 0.0 0.0 21:30 21:45 DDI, CPA[, Doyon casing. 8/29/2016 8/30/2016 2.25 SURFAC CASING PUTB P Pick up shoe, shoe track, Float collar 0.0 481.0 21:45 00:00 and XO jt. Flow test through floats and check floats OK. Continue P/U 10%" Hydril 45.5# 563 casing to 481' MD 8/30/2016 8/30/2016 3.75 SURFAC CASING PUTB P Continue running 10%" 45.5# L-80 481.0 1,489.0 00:00 03:45 Hydril 563 casing from 481' MD to 1,489' MD (Jt 35). Took weight to block weight @ 880' MD, repeated attempts to pass past 900' very slow. Establish circulation @ 2 bpm, increased to 3 bpm and washed down joint #21. 8/30/2016 8/30/2016 0.75 SURFAC CASING CIRC P CBU (110 bbl) @ 1,489' MD, stage 1,489.0 1,489.0 03:45 04:30 pumps up from 3 bpm to 5 bpm. 8/30/2016 8/30/2016 2.75 SURFAC CASING PUTB P Continue running 10%" 45.5# L-80 1,489.0 2,299.0 04:30 07:15 Hydril 563 casing from 1,489' to 2,299' 8/30/2016 8/30/2016 0.50 SURFAC CASING HOSO P M/U hanger & landing joint. Land 2,299.0 2,337.0 07:15 07:45 casing on hanger @ 2,337'. PU wt 142 k, SO wt 131 k Page 3173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) 3. CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 8/30/2016 8/30/2016 2.00 SURFAC CEMENT CIRC T Attempt to establish circulation. 2,337.0 2,337.0 07:45 09:45 Pumping 1 - 3 bpm @ 480 psi on the up stroke & pumps off on the down stroke. No returns on the down stroke. Cont to reciprocate pipe & circ out thick heavy mud for a total of 200 bbls pumped before full returns were established. 8/30/2016 8/30/2016 2.50 SURFAC CEMENT CIRC P Circ & cond mud for cement job. 2,337.0 2,337.0 09:45 12:15 Stage pumps f/3 to 8 bpm. ICP 480 psi & FCP 150 psi. PU wt 142 k, SO wt 131 k 8/30/2016 8/30/2016 0.25 SURFAC CEMENT RURD P B/D top drive & R/U cementing lines. 2,337.0 2,337.0 12:15 12:30 8/30/2016 8/30/2016 0.50 SURFAC CEMENT CIRC P Break circ thru cemtnlines w/8 bpm @ 2,337.0 2,337.0 12:30 13:00 420 psi. PJSM on cementing. 8/30/2016 8/30/2016 3.00 SURFAC CEMENT CMNT P Dowell PT lines to 3500 psi, Dowell 2,337.0 2,337.0 13:00 16:00 pump 75 bbls 10.5 ppg Mud Push II w/5 bpm @ 165 psi, Drop btm plug, Dowell pump 288 bbls 11.0 ppg (846 sks - 1.91 yld LiteCrete) lead cement w/5 bpm @ 300 psi, Dowell pump 50 bbls 15.8 ppg (240 sks - 1.17 yld Class G) 15.8 ppg tail cement w/5 bpm @ 350 psi, Drop top plug, Dowell pump 20 bbls water, 5 bpm, 350 psi, Rig chase with 197 bbls 10.0 ppg DrilPlex mud w/8 bpm @ 800 psi, slow to 3 bpm @ 450 psi last 10 bbls, and bump on schedule with 1952 stks @ 96% eff. Pressure up to 950 psi & hold for 5 min. Check floats (good) CIP @ 15:52 hrs. Reciprocate pipe w/full returns. 165 bbls good cement to surface. 8/30/2016 8/30/2016 0.25 SURFAC CEMENT OWFF P OWFF static, Function 20" annular 3 x 0.0 0.0 16:00 16:15 (Flush with 35 bbl treated water) Leave annular closed & monitor psi. 8/30/2016 8/30/2016 1.75 SURFAC CEMENT RURD P Rig down cementing equipment, clean 0.0 0.0 16:15 18:00 and clear rig floor. Break off 10' pup from 2 piece landing joint. 8/30/2016 8/30/2016 4.00 SURFAC CEMENT WOC P Mechanic inspect & service IBOP. 0.0 0.0 18:00 22:00 Install new sensor for MWD on stand pipe. Test stand pipe to 5000 psi. Test IBOP to 3500 psi. Check pre-charge on hydraulic accumulator on top drive. SIMOPS - W.O.C. & clean pits. 8/30/2016 8/31/2016 2.00 SURFAC CEMENT WOC P M/U BHA #2 as per SLB & rack back 0.0 0.0 22:00 00:00 in derrick. SIMOPS - W.O.C. & clean pits. 8/31/2016 8/31/2016 2.00 SURFAC CEMENT WOC P M/U BHA #2 as per SLB & rack back 0.0 0.0 00:00 02:00 in derrick. SIMOPS - W.O.C. & clean pits. 8/31/2016 8/31/2016 4.00 SURFAC CEMENT WOC P Pick up 27 stands 5" DP & rack back 0.0 0.0 02:00 06:00 in derrick. SIMOPS - W.O.C. & clean pits. 8/31/2016 8/31/2016 1.00 SURFAC CEMENT RURD P M/U 10 3/4" pup jt to landing joint. 0.0 0.0 06:00 07:00 Back out & L/D landing joint. Page 4/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) M CD5-99 { f •'' Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 8/31/2016 8/31/2016 1.00 SURFAC CEMENT WWWH P Flush stack from rig floor with water 0.0 0.0 07:00 08:00 hose. Mud caked on. M/U stack washer, fill pill pit with H2O. Wash stack. B/D top drive & L/D stack washer. 8/31/2016 8/31/2016 2.50 SURFAC CEMENT NUND P N/D surface riser, flowline, drains, 0.0 0.0 08:00 10:30 holefill lines. N/D 20" surface annular and adapter. Remove from cellar. 8/31/2016 8/31/2016 1.00 SURFAC WHDBOP NUND P N/U FMC Alpine Gen II wellhead and 0.0 0.0 10:30 11:30 test to 1000 psi ten minutes witness CPAI. 8/31/2016 8/31/2016 3.50 SURFAC WHDBOP NUND P N/U BOPE to well head. Connect 0.0 0.0 11:30 15:00 kill/choke & koomy lines. 8/31/2016 8/31/2016 5.50 SURFAC WHDBOP MPDA P N/U MPD & 1502 equipment, Orbit 0.0 0.0 15:00 20:30 valve, Katch Kan, drain/return lines, flobox/line, clamp, cement line, set MPD test plug. Test MPD equipment to 250/1200 psi for 5 minutes each. Pull MPD test cap and install trip nipple. Send trip nipple to shop for modifications. 8/31/2016 8/31/2016 1.25 SURFAC WHDBOP RURD P Function blind rams. Set 5" test joint & 0.0 0.0 20:30 21:45 function pipe rams. R/U to test BOPE. Fill stack w/1-120 8/31/2016 9/1/2016 2.25 SURFAC WHDBOP BOPE P Test BOPE w/5" test joint. Annular, 0.0 0.0 21:45 00:00 HCR choke/kill 250/2500 psi for 5 min. Upper 3 1/2" X 6" VBR's, choke valves 1,12,13,14, auto IBOP, 4" Demco, choke valves 9,11, man IBOP, HCR kill, needle valve, dart valve & choke valves 5,8,10 to 250/3500 psi for 5 min. Test witness waived by Guy Cook of the AOGCC 9/1/2016 9/1/2016 4.00 SURFAC WHDBOP BOPE P Continue test BOPE w/5" test joint. 0.0 0.0 00:00 04:00 Test choke valves #2 - 7, HCR Choke and Kill, man choke/kill, 3 1/2" X 6" lower VBR's, & blind rams to 250/3500 psi for 5 min. Koomey test; IP= 3,000 psi, press after close = 1,525 psi, 200 psi recovery 32 sec, full recovery 137 sec, N2- 4 bottle average= 2250 psi. Tested gas alarms. Draw down on man & super choke to 1,100 psi. - Test waived by Guy Cook of the AOGCC. 9/1/2016 9/1/2016 1.00 SURFAC WHDBOP RURD P Circulate through Poor Boy Degasser 0.0 0.0 04:00 05:00 staging up from 1 by to 8 bpm 9/1/2016 9/1/2016 1.00 SURFAC WHDBOP RURD P Drain stack, pull test plug and install 0.0 0.0 05:00 06:00 wear ring (10-7/8" O.D. x 10" I.D. x 4.33' L) 9/1/2016 9/1/2016 1.25 SURFAC CEMENT BHAH P Make up BHA # 2 per directional driller 0.0 823.0 06:00 07:15 to 823' 9/1/2016 9/1/2016 1.00 SURFAC CEMENT TRIP P Trip in hole from 823' to 2,048' 823.0 2,048.0 07:15 08:15 9/1/2016 9/1/2016 1.00 SURFAC CEMENT CIRC P Circulate and condition mud prior to 2,048.0 2,048.0 08:15 09:15 casing test w/600 gpm @ 1400 psi. P/U wt 127 k, S/O wt113 k, ROT wt 120 k, 50 rpm 9/1/2016 9/1/2016 1.25 SURFAC CEMENT PRTS Rig up and test casing to 3500 psi for 2,048.0 2,048.0 09:15 10:30 IP 30 min. Record test on chart. Page 5/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/1/2016 9/1/2016 0.50 SURFAC CEMENT RURD P Blow down test lines and R/D testing 2,048.0 2,048.0 10:30 11:00 equipment 9/1/2016 9/1/2016 2.50 SURFAC CEMENT MPDA P Pull trip nipple & install MPD bearing. 2,048.0 1,960.0 11:00 13:30 Test MPD system, Practice Ramp Up/ Ramp Down with pumps simulating constant BHP. B/D top drive & MPD choke. Pull MPD bearing & install trip nipple. 9/1/2016 9/1/2016 0.75 SURFAC CEMENT TRIP P Trip in hole from 1,960 to 2,182'. Tag 1,960.0 2,182.0 13:30 14:15 top of cement. 9/1/2016 9/1/2016 1.00 SURFAC CEMENT COCF P W&R from 2,182'to 2,249' w/500 gpm 2,182.0 2,249.0 14:15 15:15 @ 1170 psi, 30 rpm @ 3.8 k trq. Tag float collar on depth. 9/1/2016 9/1/2016 3.50 SURFAC CEMENT DRLG P Drill shoe track & rat hole f/2,249' to 2,249.0 2,347.0 15:15 18:45 2,347'w/630 gpm @ 1470 psi, 30 - 50 rpm, 3.5 - 4.5 k trq. 9/1/2016 9/1/2016 0.25 SURFAC CEMENT DDRL P Drill 20' new formation from 2,347'to 2,347.0 2,367.0 18:45 19:00 2,367' MD / 2,204' TVD, ADT .28 hrs. Displace to 9.6 ppg LSND on the fly 9/1/2016 9/1/2016 0.25 SURFAC CEMENT DISP P Displace to 9.6 ppg LSND. BROOH 2,367.0 2,328.0 19:00 19:15 from 2,367' to 2,328' 9/1/2016 9/1/2016 1.00 SURFAC CEMENT FIT P R/U testing equipment. FIT to 18.0 2,328.0 2,328.0 19:15 20:15 ppg (955 psi). R/D testing equipment. 9/1/2016 9/1/2016 0.25 INTRM1 DRILL REAM P W&R from 2,328' to 2,367'w/600 gpm 2,328.0 2,367.0 20:15 20:30 @ 1300 psi, 60 rpm, 3.5 k trq 9/1/2016 9/1/2016 0.50 INTRM1 DRILL DDRL P Drill ahead f/2,367' to 2,423' MD, 2,367.0 2,423.0 20:30 21:00 ADT .49 hrs, ECD 10.05 ppg, 600 gpm, 1300 psi, PU wt 130 k, SO wt 118 k, ROT wt 124 k, 60 rpm, Trq 4.6/2.2 k ft lbs, 5/10 wob (Shakers not able to handle solids load, decision made to POOH to shoe) 9/1/2016 9/1/2016 0.25 INTRM1 DRILL BKRM T BROOH to shoe f/2,423 to 2,328' (No 2,423.0 2,328.0 21:00 21:15 rotation across shoe) 9/1/2016 9/1/2016 1.00 INTRM1 DRILL RGRP T New shakers not able to handle 2,328.0 2,328.0 21:15 22:15 cuttings load with scalper & shaker screen configuration. Trouble shoot shaker screens. Try various flow rates 9/1/2016 9/1/2016 0.75 INTRM1 DRILL CIRC T Stage up flow rates to 600 gpm, stage 2,328.0 2,423.0 22:15 23:00 up flow rates to 795 gpm. Wash in hole to 2,423'. Shakers appear to be handling flow. Decision made to drill ahead. 9/1/2016 9/2/2016 1.00 INTRM1 DRILL DDRL P Drill ahead f/2,423' to 2,428' MD / 2,423.0 2,428.0 23:00 00:00 2,248' TVD, ADT .57 hrs, ECD 10.10 ppg, 795 gpm, 2190 psi, PU wt 130 k, SO wt 118 k, ROT wt 124 k, 60 rpm, Trq 4.6/2.2 k ft lbs, 5/10 wob 9/2/2016 9/2/2016 0.50 INTRM1 DRILL DDRL P Drill (/2428 to 2464' 2,428.0 2,464.0 00:00 00:30 Page 6173 Report Printed: 12/1/2016 �E- Y- Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 9/2/2016 9/2/2016 0.50 INTRM1 DRILL CIRC P Activate under ream. Drop 1.25" 2,464.0 2,464.0 00:30 01:00 Torlon ball. Pum down to 250 gpm, @ 250 psi for 3 minutes and then 150 gpm @ 130 psi for 3 minutes. Seat ball and shear out with 1645 psi. Stage flow rate to 800 gpm and observe pressure decrease from 2200 psi to 1650. TRPM decreased from 3398 rpm to 2812 rpm indicating under reamer is open. Ream down 5'. Pull test on shoe to 10 kips. Slack off 3' and ream to bottom. Reamer open at 2354' 9/2/2016 9/2/2016 3.50 INTRM1 DRILL DDRL P Drill from 2464'to 2804'@ 600 gpm, 2,464.0 2,804.0 01:00 04:30 1040 psi, 80 rpm, Rotary torque = 4k ft -lbs. Shakers having difficulty with clay 9/2/2016 9/2/2016 1.25 INTRM1 DRILL BKRM T Backream out of the hole from 2804' 2,804.0 2,450.0 04:30 05:45 to 2450' pumping @ 600 gpm @ 1000 psi 80 rpm 9/2/2016 9/2/2016 0.25 INTRM1 DRILL CIRC T Circulate bottoms up at 2518' keeping 2,450.0 2,450.0 05:45 06:00 underreamer below the shoe. Circulate at 594 gpm, 1030 psi, 80 rpm 9/2/2016 9/2/2016 0.25 INTRM1 DRILL TRIP T Pull into the show from 2450' to 2337' 2,450.0 2,337.0 06:00 06:15 9/2/2016 9/2/2016 1.25 INTRM1 DRILL RGRP T Moniitor well while modifying shale 2,337.0 2,337.0 06:15 07:30 shakers 9/2/2016 9/2/2016 1.00 INTRM1 DRILL TRIP T RIH from 2337' to 2706'. Fill pipe and 2,337.0 2,804.0 07:30 08:30 wash to 2804' 9/2/2016 9/2/2016 3.50 INTRM1 DRILL DDRL P Drill ahead f/2,804' to 3,273' MD / 2,804.0 3,273.0 08:30 12:00 2,673' TVD, ADT 4.57 hrs, ECD 10.79 ppg, 790 gpm, 1930 psi, PU wt 135 k, SO wt 115 k, ROT wt 125 k, 180 rpm, Trq 7/5 k ft lbs, 5/10 wob 9/2/2016 9/3/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/3,273' to 5,190 MD / 3,273.0 5,190.0 12:00 00:00 3,376' TVD, ADT 8.4 hrs, ECD 11.49 ppg, 795 gpm, 2670 psi, PU wt 144 k, SO wt 115 k, ROT wt 124 k, 180 rpm, Trq 8.5/3.5 k ft lbs, 10/20 wob 9/3/2016 9/3/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/5,190' to 6,856' MD / 5,190.0 6,856.0 00:00 12:00 3,995' TVD, ADT 8.57 hrs, ECD 11.52 ppg, 798 gpm, 3000 psi, PU wt 170 k, SO wt 127 k, ROT wt 135 k, 180 rpm, Trq 17/12 k ft lbs, 20/25 wob. Pumping nut plug sweeps everyother stand 9/3/2016 9/4/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/6,856' to 8,831' MD / 6,856.0 8,831.0 12:00 00:00 4,730' TVD, ADT 7.72 hrs, ECD 11.35 ppg, 795 gpm, 2710 psi, PU wt 180 k, SO wt 135 k, ROT wt 150 k, 180 rpm, Trq 16/7.5 k ft lbs, 22/30 wob. Pumping nut plug sweeps everyother stand 9/4/2016 9/4/2016 2.00 INTRM1 DRILL DDRL P Drill ahead f/8,831' to 9,205' 8,831.0 9,205.0 00:00 02:00 9/4/2016 9/4/2016 0.75 INTRM1 DRILL RGRP T Circulate w/400 gpm @ 950 psi & 9,205.0 9,205.0 02:00 02:45 attempt to get shaker screens positioned properly on shaker deck. Rubber seal in back of shaker fell off & took some down time to put back into position. Page 7/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/4/2016 9/4/2016 9.25 INTRM1 DRILL DDRL P Drill ahead f/9,205" to 10,710' MD / 9,205.0 10,710.0 02:45 12:00 5,423' TVD, ADT 8.23 hrs, ECD 11.16 ppg, 795 gpm, 2690 psi, PU wt 210 k, SO wt 140 k, ROT wt 170 k, 180 rpm, Trq 19/10 k ft lbs, 25/30 wob. 9/4/2016 9/4/2016 6.50 INTRM1 DRILL DDRL P Drill ahead f/10,710'to 11,745' MD/ 10,710.0 11,745.0 12:00 18:30 TVD 5,809', ECD 11.2 ppg, 795 gpm, 2750 psi, PU wt 220 k, SO wt 138 k, ROT wt 172 k, 180 rpm, Trq 20/11 k ft lbs, 25/30 wob. 9/4/2016 9/4/2016 1.00 INTRM1 DRILL RGRP T Circulate w/350 gpm @ 850 psi. 11,745.0 11,745.0 18:30 19:30 Adjust weir plate on shaker #2 to allow more flow across shaker deck. 9/4/2016 9/5/2016 4.50 INTRM1 DRILL DDRL P Drill ahead f/11,745' to 12,500' MD / 11,745.0 12,500.0 19:30 00:00 6,089' TVD, ADT 7.5 hrs, ECD 11.26 ppg, 795 gpm, 2780 psi, PU wt 235 k, SO wt 146 k, ROT wt 183 k, 180 rpm, Trq 19/10 k ft lbs, 30/35 wob. 9/5/2016 9/5/2016 0.75 INTRM1 DRILL DDRL P Drill ahead f/12,500' to 12,594' 12,500.0 12,594.0 00:00 00:45 9/5/2016 9/5/2016 0.50 INTRM1 DRILL RGRP T Circulate w/350 gpm @ 800 psi. 12,594.0 12,594.0 00:45 01:15 Shaker screens blinded off. C/O all shaker screens on shaker #2. Rubber seal in back of shaker fell off & took some down time to put back into position. 9/5/2016 9/5/2016 10.75 INTRMI DRILL DDRL P Drill ahead f/12,594' to 14,210' MD / 12,594.0 14,210.0 01:15 12:00 6,723' TVD, ADT 7.41 hrs, ECD 11.07 ppg, 795 gpm, 3170 psi, PU wt 260 k, SO wt 150 k, ROT wt 190 k, 180 rpm, Trq 30/15 k ft lbs, 30/35 wob. 9/5/2016 9/5/2016 2.00 INTRM1 DRILL DDRL P Drill ahead f/14,210' to 14,468' MD / 14,210.0 14,468.0 12:00 14:00 6,820' TVD, ADT 1.04 hrs 9/5/2016 9/5/2016 2.50 INTRM1 DRILL CIRC P Circ 2 B/U w/795 gpm, 3250 psi, 170 14,468.0 14,374.0 14:00 16:30 rpm, 17-22 k trq. SIMOPS - PJSM on installing RCD bearing. Rack back 1 stand DO to 14,374' 9/5/2016 9/5/2016 0.75 INTRM1 DRILL MPDA P F/C (static) Remove trip nipple & 14,374.0 14,374.0 16:30 17:15 install RCD bearing. 9/5/2016 9/5/2016 0.50 INTRM1 DRILL REAM P W&R f/14,374' to 14,468'w/795 gpm 14,374.0 14,468.0 17:15 17:45 @ 3010 psi. Break in RCD bearing with various rpm's 9/5/2016 9/6/2016 6.25 INTRM1 DRILL DDRL P Drill ahead f/14,468'to 14,950' MD / 14,468.0 14,950.0 17:45 00:00 6,997' TVD, ADT 3.96 hrs, ECD 11.37 ppg, 795 gpm, 3500 psi, PU wt 275 k, SO wt 142 k, ROT wt 194 k, 180 rpm, Trq 28.5/19 k ft lbs, 20/25 wob. 9/6/2016 9/6/2016 12.00 INTRM1 DRILL DDRL P Drill ahead (/14,950' to 15,830' MD / 14,950.0 15,830.0 00:00 12:00 7,305' TVD, ADT 8.6 hrs, ECD 11.61 ppg, 795 gpm, 3500 psi, PU wt 295 k, SO wt 150 k, ROT wt 175 k, 180 rpm, Trq 28/19 k ft lbs, 15/20 wob. 9/6/2016 9/7/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/15,830' to 16,530' MD / 15,830.0 16,530.0 12:00 00:00 7,464' TVD, ADT 9.4 hrs, ECD 11.65 ppg, 795 gpm, 3920 psi, PU wt 315 k, SO wt 145 k, ROT wt 200 k, 180 rpm, Trq 32/22 k ft lbs, 20/30 wob. Page 8/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 r • r' Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (fiKB) End Depth (ftKB) 9/7/2016 9/7/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/16,530' to 17,047' MD / 16,530.0 17,047.0 00:00 12:00 7,562' TVD, ADT 9.48 hrs, ECD 11.5 ppg, 795 gpm, 3700 psi, PU wt 325 k, SO wt 135 k, ROT wt 210 k, 180 rpm, Trq 34/27 k ft lbs, 34/27 wob. 9/7/2016 9/7/2016 2.75 INTRM1 DRILL DDRL P Drill ahead f/17,047'to 17,048' MD / 17,047.0 17,048.0 12:00 14:45 7,563' TVD, ADT 1.67 hrs. Not able to make new footage. Weight transfer to bit. Decision made to close under reamer and see if that would aid in drilling ahead. 9/7/2016 9/7/2016 1.25 INTRM1 DRILL CIRC P Drop 1.625" ball to close under reamer 17,048.0 17,048.0 14:45 16:00 Initial 795 gpm, 3810 psi, 2627 trpm Final 795 gpm, 4070 psi, 3125 trpm 9/7/2016 9/7/2016 0.50 INTRM1 DRILL DDRL T Drill ahead f/17,048' to 17,049' MD / 17,048.0 17,049.0 16:00 16:30 7,564' TVD, ADT .40 hrs. Decision made to call TD short due to nat able to make new footage. ECD 11.44 ppg, 795 gpm, 3950 psi, PU wt 325 k, SO wt 135 k, ROT wt 210 k, 180 rpm, Trq 34/27 k ft lbs, 34/27 wob. 9/7/2016 9/8/2016 7.50 INTRM1 CASING CIRC P Circulate hole clean for 4 B/U w/795 - 17,049.0 17,030.0 16:30 00:00 750 gpm, 4020 - 3860 psi, 180 rpm, 23/29 k trq. L/D single joint to 17,030' 9/8/2016 9/8/2016 5.00 INTRM1 CASING CIRC P Circulate hole clean for 4 B/U (8 total) 17,030.0 17,030.0 00:00 05:00 w/785 - 750 gpm, 4100 - 3900 psi, 180 rpm, 23/29 k trq. Maintain ECD's 11.6 ppg 9/8/2016 9/8/2016 2.00 INTRM1 CASING CIRC P Weight up from 10.3 ppg to 10.6 ppg 17,030.0 17,030.0 05:00 07:00 w/750 gpm @ 3980 psi 9/8/2016 9/8/2016 1.00 INTRM1 CASING OWFF P Perform MPD finger print on the 17,030.0 17,030.0 07:00 08:00 Kuparuk C. Rotate 10 rpm @ 25 k trq. 9/8/2016 9/8/2016 2.25 INTRM1 CASING CIRC P Weight up from 10.6 ppg to 10.8 ppg 17,030.0 17,030.0 08:00 10:15 w/700 gpm @ 3600 psi 9/8/2016 9/8/2016 0.25 INTRM1 CASING OWFF P F/C (static) Rotate 10 rpm @ 25 k trq. 17,030.0 17,030.0 10:15 10:30 9/8/2016 9/8/2016 0.25 INTRM1 CASING MPDA P Line up MPD equipment to strip OOH 17,030.0 17,030.0 10:30 10:45 9/8/2016 9/8/2016 1.00 INTRMI CASING SMPD T Attempt to Strip OOH as per back 17,030.0 16,998.0 10:45 11:45 schedule f/17,030' to 16,998'. Tight hole attempt to work thru with no success. 9/8/2016 9/8/2016 2.00 INTRM1 CASING BKRM P BROOH f/16,998' to 16,811' w/650 16,998.0 16,811.0 11:45 13:45 gpm @ 3040 - 3280 psi, 100 rpm @ 27 - 35 k trq 9/8/2016 9/8/2016 1.75 INTRM1 CASING CIRC T Circ B/U w/650 gpm @ 3310 psi, 100 16,811.0 16,811.0 13:45 15:30 rpm @ 21 - 26 k trq 9/8/2016 9/8/2016 0.50 INTRMI CASING OWFF T F/C (static) Rotate 10 rpm @ 25 k trq. 16,811.0 16,811.0 15:30 16:00 9/8/2016 9/8/2016 1.50 INTRM1 CASING SMPD T Attempt to Strip OOH as per back 16,811.0 16,529.0 16:00 17:30 schedule f/16,811' to 16,529'. Tight hole attempt to work thru losing down weight. Decesion made to run back in hole. 9/8/2016 9/8/2016 0.75 INTRM1 CASING REAM T W&R f/16,529' to 16,811' w/600 gpm, 16,529.0 16,811.0 17:30 18:15 2990 - 3080 psi, 100 rpm, 20 - 25 k trq Page 9/73 Report Printed: 12/1/2016 r� Operations Summary (with Timelog Depths) a= CD5-99 r, • a ` Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/8/2016 9/8/2016 2.25 INTRM1 CASING CIRC T Circ B/U w/650 gpm @ 3310 psi, 100 16,811.0 16,811.0 18:15 20:30 rpm @ 21 - 26 k trq. Adjust parameters to keep ECD below 11.8 ppg 9/8/2016 9/9/2016 3.50 INTRM1 CASING BKRM P BROOH holding 11.5 ppg ECD on 16,811.0 16,177.0 20:30 00:00 connections with MPD ramp schedule f/16,811' to 16,177', 580 - 600 gpm, 2850 - 3000 psi, 100 rpm, 22 - 33 k trq. (2 minor pack offs @ 16,355'& 16,205') 9/9/2016 9/9/2016 12.00 INTRM1 CASING BKRM P BROOH f/16,177'to 15,024', 580 - 16,177.0 15,024.0 00:00 12:00 590 gpm, 2850 - 2900 psi, 100 - 120 rpm, 22 - 26 k trq. (Pack offs @ 16,092' & 15,879') Holding 11.5 ppg ECD on connections with MPD ramp schedule. 9/9/2016 9/10/2016 12.00 INTRM1 CASING BKRM P BROOH f/15,024' to 12,755', 685 - 15,024.0 12,755.0 12:00 00:00 725 gpm, 2880 - 3520 psi, 120 rpm, 16 - 27 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. 9/10/2016 9/10/2016 2.75 INTRM1 CASING BKRM P BROOH f/12,755' to 12,123'w/700 12,755.0 12,123.0 00:00 02:45 gpm, 3410 psi, 120 rpm, 16 - 20 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. 9/10/2016 9/10/2016 0.50 INTRM1 CASING SVRG P Service rig. 12,123.0 12,123.0 02:45 03:15 SIMOPS C/O swab on mud pump #1. Circ w/mud pump #2 405 gpm @ 1380 psi, 120 rpm 17 k trq. 9/10/2016 9/10/2016 0.50 INTRM1 CASING RGRP T C/O swab on mud pump #1. Circ 12,123.0 12,123.0 03:15 03:45 w/mud pump #2 405 gpm @ 1380 psi, 120 rpm 17 k trq. 9/10/2016 9/10/2016 9.00 INTRM1 CASING BKRM T BROOH f/12,123'to 9,770'w/700 - 12,123.0 9,770.0 03:45 12:45 800 gpm, 3410 psi, 120 rpm, 13 - 15 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. Pumped high vis sweep 9/10/2016 9/10/2016 1.75 INTRM1 CASING CIRC T Circ 2 B/U w/800 gpm, 3100 - 3410 12,123.0 9,770.0 12:45 14:30 psi, 120 rpm 13 - 14 k trq. 9/10/2016 9/10/2016 0.50 INTRM1 CASING OWFF T F/C (static) ROT 7 rpm, 10 k trq. Line 9,770.0 9,770.0 14:30 15:00 up MPD 9/10/2016 9/10/2016 0.50 INTRM1 CASING SMPD T Strip OOH f/9,770' to 9,730' Tight 9,770.0 9,730.0 15:00 15:30 hole, 55k over pull. Attempt to work thru 3 times with no success. Decision to cont. BROOH 9/10/2016 9/11/2016 8.50 INTRM1 CASING BKRM T BROOH f/9,770' to 8,600'w/800 gpm, 9,770.0 8,600.0 15:30 00:00 3130 - 3490 psi, 120 rpm, 11 - 19 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. Minor pack offs 9,185'& 9,058'. Pumped nut plug sweeps to aid in BHA balling Page 10/73 Report Printed: 1 2/112 01 6 Operations Summary (with Timelog Depths) ` CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/11/2016 9/11/2016 10.25 INTRM1 CASING BKRM T Continue BROOH from 8,800' MD to 8,600.0 7,232.0 00:00 10:15 7,232' MD @ 800 gpm, 3400-3250 psi, 120 rpm, 16.5-19k TQ, holding 11.5 ppg on connections with MPD. Experience tight spots and packoffs @ 8479', 8399', 7964', 7957', 7837', 7400'. Pipe displacement + losses of 7 -9 bbl per 5 stands. 9/11/2016 9/11/2016 0.75 INTRM1 CASING BKRM T Continue BROOH from 7,232' MD to 7,232.0 6,950.0 10:15 11:00 6,950' MD @ 800 gpm, 3030 psi, 120 rpm, 21.5k -9k TQ. Not holding back pressure on connections with MPD. Adjust pulling speed to maintain ECD below 12.0 ppg. 9/11/2016 9/11/2016 1.50 INTRM1 CASING CIRC T CBU @ 6,950' MD @ 800 gpm, 2990- 6,950.0 6,856.0 11:00 12:30 2900 psi, 120 rpm, 7.5k TQ. Take SPR's and rack back stand to 6.856' MD. 9/11/2016 9/11/2016 2.00 INTRM1 CASING OWFF T Flow check well. Observe slight flow, 6,856.0 6,856.0 12:30 14:30 decreasing. Initial 2.3 bph, Final .9 bph. Shut in chokes and monitor pressure for buildup. Observed pressure hover @ 6-12 psi for 15 minutes (thermal expansion). Consult with engineers, agree to continue POOH. Line up to strip out with MPD 9/11/2016 9/11/2016 0.25 INTRM1 CASING SMPD T Attempt to strip out with MPD from 6,856.0 6,856.0 14:30 14:45 6,856' to 6,846' MD. Pulled 50k over 3X, unable to pull through, able to slack off free. P/U=170k, S/0=125k, ROT=140k 9/11/2016 9/12/2016 9.25 INTRM1 CASING BKRM T Continue BROOH from 6,856' MD to 6,856.0 4,684.0 14:45 00:00 4,684' MD @ 795 gpm, 3350-2870 psi, 120 rpm, 6k-11 k TQ. Not holding back pressure on connections with MPD. Pumped 10 ppb Nut Plug sweep @ 6,573'. Pump 1 BU @ 4,971' MD while backreaming stand due high ECD (12.0 ppg+). Adjust pulling speed to maintain ECD below 12.0 ppg. Backreaming @ —300-500 fph, observing minor packoffs and over pull / torque at higher pulling speeds. Good pipe displacement, losing average 3 bbl per 5 stands after including losses from shakers to GIS. 9/12/2016 9/12/2016 1.00 INTRM1 CASING BKRM T Continue backreaming out of hole 4,684.0 4,499.0 00:00 01:00 from 4,684' MD to 4,499' MD, 800 gpm, 3120-3210 psi, 120 rpm, 6k Tq. Pulling speed reduced to 200-300 fph. to maintain ECD below 12.0 ppg EMW. Observing overpull, torque and pump pressure indicating slight packing off. 9/12/2016 9/12/2016 1.00 INTRM1 CASING BKRM T Pumped sweep around while 4,499.0 4,405.0 01:00 02:00 backreaming stand to 4,405' MD. Circulate 12.8 ppg sweep with 10 ppb Nut Plug around @ 800 gpm, 3240 psi, 150 rpm, 5.5k TQ, observed substantial increase in cuttings returns. Page 11/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/12/2016 9/12/2016 0.75 INTRMI CASING BKRM T Continue backreaming stand to 4,310' 4,405.0 4,310.0 02:00 02:45 MD while circulating additional 1.5 bottoms up due to observing overpull after sweep around. Perform 275 bbl whole mud dilution. 9/12/2016 9/12/2016 4.25 INTRM1 CASING BKRM T Continue backreaming out of hole 4,310.0 3,461.0 02:45 07:00 from 4,310' MD to 3,461' MD, 800 gpm, 3120 psi, 120 rpm, 4k Tq. Pulling speed —600-700 fph maintaining ECD below 12.0 ppg EMW. Observing overpull, torque and pump pressure indicating slight packing off. 9/12/2016 9/12/2016 0.50 INTRM1 CASING BKRM T Pumped sweep around while 3,461.0 3,367.0 07:00 07:30 backreaming stand to 3,367' MD. Circulate 12.8 ppg sweep with 10 ppb Nut Plug around @ 800 gpm, 2670- 2340 psi, 150 rpm, 4.5k TQ, observed substantial increase in cuttings returns. 9/12/2016 9/12/2016 4.00 INTRM1 CASING BKRM T Continue backreaming out of hole 3,367.0 2,517.0 07:30 11:30 from 3,367' MD to 2,517' MD, 750 gpm, 2670-2340 psi, 120 rpm, 3-6k Tq. Varying pulling speed from 100- 500 fph maintaining ECD below 12.0 ppg EMW. Observing overpull, torque and pump pressure indicating packing off. Noted packoffs at 3255', 3250', 3244', 3237', 3172', 2752', 2739', 2602, 2593'. Hole unloaded @ 2,575' MD. 9/12/2016 9/12/2016 0.50 INTRM1 CASING CIRC T Circulated 12.8 ppg weighted Nut Plug 2,517.0 2,517.0 11:30 12:00 sweep around @ 750 gpm, 2710-2360 psi, 120-150 rpm, 2.5-4k TQ. Hole unloaded large amounts of clay returns. 9/12/2016 9/12/2016 1.75 INTRM1 CASING BKRM T Continue backreaming out of hole 2,517.0 2,328.0 12:00 13:45 from 2,517' MD to 2,328' MD, 750-800 gpm, 2260-2440 psi, 100-150rpm, 1.5- 3k Tq. Rotate 40 rpm pulling reamer, stabilizers and bit through shoe. Hole unloaded again @ 2,450' MD. 9/12/2016 9/12/2016 0.75 INTRM1 CASING CIRC T Circulate artound 32 bbl Nut Plug 2,328.0 2,328.0 13:45 14:30 sweep and CBU x 5 @ 795 gpm, 2160 -2350 psi, 100 rpm, 2-2.5k Tq. 9/12/2016 9/12/2016 2.00 INTRM1 CASING OWFF P Rack back stand to 2,233' MD. Blow 2,328.0 2,233.0 14:30 16:30 down top drive. Flow check well, slight flow decreasing. Initial= 1.8 bph, Final= .74 bph. 9/12/2016 9/12/2016 0.50 INTRM1 CASING MPDA T Line up to strip out with MPD. Pump 2,233.0 2,233.0 16:30 17:00 @ 5 bpm, set chokes to hold 100 psi annular pressure. Observe mud flowing out drill string indicating floats not holding. Decision made to pull RCD and pull on elevators from shoe. 9/12/2016 9/12/2016 0.75 INTRM1 CASING MPDA P Pull RCD and strip element from pipe. 2,233.0 2,233.0 17:00 17:45 Install trip nipple. P/1.1I=120k, S/O=115k. Page 12/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftK8) 9/12/2016 9/12/2016 0.50 INTRM1 CASING TRIP T POOH on elevators from 2,233' MD to 2,233.0 2,139.0 17:45 18:15 2,139' MD. Observe 3 bbl gain and 10- 15k overpull. Flow checked static, pulled 20' and observed severe swabbing, RBIH and observe mud being pushed away. BHA appears to be packed off with clay. Decision made to pump out of hole. 9/12/2016 9/12/2016 0.75 INTRM1 CASING PMPO T Pump out of hole from 2,139' MD to 2,139.0 1,760.0 18:15 19:00 1,760' MD @ 795 gpm, 2300-2740 psi. Observing large clay balls in decent quantities on shakers. 9/12/2016 9/12/2016 2.25 INTRM1 CASING BKRM T Added 30 rpm to clean up casing, 1,760.0 823.0 19:00 21:15 continued BROOH from 1,760' MD to 823' MD @ 795 gpm, 2300 psi, 30 rpm, 1-1.5k TQ. Shakers loaded up. 9/12/2016 9/12/2016 0.50 INTRM1 CASING CIRC T Pumped 34 bbl 10 ppb Nut Plug 823.0 823.0 21:15 21:45 sweep to clean BHA, circulate 3X bottoms up @ 795 gpm, 2360-2450 gpm, 30 rpm 1 k Tq until shakers cleaned up. Sweep brought back large chunks of hard clay, appeared to clean BHA. 9/12/2016 9/13/2016 2.25 INTRM1 CASING OWFF P Blow down top drive and monitor well 823.0 823.0 21:45 00:00 for flow. Observe flow steady at .69 bph for first hour, then decreased only to .55 bph after 2 hours. Checking return flow via vis cup every 5 minutes. 9/13/2016 9/13/2016 1.00 INTRMI CASING OWFF P Continue OWFF. Initial flow .6 bph 823.0 823.0 00:00 01:00 measured at possum belly via vis cup. Observe flow reduce to static at possum belly and at flow nipple. 9/13/2016 9/13/2016 1.00 INTRM1 CASING TRIP T POOH on elevators from 831' MD to 823.0 541.0 01:00 02:00 541' MD. Calculated fill=5 bbl, Actual fill= 3bbl. Swabbing and observe 5-8k overpull on the last stand. P/U=90k, S/0=90k. 9/13/2016 9/13/2016 2.00 INTRM1 CASING BKRM T Backream out of hole from 541' MD to 541.0 181.0 02:00 04:00 181' MD, 650-450 gpm, 1450-620 psi, 60-30 rpm, .7k Tq. P/U=75k, S/0=75k. Stand back HWDP. Observe high ECD 12-13 ppg, no real cuttings returns on shakers. 9/13/2016 9/13/2016 2.00 INTRM1 CASING BHAH P POOH and UD BHA #2 from 181' MD 181.0 78.0 04:00 06:00 to 78' pumping 4 bpm 90 psi to avoid swab. L/D BHA per SLB DD/ MWD. (Note: Both floats damaged/failed. Flappers broken off and 5P float housing washed out.) 9/13/2016 9/13/2016 1.25 INTRM1 CASING OWFF P Observe well for flow, slight trickle 78.0 78.0 06:00 07:15 @ .5 bph measured with vis cup @ possum belly. SIMOPS- L/D tools and equipment. 9/13/2016 9/13/2016 0.50 INTRM1 CASING BHAH P Continue UD BHA from 78' per SLB 78.0 0.0 07:15 07:45 DD/MWD reps. Monitor well on TT no measurable gain. Total trip Calculated fill 146 bbl, Actual Fill=588 bbl. Page 13/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/13/2016 9/13/2016 3.00 INTRM1 CASING OWFF T Observe well for flow, Slight trickle 0.0 0.0 07:45 10:45 @ .6 bph flow rate via vis cup. Flow not slowing down after 3 hrs. SIMOPS-M/U stack washer on joint of 5" DP, UD BHA tools and equip via beaver slide. Prep tool for C/O rams and test BOPE. NOV R/U to perform diagnostics on shakers. P/U bail extensions. 9/13/2016 9/13/2016 1.00 INTRM1 CASING OWFF T Close blind rams and perform exhale 0.0 0.0 10:45 11:45 test. Fill choke line, choke manifold, kill line and MGS with 10.8 ppg mud. Close choke and monitor pressure @ choke panel / manifold for 60 minutes. 10 psi built on choke. SIMOPS- P/U cleanout BHA components via beaverslide. 9/13/2016 9/13/2016 3.25 INTRM1 CASING OWFF T Continue with exhale test. Open choke 0.0 61.0 11:45 15:00 and monitor returns @ MGS in pits .3 bph @ 12:00, .54 bph @ 12:45. Close choke @ 12:45. Pressure build to 15 psi @ 14:00 hrs, 23 psi @ 15:00 hrs. SIMOPS- M/U cleanout BHA to 61'. 9/13/2016 9/13/2016 1.50 INTRM1 CASING BHAH T Open blind rams and M/U cleanout 61.0 774.0 15:00 16:30 BHA # 3 to 774' MD. 9/13/2016 9/13/2016 0.50 INTRM1 CASING MPDA T Fill pipe and shut in annular. Adjust 774.0 774.0 16:30 17:00 pressure to strip in RCD for installation. 9/13/2016 9/13/2016 0.75 INTRM1 CASING MPDA T Pull trip nipple, stab bearing on stand 774.0 774.0 17:00 17:45 and install RCD bearing/element. Open annular. Observed no pressure increase on choke during installation, annular weeping due to low pressure for stripping in element. 9/13/2016 9/13/2016 1.25 INTRM1 CASING SMPD T Line up MPD and RIH on 5" DP from 774.0 2,280.0 17:45 19:00 774' MD to 2,280' MD holding 80 psi annular pressure with MPD chokes. Good pipe displacement 12.5 bbl per 5 stand closed end displacement. 9/13/2016 9/13/2016 0.25 INTRM1 CASING DHEQ T Fill pipe and shallow pulse test MWD 2,280.0 2,280.0 19:00 19:15 @ 450 gpm, 820 psi. 9/13/2016 9/13/2016 0.50 INTRM1 CASING CIRC T Circulate bottoms up @ 750 gpm, 2,280.0 2,280.0 19:15 19:45 1890 psi, 30 rpm, 2K TQ. Observed 10.8+ ppg mud out steady, no gas. 9/13/2016 9/13/2016 0.75 INTRM1 CASING OWFF T Shut in MPD chokes and monitor for 2,280.0 2,280.0 19:45 20:30 pressure buildup. Built 9 psi, from 5 to 14 psi in 10 minutes. Observed floats not holding and leaking out drill pipe. Consult with Eng and decide to continue running in hole. 9/13/2016 9/14/2016 3.50 INTRM1 CASING SMPD T Continue stripping in hole from 2.280' 2,280.0 5,972.0 20:30 00:00 MD to 5,972' MD, filling pipe every 20 stands, holding 80 psi annular pressure with MPD chokes. Good pipe displacement 12.5 bbl per 5 stand closed end displacement. P/U=150k, S/0=130k, ROT=123k. Page 14/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) Y CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/14/2016 9/14/2016 1.50 INTRM1 CASING SMPD T Strip in hole with MPD holding 80 psi 5,972.0 7,371.0 00:00 01:30 annular pressure from 5,972' MD to 7,371' MD. Filling pipe every 20 stands. P/U=165k, S/0=125k, ROT=145k. 7.67 bbl over calculated displacement. 9/14/2016 9/14/2016 1.00 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 7,371.0 7,371.0 01:30 02:30 750 gpm, 2650 psi, 120 rpm, 6k Tq. Gas peaked @ 310 units, ECD 11.45- 11.35 ppg EMW. Mud density out steady at 10.8-10.8+. 9/14/2016 9/14/2016 3.25 INTRM1 CASING SMPD T Continue stripping in hole with MPD 7,371.0 11,133.0 02:30 05:45 holding 80 psi annular pressure from 7,371' MD to 11,133' MD, filling pipe every 20 stands. P/U=207k, S/0=145k, ROT=170k. 1.85 bbl under calculated displacement. 9/14/2016 9/14/2016 1.50 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 11,133.0 11,133.0 05:45 07:15 750 gpm, 2170-3190 psi, 140 rpm, 11- 12k Tq. Gas peaked @ 261 units, ECD 11.52 ppg EMW. Mud density out steady at 10.8-10.8+. 9/14/2016 9/14/2016 0.75 INTRM1 CASING SMPD T Continue stripping in hole with MPD 11,133.0 11,886.0 07:15 08:00 holding 80 psi annular pressure from 11,133' MD to 11,886' MD. Observe flow increase from 12%-22%..78 bbl over calculated displacement. 9/14/2016 9/14/2016 0.50 INTRM1 CASING OWFF T OWFF, stab FOSV as precaution. 11,886.0 11,886.0 08:00 08:30 Shut down MPD pump and close MPD chokes to observe pressure build up. Monitor pressure every 5 minute= 24 psi, 25, 26, 26, 22, 20 psi while rotating 10 rpm, 12-13k Tq. 9/14/2016 9/14/2016 1.50 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 11,886.0 11,886.0 08:30 10:00 450-750 gpm, 14560-3320 psi, 140 rpm, 12-15.5k Tq. Mud extremely aired up, 25 bbl gain in pits at 4480 stks pumped. Add defoamer and pit level returned to normal. P/U=210k, S/O=150k, ROT= 170k. 9/14/2016 9/14/2016 3.75 INTRM1 CASING SMPD T Continue stripping in hole with MPD 11,886.0 14,419.0 10:00 13:45 holding 120 psi annular pressure from 11,886' MD to 14,419' MD. 1 bbl over on displacement. P/U=235k, S/0=155k @ 13,482'. 9/14/2016 9/14/2016 1.50 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 14,419.0 14,419.0 13:45 15:15 750 gpm, 2960-3530 psi, 150 rpm, 15- 19k Tq. Mud density out steady at 10.8-10.8+ with peak of 11.1 ppg, no light spots. 9/14/2016 9/14/2016 1.25 INTRM1 CASING CIRC T Continue stripping in hole with MPD 14,419.0 14,439.0 15:15 16:30 holding 120 psi annular pressure from 14,419' MD to 14,439' MD. Mud flowing up drillstring due floats not holding. Pump 800 gpm, 3230 psi to clear floats. Continue pumping 750 gpm, 2800 psi, 100 rpm, 15-16k Tq holding 90 psi on chokes. Page 15/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/14/2016 9/14/2016 4.25 INTRM1 CASING SMPD T Strip in hole holding 120-80 psi 14,439.0 15,619.0 16:30 20:45 annular pressure with MPD. Floats still not holding, screwing in to each connection. SIH from 14,419' MD to 15,619' MD, string took weight. Attempt to work through tight spot with up to 50K down weight without success. Decide to pull above HRZ and increase density prior to further efforts. 9/14/2016 9/14/2016 2.50 INTRM1 CASING SMPD T Strip out of hole from 15,619' MD to 15,619.0 14,888.0 20:45 23:15 14,888' MD holding 80 psi AP pulling and 40 psi in slips. Floats still not holding. 9/14/2016 9/15/2016 0.75 INTRM1 CASING CIRC T Establish circulation stage up to 750 14,888.0 14,888.0 23:15 00:00 gpm, 2830-2930 psi, 130 rpm, 18-20k Tq. Begin weight up from 10.8 ppg to 11.1 ppg. 9/15/2016 9/15/2016 1.75 INTRM1 CASING CIRC T Continue weighting up from 10.8 ppg 14,888.0 14,888.0 00:00 01:45 to 11.1 ppg @ 14,888' MD, 750 gpm, 2660 psi, 130 rpm, 19-20.5k Tq. Obtain new SPR's with 111.1 ppg mud. P/U=280k, S/0=150k, ROT=202k. 9/15/2016 9/15/2016 1.25 INTRM1 CASING SMPD T Strip in hole from 14,888' MD to 14,888.0 15,544.0 01:45 03:00 15,544' MD. 9/15/2016 9/15/2016 2.25 INTRM1 CASING WASH T Wash down from 15,544' MD @ 2 15,544.0 15,521.0 03:00 05:15 bpm to 15,616' MD, slowly wash down to 15,521' MD would not pass any further with 40k WOB. Packing off periodically, from 270 to 350 psi, pull tight 50-75k over after working down. 9/15/2016 9/15/2016 0.25 INTRM1 PLUG REAM T Begin rotation @ 120 rpm 20-24k Tq, 15,521.0 15,521.0 05:15 05:30 stage pump up to 550 gpm, 1880 psi attempt to ream down and packoff at 15,620' MD. 9/15/2016 9/15/2016 8.50 INTRM1 PLUG REAM T Coninue wash and ream with 400-600 15,521.0 15,670.0 05:30 14:00 gpm, 1040-1810 psi, 100-180 rpm, 22- 33k Tq. Numerous packoffs of 50-70 psi, stalling out top drive. Ream down to 15670' MD. P/U=290, S/O=150k, ROT=205k @ 15,653' MD. 9/15/2016 9/15/2016 0.50 INTRM1 PLUG BKRM T Backream through tight spot from 15,670.0 15,634.0 14:00 14:30 15,670' MD to 15,634' MD @ 500 gpm, 1270-1300 psi, 100 rpm, 26k - 29k Tq. 9/15/2016 9/15/2016 0.75 INTRM1 PLUG REAM T Wash and ream from 15,634' MD to 15,634.0 15,664.0 14:30 15:15 15,664' MD 500-625 gpm, 1300-1750 psi, 100-150 rpm, 25-31 k Tq, torquing up and difficult going down. (Decision made to POOH and plug back) 9/15/2016 9/15/2016 6.75 INTRM1 PLUG BKRM T Backream out of hole from 15,664' MD 15,664.0 15,155.0 15:15 22:00 to 15,155' MD @ 625 gpm, 1500-1750 psi, 150 rpm, 25-30k Tq. Packing off and stalling out. Lost Hiline power @ 17:05, on generators. Back on Hiline @ 19:45 hrs. Page 16/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) �CD5-99 'i. Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Star, Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/15/2016 9/16/2016 2.00 INTRM1 PLUG PMPO T Pump out of HRZ @ 3 bpm, 300-420 15,155.0 14,999.0 22:00 00:00 psi. Pulled up to 40k over, slack off and re -try, pull through @ 15,040' MD. S/0=310k. 9/16/2016 9/16/2016 0.25 INTRM1 PLUG PMPO T Continue pumping out of hole from 14,999.0 14,888.0 00:00 00:15 14,999' MD to 14,888' MD above the HRZ @ 3.2 bpm, 380 psi. 9/16/2016 9/16/2016 1.75 INTRM1 PLUG CIRC T Circulate and condition @ 14,888' MD 14,888.0 14,888.0 00:15 02:00 stage from 550-800 gpm, 1180-2120 psi, 120-180 rpm, 22-26k TQ. P/U=310k, S/0=140k, ROT=205k. SIMOPS- PJSM on pulling MPD element and install trip nipple. 9/16/2016 9/16/2016 0.50 INTRM1 PLUG MPDA T Flush MPD system and blow down 14,888.0 14,888.0 02:00 02:30 MPD chokes and lines. Pull RCD element and install trip nipple. 9/16/2016 9/16/2016 0.50 INTRM1 PLUG OWFF T Observe well for flow for 30 minutes, 14,888.0 14,888.0 02:30 03:00 static with slight drop about 1' in 30 min. Rotate string 5 rpm 19.5k Tq. 9/16/2016 9/16/2016 1.00 INTRM1 PLUG PMPO T Obtain SPR's with 11.1 ppg mud. 14,888.0 14,419.0 03:00 04:00 Continue pumping out of hole @ 4 bpm 250-300 psi from 14,888' MD to 14,419' MD, 5 stands. P/U=300k, S/0=145k. Calc fill=3.94 bbl, Actual Fill= 2 bbl inadequate fill. 9/16/2016 9/16/2016 0.25 INTRM1 PLUG OWFF T Observe well for flow, slight flow for 2 14,419.0 14,419.0 04:00 04:15 minutes then static with slight drop to 1" after 10 minutes. Decide to pull 5 more and observe displacement. 9/16/2016 9/16/2016 0.75 INTRM1 PLUG PMPO T Continue pumping out of hole from 14,419.0 13,951.0 04:15 05:00 14,419' MD to 13,951' MD 4 bpm 230 psi. Calc/actual fill = 3.94/4 bbl. Good displacement. 9/16/2016 9/16/2016 2.00 INTRM1 PLUG PMPO T Continue pumping out of hole from 13,951.0 13,107.0 05:00 07:00 13,951' MD to 13,107' MD 4 bpm 200 psi. Calc/actual fill = 3.94/4 bbl per 5 stands. Good displacement. Observe washout in joint of DS50 drill pipe. Lay down bad joint (bottom of stand 132) and replace with good. 9/16/2016 9/16/2016 1.75 INTRMI PLUG PMPO T Continue pumping out of hole from 13,107.0 11,792.0 07:00 08:45 13,107' MD to 11,758' MD 4 bpm 410 psi. Good displacement. Pulled tight @ 11,758' pulled 45k over and 40k down to breakover. Drop down to 11,792' MD. P/U=225k, S/0=140k. 9/16/2016 9/16/2016 0.25 INTRM1 PLUG BKRM T Backream out from 11,758' MD to 11,792.0 11,792.0 08:45 09:00 11,741' MD @ 550 gpm, 2080 psi, 120 rpm, 17k Tq. At 11,741' torque up to 27.5k. Decision made to CBU. Drop down to 11,792' MD. 9/16/2016 9/16/2016 1.25 INTRM1 PLUG CIRC T Circulate and condition 1 bottoms up 11,792.0 11,792.0 09:00 10:15 from 550-750 gpm, 2080-3510 psi, 150 rpm, 15.5k -17.5k Tq. 9/16/2016 9/16/2016 2.00 INTRM1 PLUG PMPO T Continue pumping out of hole from 11,792.0 10,286.0 10:15 12:15 11,792' MD to 10,286' MD 4 bpm 350 psi. Good displacement. P/U=210k, S/0=140k. 9/16/2016 9/16/2016 0.25 INTRM1 PLUG OWFF T Observe well static. Attempt to pull on 10,286.0 10,286.0 12:15 12:30 trip tank, swabbing. Page 17/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/16/2016 9/16/2016 1.75 INTRM1 PLUG PMPO T Continue pumping out of hole from 10,286.0 9,341.0 12:30 14:15 10,286' MD to 9,341' MD 3 bpm 270 psi. Pulled tight @ 10,122' MD with 45k overpull. Pull through and tight again @ 9,341' MD 45k over several times. Rotate pipe to free. Stop to CBU. 9/16/2016 9/16/2016 1.50 INTRM1 PLUG CIRC T CBU from 9,341' MD to 9,245' MD @ 9,341.0 9,341.0 14:15 15:45 750 gpm, 3160 psi, 140 rpm, 11.8k Tq. Attempt to pull, pull 45k over decide to BROOH appears to be differential. 9/16/2016 9/17/2016 8.25 INTRM1 PLUG BKRM T Backream out of hole from 9,245' MD 9,341.0 7,000.0 15:45 00:00 to 7,000' MD 550-750 gpm, 1860-2960 psi, 50-140 rpm, 10.5k -11.3k Tq. 9/17/2016 9/17/2016 0.50 INTRM1 PLUG BKRM T Continue backreaming out from 7,000' 7,000.0 6,808.0 00:00 00:30 MD to 6,808' MD @ 750 gpm, 2760 psi, 140 rpm, 8k -10k Tq. 9/17/2016 9/17/2016 1.25 INTRM1 PLUG CIRC T CBU X 2 @ 750 gpm, 2710 psi, 180 6,808.0 6,808.0 00:30 01:45 rpm, 7.5k -9k TQ. Nothing notable on shakers. 9/17/2016 9/17/2016 5.25 INTRM1 PLUG PMPO T Pump out of hole from 6,808' MD to 6,808.0 2,280.0 01:45 07:00 2,280' MD @ 4 bpm, 250-170 psi. P/U=120k, S/O=115k, ROT=118k. 9/17/2016 9/17/2016 0.75 INTRM1 PLUG CIRC T CBU X 2 @ 750 gpm, 2140 psi, 160 2,280.0 2,280.0 07:00 07:45 rpm, 2.5k TQ. CBU X 2 @ 800 gpm, 2320 psi, 160 rpm, 2.5k Tq. 4 bottoms up total. Nothing notable on shakers. Blow down top drive. 9/17/2016 9/17/2016 0.50 INTRM1 PLUG OWFF T Observe well for flow, static. 2,280.0 2,280.0 07:45 08:15 9/17/2016 9/17/2016 2.25 INTRM1 PLUG TRIP T POOH on elevators from 2,280' MD to 2,280.0 774.0 08:15 10:30 774' MD, good displacement. OWFF @ HWDP, static. 9/17/2016 9/17/2016 0.75 INTRM1 PLUG TRIP T Continue POOH on elevators rack 774.0 133.0 10:30 11:15 back HWDP to 133' MD. 9/17/2016 9/17/2016 1.25 INTRMI PLUG BHAH T Lay down cleanout BHA per SLB 133.0 0.0 11:15 12:30 DD/MWD. Total trip Calc fill= 124.88 bbl, Actual Fill= 198.5 bbl. 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP WWWH T Rig up stacj washer and flush 0.0 0.0 12:30 13:00 wellhead and stack @ 10 bpm, 110 psi. R/D stack washer. 9/17/2016 9/17/2016 1.00 INTRMI WHDBOP RURD T Rig up and pull wear ring as per FMC 0.0 0.0 13:00 14:00 rep. 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP RURD T P/U 5" test joint and set test plug. Rig 0.0 0.0 14:00 14:30 up test equipment and fill all lines with water. 9/17/2016 9/17/2016 4.00 INTRM1 WHDBOP BOPE T Test BOPE witnessed by AOGCC Jeff 0.0 0.0 14:30 18:30 Jones, test with 5" and 3'/V test joints. Test annular to 250/2500 psi 5 min ea, Rams and valves 250/3500 psi 5 min ea, chokes drawdown test to 1100 psi. Tested annular, HCR choke/kill, choke valves #1, 12, 13, 14, Auto IBOP, upper rams, 4" Demco on kill line, CV #9, 11, manual.IBOP, HCR kill, needle valve above CV #1. CV# 5, 8, 10, 5" Dart valve, CV# 4, 6, 7, 5" FOSV, CV# 2, HCR choke, manual choke and kill. Lower rams. Page 18/73 Report Printed: 12/1/2016 uperations Summary (with Timelog Vepths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP BOPE T Change out to 3'/" test joint. Perform 0.0 0.0 18:30 19:00 accumulator function test. System pressure=2950, Pressure after functioning= 1500 psi, 200 psi attained=27 sec, Full system recovery= 147 sec. 4 bottle N2 average=2300 psi. 9/17/2016 9/17/2016 1.00 INTRM1 WHDBOP BOPE T Test annular to 250/2500 psi 5 min 0.0 0.0 19:00 20:00 each with 3'/" TJ, Upper rams, lower rams, pull TJ test blind rams all to 250/3500 psi. Drawdown test on manual and auto chokes to 1100 psi. Electrician tested gas alarms. 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP RURD T Blow down choke manifold, choke and 0.0 0.0 20:00 20:30 kill lines. Rig down test equipment. 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP RURD T Pull test plug, install 10" ID wear rig 0.0 0.0 20:30 21:00 per FMC rep. lay down 3'/2' test joint. 9/17/2016 9/17/2016 1.50 INTRM1 PLUG RURD T PJSM and change out DS -50 saver 0.0 0.0 21:00 22:30 sub on top drive. 9/17/2016 9/17/2016 0.75 INTRM1 PLUG SVRG T Service top drive and draw works. 0.0 0.0 22:30 23:15 Perform derrick inspection. 9/17/2016 9/18/2016 0.75 INTRM1 PLUG SLPC T Slip and cut 105' of drilling line. 0.0 0.0 23:15 00:00 9/18/2016 9/18/2016 1.00 INTRM1 PLUG SLPC T Continue cut and slip 105' of drilling 0.0 0.0 00:00 01:00 line, adjust brakes, springs, rollers. 9/18/2016 9/18/2016 1.00 INTRM1 PLUG RURD T Pick up and rig up tongs for P/U 3%2' 0.0 0.0 01:00 02:00 cement stinger. 9/18/2016 9/18/2016 1.50 INTRM1 PLUG PULD T PJSM, M/U 3'/" Diffuser, 30 jts 3'/" 0.0 921.0 02:00 03:30 EUE and XO's to NC50 to 921' MD. 9/18/2016 9/18/2016 6.00 INTRM1 PLUG TRIP T Trip in hole on elevators from 921' MD 921.0 11,280.0 03:30 09:30 to 11,280' MD with cement stinger on 5" DP. P/U=200k, S/0=135k. 9/18/2016 9/18/2016 0.25 INTRM1 PLUG CIRC T Fill pipe, stage up from 3 bpm to 7 11,280.0 11,280.0 09:30 09:45 bpm, 450-720 psi. 9/18/2016 9/18/2016 2.25 INTRM1 PLUG TRIP T Trip in hole on elevators from 11,280' 11,280.0 13,629.0 09:45 12:00 MD to 13,629' MD with cement stinger on 5" DP filling each 20 stands. 9/18/2016 9/18/2016 4.50 INTRM1 PLUG TRIP T Trip in hole on elevators from 13,629' 13,629.0 16,310.0 12:00 16:30 MD to 16,318' MD with cement stinger on 5" DP filling each 20 stands. Lost slack off weight @ 16,318'. Pull up to 16,310' MD, P/U=350k. 9/18/2016 9/18/2016 2.00 INTRM1 PLUG CIRC T Attempt to break circulation, could not 16,310.0 16,201.0 16:30 18:30 establish, pressure up to 1500 psi string appears plugged. Work pipe, pull over 50k. Work pipe until free P/U=295k, S/0=145k pull up to 16,201' MD. Page 19/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) j kYp C D5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/18/2016 9/18/2016 4.25 INTRM1 PLUG TRIP T Continue working string out of hole 16,201.0 14,841.0 18:30 22:45 from 16,201' MD to 14,841' MD. Pulling 500 fph, applying pressure to drill pipe @ 500 psi still appears plugged. Hole fill insufficient. OWFF static and slight drop. Pull stand without trip tank and observe fluid falling in annulus. Pull 5 more stands on trip tank observe correct hole fill, pull 4 more stands to 14,841' MD above FC Slump to clear pipe. 9/18/2016 9/18/2016 0.25 INTRM1 PLUG OWFF T Observe well for flow for 10 minutes, 14,841.0 14,841.0 22:45 23:00 static dropped 6". 9/18/2016 9/18/2016 0.75 INTRM1 PLUG CIRC T Rotate 20 rpm, 18.4k Tq, pressure up 14,841.0 14,841.0 23:00 23:45 string to 500 psi no returns. Line up to reverse circulate, close annular and apply 200 psi to annulus, pump 5 bbl away did not observe returns. Bleed off, open annular and line up to pump down string. Rotate 20 rpm 18.4k Tq and pressure up to 1000 psi and pressure dropped to 600, estabished circulation. 9/18/2016 9/19/2016 0.25 INTRM1 PLUG CIRC T Continue circulating for bottoms up, 3 14,841.0 14,841.0 23:45 00:00 bpm 590 psi, 20 rpm, 15k Tq. 9/19/2016 9/19/2016 0.50 INTRM1 PLUG CIRC T Continue circulate and condition @ 3- 14,841.0 14,841.0 00:00 00:30 4 bpm, 590-600 psi, 20 rpm, 15k Tq. 9/19/2016 9/19/2016 3.00 INTRM1 PLUG CIRC T Continue circulate and condition stage 14,841.0 14,841.0 00:30 03:30 up to 9 bpm, 1160 psi with no rotary. reciprocating pipe. P/U=255k, S/O=150k. 9/19/2016 9/19/2016 3.25 INTRM1 PLUG WASH T Wash down @ 3 bpm from 14,841' 14,841.0 15,930.0 03:30 06:45 MD to 15,930'420-490 psi. Stopped at 15,400' MD and increased rate to 8 bpm 930 psi briefly to test, clear no packing off.Continue in, start packing off at 15,930' MD. 9/19/2016 9/19/2016 0.25 INTRM1 PLUG PMPO T Stand back 1 stand to 15,835' MD. 15,930.0 15,835.0 06:45 07:00 9/19/2016 9/19/2016 1.00 INTRM1 PLUG WASH T Attempt to wash down from 15,835' 15,835.0 15,868.0 07:00 08:00 MD to 15,868' MD @ 4 bpm 490-540 psi. Packing off @ 15,863', 15,868' MD. Decision to pull up to place HV pill. 9/19/2016 9/19/2016 1.00 INTRM1 PLUG PMPO T Pump out of hole from 15,868' MD to 15,868.0 15,691.0 08:00 09:00 15,691' MD @ 3 bpm, 490 psi. 9/19/2016 9/19/2016 1.25 INTRM1 PLUG CIRC T Spot 45 bbl 13.0 ppg HV Gel pill 15,691.0 15,691.0 09:00 10:15 balanced @ 15,691 9/19/2016 9/19/2016 0.75 INTRM1 PLUG TRIP T Pull out of hole on elevators from 15,691.0 15,410.0 10:15 11:00 15,691' MD to 15,410' MD. Calc fill=2.35 bbl, Actual fill +.5 bbl. 9/19/2016 9/19/2016 0.25 INTRM1 PLUG RURD T Blow down top drive and R/U 1502 15,410.0 15,410.0 11:00 11:15 cementing equipment. 9/19/2016 9/19/2016 1.50 INTRM1 PLUG CIRC T Circulate and condition for cement job 15,410.0 15,410.0 11:15 12:45 8 bpm, 1150 psi, reciprocate string from 15,410' MD to 15, 388' MD. P/U=265k, S/O=150k. SIMOPS- PJSM on cementing Page 20/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/19/2016 9/19/2016 1.00 INTRM1 PLUG CMNT T Flood lines and test to 2500 psi. 15,410.0 15,410.0 12:45 13:45 Dowell pumped 26.7 bbl 12.5 ppg Mud Push II, 91.9 bbl of 15.8 ppg Qannik Slurry, 3.7 bbl more bbl 12.5 ppg Mud Push 11. 9/19/2016 9/19/2016 0.50 INTRM1 PLUG CMNT T Displace cement plug with 240 bbl 15,410.0 15,410.0 13:45 14:15 11.1 ppg Mud @ 6 bpm, 540-970 psi. CIP @ 14:19 hrs. 9/19/2016 9/19/2016 2.25 INTRM1 PLUG TRIP T POOH on trip tank @ 500 fph from 15,410.0 14,472.0 14:15 16:30 15,410' MD to 14,472' MD, good pipe displacement. 9/19/2016 9/19/2016 2.50 INTRM1 PLUG CIRC T Establish circulation and circulate 1 14,472.0 14,472.0 16:30 19:00 bottoms up, 13,000 strokes @ 10 bpm, 1360 psi. Observe slight increase in ph from 9.1 to 10.5, no observable cement. 9/19/2016 9/19/2016 4.50 INTRM1 PLUG WOC T Shut down and insert 5" drill pipe 14,472.0 14,472.0 19:00 23:30 wiper ball, continue circulating @ 10 bpm 1360 psi, observe -10 psi when ball hit diffuser. Continue circulating and waiting on cement. 9/19/2016 9/20/2016 0.50 INTRMI PLUG WASH T Wash down @ 3 bpm 410 psi to locate 14,472.0 14,660.0 23:30 00:00 top of cement plug. 9/20/2016 9/20/2016 0.75 INTRM1 PLUG WASH T Wash down from 14,660' MD to 14,660.0 14,782.0 00:00 00:45 14,782' MD. Tag TOC with 5k, then 10k to confirm with 3 bpm, 440 psi. Firm cement @ 14,782' MD. 9/20/2016 9/20/2016 3.25 INTRM1 PLUG PMPO T Pump out of hole from 14,782' MD to 14,782.0 12,033.0 00:45 04:00 12,033' MD @ 3 bpm, 440-410 psi. 9/20/2016 9/20/2016 0.75 INTRM1 PLUG CIRC T Spot 90 bbl HV 13.0 ppg Gel pill @ 12,033.0 12,033.0 04:00 04:45 12,033' MD, 8 bpm 850 psi. Displace with 1740 stks. Reciprocate pipe while displacing. 9/20/2016 9/20/2016 1.50 INTRM1 PLUG TRIP T POOH on elevators from 12,033' to 12,033.0 0.0 04:45 06:15 11,405' MD to place kickoff plug. 9/20/2016 9/20/2016 0.25 INTRM1 PLUG RURD T Blow down top drive. RU 1502 cement 11,405.0 11,405.0 06:15 06:30 equipment and head pin. 9/20/2016 9/20/2016 1.75 INTRM1 PLUG CIRC T Circulate and condition mud at 8 bpm 11,405.0 11,405.0 06:30 08:15 990 psi. Simops - PU BHA components via the beaver slide. PJSM on cement job. 9/20/2016 9/20/2016 1.50 INTRMI PLUG CMNT T SLB pressure tested lines to 2800 psi. 11,405.0 11,405.0 08:15 09:45 Pumped 26.8 bbls 12.5 ppg spacer, 91.7 bbls 17 ppg cement, 3.5 bbls 12.5 spacer and rig dispalced with 140 bbls 11.1 ppg LSND mud. CIP - 09:32 hrs. RD cement equipment. Est TOC - 10, 800' 9/20/2016 9/20/2016 1.75 INTRM1 PLUG TRIP T POH on trip tank from 11,405' to 11,405.0 10,339.0 09:45 11:30 10,339'. 9/20/2016 9/20/2016 0.50 INTRM1 PLUG CIRC T Circulate and condition mud at 10 bpm 10,339.0 10,339.0 11:30 12:00 - 1090 psi. 9/20/2016 9/20/2016 1.00 INTRM1 PLUG CIRC T Circulate and condition at 10 bpm, 10,339.0 10,339.0 12:00 13:00 1080 psi 9/20/2016 9/20/2016 1.50 INTRM1 PLUG CIRC T Drop nerf ball and continue to circulate 10,339.0 10,339.0 13:00 14:30 and condition mud at 10 bpm, 1080 psi. Page 21173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/20/2016 9/20/2016 0.50 INTRM1 PLUG PMPO T Pump out of the hole from 10339' to 10,339.0 10,057.0 14:30 15:00 10057'@ 3 bpm, 320 psi to check for cement rings in drillpipe. Drillpipe clean 9/20/2016 9/20/2016 5.75 INTRM1 PLUG WOC T Wait on cement while circulating at 10 10,057.0 10,057.0 15:00 20:45 bpm, 1080 psi. 9/20/2016 9/20/2016 0.25 INTRM1 PLUG WASH T Wash from 10057' to 10529' while 10,057.0 10,529.0 20:45 21:00 circulating at 3 bpm, 370 psi. Tag cement at 10529' with 5 kips. Pressure increased to 410 psi. Pick up and re -tag at 10529' with 10 kips to confirm TOC. 9/20/2016 9/20/2016 1.75 INTRM1 PLUG CIRC T Circulate bottoms up at 10 bpm at 10,529.0 10,529.0 21:00 22:45 1150 psi. 9/20/2016 9/20/2016 0.25 INTRM1 PLUG OWFF T Monitor well for flow -no flow 10,529.0 10,529.0 22:45 23:00 9/20/2016 9/20/2016 0.25 INTRM1 PLUG TRIP T Attempt to POOH on elevators. Hole 10,529.0 10,529.0 23:00 23:15 trying to swab. 9/20/2016 9/21/2016 0.75 INTRM1 PLUG PMPO T Pump out of hole at 3 bpm , 390 psi. 10,529.0 10,057.0 23:15 00:00 9/21/2016 9/21/2016 5.75 INTRM1 PLUG PMPO T Pump out of hole from 10,057' to 10,057.0 4,306.0 00:00 05:45 4306' at 4 bm - 290 psi. 9/21/2016 9/21/2016 1.00 INTRM1 PLUG TRIP T POH on trip tank from 4306' to 4027'. 4,306.0 4,027.0 05:45 06:45 Hole taking good fill. Observed cement rings inside NC -50 connections. Decision was made to RIH to check middle breaks for cement rings before PU BHA. 9/21/2016 9/21/2016 0.25 INTRM1 PLUG SFTY T PJSM on change of scope. Clean rig 4,027.0 4,027.0 06:45 07:00 floor. 9/21/2016 9/21/2016 7.50 INTRM1 PLUG TRIP T RIH with 5" DP from derrick breaking 4,027.0 10,339.0 07:00 14:30 all connections to remove cement rings. There were no cement rings in the tool joint of the top joint on each stand. 9/21/2016 9/21/2016 3.50 INTRM1 PLUG CIRC T Make up top drive and break 10,339.0 10,339.0 14:30 18:00 circulation. Stage flowrate up to 11 bpm @ 1350 psi. Circulate and condition mud 9/21/2016 9/21/2016 0.50 INTRM1 PLUG OWFF T Blow down top drive and monitor well. 10,339.0 10,339.0 18:00 18:30 Static 9/21/2016 9/21/2016 1.50 INTRM1 PLUG TRIP T Pull out of hole on elevators. Proper 10,339.0 9,394.0 18:30 20:00 fill on first 5 stand. 2nd 5 stand had improper fill. 9/21/2016 9/22/2016 4.00 INTRM1 PLUG PMPO T Pump out of the hole from 9394' to 9,394.0 5,730.0 20:00 00:00 5730' while pumping 3 bpm @ 350 psi. 9/22/2016 9/22/2016 0.75 INTRM1 PLUG PMPO T Pump out of hole at 3 bpm - 330 psi 5,730.0 5,070.0 00:00 00:45 from 5730' to 5070'. 9/22/2016 9/22/2016 1.25 INTRM1 PLUG TRIP T POH on trip tank from 5070' to 4220'. 5,070.0 4,220.0 00:45 02:00 Good hole fill. 9/22/2016 9/22/2016 0.50 INTRM1 PLUG CIRC T Pump 18.5 bbls 12.1 ppg dry job. Blow 4,220.0 4,220.0 02:00 02:30 down top drive. Clean floor and RD mud bucket. 9/22/2016 9/22/2016 3.75 INTRMI PLUG TRIP T POH on trip tank from 4220' to 2237'. 4,220.0 2,237.0 02:30 06:15 Break each connection to clean out cement rins in tools joints.. 9/22/2016 9/22/2016 0.25 INTRM1 PLUG OWFF T Monitor well at shoe. Static 2,237.0 2,237.0 06:15 06:30 Page 22/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 r- • t ' Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -x Operation (ftKB) End Depth (ftKB) 9/22/2016 9/22/2016 1.75 INTRM1 PLUG TRIP T POH on trip tank from 2237' to 921'. 2,237.0 921.0 06:30 08:15 Break each connection to clean out cement rings in tools joints.. 9/22/2016 9/22/2016 0.50 INTRM1 PLUG RURD T RU 3 1/2" handling equipment and 921.0 921.0 08:15 08:45 power tongs. 9/22/2016 9/22/2016 1.75 INTRM1 PLUG PULD T PJSM. POH and LD 3 1/2" cement 921.0 0.0 08:45 10:30 string. 9/22/2016 9/22/2016 1.50 INTRM1 PLUG RURD T Clear rig floor. Rig down tubing tongs 0.0 0.0 10:30 12:00 and elevators. Clean pollution pan and flow box of cement contaminated mud. Change out trip tank hole fill line. Laydown 3-1/2" diffuxer and sent to mechanic shop for retrieval of nerf balls. Pre tools for BOPE test. Inspect #2 mud pump valves and sets - OK. 9/22/2016 9/22/2016 0.50 INTRM1 PLUG RURD T Finish cleaning drip pan under rig 0.0 0.0 12:00 12:30 floor. 9/22/2016 9/22/2016 0.75 INTRM1 WHDBOP RURD T Rig up 5" test joint and pull wear ring. 0.0 0.0 12:30 13:15 Install test joint 9/22/2016 9/22/2016 0.75 INTRM1 WHDBOP RURD T Rig up test equipment and fill lines 0.0 0.0 13:15 14:00 with water. Bleed air out of lines. Monitor well on trip tank 9/22/2016 9/22/2016 4.50 INTRM1 WHDBOP BOPE T Test BOPE with 5" test joint. Test all 0.0 0.0 14:00 18:30 components to 250/3500 psi except for annular which was tested to 250/2500 psi. Tested accumulator, gas alarms, PVT alarms and super choke. Accumulator pressure = 2950 psi, manifold pressure = 1450 psi, Drawdown manifold pressure to 1300 psi. 200 psi increase in 20 sec. TSR = 145 seconds. 4 nitrogen bottles at 2300 psi. 9/22/2016 9/22/2016 0.50 INTRM1 WHDBOP RURD T Remove test joint and install wear ring 0.0 0.0 18:30 19:00 (I.D.=10") 9/22/2016 9/22/2016 2.75 INTRM1 PLUG BHAH T PJSM. Makeup sidetrack BHA 0.0 820.0 19:00 21:45 9/22/2016 9/22/2016 1.25 INTRM1 PLUG TRIP T RIH from 820' to 2515' 820.0 2,515.0 21:45 23:00 9/22/2016 9/22/2016 0.75 INTRM1 PLUG SRVY T Fill drillpipe and take quadedrant 2,515.0 2,515.0 23:00 23:45 surveys at 450 gpm, 1050 psi. 9/22/2016 9/23/2016 0.25 INTRM1 PLUG TRIP T POOH from 2515' to 2325' 2,515.0 2,325.0 23:45 00:00 9/23/2016 9/23/2016 1.00 INTRM1 PLUG SLPC T Hang blocks. Slip and cut 60' of drilling 2,325.0 2,325.0 00:00 01:00 line. 9/23/2016 9/23/2016 0.75 INTRM1 PLUG SVRG T Service top drive and drawworks. Re- 2,325.0 2,325.0 01:00 01:45 install SLB sensor above deadman. Calibrate block height. 9/23/2016 9/23/2016 8.00 INTRM1 PLUG TRIP T RIH with 5" DP from 2325'to 10,137'. 2,325.0 10,137.0 01:45 09:45 Fill pipe every 20 stds. Take MWD surveys. Started taking wt at 10,137'. 9/23/2016 9/23/2016 2.25 INTRM1 PLUG REAM T Break circulation. Stage pumps up to 10,137.0 10,213.0 09:45 12:00 425 gpm at 1710 psi. Ream hole from 10,137' to 10,213' while conditioning mud. ECD - 11.97/12.0 ppg. Page 23173 Report Printed: 12/1/2016 F w Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/23/2016 9/23/2016 4.75 INTRMI PLUG REAM T Continue washing and reaming from 10,213.0 10,529.0 12:00 16:45 10,213' to 10529'. Pump from 425 to 700 gpm at 1710 to 3630 psi. 60-150 rpm, Torque = 15k to 20.6 k 9/23/2016 9/23/2016 2.25 INTRM1 PLUG KOST T Attempt to side track from 10529' to 10,529.0 10,612.0 16:45 19:00 10612'. Observed increase in flo- show. 9/23/2016 9/23/2016 0.25 INTRM1 PLUG OWFF T Observe well for flow. Slight trickle. 10,612.0 10,612.0 19:00 19:15 Mud out of balance. No gas or pit gain. 9/23/2016 9/23/2016 0.75 INTRM1 PLUG KOST T Attempt to sidetrack from 10612' to 10,612.0 10,640.0 19:15 20:00 10776'. Observed flow -show increase from bottoms up. Observed well for 5 minutes -static. 9/23/2016 9/23/2016 2.50 INTRM1 PLUG KOST T Attempt to side track from 10640' to 10,640.0 1,076.0 20:00 22:30 10776'. 9/23/2016 9/23/2016 0.50 INTRM1 PLUG KOST T Trough from 10756'to 10776' with 700 10,776.0 10,776.0 22:30 23:00 gpm, 3900 psi, 140 rpm 9/23/2016 9/24/2016 1.00 INTRMI PLUG KOST T Time drill from 10776' to 10801' 10,776.0 10,801.0 23:00 00:00 9/24/2016 9/24/2016 1.50 INTRMI PLUG KOST T Wash and clean out soft cement from 10,801.0 10,896.0 00:00 01:30 10801' to 10896' attempting to sidetrack 9/24/2016 9/24/2016 2.25 INTRM1 PLUG KOST T Start troughing from 10896' to 10898'. 10,896.0 10,898.0 01:30 03:45 BHA hanging up. No transfer of weight to bit. 9/24/2016 9/24/2016 0.50 INTRMI PLUG JAR T Unable to pick up and topdrive stalling 10,898.0 10,898.0 03:45 04:15 out. Pick up single to work drillstring. Hit jars 1 time at 100kips over string weight and string free. 9/24/2016 9/24/2016 1.75 INTRM1 PLUG CIRC T Coirculate and reciprocate while 10,898.0 10,898.0 04:15 06:00 pumping sweep out of the hole. 9/24/2016 9/24/2016 6.00 INTRM1 PLUG BKRM T Back ream out of the hole from 10898' 10,898.0 9,865.0 06:00 12:00 to 9865' 9/24/2016 9/25/2016 12.00 INTRM1 PLUG BKRM T Continue back reaming out of hte hole 9,865.0 8,640.0 12:00 00:00 from 9865' to 8640' with 550 gpm, 2450 psi, 120 rpm. ROT = 160 kips, 16-18 k ft -lbs torque. ECD = 11.68 9/25/2016 9/25/2016 8.75 INTRMI PLUG BKRM T Continue back reaming out of hte hole 8,640.0 6,857.0 00:00 08:45 from 8640' to 6857' with 550 gpm, 2450 psi, 120 rpm. ROT = 160 kips, 16-18 k ft -lbs torque. ECD = 11.55 9/25/2016 9/25/2016 1.50 INTRM1 PLUG PMPO T Pump out of hole from 6857' to 6099' 6,857.0 6,099.0 08:45 10:15 at 7 bpm - 700 psi. Up wt - 170k. Dn wt - 120k. 9/25/2016 9/25/2016 0.75 INTRM1 PLUG BKRM T Tight hole at 6099'. Back ream out of 6,099.0 5,817.0 10:15 11:00 hte hole from 6099' to 5817' with 500 gpm, 2050 psi, 120 rpm. ROT = 140 kips, 10-12 k ft -lbs torque. ECD = 11.55 9/25/2016 9/25/2016 1.00 INTRM1 PLUG PMPO T Pump out of hole from 5817' to 5346' 5,817.0 5,346.0 11:00 12:00 at 7 bpm - 670 psi. Up wt - 175k. Dn wt - 115k. 9/25/2016 9/25/2016 0.50 INTRM1 PLUG PMPO T Pump out of hole from 5346' to 5066' 5,346.0 5,066.0 12:00 12:30 at 7 bpm - 680 psi. Tight spot at 5066'. Page 24/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 9/25/2016 9/25/2016 1.50 INTRM1 PLUG BKRM T Back ream out of hole from 5066' to 5,066.0 4,875.0 12:30 14:00 4875'. Stalled out at 5035'. Attemped to free pipe with bumber sub. No success. Used torgue and slump to free pipe. Continue backream out of hole to 4875' at 500 gpm - 680 psi. 9/25/2016 9/25/2016 0.50 INTRM1 PLUG PMPO T Pump out of hole from 4875' to 4710'. 4,875.0 4,710.0 14:00 14:30 Hole was tight and sticky. 9/25/2016 9/26/2016 9.50 INTRMI PLUG BKRM T Backream out of the hole from 4710' 4,710.0 2,548.0 14:30 00:00 to 2548' with 500 gpm, 1460 psi @ 120 rpm and 5.2 k -ft -lbs torque. 9/26/2016 9/26/2016 1.25 INTRMI PLUG PMPO T Pull BHA through csg shoe while 2,548.0 2,325.0 00:00 01:15 pumping 700 gpm - 2020 psi. Pull 15k over on Ist stab. Comfirmed that underreamer was not open. 9/26/2016 9/26/2016 0.50 INTRM1 PLUG CIRC T CBU at 700 gpm - 2020 psi - 120 rpms 2,325.0 2,325.0 01:15 01:45 4.5k tq. 9/26/2016 9/26/2016 0.25 INTRM1 PLUG OWFF T Flow check well. Static. 2,325.0 2,325.0 01:45 02:00 9/26/2016 9/26/2016 2.25 INTRM1 PLUG PMPO T Pump out of hole from 2325' to 820' at 2,325.0 820.0 02:00 04:15 7 bpm at 500 psi. 9/26/2016 9/26/2016 0.25 INTRMI PLUG OWFF T Flow check well for 10 min. Static. 820.0 820.0 04:15 04:30 PJSM for BHA. Line up trip tank. 9/26/2016 9/26/2016 0.50 INTRM1 PLUG TRIP T POH from 820' to 175' standing back 820.0 175.0 04:30 05:00 HWDP and jars. 9/26/2016 9/26/2016 2.00 INTRMI PLUG BHAH T POH. Inspect and clean BHA. No 175.0 0.0 05:00 07:00 damage observed. 9/26/2016 9/26/2016 0.50 INTRM1 PLUG BHAH T Clear and clean rig floor. 0.0 0.0 07:00 07:30 9/26/2016 9/26/2016 1.25 INTRM1 PLUG BOPE T Drain stack. Pull wear bushing. RU to 0.0 0.0 07:30 08:45 test BOP. 9/26/2016 9/26/2016 1.25 INTRM1 PLUG BOPE T Install 3 1/2" test jt. Test bag to 0.0 0.0 08:45 10:00 250/2500 psi. Test upper and lower pipe rams to 250/3500 psi. 9/26/2016 9/26/2016 0.50 INTRM1 PLUG BOPE T RD test equipment. Drain stack. Install 0.0 0.0 10:00 10:30 wear bushing. 9/26/2016 9/26/2016 0.75 INTRM1 PLUG RURD T RU to run 3 1/2" tbg. 0.0 0.0 10:30 11:15 9/26/2016 9/26/2016 2.75 INTRM1 PLUG PULD T Pick up 3-1/2" mleshoe and RIH with 3 0.0 950.0 11:15 14:00 -1/2" cement stinger to 950' 9/26/2016 9/26/2016 7.50 INTRM1 PLUG TRIP T RIH with cement stinger on 5" drillpipe 950.0 8,015.0 14:00 21:30 from 950' to 8015' 9/26/2016 9/26/2016 2.00 INTRM1 PLUG CIRC T Circulate bottoms up and condition 8,015.0 8,015.0 21:30 23:30 mud @ 8 bpm, 600 psi 9/26/2016 9/27/2016 0.50 INTRM1 PLUG CIRC T Spot 90 bbl hi-vis13.6 ppg pill at 8 8,015.0 8,015.0 23:30 00:00 bpm, 790 psi. 9/27/2016 9/27/2016 1.00 INTRM1 PLUG TRIP T POOH @ 800 ft/hr f/7,920' to 7,329' 7,920.0 7,329.0 00:00 01:00 9/27/2016 9/27/2016 0.25 INTRM1 PLUG RURD T B/D top drive. R/U head pin & cement 7,329.0 7,329.0 01:00 01:15 lines. 9/27/2016 9/27/2016 1.50 INTRM1 PLUG CIRC T Circ B/U w/8 bpm @ 840 psi. 7,329.0 7,329.0 01:15 02:45 Page 25/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/27/2016 9/27/2016 1.00 INTRM1 PLUG CMNT T Dowell pressure test lines to 2500 psi 7,329.0 7,329.0 02:45 03:45 (good). Pump 26.4 bbls 12.5 ppg mud push, 91.7 bbls 15.8 ppg 1.16 yld class G cement, 3.6 bbls 12.5 ppg mud push. Rig displace w/90 bbls 11.1 ppg LSND Initial 6 bpm @ 210 - 550 psi, Final 3 bpm @ 260 psi. 9/27/2016 9/27/2016 1.25 INTRMI PLUG TRIP T POOH @ 800 ft/hr f/7,329' to 6,513' 7,329.0 6,513.0 03:45 05:00 9/27/2016 9/27/2016 3.50 INTRM1 PLUG CIRC T Circ B/U w/650 gpm @ 1690 psi. 6,513.0 6,513.0 05:00 08:30 Pump foam ball and chase w/30 bbls water & circ surface to surface w/755 gpm @ 2060 psi. 9/27/2016 9/27/2016 2.00 INTRM1 PLUG PMPO T Pump OOH f/6,513' to 5,665' 6,513.0 5,665.0 08:30 10:30 9/27/2016 9/27/2016 1.50 INTRMI PLUG TRIP T RIH 9 stands breaking each 5,665.0 6,509.0 10:30 12:00 connection checking for cement rings f/5,665' to 6,509' 9/27/2016 9/27/2016 4.00 INTRM1 PLUG WOC T Circ & cond mud & W.O.C. to cure 6,509.0 6,509.0 12:00 16:00 w/630 - 400 gpm 1640 - 700 psi 9/27/2016 9/27/2016 0.50 INTRM1 PLUG WASH T Wash in hole w/1 - 2 bpm @ 140 psi & 6,509.0 6,607.0 16:00 16:30 tag T.O.0 @ 6,607' Cement plug tag witnessed by Johnny Hill of the AOGCC. 9/27/2016 9/27/2016 1.50 INTRMI PLUG CIRC T Circ B/U w/650 gpm @ 1580 psi. Rack 6,607.0 6,509.0 16:30 18:00 back 1 stand to 6,509' 9/27/2016 9/27/2016 0.25 INTRM1 PLUG OWFF T F/C (static) 6,509.0 6,509.0 18:00 18:15 9/27/2016 9/27/2016 3.00 INTRM1 PLUG TRIP T POOH f/6,509' to 3,337' 6,509.0 3,337.0 18:15 21:15 9/27/2016 9/27/2016 1.00 INTRM1 PLUG CIRC T Circ B/U w/400 gpm @ 560 psi. Spot 3,337.0 3,337.0 21:15 22:15 90 bbls high vis gel spacer. 9/27/2016 9/27/2016 1.00 INTRMI PLUG TRIP T POOH f/3,337' to 2,737' 3,337.0 2,737.0 22:15 23:15 9/27/2016 9/28/2016 0.75 INTRM1 PLUG CIRC T Circ & cond mud for cement job w/400 2,737.0 2,737.0 23:15 00:00 gpm @ 500 psi. 9/28/2016 9/28/2016 0.50 INTRM1 PLUG CIRC T Circ & cond mud for cement job w/400 2,737.0 2,737.0 00:00 00:30 gpm @ 500 psi. PJSM on cementing 9/28/2016 9/28/2016 0.25 INTRM1 PLUG RURD T B/D top drive. R/U cement lines. 2,737.0 2,737.0 00:30 00:45 9/28/2016 9/28/2016 0.75 INTRM1 PLUG CMNT T Dowell pressure test lines to 2500 psi 2,737.0 2,737.0 00:45 01:30 (good). Pump 24.7 bbls 12.5 ppg mud push, 85 bbls 17.0 ppg 1.0 yld class G cement, 5.3 bbls 12.5 ppg mud push. Rig displace w/15 bbls 11.1 ppg LSND w/3 bpm @ 250 psi. 9/28/2016 9/28/2016 1.50 INTRM1 PLUG TRIP T POOH f/2,739'to 1,890' 2,737.0 1,890.0 01:30 03:00 9/28/2016 9/28/2016 1.50 INTRM1 PLUG CIRC T Circ B/U w/700 gpm @ 960 psi 1,890.0 1,890.0 03:00 04:30 9/28/2016 9/28/2016 1.00 INTRM1 PLUG OTHR T Check 9 stands via mouse hole from 1,890.0 1,890.0 04:30 05:30 trip out for cement rings. Shuffle from DS to ODS 9/28/2016 9/28/2016 0.75 INTRM1 PLUG TRIP T POOH f/1,890'to 950' (tool joints 1,890.0 950.0 05:30 06:15 covered in caly) 9/28/2016 9/28/2016 1.75 INTRMI PLUG RURD T Attempt to POOH. Mud was thick & 950.0 950.0 06:15 08:00 not draining from tubing. R/U XO, safety valve & head pin. Page 26/73 Report Printed: 12/1/2076 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 9/28/2016 9/28/2016 0.50 INTRM1 PLUG CIRC T Circ thru tubing 100 bbls 950.0 950.0 08:00 08:30 9/28/2016 9/28/2016 1.50 INTRM1 PLUG PULD T POOH & L/D 30 jts 3 1/2" tubing (clay 950.0 0.0 08:30 10:00 & cement balled up around tool jts) 9/28/2016 9/28/2016 1.00 INTRM1 PLUG RURD T Clean & clear floor. FMC pull wear 0.0 0.0 10:00 11:00 ring. R/D 3 1/2" hande equipment. 9/28/2016 9/28/2016 0.50 INTRMI WHDBOP WWWH T M/U stack washer & flush stack. 0.0 0.0 11:00 11:30 9/28/2016 9/28/2016 1.00 INTRM1 WHDBOP RURD T R/U to test BOPE. Flood lines w/H20 0.0 0.0 11:30 12:30 9/28/2016 9/28/2016 5.00 INTRMI WHDBOP BOPE T BOPE Test: Test with 5" test joint, 0.0 0.0 12:30 17:30 Test Annular to 250/2,500 psi for 5 min, Test choke valves #1 - 14 and needle valve to 250/3,500 psi for 5 min. HCR Choke and Kill, 4" Demco, 5" FOSV, dart & needle valves, auto & manual IBOP, HCR choke & kill, 3 1/2" X 6" upper & lower VBR's, & blind rams to 250/3500 psi for 5 min. Koomey test; IP= 3,000 psi, press after close = 1,675 psi, 200 psi recovery 26 sec, full recovery 122 sec, N2- 4 bottle average= 2100 psi. Tested gas alarms. Draw down on man & super choke to 1,100 psi. - Test waived by Johnny Hill of the AOGCC. 9/28/2016 9/28/2016 1.00 INTRM1 WHDBOP RURD T R/D testing equipment. B/D lines. 0.0 0.0 17:30 18:30 FMC install wear ring (10" ID) 9/28/2016 9/28/2016 2.25 INTRMI PLUG SVRG T C/O saver sub on top drive. Service 0.0 0.0 18:30 20:45 top drive, draw works, & iron roughneck 9/28/2016 9/28/2016 0.50 INTRM1 PLUG TRIP T M/U mule shoe & RIH 3 stands HWDP 0.0 278.0 20:45 21:15 to 278' 9/28/2016 9/28/2016 1.25 INTRM1 PLUG SLPC T Slip & cut 45' drill line. Calibrate block 278.0 278.0 21:15 22:30 height. 9/28/2016 9/28/2016 1.00 INTRMI PLUG OTHR T Calibrate block height for MWD 278.0 278.0 22:30 23:30 9/28/2016 9/28/2016 0.25 INTRMI PLUG TRIP T POOH 3 stands HWDP f/278' 278.0 0.0 23:30 23:45 9/28/2016 9/29/2016 0.25 INTRMI PLUG BHAH T PJSM on BHA. P/U power drive & set 0.0 0.0 23:45 00:00 in rotary table. Prep BHA tools & equipment. 9/29/2016 9/29/2016 1.50 INTRM1 PLUG BHAH T M/U BHA #6 as per SLB 0.0 820.0 00:00 01:30 9/29/2016 9/29/2016 1.00 INTRMI PLUG TRIP T RIH f/820'to 1,761' 820.0 1,761.0 01:30 02:30 9/29/2016 9/29/2016 0.25 INTRM1 PLUG DHEQ T Shallow hole test MWD. 1,761.0 1,761.0 02:30 02:45 9/29/2016 9/29/2016 3.75 INTRM1 PLUG REAM T W&R f/1,761' to 2,523' looking for top 1,761.0 2,523.0 02:45 06:30 of cement w/675 gpm, 2000 psi, 30 rpm, 3 k trq. Tag top of cement @ 2,523' 9/29/2016 9/29/2016 1.25 INTRM1 PLUG KOST T Establish drilling parameters. Attempt 2,523.0 2,538.0 06:30 07:45 to side track f/2,523' to 2,538' (trouble with MWD detection) 9/29/2016 9/29/2016 2.75 INTRM1 PLUG DISP Trouble shoot MWD. Displace well to 2,538.0 2,538.0 07:45 10:30 IT I new 9.6 ppg LSND Page 27/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) ik CD5-99 0-2 .. Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 9/29/2016 9/29/2016 4.00 INTRM1 PLUG KOST T Attempt to get kicked off f/2,538' to 2,538.0 2,677.0 10:30 14:30 2,677' with no success. Various cement stringers. Tag up on what appears to be hard cement @ 2,677'. Decision made to pump second kick off plug. 9/29/2016 9/29/2016 1.00 INTRMI PLUG CIRC T Circ B/U w/650 gpm, 1670 psi, 30 2,677.0 2,609.0 14:30 15:30 rpm, 3.4 k trq. Pump 30 bbl nut plug sweep. 9/29/2016 9/29/2016 0.25 INTRM1 PLUG OWFF T F/C (static) 2,609.0 2,609.0 15:30 15.45 9/29/2016 9/29/2016 2.25 INTRM1 PLUG TRIP T POOH f/2,609' to 178' (rack back 2,609.0 178.0 15:45 18:00 HWDP &jars) 9/29/2016 9/29/2016 1.75 INTRM1 PLUG BHAH T L/D BHA as per SLB 178.0 0.0 18:00 19:45 9/29/2016 9/29/2016 0.75 INTRM1 PLUG BHAH T Clean & clear floor of BHA tools & 0.0 0.0 19:45 20:30 equipment. R/U 3 1/2" handling equipment 9/29/2016 9/29/2016 1.75 INTRM1 PLUG PULD T RIH while picking up 3 1/2" tubing 0.0 945.0 20:30 22:15 cement string 9/29/2016 9/29/2016 0.25 INTRM1 PLUG RURD T C/O handle equipment 945.0 945.0 22:15 22:30 9/29/2016 9/29/2016 1.00 INTRM1 PLUG TRIP T RIH with 5" DP f/945' to 2,548'. 945.0 2,548.0 22:30 23:30 9/29/2016 9/30/2016 0.50 INTRM1 PLUG TRIP T Wash in hole (/2,548' &TOC @ 2,683' 2,548.0 2,670.0 23:30 00:00 w/2 bpm @ 130 psi. L/D single joint to 2,670' 9/30/2016 9/30/2016 7.50 INTRMI PLUG CIRC T Circ & cond mud while wait on Dowell 2,670.0 2,670.0 00:00 07:30 cementers & cement lab results. 500 gpm, 330 psi 9/30/2016 9/30/2016 0.25 INTRM1 PLUG RURD T B/D top drive. R/U head pin and 2,670.0 2,670.0 07:30 07:45 cement lines 9/30/2016 9/30/2016 6.75 INTRM1 PLUG CIRC T Circ & cond mud while wait on Dowell 2,670.0 2,670.0 07:45 14:30 cementers & cement lab results. 400 gpm, 500 psi 9/30/2016 9/30/2016 1.50 INTRM1 PLUG CMNT T Dowell pressure test lines to 2200 psi 2,670.0 2,670.0 14:30 16:00 (good). Pump 24.8 bbls 12.5 ppg mud push, 119 bbls 17.0 ppg 1.0 yld class G neat cement, 5.2 bbls 12.5 ppg mud push w/4 bpm @ 140 - 120 psi. Rig displace w/20 bbls 9.6 ppg LSND, ICP 8 bpm @ 140 psi, FCP 4 pbm @ 80 psi. 9/30/2016 9/30/2016 1.00 INTRMI PLUG TRIP T POOH (/2,670' to 2,137'@ 800 ft/hr. 2,670.0 2,137.0 16:00 17:00 (DP on vac) 9/30/2016 9/30/2016 1.50 INTRM1 PLUG CIRC T Circ & cond mud w/650 - 500 gpm. 2,137.0 2,137.0 17:00 18:30 Observe mud push to surface. (No cement to surface). Drop foam wiper ball, chase w/30 bbls H2O and circ DP clean. 9/30/2016 9/30/2016 1.50 INTRM1 PLUG OTHR T F/C (static). Mouse hole 5 stands of 2,137.0 2,137.0 18:30 20:00 DP used for cementing. Break & inspect tool joints for cement. Rack back on ODS. 9/30/2016 9/30/2016 2.00 INTRM1 PLUG TRIP T POOH f/2,137' to 950' inspecting tool 2,137.0 950.0 20:00 22:00 joints for cement. 9/30/2016 9/30/2016 0.50 INTRM1 PLUG TRIP T PJSM on L/D tubing. R/U 3 1/2" 950.0 950.0 22:00 22:30 handling equipment. 9/30/2016 10/1/2016 1.50 INTRM1 PLUG PULD T POOH f/950'& L/D 3 1/2" cement 950.0 0.0 22:30 00:00 string. Page 28173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) s. CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/1/2016 10/1/2016 0.75 INTRM1 PLUG BHAH T Clean & clear floor of BHA tools & 0.0 0.0 00:00 00:45 equip. M/U 5" handling equip. 10/1/2016 10/1/2016 1.00 INTRM1 PLUG WWWH T M/U stack washer & flush stack. 0.0 0.0 00:45 01:45 10/1/2016 10/1/2016 0.50 INTRM1 PLUG RURD T B/D top drive. Drain BOPE. Flush kill 0.0 0.0 01:45 02:15 & choke lines. 10/1/2016 10/1/2016 1.75 INTRM1 PLUG BHAH T M/U kick off mud motor BHA #6 as per 0.0 68.0 02:15 04:00 SLB to 68' 10/1/2016 10/1/2016 1.00 INTRM1 PLUG TRIP T RIH f/68'to 1,931' 68.0 1,931.0 04:00 05:00 10/1/2016 10/1/2016 0.25 INTRM1 PLUG DHEQ T Shallow hole test MWD 1,931.0 1,931.0 05:00 05:15 10/1/2016 10/1/2016 0.50 INTRM1 PLUG REAM T W&R (/1,931' to 2,139'w/200 gpm, 1,931.0 2,139.0 05:15 05:45 280 psi, 30 rpm, 2.5 k trq. Rag top of cement @ 2,139' 10/1/2016 10/1/2016 4.00 INTRM1 PLUG DRLG T Drill cement f/2,139' to 2,340'w/450 2,139.0 2,340.0 05:45 09:45 gpm, 850 psi, 40 rpm, 3.7 k trq. 10/1/2016 10/1/2016 4.75 INTRM2 DRILL KOST T Drill kick off sidetrack & time drill 2,340.0 2,400.0 09:45 14:30 f/2,340' to 2,400'w/500 gpm, 920 psi, 40 rpm, 2 - 3 k trq, 20 ft/hr. P/U 125 k, SO 102 k, ROT 115 k. Seperation from old well bore confirmed. 10/1/2016 10/1/2016 1.00 INTRM2 DRILL CIRC T Circ B/U w/500 gpm, 920 psi, 20 rpm, 2,400.0 2,306.0 14:30 15:30 2.5 k trq. Rack back 1 stand f/2,400' to 2,306' 10/1/2016 10/1/2016 2.00 INTRM2 DRILL TRIP T F/C (static) POOF f/2,306' to 68' 2,306.0 68.0 15:30 17:30 10/1/2016 10/1/2016 1.00 INTRM2 DRILL BHAH T L/D BHA #6 as per SLB 68.0 0.0 17:30 18:30 10/1/2016 10/1/2016 0.50 INTRM2 DRILL BHAH T Clean & clear floor of BHA tools & 0.0 0.0 18:30 19:00 equip. 10/1/2016 10/1/2016 2.00 INTRM2 DRILL BHAH T M/U RSS BHA #7 to 821' 0.0 821.0 19:00 21:00 10/1/2016 10/1/2016 1.25 INTRM2 DRILL TRIP T R I H f/821' to 2,324' 821.0 2,324.0 21:00 22:15 10/1/2016 10/1/2016 0.25 INTRM2 DRILL DHEQ T Shallow hole test MWD tools 2,324.0 2,324.0 22:15 22:30 10/1/2016 10/1/2016 0.50 INTRM2 DRILL REAM T W&R f/2,324' to 2,400'w/600 gpm, 2,324.0 2,400.0 22:30 23:00 1570 psi, 60 rpm, 2 k trq 10/1/2016 10/2/2016 1.00 INTRM2 DRILL DDRL T Drill ahead f/2,400' to 2,481' MD'/ 2,400.0 2,481.0 23:00 00:00 2,160' TVD, ADT 1.04 hrs, ECD 10.20 ppg, 700 gpm, 2115 psi, PU wt 130 k, SO wt 115 k, ROT wt 125 k, 60 rpm, 3/6 k ft/lbs trq, 10/15 wob 10/2/2016 10/2/2016 0.25 INTRM2 DRILL DDRL T Drill ahead f/2,481' to 2,516' MD' 2,481.0 2,516.0 00:00 00:15 10/2/2016 10/2/2016 0.75 INTRM2 DRILL OTHR T Drop 1.25" ball to activate reamer. 2,516.0 2,516.0 00:15 01:00 Reamer shear @ 1400 psi. Open 11" hole f/2,357' Reamer closed 700 gpm, 2050 psi, 2968 TRPM Reamer opera 700 gpm, 1590 psi, 2343 TRPM 10/2/2016 10/2/2016 11.00 INTRM2 DRILL DDRL T Drill ahead f/2,516' to 4,120' MD'/ 2,516.0 4,120.0 01:00 12:00 3,078' TVD, ADT 7.25 hrs, ECD 11.13 ppg, 825 gpm, 2610 psi, PU wt 142 k, SO wt 111 k, ROT wt 124 k, 810 rpm, 5/10 k ft/lbs trq, 8/20 wob Page 29/73 Reporr Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 10/2/2016 10/3/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/4,120' to 6,120' MD' / 4,120.0 6,120.0 12:00 00:00 3,902' TVD, ADT 8.09 hrs, ECD 11.68 ppg, 825 gpm, 3170 psi, PU wt 165 k, SO wt 115 k, ROT wt 129 k, 180 rpm, 4/11 k ft/lbs trq, 10/28 wob 10/3/2016 10/3/2016 7.75 INTRM2 DRILL DDRL T Drill ahead f/6,120' to 7,510' MD'/ 6,120.0 7,510.0 00:00 07:45 4,482' TVD, , ECD 11.3 ppg, 825 gpm, 2937 psi, PU wt 170 k, SO wt 133 k, ROT wt 137 k, 180 rpm, 4/14 k ft/lbs trq, 10/28 wob 10/3/2016 10/3/2016 1.00 INTRM2 DRILL CIRC T Dehydrated mud discovered in Drill 7,510.0 7,510.0 07:45 08:45 pipe with slight cement contamination racked back on pipe rack. Clean out drill pipe and confirm no large cement pieces present. Phenolpthalein test confirmed mostly mud. 10/3/2016 10/3/2016 3.25 INTRM2 DRILL DDRL T Drill ahead (/7,510' to 8,121' MD'/ 7,510.0 8,121.0 08:45 12:00 4,724' TVD, ADT 8.07 hrs, ECD 11.4 ppg, 840 gpm, 3000 psi, PU wt 175 k, SO wt 140 k, ROT wt 150 k, 180 rpm, 5/15 k ft/lbs trq, 10/28 wob 10/3/2016 10/3/2016 0.50 INTRM2 DRILL DDRL T Drill ahead f/8,121'to 8,199' (Drag 8,121.0 8,199.0 12:00 12:30 chain broke) 10/3/2016 10/3/2016 1.00 INTRM2 DRILL RGRP T Repair drag chain wear plate. Circ 8,199.0 8,199.0 12:30 13:30 w/400 gpm, 940 psi, 120 rpm, 9.1 k trq, reciprocate pipe. 10/3/2016 10/3/2016 0.50 INTRM2 DRILL SVRG T Service rig. Grease draw works, wash 8,199.0 8,199.0 13:30 14:00 pipe & top drive 10/3/2016 10/4/2016 10.00 INTRM2 DRILL DDRL T Drill ahead f/8,199" to 9,673' MD'/ 8,199.0 9,673.0 14:00 00:00 5,362' TVD, ADT 7.30 hrs, ECD 11.15 ppg, 840 gpm, 3170 psi, PU wt 202 k, SO wt 137 k, ROT wt 167 k, 180 rpm, 11.5/20 k ft/lbs trq, 26/31 wob 10/4/2016 10/4/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/9,673' to 11,500' MD'/ 9,673.0 11,500.0 00:00 12:00 6,114' TVD, ADT 8.55 hrs, ECD 10.91 ppg, 840 gpm, 3170 psi, PU wt 235 k, SO wt 145 k, ROT wt 180 k, 180 rpm, 14/24 k ft/lbs trq, 30 wob 10/4/2016 10/5/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/11,500' to 13,052' MD'/ 11,500.0 13,052.0 12:00 00:00 6,748' TVD, ADT 8.42 hrs, ECD 11.25 ppg, 840 gpm, 3600 psi, PU wt 261 k, SO wt 146 k, ROT wt 189 k, 180 rpm, 15/24 k ft/lbs trq, 30 wob 10/5/2016 10/5/2016 1.00 INTRM2 DRILL DDRL T Drill ahead f/13,052'to 13,238' MD'/ 13,052.0 13,238.0 00:00 01:00 6,826' TVD, ADT .99 hrs, 10/5/2016 10/5/2016 4.00 INTRM2 DRILL CIRC T Pump up final survey. Pump nut plug 13,238.0 13,238.0 01:00 05:00 sweep. Circulate hole clean for 2 B/U & wt up to 10.1 ppg. Wt up f/10.1 ppg to 10.3 ppg over next circulation w/840 - 810 gpm, 3620 - 3680 psi, 180 - 150 rpm, 22 - 20 k trq 10/5/2016 10/5/2016 0.25 INTRM2 DRILL OWFF T F/C (static) 13,238.0 13,238.0 05:00 05:15 10/5/2016 10/5/2016 0.25 INTRM2 DRILL MPDA T Pull trip nipple & install RCD bearing. 13,238.0 13,238.0 05:15 05:30 10/5/2016 10/5/2016 0.75 INTRM2 DRILL MPDA T Establish circ. Break in RCD bearing 13,238.0 13,238.0 05:30 06:15 as per MPD. Calibrate chokes. SPR's Page 30/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/5/2016 10/5/2016 5.75 INTRM2 DRILL DDRL T Drill ahead f/13,238' to 13,792' MD'/ 13,238.0 13,792.0 06:15 12:00 7,054' TVD, ADT 3.54 hrs, ECD 11.74 ppg, 800 gpm, 3740 psi, PU wt 280 k, SO wt 140 k, ROT wt 194 k, 180 rpm, 18/31 k ft/lbs trq, 22/30 wob 10/5/2016 10/6/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/13,792' to 14,731' MD / 13,792.0 14,731.0 12:00 00:00 7,421' TVD, ADT 8.61 hrs, ECD 11.41 ppg, 815 gpm, 3920 psi, PU wt 310 k, SO wt 140 k, ROT wt 202 k, 180 rpm, 17.5/31 k ft/lbs trq, 27/34 wob 10/6/2016 10/6/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/14,731'to 15,477' MD / 14,731.0 15,477.0 00:00 12:00 7,544' TVD, ADT 8.98 hrs, ECD 11.42 ppg, 805 gpm, 3890 psi, PU wt 325 k, SO wt 140 k, ROT wt 203 k, 160 rpm, 22/35 k ft/lbs trq, 22 wob 10/6/2016 10/6/2016 1.75 INTRM2 DRILL DDRL T Drill ahead f/15,477'to TD of 15,582' 15,477.0 15,582.0 12:00 13:45 MD / 7,566' TVD, ADT 1.33 hrs, ECD 11.45 ppg, 805 gpm, 3850 psi, PU wt 325 k, SO wt 140 k, ROT wt 200 k, 160 rpm, 22/33.5 k ft/lbs trq, 20/25 wob 10/6/2016 10/7/2016 10.25 INTRM2 CASING CIRC T SPR's. Pump up final survey. Circ 8 15,582.0 15,582.0 13:45 00:00 B/U w/840 - 850 gpm, 3820 - 4060 psi, 150 - 180 rpm, 28 - 31 trq. (Perform 500 bbl dilution). After 6 th B/U pumped 30 bbl weighted nut plug sweep to aid in hole cleaning. 10/7/2016 10/7/2016 9.75 INTRM2 CASING CIRC T Circ 7+ B/U (16 total) w/850 - 840 15,582.0 15,582.0 00:00 09:45 gpm, 4050 - 3950 psi, 180 - 170 rpm, 26 - 22 trq. Wt up f/10.1 to 10.4 ppg. 10/7/2016 10/7/2016 1.25 INTRM2 CASING OTHR T Drop 1.625" ball to de -activate reamer. 15,582.0 15,582.0 09:45 11:00 Reamer open 700 gpm, 3370 psi, 2695 TRPM Reamer closed 700 gpm, 3410 psi, 3125 TRPM 10/7/2016 10/7/2016 4.25 INTRM2 CASING CIRC T Circulate & weight up f/10.4 ppg to 15,582.0 15,582.0 11:00 15:15 10.7 ppg w/750 - 660 gpm, 3670 - 3200 psi, 180 rpm 24 trq. (Observe decreasing pump pressure & TRPM) (Began seeing large clay cuttings on scalper deck, suspect wash-out stirred up cuttings) 10/7/2016 10/7/2016 0.25 INTRM2 CASING OTHR T Ramp down with MPD & check flow. 15,582.0 15,582.0 15:15 15:30 Fluid coming up thru drill string. Confirm washout in drill string. 10/7/2016 10/7/2016 3.00 INTRM2 CASING CIRC T Cont. to wt up to 11.0 ppg at reduced 15,582.0 15,582.0 15:30 18:30 flow rate of 300 gpm, 700 psi, 100 rpm 20 - 26 k trq. 10/7/2016 10/7/2016 0.50 INTRM2 CASING OWFF T F/C (static after 15 min) 15,582.0 15,582.0 18:30 19:00 10/7/2016 10/7/2016 0.50 INTRM2 CASING BKRM T Attempt to pump out of hole f/15,582' 15,582.0 15,488.0 19:00 19:30 to 15,488'w/2 bpm @ 200 psi. Tight hole and not able to work thru. BROPOH (/15,582' to 15,488'w/2 bpm @ 200 psi, 30 rpm 22 - 29 k trq. Page 31/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/7/2016 10/8/2016 4.50 INTRM2 CASING PMPO T Pump OOH f/15,488' to 13,982'w/2 - 15,488.0 13,982.0 19:30 00:00 3 bpm @ 200 - 300 psi. Work thru various tight spots w/30 rpm & 20 - 28 k trq @ 14,743, 14675, 14,573' 10/8/2016 10/8/2016 1.50 INTRM2 CASING PMPO T Pump OOH f/13,982' to 13,238'w/2 - 13,982.0 13,238.0 00:00 01:30 3 bpm @ 160 - 240 psi. Observe washout in stand #132, 27.8' down from top of stand. (WO positon was 2367' and to 2307' and while circulating and reciprocating on bottom) 10/8/2016 10/8/2016 0.25 INTRM2 CASING PULD T L/D washed out single jt & replace 13,238.0 13,238.0 01:30 01:45 with single from pipe shed. 10/8/2016 10/8/2016 4.50 INTRM2 CASING CIRC T Circulate & condition w/550 gpm, 2400 13,238.0 12,864.0 01:45 06:15 psi, 120 - 140 rpm, 20 k trq. Hole un- loaded clay. Pumped 30 bbl nut plug sweep to aid in hole cleaning. Rack back stands each hour f/13,238' to 12,864' 10/8/2016 10/8/2016 0.25 INTRM2 CASING OWFF T F/C (static after 10 min) 12,864.0 12,864.0 06:15 06:30 10/8/2016 10/8/2016 2.25 INTRM2 CASING SMPD T Line up MPD & Strip OOH (/12,864' to 12,864.0 11,033.0 06:30 08:45 11,033'. Worked thru various tight spots. Not able to work past 11,033' 10/8/2016 10/8/2016 0.25 INTRM2 CASING TRIP T RIH 1 stand f/11,033'to 11,178' 11,033.0 11,178.0 08:45 09:00 10/8/2016 10/8/2016 1.75 INTRM2 CASING CIRC T Circulate hole clean f/11,178'to 11,178.0 10,989.0 09:00 10:45 10,989'. 10/8/2016 10/8/2016 1.75 INTRM2 CASING SMPD T Line up MPD & Strip OOH f/10,989' to 10,989.0 9,365.0 10:45 12:30 9,365'. Worked thru various tight spots. Not able to work past 9,365 10/8/2016 10/8/2016 2.00 INTRM2 CASING CIRC T Circulate hole clean (/9,365' to 9,297' 9,365.0 9,297.0 12:30 14:30 10/8/2016 10/8/2016 0.50 INTRM2 CASING SMPD T Line up MPD & attempt to Strip OOH. 9,297.0 9,297.0 14:30 15:00 No Success. 10/8/2016 10/8/2016 5.00 INTRM2 CASING BKRM T BROOH f/9,297' to 8,356'w/550 - 600 9,297.0 8,356.0 15:00 20:00 gpm, 2200 - 2400 psi, 140 rpm 12 - 18 k trq. Mainating ECD's <12.0 ppg. MPD ramp on connections 10/8/2016 10/8/2016 1.50 INTRM2 CASING CIRC T Circulate hole clean for 1.5 B/U 8,356.0 8,261.0 20:00 21:30 f/8,356' to 8,261' 10/8/2016 10/8/2016 0.25 INTRM2 CASING OWFF T F/C (static after 13 min) 8,261.0 8,261.0 21:30 21:45 10/8/2016 10/8/2016 0.25 INTRM2 CASING SMPD T Line up MPD & attempt to Strip OOH. 8,261.0 8,261.0 21:45 22:00 No Success. P/U wt 225 k, SO wt 125 k, Max overpull 50 k @ 275 k 10/8/2016 10/9/2016 2.00 INTRM2 CASING BKRM T BROOH f/8,261' to 7,794'w/600 660 8,261.0 7,794.0 22:00 00:00 gpm, 2380 - 2740psi, 140 rpm 13 - 21 k trq. Mainating ECD's <12.0 ppg. MPD ramp on connections 10/9/2016 10/9/2016 8.50 INTRM2 CASING BKRM T BROOH f/7,794' to 6,382' w/650 - 730 7,794.0 6,382.0 00:00 08:30 gpm, 2480 - 2890 psi, 140 - 180 rpm 8 - 10 k trq. Mainating ECD's <12.0 ppg. MPD ramp on connections. Various tight spots (7,694, 7,256, 6,864, 6,770, 6,717) 10/9/2016 10/9/2016 0.75 INTRM2 CASING CIRC T Circ 1.3 B/U w/730 gpm, 2800 psi, 180 6,382.0 6,382.0 08:30 09:15 rpm, 10 - 9 k trq 10/9/2016 10/9/2016 0.50 INTRM2 CASING OWFF T F/C (static) PJSM - Pull RCD bearing 6,382.0 6,382.0 09:15 09:45 Page 32/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) rM r' is CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (WB) End Depth (WB) 10/9/2016 10/9/2016 0.50 INTRM2 CASING MPDA T Pull RCD bearing & install trip nipple 6,382.0 6,382.0 09:45 10:15 10/9/2016 10/9/2016 12.25 INTRM2 CASING BKRM T BROOH f/ 6,382' to 2,326 w/730 gpm, 6,382.0 2,326.0 10:15 22:30 2550 - 2890 psi, 180 - 140 rpm 10 - 4 k trq. Mainating ECD's <12.0 ppg. Pulled slow w/ 30 rpm across shoe & pumped nut plug sweeps to aid in cleaning . 10/9/2016 10/9/2016 0.75 INTRM2 CASING CIRC T Pump nut plug sweep & circ casing 2,326.0 2,326.0 22:30 23:15 clean w/730 gpm, 2600 psi, 80 rpm, 2600 psi. Hole un -loaded huge amounts of clay. Large clay balls the size of hockey pucks & soft balls 10/9/2016 10/9/2016 0.25 INTRM2 CASING OWFF T F/C (static) - SIMOPS C/O mud pump 2,326.0 2,326.0 23:15 23:30 #1 & #2 suction screens. 10/9/2016 10/10/2016 0.50 INTRM2 CASING BKRM T BROOH f/ 2,326' to 2,138 w/730 gpm, 2,326.0 2,138.0 23:30 00:00 2500 psi, 80 rpm 3 - 4 k trq. Pumped nut plug sweep to aid in hole cleaning. 10/10/2016 10/10/2016 3.00 INTRM2 CASING BKRM T BROOH f/2,138 w/730 gpm, 2400 psi, 2,138.0 1,478.0 00:00 03:00 120 rpm 3 k trq. Pumped nut plug sweep to aid in hole cleaning. Hole un -loading large amounts of clay patties. 10/10/2016 10/10/2016 0.25 INTRM2 CASING OWFF T F/C (static) 1,478.0 1,478.0 03:00 03:15 10/10/2016 10/10/2016 3.25 INTRM2 CASING PMPO T Attempt to POOH on elevators. 1,478.0 179.0 03:15 06:30 (Swabbing). Pump OOH f/1,478' to 179' 10/10/2016 10/10/2016 0.25 INTRM2 CASING OWFF T F/C (static) 179.0 179.0 06:30 06:45 10/10/2016 10/10/2016 1.75 INTRM2 CASING BHAH T LID BHA #7 as per SLB 179.0 0.0 06:45 08:30 10/10/2016 10/10/2016 0.25 INTRM2 CASING BHAH T Clean & clear floor 0.0 0.0 08:30 08:45 10/10/2016 10/10/2016 0.25 INTRM2 CASING WWWH T R/U srack washer & wash stack w/10 0.0 0.0 08:45 09:00 bpm @ 130 psi. 10/10/2016 10/10/2016 1.50 INTRM2 CASING BOPE P PJSM, Drain stack. Pull wear ring. 0.0 0.0 09:00 10:30 C/O upper rams from 3'/i' x 6" VBR to 7-5/8" solid body. 10/10/2016 10/10/2016 1.00 INTRM2 WHDBOP RURD P R/U to test BOPE. Fill lines with H2O 0.0 0.0 10:30 11:30 10/10/2016 10/10/2016 5.00 INTRM2 WHDBOP BOPE P BOPE Test: Test with 5" & 7 5/8" test 0.0 0.0 11:30 16:30 joint, Test Annular to 250/2,500 psi for 5 min, Test choke valves #1 - 14 and needle valve to 250/3,500 psi for 5 min. HCR Choke and Kill, 4" Demco, 5" FOSV, dart & needle valves, auto & manual IBOP, HCR choke & kill, 7 5/8" casing rams, 3 1/2" X 6" lower VBR's, & blind rams to 250/3500 psi for 5 min. Koomey test; IP= 3,000 psi, press after close = 1,600 psi, 200 psi recovery 26 sec, full recovery 129 sec, N2- 4 bottle average= 2075 psi. Tested gas alarms. Draw down on man & super choke to 1,100 psi. - Test waived by Jeff Jones of the AOGCC. 10/10/2016 0.75 INTRM2 WHDBOP RURD P RID testing equipment. B/D choke & 0.0 0.0 110/10/2016 16:30 17:15 1 1 kill lines. Set 10.25" ID wear ring. Page 33/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) A. ..;, CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (W) End Depth (ftKB) 10/10/2016 10/10/2016 1.50 INTRM2 CASING RURD P R/U to run casing. R/U Volant, bale 0.0 0.0 17:15 18:45 extensions, 7 5/8" elevators & spiders. 10/10/2016 10/11/2016 5.25 INTRM2 CASING PUTB P PJSM. Make up shoe track & RIH w/7 0.0 1,325.0 18:45 00:00 5/8", 29.7 #, L-80, BTC -M casing as per tally to 1,325' (31 joints in the hole) Check floats on jt #5 (good) 10/11/2016 10/11/2016 10.00 INTRM2 CASING PUTB P Continue picking up and running 7- 1,325.0 6,699.0 00:00 10:00 5/8" 29.7# L-80 BTCM casing per running order from 1,325' MD to 6,699' MD. P/U=180k, S/0=140k. 10/11/2016 10/11/2016 1.75 INTRM2 CASING CIRC P Establish circulation and stage pumps 6,699.0 6,699.0 10:00 11:45 up from 1 bpm 228 psi, to 8 bpm 320 psi. CBU, heaviest mud 11.2 ppg out, 11.0 ppg in. 10/11/2016 10/11/2016 10.50 INTRM2 CASING PUTB P Continue picking up and running 7- 6,699.0 10,975.0 11:45 22:15 5/8" 29.7# L-80 BTCM casing per running order from 6,699' MD to 10,975' MD, joint #273. P/U=255k, S/0=155k. 10/11/2016 10/12/2016 1.75 INTRM2 CASING CIRC P Establish circulation to CBU @ 10,975.0 10,975.0 22:15 00:00 10,975' MD, above the Albian 96. Stage up from 1 bpm to 5 bpm 480 psi, pumped '/2 bottoms up @ 00:00 hrs. Heaviest mud out 11.5 ppg, 11.0 ppg in. 10/12/2016 10/12/2016 1.25 INTRM2 CASING CIRC P Continue to CBU @ 10,975' MD, 10,975.0 10,975.0 00:00 01:15 above the Albian 96. Stage up from 5 to 7 bpm 520-480 psi. Heaviest mud out 11.5 ppg, 11.0 ppg in. 10/12/2016 10/12/2016 9.00 INTRM2 CASING PUTB P Continue picking up and running 7- 10,975.0 13,808.0 01:15 10:15 5/8" 29.7# L-80 BTCM, XO to H563 casing per running order from 10,975' MD to 13,808' MD, joint #343. P/U=315k, S/0=160k. ( Had 50k bobble @ 13,668' MD, sticky out of slips after connection) 10/12/2016 10/12/2016 1.75 INTRM2 CASING CIRC P Circulate and condition @ 13,808' MD, 13,808.0 13,808.0 10:15 12:00 above the HRZ. Stage up from .5 to 5.5 bpm 510-640 psi. P/1 -1=315k, S/O=160k, 420k to break over. 10/12/2016 10/12/2016 2.75 INTRM2 CASING CIRC P Continue to circulate and condition @ 13,808.0 13,808.0 12:00 14:45 13,808' MD, above the HRZ. Stage up from 5.5 to 8 bpm 460 psi. Heaviest mud out 11.7+ ppg briefly then dropped off to 11.0+. P/U=315k, S/0=160k with pumps on. 10/12/2016 10/13/2016 9.25 INTRM2 CASING PUTB P Continue picking up and running 7- 13,808.0 15,392.0 14:45 00:00 5/8" 29.7# L-80 H563 casing per running order from 13,808' MD to 15,392' MD. S/0=105k. Started taking weight at 14,465' MD, to block weight (60k) at times. Continued RIH slowly, improved at 15,100' MD to S/0 of —105k. Page 34173 Report Printed: 12/1/2016 A_M S Operations Summary (with Timelog Depths) CD5-99 �.. i • t. Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/13/2016 10/13/2016 1.25 INTRM2 CASING PUTB P Continue RIH with 7-5/8" Hyd563 15,392.0 15,570.0 00:00 01:15 29.7# L-80 casing from 15,392', M/U hanger and landing joint, land on hanger @ 15,570.58' MD. Calc Disp=177.56 bbl, Actual Disp=124 bbl. S/0=130k, P/U= N/A. SIMOPS verify pipe count and empty pipe shed. 10/13/2016 10/13/2016 0.50 INTRM2 CEMENT CIRC P Establish circulation @ .5 bpm, 510 15,570.0 15,570.0 01:15 01:45 psi. SIMOPS- Load pipe shed with 4" DP. 10/13/2016 10/13/2016 0.50 INTRM2 CEMENT HOSO P Shut down pumps, drain stack to 15,570.0 15,570.0 01:45 02:15 verify hanger is landed, good per FMC. 10/13/2016 10/13/2016 5.00 INTRM2 CEMENT CIRC P Circulate and condition mud for 15,570.0 15,570.0 02:15 07:15 cement, .5 bpm to 8 bpm, 480-535 psi. Attempt to reciprocate pipe, P/U from 450k -490k max, no go. 10/13/2016 10/13/2016 0.25 INTRM2 CEMENT RURD P Shut down pumps, blow down top 15,570.0 15,570.0 07:15 07:30 drive. R/U cement lines. 10/13/2016 10/13/2016 1.50 INTRM2 CEMENT CIRC P Continue circulate and condition @ 8 15,570.0 15,570.0 07:30 09:00 bpm, 830 psi. SI MOPS- PJSM on cement job. 10/13/2016 10/13/2016 3.00 INTRM2 CEMENT CMNT P Flood lines with water, test lines to 15,570.0 15,570.0 09:00 12:00 3800 psi. SLB pumped 41 bbl of 12.5 ppg Mud Push II. Drop bottom plug. SLB pumped 154.5 bbl of 15.8 ppg cement. Drop top plug. SLB kick out with 20 bbl water, rig displaced with 6892 strokes to bump plug (694 bbl). CIP @ 11:50 hrs, no losses. 10/13/2016 10/13/2016 1.25 INTRM2 CEMENT CIRC P Open stage collar with 3150 psi, 15,570.0 15,570.0 12:00 13:15 establish circulation to 8 bpm, 520-530 psi. SIMOPS- PJSM on 2nd stage cement. 10/13/2016 10/13/2016 1.75 INTRM2 CEMENT CMNT P Peform 2nd stage cement job. Flood 15,570.0 15,570.0 13:15 15:00 cement lines, pressure test to 3000 psi. SLB pumped 42 bbl 12.5 ppg MudPush II, 65 bbl 15.8 ppg cement. Drop closing plug. SLB kick out with 20.2 bbl water, rig displaced with 2867 stks (288 bbl). Bumped plug and pressure up to 1900 psi, held 5 minutes. Bleed pressure and check floats - good. CIP @ 14:34 hrs. 10/13/2016 10/13/2016 0.75 INTRM2 CEMENT RURD P Blow down cement line, rig down and 15,570.0 0.0 15:00 15:45 lay down Volant CRT, lay down landing joint. 10/13/2016 10/13/2016 0.50 INTRM2 CEMENT RURD P Pick up test joint and M/U retrieval 0.0 0.0 15:45 16:15 tool. Pull wear ring. 10/13/2016 10/13/2016 1.00 INTRM2 CEMENT WWSP P Set and test 7-5/8" packoff to 5000 psi 0.0 0.0 16:15 17:15 for 10 minutes witnessed by CPAI rep, good. 10/13/2016 10/13/2016 0.25 INTRM2 CEMENT RURD P Lay down test joint, install 5" 0.0 0.0 17:15 17:30 elevators. Grease iron roughneck and draw works. Page 35173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/13/2016 10/14/2016 6.50 INTRM2 CEMENT PULD P Lay down 5" DP from derrick via 0.0 0.0 17:30 00:00 mouse hole. SIMOPS - Replace mud lines in pits, C/O upper rams from 7-5/8" to 3'/z' x 6" VBR. 10/14/2016 10/14/2016 10.00 INTRM2 CEMENT PULD P Lay down 5" drill pipe via mousehole 0.0 0.0 00:00 10:00 (94 stands DP and 7 stands HWDP) SIMOPS- Welding in pit room, replacing overhead mud lines. SIMOPS- Perform annular LOT on CD5-99A, 15.1 pg EMW. Flush outer annulus with 300 bbl water and freeze protect with 85 bbl diesel. 10/14/2016 10/14/2016 1.75 INTRM2 CEMENT RURD P Change out saver sub from DS50 to 0.0 0.0 10:00 11:45 XT39. SIMOPS- change out handling equipment to 4". OA pressure @ 11:45 hrs= 50 psi 10/14/2016 10/14/2016 0.25 INTRM2 CEMENT BOPE P Set test plug with 4" test joint. 0.0 0.0 11:45 12:00 SIMOPS - Take 7-5/8" rams out of cellar. 10/14/2016 10/14/2016 0.50 INTRM2 CEMENT BOPE P Fill lines, rig up to test rams and 0.0 0.0 12:00 12:30 annular with 4" test joint, 4" valves. 10/14/2016 10/14/2016 0.75 INTRM2 CEMENT BOPE P With 4" test joint, tested annular, HCR 0.0 0.0 12:30 13:15 kill and choke to 250/2500 psi 5 min ea. Test upper pipe rams, HCR kill and choke, 4" Dart valve, lower pipe rams and TIW valve to 250/3500 psi, 5 min each. 10/14/2016 10/14/2016 1.00 INTRM2 CEMENT BOPE P Drain stack, rig down test equipment. 0.0 0.0 13:15 14:15 Set 7.1875" ID wear ring per FMC rep. SIMOPS- Bring up MPD bearings and BHA tools. 10/14/2016 10/14/2016 1.75 INTRM2 CEMENT BHAH P PJSM and M/U BHA #8 (61X" 0.0 339.0 14:15 16:00 Production Periscope/ Powerdrive) per DD/MWD reps to 339' MD. 10/14/2016 10/14/2016 1.75 INTRM2 CEMENT PULD P Single in hole from pipe shed on 4" DP 339.0 1,759.0 16:00 17:45 from 339' MD to 1,759' MD. 10/14/2016 10/14/2016 0.50 INTRM2 CEMENT DHEQ P Fill pipe and shallow test MWD @ 220 1,759.0 1,759.0 17:45 18:15 gpm, 1200 psi - good. SIMOPS- PJSM on cut / slip drilling line. 10/14/2016 10/14/2016 1.25 INTRM2 CEMENT SLPC P Slip and cut 97.5' drilling line. Re- 1,759.0 1,759.0 18:15 19:30 calibrate block height Totco and SLB. 10/14/2016 10/14/2016 0.50 INTRM2 CEMENT SVRG P Service top drive, draw works and iron 1,759.0 1,759.0 19:30 20:00 roughneck. 10/14/2016 10/15/2016 4.00 INTRM2 CEMENT PULD P Single in hole from pipe shed on 4" DP 1,759.0 5,548.0 20:00 00:00 from 1759' MD to 5,548' MD, fill pipe every 20 stands. P/U=120k, S/O=100k @ 5,548' MD. OA pressure @ 22:00 hrs= 60 psi. 10/15/2016 10/15/2016 1.25 INTRM2 CEMENT PULD P Continue singling in hole, 4" DP BHA 5,548.0 6,495.0 00:00 01:15 # 8 from 5,548' MD to 6,495' MD filling pipe every 20 stands. Page 36/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) to CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/15/2016 10/15/2016 2.00 INTRM2 CEMENT DRLG P Establish circulation, wash down from 6,495.0 6,711.0 01:15 03:15 6,495' MD @ 220-230 gpm, 1650- 1730 psi, 40-60 rpm, 3-4.5k Tq. Tag stage collar closing plug on depth @ 6,707' MD. Drill plug and stage collar with 5-8k WOB, 120 gpm, 650 psi, 30 rpm, 7.5k Tq. Drill out of stage collar @ 6,711' MD. P/U=130k, S/O=100k, ROT= 115k. 10/15/2016 10/15/2016 1.25 INTRM2 CEMENT REAM P Precautionary wash and ream down 6,711.0 7,063.0 03:15 04:30 below stage collar from 6,711' MD to 7,063' MD, 220 gpm, 1660 psi, 80 rpm, 5.5k TQ. 10/15/2016 10/15/2016 2.25 INTRM2 CEMENT PULD P Continue singling in hole, 4" DP BHA 7,063.0 8,956.0 04:30 06:45 # 8 from 7,063' MD to 8,956' MD filling pipe every 20 stands. P/U=165k, S/O=100k. 10/15/2016 10/15/2016 1.25 INTRM2 CEMENT QEVL P Log with Sonicscope 900 fph from 8,956.0 9,048.0 06:45 08:00 8,956' MD to 9,048' MD for free ring signature with no cement behind pipe. 10/15/2016 10/15/2016 3.50 INTRM2 CEMENT PULD P Continue singling in hole, 4" DP BHA 9,048.0 12,179.0 08:00 11:30 # 8 from 9,048' MD to 12,179' MD filling pipe every 20 stands. P/U=190k, S/0=100k. OA pressure @ 10:45 hrs= 530 psi 10/15/2016 10/15/2016 0.50 INTRM2 CEMENT QEVL P Downlink to activate Sonicscope, 230 12,179.0 12,179.0 11:30 12:00 gpm, 2250 psi. 10/15/2016 10/15/2016 3.75 INTRM2 CEMENT QEVL P Cement bond log with Sonicscope @ 12,179.0 13,968.0 12:00 15:45 900 fph from 12,179' MD to 13,968' MD recorded mode. 10/15/2016 10/15/2016 1.25 INTRM2 CEMENT QEVL P Real time log with Impulse Gamma @ 13,968.0 14,121.0 15:45 17:00 250 fph to depth correlate formation HRZ from 13,968' MD to 14,121' MD. 230 gpm, 2260 psi. Log picked up marker 9' deep from drilling log. (No rotation) Continue recording Sonicscope CBL data. 10/15/2016 10/15/2016 0.75 INTRM2 CEMENT QEVL P Cement bond log with Sonicscope @ 14,121.0 14,352.0 17:00 17:45 900 fph from 14121' MD to 14,352' MD recorded mode. 10/15/2016 10/15/2016 1.00 INTRM2 CEMENT QEVL P Real time log with Impulse Gamma @ 14,352.0 14,446.0 17:45 18:45 250 fph to depth correlate formation Kuparuk C from 14,352' MD to 14,446' MD. 230 gpm, 2370 psi. Log picked up marker 13' deep with no rotation. P/U and repeat log with 60 rpm and picked up marker 9' deep from drilling log. Continue recording Sonicscope CBL data. 10/15/2016 10/15/2016 0.75 INTRM2 CEMENT QEVL P Cement bond log with Sonicscope @ 14,446.0 14,827.0 18:45 19:30 900 fph from 14,446' MD to 14,827' MD recorded mode. Page 37/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/15/2016 10/15/2016 1.75 INTRM2 CEMENT DLOG P Real time log with Impulse Gamma @ 14,827.0 14,957.0 19:30 21:15 250 fph to locate RA tag from 14,827' MD to 14,957' MD. 230 gpm, 2370 psi. Gap in MWD data missed tag on first run. P/U and repeat log, Periscope picked up tag (427 gAPI) @ 14,936' bit depth, Impulse picked up tag (362 gAPI) at 14,957.88' bit depth. Tool offsets places RA tag @ 14,896.85' drill pipe measurement. Casing tally places RA tag at 14,898.56'. 1.71' difference with no rotation. Continue recording Sonicscope CBL data. 10/15/2016 10/15/2016 1.25 INTRM2 CEMENT COCF P Wash down from 14,957' MD to 14,957.0 15,389.0 21:15 22:30 15,389' MD, 230 gpm, 2390 psi. Tag cement @ 15,389' MD. OA pressure @ 22:00 hrs= 560 psi 10/15/2016 10/15/2016 0.50 INTRM2 CEMENT DRLG P Drill cement from 15,389' MD to 15,389.0 15,395.0 22:30 23:00 15,395' MD', 230 gpm 2390 psi, 60 rpm 17.4k Tq. P/U=250k, S/0=100k, ROT=155k. 10/15/2016 10/15/2016 0.25 INTRM2 CEMENT BKRM P Backream stand out of hole from 15,395.0 15,304.0 23:00 23:15 15,395' MD to 15,304' MD, rack back in derrick. 10/15/2016 10/15/2016 0.50 INTRM2 CEMENT RURD P Blow down top drive, rig up equipment 15,304.0 15,304.0 23:15 23:45 for casing test. 10/15/2016 10/16/2016 0.25 INTRM2 CEMENT PRTS P Begin pressure test casing to 3500 psi 15,304.0 15,304.0 23:45 00:00 for 30 minutes. 10/16/2016 10/16/2016 0.25 INTRM2 CEMENT PRTS P Complete casing test to 3500 psi for 15,304.0 15,304.0 00:00 00:15 30 minutes charted. 10/16/2016 10/16/2016 0.50 INTRM2 CEMENT RURD P Bleed off pressure and rig down 15,304.0 15,304.0 00:15 00:45 testing equipment. 10/16/2016 10/16/2016 0.75 INTRM2 CEMENT COCF P Wash and ream down from 15,304' 15,304.0 15,396.0 00:45 01:30 MD to 15,396' MD 230 gpm, 2600 psi, 60 rpm, 17.5k Tq. SIMOPS- PJSM on displacing to MOBM. 10/16/2016 10/16/2016 2.00 INTRM2 CEMENT DISP P Displace well from 11.0 ppg LSND to 15,396.0 15,396.0 01:30 03:30 9.5 ppg MOBM. Pumped 40 bbl Safe Surf spacer with both pumps, followed by 75 bbl HV MOBM from pit 5, dropped riser and completed displacement, 640 bbl MOBM from active system. Displaced at 230 gpm until 9.5 ppg out bit, then increase to 265 gpm, 3130 psi, 60-80 rpm, 17.5k initial torque, 8.5k final torque. (No Lube 776 in MOBM) 10/16/2016 10/16/2016 0.25 INTRM2 CEMENT RURD P Clean shakers, shaker trays and 15,396.0 15,396.0 03:30 03:45 troughs of residual WBM. GIS prepare for recieving CBM cuttings. 10/16/2016 10/16/2016 2.50 INTRM2 CEMENT DRLG P Drill out baffle collar, float collar, shoe 15,396.0 15,582.0 03:45 06:15 track, shoe and rathole from 15,396' MD to 15,582' MD. 230-250 gpm, 2440-2870 psi, 40-60 rpm, 11-11.5k Tq, 5-15k WOB. 10/16/2016 10/16/2016 0.50 INTRM2 CEMENT DDRL P Drill 20' new formation to 15,602' MD, 15,582.0 15,602.0 06:15 06:45 250 gpm, 2980 psi, 60 rpm, 10k Tq, 15k WOB. Page 38173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/16/2016 10/16/2016 2.00 INTRM2 CEMENT CIRC P Circulate and condition for FIT, 250 15,602.0 15,602.0 06:45 08:45 gpm, 2980 psi, 60 rpm, 10k Tq. 10/16/2016 10/16/2016 0.50 INTRM2 CEMENT PMPO P Pump out to 15,559' MD for FIT, 170 15,602.0 15,559.0 08:45 09:15 gpm, 1600 psi. P/U=225k, S/0=125k. Flow check static. 10/16/2016 10/16/2016 0.75 INTRM2 CEMENT FIT P R/U and perform FIT to 12.5 ppg 15,559.0 15,559.0 09:15 10:00 EMW. 1190 psi applied with 9.5 ppg OBM @ 7,569' TVD. Rig down test equipment. 10/16/2016 10/16/2016 0.50 PROD1 DRILL MPDA P Pull trip nipple and install MPD 15,559.0 15,559.0 10:00 10:30 bearing. 10/16/2016 10/16/2016 1.00 PROD1 DRILL REAM P Wash and ream down from 15,559' 15,559.0 15,602.0 10:30 11:30 MD to 15,602' MD 270 gpm, 3290 psi. Break in MPD bearing @ 50 rpm and 100 rpm 2 min ea. OA pressure @ 10:30 hrs= 510 psi. 10/16/2016 10/16/2016 0.50 PROD1 DRILL DDRL P Directional drill 63/4" production hole 15,602.0 15,639.0 11:30 12:00 from 15,602' MD to 15,639' MD, 270 gpm 3410 psi, 60 rpm, 13.5k Tq, 15k WOB. ADT=.56 10/16/2016 10/17/2016 12.00 PROD1 DRILL DDRL P Directional drill 6%" production hole 15,639.0 16,684.0 12:00 00:00 from 15,639' MD to 16,684' MD, 270 gpm 3610 psi, 150 rpm, 12.5k Tq, 5- 10k WOB. ADT= 8.61. ECD=11.0 ppg @ 230 fph, reduce ROP to 100 then 50 to achieve turn, ECD reduced to 10.77 ppg EMW. Entered Alpine A target @ 16,053' MD. Pump anti -jamming sweep at 16,462' MD, HV CBM with 8 ppb G -Seal, followed by 20 bbl LV OBM. OA pressure @ 22:00 hrs=540 psi. 10/17/2016 10/17/2016 11.25 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 16,684.0 17,873.0 00:00 11:15 16,684' MD to 17,873' MD, 7,604' TVD, ADT=8.31 hrs, Jar Hrs=34.91. 275 gpm, 3800 psi, ECD=10.9-11.0 ppg EMW, 160 rpm 14.5k Tq, 10-15k WOB. P/U=245k, S/0=105k, ROT=160k. Pumped anti -jamming sweep @ 17,070' MD. OA pressure @ 12:00 hrs=550 psi 10/17/2016 10/17/2016 4.75 PROD1 DRILL DHEQ T Circulating 280-290 gpm, 3640-4100 17,873.0 17,873.0 11:15 16:00 psi. Troubleshoot SLB tools due inability to successfully send downlink. Checked pulsation dampeners, attempted both pumps individually and together, SLB attempted different downlink rates, check for air/gas in mud -none. Changed from 18 sec downlink to 32 sec downlink. Attempt downlink holding 125 psi back pressure on annulus to compensate for compressibility of CBM and got successful downlink. 10/17/2016 10/17/2016 1.25 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 17,873.0 17,968.0 16:00 17:15 17,873' MD to 17,968' MD, 275 gpm, 3800 psi, ECD=10.78 ppg EMW, 160 rpm 14.5k Tq, 10-15k WOB. P/U=245k, S/0=105k, ROT=160k. Pumped HV/LV anti jamming sweep with no graphite @ 17,915' MD. Page 39/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) -'` CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (MB) 10/17/2016 10/17/2016 1.00 PROD1 DRILL DHEQ T Continue circulating 280 gpm, 3800 17,968.0 17,968.0 17:15 18:15 psi, sending downlink commands to Powerdrive and confirming successful downlink. 10/17/2016 10/18/2016 5.75 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 17,968.0 18,541.0 18:15 00:00 17,968' MD to 18,541' MD, 7,615' TVD, ADT=4.43 hrs, Jar Hrs=39.34. 275 gpm, 3920 psi, ECD=11.18 ppg EMW, 160 rpm Tq on/off=1 5.5k/1 3.8k, 10-15k WOB. P/U=240k, S/0=95k, ROT=162k. Ran vacuum de -gasser in attempt to remove .1 ppg difference in pressure balance/mud balance. No change, 9.5/9.4 ppg OA pressure @ 22:00 hrs=550 psi Daily seepage losses= 50 bbl. 10/18/2016 10/18/2016 12.00 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 18,541.0 19,971.0 00:00 12:00 18,541' MD to 19,971' MD, 7,631' TVD, ADT=7.74 hrs, Jar Hrs=47.08. 277 gpm, 4075 psi, ECD=11.04 ppg EMW, 150 rpm Tq on/off=17k/15.5k, 10-15k WOB. P/U=250k, S/O=N/A, ROT= 160k. Lost SOW @ 18,800' MD (pumps on). Begin dynamic connections, using pump #1 to hold 210 psi on annulus during connections @ 19,300' MD. OA pressure @ 11:20 hrs=530 psi Pump HV/LV anti -jam sweeps 2 per tour without graphite. Tour seepage losses= 82 bbl. 10/18/2016 10/19/2016 12.00 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 19,971.0 21,210.0 12:00 00:00 19,971' MD to 21,210' MD, 7,640' TVD, ADT=6.44 hrs, Jar Hrs=53.52. 270 gpm, 4200 psi, ECD=11.48 ppg EMW, 150 rpm Tq on/off=1 9.5k/1 4.2k, 10-15k WOB. P/U=250k, S/O=N/A, ROT=160k. Performing dynamic connections with pump #1 holding 210 psi on annulus during connections. OA pressure @ 22:00 hrs=520 psi Tour seepage losses= 66 bbl. 10/19/2016 10/19/2016 9.75 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 21,210.0 22,276.0 00:00 09:45 21,210' MD to 22,276' MD. 270 gpm, 4200 psi, ECD=11.42 ppg EMW, 180 rpm Tq on/off=20k/17.2k, 10-15k WOB. P/U=255k, S/O=N/A, ROT= 161 k. Continue dynamic connections with pump #1 holding 210 psi on annulus. Change MWD transmit frequency due difficulty obtaining surveys from 21,500' MD. Reduce to 1.5hz, 1 bps to stay in sync. Page 40/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) s CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (W) 10/19/2016 10/19/2016 0.50 PROD1 DRILL CIRC T Circulate @ 22,276' MD, 270 gpm 22,276.0 22,276.0 09:45 10:15 4000 psi, 100 rpm, 14k TQ. Troubleshoot MWD tools. Changing data rate / frequency for real time log quality, weakened signal presumed due to MOBM compressibility, as well as limited stand pipe pressure. 10/19/2016 10/19/2016 0.25 PROD1 DRILL DDRL P Drill from 22,276' MD to 22,292' MD, 22,276.0 22,292.0 10:15 10:30 270 gpm, 4170 psi, 180 rpm, 18k Tq. 10/19/2016 10/19/2016 0.50 PROD1 DRILL CIRC T Circulate @ 22,292' MD, 270 gpm 22,292.0 22,292.0 10:30 11:00 4050 psi, 100 rpm, 15k TQ, continue troubleshoot MWD tools. Changing data rate / frequency for real time log quality. Downlink to reset to 1 bps rate. Note- SPR's taken with 200 psi back pressure. OA pressure @ 11:00 hrs=550 psi 10/19/2016 10/19/2016 1.00 PROD1 DRILL DDRL P Directional drill Alpine A lateral from 22,292.0 22,351.0 11:00 12:00 22,292' MD to 22,351' MD, 7,650' TVD, ADT=7.17. 270 gpm, 4200 psi, ECD=11.42 ppg EMW, 180 rpm Tq on/off=20k/17.2k, 10-15k WOB. P/U=255k, S/O=N/A, ROT=161k. Continue dynamic connections with pump #1 holding 210 psi on annulus. Fault #1 @ 22,242' MD (13' DTS), fault #2 @ 22,325' MD (17' DTS), no losses. Tour seepage losses= 19 bbl. 10/19/2016 10/20/2016 12.00 PROM DRILL DDRL P Directional drill Alpine A lateral from 22,351.0 23,544.0 12:00 00:00 22,351' MD to 23,544' MD, 7,685' TVD, ADT=7.21. 270 gpm, 4270 psi, ECD=11.82 ppg EMW, 180 rpm Tq on/off=21.1 k/17.1 k, 10-15k WOB. P/U=250k, S/O=N/A, ROT=155k. Continue dynamic connections with pump #1 holding 210 psi on annulus. Note- SPR's taken with 200 psi back pressure. Back in Alpine A @ 22,715' MD, 473' out of zone. OA pressure @ 22:00 hrs=540 psi Tour seepage losses= 73 bbl, 92 bbl today, 290 bbl cummulative. 10/20/2016 10/20/2016 12.00 PROM DRILL DDRL P Directional drill Alpine A lateral from 23,544.0 24,050.0 00:00 12:00 23,544' MD to 24,050' MD, 7,685' TVD, ADT=10.03. 273 gpm, 4175 psi, ECD=11.32 ppg EMW, 180 rpm Tq on/off= 1 7.5k/1 6.5k, 10-15k WOB. P/U=263k, S/O=N/A, ROT=160k. Continue dynamic connections with pump #1 holding 190 psi on annulus. Note- SPR's taken with 190 psi back pressure. Attempting to drop inc, several failed attempts to downlink resulted in B1 penetration @ 23,780' MD OA pressure @ 11:15 hrs=510 psi Tour seepage losses= 84 bbl. Page 41/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) z- CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/20/2016 10/20/2016 3.00 PROD1 DRILL DDRL P Continue attempting to drop inc, 24,050.0 24,117.0 12:00 15:00 control drill / directional drill Alpine A lateral, varying parameters from 24,050' MD to 24,117' MD, 7,685' TVD, ADT=2.86. 277 gpm, 4255 psi, ECD=11.33 ppg EMW, 180 rpm Tq on/off=17.5k/16.4k, 10-15k WOB. P/U=260k, S/O=N/A, ROT=160k. Could not achieve drop with Powerdrive. Decision to POOH. 10/20/2016 10/20/2016 6.25 PROD1 DRILL CIRC T Circulate bottoms up x 3, racking back 24,117.0 23,875.0 15:00 21:15 a stand each BU from 24,117' MD to 23,875' MD. Total pumped 22,000 stks, 2157 bbl. 10/20/2016 10/20/2016 1.25 PROD1 DRILL OWFF T Fingerprint Alpine A formation 23,875.0 23,875.0 21:15 22:30 pressure per CPAI / MPD procedure. Shut in MPD chokes and Orbit valve, monitor pressure increase for 15 min, rotate string 10 rpm. Pressure built to 22 psi and stabilized in 15 min. Perform exhale test, line up to trip tank and open chokes. Bled back .4 bbl in 10 minutes. Shut in chokes again, pressure built to 14 psi in 12 min, started rotary 10 rpm, pressure increased to 37 psi in 15 min, further to 83 psi in 40 min and stabilized. 10/20/2016 10/20/2016 0.25 PROD1 DRILL CIRC T Establish circulation to CBU, 280 gpm, 23,875.0 23,875.0 22:30 22:45 3980 psi, 100 rpm, 16.5k Tq. Shut down, blow down top drive to confirm fingerprint test. 10/20/2016 10/20/2016 0.75 PROD1 DRILL OWFF T Confirm Alpine A formation fingerprint 23,875.0 23,875.0 22:45 23:30 per CPA[ / MPD procedure. Establish rotation @ 10 rpm and allow torque to break over 12k. Shut in MPD chokes and Orbit valve, observe pressure build up to 77 psi in 15 minutes confirming test. 10/20/2016 10/21/2016 0.50 PROD1 DRILL CIRC T Establish circulation and begin CBU to 23,875.0 23,875.0 23:30 00:00 check for influx, 276 gpm, 4270 psi. OA pressure @ 22:00 hrs=500 psi Total seepage loss for tour=47 bbl, Daily =131 bbl, Cumulative interval=421 bbl. 10/21/2016 10/21/2016 1.50 PROD1 DRILL CIRC T Continue circulating bottoms up 275 23,875.0 23,875.0 00:00 01:30 gpm, 4130 psi, 110 rpm, 16.5-15.5k Tq @ 23,875' MD post fingerprinting. Small spike in gas just prior to bottoms up (6000 stks) and again at bottoms up (7200 stks) 0-124 units. 10/21/2016 10/21/2016 3.00 PROD1 DRILL CIRC T Circulate and weight up MOBM from 23,875.0 23,782.0 01:30 04:30 9.5 ppg to 9.7 ppg, 275 gpm, 4160 psi, 110 rpm, 15.5-16k Tq. Rack back stand @ bottoms up from 23,875' MD to 23,782' MD. Page 42/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) . " CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/21/2016 10/21/2016 2.75 PROD1 DRILL CIRC T Circulate and weight up MOBM from 23,782.0 23,687.0 04:30 07:15 9.7 ppg to 9.9 ppg, 275-250 gpm, 4180-3560 psi, 110-100 rpm, 15.5k Tq. Rack back stand @ bottoms up from 23,782' MD to 23,687' MD. 10/21/2016 10/21/2016 0.25 PROD1 DRILL OWFF T OWFF static, with rotary 10 rpm 12.5k 23,687.0 23,687.0 07:15 07:30 Tq. 10/21/2016 10/21/2016 0.25 PROD1 DRILL CIRC T Obtain SPR's with 9.9 ppg mud 23,687.0 23,687.0 07:30 07:45 weight, with 10 rpm, 12.5k Tq. 10/21/2016 10/21/2016 4.25 PROD1 DRILL BKRM T BROOH from 23,687' MD to 22,161' 23,687.0 22,161.0 07:45 12:00 MD @ 240 gpm, 3260 psi, 110 rpm, 15k Tq. ECD=11.65 ppg EMW. P/U=250k, S/O= N/A, ROT=160k. Calc Fill= 10 bbl, Actual Fill=40 bbl Mud loss for tour=41 bbl 10/21/2016 10/21/2016 2.75 PROD1 DRILL BKRM T Continue BROOH from 22,161' MD to 22,161.0 21,019.0 12:00 14:45 21,019' MD @ 240 gpm, 3300 psi, 110 rpm, 14.4k Tq. ECD=11.60 ppg EMW. P/U=250k, able to obtain S/O= 103k (broke over @ 90k), ROT=160k. 10/21/2016 10/21/2016 0.75 PROD1 DRILL MPDA T Blow down top drive, flow check- 21,019.0 21,019.0 14:45 15:30 static. Change out MPD RCD element due leaking. 10/21/2016 10/21/2016 6.00 PROD1 DRILL CIRC T Circulate 3 bottoms up from 21,019' 21,019.0 20,734.0 15:30 21:30 MD to 20,734' MD, 240-220 gpm, 3330-2820 psi, 110-100 rpm, 14.9- 14.4k Tq. After first bottoms up to clean hole, weight up active system from 9.9 ppg to 10.0 ppg and treat with viscosifier to prevent sag. 10/21/2016 10/21/2016 0.25 PROD1 DRILL OWFF T Shut down, blow down top drive. Flow 20,734.0 20,734.0 21:30 21:45 check well - static. 10/21/2016 10/22/2016 2.25 PROD1 DRILL SMPD T Line up MPD and strip out of hole from 20,734.0 19,018.0 21:45 00:00 20,734' MD to 19,018' MD per stripping schedule, 1500 fph, 310 psi pulling and 50 psi in slips. Reduce pulling pressure to 280 psi due over hole fill. OA pressure @ 22:00 hrs=500 psi Loss for tour=80 bbl, Daily=121 bbl, Cummulative interval=542 bbl. 10/22/2016 10/22/2016 4.25 PROD1 DRILL SMPD T Continue stripping out of hole with 19,018.0 15,729.0 00:00 04:15 MPD from 19,018' MD to 15,729' MD per stripping schedule, 1500 fph, 280 psi pulling and 50 psi in slips. Reduce pulling pressure to 260 psi and in slips to 20 psi over hole fill. OA pressure @ 22:00 hrs=500 psi Loss for tour=80 bbl, Daily=121 bbl, Cummulative interval=542 bbl. 10/22/2016 10/22/2016 0.75 PROD1 DRILL SMPD T Strip into shoe with BHA from 15,729' 15,729.0 15,550.0 04:15 05:00 MD with 10 rpm rotary, due WEPS reamer hanging up on shoe, observing 25-30k overpull. Pull into shoe with 10 rpm without issues, ROT= 195k to 15,550' MD.. Page 43/73 Report Printed: 12/1/2016 s Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/22/2016 10/22/2016 0.50 PROM DRILL CIRC T Establish circulation, stage up to 260 15,550.0 15,494.0 05:00 05:30 gpm, 2830 psi, 60-80 rpm, 10.4k Tq. ROT -=158k. Rack back stand @ 15,494' MD. 10/22/2016 10/22/2016 1.50 PROD1 DRILL CIRC T Continue circulate bottoms up, 270 15,494.0 15,494.0 05:30 07:00 gpm, 3190 psi, 80 rpm, 10.9k Tq, P/U=257k, S/0=128k, ROT=157k. 10/22/2016 10/22/2016 0.50 PROM DRILL OWFF T Flow check for 30 minutes, static. 15,494.0 15,494.0 07:00 07:30 10/22/2016 10/22/2016 4.00 FROM DRILL SMPD T Continue stripping out of hole with 15,494.0 12,171.0 07:30 11:30 MPD from 15,494' MD to 12,171' MD per stripping schedule, 1500-2000 fph, 260-240 psi pulling and 20 psi in slips. OA pressure @ 12:00 hrs=300 psi 10/22/2016 10/22/2016 0.25 PROD1 DRILL OWFF T Observe slight change in trip sheet 12,171.0 12,171.0 11:30 11:45 trend, from 3.5-4 bbl/5 stands to 3 bbl/5 stands (2.7 bbl calc), pulling 4" 14# pipe. Shut down and flow check well, static. 10/22/2016 10/22/2016 9.50 PROM DRILL SMPD T Continue stripping out of hole with 12,171.0 998.0 11:45 21:15 MPD from 12,171' MD to 998' MD per stripping schedule, 2000-4000 fph, 240-100 psi pulling and 20 psi in slips. 10/22/2016 10/22/2016 0.25 FROM DRILL OWFF T Line up and flow check for 10 minutes, 998.0 998.0 21:15 21:30 static. 10/22/2016 10/22/2016 0.75 PROM DRILL MPDA T Remove RCD element and install trip 998.0 998.0 21:30 22:15 nipple as per MPD rep. OA @ 22:00 hrs=250 psi 10/22/2016 10/22/2016 0.75 PROD1 DRILL TRIP T POOH on elevators from 998' MD to 998.0 152.0 22:15 23:00 152' MD. Note: SLM out of hole and check hard banding for wear. Tool joints on stands #60 to #1 show significant wear. 10/22/2016 10/23/2016 1.00 FROM DRILL BHAH T Flow check static. Lay down BHA #8 152.0 0.0 23:00 00:00 as per DD/MWD reps from 152' MD. Calc Fill= 124.7 bbl, Actual Fill=179.5 bbl. Daily loss to formation=55 bbl, Cummulative=597 bbl. 10/23/2016 10/23/2016 1.00 PROM DRILL RURD T Clean and clear rig floor, prep and 0.0 0.0 00:00 01:00 PJSM on testing BOPE. SIMOPS- monitor well via trip tank, no gain/loss. 10/23/2016 10/23/2016 0.75 PROM WHDBOP RURD P Drain stack, pull wear ring and set test 0.0 0.0 01:00 01:45 plug with 4" test joint per FMC rep. SIMOPS- Line up hole fill on annulus to continuously monitor while testing. 10/23/2016 10/23/2016 0.75 PROD1 WHDBOP RURD P Clear mudlines of MOBM, rig up to 0.0 0.0 01:45 02:30 test BOPE. Flood and flush equipment and lines with water. Grease IBOP. Purge air from equipment / lines. Perform body test on BOP, holding. Page 44/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 10/23/2016 10/23/2016 6.75 PROD1 WHDBOP BOPE P Test BOPE with 4" and 41/2' Test joints 0.0 0.0 02:30 09:15 250/3500 psi. AOGCC Bob Noble waived witness. Tested annular preventer to 250/2500 psi w/both test joints. Tested 3'/2' x 6" upper and lower VBR's w/both test joints, blind rams, choke valves #1-14, needle valve above #1, 4" kill line Demco, 4" XT39 Dart, 4" XT39 FOSV, HCR and manual choke and kill valves to 250/3500 psi for 5 minutes each. Flush poor boy degasser, test manual and super chokes to 1100 psi. Upper IBOP failed pressure test. Will change out upper and lower as assembly. 10/23/2016 10/23/2016 0.50 PROD1 WHDBOP BOPE P Performed accumulator test. System 0.0 0.0 09:15 09:45 pressure= 2950 psi, Pressure after functioning rams and annular= 1525 psi, 200 psi attained=29 sec, Full system recovery=146 sec, 4 bottle N2 average= 2050 psi. Tested gas alarms and PVT alarm systems. 10/23/2016 10/23/2016 0.75 PROD1 WHDBOP RURD P Rig down BOP test equipment, pull 0.0 09:45 10:30 test plug and install 7.1875" ID wear ring per FMC. Clean and clear rig floor. SIMOPS- Continue monitor well via trip tank. 10/23/2016 10/23/2016 3.00 PROD1 WHDBOP RGRP T PJSM and remove / replace auto and 0.0 0.0 10:30 13:30 manual IBOP together (pre -made up) due to auto (upper) IBOP failed on BOP test. Install new 4" XT39 saver sub. 10/23/2016 10/23/2016 1.00 PROD1 WHDBOP BOPE T R/U and test auto and manual IBOP to 0.0 0.0 13:30 14:30 250/3500 psi, 5 min each charted. 10/23/2016 10/23/2016 2.00 PROD1 DRILL SVRG T Re -assemble top drive pipe handler 0.0 0.0 14:30 16:30 and bell guide. Torque and wire tie all bolts. (This time period due from planned changing out of worn saver sub, not due IBOP) 10/23/2016 10/23/2016 0.75 PROD1 DRILL SVRG T Change out swivel packing on top 0.0 0.0 16:30 17:15 drive, clean and clear rig floor. Lay down bad IBOP. 10/23/2016 10/23/2016 2.00 PROD1 DRILL BHAH T PJSM and M/U BHA #9. Change out 0.0 0.0 17:15 19:15 Powerdrive stabilizer, WEPS reamer. Make up BHA and bit, stand back in derrick. 10/23/2016 10/24/2016 4.75 PROD1 DRILL PULD T PJSM and lay down 41 stands 4" 14# 0.0 0.0 19:15 00:00 drill pipe (Worn hard banding) from derrick, via mousehole. Separate out good joints for re -run. OA pressure @ 22:00 hrs=210 psi Daily fluid lost to formation=12 bbl, Cummulative interval=609 bbl. 10/24/2016 10/24/2016 1.75 PROD1 DRILL PULD T Continue laying down 4" 14# DP (12 0.0 0.0 00:00 01:45 stands) via mousehole to pipeshed. Monitor well via trip tank, -.5 bph static loss. Page 45/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/24/2016 10/24/2016 0.75 PROD1 DRILL RURD T Clean and clear rig floor, prep 0.0 0.0 01:45 02:30 pipeshed or P/U 4" DP. SI MOPS- PJSM for P/U BHA #9 from derrick and P/U 4" DP from pipeshed. 10/24/2016 10/24/2016 0.50 PROD1 DRILL BHAH T Make up 6%" BHA #9 from derrick to 0.0 318.0 02:30 03:00 318' MD. 10/24/2016 10/24/2016 2.25 PROD1 DRILL PULD T Single in hole with 4" 14# DP from 318.0 2,208.0 03:00 05:15 318' MD to 2,208' MD 10/24/2016 10/24/2016 0.50 PROD1 DRILL DHEQ T Shallow pulse test MWD @ 220 gpm 2,208.0 2,208.0 05:15 05:45 1560 psi, good. Blow down top drive, install air slips. 10/24/2016 10/24/2016 2.00 PROD1 DRILL PULD T Continue singling in the hole from 2,208.0 4,104.0 05:45 07:45 2,208' MD to 4,104' MD 10/24/2016 10/24/2016 0.50 PROD1 DRILL DHEQ T Fill pipe, continue pumping to check 4,104.0 4,104.0 07:45 08:15 Orbit tool 220 gpm, 1767 psi. 10/24/2016 10/24/2016 0.25 PROD1 DRILL SVRG T Blow down top drive, Flow check well. 4,104.0 4,104.0 08:15 08:30 10/24/2016 10/24/2016 2.50 PROD1 DRILL PULD T Lay down and change out joints of 4" 4,104.0 4,701.0 08:30 11:00 DP, while continue singling in the hole from 4,104' MD to 4,701' MD. OA pressure @ 10:30 hrs=255 psi 10/24/2016 10/24/2016 0.75 PROD1 DRILL TRIP T RIH on stands from 4,701' MD to 4,701.0 5,994.0 11:00 11:45 5,994' MD 10/24/2016 10/24/2016 0.25 PROD1 DRILL DHEQ T Fill pipe, continue pumping to check 5,994.0 12,334.0 11:45 12:00 Orbit tool 220 gpm, 1767 psi. Blow down top drive. 10/24/2016 10/24/2016 5.50 PROD1 DRILL TRIP T RIH on stands, fill pipe every 20 5,994.0 12,334.0 12:00 17:30 stands from 5,994' MD to 12,334' MD, filling pipe every 20 stands. 10/24/2016 10/24/2016 2.50 PROD1 DRILL PULD T Continue RIH, picking up 60 joints 4" 12,334.0 14,172.0 17:30 20:00 HWDP from pipe shed. 10/24/2016 10/24/2016 0.25 PROD1 DRILL TRIP T RIH on stands of 4" 15.7# DP 14,172' 14,172.0 14,939.0 20:00 20:15 MD to 14,939' MD. 10/24/2016 10/24/2016 1.00 PROD1 DRILL DLOG T Establish circulation @ 220 gpm, 2850 14,939.0 14,957.0 20:15 21:15 psi. Real time log Gamma @ 250 fph from 14,939' MD to 14,973' MD to locate RA tag. Locate RA tag @ 14,899' (14,960' bit depth) 297 gAPI. P/U to 14,950', rotate 60 rpm and log down, locate RA tag at 14,896.5' (14,957.8' bit depth) 303 gAPI. 2.2' difference between slack off and rotating. P/U=240k, S/0=135k, ROT=172k. 10/24/2016 10/24/2016 0.75 PROD1 DRILL TRIP T RIH on stands of 4" 15.7# DP 14,957' 14,957.0 15,506.0 21:15 22:00 MD to 15,506' MD. OA pressure @ 22:00 hrs=200 psi 10/24/2016 10/24/2016 1.50 PROD1 DRILL SLPC T OWFF static, slip and cut 85' drilling 15,506.0 15,506.0 22:00 23:30 line. Calibrate block height for Totco and SLB. 10/24/2016 10/25/2016 0.50 PROD1 DRILL SVRG T Service topdrive, draw works and iron 15,506.0 15,506.0 23:30 00:00 roughneck. Daily mud to formation= 11 bbl, Cummulative interval=620 bbl 10/25/2016 10/25/2016 0.75 PROD1 DRILL MPDA T TPism, Remove trip nipple and 15,506.0 15,506.0 00:00 00:451 installed RCD bearing. Page 46/73 Report Printed: 12/1/2016 k" Operations Summary (with Timelog Depths) r' CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/25/2016 10/25/2016 0.25 PROD1 DRILL MPDA T Line up MPD manifold and establish 15,506.0 15,506.0 00:45 01:00 circulation & break in RCD bearing as per MPD rep 10/25/2016 10/25/2016 2.00 PROD1 DRILL CIRC T Circ B/U w/220 - 250 gpm, 3300 - 15,506.0 15,506.0 01:00 03:00 3820 psi, 80 - 50 rpm, 9 - 10 k trq 10/25/2016 10/25/2016 0.25 PROD1 DRILL CIRC T SPR's & T&D parameters. 15,506.0 15,506.0 03:00 03:15 10/25/2016 10/25/2016 0.50 PROD1 DRILL MPDA T B/D top drive. Line up MPD equipment 15,506.0 15,506.0 03:15 03:45 to strip in hole. 10/25/2016 10/25/2016 9.00 PROD1 DRILL SMPD T Strip in hole as per MPD schedule 15,506.0 23,847.0 03:45 12:45 f/15,506' to 23,847' (Lost S/O wt @ 23,847') 10/25/2016 10/25/2016 4.75 PROD1 DRILL REAM T W&R f/23,847' to 24,117'w/200 gpm, 1 23,847.0 24,117.0 12:45 17:30 3600 psi, 60 rpm, 7.4 k trq 10/25/2016 10/26/2016 6.50 PROD1 DRILL DDRL P Drill ahead f/24,117' to 24,556' MD / 24,117.0 24,556.0 17:30 00:00 7,694' TVD, ADT 4.03 hrs, ECD 11.41 ppg, 240 gpm, 4350 psi, PU wt 255 k, SO wt N/A, ROT wt 170 k, 140 rpm, 19.7/15.7 k ft/lbs trq, 15 k wob 10/26/2016 10/26/2016 1.75 PROD1 DRILL DDRL P Drill ahead f/24,566' to 24,665' MD / 24,556.0 24,665.0 00:00 01:45 7,691' TVD, ADT .83 hrs, (Having issues downlinking to tools) 10/26/2016 10/26/2016 1.25 PROD1 DRILL CIRC T Unable to downlink with pumps at 24,665.0 24,665.0 01:45 03:00 12%. Attempted to downlink with rotation at 36 second intervals, again with no success. Increased to 60 second intervals with the rotational downlink, off bottom, and had a positive response from tool. 10/26/2016 10/26/2016 9.00 PROD1 DRILL DDRL P Drill ahead f/24,665' to 25,275' MD / 24,665.0 25,275.0 03:00 12:00 7,696' TVD, ADT 6.3 hrs, ECD 11.45 ppg, 240 gpm, 4280 psi, PU wt 280 k, SO wt N/A, ROT wt 173 k, 140 rpm, 18.3/14.5 k ft/lbs trq, 15 k wob 10/26/2016 10/27/2016 12.00 PROD1 DRILL DDRL P Drill ahead (/25,275' to 26,217' MD / 25,275.0 26,217.0 12:00 00:00 7,701' TVD, ADT 7.78 hrs, ECD 11.63 ppg, 240 gpm, 4350 psi, PU wt 265 k, SO wt N/A, ROT wt 170 k, 140 rpm, 19.7/14.8 k ft/lbs trq, 15 k wob 10/27/2016 10/27/2016 12.00 PROD1 DRILL DDRL P Drill ahead f/26,217' to TD of 27,128' 26,217.0 27,128.0 00:00 12:00 MD / 7,716' TVD, ADT 829 hrs, ECD 11.42 ppg, 235 gpm, 4240 psi, PU wt 275 k, SO wt N/A, ROT wt 164 k, 140 rpm, 19.9/16.5 k ft/lbs trq, 15 k wob Longest well in state of Alaska 10/27/2016 10/27/2016 10.75 PROD1 CASING CIRC P Circulated 4x BU f/ 27,129' to 26,747' 27,128.0 26,747.0 12:00 22:45 MD, racking back 1 stand per BU. 236 gpm, 4340-4260 psi, 140-90 rpm, 19.2-18.4 Tq. 10/27/2016 10/27/2016 0.50 PROD1 CASING OWFF T Attempted to fingerprint formation. 26,747.0 26,747.0 22:45 23:15 RCD element leaked and test was inconclusive. Decision was made to weight up to 9.7 ppg MW. 10/27/2016 10/28/2016 0.75 PROD1 CASING CIRC P Start weighting up MW from 9.5 ppg to 26,747.0 26,747.0 23:15 00:00 9.7 ppg. 235 gpm, 4250 psi, 100 rpm, 17.6 Tq. Page 47/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) �r CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 10/28/2016 10/28/2016 3.00 PROD1 CASING CIRC P Weighted up MW from 9.5 ppg to 9.7 26,747.0 26,747.0 00:00 03:00 ppg. 235 gpm, 4300 psi, 100 rpm, 16.3 Tq. 10/28/2016 10/28/2016 0.25 PROD1 CASING OWFF P Observed well for flow. Well Static w/ 26,747.0 26,747.0 03:00 03:15 9.7 ppg MW 10/28/2016 10/28/2016 3.75 PROD1 CASING CIRC P Weighted up MW f/ 9.7 ppg to 9.9 ppf 26,747.0 26,652.0 03:15 07:00 for trip margin and racked back one stand. 230 gpm, 4250 psi, 17.5 Tq. 10/28/2016 10/28/2016 0.50 PROD1 CASING OWFF P Observed well for flow. Well Static w/ 26,652.0 26,652.0 07:00 07:30 9.9 ppg MW. 10/28/2016 10/28/2016 0.25 PROD1 CASING CIRC P Took SPR and recorded S/O of 95 kLb 26,652.0 26,652.0 07:30 07:45 at 26652' MD 10/28/2016 10/28/2016 0.75 PROD1 CASING MPDA P Changed out RCD bearing and broke 26,652.0 26,652.0 07:45 08:30 in new element with 200 gpm, 100 rpm, 17.5 Tq. 10/28/2016 10/28/2016 3.50 PROD1 CASING BKRM P BROOH f/ 26652' to 25413' MD at 200 26,652.0 25,413.0 08:30 12:00 -230 gpm, 3700-4200 psi, 100 rpm, and 17 Tq. 10/28/2016 10/28/2016 6.50 PROD1 CASING BKRM P BROOH f/ 25,413' to 23,031' MD at 25,413.0 23,031.0 12:00 18:30 230 gpm, 4200 psi, 100 rpm, and 16.5 Tq. S/O = 120k, P/U = 165k 10/28/2016 10/29/2016 5.50 PROD1 CASING CIRC P Circulated 3x BU at 320 gpm, 4040 23,031.0 22,841.0 18:30 00:00 psi, 100 rpm, 16 Tq. Racking back 1 stand per BU f/ 23,031' to 22,841' MD. 10/29/2016 10/29/2016 1.25 PROD1 CASING CIRC P Finished circulating 3x BU at 320 gpm, 23,031.0 22,841.0 00:00 01:15 4050 psi, 110 rpm, 15 Tq. 10/29/2016 10/29/2016 0.50 PROD1 CASING OWFF P OWFF, well static with 10 ppg MW. 22,841.0 22,841.0 01:15 01:45 10/29/2016 10/29/2016 7.25 PROD1 CASING SMPD P SOOH f/22,841' to 15,506' MDm 22,841.0 15,506.0 01:45 09:00 holding back pressure as per schedual. P/U= 250k, S/O= 133k. 10/29/2016 10/29/2016 3.00 PROD1 CASING REAM T Cleaned and polished the 7 5/8" 15,506.0 15,506.0 09:00 12:00 casing shoe. Started reaming through with 225 gpm, 3100 psi, 80 rpm, 9.5 Tq and observed 30k WOB on the down. Worked through shoe several times, cleaning the shoe and reducing drag. 10/29/2016 10/29/2016 0.50 PROD1 CASING REAM P Continued reaming the 7 58P Shoe. 15,506.0 15,697.0 12:00 12:30 Final parameters after cleaning; 265 gpm, 4280 psi, 40 rpm, 12k Tq, with P/U= 245k, S/O= 130k, ROT= 175k. No obstructions observed. 10/29/2016 10/29/2016 1.50 PROD1 CASING CIRC P Circulate BU while racking back a 15,697.0 15,506.0 12:30 14:00 stand. 270 gpm, 4300 psi, 80 rpm, 11 Tq. 10/29/2016 10/29/2016 0.50 PROD1 CASING OWFF P OWFF, well static. SimOps, blow 15,506.0 15,506.0 14:00 14:30 down top drive. 10/29/2016 10/29/2016 0.50 PROD1 CASING SMPD P SOOH f/ 15,506'to 15,030' MD 15,506.0 15,030.0 14:30 15:00 holding 240 psi pulling and 80 psi in slips. 10/29/2016 10/29/2016 1.75 PROD1 CASING DLOG P Logged the Alpine C for correlation 15,030.0 15,126.0 15:00 16:45 f/14,970' to 15,080' MD (15,030'- 15,142' Bit Depth). 260 gpm, 3820 psi, 60 rpm, 10 Tq. 10/29/2016 10/30/2016 7.25 PROD1 CASING SMPD P Pump 40 bbl, 12 ppg dry job and 15,126.0 5,613.0 16:45 00:00 SOOH f/ 15,126'to 5,613' MD holding 160-140 pulling and 80-20 psi in slips. Page 48173 Report Printed: 12/1/2016 - Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/30/2016 10/30/2016 3.00 PROD1 CASING SMPD P SOON f/ 5,613' MD to 1,067' MD 5,613.0 1,067.0 00:00 03:00 holding 140 psi pulling and 60 psi in slips. 10/30/2016 10/30/2016 1.00 PROD1 CASING CIRC P Functioned ann, upper, and lower 1,067.0 1,607.0 03:00 04:00 rams. Circulated clean at 210 gpm, 1220 psi, 30 rpm, 1 Tq. OWFF 15 min, well static. 10/30/2016 10/30/2016 0.75 PROD1 CASING MPDA P Removed RCD bearing and installed 1,607.0 1,607.0 04:00 04:45 trip nipple. 10/30/2016 10/30/2016 0.75 PROD1 CASING TRIP P POOH f/ 1,067'to 310' MD. 1,607.0 310.0 04:45 05:30 10/30/2016 10/30/2016 0.25 PROD1 CASING SHAH P Racked back jars and HWDP f/ 310' to 310.0 127.0 05:30 05:45 127' MD. 10/30/2016 10/30/2016 0.25 PROD1 CASING OWFF P OWFF, Slight drop in fluid. 127.0 127.0 05:45 06:00 10/30/2016 10/30/2016 2.75 PROD1 CASING SHAH P L/D BHA as per SLB. Clean and clear 127.0 0.0 06:00 08:45 rig floor. Calculated trip Disp= 140.43 bbl, Actual= 179 bbl. 10/30/2016 10/30/2016 1.00 COMPZ1 CASING RURD P P/U 4 1/2" liner running equipment. 0.0 0.0 08:45 09:45 R/U power tongs and tubing elevators. 10/30/2016 10/30/2016 12.75 COMPZ1 CASING PUTS P Run 4 1/2" 12.6# L-80 TXP linere 0.0 11,809.0 09:45 22:30 w/Frac sleevesas per tally to 11,809' MD. P/U= 69k, S/O= 72k. 10/30/2016 10/31/2016 1.50 COMPZ1 CASING OTHR P Change out elevators and P/U liner 11,809.0 11,845.0 22:30 00:00 hanger. P/U SCMT logging tool and make up to 4 1/2" liner. SCMT activatted at 23:23 10/30/16. 10/31/2016 10/31/2016 0.50 COMPZ1 CASING OTHR P Mix and pour Pal Mix in liner tie back. 11,845.0 11,845.0 00:00 00:30 Clean and clear floor of 4 1/2" running equipment. 10/31/2016 10/31/2016 0.50 COMPZ1 CASING CIRC P Brake circulation and washed down 1 11,845.0 11,948.0 00:30 01:00 stand. 84 gpm, 450 psi 10/31/2016 10/31/2016 2.50 COMPZ1 CASING RUNL P RIH on 4" DP f/ 11,948'to 15,459' MD. 11,948.0 15,459.0 01:00 03:30 S/O= 120k 10/31/2016 10/31/2016 2.50 COMPZ1 CASING CIRC P Circulate & condition mud w/2 - 3 bpm 15,459.0 15,553.0 03:30 06:00 @ 590 - 800 psi. Even mud wt 9.8 ppg In/Out, P/U wt= 185 k, S/O wt = 120 k. SIMOPS - P/U & rack back in derrick 10 stands HWDP. 10/31/2016 10/31/2016 0.50 COMPZ1 CASING OTHR P Obtained T&D readings. P/U= 195k, 15,553.0 15,553.0 06:00 06:30 S/O=120k, ROT= 150k. 10 rpm w/ 7k Tq, 20 rpm w/ 7k Tq. 10/31/2016 10/31/2016 5.50 COMPZ1 CASING RUNL P RIH with 4" DP f/ 15,553 to 24,158' 15,553.0 24,158.0 06:30 12:00 MD. S/O= 97k 10/31/2016 10/31/2016 1.00 COMPZ1 CASING RUNL P Continue RIH f/ 24,158'to 25,080' MD 24,158.0 25,080.0 12:00 13:00 10/31/2016 10/31/2016 2.00 COMPZ1 CASING CIRC T Unable to P/U or S/O. Attempted 25,080.0 25,080.0 13:00 15:00 several times to work pike free with pumps on, 100 gpm, 1200 psi. P/U FOSV and working joint of DP. worked 14 wraps in to the pipe with 7k Tq and string came free. 10/31/2016 11/1/2016 9.00 COMPZ1 CASING CIRC T Reduced MW to 9.8 ppg and added 25,080.0 25,080.0 15:00 00:00 beads. Reciprocated pipe @ 71-104 gpm, 1100-1200 psi, 2-9 rpm, and 8k tq. P/U= 245, S/O= 120. Page 49/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) C D5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/1/2016 11/1/2016 0.25 COMPZ1 CASING CIRC T Finished reducing MW to 9.8 ppg 25,080.0 25,080.0 00:00 00:15 while reciprocating pipe. 100 gpm, 1050 psi, 4 rpm, 8 TQ. Pumped 20 bbl, 10 ppg dry job. 11/1/2016 11/1/2016 0.25 COMPZ1 CASING OWFF T OWFF, Well Static. 25,080.0 25,080.0 00:15 00:30 11/1/2016 11/1/2016 1.25 COMPZ1 CASING RUNL P UD single and TIW and resume RIH f/ 25,080.0 26,636.0 00:30 01:45 25,080' to 26,636' MD. 11/1/2016 11/1/2016 1.75 COMPZ1 CASING RUNL P Continued to RIH liner (/26,636' to set 26,636.0 27,071.0 01:45 03:30 depth 27,071' MD. Liner differentially stuck while in slips. Set torque stall to 7 k ft/lbs of torque and applied right hand rotation. Had to work pipe up w/300 k max & block wt down to break differential and get pipe moving. Once pipe free & rotating, rotated pipe to bottom w/5 - 10 rpm @ 7 k ft/lbs of torque, 125 k free slack of rotating wt, and no pumps. 11/1/2016 11/1/2016 0.50 COMPZ1 CASING CIRC P Established circulation at 65 gpm and 27,071.0 27,071.0 03:30 04:00 1050 psi. 11/1/2016 11/1/2016 3.25 COMPZ1 CASING PACK P Set 4 1/2" liner hanger and packer as 27,071.0 15,226.0 04:00 07:15 per Baker. Dropped 29/32" ball and circulated down at 2.5 bpm, 1250 psi. Slowed to 1 bpm at 1000 stk. Ball seat at 1474 stk and pressured up to 2000 psi. Held pressure and S/O to 80k to set hanger. Pressured up to 4010 psi and did not see indication that pusher tool sheared or ball blow off seat Bled off and P/U 5.5' to expose dog subs. Slacked off to 60k while rotating at 10 rpm to ensure ZXP packer was set. Tested annular to 2000 psi and held. Pressured back up to 4700 psi with test pump to shear ball seat and bled off. (Shoe @ 27,071'& TOL 15,226') 11/1/2016 11/1/2016 0.25 COMPZ1 WELLPR TRIP P POOH of liner top & rack baxk 2 15,226.0 15,157.0 07:15 07:30 stands of DP f/15,226' to 15,157' 11/1/2016 11/1/2016 3.00 COMPZ1 WELLPR CIRC T Weight up top 10 ppg mud at 6.5 bpm, 15,157.0 15,157.0 07:30 10:30 2840 psi and pumped 35 bbl, 11.7 ppg dry job. 11/1/2016 11/1/2016 3.00 COMPZ1 WELLPR QEVL P POOH f/ 15,157'to 13,041' MD at 15,157.0 13,041.0 10:30 13:30 1200 ft/hr, logging with the CMNT tool. P/U= 240k. 11/1/2016 11/1/2016 1.50 COMPZ1 WELLPR PULD P POOH & L/D 10 stands HWDP 13,041.0 12,118.0 13:30 15:00 f/13,041'to 12,118' 11/1/2016 11/1/2016 1.50 COMPZ1 WELLPR SLPC P Slip and cut 105' of drill line. Service 12,118.0 12,118.0 15:00 16:30 top drive. 11/1/2016 11/2/2016 7.50 COMPZ1 WELLPR TRIP P POOH f/ 12,118' MD to 2,556' MD. 12,118.0 2,556.0 16:30 00:00 11/2/2016 11/2/2016 1.50 COMPZ1 WELLPR TRIP P POOH f/ 2,556' MD to 95' MD. 2,556.0 95.0 00:00 01:30 Calculated Disp.= 95.16 bbl, Act.= 96 bbl 11/2/2016 11/2/2016 1.50 COMPZ1 WELLPR BHAH P UD logging tool assy. and liner 95.0 0.0 01:30 03:00 running tool while monitoring well on TT. 11/2/2016 11/2/2016 0.50 COMPZ1 WELLPR BHAH P Clean and clear rig floor. 0.0 0.0 03:00 03:30 Page 50/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 11/2/2016 11/2/2016 0.50 COMPZ1 WELLPR SVRG P Serviced top drive, repaired grease 0.0 0.0 03:30 04:00 zert and inspected saver sub. 11/2/2016 11/2/2016 3.50 PROD2 WHPST BHAH P Mobilize milling BHA and whipstock 0.0 227.0 04:00 07:30 assy. to the rig floor. M/U milling assy. and scribe to the MWD (29.65 Deg. left of MWD). M/U whipstock assy and attached mill to mill w/ 45k bolt. 11/2/2016 11/2/2016 1.50 PROD2 WHPST TRIP P RIH BHA# 10 whipstock and mill f/ 227.0 1,648.0 07:30 09:00 227'to 1,648' MD. 11/2/2016 11/2/2016 0.25 PROD2 WHPST DHEQ P MWD shallow hole test, test good. 1,648.0 1,648.0 09:00 09:15 11/2/2016 11/2/2016 12.75 PROD2 WHPST TRIP P RIH f/ 1,1648'to 15,040' MD, filling 1,648.0 15,040.0 09:15 22:00 pipe every 20 stands. Calculated Disp.= 90.5 bbl, Act.= 86 bbl S/O= 93k. 11/2/2016 11/2/2016 0.75 PROD2 WHPST DLOG P Logged f/ 15,040' to 15,090' MD 2 15,040.0 15,090.0 22:00 22:45 times and logged RA tag at 14,898' MD (15,069' bit depth). 100-500 fph, 220 gpm, 2240 psi. 11/2/2016 11/2/2016 1.00 PROD2 WHPST HOSO P Oriented whipstock 24 deg. left of high 15,090.0 15,232.0 22:45 23:45 side and washed down to tag top of liner hanger. Observed seals entering SBE at 15,228' MD and locator tagged at 15,232' MD with 7k down weight. 11/2/2016 11/3/2016 0.25 PROD2 WHPST RURD P R/U to test seals to 1000 psi. 15,232.0 15,232.0 23:45 00:00 11/3/2016 11/3/2016 0.75 PROD2 WHPST PRTS P Pressure tested pack off seals in the 15,232.0 15,232.0 00:00 00:45 SBE to 1000 psi, staging up from 500 psi to 750 psi. Pressure test held. Rig floor was cleared of testing equipment. 11/3/2016 11/3/2016 0.50 PROD2 WHPST WPST P Set trip anchor with 15k down, picked 15,232.0 15,121.0 00:45 01:15 up to confirm with 10k over pull. Made several attempts to shear 45k shear bolt. Worked pip up to 240k (10 k overpull) and worked pipe down with 70k weight on bit. Broke circulation w/5 bpm. Made a total of 6 attempts & sheared bolt on up stroke. Top of whipstock without rotation @ 15,121' MD. 11/3/2016 11/3/2016 3.75 PROD2 WHPST MILL P Mill window f/ 15,121'to 15,134' MD at 15,121.0 15,134.0 01:15 05:00 275 gpm, 3450 psi, 100 rpm, 10-14K Tq. Pumped 25 bbl suppersweep once through 7 5/8" casing. (Tagged top of whipstock with rotationm with milling assembly @ 15,117') 11/3/2016 11/3/2016 1.50 PROD2 WHPST DDRL P Drilled new formation from 15,134'to 15,134.0 15,154.0 05:00 06:30 15,154' MD. 270 gpm, 3450 psi, 100- 120 rpm, 10-14k Tq. 11/3/2016 11/3/2016 1.25 PROD2 WHPST REAM P Dressed off window, working string 15,154.0 15,119.0 06:30 07:45 mills through at 270 gpm, 3450 psi, 100 rpm, 11-13k Tq. Pull back in to window. 11/3/2016 11/3/2016 0.25 PROD2 WHPST OWFF P OWFF, Well static 15,119.0 15,119.0 07:45 08:00 11/3/2016 11/3/2016 1.25 PROD2 WHPST CIRC P Circulate BU while reciprocating to 15,119.0 15,089.0 08:00 09:15 condition mud, L/D 1 stand. Page 51/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 11 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Cade Time P -T -X Operation (ftKB) End Depth (ftKB) 11/3/2016 11/3/2016 1.00 PROD2 WHPST FIT P Rigged up test equipment. Performed 15,089.0 15,089.0 09:15 10:15 FIT to 12 ppg EMW with 10 ppg OBM in the hole and 780 psi back pressure, test held. Bled off pressure, blew down lines, and rigged down test equipment. 11/3/2016 11/3/2016 0.50 PROD2 WHPST CIRC P Obtained slow pump rates and B/D15,089.0 15,089.0 10:15 10:45 TD. 11/3/2016 11/3/2016 emove rip nipple, installed 10:45 11:30 bearing, and warmed up elements. 11/3/2016 11/3/2016 0.75 PROM WHPST SMPD P SOOH f/ 15,089' to 14,643' MD while 15,089.0 14,643.0 11:30 12:15 holding BP as per stripping schedule. 11/3/2016 11/3/2016 0.50 PROD2 WHPST CIRC P Pumped 20 bbl, 11.7 ppg dry job and 14,643.0 14,643.0 12:15 12:45 B/D TD. 11/3/2016 11/4/2016 11.25 PROM WHPST SMPD P SOOH (/14,643' to 4,132' MD while 14,643.0 4,132.0 12:45 00:00 holding BP as per stripping schedule. L/D 20 stands HWDP & culled out bad joints of 4" 14# DP (48 jts total). 11/4/2016 11/4/2016 4.50 PROD2 WHPST SMPD P SOOH f/4,132'to 1,063' MD while 4,132.0 1,063.0 00:00 04:30 holding BP as per stripping schedule. Culled out bad joints of 4" 14# DP. 11/4/2016 11/4/2016 0.50 PROD2 WHPST OWFF P OWFF, well static. SimOps, Blow 1,063.0 1,063.0 04:30 05:00 down MPD system. 11/4/2016 11/4/2016 1.25 PROD2 WHPST MPDA P Removed RCD bearing and installed 1,063.0 1,063.0 05:00 06:15 trip nipple as per MPD advisor. 11/4/2016 11/4/2016 0.25 PROM WHPST OWFF P OWFF, well static. 1,063.0 1,063.0 06:15 06:30 11/4/2016 11/4/2016 1.75 PROD2 WHPST TRIP P POOH f/ 1,063'to 117' MD. (L/D 108 1,063.0 117.0 06:30 08:15 jts total 106 bad hard band & 2 good). 11/4/2016 11/4/2016 0.25 PROM WHPST OWFF P OWFF, well static. 117.0 117.0 08:15 08:30 11/4/2016 11/4/2016 1.50 PROD2 WHPST BHAH P L/D milling BHA as per Baker rep. 117.0 0.0 08:30 10:00 11/4/2016 11/4/2016 1.25 PROM WHPST BHAH P Clean and cleared rig floor. 0.0 0.0 10:00 11:15 11/4/2016 11/4/2016 0.50 PROD2 WHDBOP WWWH P Flush stack, B/D TD and lines. 0.0 0.0 11:15 11:45 11/4/2016 11/4/2016 2.00 PROM WHDBOP RURD P P/U 4" test joint, pull wear ring, and 0.0 0.0 11:45 13:45 set test plug. R/U to test BOPE and fill lines w/ water. Page 52/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 0,, » Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/4/2016 11/4/2016 6.50 PROD2 WHDBOP BOPE P Test BOPE with 4" and 4'/2' Test joints 0.0 0.0 13:45 20:15 250/3500 psi. AOGCC Lou Grimaldi waived witness. Tested annular to 250/2500 psi w/both test joints. Tested 3'/z' x 6" upper and lower VBR's w/both test joints, blind rams, choke valves #1-14, needle valve above #1, 4" kill line Demco, 4" XT39 Dart, 4" XT39 FOSV, HCR and manual choke and kill valves to 250/3500 psi for 5 minutes each. Flush poor boy degasser, test manual and super chokes to 1100 psi. Test auto and manual IBOP to 250/3500 psi, 5 min each charted. Performed accumulator test. System pressure= 3000 psi, Pressure after functioning rams and annular= 1500 psi, 200 psi attained=24 sec, Full system recovery= 144 sec, 4 bottle N2 average= 2100 psi. Tested gas alarms and PVT alarm systems. 11/4/2016 11/4/2016 1.00 PROD2 WHDBOP RURD P R/D BOP test equipment, pulled test 0.0 0.0 20:15 21:15 plug, and L/D test joint. Installed 7.125" ID wear ring. 11/4/2016 11/4/2016 2.25 PROD2 WHPST SVRG P Changed out saver sub and sevice 0.0 0.0 21:15 23:30 TD. 11/4/2016 11/5/2016 0.50 PROD2 WHPST BHAH P P/U BHA equipment to rig floor. 0.0 0.0 23:30 00:00 11/5/2016 11/5/2016 2.25 PROD2 WHPST BHAH P M/U 6 3 /4" Drilling BHA #11 as per 0.0 308.0 00:00 02:15 SLB. Changed out stabilizer on Orbit Tool to diamond impreg stab. 11/5/2016 11/5/2016 1.75 PROD2 WHPST PULD T Single in hole f/ 308'to 1,716' MD with 308.0 1,716.0 02:15 04:00 4" 14# DP from pipe shed with new hard banding. 11/5/2016 11/5/2016 0.50 PROD2 WHPST DHEQ P Shallow test MWD tool w/ 220 gpm, 1,716.0 1,716.0 04:00 04:30 1480 psi, 85k string weight. 11/5/2016 11/5/2016 4.00 PROD2 WHPST PULD T Continue singling in hole f/ 1.716' to 1,716.0 5,668.0 04:30 08:30 5,668' MD with 4" 14# DP w/ new hard banding. Fill pipe every 15 stands. 11/5/2016 11/5/2016 9.25 PROD2 WHPST TRIP P RIH f/ 5,668' to 14,853' MD out of 5,668.0 14,853.0 08:30 17:45 derrick, filling every 15 stands and strapping stands on the way in. Calculated Disp.= 88.9 bbl, Act.= 64 bbl. 11/5/2016 11/5/2016 0.75 PROD2 WHPST DLOG P Log RA tag at 14,893' MD with 240 14,853.0 14,949.0 17:45 18:30 gpm, 3080 psi, and 100 fph. B/D TD. 11/5/2016 11/5/2016 1.00 PROD2 WHPST SVRG P Slip & Cut 53' of drill line. 14,949.0 14,949.0 18:30 19:30 11/5/2016 11/5/2016 0.75 PROD2 WHPST SVRG P Service TD, DW, and tighten deadman 14,949.0 14,949.0 19:30 20:15 bearing. 11/5/2016 11/5/2016 0.75 PROD2 WHPST MPDA P Pull trip nipple and install RCD 14,949.0 14,949.0 20:15 21:00 bearing. P/U= 215k, S/O= 130k 11/5/2016 11/5/2016 0.25 PROD2 WHPST MPDA P Break in RCD bearing and pump up 14,949.0 15,044.0 21:00 21:15 survey at 240 gpm, 50-100 rpm. 11/5/2016 11/6/2016 2.75 PROD2 WHPST CIRC P Reduce MW f/ 10 ppg to 8.8 ppg at 15,044.0 15,044.0 21:15 00:00 245-260 gpm, 3610 psi, 60 rpm, and 8.5k Tq. Page 53/73 Report Printed: 12/1/2016 � y Operations Summary (with Timelog Depths) CD5-99 k "•4` Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/6/2016 11/6/2016 2.75 PROD2 WHPST CIRC P Continued to Circulate and condition 15,044.0 15,044.0 00:00 02:45 mud to 8.8 ppg MW, 260 gpm, 3610- 2980 psi, 60 rpm, 9k Tq while maintaining 10 ppg EMW w/ MPD. 11/6/2016 11/6/2016 0.75 PROD2 WHPST OWFF P Close choke to look for pressure, 15,044.0 15,044.0 02:45 03:30 opened up and OWFF, well static. 11/6/2016 11/6/2016 0.25 PROD2 WHPST CIRC P SPR's 15,044.0 15,044.0 03:30 03:45 11/6/2016 11/6/2016 0.50 PROD2 WHPST WASH P Wash down f/ 15,044'to 15,139' MD 15,044.0 15,139.0 03:45 04:15 and enter OH. 84 gpm, 490 psi, P/U= 215k, S/O= 125k. 11/6/2016 11/6/2016 1.50 PROD2 WHPST REAM P Washed and reamed through window 15,139.0 15,154.0 04:15 05:45 f/ 15,139' MD to base of hole at 15,154' MD, 260 gpm, 2790 psi, 30-50 rpm, 10-15k Tq. Stalled out 2x with near bit stay at BOW, P/U to release torque reduced pumps to 180 gpm, 1550 psi, 50 rpm, 9-10.5k Tq, and worked stay in to OH. P/U= 215k, S/O= 125k, Rot= 165k. 11/6/2016 11/6/2016 1.00 PROD2 DRILL DDRL P Drill f/ 15,154' to 15,182' MD, 7,516' 15,154.0 15,182.0 05:45 06:45 TVD. 11/6/2016 11/6/2016 2.25 PROD2 DRILL CIRC T Circulated and conditioned mud while 15,182.0 15,182.0 06:45 09:00 trouble shooting Orbit turbine issues. 230-270 gpm, 2350-3120 psi, 50-30 rpm, 8k Tq. 11/6/2016 11/6/2016 0.75 PROD2 DRILL CIRC T Pump low/high vis. sweep, 5 bbl 15,182.0 15,182.0 09:00 09:45 LVT200 by 35 bbl Hi -vis pill at 270 gpm, 3120 psi, 30 rpm, and 8k Tq to clear/clean Orbit turbine. 11/6/2016 11/6/2016 2.25 PROD2 DRILL DDRL P Drill ahead f/ 15,182' to 15,301' MD / 15,182.0 15,301.0 09:45 12:00 7,542" TVD ADT 2.85 hrs, ECD 9.94 ppg, 260 gpm, 2970 psi, P/U wt 215 k, SO wt 125 k, ROT wt 150 k, 160 rpm, 11.5/8 k ft/lbs trq, 5-18 WOB. Pumped Lo/Hi Vis anti jamming sweeps to free up lower torquer on power drive. 11/6/2016 11/7/2016 12.00 PROD2 DRILL DDRL P Drill ahead f/ 15,301' to 16,377' MD / 15,301.0 16,377.0 12:00 00:00 7,487" TVD ADT 8.01 hrs, ECD 9.99 ppg, 260 gpm, 3020 psi, P/U wt 221 k, SO wt 119 k, ROT wt 159 k, 160 rpm, 13/10 k ft/lbs trq, 5-18 WOB. Pumped 3 Lo/Hi Vis anti jamming sweeps to free up lower torquer on power drive. 11/7/2016 11/7/2016 4.00 PROD2 DRILL DDRL P Drill ahead f/ 16,377' to 16,821' MD / 16,377.0 16,821.0 00:00 04:00 7,490" TVD ADT 3.02 hrs, 260 gpm, 3300 psi, 9.98 ECD, P/U wt 230 k, SO wt 120k, ROT wt 155 k, 160 rpm, 14/12 k ft/lbs trq, 5-18 WOB. Stopped Drilling due to anti -collision issue with original CD5-99 Intermediate section after survey corrections. 11/7/2016 11/7/2016 3.75 PROD2 DRILL CIRC T Circulated w/ 260-270 gpm, 2940 psi, 16,821.0 16,821.0 04:00 07:45 140-120 rpm, 10-10.5k Tq. Consult town on plan forward after anti - collision risk identified. 11/7/2016 11/7/2016 0.25 PROD2 DRILL CIRC T SPR's 16,821.0 16,758.0 07:45 08:00 Page 54/73 Repor4 Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/7/2016 11/7/2016 0.50 PROD2 DRILL CIRC T Continue circulating while consulting 16,758.0 16,758.0 08:00 08:30 town on plan forward w/270 - 260 gpm, 3040 - 2940 psi. 11/7/2016 11/7/2016 1.50 PROD2 DRILL CIRC T Start holding 180 psi back pressure 16,758.0 16,758.0 08:30 10:00 while circulating, 260 gpm, 2940 psi. Did not rotate due aid in DP & BHA wear. ECD's decreased from 9.7 to 9.4 ppg. Influx ofwell bore fluids suspected with lower ECD's. Cont. to consult with town. Decision made to POOH to shoe and monitor well for flow. 11/7/2016 11/7/2016 0.50 PROD2 DRILL SMPD T Strip OOH f/ 16,758' to 16,567' MD w/ 16,758.0 16,567.0 10:00 10:30 260 gpm, 2980 psi, holding 108/400 psi BP on/out of slips. 11/7/2016 11/7/2016 0.25 PROD2 DRILL SMPD T Attempt to SOOH f/ 16,567' to 16,377' 16,567.0 16,377.0 10:30 10:45 MD, 400/500 psi BP in/out of slips. Floats did not hold. 11/7/2016 11/7/2016 3.50 PROD2 DRILL SMPD T Pump OOH f/ 16,377' to 15,044' MD 16,377.0 15,044.0 10:45 14:15 w/ 260 gpm, 2790 psi holding 180/400 psi BP in/out of slips. Rotated 20 rpm 9-10k TQ to clear top of BHA through window. Observed 15k overpull with bit entering window. 11/7/2016 11/7/2016 0.50 PROD2 DRILL RURD T Rig up for FIT/fingerprint and B/D TD. 15,044.0 15,044.0 14:15 14:45 11/7/2016 11/7/2016 1.25 PROD2 DRILL FIT T OH FIT to 11.5 ppg EMW with 8.8 ppg 15,044.0 15,044.0 14:45 16:00 and 1035 psi back pressure. pressure held. 11/7/2016 11/8/2016 8.00 PROD2 DRILL OWFF T Performed fingerprint, drawing down 3 15,044.0 15,044.0 16:00 00:00 times. Bleed pressure to 429 psi (1 bbl) and built back to 448 psi in 16 min. Bleed back down to 359 psi (1bbl) and built back up to 439 psi in 90 min. Bleed down to 0 psi (2.5bbl) and build back up to 400 psi in 5.5 hr as of midnight. 11/8/2016 11/8/2016 10.50 PROD2 DRILL OWFF T Cont. to monitor pressure increase 15,044.0 15,044.0 00:00 10:30 f/401 psi to 579 psi. (Decision made to increase mud wt from 8.8 ppg to 10.8 ppg) 11/8/2016 11/8/2016 1.50 PROD2 DRILL MPDA T Fill chokes. Equalize pressure on 15,044.0 15,044.0 10:30 12:00 choke manifold. R/D circ swedge & M/U top drive. Equalize pressures. Stage up on mud pumps to 6 bpm & equalize pressures thru MPD equipment. Open top pipe rams & circulate thru MPD chokes. 11/8/2016 11/9/2016 12.00 PROD2 DRILL CIRC T Wt up from 8.8 ppg to 10.3 ppg w/6 15,044.0 15,044.0 12:00 00:00 bpm @ .3 ppg increments. Holding back pressure to maintain ECD's @ 10.5 ppg until 9.7 ppg in/out, then chokes 100% open. Rotating 60 rpm @ 8 k ft/lbs torque. As of midnight 10.3 ppg In & 10.0 ppg Out 11/9/2016 11/9/2016 6.50 PROD2 DRILL CIRC T Wt up from 10.3 ppg to 10.5 ppg w/6 15,044.0 15,044.0 00:00 06:30 bpm, 3210 - 3260 psi, 60 rpm, 8 k trq 11/9/2016 11/9/2016 0.75 PROD2 DRILL OWFF T OWFF. Close MPD chokes & monitor 15,044.0 15,044.0 06:30 07:15 psi for 10 min = 0 psi increase. Open chokes & monitor returns in cellar for 30 min (static) Page 55/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) ,a CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/9/2016 11/9/2016 3.75 PROD2 DRILL CIRC T Wt up from 10.5 ppg to 10.8 ppg w/6 - 15,044.0 15,044.0 07:15 11:00 5 bpm, 3050 - 2120 psi, 60 - 30 rpm, 8 k trq 11/9/2016 11/9/2016 0.25 PROD2 DRILL OWFF T OWFF. Close MPD chokes & monitor 15,044.0 15,044.0 11:00 11:15 psi = 0 psi increase. Open chokes & monitor returns in cellar (static) 11/9/2016 11/9/2016 0.25 PROD2 DRILL CIRC T SPR's 15,044.0 15,044.0 11:15 11:30 11/9/2016 11/9/2016 3.25 PROD2 DRILL REAM T Wash in hole w/2 bpm f/15,044' to 15,044.0 15,901.0 11:30 14:45 15,186' (tight hole @ 15,186') W&R f/15,186' to 15,901'w/4.6 bpm, 1850 psi, 50 rpm, 7.5 - 9 k trq 11/9/2016 11/9/2016 1.00 PROD2 DRILL SMPD T RIH on elevators f/15,901' to TD of 15,901.0 16,821.0 14:45 15:45 16,821' 11/9/2016 11/9/2016 3.25 PROD2 DRILL CIRC T Circ out light mud & wt up to 10.8 ppg 16,821.0 16,821.0 15:45 19:00 w/4.5 bpm, 2210 - 2340 psi, 50 rpm, 7.5 - 9 k trq. Maintain ECD's <11.6 ppg. SPR's. Lightest mud seen = 9.5 ppg, max gas = 602 units 11/9/2016 11/9/2016 3.50 PROD2 DRILL PMPO T Pump OOH f/16,821' to 15,044' w/4.5 16,821.0 15,044.0 19:00 22:30 bpm, 2200 psi. (Dropped 2.11" hollow drift) 11/9/2016 11/9/2016 0.50 PROD2 DRILL OWFF T OWFF. Monitor returns in cellar 15,044.0 15,044.0 22:30 23:00 (static) SIMOPS - PJSm on RCD bearing 11/9/2016 11/10/2016 1.00 PROD2 DRILL MPDA T Pull RCD bearing & install trip nipple 15,044.0 15,044.0 23:00 00:00 11/10/2016 11/10/2016 9.25 PROD2 DRILL PMPO T Pump OOH f/15,044' to 7,911' w/3 - 4 15,044.0 7,911.0 00:00 09:15 bpm 11/10/2016 11/10/2016 0.25 PROD2 DRILL OWFF T F/C (Slight drop) 7,911.0 7,911.0 09:15 09:30 11/10/2016 11/10/2016 8.00 PROD2 DRILL PMPO T Pump OOH f/7,911' to 1,809'w/4 bpm 7,911.0 1,809.0 09:30 17:30 11/10/2016 11/10/2016 2.00 PROD2 DRILL TRIP T POOH on elevators f/1,809' to 308' 1,809.0 308.0 17:30 19:30 11/10/2016 11/10/2016 0.50 PROD2 DRILL OWFF T F/C (Static) SIMOPS - PJSM on BHA 308.0 308.0 19:30 20:00 11/10/2016 11/10/2016 2.00 PROD2 DRILL BHAH T L/D BHA as per SLB (Rack back 1 308.0 0.0 20:00 22:00 stand HWDP & Jars) 11/10/2016 11/10/2016 0.25 PROD2 DRILL BHAH T Clean & clear floor 0.0 0.0 22:00 22:15 11/10/2016 11/10/2016 1.00 PROD2 DRILL BOPE T Pull wear ring & set test plug. R/U to 0.0 0.0 22:15 23:15 test upper pipe rams. 11/10/2016 11/11/2016 0.75 PROD2 DRILL BOPE T Test BOP w/4" test joint. Upper rams, 0.0 0.0 23:15 00:00 HCR choke & kill, 4" FOSV, Choke valves 1,3,5,& 6 to 250/3500 psi for 5 min (good). Draw down on super choke to 1100 psi. 11/11/2016 11/11/2016 1.00 PROD2 DRILL BOPE T R/D testing equipment. B/D lines. 0.0 0.0 00:00 01:00 FMC set 7.125" wear ring. 11/11/2016 11/11/2016 1.50 PROD2 DRILL RURD T Clean & clear floor. R/U casing tongs 0.0 0.0 01:00 02:30 & 4 1/2" elevators. Organize ECP running order in pipe shed. 11/11/2016 11/11/2016 1.50 PROD2 DRILL PUTB T M/U ECP packer assembly as per 0.0 313.0 02:30 04:00 baker rep to 313'(3 Baker ECP packers & 2 TM swell packers) 11/11/2016 11/11/2016 0.25 PROD2 DRILL RURD T C/O elevators to 4" DP elevators. 313.0 313.0 04:00 04:15 j Page 56/73 Report Printed: 12/1/2016 r Operations Summary (with Timelog Depths) "ry CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (fhKB) End Depth (WB) 11/11/2016 11/11/2016 0.25 PROD2 DRILL RUNL T RIH w/1 stand 4" DP to 404' 313.0 404.0 04:15 04:30 11/11/2016 11/11/2016 0.25 PROD2 DRILL CIRC T Breac circulation 2 bpm @ 80 psi, 3 404.0 404.0 04:30 04:45 bpm @ 100 psi, 4 bpm @ 140 psi 11/11/2016 11/11/2016 18.25 PROD2 DRILL RUNL T RIH ECP packer assembly f/404'to 404.0 15,779.0 04:45 23:00 15,779' (no issues running packers thru window) Torque & drag data TOW @ 15,049' PU wt 210 k / SO wt 130 k 11/11/2016 11/11/2016 0.25 PROD2 DRILL RUNL T Drop 1.25" ball & RIH f/15,779'to 15,779.0 15,797.0 23:00 23:15 15,797' 11/11/2016 11/12/2016 0.75 PROD2 DRILL CIRC T Pump down ball w/1.7 bpm @ 620 psi 15,797.0 15,797.0 23:15 00:00 11/12/2016 11/12/2016 0.75 PROD2 DRILL CIRC T Pump down ball w/1.7 bpm @ 610 psi. 15,797.0 15,797.0 00:00 00:45 1300 stks reduce flow rate to 1 bpm @ 490 psi. Ball on seat 1373 stks (calculated 1661 stks). Pressure up to 600 psi. Pressure will not hold. Pressure up to 650 psi pressure not holding. Turn over to Dowell. 11/12/2016 11/12/2016 0.75 PROD2 DRILL PACK T Dowell flood lines & pressure test to 15,797.0 15,797.0 00:45 01:30 4000 psi (good). Made 5 attempts increasing pressure from 800 to 850 psi to attempt to shift WIV closed. Pressure will not hold. Suspect ball not sealing fully. WIV not shifting closed. 11/12/2016 11/12/2016 0.75 PROD2 DRILL WAIT T Consult with town, drilling team & 15,797.0 15,797.0 01:30 02:15 Baker reps on plan forward. 11/12/2016 11/12/2016 2.75 PROD2 DRILL PACK T Attempt for 5 more times with Dowell 15,797.0 15,797.0 02:15 05:00 to set WIV. Pressure up to 950 psi max. No success. Consult with town. Work drill string. PU wt 225 k / SO wt 130 k. Make 2 more attempts with Dowell. No success. ( 13 total attempts to close WIV) Establish circ rate with Dowell 0.3 bpm @ 377 psi. Decision made to drop 2nd ball 1.5" 11/12/2016 11/12/2016 4.25 PROD2 DRILL CIRC T Drop 2nd 1.5" ball & circ down with .7 15,797.0 15,797.0 05:00 09:15 - 1 bpm @ 650 psi. Calculated strokes to bump 1661 stks. Ball did not appear to seat. Work drill string every hour. Cont to consult with town on plan forward. Continuously change parameters to get ball to seat. At 2302 stks observed pressure increase w/1 bpm from 550 psi to 720 psi. Ball appear to be seated. More differential but still not holding pressure. 11/12/2016 11/12/2016 0.25 PROD2 DRILL PACK T Increase pump rate to pressure up to 15,797.0 15,797.0 09:15 09:30 1460 psi & observe WIV shift closed. Shut down pump immediately, 1590 psi & observe ECP packer # 1 inflate. Pressure stabilize @ 1210 psi. Bleed off pressure & turn over to Dowell. Page 57/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/12/2016 11/12/2016 2.00 PROD2 DRILL PACK T Dowell inflate ECP packers as per 15,797.0 15,500.0 09:30 11:30 Baker rep. Dowell pressure up to 500 psi & let pressure stabilize. Increase pressure to 1850 & inflate ECP #2. Bleed back to 400 psi & gain 1.25 bbl fluid. Dowell increase pressure to 2000 psi & inflate ECP #3. Bled back to 1800 psi & could not confirm shear or packer inflating. Increase pressure to 2400 psi. & packer set. Once packers set all pressure bled off to zero to close valve in packers. Increase pressure to 3020 psi to hydraulic disconnect & release from ECP's 11/12/2016 11/12/2016 3.00 PROD2 DRILL CIRC T Circ & cond mud to 10.8 ppg with 3 - 15,500.0 15,500.0 11:30 14:30 4.5 bpm, 940 - 1440 psi. Minimum mud wt out 10.3 ppg & max mud wt out 12.2 ppg. 11/12/2016 11/12/2016 1.00 PROD2 DRILL PMPO T Pump OOH w/4 bpm (/15,500' to 15,500.0 15,038.0 14:30 15:30 15,038' 11/12/2016 11/12/2016 0.75 PROD2 DRILL MPDA T PJSM. Pull trip nipple & install RCD 15,038.0 15,038.0 15:30 16:15 bearing. 11/12/2016 11/12/2016 4.00 PROD2 DRILL CIRC T Circulate & cut mud wt from 10.8 ppg 15,038.0 15,038.0 16:15 20:15 to 8.8 ppg as per back pressure schedule. 230 - 290 gpm, 1680 - 2460 psi 11/12/2016 11/12/2016 2.00 PROD2 DRILL OWFF T Perform negative pressure test. Shut 15,038.0 15,038.0 20:15 22:15 down pumps & trap 500 psi. Let pressure stabilize. Bleed off pressure to 285 psi (.75 bbls gain in TT) Monitor pressure for 5 min Pressure decrease from 285 to 281 psi. Open chokes and bleed off pressure to zero. (4 bbls gain in TT for 4.75 bbls total) @ 20:30 hrs shut in chokes & monitor psi. Pressure increasing: 20:30 = 5 psi 20:45 = 63 psi 21:00 = 132 psi 21:15 = 193 psi 21:30 = 219 psi 21:45 = 241 psi 22:00 = 255 psi 22:30 = 275 psi 11/12/2016 11/12/2016 0.25 PROD2 DRILL OWFF T Perform breathing test. Open up 15,038.0 15,038.0 22:15 22:30 chokes & bleed off pressure for 10 min. Gained 1 bbl 11/12/2016 11/13/2016 1.50 PROD2 DRILL OWFF T Shut in chokes and monitor psi. 15,038.0 15,038.0 22:30 00:00 22:51 = 6 psi initial 23:21 = 129 psi 30 min 23:51 = 231 psi 1 hr (Decsion made to RIH to TD of 15,500' and wt up to 10.8 ppg) 11/13/2016 11/13/2016 0.50 PROD2 DRILL MPDA T Line up MPD equipment to strip in 15,038.0 15,038.0 00:00 00:30 hole 11/13/2016 11/13/2016 0.50 PROD2 DRILL SMPD T Strip in hole holding 500 psi back 15,038.0 15,481.0 00:30 01:00 pressure (/15,038' to 15,481' 11/13/2016 11/13/2016 4.00 PROD2 DRILL CIRC T Circ & wt up f/8.8 ppg to 10.8 ppg as 15,481.0 15,481.0 01:00 05:00 per back pressure schedule w/290 - 250 gpm. Page 58/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) 3 C D5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/13/2016 11/13/2016 1.25 PROD2 DRILL PMPO T Pump OOH w/5 bpm f/15,481' to 15,481.0 15,038.0 05:00 06:15 15,038' 11/13/2016 11/13/2016 0.50 PROD2 DRILL OWFF T F/C (static) 15,038.0 15,038.0 06:15 06:45 11/13/2016 11/13/2016 0.75 PROD2 DRILL PMPO T Pump OOH w/5 bpm f/15,038'to 15,038.0 14,562.0 06:45 07:30 14,562' 11/13/2016 11/13/2016 1.00 PROD2 DRILL CIRC T Circ & cond mud to aid in preventing 14,562.0 14,562.0 07:30 08:30 sag w/5.5 bpm @ 1640 psi. 11/13/2016 11/13/2016 10.50 PROD2 DRILL SMPD T Strip OOH as per MPD schedule 14,562.0 1,047.0 08:30 19:00 f/14,562' to 1,047' 11/13/2016 11/13/2016 0.25 PROD2 DRILL OWFF T F/C (static) SIMOPS - PJSM on 1,047.0 1,047.0 19:00 19:15 pulling RCD bearing. 11/13/2016 11/13/2016 0.75 PROD2 DRILL MPDA T Pull RCD bearing & install trip nipple. 1,047.0 1,047.0 19:15 20:00 11/13/2016 11/13/2016 0.50 PROD2 DRILL TRIP T POOH f/1047'to 16' 1,047.0 16.0 20:00 20:30 11/13/2016 11/13/2016 0.50 PROD2 DRILL BHAH T L/D SLB stabilizer & Baker hydraulic 16.0 0.0 20:30 21:00 release tool. 11/13/2016 11/13/2016 1.00 COMPZ2 FISH BHAH P Clean & clear floor. Bring Baker 0.0 0.0 21:00 22:00 whipstock retrieval tools to rig floor. 11/13/2016 11/13/2016 1.50 COMPZ2 FISH BHAH P M/U Baker whipstock retrieval BHA to 0.0 365.0 22:00 23:30 365' 11/13/2016 11/14/2016 0.50 COMPZ2 FISH TRIP P RIH f/365'to 1,208' 365.0 1,208.0 23:30 00:00 11/14/2016 11/14/2016 0.75 COMPZ2 FISH TRIP P RIH (/1,208' to 2,244' 1,208.0 2,244.0 00:00 00:45 11/14/2016 11/14/2016 0.75 COMPZ2 FISH DHEQ P Shallow hole test MWD w/230 gpm 2,244.0 2,244.0 00:45 01:30 1190 psi. No good. Cycle pumps several times in an attempt for good test. No success. Decision made to POOH to trouble shoot MWD 11/14/2016 11/14/2016 0.75 COMPZ2 FISH PMPO T Pump OOH w/5 bpm f/2,244'to 1,773'. 1,773.0 1,773.0 01:30 02:15 MWD starting to show life. 11/14/2016 11/14/2016 0.25 COMPZ2 FISH DHEQ T Shallow hole test MWD w/230 gpm 1,773.0 1,773.0 02:15 02:30 1190 psi. No good. 11/14/2016 11/14/2016 1.50 COMPZ2 FISH TRIP T POOH on elevators on TT f/1,773'to 1,773.0 75.0 02:30 04:00 75' 11/14/2016 11/14/2016 0.25 COMPZ2 FISH DHEQ T Trouble shoot MWD tool. Plug in and 75.0 75.0 04:00 04:15 re -program. Inspect MWD for debris. 11/14/2016 11/14/2016 0.75 COMPZ2 FISH TRIP T RIH f/75'to 1,770' 75.0 1,770.0 04:15 05:00 11/14/2016 11/14/2016 0.50 COMPZ2 FISH DHEQ T Shallow hole test MWD w/251 gpm 1,770.0 1,770.0 05:00 05:30 1450 psi. (good) 11/14/2016 11/14/2016 13.00 COMPZ2 FISH TRIP P RIH (/1,770 to 14,910' (fill pipe every 1,770.0 14,910.0 05:30 18:30 20 stds) 11/14/2016 11/14/2016 2.50 COMPZ2 FISH CIRC P Circ & cond 10.8 ppg mud w/230 gpm, 14,910.0 14,910.0 18:30 21:00 2740 psi. Minimum mud wt out 10.3 ppg & Man mud wt out 11.6 ppg. 11/14/2016 11/14/2016 1.00 COMPZ2 FISH SLPC P Slip & cut 83' drill line. 14,910.0 14,910.0 21:00 22:00 11/14/2016 11/14/2016 0.75 COMPZ2 FISH SVRG P Service rig & calibrate block height 14,910.0 14,910.0 22:00 22:45 11/14/2016 11/14/2016 0.25 COMPZ2 FISH OWFF P F/C (static). SIMOPS - PJSM on RCD 14,910.0 14,910.0 22:45 23:00 bearing. 11/14/2016 11/14/2016 0.75 COMPZ2 FISH MPDA P Remove trip nipple & install RC D 14,910.0 14,910.0 23:00 23:45 bearing. Page 59/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/14/2016 11/15/2016 0.25 COMPZ2 FISH WASH P Wash in hole w/230 gpm @ 2660 psi. 14,910.0 14,928.0 23:45 00:00 11/15/2016 11/15/2016 1.00 COMPZ2 FISH WASH P Wash down from 14,928' MD to 14,928.0 15,006.0 00:00 01:00 15,006' MD @ 230 gpm, 2650 psi. Locate RA tag @ 14,947' MD bit depth. 11/15/2016 11/15/2016 0.75 COMPZ2 FISH WASH P Wash down to 15,101' MD 230 gpm, 15,006.0 15,101.0 01:00 01:45 2650 psi. Orient and line up tool face to wash slide 160R. 11/15/2016 11/15/2016 0.50 COMPZ2 FISH WASH P Wash down to 15,133' MD, 230-260 1.5,101.0 15,133.0 01:45 02:15 gpm, 2760-3130 psi. P/U=210k, S/0=125k. 11/15/2016 11/15/2016 0.75 COMPZ2 FISH FISH P Line up tool face 10L and attempt to 15,133.0 15,121.0 02:15 03:00 hook whipstock assy. Tool face walked to 1OR. 11/15/2016 11/15/2016 1.00 COMPZ2 FISH FISH P Line up tool face to 24L and hook 15,121.0 15,231.0 03:00 04:00 whipstock assy with 8k down @ 15121' MD. P/U 250k to confirm whipstock is hooked. Bleed jars and P/U to 265k, S/O to 115k to cock jars. P/U 275k and fire jars, P/U to 300k. S/O again to 115k to cock, P/U to 300k and fire. P/U to 325k and observe drag, pulling up hole. S/O to 115k and observe 2' higher in hole. Repeat jar action and P/U 310k and observe movement. After 5 jars cycles, confirm fish engaged, P/U 225k, 260-200 gpm, 2860-1730 psi. Pull up to 15,231' MD. 11/15/2016 11/15/2016 0.25 COMPZ2 FISH PMPO P Pump out from 15,231' MD to 15,180' 15,231.0 15,180.0 04:00 04:15 MD, 200 gpm, 1730 psi. 11/15/2016 11/15/2016 1.00 COMPZ2 FISH OWFF P OWFF. Line up, shut in and monitor 15,180.0 15,180.0 04:15 05:15 pressure on MPD chokes. 0 psi. Line up and pump across top of hole via MPD, observe 3 bph static loss rate. 11/15/2016 11/15/2016 6.75 COMPZ2 FISH SMPD P Strip out of hole with MPD from 15,180.0 8,111.0 05:15 12:00 15,180' MD to 8,111' MD per stripping schedule. Holding 190-150 psi annular pressure pulling and 40-20 psi in slips. P/U= 148k @ 8,111' MD. *No slack off while pulling whipstock.* OA pressure @ 11:00 hrs= 230 psi. 11/15/2016 11/15/2016 7.75 COMPZ2 FISH SMPD P Continue stripping out with MPD from 8,111.0 566.0 12:00 19:45 8,111' MD to 566' MD, holding 150 psi pulling and 20 psi in slips. 11/15/2016 11/15/2016 0.25 COMPZ2 FISH OWFF P Shut down pump, line up MPD to flow 566.0 566.0 19:45 20:00 check, static. Blow down top drive. 11/15/2016 11/15/2016 0.75 COMPZ2 FISH MPDA ve RCD element and install trip 566.0 566.0 20:00 20:45 I r---TR�emc 1 nipple per MPD rep. 11/15/2016 11/15/2016 0.75 COMPZ2 FISH TRIP P Trip out from 566' MD to 201' MD to 566.0 201.0 20:45 21:30 1 whipstock hook assy. Page 60/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/15/2016 11/16/2016 2.50 COMPZ2 FISH BHAH P PJSM and lay down whipstock 201.0 0.0 21:30 00:00 retrieval hook assy (observed wash nozzle missing from hook), whipstock BHA assy to locator sub. Calc Disp=87 bbl, Actual Disp=127 bbl. OA pressure @ 22:00 hrs=120 psi. No damage to whipstock assy, observed some sag material below debris cup to locator assy. 11/16/2016 11/16/2016 1.00 COMPZ2 FISH BHAH P Clean and clear rig floor, lay down 0.0 0.0 00:00 01:00 whipstock and tools via beaverslide. 11/16/2016 11/16/2016 1.75 COMPZ2 WELLPR BHAH P P/U cleanout assembly BHA 0.0 0.0 01:00 02:45 components via beaverslide. Lay down 1 stand NM flex collars, lay down jar stand, (Jars and HWDP) via mousehole. Change out elevators from 4" to 3%" for EUE mule shoe. 11/16/2016 11/16/2016 1.50 COMPZ2 WELLPR BHAH P PJSM, M/U Baker cleanout assembly 0.0 373.0 02:45 04:15 per BOT fishing rep to 373' MD. Static loss rate 1 bph. 11/16/2016 11/16/2016 7.75 COMPZ2 WELLPR TRIP P RIH with cleanout assembly from 373' 373.0 10,373.0 04:15 12:00 MD to 10,373' MD, flilling pipe every 20 stands. P/U=157k, S/O=120k @ 10,373'. Note- String took 30k down weight @ 4085'. Picked up and wiped, P/U=105k, S/O=100k nothing there. Suspect nozzle from retrieval hook hung up on locator. Did not see it again. OA pressure @ 11:00 hrs=40 psi. 11/16/2016 11/16/2016 5.50 COMPZ2 WELLPR TRIP P Continue RIH with cleanout assy from 10,373.0 15,110.0 12:00 17:30 10,373' MD to 15,110' MD, filling pipe every 20 stands. 11/16/2016 11/16/2016 2.00 COMPZ2 WELLPR REAM P Obtain P/U=210k, S/O=130k. Wash 15,110.0 15,205.0 17:30 19:30 down @ 4 bpm 1160 psi from 15,110' MD to 15,188' MD observe 5k drag. Mills past window @ 15,188' MD, appears to be material piling up below locator. P/U to 15,133' MD, 20 rpm 7.5k Tq, ROT=157k. Increase pump rate to 6 bpm 2300 psi, ream down to 15,195' MD, briefly observe 3-10k reduction in string weight and 2-3k increase in torque and mills pass window. Back ream to 15,135' MD, S/D rotary and drift down to 15,195' no issues, then appear to be pushing fill. Continue washing down to 15,205' MD to make connection, string weight returning to 135k. 11/16/2016 11/16/2016 0.50 COMPZ2 WELLPR WASH P Wash down from 15,205' MD @ 2 15,205.0 15,265.0 19:30 20:00 bpm, 630 psi to 15,265' MD mule shoe depth. No-go @ 15,229' with 5k, P/U and verify with 10k down weight. Page 61/73 Report Printed: 12/1/2016 ' Operations Summary (with Timelog Depths) i CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/16/2016 11/16/2016 3.50 COMPZ2 WELLPR CIRC P P/U to 15,255' MD and circulate 15,265.0 15,255.0 20:00 23:30 bottoms up 250 gpm, 2150 psi. Pump Hi Vis sweep around and prepare for brine displacement. Observe shakers for junk while pumping, no junk observed. Reciprocate pipe 20' every 10 minutes, keeping 3'/z' mule shoe inside SBE. Pumped total 2.5 bottoms up, 11,600 stks. Observe some sag, lightest mud out 10.4 ppg, heaviest 11.6 ppg. OA pressure @ 23:00 hrs=100 psi 11/16/2016 11/17/2016 0.50 COMPZ2 WELLPR DISP P PJSM and begin displacement from 15,255.0 15,255.0 23:30 00:00 10.8 ppg MOBM to 10.8 ppg NaCl/NaBr brine. Pumped 40 bbl Hi Vis lead spacer from pill pit, 65 bbl 10.8 ppg transition spacer from truck, 6 bpm 2150 psi. 11/17/2016 11/17/2016 2.00 COMPZ2 WELLPR DISP P Continue displacing well to 10.8 ppg 15,255.0 15,225.0 00:00 02:00 NaCl/NaBr brine, pump 30 bbl tail spacer #3, followed by 635 bbl 10.8 ppg brine @ 5.8 bpm, 1430 psi. Track volume pumped vs volume returned throughout displacement, lost 15 bbl during displacement. Lead spacer interface showed up 100 bbl early and was very strung out due to no pipe rotation. No surface issues with handling interface mixture. Reciprocate pipe 20' every 10 minutes keeping mule shoe in SBE. 11/17/2016 11/17/2016 1.25 COMPZ2 WELLPR CRIH P Pump 153.3 bbl corrosion inhibited 15,225.0 15,110.0 02:00 03:15 brine @ 6 bpm, displace with 120 bbl neat 10.8 ppg brine, clean brine returns to pits while pumping inhibitor. Racked back (pumped out) two stands to 15,110' during displacement to get locator assy above window. P/U=220k, S/O=125k. Blow down top drive. 11/17/2016 11/17/2016 0.50 COMPZ2 WELLPR OWFF P Flow check well for 30 minutes, static. 15,110.0 15,110.0 03:15 03:45 No drop or rise. SIMOPS- Clean out under shakers and troughs. PJSM on pulling trip nipple and installing RCD. 11/17/2016 11/17/2016 0.50 COMPZ2 WELLPR MPDA P Pull trip nipple and install RCD bearing 15,110.0 15,110.0 03:45 04:15 assy. 11/17/2016 11/17/2016 0.25 COMPZ2 WELLPR CIRC P Obtain new SPR's with 10.8 ppg brine 15,110.0 15,110.0 04:15 04:30 and bearing installed, blow down top d rive. 11/17/2016 11/17/2016 8.25 COMPZ2 WELLPR SMPD P Strip out of hole with MPD from 15,110.0 8,490.0 04:30 12:45 15,110' MD to 8,490' MD holding 120 psi AP pulling and 20 psi in slips. Good fill. P/U=165k, S/O=110k. 11/17/2016 0.25 COMPZ2 WELLPR OWFF P Shut down pump and flow check well, 8,490.0 8,490.0 111/17/2016 12:45 13:00 1 static. Page 62/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) u S4 CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/17/2016 11/17/2016 7.75 COMPZ2 WELLPR SMPD P Continue strip out of hole with MPD 8,490.0 930.0 13:00 20:45 from 8,490' MD to 930' MD holding 120 psi AP pulling and 20 psi in slips. Good fill. 11/17/2016 11/17/2016 0.25 COMPZ2 WELLPR OWFF P Shut down pump and flow check well 930.0 930.0 20:45 21:00 10 minutes static. 11/17/2016 11/17/2016 1.00 COMPZ2 WELLPR MPDA P PJSM, flush MPD chokes with water 930.0 930.0 21:00 22:00 and blow down. Remove RCD element and install trip nipple. 11/17/2016 11/17/2016 0.75 COMPZ2 WELLPR PULD P POOH from 936' MD to 464' MD 930.0 464.0 22:00 22:45 laying down 4" DP. OA pressure @ 22:00 hrs=50 psi 11/17/2016 11/18/2016 1.25 COMPZ2 WELLPR BHAH P POOH and lay down HWDP, Baker 464.0 65.0 22:45 00:00 Cleanout BHA to 65' MD. Lay down 3'/z' EUE mule shoe joint in mouse hole. Calc Disp=88.4 bbl, Actual Disp=108 bbl. 11/18/2016 11/18/2016 0.50 COMPZ2 WELLPR SVRG P Service rig, top drive, draw works.. 65.0 65.0 00:00 00:30 11/18/2016 11/18/2016 1.00 COMPZ2 WELLPR BHAH P PJSM and lay down remaining BHA 65.0 0.0 00:30 01:30 #13 per Baker rep. 11/18/2016 11/18/2016 2.00 COMPZ2 WELLPR WWWH P PJSM, latch up stand 4" DP, lay down 0.0 0.0 01:30 03:30 2 joints. M/U stack washer and XT39 BOT string magnet to flush stack. Flush stack with 12-15 bpm, 70 psi, 20 rpm. Pull and clean magnet (25% loaded), lay down stack wash assembly. Blow down top drive and mud line. SIMOPS- Pull 90' mousehole for modification. 11/18/2016 11/18/2016 1.50 COMPZ2 WHDBOP RURD P Pull wear ring, set test plug with 4%" 0.0 0.0 03:30 05:00 test joint. Fill stack, choke/kill line and choke manifold. Rig up to test. 11/18/2016 11/18/2016 4.00 COMPZ2 WHDBOP BOPE P Test BOPE with 4%" test joint, 0.0 0.0 05:00 09:00 AOGCC Matt Herrera witnessed test. Tested annular, UPR, LPR, choke manifold valves #1-14, needle valve above #1, 4" Demco kill, Auto and manual IBOP, 4" FOSV and Dart, HCR choke and kill, Manual choke and kill on stack. Performed all tests to 250/3500 psi 5 min each charted. (annular to 250/2500 psi). Electrician tested gas alarms and PVT alarms. 11/18/2016 11/18/2016 1.75 COMPZ2 WHDBOP BOPE P Change to 3'/2'test joint, test annular 0.0 0.0 09:00 10:45 to 250/2500 psi, UPR and LPR to 250/3500 psi. Back out landing joint. 11/18/2016 11/18/2016 0.25 COMPZ2 WHDBOP BOPE P Perform accumulator test. System 0.0 0.0 10:45 11:00 pressure=3000 psi, Pressure after closing=1500 psi, 200 psi attained=25 sec, full system recovery=143 sec. 4 bottle N2 average=2050 psi. 11/18/2016 11/18/2016 0.75 COMPZ2 WHDBOP BOPE P Test blind rams to 250/3500 psi. Test 0.0 0.0 11:00 11:45 manual and super auto choke to 1100 psi. Page 63173 Report Printed: 12/1/2016 ?..4 Operations Summary (with Timelog Depths) CD5-99 yo,c Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/18/2016 11/18/2016 0.75 COMPZ2 WHDBOP RURD P Blow down choke manifold, choke and 0.0 0.0 11:45 12:30 kill lines. Rig down test equipment. Pull test plug, lay down test joint. Install 9" ID retrievable wear ring per FMC. OA pressure @ 12:00 hrs=75 psi 11/18/2016 11/18/2016 2.00 COMPZ2 RPCOMP RURD P Clear rig floor, lay down tools. P/U 0.0 0.0 12:30 14:30 tubing running tools, SLB tool box, TEC line spool, hang sheave. Install mousehole and P/U cannon clamps. 11/18/2016 11/18/2016 3.50 COMPZ2 RPCOMP PUTB P PJSM on running completion. P/U 0.0 737.0 14:30 18:00 WLEG, locator assy, X nipple, HES TNT packer, 16 jts 3'/2' TN110, X nipple, HES TNT packer, XO to EUE- 8rd, P/U SLB gauge carrier per detail to 737' MD. 11/18/2016 11/18/2016 1.00 COMPZ2 RPCOMP OTHR P SLB connect TEC wire to guage 737.0 737.0 18:00 19:00 carrier @ 737' MD and test connection to 5000 psi. 11/18/2016 11/19/2016 5.00 COMPZ2 RPCOMP PUTB P Continue picking up and running 3'/2" 737.0 3,114.0 19:00 00:00 9.3# L-80 EUE-8rd Mod, 1 KBMG GLM WSOV, securing TEC wire with 1 Cannon clamp over each coupling, test TEC wire every 2,000'. Run completion to 3,114' MD. Install Cavins air slips with side roller @ 1,200'. Good displacement, <1bph losses. OA pressure @ 22:00 hrs=40 psi. 11/19/2016 11/19/2016 12.00 COMPZ2 RPCOMP PUTB P Continue picking up and running 3'/i' 3,114.0 9,593.0 00:00 12:00 9.3# L-80 EUE-8rd Mod, with GLM's, securing TEC wire with 1 Cannon clamp over each coupling, test TEC wire every 2,000'. Run completion from 3,114' MD to 9,583' MD. Good displacement, <1bph losses. S/O @ 9,593' MD=95k. OA pressure @ 11:00 hrs=10 psi. 11/19/2016 11/19/2016 9.50 COMPZ2 RPCOMP PUTB P Continue picking up and running 3'/2' 9,593.0 14,473.0 12:00 21:30 9.3# L-80 EUE-8rd Mod, with GLM & X nipple, securing TEC wire with 1 Cannon clamp over each coupling, test TEC wire every 2,000'. Run completion from 9,593' MD to 14,473' MD. Good displacement, <1 bph losses. S/O @ 14,473' MD=105k. 11/19/2016 11/19/2016 1.25 COMPZ2 RPCOMP OTHR P Flow check static. Line up to fill tubing, 14,473.0 14,473.0 21:30 22:45 observe U-tube. Drop 1-5/16" ball/rod with baited sub. Fill pipe, allow ball/rod to drop for 45 minutes. 11/19/2016 11/20/2016 1.25 COMPZ2 RPCOMP PUTB P Continue picking up and running 3%2' 14,473.0 14,977.0 22:45 00:00 9.3# L-80 EUE-8rd Mod, securing TEC wire with 1 Cannon clamp over each coupling. Run completion from 14,473' MD to 14,977' MD. Good displacement, <1bph losses. OA pressure @ 22:00 hrs=10 psi. Page 64/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) C D5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/20/2016 11/20/2016 1.00 COMPZ2 RPCOMP PUTB P Continue RIH with 3'/" EUE tubing 14,977.0 15,255.0 00:00 01:00 from 14,473' MD to 15,255' MD as per detail. P/U=144k, S/0=103k. (Picking upjts 480,481,482 and 483 to locate). Observe shear out of locator sub @ 6k down, fully no-go with 15k down. 11/20/2016 11/20/2016 1.00 COMPZ2 RPCOMP HOSO P Lay down 4 jts 3'/z' EUE from 15,255' 15,255.0 15,156.0 01:00 02:00 MD to 15,156' MD to P/U space out pups. OWFF static. (joints pulled wet indicating ball on seat) 11/20/2016 11/20/2016 1.25 COMPZ2 RPCOMP HOSO P Make up space out pups, 6.18', 10.19', 15,156.0 15,220.0 02:00 03:15 10.26', XO to 4%" TXP, 1 joint TXP. M/U landing joint "B". 11/20/2016 11/20/2016 0.50 COMPZ2 RPCOMP RURD P M/U wear ring retrieval tool, latch in 15,220.0 15,220.0 03:15 03:45 and retrieve wear ring. 11/20/2016 11/20/2016 0.50 COMPZ2 RPCOMP THGR P L/D landing joint "B", P/U landing joint 15,220.0 15,220.0 03:45 04:15 "A". Make up hanger and orient. 11/20/2016 11/20/2016 1.00 COMPZ2 RPCOMP THGR P Terminate TEC wire through hanger, 15,220.0 15,220.0 04:15 05:15 pressure test port to 5000 psi 10 minutes witnessed. 11/20/2016 11/20/2016 0.75 COMPZ2 RPCOMP THGR P Land tubing hanger @ 15,252' WLEG 15,220.0 15,252.0 05:15 06:00 depth, RILDS per FMC rep. Test hanger seals to 5000 psi 10 minutes witnessed. 11/20/2016 11/20/2016 1.25 COMPZ2 RPCOMP RURD P Rig up to test tubing. Test surface 15,252.0 15,252.0 06:00 07:15 lines to 4,200 psi- good. 11/20/2016 11/20/2016 3.50 COMPZ2 RPCOMP PRTS P Pressured up the tubing to 4,100psi 15,252.0 0.0 07:15 10:45 observed pressure fluctuation at 2,100psi (initial packer setting pressure 1,800psi) and tested the tubing against the ball and rod on seat. Pressure fluctuating due to changing wind direction changing thermal properties. Finished tubing test and bled pressure down to 2,OOOpsi and blocked in. Lined up to pump on the IA with a hand monitoring the pressure on the OA (50psi). Pressured up on the IA and reached 2,900psi (Tubing tracked to 2,550psi) when there was a sudden loss of pressure on the IA coming down to 300psi and holding and the OA pressure was now at 700psi. Bled the IA down to Opsi and the OA pressure came down to 460psi. Notifications made. 11/20/2016 11/20/2016 2.25 COMPZ2 RPCOMP WAIT T Discuss plan forward with town. 0.0 0.0 10:45 13:00 SIMOPS- Clean and clear rig floor, work orders, P/U double stack tongs. 11/20/2016 11/20/2016 1.00 COMPZ2 RPCOMP PRTS T Circulate across top of IA with 20psi 0.0 0.0 13:00 14:00 on pump. Open OA(460psi) and bleed 2 bbls to the tote. Shut back in OA (440psi) Strap pill pit, 2bbls were pumped down the IA to the OA with minimal pump pressure verifying communication. Page 65/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/20/2016 11/20/2016 2.00 COMPZ2 RPCOMP ELNE T Continue clean and clear rig floor. R/D 0.0 0.0 14:00 16:00 testing equipment. Prepare for SLB E- Line to perform tubing cut @ -14,565' MD, midway on full joint below SLB gauge/ XO. 11/20/2016 11/20/2016 6.00 COMPZ2 RPCOMP ELNE T PJSM, Install 4%2' IBT x 3'/.' EUE XO 0.0 0.0 16:00 22:00 on landing joint for E-Line ROPE. Rig up E-Line sheave, BOPE, side entry pump in sub, lubricator/ grease head, hydraulic/ air and grease hoses. P/U weight bar and stab lubricator to BOPE. Establish well control monitoring strategy, release E-Line crew for rest. 11/20/2016 11/21/2016 2.00 COMPZ2 RPCOMP WAIT T Wait for E-Line crew due timed out. 0.0 0.0 22:00 00:00 R/U and monitor IA with trip tank, 0 gain/loss. Rig up HP hose and Tee to pump in sub, monitor tee for returns. OA pressure @ 22:00 hrs=410 psi. Continue to clean rig. 11/21/2016 11/21/2016 7.50 COMPZ2 RPCOMP WAIT T Monitor IA on trip tank, 0 gain/loss. 0.0 0.0 00:00 07:30 Continue to clean rig floor and perform work orders while waiting on SLB E- Line. 11/21/2016 11/21/2016 1.75 COMPZ2 RPCOMP ELNE T PJSM on M/U E-Line tools M/U Jet 0.0 31.0 07:30 09:15 cutter per SLB reps to 31'. 11/21/2016 11/21/2016 2.50 COMPZ2 RPCOMP ELNE T RIH with E-Line Jet Cutter to 14,500' 31.0 14,554.0 09:15 11:45 MD, correlate and CCL. Cutter on depth @ 14,554' MD. Monitor IA and tubing on trip tank. OA pressure @ 11:30 hrs=445 psi. 11/21/2016 11/21/2016 0.25 COMPZ2 RPCOMP ELNE T Perform jet cut @ 14,554' MD, monitor 14,554.0 14,554.0 11:45 12:00 returns through tubing. Gained 1 bbl while losing 1 bbl on trip tank indicating tubing was cut. 11/21/2016 11/21/2016 0.75 COMPZ2 RPCOMP ELNE T POOH with E-Line tools. 14,554.0 31.0 12:00 12:45 11/21/2016 11/21/2016 1.00 COMPZ2 RPCOMP ELNE T PJSM and rig down SLB cutter string, 31.0 0.0 12:45 13:45 rig down sheaves, BOPE and XO's. 11/21/2016 11/21/2016 0.75 COMPZ2 RPCOMP RURD T R/U tongs, install pup and TIW valve 0.0 14,554.0 13:45 14:30 on landing joint. 11/21/2016 11/21/2016 0.25 COMPZ2 RPCOMP PULL T With TIW and IA shut, pull 140k and 14,554.0 14,548.0 14:30 14:45 pull tibing / hanger free to 14,548' MD. 11/21/2016 11/21/2016 1.00 COMPZ2 RPCOMP OWFF T Open TIW and flow check well, static. 14,548.0 14,548.0 14:45 15:45 P/U thread protectors. 11/21/2016 11/21/2016 1.00 COMPZ2 RPCOMP PULL T Pull hanger to rig floor, 14,524' MD. 14,548.0 14,524.0 15:45 16:45 Disconnect TEC wire. L/D hanger and landing joint. 11/21/2016 11/21/2016 0.25 COMPZ2 RPCOMP PULL T Pull 4Y2' tubing joint to 14,483' MD. 14,524.0 14,483.0 16:45 17:00 Lay down and change out elevators to 3%2'. 11/21/2016 11/22/2016 7.00 COMPZ2 RPCOMP PULL T Pull and lay down 31/2' EUE-8rd mod 14,483.0 11,192.0 17:00 00:00 completion from 14,483' MD to 11,192' MD. Re-spooling TEC wire on reel. Removing cannon clamps for re-use. Replacing seal rings in EUE 8rd mod box ends in pipe shed. OA pressure @ 22:00 hrs=440 psi Page 66/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 11/22/2016 11/22/2016 12.00 COMPZ2 RPCOMP PULL T Continue pulliand lay down 3'/2' EUE- 11,192.0 2,779.0 00:00 12:00 8rd mod completion from 11,192' MD to 2,779' MD. Re -spooling TEC wire on reel. Removing cannon clamps for re -use. Replacing seal rings in EUE 8rd mod box ends in pipe shed. OA pressure @ 11:00 hrs 335 psi 11/22/2016 11/22/2016 3.75 COMPZ2 RPCOMP PULL T Finished pulling and L/D 3 1/5" EUE- 2,779.0 0.0 12:00 15:45 8rd tubing f/ 2,779' MD to surface. Re -spooled TEC wire, removed cannon clamps and replaced seal rings in EUE-8rd box ends. Joint # 17 was cut 9.49' down with a flared OD of 4". Calculated fill= 49.54 bbl, Act.= 51 bbl 11/22/2016 11/22/2016 0.50 COMPZ2 RPCOMP OWFF T Install Wear ring as per FMC, OWFF. 0.0 0.0 15:45 16:15 11/22/2016 11/22/2016 1.50 COMPZ2 RPCOMP RURD T L/D completion equipment and casing 0.0 0.0 16:15 17:45 tools. clean and clear rig floor. 11/22/2016 11/22/2016 0.75 COMPZ2 RPCOMP BHAH T PJSM and M/U Baker 7 5/8" left hand 0.0 40.0 17:45 18:30 set storm packer. RIH and pass the packer in to the 7 5/8" casing. 11/22/2016 11/22/2016 2.00 COMPZ2 RPCOMP TRIP T RIH on elevators to 1,825' MD 40.0 1,825.0 18:30 20:30 11/22/2016 11/22/2016 1.25 COMPZ2 RPCOMP PRTS T Set packer at 1,815' MD as per baker 1,825.0 1,825.0 20:30 21:45 rep, rotate left while P/U and slack off 10k. Closed top rams, opened Kill and pressured up the IA to 300 psi, pressure held and continued up to 3500 psi and held for 10 minutes. Bleed off and released packer. 11/22/2016 11/22/2016 0.75 COMPZ2 RPCOMP TRIP T RIH f/ 1,825'to 3,063' MD. 1,825.0 3,063.0 21:45 22:30 11/22/2016 11/22/2016 1.00 COMPZ2 RPCOMP PRTS T Set packer with 25k S/O at 3,052' MD. 3,063.0 3,063.0 22:30 23:30 Closed top rams, opened kill line and pressured up IA to 210 psi, observing pressure build up on the ON Opened top rams and lined up to pressure test down DP and below 3,052' MD. Pressured up 7 5/8" casing below 3,052' MD to 300 psi, observed no increase in IA and continued up to 3500 psi and held for 10 min. Bleed off and released packer. 11/22/2016 11/23/2016 0.50 COMPZ2 RPCOMP TRIP T POOH f/ 3,063' to 2,682' MD 3,063.0 2,682.0 23:30 00:00 1 1 I Page 67/73 Report Printed: 12/1/2016 ahON Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Star', Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/23/2016 11/23/2016 3.25 COMPZ2 RPCOMP PRTS T Continue isolating casing leak. Set 2,682.0 2,330.0 00:00 03:15 packer at 2,671' MD and tested up Ann, test failed. set packer at 2,386' MD and tested up Ann, test failed. Set packer at 2,291' MD and tested up Ann to 3500 psi, test held. Set packer at 2,355' MD and tested down DP, test good. Set packer at 2,322' MD and tested down DP, test failed. Tested up Ann and test held. Set packer at 2,345' MD and tested down DP to 3500 psi, test held. Set packer at 2,330' MD and tested down DP, test failed. Tested up Ann to 3500 psi and held for 10 min. 7 5/8" casing leak identified between 2,330' and 2,345' MD. 11/23/2016 11/23/2016 0.25 COMPZ2 RPCOMP OWFF T OWFF, B/D TD and Kill line. 2,330.0 2,330.0 03:15 03:30 11/23/2016 11/23/2016 1.25 COMPZ2 RPCOMP TRIP T POOH f/ 2,330' to 21' MD on 2,330.0 21.0 03:30 04:45 elevators. 11/23/2016 11/23/2016 0.25 COMPZ2 RPCOMP BHAH T L/D Baker packer assy, as per Baker 21.0 0.0 04:45 05:00 rep. 11/23/2016 11/23/2016 1.25 COMPZ2 RPCOMP ELOG T Remove MPD trip nipple and install 7" 0.0 0.0 05:00 06:15 Otis adapter and 10' Lubricator extension to rig floor. 11/23/2016 11/23/2016 2.50 COMPZ2 RPCOMP ELOG T PJSM, P/U and M/U sheaves and 0.0 0.0 06:15 08:45 double stripper head. Change out seals on Lub. extension. Pressure test packoffs to 500 psi, test held. 11/23/2016 11/23/2016 1.25 COMPZ2 RPCOMP ELOG T P/U and M/U casing caliper logging 0.0 0.0 08:45 10:00 tools as per SLB. 11/23/2016 11/23/2016 5.25 COMPZ2 RPCOMP ELOG T Run Caliper log from 6,000' MD to 0.0 0.0 10:00 15:15 surface at 150 ft/hr. Casing damage observed at -2,327' MD. 11/23/2016 11/23/2016 2.50 COMPZ2 RPCOMP ELOG T L/D caliper logging tools and P/U Gyro 0.0 0.0 15:15 17:45 logging tools as per SLB. 11/23/2016 11/24/2016 6.25 COMPZ2 RPCOMP ELOG T Gyro logging run f/ 6,800' MD to 0.0 0.0 17:45 00:00 surface. Logged past stage tool at 6,711' MD for depth correlation. 11/24/2016 11/24/2016 1.25 COMPZ2 RPCOMP ELOG T Finish logging Gyro to surface on e- 0.0 0.0 00:00 01:15 line and L/D. 11/24/2016 11/24/2016 1.25 COMPZ2 RPCOMP ELOG T M/U USIT logging assy as per SLB. 0.0 0.0 01:15 02:30 11/24/2016 11/24/2016 9.00 COMPZ2 RPCOMP ELOG T Run USIT log from 14,000' MD to 0.0 0.0 02:30 11:30 surface. 11/24/2016 11/24/2016 1.00 COMPZ2 RPCOMP ELOG T L/D USIT logging tools and R/D a -line 0.0 0.0 11:30 12:30 equipment. 11/24/2016 11/24/2016 1.00 COMPZ2 RPCOMP ELOG T R/D 7" Otis adapter, 10' lubricator 0.0 0.0 12:30 13:30 extension and double stripper head. Installed trip nipple in rotary head. 11/24/2016 11/24/2016 0.50 COMPZ2 RPCOMP BHAH T P/U Baker dressing tools to the rig 0.0 0.0 13:30 14:00 floor. 11/24/2016 11/24/2016 1.50 COMPZ2 RPCOMP SVRG T Cut & Slip 69' of drill line. serviced 0.0 0.0 14:00 15:30 TD, Drawworks, and calibrated block height. 11/24/2016 11/24/2016 1.50 COMPZ2 RPCOMP BHAH T M/U Baker 3 1/2" tubing dressing assy 0.0 52.0 15:30 17:00 I as per baker. Page 68/73 Report Printed: 12/1/2016 4 Operations Summary (with Timelog Depths) CD5-99 Y. Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 11/24/2016 11/25/2016 7.00 COMPZ2 RPCOMP TRIP T RIH f/ 52' to 10,682' MD. Singled in 52.0 10,682.0 17:00 00:00 on 78 jts of 14# 4" DP from the pipe shed, then continued on with 15.7# 4" DP stands from the derrick. 11/25/2016 11/25/2016 2.25 COMPZ2 RPCOMP TRIP T Continued RIH f/ 10,682' to 14,496' 10,682.0 14,496.0 00:00 02:15 MD on elevators. P/U= 219k, S/0= 129k. 11/25/2016 11/25/2016 0.50 COMPZ2 RPCOMP CIRC T Break circulation w/ 2 bpm (220 psi) 14,496.0 14,555.0 02:15 02:45 and tag top of 3 1/2" tubing stump at 14,555' MD w/ 6k Wt, 11/25/2016 11/25/2016 1.25 COMPZ2 RPCOMP MILL T Dress of tubing stump as per Baker 14,555.0 14,545.0 02:45 04:00 rep, 2 bpm, 220 psi, 50 rpm, 12k WOB. Milled out flair and tagged up on no-go @14,568' MD w/ 10k WOB and polished off. P/U above tubing stump. 11/25/2016 11/25/2016 3.00 COMPZ2 RPCOMP CIRC T Took SPR, circulated out Cl brine, and 14,545.0 14,545.0 04:00 07:00 pumped BU. Pumped an additional 1.5 BU while increasing brine lubes to 1%. 335 gpm, 2440 gpm. 11/25/2016 11/25/2016 0.50 COMPZ2 RPCOMP CRIH T Spotted 75 bbl of 10.8 ppg Cl brine 14,545.0 14,545.0 07:00 07:30 and chased w/ 120 bbl of 10.8 ppg brine. 335 gpm, 2440 psi, 470 psi on C/A. 11/25/2016 11/25/2016 0.25 COMPZ2 RPCOMP OWFF T OWFF while B/D TD and drop 2.125" 14,545.0 14,545.0 07:30 07:45 hollow drift w/ 105' tail. 11/25/2016 11/25/2016 7.75 COMPZ2 RPCOMP TRIP T POOH f/ 14,545' to 52' MD. 14,545.0 52.0 07:45 15:30 11/25/2016 11/25/2016 1.50 COMPZ2 RPCOMP BHAH T L/D Baker dressing tools. 52.0 0.0 15:30 17:00 11/25/2016 11/25/2016 2.00 COMPZ2 RPCOMP RURD T Clean and clear rig floor, P/U 0.0 0.0 17:00 19:00 Weatherford tongs, 3 1/2" elevators, and fill up hose. 11/25/2016 11/25/2016 1.25 COMPZ2 RPCOMP PUTB T M/U Barrel and overshot packer, 0.0 105.0 19:00 20:15 2.813" X nipple w/ XX lock lug, Baker Premier packer, and SBE. 11/25/2016 11/26/2016 3.75 COMPZ2 RPCOMP RCST T RIH with packer assy f/ 105'to 3,924' 105.0 3,924.0 20:15 00:00 MD, filling pipe every 5 stands with fill line. 11/26/2016 11/26/2016 9.50 COMPZ2 RPCOMP RCST T Continue RIH with packer assy f/ 3,924.0 14,549.0 00:00 09:30 3,924' to 14,549' MD, filling pipe every 5 stands with fill line. P/U= 203k, S/0= 142k 11/26/2016 11/26/2016 0.75 COMPZ2 RPCOMP PULD T P/U working single, rig up to set 14,549.0 14,549.0 09:30 10:15 packer, fill lines and pressure test to 3800 psi at surface. 11/26/2016 11/26/2016 0.25 COMPZ2 RPCOMP PACK T RIH and tagged up at 14,558' MD, 14,549.0 14,564.0 10:15 10:30 sheared swallow pins w/ 9k WOB and continued down to No -Go at 14,564' MD, inserting tubing stump in swallow packing. pressured up to 2800 psi and 140k WOB to set Packer. 11/26/2016 11/26/2016 0.50 COMPZ2 RPCOMP PRTS T Continued pressuring up to 3500 psi 14,564.0 14,564.0 10:30 11:00 and held for 30 min to test from the X nipple up to the PBR. Test held. P/U with 225k to shear out PBR while holding pressure and bleed off. 11/26/2016 11/26/2016 0.75 COMPZ2 RPCOMP OWFF T L/D working single, B/D lines, and 14,564.0 14,558.0 11:00 11:45 OWFF. Page 69/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Uepths) r<y CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/26/2016 11/26/2016 1.75 COMPZ2 RPCOMP TRIP T POOH f/ 14,558'to 11,692' MD, 14,558.0 11,692.0 11:45 13:30 racking back 32 stands of 15.7# 4" DP in derrick. 11/26/2016 11/27/2016 10.50 COMPZ2 RPCOMP PULD T Single OOH f/ 11,692' to 479' MD. 11,692.0 479.0 13:30 00:00 L/D 95 stands of 15.7# 4" DP and 22 stands of 14# 4" DP. 1 joint of 15.7# DP from Std. # 34 showed singes of washing out on the tool face and was set aside. 11/27/2016 11/27/2016 0.50 COMPZ2 RPCOMP PULD T Finish singling OOH f/ 479' to 37' MD. 479.0 37.0 00:00 00:30 11/27/2016 11/27/2016 0.50 COMPZ2 RPCOMP BHAH T L/D seal assyas per Baker. 37.0 0.0 00:30 01:00 11/27/2016 11/27/2016 0.50 COMPZ2 RPCOMP BHAH T Clean and clear rig floor. P/U BHA 0.0 0.0 01:00 01:30 components to rig floor. 11/27/2016 11/27/2016 1.00 COMPZ2 RPCOMP SVRG T Inspect derrick, service TD, 0.0 0.0 01:30 02:30 drawworks, blocks. Removed ice from derrick and oiled TD. 11/27/2016 11/27/2016 1.50 COMPZ2 RPCOMP BHAH T M/U baker clean out assy. w/ 6.81 OD 0.0 200.0 02:30 04:00 string mills. 11/27/2016 11/27/2016 2.00 COMPZ2 RPCOMP TRIP T RIH on 4" 15.7# DP f/ 200' to 2,348' 200.0 2,293.0 04:00 06:00 MD. Observed weight bobble at 2,293' MD and P/U to wash/ream out. 11/27/2016 11/27/2016 0.25 COMPZ2 RPCOMP REAM T Ream down f/ 2,293' to 2,388' MD with 2,293.0 2,483.0 06:00 06:15 300 gpm, 550 psi, 50 rpm, 1.5k TQ, Stopped pumps/ROT and RIH f/ 2,388' to 2,483' MD with no indications of obstruction. 11/27/2016 11/27/2016 0.50 COMPZ2 RPCOMP CIRC T Circulate BU at 300 gpm, 540 psi, w/ 2,483.0 2,483.0 06:15 06:45 reciprocate. B/D DP and OWFF. 11/27/2016 11/27/2016 1.00 COMPZ2 RPCOMP TRIP T POOH f/ 2,483' to 200' MD. 2,483.0 200.0 06:45 07:45 11/27/2016 11/27/2016 1.75 COMPZ2 RPCOMP BHAH T L/D Baker clean out assy. 200.0 0.0 07:45 09:30 11/27/2016 11/27/2016 0.50 COMPZ2 RPCOMP BHAH T Clean and clear rig floor. 0.0 0.0 09:30 10:00 11/27/2016 11/27/2016 1.00 COMPZ2 RPCOMP BOPE T Pull wear ring, install upper test plug 0.0 0.0 10:00 11:00 and P/U 6" test joint. Fill stack with H2O. 11/27/2016 11/27/2016 2.00 COMPZ2 RPCOMP BOPE T Tested Annular to 250/2500 psi for 5 0.0 0.0 11:00 13:00 min and held. Upper 3.5" x 6" VBRs and lower 3.5" x 6" VBRs to 250/3500 psi, Both tests held. 11/27/2016 11/27/2016 0.75 COMPZ2 RPCOMP BOPE T R/D test equipment, remove test plug, 0.0 0.0 13:00 13:45 and install wear ring. 11/27/2016 11/27/2016 1.50 COMPZ2 RPCOMP RURD T Rig up casing patch running 0.0 0.0 13:45 15:15 equipment and bring components to rig floor. 11/27/2016 11/27/2016 1.25 COMPZ2 RPCOMP BHAH T M/U 7 5/8" casing patch sections to 0.0 250.0 15:15 16:30 250' MD. 11/27/2016 11/27/2016 2.50 COMPZ2 RPCOMP BHAH T M/U inner string assy and latch in to 250.0 250.0 16:30 19:00 spear. 11/27/2016 11/27/2016 2.50 COMPZ2 RPCOMP TRIP T RIH with 7 5/8" casing patch f/ 250' to 250.0 2,458.7 19:00 21:30 2,458.72' MD. Page 70173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) r "was x CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/27/2016 11/27/2016 1.50 COMPZ2 RPCOMP OTHR T Set 7 5/8" casing patch as per WFT. 2,458.7 2,242.0 21:30 23:00 S/O to 95k and built pressure at 0.5 bpm to 1900 psi and observed expansion tool shear. continued pumping with pressure between 2200- 2900 psi, stroking piston several times to initiate expansion and finished pumping with 3400 psi. S/O 10k to confirm anchor had set, good. Proceeded to expand the rest of the liner pooling at 900 ft/hr w/ 85-210k O/P to 2,242' MD, L/D singles as they were pulled. Top of Patch at 2,271' MD Base of Patch at 2,458' MD 11/27/2016 11/28/2016 1.00 COMPZ2 RPCOMP TRIP T POOH f/ 2,271' to 627' MD 2,242.0 627.0 23:00 00:00 11/28/2016 11/28/2016 0.50 COMPZ2 RPCOMP TRIP T Continue POOH f/ 627' to 184' MD. 627.0 184.0 00:00 00:30 11/28/2016 11/28/2016 1.75 COMPZ2 RPCOMP BHAH T L/D Hydraulic jack and 3 1/2" inner 184.0 0.0 00:30 02:15 string tubing as per WFT. 11/28/2016 11/28/2016 1.25 COMPZ2 RPCOMP PRTS T Pressure tested 7 5/8" casing and 0.0 0.0 02:15 03:30 casing patch to 3500 psi for 30 min. Test held. OA started at 370 psi and build to 500 psi with 3500 psi on 7 5/8" casing. Once bleed off OA returned to 370 psi. 11/28/2016 11/28/2016 2.00 COMPZ2 RPCOMP RURD T R/D WFT running tools and casing 0.0 0.0 03:30 05:30 tongs. Clean and cleared floor. 11/28/2016 11/28/2016 3.00 COMPZ2 RPCOMP RURD T P/U and R/U 3 1/2" tubing running 0.0 0.0 05:30 08:30 equipment. L/D old I -wire spool and P/U new I -wire. P/U cannon clamps and arrange on rig floor. Bring tubing components to rig floor, hanger, XOs, and pups. 11/28/2016 11/29/2016 15.50 COMPZ2 RPCOMP PUTB T Tie in TEC line and pressure test to 0.0 9,339.0 08:30 00:00 5000 psi. Start RIH with 3 1/2" upper completion to 9,339' MD as per tally. Continued testing TEC line every 60 jts. 11/29/2016 11/29/2016 8.50 COMPZ2 RPCOMP PUTB T Continue RIH with 3 1/2" tubing f/ 0.0 14,399.0 00:00 08:30 9,339' to 14,399' MD. testing I -wire every 60 jts. 11/29/2016 11/29/2016 0.50 COMPZ2 RPCOMP PUTB T continued in on 4 jts of 3 1/2" EUE 14,399.0 14,490.0 08:30 09:00 tubing to 14,460' MD. Rigged up head pin and rolled pump at 1 bpm to observe seals entering the PBR at 14,459' MD. Cut pumps and continued in to No -Go at 14,490' MD and S/O 10k to confirm. 11/29/2016 11/29/2016 1.00 COMPZ2 RPCOMP HOSO T L/D 4 jts of 3 1/2" tubing and space 14,490.0 14,490.0 09:00 10:00 out, M/U with 10.19' pup, XO and 4 1/2" TXP jnt. 11/29/2016 11/29/2016 3.50 COMPZ2 RPCOMP THGR T M/U WR retrieval tool and retrieve 14,490.0 14,490.0 10:00 13:30 same. M/U 4 1/4" tubing hanger and landing joints. Terminate I -wire and land hanger. P/U= 135k, S/O= 105k. 11/29/2016 11/29/2016 1.00 COMPZ2 RPCOMP THGR T RILDS, R/U test equipment and test 14,490.0 14,490.0 13:30 14:30 hanger seals to 250/5000 psi for 5/10 min. Page 71/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) �aW 'x CD5-99 r' Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/29/2016 11/29/2016 2.25 COMPZ2 RPCOMP PRTS T Pressure test Tubing string to 3500 psi 14,490.0 14,490.0 14:30 16:45 for 30 min and held. Bleed off to 2000 psi and pressure tested IA to 3500 psi for 30 min. Bleed off both and pressure up IA to 1940 psi and shear SOV. 11/29/2016 11/29/2016 1.50 COMPZ2 WHDBOP MPSP P L/D landing joint and install HP-BPV 14,490.0 0.0 16:45 18:15 and test in direction of flow to 2500 psi for 15 min. 11/29/2016 11/29/2016 2.25 COMPZ2 WHDBOP WWWH P Clean drip pan, flush stack, B/D TD 0.0 0.0 18:15 20:30 and lines, remove trip nipple, and clear floor. 11/29/2016 11/29/2016 1.75 COMPZ2 WHDBOP MPDA P Rig down Flo -box, RCD clamp, hoses, 0.0 0.0 20:30 22:15 and orbit valve. Sim -Ops Bring new blind rams in to cellar. 11/29/2016 11/30/2016 2.25 COMPZ2 WHDBOP SVRG P Change out blind rams on BOP. Open 0.0 0.0 22:15 00:30 doors on upper rams for BWM. Sim - Ops, L/D trip nipple, equipment from rig floor and Remove XT -39 saver sub. 11/30/2016 11/30/2016 0.50 COMPZ2 WHDBOP NUND P L/D mouse hole and loosen choke 0.0 0.0 00:30 01:00 hoses. 11/30/2016 11/30/2016 4.50 COMPZ2 WHDBOP NUND P Disconnect choke and flare lines, N/D 0.0 0.0 00:00 04:30 BOP stack and rack back. Terminated I -line as per SLB. Sim -Ops, changed out saver sub on TD, L/D I -line spool, and mobilized Surface BHA components to rig floor. 11/30/2016 11/30/2016 2.25 COMPZ2 WHDBOP NUND P Installed smooth bore metal seal and 0.0 0.0 04:30 06:45 N/U tree as per FMC. Tested adapter flange to 5000 psi for 10 min. SLB tested TEC lines. Both tests good. 11/30/2016 11/30/2016 1.50 COMPZ2 WHDBOP PRTS P Filled tree w/ diesel and tested to 0.0 0.0 06:45 08:15 250/5000 psi for 10 min and charted. (good) 11/30/2016 11/30/2016 0.75 COMPZ2 WHDBOP MPSP P R/U Lubricator and remove test dart 0.0 0.0 08:15 09:00 and BPV as per FMC. 11/30/2016 11/30/2016 1.50 COMPZ2 WHDBOP RURD P R/U surface lines to freeze protect and 0.0 0.0 09:00 10:30 U-tube. tested lines to 2500 psi and held. 11/30/2016 11/30/2016 2.25 COMPZ2 WHDBOP FRZP P Freeze protect w/ 89.5 bbl of diesel 0.0 0.0 10:30 12:45 down the IA and taking brine returns up tubing. Sim -Ops, L/D 4" DP from derrick. 11/30/2016 11/30/2016 0.75 COMPZ2 WHDBOP FRZP P Allow diesel to U-tube for 30 min while 0.0 0.0 12:45 13:30 rigging down lines. Sim -Ops continue L/D 4" DP 11/30/2016 11/30/2016 1.00 COMPZ2 WHDBOP MPSP P R/U Lubricator and install BPV. Final 0.0 0.0 13:30 14:30 pressure on tubing, 200 psi. Pressure tested against BPV in direction of flow to 2500 psi and held for 15 min. Test good. Well secure at 14:30 hrs. 11/30/2016 11/30/2016 3.00 COMPZ2 MOVE RURD P Bleed off and R/D Lubricator. R/D test 0.0 0.0 14:30 17:30 lines, emptied cellar, cleaned pits, and continued to L/D 4" DP. Rig on Gen Power @ 15:40 hrs Page 72/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Cade Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 11/30/2016 11/30/2016 2.50 COMPZ2 MOVE MOB P Disconnect service lines to sub, freeze 0.0 0.0 17:30 20:00 protect pumps, and disconnect. Moved Ball mill to new location. Finished cleaning OBM from pipe racks and B/D steam lines. Release rig @ 20:00 hrs Page 73/73 Report Printed: 12/1/2016 NADConversion Western North Slope CD5 Alpine West Pad CD5-99A CD5-99A Definitive Survey Report 05 December, 2016 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-99 Well Position +N/ -S 0.00 usft Northing: 5,965,920.93 usft Latitude: 70° 18'50.421 N +E/ -W 0.00 usft Easting: 349,558.53 usft Longitude: 151' 13'9.507 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft Wellbore CD5-99A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) V) (nT) BG GM2016 10/1/2016 17.52 80.81 57,510 Design CD5-99A Date Audit Notes: From To Map Version: 1.0 Phase: ACTUAL Tie On Depth: 2,270.51 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction 500.00 CD5-99 Svy1 - SLB_NSG-SSHOT (CD5- (usft) (usft) (usft) (I 572.96 36.55 0.00 0.00 152.00 Survey Program Date From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 100.00 500.00 CD5-99 Svy1 - SLB_NSG-SSHOT (CD5- GYD-GC-SS Gyrodata gyro single shots 8/28/2016 11:46: 572.96 2,270.51 CD5-99 Svy2 - SLB_MWD_GMAG (CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/28/2016 11:55: 2,354.63 2,354.63 CD5-99A Svy1 - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer + known azi trend 10/1/2016 11:11: 2,400.38 15,515.86 CD5-99A Svy2 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/1/2016 11:23: 15,596.06 24,054.81 CD5-99A Svy3 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/15/2016 2:37 24,115.15 27,067.89 CD5-99A Svy4 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/25/2016 9:5E ISurvey 12/5/2016 1O35:53AM Page 2 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +EI -W Northing Easting DLS Section (usft) (I V) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.90 0.00 0.00 5,965,920.93 349,558.53 0.00 0.00 UNDEFINED 100.00 0.35 80.47 100.00 29.55 0.03 0.19 5,965,920.96 349,558.72 0.55 0.06 GYD-GC-SS(1) 200.00 0.30 136.60 200.00 129.55 -0.11 0.67 5,965,920.81 349,559.20 0.31 0.41 GYD-GC-SS(1) 300.00 0.42 180.43 300.00 229.55 -0.66 0.85 5,965,920.25 349,559.36 0.29 0.99 GYD-GC-SS (1) 400.00 1.46 178.92 399.98 329.53 -2.30 0.87 5,965,918.61 349,559.35 1.04 2.44 GYD-GC-SS(1) 500.00 2.50 174.40 499.92 429.47 -5.75 1.11 5,965,915.16 349,559.52 1.05 5.60 GYD-GC-SS(1) 572.96 2.84 173.07 572.80 502.35 -9.13 1.48 5,965,911.78 349,559.83 0.47 8.75 MWD+IFR-AK-CAZ-SC (2) 659.55 3.53 165.66 659.26 588.81 -13.84 2.40 5,965,907.05 349,560.65 0.93 13.35 MWD+IFR-AK-CAZ-SC (2) 751.03 4.95 165.13 750.48 680.03 -20.38 4.11 5,965,900.47 349,562.23 1.55 19.93 MWD+IFR-AK-CAZ-SC (2) 845.81 7.79 162.16 844.67 774.22 -30.45 7.13 5,965,890.35 349,565.04 3.02 30.23 MWD+IFR-AK-CAZ-SC (2) 12/5/2016 1O35:53AM Page 2 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (1) (1) (wsft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 940.37 11.22 158.66 937.92 867.47 -45.12 12.44 5,965,875.57 349,570.06 3.68 45.68 MWD+IFR-AK-CAZ-SC (2) 1,034.58 13.28 155.03 1,029.98 959.53 -63.47 20.34 5,965,857.07 349,577.60 2.33 65.60 MWD+IFR-AK-CAZ-SC (2) 1,129.57 14.30 153.79 1,122.23 1,051.78 -83.89 30.13 5,965,836.46 349,586.97 1.12 88.22 MWD+IFR-AK-CAZ-SC (2) 1,222.50 14.94 150.97 1,212.15 1,141.70 -104.66 41.01 5,965,815.48 349,597.43 1.03 111.66 MWD+IFR-AK-CAZ-SC (2) 1,317.05 15.53 150.01 1,303.38 1,232.93 -126.28 53.26 5,965,793.62 349,609.24 0.68 136.50 MWD+IFR-AK-CAZ-SC (2) 1,410.15 17.57 146.48 1,392.62 1,322.17 -148.79 67.25 5,965,770.83 349,622.78 2.44 162.95 MWD+IFR-AK-CAZ-SC (2) 1,506.38 21.17 141.10 1,483.40 1,412.95 -174.44 86.19 5,965,744.82 349,641.20 4.17 194.48 MWD+IFR-AK-CAZ-SC (2) 1,600.00 23.81 137.20 1,569.89 1,499.44 -201.46 109.65 5,965,717.33 349,664.11 3.24 229.36 MWD+IFR-AK-CAZ-SC (2) 1,694.62 26.66 133.78 1,655.48 1,585.03 -230.17 137.96 5,965,688.06 349,691.84 3.38 268.00 MWD+IFR-AK-CAZ-SC (2) 1,788.88 29.81 132.16 1,738.51 1,668.06 -260.54 170.60 5,965,657.05 349,723.86 3.44 310.13 MWD+IFR-AK-CAZ-SC (2) 1,882.95 32.44 130.76 1,819.04 1,748.59 -292.71 207.05 5,965,624.15 349,759.66 2.90 355.65 MWD+IFR-AK-CAZ-SC (2) 1,976.79 33.94 130.25 1,897.56 1,827.11 -326.07 246.11 5,965,590.02 349,798.04 1.63 403.45 MWD+IFR-AK-CAZ-SC (2) 2,070.83 35.82 129.12 1,974.71 1,904.26 -360.40 287.50 5,965,554.87 349,838.73 2.11 453.19 MWD+IFR-AK-CAZ-SC (2) 2,165.49 37.79 127.90 2,050.50 1,980.05 -395.70 331.88 5,965,518.69 349,882.39 2.22 505.19 MWD+IFR-AK-CAZ-SC (2) 2,259.49 40.14 127.23 2,123.58 2,053.13 -431.72 378.74 5,965,481.74 349,928.52 2.54 559.00 MWD+IFR-AK-CAZ-SC (2) 2,270.51 40.86 126.48 2,131.96 2,061.51 -436.02 384.47 5,965,477.33 349,934.15 7.89 565.48 MWD+IFR-AK-CAZ-SC (2) Tie On -10-3/4" x 13-1/2" 2,354.63 39.48 125.36 2,196.24 2,125.79 -467.85 428.40 5,965,444.62 349,977.44 1.85 614.21 INC+TREND (3) 2,400.38 38.27 124.71 2,231.85 2,161.40 -484.34 451.91 5,965,427.67 350,000.61 2.79 639.81 MWD+IFR-AK-CAZ-SC (4) 2,449.55 39.97 124.54 2,270.00 2,199.55 -501.97 477.44 5,965,409.54 350,025.78 3.46 667.35 MWD+IFR-AK-CAZ-SC (4) 2,496.41 42.85 122.76 2,305.14 2,234.69 -519.13 503.25 5,965,391.87 350,051.24 6.64 694.62 MWD+IFR-AK-CAZ-SC (4) 2,543.50 45.60 122.60 2,338.88 2,268.43 -536.86 530.89 5,965,373.59 350,078.52 5.84 723.25 MWD+IFR-AK-CAZ-SC (4) 2,590.10 47.02 122.20 2,371.07 2,300.62 -554.91 559.34 5,965,354.97 350,106.60 3.11 752.55 MWD+IFR-AK-CAZ-SC (4) 2,638.47 48.78 121.65 2,403.50 2,333.05 -573.89 589.80 5,965,335.39 350,136.67 3.74 783.61 MWD+IFR-AK-CAZ-SC (4) 2,685.65 50.29 121.67 2,434.12 2,363.67 -592.73 620.35 5,965,315.94 350,166.83 3.20 814.58 MWD+IFR-AK-CAZ-SC (4) 2,733.47 52.01 121.23 2,464.11 2,393.66 -612.15 652.12 5,965,295.88 350,198.21 3.67 846.65 MWD+IFR-AK-CAZ-SC (4) 2,781.44 53.64 120.35 2,493.10 2,422.65 -631.72 684.96 5,965,275.66 350,230.64 3.70 879.34 MWD+IFR-AK-CAZ-SC (4) 2,827.79 55.19 120.21 2,520.07 2,449.62 -650.72 717.51 5,965,256.01 350,262.80 3.35 911.40 MWD+IFR-AK-CAZ-SC (4) 2,873.78 56.60 120.81 2,545.86 2,475.41 -670.06 750.31 5,965,236.03 350,295.21 3.25 943.88 MWD+IFR-AK-CAZ-SC (4) 2,921.08 57.79 121.21 2,571.48 2,501.03 -690.54 784.39 5,965,214.87 350,328.86 2.61 977.96 MWD+IFR-AK-CAZ-SC (4) 3,016.32 59.97 123.67 2,620.71 2,550.26 -734.28 853.17 5,965,169.76 350,396.76 3.18 1,048.87 MWD+IFR-AK-CAZ-SC (4) 3,061.84 61.29 123.58 2,643.03 2,572.58 -756.25 886.21 5,965,147.13 350,429.34 2.90 1,083.78 MWD+IFR-AK-CAZ-SC (4) 3,111.30 62.67 123.84 2,666.27 2,595.82 -780.48 922.53 5,965,122.18 350,465.16 2.83 1,122.22 MWD+IFR-AK-CAZ-SC (4) 3,157.34 64.23 123.66 2,686.85 2,616.40 -803.36 956.77 5,965,098.62 350,498.94 3.41 1,158.50 MWD+IFR-AK-CAZ-SC (4) 3,203.86 65.52 123.31 2,706.60 2,636.15 -826.60 991.90 5,965,074.69 350,533.59 2.86 1,195.51 MWD+IFR-AK-CAZ-SC (4) 3,299.05 65.99 123.09 2,745.69 2,675.24 -874.12 1,064.52 5,965,025.72 350,605.24 0.54 1,271.57 MWD+IFR-AK-CAZ-SC (4) 3,392.96 66.08 122.52 2,783.83 2,713.38 -920.62 1,136.65 5,964,977.80 350,676.42 0.56 1,346.48 MWD+IFR-AK-CAZ-SC (4) 3,487.44 65.97 122.70 2,822.22 2,751.77 -967.14 1,209.37 5,964,929.83 350,748.19 0.21 1,421.70 MWD+IFR-AK-CAZ-SC (4) 3,583.78 66.02 122.64 2,861.42 2,790.97 -1,014.65 1,283.45 5,964,880.85 350,821.30 0.08 1,498.42 MWD+IFR-AK-CAZ-SC (4) 3,677.93 66.02 121.78 2,899.68 2,829.23 -1,060.50 1,356.24 5,964,833.55 350,893.15 0.83 1,573.08 MWD+IFR-AK-CAZ-SC (4) 121512016 1 0: 35 53A Page 3 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVR' TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 3,770.86 66.02 121.62 2,937.45 2,867.00 -1,105.12 1,428.48 5,964,787.50 350,964.47 0.16 1,646.39 MWD+IFR-AK-CAZ-SC (4) 3,865.49 66.11 120.21 2,975.84 2,905.39 -1,149.55 1,502.68 5,964,741.59 351,037.77 1.37 1,720.46 MWD+IFR-AK-CAZ-SC (4) 3,959.41 66.09 119.23 3,013.89 2,943.44 -1,192.12 1,577.25 5,964,697.54 351,111.46 0.95 1,793.05 MWD+IFR-AK-CAZ-SC (4) 4,054.40 66.09 119.90 3,052.39 2,981.94 -1,234.97 1,652.78 5,964,653.19 351,186.11 0.64 1,866.34 MWD+IFR-AK-CAZ-SC (4) 4,147.49 66.12 119.78 3,090.10 3,019.65 -1,277.32 1,726.61 5,964,609.37 351,259.07 0.12 1,938.40 MWD+IFR-AK-CAZ-SC (4) 4,242.73 65.49 119.45 3,129.13 3,058.68 -1,320.25 1,802.13 5,964,564.94 351,333.72 0.73 2,011.76 MWD+IFR-AK-CAZ-SC (4) 4,337.15 65.55 116.48 3,168.26 3,097.81 -1,361.86 1,877.32 5,964,521.83 351,408.04 0.94 2,083.80 MWD+IFR-AK-CAZ-SC (4) 4,430.83 65.43 119.60 3,207.12 3,136.67 -1,403.23 1,951.84 5,964,478.98 351,481.72 1.10 2,155.32 MWD+IFR-AK-CAZ-SC (4) 4,526.10 65.57 119.96 3,246.63 3,176.18 -1,446.29 2,027.08 5,964,434.42 351,556.07 0.37 2,228.66 MWD+IFR-AK-CAZ-SC (4) 4,619.67 65.37 119.87 3,285.48 3,215.03 -1,488.75 2,100.86 5,964,390.50 351,628.99 0.23 2,300.78 MWD+IFR-AK-CAZ-SC (4) 4,714.13 65.56 118.38 3,324.71 3,254.26 -1,530.57 2,175.93 5,964,347.19 351,703.19 1.45 2,372.95 MWD+IFR-AK-CAZ-SC (4) 4,809.66 65.41 118.91 3,364.34 3,293.89 -1,572.23 2,252.21 5,964,304.01 351,778.62 0.53 2,445.55 MWD+IFR-AK-CAZ-SC (4) 4,903.76 65.46 118.93 3,403.46 3,333.01 -1,613.62 2,327.12 5,964,261.13 351,852.68 0.06 2,517.26 MWD+IFR-AK-CAZ-SC (4) 4,997.13 65.61 118.54 3,442.13 3,371.68 -1,654.48 2,401.64 5,964,218.79 351,926.36 0.41 2,588.32 MWD+IFR-AK-CAZ-SC (4) 5,091.58 65.85 118.35 3,480.95 3,410.50 -1,695.49 2,477.35 5,964,176.27 352,001.22 0.31 2,660.07 MWD+IFR-AK-CAZ-SC (4) 5,186.76 65.98 118.27 3,519.80 3,449.35 -1,736.70 2,553.85 5,964,133.54 352,076.88 0.16 2,732.37 MWD+IFR-AK-CAZ-SC (4) 5,279.36 65.94 118.31 3,557.52 3,487.07 -1,776.78 2,628.31 5,964,091.98 352,150.52 0.06 2,802.72 MWD+IFR-AK-CAZ-SC (4) 5,375.09 65.80 118.22 3,596.65 3,526.20 -1,816.15 2,705.26 5,964,049.08 352,226.62 0.17 2,875.37 MWD+IFR-AK-CAZ-SC (4) 5,469.64 65.82 118.03 3,635.40 3,564.95 -1,858.81 2,781.33 5,964,006.91 352,301.85 0.18 2,946.98 MWD+IFR-AK-CAZ-SC (4) 5,562.68 65.72 118.69 3,673.58 3,603.13 -1,899.11 2,855.99 5,963,965.13 352,375.68 0.66 3,017.62 MWD+IFR-AK-CAZ-SC (4) 5,656.11 65.52 118.69 3,712.15 3,641.70 -1,939.96 2,930.64 5,963,922.79 352,449.49 0.21 3,088.73 MWD+IFR-AK-CAZ-SC (4) 5,751.20 65.37 118.51 3,751.66 3,681.21 -1,981.36 3,006.57 5,963,879.88 352,524.58 0.23 3,160.94 MWD+IFR-AK-CAZ-SC (4) 5,845.38 65.39 117.03 3,790.90 3,720.45 -2,021.25 3,082.33 5,963,838.48 352,599.51 1.43 3,231.73 MWD+IFR-AK-CAZ-SC (4) 5,939.38 65.59 116.84 3,829.90 3,759.45 -2,060.00 3,156.58 5,963,798.22 352,674.97 0.28 3,301.73 MWD+IFR-AK-CAZ-SC (4) 6,033.53 65.51 117.08 3,868.87 3,798.42 -2,098.85 3,234.97 5,963,757.84 352,750.56 0.25 3,371.90 MWD+IFR-AK-CAZ-SC (4) 6,127.05 65.97 117.21 3,907.29 3,836.84 -2,137.75 3,310.84 5,963,717.43 352,825.63 0.51 3,441.87 MWD+IFR-AK-CAZ-SC (4) 6,220.59 66.04 117.69 3,945.33 3,874.88 -2,177.15 3,366.68 5,963,676.53 352,900.65 0.47 3,512.25 MWD+IFR-AK-CAZ-SC (4) 6,315.27 65.97 118.38 3,983.83 3,913.38 -2,217.80 3,463.02 5,963,634.36 352,976.17 0.67 3,583.99 MWD+IFR-AK-CAZ-SC (4) 6,409.67 66.13 118.52 4,022.15 3,951.70 -2,258.90 3,538.88 5,963,591.75 353,051.18 0.22 3,655.89 MWD+IFR-AK-CAZ-SC (4) 6,503.79 66.01 118.96 4,060.33 3,989.88 -2,300.27 3,614.31 5,963,548.88 353,125.76 0.45 3,727.83 MWD+IFR-AK-CAZ-SC (4) 6,597.09 65.42 119.01 4,098.70 4,028.25 -2,341.48 3,688.70 5,963,506.20 353,199.30 0.63 3,799.14 MWD+IFR-AK-CAZ-SC (4) 6,691.36 65.60 118.33 4,137.78 4,067.33 -2,382.63 3,763.97 5,963,463.54 353,273.73 0.68 3,870.82 MWD+IFR-AK-CAZ-SC (4) 6,785.93 65.05 117.50 4,177.26 4,106.81 -2,422.87 3,839.91 5,963,421.80 353,348.84 0.99 3,941.99 MWD+IFR-AK-CAZ-SC (4) 6,880.32 64.95 118.47 4,217.15 4,146.70 -2,463.01 3,915.45 5,963,380.16 353,423.55 0.94 4,012.90 MWD+IFR-AK-CAZ-SC (4) 6,974.06 65.54 119.25 4,256.42 4,185.97 -2,504.10 3,990.02 5,963,337.58 353,497.28 0.98 4,084.19 MWD+IFR-AK-CAZ-SC (4) 7,068.23 65.52 119.63 4,295.41 4,224.96 -2,546.22 4,064.64 5,963,293.97 353,571.04 0.37 4,156.42 MWD+IFR-AK-CAZ-SC (4) 7,163.21 65.53 120.14 4,334.76 4,264.31 -2,589.30 4,139.59 5,963,249.41 353,645.11 0.49 4,229.63 MWD+IFR-AK-CAZ-SC (4) 7,254.95 65.55 119.82 4,372.75 4,302.30 -2,631.02 4,211.93 5,963,206.25 353,716.58 0.32 4,300.44 MWD+IFR-AK-CAZ-SC (4) 7,349.11 65.49 120.15 4,411.77 4,341.32 -2,673.85 4,286.15 5,963,161.94 353,789.93 0.33 4,373.10 MWD+IFR-AK-CAZ-SC (4) 7,443.24 65.53 120.53 4,450.79 4,380.34 -2,717.12 4,360.08 5,963,117.20 353,862.97 0.37 4,446.01 MWD+IFR-AK-CAZ-SC (4) 12/52016 10.35:53AM Page 4 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°► (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,537.81 65.62 121.26 4,489.89 4,419.44 -2,761.33 4,433.97 5,963,071.52 353,935.95 0.71 4,519.74 MWD+IFR-AK-CAZ-SC (4) 7,631.19 65.55 121.92 4,528.49 4,458.04 -2,805.88 4,506.40 5,963,025.54 354,007.47 0.65 4,593.07 MWD+IFR-AK-CAZ-SC (4) 7,723.34 65.59 121.62 4,566.60 4,496.15 -2,850.05 4,577.73 5,962,979.95 354,077.90 0.30 4,665.56 MWD+IFR-AK-CAZ-SC (4) 7,818.15 65.53 121.19 4,605.83 4,535.38 -2,895.03 4,651.40 5,962,933.51 354,150.64 0.42 4,739.85 MWD+IFR-AK-CAZ-SC (4) 7,913.03 65.50 120.34 4,645.15 4,574.70 -2,939.19 4,725.59 5,962,887.87 354,223.93 0.82 4,813.69 MWD+IFR-AK-CAZ-SC (4) 8,006.35 65.49 119.93 4,683.86 4,613.41 -2,981.82 4,799.03 5,962,843.78 354,296.50 0.40 4,885.80 MWD+IFR-AK-CAZ-SC (4) 8,101.59 65.59 118.86 4,723.30 4,652.85 -3,024.37 4,874.56 5,962,799.73 354,371.15 1.03 4,958.83 MWD+IFR-AK-CAZ-SC (4) 8,194.58 65.58 119.13 4,761.73 4,691.28 -3,065.42 4,948.62 5,962,757.21 354,444.37 0.26 5,029.84 MWD+IFR-AK-CAZ-SC (4) 8,290.23 65.53 119.28 4,801.31 4,730.86 -3,107.91 5,024.63 5,962,713.21 354,519.51 0.15 5,103.04 MWD+IFR-AK-CAZ-SC (4) 8,384.19 65.40 119.02 4,840.33 4,769.88 -3,149.54 5,099.28 5,962,670.09 354,593.30 0.29 5,174.85 MWD+IFR-AK-CAZ-SC (4) 8,477.96 65.40 118.57 4,879.37 4,808.92 -3,190.61 5,173.99 5,962,627.54 354,667.17 0.44 5,246.18 MWD+IFR-AK-CAZ-SC (4) 8,571.84 65.43 117.50 4,918.43 4,847.98 -3,230.73 5,249.34 5,962,585.92 354,741.70 1.04 5,316.98 MWD+IFR-AK-CAZ-SC (4) 8,665.25 65.65 116.91 4,957.10 4,886.65 -3,269.60 5,324.96 5,962,545.54 354,816.52 0.62 5,386.81 MWD+IFR-AK-CAZ-SC (4) 8,760.88 65.94 116.99 4,996.31 4,925.86 -3,309.13 5,402.71 5,962,504.46 354,893.46 0.31 5,458.21 MWD+IFR-AK-CAZ-SC (4) 8,855.16 66.00 117.54 5,034.70 4,964.25 -3,348.58 5,479.26 5,962,463.49 354,969.19 0.54 5,528.98 MWD+IFR-AK-CAZ-SC (4) 8,947.50 66.06 118.23 5,072.22 5,001.77 -3,388.04 5,553.83 5,962,422.55 355,042.96 0.69 5,598.83 MWD+IFR-AK-CAZ-SC (4) 9,041.26 66.16 118.79 5,110.19 5,039.74 -3,428.96 5,629.17 5,962,380.13 355,117.45 0.56 5,670.33 MWD+IFR-AK-CAZ-SC (4) 9,135.01 66.13 119.41 5,148.10 5,077.65 -3,470.66 5,704.08 5,962,336.94 355,191.51 0.61 5,742.32 MWD+IFR-AK-CAZ-SC (4) 9,230.32 66.03 119.16 5,186.75 5,116.30 -3,513.28 5,780.07 5,962,292.82 355,266.62 0.26 5,815.62 MWD+IFR-AK-CAZ-SC (4) 9,324.30 66.13 119.24 5,224.85 5,154.40 -3,555.19 5,855.06 5;962,249.41 355,340.75 0.13 5,887.83 MWD+IFR-AK-CAZ-SC (4) 9,417.28 66.00 118.27 5,262.58 5,192.13 -3,596.07 5,929.57 5,962,207.05 355,414.42 0.96 5,958.91 MWD+IFR-AK-CAZ-SC (4) 9,512.16 65.56 116.68 5,301.50 5,231.05 -3,635.99 6,006.33 5,962,165.60 355,490.36 1.60 6,030.19 MWD+IFR-AK-CAZ-SC (4) 9,604.38 65.43 116.53 5,339.75 5,269.30 -3,673.57 6,081.36 5,962,126.53 355,564.62 0.20 6,098.60 MWD+IFR-AK-CAZ-SC (4) 9,700.78 65.87 116.73 5,379.50 5,309.05 -3,712.94 6,159.87 5,962,085.60 355,642.31 0.49 6,170.21 MWD+IFR-AK-CAZ-SC (4) 9,793.87 65.46 118.06 5,417.86 5,347.41 -3,751.96 6,235.17 5,962,045.08 355,716.82 1.37 6,240.02 MWD+IFR-AK-CAZ-SC (4) 9,888.80 65.62 119.96 5,457.17 5,386.72 -3,793.87 6,310.74 5,962,001.67 355,791.52 1.83 6,312.50 MWD+IFR-AK-CAZ-SC (4) 9,982.62 66.04 120.86 5,495.58 5,425.13 -3,837.19 6,384.55 5,961,956.88 355,864.45 0.98 6,385.41 MWD+IFR-AK-CAZ-SC (4) 10,076.49 66.01 121.88 5,533.73 5,463.28 -3,881.84 6,457.79 5,961,910.78 355,936.77 0.99 6,459.21 MWD+IFR-AK-CAZ-SC (4) 10,169.41 66.16 122.87 5,571.40 5,500.95 -3,927.32 6,529.52 5,961,863.87 356,007.57 0.99 6,533.05 MWD+IFR-AK-CAZ-SC (4) 10,264.29 66.04 123.77 5,609.84 5,539.39 -3,974.97 6,602.01 5,961,814.78 356,079.08 0.88 6,609.15 MWD+IFR-AK-CAZ-SC (4) 10,358.35 66.03 124.16 5,648.04 5,577.59 A,022.99 6,673.29 5,961,765.34 356,149.39 0.38 6,685.01 MWD+IFR-AK-CAZ-SC (4) 10,451.09 65.99 122.80 5,685.75 5,615.30 A,069.73 6,743.96 5,961,717.20 356,219.10 1.34 6,759.46 MWD+IFR-AK-CAZ-SC (4) 10,544.91 65.53 122.64 5,724.27 5,653.82 -4,115.97 6,815.94 5,961,669.53 356,290.13 0.51 6,834.08 MWD+IFR-AK-CAZ-SC (4) 10,639.55 65.46 121.68 5,763.52 5,693.07 A, 161.81 6,888.84 5,961,622.25 356,362.09 0.93 6,908.77 MWD+IFR-AK-CAZ-SC (4) 10,734.25 65.31 120.97 5,802.97 5,732.52 -4,206.57 6,962.38 5,961,576.03 356,434.72 0.70 6,982.82 MWD+IFR-AK-CAZ-SC (4) 10,828.68 65.51 121.04 5,842.26 5,771.81 -4,250.80 7,035.98 5,961,530.33 356,507.41 0.22 7,056.43 MWD+IFR-AK-CAZ-SC (4) 10,923.35 65.44 120.29 5,881.56 5,811.11 -4,294.73 7,110.06 5,961,484.93 356,580.59 0.72 7,129.99 MWD+IFR-AK-CAZ-SC (4) 11,018.15 65.38 119.51 5,921.01 5,850.56 -4,337.70 7,184.79 5,961,440.48 356,654.44 0.75 7,203.02 MWD+IFR-AK-CAZ-SC (4) 11,111.02 65.37 119.39 5,959.71 5,889.26 -4,379.21 7,258.31 5,961,397.51 356,727.10 0.12 7,274.18 MWD+IFR-AK-CAZ-SC (4) 11,204.74 65.57 118.45 5,998.62 5,928.17 -4,420.44 7,332.93 5,961,354.79 356,800.88 0.94 7,345.62 MWD+IFR-AK-CAZ-SC (4) 12/&2016 10:35:53AM Page 5 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope ND Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section Waft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 11,298.23 65.56 117.64 6,037.29 5,966.84 -4,460.46 7,408.05 5,961,313.28 356,875.18 0.79 7,416.22 MWD+IFR-AK-CAZ-SC (4) 11,392.12 65.57 117.93 6,076.13 6,005.68 -4,500.30 7,483.68 5,961,271.93 356,949.99 0.28 7,486.91 MWD+IFR-AK-CAZ-SC (4) 11,484.54 65.30 118.06 6,114.55 6,044.10 -4,539.76 7,557.90 5,961,231.00 357,023.39 0.32 7,556.59 MWD+IFR-AK-CAZ-SC (4) 11,577.92 65.64 117.98 6,153.32 6,082.87 -4,579.67 7,632.89 5,961,189.60 357,097.57 0.37 7,627.03 MWD+IFR-AK-CAZ-SC (4) 11,673.36 65.52 117.73 6,192.78 6,122.33 -4,620.27 7,709.73 5,961,147.47 357,173.57 0.27 7,698.95 MWD+IFR-AK-CAZ-SC (4) 11,765.10 65.57 118.48 6,230.75 6,160.30 -4,659.61 7,783.39 5,961,106.66 357,246.42 0.75 7,768.27 MWD+IFR-AK-CAZ-SC (4) 11,860.16 65.60 119.08 6,270.05 6,199.60 -4,701.28 7,859.25 5,961,063.48 357,321.43 0.58 7,840.68 MWD+IFR-AK-CAZ-SC (4) 11,952.38 65.50 118.87 6,308.22 6,237.77 -4,741.95 7,932.70 5,961,021.35 357,394.04 0.23 7,911.07 MWD+IFR-AK-CAZ-SC (4) 12,046.87 65.51 118.68 6,347.39 6,276.94 -4,783.34 8,008.06 5,960,978.46 357,468.55 0.18 7,983.00 MWD+IFR-AK-CAZ-SC (4) 12,139.12 65.56 118.79 6,385.60 6,315.15 -4,823.71 8,081.69 5,960,936.63 357,541.35 0.12 8,053.21 MWD+IFR-AK-CAZ-SC (4) 12,233.31 66.14 118.41 6,424.13 6,353.68 -4,864.85 8,157.15 5,960,893.99 357,615.97 0.72 8,124.96 MWD+IFR-AK-CAZ-SC (4) 12,326.43 66.07 118.07 6,461.85 6,391.40 -4,905.14 8,232.15 5,960,852.21 357,690.14 0.34 8,195.74 MWD+IFR-AK-CAZ-SC (4) 12,422.58 66.04 117.55 6,500.88 6,430.43 -4,946.13 8,309.88 5,960,809.67 357,767.03 0.50 8,268.43 MWD+IFR-AK-CAZ-SC (4) 12,516.13 66.01 117.75 6,538.89 6,468.44 -4,985.80 8,385.60 5,960,768.50 357,841.93 0.20 8,339.00 MWD+IFR-AK-CAZ-SC (4) 12,610.15 65.95 117.93 6,577.16 6,506.71 -5,025.91 8,461.53 5,960,726.88 357,917.04 0.19 8,410.06 MWD+IFR-AK-CAZ-SC (4) 12,704.01 65.91 118.06 6,615.44 6,544.99 -5,066.13 8,537.21 5,960,685.15 357,991.89 0.13 6,481.10 MWD+IFR-AK-CAZ-SC (4) 12,797.27 65.94 117.44 6,653.49 6,583.04 -5,105.78 8,612.56 5,960,644.00 358,066.42 0.61 8,551.49 MWD+IFR-AK-CAZ-SC (4) 12,889.72 66.07 117.82 6,691.08 6,620.63 -5,144.95 8,687.39 5,960,603.35 358,140.45 0.40 8,621.20 MWD+IFR-AK-CAZ-SC (4) 12,984.74 66.11 117.20 6,729.59 6,659.14 -5,185.07 8,764.43 5,960,561.69 358,216.67 0.60 8,692.80 MWD+IFR-AK-CAZ-SC (4) 13,078.29 65.60 117.77 6,767.86 6,697.41 -5,224.47 8,840.16 5,960,520.79 358,291.59 0.78 8,763.14 MWD+IFR-AK-CAZ-SC (4) 13,171.16 65.52 118.60 6,806.28 6,735.83 -5,264.40 8,914.68 5,960,479.37 358,365.29 0.82 8,833.38 MWD+IFR-AK-CAZ-SC (4) 13,266.22 65.86 119.22 6,845.42 6,774.97 -5,306.28 8,990.52 5,960,435.98 358,440.26 0.69 8,905.96 MWD+IFR-AK-CAZ-SC (4) 13,359.66 65.96 118.69 6,883.56 6,813.11 -5,347.58 9,065.16 5,960,393.20 358,514.05 0.53 8,977.46 MWD+IFR-AK-CAZ-SC (4) 13,453.44 65.63 117.83 6,922.01 6,851.56 -5,388.08 9,140.50 5,960,351.21 358,588.56 0.91 9,048.59 MWD+IFR-AK-CAZ-SC (4) 13,547.24 65.50 119.12 6,960.81 6,890.36 -5,428.79 9,215.56 5,960,309.00 358,662.79 1.26 9,119.78 MWD+IFR-AK-CAZ-SC (4) 13,641.15 65.47 119.07 6,999.78 6,929.33 -5,470.34 9,290.22 5,960,265.97 358,736.60 0.06 9,191.52 MWD+IFR-AK-CAZ-SC (4) 13,734.37 65.54 118.83 7,038.43 6,967.98 -5,511.40 9,364.45 5,960,223.43 358,809.99 0.25 9,262.62 MWD+IFR-AK-CAZ-SC (4) 13,827.74 65.28 117.91 7,077.28 7,006.83 -5,551.74 9,439.16 5,960,181.60 358,883.86 0.94 9,333.31 MWD+IFR-AK-CAZ-SC (4) 13,921.59 65.19 118.28 7,116.60 7,046.15 -5,591.88 9,514.33 5,960,139.97 358,958.21 0.37 9,404.04 MWD+IFR-AK-CAZ-SC (4) 14,014.98 65.22 117.72 7,155.76 7,085.31 -5,631.68 9,589.19 5,960,098.68 359,032.25 0.55 9,474.33 MWD+IFR-AK-CAZ-SC (4) 14,109.07 65.26 118.12 7,195.17 7,124.72 -5,671.68 9,664.69 5,960,057.18 359,106.92 0.39 9,545.09 MWD+IFR-AK-CAZ-SC (4) 14,202.98 65.22 117.93 7,234.50 7,164.05 -5,711.75 9,739.96 5,960,015.61 359,181.38 0.19 9,615.81 MWD+IFR-AK-CAZ-SC (4) 14,296.25 65.75 118.61 7,273.20 7,202.75 -5,751.94 9,814.70 5,959,973.93 359,255.29 0.87 9,686.39 MWD+IFR-AK-CAZ-SC (4) 14,389.83 66.77 119.72 7,310.87 7,240.42 -5,793.69 9,889.50 5,959,930.70 359,329.23 1.54 9,758.36 MWD+IFR-AK-CAZ-SC (4) 14,483.30 68.61 119.67 7,346.36 7,275.91 -5,836.53 9,964.61 5,959,886.37 359,403.47 1.97 9,831.45 MWD+IFR-AK-CAZ-SC (4) 14,577.19 70.60 119.61 7,379.07 7,308.62 -5,880.05 10,041.10 5,959,841.33 359,479.06 2.12 9,905.78 MWD+IFR-AK-CAZ-SC (4) 14,671.64 74.36 118.47 7,407.50 7,337.05 -5,923.75 10,119.83 5,959,796.06 359,556.90 4.14 9,981.34 MWD+IFR-AK-CAZ-SC (4) 14,766.17 76.79 117.86 7,431.05 7,360.60 -5,966.96 10,200.54 5,959,751.25 359,636.71 2.65 10,057.37 MWD+IFR-AK-CAZ-SC (4) 14,858.93 79.19 118.06 7,450.35 7,379.90 -6,009.49 10,280.67 5,959,707.12 359,715.97 2.60 10,132.55 MWD+IFR-AK-CAZ-SC (4) 14,953.15 79.58 118.16 7,467.71 7,397.26 -6,053.13 10,362.35 5,959,661.86 359,796.76 0.43 10,209.43 MWD+IFR-AK-CAZ-SC (4) 12152016 10:35.53AM Page 6 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +Nl-S +E1 -W Northing Easting US Section (usft) (°) 0 (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 15,046.95 79.69 119.36 7,484.58 7,414.13 -6,097.52 10,443.24 5,959,615.86 359,876.73 1.26 10,286.60 MWD+IFR-AK-CAZ-SC (4) 15,141.26 79.67 119.78 7,501.48 7,431.03 -6,143.31 10,523.94 5,959,568.46 359,956.49 0.44 10,364.91 MWD+IFR-AK-CAZ-SC (4) 15,233.58 80.53 120.85 7,517.35 7,446.90 -6,189.21 10,602.45 5,959,521.00 360,034.06 1.47 10,442.30 MWD+IFR-AK-CAZ-SC (4) 15,327.33 81.34 123.18 7,532.12 7,461.67 -6,238.29 10,680.94 5,959,470.36 360,111.54 2.60 10,522.48 MWD+IFR-AK-CAZ-SC(4) 15,420.95 81.98 126.10 7,545.71 7,475.26 -6,290.94 10,757.14 5,959,416.20 360,186.67 3.16 10,604.74 MWD+IFR-AK-CAZ-SC (4) 15,515.86 82.57 128.99 7,558.47 7,488.02 -6,348.25 10,831.70 5,959,357.42 360,260.06 3.08 10,690.34 MWD+IFR-AK-CAZ-SC (4) 15,570.58 85.13 131.47 7,564.33 7,493.88 -6,383.38 10,873.22 5,959,321.46 360,300.87 6.49 10,740.86 MWD+IFR-AK-CAZ-SC (5) 7-18" x 9-718" by 11" 15,596.06 86.32 132.62 7,566.23 7,495.78 -6,400.40 10,892.09 5,959,304.07 360,319.39 6.49 10,764.74 MWD+IFR-AK-CAZ-SC (5) 15,624.47 67.57 132.14 7,567.75 7,497.30 -6,419.52 10,913.05 5,959,284.53 360,339.96 4.71 10,791.47 MWD+IFR-AK-CAZ-SC (5) 15,719.67 87.06 132.15 7,572.21 7,501.76 -6,483.33 10,983.56 5,959,219.33 360,409.17 0.54 10,880.91 MWD+IFR-AK-CAZ-SC (5) 15,816.56 87.18 132.78 7,577.07 7,506.62 -6,548.66 11,054.94 5,959,152.59 360,479.23 0.66 10,972.10 MWD+IFR-AK-CAZ-SC (5) 15,910.31 87.07 132.33 7,581.78 7,511.33 -6,611.98 11,123.91 5,959,087.90 360,546.91 0.49 11,060.40 MWD+IFR-AK-CAZ-SC (5) 16,005.46 87.20 133.48 7,586.53 7,516.08 -6,676.68 11,193.52 5,959,021.83 360,615.20 1.21 11,150.20 MWD+IFR-AK-CAZ-SC (5) 16,101.56 87.85 132.62 7,590.68 7,520.23 -6,742.22 11,263.68 5,958,954.90 360,684.03 1.12 11,241.00 MWD+IFR-AK-CAZ-SC (5) 16,195.64 89.19 133.54 7,593.11 7,522.66 -6,806.45 11,332.37 5,958,889.31 360,751.41 1.73 11,329.97 MWD+IFR-AK-CAZ-SC (5) 16,291.29 88.98 132.21 7,594.64 7,524.19 -6,871.52 11,402.45 5,958,822.85 360,820.18 1.41 11,420.32 MWD+IFR-AK-CAZ-SC (5) 16,385.89 89.93 133.55 7,595.54 7,525.09 -6,935.89 11,471.77 5,958,757.11 360,888.18 1.74 11,509.70 MWD+IFR-AK-CAZ-SC (5) 16,480.41 89.99 135.19 7,595.60 7,525.15 -7,001.98 11,539.33 5,958,689.68 360,954.40 1.74 11,599.77 MWD+IFR-AK-CAZ-SC (5) 16,575.56 89.86 136.48 7,595.73 7,525.28 -7,070.24 11,605.63 5,958,620.12 361,019.31 1.36 11,691.16 MWD+IFR-AK-CAZ-SC (5) 16,670.89 88.90 141.38 7,596.76 7,526.31 -7,142.08 11,668.23 5,958,547.04 361,080.46 5.24 11,783.99 MWD+IFR-AK-CAZ-SC (5) 16,766.40 89.44 146.55 7,598.15 7,527.70 -7,219.28 11,724.39 5,958,468.74 361,135.06 5.44 11,878.52 MWD+IFR-AK-CAZ-SC (5) 16,860.74 90.31 147.35 7,598.35 7,527.90 -7,298.35 11,775.84 5,958,388.65 361,184.91 1.25 11,972.49 MWD+IFR-AK-CAZ-SC (5) 16,956.67 90.23 146.42 7,597.90 7,527.45 -7,378.70 11,828.25 5,958,307.28 361,235.69 0.97 12,068.03 MWD+IFR-AK-CAZ-SC (5) 17,051.13 90.31 147.11 7,597.45 7,527.00 -7,457.71 11,880.02 5,958,227.26 361,285.87 0.74 12,162.10 MWD+IFR-AK-CAZ-SC (5) 17,148.13 89.56 149.30 7,597.56 7,527.11 -7,540.15 11,931.13 5,958,143.82 361,335.31 2.39 12,258.88 MWD+IFR-AK-CAZ-SC (5) 17,240.81 87.84 150.53 7,599.67 7,529.22 -7,620.32 11,977.57 5,958,062.74 361,380.13 2.28 12,351.47 MWD+IFR-AK-CAZ-SC (5) 17,336.50 87.75 150.23 7,603.35 7,532.90 -7,703.44 12,024.83 5,957,978.69 361,425.71 0.33 12,447.05 MWD+IFR-AK-CAZ-SC (5) 17,431.46 90.30 151.02 7,604.96 7,534.51 -7,786.17 12,071.40 5,957,895.05 361,470.61 2.81 12,541.96 MWD+IFR-AK-CAZ-SC (5) 17,527.24 90.95 152.13 7,603.92 7,533.47 -7,870.40 12,116.99 5,957,809.93 361,514.50 1.34 12,637.73 MWD+IFR-AK-CAZ-SC (5) 17,622.07 89.62 153.34 7,603.45 7,533.00 -7,954.69 12,160.43 5,957,724.80 361,556.24 1.90 12,732.55 MWD+IFR-AK-CAZ-SC (5) 17,716.24 89.93 151.78 7,603.82 7,533.37 -8,038.26 12,203.82 5,957,640.38 361,597.95 1.69 12,826.71 MWD+IFR-AK-CAZ-SC (5) 17,812.74 89.72 151.73 7,604.11 7,533.66 -8,123.27 12,249.49 5,957,554.48 361,641.90 0.22 12,923.21 MWD+IFR-AK-CAZ-SC (5) 17,907.72 88.74 151.93 7,605.39 7,534.94 -8,206.99 12,294.32 5,957,469.88 361,685.04 1.05 13,018.18 MWD+IFR-AK-CAZ-SC (5) 18,003.03 88.54 151.00 7,607.65 7,537.20 -8,290.70 12,339.84 5,957,385.28 361,728.87 1.00 13,113.45 MWD+IFR-AK-CAZ-SC (5) 18,098.68 88.68 151.04 7,609.97 7,539.52 -8,374.35 12,386.17 5,957,300.73 361,773.51 0.15 13,209.06 MWD+IFR-AK-CAZ-SC (5) 18,193.93 88.78 151.63 7,612.08 7,541.63 -8,457.90 12,431.85 5,957,216.28 361,817.50 0.63 13,304.28 MWD+IFR-AK-CAZ-SC (5) 18,288.94 89.27 152.24 7,613.70 7,543.25 -8,541.73 12,476.54 5,957,131.59 361,860.50 0.82 13,399.28 MWD+IFR-AK-CAZ-SC (5) 18,384.43 89.47 153.14 7,614.75 7,544.30 -8,626.57 12,520.35 5,957,045.89 361,902.60 0.97 13,494.75 MWD+IFR-AK-CAZ-SC (5) 18,480.69 90.03 152.57 7,615.17 7,544.72 -8,712.22 12,564.26 5,956,959.38 361,944.79 0.83 13,591.00 MWD+IFR-AK-CAZ-SC (5) 12/5/2016 10:35:53AM Page 7 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°J (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 18,576.20 89.71 153.04 7,615.39 7,544.94 -8,797.18 12,607.91 5,956,873.58 361,986.72 0.60 13,686.50 MWD+IFR-AK-CAZ-SC (5) 18,671.80 89.75 151.63 7,615.84 7,545.39 -8,881.84 12,652.30 5,956,788,04 362,029.40 1.48 13,782.10 MWD+IFR-AK-CAZ-SC (5) 18,767.80 89.82 152.07 7,616.20 7,545.75 -8,966.49 12,697.59 5,956,702.51 362,072.98 0.46 13,878.10 MWD+IFR-AK-CAZ-SC (5) 18,861.96 89.75 153.35 7,616.55 7,546.10 -9,050.16 12,740.76 5,956,617.99 362,114.47 1.36 13,972.25 MWD+IFR-AK-CAZ-SC (5) 18,957.52 89.22 152.95 7,617.41 7,546.96 -9,135.42 12,783.92 5,956,531.90 362,155.90 0.69 14,067.78 MWD+IFR-AK-CAZ-SC (5) 19,052.27 89.79 152.30 7,618.23 7,547.78 -9,219.55 12,827.48 5,956,446.91 362,197.77 0.91 14,162.52 MWD+IFR-AK-CAZ-SC (5) 19,148.41 89.43 152.40 7,618.88 7,548.43 -9,304.71 12,872.10 5,956,360.89 362,240.67 0.39 14,258.66 MWD+IFR-AK-CAZ-SC (5) 19,244.33 89.34 152.27 7,619.91 7,549.46 -9,389.66 12,916.63 5,956,275.07 362,283.49 0.16 14,354.57 MWD+IFR-AK-CAZ-SC (5) 19,339.86 89.16 151.97 7,621.16 7,550.71 -9,474.10 12,961.30 5,956,189.76 362,326.45 0.37 14,450.09 MWD+IFR-AK-CAZ-SC (5) 19,436.17 88.91 151.14 7,622.78 7,552.33 -9,558.77 13,007.17 5,956,104.20 362,370.61 0.90 14,546.38 MWD+IFR-AK-CAZ-SC (5) 19,531.99 89.49 150.20 7,624.12 7,553.67 -9,642.29 13,054.10 5,956,019.75 362,415.85 1.15 14,642.17 MWD+IFR-AK-CAZ-SC (5) 19,624.64 89.06 150.51 7,625.29 7,554.84 -9,722.81 13,099.92 5,955,938.34 362,460.05 0.57 14,734.77 MWD+IFR-AK-CAZ-SC (5) 19,722.54 88.74 151.43 7,627.17 7,556.72 -9,808.39 13,147.42 5,955,851.83 362,505.82 0.99 14,832.64 MWD+IFR-AK-CAZ-SC (5) 19,814.91 89.09 151.61 7,628.92 7,558.47 -9,889.57 13,191.46 5,955,769.79 362,548.22 0.43 14,924.99 MWD+IFR-AK-CAZ-SC (5) 19,909.92 89.76 151.88 7,629.88 7,559.43 -9,973.25 13,236.43 5,955,685.23 362,591.51 0.76 15,019.99 MWD+IFR-AKCAZ-SC (5) 20,006.12 89.71 151.08 7,630.32 7,559.87 -10,057.78 13,282.36 5,955,599.81 362,635.73 0.83 15,116.18 MWD+IFR-AK-CAZ-SC (5) 20,101.20 90.02 150.62 7,630.55 7,560.10 -10,140.82 13,328.68 5,955,515.86 362,680.37 0.58 15,211.24 MWD+IFR-AK-CAZ-SC (5) 20,196.48 90.10 151.23 7,630.45 7,560.00 -10,224.09 13,374.98 5,955,431.69 362,724.99 0.65 15,306.51 MWD+IFR-AK-CAZ-SC (5) 20,292.68 89.47 151.56 7,630.81 7,560.36 -10,308.55 13,421.04 5,955,346.33 362,769.34 0.74 15,402.70 MWD+IFR-AK-CAZ-SC (5) 20,387.59 89.17 151.84 7,631.93 7,561.48 -10,392.11 13,466.03 5,955,261.89 362,812.65 0.43 15,497.60 MWD+IFR-AK-CAZ-SC (5) 20,482.78 88.57 151.47 7,633.81 7,563.36 -10,475.87 13,511.21 5,955,177.25 362,856.14 0.74 15,592.77 MWD+IFR-AK-CAZ-SC (5) 20,578.73 88.95 151.66 7,635.89 7,565.44 -10,560.22 13,556.89 5,955,092.00 362,900.12 0.44 15,688.70 MWD+IFR-AK-CAZ-SC (5) 20,674.03 89.61 150.34 7,637.08 7,566.63 -10,643.56 13,603.09 5,955,007.76 362,944.63 1.55 15,783.97 MWD+IFR-AK-CAZ-SC (5) 20,768.65 89.95 150.36 7,637.45 7,567.00 -10,725.79 13,649.90 5,954,924.61 362,989.78 0.36 15,878.55 MWD+IFR-AK-CAZ-SC (5) 20,864.50 90.17 150.51 7,637.35 7,566.90 -10,809.16 13,697.19 5,954,840.32 363,035.39 0.28 15,974.37 MWD+IFR-AK-CAZ-SC (5) 20,958.88 89.71 150.31 7,637.45 7,567.00 -10,891.23 13,743.79 5,954,757.34 363,080.34 0.53 16,068.71 MWD+IFR-AK-CAZ-SC (5) 21,057.19 89.19 150.71 7,638.39 7,567.94 -10,976.80 13,792.19 5,954,670.82 363,127.00 0.67 16,166.98 MWD+IFR-AK-CAZ-SC (5) 21,152.71 89.03 152.00 7,639.87 7,569.42 -11,060.62 13,837.97 5,954,586.11 363,171.09 1.36 16,262.48 MWD+IFR-AK-CAZ-SC (5) 21,245.12 89.02 151.58 7,641.45 7,571.00 -11,142.04 13,881.65 5,954,503.83 363,213.13 0.45 16,354.88 MWD+IFR-AK-CAZ-SC (5) 21,341.83 89.20 151.35 7,642.95 7,572.50 -11,226.99 13,927.84 5,954,417.98 363,257.60 0.30 16,451.57 MWD+IFR-AK-CAZ-SC (5) 21,434.86 89.09 152.02 7,644.34 7,573.89 -11,308.88 13,971.96 5,954,335.23 363,300.07 0.73 16,544.59 MWD+IFR-AK-CAZ-SC (5) 21,530.74 89.40 152.79 7,645.60 7,575.15 -11,393.85 14,016.37 5,954,249.40 363,342.77 0.87 16,640.46 MWD+IFR-AK-CAZ-SC (5) 21,626.52 89.89 152.33 7,646.19 7,575.74 -11,478.85 14,060.50 5,954,163.54 363,385.19 0.70 16,736.23 MWD+IFR-AK-CAZ-SC (5) 21,720.74 89.95 152.90 7,646.32 7,575.87 -11,562.51 14,103.84 5,954,079.03 363,426.84 0.61 16,830.44 MWD+IFR-AK-CAZ-SC (5) 21,816.41 89.89 153.44 7,646.46 7,576.01 -11,647.88 14,147.02 5,953,992.82 363,468.29 0.57 16,926.09 MWD+IFR-AK-CAZ-SC (5) 21,912.14 89.60 152.85 7,646.88 7,576.43 -11,733.29 14,190.27 5,953,906.57 363,509.82 0.69 17,021.80 MWD+IFR-AK-CAZ-SC (5) 22,006.41 89.68 153.24 7,647.48 7,577.03 -11,817.31 14,233.00 5,953,821.71 363,550.85 0.42 17,116.06 MWD+IFR-AK-CAZ-SC (5) 22,102.55 89.46 154.22 7,648.20 7,577.75 -11,903.52 14,275.55 5,953,734.67 363,591.66 1.04 17,212.15 MWD+IFR-AK-CAZ-SC (5) 22,196.50 89.94 152.85 7,648.69 7,578.24 -11,987.62 14,317.41 5,953,649.76 363,631.83 1.55 17,306.06 MWD+IFR-AK-CAZ-SC (5) 22,291.55 88.93 153.81 7,649.63 7,579.18 -12,072.55 14,360.07 5,953,563.99 363,672.78 1.47 17,401.08 MWD+IFR-AK-CAZ-SC (5) 12/5+2016 10:35:53AM Page 8 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) 0 (usft) (usft) (usft) (usft) (ft) (ft) (x/11001 (ft) Survey Tool Name 22,387.41 87.76 153.13 7,652.40 7,581.95 -12,158.28 14,402.87 5,953,477.43 363,713.85 1.41 17,496.86 MWD+IFR-AK-CAZ-SC (5) 22,482.42 86.16 154.14 7,657.43 7,586.98 -12,243.28 14,445.01 5,953,391.61 363,754.27 1.99 17,591.70 MWD+IFR-AK-CAZ-SC (5) 22,577.92 85.72 154.23 7,664.20 7,593.75 -12,329.04 14,486.49 5,953,305.05 363,794.02 0.47 17,686.89 MWD+IFR-AK-CAZ-SC (5) 22,673.00 86.03 153.56 7,671.04 7,600.59 -12,414.20 14,528.22 5,953,219.08 363,834.03 0.77 17,781.67 MWD+IFR-AK-CAZ-SC (5) 22,769.07 86.91 151.81 7,676.95 7,606.50 -12,499.39 14,572.22 5,953,133.03 363,876.31 2.04 17,877.55 MWD+IFR-AK-CAZ-SC (5) 22,863.71 87.17 152.23 7,681.84 7,611.39 -12,582.85 14,616.56 5,953,048.69 363,918.97 0.52 17,972.06 MWD+IFR-AK-CAZ-SC (5) 22,959.78 88.02 150.53 7,685.87 7,615.42 -12,667.11 14,662.53 5,952,963.54 363,963.24 1.98 18,068.03 MWD+IFR-AK-CAZ-SC (5) 23,054.67 89.55 149.79 7,687.88 7,617.43 -12,749.40 14,709.74 5,952,880.33 364,008.78 1.79 18,162.85 MWD+IFR-AK-CAZ-SC (5) 23,150.22 90.20 148.86 7,688.09 7,617.64 -12,831.57 14,758.48 5,952,797.20 364,055.87 1.19 18,258.29 MWD+IFR-AK-CAZ-SC (5) 23,245.63 90.44 148.39 7,687.56 7,617.11 -12,913.03 14,808.15 5,952,714.77 364,103.90 0.55 18,353.54 MWD+IFR-AK-CAZ-SC (5) 23,341.14 90.43 148.62 7,686.83 7,616.38 -12,994.47 14,858.05 5,952,632.35 364,152.15 0.24 18,448.87 MWD+IFR-AK-CAZ-SC (5) 23,436.29 90.50 147.48 7,686.06 7,615.61 -13,075.20 14,908.40 5,952,550.64 364,200.87 1.20 18,543.79 MWD+IFR-AK-CAZ-SC (5) 23,531.66 90.40 148.68 7,685.31 7,614.86 -13,156.15 14,958.82 5,952,468.70 364,249.65 1.26 18,638.93 MWD+IFR-AK-CAZ-SC (5) 23,627.17 90.50 148.17 7,684.56 7,614.11 -13,237.51 15,008.83 5,952,386.36 364,298.02 0.54 18,734.25 MWD+IFR-AK-CAZ-SC (5) 23,722.45 90.61 147.18 7,683.64 7,613.19 -13,318.02 15,059.78 5,952,304.85 364,347.34 1.05 18,829.25 MWD+IFR-AK-CAZ-SC (5) 23,818.08 90.20 147.00 7,682.96 7,612.51 -13,398.30 15,111.73 5,952,223.55 364,397.67 0.47 18,924.53 MWD+IFR-AK-CAZ-SC (5) 23,912.47 89.33 146.87 7,683.35 7,612.90 -13,477.41 15,163.23 5,952,143.44 364,447.57 0.93 19,018.55 MWD+IFR-AK-CAZ-SC (5) 24,008.43 88.55 146.42 7,685.12 7,614.67 -13,557.55 15,215.98 5,952,062.26 364,498.70 0.94 19,114.07 MWD+IFR-AK-CAZ-SC (5) 24,054.81 89.52 146.63 7,685.91 7,615.46 -13,596.23 15,241.56 5,952,023.08 364,523.49 2.14 19,160.23 MWD+IFR-AK-CAZ-SC (5) 24,152.88 89.58 143.63 7,686.68 7,616.23 -13,676.68 15,297.62 5,951,941.53 364,577.93 3.06 19,257.59 MWD+IFR-AK-CAZ-SC (6) 24,210.98 89.04 143.76 7,687.38 7,616.93 -13,723.49 15,332.02 5,951,894.03 364,611.38 0.96 19,315.07 MWD+IFR-AK-CAZ-SC (6) 24,307.25 87.77 144.22 7,690.06 7,619.61 -13,801.34 15,388.59 5,951,815.08 364,666.38 1.40 19,410.36 MWD+IFR-AK-CAZ-SC (6) 24,400.47 88.47 145.38 7,693.11 7,622.66 -13,877.47 15,442.30 5,951,737.89 364,718.54 1.45 19,502.80 MWD+IFR-AK-CAZ-SC (6) 24,495.14 89.89 145.91 7,694.47 7,624.02 -13,955.61 15,495.71 5,951,658.70 364,770.38 1.60 19,596.87 MWD+IFR-AK-CAZ-SC (6) 24,591.21 91.20 146.81 7,693.55 7,623.10 -14,035.59 15,548.93 5,951,577.68 364,821.98 1.65 19,692.47 MWD+IFR-AK-CAZ-SC (6) 24,686.38 92.09 146.46 7,690.82 7,620.37 -14,115.04 15,601.25 5,951,497.20 364,872.69 1.00 19,787.18 MWD+IFR-AK-CAZ-SC (6) 24,781.66 88.25 144.74 7,690.54 7,620.09 -14,193.64 15,655.07 5,951,417.55 364,924.92 4.42 19,881.85 MWD+IFR-AK-CAZ-SC (6) 24,876.98 89.08 147.46 7,692.76 7,622.31 -14,272.73 15,708.21 5,951,337.42 364,976.47 2.98 19,976.63 MWD+IFR-AK-CAZ-SC (6) 24,972.91 89.65 147.87 7,693.82 7,623.37 -14,353.77 15,759.52 5,951,255.36 365,026.13 0.73 20,072.28 MWD+IFR-AK-CAZ-SC (6) 25,067.52 90.11 149.19 7,694.02 7,623.57 -14,434.47 15,808.91 5,951,173.70 365,073.89 1.48 20,166.71 MWD+IFR-AK-CAZ-SC (6) 25,162.05 89.62 151.18 7,694.24 7,623.79 -14,516.48 15,855.91 5,951,090.77 365,119.24 2.17 20,261.19 MWD+IFR-AK-CAZ-SC (6) 25,258.05 88.92 153.15 7,695.47 7,625.02 -14,601.36 15,900.72 5,951,005.02 365,162.34 2.18 20,357.17 MWD+IFR-AK-CAZ-SC (6) 25,352.29 89.09 154.54 7,697.10 7,626.65 -14,685.94 15,942.26 5,950,919.63 365,202.17 1.49 20,451.35 MWD+IFR-AK-CAZ-SC (6) 25,448.78 89.85 155.27 7,698.00 7,627.55 -14,773.31 15,983.18 5,950,831.46 365,241.33 1.09 20,547.71 MWD+IFR-AK-CAZ-SC (6) 25,542.99 90.44 155.97 7,697.76 7,627.31 -14,859.12 16,022.07 5,950,744.89 365,278.49 0.97 20,641.73 MWD+IFR-AK-CAZ-SC (6) 25,639.81 90.45 155.89 7,697.01 7,626.56 -14,947.52 16,061.55 5,950,655.73 365,316.19 0.08 20,738.32 MWD+IFR-AK-CAZ-SC (6) 25,734.05 89.75 155.16 7,696.84 7,626.39 -15,033.29 16,100.60 5,950,569.20 365,353.51 1.07 20,832.38 MWD+IFR-AK-CAZ-SC (6) 25,829.81 89.26 155.35 7,697.67 7,627.22 -15,120.25 16,140.68 5,950,481.46 365,391.83 0.55 20,927.98 MWD+IFR-AK-CAZ-SC (6) 25,925.05 89.34 155.68 7,698.83 7,628.38 -15,206.92 16,180.15 5,950,394.02 365,429.56 0.36 21,023.03 MWD+IFR-AK-CAZ-SC (6) 26,020.23 89.12 156.05 7,700.11 7,629.66 -15,293.77 16,219.06 5,950,306.41 365,466.72 0.45 21,117.99 MWD+IFR-AK-CAZ-SC (6) 12/512016 10:35.53AM Page 9 COMPASS 5000.1 Burd 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey 1ZWO16 10:35:53AM Page 10 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting ALS Section (usft) (°) (Q) (usft) (usft) (usft) (usft) (ft) (ft) 011001) (ft) Survey Tool Name 26,115.95 89.80 157.62 7,701.01 7,630.56 -15,381.77 16,256.71 5,950,217.69 365,502.60 1.79 21,213.36 MWD+IFR-AK-CAZ-SC (6) 26,210.73 89.50 157.48 7,701.59 7,631.14 -15,469.36 16,292.91 5,950,129.39 365,537.03 0.35 21,307.69 MWD+IFR-AK-CAZ-SC (6) 26,306.42 89.51 156.70 7,702.42 7,631.97 -15,557.50 16,330.16 5,950,040.53 365,572.50 0.82 21,403.00 MWD+IFR-AK-CAZ-SC (6) 26,401.88 89.61 156.84 7,703.15 7,632.70 -15,645.22 16,367.81 5,949,952.08 365,608.38 0.18 21,498.13 MWD+IFR-AK-CAZ-SC (6) 26,495.47 89.69 156.57 7,703.72 7,633.27 -15,731.18 16,404.82 5,949,865.41 365,643.66 0.30 21,591.40 MWD+IFR-AK-CAZ-SC (6) 26,592.93 88.99 155.83 7,704.85 7,634.40 -15,820.34 16,444.14 5,949,775.48 365,681.19 1.05 21,688.59 MWD+IFR-AK-CAZ-SC (6) 26,685.50 88.85 155.84 7,706.59 7,636.14 -15,904.79 16,482.03 5,949,690.30 365,717.38 0.15 21,780.94 MWD+IFR-AK-CAZ-SC (6) 26,781.13 88.89 155.16 7,708.48 7,638.03 -15,991.79 16,521.68 5,949,602.53 365,755.27 0.71 21,876.37 MWD+IFR-AK-CAZ-SC (6) 26,877.15 89.00 154.03 7,710.25 7,639.80 -16,078.51 16,562.87 5,949,515.01 365,794.71 1.18 21,972.28 MWD+IFR-AK-CAZ-SC (6) 26,971.81 88.54 153.04 7,712.28 7,641.83 -16,163.23 16,605.04 5,949,429.47 365,835.17 1.15 22,066.88 MWD+IFR-AK-CAZ-SC (6) 27,067.89 88.55 153.11 7,714.72 7,644.27 -16,248.86 16,648.54 5,949,342.98 365,876.94 0.07 22,162.91 MWD+IFR-AK-CAZ-SC (6) 27,070.93 88.55 153.11 7,714.79 7,644.34 -16,251.58 16,649.91 5,949,340.24 365,878.26 0.00 22,165.95 PROJECTED to TD 4-112" x 6-3/4" 27,128.00 88.55 153.11 7,716.24 7,645.79 -16,302.46 16,675.71 5,949,288.86 365,903.04 0.00 22,222.99 PROJECTED to TO 1ZWO16 10:35:53AM Page 10 COMPASS 5000.1 Build 74 i Cement Detail Report CD5-99 String: Conductor Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Conductor Cement Cementing Start Date 4/17/2016 06:00 Cementing End Date 4/17/2016 08:00 Wellbore Name CD5-99A Comment Cement Stages Stage # 1 Description Conductor Cement Objective Top Depth (ftKB) 36.6 Bottom Depth (ftKB) 115.0 Full Return? No Vol Cement... Top Plug? No Btm Plug? No Q Pump [nit (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) I Rotated? No I Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Cone Unit label Page 1/1 Report Printed: 1/3/2017 Cement Detail Report CD5-99 String: Surface Casing Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Cementing Start Date Cementing End Date IlWellbore Name Surface Casing Cement 8/30/2016 13:00 8/30/2016 16:00 CD5-99A Comment Cemented with full returns. 165 bbls good cement to surface. Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Surface Casing Cement 36.6 I 2,337.1 Yes 165.0 Yes Yes Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) I Rotated? I Pipe RPM (rpm) 8 3 6 420.0 950.0 Yes 1 8.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Lead Cement 36.6 1,837.0 846 LiteCRETE 288.0 Yield (fN/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) CmprStr 1 (psi) 1.91 6.79 0.00 11.00 220.0 5.50 50.0 Additives Additive Type Concentration Conc Unit label D046 0.2 %BWOC Additive Type Concentration Conc Unit label D167 0.5 %BWOC Additive Type Concentration Conc Unit label D185 0.06 gal/sx Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Tail Cement 1,837.0 2,337.1 240 G 50.5 Yield (ft°/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.09 0.00 15.80 102.0 5.00 200.0 Additives Additive Type Concentration Conc Unit label D046 0.2 %BWOC Additive Type Concentration Conc Unit label D065 0.3 %BWOC Additive Type Concentration Conc Unit label D167 0.4 %BWOC Page 1/1 ReportPrinted: 1/3/2017 Cement Detail Report >„ CD5-99 String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 10/13/2016 09:00 10/13/2016 15:00 CD5-99A Comment Cemented with full returns Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing 13,854.0 15,570.6 Yes Yes Yes Cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 7 580.0 670.0 No No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Flood lines with water, test lines to 3800 psi. SLB pumped 41 bbl of 12.5 ppg Mud Push II. Drop bottom plug. SLB pumped 154.5 bbl of 15.8 ppg cement. Drop top plug. SLB kick out with 20 bbl water, rig displaced with 6892 strokes to bump plug (694 bbl). CIP @ 11:50 hrs, no losses. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 15.8 ppg Class G 13,854.0 15,570.6 734 G 154.5 intermediate cement Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.07 0.00 15.80 128.0 0.00 500.0 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Conc Unit label Retarder ID177 0.02 gal/sx Stage # 2 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing5,958.0 6,708.0 Yes Yes No Cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 7 360.0 760.0 No I I No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) 6,707.0 PDC bit 6,711.5 6 3/4 Comment Peform 2nd stage cement job. Flood cement lines, pressure test to 3000 psi. SLB pumped 42 bbl 12.5 ppg MudPush II, 65 bbl 15.8 ppg cement. Drop closing plug. SLB kick out with 20.2 bbl water, rig displaced with 2867 stks (288 bbl). Bumped plug and pressure up to 1900 psi, held 5 minutes. Bleed pressure and check floats - good. CIP @ 14:34 hrs. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 15.8 ppg Class G 5,958.0 6,708.0 311 G 41.9 intermediate cement Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.09 0.00 15.80 162.0 0.00 500.0 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Page 1/1 Report Printed: 1/3/2017 Originated: Schlumberger PTS - PRINT CENTER 6411 A Street Anchorage, AK 99518 (907) 273-1700 main 1 6 1 22 �i�l`��® 2704 2780a 27808 R Delivered to: • 7 -Dec -16 DEC 0 7 2016 b YMakana K Bender o�De��s �woa 1% Natural Resources Technician II AOGCC Alaska Oil & Gas Conservation Commission DATA LOGGED 333 W 7'-. Ave, Suite 100 Anchorage, fY 99501 Q- Aq /201 C, wl K. BENDER (907)273-4760fax WELL NAME API # 50-103-20425-00 SERVICE ORDER Mmw # Egg-T.n. FIELD NAME SERVICE DESCRIPTION DELIVERABLE DESCRIPTION DATA TYPE DATE LOGGED Color Prints CD's i I1 • ® . 00 Transmittal Receipt A Transmittal Receipt signature confirms that a package (box, envelope, etc.) has been received and the contents of the X package have been verified to match the media noted above. The Print Name Signature Date specific content of the CDs and/or hardcopy prints may or may Please send signed transmittal to CPAI via email or post. not have been verified for correctness or quality level at this Tom.Osterkamp@conocophillips.com point. Tom Osterkamo. Conoco Phillips Alaska Inc. JSLB Auditor - 7Y;,,) Customer: Well No: Job#: 9IVED DEC 08 2016 ConocoPhillips Alaska CD5-99A 16AKA0116 Dispatched To: Date Dispatched Dispatched By: 21 61 22 27 79 8 Transmittal #: 07DEC16-SP02 DATA LOGGED \Z /(y/201Cq M K. BENDER AOGCC: Makana Bender 7 -Dec -16 Stephanie Pacillo Well / Product Hardcopy Digital Copy E -Delivery Date Color Log Prints: 4 Contents on CD N/A Scope Resistivity Scope Resistivity 2" MD 2" ND 5" MD x x x x x x Scope Resistivity Scope Resistivity 5' ND x x LAS Digital Data N/A Contents on CD x Directional Data 1 Contents on CD Nad27 x As -Built Survey 1 Contents on CD Nad83 x EOW CD 1 Contents on CD Data: DLIS_/ASCII x x Graphics: pdf Survey: pdf/ txt x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkamp(a)conocophillips.com Alaska PTSPrintCenter(a)slb.com Attn-. Tom Osterkamp Attn: Stephanie Pacillo 907-263-4795 Received By: CEIVED 21 E 1 22 27 79 8 JCC 08 2011 AOGC1C FINAL NADConversion Western North Slope CD5 Alpine West Pad CD5-99A CD5-99A Definitive Survey Report 05 December, 2016 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor 5,965,920.93 usft Latitude: 70° 18' 50.421 N 349,558.53 usft Longitude: 151° 13' 9.507 W usft Ground Level: 33.90 usft Declination Dip Angle Field Strength (o) V) (nT) 17.52 80.81 57,510 Design CD5-99A Date Well CD5-99 From Well Position +N/ -S 0.00 usft Northing: Phase: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: +E/ -W Direction 500.00 CD5-99 Svy1 - SLB_NSG-SSHOT (CD5- (usft) (usft) (usft) (I Wellbore CD5-99A 0.00 Magnetics Model Name Sample Date 2,354.63 CD5-99A Svy1 - SLB_INC+Filler (CD5-99 BGGM2016 10/1/2016 5,965,920.93 usft Latitude: 70° 18' 50.421 N 349,558.53 usft Longitude: 151° 13' 9.507 W usft Ground Level: 33.90 usft Declination Dip Angle Field Strength (o) V) (nT) 17.52 80.81 57,510 Design CD5-99A Date Audit Notes: From To Version: 1.0 Phase: ACTUAL Tie On Depth: 2,270.51 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction 500.00 CD5-99 Svy1 - SLB_NSG-SSHOT (CD5- (usft) (usft) (usft) (I 572.96 36.55 0.00 0.00 152.00 Survey Program Date From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 100.00 500.00 CD5-99 Svy1 - SLB_NSG-SSHOT (CD5- GYD-GC-SS Gyrodata gyro single shots 8/28/2016 11:46: 572.96 2,270.51 CD5-99 Svy2 - SLB_MWD_GMAG (CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/28/2016 11:55: 2,354.63 2,354.63 CD5-99A Svy1 - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer+ known azi trend 10/1/2016 11:11: 2,400.38 15,515.86 CD5-99A Svy2 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/1/2016 11:23: 15,596.06 24,054.81 CD5-99A Svy3 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/15/2016 2:37 24,115.15 27,067.89 CD5-99A Svy4 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/25/2016 9:5f Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (I (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.90 0.00 0.00 5,965,920.93 349,558.53 0.00 0.00 UNDEFINED 100.00 0.35 80.47 100.00 29.55 0.03 0.19 5,965,920.96 349,558.72 0.55 0.06 GYD-GC-SS (1) 200.00 0.30 136.60 200.00 129.55 -0.11 0.67 5,965,920.81 349,559.20 0.31 0.41 GYD-GC-SS (1) 300.00 0.42 180.43 300.00 229.55 -0.66 0.85 5,965,920.25 349,559.36 0.29 0.99 GYD-GC-SS (1) 400.00 1.46 178.92 399.98 329.53 -2.30 0.87 5,965,918.61 349,559.35 1.04 2.44 GYD-GC-SS (1) 500.00 2.50 174.40 499.92 429.47 -5.75 1.11 5,965,915.16 349,559.52 1.05 5.60 GYD-GC-SS (1) 572.96 2.84 173.07 572.80 502.35 -9.13 1.48 5,965,911.78 349,559.83 0.47 8.75 MWD+IFR-AK-CAZ-SC (2) 659.55 3.53 165.66 659.26 588.81 -13.84 2.40 5,965,907.05 349,560.65 0.93 13.35 MWD+IFR-AK-CAZ-SC (2) 751.03 4.95 165.13 750.48 680.03 -20.38 4.11 5,965,900.47 349,562.23 1.55 19.93 MWD+IFR-AK-CAZ-SC (2) 845.81 7.79 162.16 844.67 774.22 -30.45 7.13 5,965,890.35 349,565.04 3.02 30.23 MWD+IFR-AK-CAZ-SC (2) 12/5/2016 10.35:53AM Page 2 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production 12/5/2016 10:35:53AM Page 3 COMPASS 5000.1 Build 74 Survey omMen app y Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 940.37 11.22 158.66 937.92 867.47 -45.12 12.44 5,965,875.57 349,570.06 3.68 45.68 MWD+IFR-AK-CAZ-SC (2) 1,034.58 13.28 155.03 1,029.98 959.53 -63.47 20.34 5,965,857.07 349,577.60 2.33 65.60 MWD+IFR-AK-CAZ-SC (2) 1.129.57 14.30 153.79 1,122.23 1,051.78 -83.89 30.13 5,965,836.46 349,586.97 1.12 88.22 MWD+IFR-AK-CAZ-SC (2) 1,222.50 14.94 150.97 1,212.15 1,141.70 -104.66 41.01 5,965,815.48 349,597.43 1.03 111.66 MWD+IFR-AK-CAZ-SC (2) 1,317.05 15.53 150.01 1,303.38 1,232.93 -126.28 53.26 5,965,793.62 349,609.24 0.68 136.50 MWD+IFR-AK-CAZ-SC (2) 1,410.15 17.57 146.48 1,392.62 1,322.17 -148.79 67.25 5,965,770.83 349,622.78 2.44 162.95 MWD+IFR-AK-CAZ-SC (2) 1,506.38 21.17 141.10 1,483.40 1,412.95 -174.44 86.19 5,965,744.82 349,641.20 4.17 194.48 MWD+IFR-AK-CAZ-SC (2) 1,600.00 23.81 137.20 1,569.89 1,499.44 -201.46 109.65 5,965,717.33 349,664.11 3.24 229.36 MWD+IFR-AK-CAZ-SC (2) 1,694.62 26.66 133.78 1,655.48 1,585.03 -230.17 137.96 5,965,688.06 349,691.84 3.38 268.00 MWD+IFR-AK-CAZ-SC (2) 1,788.88 29.81 132.16 1,738.51 1,668.06 -260.54 170.60 5,965,657.05 349,723.86 3.44 310.13 MWD+IFR-AK-CAZ-SC (2) 1,882.95 32.44 130.76 1,819.04 1,748.59 -292.71 207.05 5,965,624.15 349,759.66 2.90 355.65 MWD+IFR-AK-CAZ-SC (2) 1,976.79 33.94 130.25 1,897.56 1,827.11 -326.07 246.11 5,965,590.02 349,798.04 1.63 403.45 MWD+IFR-AK-CAZ-SC (2) 2,070.83 35.82 129.12 1,974.71 1,904.26 -360.40 287.50 5,965,554.87 349,838.73 2.11 453.19 MWD+IFR-AK-CAZ-SC (2) 2,165.49 37.79 127.90 2,050.50 1,980.05 -395.70 331.88 5,965,518.69 349,882.39 2.22 505.19 MWD+IFR-AK-CAZ-SC (2) 2,259.49 40.14 127.23 2,123.58 2,053.13 -431.72 378.74 5,965,481.74 349,928.52 2.54 559.00 MWD+IFR-AK-CAZ-SC (2) 2,270.51 40.86 126.48 2,131.96 2,061.51 -436.02 384.47 5,965,477.33 349,934.15 7.89 565.48 MWD+IFR-AK-CAZ-SC (2) Tie On - 10-3/4" x 13-1/2" 2,354.63 39.48 125.36 2,196.24 2,125.79 -467.85 428.40 5,965,444.62 349,977.44 1.85 614.21 INC+TREND (3) 2,400.38 38.27 124.71 2,231.85 2,161.40 -484.34 451.91 5,965,427.67 350,000.61 2.79 639.81 MWD+IFR-AK-CAZ-SC (4) 2,449.55 39.97 124.54 2,270.00 2,199.55 -501.97 477.44 5,965,409.54 350,025.78 3.46 667.35 MWD+IFR-AK-CAZ-SC (4) 2,496.41 42.85 122.76 2,305.14 2,234.69 -519.13 503.25 5,965,391.87 350,051.24 6.64 694.62 MWD+IFR-AK-CAZ-SC (4) 2,543.50 45.60 122.60 2,338.88 2,268.43 -536.86 530.89 5,965,373.59 350,078.52 5.84 723.25 MWD+IFR-AK-CAZ-SC (4) 2,590.10 47.02 122.20 2,371.07 2,300.62 -554.91 559.34 5,965,354.97 350,106.60 3.11 752.55 MWD+IFR-AK-CAZ-SC (4) 2,638.47 48.78 121.65 2,403.50 2,333.05 -573.89 589.80 5,965,335.39 350,136.67 3.74 783.61 MWD+IFR-AK-CAZ-SC (4) 2,685.65 50.29 121.67 2,434.12 2,363.67 -592.73 620.35 5,965,315.94 350,166.83 3.20 814.58 MWD+IFR-AK-CAZ-SC (4) 2,733.47 52.01 121.23 2,464.11 2,393.66 -612.15 652.12 5,965,295.88 350,198.21 3.67 846.65 MWD+IFR-AK-CAZ-SC (4) 2,781.44 53.64 120.35 2,493.10 2,422.65 -631.72 684.96 5,965,275.66 350,230.64 3.70 879.34 MWD+IFR-AK-CAZ-SC (4) 2,827.79 55.19 120.21 2,520.07 2,449.62 -650.72 717.51 5,965,256.01 350,262.80 3.35 911.40 MWD+IFR-AK-CAZ-SC (4) 2,873.78 56.60 120.81 2,545.86 2,475.41 -670.06 750.31 5,965,236.03 350,295.21 3.25 943.88 MWD+IFR-AK-CAZ-SC (4) 2,921.08 57.79 121.21 2,571.48 2,501.03 -690.54 784.39 5,965,214.87 350,328.86 2.61 977.96 MWD+IFR-AK-CAZ-SC (4) 3,016.32 59.97 123.67 2,620.71 2,550.26 -734.28 853.17 5,965,169.76 350,396.76 3.18 1,048.87 MWD+IFR-AK-CAZ-SC (4) 3,061.84 61.29 123.58 2,643.03 2,572.58 -756.25 886.21 5,965,147.13 350,429.34 2.90 1,083.78 MWD+IFR-AK-CAZ-SC (4) 3,111.30 62.67 123.84 2,666.27 2,595.82 -780.48 922.53 5,965,122.18 350,465.16 2.83 1,122.22 MWD+IFR-AK-CAZ-SC (4) 3,157.34 64.23 123.66 2,686.85 2,616.40 -803.36 956.77 5,965,098.62 350,498.94 3.41 1,158.50 MWD+IFR-AK-CAZ-SC (4) 3,203.86 65.52 123.31 2,706.60 2,636.15 -826.60 991.90 5,965,074.69 350,533.59 2.86 1,195.51 MWD+IFR-AK-CAZ-SC (4) 3,299.05 65.99 123.09 2,745.69 2,675.24 -874.12 1,064.52 5,965,025.72 350,605.24 0.54 1,271.57 MWD+IFR-AK-CAZ-SC (4) 3,392.96 66.08 122.52 2,783.83 2,713.38 -920.62 1,136.65 5,964,977.80 350,676.42 0.56 1,346.48 MWD+IFR-AK-CAZ-SC (4) 3,487.44 65.97 122.70 2,822.22 2,751.77 -967.14 1,209.37 5,964,929.83 350,748.19 0.21 1,421.70 MWD+IFR-AK-CAZ-SC (4) 3,583.78 66.02 122.64 2,861.42 2,790.97 -1,014.65 1,283.45 5,964,880.85 350,821.30 0.08 1,498.42 MWD+IFR-AK-CAZ-SC (4) 3,677.93 66.02 121.78 2,899.68 2,829.23 -1,060.50 1,356.24 5,964,833.55 350,893.15 0.83 1,573.08 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10:35:53AM Page 3 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +El -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 3,770.86 66.02 121.62 2,937.45 2,867.00 -1,105.12 1,428.48 5,964,787.50 350,964.47 0.16 1,646.39 MWD+IFR-AK-CAZ-SC (4) 3,865.49 66.11 120.21 2,975.84 2,905.39 -1,149.55 1,502.68 5,964,741.59 351,037.77 1.37 1,720.46 MWD+IFR-AK-CAZ-SC (4) 3,959.41 66.09 119.23 3,013.89 2,943.44 -1,192.12 1,577.25 5,964,697.54 351,111.46 0.95 1,793.05 MWD+IFR-AK-CAZ-SC (4) 4,054.40 66.09 119.90 3,052.39 2,981.94 -1,234.97 1,652.78 5,964,653.19 351,186.11 0.64 1,866.34 MWD+IFR-AK-CAZ-SC (4) 4,147.49 66.12 119.78 3,090.10 3,019.65 -1,277.32 1,726.61 5,964,609.37 351,259.07 0.12 1,938.40 MWD+IFR-AK-CAZ-SC (4) 4,242.73 65.49 119.45 3,129.13 3,058.68 -1,320.25 1,802.13 5,964,564.94 351,333.72 0.73 2,011.76 MWD+IFR-AK-CAZ-SC (4) 4,337.15 65.55 118.48 3,168.26 3,097.81 -1,361.86 1,877.32 5,964,521.83 351,408.04 0.94 2,083.80 MWD+IFR-AK-CAZ-SC (4) 4,430.83 65.43 119.60 3,207.12 3,136.67 -1,403.23 1,951.84 5,964,478.98 351,481.72 1.10 2,155.32 MWD+IFR-AK-CAZ-SC (4) 4,526.10 65.57 119.96 3,246.63 3,176.18 -1,446.29 2,027.08 5,964,434.42 351,556.07 0.37 2,228.66 MWD+IFR-AK-CAZ-SC (4) 4,619.67 65.37 119.87 3,285.48 3,215.03 -1,488.75 2,100.86 5,964,390.50 351,628.99 0.23 2,300.78 MWD+IFR-AK-CAZ-SC (4) 4,714.13 65.56 118.38 3,324.71 3,254.26 -1,530.57 2,175.93 5,964,347.19 351,703.19 1.45 2,372.95 MWD+IFR-AK-CAZ-SC (4) 4,809.66 65.41 118.91 3,364.34 3,293.89 -1,572.23 2,252.21 5,964,304.01 351,778.62 0.53 2,445.55 MWD+IFR-AK-CAZ-SC (4) 4,903.76 65.46 118.93 3,403.46 3,333.01 -1,613.62 2,327.12 5,964,261.13 351,852.68 0.06 2,517.26 MWD+IFR-AK-CAZ-SC (4) 4,997.13 65.61 118.54 3,442.13 3,371.68 -1,654.48 2,401.64 5,964,218.79 351,926.36 0.41 2,588.32 MWD+IFR-AK-CAZ-SC (4) 5,091.58 65.85 118.35 3,480.95 3,410.50 -1,695.49 2,477.35 5,964,176.27 352,001.22 0.31 2,660.07 MWD+IFR-AK-CAZ-SC (4) 5,186.76 65.98 118.27 3,519.80 3,449.35 -1,736.70 2,553.85 5,964,133.54 352,076.88 0.16 2,732.37 MWD+IFR-AK-CAZ-SC (4) 5,279.36 65.94 118.31 3,557.52 3,487.07 -1,776.78 2,628.31 5,964,091.98 352,150.52 0.06 2,802.72 MWD+IFR-AK-CAZ-SC (4) 5,375.09 65.80 118.22 3,596.65 3,526.20 -1,818.15 2,705.26 5,964,049.08 352,226.62 0.17 2,875.37 MWD+IFR-AK-CAZ-SC (4) 5,469.64 65.82 118.03 3,635.40 3,564.95 -1,858.81 2,781.33 5,964,006.91 352,301.85 0.18 2,946.98 MWD+IFR-AK-CAZ-SC (4) 5,562.68 65.72 118.69 3,673.58 3,603.13 -1,899.11 2,855.99 5,963,965.13 352,375.68 0.66 3,017.62 MWD+IFR-AK-CAZ-SC (4) 5,656.11 65.52 118.69 3,712.15 3,641.70 -1,939.96 2,930.64 5,963,922.79 352,449.49 0.21 3,088.73 MWD+IFR-AK-CAZ-SC (4) 5,751.20 65.37 118.51 3,751.66 3,681.21 -1,981.36 3,006.57 5,963,879.88 352,524.58 0.23 3,160.94 MWD+IFR-AK-CAZ-SC (4) 5,845.38 65.39 117.03 3,790.90 3,720.45 -2,021.25 3,082.33 5,963,838.48 352,599.51 1.43 3,231.73 MWD+IFR-AK-CAZ-SC (4) 5,939.38 65.59 116.84 3,829.90 3,759.45 -2,060.00 3,158.58 5,963,798.22 352,674.97 0.28 3,301.73 MWD+IFR-AK-CAZ-SC (4) 6,033.53 65.51 117.08 3,868.87 3,798.42 -2,098.85 3,234.97 5,963,757.84 352,750.56 0.25 3,371.90 MWD+IFR-AK-CAZ-SC (4) 6,127.05 65.97 117.21 3,907.29 3,836.84 -2,137.75 3,310.84 5,963,717.43 352,825.63 0.51 3,441.87 MWD+IFR-AK-CAZ-SC (4) 6,220.59 66.04 117.69 3,945.33 3,874.88 -2,177.15 3,386.68 5,963,676.53 352,900.65 0.47 3,512.25 MWD+IFR-AK-CAZ-SC (4) 6,315.27 65.97 118.38 3,983.83 3,913.38 -2,217.80 3,463.02 5,963,634.36 352,976.17 0.67 3,583.99 MWD+IFR-AK-CAZ-SC (4) 6,409.67 66.13 118.52 4,022.15 3,951.70 -2,258.90 3,538.88 5,963,591.75 353,051.18 0.22 3,655.89 MWD+IFR-AK-CAZ-SC (4) 6,503.79 66.01 118.96 4,060.33 3,989.88 -2,300.27 3,614.31 5,963,548.88 353,125.76 0.45 3,727.83 MWD+IFR-AK-CAZ-SC (4) 6,597.09 65.42 119.01 4,098.70 4,028.25 -2,341.48 3,688.70 5,963,506.20 353,199.30 0.63 3,799.14 MWD+IFR-AK-CAZ-SC (4) 6,691.36 65.60 118.33 4,137.78 4,067.33 -2,382.63 3,763.97 5,963,463.54 353,273.73 0.68 3,870.82 MWD+IFR-AK-CAZ-SC (4) 6,785.93 65.05 117.50 4,177.26 4,106.81 -2,422.87 3,839.91 5,963,421.80 353,348.84 0.99 3,941.99 MWD+IFR-AK-CAZ-SC (4) 6,880.32 64.95 118.47 4,217.15 4,146.70 -2,463.01 3,915.45 5,963,380.16 353,423.55 0.94 4,012.90 MWD+IFR-AK-CAZ-SC (4) 6,974.08 65.54 119.25 4,256.42 4,185.97 -2,504.10 3,990.02 5,963,337.58 353,497.28 0.98 4,084.19 MWD+IFR-AK-CAZ-SC (4) 7,068.23 65.52 119.63 4,295.41 4,224.96 -2,546.22 4,064.64 5,963,293.97 353,571.04 0.37 4,156.42 MWD+IFR-AK-CAZ-SC (4) 7,163.21 65.53 120.14 4,334.76 4,264.31 -2,589.30 4,139.59 5,963,249.41 353,645.11 0.49 4,229.63 MWD+IFR-AK-CAZ-SC (4) 7,254.95 65.55 119.82 4,372.75 4,302.30 -2,631.02 4,211.93 5,963,206.25 353,716.58 0.32 4,300.44 MWD+IFR-AK-CAZ-SC (4) 7,349.11 65.49 120.15 4,411.77 4,341.32 -2,673.85 4,286.15 5,963,161.94 353,789.93 0.33 4,373.10 MWD+IFR-AK-CAZ-SC (4) 7,443.24 65.53 120.53 4,450.79 4,380.34 -2,717.12 4,360.08 5,963,117.20 353,862.97 0.37 4,446.01 MWD+IFR-AK-CAZ-SC (4) 1215/2016 10: 35 53A Page 4 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD 7VDSS +N1 -S +E/ -W Northing Easting OLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,537.81 65.62 121.26 4,489.89 4,419.44 -2,761.33 4,433.97 5,963,071.52 353,935.95 0.71 4,519.74 MWD+IFR-AK-CAZ-SC (4) 7,631.19 65.55 121.92 4,528.49 4,458.04 -2,805.88 4,506.40 5,963,025.54 354,007.47 0.65 4,593.07 MWD+IFR-AK-CAZ-SC (4) 7,723.34 65.59 121.62 4,566.60 4,496.15 -2,850.05 4,577.73 5,962,979.95 354,077.90 0.30 4,665.56 MWD+IFR-AK-CAZ-SC (4) 7,818.15 65.53 121.19 4,605.83 4,535.38 -2,895.03 4,651.40 5,962,933.51 354,150.64 0.42 4,739.85 MWD+IFR-AK-CAZ-SC (4) 7,913.03 65.50 120.34 4,645.15 4,574.70 -2,939.19 4,725.59 5,962,887.87 354,223.93 0.82 4,813.69 MWD+IFR-AK-CAZ-SC (4) 8,006.35 65.49 119.93 4,683.86 4,613.41 -2,981.82 4,799.03 5,962,843.78 354,296.50 0.40 4,885.80 MWD+IFR-AK-CAZ-SC (4) 8,101.59 65.59 118.86 4,723.30 4,652.85 -3,024.37 4,874.56 5,962,799.73 354,371.15 1.03 4,958.83 MWD+IFR-AK-CAZ-SC (4) 8,194.58 65.58 119.13 4,761.73 4,691.28 -3,065.42 4,948.62 5,962,757.21 354,444.37 0.26 5,029.84 MWD+IFR-AK-CAZ-SC (4) 8,290.23 65.53 119.28 4,801.31 4,730.86 -3,107.91 5,024.63 5,962,713.21 354,519.51 0.15 5,103.04 MWD+IFR-AK-CAZ-SC (4) 8,384.19 65.40 119.02 4,840.33 4,769.88 -3,149.54 5,099.28 5,962,670.09 354,593.30 0.29 5,174.85 MWD+IFR-AK-CAZ-SC (4) 8,477.96 65.40 118.57 4,879.37 4,808.92 -3,190.61 5,173.99 5,962,627.54 354,667.17 0.44 5,246.18 MWD+IFR-AK-CAZ-SC (4) 8,571.84 65.43 117.50 4,918.43 4,847.98 -3,230.73 5,249.34 5,962,585.92 354,741.70 1.04 5,316.98 MWD+IFR-AK-CAZ-SC (4) 8,665.25 65.65 116.91 4,957.10 4,886.65 -3,269.60 5,324.96 5,962,545.54 354,816.52 0.62 5,386.81 MWD+IFR-AK-CAZ-SC (4) 8,760.88 65.94 116.99 4,996.31 4,925.86 -3,309.13 5,402.71 5,962,504.46 354,893.46 0.31 5,458.21 MWD+IFR-AK-CAZ-SC (4) 8,855.16 66.00 117.54 5,034.70 4,964.25 -3,348.58 5,479.26 5,962,463.49 354,969.19 0.54 5,528.98 MWD+IFR-AK-CAZ-SC (4) 8,947.50 66.06 118.23 5,072.22 5,001.77 -3,388.04 5,553.83 5,962,422.55 355,042.96 0.69 5,598.83 MWD+IFR-AK-CAZ-SC (4) 9,041.26 66.16 118.79 5,110.19 5,039.74 -3,428.96 5,629.17 5,962,380.13 355,117.45 0.56 5,670.33 MWD+IFR-AK-CAZ-SC (4) 9,135.01 66.13 119.41 5,148.10 5,077.65 -3,470.66 5,704.08 5,962,336.94 355,191.51 0.61 5,742.32 MWD+IFR-AK-CAZ-SC (4) 9,230.32 66.03 119.16 5,186.75 5,116.30 -3,513.28 5,780.07 5,962,292.82 355,266.62 0.26 5,815.62 MWD+IFR-AK-CAZ-SC (4) 9,324.30 66.13 119.24 5,224.85 5,154.40 -3,555.19 5,855.06 5,962,249.41 355,340.75 0.13 5,887.83 MWD+IFR-AK-CAZ-SC (4) 9,417.28 66.00 118.27 5,262.58 5,192.13 -3,596.07 5,929.57 5,962,207.05 355,414.42 0.96 5,958.91 MWD+IFR-AK-CAZ-SC (4) 9,512.16 65.56 116.68 5,301.50 5,231.05 -3,635.99 6,006.33 5,962,165.60 355,490.36 1.60 6,030.19 MWD+IFR-AK-CAZ-SC (4) 9,604.38 65.43 116.53 5,339.75 5,269.30 -3,673.57 6,081.36 5,962,126.53 355,564.62 0.20 6,098.60 MWD+IFR-AK-CAZ-SC (4) 9,700.78 65.87 116.73 5,379.50 5,309.05 -3,712.94 6,159.87 5,962,085.60 355,642.31 0.49 6,170.21 MWD+IFR-AK-CAZ-SC (4) 9,793.87 65.46 118.06 5,417.86 5,347.41 -3,751.96 6,235.17 5,962,045.08 355,716.82 1.37 6,240.02 MWD+IFR-AK-CAZ-SC (4) 9,888.80 65.62 119.96 5,457.17 5,386.72 -3,793.87 6,310.74 5,962,001.67 355,791.52 1.83 6,312.50 MWD+IFR-AK-CAZ-SC (4) 9,982.62 66.04 120.86 5,495.58 5,425.13 -3,837.19 6,384.55 5,961,956.88 355,864.45 0.98 6,385.41 MWD+IFR-AK-CAZ-SC (4) 10,076.49 66.01 121.88 5,533.73 5,463.28 -3,881.84 6,457.79 5,961,910.78 355,936.77 0.99 6,459.21 MWD+IFR-AK-CAZ-SC (4) 10,169.41 66.16 122.87 5,571.40 5,500.95 -3,927.32 6,529.52 5,961,863.87 356,007.57 0.99 6,533.05 MWD+IFR-AK-CAZ-SC (4) 10,264.29 66.04 123.77 5,609.84 5,539.39 -3,974.97 6,602.01 5,961,814.78 356,079.08 0.88 6,609.15 MWD+IFR-AK-CAZ-SC (4) 10,358.35 66.03 124.16 5,648.04 5,577.59 -4,022.99 6,673.29 5,961,765.34 356,149.39 0.38 6,685.01 MWD+IFR-AK-CAZ-SC. (4) 10,451.09 65.99 122.80 5,685.75 5,615.30 -4,069.73 6,743.96 5,961,717.20 356,219.10 1.34 6,759.46 MWD+IFR-AK-CAZ-SC (4) 10,544.91 65.53 122.64 5,724.27 5,653.82 -4,115.97 6,815.94 5,961,669.53 356,290.13 0.51 6,834.08 MWD+IFR-AK-CAZ-SC (4) 10,639.55 65.46 121.68 5,763.52 5,693.07 -4,161.81 6,888.84 5,961,622.25 356,362.09 0.93 6,908.77 MWD+IFR-AK-CAZ-SC (4) 10,734.25 65.31 120.97 5,802.97 5,732.52 -4,206.57 6,962.38 5,961,576.03 356,434.72 0.70 6,982.82 MWD+IFR-AK-CAZ-SC (4) 10,828.68 65.51 121.04 5,842.26 5,771.81 -4,250.80 7,035.98 5,961,530.33 356,507.41 0.22 7,056.43 MWD+IFR-AK-CAZ-SC (4) 10,923.35 65.44 120.29 5,881.56 5,811.11 -4,294.73 7,110.06 5,961,484.93 356,580.59 0.72 7,129.99 MWD+IFR-AK-CAZ-SC (4) 11,018.15 65.38 119.51 5,921.01 5,850.56 -4,337.70 7,164.79 5,961,440.48 356,654.44 0.75 7,203.02 MWD+IFR-AK-CAZ-SC (4) 11,111.02 65.37 119.39 5,959.71 5,889.26 -4,379.21 7,258.31 5,961,397.51 356,727.10 0.12 7,274.18 MWD+IFR-AK-CAZ-SC (4) 11,204.74 65.57 118.45 5,998.62 5,928.17 -4,420.44 7,332.93 5,961,354.79 356,800.88 0.94 7,345.62 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10: 35 53A Page 5 COMPASS 5000 1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,298.23 65.56 117.64 6,037.29 5,966.84 -4,460.46 7,408.05 5,961,313.28 356,875.18 0.79 7,416.22 MWD+IFR-AK-CAZ-SC (4) 11,392.12 65.57 117.93 6,076.13 6,005.68 -4,500.30 7,483.68 5,961,271.93 356,949.99 0.28 7,486.91 MWD+IFR-AK-CAZ-SC (4) 11,484.54 65.30 118.06 6,114.55 6,044.10 -4,539.76 7,557.90 5,961,231.00 357,023.39 0.32 7,556.59 MWD+IFR-AK-CAZ-SC (4) 11,577.92 65.64 117.98 6,153.32 6,082.87 -4,579.67 7,632.89 5,961,189.60 357,097.57 0.37 7,627.03 MWD+IFR-AK-CAZ-SC (4) 11,673.36 65.52 117.73 6,192.78 6,122.33 -4,620.27 7,709.73 5,961 , 147.47 357,173.57 0.27 7,698.95 MWD+IFR-AK-CAZ-SC (4) 11,765.10 65.57 118.48 6,230.75 6,160.30 -4,659.61 7,783.39 5,961,106.66 357,246.42 0.75 7,768.27 MWD+IFR-AK-CAZ-SC (4) 11,860.16 65.60 119.08 6,270.05 6,199.60 -4,701.28 7,859.25 5,961,063.48 357,321.43 0.58 7,840.68 MWD+IFR-AK-CAZ-SC (4) 11,952.38 65.50 118.87 6,308.22 6,237.77 -4,741.95 7,932.70 5,961,021.35 357,394.04 0.23 7,911.07 MWD+IFR-AK-CAZ-SC (4) 12,046.87 65.51 118.68 6,347.39 6,276.94 -4,783.34 8,008.06 5,960,978.46 357,468.55 0.18 7,983.00 MWD+IFR-AK-CAZ-SC (4) 12,139.12 65.56 118.79 6,385.60 6,315.15 -4,823.71 8,081.69 5,960,936.63 357,541.35 0.12 8,053.21 MWD+IFR-AK-CAZ-SC (4) 12,233.31 66.14 118.41 6,424.13 6,353.68 -4,864.85 8,157.15 5,960,893.99 357,615.97 0.72 8,124.96 MWD+IFR-AK-CAZ-SC (4) 12,326.43 66.07 118.07 6,461.85 6,391.40 -4,905.14 8,232.15 5,960,852.21 357,690.14 0.34 8,195.74 MWD+IFR-AK-CAZ-SC (4) 12,422.58 66.04 117.55 6,500.88 6,430.43 -4,946.13 8,309.88 5,960,809.67 357,767.03 0.50 8,268.43 MWD+IFR-AK-CAZ-SC (4) 12,516.13 66.01 117.75 6,538,89 6,468.44 -4,985.80 8,385.60 5,960,768.50 357,841.93 0.20 8,339.00 MWD+IFR-AK-CAZ-SC (4) 12,610.15 65.95 117.93 6,577.16 6,506.71 -5,025.91 8,461.53 5,960,726.88 357,917.04 0.19 8,410.06 MWD+IFR-AK-CAZ-SC (4) 12,704.01 65.91 118.06 6,615.44 6,544.99 -5,066.13 8,537.21 5,960,685.15 357,991.89 0.13 8,481.10 MWD+IFR-AK-CAZ-SC (4) 12,797.27 65.94 117.44 6,653.49 6,583.04 -5,105.78 8,612.56 5,960,644.00 358,066.42 0.61 8,551.49 MWD+IFR-AK-CAZ-SC (4) 12,889.72 66.07 117.82 6,691.08 6,620.63 -5,144.95 8,687.39 5,960,603.35 358,140.45 0.40 8,621.20 MWD+IFR-AK-CAZ-SC (4) 12,984.74 66.11 117.20 6,729.59 6,659.14 -5,185.07 8,764.43 5,960,561.69 358,216.67 0.60 8,692.80 MWD+IFR-AK-CAZ-SC (4) 13,078.29 65.60 117.77 6,767.86 6,697.41 -5,224.47 8,840.16 5,960,520.79 358,291.59 0.78 8,763.14 MWD+IFR-AK-CAZ-SC (4) 13,171.16 65.52 118.60 6,806.28 6,735.83 -5,264.40 8,914.68 5,960,479.37 358,365.29 0.82 8,833.38 MWD+IFR-AK-CAZ-SC (4) 13,266.22 65.86 119.22 6,845.42 6,774.97 -5,306.28 8,990.52 5,960,435.98 358,440.26 0.69 8,905.96 MWD+IFR-AK-CAZ-SC (4) 13,359.66 65.96 118.69 6,883.56 6,813.11 -5,347.58 9,065.16 5,960,393.20 358,514.05 0.53 8,977.46 MWD+IFR-AK-CAZ-SC (4) 13,453.44 65.63 117.83 6,922.01 6,851.56 -5,388.08 9,140.50 5,960,351.21 358,588.56 0.91 9,048.59 MWD+IFR-AK-CAZ-SC (4) 13,547.24 65.50 119.12 6,960.81 6,890.36 -5,428.79 9,215.56 5,960,309.00 358,662.79 1.26 9,119.78 MWD+IFR-AK-CAZ-SC (4) 13,641.15 65.47 119.07 6,999.78 6,929.33 -5,470.34 9,290.22 5,960,265.97 358,736.60 0.06 9,191.52 MWD+IFR-AK-CAZ-SC (4) 13,734.37 65.54 118.83 7,038.43 6,967.98 -5,511.40 9,364.45 5,960,223.43 358,809.99 0.25 9,262.62 MWD+IFR-AK-CAZ-SC (4) 13,827.74 65.28 117.91 7,077.28 7,006.83 -5,551.74 9,439.16 5,960,181.60 358,883.86 0.94 9,333.31 MWD+IFR-AK-CAZ-SC (4) 13,921.59 65.19 118.28 7,116.60 7,046.15 -5,591.88 9,514.33 5,960,139.97 358,958.21 0.37 9,404.04 MWD+IFR-AK-CAZ-SC (4) 14,014.98 65.22 117.72 7,155.76 7,085.31 -5,631.68 9,589.19 5,960,098.68 359,032.25 0.55 9,474.33 MWD+IFR-AK-CAZ-SC (4) 14,109.07 65.26 118.12 7,195.17 7,124.72 -5,671.68 9,664.69 5,960,057.18 359,106.92 0.39 9,545.09 MWD+IFR-AK-CAZ-SC (4) 14,202.98 65.22 117.93 7,234.50 7,164.05 -5,711.75 9,739.96 5,960,015.61 359,181.38 0.19 9,615.81 MWD+IFR-AK-CAZ-SC (4) 14,296.25 65.75 118.61 7,273.20 7,202.75 -5,751.94 9,814.70 5,959,973.93 359,255.29 0.87 9,686.39 MWD+IFR-AK-CAZ-SC (4) 14,389.83 66.77 119.72 7,310.87 7,240.42 -5,793.69 9,889.50 5,959,930.70 359,329.23 1.54 9,758.36 MWD+IFR-AK-CAZ-SC (4) 14,483.30 68.61 119.67 7,346.36 7,275.91 -5,836.53 9,964.61 5,959,886.37 359,403.47 1.97 9,831.45 MWD+IFR-AK-CAZ-SC (4) 14,577.19 70.60 119.61 7,379.07 7,308.62 -5,880.05 10,041.10 5,959,841.33 359,479.06 2.12 9,905.78 MWD+IFR-AK-CAZ-SC (4) 14,671.64 74.36 118.47 7,407.50 7,337.05 -5,923.75 10,119.83 5,959,796.06 359,556.90 4.14 9,981.34 MWD+IFR-AK-CAZ-SC (4) 14,766.17 76.79 117.86 7,431.05 7,360.60 -5,966.96 10,200.54 5,959,751.25 359,636.71 2.65 10,057.37 MWD+IFR-AK-CAZ-SC (4) 14,858.93 79.19 118.06 7,450.35 7,379.90 -6,009.49 10,280.67 5,959,707.12 359,715.97 2.60 10,132.55 MWD+IFR-AK-CAZ-SC (4) 14,953.15 79.58 118.16 7,467.71 7,397.26 -6,053.13 10,362.35 5,959,661.86 359,796.76 0.43 10,209.43 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10: 35 53A Page 6 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey MD Inc Azi (usft) (°) (°) 15,046.95 79.69 119.36 15,141.26 79.67 119.78 15,233.58 80.53 120.85 15,327.33 81.34 123.18 15,420.95 81.98 126.10 15,515.86 82.57 128.99 15,570.58 85.13 131.47 7-5/8" x 9-718" by 11" TVD (usft) 7,484.58 7,501.48 7,517.35 7,532.12 7,545.71 7,558.47 7,564.33 TVDSS (usft) 7,414.13 7,431.03 7,446.90 7,461.67 7,475.26 7,488.02 7,493.88 +N/ -S (usft) -6,097.52 -6,143.31 -6,189.21 -6,238.29 -6,290.94 -6,348.25 -6,383.38 +E/ -W (usft) 10,443.24 10,523.94 10,602.45 10,680.94 10,757.14 10,831.70 10,873.22 Map Northing (ft) 5,959,615.86 5,959,568.46 5,959,521.00 5,959,470.36 5,959,416.20 5,959,357.42 5,959,321.46 Map Easting (ft) 359,876.73 359,956.49 360,034.06 360,111.54 360,186.67 360,260.06 360,300.87 DLS (°/100') 1.26 0.44 1.47 2.60 3.16 3.08 6.49 Vertical Section (ft) Survey Tool Name 10,286.60 MWD+IFR-AK-CAZ-SC (4) 10,364.91 MWD+IFR-AK-CAZ-SC (4) 10,442.30 MWD+IFR-AK-CAZ-SC (4) 10,522.48 MWD+IFR-AK-CAZ-SC (4) 10,604.74 MWD+IFR-AK-CAZ-SC (4) 10,690.34 MWD+IFR-AK-CAZ-SC (4) 10,740.86 ) 15,596.06 86.32 132.62 7,566.23 7,495.78 -6,400.40 10,892.09 5,959,304.07 360,319.39 6.49 10,764.74 MWD+IFR-AK-CAZ-SC (5) 15,624.47 87.57 132.14 7,567.75 7,497.30 -6,419.52 10,913.05 5,959,284.53 360,339.96 4.71 10,791.47 MWD+IFR-AK-CAZ-SC (5) 15,719.67 87.06 132.15 7,572.21 7,501.76 -6,483.33 10,983.56 5,959,219.33 360,409.17 0.54 10,880.91 MWD+IFR-AK-CAZ-SC (5) 15,816.56 87.18 132.78 7,577.07 7,506.62 -6,548.66 11,054.94 5,959,152.59 360,479.23 0.66 10,972.10 MWD+IFR-AK-CAZ-SC (5) 15,910.31 87.07 132.33 7,581.78 7,511.33 -6,611.98 11,123.91 5,959,087.90 360,546.91 0.49 11,060.40 MWD+IFR-AK-CAZ-SC (5) 16,005.46 87.20 133.48 7,586.53 7,516.08 -6,676.68 11,193.52 5,959,021.83 360,615.20 1.21 11,150.20 MWD+IFR-AK-CAZ-SC (5) 16,101.56 87.85 132.62 7,590.68 7,520.23 -6,742.22 11,263.68 5,958,954.90 360,684.03 1.12 11,241.00 MWD+IFR-AK-CAZ-SC (5) 16,195.64 89.19 133.54 7,593.11 7,522.66 -6,806.45 11,332.37 5,958,889.31 360,751.41 1.73 11,329.97 MWD+IFR-AK-CAZ-SC (5) 16,291.29 88.98 132.21 7,594.64 7,524.19 -6,871.52 11,402.45 5,958,822.85 360,820.18 1.41 11,420.32 MWD+IFR-AK-CAZ-SC (5) 16,385.89 89.93 133.55 7,595.54 7,525.09 -6,935.89 11,471.77 5,958,757.11 360,888.18 1.74 11,509.70 MWD+IFR-AK-CAZ-SC (5) 16,480.41 89.99 135.19 7,595.60 7,525.15 -7,001.98 11,539.33 5,958,689.68 360,954.40 1.74 11,599.77 MWD+IFR-AK-CAZ-SC (5) 16,575.56 89.86 136.48 7,595.73 7,525.28 -7,070.24 11,605.63 5,958,620.12 361,019.31 1.36 11,691.16 MWD+IFR-AK-CAZ-SC (5) 16,670.69 88.90 141.38 7,596.76 7,526.31 -7,142.08 11,668.23 5,958,547.04 361,080.46 5.24 11,783.99 MWD+IFR-AK-CAZ-SC (5) 16,766.40 89.44 146.55 7,598.15 7,527.70 -7,219.28 11,724.39 5,958,468.74 361,135.06 5.44 11,878.52 MWD+IFR-AK-CAZ-SC (5) 16,860.74 90.31 147.35 7,598.35 7,527.90 -7,298.35 11,775.84 5,958,388.65 361,184.91 1.25 11,972.49 MWD+IFR-AK-CAZ-SC (5) 16,956.67 90.23 146.42 7,597.90 7,527.45 -7,378.70 11,828.25 5,958,307.28 361,235.69 0.97 12,068.03 MWD+IFR-AK-CAZ-SC (5) 17,051.13 90.31 147.11 7,597.45 7,527.00 -7,457.71 11,880.02 5,958,227.26 361,285.87 0.74 12,162.10 MWD+IFR-AK-CAZ-SC (5) 17,148.13 89.56 149.30 7,597.56 7,527.11 -7,540.15 11,931.13 5,958,143.82 361,335.31 2.39 12,258.88 MWD+IFR-AK-CAZ-SC (5) 17,240.81 87.64 150.53 7,599.67 7,529.22 -7,620.32 11,977.57 5,958,062.74 361,380.13 2.28 12,351.47 MWD+IFR-AK-CAZ-SC (5) 17,336.50 87.75 150.23 7,603.35 7,532.90 -7,703.44 12,024.83 5,957,978.69 361,425.71 0.33 12,447.05 MWD+IFR-AK-CAZ-SC (5) 17,431.46 90.30 151.02 7,604.96 7,534.51 -7,786.17 12,071.40 5,957,895.05 361,470.61 2.81 12,541.96 MWD+IFR-AK-CAZ-SC (5) 17,527.24 90.95 152.13 7,603.92 7,533.47 -7,870.40 12,116.99 5,957,809.93 361,514.50 1.34 12,637.73 MWD+IFR-AK-CAZ-SC (5) 17,622.07 89.62 153.34 7,603.45 7,533.00 -7,954.69 12,160.43 5,957,724.80 361,556.24 1.90 12,732.55 MWD+IFR-AK-CAZ-SC (5) 17,716.24 89.93 151.78 7,603.82 7,533.37 -8,038.26 12,203.82 5,957,640.38 361,597.95 1.69 12,826.71 MWD+IFR-AK-CAZ-SC (5) 17,812.74 89.72 151.73 7,604.11 7,533.66 -8,123.27 12,249.49 5,957,554.48 361,641.90 0.22 12,923.21 MWD+IFR-AK-CAZ-SC (5) 17,907.72 88.74 151.93 7,605.39 7,534.94 -8,206.99 12,294.32 5,957,469.88 361,685.04 1.05 13,018.18 MWD+IFR-AK-CAZ-SC (5) 18,003.03 88.54 151.00 7,607.65 7,537.20 -8,290.70 12,339.84 5,957,385.28 361,728.87 1.00 13,113.45 MWD+IFR-AK-CAZ-SC (5) 18,098.68 88.68 151.04 7,609.97 7,539.52 -8,374.35 12,386.17 5,957,300.73 361,773.51 0.15 13,209.06 MWD+IFR-AK-CAZ-SC (5) 18,193.93 88.78 151.63 7,612.08 7,541.63 -8,457.90 12,431.85 5,957,216.28 361,817.50 0.63 13,304.28 MWD+IFR-AK-CAZ-SC (5) 18,288.94 89.27 152.24 7,613.70 7,543.25 -8,541.73 12,476.54 5,957,131.59 361,860.50 0.82 13,399.28 MWD+IFR-AK-CAZ-SC (5) 18,384.43 89.47 153.14 7,614.75 7,544.30 -8,626.57 12,520.35 5,957,045.89 361,902.60 0.97 13,494.75 MWD+IFR-AK-CAZ-SC (5) 18,480.69 90.03 152.57 7,615.17 7,544.72 -8,712.22 12,564.26 5,956;959.38 361,944.79 0.83 13,591.00 MWD+IFR-AK-CAZ-SC (5) 12/5/2016 10:35:53AM Page 7 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey 1215/2016 10:35:53AM Page 8 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting US Section (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 18.,576.20 89.71 153.04 7,615.39 7,544.94 -8,797.18 12,607.91 5,956,873.58 361,986.72 0.60 13,686.50 MWD+IFR-AK-CAZ-SC (5) 18,671.80 89.75 151.63 7,615.84 7,545.39 -8,881.84 12,652.30 5,956,788.04 362,029.40 1.48 13,782.10 MWD+IFR-AK-CAZ-SC (5) 18,767.80 89.82 152.07 7,616.20 7,545.75 -8,966.49 12,697.59 5,956,702.51 362,072.98 0.46 13,878.10 MWD+IFR-AK-CAZ-SC (5) 18,861.96 89.75 153.35 7,616.55 7,546.10 -9,050.16 12,740.76 5,956,617.99 362,114.47 1.36 13,972.25 MWD+IFR-AK-CAZ-SC (5) 18,957.52 89.22 152.95 7,617.41 7,546.96 -9,135.42 12,783.92 5,956,531.90 362,155.90 0.69 14,067.78 MWD+IFR-AK-CAZ-SC (5) 19,052.27 89.79 152.30 7,618.23 7,547.78 -9,219.55 12,827.48 5,956,446.91 362,197.77 0.91 14,162.52 MWD+IFR-AK-CAZ-SC (5) 19,148.41 89.43 152.40 7,618.88 7,548.43 -9,304.71 12,872.10 5,956,360.89 362,240.67 0.39 14,258.66 MWD+IFR-AK-CAZ-SC (5) 19,244.33 89.34 152.27 7,619.91 7,549.46 -9,389.66 12,916.63 5,956,275.07 362,283.49 0.16 14,354.57 MWD+IFR-AK-CAZ-SC (5) 19,339.86 89.16 151.97 7,621.16 7,550.71 -9,474.10 12,961.30 5,956,189.76 362,326.45 0.37 14,450.09 MWD+IFR-AK-CAZ-SC (5) 19,436.17 88.91 151.14 7,622.78 7,552.33 -9,558.77 13,007.17 5,956,104.20 362,370.61 0.90 14,546.38 MWD+IFR-AK-CAZ-SC (5) 19,531.99 89.49 150.20 7,624.12 7,553.67 -9,642.29 13,054.10 5,956,019.75 362,415.85 1.15 14,642.17 MWD+IFR-AK-CAZ-SC (5) 19,624.64 89.06 150.51 7,625.29 7,554.84 -9,722.81 13,099.92 5,955,938.34 362,460.05 0.57 14,734.77 MWD+IFR-AK-CAZ-SC (5) 19,722.54 88.74 151.43 7,627.17 7,556.72 -9,808.39 13,147.42 5,955,851.83 362,505.82 0.99 14,832.64 MWD+IFR-AK-CAZ-SC (5) 19,814.91 89.09 151.61 7,628.92 7,558.47 -9,889.57 13,191.46 5,955,769.79 362,548.22 0.43 14,924.99 MWD+IFR-AK-CAZ-SC (5) 19,909.92 89.76 151.88 7,629.88 7,559.43 -9,973.25 13,236.43 5,955,685.23 362,591.51 0.76 15,019.99 MWD+IFR-AK-CAZ-SC (5) 20,006.12 89.71 151.08 7,630.32 7,559.87 -10,057.78 13,282.36 5,955,599.81 362,635.73 0.83 15,116.18 MWD+IFR-AK-CAZ-SC (5) 20,101.20 90.02 150.62 7,630.55 7,560.10 -10,140.82 13,328.68 5,955,515.86 362,680.37 0.58 15,211.24 MWD+IFR-AK-CAZ-SC (5) 20,196.48 90.10 151.23 7,630.45 7,560.00 -10,224.09 13,374.98 5,955,431.69 362,724.99 0.65 15,306.51 MWD+IFR-AK-CAZ-SC (5) 20,292.68 89.47 151.56 7,630.81 7,560.36 -10,308.55 13,421.04 5,955,346.33 362,769.34 0.74 15,402.70 MWD+IFR-AK-CAZ-SC (5) 20,387.59 89.17 151.84 7,631.93 7,561.48 -10,392.11 13,466.03 5,955,261.89 362,812.65 0.43 15,497.60 MWD+IFR-AK-CAZ-SC (5) 20,482.78 88.57 151.47 7,633.81 7,563.36 -10,475.87 13,511.21 5,955,177.25 362,856.14 0.74 15,592.77 MWD+IFR-AK-CAZ-SC (5) 20,578.73 88.95 151.66 7,635.89 7,565.44 -10,560.22 13,556.89 5,955,092.00 362,900.12 0.44 15,688.70 MWD+IFR-AK-CAZ-SC (5) 20,674.03 89.61 150.34 7,637.08 7,566.63 -10,643.56 13,603.09 5,955,007.76 362,944.63 1.55 15,783.97 MWD+IFR-AK-CAZ-SC (5) 20,768.65 89.95 150.36 7,637.45 7,567.00 -10,725.79 13,649.90 5,954,924.61 362,989.78 0.36 15,878.55 MWD+IFR-AK-CAZ-SC (5) 20,864.50 90.17 150.51 7,637.35 7,566.90 -10,809.16 13,697.19 5,954,840.32 363,035.39 0.28 15,974.37 MWD+IFR-AK-CAZ-SC (5) 20,958.88 89.71 150.31 7,637.45 7,567.00 -10,891.23 13,743.79 5,954,757.34 363,080.34 0.53 16,068.71 MWD+IFR-AK-CAZ-SC (5) 21,057.19 89.19 150.71 7,638.39 7,567.94 -10,976.80 13,792.19 5,954,670.82 363,127.00 0.67 16,166.98 MWD+IFR-AK-CAZ-SC (5) 21,152.71 89.03 152.00 7,639.87 7,569.42 -11,060.62 13,837.97 5,954,586.11 363,171.09 1.36 16,262.48 MWD+IFR-AK-CAZ-SC (5) 21,245.12 89.02 151.58 7,641.45 7,571.00 -11,142.04 13,881.65 5,954,503.83 363,213.13 0.45 16,354.88 MWD+IFR-AK-CAZ-SC (5) 21,341.83 89.20 151.35 7,642.95 7,572.50 -11,226.99 13,927.84 5,954,417.98 363,257.60 0.30 16,451.57 MWD+IFR-AK-CAZ-SC (5) 21,434.86 89.09 152.02 7,644.34 7,573.89 -11,308.88 13,971.96 5,954,335.23 363,300.07 0.73 16,544.59 MWD+IFR-AK-CAZ-SC (5) 21,530.74 89.40 152.79 7,645.60 7,575.15 -11,393.85 14,016.37 5,954,249.40 363,342.77 0.87 16,640.46 MWD+IFR-AK-CAZ-SC (5) 21,626.52 89.89 152.33 7,646.19 7,575.74 -11,478.85 14,060.50 5,954,163.54 363,385.19 0.70 16,736.23 MWD+IFR-AK-CAZ-SC (5) 21,720.74 89.95 152.90 7,646.32 7,575.87 -11,562.51 14,103.84 5,954,079.03 363,426.84 0.61 16,830.44 MWD+IFR-AK-CAZ-SC (5) 21,816.41 89.89 153.44 7,646.46 7,576.01 -11,647.88 14,147.02 5,953,992.82 363,468.29 0.57 16,926.09 MWD+IFR-AK-CAZ-SC (5) 21,912.14 89.60 152.85 7,646.88 7,576.43 -11,733.29 14,190.27 5,953,906.57 363,509.82 0.69 17,021.80 MWD+IFR-AK-CAZ-SC (5) 22,006.41 89.68 153.24 7,647.48 7,577.03 -11,817.31 14,233.00 5,953,821.71 363,550.85 0.42 17,116.06 MWD+IFR-AK-CAZ-SC (5) 22,102.55 89.46 154.22 7,648.20 7,577.75 -11,903.52 14,275.55 5,953,734.67 363,591.66 1.04 17,212.15 MWD+IFR-AK-CAZ-SC (5) 22,196.50 89.94 152.85 7,648.69 7,578.24 -11,987.62 14,317.41 5,953,649.76 363,631.83 1.55 17,306.06 MWD+IFR-AK-CAZ-SC (5) 22,291.55 88.93 153.81 7,649.63 7,579.18 -12,072.55 14,360.07 5,953,563.99 363,672.78 1.47 17,401.08 MWD+IFR-AK-CAZ-SC (5) 1215/2016 10:35:53AM Page 8 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 22,387.41 87.76 153.13 7,652.40 7,581.95 -12,158.28 14,402.87 5,953,477.43 363,713.85 1.41 17,496.86 MWD+IFR-AK-CAZ-SC (5) 22,482.42 86.16 154.14 7,657.43 7,586.98 -12,243.28 14,445.01 5,953,391.61 363,754.27 1.99 17,591.70 MWD+IFR-AK-CAZ-SC (5) 22,577.92 85.72 154.23 7,664.20 7,593.75 -12,329.04 14,486.49 5,953,305.05 363,794.02 0.47 17,686.89 MWD+IFR-AK-CAZ-SC (5) 22,673.00 86.03 153.56 7,671.04 7,600.59 -12,414.20 14,528.22 5,953,219.08 363,834.03 0.77 17,781.67 MWD+IFR-AK-CAZ-SC (5) 22,769.07 86.91 151.81 7,676.95 7,606.50 -12,499.39 14,572.22 5,953,133.03 363,876.31 2.04 17,877.55 MWD+IFR-AK-CAZ-SC (5) 22,863.71 87.17 152.23 7,681.84 7,611.39 -12,582.85 14,616.56 5,953,048.69 363,918.97 0.52 17,972.06 MWD+IFR-AK-CAZ-SC (5) 22,959.78 88.02 150.53 7,685.87 7,615.42 -12,667.11 14,662.53 5,952,963.54 363,963.24 1.98 18,068.03 MWD+IFR-AK-CAZ-SC (5) 23,054.67 89.55 149.79 7,687.88 7,617.43 -12,749.40 14,709.74 5,952,880.33 364,008.78 1.79 18,162.85 MWD+IFR-AK-CAZ-SC (5) 23,150.22 90.20 148.86 7,688.09 7,617.64 -12,831.57 14,758.48 5,952,797.20 364,055.87 1.19 18,258.29 MWD+IFR-AK-CAZ-SC (5) 23,245.63 90.44 148.39 7,687.56 7,617.11 -12,913.03 14,808.15 5,952,714.77 364,103.90 0.55 18,353.54 MWD+IFR-AK-CAZ-SC (5) 23,341.14 90.43 148.62 7,686.83 7,616.38 -12,994.47 14,858.05 5,952,632.35 364,152.15 0.24 18,448.87 MWD+IFR-AK-CAZ-SC (5) 23,436.29 90.50 147.48 7,686.06 7,615.61 -13,075.20 14,908.40 5,952,550.64 364,200.87 1.20 18,543.79 MWD+IFR-AK-CAZ-SC (5) 23,531.66 90.40 148.68 7,685.31 7,614.86 -13,156.15 14,958.82 5,952,468.70 364,249.65 1.26 18,638.93 MWD+IFR-AK-CAZ-SC (5) 23,627.17 90.50 148.17 7,684.56 7,614.11 -13,237.51 15,008.83 5,952,386.36 364,298.02 0.54 18,734.25 MWD+IFR-AK-CAZ-SC (5) 23,722.45 90.61 147.18 7,683.64 7,613.19 -13,318.02 15,059.78 5,952,304.85 364,347.34 1.05 18,829.25 MWD+IFR-AK-CAZ-SC (5) 23,818.08 90.20 147.00 7,682.96 7,612.51 -13,398.30 15,111.73 5,952,223.55 364,397.67 0.47 18,924.53 MWD+IFR-AK-CAZ-SC (5) 23,912.47 89.33 146.87 7,683.35 7,612.90 -13,477.41 15,163.23 5,952,143.44 364,447.57 0.93 19,018.55 MWD+IFR-AK-CAZ-SC (5) 24,008.43 88.55 146.42 7,685.12 7,614.67 -13,557.55 15,215.98 5,952,062.26 364,498.70 0.94 19,114.07 MWD+IFR-AK-CAZ-SC (5) 24,054.81 89.52 146.63 7,685.91 7,615.46 -13,596.23 15,241.56 5,952,023.08 364,523.49 2.14 19,160.23 MWD+IFR-AK-CAZ-SC (5) 24,152.88 89.58 143.63 7,686.68 7.,616.23 -13,676.68 15,297.62 5,951,941.53 364,577.93 3.06 19,257.59 MWD+IFR-AK-CAZ-SC (6) 24,210.98 89.04 143.76 7,687.38 7,616.93 -13,723.49 15,332.02 5,951,894.03 364,611.38 0.96 19,315.07 MWD+IFR-AK-CAZ-SC (6) 24,307.25 87.77 144.22 7,690.06 7,619.61 -13,801.34 15,388.59 5,951,815.08 364,666.38 1.40 19,410.36 MWD+IFR-AK-CAZ-SC (6) 24,400.47 88.47 145.38 7,693.11 7,622.66 -13,877.47 15,442.30 5,951,737.89 364,718.54 1.45 19,502.80 MWD+IFR-AK-CAZ-SC (6) 24,495.14 89.89 145.91 7,694.47 7,624.02 -13,955.61 15,495.71 5,951,658.70 364,770.38 1.60 19,596.87 MWD+IFR-AK-CAZ-SC (6) 24,591.21 91.20 146.81 7,693.55 7,623.10 -14,035.59 15,548.93 5,951,577.68 364,821.98 1.65 19,692.47 MWD+IFR-AK-CAZ-SC (6) 24,686.38 92.09 146.46 7,690.82 7,620.37 -14,115.04 15,601.25 5,951,497.20 364,872.69 1.00 19,787.18 MWD+IFR-AK-CAZ-SC (6) 24,781.66 88.25 144.74 7,690.54 7,620.09 -14,193.64 15,655.07 5,951,417.55 364,924.92 4.42 19,881.85 MWD+IFR-AK-CAZ-SC (6) 24,876.98 89.08 147.46 7,692.76 7,622.31 -14,272.73 15,708.21 5,951,337.42 364,976.47 2.98 19,976.63 MWD+IFR-AK-CAZ-SC (6) 24,972.91 89.65 147.87 7,693.82 7,623.37 -14,353.77 15,759.52 5,951,255.36 365,026.13 0.73 20,072.28 MWD+IFR-AK-CAZ-SC (6) 25,067.52 90.11 149.19 7,694.02 7,623.57 -14,434.47 15,808.91 5,951,173.70 365,073.89 1.48 20,166.71 MWD+IFR-AK-CAZ-SC (6) 25,162.05 89.62 151.18 7,694.24 7,623.79 -14,516.48 15,855.91 5,951,090.77 365,119.24 2.17 20,261.19 MWD+IFR-AK-CAZ-SC (6) 25,258.05 88.92 153.15 7,695.47 7,625.02 -14,601.36 15,900.72 5,951,005.02 365,162.34 2.18 20,357.17 MWD+IFR-AK-CAZ-SC (6) 25,352.29 89.09 154.54 7,697.10 7,626.65 -14,685.94 15,942.26 5,950,919.63 365,202.17 1.49 20,451.35 MWD+IFR-AK-CAZ-SC (6) 25,448.78 89.85 155.27 7,698.00 7,627.55 -14,773.31 15,983.18 5,950,831.46 365,241.33 1.09 20,547.71 MWD+IFR-AK-CAZ-SC (6) 25,542.99 90.44 155.97 7,697.76 7,627.31 -14,859.12 16,022.07 5,950,744.89 365,278.49 0.97 20,641.73 MWD+IFR-AK-CAZ-SC (6) 25,639.81 90.45 155.89 7,697.01 7,626.56 -14,947.52 16,061.55 5,950,655.73 365,316.19 0.08 20,738.32 MWD+IFR-AK-CAZ-SC (6) 25,734.05 89.75 155.16 7,696.84 7,626.39 -15,033.29 16,100.60 5,950,569.20 365,353.51 1.07 20,832.38 MWD+IFR-AK-CAZ-SC (6) 25,829.81 89.26 155.35 7,697.67 7,627.22 -15,120.25 16,140.68 5,950,481.46 365,391.83 0.55 20,927.98 MWD+IFR-AK-CAZ-SC (6) 25,925.05 89.34 155.68 7,698.83 7,628.38 -15,206.92 16,180.15 5,950,394.02 365,429.56 0.36 21,023.03 MWD+IFR-AK-CAZ-SC (6) 26,020.23 89.12 156.05 7,700.11 7,629.66 -15,293.77 16,219.06 5,950,306.41 365,466.72 0.45 21,117.99 MWD+IFR-AK-CAZ-SC (6) 1215/2016 10 35 53A Page 9 COMPASS 5000 1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey MD Inc Azi TVD TVDSS +N/ -S (usft) V) V) (usft) (usft) (usft) 26,115.95 89.80 157.62 7,701.01 7,630.56 -15,381.77 26,210.73 89.50 157.48 7,701.59 7,631.14 -15,469.36 26,306.42 89.51 156.70 7,702.42 7,631.97 -15,557.50 26,401.88 89.61 156.84 7,703.15 7,632.70 -15,645.22 26,495.47 89.69 156.57 7,703.72 7,633.27 -15,731.18 26,592.93 88.99 155.83 7,704.85 7,634.40 -15,820.34 26,685.50 88.85 155.84 7,706.59 7,636.14 -15,904.79 26,781.13 88.89 155.16 7,708.48 7,638.03 -15,991.79 26,877.15 89.00 154.03 7,710.25 7,639.80 -16,078.51 26,971.81 88.54 153.04 7,712.28 7,641.83 -16,163.23 27,067.89 88.55 153.11 7,714.72 7;644.27 -16,248.86 27,070.93 88.55 153.11 7,714.79 7,644.34 -16,251.58 27,128.00 88.55 153.11 7,716.24 7,645.79 -16,302.46 16,675.71 5,949,288.86 365,903.04 0.00 22,222.99 PROJECTED to TD 12/5/2016 10:35.53AM Page 10 COMPASS 5000.1 Build 74 Map Map Vertical +E/ -W Northing Easting DLS Section (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 16,256.71 5,950,217.69 365,502.60 1.79 21,213.36 MWD+IFR-AK-CAZ-SC (6) 16,292.91 5,950,129.39 365,537.03 0.35 21,307.69 MWD+IFR-AK-CAZ-SC (6) 16,330.16 5,950,040.53 365,572.50 0.82 21,403.00 MWD+IFR-AK-CAZ-SC (6) 16,367.81 5,949,952.08 365,608.38 0.18 21,498.13 MWD+IFR-AK-CAZ-SC (6) 16,404.82 5,949,865.41 365,643.66 0.30 21,591.40 MWD+IFR-AK-CAZ-SC (6) 16,444.14 5,949,775.48 365,681.19 1.05 21,688.59 MWD+IFR-AK-CAZ-SC (6) 16,482.03 5,949,690.30 365,717.38 0.15 21,780.94 MWD+IFR-AK-CAZ-SC (6) 16,521.68 5,949,602.53 365,755.27 0.71 21,876.37 MWD+IFR-AK-CAZ-SC (6) 16,562.87 5,949,515.01 365,794.71 1.18 21,972.28 MWD+IFR-AK-CAZ-SC (6) 16,605.04 5,949,429.47 365,835.17 1.15 22,066.88 MWD+IFR-AK-CAZ-SC (6) 16,648.54 5,949,342.98 365,876.94 0.07 22,162.91 MWD+IFR-AK-CAZ-SC (6) 16,649.91 5,949,340.24 365,878.26 0.00 22,165.95unT anh�nl gnm"l 27,128.00 88.55 153.11 7,716.24 7,645.79 -16,302.46 16,675.71 5,949,288.86 365,903.04 0.00 22,222.99 PROJECTED to TD 12/5/2016 10:35.53AM Page 10 COMPASS 5000.1 Build 74 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. ❑ Yes ❑ No I have checked to the best of my ability that the following data is correct. Surface Coordinates Declination & Convergence GRS Survey Corrections Digitally signed by 0 Survey Tool Codes Brij Hall-Potnis Date: 2016.12.02 SLB DE: 21:50:10 -09'00' david.l.lee@con G9,twYIig—Y d.Id I le^.$conxopNlllpxcom Client Representative: ocophillips.com Date: 21 61 22 !RECEIVED 27 79 8 DEC 08 2016 J ConocoPhill ips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CD5-99A CD5-99A NAD 83 Definitive Survey Report 02 December, 2016 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-99 Wellbore: CD5-99A Design: CD5-99A SLB Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Well CD5-99 Well Position +N/ -S +E/ -W Position Uncertainty �llbore CD5-99A Magnetics Model Name Design Audit Notes: Version: Vertical Section: 0.00 usft Northing: 5,965,666.90 usft Latitude: 70° 18'49.211 N 0.00 usft Easting: 1,489,591.67 usft Longitude: 151° 13'20.821 W 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft BGGM2016 CD5-99A Sample Date Declination Dip Angle Field Strength 10/1/2016 17.52 80.81 57,510 1.0 Phase: ACTUAL Tie On Depth: 2,270.51 Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 36.55 0.00 0.00 152.00 Survey Program Date 12/2/2016 From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 100.00 500.00 CD5-99 Svy1 - SLB_NSG-SSHOT (CD5- GYD-GC-SS Gyrodata gyro single shots 8/28/2016 11:46: 572.96 2,270.51 CD5-99 Svy2 - SLB_MWD_GMAG (CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/28/2016 11:55: 2,354.63 2,354.63 CD5-99A Svy1 - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer + known azi trend 10/1/2016 11:11: 2,400.38 15,515.86 CD5-99A Svy2 - SLB _MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/1/2016 11:23: 15,596.06 24,054.81 CD5-99A Svy3 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/15/2016 2:37 24,115.15 27,067.89 CD5-99A Svy4 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/25/2016 9:55 ISurvey 1212/2016 9.46:10PM Page 2 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.90 0.00 0.00 5,965,666.90 1,489,591.67 0.00 0.00 UNDEFINED 100.00 0.35 80.47 100.00 29.55 0.03 0.19 5,965,666.93 1,489,591.86 0.55 0.06 GYD-GC-SS(1) 200.00 0.30 136.60 200.00 129.55 -0.11 0.67 5,965,666.78 1,489,592.34 0.31 0.41 GYD-GC-SS(1) 300.00 0.42 180.43 300.00 229.55 -0.66 0.85 5,965,666.22 1,489,592.51 0.29 0.99 GYD-GC-SS (1) 400.00 1.46 178.92 399.98 329.53 -2.30 0.87 5,965,664.58 1,489,592.49 1.04 2.44 GYD-GC-SS (1) 500.00 2.50 174.40 499.92 429.47 -5.75 1.11 5,965,661.13 1,489,592.66 1.05 5.60 GYD-GC-SS (1) 572.96 2.84 173.07 572.80 502.35 -9.13 1.48 5,965,657.75 1,489,592.97 0.47 8.75 MWD+IFR-AK-CAZ-SC (2) 659.55 3.53 165.66 659.26 588.81 -13.84 2.40 5,965,653.02 1,489,593.79 0.93 13.35 MWD+IFR-AK-CAZ-SC (2) 751.03 4.95 165.13 750.48 680.03 -20.38 4.11 5,965,646.44 1,489,595.37 1.55 19.93 MWD+IFR-AK-CAZ-SC (2) 845.81 7.79 162.16 844.67 774.22 -30.45 7.13 5,965,636.31 1,489,598.18 3.02 30.23 MWD+IFR-AK-CAZ-SC (2) 1212/2016 9.46:10PM Page 2 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting US Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 940.37 11.22 158.66 937.92 867.47 -45.12 12.44 5,965,621.54 1,489,603.20 3.68 45.68 MWD+IFR-AK-CAZ-SC (2) 1,034.58 13.28 155.03 1,029.98 959.53 -63.47 20.34 5,965,603.04 1,489,610.73 2.33 65.60 MWD+IFR-AK-CAZ-SC (2) 1,129.57 14.30 153.79 1,122.23 1,051.78 -83.89 30.13 5,965,582.43 1,489,620.11 1.12 88.22 MWD+IFR-AK-CAZ-SC (2) 1,222.50 14.94 150.97 1,212.15 1,141.70 -104.66 41.01 5,965,561.44 1,489,630.57 1.03 111.66 MWD+IFR-AK-CAZ-SC (2) 1,317.05 15.53 150.01 1,303.38 1,232.93 -126.28 53.26 5,965,539.58 1,489,642.37 0.68 136.50 MWD+IFR-AK-CAZ-SC (2) 1,410.15 17.57 146.48 1,392.62 1,322.17 -148.79 67.25 5,965,516.80 1,489,655.91 2.44 162.95 MWD+IFR-AK-CAZ-SC (2) 1,506.38 21.17 141.10 1,483.40 1,412.95 -174.44 86.19 5,965,490.78 1,489,674.33 4.17 194.48 MWD+IFR-AK-CAZ-SC (2) 1,600.00 23.81 137.20 1,569.89 1,499.44 -201.46 109.65 5,965,463.29 1,489,697.24 3.24 229.36 MWD+IFR-AK-CAZ-SC (2) 1,694.62 26.66 133.78 1,655.48 1,585.03 -230.17 137.96 5,965,434.02 1,489,724.97 3.38 268.00 MWD+IFR-AK-CAZ-SC (2) 1,788.88 29.81 132.16 1,738.51 1,668.06 -260.54 170.60 5,965,403.01 1,489,756.99 3.44 310.13 MWD+IFR-AK-CAZ-SC (2) 1,882.95 32.44 130.76 1,819.04 1,748.59 -292.71 207.05 5,965,370.11 1,489,792.79 2.90 355.65 MWD+IFR-AK-CAZ-SC (2) 1,976.79 33.94 130.25 1,897.56 1,827.11 -326.07 246.11 5,965,335.98 1,489,831.17 1.63 403.45 MWD+IFR-AK-CAZ-SC (2) 2,070.83 35.82 129.12 1,974.71 1,904.26 -360.40 287.50 5,965,300.83 1,489,871.86 2.11 453.19 MWD+IFR-AK-CAZ-SC (2) 2,165.49 37.79 127.90 2,050.50 1,980.05 -395.70 331.88 5,965,264.65 1,489,915.51 2.22 505.19 MWD+IFR-AK-CAZ-SC (2) 2,259.49 40.14 127.23 2,123.58 2,053.13 -431.72 378.74 5,965,227.69 1,489,961.63 2.54 559.00 MWD+IFR-AK-CAZ-SC (2) 2,270.51 40.86 126.48 2,131.96 2,061.51 -436.02 384.47 5,965,223.28 1,489,967.27 7.89 565.48 MWD+IFR-AK-CAZ-SC (2) Tie On - 10-3/4" x 13-1/2" 2,354.63 39.48 125.36 2,196.24 2,125.79 -467.85 428.40 5,965,190.57 1,490,010.56 1.85 614.21 INC+TREND (3) 2,400.38 38.27 124.71 2,231.85 2,161.40 -484.34 451.91 5,965,173.62 1,490,033.73 2.79 639.81 MWD+IFR-AK-CAZ-SC (4) 2,449.55 39.97 124.54 2,270.00 2,199.55 -501.97 477.44 5,965,155.48 1,490,058.90 3.46 667.35 MWD+IFR-AK-CAZ-SC (4) 2,496.41 42.85 122.76 2,305.14 2,234.69 -519.13 503.25 5,965,137.81 1,490,084.35 6.64 694.62 MWD+IFR-AK-CAZ-SC (4) 2,543.50 45.60 122.60 2,338.88 2,268.43 -536.86 530.89 5,965,119.53 1,490,111.63 5.84 723.25 MWD+IFR-AK-CAZ-SC (4) 2,590.10 47.02 122.20 2,371.07 2,300.62 -554.91 559.34 5,965,100.91 1,490,139.71 3.11 752.55 MWD+IFR-AK-CAZ-SC (4) 2,638.47 48.78 121.65 2,403.50 2,333.05 -573.89 589.80 5,965,081.33 1,490,169.78 3.74 783.61 MWD+IFR-AK-CAZ-SC (4) 2,685.65 50.29 121.67 2,434.12 2,363.67 -592.73 620.35 5,965,061.88 1,490,199.94 3.20 814.58 MWD+IFR-AK-CAZ-SC (4) 2,733.47 52.01 121.23 2,464:11 2,393.66 -612.15 652.12 5,965,041.82 1,490,231.32 3.67 846.65 MWD+IFR-AK-CAZ-SC (4) 2,781.44 53.64 120.35 2,493.10 2,422.65 -631.72 684.96 5,965,021.60 1,490,263.75 3.70 879.34 MWD+IFR-AK-CAZ-SC (4) 2,827.79 55.19 120.21 2,520.07 2,449.62 -650.72 717.51 5,965,001.95 1,490,295.91 3.35 911.40 MWD+IFR-AK-CAZ-SC (4) 2,873.78 56.60 120.81 2,545.86 2,475.41 -670.06 750.31 5,964,981.96 1,490,328.32 3.25 943.88 MWD+IFR-AK-CAZ-SC (4) 2,921.08 57.79 121.21 2,571.48 2,501.03 -690.54 784.39 5,964,960.80 1,490,361.97 2.61 977.96 MWD+IFR-AK-CAZ-SC (4) 3,016.32 59.97 123.67 2,620.71 2,550.26 -734.28 853.17 5,964,915.68 1,490,429.86 3.18 1,048.87 MWD+IFR-AK-CAZ-SC (4) 3,061.84 61.29 123.58 2,643.03 2,572.58 -756.25 886.21 5,964,893.06 1,490,462.44 2.90 1,083.78 MWD+IFR-AK-CAZ-SC (4) 3,111.30 62.67 123.84 2,666.27 2,595.82 -780.48 922.53 5,964,868.10 1,490,498.26 2.83 1,122.22 MWD+IFR-AK-CAZ-SC (4) 3,157.34 64.23 123.66 2,686.85 2,616.40 -803.36 956.77 5,964,844.54 1,490,532.04 3.41 1,158.50 MWD+IFR-AK-CAZ-SC (4) 3,203.86 65.52 123.31 2,706.60 2,636.15 -826.60 991.90 5,964,820.61 1,490,566.69 2.86 1,195.51 MWD+IFR-AK-CAZ-SC (4) 3,299.05 65.99 123.09 2,745.69 2,675.24 -874.12 1,064.52 5,964,771.64 1,490,638.34 0.54 1,271.57 MWD+IFR-AK-CAZ-SC (4) 3,392.96 66.08 122.52 2,783.83 2,713.38 -920.62 1,136.65 5,964,723.71 1,490,709.51 0.56 1,346.48 MWD+IFR-AK-CAZ-SC (4) 3,487.44 65.97 122.70 2,822.22 2,751.77 -967.14 1,209.37 5,964,675.74 1,490,781.28 0.21 1,421.70 MWD+IFR-AK-CAZ-SC (4) 3,583.78 66.02 122.64 2,861.42 2,790.97 -1,014.65 1,283.45 5,964,626.75 1,490,854.39 0.08 1,498.42 MWD+IFR-AK-CAZ-SC (4) 3,677.93 66.02 121.78 2,899.68 2,829.23 -1,060.50 1,356.24 5,964,579.45 1,490,926.23 0.83 1,573.08 MWD+IFR-AK-CAZ-SC (4) 12/212016 9.46:10PM Page 3 COMPASS 5000.1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-99 Wellbore: CD5-99A Design: CD5-99A Survey SLB Definitive Survey Report Local Co-ordinate Reference: Well CD5-99 TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM Production Vertical Section (ft) Survey Tool Name 1,646.39 MWD+IFR-AK-CAZ-SC (4) 1,720.46 MWD+IFR-AK-CAZ-SC (4) 1,793.05 MWD+IFR-AK-CAZ-SC (4) 1,866.34 MWD+IFR-AK-CAZ-SC (4) 1,938.40 MWD+IFR-AK-CAZ-SC (4) 2,011.76 MWD+IFR-AK-CAZ-SC (4) 2,083.80 MWD+IFR-AK-CAZ-SC (4) 2,155.32 MWD+IFR-AK-CAZ-SC (4) 2,228.66 MWD+IFR-AK-CAZ-SC (4) 2,300.78 MWD+IFR-AK-CAZ-SC (4) 2,372.95 MWD+IFR-AK-CAZ-SC (4) 2,445.55 MWD+IFR-AK-CAZ-SC (4) 2,517.26 MWD+IFR-AK-CAZ-SC (4) 2,588.32 MWD+IFR-AK-CAZ-SC (4) 2,660.07 MWD+IFR-AK-CAZ-SC (4) 2,732.37 MWD+IFR-AK-CAZ-SC (4) 2,802.72 MWD+IFR-AK-CAZ-SC (4) 2,875.37 MWD+IFR-AK-CAZ-SC (4) 2,946.98 MWD+IFR-AK-CAZ-SC (4) 3,017.62 MWD+IFR-AK-CAZ-SC (4) 3,088.73 MWD+IFR-AK-CAZ-SC (4) 3,160.94 MWD+IFR-AK-CAZ-SC (4) 3,231.73 MWD+IFR-AK-CAZ-SC (4) 3,301.73 MWD+IFR-AK-CAZ-SC (4) 3,371.90 MWD+IFR-AK-CAZ-SC (4) 3,441.87 MWD+IFR-AK-CAZ-SC (4) 3,512.25 MWD+IFR-AK-CAZ-SC (4) 3,583.99 MWD+IFR-AK-CAZ-SC (4) 3,655.89 MWD+IFR-AK-CAZ-SC (4) 3,727.83 MWD+IFR-AK-CAZ-SC (4) 3,799.14 MWD+IFR-AK-CAZ-SC (4) 3,870.82 MWD+IFR-AK-CAZ-SC (4) 3,941.99 MWD+IFR-AK-CAZ-SC (4) 4,012.90 MWD+IFR-AK-CAZ-SC (4) 4,084.19 MWD+IFR-AK-CAZ-SC (4) 4,156.42 MWD+IFR-AK-CAZ-SC (4) 4,229.63 MWD+IFR-AK-CAZ-SC (4) 4,300.44 MWD+IFR-AK-CAZ-SC (4) 4,373.10 MWD+IFR-AK-CAZ-SC (4) 4,446.01 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 9: 46.1OPM Page 4 COMPASS 5000.1 Build 74 Map Map MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') 3,770.86 66.02 121.62 2,937.45 2,867.00 -1,105.12 1,428.48 5,964,533.40 1,490,997.56 0.16 3,865.49 66.11 120.21 2,975.84 2,905.39 -1,149.55 1,502.68 5,964,487.48 1,491,070.85 1.37 3,959.41 66.09 119.23 3,013.89 2,943.44 -1,192.12 1,577.25 5,964,443.43 1,491,144.54 0.95 4,054.40 66.09 119.90 3,052.39 2,981.94 -1,234.97 1,652.78 5,964,399.08 1,491,219.19 0.64 4,147.49 66.12 119.78 3,090.10 3,019.65 -1,277.32 1,726.61 5,964,355.26 1,491,292.15 0.12 4,242.73 65.49 119.45 3,129.13 3,058.68 -1,320.25 1,802.13 5,964,310.82 1,491,366.79 0.73 4,337.15 65.55 118.48 3,168.26 3,097.81 -1,361.86 1,877.32 5,964,267.71 1,491,441.11 0.94 4,430.83 65.43 119.60 3,207.12 3,136.67 -1,403.23 1,951.84 5,964,224.85 1,491,514.78 1.10 4,526.10 65.57 119.96 3,246.63 3,176.18 -1,446.29 2,027.08 5,964,180.29 1,491,589.14 0.37 4,619.67 65.37 119.87 3,285.48 3,215.03 -1,488.75 2,100.86 5,964,136.37 1,491,662.05 0.23 4,714.13 65.56 118.38 3,324.71 3,254.26 -1,530.57 2,175.93 5,964,093.05 1,491,736.25 1.45 4,809.66 65.41 118.91 3,364.34 3,293.89 -1,572.23 2,252.21 5,964,049.86 1,491,811.67 0.53 4,903.76 65.46 118.93 3,403.46 3,333.01 -1,613.62 2,327.12 5,964,006.98 1,491,885.73 0.06 4,997.13 65.61 118.54 3,442.13 3,371.68 -1,654.48 2,401.64 5,963,964.64 1,491,959.41 0.41 5,091.58 65.85 118.35 3,480.95 3,410.50 -1,695.49 2,477.35 5,963,922.12 1,492,034.28 0.31 5,186.76 65.98 118.27 3,519.80 3,449.35 -1,736.70 2,553.85 5,963,879.38 1,492,109.93 0.16 5,279.36 65.94 118.31 3,557.52 3,487.07 -1,776.78 2,628.31 5,963,837.82 1,492,183.57 0.06 5,375.09 65.80 118.22 3,596.65 3,526.20 -1,818.15 2,705.26 5,963,794.91 1,492,259.67 0.17 5,469.64 65.82 118.03 3,635.40 3,564.95 -1,858.81 2,781.33 5,963,752.74 1,492,334.89 0.18 5,562.68 65.72 118.69 3,673.58 3,603.13 -1,899.11 2,855.99 5,963,710.95 1,492,408.72 0.66 5,656.11 65.52 118.69 3,712.15 3,641.70 -1,939.96 2,930.64 5,963,668.61 1,492,482.53 0.21 5,751..20 65.37 118.51 3,751.66 3,681.21 -1,981.36 3,006.57 5,963,625.69 1,492,557.62 0.23 5,845.38 65.39 117.03 3,790.90 3,720.45 -2,021.25 3,082.33 5,963,584.29 1,492,632.55 1.43 5,939.38 65.59 116.84 3,829.90 3,759.45 -2,060.00 3,158.58 5,963,544.03 1,492,708.00 0.28 6,033.53 65.51 117.08 3,868.87 3,798.42 -2,098.85 3,234.97 5,963,503.65 1,492,783.59 0.25 6,127.05 65.97 117.21 3,907.29 3,836.84 -2,137.75 3,310.84 5,963,463.23 1,492,858.66 0.51 6,220.59 66.04 117.69 3,945.33 3,874.88 -2,177.15 3,386.68 5,963,422.33 1,492,933.68 0.47 6,315.27 65.97 118.38 3,983.83 3,913.38 -2,217.80 3,463.02 5,963,380.15 1,493,009.19 0.67 6,409.67 66.13 118.52 4,022.15 3,951.70 -2,258.90 3,538.88 5,963,337.54 1,493,084.20 0.22 6,503.79 66.01 118.96 4,060.33 3,989.88 -2,300.27 3,614.31 5,963,294.67 1,493,158.78 0.45 6,597.09 65.42 119.01 4,098.70 4,028.25 -2,341.48 3,688.70 5,963,251.98 1,493,232.32 0.63 6,691.36 65.60 118.33 4,137.78 4,067.33 -2,382.63 3,763.97 5,963,209.32 1,493,306.74 0.68 6,785.93 65.05 117.50 4,177.26 4,106.81 -2,422.87 3,839.91 5,963,167.57 1,493,381.85 0.99 6,880.32 64.95 118.47 4,217.15 4,146.70 -2,463.01 3,915.45 5,963,125.92 1,493,456.56 0.94 6,974.08 65.54 119.25 4,256.42 4,185.97 -2,504.10 3,990.02 5,963,083.34 1,493,530.29 0.98 7,068.23 65.52 119.63 4,295.41 4,224.96 -2,546.22 4,064.64 5,963,039.73 1,493,604.05 0.37 7,163.21 65.53 120.14 4,334.76 4,264.31 -2,589.30 4,139.59 5,962,995.17 1,493,678.11 0.49 7,254.95 65.55 119.82 4,372.75 4,302.30 -2,631.02 4,211.93 5,962,952.00 1,493,749.59 0.32 7,349.11 65.49 120.15 4,411.77 4,341.32 -2,673.85 4,286.15 5,962,907.69 1,493,822.93 0.33 7,443.24 65.53 120.53 4,450.79 4,380.34 -2,717.12 4,360.08 5,962,862.95 1,493,895.97 0.37 Vertical Section (ft) Survey Tool Name 1,646.39 MWD+IFR-AK-CAZ-SC (4) 1,720.46 MWD+IFR-AK-CAZ-SC (4) 1,793.05 MWD+IFR-AK-CAZ-SC (4) 1,866.34 MWD+IFR-AK-CAZ-SC (4) 1,938.40 MWD+IFR-AK-CAZ-SC (4) 2,011.76 MWD+IFR-AK-CAZ-SC (4) 2,083.80 MWD+IFR-AK-CAZ-SC (4) 2,155.32 MWD+IFR-AK-CAZ-SC (4) 2,228.66 MWD+IFR-AK-CAZ-SC (4) 2,300.78 MWD+IFR-AK-CAZ-SC (4) 2,372.95 MWD+IFR-AK-CAZ-SC (4) 2,445.55 MWD+IFR-AK-CAZ-SC (4) 2,517.26 MWD+IFR-AK-CAZ-SC (4) 2,588.32 MWD+IFR-AK-CAZ-SC (4) 2,660.07 MWD+IFR-AK-CAZ-SC (4) 2,732.37 MWD+IFR-AK-CAZ-SC (4) 2,802.72 MWD+IFR-AK-CAZ-SC (4) 2,875.37 MWD+IFR-AK-CAZ-SC (4) 2,946.98 MWD+IFR-AK-CAZ-SC (4) 3,017.62 MWD+IFR-AK-CAZ-SC (4) 3,088.73 MWD+IFR-AK-CAZ-SC (4) 3,160.94 MWD+IFR-AK-CAZ-SC (4) 3,231.73 MWD+IFR-AK-CAZ-SC (4) 3,301.73 MWD+IFR-AK-CAZ-SC (4) 3,371.90 MWD+IFR-AK-CAZ-SC (4) 3,441.87 MWD+IFR-AK-CAZ-SC (4) 3,512.25 MWD+IFR-AK-CAZ-SC (4) 3,583.99 MWD+IFR-AK-CAZ-SC (4) 3,655.89 MWD+IFR-AK-CAZ-SC (4) 3,727.83 MWD+IFR-AK-CAZ-SC (4) 3,799.14 MWD+IFR-AK-CAZ-SC (4) 3,870.82 MWD+IFR-AK-CAZ-SC (4) 3,941.99 MWD+IFR-AK-CAZ-SC (4) 4,012.90 MWD+IFR-AK-CAZ-SC (4) 4,084.19 MWD+IFR-AK-CAZ-SC (4) 4,156.42 MWD+IFR-AK-CAZ-SC (4) 4,229.63 MWD+IFR-AK-CAZ-SC (4) 4,300.44 MWD+IFR-AK-CAZ-SC (4) 4,373.10 MWD+IFR-AK-CAZ-SC (4) 4,446.01 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 9: 46.1OPM Page 4 COMPASS 5000.1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-99 Wellbore: CD5-99A Design: CD5-99A Survey r SLB Definitive Survey Report Local Co-ordinate Reference: Well CD5-99 TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM Production Vertical Section (ft) Survey Tool Name 4,519.74 MWD+IFR-AK-CAZ-SC (4) 4,593.07 MWD+IFR-AK-CAZ-SC (4) 4,665.56 MWD+IFR-AK-CAZ-SC (4) 4,739.85 MWD+IFR-AK-CAZ-SC (4) 4,813.69 MWD+IFR-AK-CAZ-SC (4) 4,885.80 MWD+IFR-AK-CAZ-SC (4) 4,958.83 MWD+IFR-AK-CAZ-SC (4) 5,029.84 MWD+IFR-AK-CAZ-SC (4) 5,103.04 MWD+IFR-AK-CAZ-SC (4) 5,174.85 MWD+IFR-AK-CAZ-SC (4) 5,246.18 MWD+IFR-AK-CAZ-SC (4) 5,316.98 MWD+IFR-AK-CAZ-SC (4) 5,386.81 MWD+IFR-AK-CAZ-SC (4) 5,458.21 MWD+IFR-AK-CAZ-SC (4) 5,528.98 MWD+IFR-AK-CAZ-SC (4) 5,598.83 MWD+IFR-AK-CAZ-SC (4) 5,670.33 MWD+IFR-AK-CAZ-SC (4) 5,742.32 MWD+IFR-AK-CAZ-SC (4) 5,815.62 MWD+IFR-AK-CAZ-SC (4) 5,887.83 MWD+IFR-AK-CAZ-SC (4) 5,958.91 MWD+IFR-AK-CAZ-SC (4) 6,030.19 MWD+IFR-AK-CAZ-SC (4) 6,098.60 MWD+IFR-AK-CAZ-SC (4) 6,170.21 MWD+IFR-AK-CAZ-SC (4) 6,240.02 MWD+IFR-AK-CAZ-SC (4) 6,312.50 MWD+IFR-AK-CAZ-SC (4) 6,385.41 MWD+IFR-AK-CAZ-SC (4) 6,459.21 MWD+IFR-AK-CAZ-SC (4) 6,533.05 MWD+IFR-AK-CAZ-SC (4) 6,609.15 MWD+IFR-AK-CAZ-SC (4) 6,685.01 MWD+IFR-AK-CAZ-SC (4) 6,759.46 MWD+IFR-AK-CAZ-SC (4) 6,834.08 MWD+IFR-AK-CAZ-SC (4) 6,908.77 MWD+IFR-AK-CAZ-SC (4) 6,982.82 MWD+IFR-AK-CAZ-SC (4) 7,056.43 MWD+IFR-AK-CAZ-SC (4) 7,129.99 MWD+IFR-AK-CAZ-SC (4) 7,203.02 MWD+IFR-AK-CAZ-SC (4) 7,274.18 MWD+IFR-AK-CAZ-SC (4) 7,345.62 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 9:46:10PM Page 5 COMPASS 5000.1 Build 74 Map Map MD Inc Azi ND TVDSS +N/ -S +E/ -W Northing Easting DLS (usft) (1) V) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') 7,537.81 65.62 121.26 4,489.89 4,419.44 -2,761.33 4,433.97 5,962,817.26 1,493,968.95 0.71 7,631.19 65.55 121.92 4,528.49 4,458.04 -2,805.88 4,506.40 5,962,771.28 1,494,040.46 0.65 7,723.34 65.59 121.62 4,566.60 4,496.15 -2,850.05 4,577.73 5,962,725.69 1,494,110.89 0.30 7,818.15 65.53 121.19 4,605.83 4,535.38 -2,895.03 4,651.40 5,962,679.24 1,494,183.63 0.42 7,913.03 65.50 120.34 4,645.15 4,574.70 -2,939.19 4,725.59 5,962,633.60 1,494,256.92 0.82 8,006.35 65.49 119.93 4,683.86 4,613.41 -2,981.82 4,799.03 5,962,589.50 1,494,329.48 0.40 8,101.59 65.59 118.86 4,723.30 4,652.85 -3,024.37 4,874.56 5,962,545.45 1,494,404.13 1.03 8,194.58 65.58 119.13 4,761.73 4,691.28 -3,065.42 4,948.62 5,962,502.93 1,494,477.35 0.26 8,290.23 65.53 119.28 4,801.31 4,730.86 -3,107.91 5,024.63 5,962,458.92 1,494,552.48 0.15 8,384.19 65.40 119.02 4,840.33 4,769.88 -3,149.54 5,099.28 5,962,415.80 1,494,626.28 0.29 8,477.96 65.40 118.57 4,879.37 4,808.92 -3,190.61 5,173.99 5,962,373.24 1,494,700.15 0.44 8,571.84 65.43 117.50 4,918.43 4,847.98 -3,230.73 5,249.34 5,962,331.62 1,494,774.67 1.04 8,665.25 65.65 116.91 4,957.10 4,886.65 -3,269.60 5,324.96 5,962,291.24 1,494,849.49 0.62 8,760.88 65.94 116.99 4,996.31 4,925.86 -3,309.13 5,402.71 5,962,250.16 1,494,926.42 0.31 8,855.16 66.00 117.54 5,034.70 4,964.25 -3,348.58 5,479.26 5,962,209.18 1,495,002.15 0.54 8,947.50 66.06 118.23 5,072.22 5,001.77 -3,388.04 5,553.83 5,962,168.23 1,495,075.92 0.69 9,041.26 66.16 118.79 5,110.19 5,039.74 -3,428.96 5,629.17 5,962,125.81 1,495,150.41 0.56 9,135.01 66.13 119.41 5,148.10 5,077.65 -3,470.66 5,704.08 5,962,082.62 1,495,224.47 0.61 9,230.32 66.03 119.16 5,186.75 5,116.30 -3,513.28 5,780.07 5,962,038.49 1,495,299.58 0.26 9,324.30 66.13 119.24 5,224.85 5,154.40 -3,555.19 5,855.06 5,961,995.08 1,495,373.71 0.13 9,417.28 66.00 118.27 5,262.58 5,192.13 -3,596.07 5,929.57 5,961,952.72 1,495,447.37 0.96 9,512.16 65.56 116.68 5,301.50 5,231.05 -3,635.99 6,006.33 5,961,911.26 1,495,523.31 1.60 9,604.38 65.43 116.53 5,339.75 5,269.30 -3,673.57 6,081.36 5,961,872.19 1,495,597.56 0.20 9,700.78 65.87 116.73 5,379.50 5,309.05 -3,712.94 6,159.87 5,961,831.26 1,495,675.26 0.49 9,793.87 65.46 118.06 5,417.86 5,347.41 -3,751.96 6,235.17 5,961,790.73 1,495,749.76 1.37 9,888.80 65.62 119.96 5,457.17 5,386.72 -3,793.87 6,310.74 5,961,747.32 1,495,824.46 1.83 9,982.62 66.04 120.86 5,495.58 5,425.13 -3,837.19 6,384.55 5,961,702.52 1,495,897.39 0.98 10,076.49 66.01 121.88 5,533.73 5,463.28 -3,881.84 6,457.79 5,961,656.41 1,495,969.70 0.99 10,169.41 66.16 122.87 5,571.40 5,500.95 -3,927.32 6,529.52 5,961,609.50 1,496,040.51 0.99 10,264.29 66.04 123.77 5,609.84 5,539.39 -3,974.97 6,602.01 5,961,560.41 1,496,112.01 0.88 10,358.35 66.03 124.16 5,648.04 5,577.59 -4,022.99 6,673.29 5,961,510.97 1,496,182.32 0.38 10,451.09 65.99 122.80 5,685.75 5,615.30 -4,069.73 6,743.96 5,961,462.83 1,496,252.02 1.34 10,544.91 65.53 122.64 5,724.27 5,653.82 -4,115.97 6,815.94 5,961,415.15 1,496,323.05 0.51 10,639.55 65.46 121.68 5,763.52 5,693.07 -4,161.81 6,888.84 5,961,367.86 1,496,395.01 0.93 10,734.25 65.31 120.97 5,802.97 5,732.52 -4,206.57 6,962.38 5,961,321.64 1,496,467.63 0.70 10,828.68 65.51 121.04 5,842.26 5,771.81 -4,250.80 7,035.98 5,961,275.94 1,496,540.32 0.22 10,923.35 65.44 120.29 5,881.56 5,811.11 -4,294.73 7,110.06 5,961,230.54 1,496,613.50 0.72 11,018.15 65.38 119.51 5,921.01 5,850.56 -4,337.70 7,184.79 5,961,186.08 1,496,687.35 0.75 11,111.02 65.37 119.39 5,959.71 5,889.26 -4,379.21 7,258.31 5,961,143.11 1,496,760.01 0.12 11,204.74 65.57 118.45 5,998.62 5,928.17 -4,420.44 7,332.93 5,961,100.39 1,496,833.79 0.94 Vertical Section (ft) Survey Tool Name 4,519.74 MWD+IFR-AK-CAZ-SC (4) 4,593.07 MWD+IFR-AK-CAZ-SC (4) 4,665.56 MWD+IFR-AK-CAZ-SC (4) 4,739.85 MWD+IFR-AK-CAZ-SC (4) 4,813.69 MWD+IFR-AK-CAZ-SC (4) 4,885.80 MWD+IFR-AK-CAZ-SC (4) 4,958.83 MWD+IFR-AK-CAZ-SC (4) 5,029.84 MWD+IFR-AK-CAZ-SC (4) 5,103.04 MWD+IFR-AK-CAZ-SC (4) 5,174.85 MWD+IFR-AK-CAZ-SC (4) 5,246.18 MWD+IFR-AK-CAZ-SC (4) 5,316.98 MWD+IFR-AK-CAZ-SC (4) 5,386.81 MWD+IFR-AK-CAZ-SC (4) 5,458.21 MWD+IFR-AK-CAZ-SC (4) 5,528.98 MWD+IFR-AK-CAZ-SC (4) 5,598.83 MWD+IFR-AK-CAZ-SC (4) 5,670.33 MWD+IFR-AK-CAZ-SC (4) 5,742.32 MWD+IFR-AK-CAZ-SC (4) 5,815.62 MWD+IFR-AK-CAZ-SC (4) 5,887.83 MWD+IFR-AK-CAZ-SC (4) 5,958.91 MWD+IFR-AK-CAZ-SC (4) 6,030.19 MWD+IFR-AK-CAZ-SC (4) 6,098.60 MWD+IFR-AK-CAZ-SC (4) 6,170.21 MWD+IFR-AK-CAZ-SC (4) 6,240.02 MWD+IFR-AK-CAZ-SC (4) 6,312.50 MWD+IFR-AK-CAZ-SC (4) 6,385.41 MWD+IFR-AK-CAZ-SC (4) 6,459.21 MWD+IFR-AK-CAZ-SC (4) 6,533.05 MWD+IFR-AK-CAZ-SC (4) 6,609.15 MWD+IFR-AK-CAZ-SC (4) 6,685.01 MWD+IFR-AK-CAZ-SC (4) 6,759.46 MWD+IFR-AK-CAZ-SC (4) 6,834.08 MWD+IFR-AK-CAZ-SC (4) 6,908.77 MWD+IFR-AK-CAZ-SC (4) 6,982.82 MWD+IFR-AK-CAZ-SC (4) 7,056.43 MWD+IFR-AK-CAZ-SC (4) 7,129.99 MWD+IFR-AK-CAZ-SC (4) 7,203.02 MWD+IFR-AK-CAZ-SC (4) 7,274.18 MWD+IFR-AK-CAZ-SC (4) 7,345.62 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 9:46:10PM Page 5 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: CD5-99 North Reference: Wellbore: CD5-99A Survey Calculation Method: Design: CD5-99A Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production Survey Map Map Vertical MD Inc Azi ND TVDSS +Nl-S +El -W Northing Easting DLS Section (usft) (°) (') (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,298.23 65.56 117.64 6,037.29 5,966.84 -4,460.46 7,408.05 5,961,058.87 1,496,908.08 0.79 7,416.22 MWD+IFR-AK-CAZ-SC (4) 11,392.12 65.57 117.93 6,076.13 6,005.68 -4,500.30 7,483.68 5,961,017.52 1,496,982.89 0.28 7,486.91 MWD+IFR-AK-CAZ-SC (4) 11,484.54 65.30 118.06 6,114.55 6,044.10 -4,539.76 7,557.90 5,960,976.58 1,497,056.29 0.32 7,556.59 MWD+IFR-AK-CAZ-SC (4) 11,577.92 65.64 117.98 6,153.32 6,082.87 -4,579.67 7,632.89 5,960,935.18 1,497,130.47 0.37 7,627.03 MWD+IFR-AK-CAZ-SC (4) 11,673.36 65.52 117.73 6,192.78 6,122.33 -4,620.27 7,709.73 5,960,893.04 1,497,206.46 0.27 7,698.95 MWD+IFR-AK-CAZ-SC (4) 11,765.10 65.57 118.48 6,230.75 6,160.30 -4,659.61 7,783.39 5,960,852.23 1,497,279.31 0.75 7,768.27 MWD+IFR-AK-CAZ-SC (4) 11,860.16 65.60 119.08 6,270.05 6,199.60 -4,701.28 7,859.25 5,960,809.05 1,497,354.32 0.58 7,840.68 MWD+IFR-AK-CAZ-SC (4) 11,952.38 65.50 118.87 6,308.22 6,237.77 -4,741.95 7,932.70 5,960,766.92 1,497,426.93 0.23 7,911.07 MWD+IFR-AK-CAZ-SC (4) 12,046.87 65.51 118.68 6,347.39 6,276.94 -4,783.34 8,008.06 5,960,724.02 1,497,501.44 0.18 7,983.00 MWD+IFR-AK-CAZ-SC (4) 12,139.12 65.56 118.79 6,385.60 6,315.15 -4,823.71 8,081.69 5,960,682.19 1,497,574.24 0.12 8,053.21 MWD+IFR-AK-CAZ-SC (4) 12,233.31 66.14 118.41 6,424.13 6,353.68 -4,864.85 8,157.15 5,960,639.54 1,497,648.85 0.72 8,124.96 MWD+IFR-AK-CAZ-SC (4) 12,326.43 66.07 118.07 6,461.85 6,391.40 -4,905.14 8,232.15 5,960,597.76 1,497,723.03 0.34 8,195.74 MWD+IFR-AK-CAZ-SC (4) 12,422.58 66.04 117.55 6,500.88 6,430.43 -4,946.13 8,309.88 5,960,555.21 1,497,799.91 0.50 8,268.43 MWD+IFR-AK-CAZ-SC (4) 12,516.13 66.01 117.75 6,538.89 6,468.44 -4,985.80 8,385.60 5,960,514.04 1,497,874.80 0.20 8,339.00 MWD+IFR-AK-CAZ-SC (4) 12,610.15 65.95 117.93 6,577.16 6,506.71 -5,025.91 8,461.53 5,960,472.42 1,497,949.92 0.19 8,410.06 MWD+IFR-AK-CAZ-SC (4) 12,704.01 65.91 118.06 6,615.44 6,544.99 -5,066.13 8,537.21 5,960,430.68 1,498,024.76 0.13 8,481.10 MWD+IFR-AK-CAZ-SC (4) 12,797.27 65.94 117.44 6,653.49 6,583.04 -5,105.78 8,612.56 5,960,389.53 1,498,099.30 0.61 8,551.49 MWD+IFR-AK-CAZ-SC (4) 12,889.72 66.07 117.82 6,691.08 6,620.63 -5,144.95 8,687.39 5,960,348.87 1,498,173.32 0.40 8,621.20 MWD+IFR-AK-CAZ-SC (4) 12,984.74 66.11 117.20 6,729.59 6,659.14 -5,185.07 8,764.43 5,960,307.21 1,498,249.53 0.60 8,692.80 MWD+IFR-AK-CAZ-SC (4) 13,078.29 65.60 117.77 6,767.86 6,697.41 -5,224.47 8,840.16 5,960,266.31 1,498,324.45 0.78 8,763.14 MWD+IFR-AK-CAZ-SC (4) 13,171.16 65.52 118.60 6,806.28 6,735.83 -5,264.40 8,914.68 5,960,224.89 1,498,398.15 0.82 8,833.38 MWD+IFR-AK-CAZ-SC (4) 13,266.22 65.86 119.22 6,845.42 6,774.97 -5,306.28 8,990.52 5,960,181.49 1,498,473.12 0.69 8,905.96 MWD+IFR-AK-CAZ-SC (4) 13,359.66 65.96 118.69 6,883.56 6,813.11 -5,347.58 9,065.16 5,960,138.71 1,498,546.91 0.53 8,977.46 MWD+IFR-AK-CAZ-SC (4) 13,453.44 65.63 117.83 6,922.01 6,851.56 -5,388.08 9,140.50 5,960,096.71 1,498,621.42 0.91 9,048.59 MWD+IFR-AK-CAZ-SC (4) 13,547.24 65.50 119.12 6,960.81 6,890.36 -5,428.79 9,215.56 5,960,054.50 1,498,695.64 1.26 9,119.78 MWD+IFR-AK-CAZ-SC (4) 13,641.15 65.47 119.07 6,999.78 6,929.33 -5,470.34 9,290.22 5,960,011.46 1,498,769.45 0.06 9,191.52 MWD+IFR-AK-CAZ-SC (4) 13,734.37 65.54 118.83 7,038.43 6,967.98 -5,511.40 9,364.45 5,959,968.92 1,498,842.83 0.25 9,262.62 MWD+IFR-AK-CAZ-SC (4) 13,827.74 65.28 117.91 7,077.28 7,006.83 -5,551.74 9,439.16 5,959,927.09 1,498,916.71 0.94 9,333.31 MWD+IFR-AK-CAZ-SC (4) 13,921.59 65.19 118.28 7,116.60 7,046.15 -5,591.88 9,514.33 5,959,885.46 1,498,991.06 0.37 9,404.04 MWD+IFR-AK-CAZ-SC (4) 14,014.98 65.22 117.72 7,155.76 7,085.31 -5,631.68 9,589.19 5,959,844.16 1,499,065.09 0.55 9,474.33 MWD+IFR-AK-CAZ-SC (4) 14,109.07 65.26 118.12 7,195.17 7,124.72 -5,671.68 9,664.69 5,959,802.65 1,499,139.76 0.39 9,545.09 MWD+IFR-AK-CAZ-SC (4) 14,202.98 65.22 117.93 7,234.50 7,164.05 -5,711.75 9,739.96 5,959,761.08 1,499,214.22 0.19 9,615.81 MWD+IFR-AK-CAZ-SC (4) 14,296.25 65.75 118.61 7,273.20 7,202.75 -5,751.94 9,814.70 5,959,719.40 1,499,288.13 0.87 9,686.39 MWD+IFR-AK-CAZ-SC (4) 14,389.83 66.77 119.72 7,310.87 7,240.42 -5,793.69 9,889.50 5,959,676.16 1,499,362.07 1.54 9,758.36 MWD+IFR-AK-CAZ-SC (4) 14,483.30 68.61 119.67 7,346.36 7,275.91 -5,836.53 9,964.61 5,959,631.83 1,499,436.30 1.97 9,831.45 MWD+IFR-AK-CAZ-SC (4) 14,577.19 70.60 119.61 7,379.07 7,308.62 -5,880.05 10,041.10 5,959,586.78 1,499,511.89 2.12 9,905.78 MWD+IFR-AK-CAZ-SC (4) 14,671.64 74.36 118.47 7,407.50 7,337.05 -5,923.75 10,119.83 5,959,541.51 1,499,589.72 4.14 9,981.34 MWD+IFR-AK-CAZ-SC (4) 14,766.17 76.79 117.86 7,431.05 7,360.60 -5,966.96 10,200.54 5,959,496.69 1,499,669.54 2.65 10,057.37 MWD+IFR-AK-CAZ-SC (4) 14,858.93 79.19 118.06 7,450.35 7,379.90 -6,009.49 10,280.67 5,959,452.56 1,499,748.79 2.60 10,132.55 MWD+IFR-AK-CAZ-SC (4) 14,953.15 79.58 118.16 7,467.71 7,397.26 -6,053.13 10,362.35 5,959,407.30 1,499,829.58 0.43 10,209.43 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 9:46:10PM Page 6 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey MD (usft) 15,046.95 15,141.26 15,233.58 15,327.33 15,420.95 15,515.86 15,570.58 7-5/8" Inc (°) 79.69 79.67 80.53 81.34 81.98 82.57 85.13 x 9-7/8" Azi (°) 119.36 119.78 120.85 123.18 126.10 128.99 131.47 by 11" TVD (usft) 7,484.58 7,501.48 7,517.35 7,532.12 7,545.71 7,558.47 7,564.33 TVDSS (usft) 7,414.13 7,431.03 7,446.90 7,461.67 7,475.26 7,488.02 7,493.88 +N/ -S (usft) -6,097.52 -6,143.31 -6,189.21 -6,238.29 -6,290.94 -6,348.25 -6,383.38 +E/ -W (usft) 10,443.24 10,523.94 10,602.45 10,680.94 10,757.14 10,831.70 10,873.22 Map Northing (ft) 5,959,361.29 5,959,313.90 5,959,266.43 5,959,215.79 5,959,161.62 5,959,102.83 5,959,066.87 Map Easting (ft) 1,499,909.55 1,499,989.31 1,500,066.87 1,500,144.35 1,500,219.48 1,500,292.86 1,500,333.67 US (°/100') 1.26 0.44 1.47 2.60 3.16 3.08 6.49 Vertical Section (ft) Survey Tool Name 10,286.60 MWD+IFR-AK-CAZ-SC (4) 10,364.91 MWD+IFR-AK-CAZ-SC (4) 10,442.30 MWD+IFR-AK-CAZ-SC (4) 10,522.48 MWD+IFR-AK-CAZ-SC (4) 10,604.74 MWD+IFR-AK-CAZ-SC (4) 10,690.34 MWD+IFR-AK-CAZ-SC (4) 10,740.86fl OT an Actual Su 15,596.06 86.32 132.62 7,566.23 7,495.78 -6,400.40 10,892.09 5,959,049.48 1,500,352.19 6.49 10,764.74 MWD+IFR-AK-CAZ-SC (5) 15,624.47 87.57 132.14 7,567.75 7,497.30 -6,419.52 10,913.05 5,959,029.95 1,500,372.76 4.71 10,791.47 MWD+IFR-AK-CAZ-SC (5) 15,719.67 87.06 132.15 7,572.21 7,501.76 -6,483.33 10,983.56 5,958,964.74 1,500,441.97 0.54 10,880.91 MWD+IFR-AK-CAZ-SC (5) 15,816.56 87.18 132.78 7,577.07 7,506.62 -6,548.66 11,054.94 5,958,897.99 1,500,512.02 0.66 10,972.10 MWD+IFR-AK-CAZ-SC (5) 15,910.31 87.07 132.33 7,581.78 7,511.33 -6,611.98 11,123.91 5,958,833.30 1,500,579.70 0.49 11,060.40 MWD+IFR-AK-CAZ-SC (5) 16,005.46 87.20 133.48 7,586.53 7,516.08 -6,676.68 11,193.52 5,958,767.22 1,500,647.99 1.21 11,150.20 MWD+IFR-AK-CAZ-SC (5) 16,101.56 87.85 132.62 7,590.68 7,520.23 -6,742.22 11,263.68 5,958,700.29 1,500,716.81 1.12 11,241.00 MWD+IFR-AK-CAZ-SC (5) 16,195.64 89.19 133.54 7,593.11 7,522.66 -6,806.45 11,332.37 5,958,634.70 1,500,784.19 1.73 11,329.97 MWD+IFR-AK-CAZ-SC (5) 16,291.29 88.98 132.21 7,594.64 7,524.19 -6,871.52 11,402.45 5,958,568.24 1,500,852.95 1.41 11,420.32 MWD+IFR-AK-CAZ-SC (5) 16,385.89 89.93 133.55 7,595.54 7,525.09 -6,935.89 11,471.77 5,958,502.49 1,500,920.96 1.74 11,509.70 MWD+IFR-AK-CAZ-SC (5) 16,480.41 89.99 135.19 7,595.60 7,525.15 -7,001.98 11,539.33 5,958,435.06 1,500,987.17 1.74 11,599.77 MWD+IFR-AK-CAZ-SC (5) 16,575.56 89.86 136.48 7,595.73 7,525.28 -7,070.24 11,605.63 5,958,365.50 1,501,052.08 1.36 11,691.16 MWD+IFR-AK-CAZ-SC (5) 16,670.89 88.90 141.38 7,596.76 7,526.31 -7,142.08 11,668.23 5,958,292.42 1,501,113.22 5.24 11,783.99 MWD+IFR-AK-CAZ-SC (5) 16,766.40 89.44 146.55 7,598.15 7,527.70 -7,219.28 11,724.39 5,958,214.11 1,501,167.82 5.44 11,878.52 MWD+IFR-AK-CAZ-SC (5) 16,860.74 90.31 147.35 7,598.35 7,527.90 -7,298.35 11,775.84 5,958,134.02 1,501,217.67 1.25 11,972.49 MWD+IFR-AK-CAZ-SC (5) 16,956.67 90.23 146.42 7,597.90 7,527.45 -7,378.70 11,828.25 5,958,052.65 1,501,268.44 0.97 12,068.03 MWD+IFR-AK-CAZ-SC (5) 17,051.13 90.31 147.11 7,597.45 7,527.00 -7,457.71 11,880.02 5,957,972.62 1,501,318.61 0.74 12,162.10 MWD+IFR-AK-CAZ-SC (5) 17,148.13 89.56 149.30 7,597.56 7,527.11 -7,540.15 11,931.13 5,957,889.18 1,501,368.05 2.39 12,258.88 MWD+IFR-AK-CAZ-SC (5) 17,240.81 87.84 150.53 7,599.67 7,529.22 -7,620.32 11,977.57 5,957,808.10 1,501,412.87 2.28 12,351.47 MWD+IFR-AK-CAZ-SC (5) 17,336.50 87.75 150.23 7,603.35 7,532.90 -7,703.44 12,024.83 5,957,724.05 1,501,458.45 0.33 12,447.05 MWD+IFR-AK-CAZ-SC (5) 17,431.46 90.30 151.02 7,604.96 7,534.51 -7,786.17 12,071.40 5,957,640.40 1,501,503.34 2.81 12,541.96 MWD+IFR-AK-CAZ-SC (5) 17,527.24 90.95 152.13 7,603.92 7,533.47 -7,870.40 12,116.99 5,957,555.28 1,501,547.22 1.34 12,637.73 MWD+IFR-AK-CAZ-SC (5) 17,622.07 89.62 153.34 7,603.45 7,533.00 -7,954.69 12,160.43 5,957,470.15 1,501,588.96 1.90 12,732.55 MWD+IFR-AK-CAZ-SC (5) 17,716.24 89.93 151.78 7,603.82 7,533.37 -8,038.26 12,203.82 5,957,385.73 1,501,630.66 1.69 12,826.71 MWD+IFR-AK-CAZ-SC (5) 17,812.74 89.72 151.73 7,604.11 7,533.66 -8,123.27 12,249.49 5,957,299.82 1,501,674.61 0.22 12,923.21 MWD+IFR-AK-CAZ-SC (5) 17,907.72 88.74 151.93 7,605.39 7,534.94 -8,206.99 12,294.32 5,957,215.22 1,501,717.75 1.05 13,018.18 MWD+IFR-AK-CAZ-SC (5) 18,003.03 88.54 151.00 7,607.65 7,537.20 -8,290.70 12,339.84 5,957,130.62 1,501,761.57 1.00 13,113.45 MWD+IFR-AK-CAZ-SC (5) 18,098.68 88.68 151.04 7,609.97 7,539.52 -8,374.35 12,386.17 5,957,046.07 1,501,806.21 0.15 13,209.06 MWD+IFR-AK-CAZ-SC (5) 18,193.93 88.78 151.63 7,612.08 7,541.63 -8,457.90 12,431.85 5,956,961.62 1,501,850.20 0.63 13,304.28 MWD+IFR-AK-CAZ-SC (5) 18,288.94 89.27 152.24 7,613.70 7,543.25 -8,541.73 12,476.54 5,956,876.92 1,501,893.19 0.82 13,399.28 MWD+IFR-AK-CAZ-SC (5) 18,384.43 89.47 153.14 7,614.75 7,544.30 -8,626.57 12,520.35 5,956,791.22 1,501,935.28 0.97 13,494.75 MWD+IFR-AK-CAZ-SC (5) 18,480.69 90.03 152.57 7,615.17 7,544.72 -8,712.22 12,564.26 5,956,704.71 1,501,977.47 0.83 13,591.00 MWD+IFR-AK-CAZ-SC (5) 121212016 9:46.10PM Page 7 COMPASS 5000 1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99A Survey Calculation Method: Minimum Curvature Design: CD5-99A Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 18,576.20 89.71 153.04 7,615.39 7,544.94 -8,797.18 12,607.91 5,956,618.90 1,502,019.40 0.60 13,686.50 MWD+IFR-AK-CAZ-SC (5) 18,671.80 89.75 151.63 7,615.84 7,545.39 -8,881.84 12,652.30 5,956,533.37 1,502,062.07 1.48 13,782.10 MWD+IFR-AK-CAZ-SC (5) 18,767.80 89.82 152.07 7,616.20 7,545.75 -8,966.49 12,697.59 5,956,447.84 1,502,105.65 0.46 13,878.10 MWD+IFR-AK-CAZ-SC (5) 18,861.96 89.75 153.35 7,616.55 7,546.10 -9,050.16 12,740.76 5,956,363.31 1,502,147.13 1.36 13,972.25 MWD+IFR-AK-CAZ-SC (5) 18,957.52 89.22 152.95 7,617.41 7,546.96 -9,135.42 12,783.92 5,956,277.22 1,502,188.56 0.69 14,067.78 MWD+IFR-AK-CAZ-SC (5) 19,052.27 89.79 152.30 7,518.23 7,547.78 -9,219.55 12,827.48 5,956,192.23 1,502,230.43 0.91 14,162.52 MWD+IFR-AK-CAZ-SC (5) 19,148.41 89.43 152.40 7,618.88 7,548.43 -9,304.71 12,872.10 5,956,106.20 1,502,273.32 0.39 14,258.66 MWD+IFR-AK-CAZ-SC (5) 19,244.33 89.34 152.27 7,619.91 7,549.46 -9,389.66 12,916.63 5,956,020.38 1,502,316.13 0.16 14,354.57 MWD+IFR-AK-CAZ-SC (5) 19,339.86 89.16 151.97 7,621.16 7,550.71 -9,474.10 12,961.30 5,955,935.07 1,502,359.09 0.37 14,450.09 MWD+IFR-AK-CAZ-SC (5) 19,436.17 88.91 151.14 7,622.78 7,552.33 -9,558.77 13,007.17 5,955,849.50 1,502,403.25 0.90 14,546.38 MWD+IFR-AK-CAZ-SC (5) 19,531.99 89.49 150.20 7,624.12 7,553.67 -9,642.29 13,054.10 5;955,765.05 1,502,448.49 1.15 14,642.17 MWD+IFR-AK-CAZ-SC (5) 19,624.64 89.06 150.51 7,625.29 7,554.84 -9,722.81 13,099.92 5,955,683.64 1,502,492.68 0.57 14,734.77 MWD+IFR-AK-CAZ-SC (5) 19,722.54 88.74 151.43 7,627.17 7,556.72 -9,808.39 13,147.42 5,955,597.13 1,502,538.44 0.99 14,832.64 MWD+IFR-AK-CAZ-SC (5) 19,814.91 89.09 151.61 7,628.92 7,558.47 -9,889.57 13,191.46 5,955,515.09 1,502,580.84 0.43 14,924.99 MWD+IFR-AK-CAZ-SC (5) 19,909.92 89.76 151.88 7,629.88 7,559.43 -9,973.25 13,236.43 5,955,430.52 1,502,624.12 0.76 15,019.99 MWD+IFR-AK-CAZ-SC (5) 20,006.12 89.71 151.08 7,630.32 7,559.87 -10,057.78 13,282.36 5,955,345.10 1,502,668.34 0.83 15,116.18 MWD+IFR-AK-CAZ-SC (5) 20,101.20 90.02 150.62 7,630.55 7,560.10 -10,140.82 13,328.68 5,955,261.15 1,502,712.98 0.58 15,211.24 MWD+IFR-AK-CAZ-SC (5) 20,196.48 90.10 151.23 7,630.45 7,560.00 -10,224.09 13,374.98 5,955,176.97 1,502,757.59 0.65 15,306.51 MWD+IFR-AK-CAZ-SC (5) 20,292.68 89.47 151.56 7,630.81 7,560.36 -10,308.55 13,421.04 5,955,091.62 1,502,801.94 0.74 15,402.70 MWD+IFR-AK-CAZ-SC (5) 20,387.59 89.17 151.84 7,631.93 7,561.48 -10,392.11 13,466.03 5,955,007.17 1,502,845.24 0.43 15,497.60 MWD+IFR-AK-CAZ-SC (5) 20,482.78 88.57 151.47 7,633.81 7,563.36 -10,475.87 13,511.21 5,954,922.53 1,502,888.73 0.74 15,592.77 MWD+IFR-AK-CAZ-SC (5) 20,578.73 88.95 151.66 7,635.89 7,565.44 -10,560.22 13,556.89 5,954,837.28 1,502,932.70 0.44 15,688.70 MWD+IFR-AK-CAZ-SC (5) 20,674.03 89.61 150.34 7,637.08 7,566.63 -10,643.56 13,603.09 5,954,753.03 1,502,977.21 1.55 15,783.97 MWD+IFR-AK-CAZ-SC (5) 20,768.65 89.95 150.36 7,637.45 7,567.00 -10,725.79 13,649.90 5,954,669.89 1,503,022.36 0.36 15,878.55 MWD+IFR-AK-CAZ-SC (5) 20,864.50 90.17 150.51 7,637.35 7,566.90 -10,809.16 13,697.19 5,954,585.59 1,503,067.96 0.28 15,974.37 MWD+IFR-AK-CAZ-SC (5) 20,958.88 89.71 150.31 7,637.45 7,567.00 -10,891.23 13,743.79 5,954,502.60 1,503,112.90 0.53 16,068.71 MWD+IFR-AK-CAZ-SC (5) 21,057.19 89.19 150.71 7,638.39 7,567.94 -10,976.80 13,792.19 5,954,416.09 1,503,159.56 0.67 16,166.98 MWD+IFR-AK-CAZ-SC (5) 21,152.71 89.03 152.00 7,639.87 7,569.42 -11,060.62 13,837.97 5,954,331.37 1,503,203.65 1.36 16,262.48 MWD+IFR-AK-CAZ-SC (5) 21,245.12 89.02 151.58 7,641.45 7,571.00 -11,142.04 13,881.65 5,954,249.10 1,503,245.68 0.45 16,354.88 MWD+IFR-AK-CAZ-SC (5) 21,341.83 89.20 151.35 7,642.95 7,572.50 -11,226.99 13,927.84 5,954,163.24 1,503,290.15 0.30 16,451.57 MWD+IFR-AK-CAZ-SC (5) 21,434.86 89.09 152.02 7,644.34 7,573.89 -11,308.88 13,971.96 5,954,080.49 1,503,332.62 0.73 16,544.59 MWD+IFR-AK-CAZ-SC (5) 21,530.74 89.40 152.79 7,645.60 7,575.15 -11,393.85 14,016.37 5,953,994.65 1,503,375.31 0.87 16,640.46 MWD+IFR-AK-CAZ-SC (5) 21,626.52 89.89 152.33 7,646.19 7,575.74 -11,478.85 14,060.50 5,953,908.79 1,503,417.72 0.70 16,736.23 MWD+IFR-AK-CAZ-SC (5) 21,720.74 89.95 152.90 7,646.32 7,575.87 -11,562.51 14,103.84 5,953,824.28 1,503,459.37 0.61 16,830.44 MWD+IFR-AK-CAZ-SC (5) 21,816.41 89.89 153.44 7,646.46 7,576.01 -11,647.88 14,147.02 5,953,738.07 1,503,500.82 0.57 16,926.09 MWD+IFR-AK-CAZ-SC (5) 21,912.14 89.60 152.85 7,646.88 7,576.43 -11,733.29 14,190.27 5,953,651.82 1,503,542.34 0.69 17,021.80 MWD+IFR-AK-CAZ-SC (5) 22,006.41 89.68 153.24 7,647.48 7,577.03 -11,817.31 14,233.00 5,953,566.96 1,503,583.37 0.42 17,116.06 MWD+IFR-AK-CAZ-SC (5) 22,102.55 89.46 154.22 7,648.20 7,577.75 -11,903.52 14,275.55 5,953,479.92 1,503,624.18 1.04 17,212.15 MWD+IFR-AK-CAZ-SC (5) 22,196.50 89.94 152.85 7,648.69 7,578.24 -11,987.62 14,317.41 5,953,395.00 1,503,664.34 1.55 17,306.06 MWD+IFR-AK-CAZ-SC (5) 22,291.55 88.93 153.81 7,649.63 7,579.18 -12,072.55 14,360.07 5,953,309.23 1,503,705.29 1.47 17,401.08 MWD+IFR-AK-CAZ-SC (5) 12/212016 9:46:10PM Page 8 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhiIli ps(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: CD5-99 North Reference: Wellbore: CD5-99A Survey Calculation Method: Design: CD5-99A Database: Survey Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production 12/2/2016 9:46:10PM Page 9 COMPASS 5000,1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N1 -S +E/ -W Northing Easting DLS Section (usft) V) (") (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 22,387.41 87.76 153.13 7,652.40 7,581.95 -12,158.28 14,402.87 5,953,222.67 1,503,746.35 1.41 17,496.86 MWD+IFR-AK-CAZ-SC (5) 22,482.42 86.16 154.14 7,657.43 7,586.98 -12,243.28 14,445.01 5,953,136.84 1,503,786.76 1.99 17,591.70 MWD+IFR-AK-CAZ-SC (5) 22,577.92 85.72 154.23 7,664.20 7,593.75 -12,329.04 14,486.49 5,953,050.28 1,503,826.51 0.47 17,686.89 MWD+IFR-AK-CAZ-SC (5) 22,673.00 86.03 153.56 7,671.04 7,600.59 -12,414.20 14,528.22 5,952,964.31 1,503,866.52 0.77 17,781.67 MWD+IFR-AK-CAZ-SC (5) 22,769.07 86.91 151.81 7,676.95 7,606.50 -12,499.39 14,572.22 5,952,878.25 1,503,908.79 2.04 17,877.55 MWD+IFR-AK-CAZ-SC (5) 22,863.71 87.17 152.23 7,681.84 7,611.39 -12,582.85 14,616.56 5,952,793.92 1,503,951.45 0.52 17,972.06 MWD+IFR-AK-CAZ-SC (5) 22,959.78 88.02 150.53 7,685.87 7,615.42 -12,667.11 14,662.53 5,952,708.77 1,503,995.72 1.98 18,068.03 MWD+IFR-AK-CAZ-SC (5) 23,054.67 89.55 149.79 7,687.88 7,617.43 -12,749.40 14,709.74 5,952,625.55 1,504,041.26 1.79 18,162.85 MWD+IFR-AK-CAZ-SC (5) 23,150.22 90.20 148.86 7,688.09 7,617.64 -12,831.57 14,758.48 5,952,542.42 1,504,088.34 1.19 18,258.29 MWD+IFR-AK-CAZ-SC (5) 23,245.63 90.44 148.39 7,687.56 7,617.11 -12,913.03 14,808.15 5,952,459.99 1,504,136.36 0.55 18,353.54 MWD+IFR-AK-CAZ-SC (5) 23,341.14 90.43 148.62 7,686.83 7,616.38 -12,994.47 14,858.05 5,952,377.57 1,504,184.61 0.24 18,448.87 MWD+IFR-AK-CAZ-SC (5) 23,436.29 90.50 147.48 7,686.06 7,615.61 -13,075.20 14,908.40 5,952,295.85 1,504,233.32 1.20 18,543.79 MWD+IFR-AK-CAZ-SC (5) 23,531.66 90.40 148.68 7,685.31 7,614.86 -13,156.15 14,958.82 5,952,213.91 1,504,282.10 1.26 18,638.93 MWD+IFR-AK-CAZ-SC (5) 23,627.17 90.50 148.17 7,684.56 7,614.11 -13,237.51 15,008.83 5,952,131.56 1,504,330.46 0.54 18,734.25 MWD+IFR-AK-CAZ-SC (5) 23,722.45 90.61 147.18 7,683.64 7,613.19 -13,318.02 15,059.78 5,952,050.05 1,504,379.78 1.05 18,829.25 MWD+IFR-AK-CAZ-SC (5) 23,818.08 90.20 147.00 7,682.96 7,612.51 -13,398.30 15,111.73 5,951,968.75 1,504,430.11 0.47 18,924.53 MWD+IFR-AK-CAZ-SC (5) 23,912.47 89.33 146.87 7,683.35 7,612.90 -13,477.41 15,163.23 5,951,888.63 1,504,480.00 0.93 19,018.55 MWD+IFR-AK-CAZ-SC (5) 24,008.43 88.55 146.42 7,685.12 7,614.67 -13,557.55 15,215.98 5,951,807.46 1,504,531.13 0.94 19,114.07 MWD+IFR-AK-CAZ-SC (5) 24,054.81 89.52 146.63 7,685.91 7,615.46 -13,596.23 15,241.56 5,951,768.27 1,504,555.92 2.14 19,160.23 MWD+IFR-AK-CAZ-SC (5) 24,152.88 89.58 143.63 7,686.68 7,616.23 -13,676.68 15,297.62 5,951,686.72 1,504,610.35 3.06 19,257.59 MWD+IFR-AK-CAZ-SC (6) 24,210.98 89.04 143.76 7,687.38 7,616.93 -13,723.49 15,332.02 5,951,639.22 1,504,643.80 0.96 19,315.07 MWD+IFR-AK-CAZ-SC (6) 24,307.25 87.77 144.22 7,690.06 7,619.61 -13,801.34 15,388.59 5,951,560.27 1,504,698.80 1.40 19,410.36 MWD+IFR-AK-CAZ-SC (6) 24,400.47 88.47 145.38 7,693.11 7,622.66 -13,877.47 15,442.30 5,951,483.08 1,504,750.96 1.45 19,502.80 MWD+IFR-AK-CAZ-SC (6) 24,495.14 89.89 145.91 7,694.47 7,624.02 -13,955.61 15,495.71 5,951,403.88 1,504,802.79 1.60 19,596.87 MWD+IFR-AK-CAZ-SC (6) 24,591.21 91.20 146.81 7,693.55 7,623.10 -14,035.59 15,548.93 5,951,322.86 1,504,854.38 1.65 19,692.47 MWD+IFR-AK-CAZ-SC (6) 24,686.38 92.09 146.46 7,690.82 7,620.37 -14,115.04 15,601.25 5,951,242.38 1,504,905.09 1.00 19,787.18 MWD+IFR-AK-CAZ-SC (6) 24,781.66 88.25 144.74 7,690.54 7,620.09 -14,193.64 15,655.07 5,951,162.72 1,504,957.32 4.42 19,881.85 MWD+IFR-AK-CAZ-SC (6) 24,876.98 89.08 147.46 7,692.76 7,622.31 -14,272.73 15,708.21 5,951,082.59 1,505,008.86 2.98 19,976.63 MWD+IFR-AK-CAZ-SC (6) 24,972.91 89.65 147.87 7,693.82 7,623.37 -14,353.77 15,759.52 5,951,000.53 1,505,058.52 0.73 20,072.28 MWD+IFR-AK-CAZ-SC (6) 25,067.52 90.11 149.19 7,694.02 7,623.57 -14,434.47 15,808.91 5,950,918.87 1,505,106.28 1.48 20,166.71 MWD+IFR-AK-CAZ-SC (6) 25,162.05 89.62 151.18 7,694.24 7,623.79 -14,516.48 15,855.91 5,950,835.94 1,505,151.61 2.17 20,261.19 MWD+IFR-AK-CAZ-SC (6) 25,258.05 88.92 153.15 7,695.47 7,625.02 -14,601.36 15,900.72 5,950,750.18 1,505,194.72 2.18 20,357.17 MWD+IFR-AK-CAZ-SC (6) 25,352.29 89.09 154.54 7,697.10 7,626.65 -14,685.94 15,942.26 5,950,664.79 1,505,234.54 1.49 20,451.35 MWD+IFR-AK-CAZ-SC (6) 25,448.78 89.85 155.27 7,698.00 7,627.55 -14,773.31 15,983.18 5,950,576.62 1,505,273.69 1.09 20,547.71 MWD+IFR-AK-CAZ-SC (6) 25,542.99 90.44 155.97 7,697.76 7,627.31 -14,859.12 16,022.07 5,950,490.05 1,505,310.85 0.97 20,641.73 MWD+IFR-AK-CAZ-SC (6) 25,639.81 90.45 155.89 7,697.01 7,626.56 -14,947.52 16,061.55 5,950,400.88 1,505,348.55 0.08 20,738.32 MWD+IFR-AK-CAZ-SC (6) 25,734.05 89.75 155.16 7,696.84 7,626.39 -15,033.29 16,100.60 5,950,314.35 1,505,385.86 1.07 20,832.38 MWD+IFR-AK-CAZ-SC (6) 25,829.81 89.26 155.35 7,697.67 7,627.22 -15,120.25 16,140.68 5,950,226.61 1,505,424.18 0.55 20,927.98 MWD+IFR-AK-CAZ-SC (6) 25,925.05 89.34 155.68 7,698.83 7,628.38 -15,206.92 16,180.15 5,950,139.17 1,505,461.90 0.36 21,023.03 MWD+IFR-AK-CAZ-SC (6) 26,020.23 89.12 156.05 7,700.11 7,629.66 -15,293.77 16,219.06 5,950,051.56 1,505,499.06 0.45 21,117.99 MWD+IFR-AK-CAZ-SC (6) 12/2/2016 9:46:10PM Page 9 COMPASS 5000,1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-99 Wellbore: CD5-99A Design: CD5-99A Survey SLB Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production 12/2/2016 9:46. IOPM Page 10 COMPASS 5000 1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 26,115.95 89.80 157.62 7,701.01 7,630.56 -15,381.77 16,256.71 5,949,962.83 1,505,534.93 1.79 21,213.36 MWD+IFR-AK-CAZ-SC (6) 26,210.73 89.50 157.48 7,701.59 7,631.14 -15,469.36 16,292.91 5,949,874.54 1,505,569.36 0.35 21,307.69 MWD+IFR-AK-CAZ-SC (6) 26,306.42 89.51 156.70 7,702.42 7,631.97 -15,557.50 16,330.16 5,949,785.67 1,505,604.82 0.82 21,403.00 MWD+IFR-AK-CAZ-SC (6) 26,401.88 89.61 156.84 7,703.15 7,632.70 -15,645.22 16,367.81 5,949,697.22 1,505,640.70 0.18 21,498.13 MWD+IFR-AK-CAZ-SC (6) 26,495.47 89.69 156.57 7,703.72 7,633.27 -15,731.18 16,404.82 5,949,610.54 1,505,675.98 0.30 21,591.40 MWD+IFR-AK-CAZ-SC (6) 26,592.93 88.99 155.83 7,704.85 7,634.40 -15,820.34 16,444.14 5,949,520.61 1,505,713.50 1.05 21,688.59 MWD+IFR-AK-CAZ-SC (6) 26,685.50 88.85 155.84 7,706.59 7,636.14 -15,904.79 16,482.03 5,949,435.43 1,505,749.68 0.15 21,780.94 MWD+IFR-AK-CAZ-SC (6) 26,781.13 88.89 155.16 7,708.48 7,638.03 -15,991.79 16,521.68 5,949,347.66 1,505,787.57 0.71 21,876.37 MWD+IFR-AK-CAZ-SC (6) 25,877.15 89.00 154.03 7,710.25 7,639.80 -16,078.51 16,562.87 5,949,260.14 1,505,827.01 1.18 21,972.28 MWD+IFR-AK-CAZ-SC (6) 26,971.81 88.54 153.04 7,712.28 7,641.83 -16,163.23 16,605.04 5,949,174.59 1,505,867.47 1.15 22,066.88 MWD+IFR-AK-CAZ-SC (6) 27,067.89 88.55 153.11 7,714.72 7,644.27 -16,248.86 16,648.54 5,949,088.11 1,505,909.23 0.07 22,162.91 MWD+IFR-AK-CAZ-SC (6) 27,070.93 88.55 153.11 7,714.79 7,644.34 -16,251.58 16,649.91 5,949,085.37 1,505,910.55 0.00 22,165.95 4-1/2" x 6-3/4.. 27,128.00 88.55 153.11 7,716.24 7,645.79 -16,302.46 16,675.71 5,949,033.98 1,505,935.32 0.00 22,222.99 PROJECTEDtoTD 12/2/2016 9:46. IOPM Page 10 COMPASS 5000 1 Build 74 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. PI Yes ❑ No 1 have checked to the best of my ability that the following data is correct. F,_1 Surface Coordinates 2] Declination & Convergence 0 GRS Survey Corrections Digitally signed by Survey Tool Codes96 Brij Hall-Potnis Date: 2016.12.02 SLB DE: 21:50:10 -09'00' Client Representative: Date: david.l.lee@con An�id,llrc*conocaphilllps rnm ocophillips.com �a�r201612050G1653 oyoo P7 -D 2/�, - i22 Loepp, Victoria T (DOA) From: Lee, David L <David.L.Lee@conocophillips.com> Sent: Wednesday, October 26, 2016 8:55 AM To: Loepp, Victoria T (DOA); Bettis, Patricia K (DOA) Cc: Earhart, Will C Subject: CD5-99A Top of cement log Attachments: ConocoPhillips CD5-99 Top of Cement Analysis Scale 600.pdf; Cement Detail Report.pdf, Daily Drilling Report.pdf Follow Up Flag: Follow up Flag Status: Flagged Good morning Victoria, attached please find the top of cement log for CD5-99A (with the top identified in the text below). Also find the daily report of the cement job and the cement job report. When we drilled out our intermediate casing shoe we were able to obtain a good 12.5 ppg EMW FIT. if you need any other information please let me know. Thanks David From: Jason Burt [mailto:JBurt2@slb.com] Sent: Sunday, October 23, 201610:18 PM To: Lee, David L <David.L.Lee @conocophillips.com>; Earhart, Will C <William.C.Earhart@conocophillips.com> Cc: Stephen Lauper <SLauper@slb.com>; Erik Sterk <ESterk@slb.com> Subject: [EXTERNAL]CD5-99 Top of cement log Schlumberger -Private Hi David and Will, I have processed the top of cement for CD5-99. The top of cement is identified at 13,078 ft MD and I have included a log with a 1:600 scale with this email. The logs and data have also been uploaded to the following interACT folder. Top > CPAI > Colville River Unit > CDS-99 > Sonic Top of Cement Please let me kow if you have any questions. Regards, Jason ................................................................... Jason Burt Ph.D. Schlumberger I sls Senior Petrophysicist & Well Placement Engineer 1 CCMRW ConocoPhillips Alaska, Inc. - VEL: CD5-99 C 0 71`1G n O —i M O FIRD. Colvile Alaska River Unit co M STATE z D r COUNTR`. USA 70 Flim EXT ^' II -o Z (Jt Cn rJ 0 cr c>nnn �a,�-o CD C, cno c(Zc o �' • O"00 CD CD -1�. -a' O • (n � D V • • 0 • 4A 0 0 M Wok FOLD HERE: the well nave, loca6m aid borehde reRmnce data were finished by the arstorrrvr. Any irbpi4Aork researdj ardysis, data, resdts, estinT(es, or recam m finished with the services or dherwise omm healed by Shcurterger to the astomer at any tirne in connection with the services are cpirims based on iniererrces from measuerTut, empirical rdaficrships, axis assurpbons; which, inferences, empirical relationships ador assmoons are not iriallible and with respect in whch Valbssiarals in the indrstry may differ: Accarinjy, Schunberger cannot at does rut warrant the aoc racy, mss, or corrpleress of any such irbprelabon, rescert analysis, dais, results, estimates, or rewmmJaliori N customer adm Wedges that it is accepting the services "as is," tEt ScHu barp makes no represertabon or waranty, express or implied, of any land or description in respect tla-eto, and that such services are delivered with the explicit uxlersUadng and agreerrat that any action taken based on the services received shall be at its own risk and responsibility, and no claim shall be made against ScHurbercer as a conseqjence teed.. Svc. Order #: OP Vers: Processed by: Process Date: 10/23/2016 Location: Tech log e-mnil:jburl2@slb.com Top of Cement indicated to be around 13,078 ft MD .e HIM r -� I 150 r� -152)0 1 1 1 1 ill.. I I I 4 153;. I F2"i },54 Rye I I I I 8; Ali I 1 Yf Ir -Jk I` I: l Ff 1 155 Casing CSID_PREVEIW 5 in 8 CSOD_PREVEIW o7NMMM(Drl-DM 0 000000000 n SPR _MH_FA R 1 i 3, 1 AFI L<F� i ax,s V -44.48 WF FILT MH 2 - R 1 I Casing Amplitude WFA MHT- R 1 5 in 8 DTSH_MH_FA_R_1 eferenc (ft) DTCO_MH FA_R_1 1:600 0 us 3000 1 -20 unitless 100 0 us 3000 Company: ConocoPhillips Alaska, Inc Well: CD5-99 Field: Colville River Unit State: Alaska Cou ntry: USA Schlumberger Security Level: AK Development Daily Drilling Report L CD5-99 w— -L., Report Number: 48 Rig: DOYON 19 Report Date: 10/13/2016 Well Type I AFE Typ Network/ID # AFE+Supp Ami (Cost) Development ORIGINAL 110390883 18,200,000.00 Wellbore Field Name DFS (days) DOL (days) Depth Progress (ft) Start Depth (RKB) End Depth (RKB) CD5-99A ALPINE 46.60 48.0 0.00 15,582.0 15,582.0 Daily Mud Field Est (Cost) Cumulative Mud Cost (Cost) Daily Cost Total (Cost) Cumulative Cost (Cost) 5,049.64 1,655,508.33 1,080,445.05 12,095,168.98 Actual Start Date Original Spud Date AFE Duration Total (days)Projected Job Duration (days) Job Days Ahead (days) Projected Job End Date 8/27/2016 8/28/2016 54.95 76.57 21.62 11/11/2016 Last Casing String Intermediate, 15,570.6ftKB Ops and Depth @ Morning Report 24hr Forecast Laying down 5" DP, flush and FP annulus on CD5-99 Continue laying down all 5" DP. Perform annular LOT and flush/ FP on CD5-99A annulus. C/O saver sub, cut/.slip. Test BOPE with 4" and 4'/2' test joints. M/U 63W' BHA and RIH P/U 4" DP. Last 24hr Summary Continue running casing and land hanger @ 15,570' MD. Condition and cement (2 stage) per program. Set and test packoff. Lay down 5" DP. Change out 7-5/8" rams to 3%" x 6" VBR. General Remarks Weather Head Count No AIS. Camp and Rig on Hi line power. Overcast, 27°F, Wind E 21 mph, WC 13, Vis 8 Imi 51.0 Supervisor Title Ken Harding Rig Supervisor Rob Reinhardt Rig Supervisor Joseph Engel Rig Engineer David Lee Drilling Engineer Time Log Start Time End Time Our (hr) Phase Op Code Activity Code Time P -T -X Trbl Code Trbl Class Start Depth (RKB) End Depth (ftKB) Operation 00:00 01:15 1.25 INTRM2 CASING PUTB P 15,392.0 15,570.0 Continue RIH with 7-5/8" Hyd563 29.7# L-80 casing from 15,392', M/U hanger and landing joint, land on hanger @ 15,570.58' MD. Calc Disp=177.56 bbl, Actual Disp=124 bbl. S/O=130k, P/U= N/A. SIMOPS verify pipe count and empty pipe shed. 01:15 01:45 0.50 INTRM2 CEMENT CIRC P 15,570.0 15,570.0 Establish circulation @ .5 bpm, 510 psi. SIMOPS- Load pipe shed with 4" DP. 01:45 02:15 0.50 INTRM2 CEMENT HOSO P 15,570.0 15,570.0 Shut down pumps, drain stack to verify hanger is landed, good per FMC. 02:15 07:15 5.00 INTRM2 CEMENT CIRC P 15,570.0 15,570.0 Circulate and condition mud for cement, .5 bpm to 8 bpm, 480-535 psi. Attempt to reciprocate pipe, P/U from 450k -490k max, no go. 07:15 07:30 0.25 INTRM2 CEMENT RURD P 15,570.0 15,570.0 Shut down pumps, blow down top drive. R/U cement lines. 07:30 09:00 1.50 INTRM2 CEMENT CIRC P 15,570.0 15,570.0 Continue circulate and condition @ 8 bpm, 830 psi. SIMOPS- PJSM on cement job. 09:00 12:00 3.00 INTRM2 CEMENT CMNT P 15,570.0 15,570.0 Flood lines with water, test lines to 3800 psi. SLB pumped 41 bbl of 12.5 ppg Mud Push H. Drop bottom plug. SLB pumped 154.5 bbl of 15.8 ppg cement. Drop top plug. SLB kick out with 20 bbl water, rig displaced with 6892 strokes to bump plug (694 bbl). CIP @ 11:50 hrs, no losses. Latest BOP Test Data Date Com 10/10/2016 1 ROPE Test- Test with 5" & 7 5/8" test Joint. TP.,t Anrufln�to 250/2,500 nsi for 5 min, Test choke valye% #1 - 14 and needlp valve to 2., Page 1/3 Report Printed: 10/26/2016 Security Level: AK Development Daily Drilling Report CD5-99 Report Number: 48 Rig: DOYON 19 Report Date: 10/13/2016 Time Log Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Trbl Code Trbl Class Start Depth (ftKB) End Depth (ftKB) Operation 12:00 13:15 1.25 INTRM2 CEMENT CIRC P 15,570.0 15,570.0 Open stage collar with 3150 psi, establish circulation to 8 bpm, 520 -530 psi. SIMOPS- PJSM on 2nd stage cement. 13:15 15:00 1.75 INTRM2 CEMENT CMNT P 15,570.0 15,570.0 Peform 2nd stage cement job. Flood cement lines, pressure test to 3000 psi. SLB pumped 42 bbl 12.5 ppg MudPush Il, 65 bbl 15.8 ppg cement. Drop closing plug. SLB kick out with 20.2 bbl water, rig displaced with 2867 stks (288 bbl). Bumped plug and pressure up to 1900 psi, held 5 minutes. Bleed pressure and check floats - good. CIP @ 14:34 hrs. 15:00 15:45 0.75 INTRM2 CEMENT RURD P 15,570.0 0.0 Blow down cement line, rig down and lay down Volant CRT, lay down landing joint. 15:45 16:15 0.50 INTRM2 CEMENT RURD P 0.0 0.0 Pick up test joint and M/U retrieval tool. Pull wear ring. 16:15 17:15 1.00 INTRM2 CEMENT WWSP P 0.0 0.0 Set and test 7-5/8" packoff to 5000 psi for 10 minutes witnessed by CPAI rep, good. 17:15 17:30 0.25 INTRM2 CEMENT RURD P 0.0 0.0 1 Lay down test joint, install 5" elevators. Grease iron roughneck and draw works. 17:30 00:00 6.50 INTRM2 CEMENT PULD P 0.0 0.0 Lay down 5 DP from derrick via mouse hole. SIMOPS - Replace mud lines in pits, C/O upper rams from 7-5/8" to 3%" x 6" VBR. Mud Check Data Type Depth (ftKB) Dens (Ib/gal) Vs (s/qt) PV Calc (cP) YP Calc (Ibf/100ft2) Gel (10s) (Ibf/100ft') Gel (10m) (Ibf/100ft') Gel (30m) (Ibf/100ft') MBT (Ib/bbl) HTHP Filtrate (mU30min) pH Density Temp ("F) Solids, Corr. (%) Low Solids 15,582.0 11.00 44 14.0 22.0 9.0 10.0 13.005 22.0 6.9 9.5 73.0 14.5 Non - Dispersed Low Solids 15,582.0 11.00 44 13.0 23.0 9.0 10.0 14.006 22.0 6.8 9.5 74.0 14.5 Non - Dispersed Low Solids 15,582.0 11.00 43 14.0 21.0 9.0 10.0 13.005 22.0 6.6 9.6 75.0 14.5 Non - Dispersed Low Solids 15,582.0 11.00 46 14.0 22.0 9.0 11.0 14.006 22.5 6.8 9.6 73.0 14.5 Non - Dispersed Injection Fluid Fluid Source From Lease (bbl) Dest Vendor Manifest Number Note Water Based Mud CD5-99 265.0 CD1-01 AES 477167 CD5-99 Source Well Water Based Mud CD5-99 265.0 CD1-01 AES 477168 CD5-99 Source Well Water Based Mud CD5-99 265.0 CD1-01 AES 477169 CD5-99 Source Well Water Based Mud CD5-99 250.0 CD1-01 AES 477170 CD5-99 Source Well Wel lbores Wellbore Name Wellbore API/UWI CD5-99A 501032074801 Page 2/3 Report Printed: 10/26/2016 Rig: DOYON 19 Daily Drilling Report CD5-99 Security Level: AK Development Report Number: 48 Report Date: 10/13/2016 Section Des Size (in) Act Top (ftKB) Act Btm (ftKB) Start Date End Date PROD2 CONDI SURFAC INTRM2 PROD1 63/4 24 131/2 11 6 3/4 36.6 115.0 2,347.0 15,582.0 115.0 2,347.0 15,582.0 4/14/2016 8/28/2016 10/1/2016 10/16/2016 4/14/2016 9/1/2016 10/16/2016 Casing Strings Csg Des Run Date OD (in) jWt/Len(lb/ft)j Grade I Set Depth (ftKB) I Com Intermediate 10/13/2016 1 75/81 29.70 1 L-80 1 15,570.6 Cement Intermediate Casing Cement - Started @ 10/13/2016 Type Casing Wellbore I CD5-99A Cemented String Intermediate, 15,570.6ftKB Cement Evaluation Results Sonic and SCMT Sig # 1 Description Intermediate Casing Cement Top Depth (ftKB) 13,854.0 Bottom Depth (ftKB)0 15,582.0 Pump Final... 8 P Pump Final (psi) 580.0 Fluid I Class Amount (sacks) Vol Pumped (bbl) Dens (Ib/gal) Yield (ft' /sack) Est Top (ftKB) Est Btm (ftKB) Intermediate Cement IG 7341 154.51 15.80 1.16 13,854.0 15,582.0 Stg # 2 I Description Intermediate Casing Cement Top Depth (ftKB) Bottom Depth (ftKB) 5,958.0 6,708.0 Q Pump Final... 8 P Pump Final (psi) 360.0 Fluid Class Amount (sacks) Vol Pumped (bbl) Dens (Ib/gal) I Yield (ft/sack) I Est Top (ftKB) Est Btm (ftKB) Intermediate Cement I G 13111 41.91 15.801 1.161 5,958.01 6,708.0 Head Count / Manhours Function Company Name Count Note RIG SUPERVISOR ConocoPhillips Company Ken/Rob 2 RIG SUPERVISOR SolstenXP COMPANY ENGINEER ConocoPhillips Company Joe 1 SAFETY Doyon Drilling Inc DRILL CREW Doyon Drilling Inc 24 Doyon Hands CATERING/CAMP Kuukpik Corporation 5 Cooks, housekeeping GIS MI Swaco 6 Ball Mill, 1 @ CD1 MUD ENGINEER MI Swaco 2 DIRECTIONAL Schlumberger 2 MWD Schlumberger 2 SERVICE ENGINEER FMC Corporation Wellhead Equipment Jeff 1 1 @ CD1 SERVICE ENGINEER National Oilwell OTHER Saet 1 Beacon Site Control SERVICE ENGINEER SolstenXP Kelly 1 MPD Rep CASING/TUBING Doyon Drilling Inc Puddin / Bill 2 SERVICE ENGINEER Smith Jeremy 1 Reamer hand SERVICE ENGINEER ConocoPhillips Company Solids Control Rep CEMENTING Halliburton Energy Services Inc. (HES) Steve 1 Page 3/3 Report Printed: 10/26/2016 Cement Detail Report CD5-99 String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 10/13/2016 09:00 10/13/2016 15:00 CD5-99A Comment Cemented with full returns Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing 13,854.0 15,582.0 Yes Yes Yes Cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi)Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 7 580.0 670.0 No No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Flood lines with water, test lines to 3800 psi. SLB pumped 41 bbi of 12.5 ppg Mud Push II. Drop bottom plug. SLB pumped 154.5 bbl of 15.8 ppg cement. Drop top plug. SLB kick out with 20 bbl water, rig displaced with 6892 strokes to bump plug (694 bbl). CIP @ 11:50 hrs, no losses. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 15.8 ppg Class G 13,854.0 15,582.0 734 G 154.5 intermediate cement Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.07 0.00 15.80 128.0 0.00 500.0 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type ConcentrationConc Unit label Retarder D177 0.02 gal/sx Stage # 2 Description Objective Top Depth (ftKB)Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing 5,958.0 6,708.0 Yes Yes No Cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 7 360.0 760.0 No No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) 6,707.0 PDC bit 6,711.5 63/4 Comment Peform 2nd stage cement job. Flood cement lines, pressure test to 3000 psi. SLB pumped 42 bbl 12.5 ppg MudPush Il, 65 bbl 15.8 ppg cement. Drop closing plug. SLB kick out with 20.2 bbl water, rig displaced with 2867 stks (288 bbl). Bumped plug and pressure up to 1900 psi, held 5 minutes. Bleed pressure and check floats - good. CIP @ 14:34 hrs. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 15.8 ppg Class G 5,958.0 6,708.0 311 G 41.9 intermediate cement Yield (ft'/sack) Mix H2O Ratio (gallsa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa-s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.09 0.00 15.80 162.0 0.00 500.0 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Page 1/1 Report Printed: 10/26/2016 THE STATE Alaska Oil and Gas of A Conservation Commission 1--ILASKA GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Colville River Unit, Alpine Oil Pool, CD5-99A Permit to Drill Number: 216-122 Sundry Number: 316-495 Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Cathy P. oerster Chair - DATED this 2-4day of September, 2016. RBDMS L `- SEP 2 9 2916 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 9n AAr. 95 9Rn SEP 2 7 2016 : 0G0 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program � I Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing❑ ❑ Other: 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska Inc Exploratory ❑ Development ❑✓ . Stratigraphic ❑ Service ❑ 216-122 , 3. Address: 6. API Number: P.O. Box 100360 Anchorage, AK 99510-0360 50-103-20748-01-00 7. If perforating: ,114 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? J- y3 3 Will planned perforations require a spacing exception? Yes ❑ No ❑� ✓ CRU CD5-99A 9. Property Designation (Lease Number):10. Field/Pool(s): ASRC-NPR2, ASRC-NPR4, ADL387208, ADL387209 Colville River Unit, Alpine Pool . 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 2337 2180 2337 2180 2986psi Casing Length Size MD TVD Burst Collapse Structural Conductor 80 20 116 116 Surface 2337 10-3/4" 2337 2180 5210 2470 Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): 12. Attachments: Proposal Summary ❑ Wellbore schematic ❑✓ 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development Service ❑ 14. Estimated Date for Sept. 28, 2016 15. Well Status after proposed work: Commencing Operations: OIL WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and the procedure approved David Lee (�J(% // herein will not be deviated from r �' without prior written approval. Contact C !/ ��(C Email dayid.I.leeffCOn000p fllips.com Printed Name Chi Ivord 5-61 (' Title Drilling Engineer R_� L` t— r 7% ' L. ALvC;�z' ' 2-0 / Ca> . Signature ` ` Phone Date COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test M/ Mechanical Integrity Test ❑ Location Clearance ❑ Other: f�7O%� fry f"0 35 DC?r 51 f- I-0 7,5- ev�V7frrpfr� ✓ fir v w� cot « f r t r e13 L �-c� v� GI e13 Post Initial Injection MIT Req'd? Yes ❑ No m` I Z - I) 6 Spacing Exception Required? Yes ❑ No Subsequent Form Required: f b -- RBDMS LL SEP 2 9 2016 APPROVED BY Approved by:a�COMMISSIONER THE COMMISSION Date: V `4J �`55,` f_ ' j F{ 1 J -yp� tN % \ Z Submit Form and Form 10-40 e ised 1/201 "' v a`a c t n/ISY for 1,m 1;qE date of approval. Attachments in Duplicate CD5-99Awp2l D 7.2299 0 10-3/4" x 13-1/2' a5 __.._. C30 AIpA 7-5/8" X 9-7/8" by 11 5 03 /Qannik C10 i AIb96 ( LCU UJU o , K r AIb97 i lubikt AIpC I RZ\, i t 0 0 r 0 6000 12000 18000 24000 r Measured Depth C 0° 10-3/4 x 13-1 /2' Geodetic Datum: North American Datum 1983 /J Depth Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) / o oc 0 Rig: Coyon 19 o bo 00 oJ 0 00 0 0 7-5/8" X 9-7/8" by 11 Cl) rm o0 0 0 o \ \ �2 N N N N N N 0 2500 5000 7500 10000 12500 15000 17500 20000 22500 250( Horizontal Departure Plan Summary 0 J 0 - 2340 2340 - 2500 g m60- -- - -- -�- - fl1-1II 2500 / - 3000 900 I 60 3000 3900 3900 - 4950 to �. 4950 - 6000 ,,. 6000 - 7050 30 7050 - 8100 o270 ( , ��,..•.. 90 5100 - 9150 a1 .-l�9150 - 10200 g ,,as c ( j 10200 - 12300 U I_ / 12300 - 14400 D14400 - 16500 18600 - 15600 0 4000 8000 12000 16000 20000 24000 28000 240 "' i 120 - 18600 - 20700 , /20700 SURVEY PROGRAM` 22800 Surface Location �`. / \\/ -� Depth From Depth To Survey/Plan Tool North / Y: 5965666.90 , �� 22500 -- 22900 - 100.00 500.00 CD5-99 Srvy 1 - SLB_GYD-GC-SS (Rig: CMBWC-SS East / X: 1489591.67 210 -' "- 24900 - 27000 572.96 2270.51 CD5-99 Srvy 2 - SLB MWD G R3aff-Z-SC 1� Pad Elevation: 33.90 ---- 150 1-2 _ _GMIA\}2i1§ 2360.53 2390.00 CD5-99 Srvy 3 - SLB_MWD+GMA'GWW.:R;IDB-t@jZ-SC 2390.00 4900.00 CD5-99Awp21 (Plan: CD5-99A) MWD CASING DETAILS 150 2390.00 15816.38 CD5-99Awp21 (Plan: CD5-99A)MWD+IFR-AK-CAZ-SC 15836.38 17336.38 CD5-99Awp21 (Plan: CD5-99A) MWD TVD MD Name IVII 15836.38 27000.00 CD5-99Awp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 7580.45 15816.38 7-5/8" X 9-7/8" by 11" T 7681.17 27000.00 4-1/2" x 6-3/4" Magnetic Model: BGGM2016 Magnetic Model Date: 01 -Oct -16 Magnetic Declination: 17.52° To convert a Magnetic Direction to a True Direction, Add 17.520 East SECTION DETAILS Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect Target Annotation 1 2390.00 44.18 124.40 2220.13 -482.62 450.25 0.00 0.00 637.51 2312.4 2 2440.00 42.68 124.40 2256.43 -502.05 478.62 3.00 180.00 667.98 3 3221.79 65.71 118.78 2710.96 -827.85 1017.10 3.00 -12.97 1208.44 C30 4 14429.24 65.71 118.78 7321.88 -5745.32 9970.58 0.00 0.00 9753.72 5 14842.09 80.00 121.00 7443.30 -5941,64 10311.55 3.50 8.81 10087.14 CD5-99A 80 deg pt 2860.4 6 15187.62 80.00 121.00 7503.30 -6116.90 10603.22 0.00 0.00 10378.81 7 15816.38 86.00 138.00 7580.45 -6512.64 11082.36 2.85 71.61 10953.17 C10 8 15836.38 86.00 138.00 7581.85 -6527.46 11095.71 0.00 0.00 10972.53 9 15936.66 89.51 138.00 7585.77 "6601.92 11162.75 3.50 0.0011069.75 10 16436.66 89.51 138.00 7590.05 _6973.48 11497.30 0.00 0.00 11554.88 3798.4 11 17114.16 89 51151.55 7595.90 -7525.62 11887.15 2.00 90.08 12225.40 1 24366.38 89.51 151.55 7658.45 -13901.80 15341.87 0.00 0.00 19477.13 CD5-99 02.Toe 041416 JD 4026.4 13 27000.00 89.51 151.55 7681.17 -16217.29 16596.44 0.00 0.00 22110.57 TD: 27000' MD, 7680.95' TVD K2 / Qannik Sidetrack depth 5068.5 ^50 ft below AIb97 surface casing 5915.3 AIb96 70 bik 7783 74 AIpA signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position and I approve the scan and Ilision avoidance plan as set out in the audit pack. I approve it as the basis for the final well Dan and wells drawin s. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. Prepared by: Checked by: Accepted by: Approved by: Brij Potnis Nate Beck Ifeanyi Ifesie CD5-99Awp2l Section View -2500 10-3/4" x 13-1/2" A 0- r C30 10p0 C10 �pa K3 K2 / Qannik o 0 2500 m®oo ,o oo AIb97 C OOo o coon 0 - a Q 0 ,/' AIb96 7-5/8" X 9-7/8" by 11" o 000 `b � ,eso 00 o U v 5000 �O' X00 � 0 IZ N L O o 0 0 �o �o 0 0 0,' 0 0 0 0 0 0 0 � 0 0 0 0 0 0 0`, o o ~ i 00 _o N N 633 N N N ` O 7500 - - - N HRZ Kalubik UJU AlpA LCU AlpC 10000- 4-1/2" x 6-3/4" 0 2500 5000 7500 10000 12500 15000 17500 20000 22500 Vertical Section at 152.00° (2500 usft/in) CD5-99Awp2l Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. 0 o0 10-3/4" x 13-1/2" moo -3000 00 �o CD5-99A 80 deg t 00 Coo M5 -99A Csg t ^000 _6000- 6000 o 0 o --: o ,-- 7-5/8" X 9-7/8" by 11" z-9000 CD5-99A Polygon 092116 P 0 U) -12000 g�P�p2� MD5-99 02.Toe 041416 JD -15000 4-1/2" x 6-3/4"----- -3000 0 3000 6000 9000 12000 15000 18000 21000 West( -)/East(+) (3000 usft/in) CD5-99Awp2l Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. -4000 Ooo CD5-99A 80 deg t -5000 0 5 Q5AZ 7-5/8" X 9-7/8" by 11 " CD5-99A Csg t 6000 � - - ' CD5-99A Polygon 092116 g tf-7000 0 Z 0 CO -8000 -9000 2� �gP�9 05� -10000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 West( -)/East(+) (1000 usft/in) ConocoPh ill ips(Alaska) Inc. -WNS Western North Slope C135 Alpine West Pad Rig: CD5-99 Plan: C136 -99A Plan: CD5-99Awp21 Standard Proposal Report 26 September, 2016 Database: EDM Production Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99A Design: CD5-99Awp21 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coycn 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Site CD5 Alpine West Pad i Site Position: Northing: 5,965,528.00usft Latitude: 70° 18'47.778 N From: Map Easting: 1,489,252.00 usft Longitude: 151° 13' 30.647 W Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Grid Convergence: -1.15 ° J Well Rig: CD5-99 Well Position +N/ -S 0.00 usft Northing: 5,965,666.90 usft Latitude: 70° 18'49.211 N +E/ -W 0.00 usft Easting: 1,489,591.67 usft Longitude: 151° 13'20.821 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft Wellbore Plan: CD5-99A Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGG M2016 10/1/2016 17.52 80.81 57,510 Design CD5-99Awp21 Audit Notes: Version: Phase: PLAN Tie On Depth: 2,390.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) TVD 36.55 0.00 0.00 152.00 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/ -S +E/ -W Rate Rate Rate Tool Face (usft) (°) (°) (usft) usft (usft) (usft) (°/100usft) (°/100usft) (°/100usft) (°) 2,390.00 44.18 124.40 2,220.13 2,149.68 -482.62 450.25 0.00 0.00 0.00 0.00 2,440.00 42.68 124.40 2,256.43 2,185.98 -502.05 478.62 3.00 -3.00 0.00 180.00 3,221.79 65.71 118.78 2,710.96 2,640.51 -827,85 1,017.10 3.00 2.94 -0.72 -12.97 14,429.24 65.71 118.78 7,321.88 7,251.43 -5,745.32 9,970.58 0.00 0.00 0.00 0.00 14,842.09 80.00 121.00 7,443.30 7,372.85 -5,941.64 10,311.55 3.50 3.46 0.54 8.81 15,187.62 80.00 121.00 7,503.30 7,432.85 -6,116.90 10,603.22 0.00 0.00 0.00 0.00 15,816.38 86.00 138.00 7,580.45 7,510.00 -6,512.64 11,082.36 2.85 0.95 2.70 71.61 15,836.38 86.00 138.00 7,581.85 7,511.40 -6,527.46 11,095.71 0.00 0.00 0.00 0.00 15,936.66 89.51 138.00 7,585.77 7,515.32 -6,601.92 11,162.75 3.50 3.50 0.00 0.00 16,436.66 89.51 138.00 7,590.05 7,519.60 -6,973.48 11,497.30 0.00 0.00 0.00 0.00 17,114.16 89.51 151.55 7,595.90 7,525.45 -7,525.62 11,887.15 2.00 0.00 2.00 90.08 24,366.38 89.51 151.55 7,658.45 7,588.00 -13,901.80 15,341.87 0.00 0.00 0.00 0.00 27,000.00 89.51 151.55 7,681.17 7,610.72 -16,217.29 16,596.44 0.00 0.00 0.00 0.00 9/26/2016 11:39:42AM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Depth Inclination Design: CD5-99Awp21 TVDss +N/ -S Planned Survey i Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 2,149.68 2,390.00 44.18 124.40 2,220.13 27149.68 -482.62 450.25 5,965,175.36 1,490,032.11 3.16 637.51 Start DLS 3.00 TFO 180.00 2,400.00 43.88 124.40 2,227.31 2,156.86 -486.55 455.99 5,965,171.32 1,490,037.76 3.00 643.67 j 2,440.00 42.68 124.40 2,256.43 2,185.98 -502.05 478.62 5,965,155.38 1,490,060.07 3.00 667.98 Start DLS 3.00 TFO -12.97 ! 2,500.00 44.44 123.82 2,299.91 2,229.46 -525.23 512.85 5,965,131.51 1,490,093.83 3.00 704.52 2,517.64 44.96 123.66 2,312.45 2,242.00 -532.13 523.17 5,965,124.41 1,490,104.01 3.00 715.45 C30 2,600.00 47.37 122.94 2,369.48 2,299.03 -564.73 572.82 5,965,090.82 1,490,152.99 3.00 767.55 2,700.00 50.31 122.13 2,435.29 2,364.84 -605.21 636.29 5,965,049.08 1,490,215.63 3.00 833.09 2,800.00 53.25 121.39 2,497.15 2,426.70 -646.55 703.09 5,965,006.40 1,490,281.58 3.00 900.95 2,900.00 56.20 120.71 2,554.89 2,484.44 -688.65 773.03 5,964,962.91 1,490,350.65 3.00 970.96 3,000.00 59.15 120.07 2,608.36 2,537.91 -731.38 845.92 5,964,918.73 1,490,422.67 3.00 1,042.91 3,100.00 62.11 119.47 2,657.40 2,586.95 -774.64 921.56 5,964,873.97 1,490,497.42 3.00 1,116.61 3,200.00 65.06 118.90 2,701.89 2,631.44 -818.29 999.75 5,964,828.75 1,490;574.70 3.00 1,191.86 3,221.79 65.71 118.78 2,710.96 2,640.51 -827.85 1,017.10 5,964,818.85 1,490,591.86 3.00 1,208.44 Start 11207.45 hold at 3221.79 MD 3,300.00 65.71 118.78 2,743.14 2,672.69 -862.16 1,079.58 5,964,783.29 1,490,653.64 0.00 1,268.08 3,400.00 65.71 118.78 2,784.28 2,713.83 -906.04 1,159.47 5,964,737.82 1,490,732.62 0.00 1,344.33 3,500.00 65.71 118.78 2,825.42 2,754.97 -949.92 1,239.36 5,964,692.35 1,490,811.61 0.00 1,420.57 3,585.14 65.71 118.78 2,860.45 2,790.00 -987.27 1,307.38 5,964,653.64 1,490,878.85 0.00 1,485.49 C10 3,600.00 65.71 118.78 2,866.56 2,796.11 -993.79 1,319.25 5,964,646.88 1,490,890.59 0.00 1,496.82 3,700.00 65.71 118.78 2,907.71 2,837.26 -1,037.67 1,399.14 5,964,601.41 1,490,969.58 0.00 1,573.06 3,800.00 65.71 118.78 2,948.85 2,878.40 -1,081.55 1,479.02 5,964,555.94 1,491,048.56 0.00 1,649.31 3,900.00 65.71 118.78 2,989.99 2,919.54 -1,125.43 1,558.91 5,964,510.47 1,491,127.55 0.00 1,725.56 4,000.00 65.71 118.78 3,031.13 2,960.68 -1,169.30 1,638.80 5,964,465.00 1,491,206.53 0.00 1,801.80 4,100.00 65.71 118.78 3,072.27 3,001.82 -1,213.18 1,718.69 5,964,419.53 1,491,285.52 0.00 1,878.05 4,200.00 65.71 118.78 3,113.41 3,042.96 -1,257.06 1,798.58 5,964,374.06 1,491,364.50 0.00 1,954.30 4,300.00 65.71 118.78 3,154.55 3,084.10 -1,300.93 1,878.47 5,964,328.59 1,491,443.49 0.00 2,030.54 4,400.00 65.71 118.78 3,195.70 3,125.25 -1,344.81 1,958.36 5,964,283.12 1,491,522.47 0.00 2,106.79 4,500.00 65.71 118.78 3,236.84 3,166.39 -1,388.69 2,038.24 5,964,237.66 1,491,601.46 0.00 2,183.04 4,600.00 65.71 118.78 3,277.98 3,207.53 -1,432.56 2,118.13 5,964,192.19 1,491,680.44 0.00 2,259.28 4,700.00 65.71 118.78 3,319.12 3,248.67 -1,476.44 2,198.02 5,964,146.72 1,491,759.43 0.00 2,335.53 4,800.00 65.71 118.78 3,360.26 3,289.81 -1,520.32 2,277.91 5,964,101.25 1,491,838.41 0.00 2,411.77 4,900.00 65.71 118.78 3,401.40 3,330.95 -1,564.19 2,357.80 5,964,055.78 1,491,917.40 0.00 2,488.02 5,000.00 65.71 118.78 3,442.55 3,372.10 -1,608.07 2,437.69 5,964,010.31 1,491,996.38 0.00 2,564.27 5,100.00 65.71 118.78 3,483.69 3,413.24 -1,651.95 2,517.58 5,963,964.84 1,492,075.37 0.00 2,640.51 5,200.00 65.71 118.78 3,524.83 3,454.38 -1,695.82 2,597.47 5,963,919.37 1,492,154.36 0.00 2,716.76 5,300.00 65.71 118.78 3,565.97 3,495.52 -1,739.70 2,677.35 5,963,873.90 1,492,233.34 0.00 2,793.01 5,400.00 65.71 118.78 3,607.11 3,536.66 -1,783.58 2,757.24 5,963,828.43 1,492,312.33 0.00 2,869.25 5,500.00 65.71 118.78 3,648.25 3,577.80 -1,827.45 2,837.13 5,963,782.96 1,492,391.31 0.00 2,945.50 5,600.00 65.71 118.78 3,689.40 3,618.95 -1,871.33 2,917.02 5,963,737.49 1,492,470.30 0.00 3,021.75 5,700.00 65.71 118.78 3,730.54 3,660.09 -1,915.21 2,996.91 5,963,692.02 1,492,549.28 0.00 3,097.99 5,800.00 65.71 118.78 3,771.68 3,701.23 -1,959.09 3,076.80 5,963,646.55 1,492,628.27 0.00 3,174.24 9/26/2016 11:39:42AM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Design: CD5-99Awp21 Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 3,728.00 5,865.07 65.71 118.78 3,798.45 3,728.00 -1,987.64 3,128.78 5,963,616.96 1,492,679.66 0.00 31223.85 K3 5,900.00 65.71 118.78 3,812.82 3,742.37 -2,002.96 3,156.69 5,963,601.08 1,492,707.25 0.00 3,250.48 6,000.00 65.71 118.78 3,853.96 3,783.51 -2,046.84 3,236.57 5,963,555.61 1,492,786.24 0.00 3,326.73 6,100.00 65.71 118.78 3,895.10 3,824.65 -2,090.72 3,316.46 5,963,510.14 1,492,865.22 0.00 3,402.98 6,200.00 65.71 118.78 3,936.24 3,865.79 -2,134.59 3,396.35 5,963,464.67 1,492,944.21 0.00 3,479.22 6,300.00 65.71 118.78 3,977.39 3,906.94 2,178.47 3,476.24 5,963,419.21 1,493,023.19 0.00 3,555.47 i 6,400.00 65.71 118.78 4,018.53 3,948.08 -2,222.35 3,556.13 5,963,373.74 1,493,102.18 0.00 3,631.72 6,419.26 65.71 118.78 4,026.45 3,956.00 -2,230.80 3,571.51 5,963,364.98 1,493,117.39 0.00 3,646.40 K2 / Qannik 6,500.00 65.71 118.78 4,059.67 3,989.22 -2,266.22 3,636.02 5,963,328.27 1,493,181.16 0.00 3,707.96 6,600.00 65.71 118.78 4,100.81 4,030.36 -2,310.10 3,715.91 5,963,282.80 1,493,260.15 0.00 3,784.21 6,700.00 65.71 118.78 4,141.95 4,071.50 -2,353.98 3,795.79 5,963,237.33 1,493,339.13 0.00 3,860.46 6,800.00 65.71 118.78 4,183.09 4,112.64 -2,397.85 3,875.68 5,963,191.86 1,493,418.12 0.00 3,936.70 j 6,900.00 65.71 118.78 4,224.24 4,153.79 -2,441.73 3,955.57 5,963,146.39 1,493,497.10 0.00 4,012.95 7,000.00 65.71 118.78 4,265.38 4,194.93 -2,485.61 4,035.46 5,963,100.92 1,493,576.09 0.00 4,089.20 7,100.00 65.71 118.78 4,306.52 4,236.07 -2,529.48 4,115.35 5,963,055.45 1,493,655.07 0.00 4,165.44 7,200.00 65.71 118.78 4,347.66 4,277.21 -2,573.36 4,195.24 5,963,009.98 1,493,734.06 0.00 4,241.69 7,300.00 65.71 118.78 4,388.80 4,318.35 -2,617.24 4,275.13 5,962,964.51 1,493,813.05 0.00 4,317.93 7,400.00 65.71 118.78 4,429.94 4,359.49 -2,661.12 4,355.01 5,962,919.04 1,493,892.03 0.00 4,394.18 j 7,500.00 65.71 118.78 4,471.09 4,400.64 -2,704.99 4,434.90 5,962,873.57 1,493,971.02 0.00 4,470.43 7,600.00 65.71 118.78 4,512.23 4,441.78 -2,748.87 4,514.79 5,962,828.10 1,494,050.00 0.00 4,546.67 7,700.00 65.71 118.78 4,553.37 4,482.92 -2,792.75 4,594.68 5,962,782.63 1,494,128.99 0.00 4,622.92 7,800.00 65.71 118.78 4,594.51 4,524.06 -2,836.62 4,674.57 5,962,737.16 1,494,207.97 0.00 4,699.17 7,900.00 65.71 118.78 4,635.65 4,565.20 -2,880.50 4,754.46 5,962,691.69 1,494,286.96 0.00 4,775.41 8,000.00 65.71 118.78 4,676.79 4,606.34 -2,924.38 4,834.35 5,962,646.23 1,494,365.94 0.00 4,851.66 8,100.00 65.71 118.78 4,717.93 4,647.48 -2,968.25 4,914.24 5,962,600.76 1,494,444.93 0.00 4,927.91 8,200.00 65.71 118.78 4,759.08 4,688.63 -3,012.13 4,994.12 5,962,555.29 1,494,523.91 0.00 5,004.15 8,300.00 65.71 118.78 4,800.22 4,729.77 -3,056.01 5,074.01 5,962,509.82 1,494,602.90 0.00 5,080.40 8,400.00 65.71 118.78 4,841.36 4,770.91 -3,099.88 5,153.90 5,962,464.35 1,494,681.88 0.00 5,156.64 8,500.00 65.71 118.78 4,882.50 4,812.05 -3,143.76 5,233.79 5,962,418.88 1,494,760.87 0.00 5,232.89 8,600.00 65.71 118.78 4,923.64 4,853.19 -3,187.64 5,313.68 5,962,373.41 1,494,839.85 0.00 5,309.14 8,700.00 65.71 118.78 4,964.78 4,894.33 -3,231.51 5,393.57 5,962,327.94 1,494,918.84 0.00 5,385.38 8,800.00 65.71 118.78 5,005.93 4,935.48 -3,275.39 5,473.46 5,962,282.47 1,494,997.82 0.00 5,461.63 8,900.00 65.71 118.78 5,047.07 4,976.62 -3,319.27 5,553.34 5,962,237.00 1,495,076.81 0.00 5,537.88 8,951.97 65.71 118.78 5,068.45 4,998.00 -3,342.07 5,594.87 5,962,213.37 1,495,117.86 0.00 5,577.50 Alb97 9,000.00 65.71 118.78 5,088.21 5,017.76 -3,363.14 5,633.23 5,962,191.53 1,495,155.79 0.00 5,614.12 9,100.00 65.71 118.78 5,129.35 5,058.90 -3,407.02 5,713.12 5,962,146.06 1,495,234.78 0.00 5,690.37 9,200.00 65.71 118.78 5,170.49 5,100.04 -3,450.90 5,793.01 5,962,100.59 1,495,313.76 0.00 5,766.62 9,300.00 65.71 118.78 5,211.63 5,141.18 -3,494.78 5,872.90 5,962,055.12 1,495,392.75 0.00 5,842.86 9,400.00 65.71 118.78 5,252.78 5,182.33 -3,538.65 51952.79 5,962,009.65 1,495,471.74 0.00 5,919.11 9,500.00 65.71 118.78 5,293.92 5,223.47 -3,582.53 6,032.68 5,961,964.18 1,495,550.72 0.00 5,995.36 9,600.00 65.71 118.78 5,335.06 5,264.61 -3,626.41 6,112.56 5,961,918.71 1,495,629.71 0.00 6,071.60 9,700.00 65.71 118.78 5,376.20 5,305.75 -3,670.28 6,192.45 5,961,873.24 1,495,708.69 0.00 6,147.85 9/26/2016 11:39:42AM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @) 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Depth Inclination Design: C05-99Awp21 TVDss +N/ -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 5,346.89 9,800.00 65.71 118.78 5,417.34 5,346.89 -3,714.16 6,272.34 5,961,827.78 1,495,787.68 0.00 6,224.09 9,900.00 65.71 118.78 5,458.48 5,388.03 -3,758.04 6,352.23 5,961,782.31 1,495,866.66 0.00 6,300.34 10,000.00 65.71 118.78 5,499.62 5,429.17 -3,801.91 6,432.12 5,961,736.84 1,495,945.65 0.00 6,376.59 10,100.00 65.71 118.78 5,540.77 5,470.32 -3,845.79 6,512.01 5,961,691.37 1,496,024.63 0.00 6,452.83 10,200.00 65.71 118.78 5,581.91 5,511.46 -3,889.67 6,591.90 5,961,645.90 1,496,103.62 0.00 6,529.08 10,300.00 65.71 118.78 5,623.05 5,552.60 -3,933.54 6,671.79 5,961,600.43 1,496,182.60 0.00 6,605.33 10,400.00 65.71 118.78 5,664.19 5,593.74 -3,977.42 6,751.67 5,961,554.96 1,496,261.59 0.00 6,681.57 10,500.00 65.71 118.78 5,705.33 5,634.88 -4,021.30 6,831.56 5,961,509.49 1,496,340.57 0.00 6,757.82 10,600.00 65.71 118.78 5,746.47 5,676.02 -4,065.17 6,911.45 5,961,464.02 1,496,419.56 0.00 6,834.07 10,700.00 65.71 118.78 5,787.62 5,717.17 -4,109.05 6,991.34 5,961,418.55 1,496,498.54 0.00 6,910.31 10,800.00 65.71 118.78 5,828.76 5,758.31 -4,152.93 7,071.23 5,961,373.08 1,496,577.53 0.00 6,986.56 10,900.00 65.71 118.78 5,869.90 5,799.45 -4,196.80 7,151.12 5,961,327.61 1,496,656.51 0.00 7,062.80 11,000.00 65.71 118.78 5,911.04 5,840.59 -4,240.68 7,231.01 5,961,282.14 1,496,735.50 0.00 7,139.05 11,017.67 65.71 118.78 5,918.31 5,847.86 -4,248.43 7,245.12 5,961,274.11 1,496,749.46 0.00 7,152.52 AIb96 11,100.00 65.71 118.78 5,952.18 5,881.73 -4,284.56 7,310.89 5,961,236.67 1,496,814.48 0.00 7,215.30 11,200.00 65.71 118.78 5,993.32 5,922.87 -4,328.44 7,390.78 5,961,191.20 1,496,893.47 0.00 7,291.54 11,300.00 65.71 118.78 6,034.47 5,964.02 -4,372.31 7,470.67 5,961,145.73 1,496,972.46 0.00 7,367.79 11,400.00 65.71 118.78 6,075.61 6,005.16 -4,416.19 7,550.56 5,961,100.26 1,497,051.44 0.00 7,444.04 11,500.00 65.71 118.78 6,116.75 6,046.30 -4,460.07 7,630.45 5,961,054.80 1,497,130.43 0.00 7,520.28 11,600.00 65.71 118.78 6,157.89 6,087.44 -4,503.94 7,710.34 5,961,009.33 1,497,209.41 0.00 7,596.53 11,700.00 65.71 118.78 6,199.03 6,128.58 -4,547.82 7,790.23 5,960,963.86 1,497,288.40 0.00 7,672.78 11,800.00 65.71 118.78 6,240.17 6,169.72 -4,591.70 7,870.11 5,960,918.39 1,497,367.38 0.00 7,749.02 11,900.00 65.71 118.78 6,281.31 6,210.86 -4,635.57 7,950.00 5,960,872.92 1,497,446.37 0.00 7,825.27 12,000.00 65.71 118.78 6,322.46 6,252.01 -4,679.45 8,029.89 5,960,827.45 1,497,525.35 0.00 7,901.52 12,100.00 65.71 118.78 6,363.60 6,293.15 -4,723.33 8,109.78 5,960,781.98 1,497,604.34 0.00 7,977.76 12,200.00 65.71 118.78 6,404.74 6,334.29 -4,767.20 8,189.67 5,960,736.51 1,497,683.32 0.00 8,054.01 12,300.00 65.71 118.78 6,445.88 6,375.43 -4,811.08 8,269.56 5,960,691.04 1,497,762.31 0.00 8,130.25 12,400.00 65.71 118.78 6,487.02 6,416.57 -4,854.96 8,349.45 5,960,645.57 1,497,841.29 0.00 8,206.50 12,500.00 65.71 118.78 6,528.16 6,457.71 -4,898.83 8,429.33 5,960,600.10 1,497,920.28 0.00 8,282.75 12,600.00 65.71 118.78 6,569.31 6,498.86 -4,942.71 8,509.22 5,960,554.63 1,497,999.26 0.00 8,358.99 12,700.00 65.71 118.78 6,610.45 6,540.00 -4,986.59 8,589.11 5,960,509.16 1,498,078.25 0.00 8,435.24 12,800.00 65.71 118.78 6,651.59 6,581.14 -5,030.46 8,669.00 5,960,463.69 1,498,157.23 0.00 8,511.49 12,900.00 65.71 118.78 6,692.73 6,622.28 -5,074.34 8,748.89 5,960,418.22 1,498,236.22 0.00 8,587.73 13,000.00 65.71 118.78 6,733.87 6,663.42 -5,118.22 8,828.78 5,960,372.75 1,498,315.20 0.00 8,663.98 13,100.00 65.71 118.78 6,775.01 6,704.56 -5,162.10 8,908.67 5,960,327.28 1,498,394.19 0.00 8,740.23 13,200.00 65.71 118.78 6,816.16 6,745.71 -5,205.97 8,988.56 5,960,281.81 1,498,473.17 0.00 8,816.47 13,300.00 65.71 118.78 6,857.30 6,786.85 -5,249.85 9,068.44 5,960,236.35 1,498,552.16 0.00 8,892.72 13,400.00 65.71 118.78 6,898.44 6,827.99 -5,293.73 9,148.33 5,960,190.88 1,498,631.15 0.00 8,968.96 13,500.00 65.71 118.78 6,939.58 6,869.13 -5,337.60 9,228.22 5,960,145.41 1,498,710.13 0.00 9,045.21 13,600.00 65.71 118.78 6,980.72 6,910.27 -5,381.48 9,308.11 5,960,099.94 1,498,789.12 0.00 9,121.46 13,688.23 65.71 118.78 7,017.02 6,946.57 -5,420.19 9,378.59 5,960,059.82 1,498,858.80 0.00 9,188.73 HRZ 13,700.00 65.71 118.78 7,021.86 6,951.41 -5,425.36 9,388.00 5,960,054.47 1,498,868.10 0.00 9,197.70 13,800.00 65.71 118.78 7,063.00 6,992.55 -5,469.23 9,467.89 5,960,009.00 1,498,947.09 0.00 9,273.95 9/26/2016 11:39:42AM Page 5 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Depth Inclination Azimuth Design: CD5-99Awp21 +N/ -S +E/ -W Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 7,033.70 13,900.00 65.71 118.78 7,104.15 7,033.70 -5,513.11 9,547.78 5,959,963.53 1,499,026.07 0.00 9,350.20 14,000.00 65.71 118.78 7,145.29 7,074.84 -5,556.99 9,627.66 5,959,918.06 1,499,105.06 0.00 9,426.44 14,100.00 65.71 118.78 7,186.43 7,115.98 -5,600.86 9,707.55 5,959,872.59 1,499,184.04 0.00 9,502.69 14,118.38 65.71 118.78 7,193.99 7,123.54 -5,608.93 9,722.23 5,959,864.23 1,499,198.56 0.00 9,516.70 i Kalubik 14,200.00 65.71 118.78 7,227.57 7,157.12 -5,644.74 9,787.44 5,959,827.12 1,499,263.03 0.00 9,578.94 14,300.00 65.71 118.78 7,268.71 7,198.26 -5,688.62 9,867.33 5,959,781.65 1,499,342.01 0.00 9,655.18 j 14,400.00 65.71 118.78 7,309.85 7,239.40 -5,732.49 9,947.22 5;959,736.18 1,499,421.00 0.00 9,731.43 14,415.13 65.71 118.78 7,316.08 7,245.63 -5,739.13 9,959.31 5,959,729.30 1,499,432.95 0.00 9,742.97 LCU 14,429.24 65.71 118.78 7,321.88 7,251.43 -5,745.32 9,970.58 5,959,722.89 1,499,444.09 0.00 9,753.72 Start DLS 3.50 TFO 8.81 14,500.00 68.15 119.19 7,349.61 7,279.16 -5,776.87 10,027.52 5,959,690.21 1,499,500.39 3.50 9,808.31 14,600.00 71.62 119.74 7,384.00 7,313.55 -5,823.05 10,109.26 5,959,642.40 1,499,581.18 3.50 9,887.46 14,700.00 75.08 120.27 7,412.65 7,342.20 -5,870.95 10,192.21 5,959,592.84 1,499,663.14 3.50 9,968.70 14,800.00 78.54 120.79 7,435.46 7,365.01 -5,920.41 10,276.06 5,959,541.72 1,499,745.98 3.50 10,051.73 14,842.09 80.00 121.00 7,443.30 7,372.85 -5,941.64 10,311.55 5,959,519.78 1,499,781.03 3.50 10,087.14 Start 345.53 hold at 14842.09 MD - CD5-99A 80 deg pt 14,900.00 80.00 121.00 7,453.36 7,382.91 -5,971.01 10,360.43 5,959,489.43 1,499,829.31 0.00 10,136.02 14,978.34 80.00 121.00 7,466.96 7,396.51 -6,010.75 10,426.57 5,959,448.38 1,499,894.62 0.00 10,202.15 AlpC 14,998.33 80.00 121.00 7,470.43 7,399.98 -6,020.88 10,443.44 5,959,437.90 1,499,911.28 0.00 10,219.02 UJU 15,000.00 80.00 121.00 7,470.72 7,400.27 -6,021.73 10,444.85 5,959,437.03 1,499,912.68 0.00 10,220.44 15,100.00 80.00 121.00 7,488.09 7,417.64 -6,072.46 10,529.26 5,959,384.62 1,499,996.05 0.00 10,304.85 15,187.62 80.00 121.00 7,503.30 7,432.85 -6,116.90 10,603.22 5,959,338.71 1,500,069.10 0.00 10,378.81 Start DLS 2.85 TFO 71.61 15,200.00 80.11 121.34 7,505.44 7,434.99 -6,123.21 10,613.66 5,959,332.19 1,500,079.41 2.85 10,389.28 15,300.00 81.02 124.07 7,521.83 7,451.38 -6,176.51 10,696.66 5,959,277.24 1,500,161.31 2.85 10,475.31 15,400.00 81.95 126.79 7,536.63 7,466.18 -6,233.84 10,777.23 5,959,218.30 1,500,240.71 2.85 10,563.76 15,500.00 82.90 129.50 7,549.81 7,479.36 -6,295.07 10,855.18 5,959,155.53 1,500,317.40 2.85 10,654.41 15,600.00 83.87 132.20 7,561.33 7,490.88 -6,360.03 10,930.31 5,959,089.07 1,500,391.21 2.85 10,747.04 15,700.00 84.85 134.88 7,571.16 7,500.71 -6,428.58 11,002.43 5,959,019.09 1,500,461.94 2.85 10,841.43 15,745.36 85.30 136.10 7,575.06 7,504.61 -6,460.81 11,034.11 5;958,986.23 1,500,492.96 2.85 10,884.76 AlpA 15,800.00 85.84 137.56 7,579.28 7,508.83 -6,500.54 11,071.38 5,958,945.77 1,500,529.42 2.85 10,937.34 15,816.38 86.00 138.00 7,580.45 7,510.00 -6,512.64 11,082.36 5,958,933.45 1,500,540.16 2.85 10,953.17 Start 20.00 hold at 15816.38 MD - 7-5/8" X 9-7/8" by 11" 15,836.37 86.00 138.00 7,581.85 7,511.40 -6,527.46 11,095.71 5,958,918.36 1,500,553.20 0.00 10,972.53 Start Build 3.50 - CDS-99A Csg Pt 15,900.00 88.23 138.00 7,585.05 7,514.60 -6,574.68 11,138.22 5,958,870.30 1,500,594.76 3.50 11,034.18 15,936.66 89.51 138.00 7,585.77 7,515.32 -6,601.92 11,162.75 5,958,842.58 1,500,618.73 3.50 11,069.75 Start 500.00 hold at 15936.66 MD 16,000.00 89.51 138.00 7,586.31 7,515.86 -6,648.99 11,205.13 5,958,794.67 1,500,660.15 0.00 11,131.20 9/26/2016 11:39:42AM Page 6 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: Conoco Phillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Vertical Design: CD5-99Awp21 Map i Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) V) (1) (usft) usft (usft) (usft) (usft) (usft) 7,516.09 16,025.92 89.51 138.00 7,586.54 7,516.09 -6,668.25 11,222.47 5,958,775.07 1,500,677.11 0.00 11,156.35 CD5-99 01.Heel 091616 JD 16,028.49 89.51 138.00 7,586.56 7,516.11 -6,670.16 11,224.19 5,958,773.12 1,500,678.79 0.00 11,158.84 CDS-99A Polygon 092116 BP 16,100.00 89.51 138.00 7,587.17 7,516.72 -6,723.30 11,272.04 5,958,719.04 1,500.725.55 0.00 11,228.23 16,200.00 89.51 138.00 7,588.03 7,517.58 -6,797.61 11,338.95 5,958,643.40 1,500,790.95 0.00 11,325.25 16,300.00 89.51 138.00 7,588.88 7,518.43 -6,871.93 11,405.86 5,958,567.77 1,500,856.35 0.00 11,422.28 16,400.00 89.51 138.00 7,589.74 7,519.29 -6,946.24 11,472.77 5,958,492.13 1,500,921.75 0.00 11,519.30 16,436.66 I 89.51 138.00 7,590.05 7,519.60 -6,973.48 11,497.30 5,958,464.40 1,500,945.73 0.00 11,554.88 Start DLS 2.00 TFO 90.08 16,500.00 89.51 139.27 7,590.59 7,520.14 -7,021.01 11,539.16 5,958,416.04 1,500.986.62 2.00 11,616.49 16,600.00 89.51 141.27 7,591.45 7,521.00 -7,097.91 11,603.08 5,958,337.88 1,501,048.97 2.00 11,714.40 16,700.00 89.51 143.27 7,592.31 7,521.86 -7,176.99 11,664.27 5,958,257.59 1,501,108.56 2.00 11,812.95 16,800.00 89.50 145.27 7,593.18 7,522.73 -7,258.16 11,722.66 5,958,175.28 1,501,165.31 2.00 11,912.03 16,900.00 89.50 147.27 7,594.04 7,523.59 -7,341.31 11,778.19 5,958,091.03 1,501,219.15 2.00 12,011.52 i 17,000.00 89.50 149.27 7,594.91 7,524.46 -7,426.36 11,830.78 5,958,004.95 1,501,270.02 2.00 12,111.30 17,100.00 89.51 151.27 7,595.77 7,525.32 -7,513.18 11,880.37 5,957,917.15 1,501,317.85 2.00 12,211.25 17,114.16 89.51 151.55 7,595.90 7,525.45 -7,525.62 11,887.15 5,957,904.59 1,501,324.38 2.00 12,225.40 Start 7252.22 hold at 17114.16 MD 17,200.00 89.51 151.55 7,596.64 7,526.19 -7,601.09 11,928.04 5,957,828.32 1,501,363.74 0.00 12,311.24 17,300.00 89.51 151.55 7,597.50 7,527.05 -7,689.01 11,975.68 5,957,739.46 1,501,409.60 0.00 12,411.23 17,400.00 89.51 151.55 7,598.36 7,527.91 -7,776.93 12,023.32 5,957,650.61 1,501,455.46 0.00 12,511.23 17,500.00 89.51 151.55 7,599.22 7,528.77 -7,864.85 12,070.95 5,957,561.76 1,501,501.31 0.00 12,611.22 17,600.00 89.51 151.55 7,600.09 7,529.64 -7,952.77 12,118.59 5,957,472.90 1,501,547.17 0.00 12,711.21 17,700.00 89.51 151.55 7,600.95 7,530.50 -8,040.69 12,166.23 5,957,384.05 1,501,593.03 0.00 12,811.21 17,800.00 89.51 151.55 7,601.81 7,531.36 -8,128.61 12,213.86 5,957,295.20 1,501,638.89 0.00 12,911.20 17,900.00 89.51 151.55 7,602.67 7,532.22 -8,216.53 12,261.50 5,957,206.34 1,501,684.74 0.00 13,011.19 18,000.00 89.51 151.55 7,603.54 7,533.09 -8,304.45 12,309.14 5,957,117.49 1,501,730.60 0.00 13,111.18 18,100.00 89.51 151.55 7,604.40 7,533.95 -8,392.37 12,356.77 5,957,028.64 1,501,776.46 0.00 13,211.18 18,200.00 89.51 151.55 7,605.26 7,534.81 -8,480.29 12,404.41 5,956,939.79 1,501,822.32 0.00 13,311.17 18,300.00 89.51 151.55 7,606.12 7,535.67 -8,568.21 12,452.05 5,956,850.93 1,501,868.17 0.00 13,411.16 18,400.00 89.51 151.55 7,606.99 7,536.54 -8,656.13 12,499.68 5,956,762.08 1,501,914.03 0.00 13,511.16 18,500.00 89.51 151.55 7,607.85 7,537.40 -8,744.05 12,547.32 5,956,673.23 1,501,959.89 0.00 13,611.15 18,600.00 89.51 151.55 7,608.71 7,538.26 -8,831.97 12,594.96 5,956,584.37 1,502,005.75 0.00 13,711.14 18,700.00 89.51 151.55 7,609.57 7,539.12 -8,919.89 12,642.59 5,956,495.52 1,502,051.60 0.00 13,811.14 18,800.00 89.51 151.55 7,610.44 7,539.99 -9,007.81 12,690.23 5,956,406.67 1,502,097.46 0.00 13,911.13 18,900.00 89.51 151.55 7,611.30 7,540.85 -9,095.74 12,737.87 5,956,317.81 1,502,143.32 0.00 14,011.12 19,000.00 89.51 151.55 7,612.16 7,541.71 -9,183.66 12,785.50 5,956,228.96 1,502,189.18 0.00 14,111.12 19,100.00 89.51 151.55 7,613.02 7,542.57 -9,271.58 12,833.14 5,956,140.11 1,502,235.03 0.00 14,211.11 19,200.00 89.51 151.55 7,613.89 7,543.44 -9,359.50 12,880.78 5,956,051.26 1,502,280.89 0.00 14,311.10 19,300.00 89.51 151.55 7,614.75 7,544.30 -9,447.42 12,928.41 5,955,962.40 1,502,326.75 0.00 14,411.10 19,400.00 89.51 151.55 71615.61 7,545.16 -9,535.34 12,976.05 5,955,873.55 1,502,372.61 0.00 14,511.09 19,500.00 89.51 151.55 7,616.47 7,546.02 -9,623.26 13,023.69 5,955,784.70 1,502,418.46 0.00 14,611.08 19,600.00 89.51 151.55 7,617.34 7,546.89 -9,711.18 13,071.32 5,955,695.84 1,502,464.32 0.00 14,711.08 19,700.00 89.51 151.55 7,618.20 7,547.75 -9,799.10 13,118.96 5,955,606.99 1,502,510.18 0.00 14,811.07 9/26/2016 11:39:42AM Page 7 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: C05-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Depth Inclination Design: CD5-99Awp21 TVDss +N/ -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 7,648.61 19,800.00 89.51 151.55 7,619.06 7,548.61 -9,887.02 13,166.60 5,955,518.14 1,502,556.04 0.00 14,911.06 19,900.00 89.51 151.55 7,619.92 7,549.47 -9,974.94 13,214.23 5,955,429.28 1,502,601.90 0.00 15,011.06 20,000.00 89.51 151.55 7,620.79 7,550.34 -10,062.86 13,261.87 5,955,340.43 1,502,647.75 0.00 15,111.05 20,100.00 89.51 151.55 7,621.65 7,551.20 -10,150.78 13,309.51 5,955,251.58 1,502,693.61 0.00 15,211.04 20,200.00 89.51 151.55 7,622.51 7,552.06 -10,238.70 13,357.14 5,955,162.73 1,502,739.47 0.00 15,311.04 20,300.00 89.51 151.55 7,623.37 7,552.92 -10,326.62 13,404.78 5,955,073.87 1,502,785.33 0.00 15,411.03 20,400.00 89.51 151.55 7,624.24 7,553.79 -10,414.54 13,452.42 5,954,985.02 1,502,831.18 0.00 15,511.02 20,500.00 89.51 151.55 7,625.10 7,554.65 -10,502.46 13,500.05 5,954,896.17 1,502,877.04 0.00 15,611.01 20,600.00 89.51 151.55 7,625.96 7,555.51 -10,590.38 13,547.69 5,954,807.31 1,502,922.90 0.00 15,711.01 20,700.00 89.51 151.55 7,626.83 7,556.38 -10,678.30 13,595.33 5,954,718.46 1,502,968.76 0.00 15,811.00 20,800.00 89.51 151.55 7,627.69 7,557.24 -10,766.22 13,642.96 5,954,629.61 1,503,014.61 0.00 15,910.99 20,900.00 89.51 151.55 7,628.55 7,558.10 -10,854.14 13,690.60 5,954,540.75 1,503,060.47 0.00 16,010.99 21,000.00 89.51 151.55 7,629.41 7,558.96 -10,942.06 13,738.24 5,954,451.90 1,503,106.33 0.00 16,110.98 21,100.00 89.51 151.55 7,630.28 7,559.83 -11,029.98 13,785.87 5,954,363.05 1,503,152.19 0.00 16,210.97 21,200.00 89.51 151.55 7,631.14 7,560.69 -11,117.90 13,833.51 5,954,274.20 1,503,198.04 0.00 16,310.97 21,300.00 89.51 151.55 7,632.00 7,561.55 -11,205.82 13,881.15 5,954,185.34 1,503,243.90 0.00 16,410.96 21,400.00 89.51 151.55 7,632.86 7,562.41 -11,293.75 13,928.79 5,954,096.49 1,503,289.76 0.00 16,510.95 21,500.00 89.51 151.55 7,633.73 7,563.28 -11,381.67 13,976.42 5,954,007.64 1,503,335.62 0.00 16,610.95 21,600.00 89.51 151.55 7,634.59 7,564.14 -11,469.59 14,024.06 5,953,918.78 1,503,381.47 0.00 16,710.94 21,700.00 89.51 151.55 7,635.45 7,565.00 -11,557.51 14,071.70 5,953,829.93 1,503,427.33 0.00 16,810.93 21,800.00 89.51 151.55 7,636.31 7,565.86 -11,645.43 14,119.33 5,953,741.08 1,503,473.19 0.00 16,910.93 21,900.00 89.51 151.55 7,637.18 7,566.73 -11,733.35 14,166.97 5,953,652.22 1,503,519.05 0.00 17,010.92 22,000.00 89.51 151.55 7,638.04 7,567.59 -11,821.27 14,214.61 5,953,563.37 1,503,564.90 0.00 17,110.91 22,100.00 89.51 151.55 7,638.90 7,568.45 -11,909.19 14,262.24 5,953,474.52 1,503,610.76 0.00 17,210.91 22,200.00 89.51 151.55 7,639.76 7,569.31 -11,997.11 14,309.88 5,953,385.67 1,503,656.62 0.00 17,310.90 22,300.00 89.51 151.55 7,640.63 7,570.18 -12,085.03 14,357.52 5,953,296.81 1,503,702.48 0.00 17,410.89 22,400.00 89.51 151.55 7,641.49 7,571.04 -12,172.95 14,405.15 5,953,207.96 1,503,748.33 0.00 17,510.89 22,500.00 89.51 151.55 7,642.35 7,571.90 -12,260.87 14,452.79 5,953,119.11 1,503,794.19 0.00 17,610.88 22,600.00 89.51 151.55 7,643.21 7,572.76 -12,348.79 14,500.43 5,953,030.25 1,503,840.05 0.00 17,710.87 22,700.00 89.51 151.55 7,644.08 7,573.63 -12,436.71 14,548.06 5,952,941.40 1,503,885.91 0.00 17,810.87 22,800.00 89.51 151.55 7,644.94 7,574.49 -12,524.63 14,595.70 5,952,852.55 1,503,931.77 0.00 17,910.86 22,900.00 89.51 151.55 7,645.80 7,575.35 -12,612.55 14,643.34 5,952,763.69 1,503,977.62 0.00 18,010.85 23,000.00 89.51 151.55 7,646.66 7,576.21 -12,700.47 14,690.97 5,952,674.84 1,504,023.48 0.00 18,110.84 23,100.00 89.51 151.55 7,647.53 7,577.08 -12,788.39 14,738.61 5,952,585.99 1,504,069.34 0.00 18,210.84 23,200.00 89.51 151.55 7,648.39 7,577.94 -12,876.31 14,786.25 5,952,497.14 1,504,115.20 0.00 18,310.83 23,300.00 89.51 151.55 7,649.25 7,578.80 -12,964.23 14,833.88 5,952,408.28 1,504,161.05 0.00 18,410.82 23,400.00 89.51 151.55 7,650.11 7,579.66 -13,052.15 14,881.52 5,952,319.43 1,504,206.91 0.00 18,510.82 23,500.00 89.51 151.55 7,650.98 7,580.53 -13,140.07 14,929.16 5,952,230.58 1,504,252.77 0.00 18,610.81 23,600.00 89.51 151.55 7,651.84 7,581.39 -13,227.99 14,976.79 5,952,141.72 1,504,298.63 0.00 18,710.80 23,700.00 89.51 151.55 7,652.70 7,582.25 -13,315.91 15,024.43 5,952,052.87 1,504,344.48 0.00 18,810.80 23,800.00 89.51 151.55 7,653.56 7,583.11 -13,403.83 15,072.07 5,951,964.02 1,504,390.34 0.00 18,910.79 23,900.00 89.51 151.55 7,654.43 7,583.98 -13,491.76 15,119.70 5,951,875.16 1,504,436.20 0.00 19,010.78 24,000.00 89.51 151.55 7,655.29 7,584.84 -13,579.68 15,167.34 5,951,786.31 1,504,482.06 0.00 19,110.78 24,100.00 89.51 151.55 7,656.15 7,585.70 -13,667.60 15,214.98 5,951,697.46 1,504,527.91 0.00 19,210.77 24,200.00 89.51 151.55 7,657.01 7,586.56 -13,755.52 15,262.61 5,951,608.61 1,504,573.77 0.00 19,310.76 9/26/2016 11:39:42AM Page 8 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A Depth Inclination Design: CD5-99Awp21 TVDss +N/ -S Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 7,587.43 24,300.00 89.51 151.55 7,657.88 7,587.43 -13,843.44 15,310.25 5,951,519.75 1,504,619.63 0.00 19,410.76 24,366.38 89.51 151.55 7,658.45 7,588.00 -13,901.80 15,341.87 5,951,460.77 1,504,650.07 0.00 19,477.13 Start 2633.62 hold at 24366.38 MD - CDS-99 02.Toe 041416 JD 24,400.00 89.51 151.55 7,658.74 7,588.29 -13,931.36 15,357.89 5,951,430.90 1,504,665.49 0.00 19,510.75 24,500.00 89.51 151.55 7,659.60 7,589.15 -14,019.28 15,405.52 5,951,342.05 1,504,711.34 0.00 19,610.74 24,600.00 89.51 151.55 7,660.47 7,590.02 -14,107.20 15,453.16 5,951,253.19 1,504,757.20 0.00 19,710.74 24,700.00 89.51 151.55 7,661.33 7,590.88 -14,195.12 15,500.80 5,951,164.34 1,504,803.06 0.00 19,810.73 24,800.00 89.51 151.55 7,662.19 7,591.74 -14,283.04 15,548.43 5,951,075.49 1,504,848.92 0.00 19,910.72 24,900.00 89.51 151.55 7,663.05 7,592.60 -14,370.96 15,596.07 5,950,986.63 1,504,894.77 0.00 20,010.72 25,000.00 89.51 151.55 7,663.92 7,593.47 -14,458.88 15,643.71 5,950,897.78 1,504,940.63 0.00 20,110.71 25,100.00 89.51 151.55 7,664.78 7,594.33 -14,546.80 15,691.34 5,950,808.93 1,504,986.49 0.00 20,210.70 25,200.00 89.51 151.55 7,665.64 7,595.19 -14,634.72 15,738.98 5,950,720.08 1,505,032.35 0.00 20,310.70 257300.00 89.51 151.55 7,666.50 7,596.05 -14,722.64 15,786.62 5,950,631.22 1,505,078.20 0.00 20,410.69 25,400.00 89.51 151.55 7,667.37 7,596.92 -14,810.56 15,834.25 5,950,542.37 1,505,124.06 0.00 20,510.68 25,500.00 89.51 151.55 7,668.23 7,597.78 -14,898.48 15,881.89 5,950,453.52 1,505,169.92 0.00 20,610.67 25,600.00 89.51 151.55 7,669.09 7,598.64 -14,986.40 15,929.53 5,950,364.66 1,505,215.78 0.00 20,710.67 25,700.00 89.51 151.55 7,669.95 7,599.50 -15,074.32 15,977.17 5,950,275.81 1,505,261.63 0.00 20,810.66 25,800.00 89.51 151.55 7,670.82 7,600.37 -15,162.24 16,024.80 5,950,186.96 1,505,307.49 0.00 20,910.65 25,900.00 89.51 151.55 7,671.68 7,601.23 -15,250.16 16,072.44 5,950,098.10 1,505,353.35 0.00 21,010.65 26,000.00 89.51 151.55 71672.54 7,602.09 -15,338.08 16,120.08 5,950,009.25 1,505,399.21 0.00 21,110.64 26,100.00 89.51 151.55 7,673.40 7,602.95 -15,426.00 16,167.71 5,949,920.40 1,505,445.07 0.00 21,210.63 26,200.00 89.51 151.55 7,674.27 7,603.82 -15,513.92 16,215.35 5,949,831.55 1,505,490.92 0.00 21,310.63 26,300.00 89.51 151.55 7,675.13 7,604.68 -15,601.84 16,262.99 5,949,742.69 1,505,536.78 0.00 21,410.62 26,400.00 89.51 151.55 7,675.99 7,605.54 -15,689.77 16,310.62 5,949,653.84 1,505,582.64 0.00 21,510.61 26,500.00 89.51 151.55 7,676.85 7,606.40 -15,777.69 16,358.26 5,949,564.99 1,505,628.50 0.00 21,610.61 26,600.00 89.51 151.55 7,677.72 7,607.27 -15,865.61 16,405.90 5,949,476.13 1,505,674.35 0.00 21,710.60 26,700.00 89.51 151.55 7,678.58 7,608.13 -15,953.53 16,453.53 5,949,387.28 1,505,720.21 0.00 21,810.59 26,800.00 89.51 151.55 7,679.44 7,608.99 -16,041.45 16,501.17 5,949,298.43 1,505,766.07 0.00 21,910.59 26,900.00 89.51 151.55 7,680.30 7,609.85 -16,129.37 16,548.81 5,949,209.57 1,505,811.93 0.00 22,010.58 27,000.00 89.51 151.55 7,681.17 7,610.72 -16,217.29 16,596.44 5,949,120.72 1,505,857.78 0.00 22,110.57 TD at 27000.00 - 4-1/2" x 63/4" 9/26/2016 11:29:42AM Page 9 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A (usft) (usft) Design: CD5-99Awp21 -6,741.78 11,143.45 Targets - - --- ----- - -- Measured Vertical Vertical Target Name Dip Depth Depth Depth SS Dip Direction hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting Shape (°) (°) (usft) (usft) (usft) (usft) (usft) CD5-99A Polygon 092116 BP 0.00 0.00 7,680.95 -6,741.78 11,143.45 5,958,703.15 1,500,596.63 plan misses target center by 143.38usft at 16028.49usft MD (7586.56 TVD, -6670.16 N, 11224.19 E) 13,688.23 7,017.02 HRZ Polygon 14,415.13 7,316.08 LCU 14,118.38 Point 1 7,680.95 0.00 0.00 5,958,703.15 1,500,596.63 Point 2 7,680.95 -293.55 275.25 5,958,404.15 1,500,865.91 Point 3 7,680.95 -832.14 656.13 5,957,858.06 1,501,235.86 Point 7,680.95 -9,501.55 5,353.36 5,949,096.69 1,505,757.66 Point 5 7,680.95 -9,406.27 5,529.22 5,949,188.41 1,505,935.38 Point 7,680.95 -735.54 831.25 5,957,951.12 1,501,412.88 Point 7,680.95 -169.86 432.43 5,958,524.65 1,501,025.53 Point 8 7,680.95 136.67 146.04 5,958,836.85 1,500,745.37 CD5-99A Csg Pt 0.00 0.00 7,581.85 -6,527.47 11,095.70 5,958,918.36 1,500,553.19 plan misses target center by 0.01 usft at 15836.37usft MD (7581.85 TVD, -6527.46 N, 11095.71 E) Circle (radius 100.00) CD5-99 01.Heel 091616 JD 0.00 0.00 7,605.45 -6,673.44 11,216.47 5,958,770.00 1,500,671.00 plan misses target center by 20.51usft at 16025.92usft MD (7586.54 TVD, -6668.25 N, 11222.47 E) Circle (radius 100.00) CD5-99A 80 deg pt 0.00 0.00 7,443.30 -5,941.64 10,311.55 5,959,519.78 1,499,781.03 plan hits target center Point CD5-99 02.Toe 041416 JD 0.00 0.00 7,658.45 -13,901.80 15,341.87 5,951,460.77 1,504,650.07 plan hits target center Circle (radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name O (") 27,000.00 7,681.17 4-1/2" x 6-3/4" 4-1/2 6-3/4 15,816.38 7,580.45 7-5/8" X 9-7/8" by 11" 7-5/8 11 �I Formations i - - --- ----- - -- Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) i (usft) Name Lithology (°) (°) 5,865.07 3,798.45 K3 0.00 14,998.33 7,470.43 UJU 3,585.14 2,860.45 C10 0.00 11,017.67 5,918.31 Alb96 13,688.23 7,017.02 HRZ 14,415.13 7,316.08 LCU 14,118.38 7,193.99 Kalubik 15,745.36 7,575.06 AlpA 14,978.34 7,466.96 AlpC 6,419.26 4,026.45 K2 / Qannik 0.00 2,517.64 2,312.45 C30 0.00 8,951.97 5,068.45 AIb97 0.00 9/26/2016 11:39:42AM Page 10 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A 450.25 Start DLS 3.00 TFO 180.00 Design: CD5-99Awp21 -502.05 478.62 Plan Annotations i Measured Vertical Local Coordinates Depth Depth +NIS +E/ -W (usft) (usft) (usft) (usft) Comment 2,390.00 2,220.13 -482.62 450.25 Start DLS 3.00 TFO 180.00 2,440.00 2,256.43 -502.05 478.62 Start DLS 3.00 TFO -12.97 3,221.79 2,710.96 -827.85 1,017.10 Start 11207.45 hold at 3221.79 MD 14,429.24 7,321.88 -5,745.32 9,970.58 Start DLS 3.50 TFO 8.81 14,842.09 7,443.30 -5,941.64 10,311.55 Start 345.53 hold at 14842.09 MD 15,187.62 7,503.30 -6,116.90 10,603.22 Start DLS 2.85 TFO 71.61 15,816.38 7,580.45 -6,512.64 11,082.36 Start 20.00 hold at 15816.38 MD 15,836.38 7,581.85 -6,527.46 11,095.71 Start Build 3.50 15,936.66 7,585.77 -6,601.92 11,162.75 Start 500.00 hold at 15936.66 MD 16,436.66 7,590.05 -6,973.48 11,497.30 Start DLS 2.00 TFO 90.08 17,114.16 7,595.90 -7,525.62 11,887.15 Start 7252.22 hold at 17114.16 MD 24,366.38 7,658.45 -13,901.80 15,341.87 Start 2633.62 hold at 24366.38 MD 27,000.00 7,681.17 -16,217.29 16,596.44 TD at 27000.00 9/26/2016 11:39.42AM Page 11 COMPASS 5000.1 Build 74 1:53, September 26 201 Fasting (4000 usft/in)1480000 1482000 1484000 1486000 1488000 1490000 1492000 1494000 1496000 1498000 1500000 1502000 1504000 1506000 1508000 1510000 1512000 151 \T N/7, Nuia ut 1 C CD2 -05 1 V CD5-313 CD4 CD5-99Awp C _4- C - - CD5-17wp06 (6D) CD5-17L1wp06 (6D) CD5-19L1wp08 (8D) - _ _ i CD5-18wp06 (71D) CD5-315 CD5-19wp08 (8D) CD5-18L1wp06 (7D) Easting (4000 usft/in) C Alpine i - D2-40 B1 CD -4 PB1 D: CD4 -07 3 - C 2- CD2 -40 2-33A -C 314 CD -470 5-21 CD2 -43 wp 2 C CD2 -5 'i -W2 -VO CD5-01 CD2 �D2-43 8�j _ W-16 CD5-05 CD4- D4-1 CD5- 6 - CD5-22 p01 D5-08 CD4 -26 v C - 6 CD5- 1 CD4- 04PB1 cm c o CD5-20L1wpg4 Rig: D5-99 Z CD5-20wp04 CD4- 18A CD5-315PB1 CD5-3 3PB1 C CD4 -25 CD4 -25L1 4-32 CD5-314XPB1wp04 4i3 B1 CD5-316PB1 wp04 V CD5-313 CD4 CD5-99Awp C _4- C - - CD5-17wp06 (6D) CD5-17L1wp06 (6D) CD5-19L1wp08 (8D) - _ _ i CD5-18wp06 (71D) CD5-315 CD5-19wp08 (8D) CD5-18L1wp06 (7D) Easting (4000 usft/in) ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: C135-99 Plan: CD5-99A 50-103-20748-00-00 CD5-99Awp21 Clearance Summary Anticollision Report ZdAnti-ColIisi�E, 26 September, 2016 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CDS-99 - Plan: CD5-99A - CD5-99Awp21 Well Coordinates: 5,965,666.90 N, 1,489,591.67 E (70° 18'49.21" N, 151° 13' 20.82" W) Datum Height: CDS-99: 33.9+36.55 @ 70.46usft (Coyon 19) Scan Range: 2,390.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft . Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 ConocoPhillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CD5-99 - CD5-99Awp21 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: CDS-99A - CD5-99Awp21 Scan Range: 2,390.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited CD5 Alpine West Pad CD5-01 - CD5-01 - CD5-01 Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Pass - Major Risk Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft 26.169 Clearance Factor Pass - Major Risk CD4 Nanuq Pad 2,440.00 2,247.16 2,440.00 2,208.26 3,850.00 57.782 Clearance Factor Pass - Major Risk CD4 -26 - CD4 -26 - CD4 -26 23,807.32 1,313.14 23,807.32 967.64 16,425.00 3.801 Clearance Factor Pass - Major Risk CD4 -316 - CD4 -318A - CD4 -31 BA 25,354.56 2,593.74 25,354.56 2,248.90 15,400.00 7.522 Clearance Factor Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,724.35 757.18 21,724.35 546.75 17,250.00 3.598 Centre Distance Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,692.16 773.08 21,692.16 532.07 17,400.00 3.208 Clearance Factor Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 2,390.00 450.78 2,390.00 374.80 2,600.00 5.933 Clearance Factor Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 2,391.74 970.73 2,391.74 930.85 2,925.00 24.337 Clearance Factor Pass - Major Risk CD5 Alpine West Pad CD5-01 - CD5-01 - CD5-01 2,403.83 1,336.29 2,403.83 1,292.38 2,950.00 30.438 Clearance Factor Pass - Major Risk CD5-04 - CD5-04 - CD5-04 2,410.94 230.14 2,410.94 193.93 2,500.00 6.356 Clearance Factor Pass - Major Risk CD5-05 - CD5-05 - CD5-05 2,398.91 1,125.27 2,398.91 1,082.27 2,950.00 26.169 Clearance Factor Pass - Major Risk CD5-06 - CD5-06 - CD5-06 2,440.00 2,247.16 2,440.00 2,208.26 3,850.00 57.782 Clearance Factor Pass - Major Risk CD5-06 - CD5-061-1 - CD5-06L1 2,440.00 2,247.16 2,440.00 2,208.26 3,850.00 57.782 Centre Distance Pass - Major Risk CD5-06 - CD5-061-1 - CD5-061-1 10,376.70 2,475.25 10,376.70 2,135.36 16,657.00 7.283 Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 2,409.58 949.16 2,409.58 906.87 2,850.00 22.443 Clearance Factor Pass - Major Risk CD5-08 - CD5-08 - CD5-08 13,469.92 740.42 13,469.92 581.28 20,155.00 4.653 Clearance Factor Pass - Major Risk CD5-10 - CD5-10 - CD5-10 2,390.00 450.78 2,390.00 374.80 2,600.00 5.933 Clearance Factor Pass - Major Risk CD5-11 - CD5-11 - CD5-11 2,391.74 970.73 2,391.74 930.85 2,925.00 24.337 Clearance Factor Pass - Major Risk CD5-12 - CD5-12 - CD5-12 2,391.10 1,306.22 2,391.10 1,242.31 3,125.00 20.438 Clearance Factor Pass - Major Risk CD5-313 - CD5-313 - CD5-313 2,415.03 386.03 2,415.03 294.95 2,575,00 4.238 Clearance Factor Pass - Major Risk CD5-313 - CD5-313PB1 - CD5-313PB1 2,409.92 408.50 2,409.92 364.00 2,575.00 9.178 Clearance Factor Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp06 (6D) 3,186.44 256.89 3,186.44 202.86 3,525.00 4.754 Centre Distance Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp06 (6D) 13,718.92 489.99 13,718.92 164.43 14,075.00 1.505 Clearance Factor Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-171-1 - CD5-17L1wp06 3,186.44 256.89 3,186.44 202.86 3,525.00 4.754 Centre Distance Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-171-1 - CD5-17L1wp06 13,718.92 489.99 13,718.92 164.43 14,075.00 1.505 Clearance Factor Pass - Major Risk Rig: CD5-99 - Plan: CD5-99AL1 - CD5-99AL1wp20 Rig: CD5-99 - Plan: CD5-99AL1 - CD5-99AL1wp20 Rig: CD5-99 - Rig: CD5-99 - Rig: CD5-99 26 September, 2016 - 11:55 Page 2 of 5 COMPASS Conoco Phillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CD5-99 - CD5-99Awp21 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CDS-99 - Plan: CDS-99A - CD5-99Awp21 Scan Range: 2,390.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft Rig: CDS-99 - Rig: CD5-99 - Rig: CD5-99 Survey tool program From To Survey/Plan Survey Tool (usft) (usft) 100.00 500.00 GYD-GC-SS 572.96 2,270.51 MWD+IFR-AK-CAZ-SC 2,360.53 2,390.00 MWD+IFR-AK-CAZ-SC 2,390.00 4,900.00 CD5-99Awp21 MWD 2,390.00 15,816.38 CD5-99Awp21 MWD+IFR-AK-CAZ-SC 15,836.38 17,336.38 CD5-99Awp21 MWD 15,836.38 27,000.00 CD5-99Awp21 MWD+IFR-AK-CAZ-SC Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 26 September, 2016 - 11:55 Page 3 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 Plan: CD5-99A 50-103-20748-00-00 CD5-99Awp21 Clearance Summary Anticollision Report 26 September, 2016 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: CD5-99A - CD5-99Awp21 Well Coordinates: 5,965,666.90 N, 1,489,591.67 E (70° 18'49.21" N, 151° 13' 20.82" W) Datum Height: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Minor Risked Scan Range: 2,390.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 ConocoPhillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CD5-99 - CD5-99Awp21 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: CD6-99A - CD5-99Awp21 Scan Range: 2,390.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD4 Nanuq Pad CD4 -26 - CD4 -26 - CD4 -26 23,807.32 1,313.14 23,807.32 967.64 16,425.00 3.801 Clearance Factor Pass - Major Risk CD4 -318 - CD4 -318A - CD4 -318A 25,354.56 2,593.74 25,354.56 2,248.90 15,400.00 7.522 Clearance Factor Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,724.35 757.18 21,724.35 546.75 17,250.00 3.598 Centre Distance Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,692.16 773.08 21,692.16 532.D7 17,400.00 3.208 Clearance Factor Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 16,158.98 221.10 16,158.98 208.45 19,400.00 17.468 Clearance Factor Pass - Minor 1/20 CD5 Alpine West Pad CD5-01 - CD5-01 - CD5-01 2,403.83 1,336.29 2,403.83 1,292.38 2,950.00 30.438 Clearance Factor Pass - Major Risk CD5-04 - CD5-04 - CD5-04 2,410.94 230.14 2,410.94 193.93 2,500.OD 6.356 Clearance Factor Pass - Major Risk CD5-05 - CD5-D5 - CD5-05 2,398.91 1,125.27 2,398.91 1,082.27 2,950.00 26.169 Clearance Factor Pass - Major Risk CD5-06 - CD5-06 - CD5-06 2,440.00 2,247.16 2,440.00 2,208.26 3,850.00 57.782 Clearance Factor Pass - Major Risk CD5-06 - CD5-061-1 - CD5-06L1 2,440.00 2,247.16 2,440.00 2,208.26 3,850.00 57.782 Centre Distance Pass - Major Risk CD5-06 - CD5-06L1 - CD5-06L1 10,376.70 2,475.25 10,376.70 2,135.36 16,657.00 7.283 Clearance Factor Pass - Major Risk CD5-07 - CD5-07 - CD5-07 2,409.58 949.16 2,409.58 906.87 2,850.00 22.443 Clearance Factor Pass - Major Risk CD5-08 - CD5-08 - CD5-08 13,469.92 740.42 13,469.92 581.28 20,155.00 4.653 Clearance Factor Pass - Major Risk CD5-10 - CD5-10 - CD5-10 2,390.00 450.78 2,390.00 374.80 2,600.00 5.933 Clearance Factor Pass - Major Risk CD5-11 - CD5-11 - CD5-11 2,391.74 970.73 2,391.74 930.85 2,925.00 24.337 Clearance Factor Pass - Major Risk CD5-12 - CD5-12 - CD5-12 2,391.10 1,306.22 2,391.10 1,242.31 3,125.00 20.438 Clearance Factor Pass - Major Risk CD5-313 - CD5-313 - CD5-313 2,415.03 386.03 2,415.03 294.95 2,575.00 4.238 Clearance Factor Pass - Major Risk CD5-313 - CD5-313PB1 - CD5-313PB1 2,409.92 408.50 2,409.92 364.00 2,575.00 9.178 Clearance Factor Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp06 (6D) 3,186.44 256.89 3,186.44 202.86 3,525.00 4.754 Centre Distance Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp06 (6D) 13,718.92 489.99 13,718.92 164.43 14,075.00 1.505 Clearance Factor Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-1711 - CD5-17L1wp06 3,186.44 256.89 3,186.44 202.86 3,525.00 4.754 Centre Distance Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-171-1 - CD5-17L1wp06 13,718.92 489.99 13,718.92 164.43 14,075.00 1.505 Clearance Factor Pass - Major Risk Rig: CD5-99 - Plan: CD5-99AL1 - CD5-99AL1wp20 ® ® ® 0.006 Clearance Factor R FAIL - No Errors Rig: CD5-99 -Rig: CD5-99 -Rig: CD5-99 ® ® ® 0.060 Clearance Factor FAIL -Minor 10 1/10 26 September. 2016 - 12:31 Page 2 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CD5-99 - CD5-99Awp21 Survey tool program From To Survey/Plan Survey Tool (usft) (usft) 100.00 500.00 GYD-GC-SS 572.96 2,270.51 MWD+IFR-AK-CAZ-SC 2,360.53 2,390.00 MWD+IFR-AK-CAZ-SC 2,390.00 4,900.00 CD5-99Awp21 MWD 2,390.00 15,816.38 CD5-99Awp21 MWD+IFR-AK-CAZ-SC 15,836.38 17,336.38 CD5-99Awp21 MWD 15,836.38 27,000.00 CD5-99Awp21 MWD+IFR-AK-CAZ-SC Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 26 September, 2016 - 12:31 Page 3 of 5 COMPASS gar 12:37, September 26 , Ladder View CD5-99Awnn21 r The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. s m 0 U 300 C I O CO li o � U 150--- 50 — C) 0 U i 0 ( 3500 7000 10500 14000 17500 21000 24500 28000 Displayed interval could be less than entire well:Measured Depth2390.00 To 27000.00 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 100.00 500.00 CD5-99 Srvy 1 - SLB_GYD-GC-Sc;gRP-GMD99) 758014�B167a98" X 9-7/8" by 11" 572.96 2270.51 CD5-99 Srvy 2 - SLB—MWD GMAGIVNW. II;R5*9PAZ-SC 7681 ZMOO.00 4-1/2" x 6-3/4" 2360.53 2390.00 CD5-99 Srvy 3 - SLB . I6B5*PPAZ-SC _MWD+GMAGIVW 2390.00 4900.00 CD5-99Awp21 (Plan: CD5-99A) MWD 2390.0015816.38 CD5-99Awp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 15836.3817336.38 CD5-99Awp21 (Plan: CD5-99A) MWD 15836.38 27000.00 CD5-99Awp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC U U K 60--- 0 --O LD J O CUO '.. .� ... U U I j 0 3500 7000 10500 14000 17500 21000 24500 28000 Partial Measured Depth 0 gar AIL Ladder View 12:39, September 26 CD 5- 9 9 Aw p 2 1 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. o Minor Risked a U 300 I c 0 � Q I a� U o C U 3500 7000 10500 14000 17500 21000 24500 28000 Displayed interval could be less than entire well:Measured Depth2390.00 To 27000.00 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 100.00 500.00 CD5-99 Srvy 1 - SLB_GYD-GC-SSgRI�-GM5-89) 7580'41B1E?a'8" X 9-7/8" by 11" 572.96 2270.51 CD5-99 Srvy 2 - SLB_MWD_GMAGIOW. ICB&% 9PAZ-SC 76812fMOO.00 4-1/2" x 6-3/4" 2360.53 2390.00 CD5-99 Srvy 3 - SLB_MWD+GMA9V9l1�FICB6*6PAZ-SC 2390.00 4900.00 CD5-99Awp21 (Plan: CD5-99A) MWD 2390.0015816.38 CD5-99Awp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 15836.3817336.38 CD5-99Awp21 (Plan: CD5-99A) MWD 15836.38 27000.00 CD5-99Awp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 0 60 —1 __ ___ .. ___ __ c 0 m Q a� m 30— p U C) 0 3500 7000 10500 14000 17500 21000 24500 28000 Partial Measured Depth AIL CDS-99Qwp21 2390.00 To 27000.00 12:13, September 26 2016 SURVEY PeOGRAM th Fra. Depth T Survey/Plan Tool ta0.00 500.00 C-SM'1-SLa_GYD-94-1 -991 5]2.9fi 32]0.51 CDS995rvy2-SLB MWD_OA11DtW§AS16..9{SC 2J6a.53 239040 -A9 Srvy3-SLB MKM(�11116iji6j�OG6�{SC 2J9a.00A90000 CD599Avg31 (Plan: COS99<JWO 2J90.00 15816.38 CW99Avg21 (Plan: -9/,(WDaIFR-W -SC 15836.38 1)336.38 CD599Awp21 (Plan: -%"D836.38 2]Oo0.00 COS99Aw 21 (Plan: CDSB94WLl+IFRAK-SC CASING DETAILS TVD MD Name Size 7580.45 15816.385/8" X 9-7/8" by 11" 7-5/8 7681.17 27000.00 4-1/2" x 6-3/4" 4-1/2 -E -90/270 -12 Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect Target 2Y 44.18 124.40 2220.13 -482.62 45025 0.00 0.00 37.51 244, 42.68 124.40 2256.43 -502.05 478.62 3.00 180.00 667.98 3221.79 65.71 118.78 2710.96 -827.85 1017.10 3.00 -12.97 1208.44 14429.24 65.71 118.78 7321.88 -5745.32 9970.58 0.00 0.00 9753.72 14842.09 80.00 121.00 7443.30 -5941.64 10311.55 3.50 8.81 10087.14 CD5-99A 80 deg pt 15187.62 80.00 121.00 7503.30 -6116.90 10603.22 0.00 0.00 10378.81 15816.38 86.00 138.00 758045 -6512.64 11082.36 2.85 71.61 10953.17 15836.38 86.00 138.00 7581.85-6527.46 11095.71 0.00 0.00 10972.53 15936.66 89.51 138.00 7585.77 -6601.92 11162.75 3.50 0.00 11069.75 16436.66 89.51 138.00 7590.05 -6973.48 11497.30 0.00 0.00 11554.88 17114.16 89.51 151.55 7595.90 -7525.62 11887.15 2.00 90.08 12225.40 24366.38 89.51 151.55 7658.45 -13901.80 15341.87 0.00 0.00 19477.13 CD5-99 02.Tce 041416 JD 27000.00 89.51 151.55 7681.17 -16217.29 16596.44 0.00 0.00 22110.57 f"'Failed Arai-Collisiorx 0/360 0 2340 2340 2500 2500 3000 3000 3900 3900 4950 4950 6000 6000 _- "-" 7050 7050 8100 8100 9150 9150 "_W 10200 10200 12300 12300 14400 14400 16500 16500 18600 18600 20700 20700 22800 22800 24900 24900 27000 -150/210 _ -_ 210__ - 150 -180/180 m o- m o- = $ 66�2aWw9n�9�'g°�o�a9�p 0 CASING DETAILS TVD MD Name Size 7580.45 15816.385/8" X 9-7/8" by 11" 7-5/8 7681.17 27000.00 4-1/2"x6-3/4" 4-1/2 Minor Risked 0/360 -E -90/270 IM 0 23E 44.18 124.40 2220.13 -482.62 450.25 0.00 0.00 ;7.51 CD5-99Awp21 244, 42.68 124.40 2256.43 -502.05 478.62 3.00 180.00 ,67.96 10200 3221.79 65.71 118.78 2710.96 -827.85 1017.10 3.00 -12.97 1208.44 20700 14429.24 65.71 118.78 7321.88 -5745.32 9970.58 0.00 0.00 9753.72 /'� 2390/� .00 To 27000.00 14842.09 80.00 121.00 7443.30 -5941.64 10311.55 3.50 8.81 10087.14 CD5-99A 80 deg pt 15187.62 80.00 121.00 7503.30 -6116.90 10603.22 0.00 0.00 10378.81 15816.38 15836.38 86.00 86.00 138.00 138.00 7580.45 7581.85 :6512.64 -6527.46 11082.36 11095.71 2.85 0.00 71.61 0.00 10953.17 10972.53 12:11, September 26 2016 15936.66 16436.66 17114.16 89.51 89.51 89.51 138.00 138.00 151.55 7585.77 7590.05 7595.90 -6601 92 -6973.48 -7525.62 11162.75 11497.30 11887.15 3.50 0.00 2.00 0.00 0.00 90.08 11069.75 11554.88 12225.40 SURVEY PROGRAM 24366.38 27000.00 89.51 89.51 151.55 151.55 7658.45 7681.17 -13901.80 -16217.29 15341.87 16596.44 0.00 0.00 0.00 0.00 19477.13 CD5-99 02.Toe 041416 JD 22110.57 mn From Deem m S-Y/PhI tool 100.00 500.00 CD5-995rvy1-SLB GYOGR:4B+BO �OS99� 5]2.96 22]0.51 GD5- S,,2-5La MVJD_ORJtti11RJAO6AH15C 2360.53 2390.00 C06A95rvy]-SLB_MK9+(3�IAO�IB�' 2390.00 0.900.00 C-Avq (Plan: CD599.1WD 2390.00 15816.38 CDSA9Axp21 CO6&9.ErN9�IFRAKLA2-SC (Plan: 15836.36 1]336.36 GD559Aw 21 (Plan: GD599,4I 15636.36 2)000.00 GDS-99Awp21 (%an: GDSA9MM/DiIFRAHLAZ-SC CASING DETAILS TVD MD Name Size 7580.45 15816.385/8" X 9-7/8" by 11" 7-5/8 7681.17 27000.00 4-1/2"x6-3/4" 4-1/2 Minor Risked 0/360 -E -90/270 IM 0 2340 2340 2500 2500 3000 3000 3900 3900 4950 4950 6000 6000 " " 7050 7050 8100 8100 9150 9150 "- 10200 10200 12300 12300 14400 14400 16500 16500 18600 18600 20700 20700 22800 22800 24900 24900 27000 � = s -180/180 e- $ 0 :41, September 26 AC wens ONLY CD5-02A (NOT a Spider) CD5 3 CD 07 CD J CD5 Alpine West Pad O Lo -314 t 0 Z Easting (5000 usftlin) CD2 Alpine Pad CD5-02 )5-04 %I- CD5-01 CD5-05 CD D5-08 - CD4-2ECD tD 1 Rig: CD5- CD5-313PB1 4-3 1 CD5-313 Easting (6000 usftlin) CD4 -318A CD5-99Awp21 CD4 Nanuq Pad AC Flipbook MD Casing Details 0/36o Survey Program TVD MD Name 80'45 816387-5/9"X9-71 8" 'byll Depth From Depth To Survey/Plan Tool C D 5 9 9 AW 2 7681n7 27000.00 4-1/2" x 6-3/4" .0 00 5 00.00 CD Sry 1 - SLB GYD GC -SS (Rig: CD GYD GC SS 5-99 Y ( d 5-99) p 2440.00 572.96 2270.51 CD5-9q Srvy2-SLB-MWD-GMAC (Rig: CD5-g4MWD+IFR-AK-CAZ-SC 9 2340 2500 2360.53 2390.00 CD5-99Srvy3-SLB MWD+GMAG (Rig: CD5-9MWD+IFR-AK-CAZ-SC 2500 2390.00 4900.0- CD5-99Awpz1(Plan: CD5-99A) MWD z390 00 15816.38 CDS,q=wp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ SC Z 3 9 o. o O To 16 o o o. o O 15636.38 17336.36 CDS-99Awpz1 (Plan: CDS-99A) MWD 15187.62 121.00 15 836 .38 2700o.-0 CD5-99Awp21(Plan: CDS-99A) MWD+IFR AK-CAZ-SC MD Azi 0/36o 0 2340 2390.00 124.40 2440.00 124.40 -30/33 9 2340 2500 3221.79 118.78 2500 3000 14429.24 118.78 3000 3900 14842.09 121.00 15187.62 121.00 6o 3900 4950 15816.38 138.o0 -60 / 300 60 4950 6000 15836.38 138.00 6000 -__ ____._-_ 7050 15936.66 138.00 16436.66 138.00 30 7050 8100 17114.16 151.55 Rig: CD5-99 81oo 9150 24366.38 151.55-- 0 / Z70 9150 _ 10200 27000.00 151.5 go 10200 12300 12300 14400 30 14400 16500 16500 18600 -120/240 120 18600 20700 6o 20700 22800 22800 24900 . ,. ► _ ... . ^ _ 24900 27000 -18o/18o 12:57, September 26 2016 MD Casing Details 0/360 0 Survey Program 2390.00 TVD MD Name 75887 15816.38 8"X 9 -718"1/2"x by 11" Depth From Depth To Survey/Plan Tool CD5 99Awpzl 7681.17 27000.08 q-0/2" x 6-3/4" 100.00 5 00.00 CD 5-99 Srvy 1 - SLB GYD-GC-SS (Rig: CD5-99) CYD-GC-SS 0 2340 2500 572.96 2270.51 CD5-995rvy 2 -SLB MWD GMAC (Rig: CDS-g9)WD+IFR-AK-CAZ-SC 2500 2360.53 2390.00 CD5-99 Srvy3- SLB_MWD+GMAG(Rig: CD5-gMWD+IFR AK-CAZ-SC 2390.00 4900.00 CD5-99Awp21 (Plan: CDS-99A) MWD `J 1 ^ O 0 O.0 O �O O 0 O.O O 2390.00 8836.38 5816.38 17336.38 CD5-99Awp21 (Plan: CD 99A) MWD+IFR-AK CAZ SC CDS-99Awp21 (Plan: CD 99A) MWD 15187.62 121.00 15836.38 27000.00 CD5-9gAwp21 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC MD Azi 0/360 0 2340 2390.00 124.40 0 2440.00 124.40 -30/33 9 0 2340 2500 3221.79 118.78 2500 3000 14429.24 118.78 3000 3900 14842.09 121.00 15187.62 121.00 6o 3900 4950 15816.38 138.004950 6o/300 6o 6000 15836.38 138.00 6000 __ __ _ 7050 15936.66 138.00 16436.66 138.00 30 7050 8100 17114.16 151.55 8100 9150 24366.38 151.55 0 / 270 9150 10200 27000.00 151.5 go 10200 12300 12300 14400 30 14400 16500 16500 18600 -120/240 120 18600 - 20700 6o 20700 22800 22800 24900 24900 27000 -180/18o 12:58, September 26 2016 ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 50-103-20748-00-00 Plan: CDS-99A Plan: CD5-99Awp21 Error Ellipse Survey Report 26 September, 2016 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan. CD5-99A Design: CD5-99Awp21 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig. CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature 1.00 sigma EDM Production project Western North Slope, North Slope Alaska, United States Wap System: US State Plane 1983 System Datum: Mean Sea Level Seo Datum: North American Datum 1983 Using Well Reference Point Jap Zone: Alaska Zone 4 Using geodetic scale factor Site CD5 Alpine West Pad From To 1 Site Position: (usft) Survey (Wellbore) Northing: 5,965,528.00 usft Latitude: 70° 18'47.778 N From: Map Easting: 1,489,252.00 usft Longitude: 151° 13'30.647 W `Position Uncertainty: - 0.00 usft Slot Radius: 13-3/16 " Convergence: -1.15 27,000.00 CD5-99Awp21 (Plan: CD5-99A) Bias Error -Grid of Bias Well Rig: C135-99 Azimuth Tool (usft) (') Well Position +N/ -S 0.00 usft Northing: 5,965,666.90 usft Latitude: 70° 18' 49.211 N (usft) +E/ -W 0.00 usft Easting: 1,489,591.67 usft Longitude: 151° 13'20.821 W Position Uncertainty r) 0.00 usft Wellhead Elevation: Ground Level: 33.90 usft 2,220.13 2.17 -0.23 4.33 0.05 Wellbore Plan: CD5-99A 0.66 4.47 2.22 ; Magnetics Model Name Sample Date Declination Dip Angle Field Strength 2.20 -0.21 4.54 (°) (°) (nT) 0.62 BGG M2016 10/1/2016 17.52 80.81 57,510 140.01 MWD (1, 4) 3,221.79 65.71 118.78 2,710.96 Design CD5-99Awp21 13.33 3.06 2.28 Audit Notes: 3.22 13.39 2.97 124.57 MWD (1, 4) Version: 65.71 Phase: PLAN Tie On Depth: 2,390.00 Vertical Section: 72.15 Depth From (TVD) +N/ -S +E/ -W Direction 6.18 13.83 (usft) (usft) (usft) (°) 36.55 0.00 0.00 152.00 Survey Tool Program Date 9/26/2016 From To (usft) (usft) Survey (Wellbore) 100.00 500.00 CD5-99 Spry 1 - SLB_GYD-GC-SS (Rig: C 572.96 2,270.51 CD5-99 Srvy 2 - SLB_MWD_GMAG (Rig: 2,360.53 2,390.00 CD5-99 Srvy 3 - SLB_MWD+GMAG (Rig: 2,390.00 4,900.00 CD5-99Awp21 (Plan: CD5-99A) 2,390.00 15,816.38 CD5-99Awp21 (Plan: CD5-99A) 15,836.38 17,336.38 CD5-99Awp21 (Plan: CD5-99A) 15,836.38 27,000.00 CD5-99Awp21 (Plan: CD5-99A) Position uncertainty and bias at survey station Tool Name GYD-GC-SS M WD+I FR-AK-CAZ-SC M WD+I F R-AK-CAZ-SC MWD M WD+I FR-AK-CAZ-SC MWD M WD+I F R-AK-CAZ-SC Description Gyrodata gyro single shots MWD+IFR AK CAZ SCC MWD+IFR AK CAZ SCC MWD - Standard MWD+IFR AK CAZ SCC MWD - Standard MWD+IFR AK CAZ SCC Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (') (") (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) r) 2,390.00 44.18 124.40 2,220.13 2.17 -0.23 4.33 0.05 1.23 0.60 0.66 4.47 2.22 141.26 MW0+1FR-AK-CAZ-SC (1, 3) 2,440.00 42.68 124.40 2,256.43 2.20 -0.21 4.54 0.16 1.23 0.62 0.70 4.67 2.23 140.01 MWD (1, 4) 3,221.79 65.71 118.78 2,710.96 2.99 -0.59 13.33 3.06 2.28 0.87 3.22 13.39 2.97 124.57 MWD (1, 4) 14,429.24 65.71 118.78 7,321.88 20.61 -0.54 72.15 0.09 18.70 6.18 13.83 72.17 9.46 120.15 MWD-lFR-AK-CAZ-SC (2, 4) 9/26/2016 12:42:09PM Page 2 COMPASS 5000.1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: C05 -99A Design: CD5-99Awp21 Position uncertainty and bias at survey station ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig: CD5-99 C05-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature 1.00 sigma EDM Production Measured Inclination Azimuth Vertical Highside Lateral Casing Vertical Magnitude Semi -major Semi+nmor Diameter Depth (usft) Name - hit/miss target Dip Angle Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Toot (usft) 1°I (°I Nell) (use) (use) (usft) (use) (usft) (use) (usft) (usft) (usft) (°I 14,842.09 80.00 121.00 7,443.30 20.55 -4.02 74.52 -0.40 19.38 6.37 14.47 74.53 9.69 120.16 MWD+IFR-AK-CAZ-SC (2, 4) 15,187.62 80.00 121.00 7,503.30 21.15 -4.02 76.43 -0.40 19.97 6.45 14.91 76.44 9.81 120.19 MWD+IFR.AK-CAZ-SC (2,4) 15,816.38 86.00 138.00 7,580.45 21.44 -5.59 75.44 -4.43 21.05 6.55 15.65 79.04 9.98 120.49 MWD (2, 5) 15,836.37 86.00 138.00 7,581.85 21.46 -5.59 75.54 4.38 21.05 6.55 15.66 79.15 10.08 120.47 MWD (2, 5) 15,936.66 89.51 138.00 7,585.77 21.10 -6.44 76.18 -3.89 21.05 6.55 15.63 79.76 10.10 120.62 MWD (2, 5) 16,025.92 89.51 138.00 7,586.54 21.12 -6.44 77.28 -3.08 21.07 6.56 15.60 80.81 10.18 120.87 MWD (2, 5) 16,028.49 89.51 138.00 7,586.56 21.12 -6.44 77.28 -3.08 21.07 6.56 15.60 80.81 10.18 120.87 MWD (2, 5) 16,436.66 89.51 138.00 7,590.05 21.22 .6.44 79.80 -1.41 21.17 6.56 15.67 83.18 10.47 121.46 MWD (2,5) 17,114.16 89.51 151.55 7,595.90 21.60 -6.44 78.00 -1.70 21.57 6.56 16.01 88.40 11.85 123.20 MWD (2, 5) 24,366.38 89.51 151.55 7,658.45 26.05 -6.45 95.07 -7.71 26.03 6.63 23.31 102.03 20.63 129.80 MWD+IFR.AK-CAZ-SC (3, 5) 27,000.00 89.51 151.55 7,681.17 29.07 1.45 106.71 -7.71 29.05 6.65 25.84 112.33 23.93 132.90 MWD+IFR-AK-CAZ-SC (3, 5) Design Targets - - .._.__.._..._.--- -___-- ---� Measured Vertical Casing Target Name Depth Depth Diameter Diameter (usft) (usft) Name - hit/miss target Dip Angle Dip Dir. TVD +N/ -S +g/ -W Northing Easting 15,816.38 -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude CD5-99A 80 deg pt 0.00 0.00 7,443.30 -5,941.64 10,311.55 5,959,519.78 1,499,781.03 70' 17' 50.703 N 151' 8'20.232 W plan hits target center - Point CD5-99A Csg Pt 0.00 0.00 7,581.85 -6,527.47 11,095.70 5,958,918.36 1,500,553.20 70° 17'44.930 N 151° 7' 57.399 W plan misses target center by 0.01 usft at 15836.37usft MD (7581.85 TVD, -6527.46 N. 11095.71 E) Circle (radius 100.00) CD5-99 02.Toe 041416. 0.00 0.00 7,658.45 -13,901.80 15,341.87 5,951,460.77 1,504,650.07 70° 16'32.328 N 151° 5' 54.069 W plan hits target center Circle (radius 100.00) CD5-99A Polygon 09211 0.00 0.00 7,680.95 -6,741.78 11,143.45 5,958,703.15 1,500,596.63 70° 17'42.822 N 151'7'56.016 W - plan misses target center by 143.38usft at 16028.49usft MD (7586.56 TVD, -6670.16 N, 11224.19 E) - Polygon Point 1 7,680.95 0.00 0.00 5,958,703.15 1,500,596.63 Point 7,680.95 -293.55 275.25 5,958,404.16 1,500,865.91 Point 7,680.95 -832.14 656.13 5,957,858.06 1,501,235.87 Point 7,680.95 -9,501.55 5,353.36 5,949,096.69 1,505,757.66 Point 5 7,680.95 -9,406.27 5,529.22 5,949,188.42 1,505,935.39 Point 7,680.95 -735.54 831.25 5,957,951.12 1,501,412.88 Point 7,680.95 -169.86 432.43 5,958,524.65 1,501,025.53 Point 8 7,680.95 136.67 146.04 5,958,836.85 1,500,745.38 Casing Points - - .._.__.._..._.--- -___-- ---� Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 2,337.14 2,181.69 10-3/4" x 13-1/2" 10-3/4 13-1/2 15,816.38 7,580.45 7-5/8" X 9-7/8" by 11" 7-5/8 11 27,000.00 7,681.17 4-1/2" x 6-3/4" 4-1/2 6-3/4 9/26/2016 12:42:09PM Page 3 COMPASS 5000.1 Build 74 13:11, September 26 2016 I C D 5 9 9 Aw p 21 Name WELLBORE TARGET DETAILS (MAP CO-ORDINATES) TVD Shape CD5-99A 80 deg pt 7443.30 Point Quarter Mile View CDA Csg PI 7581.85 Circle (Radius: 1320.0 CD5-99 02.Toe 041416 JD 7658.45 Circle (Radius: 100.00)) CD5.99A Polygon 092116 BP 7680.95 Polygon -3000 c-6000 U) I 0 0 0 9000 -15000 :111 3000 eUUU 9000 12000 15000 18000 21000 24000 27000 West( -)/East(+) (3000 usfit/in) CD5-99Awp20 Surface Location CPAAI Coordinate Com�erter — u From: ____.___ -.— To: _ -__----_ --- Datum: INAD83 w Region: alaska Datum: NA627 - Region: alaska r Latitude}Lan itude --�`'-� 9 Decimal Degrees :J i Latitude/Longitude Decimal Degrees i" UTM Zone: F_ F South t UTM Zone: True i South #+ State Plane Zone: 14 I Units: us-ft ro' Stake Plane Zone: Units: us fk Legal Description (NAD27 only) Legal Description (NAD27 only) Starting Coordinates: - - ----- X: 11489591.67 - Ending Coordinates: --- --- X: 349558.527980958 Y: 1596566E90 _ i i Y: 5965920.93081628 .................Transform Quik Help ------- CD5-99Aw 20 Surface Location CPAII Coordinate C-n er#er =' i 9, ' �13 From: -- To:- Datum: INAD83 I Region: alaska Datum: NAD27 Region: !alaska .------ r Latitude/Longitude Decimal Degrees LatitudelLongitude Decimal Degrees w C UTM Zone: f— r South t UTM Zone: True r South i Stake Plane Zone: 4 Units: us-ft �I Stake Plane Zone: 4 Units: us-ft C` Legal Descri Minn IvI,A,D27 nnly' : Legal Description (NAD27 only) Starting Coordinates: — Legal Description-- escription _-X: X:1489591.67 Y: 5965666.90 Township: 011 N w' Range: 004 E .. Meridian: � Seckion:7g FNL 1 128765168 1FEL ;I 2420.8262 I .... Transform Quik Help CD5-99Awp20 Surface Casing rZ, CPPdCooT-dinate Converter From: To: i Datum: INAD83 Region: P-1a.ka Datum: [RA�D27, Region: jajas C LatitudeiLongitude Decimal Degrees LatitudelLongitude [Decimal Degrees UTM Zone: F_ F South UTM Zone: ITrue i South r- Skate Plane Zone: 4 Units: usft----I i I Skate Plane Zone: 14 Units: fus -ft I- Legal Description (NAD27 only] r' Legal Description (NAD27 only) i. Starting Coordinates:--------- Ending Coordinates: X: 11490002.71 X: .554317293 Y: 15965196.62 Y: 1 5965450.E497947 .......... Quit Help Transform ................ ............... CD5-99Awp20 Surface Casing CPAI Coordinate Converter- F From: --- , Datum: _N_A_ D8_ -3 ---- Region: jalaska Latitude/Longitude ]DecimalDegrees UTM Zone: South fo- Stake Plane Zone: Units: us Ft Legal De.�,criptiori (NAD -17 Cq-11yl ,L, - . Starting Coordinates: --- X: 1490002.71 Y: 15965196.62 -To: Datum: I NAD27 T, Region: fa—laska Latitude/Longitude IDecimal Degrees__� UTM Zone: f—True r South State Plane Zone:I. ' Units: 14 usft Legal Description (NAD27 only) Legal Description -__-_.__I_ -- ___I Township: [0-11 IN ] Range: Foo -4 Meridian: ju j Section: ri —e [FN L ] F749 03855 fFEL 2002.2042 .......... ...... Transform ............... Quit Help .......... CD5-99Awp20 _Top of Production CPAI Coordinate Converter From: -- Datum: [_NA_D83 + Region: jalaska C Latitude/Longitude Decimal Degrees C UTM Zone: ` F South C State Plane Zone: r4 ------,l Units: jus.ft + C- Legal Description (NAD27 only) Starting Coordinates: --- X: 11500492.96 Y: 15958986.23 CD5-99Awp20 To CPA-, oo:Tdinate Converter From: To: _-_----____--- Datum: jiU627 Region: jalaska Latitude/Longitude Decimal Degrees r UTM Zone: True F South Stake Plane Zone:4 + Units: us -ft +, t" Legal Description (NAD27 only) -Ending Coordinates: - -- --- X: 360459.67821528 Y: 5959239.86676119 ..................................... .............. , Transform.................J Quit Help of Production Datum: NAD83 Region: alaska + Latitude/Longitude Decimal Degrees + t� UTM Zone: j- r South Stake Plane Zone: 4 + Units: us -ft t _- e�Du7 1 Starting Coordinates: - X: 1500492.96 Y: 15958986.23 To: Datum: NAD27 + Region: alaska t Latitude/Longitude IDecimal Degrees + j C' UTM Zone: True i South i" State Plane Zone: 4 + Units: us -ft _'_I t- Legal Description (NAD27 only) Legal Description I i Township: 011 N Range: 004 E + Meridian: Section: 1 21 FNL + 1476.9351 IFEL +j 1972.0014 ... .... Transform Quit Help CD5-99Awp20 Intermediate Casing I I CPAI Coordinate Converter t I From: Datum: FAD83 Region:ala.k. r Latitude/Longitude Decimal Degrees r UTM Zone: F S outh C+ State Plane Zone: Units: lus-ft (– Legal Description (NAD27 only) Starting Coordinates: X: 11500540.15 Y: [5958933.45 --- To:-- 1 o:1 Datum: FAD -27 � Region: F_laska�-] Latitude/Longitude (Decimal Degrees C' UTM Zone: I—True South 66' State Plane Zone: F4 Units: us -ft Legal Description (NAD27 only) Ending Coordinates: X: 360506.8664864 Y: 59E9187.08478915 I Quit ransG'M'* - y ... .............. Help CD5-99Awp20 Intermediate Casing I CPA' Coordinate Converter' From: Datum: INAD83 Region: ra–ja7—ka----7,'j Latitude/Longitude DecimalDegrees UTM Zone: I F South (-- Skate Plane Zone: F Units: us —ft :-] Starting Coordinates: X: 1500540.15 Y: 15958933.45 To: Datum: FN_AD_2_7,.,j Region: 1;laska Latitude/Longitude DecimallDegrees UTM Zone: f—True South State Plane Zone: 7: Units: F I us ft 4- Legal Description (NAD27 only) -Legal Description Township: I—oll N Range: fo —64 iE Meridian: Section: 21 JFNLIiE6.8425 FEL I FJ_923 I — .......... .......... Transform * Quit Help ... .. ...... .......... ; I jCD5-99Awp20 TD I n, CPPJ C,,,-di,,t, C,n,,,,t,, o 0- 1, S3 From: To: I Datum: Region: alaska Datum: ND27 Region: aizz, Latitude/Longitude jDecimal Degrees -------�,] Latitude/Longitude ]Decimal Degrees r- UTM Zone: F South UTM Zone: f—True F South r- State Plane Zone: 4 Units: us -ft -ft State Plane Zone: 4 Units: usft Legal Description (NAD27only) i Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates: X: 1505846.52 X: [ 36-5812.76355975 Y: 15949142.55 Y: f59-49395.86412911 ............ ........... Transform Quit Help .......................................................... - --:1 ------------- * I ICD5-99Awr)20 TD As -built REV I DATE BY I CK I APP DESCRIPTION REV I DATE BY APP DESCRIPTION 1 4/24/15 CZ DB C.APER K150003ACS 2 5/2/16 CZ . UPDATED GD C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT s w , LOCATION OF� 7: THIS SURVEY n T12 CPAD T11 N CD4 TO ALPINE r , r D' CD5_ ACCESS ROAD •�a'� CD in ILYF � O / i{ 1 D 'a y ,\ R' LL CD1 - IT IP, t i VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E. U.M. PPD CD -5 OF a PAD SHOD�DDR ��aGs oo DESSGN x oo N� ��ooa000a�XXjo �:��;••- e ; . ! N�oc°co •! •s.�Cp5,X�4 \ \ ><" NN -ern •_ • _ PLANT N N a NOTE: 15'4052" c� CONDUCTOR CD5—x14 WAS PLUGGED AND � 0 ABANDONED APRIL 2016. LCMF KUUKPIK z UMIAQ ALPINE SURVEY OFFICE PHONE : 907-670-4739 �.� ALPINE MODULE: CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE—CD50-1025 1 OF 3 2 REV I DATE I BY I CK I APP DESCRIPTION --7REVI DATE I BY I APP I DESCRIPTION 1 4/24/15 1 CZ I DB I C. A. 1 UPDATED PER K150003ACS 1 2 5/2/16 CZ I GD I C. A. 1 UPDATED PER K160003ACS ALL CONDUCTORS WELL Y' ARE LOCATED IN PROTRACTED SEC. X' LAT.(N) LONG.(W) 18, T 11 N, SEC.LINE 0/S FNL FWL R 4 GND E, U. M. EXIST. PAD CD5-x99 5,965,666.90 1 489 591.67 70' 18 49.211 151' 13 20.820 287 2508 27.5 33.9 CD5-x01 5,965,661.64 1489572.44 70' 18 49.155 151' 13 21.378 293 2489 27.6 34.1 CD5-x02 5,965,656.28 1 489553.29 7018 49.099 151' 13 21.934 299 2470 28.1 34.1 CD5-x03 5,965,650.92 1 489534.00 70' 18 49.042 151' 13 22.493 305 2451 28.4 34.1 CD5-x04 5,965,645.24 1,489 514.77 70' 18 48.982 151' 13 23.051 311 2432 26.6 34.2 CD5-x05 5,965,639.80 1 489 495.46 70' 18 48.925 151' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151 13 24.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1,489,437.69 70' 18 48.757 151 13 25.287 334 2355 28.1 34.3 CD5-x09 5,965,618.27 1 489 418.53 70' 18 48.698 151 13 25.842 340 2336 27.3 34.2 CD5-x10 5,965,613.12 1 489,399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 34.1 CD5-x11 5,965,607.66 1,489,379.86 70' 18 48.586 151' 13 26.964 39-1--"2297' 27.9 34.1 CD5-x12 5,965,602.23 1489360.56 70' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965 596.59 1,489,341.43 70' 18 48.470 151' 13 28.079 363 2259 26.1 34.2 . nc c_r 3,3,+8L-48-.4+4-"'151' +-3:� -3&8' 22248 27.6' -J� CD5-14X 5,965,589.94 1 489 317.35 70' 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1 489 303.11 70' 18 48.359 151 13 2 9.19 0 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1 489283.58 7018 48.300 151 13 29.757 380 2202 27.6 1 34.0 CD5-x17 5,965,575.11 1 489 264.31 70' 18 48.243 151' 13 30.316 386 2183 27.7 34.0 CD5-x18 5,965,569.79 1,489 245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1 489 225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965,558.96 1 489 206.70 70' 18'78.073- 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,96 553.51 1,4 9187.22 70' 18 48.016 151' 13 32.552 409 2106 27.8 33.8 CD5-x22 5,965,548.14 1489168.15 70' 18 47.959 151 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965,542.72 1,489 148.81 70' 18 47.902 151' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1 489 129.64 70' 18 47.846 151' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1489110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5,965,526.59 1 489 091.09 70' 18 47.732 151' 13 35.340 208 2010 26.3 33.7 CD5-x27 5,965,521.20 1 489071.88 70' 18 47.675 151' 13 35.897 444 1991 27.5 33.7 CD5-x28 5,965,515.81 1 489 052.48 70' 18 47.618 151' 13 36.460 449 1972 27.4 33.6 CD5-x29 5,965,510.40 1,489,033.34 70' 18 47.561 151 13 37.015 455 1953 27.6 33.6 CD5-x30 5,965,504.97 1,4 9,014.02 70' 18 47.504 151 13 37.575 461 1934 25.3 33.6 CD5-x31 5,965,499.57 1 489994.73 70' 18 47.447 151 13 38.135 467 1915 26.6 33.6 CD5-x32 5,965,494.13 1,488,975.45 70' 18 47.390 151 13 38.694 473 1895 26.8 33.6 CD5-x33 5,965,488.7 1,488,956.35 70' 18 47.333 151' 13 39.248 478 1876 27.0 33.6 NAD 8 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. KUUKPIK U M I A Q ALPINE SURVEY OFFICE PHONE : 907-670-4739 y� ConocoPhillips Alaska, Inc. ALPINE MODULE: CD50 ALPINE PROJECT CD-5 WELL CONDUCTORS AS-BUILT LOCATIONS UNIT: CD CADD FILE N0. 15-03-02-1 04/18/2015 I DRAWING NO: CE-CD50-1025 PART: 1 1 OF 3 REV: 2 CD5 — 99A Alpine A/C Dual Lateral Producer Proposed Schematic 20" 94# H-40 Welded Conductor to 116' MD 10-3/4" 45.5# L-80 HYD 563 x BTC Surface Casing at 2,337' MD 3-1/2" 9.3# L-80 eue8rd Upper Completion: 1) 3-'/" 9.3#/ft eue8rd 2) Shallow X nipple profile 2.813" ID 3) 3-'/z" x V Camco KBMG GLM (xx°) w/DCK2 pinned for 2500 psi casing to tbg shear 4) TNT Packer 5) CMU sliding sleeve 6) X Nipple profile, 2.813" 7) TNT Packer 8) XN Nipple profile, 2.813" 9) Mirage Plug Lower Completion: 7) Plop and drop liner in C sand - no junction -4.5" 12.6# L-80 w/ perf pups 8) ZXP liner top packer & Flexlock Liner Hanger XO 5" Hydril 521 Box X 4-'/" IBTM pin -4.5" 12.6# L-80 w/ Frac Ports 7 5/8" 29.7# L-80 Hyd 563 x BTC Intermediate Casing at 15,816' MD ------------------------------------------------- 0 0 0 0 0 Mirage Plug 15,075' C sand Lateral 6 3/4" Hole TD 14,978'— 27,000' MD -------------------------------------------------------------------- 4 %" 12.6# L-80 TXP Liner w/ perf pups 0 0 0 0 0 0 0 --------------------------------------------------------------------------- ' --------------------------------------------------------------- 4-1/2" 12.6# L-80 TXP Liner w/ frac ports 0 11 0 0 11 0 11 0 0 I I 0 I I 0 I I 0T-1 0 11.10 ----------------------------- A sand Lateral 6 3/4" Hole TD 15,816'- 27,000' MD THE STATE of L A SS K A GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Cas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Colville River Field, Alpine Oil Pool, CRU CD5-99A ConocoPhillips Alaska, Inc. Permit to Drill Number: 216-122 Surface Location: 287' FNL, 2421' FEL, SEC. 18, TI IN, R4E, UM Bottomhole Location: 656' FNL, 1731' FEL, SEC. 34, TI IN, R4E, UM Dear Mr. Alvord: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Cathy . Foerster Chai DATED this2 day of September, 2016. STATE OF ALASKA AL KA OIL AND GAS CONSERVATION COMMS ON PERMIT TO DRILL "'_ .. l L° 20 AAC 25.005 1 a. Type of Work . I 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill,; Latera ❑ Stratigraphic Test ❑ Development - Oil ❑✓ • Service - Winj ❑ Single Zone Coalbed Gas ❑ Gas Hydrates ❑ Redrill [ t Reentry ❑ Exploratory - Oil ❑ Development -Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 59-52-180 CRU CD5-99A 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 27000 TVD: 7674 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 287' FNL, 2421' FEL, Sec. 18, T11 N, R4E, UM ASRC-NPR2, ASRC-NPR4, ADL387208, ADL387209 Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1050' FNL, 2508' FEL, Sec. 21, T11N, R4E, UM 932128, 932669, 932193, 932195 9/20/2016 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 656' FNL, 1731' FEL, Sec. 34, T11 N, R4E, UM 8838, 5032, 1146, 640 1731' - 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.2 15. Distance to Nearest Well Open Surface: x- 349559 - y- 5965921 Zone- 4 GL Elevation above MSL (ft): 33.9 Ito Same Pool: 1352' 16. Deviated wells: Kickoff depth: it, rl i 50b feet z4> 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 90 deglrX Downhole: 3754` ' Surface: 2986 . 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 80 36 36 116 116 10 yds. 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2337 36 36 2337 2185 288bbl 11.0ppg, 51 bbl 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7 L-80 H-563/BTC 16126 36 36 16126 7605 190 bbl 15.8 Class G 6-3/4" 4-1/2" 12.6 L-80 TXP 11834 15166 7485 27000 7674 n/a - uncemented liner with frac sleeves 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural 80.00 20" 10 yrds 116 116 Surface 2,337.00 10-3/4" 288bbl 11.0ppg, 51 bbl 15.8ppg 2337 2180 Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Time v. Depth PlotEl/r Shallow Hazard Analysis El Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program [ �.i(,' 20 AAC 25.050 requirements❑✓ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not David Lee 263-3741 be deviated from without prior written approval. Contact David. L. Lee(a�cop.com Email Printed Name Chip Alvord Title Drilling Manager Signature _ Phone 265-6120 Date r I2 p Commission Use Only Permit to Drill / L� API Number: , / / "��i7`7�`"�l Permit Approval See cover letter for other requirements. Number: '`'� 50-/rj Date: O Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane gas hydrates, or gas contained in shales: Other: HOP t zf.5t -�-o 35012p.!5) req'd: Yes ❑ No [� Mud log req'd: Yes ❑ No Q �{ q,S�a,�mples l4!/t (� �Ct V {tet' VG l� ��(� 5 �b z �r 5i, measures: Yes ® No ❑ Directional svy req'd: Yes [�c No ❑ Spacing exception req'd: Yes ❑ No Inclination -only svy req'd: Yes E]No [-11 d c$L rr' (i / Ytd Post initial injection MIT req'd: Yes ❑ No ❑ fo r of turn r-61 1,5a z- j APPROVED BY Date: 20 Approved by.P46412�71---- COMMISSIONER THE COMMISSION 1/`7-Z- ` 12-ql % Submit Form and Form 10-401 (Revised 11/2015) This permit is valid Iteri-MAeLf pproval (20 AAC 25.005(g)) Attachm is in Duplicate ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 September 19, 2016 Alaska Oil and Gas Conservation Commission 333 West 711' Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-99A Dear Sir or Madam: ConocoPhillips ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig Doyon 19. The intended spud date for this well is 9/20/16. CRU CD5-99A is planned to be an Alpine A and C dual lateral producer, with the Alpine C lateral covered in the CD5-99AL1 PTD. The 13-1/2" surface hole will TD above the C-30 sand and then 10-3/4" casing will be set and cemented to surface. The intermediate section will be drilled with a 9-7/8" x 11" underreamer BHA and Managed Pressure Drilling technology. This hole will be subsequently cased with a 7-5/8" casing string to surface and cemented to 500' above the uppermost hydrocarbon bearing interval. The suface by intermediate casing annulus will then be evaluated for future annular disposal by performing a leak -off test. The 6-3/4" production section will then be horizontally drilled and completed as a producer in the Alpine A reservoir. This lateral will be completed with a 4-1/2" solid liner with frac ports across the productive zone. A second lateral, CD5-99AL1, will then be drilled in the Alpine C sand. The L1 lateral and upper completion is covered in the L1 PTD application. It is the intention of ConocoPhillips to hydryallically fracture the CD5-99A Alpine A sand at a later date. Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact David Lee at 263-3741 (David. L.Lee(&cop.com) or Chip Alvord at 265-6120. Sincerely, % } 1 cc: CD5-99 Well File / Ann Haggerty -Sherrod Johnson Njoku Chip Alvord ATO 1530 ATO 1720 ATO 1570 David Lee Jason McLennan ATO 1712 Drilling Engineer Lanston Chin Kuukpik Corp Applicat, ,r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 CD5-99A Application for Permit to Drill Document cap«ow,�n�� Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (fl)............................................................ 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................ 3 Requirementsof 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (c)(4)) ........................ 4 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 (c) (5))......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) .......... 5 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) ......................... 5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .................................... 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) ......................................... 7 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) ........................ 7 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) ...................................7 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) .........................7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 8 (Requirements of 20 AAC 25.005 (c) (14))............................................................................. 8 15. Attachments............................................................................................................... 9 Attachment I Cement Summary................................................................................................................. 9 CD5-99A APD Page 1 of 15 Printed. 19 -Sep -16 Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic....... Attachment 4 Directional Plan ............... Applicati r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 CD5-99A APD Page 2 of 15 Printed: 19 -Sep -16 Applicati, r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 1. Well Name (Requirements of 20 AAC 25.005 ()9) The well for which this application is submitted will be designated as CRU CD5-99A. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) Location at Surface 287' FNL, 2421' FEL, Sec. 18, TI IN, R4E, UM NAD 1927 RKB Elevation 70.2' AMSL Northings: 5,965,921 Eastings: 349,559 Pad Elevation 33.9' AMSL Top of Productive Horizon (Heel) 1050' FNL, 2508' FEL, Sec. 21, TI IN, R4E, UM NAD 1927 Northings: 5,959,677 Eastings: 359,931 Measured Depth, RKB: 15,066' Total Vertical Depth, RKB: 7,468' Total Vertical Depth, SS: 7,398' Total Depth (Toe) 656' FNL, 1731 FEL, Sec. 34, TI IN, R4E, UM NAD 1927 Measured Depth, RKB: 27,000' Northings: 5,949,402 Total Vertical Depth, RKB: 7,674' Eastings: 365,822 Total Vertical Depth, SS: 7,603' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19. CD5-99A APD Page 3 of 15 Printed. 19 -Sep -16 Applicat x Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 4. Drilling Hazards Information (Requirements of20 AAC 25.005 (c)(4)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size in Csg Setting Depth MD/TVD ft Fracture Gradient Pore pressure si ASP Drilling si 20 116/116 10.9 52 54 10.75 2,337/2,185 14.5 977 1,429 7.625 16,146 / 7,607 12.5 3,714 2 986 4.5 27,000 / 7,674 12.5 3,754 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP= [(FG x 0.052) - o.1]*D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP = FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS Drilling below 20" conductor ASP = [(FG x 0.052) - 0.1] D _ [(10.9 x 0.052) - 0.1 ] x 116 = 54 psi OR ASP = FPP - (0.1 x D) = 977 - (0.1 x 2185') = 759 psi 2. Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.1 ] D = [(14.5 x 0.052) - 0.1 ] x 2185' = 1429 psi OR ASP = FPP - (0.1 x D) = 3714 - (0.1 x 7607') = 2954 psi Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1 ] D _ [(12.5 x 0.052) - 0.1 ] x 7674 = 4225 psi OR ASP = FPP - (0.1 x D) = 3754- (0.1 x 7674') = 2986 psi (B) data on potential gas zones; CD5-99A APD Page 4 of 15 Printed: 19 -Sep -16 Applicat >r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20 AAC 25.005 (c)(s)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing Program Csg/Tbg Hole Siz,� weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program OD (in) (Iblft) (ft) (ft) (ft) 20 42 94 H-40 Welded 80 36/36 116/116 Previously Installed HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,337 36/36 2,337/ 2,185 288 bbl DeepCrete Lead 11.0 ppg, BTCM 51 bbl Class G Tail Slurry 15.8 ppg 7-5/8 X115 29.7 L-80 63DX 16,126 36 /36 16,126 / 7,605 190 bbl Class G at 15.8 ppg BTCM 4-1/2 6.75 12.6 L-80 TXP 11,834 15,166 / 7,485 27,000 / 7,674 N/A — uncemented liner with frac sleeves 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, fourteen penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. CD5-99A APD Page 5 of 15 Printed: 19 -Sep -16 Applicat )r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 8. Drilling Fluid Program (Requirements of20AAC25.005(x)(8)) Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight <10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 ppg before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with an oil based mud drill -in fluid (Versapro) weighted to 9.5 ppg utilizing a 80:20 Oil Water Ratio and calcium carbonate. LVT-200 will be used as the base oil and CaC12 brine, 33% by weight for the water phasea Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-99A APD Page 6 of 15 Printed: 19 -Sep -16 Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.75 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0-10.0 • 9.6-11.1 9.5 PV CP ALAP ALAP 15-22 YP Ib./100 ftz 30-50 20-26 10-15 Initial Gels Ib./100 ftz 50 8-15 9-12 10 Minute Gels Ib./100 ftz 60 <20 12-18 API Fluid Loss cc/30 min. N.C. — 10.0 <10 <10 HPHT Fluid Loss cc/30 min. n/a <10 <5 pH 11.0 9.5-10.0 N/A Surface Hole: A mixed -metal oxide fresh water drilling fluid (Drilplex) will be used for the surface interval. Keep flow line viscosity at ± 200 sec/qt while drilling and running casing. Reduce viscosity prior to cementing. Maintain mud weight <10.0 ppg by use of solids control system and dilutions where necessary. Intermediate #1: Fresh water polymer mud system. Ensure good hole cleaning by pumping regular sweeps and maximizing fluid annular velocity. There is a slight potential for lost circulation, particularly after the reservoir is penetrated. Maintain mud weight at or below 9.6 ppg and be prepared to add loss circulation material. Good filter cake quality, hole cleaning and maintenance of low drill solids (by diluting as required) will all be important in maintaining wellbore stability. The mud will be weighted up to 11.1 ppg before pulling out of the hole. Note: Managed Pressure Drilling (MPD) will be utilized for adding backpressure during connections to mitigate shale instability and cycling. Production Hole: The horizontal production interval will be drilled with an oil based mud drill -in fluid (Versapro) weighted to 9.5 ppg utilizing a 80:20 Oil Water Ratio and calcium carbonate. LVT-200 will be used as the base oil and CaC12 brine, 33% by weight for the water phasea Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-99A APD Page 6 of 15 Printed: 19 -Sep -16 Applicat )r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 9. Abnormally Pressured Formation Information (Requirements of20 AAC 25.005 (c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of20 AAC 25.005 (x)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of20 AAC 25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of20AAC 25.005 (c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. Kick off abandonment kick off plug at 11,100'. 2. Drill 9-7/8" x 11" hole to section TD using Managed Pressure Drilling to maintain constant bottom hole pressure on connections (LWD Program: GR/Res). 3. Change out upper pipe rams to 7-5/8" solid bodies and test same to 3,500 psi. 4. Run 7-5/8" casing and cement to 500' above hydrocarbon bearing zones (cementing schematic attached). 5. Change upper pipe rams to 3-1/2" x 6" VBRs. 6. Test BOPE to 250 psi low / 3,500 psi high (24 hr. AOGCC notice). 7. Pick up and run in hole with 6-3/4" drilling BHA. 8. Chart casing pressure test to 3500 psi for 30 minutes. 9. Drill out shoe track and 20 feet of new formation. Perform LOT to a maximum of 16.0 ppg. Minimum required leak -off value is 11.0 ppg EMW. 10. Drill 6-3/4" hole to section TD (LWD Program: GR/RES). . 11. Pull out of hole with drilling BHA. 12. Run in hole with 4.5" Alpine A sand lower completion (uncemented liner with frac sleeves) 13. Set liner hanger and release from liner. Set liner top packer. 14. Run and set whipstock for kickoff in the Alpine C Sand. 15. Mill window and at least 20 feet of new formation. 16. Perform LOT to a maximum of 16.0 ppg. Minimum required to drill ahead is 11.0 ppg EMW. 17. POOH and lay down milling BHA. 18. End PTD for CD5-99A and begin PTD for CD5-99AL1. CD5-99A APD Page 7 of 15 Printed: 19 -Sep -16 Applicatit r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CD5-99A will be injected into a permitted surface casing x production casing annulus on CD5. The CD5-99A surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre -drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir. Once CD5-99A has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi _ (12.0 ppg) * (0.052) * (2,185') + 1,500 psi = 2863 psi Pore Pressure = 977 psi Therefore Differential = 2863 — 977 = 1886 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85% of Burst 85% of (ppf) Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi CD5-99A APD Page 8 of 15 Printed: 19 -Sep -16 15. Attachments Attachment I Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan Applicati r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 CD5-99A APD Page 9 of 15 Printed: 19 -Sep -16 Applicatic Attachment 1 — Cement Summary CD5-99A Cementing Program: CD5-99A_wp19 Schematic K2 - Qannik 6, 928' MD / 4, 026' TVD ........................................ 9-7/8" x 11" Hole Kuparuk C 14,379' MD / 7,277' TVD Alpine C 15,066,' MD / 7,468' TVD ..................................... Alpine A 16,000' MD / 7,594' TVD r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 20" 94# H-40 Welded Conductor to 116' ._ ..................I............ 10-3/4" 45.5# L-80 HYD563/BTCM 2,337' MD / 2,185' TVD @ 45° inc. , .............................................. Top of Cement ..............6, 428'.MD........ . HES Cementer 7, 200' MD..4,127 TVD Top of Cement 13.,879'.MD./.7,034'. TVD 7-5/8" 29.7 L-80 HYD563 X BTCM Casing 16,126' MD / 7,605' TVD @ 86- . ............................... � I � I I � � I i I 6-3/4" Hole i_____ i...27,000'.MD_/7,674.@.90°. CD5-99A APD Page 10 of 15 Printed: 19 -Sep -16 Applicatic Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 10.75" Surface Casing run to 2,337' MD / 2,185' TVD Cement from 2337' MD to 1837'(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1837' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1335' MD), zero excess in 20" conductor. Lead slurry from 1,851' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (116'- 3Q X 1.3645 ft3/ft X 1.0 (0% excess) = 109 ft3 Permafrost to Conductor (1,335'- 116 X 0.3637 ft3/ft X 3.5 (250% excess) = 1,552 ft3 Top of Tail to Permafrost (1,837'- 1,335) X 0.3637 ft3/ft X 1.5 (50% excess) = 274 ft3 Total Volume = 109 + 1,552 + 274 = 1,943 ft3 => 1003 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk Tail slurry from 2,337' MD to 1,837' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,337'-1,837) X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3 Shoe Joint (80) X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 16,126' MD / 7,605' TVD Top of slurry is designed to be at 13,879' MD, which is 500' above the Kuparuk C. Assume 40% excess annular volume. *I F Under reamer is 120' above the 9-7/8" bit. Tail slurry from 16,126' MD to 13,879' MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8" Hole (16,126'- 16,006 X 0.2148 ft3/ft X 1.40 (40% excess) = 36 ft3 11" Hole to Top of Cement (16,006'- , 13,879 X 0.3428 ft3/ft X 1.40 (40% excess) = 1021 ft Shoe Joint (80� X 0.2578 ft3/ft X 1.0 (0% excess) = 21 ft3 Total Volume = 36+ 1021 + 21 = 1078 ft3 => 921 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk Second Stage from 7,200'MD to 6,428'MD with 15.8 ppg Class G + additives 772'MD Across Qannik (7,200'- 6,428) X 0.3428 ft3ltt X 1.40 (40% excess) = 370 ft3 Tota/ Volume = 370 ft3 => 320 sx of 15.8 ppg Class G + a2% D046 antifoamer, a31Yo D065 dispersant and 0.8% 5002 accelerator @ 1.16 ft3/sk CD5-99A APD Page 11 of 15 Printed. 19 -Sep -16 Applicatic Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 13-1/2" Hole / 10-3/4" Casing Interval Event Risk Level I Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gyro single shots, traveling cylinder diagrams Monitor well at base of permafrost, increased mud weight, decreased Gas Hydrates Low mud viscosity, increased circulating times, controlled drilling rates, Abnormal Reservoir Pressure Low low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use Hydrogen Sulfide gas Low weighted sweeps. Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of low density cement slurries 9-7/8" x 11" Hole / 7-5/8" Casing Interval Event Risk Level —Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. No mapped faults occur Hydrogen Sulfide gas Low across the path of the planned wellbore. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-3/4" Open Hole Production Interval Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on trips Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. -- Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers CD5-99A APD Page 12 of 15 Printed. 19 -Sep -16 Applicati rr Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-99A APD Page 13 of 15 Printed: 19 -Sep -16 Applicati r Permit to Drill, Well CRU CD5-99A Saved: 19 -Sep -16 Attachment 3 — Completion Schematic (includes Alpine C lateral, as detailed in CD5-99AL1 PTD) CD5 — 99A Alpine A/C Dual Lateral Producer Proposed Schematic 7 5/8" 29.7# L-80 Hyd 563 x BTC Intermediate Casing at 16,126' C sand Lateral MD 6 3/4" Hole TD 15,066'— 27, 000' M D -----------------------------------------4 i 4-'/:" 12.6# L-80 TXP Liner w/ perf pups i o 0 0 0 0 0 0 0 0 0 0 0 I Production Packer at / 14,617' MD __.--- ..__---_--__- ---- — — — — — — — — — — — — — — — — ---------- CMU Sliding sleeve 4-%" 12.6# L-80 TXP Liner w/ frac ports for Selectivity o 0 0 0 0 0 0 0 0 0 0 • 14,650' 3-1/2" 9.3#TN110SS = :r. -------------------------J Production Packer at 6 3/4" Hole TD 15,102' MD ZXP liner top packer (whipstock 16,126'- 27, 000' MD base) at 15,166 MD Mirage Plug 15,140' CD5-99A APD Page 14 of 15 Printed: 19 -Sep -16 20" 94# H40 Welded Upper Completion: Conductor to 116' MD 1) 3-1/2" 9.3#/ft eue8rd 2) Shallow X nipple profile 2.813" ID 3) 3-1/2" x 1" Camco KBMG GLM (xx°) w/DCK2 pinned for 2500 psi casing to tbg shear 4) TNT Packer 5) CMU sliding sleeve 6) X Nipple profile, 2.813" 7) TNT Packer 10-3/4" 45.5# L-80 HYD 563 8) XN Nipple profile, 2.813" x BTC 9) Mirage Plug Surface Casing at 2,337' MD Lower Completion: 7) Plop and drop liner in C sand no junction -4.5" 12.6# L-80 w/ pert pups 8) ZXP liner top packer & Flexlock Liner Hanger XO 5" Hydril 521 Box 4-Yz" IBTM pin 4.5" 12.6# L-80 w/ Frac Ports 3-1/2" 9.3# L-80 eue8rd 7 5/8" 29.7# L-80 Hyd 563 x BTC Intermediate Casing at 16,126' C sand Lateral MD 6 3/4" Hole TD 15,066'— 27, 000' M D -----------------------------------------4 i 4-'/:" 12.6# L-80 TXP Liner w/ perf pups i o 0 0 0 0 0 0 0 0 0 0 0 I Production Packer at / 14,617' MD __.--- ..__---_--__- ---- — — — — — — — — — — — — — — — — ---------- CMU Sliding sleeve 4-%" 12.6# L-80 TXP Liner w/ frac ports for Selectivity o 0 0 0 0 0 0 0 0 0 0 • 14,650' 3-1/2" 9.3#TN110SS = :r. -------------------------J Production Packer at 6 3/4" Hole TD 15,102' MD ZXP liner top packer (whipstock 16,126'- 27, 000' MD base) at 15,166 MD Mirage Plug 15,140' CD5-99A APD Page 14 of 15 Printed: 19 -Sep -16 CD5-99Awpl 9 C30 HRZ (FCS) HRZKalubik (Base HRZ) 20 K2 K2 Basal Albian 93 r ' Alpine- Kuparuk C a 5 -� -- C10 i Albian 9� + LCU / Miluve h 5 C 0 d I K313asal Mbr Albian 5 i rr ,-�/' J AIPme-C I K1' 3 4 + Albian 9$ t 1 = - UJU =r ® d I I i1 r Albian 9`7, �' _ _ _ _ _ _ -Alpine B3 - ------ - Alpine B4 0- 0 0 10 3/4" z 13-112 000 12000 18000 24000 Measured Depth 7-5/8 X 9-7J8 by 11 0 0° 10-314" x 13-12' 0 00- o Depth Reference: CD5-99: 33.9+36.55 70.45usft (Coyon 19) Rig: Coyon 19 Start 31100' DLS, 180' TF, for 299.82' 2318.4 SURVEY PROGRAM SECTION DETAILS 000 0000 000 0 7-5/8" X 9-7/8" by 11" 41/2" x 6-314" o +W -S d 0 CD5-99 Srvy 1 - SLBGYD-GC-SS (Rig: CD5-99)GYD-GC-SS Pad Elevation: 33.90 ^ry �40o poo o 0 0 0 0 0 0 0 0 0 2270.51 CD5-99 Srvy 2 - SLB__MWD_GMAG (fi . OW-WK-CAZ-SC -4299.65 7507.16 0 2500 5000 7500 10000 12500 15000 17500 20000 22500 250( Horizontal Departure 270 7"' I Plan Summary O W 180 011111 11111 - 1130 11300 - 1148 11480 - 1166 11660 - 1185 11850 - 1203 12030 - 1222 12220 - 1240 12400 - 1301 13010 1363 13630 - 1424 14240 - 1485 14850 - 1546 15460 - 1607 16070 - 1669 16690 - 1730 17300 - 1851 18510 - 1973 19730 "- 2094 20940 - 2215 22150 - 2336 23360 2457 24570 257 25790 - 2700 Magnetic Model: BGGM2016 T Magnetic Model Date: 25 -Aug -16 Magnetic Declination: 17.56' P To convert a Magnetic Direction to a True Drection, Add 17.58° East Annotation 0 4000 8000 12000 16000 20000 24000 Z4O Start 31100' DLS, 180' TF, for 299.82' 2318.4 SURVEY PROGRAM SECTION DETAILS epth From Depth To Survey/Plan Tool TVD +W -S 100.00 500.00 CD5-99 Srvy 1 - SLBGYD-GC-SS (Rig: CD5-99)GYD-GC-SS Pad Elevation: 33.90 1 11111.00 572.96 2270.51 CD5-99 Srvy 2 - SLB__MWD_GMAG (fi . OW-WK-CAZ-SC -4299.65 7507.16 2360.53 11111.00 CD5-99 Srvy 3 - SLB_MWD+GMAG (WVDUFR%K-CAZ-SC 2 11141.00 66.99 11111.00 12611.00 CD5-99Awp19 (Plan: CD5-99A) MWD CASING DETAILS 11111.00 16126.35 CD5-99Awp19 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC TVD MD Name 16126.35 17626.35 CD5-99Awp19 (Plan: CD5-99A) MWD 7605.45 16126.35 7-5/8" X 9-7/8" by 11" 16126.35 27000.00 CD5-99Awp19 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 7673.72 27000.00 4-1/2"x6-3/4" 180 011111 11111 - 1130 11300 - 1148 11480 - 1166 11660 - 1185 11850 - 1203 12030 - 1222 12220 - 1240 12400 - 1301 13010 1363 13630 - 1424 14240 - 1485 14850 - 1546 15460 - 1607 16070 - 1669 16690 - 1730 17300 - 1851 18510 - 1973 19730 "- 2094 20940 - 2215 22150 - 2336 23360 2457 24570 257 25790 - 2700 Magnetic Model: BGGM2016 T Magnetic Model Date: 25 -Aug -16 Magnetic Declination: 17.56' P To convert a Magnetic Direction to a True Drection, Add 17.58° East Annotation 2083 22 KOP: 4°/100' DLS, 150° TF, for 30' C3 0 Start 31100' DLS, 180' TF, for 299.82' 2318.4 Hold for 2715' SECTION DETAILS Sec MD Inc Azi TVD +W -S +E/ -W Dleg TFace VSect Target 1 11111.00 68.03 118.09 5581.48 -4299.65 7507.16 0.00 0.00 7320.77 TD: 27000' MD, 7673.72' TVD 2 11141.00 66.99 118.74 5592.96 -4312.84 7531.54 4.00 150.00 7343.86 3 11440.82 68.00 118.74 5731.27 -4440.57 7764.48 3.00 180.00 7565.99 4 14155.82 58.00 118.74 7170.00 -5547.60 9783.34 0.00 0.00 9491.23 5 14922.26 80.00 126.00 7443.30 -5930.84 10381.68 3.00 18.5810110.53 6 15210.20 80.00 126.00 7493.30 -6097.52 10611.09 0.00 0.0010365.39 7 16126.35 86.00 140.00 7605.45 -6716.33 11273.63 1.65 67.6211222.81 8 16146.35 86.00 140.00 7606.85 -6731.61 11286.45 0.00 0.0011242.33 9 16251.2189.67 140.00 7610.81 -6811.87 11353.80 3.50 0.0011344.80 10 16451.21 89.67 140.00 7611.96 -6965.07 11482.35 0.00 0.0011540.43 11 17016.72 89.66 151.31 7615.25 -7431.23 11800.87 2.00 90.0812101.56 12 24392.96 89.66 151.31 7658.45 -13901.80 15341.87 0.00 0.0019477.13 CD5-99 02.Toe 041416 JD 13 27000.00 89.66 151.31 7673.72 -16188.75 16593.40 0.00 0.00 22083.94 180 011111 11111 - 1130 11300 - 1148 11480 - 1166 11660 - 1185 11850 - 1203 12030 - 1222 12220 - 1240 12400 - 1301 13010 1363 13630 - 1424 14240 - 1485 14850 - 1546 15460 - 1607 16070 - 1669 16690 - 1730 17300 - 1851 18510 - 1973 19730 "- 2094 20940 - 2215 22150 - 2336 23360 2457 24570 257 25790 - 2700 Magnetic Model: BGGM2016 T Magnetic Model Date: 25 -Aug -16 Magnetic Declination: 17.56' P To convert a Magnetic Direction to a True Drection, Add 17.58° East Annotation 2083 22 KOP: 4°/100' DLS, 150° TF, for 30' C3 0 Start 31100' DLS, 180' TF, for 299.82' 2318.4 Hold for 2715' C30 Start 3°/100' DLS, 18.58' TF, for 766.44' 263 2 Hold for 287.94' 2856. Start 1.65°/100' OILS, 67.62° TF, for 916.15' Hold for 20' Start 3.5°/100' DLS, 0' TF, for 104.86' C10 Hold for 200' Start 2'/100' DLS, 90.06' TF, for 565.51' Hold for 7376.24' 3794.3 Adjust TF to 0°, for 2607.04'asal Mbr TD: 27000' MD, 7673.72' TVD K2 Basal 5074.2 Albian 97 5930.6 Albian 96 Alpine B3 By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position and I approve the scan and oollision Avoid a= plilo 06 Sal Q111 ja the midit park I approve it ng thp hasiq for the final weli plan and wall,;O drawinm I On anknowled- that unl�- nntified 4 arwi.- .11 f.mon Ova, A InO feet lAtpral toler Prepared by: Dlgttallysignedbyl9ij Checked by: Accepted by: I Approved by: Hall-Potnis david.l.lee@cono Date: 2016.09.19 cophillips.com Brij Potnis Nate Beck Erik Sterk David Lee 11:37, September 19 201 c_ 0 0 N CD5-315PB1 t z D5 -06L1 \CD5 CD5-11 M A A CD5-313P CD5-313 Easting (2500 usft/in) vT vCD2-56 C D 5-01 CD2 -43 CD2 -56L1 CD4 -16 CD4 -3 CD5-05 t CD4 -05 C 4-17 CD4 -26 Rig: CD5-�9 4-321 CD4-304FU1 CD4 -31 CDS CD4 -25 CD4;4-3182 1 31 D5-17L1wp\CD5-19OMIMD) 5-17wp CD5-99Awp 93 (5D) CD5-181 PO(6'WD) Easting (2500 usft/in) 1 VVD2-47 CD2 -36P CD2 -36 c++ z 0 s C t -f gi "PMB CD4CD4-�3CD4 9CD4-93A 1 7 CD5-99Awp19 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. 00 000 � 000 00 M �ry M -5000 ^moo o° U o h 7-5/8" X 9-7/8" by 11 -7500 CD5-99 01.Heel 091616 D CD5-99 Polygon 091616 P 1900° \g GO 210000 \ 2°000 0 2000 cr) 0 2200 -125007 230 � ' D5-99 02.Toe 041416 D - _ _ 9 ZOOo G�6 -150 00 26000 4-1 /2" x 6-3/4--------- Zil 7500 10000 12500 15000 17500 20000 22500 25000 West( -)/East(+) CD5-99Awpl9 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. -3900 0 00 00 -4550 0 .`y 00 �o -5200 00 \ �o Z°5850 o0 o � nC' 0 U) -6500 oq 7-5/8" X 9-7/8" by 11"---,- CD5-99 01.Heel 091616 D -7150 G�59g 0 CD5-99 Polygon 091616 P � G�5 \ -7800 7150 7800 8450 9100 9750 10400 11050 11700 12350 West(-)/East(+) C D5-99Awp 19 Section View 0 5400 0 7 Albian 96 / 5850 00 Albian 95 Albian 94 6300 Albian 93 CL � HRZ (FCS 0 Kai ik (Base HRZ) U 6750 Kuparuk C m LCU / Miluveac ' , Alpine CL -' Alpine C UJULO rn 7200 - - -- - .- ;= o -' ,- Alpine B4 ' U Q ' Alpine B3 o a o o - -- N-- - _ __ -��I - M - d _ o -© = CO7650- C _- N- N 7-5/8" X 9-7/8" by 11" ✓ -b 4-1/2" x 6-3/4" CO 11-( 8000 10000 12000 14000 000 18000 2 00 00 22000 Vertical Section at 12.00° CD5-99Awp19 Section View 7370— Alpine Alpine C 7425— C) C:) UJU .. ... . . .... ... ... ... ... . . . ... .... . ... ... . ... .. Alpine B4..... .. ... - 7480--- . . . . ... ... ... ... .... . . . ,. ... ... .... . . . -Alpine B3 75 7535— rn C) a)o C) C) U) CD 7590 0 0 L 7-5/8" X 9-7/8" by 11 7645- 7700 10000 10400 10800 11200 11600 12000 12400 12800 Vertical Section at 152.00' ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: C135-99 Plan: CD5-99A Plan: CD5-99Awp19 Standard Proposal Report 19 September, 2016 Database: EDM Production Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99A Design: CD5-99Awp19 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: SLB Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: From: Map Position Uncertainty: 0.00 usft Slot Radius: 13-3/16" Well Rig CD5-99 Well Position +N/ -S 0.00 usft +E/ -W 0.00 usft Position Uncertainty 0.00 usft Ground Level: 33.90 usft Wellbore Plan: CD5-99A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 8/25/2016 17.58 80.82 57,511 [Auditesign CD5-99Awpl9 Notes:ersion: Phase: PLAN Tie On Depth: 11,111.00 ��Verticaln: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 36.55 0.00 0.00 152.00 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/ -S +E/ -W Rate Rate Rate Tool Face (usft) (°) (°) (usft) usft (usft) (usft) (°1100usft) (°1100usft) (°/100usft) (°) 11,111.00 68.03 118.09 5,581.48 5,511.03 -4,299.65 7,507.16 0.00 0.00 0.00 0.00 11,141.00 66.99 118.74 5,592.96 5,522.51 -4,312.84 7,531.54 4.00 -3.46 2.17 150.00 11,440.82 58.00 118.74 5,731.27 5,660.82 -4,440.57 7,764.48 3.00 -3.00 0.00 180.00 14,155.82 58.00 118.74 7,170.00 7,099.55 -5,547.60 9,783.34 0.00 0.00 0.00 0.00 14,922.26 80.00 126.00 7,443.30 7,372.85 -5,930.84 10,381.68 3.00 2.87 0.95 18.58 15,210.20 80.00 126.00 7,493.30 7,422.85 -6,097.52 10,611.09 0.00 0.00 0.00 0.00 16,126.35 86.00 140.00 7,605.45 7,535.00 -6,716.33 11,273.63 1.65 0.65 1.53 67.62 16,146.35 86.00 140.00 7,606.85 7,536.40 -6,731.61 11,286.45 0.00 0.00 0.00 0.00 16,251.21 89.67 140.00 7,610.81 7,540.36 -6,811.87 11,353.80 3.50 3.50 0.00 0.00 16,451.21 89.67 140.00 7,611.96 7,541.51 -6,965.07 11,482.35 0.00 0.00 0.00 0.00 17,016.72 89.66 151.31 7,615.25 7,544.80 -7,431.23 11,800.87 2.00 0.00 2.00 90.06 24,392.96 89.66 151.31 7,658.45 7,588.00 -13,901.80 15,341.87 0.00 0.00 0.00 0.00 27,000.00 89.66 151.31 7,673.72 7,603.27 -16,188.75 16,593.40 0.00 0.00 0.00 0.00 9/19/2016 11:22:01AM Page 2 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: Conoco Phillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A DLS Vert Section Design: CD5-99Awp19 (1) (usft) Planned Survey =Vertical Measured Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W DLS Vert Section (usft) (^) (1) (usft) usft (usft) (usft) 5,511.03 11,111.00 t, 68.03 118.09 5,581.48 5,511.03 -4,299.65 7,507.16 0.75 7,320.77 KOP: 4°/100' DLS, 150° TF, for 30' 11,141.00 66.99 118.74 5,592.96 5,522.51 -4,312.84 7,531.54 4.00 7,343.86 Start 3°1100' DLS, 180° TF, for 299.82' 11,200.00 65.22 118.74 5,616.85 5,546.40 -4,338.77 7,578.84 3.00 7,388.96 11,300.00 62.22 118.74 5,661.11 5,590.66 -4,381.88 7,657.46 3.00 7,463.93 11,400.00 59.22 118.74 5,710.01 5,639.56 -4,423.82 7,733.93 3.00 7,536.86 11,440.82 58.00 118.74 5,731.27 5,660.82 -4,440.57 7,764.48 3.00 7,565.99 Hold for 2715' 11,500.00 58.00 118.74 5,762.63 5,692.18 -4,464.70 7,808.49 0.00 7,607.96 11,600.00 58.00 118.74 5,815.62 5,745.17 -4,505.48 7,882.85 0.00 7,678.87 11,700.00 58.00 118.74 5,868.61 5,798.16 -4,546.25 7,957.21 0.00 7,749.78 11,800.00 58.00 118.74 5,921.60 5,851.15 -4,587.02 8,031.57 0.00 7,820.70 11,817.05 58.00 118.74 5,930.64 5,860.19 -4,593.98 8,044.25 0.00 7,832.79 Albian 96 11,900.00 58.00 118.74 5,974.60 5,904.15 -4,627.80 8,105.93 0.00 7,891.61 12,000.00 58.00 118.74 6,027.59 5,957.14 -4,668.57 8,180.29 0.00 7,962.52 12,100.00 58.00 118.74 6,080.58 6,010.13 -4,709.35 8,254.65 0.00 8,033.43 12,200.00 58.00 118.74 6,133.57 6,063.12 -4,750.12 8,329.01 0.00 8,104.34 12,300.00 58.00 118.74 6,186.56 6,116.11 -4,790.90 8,403.36 0.00 8,175.25 12,400.00 58.00 118.74 6,239.56 6,169.11 -4,831.67 8,477.72 0.00 8,246.16 12,500.00 58.00 118.74 6,292.55 6,222.10 -4,872.45 8,552.08 0.00 8,317.07 12,600.00 58.00 118.74 6,345.54 6,275.09 -4,913.22 8,626.44 0.00 8,387.99 12,700.00 58.00 118.74 6,398.53 6,328.08 -4,953.99 8,700.80 0.00 8,458.90 12,800.00 58.00 118.74 6,451.52 6,381.07 -4,994.77 8,775.16 0.00 8,529.81 12,900.00 58.00 118.74 6,504.52 6,434.07 -5,035.54 8,849.52 0.00 8,600.72 13,000.00 58.00 118.74 6,557.51 6,487.06 -5,076.32 8,923.88 0.00 8,671.63 13,100.00 58.00 118.74 6,610.50 6,540.05 -5,117.09 8,998.24 0.00 8,742.54 13,163.88 58.00 118.74 6,644.35 6,573.90 -5,143.14 9,045.74 0.00 8,787.84 Albian 95 13,200.00 58.00 118.74 6,663.49 6,593.04 -5,157.87 9,072.60 0.00 8,813.45 13,300.00 58.00 118.74 6,716.48 6,646.03 -5,198.64 9,146.96 0.00 8,884.36 13,400.00 58.00 118.74 6,769.47 6,699.02 -5,239.42 9,221.32 0.00 8,955.28 13,500.00 58.00 118.74 6,822.47 6,752.02 -5,280.19 9,295.68 0.00 9,026.19 13,514.90 58.00 118.74 6,830.36 6,759.91 -5,286.26 9,306.75 0.00 9,036.75 Albian 94 13,600.00 58.00 118.74 6,875.46 6,805.01 -5,320.96 9,370.04 0.00 9,097.10 13,671.50 58.00 118.74 6,913.35 6,842.90 -5,350.12 9,423.21 0.00 9,147.80 Albian 93 13,700.00 58.00 118.74 6,928.45 6,858.00 -5,361.74 9,444.39 0.00 9,168.01 13,800.00 58.00 118.74 6,981.44 6,910.99 -5,402.51 9,518.75 0.00 9,238.92 13,828.83 58.00 118.74 6,996.72 6,926.27 -5,414.27 9,540.19 0.00 9,259.36 HRZ (FCS) 13,900.00 58.00 118.74 7,034.43 6,963.98 -5,443.29 9,593.11 0.00 9,309.83 9/19/2016 11:22:01AM Page 3 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A +N/ -S +E/ -W Design: CD5-99Awp19 (usft) V) Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W DLS Vert Section (usft) V) V) (usft) usft (usft) (usft) 6,992.95 13,954.66 58.00 118.74 7,063.40 6,992.95 -5,465.57 9,633.76 0.00 9,348.59 HRZ 14,000.00 58.00 118.74 7,087.43 7,016.98 -5,484.06 9,667.47 0.00 9,380.74 14,100.00 58.00 118.74 7,140.42 7,069.97 -5,524.84 9,741.83 0.00 9,451.65 14,154.20 58.00 118.74 7,169.14 7,098.69 -5,546.94 9,782.13 0.00 9,490.09 Kalubik (Base HRZ) 14,155.82 58.00 118.74 7,170.00 7,099.55 -5,547.60 9,783.34 0.00 9,491.23 Start 3°/100' DLS, 18.58° TF, for 766.44' 14,200.00 59.26 119.23 7,193.00 7,122.55 -5,565.88 9,816.34 3.00 9,522.87 14,300.00 62.11 120.30 7,241.95 7,171.50 -5,609.16 9,892.01 3.00 9,596.62 14,379.41 64.38 121.10 7,277.70 7,207.25 -5,645.37 9,952.98 3.00 9,657.21 Kuparuk C 14,396.05 64.86 121.27 7,284.83 7,214.38 -5,653.15 9,965.84 3.00 9,670.11 LCU / Miluveach 14,400.00 64.97 121.31 7,286.51 7,216.06 -5,655.01 9,968.90 3.00 9,673.19 14,500.00 67.84 122.27 7,326.53 7,256.08 -5,703.29 10,046.77 3.00 9,752.38 14,600.00 70.71 123.20 7,361.91 7,291.46 -5,753.87 10,125.43 3.00 9,833.97 14,700.00 73.59 124.10 7,392.55 7,322.10 -5,806.61 10,204.66 3.00 9,917.73 14,800.00 76.47 124.97 7,418.38 7,347.93 -5,861.37 10,284.24 3.00 10,003.44 14,900.00 79.36 125.81 7,439.31 7,368.86 -5,918.00 10,363.94 3.00 10,090.86 14,922.26 80.00 126.00 7,443.30 7,372.85 -5,930.84 10,381.68 3.00 10,110.53 Hold for 287.94' 15,000.00 80.00 126.00 7,456.80 7,386.35 -5,975.84 10,443.62 0.00 10,179.34 15,008.81 80.00 126.00 7,458.33 7,387.88 -5,980.95 10,450.64 0.00 10,187.14 Alpine 15,066.23 80.00 126.00 7,468.30 7,397.85 -6,014.18 10,496.38 0.00 10,237.96 Alpine C 15,100.00 80.00 126.00 7,474.16 7,403.71 -6,033.73 10,523.29 0.00 10,267.85 15,101.59 80.00 126.00 7,474.44 7,403.99 -6,034.65 10,524.55 0.00 10,269.26 UJU 15,200.00 80.00 126.00 7,491.53 7,421.08 -6,091.61 10,602.96 0.00 10,356.37 15,210.20 80.00 126.00 7,493.30 7,422.85 -6,097.52 10,611.09 0.00 10,365.39 Start 1.65°/100' DLS, 67.62° TF, for 916.15' 15,277.91 80.43 127.05 7,504.81 7,434.36 -6,137.23 10,664.71 1.65 10,425.63 Alpine B4 15,300.00 80.57 127.39 7,508.46 7,438.01 -6,150.41 10,682.06 1.65 10,445.41 15,400.00 81.21 128.93 7,524.30 7,453.85 -6,211.41 10,759.69 1.65 10,535.72 15,500.00 81.85 130.47 7,539.03 7,468.58 -6,274.59 10,835.78 1.65 10,627.23 15,598.37 82.49 131.98 7,552.43 7,481.98 -6,338.81 10,909.08 1.65 10,718.34 Alpine B3 15,600.00 82.50 132.00 7,552.64 7,482.19 -6,339.90 10,910.28 1.65 10,719.86 15,700.00 83.16 133.53 7,565.13 7,494.68 -6,407.26 10,983.12 1.65 10,813.54 15,800.00 83.82 135.05 7,576.47 7,506.02 -6,476.64 11,054.23 1.65 10,908.18 15,900.00 84.48 136.57 7,586.67 7,516.22 -6,547.97 11,123.57 1.65 11,003.71 16,000.00 85.15 138.09 7,595.70 7,525.25 -6,621.20 11,191.06 1.65 11,100.06 9/19/2016 11:22.'01AM Page 4 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A usft (usft) Design: CD5-99Awp19 16,100.00 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W DLS Vert Section (usft) (1) (�) (usft) usft (usft) (usft) 7,533.12 16,100.00 85.82 139.60 7,603.57 7,533.12 -6,696.25 11,256.67 1.65 11,197.13 16,126.35 86.00 140.00 7,605.45 7,535.00 -6,716.33 11,273.63 1.65 11,222.82 Hold for 20'- 7-5/8" X 9-7/8" by 11" 16,146.35 86.00 140.00 7,606.85 7,536.40 -6,731.61 11,286.45 0.00 11,242.33 Start 3.5°/100' DLS, 0° TF, for 104.86' 16,200.00 87.88 140.00 7,609.71 7,539.26 -6,772.65 11,320.89 3.50 11,294.73 16,251.21 89.67 140.00 7,610.81 7,540.36 -6,811.87 11,353.80 3.50 11,344.80 Hold for 200' 16,300.00 89.67 140.00 7,611.09 7,540.64 -6,849.24 11,385.16 0.00 11,392.53 16,400.00 89.67 140.00 7,611.66 7,541.21 -6,925.85 11,449.44 0.00 11,490.34 16,451.21 89.67 140.00 7,611.96 7,541.51 -6,965.07 11,482.35 0.00 11,540.43 Start 2°/100' DLS, 90.06° TF, for 565.51' 16,500.00 89.67 140.98 7,612.24 7,541.79 -7,002.72 11,513.39 2.00 11,588.24 16,600.00 89.67 142.98 7,612.82 7,542.37 -7,081.48 11,574.99 2.00 11,686.71 16,700.00 89.67 144.98 7,613.40 7,542.95 -7,162.36 11,633.80 2.00 11,785.72 16,800.00 89.67 146.98 7,613.98 7,543.53 -7,245.23 11,689.75 2.00 11,885.16 16,900.00 89.66 148.98 7,614.57 7,544.12 -7,330.01 11,742.77 2.00 11,984.91 17,000.00 89.66 150.98 7,615.15 7,544.70 -7,416.58 11,792.80 2.00 12,084.84 17,016.72 89.66 151.31 7,615.25 7,544.80 -7,431.23 11,800.87 2.00 12,101.56 Hold for 7376.24' 17,100.00 89.66 151.31 7,615.74 7,545.29 -7,504.28 11,840.85 0.00 12,184.83 17,200.00 89.66 151.31 7,616.33 7,545.88 -7,592.00 11,888.86 0.00 12,284.82 17,300.00 89.66 151.31 7,616.91 7,546.46 -7,679.73 11,936.86 0.00 12,384.81 17,400.00 89.66 151.31 7,617.50 7,547.05 -7,767.45 11,984.87 0.00 12,484.80 17,500.00 89.66 151.31 7,618.08 7,547.63 -7,855.17 12,032.88 0.00 12,584.80 17,600.00 89.66 151.31 7,618.67 7,548.22 -7,942.89 12,080.88 0.00 12,684.79 17,700.00 89.66 151.31 7,619.25 7,548.80 -8,030.61 12,128.89 0.00 12,784.78 17,800.00 89.66 151.31 7,619.84 7,549.39 -8,118.34 12,176.89 0.00 12,884.77 17,900.00 89.66 151.31 7,620.43 7,549.98 -8,206.06 12,224.90 0.00 12,984.76 18,000.00 89.66 151.31 7,621.01 7,550.56 -8,293.78 12,272.90 0.00 13,084.75 18,100.00 89.66 151.31 7,621.60 7,551.15 -8,381.50 12,320.91 0.00 13,184.74 18,200.00 89.66 151.31 7,622.18 7,551.73 -8,469.22 12,368.91 0.00 13,284.73 18,300.00 89.66 151.31 7,622.77 7,552.32 -8,556.94 12,416.92 0.00 13,384.72 18,400.00 89.66 151.31 7,623.35 7,552.90 -8,644.67 12,464.92 0.00 13,484.72 18,500.00 89.66 151.31 7,623.94 7,553.49 -8,732.39 12,512.93 0.00 13,584.71 18,600.00 89.66 151.31 7,624.52 7,554.07 -8,820.11 12,560.94 0.00 13,684.70 18,700.00 89.66 151.31 7,625.11 7,554.66 -8,907.83 12,608.94 0.00 13,784.69 18,800.00 89.66 151.31 7,625.70 7,555.25 -8,995.55 12,656.95 0.00 13,884.68 18,900.00 89.66 151.31 7,626.28 7,555.83 -9,083.28 12,704.95 0.00 13,984.67 19,000.00 89.66 151.31 7,626.87 7,556.42 -9,171.00 12,752.96 0.00 14,084.66 19,100.00 89.66 151.31 7,627.45 7,557.00 -9,258.72 12,800.96 0.00 14,184.65 19,200.00 89.66 151.31 7,628.04 7,557.59 -9,346.44 12,848.97 0.00 14,284.64 19,300.00 89.66 151.31 7,628.62 7,558.17 -9,434.16 12,896.97 0.00 14,384.63 19,400.00 89.66 151.31 7,629.21 7,558.76 -9,521.89 12,944.98 0.00 14,484.63 19,500.00 89.66 151.31 7,629.80 7,559.35 -9,609.61 12,992.99 0.00 14,584.62 9/19/2016 11:22.01AM Page 5 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A usft (usft) Design: CD5-99Awp19 19,600.00 Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W DLS Vert Section (usft) (usft) usft (usft) (usft) 7,559.93 19,600.00 89.66 151.31 7,630.38 7,559.93 -9,697.33 13,040.99 0.00 14,684.61 19,700.00 89.66 151.31 7,630.97 7,560.52 -9,785.05 13,089.00 0.00 14,784.60 19,800.00 89.66 151.31 7,631.55 7,561.10 -9,872.77 13,137.00 0.00 14,884.59 19,900.00 89.66 151.31 7,632.14 7,561.69 -9,960.49 13,185.01 0.00 14,984.58 20,000.00 89.66 151.31 7,632.72 7,562.27 -10,048.22 13,233.01 0.00 15,084.57 20,100.00 89.66 151.31 7,633.31 7,562.86 -10,135.94 13,281.02 0.00 15,184.56 20,200.00 89.66 151.31 7,633.89 7,563.44 -10,223.66 13,329.02 0.00 15,284.55 20,300.00 89.66 151.31 7,634.48 7,564.03 -10,311.38 13,377.03 0.00 15,384.55 20,400.00 89.66 151.31 7,635.07 7,564.62 -10,399.10 13,425.03 0.00 15,484.54 20,500.00 89.66 151.31 7,635.65 7,565.20 -10,486.83 13,473.04 0.00 15,584.53 20,600.00 89.66 151.31 7,636.24 7,565.79 -10,574.55 13,521.05 0.00 15,684.52 20,700.00 89.66 151.31 7,636.82 7,566.37 -10,662.27 13,569.05 0.00 15,784.51 20,800.00 89.66 151.31 7,637.41 7,566.96 -10,749.99 13,617.06 0.00 15,884.50 20,900.00 89.66 151.31 7,637.99 7,567.54 -10,837.71 13,665.06 0.00 15,984.49 21,000.00 89.66 151.31 7,638.58 7,568.13 -10,925.44 13,713.07 0.00 16,084.48 21,100.00 89.66 151.31 7,639.17 7,568.72 -11,013.16 13,761.07 0.00 16,184.47 21,200.00 89.66 151.31 7,639.75 7,569.30 -11,100.88 13,809.08 0.00 16,284.46 21,300.00 89.66 151.31 7,640.34 7,569.89 -11,188.60 13,857.08 0.00 16,384.46 21,400.00 89.66 151.31 7,640.92 7,570.47 -11,276.32 13,905.09 0.00 16,484.45 21,500.00 89.66 151.31 7,641.51 7,571.06 -11,364.04 13,953.10 0.00 16,584.44 21,600.00 89.66 151.31 7,642.09 7,571.64 -11,451.77 14,001.10 0.00 16,684.43 21,700.00 89.66 151.31 7,642.68 7,572.23 -11,539.49 14,049.11 0.00 16,784.42 21,800.00 89.66 151.31 7,643.26 7,572.81 -11,627.21 14,097.11 0.00 16,884.41 21,900.00 89.66 151.31 7,643.85 7,573.40 -11,714.93 14,145.12 0.00 16,984.40 22,000.00 89.66 151.31 7,644.44 7,573.99 -11,802.65 14,193.12 0.00 17,084.39 22,100.00 89.66 151.31 7,645.02 7,574.57 -11,890.38 14,241.13 0.00 17,184.38 22,200.00 89.66 151.31 7,645.61 7,575.16 -11,978.10 14,289.13 0.00 17,284.37 22,300.00 89.66 151.31 7,646.19 7,575.74 -12,065.82 14,337.14 0.00 17,384.37 22,400.00 89.66 151.31 7,646.78 7,576.33 -12,153.54 14,385.14 0.00 17,484.36 22,500.00 89.66 151.31 7,647.36 7,576.91 -12,241.26 14,433.15 0.00 17,584.35 22,600.00 89.66 151.31 7,647.95 7,577.50 -12,328.99 14,481.16 0.00 17,684.34 22,700.00 89.66 151.31 7,648.54 7,578.09 -12,416.71 14,529.16 0.00 17,784.33 22,800.00 89.66 151.31 7,649.12 7,578.67 -12,504.43 14,577.17 0.00 17,884.32 22,900.00 89.66 151.31 7,649.71 7,579.26 -12,592.15 14,625.17 0.00 17,984.31 23,000.00 89.66 151.31 7,650.29 7,579.84 -12,679.87 14,673.18 0.00 18,084.30 23,100.00 89.66 151.31 7,650.88 7,580.43 -12,767.60 14,721.18 0.00 18,184.29 23,200.00 89.66 151.31 7,651.46 7,581.01 -12,855.32 14,769.19 0.00 18,284.29 23,300.00 89.66 151.31 7,652.05 7,581.60 -12,943.04 14,817.19 0.00 18,384.28 23,400.00 89.66 151.31 7,652.63 7,582.18 -13,030.76 14,865.20 0.00 18,484.27 23,500.00 89.66 151.31 7,653.22 7,582.77 -13,118.48 14,913.21 0.00 18,584.26 23,600.00 89.66 151.31 7,653.81 7,583.36 -13,206.20 14,961.21 0.00 18,684.25 23,700.00 89.66 151.31 7,654.39 7,583.94 -13,293.93 15,009.22 0.00 18,784.24 23,800.00 89.66 151.31 7,654.98 7,584.53 -13,381.65 15,057.22 0.00 18,884.23 23,900.00 89.66 151.31 7,655.56 7,585.11 -13,469.37 15,105.23 0.00 18,984.22 24,000.00 89.66 151.31 7,656.15 7,585.70 -13,557.09 15,153.23 0.00 19,084.21 9/19/2016 11:22.01AM Page 6 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CDS Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A TVDss +Nl-S Design: CD5-99Awp19 Vert Section (usft) Planned Survey Measured Vertical Depth Inclination Azimuth Depth TVDss +Nl-S +E/ -W DLS Vert Section (usft) (') (1) (usft) usft (usft) (usft) 7,586.28 24,100.00 89.66 151.31 7,656.73 7,586.28 -13,644.81 15,201.24 0.00 19,184.20 24,200.00 89.66 151.31 7,657.32 7,586.87 -13,732.54 15,249.24 0.00 19,284.20 24,300.00 89.66 151.31 7,657.91 7,587.46 -13,820.26 15,297.25 0.00 19,384.19 24,392.96 89.66 151.31 7,658.45 7,588.00 -13,901.80 15,341.87 0.00 19,477.13 Adjust TF to 0°, for 2607.04' 24,400.00 89.66 151.31 7,658.49 7,588.04 -13,907.98 15,345.25 0.00 19,484.18 24,500.00 89.66 151.31 7,659.08 7,588.63 -13,995.70 15,393.26 0.00 19,584.17 24,600.00 89.66 151.31 7,659.66 7,589.21 -14,083.42 15,441.27 0.00 19,684.16 24,700.00 89.66 151.31 7,660.25 7,589.80 -14,171.15 15,489.27 0.00 19,784.15 24,800.00 89.66 151.31 7,660.83 7,590.38 -14,258.87 15,537.28 0.00 19,884.14 24,900.00 89.66 151.31 7,661.42 7,590.97 -14,346.59 15,585.28 0.00 19,984.13 25,000.00 89.66 151.31 7,662.01 7,591.56 -14,434.31 15,633.29 0.00 20,084.12 25,100.00 89.66 151.31 7,662.59 7,592.14 -14,522.03 15,681.29 0.00 20,184.12 25,200.00 89.66 151.31 7,663.18 7,592.73 -14,609.75 15,729.30 0.00 20,284.11 25,300.00 89.66 151.31 7,663.76 7,593.31 -14,697.48 15,777.30 0.00 20,384.10 25,400.00 89.66 151.31 7,664.35 7,593.90 -14,785.20 15,825.31 0.00 20,484.09 25,500.00 89.66 151.31 7,664.93 7,594.48 -14,872.92 15,873.32 0.00 20,584.08 25,600.00 89.66 151.31 7,665.52 7,595.07 -14,960.64 15,921.32 0.00 20,684.07 25,700.00 89.66 151.31 7,666.10 7,595.65 -15,048.36 15,969.33 0.00 20,784.06 25,800.00 89.66 151.31 7,666.69 7,596.24 -15,136.09 16,017.33 0.00 20,884.05 25,900.00 89.66 151.31 7,667.28 7,596.83 -15,223.81 16,065.34 0.00 20,984.04 26,000.00 89.66 151.31 7,667.86 7,597.41 -15,311.53 16,113.34 0.00 21,084.03 26,100.00 89.66 151.31 7,668.45 7,598.00 -15,399.25 16,161.35 0.00 21,184.03 26,200.00 89.66 151.31 7,669.03 7,598.58 -15,486.97 16,209.35 0.00 21,284.02 26,300.00 89.66 151.31 7,669.62 7,599.17 -15,574.70 16,257.36 0.00 21,384.01 26,400.00 89.66 151.31 7,670.20 7,599.75 -15,662.42 16,305.36 0.00 21,484.00 26,500.00 89.66 151.31 7,670.79 7,600.34 -15,750.14 16,353.37 0.00 21,583.99 26,600.00 89.66 151.31 7,671.38 7,600.93 -15,837.86 16,401.38 0.00 21,683.98 26,700.00 89.66 151.31 7,671.96 7,601.51 -15,925.58 16,449.38 0.00 21,783.97 26,800.00 89.66 151.31 7,672.55 7,602.10 -16,013.30 16,497.39 0.00 21,883.96 26,900.00 89.66 151.31 7,673.13 7,602.68 -16,101.03 16,545.39 0.00 21,983.95 27,000.00 89.66 151.31 7,673.72 7,603.27 -16,188.75 16,593.40 0.00 22,083.94 TD: 27000' MD, 7673.72' TVD 9/19/2016 11:22:01AM Page 7 COMPASS 5000.1 Build 74 SLB Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99A E) Kuparuk C Design: CD5-99Awpl9 C40 6,902.58 Targets Measured Target Name Vertical Dip Depth Depth hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Shape (°) (°) (usft) (usft) (usft) CD5-99 01.Heel 091616 JD 0.00 0.00 7,605.45 -6,673.44 11,216.47 plan misses target center by 16.41 usft at 16056.65usft MD (7600.30 TVD, -6663.50 N, 11228.47 E) Kuparuk C Circle (radius 100.00) 2,083.19 C40 6,902.58 CD5-99 02.Toe 041416 JD 0.00 0.00 7,658.45 -13,901.80 15,341.87 plan hits target center 13,163.88 6,644.35 Albian 95 Circle (radius 100.00) 4,046.88 K2 14,154.20 CD5-99 Polygon 091616 BP 0.00 0.00 7,673.72 -6,734.52 11,137.28 plan misses target center by 136.93usft at 16055.92usft MD (7600.25 TVD, -6662.94 N, 11227.98 E) 2,634.96 Polygon 15,277.91 7,504.81 Alpine B4 Point 1 7,673.72 0.00 0.00 Point 2 7,673.72 -745.92 576.53 Point 3 7,673.72 -9,502.24 5,368.39 Point 4 7,673.72 -9,406.23 5,543.85 Point 5 7,673.72 -647.51 750.66 Point 6 7,673.72 122.16 158.39 16,126.35 7,605.45 7-5/8" X 9-7/8" by 11" 7-5/8 11 27,000.00 7,673.72 4-1/2" x 6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) (usft) Name Lithology (°) (°) 13,514.90 6,830.36 Albian 94 13,828.83 6,996.72 HRZ (FCS) 3,771.61 2,856.52 C10 14,379.41 7,277.70 Kuparuk C 2,207.16 2,083.19 C40 6,902.58 4,016.81 K3 Basal Mbr 15,598.37 7,552.43 Alpine B3 13,163.88 6,644.35 Albian 95 6,983.77 4,046.88 K2 14,154.20 7,169.14 Kalubik (Base HRZ) 7,223.12 4,135.83 K2 Basal 3,165.40 2,634.96 C20 15,277.91 7,504.81 Alpine B4 13,671.50 6,913.35 Albian 93 14,396.05 7,284.83 LCU / Miluveach 6,305.21 3,794.30 K3 15,066.23 7,468.30 Alpine C 9,755.76 5,074.15 Albian 97 11,817.05 5,930.64 Albian 96 2,533.86 2,318.45 C30 13,954.66 7,063.40 HRZ 15,008.81 7,458.33 Alpine 15,101.59 7,474.44 UJU 9/19/2016 1122: 01AM Page 8 COMPASS 5000.1 Build 74 Database: EDM Production Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99A Design: CD5-99Awp19 Plan Annotations Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) 11,111.00 5,581.48 -4,299.65 7,507.16 11,141.00 5,592.96 -4,312.84 7,531.54 11,440.82 5,731.27 -4,440.57 7,764.48 14,155.82 7,170.00 -5,547.60 9,783.34 14,922.26 7,443.30 -5,930.84 10,381.68 15,210.20 7,493.30 -6,097.52 10,611.09 16,126.35 7,605.45 -6,716.33 11,273.63 16,146.35 7,606.85 -6,731.61 11,286.45 16,251.21 7,610.81 -6,811.87 11,353.80 16,451.21 7,611.96 -6,965.07 11,482.35 17,016.72 7,615.25 -7,431.23 11,800.87 24,392.96 7,658.45 -13,901.80 15,341.87 27,000.00 7,673.72 -16,188.75 16,593.40 Comment SLB Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature KOP: 4°/100' DLS, 150° TF, for 30' Start 3°/100' DLS, 180° TF, for 299.82' Hold for 2715' Start 3°/100' DLS, 18.58° TF, for 766.44' Hold for 287.94' Start 1.65°/100' DLS, 67.62° TF, for 916.15' Hold for 20' Start 3.5°/100' DLS, 0° TF, for 104.86' Hold for 200' Start 2°/100' DLS, 90.06° TF, for 565.51' Hold for 7376.24' Adjust TF to 0°, for 2607.04' TD: 27000' MD, 7673.72' TVD 9/19/2016 11:22'01AM Page 9 COMPASS 5000.1 Build 74 ConocoPhill ips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 Plan: CD5-99A 50-103-20748-00-00 CD5-99Awp19 Clearance Summary Anticollision Report 19 September, 2016 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: CD5-99A - CD5-99Awp19 Well Coordinates: Datum Height: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Scan Range: 11,111.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: • • Scan Type: 25.00 Failed Anti•Collisi Minor Risked Plan for child well, CD5-99AL1, excluded because it has yet to be updated. Conoco Phillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CD5-99 - CD5-99Awp19 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: C135 -99A - CD5-99Awp19 Scan Range: 11,111.00 to 27,000.00 usft. Measured Depth. Scan Radius is 2,896.34 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD4 Nanuq Pad CD4 -26 - CD4 -26 - CD4 -26 23,839.48 1,315.50 23,839.48 995.69 16,425.00 4.113 Clearance Factor Pass - Major Risk CD4 -318 - CD4 -318A- CD4 -318A 25,392.97 2,589.20 25,392.97 2,268.54 15,400.00 8.075 Clearance Factor Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,751.82 760.30 21,751.82 564.77 17,250.00 3.888 Centre Distance Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,718.92 773.70 21,718.92 550.47 17,400.00 3.466 Clearance Factor Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 Minor Risked I i 16,187.22 206.05 16,187.22 191.13 19,400.00 13.812 Clearance Factor Pass - Minor 1/20 CD4 -322 - CD4 -322 - CD4 -322 16,177.06 205.57 16,177.06 191.72 19,425.00 14.843 Centre Distance Pass - Minor 1/20 CD5 Alpine West Pad CD5-05 - CD5-05 - CD5-05 14,019.04 1,523.65 14,019.04 1,214.72 17,875.00 4.932 Clearance Factor Pass - Major Risk CD5-08 - CD5-08 - CD5-08 13,600.99 864.23 13,600.99 703.76 20,150.00 5.386 Clearance Factor Pass - Major Risk CD5-11 - CD5-11 - CD5-11 12,516.49 1,854.76 12,516.49 1,626.86 16,425.00 8.138 Centre Distance Pass - Major Risk CD5-11 - CD5-11 - CD5-11 12,603.26 1,859.65 12,603.26 1,621.34 16,550.00 7.804 Clearance Factor Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp05.1 (6D 13,680.34 604.86 13,680.34 320.64 13,950.00 2.128 Centre Distance Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp05.1 (6D 13,956.72 623.39 13,956.72 300.03 14,250.00 1.928 Clearance Factor Pass - Major Risk Plan: CD5-17 (6D) - Plan: CD5-171-1 - CD5-17L1wp05 13,680.34 604.86 13,680.34 320.64 13,950.00 2.128 Centre Distance Plan: CD5-17 (6D) - Plan: CD5-171-1 - CD5-17L1wp05 13,956.72 623.39 13,956.72 300.03 14,250.OD 1.928 Clearance Factor Rig: CD5-99 - Rig: CD5-99 - Rig: CD5-99 Minor Risked Pass - Major Risk Pass - Major Risk 7 19 September, 2016 - 11:22 Page 2 of 5 COMPASS Anticollision Report for Rig: CD5-99 - CD5-99Awp19 SurveV foo/ program From To (usft) (usft) 100.00 500.00 572.96 2,270.51 2,360.53 11,111.00 11,111.00 12,611.00 CD5-99Awp19 11,111.00 16,126.35 CD5-99Awp19 16,126.35 17,626.35 CD5-99Awp19 16,126.35 27,000.00 CD5-99Awp19 Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. Survey/Plan Survey Tool GYD-GC-SS M WD+I FR-AK-CAZ-SC M WD+I FR-AK-CAZ-SC MWD M WD+I FR-AK-CAZ-SC MWD M WD+I FR-AK-CAZ-SC ConocoPhillips(Alaska) Inc. -WNS Western North Slope 19 September, 2016 - 11:22 Page 3 of 5 COMPASS Nm Ladder View 11 24, September 19 CD5-99Awp19 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. Minor Risked 300- 00 0 0 CL a) ''.. W 150— 50 C) U 0 Equivelant Magnetic Distance 15000 17500 20000 22500 25000 Displayed interval could be less than entire well:Measured Depth11111.00 To 27000.00 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 100.00 500.00 CD5-99 Srvy 1 - SLB_GYD-GC-SS (Rig: CQEM&)GC-SS 7605.45 16126.35 7-5/8" X 9-7/8" by 11" 572.96 2270.51 CD5-99 Srvy 2 - SLB_MWD_GMAG (Rig: CID)NS9)IFR-AK-CAZ-SC 7673.72 27000.00 4-1/2" x 6-3/4" 2360.53 11111 .00 CD5-99 Srvy 3 - SLB_MWD+GMAG (Rig: OfD)N99)IFR-AK-CAZ-SC 11111.00 12611.00 CD5-99Awp19 (Plan: CD5-99A) MWD 11111.00 16126.35 CD5-99Awp19 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 16126.35 17626.35 CD5-99Awp19 (Plan: CD5-99A) MWD 16126.35 27000.00 CD5-99Awp19 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC m a Minor Risked 0 60— 0 .LD a W m 30— 0 U C) O N N U i 0 Equivelant Magnetic Distance 11500 12000 12500 13000 13500 14000 14500 Partial Measured Depth Nm k D5-99Awp19 .00 To 27000.00 6, September 19 2016 CASING DETAILS MD Name 16126.733/8" X 9-7/8" 6y 11"27000.00 4-1 /2" x 6-3/4" SURVEY P0.0GRAH Pt. From Dept. To rveylPl an Tool 108.88 CD5-99 Srvy 1 - SLB-GYO-GC-S5 (R91j1-m�s9j 572.96 2276.51 CD5-99 Srvy 2 - SLB_MW_GMAG (RigJOm»9q-GZ-SL 2]fi9.53 11111.06 -99 Srvy 3 - SLBJMU�GMAG (RiI�JDEff]l9Yj-CAZ-SC 1111.68 12611.0 CD5-99Ap19 (Plans COS-99Aj 11111.66 16126.]5 CD5-99Aw 9 (Plan: CD5-99Aj M4A1rIFR-AK-LAZ-SC 16126.35 1]fi 26.35 CD5-99Avp19 (Plan: CD5-99A) 126.35 2]666.66 COS-99Avpl9 (Plan: CD5-99A) MMU+IFR -AK-CAZ- MD Inc Azi TVD Dleg TFace Tai et 11111.00 68.03 118.09 5581.48 0.00 0.00 11141.00 66.99 118.74 5592.96 4.00 150.00 11440.82 58.00 118.74 5731.27 3.00 180.00 14155.82 58.00 118.74 7170.00 0.00 0.00 14922.26 80.00 126.00 7443.30 3.00 18.58 15210.20 80.00 126.00 7493.30 0.00 0.00 16126.35 86.00 140.00 7605.45 1.65 67.62 16146.35 86.00 140.00 7606.85 0.00 0.00 16251.21 89.67 140.00 7610.81 3.50 0.00 16451.21 89.67 140.00 7611.96 0.00 0.00 17016.72 89.66 151.31 7615.25 2.00 90.06 24392.96 89.66 151.31 7658.45 0.00 0.00 CD5-99 02.Toe 041416 JD 27000.00 89.66 151.31 7673.72 0.00 0.00 11111 11300 CD4 -322 Minor Risked' 11480 0/360 ,' 11660 225 11850 -30/330 210 30 12220 195 5' 13010 180 13630 13630 165 14240 14850 150 15460 15460 135 16070 -60/300 120 17300 17300 10 �, 19730 90 20940 20940 75 22150 23360 6 24570 24570 4 7 27000 3 1' -90/27 11 3 4 60 75 90 105 120 -120/240 135 150 165 180 195 -150/210 210 150 225- 11111 11300 11300 11480 11480 11660 11660 11850 11850 12030 12030 12220 12220 12400 12400 13010 13010 13630 13630 14240 14240 14850 14850 15460 15460 16070 16070 - 16690 16690 -- 17300 17300 18510 18510 19730 19730 20940 20940 22150 22150 23360 23360 24570 24570 25790 25790 27000 60 Rig: CD5-99 Minor Risked 7 120 11:35, September 19 201 c i2 y O O Lo N_ M t O z CD5-06L CD5-06 Easting (2500 usft/in) AC wells ONLY 4 CD5-01 CD5-05 5-08 CD4 -26 CD5-11 Rig: CD5- CD5-313PB1 CD5-313 M CD5-17L1wp05.1 (66) CD5-17wp05.1 (6D) Easting (2500 usft/in) CD4 -318A CD5-99Awp 9 z O _S 7 N U) 0 0 c N wellor-0-0 0=0 9k M D Casing Details _ 11111.00 Survey Program CD5Aw ND MD Name 760545 6126.35 7 5/8" X 9-7/8" by n" Depth From 100.00 Depth To 500.00 Survey/Plan Tool CD5 99 Srvy 1 - SLB GVD GC -SS (Rig: CD5 99) GVD-GC-SS 9 g p 1 g 7673.72 27000.00 4-1/2"x6-3/4" 572.96 2270.51 CD5-99 Srvy z-SLB_MWD GMAG(Rig: CD5 -gMWD+IFR-AK-CAZ-SC 14922.26 126.00 2360.53 til ti.00 CD5 99 Srvy 3-SLB_MWD+GMAG(Rig: CD59MWD+IFR-AKCAZ-SC 14240 16126.35 t1t11.DO t2616no CD5-ggAwpt9(Plan: CDS-99A) MWD 11111 TO 16070 1116 00161235 140.00 CD5-99Awp1q (Plan: CD5 99A) MWD +IFR AK CAZ-SC • 0 0 12000.00 16126.35 17626.35 CD5-99Awp1q (Plan: CD5-99A) MWD 20940 24392.96 16126.35 27000.00 CD5-ggAwpl9 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC M D Azi _ 11111.00 118.09 1166o 11141.00 118.74 11850 1144o.82 118.74 12220 14155.82 118.74 12400 14922.26 126.00 13630 15210.20 126.00 14240 16126.35 140.00 -6o/ 16146.35 140.00 16070 16251.21 140.00 ---- 17300 16451.21 140.00 18510 17o16.72 151.31 20940 24392.96 151.31 22150 27000.00 151.31 -90 / 270 -120/ 0/360 -18o/18o 11:27, September 19 2016 11111 11300 11300 11480 1148o 1166o 11660 11850 11850 12030 12030 12220 12220 12400 12400 13010 13010 13630 13630 14240 14240 14850 14850 _ 1546o 1546o 16070 16070 16690 16690 ---- 17300 17300 18510 18510 19730 19730 _ 20940 20940 22150 22150 2336o 2336o 24570 24570 25790 25790 27000 MD Casing Details Minoritieked 11111.00 Survey Program C D TVD MD Name 7605.45 16126.35 7-5/8" X 9 718" by 11" Depth From o0 00 Depth To 500.0- Survey/Plan Tool CD5-99 Srvy 1 - SLB_GYD-GC-SS (Rig: CD5-99) GYD GC-SS 5 g gAw p g 7673.72 27000.00 4-1)2"x6-3/4" 572.96 227-.51 CD5-99 Srvy z-SLB_MWD GMAC(Rig: CD5-90j)WD+IFR-AK-CAZ-SC 14922.26 126.00 236o.53 11111.00 CD5-99Srvy3-SLB MWD+GMAC(Rig:CD5-9OWD+IFR-AK-CAZ-SC 1000 0o T027000-00 16126.35 11111.00 11116.-o 12611.00 6116.35 CDS-99Awpt9(Plan: CD-99A5 MWD CD5-99Awp19(Plan: CD599A) MWD+IFR-AK-CAZ-SC • 16126.35 17626.35 CDS-99Awpt9 (Plan: CD5-99A) MWD 16451.21 140.00 t61z6.35 27000.00 CD5-99Awp19(Plan: CD 99A) MWD+IFR-AK-CAZ-SC MD AZi Minoritieked 11111.00 118.09 1166o 11141.00 118.74 11850 11440.82 118.74 12220 14155.82 118.74 12400 14922.26 126.00 13630 15210.20 126.00 14240 16126.35 140.00 -6o/300 16146.35 140.00 16070 16251.21 140.00 17300 16451.21 140.00 18510 17016.72 151.31 20940 24392.96 151.31 22150 23360 27000.00 151.31 -90 / 270 25790 25790 -120/ 0/360 11:28, September 19 2o16 •• 11111 11300 11300 11480 11480 1166o 11660 11850 11850 12030 12030 12220 12220 1240C 12400 13010 13010 13630 13630 14240 14240 14850 14850 15460 1546o 16070 16070 16690 16690 17300 17300 18510 18510 19730 19730 20940 20940 22150 22150 23360 2336o 24570 24570 25790 25790 27000 ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 50-103-20748-00-00 Plan: C135 -99A Plan: CD5-99Awp19 Error Ellipse Survey Report 19 September, 2016 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99A Design: CD5-99Awp19 SLB Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Survey Tool Program Date 9/19/2016 From To (usft) (usft) Survey (Wellbore) 100.00 500.00 CD5-99 Srvy 1 - SLB _GYD-GC-SS (Rig: C 572.96 2,270.51 CD5-99 Srvy 2 - SLB_MWD_GMAG (Rig: 2,360.53 11,111.00 CD5-99 Srvy 3 - SLB_MWD+GMAG (Rig: 11,111.00 12,611.00 CD5-99Awp19 (Plan: CD5-99A) 11,111.00 16,126.35 CD5-99Awp19 (Plan: CD5-99A) 16,126.35 17,626.35 CD5-99Awp19 (Plan: CD5-99A) 16,126.35 27,000.00 CD5-99Awp19 (Plan: CD5-99A) Position uncertainty and bias at survey station Tool Name GYD-GC-SS M WD+I F R-AK-CAZ-SC M WD+I FR-AK-CAZ-SC MWD M WD+I FR-AK-CAZ-SC MWD M WD+I F R-AK-CAZ-SC Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature 1.00 sigma EDM Production Description Gyrodata gyro single shots MWD+IFR AK CAZ SCC MWD+IFR AK CAZ SCC MWD - Standard MWD+IFR AK CAZ SCC MWD - Standard MWD+IFR AK CAZ SCC Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Semi -minor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (') (usft) (usft) (usft) (usft) (usft) (usft) (tisk) (usft) (usft) (usft) (°) 11,111.00 68.03 118.09 5,581.48 15.11 -0.52 49.40 0.11 13.92 3.47 8.00 49.42 6.73 119.74 MWD-IFR-AK-CAZ-SC (1, 3) 11,141.00 66.99 118.74 5,592.96 15.11 -0.37 49.59 0.10 13.93 3.48 8.04 49.59 6.80 119.74 MWD (1, 4) 11,440.82 58.00 118.74 5,731.27 14.99 0.92 51.55 1.44 13.97 3.68 8.60 51.56 6.83 119.70 MWD (1, 4) 11,817.05 58.00 118.74 5,930.64 15.16 0.92 54.96 3.30 14.11 4.07 9.78 54.96 6.96 119.63 MWD (1, 4) 13,163.88 58.00 118.74 6,644.35 15.35 0.92 54.11 0.03 14.26 5.26 11.45 54.12 7.17 119.69 MWD+IFR-AK-CAZ-SC(2,4) 13,514.90 58.00 118.74 6,830.36 15.51 0.92 55.25 0.03 14.40 5.66 12.19 55.26 7.30 119.69 MWD+IFR-AK-CAZ-SC (2,4) 13,671.50 58.00 118.74 6,913.35 15.55 0.92 55.55 0.03 14.43 5.76 12.37 55.56 7.33 119.69 MWD+IFR-AK-CAZ-SC (2,4) 13,826.83 58.00 118.74 6,996.72 15.65 0.92 56.16 0.03 14.51 5.96 12.75 56.16 7.40 119.68 MWD+IFR-AK-CAZ-SC (2.4) 13,954.66 58.00 118.74 7,063.40 15.70 0.92 56.47 0.03 14.55 6.06 12.95 56.47 7.44 119.68 MWD+IFR-AK-CAZ-SC (2,4) 14,154.20 58.00 118.74 7,169.14 15.78 0.92 56.96 0.03 14.61 6.22 13.25 56.96 7.50 119.68 MWD+IFR-AK-CAZ-SC (2,4) 14,155.82 58.00 118.74 7,170.00 15.78 0.92 56.96 0.03 14.61 6.22 13.25 56.96 7.50 119.68 MWD+IFR-AK-CAZ-SC (2,4) 14,379.41 64.38 121.10 7,277.70 15.96 -0.72 57.73 -0.50 14.72 6.44 13.71 57.76 7.60 119.70 MWD+IFR-AK-CAZ-SC (2,4) 14,396.05 64.86 121.27 7,284.83 15.96 -0.72 57.73 -0.50 14.72 6.44 13.71 57.76 7.60 119.70 MWD+IFR-AK-CAZ-SC (2,4) 14,922.26 80.00 126.00 7,443.30 15.80 -4.37 59.20 -1.52 15.01 6.69 14.51 59.54 7.77 119.84 MWD+IFR-AK-CA7-SC (2,4) 15,008.81 80.00 126.00 7,458.33 15.92 -4.37 59.83 -1.52 15.13 6.73 14.74 60.17 7.81 119.91 MWD+IFR-AK-CAZ-SC (2,4) 15,066.23 80.00 126.00 7,468.30 15.92 -4.37 59.83 -1.52 15.13 6.73 14.74 60.17 7.81 119.91 MWD+1FR-AK-CAZ-SC (2,4) 15,101.59 80.00 126.00 7,474.44 15.98 -4.37 60.20 -1.52 15.19 6.75 14.86 60.53 7.83 119.95 MWD+IFR-AK-CAZ-SC (2,4) 15,210.20 80.00 126.00 7,493.30 15.99 -4.37 60.23 -1.52 15.20 6.76 14.88 60.56 7.84 119.95 MWD+IFR-AK-CAZ-SC (2,4) 15,277.91 80.43 127.05 7,504.81 16.01 -4.52 60.37 -1.84 15.26 6.78 14.99 60.87 7.86 119.99 MWD+IFR-AK-CAZ-SC (2,4) 15,598.37 82.49 131.98 7,552.43 16.08 -5.02 60.54 -2.91 15.48 6.84 15.36 61.84 7.93 120.16 MWD+IFR-AK-CAZ-SC (2,4) 16,126.35 86.00 140.00 7,605.45 16.19 -5.94 59.96 -4.80 15.89 6.90 15.94 63.49 8.10 120.62 MWD (2,5) 16,146.35 86.00 140.00 7,606.85 16.19 -5.94 60.07 -4.75 15.87 6.90 15.95 63.62 8.15 120.58 MWD (2, 5) 16,251.21 89.67 140.00 7,610.81 15.90 -6.83 60.91 -4.24 15.88 6.91 15.90 64.42 8.19 120.85 MWD (2, 5) 16,451.21 89.67 140.00 7,611.96 15.94 -6.83 62.63 -3.27 15.92 6.91 15.85 66.03 8.33 121.38 MWD (2,5) 17,016.72 89.66 151.31 7,615.25 16.21 -6.83 62.79 -3.45 16.20 6.91 15.83 70.89 9.33 123.39 MWD (2,5) 24,392.96 89.66 151.31 7,658.45 21.71 -6.83 85.33 -7.49 21.70 6.96 23.26 90.05 17.71 132.29 MWD+IFR-AK-CAZ-SC (3, 5) 27,000.00 89.66 151.31 7,673.72 25.13 -6.83 97.87 -7.49 25.12 6.97 25.73 101.58 20.24 135.45 MWD+1FR-AK-CAZ-SC (3, 5) 9/19/2016 11:29:41AM Page 2 COMPASS 5000.1 Build 74 CD5-99wp19 Surface Location FZ CPAI Coo{olinate Con".erter From: Datum: jNAD83 Region:alaska t" Latitude&ongikude Decimal Degrees f" UTM Zone: r South I i State Plane Zone: 4 Units: us -ft w j y Legal Description (NAD27 only) To: Datum: NAD27 I Region: (alaska A Latitude/Longitude Decimal Degrees — UTM Zone: True F South ;+ State Plane Zone: 4 Units: us -ft C' Legal Description (NAD27 only) Starting Coordinates: - ; Ending Coordinates: — — X 1489591.67 X: 349558.527980958 i ( Y: 5965666.90 V ! Y: 5965920.93081628 � E ..........................................................1 Transform I Quit Help 'CD5-99wp19 Surface Location ii ff rn. C PA3 Coordinate Cc. nverter , From: Datum: 1NAD83 Region: jalaska i Latitude/Longitude Decimal Degrees UTM Zone: (- South Skate Plane Zone: 14 Units: us --ft T >* Legal C+esf-TO'bri tNAD27onlyJ Starting Coordinakes. — - ---� j X: fl489591.67.. Y: 5965666.90 To: - Datum: INAD27 I Region:alaska r Latitude/Longitude Decimal Degrees t UTM Zone: True F South C State Plane Zone: 4 w Units: u -ft t+ Legal Description (NAD27 only) Legal Description Township: 011 I+"::,] Range: 004 E Meridian: U Section: fj-8 FN L --I 287.0316$ FEL - 2420.8262 Transfos Quit Help CD5-99wp19 Surface Casing CP.J Coordinate Converter From: __ _ _ _ --- To: - I Datum: NAD83 Region: jalaska Datum: NAD27 Region: alaska C` LakitudelLongikude Decimal Degrees—� € '; C_ Latitude/Longitude Decimal Degrees UTM Zone: �— �"" South E � C UTM Zone: True F- South f+ State Plane Zane: 4 Units: us fi � , i Ce State Plane Zone: 4 Units: us ft I i Legal Description [NAD27 only] i i C Legal Description (NAD27 only) Starting Coordinates:------- ------ - Ending Coordinates: — - 1490002.71 _ j X: 349969.554317293 Y: 5965196.62 � f Y: 5965450.63497947 {{� ............. ................................ ............., Transform Quit Help CD5-99wp19 Surface Casing C. CPAI Coordinate Converter From: -- _ _ To: ---- - --- - Datum: INAD83 Region: alaska Datum: NAD27 Region: alaska r Latitude/Longitude Decimal Degrees " Latitude/Longitude IDecimaiDegrees Y� ' UTM Zone: — r- South C UTM Zone: ITrue South State Plane Zone: 4 T Units: us fk State Plane Zone: 14 ' Units: lu,.ft t" Leual DesE_.riPGon NAD27 � �rdy) Legal Description (NAD27 only) i F Starting Coordinates:— Legal Description X: 11490002.71 Township: 011 N , Range: 004 E Y5965196.62 Meridian: Section: yg- FNL 1749.03855 FEL 12002.2042 i ................, Transform Quik Help CD5-99wpl 9 Kick-off Point From: Domm Region:| Latitude/Longitude Decimal Degrees r` UTN Zone:[---- [- South /n S,uteP1one Zone: Units: � (- Legal Description (NAD27only) Starting Coordinates: Ending Coordinates: X: 1497010.40 .CD5-99wp19 Kick-off Point From:' Datum: Region: |NAD83 ,1 Reo�» /---- r Latitude/Longitude Pecimal Degree C- State Plane Zone: F --:D- Units: Fu7- -ft -':-: I Starting Coordinates: X: 11497010.40 Y: 5961217.64 To: [ T Datum: Region: r' Latitude/Longitude [DecimalDegrees (` UTN Zone: F -rue r- South u/ State Plane Zone: |4 .J Units: (- Legal Description (NAD27only) X: 356977i R�50023 Y: 5961471.40634576 To Datum Region: Latitude/Longitude Pecimal Degrees r State Plane Zone Units: nr Legal Description (NAD27only) Legal Deochphon-------�' ICD5-99wp19 Top of Production I [ E41 CPA. -Coordinate Con'-werter 0- 1, sg I From: ------- D atum: i fNAD83---- Region: jalaska r- Latitude/Longitude IDecimal Degrees UTM Zone: r South State Plane Zone: Units: us ft (- Legal Description (NAD27 only) - To: --- - - - --- Datum: f—NAD27 Region: Latitude/Longitude fDecimal Degrees UTM Zone: [T—rue I- South State Plane Zone:ns: 14 Units:us-ft (- Legal Description (NAD27 only) F- Starting Coordinates: -- X: - Ending Coordinates: I 11500727.28 Y: 15958725.98 CD5-99wp19 To F -I CPA: Coo-iJinate Converter of Production From: Datum: INAD83 I Region: alaska Latitude/Longitude 1Decimal Degrees C- UTM Zone: South State Plane Zone: Units: Starting Coordinates: - X: 11500727.28 Y: 15958725.98 X: 1360693.989698859 Y: F5-95-6979.6069759 .......... . . . ........ I ransGM"'' Quit Help ................ To: Datum: INAD27 I Region: fa-ja-s-k-a--,-j Latitude/Longitude IDecimal Degrees r UTM Zone: FT—rue South 'I (- State Plane Zone: 14 Units: ius-ft 6' Legal Description (NAD27 only) Legal Description Township: 011 N + Range: f554— rE--,-1 Meridian: Section: 21 FNLIFE 1 i32.8221 rI E 1733-4918 Transform Quit Help CD5-99wp19 Intermediate Casing I iFj, CP.I Coordinate C.omwerter O From: _-- -I-To. i Datum: NAD83 Region: alaska Dakum: NAD27 Region: alaska t Latitude/Longitude Decimal Degrees +� i i #' Latitude/Longitude Decimal Degrees 4 r UTM Zone: (" South ( C' UTM Zone: True F South Co' State Plane Zone: - Units: us-ft i i r Stake Plane Zone: 14 Units: Fu--ft J { Legal Description (NAD27 only) Legal Description (NAD27 only) Starting Coordinates: - — Ending Coordinates: - ----i j X 1500727.28 i : 360693.999698859 Y: 5958725.98 Y: 5958979.6069759 ...................................... Transform Quit Help CDS-99wp19 Intermediate Casing I CPA-I Coordinate Converter From: - -- - To: - - Datum: INAD83 �a Region: alaska � Datum: NAD27 t Region: alaska Latitude/Longitude Decimal Degrees Latitude/Longitude Decimal Degrees r UTM Zone: F South t"' UTM Zone: True r South Stake Plana Zone:14 Units: us-ft - Stake Plane Zone: 4 Units: us fk T 1 Legal Description (NAD27 only) A - Starting Coordinates: - - — -Legal Description 1500727.28 Township:Range: 017 N ► � 9 : 004 E f Y 5958725.98 Meridian: U Section:21 i FN L 1732.8221 FEL � 1733.4918 Transform Quit Help CD5-99wp19 TD EZ. CPAj, Coordinate Conuer-te From: — To:... - Datum: INAD83 Region:alaska + Datum: NAD27 _+ Region: alaska r LatitudelLon itude 9 Decimal Degrees Latitude/Longitude Decimal Degrees + C UTM Zone: f— F South UTM Zone: True F South C- State Plane Zone: 4 + Units: us-ft + i State Plane Zone: F----] Units: us-ft + i I C Legal Description (NAD27 only) i i Legal Description (NAD27 only) - — — L – ------ ---Starting StartingCoordinates: — -� X: r Ending Coordinates: - X: 11505855.31 365821.553777212 Y. 5949149.31 Y: 5949402.62379503 J .............................. ......................... . Transform € Quit Help CD5-99wp19 TD fZ CPAii Coordinate Lonverter ' From: - - - To: — - - Datum: N _D + Region: lalaska Datum: INAD27 I Region: jalaska + ` Latitude/Longitude Decimal Degrees + (' Latitude/Longitude Decimal Degrees t' UTM Zone: 1— F South r UTM Zone: True I- South 4' State Plane Zone:4 Units: us ft Stake Plane Zone: 4 + Units: us-ft + on!-,A i 4- Legal Description (NAD27 only) Starting Coordinates: -- -- Legal Description ----- - - - X: 1505855.31 i Township: 011 [N--,-] Range: 004 FE—,-] Y: 15949149.31 Meridian: 1" . ] Section: 34 FN L + 655.77026 IFEL 1173TO662 .... Transform Quit Help 19:36, September 16 2016 C D 5 -9 9Aw p 19 WELLBORE TARGET DETAILS Name ND CD5-99 02.Toe 041416 JD 7658.45 CD5-99 01 Heel 091616 JD 7605.45 (MAP CO-ORDINATES) Shape Circle (Radius: 100.00) Circle (Radius: 100.00) Gt u a rte r Mile View CD5-99 Polygon 091616 JD Circle 7605.45 CD5Polygon 091616 BP 7673.72 Circle (Radius 132 Polygon Cir Toe Circle 7673.72 Circle (Radius: 1320.00) 0 R -3000 GOA Off' 06 G Oyo$ -6000 N GO�Tro G�y�6 Goy 1 � 0 G �9 O O CD4-318A -9000 L G05' O 212000 0 -15000 Cp5.313 9 P�p1 9 -18000- 3000 6000 9000 12000 15000 18000 21000 24000 27000 19:38, September 16 2016 C D5-99Awp19 Quarter Mile View WELLBORE TARGET DETAILS Name TVD CD5-99 02.Toe 041416 JD 7658.45 CDS-99 01.Heel 091616 JD 7605.45 CD5 99 01,Heel 091616 JD Circle 7605.45 C05-99 Polygon 091616 BP 7673.72 (MAP CO-ORDINATES) Sha e P Circle (Radius: 100.00) Circle (Radius: 100.00) Circle (Radius 1320.00) Polygon Toe Circle 7673.72 Circle (Radius: 1320.00) -3000 C,QOS ° a tib 05 N Coa 6000 C: +� 9 O O CO-9000- 0 212000 G L O -15000- 5000-180003000 -18000- 3000 6000 9000 12000 15000 18000 21000 24000 27000 CD5-99Awpl 9 Kupark C 7200 LdU / Miluveach Section View � 22 7800; C�4-321 10000 12000 14000 16000 18000 Vertical Section at 152.000 4-1/2" x 6-3/4" 20000 22000 Alpine Alpine C 7350 UJU CL o Alpine B4 Alpine B3 °' 7500 d' - 0 O r O O 00 O O O In 0O NCOp 00 O O O N C,) O U 7650 7-5/8" X 9-7/8" by 11 " O O N N 'n C) o' `�CN i c�4 � 22 7800; C�4-321 10000 12000 14000 16000 18000 Vertical Section at 152.000 4-1/2" x 6-3/4" 20000 22000 Tollerable Collision Risk Worksheet ConocoPhillips Alaska Tolerable Collision Risk Worksheet based on Rev. 1 - 29 Jul 99 Use this sheet to describe a well interference scenario where QRA may be applicable. Check first that the scenario rea,4,4s different from those described on existing works ets. David Lee Johnson Njoku V Do the consequences o"0 of collision include a risk to personnel or the environment? Ales ConocoPhillips Alaska, Inc Drilling Anti -Collision Management Collision of CD5-99'Jth CD5-99 PBI Well CD5-99 fads anti-colhsion with our.plug back CD5-99PB1. There is no immediate danger to life or impact to the environment if well C135-99 Intersects CD5-99PBt as this side track has been abandoned and there is no pressure assasiacled with it. There is a cost impact if we hit the PB1 wellbore as depending on where we intersect we may be re exposing the shales we have already drilled and have been open for an extended period of lime. Qg Are the consequences of collision No HSt risks exist with GUb-99 intersecting (Xb-991`81. I ne only economic risk If we hit the exsisting wellbore is that we have issues as maybe we reopen the shales that have prevously been exposed. If this is the case, we would most likely have to plug back and side track again. V= $0 M = 20 F=1/M= 0.05 Is there a practical way aes to substantially reduce either the probability of collision or the severity of the consequences? Qao V= $66,000,000 1 F = 0,01 VF/C= 0.22 If VF 1 then close approach tolerances need not be set C If V F C < t then Tolerable Collision Risk =1 in C / V F Tolerable Collision Risk = 1 in 5 Minor Risk 1/10 applied. ConocoPhillips Alaska Tolerable Collision Risk Worksheet based on Rev. 1 - 29 Jul 99 Use this sheet to describe a well interference scenario where QRA may be applicable. Check Mrst that the scenarioreally Is I rent from those described on existing worksheets David Lee Johnson Njoku ConocoPhillips Alaska, Inc Drilling Anti -Collision Management Collision of CDS-99 with the lateral CD4 -322 Welt CD5-99 fads anti collision with the -well CD4 -322 based on WP19. There is no immediate danger to life or impact on the environment if well CD5-99 intersects CD4 -322 as C04-322 will he shut in while drilling CD5-99. If CDS-99 intersects CD4 -322 there would be damage and a cost ` impact as CD4 -322 may have to be redrilled and CD5-99 may have to be plugged back and the I intermediate section redrided. No risk of a well control issue exists because well CD4 -322 will be shut in and CD5-99 will have a high enough mud weight with ECD and MPD on connections to control the pressure in the reservoir, t i Do the consequences Are the of collision include a 2 risk to personnel or the consequences environment? of collision Ori No HSE risks exist with C135-99 Intersecting CD4322 while drilling as CD4 -327 will be shut in while we are drilling. Also, GD5-99 will have a high enough mud weight with ECD and MPD on connections to control the reservoir pressure. There is an economic concem with collision as if CD5-99 intersects CD4 - 322, in a worse case scenario CD4 -322 would have to be reddlled and CD5-99 would have to be plugged back and redrilled. As we are drilling CD5-99 we will be paying Gose attention to the magnetics as we drill by CD4 -322, if magnetic interference is picked up we will steer away from CD4 -322. Also, if we are more than 50' left of the planned line we will start surveying more frequently. Minor Risk 1/20 applied. As -built REVI DATE IBYI CKIAPPI DESCRIPTION REV 1 DATE I BY APP I DESCRIPTION 1 4/24/15 1 CZ I DB I C.A. I UPDATED PER K150003ACS 1 2 15/2/161 CZ I GD I C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT LOCATION OF THIS SURVEY T12 CD -PAD PAD T11 N CD4 TO ALPINE CD5 D .+* ACCESS ROAD CDul N =s z a cn ..F 'Q (] A �9 Z A LL IT CD1 IP VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 PPO CD -5 OF PAD NOO�pER ��aooa�GLn N OES\G op" Ln' xo��° ��oa�Qa q So Qoa�� `�'`� %x N � ��t.005 x�`�- - �c�NocOcn • QO �, cP \ X iNN ��N • � � . _ \ \ X �. � . X NNNfrP • — 'FAC,+�O� • WN • 4! • PLANT N N a NOTE: 1540 52" a CONDUCTOR CD5—x14 WAS PLUGGED AND LCMF ABANDONED APRIL 2016. KUUKPIK `� Z UMIAQ ALPINE SURVEY OFFICE PHONE : 907-670-4739 ALPINE MODULE: CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE—CD50-1025 1 1 OF 3 2 REVI DATE IBYI CKIAPPI DESCRIPTION I REV I DATE I BY u.. APP DESCRIPTION 1 4/24/15 1 CZ 1 DB I C.A. I UPDATED PER K150003ACS 1 2 5/2/16 CZ GD I C. A. I UPDATED PER K160003ACS ALL CONDUCTORS WELL Y' ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, SEC.LINE 0/S X' LAT.(N) LONG.(W) FNL FWL R 4 E, U. M. EXIST. GND PAD CD5-x99 1 5,965,666.90 1,489,591.67 70' 18 49.211 151 13 20.820 287 2508 27.5 33.9 CD5-x01 5,965,661.64 _ 1489572.44 70' 18 49.155 151' 13 21.378 293 2489 27.6 34.1 CD5-x02 5,965 656.28 1,489,553.29 70' 18 49.099 151' 13 21.934 299 2470 28.1 34.1 CD5-x03 5,965,650.92 1 489534.00 70' 18 49.042 151' 13 22.493 305 2451 28.4 34.1 CD5-x04 5,965,645.24 1 489 514.77 70' 18 48.982 151' 13 23.051 311 2432 26.6 34.2 CD5-x05 5,965,639.80 1489 495.46 70' 18 48.925 15113 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151 13 24.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1 489,437.69 70' 18 48.757 151 13 25.287 334 2355 28.1 34.3 CD5-x09 5,965,618.27 1 489 418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 5,965,613.12 1 489 399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 34.1 CD5-x11 5,965,607.66 1 489 379.86 70' 18 48.586 151' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,965,602.23 1 489 360.56 70' 18 48.529 151 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965 596.59 1,489 341.43 70' 18 48.470 151' 13 28.079 363 2259 26.1 34.2 G !1 C�_uG 1.489.322.3'78• 18' 8 8AlA 48.414" 151• 13 �l0 C22 ZCp n../1.A 11... 27-.-& -3.4-_ CD5 14X 5,965,589.94 1489317.35 70' 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1489303.11 70' 18 48.359 151' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965 580.48 1,489,283.58 70' 18 48.300 151' 13 29.757 380 2202 27.6 34.0 CD5-x17 5,965,575.11 1 489 264.31 70' 18 48.243 151' 13 30.316 386 2183 27.7 34.0 CD5-x18 5,965,569.79 1 489 245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1 489 225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965,558.96 1 489 206.70 70' 18 48.073 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,965 553.51 1,489,187.22 70' 18 48.016 151' 13 32.552 409 2106 27.8 33.8 CD5-x22 5,965,548.14 1489168.15 70' 18 47.959 151' 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965,542.72 1 489 148.81 70' 18 47.902 151 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1 489129.64 70' 18 47.846 151' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1,489110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5,965,526.59 1 489 091.09 70' 18 47.732 151' 13 35.340 438 2010 26.3 33.7 CD5-x27 5,965,521.20 1,489,071.88 70' 18 47.675 151 13 35.897 444 1991 27.5 33.7 CD5-x28 5,965,515.81 1 489 052.48 70' 18 47.618 151 13 36.460 449 1972 27.4 33.6 CD5-x29 5,965,510.40 1,489,033.34 70' 18 47.561 151' 13 37.015 455 1953 27.6 33.6 CD5-x30 5,965,504.97 1,489,014.02 70' 18 47.504 151' 13 37.575 461 1934 25.3 33.6 CD5-x31 5 965 499.57 1,489,994.73 70' 18 47.447 151' 13 38.135 467 1915 26.6 33.6 CD5-x32 5965,494.13 1,488 975.45 70' 18 47.390 151' 13 38.694 473 1895 26.8 33.6 CD5-x33 5,965,488.75 1488956.35 70' 18 47.333 151' 13 39.248 478 1876 27.0 33.6 8a,,-- NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B. P. M. S. L.) 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. KUUKPIK U M I aa Q ALPINE SURVEY OFFICE PHONE : 907-670-4739 ConocoPhillips Alaska, Inc. ALPINE MODULE: CD50 ALPINE PROJECT CD-5 WELL CONDUCTORS AS-BUILT LOCATIONS UNIT: CD CADD FILE N0. 15-03-02-1 04/18/2015 DRAWING N0: 1 CE-CD50-1025 PART: 1 1 of 3 REV: 2 TRANSMITTAL LETTER CHECKLIST WELL NAME:/�- PTD: � i � / 2� /Development Service Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: �j�J o i POOL: l'� lUt�J g(WO i Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- - - - function (If last two digits Production should continue to be reported as a of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 Well Name: COLVILLE RIV UNIT CD5-99A Program DEV Well bore seg ❑ PTD#:2161220 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type DEV / PEND_GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j.1_.A)&.2.A-D) NA 1 Permit_ fee attached NA 2 Lease number appropriate Yes Surface location on Fee-ASRC_property; well passes through ADL 387208; top prod interval on 3 Unique well name and number Yes Fee-ASRC property; portion of productive interval passes through ADL 387209; TD on Fee-ASRC property. 4 Well located in a defined pool Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 4436. 5 Well located proper distance from drilling unit boundary Yes CO No. 443B contains no -spacing restrictions with respect to drilling unit boundaries. 6 Well located proper distance from other wells Yes CO No. 443B has no interwell spacing restrictions. 7 Sufficient acreage available in drilling unit Yes CO No, 443B has no interwell spacing restrictions. Wellbore will be more than 500' 8 If deviated, is wellbore plat included Yes from an external property line where ownership or landownership changes. 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes Appr Date 11 Permit can be issued without conservation order Yes 12 Permit can be issued without administrative approval Yes SFD 9/19/2016 13 Can permit be approved before 15 -day wait Yes I14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 18 Conductor string provided NA Conductor provided in CRU_CD5-99 Engineering 19 Surface casing protects all known USDWs NA Surface casing provided in CRU CD5-99 20 CMT vol adequate to circulate on conductor & surf csg NA_ Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons No Productive interval will be completed with uncemented liner w/ frac sleeves 23 Casing designs adequate for C, T, B & permafrost_ Yes 24 Adequate -tankage _or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a_re-drill, has_a 10-403 for abandonment been approved Yes PTD 216 -093, -Sundry 316-480 126 Adequate wellbore separation proposed Yes Anti -collision analysis complete; CD4 -322 fails major risk and is SI _@ surf !27 If diverter required, does it meet regulations NA Appr Date 128 Drilling fluid program schematic _& equip list adequate Yes Max formation_ pressure is 3754 psig(9.5 ppg EMW); will drill w/ 9.0-11.2 ppg EMW VTL 9/20/2016 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 2986 psig; will test BOPs to 3500 psig 31 Choke manifold complies w/API RP -53 (May 84) Yes - 32 Work will occur without operation shutdown Yes 33 Is presence of 1-12S gas probable Yes H2S measures required _ 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No H2S measures required. Geology 36 Data presented on potential overpressure zones Yes Expected reservoir pressure is about 9.3 ppg EMW; will be drilled with 9.5 ppg mud. Rig Appr Date 37 Seismic analysis of shallow gas zones NA will be prepared to weight up if needed. SFD 9/19/2016 38 Seabed condition survey (if off -shore) NA 39 Contact name/phone for weekly progress reports [exploratory only] NA Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date