Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-124DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161240 Well Name/No. COLVILLE RIV UNIT CD5-99AL1 Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-61-00 MD 16821 TVD 7490 Completion Date 11/30/2016 Completion Status 1-0IL Current Status 1-0I1- UIC No REQUIRED INFORMATION Mud Log No Samples No v Directional Survey Yes ✓/ DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 27797 Digital Data 42 2347 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- . 99AL1 Scope Gamma Ray_RM_LAS_LW D001.1as ED C 27797 Digital Data 2296 15582 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99AL1_Scope Resistivity_RM_LAS _LWD007.las ED C 27797 Digital Data 15114 16822 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99AL1_Scope Resistivity_RM_LAS _LWD011.las ED C 27797 Digital Data 42 16822 12/8/2016 Electronic Data Set, Filename: CPAI_CD5- 99AL1_Scope Resistivity_RM_LAS9.las ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99AL1_Scope_Gamma_Ray_RM_LW D001.dlis ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99AL1_Scope_Gamma_Ray_RM_LWD001.html ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99AL1_Scope_Resistivity_RM_LWD007.diis ' ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99AL1_Scope_Resistivity_RM_LWD007.html ED C 27797 Digital Data 12/8/2016 Electronic File: CD5- 99AL1 _Scope_Resistivity_RM_LW D011.dlis . ED C 27797 Digital Data 12/8/2016 Electronic File: CD5- 99AL 1 _Scope_Resistivity_RM_L W D011. htm I . ED C 27797 Digital Data 12/8/2016 Electronic File: CPA[ _CD5- 99AL1_Scope_Resistivity_RM.dlis z ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99AL1 _Scope_Resistivity_RM.html . ED C 27797 Digital Data D 12/8/2016 Electronic File: CPAI_CD5- 99AL1_Scope_Resistivity_2MD_RM.pdf AOGCC Page 1 of 3 Tuesday, April 25, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161240 Well Name/No. COLVILLE RIV UNIT CD5-99AL1 Operator CONOCOPHILLIPS ALASKA INC API No. 50-103-20748-61-00 MD 16821 TVD 7490 Completion Date 11/30/2016 Completion Status 1-0I1- Current Status 1-0I1- UIC No ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- P 99AL1_Scope_Resistivity_2TVD_RM.pdf ' ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- Q 99AL1_Scope_Resistivity_5MD_RM.pdf ED C 27797 Digital Data 12/8/2016 Electronic File: CPAI_CD5- 99AL1_Scope_Resistivity_5TVD_RM.pdf ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad27 EOW CompassSurveys.pdf ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad27 [canvas].txt ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad27 [macro].txt . ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad27 [petrel].txt - ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad27 [surveys].txt ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad83 EOW , Compass Surveys. pdf ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad83 [canvas].txt' ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad83 [macrol.txt' ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad83 [petrel].txt ED C 27797 Digital Data 12/8/2016 Electronic File: CD5-99AL1 Nad83 [surveys].txt• Log C 27797 Log Header Scans 0 0 2161240 COLVILLE RIV UNIT CD5-99AL1 LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Production Test Information Y / NA! Geologic Markers/Tops D COMPLIANCE HISTORY Directional / Inclination Data Mud Logs, Image Files, Digital Data (Y} VA Core Chips Y NA Mechanical Integrity Test Information Y�A Composite Logs, Image, Data Files �K ) Core Photographs Y NA Daily Operations Summary Cuttings Samples Yb Laboratory Analyses Y NA AOGCC Page 2 of 3 Tuesday, April 25, 2017 DATA SUBMITTAL COMPLIANCE REPORT 4/25/2017 Permit to Drill 2161240 Well Name/No. COLVILLE RIV UNIT CD5-99AL1 Operator CONOCOPHILLIPS ALASKA INC MD 16821 TVD 7490 Completion Date 11/30/2016 Completion Status 1-0I1- Current Status 1-011- Completion -OILCompletion Date: 11/30/2016 Release Date: 10/10/2016 Description Date Comments Comments: Compliance Reviewed By: Date: API No. 50-103-20748-61-00 UIC No AOGC'C Page 3 of 3 Tuesday, April 25, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED JAN 0 5 2017 r WELL COMPLETION OR RECOMPLETION REPORT AN 1 a. Well Status: Oil 0 t Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WI NJ ❑ WAG❑ WDSPL ❑ No. of Completions: 1 b. Well Class: Development[2] Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Aband.: 11/30/2016 14. Permit to Drill Number / Sundry: 216-124 / ' 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: LL ""�v 11 131 It, 15. API Number: 50-103-20748-61-00 4a. Location of Well (Governmental Section): Surface: 287' FNL, 2421' FEL, Sec 18, T11N R4E, UM Top of Productive Interval: N/A Total Depth: 2155' FNL, 11 72'FEL, Sec 21, T11 N, R04E, UM 8. Date TD Reached: 11/7/2016 16. Well Name and Number: 'CRU CD5-99AL1 9. Ref Elevations: KB:70.4 GL: 33.9 BF: 17. Field / Pool(s): Col ville River Unit/Alpine Pool ' 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ADL ASRC-NPR2, ASRC-NPR4, ADL 387208, ADL 387 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 349559 y- 5965921 Zone -4 TPI: x- N/A y- N/A Zone -4 Total Depth: x- 361249 y- 5958547 Zone -4 11. Total Depth MD/TVD: 16821/7490 ' 19. Land Use Permit: 932128, 932669, 932193, 932195 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: 1340/1325 5. Directional or Inclination Survey: Yes [2] (attached) No ❑ 13. Water Depth, if Offshore: 21, Re-drill/Lateral Top Window MD/TVD: Lt, Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) I N/A I5 13Ll /:q 5T)c t 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD HOLE SIZE CEMENTING RECORD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM PULLED 20 78.6 H-40 36 115 36 115 42 10 yds 103/4 45.5 L-80 36 2337 36 2183 131/2 354 bbls 11.0 ppg, 56.3 bbls 15.8 ppg 75/8 29.7 L-80 34 15571 36 7564 9 7/8 x 11 168 bbls 15.8 Class G Open Hole 15121 16821 17498 7489 63/4 24. Open to production or injection? Yes ❑ No FZ] If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): 1-2 (0 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3 1/2 15252 15226 MD/7516 TVD 14512 MD/7357 TVD 14586 MD/7382 TVD 15197 MD/7571 TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No Q Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: N/A Method of Operation (Flowing, gas lift, etc.): NO TEST Date of Test: Hours Tested: Production for Test Period -1111o. Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: I Flow Tubing Press. Casinq Press: Calculated 24 -Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity -API (corr): AO W1 Form 10-407 ReviVd 11/2015a / CONTI UED ON PAGE 2 Submit ORIGINIAL on}��, 28. CORE DATA Conventional Core(s): Yes ❑ No [21 Sidewall Cores: Yes ❑ No 0 If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No P] If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1340 1325 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval N/A N/A information, including reports, per 20 AAC 25.071. UJU 16335 7489 TD 16821 7489 Formation at total depth: Alpin C / 31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, naleontoloaical reoort, oroduction or well test results er 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: David Lee (a) 263-3741 Email: David. L. Lee co .com Printed Name: G.L. Alvord Title: Alaska Drilkling Manager - /� Si nature: r - Ge.`- • Phone: 265-6120 Date: - %4 1. S oU INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only WNS PROD ConocoPhillip5 I Well Attrlbut Max Alaska, Inc. Wellbore APUUWI FieldName Wellbore Status ncl (°) .. 501032074800 ALPINE PROD I K CD5-99 I ast WOE 1 1 36.551 11/30/2016 Broca maoc. Annotation Depth (ftKB) Last Tag: End Date Annotation Last Mod By End Date Rev Reason: NEW WELL pproven 11/30/2016 ............................................................................................ MANGER; 31.1 ....._....................................................... .. ......_....... ......................................................... .. ....._.. CONDUCTOR, 36.6-115.0 SURFACES 36.0-2 337.1 r.........._ .................._ INTERMEDIATE; 34.1-15,570.6 Cement Plug; 2,139.0 ftKB Cement Plug, 2,677.0 ftKB Cenant Plug; 6,607.0 We Cement Plug; 10,800.0 ftKB Cement Plug; 14,800.0 ftKB CementSqueezes Top (TVD) Bt. (TVD) Top (ftKB) Btm (ftKB) (ftKB) (ftKB) Des Start Date Com 14,800.0 15,410.0 6,953.9 7,176.1 Cement Plug 9/192016 10,800.0 11,403.0 5,465.2 5,690.3 Cement Plug 9/202016 6,607.0 7,327.0 3,906.5 4,174.5 Cement Plug 9/272016 2,677.0 2,739.0 2,405.2 2,440.2 Cement Plug 9/28/2016 2,139.0 2,677.0 2,029.5 2,405.2 Cement Plug 9/30/2016 Notes: General & Safety End Date Annotation NOTE: WNS PROD CD5-99A Cano o "illips Alaska, Inc, CD5.99A, 1!42017 2:02:17 PM erbca ........................................................................................... HANGER; 31.1 ............................................................. .......... ......................................................... .. .......... CONDUCTOR; 36.6-115.0 NIPPLE; 2,134.7 SURFACE; 36.0-2,337.1-� Mehl Skin Patch 7-5/8"; 2,270.9- 2,4580 GAS LIFT; 4,909.2 GAS LIFT; 10,247.8 XO Threads; 10,265.2 GAS LIFT; 14,378.8 GAUGE; 14,437 .1 LOCATOR; 14,458.9 SEAL ASSY; 14,459.9 PER; 14,465.9 PACKER; 14,511.6 - NIPPLE; 14,538.3 SEAL ASSY; 14,55fi 2 Tubing - Pup; 14,558 0 MULE SHOE; 14,562.8 PACKER; 14,585.7 NIPPLE; 14,601.7 PACKER; 15,196.7 NIPPLE; 15,216.1 LOCATOR; 15,222.1 MULE SHOE; 15,251 0 i INTERMEDIATE; 34.1-15,570.6 I E PRODUCTION LINER; 15,226.1 -27,071.0 Notes: General Safety End Date IAnnotation NOTE. WNS PROD Conocolhillips�`" Well Attribut AlaSka.Inc, WellboreAPUUWI FieldNar --- 501032074861 ALPINE CD5-99AL1 11/30/2016 _-- erbca. ....mabc. aclu Annotation Depth (ftKB) End Date Annotation Last Mad By Entl Date ............................................................................................. HANGER; 31.1 asmg rings ................ ................G.ER;.......................... .... ................ Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (ND)... WUGrade Len (I...7,500.5 Top Thread Window Ll 67/8 15,121.0 15,134.0 ......................................................... .. .......... Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... wvLen I Grade Top Thread Open Hole 63/4 6.750 15,121.0 16,821.0 Casing Description OD (in)ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (ND)... WtlLen Q... Gratle Top Thread ECP Packer Assembly 41/2 3.950 15,500.1 15,797.0 7,518.8 12.60 L-80 IBTM CONDUCTOR; 36.6-115.0 NIPPLE; 2,134.7 SURFACE; 36.32,337.1 Metal Skin Perch 7-50. 2.270,9- ,270.32,458.0 2.453.0 GAS LIFT; 4,909.2 GAS LIFT; 10,247.8 %O Threads; 10,265.2 GAS LIFT; 14,378.8 GAUGE; 14,437.1 LOCATOR; 14,458.9 SEAL ASSY; 14,459.9 PER; 14,465.9 PACKER; 14,511.6 NIPPLE; 14,538.3 SEAL ASSY; 14,556.2 Tubing -Pup; 14,558.0 MULE SHOE; 14,562.6 PACKER; 14,585.7 NIPPLE; 14,601.7 INTERMEDIATE; 34.1-15,570.6 Wind—Ll; 15,121.315,134.0 I ECP Packer Assembly; 15,500.1 -15,797.0 • Open Hale; 15,121.316,821.0 > Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 8/27/2016 8/27/2016 3.00 MIRU MOVE RURD P Prep floor for skid, blow down lines. 0.0 0.0 00:00 03:00 Disconnect electric and service lines. 8/27/2016 8/27/2016 4.50 MIRU MOVE MOB P Move pits and motors 15" away from 0.0 0.0 03:00 07:30 sub. Skid rig floor into the moving position. Stage rig to move mats around. Turn tires to crab rig and set transition mats. 8/27/2016 8/27/2016 2.50 MIRU MOVE MOB P Crab rig down pad, turn tires. Spot sub 0.0 0.0 07:30 10:00 over well CD5-99. 8/27/2016 8/27/2016 2.00 MIRU MOVE MOB P Lower stomper and preload with 500 0.0 0.0 10:00 12:00 psi. Lower wind wall. Walk pits/ motors down to sub. Skid rig floor into drilling position. Finish spotting pits / motors to sub. 8/27/2016 8/27/2016 2.00 MIRU MOVE RURD P Hook up service lines (Air, Steam, 0.0 0.0 12:00 14:00 Water, Mud lines, Fuel) Work on rig acceptance checklist. Pipe shed spotted, electrician hook up power cables to sub, top drive power cables. Rig accept @ 14:00 hrs. 8/27/2016 8/27/2016 3.00 MIRU MOVE RURD P R/U riser, flow line, riser clamp, turn 0.0 0.0 14:00 17:00 buckles, hole fill and bleed off hose on riser. Electrician test gas alarms. 4" ball valves on conductor. Swap to Hiline power @ 14:45 hrs. GIS on Hiline @ 16:00 hrs. 8/27/2016 8/27/2016 0.50 MIRU MOVE SFTY P Pre -Spud meeting with drilling crew, 0.0 0.0 17:00 17:30 CPA[, Tool Pusher, DD/MWD, Mud Eng. 8/27/2016 8/27/2016 3.00 MIRU MOVE RURD P Function annular (OK). P/U BHA tools 0.0 0.0 17:30 20:30 to rig floor from beaver slide. Flush water through muline. Pressure test mudline to 5000 psi for 10 minutes. No leaks. 8/27/2016 8/27/2016 2.50 MIRU MOVE BHAH P PJSM, P/U BHA to 95' as per SLB 0.0 115.0 20:30 23:00 DD/MWD. Continue to M/U BHA and stand back in derick w! 1 stand DC due to issues in pit room. 8/27/2016 8/28/2016 1.00 MIRU MOVE RGRP T Encountered problems in shaker 115.0 115.0 23:00 00:00 installation. Test ran spud mud over shakers @ -300 gpm and disvovered mud won't preferentially travel down the trough. Mud underflow flows over the weirs under the shaker (Tray) both front and back, then into drag chain via under shakers. Superinendant, Tour pusher and welders begin alterations via adding jet lines and widening the trough where possible. SIMOPS- R/U Gyro sheave in derrick. P/U 5" HWDP and rack back in derrick. Page 1/73 Report Printed: 12/1/2016 Rig: UUYUN IV Time Log Start Time End Time Dur (hr) Phase 8/28/2016 8/28/2016 TOO MIRU 00:00 08:00 E 08:00 109:15 8/28/2016 09:15 8/28/2016 09:30 0.25MIRU 8/28/2016 09:30 8/28/2016 12:00 2.50 SURFP Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) d' haker trou h to1 115.01 115.0 SRP T Continue to moify s g accomodate flow rates needed for surface. Increased flow area leaving shakers to the trough and added gun lines to help jet mud. Tested shakers after modifications with 800gpm flow rate. SIMOPS- PIU 5" HWDP and 5" DP for surface hole. Load shed with 5" DP, number and strap same. Load shed with 10-3/4" casing, HAH T UBH0 was observed leaking out the set screw hole while testing new shaker system. Break off and lay down leaking UBHO, carry scribe line up from MWD, install new UBHO, orientate lug key way on UBHO with MWD scribe line. Run in locking screws, confirm Gyro will orientate. Make up stand and pump down to confirm no leaks. VASH P Wash conductor down to 115' MD, 475 gpm 550 psi. )DRL P Drill from 115' MD to 371' MD. ART=2.15 hrs, AST=O hrs. ADT=2.15 hrs. P/U=75k, S/O=75k, ROT=75k. 450 gpm, 640 psi, 50 rpm, 1 k TQ. Experimenting with different scalper screen sizes, jetting configuratons to optimize shaker performance. B/2812016 8/29/2016 12.00 SURFAC DRILL DDRL P Uirectionai ann Trom 3T i rviv LU r,JQ� 12:00 00:00 MD, 1,554' TVD. ADT=6.49, AST=3.29, ART=3.20. P/U=115k, S/0=1 10k, R0T=114k, TQ on/off=4.1/1.7k. 450-580 gpm, 1800 psi. Change shaker screens on all three levels to handle flow. Poked holes in scalpers to minimize blinding after attempting API 10, 20 and 30 screens (once in clay). Screen lower decks down to API 120. Also working drag chain isses due sticky clay packing in trough. f sticky cla 8/29/2016 8/29/2016 2.00 SURFAC DRILL RGRP T bottom of drag chainDue to heavy buildptrough, had toin 00:00 02:00 change out to a harder paddle to scrape trough. After changing paddle, had to clean out the drag chain trough of clay by scraping / chipping so harder paddle would pass. In the proccess, the drag chain switch broke, electrician repaired while floorhands cleaned out the trough. fl E 371.01 1,582.0 Page 2173 Report Printed: 12/1/20161 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (MB) 8/29/2016 8/29/2016 9.50 SURFAC DRILL DDRL P Directional drill from 1,582' MD to 1,582.0 2,347.0 02:00 11:30 2,347' MD, 2,189' TVD. ADT=6.56, AST=2.51, ART=4.05. P/U=125k, Jar Hrs=13.05. S/0=120k, ROT=120k, TQ on/off=6k/4k. 580-800 gpm, 2600 psi. Weight up mud system to 9.6 ppg @ 1,900' MD, then 10.0 ppg by TD. 8/29/2016 8/29/2016 0.50 SURFAC CASING CIRC P Pump survey on bottom, pump 2,347.0 2,246.0 11:30 12:00 weighted sweep with Nut Plug M. CBU 358 bbl, lay down single and rack back 1 stand. 8/29/2016 8/29/2016 2.25 SURFAC CASING CIRC P CBU X 4, racking back stand after 2,246.0 1,772.0 12:00 14:15 each BU from 2,246' MD to 1,772' MD at full rates 800 gpm, 2360 psi, 60 rpm, 3k Tq. 8/29/2016 8/29/2016 0.25 SURFAC CASING OWFF P Flow check well for 15 minutes, static. 1,772.0 1,772.0 14:15 14:30 8/29/2016 8/29/2016 0.75 SURFAC CASING TRIP P POOH on elevators from 1,772' MD to 1,772.0 1,488.0 14:30 15:15 1,488' MD. Pulling over 25k @ 1,609', 1,602', 1,519', 1,488'. Decide to pump out. 8/29/2016 8/29/2016 0.75 SURFAC CASING PMPO P Pump out of hole from 1,488' MD to 1,488.0 1,300.0 15:15 16:00 1,300' MD @ 550 gpm, 1260 psi, no rotary. 8/29/2016 8/29/2016 2.00 SURFAC CASING TRIP P POOH on elevators from 1,300' MD to 1,300.0 84.0 16:00 18:00 84' MD. Observed tight spot @ 312' MD, 25k overpull. Worked it twice, third time pulled trough no more overpull. 8/29/2016 8/29/2016 2.00 SURFAC CASING BHAH P PJSM, lay down BHA per SLB 84.0 0.0 18:00 20:00 DD/MWD reps. Clean and clear rig floor. 8/29/2016 8/29/2016 1.50 SURFAC CASING RURD P P/U and R/U Volant CRT, bail 0.0 0.0 20:00 21:30 extensions, hand slips, bowl inserts, 101/V elevators and casing equipment, 350T slips, 101/V Hanger. 8/29/2016 8/29/2016 0.25 SURFAC CASING SFTY P PJSM on running 10%" casing with 0.0 0.0 21:30 21:45 DDI, CPAI, Doyon casing. 8/29/2016 8/30/2016 2.25 SURFAC CASING PUTB P Pick up shoe, shoe track, Float collar 0.0 481.0 21:45 00:00 and XO jt. Flow test through floats and check floats OK. Continue P/U 101/4" Hydril 45.5# 563 casing to 481' MD 8/30/2016 8/30/2016 3.75 SURFAC CASING PUTB P Continue running 101/4" 45.5# L-80 481.0 1,489.0 00:00 03:45 Hydril 563 casing from 481' MD to 1,489' MD (Jt 35). Took weight to block weight @ 880' MD, repeated attempts to pass past 900' very slow. Establish circulation @ 2 bpm, increased to 3 bpm and washed down joint #21. 8/30/2016 8/30/2016 0.75 SURFAC CASING CIRC P CBU (110 bbl) @ 1,489' MD, stage 1,489.0 1,489.0 03:45 04:30 pumps up from 3 bpm to 5 bpm. 8/30/2016 8/30/2016 2.75 SURFAC CASING PUTB P Continue running 101/4" 45.5# L-80 1,489.0 2,299.0 04:30 07:15 Hydril 563 casing from 1,489' to 2,299' 8/30/2016 8/30/2016 0.50 SURFAC CASING HOSO P M/U hanger & landing joint. Land 2,299.0 2,337.0 07:15 07:45 casing on hanger @ 2,337'. PU wt 142 k, SO wt 131 k Page 3/73 ReportPrinted: 121112016 Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase 8/30/2016 8/30/2016 2.00 SURFAC 07:45 09:45 09:45 112:15 12:15 12:30 8/30/2016 8/30/2016 12:30 13:00 8/30/2016 8/3012016 13:00 16:00 6:00 116:15 00 6/30/2016 8/30/2016 1.75 16:15 18:00 8/30/2016 8/30/2016 4.00 18:00 22:00 22:00 100:00 8/31/2016 8/31/2016 00:00 02:00 Start Depth (ftKB) End 2,337.0 Depth (ftKB) 2,337.0 8/31 /2016 8/31 /2016 02:00 06:00 T -3-1/20167—f8/3-1/201 6 06:00 :00 .00 SU Operations Summary (with Timelog Depths) C D5-99 Job: DRILLING ORIGINAL Code Activity Code Time P -T -X Operation Start Depth (ftKB) End 2,337.0 Depth (ftKB) 2,337.0 NT CIRC T Attempt to establish circulation. Pumping 1 - 3 bpm @ 480 psi on the up stroke & pumps off on the down stroke. No returns on the down stroke. Cont to reciprocate pipe & circ out thick heavy mud for a total of 200 bbls pumped before full returns were established. NT CIRC P Circ & cond mud for cement job. 2,337.0 2,337.0 Stage pumps f/3 to 8 bpm. ICP 480 psi & FCP 150 psi. PU wt 142 k, SO wt 131 k _NT RURD P B/D top drive & R/U cementing lines. 2,337.0 2,337.0 .NT CIRC P Break circ thru cemtnlines w/8 bpm @ 2,337.0 2,337.0 420 psi. PJSM on cementing. .NT CMNT P Dowell PT lines to 3500 psi, Dowell 2,337.0 2,337.0 pump 75 bbls 10.5 ppg Mud Push II w/5 bpm @ 165 psi, Drop btm plug, Dowell pump 288 bblS 11.0 ppg (846 sks - 1.91 yld LiteCrete) lead cement w/5 bpm @ 300 psi, Dowell pump 50 bbls 15.8 ppg (240 sks - 1.17 yld Class G) 15.8 ppg tail cement w/5 bpm @ 350 psi, Drop top plug, Dowell pump 20 bbls water, 5 bpm, 350 psi, Rig chase with 197 bbls 10.0 ppg DrilPlex mud w/8 bpm @ 800 psi, slow to 3 bpm @ 450 psi last 10 bbls, and bump on schedule with 1952 stks @ 96% eff. Pressure up to 950 psi & hold for 5 min. Check floats (good) CIP @ 15:52 hrs. Reciprocate pipe w/full returns. 165 bbls good cement to surface. ENT OWFF P OWFF static, Function 20" annular 3 x 0.0 0.( (Flush with 35 bbl treated water) Leave annular closed & monitor psi. ENT RURD P Rig down cementing equipment, clean 0.0 O.i and clear rig floor. Break off 10' pup from 2 piece landing joint. -ENT WOC P Mechanic inspect & service IBOP. 0.0 0. Install new sensor for MWD on stand pipe. Test stand pipe to 5000 psi. Test IBOP to 3500 psi. Check pre -charge on hydraulic accumulator on top drive. SIMOPS - W.O.C. & clean pits. tENT WOC P M/U BHA #2 as per SLB & rack back 0.0 0. in derrick. SIMOPS - W.O.C. & clean pits. SENT WOC P M/U BHA #2 as per SLB & rack back 0.0 0. in derrick. SIMOPS - W.O.C. & clean pits. TENT WOC P Pick up 27 stands 5" DP & rack back 0.0 0 in derrick. SIMOPS - W.O.C. & clean pits. RENT RURD P M/U 10 3/4" pup jt to landing joint. 0.0 0 Back out & L/D landing joint. 4/73 Report Printed: 1 0 g Operations Summary (with Timelog Depths) v CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 8/31/2016 8/31/2016 1.00 SURFAC CEMENT WWWH P Flush stack from rig floor with water 0.0 0.0 07:00 08:00 hose. Mud caked on. M/U stack washer, fill pill pit with H2O. Wash stack. B/D top drive & L/D stack washer. 8/31/2016 8/31/2016 2.50 SURFAC CEMENT NUND P N/D surface riser, flowline, drains, 0.0 0.0 08:00 10:30 holefill lines. N/D 20" surface annular and adapter. Remove from cellar. 8/31/2016 8/31/2016 1.00 SURFAC WHDBOP NUND P N/U FMC Alpine Gen II wellhead and 0.0 0.0 10:30 11:30 test to 1000 psi ten minutes witness CPAI. 8/31/2016 8/31/2016 3.50 SURFAC WHDBOP NUND P N/U BOPE to well head. Connect 0.0 0.0 11:30 15:00 kill/choke & koomy lines. 8/31/2016 8/31/2016 5.50 SURFAC WHDBOP MPDA P N/U MPD & 1502 equipment, Orbit 0.0 0.0 15:00 20:30 valve, Katch Kan, drain/return lines, flobox/line, clamp, cement line, set MPD test plug. Test MPD equipment to 250/1200 psi for 5 minutes each. Pull MPD test cap and install trip nipple. Send trip nipple to shop for modifications. 8/31/2016 8/31/2016 1.25 SURFAC WHDBOP RURD P Function blind rams. Set 5" test joint & 0.0 0.0 20:30 21:45 function pipe rams. R/U to test BOPE. Fill stack w/H20 8/31/2016 9/1/2016 2.25 SURFAC WHDBOP BOPE P Test BOPE w/5" test joint. Annular, 0.0 0.0 21:45 00:00 HCR choke/kill 250/2500 psi for 5 min. Upper 3 1/2" X 6" VBR's, choke valves 1,12,13,14, auto IBOP, 4" Demco, choke valves 9, 11, man IBOP, HCR kill, needle valve, dart valve & choke valves 5,8,10 to 250/3500 psi for 5 min. Test witness waived by Guy Cook of the AOGCC 9/1/2016 9/1/2016 4.00 SURFAC WHDBOP BOPE P Continue test BOPE w/5" test joint. 0.0 0.0 00:00 04:00 Test choke valves #2 - 7, HCR Choke and Kill, man choke/kill, 3 1/2" X 6" lower VBR's, & blind rams to 250/3500 psi for 5 min. Koomey test; IP= 3,000 psi, press after close = 1,525 psi, 200 psi recovery 32 sec, full recovery 137 sec, N2- 4 bottle average= 2250 psi. Tested gas alarms. Draw down on man & super choke to 1,100 psi. - Test waived by Guy Cook of the AOGCC. 9/1/2016 9/1/2016 1.00 SURFAC WHDBOP RURD P Circulate through Poor Boy Degasser 0.0 0.0 04:00 05:00 staging up from 1 by to 8 bpm 9/1/2016 9/1/2016 1.00 SURFAC WHDBOP RURD P Drain stack, pull test plug and install 0.0 0.0 05:00 06:00 wear ring (10-7/8" 0. D. x 10" 1. D. x 4.33' L) 9/1/2016 9/1/2016 1.25 SURFAC CEMENT BHAH P Make up BHA # 2 per directional driller 0.0 823.0 06:00 07:15 to 823' 9/1/2016 9/1/2016 1.00 SURFAC CEMENT TRIP P Trip in hole from 823' to 2,048' 823.0 2,048.0 07:15 08:15 9/1/2016 9/1/2016 1.00 SURFAC CEMENT CIRC P Circulate and condition mud prior to 2,048.0 2,048.0 08:15 09:15 casing test w/600 gpm @ 1400 psi. PIU wt 127 k, S/O wtl 13 k, ROT wt 120 k, 50 rpm 9/1/2016 9/1/2016 1.25 SURFAC CEMENT PRTS P Rig up and test casing to 3500 psi for 2,048.0 2,048.0 09:15 10:30 30 min. Record test on chart. Page 5173 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 �- Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Depth ffrKR) End Deoth MK8) 00:00 100:30 Start Time End Time Our (hr) Phase SURFAC OpCode CEMENT Activity Code RU -RD Time P -T -X P Operation Blow down test lines and R/D testing equipment 9/1/2016 10:30 9/1/2016 11:00 0.50 9/1/2016 11:00 9/1/2016 13:30 2.50 SURFAC CEMENT MPDA P Pull trip nipple & install MPD bearing. Test MPD system, Practice Ramp Up/ Ramp Down with pumps simulating constant BHP. B/D top drive & MPD choke. Pull MPD bearing & install trip nipple. 0.75 SURFAC CEMENT -TR-Ip-F5- efrrom 1,960 to 2,182'. Tag i top of cin ement. 9!1/2016 13:30 9/1/2016 14:15 SURFAC CEMENT COCF P W@&170 psi,,182'to 2,249'w/500 m 30 rpm @ 3 8 k trq Tag float collar on depth. 9/1/2016 14:15 9/1/2016 15:15 1.00 SURFAC CEMENT DRLG P 2D,347hw/630 gpmrat @ 1470 psi, 30t-50 rpm, 3.5 - 4.5 k trq. 9/1/2016 15:15 9/1!2016 18:45 3.50 0.25 SURFAC CEMENT DDRL P Drill 20'from 2,347'to MD /J2,204'tTVD, ADT 28 hrs. Displace to 9.6 ppg LSND on the fly 9/1/2016 18:45 9/1/2016 19:00 0.25 SURFAC CEMENT DISP P LSND. BROOH froml2 367' to 2,328' 9/112016 19:00 9/1/2016 19:15 1.00 SURFAC CEMENT FIT P R/U (955 pstesting eQR/D testingT to 18.0 equipment. ppg ( psi). 9 P 9/1/2016 19:15 9/1/2016 20:15 0.25 0.50 INTRMI INTRM1 DRILL DRILL REAM DDRL P P W&R from 2,328'to 2,367'w1600 gpm @ 1300 psi, 60 rpm, 3.5 k trq Drill ahead f/2,367' to 2,423' MD, ADT .49 hrs, ECD 10.05 ppg, 600 gpm, 1300 psi, PU wt 130 k, SO wt 9/1 9/1/2 016 /220:30 20:159!1/2016 9/1/2016 20:30 9/1/2016 21:00 118 k, ROT wt 124 k, 60 rpm, Trq 4.6/2.2 k ft lbs, 5/10 wob (Shakers not able to handle solids load, decision made to POOH to shoe) 0.25 INTRM1 DRILL BKRM T BROOH to shoe f/2,423 to 2,328' (No rotation across shoe) 9/1/2016 9/1/2 21:09/1/2016 9/1/2016 9/1/221:1 1.00 INTRMI DRILL RGRP T New shakers not able to handle cuttings load with scalper & shaker screen configuration. Trouble shoot 21:15 9/112016 22:15 shaker screens. Try various flow rates 0.75 INTRMI DRILL CIRC T Stage flow rates p flow rtes to 60o 795 gpm0Wash nage hole to 2,423'. Shakers appear to be 9/1/2016 22:15 9/1/2016 23:00 handling flow. Decision made to drill ahead. 1.00 INTRMI DRILL DDRL P 2,248hND, ADT .57 hrs, ECDD10.10 ppg, 795 gpm, 2190 psi, PU wt 130 k, 9/1/2016 23:00 9/2/2016 00:00 SO wt 118 k, ROT wt 124 k, 60 rpm, Trq 4.6/2.2 k ft lbs, 5/10 wob nnoi P frill f/2428 to 2464' 00:00 100:30 K A ,428.0 2,328. 0 Page 6173 Report Printed: 12/1/20161 1,960.0 2,182.0 2,182.0 2,249.0 2,249.0 2,347.0 2,347.0 2,367.0 2,367.0 2,328.0 2,328.0 2,328.0 2,328.0 2.367.0 2,367.0 2,423.0 K A ,428.0 2,328. 0 Page 6173 Report Printed: 12/1/20161 z Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/2/2016 9/2/2016 0.50 INTRMI DRILL CIRC P Activate under ream. Drop 1.25" 2,464.0 2,464.0 00:30 01:00 Torlon ball. Pum down to 250 gpm, @ 250 psi for 3 minutes and then 150 gpm @ 130 psi for 3 minutes, Seat ball and shear out with 1645 psi. Stage flow rate to 800 gpm and observe pressure decrease from 2200 psi to 1650. TRPM decreased from 3398 rpm to 2812 rpm indicating under reamer is open. Ream down 5'. Pull test on shoe to 10 kips. Slack off T and ream to bottom. Reamer open at 2354' 9/2/2016 9/2/2016 3.50 INTRMI DRILL DDRL P Drill from 2464' to 2804'@ 600 gpm, 2,464.0 2,804.0 01:00 04:30 1040 psi, 80 rpm, Rotary torque = 4k ft -lbs. Shakers having difficulty with clay 9/2/2016 9/2/2016 1.25 INTRM1 DRILL BKRM T Backream out of the hole from 2804' 2,804.0 2,450.0 04:30 05:45 to 2450' pumping @ 600 gpm @ 1000 psi 80 rpm 9/2/2016 9/2/2016 0.25 INTRM1 DRILL CIRC T Circulate bottoms up at 2518' keeping 2,450.0 2,450.0 05:45 06:00 underreamer below the shoe. Circulate at 594 gpm, 1030 psi, 80 rpm 9/2/2016 9/2/2016 0.25 INTRM1 DRILL TRIP T Pull into the show from 2450' to 2337' 2,450.0 2,337.0 06:00 06:15 9/2/2016 9/2/2016 1.25 INTRM1 DRILL RGRP T Moniitor well while modifying shale 2,337.0 2,337.0 06:15 07:30 1 1 shakers 9/2/2016 9/2/2016 1.00 INTRM1 DRILL TRIP T RIH from 2337' to 2706'. Fill pipe and 2,337.0 2,804.0 07:30 08:30 wash to 2804' 9/2/2016 9/2/2016 3.50 INTRM1 DRILL DDRL P Drill ahead f/2,804' to 3,273' MD / 2,804.0 3,273.0 08:30 12:00 2,673' TVD, ADT 4.57 hrs, ECD 10.79 ppg, 790 gpm, 1930 psi, PU wt 135 k, SO wt 115 k, ROT wt 125 k, 180 rpm, Trq 7/5 k ft lbs, 5110 wob 9/2/2016 9/3/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/3,273'to 5,190 MD / 3,273.0 5,190.0 12:00 00:00 3,376' TVD, ADT 8.4 hrs, ECD 11,49 ppg, 795 gpm, 2670 psi, PU wt 144 k, SO wt 115 k, ROT wt 124 k, 180 rpm, Trq 8.513.5 k ft lbs, 10/20 wob 9/3/2016 9/3/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/5,190' to 6,856' MD 1 5,190.0 6,856.0 00:00 12:00 3,995' TVD, ADT 8.57 hrs, ECD 11.52 ppg, 798 gpm, 3000 psi, PU wt 170 k, SO wt 127 k, ROT wt 135 k, 180 rpm, Trq 17112 k ft lbs, 20/25 wob. Pumping nut plug sweeps everyother stand 9/3/2016 9/4/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/6,856' to 8,831' MD / 6,856.0 8,831.0 12:00 00:00 4,730' TVD, ADT 7.72 hrs, ECD 11.35 ppg, 795 gpm, 2710 psi, PU wt 180 k, SO wt 135 k, ROT wt 150 k, 180 rpm, Trq 16/7.5 k ft lbs, 22/30 wob. Pumping nut plug sweeps everyother stand 9/4/2016 9/4/2016 2.00 INTRMI DRILL DDRL P Drill ahead f/8,831' to 9,205' 8,831.0 9,205.0 00:00 02:00 9/4/2016 9/4/2016 0.75 INTRMI DRILL RGRP T Circulate w/400 gpm @ 950 psi & 9,205.0 9,205.0 02:00 02:45 attempt to get shaker screens positioned properly on shaker deck. Rubber seal in back of shaker fell off & took some down time to put back into position. Page 7/73 Report Printed: 12/1/2016 Uperations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log - Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/4/2016 9/4/2016 9.25 INTRM1 DRILL DDRL P Drill ahead f/9,205" to 10,710' MD / 9,205.0 10,710.0 02:45 12:00 5,423' TVD, ADT 8.23 hrs, ECD 11.16 ppg, 795 gpm, 2690 psi, PU wt 210 k, SO wt 140 k, ROT wt 170 k, 180 rpm, Trq 19/10 k ft lbs, 25/30 wob. 9/4/2016 9/4/2016 6.50 INTRMI DRILL DDRL P Drill ahead f/10,710'to 11,745' MD / 10,710.0 11,745.0 12:00 18:30 TVD 5,809', ECD 11.2 ppg, 795 gpm, 2750 psi, PU wt 220 k, SO wt 138 k, ROT wt 172 k, 180 rpm, Trq 20111 k ft lbs, 25/30 wob. 9/4/2016 9/4/2016 1.00 INTRM1 DRILL RGRP T Circulate w/350 gpm @ 850 psi. 11,745.0 11,745.0 18:30 19:30 Adjust weir plate on shaker #2 to allow more flow across shaker deck. 9/4/2016 9/5/2016 4.50 INTRM1 DRILL DDRL P Drill ahead f/11,745'to 12,500' MD / 11,745.0 12,500.0 19:30 00:00 6,089' TVD, ADT 7.5 hrs, ECD 11.26 ppg, 795 gpm, 2780 psi, PU wt 235 k, SO wt 146 k, ROT wt 183 k, 180 rpm, Trq 19/10 k ft lbs, 30/35 wob. 9/5/2016 9/5/2016 0.75 INTRMI DRILL DDRL P Drill ahead f/12,500'to 12,594' 12,500.0 12,594.0 00:00 00:45 9/5/2016 9/5/2016 0.50 INTRMI DRILL RGRP T Circulate w/350 gpm @ 800 psi. 12,594.0 12,594.0 00:45 01:15 Shaker screens blinded off. C/O all shaker screens on shaker #2. Rubber seal in back of shaker fell off & took some down time to put back into position. 9/5/2016 9/5/2016 10.75 INTRM1 DRILL DDRL P Drill ahead f/12,594'to 14,210' MD / 12,594.0 14,210.0 01:15 12:00 6,723' TVD, ADT 7.41 hrs, ECD 11.07 ppg, 795 gpm, 3170 psi, PU wt 260 k, SO wt 150 k, ROT wt 190 k, 180 rpm, Trq 30/15 k ft lbs, 30/35 wob. 9/5/2016 9/5/2016 2.00 INTRM1 DRILL DDRL P Drill ahead f/14,210'to 14,468' MD! 14,210.0 14,468.0 12:00 14:00 6,820' TVD, ADT 1.04 hrs 9/5/2016 9/5/2016 2.50 INTRM1 DRILL CIRC P Circ 2 B/U w/795 gpm, 3250 psi, 170 14,468.0 14,374.0 14:00 16:30 rpm, 17-22 k trq. SIMOPS - PJSM on installing RCD bearing. Rack back 1 stand DO to 14,374' 9/5/2016 9/5/2016 0.75 INTRMI DRILL MPDA P F/C (static) Remove trip nipple & 14,374.0 14,374.0 16:30 17:15 install RCD bearing. 9/5/2016 9/5/2016 0.50 INTRM1 DRILL REAM P W&R f/14,374' to 14,468'w/795 gpm 14,374.0 14,468.0 17:15 17:45 @ 3010 psi. Break in RCD bearing with various rpm's 9/5/2016 9/6/2016 6.25 INTRM1 DRILL DDRL P Drill ahead f/14,468' to 14,950' MD ! 14,468.0 14,950.0 17:45 00:00 6,997' TVD, ADT 3.96 hrs, ECD 11.37 ppg, 795 gpm, 3500 psi, PU wt 275 k, SO wt 142 k, ROT wt 194 k, 180 rpm, Trq 28.5/19 k ft lbs, 20/25 wob. 9/6/2016 9/6/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/14,950' to 15,830' MD / 14,950.0 15,830.0 00:00 12:00 7,305' TVD, ADT 8.6 hrs, ECD 11.61 ppg, 795 gpm, 3500 psi, PU wt 295 k, SO wt 150 k, ROT wt 175 k, 180 rpm, Trq 28/19 k ft lbs, 15/20 wob. 9/6/2016 9/7/2016 12.00 INTRM1 DRILL DDRL P Drill ahead f/15,830'to 16,530' MD! 15,830.0 16,530.0 12:00 00:00 7,464' TVD, ADT 9.4 hrs, ECD 11.65 ppg, 795 gpm, 3920 psi, PU wt 315 k, SO wt 145 k, ROT wt 200 k, 180 rpm, Trq 32/22 k ft lbs, 20/30 wob. Page 8173 Report Printed: 121112016 = Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (f KB) End Depth (ftKB) 9/7/2016 9/7/2016 12.00 INTRMI DRILL DDRL P Drill ahead f/16,530' to 17,047' MD / 16,530.0 17,047.0 00:00 12:00 7,562' TVD, ADT 9.48 hrs, ECD 11.5 ppg, 795 gpm, 3700 psi, PU wt 325 k, SO wt 135 k, ROT wt 210 k, 180 rpm, Trq 34/27 k ft lbs, 34/27 wob. 9/7/2016 9/7/2016 2.75 INTRM1 DRILL DDRL P Drill ahead f/17,047' to 17,048' MD / 17,047.0 17,048.0 12:00 14:45 7,563' TVD, ADT 1.67 hrs. Not able to make new footage. Weight transfer to bit. Decision made to close under reamer and see if that would aid in drilling ahead. 9/7/2016 9/7/2016 1.25 INTRM1 DRILL CIRC P Drop 1.625" ball to close under reamer 17,048.0 17,048.0 14:45 16:00 Initial 795 gpm, 3810 psi, 2627 trpm Final 795 gpm, 4070 psi, 3125 trpm 9/7/2016 9/7/2016 0.50 INTRM1 DRILL DDRL T Drill ahead f/17,048'to 17,049' MD / 17,048.0 17,049.0 16:00 16:30 7,564' TVD, ADT .40 hrs. Decision made to call TD short due to nat able to make newfoofage.-ECD 1 1. 44 ppg, 795 gpm, 3950 psi, PU wt 325 k, SO wt 135 k, ROT wt 210 k, 180 rpm, Trq 34/27 k ft lbs, 34/27 wob. 9/7/2016 9/8/2016 7.50 INTRM1 CASING CIRC P Circulate hole clean for 4 B/U w/795 - 17,049.0 17,030.0 16:30 00:00 750 gpm, 4020 - 3860 psi, 180 rpm, 23/29 k trq. L/D single joint to 17,030' 9/8/2016 9/8/2016 5.00 INTRM1 CASING CIRC P Circulate hole clean for 4 B/U (8 total) 17,030.0 17,030.0 00:00 05:00 w/785 - 750 gpm, 4100 - 3900 psi, 180 rpm, 23/29 k trq. Maintain ECD's 11.6 ppg 9/8/2016 9/8/2016 2.00 INTRM1 CASING CIRC P Weight up from 10.3 ppg to 10.6 ppg 17,030.0 17,030.0 05:00 07:00 w/750 gpm @ 3980 psi 9/8/2016 9/8/2016 1.00 INTRM1 CASING OWFF P Perform MPD finger print on the 17,030.0 17,030.0 07:00 08:00 Kuparuk C. Rotate 10 rpm @ 25 k trq. 9/8/2016 9/8/2016 2.25 INTRM1 CASING CIRC P Weight up from 10.6 ppg to 10.8 ppg 17,030.0 17,030.0 08:00 10:15 w/700 gpm @ 3600 psi 9/8/2016 9/8/2016 0.25 INTRMI CASING OWFF P F/C (static) Rotate 10 rpm @ 25 k trq. 17,030.0 17,030.0 10:15 10:30 9/8/2016 9/8/2016 0.25 INTRMI CASING MPDA P Line up MPD equipment to strip OOH 17,030.0 17,030.0 10:30 10:45 9/8/2016 9/8/2016 1.00 INTRMI CASING SMPD T Attempt to Strip OOH as per back 17,030.0 16,998.0 10:45 11:45 schedule f/17,030' to 16,998'. Tight hole attempt to work thru with no success. 9/8/2016 9/8/2016 2.00 INTRMI CASING BKRM P BROOH f/16,998' to 16,811' w/650 16,998.0 16,811.0 11:45 13:45 gpm @ 3040 - 3280 psi, 100 rpm @ 27 - 35 k trq 9/8/2016 9/8/2016 1.75 INTRM1 CASING CIRC T Circ B/U w/650 gpm @ 3310 psi, 100 16,811.0 16,811.0 13:45 15:30 rpm @ 21 - 26 k trq 9/8/2016 9/8/2016 0.50 INTRM1 CASING OWFF T F/C (static) Rotate 10 rpm @ 25 k trq. 16,811.0 16,811.0 15:30 16:00 9/8/2016 9/8/2016 1.50 INTRM1 CASING SMPD T Attempt to Strip OOH as per back 16,811.0 16,529.0 16:00 17:30 schedule f/16,81 V to 16,529'. Tight hole attempt to work thru losing down weight. Decesion made to run back in hole. 9/8/2016 9/8/2016 0.75 INTRM1 CASING REAM T W&R f/16,529' to 16,811' w/600 gpm, 16,529.0 16,811.0 17:30 18:15 2990 - 3080 psi, 100 rpm, 20 - 25 k trq Page 9/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) � s = i ` r CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code CASING Activity Code CIRC Time P -T -X T Operation Circ B/U w/650 gpm @ 3310 psi, 100 (ftKB) 16,811.0 End Depth (ftKB) 16,811.0 9/8 /2016 9/818:15 9/8/2016 2.25 INTRMI rpm @ 21 - 26 k trq. Adjust 20:30 parameters to keep ECD below 11.8 ppg 9/8/2016 9/9/2016 3.50 INTRMI CASING BKRM P BROOH holding 11.5 ppg ECD on 16,811.0 16,177.0 20:30 00:00 connections with MPD ramp schedule f/16,81 V to 16,177', 580 - 600 gpm, 2850 - 3000 psi, 100 rpm, 22 - 33 k trq. (2 minor pack offs @ 16,355'& 16,205') 9/9/2016 9/9/2016 12.00 —INTRM1 CASING BKRM P BROOH f/16,177' to 15,024', 580 - 16,177.0 15,024.0 00:00 12:00 590 gpm, 2850 - 2900 psi, 100 - 120 rpm, 22 - 26 k trq. (Pack offs @ 16,092'& 15,879') Holding 11.5 ppg ECD on connections with MPD ramp schedule. 9/9/2016 9/10/2016 12.00 INTRM1 CASING BKRM P BROOH f/15,024' to 12,755', 685 - 15,024.0 12,755.0 12:00 00:00 725 gpm, 2880 - 3520 psi, 120 rpm, 16 - 27 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. ---1-2,7-55.0 9/10/2016 9/10/2016 2.75 INTRMI CASING BKRM P BROOH f/12,755'to 12,123' w1700 12,123.0 00:00 02:45 gpm, 3410 psi, 120 rpm, 16 - 20 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. 9/10/2016 9/10/2016 0.50 INTRMI CASING SVRG P Service rig. 12,123.0 12,123.0 02:45 03:15 SIMOPS C/O swab on mud pump #1. Circ w/mud pump #2 405 gpm @ 1380 psi, 120 rpm 17 k trq. 9/10/2016 9/10/2016 0.50 INTRMI CASING RGRP T C/O swab on mud pump #1. Circ 12,123.0 12,123.0 03:15 03:45 w/mud pump #2 405 gpm @ 1380 psi, 120 rpm 17 k trq. 9/10/2016 9/10/2016 9.00 INTRMI CASING BKRM T BROOH f/12,123' to 9,770' w/700 12,123.0 9,770.0 03:45 12:45 800 gpm, 3410 psi, 120 rpm, I3 15 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. Pumped high vis sweep 9/10/2016 9/10/2016 1.75 INTRMI CASING CIRC T Circ 2 B/U w/800 gpm, 3100 3410 12,123.0 9,770.0 12:45 14:30 psi, 120 rpm 13 14 k trq. 9/10/2016 9/10/2016 0.50 INTRM1 CASING OWFF T F/C (static) ROT 7 rpm, 10 k trq. Line 9,770.0 9,770.0 14:30 15:00 up MPD 9/10/2016 9/10/2016 0.50 INTRM1 CASING SMPD T 'to 9,730' Tight Strip OOH f/:with 9,770.0 9,730.0 15:00 15:30 hole, 55k ovll. Attempt to work thru 3 timesno success. Decisionto cont. BRO 9/10/2016 9/11/2016 8.50 INTRMI CASING BKRM T BROOH f/9,770' to 8,600' w/800 gpm, 9,770.0 8,600.0 15:30 00:00 3130 - 3490 psi, 120 rpm, 11 - 19 k trq. Maintaining ECD's <11.8 ppg & holding 11.5 ppg ECD on connections with MPD ramp schedule. Minor pack offs 9,185' & 9,058'. Pumped nut plug sweeps to aid in BHA balling Page 10/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 f • f Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/11/2016 9/11/2016 10.25 INTRM1 CASING BKRM T Continue BROOH from 8,800' MD to 8,600.0 7,232.0 00:00 10:15 7,232' MD @ 800 gpm, 3400-3250 psi, 120 rpm, 16.5-19k TQ, holding 11.5 ppg on connections with MPD. Experience tight spots and packoffs @ 8479', 8399', 7964', 7957', 7837', 7400'. Pipe displacement + losses of 7 -9 bbl per 5 stands. 9/11/2016 9/11/2016 0.75 INTRM1 CASING BKRM T Continue BROOH from 7,232' MD to 7,232.0 6,950.0 10:15 11:00 6,950' MD @ 800 gpm, 3030 psi, 120 rpm, 21.5k -9k TQ. Not holding back pressure on connections with MPD. Adjust pulling speed to maintain ECD below 12.0 ppg. 9/11/2016 9/11/2016 1.50 INTRM1 CASING CIRC T CBU @ 6,950' MD @ 800 gpm, 2990- 6,950.0 6,856.0 11:00 12:30 2900 psi, 120 rpm, 7.5k TQ. Take SPR's and rack back stand to 6.856' MD. 9/11/2016 9/11/2016 2.00 INTRMI CASING OWFF T Flow check well. Observe slight flow, 6,856.0 6,856.0 12:30 14:30 decreasing. Initial 2.3 bph, Final .9 bph. Shut in chokes and monitor pressure for buildup. Observed pressure hover @ 6-12 psi for 15 minutes (thermal expansion). Consult with engineers, agree to continue POOH. Line up to strip out with MPD 9/11/2016 9/11/2016 0.25 INTRM1 CASING SMPD T Attempt to strip out with MPD from 6,856.0 6,856.0 14:30 14:45 6,856' to 6,846' MD. Pulled 50k over 3X, unable to pull through, able to slack off free. P/1 -1=170k, S/0=125k, ROT=140k 9/11/2016 9/12/2016 9.25 INTRM1 CASING BKRM T Continue BROOH from 6,856' MD to 6,856.0 4,684.0 14:45 00:00 4,684' MD @ 795 gpm, 3350-2870 psi, 120 rpm, 6k-11 k TQ. Not holding back pressure on connections with MPD. Pumped 10 ppb Nut Plug sweep @ 6,573'. Pump 1 BU @ 4,971' MD while backreaming stand due high ECD (12.0 ppg+). Adjust pulling speed to maintain ECD below 12.0 ppg. Backreaming @ —300-500 fph, observing minor packoffs and over pull / torque at higher pulling speeds. Good pipe displacement, losing average 3 bbl per 5 stands after including losses from shakers to GIS. 9/12/2016 9/12/2016 1.00 INTRM1 CASING BKRM T Continue backreaming out of hole 4,684.0 4,499.0 00:00 01:00 from 4,684' MD to 4,499' MD, 800 gpm, 3120-3210 psi, 120 rpm, 6k Tq. Pulling speed reduced to 200-300 fph. to maintain ECD below 12.0 ppg EMW. Observing overpull, torque and pump pressure indicating slight packing off. 9/12/2016 9/12/2016 1.00 INTRM1 CASING BKRM T Pumped sweep around while 4,499.0 4,405.0 01:00 02:00 backreaming stand to 4,405' MD. Circulate 12.8 ppg sweep with 10 ppb Nut Plug around @ 800 gpm, 3240 psi, 150 rpm, 5.5k TQ, observed substantial increase in cuttings returns. Page 11/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth(ftKB) End Depth (ftKB) 9/12/2016 9/12/2016 0.75 INTRMI CASING BKRM' T Continue backreaming stand to 4,310' 4,405.0 4,310.0 02:00 02:45 MD while circulating additional 1.5 bottoms up due to observing overpull after sweep around. Perform 275 bbl whole mud dilution. 9/12/2016 9/12/2016 4.25 INTRMI CASING BKRM T Continue backreaming out of hole 4,310.0 3,461.0 02:45 07:00 from 4,310' MD to 3,461' MD, 800 gpm, 3120 psi, 120 rpm, 4k Tq. Pulling speed —600-700 fph maintaining ECD below 12.0 ppg EMW. Observing overpull, torque and pump pressure indicating slight packing off. 9/12/2016 9/12/2016 0.50 INTRM1 CASING BKRM T Pumped sweep around while 3,461.0 3,367.0 07:00 07:30 backreaming stand to 3,367' MD. Circulate 12.8 ppg sweep with 10 ppb Nut Plug around @ 800 gpm, 2670- 2340 psi, 150 rpm, 4.5k TQ, observed substantial increase in cuttings returns. 9/12/2016 9/12/2016 4.00 INTRM1 CASING BKRM T Continue backreaming out of hole 3,367.0 2,517.0 07:30 11:30 from 3,367' MD to 2,517' MD, 750 gpm, 2670-2340 psi, 120 rpm, 3-6k Tq. Varying pulling speed from 100- 500 fph maintaining ECD below 12.0 ppg EMW. Observing overpull, torque and pump pressure indicating packing off. Noted packoffs at 3255', 3250', 3244', 3237', 3172', 2752', 2739', 2602, 2593'. Hole unloaded @ 2,575' MD. 9/12/2016 9/12/2016 0.50 INTRMI CASING CIRC T Circulated 12.8 ppg weighted Nut Plug 2,517.0 2,517.0 11:30 12:00 sweep around @ 750 gpm, 2710-2360 psi, 120-150 rpm, 2.5-4k TQ. Hole unloaded large amounts of clay returns. 9/12/2016 9/12/2016 1.75 INTRMI CASING BKRM T Continue backreaming out of hole 2,517.0 2,328.0 12:00 13:45 from 2,517' MD to 2,328' MD, 750-800 gpm, 2260-2440 psi, 100-150rpm, 1.5- 3k Tq. Rotate 40 rpm pulling reamer, stabilizers and bit through shoe. Hole unloaded again @ 2,450' MD. 9/12/2016 9/12/2016 0.75 INTRM1 CASING CIRC T Circulate artound 32 bbl Nut Plug 2,328.0 2,328.0 13:45 14:30 sweep and CBU x 5 @ 795 gpm, 2160 -2350 psi, 100 rpm, 2-2.5k Tq. 9/12/2016 9/12/2016 2.00 INTRMI CASING OWFF P Rack back stand to 2,233' MD. Blow 2,328.0 2,233.0 14:30 16:30 down top drive. Flow check well, slight flow decreasing. Initial= 1.8 bph, Final= .74 bph. 9/12/2016 9/12/2016 0.50 INTRM1 CASING MPDA T Line up to strip out with MPD. Pump 2,233.0 2,233.0 16:30 17:00 @ 5 bpm, set chokes to hold 100 psi annular pressure. Observe mud flowing out drill string indicating floats not holding. Decision made to pull RCD and pull on elevators from shoe. 9/12/2016 9/12/2016 0.75 INTRM1 CASING MPDA P Pull RCD and strip element from pipe. 2,233.0 2,233.0 17:00 17:45 Install trip nipple. P/UI=120k, S/O=115k. Page 12/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 i; Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 9/12/2016 9/12/2016 0.50 INTRM1 CASING TRIP T POOH on elevators from 2,233' MD to 2,233.0 2,139.0 17:45 18:15 2,139' MD. Observe 3 bbl gain and 10- 15k overpull. Flow checked static, pulled 20' and observed severe swabbing, RBIH and observe mud being pushed away. BHA appears to be packed off with clay. Decision made to pump out of hole. 9/12/2016 9/12/2016 0.75 INTRM1 CASING PMPO T Pump out of hole from 2,139' MD to 2,139.0 1,760.0 18:15 19:00 1,760' MD @ 795 gpm, 2300-2740 psi. Observing large clay balls in decent quantities on shakers. 9/12/2016 9/12/2016 2.25 INTRM1 CASING BKRM T Added 30 rpm to clean up casing, 1,760.0 823.0 19:00 21:15 continued BROOH from 1,760' MD to 823' MD @ 795 gpm, 2300 psi, 30 rpm, 1-1.5k TQ. Shakers loaded up. 9/12/2016 9/12/2016 0.50 INTRM1 CASING CIRC T Pumped 34 bbl 10 ppb Nut Plug 823.0 823.0 21:15 21:45 sweep to clean BHA, circulate 3X bottoms up @ 795 gpm, 2360-2450 gpm, 30 rpm 1 k Tq until shakers cleaned up. Sweep brought back large chunks of hard clay, appeared to clean BHA. 9/12/2016 9/13/2016 2.25 INTRMI CASING OWFF P Blow down top drive and monitor well 823.0 823.0 21:45 00:00 for flow. Observe flow steady at .69 bph for first hour, then decreased only to .55 bph after 2 hours. Checking return flow via vis cup every 5 minutes. 9/13/2016 9/13/2016 1.00 INTRMI CASING OWFF P Continue OWFF. Initial flow .6 bph 823.0 823.0 00:00 01:00 measured at possum belly via vis cup. Observe flow reduce to static at possum belly and at flow nipple. 9/13/2016 9/13/2016 1.00 INTRM1 CASING TRIP T POOH on elevators from 831' MD to 823.0 541.0 01:00 02:00 541' MD. Calculated fill=5 bbl, Actual fill= 3bbl. Swabbing and observe 5-8k overpull on the last stand. PIU=90k, S/0=90k. 9/13/2016 9/13/2016 2.00 INTRM1 CASING BKRM T Backream out of hole from 541' MD to 541.0 181.0 02:00 04:00 181' MD, 650-450 gpm, 1450-620 psi, 60-30 rpm, .7k Tq. P/U=75k, S/0=75k. Stand back HWDP. Observe high ECD 12-13 ppg, no real cuttings returns on shakers. 9/13/2016 9/13/2016 2.00 INTRM1 CASING BHAH P POOH and UD BHA #2 from 181' MD 181.0 78.0 04:00 06:00 to 78' pumping 4 bpm 90 psi to avoid swab. L/D BHA per SLB DD/ MWD. (Note: Both floats damaged/failed. Flappers broken off and 5P float housing washed out.) 9/13/2016 9/13/2016 1.25 INTRM1 CASING OWFF P Observe well for flow, slight trickle 78.0 78.0 06:00 07:15 @ .5 bph measured with vis cup @ possum belly. SIMOPS- UD tools and equipment. 9/13/2016 9/13/2016 0.50 INTRM1 CASING BHAH P Continue UD BHA from 78' per SLB 78.0 0.0 07:15 07:45 DD/MWD reps. Monitor well on TT no measurable gain. Total trip Calculated fill 146 bbl, Actual Fill=588 bbl. Page 13/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) �. -: CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/13/2016 9/13/2016 3.00 INTRM1 CASING OWFF T Observe well for flow, slight trickle 0.0 0.0 07:45 10:45 @ .6 bph flow rate via vis cup. Flow not slowing down after 3 hrs. SIMOPS-M/U stack washer on joint of 5" DP, UD BHA tools and equip via beaver slide. Prep tool for C/O rams and test BOPE. NOV R/U to perform diagnostics on shakers. P/U bail extensions. 9/13/2016 9/13/2016 1.00 INTRM1 CASING OWFF T Close blind rams and perform exhale 0.0 0.0 10:45 11:45 test. Fill choke line, choke manifold, kill line and MGS with 10.8 ppg mud. Close choke and monitor pressure @ choke panel / manifold for 60 minutes. 10 psi built on choke. SIMOPS- PIU cleanout BHA components via beaverslide. 9/13/2016 9/13/2016 3.25 INTRMI CASING OWFF T Continue with exhale test. Open choke 0.0 61.0 11:45 15:00 and monitor returns @ MGS in pits .3 bph @ 12:00,.54 bph @ 12:45. Close choke @ 12:45. Pressure build to 15 psi @ 14:00 hrs, 23 psi @ 15:00 hrs. SIMOPS- M/U cleanout BHA to 61'. 9/13/2016 9/13/2016 1.50 INTRM1 CASING BHAH T Open blind rams and M/U cleanout 61.0 774.0 15:00 16:30 BHA # 3 to 774' MD. 9/13/2016 9/13/2016 0.50 INTRM1 CASING MPDA T Fill pipe and shut in annular. Adjust 774.0 774.0 16:30 17:00 pressure to strip in RCD for installation. 9/13/2016 9/13/2016 0.75 INTRM1 CASING MPDA T Pull trip nipple, stab bearing on stand 774.0 774.0 17:00 17:45 and install RCD bearing/element. Open annular. Observed no pressure increase on choke during installation, annular weeping due to low pressure for stripping in element. 9/13/2016 9/13/2016 1.25 INTRM1 CASING SMPD T Line up MPD and RIH on 5" DP from 774.0 2,280.0 17:45 19:00 774' MD to 2,280' MD holding 80 psi annular pressure with MPD chokes. Good pipe displacement 12-5 bbl per 5 stand closed end displacement. 9/13/2016 9/13/2016 0.25 INTRM1 CASING DHEQ T Fill pipe and shallow pulse test MWD 2,280.0 2,280.0 19:00 19:15 @ 450 gpm, 820 psi. 9/13/2016 9/13/2016 0.50 INTRM1 CASING CIRC T Circulate bottoms up @ 750 gpm, 2,280.0 2,280.0 19:15 19:45 1890 psi, 30 rpm, 2K TQ. Observed 10.8+ ppg mud out steady, no gas. 9/13/2016 9/13/2016 0.75 INTRM1 CASING OWFF T Shut in MPD chokes and monitor for 2,280.0 2,280.0 19:45 20:30 pressure buildup. Built 9 psi, from 5 to 14 psi in 10 minutes. Observed floats not holding and leaking out drill pipe. Consult with Eng and decide to continue running in hole. 9/13/2016 9/14/2016 3.50 INTRM1 CASING SMPD T Continue stripping in hole from 2.280' 2,280.0 5,972.0 20:30 00:00 MD to 5,972' MD, filling pipe every 20 stands, holding 80 psi annular pressure with MPD chokes. Good pipe displacement 12.5 bbl per 5 stand closed end displacement. P/U=150k, S/0=130k, ROT=123k. Page 14/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) ' CD5-99 a • •' r Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 9/14/2016 9/14/2016 1.50 INTRM1 CASING SMPD T Strip in hole with MPD holding 80 psi 5,972.0 7,371.0 00:00 01:30 annular pressure from 5,972' MD to 7,371' MD. Filling pipe every 20 stands. P/U=165k, S/0=125k, ROT= 145k. 7.67 bbl over calculated displacement. 9/14/2016 9/14/2016 1.00 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 7,371.0 7,371.0 01:30 02:30 750 gpm, 2650 psi, 120 rpm, 6k Tq. Gas peaked @ 310 units, ECD 11.45- 11.35 ppg EMW. Mud density out steady at 10.8-10.8+. 9/14/2016 9/14/2016 3.25 INTRM1 CASING SMPD T Continue stripping in hole with MPD 7,371.0 11,133.0 02:30 05:45 holding 80 psi annular pressure from 7,371' MD to 11,133' MD, filling pipe every 20 stands. P/U=207k, S/0=145k, ROT=170k. 1.85 bbl under calculated displacement. 9/14/2016 9/14/2016 1.50 INTRMI CASING CIRC T Circulate and condition bottoms up @ 11,133.0 11,133.0 05:45 07:15 750 gpm, 2170-3190 psi, 140 rpm, 11- 12k Tq. Gas peaked @ 261 units, ECD 11.52 ppg EMW. Mud density out steady at 10.8-10.8+. 9/14/2016 9/14/2016 0.75 INTRM1 CASING SMPD T Continue stripping in hole with MPD 11,133.0 11,886.0 07:15 08:00 holding 80 psi annular pressure from 11,133' MD to 11,886' MD. Observe flow increase from 12%-22%..78 bbl over calculated displacement. 9/14/2016 9/14/2016 0.50 INTRM1 CASING OWFF T OWFF, stab FOSV as precaution. 11,886.0 11,886.0 08:00 08:30 Shut down MPD pump and close MPD chokes to observe pressure build up. Monitor pressure every 5 minute= 24 psi, 25, 26, 26, 22, 20 psi while rotating 10 rpm, 12-13k Tq. 9/14/2016 9/14/2016 1.50 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 11,886.0 11,886.0 08:30 10:00 450-750 gpm, 14560-3320 psi, 140 rpm, 12-15.5k Tq. Mud extremely aired up, 25 bbl gain in pits at 4480 stks pumped. Add defoamer and pit level returned to normal. P/U=210k, S/0=150k, ROT=170k. 9/14/2016 9/14/2016 3.75 INTRM1 CASING SMPD T Continue stripping in hole with MPD 11,886.0 14,419.0 10:00 13:45 holding 120 psi annular pressure from 11,886' MD to 14,419' MD. 1 bbl over on displacement. P/U=235k, S/0=155k @ 13,482'. 9/14/2016 9/14/2016 1.50 INTRM1 CASING CIRC T Circulate and condition bottoms up @ 14,419.0 14,419.0 13:45 15:15 750 gpm, 2960-3530 psi, 150 rpm, 15- 19k Tq. Mud density out steady at 10.8-10.8+ with peak of 11.1 ppg, no light spots. 9/14/2016 9/14/2016 1.25 INTRM1 CASING CIRC T Continue stripping in hole with MPD 14,419.0 14,439.0 15:15 16:30 holding 120 psi annular pressure from 14,419' MD to 14,439' MD. Mud flowing up drillstring due floats not holding. Pump 800 gpm, 3230 psi to clear floats. Continue pumping 750 gpm, 2800 psi, 100 rpm, 15-16k Tq holding 90 psi on chokes. Page 15/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) w CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftK0) 9/14/2016 9/14/2016 4.25 INTRM1 CASING SMPD T Strip in hole holding 120-80 psi 14,439.0 15,619.0 16:30 20:45 annular pressure with MPD. Floats still not holding, screwing in to each connection. SIH from 14,419' MD to 15,619' MD, string took weight. Attempt to work through tight spot with up to 50K down weight without success. Decide to pull above HRZ and increase density prior to further efforts. 9/14/2016 9/14/2016 2.50 INTRM1 CASING SMPD T Strip out of hole from 15,619' MD to 15,619.0 14,888.0 20:45 23:15 14,888' MD holding 80 psi AP pulling and 40 psi in slips. Floats still not holding. 9/14/2016 9/15/2016 0.75 INTRMI CASING CIRC T Establish circulation stage up to 750 14,888.0 14,888.0 23:15 00:00 gpm, 2830-2930 psi, 130 rpm, 18-20k Tq. Begin weight up from 10.8 ppg to 11.1 ppg. 9/15/2016 9/15/2016 1.75 INTRMI CASING CIRC T Continue weighting up from 10.8 ppg 14,888.0 14,888.0 00:00 01:45 to 11.1 ppg @ 14,888' MD, 750 gpm, 2660 psi, 130 rpm, 19-20.5k Tq. Obtain new SPR's with 111.1 ppg mud. P/U=280k, S/0=150k, ROT=202k. 9/15/2016 9/15/2016 1.25 INTRMI CASING SMPD T Strip in hole from 14,888' MD to 14,888.0 15,544.0 01:45 03:00 15,544' MD. 9/15/2016 9/15/2016 2.25 INTRM1 CASING WASH T Wash down from 15,544' MD @ 2 15,544.0 15,521.0 03:00 05:15 bpm to 15,616' MD, slowly wash down to 15,521' MD would not pass any further with 40k WOB. Packing off periodically, from 270 to 350 psi, pull tight 50-75k over after working down. 9/15/2016 9/15/2016 0.25 INTRMI PLUG REAM T Begin rotation @ 120 rpm 20-24k Tq, 15,521.0 15,521.0 05:15 05:30 stage pump up to 550 gpm, 1880 psi attempt to ream down and packoff at 15,620' MD. 9/15/2016 9/15/2016 8.50 INTRM1 PLUG REAM T Coninue wash and ream with 400-600 15,521.0 15,670.0 05:30 14:00 gpm, 1040-1810 psi, 100-180 rpm, 22- 33k Tq. Numerous packoffs of 50-70 psi, stalling out top drive. Ream down to 15670' MD. P/U=290, S/O=150k, ROT=205k @ 15,653' MD. 9/15/2016 9/15/2016 0.50 INTRMI PLUG BKRM T Backream through tight spot from 15,670.0 15,634.0 14:00 14:30 15,670' MD to 15,634' MD @ 500 gpm, 1270-1300 psi, 100 rpm, 26k - 29k Tq. 9/15/2016 9/15/2016 0.75 INTRMI PLUG REAM T Wash and ream from 15,634' MD to 15,634.0 15,664.0 14:30 15:15 15,664' MD 500-625 gpm, 1300-1750 psi, 100-150 rpm, 25-31 k Tq, torquing up and difficult going down. (Decision made to POOH and plug back) 9/15/2016 9/15/2016 6.75 INTRMI PLUG BKRM T Backream out of hole from 15,664' MD 15,664.0 15,155.0 15:15 22:00 to 15,155' MD @ 625 gpm, 1500-1750 psi, 150 rpm, 25-30k Tq. Packing off and stalling out. Lost Hiline power @ 17:05, on generators. Back on Hiline @ 19:45 hrs. Page 16/73 Report Printed: 12/1/2016 { n Operations Summary (with Timelog Depths) f ...:, CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Stan Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/15/2016 9/16/2016 2.00 INTRM1 PLUG PMPO T Pump out of HRZ @ 3 bpm, 300-420 15,155.0 14,999.0 22:00 00:00 psi. Pulled up to 40k over, slack off and re -try, pull through @ 15,040' MD. S/0=310k. 9/16/2016 9/16/2016 0.25 INTRMI PLUG PMPO T Continue pumping out of hole from 14,999.0 14,888.0 00:00 00:15 14,999' MD to 14,888' MD above the HRZ @ 3.2 bpm, 380 psi. 9/16/2016 9/16/2016 1.75 INTRM1 PLUG CIRC T Circulate and condition @ 14,888' MD 14,888.0 14,888.0 00:15 02:00 stage from 550-800 gpm, 1180-2120 psi, 120-180 rpm, 22-26k TQ. P/U=310k, S/0=140k, ROT=205k. SIMOPS- PJSM on pulling MPD element and install trip nipple. 9/16/2016 9/16/2016 0.50 INTRMI PLUG MPDA T Flush MPD system and blow down 14,888.0 14,888.0 02:00 02:30 MPD chokes and lines. Pull RCD element and install trip nipple. 9/16/2016 9/16/2016 0.50 INTRM1 PLUG OWFF T Observe well for flow for 30 minutes, 14,888.0 14,888.0 02:30 03:00 static with slight drop about 1' in 30 min. Rotate string 5 rpm 19.5k Tq. 9/16/2016 9/16/2016 1.00 INTRM1 PLUG PMPO T Obtain SPR's with 11.1 ppg mud. 14,888.0 14,419.0 03:00 04:00 Continue pumping out of hole @ 4 bpm 250-300 psi from 14,888' MD to 14,419' MD, 5 stands. P/U=300k, S/0=145k. Calc fill=3.94 bbl, Actual Fill= 2 bbl inadequate fill 9/16/2016 9/16/2016 0.25 INTRMI PLUG OWFF T Observe well for flow, slight flow for 2 14,419.0 14,419.0 04:00 04:15 minutes then static with slight drop to V after 10 minutes. Decide to pull 5 more and observe displacement. 9/16/2016 9/16/2016 0.75 INTRM1 PLUG PMPO T Continue pumping out of hole from 14,419.0 13,951.0 04:15 05:00 14,419' MD to 13,951' MD 4 bpm 230 psi. Calc/actual fill = 3.94/4 bbl. Good displacement. 9/16/2016 9/16/2016 2.00 INTRMI PLUG PMPO T Continue pumping out of hole from 13,951.0 13,107.0 05:00 07:00 13,951' MD to 13,107' MD 4 bpm 200 psi. Calc/actual fill = 3.94/4 bbl per 5 stands. Good displacement. Observe washout in joint of DS50 drill pipe. Lay down bad joint (bottom of stand 132) and replace with good. 9/16/2016 9/16/2016 1.75 INTRMI PLUG PMPO T Continue pumping out of hole from 13,107.0 11,792.0 07:00 08:45 13,107' MD to 11,758' MD 4 bpm 410 psi. Good displacement. Pulled tight @ 11,758' pulled 45k over and 40k down to breakover. Drop down to 11,792' MD. P/U=225k, S/0=140k. 9/16/2016 9/16/2016 0.25 INTRMI PLUG BKRM T Backream out from 11,758' MD to 11,792.0 11,792.0 08:45 09:00 11,741' MD @ 550 gpm, 2080 psi, 120 rpm, 17k Tq. At 11,741' torque up to 27.5k. Decision made to CBU. Drop down to 11,792' MD. 9/16/2016 9/16/2016 1.25 INTRMI PLUG CIRC T Circulate and condition 1 bottoms up 11,792.0 11,792.0 09:00 10:15 from 550-750 gpm, 2080-3510 psi, 150 rpm, 15.5k -17.5k Tq. 9/16/2016 9/16/2016 2.00 INTRMI PLUG PMPO T Continue pumping out of hole from 11,792.0 10,286.0 10:15 12:15 11,792' MD to 10,286' MD 4 bpm 350 psi. Good displacement. P/U=210k, S/0=140k. 9/16/2016 9/16/2016 0.25 INTRM1 PLUG OWFF T Observe well static. Attempt to pull on 10,286.0 10,286.0 12:15 12:30 trip tank, swabbing. Page 17/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ItKS) End Depth (RKB) 9/16/2016 9/16/2016 1.75 INTRM1 PLUG PMPO T Continue pumping out of hole from 10,286.0 9,341.0 12:30 14:15 10,286' MD to 9,341' MD 3 bpm 270 psi. Pulled tight @ 10,122' MD with 45k overpull. Pull through and tight again @ 9,341' MD 45k over several times. Rotate pipe to free. Stop to CBU. 9/16/2016 9/16/2016 1.50 INTRMI PLUG CIRC T CBU from 9,341' MD to 9,245' MD @ 9,341.0 9,341.0 14:15 15:45 750 gpm, 3160 psi, 140 rpm, 11.8k Tq. Attempt to pull, pull 45k over decide to BROOH appears to be differential. 9/16/2016 9/17/2016 8.25 INTRMI PLUG BKRM T Backream out of hole from 9,245' MD 9,341.0 7,000.0 15:45 00:00 to 7,000' MD 550-750 gpm, 1860-2960 psi, 50-140 rpm, 10.5k-11.3k Tq. 9/17/2016 9/17/2016 0.50 INTRMI PLUG BKRM T Continue backreaming out from 7,000' 7,000.0 6,808.0 00:00 00:30 MD to 6,808' MD @ 750 gpm, 2760 psi, 140 rpm, 8k-10k Tq. 9/17/2016 9/17/2016 1.25 INTRM1 PLUG CIRC T CBU X 2 @ 750 gpm, 2710 psi, 180 6,808.0 6,808.0 00:30 01:45 rpm, 7.5k-9k TQ. Nothing notable on shakers. 9/17/2016 9/17/2016 5.25 INTRMI PLUG PMPO T Pump out of hole from 6,808' MD to 6,808.0 2,280.0 01:45 07:00 2,280' MD @ 4 bpm, 250-170 psi. P/U=120k, S/O=115k, ROT=118k. 9/17/2016 9/17/2016 0.75 INTRM1 PLUG CIRC T CBU X 2 @ 750 gpm, 2140 psi, 160 2,280.0 2,280.0 07:00 07:45 rpm, 2.5k TQ. CBU X 2 @ 800 gpm, 2320 psi, 160 rpm, 2.5k Tq. 4 bottoms up total. Nothing notable on shakers. Blow down top drive. 9/17/2016 9/17/2016 0.50 INTRM1 PLUG OWFF T Observe well for flow, static. 2,280.0 2,280.0 07:45 08:15 9/17/2016 9/17/2016 2.25 INTRM1 PLUG TRIP T POOH on elevators from 2,280' MD to 2,280.0 774.0 08:15 10:30 774' MD, good displacement. OWFF @ HWDP, static. 9/17/2016 9/17/2016 0.75 INTRM1 PLUG TRIP T Continue POOH on elevators rack 774.0 133.0 10:30 11:15 back HWDP to 133' MD. 9/17/2016 9/17/2016 1.25 INTRM1 PLUG BHAH T Lay down cleanout BHA per SLB 133.0 0.0 11:15 12:30 DD/MWD. Total trip Calc fill=124.88 bbl, Actual Fill=198.5 bbl. 9/17/2016 9/17/2016 0.50 INTRMI WHDBOP WWWH T Rig up stacj washer and flush 0.0 0.0 12:30 13:00 wellhead and stack @ 10 bpm, 110 psi. RID stack washer. 9/17/2016 9/17/2016 1.00 INTRM1 WHDBOP RURD T Rig up and pull wear ring as per FMC 0.0 0.0 13:00 14:00 rep. 9/17/2016 9/17/2016 0.50 INTRMI WHDBOP RURD T P/U 5" test joint and set test plug. Rig 0.0 0.0 14:00 14:30 up test equipment and fill all lines with water. 9/17/2016 9/17/2016 4.00 INTRMI WHDBOP BOPE T Test BOPE witnessed by AOGCC Jeff 0.0 0.0 14:30 18:30 Jones, test with 5" and 3%' test joints. Test annular to 250/2500 psi 5 min ea, Rams and valves 250/3500 psi 5 min ea, chokes drawdown test to 1100 psi. Tested annular, HCR choke/kill, choke valves #1, 12, 13, 14, Auto IBOP, upper rams, 4" Demco on kill line, CV #9, 11, manual, IBOP, HCR kill, needle valve above CV #1. CV# 5, 8, 10, 5" Dart valve, CV# 4, 6, 7, 5" FOSV, CV# 2, HCR choke, manual choke and kill. Lower rams. Page 18/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/17/2016 9/17/2016 0.50 INTRMI WHDBOP BOPE T Change out to 31/2'test joint. Perform 0.0 0.0 18:30 19:00 accumulator function test. System pressure=2950, Pressure after functioning= 1500 psi, 200 psi attained=27 sec, Full system recovery=147 sec. 4 bottle N2 average=2300 psi. 9/17/2016 9/17/2016 1.00 INTRM1 WHDBOP BOPE T Test annular to 250/2500 psi 5 min 0.0 0.0 19:00 20:00 each with 31/2' TJ, Upper rams, lower rams, pull TJ test blind rams all to 250/3500 psi. Drawdown test on manual and auto chokes to 1100 psi. Electrician tested gas alarms. 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP RURD T Blow down choke manifold, choke and 0.0 0.0 20:00 20:30 kill lines. Rig down test equipment. 9/17/2016 9/17/2016 0.50 INTRM1 WHDBOP RURD T Pull test plug, install 10" ID wear rig 0.0 0.0 20:30 21:00 per FMC rep. lay down 3%" test joint. 9/17/2016 9/17/2016 1.50 INTRM1 PLUG RURD T PJSM and change out DS -50 saver 0.0 0.0 21:00 22:30 sub on top drive. 9/17/2016 9/17/2016 0.75 INTRM1 PLUG SVRG T Service top drive and draw works. 0.0 0.0 22:30 23:15 Perform derrick inspection. 9/17/2016 9/18/2016 0.75 INTRM1 PLUG SLPC T Slip and cut 105' of drilling line. 0.0 0.0 23:15 00:00 9/18/2016 9/18/2016 1.00 INTRM1 PLUG SLPC T Continue cut and slip 105' of drilling 0.0 0.0 00:00 01:00 line, adjust brakes, springs, rollers. 9/18/2016 9/18/2016 1.00 INTRM1 PLUG RURD T Pick up and rig up tongs for P/U 3%" 0.0 0.0 01:00 02:00 cement stinger. 9/18/2016 9/18/2016 1.50 INTRM1 PLUG PULD T PJSM, M/U 3'/" Diffuser, 30 jts 31/2' 0.0 921.0 02:00 03:30 EUE and XO's to NC50 to 921' MD. 9/18/2016 9/18/2016 6.00 INTRM1 PLUG TRIP T Trip in hole on elevators from 921' MD 921.0 11,280.0 03:30 09:30 to 11,280' MD with cement stinger on 5" DP. P/U=200k, S/0=135k. 9/18/2016 9/18/2016 0.25 INTRM1 PLUG CIRC T Fill pipe, stage up from 3 bpm to 7 11,280.0 11,280.0 09:30 09:45 bpm, 450-720 psi. 9/18/2016 9/18/2016 2.25 INTRM1 PLUG TRIP T Trip in hole on elevators from 11,280' 11,280.0 13,629.0 09:45 12:00 MD to 13,629' MD with cement stinger on 5" DP filling each 20 stands. 9/18/2016 9/18/2016 4.50 INTRM1 PLUG TRIP T Trip in hole on elevators from 13,629' 13,629.0 16,310.0 12:00 16:30 MD to 16,318' MD with cement stinger on 5" DP filling each 20 stands. Lost slack off weight @ 16,318'. Pull up to 16,310' MD, P/U=350k. 9/18/2016 9/18/2016 2.00 INTRM1 PLUG CIRC T Attempt to break circulation, could not 16,310.0 16,201.0 16:30 18:30 establish, pressure up to 1500 psi string appears plugged. Work pipe, pull over 50k. Work pipe until free P/U=295k, S/0=145k pull up to 16,201' MD. Page 19173 Report Printed: 12/1/2016 h} Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 9/18/2016 9/18/2016 4.25 INTRMI PLUG TRIP T Continue working string out of hole 16,201.0 14,841.0 18:30 22:45 from 16,201' MD to 14,841' MD. Pulling 500 fph, applying pressure to drill pipe @ 500 psi still appears plugged. Hole fill insufficient. OWFF static and slight drop. Pull stand without trip tank and observe fluid falling in annulus. Pull 5 more stands on trip tank observe correct hole fill, pull 4 more stands to 14,841' MD above FC Slump to clear pipe. 9/18/2016 9/18/2016 0.25 INTRM1 PLUG OWFF T Observe well for flow for 10 minutes, 14,841.0 14,841.0 22:45 23:00 static dropped 6". 9/18/2016 9/18/2016 0.75 INTRMI PLUG CIRC T Rotate 20 rpm, 18.4k Tq, pressure up 14,841.0 14,841.0 23:00 23:45 string to 500 psi no returns. Line up to reverse circulate, close annular and apply 200 psi to annulus, pump 5 bbl away did not observe returns. Bleed off, open annular and line up to pump down string. Rotate 20 rpm 18.4k Tq and pressure up to 1000 psi and pressure dropped to 600, estabished circulation. 9/18/2016 9/19/2016 0.25 INTRM1 PLUG CIRC T Continue circulating for bottoms up, 3 14,841.0 14,841.0 23:45 00:00 bpm 590 psi, 20 rpm, 15k Tq. 9/19/2016 9/19/2016 0.50 INTRMI PLUG CIRC T Continue circulate and condition @ 3- 14,841.0 14,841.0 00:00 00:30 4 bpm, 590-600 psi, 20 rpm, 15k Tq. 9/19/2016 9/19/2016 3.00 INTRMI PLUG CIRC T Continue circulate and condition stage 14,841.0 14,841.0 00:30 03:30 up to 9 bpm, 1160 psi with no rotary. reciprocating pipe. P/U=255k, S/0=150k. 9/19/2016 9/19/2016 3.25 INTRM1 PLUG WASH T Wash down @ 3 bpm from 14,841' 14,841.0 15,930.0 03:30 06:45 MD to 15,930'420-490 psi. Stopped at 15,400' MD and increased rate to 8 bpm 930 psi briefly to test, clear no packing off.Continue in, start packing off at 15,930' MD. 9/19/2016 9/19/2016 0.25 INTRMI PLUG PMPO T Stand back 1 stand to 15,835' MD. 15,930.0 15,835.0 06:45 07:00 9/19/2016 9/19/2016 1.00 INTRM1 PLUG WASH T Attempt to wash down from 15,835' 15,835.0 15,868.0 07:00 08:00 MD to 15,868' MD @ 4 bpm 490-540 psi. Packing off @ 15,863', 15,868' MD. Decision to pull up to place HV pill. 9/19/2016 9/19/2016 1.00 INTRM1 PLUG PMPO T Pump out of hole from 15,868' MD to 15,868.0 15,691.0 08:00 09:00 15,691' MD @ 3 bpm, 490 psi. 9/19/2016 9/19/2016 1.25 INTRM1 PLUG CIRC T Spot 45 bbl 13.0 ppg HV Gel pill 15,691.0 15,691.0 09:00 10:15 balanced @ 15,691 9/19/2016 9/19/2016 0.75 INTRM1 PLUG TRIP T Pull out of hole on elevators from 15,691.0 15,410.0 10:15 11:00 15,691' MD to 15,410' MD. Calc fill=2.35 bbl, Actual fill +.5 bbl. 9/19/2016 9/19/2016 0.25 INTRMI PLUG RURD T Blow down top drive and R/U 1502 15,410.0 15,410.0 11:00 11:15 cementing equipment. 9/19/2016 9/19/2016 1.50 INTRMI PLUG CIRC T Circulate and condition for cement job 15,410.0 15,410.0 11:15 12:45 8 bpm, 1150 psi, reciprocate string from 15,410' MD to 15, 388' MD. P/U=265k, S/0=150k. SIMOPS- PJSM on cementing Page 20/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/19/2016 9/19/2016 1.00 INTRM1 PLUG CMNT T Flood lines and test to 2500 psi. 15,410.0 15,410.0 12:45 13:45 Dowell pumped 26.7 bbl 12.5 ppg Mud Push II, 91.9 bbl of 15.8 ppg Qannik Slurry, 3.7 bbl more bbl 12.5 ppg Mud Push II. 9/19/2016 9/19/2016 0.50 INTRM1 PLUG CMNT T Displace cement plug with 240 bbl 15,410.0 15,410.0 13:45 14:15 11.1 ppg Mud @ 6 bpm, 540-970 psi. CIP @ 14:19 hrs. 9/19/2016 9/19/2016 2.25 INTRMI PLUG TRIP T POOH on trip tank @ 500 fph from 15,410.0 14,472.0 14:15 16:30 15,410' MD to 14,472' MD, good pipe displacement. 9/19/2016 9/19/2016 2.50 INTRMI PLUG CIRC T Establish circulation and circulate 1 14,472.0 14,472.0 16:30 19:00 bottoms up, 13,000 strokes @ 10 bpm, 1360 psi. Observe slight increase in ph from 9.1 to 10.5, no observable cement. 9/19/2016 9/19/2016 4.50 INTRM1 PLUG WOC T Shut down and insert 5" drill pipe 14,472.0 14,472.0 19:00 23:30 wiper ball, continue circulating @ 10 bpm 1360 psi, observe -10 psi when ball hit diffuser. Continue circulating and waiting on cement. 9/19/2016 9/20/2016 0.50 INTRM1 PLUG WASH T Wash down @ 3 bpm 410 psi to locate 14,472.0 14,660.0 23:30 00:00 top of cement plug. 9/20/2016 9/20/2016 0.75 INTRM1 PLUG WASH T Wash down from 14,660' MD to 14,660.0 14,782.0 00:00 00:45 14,782' MD. Tag TOC with 5k, then 10k to confirm with 3 bpm, 440 psi. Firm cement @ 14,782' MD. 9/20/2016 9/20/2016 3.25 INTRM1 PLUG PMPO T Pump out of hole from 14,782' MD to 14,782.0 12,033.0 00:45 04:00 12,033' MD @ 3 bpm, 440-410 psi. 9/20/2016 9/20/2016 0.75 INTRM1 PLUG CIRC T Spot 90 bbl HV 13.0 ppg Gel pill @ 12,033.0 12,033.0 04:00 04:45 12,033' MD, 8 bpm 850 psi. Displace with 1740 stks. Reciprocate pipe while displacing. 9/20/2016 9/20/2016 1.50 INTRM1 PLUG TRIP T POOH on elevators from 12,033'to 12,033.0 0.0 04:45 06:15 11,405' MD to place kickoff plug. 9/20/2016 9/20/2016 0.25 INTRM1 PLUG RURD T Blow down top drive. RU 1502 cement 11,405.0 11,405.0 06:15 06:30 equipment and head pin. 9/20/2016 9/20/2016 1.75 INTRM1 PLUG CIRC T Circulate and condition mud at 8 bpm 11,405.0 11,405.0 06:30 08:15 990 psi. Simops - PU BHA components via the beaver slide. PJSM on cement job. 9/20/2016 9/20/2016 1.50 INTRMI PLUG CMNT T SLB pressure tested lines to 2800 psi. 11,405.0 11,405.0 08:15 09:45 Pumped 26.8 bbls 12.5 ppg spacer, 91.7 bbls 17 ppg cement, 3.5 bbls 12.5 spacer and rig dispalced with 140 bbls 11.1 ppg LSND mud. CIP - 09:32 hrs. RD cement equipment. Est TOC - 10,800' 9/20/2016 9/20/2016 1.75 INTRM1 PLUG TRIP T POH on trip tank from 11,405' to 11,405.0 10,339.0 09:45 11:30 10,339'. 9/20/2016 9/20/2016 0.50 INTRM1 PLUG CIRC T Circulate and condition mud at 10 bpm 10,339.0 10,339.0 11:30 12:00 - 1090 psi. 9/20/2016 9/20/2016 1.00 INTRM1 PLUG CIRC T Circulate and condition at 10 bpm, 10,339.0 10,339.0 12:00 13:00 1080 psi 9/20/2016 9/20/2016J 1.50 INTRM1 PLUG CIRC T Drop nerf ball and continue to circulate 10,339.0 10,339.0 13:00 14:30 and condition mud at 10 bpm, 1080 psi. Page 21173 Report Printed: 12/1/2016 - Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Code Time P -T -X Operation Depth (ftKB) End Depth (ftKB) 9/20/2016 9/20/2016 0.50 INTRM1 PLUG PMPO T Pump out of the hole from 10339' to 10,339.0 10,057.0 14:30 15:00 10057'@ 3 bpm, 320 psi to check for cement rings in drillpipe. Drillpipe clean 9/20/2016 9/20/2016 5.75 INTRMI PLUG WOC T Wait on cement while circulating at 10 10,057.0 10,057.0 15:00 20:45 bpm, 1080 psi. 9/20/2016 9/20/2016 0.25 INTRM1 PLUG WASH T Wash from 10057'to 10529'while 10,057.0 10,529.0 20:45 21:00 circulating at 3 bpm, 370 psi. Tag cement at 10529' with 5 kips. Pressure increased to 410 psi. Pick up and re -tag at 10529' with 10 kips to confirm TOC. 9/20/2016 9/20/2016 1.75 INTRMI PLUG CIRC T Circulate bottoms up at 10 bpm at 10,529.0 10,529.0 21:00 22:45 1150 psi. 9/20/2016 9/20/2016 0.25 INTRM1 PLUG OWFF T Monitor well for flow -no flow 10,529.0 10,529.0 22:45 23:00 9/20/2016 9/20/2016 0.25 INTRMI PLUG TRIP T Attempt to POOH on elevators. Hole 10,529.0 10,529.0 23:00 23:15 trying to swab. 9/20/2016 9/21/2016 0.75 INTRM1 PLUG PMPO T Pump out of hole at 3 bpm , 390 psi. 10,529.0 10,057.0 23:15 00:00 9/21/2016 9/21/2016 5.75 INTRM1 PLUG PMPO T Pump out of hole from 10,057'to 10,057.0 4,306.0 00:00 05:45 4306' at 4 bm - 290 psi. 9/21/2016 9/21/2016 1.00 INTRMI PLUG TRIP T POH on trip tank from 4306' to 4027'. 4,306.0 4,027.0 05:45 06:45 Hole taking good fill. Observed cement rings inside NC -50 connections. Decision was made to RIH to check middle breaks for cement rings before PU BHA. 9/21/2016 9/21/2016 0.25 INTRMI PLUG SFTY T PJSM on change of scope. Clean rig 4,027.0 4,027.0 06:45 07:00 floor. 9/21/2016 9/21/2016 7.50 INTRMI PLUG TRIP T RIH with 5" DP from derrick breaking 4,027.0 10,339.0 07:00 14:30 all connections to remove cement rings. There were no cement rings in the tool joint of the top joint on each stand. 9/21/2016 9/21/2016 3.50 INTRM1 PLUG CIRC T Make up top drive and break 10,339.0 10,339.0 14:30 18:00 circulation. Stage flowrate up to 11 bpm @ 1350 psi. Circulate and condition mud 9/21/2016 9/21/2016 0.50 INTRMI PLUG OWFF T Blow down top drive and monitor well. 10,339.0 10,339.0 18:00 18:30 Static 9/21/2016 9/21/2016 1.50 INTRMI PLUG TRIP T Pull out of hole on elevators. Proper 10,339.0 9,394.0 18:30 20:00 fill on first 5 stand. 2nd 5 stand had improper fill. 9/21/2016 9/22/2016 4.00 INTRMI PLUG PMPO T Pump out of the hole from 9394' to 9,394.0 5,730.0 20:00 00:00 5730' while pumping 3 bpm @ 350 psi. 9/22/2016 9/22/2016 0.75 INTRM1 PLUG PMPO T Pump out of hole at 3 bpm - 330 psi 5,730.0 5,070.0 00:00 00:45 from 5730' to 5070'. 9/22/2016 9/22/2016 1.25 INTRMI PLUG TRIP T POH on trip tank from 5070' to 4220'. 5,070.0 4,220.0 00:45 02:00 Good hole fill. 9/22/2016 9/22/2016 0.50 INTRMI PLUG CIRC T Pump 18.5 bbls 12.1 ppg dry job. Blow 4,220.0 4,220.0 02:00 02:30 down top drive. Clean floor and RD mud bucket. 9/22/2016 9/22/2016 3.75 INTRMI PLUG TRIP T POH on trip tank from 4220' to 2237'. 4,220.0 2,237.0 02:30 06:15 Break each connection to clean out cement rins in tools joints.. 9/22/2016 9/22/2016 0.25 INTRM1 PLUG OWFF T Monitor well at shoe. Static 2,237.0 2,237.0 06:15 06:30 1 Page 22/73 Report Printed: 12/112016j Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/22/2016 9/22/2016 1.75 INTRMI PLUG TRIP T POH on trip tank from 2237' to 921'. 2,237.0 921.0 06:30 08:15 Break each connection to clean out cement rings in tools joints.. 9/22/2016 9/22/2016 0.50 INTRM1 PLUG RURD T RU 3 1/2" handling equipment and 921.0 921.0 08:15 08:45 power tongs. 9/22/2016 9/22/2016 1.75 INTRMI PLUG PULD T PJSM. POH and LD 3 1/2" cement 921.0 0.0 08:45 10:30 string. 9/22/2016 9/22/2016 1.50 INTRMI PLUG RURD T Clear rig floor. Rig down tubing tongs 0.0 0.0 10:30 12:00 and elevators. Clean pollution pan and flow box of cement contaminated mud. Change out trip tank hole fill line. Laydown 3-1/2" diffuxer and sent to mechanic shop for retrieval of nerf balls. Pre tools for BOPE test. Inspect #2 mud pump valves and sets - OK. 9/22/2016 9/22/2016 0.50 INTRMI PLUG RURD T Finish cleaning drip pan under rig 0.0 0.0 12:00 12:30 floor. 9/22/2016 9/22/2016 0.75 INTRM1 WHDBOP RURD T Rig up 5" test joint and pull wear ring. 0.0 0.0 12:30 13:15 Install test joint 9/22/2016 9/22/2016 0.75 INTRM1 WHDBOP RURD T Rig up test equipment and fill lines 0.0 0.0 13:15 14:00 with water. Bleed air out of lines. Monitor well on trip tank 9/22/2016 9/22/2016 4.50 INTRMI WHDBOP BOPE T Test BOPE with 5" test joint. Test all 0.0 0.0 14:00 18:30 components to 250/3500 psi except for annular which was tested to 250/2500 psi. Tested accumulator, gas alarms, PVT alarms and super choke. Accumulator pressure = 2950 psi, manifold pressure = 1450 psi, Drawdown manifold pressure to 1300 psi. 200 psi increase in 20 sec. TSR = 145 seconds. 4 nitrogen bottles at 2300 psi. 9/22/2016 9/22/2016 0.50 INTRM1 WHDBOP RURD T Remove test joint and install wear ring 0.0 0.0 18:30 19:00 (I.D.=10") 9/22/2016 9/22/2016 2.75 INTRM1 PLUG BHAH T PJSM. Makeup sidetrack BHA 0.0 820.0 19:00 21:45 9/22/2016 9/22/2016 1.25 INTRMI PLUG TRIP T RIH from 820' to 2515' 820.0 2,515.0 21:45 23:00 9/22/2016 9/22/2016 0.75 INTRM1 PLUG SRVY T Fill drillpipe and take quadedrant 2,515.0 2,515.0 23:00 23:45 surveys at 450 gpm, 1050 psi. 9/22/2016 9/23/2016 0.25 INTRMI PLUG TRIP T POOH from 2515' to 2325' 2,515.0 2,325.0 23:45 00:00 9/23/2016 9/23/2016 1.00 INTRM1 PLUG SLPC T Hang blocks. Slip and cut 60' of drilling 2,325.0 2,325.0 00:00 01:00 line. 9/23/2016 9/23/2016 0.75 INTRM1 PLUG SVRG T Service top drive and drawworks. Re- 2,325.0 2,325.0 01:00 01:45 install SLB sensor above deadman. Calibrate block height. 9/23/2016 9/23/2016 8.00 INTRM1 PLUG TRIP T RIH with 5" DP from 2325' to 10,137'. 2,325.0 10,137.0 01:45 09:45 Fill pipe every 20 stds. Take MWD surveys. Started taking wt at 10,137'. 9/23/2016 9/23/2016 2.25 INTRM1 PLUG REAM T Break circulation. Stage pumps up to 10,137.0 10,213.0 09:45 12:00 425 gpm at 1710 psi. Ream hole from 10,137' to 10,213' while conditioning mud. ECD - 11.97/12.0 ppg. Page 23/73 Report Printed: 12/1/2016 a '4 Operations Summary (with Timelog Depths) A r,� .•:. CD5-99 4 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/23/2016 9/23/2016 4.75 INTRMI PLUG REAM T Continue washing and reaming from 10,213.0 10,529.0 12:00 16:45 10,213' to 10529'. Pump from 425 to 700 gpm at 1710 to 3630 psi. 60-150 rpm, Torque = 15k to 20.6 k 9/23/2016 9/23/2016 2.25 INTRM1 PLUG KOST T Attempt to side track from 10529' to 10,529.0 10,612.0 16:45 19:00 10612'. Observed increase in flo- show. 9/23/2016 9/23/2016 0.25 INTRMI PLUG OWFF T Observe well for flow. Slight trickle. 10,612.0 10,612.0 19:00 19:15 Mud out of balance. No gas or pit gain. 9/23/2016 9/23/2016 0.75 INTRM1 PLUG KOST T Attempt to sidetrack from 10612' to 10,612.0 10,640.0 19:15 20:00 10776'. Observed flow -show increase from bottoms up. Observed well for 5 minutes -static. 9/23/2016 9/23/2016 2.50 INTRM1 PLUG KOST T Attempt to side track from 10640' to 10,640.0 1,076.0 20:00 22:30 10776'. 9/23/2016 9/23/2016 0.50 INTRMI PLUG KOST T Trough from 10756' to 10776' with 700 10,776.0 10,776.0 22:30 23:00 gpm, 3900 psi, 140 rpm 9/23/2016 9/24/2016 1.00 INTRMI PLUG KOST T Time drill from 10776' to 10801' 10,776.0 10,801.0 23:00 00:00 9/24/2016 9/24/2016 1.50 INTRM1 PLUG KOST T Wash and clean out soft cement from 10,801.0 10,896.0 00:00 01:30 10801' to 10896' attempting to sidetrack 9/24/2016 9/24/2016 2.25 INTRM1 PLUG KOST T Start troughing from 10896' to 10898'. 10,896.0 10,898.0 01:30 03:45 BHA hanging up. No transfer of weight to bit. 9/24/2016 9/24/2016 0.50 INTRMI PLUG JAR T Unable to pick up and topdrive stalling 10,898.0 10,898.0 03:45 04:15 out. Pick up single to work drillstring. Hit jars 1 time at 100kips over string weight and string free. 9/24/2016 9/24/2016 1.75 INTRM1 PLUG CIRC T Coirculate and reciprocate while 10,898.0 10,898.0 04:15 06:00 pumping sweep out of the hole. 9/24/2016 9/24/2016 6.00 INTRM1 PLUG BKRM T Back ream out of the hole from 10898' 10,898.0 9,865.0 06:00 12:00 to 9865' 9/24/2016 9/25/2016 12.00 INTRMI PLUG BKRM T Continue back reaming out of hte hole 9,865.0 8,640.0 12:00 00:00 from 9865' to 8640' with 550 gpm, 2450 psi, 120 rpm. ROT = 160 kips, 16-18 k ft -lbs torque. ECD = 11.68 9/25/2016 9/25/2016 8.75 INTRM1 PLUG BKRM T Continue back reaming out of hte hole 8,640.0 6,857.0 00:00 08:45 from 8640' to 6857' with 550 gpm, 2450 psi, 120 rpm. ROT = 160 kips, 16-18 k ft -lbs torque. ECD = 11.55 9/25/2016 9/25/2016 1.50 INTRMI PLUG PMPO T Pump out of hole from 6857' to 6099' 6,857.0 6,099.0 08:45 10:15 at 7 bpm - 700 psi. Up wt - 170k. Dn wt - 120k. 9/25/2016 9/25/2016 0.75 INTRM1 PLUG BKRM T Tight hole at 6099'. Back ream out of 6,099.0 5,817.0 10:15 11:00 hte hole from 6099' to 5817' with 500 gpm, 2050 psi, 120 rpm. ROT = 140 kips, 10-12 k ft -lbs torque. ECD = 11.55 9/25/2016 9/25/2016 1.00 INTRM1 PLUG PMPO T Pump out of hole from 5817' to 5346' 5,817.0 5,346.0 11:00 12:00 at 7 bpm - 670 psi. Up wt - 175k. Dn wt - 115k. 9/25/2016 9/25/2016 0.50 INTRM1 PLUG PMPO T Pump out of hole from 5346' to 5066' 5,346.0 5,066.0 12:00 12:30 at 7 bpm - 680 psi. Tight spot at 5066'. Page 24173 Report Printed: 12/1/2016 Operations Summary Timelog Depths) (with C D5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/25/2016 9/25/2016 1.50 INTRM1 PLUG BKRM T Back ream out of hole from 5066' to 5,066.0 4,875.0 12:30 14:00 4875'. Stalled out at 5035'. Attemped to free pipe with bumber sub. No success. Used torgue and slump to free pipe. Continue backream out of hole to 4875' at 500 gpm - 680 psi. 9/25/2016 9/25/2016 0.50 INTRMI PLUG PMPO T Pump out of hole from 4875' to 4710'. 4,875.0 4,710.0 14:00 14:30 Hole was tight and sticky. 9/25/2016 9/26/2016 9.50 INTRM1 PLUG BKRM T Backream out of the hole from 4710' 4,710.0 2,548.0 14:30 00:00 to 2548' with 500 gpm, 1460 psi @ 120 rpm and 5.2 k -ft -lbs torque. 9/26/2016 9/26/2016 1.25 INTRM1 PLUG PMPO T Pull BHA through csg shoe while 2,548.0 2,325.0 00:00 01:15 pumping 700 gpm - 2020 psi. Pull 15k over on 1 st stab. Comfirmed that underreamer was not open. 9/26/2016 9/26/2016 0.50 INTRMI PLUG CIRC T CBU at 700 gpm - 2020 psi - 120 rpms 2,325.0 2,325.0 01:15 01:45 - 4.5k tq. 9/26/2016 9/26/2016 0.25 INTRMI PLUG OWFF T Flow check well. Static. 2,325.0 2,325.0 01:45 02:00 9/26/2016 9/26/2016 2.25 INTRM1 PLUG PMPO T Pump out of hole from 2325' to 820' at 2,325.0 820.0 02:00 04:15 7 bpm at 500 psi. 9/26/2016 9/26/2016 0.25 INTRMI PLUG OWFF T Flow check well for 10 min. Static. 820.0 820.0 04:15 04:30 PJSM for BHA. Line up trip tank. 9/26/2016 9/26/2016 0.50 INTRMI PLUG TRIP T PCH from 820' to 175' standing back 820.0 175.0 04:30 05:00 HWDP and jars. 9/26/2016 9/26/2016 2.00 INTRM1 PLUG BHAH T POH. Inspect and clean BHA. No 175.0 0.0 05:00 07:00 damage observed. 9/26/2016 9/26/2016 0.50 INTRM1 PLUG BHAH T Clear and clean rig floor. 0.0 0.0 07:00 07:30 9/26/2016 9/26/2016 1.25 INTRM1 PLUG BOPE T Drain stack. Pull wear bushing. RU to 0.0 0.0 07:30 08:45 test BOP. 9/26/2016 9/26/2016 1.25 INTRMI PLUG BOPE T Install 3 1/2" test jt. Test bag to 0.0 0.0 08:45 10:00 250/2500 psi. Test upper and lower pipe rams to 250/3500 psi. 9/26/2016 9/26/2016 0.50 INTRM1 PLUG BOPE T RD test equipment. Drain stack. Install 0.0 0.0 10:00 10:30 wear bushing. 9/26/2016 9/26/2016 0.75 INTRM1 PLUG RURD T RU to run 3 1/2" tbg. 0.0 0.0 10:30 11:15 9/26/2016 9/26/2016 2.75 INTRM1 PLUG PULD T Pick up 3-1/2" mleshoe and RIH with 3 0.0 950.0 11:15 14:00 -1/2" cement stinger to 950' 9/26/2016 9/26/2016 7.50 INTRM1 PLUG TRIP T RIH with cement stinger on 5" drillpipe 950.0 8,015.0 14:00 21:30 from 950' to 8015' 9/26/2016 9/26/2016 2.00 INTRM1 PLUG CIRC T Circulate bottoms up and condition 8,015.0 8,015.0 21:30 23:30 mud @ 8 bpm, 600 psi 9/26/2016 9/27/2016 0.50 INTRM1 PLUG CIRC T Spot 90 bbl hi-vis13.6 ppg pill at 8 81015.0 8,015.0 23:30 00:00 bpm, 790 psi. 9/27/2016 9/27/2016 1.00 INTRM1 PLUG TRIP T POOH @ 800 ft/hr f/7,920' to 7,329' 7,920.0 7,329.0 00:00 01:00 9/27/2016 9/27/2016 0.25 INTRM1 PLUG RURD T B/D top drive. R/U head pin & cement 7,329.0 7,329.0 01:00 01:15 lines. 9/27/2016 9/27/2016 1.50 INTRM1 PLUG CIRC T Circ B/U w/8 bpm @ 840 psi. 7,329.0 7,329.0 01:15 02:45 Page 25173 Report Printed: 12/1/2016 ' Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/27/2016 9/27/2016 1.00 INTRM1 PLUG CMNT T Dowell pressure test lines to 2500 psi 7,329.0 7.329.0 02:45 03:45 (good). Pump 26.4 bbis 12.5 ppg mud push, 91.7 bbls 15.8 ppg 1.16 yld class G cement, 3.6 bbls 12.5 ppg mud push. Rig displace w/90 bbls 11.1 ppg LSND Initial 6 bpm @ 210 - 550 psi, Final 3 bpm @ 260 psi. 9/27/2016 9/27/2016 1.25 INTRM1 PLUG TRIP T POOH @ 800 ft/hr f/7,329' to 6,513' 7,329.0 6,513.0 03:45 05:00 9/27/2016 9/27/2016 3.50 INTRM1 PLUG CIRC T Circ B/U w/650 gpm @ 1690 psi. 6,513.0 6,513.0 05:00 08:30 Pump foam ball and chase w/30 bbls water & circ surface to surface w/755 gpm @ 2060 psi. 9/27/2016 9/27/2016 2.00 INTRM1 PLUG PMPO T Pump OOH (/6,513' to 5,665' 6,513.0 5,665.0 08:30 10:30 9/27/2016 9/27/2016 1.50 INTRM1 PLUG TRIP T RIH 9 stands breaking each 5,665.0 6,509.0 10:30 12:00 connection checking for cement rings f/5,665' to 6,509' 9/27/2016 9/27/2016 4.00 INTRM1 PLUG WOC T Circ & cond mud & W.O.C. to cure 6,509.0 6,509.0 12:00 16:00 w/630 - 400 gpm 1640 - 700 psi 9/27/2016 9/27/2016 0.50 INTRM1 PLUG WASH T Wash in hole w/1 - 2 bpm @ 140 psi & 6,509.0 6,607.0 16:00 16:30 tag T.O.0 @ 6,607' Cement plug tag witnessed by Johnny Hill of the AOGCC. 9/27/2016 9/27/2016 1.50 INTRM1 PLUG CIRC T Circ B/U w/650 gpm @ 1580 psi. Rack 6,607.0 6,509.0 16:30 18:00 back 1 stand to 6,509' 9/27/2016 9/27/2016 0.25 INTRM1 PLUG OWFF T F/C (static) 6,509.0 6,509.0 18:00 18:15 9/27/2016 9/27/2016 3.00 INTRM1 PLUG TRIP T POOH f/6,509' to 3,337' 6,509.0 3,337.0 18:15 21:15 9/27/2016 9/27/2016 1.00 INTRM1 PLUG CIRC T Circ B/U w/400 gpm @ 560 psi. Spot 3,337.0 3,337.0 21:15 22:15 90 bbls high vis gel spacer. 9/27/2016 9/27/2016 1.00 INTRM1 PLUG TRIP T POOH f/3,337' to 2,737' 3,337.0 2,737.0 22:15 23:15 9/27/2016 9/28/2016 0.75 INTRM1 PLUG CIRC T Circ & cond mud for cement job w/400 2,737.0 2,737.0 23:15 00:00 gpm @ 500 psi. 9/28/2016 9/28/2016 0.50 INTRM1 PLUG CIRC T Circ & cond mud for cement job w/400 2,737.0 2,737.0 00:00 00:30 gpm @ 500 psi. PJSM on cementing 9/28/2016 9/28/2016 0.25 INTRM1 PLUG RURD T B/D top drive. R/U cement lines. 2,737.0 2,737.0 00:30 00:45 9/28/2016 9/28/2016 0.75 INTRMI PLUG CMNT T Dowell pressure test lines to 2500 psi 2,737.0 2,737.0 00:45 01:30 (good). Pump 24.7 bbls 12.5 ppg mud push, 85 bbls 17.0 ppg 1.0 yld class G cement, 5.3 bbls 12.5 ppg mud push. Rig displace w/15 bbls 11.1 ppg LSND w/3 bpm @ 250 psi. 9/28/2016 9/28/2016 1.50 INTRM1 PLUG TRIP T POCH f/2,739'to 1,890' 2,737.0 1,890.0 01:30 03:00 9/28/2016 9/28/2016 1.50 INTRM1 PLUG CIRC T Circ B/U w/700 gpm @ 960 psi 1,890.0 1,890.0 03:00 04:30 9/28/2016 9/28/2016 1.00 INTRM1 PLUG OTHR T Check 9 stands via mouse hole from 1,890.0 1,890.0 04:30 05:30 trip out for cement rings. Shuffle from DS to ODS 9/28/2016 9/28/2016 0.75 INTRM1 PLUG TRIP T POOH f/1,890' to 950' (tool joints 1,890.0 950.0 05:30 06:15 covered in caly) 9/28/2016 9/28/2016 1.75 INTRM1 PLUG RURD T Attempt to POOH. Mud was thick & 950.0 950.0 06:15 08:00 not draining from tubing. R/U XO, safety valve & head pin. Page 26/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) x , CD5-99 t Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 9/28/2016 9/28/2016 0.50 INTRM1 PLUG CIRC T Circ thru tubing 100 bbls 950.0 950.0 08:00 08:30 9/28/2016 9/28/2016 1.50 INTRM1 PLUG PULD T POOH & UD 30 its 3 1/2" tubing (clay 950.0 0.0 08:30 10:00 & cement balled up around tool jts) 9/28/2016 9/28/2016 1.00 INTRM1 PLUG RURD T Clean & clear floor. FMC pull wear 0.0 0.0 10:00 11:00 ring. R/D 3 1/2" hande equipment. 9/28/2016 9/28/2016 0.50 INTRM1 WHDBOP WWWH T M/U stack washer & flush stack. 0.0 0.0 11:00 11:30 9/28/2016 9/28/2016 1.00 INTRM1 WHDBOP RURD T R/U to test BOPE. Flood lines w/H20 0.0 0.0 11:30 12:30 9/28/2016 9/28/2016 5.00 INTRM1 WHDBOP BOPE T BOPE Test: Test with 5" test joint, 0.0 0.0 12:30 17:30 Test Annular to 250/2,500 psi for 5 min, Test choke valves #1 - 14 and needle valve to 250/3,500 psi for 5 min. HCR Choke and Kill, 4" Demco, 5" FOSV, dart & needle valves, auto & manual IBOP, HCR choke & kill, 3 1/2" X 6" upper & lower VBR's, & blind rams to 250/3500 psi for 5 min. Koomey test; IP= 3,000 psi, press after close = 1,675 psi, 200 psi recovery 26 sec, full recovery 122 sec, N2- 4 bottle average= 2100 psi. Tested gas alarms. Draw down on man & super choke to 1,100 psi. - Test waived by Johnny Hill of the AOGCC. 9/28/2016 9/28/2016 1.00 INTRM1 WHDBOP RURD T R/D testing equipment. B/D lines. 0.0 0.0 17:30 18:30 FMC install wear ring (10" ID) 9/28/2016 9/28/2016 2.25 INTRM1 PLUG SVRG T C/O saver sub on top drive. Service 0.0 0.0 18:30 20:45 top drive, draw works, & iron roughneck 9/28/2016 9/28/2016 0.50 INTRM1 PLUG TRIP T M/U mule shoe & RIH 3 stands HWDP 0.0 278.0 20:45 21:15 to 278' 9/28/2016 9/28/2016 1.25 INTRM1 PLUG SLPC T Slip & cut 45' drill line. Calibrate block 278.0 278.0 21:15 22:30 height. 9/28/2016 9/28/2016 1.00 INTRM1 PLUG OTHR T Calibrate block height for MWD 278.0 278.0 22:30 23:30 9/28/2016 9/28/2016 0.25 INTRM1 PLUG TRIP T POOH 3 stands HWDP f/278' 278.0 0.0 23:30 23:45 9/28/2016 9/29/2016 0.25 INTRM1 PLUG BHAH T PJSM on BHA. P/U power drive & set 0.0 0.0 23:45 00:00 in rotary table. Prep BHA tools & equipment. 9/29/2016 9/29/2016 1.50 INTRM1 PLUG BHAH T M/U BHA #6 as per SLB 0.0 820.0 00:00 01:30 9/29/2016 9/29/2016 1.00 INTRM1 PLUG TRIP T RIH f/820'to 1,761' 820.0 1,761.0 01:30 02:30 9/29/2016 9/29/2016 0.25 INTRM1 PLUG DHEQ T Shallow hole test MWD. 1,761.0 1,761.0 02:30 02:45 9/29/2016 9/29/2016 3.75 INTRM1 PLUG REAM T W&R f/1,761' to 2,523' looking for top 1,761.0 2,523.0 02:45 06:30 of cement w/675 gpm, 2000 psi, 30 rpm, 3 k trq. Tag top of cement @ 2,523' 9/29/2016 9/29/2016 1.25 INTRM1 PLUG KOST T Establish drilling parameters. Attempt 2,523.0 2,538.0 06:30 07:45 to side track (/2,523' to 2,538' (trouble with MWD detection) 9/29/2016 9/29/2016 2.75 INTRM1 PLUG DISP T Trouble shoot MWD. Displace well to 2,538.0 2,538.0 07:45 10:30 new 9.6 ppg LSND Page 27173 Report Printed: 12/1/2016 f Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 9/29/2016 9/29/2016 4.00 INTRMI PLUG KOST T Attempt to get kicked off f/2,538' to 2,538.0 2,677.0 10:30 14:30 2,677' with no success. Various cement stringers. Tag up on what appears to be hard cement @ 2,677'. Decision made to pump second kick off plug. 9/29/2016 9/29/2016 1.00 INTRM1 PLUG CIRC T Circ B/U w/650 gpm, 1670 psi, 30 2,677.0 2,609.0 14:30 15:30 rpm, 3.4 k trq. Pump 30 bbl nut plug sweep. 9/29/2016 9/29/2016 0.25 INTRMI PLUG OWFF T F/C (static) 2,609.0 2,609.0 15:30 15:45 9/29/2016 9/29/2016 2.25 INTRM1 PLUG TRIP T POOH f/2,609' to 178' (rack back 2,609.0 178.0 15:45 18:00 HWDP & jars) 9/29/2016 9/29/2016 1.75 INTRM1 PLUG BHAH T UD BHA as per SLB 178.0 0.0 18:00 19:45 9/29/2016 9/29/2016 0.75 INTRMI PLUG BHAH T Clean & clear floor of BHA tools & 0.0 0.0 19:45 20:30 equipment. R/U 3 1/2" handling equipment 9/29/2016 9/29/2016 1.75 INTRM1 PLUG PULD T RIH while picking up 3 1/2" tubing 0.0 945.0 20:30 22:15 cement string 9/29/2016 9/29/2016 0.25 INTRM1 PLUG RURD T C/O handle equipment 945.0 945.0 22:15 22:30 9/29/2016 9/29/2016 1.00 INTRM1 PLUG TRIP T RIH with 5" DP f/945' to 2,548'. 945.0 2,548.0 22:30 23:30 9/29/2016 9/30/2016 0.50 INTRMI PLUG TRIP T Wash in hole f/2,548' &TOC @ 2,683' 2,548.0 2,670.0 23:30 00:00 w/2 bpm @ 130 psi. L/D single joint to 2,670' 9/30/2016 9/30/2016 7.50 INTRMI PLUG CIRC T Circ & cond mud while wait on Dowell 2,670.0 2,670.0 00:00 07:30 cementers & cement lab results. 500 gpm, 330 psi 9/30/2016 9/30/2016 0.25 INTRM1 PLUG RURD T B/D top drive. R/U head pin and 2,670.0 2,670.0 07:30 07:45 cement lines 9/30/2016 9/30/2016 6.75 INTRMI PLUG CIRC T Circ & cond mud while wait on Dowell 2,670.0 2,670.0 07:45 14:30 cementers & cement lab results. 400 gpm, 500 psi 9/30/2016 9/30/2016 1.50 INTRM1 PLUG CMNT T Dowell pressure test lines to 2200 psi 2,670.0 2,670.0 14:30 16:00 (good). Pump 24.8 bbls 12.5 ppg mud push, 119 bbls 17.0 ppg 1.0 yld class G neat cement, 5.2 bbls 12.5 ppg mud push w/4 bpm @ 140 - 120 psi. Rig displace w/20 bbis 9.6 ppg LSND, ICP 8 bpm @ 140 psi, FCP 4 pbm @ 80 psi. 9/30/2016 9/30/2016 1.00 INTRMI PLUG TRIP T POOH f/2,670' to 2,137'@ 800 fUhr. 2,670.0 2,137.0 16:00 17:00 (DP on vac) 9/30/2016 9/30/2016 1.50 INTRM1 PLUG CIRC T Circ & cond mud w/650 - 500 gpm. 2,137.0 2,137.0 17:00 18:30 Observe mud push to surface. (No cement to surface). Drop foam wiper ball, chase w/30 bbls H2O and circ DP clean. 9/30/2016 9/30/2016 1.50 INTRM1 PLUG OTHR T F/C (static). Mouse hole 5 stands of 2,137.0 2,137.0 18:30 20:00 DP used for cementing. Break & inspect tool joints for cement. Rack back on ODS. 9/30/2016 9/30/2016 2.00 INTRM1 PLUG TRIP T POOH f/2,137' to 950' inspecting tool 2,137.0 950.0 20:00 22:00 joints for cement. 9/30/2016 9/30/2016 0.50 INTRM1 PLUG TRIP T PJSM on UD tubing. R/U 3 1/2" 950.0 950.0 22:00 22:30 handling equipment. 9/30/2016 10/1/2016 1.50 INTRM1 PLUG PULD T POOH f/950'& L/D 3 1/2" cement 950.0 0.0 22:30 00:00 string. Page 28/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (WEI) End Depth (ftKB) 10/1/2016 10/1/2016 0.75 INTRM1 PLUG BHAH T Clean &clear floor of BHA tools & 0.0 0.0 00:00 00:45 equip. M/U 5" handling equip. 10/1/2016 10/1/2016 1.00 INTRMI PLUG WWWH T M/U stack washer & flush stack. 0.0 0.0 00:45 01:45 10/1/2016 10/1/2016 0.50 INTRM1 PLUG RURD T - B/D top drive. Drain BOPE. Flush kill 0.0 0.0 01:45 02:15 & choke lines. 10/1/2016 10/1/2016 1.75 INTRM1 PLUG BHAH T M/U kick off mud motor BHA #6 as per 0.0 68.0 02:15 04:00 SLB to 68' 10/1/2016 10/1/2016 1.00 INTRMI PLUG TRIP T RIH f/68'to 1,931' 68.0 1,931.0 04:00 05:00 10/1/2016 10/1/2016 0.25 INTRM1 PLUG DHEQ T Shallow hole test MWD 1,931.0 1,931.0 05:00 05:15 10/1/2016 10/1/2016 0.50 INTRMI PLUG REAM T W&R f/1,931' to 2,139'w/200 gpm, 1,931.0 2,139.0 05:15 05:45 280 psi, 30 rpm, 2.5 k trq. Rag top of cement @ 2,139' 10/1/2016 10/1/2016 4.00 INTRM1 PLUG DRLG T Drill cement f/2,139'to 2,340'w/450 2,139.0 2,340.0 05:45 09:45 gpm, 850 psi, 40 rpm, 3.7 k trq. 10/1/2016 10/1/2016 4.75 INTRM2 DRILL KOST T Drill kick off sidetrack & time drill 2,340.0 2,400.0 09:45 14:30 f/2,340' to 2,400'w/500 gpm, 920 psi, 40 rpm, 2 - 3 k trq, 20 ft/hr. P/U 125 k, SO 102 k, ROT 115 k. Seperation from old well bore confirmed. 10/1/2016 10/1/2016 1.00 INTRM2 DRILL CIRC T Circ B/U w/500 gpm, 920 psi, 20 rpm, 2,400.0 2,306.0 14:30 15:30 2.5 k trq. Rack back 1 stand (/2,400' to 2,306' 10/1/2016 10/1/2016 2.00 INTRM2 DRILL TRIP T F/C (static) POOF f/2,306' to 68' 2,306.0 68.0 15:30 17:30 10/1/2016 10/1/2016 1.00 INTRM2 DRILL BHAH T L/D BHA #6 as per SLB 68.0 0.0 17:30 18:30 10/1/2016 10/1/2016 0.50 INTRM2 DRILL BHAH T Clean & clear floor of BHA tools & 0.0 0.0 18:30 19:00 equip. 10/1/2016 10/1/2016 2.00 INTRM2 DRILL BHAH T M/U RSS BHA #7 to 821' 0.0 821.0 19:00 21:00 10/1/2016 10/1/2016 1.25 INTRM2 DRILL TRIP T RIH f/821' to 2,324' 821.0 2,324.0 21:00 22:15 10/1/2016 10/1/2016 0.25 INTRM2 DRILL DHEQ T Shallow hole test MWD tools 2,324.0 2,324.0 22:15 22:30 10/1/2016 10/1/2016 0.50 INTRM2 DRILL REAM T W&R (/2,324' to 2,400'w/600 gpm, 2,324.0 2,400.0 22:30 23:00 1570 psi, 60 rpm, 2 k trq 10/1/2016 10/2/2016 1.00 INTRM2 DRILL DDRL T Drill ahead f/2,400' to 2,481' MD'/ 2,400.0 2,481.0 23:00 00:00 2,160' TVD, ADT 1.04 hrs, ECD 10.20 ppg, 700 gpm, 2115 psi, PU wt 130 k, SO wt 115 k, ROT wt 125 k, 60 rpm, 3/6 k ft/lbs trq, 10/15 wob 10/2/2016 10/2/2016 0.25 INTRM2 DRILL DDRL T Drill ahead f/2,481' to 2,516' MD' 2,481.0 2,516.0 00:00 00:15 10/2/2016 10/2/2016 0.75 INTRM2 DRILL OTHR T Drop 1.25" ball to activate reamer. 2,516.0 2,516.0 00:15 01:00 Reamer shear @ 1400 psi, Open 11" hole f/2,357' Reamer closed 700 gpm, 2050 psi, 2968 TRPM Reamer opera 700 gpm, 1590 psi, 2343 TRPM 10/2/2016 10/2/2016 11.00 INTRM2 DRILL DDRL T Drill ahead f/2,516' to 4,120' MD'/ 2,516.0 4,120.0 01:00 12:00 3,078' TVD, ADT 7.25 hrs, ECD 11.13 ppg, 825 gpm, 2610 psi, PU wt 142 k, SO wt 111 k, ROT wt 124 k, 810 rpm, 5/10 k ft/lbs trq, 8/20 wob Page 29/73 Repor4 Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/2/2016 10/3/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/4,120'to 6,120' MD' / 4,120.0 6,120.0 12:00 00:00 3,902' TVD, ADT 8.09 hrs, ECD 11.68 ppg, 825 gpm, 3170 psi, PU wt 165 k, SO wt 115 k, ROT wt 129 k, 180 rpm, 4/11 k ft/lbs trq, 10/28 wob 10/3/2016 10/3/2016 7.75 INTRM2 DRILL DDRL T Drill ahead f/6,120' to 7,510' MD'/ 6,120.0 7,510.0 00:00 07:45 4,482' TVD,, ECD 11.3 ppg, 825 gpm, 2937 psi, PU wt 170 k, SO wt 133 k, ROT wt 137 k, 180 rpm, 4/14 k ft/lbs trq, 10/28 wob 10/3/2016 10/3/2016 1.00 INTRM2 DRILL CIRC T Dehydrated mud discovered in Drill 7,510.0 7,510.0 07:45 08:45 pipe with slight cement contamination racked back on pipe rack. Clean out drill pipe and confirm no large cement pieces present. Phenolpthalein test confirmed mostly mud. 10/3/2016 10/3/2016 3.25 INTRM2 DRILL DDRL T Drill ahead (/7,510' to 8,121' MD'/ 7,510.0 8,121.0 08:45 12:00 4,724' TVD, ADT 8.07 hrs, ECD 11.4 ppg, 840 gpm, 3000 psi, PU wt 175 k, SO wt 140 k, ROT wt 150 k, 180 rpm, 5/15 k ft/lbs trq, 10/28 wob 10/3/2016 10/3/2016 0.50 INTRM2 DRILL DDRL T Drill ahead f/8,121'to 8,199' (Drag 8,121.0 8,199.0 12:00 12:30 chain broke) 10/3/2016 10/3/2016 1.00 INTRM2 DRILL RGRP T Repair drag chain wear plate. Circ 8,199.0 8,199.0 12:30 13:30 w/400 gpm, 940 psi, 120 rpm, 9.1 k trq, reciprocate pipe. 10/3/2016 10/3/2016 0.50 INTRM2 DRILL SVRG T Service rig. Grease draw works, wash 8,199.0 8,199.0 13:30 14:00 pipe & top drive 10/3/2016 10/4/2016 10.00 INTRM2 DRILL DDRL T Drill ahead f/8,199" to 9,673' MD'/ 8,199.0 9,673.0 14:00 00:00 5,362' TVD, ADT 7.30 hrs, ECD 11.15 ppg, 840 gpm, 3170 psi, PU wt 202 k, SO wt 137 k, ROT wt 167 k, 180 rpm, 11.5/20 k ft/lbs trq, 26/31 wob 10/4/2016 10/4/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/9,673' to 11,500' MD'/ 9,673.0 11,500.0 00:00 12:00 6,114' TVD, ADT 8.55 hrs, ECD 10.91 ppg, 840 gpm, 3170 psi, PU wt 235 k, SO wt 145 k, ROT wt 180 k, 180 rpm, 14/24 k ft/lbs trq, 30 wob 10/4/2016 10/5/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/11,500'to 13,052' MD'/ 11,500.0 13,052.0 12:00 00:00 6,748' TVD, ADT 8.42 hrs, ECD 11.25 ppg, 840 gpm, 3600 psi, PU wt 261 k, SO wt 146 k, ROT wt 189 k, 180 rpm, 15/24 k ft/lbs trq, 30 wob 10/5/2016 10/5/2016 1.00 INTRM2 DRILL DDRL T Drill ahead f/13,052' to 13,238' MD'/ 13,052.0 13,238.0 00:00 01:00 6,826' TVD, ADT .99 hrs, 10/5/2016 10/5/2016 4.00 INTRM2 DRILL CIRC T Pump up final survey. Pump nut plug 13,238.0 13,238.0 01:00 05:00 sweep. Circulate hole clean for 2 B/U & wt up to 10.1 ppg. Wt up f/10.1 ppg to 10.3 ppg over next circulation w/840 - 810 gpm, 3620 - 3680 psi, 180 - 150 rpm, 22 - 20 k trq 10/5/2016 10/5/2016 0.25 INTRM2 DRILL OWFF T F/C (static) 13,238.0 13,238.0 05:00 05:15 10/5/2016 10/5/2016 0.25 INTRM2 DRILL MPDA T Pull trip nipple & install RCD bearing. 13,238.0 13,238.0 05:15 05:30 10/5/2016 10/5/2016 0.75 INTRM2 DRILL MPDA T Establish circ. Break in RCD bearing 13,238.0 13,238.0 05:30 06:15 as per MPD. Calibrate chokes. SPR's Page 30/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 10/5/2016 10/5/2016 5.75 INTRM2 DRILL DDRL T Drill ahead (/13,238' to 13,792' MD'/ 13,238.0 13,792.0 06:15 12:00 7,054' TVD, ADT 3.54 hrs, ECD 11.74 ppg, 800 gpm, 3740 psi, PU wt 280 k, SO wt 140 k, ROT wt 194 k, 180 rpm, 18/31 k ft/lbs trq, 22/30 wob 10/5/2016 10/6/2016 12.00 INTRM2 DRILL DDRL ' T Drill ahead f/13,792' to 14,731' MD / 13,792.0 14,731.0 12:00 00:00 7,421' TVD, ADT 8.61 hrs, ECD 11.41 ppg, 815 gpm, 3920 psi, PU wt 310 k, SO wt 140 k, ROT wt 202 k, 180 rpm, 17.5/31 k ft/lbs trq, 27/34 wob 10/6/2016 10/6/2016 12.00 INTRM2 DRILL DDRL T Drill ahead f/14,731' to 15,477' MD / 14,731.0 15,477.0 00:00 12:00 7,544' TVD, ADT 8.98 hrs, ECD 11.42 ppg, 805 gpm, 3890 psi, PU wt 325 k, SO wt 140 k, ROT wt 203 k, 160 rpm, 22/35 k ft/lbs trq, 22 wob 10/6/2016 10/6/2016 1.75 INTRM2 DRILL DDRL T Drill ahead f/15,477' to TD of 15,582' 15,477.0 15,582.0 12:00 13:45 MD / 7,566' TVD, ADT 1.33 hrs, ECD 11.45 ppg, 805 gpm, 3850 psi, PU wt 325 k, SO wt 140 k, ROT wt 200 k, 160 rpm, 22/33.5 k ft/lbs trq, 20/25 wob 10/6/2016 10/7/2016 10.25 INTRM2 CASING CIRC T SPR's. Pump up final surrey. Circ 8 15,582.0 15,582.0 13:45 00:00 B/U w/840 - 850 gpm, 3820 - 4060 psi, 150 - 180 rpm, 28 - 31 trq. (Perform 500 bbl dilution). After 6 th B/U pumped 30 bbl weighted nut plug sweep to aid in hole cleaning. 10/7/2016 10/7/2016 9.75 INTRM2 CASING CIRC T Circ 7+ B/U (16 total) w/850 - 840 15,582.0 15,582.0 00:00 09:45 gpm, 4050 - 3950 psi, 180 - 170 rpm, 26 - 22 trq. Wt up f/10.1 to 10.4 ppg. 10/7/2016 10/7/2016 1.25 INTRM2 CASING OTHR T Drop 1.625" ball to de -activate reamer. 15,582.0 15,582.0 09:45 11.00 Reamer open 700 gpm, 3370 psi, 2695 TRPM Reamer closed 700 gpm, 3410 psi, 3125 TRPM 10/7/2016 10/7/2016 4.25 INTRM2 CASING CIRC T Circulate & weight up f/10.4 ppg to 15,582.0 15,582.0 11:00 15:15 10.7 ppg w/750 - 660 gpm, 3670 - 3200 psi, 180 rpm 24 trq. (Observe decreasing pump pressure & TRPM) (Began seeing large clay cuttings on scalper deck, suspect wash-out stirred up cuttings) 10/7/2016 10/7/2016 0.25 INTRM2 CASING OTHR T Ramp down with MPD & check flow. 15,582.0 15,582.0 15:15 15:30 Fluid coming up thru drill string. Confirm washout in drill string. 10/7/2016 10/7/2016 3.00 INTRM2 CASING CIRC T Cont. to wt up to 11.0 ppg at reduced 15,582.0 15,582.0 15:30 18:30 flow rate of 300 gpm, 700 psi, 100 rpm 20 - 26 k trq. 10/7/2016 10/7/2016 0.50 INTRM2 CASING OWFF T F/C (static after 15 min) 15,582.0 15,582.0 18:30 19:00 10/7/2016 10/7/2016 0.50 INTRM2 CASING BKRM T Attempt to pump out of hole f/15,582' 15,582.0 15,488.0 19:00 19:30 to 15,488'w/2 bpm @ 200 psi. Tight hole and not able to work thru. BROPOH f/15,582' to 15,488'w/2 bpm @ 200 psi, 30 rpm 22 - 29 k trq. Page 31/73 ReportPrinted: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log staA Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X T Operation Pump OOH f/15,488' to 13,982'w/2 - (ftKB) 15,488.0 End Depth (ftKB) 13,982.0 10/7/2016 10/8/2016 4.50 INTRM2 CASING PMPO 3 bpm @ 200 - 300 psi. Work thru 19:30 00:00 various tight spots w/30 rpm & 20 - 28 k trq @ 14,743, 14675, 14,573' 10/8/2016 10!8/2016 1.50 INTRM2 CASING PMPO T Pump OOH f/13,982' to 13,238'w/2 13,982.0 13,238.0 00:00 01:30 3 bpm @ 160 - 240 psi. Observe washout in stand #132, 27.8' down from top of stand. (VVO positon was 2367' and to 2307' and while circulating and reciprocating on bottom) 10/8/2016 10/8/2016 0.25 INTRM2 CASING PULD T washed out single jt &replace 13,238.0 13,238.0 01:30 01:45 with single from pipe shed. with 10/8/2016 10/8/2016 4.50 INTRM2 CASING CIRC T Circulate &condition w/550 gpm, 2400 13,238.0 12,864.0 01:45 06:15 psi, 120 - 140 rpm, 20 k trq. Hole un- loaded clay. Pumped 30 bbl nut plug sweep to aid in hole cleaning. Rack back stands each hour f/13,238' to 12,864' 10/8/2016 10/8/2016 0.25 INTRM2 CASING OWFF T F/C (static after 10 min) =12,864.0 12,864.0 06:15 06:30 10/8/2016 10/8/2016 2.25 INTRM2 CASING SMPD T Line up MPD & Strip OOH f/12,864' to 12,864.0 11,033.0 11,033'. Worked thru various tight 06:30 08:45 spots. Not able to work past 11,033' 10/8/2016 10/8/2016 0.25 INTRM2 CASING TRIP T RIH 1 stand f/11,033'to 11,178' 11,033.0 11,178.0 08:45 09:00 10/8/2016 10/8/2016 1.75 INTRM2 CASING CIRC T Circulate hole clean f/11,178' to 11,178.0 10,989.0 09:00 10:45 10,989'. 10/8/2016 10/8/2016 1.75 INTRM2 CASING SMPD T Line up MPD & Strip OOH f/10,989' to 10,989.0 9,365.0 10:45 12:30 9,365'. Worked thru various tight spots. Not able to work past 9,365 10/8/2016 10/8/2016 2.00 INTRM2 CASING CIRC T Circulate hole clean f/9,365' to 9,297' 9,365.0 9,297.0 12:30 14:30 10/8/2016 10!8/2016 0.50 INTRM2 CASING SMPD T Line up MPD & attempt to Strip OOH. 9,297.0 9,297.0 14:30 15:00 No Success. 10/8/2016 10/8/2016 5.00 INTRM2 CASING BKRM T BROOH f/9,297' to 8,356'w/550 - 600 9,297.0 8,356.0 gpm, 2200 - 2400 psi, 140 rpm 12 - 18 15:00 20:00 k trq. Mainating ECD's <12.0 ppg. MPD ramp on connections 10/8/2016 10/8/2016 1.50 INTRM2 CASING CIRC T Circulate hole clean for 1.5 B/U 8,356.0 8,261.0 20:00 21:30 f/8,356' to 8,261' 10/8/2016 10/8/2016 0.25 INTRM2 CASING OWFF T FIC (static after 13 min) 8,261.0 8,261.0 21:30 21:45 10/8/2016 10/8/2016 0.25 INTRM2 CASING SMPD T Line up MPD &attempt to Strip OOH. 8,261.0 8,261.0 No Success. P/U wt 225 k, SO wt 125 21:45 22:00 k, Max overpull 50 k @ 275 k 10/8/2016 10/9/2016 2.00 INTRM2 CASING BKRM T BROOH (/8,261' to 7,794'w/600 660 8,261.0 7,794.0 gpm, 2380 - 2740psi, 140 rpm 13 - 21 22:00 00:00 k trq. Mainating ECD's <12.0 ppg. MPD ramp on connections 10/9/2016 10/9/2016 8.50 INTRM2 CASING BKRM T BROOH f/7,794' to 6,382' w/650 - 730 7,794.0 6,382.0 00:00 08:30 gpm, 2480 - 2890 psi, 140 - 180 rpm 8 10 k trq. Mainating ECD's <12.0 ppg. MPD ramp on connections. Various tight spots (7,694, 7,256, 6,864, 6,770, 6,717) 10/9/2016 10/9/2016 0.75 INTRM2 CASING CIRC T Circ 1.3 B/U w/730 gpm, 2800 psi, 180 6,382.0 6,382.0 08:30 09:15 rpm, 10 - 9 k trq 10/9/2016 10/9/2016 0.50 INTRM2 CASING OWFF T F/C (static) PJSM - Pull RCD bearing 6,382.0 6,382.0 09:15 09:45 Page 32/73 Report Printed: 12/1/2016 Operations Summary (with Timelog Depths) CD5-99 Page Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Depth Operation (ftKB) End Depth (ftKB) End Time Dur(hr) Phase Op Code Activity Code Time P -T -X T Pull RCD bearing &install trip nipple 6,382.0 6,382.0 Start Time 10/9/2016 10/9/2016 0.50 INTRM2 CASING MPDA 6,382.0 2,326.0 09:45 10:15 T BROOH f) 6,382' to 2,326 w/730 gpm, 10/9/2016 10/9/2016 12.25 INTRM2 CASING BKRM 2550 - 2890 psi, 180 - 140 rpm 10 - 4 10:15 22:30 k trq. Mainating ECUS <12.0 ppg. Pulled slow w/ 30 rpm across shoe & pumped nut plug sweeps to aid in cleaning . 2,326.0 2,326.0 10/9/2016 0.75 INTRM2 CASING CIRC T Pump nut plug sweep & circ casing clean w/730 gpm, 2600 psi, 80 rpm, 10/9/2016 22:30 23:15 2600 psi. Hole un -loaded huge amounts of clay. Large clay balls the size of hockey pucks & soft balls T F/C (static) - SIMOPS C/O mud pump 2,326.0 2,326.0 10/9/2016 10/9/2016 0.25 INTRM2 CASING OWFF #1 & #2 suction screens. 2,.138.0 23:15 23:302,326.0 T BROOH f/ 2,326' to 2,138 w/730 gpm, 10/9/2016 10/10/2016 0.50 INTRM2 CASING BKRM 2500 psi, 80 rpm 3 - 4 k trq. Pumped 23:30 00:00 nut plug sweep to aid in hole cleaning. T BROOH f/2,138 M. gp m, 2400 psi, 2,138.0 1,478.0 10/10/2016 10/10/2016 3.00 INTRM2 CASING BKRM 120 rpm 3 k trq. Pumped nut plug 00:00 03:00 sweep to aid in hole cleaning. Hole un -loading large amounts of clay patties. 1,478.0 1,478.0 10/10/2016 10/10/2016 0.25 INTRM2 CASING OWFF T F1C (static) 178 0 03:00 03:15 PMPO T Attempt to POOH on elevators. 1,478.0 10/10/2016 10/10/2016 3.25 INT CASING (Swabbing). Pump OOH f/1,478'to 03:15 06:30 179' 179.0 179.0 10/10/2016 10/10/2016 0.25 INTRM2 CASING OWFF T FIC (static) 0.0 06:30 06:45 BHAH T UD BHA #7 as per SLB 179.0 10/10/2016 10/10/2016 1.75 INTRM2 CASING 0.0 0.0 06:45 08:30 0.25 INTRM2 CASING BHAH T Clean &clear floor 10/10/2016 08:30 10/10/2016 08:45 R/U Brack washer &wash stack w/10 0.0 0.0 10/10/2016 10/10/2016 0.25 INTRM2 CASING WWWH T bpm @ 130 psi. 0.0 08:45 09:00 BOPE P PJSM, Drain stack. Pull wear ring. 0.0 10/10/2016 10/10/2016 1.50 INTRM2 CASING C/O upper rams from 3'/=' x 6" VBR to 09:00 10:30 7-5/8" solid body. 0.0 0.0 R/U to test BOPE. Fill lines with H2O 10/10!2016 10/10/2016 1.00 INTRM2 WHDBOP RURD P 0.0 10:30 11:30 P ROPE Test: Test with 5" & 7 518" test 0.0 10/10/2016 10/10/2016 5.00 INTRM2 WH BOP BOPE joint, Test Annular to 250/2,500 psi for 11:30 16:30 5 min, Test choke valves #1 - 14 and needle valve to 250/3,500 psi for 5 min. HCR Choke and Kill, 4" Demco, 5" FOSV, dart & needle valves, auto & IBOP, HCRchoke & kill, 7 5/8" manual casing rams, 3 1/2" X 6" lower VBR's, & blind rams to 250/3500 psi for 5 min. Koomey test; IP= 3,000 psi, press after close = 1,600 psi, 200 psi recovery 26 sec, full recovery 129 sec, N2- 4 bottle average= 2075 psi. Tested gas alarms. Draw down on man & super choke to 1,100 psi. - Test waived by Jeff Jones of the AOGCC. I R/D testing equipment. B/D choke & 0.0 0 10/10/2016 10/10/2016 0.75 INTRM2 WHDBOP RURD kill lines. Set 10.25" ID wear ring. 16:30 17:15 Report Printed: 1211/20 Page Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Time P -T -X p R/U to run casing. R/U Volant, bale extensions, 7 5/8" elevators & spiders. P PJSM. Make up shoe track & RIH w/7 5/8", 29.7 #, L-80, BTC -M casing as per tally to 1,325' (31 joints in the hole) Check floats on jt #5 (good) P Continue picking up and running 7- 5/8" 29.7# L-80 BTCM casing per running order from 1,325' MD to 6,699' MD. P/U=180k, S/0=140k. p Establish circulation and stage pumps up from 1 bpm 228 psi, to 8 bpm 320 psi. CBU, heaviest mud 11.2 ppg out, 11.0 ppg in. p Continue picking up and running 7- 5/8" 29.7# L-80 BTCM casing per running order from 6,699' MD to 10,975' MD, joint #273. P/U=255k, S/0=1 55k. p Establish circulation to CBU @ 10,975' MD, above the Albian 96. Stage up from 1 bpm to 5 bpm 480 psi, pumped '/Z bottoms up @ 00:00 hrs. Heaviest mud out 11.5 ppg, 11.0 ppg in. P Continue to CBU @ 10,975' MD, above the Albian 96. Stage up from 5 to 7 bpm 520-480 psi. Heaviest mud out 11.5 ppg, 11.0 ppg in. p Continue picking up and running 7- 5/8" 29.7# L-80 BTCM, XO to H563 casing per running order from 10,975' MD to 13,808' MD, joint #343. P/U=315k, S/0=160k. ( Had 50k bobble @ 13,668' MD, sticky out of slips after connection) P Circulate and condition @ 13,808' MC above the HRZ. Stage up from .5 to 5.5 bpm 510-640 psi. P/1 -1=315k, S/O=160k, 420k to break over. Continue to circulate ai lu �—, 13,808' MD, above the HRZ. Stage up from 5.5 to 8 bpm 460 psi. Heaviest mud out 11.7+ ppg briefly then dropped off to 11.0+. P/U=315k, S/0=1 60k with pumps on. Continue picking up and running 7- 5/8" 29.7# L-80 H563 casing per running order from 13,808' MD to 15,392' MD. S/0=105k. Started taking weight at 14,465' MD, to block weight (60k) at times. Continued RIH slowly, improved at -15,100' MD to S/0 of -105k. End Depth (ttKa) D.0 0.0 0.0 1,325.0 6,699.0 Time Log Start Time End Time Dur Phase CASINGde RURDActivi�Code 10,975. 10/10/2016 10/10/2016 13,808. 1h50 INTRM2r) 17:15 18:45 10/10/2016 10/11/2016 5.25 INTRM2 CASING PUTB 18:45 00:00 10/11/2016 10/11/2016 10.00 INTRM2 CASING PUTB 00:00 10:00 10/11/2016 10/11/2016 1.75 INTRM2 CASING CIRC 10:00 11:45 10/11/2016 10/11/2016 10.50 INTRM2 22:15 =CASINGPUTB11:45 10/11/2016 10/12/2016 1.75 INTRM2 CASING CIR 22:15 00:00 10/12/2016 10/12/2016 1.25 INTRM2 CASING CIRC 00:00 01:15 10/12/2016 10/12/2016 9.00 INTRM2 CASING PUTB 01:15 10:15 10/12/2016 10/12/2016 1.75 INTRM2 CASING CIRC 10:15 12:00 10/12/2016 10/12/2016 2.75 INTRM2 CASING CIRC 12:00 14:45 10/12/2016 10/1312016 9.25 INTRM2 CASING PUTB 14:45 00:00 Paae Job: DRILLING ORIGINAL Time P -T -X p R/U to run casing. R/U Volant, bale extensions, 7 5/8" elevators & spiders. P PJSM. Make up shoe track & RIH w/7 5/8", 29.7 #, L-80, BTC -M casing as per tally to 1,325' (31 joints in the hole) Check floats on jt #5 (good) P Continue picking up and running 7- 5/8" 29.7# L-80 BTCM casing per running order from 1,325' MD to 6,699' MD. P/U=180k, S/0=140k. p Establish circulation and stage pumps up from 1 bpm 228 psi, to 8 bpm 320 psi. CBU, heaviest mud 11.2 ppg out, 11.0 ppg in. p Continue picking up and running 7- 5/8" 29.7# L-80 BTCM casing per running order from 6,699' MD to 10,975' MD, joint #273. P/U=255k, S/0=1 55k. p Establish circulation to CBU @ 10,975' MD, above the Albian 96. Stage up from 1 bpm to 5 bpm 480 psi, pumped '/Z bottoms up @ 00:00 hrs. Heaviest mud out 11.5 ppg, 11.0 ppg in. P Continue to CBU @ 10,975' MD, above the Albian 96. Stage up from 5 to 7 bpm 520-480 psi. Heaviest mud out 11.5 ppg, 11.0 ppg in. p Continue picking up and running 7- 5/8" 29.7# L-80 BTCM, XO to H563 casing per running order from 10,975' MD to 13,808' MD, joint #343. P/U=315k, S/0=160k. ( Had 50k bobble @ 13,668' MD, sticky out of slips after connection) P Circulate and condition @ 13,808' MC above the HRZ. Stage up from .5 to 5.5 bpm 510-640 psi. P/1 -1=315k, S/O=160k, 420k to break over. Continue to circulate ai lu �—, 13,808' MD, above the HRZ. Stage up from 5.5 to 8 bpm 460 psi. Heaviest mud out 11.7+ ppg briefly then dropped off to 11.0+. P/U=315k, S/0=1 60k with pumps on. Continue picking up and running 7- 5/8" 29.7# L-80 H563 casing per running order from 13,808' MD to 15,392' MD. S/0=105k. Started taking weight at 14,465' MD, to block weight (60k) at times. Continued RIH slowly, improved at -15,100' MD to S/0 of -105k. End Depth (ttKa) D.0 0.0 0.0 1,325.0 6,699.0 6,699.0 6,699.0 10,975.0 10,975.0 10,975.( 10,975.0 10,975. n 975.0 13,808. 13,808.0 1s, 13,808.0 13, 13,808.0 15 34/73 Report Printed: 12/1/201 Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase 10/13/2016 10/13/2016 1.25 I NT RM2 00:00 01:15 10/13/2016 10/13/2016 01:15 01:45 10/13/2016 10/131 10/13/2016 10/13/2016 01:45 02:15 10/13/2016 10/13/201E 02:15 07:15 17:15 10/13/2016 10/13/201( 07:15 07:30 10/13/2016 10/13/201 F 07:30 09:00 10/13/2016 10/ 13/2011 09:00 12:00 10/13/2016 110/13/201 12:00 13:15 10/13/2016 I "I U/'16, 13:15 15:00 10/13/2016 1 U/16 15:00 15:45 10/13/2016 10/131 15:45 16:15 10/13/2016 10/13 16:15 17:15 10/13/20�61 Disp=177.56 bbl, Actual Disp=124 bbl. 17:15 1.7 0. I Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Code Activity Code Operation Time P -T -X p 815,392', Start Depth (ftKB) End Depth (ftKB) 15,392.0 15,570.0 !G PUTB P 29.7# L-80 casing from M/U hanger and landing joint, land on hanger @ 15,570.58' MD. Calc Disp=177.56 bbl, Actual Disp=124 bbl. S/O=130k, P/U= N/A. SIMOPS verify pipe count and empty pipe shed. CIRC ulation @ .5 bpm, 510 Establshcrc=NT 15,570.0 15,570.0 psi. SIMOPS- Load pipe shed with 4" DP. =NT HOSO P Shut down pumps, drain stack to 15,570.0 15,570.0 verify hanger is landed, good per FMC. .NT CIRC P Circulate and condition mud for 15,570.0 15,570.12 cement, .5 bpm to 8 bpm, 480-535 psi. Attempt to reciprocate pipe, P/U from 450k -490k max, no go. ENT RURD P Shut down pumps, blow down top 15,570.0 15,570.( drive. R/U cement lines. ENT CIRC P Continue circulate and condition @ 8 15,570.0 15,570.( bpm, 830 psi. SIMOPS- PJSM on cement job. ENT CMNT P Flood lines with water, test lines to 15,570.0 15,5701 3800 psi. SLB pumped 41 bbl of 12.5 ppg Mud Push II. Drop bottom plug. SLB pumped 154.5 bbl of 15.8 ppg cement. Drop top plug. SLB kick out with 20 bbl water, rig displaced with 6892 strokes to bump plug (694 bbl). CIF, @ 11:50 hrs, no losses. SENT CIRC P Open stage collar with 3150 psi, 15,570.0 15,570. establish circulation to 8 bpm, 520-530 psi. SIMOPS- PJSM on 2nd stage cement. RENT CMNT P Peform 2nd stage cement job. Flood 15,570.0 15,570 cement lines, pressure test to 3000 psi. SLB pumped 42 bbl 12.5 ppg MudPush 11, 65 bbl 15.8 ppg cement. Drop closing plug. SLB kick out with 20.2 bbl water, rig displaced with 2867 stks (288 bbl). Bumped plug and pressure up to 1900 psi, held 5 minutes. Bleed pressure and check floats - good. CIP @ 14:34 hrs. MENT RURD P Blow down cement line, rig down and 15,570.0 lay down Volant CRT, lay down landing joint. MENT RURD P Pick up test joint and M/U retrieval 0.0 tool. Pull wear ring. WWSP P Set and test 7-5/8" packoff to 5000 psi 0.0 1 .MENT for 10 minutes witnessed by CPAI rep, good. -WENT RURD P Lay down test joint, install 5" 0.0 elevators. Grease iron roughneck and draw works. Rig: DOYON 19 Time Log Start TimeEnd Time Dur (hr) Phase 10/13/2016 10/14/2016 6.50 INTRM2 17:30 00:00 10. 00:00 110:00 10/14/2016 1 u1 14 10:00 11:45 10/14/2016 1 "1 u/ 14i/ -u i o 11:45#10/14/2016 1 10/14/212:0010/14/212:30 16:00 10/14/2016 10/14/2016 1 16:00 17:45 13:15 114:15 TO—/14/720-1-6--F1 0/14/2016 1 14:15 16:00 10/14/2016 10/14/2016 1 16:00 17:45 0.0 10/14/2016 10/14/2016 replacing overhead mud lines. SIMOPS- Perform annular LOT on 17:45 18:15 10/ 14/2016 10/ 14/2016 18:15 19:30 10/14/2016 10/14/2016 P Chan e out saver sub from DS50 to 9 XT39. SIMOPS- change out handling 19:30 20:00 10/ 14/2016 10/ 15/2016 20:00 00:00 00:00 01:15 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth rfrKR1 End Depth (ftKB) Op Code CEMENT PULD Activity Code Time P -T -X Operaiiun P Lay down 5" DP from derrick via mouse hole. SIMOPS - Replace mud lines in pits, C/O upper rams from 7-5/8" to 3'/=' x - C 0.0 6" VBR. CEMENT PULD Lay down 5" drill pipe via mousehole P (94 stands DP and 7 stands HWDP) SIMOPS- Welding in pit room, 0.0 replacing overhead mud lines. SIMOPS- Perform annular LOT on CD5-99A, 15.1 pg EMW. Flush outer annulus with 300 bbl water and freeze protect with 85 bbl diesel. CEMENT RURD P Chan e out saver sub from DS50 to 9 XT39. SIMOPS- change out handling 0.0 equipment to 4". OA pressure @ 11:45 hrs= 50 psi CEMENT BOPE Set test plugwith 4" test joint. P SIMOPS - Take 7-5/8" rams out of 0.0 cellar. CEMENT BOPE P Fill lines, rig up to test rams and annular with 4" test joint, 4" valves. 0.0 CEMENT BOPE P With 4" test joint, tested annular, HCR kill and choke to 250/2500 psi 5 min ea. Test upper pipe rams, NCR kill 0.0 and choke, 4" Dart valve, lower pipe rams and TIW valve to 250/3500 psi, 5 min each. CEMENT TOPE 17-- Drain stack, rig down test equipment. Set 7.1875" ID wear ring per FMC rep. SIMOPS- Bring up MPD bearings and 0.0 BHA tools. 2 CEMENT BHAH PJSM and M/U BHA #8 (6'/4" P Production Periscope/ Powerdrive) per 0.0 DD/MWD reps to 339' MD. 2 CEMENT PULD P Single in hole from pipe shed on 4" DP from 339' MD to 1,759' MD. 339.0 2 CEMENT DHEQ P Fill pipe and shallow test MWD @ 220 gpm, 1200 psi - good. SIMOPS- PJSM on cut / slip drilling 1,759.0 1, 12 CEMENT SLPC line. Slipand cut 97.5' drilling line. Re- P cabrate block height Totco and SLB. 1,759.0 1, 12 CEMENT 42 CEMENT SVRG PULD P Service top drive, draw works and iron roughneck. P Single in hole from pipe shed on 4" DP from 1759' MD to 5,548' MD, fill pipe every 20 stands. P/1 -1=120k, S/O=100k 1,759.0 1, 1,759.0 5, @ 5,548' MD. OA pressure @ 22:00 hrs= 60 psi. JI2 CEMENT PULD P Continue singling in hole, 4" DP BHA # 8 from 5,548' MD to 6,495' MD 5,548.0 6 filling pipe every 20 stands. Page annnrt Printed: 1 0 Ci .01 Operations Summary (with Timelog Depths) a Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Establish circulation, wash down from Start Depth (ftKB) End Depth (ftKB) 6,495.0 6,711.0 10/15/2016 10/15/2016 2.00 INTRM2 CEMENT DRLG P 6,495' MD @ 220-230 gpm, 1650- 01:15 03:15 1730 psi, 40-60 rpm, 3-4.5k Tq. Tag stage collar closing plug on depth @ 6,707' MD. Drill plug and stage collar with 5-8k WOB, 120 gpm, 650 psi, 30 rpm, 7.5k Tq. Drill out of stage collar @ 6,711' MD. P/U=130k, S/O=100k, ROT= 115k. INTRM2 CEMENT REAM P Precabelowutionary as and eadown Ilar 6,711.0 7,063.0 10/15/2016 10/15/2016 1.25 stage c from 6f 719 MD to 03:15 04:30 7,063' MD, 220 gpm, 1660 psi, 80 rpm, 5.5k TQ. CEMENT PULD P Continue si gling in hole, 4" DIP BHA 7,063.0 8,956.0 10/15/2016 10/15/2016 2.25 1 # 8 from 7,063' MD to 8, 56' MD 04:30 06:45 filling pipe every 20 stands. PIU=165k, S/0=100k. INTRM2 CEMENT QEVL P tcscope from 9,048.0 10/15/2016 10/15/2016 1.25 9,048' MDOforph g 9561 MD toth free ring 06:45 08:00 signature with no cement behind pipe. INTRM2 CEMENT PULD P 112 9,048.0 12,179.0 10/15/2016 10/15/2016 3.50 # 8 from 9,048' MD to 179' MDA 08:00 11:30 filling pipe every 20 stands. P/U=190k, S/0=100k. OA pressure @ 10:45 hrs= 530 psi 0.50 INTRM2 CEMENT QEVL P Sonicscope, 230 12,179.0 12,179.0 10/15/2016 10/15/2016 gDporwn2250 psctivate i. 11:30 12:00 CEMENT QEVL P Cement bond log with Sonicscope @ 12,179.0 13,968.0 10/15/2016 10/15/2016 3.75 INTRM2 900 fph from 12,179' MD to 13,968' 12:00 15:45 MD recorded mode. CEMENT QEVL P Real time log with Impulse Gamma @ 13,968.0 14,121.0 10/15/2016 10/1 5/2016 1.25 INTRM2 250 fph to depth correlate formation 15:45 17:00 HRZ from 13,968' MD to 14,121' MD. 230 gpm, 2260 psi. Log picked up marker 9' deep from drilling log. (No rotation) Continue recording Sonicscope CBL data. INTRM2 CEMENT QEVL P Cement bond log with Sonicscope @ 14,121.0 14,352.0 10/15/2016 10/15/2016 0.75 900 fph from 14121' MD to 14,352' 17:00 17:45 MD recorded mode. P Real time log with Impulse Gamma @ 14,352.0 14,446.0 10/15/2016 10/15/2016 1.00 INTRM2TCEMENTQEVL 250 fph to depth correlate formation 17:45 18:45 Kuparuk C from 14,352' MD to 14,446' MD. 230 gpm, 2370 psi. Log picked up marker 13' deep with no rotation. P/U and repeat log with 60 rpm and picked up marker 9' deep from drilling log. Continue recording Sonicscope CBL data. CEMENT QEVL P Cement bond log with Sonicscope @ 14,446.0 14,827.0 10/15/2016 10/15/2016 0.75 INTRM2 900 fph from 14,446' MD to 14,827' 18:45 19:30 MD recorded mode. Report Printed: 12/1/201 Paae 37/73 40 Kig: DOYON _ rime Log Start Time End Time Dur (hr) Phase 10/15/2016 10/15/2016 1.75 IN TRM2 19:30 21:15 1 21:15 122:30 22:30 123:00 10/15/2016 10/15/2016 23:00 23:15 10/ 15/2016 10/15/2016 23:15 23:45 10/15/2016 10/16/201 E 23:4500:00 cement @ 15,389' MD. 10/16/2016 16/16/201E 00:00 00:15 10/16/2016 10/16/201( 00:15 00:45 10/ 16/2016 10/16/2011 00:45 01:30 10/161201b iU1I0 01:30 03:30 10/16/2016 10/16/2016 03:30 03:45 10/16/2016 10/16/201 E 03:45 06:15 06:15 06:45 CII A Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth Operation (1KB) End Depth (ftKBJ Code Activity Code Time P -T -X 14,827.0 14,957.0 NT DLOG P Real time log with Impulse Gamma @ 250 fph to locate RA tag from 14,827' MD to 14,957' MD. 230 gpm, 2370 psi. Gap in MWD data missed tag on first run. PIU and repeat log, Periscope picked up tag (427 gAPI) @ 14,936' bit depth, Impulse picked up tag (362 gAPI) at 14,957.88' bit depth. Tool offsets places RA tag @ 14,896.85' drill pipe measurement. Casing tally places RA tag at 14,898.56'. 1.71' difference with no rotation. Continue recording Sonicscope CBL data. Page 38113 Reoort 1 ,304.0 15,396.0 fid 15,582.1 Wash down from 14,95T MD to 14,957.0 10,, 15,389' MD, 230 gpm, 2390 psi. Tag cement @ 15,389' MD. OA pressure @ 22:00 hrs= 560 psi Drill cement from 15,389 MD to 15,389.0 15, 15,395' MD', 230 gpm 2390 psi, 60 rpm 17.4k Tq. P/U=250k, S/0=1 00k, R0T=155k. Backream stand out of hole from 15,395.0 15 15,395' MD to 15,304' MD, rack back in derrick. p Blow down top drive, rig up equipment 15,304.0 15 P for casing test. Begin pressure test casing to 3500 psi 15,304.0 15 P for 30 minutes. Complete casing test to 3500 psi for 15,304.0 1 F 30 minutes charted. P Bleed off pressure and rig down 15,304.0 15 testing equipment. P Wash and ream down from 15,304' 15,304.0 MD to 15,396' MD 230 gpm, 2600 psi, 60 rpm, 17.5k Tq. SIMOPS- PJSM on displacing to MOBM. P Displace well from 11.0 ppg LSND to 15,396.0 9.5 ppg MOBM. Pumped 40 bbl Safe Surf spacer with both pumps, followed by 75 bbl HV MOBM from pit 5, dropped riser and completed displacement, 640 bbl MOBM from active system. Displaced at 230 gpm until 9.5 ppg out bit, then increase to 265 gpm, 3130 psi, 60-80 rpm, 17.5k initial torque, 8.5k final torque. (No Lube 776 in MOBM) P Clean shakers, shaker trays and 15,396.0 troughs of residual WBM. GIS prepare for recieving OBM cuttings. P Drill out bafFle collar, float collar, shoe 15,396.0 track, shoe and rathole from 15,396' MD to 15,582' MD. 230-250 gpm, 2440 2870 psi, 40-60 rpm, 11-11.5k Tq, 5-15k WOB. P Drill 20' new formation to 15,602' MD, 15,582 250 gpm, 2980 psi, 60 rpm, 10k Tq, 15k WOB. Dri n4oll• ' Page 38113 Reoort 1 ,304.0 15,396.0 fid 15,582.1 Rig: DOYON 19 Time Log 10:00 10:30 10/16/2016 Start Time End Time our (hr) Phase 10/16/2016 10/16/2016 2.00 INTRM2 and perform FIT to 12.5 ppg 1190 psi applied with 9.5 ppg @ 7,569' ND. Rig down test 06:45 08:45 - 10/16/2016 10/16/2016 0.50 INTRM2 08:45 09:15 100 rpm 2 min ea. OA pressure @ 10:30 hrs= 510 psi. L 10/16/2016 0.75 INTRM2 10/16/2016 09:15 i 10:00 DDRL P Directional drill 63/4' production hole from 15,639' MD to 16,684' MD, 270 gpm 3610 psi, 150 rpm, 12.5k Tq, 5- 10k WOB. ADT= 8.61. ECD=11.0 ppg 10/16/2016 1011 bi 10:00 10:30 10/16/2016 10/16, 10:30 11:30 10/16/201b I1un0, 11:30 12:00 001 PROD1 10/16/2016 10/17/2016 12.00 I PROD1 12:00 00:00 10/17/2016 1 1 u/.t t 00:00 11:15 FM 1:15 16:00 10/17/2016 0/17/2016 I 1 16:00 17:15 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINA Start Depth (ftKB) End Depth ft Code NT CIRC Activity Code Time P -T -X P Circulate gpm, uperanon and condition for FIT, 250 1 2980 psi, 60 rpm, 10k Tq. NT PMPO P Pump gpm, out to 15,559' MD for FIT, 170 1 1600 psi. P/U=225k, SI0=125k. 15.639.0 Flow check static. :NT FIT P R/U EMW. OBM and perform FIT to 12.5 ppg 1190 psi applied with 9.5 ppg @ 7,569' ND. Rig down test equipment. - MPDA P bearing. Pull trip nipple and install MPD REAM P Wash and ream down from 15,559' MD to 15,602' MD 270 gpm, 3290 psi. Break in MPD bearing @ 50 rpm and 100 rpm 2 min ea. OA pressure @ 10:30 hrs= 510 psi. L DDRL P Directional 15 602'rill 3MDt 115,639' MDroduction h1 270 gpm 3410 psi, 60 rpm, 13.5k Tq, 15k WOB. ADT=.56 L DDRL P Directional drill 63/4' production hole from 15,639' MD to 16,684' MD, 270 gpm 3610 psi, 150 rpm, 12.5k Tq, 5- 10k WOB. ADT= 8.61. ECD=11.0 ppg @ 230 fph, reduce ROP to 100 then 50 to achieve turn, ECD reduced to 10.77 ppg EMW. Entered Alpine A target @ 16,053' MD. Pump anti -jamming sweep at 16,462' MD, HV OBM with 8 ppb G -Seal, followed by 20 bbl LV OBM. OA pressure @ 22:00 hrs=540 psi. LL DDRL P Directional drill Alpine A lateral from 16,684' MD to 17,873' MD, 7,604' TVD, ADT=8.31 hrs, Jar Hrs=34.91. 275 gpm, 3800 psi, ECD=10.9-1 1 .0 ppg EMW, 160 rpm 14.5k Tq, 10-15k WOB. P/U=245k, S/0=105k, ROT=160k. Pumped anti -jamming sweep @ 17,070' MD. OA pressure @ 12:00 hrs=550 psi ILL DHE O T Circulating 280-290 gpm, 3640-4100 psi. Troubleshoot SLB tools due inability to successfully send downlink. Checked pulsation dampeners, attempted both pumps individually and together, SLB attempted different downlink rates, check for air/gas in mud -none. Changed from 18 sec downlink to 32 sec downlink. Attempt downlink holding 125 psi back pressure on annulus to compensate for compressibility of OBM and got successful downlink. 21LL DDRL P Directional drill Alpine A lateral from 17,873' MD to 17,968' MD, 275 gpm, 3800 psi, ECD=10.78 ppg EMW, 160 rpm 14.5k Tq, 10-15k WOB. PIU=245k, S/0=105k, ROT=160k. Pumped HV/LV anti jamming sweep with no graphite @ 17,915' MD. Page 5,559.0 15,559.0 15,559.0 15,602.0 15,602.0 15,639.( 15.639.0 16,684.1 i 0 nted: DOYON 19 Operations Summary (with Timelog Depths) CD5-99 Start-rimeEnd Time our (hr) Phase 1.00 PROD1 op Code DRILL 10/17/2016 10/17/2016 downlink. 17:15 18:15 17,968' MD to 18,541' MD, 7,615' 10/17/2016 10/18/2016 5.75 PROD1 DRILL 18:15 00:00 10-15k WOB. P/U=240k, S/0=95k, 10/18/2016 10/18/2016 12.00 PROD1 DRILL 00:00 12:00 9.5/9.4 ppg. OA pressure @ 22:00 hrs=550 psi 10/18/2016 10/19/2016 12.00 PR D1 DRILL 12:00 00:00 TVD, ADT=7.74 hrs, Jar Hrs=47.08. 10/19/2016 10/19/2016 9.75 PROD1 DRILL 00:00 09:45 10-15k WOB. P/U=250k, S/O=N/A, Job: DRILLING ORIGI Start Depth /HICRI End Dep'. Activity Code 'Time P -T -X `•,�,. m, 3800 T Continue circulating280 gp DHEQ psi, sending downlink commands to Powerdrive and confirming successful downlink. DDRL P Directional drill Alpine A lateral from 17,968' MD to 18,541' MD, 7,615' TVD, ADT=4.43 hrs, Jar Hrs=39.34. 275 gpm, 3920 psi, ECD=11.18 ppg EMW, 160 rpm Tq on/off=1 5.5k/1 3.8k, 10-15k WOB. P/U=240k, S/0=95k, ROT=162k. Ran vacuum de -gasser in attempt to remove .1 ppg difference in pressure balance/mud balance. No change, 9.5/9.4 ppg. OA pressure @ 22:00 hrs=550 psi Daily seepage losses= 50 bbl. DDRL P Directional drill Alpine A lateral from 18,541' MD to 19,971' MD, 7,631' TVD, ADT=7.74 hrs, Jar Hrs=47.08. 277 gpm, 4075 psi, ECD=11.04 ppg EMW, 150 rpm Tq on/off=17k/15.5k, 10-15k WOB. P/U=250k, S/O=N/A, ROT=160k. Lost SOW @ 18,800' MD (pumps on). Begin dynamic connections, using pump #1 to hold 210 psi on annulus during connections @ 19,300' MD. OA pressure @ 11:20 hrs=530 psi Pump HV/LV anti -jam sweeps 2 per tour without graphite. Tour seepage losses= 82 bbl. DDRL P Directional drill Alpine A lateral from 19,971' MD to 21,210' MD, 7,640' TVD, ADT=6.44 hrs, Jar Hrs=53.52. 270 gpm, 4200 psi, ECD=11.48 ppg EMW, 150 rpm Tq on/off=19.5k/14.2k, 10-15k WOB. P/U=250k, S/O=N/A, ROT=160k. Performing dynamic connections with pump #1 holding 210 psi on annulus during connections. OA pressure @ 22:00 hrs=520 psi Tour seepage losses= 66 bbi. DDRL P Directional drill Alpine A lateral from 21,210' MD to 22,276' MD. 270 gp 4200 psi, ECD=11.42 ppg 80 rpm Tq on/off=20k/l7.2k, 10-15k WOB. P/U=255k, S/O=N/A, ROT=161 k. Continue dynamic connections with pump #1 holding 21 C psi on annulus. Change MWD transmit frequency due difficulty obtaining surveys from -21,500' MD. Reduce to 1.5hz, 1 bps to stay in sync. 1779 -6 -8 -.OT -18,541.0 18,541.0 19,971.0 19.971.0 1 21 ,21 211 Rlig: DOYON 19 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth (ftKB) End Depth (ftKB) Phase Op Code Activity Code Time P-T-XrTroubleshoot uperanun Start Time End Time 0—n ,t Printed: 121112011 Page 41 Our (hr) CIRC T 22,276' MD, 270 �&N.0 22,276.010/19/2016 10/19/2016 0.50 PROD1 DRILL 0 rpm, 14k TQ. 09:45 10:15 ot MWD tools.Changng requency for real time log kened signalpresumed due oM compressibility, as well as limited stand pipe pressure. DDRL P Drill from 22,276' MD to 22,292' MD, 22,276.0 22,292.0 10/19/2016 10/19/2016 0.25 PROM DRILL 270 gpm, 4170 psi, 180 rpm, 18k Tq. 10:15 10:30 CIRC T Circulate @ 22,292' MD, 270 gpm 22,292.0 22,292.0 10/19/2016 10/19/2016 0.50 PROD1 DRILL 4050 psi, 100 rpm, 15k TQ, continue 10:30 11:00 troubleshoot MWD tools. Changing data rate / frequency for real time log quality. Downlink to reset to 1 bps rate. Note- SPR's taken with 200 psi back pressure. OA pressure @ 11:00 hrs=550 psi P Directional drill Alpine A lateral from 22,292.0 22,351.0 DRILL DDRL 10/19/2016 10/19/2016 1.00 PROD' 22,292' MD to 22,351' MD, 7,650' 11:00 12:00 TVD, ADT=7.17. 270 gpm, 4200 psi, ECD=11.42 ppg EMW, 180 rpm Tq on/off=20k/17.2k, 10-15k WOB. P/U=255k, S/O=N/A, ROT=161 k. Continue dynamic connections with pump #1 holding 210 psi on annulus. Fault #1 @ 22,242' MD (13' DTS), fault #2 @ 22,325' MD (17' DTS), no losses. Tour seepage losses= 19 bbl. P Directional drill Alpine A lateral from 22,351.0 23,544.( DRILL DDRL 10/19/2016 10/2012016 12.00 PROD' 22,351' MD to 23,544' MD, 7,685- 12:00 00:00 TVD, ADT=7.21. 270 gpm, 4270 psi, ECD=11.82 ppg EMW, 180 rpm Tq onloff=21.1k/17.1k, 10-15k WOB. P/U=250k, S/O=N/A, ROT=155k. Continue dynamic connections with pump #1 holding 210 psi on annulus. Note- SPR's taken with 200 psi back pressure. Back in Alpine A @ 22,715' MD, 473' out of zone. OA pressure @ 22:00 hrs=540 psi Tour seepage losses= 73 bbl, 92 bbl today, 290 bbl cummulative. P Directional drill Alpine A lateral from 23,544.0 24,050 DRILL DDRL 10/20/2016 10/20/2016 12.00 PROD1 23,544' MD to 24,050' MD, 7,685' 00:00 12:00 TVD, ADT=10.03. 273 gpm, 4175 psi, ECD=11.32 ppg EMW, 180 rpm Tq on/off=17.5k/16.5k, 10-15k WOB. P/U=263k, S/O=N/A, ROT=160k. Continue dynamic connections with pump #1 holding 190 psi on annulus. Note- SPR's taken with 190 psi back pressure. Attempting to drop inc, several failed attempts to downlink resulted in B1 penetration @ 23,780' MD OA pressure @ 11:15 hrs=510 psi Tour seepage losses= 84 bbl. 0—n ,t Printed: 121112011 Page 41 I = Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Time 10/20/2016 End Time 10/20/2016 Dur(hr) Phase Op Code Activity Code TImeP-T-X 3.00 PROD1 DRILL DDRL P Operation Continueattem tin to drop Inc, control drill / directional drill Alpine A Start Depth (ftKB) End Depth (WEI) 24,050.0 24,117.0 12:00 15:00 lateral, varying parameters from 24,050' MD to 24,117' MD, 7,685' TVD, ADT=2.86. 277 gpm, 4255 psi, ECD=11.33 ppg EMW, 180 rpm Tq on/off=17.5k/16.4k, 10-15k WOB. P/U=260k, S/0=N/A, ROT=160k. Could not achieve drop with Powerdrive. Decision to POOH. 10/20/2016 10/20/2016 —6 25 1ROD1 DRILL CIRC T irculate astand each BUiMD to back 24,117.0 23,875.0 15:00 21:15 23,875' MD. Total pumped 22,000 stks, 2157 bbl. 10/20/2016 21:15 10/20!2016 2230 —1 25 PROD1 DRILL OWFF T lA/ MPD procedure. pressure perCPAI Shut in MPD chokes and Orbit valve, 23,875.0 23,875.0 monitor pressure increase for 15 min, rotate string 10 rpm. Pressure built to 22 psi and stabilized in 15 min. Perform exhale test, line up to trip tank and open chokes. Bled back .4 bbl in 10 minutes. Shut in chokes again, pressure built to 14 psi in 12 min, started rotary 10 rpm, pressure increased to 37 psi in 15 min, further to 83 psi in 40 min and stabilized. 10/20/2016 10/20/2016 0.25 PROD1 DRILL CIRC T Establish circulation to CBU, 280 gpm, 3980 psi, 100 rpm, 16.5k Tq. Shut 23,875.0 23,875.0 22:30 22:45 down, blow down top drive to confirm 10/20/2016 10/20/2016 O 0.75 PR DI DRILL WFF T fingerprint test. per CPA[ MPD procedure. tion Establisht ---23—,-875.0 23,875.0 22:45 23:30 rotation @ 10 rpm and allow torque to break over 12k. Shut in MPD chokes and Orbit valve, observe pressure build up to 77 psi in 15 minutes confirming test. 10/20/2016 10/21/2016 0.50 PROD1 DRILL CIRC T check lish cirinfluxla276 and b tin CpBU tofor 23,875.0 --T3—,875.0 23:30 00:00 OA pressure @ 22:00 hrs=500 psi Total seepage loss for tour=47 bbl, Daily =131 bbl, Cumulative interval=421 bbl. 10/21/2016 1.50 PROD' DRILL CIRC T inue10/21/2016 gpm, 4130trculating ps , 110 pm,o 685-1p5.5k 23,875.0 23,875.0 00:00 01:30 Tq @ 23,875' MD post fingerprinting. Small spike in gas just prior to bottoms up (6000 stks) and again at bottoms up (7200 stks) 0-124 units. 10/21/2016 10/21/2016 3.00 PROD1 DRILL CIRC T Circulate and weight up MOBM from 9.5 ppg to 9.7 ppg, 275 gpm, 4160 psi, 23,875.0 ---T3—,782.0 01:30 04:30 110 rpm, 15.5-16k Tq. Rack back stand @ bottoms up from 23,875' MD to 23,782' MD. paaP 42173 Report Printed: 12/1/2011 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Operation Start Depth (ftKB) End Depth (ftKB) Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X CIRC T weightMUBM 23'782.0 23,687.0 10/21/2016 10/21/2016 2.75 PROD1 DRILL 9 7 Pp9 tand �m 50 gpmp 04:30 07:15 4180-3560 psi, 110-100 rpm, 15.5k Tq. Rack back stand @ bottoms up from 23,782' MD to 23,687' MD. OWFF T Oq FF static, with rotary 10 rpm 12.5k 23,687.0 23,687.0 10/21/2016 10/21/2016 0.25 PROD1 DRILL 07:15 07:30 CIRC T 23,687.0 23,687.0 10/21/2016 10/21/2016 0.25 PROD1 DRILL with 100 rpm,ith weight, 12 59 Tqd 07:30 07:45 --p7ROD1 BKRM T BROOH from MD to 23, 687.0 22,161.0 10/21/2016 10!21/2016 4.25 DRILL MD @ 240 gpm3 3260 psi,1,68T 1 0 10 07:45 12:00 15k Tq. ECD=11.65 ppg EMW. P/U=250k, S/O= N/A, ROT=160k. Calc Fill=10 bbl, Actual Fill=40 bbl Mud loss for tour=41 bbl -[TROD -1 DRILL BKRM T ,019.0 22,161.0 21 10/21/2016 10/21/2016 2.75 21,019' MD @0240 gpm?3300 psD1t10 12:00 14:45 rpm, 14.4k Tq. ECD=11.60 ppg EMW. P/U=250k, able to obtain S/O= 103k (broke over @ 90k), ROT= 160k. PROD1 DRILL MPDA Te, flow 21,019.0 21,019.0 10/21/2016 10/21/2016 0.75 static. Change out MPD RCD element 14:45 15:30 due leaking. DRILL CIRC T rculate 21,019.0 20,734.0 10/21/2016 10/21/2016 6.00 PROD' MtD to 20,734'tMDs2 0-220 gpm19 15:30 21:30 3330-2820 psi, 110-100 rpm, 14.9- 14.4k Tq. After first bottoms up to clean hole, weight up active system from 9.9 ppg to 10.0 ppg and treat with viscosifier to prevent sag. DRILL OWFF T down top drive. Flow 20,734.0 20,734.0 10/21/2016 10/21/20'6 0.25 PROD' check well -bl{ w c. 21:30 21:45 SMPD T ip �outof hole from 20,734.0 19,018. 10/21/2016 10/22/2016 2.25 PROD' DRILL 20,734' MD to 19,01r8' MD per 21:45 00:00 stripping schedule, 1500 fph, 310 psi pulling and 50 psi in slips. Reduce pulling pressure to 280 psi due over hole fill. OA pressure @ 22:00 hrs=500 psi Loss for tour=80 bbl, Daily=121 bbl, Cummulative interval=542 bbl. - DRILL SMPD T le Continue ng out of hole tin pp 10/22/2016 10/22/2016 4.25 PROD' MD D t]Rede MPD from 19:5n 00:00 04:15 per stripping e, 280 psi pulling ani induce pulling press0 slips to 20 psi ovel.OA 11�5,72�9 pressure0 hsiLoss for tour Dbl,Cummulativel= DRILL SMPD T Stripshoe vith BHA from 29 15,729.0 5,. 10/22/20'6 10/22/2016 0.75 PROD1 ID with 10 pm rotary, ue WEPSto 04:15 05:00 reamer hanging up on shoe, observing 25-30k overpull. Pull into shoe with 10 rpm without issues, ROT= 195k to 15,550' MD.. Report Printed: 12/1/201E Pane 43173 11:30 111:45 10/22/2016 Rig: DOYON 19 y.au Time Log 11:45 Start Time End Time Dur (hr) Phase 10/22/2016 10/22/2016 05:00 10/22/2016 05:30 0.50 PROD1 ROT 10/22/2016 05:30 10/22/2016 07:00 1.50 PROD1 PROD1 10/22/2016 07:00 10/22/2016 07:30 0.50 PROD' 10/22/2016 10/22/2016 07:30 10/22/2016 11:30 4.00 PROD1 11:30 111:45 10/22/2016 1U/Z'Z/ZU10 y.au rnvv 11:45 21:15 10/23/2016 10/23. 10/22/2016 10/22/2016 0.25 PROD' 21:15 21:30 ROT -=158k. Rack back stand @ 10/22/2016 10/22/2016 0.75 PROD1 21:30 22:15 10/22/2016 10/22/2016 0.75 PROD' 22:15 23:00 10/22/2016 10/23/2016 1.00 I PROD1 23:00 00:00 10/23/2016 10/23) 00:00 01:00 Start Depth (ftKB) End 15,550.0 Depth (WB; 15,494.0 10/23/2016 10/23. 01:00 01:45 Operations Summary (with Timelog Depths) CD5-99 10/23/2016 10/23/2016 0.75I PROD1 01:45 02:30 Job: DRILLING ORIGINAL Op Code Activity Code Time P -T -X Establish Operation circulation, stage up to 260 Start Depth (ftKB) End 15,550.0 Depth (WB; 15,494.0 2ILL CIRC T gpm, 2830 psi, 60-80 rpm, 10.4k Tq. ROT -=158k. Rack back stand @ 15,494' MD. SILL CIRC T Continue circulate bottoms up, 270 15,494.0 15,494.0 gpm, 3190 psi, 80 rpm, 10.9k Tq, P/U=257k, S/0=128k, ROT=157k. SILL OWFF T Flow check for 30 minutes, static. 15,494.0 15,494.( RILL SMPD T Continue stripping out of hole with 15,494.0 12,171.( MPD from 15,494' MD to 12,171' MD per stripping schedule, 1500-2000 fph, 260-240 psi pulling and 20 psi in slips. OA pressure @ 12:00 hrs=300 psi RILL OWFF T Observe slight change in trip sheet 12,171.0 12,171.1 trend, from 3.5-4 bbl/5 stands to 3 bbl/5 stands (2.7 bbl Calc), pulling 4" 14# pipe. Shut down and flow check well, static. TRILL SMPD T Continue stripping out of hole with 12,171.0 998. MPD from 12,171' MD to 998' MD per stripping schedule, 2000-4000 fph, 240-100 psi pulling and 20 psi in slips. )RILL OWFF T Line up and flow check for 10 minutes, 998.0 998. static. )RILL MPDA T Remove RCD element and install trip 998.0 998 nipple as per MPD rep. OA @ 22:00 hrs=250 psi )RILL TRIP T POOH on elevators from 998' MD to 998.0 152 152' MD. Note: SLM out of hole and check hard banding for wear. Tool joints on stands #60 to #1 show significant wear. DRILL SHAH T Flow check static. Lay down BHA #8 152.0 C as per DD/MWD reps from 152' MD. Calc Fill=124.7 bbl, Actual Fill=179.5 bbl. Daily loss to formation=55 bbl, Cummulative=597 bbl. DRILL RURD T Clean and clear rig floor, prep and 0.0 PJSM on testing BOPE. SIMOPS- monitor well via trip tank, no gain/loss. WHDBOP RURD P Drain stack, pull wear ring and set test 0.0 plug with 4" test joint per FMC rep. SIMOPS- Line up hole fill on annulus to continuously monitor while testing. WHDBOP RURD P Clear mudlines of MOBM, rig up to 0.0 test BOPE. Flood and flush equipment and lines with water. Grease IBOP. Purge air from equipment/ lines. Perform body test on BOP, holding. Page 44173 .01 01 0.0 Report Printed: 12/1/201E Rig: DUYUN Vd Time Log Start Time End Time Dur (hr) Phase 10/23/2016 10/23/2016 6.75 PROD' 02:30 09:15 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth Code Activity Code Time P -T -X Operation (ftKB) End Depth (ttK 30P BOPE P Test BOPE with 4" and 4'/w' Test joints 0.0 0 250/3500 psi. AOGCC Bob Noble waived witness. Tested annular preventer to 250/2500 psi w/both test joints. Tested 3'/2' x 6" upper and lower VBR's w/both test joints, blind rams, choke valves #1-14, needle valve above #1, 4" kill line Demco, 4" XT39 Dart, 4" XT39 FOSV, HCR and manual choke and kill valves to 250/3500 psi for 5 minutes each. Flush poor boy degasser, test manual and super chokes to 1100 psi. Upper IBOP failed pressure test. Will change out upper and lower as assembly. 10/23/2016 10/23/2016 0.50 PR0D1 WHDBOP BOPE P Performed accumulator test. System pressure= 2950 psi, Pressure after 09:15 09:45 functioning rams and annular= 1525 psi, 200 psi attained=29 sec, Full system recovery=146 sec, 4 bottle N2 average= 2050 psi. Tested gas alarms and PVT alarm systems. 10/23/2016 10/23/2016 0.75 PR0D1 WHDBOP [URD P Rig down BOP test equipment, pull test plug and install 7.1875" ID wear 09:45 10:30 ring per FMC. Clean and clear rig floor. SIMOPS- Continue monitor well via trip tank. 10/23/2016 10/23/2016 —PJ DB 3.00 PROD, WHOP GRP T and remove / place auto anT manual IBOP together (pre -made up) 10:30 13:30 due to auto (upper) IBOP failed on BOP test. Install new 4" XT39 saver sub. 10/23/2016 10/23/2016 1.00 PROD, WHDBOP BOPE 250/3500 psi, 5 min each charted. ed. T and test auto and manual V13:30 250 10/23/2016 14:30 10/23/2016 2.00 PROD1 DRILL SVRG ler T and bell guide. Torque aRe-assemble top drive nd wiretieall 14:30 16:30 bolts. (This time period due from planned changing out of worn saver sub, not due IBOP) 10/23/2016 10/23/2016 0.75 PROD1 DRILL SVRG T Chancking on top drive, clean and cleae out swivel r rig floor. Lay 16:30 17:15 down bad IBOP. 10/23/2016 10/23/2016 2.00 IFR OD1 DRILL BHAH TPJSM 9. Change out Powerdr vde stabil staHA bilizer, PS reamer. 17:15 19:15 Make up BHA and bit, stand back in derrick. 10/23/2016 10/24/2016 4.75 PROD1 DRILL PULD T PJSM and lay down 41 stands 4" 147i drill pipe (Worn hard banding) from 19:15 00:00 derrick, via mousehole. Separate out good joints for re -run. OA pressure @ 22:00 hrs=210 psi Daily fluid lost to formation=12 bbl, Cummulative interval=609 bbl. 10/24/2016 10/24/2016 1.75 PROD1 DRILL PULD T Continue laying down 4" 141A DP (12 stands) via mousehole to pipeshed. 00:00 01:45 Monitor well via trip tank, —.5 bph static loss. 0.0 0.0 0.0 /2011 �' Rig: DOYON 19 Time Log Start Time End Time Dur (hr)FPRODI 10/24/2016 10/24/2016 0.75 01:45 02:30 Operations Summary (with Timelog Depths) CD5-99 02:30 03:00 21:15 10/24/2016 10/24/2016 2.25 PROD1 03:00 05:15 10/24/2016 10/24/2016 10/24/2016 0.50 PROD1 05:15 05:45 0.0 318.0 10/24/2016 10/24/2016 2.00 PROD1 05:45 07:45 10/24/2016 10/24/2016 0.50 PROD1 07:45 08:15 10/24/2016 10/24/2016 0.25 PROD1 08:15 08:30 10/24/2016 10/24/2016 2.50 PROW 08:30 11:00 10/24/2016 10/24/2016 0.75 PROD1 11:00 11:45 4,104.0 4,701. 10/24/2016 10/24/2016 0.25 FIR 1 11:45 12:00 10/24/2016 10/24/2016 5.50 PROD1 12:00 17:30 4,701.0 5,994. 10/24/2016 10/24/2016 2.50 FIR 1 17:30 20:00 10/24/2016 10/24/2016 0.25 PROD1 20:00 20:15 5,994.0 12,334 10/24/2016 10/24/2016 1.00 PROD1 20:15 21:15 10/24/2016 u -'1 " Clean and clear rig floor, prep 21:15 10/24/2016 HO F10/25/2016 22:00 SIMOPS- PJSM for P/U BHA #9 from 10/24/2016 23:30 00:00 100:45 Code DRILL DRILL ILL ILL LL L Job: DRILLING ORIGINAL Start Depth (ftKB) End Depth (ftKB) Code Time P -T -X T u -'1 " Clean and clear rig floor, prep 0.0 0.0 pipeshed or P/U 4" DP. SIMOPS- PJSM for P/U BHA #9 from derrick and P/U 4" DP from pipeshed. T Make up 6'/<" BHA #9 from derrick to 0.0 318.0 T 318' MD. Single in hole with 4" 14# DP from 318.0 2,208.0 318' MD to 2,208' MD T Shallow pulse test MWD @ 220 gpm 2,208.0 2,208.0 1560 psi, good. Blow down top drive, T install air slips. Continue singling in the hole from 2,208.0 4,104.( 2,208' MD to 4,104' MD T Fill pipe, continue pumping to check 4,104.0 4,104.( Orbit tool 220 gpm, 1767 psi. T Blow down top drive, Flow check well. 4,104.0 4,104.1 T Lay down and change out joints of 4" 4,104.0 4,701. DP, while continue singling in the hole from 4,104' MD to 4,701' MD. OA pressure @ 10:30 hrs=255 psi T RIH on stands from 4,701 MD to 4,701.0 5,994. T 5,994' MD Fill pipe, continue pumping to check 5,994.0 12,334 Orbit tool 220 gpm, 1767 psi. Blow down top drive. T RIH on stands, fill pipe every 20 5,994.0 12,334 stands from 5,994' MD to 12,334' MD, filling pipe every 20 stands. T Continue RIH, picking up 60 joints 4" 12,334.0 14,172 HWDP from pipe shed. T RIH on stands of 4" 15.7# DP 14,172' 14,172.0 14,93E MD to 14,939' MD. G T Establish circulation @ 220 gpm, 2850 14,939.0 14,95 psi. Real time log Gamma @ 250 fph from 14,939' MD to 14,973' MD to locate RA tag. Locate RA tag @ 14,899' (14,960' bit depth) 297 gAPI. P/U to 14,950', rotate 60 rpm and log down, locate RA tag at 14,896.5' (14,957.8' bit depth) 303 gAPI. 2.2' difference between slack off and rotating. P/U=240k, S/0=135k, ROT=172k. D T RIH on stands 01 4' 15.7# DP 14,957 14,957.0 15,5C MD to 15,506' MD. OA pressure @ 22:00 hrs=200 psi )C T OWFF static, slip and cut 85' drilling 15,506.0 15,5( line. Calibrate block height for Totco and SLB. �G T Service topdrive, draw works and iron 15,506.0 15,51 roughneck. Daily mud to formation=11 bbl, Cummulative interval=620 bbl DA T PJSM, Remove trip nipple and 15,506.0 15,5 installed RCD bearing. o,......+ Drintntl[ 12111 Time Log Rig: DOYON 19 Start Time Op Code Activity Code MP End Time Dur (hr) Phase 10/25/2016 10/25/2016 15,506.0 15,506.0 15,506.0 15,506.0 0.25 PROD1 MPDA DRILL SMPD 00:45 01:00 DRILL REAM DRILL DDRL 23,847') W&R f/23,847' to 24,117' w/200 gpm, T 3600 psi, 60 rpm, 7.4 k trq P Drill ahead f/24,1Ir to 24,556' MD / 7,694' TVD, ADT 4.03 hrs, ECD 11.41 ppg, 240 gpm, 4350 psi, PU wt 255 k, SO wt N/A, ROT wt 170 k, 140 rpm, 10/25/2016 10/25/2016 2.00 PROD1 01:00 03:00 Drill ahead !. :4, 66' to 24,665'MD/ 7,691' TVD, ADT .83 hrs, (Having 24,556.0 24,665.1 10/25/2016 10/25/2016 0.25 PROM DRILL CIRC 03:00 03:15 with no success. Increased to 60 second intervals with the rotational 10/25/2016 10/25/2016 0.50 PROD' 03:15 03:45 positive response from tool. 10/25/2016 10/25/2016 24,665.0 25,275 9.00 PROD' 03:45 12:45 DRILL DDRL P Drill ahead f/25,275' to 26,217' MD / 7,701' TVD, ADT 7.78 hrs, ECD 11.63 ppg, 240 gpm, 4350 psi, PU wt 265 k, SO wt N/A, ROT wt 170 k, 140 rpm, 10/25/2016 10/25/2016 4.75 PROD1 12:45 DRILL DDRL 17:30 26,217.0 27,12E 10/25/2016 Longest well in state of Alaska 10/26/2016 6.50 PROD1 17:30 27,128.0 26,74 00:00 19.2-18.4 Tq. 00:00 01:45 10/26/2016 10/26/2016 1.25 01:45 03:00 10/26/2016 110/2b. 03:00 12:00 III 12:00 00:00 10/27/2016 110/27/20 00:00 12:00 10/27/2016 10/27/2016 10. 12:00 22:45 10/27/2016 10/27/2016 0 22:45 23:15 23:15 00:00 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL DRILL' Op Code Activity Code MP Time P -T -X Operation T Line up MPD manifold and establish circulation & break in RCD bearing as Start Depth (ftKB) End Depth (ftKB) ---T- 15,506.0 15,506.0 DRILL DRILL CIRC CIRC per MPD rep T Circ B/U w/220 250 gpm, 3300 3820 psi, 80 - 50 rpm, 9 - 10 k trq T SPR's & T&D parameters. 15,506.0 15,506.0 15,506.0 15,506.0 DRILL MPDA DRILL SMPD T B/D top drive. Line up MPD equipment to strip in hole. PDas per schedule l@ T Strip in (/15,506' toe23 847' (LoS/O wt 15,506.0 15,506.0 15,506.0 -----23,847.0 DRILL REAM DRILL DDRL 23,847') W&R f/23,847' to 24,117' w/200 gpm, T 3600 psi, 60 rpm, 7.4 k trq P Drill ahead f/24,1Ir to 24,556' MD / 7,694' TVD, ADT 4.03 hrs, ECD 11.41 ppg, 240 gpm, 4350 psi, PU wt 255 k, SO wt N/A, ROT wt 170 k, 140 rpm, 23,847.0 24,117.0 24,117.0 24,556.( 19.7/15.7 k ft/lbs trq, 15 k wob DRILL Drill ahead !. :4, 66' to 24,665'MD/ 7,691' TVD, ADT .83 hrs, (Having 24,556.0 24,665.1 7DDRL4PFI issues downlinking to tools) DRILL CIRC Unable 2 /bl Attempted to downlink pwith s at rotation at 36 second intervals, again 24,665.0 24,665. with no success. Increased to 60 second intervals with the rotational downlink, off bottom, and had a positive response from tool. DRILL DDRL P Drill ahead f/24,665' to 25,276 MD / 7,696' TVD, ADT 6.3 hrs, ECD 11.45 ppg, 240 gpm, 4280 psi, PU wt 280 k, SO wt N/A, ROT wt 173 k, 140 rpm, 24,665.0 25,275 18.3/14.5 k ft/lbs trq, 15 k wob DRILL DDRL P Drill ahead f/25,275' to 26,217' MD / 7,701' TVD, ADT 7.78 hrs, ECD 11.63 ppg, 240 gpm, 4350 psi, PU wt 265 k, SO wt N/A, ROT wt 170 k, 140 rpm, 25,275.0 26,217 19.7/14.8 k ft/lbs trq, 15 k wob DRILL DDRL P Drill ahead f/26,217' to TD of 27,128' MD / 7,716' TVD, ADT 829 hrs, ECD 11.42 ppg, 235 gpm, 4240 psi, PU wt 275 k, SO wt N/A, ROT wt 164 k, 140 rpm, 19.9/16.5 k ft/lbs trq, 15 k wob 26,217.0 27,12E Longest well in state of Alaska 1 CASING CIRC P Circulated 4x BU f/ 27,129' to 26,747' MD, racking back 1 stand per BU. 236 gpm, 4340-4260 psi, 140-90 rpm, 27,128.0 26,74 19.2-18.4 Tq. 1 CASING OWFF T Attempted to fingerprint formation. RCD element leaked and test was 26,747.0 26,74 inconclusive. Decision was made to 1 CASING CIRC weight up to 9.7 ppg MW - P Start weighting up MW from 9.5 ppg to 9.7 ppg. 235 gpm, 4250 psi, 100 rpm, 26,747.0 26,74 17.6 Tq. Report Printed: 12/11, Page 4111-1 01 Operations Summary (with Timelog Depths) C D5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Time 10/28/2016 00:00 End Time 10!28/2016 03:00 Dur (hr) Phase 3.00 PROD1 Op Code CASING ActiviTy Code Time P -T -X CIRC P Operation Weighted up MW from 9.5 ppg to 9.7 W ppg. 235 gpm, 4300 psi, 100 rpm, 16.3 Tq. start Depth (ftKB) End Depth (ftKB) 26,747.0 26,747.0 10/28/2016 03:00 10/28/2016 10/28/2016 03:15 10/28/2016 0.25 PROD1 3.75 PROD1 CASING CASING OWFF P CIRC P O 7 ppgeMWell for flow. Well Static w/ MW fooetript s gin and rackedpback one 26,747.0 26,747.0 26,747.0 26,652.0 03:15 07:00 stand. 230 gpm, 4250 psi, 17.5 Tq. 10/28/2016 10/28/2016 10/28/2016 07:30 10/28/2016 0.50 PROD1 0.25 PRO51 CASING CASING OWFF P CIRC Observed well for flow. Well Static w/ 9.9 ppg MW TookSPRandrecorded S/Oo at 26652' MD 26,652.0 ,. ---f6-,652. 26,652.0 2,607:00 52.0 07:30 10/28/2016 07:45 10/28/2016 0.75 PROD1 CASING MPDA P hnnew element with 200 gpm, 100 broke 26,652.0 07:45 08:30 rpm, 17.5 Tq. 10/28/2016 10/28/2016 3.50 PROD' CASING BKRM P O/ 2665Z -to25413' MID at 3700-4200 psi, 1 0 rpm200 BR0gpm373 26,652.0 25,413.0 08:30 12:00 and 17 Tq. 10/28/2016 10/28/2016 6.50 PROD1 CASING P BRA 9Pmf/42001psi 100 pm, and 16.5 25,413.0 23,031.0 12:00 18:30 �BKRM Tq. S/O = 120k, P/U = 165k 10/28/2016 10/29/2016 5.50 PROD1 CASING CIRC P Circulated i culat pax B6 Tq. Ra 20 cP g back0' 23,031.0 22,841.0 18:30 00:00 stand per BU f/ 23,031' to 22,841' MD. 10/29/2016 10/29/2016 1.25 PROD1 CASING CIRC P Finished circulating 3x BU at 320 gpm, 4050 psi, 110 rpm, 15 Tq. 23,031.0 22,841.0 00:00 10/29/2016 01:15 10/29/2016 0.50 PROD1 CASING OWFF P OAT , well static with 10 ppg MW. 22,841.0 22,841. 01:15 10/29/2016 01:45 01:45f 10/29/2016 09:00 7.25 PROD1 CASING SMPD P 6Dm holding b back pressure as schedual. P/U= 250k, S/O= 133k. 22,841.0 15,506.0 10/29/2016 09:00 10/29/2016 12:00 3.00 PROD1 CASING REAM T Cleanecasing shoe. Started and polished eami g8through with 225 gpm, 3100 psi, 80 rpm, 9.5 15,506.0 15,506.0 Tq and observed 30k WOB on the down. Worked through shoe several times, cleaning the shoe and reducing drag. 10/29/2016 10/29/2016 0.50 PROD' CASING REAM P Finaliparameters after cleanued reaming the 7 ning; 265 15,506.0 15,697.0 12:00 12:30 gpm, 4280 psi, 40 rpm, 12k Tq, with P/U= 245k, S/O= 130k, ROT= 175k. No obstructions observed. 10/29/2016 10/29/2016 1.50 PROW CASING CIRC P C dat270 gpmi,14300 psi, 80 pm, 11 15,697.0 15,506.0 12:30 10/29/2016 14:00 10/29/2016 14:30 14:00 10/29/2016 14:30 10/29/2016 15:00 0.50 PROD1 0.50 PROD1 CASING CASING OWFF P SMPD P Tq down top l static. SimOps, blow SOOH f/ 15,506' to 15,030' MD holding 240 psi pulling and 80 psi in slips. 15,506.0 15,506.0 15,506.0 15,030.0 10/29/2016 10/29/2016 1.75 PROD1 CASING LOG P Logged the Alpine C for correlation f/14,970' to 15,080' MD (15,030'- 15,030.0 15,126.( 15:00 16:45 15,142' Bit Depth). 260 gpm, 3820 10/29/2016 10/30/2016 7.25 PROD1 CASING SMPD P psi, 60 rpm, 10 Tq. Pump f/ 5,126'bl, 12 ppg dry613' M and SOOH f/ 15,126'to 5,613' MD holding 15,126.0 5,613.1 16:45 00:00 160-140 pulling and 80-20 psi in slips. Printed: 12/1/201 i� Operations Summary (with Timelog Depths) CD5-99 Time Log upei e..„.. Soo -I f/ 5,613' MD to 1,067 MD ::5,613.0 holding 140 psi pulling and 60 psi in Start Time End Time our (hr) Phase CASING Op Code SMPD Activity Code Tin P 10/3112016 10/30/2016 3.00 PROD1 min, well static. 00:00 03:00 Removed RCD bearing and installed 1,607.0 trip nipple. 10/30/2016 10/30/2016 1.00 PROD1 CASING CIRC 310.0 P 03:00 04:00 OWFF, Slight drop in fluid. 127.0 10/30/2016 10/30/2016 0.75 PROD1 CASING rig floor. MPDA P 04:00 04:45 Actual= 179 bbl. 10/30/2016 10/30/2016 0.75 PROD' CASING TRIPJ 04:45 05:30 0.0 w/Frac sleevesas per tally to 11,809' 10/30/2016 10/30/201612.75 PROD1 CASING BHAH 05:30 05:45 make up to 4 1/2" liner. SCMT 10/30/2016 10/30/2016PRO D1 CASING OWFF 05:45 06:00 equipment. P 10/30/2016 10/30/2016PROD1 11,845.0 CASING BHAH 06:00 08:45 11,948.0 S/0= 120k Circulate & condition mud w/2 - 3 bpm 10/30/2016 10/30/2016 1.00 COMPZI CASING RURD P 08:45 09:45 SIMOPS - P/U & rack back in derrick 10 stands HWDP. 10/30/2016 10/30/2016 Obtained T&D readings. P/U= 195k, 12.75 COMPZ1 CASING PUTB F 09:45 22:30 p RIH with 4" DP f/ 15,553 to 24,158' 15,553.0 10/30/2016 10/31/2016 1.50 COMPZ1 CASING OTHR F 22:30 00:00 25,080.0 several times to work pike free with pumps on, 100 gpm, 1200 psi. P/U 10/3'/2016 10/31/2016 0.50 COMPZ1 CASING OTHR F 00:00 00:30 T Reduced MW to 9.8 ppg and added 25,080.( beads. Reciprocated pipe @ 71-104 10/31/2016 10/31/2016 0.50 COMPZ1 CASING CIRC I 00:30 01:00 10/31/2016 10/31/2016 2.50 (OMPZ1 CASING RUNL 01:00 03:30 10/31/2016 10/31/2016 2.50 COMPZ1 CASING CIRC 03:30 06:00 10/31/2016 10/31/2016 0.50 COMPZ1 CASING OTHR 06:00 06:30 10/31/2016 10/31/2016 5.50 COMPZ1 CASING RUNL 06:30 12:00 10/31/2016 10/31/2016 1.00 COMPZ1 CASING RUNL 12:00 13:00 10/31/2016 10/31/2016 2.00 (OMPZ1 CASING CIRC 13:00 15:00 10/31/2016 11/1/2016 9.00 COMPZ1 CASING CIRC 15:00 00:00 Nage Job: DRILLING ORIGINAL Depth Kai End e P -T -X upei e..„.. Soo -I f/ 5,613' MD to 1,067 MD ::5,613.0 holding 140 psi pulling and 60 psi in slips. Functioned ann, upper, and lower 1,067.0 rams. Circulated clean at 210 gpm, 1220 psi, 30 rpm, 1 Tq. OWFF 15 min, well static. Removed RCD bearing and installed 1,607.0 trip nipple. POOH f/ 1,067 to 310' MD. 1,607.0 Racked back jars and HWDP f/ 310' to 310.0 127' MD. OWFF, Slight drop in fluid. 127.0 L/D BHA as per SLB. Clean and clear 127.0 rig floor. Calculated trip Disp= 140.43 bbl, Actual= 179 bbl. P/U 4 112" liner running equipment. 0.0 R/U power tongs and tubing elevators. Run 4 1/2" 12.6# L-80 TXP linere 0.0 w/Frac sleevesas per tally to 11,809' MD. P/U= 69k, S/O= 72k. Change out elevators and P/U liner11,809.0 hanger. P/U SCMT logging tool and make up to 4 1/2" liner. SCMT activatted at 23:23 10/30/16. Mix and pour Pal Mix in liner tie back. 11,845.0 Clean and clear floor of 4 1/2" running equipment. Brake circulation and washed down 1 11,845.0 stand. 84 gpm, 450 psi RIH on 4" DP f/ 111948' to 15,459' MD. 11,948.0 S/0= 120k Circulate & condition mud w/2 - 3 bpm 151459.0 @ 590 - 800 psi. Even mud wt 9.8 ppg In/Out, P/U wt= 185 k, SID wt = 120 k. SIMOPS - P/U & rack back in derrick 10 stands HWDP. P Obtained T&D readings. P/U= 195k, 15,553.0 S/O=120k, ROT= 150k. 10 rpm w/ 7k Tq, 20 rpm w/ 7k Tq. p RIH with 4" DP f/ 15,553 to 24,158' 15,553.0 MD. S/O= 97k p Continue RIH f/ 24,158 to 25,080' MD 24,158.0 T Unable to P/U or S/O. Attempted 25,080.0 several times to work pike free with pumps on, 100 gpm, 1200 psi. P/U FOSV and working joint of DP. worked 14 wraps in to the pipe with 7k Tq and string came free. T Reduced MW to 9.8 ppg and added 25,080.( beads. Reciprocated pipe @ 71-104 gpm, 1100-1200 psi, 2-9 rpm, and 8k tq. P/U= 245, S/0= 120. P lv 307.0 31310.0 127.0 127.( 11,809.0 11, 845.0 11,845.0 11,948.0 15,459.0 15.553.0 24,1 25,( .0 Operations Summary (with Timelog Depths) r� CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Operation Start Depth (ftKB) End Depth (WEI) Start Time End Time Dur (hr) Phase Op Code Activity Code TimeP-T-X Finished reducingMW to 9.8 ppg CIRC T 25,080.0 25,080.0 11/1/2016 11/1/2016 0.25 COMPZ1 CASING while reciprocating pipe. 100 gpm, 00:00 00:15 1050 psi, 4 rpm, 8 TQ. Pumped 20 bbl, 10 ppg dry job. 0.25 COMPZ1 CASING OWFF T OWFF, Well Static. 25,080.0 25,080.0 11/1/2016 11/1/2016 00:15 00:30 P UD d resume RIH f/ ngto 25,080.0 26,63 . 11/1/2016 11/1/2016 1.25 C0MPZ1 CASING RUNL 25 s 26 Ti a 00:30 01:45 in toet RUNLP IH liner 26,636.0 27,071.0 11/1!2016 11/1/2016 1.75 COMPZ1 CASING depth 27 to rarer differentially636 01:45 03:30 stuck while in slips. Set torque stall to 7 k ft/lbs of torque and applied right hand rotation. Had to work pipe up w/300 k max & block wt down to break differential and get pipe moving. Once pipe free & rotating, rotated pipe to bottom w/5 - 10 rpm @ 7 k ft/lbs of torque, 125 k free slack of rotating wt, and no pumps. CIRC P Established circulation at 65=gpmand 27,071.0 27,071.0 11/1/2016 11/1/2016 0.50 COMPZ1 CASING 1050 psi. 03:30 04:00ke CASING PACK P hanger and packer liDropped 27,071.0 15,226.0 11/1!2016 11/1/2016 3.25 COMPZ1 29/32' 11 andner per Baker. 04:00 07:15 circulated down at 2.5 bpm, 1250 psi. Slowed to 1 bpm at 1000 stk. Ball seat at 1474 stk and pressured up to 2000 psi. Held pressure and S/O to 80k to set hanger. Pressured up to 4010 psi and did not see indication that pusher tool sheared or ball blow off seat Bled off and P/U 5.5' to expose dog subs. Slacked off to 60k while rotating at 10 rpm to ensure ZXP packer was set. Tested annular to 2000 psi and held. Pressured back up to 4700 psi with test pump to shear ball seat and bled off. (Shoe @ 27,071'& TOL 15,226') COMPZ1 WELLPR TRIP P POOH of liner top &rack baxk 2 15,226.0 15,157.0 1/1/2016 0.25 stands of DP f/15,226' to 15,157' CIRC T Weight up top 10 ppg mud at 6.5 bpm, 15,157.0 15,157.0:30 F07:1507:30 1/1/2016 3.00 COMPZ1 WELLPR 2840 psi and pumped 35 bbl, 11.7 ppg dry job. COMPZ1 WELLPR QEVL P P 4'r MD at 6he 15,157.0 13,041.0 11/1/2016 11/1/2016 3.00 00 ft/hr, logging with CMNT tool. 10:30 13:30 P/U= 240k. 1.50 COMPZ1 WELLPR PULD P sHWDP 13,041.0 12,118.0 11/1/2016 11/1/2016 f/13,041'to12,118' 13:30 15:00 WELLPR SLPC P Sliprad cut 105' of drill line. Service 12,118.0 12,118.0 11/1/2016 11/1/2016 1.50 COMPZ1 p d 15:00 16:30 WELLPR TRIP P POOH f/ 12,118' MD to 2,556' MD. 12,118.0 2,556.0 11/1/2016 11/2/2016 7.50 COMPZ1 16:30 00:002,556.0 COMPZ1 WELLPR TRIP P Caallccul 95.0 11/2/2016 11/2/2016 1.50 ted DispM 95.165bbl, Act.= 96 00:00 01:30 bbl 11/2/2016 11/2/2016 1.50 C0MPZ1 WELLPR BHAH P ner runnniing toolD logging twhile monitoriool assy. and ng well on 95.0 0•( 01:30 03:00 TT. 11/2/2016 11/2/2016 0.50 COMPZ1 WELLPR BHAH P Clean and clear rig floor. 0.0 0.1 03:00 03:30 _ i,,,-7, Report Printed: 12/1/201 11/2/2016 Rig: DOYON 19 1 Time Log 09:00 End Depth (ftKB) 0.0 227.0 11/2/2016 11 /2/2016 Start Time End Time our (hr) Phase 11/2/2016 11/2/2016 11/2/2016 0.50 COMPZ1 P 03:30 04:00 C 22:00 22:45 11/2/2016 11/2/2016 3.50 PROD2 22:45 04:00 07:30 TRIP P 11/2/2016 11 /2/2016 1 07:30 09:00 End Depth (ftKB) 0.0 227.0 11/2/2016 11 /2/2016 0 09:00 09:15 11/2/2016 11/2/2016 12 09:15 22:00 P 11/2/2016 11/2/2016 C 22:00 22:45 DHEA 11/2/2016 11/2/2016 1,648.0 22:45 23:45 00:45 75 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Code 00 Activity Code SVRG Time P -T -X P P Operation Serviced top drive, repaired grease zert and inspected saver sub. Mobilize milling BHA and whipstock assy. to the rig floor. M/U milling assy. and scribe to the MWD (29.65 Deg. Start Depth (ftKB) O 0 0.0 End Depth (ftKB) 0.0 227.0 PR iT BHAH left of MWD). M/U whipstock assy and attached mill to mill w/ 45k bolt. 00:00 TRIP P RIH BHA# 10 whipstock and mill f/ 227' to 1,648' MD. 227.0 1,648.0 ST 11/3/2016 DHEA P MWD shallow hole test, test good. 1,648.0 1,648.( ST 00:45 TRIP P pipefevery 20 stands. 4CalcMD, ul Calculated Disp.= 90.5 bbl, Act.= 86 bbl S/0= 1,648.0 15,040.( ST OG :HO P 93k. Logged f/ 15,040' to 15,090' MD 2 times and logged RA tag at 14,898' MD (15,069' bit depth). 100-500 fph, 15,040.0 15,090., ST HPST SO P 220 gpm, 2240 psi. Oriented whipstock 24 deg. left of high side and washed down to tag top of 15,090.0 15,232. ST 00:45 01:15 liner hanger. Observed seals entering SBE at 15,228' MD and locator tagged several attempts to shear 45k shear at 15,232' MD with 7k down weight. --T5,232.0 15,232, 11/2/2016 11/3/2016 0.25 PROD2 WHPST RURD P R/U to test seals to 10 ps,. 23:45 00:00 -P-RTS 15,232.0 P SBE tor1000tpsiP tag ng up from500 15,232.0 11/3/2016 11/3/2016 0.75 PROD2 WHPST 00:00 00:45 psi to 750 psi. Pressure test held. Rig floor was cleared of testing equipment. 11/3/2016 11/3/2016 0.50 PROD2 HPST WPST P Set up torrp anchor with 15k confirm with 10k over pull. Made wn, picked 15,232.0 15;121.0 00:45 01:15 several attempts to shear 45k shear bolt. Worked pip up to 240k (10 k overpull) and worked pipe down with 70k weight on bit. Broke circulation w/5 bpm. Made a total of 6 attempts & sheared bolt on up stroke. Top of whipstock without rotation @ 15,121' MD. 15,134.0 ►- MILL P Mill window f/ 15,121' to 15,134' MD at 275 gpm, 3450 psi, 100 rpm, 10-14K 15,121.0 3.75 PROD2 WHPST Tq. Pumped 25 bbl suppersweep once through 7 5/8" casing. (Tagged top of whipstock with rotationm with milling assembly @ 15,117') ;11/3/2016 ;07:45 DDRL P Drilled new formation from 15,134' to 15,154' MD. 270 gpm, 3450 psi, 100- 15,134.0 15,154.0 1.50 PROD2 WHPST 05:00 120 rpm, 10-14k Tq. REAM PDes through in 270 gpmking stri g,15,154.0 15,1190 6 1.25 PROD2 WHPST 100 rpm, 11-13k Tq. Pull back in to window. 11/3/2016 11/3/2016 0.25 PROD2 WHPST 15,119.0 OWFF P OWFF, Well static 15,119.0 07:45 11/3/2016 08:00 11/3/2016 1.25 PROD2 WHPST CIRC P Circulate BU while reciprocating to condition mud, UD 1 stand. 15,119.0 15,089. 08:00 09:15 Page 51173 Report Printed: 12/11201( Kig: DOYON 19 Time Log Start Time End Time our (hr) Phase 11/3/2016 11/3/2016 1.00 PROD2 09:15 10:15 11/3/2016 11/3/2016 10:15 10:45 11/3/2016 11 /3/2016 10:45 11:30 11 /3/2016 11 /3/2016 11:30 12:15 11/3/2016 11 /3/2016 12:15 12:45 11/3/2016 11/4/2016 12:45 00:00 1-1/4/2016 11/4/2016 00:00 04:30 11 /4/2016 T1 -T4-1 2 0-16 04:30 05:00 11/4/2016 11 /4/2016 05:00 06:15 11!4/2016 11 /4/2016 06:15 06:30 11 /4/2016 11/4/2016 06:30 08:15 11 /412016 11 /4/2016 08:15 08:30 11 /4/2016 11 /4/2016 08:30 10:00 11/4/2016 11/4/2016 10:00 11:15 11 /4/2016 11 /4/2016 11:15 11:45 11 /4/2016 11 /4/2016 11:45 13:45 0.75 6-75 .25 0.50 1.75 P Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Activity Code FIT CIRC MPDA SMPD Time P -T -X P in P P P Operation Rigged up test equipment. Performed FIT to 12 ppg EMW with 10 ppg OBM the hole and 780 psi back pressure, test held. Bled off pressure, blew down lines, and rigged down test equipment. Obtained slow pump rates and B/D TD. RemovedTrip nipple, installed RCD and warmed up elements. SOOH f/ 15,089' to 14,643MD while holding BP as per stripping schedule. Start Depth (MB) End 15,089.0 El5,089F15,089-0 5,089bearing, 15,08 Depth (ftKB) 15;089.0 Op Code IPST IPST IPST IPST CIRC P Pumped 20 bbl, 11.7 ppg dry job and B/D TD. 14,643.0 14,643.0 TP —ST P SOOII f/14,643' to 4,132' MD while holding BP as per stripping schedule. UD 20 stands HWDP & culled out bad joints of 4" 14# DP (48 jts total). 14,643.0 4,132.0 IPSTSMPD SMPD P SOOH f/4,132' to 1,063' MD while holding BP as per stripping schedule. Culled out bad joints of 4" 14# DP. 4,132.0 1,063.0 HPST OWFF P OWFF, well static. Simops, Blow down MPD system. 1,063.0 1,063.0 HPST MPDA P Removed RCD bearing and installed trip nipple as per MPD advisor. 1,063.0 1,063.0 'HPST O WFF P OWFF, well static. 1,063.0 1,063.0 HPST TRIP P POOH f/ 1,063to 117' MD. (UD 108 jts total 106 bad hard band & 2 good). 1,063.0 117.0 (HPST OWFF P OWFF, well static. 117.0 117.0 /HPST BHAH P UD milling BHA as per Baker rep. 117.0 0.0 JHPST ,iuocT RNnH P Clean and cleared rig floor. 0.0 0.0 0.01 0• 5 RURD P I Pnesest w/ test joint, pult l wear BOPE and fill I I -*- Page 52173 Report Printed: Operations Summary (with Timelog Depths) CD5-99 Rig: DOYVN IU Time Log Start Time End Time Dur (hr) Phase 11/4/2016 11/4/2016 6.50 PROD2 WF 13:45 20:15 11/4/2016 11 /4/2016 t .uu 20:15 21:15 Operation 11/4/2016 11/4/2016 2.25 21:15 23:30 BOPE with 4" and 4'/2' Test joints 11/4/2016 11/5/2016 0.50 23:30 00:00 psi. AOGCC Lou Grimaldi 11/5/2016 11/5/2016 2.25 00:00 02:15 witness. Tested annular to 11/5/2016 11/5/2016 1.75 02:15 04:00 psi w/both test joints. Tested 11/5/2016 11/5/2016 0.50 04:00 04:30 x 6" upper and lower VBR's 11 /5/2016 11 /512016 4.00 04:30 08:30 test joints, blind rams, choke 11/5/2016 11/5/2016 9.25 08:30 17:45 #1-14, needle valve above #1, 11/5/2016 11/5/2016 u.io rr 17:45 18:30 Operation 11/5/2016 11/5/2016 1.00 PI 18:30 19:30 BOPE with 4" and 4'/2' Test joints 11 /5/2016 11 /5/2016 0.75 PI 19:30 20:15 psi. AOGCC Lou Grimaldi 11/5/2016 11/5/2016 0.75 P 20:15 21:00 witness. Tested annular to 11/5/2016 11 /512016 0.25 P 21:00 21:15 psi w/both test joints. Tested Ti /5/2016 -11/6/2016 2.75 P 21:15 00:00 x 6" upper and lower VBR's Job: DRILLING ORIGINAL Code Activity Code Time P -T -X Operation Start Depth (ftKB) End 0.0 Depth (ftKB) 0.0 SOP BOPE P Test BOPE with 4" and 4'/2' Test joints 250/3500 psi. AOGCC Lou Grimaldi waived witness. Tested annular to 250/2500 psi w/both test joints. Tested 3'/2' x 6" upper and lower VBR's w/both test joints, blind rams, choke valves #1-14, needle valve above #1, 4" kill line Demco, 4" XT39 Dart, 4" XT39 FOSV, HCR and manual choke and kill valves to 250/3500 psi for 5 minutes each. Flush poor boy degasser, test manual and super chokes to 1100 psi. Test auto and manual IBOP to 250/3500 psi, 5 min each charted. Performed accumulator test. System pressure= 3000 psi, Pressure after functioning rams and annular= 1500 psi, 200 psi attained=24 sec, Full system recovery=144 sec, 4 bottle N2 average= 2100 psi. Tested gas alarms and PVT alarm systems. BOP RURD P R/D BOP test equipment, pulled test 0.0 0.0 plug, and UD test joint. Installed 7.125" ID wear ring. ST SVRG P Changed out saver sub and sevice 0.0 0.0 TD. ST BHAH P P/U BHA equipment to rig floor. 0.0 0.0 'ST BHAH P M/U 6 3 /4" Drilling BHA #11 as per 0.0 308.0 SLB. Changed out stabilizer on Orbit Tool to diamond impreg stab. ST PULD T Single in hole f/ 308' to 1,716' MD with 308.0 1,716.0 4" 14# DP from pipe shed with new hard banding. 'ST DHEQ P Shallow test MWD tool wl 220 gpm, 1,716.0 1,716.0 1480 psi, 85k string weight. 'ST PULD T Continue singling in hole f/ 1.716' to 1,716.0 5,668.0 5,668' MD with 4" 14# DP w/ new hard banding. Fill pipe every 15 stands. 'ST TRIP P RIH f/ 5,668' to 14,853' MD out of 5,668.0 14,853.0 derrick, filling every 15 stands and strapping stands on the way in. Calculated Disp.= 88.9 bbl, Act.= 64 bbl. 'ST DLOG P Log RA tag at 14,893' MD with 240 14,853.0 14,949.( gpm, 3080 psi, and 100 fph. B/D TD. PST SVRG P Slip & Cut 53' of drill line. 14,949.0 14,949.( PST SVRG P Service TD, DW, and tighten deadman 14,949.0 14,949.( bearing. PST MPDA P Pull trip nipple and install RCD 14,949.0 14,949.1 bearing. P/U= 215k, S/O= 130k PST MPDA P Break in RCD bearing and pump up 14,949.0 15,044.1 survey at 240 gpm, 50-100 rpm. PST CIRC P Reduce MW f/ 10 ppg to 8.8 ppg at 15,044.0 15,044. 245-260 gpm, 3610 psi, 60 rpm, and 8.5k Tq. Nage 2111201 Rig: DOYON 19 Time Log 11116/2016 06:45 1.1 11/6/2016 Start Time End Time Dur (hr) Phase 11/6/2016 11/6/2016 2.75 PROD2 00:00 02:45 11/6/2016 11/6/2016 0.75 PROD2 02:45 03:30 11/6/2016 11/6/2016 0.25 PR0D2 03:30 03:45 15,04 VHPST 11/6/2016 11/6/2016 0.50 PROD2 03:45 04:15 11/6/2016 11 /6/2016 1.50 PROD2 04:15 05:45 215k, S/O= 125k. 11 /6/2016 05:45 11116/2016 06:45 1.1 11/6/2016 11 /6/2016 2• 06:45 09:00 2980 psi, 60 rpm, 9k Tq while 11/6/2016 11/6/2016 0. 09:00 09:45 09:45 112:00 11 /6/2016 11 /7/2016 I 1 12:00 00:00 11 /712016 11/7/2016 00:00 04:00 11 /7/2016 111/7/2016 04:00 07:45 Operations Summary (with Timelog Depths) CD5-99 3.751 PROD2 Job: DRILLING ORIGI Start Depth Code Activity Code Time P -T -X Operation (ftKB) End Depi PSC' late and condition 15,044.0 15, VHT CIRC P Continued to ircu mud to 8.8 ppg MW, 260 gpm, 3610- 2980 psi, 60 rpm, 9k Tq while maintaining 10 ppg EMW w/ MPD. OWFF P Close choke to look for pressure, 15,04 VHPST opened up and OWFF, well static. CIRC P SPR's 15,04 VHPST WASH P IVID to 1psi, 184 15,04 VHPST gpm, 4905,044! ndVa"senter OH. P/U= 215k, S/O= 125k. REAM P Washed and reamed through window 15,1 NHPST o f/ 15,139' MD to base f hole at 15,154' MD, 260 gpm, 2790 psi, 30-50 rpm, 10-15k Tq. Stalled out 2x with near bit stay at BOW, P/U to release torque reduced pumps to 180 gpm, 1550 psi, 50 rpm, 9-10.5k Tq, and worked stay in to OH. P/U= 215k, S/0= 125k, Rot= 165k. DDRL P Drill f/ 15,154' to 15,182' MD, 7,516' DRILL TVD. DRILL CIRC T Circulated and conditioned mud while 15,1 trouble shooting Orbit turbine issues. :TT 230-270 gpm, 2350-3120 psi, 50-30 rpm, 8k Tq. DRILL CIRC Pump low/high vis. sweep, 5 bbl 15,1 LVT200 by 35 bbl Hi -vis pill at 270 gpm, 3120 psi, 30 rpm, and 8k Tq to clear/clean Orbit turbine. DRILL -FD-RLP- Drill ahead 15,1 ADT12 2.85hrs,7ECD 9.94/ ppg, 260 gpm, 2970 psi, P/U wt 215 k, SO wt 125 k, ROT wt 150 k, 160 rpm, 11.5/8 k ft/lbs trq, 5-18 WOB. Pumped Lo/Hi Vis anti jamming sweeps to free up lower torquer on power drive. DRILL DDRL P Drill ahead V 15,301' to 16,377' MD / 15,; 7,487" TVD ADT 8.01 hrs, ECD 9.99 ppg, 260 gpm, 3020 psi, P/U wt 221 k, SO wt 119 k, ROT wt 159 k, 160 rpm, 13/10 k ft/lbs trq, 5-18 WOB. Pumped 3 Lo/Hi Vis anti jamming sweeps to free up lower torquer on power drive. DRILL DDRL P Drill ahead f/ 16,377' to 16,821' MD / 16, 7,490" TVD ADT 3.02 hrs, 260 gpm, 3300 psi, 9.98 ECD, P/U wt 230 k, SO wt 120k, ROT wt 155 k, 160 rpm, 14/12 k ft/lbs trq, 5-18 WOB. Stopped Drilling due to anti -collision issue with original CD5-99 Intermediate section after survey corrections. DRILL CIRC T Circulated w/ 260-270 gpm, 2940 psi, 16 140-120 rpm, 10-10.5k Tq. Consult town on plan forward after anti - collision risk identified. DRILL CIRC T SPR's 16 I IN 01 15,1 f But .01 16,821 ,821.0 11/7/2U1ti i unculu 07:45 08:00 Repor Printed: ,758.0 Rig: DOYON 19 Time Log 11/7/2 10:00 10:30 Start Time End Time Dur (hr) Phase 11/7/2016 11/7/2016 0.50 PROD2 08:00 08:30 wear. ECD's decreased from 9.7 to 9.4 ppg. Influx of well bore fluids suspected with lower ECD's. Cont. to 11/7/2016 11/7/2016 1.50 rROD2 08:30 10:00 T Strip OOH f, 16,758' to 16,567' MD w/ 16,7: 11/7/2016 11/7/2 10:00 10:30 11/712016 11 /7/2 10:30 10:45 11/7/2016 11 /7/: 10:45 14:15 11 /7/2016 1117/2016 14:15 14:45 11 /7/2016 11 /7/2016 14:45 16:00 11 /7/2016 11 /8/2016 16:00 00:00 11/8/2016 11 /8/2 00:00 10:30 00:00 06:30 11 /8/2016 11/8/: 10:30 12:OC 11/812016 111 /9/2 12:00 00:00 x.50 0.25 3.50 0.50 1.25 8.00 Operations Summary (with Timelog Depths) CD5-99 Code LL RILL DR LL X DRI KB) End Depth (ftKB) Job: DRILLING ORIGINAL Start Depth Code Time P -T -X Operation T Continue circulating while consulting 11 /9/2016 111/9/2016 00:00 06:30 T Start holding 180 psi back pressure Ti /9/2016 T119/2016 circulating, 260 gpm, 2940 psi. 06:30 07:15 x.50 0.25 3.50 0.50 1.25 8.00 Operations Summary (with Timelog Depths) CD5-99 Code LL RILL DR LL X DRI KB) End Depth (ftKB) Job: DRILLING ORIGINAL Start Depth Code Time P -T -X Operation T Continue circulating while consulting (ft 16,75 town on plan forward w/270 - 260 gpm, 3040 - 2940 psi. T Start holding 180 psi back pressure 16,7E while circulating, 260 gpm, 2940 psi. Did not rotate due aid in DP & BHA wear. ECD's decreased from 9.7 to 9.4 ppg. Influx of well bore fluids suspected with lower ECD's. Cont. to consult with town. Decision made to POOH to shoe and monitor well for flow. T Strip OOH f, 16,758' to 16,567' MD w/ 16,7: 260 gpm, 2980 psi, holding 108/400 psi BP on/out of slips. T Attempt to SOOH f/ 16,567' to 16,377' 16,5 MD, 400/500 psi BP in/out of slips. Floats did not hold. T Pump OOH f/ 16,377' to 15,044' MD 16,3 w/ 260 gpm, 2790 psi holding 180/400 psi BP in/out of slips. Rotated 20 rpm 9-10k TQ to clear top of BHA through window. Observed 15k overpull with bit entering window. T Rig up for FIT/fingerprint and B/D TD. 15,( T OH FIT —t,—, 1-5 ppg EMW with 8.8 ppg 15,( and 1035 psi back pressure. pressure held. = T Performed fingerprint, drawing down 3 15,1 times. Bleed pressure to 429 psi (1 bbl) and built back to 448 psi in 16 min. Bleed back down to 359 psi (1 bbl) and built back up to 439 psi in 90 min. Bleed down to 0 psi (2.5bbl) and build back up to 400 psi in 5.5 hr as of midnight. F T Cont. to monitor pressure increase 15, f/401 psi to 579 psi. (Decision made to increase mud wt from 8.8 ppg to 10.8 ppg) q T Fill chokes. Equalize pressure on 15 choke manifold. R/D circ swedge & M/U top drive. Equalize pressures. Stage up on mud pumps to 6 bpm & equalize pressures thru MPD equipment. Open top pipe rams & circulate thru MPD chokes. T Wt up from 8.8 ppg to 10.3 ppg bpm @ .3 ppg increments. Holding back pressure to maintain ECD's @ 10.5 ppg until 9.7 ppg in/out, then chokes 100% open. Rotating 60 rpm @ 8 k ft/lbs torque. As of midnight 10.3 ppg In & 10.0 ppg Out T Wt up from 10.3 ppg to 10.5 ppg w/6 1 `• J bpm, 3210 - 3260 psi, 60 rpm, 8 k trq FF T OWFF. Close MPD chokes &monitor 1• psi for 10 min = 0 psi increase. Open chokes & monitor returns in cellar for 30 min (static) Rannr .0 .0 6, 4 0 .0 ,044.0 15, 1 y t tT Timelog Depths) Operations Summary (with CD5-99 .. , Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log ActiviryCode dime P -T -X Wt 5 Operation u from 10.5 ppg to 10.8 ppg w/6 - bpm, 3050 - 2120 psi, 60 - 30 rpm, 8 Start Depth (ftKB) End 15,044.0 Depth (MEI)Start 15,044.0 Time 11/9/2016 11/9/2016 End Time Dur(hr) 3.75 PROD2 Phase DRILL Op Code CIRC 07:15 11:00 k trq T psivF chokes & O psi increase.F. li ose e. Open chokest& r 15,044.0 15,044.0 11/9/2016 11/9/2016 -0 25 PROD2 DRILL OWFF 11:00 11:15 monitor returns in cellar (static) 11/9/2016 11/9/2016 0.25 PROD2 DRILL CIRC T SPR's 15,044.0 --T5-,044.0 11:15 11:30 11/9/2016 11/9/2016 3.25 PROD2 DRILL REAM T 15,186' W ash in hole w!2 bpm f/15,044' to --1-5,-044.0 (tight hole @ 15,186') W&R 15,901. 11:30 14:45 f/15,186' to 15,901'w/4.6 bpm, 1850 11/9/2016 11/9/2016 1.00 PROD2 DRILL SMPD T psi, 50 rpm, 7.5 - 9 k trq RI on elevators f/15,901' to TD of 16,821' 15,901.0 16,821.0 14:45 11/9/2016 15:45 11/9/2016 3.25 PROD2 DRILL CIRC T Nt w/4.5 bpm13-1 , 2340 psup i, rpmpg 16,821.0 16,821.0 15:45 19:00 7.5 - 9 k trq. Maintain ECD's <11.6 ppg.SPR's. Lightest mud seen = 9.5 ppg, max gas = 602 units --T5-,044.0 PMPO T bpm, 20200 psi (Dropped 20114 hollow drift) ---f-6,821.0 ----i-5,044.0 11/9/2016 19:00 11/9/2016 2230 3.50 PROD2 DRILL -5-W--T- T (sat ) SIMOPSf- PJSm oeturns in n RCD bearing 15,044.0 11/9/2016 22:30 11/9/2016 23:00 0.50 PROD2 DRILL MPDA T Pull RCD bearing &install trip nipple 15,044.0 15,044.0 11/9/2016 -f-1 /10/2-016 -1 00 PROD2 DRILL 23:00 00:00 PMPO T p OOH f/15,044' to 7,911' w/3 4 bpm 15,044.0 7,911.0 -7,911 11/10/2016 00:00 1 1/10/2016 09:157,911.0 9.25 PROD2 DRILL -(5W-FF T F/C(Slightdrop) 0 11 /10/2016 11/10/2016 0.25 PROD2 DRILL 09:15 09:30 PMPO T Pump OOH f/7,911'to 1,809' w/4 bpm 7,911.0 1,809.0 -TI/10/2016 11/10/2016 8.00 15ROD2 DRILL 09:30 17:30 -LL TRIP T POOH on elevators f/1 ,809 to 308 1,809.0 308. 11/10/2016 11/10/2016 2.00 PROD2 -5-RI 17:30 19:30 OWFF T FIC (Static) SIMOPS PJSM on BHA 308.0 308.0 11/10/2016 11/10/2016 0.50 PROD2 DRILL 19:30 20:00 BHAH T (Rack back 1 stand HWDP & Jars) 308.0 0 11/10/2016 11/10/2016 2.00 PROD2 DRILL 20:00 11/10/2016 22:00 11/10/2016 0.25 PROD2 DRILL BHAH T Clean &clear floor 0.0 0.0 22:00 11/10/2016 22:15 22:15 11/10/2016 23:15 1.00 PROD2 DRILL BOPE T est pperl wear ring & set p pe rams. plug. R/U to 0 0 0 BOPE T HCR Bchh choke &OP 1kils4" FOSV, Choket joint. Upper s 0.0 0.0 11/10/2016 11/11/2016 0.75 PROD2 DRILL 23:15 00:00 valves 1,35,& 6 to 250/3500 psi for 5 min (good). Draw down on super choke to 1100 psi. 11/11/2016 11/11/2016 1.00 PROD2 DRILL BOPE T uipmen . g/D lines. RMC set 7g1 equipment. wear 0.0 0.0 00:00 11/11/2016 01:00 11/11/2016 1.50 PROD2 DRILL RURD T ngs &14 1/2" ellevators. Organize ECP 0'0 0.0 01:00 02:30 running order in pipe shed. PUTS TM/U ECP packer as per baker rep to 313' (3 B keryECP 0.0 313.0 11/11/2016 11/11/2016 -1 50 PROD2 DRILL 02:30 04:00 packers & 2 TM swell packers) 11/11/2016 11/11/2016 0.25 PROD2 DRILL RURD T CIO elevators DP elevators. 313.0 313.0 04:00 04:15 Paae 56173 Report Printed: 12/1/2011 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Op Code Activity Code RUNL TimeP-T-X T Operation RIH w/1 stand 4" DP to 404' Start Depth (ftKB) 313.0 End Depth (ftKB) 404.0 Start Time 11/11/2016 11/11/2016 End Time Dur(hr) 0.25 PROD2 Phase DRILL 04:15 04:30 11/11/2016 11/11/2016 0.25 PROD2 DRILL CIRC T bpm @x100 psi, 4 bpm @ 140 psi rculation 2 bpm @ 80 psi, 3 404.0 404.0 04:30 04:45 11/11/2016 11/11/2016 18.25 PROD2 DRILL RUNL T RIH 79 (no issues running pacP packer askers 404.0 15,779. 04:45 23:00 thru window) Torque & drag data TOW @ 15,049' PU wt 210 k / SO wt 130 k 11/11/2016 11!11/2016 0.25 PROD2 DRILL RUNL T Drop 1.25" ball & RIH f/15,779' to 15,797' 15,779.0 15,797.0 23:00 11/11/2016 23:15 11/12/2016 0.75 PROD2 DRILL CIRC T Pump down ball w/1.7 bpm @ 620 psi 15,797.0 15,797. 23:15 11/12/2016 00:00 11/12/2016 0.75 PR0D2 DRILL CIRC T Pump down ball wl1.7 bpm @ 610 psi. 1300 stks reduce flow rate to 1 bpm @ 15,797.0 15,797. 00:00 00:45 490 psi. Ball on seat 1373 stks (calculated 1661 stks). Pressure up to 600 psi. Pressure will not hold. Pressure up to 650 psi pressure not holding. Turn over to Dowell. Dowell flood lines & pressure test to 15,797.0 15,797.0 DRILL PACK T 4000 psi (good). Made 5 attempts 11/12/2016 11/12/2016 0.75 PROD2 00:45 01:30 increasing pressure from 800 to 850 psi to attempt to shift WIV closed. Pressure will not hold. Suspect ball not sealing fully. WIV not shifting closed. 11/12/2016 11/12/2016 0.75 PROD2 DRILL WAIT T Conslt with Baker reps onoplandrilling rward team & 15,797.0 15,797.0 . 01:30 11/12/2016 02:15 11/12/2016 2.75fo PROD2 5 more times with Dow 15,797.0 15,797.0 DRILL PACK T ottempt set WIV• Pressure up to 950 psi 02:15 02:15 05:00 max. No success. Consult with town. Work drill string. PU wt 225 k / SO wt 130 k. Make 2 more attempts with Dowell. No success. ( 13 total attempts to close WIV) Establish circ rate with Dowell 0.3 bpm @ 377 psi. Decision made to drop 2nd ball 1.5" own-wth .7 DRILL CIRC T D�obp2p @ 650 psi Calcudlated strrokes 15,797.0 15,797.0 to bump 1661 stks. Balt did not appear to seat. Work drill string every hour. 11/12/2016 05:00 11/12/2016 09:15 4.25 PROD2 Cont to consult with town on plan forward. Continuously change parameters to get ball to seat. At 2302 stks observed pressure increase w/1 bpm from 550 psi to 720 psi. Ball appear to be seated. More differential but still not holding pressure. 11/12/2016 11!12/2016 0.25 PROD2 DRILL PACK T 1460 psi & bserve WIV shift closed Increase pumrate to pressure up to15,797.0 15,797.0 09:15 09:30 Shut down pump immediately, 1590 psi & observe ECP packer # 1 inflate. Pressure stabilize @ 1210 psi. Bleed off pressure & turn over to Dowell. Page 57173 Report Printed: 12/11201E Operations Summary (with Timelog Depths) M Job: DRILLING ORIGINAL Time P -T -X CD5 Start Depth (ftKB) End 15,797.0 Depth (flKB) 15,500.0 Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code 11/12/2016 11/12/2016 psi & let pressure stabilize. Increase 2.00 PROD2 DRILL PACK pressure to 1850 & inflate ECP #2. 09:30 11:30 Bleed back to 400 psi & gain 1.25 bbl 11/12/2016 11/12/2016 3.00 PROD2 DRILL CIRC 11:30 14:30 to 1800 psi & could not confirm shear 11/12/2016 11/12/2016 1.00 PROD2 DRILL PMPO 14:30 15:30 packers set all pressure bled off to 11/12/2016 zero to close valve in packers. 11/12/2016 0.75 1ROD2 DRILL MPDA 15:30 16:15 ECP's 11/12/2016 11/12/2016 4.00 PROD2 DRILL CIRC 16:15 20:15 mud wt out 10.3 ppg & max mud wt 11/12/2016 11/12/2016 2.00 PROD2 DRILL OWFF Pump OOH w/4 bpm f/15,500' to 20:15 22:15 15,038.0 15,038' 11/12/2016 11/12/2016 0.25 PROD2 DRILL OWFF 22:15 22:30 11/12/2016 11/13/2016 1.50 PROD2 DRILL OWFF 22:30 00:00 11/13/2016 11/13/2016 0.50 PROD2 DRILL MPDA 00:00 00:30 11/13/2016 11/13/2016 0.50 PROD2 DRILL SMPD 00:30 01:00 11/13/2016 11/13/2016 4.00 PROD2 DRILL CIRC 01:00 05:00 Paae M Job: DRILLING ORIGINAL Time P -T -X Operation Start Depth (ftKB) End 15,797.0 Depth (flKB) 15,500.0 T Dowell inflate ECP packers as per Baker rep. Dowell pressure up to 500 psi & let pressure stabilize. Increase pressure to 1850 & inflate ECP #2. Bleed back to 400 psi & gain 1.25 bbl fluid. Dowell increase pressure to 2000 psi & inflate ECP #3. Bled back to 1800 psi & could not confirm shear or packer inflating. Increase pressure to 2400 psi. & packer set. Once packers set all pressure bled off to zero to close valve in packers. Increase pressure to 3020 psi to hydraulic disconnect & release from ECP's T Circ & cond mud to 10.8 ppg with 3 - 15,500.0 15,500.0 4.5 bpm, 940 - 1440 psi. Minimum mud wt out 10.3 ppg & max mud wt out 12.2 ppg. T Pump OOH w/4 bpm f/15,500' to 15,500.0 15,038.0 15,038' „ . _ _.__,_ o :..,.i..n or�n ae Fis—ot 15.038.( bearing. Circulate & cut mud wt from 10.8 ppg to 8.8 ppg as per back pressure schedule. 230 - 290 gpm, 1680 - 2460 psi Perform negative pressure test. Shut down pumps & trap 500 psi. Let pressure stabilize. Bleed off pressure to 285 psi (.75 bbls gain in TT) Monitor pressure for 5 min Pressure decrease from 285 to 281 psi. Open chokes and bleed off pressure to zero. (4 bbls gain in TT for 4.75 bbls total) @ 20:30 hrs shut in chokes & monitor psi. Pressure increasing: 20:30 = 5 psi 20:45 = 63 psi 21:00 = 132 psi 21:15 = 193 psi 21:30 = 219 psi 21:45 = 241 psi 22:00 = 255 psi 22:30 = 275 psi 15.038.0 15,038.0 Perform breathing test. Open up 15,038.0 l chokes & bleed off pressure for 10 min. Gained lbbl Shut in chokes and monitor psi. 15,038.0 1 22:51 = 6 psi initial 23:21 = 129 psi 30 min 23:51 = 231 psi 1 hr (Decsion made to RIH to TD of 15,500' and wt up to 10.8 ppg) T Line up MPD equipment to strip in 15, hole pressure f/15,038' to 15,481' Circ & wt up f/8.8 ppg to 10.8 ppg as 15,481.0 1 per back pressure schedule w/290 - 250 gpm. 58173 Report Printed: 12/1/2016 $t` Operations Summary (with Timelog Depths) ...• ..,,... -_ -- 00:45 01:30 T Pump OOH w/5 bpm f/2,244'to 1,773'. 1,773.0 1,773.0 11/14!2016 11/14/2016 0.75 COMPZ2 FI CD5-99 01:30 02:15 DHEQ T 11/14/2016 11/14/2016 0.25 Job: DRILLING ORIGINAL Rig: DOYON 19 1190 psi. No good. 11/14/2016 11/14/2016 Time Log COMPZ2 FI 02:30 04:00 Start Depth (ftKB) End Depth (ftKB) Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X T Operation Pum OOH w/5 bpm f/15,481' to p 15,481.0 15,038.0 11/13/2016 11/13/2016 1.25 PROD2 DRILL PMPO COMPZ2 FI 15,038' 04:15 05:00 05:00 06:15 SH 11/14/2016 OWFF T F/C (static) 15,038.0 15,038.0 11/13/2016 11/13/2016 0.50 PROD2 DRILL 11/14/2016 11/14/2016 13.00 COMPZ2 FI TRIP 06:15 06:45 1,770.0 14,910.0 PMPO T OOH w/5 bpm f/15,038' to 15,038.0 14,562.0 11/13/2016 11/13/2016 0.75 PROD2 DRILL CIRC P 14,562' 11/14/2016 1.00 06:45 07:30 21:00 22:00 CIRC T Circ &cond mud to aid in preventing 14,562.0 14,562.0 11/13/2016 11/13/2016 1.00 PROD2 DRILL 22:45 sag w/5.5 bpm @ 1640 psi. SLPC 11/14/2016 07:30 08:30 COMPZ2 F SMPD T P 14,562.0 1,047.0 11/13/2016 11/13/2016 10.50 PROD2 DRILL P 23:00 f/14,5G2' oa1,047MPDschedule 14,910.0 08:30 19:00 bearing. OWFF T F/C (static) SIMOPS -PJSM on 1,047.0 1,047.0 11/13/2016 11/13/2016 0.25 PROD2 DRILL pulling RCD bearing. bearing. 19:00 19:15 T Pull RCD bearing &install trip nipple. 1,047.0 1,047.0 11!13!2016 11/13!2016 0.75 PROD2 DRILL MPDA 19:15 20:001,047.0 TRIP T POOHf/1047'to16' 16.0 11/13/2016 11/13/2016 0.50 PROD2 DRILL 20:00 20:30 BHAH T abilizer & Baker hydraulic 16.0 0.0 11/13/2016 11/13/2016 0.50 PROD2 DRILL relDeaseBool. 20:30 21:000. FISH BHAH P Clean &clear floor. Bring Baker 0.0 11/13/2016 11/13!2016 1.00 COMPZ2 whipstock retrieval tools to rig floor. 21:00 22:00 P Baker whipstock retrieval BHA to 0.0 365.0 11!13/2016 11/13/2016 1.50 COMPZ2 FISH BHAH 365' 22:00 23:30365.0 TRIP P RIH f/365' to 1,208' 1,208.0 11/13/2016 11/14/2016 0.50 COMPZ2 FISH 23:30 00:001,208.0 TRIP FT- RIH f/1,208' to 2,244' 2,244.0 11/1412016 11/14/2016 0.75 COMI FISH 00:00 00:45 �Icu nHFO P Shallow hole test MWD w/230 gpm 2,244.0 2,244.0 1190 psi. No good. Cycle pumps several times in an attempt for good test. No success. Decision made to FISH 111141ZU10 I I/ 1•14U iU ...• ..,,... -_ -- 00:45 01:30 T Pump OOH w/5 bpm f/2,244'to 1,773'. 1,773.0 1,773.0 11/14!2016 11/14/2016 0.75 COMPZ2 FI MWD starting to show life. 01:30 02:15 DHEQ T 11/14/2016 11/14/2016 0.25 COMPZ2 FI 02:15 02:30 1190 psi. No good. 11/14/2016 11/14/2016 1.50 COMPZ2 FI 02:30 04:00 75' 11/14/2016 11114/2016 0.25 COMPZ2 FI 75.0 75.0 04:00 04:15 re -program. Inspect MWD for debris. 11/14/2016 11/14/2016 0.75 COMPZ2 FI T 04:15 05:00 1,770.0 SH 11/14/2016 11/14/2016 0.50 COMPZ2 FI 1,770.0 05:00 05:30 1450 psi. (good) 11/14/2016 11/14/2016 13.00 COMPZ2 FI TRIP 05:30 18:30 1,770.0 14,910.0 11/14/2016 11/14/2016 2.50 COMPZ2 FI 18:30 21:00 SH CIRC P 11/14/2016 11/14/2016 1.00 COMPZ2 F 21:00 22:00 2740 psi. Minimum mud wt out 10.3 11/14/2016 11/14/2016 0.75 COMPZ2 F ppg & Man mud wt out 11.6 ppg. 22:00 22:45 ISH SLPC 11/14/2016 11/14/2016 0.25 COMPZ2 F 22:45 23:00 P Service rig & calibrate block height 14,910.0 11/14/2016 11/14/2016 0.75 COMPZ2 P 23:00 23:45 14,910.0 1190 psi. No good. Cycle pumps several times in an attempt for good test. No success. Decision made to FISH POOH to trouble shoot MWD PMPO T Pump OOH w/5 bpm f/2,244'to 1,773'. 1,773.0 1,773.0 SH MWD starting to show life. DHEQ T Shallow hole test MWD w/230 gpm 1,773.0 1,773.0 SH 1190 psi. No good. SH TRIP T POOH on elevators on TT f/1 ,773 to 1,773.0 75.0 75' SH DHEQ T Trouble shoot MWD tool. Plug in and 75.0 75.0 re -program. Inspect MWD for debris. SH TRIP T RIH f/75'to1,770' 75.0 1,770.0 SH DHEQ T Shallow hole test MWD w/251 gpm 1,770.0 1,770.0 1450 psi. (good) SH TRIP P RIH f/1,770 to 14,910' (fill pipe every 1,770.0 14,910.0 20 stds) SH CIRC P Circ & cond 10.8 ppg mud w/230 gpm, 14,910.0 14,910.0 2740 psi. Minimum mud wt out 10.3 ppg & Man mud wt out 11.6 ppg. ISH SLPC P Slip & cut 83' drill line. 14,910.0 14,910.0 ISH SVRG P Service rig & calibrate block height 14,910.0 14,910.0 ISH -6 -W P F/C (static). SIMOPS - PJSM on RCD 14,910.0 14,910.0 bearing. MP -DA P Remove trip nipple & install RC D 14,910.0 14,910.0 bearing. 12/1/2016 Rig: DOYON 19 Time Log 11/15/2016 04:15 0.25 11 /15/2016 Start Time End Time our (hr) Phase 11/14/2016 11/15/2016 0.25 COMPZ2 23:45 00:00 15, 006.0 P 650 psi. Orient and line Dup tool ace 11/15/2016 11/15/2016 11/15/2016 1.00 C0MPZ2 00:00 01:00 P Wash down to 15,133' MD, 230-260 15,101.0 gpm, 2760-3130 psi. P/U=210k, :ISH WASH 11/15/2016 11/15/2016 0.75 COMPZ2 01:00 01:45 FISH FISH P Line up tool face to 24L and hook 15,121.0 whipstock assy with 8k down @ 15121' MD. P/U 250k to confirm 11/15/2016 11/15/2016 0.50 60MPZ2 01:45 02:15 observe drag, pulling up hole. S/O to 115k and observe 2' higher in hole. 11/15/2016 11/15/2016 0.75 COMPZ2 02:15 03:00 FISH 7::::F Pump out from 15,231' MD to 15,180' 15,231.0 MD, 200 gpm, 1730 psi. 11/15/2016 11/15/2016 1.00 COMPZ. 03:00 04:00 pressure pulling and 40-20 psi in slips. P/U= 148k @ 8,111' MD. *No slack off 11/15/2016 04:00 11/15/2016 04:15 0.25 11 /15/2016 11 /15/2016 1.00 04:15 05:15 P 11/15/2016 11/15/2016 6.75 05:15 12:00 15, 006.0 P 650 psi. Orient and line Dup tool ace 11/15/2016 12:00 11/15/2016 19:45 r•10 11/15/2016 11/15/2016 0.25 19:45 20:00 P 11/15/2016 11/15/2016 0.75 20:00 20:45 15, 006.0 P 650 psi. Orient and line Dup tool ace 11/15/2016 11/15/2016 0.75 120:45 21:30 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth (ftKB) End Depth MKS) Op Code Activity Code Time P P -T -X up ration Wash in hole w/230 gpm @ 2660 psi. 14,910.0 WASH Wash down from 14,928' MD to 14,928.0 15,006' MD @ 230 gpm, 2650 psi. Locate RA tag @ 14,947' MD bit WASH P ;SH depth. 15, 006.0 P 650 psi. Orient and line Dup tool ace WASH to wash slide 160R. P Wash down to 15,133' MD, 230-260 15,101.0 gpm, 2760-3130 psi. P/U=210k, :ISH WASH S/0=125k. FISH FISH P Line up tool face 10L and attempt to 15,133.0 hook whipstock assy. Tool face walked to 1 OR. FISH FISH P Line up tool face to 24L and hook 15,121.0 whipstock assy with 8k down @ 15121' MD. P/U 250k to confirm whipstock is hooked. Bleed jars and P/U to 265k, S/O to 115k to cock jars. P/U 275k and fire jars, P/U to 300k. S/O again to 115k to cock, P/U to 300k and fire. P/U to 325k and observe drag, pulling up hole. S/O to 115k and observe 2' higher in hole. Repeat jar action and P/U 310k and observe movement. After 5 jars cycles, confirm fish engaged, P/U 225k, 260-200 gpm, 2860-1730 psi. Pull up to 15,231' MD. FISH 7::::F Pump out from 15,231' MD to 15,180' 15,231.0 MD, 200 gpm, 1730 psi. FISH OWFF 7 OWFF. Line up, shut in and monitor 15,180.0 pressure on MPD chokes. 0 psi. Line up and pump across top of hole via MPD, observe 3 bph static loss rate. FISH SMPD MIDD 15,180.0 P 15'1180' MD to18,11 V MD perry stripping schedule. Holding 190-150 psi annular pressure pulling and 40-20 psi in slips. P/U= 148k @ 8,111' MD. *No slack off while pulling whipstock.' OA pressure @ 11:00 hrs= 230 psi. P =-" =dMnt with in th psi from 8,111.0 FISH SMPD OWFF P Shut down pump, line up MPD to flow 566.0 static. S FISH Blow down top drive. MPDA P Remove RCD element and install trip 566.( nipple per MPD rep. FISH FISH TRIP P Trip out from 566' MD to 201' MD to 566.( whipstock hook assy. 15, I ,133.0 .121.0 15,180.0 15,180.0 E 0 Rig: DOYON 19 Time Log Start Time End Time Dur (hr) IP ase 11/15/2016 11/16/2016 2.50 COMPZ2 21:30 00:00 11/16/2016 11/16/2016 1.uu 00:00 01:00 11/16/2016 11/16/2016 1.75 01:00 02:45 11/1612016 111/16120161.50 1.50 02:45 04:15 11/16/2016 111/1 & 04:15 12:00 11/16/2016 111/16, 12:00 17:30 11/16/2016 111/16 17:30 19:30 11 /16/2016 111/16/2016 19:30 20:00 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGI Start Depth MkR1 I End Depl Code Activity Code Time P P -T -X PJSM uperauun and lay down whipstock BHAH retrieval hook assy (observed wash nozzle missing from hook), whipstock BHA assy to locator sub. Calc Disp=87 bbl, Actual Disp=127 bbl. OA pressure @ 22:00 hrs=120 psi. No damage to whipstock assy, observed some sag material below debris cup to locator assy. BHAH P Clean and clear rig floor, lay down whipstock and tools via beaverslide. BHAH P PIU cleanout assembly BHA PR components via beaverslide. Lay down 1 stand NM flex collars, lay down jar stand, (Jars and HWDP) via mousehole. Change out elevators from 4" to 3%" for EUE mule shoe. BHAH P PJSM, M/U Baker cleanout assembly LPR per BOT fishing rep to 373' MD. Static loss rate 1 bph. TRIP P RIH with cleanout assembly from 373' LPR MD to 10,373' MD, flilling pipe every 20 stands. P/U=157k, S/0=120k @ 10,373'. Note- String took 30k down weight @ 4085'. Picked up and wiped, P/U=105k, S/0=100k nothing there. Suspect nozzle from retrieval hook hung up on locator. Did not see it again. OA pressure @ 11:00 hrs=40 psi. TRIP P Continue RIH with cleanout assy from _LPR 10,373' MD to 15,110' MD, filling pipe every 20 stands. REAM P Obtain P/U=210k, S/0=130k. Wash -LPR down @ 4 bpm 1160 psi from 15,110' MD to 15,188' MD observe 5k drag. Mills past window @ 15,188' MD, appears to be material piling up below locator. PIU to 15,133' MD, 20 rpm 7.5k Tq, ROT=157k. Increase pump rate to 6 bpm 2300 psi, ream down to 15,195' MD, briefly observe 3-10k reduction in string weight and 2-3k increase in torque and mills pass window. Back ream to 15,135' MD, S/D rotary and drift down to 15,195' no issues, then appear to be pushing fill. Continue washing down to 15,205' MD to make connection, string weight returning to 135k. WASH P Wash down from 15,205' MD @ 2 :CCPR bpm, 630 psi to 15,265' MD mule shoe depth. No-go @ 15,229' with 5k, PIU and verify with 10k down weight. rage E 0 0. 5.110.01 1 0 [IX1] 0 /201E Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase 11/16/2016 11/16/2016 3.50 COMPZ2 20:00 23:30 11/16/2016 111/17/20160 0 23:30 00:00 11 /17/2016 11111712016 00:00 02:00 TI -11 7/2016 111 /17 02:00 03:15 1-1/17/2016 111 /17, 03:15 03:45 11/17/2016 111/17/2, 03:45 04:15 11 /17/2016 11/17/2 04:15 04:30 11 /17/2016 1-1/1 —7/2 04:30 12:45 11/17/2016 111/11 12:45 13:00 00 Operations Summary (with Timelog Depths) GD5-99 Code COMPZ2 1WELLPR Job: DRILLING ORIGINAL Start Depth ftK8 End Depth (itKB) vity Code Time p P -T -X P/U Operation to 15,255' MD and circulate ( ) 15,26 bottoms up 250 gpm, 2150 psi. Pump Hi Vis sweep around and prepare for brine displacement. Observe shakers for junk while pumping, no junk observed. Reciprocate pipe 20' every 10 minutes, keeping 3'/i' mule shoe inside SBE. Pumped total 2.5 bottoms up, lightest 11,600 stks. Observe some sag, mud out 10.4 ppg, heaviest 11.6 ppg. OA pressure @ 23:00 hrs=100 psi D p PJSM and begin displacement from 15,2: 10.8 ppg MOBM to 10.8 ppg NaCl/Naar brine. Pumped 40 bbl Hi Vis lead spacer from pill pit, 65 bbl 10.8 ppg transition spacer from truck, 6 bpm 2150 psi. P P Continue displacing well to 10.8 ppg 15,2 NaCl/Naar brine, pump 30 bbl tail spacer #3, followed by 635 bbl 10.8 ppg brine @ 5.8 bpm, 1430 psi. Track volume pumped vs volume returned throughout displacement, lost 15 bbl during displacement. Lead spacer interface showed up 100 bbl early and was very strung out due to no pipe rotation. No surface issues with handling interface mixture. Reciprocate pipe 20' every 10 minutes keeping mule shoe in SBE. IH P Pump@53 3 corrosion bited 11120 15,: brine 6 bpm, displace with bbl neat 10.8 ppg brine, clean brine returns to pits while pumping inhibitor. Racked back (pumped out) two stands to 15,110' during displacement to get locator assy above window. P/U=220k, S/O=125k. Blow down top drive. NFF P Flow check well for 30 minutes, static. 15, No drop or rise. SIMOPS- Clean out under shakers and troughs. PJSM on pulling trip nipple and installing RCD. PDA P Pull trip nipple and install RCD bearing 15 assy. IRC P Obtain new SPR's with 10.8 ppg brine 15 and bearing installed, blow down top drive. MPD P Strip out of hole with MPD from 15 15,110' MD to 8,490' MD holding 120 psi AP pulling and 20 psi in slips. Good fill. P/U=165k, S/0=110k. )WFF P Shut down pump and flow check well, static. Page 52/73 oe. ;T E I 01 15,11 W file /201 Operations Summary (with Timelog Depths) .;. CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Activity Code Time P P -T -X Co�in-ue from Operation strip out of hole with 8 490' MD to 930' MD holding Star/ Depth (ftKB) End 8,490.0 Depth (ftKB) 930.0 Start Time 11/17/2016 11/17/2016 End Time Dur (hr) 7.75 COMPZ2 Phase Op Cade WELLPR SMPD 13:00 20:45 120 psi AP pulling and 20 psi in slips. Good fill. OWFF P Shut minutes stump and flow check well 930.0 930.0 11/17/2016 11/17/2016 0.25 COMPZ2 WELLPR 20:45 21:00 11/17/2016 11/17/2016 1.00 COMPZ2 WELLPR MPDA P and with blowush dow P Remove RCDwater 930.0 930.0 21:00 22:00 element and install trip nipple. 11/17/2016 22:00 11/17/2016 2245 0.75 COMPZ2 WELLPR PULL) P a00gdown 43DP.D to 464' MD OA pressure @ 22:00 hrs=50 psi 930.0 464.0 BHAFi P HWDP, Baker COO out BHA to 65' 464.0 65.0 11/17/2016 11/18/2016 1.25 COMPZ2 WELLPR 22:45 00:00 MD. Lay down 31/2' EUE mule shoe joint in mouse hole. Calc Disp=88.4 bbl, Actual Disp=108 bbl. SVRG P Service rig, top drive, draw works.. 65.0 65.0 11/18/2016 11/18/2016 0.50 COMPZ2 WELLPR 00:00 11118!2016 00:30 11/18/2016 00:30 11/18!2016 01:30p.0 11/18/2016 1.00 2.00 COMPZ2 COMPZ2 WELLPR WELLPR BHAH WWWH P P PJSM and lay down remaining BHA #13 per Baker rep. 2 joints. M/U stack washer and XT39n 65.0 0• 0.0 01:30 03:30 BOT string magnet to flush stack. Flush stack with 12-15 bpm, 70 psi, 20 rpm. Pull and clean magnet (25% loaded), lay down stack wash assembly. Blow down top drive and mud line. SIMOPS- Pull 90' mousehole for modification. RURD P Pull estjo nt Fill stackset , choke/killest plug iline and 0.0 0.0 11/18/2016 11/18/2016 1.50 COMPZ2 WHDBOP 03:30 05:00 choke manifold. Rig up to test. BOPE P Test BOPE AOGCC Matt iHerrera witneissed test. 0.0 0.0 11/18/2016 11/18/2016 4.00 COMPZ2 WHDBOP 05:00 09:00 Tested annular, UPR, LPR, choke manifold valves #1-14, needle valve above #1, 4" Demco kill, Auto and manual IBOP, 4" FOSV and Dart, HCR choke and kill, Manual choke and kill on stack. Performed all tests to 250/3500 psi 5 min each charted. (annular to 250/2500 psi). Electrician tested gas alarms and PVT alarms. 11/18/2016 11!18/2016 1.75 COMPZ2 t 250/2500 psiChange to 31/2" , UPRest iand LPR tont, test annular 0.0 0.0 09:00 10:45 =HDBPBOPEP 250/3500 psi. Back out landing joint. P r test. System p ess ePerform a3000 psi,Pressureafter closing=1500 psi, 200 psi attained=25 .0 0.0 11/18/201611/18/2016 10:45 11:00 025 COMPZ2 WHDBOP sec, full system recovery=143 sec. 4 bottle N2 average=2050 psi. 11/18/2016 11/18/2016 0.75 COMPZ2 WHDBOP BOPE P updrams er autto3ch0oke to 1100 0 psi. Test manual Testinand d am 0 0 0.0 11:00 11:45 psi Faae 63173 Report Printed: 12111201E Start Time 11 /18/201 E 11:45 11/18 12:30 Rig: DOYON 19 End Time Dur (hr) Phase 11/18/2016 0.75 COMPZ2 12:30 14:30 11 /18/2016 11 /18/2016 I 3.50 14:30 18:00 11/18/2016 11 /1 bizu l b 18:00 19:00 11/18/2016 11/19/2016 19:00 00:00 11 /19/2016 111/1912016 00:00 12:00 T-1/1 —9/20-1611/19/2016 I 9.50 12:00 21:30 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGIN Op Code Activity Code Time P -T -X Blow Operation down choke manifold, choke and Start Depth (ftKB) End 0.0 Depth DROP RURD P kill lines. Rig down test equipment. Pull test plug, lay down test joint. COMPZ2 RPCOMP PUTB ntinue picking up and running 3'/z'14,4 # L-80 EUE 8rd Mod, securing Install 9" ID retrievable wear ring per TEC wire with 1 Cannon clamp over FMC. each coupling. Run completion from OA pressure @ 12:00 hrs=75 psi displacement, <1bph losses. COMP RURD P Clear rigfloor, la down tools. P/U 0.0 tubing running tools, SLB tool box, TEC line spool, hang sheave. Install mousehole and PIU cannon clamps. COMP PUTB P PJSM on running completion. PIU 0.0 WLEG, locator assy, X nipple, HES TNT packer, 16 jts 3'/" TN 110, X nipple, HES TNT packer, XO to EUE- 8rd, P/U SLB gauge carrier per detail to 737' MD. COMP OTHR P SLB connect TEC wire to guage 737.0 carrier @ 737' MD and test connection to 5000 psi. 'COMP PUTB P Continue picking up and running 3'/V 737.0 3, 9.3# L-80 EUE-8rd Mod, 1 KBMG GLM WSOV, securing TEC wire with 1 Cannon clamp over each coupling, test TEC wire every 2,000'. Run completion to 3,114' MD. Install Cavins air slips with side roller @ 1,200'. Good displacement, <lbph losses. OA pressure @ 22:00 hrs=40 psi. PCOMP PUTB P Continue picking u and running 3'/z' 3,114.0 9 g.3# L 80 EUE 8rdpMod, with GLM's, securing TEC wire with 1 Cannon clamp over each coupling, test TEC wire every 2,000'. Run completion from 3,114' MD to 9,583' MD. Good displacement, <lbph losses. S/O @ 9,593' MD=95k. OA pressure @ 11:00 hrs=10 psi. ;PCOMP PUTB P Uontnue picking up 9.3#tL-80 EUE 8 d Mod, rwith GLM & 9,593.0 1 X nipple, securing TEC wire with 1 Cannon clamp over each coupling, test TEC wire every 2,000'. Run completion from 9,593' MD to 14,473' MD. Good displacement, <1bph losses. S/O @ 14,473' MD=105k. 11/19/2016 11/19/2016 check static. Line up to tiii tubing, 1.25 COMPZ2 RPCOMP OTHR serve U-tube. Drop 1-5/16" ball/rod 21:30 2245 h baited sub. Fill pipe, allow ball/rod qFlow drop for 45 minutes. /19/201611/20/2016125 COMPZ2 RPCOMP PUTB ntinue picking up and running 3'/z'14,4 # L-80 EUE 8rd Mod, securing 22:45 00:00 TEC wire with 1 Cannon clamp over each coupling. Run completion from 14,473' MD to 14,977' MD. Good displacement, <1bph losses. OA pressure @ 22:00 hrs=10 psi. Page 64/73 Report F 1 4,4 0 .0 Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase 11/20/2016 11/20/2016 1.00 COMPZ2 00:00 01:00 11 /20/2016 111/20/2016 01:00 02:00 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) ' " EUE t b' 1497701 15.255.0 11/20/2016 02:00 11/20/2016 03:15 1.25 COMPZ2 RPCOMP 11/20/2016 03:15 11/20/2016 03:45 0.50 COMPZ2 RPCOMP 11/20/2016 03:45 11/20/2016 04:15 0.50 COMPZ2 RPCOMF 11/20/2016 04:15 11/20/2016 05:15 1.00 COMPZ2 RPCOMF down, 11/20/2016 05:15 11/20/2016 06:00 0.75 COMPZ2 RPCOMF 11/20/2016 11/20/2016 1.25 GUMI'Zz rtr� 06:00 07:15 11/20/2016 11/20/2016 3.50 COMPZ2 RPC 07:15 10:45 11/20/2016 11/20/2016 2.25 COMPZ2 10:45 13:00 11/20/2016 11/20/2016 1.00 C0MPZ2 13:00 14:00 PUTB P Continue from RIH with 3/2 u ing 14,473' MD to 15,255' MD as per , detail. P/U=144k, S/0=103k. (Picking up jts 480,481,482 and 483 to locate). Observe shear out of locator sub @ 6k down, fully no-go with 15k down. HOSO P Lay down 4 jts 3'/i' E from 15,255' 15,, MD to 15,156' MD to P/U space out pups. OWFF static. (joints pulled wet indicating ball on seat) HOSO P Make up space out pups, 6.18', 10.19, 15,' 10.26', XO to 4'/z' TXP, 1 joint TXP. M/U landing joint "B". RURD P M/U wear ring retrieval tool, latch in 15,; and retrieve wear ring. THGR P L/D landing joint "B", P/U landing joint 15,. "A". Make up hanger and orient. THGR P Terminate TEC wire through hanger, 15, pressure test port to 5000 psi 10 minutes witnessed. THGR P Land tubing hanger @ 15,252' WLEG 15, depth, RILDS per FMC rep. Test hanger seals to 5000 psi 10 minutes witnessed. RURD P Rig up to test tubing. Test surface 15, lines to 4,200 psi- good. PRTS P Pressured up the tubing to 4,100psi 15, observed pressure fluctuation at 2,100psi (initial packer setting pressure 1,800psi) and tested the tubing against the ball and rod on seat. Pressure fluctuating due to changing wind direction changing thermal properties. Finished tubing test and bled pressure down to 2,000psi and blocked in. Lined up to pump on the IA with a hand monitoring the pressure on the OA (50psi). Pressured up on the IA and reached 2,900psi (Tubing tracked to 2,550psi) when there was a sudden loss of pressure on the IA coming down to 300psi and holding and the OA pressure was now at 700psi. Bled the IA down to Opsi and the OA pressure came down to 460psi. Notifications made. P WAIT T Discuss plan forward with town. SIMOPS- Clean and clear rig floor, work orders, P/U double stack tongs. P PRTS T Circulate across top of IA with 20psi on pump. Open OA(460psi) and bleed 2 bbls to the tote. Shut back in OA (440psi) Strap pill pit, 2bbls were pumped down the IA to the OA with minimal pump pressure verifying communication. 15,156.0 15,220.0 0 15,220.0 0 15,220.0 0 15,220.0 0 15,252.0 .0 15,252.0 n 0.0 Page 65173 Report Printed: 1 0. Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Depth (ftKB) End Depth (ftK8) Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation T inue clean and clear rig floor. RID 0.0 0.0 11/20/2016 11/20/2016 2.00 COMPZ2 RPCOMP ELNE esticontng equipment. Prepare for SLB E- 14:00 16:00 Line to perform tubing cut @ —14,565' MD, midway on full joint below SLB gauge/ XO. 11/20/2016 11/20/2016 6.00 COMPZ2 RPCOMP PJSM, Install 4'/2' IBT x 3'/2' EUE XO ELNE T on landing joint for E -Line BOPE. Rig 0.0 0.0 16:00 22:00 up E -Line sheave, BOPE, side entry pump in sub, lubricator/ grease head, hydraulic/ air and grease hoses. P/U weight bar and stab lubricator to BOPE. Establish well control monitoring strategy, release E -Line crew for rest. 11/20/2016 11/21/2016 2.00 COMPZ2 RPCOMP WAIT T R/Utfor and moine crew due timed nitor IA with trip tank,u0 0.0 0.0 22:00 00:00 gain/loss. Rig up HP hose and Tee to pump in sub, monitor tee for returns. OA pressure @ 22:00 hrs=410 psi. Continue to clean rig. 11/21/2016 11/21/2016 7.50 COMPZ2 RPCOMP l WAIT T Continue o cleanrig floor and perform 0.0 0.0 00:00 07:30 work orders while waiting on SLB E - Line. -31 11/21/2016 11/21/2016 1.75 COMPZ2 RPCOMP ELNE T cutter per SLB reps to 31'. M/U Jet 0.0 0 07:30 09:15I 14,509 ELNE T -31.0 14,554.0 11/21/2016 11/21/2016 2.50 COMPZ2 RPCOMP MD, correlate and CCLtCutter on 09:15 09:15 11:45 depth @ 14,554' MD. Monitor IA and tubing on trip tank. OA pressure @ 11:30 hrs=445 psi. COMPZ2LNEetuns 9 14,554.014,554.0 0.25 hroughttubng Gaind bb�or 12:00 while losing 1 bbl on trip tank [11/2:11201:611/21/2016 indicating tubing was cut. 21/20161/21/20160.75COMPZ2COMP ELNE TPOOH with E Line tools.14,554031.0 00 12:45 1.00 COMPZ2 RPCOMP S 0 and rig down SLB cand ELNE T Pg rs.g 31.0 0 11/21/2016 11/21/2016 down sheavves, BOPE XOutter 12:45 13:45 —0 75 COMPZ2 RPCOMP RURD T pup and TIW valve —0 0 14,554.0 11/21/2016 11/21/2016 onLland9 g joint.// 13:45 14:30 140k and PULL T With TIW and IA Shut, ptol14,548' 14,554.0 14,548. 21/2016 11/21/2016 0.25 COMPZ2 RPCOMP pull t bi g / hanger free MD. 30 14:4521/2016 r14: 1.00 COMPZ2 RPCOMP OWFF TP/U h3rsheck wellstatic.14,548.0 14,5480 11/21/2016 thred p!ici __74_,524.0 45 15:45 RPCOMP ig floor, 14,524� PULL T hange- --T4—,548.0 11/21/2016 11/21/2016 1.00 COMPZ2 Discl onnect TErC wire. UD hanger nd 15:45 16:45 landing joint. COMPZ2 RPCOMP ull 4Y2uandgchange PULL T Lay 14,524.0 14,483.0 11/21/2016 11/21/2016 0.25 down out elevators to 16:45 17:00 3'/2'. —7 RPCOMP PULL T ED -8 14,483.0 11,192.0 11/21/2016 11/22/2016 00 50MPZ2 cornped: ioniyfrom 14,483' o 11 192' 17:00 00:00 MD. Re -spooling TEC wire on reel. Removing cannon clamps for re -use. Replacing seal rings in EUE 8rd mod box ends in pipe shed. OA pressure @ 22:00 hrs=440 psi Report Printed: 12/1/2016 Faae 66173 Rig: DOYON 19 Time Log Start Time End Time Dur (hr) Phase 11/22/2016 11/2212016 12.00 50MPZ2 00:00 12:00 112:00 115:45 11/22/2016 11/22/2016 U.bU 15:45 16:15 Depth (WB) 2,779.0 11/22/2016 11/22/2016 1.50 16:15 17:45 11/22/2016 11/22/2016 0.75 17:45 18:30 11/22/2016 11 /22/2016 2.0C 18:30 20:30 11/22/2016 11/22/2016 1.2: 20:30 21:45 11/22/2016 11/22/2016 0.75 21:45 22:30 11/22/2016 11 /22/2016 1.00 22:30 23:30 11/22/2016 11 /23/2016I 0.50 23:30 00:00 Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Op Code Activity Code Time T P -T -X Continue Operation pulliand lay down 3'/2' EUE- Start Depth (ftKB) End 11,192.0 Depth (WB) 2,779.0 COMP PULL 8rd mod completion from 11,192' MD to 2,779' MD. Re -spooling TEC wire on reel. Removing cannon clamps for re -use. Replacing seal rings in EUE 8rd mod box ends in pipe shed. OA pressure @ 11:00 hrs 335 psi COMP PULL T Finished pulling and UD 3 1/5" EUE- 2,779.0 0.0 8rd tubing f/ 2,779' MD to surface. Re -spooled TEC wire, removed cannon clamps and replaced seal rings in EUE-8rd box ends. Joint # 17 was cut 9.49' down with a flared OD of 4". Calculated fill= 49.54 bbl, Act.= 51 bbl 'COMP OWFF T Install Wear ring as per FMC, OWFF. 0.0 0.0 'COMTRURD T L/D completion equipment andcasing 0.0 0.0 tools. clean and clear rig floor. 'COMT PJSM and M/U Baker 7 5/8" left hand 0.0 40.0 set storm packer. RIH and pass the packer in to the 7 5/8" casing. TRIP T RIH on elevators to 1,825' MD 40.0 1,825.( yCOMP PRTS T Set packer at 1,815' MD as per baker 1,825.0 1,825.( 'COMP rep, rotate left while P/U and slack off 10k. Closed top rams, opened Kill and pressured up the IA to 300 psi, pressure held and continued up to 3500 psi and held for 10 minutes. Bleed off and released packer. PCOMP TRIP T RIH f/ 1,825'to 3,063' MD. 1,825.0 3,063.E PCOMP PRTS T Set packer with 25k S/O at 3,052' MD. 3,063.0 3,063. Closed top rams, opened kill line and pressured up IA to 210 psi, observing pressure build up on the OA. Opened top rams and lined up to pressure test down DP and below 3,052' MD. Pressured up 7 5/8" casing below 3,052' MD to 300 psi, observed no increase in IA and continued up to 3500 psi and held for 10 min. Bleed off and released packer. tPCOMP TRIP T POOH f/ 3,063' to 2,682' MD 3,063.0 2,682 Operations Summary (with Timelog Depths) CD5-99 rinted: Job: DRILLING ORIGINAL Rig: DOYON 19 Dur(hr) Phase 3.25 COMPZ2 Op Code RPCOMP Activity Code PRTS Timer -T -X T Operation Continue 'isolating casingleak. Set packer at 2,671' MD and tested up Star: Depth (ftKB) End Depth (ftKB) . 2,682.0 2,330.0 Time Log Start Time 11/23/2016 11/23/2016 End Time 00:00 03:15 Ann, test failed. set packer at 2,386' MD and tested up Ann, test failed. Set packer at 2,291' MD and tested up Ann to 3500 psi, test held. Set packer at 2,355' MD and tested down DP, test good. Set packer at 2,322' MD and tested down DP, test failed. Tested up Ann and test held. Set packer at 2,345' MD and tested down DP to 3500 psi, test held. Set packer at 2,330' MD and tested down DP, test failed. Tested up Ann to 3500 psi and held for 10 min. 7 5/8" casing leak identified between 2,330' and 2,345' MD. 0.25 COMPZ2 RPCOMP OWFF T OWFF, B/D TD and Kill line. 2,330.0 2,330.0 11/23/2016 11/23/2016 03:15 03:30 1.25 COMPZ2 RPCOMP TRIP T POOH f/ 2,330' to 21' MD on elevators. 2,330.0 21.0 11/23/2016 11/23/2016 03:30 04:45 0.25 COMPZ2 1.25 COMPZ2 RPCOMP RPCOMP BHAH ELOG T T LID Baker packer assy, as per Baker rep. Otis adapterandp10pLpubriiicat install 7" 21.0 0• 0.0 0.0 11/23/2016 04:45 11/23/2016 11/23/2016 05:00 11/23/2016 05:00 06:15 extension to rig floor. 2.50 COMPZ2 RPCOMP ELOG T PJSM, P/U and M/U sheaves and double stripper head. Change out 0.0 0.0 11/23/2016 11!23/2016 06:15 08:45 seals on Lub. extension. Pressure 11/23/2016 08:45 11/23/2016 10:000.0 1.25 COMPZ2 5.25 COMPZ2 RPCOMP RPCOMP ELOG ELOG T T test packoffs to 500 psi, test held. P/U g per and M/U casing call logging tools as per SLB. gg 9 R rfcelat 150 ft/hr. Casing damage 0.0 0.0 0.0 11!23/2016 11/23/2016 10:00 15:15 observed at -2,327' MD. 2.50 COMP RPCOMP ELOG T lo/gg ngtools aer siper SLBand P!U Gyro 0.0 0.0 11/23/2016 11/23/2016 15:15 17:450.0 6.25 COMPZ2 RPCOMP ELOG T Gyro logging run f/ 6,800' e t to surface. Logged past stage tool at 0.0 11/23/2016 11/24/2016 17:45 00:00 6,711' MD for depth correlation. 1.25 COMPZ2 RPCOMP ELOG T line i and LI9 Gyro to surface on e- 0.0 0.0 11/24/2016 11/24/2016 00:00 11/24/2016 01:15 11/24/2016 1.25 COMPZ2 RPCOMP ELOG T M/U USIT logging assy as per SLB. 0.0 0.0 01:15 02:300.0 9.00 COMPZ2 RPCOMP ELOG T R rface.IT log from 14,000' MD to 0.0 11/24/2016 11/24/2016 02:30 11:30ggmg 1.00 COMPZ2 1.00 COMPZ2 RPCOMP RPCOMP ELOG ELOG T T tools and RID e -line equ pml nt iadapter, extension and double stripper head. 0.0 0.0 0.0 11/24/2016 11:30 11/24/2016 12:300.0 11/24/2016 11/24/2016 12:30 13:30 Installed trip nipple in rotary head. 0.50 COMPZ2 1.50 COMPZ2 RPCOMP RPCOMP BHAH -S-VG T T floorBaker dressing tools to the rig D awworksf serviced TDt Slip and calibrated block 0.0 0.0 0.0 11/24/2016 13:30 11/24(2016 14:000.0 11/24/2016 11/24/2016 14:00 15:30 1.50 COMPZ2 RPCOMP BHAH T height. as per baker.1/2" tubing dressing assy 0.0 52.0 11/24/2016 11/24/2016 15:30 17:00 rinted: Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Rig: DOYON 19 Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X T Operation RIH f/ 52'to 10,682' MD. Singled in (ftKB) 52.0 End Depth (ftKB) 10,682.0 11/24/2016 11/25/2016 7.00 COMPZ2 RPCOMP TRIP 17:00 00:00 on 78 jts of 14# 4" DP from the pipe shed, then continued on with 15.7# 4" DP stands from the derrick. 11/25/2016 11/25/2016 2.25 COMPZ2 RPCOMP TRIP T Continued RIH f/ 10,682'to 14,496' 10,682.0 14,496.0 00:00 02:15 MD on elevators. P/U= 219k, S/O= 129k. 11/25/2016 11/25/2016 0.50 COMPZ2 RPCOMP CIRC T Break circulation w/ 2 bpm (220 psi) 14,496.0 14,555.0 and tag top of 3 1/2" tubing stump at 02:15 02:45 14,555' MD w/ 6k Wt, 11/25/2016 11/25/2016 1.25 COMPZ2 RPCOMP MILL T Dress of tubing stump as per Baker 14,555.0 14,545.0 02:45 04:00 rep, 2 bpm, 220 psi, 50 rpm, 12k WOB. Milled out flair and tagged up on no-go @14,568' MD w/ 10k WOB and polished off. P/U above tubing stump. 11/25/2016 11/25/2016 3.00 COMPZ2 RPCOMP CIRC T Took SPR, circulated out Cl brine, and 14,545.0 14,545.0 04:00 07:00 pumped BU. Pumped an additional 1.5 BU while increasing brine lubes to 1%. 335 gpm, 2440 gpm. 11/25/2016 11/25!2016 0.50 COMPZ2 RPCOMP CRIH T Spotted 75 bbl of 10.8 ppg Cl brine 14,545.0 14,545.0 07:00 07:30 and chased w/ 120 bbl of 10.8 ppg brine. 335 gpm, 2440 psi, 470 psi on O/A. 11/25/2016 11/25/2016 0.25 COMPZ2 RPCOMP OWFF T OWFF while B/D TD and drop 2.125" 14,545.0 14,545.0 07:30 07:45 hollow drift w/ 105' tail. 11/25/2016 11/25/2016 7.75 COMPZ2 RPCOMP TRIP T POOH f/ 14,545'to 52' MD. 14,545.0 52.0 07:45 15:30 11/25/2016 11/25/2016 1.50 COMPZ2 RPCOMP BHAH T UD Baker dressing tools. 52.0 0.0 15:30 17:00 11/2512016 11/25/2016 2.00 COMPZ2 RPCOMP RURD T Clean and clear rig floor, P/U 0.0 0.0 17:00 19:00 Weatherford tongs, 3 1/2" elevators, and fill up hose. 11/25/2016 11/25/2016 1.25 COMPZ2 PUTB T M/U Barrel and overshot packer, 0.0 105.0 19:00 20:15 2.813" X nipple w/ XX lock lug, Baker PRPCOMP Premier packer, and SBE. 11/25/2016 11/26/2016 3.75 COMPZ2 RCST T RIH with packer assy f/ 105' to 3,924' 105.0 3,924.0 20:15 00:00 MD, filling pipe every 5 stands with fill line. 11/26/2016 11/26/2016 9.50 COMPZ2 RPCOMP RCST T Continue RIH with packer assy f/ 3,924.0 14,549.0 00:00 09:30 3,924' to 14,549' MD, filling pipe every 5 stands with fill line. P/U= 203k, S/O= 142k 11/26/2016 11!26/2016 0.75 COMPZ2 RPCOMP PULD T P/U working single, rig up to set 14,549.0 14,549.0 09:30 10:15 packer, fill lines and pressure test to 3800 psi at surface. 11/26/2016 11/26/2016 0.25 COMPZ2 RPCOMP PACK T RIH and tagged up at 14,558' MD, 14,549.0 14,564.0 sheared swallow pins w/ 9k WOB and 10:15 10:30 continued down to No -Go at 14,564' MD, inserting tubing stump in swallow packing. pressured up to 2800 psi and 140k WOB to set Packer. 11/26/2016 11/26/2016 0.50 COMPZ2 RPCOMP PRTS T Continued pressuring up to 3500 psi 14,564.0 14,564.0 and held for 30 min to test from the X 10:30 11:00 nipple up to the PBR. Test held. P/U with 225k to shear out PBR while holding pressure and bleed off. 11/26/2016 11/26/2016 0.75 C0MPZ2 RPCOMP OWFF T UD working single, B/D lines, and 14,564.0 14,558.0 11:00 11:45 OWFF. Page 69/73 Report Printed: 12/1/2016 Rig: DOYON 19 Time Log U.SU '??'0000:30 06:45 Start Time End Time Dur (hr) Phase 11/26/2016 11/26/2016 1.75 COMPZ2 11:45 13:30 01:00 01:30 11/26/2016 11/27/2016 10.50 COMPZ2 13:30 00:00 Clean and clear rig floor. P/U BHA 11 /27/20161 11 /27/2016 11/27/2016 U.SU '??'0000:30 06:45 stands of 14# 4" DP. 1 joint of 15.7# 11/27/2016 11/27/2016 0.50 00:30 01:00 washing out on the tool face and was 11/27/2016 11/27/2016 0.50 01:00 01:30 Finish singling OOH f/ 479' to 37' MD. 11/2712016 11/27/2016 1.00 01:30 2:30 Clean and clear rig floor. P/U BHA 11 /27/20161 /27/2016 1.50 02:30 104:00 Inspect derrick, service TD, 11/27/201f11/27/2016 11/27/201611/27/2016 2.01 2.00 T 04:00 06:00 T 11/2 7/2016 111/27/2016 I 0.25 06:00 06:15 11/27/2016 11/27!2016 0.50 06:15 06:45 stands of 14# 4" DP. 1 joint of 15.7# 11/27/2016 11 /27/2016 1.00 06:45 07:45 washing out on the tool face and was 11/27/2016 11/27/2016 1.7` 07:45 09:30 Finish singling OOH f/ 479' to 37' MD. 11/27/2016 11/27/2016 0.5( 09:30 10:00 Clean and clear rig floor. P/U BHA 11127/2016 11 /27/2016 1.00 10:00 11:00 Inspect derrick, service TD, 11/27/201f11/27/2016 6 2.01 11:00 T derrick and oiled TD. 11/27/2016 T 0.7 13:00 M/U inner string assy and latch in to string mills. 11 /27/2016 T 1.5 13:45 1P MD. Observed weight bobble at 11/27/20166 RIH with 7 5/8" casing patch f/ 250' to 2,458.72' MD. 1.2 15:15 16:30 Ream down f/ 2,293' to 2,388' MD with 11/27/2016 11/27/2016 2,E 16:30 19:00 Stopped pumps/ROT and RIH f/ 2,388' 11 /27/2016 11 /27/2016 2 ` 19:00 21:30 obstruction. Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth Operation (ftKB) End Depth (ftKB) Code Activity Code Time P -T -X 1 MP TRIP T POOH f! 14,558' to 11,692' MD, 14,558.0 1,692.0 racking back 32 stands of 15.7# 4" DP in derrick. 11 692' to 479' MD 11.692.0 479.0 rage 47 2 0.0 0 0.0 01 01 12/1/2016 T Single OOH f! L/D 95 stands of 15.7# 4" DP and 22 Clean and clear rig door. D stands of 14# 4" DP. 1 joint of 15.7# T Pull wear ring, install upper test plug and P/U 6" test joint. Fill stack with DP from Std. # 34 showed singes of washing out on the tool face and was D BOPE set aside. Tested Annular to 250/2500 psi for 5 min and held. Upper 3.5" x 6" VBRs and lower 3.5" x 6" VBRs to 250/3500 T Finish singling OOH f/ 479' to 37' MD. T L/D seal assyas per Baker. —ff.--PE T Clean and clear rig floor. P/U BHA P RURD components to rig floor. Rig up casing patch running equipment and bring components to T Inspect derrick, service TD, rig floor. drawworks, blocks. Removed ice from BHAH T derrick and oiled TD. IP T M!U baker clean out assy. w/ 6.81 OD T M/U inner string assy and latch in to string mills. T RIH on 4" 15.7# DP f/ 200' to 2,348' spear. 1P MD. Observed weight bobble at T RIH with 7 5/8" casing patch f/ 250' to 2,458.72' MD. 2,293' MD and P/U to wash/ream out. T Ream down f/ 2,293' to 2,388' MD with 300 gpm, 550 psi, 50 rpm, 1.5k TQ, Stopped pumps/ROT and RIH f/ 2,388' to 2,483' MD with no indications of obstruction. T Circulate BU at 300 gpm, 540 psi, w/ reciprocate. B/D DP and OWFF. T POOH f/ 2,483' to 200' MD. i T L/D Baker clean out assy. rage 47 2 0.0 0 0.0 01 01 12/1/2016 T Clean and clear rig door. D EBHAH BOPE T Pull wear ring, install upper test plug and P/U 6" test joint. Fill stack with H2O. D BOPE T Tested Annular to 250/2500 psi for 5 min and held. Upper 3.5" x 6" VBRs and lower 3.5" x 6" VBRs to 250/3500 psi, Both tests held. P7-- —ff.--PE T R/D test equipment, remove test plug, and install wear ring. P RURD T Rig up casing patch running equipment and bring components to rig floor. BHAH T —M/—U7-518' casing patch sections to 250' MD. IP BHAH T M/U inner string assy and latch in to IP spear. 1P TRIP T RIH with 7 5/8" casing patch f/ 250' to 2,458.72' MD. rage 47 2 0.0 0 0.0 01 01 12/1/2016 Rig: DOYON 19 Time Log Start Time End Time our (hr) Phase 11/27/2016 11/27/2016 1.50 COMPZ2 21:30 23:00 11 /27/2016 11/28/201b 23:00 00:00 11/23/2016 11 /28/2016 00:00 00:30 11/2B12016 11128/2016 00:30 02:15 11/28/2016 11/28/2016 02:15 03:30 11/28/2016 11 /zb1zu.1b 03:30 05:30 11 /28/2016 11 /28/2016 05:30 08:30 11 /28/2016 111/29/2016 08:30 00:00 11 /29/2016 11/29/2016 00:00 08:30 11 /29/2016 11 /29/201 E 08:30 09:00 11/29/2016 11129/2011 09:00 10:00 11 /29/2016 11 /29/201 10:00 13:30 Op Code COMP OTHR 11/29/2016 11/29/201 113:30 14:30 E 00 E Off, Operations Summary (with Timelog Depths) CD5-99 Activity Code Time T P -T -X Set SIO Job: DRILLING Operation 7 518" casing patch as per WFT. to 95k and built pressure at 0.5 ORIGINAL Start Depth (MB) End 2. 458 7 Depth (ftKB) 2,242.0 Op Code COMP OTHR bpm to 1900 psi and observed expansion tool shear. continued pumping with pressure between 2200- 2900 psi, stroking piston several times to initiate expansion and finished pumping with 3400 psi. S/O 10k to confirm anchor had set, good. Proceeded to expand the rest of the liner pooling at 900 ft/hr w/ 85-210k O/P to 2,242' MD, L/D singles as they were pulled. Top of Patch at 2,271' MD Base of Patch at 2,458' MD 'COMP TRIP T POOH f/ 2,271' to 627' MD 2,242.0 627.0 TRIP T Continue POOH f/ 627' to 184' MD. 627.0 184.0 'COMP BHAH T L/D Hydraulic jack and 3 1/2" inner 184.0 0.0 COMP string tubing as per WFT. PRTS T Pressure tested 7 5/8" casing and 0.0 0.0 COMP casing patch to 3500 psi for 30 min. Test held. OA started at 370 psi and build to 500 psi with 3500 psi on 7 5/8" casing. Once bleed off OA returned to 370 psi. PCOMP RURD T -- WFT running tools and casing 0.0 0.0 tongs. Clean and cleared floor. PCOMP RURD T P/U and R/U 3 1/2" tubing running 0.0 0.0 a equipment. L/D old I -wire spool nd PIU new I -wire. P/U cannon clamps and arrange on rig floor. Bring tubing components to rig floor, hanger, XOs, and pups. T Te in TEC line and pressure test to 00 9,3390 .PCOM7PUTB 5000 psi. Start RIH with 3 1/2" upper completion to 9,339'MD as per tally. Continued testing TEC line every 60 jts. PUT T Continue RIH with 3 1/2" -tubing f/ 0.0 14,399.0 ZPCOMP 9,339' to 14,399' MD. testing I -wire every 60 jts. PUTB T continued in 011 4 jts of 3 1/2" EUE 14,399.0 14,490.0 2PCOMP tubing to 14,460' MD. Rigged up head pin and rolled pump at 1 bpm to observe seals entering the PBR at 14,459' MD. Cut pumps and continued in to No -Go at 14,490' MD and SIO 10k to confirm. HOSO T UD 4 jts of 3 1/2" tubing and space 14,490.6'__T4,490 0 PPCOMP out, M/U with 10.19' pup, XO and 4 1/2" TXP jnt. THGR T M/U WR retrieval tool and retrieve 14,490.0 14,490.0 RPCOMP same. M/U 4 1/4" tubing hanger and landing joints. Terminate I -wire and land hanger. PIU= 135k, S/O= 105k. RPC MMP THGR T RILDS, R/U test equipment and test hanger seals to 250/5000 psi for 5/10 14,490.0 14,490.0 min. Report Printed: 12/1/2016 Page 71173 Rig: DOYON 19 Time Log Start Time End Time our (hr) Phase 11/29/2016 11/29/2016 2.25 50MPZ2 14:30 16:45 11/29/2016 11/2912016 16:45 18:15 11/29/2016 11 /29/2016 18:15 20:30 11/29/2016 11/29/2016 20:30 22:15 11/2)/2016 11 /30/2016 22:15 00:30 fiil Pi Operations Summary (with Timelog Depths) CD5-99 Job: DRILLING ORIGINAL Start Depth Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftK0) t T bmstrin to 3500 psi 14.490.0 14,490.0 0.0 K 00:30 PRTS T Pressure tes u g g for 30 min and held. Bleed off to 2000 P an I' nesnged ira 0 0 psi and pressure tested IA to 3500 psi 11/30/2016 11/30/2016 4.50 COMPZ2 for 30 min. Bleed off both and BOP stack andisconnect k bace keTe mi ated pressure up IA to 1940 psi and shear 00:00 04:30 SOV. > MPSP P UD landing joint and install HP-BPV and test in direction of flow to 2500 psi out saver sub on TD, UD I -line spool, for 15 min. 5 WWWH P Clean drip pan, Flush stack, B/D TD and mobilized Surface BHA and lines, remove trip nipple, and clear floor. MPDA P Rig down Flo -box, RCD clamp, hoses, 11/30/2016 11/30/2016 2.25 COMPZ2 and orbit valve. Sim -Ops Bring new PInstalled smooth bore metal seal and N/U tree as per FMC. Tested adapter 0.0 blind rams in to cellar. 04:30 SVRG P Change out blind rams on BOP. Oper flange to 5000 psi for 10 min. SLB doors on upper rams for BWM. Sim - Ops, L/D trip nipple, equipment from tested TEC lines. Both tests good. rig floor and Remove XT -39 saver 11/30/2016 11/30/2016 1.50 COMPZ2 sub. P NUND P UD mouse hole and loosen choke 0.0 K 00:30 01:00 NUND P an I' nesnged ira 0 0 0.0 11/30/2016 11/30/2016 4.50 COMPZ2 WHDBOP BOP stack andisconnect k bace keTe mi ated 00:00 04:30 I -line as per SLB. Sim -Ops, cha out saver sub on TD, UD I -line spool, and mobilized Surface BHA components to rig floor. 11/30/2016 11/30/2016 2.25 COMPZ2 WHDBOP NUND PInstalled smooth bore metal seal and N/U tree as per FMC. Tested adapter 0.0 0.0 04:30 06:45 flange to 5000 psi for 10 min. SLB tested TEC lines. Both tests good. 11/30/2016 11/30/2016 1.50 COMPZ2 WHDBOP -15-RTS P harted. 25Fil1ed tree w/ diesel and 0 5000 psi for 10 min and charted. 0.0 0.0 06:45 08:15 (good) 0.75 COMPZ2 WHDBOP MPSP P and remove test dart 0.0 0.0 11/30/2016 11!30/2016 and BPVicator as 08:15 09:00 RURD P and 0 0 0.0 11/30/2016 11/30/2016 1.50 COMPZ2 WHDBOP U-tube. be. testede nes to 2500 psi and 09:00 10:30 held. COMPZ2 WHDBOP FRZP P w/ 89.5line dies down the 0'0 0.0 11/30/2016 11/30/2016 2.25 IIA and taking brrotect returns 10:30 12:45 up tubing. Sim -Ops, UD 4" DP from derrick. 11/30/2016 11/30/2016 0.75 COMPZ2 WHDBOP FRZP P Allowg ng downto U-tube for 30 min li es. Sim Ops continue 0 0 0.0 12:45 13:30 UD 4" DP 11/30/2016 11/30!2016 1.00 COMPZ2 WHDBOP MPSP P pressure rlonttubing,i2001pBPPressure V. Final 0 0 0.0 13:30 14:30 tested against BPV in direction of flow to 2500 psi and held for 15 min. Test good. Well secure at 14:30 hrs. 11/30/2016 11/30/2016 3.00 COMPZ2 MOVE RURD P leed off and D test lines, emptied cell Lubricator.,leaned p s,, and Q-0 0.0 14:30 17:30 continued to UD 4" DP. Rig on Gen Power @ 15:40 hrs 1 21112 01 6 I Operations Summary (with Timelog Depths) CD5-99 Rig: DOYON 19 Job: DRILLING ORIGINAL Time Log start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) 0.0 End Depth (ftKB) 0.0 11/30/2016 11/30/2016 2.50 COMPZ2 MOVE MOB P Disconnect service lines to sub, freeze 17:30 20:00 protect pumps, and disconnect. Moved Ball mill to new location. Finished cleaning OBM from pipe racks and B/D steam lines. Release rig @ 20:00 hrs Page 73173 Report Printed: 12/1/2016 NADConversion Western North Slope CD5 Alpine West Pad CDS-99AL1 CD5-99AL1 Definitive Survey Report 05 December, 2016 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-99 Date Well Position +N/ -S 0.00 usft Northing: 5,965,920.93 usft Latitude: 70° 18' 50.421 N +E/ -W 0.00 usft Easting: 349,558.53 usft Longitude: 151° 13' 9.507 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft Wellbore CD5-99AL1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) (°) (nT) BG G M 2016 11/2/2016 17.47 80.81 57,509 Design CD5-99AL1 Date Audit Notes: From To Map Version: 1 0 Phase: ACTUAL Tie On Depth: 15,046.95 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction 500.00 CD5-99 Svyl - SLB_NSG-SSHOT (CD5- (usft) (usft) (usft) (°) 572.96 36.55 0.00 0.00 152.00 Survey Program Date From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 100.00 500.00 CD5-99 Svyl - SLB_NSG-SSHOT (CD5- GYD-GC-SS Gyrodata gyro single shots 8/28/2016 11:46: 572.96 2,270.51 CD5-99 Svy2 - SLB _ MWD _GMAG (CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/28/2016 11:55: 2,354.63 2,354.63 CD5-99A Svyl - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer+ known azi trend 10/1/2016 11:11: 2,400.38 15,046.95 CD5-99A Svy2 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/1/2016 11:23: 15,079.88 15,268.80 CD5-99AL1 Svy1 - SLB _Inc+Filler (CD5- INC+TREND Inclinometer + known azi trend 11/5/2016 6:23:1 15,364.69 16,760.35 CD5-99AL1 Svy2 - SLB_MWD+GMAG (C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 11/5/2016 6:32:1 Survey 12/5/2016 10: 45 20A Page 2 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc An TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.90 0.00 0.00 5,965,920.93 349,558.53 0.00 0.00 UNDEFINED 100.00 0.35 80.47 100.00 29.55 0.03 0.19 5,965,920.96 349,558.72 0.55 0.06 GYD-GC-SS (1) 200.00 0.30 136.60 200.00 129.55 -0.11 0.67 5,965,920.81 349,559.20 0.31 0.41 GYD-GC-SS(1) 300.00 0.42 180.43 300.00 229.55 -0.66 0.85 5,965,920.25 349,559.36 0.29 0.99 GYD-GC-SS(1) 400.00 1.46 178.92 399.98 329.53 -2.30 0.87 5,965,918.61 349,559.35 1.04 2.44 GYD-GC-SS(1) 500.00 2.50 174.40 499.92 429.47 -5.75 1.11 5,965,915.16 349,559.52 1.05 5.60 GYD-GC-SS(1) 572.96 2.84 173.07 572.80 502.35 -9.13 1.48 5,965,911.78 349,559.83 0.47 8.75 MWD+IFR-AK-CAZ-SC (2) 659.55 3.53 165.66 659.26 588.81 -13.84 2.40 5,965,907.05 349,560.65 0.93 13.35 MWD+IFR-AK-CAZ-SC (2) 751.03 4.95 165.13 750.48 680.03 -20.38 4.11 5,965,900.47 349,562.23 1.55 19.93 MWD+IFR-AK-CAZ-SC (2) 845.81 7.79 162.16 844.67 774.22 -30.45 7.13 5,965,890.35 349,565.04 3.02 30.23 MWD+IFR-AKCAZ-SC (2) 12/5/2016 10: 45 20A Page 2 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (1) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 940.37 11.22 158.66 937.92 867.47 -45.12 12.44 5,965,875.57 349,570.06 3.68 45.68 MWD+IFR-AK-CAZ-SC (2) 1,034.58 13.28 155.03 1,029.98 959.53 -63.47 20.34 5,965,857.07 349,577.60 2.33 65.60 MWD+IFR-AK-CAZ-SC (2) 1,129.57 14.30 153.79 1,122.23 1,051.78 -83.89 30.13 5,965,836.46 349,586.97 1.12 88.22 MWD+IFR-AK-CAZ-SC (2) 1,222.50 14.94 150.97 1,212.15 1,141.70 -104.66 41.01 5,965,815.48 349,597.43 1.03 111.66 MWD+IFR-AK-CAZ-SC (2) 1,317.05 15.53 150.01 1,303.38 1,232.93 -126.28 53.26 5,965,793.62 349,609.24 0.68 136.50 MWD+IFR-AK-CAZ-SC (2) 1,410.15 17.57 146.48 1,392.62 1,322.17 -148.79 67.25 5,965,770.83 349,622.78 2.44 162.95 MWD+IFR-AK-CAZ-SC (2) 1,506.38 21.17 141.10 1,483.40 1,412.95 -174.44 86.19 5,965,744.82 349,641.20 4.17 194.48 MWD+IFR-AK-CAZ-SC (2) 1,600.00 23.81 137.20 1,569.89 1,499.44 -201.46 109.65 5,965,717.33 349,664.11 3.24 229.36 MWD+IFR-AK-CAZ-SC (2) 1,694.62 26.66 133.78 1,655.48 1,585.03 -230.17 137.96 5,965,688.06 349,691.84 3.38 268.00 MWD+IFR-AK-CAZ-SC (2) 1,788.88 29.81 132.16 1,738.51 1,668.06 -260.54 170.60 5,965,657.05 349,723.86 3.44 310.13 MWD+IFR-AK-CAZ-SC (2) 1,882.95 32.44 130.76 1,819.04 1,748.59 -292.71 207.05 5,965,624.15 349,759.66 2.90 355.65 MWD+IFR-AK-CAZ-SC (2) 1,976.79 33.94 130.25 1,897.56 1,827.11 -326.07 246.11 5,965,590.02 349,798.04 1.63 403.45 MWD+IFR-AK-CAZ-SC (2) 2,070.83 35.82 129.12 1,974.71 1,904.26 -360.40 287.50 5,965,554.87 349,838.73 2.11 453.19 MWD+IFR-AK-CAZ-SC (2) 2,165.49 37.79 127.90 2,050.50 1,980.05 -395.70 331.88 5,965,518.69 349,882.39 2.22 505.19 MWD+IFR-AK-CAZ-SC (2) 2,259.49 40.14 127.23 2,123.58 2,053.13 -431.72 378.74 5,965,481.74 349,928.52 2.54 559.00 MWD+IFR-AK-CAZ-SC (2) 2,270.51 40.86 126.48 2,131.96 2,061.51 -436.02 384.47 5,965,477.33 349,934.15 7.89 565.48 MWD+IFR-AK-CAZ-SC (2) 10-3/4" x 13-1/2" 2,354.63 39.48 125.36 2,196.24 2,125.79 -467.85 428.40 5,965,444.62 349,977.44 1.85 614.21 INC+TREND (3) 2,400.38 38.27 124.71 2,231.85 2,161.40 -484.34 451.91 5,965,427.67 350,000.61 2.79 639.81 MWD+IFR-AK-CAZ-SC (4) 2,449.55 39.97 124.54 2,270.00 2,199.55 -501.97 477.44 5,965,409.54 350,025.78 3.46 667.35 MWD+IFR-AK-CAZ-SC (4) 2,496.41 42.85 122.76 2,305.14 2,234.69 -519.13 503.25 5,965,391.87 350,051.24 6.64 694.62 MWD+IFR-AK-CAZ-SC (4) 2,543.50 45.60 122.60 2,338.88 2,268.43 -536.86 530.89 5,965,373.59 350,078.52 5.84 723.25 MWD+IFR-AK-CAZ-SC (4) 2,590.10 47.02 122.20 2,371.07 2,300.62 -554.91 559.34 5,965,354.97 350,106.60 3.11 752.55 MWD+IFR-AK-CAZ-SC (4) 2,638.47 48.78 121.65 2,403.50 2,333.05 -573.89 589.80 5,965,335.39 350,136.67 3.74 783.61 MWD+IFR-AK-CAZ-SC (4) 2,685.65 50.29 121.67 2,434.12 2,363.67 -592.73 620.35 5,965,315.94 350,166.83 3.20 814.58 MWD+IFR-AK-CAZ-SC (4) 2,733.47 52.01 121.23 2,464.11 2,393.66 -612.15 652.12 5,965,295.88 350,198.21 3.67 846.65 MWD+IFR-AK-CAZ-SC (4) 2,781.44 53.64 120.35 2,493.10 2,422.65 -631.72 684.96 5,965,275.66 350,230.64 3.70 879.34 MWD+IFR-AK-CAZ-SC (4) 2,827.79 55.19 120.21 2,520.07 2,449.62 -650.72 717.51 5,965,256.01 350,262.80 3.35 911.40 MWD+IFR-AK-CAZ-SC (4) 2,873.78 56.60 120.81 2,545.86 2,475.41 -670.06 750.31 5,965,236.03 350,295.21 3.25 943.88 MWD+IFR-AK-CAZ-SC (4) 2,921.08 57.79 121.21 2,571.48 2,501.03 -690.54 784.39 5,965,214.87 350,328.86 2.61 977.96 MWD+IFR-AK-CAZ-SC (4) 3,016.32 59.97 123.67 2,620.71 2,550.26 -734.28 853.17 5,965,169.76 350,396.76 3.18 1,048.87 MWD+IFR-AK-CAZ-SC (4) 3,061.84 61.29 123.58 2,643.03 2,572.58 -756.25 886.21 5,965,147.13 350,429.34 2.90 1,083.78 MWD+IFR-AK-CAZ-SC (4) 3,111.30 62.67 123.84 2,666.27 2,595.82 -780.48 922.53 5,965,122.18 350,465.16 2.83 1,122.22 MWD+IFR-AK-CAZ-SC (4) 3,157.34 64.23 123.66 2,686.85 2,616.40 -803.36 956.77 5,965,098.62 350,498.94 3.41 1,158.50 MWD+IFR-AK-CAZ-SC (4) 3,203.86 65.52 123.31 2,706.60 2,636.15 -826.60 991.90 5,965,074.69 350,533.59 2.86 1,195.51 MWD+IFR-AK-CAZ-SC (4) 3,299.05 65.99 123.09 2,745.69 2,675.24 -874.12 1,064.52 5,965,025.72 350,605.24 0.54 1,271.57 MWD+IFR-AK-CAZ-SC (4) 3,392.96 66.08 122.52 2,783.83 2,713.38 -920.62 1,136.65 5,964,977.80 350,676.42 0.56 1,346.48 MWD+IFR-AK-CAZ-SC (4) 3,487.44 65.97 122.70 2,822.22 2,751.77 -967.14 1,209.37 5,964,929.83 350,748.19 0.21 1,421.70 MWD+IFR-AK-CAZ-SC (4) 3,583.78 66.02 122.64 2,861.42 2,790.97 -1,014.65 1,283.45 5,964,880.85 350,821.30 0.08 1,498.42 MWD+IFR-AK-CAZ-SC (4) 3,677.93 66.02 121.78 2,899.68 2,829.23 -1,060.50 1,356.24 5,964,833.55 350,893.15 0.83 1,573.08 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10:45:20AM Page 3 COMPASS 5000.1 Build 74 SLB Definitive Survey Repoli Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N1S +E/ -W Northing Easting DLS Section (usft) V) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 3,770.86 66.02 121.62 2,937.45 2,867.00 -1,105.12 1,428.48 5,964,787.50 350,964.47 0.16 1,646.39 MWD+IFR-AK-CAZ-SC (4) 3,865.49 66.11 120.21 2,975.84 2,905.39 -1,149.55 1,502.68 5,964,741.59 351,037.77 1.37 1,720.46 MWD+IFR-AK-CAZ-SC (4) 3,959.41 66.09 119.23 3,013.89 2,943.44 -1,192.12 1,577.25 5,964,697.54 351,111.46 0.95 1,793.05 MWD+IFR-AK-CAZ-SC(4) 4,054.40 66.09 119.90 3,052.39 2,981.94 -1,234.97 1,652.78 5,964,653.19 351,186.11 0.64 1,866.34 MWD+IFR-AK-CAZ-SC (4) 4,147.49 66.12 119.78 3,090.10 3,019.65 -1,277.32 1,726.61 5,964,609.37 351,259.07 0.12 1,938.40 MWD+IFR-AK-CAZ-SC (4) 4,242.73 65.49 119.45 3,129.13 3,058.68 -1,320.25 1,802.13 5,964,564.94 351,333.72 0.73 2,011.76 MWD+IFR-AK-CAZ-SC (4) 4,337.15 65.55 118.48 3,168.26 3,097.81 -1,361.86 1,877.32 5,964,521.83 351,408.04 0.94 2,083.80 MWD+IFR-AK-CAZ-SC (4) 4,430.83 65.43 119.60 3,207.12 3,136.67 -1,403.23 1,951.84 5,964,478.98 351,481.72 1.10 2,155.32 MWD+IFR-AK-CAZ-SC (4) 4,526.10 65.57 119.96 3,246.63 3,176.18 -1,446.29 2,027.08 5,964,434.42 351,556.07 0.37 2,228.66 MWD+IFR-AK-CAZ-SC (4) 4,619.67 65.37 119.87 3,285.48 3,215.03 -1,488.75 2,100.86 5,964,390.50 351,628.99 0.23 2,300.78 MWD+IFR-AK-CAZ-SC (4) 4,714.13 65.56 118.38 3,324.71 3,254.26 -1,530.57 2,175.93 5,964,347.19 351,703.19 1.45 2,372.95 MWD+IFR-AK-CAZ-SC (4) 4,809.66 65.41 118.91 3,364.34 3,293.89 -1,572.23 2,252.21 5,964,304.01 351,778.62 0.53 2,445.55 MWD+IFR-AK-CAZ-SC (4) 4,903.76 65.46 118.93 3,403.46 3,333.01 -1,613.62 2,327.12 5,964,261.13 351,852.68 0.06 2,517.26 MWD+IFR-AK-CAZ-SC (4) 4,997.13 65.61 118.54 3,442.13 3,371.68 -1,654.48 2,401.64 5,964,218.79 351,926.36 0.41 2,588.32 MWD+IFR-AK-CAZ-SC (4) 5,091.58 65.85 118.35 3,480.95 3,410.50 -1,695.49 2,477.35 5,964,176.27 352,001.22 0.31 2,660.07 MWD+IFR-AK-CAZ-SC (4) 5,186.76 65.98 118.27 3,519.80 3,449.35 -1,736.70 2,553.85 5,964,133.54 352,076.88 0.16 2,732.37 MWD+IFR-AK-CAZ-SC (4) 5,279.36 65.94 118.31 3,557.52 3,487.07 -1,776.78 2,628.31 5,964,091.98 352,150.52 0.06 2,802.72 MWD+IFR-AK-CAZ-SC (4) 5,375.09 65.80 118.22 3,596.65 3,526.20 -1,818.15 2,705.26 5,964,049.08 352,226.62 0.17 2,875.37 MWD+IFR-AK-CAZ-SC (4) 5,469.64 65.82 118.03 3,635.40 3,564.95 -1,858.81 2,781.33 5,964,006.91 352,301.85 0.18 2,946.98 MWD+IFR-AK-CAZ-SC (4) 5,562.68 65.72 118.69 3,673.58 3,603.13 -1,899.11 2,855.99 5,963,965.13 352,375.68 0.66 3,017.62 MWD+IFR-AK-CAZ-SC (4) 5,656.11 65.52 118.69 3,712.15 3,641.70 -1,939.96 2,930.64 5,963,922.79 352,449.49 0.21 3,088.73 MWD+IFR-AK-CAZ-SC (4) 5,751.20 65.37 118.51 3,751.66 3,681.21 -1,981.36 3,006.57 5,963,879.88 352,524.58 0.23 3,160.94 MWD+IFR-AK-CAZ-SC (4) 5,845.38 65.39 117.03 3,790.90 3,720.45 -2,021.25 3,082.33 5,963,838.48 352,599.51 1.43 3,231.73 MWD+IFR-AK-CAZ-SC (4) 5,939.38 65.59 116.84 3,829.90 3,759.45 -2,060.00 3,158.58 5,963,798.22 352,674.97 0.28 3,301.73 MWD+IFR-AK-CAZ-SC (4) 6,033.53 65.51 117.08 3,868.87 3,798.42 -2,098.85 3,234.97 5,963,757.84 352,750.56 0.25 3,371.90 MWD+IFR-AK-CAZ-SC (4) 6,127.05 65.97 117.21 3,907.29 3,836.84 -2,137.75 3,310.84 5,963,717.43 352,825.63 0.51 3,441.87 MWD+IFR-AK-CAZ-SC (4) 6,220.59 66.04 117.69 3,945.33 3,874.88 -2,177.15 3,386.68 5,963,676.53 352,900.65 0.47 3,512.25 MWD+IFR-AK-CAZ-SC (4) 6,315.27 65.97 118.38 3,983.83 3,913.38 -2,217.80 3,463.02 5,963,634.36 352,976.17 0.67 3,583.99 MWD+IFR-AK-CAZ-SC (4) 6,409.67 66.13 118.52 4,022.15 3,951.70 -2,258.90 3,538.88 5,963,591.75 353,051.18 0.22 3,655.89 MWD+IFR-AK-CAZ-SC (4) 6,503.79 66.01 118.96 4,060.33 3,989.88 -2,300.27 3,614.31 5,963,548.88 353,125.76 0.45 3,727.83 MWD+IFR-AK-CAZ-SC (4) 6,597.09 65.42 119.01 4,098.70 4,028.25 -2,341.48 3,688.70 5,963,506.20 353,199.30 0.63 3,799.14 MWD+IFR-AK-CAZ-SC (4) 6,691.36 65.60 118.33 4,137.78 4,067.33 -2,382.63 3,763.97 5,963,463.54 353,273.73 0.68 3,870.82 MWD+IFR-AK-CAZ-SC (4) 6,785.93 65.05 117.50 4,177.26 4,106.81 -2,422.87 3,839.91 5,963,421.80 353,348.84 0.99 3,941.99 MWD+IFR-AK-CAZ-SC (4) 6,880.32 64.95 118.47 4,217.15 4,146.70 -2,463.01 3,915.45 5,963,380.16 353,423.55 0.94 4,012.90 MWD+IFR-AK-CAZ-SC (4) 6,974.08 65.54 119.25 4,256.42 4,185.97 -2,504.10 3,990.02 5,963,337.58 353,497.28 0.98 4,084.19 MWD+IFR-AK-CAZ-SC (4) 7,068.23 65.52 119.63 4,295.41 4,224.96 -2,546.22 4,064.64 5,963,293.97 353,571.04 0.37 4,156.42 MWD+IFR-AK-CAZ-SC (4) 7,163.21 65.53 120.14 4,334.76 4,264.31 -2,589.30 4,139.59 5,963,249.41 353,645.11 0.49 4,229.63 MWD+IFR-AK-CAZ-SC (4) 7,254.95 65.55 119.82 4,372.75 4,302.30 -2,631.02 4,211.93 5,963,206.25 353,716.58 0.32 4,300.44 MWD+IFR-AK-CAZ-SC (4) 7,349.11 65.49 120.15 4,411.77 4,341.32 -2,673.85 4,286.15 5,963,161.94 353,769.93 0.33 4,373.10 MWD+IFR-AK-CAZ-SC (4) 7,443.24 65.53 120.53 4,450.79 4,380.34 -2,717.12 4,360.08 5,963,117.20 353,862.97 0.37 4,446.01 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10 4520AM Page 4 COMPASS 5000.1 Build 74 i SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 7,537.81 65.62 121.26 4,489.89 4,419.44 -2,761.33 4,433.97 5,963,071.52 353,935.95 0.71 4,519.74 MWD+IFR-AK-CAZ-SC (4) 7,631.19 65.55 121.92 4,528.49 4,458.04 -2,805.88 4,506.40 5,963,025.54 354,007.47 0.65 4,593.07 MWD+IFR-AK-CAZ-SC (4) 7,723.34 65.59 121.62 4,566.60 4,496.15 -2,850.05 4,577.73 5,962,979.95 354,077.90 0.30 4,665.56 MWD+IFR-AK-CAZ-SC (4) 7,818.15 65.53 121.19 4,605.83 4,535.38 -2,895.03 4,651.40 5,962,933.51 354,150.64 0.42 4,739.85 MWD+IFR-AK-CAZ-SC (4) 7,913.03 65.50 120.34 4,645.15 4,574.70 -2,939.19 4,725.59 5,962,887.87 354,223.93 0.82 4,813.69 MWD+IFR-AK-CAZ-SC (4) 8,006.35 65.49 119.93 4,683.86 4,613.41 -2,981.82 4,799.03 5,962,843.78 354,296.50 0.40 4,885.80 MWD+IFR-AK-CAZ-SC (4) 8,101.59 65.59 118.86 4,723.30 4,652.85 -3,024.37 4,874.56 5,962,799.73 354,371.15 1.03 4,958.83 MWD+IFR-AK-CAZ-SC (4) 8,194.58 65.58 119.13 4,761.73 4,691.28 -3,065.42 4,948.62 5,962,757.21 354,444.37 0.26 5,029.84 MWD+IFR-AK-CAZ-SC (4) 8,290.23 65.53 119.28 4,801.31 4,730.86 -3,107.91 5,024.63 5,962,713.21 354,519.51 0.15 5,103.04 MWD+IFR-AK-CAZ-SC (4) 8,384.19 65.40 119.02 4,840.33 4,769.88 -3,149.54 5,099.28 5,962,670.09 354,593.30 0.29 5,174.85 MWD+IFR-AK-CAZ-SC (4) 8,477.96 65.40 118.57 4,879.37 4,808.92 -3,190.61 5,173.99 5,962,627.54 354,667.17 0.44 5,246.18 MWD+IFR-AK-CAZ-SC (4) 8,571.84 65.43 117.50 4,918.43 4,847.98 -3,230.73 5,249.34 5,962,585.92 354,741.70 1.04 5,316.98 MWD+IFR-AK-CAZ-SC (4) 8,665.25 65.65 116.91 4,957.10 4,886.65 -3,269.60 5,324.96 5,962,545.54 354,816.52 0.62 5,386.81 MWD+IFR-AK-CAZ-SC (4) 8,760.88 65.94 116.99 4,996.31 4,925.86 -3,309.13 5,402.71 5,962,504.46 354,893.46 0.31 5,458.21 MWD+IFR-AK-CAZ-SC (4) 8,855.16 66.00 117.54 5,034.70 4,964.25 -3,348.58 5,479.26 5,962,463.49 354,969.19 0.54 5,528.98 MWD+IFR-AK-CAZ-SC (4) 8,947.50 66.06 118.23 5,072.22 5,001.77 -3,388.04 5,553.83 5,962,422.55 355,042.96 0.69 5,598.83 MWD+IFR-AK-CAZ-SC (4) 9,041.26 66.16 118.79 5,110.19 5,039.74 -3,428.96 5,629.17 5,962,380.13 355,117.45 0.56 5,670.33 MWD+IFR-AK-CAZ-SC (4) 9,135.01 66.13 119.41 5,148.10 5,077.65 -3,470.66 5,704.08 5,962,336.94 355,191.51 0.61 5,742.32 MWD+IFR-AK-CAZ-SC (4) 9,230.32 66.03 119.16 5,186.75 5,116.30 -3,513.28 5,780.07 5,962,292.82 355,266.62 0.26 5,815.62 MWD+IFR-AK-CAZ-SC (4) 9,324.30 66.13 119.24 5,224.85 5,154.40 -3,555.19 5,855.06 5,962,249.41 355,340.75 0.13 5,887.83 MWD+IFR-AK-CAZ-SC (4) 9,417.28 66.00 118.27 5,262.58 5,192.13 -3,596.07 5,929.57 5,962,207.05 355,414.42 0.96 5,958.91 MWD+IFR-AK-CAZ-SC (4) 9,512.16 65.56 116.68 5,301.50 5,231.05 -3,635.99 6,006.33 5,962,165.60 355,490.36 1.60 6,030.19 MWD+IFR-AK-CAZ-SC (4) 9,604.38 65.43 116.53 5,339.75 5,269.30 -3,673.57 6,081.36 5,962,126.53 355,564.62 0.20 6,098.60 MWD+IFR-AK-CAZ-SC (4) 9,700.78 65.87 116.73 5,379.50 5,309.05 -3,712.94 6,159.87 5,962,085.60 355,642.31 0.49 6,170.21 MWD+IFR-AK-CAZ-SC(4) 9,793.87 65.46 118.06 5,417.86 5,347.41 -3,751.96 6,235.17 5,962,045.08 355,716.82 1.37 6,240.02 MWD+IFR-AK-CAZ-SC (4) 9,888.80 65.62 119.96 5,457.17 5,386.72 -3,793.87 6,310.74 5,962,001.67 355,791.52 1.83 6,312.50 MWD+IFR-AK-CAZ-SC (4) 9,982.62 66.04 120.86 5,495.58 5,425.13 -3,837.19 6,384.55 5,961,956.88 355,864.45 0.98 6,385.41 MWD+IFR-AK-CAZ-SC (4) 10,076.49 66.01 121.88 5,533.73 5,463.28 -3,881.84 6,457.79 5,961,910.78 355,936.77 0.99 6,459.21 MWD+IFR-AK-CAZ-SC (4) 10,169.41 66.16 122.87 5,571.40 5,500.95 -3,927.32 6,529.52 5,961,863.87 356,007.57 0.99 6,533.05 MWD+IFR-AK-CAZ-SC (4) 10,264.29 66.04 123.77 5,609.84 5,539.39 -3,974.97 6,602.01 5,961,814.78 356,079.08 0.88 6,609.15 MWD+IFR-AK-CAZ-SC (4) 10,358.35 66.03 124.16 5,648.04 5,577.59 -4,022.99 6,673.29 5,961,765.34 356,149.39 0.38 6,685.01 MWD+IFR-AK-CAZ-SC(4) 10,451.09 65.99 122.80 5,685.75 5,615.30 A,069.73 6,743.96 5,961,717.20 356,219.10 1.34 6,759.46 MWD+IFR-AK-CAZ-SC (4) 10,544.91 65.53 122.64 5,724.27 5,653.82 -4,115.97 6,815.94 5,961,669.53 356,290.13 0.51 6,834.08 MWD+IFR-AK-CAZ-SC (4) 10,639.55 65.46 121.68 5,763.52 5,693.07 -4,161.81 6,888.84 5,961,622.25 356,362.09 0.93 6,908.77 MWD+IFR-AK-CAZ-SC (4) 10,734.25 65.31 120.97 5,802.97 5,732.52 A,206.57 6,962.38 5,961,576.03 356,434.72 0.70 6,982.82 MWD+IFR-AK-CAZ-SC (4) 10,828.68 65.51 121.04 5,842.26 5,771.81 A,250.80 7,035.98 5,961,530.33 356,507.41 0.22 7,056.43 MWD+IFR-AK-CAZ-SC (4) 10,923.35 65.44 120.29 5,881.56 5,811.11 -4,294.73 7,110.06 5,961,484.93 356,580.59 0.72 7,129.99 MWD+IFR-AK-CAZ-SC (4) 11,018.15 65.38 119.51 5,921.01 5,850.56 -4,337.70 7,184.79 5,961,440.48 356,654.44 0.75 7,203.02 MWD+IFR-AK-CAZ-SC (4) 11,111.02 65.37 119.39 5,959.71 5,889.26 A,379.21 7,258.31 5,961,397.51 356,727.10 0.12 7,274.18 MWD+IFR-AK-CAZ-SC (4) 11,204.74 65.57 118.45 5,998.62 5,928.17 A,420.44 7,332.93 5,961,354.79 356,800.88 0.94 7,345.62 MWD+IFR-AK-CAZ-SC (4) 1215/2016 10 4520AM Page 5 COMPASS 5000.1 BUW 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E! -W Northing Easting DLS Section (usft) (a) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tnu1 Name 11,298.23 65.56 117.64 6,037.29 5,966.84 -4,460.46 7,408.05 5,961,313.28 356,875.18 0.79 7,416.22 MWD+IFR-AK-CAZ-SC (4) 11,392.12 65.57 117.93 6,076.13 6,005.68 -4,500.30 7,483.68 5,961,271.93 356,949.99 0.28 7,486.91 MWD+IFR-AK-CAZ-SC (4) 11,484.54 65.30 118.06 6,114.55 6,044.10 -4,539.76 7,557.90 5,961,231.00 357,023.39 0.32 7,556.59 MWD+IFR-AK-CAZ-SC (4) 11,577.92 65.64 117.98 6,153.32 6,082.87 -4,579.67 7,632.89 5,961,189.60 357,097.57 0.37 7,627.03 MWD+IFR-AK-CAZ-SC (4) 11,673.36 65.52 117.73 6,192.78 6,122.33 -4,620.27 7,709.73 5,961,147.47 357,173.57 0.27 7,698.95 MWD+IFR-AK-CAZ-SC (4) 11,765.10 65.57 118.48 6,230.75 6,160.30 -4,659.61 7,783.39 5,961,106.66 357,246.42 0.75 7,768.27 MWD+IFR-AK-CAZ-SC (4) 11,860.16 65.60 119.08 6,270.05 6,199.60 -4,701.28 7,859.25 5,961,063.48 357,321.43 0.58 7,840.68 MWD+IFR-AK-CAZ-SC (4) 11,952.38 65.50 118.87 6,308.22 6,237.77 -4,741.95 7,932.70 5,961,021.35 357,394.04 0.23 7,911.07 MWD+IFR-AK-CAZ-SC (4) 12,046.87 65.51 118.68 6,347.39 6,276.94 -4,783.34 8,008.06 5,960,978.46 357,468.55 0.18 7,983.00 MWD+IFR-AK-CAZ-SC (4) 12,139.12 65.56 118.79 6,385.60 6,315.15 -4,823.71 8,081.69 5,960,936.63 357,541.35 0.12 8,053.21 MWD+IFR-AK-CAZ-SC (4) 12,233.31 66.14 118.41 6,424.13 6,353.68 4,864.85 8,157.15 5,960,893.99 357,615.97 0.72 8,124.96 MWD+IFR-AK-CAZ-SC (4) 12,326.43 66.07 118.07 6,461.85 6,391.40 4,905.14 8,232.15 5,960,852.21 357,690.14 0.34 8,195.74 MWD+IFR-AK-CAZ-SC (4) 12,422.58 66.04 117.55 6,500.88 6,430.43 4,946.13 8,309.88 5,960,809.67 357,767.03 0.50 8,268.43 MWD+IFR-AK-CAZ-SC (4) 12,516.13 66.01 117.75 6,538.89 6,468.44 4,985.80 8,385.60 5,960,768.50 357,841.93 0.20 8,339.00 MWD+IFR-AK-CAZ-SC (4) 12,610.15 65.95 117.93 6,577.16 6,506.71 -5,025.91 8,461.53 5,960,726.88 357,917.04 0.19 8,410.06 MWD+IFR-AK-CAZ-SC (4) 12,704.01 65.91 118.06 6,615.44 6,544.99 -5,066.13 8,537.21 5,960,685.15 357,991.89 0.13 8,481.10 MWD+IFR-AK-CAZ-SC (4) 12,797.27 65.94 117.44 6,653.49 6,583.04 -5,105.78 8,612.56 5,960,644.00 358,066.42 0.61 8,551.49 MWD+IFR-AK-CAZ-SC (4) 12,889.72 66.07 117.82 6,691.08 6,620.63 -5,144.95 8,687.39 5,960,603.35 358,140.45 0.40 8,621.20 MWD+IFR-AK-CAZ-SC (4) 12,984.74 66.11 117.20 6,729.59 6,659.14 -5,185.07 8,764.43 5,960,561.69 358,216.67 0.60 8,692.80 MWD+IFR-AK-CAZ-SC (4) 13,078.29 65.60 117.77 6,767.86 6,697.41 -5,224.47 8,840.16 5,960,520.79 358,291.59 0.78 8,763.14 MWD+IFR-AK-CAZ-SC (4) 13,171.16 65.52 118.60 6,806.28 6,735.83 -5,264.40 8,914.68 5,960,479.37 358,365.29 0.82 8,833.38 MWD+IFR-AK-CAZ-SC (4) 13,266.22 65.86 119.22 6,845.42 6,774.97 -5,306.28 8,990.52 5,960,435.98 358,440.26 0.69 8,905.96 MWD+IFR-AK-CAZ-SC (4) 13,359.66 65.96 118.69 6,883.56 6,813.11 -5,347.58 9,065.16 5,960,393.20 358,514.05 0.53 8,977.46 MWD+IFR-AK-CAZ-SC (4) 13,453.44 65.63 117.83 6,922.01 6,851.56 -5,388.08 9,140.50 5,960,351.21 358,588.56 0.91 9,048.59 MWD+IFR-AK-CAZ-SC (4) 13,547.24 65.50 119.12 6,960.81 6,890.36 -5,428.79 9,215.56 5,960,309.00 358,662.79 1.26 9,119.78 MWD+IFR-AK-CAZ-SC (4) 13,641.15 65.47 119.07 6,999.78 6,929.33 -5,470.34 9,290.22 5,960,265.97 358,736.60 0.06 9,191.52 MWD+IFR-AK-CAZ-SC (4) 13,734.37 65.54 118.83 7,038.43 6,967.98 -5,511.40 9,364.45 5,960,223.43 358,809.99 0.25 9,262.62 MWD+IFR-AK-CAZ-SC (4) 13,827.74 65.28 117.91 7,077.28 7,006.83 -5,551.74 9,439.16 5,960,181.60 358,883.86 0.94 9,333.31 MWD+IFR-AK-CAZ-SC (4) 13,921.59 65.19 118.28 7,116.60 7,046.15 -5,591.88 9,514.33 5,960,139.97 358,958.21 0.37 9,404.04 MWD+IFR-AK-CAZ-SC (4) 14,014.98 65.22 117.72 7,155.76 7,085.31 -5,631.68 9,589.19 5,960,098.68 359,032.25 0.55 9,474.33 MWD+IFR-AK-CAZ-SC (4) 14,109.07 65.26 118.12 7,195.17 7,124.72 -5,671.68 9,664.69 5,960,057.18 359,106.92 0.39 9,545.09 MWD+IFR-AK-CAZ-SC (4) 14,202.98 65.22 117.93 7,234.50 7,164.05 -5,711.75 9,739.96 5,960,015.61 359,181.38 0.19 9,615.81 MWD+IFR-AK-CAZ-SC (4) 14,296.25 65.75 118.61 7,273.20 7,202.75 -5,751.94 9,814.70 5,959,973.93 359,255.29 0.87 9,686.39 MWD+IFR-AK-CAZ-SC (4) 14,389.83 66.77 119.72 7,310.87 7,240.42 -5,793.69 9,889.50 5,959,930.70 359,329.23 1.54 9,758.36 MWD+IFR-AK-CAZ-SC (4) 14,483.30 68.61 119.67 7,346.36 7,275.91 -5,836.53 9,964.61 5,959,886.37 359,403.47 1.97 9,831.45 MWD+IFR-AK-CAZ-SC (4) 14,577.19 70.60 119.61 7,379.07 7,308.62 -5,880.05 10,041.10 5,959,841.33 359,479.06 2.12 9,905.78 MWD+IFR-AK-CAZ-SC (4) 14,671.64 74.36 118.47 7,407.50 7,337.05 -5,923.75 10,119.83 5,959,796.06 359,556.90 4.14 9,981.34 MWD+IFR-AK-CAZ-SC (4) 14,766.17 76.79 117.86 7,431.05 7,360.60 -5,966.96 10,200.54 5,959,751.25 359,636.71 2.65 10,057.37 MWD+IFR-AK-CAZ-SC (4) 14,858.93 79.19 118.06 7,450.35 7,379.90 -6,009.49 10,280.67 5,959,707.12 359,715.97 2.60 10,132.55 MWD+IFR-AK-CAZ-SC (4) 14,953.15 79.58 118.16 7,467.71 7,397.26 -6,053.13 10,362.35 5,959,661.86 359,796.76 0.43 10,209.43 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10.45:20AM Page 6 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey 12/5/2016 10 45:20AM Page 7 COMPASS 5000 1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) V) ('? (usft) (usft) (usft) (usft) (ft) (ft) (%100') (ft) Survey Toot Name 15,046.95 79.69 119.36 7,484.58 7,414.13 -6,097.52 10,443.24 5,959,615.86 359,876.73 1.26 10286.60 MWD+IFR-AK-CAZ-SC (4) Tie On 15,046.96 79.69 119.36 7,484.59 7,414.14 -6,097.53 10,443.25 5,959,615.85 359,876.74 0.00 10,286.60 INC+TREND (5) 7518" x 9-7/8" by 1T" 15,079.88 79.52 119.20 7,490.53 7,420.08 -6,113.36 10,471.49 5,959,599.45 359,904.66 0.70 10,313.85 INC+TREND(5) 15,121.00 79.00 119.00 7,498.19 7,427.74 -6,133.01 10,506.79 5,959,579.10 359,939.55 1.35 10,347.77 INC+TREND (5) 15,134.00 80.81 118.00 7,500.47 7,430.02 -6,139.12 10,518.04 5,959,572.77 359,950.68 15.85 10,358.44 INC+TREND (5) 15,175.19 78.17 117.51 7,507.98 7,437.53 -6,157.98 10,553.87 5,959,553.20 359,986.12 6.52 10,391.91 INC+TREND (5) 15,268.80 81.23 116.39 7,524.72 7,454.27 -6,199.71 10,635.96 5,959,509.84 360,067.36 3.47 10,467.30 INC+TREND (5) 15,364.69 86.68 116.23 7,534.81 7,464.36 -6,241.96 10,721.41 5,959,465.89 360,151.93 5.69 10,544.72 MWD+IFR-AK-CAZ-SC (6) 15,458.69 90.12 116.56 7,537.43 7,466.98 -6,283.72 10,805.57 5,959,422.45 360,235.23 3.68 10,621.10 MWD+IFR-AK-CAZ-SC (6) 15,554.98 93.24 115.03 7,534.61 7,464.16 -6,325.60 10,892.21 5,959,378.85 360,321.01 3.61 10,698.76 MWD+IFR-AK-CAZ-SC (6) 15,649.60 94.38 116.19 7,528.32 7,457.87 -6,366.41 10,977.34 5,959,336.34 360,405.30 1.72 10,774.75 MWD+IFR-AK-CAZ-SC (6) 15,744.86 93.48 118.58 7,521.79 7,451.34 -6,410.12 11,061.72 5,959,290.96 360,488.78 2.68 10,852.96 MWD+IFR-AK-CAZ-SC (6) 15,840.89 92.79 123.32 7,516.54 7,446.09 -6,459.42 11,143.93 5,959,240.02 360,569.98 4.98 10,935.08 MWD+IFR-AK-CAZ-SC (6) 15,935.97 93.62 124.25 7,511.22 7,440.77 -6,512.20 11,222.83 5,959,185.67 360,647.80 1.31 11,018.73 MWD+IFR-AK-CAZ-SC (6) 16,030.71 93.17 127.15 7,505.61 7,435.16 -6,567.39 11,299.62 5,959,128.96 360,723.47 3.09 11,103.51 MWD+IFR-AK-CAZ-SC (6) 16,126.02 93.03 128.90 7,500.46 7,430.01 -6,626.01 11,374.59 5,959,068.85 360,797.24 1.84 11,190.47 MWD+IFR-AK-CAZ-SC (6) 16,220.66 93.45 130.63 7,495.11 7,424.66 -6,686.45 11,447.22 5,959,006.98 360,868.63 1.88 11,277.92 MWD+IFR-AK-CAZ-SC (6) 16,315.67 92.73 131.78 7,489.99 7,419.54 -6,748.94 11,518.59 5,958,943.07 360,938.74 1.43 11,366.61 MWD+IFR-AK-CAZ-SC (6) 16,410.39 88.81 134.68 7,488.71 7,418.26 -6,813.79 11,587.58 5,958,876.85 361,006.41 5.15 11,456.26 MWD+IFR-AK-CAZ-SC (6) 16,504.91 90.77 140.12 7,489.06 7,418.61 -6,883.34 11,651.53 5,958,806.05 361,068.95 6.12 11,547.69 MWD+IFR-AK-CAZ-SC (6) 16,600.31 88.50 142.05 7,489.67 7,419.22 -6,957.56 11,711.45 5,958,730.65 361,127.36 3.12 11,641.35 MWD+IFR-AK-CAZ-SC (6) 16,696.15 90.12 145.67 7,490.82 7,420.37 -7,034.94 11,767.96 5,958,652.16 361,182.30 4.14 11,736.20 MWD+IFR-AK-CAZ-SC (6) 16,760.35 90.67 146.89 7,490.38 7,419.93 -7,088.33 11,803.59 5,958,598.06 361,216.86 2.08 11,800.08 MWD+IFR-AK-CAZ-SC (6) 16,821.00 90.67 146.89 7,489.67 7,419.22 -7,139.13 11,836.72 5,958,546.61 361,248.96 0.00 11,860.48 PROJECTED to TD 12/5/2016 10 45:20AM Page 7 COMPASS 5000 1 Build 74 r Az. Cement Detail Report CD5-99 String: Conductor Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Conductor Cement Cementing Start Date 4/17/2016 06:00 Cementing End Date 4/17/2016 08:00 Wellbore Name CD5-99A Comment Cement Stages Stage # 1 Description Conductor Cement Objective 1 Top Depth (ftKB) 36.6 Bottom Depth (ftKB) 115.0 Full Return? No Vol Cement... Top Plug? No Btm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi)P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft' /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 12/27/2016 s4 rt Cement Detail Report CDS-99 String: Surface Casing Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Surface Casing Cement 8/30/2016 13:00 8/30/2016 16:00 CD5-99A Comment Cemented with full returns. 165 bbls good cement to surface. Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... I Top Plug? Btm Plug? Surface Casing Cement I i 36.6 2,337.1 Yes 165.0 Yes Yes Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 8 3 6 420.0 950.0 Yes 8.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Lead Cement 36.6 1,837.0 846 LiteCRETE 288.0 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) 1.91 6.79 0.00 11.00 220.0 5.50 50.0 Additives Additive Type Concentration Cone Unit label D046 0.2 %BWOC Additive Type Concentration Cone Unit label D167 0.5 %BWOC Additive Type Concentration Cone Unit label D185 0.06 gal/sx Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Tail Cement 1,837.0 2,337.1 240 G 50.5 Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.09 0.00 15.80 102.0 5.00 200.0 Additives Additive Type Concentration Cone Unit label D046 0.2 %BWOC Additive Type Concentration Cone Unit label D065 0.3 %BWOC Additive Type Concentration Cone Unit label D167 0.4 %BWOC Page 1/1 Report Printed: 12/27/2016 Cement Detail Report CD5-99 String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 8/27/2016 00:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 10/13/2016 09:00 10/13/201615:00 CD5-99A Comment Cemented with full returns Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing13,854.0 15,570.6 Yes Yes Yes Cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 7 580.0 670.0 No I I No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Flood lines with water, test lines to 3800 psi. SLB pumped 41 bbl of 12.5 ppg Mud Push II. Drop bottom plug. SLB pumped 154.5 bbl of 15.8 ppg cement. Drop top plug. SLB kick out with 20 bbl water, rig displaced with 6892 strokes to bump plug (694 bbl). CIP @ 11:50 hrs, no losses. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 15.8 ppg Class G 13,854.0 15,570.6 734 G 154.5 intermediate cement Yield (ft/sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.07 0.00 15.80 128.0 0.00 500.0 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Additive Type Concentration Conc Unit label Retarder ID177 0.02 gal/sx Stage # 2 Description Objective Top Depth (ftK6) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing5,958.0 6,708.0 Yes Yes No Cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 8 7 360.0 760.0 No No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) 6,707.0 PDC bit 6,711.5 63/4 Comment Peform 2nd stage cement job. Flood cement lines, pressure test to 3000 psi. SLB pumped 42 bbl 12.5 ppg MudPush II, 65 bbl 15.8 ppg cement. Drop closing plug. SLB kick out with 20.2 bbl water, rig displaced with 2867 stks (288 bbl). Bumped plug and pressure up to 1900 psi, held 5 minutes. Bleed pressure and check floats - good. CIP @ 14:34 hrs. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 15.8 ppg Class G 5,958.0 6,708.0 311 G 41.9 intermediate cement Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (Pa -s) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.09 0.00 15.80 162.0 0.00 500.0 Additives Additive Type Concentration Conc Unit label Antifoam D046 0.2 %BWOC Additive Type Concentration Conc Unit label Dispersant D065 0.3 %BWOC Additive Type Concentration Conc Unit label Fluid Loss Control D167 0.4 %BWOC Page 1/1 Report Printed: 12/27/2016 RECEIVk- DEC 0 8 20(p SchlumbepUep Drilling & Measurements MWD/LWD Log Product Delivery Customer: ConocoPhillips Alaska Dispatched To: Well No: CD5-99AL1 Date Dispatched Job#: 16AKA0116 Dispatched By: 21 6124 27 79 7 Transmittal #: 07DEC16-SP03 DATA LOGGED Q-/ W/201(p wi K BENDER AOGCC: Makana Bender 7 -Dec -16 Stephanie Pacillo Well / Product Hardcopy Digital Copy E -Delivery Date Color Log Prints: 4 Contents on CD N/A Scope Resistivity 2" MD 2° ND x x x x x x x Scope Resistivity Scope Resistivity 5" MD Scope Resistivity _ 5" ND x LAS Digital Data N/A Contents on CD x Directional Data 1 Contents on CD Na -d27 x As -Built Survey 1 Contents on CD Nad83 x EOW CD 1 Contents on CD Data: DLIS /ASCII x x Graphics: pdf Survey: pdf/ txt x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkamp((Dconocophillips.com AlaskaPTSPrintCenter(a)slb.com Attn: Tom Osterkamp Attn: Stephanie Pacillo 907-263-4795 Received By: 21 6124 27 79 7 RECEIVED DEC 08 2016 , OGG FINAL NADConversion Western North Slope CD5 Alpine West Pad CD5-99AL1 CD5-99AL1 Definitive Survey Report 05 December, 2016 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-99 Audit Notes: Well Position +Nl-S 0.00 usft Northing: 5,965,920.93 usft Latitude: 70° 18'50.421 N ACTUAL +E/ -W 0.00 usft Easting: 349,558.53 usft Longitude: 151° 13' 9.507 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft 572.96 36.55 0.00 0.00 152.00 8/28/2016 11:55:' Wellbore CD5-99AL1 INC+TREND Inclinometer + known azi trend 10/1/2016 11:11: Magnetics Model Name Sample Date Declination Dip Angle Field Strength 15,079.88 15,268.80 CD5-99AL1 Svyl - SLB_Inc+Filler (CD5- INC+TREND (1) (1) (nT) 15,364.69 BG GM2016 11/2/2016 17.47 80.81 57,509 0.35 80.47 100.00 29.55 0.03 Design CD5-99AL1 Date Audit Notes: From To Map Version: 1.0 Phase: ACTUAL Tie On Depth: 15,046.95 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction 500.00 CD5-99 Svyl - SLB_NSG-SSHOT (CD5- (usft) (usft) (usft) (1) 572.96 36.55 0.00 0.00 152.00 Survey Program Date From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 100.00 500.00 CD5-99 Svyl - SLB_NSG-SSHOT (CD5- GYD-GC-SS Gyrodata gyro single shots 8128/2016 11:46: 572.96 2,270.51 CD5-99 Svy2 - SLB_MWD_GMAG (CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/28/2016 11:55:' 2,354.63 2,354.63 CD5-99A Svyl - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer + known azi trend 10/1/2016 11:11: 2,400.38 15,046.95 CD5-99A Svy2 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/1/2016 11:23: 15,079.88 15,268.80 CD5-99AL1 Svyl - SLB_Inc+Filler (CD5- INC+TREND Inclinometer+ known azi trend 11/5/2016 6:23:1 15,364.69 16,760.35 CD5-99AL1 Svy2 - SLB_MWD+GMAG (C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 11/5/2016 6:32:1 Survey 12/5/2016 10:45:20AM Page 2 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (`) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.90 0.00 0.00 5,965,920.93 349,558.53 0.00 0.00 UNDEFINED 100.00 0.35 80.47 100.00 29.55 0.03 0.19 5,965,920.96 349,558.72 0.55 0.06 GYD-GC-SS (1) 200.00 0.30 136.60 200.00 129.55 -0.11 0.67 5,965,920.81 349,559.20 0.31 0.41 GYD-GC-SS (1) 300.00 0.42 180.43 300.00 229.55 -0.66 0.85 5,965,920.25 349,559.36 0.29 0.99 GYD-GC-SS (1) 400.00 1.46 178.92 399.98 329.53 -2.30 0.87 5,965,918.61 349,559.35 1.04 2.44 GYD-GC-SS (1) 500.00 2.50 174.40 499.92 429.47 -5.75 1.11 5,965,915.16 349,559.52 1.05 5.60 GYD-GC-SS (1) 572.96 2.84 173.07 572.80 502.35 -9.13 1.48 5,965,911.78 349,559.83 0.47 8.75 MWD+IFR-AK-CAZ-SC (2) 659.55 3.53 165.66 659.26 588.81 -13.84 2.40 5,965,907.05 349,560.65 0.93 13.35 MWD+IFR-AK-CAZ-SC (2) 751.03 4.95 165.13 750.48 680.03 -20.38 4.11 5,965,900.47 349,562.23 1.55 19.93 MWD+IFR-AK-CAZ-SC (2) 845.81 7.79 162.16 844.67 774.22 -30.45 7.13 5,965,890.35 349,565.04 3.02 30.23 MWD+IFR-AK-CAZ-SC (2) 12/5/2016 10:45:20AM Page 2 COMPASS 5000.1 Build 74 SLB Definitive Survey Repoli Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (1) V) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 940.37 11.22 158.66 937.92 867.47 -45.12 12.44 5,965,875.57 349,570.06 3.68 45.68 MWD+IFR-AK-CAZ-SC (2) 1,034.58 13.28 155.03 1,029.98 959.53 -63.47 20.34 5,965,857.07 349,577.60 2.33 65.60 MWD+IFR-AK-CAZ-SC (2) 1,129.57 14.30 153.79 1,122.23 1,051.78 -83.89 30.13 5,965,836.46 349,586.97 1.12 88.22 MWD+IFR-AK-CAZ-SC (2) 1,222.50 14.94 150.97 1,212.15 1,141.70 -104.66 41.01 5,965,815.48 349,597.43 1.03 111.66 MWD+IFR-AK-CAZ-SC (2) 1,317.05 15.53 150.01 1,303.38 1,232.93 -126.28 53.26 5,965,793.62 349,609.24 0.68 136.50 MWD+IFR-AK-CAZ-SC (2) 1,410.15 17.57 146.48 1,392.62 1,322.17 -148.79 67.25 5,965,770.83 349,622.78 2.44 162.95 MWD+IFR-AK-CAZ-SC (2) 1,506.38 21.17 141.10 1,483.40 1,412.95 -174.44 86.19 5,965,744.82 349,641.20 4.17 194.48 MWD+IFR-AK-CAZ-SC (2) 1,600.00 23.81 137.20 1,569.89 1,499.44 -201.46 109.65 5,965,717.33 349,664.11 3.24 229.36 MWD+IFR-AK-CAZ-SC (2) 1,694.62 26.66 133.78 1,655.48 1,585.03 -230.17 137.96 5,965,688.06 349,691.84 3.38 268.00 MWD+IFR-AK-CAZ-SC (2) 1,788.88 29.81 132.16 1,738.51 1,668.06 -260.54 170.60 5,965,657.05 349,723.86 3.44 310.13 MWD+IFR-AK-CAZ-SC (2) 1,882.95 32.44 130.76 1,819.04 1,748.59 -292.71 207.05 5,965,624.15 349,759.66 2.90 355.65 MWD+IFR-AK-CAZ-SC (2) 1,976.79 33.94 130.25 1,897.56 1,827.11 -326.07 246.11 5,965,590.02 349,798.04 1.63 403.45 MWD+IFR-AK-CAZ-SC (2) 2,070.83 35.82 129.12 1,974.71 1,904.26 -360.40 287.50 5,965,554.87 349,638.73 2.11 453.19 MWD+IFR-AK-CAZ-SC (2) 2,165.49 37.79 127.90 2,050.50 1,980.05 -395.70 331.88 5,965,518.69 349,882.39 2.22 505.19 MWD+IFR-AK-CAZ-SC (2) 2,259.49 40.14 127.23 2,123.58 2,053.13 -431.72 378.74 5,965,481.74 349,928.52 2.54 559.00 MWD+IFR-AK-CAZ-SC (2) 2,270.51 40.86 126.48 2,131.96 2,061.51 -436.02 384.47 5,965,477.33 349,934.15 7.89 565.48 MWD+IFR-AK-CAZ-SC (2) 10-3/4" x 13-1/2" 2,400.38 38.27 124.71 2,231.85 2,161.40 -484.34 451.91 5,965,427.67 350,000.61 2.79 639.81 MWD+IFR-AK-CAZ-SC (4) 2,449.55 39.97 124.54 2,270.00 2,199.55 -501.97 477.44 5,965,409.54 350,025.78 3.46 667.35 MWD+IFR-AK-CAZ-SC (4) 2,496.41 42.85 122.76 2,305.14 2,234.69 -519.13 503.25 5,965,391.87 350,051.24 6.64 694.62 MWD+IFR-AK-CAZ-SC (4) 2,543.50 45.60 122.60 2,338.88 2,268.43 -536.86 530.89 5,965,373.59 350,078.52 5.84 723.25 MWD+IFR-AK-CAZ-SC (4) 2,590.10 47.02 122.20 2,371.07 2,300.62 -554.91 559.34 5,965,354.97 350,106.60 3.11 752.55 MWD+IFR-AK-CAZ-SC (4) 2,638.47 48.78 121.65 2,403.50 2,333.05 -573.89 589.80 5,965,335.39 350,136.67 3.74 783.61 MWD+IFR-AK-CAZ-SC (4) 2,685.65 50.29 121.67 2,434.12 2,363.67 -592.73 620.35 5,965,315.94 350,166.83 3.20 814.58 MWD+IFR-AK-CAZ-SC (4) 2,733.47 52.01 121.23 2,464.11 2,393.66 -612.15 652.12 5,965,295.88 350,198.21 3.67 846.65 MWD+IFR-AK-CAZ-SC (4) 2,781.44 53.64 120.35 2,493.10 2,422.65 -631.72 684.96 5,965,275.66 350,230.64 3.70 879.34 MWD+IFR-AK-CAZ-SC (4) 2,827.79 55.19 120.21 2,520.07 2,449.62 -650.72 717.51 5,965,256.01 350,262.80 3.35 911.40 MWD+IFR-AK-CAZ-SC (4) 2,873.78 56.60 120.81 2,545.86 2,475.41 -670.06 750.31 5,965,236.03 350,295.21 3.25 943.88 MWD+IFR-AK-CAZ-SC (4) 2,921.08 57.79 121.21 2,571.48 2,501.03 -690.54 784.39 5,965,214.87 350,328.86 2.61 977.96 MWD+IFR-AK-CAZ-SC (4) 3,016.32 59.97 123.67 2,620.71 2,550.26 -734.28 853.17 5,965,169.76 350,396.76 3.18 1,048.87 MWD+IFR-AK-CAZ-SC (4) 3,061.84 61.29 123.58 2,643.03 2,572.58 -756.25 886.21 5,965,147.13 350,429.34 2.90 1,083.78 MWD+IFR-AK-CAZ-SC (4) 3,111.30 62.67 123.84 2,666.27 2,595.82 -780.48 922.53 5,965,122.18 350,465.16 2.83 1,122.22 MWD+IFR-AK-CAZ-SC (4) 3,157.34 64.23 123.66 2,686.85 2,616.40 -803.36 956.77 5,965,098.62 350,498.94 3.41 1,158.50 MWD+IFR-AK-CAZ-SC (4) 3,203.86 65.52 123.31 2,706.60 2,636.15 -826.60 991.90 5,965,074.69 350,533.59 2.86 1,195.51 MWD+IFR-AK-CAZ-SC (4) 3,299.05 65.99 123.09 2,745.69 2,675.24 -874.12 1,064.52 5,965,025.72 350,605.24 0.54 1,271.57 MWD+IFR-AK-CAZ-SC (4) 3,392.96 66.08 122.52 2,783.83 2,713.38 -920.62 1,136.65 5,964,977.80 350,676.42 0.56 1,346.48 MWD+IFR-AK-CAZ-SC (4) 3,487.44 65.97 122.70 2,822.22 2,751.77 -967.14 1,209.37 5,964,929.83 350,748.19 0.21 1,421.70 MWD+IFR-AK-CAZ-SC (4) 3,583.78 66.02 122.64 2,861.42 2,790.97 -1,014.65 1,283.45 5,964,880.85 350,821.30 0.08 1,498.42 MWD+IFR-AK-CAZ-SC (4) 3,677.93 66.02 121.78 2,899.68 2,829.23 -1,060.50 1,356.24 5,964,833.55 350,893.15 0.83 1,573.08 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10:45:20AM Page 3 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc AzI TVD TVDSS +N/ -S +E/ -W Northing Easting US Section (usft) (°) V) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 3,770.86 66.02 121.62 2,937.45 2,867.00 -1,105.12 1,428.48 5,964,787.50 350,964.47 0.16 1,646.39 MWD+IFR-AK-CAZ-SC (4) 3,865.49 66.11 120.21 2,975.84 2,905.39 -1,149.55 1,502.68 5,964,741.59 351,037.77 1.37 1,720.46 MWD+IFR-AK-CAZ-SC (4) 3,959.41 66.09 119.23 3,013.89 2,943.44 -1,192.12 1,577.25 5,964,697.54 351,111.46 0.95 1,793.05 MWD+IFR-AK-CAZ-SC(4) 4,054.40 66.09 119.90 3,052.39 2,981.94 -1,234.97 1,652.78 5,964,653.19 351,186.11 0.64 1,866.34 MWD+IFR-AK-CAZ-SC (4) 4,147.49 66.12 119.78 3,090.10 3,019.65 -1,277.32 1,726.61 5,964,609.37 351,259.07 0.12 1,938.40 MWD+IFR-AK-CAZ-SC (4) 4,242.73 65.49 119.45 3,129.13 3,058.68 -1,320.25 1,802.13 5,964,564.94 351,333.72 0.73 2,011.76 MWD+IFR-AK-CAZ-SC (4) 4,337.15 65.55 118.48 3,168.26 3,097.81 -1,361.86 1,877.32 5,964,521.83 351,408.04 0.94 2,083.80 MWD+IFR-AK-CAZ-SC (4) 4,430.83 65.43 119.60 3,207.12 3,136.67 -1,403.23 1,951.84 5,964,478.98 351,481.72 1.10 2,155.32 MWD+IFR-AK-CAZ-SC (4) 4,526.10 65.57 119.96 3,246.63 3,176.18 -1,446.29 2,027.08 5,964,434.42 351,556.07 0.37 2,228.66 MWD+IFR-AK-CAZ-SC (4) 4,619.67 65.37 119.87 3,285.48 3,215.03 -1,488.75 2,100.86 5,964,390.50 351,628.99 0.23 2,300.78 MWD+IFR-AK-CAZ-SC (4) 4,714.13 65.56 118.38 3,324.71 3,254.26 -1,530.57 2,175.93 5,964,347.19 351,703.19 1.45 2,372.95 MWD+IFR-AK-CAZ-SC (4) 4,809.66 65.41 118.91 3,364.34 3,293.89 -1,572.23 2,252.21 5,964,304.01 351,778.62 0.53 2,445.55 MWD+IFR-AK-CAZ-SC (4) 4,903.76 65.46 118.93 3,403.46 3,333.01 -1,613.62 2,327.12 5,964,261.13 351,852.68 0.06 2,517.26 MWD+IFR-AK-CAZ-SC (4) 4,997.13 65.61 118.54 3,442.13 3,371.68 -1,654.48 2,401.64 5,964,218.79 351,926.36 0.41 2,588.32 MWD+IFR-AK-CAZ-SC (4) 5,091.58 65.85 118.35 3,480.95 3,410.50 -1,695.49 2,477.35 5,964,176.27 352,001.22 0.31 2,660.07 MWD+IFR-AK-CAZ-SC (4) 5,186.76 65.98 118.27 3,519.80 3,449.35 -1,736.70 2,553.85 5,964,133.54 352,076.88 0.16 2,732.37 MWD+IFR-AK-CAZ-SC (4) 5,279.36 65.94 118.31 3,557.52 3,487.07 -1,776.78 2,628.31 5,964,091.98 352,150.52 0.06 2,802.72 MWD+IFR-AK-CAZ-SC (4) 5,375.09 65.80 118.22 3,596.65 3,526.20 -1,818.15 2,705.26 5,964,049.08 352,226.62 0.17 2,875.37 MWD+IFR-AK-CAZ-SC (4) 5,469.64 65.82 118.03 3,635.40 3,564.95 -1,858.81 2,781.33 5,964,006.91 352,301.85 0.18 2,946.98 MWD+IFR-AK-CAZ-SC (4) 5,562.68 65.72 118.69 3,673.58 3,603.13 -1,899.11 2,855.99 5,963,965.13 352,375.68 0.66 3,017.62 MWD+IFR-AK-CAZ-SC (4) 5,656.11 65.52 118.69 3,712.15 3,641.70 -1,939.96 2,930.64 5,963,922.79 352,449.49 0.21 3,088.73 MWD+IFR-AK-CAZ-SC (4) 5,751.20 65.37 118.51 3,751.66 3,681.21 -1,981.36 3,006.57 5,963,879.88 352,524.58 0.23 3,160.94 MWD+IFR-AK-CAZ-SC (4) 5,845.38 65.39 117.03 3,790.90 3,720.45 -2,021.25 3,082.33 5,963,838.48 352,599.51 1.43 3,231.73 MWD+IFR-AK-CAZ-SC (4) 5,939.38 65.59 116.84 3,829.90 3,759.45 -2,060.00 3,158.58 5,963,798.22 352,674.97 0.28 3,301.73 MWD+IFR-AK-CAZ-SC (4) 6,033.53 65.51 117.08 3,868.87 3,798.42 -2,098.85 3,234.97 5,963,757.84 352,750.56 0.25 3,371.90 MWD+IFR-AK-CAZ-SC (4) 6,127.05 65.97 117.21 3,907.29 3,836.84 -2,137.75 3,310.84 5,963,717.43 352,825.63 0.51 3,441.87 MWD+IFR-AK-CAZ-SC (4) 6,220.59 66.04 117.69 3,945.33 3,874.88 -2,177.15 3,386.68 5,963,676.53 352,900.65 0.47 3,512.25 MWD+IFR-AK-CAZ-SC (4) 6,315.27 65.97 118.38 3,983.83 3,913.38 -2,217.80 3,463.02 5,963,634.36 352,976.17 0.67 3,583.99 MWD+IFR-AK-CAZ-SC (4) 6,409.67 66.13 118.52 4,022.15 3,951.70 -2,258.90 3,538.88 5,963,591.75 353,051.18 0.22 3,655.89 MWD+IFR-AK-CAZ-SC (4) 6,503.79 66.01 118.96 4,060.33 3,989.88 -2,300.27 3,614.31 5,963,548.88 353,125.76 0.45 3,727.83 MWD+IFR-AK-CAZ-SC (4) 6,597.09 65.42 119.01 4,098.70 4,028.25 -2,341.48 3,688.70 5,963,506.20 353,199.30 0.63 3,799.14 MWD+IFR-AK-CAZ-SC (4) 6,691.36 65.60 118.33 4,137.78 4,067.33 -2,382.63 3,763.97 5,963,463.54 353,273.73 0.68 3,870.82 MWD+IFR-AK-CAZ-SC (4) 6,785.93 65.05 117.50 4,177.26 4,106.81 -2,422.87 3,839.91 5,963,421.80 353,348.84 0.99 3,941.99 MWD+IFR-AK-CAZ-SC (4) 6,880.32 64.95 118.47 4,217.15 4,146.70 -2,463.01 3,915.45 5,963,380.16 353,423.55 0.94 4,012.90 MWD+IFR-AK-CAZ-SC (4) 6,974.08 65.54 119.25 4,256.42 4,185.97 -2,504.10 3,990.02 5,963,337.58 353,497.28 0.98 4,084.19 MWD+IFR-AK-CAZ-SC (4) 7,068.23 65.52 119.63 4,295.41 4,224.96 -2,546.22 4,064.64 5,963,293.97 353,571.04 0.37 4,156.42 MWD+IFR-AK-CAZ-SC (4) 7,163.21 65.53 120.14 4,334.76 4,264.31 -2,589.30 4,139.59 5,963,249.41 353,645.11 0.49 4,229.63. MWD+IFR-AK-CAZ-SC (4) 7,254.95 65.55 119.82 4,372.75 4,302.30 -2,631.02 4,211.93 5,963,206.25 353,716.58 0.32 4,300.44 MWD+IFR-AK-CAZ-SC (4) 7,349.11 65.49 120.15 4,411.77 4,341.32 -2,673.85 4,286.15 5,963,161.94 353,789.93 0.33 4,373.10 MWD+IFR-AK-CAZ-SC (4) 7,443.24 65.53 120.53 4,450.79 4,380.34 -2,717.12 4,360.08 5,963,117.20 353,862.97 0.37 4,446.01 MWD+IFR-AK-CAZ-SC (4) 1215/2016 10 45.20AM Page 4 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,537.81 65.62 121.26 4,489.89 4,419.44 -2,761.33 4,433.97 5,963,071.52 353,935.95 0.71 4,519.74 MWD+IFR-AK-CAZ-SC (4) 7,631.19 65.55 121.92 4,528.49 4,458.04 -2,805.88 4,506.40 5,963,025.54 354,007.47 0.65 4,593.07 MWD+IFR-AK-CAZ-SC (4) 7,723.34 65.59 121.62 4,566.60 4,496.15 -2,850.05 4,577.73 5,962,979.95 354,077.90 0.30 4,665.56 MWD+IFR-AK-CAZ-SC (4) 7,818.15 65.53 121.19 4,605.83 4,535.38 -2,895.03 4,651.40 5,962,933.51 354,150.64 0.42 4,739.85 MWD+IFR-AK-CAZ-SC (4) 7,913.03 65.50 120.34 4,645.15 4,574.70 -2,939.19 4,725.59 5,962,887.87 354,223.93 0.82 4,813.69 MWD+IFR-AK-CAZ-SC (4) 8,006.35 65.49 119.93 4,683.86 4,613.41 -2,981.82 4,799.03 5,962,843.78 354,296.50 0.40 4,885.80 MWD+IFR-AK-CAZ-SC (4) 8,101.59 65.59 118.86 4,723.30 4,652.85 -3,024.37 4,874.56 5,962,799.73 354,371.15 1.03 4,958.83 MWD+IFR-AK-CAZ-SC (4) 8,194.58 65.58 119.13 4,761.73 4,691.28 -3,065.42 4,948.62 5,962,757.21 354,444.37 0.26 5,029.84 MWD+IFR-AK-CAZ-SC (4) 8,290.23 65.53 119.28 4,801.31 4,730.86 -3,107.91 5,024.63 5,962,713.21 354,519.51 0.15 5,103.04 MWD+IFR-AK-CAZ-SC (4) 8,384.19 65.40 119.02 4,840.33 4,769.88 -3,149.54 5,099.28 5,962,670.09 354,593.30 0.29 5,174.85 MWD+IFR-AK-CAZ-SC (4) 8,477.96 65.40 118.57 4,879.37 4,808.92 -3,190.61 5,173.99 5,962,627.54 354,667.17 0.44 5,246.18 MWD+IFR-AK-CAZ-SC (4) 8,571.84 65.43 117.50 4,918.43 4,847.98 -3,230.73 5,249.34 5,962,585.92 354,741.70 1.04 5,316.98 MWD+IFR-AK-CAZ-SC (4) 8,665.25 65.65 116.91 4,957.10 4,886.65 -3,269.60 5,324.96 5,962,545.54 354,816.52 0.62 5,386.81 MWD+IFR-AK-CAZ-SC (4) 8,760.88 65.94 116.99 4,996.31 4,925.86 -3,309.13 5,402.71 5,962,504.46 354,893.46 0.31 5,458.21 MWD+IFR-AK-CAZ-SC (4) 8,855.16 66.00 117.54 5,034.70 4,964.25 -3,348.58 5,479.26 5,962,463.49 354,969.19 0.54 5,528.98 MWD+IFR-AK-CAZ-SC (4) 8,947.50 66.06 118.23 5,072.22 5,001.77 -3,388.04 5,553.83 5,962,422.55 355,042.96 0.69 5,598.83 MWD+IFR-AK-CAZ-SC (4) 9,041.26 66.16 118.79 5,110.19 5,039.74 -3,428.96 5,629.17 5,962,380.13 355,117.45 0.56 5,670.33 MWD+IFR-AK-CAZ-SC (4) 9,135.01 66.13 119.41 5,148.10 5,077.65 -3,470.66 5,704.08 5,962,336.94 355,191.51 0.61 5,742.32 MWD+IFR-AK-CAZ-SC (4) 9,230.32 66.03 119.16 5,186.75 5,116.30 -3,513.28 5,780.07 5,962,292.82 355,266.62 0.26 5,815.62 MWD+IFR-AK-CAZ-SC (4) 9,324.30 66.13 119.24 5,224.85 5,154.40 -3,555.19 5,855.06 5,962,249.41 355,340.75 0.13 5,887.83 MWD+IFR-AK-CAZ-SC (4) 9,417.28 66.00 118.27 5,262.58 5,192.13 -3,596.07 5,929.57 5,962,207.05 355,414.42 0.96 5,958.91 MWD+IFR-AK-CAZ-SC (4) 9,512.16 65.56 116.68 5,301.50 5,231.05 -3,635.99 6,006.33 5,962,165.60 355,490.36 1.60 6,030.19 MWD+IFR-AK-CAZ-SC (4) 9,604.38 65.43 116.53 5,339.75 5,269.30 -3,673.57 6,081.36 5,962,126.53 355,564.62 0.20 6,098.60 MWD+IFR-AK-CAZ-SC (4) 9,700.78 65.87 116.73 5,379.50 5,309.05 -3,712.94 6,159.87 5,962,085.60 355,642.31 0.49 6,170.21 MWD+IFR-AK-CAZ-SC (4) 9,793.87 65.46 118.06 5,417.86 5,347.41 -3,751.96 6,235.17 5,962,045.08 355,716.82 1.37 6,240.02 MWD+IFR-AK-CAZ-SC (4) 9,888.80 65.62 119.96 5,457.17 5,386.72 -3,793.87 6,310.74 5,962,001.67 355,791.52 1.83 6,312.50 MWD+IFR-AK-CAZ-SC (4) 9,982.62 66.04 120.86 5,495.58 5,425.13 -3,837.19 6,384.55 5,961,956.88 355,864.45 0.98 6,385.41 MWD+IFR-AK-CAZ-SC (4) 10,076.49 66.01 121.88 5,533.73 5,463.28 -3,881.84 6,457.79 5,961,910.78 355,936.77 0.99 6,459.21 MWD+IFR-AK-CAZ-SC (4) 10,169.41 66.16 122.87 5,571.40 5,500.95 -3,927.32 6,529.52 5,961,863.87 356,007.57 0.99 6,533.05 MWD+IFR-AK-CAZ-SC (4) 10,264.29 66.04 123.77 5,609.84 5,539.39 -3,974.97 6,602.01 5,961,814.78 356,079.08 0.88 6,609.15 MWD+IFR-AK-CAZ-SC (4) 10,358.35 66.03 124.16 5,648.04 5,577.59 -4,022.99 6,673.29 5,961,765.34 356,149.39 0.38 6,685.01 MWD+IFR-AK-CAZ-SC (4) 10,451.09 65.99 122.80 5,685.75 5,615.30 -4,069.73 6,743.96 5,961,717.20 356,219.10 1.34 6759.46 MWD+IFR-AK-CAZ-SC (4) 10,544.91 65.53 122.64 5,724.27 5,653.82 -4,115.97 6,815.94 5,961,669.53 356,290.13 0.51 6,834.08 MWD+IFR-AK-CAZ-SC (4) 10,639.55 65.46 121.68 5,763.52 5,693.07 -4,161.81 6,888.84 5,961,622.25 356,362.09 0.93 6,908.77 MWD+IFR-AK-CAZ-SC (4) 10,734.25 65.31 120.97 5,802.97 5,732.52 -4,206.57 6,962.38 5,961,576.03 356,434.72 0.70 6,982.82 MWD+IFR-AK-CAZ-SC (4) 10,828.68 65.51 121.04 5,842.26 5,771.81 -4,250.80 7,035.98 5,961,530.33 356,507.41 0.22 7,056.43 MWD+IFR-AK-CAZ-SC (4) 10,923.35 65.44 120.29 5,881.56 5,811.11 -4,294.73 7,110.06 5,961,484.93 356,580.59 0.72 7,129.99 MWD+IFR-AK-CAZ-SC (4) 11,018.15 65.38 119.51 5,921.01 5,850.56 -4,337.70 7,184.79 5,961,440.48 356,654.44 0.75 7,203.02 MWD+IFR-AK-CAZ-SC (4) 11,111.02 65.37 119.39 5,959.71 5,889.26 -4,379.21 7,258.31 5,961,397.51 356,727.10 0.12 7,274.18 MWD+IFR-AK-CAZ-SC (4) 11,204.74 65.57 118.45 5,998.62 5,928.17 -4,420.44 7,332.93 5,961,354.79 356,800.88 0.94 7,345.62 MWD+IFR-AK-CAZ-SC (4) 12/5/2016 10:45:20AM Page 5 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°1100') (ft) Survey Tool Name 11,298.23 65.56 117.64 6,037.29 5,966.84 -4,460.46 7,408.05 5,961,313.28 356,875.18 0.79 7,416.22 MWD+IFR-AK-CAZ-SC (4) 11,392.12 65.57 117.93 6,076.13 6,005.68 -4,500.30 7,483.68 5,961,271.93 356,949.99 0.28 7,486.91 MWD+IFR-AK-CAZ-SC (4) 11,484.54 65.30 118.06 6,114.55 6,044.10 -4,539.76 7,557.90 5,961,231.00 357,023.39 0.32 7,556.59 MWD+IFR-AK-CAZ-SC (4) 11,577.92 65.64 117.98 6,153.32 6,082.87 -4,579.67 7,632.89 5,961,189.60 357,097.57 0.37 7,627.03 MWD+IFR-AK-CAZ-SC (4) 11,673.36 65.52 117.73 6,192.78 6,122.33 -4,620.27 7,709.73 5,961,147.47 357,173.57 0.27 7,698.95 MWD+IFR-AK-CAZ-SC (4) 11,765.10 65.57 118.48 6,230.75 6,160.30 -4,659.61 7,783.39 5,961,106.66 357,246.42 0.75 7,768.27 MWD+IFR-AK-CAZ-SC (4) 11,860.16 65.60 119.08 6,270.05 6,199.60 -4,701.28 7,859.25 5,961,063.48 357,321.43 0.58 7,840.68 MWD+IFR-AK-CAZ-SC (4) 11,952.38 65.50 118.87 6,308.22 6,237.77 -4,741.95 7,932.70 5,961,021.35 357,394.04 0.23 7,911.07 MWD+IFR-AK-CAZ-SC (4) 12,046.87 65.51 118.68 6,347.39 6,276.94 -4,783.34 8,008.06 5,960,978.46 357,468.55 0.18 7,983.00 MWD+IFR-AK-CAZ-SC (4) 12,139.12 65.56 118.79 6,385.60 6,315.15 -4,823.71 8,081.69 5,960,936.63 357,541.35 0.12 8,053.21 MWD+IFR-AK-CAZ-SC (4) 12,233.31 66.14 118.41 6,424.13 6,353.68 -4,864.85 8,157.15 5,960,893.99 357,615.97 0.72 8,124.96 MWD+IFR-AK-CAZ-SC (4) 12,326.43 66.07 118.07 6,461.85 6,391.40 -4,905.14 8,232.15 5,960,852.21 357,690.14 0.34 8,195.74 MWD+IFR-AK-CAZ-SC (4) 12,422.58 66.04 117.55 6,500.88 6,430.43 -4,946.13 8,309.88 5,960,809.67 357,767.03 0.50 8,268.43 MWD+IFR-AK-CAZ-SC (4) 12,516.13 66.01 117.75 6,538.89 6,468.44 -4,985.80 8,385.60 5,960,768.50 357,841.93 0.20 8,339.00 MWD+IFR-AK-CAZ-SC (4) 12,610.15 65.95 117.93 6,577.16 6,506.71 -5,025.91 8,461.53 5,960,726.88 357,917.04 0.19 8,410.06 MWD+IFR-AK-CAZ-SC (4) 12,704.01 65.91 118.06 6,615.44 6,544.99 -5,066.13 8,537.21 5,960,685.15 357,991.89 0.13 8,481.10 MWD+IFR-AK-CAZ-SC (4) 12,797.27 65.94 117.44 6,653.49 6,583.04 -5,105.78 8,612.56 5,960,644.00 358,066.42 0.61 8,551.49 MWD+IFR-AK-CAZ-SC (4) 12,889.72 66.07 117.82 6,691.08 6,620.63 -5,144.95 8,687.39 5,960,603.35 358,140.45 0.40 8,621.20 MWD+IFR-AK-CAZ-SC (4) 12,984.74 66.11 117.20 6,729.59 6,659.14 -5,185.07 8,764.43 5,960,561.69 358,216.67 0.60 8,692.80 MWD+IFR-AK-CAZ-SC (4) 13,078.29 65.60 117.77 6,767.86 6,697.41 -5,224.47 8,840.16 5,960,520.79 358,291.59 0.78 8,763.14 MWD+IFR-AK-CAZ-SC (4) 13,171.16 65.52 118.60 6,806.28 6,735.83 -5,264.40 8,914.68 5,960,479.37 358,365.29 0.82 8,833.38 MWD+IFR-AK-CAZ-SC (4) 13,266.22 65.86 119.22 6,845.42 6,774.97 -5,306.28 8,990.52 5,960,435.98 358,440.26 0.69 8,905.96 MWD+IFR-AK-CAZ-SC (4) 13,359.66 65.96 118.69 6,883.56 6,813.11 -5,347.58 9,065.16 5,960,393.20 358,514.05 0.53 8,977.46 MWD+IFR-AK-CAZ-SC (4) 13,453.44 65.63 117.83 6,922.01 6,851.56 -5,388.08 9,140.50 5,960,351.21 358,588.56 0.91 9,048.59 MWD+IFR-AK-CAZ-SC (4) 13,547.24 65.50 119.12 6,960.81 6,890.36 -5,428.79 9,215.56 5,960,309.00 358,662.79 1.26 9,119.78 MWD+IFR-AK-CAZ-SC (4) 13,641.15 65.47 119.07 6,999.78 6,929.33 -5,470.34 9,290.22 5,960,265.97 358,736.60 0.06 9,191.52 MWD+IFR-AK-CAZ-SC (4) 13,734.37 65.54 118.83 7,038.43 6,967.98 -5,511.40 9,364.45 5,960,223.43 358,809.99 0.25 9,262.62 MWD+IFR-AK-CAZ-SC (4) 13,827.74 65.28 117.91 7,077.28 7,006.83 -5,551.74 9,439.16 5,960,181.60 358,883.86 0.94 9,333.31 MWD+IFR-AK-CAZ-SC (4) 13,921.59 65.19 118.28 7,116.60 7,046.15 -5,591.88 9,514.33 5,960,139.97 358,958.21 0.37 9,404.04 MWD+IFR-AK-CAZ-SC (4) 14,014.98 65.22 117.72 7,155.76 7,085.31 -5,631.68 9,589.19 5,960,098.68 359,032.25 0.55 9,474.33 MWD+IFR-AK-CAZ-SC (4) 14,109.07 65.26 118.12 7,195.17 7,124.72 -5,671.68 9,664.69 5,960,057.18 359,106.92 0.39 9,545.09 MWD+IFR-AK-CAZ-SC (4) 14,202.98 65.22 117.93 7,234.50 7,164.05 -5,711.75 9,739.96 5,960,015.61 359,181.38 0.19 9,615.81 MWD+IFR-AK-CAZ-SC (4) 14,296.25 65.75 118.61 7,273.20 7,202.75 -5,751.94 9,814.70 5,959,973.93 359,255.29 0.87 9,686.39 MWD+IFR-AK-CAZ-SC (4) 14,389.83 66.77 119.72 7,310.87 7,240.42 -5,793.69 9,889.50 5,959,930.70 359,329.23 1.54 9,758.36 MWD+IFR-AK-CAZ-SC (4) 14,483.30 68.61 119.67 7,346.36 7,275.91 -5,836.53 9,964.61 5,959,886.37 359,403.47 1.97 9,831.45 MWD+IFR-AK-CAZ-SC (4) 14,577.19 70.60 119.61 7,379.07 7,308.62 -5,880.05 10,041.10 5,959,841.33 359,479.06 2.12 9,905.78 MWD+IFR-AK-CAZ-SC (4) 14,671.64 74.36 118.47 7,407.50 7,337.05 -5,923.75 10,119.83 5,959,796.06 359,556.90 4.14 9,981.34 MWD+IFR-AK-CAZ-SC (4) 14,766.17 76.79 117.86 7,431.05 7,360.60 -5,966.96 10,200.54 5,959,751.25 359,636.71 2.65 10,057.37 MWD+IFR-AK-CAZ-SC (4) 14,858.93 79.19 118.06 7,450.35 7,379.90 -6,009.49 10,280.67 5,959,707.12 359,715.97 2.60 10,132.55 MWD+IFR-AK-CAZ-SC (4) 14,953.15 79.58 118.16 7,467.71 7,397.26 -6,053.13 10,362.35 5,959,661.86 359,796.76 0.43 10,209.43 MWD+IFR-AK-CAZ-SC (4) 1215/2016 10 45:20AM Page 6 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing (usft) V) V) (usft) (usft) (usft) (usft) (ft) 15,046.95 79.69 119.36 7,484.58 7,414.13 -6,097.52 10,443.24 5,959,615.86 15,046.96 79.69 119.36 7,484.59 7,414.14 -6,097.53 10,443.25 5,959,615.85 •• /Y" h 17•' Map 9416 79.52 Vertical Easting DLS Section (ft) (°/100') (ft) Survey Tool Name 359,876.73 1.26 10,286.60 MWD+IFR-AK-CAZ-SC (4) 359,876.74 0.00 10,286.60 7,498.19 NOT an Actual Survey ZtiC/A L 15,079.88 9416 79.52 119.20 7,490.53 7,420.08 -6,113.36 10,471.49 5,959,599.45 - 359,904.66 - 0.70 10,313.85 INC+TREND (5) 15,121.00 79.00 119.00 7,498.19 7,427.74 -6,133.01 10,506.79 5,959,579.10 359,939.55 1.35 10,347.77 INC+TREND (5) 15,134.00 80.81 118.00 7,500.47 7,430.02 -6,139.12 10,518.04 5,959,572.77 359,950.68 15.85 10,358.44 INC+TREND (5) 15,175.19 78.17 117.51 7,507.98 7,437.53 -6,157.98 10,553.87 5,959,553.20 359,986.12 6.52 10,391.91 INC+TREND (5) 15,268.80 81.23 116.39 7,524.72 7,454.27 -6,199.71 10,635.96 5,959,509.84 360,067.36 3.47 10,467.30 INC+TREND (5) 15,364.69 86.68 116.23 7,534.81 7,464.36 -6,241.96 10,721.41 5,959,465.89 360,151.93 5.69 10,544.72 MWD+IFR-AK-CAZ-SC (6) 15,458.69 90.12 116.56 7,537.43 7,466.98 -6,283.72 10,805.57 5,959,422.45 360,235.23 3.68 10,621.10 MWD+IFR-AK-CAZ-SC (6) 15,554.98 93.24 115.03 7,534.61 7,464.16 -6,325.60 10,892.21 5,959,378.85 360,321.01 3.61 10,698.76 MWD+IFR-AK-CAZ-SC (6) 15,649.60 94.38 116.19 7,528.32 7,457.87 -6,366.41 10,977.34 5,959,336.34 360,405.30 1.72 10,774.75 MWD+IFR-AK-CAZ-SC (6) 15,744.86 93.48 118.58 7,521.79 7,451.34 -6,410.12 11,061.72 5,959,290.96 360,488.78 2.68 10,852.96 MWD+IFR-AK-CAZ-SC (6) 15,840.89 92.79 123.32 7,516.54 7,446.09 -6,459.42 11,143.93 5,959,240.02 360,569.98 4.98 10,935.08 MWD+IFR-AK-CAZ-SC (6) 15,935.97 93.62 124.25 7,511.22 7,440.77 -6,512.20 11,222.83 5,959,185.67 360,647.80 1.31 11,018.73 MWD+IFR-AK-CAZ-SC (6) 16,030.71 93.17 127.15 7,505.61 7,435.16 -6,567.39 11,299.62 5,959,128.96 360,723.47 3.09 11,103.51 MWD+IFR-AK-CAZ-SC (6) 16,126.02 93.03 128.90 7,500.46 7,430.01 -6,626.01 11,374.59 5,959,068.85 360,797.24 1.84 11,190.47 MWD+IFR-AK-CAZ-SC (6) 16,220.66 93.45 130.63 7,495.11 7,424.66 -6,686.45 11,447.22 5,959,006.98 360,868.63 1.88 11,277.92 MWD+IFR-AK-CAZ-SC (6) 16,315.67 92.73 131.78 7,489.99 7,419.54 -6,748.94 11,518.59 5,958,943.07 360,938.74 1.43 11,366.61 MWD+IFR-AK-CAZ-SC (6) 16,410.39 88.81 134.68 7,488.71 7,418.26 -6,813.79 11,587.58 5,958,876.85 361,006.41 5.15 11,456.26 MWD+IFR-AK-CAZ-SC (6) 16,504.91 90.77 140.12 7,489.06 7,418.61 -6,883.34 11,651.53 5,958,806.05 361,068.95 6.12 11,547.69 MWD+IFR-AK-CAZ-SC (6) 16,600.31 88.50 142.05 7,489.67 7,419.22 -6,957.56 11,711.45 5,958,730.65 361,127.36 3.12 11,641.35 MWD+IFR-AK-CAZ-SC (6) 16,696.15 90.12 145.67 7,490.82 7,420.37 -7,034.94 11,767.96 5,958,652.16 361,182.30 4.14 11,736.20 MWD+IFR-AK-CAZ-SC (6) 16,760.35 90.67 146.89 7,490.38 7,419.93 -7,088.33 11,803.59 5,958,598.06 361,216.86 2.08 11,800.08 MWD+IFR-AK-CAZ-SC (6) 16,821.00 90.67 146.89 7,489.67 7,419.22 -7,139.13 11,836.72 5,958,546.61 361,248.96 0.00 11,860.48 PROJECTED to TD 1215/2016 10:45:20AM Page 7 COMPASS 5000.1 Build 74 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. [ Yes ❑ No I have checked to the best of my ability that the following data is correct. F,J Surface Coordinates 0 Declination & Convergence 2 GRS Survey Corrections E] Survey Tool Codes SLB DE: Client Representative: Date: Digitally signed by Brij Hall-Potnis Date: 2016.12.02 22:50:54 -09'00' david.l.lee@conocop aIi iavd signed @c no ophIIIIp&com hillips.com Date: 2016.12.0506:16:07-09'00' 21 61 24 27 79 7 DEC 08 2016 AOGCC FINAL ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CD5-99AL1 CD5-99AL1 NAD 83 Definitive Survey Report 02 December, 2016 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: CD5-99 Wellbore: CD5-99AL1 Design: CD5-99AL1 SLB Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Well CD5-99 Audit Notes: From Well Position +N/ -S 0.00 usft Northing: 5,965,666.90 usft Latitude: 700 18'49.211 N Vertical Section: +E/ -W 0.00 usft Easting: 1,489,591.67 usft Longitude: 151° 13'20.821 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft 8/28/2016 11:55: 2,354.63 2,354.63 CD5-99A Svyl - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer + known azi trend 10/1/2016 11:11: 2,400.38 15,046.95 CD5-99A Svy2 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Wellbore CD5-99AL1 15,268.80 CD5-99AL1 Svyl - SLB_Inc+Filler (CD5- INC+TREND Magnetics Model Name Sample Date Declination Dip Angle Field Strength 11/5/2016 6:32:: 0.35 80.47 (°) (°) (nT) 0.19 BGGM2016 11/2/2016 17.47 80.81 57,509 0.30 136.60 200.00 129.55 -0.11 0.67 Design CD5-99AL1 Date 12/2/2016 Audit Notes: From To Map Version: 1.0 Phase: ACTUAL Tie On Depth: 15,046.95 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction 500.00 CD5-99 Svyl - SLB_NSG-SSHOT (CD5- (usft) (usft) (usft) (°) 572.96 36.55 0.00 0.00 152.00 Survey Program Date 12/2/2016 From To Map Map (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 100.00 500.00 CD5-99 Svyl - SLB_NSG-SSHOT (CD5- GYD-GC-SS Gyrodata gyro single shots 8/28/2016 11:46: 572.96 2,270.51 CD5-99 Svy2 - SLB_MWD_GMAG (CD5 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8/28/2016 11:55: 2,354.63 2,354.63 CD5-99A Svyl - SLB_INC+Filler (CD5-99 INC+TREND Inclinometer + known azi trend 10/1/2016 11:11: 2,400.38 15,046.95 CD5-99A Svy2 - SLB_MWD+GMAG (CD MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 10/1/2016 11:23: 15,079.88 15,268.80 CD5-99AL1 Svyl - SLB_Inc+Filler (CD5- INC+TREND Inclinometer+ known azi trend 11/5/2016 6:23:: 15,364.69 16,760.35 CD5-99AL1 Svy2 - SLB_MWD+GMAG (C MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 11/5/2016 6:32:: Survey 121212016 10 4 7 12PM Page 2 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 36.55 0.00 0.00 36.55 -33.90 0.00 0.00 5,965,666.90 1,489,591.67 0.00 0.00 UNDEFINED 100.00 0.35 80.47 100.00 29.55 0.03 0.19 5,965,666.93 1,489,591.86 0.55 0.06 GYD-GC-SS (1) 200.00 0.30 136.60 200.00 129.55 -0.11 0.67 5,965,666.78 1,489,592.34 0.31 0.41 GYD-GC-SS (1) 300.00 0.42 180.43 300.00 229.55 -0.66 0.85 5,965,666.22 1,489,592.51 0.29 0.99 GYD-GC-SS (1) 400.00 1.46 178.92 399.98 329.53 -2.30 0.87 5,965,664.58 1,489,592.49 1.04 2.44 GYD-GC-SS(1) 500.00 2.50 174.40 499.92 429.47 -5.75 1.11 5,965,661.13 1,489,592.66 1.05 5.60 GYD-GC-SS (1) 572.96 2.84 173.07 572.80 502.35 -9.13 1.48 5,965,657.75 1,489,592.97 0.47 8.75 MWD+IFR-AK-CAZ-SC (2) 659.55 3.53 165.66 659.26 588.81 -13.84 2.40 5,965,653.02 1,489,593.79 0.93 13.35 MWD+IFR-AK-CAZ-SC (2) 751.03 4.95 165.13 750.48 680.03 -20.38 4.11 5,965,646.44 1,489,595.37 1.55 19.93 MWD+IFR-AK-CAZ-SC (2) 645.81 7.79 162.16 844.67 774.22 -30.45 7.13 5,965,636.31 1,489,598.18 3.02 30.23 MWD+IFR-AK-CAZ-SC (2) 121212016 10 4 7 12PM Page 2 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD5 Alpine West Pad MD Reference: Well: CD5-99 North Reference: Wellbore: CD5-99AL1 Survey Calculation Method: Design: CD5-99AL1 Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (') (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 940.37 11.22 158.66 937.92 867.47 -45.12 12.44 5,965,621.54 1,489,603.20 3.68 45.68 MWD+IFR-AK-CAZ-SC (2) 1,034.58 13.28 155.03 1,029.98 959.53 -63.47 20.34 5,965,603.04 1,489,610.73 2.33 65.60 MWD+IFR-AK-CAZ-SC (2) 1,129.57 14.30 153.79 1,122.23 1,051.78 -83.89 30.13 5,965,582.43 1,489,620.11 1.12 88.22 MWD+IFR-AK-CAZ-SC (2) 1,222.50 14.94 150.97 1,212.15 1,141.70 -104.66 41.01 5,965,561.44 1,489,630.57 1.03 111.66 MWD+IFR-AK-CAZ-SC (2) 1,317.05 15.53 150.01 1,303.38 1,232.93 -126.28 53.26 5,965,539.58 1,489,642.37 0.68 136.50 MWD+IFR-AK-CAZ-SC (2) 1,410.15 17.57 146.48 1,392.62 1,322.17 -148.79 67.25 5,965,516.80 1,489,655.91 2.44 162.95 MWD+IFR-AK-CAZ-SC (2) 1,506.38 21.17 141.10 1,483.40 1,412.95 -174.44 86.19 5,965,490.78 1,489,674.33 4.17 194.48 MWD+IFR-AK-CAZ-SC (2) 1,600.00 23.81 137.20 1,569.89 1,499.44 -201.46 109.65 5,965,463.29 1,489,697.24 3.24 229.36 MWD+IFR-AK-CAZ-SC (2) 1,694.62 26.66 133.78 1,655.48 1,585.03 -230.17 137.96 5,965,434.02 1,489,724.97 3.38 268.00 MWD+IFR-AK-CAZ-SC (2) 1,788.88 29.81 132.16 1,738.51 1,668.06 -260.54 170.60 5,965,403.01 1,489,756.99 3.44 310.13 MWD+IFR-AK-CAZ-SC (2) 1,882.95 32.44 130.76 1,819.04 1,748.59 -292.71 207.05 5,965,370.11 1,489,792.79 2.90 355.65 MWD+IFR-AK-CAZ-SC (2) 1,976.79 33.94 130.25 1,897.56 1,827.11 -326.07 246.11 5,965,335.98 1,489,831.17 1.63 403.45 MWD+IFR-AK-CAZ-SC (2) 2,070.83 35.82 129.12 1,974.71 1,904.26 -360.40 287.50 5,965,300.83 1,489,871.86 2.11 453.19 MWD+IFR-AK-CAZ-SC (2) 2,165.49 37.79 127.90 2,050.50 1,980.05 -395.70 331.88 5,965,264.65 1,489,915.51 2.22 505.19 MWD+IFR-AK-CAZ-SC (2) 2,259.49 40.14 127.23 2,123.58 2,053.13 -431.72 378.74 5,965,227.69 1,489,961.63 2.54 559.00 MWD+IFR-AK-CAZ-SC (2) 2,270.51 40.86 126.48 2,131.96 2,061.51 -436.02 384.47 5,965,223.28 1,489,967.27 7.89 565.48 MWD+IFR-AK-CAZ-SC (2) 10-3/4" x 13-1/2" 2,354.63 39.48 125.36 2,196.24 2,125.79 -467.85 428.40 5,965,190.57 1,490,010.56 1.85 614.21 INC+TREND (3) 2,400.38 38.27 124.71 2,231.85 2,161.40 -484.34 451.91 5,965,173.62 1,490,033.73 2.79 639.81 MWD+IFR-AK-CAZ-SC (4) 2,449.55 39.97 124.54 2,270.00 2,199.55 -501.97 477.44 5,965,155.48 1,490,058.90 3.46 667.35 MWD+IFR-AK-CAZ-SC (4) 2,496.41 42.85 122.76 2,305.14 2,234.69 -519.13 503.25 5,965,137.81 1,490,084.35 6.64 694.62 MWD+IFR-AK-CAZ-SC (4) 2,543.50 45.60 122.60 2,338.88 2,268.43 -536.86 530.89 5,965,119.53 1,490,111.63 5.84 723.25 MWD+IFR-AK-CAZ-SC (4) 2,590.10 47.02 122.20 2,371.07 2,300.62 -554.91 559.34 5,965,100.91 1,490,139.71 3.11 752.55 MWD+IFR-AK-CAZ-SC (4) 2,638.47 48.78 121.65 2,403.50 2,333.05 -573.89 589.80 5,965,081.33 1,490,169.78 3.74 783.61 MWD+IFR-AK-CAZ-SC (4) 2,685.65 50.29 121.67 2,434.12 2,363.67 -592.73 620.35 5,965,061.88 1,490,199.94 3.20 814.58 MWD+IFR-AK-CAZ-SC (4) 2,733.47 52.01 121.23 2,464.11 2,393.66 -612.15 652.12 5,965,041.82 1,490,231.32 3.67 846.65 MWD+IFR-AK-CAZ-SC (4) 2,781.44 53.64 120.35 2,493.10 2,422.65 -631.72 684.96 5,965,021.60 1,490,263.75 3.70 879.34 MWD+IFR-AK-CAZ-SC (4) 2,827.79 55.19 120.21 2,520.07 2,449.62 -650.72 717.51 5,965,001.95 1,490,295.91 3.35 911.40 MWD+IFR-AK-CAZ-SC (4) 2,873.78 56.60 120.81 2,545.86 2,475.41 -670.06 750.31 5,964,981.96 1,490,328.32 3.25 943.88 MWD+IFR-AK-CAZ-SC (4) 2,921.08 57.79 121.21 2,571.48 2,501.03 -690.54 784.39 5,964,960.80 1,490,361.97 2.61 977.96 MWD+IFR-AK-CAZ-SC (4) 3,016.32 59.97 123.67 2,620.71 2,550.26 -734.28 853.17 5,964,915.68 1,490,429.86 3.18 1,048.87 MWD+IFR-AK-CAZ-SC (4) 3,061.84 61.29 123.58 2,643.03 2,572.58 -756.25 886.21 5,964,893.06 1,490,462.44 2.90 1,083.78 MWD+IFR-AK-CAZ-SC (4) 3,111.30 62.67 123.84 2,666.27 2,595.82 -780.48 922.53 5,964,868.10 1,490,498.26 2.83 1,122.22 MWD+IFR-AK-CAZ-SC (4) 3,157.34 64.23 123.66 2,686.85 2,616.40 -803.36 956.77 5,964,844.54 1,490,532.04 3.41 1,158.50 MWD+IFR-AK-CAZ-SC (4) 3,203.86 65.52 123.31 2,706.60 2,636.15 -826.60 991.90 5,964,820.61 1,490,566.69 2.86 1,195.51 MWD+IFR-AK-CAZ-SC (4) 3,299.05 65.99 123.09 2,745.69 2,675.24 -874.12 1,064.52 5,964,771.64 1,490,638.34 0.54 1,271.57 MWD+IFR-AK-CAZ-SC (4) 3,392.96 66.08 122.52 2,783.83 2,713.38 -920.62 1,136.65 5,964,723.71 1,490,709.51 0.56 1,346.48 MWD+IFR-AK-CAZ-SC (4) 3,487.44 65.97 122.70 2,822.22 2,751.77 -967.14 1,209.37 5,964,675.74 1,490,781.28 0.21 1,421.70 MWD+IFR-AK-CAZ-SC (4) 3,583.78 66.02 122.64 2,861.42 2,790.97 -1,014.65 1,283.45 5,964,626.75 1,490,854.39 0.08 1,498.42 MWD+IFR-AK-CAZ-SC (4) 3,677.93 66.02 121.78 2,899.68 2,829.23 -1,060.50 1,356.24 5,964,579.45 1,490,926.23 0.83 1,573.08 MWD+IFR-AK-CAZ-SC (4) 1212/2016 10:47.12PM Page 3 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope ND Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (-/100') (ft) Survey Tool Name 3,770.86 66.02 121.62 2,937.45 2,867.00 -1,105.12 1,428.48 5,964,533.40 1,490,997.56 0.16 1,646.39 MWD+IFR-AK-CAZ-SC (4) 3,865.49 66.11 120.21 2,975.84 2,905.39 -1,149.55 1,502.68 5,964,487.48 1,491,070.85 1.37 1,720.46 MWD+IFR-AK-CAZ-SC (4) 3,959.41 66.09 119.23 3,013.89 2,943.44 -1,192.12 1,577.25 5,964,443.43 1,491,144.54 0.95 1,793.05 MWD+IFR-AK-CAZ-SC (4) 4,054.40 66.09 119.90 3,052.39 2,981.94 -1,234.97 1,652.78 5,964,399.08 1,491,219.19 0.64 1,866.34 MWD+IFR-AK-CAZ-SC (4) 4,147.49 66.12 119.78 3,090.10 3,019.65 -1,277.32 1,726.61 5,964,355.26 1,491,292.15 0.12 1,938.40 MWD+IFR-AK-CAZ-SC (4) 4,242.73 65.49 119.45 3,129.13 3,058.68 -1,320.25 1,802.13 5,964,310.82 1,491,366.79 0.73 2,011.76 MWD+IFR-AK-CAZ-SC (4) 4,337.15 65.55 118.48 3,168.26 3,097.81 -1,361.86 1,877.32 5,964,267.71 1,491,441.11 0.94 2,083.80 MWD+IFR-AK-CAZ-SC (4) 4,430.83 65.43 119.60 3,207.12 3,136.67 -1,403.23 1,951.84 5,964,224.85 1,491,514.78 1.10 2,155.32 MWD+IFR-AK-CAZ-SC (4) 4,526.10 65.57 119.96 3,246.63 3,176.18 -1,446.29 2,027.08 5,964,180.29 1,491,589.14 0.37 2,228.66 MWD+IFR-AK-CAZ-SC (4) 4,619.67 65.37 119.87 3,285.48 3,215.03 -1,488.75 2,100.86 5,964,136.37 1,491,662.05 0.23 2,300.78 MWD+IFR-AK-CAZ-SC (4) 4,714.13 65.56 11.8.38 3,324.71 3,254.26 -1,530.57 2,175.93 5,964,093.05 1,491,736.25 1.45 2,372.95 MWD+IFR-AK-CAZ-SC (4) 4,809.66 65.41 118.91 3,364.34 3,293.89 -1,572.23 2,252.21 5,964,049.86 1,491,811.67 0.53 2,445.55 MWD+IFR-AK-CAZ-SC (4) 4,903.76 65.46 118.93 3,403.46 3,333.01 -1,613.62 2,327.12 5,964,006.98 1,491,885.73 0.06 2,517.26 MWD+IFR-AK-CAZ-SC (4) 4,997.13 65.61 118.54 3,442.13 3,371.68 -1,654.48 2,401.64 5,963,964.64 1,491,959.41 0.41 2,588.32 MWD+IFR-AK-CAZ-SC (4) 5,091.58 65.85 118.35 3,480.95 3,410.50 -1,695.49 2,477.35 5,963,922.12 1,492,034.28 0.31 2,660.07 MWD+IFR-AK-CAZ-SC (4) 5,186.76 65.98 118.27 3,519.80 3,449.35 -1,736.70 2,553.85 5,963,879.38 1,492,109.93 0.16 2,732.37 MWD+IFR-AK-CAZ-SC (4) 5,279.36 65.94 118.31 3,557.52 3,487.07 -1,776.78 2,628.31 5,963,837.82 1,492,183.57 0.06 2,802.72 MWD+IFR-AK-CAZ-SC (4) 5,375.09 65.80 118.22 3,596.65 3,526.20 -1,818.15 2,705.26 5,963,794.91 1,492,259.67 0.17 2,875.37 MWD+IFR-AK-CAZ-SC (4) 5,469.64 65.82 118.03 3,635.40 3,564.95 -1,858.81 2,781.33 5,963,752.74 1,492,334.89 0.18 2,946.98 MWD+IFR-AK-CAZ-SC (4) 5,562.68 65.72 118.69 3,673.58 3,603.13 -1,899.11 2,855.99 5,963,710.95 1,492,408.72 0.66 3,017.62 MWD+IFR-AK-CAZ-SC (4) 5,656.11 65.52 118.69 3,712.15 3,641.70 -1,939.96 2,930.64 5,963,668.61 1,492,482.53 0.21 3,088.73 MWD+IFR-AK-CAZ-SC (4) 5,751.20 65.37 118.51 3,751.66 3,681.21 -1,981.36 3,006.57 5,963,625.69 1,492,557.62 0.23 3,160.94 MWD+IFR-AK-CAZ-SC (4) 5,845.38 65.39 117.03 3,790.90 3,720.45 -2,021.25 3,082.33 5,963,584.29 1,492,632.55 1.43 3,231.73 MWD+IFR-AK-CAZ-SC (4) 5,939.38 65.59 116.84 3,829.90 3,759.45 -2,060.00 3,158.58 5,963,544.03 1,492,708.00 0.28 3,301.73 MWD+IFR-AK-CAZ-SC (4) 6,033.53 65.51 117.08 3,868.87 3,798.42 -2,098.85 3,234.97 5,963,503.65 1,492,783.59 0.25 3,371.90 MWD+IFR-AK-CAZ-SC (4) 6,127.05 65.97 117.21 3,907.29 3,836.84 -2,137.75 3,310.84 5,963,463.23 1,492,858.66 0.51 3,441.87 MWD+IFR-AK-CAZ-SC (4) 6,220.59 66.04 117.69 3,945.33 3,874.88 -2,177.15 3,386.68 5,963,422.33 1,492,933.68 0.47 3,512.25 MWD+IFR-AK-CAZ-SC (4) 6,315.27 65.97 118.38 3,983.83 3,913.38 -2,217.80 3,463.02 5,963,380.15 1,493,009.19 0.67 3,583.99 MWD+IFR-AK-CAZ-SC (4) 6,409.67 66.13 118.52 4,022.15 3,951.70 -2,258.90 3,538.88 5,963,337.54 1,493,084.20 0.22 3,655.89 MWD+IFR-AK-CAZ-SC (4) 6,503.79 66.01 118.96 4,060.33 3,989.88 -2,300.27 3,614.31 5,963,294.67 1,493,158.78 0.45 3,727.83 MWD+IFR-AK-CAZ-SC (4) 6,597.09 65.42 119.01 4,098.70 4,028.25 -2,341.48 3,688.70 5,963,251.98 1,493,232.32 0.63 3,799.14 MWD+IFR-AK-CAZ-SC (4) 6,691.36 65.60 118.33 4,137.78 4,067.33 -2,382.63 3,763.97 5,963,209.32 1,493,306.74 0.68 3,870.82 MWD+IFR-AK-CAZ-SC (4) 6,785.93 65.05 117.50 4,177.26 4,106.81 -2,422.87 3,839.91 5,963,167.57 1,493,381.85 0.99 3,941.99 MWD+IFR-AK-CAZ-SC (4) 6,880.32 64.95 118.47 4,217.15 4,146.70 -2,463.01 3,915.45 5,963,125.92 1,493,456.56 0.94 4,012.90 MWD+IFR-AK-CAZ-SC (4) 6,974.08 65.54 119.25 4,256.42 4,185.97 -2,504.10 3,990.02 5,963,083.34 1,493,530.29 0.98 4,084.19 MWD+IFR-AK-CAZ-SC (4) 7,068.23 65.52 119.63 4,295.41 4,224.96 -2,546.22 4,064.64 5,963,039.73 1,493,604.05 0.37 4,156.42 MWD+IFR-AK-CAZ-SC (4) 7,163.21 65.53 120.14 4,334.76 4,264.31 -2,589.30 4,139.59 5,962,995.17 1,493,678.11 0.49 4,229.63 MWD+IFR-AK-CAZ-SC (4) 7,254.95 65.55 119.82 4,372.75 4,302.30 -2,631.02 4,211.93 5,962,952.00 1,493,749.59 0.32 4,300.44 MWD+IFR-AK-CAZ-SC (4) 7,349.11 65.49 120.15 4,411.77 4,341.32 -2,673.85 4,286.15 5,962,907.69 1,493,822.93 0.33 4,373.10 MWD+IFR-AK-CAZ-SC (4) 7,443.24 65.53 120.53 4,450.79 4,380.34 -2,717.12 4,360.08 5,962,862.95 1,493,895.97 0.37 4,446.01 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 10 47:12PM Page 4 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD5-99 Project: Western North Slope TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Site: CD5 Alpine West Pad MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) Well: CD5-99 North Reference: True Wellbore: CD5-99AL1 Survey Calculation Method: Minimum Curvature Design: CD5-99AL1 Database: EDM Production Survey Map Map Vertical MD Inc Azi ND TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 7,537.81 65.62 121.26 4,489.89 4,419.44 -2,761.33 4,433.97 5,962,817.26 1,493,968.95 0.71 4,519.74 MWD+IFR-AK-CAZ-SC (4) 7,631.19 65.55 121.92 4,528.49 4,458.04 -2,805.88 4,506.40 5,962,771.28 1,494,040.46 0.65 4,593.07 MWD+IFR-AK-CAZ-SC (4) 7,723.34 65.59 121.62 4,566.60 4,496.15 -2,850.05 4,577.73 5,962,725.69 1,494,110.89 0.30 4,665.56 MWD+IFR-AK-CAZ-SC (4) 7,818.15 65.53 121.19 4,605.83 4,535.38 -2,895.03 4,651.40 5,962,679.24 1,494,183.63 0.42 4,739.85 MWD+IFR-AK-CAZ-SC (4) 7,913.03 65.50 120.34 4,645.15 4,574.70 -2,939.19 4,725.59 5,962,633.60 1,494,256.92 0.82 4,813.69 MWD+IFR-AK-CAZ-SC (4) 8,006.35 65.49 119.93 4,683.86 4,613.41 -2,981.82 4,799.03 5,962,589.50 1,494,329.48 0.40 4,885.80 MWD+IFR-AK-CAZ-SC (4) 8,101.59 65.59 118.86 4,723.30 4,652.85 -3,024.37 4,874.56 5,962,545.45 1,494,404.13 1.03 4,958.83 MWD+IFR-AK-CAZ-SC (4) 8,194.58 65.58 119.13 4,761.73 4,691.28 -3,065.42 4,948.62 5,962,502.93 1,494,477.35 0.26 5,029.84 MWD+IFR-AK-CAZ-SC (4) 8,290.23 65.53 119.28 4,801.31 4,730.86 -3,107.91 5,024.63 5,962,458.92 1,494,552.48 0.15 5,103.04 MWD+IFR-AK-CAZ-SC (4) 8,384.19 65.40 119.02 4,840.33 4,769.88 -3,149.54 5,099.28 5,962,415.80 1,494,626.28 0.29 5,174.85 MWD+IFR-AK-CAZ-SC (4) 8,477.96 65.40 118.57 4,879.37 4,808.92 -3,190.61 5,173.99 5,962,373.24 1,494,700.15 0.44 5,246.18 MWD+IFR-AK-CAZ-SC (4) 8,571.84 65.43 117.50 4,918.43 4,847.98 -3,230.73 5,249.34 5,962,331.62 1,494,774.67 1.04 5,316.98 MWD+IFR-AK-CAZ-SC (4) 8,665.25 65.65 116.91 4,957.10 4,886.65 -3,269.60 5,324.96 5,962,291.24 1,494,849.49 0.62 5,386.81 MWD+IFR-AK-CAZ-SC (4) 8,760.88 65.94 116.99 4,996.31 4,925.86 -3,309.13 5,402.71 5,962,250.16 1,494,926.42 0.31 5,458.21 MWD+IFR-AK-CAZ-SC (4) 8,855.16 66.00 117.54 5,034.70 4,964.25 -3,348.58 5,479.26 5,962,209.18 1,495,002.15 0.54 5,528.98 MWD+IFR-AK-CAZ-SC (4) 8,947.50 66.06 118.23 5,072.22 5,001.77 -3,388.04 5,553.83 5,962,168.23 1,495,075.92 0.69 5,598.83 MWD+IFR-AK-CAZ-SC (4) 9,041.26 66.16 118.79 5,110.19 5,039.74 -3,428.96 5,629.17 5,962,125.81 1,495,150.41 0.56 5,670.33 MWD+IFR-AK-CAZ-SC (4) 9,135.01 66.13 119.41 5,148.10 5,077.65 -3,470.66 5,704.08 5,962,082.62 1,495,224.47 0.61 5,742.32 MWD+IFR-AK-CAZ-SC (4) 9,230.32 66.03 119.16 5,186.75 5,116.30 -3,513.28 5,780.07 5,962,038.49 1,495,299.58 0.26 5,815.62 MWD+IFR-AK-CAZ-SC (4) 9,324.30 66.13 119.24 5,224.85 5,154.40 -3,555.19 5,855.06 5,961,995.08 1,495,373.71 0.13 5,887.83 MWD+IFR-AK-CAZ-SC (4) 9,417.28 66.00 118.27 5,262.58 5,192.13 -3,596.07 5,929.57 5,961,952.72 1,495,447.37 0.96 5,958.91 MWD+IFR-AK-CAZ-SC (4) 9,512.16 65.56 116.68 5,301.50 5,231.05 -3,635.99 6,006.33 5,961,911.26 1,495,523.31 1.60 6,030.19 MWD+IFR-AK-CAZ-SC (4) 9,604.38 65.43 116.53 5,339.75 5,269.30 -3,673.57 6,081.36 5,961,872.19 1,495,597.56 0.20 6,098.60 MWD+IFR-AK-CAZ-SC (4) 9,700.78 65.87 116.73 5,379.50 5,309.05 -3,712.94 6,159.87 5,961,831.26 1,495,675.26 0.49 6,170.21 MWD+IFR-AK-CAZ-SC (4) 9,793.87 65.46 118.06 5,417.86 5,347.41 -3,751.96 6,235.17 5,961,790.73 1,495,749.76 1.37 6,240.02 MWD+IFR-AK-CAZ-SC (4) 9,888.80 65.62 119.96 5,457.17 5,386.72 -3,793.87 6,310.74 5,961,747.32 1,495,824.46 1.83 6,312.50 MWD+IFR-AK-CAZ-SC (4) 9,982.62 66.04 120.86 5,495.58 5,425.13 -3,837.19 6,384.55 5,961,702.52 1,495,897.39 0.98 6,385.41 MWD+IFR-AK-CAZ-SC (4) 10,076.49 66.01 121.88 5,533.73 5,463.28 -3,881.84 6,457.79 5,961,656.41 1,495,969.70 0.99 6,459.21 MWD+IFR-AK-CAZ-SC (4) 10,169.41 66.16 122.87 5,571.40 5,500.95 -3,927.32 6,529.52 5,961,609.50 1,496,040.51 0.99 6,533.05 MWD+IFR-AK-CAZ-SC (4) 10,264.29 66.04 123.77 5,609.84 5,539.39 -3,974.97 6,602.01 5,961,560.41 1,496,112.01 0.88 6,609.15 MWD+IFR-AK-CAZ-SC (4) 10,358.35 66.03 124.16 5,648.04 5,577.59 -4,022.99 6,673.29 5,961,510.97 1,496,182.32 0.38 6,685.01 MWD+IFR-AK-CAZ-SC (4) 10,451.09 65.99 122.80 5,685.75 5,615.30 -4,069.73 6,743.96 5,961,462.83 1,496,252.02 1.34 6,759.46 MWD+IFR-AK-CAZ-SC (4) 10,544.91 65.53 122.64 5,724.27 5,653.82 -4,115.97 6,815.94 5,961,415.15 1,496,323.05 0.51 6,834.08 MWD+IFR-AK-CAZ-SC (4) 10,639.55 65.46 121.68 5,763.52 5,693.07 -4,161.81 6,888.84 5,961,367.86 1,496,395.01 0.93 6,908.77 MWD+IFR-AK-CAZ-SC (4) 10,734.25 65.31 120.97 5,802.97 5,732.52 -4,206.57 6,962.38 5,961,321.64 1,496,467.63 0.70 6,982.82 MWD+IFR-AK-CAZ-SC (4) 10,828.68 65.51 121.04 5,842.26 5,771.81 -4,250.80 7,035.98 5,961,275.94 1,496,540.32 0.22 7,056.43 MWD+IFR-AK-CAZ-SC (4) 10,923.35 65.44 120.29 5,881.56 5,811.11 -4,294.73 7,110.06 5,961,230.54 1,496,613.50 0.72 7,129.99 MWD+IFR-AK-CAZ-SC (4) 11,018.15 65.38 119.51 5,921.01 5,850.56 -4,337.70 7,184.79 5,961,186.08 1,496,687.35 0.75 7,203.02 MWD+IFR-AK-CAZ-SC (4) 11,111.02 65.37 119.39 5,959.71 5,889.26 -4,379.21 7,258.31 5,961,143.11 1,496,760.01 0.12 7,274.18 MWD+IFR-AK-CAZ-SC (4) 11,204.74 65.57 118.45 5,998.62 5,928.17 -4,420.44 7,332.93 5,961,100.39 1,496,833.79 0.94 7,345.62 MWD+IFR-AK-CAZ-SC (4) 121212016 10:47:12PM Page 5 COMPASS 5000.1 Build 74 SLB Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope ND Reference: Site: CD5 Alpine West Pad MD Reference: Well: CD5-99 North Reference: Wellbore: CD5-99AL1 Survey Calculation Method: Design: CD5-99AL1 Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production Survey Map Map Vertical MD Inc Azi ND TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) V) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 11,298.23 65.56 117.64 6,037.29 5,966.84 -4,460.46 7,408.05 5,961,058.87 1,496,908.08 0.79 7,416.22 MWD+IFR-AK-CAZ-SC (4) 11,392.12 65.57 117.93 6,076.13 6,005.68 -4,500.30 7,483.68 5,961,017.52 1,496,982.89 0.28 7,486.91 MWD+IFR-AK-CAZ-SC (4) 11,484.54 65.30 118.06 6,114.55 6,044.10 -4,539.76 7,557.90 5,960,976.58 1,497,056.29 0.32 7,556.59 MWD+IFR-AK-CAZ-SC (4) 11,577.92 65.64 117.98 6,153.32 6,082.87 -4,579.67 7,632.89 5,960,935.18 1,497,130.47 0.37 7,627.03 MWD+IFR-AK-CAZ-SC (4) 11,673.36 65.52 117.73 6,192.78 6,122.33 -4,620.27 7,709.73 5,960,893.04 1,497,206.46 0.27 7,698.95 MWD+IFR-AK-CAZ-SC (4) 11,765.10 65.57 118.48 6,230.75 6,160.30 -4,659.61 7,783.39 5,960,852.23 1,497,279.31 0.75 7,768.27 MWD+IFR-AK-CAZ-SC (4) 11,860.16 65.60 119.08 6,270.05 6,199.60 -4,701.28 7,859.25 5,960,809.05 1,497,354.32 0.58 7,840.68 MWD+IFR-AK-CAZ-SC (4) 11,952.38 65.50 118.87 6,308.22 6,237.77 -4,741.95 7,932.70 5,960,766.92 1;497,426.93 0.23 7,911.07 MWD+IFR-AK-CAZ-SC (4) 12,046.87 65.51 118.68 6,347.39 6,276.94 -4,783.34 8,008.06 5,960,724.02 1,497,501.44 0.18 7,983.00 MWD+IFR-AK-CAZ-SC (4) 12,139.12 65.56 118.79 6,385.60 6,315.15 -4,823.71 8,081.69 5,960,682.19 1,497,574.24 0.12 8,053.21 MWD+IFR-AK-CAZ-SC (4) 12,233.31 66.14 118.41 6,424.13 6,353.68 -4,864.85 8,157.15 5,960,639.54 1,497,648.85 0.72 8,124.96 MWD+IFR-AK-CAZ-SC (4) 12,326.43 66.07 118.07 6,461.85 6,391.40 -4,905.14 8,232.15 5,960,597.76 1,497,723.03 0.34 8,195.74 MWD+IFR-AK-CAZ-SC (4) 12,422.58 66.04 117.55 6,500.88 6,430.43 -4,946.13 8,309.88 5,960,555.21 1,497,799.91 0.50 8,268.43 MWD+IFR-AK-CAZ-SC (4) 12,516.13 66.01 117.75 6,538.89 6,468.44 -4,985.80 8,385.60 5,960,514.04 1,497,874.80 0.20 8,339.00 MWD+IFR-AK-CAZ-SC (4) 12,610.15 65.95 117.93 6,577.16 6,506.71 -5,025.91 8,461.53 5,960,472.42 1,497,949.92 0.19 8,410.06 MWD+IFR-AK-CAZ-SC (4) 12,704.01 65.91 118.06 6,615.44 6,544.99 -5,066.13 8,537.21 5,960,430.68 1,498,024.76 0.13 8,481.10 MWD+IFR-AK-CAZ-SC (4) 12,797.27 65.94 117.44 6,653.49 6,583.04 -5,105.78 6.,612.56 5,960,389.53 1,498,099.30 0.61 8,551.49 MWD+IFR-AK-CAZ-SC (4) 12,889.72 66.07 117.82 6,691.08 6,620.63 -5,144.95 8,687.39 5,960,348.87 1,498,173.32 0.40 8,621.20 MWD+IFR-AK-CAZ-SC (4) 12,984.74 66.11 117.20 6,729.59 6,659.14 -5,185.07 8,764.43 5,960,307.21 1,498,249.53 0.60 8,692.80 MWD+IFR-AK-CAZ-SC (4) 13,078.29 65.60 117.77 6,767.86 6,697.41 -5,224.47 8,840.16 5,960,266.31 1,498,324.45 0.78 8,763.14 MWD+IFR-AK-CAZ-SC (4) 13,171.16 65.52 118.60 6.,806.28 6,735.83 -5,264.40 8,914.68 5,960,224.89 1,498,398.15 0.82 8,833.38 MWD+IFR-AK-CAZ-SC (4) 13,266.22 65.86 119.22 6,845.42 6,774.97 -5,306.28 8,990.52 5,960,181.49 1,498,473.12 0.69 8,905.96 MWD+IFR-AK-CAZ-SC (4) 13,359.66 65.96 118.69 6,883.56 6,813.11 -5,347.58 9,065.16 5,960,138.71 1,498,546.91 0.53 8,977.46 MWD+IFR-AK-CAZ-SC (4) 13,453.44 65.63 117.83 6,922.01 6,851.56 -5,388.08 9,140.50 5,960,096.71 1,498,621.42 0.91 9,048.59 MWD+IFR-AK-CAZ-SC (4) 13,547.24 65.50 119.12 6,960.81 6,890.36 -5,428.79 9,215.56 5,960,054.50 1,498,695.64 1.26 9,119.78 MWD+IFR-AK-CAZ-SC (4) 13,641.15 65.47 119.07 6,999.78 6,929.33 -5,470.34 9,290.22 5,960,011.46 1,498,769.45 0.06 9,191.52 MWD+IFR-AK-CAZ-SC (4) 13,734.37 65.54 118.83 7,038.43 6,967.98 -5,511.40 9,364.45 5,959,968.92 1,498,842.83 0.25 9,262.62 MWD+IFR-AK-CAZ-SC (4) 13,827.74 65.28 117.91 7,077.28 7,006.83 -5,551.74 9,439.16 5,959,927.09 1,498,916.71 0.94 9,333.31 MWD+IFR-AK-CAZ-SC (4) 13,921.59 65.19 118.28 7,116.60 7,046.15 -5,591.88 9,514.33 5,959,885.46 1,498,991.06 0.37 9,404.04 MWD+IFR-AK-CAZ-SC (4) 14,014.98 65.22 117.72 7,155.76 7,085.31 -5,631.68 9,589.19 5,959,844.16 1,499,065.09 0.55 9,474.33 MWD+IFR-AK-CAZ-SC (4) 14,109.07 65.26 118.12 7,195.17 7,124.72 -5,671.68 9,664.69 5,959,802.65 1,499,139.76 0.39 9,545.09 MWD+IFR-AK-CAZ-SC (4) 14,202.98 65.22 117.93 7,234.50 7,164.05 -5,711.75 9,739.96 5,959,761.08 1,499,214.22 0.19 9,615.81 MWD+IFR-AK-CAZ-SC (4) 14,296.25 65.75 118.61 7,273.20 7,202.75 -5,751.94 9,814.70 5,959,719.40 1,499,288.13 0.87 9,686.39 MWD+IFR-AK-CAZ-SC (4) 14,389.83 66.77 119.72 7,310.87 7,240.42 -5,793.69 9,889.50 5,959,676.16 1,499,362.07 1.54 9,758.36 MWD+IFR-AK-CAZ-SC (4) 14,483.30 68.61 119.67 7,346.36 7,275.91 -5,836.53 9,964.61 5,959,631.83 1,499,436.30 1.97 9,831.45 MWD+IFR-AK-CAZ-SC (4) 14,577.19 70.60 119.61 7,379.07 7,308.62 -5,880.05 10,041.10 5,959,586.78 1,499,511.89 2.12 9,905.78 MWD+IFR-AK-CAZ-SC (4) 14,671.64 74.36 118.47 7,407.50 7,337.05 -5,923.75 10,119.83 5,959,541.51 1,499,589.72 4.14 9,981.34 MWD+IFR-AK-CAZ-SC (4) 14,766.17 76.79 117.86 7,431.05 7,360.60 -5,966.96 10,200.54 5,959,496.69 1,499,669.54 2.65 10,057.37 MWD+IFR-AK-CAZ-SC (4) 14,858.93 79.19 118.06 7,450.35 7,379.90 -6,009.49 10,280.67 5,959,452.56 1,499,748.79 2.60 10,132.55 MWD+IFR-AK-CAZ-SC (4) 14,953.15 79.58 118.16 7,467.71 7,397.26 -6,053.13 10,362.35 5,959,407.30 1,499,829.58 0.43 10,209.43 MWD+IFR-AK-CAZ-SC (4) 12/2/2016 10 47 12PM Page 6 COMPASS 5000.1 Build 74 Company: Project: Site: Well: Wellbore: Design: Survey ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad CD5-99 CD5-99AL1 CD5-99AL1 SLB Definitive Survey Report MD Inc Azi TVD TVDSS +N/ -S (usft) (°) (°) (usft) (usft) (usft) 15,046.95 79.69 119.36 7,484.58 7,414.13 -6,097.52 Tie On 15,046.96 79.69 119.36 7,484.59 7,414.14 -6,097.53 15,079.88 79.52 119.20 7,490.53 7,420.08 -6,113.36 15,121.00 79.00 119.00 7,498.19 7,427.74 -6,133.01 15,134.00 80.81 118.00 7,500.47 7,430.02 -6,139.12 15,175.19 78.17 117.51 7,507.98 7,437.53 -6,157.98 15,268.80 81.23 116.39 7,524.72 7,454.27 -6,199.71 15,364.69 86.68 116.23 7,534.81 7,464.36 -6,241.96 15,458.69 90.12 116.56 7,537.43 7,466.98 -6,283.72 15,554.98 93.24 115.03 7,534.61 7,464.16 -6,325.60 15,649.60 94.38 116.19 7,528.32 7,457.87 -6,366.41 15,744.86 93.48 118.58 7,521.79 7,451.34 -6,410.12 15,840.89 92.79 123.32 7,516.54 7,446.09 -6,459.42 15,935.97 93.62 124.25 7,511.22 7,440.77 -6,512.20 16,030.71 93.17 127.15 7,505.61 7,435.16 -6,567.39 16,126.02 93.03 128.90 7,500.46 7,430.01 -6,626.01 16,220.66 93.45 130.63 7,495.11 7,424.66 -6,686.45 16,315.67 92.73 131.78 7,489.99 7,419.54 -6,748.94 16,410.39 88.81 134.68 7,488.71 7,418.26 -6,813.79 16,504.91 90.77 140.12 7,489.06 7,418.61 -6,883.34 16,600.31 88.50 142.05 7,489.67 7,419.22 -6,957.56 16,696.15 90.12 145.67 7,490.82 7,420.37 -7,034.94 16,760.35 90.67 146.89 7,490.38 7,419.93 -7,088.33 16,821.00 90.67 146.89 7,489.67 7,419.22 -7,139.13 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Doyon 19) True Minimum Curvature EDM Production 12/2/2016 10:47:12PM Page 7 COMPASS 5000.1 Build 74 Map Map Vertical +E/ -W Northing Easting DLS Section (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 10,443.24 5,959,361.29 1,499,909.55 1.26 10,286.60 MWD+IFR-AK-CAZ-SC (4) 10286.60 10,443.25 5,959,361.29 1,499,909.56 0.00 NOT en Actual Survey 10,313.85 INC+TREND (5) 10,471.49 5,959,344.89 1,499,937.47 0.70 10,506.79 5,959,324.54 1,499,972.37 1.35 10,347.77 INC+TREND (5) 10,518.04 5,959,318.21 1,499,983.49 15.85 10,358.44 INC+TREND (5) 10,553.87 5,959,298.63 1,500,018.94 6.52 10,391.91 INC+TREND (5) 10,635.96 5,959,255.26 1,500,100.17 3.47 10,467.30 INC+TREND (5) 10,721.41 5,959,211.31 1,500,184.74 5.69 10,544.72 MWD+IFR-AK-CAZ-SC (6) 10,805.57 5,959,167.86 1,500,268.04 3.68 10,621.10 MWD+IFR-AK-CAZ-SC (6) 10,892.21 5,959,124.26 1,500,353.82 3.61 10,698.76 MWD+IFR-AK-CAZ-SC (6) 10,977.34 5,959,081.75 1,500,438.10 1.72 10,774.75 MWD+IFR-AK-CAZ-SC (6) 11,061.72 5,959,036.36 1,500,521.58 2.68 10,852.96 MWD+IFR-AK-CAZ-SC (6) 11,143.93 5,958,985.42 1,500,602.78 4.98 10,935.08 MWD+IFR-AK-CAZ-SC (6) 11,222.83 5,958,931.06 1,500,680.59 1.31 11,018.73 MWD+IFR-AK-CAZ-SC (6) 11,299.62 5,958,874.35 1,500,756.26 3.09 11,103.51 MWD+IFR-AK-CAZ-SC (6) 11,374.59 5,958,814.24 1,500,830.03 1.84 11,190.47 MWD+IFR-AK-CAZ-SC (6) 11,447.22 5,958,752.36 1,500,901.42 1.88 11,277.92 MWD+IFR-AK-CAZ-SC (6) 11,518.59 5,958,688.45 1,500,971.52 1.43 11,366.61 MWD+IFR-AK-CAZ-SC (6) 11,587.58 5,958,622.23 1,501,039.19 5.15 11,456.26 MWD+IFR-AK-CAZ-SC (6) 11,651.53 5,958,551.42 1,501,101.72 6.12 11,547.69 MWD+IFR-AK-CAZ-SC (6) 11,711.45 5,958,476.02 1,501,160.13 3.12 11,641.35 MWD+IFR-AK-CAZ-SC (6) 11,767.96 5,958,397.53 1,501,215.07 4.14 11,736.20 MWD+IFR-AK-CAZ-SC (6) 11,803.59 5,958,343.43 1,501,249.63 2.08 11,800.08 MWD+IFR-AK-CAZ-SC (6) 11,836.72 5,958,291.98 1,501,281.72 0.00 11,860.48 PROJECTED to TD NOT an AcWal Su 12/2/2016 10:47:12PM Page 7 COMPASS 5000.1 Build 74 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. P] Yes ❑ No 1 have checked to the best of my ability that the following data is correct. P,I Surface Coordinates E] Declination & Convergence El GRS Survey Corrections E] Survey Tool Codes SLB DE: Client Representative: Date: Digitally signed by Brij Hall-Potnis Date: 2016.12.02 22:50:54 -09'00' david.l.lee@conocop Digitallysigned by david.�.lee@conocophillips.com hillips.com Date: 2016.12.0506:16:07-09'00' Schwartz, Guy L (DOA) P 7 5 p l(,,_12 - From: 1Z From: Lee, David L<David.L.Lee@conocophillips.com> Sent: Thursday, November 10, 2016 7:00 AM To: Schwartz, Guy L (DOA); Loepp, Victoria T (DOA) Cc: Njoku, Johnson; Herbert, Frederick 0; Doyon 19 Company Man Subject: RE: CD5-99AL1 (216-124) Doyon 19 Plan Forward Attachments: CD5-99A space out 11_9.xlsx Guy, here is our latest tally for our isolation assembly. The bottom ECP will be placed at 15, 766' while the top ECP will be at 15,515' with the top of the assembly is at 15,500'. Our planned kick off depth is 15,400' and will be an open hole sidetrack, we will not be using this assembly to assist in kicking off. After kicking off, our wellbore gets 130' away from CD5-99AL1PB1 and then turns back to the planned line, we do stay within 500' of our latest permitted wellbore. If you need anything else, please let me know. Thanks David From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Wednesday, November 09, 20161:49 PM To: Lee, David L <David.L.Lee@conocophillips.com>; Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Herbert, Frederick 0 <Frederick.O.Herbert@conocophillips.com>; Doyon 19 Company Man <doyonl@conocophillips.com> Subject: [EXTERNAL]RE: CD5-99AL1 (216-124) Doyon 19 Plan Forward David, Can you send me a schematic of your isolation assembly please and how it will be positioned in the wellbore. Assume you are using this as an openhole kickoff and also to isolate the wellbore below. This lost section of the wellbore will be CD5-99L1 PB1 I believe. Needs an API suffix of -70 assigned to it. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIAUTY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226) or (Guy.schwartz@alaska.gov). From: Lee, David L[mailto:David.L.Lee@conocophillips.com] Sent: Wednesday, November 09, 201610:50 AM To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>; Schwartz, Guy L (DOA) <guy.schwa rtz@aIaska.gov> Cc: Njoku, Johnson <Johnson.Njoku@conocophillips.com>; Herbert, Frederick 0 <Frederick.O.Herbert@conocophillips.com>; Doyon 19 Company Man <doyonl@conocophillips.com> Subject: CD5-99AL1 (216-124) Doyon 19 Plan Forward Good morning Guy, below summarizes ConocoPhillips plan forward for CD5-99AL1: 1. Finish weighting up mud system to 10.8 ppg at our intermediate casing window 2. RIH to TD (16,821') and circulate out light mud in our lateral section to ensure we have a good 10.8 ppg all through wellbore 3. Pump out of hole 4. Test pipe rams 5. Pick up and RIH with isolation assembly (Swell packer and 3 ECP's) 6. Set isolation assembly at 15,600' Pull out of hole with isolation assembly running tools. 8. RIH with either a motor or rotary steerable assembly to sidetrack CD5-99AL1 9. Before sidetracking, reduce MW to 8.8 ppg and perform negative test to ensure the isolation assembly is holding 10. If isolation assembly holding, sidetrack wellbore at 15,400' and drill Alpine C lateral to TD. Once sidetracked we will be back on the plan summarized in our PTD. ConocoPhillips will notify the AOGCC of any deviations from this plan forward. Please let us know if you would like any more information. Thanks David From: Lee, David L Sent: Tuesday, November 08, 2016 5:18 PM To: Loepp, Victoria L (DOA) (victoria.loepp alaska.gov) <victoria.loepp@alaska.gov>; 'Schwartz, Guy L (DOA)' <guy.schwartz(c@alaska.gov> Subject: RE: CD5-99AL1 (216-124) Doyon 19 BOP Closure Notification Guy, as discussed on the phone, here is a couple pictures of our wellbore paths and our planned sidetrack for CD5- 99AL1. We have not 100% committed to this sidetrack plan as our plan forward yet but we are working it in case we go that route. There is a lot going on in these pictures so please call and I can review with you if there are any questions. Thanks David « File: CD5-99AL1—wp25.pptx >> From: Lee, David L Sent: Tuesday, November 08, 2016 3:00 PM To: Loepp, Victoria L (DOA) (victoria.loepp@alaska.gov) <victoria.loepp@alaska.gov>; 'Schwartz, Guy L (DOA)' <guy.schwartz@alaska.gov> Cc: Njoku, Johnson <Johnson.Nioku@conocophiIlips.com>; Doyon 19 Company Man (doyonl@conocophillips.com) <doyonl@conocophillips.com>; Alvord, Chip (Chip.Alvord@conocophillips.com) <Chip.Alvord@conocophillips.com>; Herbert, Frederick 0 (Frederick.O.Herbert@conocophillips.com) <Frederick.O.Herbert@conocophillips.com> Subject: CD5-99AL1 (216-124) Doyon 19 BOP Closure Notification Victoria / Guy, Yesterday afternoon while drilling CD5-99AL1 lateral @ 16,821 a batch survey correction was done that shifted our wellbore significantly left of our planned line. This shift put us into an anti -collision situation with our previously drilled CD5-99 intermediate wellbore (the well we abandoned and re drilled). As the CD5-99 wellbore still has communication between the Alpine C and the Kuparuk C due to the fact we were unable to get our cement stinger through the Kalubik shales while abandoning the hole, we were concerned with the potential wellbore communication. In order to make sure we could proceed forward safely we pumped out to our intermediate casing window at 15,121' and performed an open hole FIT to 11.5 ppg MW. In order to do the FIT with our 8.8 ppg MW in the hole we closed our upper 3.5" x 6" VBR pipe rams. We got a solid 11.5 ppg LOT for 10 minutes with 1040 psi surface pressure. After our FIT we wanted to get a finger print of our current pore pressure before proceeding. We bled back a total of 4.5 bbl which brought our wellbore pressure down to 0 psi and then shut in our chokes again against our closed pipe rams. The well was shut in at 620 pm 11/7/2016. We monitored the well all evening and through the morning and watched the pressure climb 540 psi. This proves that our concern with communication with the Kuparuk C was real but it is just an extremely slow build up. Currently ConocoPhillips is in the process of weighting up to kill the well before we come out of the hole. We are working on our plan forward and once we have a plan forward in place I will email the AOGCC. We are planning to kill the well with 10.8 ppg OBM. Once out of the hole, ConocoPhillips will test our pipe rams. Date /Time of ROPE use: 11/7/2016 @ 3:15 pm — initial time rams were closed to do FIT Well location / PTD number: CD5-99A, PTD# 216-124 Rig Name: Doyon 19 Operator Contact: David Lee, 907-231-7613 BOPE Used: Upper VBR's (3.5" x 6") Operations summary: Above Reason for BOPE use: Initial was to perform open hole FIT and then finger print reservoir which climber much higher than expected Plan Forward: TBD Last Full BOPE test: 11/4/2016 Please let me know if the AOGCC requires any other information. Thanks David Lee C Sand Plug Assembly Description MD ft TVD Est Length ft Ft Top Depth M Running tool Crossover, 3.5" IF x 4 1/2" IBT B 15500 10 15500 Crossover IBTM x HYD 521 PP 5 15510 ECP Packer #3 HYD 521 BB 23 Crossover HYD 521 x IBTM PP 2.5 15538 Tubin 4.5" IBTM 40 5540.5 PACKER SWELL,4 1/2" X 6.38" TAM FREECAP IBTM 15 5580.5 7,5635.5 Tubin 4.5" IBTM 40 5595.5 Crossover IBTM x HYD 521 PP 5 ECP Packer #2 HYD 521 BB 23 Crossover HYD 521 x IBTM PP 2.5 15663.5 Tubin 4.5" IBTM 40 15666 PACKER SWELL 4 1/2" X 6.38" TAM FREECAP IBTM 15 15706 Tubing, 4.5" IBTM 40 15721 Crossover IBTM x HYD 521 PP 5 15761 ECP Packer #1 HYD 521 BB 15700 23 %5766 WIV HYD 521 5 15789 Float Shoe HYD521 5 15794 * 6.5" floating centralizers on full and pup joints Total Length 299 Schwartz, Guy L (DOA) From: Lee, David L<David.L.Lee@conocophillips.com> Sent: Tuesday, November 08, 2016 5:18 PM To: Loepp, Victoria T (DOA); Schwartz, Guy L (DOA) Subject: RE: CD5-99AL1 (216-124) Doyon 19 BOP Closure Notification Attachments: CD5-99AL1_wp25.pptx Guy, as discussed on the phone, here is a couple pictures of our wellbore paths and our planned sidetrack for CD5- 99AL1. We have not 100% committed to this sidetrack plan as our plan forward yet but we are working it in case we go that route. There is a lot going on in these pictures so please call and I can review with you if there are any questions. Thanks David From: Lee, David L Sent: Tuesday, November 08, 2016 3:00 PM To: Loepp, Victoria L (DOA) (victoria.loepp@alaska.gov) <victoria.loepp@alaska.gov>; 'Schwartz, Guy L (DOA)' <guy.schwa rtz@alaska.gov> Cc: Njoku, Johnson <Johnson.Njoku@conocophiIlips.com>; Doyon 19 Company Man (doyonl@conocophillips.com) <doyonl@conocophillips.com>; Alvord, Chip(Chip.Alvord@conocophillips.com) <Chip.Alvord@conocophiIli ps.com>; Herbert, Frederick O (Frederick.O.Herbert@conocophillips.com) <Frederick.O.Herbert@conocophiIIips.com> Subject: CD5-99AL1 (216-124) Doyon 19 BOP Closure Notification Victoria / Guy, Yesterday afternoon while drilling CD5-99AL1 lateral @ 16,821 a batch survey correction was done that shifted our wellbore significantly left of our planned line. This shift put us into an anti -collision situation with our previously drilled CD5-99 intermediate wellbore (the well we abandoned and re drilled). As the CD5-99 wellbore still has communication between the Alpine C and the Kuparuk C due to the fact we were unable to get our cement stinger through the Kalubik shales while abandoning the hole, we were concerned with the potential wellbore communication. In order to make sure we could proceed forward safely we pumped out to our intermediate casing window at 15,121' and performed an open hole FIT to 11.5 ppg MW. In order to do the FIT with our 8.8 ppg MW in the hole we closed our upper 3.5" x 6" VBR pipe rams. We got a solid 11.5 ppg LOT for 10 minutes with 1040 psi surface pressure. After our FIT we wanted to get a finger print of our current pore pressure before proceeding. We bled back a total of 4.5 bbl which brought our wellbore pressure down to 0 psi and then shut in our chokes again against our closed pipe rams. The well was shut in at 620 pm 11/7/2016. We monitored the well all evening and through the morning and watched the pressure climb 540 psi. This proves that our concern with communication with the Kuparuk C was real but it is just an extremely slow build up. Currently ConocoPhillips is in the process of weighting up to kill the well before we come out of the hole. We are working on our plan forward and once we have a plan forward in place I will email the AOGCC. We are planning to kill the well with 10.8 ppg OBM. Once out of the hole, ConocoPhillips will test our pipe rams. Date /Time of BOPE use: 11/7/2016 @ 3:15 pm — initial time rams were closed to do FIT Well location / PTD number: CD5-99A, PTD# 216-124 Rig Name: Doyon 19 Operator Contact: David Lee, 907-231-7613 ROPE Used: Upper VBR's (3.5" x 6") Operations summary: Above Reason for BOPE use: Initial was to perform open hole FIT and then finger print reservoir which climber much higher than expected Plan Forward: TBD Last Full BOPE test: 11/4/2016 Please let me know if the AOGCC requires any other information. Thanks David Lee ,c (— /Z -Y F% iL"YJ 1$970 12100 1= 126M 1'. 00 1=&q 12970 137IX1 11100 13PCC 11370 131% 11507 13707 'm 11IX10 11915 11199 12p7 ION 1/190 11500 1W00 11"90 11800 11900 1m .!ix 152M t5%10 15100 15570 CD599sdnllo All Wells projected onto```" CD5-99AL1 WP25 - intersection plane —= 840' - -- 350' 001 -AS _ CD5-99 – �- CD5-99A --- _ `�----�._._, CD5-99AL1 P131 '"� CD5-99AL1 WP25 1/4 4k, Al i'i AA C_ 4 CnnMn 14nndnn 15(DQRno 1501200 1501600 1502000 13 4;D5-99AL1_wp25 1500000 1500400 lbuuuuu IDUIzvv--- 0 100 200 300 400 500ftUS CD5-99 CD5-99A CD5-99AL1 P131 CD5-99AL1 WP25 Well Penetrations • Alpine C UJU Alpine B4 13 4;D5-99AL1_wp25 1500000 1500400 lbuuuuu IDUIzvv--- 0 100 200 300 400 500ftUS THE STATE GOVERNOR BILL WALKER Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Conservation Commission Re: Colville River Field, Alpine Oil Pool, CRU CD5-99AL 1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 216-124 Surface Location: 287' FNL, 2421' FEL, SEC. 18, TI IN, R4E, UM Bottomhole Location: 794' FNL, 1683' FEL, SEC. 34, TI IN, R4E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for permit to re -drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 216-122, API No. 50-103- 20748-01-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 914 — Cathy . Foerster Chair DATED this LQ�' ' Tay of October, 2016. STATE OF ALASKA AL. _KA OIL AND GAS CONSERVATION COMM .MON PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill f Lateral C4 Stratigraphic Test ❑ Development - Oil ❑✓ - Service - Winj ❑ Single Zone 0 • Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket 0 Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc., Bond No. 59-52-180 CRU CD5-99AL1 ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 27147 TVD: 7576 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 287' FNL, 2421' FEL, Sec. 18, T11 N, R4E, UM ASRC-NPR2, ASRC-NPR4, ADL387208, ADL387209 , Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 1027' FNL, 2576' FEL, Sec. 21, T11N, R4E, UM 932128, 932669, 932193, 932195 10/15/2016 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 794' FNL, 1683' FEL, Sec. 34, T11 N, R4E, UM 8838, 5032, 1146, 640 . 1731' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 70.2 • 15. Distance to Nearest Well Open Surface: x- 349559 y- 5965921 Zone- 4 GL Elevation above MSL (ft): 33.9 ' to Same Pool: 1352' 16. Deviated wells: Kickoff depth 5 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: a 8$ degrees Downhole: 3714 ' Surface: 2945- 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 94 H-40 Welded 80 36 36 116 116 10 yds. 13-1/2" 10-3/4" 45.5 L-80 H-563/BTC 2337 36 36 2337 2180 288bbl 11.Oppg, 51bb1 15.8 ppg G 9-7/8 x 11" 7-5/8" 29.7 L-80 H-563/BTC 15816 36 36 15816 7580 190 bbl 15.8 Class G 6-3/4" 4-1/2" 12.6 L-80 TXP 12167 14980 7467 27147 7576 n/a - uncemented liner with pert pups 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural 80.00 20" 10 yrds 116 116 Surface 2,337.00 10-3/4" 288bbl 11.0ppg, 51 bbl 15.8ppg 2337 2180 Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program 0 Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program 0 20 AAC 25.050 requirements 0 21. Verbal Approval: Commission Representative: Date``' 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not David Lee 263- 3A 1 be deviated from without prior written approval. Contact David. L. Lee(cDCop. com Email Printed Name Chip Alvord Title Drilling Manager -A Signature �, Lt /4 L jiGN!?�ne 265-6120 Date Commission Use Only Permit to Drill API Number: Permit Approval See cover letter for other Number: - 50 '03- 8-(,I- d3 Date: I0 II requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: 66P f�5 f f� 5U O �7 5 L 9 Samples req'd: YesNo [71 Mud log req'd: Yes ❑ o [✓f j-UU Yes Z No❑ Directional Yes [,✓ No❑ Z P5 2S measures: svy req'd: , Spacin7ception req'd: Yes F1 No [m✓J,( Inclination -only svy req'd: Yes ❑ No FZ' Post initial injection MIT req'd: Yes ❑ No APPROVED BY Approved by COMMISSIONER THE COMMISSION Date: O- 6 c`"0 k7z /0/3 Submit Form and Forrml10-4�1 (Revised 11/2015) i�'p� tI�1 t�r lonths from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 September 27, 2016 Alaska Oil and Gas Conservation Commission 333 West Th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-99AL1 Dear Sir or Madam: ConocoPhilli s p e SEP 2 8 2016 ConocoPhi�lips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig Doyon 19.//The intended spud date for this well is 10/15/16. CRU CD5-99AL 1 is planned to be an Alpine C Sand upper lateral drilled out of the CD5-99A parent well (covered in separate PTD). When the CD5-99AL1 is commenced, the parent well will have run and cemented 10-3/4" surface casing to above the C30 Sand. 7-5/8" intermediate casing will have been run and cemented to 500' above the uppermost hydrocarbon bearing interval. A 6-3/4" lateral will have been drilled in the Alpine A Sand and 4-1/2" solid liner with frac ports run across the productive interval. A whipstock will have been set above for the CD5-99AL 1 kickoff in the Alpine C Sand. The CD5-99AL1 6-3/4" lateral will then be horizontally drilled in the Alpine C sand. This lateral will be completed with a 4- 1/2" liner that will be dropped off just out side of the window (no junction tieing the L 1 lateral back to the motherbore). A 3.5" upper completion will then be run. A waiver is requested to set the Alpine A Sand production packer within 100' of the Alpine C sand window as per 20 AAC 25.283 (c). The prodution packer will be —50' below the Alpine C Sand window. Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application for Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact David Lee at 263-3741 (David.L.Lee(i cop.com) or Chip Alvord at 265-6120. Sincerely, cc: CD5-99 Well File / Ann Haggerty -Sherrod ATO 1530 Johnson Njoku ATO 1720 Chip Alvord ATO 1570 David Lee Jason McLennan ATO 1712 Drilling Engineer Lanston Chin Kuukpik Corp Applicatio❑ 3ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 CD5-99AL1 Application for Permit to Drill Document Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 (9)............................................................ 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................ 3 Requirements of 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of 20 AAC 25.005 (c)(4)) ........................ 4 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 (c) (5))......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) .......... 5 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) ......................... 5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .................................... 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) ......................................... 7 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(I1)) ........................ 7 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) ................................... 7 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) ......................... 7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 8 (Requirements of 20 AAC 25.005(c)(14))............................................................................. 8 15. Attachments............................................................................................................... 9 AttachmentI Cement Summary................................................................................................................. 9 CD5-99AL1 APD Page 1 of 15 Printed: 28 -Sep -16 Application permit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 Attachment 2 Drilling Hazards Summary ................................................................................................... 9 Attachment 3 Completion Schematic.......................................................................................................... 9 Attachment 4 Directional Plan.................................................................................................................. 9 CD5-99AL1 APD Page 2 of 15 Printed. 28 -Sep -16 Application .-lermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 1. Well Name (Requirements of 20 AAC 25.005 (fi) The well for which this application is submitted will be designated as CRU CD5-99AL1. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) Location at Surface 287' FNL, 2421' FEL, Sec. 18, TI IN, R4E, UM NAD 1927 RKB Elevation 70.2' AMSL Northings: 5,965,921 Total Vertical Depth, RKB: 7,467' Eastings: 349,559 Pad Elevation 33.9' AMSL Top of Productive Horizon (Heel) 1027' FNL, 2576' FEL, Sec. 21, TI IN, R4E, UM NAD 1927 Northings: 5,959,701 Eastings: 359,863 Measured Depth, RKB: 14,980' Total Vertical Depth, RKB: 7,467' Total Vertical Depth, SS: 7,397' Total Depth (Toe) 794' FNL, 1683' FEL, Sec. 34, TI IN, R4E, UM NAD 1927 Northings: 5,949,263 Eastings: 365,867 Measured Depth, RKB: 27,147' Total Vertical Depth, RKB: 7,576' Total Vertical Depth, SS. 7,506' Requirements of 20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 19. CD5-99AL 1 APD Page 3 of 15 Printed: 28 -Sep -16 Application .-lermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 4. Drilling Hazards Information (Requirements of20AAC25.005 (c)(4)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size in Csg Setting Depth MD/TVD ft Fracture Gradient(psi) Pore pressure ASP Drilling (psi) 20 116/116 10.9 52 54 10.75 2,337 / 2,185 14.5 977 1,429 7.625 15,816 / 7,581 12.5 3 714 2,945 4.5 27,147 / 7,576 12.5 3 703 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP= [(FG x 0.052) - 0.1]*D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in lb/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP =FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS 1. Drilling below 20" conductor ASP = [(FG x 0.052) - 0.1 ] D = [(10.9 x 0.052) - 0.1] x 116 = 54 psi OR ASP = FPP - (0.1 x D) = 977 - (0.1 x 2185') = 759 psi Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.1] D _ [(14.5 x 0.052) - 0.1] x 2185' = 1429 psi OR ASP = FPP - (0.1 x D) = 3714 - (0.1 x 7581') = 2954 psi Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1] D _ [(12.5 x 0.052) - 0.1 ] x 7576 = 4167 psi OR ASP = FPP - (0.1 x D) = 3703- (0.1 x 7576') = 2945 psi CD5-99AL 1 APD Page 4 of 15 Printed: 28 -Sep -16 Application . lermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of holeproblems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensityfor differential sticking; Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20 AAC 25.005 (e)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementing,Program Csg/Tbg Hole Size weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program OD (in) ) (Ib/ft) (ft) (ft) ({t) 20 42 94 H-40 Welded 80 36/36 116/116 Previously Installed HYD Cement to Surface with 10-3/4 13.5 45.5 L-80 563 X 2,337 36/36 2,337/ 2,180 288 bbl DeepCrete Lead 11.0 ppg, BTCM 51 bbl Class G Tail Slurry 15.8 ppg 7-5/8 85 9 29.7 L-80 HYD 63 X 15,816 36/36 15,816 / 7,580 190 bbl Class G at 15.8 ppg 11 BTCM 4-1/2 6.75 12.6 L-80 TXP 12,167 14,980 / 7,467 27,147 / 7,576 N/A — uncemented liner with pert pups 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) This PTD refers only to the CD5-99ALI production lateral, where the BOPE will be rigged up. The CD5-99A PTD details surface section and request for waiver of the diverter requirement under 20 AAC 25.035 (h) (2). CD5-99AL1 APD Page 5 of 15 Printed. 28 -Sep -16 Application , ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 8. Drilling Fluid Program (Requirements of20AAC25.005(c)(8)) Production Hole: The horizontal production interval will be drilled with an oil based mud drill -in fluid (Versapro) weighted to 9.5 ppg utilizing a 80:20 Oil Water Ratio and calcium carbonate. LVT-200 will be used as the base oil and CaC12 brine, 33% by weight for the water phase. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-99AL1 APD Page 6 of 15 Printed. 28 -Sep -16 Production Hole Size in. 6.75 Casing Size in. 4.5 Density PPG 9.5 PV cP 15-22 YP Ib./100 ftz 10-15 Initial Gels Ib./100 ftz 9-12 10 Minute Gels Ib./100 ftz 12-18 API Fluid Loss cc/30 min. <10 EHPHT Fluid Loss cc/30 min. <5 PH N/A Production Hole: The horizontal production interval will be drilled with an oil based mud drill -in fluid (Versapro) weighted to 9.5 ppg utilizing a 80:20 Oil Water Ratio and calcium carbonate. LVT-200 will be used as the base oil and CaC12 brine, 33% by weight for the water phase. Diagram of Doyon 19 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-99AL1 APD Page 6 of 15 Printed. 28 -Sep -16 Application( lermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 9. Abnormally Pressured Formation Information (Requirements of20AAC25.005 (c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20AAC25.005 (c)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of20 AAC 25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of20 AAC 25.005 (c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. End PTD for CD5-99A and begin PTD for CD5-99ALL 2. Pick up and run in hole with 6-3/4" drilling BHA. 3. Drill 6-3/4" hole to section TD (LWD Program: GR/RES) 4. Pull out of hole with drilling BHA. 5. RIH with 4.5" Alpine C sand lower completion (uncemented liner with perforated pups) 6. Release from liner (plop and drop) and POOH with running string, top of liner will be — 30' outside of the intermediate casing window. 7. RIH with 3.5" tubing with two HES TNT production packers. a. A waiver is requested to set the Alpine A Sand production packer within 100' of the Alpine C sand window as per 20 AAC 25.283 (c). The prodution packer will be —50' below the Alpine C Sand window. 8. Space out and land hanger. 9. Install BPV and pressure test hanger seals to 5000 psi. Nipple down BOP. 10. Install tubing head adapter assembly. Pressure test adapter assembly to 5000 psi. Remove BPV. 11. Test tubing and tubing -casing annulus separately to 3500 psi / 30 mins. Chart test. 12. Shear circulation valve in GLM. 13. Circulate tubing to diesel and install freeze protection in the annulus. 14. Set BPV and secure well. RDMO. CD5-99AL 1 APD Page 7 of 15 Printed: 28 -Sep -16 Application , ernnit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AA 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CD5-99AL1 will be injected into a permitted surface casing x production casing annulus on CD5. / The CD5-99A surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre -drill interpretations. There will be 500' of cement fill placed above the top of the Kuparuk reservoir. Once CD5-99A and CD5-99AL1 has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USD W's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2,185') + 1,500 psi = 2863 psi Pore Pressure = 977 psi Therefore Differential = 2863 — 977 = 1886 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85% of Burst 85% of (ppf) Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi CD5-99AL1 APD Page 8 of 15 Printed: 28 -Sep -16 15. Attachments Attachment I Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan Application ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 CD5-99AL 1 APD Page 9 of 15 Printed: 28 -Sep -16 Application ?ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 Attachment 1 — Cement Summary CD5-99AL1 Cementing ProjZram: CD5-99AL1 wp21 Schematic 20" 94# H-40 Welded Conductor to 116' ......I .......................... 10-3/4" 45.5# L-80 HYD563/BTCM 2,337' MD / 2,185' TVD @ 45° inc. ............................................. Top of Cement ...............5 922'.MD.............. K2 - Qannik 6, 422' MD / 4, 027' TVD s- HES Cementer 6, 614' MD / 4,10T TVD 9-7/8" x 11" Hole Top of Cement Kuparuk C 13,91.5'.MD./.7,1.04'. TVD_.... 14,415' MD / 7,316' TVD 7.5/8" 29.7 L-80 HYD563 X BTCM Casing 15,816' MD / 7,580' TVD @ 86° Alpine C \\`� 14,973,' MD / 7,466' TVD ..................... I ................... Alpine A i 15,762' MD / 7,596' TVD i I I 6-3/4" Hole i_____ i...27,000'.MD/.7,681. @90` CD5-99AL 1 APD Page 10 of 15 Printed: 28 -Sep -16 Application Permit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 10.75" Surface Casing run to 2,337' MD / 2,185' TVD Cement from 2337' MD to 1837'(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1837' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1335' MD), zero excess in 20" conductor. Lead slurry from 1,851' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (116'— 36) X 1.3645 ft3/ft X 1.0 (0% excess) = 109 ft3 Permafrost to Conductor (1,335'— 116 X 0.3637 ft3/ft X 3.5 (250% excess) = 1,552 ft3 Top of Tail to Permafrost (1,837'— 1,335 X 0.3637 ft3/ft X 1.5 (50% excess) = 274 ft3 Total Volume = 109 + 1,552 + 274 = 1,943 ft3 => 1003 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk Tail slurry from 2,337' MD to 1,837' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,337'-1,837) X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3 Shoe Joint (80� X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 15,816' MD / 7,580' TVD Top of slurry is designed to be at 13,915' MD, which is 500' above the Kuparuk C. Assume 40% excess annular volume. * 11" Under reamer is 120' above the 9-7/8" bit. Tail slurry from 15,816' MD to 13,915' MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8" Hole (15,816'— 15,696) X 0.2148 ft3/ft X 1.40 (40% excess) = 36 ft3 11" Hole to Top of Cement (15,696'— 13,915) X 0.3428 ft3/ft X 1.40 (40% excess) = 855 ft3 Shoe Joint (80� X 0.2578 ft3/ft X 1.0 (0% excess) = 21 ft3 Total Volume = 36+ 855 + 21 = 912 ft3 => 780 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.17 ft3/sk Second Stage from 7,200'MD to 6,428'MD with 15,8 ppg Class G + additives 772'MD Across Qannik (6,614 — 5,922) X 0.3428 tt3/ttX 1.40 (40% excess) = 332 ft3 Total Volume= 332 tt3 => 286 sx of 15,8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @a 1.16 Wlsk CD5-99AL 1 APD Page 11 of 15 Printed. 28 -Sep -16 Application 'ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 6-3/4" Open Hole Production Interval Event Risk Level Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers CD5-99AL1 APD Page 12 of 15 Printed: 28 -Sep -16 Application 'ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 Well Proximity Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset injection has the potential to increase reservoir pressure over predicted. Although this is unlikely, the rig will be prepared to weight up if required. MPD could also be utilized in order to control reservoir. CD5-99AL1 APD Page 13 of 15 Printed: 28 -Sep -16 Application 'ermit to Drill, Well CRU CD5-99AL1 Saved: 28 -Sep -16 Attachment 3 — Completion Schematic CD5 — 99A Alpine A/C Dual Lateral Producer Proposed Schematic 7 5/8" 29.7# L-80 Hyd 563 x BTC Intermediate Casing at 15,816' C sand Lateral MD 6 3/4" Hole TD 14,980'— 27,147' MD --—— — — — — ——----------------- —p — — — � i 4-/:" 12.6# L-80 TXP Liner w/ erf pups i i o 0 0 0 0 0 0 0 0 0 0 o Production Packer at ----------------------------------------1 14,617' MD ------------ -- CMU Sliding sleeve 4-/�" 12.6# L-80 TXP Liner w/ frac ports I for Selectivity o 0 0 0 0 0 0 0 0 0 0 • 14,633' 3-1/2" 9.3#TN110SS __ -__ _ Asand Lateral Production Packer at r 6 3/4" Hole TD 15,040' MD ZXP liner top packer (whipstock 15,816'- 27,000' MD base) at 15,116' MD Mirage Plug 15,07 5' CD5-99AL 1 APD Page 14 of 15 Printed: 28 -Sep -16 20" 94# H-40 Welded Upper Completion: Conductor to 116' MD 1) 3-1/2" 9.3#/ft eue8rd 2) Shallow X nipple profile 2.813" ID 3) 3-'/z" x 1" Camco KBMG GLM (xx°) w/DCK2 pinned for 2500 psi casing to tbg shear 4) TNT Packer 5) CMU sliding sleeve 6) X Nipple profile, 2.813" 7) TNT Packer 10-3l4" 45.5# L-80 HYD 563 8) XN Nipple profile, 2.813" x BTC 9) Mirage Plug Surface Casing at 2,337' MD Lower Completion: 7) Plop and drop liner in C sand no junction -4.5" 12.6# L-80 w/ perf pups 8) ZXP liner top packer & Flexlock Liner Hanger XO 5" Hydril 521 Box 4-%" IBTM pin 77 4.5" 12.6# L-80 w/ Frac Ports 3-1/2" 9.3# L-80 eue8rd 7 5/8" 29.7# L-80 Hyd 563 x BTC Intermediate Casing at 15,816' C sand Lateral MD 6 3/4" Hole TD 14,980'— 27,147' MD --—— — — — — ——----------------- —p — — — � i 4-/:" 12.6# L-80 TXP Liner w/ erf pups i i o 0 0 0 0 0 0 0 0 0 0 o Production Packer at ----------------------------------------1 14,617' MD ------------ -- CMU Sliding sleeve 4-/�" 12.6# L-80 TXP Liner w/ frac ports I for Selectivity o 0 0 0 0 0 0 0 0 0 0 • 14,633' 3-1/2" 9.3#TN110SS __ -__ _ Asand Lateral Production Packer at r 6 3/4" Hole TD 15,040' MD ZXP liner top packer (whipstock 15,816'- 27,000' MD base) at 15,116' MD Mirage Plug 15,07 5' CD5-99AL 1 APD Page 14 of 15 Printed: 28 -Sep -16 CD5-99AL1wp21.1 DDI 7.231 L5 (_CU Kalutii 1 AIpC 7-518" x 9-7/8" by 11 ' k n �- rn � HRZ` 0 Nr l rTi i -r I i i i rTl I 0 I ., 0 6000 12000 18000 24000 Measured Depth 0-0, 10-3l4" x 13-1 /2' Geodetic Datum: North American Datum 1983 Depth Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) o o Rig: Coyon 19 p p O O / & 000 oa 7-5/8" 01 ^ �O 00 O � 00 O 00 I O O � Z 1 0 0 2500 5000 7500 10000 12500 15000 17500 20000 22500 25000 Horizontal Departure 270 16000 18000 20000 22000 24000 26000 SURVEY PROGRAM i8� ladl Surface Location • r Depth From Depth To Survey/Plan Tool North / Y. 5965666.90 100.00 50000 CD5-99 Srvy 1 - SLB (Rig: CE=�C-SS East / X: 1489591.67 57296 572.96 2270..51 CD5-99 Srvy 2 - SLB_MWD_GMA49'g12iW.FGBH-99)Z-SC Pad Elevation: 33.90 2360.53 2390.00 CD5-99 Srvy 3 - SLB MWD+GMAVY FGR5-99)Z-SC 2390.00 14980.00 CD5-99Awp21.1 (Plan: CD5-99MWD+IFR-AK-CAZ-SC KIM 0,! CASING DETAILS 14980.00 15330.00 CD5-99AL1wp21.1 (Plan: CD5-99A11)INC+TREND 15330.00 16830.00 CD5-99AL1wp21.1 (Plan: CD5-99AL1) MWD TVD MD 15330.00 27146.95 CD5-99AL1wp21.1 (Plan: CD5-9iiM' IFR-AK-CAZ-SC r SECTION DETAILS Sec MD Inc Azi TVD +N/ -S +E/ -W Dleg TFace VSect Target 1 14980.00 80.00 121.00 7467.25 -6011.59 10427.97 0.00 0.00 10203.55 2 14992.80 81.76 119.97 7469.28 -6018.00 10438.86 15.90 -30.0010214.33 3 15022.80 78.76 119.97 7474.35 -6032.77 10464.47 10.00 -180.0010239.39 4 15072.64 80.00 118.72 7483.53 -6056.78 10507.17 3.50 -45.0010280.63 5 15 11 2.80 81.00 117.71 7490.16 -6075.50 10542.07 3.50 -45.0010313.55 6 15370.07 90.00 117.71 7510.34 -6194.66 10768.89 3.50 0.00 10525.24 7 15464.37 92.00 119.71 7508.69 -6239.95 10851.58 3.00 45.00 10604.05 8 16214.37 92.04 142.23 7481.92 -6728.24 11413.86 3.00 89.50 11299.17 9 16304.37 92.04 142.23 7478.71 -6799.34 11468.95 0.00 0.00 11387.80 10 1 6629 .82 89.45 151.64 7474.49 -7071.74 11646.27 3.00 105.30 11711.56 11 27147.47 89.45 151.64 7576.01 -16326.93 16641.48 0.00 0.00 22228.52 CD5-9911 03. Tae 072116 JD Name Plan Summary Annotation Start DLS 15.90 TFO -30.00 Start DLS 10.00 TFO -180.00 Start DLS 3.50 TFO -45.00 Start DLS 3.50 TFO -45.00 Start Build 3.50 Start DLS 3.00 TFO 45.00 HRZ Start DLS 3.00 TFO 89.50 Start 90.00 hold at 16214.77 MD Start DLS 3.00 TFO 105.30 Start 10517.28 hold at 16630.26 MD TO at 27147.53 Tied to Failed AC vs Kalubik CD5-99A wp21.1 Caned Anti-colliin a CD4 -322nd, CD5-99 7316.3 CD5-99A wp21.1 TCRs required for each LDD Minor Risked signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position and I approve thescan and Ilision avoidance Ian as set out in the audit ack. I approve it as the basis for the final well Ian and wellsite drawin s. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. Prepared by: Checked by: Accepted by: Approved by: E Bnj Potnis Nate Beck Ifeanyi Ifesie IEE 1 i8� ladl t+fJi�r e�eemIe ;� � , �u� • r i e KIM 0,! r r r Annotation Start DLS 15.90 TFO -30.00 Start DLS 10.00 TFO -180.00 Start DLS 3.50 TFO -45.00 Start DLS 3.50 TFO -45.00 Start Build 3.50 Start DLS 3.00 TFO 45.00 HRZ Start DLS 3.00 TFO 89.50 Start 90.00 hold at 16214.77 MD Start DLS 3.00 TFO 105.30 Start 10517.28 hold at 16630.26 MD TO at 27147.53 Tied to Failed AC vs Kalubik CD5-99A wp21.1 Caned Anti-colliin a CD4 -322nd, CD5-99 7316.3 CD5-99A wp21.1 TCRs required for each LDD Minor Risked signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all surrounding wells are assigned to the proper position and I approve thescan and Ilision avoidance Ian as set out in the audit ack. I approve it as the basis for the final well Ian and wellsite drawin s. I also acknowledge that unless notified otherwise all targets have a 100 feet lateral tolerance. Prepared by: Checked by: Accepted by: Approved by: E Bnj Potnis Nate Beck Ifeanyi Ifesie IEE , September 27 c CD5-11 CDS-313PB1 CD5-313 CD5-19L1wp08 (8D)-' CD5-19wp08 (8D) Easting (2000 usft/in) CD4 -26 Rig: CD:5-99 -32' CD4-304PB1 CD4 -318A CD4 -25 i CD4 -25L1 CD5-99Awp21.1 CD5-99AL1 wp21.1 CD5-17wp06 (6D) CD5-18L1wp06 (7D) CD5-18wp06 (7D) Easting (2000 usft/in) CD4 -24 318PB1 18 'B1 CD4 -96 CD4 -24P IN D4-319 z 0 Iq _r 7 di:irE CD4 -93 CD4 -93A -2500 0 c CD Z3 o 2500 N t CL m 5000 7500 10000 - CD5-99AL1wp21.1 Section View 00 10-3/4" x 13-1/2" O O O` 1000 O O N r N r N ,r � � r N N ,Q'® �000 Oo �Q �o 00 Q rn rn O O O rn ^00 00 00 X00 OO U, 00 00 �L r o0 O O O Or OOC) CD O Qr O O O O O �OO lfYp e -O O O fir 00 O O + N Do O OJ CO N mar r rr r r r CD4 N , rr r 7-5/8" x 9-7/8" by 11" o 0 2500 5000 7500 10000 12500 15000 17500 Vertical Section at 152.00° (2500 usft/in) 4-1/2" x 6-3/4" 20000 O O O` O O O N r N r N ,r � � r N N �Q rn Q rn rn L rn 20000 CD5-99AL1wp21.1 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. D4-322 -6000 Approach 7-5/8" x 9-7/8" by 11" with CD 4-322 -6500 CD5-99AL1 Polygon 092116 P c 7000 CD5-99AL1 02.Heel092216 P -1 ----- 0 0 Rig: CD5-99 X7500 --- Close Approach 0 with CD5-99 z 0 U) -8000 211 -8500— 8500 _9000- -9000 9500 9500 10000 10500 11000 11500 12000 12500 13000 13500 14000 West( -)/East(+) (500 usft/in) CD5-99AL1wp21.1 Plan View While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. F_ 10-3/4" x 13-1/2" 0 o° 7-5/8" x 9-7/8" by 11 " o° yo D4-322 -3500 0°o � o o ^o CD5-99AL1 02.Heel 092216 �P -7000 LCD5-99AL1 Polygon 092116 P "- + 0 z 0500 CD5-991_1 03. Toe 072116 D 0 U) 11 -14000 oP`�p2 4-1/2" x 6-3/4" 05 -17500- 0 3500 7000 10500 14000 17500 21000 24500 28000 West( -)/East(+) (3500 usft/in) CD5.99AL1wp21.1 Section View -I -2500 0 AO 0 10-3/4" x 13-1/2" I 0�� � 1 �00 CD o 2500— LO00 00 N Q 00 ^000 00 00 D 5000 `� moo 0o U 4-1/2" x 6-3/4" 00 �0 00 p Or p C) O O O O O O CO O r O O O O O O O` i Z 4 � C) O O o0 O O O p ` ~ rE3) O CMLOO N ON N N N N 7500 C) 7-5/8" x 9-7/8" by 11" CD CN 10000 Q rn Q LO rn LO 0 2500 5000 7500 10000 12500 15000 17500 20000 Vertical Section at 152.00° (2500 usft/in) CD5-99ALIwp21.1 Section View 7280- 280 7360- 7360— 7-5/8" x 9-7/8" by 11" 0 00 o c7440 0 0 � p o e- o0 o N O- O 0C) O °`° UJU o N �1 o0 0 Q7520 o 0) MO NCD0 0 Q Q NLO _ j 7600— AlpA aD L T� V/ LO 7680 C O 322 � rn rn 7760 0 10500 12000 13500 15000 16500 18000 19500 21000 22500 Vertical Section at 152.00° (1500 usft/in) ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 Plan: CD5-99AL1 Plan: CD5-99AL1wp21.1 Standard Proposal Report 27 September, 2016 Database: EDM Production Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99AL1 Design: CD5-99AL1wp21.1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Vertical TVD Dogleg Site CD5 Alpine West Pad Depth Site Position: Northing: 5,965,528.00 usft Latitude: 70° 18'47.778 N From: Map Easting: 1,489,252.00 usft Longitude: 151' 13'30.647 W Position Uncertainty: 0.00 usft Slot Radius: Grid Convergence: -1.15 ° (°) (usft) --13-3/16" (usft) WellRig: CD5-99 (°/100usft) (°1100usft) Well Position +N/ -S 0.00 usft Northing: 5,965,666.90 usft Latitude: 70° 18'49.211 N 7,467.25 +E/ -W 0.00 usft Easting: 1,489,591.67 usft Longitude: 151° 13'20.821 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 33.90 usft 0.00 - -- 119.97 7,469.28 7,398.83 -6,018.00 10,438.86 Wellbore Plan CD5-99A1-1 -8.03 -30.00 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 7,474.35 7,403.90 -6,032.77 (nT) 10.00 BGGM2016 10/1/2016 17.52 80.81 57,510 15,072.64 80.00 118.72 7,483.53 Design CD5-99A1-1wp21.1 10,507.17 3.50 Audit Notes: -2.51 -45.00 15,112.80 Version: Phase: PLAN Tie On Depth: 14,980.00 7,419.71 Vertical Section: Depth From (TVD) (usft) +N/ -S +E/ -W Direction (usft) (usft) (I 2.48 -2.51 36.55 0.00 0.00 152.00 90.00 Plan Sections Measured Vertical TVD Dogleg Build Turn Depth Inclination Azimuth Depth System +N/ -S +E/ -W Rate Rate Rate Tool Face (usft) (°) (°) (usft) usft (usft) (usft) (°1100usft) (°/100usft) (°1100usft) (°) 14,980.00 80.00 121.00 7,467.25 7,396.80 -6,011.59 10,427.97 0.00 0.00 0.00 0.00 14,992.80 81.76 119.97 7,469.28 7,398.83 -6,018.00 10,438.86 15.90 13.78 -8.03 -30.00 15,022.80 78.76 119.97 7,474.35 7,403.90 -6,032.77 10,464.47 10.00 -10.00 0.00 -180.00 15,072.64 80.00 118.72 7,483.53 7,413.08 -6,056.78 10,507.17 3.50 2.48 -2.51 -45.00 15,112.80 81.00 117.71 7,490.16 7,419.71 -6,075.50 10,542.07 3.50 2.48 -2.51 -45.00 15,370.07 90.00 117.71 7,510.34 7,439.89 -6,194.66 10,768.89 3.50 3.50 0.00 0.00 15,464.37 92.00 119.71 7,508.69 7,438.24 -6,239.95 10,851.58 3.00 2.12 2.12 45.00 16,214.37 92.04 142.23 7,481.92 7,411.47 -6,728.24 11,413.86 3.00 0.01 3.00 89.50 16,304.37 92.04 142.23 7,478.71 7,408.26 -6,799.34 11,468.95 0.00 0.00 0.00 0.00 16,629.82 89.45 151.64 7,474.49 7,404.04 -7,071.74 11,646.27 3.00 -0.80 2.89 105.30 27,147.47 89.45 151.64 7,576.01 7,505.56 -16,326.93 16,641.48 0.00 0.00 0.00 0.00 9/27/2016 11:21:41AM Page 2 COMPASS 5000.1 Build 74 Database: EDM Production Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD5 Alpine West Pad North Reference: Well: Rig: CD5-99 Survey Calculation Method: Wellbore: Plan: CD5-99AL1 Northing Design: CD5-99AL1wp21.1 Vert Section Planned Survey ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (') (1) (usft) usft (usft) (usft) (usft) (usft) 7,396.80 14,980.00 80.00 121.00 7,467.25 7,396.80 -6,011.59 10,427.97 5,959,447.51 1,499,896.01 0.00 10,203.55 14,980.40 80.06 120.97 7,467.32 7,396.87 -6,011.79 10,428.30 5,959,447.30 1,499,896.34 15.90 10,203.89 Start DLS 15.90 TFO -30.00 14,981.00 80.14 120.92 7,467.42 7,396.97 -6,012.10 10,428.81 5,959,446.98 1,499,896.84 15.90 10,204.40 7-518" x 9-7/8" by 11" 14,992.80 81.76 119.97 7,469.28 7,398.83 -6,018.00 10,438.86 5,959,440.88 1,499,906.77 15.90 10,214.33 14,993.20 81.72 119.97 7,469.33 7,398.88 -6,018.20 10,439.20 5,959,440.67 1,499,907.10 10.00 10,214.66 Start DLS 10.00 TFO -180.00 14,996.45 81.40 119.97 7,469.81 7,399.36 -6,019.80 10,441.98 5,959,439.01 1,499,909.85 10.00 10,217.38 CD5-99AL1 Polygon 092116 BP 14,997.18 81.33 119.97 7,469.92 7,399.47 -6,020.16 10,442.61 5,959,438.64 1,499,910.47 10.00 10,218.00 UJU 15,000.00 81.04 119.97 7,470.35 7,399.90 -6,021.56 10,445.02 5,959,437.20 1,499,912.86 10.00 10,220.36 15,022.80 78.76 119.97 7,474.35 7,403.90 -6,032.77 10,464.47 5,959,425.60 1,499,932.07 10.00 10,239.39 15,023.20 78.77 119.96 7,474.43 7,403.98 -6,032.97 10,464.81 5,959,425.40 1,499,932.41 3.50 10,239.72 Start DLS 3.50 TFO -45.00 15,072.64 80.00 118.72 7,483.53 7,413.08 -6,056.78 10,507.17 5,959,400.74 1,499,974.28 3.50 10,280.63 15,073.04 80.01 118.71 7,483.60 7,413.15 -6,056.96 10,507.51 5,959,400.55 1,499,974.62 3.50 10,280.96 Start DLS 3.50 TFO -45.00 15,100.00 80.68 118.03 7,488.12 7,417.67 -6,069.59 10,530.90 5,959,387.45 1,499,997.74 3.50 10,303.09 15,112.80 81.00 117.71 7,490.16 7,419.71 -6,075.50 10,542.07 5,959,381.32 1,500,008.79 3.50 10,313.55 15,113.20 81.01 117.71 7,490.22 7,419.77 -6,075.69 10,542.42 5,959,381.13 1,500,009.14 3.50 10,313.88 Start Build 3.50 15,200.00 84.05 117.71 7,501.51 7,431.06 -6,115.70 10,618.60 5,959,339.59 1,500,084.50 3.50 10,384.98 15,300.00 87.55 117.71 7,508.84 7,438.39 -6,162.08 10,706.88 5,959,291.46 1,500,171.82 3.50 10,467.37 15,370.07 90.00 117.71 7,510.34 7,439.89 -6,194.66 10,768.89 5,959,257.64 1,500,233.16 3.50 10,525.24 15,370.47 90.01 117.72 7,510.34 7,439.89 -6,194.84 10,769.25 5,959,257.45 1,500,233.51 3.00 10,525.58 Start DLS 3.00 TFO 45.00 15,400.00 90.63 118.35 7,510.17 7,439.72 -6,208.72 10,795.31 5,959,243.05 1,500,259.29 3.00 10,550.06 15,464.37 92.00 119.71 7,508.69 7,438.24 -6,239.95 10,851.58 5,959,210.70 1,500,314.91 3.00 10,604.05 15,464.77 92.00 119.73 7,508.68 7,438.23 -6,240.15 10,851.92 5,959,210.50 1,500,315.26 3.00 10,604.39 Start DLS 3.00 TFO 89.50 15,500.00 92.01 120.78 7,507.45 7,437.00 -6,257.88 10,882.33 5,959,192.15 1,500,345.30 3.00 10,634.33 15,600.00 92.03 123.79 7,503.92 7,433.47 -6,311.26 10,966.81 5,959,137.10 1,500,428.68 3.00 10,721.12 15,700.00 92.05 126.79 7,500.36 7,429.91 -6,368.98 11,048.38 5,959,077.75 1,500,509.07 3.00 10,810.38 15,800.00 92.06 129.79 7,496.78 7,426.33 -6,430.90 11,126.81 5,959,014.28 1,500,586.23 3.00 10,901.86 15,900.00 92.06 132.79 7,493.19 7,422.74 -6,496.83 11,201.89 5,958,946.85 1,500,659.97 3.00 10,995.33 16,000.00 92.06 135.79 7,489.59 7,419.14 -6,566.61 11,273.41 5,958,875.65 1,500,730.07 3.00 11,090.52 16,100.00 92.05 138.80 7,486.00 7,415.55 -6,640.04 11,341.18 5,958,800.88 1,500,796.35 3.00 11,187.17 16,200.00 92.04 141.80 7,482.43 7,411.98 -6,716.92 11,405.02 5,958,722.75 1,500,858.62 3.00 11,285.02 16,214.37 92.04 142.23 7,481.92 7,411.47 -6,728.24 11,413.86 5,958,711.25 1,500,867.23 3.00 11,299.17 16,214.77 92.04 142.23 7,481.90 7,411.45 -6,728.56 11,414.10 5,958,710.93 1,500,867.47 0.00 11,299.56 Start 90.00 hold at 16214.77 MD 16,300.00 92.04 142.23 7,478.87 7,408.42 -6,795.88 11,466.27 5,958,642.57 1,500,918.27 0.00 11,383.50 16,304.37 92.04 142.23 7,478.71 7,408.26 -6,799.34 11,468.95 5,958,639.07 1,500,920.88 0.00 11,387.80 9/27/2016 11:21:41AM Page 3 COMPASS 5000.1 Build 74 Database: EDM Production Local Co-ordinate Reference: Company: Conoco P hillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD5 Alpine West Pad North Reference: Well: Rig: CD5-99 Survey Calculation Method: Wellbore: Plan: CD5-99AL1 +E/ -W Design: CD5-99AL1wp21.1 DLS Planned Survey ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (1) (1) (usft) usft (usft) (usft) (usft) (usft) 7,408.25 16,304.77 92.04 142.24 7,478.70 7,408.25 -6,799.65 11,469.19 5,958,638.75 1,500,921.12 3.00 11,388.20 Start DLS 3.00 TFO 105.30 16,400.00 91.28 145.00 7,475.94 7,405.49 -6,876.28 11,525.65 5,958,561.01 1,500,976.02 3.00 11,482.36 16,500.00 90.48 147.89 7,474.41 7,403.96 -6,959.59 11,580.91 5,958,476.61 1,501,029.59 3.00 11,581.87 16,600.00 89.68 150.78 7,474.26 7,403.81 -7,045.60 11,631.91 5,958,389.60 1,501,078.85 3.00 11,681.75 16,629.82 89.45 151.64 7,474.49 7,404.04 -7,071.74 11,646.27 5,958,363.18 1,501,092.68 3.00 11,711.56 16,630.23 89.45 151.64 7,474.49 7,404.04 -7,072.09 11,646.46 5,958,362.82 1,501,092.86 0.00 11,711.97 CDS-99AL1 02.Heel 092216 BP 16,630.26 89.45 151.64 7,474.49 7,404.04 -7,072.12 11,646.48 5,958,362.80 1,501,092.88 0.00 11,712.00 Start 10517.28 hold at 16630.26 MD 16,700.00 89.45 151.64 7,475.16 7,404.71 -7,133.49 11,679.60 5,958,300.78 1,501,124.76 0.00 11,781.74 16,800.00 89.45 151.64 7,476.13 7,405.68 -7,221.49 11,727.09 5,958,211.85 1,501,170.47 0.00 11,881.73 16,900.00 89.45 151.64 7,477.09 7,406.64 -7,309.48 11,774.59 5,958,122.92 1,501,216.19 0.00 11,981.72 17,000.00 89.45 151.64 7,478.06 7,407.61 -7,397.48 11,822.08 5,958,034.00 1,501,261.90 0.00 12,081.72 17,100.00 89.45 151.64 7,479.02 7,408.57 -7,485.48 11,869.57 5,957,945.07 1,501,307.61 0.00 12,181.71 17,200.00 89.45 151.64 7,479.99 7,409.54 -7,573.47 11,917.07 5,957,856.14 1,501,353.32 0.00 12,281.70 17,300.00 89.45 151.64 7,480.95 7,410.50 -7,661.47 11,964.56 5,957,767.22 1,501,399.04 0.00 12,381.70 17,400.00 89.45 151.64 7,481.92 7,411.47 -7,749.47 12,012.05 5,957,678.29 1,501,444.75 0.00 12,481.69 17,500.00 89.45 151.64 7,482.88 7,412.43 -7,837.46 12,059.55 5,957,589.36 1,501,490.46 0.00 12,581.68 17,600.00 89.45 151.64 7,483.85 7,413.40 -7,925.46 12,107.04 5,957,500.44 1,501,536.18 0.00 12,681.68 17,700.00 89.45 151.64 7,484.82 7,414.37 -8,013.46 12,154.54 5,957,411.51 1,501,581.89 0.00 12,781.67 17,800.00 89.45 151.64 7,485.78 7,415.33 -8,101.45 12,202.03 5,957,322.58 1,501,627.60 0.00 12,881.66 17,900.00 89.45 151.64 7,486.75 7,416.30 -8,189.45 12,249.52 5,957,233.66 1,501,673.31 0.00 12,981.66 18,000.00 89.45 151.64 7,487.71 7,417.26 -8,277.45 12,297.02 5,957,144.73 1,501,719.03 0.00 13,081.65 18,100.00 89.45 151.64 7,488.68 7,418.23 -8,365.44 12,344.51 5,957,055.81 1,501,764.74 0.00 13,181.64 18,200.00 89.45 151.64 7,489.64 7,419.19 -8,453.44 12,392.00 5,956,966.88 1,501,810.45 0.00 13,281.64 18,300.00 89.45 151.64 7,490.61 7,420.16 -8,541.44 12,439.50 5,956,877.95 1,501,856.17 0.00 13,381.63 18,400.00 89.45 151.64 7,491.57 7,421.12 -8,629.43 12,486.99 5,956,789.03 1,501,901.88 0.00 13,481.63 18,500.00 89.45 151.64 7,492.54 7,422.09 -8,717.43 12,534.48 5,956,700.10 1,501,947.59 0.00 13,581.62 18,600.00 89.45 151.64 7,493.50 7,423.05 -8,805.43 12,581.98 5,956,611.17 1,501,993.30 0.00 13,681.61 18,700.00 89.45 151.64 7,494.47 7,424.02 -8,893.42 12,629.47 5,956,522.25 1,502,039.02 0.00 13,781.61 18,800.00 89.45 151.64 7,495.43 7,424.98 -8,981.42 12,676.96 5,956,433.32 1,502,084.73 0.00 13,881.60 18,900.00 89.45 151.64 7,496.40 7,425.95 -9,069.42 12,724.46 5,956,344.39 1,502,130.44 0.00 13,981.59 19,000.00 89.45 151.64 7,497.36 7,426.91 -9,157.41 12,771.95 5,956,255.47 1,502,176.16 0.00 14,081.59 19,100.00 89.45 151.64 7,498.33 7,427.88 -9,245.41 12,819.45 5,956,166.54 1,502,221.87 0.00 14,181.58 19,200.00 89.45 151.64 7,499.29 7,428.84 -9,333.41 12,866.94 5,956,077.61 1,502,267.58 0.00 14,281.57 19,300.00 89.45 151.64 7,500.26 7,429.81 -9,421.40 12,914.43 5,955,988.69 1,502,313.30 0.00 14,381.57 19,400.00 89.45 151.64 7,501.22 7,430.77 -9,509.40 12,961.93 5,955,899.76 1,502,359.01 0.00 14,481.56 19,500.00 89.45 151.64 7,502.19 7,431.74 -9,597.40 13,009.42 5,955,810.83 1,502,404.72 0.00 14,581.55 19,600.00 89.45 151.64 7,503.16 7,432.71 -9,685.40 13,056.91 5,955,721.91 1,502,450.43 0.00 14,681.55 19,700.00 89.45 151.64 7,504.12 7,433.67 -9,773.39 13,104.41 5,955,632.98 1,502,496.15 0.00 14,781.54 19,800.00 89.45 151.64 7,505.09 7,434.64 -9,861.39 13,151.90 5,955,544.06 1,502,541.86 0.00 14,881.53 19,900.00 89.45 151.64 7,506.05 7,435.60 -9,949.39 13,199.39 5,955,455.13 1,502,587.57 0.00 14,981.53 20,000.00 89.45 151.64 7,507.02 7,436.57 -10,037.38 13,246.89 5,955,366.20 1,502,633.29 0.00 15,081.52 20,100.00 89.45 151.64 7,507.98 7,437.53 -10,125.38 13,294.38 5,955,277.28 1,502,679.00 0.00 15,181.51 9/27/2016 11:21:41AM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips Standard Proposal Report Database: EDM Production Local Co-ordinate Reference: Well Rig: CD5-99 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Project: Western North Slope MD Reference: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Site: CD5 Alpine West Pad North Reference: True Well: Rig: CD5-99 Survey Calculation Method: Minimum Curvature Wellbore: Plan: CD5-99AL1 (usft) (°) Design: CD5-99AL1wp21.1 usft (usft) Planned Survey Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (°) (°) (usft) usft (usft) (usft) (usft) (usft) 7,438.50 20,200.00 89.45 151.64 7,508.95 7,438.50 -10,213.38 13,341.88 5,955,188.35 1,502,724.71 0.00 15,281.51 20,300.00 89.45 151.64 7,509.91 7,439.46 -10,301.37 13,389.37 5,955,099.42 1,502,770.42 0.00 15,381.50 20,400.00 89.45 151.64 7,510.88 7,440.43 -10,389.37 13,436.86 5,955,010.50 1,502,816.14 0.00 15,481.49 20,500.00 89.45 151.64 7,511.84 7,441.39 -10,477.37 13,484.36 5,954,921.57 1,502,861.85 0.00 15,581.49 20,600.00 89.45 151.64 7,512.81 7,442.36 -10,565.36 13,531.85 5,954,832.64 1,502,907.56 0.00 15,681.48 20,700.00 89.45 151.64 7,513.77 7,443.32 -10,653.36 13,579.34 5,954,743.72 1,502,953.28 0.00 15,781.47 20,800.00 89.45 151.64 7,514.74 7,444.29 -10,741.36 13,626.84 5,954,654.79 1,502,998.99 0.00 15,881.47 20,900.00 89.45 151.64 7,515.70 7,445.25 -10,829.35 13,674.33 5,954,565.86 1,503,044.70 0.00 15,981.46 21,000.00 89.45 151.64 7,516.67 7,446.22 -10,917.35 13,721.82 5,954,476.94 1,503,090.42 0.00 16,081.45 21,100.00 89.45 151.64 7,517.63 7,447.18 -11,005.35 13,769.32 5,954,388.01 1,503,136.13 0.00 16,181.45 21,200.00 89.45 151.64 7,518.60 7,448.15 -11,093.34 13,816.81 5,954,299.09 1,503,181.84 0.00 16,281.44 21,300.00 89.45 151.64 7,519.56 7,449.11 -11,181.34 13,864.30 5,954,210.16 1,503,227.55 0.00 16,381.43 21,400.00 89.45 151.64 7,520.53 7,450.08 -11,269.34 13,911.80 5,954,121.23 1,503,273.27 0.00 16,481.43 21,500.00 89.45 151.64 7,521.50 7,451.05 -11,357.33 13,959.29 5,954,032.31 1,503,318.98 0.00 16,581.42 21,600.00 89.45 151.64 7,522.46 7,452.01 -11,445.33 14,006.79 5,953,943.38 1,503,364.69 0.00 16,681.41 21,700.00 89.45 151.64 7,523.43 7,452.98 -11,533.33 14,054.28 5,953,854.45 1,503,410.41 0.00 16,781.41 21,800.00 89.45 151.64 7,524.39 7,453.94 -11,621.32 14,101.77 5,953,765.53 1,503,456.12 0.00 16,881.40 21,900.00 89.45 151.64 7,525.36 7,454.91 -11,709.32 14,149.27 5,953,676.60 1,503,501.83 0.00 16,981.39 22,000.00 89.45 151.64 7,526.32 7,455.87 -11,797.32 14,196.76 5,953,587.67 1,503,547.54 0.00 17,081.39 22,100.00 89.45 151.64 7,527.29 7,456.84 -11,885.31 14,244.25 5,953,498.75 1,503,593.26 0.00 17,181.38 22,200.00 89.45 151.64 7,528.25 7,457.80 -11,973.31 14,291.75 5,953,409.82 1,503,638.97 0.00 17,281.37 22,300.00 89.45 151.64 7,529.22 7,458.77 -12,061.31 14,339.24 5,953,320.89 1,503,684.68 0.00 17,381.37 22,400.00 89.45 151.64 7,530.18 7,459.73 -12,149.30 14,386.73 5,953,231.97 1,503,730.40 0.00 17,481.36 22,500.00 89.45 151.64 7,531.15 7,460.70 -12,237.30 14,434.23 5,953,143.04 1,503,776.11 0.00 17,581.35 22,600.00 89.45 151.64 7,532.11 7,461.66 -12,325.30 14,481.72 5,953,054.12 1,503,821.82 0.00 17,681.35 22,700.00 89.45 151.64 7,533.08 7,462.63 -12,413.29 14,529.21 5,952,965.19 1,503,867.54 0.00 17,781.34 22,800.00 89.45 151.64 7,534.04 7,463.59 -12,501.29 14,576.71 5,952,876.26 1,503,913.25 0.00 17,881.33 22,900.00 89.45 151.64 7,535.01 7,464.56 -12,589.29 14,624.20 5,952,787.34 1,503,958.96 0.00 17,981.33 23,000.00 89.45 151.64 7,535.97 7,465.52 -12,677.28 14,671.70 5,952,698.41 1,504,004.67 0.00 18,081.32 23,100.00 89.45 151.64 7,536.94 7,466.49 -12,765.28 14,719.19 5,952,609.48 1,504,050.39 0.00 18,181.32 23,200.00 89.45 151.64 7,537.90 7,467.45 -12,853.28 14,766.68 5,952,520.56 1,504,096.10 0.00 18,281.31 23,300.00 89.45 151.64 7,538.87 7,468.42 -12,941.27 14,814.18 5,952,431.63 1,504,141.81 0.00 18,381.30 23,400.00 89.45 151.64 7,539.84 7,469.39 -13,029.27 14,861.67 5,952,342.70 1,504,187.53 0.00 18,481.30 23,500.00 89.45 151.64 7,540.80 7,470.35 -13,117.27 14,909.16 5,952,253.78 1,504,233.24 0.00 18,581.29 23,600.00 89.45 151.64 7,541.77 7,471.32 -13,205.26 14,956.66 5,952,164.85 1,504,278.95 0.00 18,681.28 23,700.00 89.45 151.64 7,542.73 7,472.28 -13,293.26 15,004.15 5,952,075.92 1,504,324.66 0.00 18,781.28 23,800.00 89.45 151.64 7,543.70 7,473.25 -13,381.26 15,051.64 5,951,987.00 1,504,370.38 0.00 18,881.27 23,900.00 89.45 151.64 7,544.66 7,474.21 -13,469.26 15,099.14 5,951,898.07 1,504,416.09 0.00 18,981.26 24,000.00 89.45 151.64 7,545.63 7,475.18 -13,557.25 15,146.63 5,951,809.14 1,504,461.80 0.00 19,081.26 24,100.00 89.45 151.64 7,546.59 7,476.14 -13,645.25 15,194.12 5,951,720.22 1,504,507.52 0.00 19,181.25 24,200.00 89.45 151.64 7,547.56 7,477.11 -13,733.25 15,241.62 5,951,631.29 1,504,553.23 0.00 19,281.24 24,300.00 89.45 151.64 7,548.52 7,478.07 -13,821.24 15,289.11 5,951,542.37 1,504,598.94 0.00 19,381.24 24,395.96 89.45 151.64 7,549.45 7,479.00 -13,905.69 15,334.69 5,951,457.03 1,504,642.81 0.00 19,477.19 CDS-99L1 02.Toe 041916 JD 24,400.00 89.45 151.64 7,549.49 7,479.04 -13,909.24 15,336.61 5,951,453.44 1,504,644.65 0.00 19,481.23 9/27/2016 11:21:41AM Page 5 COMPASS 5000.1 Build 74 Database: EDM Production Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD5 Alpine West Pad North Reference: Well: Rig: CD5-99 Survey Calculation Method: Wellbore: Plan: CD5-99AL1 +E/ -W Design: CD5-99AL1wp21.1 DLS Planned Survey ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Measured Vertical Map Map Depth Inclination Azimuth Depth TVDss +N/ -S +E/ -W Northing Easting DLS Vert Section (usft) (') (1) (usft) usft (usft) (usft) (usft) (usft) 7,480.00 24,500.00 89.45 151.64 7,550.45 7,480.00 -13,997.24 15,384.10 5,951,364.51 1,504,690.37 0.00 19,581.22 24,600.00 89.45 151.64 7,551.42 7,480.97 -14,085.23 15,431.59 5,951,275.59 1,504,736.08 0.00 19,681.22 24,700.00 89.45 151.64 7,552.38 7,481.93 -14,173.23 15,479.09 5,951,186.66 1,504,781.79 0.00 19,781.21 24,800.00 89.45 151.64 7,553.35 7,482.90 -14,261.23 15,526.58 5,951,097.73 1,504,827.51 0.00 19,881.20 24,900.00 89.45 151.64 7,554.31 7,483.86 -14,349.22 15,574.07 5,951,008.81 1,504,873.22 0.00 19,981.20 25,000.00 89.45 151.64 7,555.28 7,484.83 -14,437.22 15,621.57 5,950,919.88 1,504,918.93 0.00 20,081.19 25,100.00 89.45 151.64 7,556.24 7,485.79 -14,525.22 15,669.06 5,950,830.95 1,504,964.65 0.00 20,181.18 25,200.00 89.45 151.64 7,557.21 7,486.76 -14,613.21 15,716.55 5,950,742.03 1,505,010.36 0.00 20,281.18 25,300.00 89.45 151.64 7,558.18 7,487.73 -14,701.21 15,764.05 5,950,653.10 1,505,056.07 0.00 20,381.17 25,400.00 89.45 151.64 7,559.14 7,488.69 -14,789.21 15,811.54 5,950,564.17 1,505,101.78 0.00 20,481.16 25,500.00 89.45 151.64 7,560.11 7,489.66 -14,877.20 15,859.04 5,950,475.25 1,505,147.50 0.00 20,581.16 25,600.00 89.45 151.64 7,561.07 7,490.62 -14,965.20 15,906.53 5,950,386.32 1,505,193.21 0.00 20,681.15 25,700.00 89.45 151.64 7,562.04 7,491.59 -15,053.20 15,954.02 5,950,297.40 1,505,238.92 0.00 20,781.14 25,800.00 89.45 151.64 7,563.00 7,492.55 -15,141.19 16,001.52 5,950,208.47 1,505,284.64 0.00 20,881.14 25,900.00 89.45 151.64 7,563.97 7,493.52 -15,229.19 16,049.01 5,950,119.54 1,505,330.35 0.00 20,981.13 26,000.00 89.45 151.64 7,564.93 7,494.48 -15,317.19 16,096.50 5,950,030.62 1,505,376.06 0.00 21,081.12 26,100.00 89.45 151.64 7,565.90 7,495.45 -15,405.18 16,144.00 5,949,941.69 1,505,421.77 0.00 21,181.12 26,200.00 89.45 151.64 7,566.86 7,496.41 -15,493.18 16,191.49 5,949,852.76 1,505,467.49 0.00 21,281.11 26,300.00 89.45 151.64 7,567.83 7,497.38 -15,581.18 16,238.98 5,949,763.84 1,505,513.20 0.00 21,381.10 26,400.00 89.45 151.64 7,568.79 7,498.34 -15,669.17 16,286.48 5,949,674.91 1,505,558.91 0.00 21,481.10 26,500.00 89.45 151.64 7,569.76 7,499.31 -15,757.17 16,333.97 5,949,585.98 1,505,604.63 0.00 21,581.09 26,600.00 89.45 151.64 7,570.72 7,500.27 -15,845.17 16,381.46 5,949,497.06 1,505,650.34 0.00 21,681.08 26,700.00 89.45 151.64 7,571.69 7,501.24 -15,933.16 16,428.96 5,949,408.13 1,505,696.05 0.00 21,781.08 26,800.00 89.45 151.64 7,572.65 7,502.20 -16,021.16 16,476.45 5,949,319.20 1,505,741.77 0.00 21,881.07 26,900.00 89.45 151.64 7,573.62 7,503.17 -16,109.16 16,523.95 5,949,230.28 1,505,787.48 0.00 21,981.06 27,000.00 89.45 151.64 7,574.58 7,504.13 -16,197.15 16,571.44 5,949,141.35 1,505,833.19 0.00 22,081.06 27,100.00 89.45 151.64 7,575.55 7,505.10 -16,285.15 16,618.93 5,949,052.42 1,505,878.90 0.00 22,181.05 27,147.47 89.45 151.64 7,576.01 7,505.56 -16,326.92 16,641.48 5,949,010.21 1,505,900.60 0.00 22,228.52 TD at 27147.63 - 4-1/2" x 6-3/4" - CDS-99L1 03. Toe 072116 JD 9/27/2016 11:21:41AM Page 6 COMPASS 5000.1 Build 74 Database: EDM Production Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD5 Alpine West Pad North Reference: Well: Rig: CD5-99 Survey Calculation Method: Wellbore: Plan: CD5-99AL1 Easting Design: CD5-99AL1wp21.1 (usft) ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Targets Measured Vertical Casing Hole Target Name Depth Diameter Diameter (usft) (usft) Name C') C') hit/miss target Dip Angle Dip Dir. TVD +Nl-S +E/ -W Northing Easting Shape (1) V) (usft) (usft) (usft) (usft) (usft) CD5-991-1 03. Toe 072116 JD 0.00 0.00 7,576.01 -16,326.93 16,641.48 5,949,010.21 1,505,900.61 plan hits target center 0.00 13,692.38 7,018.73 HRZ 0.00 Circle (radius 100.00) CD5-99AL1 Polygon 092116 BP 0.00 0.00 7,576.01 -6,011.81 10,428.32 5,959,447.28 1,499,896.36 plan misses target center by 107.37usft at 14996.75usft MD (7469.86 TVD, -6019.95 N, 10442.24 E) Polygon Point 1 7,576.01 0.00 0.00 5,959,447.28 1,499,896.36 Point 2 7,576.01 -248.58 408.92 5,959,190.55 1,500,300.17 Point 3 7,576.01 -768.47 931.66 5,958,660.31 1,500,812.33 Point 7,576.01 -1,112.69 1,133.21 5,958,312.13 1,501,006.91 Point 5 7,576.01 -1,371.80 1,272.86 5,958,050.29 1,501,141.31 Point 6 7,576.01 -10,362.62 6,125.15 5,948,964.49 1,505,811.67 Point 7 7,576.01 -10,267.61 6,301.17 5,949,055.93 1,505,989.55 Point 8 77576.01 -1,276.80 1,448.88 5,958,141.73 1,501,319.19 Point 9 7,576.01 -1,033.92 1,260.88 5,958,388.32 1,501,136.12 Point 10 7,576.01 -647.57 1,058.21 5,958,778.63 1,500,941.27 Point 11 7,576.01 -147.47 482.42 5,959,290.16 1,500,375.68 Point 12 7,576.01 44.02 23.73 5,959,490.81 1,499,920.97 CD5-991102.Toe041916 JD 0.00 0.00 7,550.45 -13,901.80 15,341.87 5,951,460.77 1,504,650.07 plan misses target center by 8.23usft at 24395.96usft MD (7549.45 TVD, -13905.69 N, 15334.69 E) Circle (radius 100.00) CD5-99AL1 02.Heel092216 BP 0.00 0.00 7,474.56 -7,071.99 11,646.65 5,958,362.92 1,501,093.05 plan misses target center by 0.22usft at 16630.23usft MD (7474.49 TVD, -7072.09 N, 11646.46 E) Circle (radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name C') C') 14,981.00 7,467.42 7-5/8" x 9-7/8" by 11" 7-5/8 11 27,147.47 7,576.01 4-1/2"x6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Vertical Dip Depth Depth Depth SS Dip Direction (usft) (usft) Name Lithology (1) (�) 14,997.18 7,469.92 UJU 0.00 14,973.39 7,466.10 AlpC 0.00 14,415.67 7,316.30 LCU 0.00 14,118.30 7,193.96 Kalubik 0.00 13,692.38 7,018.73 HRZ 0.00 9/27/2016 11:21:41AM Page 7 COMPASS 5000.1 Build 74 Database: EDM Production Company: Conoco Ph ill ips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99AL1 Design: CD5-99AL1wp21.1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +El -W (usft) (usft) (usft) (usft) Comment 14,980.40 7,467.32 -6,011.79 10,428.30 Start DLS 15.90 TFO -30.00 14,993.20 7,469.33 -6,018.20 10,439.20 Start DLS 10.00 TFO -180.00 15,023.20 7,474.43 -6,032.97 10,464.81 Start DLS 3.50 TFO -45.00 15,073.04 7,483.60 -6,056.96 10,507.51 Start DLS 3.50 TFO -45.00 15,113.20 7,490.22 -6,075.69 10,542.42 Start Build 3.50 15,370.47 7,510.34 -6,194.84 10,769.25 Start DLS 3.00 TFO 45.00 15,464.77 7,508.68 -6,240.15 10,851.92 Start DLS 3.00 TFO 89.50 16,214.77 7,481.90 -6,728.56 11,414.10 Start 90.00 hold at 16214.77 MD 16,304.77 7,478.70 -6,799.65 11,469.19 Start DLS 3.00 TFO 105.30 16,630.26 7,474.49 -7,072.12 11,646.48 Start 10517.28 hold at 16630.26 MD 27,147.47 7,576.01 -16,326.93 16,641.48 TD at 27147.53 9/27/2016 11:21:41AM Page 8 COMPASS 5000.1 Build 74 ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 Plan: CD5-99AL1 50-103-20748-00-00 CD5-99AL1wp21.1 Clearance Summary Anticollision Report 27 September, 2016 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CDS Alpine West Pad - Rig: CD5-99 - Plan: CDS-99AL1 - CD5-99AL1wp21.1 Well Coordinates: 5,965,666.90 N, 1,489,591.67 E (70° 18'49.21" N, 151° 13'20.82" W) Datum Height: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Scan Range: 14,980.00 to 27,147.47 usft. Measured Depth. Scan Radius is 2,911.09 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 Failed Anti -Collision Con ocoPhillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CDS-99 - CD5-99AL1wp21.1 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: CDS-99ALl - CD5-99AL1wp21.1 Scan Range: 14,980.00 to 27,147.47 usft. Measured Depth. Scan Radius is 2,911.09 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Ellipse @Measured Clearance Summary Based on Site Name Depth Distance Depth Separation Depth Factor Minimum Separation Warning Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) (usft) usft CD4 Nanuq Pad CD4 -26 - CD4 -26 - CD4 -26 23,835.78 1,322.36 23,835.78 836.82 16,425.00 2.723 Clearance Factor Pass - Major Risk CD4 -318 -CD4 -318A -CD4 -318A 25,380.61 2,588.84 25,380.61 2,111.29 15,400.00 5.421 Clearance Factor Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,765.86 650.79 21,765.86 393.33 17,200.00 2.528 Centre Distance Pass - Major Risk CD4 -321 - CD4 -321 - CD4 -321 21,713.44 693.60 21,713.44 333.68 17,450.00 1.927 Clearance Factor Pass - Major Risk CD4 -322 - CD4 -322 - CD4 -322 15,330.00 M9,125.00 0.422 Clearance Factor FAIL - M#br Risk CD4 -322 - CD4 -322 - CD4 -322 MWD M9,275.00 0.475 Centre Distance FAIL -isk CD5 Alpine West Pad Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp06 (6D) 14,980.00 1,108.78 14,980.00 671.49 15,575.00 2.536 Clearance Factor Pass - Major Risk Rig: CD5-99 - Plan: CD5-99A - CD5-99Awp21.1 42 Ce istance Rig: CD5-99 - Plan: CD5-99A - CD5-99Awp21.1 WMeFactor]F�L-MajorRisk Risk Rig: CD5-99 - Rig: CD5-99 - Rig: CD5-99 Factor Rig: CD5-99 - Rig: CD5-99 - Rig: CD5-99 stance Risk Survey too/ program From To Survey/Plan Survey Tool (usft) (usft) 100.00 500.00 GYD-GC-SS 572.96 2,270.51 MWD+IFR-AK-CAZ-SC 2,360.53 2,390.00 MWD+IFR-AK-CAZ-SC 2,390.00 14, 980.00 M W D+I F R-AK-CAZ-SC 14,980.00 15,330.00 CD5-99AL1wp21.1 INC+TREND 15,330.00 16,830.00 CD5-99AL1wp21.1 MWD 15,330.00 27,146.95 CD5-99AL1wp21.1 MWD+IFR-AK-CAZ-SC 27 September, 2016 - 10:48 Page 2 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CDS-99 - CD5-99AL1wp21.1 Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 27 September, 2016 - 10:48 Page 3 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 Plan: CD5-99AL1 50-103-20748-00-00 CD5-99AL1wp21.1 Clearance Summary Minor Risked Anticollision Report 27 September, 2016 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: CD5 Alpine West Pad - Rig: CD5-99 - Plan: CD5-99AL1 - CD5-99AL1wp21.1 Well Coordinates: 5,965,666.90 N, 1,489,591.67 E (70° 18'49.21" N, 151° 13' 20.82" W) Datum Height: CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) Scan Range: 14,980.00 to 27,147.47 usft. Measured Depth. Scan Radius is 2,911.09 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Geodetic Scale Factor Applied Version: 5000.1 Build: 74 Scan Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Scan Type: 25.00 Anticollision Report for Rig: CD5-99 - CD5-99AL1wp21.1 Tray. Cylinder North Proximity Scan on Current Survey Data (North Reference) Reference Design: C05 Alpine West Pad - Rig: CD5-99 - Plan: CDS-99AL1 - CD5-99AL1wp21.1 Scan Range: 14,980.00 to 27,147.47 usft. Measured Depth. Scan Radius is 2,911.09 usft. Clearance Factor cutoff is Unlimited. Max Ellipse Separation is Unlimited Measured Minimum @Measured Site Name Depth Distance Depth Comparison Well Name - Wellbore Name - Design (usft) (usft) (usft) CD4 Nanuq Pad CD4 -26 - CD4 -26 - CD4 -26 CD4 -318 - CD4 -318A- CD4 -318A CD4 -321 - CD4 -321 - CD4 -321 CD4 -321 - CD4 -321 - CD4 -321 CD4 -322 - CD4 -322 - CD4 -322 CD4 -322 - CD4 -322 - CD4 -322 CD5 Alpine West Pad Plan: CD5-17 (6D) - Plan: CD5-17 - CD5-17wp06 (6D) Rig: CD5-99 - Plan: CD5-99A- CD5-99Awp21.1 Rig: CD5-99 - Rig: CD5-99 - Rig: CD5-99 SurveV tool program ConocoPhillips(Alaska) Inc. -WNS Western North Slope Ellipse @Measured Clearance Summary Based on Separation Depth Factor Minimum Separation Warning (usft) usft 23,835.78 1,322.36 23,835.78 836.84 16,425.00 2.724 Clearance Factor Pass - Major Risk 25,380.61 2,588.84 25,380.61 2,111.31 15,400.00 5.421 Clearance Factor Pass - Major Risk 21,765.86 650.79 21,765.86 393.33 17,200.00 2.528 Centre Distance Pass - Major Risk 21,713.44 693.60 21,713.44 333.69 17,450.00 1.927 Clearance Factor Pass - Major Risk 16,233.16 210.93 16,233.16 199.08 19,250.00 17.789 Clearance Factor Pass - Minor 1/20 16,220.62 210.50 16,220.62 199.57 19,275.00 19.262 Centre Distance Pass - Minor 1/20 14,980.00 1,108.78 14,980.00 671.52 15,575.00 2.536 Clearance Factor Pass - Major Risk 16,577.54 126.49 16,577.54 125.75 16,500.00 173.228 Clearance Factor Pass - Minor 1/10 From To (usft) (usft) 100.00 500.00 572.96 2,27D.51 2,360.53 2,39D.00 2,390.00 14, 980.00 14,980.00 15,330.00 CD5-99AL1wp21.1 15,330.00 16,830.00 CD5-99AL1wp21.1 15,330.00 27,146.95 CD5-99AL1wp21.1 Survey/Plan Survey Tool GYD-GC-SS M WD+I FR-AK-CAZ-SC M W D+I F R-AK-CAZ-SC M W D+I F R-AK-CAZ-SC INC+TREND MWD M W D+I F R -A K-CAZ-SC 27 September, 2016 - 13:12 Page 2 of 5 COMPASS ConocoPhillips(Alaska) Inc. -WNS Western North Slope Anticollision Report for Rig: CD5-99 - CD5-99AL1wp21.1 Ellipse error terms are correlated across survey tool tie -on points. Calculated ellipses incorporate surface errors. Separation is the actual distance between ellipsoids. Distance Between centres is the straight line distance between wellbore centres. Clearance Factor = Distance Between Profiles / (Distance Between Profiles - Ellipse Separation). All station coordinates were calculated using the Minimum Curvature method. 27 September, 2016 - 13:12 Page 3 of 5 COMPASS !016 Ladder View 10:55, September 27 CD5-99AL1 wp21.1 The Reference Well is along the X-axis. Error Ellipses are the Sum of the Reference and Offset Well Errors. 300 N O C O ! L C: 150— 50 a) a) Equivelant Magnetic Distanc 16000 18000 20000 22000 24000 26000 Displayed interval could be less than entire well:Measured Dept19498O.00 To 27147.47 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 100.00 500.00 CD5-99 Srvy 1 - SLB_GYD-GC-SS'gRq-GMSS9) 746714®81708/8" x 9-7/8" by 11" 572.96 2270.51 CD5-99 Srvy 2 - SLB_ MWD _GMAGI'(WFI6R5*9PAZ-SC 75762YT47.47 4-1/2" x 6-3/4" 2360.53 2390.00 CD5-99 Srvy 3 - SLB_MWD+GMA91 NW. 16B5*SrAZ-SC 2390.0014980.00 CD5-99Awp21.1 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 14980.0015330.00 CD5-99AL1wp21.1 (Plan: CD5-99ANQa+TREND 15330.0016830.00 CD5-99AL1wp21.1 (Plan: CD5-99A111IVD 15330.00 27146.95 CD5-99AL1wp21.1 (Plan: CD5-99fA11UVD+IFR-AK-CAZ-SC a 3 a 0 U 60 O I (6 N I C 30 j U Equivelant Magnetic Distance 0 15300 15750 16200 16650 17100 17550 18000 Partial Measured Depth !016 Ladder 13:18, Ser eptemb27 View CD5-99AL1 w 21.1 The ReferenceWell is along the X-axis. rror Ellipses are the Sum of the Reference and Offset Well Errors Minor Risked 300 c O (6 (B !3. N ',.. i n 150 3 U C (D U 0 Equivelant Magnetic Distance 18000 20000 22000 24000 26000 Displayed interval could be less than entire well:Measured DeptA4980.00 To 27147.47 SURVEY PROGRAM CASING DETAILS Depth From Depth To Survey/Plan Tool TVD MD Name 100.00 500.00 CD5-99 Srvy 1 - SLB_GYD-GC-SSC IRR-9D5i99) 746714Z81706/8" x 9-7/8" by 11" 572.96 2270.51 CD5-99 Srvy 2 - SLB—MWD GMAGI I685W4 FDAZ-SC 75762Y1147.47 4-1/2" x 6-3/4" 2360.53 2390.00 CD5-99 Srvy 3 - SLB_MWD+GMAGI` R1V.16@5*99fAZ-SC 2390.0014980.00 CD5-99Awp21.1 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 14980.0015330.00 CD5-99AL1wp21.1 (Plan: CD5-99ALIO+TREND 15330.0016830.00 CD5-99AL1wp21.1 (Plan: CD5-99AILV D 15330.00 27146.95 CD5-99AL1wp21.1 (Plan: CD5-99/A1114D+IFR-AK-CAZ-SC 3 0 U 0 60— m (D tn 30— 0 U C) N Equivelant Magnetic Distance 0 15000 15500 16000 16500 17000 17500 18000 18500 Partial Measured Depth CDS-99AL1 wp21.1 i MD 15190" 4980.00 14980.00 To 27147.47 4992.80 15560 5022.80 15750 5072.64 13:14, September 27 2016 5112.8 0 16120 5370.07 CASING DETAILS ]5464.37 16750 16750 6214.37 TVD MD Nam 6304.37 7467.42 14981.00-5/8" x 9-7/8" by 11" 6629.82 7576.01 27147.47 4-1/2" x 6-3/4' 7147.47 Y/F - -ms-ss, - i cei�-� 9Arns+xea-ae-cxz-sc -E -12 i Inc Azi TVD D1eg TFace Target 80.00 121.00 7467.25 0.00 0.00 81.76 119.97 7469.28 15.90 -30.00 78.76 119.97 7474.35 10.00 -180.00 80.00 118.72 7483.53 3.50 -45.00 81.00 117.71 7490.16 3.50 -45.00 90.00 117.71 7510.34 3.50 0.00 92.00 119.71 7508.69 3.00 45.00 92.04 142.23 7481.92 3.00 89.50 92.04 142.23 7478.71 0.00 0.00 89.45 151.64 74 74 .4 9 3.00 105.30 89.45 151.64 7576.01 0.00 0.00 CD5-99L1 03. Toe 072116 7 Minor Risked GD4-322 0/360 15005 15190 15190" 15380 15380 15560 15560 15750 15750 15930 15930 16120 16120 16300 16300 16750 16750 17200 17200 _ 17650 17650 18100 18100 18550 18550 19000 19000 19450 19450 19900 19900 20810 20810 21720 21720 22630 22630 23540 23540 24450 24450 25350 25350 26260 26260 27172 G 0:57, September 27 O d "ZiI.AY — 1 4 od In 0) \\\ 1. O - "D5 Abine WestPad 0 c �D m to O o O M_ � o C o Z O 0 0 0 0 rn 0 0 M Easting (3000 usft/in) \ vV CD5-01 CD5-05 CD5-06 1 D5-08 CD4 -26 CD5-06 CD5-11 Rig: CD -99 CD5-313PB1 CD5-313 F CD5-17wp06 (6D) \ AC wells ONLY (NOT a Spider) CD4 -318A CD5-99Awp21.1 CD5-99AL1 wp21.1 1485000 1486500 1488000 1489500 1491000 1492500 1494000 1495500 1497000 149850D 1500000 1501500 1503000 1504500 1506000 1507500 1509000 1510500 1512000 1513500 Easting (3000 usft/in) Z O S w O O O c y CD5-99ALlwp21.1 4 75 14980.00 To 16000.00 Survey Program MD Azi Depth To 14980.00 121.00 -.00 14992.80 119.97 -3 15022.80 119.97 CDS-99 Srvy z -SLB MWD GMAG(Rig: CD5-gMWD+IFR-AK-CAZ-SC 15072.64 118.72 z39a.o0 15112.80 117.71 2390.D0 15370.07 117.71 6o/300 15464.37 119.71 CD5-9 gAL1wp21.1(Plan: CD5-99AL1) INC+TREND 16214.37 142.23 16830.00 16304.37 142.23 15330.00 16629.82 151.64 19900 27147.47 151.64 21720 21720 - 0 / 270 23540 23540 Casing Details 0/33 14980 15005 Survey Program 'D MD Name 67.42 14981.00 7.5/8"x 9-7/8" by 11" Depth From Depth To Survey/Plan Tool 76.01 27147.47 4-1/2" x 6-3/4" -.00 5 00.00 CD 5-99 Srvy 1 - SLB GVD-GC-SS (Rig: CD5-99) GYD-GC-55 15750 572.96 227D 51 CDS-99 Srvy z -SLB MWD GMAG(Rig: CD5-gMWD+IFR-AK-CAZ-SC 16120 z36o.53 z39a.o0 CD5-99 Srvy3-SLB_MWD+GMAC (Rig:CD5-gOWD+IFR-AK{AZ-SC 16750 2390.D0 14980.00 CD5-99Awpzl.1(Plan: CD5-99A) MWD+IFR-AK-CAZ-SC 17650 14980.00 15330.00 CD5-9 gAL1wp21.1(Plan: CD5-99AL1) INC+TREND 90 15330.00 16830.00 CD5-ggALlwpzl.l(Plan: CD5-99AL1) MWD 19000 15330.00 27146.95 CD5-99AL1wp21.1 (Plan: CD5-99AL1) MWD+IFR-AK-CAZ-SC 19900 0/360 20810 21720 21720 90 22630 23540 23540 24450 24450 0 25350 2626o 2626o -120/240 -150 / 216 mog, September 27 2016 V V 6o r -18o/18o 02 120 14980 15005 15005 _ 15190 15190 15380 15380 1556o 1556o 15750 15750 15930 15930 16120 16120 16300 16300 16750 16750 17200 17200 17650 17650 18100 181o0 __ ___ 18550 90 18550 19000 19000 19450 19450 19900 19900 20810 20810 21720 21720 22630 22630 23540 23540 24450 24450 25350 25350 2626o 2626o 27172 Casing Details Survey Program CD5 99ALiWP2l 1 TVD MD Name Depth From Depth To 746742 714 47a. 5/8 x97/8 -3/ moon 00.00 7576.01 z7t47 47 4-Uz" x 6-3/4° Survey/Plan Tool CDS 995rvyt SLB -GC-SS p 14900 15005 572.6 z2 0. t 9 7 5 z36o.53 239o.00 CD 5-995rvyt-SLB MWD GMAC (Rig: CDS-gly�WD+IFR-AK-CAZ-SC CD5-99 Srvy 3 -SLB SI -9")D IFR-AK-CAZ-SC 1/ O O o. o O TO 20000.00 V„ 0 0 0 0.0 0 239o.o0 14980.0o 1498 o.0o 1683. co 1533 o.0o 1714690 CD5-99Awp2t.t(Plan: CD5-99A) MWD+IFR-AK{AZ-SC CD5-99ALtwp21.1 (Plan: CD5-99ALt) INC+TREND CD5-99ALtwp21.1 (Plan: CD5-99ALt) MWD 1505 - 15190 15330.00 27146 95 CDS -99AL-P21.1(Plan:CD5-99ALt) MWD+IFR-AK-CAZ-SC 15190 1538o MD Azi 0/360 1538o 1556o 14980.00 121.00 14992.8o 119.97 -30/33 Q �_ - - Q 15560 15750 15022.8o 119.97 15750 15930 15072.64 118.72 ; 15930 16120 15112.80 11].]1 6 0 16120 16300 15370.07 11].]1 1 15464.37 119.]1 -60 300 �\ , ;,, q x 4. 60 16300 16750 16214.37 142.23 \ 16750 17200 16304.37 142.23 �v �\ 17200 17650 16629.82 151.64 27147.47 151.64 \�`fi µ ;: - 1765o 181oo -C Q/270 - F 18100 18550 _- 9Q 18550 19000 19000 19450 u f y O 19450 ----19900 19900 20810 -1201 24 Q 4, I 120 20810 21720 6o 21720 22630 22630 23540 -150/210 150 23540 24450 24450 25350 -18o/18o 25350 2626o 11:10, September 27 2o16 26260 27172 MD Casing Details 14980.00 Survey Program TVD MD Name 7467.42 14981 00 7-5/8"x 9-7/8" by 1," Depth From Depth To Survey/Plan Tool C D l.� wp z 7576.0, 27147.47 4-,/2" x 6-3/4" ,00.00 5oo.00 CDs -99 Srvy, SLB _GYD-GC-SS (Rig: CD5 99) GYD-GC-SS 5 g gA 117.71 572.96 2270.51 CD5-99 Sry SLIB_MWD GMAC (Rig: CD WD+IFR-AK-CAZ-SC Y2- ( g� 5-99) -60 / 15464.37 2360.53 239o.00 CD5-99 Srvy 3-SLB_MWD+CMAG(Rig: CD5-90WD+IFR-AK-CAZ-SC 142.23 390.00 14980 00 CD5,,Alw ,(Plan: CDS5999 MWD +IER-AK CAZ SC R 18000.00 To 2�000�00 151.64 ,4980.00 g330.Do ,5330.00 ,6830 .00 CDS-99AL,wp2,., (Plan: CDS-99AL,) INC+TREND CD5-99AL,wp2,., (Plan: CD 5-99AL,) MWD �533o.0o 27146.95 CD5-99AL,wp2,.1(Plan: CD5-99AL,) MWD+IFR-AK-CAZ-SC MD Azi 14980.00 121.00 14992.80 119.97 15022.80 119.97 15072.64 118.72 15112.80 117.71 15370.07 117.71 -60 / 15464.37 119.71 16214.37 142.23 16304.37 142.23 16629.82 151.64 27147.47 151.64 0/270 -120 / 0/360 -18o/18o 11:11, September 27 2016 1498o 15005 15190 - 1538o - 1556o - 15750 15930 16120 16300- 16750 17200 1765o - 18100 18550 - 19000 19450 19900 - 20810- 15005 15190 1538o 1556o 15750 15930 16120 _ 16300 16750 17200 17650 18100 _ 18550 19000 19450 __-19900 20810 21720 22630- 23540 24450 25350 26260 - 21720 22630 23540 24450 25350 2626o 27172 Casing Details Survey Program C D 5 9 9A Ll w 2 � 1 TVD MD Name 7467.42 4981.00 5/8" x 1/2" 6 y 4" 7576.01 27147-47 4-1Iz" x 6-3/4° Depth From Depth To 00 00 00.00 Survey/Plan Tool CDS 99 Srvy 1 SLB _GYD CC SS (Rig: CD5-qq) GVD GC SS 1498o 15005 p S72.96 2270.51 2360.53 2390.00 CD5-99 Sr" z -SLB MWD GMAG (Rig: CD5-99MWD+IFR-AK-CAZ-SC CD5-99Srvy3-SLB MWD+GMAG(Rig:CD5-9MWD+IFR-AK-CAZ-SC 2+000.00 To 277+.00 L 27172.00 2390.00 14980.00 4980.00 5330.00 15330.00 16830.00 CD5-99Awp2t1(Plan: CD5-99A) MWD +IFR-AK-CAZ-SC CDS99AL1wpz1.1(PIan:CD599AL1) NC+TREND CD599AL1wpztl(PIan: CD5-99ALt) MWD 15005 15190 15330.00 27146.95 CD5-99ALtwp21.1(Plan: CD5-99AL1) MWD+IFR-AK-CAZ-SC 15190 15380 MD Azi 0/360 1538o 1556o 14980.00 121.00 14992.80 119.97 -30/33 g 0 0 1556o 15750 15022.80 119.97 15750 15930 15072.64 118.72 15930 16120 15112.80 117-71 6o 16120 1630C 15370.07 11].]1 15464.37 119.71 6o/300 60 16300 16750 16214.37 142.23 16750 17200 16304.37 142.23 16629.82 151.64 0 17200 17650 27147.47 151.64 17650 181oo -c 01270 181oo 18550 go 18550 19000 19000 19450 0 19450 - 19900 19900 20810 -120/240 120 20810 21720 6o 21720 _ 22630 22630 23540 -150/210 150 23540 24450 go 24450 25350 -18o/180 25350 2626o 11:12, September 27 2016 26260 27172 Casing Details Survey Program C D 5 9 9 A �I wp 2 1 TVD MD Name 7467.4z 24987.47 S" x 9-7/8" 372" 7576.02 27147-47 x 9-7/ x 6-314° Depth From Depth To 274.96 500.01 Survey/Plan Tool CD5-99 Sry 2 SLB GC SS RI CD y ( g 5-99) GYD-CC-SS 14980 15005 • 57z.96 2270 51 z36o.53 z39o.00 CD5-99-SLB MWD GMAG(Rig: CD5-9t3�WDH FR AK-CAZ-SC CD5-995rvy3-SLB_MWD+GMAG(Rig: CD5-9MWD+IFR:AK-CAZ-SC 1 q' R T 1 0.O O O 0 O O.O O z39o.o0 2498-D 433o oo 15334 0o t533o.0o 76830.05 CD5-99Awpz2.I(PIan:CD5-9qA) MWD+IFR-AK-CAZ-SC CD5 99AL2wpz2.2 (Plan: CD5-99AL2) INC+TREND CD5-99AL7wpn.2(Plan: CDS-99AL7) MWD 15005 15190 V ■ 75330.00 z77g6.95 CD5-99AL7wp27.2 (PIan:CDS-99AL7) MWD+IFR-AK-CAZ-SC 15190 15380 MD Azi 0/360 Minor Risked 15380 1556o 14980.00 121.00 14992.8o 119.97 -30/33 9 0 0 1556o 15750 15022.80 119.97 15750 15930 15072.64 118.72 15930 16120 15112.80 117.71 6o 16120 16300 15370.07 117.71 15464.37 119.71 6o/300 6o 16300 16750 16214.37 142.23 16750 17200 16304.37 142.23 30 17200 17650 16629.82 151.64 27147.47 151.64 17650 18100 18100 18550 18550 19000 19000 19450 30 19450 -_ 19900 19900 20810 CD5-99Awp2l.l 120 20810 21720 6o 21720 22630 22630 23540 -150/210 150 23540 24450 go 24450 25350 -18o/18o 25350 2626o 13:21, September 27 2016 26260 27172 Casing Details Survey Program CD5 99A1.1wpz1 1 TVD MD Name 7467.42 714747 8„x9-7"8" -3/4" 7576.42 27247 47 4-1/2"x6-314° Depth From Depth To 0000 500.00 Survey/Plan Tool CD5-99-SLBGVD-GC-SS(Rig:CD5-99)GVD-GC-SS 149 o 15005 • 572.96 2270.51 2360.53 2390.00 CD5-99 Srvy 2-SLB_MWD GMAG(Rig: CD5-9P}jWD+IFR-AK-CAZ-SC - CD5-99 Sly 3 -SLB MWD+GMAG(Rig; CD5-9l)AWD+IFR-AK-CAZ-SC 16000.00 T027172.00 2390.00 1498-.00 24980 00 15330.00 15330.04 26630.00 CD5-99Awpzl.1(Plan: CD5-99A) MWD+IFR AK{AZ-SC CD5-99AL1wp21.2 (Plan CD5 99AL2) INC+TREND CDS-99AL1wpzt.l (Plan: CD5-99AL1) MWD -- 15005 ' 15190 25330.00 27146.95 CD5-99ALtwp21.2 (Plan: CDS-99AL1) MWD+IFR-AK-CAZ-SC 15190 15380 MD Azi 0/360 3 Minor Risked 15380 15560 14980.00 121.00 14992.80 119.97 -30/33 go 0 15560 15750 15022.80 119.97 15750 15930 15072.64 118.72 15930 16120 15112.80 117.71 6o 16120 16300 15370.07 117.71 15464.37 119.71 6o/300 6o 16300 16750 16214.37 142.23 16750 17200 16304.37 142.23 16629.82 151.64 30 17200 17650 27147.47 151.64 17650 181oo - 0/270 18100 __ . ---___- 18550 go 18550 19000 19000 ___. __ __ __ 19450 30 19450 ----19900 19900 20810 -120/240 120 20810 21720 6o 21720 22630 22630 23540 -150/210 150 23540 24450 go 24450 25350 -18o/18o 25350 2626o F-13:24, September 27 2016 2626o 27172 ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD5 Alpine West Pad Rig: CD5-99 50-103-20748-00-00 Plan: CD5-99AL1 Plan: CD5-99AL1wp21.1 Error Ellipse Survey Report 27 September, 2016 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99AL1 Design: CD5-99AL1wp21.1 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature 1.00 sigma EDM Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1983 System Datum: Mean Sea Level Geo Datum: North American Datum 1983 Using Well Reference Point Map Zone: Alaska Zone 4 Using geodetic scale factor Site CD5 Alpine West Pad Site Position: Northing: 5,965,528.00 usft Latitude: 70° 18'47-778 N From: Map Easting: 1,489,252.00 usft Longitude: 151° 13'30.647 W Position Uncertainty: 0.00 usft Slot Radius: 13-3/16 " Grid Convergence: -1.15 ' Well Rig: CD5-99 Well Position +N/ -S 0.00 usft Northing: 5,965,666.90 usft Latitude: 70' 18'49.211 N +E/ -W 0.00 usft Easting: 1,489,591.67 usft Longitude: 151° 13'20.821 W Position Uncertainty 0.00 usft Wellhead Elevation: Ground Level: 33.90 usft Wellbore Plan. CD5-99AL1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2016 8/25/2016 17.58 80.82 57,511 Design CD5-99AL1wp21.1 - --- - Audit Notes: Version: Phase: PLAN Tie On Depth: 14,980.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 36.55 0.00 0.00 152.00 Survey Tool Program Date 9/27/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 500.00 CD5-99 Srvy 1 - SLB _GYD-GC-SS (Rig: C GYD-GC-SS Gyrodata gyro single shots 572.96 2,270.51 CD5-99 Srvy 2 - SLB_MWD_GMAG (Rig: MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,360.53 2,390.00 CD5-99 Srvy 3 - SLB_MWD+GMAG (Rig: MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 2,390.00 14,980.00 CD5-99Awp21.1 (Plan: CD5-99A) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 14,980.00 15,330.00 CD5-99AL1wp21.1 (Plan: CD5-99AL1) INC+TREND Inclinometer+ known azi trend 15,330.00 16,830.00 CD5-99AL1wp21.1(Plan:CD5-99AL1) MWD MWD - Standard 15,330.00 27,146.95 CD5-99AL1wp21.1 (Plan: CD5-99AL1) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Position uncertainty and bias at survey station Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semi -major Serm-mor Depth Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool (usft) (°) (°) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 14,980.00 80.00 121.00 7,467.25 20.79 -4.02 75.29 -0.40 19.62 6.40 14.65 75.30 9.74 120.17 MWD+1FR-AK-CAZ-SC (1, 4) 14,980.40 80.06 120.97 7,467.32 20.79 -4.02 75.29 -0.40 19.62 6.40 14.65 75.30 9.74 120.17 INC+TREND (1, 5) 14,981.00 80.14 120.92 7,467.42 20.66 -4.45 75.38 -0.17 19.60 6.40 14.66 75.38 9.89 120.17 INC+TREND (1, 5) 14,992.80 81.76 119.97 7,469.28 20.66 -4.45 75.38 -0.17 19.60 6.40 14.66 75.38 9.89 120.17 INC+TREND (1, 5) 9/27/2016 11:13:13AM Page 2 COMPASS 5000.1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig: CD5-99 Wellbore: Plan: CD5-99AL1 Design: CD5-99AL1wp21.1 Position uncertainty and bias at survey station ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference Survey Calculation Method: Output errors are at Database: Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature 1.00 sigma EDM Production Measured Inclination Azimuth Vertical Highside Lateral Vertical Magnitude Semn-major Semi -minor Depth Dip Dir. TVD +N/ -S Depth Error Bias Error Bias Error Bias of Bias Error Error Azimuth Tool CD5-99AL1 02.Heel 092 0.00 (usft) (°) (°) (usft) (usft) tom) (usft) (usft) (usft) (usft) (usft) (usft) (usft) (°) 14,993.20 81.72 119.97 7,469.33 20.66 -4.45 75.38 -0.17 19.60 6.40 14.66 75.38 9.89 120.17 INC -TREND (1, 5) 14,997.18 81.33 119.97 7,469.92 20.73 -4.27 75.52 -0.17 19.60 6.41 14.67 75.52 9.89 120.17 INC+TREND (1, 5) 14,999.22 81.12 119.97 7,470.23 20.73 -4.27 75.52 -0.17 19.60 6.41 14.67 75.52 9.89 120.17 INC+TREND (1, 5) 15,022.80 78.76 119.97 7,474.35 20.98 -3.71 76.65 -0.17 19.64 6.41 14.70 76.65 9.90 120.16 INC+TREND (1, 5) 15,023.20 78.77 119.96 7,474.43 20.98 -3.71 76.65 -0.17 19.64 6.41 14.70 76.65 9.90 120A6 INC+TREND (1, 5) 15,072.64 80.00 118.72 7,483.53 20.94 -4.02 82.37 0.12 19.67 6.42 14.77 82.40 9.91 120.07 INC+TREND (1, 5) 15,073.04 80.01 118.71 7,483.60 20.94 -4.02 82.37 0.12 19.67 6.42 14.77 82.40 9.91 120.07 INC+TREND (1, 5) 15,112.80 81.00 117.71 7,490.16 20.96 -4.26 89.77 0.36 19.76 6.43 14.82 89.84 9.94 119.87 INC+TREND (1, 5) 15,113.20 81.01 117.71 7,490.22 20.96 4.26 89.77 0.36 19.76 6.43 14.82 89.84 9.94 119.87 INC+TREND (1, 5) 15,370.07 90.00 117.71 7,510.34 26.29 .6.46 156.27 0.56 26.29 6.46 15.10 156.29 10.27 118.67 MWD (1, 6) 15,370.47 90.01 117.72 7,510.34 26.29 -6.46 156.27 0.56 26.29 6.46 15.10 156.29 10.27 118.67 MWD (1, 6) 15,464.37 92.00 119.71 7,508.69 26.02 -6.93 156.55 0.61 26.29 6.45 15.20 156.58 10.28 118.68 MWD (1, 6) 15,464.77 92.00 119.73 7,508.68 26.02 -66.93 156.55 0.61 26.29 6.45 15.20 156.58 10.28 118.68 MWD (1, 6) 16,214.37 92.04 142.23 7,481.92 26.42 -6.94 146.41 -1.01 26.49 6.43 15.80 159.32 10.78 118.94 MWD (1, 6) 16,214.77 92.04 142.23 7,481.90 26.42 .6.94 146.41 .1.01 26.49 6.43 15.80 159.32 10.78 118.94 MWD (1, 6) 16,304.37 92.04 142.23 7,478.71 26.46 -6.94 146.81 -0.58 26.53 6.43 15.85 159.68 10.96 119.01 MWD (1, 6) 16,304.77 92.04 142.24 7,478.70 26.46 -6.94 146.81 -0.58 26.53 6.43 15.85 159.68 10.96 119.01 MVVD (1, 6) 16,629.82 89.45 151.64 7,474.49 26.75 -6.28 136.19 -1.53 26.71 6.42 16.05 161.01 11.96 119.31 MWD (1, 6) 16,630.23 89.45 151.64 7,474.49 26.75 -628 136.19 -1.53 26.71 6.42 16.05 161.01 11.96 119.31 MWD (1, 6) 16,630.26 89.45 151.64 7,474.49 26.75 -6.28 136.19 -1.53 26.71 6.42 16.05 161.01 11.96 119.31 MWD (1, 6) 24,395.97 89.45 151.64 7,549.45 30.93 -6.30 147.67 -7.65 30.90 6.50 22.94 168.73 26.68 122.31 MVD+IFR-AK-CAZ-SC (2,6) 27,147.47 89.45 151.64 7,576.01 33.75 -6.30 155.77 -7.65 33.73 6.26 10.62 174.81 32.44 124.14 BLIND (2,6) Design Targets Target Name hittmiss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude CD5-99AL1 02.Heel 092 0.00 0.00 7,474.56 -7,071.99 11,646.65 5,958,362.92 1.501,093.06 70' 17' 39.567 N 151' T41.364 W plan misses target center by 0.22usft at 16630.23usft MD (7474.49 TVD, -7072.09 N, 11646.46 E) Circle (radius 100.00) CD5-991_1 03. Toe 0721, 0.00 0.00 7,576.01 -16,326.93 16,641.48 5,949,010.21 1,505,900.61 70' 16'8.449 N 151° 5' 16.381 W plan hits target center - Circle (radius 100.00) CD5-99AL1 Polygon 09: 0.00 0.00 7,576.01 -6,011.81 10,428.32 5,959,447.28 1,499,896.36 70° 17'50.011 N 151' 8'16.831 W plan misses target center by 107.37usft at 14996.45usft MD (7469.81 TVD, -6019.80 N, 10441.98 E) Polygon Point 1 7,576.01 0.00 0.00 5,959,447.28 1,499,896.36 Point 2 7,576.01 -248.58 408.92 5,959,190.56 1,500,300.18 Point 3 7,576.01 -768.47 931.66 5,958,660.31 1,500,812.33 Point 7,576.01 -1,112.69 1,133.21 5,958,312.14 1,501,006.91 Point 5 7,576.01 -1,371.80 1,272.86 5,958,050.29 1,501,141.32 Point 7,576.01 -10,362.62 6,125.15 5,948,964.49 1,505,811.67 Point 7,576.01 -10,267.61 6,301.17 5,949,055.94 1,505,989.55 Point 8 7,576.01 -1,276.80 1,448.88 5,958,141.73 1,501,319.20 Point 9 7,576.01 -1,033.92 1,260.88 5,958,388.32 1,501,136.13 Point 10 7,576.01 -647.57 1,058.21 5,958,778.64 1,500,941.27 Point 11 7,576.01 -147.47 482.42 5,959,290.16 1,500,375.69 Point 12 7,576.01 44.02 23.73 5,959,490.81 1,499,920.97 9/27/2016 11:13:13AM Page 3 COMPASS 5000.1 Build 74 Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Rig CD5-99 Wellbore: Plan. CD5-99AL1 Design: CD5-99AL1wp21.1 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Rig: CD5-99 CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) CD5-99: 33.9+36.55 @ 70.45usft (Coyon 19) True Minimum Curvature 1.00 sigma EDM Production Casing Points Vertical Dip Depth Depth Measured Vertical Casing Hole Name Depth Depth Diameter Diameter 0.00 (usft) (usft) Name (") (") 14,415.67 2,337.14 2,181.69 10-3/4" x 13-1/2" 10-3/4 13-1/2 7,466.10 14,981.00 7,467.42 7-5/8" x 9-7/8" by 11" 7-5/8 11 UJU 27,147.47 7,576.01 4-1/2" x 6-3/4" 4-1/2 6-3/4 Formations Measured Vertical Dip Depth Depth Vertical Dip Direction (usft) (usft) Name Lithology 13,692.38 7,018.73 HRZ 0.00 14,118.30 7,193.96 Kalubik 0.00 14,415.67 7,316.30 LCU 0.00 14,973.39 7,466.10 AlpC 0.00 14,997.18 7,469.92 UJU 0.00 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +EI -W (usft) I (usft) (usft) (usft) Comment 14,980.40 7,467.32 -6,011.79 10,428.30 Start DLS 15.90 TFO -30.00 1 14,993.20 7,469.33 -6,018.20 10,439.20 Start DLS 10.00 TFO -180.00 15,023.20 7,474.43 -6,032.97 10,464.81 Start OLS 3.50 TFO -45.00 15,073.04 7,483.60 -6,056.96 10,507.51 Start OLS 3.50 TFO -45.00 15,113.20 7,490.22 -6,075.69 10,542.42 Start Build 3.50 15,370.47 7,510.34 -6,194.84 10,769.25 Start DLS 3.00 TFO 45.00 15,464.77 7,508.68 -6,240.15 10,851.92 Start DLS 3.00 TFO 89.50 16,214.77 7,481.90 -6,728.56 11,414.10 Start 90.00 hold at 16214.77 MD 16,304.77 7,478.70 -6,799.65 11,469.19 Start DLS 3.00 TFO 105.30 16,630.26 7,474.49 -7,072.12 11,646.48 Start 10517.28 hold at 16630.26 MD 27,147.47 7,576.01 -16,326.93 16,641.48 TD at 27147.53 Checked By: Approved By: Date: 9/27/2016 11:13:13AM Page 4 COMPASS 5000.1 Build 74 14:08, September 27 2016 C D 5 -9 9 A L 1 wp 21 1 WELLBORE Name 03. r 072116 JD TARGET DETAILS TVDoe 7576 C)l (MAP CO-ORDINATES) Shape Quarter Mile View CD5-99AL102.Heel 092216 BP_Cidce7576.01 CD5-99AL1 02.Heel 092216 BP 7474.56 CD5-99AL1 092216 BP_Circle 7474.56 Circle (Radircle ius: 1320.00) Circle (Radius: 100.00) Circle (Radius: 132ygon Polygon CD5-99AL1 Polygon 092116 BP 7576.01 Polygon Oma' c°yCos-rjlk 0 C -3500 GoyoS � °yo O CO � g9 + 7000 O CD4-318A z :210500- 0500 0 O a w N 14000 -14000- -17500 -17500 Oy99 -3500 0 3500 7000 10500 14000 17500 21000 24500 WELLBORE TARGET DETAILS (MAP CO-ORDINATES) 14:09, September 27 2016 C D 5 -9 9 A L 1 w p 21■ 1 Name TVD Shape CD5-991-1 03. Toe 072116 JD 7576.01 Circle (Radius: 100.00) CD5-99AL1 02. Heel 092216 BP_Cidce7576.01 Circle (Radius: 1320.00) Quarter Mile View CD5-99AL1 02.Heel 092216 BP 7474.56 Circle (Radius 100.00) CD5-99AL1 02.Heel 092216 BP_CircIe 7474.56 Circle (Radius: 132o CD5-99AL1 Polygon 092116 BP 7576.01 Polygon Goy' 05 0 Gly, -5000- 7500- 0 5000 7500 o -_ O Gp4-318A L(7 0000- +0, 3Q s✓ O Z 2500 C) O a U) N 1 -15000 Cp5-313 -17500 5000 7500 10000 12500 15000 17500 20000 22500 25000 I CD5-99AL1wt)21.1 Surface Location I CPA", Coordinate Converter El From: Datum:Region: ala --a--7- pz�� Fsk r Latitude/Longitude IDecimal Degrees C- UTM Zone: F_ F South 0- State Plane Zone: 4 Units: jus -ft I Legal Description (NAD27 only) — ---------- ------- _j Starting Coordinates: ---- X: 11489591.67 Y: 15965666.90 To: Datum:IRegion: NAD27 [alaska Latitude/Longitude DecimalDegrees UTM Zone: f—True F South State Plane Zone: —F Units: us -ft ;I �-] j - Legal Description (NAD27 only) Ending Coordinates: - X: 349558.527980958 Y: 5965920.93081628 ........... Transform Quit : ...................................... * .................................. ; I Help I CD5-99AL1wp21.1 Kick-off point I M CPA] Coordinate Converter From: Datum: INAD83 Region: alaska Latitude/Longitude IDecimal Degrees r UTM Zone: I f- South ro State Plane Zone: F 4 Units: lus-ft W1 r Legal Description (NAD27 only) Starting Coordinates: X: 1-4-99-89601 Y: 1695944761 To: Datum: NZ27 ;I Region: jalaska Latitude/Longitude I Decimal Degrees f- UTM Zone: FT—rue F South (-9 State Plane Zone: 14 Units: I us -ft r Legal Description (NAD27 only) F Ending Coordinates: X: 3598E.740933013 Y: 5E9701.1 666542 Transform Quit ...................................................... ..........*................... %: ..................... I CD5-99AL1wp21.1 Production Horizon I M CPAI Coordinate Converter From: Datum: NApg3 + Region:alaska LatitudelLongitude Decimal Degrees + UTM Zone: �— F South t: State Plane Zone: + Units: us -ft + -" Legal Description (NAD27 only) Starting Coordinates:------� X: 1149590.56 Y: 5959450.97 CD5-99AL1wp21.1 TD CPA] Coordinate Converter rom:._"_.-____-_----.� Datum: NAD83 + Region: ala-,-k-,- Latitude/Longitude [Decimal Degrees t " UTM Zone: f— I- South To: - Datum: INAD27 + Region: lalaska + C' Latitude/Longitude Decimal Degrees r' UTM Zone: True F South C-- State Plane Zone: 14 _ Units: us -ft + (- Legal Description (NAD27 only) Ending Coordinates:— -- X: 359857.231 j1 4821 Y: 5959704.63006003 .........................................................., Transform Quit Help State Plane Zone: 4 + Units: us -ft + (- Legal Description (NAD27 only) Datum: JNAD27 + Region: alaska + Latitude/ Longitude Decimal Degrees + I- UTM Zone: True i South State Plane Zone: 4 + Units: us -ft ` Legal Description (NAD27 only) Starting Coordinates: ---- - - - - -Ending Coordinates:_._ --- X: I 1505900.61 X: 365866.847268248 Y: 15649010.21 Y: 5949263.52045581 Transform. Quit Help CD5-99AL1wp21.1 Surface Location . CPAI •Coordinate C-ornrerter o CI From: --- --- – — - – T o: Datum: Nt,pg3 Region: alaska Datum: INAD27 Region: alaska �-------� r Latitude/Longitude Decimal Degrees i Latitude/Longitude Decimal Degrees t� UTM Zone: F South r UTM Zone: True F South Stake Plane Zone: 4 Units: us-fk + State Plane Zone: 14 Units: us-ft :;_rip(i_,r (Pi,aD=r" ru_ to- Legal Description (NAD27 only) Starting Coordinates: - --- Legal Description X: 1489591.67 Township: fol1 FN---1 Range: 004 Y 5965666.90 Meridian: lu j Section:' l8 FNL 287.03168 FEL T 2420.8262 .................Transform.................; Quit Help CD5-99AL1wp21.1 Kick-off point EZ, CPA[ Coordinate Converter Q From: _—___ __ _.._.__�-- To: -- Datum: INAD83 –1 Region: alaska D, Datum: NAD27 Region:alaska Latitude/Longitude Decimal Degrees Latitude/Longitude IDecimal Degrees UTM Zone: r.� r South 14 r UTM Zone: True F South Skate Plane Zone: � Uniks: us ft A-t" State Plane Zone: 4 �, Units: us-ft T <" Legal C?escriptio (NAD27 only) t'* Legal Description (NAD27 only) Starting Coordinates: --- X: 11499896.01 I Legal Description -- --- Township: 011 N w Range: 004 E w Y: (5959447.51 Meridian: JU Section: 21 i FNL (1026.7786 FEL 2576.3850 .......................................................... Quit Transform Help CD5-99ALIwp2I.1 Production Horizon CPAJI Coordinate Con-verter From: Datum: INAD83 Region: a_Iaska______-_] F Latitude/Longitude Decimal Degrees UTM Zone: f— F South r- State Plane Zone: V--:] Units: us -ft Legal De:::cripdon (NAD or -,(y) Starting Coordinates: X: 1499896.50 Y: 15959450.97 CD5-99AL1wp2I.1 TD CPAI Coordinate Converter From: Datum: INAD63 Region: Fla'sk, r LatitudOLongitude rDecima[Degrees (- UTM Zone: South r- State Plane Zone: 14 Units: [u`s­f_t,j -Starting Coordinates: X: 1505900.61 Y: IE649010.21 To: -- ___ Datum: FN_AD­2_7,_j Region: Fa-ja­,-k-,-----,-j --- j Latitude?Longitude DecimalDegrees C- UTM Zone: rTrue F South State Plane Zone: 14 Units: :-:] 6- Legal Description (NAD27 only) Legal Description Township: [01-1 J -N--,-] Range: j_004 rE---,-1 Meridian: JU Section:121 FFNC 1 (1 023.4229 FEL 1 2581.9 C57 ransform......, Quik Help E. To:-__ Datum: jNAD27 Region: I alaska I Latitude/Longitude Decimal Degrees UTM Zone: True F South r State Plane Zone:R Units: us I I —f F - --.I ro Legal Description (NAD27 only) Legal Description Township: 0-11 [-N --,-1 Range: 004 FE 71 Meridian: IU Section:134 JFNL 794.06342 FEL _ 1683.5266 Quit,.. uit Transform Help . .................................. ..................... Tollerable Collision Risk Worksheet REVI DATE IBYICKIAPPI DESCRIPTTON REV 7 DATE I BY CK APP DESCRIPTION 1 4/24/15 1 CZ DB C.A. I UPDATED PER K150003ACS 1 2 5/2/16 CZ GD C. A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT J LOCATION OF THIS SURVEY T12 PAD ^, T11 N CD4 TO ALPINE CD5' CD ,r ACCESS ROAD 1 A CID n yn �O LL ITE�1. CD1 - P,1 VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR 0 EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. p p,0 CD -5 PAD S\-\ DE SIGN oo�� • • ow • • �cooa��j� x�Noo:�!•��Gp5,x�4 � \ x x NN �6• • _ _ PLANT N C) NOTE: 15.4052" a (- CONDUCTOR CD5-x14 WAS PLUGGED AND ° o ABANDONED LCMF APRIL 2016. r\��a KUUKPIK Z UMIAQ ALPINE SURVEY OFFICE PHONE : 907-670-4739 ,,•� ALPINE MODULE: CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS—BUILT LOCATIONS CADD FILE NO. DRAWING N0: PART: REV: 15-03-02-1 04/18/2015 1 CE—CD50-1025 1 1 of 3 2 REVI DATE IBYICK JAPPI DESCRIPTION IREVI DATE I BY I CK APP DESCRIPTION 1 4/24/15 1 CZ 1 DB I C. A. 1 UPDATED PER K150003ACS 1 2 5/2/16 CZ I GD I C. A. 1 UPDATED PER K160003ACS ALL CONDUCTORS WELL Y' ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, SEC.LINE 0/S X' LAT.(N) LONG.(W) FNL FWL R 4 GND E, U. M. EXIST. PAD CD5-x99 5,965,666.90 1 489 591.67 70' 18 49.211 151' 13 20.820 287 2508 27.5 33.9 CD5-x01 51965,661.64 1 489 572.44 70' 18 49.155 151' 13 21.378 293 2489 27.6 34.1 CD5-x02 5,965,656.28 1,489,553.29 70' 18 49.099 151' 13 21.934 299 2470 28.1 34.1 CD5-x03 5,965,650.92 1489534.00 70' 18 49.042 151 13 22.493 305 2451 28.4 34.1 CD5-x04 5,965,645.24 1489,514.77 70' 18 48.982 151 13 23.051 311 2432 26.6 34.2 CD5-x05 5,965,639.80 1489495.46 70' 18 48.925 151' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1,489,476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151' 13 24.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1,489,437.69 70' 18 48.757 151' 13 25.287 334 2355 28.1 34.3 CD5-x09 5,965,618.27 1 489 418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 5,965 613.12 1,489,399.13 70' 18 48.644 151' 13 26.405 345 2317 28.1 34.1 CD5-x11 5,965,607.66 1,489,379.86 70' 18 48.586 151' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,965,602.23 1 489360.56 70' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965,596.59 1,489,341.43 70' 18 48.470 151' 13 28.079 363 2259 26.1 34.2 eD5- -x1 ' 48.�..32i:33 '^� .� BI . ;1; 151' 1 z3' 28-633-- 36-8!- z''� 27.6 34-2 CD5-14X 5,965,589.94 1 489,317.35 70 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1 489 303.11 70' 18 48.359 151' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1,489 283.58 70' 18 48.300 151' 13 29.757 380 2202 27.6 34.0 CD5-x17 5,965,575.11 1 489 264.31 70' 18 48.243 151' 13 30.316 386 2183 27.7 34.0 CD5-x18 5,965 569.79 1,489,245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1 489225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965,558.96 1489206.70 70' 18 48.073 151' 13 31.987 403 2125 25.8 33.8 CD5-x21 5,965,553.51 1,489187.22 70' 18 48.016 151' 13 32.552 409 2106 27.8 33.8 CD5-x22 5,965,548.14 1 489168.15 70' 18 47.959 151' 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965,542.72 1,4 9,148.81 70' 18 47.902 151' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965,537.42 1489129.64 70' 18 47.846 151' 13 34.222 426 2049 28.0 33.7 CD5-x25 5,965,532.01 1,489110.28 70' 18 47.789 151' 13 34.793 -4 -32 -TO -2-9 27.7 33.7 CD5-x26 5,965,526.59 1 489 091.09 70' 18-4 7. 73 2 151' 13 35.340"-438 2010 --f6-.,3-,33.7 CD5-x27 5,965,521.20 1,489 071.88 70' 18 47.675 151' 13 35.897 444 1991 27.5 33.7 CD5-x28 5,965,515.81 1 489052.48 70' 18 47.618 151' 13 36.460 449 1972 27.4 33.6 CD5-x29 5,965,510.40 1,489 033.34 70' 18 47.561 151' 13 37.015 455 1953 27.6 33.6 CD5-x30 5,965,504.97 1,489,014.02 70' 18 47.504 151' 13 37.575 461 1934 25.3 33.6 CD5-x31 5,965,499.57 1 489994.73 76-f-1 8 47.447 151' 13 38.135 467 1915--26.6 33.6 CD5-x32 5,965,494.13 1,488,975. 5 70' 18 47.390 151' 13 38.694 473 1895 26.8 33.6 CD5-x33 1 5,965,488.75 1 488956.35 70' 18 47.333 151' 13 39.248 478 1876 27.0 33.6 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL (B.P.M.S.L.) 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. KUUKPIK U M I A Q ALPINE SURVEY OFFICE PHONE : 907-670-4739 y� ConocoPhillips Alaska, Inc. ALPINE MODULE:CD50 ALPINE PROJECT CD -5 WELL CONDUCTORS AS -BUILT LOCATIONS UNIT: CD CADD FILE N0. 15-03-02-1 04/18/2015 DRAWING N0: CE-CD50-1025 PART: 1 of 3 REV: 2 TRANSMITTAL LETTER CHECKLIST WELL NAME: (f -R (, C &S' Yf 7A L PTD: d n - IaJ /Development _ Service Exploratory _ Stratigraphic Test Non -Conventional FIELD: Cl V I (f �-U&/ POOL: Ccs U►� �Ci �1' � �/ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The pis for a new wellbore segment of existing well Permit LATERAL No. (o — % �Z , API No. 50-103 - A'07-99 -01- 0 Q. (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 Well Name: COLVILLE RIV UNIT CD5-99AL1 Program DEV Well bore seg se PTD#: 2161240 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type DEV / PEND GeoArea HID --Unit 50360 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j.1_.A),(j.2.A-D) _ _ - - - - _ _NIA --- - - - - - - - - - - - - -- - - - - - -- 1 Permit fee attached- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - . . 2 Lease number appropriate- - - - - - - - - - - - - - - - - - - - - - . - - - - Yes - - - - - - - FEEOONPRA4, Surf; FEEOONPRA2, Top Prod-& TD, ADL 0387208, Portion Prod Interv, ADL 0387209, Portion Pr 3 roque well name andnumber Yes - - - - -CRU CD5-99AL1- ----------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 Well located in_adefined -pool _ - - - - - - - - Yes - COLVILLE_RIVER,_ALPINE_OIL - 120100, governed by Conservation Order No. 4436. 5 Well located proper distance from drilling unit_boundary- - - - - - - - - - - _ - - - Yes CO 4436 contains no spacing restrictions with_respect to drilling unit boundaries. 6 Well located proper distance from other wells_ Yes - CO 4438 has no interwell spacing restrictions. - - - - - - - - - 7 Sufficient acreage -available in -drilling unit- - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8 If_deviated,-is _wellbore plat -included - - ------------- - - - - - - - - - - - - - -- Yes- - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Operator only affected party - - Yes - Wellbore will be_ more than 500' from an external property line where- ownership or landownership - changes. -10 Operator has_appropriatebondinforce-------------------------------- Yes-- -------- ------------------- ---- ----- ------------------- ------- Appr Date 11 Permit_ can be issued without conservation order_ - - - _ - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - -- - - - - - - - - -- 12 Permit_can be issued without administrativ_e_approval ------ - -------- Yes _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ --- - ------ _ -------- _ _ _ _ _ _ _ _ _ --------------- _ _ _ _ _ PKB 9/29/2016 13 Canpermitbeapprovedbefore 15 -day wait- - - - - - - - -- - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- -- - - - - - 14 Well located within area and -strata authorized by Injection Order # (put_ 10# in -comments) -(For NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 All wells -within 1/4 mile area of review identified (For service well only) - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - _ _ I. - - - _ _ - - - .. 16 Pre -produced injector: duration of pre production Less. than 3 months_ (For -service well only) - NA. - - - - - - 18 Conductor string -provided - - ------------------_ - - - - - - _ - - - - ---- N_A-------- Con_ductor_provided in CRU_CD5-99 Engineering 19 Surface casing_ protects all -known USDWs - - - - - NA- - - - - - - _ Surface casing set-in CRU CD5-99 - - - - - - - - - - - - - - - - - - - - 20 CMT. vol -adequate _to circulate -on conductor _& sun`_csg - - - - - - - - _ - - - - - - - NA- - - - - - - - Surface casing set and fully cemented - - - - _ - - - - - - 21 CMT -vol adequate to tie-in long string to surf csg- - - N_A. - - - - - - - . - - _ - -- - - - - - - - - - - - - - - - CMT will cover all known -productive horizons_ No P- pups Pr_oductiv_e_interval willbecompleted with uncemented linerwith erf _u s - - - 23 Casing designs adequate for CJ, B &_ permafrost- - - - - - - - - - - - - - - - - - Yes . - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - _ - - - - - - - - _ - _ - - - - - - - - _ _ - - - _ _ - - - - - _ _ 24 Adequate tankage or reserve pit - - - Yes _ - Rig has steel tanks; all _waste _to approved disposal wells - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 25 If_a_re-drill, has- a 10-403 for abandonment been approved - - - - - NA_ - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - -- -- - - - - - 26 Adequate wellbore separation proposed Yes - - - - - Anti -collision analysis complete; CD4 -322 fails major risk & is -SI @ surface - - - - - - - - 2 7 -if - d i v e rte r required, does it _meet_ regulations _ -- - _ - - - - - . - - - _NA_ _ - - - - - - - - - - - - - - -- - -- - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 28 Drilling fluid_ program schematic & equip -list -adequate - - - - - - - - - - - - - - - Yes - - - - - - - Max formation_ pressure is -3714 psig(9.4 ppg EMW); will drill w/-9.5 ppg_E-MW VTL 10/3/2016 29 BOPEs,_dothey meet regulation - - - - - - - - - - - - - - - - - - -- - - - - Yes -- - - - -- - - - - _ - - - - - - - - - - - - 30 BOPE-press rating appropriate; test to -(put psig in comments)_ - - - - - - . Yes - - - - - - - MPSP s_2945 psig; will test BOPs_to 3500_p5ig - - - - - - _ . 31 Choke -manifold complies w/API_RP-53 (May 84)_ _ - Yes - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - 32 Work will occur without operation -shutdown ----------- -------- - - - - - - - --- Yes. - - - - -- - - - - -- - - -- - - - - - - - - - - - - - - - - - . _ - - .. . 33 Is presence of H2S gas_ probable - - - - - - - Yes 1-12S measures required - - - - - - - - - - - - I34 Mechanical -condition of wells within AOR verified (For service well only) - - NA_ - - - - - - . - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - -- - - - - - 35 Permit can be issued w/o hydrogen_ sulfide measures - - - . No - - - - 1-12S measures required. - --- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Geology 36 Data -presented on potential overpressure zones - - - - - . - - - Yes - - - Expected reservoir pressure is 9.45 ppg EMW; will be drilled using -9-.5 ppg-mud, Appr Date 37 Seismicanalysisof shallow gas -zones- - - - - - - - - - - - - - - . - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - PKB 9/29/2016 38 Seabed condition survey -(if off -shore) - - - NA_ - - - - - - - - -- -- - - - - - - - - - - - - - - -- - - - - - - - - - 39 Contact name/phone for weekly -progress reports_ [exploratory only] - - - - _ -NA_ - . _ _ _ _ Onshore development lateraltQ be drilled- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Geologic Engineering Public C Date: Date Date Commissioner: ommissio er: Commissioner t a -