Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout216-156DATA SUBMITTAL COMPLIANCE REPORT 3/13/2017 Permit to Drill 2161560 Well Name/No. KUPARUK RIV UNIT 1B-18AL3-01 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-63-00 MD 10900 TVD 6627 Completion Date 12/14/2016 Completion Status 1 -OIL REQUIRED INFORMATION Mud Log No Ix, Samples No v/ DATA INFORMATION Types Electric or Other Logs Run: GR/Res Well Log Information: Log/ Interval Electr Scale Media No — Data Digital Dataset Type Med/Frmt Number Name ED C 27867 Digital Data ED C 27867 Digital Data Log C 27867 Log Header Scans ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data ED C 27928 Digital Data AOGCC Current Status 1 -OIL UIC No Directional Survey Yes (data taken from Logs Portion of Master Well Data Maint) Log Log Run Interval OH / Scale Media No — Start Stop — CH Received 1/6/2017 1/6/2017 0 0 6920 10900 1/18/2017 1/18/2017 1/18/2017 1/18/2017 1/18/2017 IP 1/18/2017 1/18/2017 1/18/2017 1/18/2017 1/18/2017 1/18/2017 1/18/2017 1/18/2017 Page 1 of 3 Comments Electronic File: 1 B-18AL3-01 EOW - NAD27.pdf , Electronic File: 1 B-18AL3-01 EOW - NAD27.txt 2161560 KUPARUK RIV UNIT 1B-18AL3-01 LOG HEADERS Electronic Data Set, Filename: 1 B-18AL3-01 GAMMA RES.Ias Electronic File: 1 B-18AL3-01 2MD Final ' Logs.cgm Electronic File: 1 B-18AL3-01 51VID Final Logs.cgm Electronic File: 1 B-18AL3-01 5TVDSS Final Logs.cgm Electronic File: 1B-18AL3-01 2MD Final Logs.pdf Electronic File: 1B-18AL3-01 5MD Final Logs.pdf Electronic File: 1 B-18AL3-01 5TVDSS Final' Logs.pdf Electronic File: 1 B-18AL3-01 EOW - NAD27.pdf Electronic File: 1 B-18AL3-01 EOW - NAD27.txt Electronic File: 1 B-18AL3-01 Final Surveys TD 10900 Confirmed.csv Electronic File: 1 B-18AL3-01 Survey Listing.txt Electronic File: 1 B-18AL3-01 Surveys.txt Electronic File: 1 B-18AL3- 01 _25_tapescan_B H I_CTK.txt Monday, March 13, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/13/2017 Permit to Drill 2161560 Well Name/No. KUPARUK RIV UNIT 1B-18AL3-01 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-63-00 MD 10900 TVD 6627 Completion Date 12/14/2016 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 27928 Digital Data 1/18/2017 Electronic File: 1B-18AL3- 01 _5_tapesca n_B H I_CT K.txt ED C 27928 Digital Data 1/18/2017 Electronic File: 1B-18AL3-01_output.tap' ED C 27928 Digital Data 1/18/2017 Electronic File: 1B-18AL3-01 2MD Final Logs.tif ' ED C 27928 Digital Data 1/18/2017 Electronic File: 16-18AL3-01 5MD Final Logs.tif ED C 27928 Digital Data 1/18/2017 Electronic File: 1 B-18AL3-01 5TVDSS Final - Logs.tif Log C 27928 Log Header Scans 0 0 2161560 KUPARUK RIV UNIT 1B-18AL3-01 LOG HEADERS Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report Y Production Test Informatio Y NA Geologic Markers/Tops Y COMPLIANCE HISTORY Completion Date: 12/14/2016 Release Date: 11/18/2016 Description Comments: Interval Start Stop Directional / Inclination Data Mechanical Integrity Test Information Y NA Daily Operations Summary y Date Comments AOGCC Page 2 of 3 Sample Set Sent Received Number Comments Mud Logs, Image Files, Digital Data Y Core Chips Y Composite Logs, Image, Data Files (�) Core Photographs Y Cuttings Samples Y /NA Laboratory Analyses Y / Monday, March 13, 2017 DATA SUBMITTAL COMPLIANCE REPORT 3/13/2017 Permit to Drill 2161560 Well Name/No. KUPARUK RIV UNIT 1 B-18AL3-01 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-63-00 MD 10900 TVD 62 Com letion ate 1 14/2016 Completion Status 1-0IL Current Status I UIC No Compliance Reviewed By: _ Date: AOGCC Page 3 of 3 Monday, March 13, 2017 RECF6VED43z)tt-.jzkr.-td'f znq?-z WE&6 JAN 18 2017 PRINT DISTRIBUTION LIST BAKER HUGHES FIELD FINAL AO GCC COMPANY ConocoPhillips Alaska, Inc. LOGS WELL NAME 1B-18AL3-01 Surveys FIELD Prudhoe Bay Unit COUNTY North Slope Borough # OF COPIES BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(a)bakerhughes.com STATUS Final Replacement Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp DATA LOGGED 700 G Street. 2-/ x/201 7 M. K. BENDEr, Anchorage, Alaska 99510 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 7, 2016 TODAYS DATE January 16, 2017 Revision No Details: Requested by: COMPANY FIELD FINAL CD CD LOGS LOGS (digital/image) Surveys 1#(FinalSurveys) PERSON ATTENTION # OF COPIES OF COPIE # OF COPIES COMPANY FIELD FINAL CD CD ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BO$ PERSON ATTENTION # OF PRINTS # OF 1'KIN I S # OF COPIES 1 FBP North Slope 0 0 0 EOA, PBOC,PRB-20 (Office 109) D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. 0 0 0 IAttn: Ricky Elgaricio ATO 3-344 700 G Street Anchorage, AK 99510 3 I ExxonMobil, Alaska 0 0 0 Attn: Lvnda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4I State of Alaska - AOGCC 1 1 1 Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** 0 1 1 Attn: Resource Evaluation 5.50 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. 1 1 1 Petrotechnical Data Center, LR2-I 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 2 3 3 0 0 TOTALS FOR ALL PAGES: 0 2 3 3 0 0 21 6156 27928 ConocoPp hilli s RECEIVED JAN 18 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1B Pad 1 B-18AL3-01 50-029-22472-63 Baker Hughes INTEQ WMA a I Definitive Survey Report HUGHES 20 December, 2016 ` ConocoPhillips /Gill BAKER ConocoPhillips Definitive Survey Report HUGHES Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 B Pad Well: 113-18 Wellbore: 1 B-18AL3-01 Design: 1 B-18AL3-01 Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 113-18 Local Co-ordinate Reference: Well 1 B-18 TVD Reference: 1 B-18 @ 102.00usft MD Reference: 1 B-18 @ 102.00usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM Alaska NSK Sandbox Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 1 B-18AL3-01 Date 12/16/2016 Magnetics Model Name Sample Date (usft) BGGM2016 10/1/2016 Design 1 B-18AL3-01 1B -18(1B-18) Audit Notes: 8,350.60 1B-18AL3PB1 (113-18AL3PI31) Mean Sea Level Using Well Reference Point Using geodetic scale factor 5, 969, 647.06 usft 550,148.90usft usft Declination (I 18.01 Version: 1.0 Phase: ACTUAL Tie On Depth: 8,350.60 Vertical Section: +E/ -W Depth From (TVD) (usft) (usft) (1) 40.80 Survey Program 90.00 Date 12/16/2016 From To Survey (usft) (usft) Survey (Wellbore) 469.67 6,897.50 1B -18(1B-18) 7,392.00 8,350.60 1B-18AL3PB1 (113-18AL3PI31) 8,387.00 10,872.23 1B-18AL3-01 (1 B-1 8AL3-01) 12/20/2016 9:01:25AM Latitude: Longitude: Ground Level: Dip Angle V) 80.96 70° 19'40.248 N 149° 35' 35.868 W 61.20 usft Field Strength (nT) 57.551 +N/ -S +E/ -W Direction (usft) (usft) (1) 0.00 0.00 90.00 Survey Survey Tool Name Description Start Date End Date MWD MWD - Standard 4/28/1994 4/28/1994 MWD MWD - Standard 11/5/2016 11/11/2016 MWD MWD - Standard 11/21/2016 11/25/2016 Page 2 COMPASS 5000.1 Build 74 101, ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well 113-18 Project: Kuparuk River Unit TVD Reference: 1 B-18 @ 102.00usft Site: Kuparuk 1 B Pad MD Reference: 1 B-18 @ 102.00usft Well: 1B-18 North Reference: True Wellbore: 1B-18AL3-01 Survey Calculation Method: Minimum Curvature Design: 1 B-18AL3-01 Database: EDM Alaska NSK Sandbox Survey F/.%® BAKER HUGHES 12120/2016 9:01:25AM Page 3 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +Nl-S +E/ -W Northing Fasting DLS Section Survey Tool Name Annotation (usft) V) (I (usft) (usft) (usft) (usft) (ft) (ft) (01100') (ft) 8,350.60 89.39 57.58 6,696.47 6,594.47 -2,412.00 422.76 5,967,238.17 550,587.73 1.42 422.76 MWD (2) TIP 8,387.00 86.17 56.06 6,697.88 6,595.88 -2,392.10 453.20 5,967,258.27 550,618.03 9.77 453.20 MWD (3) KOP 8,415.79 83.97 61.38 6,700.36 6,598.36 -2,377.21 477.70 5,967,273.32 550,642.43 19.93 477.70 MWD (3) 8,445.81 84.71 66.94 6,703.32 6,601.32 -2,364.20 504.57 5,967,286.52 550,669.22 18.59 504.57 MWD (3) 8,475.55 88.13 71.09 6,705.18 6,603.18 -2,353.57 532.28 5,967,297.32 550,696.84 18.06 532.28 MWD (3) 8,505.49 88.62 76.20 6,706.03 6,604.03 -2,345.15 560.99 5,967,305.94 550,725.49 17.14 560.99 MWD (3) 8,535.22 92.06 76.46 6,705.85 6,603.85 -2,338.12 589.87 5,967,313.16 550,754.32 11.60 589.87 MWD (3) 8,565.47 95.87 73.40 6,703.76 6,601.76 -2,330.28 619.00 5,967,321.19 550,783.40 16.14 619.00 MWD (3) 8,595.44 94.76 68.59 6,700.98 6,598.98 -2,320.57 647.21 5,967,331.10 550,811.54 16.40 647.21 MWD (3) 8,625.50 94.37 64.18 6,698.59 6,596.59 -2,308.57 674.65 5,967,343.28 550,838.90 14.68 674.65 MWD (3) 8,655.37 94.09 59.81 6,696.38 6,594.38 -2,294.58 700.95 5,967,357.44 550,865.10 14.62 700.95 MWD (3) 8,685.47 92.40 56.22 6,694.68 6,592.68 -2,278.67 726.43 5,967,373.52 550,890.47 13.16 726.43 MWD (3) 8,715.22 89.69 53.75 6,694.14 6,592.14 -2,261.60 750.79 5,967,390.75 550,914.71 12.32 750.79 MWD (3) 8,745.15 86.99 51.70 6,695.00 6,593.00 -2,243.48 774.59 5,967,409.02 550,938.39 11.32 774.59 MWD (3) 8,775.29 84.06 49.34 6,697.36 6,595.36 -2,224.38 797.78 5,967,428.27 550,961.45 12.47 797.78 MWD (3) 8,805.40 84.56 53.07 6,700.34 6,598.34 -2,205.62 821.13 5,967,447.19 550,984.67 12.44 821.13 MWD (3) 8,835.07 84.69 57.56 6,703.12 6,601.12 -2,188.81 845.41 5,967,464.16 551,008.84 15.07 845.41 MWD (3) 8,865.19 83.82 63.04 6,706.14 6,604.14 -2,173.97 871.43 5,967,479.18 551,034.76 18.33 871.43 MWD (3) 8,895.15 84.65 67.64 6,709.15 6,607.15 -2,161.53 898.52 5,967,491.79 551,061.76 15.53 898.52 MWD (3) 8,925.25 84.03 66.55 6,712.12 6,610.12 -2,149.88 926.11 5,967,503.63 551,089.26 4.15 926.11 MWD (3) 8,955.01 84.16 62.54 6,715.18 6,613.18 -2,137.16 952.83 5,967,516.53 551,115.90 13.41 952.83 MWD (3) 8,985.36 84.93 57.88 6,718.07 6,616.07 -2,122.15 979.04 5,967,531.71 551,142.01 15.49 979.04 MWD (3) 9,015.81 86.28 59.49 6,720.40 6,618.40 -2,106.37 1,004.98 5,967,547.66 551,167.84 6.89 1,004.98 MWD (3) 9,045.49 88.00 63.33 6,721.88 6,619.88 -2,092.19 1,031.00 5,967,562.01 551,193.76 14.16 1,031.00 MWD (3) 9,075.07 88.10 67.53 6,722.89 6,620.89 -2,079.90 1,057.88 5,967,574.48 551,220.56 14.19 1,057.88 MWD (3) 9,105.53 87.76 71.54 6,723.99 6,621.99 -2,069.26 1,086.39 5,967,585.31 551,248.99 13.20 1,086.39 MWD (3) 9,137.69 87.23 76.39 6,725.40 6,623.40 -2,060.39 1,117.26 5,967,594.39 551,279.80 15.16 1,117.26 MWD (3) 9,165.61 88.03 79.82 6,726.55 6,624.55 -2,054.64 1,144.56 5,967,600.32 551,307.05 12.60 1,144.56 MWD (3) 9,195.50 68.62 83.94 61727.43 6,625.43 -2,050.42 1,174.13 5,967,604.73 551,336.59 13.92 1,174.13 MWD (3) 9,228.61 90.15 90.27 61727.78 6,625.78 -2,048.75 1,207.18 5,967,606.62 551,369.62 19.67 1,207.18 MWD (3) 12120/2016 9:01:25AM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips IMA ha ConocoPhillips Definitive Survey Report BHUGHES Company: ConocoPhillips (Alaska) Inc. -Kup1 Local Co-ordinate Reference: Well 1 B-18 Project: Kuparuk River Unit TVD Reference: 1 B-18 @ 102.00usft Site: Kuparuk 1 B Pad MD Reference: 1 B-18 @ 102.00usft Well: 1B-18 North Reference: True Wellbore: 1 B-18AL3-01 Survey Calculation Method: Minimum Curvature Design: 1 B-18AL3-01 Database: EDM Alaska NSK Sandbox Survey 12120/2016 9:01:25AM Page 4 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Eastin g DLS Section Survey Tool Name Annotation (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) 9,255.25 93.93 92.00 6,726.83 6,624.83 -2,049.28 1,233.79 5,967,606.28 551,396.24 15.60 1,233.79 MWD (3) 9,285.30 98.82 93.55 6,723.50 6,621.50 -2,050.72 1,263.61 5,967,605.03 551,426.06 17.06 1,263.61 MWD (3) 9,315.59 99.69 97.27 6,718.63 6,616.63 -2,053.54 1,293.36 5,967,602.41 551,455.83 12.46 1,293.36 MWD (3) 9,345.41 99.47 102.87 6,713.66 6,611.66 -2,058.68 1,322.30 5,967,597.47 551,484.80 18.53 1,322.30 MWD (3) 9,375.52 100.66 108.44 6,708.39 6,606.39 -2,066.67 1,350.84 5,967,589.67 551,513.39 18.64 1,350.84 MWD (3) 9,405.68 100.03 113.24 6,702.97 6,600.97 -2,077.22 1,378.56 5,967,579.30 551,541.18 15.79 1,378.56 MWD (3) 9,435.55 95.69 111.92 6,698.89 6,596.89 -2,088.58 1,405.87 5,967,568.13 551,568.56 15.17 1,405.87 MWD (3) 9,465.58 95.16 108.97 6,696.05 6,594.05 -2,099.02 1,433.88 5,967,557.87 551,596.64 9.94 1,433.88 MWD (3) 9,495.69 95.22 106.22 6,693.33 6,591.33 -2,108.08 1,462.46 5,967,549.00 551,625.28 9.10 1,462.46 MWD (3) 9,525.45 95.63 101.51 6,690.51 6,588.51 -2,115.18 1,491.22 5,967,542.10 551,654.08 15.82 1,491.22 MWD (3) 9,555.61 92.92 100.22 6,688.26 6,586.26 -2,120.85 1,520.75 5,967,536.63 551,683.64 9.95 1,520.75 MWD (3) 9,585.45 93.41 100.18 6,686.62 6,584.62 -2,126.13 1,550.07 5,967,531.55 551,713.00 1.65 1,550.07 MWD (3) 9,615.41 94.39 105.31 6,684.58 6,582.58 -2,132.72 1,579.22 5,967,525.15 551,742.18 17.39 1,579.22 MWD (3) 9,645.47 91.69 107.04 6,682.98 6,580.98 -2,141.08 1,608.04 5,967,516.98 551,771.06 10.66 1,608.04 MWD (3) 9,675.23 90.55 112.42 6,682.40 6,580.40 -2,151.12 1,636.04 5,967,507.13 551,799.12 18.48 1,636.04 MWD (3) ' 9,705.35 92.95 117.15 6,681.48 6,579.48 -2,163.74 1,663.36 5,967,494.70 551,826.53 17.60 1,663.36 MWD (3) 9,735.22 94.52 120.59 6,679.53 6,577.53 -2,178.12 1,689.46 5,967,480.49 551,852.72 12.64 1,689.46 MWD (3) 9,765.39 94.67 122.68 6,677.12 6,575.12 -2,193.90 1,715.07 5,967,464.89 551,878.42 6.92 1,715.07 MWD (3) 9,795.23 97.73 121.24 6,673.89 6,571.89 -2,209.60 1,740.23 5,967,449.36 551,903.69 11.32 1,740.23 MWD (3) 9,825.31 97.51 117.75 6,669.90 6,567.90 -2,224.27 1,766.18 5,967,434.86 551,929.73 11.52 1,766.18 MWD (3) 9,855.05 94.76 115.01 6,666.72 6,564.73 -2,237.41 1,792.66 5,967,421.90 551,956.30 13.02 1,792.66 MWD (3) 9,885.41 93.16 112.22 6,664.63 6,562.63 -2,249.54 1,820.41 5,967,409.96 551,984.13 10.57 1,820.41 MWD (3) 9,915.10 89.66 110.19 6,663.90 6,561.90 -2,260.27 1,848.08 5,967,399.41 552,011.86 13.63 1,848.08 MWD (3) 9,945.11 85.75 109.17 6,665.10 6,563.10 -2,270.37 1,876.30 5,967,389.50 552,040.15 13.46 1,876.30 MWD (3) 9,975.05 85.88 105.75 6,667.28 6,565.28 -2,279.33 1,904.78 5,967,380.74 552,068.69 11.40 1,904.78 MWD (3) 10,005.26 85.64 102.45 6,669.52 6,567.52 -2,286.66 1,934.00 5,967,373.59 552,097.95 10.92 1,934.00 MWD (3) 10,035.22 88.19 99.71 6,671.13 6,569.13 -2,292.41 1,963.35 5,967,368.04 552,127.34 12.48 1,963.35 MWD (3) 10,065.31 88.74 96.06 6,671.94 6,569.94 -2,296.54 1,993.14 5,967,364.12 552,157.15 12.26 1,993.14 MWD (3) 10,095.63 90.06 92.55 6,672.26 6,570.26 -2,298.81 2,023.37 5,967,362.04 552,187.39 12.37 2,023.37 MWD (3) 10,125.40 89.60 88.85 6,672.34 6,570.34 -2,299.18 2,053.13 5,967,361.88 552,217.15 12.52 2,053.13 MWD (3) 10,155.19 91.14 86.22 6,672.15 6,570.15 -2,297.90 2,082.89 5,967,363.36 552,246.90 10.23 2,082.89 MWD (3) 12120/2016 9:01:25AM Page 4 COMPASS 5000.1 Build 74 - ConocoPhillips FIN ii2 ConocoPhillips Definitive Survey Report BHUGHES Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 B Pad Well: 1B-18 Wellbore: 1 B-18AL3-01 Design: 1 B-18AL3-01 Survey Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 1 B-18 1 B-18 @ 102.00usft 1 B-18 @ 102.O0usft True Minimum Curvature EDM Alaska NSK Sandbox Annotation 12120/2016 9:01:25AM Page 5 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W DLS (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting (°1100') Section S Survey Y Tool Name (ft) (ft) (ft) 10,185.17 94.92 87.03 6,670.57 6,568.57 -2,296.13 2,112.77 5,967,365.32 552,276.77 12.89 2,112.77 MWD (3) 10,215.17 97.08 86.98 6,667.43 6,565.43 -2,294.57 2,142.57 5,967,367.08 552,306.54 7.20 2,142.57 MWD (3) 10,245.23 95.32 93.78 6,664.18 6,562.18 -2,294.78 2,172.43 5,967,367.08 552,336.41 23.24 2,172.43 MWD (3) 10,276.51 96.77 91.86 6,660.89 6,558.89 -2,296.31 2,203.50 5,967,365.75 552,367.48 7.66 2,203.50 MWD (3) 10,306.34 97.92 91.05 6,657.07 6,555.07 -2,297.06 2,233.07 5,967,365.20 552,397.06 4.70 2,233.07 MWD (3) 10,335.15 98.88 84.67 6,652.86 6,550.86 -2,296.00 2,261.54 5,967,366.45 552,425.51 22.16 2,261.54 MWD (3) 10,365.71 98.56 80.01 6,648.22 6,546.22 -2,291.97 2,291.46 5,967,370.68 552,455.41 15.11 2,291.46 MWD (3) 10,395.40 97.05 76.63 6,644.19 6,542.19 -2,286.02 2,320.26 5,967,376.82 552,484.17 12.37 2,320.26 MWD (3) 10,425.49 94.86 78.53 6,641.07 6,539.07 -2,279.58 2,349.49 5,967,383.45 552,513.34 9.61 2,349.49 MWD (3) 10,455.21 94.36 83.24 6,638.68 6,536.68 -2,274.89 2,378.73 5,967,388.34 552,542.55 15.89 2,378.73 MWD (3) 10,485.40 95.57 87.78 6,636.07 6,534.07 -2,272.53 2,408.71 5,967,390.90 552,572.51 15.51 2,408.71 MWD (3) 10,515.15 94.58 92.43 6,633.43 6,531.43 -2,272.59 2,438.33 5,967,391.04 552,602.13 15.92 2,438.33 MWD (3) 10,545.23 92.98 95.39 6,631.45 6,529.45 -2,274.64 2,468.27 5,967,389.19 552,632.08 11.17 2,468.27 MWD (3) 10,575.11 88.89 96.81 6,630.96 6,528.96 -2,277.81 2,497.97 5,967,386.22 552,661.80 14.49 2,497.97 MWD (3) 10,605.55 89.33 100.52 6,631.43 6,529.43 -2,282.40 2,528.05 5,967,381.83 552,691.91 12.27 2,528.05 MWD (3) 10,635.50 89.85 104.21 6,631.65 6,529.65 -2,288.81 2,557.30 5,967,375.62 552,721.20 12.44 2,557.30 MWD (3) 10,665.23 90.03 108.76 6,631.68 6,529.68 -2,297.24 2,585.80 5,967,367.37 552,749.75 15.32 2,585.80 MWD (3) 10,695.23 89.82 103.27 6,631.72 6,529.72 -2,305.52 2,614.63 5,967,359.29 552,778.63 18.31 2,614.63 MWD (3) 10,725.15 88.19 102.98 6,632.24 6,530.24 -2,312.31 2,643.76 5,967,352.70 552,807.80 5.53 2,643.76 MWD (3) 10,755.43 89.54 101.31 6,632.84 6,530.84 -2,318.68 2,673.36 5,967,346.53 552,837.43 7.09 2,673.36 MWD (3) 10,785.21 91.75 97.42 6,632.50 6,530.50 -2,323.52 2,702.73 5,967,341.88 552,866.84 15.02 2,702.73 MWD (3) 10,815.23 92.73 93.39 6,631.33 6,529.33 -2,326.35 2,732.59 5,967,339.25 552,896.71 13.81 2,732.59 MWD (3) 10,845.09 92.98 89.78 6,629.84 6,527.84 -2,327.17 2,762.39 5,967,338.63 552,926.52 12.10 2,762.39 MWD (3) 10,872.23 92.83 86.84 6,628.47 6,526.47 -2,326.37 2,789.48 5,967,339.61 552,953.60 10.83 2,789.48 MWD (3) 10,900.00 92.83 86.84 6,627.09 6,525.10 -2,324.84 2,817.18 5,967,341.32 552,981.28 0.00 2,817.18 PROJECTED to TO Annotation 12120/2016 9:01:25AM Page 5 COMPASS 5000.1 Build 74 we as BAKER Date: HUGHES To: RECEIVE JAN 0 6 2017 December 22, 2016 Makana Bender AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 From: Letter of Transmittal DATA LOGGED \ /?P /201 -C K. BENDER Yosha Ragbirsingh / Michael Soper Baker Hughes INTEQ 795 East 94th Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 1B -18A 21 6108 27 86 1B-18AL1 2 1 F 1 09 27 86 1B-18AL2 1B-18AL3PB1 2 1 61 10 27 86 4 1B-18AL3 2 1 6 7 44 27 86 5 1B-18AL3-01 2 1 6 1 4 4 27 86 6 21 61 56 27867 (6) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael. Soper@BakerHughes.com Yosha Ragbirsingh, Baker Hughes, Survey Manager Yo sha. Ragbirsingh@B akerHughe s. com ConocoPh i l l ips JAN 0 6 2017 ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1B Pad 1 B-18AL3-01 50-029-22472-63 Baker Hughes I NTEQ Definitive Survey Report 20 December, 2016 MEMM FeA a I BAKER HUGHES �. ConocoPhillips Fur kI ConocoPhillips Definitive Survey Report HUGHES Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well 1 B-18 Project: Kuparuk River Unit TVD Reference: 1 B-18 @ 102.00usft Site: Kuparuk 1 B Pad MD Reference: 1 B-18 @ 102.00usft Well: 1B-18 North Reference: True Wellbore: 1B-18AL3-01 Survey Calculation Method: Minimum Curvature Design: 1 B-18AL3-01 Database: EDM Alaska NSK Sandbox Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level F Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point r Map Zone: Alaska Zone 04 Using geodetic scale factor Well 1B-18 Well Position +N/-S 0.00 usft Northing: 5,969,647.06 usft Latitude: 70° 19'40.248 N +E/-W 0.00 usft Easting: 550,148.90 usft Longitude: 149° 35' 35.868 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 61.20 usft Wellbore 113-18AL3-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1 (`) (nT) BGGM2016 10/1/2016 18.01 80.96 57,551 Design 1 B-18AL3-01 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 8,350.60 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (I 40.80 0.00 0.00 90.00 Survey Program Date 12/16/2016 From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 469.67 6,897.50 1B-18(1B-18) MWD MWD- Standard 4/28/1994 4/28/1994 7,392.00 8,350.60 1B-18AL3PB1 (113-18AL3PB1) MWD MWD- Standard 11/5/2016 11/11/2016 8,387.00 10,872.23 1B-18AL3-01 (1B-18AL3-01) MWD MWD- Standard 11/21/2016 11/25/2016 12120/2016 9:01:25AM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Company: Project: Site: Well: Wellbore: Design: Survey ConocoPhillips (Alaska) Inc. -Kupl Kuparuk River Unit Kuparuk 1B Pad 113-18 1 B-18AL3-01 1 B-18AL3-01 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: Well 1 B-18 TVD Reference: 1 B-18 @ 102.00usft MD Reference: 1 B-18 @ 102.00usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM Alaska NSK Sandbox Vertical Section Survey Tool Name (ft) 422.76 Map Map MWD (3) MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Est ng DLS (usft) (1 (1) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') 8,350.60 89.39 57.58 6,696.47 6,594.47 -2,412.00 422.76 5,967,238.17 550,587.73 1.42 8,387,0D 86.17 56.06 6,697.88 6,595.88 -2,392.10 453.20 5,967,258.27 550,618.03 9.77 8,415.79 83.97 61.38 6,700.36 6,598.36 -2,377.21 477.70 5,967,273.32 550,642.43 19.93 8,445.81 84.71 66.94 6,703.32 6,601.32 -2,36420 504.57 5,967,286.52 550,669.22 18.59 8,475.55 88.13 71.09 6,705.18 6,603.18 -2,353.57 532.28 5,967,297.32 550,696.84 18.06 8,505.49 88.62 76.20 6,706.03 6,604.03 -2,345.15 560.99 5,967,305.94 550,725.49 17.14 8,535.22 92.06 76.46 6,705.85 6,603.85 -2,338.12 589.87 5,967,313.16 550,754.32 11.60 8,565.47 95.87 73.40 6,703.76 6,601.76 -2,330.28 619.00 5,967,321.19 550,783.40 16.14 8,595.44 94.76 68.59 6,700.98 6,598.98 -2,320.57 647.21 5,967,331.10 550,811.54 16.40 8,625.50 94.37 64.18 6,698.59 6,596.59 -2,308.57 674.65 5,967,343.28 550,838.90 14.68 8.,655.37 94.09 59.81 6,696.38 6,594.38 -2,294.58 700.95 5,967,357.44 550,865.10 14.62 8,685.47 92.40 56.22 6,694.68 6,592.68 -2,278.67 726.43 5,967,373.52 550,890.47 13.16 8,715.22 89.69 53.75 6,694.14 6,592.14 -2,261.60 750.79 5,967,390.75 550,914.71 12.32 8,745.15 86.99 51.70 6,695.00 6,593.00 -2,243.48 774.59 5,967,409.02 550,938.39 11.32 8,775.29 84.06 49.34 6,697.36 6,595.36 -2,224.38 797.78 5,967,428.27 550,961.45 12.47 8,805.40 84.56 53.07 6,700.34 6,598.34 -2,205.62 821.13 5,967,447.19 550,984.67 12.44 8,835.07 84.69 57.56 6,703.12 6,601.12 -2,188.81 845.41 5,967,464.16 551,008.84 15.07 8,865.19 83.82 63.04 6,706.14 6,604.14 -2,173.97 871.43 5,967,479.18 551,034.76 18.33 8,895.15 84.65 67.64 6,709.15 6,607.15 -2,161.53 898.52 5,967,491.79 551,061.76 15.53 8,925.25 84.03 66.55 6,712.12 6,610.12 -2,149.88 926.11 5,967,503.63 551,089.26 4.15 8,955.01 84.16 62.54 6,715.18 6,613.18 -2,137.16 952.83 5,967,516.53 551,115.90 13.41 8,985.36 84.93 57.88 6,718.07 6,616.07 -2,122.15 979.04 5,967,531.71 551,142.01 15.49 9,015.81 86.28 59.49 6,720.40 6,618.40 -2,106.37 1,004.98 5,967,547.66 551,167.84 6.B9 9,045.49 88.00 63.33 6,721.88 6,619.88 -2,092.19 1,031.00 5,967,562.01 551,193.76 14.16 9,075.07 88.10 67.53 6,722.89 6,620.89 -2,079.90 1,057.88 5,967,574.48 551,220.56 14.19 9,105.53 87.76 71.54 6,723.99 6,621.99 -2,069.26 1,086.39 5,967,585.31 551,248.99 13.20 9,137.69 87.23 76.39 6,725.40 6,623.40 -2,060.39 1,117.26 5,967,594.39 551,279.80 15.16 9,165.61 88.03 79.82 6,726.55 6,624.55 -2,054.64 1,144.56 5,967,600.32 551,307.05 12.60 9,195.50 88.62 83.94 6,727.43 6,625.43 -2,050.42 1,174.13 5,967,604.73 551,336.59 13.92 9,228.61 90.15 90.27 6,727.78 6,625.78 -2,048.75 1,207.18 5,967,606.62 551,369.62 19.67 Vertical Section Survey Tool Name (ft) 422.76 MWD (2) 453.20 MWD (3) 477.70 MWD (3) 504.57 MWD (3) 532.28 MWD (3) 560.99 MWD (3) 589.87 MWD (3) 619.00 MWD (3) 647.21 MWD (3) 674.65 MWD (3) 70D.95 MWD (3) 726.43 MWD (3) 750.79 MWD (3) 774.59 MWD (3) 797.78 MWD (3) 821.13 MWD (3) 845.41 MWD (3) 871.43 MWD (3) 898.52 MWD (3) 926.11 MWD (3) 952.83 MWD (3) 979.04 MWD (3) 1,004.98 MWD (3) 1,031.00 MWD (3) 1,D57.88 MWD (3) 1,086.39 MWD (3) 1,117.26 MWD (3) 1,144.56 MWD (3) 1,174.13 MWD (3) 1,207.18 MWD (3) Annotation TIP KOP rias BAKER HUGHES 12/20/2016 9:01:25AM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips //al ConocoPhillips Definitive Survey Report BHUGHES Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well 1 B-18 Project: Kuparuk River Unit TVD Reference: 1 B-18 @ 102.00usft Site: Kuparuk 113 Pad MD Reference: 1 B-18 @ 102.00usft Well: 1B-18 North Reference: True Wellbore: 1 B-18AL3-01 Survey Calculation Method: Minimum Curvature Design: 1 B-18AL3-01 Database: EDM Alaska NSK Sandbox Survey Annotation COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (1) (1) (usft) (usft) (usft) (usft) (°/100') Survey Tool Name (ft) (ft) (ft) 9,255.25 93.93 92.00 6,726.83 6,624.83 -2,049.28 1,233.79 5,967,606.28 551,396.24 15.60 1,233.79 MWD (3) 9,285.30 98.82 93.55 6,723.50 6,621.50 -2,050.72 1,263.61 5,967,605.03 551,426.06 17.06 1,263.61 MWD (3) 9,315.59 99.69 97.27 6,718.63 6,616.63 -2,053.54 1,293.36 5,967,602.41 551,455.83 12.46 1,293.36 MWD (3) 9,345.41 99.47 102.87 6,713.66 6,611.66 -2,058.68 1,322.30 5,967,597.47 551,484.80 18.53 1,322.30 MWD (3) 9,375.52 100.66 108.44 6,708.39 6,606.39 -2,066.67 1,350.84 5,967,589.67 551,513.39 18.64 1,350.84 MWD (3) 9,405.68 100.03 113.24 6,702.97 6,600.97 -2,077.22 1,378.56 5,967,579.30 551,541.18 15.79 1,378.56 MWD (3) 9,435.55 95.69 111.92 6,698.89 6,596.89 -2,088.58 1,405.87 5,967,568.13 551,568.56 15.17 1,405.87 MWD (3) 9,465.58 95.16 108.97 6,696.05 6,594.05 -2,099.02 1,433.88 5,967,557.87 551,596.64 9.94 1,433.88 MWD (3) 9,495.69 95.22 106.22 6,693.33 6,591.33 -2,108.08 1,462.46 5,967,549.00 551,625.28 9.10 1,462.46 MWD (3) 9,525.45 95.63 101.51 6,690.51 6,588.51 -2,115.18 1,491.22 5,967,542.10 551,654.08 15.82 1,491.22 MWD (3) 9,555.61 92.92 100.22 6,688.26 6,586.26 -2,120.85 1,520.75 5,967,536.63 551,683.64 9.95 1,520.75 MWD (3) 9,585.45 93.41 100.18 6,686.62 6,584.62 -2,126.13 1,550.07 5,967,531.55 551,713.00 1.65 1,550.07 MWD (3) 9,615.41 94.39 105.31 6,684.58 6,582.58 -2,132.72 1,579.22 5,967,525.15 551,742.18 17.39 1,579.22 MWD (3) 9,645.47 91.69 107.04 6,682.98 6,580.98 -2,141.08 1,608.04 5,967,516.98 551,771.06 10.66 1,608.04 MWD (3) 9,675.23 90.55 112.42 6,682.40 6,580.40 -2,151.12 1,636.04 5,967,507.13 551,799.12 18.48 1,636.04 MWD (3) 9,705.35 92.95 117.15 6,681.48 6,579.48 -2,163.74 1,663.36 5,967,494.70 551,826.53 17.60 1,663.36 MWD (3) 9,735.22 94.52 120.59 6,679.53 6,577.53 -2,178.12 1,689.46 5,967,480.49 551,852.72 12.64 1,689.46 MWD (3) 9,765.39 94.67 122.68 6,677.12 6,575.12 -2,193.90 1,715.07 5,967,464.89 551,878.42 6.92 1,715.07 MWD (3) 9,795.23 97.73 121.24 6,673.89 6,571.89 -2,209.60 1,740.23 5,967,449.36 551,903.69 11.32 1,740.23 MWD (3) 9,825.31 97.51 117.75 6,669.90 6,567.90 -2,224.27 1,766.18 5,967,434.86 551,929.73 11.52 1,766.16 MWD (3) 9,855.05 94.76 115.01 6,666.72 6,564.73 -2,237.41 1,792.66 5,967,421.90 551,956.30 13.02 1,792.66 MWD (3) 9,885.41 93.16 112.22 6,664.63 6,562.63 -2,249.54 1,820.41 5,967,409.96 551,984.13. 1D.57 1,820.41 MWD (3) 9,915.10 89.66 110.19 6,663.90 6,561.90 -2,260.27 1,848.08 5,967,399:41 552,011.86 13.63 1,848.08 MWD (3) 9,945.11 85.75 109.17 6,665.10 6,563.10 -2,270.37 1,876.30 5,967,389.50 552,040.15 13.46 1,876.30 MWD (3) 9,975.05 85.88 105.75 6,667.28 6,565.28 -2,279.33 1,904.78 5,967,380.74 552,068.69 1.1.40 1,904.78 MWD (3) 10,005.26 85.64 102.45 6,669.52 6,567.52 -2,286.66 1,934.00 5,967,373.59 552,097.95 10.92 1,934.00 MWD (3) 10,035.22 88.19 99.71 6,671.13 6,569.13 -2,292.41 1,963.35 5,967,368.04 552,127.34 12.48 1,963.35 MWD (3) 10,065.31 88.74 96.06 6,671.94 6,569.94 -2,296.54 1,993.14 5,967,364.12 552,157.15 12.26 1,993.14 MWD (3) 10,095.63 90.06 92.55 6,672.26 6,570.26 -2,298.81 2,023.37 5,967,362.04 552,187.39 12.37 2,023.37 MWD (3) 10,125.40 89.60 88.85 6,672.34 6,570.34 -2,299.18 2,053.13 5,967,361.68 552,217.15 12.52 2,053.13 MWD (3) 10,155.19 91.14 86.22 6,672.15 6,570.15 -2,297.90 2,082.89 5,967,363.36 552,246.90 10.23 2,082.89 MWD (3) 12/20/2016 9:01:25AM Page 4 Annotation COMPASS 5000.1 Build 74 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kupl Vertical Easting Local Co-ordinate Reference: Project: Kuparuk River Unit (ft) 552,276.77 ND Reference: 2,112.77 MWD (3) Site: Kuparuk 1 B Pad 2,142.57 MWD (3) 1 552,336.41 23.24 MD Reference: 552,367.48 Well: 1B-18 552,397.06 4.70 2,233.07 MWD (3) 552,425.51 North Reference: 2,261.54 MWD (3) Wellbore: 1 B-18AL3-01 2,291.46 MWD (3) 552,484.17 12.37 2,320.26 MWD (3) Survey Calculation Method: Design: 1 B-18AL3-01 15.89 2,378.73 MWD (3) 552,572.51 15.51 Database: 552,602.13 Survey 2,438.33 MWD (3) 552,632.08 11.17 2,468.27 MWD (3) 552,661.80 14.49 2,497.97 MWD (3) 552,691.91 12.27 2,528.05 MWD (3) 552,721.20 12.44 2,557.30 MWD (3) 552,749.75 Map MD Inc Azi TVD TVDSS +N1 -S +E/ -W 552,837.43 7.09 2,673.36 MWD (3) 552,866.84 15.02 2,702.73 MWD (3). 552,896.71 13.81 Northing (usft) (°) (°) (usft) (usft) (usft) (usft) 0.00 2,817.18 PROJECTED to TD (ft) 10,185.17 94.92 87.03 6,670.57 6,568.57 -2,296.13 2,112.77 5,967,365.32 1D,215.17 97. D8 86.98 6,667.43 6,565.43 -2,294.57 2,142.57 5,967,367.08 1D,245.23 95.32 93.78 6,664.18 6,562.18 -2,294.78 2,172.43 5,967,367.08 1D,276.51 96.77 91.86 6,660.89 6,558.89 -2,296.31 2,203.50 5,967,365.75 10,306.34 97.92 91.05 6,657.07 6,555.07 -2,297.06 2,233.07 5,967,365.20 10,335.15 98.88 84.67 6,652.86 6,550.86 -2,296.00 2,261.54 5,967,366.45 3. 10,365.71 98.56 80.01 6,648.22 6,546.22 -2,291.97 2,291.46 5,967,370.68 10,395.40 97.05 76.63 6,644.19 6,542.19 -2,286.02 2,320.26 5,967,376.82 10,425.49 94.86 78.53 6,641.07 6,539.07 -2,279.58 2,349.49 5,967,383.45 10,455.21 94.36 83.24 6,638.68 6,536.68 -2,274.89 2,378.73 5,967,388.34 10,485.40 95.57 87.78 6,636.07 6,534.07 -2,272.53 2,408.71 5,967,390.90 ' 10,515.15 a 94.58 92.43 6,633.43 6,531.43 -2,272.59 2,438.33 5,967,391.04 10,545.23 92.98 95.39 6,631.45 6,529.45 -2,274.64 2,468.27 5,967,389.19 10,575.11 88.89 96.81 6,630.96 6,528.96 -2,277.81 2,497.97 5,967,386.22 10,605.55 89.33 100.52 6,631.43 6,529.43 -2,282.40 2,528.05 5,967,381.83 10,635.50 89.85 104.21 6,631.65 6,529.65 -2,288.81 2,557.30 5,967,375.62 10,665.23 90.03 108.76 6,631.68 6,529.68 -2,297.24 2,585.80 5,967,367.37 10,695.23 89.82 103.27 6,631.72 6,529.72 -2,305.52 2,614.63 5,967,359.29 10,725.15 88.19 102.98 6,632.24 6,530.24 -2,312.31 2,643.76 5,967,352.70 10,755.43 89.54 101.31 6,632.84 6,530.84 -2,318.68 2,673.36 5,967,346.53 10,785.21 91.75 97.42 6,632.50 6,530.50 -2,323.52 2,702.73 5,967,341.88 10,815.23 92.73 93.39 6,631.33 6,529.33 -2,326.35 2,732.59 5,967,339.25 10,845.09 92.98 89.78 6,629.84 6,527.84 -2,327.17 2,762.39 5,967,338.63 1D,872.23 92.83 86.84 6,628.47 6,526.47 -2,326.37 2,789.48 5,967,339.61 10,900.00 92.83 86.84 6,627.09 6,525.10 -2,324.84 2,817.18 5,967,341.32 Fel fig BAKHUGHES Well 1 B-18 1 B-18 @ 102.00usft 1 B-18 @ 102.00usft True Minimum Curvature EDM Alaska NSK Sandbox Map Vertical Easting DLS (°1100') Section Survey Tool Name Annotation (ft) (ft) 552,276.77 12.89 2,112.77 MWD (3) 552,306.54 7.20 2,142.57 MWD (3) 1 552,336.41 23.24 2,172.43 MWD (3) 552,367.48 7.66 2,203.50 MWD (3) 552,397.06 4.70 2,233.07 MWD (3) 552,425.51 22.16 2,261.54 MWD (3) 552,455.41 15.11 2,291.46 MWD (3) 552,484.17 12.37 2,320.26 MWD (3) 552,513.34 9.61 2,349.49 MWD (3) ' 552,542.55 15.89 2,378.73 MWD (3) 552,572.51 15.51 2,408.71 MWD (3) 552,602.13 15.92 2,438.33 MWD (3) 552,632.08 11.17 2,468.27 MWD (3) 552,661.80 14.49 2,497.97 MWD (3) 552,691.91 12.27 2,528.05 MWD (3) 552,721.20 12.44 2,557.30 MWD (3) 552,749.75 15.32 2,585.80 MWD (3) 552,778.63 18.31 2,614.63 MWD (3) 552,807.80 5.53 2,643.76 MWD (3) 552,837.43 7.09 2,673.36 MWD (3) 552,866.84 15.02 2,702.73 MWD (3). 552,896.71 13.81 2,732.59 MWD (3) 552,926.52 12.10 2,762.39 MWD (3) 552,953.60 10.83 2,789.48 MWD (3) 552,981.28 0.00 2,817.18 PROJECTED to TD 12/20/2016 9.01:25AM Page 5 COMPASS 5000.1 Build 74 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION ! F ri, 9 WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: Oil ❑� Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspende(E] 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG[:] WDSPL ❑ No. of Completions: 1 b. Well Class: Development 0 Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or 1 4 Zo►� Aband.: 14. Permit to Drill Number/ Sundry: 216-156 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 0. 114129,12946 15. API Number: 50-029-22472-63-00 4a. Location of Well (Governmental Section): Surface: 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM Top of Productive Interval: 2893' FNL, 5122' FEL, Sec. 10, T11 N, R1 OE, UM Total Depth: 2826' FNL, 2758' FEL, Sec. 10, T11 N, R1 OE, UM 8. Date TD Reached: - „�1t1Z5'2otto 16. Well Name and Number: KRU 1B-18AL3-01 9. Ref Elevations: KB: 10-4 GL 61 BF: 41 17. Field / Pool(s): Kuparuk River Field/ Oil Pool 10. Plug Back Depth MD/TVD: NA 18. Property Designation: ADL 25648 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 550147 y- 5969648 Zone- 4 TPI: x- 550618 y- 5967258 Zone- 4 Total Depth: x- 552981 y- 5967341 Zone- 4 11. Total Depth MD1TVD: 10,900' MD/6,627" TVD 19. Land Use Permit: ALK 466 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: 1602'/1602' 5. Directional or Inclination Survey: Yes ❑✓ (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: 8387' MD/ 6698' TVD 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/RES 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD HOLE SIZE CEMENTING RECORD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM PULLED 16" 62.5 H-40 43 121 43 121 24" 200 sx ASI 7-5/8" 29.7 L-80 41 4256 41 4148 9.875" 650 ASIII, 300 sx G 5"x5.5" 17/18 L-80 26 7809 26 6930 6.75" 210 sx G 2-3/8" 4.6 L-80 8094 10900 67056627 3 Slotted Liner I +- 24. Open to production or injection? Yes ❑ No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number): Perfs cement squeezed prior to CTD operations Slotted Liner from 8387'-10092' MD /6698'-6654' TVD COMPLETION DATE L I Iq I LU VERIFIED LL 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3-1/2" 7061 6934' MD /6244' TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑✓ Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 12/22/2016 Method of Operation (Flowing, gas lift, etc.): Gas Lift Date of Test: 12/25/2016 Hours Tested: 18 Production for Test Period Oil -Bbl: 476 Gas -MCF: 915 Water -Bbl: 55 Choke Size: 176 bean Gas -Oil Ratio: 2107 scf/stb Flow Tubing Press. 140 Casinq Press: 1042 Calculated 24 -Hour Rate Oil -Bbl: 590 Gas -MCF: 1244 Water -Bbl: 73 Oil Gravity - API (corr): 21 Form 10-407 Revised11/2015 ONTINUED ON PAGE 2 C e? Submit ORIGINIAL on �T� z/,(5-//,7--CONTINUED -,/1 s J/?, . RE3Df1nS 1,t- JAN 18 20 28. CORE DATA Conventional Core(s): Yes ❑ No 0 Sidewall Cores: Yes ❑ No E] If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No El If yes, list intervals and formations tested, briefly summarizing test results. Base PERMAFROST 1602 1602 KOP (Kuparuk A4) 8387 6698 Attach separate pages to this form, if needed, and submit detailed test TPI (Kuparuk A Sand) 8387 6698 information, including reports, per 20 AAC 25.071. TD (Kuparuk A4) 10900 6627 31. List of Attachments: Summary of daily operations, well schematics and final directional surveys. Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Contact: Jeff ConneV Email: 'eff.s.cOnnell cOnOcO hull s.com Printed Name: G. Eller Title: Principal CTD Engineer Signature: Phone: (907)-263-4172 Date: Z INSTRUCTIONS General: This form and the requi d attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 11/2015 Submit ORIGINAL Only 1 B-18 CTD Working Schematic 16" 62# H-40 shoe @ 121' MD 7-5/8" 29.7# L-80 shoe @ 4147' MD 5.5" 17# L-80 shoe @ 6997' M D C -sand perfs (sqz'd) 7131'- 7273' MD KOP @ 7392' MD 31/" x 5" TTWS set at 0° toolface KOP @ 7502' MD 3'/z" x 5" TTWS set at 330° toolface A -sand pe rfs (sqz'd) 7256'- 7575' MD C c Tapered Prod Csq 5'/2, 17#, L-80, 0'-7044' MD 5", 18#, L-80, 7044'-7809' MD Cameo BP -6 injection nipple @ 1951' MD ID = 2.813" 3-1/2" 9.3# L-80 ELIE 8rd Tubing to surface 3-1/2" Cameo gas lift mandrels @ 2629', 4223', 5498', 6335'& 6862' X -nipple @ 6895' MD ID = 2.812"ID Baker GBH -22 Loactor & Seal assembly at 6918 Baker 3-1/2" PBR @ 6920' MD (3" ID) Baker KBH-22 anchor seal assembly at 6933' MD Baker FA -1 packer @ 6934' MD 5" casing sealbore extension @ 7044' (4.0" ID) Liner -top packer set post -rig at 6994' MD & swell packer at 7535' MD (in A5 sand) to ensure no C - sand production 1 B-1 8A TD @ 9500' MD Liner Bottom at 8315' MD Liner Top at 7412' MD (in 5") 16-18AL2 (West) KO billet at 7610' MD TD at 8,568' MD Liner from 8196'- 6994' MD 1B-18AL3 (Northeast) KO billet at 8094' MD TD at 9788' MD Liner from 9785'- 7609' MD 1B-18AL3PB1 (Northeast) TD @ 9098' MD 1B-18AL1 (East) KO billet at 8449' MD TD at 10,200' MD Liner from 10,092'- 8387' MD 1B-18AL3-01 (East) KO billet at 8387MD TD at 10,900' MD Liner from 10,900'- 8094' MD Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/28/2016 10/28/2016 1.00 MIRU MOVE RURD P Complete pre move check list. 0.0 0.0 12:00 13:00 10/28/2016 10/28/2016 4.00 MIRU MOVE MOB P Trucks on location, PJSM, stage pits 0.0 0.0 13:00 17:00 on pad, pull sub off 2B-02, hook up jeeps, move rig to 2C pad access road. 10/28/2016 10/28/2016 1.00 MIRU MOVE WAIT T Wait at 2C pad access for CPF2 crew 0.0 0.0 17:00 18:00 change out. 10/28/2016 10/28/2016 3.00 MIRU MOVE MOB P Move rig from 2C pad to 1B-pad. 0.0 0.0 18:00 21:00 10/28/2016 10/28/2016 0.50 MIRU MOVE MOB P Remove jeeps, prep 1B-18, set 0.0 0.0 21:00 21:30 herculite and mat. 10/28/2016 10/28/2016 1.25 MIRU MOVE MOB P Spot sub over 1B-18, lay mats and set 0.0 0.0 21:30 22:45 down. 10/28/2016 10/29/2016 1.25 MIRU MOVE MOB P Spot pits, lay mays and set down 0.0 0.0 22:45 00:00 10/29/2016 10/29/2016 1.00 MIRU MOVE RURD P Release trucks, lower BOPE's, work 0.0 0.0 00:00 01:00 on post rig move check list. 10/29/2016 10/29/2016 3.00 MIRU MOVE RURD P Start rig up checklist. Hook up steam. 0.0 0.0 01:00 04:00 berm celler. Hook up PUTZ interconnect. RU flowline. 10/29/2016 10/29/2016 2.00 MIRU WHDBOP NUND P NU BOPE. Install choke hose and 0.0 0.0 04:00 06:00 annular hydraulics. Check tree bolts, all tight (40 minutes). Grease choke valves and BOP valves. 10/29/2016 10/29/2016 3.00 MIRU WHDBOP CTOP P Perform Slack Management, trim 105 0.0 0.0 06:00 09:00 ft of coil to find wire, install CTC, pull tested to 52 k, re-headed BHI upper quick (sim-ops), 10/29/2016 10/29/2016 8.00 MIRU WHDBOP BOPE P Start BOP testing, test witness waived 0.0 0.0 09:00 17:00 per state tester Jeff Jones, 3,500 psi high/250 psi low/2,500 annular preventor. Stab INJH test inner reel valve, stripper, and tiger tank line. 10/29/2016 10/29/2016 2.50 MIRU WHDBOP PRTS P Pressure test CTC 4,000 psi, good. 0.0 0.0 17:00 19:30 Post BOPE grease choke and BOPE valves. RD testing equipment, freeze protect test pump, store test joint back onto rack in pipe shed. SimOps- Calibrate MM with Dave Smith. 10/29/2016 10/29/2016 2.50 MIRU WHDBOP MPSP P PJSM, Load BPV equipment, MU and 0.0 0.0 19:30 22:00 lubricate out BPV, tubing 230 psi, bleed tubing to zero, still flowing, RD BPV equipment, off load same while performing valve alignment check list, blow down TT line. 10/29/2016 10/30/2016 2.00 PROD1 WHPST PULD P PJSM- Install checks, MU milling BHA 0.0 74.3 22:00 00:00 #1, 0.6° motor with 2.79" string reamer and 2.79" no-go window mill, MU to CoilTrak, surface test 10/30/2016 10/30/2016 1.85 PROD1 WHPST TRIP P RIH with window milling BHA #1 74.3 6,930.0 00:00 01:51 10/30/2016 10/30/2016 0.45 PROD1 W HPST DLOG P Tie in to K1 for minus 4.0 ft correction, 6,930.0 6,995.0 01:51 02:18 continue to log HRZ 10/30/2016 10/30/2016 0.70 PROD1 W HPST TRIP P RIH, dry tag pinch point at 7,506 ft, 6,995.0 7,506.0 02:18 03:00 1 PUW 34k, set milling parameters. Page 1/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation. (ftKB) End Depth (ftKB) 10/30/2016 10/30/2016 1.10 PROD1 WHPST WPST P 7505.3 ft. Milling 1.53 bpm at 3,769 7,506.0 7,506.7 03:00 04:06 psi FS per recomended practice, WHP 0, IA 400, OA 3, getting crude stringers back, take 5 bbls out, adjust WHP to 200 psi, pumping 7 bph away 10/30/2016 10/30/2016 0.60 PROD1 WHPST WPST T 7,506.7 ft. Stall motor, PU, set 7,506.7 7,506.7 04:06 04:42 parameters, free spin higher, attempt to restart milling and stalled, chunked motor suspect, unable to pump through bit, Open EDC. 10/30/2016 10/30/2016 2.00 PROD1 WHPST TRIP T POOH for new motor 7,506.7 74.3 04:42 06:42 10/30/2016 10/30/2016 1.50 PROD1 WHPST PULD T PJSM, undeploy failed milling BHA# 1, 74.3 0.0 06:42 08:12 WHP dropped to zero, check well for flow (no-flow) LD motor 10/30/2016 10/30/2016 1.25 PROD1 WHPST PULD T PU/MU BHA# 2 with new motor and 0.0 74.3 08:12 09:27 mills. 10/30/2016 10/30/2016 1.75 PROD1 WHPST TRIP T Tag up set counters, RIH 74.3 6,960.0 09:27 11:12 10/30/2016 10/30/2016 0.50 PROD1 WHPST DLOG T Log the K1 correction of minus 4.5', 6,960.0 7,506.0 11:12 11:42 continue RIH to pinch point. Note: NPT 7.0 hrs Baker Hughes. 10/30/2016 10/30/2016 8.60 PROD1 WHPST MILL P Dry tag pinch point at 7,506', PUW 32 7,506.0 7,527.0 11:42 20:18 k, 1.45 bpm at 3735 psi FS, BHP 3,597, open choke, IA 357, OA 3, holding 1:1 returns. Once bit outside casing, slowly bring ECD up to 11.8 at window, 1.44 bpm at 4,120 psi, BHP 4,025 psi, WHP 433, 1.30 bpm rate out, -8 bph losses. 10/30/2016 10/30/2016 2.30 PROD1 WHPST REAM P 7,527 ft. TD rathole. back ream 7,527.0 7,527.0 20:18 22:36 window area, 330R, 30OR and HS, dry drift window, clean, open EDC 10/30/2016 10/31/2016 1.40 PROD1 WHPST TRIP P POOH for drilling BHA maintaining 7,527.0 2,000.0 22:36 00:00 11.8 tripping schedule. 10/31/2016 10/31/2016 0.75 PROD1 WHPST TRIP P POOH for drilling BHA maintaining 2,000.0 74.3 00:00 00:45 11.8 tripping schedule. 10/31/2016 10/31/2016 1.35 PROD1 WHPST PULD P PUD / LD BHA #2 74.3 0.0 00:45 02:06 10/31/2016 10/31/2016 1.60 PROD1 DRILL PULD P PJSM- MU/PD drilling BHA #3, MU to 0.0 72.2 02:06 03:42 CoilTrak, surface test. 10/31/2016 10/31/2016 1.65 PROD1 DRILL TRIP P RIH with BHA #3, 2.3-° AKO motor 72.2 6,950.0 03:42 05:21 and HCC RR 1-1 Bi-center bit, sat down at 4,239 ft (GLM #2 at 4,223 ft) PUW 24k, orientate TF 180°, RIH clean past suspect GLM. 10/31/2016 10/31/2016 0.30 PROD1 DRILL DLOG P Tie in at K1 for minus 4.5 ft correction 6,950.0 6,976.0 05:21 05:39 10/31/2016 10/31/2016 1.00 PROD1 DRILL TRIP P RIH, displacing well to new mud, close 6,976.0 7,527.0 05:39 06:39 EDC, PUW 29 k, continue RIHTB 10/31/2016 10/31/2016 0.85 PROD1 DRILL DRLG P OBD 1.43 bpm at 4,200 psi, BHP 7,527.0 7,533.0 06:39 07:30 4,344, WHP 530, IA 0, OA 6 10/31/2016 10/31/2016 1.75 PROD1 DRILL TRIP T PUH, BHI tools lost power, 7,533.0 74.3 07:30 09:15 troubleshoot from surface, (issue pointing down hole via troubleshooting flowchart. Page 2/37 Report Printed: 12/27/2016 ,. Operations Summary (with Timelog Depths) 1B-18 f Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/31/2016 10/31/2016 2.00 PROM DRILL PULD T PJSM, PUD build section BHA with a 74.3 0.0 09:15 11:15 2.3° bend motor successfully, inspect upper quick and flowsub, 10/31/2016 10/31/2016 1.75 PROD1 DRILL PULD T PD, build section BHA# 4 (pre -loaded) 0.0 72.2 11:15 13:00 Stab INJH, surface test tools (good test) 10/31/2016 10/31/2016 1.55 PROD1 DRILL TRIP T RIH with build section BHA# 4 72.2 6,950.0 13:00 14:33 10/31/2016 10/31/2016 0.25 PROM DRILL DLOG T Log the K1 correction of minus 3.0' 6,950.0 6,972.0 14:33 14:48 *** Note: NPT for failed drilling tools 7.0 hrs. 10/31/2016 10/31/2016 0.50 PROM DRILL TRIP T RIH, PUW above window 29k, Close 6,972.0 7,533.0 14:48 15:18 EDC 10/31/2016 10/31/2016 6.65 PROM DRILL DRLG P OBD 1.45 bpm at 4093 psi, BHP 7,533.0 7,664.0 15:18 21:57 4101, WHP 594, IA 353, OA 7, slow drilling thru Anchorite, getting dirty surveys, not solar or environmental disruption, troubleshoot, suspect DGS. 10/31/2016 11/1/2016 2.05 PROD1 DRILL TRIP T POOH for new BHA 7,664.0 72.2 21:57 00:00 ***Note: NPT for failed drilling tools 2.0 hrs. 11/1/2016 11/1/2016 1.35 PROD1 DRILL PULD T PJSM- PUD BHA #4, bit condition 2-2- 72.2 0.0 00:00 01:21 BT-A-X-I-NO-DTF 11/1/2016 11/1/2016 1.55 PROD1 DRILL PULD T PJSM- MU/PD 3rd build BHA #5, 2.3-° 0.0 72.2 01:21 02:54 AKO motor and RR HCC bit, MU to Coil Trak, surface test. (Sim -Ops) 11/1/2016 11/1/2016 1.55 PROD1 DRILL TRIP T RIH with 3rd build BHA #5 72.2 6,950.0 02:54 04:27 11/1/2016 11/1/2016 0.25 PROM DRILL DLOG T Tie in to K1 for a minus 3.5 ft 6,950.0 6,973.0 04:27 04:42 correction 11/1/2016 11/1/2016 0.30 PROD1 DRILL TRIP T RIH, PUW above window 29k, close 6,973.0 7,520.0 04:42 05:00 EDC, clean thru window. 11/1/2016 11/1/2016 0.25 PROD1 DRILL DLOG T Log RA at 7,509.5 ft, TOWS at 7,502 7,520.0 7,657.0 05:00 05:15 ft. Continue RIH. ***Note: NPT for failed drilling tools 5 h rs. 11/1/2016 11/1/2016 1.50 PROM DRILL DRLG P Stack weight, PUH, dragging minus 7,657.0 7,664.0 05:15 06:45 3.0 k to minus 5.0 k DHWOB, lower pump rate work pipe to bottom, back reaming area from 7,657' up to 7,520' 11/1/2016 11/1/2016 8.25 PROM DRILL DRLG P 7,664 ft. OBD 1.40 bpm at 4,100 psi, 7,664.0 7,855.0 06:45 15:00 BHP 4,138, WHP 539, IA 533, OA 11 11/1/2016 11/1/2016 0.50 PROD1 DRILL TRIP P TD build section (EOB), wiper up hole, 7,855.0 7,816.0 15:00 15:30 seems to be dragging 7,816' 11/1/2016 11/1/2016 2.00 PROD1 DRILL TRIP P Continue wiper up hole, cleaning open 7,816.0 7,060.0 15:30 17:30 hole. Jog tubing tail area. Significant cuttings observed over the shaker at bottoms up. 11/1/2016 11/1/2016 2.50 PROD1 DRILL TRIP P Open EDC, continue POOH. Tag up 7,060.0 66.0 17:30 20:00 1 and space out at surface. Page 3/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/1/2016 11/1/2016 1.00 PROD1 DRILL PULD P PJSM. PUD build BHA #5. Bit graded 66.0 0.0 20:00 21:00 1-1. 11/1/2016 11/1/2016 1.25 PROD1 DRILL PULD P PJSM, PD lateral BHA #6 with 0.5° 0.0 74.0 21:00 22:15 Weatherford motor and RB HYC bit. 11/1/2016 11/2/2016 1.75 PROD1 DRILL TRIP P RIH with BHA #6. Tie in to K1 for a - 74.0 6,984.0 22:15 00:00 3.5 ft correction. 11/2/2016 11/2/2016 0.75 PROD1 DRILL TRIP P Continue running in the hole. Tie in to 6,984.0 7,855.0 00:00 00:45 the K1 for a -3.5 ft correction. Close EDC at the window. PUW = 29KIbs. Continue in the hole to bottom. No issues. 11/2/2016 11/2/2016 3.00 PROD1 DRILL DRLG P BOBD. 1.40 bpm at 4,500 psi, BHP 7,855.0 8,104.0 00:45 03:45 4,145 psi, ROP 20-120 fph. 11/2/2016 11/2/2016 1.75 PROD1 DRILL DRLG P Motor stall at 8104 ft. PU and restart. 8,104.0 8,255.0 03:45 05:30 Stall a second time. PU and restart, continue drilling ahead. PUW 31 Klbs. 11/2/2016 11/2/2016 1.00 PROD1 DRILL WPRT P PUH for wiper trip. PUW = 32, pulled 8,255.0 7,080.0 05:30 06:30 heavy negaitive DHWOB, CTSW = 35 k, work area (clean), continue wiper up hole. 11/2/2016 11/2/2016 0.75 PROD1 DRILL WPRT P Jog/clean the 5" 7,080.0 7,500.0 06:30 07:15 11/2/2016 11/2/2016 0.85 PROD1 DRILL WPRT P Wiper back in hole RIW 10 k 7,500.0 8,255.0 07:15 08:06 11/2/2016 11/2/2016 3.50 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4,397 psi, BHP 8,255.0 8,543.0 08:06 11:36 4125, WHP 352, IA 238, OA 6 11/2/2016 11/2/2016 2.25 PROD1 DRILL WPRT T Unable to retrieve clean survey, 8,543.0 8,543.0 11:36 13:51 Perform DD wiper up hole to 7,997', perform 6 check shots up hole, PUW 32 k, RBIH to bottom, approved to drill another 30' per TE 11/2/2016 11/2/2016 1.00 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4,130 psi, BHP 8,543.0 8,655.0 13:51 14:51 4,142, WHP 352, IA 279, OA 6 11/2/2016 11/2/2016 0.75 PROD1 DRILL WPRT P Wiper up hole 7,550' for a tie in. PUW 8,655.0 7,550.0 14:51 15:36 32 k 11/2/2016 11/2/2016 0.25 PROD1 DRILL DLOG P Log the RA marker correction of plus 7,550.0 7,615.0 15:36 15:51 3.0' 11/2/2016 11/2/2016 0.50 PROD1 DRILL WPRT P Wiper back in hole 7,615.0 8,655.0 15:51 16:21 11/2/2016 11/2/2016 1.00 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4330 psi, BHP 8,655.0 8,667.0 16:21 17:21 4125, WHP 217, IA 219, OA 7 11/2/2016 11/2/2016 1.40 PROD1 DRILL WPRT T DD wiper up hole, PUW 29 k unable to 8,667.0 8,667.0 17:21 18:45 get a clean survey, discuss with town team, approved to drill to 8725 ft (95 ft past last clean survey at 8630 ft.) 11/2/2016 11/2/2016 0.50 PROD1 DRILL DRLG P BOBD 1.5 bpm at 4530 psi, BHP 8,667.0 8,725.0 18:45 19:15 4125, WOB 1.7 Klbs, ROP 90-120 fph. Unable to obtain clean survey. Discuss with town. POOH to reconfigure BHA. 11/2/2016 11/2/2016 1.25 PROD1 DRILL TRIP T POOH with BHA #6. PUW = 30 Klbs. 8,725.0 7,500.0 19:15 20:30 Pulled heavy at 7672 ft, 7665 ft, 7660 ft, 7643 ft and 7611 ft. (-)7KIbs WOB. Worked BHA up into 5" casing. 11/2/2016 11/2/2016 0.75 PROD1 DRILL CIRC P Jog 5" casing. 7,500.0 7,060.0 20:30 21:15 Page 4/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/2/2016 11/3/2016 2.75 PROD1 DRILL TRIP P Continue POOH with BHA#6. Bump 7,060.0 74.0 21:15 00:00 up at surface and space out. Begin PUD BHA #6. 11/3/2016 11/3/2016 0.75 PROD1 DRILL PULD T Finish PUD BHA #6. Bit grade 3-3 74.0 0.0 00:00 00:45 11/3/2016 11/3/2016 0.75 PROD1 DRILL PULD T PD BHA#7 with a 0.5-° AKO motor 0.0 72.0 00:45 01:30 and RR BCC bit. 11/3/2016 11/3/2016 2.00 PROD1 DRILL TRIP T RBIH with BHA #7. Tie in to the K1 for 72.0 7,554.0 01:30 03:30 a -2.5 ft correction. 11/3/2016 11/3/2016 0.50 PROD1 DRILL TRIP T Stacked out at 7554 ft while RIH. 7,554.0 7,554.0 03:30 04:00 PUH. PUW=30 Klbs. Attempt to RBIH. Stack out at 7562 ft. Vary parameters to try and work through build section. 11/3/2016 11/3/2016 1.75 PROD1 DRILL TRIP T Continue RIH, obtaining check shot 7,554.0 8,725.0 04:00 05:45 surveys and resurvey 11/3/2016 11/3/2016 7.75 PROD1 DRILL DRLG T OBD 1.5 bpm at 4,080 psi, BHP 4276, 8,725.0 9,125.0 05:45 13:30 IA 155, OA 7 Mud swap, with new 8.6 ppg flopro mud at the bit at 9067 ft. 11/3/2016 11/3/2016 0.50 PROD1 DRILL WPRT T Wiper up hole PUW 27 k 9,125.0 8,125.0 13:30 14:00 11/3/2016 11/3/2016 0.50 PROD1 DRILL WPRT T Wiper back in hole. RN 8 k 8,125.0 9,125.0 14:00 14:30 11/3/2016 11/3/2016 5.25 PROD1 DRILL DRLG T BOBD 1.5 bpm at 3,913 psi, BHP 9,125.0 9,254.0 14:30 19:45 4,233, WHIP 623, IA 7, OA 10 11/3/2016 11/3/2016 0.25 PROD1 DRILL WPRT T BHA wiper. PUW = 28 Klbs, SOW = 9,254.0 9,254.0 19:45 20:00 11.8 Klbs. 11/3/2016 11/4/2016 4.00 PROD1 DRILL DRLG T BOBD 1.5 bpm at 4100 psi, BHP 9,254.0 9,453.0 20:00 00:00 4,250, W H P 615, IA 7, OA 10 11/4/2016 11/4/2016 2.50 PROD1 DRILL DRLG T Continue crosscutting down through 9,453.0 9,500.0 00:00 02:30 section. 1.5 bpm at 4200 psi, BHP 4,200 Geologist called TD at 9500 feet. Pump TD sweeps. 11/4/2016 11/4/2016 2.75 PROD1 DRILL TRIP T POOH with BHA #7. PUW 29KIbs. 9,500.0 7,070.0 02:30 05:15 11/4/2016 11/4/2016 0.25 PROD1 DRILL WPRT T Jog the 5", pull tight at the tubing tail, 7,070.0 7,215.0 05:15 05:30 RBIH stacked out and stalled motor, jog again 11/4/2016 11/4/2016 2.25 PROD1 DRILL WPRT T Continue wiper to the swab valves. 7,215.0 72.0 05:30 07:45 11/4/2016 11/4/2016 1.75 PROD1 DRILL TRIP T Tag up at surface, reset counters, RIH 72.0 6,950.0 07:45 09:30 11/4/2016 11/4/2016 0.25 PROD1 DRILL DLOG T Log the K1 correction of minus 2.5' 6,950.0 6,975.0 09:30 09:45 11/4/2016 11/4/2016 1.00 PROD1 DRILL WPRT T Continue RIH to the EOB, POOH 6,975.0 7,855.0 09:45 10:45 11/4/2016 11/4/2016 1.25 PROD1 DRILL WPRT T PUH, cleaning build section, perform 7,855.0 7,070.0 10:45 12:00 jog above window, open EDC, jetting the 5" 11/4/2016 11/4/2016 0.25 PROD1 DRILL TRIP T Close EDC, wiper back in hole RIW 15 7,070.0 7,655.0 12:00 12:15 k, pull back up hole log RA. 11/4/2016 11/4/2016 0.25 PROD1 DRILL DLOG T Log the RA for no correction. 7,655.0 7,679.0 12:15 12:30 11/4/2016 11/4/2016 4.00 PROD1 DRILL TRIP T RBIH. Tag up at 9210 ft. Multiple 7,679.0 9,252.0 12:30 16:30 stalls. Work BHA down. Could not get deeper than 9252 ft. Page 5/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKS) 11/4/2016 11/4/2016 1.50 PROM DRILL TRIP T PUH to the window. Pulling heavy in 9,252.0 7,515.0 16:30 18:00 the build section. Work BHA up towards window. Tie in to the RA for a +5 ft correction. 11/4/2016 11/4/2016 0.75 FROM DRILL TRIP T RBIH. Could not work past 9269 ft. 7,515.0 9,269.0 18:00 18:45 11/4/2016 11/4/2016 3.75 PROM DRILL DISP T POOH pumping liner running pill. 9,269.0 72.0 18:45 22:30 Clean trip through build section. Paint window flag at 6472 ft. 11/4/2016 11/4/2016 0.50 PROM DRILL OWFF T Flow check at surface. Static. 72.0 72.0 22:30 23:00 11/4/2016 11/5/2016 1.00 PROM DRILL PULD T PJSM. LD BHA #7. 72.0 0.0 23:00 00:00 11/5/2016 11/5/2016 0.25 PROD1 DRILL DRLG T Finish LD BHA #7. Bit grade 1-2. 0.0 0.0 00:00 00:15 11/5/2016 11/5/2016 0.75 PROD1 DRILL BOPE T Function test BOPE. 0.0 0.0 00:15 01:00 11/5/2016 11/5/2016 4.50 COMPZ1 CASING PUTB T Prep floor to run liner. PU 29 joints 2- 0.0 0.0 01:00 05:30 3/8" slotted liner. PU/MU anchored billet assembly. MU CoilTrak tools. Stab injector. 11/5/2016 11/5/2016 1.50 COMPZI CASING RUNL T Bump up and reset counters. RIH with 0.0 7,369.0 05:30 07:00 liner on CT. 11/5/2016 11/5/2016 0.25 COMPZ1 CASING RUNL T Correct to the EOP flag at 6,400', 7,369.0 7,369.0 07:00 07:15 minus 5.2' 11/5/2016 11/5/2016 1.00 COMPZ1 CASING RUNL T Close EDC, PUW 29 k, continue RIH 7,369.0 8,315.0 07:15 08:15 to bottom 11/5/2016 11/5/2016 1.50 COMPZ1 CASING RUNL T Set down plus 7 k, DHWOB, PUH 8,315.0 8,315.0 08:15 09:45 minus 8 k, discuss with town, pull up to max with out initiating further setting, or damage to tools string. CTSW-45 k, DHWOB-minus 18 k, RBIH to neutral wieght 11/5/2016 11/5/2016 1.00 COMPZ1 CASING RUNL T WOO 8,315.0 8,315.0 09:45 10:45 11/5/2016 11/5/2016 2.00 COMPZ1 CASING TRIP T Bring pump up to shear 3,600 psi, 8,315.0 72.5 10:45 12:45 PUW 28 k, TOB at 7,412'. POOH 11/5/2016 11/5/2016 0.50 COMPZ1 CASING SFTY T Check well for flow, PJSM 72.5 0.0 12:45 13:15 11/5/2016 11/5/2016 0.75 COMPZ1 CASING PULD T LD, liner setting tools, 0.0 0.0 13:15 14:00 11/5/2016 11/5/2016 1.00 PROD1 RPEQPT PULD T Load WS into pipe shed, MU and 0.0 0.0 14:00 15:00 scibe tools, inspect Top Drive 11/5/2016 11/5/2016 1.00 PROD1 RPEQPT PULD T PU/MU/WS BHA# 9 0.0 75.3 15:00 16:00 11/5/2016 11/5/2016 1.50 PROM RPEQPT TRIP T RIH, with WS, pumping min rate 0.3 75.3 6,950.0 16:00 17:30 bpm 11/5/2016 11/5/2016 0.25 FROM RPEQPT DLOG T log the K1 correction of -2.5 ft. 6,950.0 6,983.0 17:30 17:45 11/5/2016 11/5/2016 0.25 PROD1 RPEQPT TRIP T Position WS on depth. PUW = 28 6,983.0 9,405.0 17:45 18:00 Klbs. 11/5/2016 11/5/2016 0.25 FROM RPEQPT WPST T Close EDC. Bring up pumps and set 9,405.0 9,405.0 18:00 18:15 anchors. Set down 5KIbs WOB to confirm set. Top of WS set at 7392 ft, oriented HS. 11/5/2016 11/5/2016 1.25 PROD1 RPEQPT TRIP T POOH with WS running tools. 9,405.0 73.0 18:15 19:30 11/5/2016 11/5/2016 0.50 FROM RPEQPT OWFF T Flow check at surface. Static. 73.0 73.0 19:30 20:00 Page 6137 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/5/2016 11/5/2016 0.75 PROD1 RPEQPT PULD T PJSM, LD BHA#9. 73.0 0.0 20:00 20:45 11/5/2016 11/5/2016 1.25 PROD1 WHPST PULD T PJSM. PU BHA #10 with 0.6° AKO 0.0 75.0 20:45 22:00 motor and HCC DSM. 11/5/2016 11/5/2016 1.50 PROD1 WHPST TRIP T RIH with BHA#10. 75.0 6,950.0 22:00 23:30 11/5/2016 11/5/2016 0.25 PROD1 WHPST DLOG T Tie in to the K1 for a -4 correction 6,950.0 7,000.0 23:30 23:45 11/5/2016 11/6/2016 0.25 PROD1 WHPST TRIP T Continue to RIH with BHA #10. Begin 7,000.0 7,371.0 23:45 00:00 displacing well to drilling fluid. 11/6/2016 11/6/2016 1.25 PROD1 WHPST CIRC T Displace well from completion fluid to 7,371.0 7,371.0 00:00 01:15 FloPro drilling fluid. **Adjust for daylight savings time*** 11/6/2016 11/6/2016 0.25 PROD1 WHPST WPST T RIH and dry tag WS at 7395 ft (TOWS 7,371.0 7,392.0 01:15 01:30 7392 ft). Begin milling window per procedure. 11/6/2016 11/6/2016 7.00 PROD1 WHPST WPST T Begin milling window per procedure. 7,392.0 7,401.0 01:30 08:30 11/6/2016 11/6/2016 1.50 PROD1 WHPST WPST T Continue milling with string reamer @ 7,401.0 7,403.0 08:30 10:00 1.4 fph, 11/6/2016 11/6/2016 4.00 PROD1 WHPST WPST T Drill rathole towards TD 7417', 1.45 7,403.0 7,417.0 10:00 14:00 bpm at 3840 psi, BHP 4023, WHP 403, IA 61, OA 9 11/6/2016 11/6/2016 1.50 PROD1 WHPST WPST T Back Ream window 0°, 30° ROHS, 7,417.0 7,292.0 14:00 15:30 30° LOHS, and 0° 11/6/2016 11/6/2016 0.25 PROD1 WHPST WPST T PUH, and dry drift window area. 7,292.0 7,417.0 15:30 15:45 11/6/2016 11/6/2016 2.00 PROD1 WHPST WPST T POOH, pumping 1.45 bpm at 3,900 7,417.0 70.0 15:45 17:45 psi, BHP 4,029, WHP 417, IA 97, OA 0 11/6/2016 11/6/2016 1.50 PROD1 WHPST PULD T PJSM. PUD BHA #10. Crew change. 70.0 0.0 17:45 19:15 Finish PUD. Mill gauge 2.79" no-go. 11/6/2016 11/6/2016 2.00 PROD1 DRILL PULD T PJSM, PD Build BHA #11 with 1.7° 0.0 74.0 19:15 21:15 AKO motor and HCC bit. 11/6/2016 11/7/2016 2.75 PROD1 DRILL TRIP T Bump up and reset counters. RIH with 74.0 7,437.0 21:15 00:00 BHA #11. Log the K1 for a -3 ft correction. Close EDC. PUW at the window = 37 Klbs. 11/7/2016 11/7/2016 6.75 PROW DRILL DRLG T BOBD. Pumping 1.45 bpm at 4200 7,437.0 7,562.0 00:00 06:45 psi. WOB = 2-3 Klbs. CTW = 12.5 Klbs, BHP = 4140 psi. ROP = 5-80 fph. Some stalls observed while drilling this interval. 11/7/2016 11/7/2016 2.75 PROD1 DRILL TRIP T POOH, perform jog in the 5" with open 7,562.0 72.2 06:45 09:30 EDC 11/7/2016 11/7/2016 1.25 PROD1 DRILL PULD T OOH, PJSM, PUD and LD build 72.2 0.0 09:30 10:45 section BHA# 11 11/7/2016 11/7/2016 1.00 PROD1 DRILL SVRG T Service INJH, change oil in TOP 0.0 0.0 10:45 11:45 Drive. 11/7/2016 11/7/2016 1.25 PROD1 DRILL PULD T PJSM, PD second build section BHA# 0.0 72.2 11:45 13:00 12 with 2.3° motor and RR HCC bi- center bit. 11/7/201611/7/2016 2.00 PROD1 DRILL TRIP T RIH, slowing down 20 fpm pass 72.2 6,950.0 13:00 15:00 1 jewlery. Page 7/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftK6) 11/7/2016 11/7/2016 0.45 PROM DRILL DLOG T Log the K1 marker correction of minus 6,950.0 6,977.0 15:00 15:27 3.0', continue RIH to log RA marker. 11/7/2016 11/7/2016 0.30 PROD1 DRILL DLOG T Log the RA no correction 6,977.0 7,432.0 15:27 15:45 TO W S=7,392.15' BOW= 7,401' RA= 7399.5' 11/7/2016 11/7/2016 0.30 PROM DRILL TRIP T Continue RIH to bottom 7,432.0 7,562.0 15:45 16:03 11/7/2016 11/7/2016 5.25 PROM DRILL DRLG T OBD 1.45 bpm at 4035 psi FS, BHP 7,562.0 7,599.0 16:03 21:18 4108, WHP 380, IA 0, OA 7 11/7/2016 11/7/2016 0.25 PROD1 DRILL WPRT T Wiper up hole PUW 29 k 7,599.0 7,476.0 21:18 21:33 11/7/2016 11/7/2016 0.25 PROD1 DRILL WPRT T Wiper back in hole, RM 15 k 7,476.0 7,599.0 21:33 21:48 11/7/2016 11/8/2016 2.20 PROM DRILL DRLG T BOBD 1.45 bpm at 3950 psi, BHP 7,599.0 7,693.0 21:48 00:00 4141, WHP 437, IA 220, OA 10 11/8/2016 11/8/2016 2.00 PROD1 DRILL DRLG T BOBD 1.45 bpm at 3950 psi, BHP 7,693.0 7,800.0 00:00 02:00 4150, WHP 437, IA 220, OA 10 End of build at 7800 ft. 11/8/2016 11/8/2016 2.00 PROD1 DRILL TRIP T POOH with BHA #12. PUW = 30KIbs. 7,800.0 70.0 02:00 04:00 11/8/2016 11/8/2016 1.50 PROM DRILL PULD T PUD and LD BHA #12. 70.0 0.0 04:00 05:30 11/8/2016 11/8/2016 1.50 PROD1 DRILL PULD T PD BHA#13 with 0.46° AKO motor 0.0 72.0 05:30 07:00 and new HYC bit. 11/8/2016 11/8/2016 2.75 PROM DRILL TRIP T RIH with BHA #13. 72.0 6,950.0 07:00 09:45 11/8/2016 11/8/2016 0.25 PROD1 DRILL DLOG T Log K1 for a -2.5 ft correction. 6,950.0 7,000.0 09:45 10:00 11/8/2016 11/8/2016 0.75 PROD1 DRILL TRIP T Continue running in the hole to 7,000.0 7,800.0 10:00 10:45 bottom. PUW at the window = 27KIbs, Close EDC. Clean trip through window and open hole. 11/8/2016 11/8/2016 10.14 PROD1 DRILL DRLG T BOBD. Pumping 1.4 bpm at 4230 psi. 7,800.0 8,210.0 10:45 20:53 WOB = 1.5KIbs. CTW = 13.5KIbs. BHP = 4190 psi. 11/8/2016 11/8/2016 0.55 PROM DRILL WPRT T Wiper Trip Uphole. PUW = 25k 8,210.0 7,000.0 20:53 21:26 Pumped a 5/5 pill sweep before PUH.. i .............. made several jogs in 5" casing.......... 11/8/2016 11/8/2016 0.27 PROD1 DRILL TRIP T Trip back in hole 7,000.0 7,385.0 21:26 21:42 11/8/2016 11/8/2016 0.30 PROM DRILL DLOG T Log the RA Tag at 7,400' and make a 7,420.0 7,420.0 21:42 22:00 correction of +2' 11/8/2016 11/8/2016 0.45 PROD1 DRILL TRIP T Trip back in hole 7,420.0 8,210.0 22:00 22:27 11/8/2016 11/9/2016 1.54 PROD1 DRILL DRLG T BOBD. Pumping 1.4 bpm at 4251 psi. 8,210.0 8,218.0 22:27 00:00 WOB = 2.25KIbs. CTW = 10.5KIbs. BHP = 4210 psi. ROP = 4.7 to 6.5 fph 11/9/2016 11/9/2016 2.00 PROM DRILL DRLG T OBD. Pumping 1.4 bpm at 4321 psi. 8,218.0 8,236.0 00:00 02:00 WOB = 2.32KIbs. CTW = 11.4KIbs. BHP = 4220 psi. ROP = 4.0 FPH 11/9/2016 11/9/2016 6.50 PROD1 DRILL DRLG T OBD. Pumping 1.4 bpm at 4379 psi. 8,236.0 8,323.0 02:00 08:30 WOB = 1.32KIbs. CTW = 10.8 Klbs. BHP = 4230 psi. ROP = 7.5 to 30 FPH Page 8137 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/9/2016 11/9/2016 0.25 PROD1 DRILL WPRT T Short wiper. PUW = 28k 8,323.0 8,200.0 08:30 08:45 11/9/2016 11/9/2016 0.25 PROD1 DRILL WPRT T RBIH. SOW = 12k 8,200.0 8,323.0 08:45 09:00 Clean trip in and out. 11/9/2016 11/9/2016 9.00 PROD1 DRILL DRLG T OBD. Pumping 1.4 bpm at 4379 psi. 8,323.0 8,426.0 09:00 18:00 WOB = 1.32KIbs. CTW = 10.8 Klbs. BHP = 4230 psi. ROP = 7.5 to 30 FPH 11/9/2016 11/9/2016 3.00 PROD1 DRILL DRLG T OBD. Pumping 1.4 bpm at 4364 psi. 8,426.0 8,503.0 18:00 21:00 WOB = 1.39KIbs. CTW = 13.5 Klbs. BHP = 4254 psi. ROP = 20 to 30 FPH 11/9/2016 11/10/2016 3.00 PROD1 DRILL DRLG T OBD. Pumping 1.4 bpm at 4457 psi. 8,503.0 8,574.0 21:00 00:00 WOB = 2.10KIbs. CTW = 10.5 Klbs. BHP = 4260 psi. ROP = 20 to 44 FPH 11/10/2016 11/10/2016 1.19 PROD1 DRILL DRLG T OBD. Pumping 1.4 bpm at 4257 psi. 8,574.0 8,590.0 00:00 01:11 WOB = 1.63KIbs. CTW = 8.8 Klbs. BHP = 4320 psi. ROP = 07 to 18 FPH Pump a 5 x 5 Hi/Lo Vis Pill prior to beginning wiper trip....... 11/10/2016 11/10/2016 0.38 PROD1 DRILL DRLG T Wiper trip up hole. Initiate a 1,000 ft 8,590.0 7,598.0 01:11 01:34 wiper trip 20 ft earlier than planned due to verylow ROP (<10 fph) PUW = 25K 11/10/2016 11/10/2016 0.48 PROD1 DRILL DRLG T Trip back in hole. RIW = 9.3K 7,598.0 8,590.0 01:34 02:03 11/10/2016 11/10/2016 4.45 PROD1 DRILL DRLG T BOBD. Pumping 1.4 bpm at 4209 psi. 8,590.0 8,630.0 02:03 06:30 WOB = 2.03KIbs. CTW = 9.3 Klbs. BHP = 4282 psi. ROP = 6 to 16 FPH Initiate swapping to a new mud system.... switching from FlowVis to 8.7 ppbPowerPro w/3% KlaStop and 6% KCL New mud at the bit at 8,596' @ 0242 hrs 11/10/2016 11/10/2016 0.25 PROD1 DRILL WPRT T BHA Wiper. PUW = 27 Klbs 8,630.0 8,467.0 06:30 06:45 11/10/2016 11/10/2016 0.25 PROD1 DRILL WPRT T RBIH. SOW 13 Klbs. 8,467.0 8,630.0 06:45 07:00 11/10/2016 11/10/2016 2.25 PROD1 DRILL DRLG T BOBD. Pumping 1.67 bpm at 4300 8,630.0 8,685.0 07:00 09:15 psi. WOB = 1.7KIbs. CTW = 13 Klbs. BHP = 4280 psi. ROP = 10 to 25 FPH 11/10/2016 11/10/2016 2.75 PROD1 DRILL TRIP T Discuss with town. Made decision to 8,685.0 72.0 09:15 12:00 POOH and c/o bit and BHA. POOH. PUW = 26 Klbs. Clean trip out of the hole. 11/10/2016 11/10/2016 1.75 PROD1 DRILL PULD T PJSM. PUD BHA #13. Bit grade 2-2. 72.0 0.0 12:00 13:45 11/10/2016 11/10/2016 1.50 PROD1 DRILL CTOP T Change out UQC. Test e-line. 0.0 0.0 13:45 15:15 11/10/2016 11/10/2016 0.25 PROD1 DRILL CTOP T Change out stripper pack off. 0.0 0.0 15:15 15:30 11/10/2016 11/10/2016 1.68 PROD1 DRILL T PD BHA #14 with 0.5° AJO 0.0 72.0 15:30 17:10 �PULD Weatehrford motor and new HYC bit. Resistivity moved below the DGS. Page 9/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Tme Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/10/2016 11/10/2016 1.88 PROD1 DRILL TRIP T RBIH with open EDC pumping at 72.0 6,959.0 17:10 19:03 minimum rate. SOW = 7.9 K 11/10/2016 11/10/2016 0.36 PROD1 DRILL DLOG T Log for K1 Marker and make 6,959.0 7,000.0 19:03 19:25 correction of + 6.5 FT. Close EDC 11/10/2016 11/10/2016 0.87 PROD1 DRILL TRIP T Resume RIH............. 7,000.0 8,685.0 19:25 20:17 WT CK @ 7,350'= 25K Slow down to 28 fpm while in build section........ 11/10/2016 11/11/2016 3.71 PROD1 DRILL DRLG T BOBD. Pumping 1.28 bpm at 4272 8,685.0 8,853.0 20:17 00:00 psi. WOB = 1.2KIbs. CTW = 12.4 Klbs. BHP = 4180 psi. ROP = 40 to 51 FPH **Perform a BHA wiper trip right before midnight to help clean out hole........ having difficulty getting the bit to turn. 11/11/2016 11/11/2016 1.00 PROD1 DRILL DRLG T BOBD. Pumping 1.28 bpm at 4272 8,853.0 8,886.6 00:00 01:00 psi. WOB = 2.2KIbs. CTW = 12.4 Klbs. BHP = 4180 psi. ROP = 40 to 51 FPH **Perform a BHA wiper trip right before midnight to help clean out hole........ having difficulty getting the bit to turn. Now having to stack considerable WOB to help facilitate turning....... ...... Geo's can work with what we're getting........... 11/11/2016 11/11/2016 0.94 PROD1 DRILL WPRT T PUH slowly and confer with town 8,886.6 8,540.0 01:00 01:56 engineer and town GEO........... having difficulty getting the bit to turn up with trying numerous options ......... not getting sufficent enough turn to facilitate making our next target which is critical. Waiting for town to decide on course of action, so still PUH slowly............ PUW = 27.31K 11/11/2016 11/11/2016 0.20 PROD1 DRILL TRIP T Recieved word from town engineer to 8,540.0 8,886.0 01:56 02:08 proceed forward and "aggressively try and make next target at 6,645". Start RBIH SOW = 11.5 11/11/2016 11/11/2016 2.86 PROD1 DRILL DRLG T BOBD. Pumping 1.18 bpm at 4072 8,886.0 8,986.0 02:08 05:00 psi. WOB = 3.1KIbs. CTW = -1.2 Klbs. BHP = 4140 psi. ROP = 40 to 54 FPH 11/11/2016 11/11/2016 4.00 PROD1 DRILL DRLG T OBD. Pumping 1.14 bpm at 3962 psi. 8,986.0 9,080.0 05:00 09:00 WOB = 2.3KIbs. CTW = -3.5 Klbs. BHP = 4299 psi. ROP = 40 fph 11/11/2016 11/11/2016 1.50 PROD1 DRILL DRLG T OBD. Pumping 1.14 bpm at 3962 psi. 9,080.0 9,098.0 09:00 10:30 WOB = 2.3KIbs. CTW = -3.5 Klbs. BHP = 4300 psi. ROP decreasing to <5fph. Multiple pick ups and restarts to try and improve ROP. Page 10/37 Report Printed: 12/27/2016 E- ;- Operations Summary (with Timelog Depths) IB -18 „y Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/11/2016 11/11/2016 3.00 PROD1 DRILL TRIP T After discussion with town. Decision 9,098.0 68.0 10:30 13:30 made to POOH. PUW = 29 Klbs. Jog 5" window area. Open EDC. Continue out of the hole. 11/11/2016 11/11/2016 2.00 PROD1 DRILL PULD T PJSM. PUD BHA#14. 68.0 0.0 13:30 15:30 11/11/2016 11/11/2016 2.25 PROD1 STK PULD T PJSM. PD BHA #15, Anchored billet 0.0 72.0 15:30 17:45 assembly. 11/11/2016 11/11/2016 1.82 PROD1 STK TRIP T RIH with Anchored Billet 72.0 6,959.0 17:45 19:34 Assembly ............ 11/11/2016 11/11/2016 0.22 PROD1 STK DLOG T Logging for K1 Marker and make 6,959.0 7,086.0 19:34 19:47 correction of - 3 ft correction. 11/11/2016 11/11/2016 0.17 PROD1 STK TRIP T Continue RIH with Anchored Billett 7,086.0 7,350.0 19:47 19:57 11/11/2016 11/11/2016 0.06 PROD1 STK TRIP T Stop here. Offline with pump. Close 7,350.0 7,350.0 19:57 20:01 EDC. WT CK = 27k 11/11/2016 11/11/2016 0.20 PROD1 STK TRIP T Continue RIH with Anchored Billett 7,350.0 7,480.0 20:01 20:13 11/11/2016 11/11/2016 0.68 PROD1 STK TRIP T Starting to get some noticable weight 7,480.0 7,480.0 20:13 20:54 bobbles after 7,456 ft. and eventually setting down too much weight at 7,480 ft. Tried jogging through area and other different options, but ultimately could not get past 7,480 ft. Did not want to get western with the billet due to proximity to the window and distance from target set depth. Confer with town engineer and he agreed we should POOH and do a clean up run. Once OOH, we will do the BOP Test before the clean up run. 11/11/2016 11/11/2016 0.90 PROD1 STK TRIP T Start to POOH and dragging too much 7,480.0 7,383.0 20:54 21:48 weight ......... hopefully the dogs are not sticking out........... work the billet up and down slowly and are eventually able to start POOH albeit slowly....... 11/11/2016 11/11/2016 0.12 PROD1 STK TRIP T Stop here to open EDC and bring 7,383.0 7,383.0 21:48 21:55 pump online at .75 bpm......... 11/11/2016 11/12/2016 2.09 PROD1 STK TRIP T Resume POOH pumping at .75 bpm, 7,383.0 72.3 21:55 00:00 CP = 2,442 PUW = 28k WHP = 841 BHP = 3,805 11/12/2016 11/12/2016 1.75 PROD1 STK PULD T At surface. PUD and LD BHA #15. 68.2 0.0 00:00 01:45 11/12/2016 11/12/2016 1.50 PROD1 STK PULD T Pull floats, MU nozzle. Stab on 0.0 0.0 01:45 03:15 lubricator. Flush stack. 11/12/2016 11/12/2016 0.75 PROD1 STK BOPE T Pressure test inner reel valve and 0.0 0.0 03:15 04:00 pack off. 11/12/2016 11/12/2016 2.00 PROD1 STK SVRG T Change out bales on TD. Grease 0.0 0.0 04:00 06:00 stack and choke manifold. Change out 4 foot riser. 11/12/2016 11/12/2016 10.50 PROD1 STK BOPE T Perform BOP Test after PJSM and 0.0 06:00 16:30 after tree is serviced, stack flushed out, coil displaced with water. Restest master after greasing. 11/12/2016 11/12/2016 2.27 PROD1 STK BOPE T BOP Test complete. P/U BHA #16 0.0 62.3 16:30 18:46 1 1 1 1w/2.80" Ridge Set Mill 11/12/2016 11/12/2016 2.00 PROD1 STK PULD T Pressure Deploy BHA #16 62.3 62.3 18:46 20:46 Page 11/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/12/2016 11/12/2016 1.93 PROD1 STK TRIP T RIH pumping at .5 bpm with open 62.3 6,943.0 20:46 22:42 EDC First 5 x 5 Gel sweep pumped...... 11/12/2016 11/12/2016 0.40 PROD1 STK DLOG T Log for K1 Marker and make 6,943.0 6,974.0 22:42 23:06 correction of -2 ft 11/12/2016 11/12/2016 0.08 PROD1 STK TRIP T Continue RIH for clean out run 6,972.0 7,522.0 23:06 23:10 Second 5 x 5 gel pill launched Close EDC at 7,380 ft............ Reciprocate pipe through 5" to clean area while first pill is exiting coil...... First sweep back to shakers brought cuttings to surface. 11/12/2016 11/13/2016 0.82 PROD1 STK REAM T Hit hard tag at 7,522 ft. Reciprocate 7,522.0 7,546.0 23:10 00:00 pipe through this area trying to break through...... pass 7,522 ft only to tag up at 7,533 ft...............PUH and RBIH...............pump third sweep ............ getting about 2 feet deeper with each bite ............ very slow going ............. PUWs are between 25 and 35k 11/13/2016 11/13/2016 1.82 PROD1 STK REAM T Still cleaning cuttings out of build 7,546.0 8,561.0 00:00 01:49 section by taking 50' bites after breaking through last fill tag at 7,548 ft. 11/13/2016 11/13/2016 1.13 PROD1 STK REAM T Tag something at 8,565.0 ft. 8,561.0 8,589.0 01:49 02:57 Slowly work past this depth and continue RIH to 8,589 ft and unable to go any further. PUW exceeded 50k and - 15k on WOB............ ID of hole seems to have swollen...... doesn't act like fill. Confer with town engineer or setting billet higher than 8,650 ft. Waiting on return call with plan forward. 11/13/2016 11/13/2016 3.05 PROD1 STK TRIP T Engineer called back and said billet 8,589.0 62.0 02:57 06:00 would be set higher, but currently has not decided on a depth yet. Continue POOH chasing returns to surface as planned (pumping sweeps, jogging through 5" and again at surface). Begin POOH. PUW = 27K Make several jogs through 5............. 11/13/2016 11/13/2016 1.75 PROD1 STK PULD T PUD and LD BHA #16. Packed clay 62.0 0.0 06:00 07:45 and cuttings observed in the mill junk slot area. 11/13/2016 11/13/2016 1.75 PROD1 STK PULD T PJSM. PD BHA #17, anchored billet 0.0 72.0 07:45 09:30 assembly. 11/13/2016 11/13/2016 1.75 PROD1 STK TRIP T RIH with BHA #17. 72.0 6,960.0 09:30 11:15 11/13/2016 11/13/2016 0.25 PROD1 STK DLOG T Log K1 for a -1.5 ft correction. 6,960.0 6,985.0 11:15 11:30 11/13/2016 11/13/2016 1.00 PROD1 STK TRIP T Continue RIH with anchored billet. 6,985.0 8,462.0 11:30 12:30 Weight check at the window = 28KIbs PUW. Page 12/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (W[3) End Depth (ftKB) 11/13/2016 11/13/2016 0.25 PROD1 STK WPST T Position billet on depth (TOB = 8450 8,462.0 8,462.0 12:30 12:45 ft, oriented 25° LOHS). Bring pump up. Setting tool sheared at 4600 psi. Set 5klbs down and confirmed set. 11/13/2016 11/13/2016 1.25 PROD1 STK TRIP T POOH with BHA #17. 8,462.0 72.0 12:45 14:00 11/13/2016 11/13/2016 1.80 PROD1 STK PULD T PJSM. PUD BHA#17. 72.0 0.0 14:00 15:48 11/13/2016 11/13/2016 1.35 PROD1 DRILL PULD T PJSM, PD BHA #18 with 0.85° AKO 0.0 72.0 15:48 17:09 motor and RB HCC bit. 11/13/2016 11/13/2016 1.68 PROD1 DRILL TRIP T RIH with EDC open pumping minimum 72.0 6,952.0 17:09 18:49 rate 11/13/2016 11/13/2016 0.21 PROD1 DRILL DLOG T Log for K1 Marker and make 6,952.0 6,980.0 18:49 19:02 correction of -2 ft 11/13/2016 11/13/2016 0.88 PROD1 DRILL TRIP T Resume RIH pumping at minimum 6,980.0 8,450.2 19:02 19:55 rate ....... RIW = 14.5K 11/13/2016 11/13/2016 1.97 PROD1 DRILL KOST T Tag top of billet ........... PUH and 8,450.2 8,450.2 19:55 21:53 perform a 100' wiper trip to ensure clean BHA......... RBI and lightly set down on top of billet to begin milling ........... having major wieght transfer issues ........... 7 stalls so far........... still trying different tactics ........... too much friction and too many stalls.......... 11/13/2016 11/13/2016 0.35 PROD1 DRILL WPRT T Perform a wiper trip to the window and 8,450.2 7,444.0 21:53 22:14 mix a lube pill to pump so as to be back on bottom when pill comes out 11/13/2016 11/13/2016 0.40 PROD1 DRILL TRIP T RBIH 7,444.0 8,449.2 22:14 22:38 11/13/2016 11/14/2016 1.36 PROD1 STK KOST T BOBM. Still having weight transfer 8,449.2 8,449.2 22:38 00:00 issues and trying different tactics such as different pump rates, backreaming passes, wiper trips, different speeds, changing tool face, etc. with no luck. Still getting stalls. Have tried pumping a 20 bbl lube pill which seems to be helping somewhat....... 11/14/2016 11/14/2016 3.58 PROD1 STK KOST T Continuing to try and kick off billet at 8,449.2 8,449.2 00:00 03:34 8,450 ft. Still working with lube pill and trying different tactics. Have tried backreaming, moving the tool face orietation, different pump rates, speeds and tried 3 different drillers. Having weight transfer issues. Have now pumped beads to help with weight transfer... .............. Page 13/37 Report Printed: 1212712016 Operations Summary (with Timelog Depths) kik ax 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 11/14/2016 11/14/2016 3.92 PROD1 STK KOST T After the first 7 bbls of beads are out, 8,449.2 8,457.0 03:34 07:30 we start to get some weight transfer.............able to gently tag billet and start milling.............starting to lose weight again.............PUH for a short wiper and RBIH and try again ........... impossible to get weight transfer without beads .......... continue drilling, but periodically lose WOB ....... Multiple pick ups and restarts. Rate = 1.41 bpm, Circ Press = 3,541, WHIP = 608, IA = 38, OA = 07, CTW = 13.9K, WOB = .08 to .46 k 11/14/2016 11/14/2016 2.50 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.5 8,457.0 8,508.0 07:30 10:00 bpm at 4000 psi. BHP = 4280 psi, WOB = 0.5-0.8KIbs ROP 10-30 fph. 11/14/2016 11/14/2016 0.25 PROD1 DRILL WPRT T PUH and dry drift kick off area. PUW = 8,508.0 8,450.0 10:00 10:15 26KIbs. Dry drift clean. 11/14/2016 11/14/2016 3.25 PROD1 DRILL WPRT T Continue to PUH into 5" casing and 8,450.0 7,050.0 10:15 13:30 jog area. Choke B plugging up with cuttings and aluminum. Clean and clear both Choke B and choke A. Significant amount of aluminum observed over the shakers. 11/14/2016 11/14/2016 1.00 PROD1 DRILL WPRT T RBIH. Clean trip through window and 7,050.0 8,508.0 13:30 14:30 open hole. 11/14/2016 11/14/2016 1.00 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.45 8,508.0 8,574.0 14:30 15:30 bpm at 4300 psi. BHP = 4290 psi, WOB = 1.0KIbs ROP 50-80 fph. 11/14/2016 11/14/2016 0.25 PROD1 DRILL WPRT T PUH for short wiper to 8500, PUW = 8,574.0 8,574.0 15:30 15:45 27KIbs. 11/14/2016 11/14/2016 2.00 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.6 8,574.0 8,810.0 15:45 17:45 bpm at 4300 psi. BHP = 4290 psi, WOB = 1.9KIbs ROP 20-50 fph. 11/14/2016 11/14/2016 2.75 PROD1 DRILL WPRT T PUH for planned wiper trip. PUW = 8,810.0 7,808.0 17:45 20:30 27KIbs 11/14/2016 11/14/2016 0.50 PROD1 DRILL WPRT T RBIH. SOW 11 Klbs. 7,808.0 8,809.0 20:30 21:00 11/14/2016 11/15/2016 3.00 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.6 8,809.0 8,910.0 21:00 00:00 bpm at 4300 psi. BHP = 4290 psi, WOB = 1.9KIbs ROP 20-50 fph. 11/15/2016 11/15/2016 5.10 PROD1 DRILL DRLG T Continue drilling ahead. Pumping 1.6 8,910.0 9,110.0 00:00 05:06 bpm at 4289 psi. BHP = 4320 psi, WOB = 1.8KIbs ROP 20-80 fph. Launch 5 x 5 Sweep pill prior to PUH for wiper trip 11/15/2016 11/15/2016 1.77 PROD1 DRILL WPRT T Perform wiper trip to 5" TT and 9,110.0 7,069.0 05:06 06:52 perform several jogs in 5 " casing 11/15/2016 11/15/2016 1.22 PROD1 DRILL TRIP T Trip back in hole 7,069.0 9,110.0 06:52 08:05 11/15/2016 11/15/2016 5.98 PROD1 DRILL DRLG T BOB drilling ahead. Pumping 1.5 bpm 9,110.0 9,374.8 08:05 14:04 at 4272 psi. BHP = 4294 psi, WOB = 1.2KIbs ROP 20-80 fph. Page 14/37 Report Printed: 12/27/2016 F. Operations Summary (with Timelog Depths) IB -18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 11/15/2016 11/15/2016 0.65 PROD1 DRILL WPRT T Perform 1,000 ft wiper trip a little 9,374.8 8,360.0 14:04 14:43 earlier than planned due to losing push ability..............pumped a sweep pill..................pill brought back sticky clay and some shale ............... 11/15/2016 11/15/2016 0.66 PROD1 DRILL WPRT T Trip back in hole 8,360.0 9,374.8 14:43 15:22 "Note: Town engineer called and would like us to keep an eye on two hot spots and make note in WSR if any issue noticed ........ 8,950 ft and 9,163 ft. Notified the day driller Greg also. 11/15/2016 11/15/2016 5.62 PROD1 DRILL DRLG T BOB drilling ahead. Pumping 1.65 9,374.9 9,469.0 15:22 21:00 bpm at 4172 psi. BHP = 4344 psi, WOB = 1.0KIbs ROP 20-30 fph. Swapping to new mud system (#4) at 9,389 ft. Around 1,500 ft on System #3 with .8% DS. 11/15/2016 11/15/2016 2.00 PROD1 DRILL DRLG T OBD 1.65 bpm at 3,993 psi FS, BHP 9,469.0 9,500.0 21:00 23:00 4,355 psi, CWT -7k, WOB .9k, ROP 7, weight transfer issue, high gama sinse 9,340 ft, confer with town, pumped 25 bbl Drill Zone pill, little help, make up and pump staggered beaded pills. 11/15/2016 11/16/2016 1.00 PROW DRILL DRLG P 9,500 ft OBD 1.65 bpm at 3,993 psi 9,500.0 9,516.0 23:00 00:00 FS, BHP 4,367 psi, WOB .8, ROP 20- 30 " Note: off trouble time 11/16/2016 11/16/2016 4.60 PROD1 DRILL DRLG P OBD 1.65 bpm at 3,993 psi FS, BHP 9,516.0 9,582.0 00:00 04:36 4,368 psi, CWT -4.5k, WOB .8k, continue staggered beaded pill sweeps, several restarts, BHA wipers, PUW's consistant 28k to 29k, pump 5x5 sweep 11/16/2016 11/16/2016 1.25 PROD1 DRILL WPRT P Early wiper to window, PUW 29k, 9,582.0 7,069.0 04:36 05:51 Make several jogs in 5........... 11/16/2016 11/16/2016 0.25 PROD1 DRILL WPRT P Wiper back in hole 7,069.0 7,410.0 05:51 06:06 11/16/2016 11/16/2016 0.20 PROD1 DRILL DLOG P Log for RA Tag and make correction 7,410.0 7,428.0 06:06 06:18 of + 5 ft. 11/16/2016 11/16/2016 1.20 PROD1 DRILL WPRT P Continue RBIH 7,428.0 8,889.0 06:18 07:30 11/16/2016 11/16/2016 1.30 PROD1 DRILL WPRT P Having to work through tight spot from 8,889.0 8,956.0 07:30 08:48 8,889 to 8,946 ft..............changing tool face and pump rates seemed to help. Appeared to be more hole geometry and swollen clays than cuttings until we hit 8,946 ft where it looks like we have a bed of cuttings ............ had a 12k overpull here....... town called and said to work down throough area and work back up cleaning up this tight spot Page 15/37 Report Printed: 12/27/2016 r Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftK6) End Depth (ftKB) 11/16/2016 11/16/2016 0.70 PROD1 DRILL WPRT P Town called back and said since we 8,956.0 9,582.0 08:48 09:30 made it through this tight area to head to bottom and continue drilling until they call back ............ heading to bottom 11/16/2016 11/16/2016 8.50 PROD1 DRILL DRLG P BOBD 1.60 bpm at 4,027 psi FS, BHP 9,582.0 9,701.0 09:30 18:00 4,325 psi, CWT -3.5k, WOB .5k, continue staggered beaded pill sweeps, several restarts, BHA wipers, PUW's consistant 29k to 30k. Avg ROP = 14 fph 11/16/2016 11/17/2016 6.00 PROD1 DRILL DRLG P OBD 1.6 bpm at 4,190 psi FS, BHP 9,701.0 9,819.0 18:00 00:00 4,268 psi, CWT -9.8k, WOB .51k, ROP 18, continue beaded pills, PUW's 26k to 28k, added 1 % LoTorc lube to system, seeing better CWT .0k, WOB 1.1k to 1.5k, ROP 19 11/17/2016 11/17/2016 4.00 PROD1 DRILL DRLG P Continue drilling ahead 1.6 bpm at 9,819.0 9,980.0 00:00 04:00 4,450 psi FS, BHP 4,370 psi, CWT.0k, WOB 1 A k 11/17/2016 11/17/2016 0.40 PROD1 DRILL WPRT P Wiper trip up hole 900 ft, PUW 26k 9,982.0 9,082.0 04:00 04:24 11/17/2016 11/17/2016 0.55 PROM DRILL WPRT P Wiper trip back in hole, slow speed to 9,082.0 9,982.0 04:24 04:57 30 fpm at .8 bpm to work past 9,465 ft to 9,485 ft, continue in hole. 11/17/2016 11/17/2016 14.95 PROD1 DRILL DRLG P BOBD 1.61 bpm at 4,417 psi FS, BHP 9,982.0 10,200.0 04:57 19:54 4,306 psi, CWT 3k, WOB .7k, ROP 10 to 30 11/17/2016 11/17/2016 1.20 PROM DRILL CIRC P 10,200 ft. TD called, reciprocate pipe, 10,200.0 10,200.0 19:54 21:06 PUW 26k while pumping last of beaded pill, build Hi/Lo vis sweeps, pump 1 0x1 0 Lo/Hi sweep. 11/17/2016 11/17/2016 1.80 PROM DRILL WPRT P Chase sweeps to window, PUW 25k, 10,200.0 7,070.0 21:06 22:54 slow thru window 6 fpm at ,5 bpm. 11/17/2016 11/17/2016 0.95 PROD1 DRILL WPRT P Jet/jog 5" 7,370 ft to 7,070 ft 2 times, 7,070.0 7,370.0 22:54 23:51 wait for heavy returns to clean up over shaker, pump 10x10. 11/17/2016 11/18/2016 0.15 PROM DRILL WPRT P RBIH to 7,575 ft. 7,370.0 7,575.0 23:51 00:00 11/18/2016 11/18/2016 2.85 PROM DRILL WPRT P Continue RIH from 7,575 ft to 8,005 ft, 7,575.0 72.2 00:00 02:51 chase 1 0x1 0 sweeps to 5" and Jet/jog 5" 7,370 ft to 7,070 ft 2 times, wait for returns to clean up, continue wiper to swab, 200 ft jog at surface. 11/18/2016 11/18/2016 1.90 PROD1 DRILL TRIP P Bump up, reset counters, RBIH to 72.2 6,940.0 02:51 04:45 confirm TD, DS pillow block overheating, slow RIH speed to troubleshoot. 11/18/2016 11/18/2016 0.20 PROD1 DRILL DLOG P Tie in to K1 for minus 1.5 ft correction. 6,940.0 6,978.0 04:45 04:57 Pump 1 0x1 0 sweep 11/18/2016 11/18/2016 0.72 PROM DRILL TRIP P Continue RIH to EOB 6,978.0 7,896.0 04:57 05:40 11/18/2016 11/18/2016 0.92 PROD1 DRILL WPRT P At EOB.chase sweep to window and 7,896.0 7,086.0 05:40 06:35 make several jogs in 5" Page 16/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) �A Y IB -18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (MB) 11/18/2016 11/18/2016 1.33 PROD1 DRILL TRIP P RBIH to confirm TD 7,086.0 10,200.0 06:35 07:55 At 9,009' we tagged up, PUH reduce pump rate to .5 and went through area without a weight bobble................no other issues seen to TD depth. PUWs were are all in normal range .....26k until we got to 10,180' and then we had a 12k overpull............ looks like TD is at 10,200.0 11/18/2016 11/18/2016 0.35 PROD1 DRILL TRIP P On bottom and just started pumping 10,200.0 10,130.0 07:55 08:16 the liner running pill and waiting for pill to reach bit ............... 11/18/2016 11/18/2016 2.97 PROD1 DRILL TRIP P POOH laying in beaded liner pill to 10,130.0 92.0 08:16 11:14 surface and completion fluid (11.8 ppg). 50 fpm and PUW = 25K Paint flags at 8,372 ft and at 5,572 ft. 11/18/2016 11/18/2016 0.64 FROM DRILL OWFF P At surface. Perform Flow Check. 92.0 92.0 11:14 11:52 Hold PJSM for laying down BHA #18. Passing Flow Check 11/18/2016 11/18/2016 0.85 PROD1 DRILL PULD P L/D BHA#18 92.0 0.0 11:52 12:43 1 11/18/2016 11/18/2016 1.45 COMPZ1 CASING EQRP P Swap out bails after PJSM. 0.0 0.0 12:43 14:10 11/18/2016 11/18/2016 2.60 COMPZ1 CASING PUTB P Start making up 55 joints 2 3/8" 0.0 11694.0 14:10 16:46 Slotted Liner Note: Well Flowing BOP Drill performed. 11/18/2016 11/18/2016 1.45 COMPZ1 CASING PULD P MUAL1 liner assembly to BHA#19, 1,694.0 1,738.2 16:46 18:13 MU to CoilTrak, surface test 11/18/2016 11/18/2016 2.00 COMPZ1 CASING RUNL P RIH with BHA #19, Tie in at flag for 1,738.2 8,519.0 18:13 20:13 minus 7 ft correction, PUW 28k, RBIH, clean thru window and build section. 11/18/2016 11/19/2016 3.77 COMPZ1 CASING RUNL P Start stacking, begin working liner 8,519.0 10,092.0 20:13 00:00 assembly down, breakover 35k, broke free from 9,450 ft to 10,020 ft, work liner hard, confer with town. 11/19/2016 11/19/2016 0.25 COMPZ1 CASING RUNL P Continue working liner, unable to get 10,092.0 8,398.0 00:00 00:15 deeper than 10,092 ft, confer with town, PUW 38k, WOB -4.8k. Release off liner assembly at 1.2 bpm, PUW 32k, WOB -0.5k. reset counters. TOL 8,398 ft. 11/19/2016 11/19/2016 1.95 COMPZ1 CASING TRIP P POOH pumping across the top. 8,398.0 44.2 00:15 02:12 11/19/2016 11/19/2016 0.55 COMPZ1 CASING OWFF P On surface, flow check, good. PJSM- 44.2 44.2 02:12 02:45 LD BHA over dead well. 11/19/2016 11/19/2016 0.75 COMPZ1 CASING PULD P LD BHA #19. 44.2 0.0 02:45 03:30 11/19/2016 11/19/2016 0.50 COMPZ1 CASING BOPE P PJSM- Function test BOPE. 0.0 0.0 03:30 04:00 11/19/2016 11/19/2016 1.00 COMPZ1 CASING PULD P PJSM- MU OH Anchored billet to BHA 0.0 73.0 04:00 05:00 #20, MU to CoilTrak, surface test, DPS malfuntioning, unstab to change out CoilTrak tools. Page 17/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/19/2016 11/19/2016 0.93 COMPZ1 CASING PULD T Swap CoilTrak tools. 73.0 73.0 05:00 05:55 11/19/2016 11/19/2016 2.50 COMPZI CASING RUNL P RIH with BHA #20, EDC open. 73.0 6,956.0 05:55 08:25 11/19/2016 11/19/2016 0.29 COMPZI CASING DLOG P Log for K1 Marker and make 6,956.0 6,982.0 08:25 08:43 correction of minus 1.5 ft 11/19/2016 11/19/2016 0.16 COMPZI CASING RUNL P Continue RIH with anchored billet 6,982.0 7,374.0 08:43 08:52 11/19/2016 11/19/2016 0.15 COMPZ1 CASING RUNL P Stop here and close EDC and perform 7,374.0 7,374.0 08:52 09:01 a weight check.............WT CK = 26k 11/19/2016 11/19/2016 0.50 COMPZI CASING RUNL P Continue RIH with anchored billet 7,374.0 7,418.0 09:01 09:31 11/19/2016 11/19/2016 0.64 COMPZ1 CASING RUNL T Tag hard at 7,918 ft with 7,918.0 7,918.0 09:31 10:10 billet .......... set down 3k and could not get string weight back. Tried PUH 50 ft and RBIH with no luck...............tried several other options to no avail. Last PUW was at 32k ......... Confer with town engineer and decision made to POOH and put on a 1.5 degree motor and 2.80" Ridge Set Mill and clean out the hole and tag TOL to determine exact depth. 11/19/2016 11/19/2016 1.84 COMPZ1 CASING TRIP T POOH with anchored billet after 7,918.0 80.6 10:10 12:00 opening EDC and bringing pumps online at .7 bpm 11/19/2016 11/19/2016 0.68 COMPZ1 CASING OWFF T At surface. Perform flow check. 80.6 80.6 12:00 12:41 11/19/2016 11/19/2016 0.40 COMPZ1 CASING PULD T L/D BHA #20 BHA came back with 80.6 0.0 12:41 13:05 some sticky clay -like substance on it.............. 11/19/2016 11/19/2016 0.50 COMPZ1 CASING PULD T P/U BHA #21 w/1.5 degree motor and 0.0 67.3 13:05 13:35 2.80" Ridge Set Mill 11/19/2016 11/19/2016 1.20 COMPZI CASING TRIP T RIH with EDC open pumping at .5 67.3 6,953.0 13:35 14:47 bpm 11/19/2016 11/19/2016 0.26 COMPZ1 CASING DLOG T Log for K1 Marker and make 6,953.0 6,972.0 14:47 15:03 correction of minus 1.5 ft 11/19/2016 11/19/2016 0.12 COMPZ1 CASING TRIP T Continue RIH 6,792.0 7,297.0 15:03 15:10 11/19/2016 11/19/2016 0.09 COMPZI CASING TRIP T Stop here and close EDC and perform 7,297.0 7,297.0 15:10 15:15 a weight check.............WT CK = 28k 11/19/2016 11/19/2016 0.31 COMPZ1 CASING TRIP T Continue RIH 7,297.0 7,918.0 15:15 15:34 11/19/2016 11/19/2016 0.43 COMPZ1 CASING REAM T Have passed where we were hung up 7,918.0 8,399.0 15:34 16:00 with the billet earlier ........... saw only the slightest weight bobble..............continuing creeping in hole at 20 fpm..... offline with pump and continue RIH to dry tag TOL at 8,399 ft .................... 11/19/2016 11/19/2016 0.85 COMPZ1 CASING DISP T PUH slowly and bring pump online to 8,399.0 8,380.0 16:00 16:51 displace KWF with 8.8 Power -Pro before pumping sweeps and cleaning hole........... Page 18137 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) W` 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/19/2016 11/19/2016 2.65 COMPZ1 CASING REAM T Start PUH now that KW IF has been 8,380.0 7,370.0 16:51 19:30 displace and begin hole cleaning operations, work area 7,955 ft to 7,840 ft, pump 5x5, RBIH, chase sweep to window, pump 2nd 5x5, jet/jog F- 7,370 ft to 7,070 ft, wait for sweeps to come over shaker. 11/19/2016 11/19/2016 1.60 COMPZ1 CASING TRIP T POOH, 200 ft jog at surface. PJSM- 7,370.0 62.3 19:30 21:06 PUD BHA 11/19/2016 11/19/2016 1.85 COMPZ1 CASING PULD T On surafce, Attempt to PUD, unable to 62.3 62.3 21:06 22:57 bleed down, lower checks not holding, PJSM- scope change, close Annular and EDC, open bleed to pump, WHP drops 1,170 psi to 800 psi, troubleshoot, upper checks not holding also, confer with town, PD BHA#21 and RIH to kill well. 11/19/2016 11/19/2016 0.65 COMPZ1 CASING TRIP T RBI with BHA#21, EDC open, 62.3 62.3 22:57 23:36 attempt flush upper floats 1.7 bpm while RIH, decided to stop at 350 ft, shut in well, bleed off to pumps, upper QC's holding, POOH 11/19/2016 11/20/2016 0.40 COMPZ1 CASING PULD T Bump up, space out, bleed back 62.3 62.3 23:36 00:00 pump, upper checks holding, PJSM- PUD BHA #21 under 1st contingency, close Annular, EDC closed. Note: BHI 3.5 hrs down time. 11/20/2016 11/20/2016 3.35 COMPZ1 CASING PULD T PUD BHA#21, close Annular, EDC 62.3 0.0 00:00 03:21 closed. LD mill and motor, LD upper half, check connection torques, open EDC, load PDL and MU anchored billet. 11/20/2016 11/20/2016 1.50 COMPZ1 CASING PULD T PJSM- PD OH Anchored billet BHA 0.0 72.9 03:21 04:51 #22, replace UQC floats, MU to CoilTrak, surface test. 11/20/2016 11/20/2016 1.66 COMPZ1 CASING TRIP T RIH with OH Anchored Billet (Shears 72.9 6,954.0 04:51 06:30 screws checked, pinned heavy, 16,960#, 23-28k shear) 11/20/2016 11/20/2016 0.20 COMPZ1 CASING DLOG T Log for K1 Marker and make 6,954.0 6,980.0 06:30 06:42 correction of minus 1.0 ft. 11/20/2016 11/20/2016 0.15 COMPZ1 CASING TRIP T Continue RIH with Anchored Billet with 6,980.0 7,372.0 06:42 06:51 open EDC pumping at minimum rate 11/20/2016 11/20/2016 0.55 COMPZ1 CASING TRIP T Continue RIH with anchored 7,372.0 8,399.0 06:51 07:24 billet ....................... Note; Passed the problem area around 7,918 ft with only a slight weight bobble.................smooth sailing down to TOL....... 11/20/2016 11/20/2016 0.28 COMPZ1 CASING TRIP P Tag TOL with billet at 8,399 ft ...... set 8,399.0 8,387.2 07:24 07:41 down 3k ............ PUH to 24 k ........ bring pump online and pump off of billet ........... TOB at 8,387.25 ft, 150 degrees ROHS 11/20/2016 11/20/2016 1.80 COM Zi CASING TRIP P POOH pumping at 1.2 bpm ............. 8,387.2 67.8 07:41 09:29 11/20/2016 11/20/2016 0.80 COMPZ1 CASING PULD P At surface. Pressure Undeploy BHA 67.8 67.8 09:29 10:17 #22 after PJSM. Page 19/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Time Log Start Time End Time our (hr) Phase 11/20/2016 11/20/2016 0.40 COMPZI C 10:17 10:41 Continue RIH ;e B, Locking 11/20/2016 11/20/2016 0.55 PROD2 S 10:41 11:14 6,954.0 6,997.0 11/20/2016 11/20/2016 0.85 PROD2 S 11:14 12:05 CTW = 24K WOB =.54 K 11/20/2016 11/20/2016 1.10 PROD2 F 12:05 13:11 11/20/2016 11/20/2016 1.33 PROD2 S 13:11 14:31 11/20/2016 11/20/2016 0.18 PROD2 S 14:31 14:42 11/20/2016 11/20/2016 0.14 PROD2 S 14:42 14:50 11/20/2016 11/20/2016 0.15 PROD2 S 14:50 14:59 wipers, beads, varying speeds, rates 11/20/2016 11/20/2016 0.30 PROD2 S 14:59 15:17 11/20/2016 11/20/2016 1.50 PROD2 S 15:17 16:47 Code Activity Code Time P -T -X I Operation G PULD P Lay down BHA #22 PULD P P/U BHA #23 w/ AKO .8 HCC 2.7 X 3.0" bit PULD P Pressure Deploy BHA #: JT SVRG P Service Rica ------- Servic Rotate Top Drive, Change out Job: DRILLING SIDETRACK perform Pin hose on ram. P RIH with open EDC pumping at 67.8 bpm P Log for K1 Marker and make 72.1 correction of minus 1.5 ft P Continue RIH ;e B, Locking 72.1 P Stop here and close EDC and Job: DRILLING SIDETRACK perform Start Depth (WEI) End Depth (WB) PROD2 67.8 0.0 x and 0.0 72.1 8,387.0 72.1 72.1 ;e B, Locking 72.1 72.1 .5 72.1 6,954.0 6,954.0 6,997.0 6,997.0 7,381.0 7,381.0 7,381.0 a weight check..WT CK = 26k Continue RIH to billet Tag TOB at 8,387.64 ft ......... PUH and start creeping back in hole.............1.5 bpm CP = 3,797 WHP = 510 BHP =4,272 CTW = 13.87 K WOB = .34 K X87.0 11/20/2016 11/21/2016 7.21 PROD2 STK KOST P OBD... ... 1.59 bpm Circ Press = 8,387.0 8,387.0 16:47 00:00 4,084 WHP = 510 BHP = 4,252 CTW = 24K WOB =.54 K Having some weight transfer issues...... have pumped a Hi -Lo Vis pill and a beaded pill to help........ BHA wipers, beads, varying speeds, rates and trenching, engauged at 8,386.6 ft, aluminum across shaker. 11/21/2016 11/21/2016 3.15 PROD2 STK KOST P Kick off billet using beads, frequent 8,387.0 8,395.0 00:00 03:09 stalls due to stick slipping after starting, 1.53 bpm at 3,800 psi FS, BHP 4,250 psi, WHIP 495, IA 134, OA 0 11/21/2016 11/21/2016 0.50 PROD2 DRILL DRLG P OBD 1.55 bpm at 3,800 psi FS, BHP 8,395.0 8,430.0 03:09 03:39 4,257 psi, CWT 13.8k, W0130.8k, ROP 53 11/21/2016 11/21/2016 0.25 PROD2 DRILL WPRT P Wiper up hole above billet to 8,300 ft, 8,430.0 8,430.0 03:39 03:54 PUW 26k, RBIH, dry drift billet area clean. 11/21/2016 11/21/2016 6.80 PROD2 DRILL DRLG P BOBD 1.61 bpm at 3,998 psi FS, BHP 8,430.0 8,750.0 03:54 10:42 4,268 psi, CWT 11.8k, WOB 1.0k, ROP 40 to 80 fph Report ' Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (MB) 11/21/2016 11/21/2016 1.45 PROD2 DRILL WPRT P Once 5 x 5 sweep is out of bit, PUH 8,750.0 8,750.0 10:42 12:09 for a wiper trip to the 5".............make several jogs in 5............ Town is also looking at the DLS data to determine if we need to POOH and change to a lesser degree motor.............doglegs are coming in at 16 degrees instead of 12 degrees ............... Jeff calls back and town has decided to keep what we have on for now.................DLS is trending downward .............. 11/21/2016 11/21/2016 7.53 PROD2 DRILL DRLG P BOBD 1.63 bpm at 4,359 psi FS, BHP 8,750.0 9,008.0 12:09 19:40 4,323 psi, CWT 10.8k, WOB 1.0k, ROP 20 to 40 fph Note: The two dog legs right before 1730hrs were both 16.4 and 18 degrees.......... 11/21/2016 11/21/2016 2.00 PROD2 DRILL WPRT P At 9,008 ft and having weight transfer 9,008.0 9,008.0 19:40 21:40 issues ... ......... current mud system has around 1,400 ft and .8 DS ...... will try and do a 1,000 ft wiper trip to see if that helps before doing a mud swap......... wiper trip did not help......... start pumping a beaded pill............ 11/21/2016 11/22/2016 2.32 PROD2 DRILL DRLG P BOBD 1.53 bpm at 4,357 psi FS, BHP 9,008.0 9,101.0 21:40 00:00 4,337 psi, CWT 6.3k, WOB 1.4k, ROP 20 to 50 fph Note: We got weight transfer back before the beaded pill exited the no=le..............still on System #4 11/22/2016 11/22/2016 8.50 PROD2 DRILL DRLG P OBD 1.5 bpm at 3,981 psi FS, BHP 9,101.0 9,410.0 00:00 08:30 4,292 psi, CWT -0.7k, WOB 2.0k, ROP 30, WHP 478, IA 440, OA 0 Note: Mud swap with new mud out bit at 9,242 ft. 11/22/2016 11/22/2016 2.00 PROD2 DRILL WPRT P Wiper trip to window, PUW 25k, hole 9,410.0 7,070.0 08:30 10:30 loading up, 200 ft jog at EOB, Pulling heavy thru build from 7,820 ft, clean thru window, Jet/Jog 5", wait for shaker to clean up, RBIH 11/22/2016 11/22/2016 0.15 PROD2 DRILL DLOG P Log RA for a plus 4.0 ft correction. 7,070.0 7,429.0 10:30 10:39 11/22/2016 11/22/2016 0.75 PROD2 DRILL WPRT P Wiper back in hole, clean thru build 7,429.0 9,410.0 10:39 11:24 and hole appears clean. 11/22/2016 11/22/2016 1.30 PROD2 DRILL DRLG P BOBD 1.52 bpm at 4,055 psi FS, BHP 9,410.0 9,432.0 11:24 12:42 4,348 psi, CWT 6k, WOB 1.1 k, ROP 80. Lost all returns at 9,424 ft, PUW 28k, RBIH, restart 1.52 bpm at 4,055 FS, BHP 4,338 psi, CWT 6k, WOB 1.1k, ROP 99, healing starting at 9,445 ft. Page 21/37 Report Printed: 12/27/2016 Y Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/22/2016 11/22/2016 5.50 PROD2 DRILL DRLG P OBD 1.52 bpm at 4,055 psi FS, BHP 9,432.0 9,561.0 12:42 18:12 4,338 psi, CWT -8k, WOB 1.4k, ROP 3, hit Anchorite, slow drilling 11/22/2016 11/22/2016 1.30 PROD2 DRILL DRLG P OBD 1.52 bpm at 4055 psi FS, BHP 9,561.0 9,629.0 18:12 19:30 4331, WHP 375, IA 367, OA 0 11/22/2016 11/22/2016 0.25 PROD2 DRILL WPRT P 200' wiper up hole, PUW 9,629.0 9,429.0 19:30 19:45 11/22/2016 11/22/2016 0.25 PROD2 DRILL WPRT P Wiper back in hole, RIW 5 k 9,429.0 9,629.0 19:45 20:00 11/22/2016 11/23/2016 4.00 PROD2 DRILL DRLG P BOBD 1.52 bpm at 4055 psi FS, BHP 9,629.0 9,779.0 20:00 00:00 4350, WHP 373, IA 368, OA 6 11/23/2016 11/23/2016 0.75 PROD2 DRILL DRLG P OBD 1.52 bpm at 4055 psi FS, BHP 9,779.0 9,810.0 00:00 00:45 4431, WHP 375, IA 368, OA 6 11/23/2016 11/23/2016 0.35 PROD2 DRILL WPRT P Wiper up hole 1000', PUW 28 k 9,810.0 8,800.0 00:45 01:06 11/23/2016 11/23/2016 0.50 PROD2 DRILL WPRT P Wiper back in hole, RIW 9 k 8,800.0 9,810.0 01:06 01:36 11/23/2016 11/23/2016 7.95 PROD2 DRILL DRLG P BOBD 1.52 bpm at 3860 psi FS, BHP 9,810.0 9,989.0 01:36 09:33 4326, WHP 359, IA 375, OA 0 11/23/2016 11/23/2016 2.00 PROD2 DRILL WPRT P Wiper trip to window, PUW 27k, hole 9,989.0 7,070.0 09:33 11:33 loading up, 200 ft jog at EOB, Pulling heavy 31 k thru build from 7,820 ft, clean thru window, Jet/Jog 5", wait for shaker to clean up, RBIH 11/23/2016 11/23/2016 0.25 PROD2 DRILL DLOG P Log RA for a plus 4.5 ft correction. 7,070.0 7,430.0 11:33 11:48 11/23/2016 11/23/2016 0.95 PROD2 DRILL WPRT P Wiper back in hole, clean thru build, 7,430.0 9,989.0 11:48 12:45 past billet and hole appears clean RIW . 11/23/2016 11/23/2016 5.25 PROD2 DRILL DRLG P BOBD 1.55 bpm at 4,100 psi FS, BHP 9,989.0 10,106.0 12:45 18:00 4,366 psi, CWT -3.7k, WOB, 1.2k, WHP 373, IA 400, OA 0, BHA wiper at 9,949' 11/23/2016 11/24/2016 6.00 PROD2 DRILL DRLG P Continue drilling ahead 1.52 bpm at 10,106.0 10,246.0 18:00 00:00 4,100 FS, BHP 4384, WHP 344, IA 461, OA 0, BHA wiper at 10,120', 10,165', 10,192', pumping beaded pills 11/24/2016 11/24/2016 3.25 PROD2 DRILL DRLG P Continue drilling ahead on bottom, 1.4 10,246.0 10,299.0 00:00 03:15 bpm at 4200 psi, BHP 4371, WHP 366, IA 466, OA 0 11/24/2016 11/24/2016 0.50 PROD2 DRILL WPRT P 1000' Wiper up hole PUW 25 k 10,299.0 9,300.0 03:15 03:45 11/24/2016 11/24/2016 0.35 PROD2 DRILL WPRT P Wiper back in hole. RIW 2 k 9,300.0 10,299.0 03:45 04:06 11/24/2016 11/24/2016 12.25 PROD2 DRILL DRLG P BOBD 1.4 bpm at 3921 psi FS, BHP 10,299.0 10,688.0 04:06 16:21 4374, WHP 370, IA 436, OA 0, lots of pick ups and beads, PUW's 25k to 27k and clean. pump 10x10 11/24/2016 11/24/2016 2.50 PROD2 DRILL WPRT P Wiper trip to window, PUW 25k, pull 10,688.0 7,410.0 16:21 18:51 up thru window jog the 5 inch up to 7,410' 11/24/2016 11/24/2016 0.25 PROD2 DRILL DLOG P RIH , log the RA marker correction of 7,410.0 7,430.0 18:51 19:06 plus 5.5' 11/24/2016 11/24/2016 1.25 PROD2 DRILL WPRT P Wiper back in hole RIW 1.5 k 7,430.0 10,688.0 19:06 20:21 11/24/2016 11/25/2016 3.65 PROD2 DRILL DRLG P BOBD 1.35 bpm at 4060 psi FS, BHP 10,688.0 10,770.0 20:21 00:00 4470, WHP 408, IA 372, OA 0 Page 22/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) ter;. �. 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/25/2016 11/25/2016 9.95 PROD2 DRILL DRLG P OBD 1.35 bpm at 4,060 psi FS, BHP 10,770.0 10,900.0 00:00 09:57 4395, WHP 363, IA 367, OA 0, Lo-vis sweeps folowed by lots of beads and numerous pick ups, PUW's 28k to 31 k, pumped last of beaded pill, MU Hi-vis sweep 11/25/2016 11/25/2016 0.75 PROD2 DRILL CIRC P TD called, reciprocate pipe, PUW 28k 10,900.0 10,900.0 09:57 10:42 while pumping last of beaded pill, build Hi/Lo vis sweeps, pump 1 0x1 0 Lo/Hi sweep. 11/25/2016 11/25/2016 2.10 PROD2 DRILL WPRT P Chase sweeps to window, PUW 28k, 10,900.0 7,070.0 10:42 12:48 Jog at EOB, slow thru window 6 fpm at 0.5 bpm. 11/25/2016 11/25/2016 1.15 PROD2 DRILL WPRT P Jet/jog 5" from 7,370 ft to 7,070 ft 2 7,070.0 7,370.0 12:48 13:57 times, wait for returns to clean up over shaker, pump 10x10. 11/25/2016 11/25/2016 0.55 PROD2 DRILL WPRT P RBIH to 8,250 ft. 7,370.0 8,250.0 13:57 14:30 11/25/2016 11/25/2016 2.40 PROD2 DRILL WPRT P Chase 1 0x1 0 sweeps to 5" and Jet/jog 8,250.0 72.2 14:30 16:54 5" fromm 7,370 ft to 7,070 ft, wait for returns to clean up, continue wiper to swab, 250 ft jog at surface. 11/25/2016 11/25/2016 1.60 PROD2 DRILL TRIP P Bump up, reset counters, RBIH to 72.2 6,940.0 16:54 18:30 confirm TD 11/25/2016 11/25/2016 0.25 PROD2 DRILL DLOG P Tie in to K1 for minus 1.0 ft correction. 6,940.0 6,980.0 18:30 18:45 Pump 1 0x1 0 sweep, jogged the build section, jetted the 5 inch, 11/25/2016 11/25/2016 2.50 PROD2 DRILL TRIP P Continue RIH, bobble at 10299', TF 6,980.0 10,900.0 18:45 21:15 stops rotated, PUH, RBIH clean with drilled TF, confirmed TD 10,900'. 11/25/2016 11/26/2016 2.75 PROD2 DRILL DISP P POOH laying in12.0 ppg liner running 10,900.0 4,167.0 21:15 00:00 pill with beads, painting EOP flags at 9,800' and 6,200' 11/26/2016 11/26/2016 1.00 PROD2 DRILL TRIP P Continue POOH 4,167.0 72.1 00:00 01:00 11/26/2016 11/26/2016 0.75 PROD2 DRILL OWFF P PJSM, check well for flow 72.1 72.1 01:00 01:45 11/26/2016 11/26/2016 1.00 PROD2 DRILL PULD P LD drilling BHA# 23 72.1 0.0 01:45 02:45 11/26/2016 11/26/2016 0.30 COMPZ2 CASING PUTB P Prep rig floor to run liner. 0.0 0.0 02:45 03:03 11/26/2016 11/26/2016 0.25 COMPZ2 CASING SFTY P PJSM, to MU lower AL3-01 liner 0.0 0.0 03:03 03:18 section ** Note: Bit grade 8-6-LM-NX-1-BT- TD, pictures are on the s:drive 11/26/2016 11/26/2016 2.95 COMPZ2 CASING PUTB P MU Ported bullnose, 32 jts of slotted 0.0 1,044.7 03:18 06:15 liner and shorty to BHA #24, change out checks, surface test. 11/26/2016 11/26/2016 2.00 COMPZ2 CASING RUNL P RIH with AL3-01 lower liner assembly, 1,044.7 8,450.0 06:15 08:15 minus 6.0 ft at flag, continue RIH. Page 23/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/26/2016 11/26/2016 3.00 COMPZ2 CASING RUNL T Stacking 8,450 ft to 8,500 ft, PUW 8,450.0 9,910.0 08:15 11:15 30k, continue RIH, stacking at 9,800 ft, attempt to work down, loosing ground to 9,669 ft, pump .4 bpm, work to 9,775 ft, PU 225 ft, RIH 55 fpm to 9,910 ft, PUW 35k, loosing ground getting back to 9,900 ft, PUH, RBIH to 9,906 ft, unable to work deeper, loosing ground to 9,880 ft, confer with town. 11/26/2016 11/26/2016 2.50 COMPZ2 CASING TRIP T POOH for BOPE test and plan 9,910.0 1,044.7 11:15 13:45 forward, PUW 36k. 11/26/2016 11/26/2016 0.50 COMPZ2 CASING OWFF T On surface, monitor well for flow, 1,044.7 1,044.7 13:45 14:15 PJSM- LD BHA over dead well. 11/26/2016 11/26/2016 0.75 COMPZ2 CASING PULD T LD BHA #24, prep floors. 1,044.7 1,000.2 14:15 15:00 11/26/2016 11/26/2016 3.00 COMPZ2 CASING PULL T PJSM- LD shorty, 32 jts slotted and 1,000.2 0.0 15:00 18:00 bullnose. 11/26/2016 11/26/2016 2.00 COMPZ2 CASING CTOP T Flush surface lines and displace coil to 0.0 0.0 18:00 20:00 fresh water, grease choke manifold 11/26/2016 11/26/2016 3.25 COMPZ2 WHDBOP BOPE P Start BOP testing, test witness waived 0.0 0.0 20:00 23:15 per state tester Lou Grimadli, 3,500 psi high/250 psi low/2,500 annular preventor. Stab INJH test inner reel valve, stripper 11/27/2016 11/27/2016 5.00 COMPZ2 WHDBOP BOPE T Continue BOP testing, test witness 0.0 0.0 00:00 05:00 waived per state tester Lou Grimaldi, 3,500 psi high/250 psi low/2,500 annular preventor flowing BOP check list. 11/27/2016 11/27/2016 3.00 COMPZ2 CASING CTOP T RD test equipment, flush surface lines 0.0 0.0 05:00 08:00 and displace coil to 12.0 ppg completion fluid, grease choke manifold and stack 11/27/2016 11/27/2016 1.35 COMPZ2 CASING PULD T PJSM, MU Cleanout BHA #25 with a 0.0 62.4 08:00 09:21 0.8° ako motor and D331 GEB, 2.79" no/go, MU to CoilTrak, surface test. 11/27/2016 11/27/2016 1.40 COMPZ2 CASING TRIP T RIH with clean out BHA #25 62.4 6,940.0 09:21 10:45 11/27/2016 11/27/2016 0.20 COMPZ2 CASING DLOG T Tie in to K1 for minus 1.5 ft correction. 6,940.0 6,973.0 10:45 10:57 11/27/2016 11/27/2016 1.65 COMPZ2 CASING TRIP T Continue RIH, close EDC, PUW 6,973.0 10,900.0 10:57 12:36 above window 27k, clean thru build, some drag just past billet, clean past 9,910 ft, (15k CWT) confirm TD again at 10,900 ft (10k CWT) 11/27/2016 11/27/2016 0.25 COMPZ2 CASING SFTY T Confirm TD again at 10,900 ft (10k 10,900.0 10,900.0 12:36 12:51 CWT) confer with town, change of scope, will not clean out, pump new bedaded completion fluid to surface. PJSM- change of scope. 11/27/2016 11/27/2016 5.50 COMPZ2 CASING CIRC T Reciprocate pipe, PUW 29k, while 10,900.0 10,900.0 12:51 18:21 making up 100 bbl of 12.0 ppg beaded liner pill, 2ppb beads, 3% Safe Lube, and pumping to mill, pulled 34.5k at 9,905 11/27/2016 11/27/2016 3.00 COMPZ2 CASING TRIP T Discuss plan forward, POOH from 10,900.0 62.4 18:21 21:21 10,570' displacing wellbore to beads, beads to surface, continue POOH pumping pipe displacement. Page 24/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) r1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/27/2016 11/27/2016 0.50 COMPZ2 CASING OWFF T Tag up at surface, PJSM, check well 62.4 62.4 21:21 21:51 for flow 11/27/2016 11/27/2016 0.65 COMPZ2 CASING PULD T LD Cleanout BHA 62.4 0.0 21:51 22:30 11/27/2016 11/27/2016 0.50 COMPZ2 CASING SFTY T Tools OOH, Prep to MU liner 0.0 0.0 22:30 23:00 assembly 11/27/2016 11/27/2016 0.75 COMPZ2 CASING PUTB T MU 16 joints of slotted liner 0.0 505.6 23:00 23:45 11/27/2016 11/28/2016 0.25 COMPZ2 CASING PULD T PU/MU BHI Coiltrak tools, w/ agitator 505.6 505.6 23:45 00:00 11/28/2016 11/28/2016 1.00 COMPZ2 CASING PULD T Continue MU Coiltrak tools, surface 505.6 557.1 00:00 01:00 test 11/28/2016 11/28/2016 1.50 COMPZ2 CASING RUNL T RIH, with AL3 -01 liner running BHA# 557.1 7,364.0 01:00 02:30 26 with agitator 11/28/2016 11/28/2016 0.25 COMPZ2 CASING RUNL T Correct to the 6,700' EOP flag, 7,364.0 7,450.0 02:30 02:45 continue IH 11/28/2016 11/28/2016 0.25 COMPZ2 CASING DLOG T Log the K1 correction of plus 5.0' 7,450.0 7,450.0 02:45 03:00 11/28/2016 11/28/2016 0.55 COMPZ2 CASING RUNL T Continue RIH to bottom, no pumps, 35 7,450.0 9,110.0 03:00 03:33 fpm, BHP 4 450 psi, annular increasing 11/28/2016 11/28/2016 1.30 COMPZ2 CASING RUNL P Continue RIH to bottom (off trouble 9,110.0 10,900.0 03:33 04:51 time) on depth at 10,900 ft, release off liner at 1.1 bpm at 5,000 psi BHA, PUW 25k, liner appears to be off, reset depths. 11/28/2016 11/28/2016 3.65 COMPZ2 CASING TRIP P POOH, paint flags at 8,000 ft and 10,393.0 50.3 04:51 08:30 5,000 ft 11/28/2016 11/28/2016 0.50 COMPZ2 CASING OWFF P On surface, monitor well for flow. 50.3 50.3 08:30 09:00 PJSM- LD BHA over dead well 11/28/2016 11/28/2016 0.75 COMPZ2 CASING PULD P LD BHA#26, remove agitator from 50.3 0.0 09:00 09:45 BHA, lower liner in hole. 11/28/2016 11/28/2016 0.50 COMPZ2 CASING RURD P Prep floors for liner run. 0.0 0.0 09:45 10:15 11/28/2016 11/28/2016 1.40 COMPZ2 CASING PUTB P PJSM- MU ported bullnose, 38 jts 0.0 1,191.9 10:15 11:39 slotted, Shorty. 11/28/2016 11/28/2016 0.85 COMPZ2 CASING PULD P PJSM- MU lower liner assemblyto 1,191.9 1,236.1 11:39 12:30 CoilTrak tools, surface test. 11/28/2016 11/28/2016 3.10 COMPZ2 CASING RUNL P RIH with 1,192 ft AL3 -01 lower middle 1,236.1 8,130.0 12:30 15:36 liner BHA #27, correct to flag minus 3.5 ft, continue RIH, PUW 25k at 7,000 ft. continue RIH 11/28/2016 11/28/2016 0.15 COMPZ2 CASING DLOG P Log K1 for plus 1.5 ft, 8,130.0 8,160.0 15:36 15:45 11/28/2016 11/28/2016 0.95 COMPZ2 CASING RUNL P Continue RIH, 35 fpm at -350 psi over 8,160.0 10,145.0 15:45 16:42 BHP, pumps off. 11/28/2016 11/28/2016 0.65 COMPZ2 CASING RUNL P Stacking at 10,145 ft, PUW 30k, work 10,145.0 10,392.0 16:42 17:21 liner to 10,392 ft, PUW 30k, release off liner at 1.1 bpm at 4,711 psi, BHP 4,882 psi, 775 psi Diff. PUW 22k. reset counters. 11/28/2016 11/28/2016 3.15 COMPZ2 CASING TRIP P POOH pumping beaded completion 9,200.0 44.2 17:21 20:30 fluid paint EOP flags at 8,000 ft and 6,200 ft. 11/28/2016 11/28/2016 0.50 COMPZ2 CASING OWFF P On surface, monitor well for flow. 44.2 44.2 20:30 21:00 PJSM- LD BHA over dead well 11/28/2016 11/28/2016 0.50 COMPZ2 CASING PULD P LD BHA 427 44.2 0.0 21:00 21:30 Page 25/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1 B-18 .��<: Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/28/2016 11/28/2016 0.25 COMPZ2 CASING RURD P Prep floors for liner run 0.0 0.0 21:30 21:45 11/28/2016 11/28/2016 1.50 COMPZ2 CASING PUTB P PJSM- MU ported bullnose, 35 jts 0.0 1,090.3 21:45 23:15 slotted, 10 ft solid pup jt and Shorty. 11/28/2016 11/29/2016 0.75 COMPZ2 CASING PULD P PJSM- MU number 3 liner assembly to 1,090.3 1,134.5 23:15 00:00 BHA #28, MU to CoilTrak tools 11/29/2016 11/29/2016 0.25 COMPZ2 CASING PULD P continue to MU number 3 liner 1,134.5 1,134.5 00:00 00:15 assembly to CoilTrak tools, surface test. 11/29/2016 11/29/2016 2.00 COMPZ2 CASING RUNL P RIH with 1,092 ft AL3 -01 middle liner 1,134.5 7,334.5 00:15 02:15 BHA #27 11/29/2016 11/29/2016 0.25 COMPZ2 CASING RUNL P Correct to the EOP flag, continue IH 7,334.5 8,762.0 02:15 02:30 11/29/2016 11/29/2016 1.00 COMPZ2 CASING RUNL P Set down minus 10 k CTSW, minus 8,762.0 9,201.0 02:30 03:30 1.9 k DHWOB, PUW 28 k, RBIH, at 45 fpm, 11/29/2016 11/29/2016 2.00 COMPZ2 CASING TRIP P Remove liner length from BHA, POOH 9,201.0 55.1 03:30 05:30 11/29/2016 11/29/2016 0.50 COMPZ2 CASING PULD P Check well for flow, PJSM for laying 55.1 55.1 05:30 06:00 down settting BHA 11/29/2016 11/29/2016 1.00 COMPZ2 CASING PULD P LD BHA# 28, liner setting tools 55.1 0.0 06:00 07:00 11/29/2016 11/29/2016 0.75 COMPZ2 CASING PULD P PU/MU OH anchored billet 0.0 0.0 07:00 07:45 11/29/2016 11/29/2016 0.50 COMPZ2 CASING PULD P Discuss with town team concerns of 0.0 0.0 07:45 08:15 current fluid in hole, w/ running an OH Anchored Billet. 11/29/2016 11/29/2016 1.25 COMPZ2 CASING PULD P PJSM, LD billet, MU cleanout BHA 0.0 62.4 08:15 09:30 with a D331. 11/29/2016 11/29/2016 3.00 COMPZ2 CASING TRIP P Tag up, reset counters, surface test 62.4 6,947.0 09:30 12:30 BHI Coiltrak tools. RIH, slowly keeping annular below 350 psi over pressure schedule, switching to 8.8 ppg drilling fluid, at .15 bpm, BHP 4,600 psi 11/29/2016 11/29/2016 0.25 COMPZ2 CASING DLOG P log the K1 correction of minus 2.0' 6,947.0 6,970.0 12:30 12:45 11/29/2016 11/29/2016 1.25 COMPZ2 CASING TRIP P Continue RIH 6,970.0 8,090.0 12:45 14:00 11/29/2016 11/29/2016 5.50 COMPZ2 CASING DISP P Jog from 8,090'to 7,150', increasing 8,090.0 8,090.0 14:00 19:30 pump rate to 0.4 bpm, BHP 4,590 psi displacing well to 8.8 ppg used flopro. 11/29/2016 11/29/2016 2.00 COMPZ2 CASING TRIP P POOH, jogging before build and inside 8,090.0 500.0 19:30 21:30 5". Chase sweep out of the hole. 11/29/2016 11/29/2016 0.50 COMPZ2 CASING TRIP P Open EDC, continue POOH. Tag up 500.0 56.0 21:30 22:00 and space out. 11/29/2016 11/29/2016 1.25 COMPZ2 CASING PULD P PUD BHA#29. 56.0 0.0 22:00 23:15 11/29/2016 11/29/2016 0.25 COMPZ2 CASING PULD P PU and PD BHA #30, anchored billet 0.0 0.0 23:15 23:30 assembly. 11/30/2016 11/30/2016 1.00 COMPZ2 CASING PULD P Continue to PD BHA #30. Anchored 0.0 72.0 00:00 01:00 billet assembly. 11/30/2016 11/30/2016 1.75 COMPZ2 CASING TRIP P RIH with anchored billet. SOW = 72.0 6,950.0 01:00 02:45 15KIbs 11/30/2016 11/30/2016 0.25 COMPZ2 CASING DLOG P Log the K1 for a -2 ft correction. 6,950.0 61982.0 02:45 03:00 Page 26/37 Report Printed: 12/27/2016 v Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (WS) 11/30/2016 11/30/2016 0.75 COMPZ2 CASING TRIP P Close EDC at the window. Continue 6,982.0 8,105.0 03:00 03:45 running in the hole with BHA #30. Tag up at 8105 ft. PU and repeat tag at 8105 ft. Bring up pump and set billet at 4700 psi, anchor oriented low side. Top of billet at 8,094 ft. 11/30/2016 11/30/2016 2.25 COMPZ2 CASING TRIP P POOH with BHA#30. 8,105.0 61.0 03:45 06:00 11/30/2016 11/30/2016 2.00 COMPZ2 CASING PULD P PJSM, PUD, BHA# 30 61.0 0.0 06:00 08:00 11/30/2016 11/30/2016 3.00 PRODS DRILL SVRG P Install MM parts, simops repair 0.0 0.0 08:00 11:00 hydraulic seal in cellar. 11/30/2016 11/30/2016 1.50 PROD3 DRILL PULD P PJSM, PD kickoff/drilling BHA 0.0 72.1 11:00 12:30 11/30/2016 11/30/2016 1.50 PRODS DRILL TRIP P RIH w/ AL3 kickoff/drilling BHA# 31, 72.1 6,947.0 12:30 14:00 0.8 ako motor and RB HYC bi-center bit 11/30/2016 11/30/2016 0.25 PRODS DRILL DLOG P Log the K1 marker correction minus 6,947.0 6,957.0 14:00 14:15 1.5' 11/30/2016 11/30/2016 0.25 PRODS DRILL TRIP P Continue RIH to bottom 6,957.0 8,094.0 14:15 14:30 11/30/2016 11/30/2016 5.50 PRODS STK KOST P Dry tag TOB at 8093.8', PUW 28 k 8,094.0 8,115.0 14:30 20:00 Begin milling billet. Stacking CT weight. Pump beads to assist kicking off. Drill off billet to 8115f PUH, clean dry drift through billet area. 11/30/2016 12/1/2016 4.00 PRODS DRILL DRLG P Continue drilling ahead, pumping 1.5 8,115.0 8,320.0 20:00 00:00 BPM, at 3860 psi. BHP = 4200 psi, WHP = 498 psi. WOB 1.5-2 Klbs, ROP = 20-70 FPH. 12/1/2016 12/1/2016 3.25 PRODS DRILL DRLG P Continue drilling ahead, pumping 1.5 8,320.0 8,490.0 00:00 03:15 BPM, at 3900 psi. BHP = 4200 psi, WHP = 498 psi. WOB 1.5-2 Klbs, ROP = 20-70 FPH. 12/1/2016 12/1/2016 0.25 PRODS DRILL WPRT P PUH for planned wiper trip. PUW = 8,490.0 8,110.0 03:15 03:30 26KIbs. 12/1/2016 12/1/2016 0.25 PRODS DRILL WPRT P RBIH. SOW = 13.5 Klbs 8,110.0 8,490.0 03:30 03:45 12/1/2016 12/1/2016 5.00 PRODS DRILL DRLG P BOBD, 1.4 bpm at 3,598 psi, BHP 8,490.0 8,805.0 03:45 08:45 4283, WHP 644 12/1/2016 12/1/2016 1.50 PROD3 DRILL WPRT P Wiper up hole, PUW 25 k, jog the 5 8,805.0 7,393.0 08:45 10:15 inch 12/1/2016 12/1/2016 0.25 PRODS DRILL DLOG P RBIH, log the RA marker correction of 7,393.0 7,431.0 10:15 10:30 plus 3.0'. 12/1/2016 12/1/2016 0.75 PRODS DRILL WPRT P Wiper back in hole, RIW 11 k 7,431.0 8,805.0 10:30 11:15 12/1/2016 12/1/2016 6.75 PRODS DRILL DRLG P BOBD, 1.53 bpm at 3,712 psi, BHP 8,805.0 9,045.0 11:15 18:00 4,396, WHP 663, IA 200, OA 0 12/1/2016 12/2/2016 6.00 PRODS DRILL DRLG P Continue drilling ahead pumping 1.55 9,045.0 9,164.0 18:00 00:00 BPM at 4250 psi. BHP 4310 psi. IA 252, OA 0. Beginning to have weight transfer issues. Prepare pill pit for beaded pills. Page 27/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) fi 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/2/2016 12/2/2016 5.00 PROD3 DRILL DRLG P Continue drilling ahead pumping 1.55 9,164.0 9,245.0 00:00 05:00 BPM at 4150 psi. BHP 4430 psi. IA 265, OA 0. Beginning to have weight transfer issues. Begin pumping alternating 201bbl beaded pills, followed by 20bbi mud from the active. BHA wipers as required to maintain weight transfer. 12/2/2016 12/2/2016 1.25 PROD3 DRILL WPRT P Wiper up hole into the 5 inch. PUW 25 9,245.0 7,393.0 05:00 06:15 12/2/2016 12/2/2016 0.25 PROD3 DRILL WPRT P RIH, to log RA 7,393.0 7,404.0 06:15 06:30 12/2/2016 12/2/2016 0.25 PROD3 DRILL DLOG P Log the RA marker correction of plus 7,404.0 7,431.0 06:30 06:45 3.5' 12/2/2016 12/2/2016 0.75 PROD3 DRILL WPRT P Wiper back in hole, RIW 14 k 7,431.0 9,245.0 06:45 07:30 12/2/2016 12/2/2016 6.00 PROD3 DRILL DRLG P BOBD 1.4 bpm at 4,029 psi FS, BHP 9,245.0 9,322.0 07:30 13:30 4272, WHP 405, IA 289, OA 0, pumping beads, mix up 45 bbl of lubed pill (2% of each) no advantage seen, continue pumping beaded pills, 12/2/2016 12/2/2016 3.00 PROD3 DRILL DRLG P OBD 1.4 bpm at 4,025psi, BHP 4,284, 9,322.0 9,358.0 13:30 16:30 WHP 465, IA 357, OA 0 12/2/2016 12/2/2016 2.00 PROD3 DRILL DRLG P OBD with beaded pills, 40/20 beads, 9,358.0 9,384.0 16:30 18:30 22 fph, 1 k- DHWOB, 0 k- CTSW 1.4 bpm at 4,313 psi, BHP 385, WHP 414, IA 358, OA 0 12/2/2016 12/2/2016 4.25 PROD3 DRILL DRLG P Continue drilling pumping 40bbl 9,384.0 9,437.0 18:30 22:45 beaded pills followed by 20 bbls of mud from the active. CTW =-5KIbs, W OB = 0.8 - 1.0KIbs BHP 4350 psi. Multiple BHA wipers required to maintain weight transfer. 12/2/2016 12/3/2016 1.25 PROD3 DRILL WPRT P PUH for early wiper trip. Troubleshoot 9,437.0 9,223.0 22:45 00:00 mud pump #2. 12/3/2016 12/3/2016 1.50 PROD3 DRILL WPRT P Continue wiper trip to the window. 9,223.0 7,220.0 00:00 01:30 Troubleshoot MP#1 and MP#2 while pulling to the window. 12/3/2016 12/3/2016 1.50 PROD3 DRILL WPRT P Jog the 5 inch, while troubleshooting 7,220.0 7,380.0 01:30 03:00 pump issues. 12/3/2016 12/3/2016 4.00 PRODS DRILL SVRG T PJSM, fill out proper permits, Tear 7,380.0 7,380.0 03:00 07:00 down pump # 2 and replace failed seal, clear suction screen on pump # 1, and clear suction line, 12/3/2016 12/3/2016 0.25 PROD3 DRILL DLOG P RIH, Log the RA marker correction of 7,380.0 7,430.0 07:00 07:15 plus 4.0', 7,410'-7,430' 12/3/2016 12/3/2016 1.25 PROD3 DRILL TRIP P Wiper back in hole, RIW 14 k 7,430.0 9,430.0 07:15 08:30 12/3/2016 12/3/2016 2.00 PROD3 DRILL WPRT P Clean hole from 9,420' up to 9,210', 9,430.0 9,437.0 08:30 10:30 lowering pump rate to 0.3 bpm to RIH, up to 1.3 bpm PUH, RIH to drill ahead. 12/3/2016 12/3/2016 5.00 PROD3 DRILL DRLG P OBD, 1.3 bpm at 3,558 psi, BHP 9,437.0 9,440.0 10:30 15:30 4245, WHP 355, IA 229, OA 0, pumping beaded pills, pumping new mud pills, Multiple BHA wipers and PU's to help improve weight transfer. Page 28/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) IB -18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/3/2016 12/3/2016 4.00 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,100 psi, BHP 9,440.0 9,461.0 15:30 19:30 4300, WHP 500, IA 195, OA 0, continue to pump beaded pills, Multiple BHA wipers and PU's to help improve weight transfer. 12/3/2016 12/3/2016 0.75 PROD3 DRILL WPRT P PUH for BHA wiper to try and improve 9,461.0 9,461.0 19:30 20:15 weight transfer. Slight overpull at 9210 ft. 12/3/2016 12/4/2016 3.75 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,100 psi, BHP 9,461.0 9,495.0 20:15 00:00 4310, WHP 570, IA 195, OA 0, Multiple BHA wipers and PU's to help improve weight transfer. Swap mud. New mud at the bit at 9470 ft. New mud at surface at 9478 ft. 12/4/2016 12/4/2016 7.75 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,100 psi, BHP 9,495.0 9,555.0 00:00 07:45 4340, WHP 550, IA 227, OA 0, Multiple BHA wipers and PU's to help improve weight transfer. 12/4/2016 12/4/2016 0.25 PROD3 DRILL WPRT P Short wiper up hole, PUW 30 k 9,555.0 9,300.0 07:45 08:00 12/4/2016 12/4/2016 0.25 PROD3 DRILL WPRT P Wiper back in hole RIW 8 k 9,300.0 9,555.0 08:00 08:15 12/4/2016 12/4/2016 2.00 PROD3 DRILL DRLG P BOBD 1.3 bpm at 4,100 psi, BHP 9,555.0 9,565.0 08:15 10:15 4,334, WHP 589, IA 278, OA 0 12/4/2016 12/4/2016 2.00 PROD3 DRILL DRLG P OBD 1.3 bpm at 4,092 psi, BHP 9,565.0 9,577.0 10:15 12:15 4,366, WHP 611, IA 286, OA 0, pumping beaded pills again to assist with weight transfer. 12/4/2016 12/4/2016 1.00 PRODS DRILL DRLG P OBD, 1.3 bpm at 4,113 psi, BHP 9,577.0 9,581.0 12:15 13:15 4379, WHP 608, IA 290, OA 0, pumping 40 bbl beaded pill followed by 20 bead -free mud. 12/4/2016 12/4/2016 1.10 PROD3 DRILL WPRT P Wiper up hole, PUW 30 k, jog the 5 9,581.0 7,050.0 13:15 14:21 inch, 7,050' - 7390'. 12/4/2016 12/4/2016 1.75 PROD3 DRILL TRIP P Discuss with town plan forward, due to 7,050.0 72.1 14:21 16:06 slow ROP, and weight transfer, POOH for agitator. 12/4/2016 12/4/2016 2.40 PROD3 DRILL PULD P Tag surface, PJSM, PUD drilling 72.1 0.0 16:06 18:30 BHA# 31. Crew change. Prepare to function test BOPE. Bit grade 1 -1 -BU -A -X -I -BHA 12/4/2016 12/4/2016 1.00 PROD3 DRILL BOPE P Function test BOPE. Perform post test 0.0 0.0 18:30 19:30 greasing on stack and choke valves. 12/4/2016 12/4/2016 0.75 PROD3 DRILL SVRG P Service reel and injector. 0.0 0.0 19:30 20:15 12/4/2016 12/4/2016 2.25 PROD3 DRILL PULD P PJSM. PU and PD BHA #32 with 0.7° 0.0 0.0 20:15 22:30 AKO motor, agitator and RB HYC bit. 12/4/2016 12/5/2016 1.50 PRODS DRILL TRIP P Bump up, reset counters, RIH. Close 0.0 4,827.0 22:30 00:00 EDC and shallow test agitator. Good test. Continue in the hole. 12/5/2016 12/5/2016 0.50 PROD3 DRILL TRIP P Continue to RIH with BHA #32. 4,827.0 6,955.0 00:00 00:30 12/5/2016 12/5/2016 0.25 PROD3 DRILL DLOG P Tie-in to the K1 for no correction. 6,955.0 7,000.0 00:30 00:45 12/5/2016 12/5/2016 1.00 PROD3 DRILL WPRT P Continue to RIH to bottom with BHA 7,000.0 9,581.0 00:45 01:45 #32. Page 29/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/5/2016 12/5/2016 2.75 PROD3 DRILL DRLG P BOBD. Pumping 1.3 bpm at 4400 psi. 9,581.0 9,600.0 01:45 04:30 BHP = 4320 psi. WOB = 0.6 Klbs. ROP 5-8 fph. 12/5/2016 12/5/2016 8.25 PROD3 DRILL DRLG P OBD, 1.3 bpm at 4,254 psi, BHP 9,600.0 9,653.0 04:30 12:45 4,382, WHP 573, IA 355, OA 0 12/5/2016 12/5/2016 0.25 PROD3 DRILL WPRT P Short 100' BHA wiper up hole, PUW 9,653.0 9,653.0 12:45 13:00 25 k 12/5/2016 12/5/2016 2.50 PROD3 DRILL DRLG P BOBD, 1.3 bpm at 4,370 psi, BHP 9,653.0 9,680.0 13:00 15:30 4,379, WHP 583, IA 334, OA 0 12/5/2016 12/5/2016 0.25 PROD3 DRILL WPRT P Wiper up hole to 8,700', PUW 26 k 9,680.0 8,700.0 15:30 15:45 12/5/2016 12/5/2016 0.50 PROD3 DRILL WPRT P Wiper back in hole RIW 12 k 8,700.0 9,680.0 15:45 16:15 12/5/2016 12/5/2016 1.75 PROD3 DRILL DRLG P BOBD 1.3 bpm at 4,330 psi, BHP 9,680.0 9,687.0 16:15 18:00 4,390, WHP 587, IA 323, OA 0 12/5/2016 12/5/2016 0.50 PROD3 DRILL WPRT P BHA Wiper. Difficulty getting back to 9,687.0 9,687.0 18:00 18:30 bottom. 12/5/2016 12/5/2016 2.00 PROD3 DRILL DRLG P BOBD. 1.3 bpm at 4285 psi. BHP = 9,687.0 9,702.0 18:30 20:30 4360 psi. WOB 0-1.4 Klbs. ROP <10fph. IA 348 psi OA = 0. 12/5/2016 12/5/2016 1.75 PROD3 DRILL WPRT P PUH for wiper to the window. Pulled 9,702.0 7,400.0 20:30 22:15 heavy at 9367 ft and 9220 ft. Jog 5" casing 2x. 12/5/2016 12/5/2016 0.25 PROD3 DRILL DLOG P RBIH. Log RA for a +4 ft correction. 7,400.0 7,420.0 22:15 22:30 12/5/2016 12/5/2016 1.00 PROD3 DRILL WPRT P Continue RIH. Took weight at 9207 ft, 7,420.0 9,702.0 22:30 23:30 9226 ft and 9406 ft. 12/5/2016 12/6/2016 0.50 PROD3 DRILL DRLG P BOBD. 1.25 bpm at 4350 psi. BHP = 9,702.0 9,708.0 23:30 00:00 4360 psi. WOB 1.2 Klbs. ROP 15fph. IA 348 psi OA = 0. 12/6/2016 12/6/2016 9.75 PROD3 DRILL DRLG P Continue drilling ahead pumping 1.25 9,708.0 9,790.0 00:00 09:45 bpm at 4280 psi. BHP = 4340. IA 346psi, OA Opsi. Begin pumping 20bbls beaded pills followed by 20bbls mud from the active. BHA wipers as required to help maintain weight transfer. 12/6/2016 12/6/2016 2.50 PROD3 DRILL CIRC P TD called at 9790'. Wiper up hole and 9,790.0 8,870.0 09:45 12:15 circulate beaded pill out. Clean hole. Build Hi/Lo vis sweeps. 12/6/2016 12/6/2016 1.00 PRODS DRILL WPRT P RBIH to TD at 9790'. Pump 10x10 8,870.0 9,790.0 12:15 13:15 Hi/Lo sweeps at 1.2 BPM and 4300 psi. IA 371 psi, OA 0 psi. 12/6/2016 12/6/2016 0.75 PROD3 DRILL WPRT P Chase 10x10 sweep to 7060'. 9,790.0 7,060.0 13:15 14:00 Decrease rate to .5BPM through window at 7400'. Increase rate back to 1.3 BPM up to 7060'. 12/6/2016 12/6/2016 0.75 PROD3 DRILL WPRT P RBIH past EOB to 7970'. Pump 7,060.0 7,970.0 14:00 14:45 10x10 sweep at 1.3 BPM and 4300 psi. 12/6/2016 12/6/2016 2.37 PROD3 DRILL WPRT P PUH and chase sweep to window. 7,970.0 69.4 14:45 17:07 Decrease rate to .5BPM through window at 7400'. Continue wiper to swab. 12/6/2016 12/6/2016 1.64 PROD3 DRILL TRIP P RBIH to confirm TD. 69.4 6,944.0 17:07 18:45 12/6/2016 12/6/2016 0.24 PRODS DRILL DLOG P Log for K1 Marker and make 6,944.0 6,980.2 18:45 19:00 correction of + .5 ft. Page 30137 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) t x 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (WB) 12/6/2016 12/6/2016 1.22 PRODS DRILL TRIP P Continue RIH to confirm 6,980.2 9,788.0 19:00 20:13 TD.............slight tag at 9,226 ft and 9,476 ft ..... confirmed TD is at 9,788 ft. 12/6/2016 12/7/2016 3.78 PRODS DRILL DISP P Start PUH and laying in liner running 9,788.0 78.1 20:13 00:00 pill which is 12 ppg Potassium Formate with 2 ppg beads after pill reaches the bit......... Paint flags .......... at window and KW F with beads is being laid in while POOH........... 12/7/2016 12/7/2016 1.20 PRODS DRILL OWFF P At surface. Prep for flow check and 78.1 78.1 00:00 01:12 1 1 then perform a 30 minute flow check. 12/7/2016 12/7/2016 0.64 PRODS DRILL PULD P L/D BHA # 32. 78.1 0.0 01:12 01:50 Note: Bit Graded Out at 1 - 1 - bu - a - x - i -ct - td 12/7/2016 12/7/2016 3.83 COMPZ3 CASING PULD P PJSM and begin M/U 49 jts of liner. 0.0 1,545.6 01:50 05:40 P/U BHA #33 w/liner running assembly. 12/7/2016 12/7/2016 2.00 COMPZ3 CASING RUNL P RIH with BHA #33 and 49 jts of slotted 1,545.6 8,100.0 05:40 07:40 liner w/ non=ported bullnose. Tie in to at flag for -5' correction. PUW 26K. Continue RIH clean through window and build section. 12/7/2016 12/7/2016 2.00 COMPZ3 CASING RUNL P Start stacking weight at 8410', begin 8,100.0 9,787.0 07:40 09:40 working liner assembly down. Work liner by varying speeds and pump rates through tight spots at 8410', 8456', 8704', 8798', 8934', & 8976'. Heavy PU weights throughout. Work liner down to TD at 9787.4' pumping min rate. PUW 30K. Stack down WOB -8.51K. Release lower liner assembly at 9785' pumping 1.2 BPM, PUW 25K. Reset counter. TOL at 8284'. 12/7/2016 12/7/2016 2.90 COMPZ3 CASING TRIP P POOH and paint window flag at 6644'. 9,787.0 43.9 09:40 12:34 Continue POOH pumping across top. 12/7/2016 12/7/2016 0.60 COMPZ3 CASING OWFF P At surface. Prep for flow check and 43.9 0.0 12:34 13:10 then perform a 30 minute flow check. Good. 12/7/2016 12/7/2016 2.50 COMPZ3 CASING PULD P L/D BHA#33 over dead well. PJSM 0.0 705.8 13:10 15:40 and begin M/U 21 jts of liner. P/U BHA #34 w/liner running assembly. 12/7/2016 12/7/2016 1.88 COMPZ3 CASING RUNL P RIH w/ BHA#34 and 21 jts slotted liner 705.8 8,284.0 15:40 17:33 w/ ported bullnose. 12/7/2016 12/7/2016 0.33 COMPZ3 CASING RUNL P Tag top of liner at 8,284 ft. PUH for a 8,284.0 7,620.0 17:33 17:52 weight check and then tag again. Bring pump online and release off of upper liner assembly. Top of liner now at 7,620 ft. 12/7/2016 12/7/2016 5.70 COMPZ3 CASING TRIP P PUH slowly and start to displace well 7,620.0 33.5 17:52 23:34 with 8.7 drilling fluid through the GS...............pumping slow due to annular pressure ....................after well has been swapped over to drilling fluid, pump a Hi / Lo sweep and chase up to the 5" and make several jogs and then chase sweep to surface....... Page 31/37 Report Printed: 12/27/2016 v., t Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X. Operation (ftKB) End: Depth (ftKB) 12/7/2016 12/8/2016 0.43 COMPZ3 CASING TRIP P At surface. PJSM and then begin 33.5 33.5 23:34 00:00 Pressure Undeploy Operations. 12/8/2016 12/8/2016 0.80 COMPZ3 CASING PULD P Pressure undeploy BHA # 34. 33.5 33.5 00:00 00:48 12/8/2016 12/8/2016 0.19 COMPZ3 CASING PULD P L/DBHA #34. 33.5 0.0 00:48 00:59 12/8/2016 12/8/2016 0.30 COMPZ3 CASING PULD P P/U BHA #35 w/Anchored Billet 0.0 72.9 00:59 01:17 12/8/2016 12/8/2016 1.35 COMPZ3 CASING PULD P Pressure deploy BHA #35. 72.9 72.9 01:17 02:38 12/8/2016 12/8/2016 1.70 COMPZ3 CASING TRIP P RIH w/anchored billet 72.9 6,950.0 02:38 04:20 12/8/2016 12/8/2016 0.19 COMPZ3 CASING DLOG P Log K1 Marker and make a correction 6,950.0 6,980.0 04:20 04:31 of -1 ft 12/8/2016 12/8/2016 0.20 COMPZ3 CASING TRIP P Continue RIH w/Anchored Billet 6,980.0 7,620.6 04:31 04:43 12/8/2016 12/8/2016 0.39 COMPZ3 CASING TRIP P Tag top of liner at 7,620.6 6,620.6 6,609.6 04:43 05:07 ft... ......... release off of billet with no issues..............TOB is at 7,608.6 ft. 12/8/2016 12/8/2016 1.50 COMPZ3 CASING TRIP P POOH 6,609.6 72.9 05:07 06:37 12/8/2016 12/8/2016 1.00 COMPZ3 CASING PULD P PJSM and PUD BHA# 35. 72.9 72.9 06:37 07:37 12/8/2016 12/8/2016 0.75 COMPZ3 CASING PULD P L/D BHA#35 72.9 0.0 07:37 08:22 12/8/2016 12/8/2016 0.75 COMPZ3 CASING PULD P P/U BHA#36 0.0 0.0 08:22 09:07 12/8/2016 12/8/2016 1.00 PROD4 DRILL PULD P PJSM, PD kickoff/drilling BHA #36 0.0 72.2 09:07 10:07 12/8/2016 12/8/2016 1.55 PROD4 DRILL TRIP P RIH w/ AL2 kickoff/drilling BHA# 36, 72.2 6,949.0 10:07 11:40 2.0 AKO motor and RB HCC bi-center bit 12/8/2016 12/8/2016 0.23 PROD4 DRILL DLOG P Log K1 marker for -1 ft. correction. 6,949.0 6,976.0 11:40 11:54 12/8/2016 12/8/2016 0.50 PROD4 DRILL TRIP P Continue RIH. 6,976.0 7,610.0 11:54 12:24 12/8/2016 12/8/2016 1.10 PROD4 STK KOST P Dry tag TOB at 7610', PUW 27K. 7,610.0 7,640.0 12:24 13:30 Begin milling billet, drill off billet to 7640'. PUH to 7582'. Dry drift clean past billet area. No issues. 12/8/2016 12/8/2016 5.83 PROD4 DRILL DRLG P Continue drilling ahead, pumping 1.3 7,640.0 7,981.0 13:30 19:19 BPM, at 3900 psi. BHP = 4200 psi, WHP = 430 psi. WOB -1-1.5 Klbs, ROP --50-80 FPH 12/8/2016 12/8/2016 1.59 PROD4 DRILL WPRT P Having weight transfer 7,981.6 7,981.6 19:19 20:55 issues.............pump a 5 x 5 sweep and chase up hole to 5.....jog this area several times to clean up and then RBIH Note: Increased amount of cuttings seen across shaker after wiper 12/8/2016 12/9/2016 3.08 PROD4 DRILL DRLG P BOBD, pumping 1.4 BPM, at 4036 psi. 7,981.6 7,999.0 20:55 00:00 BHP = 4100 psi, WHP = 366 psi. WOB -1-2.4 Klbs, ROP -8 to 10 FPH Page 32/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/9/2016 12/9/2016 8.30 PROD4 DRILL DRLG P Drilling ahead in 1 B-18 AL2 Build 7,999.0 8,054.0 00:00 08:18 section, pumping 1.4 BPM, at 4142 psi. BHP = 4100 psi, WHP = 500 psi. WOB -2 - 2.9 Klbs, ROP -8 to 10 FPH Note: Got back confirmed samples of Ankorite at 01:15hrs 12/9/2016 12/9/2016 3.40 PROD4 DRILL DRLG P Pump 5x5 sweep. PUW 26K. 8,054.0 8,085.0 08:18 11:42 Continue drilling ahead in build section. ROP picking up to -10- 20FPH, 1.3 BPM, at 4000 psi, BHP 4200, WHP 415, WOB 2.5 Klbs. 12/9/2016 12/9/2016 0.10 PROD4 DRILL SRVY P PU for geo survey. PUW 26K. Lower 8,085.0 8,068.0 11:42 11:48 pump rate to 1 BPM. Obtain clean geo survey. 12/9/2016 12/9/2016 3.50 PROD4 DRILL DRLG P BOBD, 1.3 BPM, 4100 psi, WHP 420, 8,068.0 8,090.0 11:48 15:18 BHP 4200, WOB 1.2KIbs, ROP -10 FPH, IA 383, OA 0. Pumping 5x5 sweeps and pick ups as needed. 12/9/2016 12/9/2016 0.50 PROD4 DRILL DRLG P Drilled ahead to EOB at 8102.58 ft. 8,090.0 8,102.6 15:18 15:48 12/9/2016 12/9/2016 1.50 PROD4 DRILL WPRT P Pumped final 1 0x1 0 sweep. Chased 8,102.6 72.9 15:48 17:18 to 7060. Decrease rate to .3 BPM through window. RBIH and jog 5" casing from 7040'-8090'. Continue chase sweep out of hole. 12/9/2016 12/9/2016 1.68 PROD4 DRILL PULD P PJSM and begin pressure undeploy 72.9 72.9 17:18 18:58 BHA #36 12/9/2016 12/9/2016 1.00 PROD4 DRILL PULD P L/D BHA#36 72.9 0.0 18:58 19:58 12/9/2016 12/9/2016 2.02 PROD4 WHDBOP BOPE P Prep (Stab back on well with nozzle 0.0 0.0 19:58 22:00 and jet on stack several times, grease stack, etc.) for BOPE test. 12/9/2016 12/10/2016 2.00 PROD4 WHDBOP BOPE P Start full bi-weekly BOPE test. Test 0.0 0.0 22:00 00:00 wiitness waived by Jeff Jones, AOGCC. 12/10/2016 12/10/2016 5.00 PROD4 WHDBOP BOPE P Complete full bi-weekly BOPE test 0.0 0.0 00:00 05:00 250 psi/3500 psi including inner reel valve (6 hour test). No test failures. 12/10/2016 12/10/2016 1.12 PROD4 DRILL CTOP P PJSM and prep to cut coil and perform 0.0 0.0 05:00 06:07 slack management. Remove CTC, boot end of wire to seal for slack management. 12/10/2016 12/10/2016 6.78 PROD4 DRILL CTOP P Cut 1,600' of coil and 1,612' of aline. 0.0 0.0 06:07 12:54 Install boot end of wire and heat shrink wrap. Perform slack management. Cut an additional 100' of coil (Cut 1,700' total of coil and 1,612' total of aline). 12/10/2016 12/10/2016 4.50 PROD4 DRILL CTOP P Prep coil and re -head CTC, pull test 0.0 0.0 12:54 17:24 50k, re -head, install UQC, P/T 4,500 psi, displace coil to drilling fluid. 12/10/2016 12/10/2016 2.60 PROD4 DRILL PULD P P/U BHA # 37 ( AL2 Lateral Drilling 0.0 72.8 17:24 20:00 BHA) and presure deploy Page 33/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (MB) 12/10/2016 12/10/2016 1.00 PROD4 DRILL EQRP T After pressure deploying and ready to 72.8 72.8 20:00 21:00 RIH, lost power to tools ........... pressure undeploy, troubleshoot, repair and pressure deploy again. Note: Problem was 1/4" of the eline at the UQC was found to have been scrapped bare and was shorting out. Wire cut and reheaded. 12/10/2016 12/10/2016 1.40 PROD4 DRILL TRIP P RIH with EDC open pumping at 1 bpm 72.8 6,950.0 21:00 22:24 to facilitate pushing slack forward. 12/10/2016 12/10/2016 0.22 PROD4 DRILL DLOG P Log for K1 Marker and make 6,950.0 6,973.0 22:24 22:37 correction of minus 2 ft. 12/10/2016 12/10/2016 0.61 PROD4 DRILL TRIP P Continue RIH (closed the EDC at 6,973.0 8,102.0 22:37 23:13 7,350 ft) 12/10/2016 12/11/2016 0.78 PROD4 DRILL DRLG P BOBD. Pumping at 1.4 bpm Circ 8,102.0 8,172.0 23:13 00:00 Press 4,077 WHIP 379 BHP 4,223 WOB 1.6 klb ROP 64 to 88 fph 12/11/2016 12/11/2016 4.00 PROD4 DRILL DRLG P BOBD. Pumping at 1.4 bpm Circ 8,172.0 8,326.7 00:00 04:00 Press 4,077 WHIP 379 BHP 4,223 WOB 1.6 klb ROP 64 to 88 fph Note: Around 8,320 ft ROP slowed drastically .......... Geo thinks it's the fault........... 12/11/2016 12/11/2016 0.38 PROD4 DRILL WPRT P Perform a 300 ft wiper trip to help 8,326.7 8,326.7 04:00 04:22 alliviate weight transfer issues..............we are either in ankorite or at the fault or both..............we have pumped several sweeps prior to PUH 12/11/2016 12/11/2016 4.41 PROD4 DRILL DRLG P BOBD. Pumping at 1.5 bpm Circ 8,326.7 8,332.0 04:22 08:47 Press 4,215 WHIP 437 BHP 4,259 WOB 1.0 klb ROP 1 to 2 FPH. PU's as needed. 12/11/2016 12/11/2016 5.39 PROD4 DRILL DRLG P ROP averaging 2-4 FPH. Drilling 8,332.0 8,347.1 08:47 14:10 ahead, 1.5 BPM, Circ 4100 psi, WHIP 342 psi, BHP 4210 psi, WOB 1.5-2 klbs. 12/11/2016 12/12/2016 9.83 PROD4 DRILL DRLG P Continue drilling ahead at 3-5 FPH, 8,347.1 8,378.4 14:10 00:00 1.4 BPM, Circ 4115 PSI, WHIP 250 psi, BHP 4149 psi, WOB 1-3 klbs. 12/12/2016 12/12/2016 8.00 PROD4 DRILL DRLG P Continue drilling ahead at 3-5 FPH, 8,378.4 8,400.0 00:00 08:00 1.4 BPM, Circ 4115 PSI, WHP 250 psi, BHP 4149 psi, WOB 1-3 klbs. PU's and restarts as needed. 12/12/2016 12/12/2016 0.90 PROD4 DRILL DRLG P Swap to mud system #8 (8.65 ppg 8,400.0 8,400.0 08:00 08:54 PowerPro SF) with new mud at the bit at 8,400 ft and continue drilling ahead. 12/12/2016 12/12/2016 6.30 PROD4 DRILL DRLG P Continue drilling ahead 3-5 FPH, 1.5 8,400.0 8,414.0 08:54 15:12 BPM, Circ 3950 psi, WHIP 505, BHP 4140 psi, WOB 2-3 Klbs. PU's and restarts as needed. Adjust trip schedule holding 11.8 ppg at window to help with losses Geo samples continue to show —15% ankorite. Page 34137 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) IB -18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Lode Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 12/12/2016 12/12/2016 4.28 PROD4 DRILL DRLG P Continue drilling ahead -2-4 FPH, 1.5 8,414.0 8,421.2 15:12 19:28 BPM, Circ 4000 psi, WHP 500, BHP 4140 psi, WOB 2-3 Klbs. PU's and restarts as needed. 12/12/2016 12/12/2016 0.40 PROD4 DRILL TRIP P Discuss with town and decision made 8,421.2 8,200.0 19:28 19:52 to POOH for new motor and bit. PUW 26K. 12/12/2016 12/12/2016 2.00 PROD4 DRILL TRIP P Pump 5x5 sweep and chase to 8,200.0 71.6 19:52 21:52 window at 7,393', Jog 5" casing from 7,060' to 7,373'. POOH w/ open EDC. 12/12/2016 12/12/2016 1.00 PROD4 DRILL PULD P PJSM, PUD BHA#37. 71.6 71.6 21:52 22:52 Bit grade 7-5-bt-a-x-i-ct-pr 12/12/2016 12/12/2016 0.60 PROD4 DRILL PULD P M/U BHA# 38 w/ Weatherford .5° AKO 71.6 71.6 22:52 23:28 motor and a SRFE3408MB7 HYC bit. 12/12/2016 12/13/2016 0.52 PROD4 DRILL PULD P PJSM and start PD BHA#38. 71.6 71.6 23:28 00:00 12/13/2016 12/13/2016 0.40 PROD4 DRILL PULD P Completed pressure deploying 71.6 71.6 00:00 00:24 BHA#38 w/.5° AKO Weathford motor and a SRFE3408MB7 HYC bit. 12/13/2016 12/13/2016 1.40 PROD4 DRILL TRIP P RIH with open EDC pumping at 71.6 6,945.0 00:24 01:48 minimum rate 12/13/2016 12/13/2016 0.27 PROD4 DRILL DLOG P Log K1 Marker and make correction of 6,945.0 6,973.0 01:48 02:04 minus 2 ft 12/13/2016 12/13/2016 0.49 PROD4 DRILL TRIP P Continue RIH with now closed EDC 6,973.0 8,422.0 02:04 02:33 pumping minimum rate. 12/13/2016 12/13/2016 1.55 PROD4 DRILL DRLG P BOBD. Pumping at 1.41 bpm Circ = 8,422.0 8,446.0 02:33 04:06 4,248 WHP = 562 CTW = 13.66 ROP = 7 fph WOB = 2.24 klb Note: Experiencing some severe vibration issues once on bottom drilling ......... Note: Aftyer 10 minutes on bottom drilling, computer screens for DD goes pink,,,,,,,,,, PUH and re -boot computers ......... RBIH and continue drilling .... 5 minute delay. 12/13/2016 12/13/2016 3.27 PROD4 DRILL DRLG P Pumping at 1.39 bpm Circ = 4,078 8,446.0 8,510.0 04:06 07:22 WHP = 560 CTW = 6.30 ROP = 24 to 75 fph WOB = 2.24 klb Note: We seemed to have broke through after 8,440 ft. This is wher we had our last stall and now the ROP is increasing 12/13/2016 12/13/2016 1.80 PROD4 DRILL WPRT P After 0700 hr morning meeting 8,568.0 7,080.0 07:22 09:10 engineer called and due to faulting into the Miluveach Formation, pump a 10 x 10 sweep and chase up hole ( jog 5" several times ) and hopefully by that time twon will have a decision on a way forward (plug back or run liner). PUH and pump a 10 x 10 sweep and chase up hole once out of bit. PUW = 27 k.............Having issue with choke periodically clogging ........... more clay coming across shaker now ....... make several jogs in 5" Page 35/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) 1B-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (WB) End Depth (ftKB) 12/13/2016 12/13/2016 1.10 PROD4 DRILL TRIP P Another call from town and instructed 7,080.0 8,542.0 09:10 10:16 once completing jogs in 5", RBI and pump another sweep and chase up hole again as above whilst meetings are being held on AL2 Lateral's status....... 12/13/2016 12/13/2016 3.34 PROD4 DRILL TRIP P BOB. After 5 x 5 exits bit plus a few 8,542.0 72.8 10:16 13:37 bbls, chase up hole, jog through 5" again and chase to surface. Note: Town called again and decision made to run liner. 12/13/2016 12/13/2016 1.38 PROD4 DRILL TRIP P At surface, RBIH to called TD to start 72.8 6,948.0 13:37 15:00 laying in liner running pill and then KW F............ 12/13/2016 12/13/2016 0.23 PROD4 DRILL DLOG P Log the K1 Marker and make a 6,948.0 6,992.0 15:00 15:13 correction of minus 2 ft 12/13/2016 12/13/2016 0.92 PROD DRILL TRIP P Continue RIH to 8,230 ft .............. 6,992.0 8,230.0 15:13 16:09 12/13/2016 12/13/2016 2.35 PROD4 DRILL DISP P After liner running pill gets to the bit 8,230.0 72.8 16:09 18:30 and above, start PUH and laying in pill and then KW F. Paint flags at 6,900 ft and 6,000 ft, continue laying in beaded liner pill to surface. 12/13/2016 12/13/2016 0.50 PROD4 DRILL OWFF P On surface, monitor well for flow, 72.8 72.8 18:30 19:00 PJSM- LD BHA over open hole. 12/13/2016 12/13/2016 0.85 PROD4 DRILL PULD P LD BHA #38 72.8 0.0 19:00 19:51 12/13/2016 12/13/2016 0.65 COMPZ4 CASING PUTB P Prep floors for liner run. PJSM- 0.0 0.0 19:51 20:30 running liner 12/13/2016 12/13/2016 1.95 COMPZ4 CASING PUTB P MU AL2 liner assembly- bullnose, 21 0.0 1,202.2 20:30 22:27 jts slotted, Halliburton swell packer, 17 jts solids, 6 ft SBR deployment sleeve. BOP drill. Clean floors. 12/13/2016 12/13/2016 0.90 COMPZ4 CASING PUTB P PJSM- MU AL2 liner assembly to BHA 1,202.2 1,246.4 2227 2321 #39, MU to CoilTrac tools, surface test. 12/13/2016 12/14/2016 0.65 COMPZ4 CASING RUNL P RIH with AL2 liner assembly 1,246.4 3,990.0 23:21 00:00 12/14/2016 12/14/2016 1.40 COMPZ4 CASING RUNL P Continue RIH, tie in at flag for minus 3,990.0 8,196.0 00:00 01:24 3.04 ft, PUW 26k, continue RIH, stack at 8,058 ft, work liner down to 8,196 ft, PUW 28k, WOB -2.7k, 12/14/2016 12/14/2016 0.20 COMPZ4 CASING RUNL P Release off liner at 1.3 bpm, PUW 8,196.0 6,994.0 01:24 01:36 23k, WOB 2.6k, reset counters to bit depth. Mid element of swell packer at 7,535 ft, TOP of SBR at 6,994 ft. 12/14/2016 12/14/2016 2.20 COMPZ4 CASING DISP P Displace well to seawater, LRS on 6,994.0 6,994.0 01:36 03:48 site, PJSM with LRS 12/14/2016 12/14/2016 1.00 COMPZ4 CASING TRIP P POOH pumping seawater to 2,500 ft. 6,994.0 2,500.0 03:48 04:48 LRS P/T lines and equipment. 12/14/2016 12/14/2016 1.20 COMPZ4 CASING FRZP P 2,500 ft. LRS pump 30 bbls diesel, 2,500.0 500.0 04:48 06:00 RDMO LRS. Open EDC at 500 ft 12/14/2016 12/14/2016 0.25 COMPZ4 CASING TRIP P Continue POOH 500.0 42.8 06:00 06:15 12/14/2016 12/14/2016 1.40 COMPZ4 CASING PULD P At surface, tagged up. Pressure 42.8 42.8 06:15 07:39 Undeploy after PJSM. 12/14/2016 12/14/2016 0.35 COMPZ4 CASING PULD P L/D BHA # 39. 42.8 0.0 07:39 08:00 Page 36/37 Report Printed: 12/27/2016 Operations Summary (with Timelog Depths) IB-18 Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 12/14/2016 12/14/2016 1.00 DEMOB WHDBOP MPSP P Prep for BPV installment. 0.0 0.0 08:00 09:00 12/14/2016 12/14/2016 2.00 DEMOB WHDBOP MPSP P Valve Crew shows up and installs 0.0 0.0 09:00 11:00 BPV 12/14/2016 12/14/2016 5.00 DEMOB WHDBOP DISP P Pump corrosion Inhibitor through coil 0.0 0.0 11:00 16:00 and then blow down coil. 12/14/2016 12/14/2016 2.00 DEMOB WHDBOP RURD P Start rig move check list, blow down 0.0 0.0 16:00 18:00 steam lines, disconnect PUTZ, remove mouse holes, etc.... 12/14/2016 12/14/2016 2.00 DEMOB WHDBOP NUND P ND BOPE, torque checked, remove 0.0 0.0 18:00 20:00 kill and deployment lines. "'Rig released at 20:00 on 12/14/2016. Page 37/37 Report Printed: 12/27/2016 sConocoPhillip ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1B Pad 1 B-18AL3-01 50-029-22472-63 Baker Hughes INTEQ Definitive Survey Report 20 December, 2016 FeA BAKER HUGHES .10" ConocoPhillips IKAaI ConocoPhillips Definitive Survey Report BAKER HUGHES Company: Project: Site: Well: Wellbore: Design: ConocoPhillips (Alaska) Inc. -Kupl Kuparuk River Unit Kuparuk 1 B Pad 1B-18 1 B-18AL3-01 1 B-18AL3-01 Local Co-ordinate Reference: Well 1 B-18 TVD Reference: 1 B-18 @ 102.00usft MD Reference: 1 B-18 @ 102.00usft North Reference: True Survey Calculation Method: Minimum Curvature Database: EDM Alaska NSK Sandbox Project Kuparuk River Unit, North Slope Alaska, United States~ Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level i Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point x Map Zone: Alaska Zone 04 Using geodetic scale factor Well 113-18 Well Position +N/ -S 0.00 usft Northing: 5,969,647.06 usft Latitude: 70° 19'40.248 N +E/ -W 0.00 usft Easting: 550,148.90usft Longitude: 149° 35 35.868 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 61.20 usft Wellbore 1 B-18AL3-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) ti BGGM2016 10/1/2016 18.01 80.96 57,551 Design 113-18AL ....... _ _....3-01 __ - - Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 8,350.60 Vertical Section: Depth From (TVD) +NI -S +E/ -W Direction (usft) (usft) (usft) (1) 40.80 0.00 0.00 90.00 Survey Program Date 12/16/2016 From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Start Date Survey End Date 469.67 6,897.50 1 B-18 (1 B-18) MWD MWD - Standard 4/28/1994 4/28/1994 7,392.00 8,350.60 1B-18AL3PB1 (1B-18AL3PB1) MWD MWD - Standard 11/5/2016 11/11/2016 8,387.00 10,872.23 113-18AL3-01 (113-18AL3-01) MWD MWD - Standard 11/21/2016 11/25/2016 12/20/2016 9:01:25AM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips FUS ConocoPhillips BAKER Definitive Survey Report UGHES Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Well 1 B-18 Project: Kuparuk River Unit TVD Reference: 1 B-18 @ 102.00usft Site: Kuparuk 1 B Pad MD Reference: 18-18 @ 102.00usft Well: 18-18 North Reference: True Wellbore: 1 B-18AL3-01 Survey Calculation Method: Minimum Curvature Design: 1 B-18AL3-01 Database: EDM Alaska NSK Sandbox Survey MD Inc Azi TVD TVDSS +N/ -S Map +E/ -W Map DLS Vertical (usft) (1) V) (usft) (usft) (usft) Northing (usft) East; Easting (°/100') Section Survey Tool Name Annotation (ft) (ft (ft) 8,350.60 89.39 57.58 6,696.47 6,594.47 -2,412.00 422.76 5,967,238.17 550,587.73 1.42 422.76 MWD (2) TIP 8,387.00 86.17 56.06 6,697.88 6,595.88 -2,392.10 453.20 5,967,258.27 550,618.03 9.77 453.20 MWD (3) KOP 8,415.79 83.97 61.38 6,700.36 6,598.36 -2,377.21 477.70 5,967,273.32 550,642.43 19.93 477.70 MWD (3) s 8,445.81 84.71 66.94 6,703.32 6,6D1.32 -2,364.20 504.57 5,967,286.52 550,669.22 18.59 504.57 MWD (3) 8,475.55 88.13 71.09 6,705.18 6,603.18 -2,353.57 532.28 5,967,297.32 550,696.84 18.06 532.28 MWD (3) 8,505.49 88.62 76.20 6,706.03 6,604.03 -2,345.15 560.99 5,967,305.94 550,725.49 17.14 560.99 MWD (3) 3 6,535.22 92.06 76.46 6,705.85 6,603.85 -2,338.12 589.87 5,967,313.16 550,754.32 11.60 589.87 MWD (3) 8,565.47 95.87 73.40 6,703.76 6,601.76 -2,330.28 619.00 5,967,321.19 550,783.40 16.14 619.00 MWD (3) a 8,595.44 94.76 68.59 6,700.98 6,598.98 -2,320.57 647.21 5,967,331.10 550,811.54 16.40 647.21 MWD (3) k 8,625.50 94.37 64.18 6,698.59 6,596.59 -2,308.57 674.65 5,967,343.28 550,838.90 14.68 674.65 MWD (3) 8,655.37 94.09 59.81 6,696.38 6,594.38 -2,294.58 700.95 5,967,357.44 550,865.10 14.62 700.95 MWD (3) 8,685.47 92.40 56.22 6,694.68 6,592.68 -2,278.67 726.43 5,967,373.52 550,890.47 13.16 726.43 MWD (3) 8,715.22 89.69 53.75 6,694.14 6,592.14 -2,261.60 750.79 5,967,390.75 550,914.71 12.32 750.79 MWD (3) 8,745.15 86.99 51.70 6,695.00 6,593.00 -2,243.48 774.59 5,967,409.02 550,938.39 11.32 774.59 MWD (3) 8,775.29 84.06 49.34 6,697.36 6,595.36 -2,224.38 797.78 5,967,428.27 550,961.45 12.47 797.78 MWD (3) 1 8,805.40 84.56 53.07 6,700.34 6,598.34 -2,205.62 821.13 5,967,447.19 550,984.67 12.44 821.13 MWD (3) 8,835.07 84.69 57.56 6,703.12 6,601.12 -2,188.81 845.41 5,967,464.16 551,008.84 15.07 845.41 MWD (3) 8,865.19 83.82 63.04 6,706.14 6,604.14 -2,173.97 871.43 5,967,479.18 551,034.76 18.33 871.43 MWD (3) 8,895.15 8 84.65 67.64 6,709.15 6,607.15 -2,161.53 898.52 5,967,491.79 551,061.76 15.53 898.52 MWD (3) 8,925.25 84.03 66.55 6,712.12 6,610.12 -2,149.88 926.11 5,967,503.63 551,089.26 4.15 926.11 MWD (3) 8,955.01 2 84.16 62.54 6,715.18 6,613.18 -2,137.16 952.83 5,967,516.53 551,115.90 13.41 952.83 MWD (3) @@p 8,985.36 84.93 57.88 6,718.07 6,616.07 -2,122.15 979.04 5,967,531.71 551,142.01 15.49 979.04 MWD (3) 9,015.81 86.28 59.49 6,720.40 6,618.40 -2,106.37 1,004.98 5,967,547.66 551,167.84 6.89 1,004.98 MWD (3) t E 9,045.49 88.00 63.33 6,721.88 6,619.88 -2,092.19 1,031.00 5,967,562.01 551,193.76 14.16 1,031.00 MWD (3) 9,075.07 (, 88.10 67.53 6,722.89 6,620.89 -2,079.90 1,057.88 5,967,574.48 551,220.56 14.19 1,057.88 MWD (3) e u 9,105.53 87.76 71.54 6,723.99 6,621.99 -2,069.26 1,086.39 5,967,585.31 551,248.99 13.20 1,086.39 MWD (3) 9,137.69 87.23 76.39 6,725.40 6,623.40 -2,060.39 1,117.26 5,967,594.39 551,279.80 15.16 1,117.26 MWD (3) d 9,165.61 88.03 79.82 6,726.55 6,624.55 -2,054.64 1,144.56 5,967,600.32 551,307.05 12.60 1,144.56 MWD (3) � 9,195.50 88.62 83.94 6,727.43 6,625.43 -2,050.42 1,174.13 5,967,604.73 551,336.59 13.92 1,174.13 MWD (3) { 9,228.61 90.15 90.27 6,727.78 6,625.78 -2,048.75 1,207.18 5,967,606.62 551,369.62 19.67 1,207.18 MWD (3) k 1212012016 9:01:25AM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips FGa9 ConocoPhillips Definitive Survey Report HUGHES Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 B Pad Well: 1B-18 Wellbore: 1 B-18AL3-01 Design: 1 B-18AL3-01 Survey Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 1 B-18 1 B-18 @ 102.00usft 1 B-18 @ 102.00usft True Minimum Curvature EDM Alaska NSK Sandbox MD Inc Azi ND NDSS +N/ -S +E/ -W Map Map DLS Vertical (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting (°/100' ) Section Survey Tool Name Annotation (ft) (ft) (ft) 9,255.25 93.93 92.00 6,726.83 6,624.83 -2,049.28 1,233.79 5,967,606.28 551,396.24 15.60 1,233.79 MWD (3) 9,285.30 98.82 93.55 6,723.50 6,621.50 -2,050.72 1,263.61 5,967,605.03 551,426.06 17.06 1,263.61 MWD (3) 9,315.59 99.69 97.27 6,718.63 6,616.63 -2,053.54 1,293.36 5,967,602.41 551,455.83 12.46 1,293.36 MWD (3) 4 9,345.41 a 99.47 102.87 6,713.66 6,611.66 -2,058.68 1,322.30 5,967,597.47 551,484.80 18.53 1,322.30 MWD (3) t 9,375.52 100.66 108.44 6,708.39 6,606.39 -2,066.67 1,350.84 5,967,589.67 551,513.39 18.64 1,350.84 MWD (3) 9,405.68 1DD.03 113.24 6,702.97 6,600.97 -2,077.22 1,378.56 5,967,579.30 551,541.18 15.79 1,378.56 MWD r (3) 9,435.55 95.69 111.92 6,698.89 6,596.89 -2,088.58 1,405.87 5,967,568.13 551,568.56 15.17 1,405.87 MWD (3) G 9,465.58 95.16 108.97 6,696.05 6,594.05 -2,099.02 1,433.88 5,967,557.87 551,596.64 9.94 1,433.88 MWD (3) f 9,495.69 95.22 106.22 6,693.33 6,591.33 -2,108.08 1,462.46 5,967,549.00 551,625.28 9.10 1,462.46 MWD (3) 9,525.45 95.63 101.51 6,690.51 6,588.51 -2,115.18 1,491.22 5,967,542.10 551,654.08 15.82 1,491.22 MWD (3) 1 9,555.61 92.92 100.22 6,688.26 6,586.26 -2,120.85 1,520.75 5,967,536.63 551,683.64 9.95 1,520.75 MWD (3) 9,585.45 93.41 100.18 6,686.62 6,584.62 -2,126.13 1,550.07 5,967,531.55 551,713.00 1.65 1,550.07 MWD (3) # 9,615.41 94.39 105.31 6,684.58 6,582.58 -2,132.72 1,579.22 5,967,525.15 551,742.18 17.39 1,579.22 MWD (3) 9,645.47 91.69 107.04 6,682.98 6,580.98 -2,141.08 1,608.04 5,967,516.98 551,771.06 10.66 1,608.04 MWD (3) 9,675.23 90.55 112.42 6,682.40 6,580.40 -2,151.12 1,636.04 5,967,5D7.13 551,799.12 18.48 1,636.04 MWD (3) { 9,705.35 92.95 117.15 6,681.48 6,579.48 -2,163.74 1,663.36 5,967,494.70 551,826.53 17.60 1,663.36 MWD (3) ri 9,735.22 94.52 120.59 6,679.53 6,577.53 -2,178.12 1,689.46 5,967,480.49 551,852.72 12.64 1,689.46 MWD (3) e 9,765.39 94.67 122.68 6,677.12 6,575.12 -2,193.90 1,715.07 5,967,464.89 551,878.42 6.92 1,715.07 MWD (3) 9,795.23 97.73 121.24 6,673.89 6,571.89 -2,209.60 1,740.23 5,967,449.36 551,903.69 11.32 1,740.23 MWD (3) 9,825.31 97.51 117.75 6,669.90 6,567.90 -2,224.27 1,766.18 5,967,434.86 551,929.73 11.52 1,766.18 MWD (3) 9,855.05 94.76 115.01 6,666.72 6,564.73 -2,237.41 1,792.66 5,967,421.90 551,956.30 13.02 1,792.66 MWD (3) 9,885.41 93.16 112.22 6,664.63 6,562.63 -2,249.54 1,620.41 5,967,409.96 551,984.13 10.57 1,820.41 MWD (3) v 9,915.10 89.66 110.19 6,663.90 6,561.90 -2,260.27 1,848.08 5,967,399.41 552,011.86 13.63 1,848.08 MWD (3) 9,945.11 85.75 109.17 6,665.10 6,563.10 -2,270.37 1,876.30 5,967,389.50 552,040.15 13.46 1,876.30 MWD (3) 9,975.05 85.88 105.75 6,667.28 6,565.28 -2,279.33 1,904.78 5,967,380.74 552,068.69 11.40 1,904.78 MWD (3) 10,005.26 85.64 102.45 6,669.52 6,567.52 -2,286.66 1,934.00 5,967,373.59 552,097.95 10.92 1,934.00 MWD (3) 10,035.22 88.19 99.71 6,671.13 6,569.13 -2,292.41 1,963.35 5,967,368.04 552,127.34 12.48 1,963.35 MWD (3) 10,065.31 88.74 96.06 6,671.94 6,569.94 -2,296.54 1,993.14 5,967,364.12 552,157.15 12.26 1,993.14 MWD (3) 10,095.63 90.06 92.55 6,672.26 6,570.26 -2,298.81 2,023.37 5,967,362.04 552,187.39 12.37 2,023.37 MWD (3) 10,125.40 89.60 88.85 6,672.34 6,570.34 -2,299.18 2,053.13 5,967,361.88 552,217.15 12.52 2,053.13 MWD (3) 10,155.19 91.14 86.22 6,672.15 6,570.15 -2,297.90 2,082.89 5,967,363.36 552,246.90 10.23 2,082.89 MWD (3) 12/20/2016 9:01:25AM Page 4 COMPASS 5000.1 Build 74 -- ConocoPhillips ConocoPhillips TVD TVDSS Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kupl Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 1B Pad MD Reference: Well: 1 B-18 North Reference: Wellbore: 18-18AL3-01 Survey Calculation Method: Design: 1 B-18AL3-01 Database: Survey va_ FIAP.I BAKER HUGHES Well 1 B-18 s 1 B-18 @ 102.00usft 1 B-18 @ 102.00usft True ( Minimum Curvature EDM Alaska NSK Sandbox MD Inc Azi TVD TVDSS +N/ -S +E/ -W Map Map DLS Vertical (usft) (1) (1) (usft) (usft) (usft) (usft) rth Northing East (°l100') Section Section Survey Tool Name (ft; (ft) 10,185.17 94.92 87.03 6,670.57 6,568.57 -2,296.13 2,112.77 5,967,365.32 552,276.77 12.89 2,112.77 MWD (3) 10,215.17 97.08 86.98 6,667.43 6,565.43 -2,294.57 2,142.57 5,967,367.08 552,306.54 7.20 2,142.57 MWD (3) 10,245.23 95.32 93.78 6,664.18 6,562.18 -2,294.78 2,172.43 5,967,367.08 552,336.41 23.24 2,172.43 MWD (3) 10,276.51 96.77 91.86 6,660.89 6,558.89 -2,296.31 2,203.5D 5,967,365.75 552,367.48 7.66 2,203.50 MWD (3) 10,306.34 97.92 91.05 6,657.07 6,555.07 -2,297.06 2,233.07 5,967,365.20 552,397.06 4.70 2,233.07 MWD (3) 10,335.15 98.88 84.67 6,652.86 6,550.86 -2,296.00 2,261.54 5,967,366.45 552,425.51 22.16 2,261.54 MWD (3) 10,365.71 98.56 80.01 6,648.22 6,546.22 -2,291.97 2,291.46 5,967,370.68 552,455.41 15.11 2,291.46 MWD (3) 10,395.40 97.05 76.63 6,644.19 6,542.19 -2,286.02 2,320.26 5,967,376.82 552,484.17 12.37 2,320.26 MWD (3) 10,425.49 94.86 78.53 6,641.07 6,539.07 -2,279.58 2,349.49 5,967,383.45 552,513.34 9.61 2,349.49 MWD (3) 10,455.21 94.36 83.24 6,638.68 6,536.68 -2,274.89 2,378.73 5,967,388.34 552,542.55 15.89 2,378.73 MWD (3) 10,485.40 95.57 87.78 6,636.07 6,534.07 -2,272.53 2,408.71 5,967,390.90 552,572.51 15.51 2,408.71 MWD (3) 10,515.15 94.58 92.43 6,633.43 6,531.43 -2,272.59 2,438.33 5,967,391.04 552,602.13 15.92 2,438.33 MWD (3) 10,545.23 92.98 95.39 6,631.45 6,529.45 -2,274.64 2,468.27 5,967,389.19 552,632.08 11.17 2,468.27 MWD (3) 1D,575.11 88.89 96.81 6,630.96 6,528.96 -2,277.81 2,497.97 5,967,386.22 552,661.80 14.49 2,497.97 MWD (3) 10,605.55 89.33 100.52 6,631.43 6,529.43 -2,282.40 2,528.05 5,967,381.83 552,691.91 12.27 2,528.05 MWD (3) 10,635.50 89.65 104.21 6,631.65 6,529.65 -2,288.81 2,557.30 5,967,375.62 552,721.20 12.44 2,557.30 MWD (3) 10,665.23 90.03 108.76 6,631.68 6,529.68 -2,297.24 2,585.8D 5,967,367.37 552,749.75 15.32 2,585.80 MWD (3) 10,695.23 89.82 103.27 6,631.72 6,529.72 -2,305.52 2,614.63 5,967,359.29 552,778.63 18.31 2,614.63 MWD (3) 10,725.15 88.19 102.98 6,632.24 6,530.24 -2,312.31 2,643.76 5,967,352.70 552,807.80 5.53 2,643.76 MWD (3) 10,755.43 89.54 101.31 6,632.84 6,530.84 -2,318.68 2,673.36 5,967,346.53 552,837.43 7.09 2,673.36 MWD (3) 10,785.21 91.75 97.42 6,632.50 6,530.50 -2,323.52 2,702.73 5,967,341.88 552,866.84 15.02 2,702.73 MWD (3) 10,815.23 92.73 93.39 6,631.33 6,529.33 -2,326.35 2,732.59 5,967,339.25 552,896.71 13.81 2,732.59 MWD (3) 10,845.09 92.98 89.78 6,629.84 6,527.84 -2,327.17 2,762.39 5,967,338.63 552,926.52 12.10 2,762.39 MWD (3) 10,872.23 92.83 86.84 6,628.47 6,526.47 -2,326.37 2,789.48 5,967,339.61 552,953.60 10.83 2,789.48 MWD (3) 10,900.00 92.83 86.84 6,627.09 6,525.10 -2,324.84 2,817.18 5,967,341.32 552,981.28 0.00 2,817.18 PROJECTED to TD Annotation 12/20/2016 9.01:25AM Page 5 COMPASS 5000.1 Build 74 THE STATE "ALASK GOVERNOR BILL WALKER Kai Starck CTD Director ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Gil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 113-18AL3-01 ConocoPhillips Alaska, Inc. Permit to Drill Number: 216-156 Surface Location: 500' FNL, 292' FEL, Sec. 8, Tl 1N, RI OE, UM Bottomhole Location: 2868' FNL, 2369' FEL, Sec. 10, Tl 1N, RI OE, UM Dear Mr. Starck: Enclosed is the approved application for permit to redrill the above referenced service well. The permit is for a new wellbore segment of existing well Permit No. 188-110, API No. 50-103- 20097-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this J day of November, 2016. STATE OF ALASKA AL A OIL AND GAS CONSERVATION COMM JN PERMIT TO DRILL ,)n nor or, nnr 1 a. Type of Work: 1b.. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed or: Drill ❑ Lateral " ❑✓ Stratigraphic Test ❑ Development - Oil El ° Service - Winj ❑ Single Zone 0 " Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket 0 • Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180 , U 1B-18AL3-01 " 3. Address: 6. Proposed Depth: Im 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 11300- TVDS% 6574 Kuparuk River Field / Kuparuk Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 500' FNL, 292' FEL, Sec 9, Tl l N, R10E, UM ADL 25648 Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3120' FNL, 214' FEL, Sec 9, T11 N, R10E, UM ALK 466 11/19/2016 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2868' FNL, 2369' FEL, Sec 10, T1 IN, R10E, UM 2560 17730' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 102 15. Distance to Nearest Well Open Surface: x- 550147 y- 5969648 Zone -4 e GL Elevation above MSL (ft): 61.2 Ito Same Pool: 308' (113-17) 16. Deviated wells: Kickoff depth: 7950 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95.1 degrees Downhole: 3005 Surface: 2347 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 2900 7930 6712 11300 6676 N/A 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 7824' 6941' 7809' 6929' Casing Length Size Cement Volume MD TVD Conductor/Structural 78' 16" 200 sx ASI 121' 121' Surface 4215' 7-5/8" 650 sx AS] 1[, 300 sx G 4256' 4148' Intermediate Production 7783' 5"x5.5" 210 sx G 7809' 6929' Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 7131'- 7194', 7246'-7575' 6400'-6448', 6507'-6741' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis El Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑✓ 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: 11/18/2016 Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Jeff Connelly- 263-4112 be deviated from without prior written approval. Contact Email Ieff.s.con nellvCa�cop.com Printed Name Kai Starck Title CTD Director Signature Phone 263-4093 Date Commission Use Only Permit to Drill —{ �I API Number: 1 Permit Approval See cover letter for other Number: is 1p 50-®a 3—QO Date: % f Ie b requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: U v S z5C>l— Samples req'd: Yes ❑ No [✓j Mud log req'd: Yes ❑ No [� H2S measures: Yes [� No ❑ Directional svy req'd: Yes X No ❑ Spacing exception req'd: Yes ❑ No x Inclination -only svy req'd: Yes ❑ No X X_r- f Z 0 ,44C Z !� G / S— r vi,,11 "1 � Post initial injection MIT req'd: Yes ❑ No ❑ APPROVED BY / Approved by: COMMISSIONER THE COMMISSION Date: Submit Form and Form 10-401 Revised 11/2015 Thispermit is valid for 24 months from the date of approval 20 AAC 25.005 nmnw A I rm ConocoPhillips p Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 November 18, 2016 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: RECEIVED NOV 18 2016 Due to difficult faulting encountered in the drilling of the KRU 1 B-18AL1 lateral (PTD 216-109) a new lateral (1 B- 18AL3-01) will be required in order to achieve the original goals of the project. AOGCC approval is required as this is a request for an additional lateral. The 1 B-18AL3-01 lateral will target the same A4 fault blocks to the east originally targeted by the 1 B-18AL1 lateral (PTD 216-109). A 10-401 application for PTD and well -plan are attached for your review. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point for all laterals of this project including 1 B-1 8A, 1 B-18AL1, 1 B-18AL2, 1 B- 18AL3, & 1 B-18AL3-01. If you have any questions or require additional information, please contact me at 907-263-4112. Sincerely, Jeff Connelly ConocoPhillips Alaska Coiled Tubing Drilling Engineer �� ConocoPhillips ConocoPhillips (Alaska) Inc. -Kupl Kuparuk River Unit Kuparuk 113 Pad IB -18 1 B-18AL3-01 Plan: 1 B-18AL3-01_wp01 Standard Planning Report 17 November, 2016 WO BAKER HUGHES ✓ ConocoPhillips WE.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Site: Kuparuk 1 B Pad Well: 1B-18 Wellbore: 1 B-18AL3-01 Design: 1B-18AL3-01_wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1B-18 Mean Sea Level 1 B-18 @ 102.00usft True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kuparuk 1 B Pad Site Position: Northing: 5,969,646.72 usft Latitude: 70° 19'40.290 N From: Map Easting: 549,457.40 usft Longitude: 149° 35'56.056 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.38 ° Well 113-18 Well Position +N/ -S 0.00 usft Northing: 5,969,647.06 usft Latitude: 70° 19'40.248 N +E/ -W 0.00 usft Easting: 550,148.90 usft Longitude: 1490 35'35.868 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 61.20 usft Wellbore 1 B-18AL3-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2016 10/1/2016 18.01 80.96 57,551 Design 1B-18AL3-01_wp01 Audit Notes: Version: Phase: PLAN Tie On Depth: 7,930.48 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) -61.20 0.00 0.00 129.79 11/17/2016 5:10:44PM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips reA.. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Site: Kuparuk 1 B Pad Well: 1B-18 Wellbore: 1 B-18AL3-01 Design: 1 B-18AL3-01_wp01 Local Co-ordinate Reference: Well 1 B-18 TVD Reference: Mean Sea Level MD Reference: 1B-18 @ 102,00usft North Reference: True Survey Calculation Method: Minimum Curvature Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/ -S +E/ -W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100ft) (°/100ft) (°/100ft) (°) Target 7,930.48 91.53 68.60 6,610.05 -2,626.62 63.63 0.00 0.00 0.00 0.00 7,950.00 91.49 67.36 6,609.53 -2,619.30 81.72 6.35 -0.20 -6.35 -91.83 8,050.00 79.49 67.36 6,617.38 -2,581.00 173.56 12.00 -12.00 0.00 180.00 8,150.00 90.78 63.28 6,625.85 -2,539.44 263.92 12.00 11.29 -4.08 340.00 8,270.00 90.76 48.88 6,624.23 -2,472.66 363.23 12.00 -0.02 -12.00 270.00 8,470.00 90.69 72.88 6,621.65 -2,376.06 536.66 12.00 -0.03 12.00 90.00 8,590.00 90.67 58.48 6,620.22 -2,326.78 645.72 12.00 -0.02 -12.00 270.00 8,660.00 92.12 66.76 6,618.51 -2,294.62 707.80 12.00 2.07 11.82 80.00 8,750.00 86.71 57.40 6,619.43 -2,252.55 787.21 12.00 -6.00 -10.39 240.00 8,820.00 86.75 48.99 6,623.43 -2,210.72 843.11 12.00 0.05 -12.02 270.00 8,890.00 90.45 56.54 6,625.14 -2,168.42 898.78 12.00 5.29 10.78 64.00 9,010.00 77.21 62.25 6,638.02 -2,107.77 1,001.15 12.00 -11.03 4.77 157.00 9,210.00 95.83 77.49 6,650.16 -2,039.83 1,187.31 12.00 9.31 7.62 40.00 9,460.00 95.05 107.62 6,625.89 -2,050.83 1,433.02 12.00 -0.31 12.05 90.00 9,660.00 95.12 83.52 6,607.90 -2,070.03 1,629.81 12.00 0.04 -12.05 271.25 9,960.00 91.21 119.37 6,590.76 -2,128.68 1,918.51 12.00 -1.30 11.95 95.00 10,270.00 86.14 82.50 6,598.16 -2,186.56 2,217.45 12.00 -1.64 -11.90 262.00 10,570.00 92.72 117.92 6,601.23 -2,238.90 2,507.84 12.00 2.19 11.81 80.00 10,900.00 92.09 78.28 6,586.79 -2,284.40 2,827.77 12.00 -0.19 -12.01 270.00 11,300.00 91.40 126.30 6,573.82 -2,367.08 3,207.05 12.00 -0.17 12.00 90.00 11/17/2016 5:10:44PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup1 Kuparuk River Unit Kuparuk 1B Pad 1B-18 1 B-18AL3-01 1 B-18AL3-01_wp01 Travelling Cylinder Report 17 November, 2016 MAPA 0i, k I BAKER HUGHES .� Baker Hughes INTEQ r&A.. ConocoPhillips Travelling Cylinder Report BAKER HUGHES Company: ConocoPhillips (Alaska) Inc. -Kupl Project: Kuparuk River Unit Reference Site: Kuparuk 1 B Pad Site Error: 0.00 usft Reference Well: 1 B-18 Well Error: 0.00 usft Reference Wellbore 18-1 8AL3-01 Reference Design: 1 B-18AL3-01_wp01 Local Co-ordinate Reference: Well 1 B-18 TVD Reference: 1 B-18 @ 102.00usft MD Reference: 1 B-18 @ 102.00usft North Reference: True Survey Calculation Method: Minimum Curvature Output errors are at 1.00 sigma Database: OAKEDMP2 Offset TVD Reference: Offset Datum Reference 1 B-18AL3-01_wp01 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 7,930.48 to 11,300.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,325.92 usft Error Surface: Elliptical Conic Survey Tool Program Date 11/17/2016 Casing Hole Depth From To (usft) (usft) Name (usft) (usft) Survey (Wellbore) Tool Name Description 469.67 6,897.50 1 B-18 (1B-18) MWD MWD - Standard 7,392.00 7,930.48 1B-18AL3PB1 (1B-18AL3PB1) MWD MWD - Standard 7,930.48 11,300.00 1B-18AL3-01_wp01 (113-18A13-01) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name Site Name 4,256.00 4,147.97 7.625" 7-5/8 8-1/2 11,300.00 6,675.82 2 3/8" 2-3/8 3 Summary No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11117/2016 4:17:49PM Page 2 COMPASS 5000.1 Build 74 Reference Offset Centre to Measured Measured Centre Site Name Depth Depth Distance Offset Well - Wellbore - Design (usft) (usft) (usft) Kuparuk 1B Pad 1 B-04 - 1 B-04 - 18-04 1 B-05 - 1 B-05 - 1 B-05 1 B-06 - 1 B-06 - 1 B-06 1 B-07 - 1 B-07 - 1 B-07 1 B-08 - 1 B-08 - 1 B-08 1 B-08 - 1 B -08A - 1 B -08A 1 B-08 - 1 B-08ALl - 1 B-08AL1 1 B-08 - 1 B-08AL1-01 - 1 B-08AL1-01 1 B-08 - 1 B-08ALl-01 - 1 B-08AL1-01 wp07 1 B-08 - 1 B -OSA L 1 PB 1- 1 B -08A L 1 PB1 1 B-101 - 1 B-101 - 1 B-101 1 B-101 - 1 B-101 _1 - 1 B-101 _1 1 B-101 - 1 B-101 PB1 - 1 B-101 PB1 1 B-102 - 1 B-102 - 1 B-102 1B -12 -1B -12-1B-12 1 B-12 - Plan: 1 B-1 2A - 1 B-1 2A (wp01) 1 B-13 - 1 B-13 - 1 B-13 1 B-13 - 1 B -1 3L1 - 1 B-1 3L1 1 B-13 - 1 B-1312 - 1 B-131_2 1 B-14 - 1 B-14 - 1 B-14 1B -15 -1B -15-1B-15 1 B-15 - 1 B-1 5A - 1 B-1 5A 18-15 - 1B-15AL1 - 1B-15AL1 1 B-15 - 1 B-15AL2 - 1 B-15AL2 1 B-15 - 1 B-15AL2PB1 - 1 B-15AL2PB1 1 B-15 - 1 B-15AL2PB2 - 1 B-15AL2PB2 No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11117/2016 4:17:49PM Page 2 COMPASS 5000.1 Build 74 Baker Hughes INTEQ FEE.. ConocoPhillips Travelling Cylinder Report BAKER HUGHES Company: ConocoPhillips (Alaska) Inc. -Kup1 Project: Kuparuk River Unit Reference Site: Kuparuk 1 B Pad Site Error: 0.00 usft Reference Well: 1B-18 Well Error: 0.00 usft Reference Wellbore 1B-18AL3-01 Reference Design: 113- 1 8AL3-0 1 _wp0 1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 1B-18 1 B-18 @ 102.00usft 1 B-18 @ 102.00usft True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Summary Kuparuk 1 B Pad 113-17-113-17-1B-17 Reference Offset Centre to No -Go Allowable - Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Kuparuk 1 B Pad 1 B-15 - 1 B-15AL3 - 1 B-15AL3 Measured Vertical Measured Vertical Out of range 1 B-15 - 1 B-15AL3PB1 - 1 B-15AL3PB1 Tooiface+ Offset Wellbore Centre Casing- Centre to Out of range 1 B-16 - 1 B-16 - 1 B-16 Depth Depth Depth Depth Out of range 1 B-17 - 1 B-17 - 1 B-17 9,220.07 7,400.00 307.91 10.78 307.49 Pass - Minor 1/10 1 B-17 - 1 B -1 7L1 - 1 B-171_1 9,309.65 7,275.00 360.96 5.83 360.73 Pass - Minor 1/10 1 B-17 - 1 B-171_2 - 1 B-171-2 9,325.00 7,250.00 394.91 5.67 394.68 Pass - Minor 1/10 1 B-17 - 1 B-171-2-01 - 1 B-171-2-01 9,325.00 7,250.00 394.91 5.67 394.68 Pass - Minor 1/10 1 B-17 - 1 B-171-2-01 PB1 - 1 B-171-2-01 P131 9,325.00 7,250.00 394.91 5.67 394.68 Pass - Minor 1/10 1 B-18 - 1 B-18 - 1 B-18 7,950.00 6,650.00 997.25 42.46 964.38 Pass - Major Risk 1 B-18 - 1 B -18A - 1 B-1 8A 8,232.57 8,325.00 20.53 0.29 20.30 Pass - Minor 1/10 18-18 - 1 B-18AL1 - 1 B-18ALl 7,950.00 7,950.00 0.00 1.40 -0.96 FAIL - Minor 1/10 1 B-18 - 1 B-18AL1 - 1 B-18AL1_wp05 7,950.00 7,950.00 0.00 1.40 -0.96 FAIL - Minor 1/10 1 B-18 - 1 B-18AL2 - 1 B-18AL2_wp02 7,950.00 6,650.00 997.25 130.42 892.26 Pass - Major Risk 1 B-18 - 1 B-18AL3 - 1 B-18AL3_wp05 7,949.85 7,950.00 2.97 1.31 2.75 Pass - Minor 1/10 1 B-18 - 1B-18AL3PB1 - 1B-18AL3PB1 7,950.00 7,950.00 0.00 1.40 -0.96 FAIL- Minor 1/10 1 B-19 - 1 B-19 - 1 B-19 9,100.03 6,753.50 6,275.00 5,896.02 30.85 Out of range 1 B-19 - 1 B-191-1 - 1 B-191-1 .1,275.47 851.00 5 1,192.50 10.23 Out of range 1 B-19 - 1 B -1 9L1-01 - 1 B -1 9L1-01 6,754.01 6,300.00 5,916.88 30.85 28.61 Out of range 1 B-19 - 1 B-191-1-02 - 1 B-191_1-02 858.87 5 1,168.43 10.26 1,168.01 Pass- Minor 1/10 Out of range WSW -01 - WSW -01 - WSW -01 6,325.00 5,937.75 30.86 28.74 25.85 Out of range WSW -02 - WSW -02 - WSW -02 5 1,144.38 10.28 1,143.96 Pass - Minor 1/10 9,120.20 Out of range WSW -03 - WSW -03 - WSW -03 5,958.67 30.86 28.87 26.06 -1,309.31 Out of range WSW -04 - WSW -04 - WSW -04 1,120.35 10.30 1,119.94 Pass - Minor 1/10 9,126.37 6,754.98 Out of range WSW -05 - WSW -05 - WSW -05 30.86 29.01 26.23 -1,320.53 882.42 Out of range Offset Design Kuparuk 1 B Pad 113-17-113-17-1B-17 - Offset Site Error: 0.00 usft Survey Program: 60 -GCT -MS, 7427 -CB -GYRO -SS Rule Assigned: Minor 1/10 Offset Well Error: 0.00 usft Reference offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Tooiface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Azimuth +N/hS +E/ -W Hole Size Centre Distance Deviation (usft) (usft) (usft) (usft) (usft) (usft) (") (usft) (usft) (") (usft) (usft) (usft) 9,060.25 6,749.15 6,150.00 5,792.09 30.86 27.82 23.58 -1,218.14 811.79 5 1,313.13 10.11 1,312.72 Pass - Minor 1/10 9,068.87 6,750.31 6,175.00 5,812.85 30.85 27.95 23.99 -1,229.68 819.59 5 1,288.98 10.13 1,288.57 Pass - Minor 1/10 9,077.16 6,751.31 6,200.00 5,833.60 30.85 28.08 24.37 -1,241.20 827.44 5 1,264.84 10.16 1,264.42 Pass - Minor 1/10 9,085.09 6,752.17 6,225.00 5,854.39 30.85 28.21 24.73 -1,252.67 835.28 5 1,240.71 10.19 1,240.29 Pass- Minor 1/10 9,092.68 6,752.89 6,250.00 5,875.19 30.85 28.34 25.05 -1,264.12 843.12 5 1,216.59 10.21 1,216.17 Pass - Minor 1/10 9,100.03 6,753.50 6,275.00 5,896.02 30.85 28.48 25.35 .1,275.47 851.00 5 1,192.50 10.23 1,192.08 Pass - Minor 1/10 9,107.06 6,754.01 6,300.00 5,916.88 30.85 28.61 25.62 -1,286.79 858.87 5 1,168.43 10.26 1,168.01 Pass- Minor 1/10 9,113.80 6,754.42 6,325.00 5,937.75 30.86 28.74 25.85 -1,298.07 866.75 5 1,144.38 10.28 1,143.96 Pass - Minor 1/10 9,120.20 6,754.73 6,350.00 5,958.67 30.86 28.87 26.06 -1,309.31 874.57 5 1,120.35 10.30 1,119.94 Pass - Minor 1/10 9,126.37 6,754.98 6,375.00 5,979.58 30.86 29.01 26.23 -1,320.53 882.42 5 1,096.35 10.33 1,095.93 Pass - Minor 1/10 9,132.32 6,755.15 6,400.00 6,000.44 30.87 29.14 26.38 -1,331.81 890.34 5 1,072.35 10.36 1,071.94 Pass - Minor 1/10 9,138.04 6,755.27 6,425.00 6,021.15 30.87 29.27 26.52 -1,343.30 898.35 5 1,048.32 10.38 1,047.91 Pass - Minor 1/10 9,143.57 6,755.33 6,450.00 6,041.71 30.88 29.41 26.64 -1,354.98 906.44 5 1,024.26 10.41 1,023.84 Pass - Minor 1110 9,148.90 6,755.34 6,475.00 6,062.20 30.88 29.54 26.75 -1,366.76 914.59 5 1,000.20 10.43 999.78 Pass- Minor 1/10 9,154.07 6,755.31 6,500.00 6,082.68 30.89 29.68 26.83 -1,378.55 922.76 5 976.16 10.46 975.74 Pass - Minor 1/10 9,159.08 6,755.23 6,525.00 6,103.17 30.90 29.81 26.88 -1,390.30 930.95 5 952.16 10.48 951.74 Pass - Minor 1/10 9,163.93 6,755.12 6,550.00 6,123.67 30.90 29.95 26.90 -1,402.02 939.15 5 928.20 10.50 927.78 Pass - Minor 1/10 9,168.62 6,754.98 6,575.00 6,144.18 30.91 30.08 26.88 -1,413.72 947.37 5 904.28 10.52 903.86 Pass - Minor 1/10 CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 11/17/2016 4:17:49PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips Project: Kuparuk River Unit Axl muthstoTrue Narlh Magnetic North: 18.01° WELLBORE DETAILS: 1B-18AL3-01 REFERENCE INFORMATION Site: Kuparuk lB Pad 113-18 +NAS +E/ -W Well: IB -18 Easting Magnetic Field Parent Wellbore: 1B-18AL3PB1 Co-ordinate, NIE)Reference: Well 1B-18, True North Wellbore:1B-18AL3-01 5969647.06 Strength: 57550 7.,,T Dip Arigle:99.98' Tie on MD: 7930.48 Vertical TVD) Reference: Mean See Level SectionlVS)Reference:Slot-(O.00N,O.00E) Plan: 16.18AL3.01 w 01 113.18/16-18AL3-01 p ( 35' 35.868 W del:Da BGGM2016 Model: BGGM2016 MD Measured Depth Reference: 1B-18 102.00us}I Azi TVDSS +N/ -S +E/ -W Calculation Method: Minimum Curvature 600 610 > 620 � 630 O O 640 ¢ 650 d) Q 660 U 670 tU 680 690 700 Mean SW 251 -25( -50( -75( loo( ,lzs( 0 N-150( X175( -200( x-225( -250( -2750 -3000 -3250 �/.Pit- I BAKER HUGHES WELL DETAILS: 113-18 +NAS +E/ -W Northing Easting Latitude Longitude 0.00 0.00 5969647.06 550148.90 70° 19' 40.248 N 149° 35' 35.868 W Sec MD Inc Azi TVDSS +N/ -S +E/ -W Dleg TFace VSect Annotation 1 7930.48 91.53 68.60 6610.05 -2626.62 63.63 0.00 0.00 1730.03 TIP 2 7950.00 91.49 67.36 6609.53 -2619.30 81.72 6.35 -91.83 1739.24 KOP 3 8050.00 79.49 67.36 6617.38 -2581.00 173.56 12.00 180.00 1785.29 Start 12 dls 4 8150.00 90.78 63.28 6625.85 -2539.44 263.92 12.00 340.00 1828.12 4 5 8270.00 90.76 48.88 6624.23 -2472.66 363.23 12.00 270.00 1861.68 5 6 8470.00 90.69 72.88 6621.65 -2376.06 536.66 12.00 90.00 1933.11 6 7 8590.00 90.67 58.48 6620.22 -2326.78 645.72 12.00 270.00 1985.36 7 8 8660.00 92.12 66.76 6618.51 -2294.62 707.80 12.00 80.00 2012.48 8 9 8750.00 86.71 57.40 6619.43 -2252.55 787.21 12.00 240.00 2046.56 9 10 8820.00 86.75 48.99 6623.43 -2210.72 843.11 12.00 270.00 2062.75 10 11 8890.00 90.45 56.54 6625.14 -2168.42 898.78 12.00 64.00 2078.44 11 12 9010.00 77.21 62.25 6638.02 -2107.77 1001.15 12.00 157.00 2118.29 12 13 9210.00 95.83 77.49 6650.16 -2039.83 1187.31 12.00 40.00 2217.83 13 14 9460.00 95.05 107.62 6625.89 -2050.83 1433.02 12.00 90.00 2413.67 14 15 9660.00 95.12 83.52 6607.90 -2070.03 1629.81 12.00 271.25 2577.16 15 16 9960.00 91.21 119.37 6590.76 -2128.68 1918.51 12.00 95.00 2836.51 16 17 10270.00 86.14 82.50 6598.16 -2186.56 2217.45 12.00 262.00 3103.24 17 18 10570.00 92.72 117.92 6601.23 -2238.90 2507.84 12.00 80.00 3359.87 18 19 10900.00 92.09 78.28 6586.79 -2284.40 2827.77 12.00 270.00 3634.80 19 20 11300.00 91.40 126.30 6573.82 -2367.08 3207.05 12.00 90.00 3979.14 Planned TD at 11300.00 600 610 > 620 � 630 O O 640 ¢ 650 d) Q 660 U 670 tU 680 690 700 Mean SW 251 -25( -50( -75( loo( ,lzs( 0 N-150( X175( -200( x-225( -250( -2750 -3000 -3250 �/.Pit- I BAKER HUGHES ---- ---- ---- ---- ---- ---- - - - - - - - - - - - - - - - - - - - - wtuV YLVV 4JUV -V 4�VU 4(1()U 4/00 Vertical Section at 129.79° (100 usft/in) i0 West( -)/East(+) (250 usft/in) 1 -18A Faul 1 -18/1 1.18A 3 13-17/1 -l7L 0•JP.B B-17/ B-17 1B- 7/IB', 7L2 IB -18/ B-18 F I -1811 -1 LI 113- 7t1 B- 171, 111- 18/1 -18A - 1 18AL -O] T)1 1 `I 1 -18113-18 Ll o 9 16 IB 1911B LRAT 3PE11 4- 000 B-17/ B -17L -0 PE 1 A Start 12 dls Ti OP 113 18/113 ] 8 Plan ed TD at 113 10.00 ]B-1 Fau t] - 113-18 L1 F ultl ---- ---- ---- ---- ---- ---- - - - - - - - - - - - - - - - - - - - - wtuV YLVV 4JUV -V 4�VU 4(1()U 4/00 Vertical Section at 129.79° (100 usft/in) i0 West( -)/East(+) (250 usft/in) ) 1 -17/1 -17L2 F o B-17/ B -17L -0 PE 1 A 1 -17/1 1- -- 1 - p) IB -18/ B-18 L2 16-1 'lB-1 J 113-19/111-1 ALl ] -18/IE -18AL1- IB -19 /113-1A 1 18/IB 18AL TIP i •'i,,, .•., ..,,, _ ,., '.,.,..- P antietl at 1300.0 O j q 5 6 8 91 1 12 �'- 14 •1 13'", B-18/ B-18 L3-01 to s IB -16/1B -18:1L3 Bl I IB- 8/18- 8I 17/IB 17 i 113 18 _Faul2 113-1 A 1 aultl 900 1000 1100 1200 1300 1400 1500 1600 1700 1Rnn 14n0 7nnn Zinn o?nn oznn 'nnn 1- 1< 1 I'll ---- ---- ---- ---- ---- ---- - - - - - - - - - - - - - - - - - - - - wtuV YLVV 4JUV -V 4�VU 4(1()U 4/00 Vertical Section at 129.79° (100 usft/in) i0 Schwartz, Guy L (DOA) From: Sent: To: Cc: Subject: Attachments: Guy and Victoria, Connelly, Jeff <Jeff.S.Connelly@conocophill ips.com> Friday, November 18, 2016 8:32 AM Schwartz, Guy L (DOA); Loepp, Victoria T (DOA) Starck, Kai; Eller, J Gary; Ohlinger, James J; Burke, Jason; Phillips, Ron L; Callahan, Mike S; Herring, Keith E; Long, William R; Connelly, Jeff, Nabors CDR2 Company Man; Starns, Ted C; Little, Laird D.; Neely, Thomas G; Gieryic, Steve M Authorization to Continue Drilling, KRU 1B-18AL3-01 (new lateral) 1B-18AL3-01_wp01 VPO - NAD27.pdf, 1B-18 Spider ZoomOut .pdf, 1B-18AL3-01 10-401.pdf, 1B-18AL3-01_wp01 SPR - NAD27.pdf, 1B-18AL3-01_wp01 TCR - NAD27.pdf Request for Authorization to Continue Drilling, KRU 1 B-18AL3-01 (new lateral) Due to difficult faulting encountered in the drilling of the KRU 1 B-18AL1 lateral (PTD 216-109) a new lateral (KRU 1 B-18AL3-01) will be required in order to achieve the original goals of the project. AOGCC approval is required as this is a request for an additional lateral. The KRU 1 B-18AL3-01 lateral will target the same A4 fault blocks to the east originally targeted by the 1 B-18AL1 lateral (PTD 216-109). A 10-401 application for PTD and well -plan are attached for your review. Additionally, a hard copy of this documentation is prepared and should arrive at your offices shortly. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point for all laterals of this project including 1 B-1 8A, 1 B-18AL1, 1 B-18AL2, 1 B- 18AL3, & 1 B-18AL3-01. If you have any questions or require additional information, please contact me at 907-263-4112. Regards, Jeff Connelly Associate CTD Engineer 907-263-4112 (Office) 1907-328-8854 (Mobile) 700 G Street, ATO 662 Jeff.S.Connelly@conocophillips.com 'fv" onoc Phillips XaSka TRANSMITTAL LETTER CHECKLIST WELL NAME: PTD: Development Service Exploratory Strati ra hic Test Non -Conventional — p — — p �' — g p — FIELD: l� (l�l� t V POOL: of Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. _10 API No. 50-�W.'q - 2R -Q-_g6 . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -) from records, data and logs acquired for well (name onpermit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 Well Name: KUPARUK RIV UNIT 1B-18AL3-01 Program DEV_ Well bore seg PTD#: 2161560 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 17 -Nonconven. gas conforms to AS31.05.030Q.1.A),(j.2.A-D) - - - - - - - - - - - - - _NA_ 1 Permit fee attached_ -- NA 2 Leasenumberappropriate_ - - - - - . --------- Yes _ - - ADL0025648, entire wellbore_ --- --------- 3 -Unique well - - - - - - - - - - - - - - - - - Yes_ - KRU 1 B-18AL3-01 _ 4 Well located in-a_defined-pool- - - - - ------- Yes - - - KUPARUK RIVER,.KUP_ARUK_RIV OIL--4901.00,_governed_by Conservation_Order_N_o. 432D._ 5 Well -located proper distance from drilling unit- boundary- - - Yes - - - - - - - CO 432D contains no spacing restrictions with respect to drilling unit boundaries. - - - - - - - - - - 6 Well located proper distance from other wells- _ - - - - - - Yes CO 432D has no interwell_spacing-restriction_s._ 7 Sufficient acreage. avail_able in-dril_ling unit_ - _ - --- Yes . - - - ----------- 8 -if-deviated, is -wellbore plat included - - - - Yes . . 9 Operator only affected party - - - - - - - - - - - - - - - - Yes- Wellbore -will be more than 500' from an external property line where_ ownership or landownership changes. 10 Operator hasappropriatebond in force - - - - - - - - - - Yes Appr Date 11 Permit -can be issued without conservation order- - - - Yes - - - - - - - - - - - - - - - - - - - - - - -- - - - - - 12 -P - ermitcan be issued without ad ministrative_approval - Yes PKB 11/18/2016 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 13 Cn permit be approved before 15 -day wait_ - - Yes - - - 14 Well located within area and -strata authorized by Injection Order # (put_ 10# in comments) (For_ NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 All wells -within -1/4_mile_area_of review identified (For service well only)_ - - - - NA 16 Pre -produced injector, duration -of pre production less than 3 months_ (For -service well only) NA- - - - - - - - - - - - - - - - 18 Conductor string -provided - - - - - - - - - N_A- - - - Con-ductor set-in 113-118A Engineering 19 Surface casing_ protects all known USDWs - - - - ---- ---- NA - - _ _ - - - - Surface casing set in -1_B_ -18A_ - -- - - -- - -- -- -- 20 CMT vol adequate -to circulate- on conductor & surf_csg - - - _ - - - - - - - .. NA_ - - - - - - - _ 21 CMT vol adequate to tie -in -long string to surf csg------------ - - - _NA_ Production casing set - - - - - - - - - - - - - 22 CMT -will coverall known _productive horizons_ - - - Yes - - - - - - 2 3/8" slotted liner will be placed in lateral. No cement or -swell packers._ - - - - - 23 -Casing designs adequate for CJ, B &_ permafrost _ - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - 24 Adequate_tankage-or reserve pit _ ---- ----- Yes Rig has steel pits, All waste to_approved disposal_wells.--------- 25 _If_a_re-drill_, has. a 1.0-403 for abandonment been approved - - _ _ _ Yes - _ _ - _ - _ Sundry_316-416 to _P & A_1B-18_(PTD 194-0.61)_ - - - - - 26 Adequate wellbore separation_ proposed- - - - - - - - - . - Yes - - - _ _ - - Anti_col_lission data supplied. -No issues PP - 27 If_diverter required, does it meet_ regulations_ - - - - _ - NA- - _ - - _ - - Well head in_ place._ BOPE will be placed tree. P -- - Appr Date 28 Drilling fluid_ program schematic -& equip list _adequate _ - - - - _ ----------------- Yes Max formation_ press= 3005psi ( 9.0 PPG_EMW)_Will drill 8.6_ ppg mud and maintain BHP with _M_PD. GLS 11/18/2016 29 BOPEs,-dotheymeetregu_lation - - - - - - - - - -- - - - - - - - - - - - - - Yes- - - - - - - - - - - - - -- - - -- - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - - 30 BOPE_press rating appropriate; test to -(put prig in comments)_ - _ - - - - - - - - Yes - - - - - - - MASP = 2437_psi-(will test ROPE 3500 psi )- - - - - - - - - - - - - - - 31 Chokemanifoldcomplies w/API_RP-53 (May 84)_ - - - _ - - - - - Yes - - - - - _ _ 32 Work will occur without operation shutdown_ - - - _ - - _ _ - - - - - - - - - - - - - - Yes 33 Is presence- of H2S gas_ probable _ _ - - - - - - - .- Yes - - - - - - - H2S in area. _ Righas sensors and_ alarms.- - 34 Mechanical_ condition of wells within AOR verified (For_service well on - NA- - ------------- 35 Permit -can be issued w/o hydrogen_ sulfide measures - - - - - _ - - No Wellsonare_H2S-bearing. H2S measures required - _ - - - Geology 36 Data- presented on potential overpressure zones _ - - - - - _ - - - _ _ _ _ Yes _ _ _ _ _ - - Expected r_eservoirpressu_re is 9.0_ppg EMW; will -be drilled using 8.6 ppg mud_ and MPD technique. Appr Date 37 Seismic analysis_ of shallow gas -zones- - - - _ - - - N_A_ - - - - - - . - - - - - - - - - - - - - PKB 11/18/2016 38 Seabed condition survey -(if off_ -shore) - - - - - - - - - - - - - NA. _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - _ _ - - - - - - - - - - - - - - - - - - 39 Contact name/phone for weekly_ progress reports- [exploratory only] _ to NA_ Onshore development lateral be drilled. - - - - Geologic Engineering Public Commissioner: Date: Commissioner: Date C i . Date