HomeMy WebLinkAbout216-156DATA SUBMITTAL COMPLIANCE REPORT
3/13/2017
Permit to Drill 2161560 Well Name/No. KUPARUK RIV UNIT 1B-18AL3-01 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-63-00
MD 10900 TVD 6627 Completion Date 12/14/2016 Completion Status 1 -OIL
REQUIRED INFORMATION
Mud Log No Ix, Samples No v/
DATA INFORMATION
Types Electric or Other Logs Run: GR/Res
Well Log Information:
Log/
Interval
Electr
Scale Media No
—
Data
Digital
Dataset
Type
Med/Frmt
Number Name
ED
C
27867
Digital Data
ED
C
27867
Digital Data
Log
C
27867
Log Header Scans
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
ED
C
27928
Digital Data
AOGCC
Current Status 1 -OIL UIC No
Directional Survey Yes
(data taken from Logs Portion of Master Well Data Maint)
Log Log Run
Interval
OH /
Scale Media No
—
Start Stop
—
CH Received
1/6/2017
1/6/2017
0 0
6920 10900
1/18/2017
1/18/2017
1/18/2017
1/18/2017
1/18/2017
IP 1/18/2017
1/18/2017
1/18/2017
1/18/2017
1/18/2017
1/18/2017
1/18/2017
1/18/2017
Page 1 of 3
Comments
Electronic File: 1 B-18AL3-01 EOW - NAD27.pdf ,
Electronic File: 1 B-18AL3-01 EOW - NAD27.txt
2161560 KUPARUK RIV UNIT 1B-18AL3-01
LOG HEADERS
Electronic Data Set, Filename: 1 B-18AL3-01
GAMMA RES.Ias
Electronic File: 1 B-18AL3-01 2MD Final '
Logs.cgm
Electronic File: 1 B-18AL3-01 51VID Final
Logs.cgm
Electronic File: 1 B-18AL3-01 5TVDSS Final
Logs.cgm
Electronic File: 1B-18AL3-01 2MD Final Logs.pdf
Electronic File: 1B-18AL3-01 5MD Final Logs.pdf
Electronic File: 1 B-18AL3-01 5TVDSS Final'
Logs.pdf
Electronic File: 1 B-18AL3-01 EOW - NAD27.pdf
Electronic File: 1 B-18AL3-01 EOW - NAD27.txt
Electronic File: 1 B-18AL3-01 Final Surveys TD
10900 Confirmed.csv
Electronic File: 1 B-18AL3-01 Survey Listing.txt
Electronic File: 1 B-18AL3-01 Surveys.txt
Electronic File: 1 B-18AL3-
01 _25_tapescan_B H I_CTK.txt
Monday, March 13, 2017
DATA SUBMITTAL COMPLIANCE REPORT
3/13/2017
Permit to Drill
2161560 Well Name/No. KUPARUK RIV UNIT 1B-18AL3-01 Operator CONOCOPHILLIPS ALASKA INC API No. 50-029-22472-63-00
MD
10900
TVD 6627 Completion Date 12/14/2016
Completion Status 1 -OIL Current Status 1 -OIL UIC No
ED
C
27928 Digital Data
1/18/2017
Electronic File: 1B-18AL3-
01 _5_tapesca n_B H I_CT K.txt
ED
C
27928 Digital Data
1/18/2017
Electronic File: 1B-18AL3-01_output.tap'
ED
C
27928 Digital Data
1/18/2017
Electronic File: 1B-18AL3-01 2MD Final Logs.tif '
ED
C
27928 Digital Data
1/18/2017
Electronic File: 16-18AL3-01 5MD Final Logs.tif
ED
C
27928 Digital Data
1/18/2017
Electronic File: 1 B-18AL3-01 5TVDSS Final -
Logs.tif
Log
C
27928 Log Header Scans
0 0
2161560 KUPARUK RIV UNIT 1B-18AL3-01
LOG HEADERS
Well Cores/Samples
Information:
Name
INFORMATION RECEIVED
Completion Report Y
Production Test Informatio Y NA
Geologic Markers/Tops Y
COMPLIANCE HISTORY
Completion Date: 12/14/2016
Release Date: 11/18/2016
Description
Comments:
Interval
Start Stop
Directional / Inclination Data
Mechanical Integrity Test Information Y NA
Daily Operations Summary y
Date Comments
AOGCC Page 2 of 3
Sample
Set
Sent Received Number Comments
Mud Logs, Image Files, Digital Data Y Core Chips Y
Composite Logs, Image, Data Files (�) Core Photographs Y
Cuttings Samples Y /NA Laboratory Analyses Y /
Monday, March 13, 2017
DATA SUBMITTAL COMPLIANCE REPORT
3/13/2017
Permit to Drill 2161560 Well Name/No. KUPARUK RIV UNIT 1 B-18AL3-01 Operator CONOCOPHILLIPS ALASKA INC
API No.
50-029-22472-63-00
MD 10900 TVD 62 Com letion ate 1 14/2016
Completion Status 1-0IL Current Status I
UIC No
Compliance Reviewed By: _
Date:
AOGCC Page 3 of 3 Monday, March 13, 2017
RECF6VED43z)tt-.jzkr.-td'f znq?-z
WE&6 JAN 18 2017 PRINT DISTRIBUTION LIST
BAKER
HUGHES
FIELD
FINAL
AO GCC
COMPANY
ConocoPhillips Alaska, Inc.
LOGS
WELL NAME
1B-18AL3-01
Surveys
FIELD
Prudhoe Bay Unit
COUNTY
North Slope Borough
# OF COPIES
BHI DISTRICT
Alaska
AUTHORIZED BY
Patrick Rider
EMAIL
Patrick. Rider(a)bakerhughes.com
STATUS Final Replacement
Please sign and return one copy of this transmittal form to:
ConocoPhillips Alaska, Inc.
Tom Osterkamp DATA LOGGED
700 G Street. 2-/ x/201 7
M. K. BENDEr,
Anchorage, Alaska 99510
to acknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE December 7, 2016
TODAYS DATE January 16, 2017
Revision
No Details:
Requested by:
COMPANY
FIELD
FINAL
CD
CD
LOGS
LOGS
(digital/image)
Surveys
1#(FinalSurveys)
PERSON ATTENTION
# OF COPIES
OF COPIE
# OF COPIES
COMPANY
FIELD
FINAL
CD
CD
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BO$
PERSON ATTENTION
# OF PRINTS
# OF 1'KIN I S
# OF COPIES
1 FBP North Slope
0
0
0
EOA, PBOC,PRB-20 (Office 109)
D&C Wells Project Aids Agatha Rutka & Barbara Glassmaker
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
0
0
0
IAttn: Ricky Elgaricio
ATO 3-344
700 G Street
Anchorage, AK 99510
3 I ExxonMobil, Alaska
0
0
0
Attn: Lvnda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4I State of Alaska - AOGCC
1
1
1
Attn: Makana Bender
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ***
0
1
1
Attn: Resource Evaluation
5.50 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
1
1
1
Petrotechnical Data Center, LR2-I
900 E. Benson Blvd.
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE:
0
2
3
3
0
0
TOTALS FOR ALL PAGES:
0
2
3
3
0
0
21 6156
27928
ConocoPp
hilli s RECEIVED
JAN 18 2017
AOGCC
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1B Pad
1 B-18AL3-01
50-029-22472-63
Baker Hughes INTEQ WMA a I
Definitive Survey Report HUGHES
20 December, 2016
` ConocoPhillips /Gill
BAKER
ConocoPhillips Definitive Survey Report HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Project:
Kuparuk River Unit
Site:
Kuparuk 1 B Pad
Well:
113-18
Wellbore:
1 B-18AL3-01
Design:
1 B-18AL3-01
Project
Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution) System Datum
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Alaska Zone 04
Well 113-18
Local Co-ordinate Reference:
Well 1 B-18
TVD Reference:
1 B-18 @ 102.00usft
MD Reference:
1 B-18 @ 102.00usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM Alaska NSK Sandbox
Well Position
+N/ -S 0.00 usft
Northing:
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
1 B-18AL3-01
Date 12/16/2016
Magnetics
Model Name
Sample Date
(usft)
BGGM2016
10/1/2016
Design
1 B-18AL3-01
1B -18(1B-18)
Audit Notes:
8,350.60
1B-18AL3PB1 (113-18AL3PI31)
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
5, 969, 647.06 usft
550,148.90usft
usft
Declination
(I
18.01
Version: 1.0 Phase: ACTUAL Tie On Depth: 8,350.60
Vertical Section:
+E/ -W
Depth From (TVD)
(usft)
(usft)
(1)
40.80
Survey Program
90.00
Date 12/16/2016
From
To
Survey
(usft)
(usft)
Survey (Wellbore)
469.67
6,897.50
1B -18(1B-18)
7,392.00
8,350.60
1B-18AL3PB1 (113-18AL3PI31)
8,387.00
10,872.23
1B-18AL3-01 (1 B-1 8AL3-01)
12/20/2016 9:01:25AM
Latitude:
Longitude:
Ground Level:
Dip Angle
V)
80.96
70° 19'40.248 N
149° 35' 35.868 W
61.20 usft
Field Strength
(nT)
57.551
+N/ -S
+E/ -W
Direction
(usft)
(usft)
(1)
0.00
0.00
90.00
Survey
Survey
Tool Name
Description
Start Date
End Date
MWD
MWD - Standard
4/28/1994
4/28/1994
MWD
MWD - Standard
11/5/2016
11/11/2016
MWD
MWD - Standard
11/21/2016
11/25/2016
Page 2
COMPASS 5000.1 Build 74
101,
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Well 113-18
Project: Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site: Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft
Well: 1B-18
North Reference:
True
Wellbore: 1B-18AL3-01
Survey Calculation Method:
Minimum Curvature
Design: 1 B-18AL3-01
Database:
EDM Alaska NSK Sandbox
Survey
F/.%®
BAKER
HUGHES
12120/2016 9:01:25AM Page 3 COMPASS 5000.1 Build 74
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+Nl-S
+E/ -W
Northing
Fasting
DLS
Section Survey Tool Name Annotation
(usft)
V)
(I
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(01100')
(ft)
8,350.60
89.39
57.58
6,696.47
6,594.47
-2,412.00
422.76
5,967,238.17
550,587.73
1.42
422.76 MWD (2) TIP
8,387.00
86.17
56.06
6,697.88
6,595.88
-2,392.10
453.20
5,967,258.27
550,618.03
9.77
453.20 MWD (3) KOP
8,415.79
83.97
61.38
6,700.36
6,598.36
-2,377.21
477.70
5,967,273.32
550,642.43
19.93
477.70 MWD (3)
8,445.81
84.71
66.94
6,703.32
6,601.32
-2,364.20
504.57
5,967,286.52
550,669.22
18.59
504.57 MWD (3)
8,475.55
88.13
71.09
6,705.18
6,603.18
-2,353.57
532.28
5,967,297.32
550,696.84
18.06
532.28 MWD (3)
8,505.49
88.62
76.20
6,706.03
6,604.03
-2,345.15
560.99
5,967,305.94
550,725.49
17.14
560.99 MWD (3)
8,535.22
92.06
76.46
6,705.85
6,603.85
-2,338.12
589.87
5,967,313.16
550,754.32
11.60
589.87 MWD (3)
8,565.47
95.87
73.40
6,703.76
6,601.76
-2,330.28
619.00
5,967,321.19
550,783.40
16.14
619.00 MWD (3)
8,595.44
94.76
68.59
6,700.98
6,598.98
-2,320.57
647.21
5,967,331.10
550,811.54
16.40
647.21 MWD (3)
8,625.50
94.37
64.18
6,698.59
6,596.59
-2,308.57
674.65
5,967,343.28
550,838.90
14.68
674.65 MWD (3)
8,655.37
94.09
59.81
6,696.38
6,594.38
-2,294.58
700.95
5,967,357.44
550,865.10
14.62
700.95 MWD (3)
8,685.47
92.40
56.22
6,694.68
6,592.68
-2,278.67
726.43
5,967,373.52
550,890.47
13.16
726.43 MWD (3)
8,715.22
89.69
53.75
6,694.14
6,592.14
-2,261.60
750.79
5,967,390.75
550,914.71
12.32
750.79 MWD (3)
8,745.15
86.99
51.70
6,695.00
6,593.00
-2,243.48
774.59
5,967,409.02
550,938.39
11.32
774.59 MWD (3)
8,775.29
84.06
49.34
6,697.36
6,595.36
-2,224.38
797.78
5,967,428.27
550,961.45
12.47
797.78 MWD (3)
8,805.40
84.56
53.07
6,700.34
6,598.34
-2,205.62
821.13
5,967,447.19
550,984.67
12.44
821.13 MWD (3)
8,835.07
84.69
57.56
6,703.12
6,601.12
-2,188.81
845.41
5,967,464.16
551,008.84
15.07
845.41 MWD (3)
8,865.19
83.82
63.04
6,706.14
6,604.14
-2,173.97
871.43
5,967,479.18
551,034.76
18.33
871.43 MWD (3)
8,895.15
84.65
67.64
6,709.15
6,607.15
-2,161.53
898.52
5,967,491.79
551,061.76
15.53
898.52 MWD (3)
8,925.25
84.03
66.55
6,712.12
6,610.12
-2,149.88
926.11
5,967,503.63
551,089.26
4.15
926.11 MWD (3)
8,955.01
84.16
62.54
6,715.18
6,613.18
-2,137.16
952.83
5,967,516.53
551,115.90
13.41
952.83 MWD (3)
8,985.36
84.93
57.88
6,718.07
6,616.07
-2,122.15
979.04
5,967,531.71
551,142.01
15.49
979.04 MWD (3)
9,015.81
86.28
59.49
6,720.40
6,618.40
-2,106.37
1,004.98
5,967,547.66
551,167.84
6.89
1,004.98 MWD (3)
9,045.49
88.00
63.33
6,721.88
6,619.88
-2,092.19
1,031.00
5,967,562.01
551,193.76
14.16
1,031.00 MWD (3)
9,075.07
88.10
67.53
6,722.89
6,620.89
-2,079.90
1,057.88
5,967,574.48
551,220.56
14.19
1,057.88 MWD (3)
9,105.53
87.76
71.54
6,723.99
6,621.99
-2,069.26
1,086.39
5,967,585.31
551,248.99
13.20
1,086.39 MWD (3)
9,137.69
87.23
76.39
6,725.40
6,623.40
-2,060.39
1,117.26
5,967,594.39
551,279.80
15.16
1,117.26 MWD (3)
9,165.61
88.03
79.82
6,726.55
6,624.55
-2,054.64
1,144.56
5,967,600.32
551,307.05
12.60
1,144.56 MWD (3)
9,195.50
68.62
83.94
61727.43
6,625.43
-2,050.42
1,174.13
5,967,604.73
551,336.59
13.92
1,174.13 MWD (3)
9,228.61
90.15
90.27
61727.78
6,625.78
-2,048.75
1,207.18
5,967,606.62
551,369.62
19.67
1,207.18 MWD (3)
12120/2016 9:01:25AM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips IMA ha
ConocoPhillips Definitive Survey Report BHUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup1
Local Co-ordinate Reference:
Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference:
1 B-18 @ 102.00usft
Well:
1B-18
North Reference:
True
Wellbore:
1 B-18AL3-01
Survey Calculation Method:
Minimum Curvature
Design:
1 B-18AL3-01
Database:
EDM Alaska NSK Sandbox
Survey
12120/2016 9:01:25AM Page 4 COMPASS 5000.1 Build 74
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Eastin g
DLS
Section
Survey Tool Name Annotation
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100')
(ft)
9,255.25
93.93
92.00
6,726.83
6,624.83
-2,049.28
1,233.79
5,967,606.28
551,396.24
15.60
1,233.79
MWD (3)
9,285.30
98.82
93.55
6,723.50
6,621.50
-2,050.72
1,263.61
5,967,605.03
551,426.06
17.06
1,263.61
MWD (3)
9,315.59
99.69
97.27
6,718.63
6,616.63
-2,053.54
1,293.36
5,967,602.41
551,455.83
12.46
1,293.36
MWD (3)
9,345.41
99.47
102.87
6,713.66
6,611.66
-2,058.68
1,322.30
5,967,597.47
551,484.80
18.53
1,322.30
MWD (3)
9,375.52
100.66
108.44
6,708.39
6,606.39
-2,066.67
1,350.84
5,967,589.67
551,513.39
18.64
1,350.84
MWD (3)
9,405.68
100.03
113.24
6,702.97
6,600.97
-2,077.22
1,378.56
5,967,579.30
551,541.18
15.79
1,378.56
MWD (3)
9,435.55
95.69
111.92
6,698.89
6,596.89
-2,088.58
1,405.87
5,967,568.13
551,568.56
15.17
1,405.87
MWD (3)
9,465.58
95.16
108.97
6,696.05
6,594.05
-2,099.02
1,433.88
5,967,557.87
551,596.64
9.94
1,433.88
MWD (3)
9,495.69
95.22
106.22
6,693.33
6,591.33
-2,108.08
1,462.46
5,967,549.00
551,625.28
9.10
1,462.46
MWD (3)
9,525.45
95.63
101.51
6,690.51
6,588.51
-2,115.18
1,491.22
5,967,542.10
551,654.08
15.82
1,491.22
MWD (3)
9,555.61
92.92
100.22
6,688.26
6,586.26
-2,120.85
1,520.75
5,967,536.63
551,683.64
9.95
1,520.75
MWD (3)
9,585.45
93.41
100.18
6,686.62
6,584.62
-2,126.13
1,550.07
5,967,531.55
551,713.00
1.65
1,550.07
MWD (3)
9,615.41
94.39
105.31
6,684.58
6,582.58
-2,132.72
1,579.22
5,967,525.15
551,742.18
17.39
1,579.22
MWD (3)
9,645.47
91.69
107.04
6,682.98
6,580.98
-2,141.08
1,608.04
5,967,516.98
551,771.06
10.66
1,608.04
MWD (3)
9,675.23
90.55
112.42
6,682.40
6,580.40
-2,151.12
1,636.04
5,967,507.13
551,799.12
18.48
1,636.04
MWD (3)
' 9,705.35
92.95
117.15
6,681.48
6,579.48
-2,163.74
1,663.36
5,967,494.70
551,826.53
17.60
1,663.36
MWD (3)
9,735.22
94.52
120.59
6,679.53
6,577.53
-2,178.12
1,689.46
5,967,480.49
551,852.72
12.64
1,689.46
MWD (3)
9,765.39
94.67
122.68
6,677.12
6,575.12
-2,193.90
1,715.07
5,967,464.89
551,878.42
6.92
1,715.07
MWD (3)
9,795.23
97.73
121.24
6,673.89
6,571.89
-2,209.60
1,740.23
5,967,449.36
551,903.69
11.32
1,740.23
MWD (3)
9,825.31
97.51
117.75
6,669.90
6,567.90
-2,224.27
1,766.18
5,967,434.86
551,929.73
11.52
1,766.18
MWD (3)
9,855.05
94.76
115.01
6,666.72
6,564.73
-2,237.41
1,792.66
5,967,421.90
551,956.30
13.02
1,792.66
MWD (3)
9,885.41
93.16
112.22
6,664.63
6,562.63
-2,249.54
1,820.41
5,967,409.96
551,984.13
10.57
1,820.41
MWD (3)
9,915.10
89.66
110.19
6,663.90
6,561.90
-2,260.27
1,848.08
5,967,399.41
552,011.86
13.63
1,848.08
MWD (3)
9,945.11
85.75
109.17
6,665.10
6,563.10
-2,270.37
1,876.30
5,967,389.50
552,040.15
13.46
1,876.30
MWD (3)
9,975.05
85.88
105.75
6,667.28
6,565.28
-2,279.33
1,904.78
5,967,380.74
552,068.69
11.40
1,904.78
MWD (3)
10,005.26
85.64
102.45
6,669.52
6,567.52
-2,286.66
1,934.00
5,967,373.59
552,097.95
10.92
1,934.00
MWD (3)
10,035.22
88.19
99.71
6,671.13
6,569.13
-2,292.41
1,963.35
5,967,368.04
552,127.34
12.48
1,963.35
MWD (3)
10,065.31
88.74
96.06
6,671.94
6,569.94
-2,296.54
1,993.14
5,967,364.12
552,157.15
12.26
1,993.14
MWD (3)
10,095.63
90.06
92.55
6,672.26
6,570.26
-2,298.81
2,023.37
5,967,362.04
552,187.39
12.37
2,023.37
MWD (3)
10,125.40
89.60
88.85
6,672.34
6,570.34
-2,299.18
2,053.13
5,967,361.88
552,217.15
12.52
2,053.13
MWD (3)
10,155.19
91.14
86.22
6,672.15
6,570.15
-2,297.90
2,082.89
5,967,363.36
552,246.90
10.23
2,082.89
MWD (3)
12120/2016 9:01:25AM Page 4 COMPASS 5000.1 Build 74
- ConocoPhillips FIN ii2
ConocoPhillips Definitive Survey Report BHUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Project:
Kuparuk River Unit
Site:
Kuparuk 1 B Pad
Well:
1B-18
Wellbore:
1 B-18AL3-01
Design:
1 B-18AL3-01
Survey
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 1 B-18
1 B-18 @ 102.00usft
1 B-18 @ 102.O0usft
True
Minimum Curvature
EDM Alaska NSK Sandbox
Annotation
12120/2016 9:01:25AM Page 5 COMPASS 5000.1 Build 74
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
DLS
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
Northing
Easting
(°1100')
Section S
Survey
Y Tool Name
(ft)
(ft)
(ft)
10,185.17
94.92
87.03
6,670.57
6,568.57
-2,296.13
2,112.77
5,967,365.32
552,276.77
12.89
2,112.77 MWD (3)
10,215.17
97.08
86.98
6,667.43
6,565.43
-2,294.57
2,142.57
5,967,367.08
552,306.54
7.20
2,142.57 MWD (3)
10,245.23
95.32
93.78
6,664.18
6,562.18
-2,294.78
2,172.43
5,967,367.08
552,336.41
23.24
2,172.43 MWD (3)
10,276.51
96.77
91.86
6,660.89
6,558.89
-2,296.31
2,203.50
5,967,365.75
552,367.48
7.66
2,203.50 MWD (3)
10,306.34
97.92
91.05
6,657.07
6,555.07
-2,297.06
2,233.07
5,967,365.20
552,397.06
4.70
2,233.07 MWD (3)
10,335.15
98.88
84.67
6,652.86
6,550.86
-2,296.00
2,261.54
5,967,366.45
552,425.51
22.16
2,261.54 MWD (3)
10,365.71
98.56
80.01
6,648.22
6,546.22
-2,291.97
2,291.46
5,967,370.68
552,455.41
15.11
2,291.46 MWD (3)
10,395.40
97.05
76.63
6,644.19
6,542.19
-2,286.02
2,320.26
5,967,376.82
552,484.17
12.37
2,320.26 MWD (3)
10,425.49
94.86
78.53
6,641.07
6,539.07
-2,279.58
2,349.49
5,967,383.45
552,513.34
9.61
2,349.49 MWD (3)
10,455.21
94.36
83.24
6,638.68
6,536.68
-2,274.89
2,378.73
5,967,388.34
552,542.55
15.89
2,378.73 MWD (3)
10,485.40
95.57
87.78
6,636.07
6,534.07
-2,272.53
2,408.71
5,967,390.90
552,572.51
15.51
2,408.71 MWD (3)
10,515.15
94.58
92.43
6,633.43
6,531.43
-2,272.59
2,438.33
5,967,391.04
552,602.13
15.92
2,438.33 MWD (3)
10,545.23
92.98
95.39
6,631.45
6,529.45
-2,274.64
2,468.27
5,967,389.19
552,632.08
11.17
2,468.27 MWD (3)
10,575.11
88.89
96.81
6,630.96
6,528.96
-2,277.81
2,497.97
5,967,386.22
552,661.80
14.49
2,497.97 MWD (3)
10,605.55
89.33
100.52
6,631.43
6,529.43
-2,282.40
2,528.05
5,967,381.83
552,691.91
12.27
2,528.05 MWD (3)
10,635.50
89.85
104.21
6,631.65
6,529.65
-2,288.81
2,557.30
5,967,375.62
552,721.20
12.44
2,557.30 MWD (3)
10,665.23
90.03
108.76
6,631.68
6,529.68
-2,297.24
2,585.80
5,967,367.37
552,749.75
15.32
2,585.80 MWD (3)
10,695.23
89.82
103.27
6,631.72
6,529.72
-2,305.52
2,614.63
5,967,359.29
552,778.63
18.31
2,614.63 MWD (3)
10,725.15
88.19
102.98
6,632.24
6,530.24
-2,312.31
2,643.76
5,967,352.70
552,807.80
5.53
2,643.76 MWD (3)
10,755.43
89.54
101.31
6,632.84
6,530.84
-2,318.68
2,673.36
5,967,346.53
552,837.43
7.09
2,673.36 MWD (3)
10,785.21
91.75
97.42
6,632.50
6,530.50
-2,323.52
2,702.73
5,967,341.88
552,866.84
15.02
2,702.73 MWD (3)
10,815.23
92.73
93.39
6,631.33
6,529.33
-2,326.35
2,732.59
5,967,339.25
552,896.71
13.81
2,732.59 MWD (3)
10,845.09
92.98
89.78
6,629.84
6,527.84
-2,327.17
2,762.39
5,967,338.63
552,926.52
12.10
2,762.39 MWD (3)
10,872.23
92.83
86.84
6,628.47
6,526.47
-2,326.37
2,789.48
5,967,339.61
552,953.60
10.83
2,789.48 MWD (3)
10,900.00
92.83
86.84
6,627.09
6,525.10
-2,324.84
2,817.18
5,967,341.32
552,981.28
0.00
2,817.18 PROJECTED to TO
Annotation
12120/2016 9:01:25AM Page 5 COMPASS 5000.1 Build 74
we as
BAKER Date:
HUGHES
To:
RECEIVE
JAN 0 6 2017
December 22, 2016
Makana Bender
AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska 99501
From:
Letter of Transmittal
DATA LOGGED
\ /?P /201 -C
K. BENDER
Yosha Ragbirsingh / Michael Soper
Baker Hughes INTEQ
795 East 94th Avenue
Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
1B -18A
21 6108
27
86
1B-18AL1
2 1
F 1 09
27
86
1B-18AL2
1B-18AL3PB1
2 1
61 10
27
86
4
1B-18AL3
2 1
6 7 44
27
86
5
1B-18AL3-01
2 1
6 1 4 4
27
86
6
21
61 56
27867
(6) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Michael Soper, Baker Hughes, Project Engineer
Michael. Soper@BakerHughes.com
Yosha Ragbirsingh, Baker Hughes, Survey Manager
Yo sha. Ragbirsingh@B akerHughe s. com
ConocoPh i l l ips
JAN 0 6 2017
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1B Pad
1 B-18AL3-01
50-029-22472-63
Baker Hughes I NTEQ
Definitive Survey Report
20 December, 2016
MEMM
FeA a I
BAKER
HUGHES
�.
ConocoPhillips
Fur kI
ConocoPhillips
Definitive Survey Report
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference: Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference: 1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference: 1 B-18 @ 102.00usft
Well:
1B-18
North Reference: True
Wellbore:
1B-18AL3-01
Survey Calculation Method: Minimum Curvature
Design:
1 B-18AL3-01
Database: EDM Alaska NSK Sandbox
Project
Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum: Mean Sea Level
F
Geo Datum:
NAD 1927 (NADCON CONUS)
Using Well Reference Point
r
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Well
1B-18
Well Position
+N/-S 0.00 usft
Northing: 5,969,647.06 usft
Latitude:
70° 19'40.248 N
+E/-W 0.00 usft
Easting: 550,148.90 usft
Longitude:
149° 35' 35.868 W
Position Uncertainty
0.00 usft
Wellhead Elevation: usft
Ground Level:
61.20 usft
Wellbore
113-18AL3-01
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
(1
(`)
(nT)
BGGM2016 10/1/2016
18.01
80.96
57,551
Design
1 B-18AL3-01
Audit Notes:
Version:
1.0 Phase: ACTUAL
Tie On Depth: 8,350.60
Vertical Section:
Depth From (TVD)
+N/-S +E/-W
Direction
(usft)
(usft) (usft)
(I
40.80
0.00 0.00
90.00
Survey Program
Date 12/16/2016
From
To
Survey
Survey
(usft)
(usft) Survey (Wellbore)
Tool Name Description
Start Date
End Date
469.67
6,897.50 1B-18(1B-18)
MWD MWD- Standard
4/28/1994
4/28/1994
7,392.00
8,350.60 1B-18AL3PB1 (113-18AL3PB1)
MWD MWD- Standard
11/5/2016
11/11/2016
8,387.00
10,872.23 1B-18AL3-01 (1B-18AL3-01)
MWD MWD- Standard
11/21/2016
11/25/2016
12120/2016 9:01:25AM
Page 2
COMPASS 5000.1 Build 74
ConocoPhillips
Company:
Project:
Site:
Well:
Wellbore:
Design:
Survey
ConocoPhillips (Alaska) Inc. -Kupl
Kuparuk River Unit
Kuparuk 1B Pad
113-18
1 B-18AL3-01
1 B-18AL3-01
ConocoPhillips
Definitive Survey Report
Local Co-ordinate Reference:
Well 1 B-18
TVD Reference:
1 B-18 @ 102.00usft
MD Reference:
1 B-18 @ 102.00usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Database:
EDM Alaska NSK Sandbox
Vertical
Section
Survey Tool Name
(ft)
422.76
Map
Map
MWD (3)
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Est ng
DLS
(usft)
(1
(1)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100')
8,350.60
89.39
57.58
6,696.47
6,594.47
-2,412.00
422.76
5,967,238.17
550,587.73
1.42
8,387,0D
86.17
56.06
6,697.88
6,595.88
-2,392.10
453.20
5,967,258.27
550,618.03
9.77
8,415.79
83.97
61.38
6,700.36
6,598.36
-2,377.21
477.70
5,967,273.32
550,642.43
19.93
8,445.81
84.71
66.94
6,703.32
6,601.32
-2,36420
504.57
5,967,286.52
550,669.22
18.59
8,475.55
88.13
71.09
6,705.18
6,603.18
-2,353.57
532.28
5,967,297.32
550,696.84
18.06
8,505.49
88.62
76.20
6,706.03
6,604.03
-2,345.15
560.99
5,967,305.94
550,725.49
17.14
8,535.22
92.06
76.46
6,705.85
6,603.85
-2,338.12
589.87
5,967,313.16
550,754.32
11.60
8,565.47
95.87
73.40
6,703.76
6,601.76
-2,330.28
619.00
5,967,321.19
550,783.40
16.14
8,595.44
94.76
68.59
6,700.98
6,598.98
-2,320.57
647.21
5,967,331.10
550,811.54
16.40
8,625.50
94.37
64.18
6,698.59
6,596.59
-2,308.57
674.65
5,967,343.28
550,838.90
14.68
8.,655.37
94.09
59.81
6,696.38
6,594.38
-2,294.58
700.95
5,967,357.44
550,865.10
14.62
8,685.47
92.40
56.22
6,694.68
6,592.68
-2,278.67
726.43
5,967,373.52
550,890.47
13.16
8,715.22
89.69
53.75
6,694.14
6,592.14
-2,261.60
750.79
5,967,390.75
550,914.71
12.32
8,745.15
86.99
51.70
6,695.00
6,593.00
-2,243.48
774.59
5,967,409.02
550,938.39
11.32
8,775.29
84.06
49.34
6,697.36
6,595.36
-2,224.38
797.78
5,967,428.27
550,961.45
12.47
8,805.40
84.56
53.07
6,700.34
6,598.34
-2,205.62
821.13
5,967,447.19
550,984.67
12.44
8,835.07
84.69
57.56
6,703.12
6,601.12
-2,188.81
845.41
5,967,464.16
551,008.84
15.07
8,865.19
83.82
63.04
6,706.14
6,604.14
-2,173.97
871.43
5,967,479.18
551,034.76
18.33
8,895.15
84.65
67.64
6,709.15
6,607.15
-2,161.53
898.52
5,967,491.79
551,061.76
15.53
8,925.25
84.03
66.55
6,712.12
6,610.12
-2,149.88
926.11
5,967,503.63
551,089.26
4.15
8,955.01
84.16
62.54
6,715.18
6,613.18
-2,137.16
952.83
5,967,516.53
551,115.90
13.41
8,985.36
84.93
57.88
6,718.07
6,616.07
-2,122.15
979.04
5,967,531.71
551,142.01
15.49
9,015.81
86.28
59.49
6,720.40
6,618.40
-2,106.37
1,004.98
5,967,547.66
551,167.84
6.B9
9,045.49
88.00
63.33
6,721.88
6,619.88
-2,092.19
1,031.00
5,967,562.01
551,193.76
14.16
9,075.07
88.10
67.53
6,722.89
6,620.89
-2,079.90
1,057.88
5,967,574.48
551,220.56
14.19
9,105.53
87.76
71.54
6,723.99
6,621.99
-2,069.26
1,086.39
5,967,585.31
551,248.99
13.20
9,137.69
87.23
76.39
6,725.40
6,623.40
-2,060.39
1,117.26
5,967,594.39
551,279.80
15.16
9,165.61
88.03
79.82
6,726.55
6,624.55
-2,054.64
1,144.56
5,967,600.32
551,307.05
12.60
9,195.50
88.62
83.94
6,727.43
6,625.43
-2,050.42
1,174.13
5,967,604.73
551,336.59
13.92
9,228.61
90.15
90.27
6,727.78
6,625.78
-2,048.75
1,207.18
5,967,606.62
551,369.62
19.67
Vertical
Section
Survey Tool Name
(ft)
422.76
MWD (2)
453.20
MWD (3)
477.70
MWD (3)
504.57
MWD (3)
532.28
MWD (3)
560.99
MWD (3)
589.87
MWD (3)
619.00
MWD (3)
647.21
MWD (3)
674.65
MWD (3)
70D.95
MWD (3)
726.43
MWD (3)
750.79
MWD (3)
774.59
MWD (3)
797.78
MWD (3)
821.13
MWD (3)
845.41
MWD (3)
871.43
MWD (3)
898.52
MWD (3)
926.11
MWD (3)
952.83
MWD (3)
979.04
MWD (3)
1,004.98
MWD (3)
1,031.00
MWD (3)
1,D57.88
MWD (3)
1,086.39
MWD (3)
1,117.26
MWD (3)
1,144.56
MWD (3)
1,174.13 MWD (3)
1,207.18 MWD (3)
Annotation
TIP
KOP
rias
BAKER
HUGHES
12/20/2016 9:01:25AM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips //al
ConocoPhillips Definitive Survey Report BHUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Well 1 B-18
Project:
Kuparuk River Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 113 Pad
MD Reference:
1 B-18 @ 102.00usft
Well:
1B-18
North Reference:
True
Wellbore:
1 B-18AL3-01
Survey Calculation Method:
Minimum Curvature
Design:
1 B-18AL3-01
Database:
EDM Alaska NSK Sandbox
Survey
Annotation
COMPASS 5000.1 Build 74
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
(1)
(1)
(usft)
(usft)
(usft)
(usft)
(°/100')
Survey Tool Name
(ft)
(ft)
(ft)
9,255.25
93.93
92.00
6,726.83
6,624.83
-2,049.28
1,233.79
5,967,606.28
551,396.24
15.60
1,233.79
MWD (3)
9,285.30
98.82
93.55
6,723.50
6,621.50
-2,050.72
1,263.61
5,967,605.03
551,426.06
17.06
1,263.61
MWD (3)
9,315.59
99.69
97.27
6,718.63
6,616.63
-2,053.54
1,293.36
5,967,602.41
551,455.83
12.46
1,293.36
MWD (3)
9,345.41
99.47
102.87
6,713.66
6,611.66
-2,058.68
1,322.30
5,967,597.47
551,484.80
18.53
1,322.30
MWD (3)
9,375.52
100.66
108.44
6,708.39
6,606.39
-2,066.67
1,350.84
5,967,589.67
551,513.39
18.64
1,350.84
MWD (3)
9,405.68
100.03
113.24
6,702.97
6,600.97
-2,077.22
1,378.56
5,967,579.30
551,541.18
15.79
1,378.56
MWD (3)
9,435.55
95.69
111.92
6,698.89
6,596.89
-2,088.58
1,405.87
5,967,568.13
551,568.56
15.17
1,405.87
MWD (3)
9,465.58
95.16
108.97
6,696.05
6,594.05
-2,099.02
1,433.88
5,967,557.87
551,596.64
9.94
1,433.88
MWD (3)
9,495.69
95.22
106.22
6,693.33
6,591.33
-2,108.08
1,462.46
5,967,549.00
551,625.28
9.10
1,462.46
MWD (3)
9,525.45
95.63
101.51
6,690.51
6,588.51
-2,115.18
1,491.22
5,967,542.10
551,654.08
15.82
1,491.22
MWD (3)
9,555.61
92.92
100.22
6,688.26
6,586.26
-2,120.85
1,520.75
5,967,536.63
551,683.64
9.95
1,520.75
MWD (3)
9,585.45
93.41
100.18
6,686.62
6,584.62
-2,126.13
1,550.07
5,967,531.55
551,713.00
1.65
1,550.07
MWD (3)
9,615.41
94.39
105.31
6,684.58
6,582.58
-2,132.72
1,579.22
5,967,525.15
551,742.18
17.39
1,579.22
MWD (3)
9,645.47
91.69
107.04
6,682.98
6,580.98
-2,141.08
1,608.04
5,967,516.98
551,771.06
10.66
1,608.04
MWD (3)
9,675.23
90.55
112.42
6,682.40
6,580.40
-2,151.12
1,636.04
5,967,507.13
551,799.12
18.48
1,636.04
MWD (3)
9,705.35
92.95
117.15
6,681.48
6,579.48
-2,163.74
1,663.36
5,967,494.70
551,826.53
17.60
1,663.36
MWD (3)
9,735.22
94.52
120.59
6,679.53
6,577.53
-2,178.12
1,689.46
5,967,480.49
551,852.72
12.64
1,689.46
MWD (3)
9,765.39
94.67
122.68
6,677.12
6,575.12
-2,193.90
1,715.07
5,967,464.89
551,878.42
6.92
1,715.07
MWD (3)
9,795.23
97.73
121.24
6,673.89
6,571.89
-2,209.60
1,740.23
5,967,449.36
551,903.69
11.32
1,740.23
MWD (3)
9,825.31
97.51
117.75
6,669.90
6,567.90
-2,224.27
1,766.18
5,967,434.86
551,929.73
11.52
1,766.16
MWD (3)
9,855.05
94.76
115.01
6,666.72
6,564.73
-2,237.41
1,792.66
5,967,421.90
551,956.30
13.02
1,792.66
MWD (3)
9,885.41
93.16
112.22
6,664.63
6,562.63
-2,249.54
1,820.41
5,967,409.96
551,984.13.
1D.57
1,820.41
MWD (3)
9,915.10
89.66
110.19
6,663.90
6,561.90
-2,260.27
1,848.08
5,967,399:41
552,011.86
13.63
1,848.08
MWD (3)
9,945.11
85.75
109.17
6,665.10
6,563.10
-2,270.37
1,876.30
5,967,389.50
552,040.15
13.46
1,876.30
MWD (3)
9,975.05
85.88
105.75
6,667.28
6,565.28
-2,279.33
1,904.78
5,967,380.74
552,068.69
1.1.40
1,904.78
MWD (3)
10,005.26
85.64
102.45
6,669.52
6,567.52
-2,286.66
1,934.00
5,967,373.59
552,097.95
10.92
1,934.00
MWD (3)
10,035.22
88.19
99.71
6,671.13
6,569.13
-2,292.41
1,963.35
5,967,368.04
552,127.34
12.48
1,963.35
MWD (3)
10,065.31
88.74
96.06
6,671.94
6,569.94
-2,296.54
1,993.14
5,967,364.12
552,157.15
12.26
1,993.14
MWD (3)
10,095.63
90.06
92.55
6,672.26
6,570.26
-2,298.81
2,023.37
5,967,362.04
552,187.39
12.37
2,023.37
MWD (3)
10,125.40
89.60
88.85
6,672.34
6,570.34
-2,299.18
2,053.13
5,967,361.68
552,217.15
12.52
2,053.13
MWD (3)
10,155.19
91.14
86.22
6,672.15
6,570.15
-2,297.90
2,082.89
5,967,363.36
552,246.90
10.23
2,082.89
MWD (3)
12/20/2016 9:01:25AM
Page 4
Annotation
COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Vertical
Easting
Local Co-ordinate Reference:
Project:
Kuparuk River Unit
(ft)
552,276.77
ND Reference:
2,112.77 MWD (3)
Site:
Kuparuk 1 B Pad
2,142.57 MWD (3) 1
552,336.41
23.24
MD Reference:
552,367.48
Well:
1B-18
552,397.06
4.70
2,233.07 MWD (3)
552,425.51
North Reference:
2,261.54 MWD (3)
Wellbore:
1 B-18AL3-01
2,291.46 MWD (3)
552,484.17
12.37
2,320.26 MWD (3)
Survey Calculation
Method:
Design:
1 B-18AL3-01
15.89
2,378.73 MWD (3)
552,572.51
15.51
Database:
552,602.13
Survey
2,438.33 MWD (3)
552,632.08
11.17
2,468.27 MWD (3)
552,661.80
14.49
2,497.97 MWD (3)
552,691.91
12.27
2,528.05 MWD (3)
552,721.20
12.44
2,557.30 MWD (3)
552,749.75
Map
MD
Inc
Azi
TVD
TVDSS
+N1 -S
+E/ -W
552,837.43
7.09
2,673.36 MWD (3)
552,866.84
15.02
2,702.73 MWD (3).
552,896.71
13.81
Northing
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
0.00
2,817.18 PROJECTED to TD
(ft)
10,185.17
94.92
87.03
6,670.57
6,568.57
-2,296.13
2,112.77
5,967,365.32
1D,215.17
97. D8
86.98
6,667.43
6,565.43
-2,294.57
2,142.57
5,967,367.08
1D,245.23
95.32
93.78
6,664.18
6,562.18
-2,294.78
2,172.43
5,967,367.08
1D,276.51
96.77
91.86
6,660.89
6,558.89
-2,296.31
2,203.50
5,967,365.75
10,306.34
97.92
91.05
6,657.07
6,555.07
-2,297.06
2,233.07
5,967,365.20
10,335.15
98.88
84.67
6,652.86
6,550.86
-2,296.00
2,261.54
5,967,366.45
3. 10,365.71
98.56
80.01
6,648.22
6,546.22
-2,291.97
2,291.46
5,967,370.68
10,395.40
97.05
76.63
6,644.19
6,542.19
-2,286.02
2,320.26
5,967,376.82
10,425.49
94.86
78.53
6,641.07
6,539.07
-2,279.58
2,349.49
5,967,383.45
10,455.21
94.36
83.24
6,638.68
6,536.68
-2,274.89
2,378.73
5,967,388.34
10,485.40
95.57
87.78
6,636.07
6,534.07
-2,272.53
2,408.71
5,967,390.90
' 10,515.15
a
94.58
92.43
6,633.43
6,531.43
-2,272.59
2,438.33
5,967,391.04
10,545.23
92.98
95.39
6,631.45
6,529.45
-2,274.64
2,468.27
5,967,389.19
10,575.11
88.89
96.81
6,630.96
6,528.96
-2,277.81
2,497.97
5,967,386.22
10,605.55
89.33
100.52
6,631.43
6,529.43
-2,282.40
2,528.05
5,967,381.83
10,635.50
89.85
104.21
6,631.65
6,529.65
-2,288.81
2,557.30
5,967,375.62
10,665.23
90.03
108.76
6,631.68
6,529.68
-2,297.24
2,585.80
5,967,367.37
10,695.23
89.82
103.27
6,631.72
6,529.72
-2,305.52
2,614.63
5,967,359.29
10,725.15
88.19
102.98
6,632.24
6,530.24
-2,312.31
2,643.76
5,967,352.70
10,755.43
89.54
101.31
6,632.84
6,530.84
-2,318.68
2,673.36
5,967,346.53
10,785.21
91.75
97.42
6,632.50
6,530.50
-2,323.52
2,702.73
5,967,341.88
10,815.23
92.73
93.39
6,631.33
6,529.33
-2,326.35
2,732.59
5,967,339.25
10,845.09
92.98
89.78
6,629.84
6,527.84
-2,327.17
2,762.39
5,967,338.63
1D,872.23
92.83
86.84
6,628.47
6,526.47
-2,326.37
2,789.48
5,967,339.61
10,900.00
92.83
86.84
6,627.09
6,525.10
-2,324.84
2,817.18
5,967,341.32
Fel fig
BAKHUGHES
Well 1 B-18
1 B-18 @ 102.00usft
1 B-18 @ 102.00usft
True
Minimum Curvature
EDM Alaska NSK Sandbox
Map
Vertical
Easting
DLS
(°1100')
Section Survey Tool Name Annotation
(ft)
(ft)
552,276.77
12.89
2,112.77 MWD (3)
552,306.54
7.20
2,142.57 MWD (3) 1
552,336.41
23.24
2,172.43 MWD (3)
552,367.48
7.66
2,203.50 MWD (3)
552,397.06
4.70
2,233.07 MWD (3)
552,425.51
22.16
2,261.54 MWD (3)
552,455.41
15.11
2,291.46 MWD (3)
552,484.17
12.37
2,320.26 MWD (3)
552,513.34
9.61
2,349.49 MWD (3) '
552,542.55
15.89
2,378.73 MWD (3)
552,572.51
15.51
2,408.71 MWD (3)
552,602.13
15.92
2,438.33 MWD (3)
552,632.08
11.17
2,468.27 MWD (3)
552,661.80
14.49
2,497.97 MWD (3)
552,691.91
12.27
2,528.05 MWD (3)
552,721.20
12.44
2,557.30 MWD (3)
552,749.75
15.32
2,585.80 MWD (3)
552,778.63
18.31
2,614.63 MWD (3)
552,807.80
5.53
2,643.76 MWD (3)
552,837.43
7.09
2,673.36 MWD (3)
552,866.84
15.02
2,702.73 MWD (3).
552,896.71
13.81
2,732.59 MWD (3)
552,926.52
12.10
2,762.39 MWD (3)
552,953.60
10.83
2,789.48 MWD (3)
552,981.28
0.00
2,817.18 PROJECTED to TD
12/20/2016 9.01:25AM Page 5 COMPASS 5000.1 Build 74
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION ! F ri, 9
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 a. Well Status: Oil ❑� Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspende(E]
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG[:] WDSPL ❑ No. of Completions:
1 b. Well Class:
Development 0 Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
1 4 Zo►�
Aband.:
14. Permit to Drill Number/ Sundry:
216-156
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded: 0.
114129,12946
15. API Number:
50-029-22472-63-00
4a. Location of Well (Governmental Section):
Surface: 500' FNL, 292' FEL, Sec. 9, T11N, R10E, UM
Top of Productive Interval:
2893' FNL, 5122' FEL, Sec. 10, T11 N, R1 OE, UM
Total Depth:
2826' FNL, 2758' FEL, Sec. 10, T11 N, R1 OE, UM
8. Date TD Reached:
- „�1t1Z5'2otto
16. Well Name and Number:
KRU 1B-18AL3-01
9. Ref Elevations: KB: 10-4
GL 61 BF: 41
17. Field / Pool(s):
Kuparuk River Field/ Oil Pool
10. Plug Back Depth MD/TVD:
NA
18. Property Designation:
ADL 25648
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 550147 y- 5969648 Zone- 4
TPI: x- 550618 y- 5967258 Zone- 4
Total Depth: x- 552981 y- 5967341 Zone- 4
11. Total Depth MD1TVD:
10,900' MD/6,627" TVD
19. Land Use Permit:
ALK 466
12. SSSV Depth MD/TVD:
N/A
20. Thickness of Permafrost MD/TVD:
1602'/1602'
5. Directional or Inclination Survey: Yes ❑✓ (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
8387' MD/ 6698' TVD
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/RES
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MD HOLE SIZE CEMENTING RECORD SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM PULLED
16" 62.5 H-40 43 121 43 121 24" 200 sx ASI
7-5/8" 29.7 L-80 41 4256 41 4148 9.875" 650 ASIII, 300 sx G
5"x5.5" 17/18 L-80 26 7809 26 6930 6.75" 210 sx G
2-3/8" 4.6 L-80 8094 10900 67056627 3 Slotted Liner
I +-
24. Open to production or injection? Yes ❑ No ❑
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number): Perfs cement squeezed prior to CTD operations
Slotted Liner from 8387'-10092' MD /6698'-6654' TVD
COMPLETION
DATE
L I Iq I LU
VERIFIED
LL
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
3-1/2" 7061 6934' MD /6244' TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes ❑ No ❑✓
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
12/22/2016
Method of Operation (Flowing, gas lift, etc.):
Gas Lift
Date of Test:
12/25/2016
Hours Tested:
18
Production for
Test Period
Oil -Bbl:
476
Gas -MCF:
915
Water -Bbl:
55
Choke Size:
176 bean
Gas -Oil Ratio:
2107 scf/stb
Flow Tubing
Press. 140
Casinq Press:
1042
Calculated
24 -Hour Rate
Oil -Bbl:
590
Gas -MCF:
1244
Water -Bbl:
73
Oil Gravity - API (corr):
21
Form 10-407 Revised11/2015 ONTINUED ON PAGE 2 C e? Submit ORIGINIAL on
�T� z/,(5-//,7--CONTINUED
-,/1 s J/?, . RE3Df1nS 1,t- JAN 18 20
28. CORE DATA Conventional Core(s): Yes ❑ No 0 Sidewall Cores: Yes ❑ No E]
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No El
If yes, list intervals and formations tested, briefly summarizing test results.
Base PERMAFROST
1602
1602
KOP (Kuparuk A4)
8387
6698
Attach separate pages to this form, if needed, and submit detailed test
TPI (Kuparuk A Sand)
8387
6698
information, including reports, per 20 AAC 25.071.
TD (Kuparuk A4)
10900
6627
31. List of Attachments:
Summary of daily operations, well schematics and final directional surveys.
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Contact: Jeff ConneV Email: 'eff.s.cOnnell cOnOcO hull s.com
Printed Name: G. Eller Title: Principal CTD Engineer
Signature: Phone: (907)-263-4172 Date: Z
INSTRUCTIONS
General: This form and the requi d attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 11/2015 Submit ORIGINAL Only
1 B-18 CTD Working Schematic
16" 62# H-40
shoe @ 121'
MD
7-5/8" 29.7# L-80
shoe @ 4147' MD
5.5" 17# L-80 shoe
@ 6997' M D
C -sand perfs (sqz'd)
7131'- 7273' MD
KOP @ 7392' MD
31/" x 5" TTWS set at 0° toolface
KOP @ 7502' MD
3'/z" x 5" TTWS set at 330° toolface
A -sand pe rfs (sqz'd)
7256'- 7575' MD C
c
Tapered Prod Csq
5'/2, 17#, L-80, 0'-7044' MD
5", 18#, L-80, 7044'-7809' MD
Cameo BP -6 injection nipple @ 1951' MD
ID = 2.813"
3-1/2" 9.3# L-80 ELIE 8rd Tubing to surface
3-1/2" Cameo gas lift mandrels @ 2629', 4223', 5498', 6335'&
6862'
X -nipple @ 6895' MD
ID = 2.812"ID
Baker GBH -22 Loactor & Seal assembly at 6918
Baker 3-1/2" PBR @ 6920' MD (3" ID)
Baker KBH-22 anchor seal assembly at 6933' MD
Baker FA -1 packer @ 6934' MD
5" casing sealbore extension @ 7044' (4.0" ID)
Liner -top packer set post -rig at
6994' MD & swell packer at 7535'
MD (in A5 sand) to ensure no C -
sand production
1 B-1 8A TD @ 9500' MD
Liner Bottom at 8315' MD
Liner Top at 7412' MD (in 5")
16-18AL2 (West)
KO billet at 7610' MD
TD at 8,568' MD
Liner from 8196'- 6994' MD
1B-18AL3 (Northeast)
KO billet at 8094' MD
TD at 9788' MD
Liner from 9785'- 7609' MD
1B-18AL3PB1 (Northeast)
TD @ 9098' MD
1B-18AL1 (East)
KO billet at 8449' MD
TD at 10,200' MD
Liner from 10,092'- 8387' MD
1B-18AL3-01 (East)
KO billet at 8387MD
TD at 10,900' MD
Liner from 10,900'- 8094' MD
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
10/28/2016
10/28/2016
1.00
MIRU
MOVE
RURD
P
Complete pre move check list.
0.0
0.0
12:00
13:00
10/28/2016
10/28/2016
4.00
MIRU
MOVE
MOB
P
Trucks on location, PJSM, stage pits
0.0
0.0
13:00
17:00
on pad, pull sub off 2B-02, hook up
jeeps, move rig to 2C pad access
road.
10/28/2016
10/28/2016
1.00
MIRU
MOVE
WAIT
T
Wait at 2C pad access for CPF2 crew
0.0
0.0
17:00
18:00
change out.
10/28/2016
10/28/2016
3.00
MIRU
MOVE
MOB
P
Move rig from 2C pad to 1B-pad.
0.0
0.0
18:00
21:00
10/28/2016
10/28/2016
0.50
MIRU
MOVE
MOB
P
Remove jeeps, prep 1B-18, set
0.0
0.0
21:00
21:30
herculite and mat.
10/28/2016
10/28/2016
1.25
MIRU
MOVE
MOB
P
Spot sub over 1B-18, lay mats and set
0.0
0.0
21:30
22:45
down.
10/28/2016
10/29/2016
1.25
MIRU
MOVE
MOB
P
Spot pits, lay mays and set down
0.0
0.0
22:45
00:00
10/29/2016
10/29/2016
1.00
MIRU
MOVE
RURD
P
Release trucks, lower BOPE's, work
0.0
0.0
00:00
01:00
on post rig move check list.
10/29/2016
10/29/2016
3.00
MIRU
MOVE
RURD
P
Start rig up checklist. Hook up steam.
0.0
0.0
01:00
04:00
berm celler. Hook up PUTZ
interconnect. RU flowline.
10/29/2016
10/29/2016
2.00
MIRU
WHDBOP
NUND
P
NU BOPE. Install choke hose and
0.0
0.0
04:00
06:00
annular hydraulics. Check tree bolts,
all tight (40 minutes). Grease choke
valves and BOP valves.
10/29/2016
10/29/2016
3.00
MIRU
WHDBOP
CTOP
P
Perform Slack Management, trim 105
0.0
0.0
06:00
09:00
ft of coil to find wire, install CTC, pull
tested to 52 k, re-headed BHI upper
quick (sim-ops),
10/29/2016
10/29/2016
8.00
MIRU
WHDBOP
BOPE
P
Start BOP testing, test witness waived
0.0
0.0
09:00
17:00
per state tester Jeff Jones, 3,500 psi
high/250 psi low/2,500 annular
preventor. Stab INJH test inner reel
valve, stripper, and tiger tank line.
10/29/2016
10/29/2016
2.50
MIRU
WHDBOP
PRTS
P
Pressure test CTC 4,000 psi, good.
0.0
0.0
17:00
19:30
Post BOPE grease choke and BOPE
valves. RD testing equipment, freeze
protect test pump, store test joint back
onto rack in pipe shed. SimOps-
Calibrate MM with Dave Smith.
10/29/2016
10/29/2016
2.50
MIRU
WHDBOP
MPSP
P
PJSM, Load BPV equipment, MU and
0.0
0.0
19:30
22:00
lubricate out BPV, tubing 230 psi,
bleed tubing to zero, still flowing, RD
BPV equipment, off load same while
performing valve alignment check list,
blow down TT line.
10/29/2016
10/30/2016
2.00
PROD1
WHPST
PULD
P
PJSM- Install checks, MU milling BHA
0.0
74.3
22:00
00:00
#1, 0.6° motor with 2.79" string reamer
and 2.79" no-go window mill, MU to
CoilTrak, surface test
10/30/2016
10/30/2016
1.85
PROD1
WHPST
TRIP
P
RIH with window milling BHA #1
74.3
6,930.0
00:00
01:51
10/30/2016
10/30/2016
0.45
PROD1
W HPST
DLOG
P
Tie in to K1 for minus 4.0 ft correction,
6,930.0
6,995.0
01:51
02:18
continue to log HRZ
10/30/2016
10/30/2016
0.70
PROD1
W HPST
TRIP
P
RIH, dry tag pinch point at 7,506 ft,
6,995.0
7,506.0
02:18
03:00
1
PUW 34k, set milling parameters.
Page 1/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation.
(ftKB)
End Depth (ftKB)
10/30/2016
10/30/2016
1.10
PROD1
WHPST
WPST
P
7505.3 ft. Milling 1.53 bpm at 3,769
7,506.0
7,506.7
03:00
04:06
psi FS per recomended practice, WHP
0, IA 400, OA 3, getting crude
stringers back, take 5 bbls out, adjust
WHP to 200 psi, pumping 7 bph away
10/30/2016
10/30/2016
0.60
PROD1
WHPST
WPST
T
7,506.7 ft. Stall motor, PU, set
7,506.7
7,506.7
04:06
04:42
parameters, free spin higher, attempt
to restart milling and stalled, chunked
motor suspect, unable to pump
through bit, Open EDC.
10/30/2016
10/30/2016
2.00
PROD1
WHPST
TRIP
T
POOH for new motor
7,506.7
74.3
04:42
06:42
10/30/2016
10/30/2016
1.50
PROD1
WHPST
PULD
T
PJSM, undeploy failed milling BHA# 1,
74.3
0.0
06:42
08:12
WHP dropped to zero, check well for
flow (no-flow) LD motor
10/30/2016
10/30/2016
1.25
PROD1
WHPST
PULD
T
PU/MU BHA# 2 with new motor and
0.0
74.3
08:12
09:27
mills.
10/30/2016
10/30/2016
1.75
PROD1
WHPST
TRIP
T
Tag up set counters, RIH
74.3
6,960.0
09:27
11:12
10/30/2016
10/30/2016
0.50
PROD1
WHPST
DLOG
T
Log the K1 correction of minus 4.5',
6,960.0
7,506.0
11:12
11:42
continue RIH to pinch point.
Note: NPT 7.0 hrs Baker Hughes.
10/30/2016
10/30/2016
8.60
PROD1
WHPST
MILL
P
Dry tag pinch point at 7,506', PUW 32
7,506.0
7,527.0
11:42
20:18
k, 1.45 bpm at 3735 psi FS, BHP
3,597, open choke, IA 357, OA 3,
holding 1:1 returns. Once bit outside
casing, slowly bring ECD up to 11.8 at
window, 1.44 bpm at 4,120 psi, BHP
4,025 psi, WHP 433, 1.30 bpm rate
out, -8 bph losses.
10/30/2016
10/30/2016
2.30
PROD1
WHPST
REAM
P
7,527 ft. TD rathole. back ream
7,527.0
7,527.0
20:18
22:36
window area, 330R, 30OR and HS, dry
drift window, clean, open EDC
10/30/2016
10/31/2016
1.40
PROD1
WHPST
TRIP
P
POOH for drilling BHA maintaining
7,527.0
2,000.0
22:36
00:00
11.8 tripping schedule.
10/31/2016
10/31/2016
0.75
PROD1
WHPST
TRIP
P
POOH for drilling BHA maintaining
2,000.0
74.3
00:00
00:45
11.8 tripping schedule.
10/31/2016
10/31/2016
1.35
PROD1
WHPST
PULD
P
PUD / LD BHA #2
74.3
0.0
00:45
02:06
10/31/2016
10/31/2016
1.60
PROD1
DRILL
PULD
P
PJSM- MU/PD drilling BHA #3, MU to
0.0
72.2
02:06
03:42
CoilTrak, surface test.
10/31/2016
10/31/2016
1.65
PROD1
DRILL
TRIP
P
RIH with BHA #3, 2.3-° AKO motor
72.2
6,950.0
03:42
05:21
and HCC RR 1-1 Bi-center bit, sat
down at 4,239 ft (GLM #2 at 4,223 ft)
PUW 24k, orientate TF 180°, RIH
clean past suspect GLM.
10/31/2016
10/31/2016
0.30
PROD1
DRILL
DLOG
P
Tie in at K1 for minus 4.5 ft correction
6,950.0
6,976.0
05:21
05:39
10/31/2016
10/31/2016
1.00
PROD1
DRILL
TRIP
P
RIH, displacing well to new mud, close
6,976.0
7,527.0
05:39
06:39
EDC, PUW 29 k, continue RIHTB
10/31/2016
10/31/2016
0.85
PROD1
DRILL
DRLG
P
OBD 1.43 bpm at 4,200 psi, BHP
7,527.0
7,533.0
06:39
07:30
4,344, WHP 530, IA 0, OA 6
10/31/2016
10/31/2016
1.75
PROD1
DRILL
TRIP
T
PUH, BHI tools lost power,
7,533.0
74.3
07:30
09:15
troubleshoot from surface, (issue
pointing down hole via troubleshooting
flowchart.
Page 2/37 Report Printed: 12/27/2016
,.
Operations Summary (with Timelog Depths)
1B-18
f
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/31/2016
10/31/2016
2.00
PROM
DRILL
PULD
T
PJSM, PUD build section BHA with a
74.3
0.0
09:15
11:15
2.3° bend motor successfully, inspect
upper quick and flowsub,
10/31/2016
10/31/2016
1.75
PROD1
DRILL
PULD
T
PD, build section BHA# 4 (pre -loaded)
0.0
72.2
11:15
13:00
Stab INJH, surface test tools (good
test)
10/31/2016
10/31/2016
1.55
PROD1
DRILL
TRIP
T
RIH with build section BHA# 4
72.2
6,950.0
13:00
14:33
10/31/2016
10/31/2016
0.25
PROM
DRILL
DLOG
T
Log the K1 correction of minus 3.0'
6,950.0
6,972.0
14:33
14:48
*** Note: NPT for failed drilling tools
7.0 hrs.
10/31/2016
10/31/2016
0.50
PROM
DRILL
TRIP
T
RIH, PUW above window 29k, Close
6,972.0
7,533.0
14:48
15:18
EDC
10/31/2016
10/31/2016
6.65
PROM
DRILL
DRLG
P
OBD 1.45 bpm at 4093 psi, BHP
7,533.0
7,664.0
15:18
21:57
4101, WHP 594, IA 353, OA 7, slow
drilling thru Anchorite, getting dirty
surveys, not solar or environmental
disruption, troubleshoot, suspect DGS.
10/31/2016
11/1/2016
2.05
PROD1
DRILL
TRIP
T
POOH for new BHA
7,664.0
72.2
21:57
00:00
***Note: NPT for failed drilling tools
2.0 hrs.
11/1/2016
11/1/2016
1.35
PROD1
DRILL
PULD
T
PJSM- PUD BHA #4, bit condition 2-2-
72.2
0.0
00:00
01:21
BT-A-X-I-NO-DTF
11/1/2016
11/1/2016
1.55
PROD1
DRILL
PULD
T
PJSM- MU/PD 3rd build BHA #5, 2.3-°
0.0
72.2
01:21
02:54
AKO motor and RR HCC bit, MU to
Coil Trak, surface test. (Sim -Ops)
11/1/2016
11/1/2016
1.55
PROD1
DRILL
TRIP
T
RIH with 3rd build BHA #5
72.2
6,950.0
02:54
04:27
11/1/2016
11/1/2016
0.25
PROM
DRILL
DLOG
T
Tie in to K1 for a minus 3.5 ft
6,950.0
6,973.0
04:27
04:42
correction
11/1/2016
11/1/2016
0.30
PROD1
DRILL
TRIP
T
RIH, PUW above window 29k, close
6,973.0
7,520.0
04:42
05:00
EDC, clean thru window.
11/1/2016
11/1/2016
0.25
PROD1
DRILL
DLOG
T
Log RA at 7,509.5 ft, TOWS at 7,502
7,520.0
7,657.0
05:00
05:15
ft. Continue RIH.
***Note: NPT for failed drilling tools 5
h rs.
11/1/2016
11/1/2016
1.50
PROM
DRILL
DRLG
P
Stack weight, PUH, dragging minus
7,657.0
7,664.0
05:15
06:45
3.0 k to minus 5.0 k DHWOB, lower
pump rate work pipe to bottom, back
reaming area from 7,657' up to 7,520'
11/1/2016
11/1/2016
8.25
PROM
DRILL
DRLG
P
7,664 ft. OBD 1.40 bpm at 4,100 psi,
7,664.0
7,855.0
06:45
15:00
BHP 4,138, WHP 539, IA 533, OA 11
11/1/2016
11/1/2016
0.50
PROD1
DRILL
TRIP
P
TD build section (EOB), wiper up hole,
7,855.0
7,816.0
15:00
15:30
seems to be dragging 7,816'
11/1/2016
11/1/2016
2.00
PROD1
DRILL
TRIP
P
Continue wiper up hole, cleaning open
7,816.0
7,060.0
15:30
17:30
hole.
Jog tubing tail area. Significant
cuttings observed over the shaker at
bottoms up.
11/1/2016
11/1/2016
2.50
PROD1
DRILL
TRIP
P
Open EDC, continue POOH. Tag up
7,060.0
66.0
17:30
20:00
1
and space out at surface.
Page 3/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/1/2016
11/1/2016
1.00
PROD1
DRILL
PULD
P
PJSM. PUD build BHA #5. Bit graded
66.0
0.0
20:00
21:00
1-1.
11/1/2016
11/1/2016
1.25
PROD1
DRILL
PULD
P
PJSM, PD lateral BHA #6 with 0.5°
0.0
74.0
21:00
22:15
Weatherford motor and RB HYC bit.
11/1/2016
11/2/2016
1.75
PROD1
DRILL
TRIP
P
RIH with BHA #6. Tie in to K1 for a -
74.0
6,984.0
22:15
00:00
3.5 ft correction.
11/2/2016
11/2/2016
0.75
PROD1
DRILL
TRIP
P
Continue running in the hole. Tie in to
6,984.0
7,855.0
00:00
00:45
the K1 for a -3.5 ft correction. Close
EDC at the window. PUW = 29KIbs.
Continue in the hole to bottom. No
issues.
11/2/2016
11/2/2016
3.00
PROD1
DRILL
DRLG
P
BOBD. 1.40 bpm at 4,500 psi, BHP
7,855.0
8,104.0
00:45
03:45
4,145 psi, ROP 20-120 fph.
11/2/2016
11/2/2016
1.75
PROD1
DRILL
DRLG
P
Motor stall at 8104 ft. PU and restart.
8,104.0
8,255.0
03:45
05:30
Stall a second time. PU and restart,
continue drilling ahead.
PUW 31 Klbs.
11/2/2016
11/2/2016
1.00
PROD1
DRILL
WPRT
P
PUH for wiper trip. PUW = 32, pulled
8,255.0
7,080.0
05:30
06:30
heavy negaitive DHWOB, CTSW = 35
k, work area (clean), continue wiper
up hole.
11/2/2016
11/2/2016
0.75
PROD1
DRILL
WPRT
P
Jog/clean the 5"
7,080.0
7,500.0
06:30
07:15
11/2/2016
11/2/2016
0.85
PROD1
DRILL
WPRT
P
Wiper back in hole RIW 10 k
7,500.0
8,255.0
07:15
08:06
11/2/2016
11/2/2016
3.50
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4,397 psi, BHP
8,255.0
8,543.0
08:06
11:36
4125, WHP 352, IA 238, OA 6
11/2/2016
11/2/2016
2.25
PROD1
DRILL
WPRT
T
Unable to retrieve clean survey,
8,543.0
8,543.0
11:36
13:51
Perform DD wiper up hole to 7,997',
perform 6 check shots up hole, PUW
32 k, RBIH to bottom, approved to drill
another 30' per TE
11/2/2016
11/2/2016
1.00
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4,130 psi, BHP
8,543.0
8,655.0
13:51
14:51
4,142, WHP 352, IA 279, OA 6
11/2/2016
11/2/2016
0.75
PROD1
DRILL
WPRT
P
Wiper up hole 7,550' for a tie in. PUW
8,655.0
7,550.0
14:51
15:36
32 k
11/2/2016
11/2/2016
0.25
PROD1
DRILL
DLOG
P
Log the RA marker correction of plus
7,550.0
7,615.0
15:36
15:51
3.0'
11/2/2016
11/2/2016
0.50
PROD1
DRILL
WPRT
P
Wiper back in hole
7,615.0
8,655.0
15:51
16:21
11/2/2016
11/2/2016
1.00
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4330 psi, BHP
8,655.0
8,667.0
16:21
17:21
4125, WHP 217, IA 219, OA 7
11/2/2016
11/2/2016
1.40
PROD1
DRILL
WPRT
T
DD wiper up hole, PUW 29 k unable to
8,667.0
8,667.0
17:21
18:45
get a clean survey, discuss with town
team, approved to drill to 8725 ft (95 ft
past last clean survey at 8630 ft.)
11/2/2016
11/2/2016
0.50
PROD1
DRILL
DRLG
P
BOBD 1.5 bpm at 4530 psi, BHP
8,667.0
8,725.0
18:45
19:15
4125, WOB 1.7 Klbs, ROP 90-120 fph.
Unable to obtain clean survey.
Discuss with town. POOH to
reconfigure BHA.
11/2/2016
11/2/2016
1.25
PROD1
DRILL
TRIP
T
POOH with BHA #6. PUW = 30 Klbs.
8,725.0
7,500.0
19:15
20:30
Pulled heavy at 7672 ft, 7665 ft, 7660
ft, 7643 ft and 7611 ft. (-)7KIbs WOB.
Worked BHA up into 5" casing.
11/2/2016
11/2/2016
0.75
PROD1
DRILL
CIRC
P
Jog 5" casing.
7,500.0
7,060.0
20:30
21:15
Page 4/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/2/2016
11/3/2016
2.75
PROD1
DRILL
TRIP
P
Continue POOH with BHA#6. Bump
7,060.0
74.0
21:15
00:00
up at surface and space out. Begin
PUD BHA #6.
11/3/2016
11/3/2016
0.75
PROD1
DRILL
PULD
T
Finish PUD BHA #6. Bit grade 3-3
74.0
0.0
00:00
00:45
11/3/2016
11/3/2016
0.75
PROD1
DRILL
PULD
T
PD BHA#7 with a 0.5-° AKO motor
0.0
72.0
00:45
01:30
and RR BCC bit.
11/3/2016
11/3/2016
2.00
PROD1
DRILL
TRIP
T
RBIH with BHA #7. Tie in to the K1 for
72.0
7,554.0
01:30
03:30
a -2.5 ft correction.
11/3/2016
11/3/2016
0.50
PROD1
DRILL
TRIP
T
Stacked out at 7554 ft while RIH.
7,554.0
7,554.0
03:30
04:00
PUH. PUW=30 Klbs. Attempt to RBIH.
Stack out at 7562 ft. Vary parameters
to try and work through build section.
11/3/2016
11/3/2016
1.75
PROD1
DRILL
TRIP
T
Continue RIH, obtaining check shot
7,554.0
8,725.0
04:00
05:45
surveys and resurvey
11/3/2016
11/3/2016
7.75
PROD1
DRILL
DRLG
T
OBD 1.5 bpm at 4,080 psi, BHP 4276,
8,725.0
9,125.0
05:45
13:30
IA 155, OA 7
Mud swap, with new 8.6 ppg flopro
mud at the bit at 9067 ft.
11/3/2016
11/3/2016
0.50
PROD1
DRILL
WPRT
T
Wiper up hole PUW 27 k
9,125.0
8,125.0
13:30
14:00
11/3/2016
11/3/2016
0.50
PROD1
DRILL
WPRT
T
Wiper back in hole. RN 8 k
8,125.0
9,125.0
14:00
14:30
11/3/2016
11/3/2016
5.25
PROD1
DRILL
DRLG
T
BOBD 1.5 bpm at 3,913 psi, BHP
9,125.0
9,254.0
14:30
19:45
4,233, WHIP 623, IA 7, OA 10
11/3/2016
11/3/2016
0.25
PROD1
DRILL
WPRT
T
BHA wiper. PUW = 28 Klbs, SOW =
9,254.0
9,254.0
19:45
20:00
11.8 Klbs.
11/3/2016
11/4/2016
4.00
PROD1
DRILL
DRLG
T
BOBD 1.5 bpm at 4100 psi, BHP
9,254.0
9,453.0
20:00
00:00
4,250, W H P 615, IA 7, OA 10
11/4/2016
11/4/2016
2.50
PROD1
DRILL
DRLG
T
Continue crosscutting down through
9,453.0
9,500.0
00:00
02:30
section.
1.5 bpm at 4200 psi, BHP 4,200
Geologist called TD at 9500 feet.
Pump TD sweeps.
11/4/2016
11/4/2016
2.75
PROD1
DRILL
TRIP
T
POOH with BHA #7. PUW 29KIbs.
9,500.0
7,070.0
02:30
05:15
11/4/2016
11/4/2016
0.25
PROD1
DRILL
WPRT
T
Jog the 5", pull tight at the tubing tail,
7,070.0
7,215.0
05:15
05:30
RBIH stacked out and stalled motor,
jog again
11/4/2016
11/4/2016
2.25
PROD1
DRILL
WPRT
T
Continue wiper to the swab valves.
7,215.0
72.0
05:30
07:45
11/4/2016
11/4/2016
1.75
PROD1
DRILL
TRIP
T
Tag up at surface, reset counters, RIH
72.0
6,950.0
07:45
09:30
11/4/2016
11/4/2016
0.25
PROD1
DRILL
DLOG
T
Log the K1 correction of minus 2.5'
6,950.0
6,975.0
09:30
09:45
11/4/2016
11/4/2016
1.00
PROD1
DRILL
WPRT
T
Continue RIH to the EOB, POOH
6,975.0
7,855.0
09:45
10:45
11/4/2016
11/4/2016
1.25
PROD1
DRILL
WPRT
T
PUH, cleaning build section, perform
7,855.0
7,070.0
10:45
12:00
jog above window, open EDC, jetting
the 5"
11/4/2016
11/4/2016
0.25
PROD1
DRILL
TRIP
T
Close EDC, wiper back in hole RIW 15
7,070.0
7,655.0
12:00
12:15
k, pull back up hole log RA.
11/4/2016
11/4/2016
0.25
PROD1
DRILL
DLOG
T
Log the RA for no correction.
7,655.0
7,679.0
12:15
12:30
11/4/2016
11/4/2016
4.00
PROD1
DRILL
TRIP
T
RBIH. Tag up at 9210 ft. Multiple
7,679.0
9,252.0
12:30
16:30
stalls. Work BHA down. Could not get
deeper than 9252 ft.
Page 5/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKS)
11/4/2016
11/4/2016
1.50
PROM
DRILL
TRIP
T
PUH to the window. Pulling heavy in
9,252.0
7,515.0
16:30
18:00
the build section. Work BHA up
towards window.
Tie in to the RA for a +5 ft correction.
11/4/2016
11/4/2016
0.75
FROM
DRILL
TRIP
T
RBIH. Could not work past 9269 ft.
7,515.0
9,269.0
18:00
18:45
11/4/2016
11/4/2016
3.75
PROM
DRILL
DISP
T
POOH pumping liner running pill.
9,269.0
72.0
18:45
22:30
Clean trip through build section.
Paint window flag at 6472 ft.
11/4/2016
11/4/2016
0.50
PROM
DRILL
OWFF
T
Flow check at surface. Static.
72.0
72.0
22:30
23:00
11/4/2016
11/5/2016
1.00
PROM
DRILL
PULD
T
PJSM. LD BHA #7.
72.0
0.0
23:00
00:00
11/5/2016
11/5/2016
0.25
PROD1
DRILL
DRLG
T
Finish LD BHA #7. Bit grade 1-2.
0.0
0.0
00:00
00:15
11/5/2016
11/5/2016
0.75
PROD1
DRILL
BOPE
T
Function test BOPE.
0.0
0.0
00:15
01:00
11/5/2016
11/5/2016
4.50
COMPZ1
CASING
PUTB
T
Prep floor to run liner. PU 29 joints 2-
0.0
0.0
01:00
05:30
3/8" slotted liner. PU/MU anchored
billet assembly. MU CoilTrak tools.
Stab injector.
11/5/2016
11/5/2016
1.50
COMPZI
CASING
RUNL
T
Bump up and reset counters. RIH with
0.0
7,369.0
05:30
07:00
liner on CT.
11/5/2016
11/5/2016
0.25
COMPZ1
CASING
RUNL
T
Correct to the EOP flag at 6,400',
7,369.0
7,369.0
07:00
07:15
minus 5.2'
11/5/2016
11/5/2016
1.00
COMPZ1
CASING
RUNL
T
Close EDC, PUW 29 k, continue RIH
7,369.0
8,315.0
07:15
08:15
to bottom
11/5/2016
11/5/2016
1.50
COMPZ1
CASING
RUNL
T
Set down plus 7 k, DHWOB, PUH
8,315.0
8,315.0
08:15
09:45
minus 8 k, discuss with town, pull up
to max with out initiating further
setting, or damage to tools string.
CTSW-45 k, DHWOB-minus 18 k,
RBIH to neutral wieght
11/5/2016
11/5/2016
1.00
COMPZ1
CASING
RUNL
T
WOO
8,315.0
8,315.0
09:45
10:45
11/5/2016
11/5/2016
2.00
COMPZ1
CASING
TRIP
T
Bring pump up to shear 3,600 psi,
8,315.0
72.5
10:45
12:45
PUW 28 k, TOB at 7,412'. POOH
11/5/2016
11/5/2016
0.50
COMPZ1
CASING
SFTY
T
Check well for flow, PJSM
72.5
0.0
12:45
13:15
11/5/2016
11/5/2016
0.75
COMPZ1
CASING
PULD
T
LD, liner setting tools,
0.0
0.0
13:15
14:00
11/5/2016
11/5/2016
1.00
PROD1
RPEQPT
PULD
T
Load WS into pipe shed, MU and
0.0
0.0
14:00
15:00
scibe tools, inspect Top Drive
11/5/2016
11/5/2016
1.00
PROD1
RPEQPT
PULD
T
PU/MU/WS BHA# 9
0.0
75.3
15:00
16:00
11/5/2016
11/5/2016
1.50
PROM
RPEQPT
TRIP
T
RIH, with WS, pumping min rate 0.3
75.3
6,950.0
16:00
17:30
bpm
11/5/2016
11/5/2016
0.25
FROM
RPEQPT
DLOG
T
log the K1 correction of -2.5 ft.
6,950.0
6,983.0
17:30
17:45
11/5/2016
11/5/2016
0.25
PROD1
RPEQPT
TRIP
T
Position WS on depth. PUW = 28
6,983.0
9,405.0
17:45
18:00
Klbs.
11/5/2016
11/5/2016
0.25
FROM
RPEQPT
WPST
T
Close EDC. Bring up pumps and set
9,405.0
9,405.0
18:00
18:15
anchors. Set down 5KIbs WOB to
confirm set. Top of WS set at 7392 ft,
oriented HS.
11/5/2016
11/5/2016
1.25
PROD1
RPEQPT
TRIP
T
POOH with WS running tools.
9,405.0
73.0
18:15
19:30
11/5/2016
11/5/2016
0.50
FROM
RPEQPT
OWFF
T
Flow check at surface. Static.
73.0
73.0
19:30
20:00
Page 6137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/5/2016
11/5/2016
0.75
PROD1
RPEQPT
PULD
T
PJSM, LD BHA#9.
73.0
0.0
20:00
20:45
11/5/2016
11/5/2016
1.25
PROD1
WHPST
PULD
T
PJSM. PU BHA #10 with 0.6° AKO
0.0
75.0
20:45
22:00
motor and HCC DSM.
11/5/2016
11/5/2016
1.50
PROD1
WHPST
TRIP
T
RIH with BHA#10.
75.0
6,950.0
22:00
23:30
11/5/2016
11/5/2016
0.25
PROD1
WHPST
DLOG
T
Tie in to the K1 for a -4 correction
6,950.0
7,000.0
23:30
23:45
11/5/2016
11/6/2016
0.25
PROD1
WHPST
TRIP
T
Continue to RIH with BHA #10. Begin
7,000.0
7,371.0
23:45
00:00
displacing well to drilling fluid.
11/6/2016
11/6/2016
1.25
PROD1
WHPST
CIRC
T
Displace well from completion fluid to
7,371.0
7,371.0
00:00
01:15
FloPro drilling fluid.
**Adjust for daylight savings time***
11/6/2016
11/6/2016
0.25
PROD1
WHPST
WPST
T
RIH and dry tag WS at 7395 ft (TOWS
7,371.0
7,392.0
01:15
01:30
7392 ft). Begin milling window per
procedure.
11/6/2016
11/6/2016
7.00
PROD1
WHPST
WPST
T
Begin milling window per procedure.
7,392.0
7,401.0
01:30
08:30
11/6/2016
11/6/2016
1.50
PROD1
WHPST
WPST
T
Continue milling with string reamer @
7,401.0
7,403.0
08:30
10:00
1.4 fph,
11/6/2016
11/6/2016
4.00
PROD1
WHPST
WPST
T
Drill rathole towards TD 7417', 1.45
7,403.0
7,417.0
10:00
14:00
bpm at 3840 psi, BHP 4023, WHP
403, IA 61, OA 9
11/6/2016
11/6/2016
1.50
PROD1
WHPST
WPST
T
Back Ream window 0°, 30° ROHS,
7,417.0
7,292.0
14:00
15:30
30° LOHS, and 0°
11/6/2016
11/6/2016
0.25
PROD1
WHPST
WPST
T
PUH, and dry drift window area.
7,292.0
7,417.0
15:30
15:45
11/6/2016
11/6/2016
2.00
PROD1
WHPST
WPST
T
POOH, pumping 1.45 bpm at 3,900
7,417.0
70.0
15:45
17:45
psi, BHP 4,029, WHP 417, IA 97, OA
0
11/6/2016
11/6/2016
1.50
PROD1
WHPST
PULD
T
PJSM. PUD BHA #10. Crew change.
70.0
0.0
17:45
19:15
Finish PUD.
Mill gauge 2.79" no-go.
11/6/2016
11/6/2016
2.00
PROD1
DRILL
PULD
T
PJSM, PD Build BHA #11 with 1.7°
0.0
74.0
19:15
21:15
AKO motor and HCC bit.
11/6/2016
11/7/2016
2.75
PROD1
DRILL
TRIP
T
Bump up and reset counters. RIH with
74.0
7,437.0
21:15
00:00
BHA #11. Log the K1 for a -3 ft
correction. Close EDC. PUW at the
window = 37 Klbs.
11/7/2016
11/7/2016
6.75
PROW
DRILL
DRLG
T
BOBD. Pumping 1.45 bpm at 4200
7,437.0
7,562.0
00:00
06:45
psi. WOB = 2-3 Klbs. CTW = 12.5
Klbs, BHP = 4140 psi. ROP = 5-80
fph.
Some stalls observed while drilling this
interval.
11/7/2016
11/7/2016
2.75
PROD1
DRILL
TRIP
T
POOH, perform jog in the 5" with open
7,562.0
72.2
06:45
09:30
EDC
11/7/2016
11/7/2016
1.25
PROD1
DRILL
PULD
T
OOH, PJSM, PUD and LD build
72.2
0.0
09:30
10:45
section BHA# 11
11/7/2016
11/7/2016
1.00
PROD1
DRILL
SVRG
T
Service INJH, change oil in TOP
0.0
0.0
10:45
11:45
Drive.
11/7/2016
11/7/2016
1.25
PROD1
DRILL
PULD
T
PJSM, PD second build section BHA#
0.0
72.2
11:45
13:00
12 with 2.3° motor and RR HCC bi-
center bit.
11/7/201611/7/2016
2.00
PROD1
DRILL
TRIP
T
RIH, slowing down 20 fpm pass
72.2
6,950.0
13:00
15:00
1
jewlery.
Page 7/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftK6)
11/7/2016
11/7/2016
0.45
PROM
DRILL
DLOG
T
Log the K1 marker correction of minus
6,950.0
6,977.0
15:00
15:27
3.0', continue RIH to log RA marker.
11/7/2016
11/7/2016
0.30
PROD1
DRILL
DLOG
T
Log the RA no correction
6,977.0
7,432.0
15:27
15:45
TO W S=7,392.15'
BOW= 7,401'
RA= 7399.5'
11/7/2016
11/7/2016
0.30
PROM
DRILL
TRIP
T
Continue RIH to bottom
7,432.0
7,562.0
15:45
16:03
11/7/2016
11/7/2016
5.25
PROM
DRILL
DRLG
T
OBD 1.45 bpm at 4035 psi FS, BHP
7,562.0
7,599.0
16:03
21:18
4108, WHP 380, IA 0, OA 7
11/7/2016
11/7/2016
0.25
PROD1
DRILL
WPRT
T
Wiper up hole PUW 29 k
7,599.0
7,476.0
21:18
21:33
11/7/2016
11/7/2016
0.25
PROD1
DRILL
WPRT
T
Wiper back in hole, RM 15 k
7,476.0
7,599.0
21:33
21:48
11/7/2016
11/8/2016
2.20
PROM
DRILL
DRLG
T
BOBD 1.45 bpm at 3950 psi, BHP
7,599.0
7,693.0
21:48
00:00
4141, WHP 437, IA 220, OA 10
11/8/2016
11/8/2016
2.00
PROD1
DRILL
DRLG
T
BOBD 1.45 bpm at 3950 psi, BHP
7,693.0
7,800.0
00:00
02:00
4150, WHP 437, IA 220, OA 10
End of build at 7800 ft.
11/8/2016
11/8/2016
2.00
PROD1
DRILL
TRIP
T
POOH with BHA #12. PUW = 30KIbs.
7,800.0
70.0
02:00
04:00
11/8/2016
11/8/2016
1.50
PROM
DRILL
PULD
T
PUD and LD BHA #12.
70.0
0.0
04:00
05:30
11/8/2016
11/8/2016
1.50
PROD1
DRILL
PULD
T
PD BHA#13 with 0.46° AKO motor
0.0
72.0
05:30
07:00
and new HYC bit.
11/8/2016
11/8/2016
2.75
PROM
DRILL
TRIP
T
RIH with BHA #13.
72.0
6,950.0
07:00
09:45
11/8/2016
11/8/2016
0.25
PROD1
DRILL
DLOG
T
Log K1 for a -2.5 ft correction.
6,950.0
7,000.0
09:45
10:00
11/8/2016
11/8/2016
0.75
PROD1
DRILL
TRIP
T
Continue running in the hole to
7,000.0
7,800.0
10:00
10:45
bottom. PUW at the window = 27KIbs,
Close EDC. Clean trip through window
and open hole.
11/8/2016
11/8/2016
10.14
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.4 bpm at 4230 psi.
7,800.0
8,210.0
10:45
20:53
WOB = 1.5KIbs. CTW = 13.5KIbs.
BHP = 4190 psi.
11/8/2016
11/8/2016
0.55
PROM
DRILL
WPRT
T
Wiper Trip Uphole. PUW = 25k
8,210.0
7,000.0
20:53
21:26
Pumped a 5/5 pill sweep before
PUH.. i .............. made several jogs in
5" casing..........
11/8/2016
11/8/2016
0.27
PROD1
DRILL
TRIP
T
Trip back in hole
7,000.0
7,385.0
21:26
21:42
11/8/2016
11/8/2016
0.30
PROM
DRILL
DLOG
T
Log the RA Tag at 7,400' and make a
7,420.0
7,420.0
21:42
22:00
correction of +2'
11/8/2016
11/8/2016
0.45
PROD1
DRILL
TRIP
T
Trip back in hole
7,420.0
8,210.0
22:00
22:27
11/8/2016
11/9/2016
1.54
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.4 bpm at 4251 psi.
8,210.0
8,218.0
22:27
00:00
WOB = 2.25KIbs. CTW = 10.5KIbs.
BHP = 4210 psi. ROP = 4.7 to 6.5 fph
11/9/2016
11/9/2016
2.00
PROM
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4321 psi.
8,218.0
8,236.0
00:00
02:00
WOB = 2.32KIbs. CTW = 11.4KIbs.
BHP = 4220 psi. ROP = 4.0 FPH
11/9/2016
11/9/2016
6.50
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4379 psi.
8,236.0
8,323.0
02:00
08:30
WOB = 1.32KIbs. CTW = 10.8 Klbs.
BHP = 4230 psi. ROP = 7.5 to 30
FPH
Page 8137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/9/2016
11/9/2016
0.25
PROD1
DRILL
WPRT
T
Short wiper. PUW = 28k
8,323.0
8,200.0
08:30
08:45
11/9/2016
11/9/2016
0.25
PROD1
DRILL
WPRT
T
RBIH. SOW = 12k
8,200.0
8,323.0
08:45
09:00
Clean trip in and out.
11/9/2016
11/9/2016
9.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4379 psi.
8,323.0
8,426.0
09:00
18:00
WOB = 1.32KIbs. CTW = 10.8 Klbs.
BHP = 4230 psi. ROP = 7.5 to 30
FPH
11/9/2016
11/9/2016
3.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4364 psi.
8,426.0
8,503.0
18:00
21:00
WOB = 1.39KIbs. CTW = 13.5 Klbs.
BHP = 4254 psi. ROP = 20 to 30 FPH
11/9/2016
11/10/2016
3.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4457 psi.
8,503.0
8,574.0
21:00
00:00
WOB = 2.10KIbs. CTW = 10.5 Klbs.
BHP = 4260 psi. ROP = 20 to 44 FPH
11/10/2016
11/10/2016
1.19
PROD1
DRILL
DRLG
T
OBD. Pumping 1.4 bpm at 4257 psi.
8,574.0
8,590.0
00:00
01:11
WOB = 1.63KIbs. CTW = 8.8 Klbs.
BHP = 4320 psi. ROP = 07 to 18 FPH
Pump a 5 x 5 Hi/Lo Vis Pill prior to
beginning wiper trip.......
11/10/2016
11/10/2016
0.38
PROD1
DRILL
DRLG
T
Wiper trip up hole. Initiate a 1,000 ft
8,590.0
7,598.0
01:11
01:34
wiper trip 20 ft earlier than planned
due to verylow ROP (<10 fph) PUW
= 25K
11/10/2016
11/10/2016
0.48
PROD1
DRILL
DRLG
T
Trip back in hole. RIW = 9.3K
7,598.0
8,590.0
01:34
02:03
11/10/2016
11/10/2016
4.45
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.4 bpm at 4209 psi.
8,590.0
8,630.0
02:03
06:30
WOB = 2.03KIbs. CTW = 9.3 Klbs.
BHP = 4282 psi. ROP = 6 to 16 FPH
Initiate swapping to a new mud
system.... switching from FlowVis to
8.7 ppbPowerPro w/3% KlaStop and
6% KCL
New mud at the bit at 8,596' @ 0242
hrs
11/10/2016
11/10/2016
0.25
PROD1
DRILL
WPRT
T
BHA Wiper. PUW = 27 Klbs
8,630.0
8,467.0
06:30
06:45
11/10/2016
11/10/2016
0.25
PROD1
DRILL
WPRT
T
RBIH. SOW 13 Klbs.
8,467.0
8,630.0
06:45
07:00
11/10/2016
11/10/2016
2.25
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.67 bpm at 4300
8,630.0
8,685.0
07:00
09:15
psi. WOB = 1.7KIbs. CTW = 13 Klbs.
BHP = 4280 psi. ROP = 10 to 25 FPH
11/10/2016
11/10/2016
2.75
PROD1
DRILL
TRIP
T
Discuss with town. Made decision to
8,685.0
72.0
09:15
12:00
POOH and c/o bit and BHA.
POOH. PUW = 26 Klbs.
Clean trip out of the hole.
11/10/2016
11/10/2016
1.75
PROD1
DRILL
PULD
T
PJSM. PUD BHA #13. Bit grade 2-2.
72.0
0.0
12:00
13:45
11/10/2016
11/10/2016
1.50
PROD1
DRILL
CTOP
T
Change out UQC. Test e-line.
0.0
0.0
13:45
15:15
11/10/2016
11/10/2016
0.25
PROD1
DRILL
CTOP
T
Change out stripper pack off.
0.0
0.0
15:15
15:30
11/10/2016
11/10/2016
1.68
PROD1
DRILL
T
PD BHA #14 with 0.5° AJO
0.0
72.0
15:30
17:10
�PULD
Weatehrford motor and new HYC bit.
Resistivity moved below the DGS.
Page 9/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Tme
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/10/2016
11/10/2016
1.88
PROD1
DRILL
TRIP
T
RBIH with open EDC pumping at
72.0
6,959.0
17:10
19:03
minimum rate. SOW = 7.9 K
11/10/2016
11/10/2016
0.36
PROD1
DRILL
DLOG
T
Log for K1 Marker and make
6,959.0
7,000.0
19:03
19:25
correction of + 6.5 FT.
Close EDC
11/10/2016
11/10/2016
0.87
PROD1
DRILL
TRIP
T
Resume RIH.............
7,000.0
8,685.0
19:25
20:17
WT CK @ 7,350'= 25K
Slow down to 28 fpm while in build
section........
11/10/2016
11/11/2016
3.71
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.28 bpm at 4272
8,685.0
8,853.0
20:17
00:00
psi. WOB = 1.2KIbs. CTW = 12.4 Klbs.
BHP = 4180 psi. ROP = 40 to 51 FPH
**Perform a BHA wiper trip right
before midnight to help clean out
hole........ having difficulty getting the
bit to turn.
11/11/2016
11/11/2016
1.00
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.28 bpm at 4272
8,853.0
8,886.6
00:00
01:00
psi. WOB = 2.2KIbs. CTW = 12.4 Klbs.
BHP = 4180 psi. ROP = 40 to 51 FPH
**Perform a BHA wiper trip right
before midnight to help clean out
hole........ having difficulty getting the
bit to turn. Now having to stack
considerable WOB to help facilitate
turning....... ...... Geo's can work with
what we're getting...........
11/11/2016
11/11/2016
0.94
PROD1
DRILL
WPRT
T
PUH slowly and confer with town
8,886.6
8,540.0
01:00
01:56
engineer and town GEO........... having
difficulty getting the bit to turn up with
trying numerous options ......... not
getting sufficent enough turn to
facilitate making our next target which
is critical. Waiting for town to decide
on course of action, so still PUH
slowly............ PUW = 27.31K
11/11/2016
11/11/2016
0.20
PROD1
DRILL
TRIP
T
Recieved word from town engineer to
8,540.0
8,886.0
01:56
02:08
proceed forward and "aggressively try
and make next target at 6,645". Start
RBIH SOW = 11.5
11/11/2016
11/11/2016
2.86
PROD1
DRILL
DRLG
T
BOBD. Pumping 1.18 bpm at 4072
8,886.0
8,986.0
02:08
05:00
psi. WOB = 3.1KIbs. CTW = -1.2 Klbs.
BHP = 4140 psi. ROP = 40 to 54 FPH
11/11/2016
11/11/2016
4.00
PROD1
DRILL
DRLG
T
OBD. Pumping 1.14 bpm at 3962 psi.
8,986.0
9,080.0
05:00
09:00
WOB = 2.3KIbs. CTW = -3.5 Klbs.
BHP = 4299 psi. ROP = 40 fph
11/11/2016
11/11/2016
1.50
PROD1
DRILL
DRLG
T
OBD. Pumping 1.14 bpm at 3962 psi.
9,080.0
9,098.0
09:00
10:30
WOB = 2.3KIbs. CTW = -3.5 Klbs.
BHP = 4300 psi. ROP decreasing to
<5fph.
Multiple pick ups and restarts to try
and improve ROP.
Page 10/37 Report Printed: 12/27/2016
E- ;- Operations Summary (with Timelog Depths)
IB -18
„y
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/11/2016
11/11/2016
3.00
PROD1
DRILL
TRIP
T
After discussion with town. Decision
9,098.0
68.0
10:30
13:30
made to POOH. PUW = 29 Klbs.
Jog 5" window area. Open EDC.
Continue out of the hole.
11/11/2016
11/11/2016
2.00
PROD1
DRILL
PULD
T
PJSM. PUD BHA#14.
68.0
0.0
13:30
15:30
11/11/2016
11/11/2016
2.25
PROD1
STK
PULD
T
PJSM. PD BHA #15, Anchored billet
0.0
72.0
15:30
17:45
assembly.
11/11/2016
11/11/2016
1.82
PROD1
STK
TRIP
T
RIH with Anchored Billet
72.0
6,959.0
17:45
19:34
Assembly ............
11/11/2016
11/11/2016
0.22
PROD1
STK
DLOG
T
Logging for K1 Marker and make
6,959.0
7,086.0
19:34
19:47
correction of - 3 ft correction.
11/11/2016
11/11/2016
0.17
PROD1
STK
TRIP
T
Continue RIH with Anchored Billett
7,086.0
7,350.0
19:47
19:57
11/11/2016
11/11/2016
0.06
PROD1
STK
TRIP
T
Stop here. Offline with pump. Close
7,350.0
7,350.0
19:57
20:01
EDC. WT CK = 27k
11/11/2016
11/11/2016
0.20
PROD1
STK
TRIP
T
Continue RIH with Anchored Billett
7,350.0
7,480.0
20:01
20:13
11/11/2016
11/11/2016
0.68
PROD1
STK
TRIP
T
Starting to get some noticable weight
7,480.0
7,480.0
20:13
20:54
bobbles after 7,456 ft. and eventually
setting down too much weight at 7,480
ft. Tried jogging through area and
other different options, but ultimately
could not get past 7,480 ft. Did not
want to get western with the billet due
to proximity to the window and
distance from target set depth. Confer
with town engineer and he agreed we
should POOH and do a clean up run.
Once OOH, we will do the BOP Test
before the clean up run.
11/11/2016
11/11/2016
0.90
PROD1
STK
TRIP
T
Start to POOH and dragging too much
7,480.0
7,383.0
20:54
21:48
weight ......... hopefully the dogs are not
sticking out........... work the billet up
and down slowly and are eventually
able to start POOH albeit slowly.......
11/11/2016
11/11/2016
0.12
PROD1
STK
TRIP
T
Stop here to open EDC and bring
7,383.0
7,383.0
21:48
21:55
pump online at .75 bpm.........
11/11/2016
11/12/2016
2.09
PROD1
STK
TRIP
T
Resume POOH pumping at .75 bpm,
7,383.0
72.3
21:55
00:00
CP = 2,442 PUW = 28k WHP = 841
BHP = 3,805
11/12/2016
11/12/2016
1.75
PROD1
STK
PULD
T
At surface. PUD and LD BHA #15.
68.2
0.0
00:00
01:45
11/12/2016
11/12/2016
1.50
PROD1
STK
PULD
T
Pull floats, MU nozzle. Stab on
0.0
0.0
01:45
03:15
lubricator. Flush stack.
11/12/2016
11/12/2016
0.75
PROD1
STK
BOPE
T
Pressure test inner reel valve and
0.0
0.0
03:15
04:00
pack off.
11/12/2016
11/12/2016
2.00
PROD1
STK
SVRG
T
Change out bales on TD. Grease
0.0
0.0
04:00
06:00
stack and choke manifold. Change out
4 foot riser.
11/12/2016
11/12/2016
10.50
PROD1
STK
BOPE
T
Perform BOP Test after PJSM and
0.0
06:00
16:30
after tree is serviced, stack flushed
out, coil displaced with water.
Restest master after greasing.
11/12/2016
11/12/2016
2.27
PROD1
STK
BOPE
T
BOP Test complete. P/U BHA #16
0.0
62.3
16:30
18:46 1
1
1
1w/2.80"
Ridge Set Mill
11/12/2016
11/12/2016
2.00
PROD1
STK
PULD
T
Pressure Deploy BHA #16
62.3
62.3
18:46
20:46
Page 11/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/12/2016
11/12/2016
1.93
PROD1
STK
TRIP
T
RIH pumping at .5 bpm with open
62.3
6,943.0
20:46
22:42
EDC
First 5 x 5 Gel sweep pumped......
11/12/2016
11/12/2016
0.40
PROD1
STK
DLOG
T
Log for K1 Marker and make
6,943.0
6,974.0
22:42
23:06
correction of -2 ft
11/12/2016
11/12/2016
0.08
PROD1
STK
TRIP
T
Continue RIH for clean out run
6,972.0
7,522.0
23:06
23:10
Second 5 x 5 gel pill launched
Close EDC at 7,380 ft............
Reciprocate pipe through 5" to clean
area while first pill is exiting coil......
First sweep back to shakers brought
cuttings to surface.
11/12/2016
11/13/2016
0.82
PROD1
STK
REAM
T
Hit hard tag at 7,522 ft. Reciprocate
7,522.0
7,546.0
23:10
00:00
pipe through this area trying to break
through...... pass 7,522 ft only to tag up
at 7,533 ft...............PUH and
RBIH...............pump third
sweep ............ getting about 2 feet
deeper with each bite ............ very slow
going ............. PUWs are between 25
and 35k
11/13/2016
11/13/2016
1.82
PROD1
STK
REAM
T
Still cleaning cuttings out of build
7,546.0
8,561.0
00:00
01:49
section by taking 50' bites after
breaking through last fill tag at 7,548
ft.
11/13/2016
11/13/2016
1.13
PROD1
STK
REAM
T
Tag something at 8,565.0 ft.
8,561.0
8,589.0
01:49
02:57
Slowly work past this depth and
continue RIH to 8,589 ft and unable to
go any further. PUW exceeded 50k
and - 15k on WOB............ ID of hole
seems to have swollen...... doesn't act
like fill. Confer with town engineer or
setting billet higher than 8,650 ft.
Waiting on return call with plan
forward.
11/13/2016
11/13/2016
3.05
PROD1
STK
TRIP
T
Engineer called back and said billet
8,589.0
62.0
02:57
06:00
would be set higher, but currently has
not decided on a depth yet. Continue
POOH chasing returns to surface as
planned (pumping sweeps, jogging
through 5" and again at surface).
Begin POOH. PUW = 27K Make
several jogs through 5.............
11/13/2016
11/13/2016
1.75
PROD1
STK
PULD
T
PUD and LD BHA #16. Packed clay
62.0
0.0
06:00
07:45
and cuttings observed in the mill junk
slot area.
11/13/2016
11/13/2016
1.75
PROD1
STK
PULD
T
PJSM. PD BHA #17, anchored billet
0.0
72.0
07:45
09:30
assembly.
11/13/2016
11/13/2016
1.75
PROD1
STK
TRIP
T
RIH with BHA #17.
72.0
6,960.0
09:30
11:15
11/13/2016
11/13/2016
0.25
PROD1
STK
DLOG
T
Log K1 for a -1.5 ft correction.
6,960.0
6,985.0
11:15
11:30
11/13/2016
11/13/2016
1.00
PROD1
STK
TRIP
T
Continue RIH with anchored billet.
6,985.0
8,462.0
11:30
12:30
Weight check at the window = 28KIbs
PUW.
Page 12/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
Start Depth
(W[3)
End Depth (ftKB)
11/13/2016
11/13/2016
0.25
PROD1
STK
WPST
T
Position billet on depth (TOB = 8450
8,462.0
8,462.0
12:30
12:45
ft, oriented 25° LOHS). Bring pump
up. Setting tool sheared at 4600 psi.
Set 5klbs down and confirmed set.
11/13/2016
11/13/2016
1.25
PROD1
STK
TRIP
T
POOH with BHA #17.
8,462.0
72.0
12:45
14:00
11/13/2016
11/13/2016
1.80
PROD1
STK
PULD
T
PJSM. PUD BHA#17.
72.0
0.0
14:00
15:48
11/13/2016
11/13/2016
1.35
PROD1
DRILL
PULD
T
PJSM, PD BHA #18 with 0.85° AKO
0.0
72.0
15:48
17:09
motor and RB HCC bit.
11/13/2016
11/13/2016
1.68
PROD1
DRILL
TRIP
T
RIH with EDC open pumping minimum
72.0
6,952.0
17:09
18:49
rate
11/13/2016
11/13/2016
0.21
PROD1
DRILL
DLOG
T
Log for K1 Marker and make
6,952.0
6,980.0
18:49
19:02
correction of -2 ft
11/13/2016
11/13/2016
0.88
PROD1
DRILL
TRIP
T
Resume RIH pumping at minimum
6,980.0
8,450.2
19:02
19:55
rate ....... RIW = 14.5K
11/13/2016
11/13/2016
1.97
PROD1
DRILL
KOST
T
Tag top of billet ........... PUH and
8,450.2
8,450.2
19:55
21:53
perform a 100' wiper trip to ensure
clean BHA......... RBI and lightly set
down on top of billet to begin
milling ........... having major wieght
transfer issues ........... 7 stalls so
far........... still trying different
tactics ........... too much friction and too
many stalls..........
11/13/2016
11/13/2016
0.35
PROD1
DRILL
WPRT
T
Perform a wiper trip to the window and
8,450.2
7,444.0
21:53
22:14
mix a lube pill to pump so as to be
back on bottom when pill comes out
11/13/2016
11/13/2016
0.40
PROD1
DRILL
TRIP
T
RBIH
7,444.0
8,449.2
22:14
22:38
11/13/2016
11/14/2016
1.36
PROD1
STK
KOST
T
BOBM. Still having weight transfer
8,449.2
8,449.2
22:38
00:00
issues and trying different tactics such
as different pump rates, backreaming
passes, wiper trips, different speeds,
changing tool face, etc. with no luck.
Still getting stalls. Have tried pumping
a 20 bbl lube pill which seems to be
helping somewhat.......
11/14/2016
11/14/2016
3.58
PROD1
STK
KOST
T
Continuing to try and kick off billet at
8,449.2
8,449.2
00:00
03:34
8,450 ft. Still working with lube pill and
trying different tactics. Have tried
backreaming, moving the tool face
orietation, different pump rates,
speeds and tried 3 different drillers.
Having weight transfer issues. Have
now pumped beads to help with
weight transfer... ..............
Page 13/37 Report Printed: 1212712016
Operations Summary (with Timelog Depths)
kik ax 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(WB)
End Depth (ftKB)
11/14/2016
11/14/2016
3.92
PROD1
STK
KOST
T
After the first 7 bbls of beads are out,
8,449.2
8,457.0
03:34
07:30
we start to get some weight
transfer.............able to gently tag billet
and start milling.............starting to lose
weight again.............PUH for a short
wiper and RBIH and try
again ........... impossible to get weight
transfer without beads .......... continue
drilling, but periodically lose
WOB ....... Multiple pick ups and
restarts.
Rate = 1.41 bpm, Circ Press = 3,541,
WHIP = 608, IA = 38, OA = 07, CTW =
13.9K, WOB = .08 to .46 k
11/14/2016
11/14/2016
2.50
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.5
8,457.0
8,508.0
07:30
10:00
bpm at 4000 psi. BHP = 4280 psi,
WOB = 0.5-0.8KIbs ROP 10-30 fph.
11/14/2016
11/14/2016
0.25
PROD1
DRILL
WPRT
T
PUH and dry drift kick off area. PUW =
8,508.0
8,450.0
10:00
10:15
26KIbs.
Dry drift clean.
11/14/2016
11/14/2016
3.25
PROD1
DRILL
WPRT
T
Continue to PUH into 5" casing and
8,450.0
7,050.0
10:15
13:30
jog area. Choke B plugging up with
cuttings and aluminum. Clean and
clear both Choke B and choke A.
Significant amount of aluminum
observed over the shakers.
11/14/2016
11/14/2016
1.00
PROD1
DRILL
WPRT
T
RBIH. Clean trip through window and
7,050.0
8,508.0
13:30
14:30
open hole.
11/14/2016
11/14/2016
1.00
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.45
8,508.0
8,574.0
14:30
15:30
bpm at 4300 psi. BHP = 4290 psi,
WOB = 1.0KIbs ROP 50-80 fph.
11/14/2016
11/14/2016
0.25
PROD1
DRILL
WPRT
T
PUH for short wiper to 8500, PUW =
8,574.0
8,574.0
15:30
15:45
27KIbs.
11/14/2016
11/14/2016
2.00
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.6
8,574.0
8,810.0
15:45
17:45
bpm at 4300 psi. BHP = 4290 psi,
WOB = 1.9KIbs ROP 20-50 fph.
11/14/2016
11/14/2016
2.75
PROD1
DRILL
WPRT
T
PUH for planned wiper trip. PUW =
8,810.0
7,808.0
17:45
20:30
27KIbs
11/14/2016
11/14/2016
0.50
PROD1
DRILL
WPRT
T
RBIH. SOW 11 Klbs.
7,808.0
8,809.0
20:30
21:00
11/14/2016
11/15/2016
3.00
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.6
8,809.0
8,910.0
21:00
00:00
bpm at 4300 psi. BHP = 4290 psi,
WOB = 1.9KIbs ROP 20-50 fph.
11/15/2016
11/15/2016
5.10
PROD1
DRILL
DRLG
T
Continue drilling ahead. Pumping 1.6
8,910.0
9,110.0
00:00
05:06
bpm at 4289 psi. BHP = 4320 psi,
WOB = 1.8KIbs ROP 20-80 fph.
Launch 5 x 5 Sweep pill prior to PUH
for wiper trip
11/15/2016
11/15/2016
1.77
PROD1
DRILL
WPRT
T
Perform wiper trip to 5" TT and
9,110.0
7,069.0
05:06
06:52
perform several jogs in 5 " casing
11/15/2016
11/15/2016
1.22
PROD1
DRILL
TRIP
T
Trip back in hole
7,069.0
9,110.0
06:52
08:05
11/15/2016
11/15/2016
5.98
PROD1
DRILL
DRLG
T
BOB drilling ahead. Pumping 1.5 bpm
9,110.0
9,374.8
08:05
14:04
at 4272 psi. BHP = 4294 psi, WOB =
1.2KIbs ROP 20-80 fph.
Page 14/37 Report Printed: 12/27/2016
F.
Operations Summary (with Timelog Depths)
IB -18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(WB)
End Depth (ftKB)
11/15/2016
11/15/2016
0.65
PROD1
DRILL
WPRT
T
Perform 1,000 ft wiper trip a little
9,374.8
8,360.0
14:04
14:43
earlier than planned due to losing
push ability..............pumped a sweep
pill..................pill brought back sticky
clay and some shale ...............
11/15/2016
11/15/2016
0.66
PROD1
DRILL
WPRT
T
Trip back in hole
8,360.0
9,374.8
14:43
15:22
"Note: Town engineer called and
would like us to keep an eye on two
hot spots and make note in WSR if
any issue noticed ........ 8,950 ft and
9,163 ft. Notified the day driller
Greg also.
11/15/2016
11/15/2016
5.62
PROD1
DRILL
DRLG
T
BOB drilling ahead. Pumping 1.65
9,374.9
9,469.0
15:22
21:00
bpm at 4172 psi. BHP = 4344 psi,
WOB = 1.0KIbs ROP 20-30 fph.
Swapping to new mud system (#4) at
9,389 ft. Around 1,500 ft on System #3
with .8% DS.
11/15/2016
11/15/2016
2.00
PROD1
DRILL
DRLG
T
OBD 1.65 bpm at 3,993 psi FS, BHP
9,469.0
9,500.0
21:00
23:00
4,355 psi, CWT -7k, WOB .9k, ROP 7,
weight transfer issue, high gama sinse
9,340 ft, confer with town, pumped 25
bbl Drill Zone pill, little help, make up
and pump staggered beaded pills.
11/15/2016
11/16/2016
1.00
PROW
DRILL
DRLG
P
9,500 ft OBD 1.65 bpm at 3,993 psi
9,500.0
9,516.0
23:00
00:00
FS, BHP 4,367 psi, WOB .8, ROP 20-
30
" Note: off trouble time
11/16/2016
11/16/2016
4.60
PROD1
DRILL
DRLG
P
OBD 1.65 bpm at 3,993 psi FS, BHP
9,516.0
9,582.0
00:00
04:36
4,368 psi, CWT -4.5k, WOB .8k,
continue staggered beaded pill
sweeps, several restarts, BHA wipers,
PUW's consistant 28k to 29k, pump
5x5 sweep
11/16/2016
11/16/2016
1.25
PROD1
DRILL
WPRT
P
Early wiper to window, PUW 29k,
9,582.0
7,069.0
04:36
05:51
Make several jogs in 5...........
11/16/2016
11/16/2016
0.25
PROD1
DRILL
WPRT
P
Wiper back in hole
7,069.0
7,410.0
05:51
06:06
11/16/2016
11/16/2016
0.20
PROD1
DRILL
DLOG
P
Log for RA Tag and make correction
7,410.0
7,428.0
06:06
06:18
of + 5 ft.
11/16/2016
11/16/2016
1.20
PROD1
DRILL
WPRT
P
Continue RBIH
7,428.0
8,889.0
06:18
07:30
11/16/2016
11/16/2016
1.30
PROD1
DRILL
WPRT
P
Having to work through tight spot from
8,889.0
8,956.0
07:30
08:48
8,889 to 8,946 ft..............changing tool
face and pump rates seemed to help.
Appeared to be more hole geometry
and swollen clays than cuttings until
we hit 8,946 ft where it looks like we
have a bed of cuttings ............ had a
12k overpull here....... town called and
said to work down throough area and
work back up cleaning up this tight
spot
Page 15/37 Report Printed: 12/27/2016
r Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftK6)
End Depth (ftKB)
11/16/2016
11/16/2016
0.70
PROD1
DRILL
WPRT
P
Town called back and said since we
8,956.0
9,582.0
08:48
09:30
made it through this tight area to head
to bottom and continue drilling until
they call back ............ heading to
bottom
11/16/2016
11/16/2016
8.50
PROD1
DRILL
DRLG
P
BOBD 1.60 bpm at 4,027 psi FS, BHP
9,582.0
9,701.0
09:30
18:00
4,325 psi, CWT -3.5k, WOB .5k,
continue staggered beaded pill
sweeps, several restarts, BHA wipers,
PUW's consistant 29k to 30k. Avg
ROP = 14 fph
11/16/2016
11/17/2016
6.00
PROD1
DRILL
DRLG
P
OBD 1.6 bpm at 4,190 psi FS, BHP
9,701.0
9,819.0
18:00
00:00
4,268 psi, CWT -9.8k, WOB .51k, ROP
18, continue beaded pills, PUW's 26k
to 28k, added 1 % LoTorc lube to
system, seeing better CWT .0k, WOB
1.1k to 1.5k, ROP 19
11/17/2016
11/17/2016
4.00
PROD1
DRILL
DRLG
P
Continue drilling ahead 1.6 bpm at
9,819.0
9,980.0
00:00
04:00
4,450 psi FS, BHP 4,370 psi,
CWT.0k, WOB 1 A k
11/17/2016
11/17/2016
0.40
PROD1
DRILL
WPRT
P
Wiper trip up hole 900 ft, PUW 26k
9,982.0
9,082.0
04:00
04:24
11/17/2016
11/17/2016
0.55
PROM
DRILL
WPRT
P
Wiper trip back in hole, slow speed to
9,082.0
9,982.0
04:24
04:57
30 fpm at .8 bpm to work past 9,465 ft
to 9,485 ft, continue in hole.
11/17/2016
11/17/2016
14.95
PROD1
DRILL
DRLG
P
BOBD 1.61 bpm at 4,417 psi FS, BHP
9,982.0
10,200.0
04:57
19:54
4,306 psi, CWT 3k, WOB .7k, ROP 10
to 30
11/17/2016
11/17/2016
1.20
PROM
DRILL
CIRC
P
10,200 ft. TD called, reciprocate pipe,
10,200.0
10,200.0
19:54
21:06
PUW 26k while pumping last of
beaded pill, build Hi/Lo vis sweeps,
pump 1 0x1 0 Lo/Hi sweep.
11/17/2016
11/17/2016
1.80
PROM
DRILL
WPRT
P
Chase sweeps to window, PUW 25k,
10,200.0
7,070.0
21:06
22:54
slow thru window 6 fpm at ,5 bpm.
11/17/2016
11/17/2016
0.95
PROD1
DRILL
WPRT
P
Jet/jog 5" 7,370 ft to 7,070 ft 2 times,
7,070.0
7,370.0
22:54
23:51
wait for heavy returns to clean up over
shaker, pump 10x10.
11/17/2016
11/18/2016
0.15
PROM
DRILL
WPRT
P
RBIH to 7,575 ft.
7,370.0
7,575.0
23:51
00:00
11/18/2016
11/18/2016
2.85
PROM
DRILL
WPRT
P
Continue RIH from 7,575 ft to 8,005 ft,
7,575.0
72.2
00:00
02:51
chase 1 0x1 0 sweeps to 5" and Jet/jog
5" 7,370 ft to 7,070 ft 2 times, wait for
returns to clean up, continue wiper to
swab, 200 ft jog at surface.
11/18/2016
11/18/2016
1.90
PROD1
DRILL
TRIP
P
Bump up, reset counters, RBIH to
72.2
6,940.0
02:51
04:45
confirm TD, DS pillow block
overheating, slow RIH speed to
troubleshoot.
11/18/2016
11/18/2016
0.20
PROD1
DRILL
DLOG
P
Tie in to K1 for minus 1.5 ft correction.
6,940.0
6,978.0
04:45
04:57
Pump 1 0x1 0 sweep
11/18/2016
11/18/2016
0.72
PROM
DRILL
TRIP
P
Continue RIH to EOB
6,978.0
7,896.0
04:57
05:40
11/18/2016
11/18/2016
0.92
PROD1
DRILL
WPRT
P
At EOB.chase sweep to window and
7,896.0
7,086.0
05:40
06:35
make several jogs in 5"
Page 16/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
�A
Y IB -18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (MB)
11/18/2016
11/18/2016
1.33
PROD1
DRILL
TRIP
P
RBIH to confirm TD
7,086.0
10,200.0
06:35
07:55
At 9,009' we tagged up, PUH reduce
pump rate to .5 and went through area
without a weight bobble................no
other issues seen to TD depth.
PUWs were are all in normal
range .....26k until we got to 10,180'
and then we had a 12k
overpull............ looks like TD is at
10,200.0
11/18/2016
11/18/2016
0.35
PROD1
DRILL
TRIP
P
On bottom and just started pumping
10,200.0
10,130.0
07:55
08:16
the liner running pill and waiting for pill
to reach bit ...............
11/18/2016
11/18/2016
2.97
PROD1
DRILL
TRIP
P
POOH laying in beaded liner pill to
10,130.0
92.0
08:16
11:14
surface and completion fluid (11.8
ppg). 50 fpm and PUW = 25K Paint
flags at 8,372 ft and at 5,572 ft.
11/18/2016
11/18/2016
0.64
FROM
DRILL
OWFF
P
At surface. Perform Flow Check.
92.0
92.0
11:14
11:52
Hold PJSM for laying down BHA #18.
Passing Flow Check
11/18/2016
11/18/2016
0.85
PROD1
DRILL
PULD
P
L/D BHA#18
92.0
0.0
11:52
12:43
1
11/18/2016
11/18/2016
1.45
COMPZ1
CASING
EQRP
P
Swap out bails after PJSM.
0.0
0.0
12:43
14:10
11/18/2016
11/18/2016
2.60
COMPZ1
CASING
PUTB
P
Start making up 55 joints 2 3/8"
0.0
11694.0
14:10
16:46
Slotted Liner
Note: Well Flowing BOP Drill
performed.
11/18/2016
11/18/2016
1.45
COMPZ1
CASING
PULD
P
MUAL1 liner assembly to BHA#19,
1,694.0
1,738.2
16:46
18:13
MU to CoilTrak, surface test
11/18/2016
11/18/2016
2.00
COMPZ1
CASING
RUNL
P
RIH with BHA #19, Tie in at flag for
1,738.2
8,519.0
18:13
20:13
minus 7 ft correction, PUW 28k, RBIH,
clean thru window and build section.
11/18/2016
11/19/2016
3.77
COMPZ1
CASING
RUNL
P
Start stacking, begin working liner
8,519.0
10,092.0
20:13
00:00
assembly down, breakover 35k, broke
free from 9,450 ft to 10,020 ft, work
liner hard, confer with town.
11/19/2016
11/19/2016
0.25
COMPZ1
CASING
RUNL
P
Continue working liner, unable to get
10,092.0
8,398.0
00:00
00:15
deeper than 10,092 ft, confer with
town, PUW 38k, WOB -4.8k. Release
off liner assembly at 1.2 bpm, PUW
32k, WOB -0.5k. reset counters. TOL
8,398 ft.
11/19/2016
11/19/2016
1.95
COMPZ1
CASING
TRIP
P
POOH pumping across the top.
8,398.0
44.2
00:15
02:12
11/19/2016
11/19/2016
0.55
COMPZ1
CASING
OWFF
P
On surface, flow check, good. PJSM-
44.2
44.2
02:12
02:45
LD BHA over dead well.
11/19/2016
11/19/2016
0.75
COMPZ1
CASING
PULD
P
LD BHA #19.
44.2
0.0
02:45
03:30
11/19/2016
11/19/2016
0.50
COMPZ1
CASING
BOPE
P
PJSM- Function test BOPE.
0.0
0.0
03:30
04:00
11/19/2016
11/19/2016
1.00
COMPZ1
CASING
PULD
P
PJSM- MU OH Anchored billet to BHA
0.0
73.0
04:00
05:00
#20, MU to CoilTrak, surface test,
DPS malfuntioning, unstab to change
out CoilTrak tools.
Page 17/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/19/2016
11/19/2016
0.93
COMPZ1
CASING
PULD
T
Swap CoilTrak tools.
73.0
73.0
05:00
05:55
11/19/2016
11/19/2016
2.50
COMPZI
CASING
RUNL
P
RIH with BHA #20, EDC open.
73.0
6,956.0
05:55
08:25
11/19/2016
11/19/2016
0.29
COMPZI
CASING
DLOG
P
Log for K1 Marker and make
6,956.0
6,982.0
08:25
08:43
correction of minus 1.5 ft
11/19/2016
11/19/2016
0.16
COMPZI
CASING
RUNL
P
Continue RIH with anchored billet
6,982.0
7,374.0
08:43
08:52
11/19/2016
11/19/2016
0.15
COMPZ1
CASING
RUNL
P
Stop here and close EDC and perform
7,374.0
7,374.0
08:52
09:01
a weight check.............WT CK = 26k
11/19/2016
11/19/2016
0.50
COMPZI
CASING
RUNL
P
Continue RIH with anchored billet
7,374.0
7,418.0
09:01
09:31
11/19/2016
11/19/2016
0.64
COMPZ1
CASING
RUNL
T
Tag hard at 7,918 ft with
7,918.0
7,918.0
09:31
10:10
billet .......... set down 3k and could not
get string weight back. Tried PUH 50 ft
and RBIH with no luck...............tried
several other options to no avail. Last
PUW was at 32k ......... Confer with
town engineer and decision made to
POOH and put on a 1.5 degree motor
and 2.80" Ridge Set Mill and clean out
the hole and tag TOL to determine
exact depth.
11/19/2016
11/19/2016
1.84
COMPZ1
CASING
TRIP
T
POOH with anchored billet after
7,918.0
80.6
10:10
12:00
opening EDC and bringing pumps
online at .7 bpm
11/19/2016
11/19/2016
0.68
COMPZ1
CASING
OWFF
T
At surface. Perform flow check.
80.6
80.6
12:00
12:41
11/19/2016
11/19/2016
0.40
COMPZ1
CASING
PULD
T
L/D BHA #20 BHA came back with
80.6
0.0
12:41
13:05
some sticky clay -like substance on
it..............
11/19/2016
11/19/2016
0.50
COMPZ1
CASING
PULD
T
P/U BHA #21 w/1.5 degree motor and
0.0
67.3
13:05
13:35
2.80" Ridge Set Mill
11/19/2016
11/19/2016
1.20
COMPZI
CASING
TRIP
T
RIH with EDC open pumping at .5
67.3
6,953.0
13:35
14:47
bpm
11/19/2016
11/19/2016
0.26
COMPZ1
CASING
DLOG
T
Log for K1 Marker and make
6,953.0
6,972.0
14:47
15:03
correction of minus 1.5 ft
11/19/2016
11/19/2016
0.12
COMPZ1
CASING
TRIP
T
Continue RIH
6,792.0
7,297.0
15:03
15:10
11/19/2016
11/19/2016
0.09
COMPZI
CASING
TRIP
T
Stop here and close EDC and perform
7,297.0
7,297.0
15:10
15:15
a weight check.............WT CK = 28k
11/19/2016
11/19/2016
0.31
COMPZ1
CASING
TRIP
T
Continue RIH
7,297.0
7,918.0
15:15
15:34
11/19/2016
11/19/2016
0.43
COMPZ1
CASING
REAM
T
Have passed where we were hung up
7,918.0
8,399.0
15:34
16:00
with the billet earlier ........... saw only
the slightest weight
bobble..............continuing creeping in
hole at 20 fpm..... offline with pump
and continue RIH to dry tag TOL at
8,399 ft ....................
11/19/2016
11/19/2016
0.85
COMPZ1
CASING
DISP
T
PUH slowly and bring pump online to
8,399.0
8,380.0
16:00
16:51
displace KWF with 8.8 Power -Pro
before pumping sweeps and cleaning
hole...........
Page 18137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
W` 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/19/2016
11/19/2016
2.65
COMPZ1
CASING
REAM
T
Start PUH now that KW IF has been
8,380.0
7,370.0
16:51
19:30
displace and begin hole cleaning
operations, work area 7,955 ft to 7,840
ft, pump 5x5, RBIH, chase sweep to
window, pump 2nd 5x5, jet/jog F-
7,370 ft to 7,070 ft, wait for sweeps to
come over shaker.
11/19/2016
11/19/2016
1.60
COMPZ1
CASING
TRIP
T
POOH, 200 ft jog at surface. PJSM-
7,370.0
62.3
19:30
21:06
PUD BHA
11/19/2016
11/19/2016
1.85
COMPZ1
CASING
PULD
T
On surafce, Attempt to PUD, unable to
62.3
62.3
21:06
22:57
bleed down, lower checks not holding,
PJSM- scope change, close Annular
and EDC, open bleed to pump, WHP
drops 1,170 psi to 800 psi,
troubleshoot, upper checks not
holding also, confer with town, PD
BHA#21 and RIH to kill well.
11/19/2016
11/19/2016
0.65
COMPZ1
CASING
TRIP
T
RBI with BHA#21, EDC open,
62.3
62.3
22:57
23:36
attempt flush upper floats 1.7 bpm
while RIH, decided to stop at 350 ft,
shut in well, bleed off to pumps, upper
QC's holding, POOH
11/19/2016
11/20/2016
0.40
COMPZ1
CASING
PULD
T
Bump up, space out, bleed back
62.3
62.3
23:36
00:00
pump, upper checks holding, PJSM-
PUD BHA #21 under 1st contingency,
close Annular, EDC closed.
Note: BHI 3.5 hrs down time.
11/20/2016
11/20/2016
3.35
COMPZ1
CASING
PULD
T
PUD BHA#21, close Annular, EDC
62.3
0.0
00:00
03:21
closed. LD mill and motor, LD upper
half, check connection torques, open
EDC, load PDL and MU anchored
billet.
11/20/2016
11/20/2016
1.50
COMPZ1
CASING
PULD
T
PJSM- PD OH Anchored billet BHA
0.0
72.9
03:21
04:51
#22, replace UQC floats, MU to
CoilTrak, surface test.
11/20/2016
11/20/2016
1.66
COMPZ1
CASING
TRIP
T
RIH with OH Anchored Billet (Shears
72.9
6,954.0
04:51
06:30
screws checked, pinned heavy,
16,960#, 23-28k shear)
11/20/2016
11/20/2016
0.20
COMPZ1
CASING
DLOG
T
Log for K1 Marker and make
6,954.0
6,980.0
06:30
06:42
correction of minus 1.0 ft.
11/20/2016
11/20/2016
0.15
COMPZ1
CASING
TRIP
T
Continue RIH with Anchored Billet with
6,980.0
7,372.0
06:42
06:51
open EDC pumping at minimum rate
11/20/2016
11/20/2016
0.55
COMPZ1
CASING
TRIP
T
Continue RIH with anchored
7,372.0
8,399.0
06:51
07:24
billet .......................
Note; Passed the problem area
around 7,918 ft with only a slight
weight bobble.................smooth
sailing down to TOL.......
11/20/2016
11/20/2016
0.28
COMPZ1
CASING
TRIP
P
Tag TOL with billet at 8,399 ft ...... set
8,399.0
8,387.2
07:24
07:41
down 3k ............ PUH to 24 k ........ bring
pump online and pump off of
billet ........... TOB at 8,387.25 ft, 150
degrees ROHS
11/20/2016
11/20/2016
1.80
COM Zi
CASING
TRIP
P
POOH pumping at 1.2 bpm .............
8,387.2
67.8
07:41
09:29
11/20/2016
11/20/2016
0.80
COMPZ1
CASING
PULD
P
At surface. Pressure Undeploy BHA
67.8
67.8
09:29
10:17
#22 after PJSM.
Page 19/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC
Time Log
Start Time
End Time
our (hr)
Phase
11/20/2016
11/20/2016
0.40
COMPZI C
10:17
10:41
Continue RIH
;e B,
Locking
11/20/2016
11/20/2016
0.55
PROD2 S
10:41
11:14
6,954.0
6,997.0
11/20/2016
11/20/2016
0.85
PROD2 S
11:14
12:05
CTW = 24K WOB =.54 K
11/20/2016
11/20/2016
1.10
PROD2 F
12:05
13:11
11/20/2016
11/20/2016
1.33
PROD2 S
13:11
14:31
11/20/2016
11/20/2016
0.18
PROD2 S
14:31
14:42
11/20/2016
11/20/2016
0.14
PROD2 S
14:42
14:50
11/20/2016
11/20/2016
0.15
PROD2 S
14:50
14:59
wipers, beads, varying speeds, rates
11/20/2016
11/20/2016
0.30
PROD2 S
14:59
15:17
11/20/2016
11/20/2016
1.50
PROD2 S
15:17
16:47
Code Activity Code Time P -T -X I Operation
G PULD P Lay down BHA #22
PULD P P/U BHA #23 w/ AKO .8
HCC 2.7 X 3.0" bit
PULD P Pressure Deploy BHA #:
JT SVRG P Service Rica ------- Servic
Rotate Top Drive, Change out
Job: DRILLING SIDETRACK
perform
Pin hose on ram.
P
RIH with open EDC pumping at
67.8
bpm
P
Log for K1 Marker and make
72.1
correction of minus 1.5 ft
P
Continue RIH
;e B,
Locking
72.1
P
Stop here and close EDC and
Job: DRILLING SIDETRACK
perform
Start Depth
(WEI)
End Depth (WB)
PROD2
67.8
0.0
x and
0.0
72.1
8,387.0
72.1
72.1
;e B,
Locking
72.1
72.1
.5
72.1
6,954.0
6,954.0
6,997.0
6,997.0
7,381.0
7,381.0
7,381.0
a weight check..WT CK = 26k
Continue RIH to billet
Tag TOB at 8,387.64 ft ......... PUH and
start creeping back in hole.............1.5
bpm CP = 3,797 WHP = 510 BHP
=4,272 CTW = 13.87 K WOB = .34
K
X87.0
11/20/2016
11/21/2016
7.21
PROD2
STK
KOST
P
OBD... ... 1.59 bpm Circ Press =
8,387.0
8,387.0
16:47
00:00
4,084 WHP = 510 BHP = 4,252
CTW = 24K WOB =.54 K
Having some weight transfer
issues...... have pumped a Hi -Lo Vis
pill and a beaded pill to help........ BHA
wipers, beads, varying speeds, rates
and trenching, engauged at 8,386.6 ft,
aluminum across shaker.
11/21/2016
11/21/2016
3.15
PROD2
STK
KOST
P
Kick off billet using beads, frequent
8,387.0
8,395.0
00:00
03:09
stalls due to stick slipping after
starting, 1.53 bpm at 3,800 psi FS,
BHP 4,250 psi, WHIP 495, IA 134, OA
0
11/21/2016
11/21/2016
0.50
PROD2
DRILL
DRLG
P
OBD 1.55 bpm at 3,800 psi FS, BHP
8,395.0
8,430.0
03:09
03:39
4,257 psi, CWT 13.8k, W0130.8k,
ROP 53
11/21/2016
11/21/2016
0.25
PROD2
DRILL
WPRT
P
Wiper up hole above billet to 8,300 ft,
8,430.0
8,430.0
03:39
03:54
PUW 26k, RBIH, dry drift billet area
clean.
11/21/2016
11/21/2016
6.80
PROD2
DRILL
DRLG
P
BOBD 1.61 bpm at 3,998 psi FS, BHP
8,430.0
8,750.0
03:54
10:42
4,268 psi, CWT 11.8k, WOB 1.0k,
ROP 40 to 80 fph
Report
' Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (MB)
11/21/2016
11/21/2016
1.45
PROD2
DRILL
WPRT
P
Once 5 x 5 sweep is out of bit, PUH
8,750.0
8,750.0
10:42
12:09
for a wiper trip to the 5".............make
several jogs in 5............
Town is also looking at the DLS data
to determine if we need to POOH and
change to a lesser degree
motor.............doglegs are coming in at
16 degrees instead of 12
degrees ...............
Jeff calls back and town has decided
to keep what we have on for
now.................DLS is trending
downward ..............
11/21/2016
11/21/2016
7.53
PROD2
DRILL
DRLG
P
BOBD 1.63 bpm at 4,359 psi FS, BHP
8,750.0
9,008.0
12:09
19:40
4,323 psi, CWT 10.8k, WOB 1.0k,
ROP 20 to 40 fph
Note: The two dog legs right before
1730hrs were both 16.4 and 18
degrees..........
11/21/2016
11/21/2016
2.00
PROD2
DRILL
WPRT
P
At 9,008 ft and having weight transfer
9,008.0
9,008.0
19:40
21:40
issues ... ......... current mud system has
around 1,400 ft and .8 DS ...... will try
and do a 1,000 ft wiper trip to see if
that helps before doing a mud
swap......... wiper trip did not
help......... start pumping a beaded
pill............
11/21/2016
11/22/2016
2.32
PROD2
DRILL
DRLG
P
BOBD 1.53 bpm at 4,357 psi FS, BHP
9,008.0
9,101.0
21:40
00:00
4,337 psi, CWT 6.3k, WOB 1.4k, ROP
20 to 50 fph
Note: We got weight transfer back
before the beaded pill exited the
no=le..............still on System #4
11/22/2016
11/22/2016
8.50
PROD2
DRILL
DRLG
P
OBD 1.5 bpm at 3,981 psi FS, BHP
9,101.0
9,410.0
00:00
08:30
4,292 psi, CWT -0.7k, WOB 2.0k,
ROP 30, WHP 478, IA 440, OA 0
Note: Mud swap with new mud out bit
at 9,242 ft.
11/22/2016
11/22/2016
2.00
PROD2
DRILL
WPRT
P
Wiper trip to window, PUW 25k, hole
9,410.0
7,070.0
08:30
10:30
loading up, 200 ft jog at EOB, Pulling
heavy thru build from 7,820 ft, clean
thru window, Jet/Jog 5", wait for
shaker to clean up, RBIH
11/22/2016
11/22/2016
0.15
PROD2
DRILL
DLOG
P
Log RA for a plus 4.0 ft correction.
7,070.0
7,429.0
10:30
10:39
11/22/2016
11/22/2016
0.75
PROD2
DRILL
WPRT
P
Wiper back in hole, clean thru build
7,429.0
9,410.0
10:39
11:24
and hole appears clean.
11/22/2016
11/22/2016
1.30
PROD2
DRILL
DRLG
P
BOBD 1.52 bpm at 4,055 psi FS, BHP
9,410.0
9,432.0
11:24
12:42
4,348 psi, CWT 6k, WOB 1.1 k, ROP
80. Lost all returns at 9,424 ft, PUW
28k, RBIH, restart 1.52 bpm at 4,055
FS, BHP 4,338 psi, CWT 6k, WOB
1.1k, ROP 99, healing starting at
9,445 ft.
Page 21/37 Report Printed: 12/27/2016
Y Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/22/2016
11/22/2016
5.50
PROD2
DRILL
DRLG
P
OBD 1.52 bpm at 4,055 psi FS, BHP
9,432.0
9,561.0
12:42
18:12
4,338 psi, CWT -8k, WOB 1.4k, ROP
3, hit Anchorite, slow drilling
11/22/2016
11/22/2016
1.30
PROD2
DRILL
DRLG
P
OBD 1.52 bpm at 4055 psi FS, BHP
9,561.0
9,629.0
18:12
19:30
4331, WHP 375, IA 367, OA 0
11/22/2016
11/22/2016
0.25
PROD2
DRILL
WPRT
P
200' wiper up hole, PUW
9,629.0
9,429.0
19:30
19:45
11/22/2016
11/22/2016
0.25
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW 5 k
9,429.0
9,629.0
19:45
20:00
11/22/2016
11/23/2016
4.00
PROD2
DRILL
DRLG
P
BOBD 1.52 bpm at 4055 psi FS, BHP
9,629.0
9,779.0
20:00
00:00
4350, WHP 373, IA 368, OA 6
11/23/2016
11/23/2016
0.75
PROD2
DRILL
DRLG
P
OBD 1.52 bpm at 4055 psi FS, BHP
9,779.0
9,810.0
00:00
00:45
4431, WHP 375, IA 368, OA 6
11/23/2016
11/23/2016
0.35
PROD2
DRILL
WPRT
P
Wiper up hole 1000', PUW 28 k
9,810.0
8,800.0
00:45
01:06
11/23/2016
11/23/2016
0.50
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW 9 k
8,800.0
9,810.0
01:06
01:36
11/23/2016
11/23/2016
7.95
PROD2
DRILL
DRLG
P
BOBD 1.52 bpm at 3860 psi FS, BHP
9,810.0
9,989.0
01:36
09:33
4326, WHP 359, IA 375, OA 0
11/23/2016
11/23/2016
2.00
PROD2
DRILL
WPRT
P
Wiper trip to window, PUW 27k, hole
9,989.0
7,070.0
09:33
11:33
loading up, 200 ft jog at EOB, Pulling
heavy 31 k thru build from 7,820 ft,
clean thru window, Jet/Jog 5", wait for
shaker to clean up, RBIH
11/23/2016
11/23/2016
0.25
PROD2
DRILL
DLOG
P
Log RA for a plus 4.5 ft correction.
7,070.0
7,430.0
11:33
11:48
11/23/2016
11/23/2016
0.95
PROD2
DRILL
WPRT
P
Wiper back in hole, clean thru build,
7,430.0
9,989.0
11:48
12:45
past billet and hole appears clean
RIW .
11/23/2016
11/23/2016
5.25
PROD2
DRILL
DRLG
P
BOBD 1.55 bpm at 4,100 psi FS, BHP
9,989.0
10,106.0
12:45
18:00
4,366 psi, CWT -3.7k, WOB, 1.2k,
WHP 373, IA 400, OA 0, BHA wiper at
9,949'
11/23/2016
11/24/2016
6.00
PROD2
DRILL
DRLG
P
Continue drilling ahead 1.52 bpm at
10,106.0
10,246.0
18:00
00:00
4,100 FS, BHP 4384, WHP 344, IA
461, OA 0, BHA wiper at 10,120',
10,165', 10,192', pumping beaded pills
11/24/2016
11/24/2016
3.25
PROD2
DRILL
DRLG
P
Continue drilling ahead on bottom, 1.4
10,246.0
10,299.0
00:00
03:15
bpm at 4200 psi, BHP 4371, WHP
366, IA 466, OA 0
11/24/2016
11/24/2016
0.50
PROD2
DRILL
WPRT
P
1000' Wiper up hole PUW 25 k
10,299.0
9,300.0
03:15
03:45
11/24/2016
11/24/2016
0.35
PROD2
DRILL
WPRT
P
Wiper back in hole. RIW 2 k
9,300.0
10,299.0
03:45
04:06
11/24/2016
11/24/2016
12.25
PROD2
DRILL
DRLG
P
BOBD 1.4 bpm at 3921 psi FS, BHP
10,299.0
10,688.0
04:06
16:21
4374, WHP 370, IA 436, OA 0, lots of
pick ups and beads, PUW's 25k to 27k
and clean. pump 10x10
11/24/2016
11/24/2016
2.50
PROD2
DRILL
WPRT
P
Wiper trip to window, PUW 25k, pull
10,688.0
7,410.0
16:21
18:51
up thru window jog the 5 inch up to
7,410'
11/24/2016
11/24/2016
0.25
PROD2
DRILL
DLOG
P
RIH , log the RA marker correction of
7,410.0
7,430.0
18:51
19:06
plus 5.5'
11/24/2016
11/24/2016
1.25
PROD2
DRILL
WPRT
P
Wiper back in hole RIW 1.5 k
7,430.0
10,688.0
19:06
20:21
11/24/2016
11/25/2016
3.65
PROD2
DRILL
DRLG
P
BOBD 1.35 bpm at 4060 psi FS, BHP
10,688.0
10,770.0
20:21
00:00
4470, WHP 408, IA 372, OA 0
Page 22/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
ter;.
�. 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/25/2016
11/25/2016
9.95
PROD2
DRILL
DRLG
P
OBD 1.35 bpm at 4,060 psi FS, BHP
10,770.0
10,900.0
00:00
09:57
4395, WHP 363, IA 367, OA 0, Lo-vis
sweeps folowed by lots of beads and
numerous pick ups, PUW's 28k to 31 k,
pumped last of beaded pill, MU Hi-vis
sweep
11/25/2016
11/25/2016
0.75
PROD2
DRILL
CIRC
P
TD called, reciprocate pipe, PUW 28k
10,900.0
10,900.0
09:57
10:42
while pumping last of beaded pill, build
Hi/Lo vis sweeps, pump 1 0x1 0 Lo/Hi
sweep.
11/25/2016
11/25/2016
2.10
PROD2
DRILL
WPRT
P
Chase sweeps to window, PUW 28k,
10,900.0
7,070.0
10:42
12:48
Jog at EOB, slow thru window 6 fpm
at 0.5 bpm.
11/25/2016
11/25/2016
1.15
PROD2
DRILL
WPRT
P
Jet/jog 5" from 7,370 ft to 7,070 ft 2
7,070.0
7,370.0
12:48
13:57
times, wait for returns to clean up over
shaker, pump 10x10.
11/25/2016
11/25/2016
0.55
PROD2
DRILL
WPRT
P
RBIH to 8,250 ft.
7,370.0
8,250.0
13:57
14:30
11/25/2016
11/25/2016
2.40
PROD2
DRILL
WPRT
P
Chase 1 0x1 0 sweeps to 5" and Jet/jog
8,250.0
72.2
14:30
16:54
5" fromm 7,370 ft to 7,070 ft, wait for
returns to clean up, continue wiper to
swab, 250 ft jog at surface.
11/25/2016
11/25/2016
1.60
PROD2
DRILL
TRIP
P
Bump up, reset counters, RBIH to
72.2
6,940.0
16:54
18:30
confirm TD
11/25/2016
11/25/2016
0.25
PROD2
DRILL
DLOG
P
Tie in to K1 for minus 1.0 ft correction.
6,940.0
6,980.0
18:30
18:45
Pump 1 0x1 0 sweep, jogged the build
section, jetted the 5 inch,
11/25/2016
11/25/2016
2.50
PROD2
DRILL
TRIP
P
Continue RIH, bobble at 10299', TF
6,980.0
10,900.0
18:45
21:15
stops rotated, PUH, RBIH clean with
drilled TF, confirmed TD 10,900'.
11/25/2016
11/26/2016
2.75
PROD2
DRILL
DISP
P
POOH laying in12.0 ppg liner running
10,900.0
4,167.0
21:15
00:00
pill with beads, painting EOP flags at
9,800' and 6,200'
11/26/2016
11/26/2016
1.00
PROD2
DRILL
TRIP
P
Continue POOH
4,167.0
72.1
00:00
01:00
11/26/2016
11/26/2016
0.75
PROD2
DRILL
OWFF
P
PJSM, check well for flow
72.1
72.1
01:00
01:45
11/26/2016
11/26/2016
1.00
PROD2
DRILL
PULD
P
LD drilling BHA# 23
72.1
0.0
01:45
02:45
11/26/2016
11/26/2016
0.30
COMPZ2
CASING
PUTB
P
Prep rig floor to run liner.
0.0
0.0
02:45
03:03
11/26/2016
11/26/2016
0.25
COMPZ2
CASING
SFTY
P
PJSM, to MU lower AL3-01 liner
0.0
0.0
03:03
03:18
section
** Note: Bit grade 8-6-LM-NX-1-BT-
TD, pictures are on the s:drive
11/26/2016
11/26/2016
2.95
COMPZ2
CASING
PUTB
P
MU Ported bullnose, 32 jts of slotted
0.0
1,044.7
03:18
06:15
liner and shorty to BHA #24, change
out checks, surface test.
11/26/2016
11/26/2016
2.00
COMPZ2
CASING
RUNL
P
RIH with AL3-01 lower liner assembly,
1,044.7
8,450.0
06:15
08:15
minus 6.0 ft at flag, continue RIH.
Page 23/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/26/2016
11/26/2016
3.00
COMPZ2
CASING
RUNL
T
Stacking 8,450 ft to 8,500 ft, PUW
8,450.0
9,910.0
08:15
11:15
30k, continue RIH, stacking at 9,800
ft, attempt to work down, loosing
ground to 9,669 ft, pump .4 bpm, work
to 9,775 ft, PU 225 ft, RIH 55 fpm to
9,910 ft, PUW 35k, loosing ground
getting back to 9,900 ft, PUH, RBIH to
9,906 ft, unable to work deeper,
loosing ground to 9,880 ft, confer with
town.
11/26/2016
11/26/2016
2.50
COMPZ2
CASING
TRIP
T
POOH for BOPE test and plan
9,910.0
1,044.7
11:15
13:45
forward, PUW 36k.
11/26/2016
11/26/2016
0.50
COMPZ2
CASING
OWFF
T
On surface, monitor well for flow,
1,044.7
1,044.7
13:45
14:15
PJSM- LD BHA over dead well.
11/26/2016
11/26/2016
0.75
COMPZ2
CASING
PULD
T
LD BHA #24, prep floors.
1,044.7
1,000.2
14:15
15:00
11/26/2016
11/26/2016
3.00
COMPZ2
CASING
PULL
T
PJSM- LD shorty, 32 jts slotted and
1,000.2
0.0
15:00
18:00
bullnose.
11/26/2016
11/26/2016
2.00
COMPZ2
CASING
CTOP
T
Flush surface lines and displace coil to
0.0
0.0
18:00
20:00
fresh water, grease choke manifold
11/26/2016
11/26/2016
3.25
COMPZ2
WHDBOP
BOPE
P
Start BOP testing, test witness waived
0.0
0.0
20:00
23:15
per state tester Lou Grimadli, 3,500
psi high/250 psi low/2,500 annular
preventor. Stab INJH test inner reel
valve, stripper
11/27/2016
11/27/2016
5.00
COMPZ2
WHDBOP
BOPE
T
Continue BOP testing, test witness
0.0
0.0
00:00
05:00
waived per state tester Lou Grimaldi,
3,500 psi high/250 psi low/2,500
annular preventor flowing BOP check
list.
11/27/2016
11/27/2016
3.00
COMPZ2
CASING
CTOP
T
RD test equipment, flush surface lines
0.0
0.0
05:00
08:00
and displace coil to 12.0 ppg
completion fluid, grease choke
manifold and stack
11/27/2016
11/27/2016
1.35
COMPZ2
CASING
PULD
T
PJSM, MU Cleanout BHA #25 with a
0.0
62.4
08:00
09:21
0.8° ako motor and D331 GEB, 2.79"
no/go, MU to CoilTrak, surface test.
11/27/2016
11/27/2016
1.40
COMPZ2
CASING
TRIP
T
RIH with clean out BHA #25
62.4
6,940.0
09:21
10:45
11/27/2016
11/27/2016
0.20
COMPZ2
CASING
DLOG
T
Tie in to K1 for minus 1.5 ft correction.
6,940.0
6,973.0
10:45
10:57
11/27/2016
11/27/2016
1.65
COMPZ2
CASING
TRIP
T
Continue RIH, close EDC, PUW
6,973.0
10,900.0
10:57
12:36
above window 27k, clean thru build,
some drag just past billet, clean past
9,910 ft, (15k CWT) confirm TD again
at 10,900 ft (10k CWT)
11/27/2016
11/27/2016
0.25
COMPZ2
CASING
SFTY
T
Confirm TD again at 10,900 ft (10k
10,900.0
10,900.0
12:36
12:51
CWT) confer with town, change of
scope, will not clean out, pump new
bedaded completion fluid to surface.
PJSM- change of scope.
11/27/2016
11/27/2016
5.50
COMPZ2
CASING
CIRC
T
Reciprocate pipe, PUW 29k, while
10,900.0
10,900.0
12:51
18:21
making up 100 bbl of 12.0 ppg beaded
liner pill, 2ppb beads, 3% Safe Lube,
and pumping to mill, pulled 34.5k at
9,905
11/27/2016
11/27/2016
3.00
COMPZ2
CASING
TRIP
T
Discuss plan forward, POOH from
10,900.0
62.4
18:21
21:21
10,570' displacing wellbore to beads,
beads to surface, continue POOH
pumping pipe displacement.
Page 24/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
r1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/27/2016
11/27/2016
0.50
COMPZ2
CASING
OWFF
T
Tag up at surface, PJSM, check well
62.4
62.4
21:21
21:51
for flow
11/27/2016
11/27/2016
0.65
COMPZ2
CASING
PULD
T
LD Cleanout BHA
62.4
0.0
21:51
22:30
11/27/2016
11/27/2016
0.50
COMPZ2
CASING
SFTY
T
Tools OOH, Prep to MU liner
0.0
0.0
22:30
23:00
assembly
11/27/2016
11/27/2016
0.75
COMPZ2
CASING
PUTB
T
MU 16 joints of slotted liner
0.0
505.6
23:00
23:45
11/27/2016
11/28/2016
0.25
COMPZ2
CASING
PULD
T
PU/MU BHI Coiltrak tools, w/ agitator
505.6
505.6
23:45
00:00
11/28/2016
11/28/2016
1.00
COMPZ2
CASING
PULD
T
Continue MU Coiltrak tools, surface
505.6
557.1
00:00
01:00
test
11/28/2016
11/28/2016
1.50
COMPZ2
CASING
RUNL
T
RIH, with AL3 -01 liner running BHA#
557.1
7,364.0
01:00
02:30
26 with agitator
11/28/2016
11/28/2016
0.25
COMPZ2
CASING
RUNL
T
Correct to the 6,700' EOP flag,
7,364.0
7,450.0
02:30
02:45
continue IH
11/28/2016
11/28/2016
0.25
COMPZ2
CASING
DLOG
T
Log the K1 correction of plus 5.0'
7,450.0
7,450.0
02:45
03:00
11/28/2016
11/28/2016
0.55
COMPZ2
CASING
RUNL
T
Continue RIH to bottom, no pumps, 35
7,450.0
9,110.0
03:00
03:33
fpm, BHP 4 450 psi, annular
increasing
11/28/2016
11/28/2016
1.30
COMPZ2
CASING
RUNL
P
Continue RIH to bottom (off trouble
9,110.0
10,900.0
03:33
04:51
time) on depth at 10,900 ft, release off
liner at 1.1 bpm at 5,000 psi BHA,
PUW 25k, liner appears to be off,
reset depths.
11/28/2016
11/28/2016
3.65
COMPZ2
CASING
TRIP
P
POOH, paint flags at 8,000 ft and
10,393.0
50.3
04:51
08:30
5,000 ft
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
OWFF
P
On surface, monitor well for flow.
50.3
50.3
08:30
09:00
PJSM- LD BHA over dead well
11/28/2016
11/28/2016
0.75
COMPZ2
CASING
PULD
P
LD BHA#26, remove agitator from
50.3
0.0
09:00
09:45
BHA, lower liner in hole.
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
RURD
P
Prep floors for liner run.
0.0
0.0
09:45
10:15
11/28/2016
11/28/2016
1.40
COMPZ2
CASING
PUTB
P
PJSM- MU ported bullnose, 38 jts
0.0
1,191.9
10:15
11:39
slotted, Shorty.
11/28/2016
11/28/2016
0.85
COMPZ2
CASING
PULD
P
PJSM- MU lower liner assemblyto
1,191.9
1,236.1
11:39
12:30
CoilTrak tools, surface test.
11/28/2016
11/28/2016
3.10
COMPZ2
CASING
RUNL
P
RIH with 1,192 ft AL3 -01 lower middle
1,236.1
8,130.0
12:30
15:36
liner BHA #27, correct to flag minus
3.5 ft, continue RIH, PUW 25k at
7,000 ft. continue RIH
11/28/2016
11/28/2016
0.15
COMPZ2
CASING
DLOG
P
Log K1 for plus 1.5 ft,
8,130.0
8,160.0
15:36
15:45
11/28/2016
11/28/2016
0.95
COMPZ2
CASING
RUNL
P
Continue RIH, 35 fpm at -350 psi over
8,160.0
10,145.0
15:45
16:42
BHP, pumps off.
11/28/2016
11/28/2016
0.65
COMPZ2
CASING
RUNL
P
Stacking at 10,145 ft, PUW 30k, work
10,145.0
10,392.0
16:42
17:21
liner to 10,392 ft, PUW 30k, release
off liner at 1.1 bpm at 4,711 psi, BHP
4,882 psi, 775 psi Diff. PUW 22k.
reset counters.
11/28/2016
11/28/2016
3.15
COMPZ2
CASING
TRIP
P
POOH pumping beaded completion
9,200.0
44.2
17:21
20:30
fluid paint EOP flags at 8,000 ft and
6,200 ft.
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
OWFF
P
On surface, monitor well for flow.
44.2
44.2
20:30
21:00
PJSM- LD BHA over dead well
11/28/2016
11/28/2016
0.50
COMPZ2
CASING
PULD
P
LD BHA 427
44.2
0.0
21:00
21:30
Page 25/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1 B-18
.��<:
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/28/2016
11/28/2016
0.25
COMPZ2
CASING
RURD
P
Prep floors for liner run
0.0
0.0
21:30
21:45
11/28/2016
11/28/2016
1.50
COMPZ2
CASING
PUTB
P
PJSM- MU ported bullnose, 35 jts
0.0
1,090.3
21:45
23:15
slotted, 10 ft solid pup jt and Shorty.
11/28/2016
11/29/2016
0.75
COMPZ2
CASING
PULD
P
PJSM- MU number 3 liner assembly to
1,090.3
1,134.5
23:15
00:00
BHA #28, MU to CoilTrak tools
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
PULD
P
continue to MU number 3 liner
1,134.5
1,134.5
00:00
00:15
assembly to CoilTrak tools, surface
test.
11/29/2016
11/29/2016
2.00
COMPZ2
CASING
RUNL
P
RIH with 1,092 ft AL3 -01 middle liner
1,134.5
7,334.5
00:15
02:15
BHA #27
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
RUNL
P
Correct to the EOP flag, continue IH
7,334.5
8,762.0
02:15
02:30
11/29/2016
11/29/2016
1.00
COMPZ2
CASING
RUNL
P
Set down minus 10 k CTSW, minus
8,762.0
9,201.0
02:30
03:30
1.9 k DHWOB, PUW 28 k, RBIH, at 45
fpm,
11/29/2016
11/29/2016
2.00
COMPZ2
CASING
TRIP
P
Remove liner length from BHA, POOH
9,201.0
55.1
03:30
05:30
11/29/2016
11/29/2016
0.50
COMPZ2
CASING
PULD
P
Check well for flow, PJSM for laying
55.1
55.1
05:30
06:00
down settting BHA
11/29/2016
11/29/2016
1.00
COMPZ2
CASING
PULD
P
LD BHA# 28, liner setting tools
55.1
0.0
06:00
07:00
11/29/2016
11/29/2016
0.75
COMPZ2
CASING
PULD
P
PU/MU OH anchored billet
0.0
0.0
07:00
07:45
11/29/2016
11/29/2016
0.50
COMPZ2
CASING
PULD
P
Discuss with town team concerns of
0.0
0.0
07:45
08:15
current fluid in hole, w/ running an OH
Anchored Billet.
11/29/2016
11/29/2016
1.25
COMPZ2
CASING
PULD
P
PJSM, LD billet, MU cleanout BHA
0.0
62.4
08:15
09:30
with a D331.
11/29/2016
11/29/2016
3.00
COMPZ2
CASING
TRIP
P
Tag up, reset counters, surface test
62.4
6,947.0
09:30
12:30
BHI Coiltrak tools. RIH, slowly keeping
annular below 350 psi over pressure
schedule, switching to 8.8 ppg drilling
fluid, at .15 bpm, BHP 4,600 psi
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
DLOG
P
log the K1 correction of minus 2.0'
6,947.0
6,970.0
12:30
12:45
11/29/2016
11/29/2016
1.25
COMPZ2
CASING
TRIP
P
Continue RIH
6,970.0
8,090.0
12:45
14:00
11/29/2016
11/29/2016
5.50
COMPZ2
CASING
DISP
P
Jog from 8,090'to 7,150', increasing
8,090.0
8,090.0
14:00
19:30
pump rate to 0.4 bpm, BHP 4,590 psi
displacing well to 8.8 ppg used flopro.
11/29/2016
11/29/2016
2.00
COMPZ2
CASING
TRIP
P
POOH, jogging before build and inside
8,090.0
500.0
19:30
21:30
5". Chase sweep out of the hole.
11/29/2016
11/29/2016
0.50
COMPZ2
CASING
TRIP
P
Open EDC, continue POOH. Tag up
500.0
56.0
21:30
22:00
and space out.
11/29/2016
11/29/2016
1.25
COMPZ2
CASING
PULD
P
PUD BHA#29.
56.0
0.0
22:00
23:15
11/29/2016
11/29/2016
0.25
COMPZ2
CASING
PULD
P
PU and PD BHA #30, anchored billet
0.0
0.0
23:15
23:30
assembly.
11/30/2016
11/30/2016
1.00
COMPZ2
CASING
PULD
P
Continue to PD BHA #30. Anchored
0.0
72.0
00:00
01:00
billet assembly.
11/30/2016
11/30/2016
1.75
COMPZ2
CASING
TRIP
P
RIH with anchored billet. SOW =
72.0
6,950.0
01:00
02:45
15KIbs
11/30/2016
11/30/2016
0.25
COMPZ2
CASING
DLOG
P
Log the K1 for a -2 ft correction.
6,950.0
61982.0
02:45
03:00
Page 26/37 Report Printed: 12/27/2016
v Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (WS)
11/30/2016
11/30/2016
0.75
COMPZ2
CASING
TRIP
P
Close EDC at the window. Continue
6,982.0
8,105.0
03:00
03:45
running in the hole with BHA #30. Tag
up at 8105 ft. PU and repeat tag at
8105 ft.
Bring up pump and set billet at 4700
psi, anchor oriented low side. Top of
billet at 8,094 ft.
11/30/2016
11/30/2016
2.25
COMPZ2
CASING
TRIP
P
POOH with BHA#30.
8,105.0
61.0
03:45
06:00
11/30/2016
11/30/2016
2.00
COMPZ2
CASING
PULD
P
PJSM, PUD, BHA# 30
61.0
0.0
06:00
08:00
11/30/2016
11/30/2016
3.00
PRODS
DRILL
SVRG
P
Install MM parts, simops repair
0.0
0.0
08:00
11:00
hydraulic seal in cellar.
11/30/2016
11/30/2016
1.50
PROD3
DRILL
PULD
P
PJSM, PD kickoff/drilling BHA
0.0
72.1
11:00
12:30
11/30/2016
11/30/2016
1.50
PRODS
DRILL
TRIP
P
RIH w/ AL3 kickoff/drilling BHA# 31,
72.1
6,947.0
12:30
14:00
0.8 ako motor and RB HYC bi-center
bit
11/30/2016
11/30/2016
0.25
PRODS
DRILL
DLOG
P
Log the K1 marker correction minus
6,947.0
6,957.0
14:00
14:15
1.5'
11/30/2016
11/30/2016
0.25
PRODS
DRILL
TRIP
P
Continue RIH to bottom
6,957.0
8,094.0
14:15
14:30
11/30/2016
11/30/2016
5.50
PRODS
STK
KOST
P
Dry tag TOB at 8093.8', PUW 28 k
8,094.0
8,115.0
14:30
20:00
Begin milling billet. Stacking CT
weight. Pump beads to assist kicking
off. Drill off billet to 8115f PUH, clean
dry drift through billet area.
11/30/2016
12/1/2016
4.00
PRODS
DRILL
DRLG
P
Continue drilling ahead, pumping 1.5
8,115.0
8,320.0
20:00
00:00
BPM, at 3860 psi. BHP = 4200 psi,
WHP = 498 psi. WOB 1.5-2 Klbs, ROP
= 20-70 FPH.
12/1/2016
12/1/2016
3.25
PRODS
DRILL
DRLG
P
Continue drilling ahead, pumping 1.5
8,320.0
8,490.0
00:00
03:15
BPM, at 3900 psi. BHP = 4200 psi,
WHP = 498 psi. WOB 1.5-2 Klbs, ROP
= 20-70 FPH.
12/1/2016
12/1/2016
0.25
PRODS
DRILL
WPRT
P
PUH for planned wiper trip. PUW =
8,490.0
8,110.0
03:15
03:30
26KIbs.
12/1/2016
12/1/2016
0.25
PRODS
DRILL
WPRT
P
RBIH. SOW = 13.5 Klbs
8,110.0
8,490.0
03:30
03:45
12/1/2016
12/1/2016
5.00
PRODS
DRILL
DRLG
P
BOBD, 1.4 bpm at 3,598 psi, BHP
8,490.0
8,805.0
03:45
08:45
4283, WHP 644
12/1/2016
12/1/2016
1.50
PROD3
DRILL
WPRT
P
Wiper up hole, PUW 25 k, jog the 5
8,805.0
7,393.0
08:45
10:15
inch
12/1/2016
12/1/2016
0.25
PRODS
DRILL
DLOG
P
RBIH, log the RA marker correction of
7,393.0
7,431.0
10:15
10:30
plus 3.0'.
12/1/2016
12/1/2016
0.75
PRODS
DRILL
WPRT
P
Wiper back in hole, RIW 11 k
7,431.0
8,805.0
10:30
11:15
12/1/2016
12/1/2016
6.75
PRODS
DRILL
DRLG
P
BOBD, 1.53 bpm at 3,712 psi, BHP
8,805.0
9,045.0
11:15
18:00
4,396, WHP 663, IA 200, OA 0
12/1/2016
12/2/2016
6.00
PRODS
DRILL
DRLG
P
Continue drilling ahead pumping 1.55
9,045.0
9,164.0
18:00
00:00
BPM at 4250 psi. BHP 4310 psi. IA
252, OA 0.
Beginning to have weight transfer
issues. Prepare pill pit for beaded pills.
Page 27/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
fi
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
12/2/2016
12/2/2016
5.00
PROD3
DRILL
DRLG
P
Continue drilling ahead pumping 1.55
9,164.0
9,245.0
00:00
05:00
BPM at 4150 psi. BHP 4430 psi. IA
265, OA 0.
Beginning to have weight transfer
issues. Begin pumping alternating
201bbl beaded pills, followed by 20bbi
mud from the active.
BHA wipers as required to maintain
weight transfer.
12/2/2016
12/2/2016
1.25
PROD3
DRILL
WPRT
P
Wiper up hole into the 5 inch. PUW 25
9,245.0
7,393.0
05:00
06:15
12/2/2016
12/2/2016
0.25
PROD3
DRILL
WPRT
P
RIH, to log RA
7,393.0
7,404.0
06:15
06:30
12/2/2016
12/2/2016
0.25
PROD3
DRILL
DLOG
P
Log the RA marker correction of plus
7,404.0
7,431.0
06:30
06:45
3.5'
12/2/2016
12/2/2016
0.75
PROD3
DRILL
WPRT
P
Wiper back in hole, RIW 14 k
7,431.0
9,245.0
06:45
07:30
12/2/2016
12/2/2016
6.00
PROD3
DRILL
DRLG
P
BOBD 1.4 bpm at 4,029 psi FS, BHP
9,245.0
9,322.0
07:30
13:30
4272, WHP 405, IA 289, OA 0,
pumping beads, mix up 45 bbl of
lubed pill (2% of each) no advantage
seen, continue pumping beaded pills,
12/2/2016
12/2/2016
3.00
PROD3
DRILL
DRLG
P
OBD 1.4 bpm at 4,025psi, BHP 4,284,
9,322.0
9,358.0
13:30
16:30
WHP 465, IA 357, OA 0
12/2/2016
12/2/2016
2.00
PROD3
DRILL
DRLG
P
OBD with beaded pills, 40/20 beads,
9,358.0
9,384.0
16:30
18:30
22 fph, 1 k- DHWOB, 0 k- CTSW 1.4
bpm at 4,313 psi, BHP 385, WHP 414,
IA 358, OA 0
12/2/2016
12/2/2016
4.25
PROD3
DRILL
DRLG
P
Continue drilling pumping 40bbl
9,384.0
9,437.0
18:30
22:45
beaded pills followed by 20 bbls of
mud from the active.
CTW =-5KIbs, W OB = 0.8 - 1.0KIbs
BHP 4350 psi. Multiple BHA wipers
required to maintain weight transfer.
12/2/2016
12/3/2016
1.25
PROD3
DRILL
WPRT
P
PUH for early wiper trip. Troubleshoot
9,437.0
9,223.0
22:45
00:00
mud pump #2.
12/3/2016
12/3/2016
1.50
PROD3
DRILL
WPRT
P
Continue wiper trip to the window.
9,223.0
7,220.0
00:00
01:30
Troubleshoot MP#1 and MP#2 while
pulling to the window.
12/3/2016
12/3/2016
1.50
PROD3
DRILL
WPRT
P
Jog the 5 inch, while troubleshooting
7,220.0
7,380.0
01:30
03:00
pump issues.
12/3/2016
12/3/2016
4.00
PRODS
DRILL
SVRG
T
PJSM, fill out proper permits, Tear
7,380.0
7,380.0
03:00
07:00
down pump # 2 and replace failed
seal, clear suction screen on pump #
1, and clear suction line,
12/3/2016
12/3/2016
0.25
PROD3
DRILL
DLOG
P
RIH, Log the RA marker correction of
7,380.0
7,430.0
07:00
07:15
plus 4.0', 7,410'-7,430'
12/3/2016
12/3/2016
1.25
PROD3
DRILL
TRIP
P
Wiper back in hole, RIW 14 k
7,430.0
9,430.0
07:15
08:30
12/3/2016
12/3/2016
2.00
PROD3
DRILL
WPRT
P
Clean hole from 9,420' up to 9,210',
9,430.0
9,437.0
08:30
10:30
lowering pump rate to 0.3 bpm to RIH,
up to 1.3 bpm PUH, RIH to drill ahead.
12/3/2016
12/3/2016
5.00
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 3,558 psi, BHP
9,437.0
9,440.0
10:30
15:30
4245, WHP 355, IA 229, OA 0,
pumping beaded pills, pumping new
mud pills, Multiple BHA wipers and
PU's to help improve weight transfer.
Page 28/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
IB -18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/3/2016
12/3/2016
4.00
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,100 psi, BHP
9,440.0
9,461.0
15:30
19:30
4300, WHP 500, IA 195, OA 0,
continue to pump beaded pills,
Multiple BHA wipers and PU's to help
improve weight transfer.
12/3/2016
12/3/2016
0.75
PROD3
DRILL
WPRT
P
PUH for BHA wiper to try and improve
9,461.0
9,461.0
19:30
20:15
weight transfer. Slight overpull at 9210
ft.
12/3/2016
12/4/2016
3.75
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,100 psi, BHP
9,461.0
9,495.0
20:15
00:00
4310, WHP 570, IA 195, OA 0,
Multiple BHA wipers and PU's to help
improve weight transfer.
Swap mud. New mud at the bit at
9470 ft. New mud at surface at 9478
ft.
12/4/2016
12/4/2016
7.75
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,100 psi, BHP
9,495.0
9,555.0
00:00
07:45
4340, WHP 550, IA 227, OA 0,
Multiple BHA wipers and PU's to help
improve weight transfer.
12/4/2016
12/4/2016
0.25
PROD3
DRILL
WPRT
P
Short wiper up hole, PUW 30 k
9,555.0
9,300.0
07:45
08:00
12/4/2016
12/4/2016
0.25
PROD3
DRILL
WPRT
P
Wiper back in hole RIW 8 k
9,300.0
9,555.0
08:00
08:15
12/4/2016
12/4/2016
2.00
PROD3
DRILL
DRLG
P
BOBD 1.3 bpm at 4,100 psi, BHP
9,555.0
9,565.0
08:15
10:15
4,334, WHP 589, IA 278, OA 0
12/4/2016
12/4/2016
2.00
PROD3
DRILL
DRLG
P
OBD 1.3 bpm at 4,092 psi, BHP
9,565.0
9,577.0
10:15
12:15
4,366, WHP 611, IA 286, OA 0,
pumping beaded pills again to assist
with weight transfer.
12/4/2016
12/4/2016
1.00
PRODS
DRILL
DRLG
P
OBD, 1.3 bpm at 4,113 psi, BHP
9,577.0
9,581.0
12:15
13:15
4379, WHP 608, IA 290, OA 0,
pumping 40 bbl beaded pill followed
by 20 bead -free mud.
12/4/2016
12/4/2016
1.10
PROD3
DRILL
WPRT
P
Wiper up hole, PUW 30 k, jog the 5
9,581.0
7,050.0
13:15
14:21
inch, 7,050' - 7390'.
12/4/2016
12/4/2016
1.75
PROD3
DRILL
TRIP
P
Discuss with town plan forward, due to
7,050.0
72.1
14:21
16:06
slow ROP, and weight transfer, POOH
for agitator.
12/4/2016
12/4/2016
2.40
PROD3
DRILL
PULD
P
Tag surface, PJSM, PUD drilling
72.1
0.0
16:06
18:30
BHA# 31.
Crew change. Prepare to function test
BOPE.
Bit grade 1 -1 -BU -A -X -I -BHA
12/4/2016
12/4/2016
1.00
PROD3
DRILL
BOPE
P
Function test BOPE. Perform post test
0.0
0.0
18:30
19:30
greasing on stack and choke valves.
12/4/2016
12/4/2016
0.75
PROD3
DRILL
SVRG
P
Service reel and injector.
0.0
0.0
19:30
20:15
12/4/2016
12/4/2016
2.25
PROD3
DRILL
PULD
P
PJSM. PU and PD BHA #32 with 0.7°
0.0
0.0
20:15
22:30
AKO motor, agitator and RB HYC bit.
12/4/2016
12/5/2016
1.50
PRODS
DRILL
TRIP
P
Bump up, reset counters, RIH. Close
0.0
4,827.0
22:30
00:00
EDC and shallow test agitator. Good
test. Continue in the hole.
12/5/2016
12/5/2016
0.50
PROD3
DRILL
TRIP
P
Continue to RIH with BHA #32.
4,827.0
6,955.0
00:00
00:30
12/5/2016
12/5/2016
0.25
PROD3
DRILL
DLOG
P
Tie-in to the K1 for no correction.
6,955.0
7,000.0
00:30
00:45
12/5/2016
12/5/2016
1.00
PROD3
DRILL
WPRT
P
Continue to RIH to bottom with BHA
7,000.0
9,581.0
00:45
01:45
#32.
Page 29/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/5/2016
12/5/2016
2.75
PROD3
DRILL
DRLG
P
BOBD. Pumping 1.3 bpm at 4400 psi.
9,581.0
9,600.0
01:45
04:30
BHP = 4320 psi. WOB = 0.6 Klbs.
ROP 5-8 fph.
12/5/2016
12/5/2016
8.25
PROD3
DRILL
DRLG
P
OBD, 1.3 bpm at 4,254 psi, BHP
9,600.0
9,653.0
04:30
12:45
4,382, WHP 573, IA 355, OA 0
12/5/2016
12/5/2016
0.25
PROD3
DRILL
WPRT
P
Short 100' BHA wiper up hole, PUW
9,653.0
9,653.0
12:45
13:00
25 k
12/5/2016
12/5/2016
2.50
PROD3
DRILL
DRLG
P
BOBD, 1.3 bpm at 4,370 psi, BHP
9,653.0
9,680.0
13:00
15:30
4,379, WHP 583, IA 334, OA 0
12/5/2016
12/5/2016
0.25
PROD3
DRILL
WPRT
P
Wiper up hole to 8,700', PUW 26 k
9,680.0
8,700.0
15:30
15:45
12/5/2016
12/5/2016
0.50
PROD3
DRILL
WPRT
P
Wiper back in hole RIW 12 k
8,700.0
9,680.0
15:45
16:15
12/5/2016
12/5/2016
1.75
PROD3
DRILL
DRLG
P
BOBD 1.3 bpm at 4,330 psi, BHP
9,680.0
9,687.0
16:15
18:00
4,390, WHP 587, IA 323, OA 0
12/5/2016
12/5/2016
0.50
PROD3
DRILL
WPRT
P
BHA Wiper. Difficulty getting back to
9,687.0
9,687.0
18:00
18:30
bottom.
12/5/2016
12/5/2016
2.00
PROD3
DRILL
DRLG
P
BOBD. 1.3 bpm at 4285 psi. BHP =
9,687.0
9,702.0
18:30
20:30
4360 psi. WOB 0-1.4 Klbs. ROP
<10fph. IA 348 psi OA = 0.
12/5/2016
12/5/2016
1.75
PROD3
DRILL
WPRT
P
PUH for wiper to the window. Pulled
9,702.0
7,400.0
20:30
22:15
heavy at 9367 ft and 9220 ft. Jog 5"
casing 2x.
12/5/2016
12/5/2016
0.25
PROD3
DRILL
DLOG
P
RBIH. Log RA for a +4 ft correction.
7,400.0
7,420.0
22:15
22:30
12/5/2016
12/5/2016
1.00
PROD3
DRILL
WPRT
P
Continue RIH. Took weight at 9207 ft,
7,420.0
9,702.0
22:30
23:30
9226 ft and 9406 ft.
12/5/2016
12/6/2016
0.50
PROD3
DRILL
DRLG
P
BOBD. 1.25 bpm at 4350 psi. BHP =
9,702.0
9,708.0
23:30
00:00
4360 psi. WOB 1.2 Klbs. ROP 15fph.
IA 348 psi OA = 0.
12/6/2016
12/6/2016
9.75
PROD3
DRILL
DRLG
P
Continue drilling ahead pumping 1.25
9,708.0
9,790.0
00:00
09:45
bpm at 4280 psi. BHP = 4340. IA
346psi, OA Opsi.
Begin pumping 20bbls beaded pills
followed by 20bbls mud from the
active.
BHA wipers as required to help
maintain weight transfer.
12/6/2016
12/6/2016
2.50
PROD3
DRILL
CIRC
P
TD called at 9790'. Wiper up hole and
9,790.0
8,870.0
09:45
12:15
circulate beaded pill out. Clean hole.
Build Hi/Lo vis sweeps.
12/6/2016
12/6/2016
1.00
PRODS
DRILL
WPRT
P
RBIH to TD at 9790'. Pump 10x10
8,870.0
9,790.0
12:15
13:15
Hi/Lo sweeps at 1.2 BPM and 4300
psi. IA 371 psi, OA 0 psi.
12/6/2016
12/6/2016
0.75
PROD3
DRILL
WPRT
P
Chase 10x10 sweep to 7060'.
9,790.0
7,060.0
13:15
14:00
Decrease rate to .5BPM through
window at 7400'. Increase rate back
to 1.3 BPM up to 7060'.
12/6/2016
12/6/2016
0.75
PROD3
DRILL
WPRT
P
RBIH past EOB to 7970'. Pump
7,060.0
7,970.0
14:00
14:45
10x10 sweep at 1.3 BPM and 4300
psi.
12/6/2016
12/6/2016
2.37
PROD3
DRILL
WPRT
P
PUH and chase sweep to window.
7,970.0
69.4
14:45
17:07
Decrease rate to .5BPM through
window at 7400'. Continue wiper to
swab.
12/6/2016
12/6/2016
1.64
PROD3
DRILL
TRIP
P
RBIH to confirm TD.
69.4
6,944.0
17:07
18:45
12/6/2016
12/6/2016
0.24
PRODS
DRILL
DLOG
P
Log for K1 Marker and make
6,944.0
6,980.2
18:45
19:00
correction of + .5 ft.
Page 30137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
t
x 1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (WB)
12/6/2016
12/6/2016
1.22
PRODS
DRILL
TRIP
P
Continue RIH to confirm
6,980.2
9,788.0
19:00
20:13
TD.............slight tag at 9,226 ft and
9,476 ft ..... confirmed TD is at 9,788 ft.
12/6/2016
12/7/2016
3.78
PRODS
DRILL
DISP
P
Start PUH and laying in liner running
9,788.0
78.1
20:13
00:00
pill which is 12 ppg Potassium
Formate with 2 ppg beads after pill
reaches the bit......... Paint
flags .......... at window and KW F with
beads is being laid in while
POOH...........
12/7/2016
12/7/2016
1.20
PRODS
DRILL
OWFF
P
At surface. Prep for flow check and
78.1
78.1
00:00
01:12
1
1 then perform a 30 minute flow check.
12/7/2016
12/7/2016
0.64
PRODS
DRILL
PULD
P
L/D BHA # 32.
78.1
0.0
01:12
01:50
Note: Bit Graded Out at 1 - 1 - bu - a -
x - i -ct - td
12/7/2016
12/7/2016
3.83
COMPZ3
CASING
PULD
P
PJSM and begin M/U 49 jts of liner.
0.0
1,545.6
01:50
05:40
P/U BHA #33 w/liner running
assembly.
12/7/2016
12/7/2016
2.00
COMPZ3
CASING
RUNL
P
RIH with BHA #33 and 49 jts of slotted
1,545.6
8,100.0
05:40
07:40
liner w/ non=ported bullnose. Tie in to
at flag for -5' correction. PUW 26K.
Continue RIH clean through window
and build section.
12/7/2016
12/7/2016
2.00
COMPZ3
CASING
RUNL
P
Start stacking weight at 8410', begin
8,100.0
9,787.0
07:40
09:40
working liner assembly down. Work
liner by varying speeds and pump
rates through tight spots at 8410',
8456', 8704', 8798', 8934', & 8976'.
Heavy PU weights throughout. Work
liner down to TD at 9787.4' pumping
min rate. PUW 30K. Stack down
WOB -8.51K. Release lower liner
assembly at 9785' pumping 1.2 BPM,
PUW 25K. Reset counter. TOL at
8284'.
12/7/2016
12/7/2016
2.90
COMPZ3
CASING
TRIP
P
POOH and paint window flag at 6644'.
9,787.0
43.9
09:40
12:34
Continue POOH pumping across top.
12/7/2016
12/7/2016
0.60
COMPZ3
CASING
OWFF
P
At surface. Prep for flow check and
43.9
0.0
12:34
13:10
then perform a 30 minute flow check.
Good.
12/7/2016
12/7/2016
2.50
COMPZ3
CASING
PULD
P
L/D BHA#33 over dead well. PJSM
0.0
705.8
13:10
15:40
and begin M/U 21 jts of liner. P/U BHA
#34 w/liner running assembly.
12/7/2016
12/7/2016
1.88
COMPZ3
CASING
RUNL
P
RIH w/ BHA#34 and 21 jts slotted liner
705.8
8,284.0
15:40
17:33
w/ ported bullnose.
12/7/2016
12/7/2016
0.33
COMPZ3
CASING
RUNL
P
Tag top of liner at 8,284 ft. PUH for a
8,284.0
7,620.0
17:33
17:52
weight check and then tag again.
Bring pump online and release off of
upper liner assembly. Top of liner now
at 7,620 ft.
12/7/2016
12/7/2016
5.70
COMPZ3
CASING
TRIP
P
PUH slowly and start to displace well
7,620.0
33.5
17:52
23:34
with 8.7 drilling fluid through the
GS...............pumping slow due to
annular pressure ....................after well
has been swapped over to drilling
fluid, pump a Hi / Lo sweep and chase
up to the 5" and make several jogs
and then chase sweep to surface.......
Page 31/37 Report Printed: 12/27/2016
v., t
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X.
Operation
(ftKB)
End: Depth (ftKB)
12/7/2016
12/8/2016
0.43
COMPZ3
CASING
TRIP
P
At surface. PJSM and then begin
33.5
33.5
23:34
00:00
Pressure Undeploy Operations.
12/8/2016
12/8/2016
0.80
COMPZ3
CASING
PULD
P
Pressure undeploy BHA # 34.
33.5
33.5
00:00
00:48
12/8/2016
12/8/2016
0.19
COMPZ3
CASING
PULD
P
L/DBHA #34.
33.5
0.0
00:48
00:59
12/8/2016
12/8/2016
0.30
COMPZ3
CASING
PULD
P
P/U BHA #35 w/Anchored Billet
0.0
72.9
00:59
01:17
12/8/2016
12/8/2016
1.35
COMPZ3
CASING
PULD
P
Pressure deploy BHA #35.
72.9
72.9
01:17
02:38
12/8/2016
12/8/2016
1.70
COMPZ3
CASING
TRIP
P
RIH w/anchored billet
72.9
6,950.0
02:38
04:20
12/8/2016
12/8/2016
0.19
COMPZ3
CASING
DLOG
P
Log K1 Marker and make a correction
6,950.0
6,980.0
04:20
04:31
of -1 ft
12/8/2016
12/8/2016
0.20
COMPZ3
CASING
TRIP
P
Continue RIH w/Anchored Billet
6,980.0
7,620.6
04:31
04:43
12/8/2016
12/8/2016
0.39
COMPZ3
CASING
TRIP
P
Tag top of liner at 7,620.6
6,620.6
6,609.6
04:43
05:07
ft... ......... release off of billet with no
issues..............TOB is at 7,608.6 ft.
12/8/2016
12/8/2016
1.50
COMPZ3
CASING
TRIP
P
POOH
6,609.6
72.9
05:07
06:37
12/8/2016
12/8/2016
1.00
COMPZ3
CASING
PULD
P
PJSM and PUD BHA# 35.
72.9
72.9
06:37
07:37
12/8/2016
12/8/2016
0.75
COMPZ3
CASING
PULD
P
L/D BHA#35
72.9
0.0
07:37
08:22
12/8/2016
12/8/2016
0.75
COMPZ3
CASING
PULD
P
P/U BHA#36
0.0
0.0
08:22
09:07
12/8/2016
12/8/2016
1.00
PROD4
DRILL
PULD
P
PJSM, PD kickoff/drilling BHA #36
0.0
72.2
09:07
10:07
12/8/2016
12/8/2016
1.55
PROD4
DRILL
TRIP
P
RIH w/ AL2 kickoff/drilling BHA# 36,
72.2
6,949.0
10:07
11:40
2.0 AKO motor and RB HCC bi-center
bit
12/8/2016
12/8/2016
0.23
PROD4
DRILL
DLOG
P
Log K1 marker for -1 ft. correction.
6,949.0
6,976.0
11:40
11:54
12/8/2016
12/8/2016
0.50
PROD4
DRILL
TRIP
P
Continue RIH.
6,976.0
7,610.0
11:54
12:24
12/8/2016
12/8/2016
1.10
PROD4
STK
KOST
P
Dry tag TOB at 7610', PUW 27K.
7,610.0
7,640.0
12:24
13:30
Begin milling billet, drill off billet to
7640'. PUH to 7582'. Dry drift clean
past billet area. No issues.
12/8/2016
12/8/2016
5.83
PROD4
DRILL
DRLG
P
Continue drilling ahead, pumping 1.3
7,640.0
7,981.0
13:30
19:19
BPM, at 3900 psi. BHP = 4200 psi,
WHP = 430 psi. WOB -1-1.5 Klbs,
ROP --50-80 FPH
12/8/2016
12/8/2016
1.59
PROD4
DRILL
WPRT
P
Having weight transfer
7,981.6
7,981.6
19:19
20:55
issues.............pump a 5 x 5 sweep
and chase up hole to 5.....jog this
area several times to clean up and
then RBIH
Note: Increased amount of cuttings
seen across shaker after wiper
12/8/2016
12/9/2016
3.08
PROD4
DRILL
DRLG
P
BOBD, pumping 1.4 BPM, at 4036 psi.
7,981.6
7,999.0
20:55
00:00
BHP = 4100 psi, WHP = 366 psi.
WOB -1-2.4 Klbs, ROP -8 to 10 FPH
Page 32/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/9/2016
12/9/2016
8.30
PROD4
DRILL
DRLG
P
Drilling ahead in 1 B-18 AL2 Build
7,999.0
8,054.0
00:00
08:18
section, pumping 1.4 BPM, at 4142
psi. BHP = 4100 psi, WHP = 500 psi.
WOB -2 - 2.9 Klbs, ROP -8 to 10
FPH
Note: Got back confirmed samples of
Ankorite at 01:15hrs
12/9/2016
12/9/2016
3.40
PROD4
DRILL
DRLG
P
Pump 5x5 sweep. PUW 26K.
8,054.0
8,085.0
08:18
11:42
Continue drilling ahead in build
section. ROP picking up to -10-
20FPH, 1.3 BPM, at 4000 psi, BHP
4200, WHP 415, WOB 2.5 Klbs.
12/9/2016
12/9/2016
0.10
PROD4
DRILL
SRVY
P
PU for geo survey. PUW 26K. Lower
8,085.0
8,068.0
11:42
11:48
pump rate to 1 BPM. Obtain clean
geo survey.
12/9/2016
12/9/2016
3.50
PROD4
DRILL
DRLG
P
BOBD, 1.3 BPM, 4100 psi, WHP 420,
8,068.0
8,090.0
11:48
15:18
BHP 4200, WOB 1.2KIbs, ROP -10
FPH, IA 383, OA 0. Pumping 5x5
sweeps and pick ups as needed.
12/9/2016
12/9/2016
0.50
PROD4
DRILL
DRLG
P
Drilled ahead to EOB at 8102.58 ft.
8,090.0
8,102.6
15:18
15:48
12/9/2016
12/9/2016
1.50
PROD4
DRILL
WPRT
P
Pumped final 1 0x1 0 sweep. Chased
8,102.6
72.9
15:48
17:18
to 7060. Decrease rate to .3 BPM
through window. RBIH and jog 5"
casing from 7040'-8090'. Continue
chase sweep out of hole.
12/9/2016
12/9/2016
1.68
PROD4
DRILL
PULD
P
PJSM and begin pressure undeploy
72.9
72.9
17:18
18:58
BHA #36
12/9/2016
12/9/2016
1.00
PROD4
DRILL
PULD
P
L/D BHA#36
72.9
0.0
18:58
19:58
12/9/2016
12/9/2016
2.02
PROD4
WHDBOP
BOPE
P
Prep (Stab back on well with nozzle
0.0
0.0
19:58
22:00
and jet on stack several times, grease
stack, etc.) for BOPE test.
12/9/2016
12/10/2016
2.00
PROD4
WHDBOP
BOPE
P
Start full bi-weekly BOPE test. Test
0.0
0.0
22:00
00:00
wiitness waived by Jeff Jones,
AOGCC.
12/10/2016
12/10/2016
5.00
PROD4
WHDBOP
BOPE
P
Complete full bi-weekly BOPE test
0.0
0.0
00:00
05:00
250 psi/3500 psi including inner reel
valve (6 hour test). No test failures.
12/10/2016
12/10/2016
1.12
PROD4
DRILL
CTOP
P
PJSM and prep to cut coil and perform
0.0
0.0
05:00
06:07
slack management. Remove CTC,
boot end of wire to seal for slack
management.
12/10/2016
12/10/2016
6.78
PROD4
DRILL
CTOP
P
Cut 1,600' of coil and 1,612' of aline.
0.0
0.0
06:07
12:54
Install boot end of wire and heat shrink
wrap. Perform slack management.
Cut an additional 100' of coil (Cut
1,700' total of coil and 1,612' total of
aline).
12/10/2016
12/10/2016
4.50
PROD4
DRILL
CTOP
P
Prep coil and re -head CTC, pull test
0.0
0.0
12:54
17:24
50k, re -head, install UQC, P/T 4,500
psi, displace coil to drilling fluid.
12/10/2016
12/10/2016
2.60
PROD4
DRILL
PULD
P
P/U BHA # 37 ( AL2 Lateral Drilling
0.0
72.8
17:24
20:00
BHA) and presure deploy
Page 33/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (MB)
12/10/2016
12/10/2016
1.00
PROD4
DRILL
EQRP
T
After pressure deploying and ready to
72.8
72.8
20:00
21:00
RIH, lost power to
tools ........... pressure undeploy,
troubleshoot, repair and pressure
deploy again.
Note: Problem was 1/4" of the eline at
the UQC was found to have been
scrapped bare and was shorting out.
Wire cut and reheaded.
12/10/2016
12/10/2016
1.40
PROD4
DRILL
TRIP
P
RIH with EDC open pumping at 1 bpm
72.8
6,950.0
21:00
22:24
to facilitate pushing slack forward.
12/10/2016
12/10/2016
0.22
PROD4
DRILL
DLOG
P
Log for K1 Marker and make
6,950.0
6,973.0
22:24
22:37
correction of minus 2 ft.
12/10/2016
12/10/2016
0.61
PROD4
DRILL
TRIP
P
Continue RIH (closed the EDC at
6,973.0
8,102.0
22:37
23:13
7,350 ft)
12/10/2016
12/11/2016
0.78
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.4 bpm Circ
8,102.0
8,172.0
23:13
00:00
Press 4,077 WHIP 379 BHP
4,223 WOB 1.6 klb ROP 64 to
88 fph
12/11/2016
12/11/2016
4.00
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.4 bpm Circ
8,172.0
8,326.7
00:00
04:00
Press 4,077 WHIP 379 BHP
4,223 WOB 1.6 klb ROP 64 to
88 fph
Note: Around 8,320 ft ROP slowed
drastically .......... Geo thinks it's the
fault...........
12/11/2016
12/11/2016
0.38
PROD4
DRILL
WPRT
P
Perform a 300 ft wiper trip to help
8,326.7
8,326.7
04:00
04:22
alliviate weight transfer
issues..............we are either in
ankorite or at the fault or
both..............we have pumped several
sweeps prior to PUH
12/11/2016
12/11/2016
4.41
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.5 bpm Circ
8,326.7
8,332.0
04:22
08:47
Press 4,215 WHIP 437 BHP
4,259 WOB 1.0 klb ROP 1 to 2
FPH. PU's as needed.
12/11/2016
12/11/2016
5.39
PROD4
DRILL
DRLG
P
ROP averaging 2-4 FPH. Drilling
8,332.0
8,347.1
08:47
14:10
ahead, 1.5 BPM, Circ 4100 psi, WHIP
342 psi, BHP 4210 psi, WOB 1.5-2
klbs.
12/11/2016
12/12/2016
9.83
PROD4
DRILL
DRLG
P
Continue drilling ahead at 3-5 FPH,
8,347.1
8,378.4
14:10
00:00
1.4 BPM, Circ 4115 PSI, WHIP 250
psi, BHP 4149 psi, WOB 1-3 klbs.
12/12/2016
12/12/2016
8.00
PROD4
DRILL
DRLG
P
Continue drilling ahead at 3-5 FPH,
8,378.4
8,400.0
00:00
08:00
1.4 BPM, Circ 4115 PSI, WHP 250
psi, BHP 4149 psi, WOB 1-3 klbs.
PU's and restarts as needed.
12/12/2016
12/12/2016
0.90
PROD4
DRILL
DRLG
P
Swap to mud system #8 (8.65 ppg
8,400.0
8,400.0
08:00
08:54
PowerPro SF) with new mud at the bit
at 8,400 ft and continue drilling ahead.
12/12/2016
12/12/2016
6.30
PROD4
DRILL
DRLG
P
Continue drilling ahead 3-5 FPH, 1.5
8,400.0
8,414.0
08:54
15:12
BPM, Circ 3950 psi, WHIP 505, BHP
4140 psi, WOB 2-3 Klbs. PU's and
restarts as needed. Adjust trip
schedule holding 11.8 ppg at window
to help with losses Geo samples
continue to show —15% ankorite.
Page 34137 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
IB -18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Time
End Time
Dur (hr)
Phase
Op Lode
Activity Code
Time P -T -X
Operation
Start Depth
(ftKB)
End Depth (ftKB)
12/12/2016
12/12/2016
4.28
PROD4
DRILL
DRLG
P
Continue drilling ahead -2-4 FPH, 1.5
8,414.0
8,421.2
15:12
19:28
BPM, Circ 4000 psi, WHP 500, BHP
4140 psi, WOB 2-3 Klbs. PU's and
restarts as needed.
12/12/2016
12/12/2016
0.40
PROD4
DRILL
TRIP
P
Discuss with town and decision made
8,421.2
8,200.0
19:28
19:52
to POOH for new motor and bit. PUW
26K.
12/12/2016
12/12/2016
2.00
PROD4
DRILL
TRIP
P
Pump 5x5 sweep and chase to
8,200.0
71.6
19:52
21:52
window at 7,393', Jog 5" casing from
7,060' to 7,373'. POOH w/ open EDC.
12/12/2016
12/12/2016
1.00
PROD4
DRILL
PULD
P
PJSM, PUD BHA#37.
71.6
71.6
21:52
22:52
Bit grade 7-5-bt-a-x-i-ct-pr
12/12/2016
12/12/2016
0.60
PROD4
DRILL
PULD
P
M/U BHA# 38 w/ Weatherford .5° AKO
71.6
71.6
22:52
23:28
motor and a SRFE3408MB7 HYC bit.
12/12/2016
12/13/2016
0.52
PROD4
DRILL
PULD
P
PJSM and start PD BHA#38.
71.6
71.6
23:28
00:00
12/13/2016
12/13/2016
0.40
PROD4
DRILL
PULD
P
Completed pressure deploying
71.6
71.6
00:00
00:24
BHA#38 w/.5° AKO Weathford motor
and a SRFE3408MB7 HYC bit.
12/13/2016
12/13/2016
1.40
PROD4
DRILL
TRIP
P
RIH with open EDC pumping at
71.6
6,945.0
00:24
01:48
minimum rate
12/13/2016
12/13/2016
0.27
PROD4
DRILL
DLOG
P
Log K1 Marker and make correction of
6,945.0
6,973.0
01:48
02:04
minus 2 ft
12/13/2016
12/13/2016
0.49
PROD4
DRILL
TRIP
P
Continue RIH with now closed EDC
6,973.0
8,422.0
02:04
02:33
pumping minimum rate.
12/13/2016
12/13/2016
1.55
PROD4
DRILL
DRLG
P
BOBD. Pumping at 1.41 bpm Circ =
8,422.0
8,446.0
02:33
04:06
4,248 WHP = 562 CTW = 13.66
ROP = 7 fph WOB = 2.24 klb
Note: Experiencing some severe
vibration issues once on bottom
drilling .........
Note: Aftyer 10 minutes on bottom
drilling, computer screens for DD goes
pink,,,,,,,,,, PUH and re -boot
computers ......... RBIH and continue
drilling .... 5 minute delay.
12/13/2016
12/13/2016
3.27
PROD4
DRILL
DRLG
P
Pumping at 1.39 bpm Circ = 4,078
8,446.0
8,510.0
04:06
07:22
WHP = 560 CTW = 6.30 ROP = 24
to 75 fph WOB = 2.24 klb
Note: We seemed to have broke
through after 8,440 ft. This is wher we
had our last stall and now the ROP is
increasing
12/13/2016
12/13/2016
1.80
PROD4
DRILL
WPRT
P
After 0700 hr morning meeting
8,568.0
7,080.0
07:22
09:10
engineer called and due to faulting
into the Miluveach Formation, pump a
10 x 10 sweep and chase up hole ( jog
5" several times ) and hopefully by
that time twon will have a decision on
a way forward (plug back or run liner).
PUH and pump a 10 x 10 sweep and
chase up hole once out of bit. PUW =
27 k.............Having issue with choke
periodically clogging ........... more clay
coming across shaker now ....... make
several jogs in 5"
Page 35/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
1B-18
Rig: NABORS CDR2-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(WB)
End Depth (ftKB)
12/13/2016
12/13/2016
1.10
PROD4
DRILL
TRIP
P
Another call from town and instructed
7,080.0
8,542.0
09:10
10:16
once completing jogs in 5", RBI and
pump another sweep and chase up
hole again as above whilst meetings
are being held on AL2 Lateral's
status.......
12/13/2016
12/13/2016
3.34
PROD4
DRILL
TRIP
P
BOB. After 5 x 5 exits bit plus a few
8,542.0
72.8
10:16
13:37
bbls, chase up hole, jog through 5"
again and chase to surface.
Note: Town called again and decision
made to run liner.
12/13/2016
12/13/2016
1.38
PROD4
DRILL
TRIP
P
At surface, RBIH to called TD to start
72.8
6,948.0
13:37
15:00
laying in liner running pill and then
KW F............
12/13/2016
12/13/2016
0.23
PROD4
DRILL
DLOG
P
Log the K1 Marker and make a
6,948.0
6,992.0
15:00
15:13
correction of minus 2 ft
12/13/2016
12/13/2016
0.92
PROD
DRILL
TRIP
P
Continue RIH to 8,230 ft ..............
6,992.0
8,230.0
15:13
16:09
12/13/2016
12/13/2016
2.35
PROD4
DRILL
DISP
P
After liner running pill gets to the bit
8,230.0
72.8
16:09
18:30
and above, start PUH and laying in pill
and then KW F. Paint flags at 6,900 ft
and 6,000 ft, continue laying in
beaded liner pill to surface.
12/13/2016
12/13/2016
0.50
PROD4
DRILL
OWFF
P
On surface, monitor well for flow,
72.8
72.8
18:30
19:00
PJSM- LD BHA over open hole.
12/13/2016
12/13/2016
0.85
PROD4
DRILL
PULD
P
LD BHA #38
72.8
0.0
19:00
19:51
12/13/2016
12/13/2016
0.65
COMPZ4
CASING
PUTB
P
Prep floors for liner run. PJSM-
0.0
0.0
19:51
20:30
running liner
12/13/2016
12/13/2016
1.95
COMPZ4
CASING
PUTB
P
MU AL2 liner assembly- bullnose, 21
0.0
1,202.2
20:30
22:27
jts slotted, Halliburton swell packer, 17
jts solids, 6 ft SBR deployment sleeve.
BOP drill. Clean floors.
12/13/2016
12/13/2016
0.90
COMPZ4
CASING
PUTB
P
PJSM- MU AL2 liner assembly to BHA
1,202.2
1,246.4
2227
2321
#39, MU to CoilTrac tools, surface
test.
12/13/2016
12/14/2016
0.65
COMPZ4
CASING
RUNL
P
RIH with AL2 liner assembly
1,246.4
3,990.0
23:21
00:00
12/14/2016
12/14/2016
1.40
COMPZ4
CASING
RUNL
P
Continue RIH, tie in at flag for minus
3,990.0
8,196.0
00:00
01:24
3.04 ft, PUW 26k, continue RIH, stack
at 8,058 ft, work liner down to 8,196 ft,
PUW 28k, WOB -2.7k,
12/14/2016
12/14/2016
0.20
COMPZ4
CASING
RUNL
P
Release off liner at 1.3 bpm, PUW
8,196.0
6,994.0
01:24
01:36
23k, WOB 2.6k, reset counters to bit
depth. Mid element of swell packer at
7,535 ft, TOP of SBR at 6,994 ft.
12/14/2016
12/14/2016
2.20
COMPZ4
CASING
DISP
P
Displace well to seawater, LRS on
6,994.0
6,994.0
01:36
03:48
site, PJSM with LRS
12/14/2016
12/14/2016
1.00
COMPZ4
CASING
TRIP
P
POOH pumping seawater to 2,500 ft.
6,994.0
2,500.0
03:48
04:48
LRS P/T lines and equipment.
12/14/2016
12/14/2016
1.20
COMPZ4
CASING
FRZP
P
2,500 ft. LRS pump 30 bbls diesel,
2,500.0
500.0
04:48
06:00
RDMO LRS. Open EDC at 500 ft
12/14/2016
12/14/2016
0.25
COMPZ4
CASING
TRIP
P
Continue POOH
500.0
42.8
06:00
06:15
12/14/2016
12/14/2016
1.40
COMPZ4
CASING
PULD
P
At surface, tagged up. Pressure
42.8
42.8
06:15
07:39
Undeploy after PJSM.
12/14/2016
12/14/2016
0.35
COMPZ4
CASING
PULD
P
L/D BHA # 39.
42.8
0.0
07:39
08:00
Page 36/37 Report Printed: 12/27/2016
Operations Summary (with Timelog Depths)
IB-18
Rig: NABORS CDR2-AC
Job:
DRILLING SIDETRACK
Time Log
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
Start Depth
(ftKB)
End Depth (ftKB)
12/14/2016
12/14/2016
1.00
DEMOB
WHDBOP
MPSP
P
Prep for BPV installment.
0.0
0.0
08:00
09:00
12/14/2016
12/14/2016
2.00
DEMOB
WHDBOP
MPSP
P
Valve Crew shows up and installs
0.0
0.0
09:00
11:00
BPV
12/14/2016
12/14/2016
5.00
DEMOB
WHDBOP
DISP
P
Pump corrosion Inhibitor through coil
0.0
0.0
11:00
16:00
and then blow down coil.
12/14/2016
12/14/2016
2.00
DEMOB
WHDBOP
RURD
P
Start rig move check list, blow down
0.0
0.0
16:00
18:00
steam lines, disconnect PUTZ,
remove mouse holes, etc....
12/14/2016
12/14/2016
2.00
DEMOB
WHDBOP
NUND
P
ND BOPE, torque checked, remove
0.0
0.0
18:00
20:00
kill and deployment lines.
"'Rig released at 20:00 on
12/14/2016.
Page 37/37
Report Printed:
12/27/2016
sConocoPhillip
ConocoPhillips (Alaska) Inc. -Kup1
Kuparuk River Unit
Kuparuk 1B Pad
1 B-18AL3-01
50-029-22472-63
Baker Hughes INTEQ
Definitive Survey Report
20 December, 2016
FeA
BAKER
HUGHES
.10" ConocoPhillips IKAaI
ConocoPhillips Definitive Survey Report BAKER
HUGHES
Company:
Project:
Site:
Well:
Wellbore:
Design:
ConocoPhillips (Alaska) Inc. -Kupl
Kuparuk River Unit
Kuparuk 1 B Pad
1B-18
1 B-18AL3-01
1 B-18AL3-01
Local Co-ordinate Reference: Well 1 B-18
TVD Reference: 1 B-18 @ 102.00usft
MD Reference: 1 B-18 @ 102.00usft
North Reference: True
Survey Calculation Method: Minimum Curvature
Database: EDM Alaska NSK Sandbox
Project
Kuparuk River Unit, North Slope Alaska, United States~
Map System:
US State Plane 1927 (Exact solution)
System Datum: Mean Sea Level
i
Geo Datum:
NAD 1927 (NADCON CONUS)
Using Well Reference Point
x
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Well
113-18
Well Position
+N/ -S 0.00 usft
Northing: 5,969,647.06 usft
Latitude:
70° 19'40.248 N
+E/ -W 0.00 usft
Easting: 550,148.90usft
Longitude:
149° 35 35.868 W
Position Uncertainty
0.00 usft
Wellhead Elevation: usft
Ground Level:
61.20 usft
Wellbore
1 B-18AL3-01
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
(nT) ti
BGGM2016 10/1/2016
18.01
80.96
57,551
Design
113-18AL
....... _
_....3-01
__
- -
Audit Notes:
Version:
1.0 Phase: ACTUAL
Tie On Depth: 8,350.60
Vertical Section:
Depth From (TVD)
+NI -S +E/ -W
Direction
(usft)
(usft) (usft)
(1)
40.80
0.00 0.00
90.00
Survey Program
Date 12/16/2016
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name Description
Survey
Start Date
Survey
End Date
469.67
6,897.50 1 B-18 (1 B-18)
MWD MWD - Standard
4/28/1994
4/28/1994
7,392.00
8,350.60 1B-18AL3PB1 (1B-18AL3PB1)
MWD MWD - Standard
11/5/2016
11/11/2016
8,387.00
10,872.23 113-18AL3-01 (113-18AL3-01)
MWD MWD - Standard
11/21/2016
11/25/2016
12/20/2016 9:01:25AM
Page 2
COMPASS 5000.1 Build 74
ConocoPhillips
FUS
ConocoPhillips
BAKER
Definitive Survey Report
UGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Well 1 B-18
Project:
Kuparuk River
Unit
TVD Reference:
1 B-18 @ 102.00usft
Site:
Kuparuk 1 B Pad
MD Reference:
18-18 @ 102.00usft
Well:
18-18
North Reference:
True
Wellbore:
1 B-18AL3-01
Survey Calculation Method:
Minimum Curvature
Design:
1 B-18AL3-01
Database:
EDM Alaska NSK Sandbox
Survey
MD
Inc Azi
TVD
TVDSS
+N/ -S
Map
+E/ -W
Map
DLS
Vertical
(usft)
(1)
V)
(usft)
(usft)
(usft)
Northing
(usft)
East;
Easting
(°/100')
Section
Survey Tool Name
Annotation
(ft)
(ft
(ft)
8,350.60
89.39
57.58
6,696.47
6,594.47
-2,412.00
422.76 5,967,238.17
550,587.73
1.42
422.76
MWD (2)
TIP
8,387.00
86.17
56.06
6,697.88
6,595.88
-2,392.10
453.20 5,967,258.27
550,618.03
9.77
453.20
MWD (3)
KOP
8,415.79
83.97
61.38
6,700.36
6,598.36
-2,377.21
477.70 5,967,273.32
550,642.43
19.93
477.70
MWD (3)
s 8,445.81
84.71
66.94
6,703.32
6,6D1.32
-2,364.20
504.57 5,967,286.52
550,669.22
18.59
504.57
MWD (3)
8,475.55
88.13
71.09
6,705.18
6,603.18
-2,353.57
532.28 5,967,297.32
550,696.84
18.06
532.28
MWD (3)
8,505.49
88.62
76.20
6,706.03
6,604.03
-2,345.15
560.99 5,967,305.94
550,725.49
17.14
560.99
MWD (3)
3 6,535.22
92.06
76.46
6,705.85
6,603.85
-2,338.12
589.87 5,967,313.16
550,754.32
11.60
589.87
MWD (3)
8,565.47
95.87
73.40
6,703.76
6,601.76
-2,330.28
619.00 5,967,321.19
550,783.40
16.14
619.00
MWD (3)
a 8,595.44
94.76
68.59
6,700.98
6,598.98
-2,320.57
647.21 5,967,331.10
550,811.54
16.40
647.21
MWD (3)
k 8,625.50
94.37
64.18
6,698.59
6,596.59
-2,308.57
674.65 5,967,343.28
550,838.90
14.68
674.65
MWD (3)
8,655.37
94.09
59.81
6,696.38
6,594.38
-2,294.58
700.95 5,967,357.44
550,865.10
14.62
700.95
MWD (3)
8,685.47
92.40
56.22
6,694.68
6,592.68
-2,278.67
726.43 5,967,373.52
550,890.47
13.16
726.43
MWD (3)
8,715.22
89.69
53.75
6,694.14
6,592.14
-2,261.60
750.79 5,967,390.75
550,914.71
12.32
750.79
MWD (3)
8,745.15
86.99
51.70
6,695.00
6,593.00
-2,243.48
774.59 5,967,409.02
550,938.39
11.32
774.59
MWD (3)
8,775.29
84.06
49.34
6,697.36
6,595.36
-2,224.38
797.78 5,967,428.27
550,961.45
12.47
797.78
MWD (3)
1
8,805.40
84.56
53.07
6,700.34
6,598.34
-2,205.62
821.13 5,967,447.19
550,984.67
12.44
821.13
MWD (3)
8,835.07
84.69
57.56
6,703.12
6,601.12
-2,188.81
845.41 5,967,464.16
551,008.84
15.07
845.41
MWD (3)
8,865.19
83.82
63.04
6,706.14
6,604.14
-2,173.97
871.43 5,967,479.18
551,034.76
18.33
871.43
MWD (3)
8,895.15
8
84.65
67.64
6,709.15
6,607.15
-2,161.53
898.52 5,967,491.79
551,061.76
15.53
898.52
MWD (3)
8,925.25
84.03
66.55
6,712.12
6,610.12
-2,149.88
926.11 5,967,503.63
551,089.26
4.15
926.11
MWD (3)
8,955.01
2
84.16
62.54
6,715.18
6,613.18
-2,137.16
952.83 5,967,516.53
551,115.90
13.41
952.83
MWD (3)
@@p
8,985.36
84.93
57.88
6,718.07
6,616.07
-2,122.15
979.04 5,967,531.71
551,142.01
15.49
979.04
MWD (3)
9,015.81
86.28
59.49
6,720.40
6,618.40
-2,106.37
1,004.98 5,967,547.66
551,167.84
6.89
1,004.98
MWD (3)
t
E
9,045.49
88.00
63.33
6,721.88
6,619.88
-2,092.19
1,031.00 5,967,562.01
551,193.76
14.16
1,031.00
MWD (3)
9,075.07
(,
88.10
67.53
6,722.89
6,620.89
-2,079.90
1,057.88 5,967,574.48
551,220.56
14.19
1,057.88
MWD (3)
e
u 9,105.53
87.76
71.54
6,723.99
6,621.99
-2,069.26
1,086.39 5,967,585.31
551,248.99
13.20
1,086.39
MWD (3)
9,137.69
87.23
76.39
6,725.40
6,623.40
-2,060.39
1,117.26 5,967,594.39
551,279.80
15.16
1,117.26
MWD (3)
d
9,165.61
88.03
79.82
6,726.55
6,624.55
-2,054.64
1,144.56 5,967,600.32
551,307.05
12.60
1,144.56
MWD (3)
�
9,195.50
88.62
83.94
6,727.43
6,625.43
-2,050.42
1,174.13 5,967,604.73
551,336.59
13.92
1,174.13
MWD (3)
{ 9,228.61
90.15
90.27
6,727.78
6,625.78
-2,048.75
1,207.18 5,967,606.62
551,369.62
19.67
1,207.18
MWD (3)
k
1212012016 9:01:25AM
Page 3
COMPASS 5000.1 Build 74
ConocoPhillips FGa9
ConocoPhillips Definitive Survey Report HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup1
Project:
Kuparuk River Unit
Site:
Kuparuk 1 B Pad
Well:
1B-18
Wellbore:
1 B-18AL3-01
Design:
1 B-18AL3-01
Survey
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 1 B-18
1 B-18 @ 102.00usft
1 B-18 @ 102.00usft
True
Minimum Curvature
EDM Alaska NSK Sandbox
MD
Inc
Azi
ND
NDSS
+N/ -S
+E/ -W
Map
Map
DLS
Vertical
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
Northing
Easting
(°/100' )
Section Survey Tool Name Annotation
(ft)
(ft)
(ft)
9,255.25
93.93
92.00
6,726.83
6,624.83
-2,049.28
1,233.79
5,967,606.28
551,396.24
15.60
1,233.79 MWD (3)
9,285.30
98.82
93.55
6,723.50
6,621.50
-2,050.72
1,263.61
5,967,605.03
551,426.06
17.06
1,263.61 MWD (3)
9,315.59
99.69
97.27
6,718.63
6,616.63
-2,053.54
1,293.36
5,967,602.41
551,455.83
12.46
1,293.36 MWD (3)
4 9,345.41
a
99.47
102.87
6,713.66
6,611.66
-2,058.68
1,322.30
5,967,597.47
551,484.80
18.53
1,322.30 MWD (3)
t 9,375.52
100.66
108.44
6,708.39
6,606.39
-2,066.67
1,350.84
5,967,589.67
551,513.39
18.64
1,350.84 MWD (3)
9,405.68
1DD.03
113.24
6,702.97
6,600.97
-2,077.22
1,378.56
5,967,579.30
551,541.18
15.79
1,378.56 MWD
r
(3)
9,435.55
95.69
111.92
6,698.89
6,596.89
-2,088.58
1,405.87
5,967,568.13
551,568.56
15.17
1,405.87 MWD (3)
G 9,465.58
95.16
108.97
6,696.05
6,594.05
-2,099.02
1,433.88
5,967,557.87
551,596.64
9.94
1,433.88 MWD (3)
f 9,495.69
95.22
106.22
6,693.33
6,591.33
-2,108.08
1,462.46
5,967,549.00
551,625.28
9.10
1,462.46 MWD (3)
9,525.45
95.63
101.51
6,690.51
6,588.51
-2,115.18
1,491.22
5,967,542.10
551,654.08
15.82
1,491.22 MWD (3)
1 9,555.61
92.92
100.22
6,688.26
6,586.26
-2,120.85
1,520.75
5,967,536.63
551,683.64
9.95
1,520.75 MWD (3)
9,585.45
93.41
100.18
6,686.62
6,584.62
-2,126.13
1,550.07
5,967,531.55
551,713.00
1.65
1,550.07 MWD (3) #
9,615.41
94.39
105.31
6,684.58
6,582.58
-2,132.72
1,579.22
5,967,525.15
551,742.18
17.39
1,579.22 MWD (3)
9,645.47
91.69
107.04
6,682.98
6,580.98
-2,141.08
1,608.04
5,967,516.98
551,771.06
10.66
1,608.04 MWD (3)
9,675.23
90.55
112.42
6,682.40
6,580.40
-2,151.12
1,636.04
5,967,5D7.13
551,799.12
18.48
1,636.04 MWD (3)
{ 9,705.35
92.95
117.15
6,681.48
6,579.48
-2,163.74
1,663.36
5,967,494.70
551,826.53
17.60
1,663.36 MWD (3)
ri 9,735.22
94.52
120.59
6,679.53
6,577.53
-2,178.12
1,689.46
5,967,480.49
551,852.72
12.64
1,689.46 MWD (3) e
9,765.39
94.67
122.68
6,677.12
6,575.12
-2,193.90
1,715.07
5,967,464.89
551,878.42
6.92
1,715.07 MWD (3)
9,795.23
97.73
121.24
6,673.89
6,571.89
-2,209.60
1,740.23
5,967,449.36
551,903.69
11.32
1,740.23 MWD (3)
9,825.31
97.51
117.75
6,669.90
6,567.90
-2,224.27
1,766.18
5,967,434.86
551,929.73
11.52
1,766.18 MWD (3)
9,855.05
94.76
115.01
6,666.72
6,564.73
-2,237.41
1,792.66
5,967,421.90
551,956.30
13.02
1,792.66 MWD (3)
9,885.41
93.16
112.22
6,664.63
6,562.63
-2,249.54
1,620.41
5,967,409.96
551,984.13
10.57
1,820.41 MWD (3)
v 9,915.10
89.66
110.19
6,663.90
6,561.90
-2,260.27
1,848.08
5,967,399.41
552,011.86
13.63
1,848.08 MWD (3)
9,945.11
85.75
109.17
6,665.10
6,563.10
-2,270.37
1,876.30
5,967,389.50
552,040.15
13.46
1,876.30 MWD (3)
9,975.05
85.88
105.75
6,667.28
6,565.28
-2,279.33
1,904.78
5,967,380.74
552,068.69
11.40
1,904.78 MWD (3)
10,005.26
85.64
102.45
6,669.52
6,567.52
-2,286.66
1,934.00
5,967,373.59
552,097.95
10.92
1,934.00 MWD (3)
10,035.22
88.19
99.71
6,671.13
6,569.13
-2,292.41
1,963.35
5,967,368.04
552,127.34
12.48
1,963.35 MWD (3)
10,065.31
88.74
96.06
6,671.94
6,569.94
-2,296.54
1,993.14
5,967,364.12
552,157.15
12.26
1,993.14 MWD (3)
10,095.63
90.06
92.55
6,672.26
6,570.26
-2,298.81
2,023.37
5,967,362.04
552,187.39
12.37
2,023.37 MWD (3)
10,125.40
89.60
88.85
6,672.34
6,570.34
-2,299.18
2,053.13
5,967,361.88
552,217.15
12.52
2,053.13 MWD (3)
10,155.19
91.14
86.22
6,672.15
6,570.15
-2,297.90
2,082.89
5,967,363.36
552,246.90
10.23
2,082.89 MWD (3)
12/20/2016 9:01:25AM
Page 4
COMPASS 5000.1 Build 74
--
ConocoPhillips
ConocoPhillips
TVD
TVDSS
Definitive Survey Report
Company: ConocoPhillips (Alaska) Inc. -Kupl
Local Co-ordinate Reference:
Project: Kuparuk River Unit
TVD Reference:
Site: Kuparuk 1B Pad
MD Reference:
Well: 1 B-18
North Reference:
Wellbore: 18-18AL3-01
Survey Calculation Method:
Design: 1 B-18AL3-01
Database:
Survey
va_
FIAP.I
BAKER
HUGHES
Well 1 B-18
s
1 B-18 @ 102.00usft
1 B-18 @ 102.00usft
True (
Minimum Curvature
EDM Alaska NSK Sandbox
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Map
Map
DLS
Vertical
(usft)
(1)
(1)
(usft)
(usft)
(usft)
(usft)
rth
Northing
East
(°l100')
Section
Section
Survey Tool Name
(ft;
(ft)
10,185.17
94.92
87.03
6,670.57
6,568.57
-2,296.13
2,112.77
5,967,365.32
552,276.77
12.89
2,112.77
MWD (3)
10,215.17
97.08
86.98
6,667.43
6,565.43
-2,294.57
2,142.57
5,967,367.08
552,306.54
7.20
2,142.57
MWD (3)
10,245.23
95.32
93.78
6,664.18
6,562.18
-2,294.78
2,172.43
5,967,367.08
552,336.41
23.24
2,172.43
MWD (3)
10,276.51
96.77
91.86
6,660.89
6,558.89
-2,296.31
2,203.5D
5,967,365.75
552,367.48
7.66
2,203.50
MWD (3)
10,306.34
97.92
91.05
6,657.07
6,555.07
-2,297.06
2,233.07
5,967,365.20
552,397.06
4.70
2,233.07
MWD (3)
10,335.15
98.88
84.67
6,652.86
6,550.86
-2,296.00
2,261.54
5,967,366.45
552,425.51
22.16
2,261.54
MWD (3)
10,365.71
98.56
80.01
6,648.22
6,546.22
-2,291.97
2,291.46
5,967,370.68
552,455.41
15.11
2,291.46
MWD (3)
10,395.40
97.05
76.63
6,644.19
6,542.19
-2,286.02
2,320.26
5,967,376.82
552,484.17
12.37
2,320.26
MWD (3)
10,425.49
94.86
78.53
6,641.07
6,539.07
-2,279.58
2,349.49
5,967,383.45
552,513.34
9.61
2,349.49
MWD (3)
10,455.21
94.36
83.24
6,638.68
6,536.68
-2,274.89
2,378.73
5,967,388.34
552,542.55
15.89
2,378.73
MWD (3)
10,485.40
95.57
87.78
6,636.07
6,534.07
-2,272.53
2,408.71
5,967,390.90
552,572.51
15.51
2,408.71
MWD (3)
10,515.15
94.58
92.43
6,633.43
6,531.43
-2,272.59
2,438.33
5,967,391.04
552,602.13
15.92
2,438.33
MWD (3)
10,545.23
92.98
95.39
6,631.45
6,529.45
-2,274.64
2,468.27
5,967,389.19
552,632.08
11.17
2,468.27
MWD (3)
1D,575.11
88.89
96.81
6,630.96
6,528.96
-2,277.81
2,497.97
5,967,386.22
552,661.80
14.49
2,497.97
MWD (3)
10,605.55
89.33
100.52
6,631.43
6,529.43
-2,282.40
2,528.05
5,967,381.83
552,691.91
12.27
2,528.05
MWD (3)
10,635.50
89.65
104.21
6,631.65
6,529.65
-2,288.81
2,557.30
5,967,375.62
552,721.20
12.44
2,557.30
MWD (3)
10,665.23
90.03
108.76
6,631.68
6,529.68
-2,297.24
2,585.8D
5,967,367.37
552,749.75
15.32
2,585.80
MWD (3)
10,695.23
89.82
103.27
6,631.72
6,529.72
-2,305.52
2,614.63
5,967,359.29
552,778.63
18.31
2,614.63
MWD (3)
10,725.15
88.19
102.98
6,632.24
6,530.24
-2,312.31
2,643.76
5,967,352.70
552,807.80
5.53
2,643.76
MWD (3)
10,755.43
89.54
101.31
6,632.84
6,530.84
-2,318.68
2,673.36
5,967,346.53
552,837.43
7.09
2,673.36
MWD (3)
10,785.21
91.75
97.42
6,632.50
6,530.50
-2,323.52
2,702.73
5,967,341.88
552,866.84
15.02
2,702.73
MWD (3)
10,815.23
92.73
93.39
6,631.33
6,529.33
-2,326.35
2,732.59
5,967,339.25
552,896.71
13.81
2,732.59
MWD (3)
10,845.09
92.98
89.78
6,629.84
6,527.84
-2,327.17
2,762.39
5,967,338.63
552,926.52
12.10
2,762.39
MWD (3)
10,872.23
92.83
86.84
6,628.47
6,526.47
-2,326.37
2,789.48
5,967,339.61
552,953.60
10.83
2,789.48
MWD (3)
10,900.00
92.83
86.84
6,627.09
6,525.10
-2,324.84
2,817.18
5,967,341.32
552,981.28
0.00
2,817.18
PROJECTED to TD
Annotation
12/20/2016 9.01:25AM Page 5 COMPASS 5000.1 Build 74
THE STATE
"ALASK
GOVERNOR BILL WALKER
Kai Starck
CTD Director
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
Alaska Gil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 113-18AL3-01
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 216-156
Surface Location: 500' FNL, 292' FEL, Sec. 8, Tl 1N, RI OE, UM
Bottomhole Location: 2868' FNL, 2369' FEL, Sec. 10, Tl 1N, RI OE, UM
Dear Mr. Starck:
Enclosed is the approved application for permit to redrill the above referenced service well.
The permit is for a new wellbore segment of existing well Permit No. 188-110, API No. 50-103-
20097-00-00. Production should continue to be reported as a function of the original API number
stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this J day of November, 2016.
STATE OF ALASKA
AL A OIL AND GAS CONSERVATION COMM JN
PERMIT TO DRILL
,)n nor or, nnr
1 a. Type of Work:
1b.. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑
1 c. Specify if well is proposed or:
Drill ❑ Lateral " ❑✓
Stratigraphic Test ❑ Development - Oil El ° Service - Winj ❑ Single Zone 0 "
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket 0 • Single Well ❑
11. Well Name and Number:
ConocoPhillips Alaska Inc
Bond No. 5952180 ,
U 1B-18AL3-01 "
3. Address:
6. Proposed Depth: Im
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 11300- TVDS% 6574
Kuparuk River Field / Kuparuk Oil Pool
4a. Location of Well (Governmental Section):
7. Property Designation (Lease Number):
Surface: 500' FNL, 292' FEL, Sec 9, Tl l N, R10E, UM
ADL 25648
Top of Productive Horizon:
8. Land Use Permit:
13. Approximate Spud Date:
3120' FNL, 214' FEL, Sec 9, T11 N, R10E, UM
ALK 466
11/19/2016
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
2868' FNL, 2369' FEL, Sec 10, T1 IN, R10E, UM
2560
17730'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 102
15. Distance to Nearest Well Open
Surface: x- 550147 y- 5969648 Zone -4 e
GL Elevation above MSL (ft): 61.2
Ito Same Pool: 308' (113-17)
16. Deviated wells: Kickoff depth: 7950 feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 95.1 degrees
Downhole: 3005 Surface: 2347
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade Coupling Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.7# L-80 ST -L 2900
7930 6712 11300 6676 N/A
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
7824' 6941' 7809' 6929'
Casing Length Size Cement Volume MD TVD
Conductor/Structural 78' 16" 200 sx ASI 121' 121'
Surface 4215' 7-5/8" 650 sx AS] 1[, 300 sx G 4256' 4148'
Intermediate
Production 7783' 5"x5.5" 210 sx G 7809' 6929'
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft):
7131'- 7194', 7246'-7575' 6400'-6448', 6507'-6741'
20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis El
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑✓ 20 AAC 25.050 requirements
21. Verbal Approval: Commission Representative: 11/18/2016
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not
Jeff Connelly- 263-4112
be deviated from without prior written approval. Contact
Email Ieff.s.con nellvCa�cop.com
Printed Name Kai Starck Title CTD Director
Signature Phone 263-4093 Date
Commission Use Only
Permit to Drill —{
�I
API Number:
1 Permit Approval
See cover letter for other
Number: is 1p
50-®a 3—QO
Date: % f Ie b
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Other: U v S z5C>l— Samples req'd: Yes ❑ No [✓j Mud log req'd: Yes ❑ No [�
H2S measures: Yes [� No ❑ Directional svy req'd: Yes X No ❑
Spacing exception req'd: Yes ❑ No x Inclination -only svy req'd: Yes ❑ No X
X_r- f Z 0 ,44C Z !� G / S— r vi,,11 "1 � Post initial injection MIT req'd: Yes ❑ No ❑
APPROVED BY /
Approved by: COMMISSIONER THE COMMISSION Date:
Submit Form and
Form 10-401 Revised 11/2015 Thispermit is valid for 24 months from the date of approval 20 AAC 25.005
nmnw A I rm
ConocoPhillips
p
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
November 18, 2016
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
RECEIVED
NOV 18 2016
Due to difficult faulting encountered in the drilling of the KRU 1 B-18AL1 lateral (PTD 216-109) a new lateral (1 B-
18AL3-01) will be required in order to achieve the original goals of the project. AOGCC approval is required as
this is a request for an additional lateral. The 1 B-18AL3-01 lateral will target the same A4 fault blocks to the east
originally targeted by the 1 B-18AL1 lateral (PTD 216-109).
A 10-401 application for PTD and well -plan are attached for your review.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC
25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being
limited to 500' from the original point for all laterals of this project including 1 B-1 8A, 1 B-18AL1, 1 B-18AL2, 1 B-
18AL3, & 1 B-18AL3-01.
If you have any questions or require additional information, please contact me at 907-263-4112.
Sincerely,
Jeff Connelly
ConocoPhillips Alaska
Coiled Tubing Drilling Engineer
��
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kupl
Kuparuk River Unit
Kuparuk 113 Pad
IB -18
1 B-18AL3-01
Plan: 1 B-18AL3-01_wp01
Standard Planning Report
17 November, 2016
WO
BAKER
HUGHES
✓ ConocoPhillips WE..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Project:
Kuparuk River Unit
Site:
Kuparuk 1 B Pad
Well:
1B-18
Wellbore:
1 B-18AL3-01
Design:
1B-18AL3-01_wp01
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1B-18
Mean Sea Level
1 B-18 @ 102.00usft
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site
Kuparuk 1 B Pad
Site Position:
Northing:
5,969,646.72 usft Latitude:
70° 19'40.290 N
From:
Map
Easting:
549,457.40 usft Longitude:
149° 35'56.056 W
Position Uncertainty:
0.00
usft Slot Radius:
0.000 in Grid Convergence:
0.38 °
Well
113-18
Well Position
+N/ -S
0.00 usft Northing:
5,969,647.06 usft Latitude:
70° 19'40.248 N
+E/ -W
0.00 usft Easting:
550,148.90 usft Longitude:
1490 35'35.868 W
Position Uncertainty
0.00 usft Wellhead Elevation:
usft Ground Level:
61.20 usft
Wellbore
1 B-18AL3-01
Magnetics
Model Name
Sample Date
Declination Dip Angle
Field Strength
(nT)
BGGM2016
10/1/2016
18.01 80.96 57,551
Design
1B-18AL3-01_wp01
Audit Notes:
Version:
Phase: PLAN
Tie On Depth:
7,930.48
Vertical Section:
Depth From (TVD)
+N/ -S +E/ -W
Direction
(usft)
(usft) (usft)
(°)
-61.20
0.00 0.00
129.79
11/17/2016 5:10:44PM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips reA..
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup1
Project:
Kuparuk River Unit
Site:
Kuparuk 1 B Pad
Well:
1B-18
Wellbore:
1 B-18AL3-01
Design:
1 B-18AL3-01_wp01
Local Co-ordinate Reference:
Well 1 B-18
TVD Reference:
Mean Sea Level
MD Reference:
1B-18 @ 102,00usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/ -S
+E/ -W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100ft)
(°/100ft)
(°/100ft)
(°) Target
7,930.48
91.53
68.60
6,610.05
-2,626.62
63.63
0.00
0.00
0.00
0.00
7,950.00
91.49
67.36
6,609.53
-2,619.30
81.72
6.35
-0.20
-6.35
-91.83
8,050.00
79.49
67.36
6,617.38
-2,581.00
173.56
12.00
-12.00
0.00
180.00
8,150.00
90.78
63.28
6,625.85
-2,539.44
263.92
12.00
11.29
-4.08
340.00
8,270.00
90.76
48.88
6,624.23
-2,472.66
363.23
12.00
-0.02
-12.00
270.00
8,470.00
90.69
72.88
6,621.65
-2,376.06
536.66
12.00
-0.03
12.00
90.00
8,590.00
90.67
58.48
6,620.22
-2,326.78
645.72
12.00
-0.02
-12.00
270.00
8,660.00
92.12
66.76
6,618.51
-2,294.62
707.80
12.00
2.07
11.82
80.00
8,750.00
86.71
57.40
6,619.43
-2,252.55
787.21
12.00
-6.00
-10.39
240.00
8,820.00
86.75
48.99
6,623.43
-2,210.72
843.11
12.00
0.05
-12.02
270.00
8,890.00
90.45
56.54
6,625.14
-2,168.42
898.78
12.00
5.29
10.78
64.00
9,010.00
77.21
62.25
6,638.02
-2,107.77
1,001.15
12.00
-11.03
4.77
157.00
9,210.00
95.83
77.49
6,650.16
-2,039.83
1,187.31
12.00
9.31
7.62
40.00
9,460.00
95.05
107.62
6,625.89
-2,050.83
1,433.02
12.00
-0.31
12.05
90.00
9,660.00
95.12
83.52
6,607.90
-2,070.03
1,629.81
12.00
0.04
-12.05
271.25
9,960.00
91.21
119.37
6,590.76
-2,128.68
1,918.51
12.00
-1.30
11.95
95.00
10,270.00
86.14
82.50
6,598.16
-2,186.56
2,217.45
12.00
-1.64
-11.90
262.00
10,570.00
92.72
117.92
6,601.23
-2,238.90
2,507.84
12.00
2.19
11.81
80.00
10,900.00
92.09
78.28
6,586.79
-2,284.40
2,827.77
12.00
-0.19
-12.01
270.00
11,300.00
91.40
126.30
6,573.82
-2,367.08
3,207.05
12.00
-0.17
12.00
90.00
11/17/2016 5:10:44PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips
ConocoPhillips (Alaska) Inc.
-Kup1
Kuparuk River Unit
Kuparuk 1B Pad
1B-18
1 B-18AL3-01
1 B-18AL3-01_wp01
Travelling Cylinder Report
17 November, 2016
MAPA 0i, k I
BAKER
HUGHES
.� Baker Hughes INTEQ r&A..
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kupl
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 1 B Pad
Site Error:
0.00 usft
Reference Well:
1 B-18
Well Error:
0.00 usft
Reference Wellbore
18-1 8AL3-01
Reference Design:
1 B-18AL3-01_wp01
Local Co-ordinate Reference:
Well 1 B-18
TVD Reference:
1 B-18 @ 102.00usft
MD Reference:
1 B-18 @ 102.00usft
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Output errors are at
1.00 sigma
Database:
OAKEDMP2
Offset TVD Reference:
Offset Datum
Reference
1 B-18AL3-01_wp01
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
nterpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
7,930.48 to 11,300.00usft Scan Method: Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,325.92 usft Error Surface: Elliptical Conic
Survey Tool Program
Date 11/17/2016
Casing Hole
Depth
From
To
(usft)
(usft) Name
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
469.67
6,897.50 1 B-18 (1B-18)
MWD
MWD - Standard
7,392.00
7,930.48 1B-18AL3PB1 (1B-18AL3PB1)
MWD
MWD - Standard
7,930.48
11,300.00 1B-18AL3-01_wp01 (113-18A13-01)
MWD
MWD - Standard
Casing Points
Measured
Vertical
Casing Hole
Depth
Depth
Diameter Diameter
(usft)
(usft) Name
Site Name
4,256.00
4,147.97 7.625"
7-5/8 8-1/2
11,300.00
6,675.82 2 3/8"
2-3/8 3
Summary
No -Go Allowable
Distance Deviation Warning
(usft) from Plan
(usft)
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
11117/2016 4:17:49PM Page 2 COMPASS 5000.1 Build 74
Reference
Offset
Centre to
Measured
Measured
Centre
Site Name
Depth
Depth
Distance
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
Kuparuk 1B Pad
1 B-04 - 1 B-04 - 18-04
1 B-05 - 1 B-05 - 1 B-05
1 B-06 - 1 B-06 - 1 B-06
1 B-07 - 1 B-07 - 1 B-07
1 B-08 - 1 B-08 - 1 B-08
1 B-08 - 1 B -08A - 1 B -08A
1 B-08 - 1 B-08ALl - 1 B-08AL1
1 B-08 - 1 B-08AL1-01 - 1 B-08AL1-01
1 B-08 - 1 B-08ALl-01 - 1 B-08AL1-01 wp07
1 B-08 - 1 B -OSA L 1 PB 1- 1 B -08A L 1 PB1
1 B-101 - 1 B-101 - 1 B-101
1 B-101 - 1 B-101 _1 - 1 B-101 _1
1 B-101 - 1 B-101 PB1 - 1 B-101 PB1
1 B-102 - 1 B-102 - 1 B-102
1B -12 -1B -12-1B-12
1 B-12 - Plan: 1 B-1 2A - 1 B-1 2A (wp01)
1 B-13 - 1 B-13 - 1 B-13
1 B-13 - 1 B -1 3L1 - 1 B-1 3L1
1 B-13 - 1 B-1312 - 1 B-131_2
1 B-14 - 1 B-14 - 1 B-14
1B -15 -1B -15-1B-15
1 B-15 - 1 B-1 5A - 1 B-1 5A
18-15 - 1B-15AL1 - 1B-15AL1
1 B-15 - 1 B-15AL2 - 1 B-15AL2
1 B-15 - 1 B-15AL2PB1 - 1 B-15AL2PB1
1 B-15 - 1 B-15AL2PB2 - 1 B-15AL2PB2
No -Go Allowable
Distance Deviation Warning
(usft) from Plan
(usft)
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
11117/2016 4:17:49PM Page 2 COMPASS 5000.1 Build 74
Baker Hughes INTEQ FEE..
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup1
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 1 B Pad
Site Error:
0.00 usft
Reference Well:
1B-18
Well Error:
0.00 usft
Reference Wellbore
1B-18AL3-01
Reference Design:
113- 1 8AL3-0 1 _wp0 1
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1B-18
1 B-18 @ 102.00usft
1 B-18 @ 102.00usft
True
Minimum Curvature
1.00 sigma
OAKEDMP2
Offset Datum
Summary
Kuparuk 1 B Pad 113-17-113-17-1B-17
Reference
Offset
Centre to
No -Go
Allowable
-
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
Kuparuk 1 B Pad
1 B-15 - 1 B-15AL3 - 1 B-15AL3
Measured
Vertical
Measured
Vertical
Out of range
1 B-15 - 1 B-15AL3PB1 - 1 B-15AL3PB1
Tooiface+
Offset Wellbore
Centre
Casing-
Centre to
Out of range
1 B-16 - 1 B-16 - 1 B-16
Depth
Depth
Depth
Depth
Out of range
1 B-17 - 1 B-17 - 1 B-17
9,220.07
7,400.00
307.91
10.78
307.49
Pass - Minor 1/10
1 B-17 - 1 B -1 7L1 - 1 B-171_1
9,309.65
7,275.00
360.96
5.83
360.73
Pass - Minor 1/10
1 B-17 - 1 B-171_2 - 1 B-171-2
9,325.00
7,250.00
394.91
5.67
394.68
Pass - Minor 1/10
1 B-17 - 1 B-171-2-01 - 1 B-171-2-01
9,325.00
7,250.00
394.91
5.67
394.68
Pass - Minor 1/10
1 B-17 - 1 B-171-2-01 PB1 - 1 B-171-2-01 P131
9,325.00
7,250.00
394.91
5.67
394.68
Pass - Minor 1/10
1 B-18 - 1 B-18 - 1 B-18
7,950.00
6,650.00
997.25
42.46
964.38
Pass - Major Risk
1 B-18 - 1 B -18A - 1 B-1 8A
8,232.57
8,325.00
20.53
0.29
20.30
Pass - Minor 1/10
18-18 - 1 B-18AL1 - 1 B-18ALl
7,950.00
7,950.00
0.00
1.40
-0.96
FAIL - Minor 1/10
1 B-18 - 1 B-18AL1 - 1 B-18AL1_wp05
7,950.00
7,950.00
0.00
1.40
-0.96
FAIL - Minor 1/10
1 B-18 - 1 B-18AL2 - 1 B-18AL2_wp02
7,950.00
6,650.00
997.25
130.42
892.26
Pass - Major Risk
1 B-18 - 1 B-18AL3 - 1 B-18AL3_wp05
7,949.85
7,950.00
2.97
1.31
2.75
Pass - Minor 1/10
1 B-18 - 1B-18AL3PB1 - 1B-18AL3PB1
7,950.00
7,950.00
0.00
1.40
-0.96
FAIL- Minor 1/10
1 B-19 - 1 B-19 - 1 B-19
9,100.03
6,753.50
6,275.00
5,896.02
30.85
Out of range
1 B-19 - 1 B-191-1 - 1 B-191-1
.1,275.47
851.00
5
1,192.50
10.23
Out of range
1 B-19 - 1 B -1 9L1-01 - 1 B -1 9L1-01
6,754.01
6,300.00
5,916.88
30.85
28.61
Out of range
1 B-19 - 1 B-191-1-02 - 1 B-191_1-02
858.87
5
1,168.43
10.26
1,168.01 Pass- Minor 1/10
Out of range
WSW -01 - WSW -01 - WSW -01
6,325.00
5,937.75
30.86
28.74
25.85
Out of range
WSW -02 - WSW -02 - WSW -02
5
1,144.38
10.28
1,143.96 Pass - Minor 1/10
9,120.20
Out of range
WSW -03 - WSW -03 - WSW -03
5,958.67
30.86
28.87
26.06
-1,309.31
Out of range
WSW -04 - WSW -04 - WSW -04
1,120.35
10.30
1,119.94 Pass - Minor 1/10
9,126.37
6,754.98
Out of range
WSW -05 - WSW -05 - WSW -05
30.86
29.01
26.23
-1,320.53
882.42
Out of range
Offset Design
Kuparuk 1 B Pad 113-17-113-17-1B-17
-
Offset Site Error: 0.00 usft
Survey Program:
60 -GCT -MS, 7427 -CB -GYRO -SS
Rule Assigned: Minor
1/10
Offset Well Error: 0.00 usft
Reference
offset
Semi Major Axis
Measured
Vertical
Measured
Vertical
Reference
Offset
Tooiface+
Offset Wellbore
Centre
Casing-
Centre to
No Go
Allowable Warning
Depth
Depth
Depth
Depth
Azimuth
+N/hS
+E/ -W
Hole Size
Centre
Distance
Deviation
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(")
(usft)
(usft)
(")
(usft)
(usft)
(usft)
9,060.25
6,749.15
6,150.00
5,792.09
30.86
27.82
23.58
-1,218.14
811.79
5
1,313.13
10.11
1,312.72 Pass - Minor 1/10
9,068.87
6,750.31
6,175.00
5,812.85
30.85
27.95
23.99
-1,229.68
819.59
5
1,288.98
10.13
1,288.57 Pass - Minor 1/10
9,077.16
6,751.31
6,200.00
5,833.60
30.85
28.08
24.37
-1,241.20
827.44
5
1,264.84
10.16
1,264.42 Pass - Minor 1/10
9,085.09
6,752.17
6,225.00
5,854.39
30.85
28.21
24.73
-1,252.67
835.28
5
1,240.71
10.19
1,240.29 Pass- Minor 1/10
9,092.68
6,752.89
6,250.00
5,875.19
30.85
28.34
25.05
-1,264.12
843.12
5
1,216.59
10.21
1,216.17 Pass - Minor 1/10
9,100.03
6,753.50
6,275.00
5,896.02
30.85
28.48
25.35
.1,275.47
851.00
5
1,192.50
10.23
1,192.08 Pass - Minor 1/10
9,107.06
6,754.01
6,300.00
5,916.88
30.85
28.61
25.62
-1,286.79
858.87
5
1,168.43
10.26
1,168.01 Pass- Minor 1/10
9,113.80
6,754.42
6,325.00
5,937.75
30.86
28.74
25.85
-1,298.07
866.75
5
1,144.38
10.28
1,143.96 Pass - Minor 1/10
9,120.20
6,754.73
6,350.00
5,958.67
30.86
28.87
26.06
-1,309.31
874.57
5
1,120.35
10.30
1,119.94 Pass - Minor 1/10
9,126.37
6,754.98
6,375.00
5,979.58
30.86
29.01
26.23
-1,320.53
882.42
5
1,096.35
10.33
1,095.93 Pass - Minor 1/10
9,132.32
6,755.15
6,400.00
6,000.44
30.87
29.14
26.38
-1,331.81
890.34
5
1,072.35
10.36
1,071.94 Pass - Minor 1/10
9,138.04
6,755.27
6,425.00
6,021.15
30.87
29.27
26.52
-1,343.30
898.35
5
1,048.32
10.38
1,047.91 Pass - Minor 1/10
9,143.57
6,755.33
6,450.00
6,041.71
30.88
29.41
26.64
-1,354.98
906.44
5
1,024.26
10.41
1,023.84 Pass - Minor 1110
9,148.90
6,755.34
6,475.00
6,062.20
30.88
29.54
26.75
-1,366.76
914.59
5
1,000.20
10.43
999.78 Pass- Minor 1/10
9,154.07
6,755.31
6,500.00
6,082.68
30.89
29.68
26.83
-1,378.55
922.76
5
976.16
10.46
975.74 Pass - Minor 1/10
9,159.08
6,755.23
6,525.00
6,103.17
30.90
29.81
26.88
-1,390.30
930.95
5
952.16
10.48
951.74 Pass - Minor 1/10
9,163.93
6,755.12
6,550.00
6,123.67
30.90
29.95
26.90
-1,402.02
939.15
5
928.20
10.50
927.78 Pass - Minor 1/10
9,168.62
6,754.98
6,575.00
6,144.18
30.91
30.08
26.88
-1,413.72
947.37
5
904.28
10.52
903.86 Pass - Minor 1/10
CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
11/17/2016 4:17:49PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips
Project: Kuparuk River Unit
Axl muthstoTrue Narlh
Magnetic North: 18.01°
WELLBORE DETAILS: 1B-18AL3-01
REFERENCE INFORMATION
Site: Kuparuk lB Pad
113-18
+NAS +E/ -W
Well: IB -18
Easting
Magnetic Field
Parent Wellbore: 1B-18AL3PB1
Co-ordinate, NIE)Reference: Well 1B-18, True North
Wellbore:1B-18AL3-01
5969647.06
Strength: 57550 7.,,T
Dip Arigle:99.98'
Tie on MD: 7930.48
Vertical TVD) Reference: Mean See Level
SectionlVS)Reference:Slot-(O.00N,O.00E)
Plan: 16.18AL3.01 w 01 113.18/16-18AL3-01
p (
35' 35.868 W
del:Da BGGM2016
Model: BGGM2016
MD
Measured Depth Reference: 1B-18 102.00us}I
Azi
TVDSS
+N/ -S
+E/ -W
Calculation Method: Minimum Curvature
600
610
> 620
� 630
O
O
640
¢ 650
d)
Q
660
U
670
tU 680
690
700
Mean SW
251
-25(
-50(
-75(
loo(
,lzs(
0
N-150(
X175(
-200(
x-225(
-250(
-2750
-3000
-3250
�/.Pit- I
BAKER
HUGHES
WELL DETAILS:
113-18
+NAS +E/ -W
Northing
Easting
Latitude
Longitude
0.00 0.00
5969647.06
550148.90
70°
19' 40.248
N 149°
35' 35.868 W
Sec
MD
Inc
Azi
TVDSS
+N/ -S
+E/ -W
Dleg
TFace
VSect
Annotation
1
7930.48
91.53
68.60
6610.05
-2626.62
63.63
0.00
0.00
1730.03
TIP
2
7950.00
91.49
67.36
6609.53
-2619.30
81.72
6.35
-91.83
1739.24
KOP
3
8050.00
79.49
67.36
6617.38
-2581.00
173.56
12.00
180.00
1785.29
Start 12 dls
4
8150.00
90.78
63.28
6625.85
-2539.44
263.92
12.00
340.00
1828.12
4
5
8270.00
90.76
48.88
6624.23
-2472.66
363.23
12.00
270.00
1861.68
5
6
8470.00
90.69
72.88
6621.65
-2376.06
536.66
12.00
90.00
1933.11
6
7
8590.00
90.67
58.48
6620.22
-2326.78
645.72
12.00
270.00
1985.36
7
8
8660.00
92.12
66.76
6618.51
-2294.62
707.80
12.00
80.00
2012.48
8
9
8750.00
86.71
57.40
6619.43
-2252.55
787.21
12.00
240.00
2046.56
9
10
8820.00
86.75
48.99
6623.43
-2210.72
843.11
12.00
270.00
2062.75
10
11
8890.00
90.45
56.54
6625.14
-2168.42
898.78
12.00
64.00
2078.44
11
12
9010.00
77.21
62.25
6638.02
-2107.77
1001.15
12.00
157.00
2118.29
12
13
9210.00
95.83
77.49
6650.16
-2039.83
1187.31
12.00
40.00
2217.83
13
14
9460.00
95.05
107.62
6625.89
-2050.83
1433.02
12.00
90.00
2413.67
14
15
9660.00
95.12
83.52
6607.90
-2070.03
1629.81
12.00
271.25
2577.16
15
16
9960.00
91.21
119.37
6590.76
-2128.68
1918.51
12.00
95.00
2836.51
16
17
10270.00
86.14
82.50
6598.16
-2186.56
2217.45
12.00
262.00
3103.24
17
18
10570.00
92.72
117.92
6601.23
-2238.90
2507.84
12.00
80.00
3359.87
18
19
10900.00
92.09
78.28
6586.79
-2284.40
2827.77
12.00
270.00
3634.80
19
20
11300.00
91.40
126.30
6573.82
-2367.08
3207.05
12.00
90.00
3979.14
Planned TD at 11300.00
600
610
> 620
� 630
O
O
640
¢ 650
d)
Q
660
U
670
tU 680
690
700
Mean SW
251
-25(
-50(
-75(
loo(
,lzs(
0
N-150(
X175(
-200(
x-225(
-250(
-2750
-3000
-3250
�/.Pit- I
BAKER
HUGHES
---- ---- ---- ---- ---- ---- - - - -
- - - -
- - - -
- - - -
- - - -
wtuV YLVV 4JUV -V 4�VU 4(1()U 4/00
Vertical Section at 129.79° (100 usft/in)
i0
West( -)/East(+) (250 usft/in)
1 -18A Faul
1 -18/1 1.18A
3
13-17/1 -l7L 0•JP.B
B-17/
B-17 1B- 7/IB', 7L2
IB -18/ B-18
F
I -1811 -1 LI 113- 7t1 B- 171,
111-
18/1 -18A
- 1 18AL -O] T)1
1 `I 1 -18113-18
Ll
o
9 16
IB 1911B LRAT 3PE11
4-
000
B-17/ B -17L -0 PE 1
A
Start 12 dls
Ti
OP
113
18/113 ] 8
Plan ed TD at 113
10.00
]B-1 Fau
t]
-
113-18 L1 F ultl
---- ---- ---- ---- ---- ---- - - - -
- - - -
- - - -
- - - -
- - - -
wtuV YLVV 4JUV -V 4�VU 4(1()U 4/00
Vertical Section at 129.79° (100 usft/in)
i0
West( -)/East(+) (250 usft/in)
)
1 -17/1 -17L2
F
o
B-17/ B -17L -0 PE 1
A
1 -17/1 1- -- 1
-
p)
IB -18/ B-18 L2
16-1 'lB-1 J
113-19/111-1 ALl
] -18/IE -18AL1-
IB -19 /113-1A 1 18/IB 18AL
TIP
i •'i,,, .•., ..,,, _ ,., '.,.,..-
P
antietl at 1300.0
O j
q 5 6 8 91 1 12 �'- 14
•1
13'",
B-18/ B-18 L3-01
to
s IB -16/1B -18:1L3 Bl
I
IB-
8/18- 8I
17/IB 17
i
113 18
_Faul2 113-1 A 1 aultl
900
1000 1100 1200
1300
1400
1500 1600 1700 1Rnn
14n0 7nnn Zinn o?nn oznn 'nnn 1- 1< 1 I'll
---- ---- ---- ---- ---- ---- - - - -
- - - -
- - - -
- - - -
- - - -
wtuV YLVV 4JUV -V 4�VU 4(1()U 4/00
Vertical Section at 129.79° (100 usft/in)
i0
Schwartz, Guy L (DOA)
From:
Sent:
To:
Cc:
Subject:
Attachments:
Guy and Victoria,
Connelly, Jeff <Jeff.S.Connelly@conocophill ips.com>
Friday, November 18, 2016 8:32 AM
Schwartz, Guy L (DOA); Loepp, Victoria T (DOA)
Starck, Kai; Eller, J Gary; Ohlinger, James J; Burke, Jason; Phillips, Ron L; Callahan, Mike S;
Herring, Keith E; Long, William R; Connelly, Jeff, Nabors CDR2 Company Man; Starns,
Ted C; Little, Laird D.; Neely, Thomas G; Gieryic, Steve M
Authorization to Continue Drilling, KRU 1B-18AL3-01 (new lateral)
1B-18AL3-01_wp01 VPO - NAD27.pdf, 1B-18 Spider ZoomOut .pdf, 1B-18AL3-01
10-401.pdf, 1B-18AL3-01_wp01 SPR - NAD27.pdf, 1B-18AL3-01_wp01 TCR - NAD27.pdf
Request for Authorization to Continue Drilling, KRU 1 B-18AL3-01 (new lateral)
Due to difficult faulting encountered in the drilling of the KRU 1 B-18AL1 lateral (PTD 216-109) a new lateral
(KRU 1 B-18AL3-01) will be required in order to achieve the original goals of the project. AOGCC approval is
required as this is a request for an additional lateral. The KRU 1 B-18AL3-01 lateral will target the same A4 fault
blocks to the east originally targeted by the 1 B-18AL1 lateral (PTD 216-109).
A 10-401 application for PTD and well -plan are attached for your review. Additionally, a hard copy of this
documentation is prepared and should arrive at your offices shortly.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC
25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being
limited to 500' from the original point for all laterals of this project including 1 B-1 8A, 1 B-18AL1, 1 B-18AL2, 1 B-
18AL3, & 1 B-18AL3-01.
If you have any questions or require additional information, please contact me at 907-263-4112.
Regards,
Jeff Connelly
Associate CTD Engineer
907-263-4112 (Office) 1907-328-8854 (Mobile)
700 G Street, ATO 662
Jeff.S.Connelly@conocophillips.com
'fv"
onoc Phillips
XaSka
TRANSMITTAL LETTER CHECKLIST
WELL NAME:
PTD:
Development Service Exploratory Strati ra hic Test Non -Conventional
— p — — p �' — g p —
FIELD: l� (l�l� t V POOL: of
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. _10 API No. 50-�W.'q - 2R -Q-_g6 .
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -) from records, data and logs acquired for well
(name onpermit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100
Well Name: KUPARUK RIV UNIT 1B-18AL3-01 Program DEV_ Well bore seg
PTD#: 2161560 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type
DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑
Administration
17
-Nonconven. gas conforms to AS31.05.030Q.1.A),(j.2.A-D) - - - - - - - - - - - - -
_NA_
1
Permit fee attached_ --
NA
2
Leasenumberappropriate_ - - - - - . ---------
Yes _
- - ADL0025648, entire wellbore_ --- ---------
3
-Unique well - - - - - - - - - - - - - - - - -
Yes_
- KRU 1 B-18AL3-01 _
4
Well located in-a_defined-pool- - - - - -------
Yes -
- - KUPARUK RIVER,.KUP_ARUK_RIV OIL--4901.00,_governed_by Conservation_Order_N_o. 432D._
5
Well -located proper distance from drilling unit- boundary- - -
Yes -
- - - - - - CO 432D contains no spacing restrictions with respect to drilling unit boundaries. - - - - - - - - - -
6
Well located proper distance from other wells- _ - - - - - -
Yes
CO 432D has no interwell_spacing-restriction_s._
7
Sufficient acreage. avail_able in-dril_ling unit_ - _ - ---
Yes .
- - - -----------
8
-if-deviated, is -wellbore plat included - - - -
Yes .
.
9
Operator only affected party - - - - - - - - - - - - - - - -
Yes-
Wellbore -will be more than 500' from an external property line where_ ownership or landownership changes.
10
Operator hasappropriatebond in force - - - - - - - - - -
Yes
Appr Date
11
Permit -can be issued without conservation order- - - -
Yes
- - - - - - - - - - - - - - - - - - - - - - -- - - - - -
12
-P - ermitcan be issued without ad ministrative_approval
-
Yes
PKB 11/18/2016
- - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - - -
13
Cn permit be approved before 15 -day wait_ - -
Yes -
- -
14
Well located within area and -strata authorized by Injection Order # (put_ 10# in comments) (For_
NA- -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15
All wells -within -1/4_mile_area_of review identified (For service well only)_ - - - -
NA
16
Pre -produced injector, duration -of pre production less than 3 months_ (For -service well only)
NA- -
- - - - - - - - - - - - - -
18
Conductor string -provided - - - - - - - - -
N_A- -
- - Con-ductor set-in 113-118A
Engineering
19
Surface casing_ protects all known USDWs - - -
- ---- ----
NA
- - _ _ - - - -
Surface casing set in -1_B_ -18A_ - -- - - -- - -- -- --
20
CMT vol adequate -to circulate- on conductor & surf_csg - - - _ - - - - - - - ..
NA_
- - - - - - - _
21
CMT vol adequate to tie -in -long string to surf csg------------ - - -
_NA_
Production casing set - - - - - - - - - - - - -
22
CMT -will coverall known _productive horizons_ - - -
Yes -
- - - - - 2 3/8" slotted liner will be placed in lateral. No cement or -swell packers._ - - - - -
23
-Casing designs adequate for CJ, B &_ permafrost _ - - - - - - -
Yes -
- - - - - - - - - - - - - - - - - - - - -
24
Adequate_tankage-or reserve pit _ ---- -----
Yes
Rig has steel pits, All waste to_approved disposal_wells.---------
25
_If_a_re-drill_, has. a 1.0-403 for abandonment been approved - - _ _ _
Yes -
_ _ - _ - _ Sundry_316-416 to _P & A_1B-18_(PTD 194-0.61)_ - - - - -
26
Adequate wellbore separation_ proposed- - - - - - - - - . -
Yes -
- - _ _ - - Anti_col_lission data supplied. -No issues PP -
27
If_diverter required, does it meet_ regulations_ - - - - _ -
NA- -
_ - - _ - - Well head in_ place._ BOPE will be placed tree.
P -- -
Appr Date
28
Drilling fluid_ program schematic -& equip list _adequate _ - - - - _ -----------------
Yes
Max formation_ press= 3005psi ( 9.0 PPG_EMW)_Will drill 8.6_ ppg mud and maintain BHP with _M_PD.
GLS 11/18/2016
29
BOPEs,-dotheymeetregu_lation - - - - - - - - - -- - - - - - - - - - - - - -
Yes-
- - - - - - - - - - - - -- - - -- - - - - - - - - - - - - - - - - - . - - - - - - - - - - - - - - - - - - - - - -
30
BOPE_press rating appropriate; test to -(put prig in comments)_ - _ - - - - - - - -
Yes -
- - - - - - MASP = 2437_psi-(will test ROPE 3500 psi )- - - - - - - - - - - - - - -
31
Chokemanifoldcomplies w/API_RP-53 (May 84)_ - - - _ - - - - -
Yes -
- - - - _ _
32
Work will occur without operation shutdown_ - - - _ - - _ _ - - - - - - - - - - - - - -
Yes
33
Is presence- of H2S gas_ probable _ _ - - - - - - - .-
Yes -
- - - - - - H2S in area. _ Righas sensors and_ alarms.-
-
34
Mechanical_ condition of wells within AOR verified (For_service well on -
NA- -
-------------
35
Permit -can be issued w/o hydrogen_ sulfide measures - - - - - _ - -
No
Wellsonare_H2S-bearing. H2S measures required - _ - - -
Geology
36
Data- presented on potential overpressure zones _ - - - - - _ - - - _ _ _ _
Yes _
_ _ _ _ - - Expected r_eservoirpressu_re is 9.0_ppg EMW; will -be drilled using 8.6 ppg mud_ and MPD technique.
Appr Date
37
Seismic analysis_ of shallow gas -zones- - - - _ - - -
N_A_ -
- - - - - . - - - - - - - - - - - - -
PKB 11/18/2016
38
Seabed condition survey -(if off_ -shore) - - - - - - - - - - - - -
NA. _
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - _ _ - - - - - - - - - - - - - - - - - -
39
Contact name/phone for weekly_ progress reports- [exploratory only] _
to
NA_
Onshore development lateral be drilled. - - - -
Geologic Engineering Public
Commissioner: Date: Commissioner: Date C i . Date