Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-045
DATA SUBMITTAL COMPLIANCE REPORT 7/27/2017 Permit to Drill 2170450 Well Name/No. KUPARUK RIV UNIT 2Z -29L1 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-21881-60-00 MD 13162 TVD 5967 Completion Date 4/25/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log No / / V/ Samples Not/ Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OHI Type Med1Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 28169 Digital Data 5/4/2017 Electronic File: 2Z-291_1 EOW - NAD27.pdf ED C 28169 Digital Data 5/4/2017 Electronic File: 2Z-291_1 EOW - NAD27.txt' Log C 28169 Log Header Scans 0 0 2170450 KUPARUK RIV UNIT 2Z-291_1 LOG HEADERS ED C 28170 Digital Data 5/4/2017 Electronic File: 2Z-291_1 PB1 EOW - NAD27.pdf- ED C 28170 Digital Data 5/4/2017 Electronic File: 2Z-291_1 P61 EOW - NAD27.txt' Log C 28170 Log Header Scans 0 0 2170450 KUPARUK RIV UNIT 2Z-291_1 PB1 LOG HEADERS ED C 28227 Digital Data 9657 13162 5/23/2017 Electronic Data Set, Filename: 2Z-290 0• RES.Ias Log C 28227 Log Header Scans 0 0 2170450 KUPARUK RIV UNIT 2Z-291_1 LOG HEADERS ED C 28227 Digital Data 5/23/2017 Electronic File: 2Z -29L1 2MD Final Log.cgm ED C 28227 Digital Data 5/23/2017 Electronic File: 2Z -29L1 5MD Final Log.cgm ED C 28227 Digital Data 5/23/2017 Electronic File: 2Z-291_1 5TVDSS Final Log.cgm ED C 28227 Digital Data - Q 5/23/2017 Electronic File: 2Z-291_1 21VID Final Log.pdf - ED C 28227 Digital Data P 5/23/2017 Electronic File: 2Z-291_1 51VID Final Log.pdf ED C 28227 Digital Data %05/23/2017 Electronic File: 2Z-291_1 5TVDSS Final Log.pdf - ED C 28227 Digital Data 5/23/2017 Electronic File: 2Z -29L1 EOW - NAD27.pd( IED C 28227 Digital Data 5/23/2017 Electronic File: 2Z-291_1 EOW - NAD27.txt ' ED C 28227 Digital Data 5/23/2017 Electronic File: 2Z-291_1 final surveys (13162).csv ED C 28227 Digital Data 5/23/2017 Electronic File: 2Z-291_1 final surveys (13162).xls ' AOGCC Page I of 3 Thursday, July 27, 2017 DATA SUBMITTAL COMPLIANCE REPORT 7/27/2017 Permit to Drill 2170450 Well Name/No. KUPARUK RIV UNIT 2Z-291-1 MD 13162 28227 Digital Data IED C 28227 Digital Data ED C 28227 Digital Data ED C 28227 Digital Data ED C 28227 Digital Data TVD 5967 Completion Date 4/25/2017 28227 Digital Data 28227 Digital Data ED C 28227 Digital Data ED C 28227 Digital Data ED C 28227 Digital Data ED C 28227 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data ED C 28228 Digital Data Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029-21881-60-00 Completion Status 1-0I1- Current Status 1 -OIL UIC No 5/23/2017 Electronic File: 2Z-291-1 Survey Listing.txt , 5/23/2017 Electronic File: 2Z-291-1 Surveys.txt- 5/23/2017 Electronic File: 2Z- 291-1_25_tapescan_131-1I_CTK.txt . 5/23/2017 Electronic File: 2Z- 291-1_5_tapescan_BHI_CTK.txt - 5/23/2017 Electronic File: 2Z-291-1_output.tap 5/23/2017 Electronic File: 2Z-2911 21VID Final Log.tif 5/23/2017 Electronic File: 2Z-291-1 51VID Final Log.tif 5/23/2017 Electronic File: 2Z-291-1 5TVDSS Final Log.tif' 5/23/2017 Electronic File: 2Z-291-1 PB1 21VID Final Log.cgm- 5/23/2017 Electronic File: 2Z-291-1 PB1 51VID Final Log.cgm - 5/23/2017 Electronic File: 2Z-291-1 PB1 5TVDSS Final Log.cgm P 5/23/2017 Electronic File: 2Z-291-1 PB1 21vID Final Log.pdf P 5/23/2017 Electronic File: 2Z-29L1PB1 SMD Final Log.pdf p 5/23/2017 Electronic File: 2Z-291-1 P131 5TVDSS Final Log.pdf 5/23/2017 Electronic File: 2Z-29L1PI31 EOW - NAD27.pdf 5/23/2017 Electronic File: 2Z-29LiPB1 EOW - NAD27.txt 5/23/2017 Electronic File: 2Z-29L1PB1 final surveys.csv 5/23/2017 Electronic File: 2Z-29L1PB1 final surveys.xls 5/23/2017 Electronic File: 2Z-291-11381 Survey Listing.txt 5/23/2017 Electronic File:2Z-29L1PB1 Surveys.txt_ 5/23/2017 Electronic File: 2Z- 291-1PB1_25_tapescan_BHI_CTK.txt - 5/23/2017 Electronic File: 2Z- _ 291-1 PB 1_5_tapescan_BHI_CTK.txt 5/23/2017 Electronic File:2Z-29L1PB1_output.tap 5/23/2017 Electronic File: 2Z-291-1 PBt 21VID Final Log..tif 5/23/2017 Electronic File: 2Z-29I1PB1 510D Final Log.tif AOGCC Page 2 of 3 Thursday, July 27, 2017 DATA SUBMITTAL COMPLIANCE REPORT 7/2712017 Permit to Drill 2170450 Well Name/No. KUPARUK RIV UNIT 2Z -29L1 MD 13162 TVD 5967 Completion Date 4/25/2017 ED C 28228 Digital Data Log C 28228 Log Header Scans ED C 28228 Digital Data Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report Y Production Test Informatior YoNA Geologic Markers/Tops D COMPLIANCE HISTORY Completion Date: 4/25/2017 Release Date: 4/7/2017 Description Comments: Interval Start Stop Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029.21881.60.00 Completion Status 1 -OIL Current Status 1 -OIL UIC No 5/23/2017 Electronic File: 2Z -29L1 PB1 5TVDSS Final Log.tif 0 0 2170450 KUPARUK RIV UNIT 2Z-291_1 PB1 LOG HEADERS 9657 12400 5/23/2017 Electronic Data Set, Filename: 2Z-29L1PB1 GAMMA RES.Ias Sample Set Sent Received Number Comments Directional / Inclination Data Mud Logs, Image Files, Digital Data Y /®A Core Chips YA Mechanical Integrity Test Information Y / l:/ Composite Logs, Image, Data Filesb Core Photographs Y /A Daily Operations Summary b Cuttings Samples Y NA Laboratory Analyses Y/ A Date Comments Compliance V., -,d: S\_v _~ Date: 1 /( I AC GC'C' Pagc 3 of 3 Thursday, July 27, 2017 WELL COMPLETION OR RECOMPLETION REPORT AND LOG ta.Well Status: OII❑� Gas❑ SPLUG❑ Other ❑ Abandoned ❑ Suspended❑ 20AAC 25.105 20AAc 25.110 GINJ❑ WINJ❑ WAGE] WDSPL❑ No. of Completions: 1b. Well Class: Development Exploratory ❑ Service ❑ Stratigraphic Test El 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 4/25/2017 14. Permit to Drill Number/ Sundry: 217-045 1 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 4A4A2= 4f 13 7l1 15. API Number: 50-029-21881-60 4a. Location of Well (Governmental Section): Surface: 4121' FNL, 257' FEL, Sec 11, T11 N, R9E, UM Top of Productive Interval: 3916' FNL, 27' FEL, Sec 13, T11 N, R9E, UM Total Depth: 1211' FNL, 214' FEL, Sec 13, T11 N. R9E, UM 8. Date TO Reached: 4/23/2017 16. Well Name and Number: 2Z-29L1/2Z-29L1PB1 9. Ref Elevations: KB:109 GL: 68 BF: 17. Field / Pool(s): Kuparuk River Pool/Kuparuk River Oil Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ADL 25653, ADL 25646 r 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 529453 y- 5965916 Zone- 4 TPI: x- 534986 y- 5960866 Zone- 4 Total Depth: x- 534786 y- 5963570 Zone- 4 11. Total Depth MD/TVD: 13162/5967 19. DNR Approval Number: ALK 2579 12. SSSV Depth MD/TVD: 1796/1701 . 20. Thickness of Permafrost MD/TVD: 1450/1300 5. Directional or Inclination Survey: Yes ❑� (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: 9889/5976 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res RECEIVED MAY 2 3 2017 23. CASING, LINER AND CEMENTING RECORD a CC WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM PULLED 16 62.5 H-40 41 115 41 115 24 182 sx AS III 9518 36 J-55 40 5184 40 3551 12114 1100 sx AS III, 500 sx Class 7 26 J-55 33 10383 33 6289 8112 485 sx Class G 23/8 4.6 L-80 9885 13162 5974 5967 3 Blank/Slotted Liner 24. Open to production or injection? Yes 0 No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): SLOTTED LINER @ 10338 - 13162 MD and 5944 -5967 COMPLETION DATEF __a 2I� VFPIFIFD lL 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 31/2 9940 1 9698/5861 1 9913/5991 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑Q Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 6/8/2017 Method of Operation (Flowing, gas lift, etc.): GAS LIFT Date of Test: 5/10/2017 Hours Tested: 9hrs Production for Test Period Oil -Bbl: 685 Gas -MCF: 747 Water -Bbl: 936 Choke Size: 176/176 Gas -Oil Ratio: 1 1093 Flow Tubing Press. 1gRnAM Casino Press: I 1220 si Calculated 24 -Hour Rate -6. Oil -Bbl: 912 Gas -MCF: 996 Water -Bbl: 1248 Oil Gravity -API (torr): NotSampled /fid -40?? Form 10-407 Revised 5/2017 viz- 5-131113- A 311/1 CONTINUED ON PAGE 2 R BDMS (_(- MAY 2 4 201iubmit ORIGINIAL o 28. CORE DATA Conventional Core(s): Yes ❑ No ❑� Sidewall Cores: Yes ❑ No ❑� If Yes, list formations and intervals cored (MD/TVD, Fromlro), and summarize lithology and presenceof oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS - NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1450 1410 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 10280 5951 information, including reports, per 20 AAC 25.071. Formation @TPI Kuparuk C TO 13162 5967 2Z -29L1 PB1 TD (Kuparuk C) 12399 5943 Formation at total depth: Ku aruk c 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematics Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysi oaleontoloo cal report, production or I 7. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: J. Ohlin er Contact Name: Keith Herrin Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herrinq(&oop.bom Authorized52' //7 Contact Phone: 263-4321 Signature: Date: 2i' INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10.407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item la: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071, Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only @ 115' 051" rand Pert. 9792' - 9850' MD KOP 9889MD A-santl parts 10002'- 10188' MD 'r 26# J-55 shoe 10383' MD 2Z-29 Final CTD Schematic 11n' Ceram TRDP-1A SS.V @ 1788' RKB (2.812' min ID) 3-12' 9.3a J-55 EUE 8rtt Tusng to surlace 3la7 Lamm gas lift mmttrels @ 3235', 5709', 8727, 7408', 802r, 8743', 9431', 9634'RKB 11n' AVA PBR @ 9684' RKB AVA RHSX Rebrevable Packer@9688'MD ltlr Cameo pmttuction mandrel @ 9725' MD Sin" O4s ported setting nipple @ 9888' MD •• Milktl to 2.80' with CORS TM SS -BB pemlanent packer@ 9908 MD SBE @ 9984' MD Olis XN Nipple el m go pmgle @ 9917' MD (2.635 rein ID) 1W' Mbing Nil @ 9927' MD 89L1pB1 N=12399'MD rMrett.IIIN• 11573' MD OF•118.5'MO - Lower Deamp motion of awlor an4 Mt 1318' MD KUP PROD 2Z-29 ConocoPhlllip5 Wall attdt Max Ant mD TO Alaska lIL W Ivre APYUWI Flefa xnma wellta,e stdue nm l•) MD o�n61 Act Btm lnnel 500292188100 KUPARUK RIVER UNIT PROD 6188 4.600.00 1645 illi]ilaR�liiiP.Ui�SSMfliZfnliFLIK arnai Anwtatlan Do ME) Eud Dab Ar.hmn lest Mca By Fno Date - - - -Last Tag SLM 10,068.0 11222016 Rev Reason: SIDETRACK ( SlotleWBlank Liner) ppmven 512212017 HPNGER; 31., as ng ngs at CritterOescrlpllon GD(m) TDp IN(BI Set Mpb lnKBf Set Depth (NDL-WVLan 9..,GMe lop TM1rWtl CONDUCTOR 161"'r), .062 410 115.0 1150 6250 H-00 WELDED Ca.m. Descrllatlon WOn ID lin) Top(ItNBI 9e1 DepIM1 (RNB) Set Delttx (ND)... WVlsn 11... WMe Top iMW SURFACE 9518 0.921 40.1 5,184.0 3,551.3 36.00 J-65 BTC Casino Descnp,bn ODllm ID(Inl Top IRK61 eel DepM more. Set DepN WIM1.en 11... GraN Top Thrua PRODUCTION ] 6216 33.0 10.3829 6.2889 26.00 J-55 BTC AMB 41 'CdaDOc4Dk: 4 DitsO Tubing Strings TubinB Das-iPumn SlrinB Ma... IDllnl Tap(AKel Sm Depthln.sel Depth IN011... Wtlldn) Gude Top Connection TUBING 312 2992 31.1 9.939> 6001.1 9.30 J-55 EUE81J s.FErrvLv:"Pain Completion Details xominal Io TDp IttNTopIND1Top InchHem Des Co. pn) 3 31.1 31.1 31.1 0.088 HANGER FMC GEN 4TUBING RANGER 3.500 GA9 LIFT', 3MA 1,796.0 1]00.8 37.02 SAFETY VU? CAMCO TRDP-1A SAFETY VALVE 2.812 9,684.4 5,853.6 55.04 PBR AVA PBR 3.900 91698.0 5,8614 54.74 PACKER AVA RHS -XL RETRIEVABLE PACKER 3.003 9,]]4.0 5,906.2 53.06 BLAST CARBIDE BEAST RINGS (3) 3.867 RINGS ..R.., Wd6.181 ` 9,876.3 5,968.4 52.48 NIPPLE OTIS PORTED LANDING NIPPLE 2.310 9,911.1 5,989.6 52.42 LOCATOR TIW LOCATOR 3.000 9,913.1 5,990.8 52.40 PACKER TIW SS -BB PERMANENT PACKER 4.030 Gas LIFT. a... 9,9168 5,983.1 52.38 SBE SEAL BORE EXTENSION 4.000 9,929.] 60310 5231 NIPPLE OUS XN NIPPLE M NO GO PROFILE 2.635 9939.1 J006.] 5225 SOS AVA SHEAR OUT SUB 2.992 00.9IJI. rsII 3 Other In Hole (line retrievable plugs, valves, pumps, fish, etc.) Wire roplrvDl Top ma TDp lnnel Innel 1.1 Dee Co. Run Dale JI 9,88].0 5,9]4.9 5248 3-112" 3-112" Manobole XL Whipstock 4112201] 1.000 GPS DFiI 7,4m7Monobore Whipstock GASUFT.0armf Perforations &Slots Snot Gas uFr: e,ra3f cons lry TopDl elm lrvDl phaco Tap 116{6) a. (ME) MKaI proon Zww Dm m Trpe Com GABUFT, e.w.e 9,]920 9,850.0 5,91)0 5,952.4 C-0, UNIT B. 2/1811989 12.0 WERE 120 deg, phase;F 2Z-29 Sequential Omni K 10,002.0 10,022.0 6,045.4 6,05]] AL, 2Z-29 125,1990 80 APERF 60 tleg. phasing; 2118" . uFr.1tiou a Dyne Strip 10,034.0 10,0510 6,065.1 6,075.7 A -0,2Z-29 102311992 40 RPERF 180deg. phssing;2118" Bi Wire Pen: 9.5,4.4 10,034D 10,080.0 6,065.1 6,093] A-0, 2Z-29 1211811989 8.0 APERF 60 deg. phasing; 2116' Sil. PACKER: a,..-AtldS 10,051.0 10,0850 6,0753 6096.9 A -4,2Z-29 1022/1992 6.0 RPERF 180de6.phasing;212' BI Wire PPCC.C'O'%"mS -. D 10,080.0 10,WD.D 6,093.7 6,100.0 A4, 2239211811989M 8.0 IPERF 120 deg. phase; 5' $equirmal Omni K 10,134.0 10,148.0 6,127.5 6,135.1 A-3. 2Z-29 211811989 8.0 IPERF 120 deg. phase; S Sequential Omni K PRAC: GT990 IPERF:9.]91.OB.e400� I 10,154.0 10,166.0 6,140.1 6,1476 A-3, 2Z-29 211811989 8.0 IPERF 120deg.phase;5- Sequential Omni K Stimulations & Treatments "'poll .-Vim Proppom In Formation num Dace xwPLE: s.ms.a I 21612061 Stimulations & Treatments -1 cban Pump uxER Li e,e86af3,,ms sl8a Top (tIK6) film Me) Dab stimnrem Plum 1666 volsbrly iNep 1 9792.0 98500 21612001 mcATOR; e,B,,., Mandrel Inserts m PPLKFR: 8.9131 SSE:9,elGe H Tap VvD1 VeNe lath POn Sbe TRO Run Top lHKel (HKB) New M04N 00 (in) Berm Typ Type (In) I (w) Run Ogle Cam 3,235.0 2,5480 CAMCO KBUG 1 GAS LIFT GLV BK 0.156 1.350.0 351 l 2 5,709.4 3,11MB CAMCO KBUG 1 GAS LIFT GLV BK 0,188 1,332.0 3192001 xIPP1FI0,,°m] 3 an7.3 4,3375 CAMCO KBUG 1 GAS LIFT OV BK 0.188 00 121202007 sos:9,�.1 4 ],40],7 4,6753 CAMCO KBUG 1 GAS LIFT DMV BK 0.000 0.0 11262001 5 8,027.1 4,9995 CAMCO KBUG 1 GAS LIFT DMV BK 0.000 0.0 Z2111989 6 8,743.1 5,371.4 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 1242001 ] 9,430.5 5,7160 CAMCO KBUG 1 GAS LIFT DMV BK 0-000 0.0 22111989 APERF: IOm9b10.0 O. B 9,633.6 6824.9 CAMCO MI 112 GAS LIFT DMY RK 0000 0.0 11182001 9 9,7352 5,883.1 CAMCO KBUG 1 PROD EOUA BK 0.000 00 42311994 Close DMY d RPFRR 100110-10.�10� APERF: 610,pp0` Not": General & Safety Safety 10 da RPERR IO,Ti1 0 -10,01K0 -I En00ate Annotation IPERF: fU,0HW 6t0.IA30� 12812001 NOTE: LEAK DETECTED IN FIRST JOINT ABOVE LOWER PACKER lasaUll NOTE: View SC0ema6c Wl Alas"bChCImmCv0 IPERRt13,13 0-InI450- IPERR10151.61131660- PRODUCTIM;WD-o3all 2Z -29L1 MmYlbn DeMN"i End— Annul— l+st MI ey ESWDab Last Tag' SLM Rev Reaun: SIDETRACK (SIo1ceNBlank liner pproven 9122017 RANGES me casing Strings cee119 Descriedi OD NntmNnt rop tnNEI 3a Droln SKID set Depth lrv0l... WIILen IL..Gme roPTmLaE LINER Li 2318 1992 9885.0 13,162.5 460 L-80 STL Liner Details rvominsl lD TOP (.6)rap TVD) (ME Top bale IRm Das CornNnl 9,885.0 5.9>3> 52 J8 Deployment SNarty Deployment Sleeve 1.920 I Sleeve Stimulations & Treatments CONOUGTOfl: 116115 f1 Peeppant Desii flit Proppant In Formatlon III Dh va,zo61 I Notes: General & Safety End Date AnnMetbn NOTE'. View SChemalic wl Alaska Scnemalic9.0 6AFElY VLV; I,]W.0 WSLIFl:3.'G6.0 SD0.FACE: tl.1 A,1G.0� G4S OR: 5 M4— ISIS OFT: 6.7273 GIS LIFT: 7.407.] 613 LIFT: RWA G45 LIFT: 9.7.I GIS LIFT. E.E Das uFr; e,xue IPERF, 9,7(2"94090 FRAO:8793.0� I NIPPLE,96783 PRODOS1014: M 0.10SO LINER LI; 9405.013163.5) Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SleftDeplh Start Time EM Time Dur(hp Phase Op Code AaWy Code Time P -T -X Operabon (Ws) End DeW(Wa) 4/9/2017 4/10/2017 24.00 MIRU MOVE WAIT T Wait on next location to be prepared 0.0 0.0 00:00 00:00 4/10/2017 4110/2017 8.00 MIRU MOVE MOB P Trucks on location - PJSM move rig 0.0 0.0 00:00 08:00 off 3M-14, Jeep up modules - Leave pad @ 2:00. Stand by at 1 Q for shift change, Arrive on pad 4/10/2017 4/10/2017 2.00 MIRU MOVE MOB P On Pad - remove Jeeps 0.0 0.0 08:00 10:00 4/10/2017 4/10/2017 5.00 MIRU MOVE MOB T Stand by for continued well prep. Pull 0.0 0.0 10:00 15:00 flow lines, install additional valves on tree 4/10/2017 4/10/2017 2.00 MIRU MOVE MOB P Location complete, Spot modules on 0.0 0.0 15:00 17:00 2Z-29, MIRU 4/10/2017 4/10/2017 5.00 MIRU MOVE RURD P Run Rig up check list, R/U putz 0.0 0.0 17:00 22:00 4/10/2017 4/10/2017 1.00 MIRU WHDBOP NUND P NU BOPE 0.0 0.0 22:00 23:00 Accept rig at 2200 hrs 4/10/2017 4/11/2017 1.00 MIRU WHOBOP BOPE P Begin full BOP test. Test witness 0.0 0.0 23:00 00:00 waived by Brian Bixby, AOGCC. 4/11/2017 4/11/2017 6.00 MIRU WHOBOP BOPE P Complete intial BOPE lest. 0.0 0.0 00:00 06:00 4/11/2017 4/11/2017 2.00 MIRU WHDBOP PRTS P Pressure test PDL's, TT lines. 0.0 0.0 06:00 08:00 4/11/2017 4/11/2017 1.00 MIRU WHDBOP MPSP P PJSM, prep floor, pull BPV, hook up 0.0 0.0 08:00 09:00 SSSV to manifold 4/11/2017 4/11/2017 1.00 SLOT WELLPR SVRG P Pressure seat MP#1 seats 0.0 0.0 09:00 10:00 4/11/2017 4/11/2017 3.00 SLOT WELLPR MILL P Bleed OA to below 1000 psi, PJSM, 0.0 52.0 10:00 13:00 PU & PD BHA #1 Nipple Milling Assemlby (D331 ridge set mill & 0 degree6 AKO motor), skid cart over well, stab on, open EDC, tag up. 4/11/2017 4/11/2017 3.20 SLOT WELLPR MILL P RIH pumping /bpm with an open 52.0 9,841.0 13:00 16:12 EDC, taking gas out to TT begining at -5100' MD, went on total losses at -8100' MD, tie into K1 for -6' correction. Shut down pumps at 9724', blow down TT lines. 4/11/2017 4/11/2017 2.00 SLOT WELLPR MILL P PUH slowly from 9841'to begin 9,841.0 9,841.0 16:12 18:12 sending 40 bbl, 100K LSRV pill down- hole in attempt to establish returns. 4/11/2017 4111/2017 0.20 SLOT WELLPR MILL P Open Choke trying to establish returns 9,841.0 9,867.0 18:12 18:24 to the tiger tank, 1 bpm in, 0.36 bpm out Close choke, blow down lines, RIH, S/D pumps, close EDC, dry tag nipple, 9867. 4/11/2017 4/11/2017 0.70 SLOT WELLPR MILL P PUH, 37k PU Wt, Itis set parameters, 9,867.0 9,872.0 18:24 19:08 1.46 bpm, diff 226 psi, Mill nipple, saw - 50 psi motor work at 6958', dropped off by 9870'. 4/11/2017 4/11/2017 0.50 SLOT WELLPR MILL P Drop pumps to min rate, PUWL 37 k 9,872.0 9,919.0 19:06 19:36 lbs, PUH to 9850, S/D pumps, dry drift nipple, clean. RIH, dry tag XN nipple @ 9919' 4/11/2017 4/11/2017 0.70 SLOT WELLPR MILL P PUH, 37 k lbs, Tie into the K1 for zero 9,670.0 9,915.0 19:36 20:18 correction, log CCI to XN nipple. Page 1/19 Report Printed: 5/3/2017 Operations Summary (with Timelog Depths) 2Z-29 %Og: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log siart0eptn Slab Time End Time Our (hr) Phage Op Code Activ4 Code Time P -T -X Operation (eKB) EM 0eptti (flKB) 4/11/2017 4/11/2017 0.70 SLOT WELLPR MILL P Open EDC, Pump 20 bbls 100k LSRV 9,915.0 9,915.0 20:18 21:00 pill, layed in from 9870'. Pull out of hole pumping pipe voidage against a dosed choke. 4/11/2017 4/11/2017 1.50 SLOT WELLPR MILL P POOH 9,915.0 43.0 21:00 22:30 4/11/2017 4/11/2017 1.00 SLOT WELLPR MILL P Bumped up, space out, flow check, LD 43.0 0.0 22:30 23:30 BHA#1 over a dead well. "'0331 mil 2.80 No Go 4/11/2017 4/12/2017 0.50 PROD1 RPEQPT PULD P Prep and PU BHA#2, 3.5" mono -bore 0.0 0.0 23:30 00:00 whipstock 4/12/2017 4/12/2017 2.00 PROD1 RPEQPT PULD P Prep and PU BHA#2, 3.5" mono -bore 0.0 72.0 00:00 02:00 whipstock, fill hole 26 bbls total during round trip. 4/12/2017 4/12/2017 2.20 PROD1 RPEQPT TRIP P RIH pumping min rate, EDC open, 72.0 9,690.0 02:00 04:12 4/12/2017 4/12/2017 0.20 PRODt RPEQPT DLOG P Tie into K1 for 4 correction. 9,690.0 9,714.0 04:12 04:24 4/12/2017 4/12/2017 0.40 PROD1 RPEQPT WPST P PU Wt 37 k lbs, continue to RIH to 9,714.0 9,897.5 04:24 04:48 9897.5, close EDC, PU 33 k lbs, roll pumps, CT to 3400 psi, good set, SID 3.8k lbs. PU Wt 371k 4/12/2017 4/12/2017 1.70 PROD1 RPEQPT TRIP P Open EDC, POOH pumping 0.75 9,897.0 70.0 04:48 06:30 bpm, tag up 4/12/2017 4/12/2017 1.30 PROD1 RPEQPT PULD P PJSM, flow -check well, LD BHA #2 70.0 0.0 06:30 07:48 4/12/2017 4/12/2017 1.00 PROD1 WHPST SVRG P Break down & blow steam through 0.0 0.0 07:48 08:48 frozen TT hard -lines, service injector and both depth counters. 4/12/2017 4/12/2017 1.50 PRODi WHPST PULD P PJSM, PU BHA #3 Window Milling 0.0 70.0 08:48 10:18 Assembly #1 (2.80" WS mill, 2.80" string reamer, .6° AKO), slide back injector, stab on, tag up. 4/12/2017 4/12/2017 2.30 PROD1 WHPST TRIP P RIH with BHA #3. Pumped 45 bbl 70.0 9,660.0 10:18 12:36 100K LSRV pill down back -side followed by 65 bbl sea water to spot pill in C -Sand perfs, switch to pumping down coil at min rate. 4/12/2017 4/12/2017 0.30 PROD? WHPST DLOG P Tie into K1 for -4.5' correction 9,680.0 9,700.6- 12:36 12:54 4/12/2017 4/12/2017 0.40 PROD1 WHPST TRIP P Continue to RIH, dry lag TOWS at 9,700.0 9,887.0 12:54 13:16 9887' MD 4/12/2017 4/12/2017 4.20 PRODt WHPST MILL P Begin milling window in 3.5" tubing as 9,887.0 9,891.4 13:18 17:30 per procedure, 0° ROHS, Rate in = 1.67 bpm, Rate out = 1.15 bpm, CWT = 3K, WOB = 1.5K. (-68% returns on an open choke). 4/12/2017 4/12/2017 1.20 PROD1 WHPST MILL P Sudden increase in WOB from 1.18k 9,891.4 9,891.4 17:30 18:42 to 2.95 k lbs. continue milling ahead w high differential - 1200 psi. 4/12/2017 4/12/2017 0.60 PROD? WHPST MILL P WOB continued to increase to 3.75. 9,891.4 9,891.4 18:42 19:18 Park coil in atempt to let weight mill off, not milling off, PU 33k lbs, WOB dropped to 1.7 k lbs, restart @ 1.71 bpm. Pumped 10 bbl sweep. 4/12/2017 4/12/2017 0.60 PRODt WHPST MILL P PU as sweep was exiting the nozzle, 9,891.4 9,891.4 19:18 19:54 pulled -5 WOB, CT weight up to 44k, PU's have been 37k lbs, seeing motor work, RBIH, let sweep fully exit, PBUH, pull freely. PUH consult w/ town. Page 2119 Report Printed: 51312017 . Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Depth Start Time EM Time our (hr) Phase Op Cotle ACWKY Code Tena PJ -X Operebw dh(B) EW Depen (W) 4/12/2017 4/12/2017 1.30 PROD1 WHPST DISP - P PUH, open EDC, swap hole over to 9,891.4 9,891.4 19:54 21:12 8.7 ppg, RBIH 4/12/2017 4/12/2017 2.10 PROD1 WHPST MILL P RBIH, set parramelers, 1.7 bpm, CT 9,891.4 9,893.0 21:12 23:18 3076 psi, RIHWt 7 k lbs, free spin diff 347 psi, Run down to 9890.7' clean, start stacking weight, auto drill, WOB 1.19 k lbs, motor work 473 psi diff. TD, allow to mill off WOB down to 600 lbs, dry drift clean. 4/12/2017 4/13/2017 0.70 PROD1 WHPST CIRC P PUH, open EDC, mix and pump 15 9,893.0 9,849.0 23:18 00:00 bbls 9.6 ppg 100 k LSRV pill to the coil 4/13/2017 4/13/2017 0.60 PROD1 WHPST CIRC P continue to pump 15 bbls 9.6 ppg 100 9,849.0 9,849.0 00:00 00:36 k LSRV pill to the coil 4/13/2017 4/13/2017 2.30 PRODt WHPST TRIP P Lay in 9.6 ppg 100k law pill and 9,849.0 89.0 00:36 02:54 POOH. 4/13/2017 4/13/2017 1.10 PROD1 WHPST PULD P Bump up, Flow check, PJSM, inspect 89.0 0.0 02:54 04:00 coil, LD BHA #3 over a tleatl well. mill and reamer both 2.79 No Go 4/13/2017 4/13/2017 2.20 PROD1 WHPST CIRC T Install night cap, PT, PJSM, pump 0.0 0.0 04:00 06:12 Poly Swell LCM treatment, 28.5 bbls, 20 ppb 2.3 bpm, followed by 20 bbls fresh water at 2.5 bpm down 3.5" tubing, displaced with 37.3 bbls of 8.7 ppg milling fluid @ 3.6 bpm. Cul rate to 2 bpm @ 85.8 away. pumped 15 bbls poly swell into the C sands, S/D 100.8 bbl away, WH @ 1383 psi. Wait until 6:15 am to begin squeezing. 4/13/2017 4/13/2017 0.10 PROD1 WHPST SQP2 T After 1 hr from start of mixing stage 0.0 0.0 06:12 06:18 pumps up to 1 bpm in 0.5 bpm increments. Bring rate up tot bpm with initial WHP =611 psi, reached squeeze WHP of 870 psi, bring rate down to .5 bpm and pump until WHP again reaches 870 psi, 1.6 bbl squeezed total. 6:19 am shut down pumps. 4/13/2017 4/13/2017 2.90 PROD1 WHPST COND T Shut down pumps on closed choke, 0.0 0-0- 06:18 09:12 allow WHP to bleed off. Observe relatively rapid decrease trending into a slower decrease in WHP. Bleed WHP to 135 psi and begin to flat line. Confer with town and decision made to PU and RIH with BHA #4. Shut swab valve and line up to MP line and see 0 psi on MP line. Believe 135 psi WHP is residual pump pressure observed on the WH. MP line begins to increase to 6 psi, verify well is dead, open swab valves, watch for flow with nightcap on, no flow, confirm tleatl well, blow down stack 4/13/2017 4/13/2017 1.00 PROD1 WHPST PULD P PJSM, PU BHA #4 (2.80" fat radius O.0 72.0 09:12 10:12 mill, 2.80" string reamer,1.25° Weatherford tapered fixed bent housing motor). Page 3/19 ReportPrinted: 513/2017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth StartTine Ertl Time our (ho Phase Op Code AUivity Corte Time P -T -X Operation (WEn End Depth Mks) 4/1312017 4113/2017 2.30 PROD1 WHPST TRIP P RIH with BHA #4, maintaining tripping 72.0 9,680.0 10:12 12:30 schedule as per town request. Conferred with town and began to RIH with 1 for 1 returns. 4/1312017 4/13/2017 0.30 PROD1 WHPST DLOG P Tie into K1 for -5.5' correction 9,680.0 9,725.0 12:30 12:48 4/13/2017 4/13/2017 1.10 PROD1 WHPST CIRC P Continue to RIH o 9850'to circulate 9,725.0 9,894.0 12:48 13:54 1 1 1 bottoms up as per procedure. 4/13/2017 4/13/2017 2.50 PROD1 WHPST MILL P Weight check PUW = 37K, pumping 9,894.0 9,896.0 13:54 16:24 1.7 bpm, zero WOB, RIH & see WOB at 9894' MO, begin time milling window in 7" casing, oriented 0° ROHS. 4/13/2017 4/13/2017 2.80 PROD1 WHPST MILL P Continue milling window on auto driller 9,896.0 9,897.3 16:24 19:12 (9'-12' below TOWS) . CWT = 4K, WOB = 1.48K, Rate In = 1.68 bpm, Rate Out = 1.41 bpm, dp = 766 psi. CT Wt falling off, attempt to pump pill, fighting residual poly swell issues in pits. Pick up, 34k lbs, RBIH, RIH Wt, 8.3k lbs, off bottom CT 3740 psi, 1.68 bpm in, 1.31 bpm out, free spin 616 psi, OBD WOB 1.11 k lbs, ROP 0.8, CT Wt 7.6 k lbs, Diff 781 psi 4/13/2017 4/13/2017 3.70 PRODt WHPST MILL P WOB fell off from 1.45 k lbs to 0.22 k 9,897.3 9,908.0 19:12 22:54 lbs, Increase ROP to 1.5 ft/hr. 9901 increased ROP and WOB. 4/13/2017 4/14/2017 1.10 PRODt WHPST REAM P TD rat hole, PU 34 k lbs, perform 9,908.0 9,908.0 22:54 00:00 reaming / dressing passes, 30, 330, & 180, while 0 deg ROHS on the up passes. 4/1412017 4/14/2017 1.20 PROD1 WHPST REAM P Complete, perform reaming / dressing 9,908.0 9,908.0 00:00 01:12 passes, 30, 330, & 180, while 0 deg ROHS on the up passes. 4/14/2017 4114/2017 0.10 PROD1 WHPST REAM P Dry drift window down and up, clean. 9,908.0 9,880.0 01:12 01:18 4/14/2017 411412017 1.20 PROD1 WHPST CIRC P Open EDC, pump 44 bbl 120 k LSRV 9,880.0 9,892.0 01:18 02:30 pill down the coil, 1.78 bpm in, 1.55 bpm out. 4/14/2017 4114/2017 1.60 PROD1 WHPST TRIP P POOH while laying in high vis pill and 9,892.0 75.0 02:30 04:06 following tripping schedule. 4/14/2017 411412017 3.00 PROD1 WHPST PULD P Bump up, space out, PJSM, PUD 75.0 0.0 04:06 07:06 1 1 1 BHA#4, prep for & jet stack 4/14/2017 4/1412017 2.90 PROD1 DRILL PULD P PJSM, suck down stack, PU/PD BHA 0.0 72.0 07:06 10:00 #5, L1 lot build drilling assembly (2.4°- AKO, 3.0" RB Baker bit), stab on coil. 'BHA not preloaded in PDL (utilizing same components from previous BHA) 4/14/2017 4/14/2017 1.60 PROD1 DRILL TRIP P RIH with BHA#5 72.0 9,660.0 10:00 11:36 4/14/2017 4/14/2017 0.30 PROD? DRILL DLOG P Tie into K1 for -5' correction 9,660.0 9,705.0 11:36 11:54 4/14/2017 4/14/2017 0.30 PROD1 DRILL TRIP T Close EDC, receive position error, run 9,705.0 9,693.0 11:54 12:12 through calibration troubleshooting sequence. 4114/2017 4/14/2017 0.20 PROD1 DRILL TRIP P Continue to RIH to bottom 9,693.0 9,908.0 12:12 12:24 Page 4119 Report Printed: 51312017' Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth start Time End Time Our (hr) Phase Op Code Amoy Code Time P -T -X Operation (hKB) End Depth (flKB) 4/14/2017 4/14/2017 2.80 PROD1 DRILL DRLG P Drilling Lt build at 9908' MD pumping 9,908.0 9,955.0 12:24 15:12 1.5 bpm, Rate Out = 1.4 bmp, CWT = 8.9K, WOB = -6K, dp = 700 psi. Begin swapping to 8.6 ppg PowerPro drilling fluid at 9930' MD Landing low in build with WOB up to 6K, confer with town, derision made to continue on after further discussion with engineering & geology. Reduce rate from 1.5 bpm to 1.35 bpm to aid in getting desired DLS. 4/14/2017 4/14/2017 2.30 PROD1 DRILL DRLG P Continue drilling at 9955' MD, Rale in 9,955.0 9,975.0 15:12 17:30 = 1.3 bpm, Rate out = 1.17 bpm, CWT = 6.4K, WOB = 4K, free spin = 400 psi, dp = 510 psi, Annular= 3539 psi, holding 11.3 ppg at window, ROP = 7.3 fph, anchorite showing in samples. First survey at 9938' gives a DLS of 33.5°. 4/14/2017 4/14/2017 3.20 PROD? DRILL DRLG P Rate in = 1.47 bpm, Rale out = 1.39 9,975.0 10,050.0 17:30 20:42 bpm, CWT = 5.57K, WOB = 4.15K, free spin = 475 psi, 11.4 ppg at window, ROP = 9.5 ft/hr 4/14/2017 4/15/2017 3.30 PRODi DRILL DRLG P Rate in = 1.51 bpm, Rate out = 1.42 10,050.0 10,152.0 20:42 00:00 bpm, CWT = 2.4K, WOB = 2.42K, free spin = 490 psi, ROP 43.7 ft/hr. Begin pumping 5 x 5 sweep begining at 10299 MD. 4/15/2017 4/15/2017 2.00 PROD1 DRILL DRLG P Off bottom, RIHWt 7.5 k lbs, 1.5 bpm 10,152.0 10,236.0 00:00 02:00 in, 1.32 bpm out, CT 3490 psi, free spin diff 494 psi BOBD, CT wt, 5.6 k lbs, 1.29 WOB, ROP 100 - 20 ft/hr. 4/15/2017 4/15/2017 0.50 PRODi DRILL DRLG P 1.51 bpm in, 1.41 bpm out, CT 3744 10,236.0 10,256.0 02:00 02:30 psi, CT wt, 1.56 k lbs, 1.57 WOB, short drilling breaks to 100 ft/hr, with doldrums of 20 Whir. Multiple pick ups, 40 - 45k lbs 4/15/2017 4/15/2017 1.20 PROD1 DRILL DRLG P 1.51 bpm in, 1.43 bpm out, CT 3454 10,256.0 10,259.0 02:30 03:42 psi, CT wt, -3.3k lbs, 1.59 WOB, ROP 3. Suspect Ankerite. 4/15/2017 4/15/2017 1.00 PROD1 DRILL DRLG P Broke through at 10260. 1.51 bpm in, 10,259.0 10,287.0 03:42 04:42 1.41 bpm out, Ct Wt 1.5 k lbs, 1.74 k lbs, WOB, ROP 88 ft/hr. 2nd layer @ 10287' 4/15/2017 4/15/2017 0.20 PROD1 DRILL DRLG P On short trip, trouble working back 10,287.0 10,287.0 04:42 04:54 through 10257 - 10258. First suspect ankerite lens. 4 attempts. went right through @ 70 LOHS. 4/15/2017 4/15/2017 0.40 PROD1 DRILL DRLG P BOBD, 1.46 bpm in, 1.41 bpm out, CT 10,287.0 10,278.0 04:54 05:18 3382, Ctwt -2.72 k lbs, annular 3534 psi, 1.85 k lbs WOB, ROP -0. free spin diff 500 psi, on bottom 461 psi? PD, RBIH, 35 ft,min, stack 2.14 k lbs, motor work went from 490 psi to 456 psi. Page 5119 Report Printed: 5/3/2017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sten Depin Stan Tim End Tim Our (no Phase Op Cade ActivM Code Time P -T -X Operation (nKB) End Depin(WB) 4/15/2017 4/15/2017 1.00 PRODt DRILL DRLG P PU, 48k lbs, increase rate to 1.66 bpm 10,287.0 10,298.0 05:18 06:18 in, 1.63, RBIH, 40 ft/min. free spin 600 psi, on bottom 555 psi. CT wt - 3.7 k lbs, WOB 2.31 k lbs, ROP 0. 4/15/2017 4/15/2017 0.90 PROD1 DRILL DRLG P Continual PU's getting going, 10,298.0 10,300.0 06:18 07:12 encountering Ankerite stingers, CWT _ -3.7K, WOB = 2K, Rate In = 1.67 bpm, Rate Out = 1.64 bpm. ROP varies form 150 fph down to 7 fph. 4/15/2017 4/15/2017 0.40 PROD1 DRILL WPRT P Wiper Trip up -hole, PUWt=38K 10,300.0 9,677.0 07:12 07:36 4/15/2017 4115/2017 0.40 PROD1 DRILL DLOG P Tie into Kt for+4' correction, tie into 9,677.0 9,896.0 07:36 08:00 RA tag and correlate to 9896'. 4115/2017 4115/2017 0.40 PROD1 DRILL WPRT P Wiper Trip in-hole, pumping minimum 9,896.0 10,300.0 08:00 08:24 rate, orient 70° LOHS at 10257' MD, RIW = 6.5K, tag weight at 10,287' MD, PUH, RBIH orient tool face to 30" LOHS & get by. 4115/2017 4115/2017 1.90 PROD? DRILL DRLG P BOBD at 10,300' MD, CWT = -2.7K, 10,300.0 10,317.0 08:24 10:18 WOB = 3K, Rate In = 1.7 bpm, Rate Out = 1.64 bpm. Difficulty making footage with Siderite observed over shakers. Appear to be getting into the base of C -Sand. PU at 10,317, PUW = 44K, RIW = 5K, difficulty working past 10,300' MD & 10,316'. 4/15/2017 4/15/2017 1.00 PRODt DRILL REAM T PU from 10,316' MD, Begin pulling 10,317.0 10,317.0 10:18 11:18 tight at 10,316' MD, Pulling 67K CWT, WOB = -10K, hanging up, unable to PUH or RIH, unable to orient (amping out on HOT), eventually broke free. Difficulty getting to bottom past 10,258' MD. RIH at minimum rate past 10,2571, 10287'. Orient tool face to 70 LOHS to in attempt to pass 10,314' MD, unable to pass 10,314' MD Begin back reaming out of hole oriented as drilled up to 10,240' MD at 1.8 bpm. RBIH at minimum rate, as drilled TF, clean by 10,257', slight bobble at 10,287', begin stacking weight at 10,314', orient TF to 90° to get by, begin stacking weight at 10,316' MD, orient 90° LOHS to get by. 4/15/2017 4/15/2017 0.20 PROD1 DRILL DRLG P BOBD at 10322' MD, Rate In = 1.7 10,317.0 10,323.0 11:18 11:30 bpm, Rate Out = 1.43 bpm, CWT = - 1.2K, WOB = 2.65K. Difficulty making forward progress. Page 6119 Report Printed: 5/3/2017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Stan Time End Time our (hr) Phase Op Code Acb sty Code Time P -T -X Opemwn (W End Depth (nKB) 4/15/2017 4/15/2017 0.40 PROD1 DRILL REAM T Back ream up -hole oriented as drilled 10,323.0 10,323.0 11:30 11:54 TF up to 10,300' MD, up past trouble spots at 10,316'& 10,314' MD, begin pulling heavy at 10,309' MD RBIH at minimum rate, clean past 10,309', stacking weight at 10,314', orient TF & pass, slight WOB bobble at 10,316', BOB. 4/15/2017 4/15/2017 1.90 PROD1 DRILL DRLG P BOBO, pumping 1.7 bpm. CWT=- 10,323.0 10,340.0 11:54 13:48 4.41K, WOB = 3.3K, PUW = 50K from10,325'. Back ream up past 10,316'& 10,314' MD. RBIH at minimum rate (.5 bpm), better past 10,314'& 10,316'. BOBD. PUW = 52K from 10,326'MD. Continual PU's to make forward progress. Trouble spot at 10,332' MD when RIH, 4/15/2017 4/15/2017 2.50 PROD1 DRILL DRLG P Continue drilling, CWT= -5.5K, WOB 10,340.0 10,373.0 13:48 16:18 = 2.91K, Rate In = 1.7 bpm, Rate Out = 1.66 bpm. Began pumping 20 bbl pill at 10,330'(2% 776 & 2% LoTorq). Unable to get going with pill out the bit, PU & RIH to attempt to get started drilling Began drilling at 99 fph at 10,344' MD as pill comes around. ROP drops off significantly with pill out of the hole. Pump 17 bbl pill (1% 776, 1 % LoTorq, 2 ppb beads), Observe improvement in weight transfer with pill around, though not as significant as the pervious pill. 4/15/2017 4/15/2017 1.20 PROD1 DRILL DRLG P Continue drilling at 10,373 with 10,373.0 10,382.0 16:18 17:30 beaded pill around the back -side. CWT = -6K, WOB = 1.5, ROP = 14.5 fph. PU from 10,374', PUW = 50K. 4/15/2017 4/15/2017 1.30 PROD1 DRILL DRLG P Slow drilling w negative surface 10,382.0 10,390.0 17:30 18:48 weights and multiple pick ups / restarts. Verify w Geo and MWD that we're in sufficient sand for the transition to let drilling assembly and DO ok with projected path forward to plan. 4/15/2017 4/15/2017 3.50 PROD1 DRILL WPRT P Pump 10x10 low/hi vis sweep and 10,390.0 61.0 18:48 22:18 begin slowly back reaming / pulling off bottom @ 10 ft/hr. PU 49 k lbs. Jog in build, pull into open hole, open EDC, pumps to 2.25 bpm while POOH. Saw slight over pull at GLM #7, 9413' CTMD, RBIH, same, continue to POOH. 95% returns while POOH. saw GLM and SSSv, , neg Wt on bit while POOH. Lots of metal and beads at the shaker and a few small rocks. Bleed IA and OA. Page 7/19 Report Printed: 5/3/2017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time EM Time Dur (hr) Phase Op Code Activity Code Tigre PJA Operation (ftKB) End Depth (ftKB) 4/15/2017 4/16/2017 1.70 PRODt DRILL PULD P PJSM, Bump up / space out. PUD 61.0 0.0 22:18 00:00 BHA #5, LD BHA #5. Inspect pipe 20 back - good. 4/16/2017 4/16/2017 1.50 PRODt DRILL PULD P PU / PD BHA #6, Ll let drilling 0.0 81.0 00:00 01:30 assembly, inspect pack offs - good. stab on bump up. "" BHA pre loaded in PDL 4/16/2017 4/16/2017 1.90 PRODt DRILL TRIP P RIH 100 feet, close EDC, test agitator, 81.0 9,695.0 01:30 03:24 good. continue to RIH w EDC closed, pumping min rate holding managed pressure. 4/16/2017 4/16/2017 0.20 PROD1 DRILL DLOG P Tie into th K1 for a -7.5' correction 9,695.0 9,716.0 03:24 03:36 4/16/2017 4/16/2017 0.40 PRODt DRILL TRIP P Continue to RIH, all previous tight 9,716.0 10,390.0 03:36 04:00 spots, 10,257, 10,287, 10,314, 10,316, & 10,380 - dean. 4/16/2017 4/16/2017 0.40 PROD1 DRILL DRLG P RIHWt, 8 k lbs, 1.76 bpm in, 1.65 10,390.0 10,444.0 04:00 04:24 bpm, free spin diff 1090 psi. OBD, CT Wt 2 klbs, WOB 1.38 k Ibs, ROP 260 ft/hr 4/16/2017 4/16/2017 0.20 PROD1 DRILL DLOG P Check shot off, PUH for survey, RBIH, 10,444.0 10,444.0 04:24 04:36 all good. 4/1612017 4/16/2017 1.30 PROD1 DRILL DRLG P BOBD, CT Wt 5 k lbs, WOB 1.21 k 10,444.0 10,673.0 04:36 05:54 Ibs, ROP 100-550 ft/hr with differential sticking, PU's - 48-49k lbs 4/16/2017 4/16/2017 0.30 PROD1 DRILL WPRT P Wiper up -hole, PUW = 47K 10,673.0 10,000.0 05:54 06:12 4/16/2017 4/16/2017 0.30 PRODi DRILL WPRT P Wiper in-hole, minimum rate through 10,000.0 10,673.0 06:12 06:30 build, RIW = 5K 4/16/2017 4/16/2017 4.00 PROD1 DRILL DRLG P BOBD at 10,673' MD. Rate In = 1.8 10,673.0 11,039.0 06:30 10:30 bpm, Rate Out = 1.67 bpm, CWT = 5K, WOB = .5K free spin = 1150 psi, drilling dp = 1300 psi, ROP = -400 fah. Performing BHA wipers as necessary. PUW = 47K from 10,889' MD, pumping 5x5 sweeps as required. PUW = 48K from 10,998' MD, PUW = 51 K from 11,030' MD. 4/16/2017 4/16/2017 0.70 PROD1 DRILL DRLG P 18 bbl new mud pill exiting bit at 11,039.0 11,080.0 10:30 11:12 11,039' 1little improvement observed). CWT = -1.2K, WOB = 1.5K, free spin = 1240 psi, dp = 1340 psi, ROP -65 fph. 4/16/2017 4/16/2017 0.60 PROD1 DRILL WPRT P Pump 5x5 sweep, wiper up -hole, PUW 11,080.0 9,880.0 11:12 11:48 = 44K, jog build section, clean up & down through build 4/16/2017 4/16/2017 0.50 PROD1 DRILL WPRT P Wiper in-hole, RIW=6K 9,880.0 11,080.0 11:48 12:18 4/16/2017 4/16/2017 3.00 PROD1 DRILL DRLG P BOBO, free spin = 1235 psi, CWT 11,080.0 11,297.0 12:18 15:18 =.5K, WOB = 1 K, dp = 1,462 psi, ROP 60-130 fph. DO experiencing difficulty building to 92° from -11,130' with little WOB. 4/16/2017 4/16/2017 1.20 PRODt DRILL DRLG P Continue drilling at 11,297', began 11,297.0 11,368.0 15:18 16:30 building 20 bbl 2% 776 2% LoTorq pill. CWT = -4K, WOB = 360 lbs, dp = 1336 psi. Pill did little to increase weight transfer. 4/16/2017 4/16/2017 0.30 PRODi DRILL WPRT P Early 500 wiper, PUW = 43K, 11,368.0 11,368.0 16:30 16:48 attempting to improve weight transfer Page 8/19 Report Printed: 51312017 a Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End rime Our(hr) Phase op Code Adrvey Code Time P -T -X Operation stars cepm (ttKB) End Depth(MB) 4/16/2017 4/16/2017 2.20 PROD1 DRILL DRLG P Drilling ahead with fragile weight 11,368.0 11,490.0 16:48 19:00 transfer, CTWt -0 - -6 klbs, WOB 0.5 k lbs. Multiple pick ups with trouble getting restarted. Mix and pump 20 bbl 2 ppb alpine bead high vis pill 4/16/2017 4/16/2017 1.50 PRODt DRILL DRLG P Average PU weights drop from - 53 k 11,490.0 11,581.0 1900 20:30 lbs to 40 k. WOB stayed the same, sub 1 k lbs. ROP appeared to vary with formation, CT Wt remained constant around -5.5 klbs throughout the sweep. Easier to turn around and lower PU's were the only benefit. 4/16/2017 4/16/2017 0.70 PROW DRILL DRLG P Mix and pump pill of 15 bbls of 10% 11,581.0 11,614.0 20:30 21:12 LVT 200 in new mud. Similar results, or lack of, with regards to CT Wt and WOB. Continue to have weight transfer issues, Pump 10x10 low hi vis pill. 4/16/2017 4/16/2017 1.50 PROD1 DRILL WPRT P Long wiper to window, PU W147 k lbs, 11,614.0 9,690.0 21:12 22:42 Chase sweeps up hole, jog in the build. Lots of dark cutting to the screen, no rocks. Open EDC, pump 10x10 sweep at 2.29 bpm. 4/16/2017 4/16/2017 0.30 PROD1 DRILL DLOG P Tie into the K1 for a -10' correction. 9,690.0 9,760.0 22:42 23:00 4/16/2017 4/16/2017 0.80 PROD1 DRILL TRIP P Close EDC, RBIH, CT weight fell from 9,760.0 11,614.0 23:00 23:48 7 k lbs to negative by 10,200', CT wt broke back over, 11,380, 4 k lbs. 4/16/2017 4/17/2017 0.20 PROD1 DRILL DRLG P RIH Wt 4.5 k Ibs @ 22 ft/hr, Ct 5083 11,614.0 11,640.0 23:48 00:00 psi, 1.75 bpm in, 1.67 bpm out, freespin diff 1142 psi. OBD CT Wt - 6.12 lbs, WOB 1.36 k lbs, ROP 85 If/hr. 4/17/2017 4/17/2017 2.00 PROD1 DRILL DRLG P OBD CT Wt neg 6 -7 Ibs, WOB 1.0- 11,640.0 11,726-0- 00:00 02:00 0.4 k lbs, ROP 85-30 ft/hr. Free spin diff 1160 psi. Drill for 20 to 30 min at a time between pick ups. 4/17/2017 4/17/2017 1.40 PROD1 DRILL DRLG P Cul rate from 1.8 bpm to 1.5bpm. 11,726.0 11,769.0 02:00 03:24 OBD Ct 4230 psi. CT Wt -7, WOB 0.77 k lbs, ROP 50-20 ft/hr. Free spin diff 930 psi. Start shipping old mud, Sylem #1, outside for mud swap. Start new mud down the coil @ 02:53. 4/17/2017 4/17/2017 0.50 PROD1 DRILL DRLG P New mud at the bit, increase rate back 11,769.0 11,784.0 03:24 03:54 to 1.78 bpm, Ct 4875 psi, 1.78 bpm in, 1.76 bpm out, 1223 psi free spin diff. CT Wt -7.2 k Ibs, WOB 0.75 k lbs, ROP 50 ft/hr 4/17/2017 4/17/2017 3.50 PROD1 DRILL DRLG P PU 47 k lbs, Increase rate back to 11,784.0 11,916.0 03:54 07:24 1.85 bpm, Ct 4923 psi, 1.85 bpm in, 1.83 bpm out, 1230 psi free spin diff. CT Wt -6 k lbs, WOB 1.26 k lbs, ROP 50-30 ft/hr Page 9119 Report Printed: 5/312017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM Depth Start Time EM Time our (hr) Phase Op Code Ac ivAy Code Time P -T -X Operation (flKB) End Depth (MB) 4/17/2017 4/17/2017 3.40 PROD1 DRILL DRLG P Continue drilling at 11,916'. CWT=- 11,916.0 12,020.0 07:24 10:48 6K, WOB =AK, Rate In = 1.6 bpm, Rate Out = 1.53 bpm, free spin = 960 psi, dip = 1051 psi. Pumping sweeps as required. 4/17/2017 4/17/2017 0.40 PROD1 DRILL WPRT P Wiper up -hole, PUW=43K 12,020.0 10,956.0 10:48 11:12 4/17/2017 4/17/2017 0.30 PROD1 DRILL WPRT P Wiper in-hole, RIW=6.5K 10,956.0 12,020.0 11:12 11:30 4/17/2017 4/17/2017 4.20 PRODi DRILL DRLG P OBD, CWT= -6K, WOB=.9K, Rate= 12,020.0 12,192.0 11:30 15:42 1.8 bpm, free spin = 1200 psi, dp = 1297 psi, ROP -50-80 fph. Reduced rate to 1.5 bpm to reduce vibration, BHA wiper from 12,108', PUW = 44K, began pumping 5x5 sweep at 12,111'. 15:00 hours, prepare to trip for bit as per town request. Continue drilling as sweeps reach the bit. 4/17/2017 4/17/2017 4.80 PROD1 DRILL TRIP P POOH to PU new bit. 12,192.0 76.0 15:42 20:30 Pump sweeps, jog build, pulling heavy from 9946'-9942', RBIH & circulate, still observe overpull at 9,943'(48K), pause to adjust level wind, surface test agitator with significant vibratioi observed at 1.7 bmp, tag up. 4/17/2017 4/17/2017 1.30 PROD1 DRILL PULD P PJSM, PUD BHA #6, evaluate motor, 76.0 0.0 20:30 21:48 spins loose, will PU new motor. LD Weatherford motor. 4/17/2017 4/17/2017 0.20 PROD1 DRILL BOPE P BOP function test 0.0 0.0 21:48 22:00 4/17/2017 4/17/2017 1.20 PROM DRILL PULD P PJSM, PU/PD BHA #7 Lateral Drilling 0.0 81.0 22:00 23:12 Assembly #2(new.4°Weatherford motor & Hycalog B8 bit), tag up. 4/17/2017 4/18/2017 0.80 PROD1 DRILL TRIP P Begin RIH with BHA#7 81.0 4,168.0 23:12 00:00 4/18/2017 4/18/2017 1.00 PROM DRILL TRIP P Continue to RIH 4,168.0 9,700.0 00:00 01:00 4/18/2017 4/18/2017 0.20 PROD1 DRILL DLOG P Tie into the K1 for a - 0.5' correction 9,700.0 9,715.0 01:00 01:12 4/18/2017 4/18/2017 1.00 PROD1 DRILL TRIP P Continue to RIH, CT wt quite diferent 9,715.0 12,192.0 01:12 02:12 from last trip in hole. - 7 kibs RIH Wt @ 50 Nmin. Started haing isues w weight transfer @ 12000, 4/18/2017 4/18/2017 1.00 PROD1 DRILL DRLG P RIH Wt 4.22 K lbs w pumps at min 12,192.0 12,227.0 02:12 03:12 rate, 0 w pumps at drilling rate, pump at 1.72 in 1.74 out. free spin diff 1255 psi. OBD limit CT Wt snub to -2 k lbs WOB 1.67 k lbs ROP 60-20 ft/hr, averaged 35 ft/hr Down hole vibrations excessive, 4-5. 4/18/2017 4/18/2017 1.00 PROM DRILL DRLG P OBD Ct 4774 1.70 in 1.67 out. 12,227.0 12,267.0 03:12 04:12 Increase Ct Wt to limint of -6 k lbs, WOB 0.48 k lbs ROP 60-20 ft/hr averaged 40 ft/hr 4/18/2017 4/18/2017 2.20 PROM DRILL DRLG P OBD Ct 4323 1.5 in 1.44 out. Cl Wt -6 12,267.0 12,315.0 04:12 06:24 It lbs, WOB 1.6 It lbs ROP 60-20 fl/hr averaged 22 ft/hr Page 10119 Report Printed: 51312017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time log S= Depth SWO Time EM Tim oivlh0 Mese Op Code Activity CMe Time P -T -X Operefion (WS) EM Oeplh(M(6) 4/18/2017 4/18/2017 2.00 PRODI DRILL DRLG P OBD Ct 5290 1.82 bpm, free spin 12,315.0 12,365.0 06:24 08:24 diff1350 Ct Wt -2 k lbs, WOB 0.42 k lbs ROP20.40 Pump 15 bbl of 2 ppb beaded pill 4/18/2017 4/18/2017 0.50 PRODI DRILL WPRT P Wiper trip #1,850' 12,365.0 11,502.0 08:24 08:54 4/18/2017 4/18/2017 0.50 PROD1 DRILL WPRT P RBIH 11,502.0 12,365.0 08:54 09:24 4/18/2017 4/18/2017 0.60 PROD1 DRILL DRLG P OBD Beaded pill coming out the bit. 12,365.0 12,399.7 09:24 10:00 Ct 5290 1.82 bpm, free spin diff1350 Ct Wt -2 k lbs, WOB 0.42 k lbs ROP2040 Drilled into something hard @ 12399', WOB up to 3.7 + Stalled no reactive torque seen on tool face. 4/18/2017 4/18/2017 2.20 PROD1 DRILL DRLG T Drilled with no progress, multiple pick 12,399.7 12,399.0 1000 12:12 ups to 60 k lbs. Holding weight on bit, diferential seems to not be reactive. Second to last trip in saw WOB 3' early up to 2.5 k lbs. PUH 50 k lbs repeal, Abort, 4/18/2017 4/18/2017 2.60 PROD1 DRILL WPRT T POOH, 45 k PU 12,399.0 87.0 12:12 14:48 4/18/2017 4/18/2017 1.80 PROD1 DRILL PULD T Bump up, space out, PUD & LD BHA 87.0 0.0 14:48 16:36 #7 Bottom section of motor and bit not recovered from the well. 4/18/2017 4/18/2017 2.50 PROD1 DRILL PULD T Wait on BOT due to Doyon 19 ramp 0.0 0.0 16:36 19:06 move blocking Spine road. Clean floor and prep to run open hole anchored billet. 4/18/2017 4/18/2017 2.50 PROD1 STK PULD T Load tools in PDL. PD Anchored billet 0.0 72.9 19:06 21:36 BHA #8. 4/18/2017 4/18/2017 1.80 PROD1 STK TRIP T Bump up, Reset counters. RIH with 72.9 9,600.0 21:36 23:24 BHA #8. 4/18/2017 4/18/2017 0.20 PRODI STK DLOG T Tie-in to the K1 for a -7.5 ft correction. 9,690.0 9,708.0 23:24 23:36 4/1812017 4/19/2017 0.40 PROD1 STK TRIP T Continue running in the hole towards 9,708.0 10,400.0 23:36 00:00 anchored billet set depth. 4/19/2017 4/19/2017 0.50 PROD1 STK TRIP T Continue running in the hole with 10,400.0 10,414.0 00:00 00:30 anchored billet BHA #8. Stacked out at 10,407 ft. PU and attempt to run back through with no success. Varied running speed from 10 fpm to 20 fpm, also varied toolface to try and work past ledge. 4/19/2017 4/19/2017 2.50 PRODI STK TRIP T Discuss with town. Made decision to 10,414.0 80.0 00:30 03:00 POOH and PU a clean out assembly. POOH. 4/19/2017 4/19/2017 1.20 PROD1 STK PULD T PUD BHA #8. No observations of any 80.0 0.0 03:00 04:12 damage or wear on the anchored billet assembly. 4/19/2017 4/19/2017 1.30 PRODI STK PULD T PU and PD Clean out BHA #9 with 0.0 80.0 04:12 05:30 agitator, 0.5° motor, and D331 mill (ridgeset and upcutters) 4/19/2017 4/19/2017 2.20 PRODI STK TRIP T RIH, swapped chokes at- 4000 feet, 80.0 9,685.0 05:30 07:42 saw some indication of choke B packing off. 4/19/2017 4/1912017 0.20 PROD1 STK DLOG T Tie into K1 for - 8' correction. 9,685.0 9,712.0 07:42 07:54 Page 11119 Report Printed: 513/2017 Operations Summary (with Timelog Depths) C 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stun Depm Stan Time eml Time Our (hr) Phase Op Corte Activity Code Time P -T -X Operation (Itl(a) EM Depth (ftKO) 4/19/2017 4/19/2017 1.00 PROD1 STK TRIP T Continue to RIH, window transparent 9,712.0 11,865.0 07:54 08:54 @ 28ft/minule. RIH orienting as drilled. one small WOB boble at 10,371'.2 k to 1.0 k. Tagged up 3x on suspected fish at 11865'. 1st 50 ftimin at 1.2 bpm, 2nd @ 50 ft/min & min rate, 3rd @ 30 ft/min & min rate. 4/19/2017 4/1912017 0.30 PROW STK TRIP T PUH while waiting on town 11,865.0 11,587.0 08:54 09:12 4/1912017 4/19/2017 0.20 PROW STK TRIP T RBIH to above fish to start back 11,587.0 11,600.0 09:12 09:24 reaming pass while town picks new KO point, PU 40k 4/19/2017 4/19/2017 0.90 PROW STK REAM T OBD, 1.80 bpm, CT 4821 psi, free 11,600.0 10,360.6- 09:24 10:18 spin diff 1049 psi, start back reaming pass at 25 ft/hr oriented high side. pump 10x10 pill 4/19/2017 4/19/2017 0.40 PROD1 STK TRIP T RBIH, 11,587.0 11,600.0 10:18 10:42 4/19/2017 4/19/2017 1.30 PROW STK REAM T OBD, 1.82 bpm, CT 4715 psi, start 11,600.0 9,945.0 10:42 12:00 back reaming pass at 25 ft/hr. oriented low side. Pill exiling the bit @11,700 chase up hole. saw slight neg weight on bit and bobble in motor work at 10134'. 4/19/2017 4/19/2017 2.00 PROD1 STK TRIP T Set tool face to HIS for pulling through 9,945.0 67.0 12:00 14:00 the window pumps to min rate. saw neg weight on bit at 9888' and 9864'. park, open EDC. POOH pumping 1.8 bpm to surface. 4/19/2017 4119/2017 2.00 PROD1 STK PULD T Bumped up, spaced out, PUD and LD 67.0 0.0 14:00 16:00 BHA #9. 4/19/2017 4/19/2017 2.50 PROD1 STK PULD T PU BHA #10, PD, inspected coil 20 0.0 70.0 16:00 18:30 back from connecter, clean. 4/19/2017 4/19/2017 3.50 PROD1 STK TRIP T RIH with BHA #10. Tie in to the K1 for 70.0 11,590.0 18:30 22:00 a -6.5 ft correction. Close EDC above the window. Clean trip through window and build section. Position billet on depth. 4/1912017 4/19/2017 0.20 PROD1 STK WPST T Confirm TOB at 11,575 ft and slip 11,590.0 11,590.0 22:00 22:12 oriented 30° LOHS. Bring up pump up. Saw anchors set at 4,400 psi. Set 2KIbs down on billet to confirm set. 4/19/2017 4/20/2017 1.80 PROD1 STK TRIP T POOH with BHA #10. 11,590.0 3,200.0 22:12 00:00 4/20/2017 4/20/2017 0.50 PROD1 STK TRIP T Continue POOH with BHA #10, 3,200.0 61.0 00:00 00:30 Anchored Billet running tools. 4/20/2017 4/2012017 1.00 PRODt STK PULD T PUD BHA #10. 61.0 0.0 00:30 01:30 4120/2017 4/20/2017 2.00 PROD1 STK PULD T PU and PD BHA #11, with agitator, 0.0 78.0 01:30 03:30 0.5° AKO motor, and RB HYC bit, 4/20/2017 4/20/2017 3.30 PROD1 STK TRIP T RIH with BHA #11. Shallow test 78.0 9,813.0 03:30 06:48 agitator at 1.7 bpm. Positive indication tool is working. Continue in the hole. Send 25 bbls Steel -Lube EP pill with 10bbls freshwater ahead and 5bbis freshwater behind. 4120/2017 4/20/2017 0.80 PROD1 STK TRIP T Continue to RIH, pumps down, dry tag 9,813.0 11,577.0 06:48 07:36 TOB @ 11577.99. PU, 44 k lbs Page 12119 ReportPrinted: 5/3/2017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Deem Start Time End Time our (hr) Phase Op Come Acllvity Cade Time P4 -X Operation (fit®) End Depen (WB) 4/20/2017 4/20/2017 0.60 PROM STK KOST T RBIH, set rate @ 1.80 bpm, CT 5000 11,577.0 11,577.0 07:36 08:12 psi, free spin diff 1188 psi,RIH Wt 5.15 k lbs, tag billet top at 11575'. Start time drilling to kick off, target 1 f 1hr 4/20/2017 4/20/2017 1.00 PROD1 STK KOST T RBIH, set rale @ 1.80 bpm, CT 5000 11,577.0 11,585.0 08:12 09:12 psi, free spin diff 1188 psi,RIH Wt 5.15 k lbs, lag billet top at 11575'. Start time drilling to kick off, target 2 ft/hr 4/20/2017 4/20/2017 0.40 PROM DRILL DRLG T Drilling ahead at CT 5133 psi, 1.80 11,585.0 11,600.0 09:12 09:36 bpm, CT Wt 6.3 k lbs, WOB 1.46 k lbs. ROP 45 ft/hr 4/20/2017 4/20/2017 0.20 PROD1 DRILL DRLG T PU 42k lbs PUH, to 11570, clean, 11,600.0 11,600.0 09:36 09:48 RBIH, min rate past billet, clean. 4/20/2017 4/20/2017 2.40 PROM DRILL DRLG T BOBD, CT Wt -1.0 k lbs, WOB 1.4k 11,600.0 11,704.0 09:48 12:12 lbs, ROP 40 fUhr 4/20/2017 4/20/2017 0.20 PROD1 DRILL WPRT T missed a survey, PU to get it, 44 klbs, 11,704.0 11,704.0 12:12 12:24 trouble runing back in hole. varied rate to slide. 4/2012017 4/20/2017 2.30 PROW DRILL DRLG T BOBO, CT Wt -1.6 k lbs, WOB 1.7 k 11,704.0 11,761.0 12:24 14:42 lbs, ROP 38 ft/hr 4/20/2017 4/20/2017 0.20 PROD1 DRILL WPRT T PU to get restarted. 55 klbs, RBIH 11,761.0 11,761.0 14:42 14:54 4/20/2017 4/20/2017 2.10 PROD1 DRILL DRLG T BOBO, CT Wt 5.2 k lbs, WOB 1.44 k 11,761.0 11,813.0 14:54 17:00 lbs, ROP 38-50 ft/hr 1.80 bpm pumped 10 bbls beaded pill. Didn't see much benefit. 4/20/2017 4/20/2017 5.50 PROD1 DRILL DRLG T Continue drilling. CTW = (-)6KIbs, 11,813.0 12,012.0 17:00 22:30 WOB 1.5KIbs, ROP 30 fph. 1.84 bpm. Pumped beaded pills with marginal benefit. 4/20/2017 4120/2017 0.20 PROD1 DRILL WPRT T PUH for planned wiper trip. PUW=44 12,012.0 11,600.0 22:30 22:42 KIM. 412012017 4/20/2017 0.20 PROD1 DRILL WPRT T RBIH. SOW = (-)5 Klbs. 11,600.0 12,012.0 22:42 22:54 4/20/2017 4/21/2017 1.10 PROD1 DRILL DRLG T BOBO, CT Wt (-) 7 k lbs, WOB 1.5 k 12,012.0 12,060.0 22:54 00:00 lbs, ROP 45 ff/hr 4/21/2017 4/2112017 4.00 PROD1 DRILL DRLG T BOBO, CT Wt (-)4 to (-)7 Klbs, WOB 12,060.0 12,183.0 00:00 04:00 1.5 k lbs, ROP 20-50 ft/hr Tried to adjust drilling parameters to improve weight transfer and ROP. 4/21/2017 4/21/2017 2.90 PROD1 DRILL DRLG T BOBO, CT Wt (-)4 to (-)7 Klbs, WOB 12,183.0 12,269.0 04:00 06:54 1.5 k lbs, ROP 20-50 it/hr pumped 25 bbl 'cadillacc' pill, 1 ppb beads and 2% lubes, 4% total, Decent response, able to drill with positive o slightly negative surface weight, not much WOB change, ROPs still seem to be formation dependant. 4/21/2017 4/21/2017 0.90 PROD1 DRILL WPRT T PU Wt 45 k, wiper to window for tie in 12,269.0 9,920.6- 06:54 07:48 4/21/2017 4/2112017 0.20 PROD1 DRILL DLOG T Tie in for+ 5.5' correction. 9,920.0 9,938.0 07:48 08:00 4/21/2017 4/21/2017 0.90 PROD1 DRILL TRIP T RBIH, RIH Wt 7.2 k lbs, tapering to 6.2 9,938.0 12,269.0 08:00 08:54 k @ 50 f/min, by 11,500', 1 k@ 12,000 reduce RIH speed to 25 ft/min Page 13119 Report Printed: 5/3/2017 e - Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Time Fad Time Our (hr) Phase Op Code Activity Code Time P -T -X Opembon (nKB) End Depth(1IKS) 4/21/2017 4/21/2017 1.00 PROD1 DRILL DRLG T BOBO, 1.81 bpm, free spin diff 1033 12,269.0 12,322.0 08:54 09:54 psi, CT wt 0 k lbs, WOB 1.6 k lbs, ROP 83- 4/21/2017 4/21/2017 0.60 PROM DRILL WPRT T PU, 62 k Ibs. Short BHA wiper, ( 475) 12,322.0 12,322.0 09:54 10:30 longer because we could not tum around, pulled to 11,850'to turn around, ( hot gamma spike @ 11,898') RBIH 4/21/2017 4121/2017 1.60 PROD1 DRILL DRLG T BOBO, 1.81 bpm, free spin diff 1033 12,322.0 12,361.0 10:30 12:06 psi, CT wt 0 k lbs, WOB 1.6 k lbs, ROP 83-14 ( averaged 39 ft/hr while on botom 4/21/2017 4/21/2017 0.60 PROD1 DRILL WPRT T PU, 62 k lbs. Short BHA wiper, ( 561) 12,361.0 12,361.0 12:06 12:42 longer because we could not turn around, pulled to 11,800' to tum around. Sample of aluminum back at the shaker, much more than we had been getting. RBIH, 4/21/2017 4/21/2017 1.10 PROD1 DRILL DRLG T BOBD, 1.80 bpm, free spin diff 1075 12,361.0 12,399.0 12:42 13:48 psi, CT wt 4.8 k lbs, WOB 0.5k lbs, ROP 40 4/21/2017 4/21/2017 3.20 PROD1 DRILL DRLG P Off trouble time 12,399.0 12,486.0 13:48 17:00 OBD, 1.80 bpm, free spin diff 1075 psi, CT wt 2 to -4 k lbs, WOB 0.5-1 k lbs, ROP 40-17 sending 10 bbl cadillac pills every - 100 bbls to slay drilling. 4/21/2017 4/21/2017 2.40 PROD? DRILL WPRT P PU, 62 k lbs. Short BHA wiper, ( 736') 12,486.0 7,800.0 17:00 19:24 longer because we could not tum around, pulled to 11,750'to turn around. RBIH. Slacked out while RIH. PUH again. Continue pulling wiper to 7800 ft. (2,089 ft inside the window). 4/21/2017 4/21/2017 1.70 PROD1 DRILL WPRT P RBIH, SOW = 7 Klbs. Clean trip 7,800.0 12,486.0 19:24 21:06 through window and build. 4/21/2017 4/21/2017 0.70 PROD1 DRILL DRLG P BOBD, 1.80 bpm, free spin diff 1075 12,466.0 12,518.0 21:06 21:48 psi, CT wt -6 k lbs, WOB 0.5k lbs, ROP 40 fph 4/21/2017 4/21/2017 0.40 PROM DRILL WPRT P PUH for BHA wiper to help improve 12,518.0 11,900.0 21:48 22:12 weight transfer. PU = 62KIbs. Had to continue to PUH to 11,900 before we could tum back around. 4/21/2017 4/21/2017 0.30 PROD1 DRILL WPRT P RBIH. SOW = XX Klbs. 11,900.0 12,518.0 22:12 22:30 412112017 4/21/2017 0.90 PROD1 DRILL DRLG P BOBD, 1.80 bpm, free spin diff 1075 12,518.0 12,549.0 22:30 23:24 psi, CT wt -8 k lbs, WOB 0.4k lbs, ROP 40 fph 4/2112017 4/21/2017 0.20 PROD1 DRILL WPRT P PUH for BHA wiper to help improve 12,549.0 12,075.0 23:24 23:36 weight transfer. PU = 63KIbs. Had to continue to PUH to 12,075 ft before we could tum back around. 4/21/2017 4/21/2017 0.20 PROD1 DRILL WPRT P RBIH. SOW = 5 Klbs. 12,075.0 12,549.0 23:36 23:48 4/21/2017 4/22/2017 0.20 PROM DRILL DRLG P BOBD, 1.80 bpm, free spin diff 1075 12,549.0 12,560.0 23:48 00:00 psi, CT wt -7 k lbs, WOB 1.1k lbs, ROP 20-70 fph. Still having weight transfer issues. Page 14119 Report Printed: 5/312017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Sled Time End Time Dur(hr) Phase op code A naty coda Time P-T-X opmensw MIKE) End Depth(ftKin 4/22/2017 4/22/2017 0.30 PROD1 DRILL DRLG P Continue drilling lateral. 1.80 bpm, CT 12,560.0 12,571.0 00:00 00:18 wt -7 k lbs, WOB 1.1 k lbs, ROP 30 fph. Still having weight transfer issues. 4/22/2017 4/22/2017 0.40 PROD1 DRILL WPRT P PUH for BHA wiper. PUW = 63 Klbs. 12,571.0 12,120.0 00:18 00:42 Had to pull up to 12,120 ft before we could tum around. 4/22/2017 4/22/2017 0.30 PRODI DRILL WPRT P RBIH. SOW 7 Klbs. 12,120.0 12,571.0 00:42 01:00 4/22/2017 4/22/2017 0.70 PRODi DRILL DRLG P BOBD. 1.80 bpm, CT wt -8 k lbs, 12,571.0 12,605.0 01:00 01:42 WOB 0.6 k lbs, ROP 49 fph. Still having weight transfer issues. Start pumping 25 bbl, 1 ppb beaded pills followed by 25 bbls mud from the active. Made first two pills with new mud from storage. 4/22/2017 4/22/2017 0.30 PROD1 DRILL WPRT P PUH for BHAwiper. PUW = 63 Klbs. 12,605.0 12,120.0 01:42 02:00 Had to pull up to 12,120 ft before we could turn around. 4/22/2017 4/22/2017 0.20 PROD1 DRILL WPRT P RBIH. SOW 7 Klbs. 12,120.0 12,605.0 02:00 02:12 4/22/2017 4/22/2017 3.60 PROD1 DRILL DRLG P BOBO. 1.80 bpm, CT wt -8 k lbs, 12,605.0 12,711.0 02:12 05:48 WOB 1.1 k lbs, ROP 25-40 fph. Still having weight transfer issues. Continue pumping alternating 25 bbls beaded pills followed by 25 bbls mud from the active. Beaded pills being made from mud from the active. GR wrap at 12,630 ft. 4/22/2017 4/22/2017 0.50 PROD1 DRILL WPRT P Lost it, -10 CT Wt, PU 48k 12,711.0 11,720.0 05:48 06:18 4/22/2017 4/22/2017 0.70 PROD1 DRILL WPRT P RBIH. RBIH Wt 11,720.0 12,711.0 06:18 07:00 4/22/2017 4/22/2017 2.30 PROD1 DRILL DRLG P BOBD. 1.75 bpm, CT wt 2 to -2 k lbs, 12,711.0 12,773.0 07:00 09:18 WOB 1.1 k lbs, ROP 25-40 fph. Still having weight transfer issues. Pumping 10 bbl, 1 ppb beaded pills every 100 bbls. Good effect from the wiper that diminished with time on bottom. 4/22/2017 4/22/2017 0.50 PROD1 DRILL WPRT P Lost it, PU 50 k, tried to turn around, 12,773.0 11,615.0 09:18 09:48 no luck, PUH 4/22/2017 4/22/2017 0.50 PROD1 DRILL WPRT P RBIH. RBIH Wt5 to-3 k 11,615.0 12,773.0 09:48 10:18 4/22/2017 4/22/2017 3.20 PRODt DRILL DRLG P BOBD. 1.70 bpm, CT wt 3 to -5 k lbs, 12,773.0 12,844.0 10:18 13:30 WOB 1-0.2 k lbs, ROP 6 - 50 fph. Weight transfer issues. Pumping 10 bbl, 1 ppb beaded pills every 100 bbls. Good effect from the wiper that diminished with time on bottom. Pumped 10 x 10 low x high. 4/22/2017 4/22/2017 0.50 PROD1 DRILL WPRT P PU 50 k, let 10 x10 pill oout and 12,844.0 11,841.0 13:30 14:00 chashed up hole on wiper trip. 4/22/2017 4/22/2017 0.50 PROD1 DRILL WPRT P RBIH. RBIH Wt5 to -5 k Struggled to 11,841.0 12,844.0 14:00 14:30 RBIH. Had to cut pump rate to 0.7 bpm Page 15119 Report Printed: 5/312017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth start Too EM Time our (m) Phase op CMe Activity Coe® Time P-T-X Operation (ftKB) EM Depth MKB) 4/22/2017 4/22/2017 2.00 PRODt DRILL DRLG P BOBD. 1.70 bpm, CT wt 3 to -6 k lbs, 12,844.0 12,892.0 14:30 16:30 WOB 1-0.2 k lbs, ROP 20 - 50 fph. Weight transfer issues. Pumping 10 bbl, 1 ppb beaded pills approx every 100 bbls. 4/22/2017 4/22/2017 0.60 PROM DRILL WPRT P Lost it, PU 49 k, chase 10 12,892.0 11,615.0 16:30 17:06 4/22/2017 4/22/2017 0.50 PROM DRILL WPRT P RBIH. RBIH WtS to-3 k 11,615.0 12,892.0 17:06 17:36 4/22/2017 4/22/2017 1.00 PRODII DRILL DRLG P BOBD. 1.78 bpm, CT wt 3 to -8 k Ibs, 12,892.0 12,926.0 1736 18:36 WOB 1-0.2 k lbs, ROP 20 - 50 fph. Weight transfer issues. Pumping 10 bbl, 1 ppb beaded pills approx every 100 bbls. 4/22/2017 4/22/2017 0.30 PROD1 DRILL WPRT P PUH for short wiper. Unable to tum 12,926.0 12,430.0 18:36 18:54 around until 12,430 ft. PUW = 60 klbs. 4/22/2017 4122/2017 0.30 PROD1 DRILL WPRT P RBIH. SOW = 5 to -3 KIbs 12,430.0 12,926.0 18:54 19:12 4/22/2017 4/22/2017 1.90 PROD1 DRILL DRLG P BOBD. 1.79 bpm, CT wt 3 to -6 k lbs, 12,926.0 12,977.0 19:12 21:06 WOB 1-0.2 k lbs, ROP 20 - 50 fph. Weight transfer issues. Pump beaded pills as required. Start mud swap. 4/22/2017 4/22/2017 0.70 PROD1 DRILL WPRT P PUH for wiper trip. PUW = 55 KIbs. 12,977.0 11,600.0 21:06 21:48 Turned around at 12,390 ft. Could not get back to bottom. PUH to 11,600 ft. 4/22/2017 4/22/2017 0.60 PRODt DRILL WPRT P RBIH. SOW =5to-3 Klbs. 11,600.0 12,977.0 21:48 22:24 4/22/2017 4/23/2017 1.60 PROD1 DRILL DRLG P BOBD. New mud at the bit and 12,977.0 13,025.0 22:24 00:00 12,977ft. Significant reduction in pump pressure. 1.79 bpm, CT wt -7 k lbs, WOB 1.6 k lbs, ROP 40-20 fph. Weight transfer issues. Continue to mix and pump beaded pills. 4/2312017 4/23/2017 0.60 PROM DRILL DRLG P BOBD. New mud at the bit and 13,025.0 13,033.0 00:00 00:36 12,977ft. 1.79 bpm, CT wt -7 k lbs, WOB 1.6 k lbs, ROP 40-20 fph. Weight transfer issues. Continue to mix and pump beaded pills. 4/23/2017 4/23/2017 0.70 PRODt DRILL WPRT P PUH for wiper. PUW = 60 Klbs 13,033.0 11,600.0 00:36 01:18 4/23/2017 4/2312017 0.70 PRODI DRILL WPRT P RBIH. SOW = 5 -3 Klbs. 11,600.0 13,033.0 01:18 02:00 4/23/2017 4/23/2017 1.80 PROD1 DRILL DRLG P BOBD. 1.79 bpm, CT wt -9 k lbs, 13,033.0 13,080.0 02:00 03:48 WOB 1.6 k lbs, ROP 40 fph. Weight transfer issues. Continue to mix and pump beaded pills. 4123/2017 4/23/2017 0.50 PROD1 DRILL WPRT P PUH for wiper trip. PUW = 50 Klbs. 13,080.0 12,487.0 03:48 04:18 Could not tum around until 12,487 ft. 4/23/2017 4/23/2017 0.30 PROM DRILL WPRT P RBIH. SOW = 2 Klbs. 12,487.0 13,080.0 04:18 04:36 4/23/2017 4/23/2017 3.20 PROD? DRILL DRLG P BOBD. 1.81 bpm, CT wt -9 k lbs, 13,080.0 13,150.0 04:36 07:48 WOB 1.6 k lbs, ROP 10-60 fph. Weight transfer issues. Continue to mix and pump beaded pills. TD, allow WOB to drill off, reduce rate to get a survey. ***TD @ 07:48 R 13150' CTMD Page 16119 ReportPrinted: 51312017 a Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time Erb Time Our (hr) Phase Op Coda Apivdy C de Time P-T-X OpereWn (ftK6) Erb Depth (40) 4/23/2017 4/23/2017 1.80 PROD? DRILL WPRT P POOH, PU 45 k lbs. on swab wiper 13,150.0 9,925.0 07:48 09:36 trip as 10x10 sweep exits the bit, chase sweep up hole, swap off of High line power because of CPF2 electrical issue, roll tool face to LS 500' off bottom, continue to pull out of hole. saw motor work and slight bit overpull at 10,312, & 10,096'. Lots of beads and dirt back to the shaker with a small amount of what appears to be polly swell. 4/232017 4123/2017 1.60 PROM DRILL WPRT P Jog the build, RBIH 400'@ 507min to 9,925.0 9,925.0 09:36 11:12 EOB, POOH w TF oriented LS. Saw slight overpulls and motor work in the bottom of the build - 10,126, Stop @ 9931', RBIH to jog build one more time, turn around @ 10417, Slight WOB bobble @ 10094, no work, continue to POOH. 4/23/2017 4/23/2017 1.90 PRODi DRILL WPRT P Continue to POOH, to 200' RBIH to 9,925.0 78.0 11:12 13:06 500' jog, continue to POOH. A little bit of metal ribons, suspect billet in the returns not a huge amount of solids. Choke A starting to pack off. 4/23/2017 4/23/2017 2.00 PROD1 DRILL WPRT P Tag up. RBIH on Tie in TD 78.0 9,695.0 13:06 15:06 conformation, liner pill run. swapped from choke A to choke B. Choke B worse, swap back to A. 4/232017 4/23/2017 0.20 PROD1 DRILL DLOG P Tie into K1 for-7.0' correction 9,695.0 9,722.0 15:06. 15:18 4/23/2017 423/2017 0.20 PROD1 DRILL DLOG P Verify BHP, parked @ 9847 - 5951 9,722.0 9,847.0 15:18 15:30 TVD sensor, Pumped annular pressure to 3538 psi, observed pressure fall and trend lower to 3510 psi. 4/23/2017 423/2017 1.60 PRODI DRILL WPRT P Continue to RIH, window clean, billet 9,847.0 13,165.0 15:30 17:06 showed a little blip on the load cell, clean, conflnue to TD pumping 0.94 bpm and running 50 ft/min. started to s tacked weight at 12,528' bobbled through, reduced RIH speed to 42 Nmin and pump to 0.89 bpm. again at 12,629'reduced RIH speed to 35 fl/min, crosseed into negative surface weight @ 12,733'. RIH speed reduced to 24 ftimin. SD hard with WOB @ 1 k @ 13,112'. wiggled orienter and worked pipe to 13165'. 4/23/2017 4/23/2017 1.00 PROD1 DRILL WPRT P PU 48 k lbs, PUH, 0.5 fUmin while 13,150.0 13,162.0 17:06 18:06 displacing beaded liner running pill to bottom, tum around, RIH easily, CTY Wt 6 k. tag bottom @ 13162' 4/23/2017 4/232017 2.60 PROD1 DRILL DISP P POOH laying in 50 bbl beaded liner 13,162.0 129.0 18:06 20:42 running pill, followed by 11.4ppg NaBr completion fluid. Paint TD flag at 9778 ft and window flag at 6478 ft. 4/23/2017 4/232017 0.70 PROD1 DRILL OWFF P Flow check at surface. Static. 129.0 129.0 20:42 21:24 i Page 17119 Report Printed: 513/2017 I Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slan Depth Start Time Ertl Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (M13) EM Depm (WB) 4/23/2017 4/24/2017 2.60 PROD1 DRILL PULD P POOH. Bump up. LD BHA#11. Bit 129.0 0.0 21:24 00:00 graded 1-1. Overall the BHA was in good condition. Inspect flat spots on coil. Measured 0.06" WT with UT -8 feet above the CTC. Prepare to cut coil. 4/24/2017 4/24/2017 2.50 COMPZN CASING CTOP P Cut 20 ft off coiled tubing. Install CTC,. 0.0 0.0 00:00 02:30 Pull test CTC to 35KIbs. Rehead and test a -line. PT to 4200 psi. 4/24/2017 4/2412017 5.00 COMPZN CASING PUTB P PU liner completion. Non ported bull 0.0 3,277.0 02:30 07:30 nose, 71 jts 2-318" slotted liner, 14 joints 2-3/8" blank liner, 2 pups and a shorty deplyment sleeve. 4/24/2017 4/24/2017 1.50 COMPZN CASING PULD P Clear liner running equip from floor. 3,277.0 3,321.0 07:30 09:00 PJSM, PU BHA #12, inspect and replace pack offs, 4/24/2017 4/24/2017 1.00 COMPZN CASING RUNL P Bump up, set depth, RIH 3,321.0 9,851.0 09:00 10:00 4124/2017 4/24/2017 1.00 COMPZN CASING RUNL P Tie into Pipe flag, +18.5% note cut pipe 9,851.0 9,837.0 10:00 11:00 was 21.05' acclual correction -2.5'. PU Wt 48.5k, zeroed WOB, set for -10 k lbs, at the window. 4/24/2017 4/24/2017 4.90 COMPZN CASING RUNL P Continue to RIH, SO @ 10502, and 9,837.0 13,161.0 11:00 15:54 start stacking out. Work pipe to -10,800. Started pumping while RIH, initial gains that quickly diminished then returned. Suspect we were lifting diluted, tubed beaded liner running pill to surface. Worked way to bottom, sat down. Increased pump rate to 1.4 bpm, PU, saw break over at 42, WOB fell to -7 k. Reset depth. **TOL 9885' bottom of liner 13162.5' 4/24/2017 4/24/2017 0.20 COMPZN CASING TRIP P PUH, down on the pumps, open EDC, 13,161.0 9,621.0 15:54 16:06 4/24/2017 4/24/2017 020 COMPZN CASING DLOG P RIH, Tie into the K1 for+2 foot 9,621.0 9,676.0 16:06 16:18 correction. 4/24/2017 4/24/2017 0.50 COMPZN CASING DLOG P "'SBHP 9,621.0 9,676.0 16:18 16:48 Park @5740.9' Sub Sea, 5849.9' TVD, Shut down pumps and allow down hole pressure to stabilize at 3431 psi 4/24/2017 4124/2017 2.90 COMPZN CASING DISP P Pump interface spacer and seawater 9,676.0 2,500.0 16:48 19:42 to surface 4/24/2017 4/24/2017 1.60 COMPZN CASING DISP P Pump Diesel freeze protect from 2500 2,500.0 60.0 19:42 21:18 feet to surface. 4/24/2017 4/24/2017 1.20 COMPZN CASING PULD P Bump up, space out, PJSM, PUD BHA 60.0 0.0 21:18 22:30 #12 and LD same. MU Nozzle. 4/2412017 4/24/2017 0.50 DEMOB WHDBOP RURD P Jet stack 0.0 0.0 22:30 23:00 4/2412017 4/25/2017 1.00 DEMOB WHDBOP MPSP P PJSM, RU valve crew. PT lubricator. 0.0 0.0 23:00 00:00 Attempt to set BPV. Did not hold. Pull BPV, observed cut o -ring. 4125/2017 4/25/2017 1.50 DEMOB WHDBOP MPSP P Observed cut O-ring on BPV after it 0.0 0.0 00:00 01:30 wouldn't lest. PU back up BPV. Stab lubricator and pressure test. Run and set BPV. Good negative test. 650 psi surface pressure. Page 18119 Report Printed: 5/3/2017 Operations Summary (with Timelog Depths) 2Z-29 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log scan capon Start Time End Time Our (ht) Phase Op Code I Activity Code Time P -T -X Opemtmn (RKB) End Depth (flK8) 4/25/2017 4/25/2017 2.00 DEMOB WHDBOP RURD P Freeze protect tree. Blow down CT 0.0 0.0 01:30 03:30 and surface lines. Start rig move checklist. 4/25/2017 4/25/2017 2.50 DEMOB WHDBOP NUND P ND BOPE. Rig released at 06:00 0.0 0330 0600 Page 19119 ReportPrinted: 5/3/2017 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z -29L1 60-029-21881-60 Baker Hughes INTEQ Definitive Survey Report 02 May, 2017 Raw BAKER HUGHES HIM BAKER UGHES 70" 19 4 604 N 149. 45 40 513 W 0 00 ush Field Stnmath (nT) 57,537 Design Conocolahillips �- ConoCo011lllps Audit Notes: Definitive Survey Report Oompang C vocoPlhlhps (Alaska) Inc. -Kup2 Cool Coordinate Reference: Well 2Z-29 10 Propd: Kupsmk River Unit WD Referent¢: 2Z-29@109,000sft(2Z-29) SIM: Kupamk 2Z Pad MD Reference: 2Z-29®109.OUusg(2Z-29) Depth Fmm(TVD) Wil 2Z-29 Nodh Reference: This "Ibere: 2249 Survey Calculation Method: Minimum Curvature (inert) Design: 2Z-29 DaMEase: EDM Alaska NSK SandOox Project KupamkRNer Unit, NOM Slope Alaska, United States 109 00 0 00 0.00 Map System: US State Plane 1927 (Eaad solution) System Datum: Mean Sea Level Survey Pmgmm Geo Datum: NAD 1827 (NADOON CONUS) Using Well Refe eno Point Map Zone: Alaska Zone 04 Using geodetic scale factor To Well 2Z-29 Survey Well Position ♦N/5 000 usft Northing: 5,H65,918.38usfl (rift) Latitude: ♦EDW 000 ush Easling: 529,4STl5usft Sled Date Longitude: Position Uncertainty 000 Usti Wellhead Elevation: ..it M-29 (22-29) Ground Level: WelMare 2Z -29L1 1116=1 9,869.00 Magnetics Model Name Sample Data Declination Mp An9la MAD -Standards V) 411SQ017 r) BGGM2016 7/112017 17.52 MWD 8093 HIM BAKER UGHES 70" 19 4 604 N 149. 45 40 513 W 0 00 ush Field Stnmath (nT) 57,537 Design 2Z -29L1 Audit Notes: Verslon: 10 Phase: ACTUAL TM On Depth: 11,565.14 Wdital Section: Depth Fmm(TVD) ala$ ♦EFW DlfecNea lush) (inert) 0a11) r) 109 00 0 00 0.00 0.00 Survey Pmgmm Date 42412017 From To Survey Suraey ("aft) (rift) Suney(Wellame) Tool Name Description Sled Date End MM 20000 9,800.00 M-29 (22-29) BOSS YRO Sperry Ehm BOSS gym mUlhshot 1116=1 9,869.00 11.565.14 Y-29L1PB1(2Z-29L1PBi) MWD MAD -Standards 41108017 411SQ017 11,57500 13,119.n 2Z-291.1(22-291.1) MWD MWD - Slander! 4119QO17 4123/2017 5�0173:29:59PM Pegs2 COMPASS 50001 Bull 74 Survey Conocolthillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Nos") Inc. -Kup2 Local Coot6inete Reference: Well 2Z-29 pno'... Kuparuk River Unit WD Reference: 2Z-29@1ODSOuah(2Z-29) See: Kuprtuk 2Z Paid MD Reference: 2Z-29®10990uah(2Z-29) Wall, 2Z-29 North Reference: T.. W.11N : 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2239 Dao!,...: EDM Alaska NSK Sandbox Survey Annotation TIP KOP His BARER M86 522017 129 59P Page 3 COMPASS 0001 Build 74 Map Map Vertical MD Inc w M TMDSS Myo SFJ -W Northm9 Easiing OLS mdl0n lush) 1°) (°I lush) lush) (-am 1ush1 h) (ft) (•ILO') Survey Tool Name In) 11`8514 8103 35237 a93ZaT 5,823.67 3.91239 504944 5,96{023.01 534.51740 582 -3,912.79 MWD(2) 11,57500 8999 353.01 5932.87 5.82367 -3,90301 504819 5962,33 .59 534,518.11 6.50 -.903.01 AMID (3) 11,60530 N4 354.86 5,93141 5.822.41 -3,87222 5,044.99 5962.67.67 534,51279 18.91 -387.92 MD (3) 11.630.24 94.00 354.69 5,92.51 SM.51 -3,848.16 504272 5,952,00.42 534,510.43 3.16 -3.840.16 MWD(3) 11,0084 9347] 35880 592824 5,819.24 -3,817.57 5,04049 5,962,11869 534,s06.08 1283 3.81787 MWD(3) ANTIS 9343 0.91 5,927.85 5,818.85 -3.78065 5,an 78 5,682155.91 534,507.22 10.% -3,78065 MWDo) 11.731& W74 830 5,927.50 5,818.0 374667 594193 5,96{10989 5MSOS24 1597 -74567 MMi 11.]7011 037 971 5,927.13 5,818.13 3.]0.9.80 5,0038 5,9022220 53.51442 888 -3.70.80 MWD(3) 11,03240 89.0 14.12 aW.14 5.81814 -,67.30 5,05392 5.962.20.30 53.514.56 13.M -3,8]1.30 MWD(3) 11,8339 87.79 law 5.92].]8 5,81878 o'M 30 5061.12 5963 534,528.00 0.56 -3,6030 MJrD(3) 11,31.3 W.N 1354 5,9234 amm -.820.41 50098 5,962,31825 534.53579 059 3620.41 MJrD(3) 11,03.18 V27 1021 59:9.92 5.821.91 -.592.19 507491 5902,34448 53.54161 1197 359!.19 MMD(3) 119200 87.51 9.59 5,932.28 5.023.28 3562.77 5,MOO 5862,373.92 534.546.0 22 -3,582.]] MNA(3) 11,94850 0.0 4.0 5933.10 5.824.18 -,531.59 5,083.61 5962.40211 534,50.08 17.W 3.534.59 MJUD(3) 11,98079 87.11 262 5934.34 5,82 .31 3,50240 5,085 TO 5.962.40531 53.552.05 80 -3.37.40 MJA(3) 12,010.2 8711 359.05 593562 5.826.82 -3,47.84 5,085.13 5,902483. 76 534.552.36 120 -3,47.94 MJrD(3) 12,03532 8775 356.17 59:8.99 5,627.99 -3.416.96 5,0505 5,9132,4073 53.551.18 11.32 3iP16 WMA) (3) 120700 80.0 352.68 5.938.11 582.11 3,41278 5,081.71 5,982,6230 531.54771 10.40 -341270 MWO(3) 1210038 09.2 WAS 5.938 67 5,829.67 -3,3022 5,07909 5962.50.45 534,544.97 15.37 -3.38322 MIM) (3) 12,13010 88.25 057 5,939.31 5,83.31 -,353.44 507850 5862.581.23 534,54427 11.90 43044 MWD(3) 12,157,93 .an 373 5,940.22 5.0122 -3.32506 5,0]9.55 596{011.0 53.54520 11.3 -3,325.66 MWD(3) 12,161.3 88.40 704 5,94105 5,032.05 4.23.43 5.002.02 59820724 534,61.57 1264 320.43 MWO(3) 12213.19 6791 838 5.911.0 5032.90 327087 5,085.09 5552,83.01 53455132 495 -3,270.87 MIND (3) 12.245.45 3.15 11.55 5,9430 5,834.09 3,239.12 5,09146 5.50.89!.53 534,5[6]0 905 -3239 12 01WD(3) 1221822 111 14.10 5.94354 583451 A257.18 5,098.74 5962,72.55 SL,561.92 10.14 -20710 MWD(3) 12,31074 88.97 1527 5.N3,74 5BU75 395.96 5,107.00 5.952.700 5345786 13.42 3.175.96 Moil) (3) 12,335.16 91.49 19.3 5,94306 5,83400 3.15201 5,11568 5,952,783.94 53,50.65 767 3,152.81 MM (3) 12.3_6.3 0.31 1790 5943.68 5,831.0 3.1280 S12.73 5,952,07.81 53453.61 598 312.98 MM (3) 12,apt W 0.51 130 5943.72 aamn? 3408.59 5132.18 5,552.83.34 Walla 94 15.41 -,090.50 MM (3) 124210 90 06 1223 5,943.83 5834.03 3679.41 5.138.71 5,962.07.16 534863.35 334 1400.41 1414) (3) Annotation TIP KOP His BARER M86 522017 129 59P Page 3 COMPASS 0001 Build 74 ConocoPhillips ConocoPhillips Definitive Survey Report Company- ConowPh911ps(Alaska) Int-Kup2 Local Co-ordinate Reference: "I 2Z-29 circled Kupamk River Unit TVD Reference: 2Z-29@10900us8(2Z-29) Site: Kupamk 2Z Pad MD Resonance: 2Z-29 LB 109 o0us8 (2Z-29) Well 2Z-29 North Rehrence: Tina Wellbore: 2L29 Survey Calculation Method: Minimum CuNeW. Design: 2Z-29 Database: EDM Alaska NSK Sandbox Annotation RAW BAKER 5 Q0173. 29 59P Pape4 COMPASS 5000.1 Bu1M 74 Map Map Vertical MD Inc As, WD TVDSS eNl-9 SE.W handling Eaetln9 DL6 Section (oaf[) (1) V) loan) lush) Naft) (UM)( el 1KI (^1100') Survey Tool Name 12,998 67 0991 tt 81 5.99303 5,83483 -3,04215 5,t9i.51 5862,89x.]9 09,68005 tP -3.09,N 215 MRm(3) 12,400ID 90.37 13.25 5.94374 5.834.74 x,01226 5151.16 5,952,92456 534.815.57 491 -3,01226 MbD(3) 12,51042 a72 1723 5,94372 5,834.]2 29Ei.20 5,159.08 5962 ass 74 534.823.30 13.30 -2,98320 MN➢(3) 12,541.35 89.75 1012 5.99386 5,834.26 -2,953,73 5.10,47 5962,983 24 534,63265 2.88 -2,953.73 MNI)(3) 12,577.83 16.94 21.57 5,80396 5,834.26 4,91945 5,180,04 5.860,01757 534,644.89 9.46 -2.919.45 MND(3) 12,60027 0933 2217 5,94420 5,635.211 -2,898.80 5.109.21 5,9K1,030.45 534653.16 562 -2.890,60 MJi 1201.W an 28 2511 5,944.99 5,83599 -2,859.93 520115 5,961,067.16 534,6%.61 9.55 -280.93 M4A(3) 12.65563 L0.14 W21 5945.53 5,836.53 -2.840.35 5,21ZW 5,90,26 .79 534,678.13 9.43 -2,044135 M%VD(3) 12,85385 86.75 20.29 5.99581 5,836.81 -2,IU! 37 5225.50 590.113.81 534.609.17 440 2,823.37 MND(3) 12,71523 89.35 32.43 5.84605 5,83705 -2,798.30 524135 5480.190.84 04.704.91 1325 -2,726.80 MND(3) 1274519 80.12 2916 5,94471 5,837.71 2770,58 5,2:b,69 590,10,8 04,720.14 110 -2,"058 1061)(3) 12"507 87.39 27.42 5,94780 5.838.89 274429 5,270.04 5,90,191.06 04,734.19 8.31 -2,7H 29 MND(3) 12,80106 0.12 23.98 5.94090 5.839.90 -2,726.04 5,201.29 590.216.0 634.745.25 15.40 226004 "1)(3) 12,09..'6 633 2006 5,9soo3 5,84103 -2,694.0 5292.47 5.960,242.0 04,751 12.M -2,80459 INAD(3) 12,07.14 87.0 16.85 5.95120 5,84220 -2,661 5,39138 590.20.21 534.76431 11.70 3,668.0 MND(3) 12.0685 0.25 1453 5,95219 5,843.19 -2.640.15 5,30915 5,960.297.34 04,77209 ado -2,640.15 MND(3) 12.917,28 8582 12W 5,95379 5,844.79 -2,610,13 5.31639 5,960,327.38 534,77931 10.0 -2,610.13 MND(3) 12,946.23 86.04 10.0 590.64 5.846,84 -2,5810 5,3M 13 5,90,30.70 539.784.84 7.02 -2,5810 MND(3) 12,974.0 850 7.64 5.95791 5,048.91 -2,553.91 5.326.54 590,30.0 534.789.14 961 -2,0393 MND(3) 13,007.43 81.26 4.24 5.959.97 5,850.97 -2,0130 5,329.93 5,90,916.26 534.792.41 11.0 -2,0180 MND(3) 13,0906 87.05 30.85 5,95129 5,85229 4494.71 5,330.65 5,90,442.05 04,70.02 20 Z2 -2,494.71 MAID(3) 13,06538 0.22 1.48 5,90.13 5,854.13 -2,40.46 5330.74 5.80.47409 534,792.99 a -2,40.46 MWD(3) 13,601,30 876) 35667 5,954.51 5.85551 -2,4]69 5,330.32 S,Wb,49986 04.792.47 19.M -2.437.59 MND(3) 13,11972 87.0 1'4.0 595s.59 5,80.59 -2,429.10 5,328.14 5,953,520.26 534,75017 770 -2,46028 MND(3) 13.16200 6797 35450 5,967 re 5.85dw -2,367.22 5,32480 5.90,570.33 534.78596 000 -2,367.22 PROJECTED to TD Annotation RAW BAKER 5 Q0173. 29 59P Pape4 COMPASS 5000.1 Bu1M 74 ®.I ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z-29L1PB1 50-029-21881-70 Baker Hughes INTEQ Definitive Survey Report 02 May, 2017 IGkV BAKER HUGHES Conoci3 hilfips Company: ConomPhllllps hkaska) hid-Kup2 Project: Kupamk River Unit sim: Kupamk 2Z Pad Well: 2Z-29 Welibors: 2Z-29 Design: 2Z-29 Pmje& Kupawk River Unit, NOM Slope Alaska. United States Map system: US State Plane 1927 (Exact wlutbn) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: AMska Zone 04 ConoeoPhillips Definitive Survey Report Lowl Co-ordinate Reference: Viet 2Z-29 ND Reference: 22-29 Q 109.00usft (22-29) MD Remrence: 2Z-29 ®109 00usft (2Z-29) Norm Reference: T.. Surrey Cakulation Method: Minimum Curvature Database: EDM Alaska NSK Sandbox well 2Z-29 Phase: ACTUAL Me On Depth: 9,800.00 well Position +NIS 0.00 out NonM1ing: -0-W 000 usfl Easting: Position U ... nainey 000 usft Wellhead Elevation: Wellbore 2Z-29UP81 (aan) (1) Magnet.. Model Name Sample Date 9.69 BGGM2016 000 71112017 Design 2Z 29L1 PB1 Date 41242017 Audit Nates: From Mean Sea Level Using Wail Reference Point Using geadelie scale tactor 5.965,91638usft 52%453.15usft usfl Latitude: Longitude: Ground Level: D,Angle 1°I 8093 VAN 'NOWIES 70° 19' 4.634 N 149° 45'40 513 W 0 00 usfl Field Strength inn 57,537 Version: 10 Phase: ACTUAL Me On Depth: 9,800.00 Veniaal Section: Depth From (TVD) +NAS +EZVV Direction (eaDl (i (aan) (1) 109 00 9.69 0 O 000 survey Program Date 41242017 From To Survey Survey Itsft) (..ft) Sunni waftleee) Maul kmlna DeaoNption Sort Dam End Date 200.00 9,800.00 2Z-29 (2Z-29) BOSS -GYRO Sperry -Sun BOSS gym multishot 111612001 9,889.00 12,34009 2Z39L1 PSI(ZZ-29L1PB1) MWD MAD -Standard! 41IW2017 411812017 5 2017 3:2845PM Page 2 COMPASS 5000.1 WO 74 Survey Conocolahillips warks COnOCOPhillip5RAKM Definitive Survey Report HILIG E5 Company: ComeoPhillips(Alaska) Inc.-Kup2 Local COaMmilte Reference: Well 2Z-29 PmjeC: Kupamk Roar Unit WO Reference: 2Z-29 ®1N Nusn (2Z-29) WD Site: Kupamk 22 Pad MD Reference: 2Z29 @ 109.00us11(22-29) Naming Well: 2Z-29 North Reference: Tone Annotation Walloons: 2Z-29 Survey Calculation Memodu Minimum Curvature (us Oesi9n: 2Z-29 Dntaease: EDM Alaska NSK Sandbox Irtl Survey 312017 3:2645PM Pa9e3 COMPASS 50001 Suits 74 Vertical MD Inc Pal WD TVDSS +N13 +PJ -W Naming Eaaating OLS cd-- Survey Tool lame Annotation Pont)Pont)1°) 1(..it) (us (um) dint) luutl Irtl Btl nip' 1' ) Inl 9,887.00 52.48 13220 5,82191 5,81291 54,96781 5.194.82 5960,9%.52 534.8%.9f 3.33 1,%061 MJrD(2) TIP 9,610.00 In 48 13264 5,9]0.11 5,06].11 5.01523 5,206.0 5%U,922.11 sattin.20 0.39 -5,015.23 MJrD(2( KOP 9,9%.15 5].09 132.60 5,%].16 5,878.16 6.025.82 5,21840 5,9R0,911.5] SA4.69075 24.02 -5015.82 MAT)(2) 992.15 6].1] 132W 8,601.16 5892.16 5,047.75 5,237.93 596089331 534.]1031 3361 5,04375 fiend) (2) 993,0.65 TRW 13260 6,010.37 590137 5.061.00 s,2%.02 5987,83178 534.733.20 39.02 5,054.80 MAT) (2) 10,005.18 9138 132.01 601301 5,901.01 5,080.12 5.2%.O8 5%0,84954 534,750.62 33.40 3.088.12 MM(2) 10,03 1 local 12am awom 5,960.80 -5,101.70 6,308.00 5%0.829.% 534,]0142 33.87 -510T 70 MM (2) 10,065.10 101.59 116.73 6,003.26 5694.26 -5.123.06 5,332.00 5,9110813.99 574.80540 3563 5,12386 MWD(2) 10,005.17 105.13 108.41 6,S%.45 5087.45 -5,13509 5359.81 5960.80207 534.83253 39% j13509 M0ID(2) 10,125.24 104.05 %.56 5.%T.91 5.08.91 -5,1400 5,380.15 5am?mm 534.8009 41.07 5,140.0 MAID (2) 10.155.21 10554 01.% station 5,8712) -5,130.81 6.4170 5.860.79931 534,88980 38.71 6,130.87 boon) (2) 10,185.79 104.17 ISN 502.3] 5,863.37 -5,13164 5,44564 5.%0.887.65 534,91834 37.18 6,131.64 MWD(2) 10.21515 161.07 55]8 5,95520 5,85620 -5,11840 5.47140 5,x,819% 531,944.13 4620 6.11340 MWD(2) 10,245.43 10.34 4251 5,95813 5,84973 S,M61 5,49333 5,90,03197 534,965.90 43.58 -5.879.51 SAID (2) 10,2]85] 1031 2910 5,952.05 5.84305 5,04,91 5,511.11 5.%7,86.6 534,983.58 4191 -5,07491 MWD(2) lomo18 %0 22.50 5,94733 5,83033 6,04953 5.52338 S,KA,&87.05 534,995.75 mat -5,049.57 MWD(2) 10,335.61 0.89 12M 5.944.84 5,8%84 6,01.17 5,532.20 5,960,91745 535874.45 31.08 -5.01.17 MWD(2) 10360.2] 9141 W980 5943.89 5.83469 d,996.13 5,534.81 5.960,942 .0 5%.0.'697 48.50 -026.1] MWD(2) 10.31'196 %.(A 34563 5,94333 5.83433 -1,965.]] 5.530.95 5,9%,972.64 5%,87199 46.49 4,965.0 MW0(2) 10,41].70 9087 34390 5,943.00 5,834.00 AM 90 5,52393 5,amada.W 64875.07 650 4'aasm MWita) 10,446.20 IS 34097 5,94298 5,833.90 4,91261 5,515.33 5.%1,025.]3 534,987 16 11.61 4,912.61 MWD(2) 10,478.87 91& 33966 5,942.0 5,833.0 4,8003 5504.32 5.961056.46 534,9]6.03 085 4.Mm MWD(2) 10.5%31 will 33].]] 5,941.74 5.832.]4 4,85743 5,491.]3 5%1,081.0 SJ4,905.35 726 4.85].43 "D (2) 10,535.1 016 336.01 5,940.32 5,631.32 4.829.46 5,48380 5%1,108.% $74954.31 861 -0829M MWD(2) 10,570.12 a"% 372548 5.938.00 anted 4,750.55 !%7780 5%1,139.83 54,93927 1D87 4,798.55 MAD (2) 10,599.87 880 32.10 5,933.05 5,8'11.65 -0]8.59 5457.3] 5961,165.7.1 54,024.6£ 1583 4,]]2.59 MWD (2) lo,waso 89.56 32734 5839.40 5,83040 4,746.27 5.43].06 5,961,191 95 54,900.25 569 4,]48.0 MW!) (2) 10,87166 87.73 32591 5,940.40 5831.40 4,]2S 54'2012 596121787 534,89121 5.% 4.8055 MWD(2) 10,606 %.A 323.]5 5,941]9 5,842.79 4.656.93 540.48 5,01,241.14 574.8]448 8.17 4,69593 MWD(2) 10800 %.M 323]0 5.943.16 5.834.16 AEP751 5,385.58 5,98128547 534.856.48 4.20 468.54 MWD (2) 312017 3:2645PM Pa9e3 COMPASS 50001 Suits 74 ConocoPhillips who �, COnOCOi�lllfip5Definitive �Kj1YQj�$ Survey Report CompanY: ConocoPhllllps(Alaska) Inc.-Kup2 Local Coanlinate RNemnce: Welt 2Z-29 P.J.d: Kupamk Riven Unit WO RBfefenbe: 2249 Q 1 W.00usft(2L29) Site: Kuparvk 2Z Pad MO Reference: 2Z-29 Q 109.00usft(2Z-29) Wall: 2Z-29 NoRh Reference: TNe Wellbore: 2Z-29 Survey calwni.n Method: Minimum Curvature Design: 2Z-29 Database: EDM AIasks NSK Sandbox survey Map Map wmcal MO Inc Pal TVD TVD35 +WS 1u.W Nonhln9 Ea51in9 OLS 3amlyn SWveyiool Name Annotatim (UM) VI (1) (UM) (uslt) (.eft) (..ft) In) (ft) (-MOOT (m) 10.75126 W59 MI 39 5,944.05 5,835.05 <,64a.43 5,36].11 5961,21&Si 534037 92 7.81 1,648.43 MWD(2) 10,78043 8039 320.19 594.57 585.57 1,625.83 5W6 5,961,31203 534,819.40 AW 1,625.03 Mast) (2) 10,810.33 91.93 320.46 5,94.22 5635.22 1,(UV8U 5,329.60 5951,34.94 5 ,80-24 855 y602.84 MNO(2) 10,e1989 929 32068 5,943.14 5,834.14 1,583W 5.31082 5.961.35].]0 534,]8137 137 1,58000 MM(2) 1087401 9161 =12 5,94182 5,832.92 1,553.38 5261.55 5.981.3&.8 54,780.80 443 -0553.5 MM(2) 10,80012 9153 32326 5,941.16 5,832.18 1,532.60 5V373 5,81044.5 534,74.10 4.49 1,532.80 MV11)(2) 10,92980 9166 32533 5,940.33 5,831.33 1.54047 5.256.39 5.96148.@ 534,Tffi86 69 1,5[6.4] M Q) 10,5063 91.07 32]43 5,MW 5830.62 4.483.60 5,25.80 5,961,453. 74 53471080 7.32 1.483.68 M Q) 10,5053 9153 329.75 5.938 92 58892 -0,450.17 5,2245 5,961,4n)10 534,694.41 7.% 1.45817 M (2) 11,019.84 91.44 331.35 5,930.11 5,829.11 4.43110 5.296.43 5,51,580.51 534.679.41 531 -0431,78 M (2) 11,050 17 N55 3502 5,937.M 5828.59 1.404,96 5,1&528 5,961$32.27 534,696.16 624 1,44.96 M (2) 11079.76 049 33450 5,937.31 5,88.31 1.37843 alum 5,801$59.75 534,1151.97 501 4.37043 MW (2) 11, 114.W 91.80 Was 5,95.69 5.82769 1,347 06 5,1Le.29 5,961,59006 53463794 976 1,317,W ~(2) 11,140.22 91.4 33920 6,935 97 5826 97 4.32276 5,159.96 5,01,814 32 534,8824 5.89 4,=76 1140FICI(2) 11,169.92 93.22 MO 73 5.935 51 5,88.51 1,2486 5.148.51 5,51,&2.17 534,61796 680 424.5 MIND (2) 118316 9].5 34307 5,Ris.S 5885 1,265.12 5.139.11 5,961,670.07 534,1109.45 7.83 -0,263.12 MAD(2) 11,82.79 89.80 34400 5,M',e 5,88.45 1,23483 5.18.07 5961,714! 12 5 saa08 591 1,23483 MJMO(2) 4.259.84 89.14 3427 5.95.92 S,B892 1,219.82 5,12247 5,96178.11 534,59159 1.5 1,24882 MWD(2) 11,289.74 89.54 M415 5,95.8 5.8278 -01W.05 5,114.34 5,961,756 84 W4,583.M 140 1.10005 MND(2) 11,32516 W28 24416 5,95.32 5,BP.32 1.145.97 514.8/ 5.961750.07 534573.54 280 4.14597 M (2) 11,5216 M97 342.73 5,95.28 50278 4.1849 5,096.97 5,961016.72 534,565.74 5.42 1,1809 MW (2) 115320 9109 344.58 5,935.98 58898 1.050.31 5.099.24 5.961.8,16 47 534,55.89 8.96 1,090.31 M (2) 11.410111 9280 314.55 5.95.96 50806 4.(HAU 5,08107 5951.8M 41 544549.62 6.5 1.064.34 M (2) 114649 9184 445.5 5.933.56 5824.55 4.M24 5,071.83 5,961907.47 534.510.24 44 1,02924 MW)(2) 11.47342 90.63 347.17 5,932.92 5,8892 10805 506567 5.981.933.63 534.533.09 6.17 1,003.05 MJrD(2) 1150396 W.? 34937 5,41282 5,8862 -3,9711.51 5056.62 596l,M 14 5345Z1.OB 684 -3,97051 M (2) 11,53457 8078 350.61 5,932.62 5,8862 3,943.4 5053.97 5.961.993.80 53452205 4.71 -3,4303 MJMD(2) 11,56514 9393 352.37 5,932.67 5.8867 -3.91279 6.049.44 5,56208.81 534,51740 5.02 -3,91279 MWD(2) 1159484 W91 34.31 5,93289 5.0869 3.88.30 5,46.44 5,962053.29 534513.4 8.54 -3,883.30 MJMD12) 11.62528 9101 354.95 5,932.4 5823.4 -.05299 5.4315 5.962=50 53451080 418 -3,85299 MMD(2) 11,66050 9133 354.29 5931 75 5822.75 381793 503985 5962,116.63 53450744 197 -381793 MUCI(2) Y 0173:28,45PM Page4 COMPASS 50001 Bu✓d 74 ConocoPhillips //aI ConocoPhillip5Definitive Survey Report HUGHES Campal4c ConocoPhillips(Maska) Inc,-Kup2 Local Co,onloate Reference: VVe112Z-29 P.J.= Kuparuk River Unit ND Reference: 2Z-29 Q IM 00usn (2Z-29) site: Kupamk 2Z Pad MD Renemn<e: 2Z.29®109.00uffi(2Z-29) Well: 2Z-29 North Reference: True Wellbore: 2Zd9 Survey Calculatlon Method Minimum Curvature Design: 22-29 Database: EDM Alaska NSK SanCbox survey Map Map Vemcal MD 1. nal TV D TVD55 aN-N/-SeV.W Northing Ea4 OLS1ng Settion Survey That Nama Mnota000 f Marry 1°1 11 (uen) luxt) (oan) loan! Ittl Ittl Plod) Inl j 11,690.18 0. Z2 353.88 $,93130 5022.38 a'TWA2 5.035.]4 6,962,14812 534,501.21 3.90 -3,]80.42 ..D (2) 1 11,71998 9.60 35279 5,931.15 5022.15 -3,]50.83 5,033.23 5,98{1]].]0 et"Wo.59 332 -3,]59.83 MAO(2) 1t 11,]SGe3 wife 35311 5,93141 5821.41 -3.M 26 5020.]1 5,952214 .25 W495.92 574 3,7M.W MWD (2) 11,]06]3 a 0 %440 5,932.02 5.823.02 -3,692.54 5.0545 5.962.243.9 5X491.55 4.85 3,M," MM (2) 11,81905 111 355.59 5.932.72 5023.72 -3,660.35 5,02283 5.96.1.2]612 5X•4981 4.19 3,660,36 MWD(2) 11,85021 88.19 35867 "nfP1 5024.64 -3,82938 5.020n 5,96230].10 63448.30 355 -309.28 Novo (2) 11,8&5.22 0902 351161 SW'W 5025.60 -3,594.31 5.01909 5.98134214 534,460.01 &03 -3.594.31 MIND (2) 11.915.19 80.55 35928 5935.13 5,028.13 -3,584.35 5,010.54 5,%2,372.W 583.485.14 273 3564,38 MWD(2) ' 11,945.12 88.05 35962 5,936,02 502].02 -3.534.44 501&25 5.M,402 .W 534.48473 202 J!tal.44 MWD(2) 11,88.02 89.40 1.32 5,93]04 5020.04 -3,501.55 5,010.52 5.96243400 5X.48.8 &27 3,601.56 MWD(2) 12605.50 W,02 312 593766 5,020.88 -3,474.11 5.019.% 5,981,462.34 5344&5.03 6,93 347411 MAT) (2) E IZOMX 88.28 3.16 5,93036 5,BD.38 -3,M4.42 5.02121 5,960,492.60 53448.34 249 -3444.42 MWD (2) 12,0wn M13 4.05 5,939.30 5,030.30 -3.41447 5021.31 5,95252190 53(48932 568 3,41447 MWD(2) 1209521 0]60 605 5940.41 5,0141 -3,304.70 S,OX 16 5.951,551 .3 53449205 447 3304]0 MWD(2) 12125.21 8745 78 5,941]1 5.832.]1 -3,3`v1.93 &029.]5 5.962,50184 511,495.52 &32 x354.93 BIWD(2) 12,155.62 8.20 8.84 5.943.13 5,834,13 -3,324.08 5.0&.11 5.9626110 Z4499 77 393 -3,324e8 MWD(2) 12,183.38 8.70 9.95 5.98 .30 5,835.38 -3,297.13 5.038.70 5.M.639.37 534504.25 432 -32!!.13 "D (2) 12,21760 87W 1352 5,94518 5,038.78 -3.28385 5,M5.61 &881,82.8 53451101 1049 326385 MWO(2) i 12247.06 05.]0 14.W 5,94749 5.&38.49 -3,235,52 &1152.88 5.962,701.W 514,517.9 7.31 -3,235.52 BIWO(2) 12215.18 8745 10.60 5.949.17 5.040.1] -3,20857 5060.58 5.962,72860 534.525.75 14.14 3,208.8 MIM)(2) 12,310.40 05.89 1947 5.951" 5,042.22 -3,17535 581.89 5.962,]613] 534538.95 &M 3,176,n MM (2) 12UDM 9,18 22.98 5.952.26 583.26 -3,14708 5082.03 5.92.76050 5&,547.78 18.34 -3,14708 MWD(2) 12399.00 90.18 22.99 5,952.60 5,83.06 3,09340 5,160.59 5.962 U3 534,570.33 OW -3603.40 PROJECTED to TO Y1 017 3:26:45PM Pepe 5 COMP SS 6000.1 Suit 74 RECEIAL) ` MIG BAKER MAY 2 3 2017 PRINT DISTRIBUTION LIST HUGHES COMPANY °-a6o li QAlaska, Inc. WELL NAME 2Z -29L1 FIELD Kuparuk River Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(@bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 901 PERSON ATTENTION N] L a 7045 28 22 7 se sign and return one copy of this transmittal form to: xoPhillips Alaska, Inc. Osterkamp DATA LOGGED 5/31/2017 G Street. P,I. K. BENDER lorafe, Alaska 99510 LOG TYPE GR -1 LOG DATE April 23, 2017 TODAYS DATE May 19, 2017 Revision No Details: Requested by: V V V 1 BP North Slope 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Burka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocePhillips Alaska Inc. 0 0 0 Attn: Ricky F,Igaricio ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska 0 CD 0 CD 1FIELDFINAL LOGS LOGS (digitalfimage) Surveys (Finalsurve ) #OFPR INTS # OF PKIN I S # OF COPIES # OF COPIES # OF COPIE 1 V V V 1 BP North Slope 0 0 0 EOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Burka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocePhillips Alaska Inc. 0 0 0 Attn: Ricky F,Igaricio ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska 0 0 0 Atm: Lynda M. Vaskell and/or Leonardo Elias 3201 C Street, Suite 505 'Anchorage, AK 99503 4 State of Alaska - AOGCC 1 1 1 Atm: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** 0 1 1 Atm: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 2 3 3 0 0 TOTALS FOR ALL PAGES: 0 2 3 3 0 0 RECEIVED 2 1 7 0 45 MAY 2 3 2017 28 22 7 ConocoPhillips AOC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z -29L1 50-029-21881-60 Baker Hughes INTEQ F/%v BAKER Definitive Survey Report HUGHES 02 May, 2017 ConocoPhillips KFIN y ConocoPhillips Definitive Survey Report KER HU04 ES Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 g 109.00usft (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (27-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 2Z-29 Well Position -NIS 0.00 usft Northing: 5,965,916.38 usft Latitude: 70° 19'4.634 N +E/-W 0.00 usft Easting: 529,453.15usft Longitude: 149' 45'40.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 2Z-2911 Magnetics Model Name Semple Dab Declination Dip Angle Field Strength P) PI inn BGGM2016 7/1/2017 17.52 80.93 57,537 Design 2Z-2911 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 11.565.14 Vertical Section: Depth From (TVD) +NI-S +EJ-W Direction (usft) (usft) (usft) (I 109.00 0.00 0.00 a0 Survey Program Date 4/24/2017 From To Survey Survey (uaft) (wtt) Survey (Wellbore) Toot Name Description Start Dab End Dab 200.00 9,800.00 2Z-29 (2Z-29) BOSS-GYRO Sperry-Sun BOSS gyro multishot 1/16/2001 9,889.00 11,565.14 2Z-29L1PBi (2Z-29L1PBI) MWD MWD- Standard 4/10/2017 4/16/2017 11,575.00 13,119.72 2Z-29L1 (2Z-291-1) MWD MWD- Standard 4/19/2017 4/23/2017 5/2/2017 3:29:69PM Page 2 COMPASS 5000.1 Build 74 11 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 @ I09.00usft (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (2Z-29) Well: 2Z-29 North Reference: True Wellborn: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Survey Annotation TIP KOP ASS BAKER HUGHES 5.2/2077 3.29:59PM Page 3 COMPASS 5000 1 Build 74 Map Map vertical MD Inc TVD TVDSS +NI -S ♦ Northing Easting OLS Section Survey Tool Name (usft) (°) (°) (1 (uaR) (usR) (uaR) ft) ("ll (ft) (ft) (>/1g0•) (ft) 11,565.14 90.03 352.37 5,932.67 5,82367 -3,912.79 5,049.44 5,962,023.81 534,517.40 5.82 3912.79 MM (2) 11,575.00 89.99 353.01 5,932.67 5,823.67 3,903.01 5,048.19 5,962.033.59 534,516.11 6.50 3,903.01 MM (3) 11,605.30 94.77 354.86 5,931.41 5,822.41 3,872.92 5,044.99 5,962,063.67 534,512.79 16.91 41,872.92 MM (3) 11,630.24 94.00 354.69 5,929.51 5,820.51 -3,848.16 5,042.72 5,962,088.42 534,510.43 3.16 3,848.16 MM (3) 11,660.64 90.77 356.88 5,928.24 5,819.24 -3,817.87 5,040.49 5,962,118.69 534,508.08 12.83 3,817.87 MWD (3) 11,697.88 90.43 0.91 5,927.85 5,816.85 -3,780.65 5.039.78 5,962,155.91 534,507.22 10.86 3,780.65 MWD (3) 11,731.94 90.74 6.34 5,927.50 5,818.50 -3,746.67 5,041.93 5,962,189.89 534,509.24 15,97 3,746.67 MWD (3) 11,770.11 90.37 9.71 5,927.13 5,818.13 -3,708.88 5,047.26 5,962,227.70 534,514.42 8.88 3,708.88 MWD (3) 11,802.40 89.60 14.12 5,927.14 5,818.14 3,67230 5,053.92 5,962,259.30 534,520.96 13.86 3,677.30 MWD (3) 11,830.27 87.79 15.84 5,927.78 5,818.78 -3,650.38 5,061.12 5,962,286.24 534,528.05 8.96 -3,650.38 MWD 13) 11,661.30 86.44 13.54 5,929.34 5,820.34 3,620.41 5,068.98 5,962,316.25 534,535.79 8.59 -3,620.41 MWD (3) 11 890.18 87.27 10.21 5,930.92 5.821.92 3,592.19 5,074.91 5,962,344.48 534,541.61 11.87 3,592.19 MWD (3) 11,920.08 87.54 9.59 5,932.28 5,823.28 3,562.77 5,080.05 5,962,373.92 534,54,63 2.26 3,562.77 MWD (3) 11,948.50 88.80 4.82 5,933.18 5,824.18 3,534.59 5083.61 5,962,402.11 534,550.08 17.35 3,534.59 MM (3) 11,980.79 87.11 2.62 5,934.34 5,825.34 3,502.40 5,085.70 5,962,434.31 534,552.05 8.59 3.502.40 MM (3) 12,010.29 87.11 359.05 5,935.82 5826.82 -3,472.94 5,086.13 5,962,463.76 534.552.36 12.09 3,472.94 MWD (3) 12,036.32 87.75 356.17 5,936.99 5,82299 -3,416.96 5,085.05 5,962,489.73 534,551.18 11.32 3,446,96 MWD (3) 12,070.69 88.53 352.68 5,938.11 5,829.11 -3,412.78 5,081.71 5,962,523.90 534,547.71 10.40 3,412.78 MWD (3) 12,10,38 89.29 357.18 5,938.67 5,829.67 -3,383.22 5,079.09 5,962,553.45 534,544,97 15.37 3,383.22 MWD(3) 12,130.18 88.25 0.57 5,939.31 5,830.31 3,353.44 5,078.50 5.962.583.23 534,544.27 11.90 3,353.44 MWD (3) 12,157.99 88.00 3.73 5,940.22 5,831.22 3,325.66 5,079.55 5,962,61700 534,545.20 11.39 3,325.66 MWD (3) 12,184.36 88.40 7.04 5,941.05 5,832.05 3,299.43 5,082.02 5,962,637.24 534,547.57 12.64 3,299.43 MWD (3) 12,213.19 87.91 8.38 5,941.98 5,832.98 3,270.87 5,085.89 5,962.665.81 534,551.32 4.95 -3,270.87 MWD (3) 12,245.45 88.15 11.55 5,943.09 5,834.09 3,239.12 5091.46 5,962,697.58 534,556.78 9.85 3,239.12 MM (3) 12,278.22 90.28 14.10 5,lul&5 5,839.54 3,207.18 5,098.74 5,962,729.55 534,563.92 10.14 3,207.18 MM (3) 12,310.74 88.99 18.27 5,943.74 5,834.75 3.175.96 5,107.80 5,962,760.80 534,572.86 13.42 41,175.96 MWD (3) 12,335.16 90.49 19.39 5,943.86 5,834.86 3,152.84 5,115.68 5,962,783.94 534.580.65 7.67 3,152.84 MWD (3) 12,360.35 90.31 17.90 5,943.68 5,BMA8 -3,128.98 5.123.73 5,962,807.84 534,SBB.61 5.96 3,128.98 MM (3) 12,391.98 89.54 13.08 5,943.72 5,83472 -3,098.50 5,132.18 5,962,838.34 534,596.94 15.43 3,098.50 MWD(3) 12,421.80 90.06 1223 5,943.83 5,834.83 -3,069.41 5,138.71 5,962,867.46 534,603.35 3.34 -3,069.41 MWD (3) Annotation TIP KOP ASS BAKER HUGHES 5.2/2077 3.29:59PM Page 3 COMPASS 5000 1 Build 74 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 g 109.00usft (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (2Z-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Survey Annotation /Gid BAKER HUGHES 572/2017 3:29: 59PM Page 4 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc AdTVD TVDSS *NIS *E/ -W Northing Easting DLS Section Survey Tool Name (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (-/100-) (ft) 12,449.67 Saw 11.81 5,943.83 5,834.83 41,042.15 5,144.51 5.962894.74 534,609.05 1.57 3,042.15 MWD (3) 12,480.29 90.37 13.25 5,943]4 5 M.74 3,012.26 5,151.16 5,962,924.65 534.615.57 4.91 -3,012.26 MWD (3) 12,510.42 89.72 17.23 5,943.72 5,834,72 -2,983.20 5,159.08 5,962,953.74 534.623.38 13.38 -2,983.20 MWD (3) 12,541.35 89.75 18.12 5,943.86 5,83486 -2,95333 5,168.47 5.962,983.24 534,632.65 2.88 -2,953.73 MWD (3) 12,577.80 89.94 2157 5,943.96 ; 5.834.96 -2,919.45 5,180.84 5,963,017.57 534,649.89 9.48 -2919.45 MWD (3) 12,600.27 88.83 22.17 5,944.20 5,835.20 -2,898.60 5,189.21 5,963,038.45 534,653.18 5.62 -2,898.60 MWD (3) 12,63157 88.28 25.11 5.944.99 5,835.99 -2,869.93 5.201.75 5,963,067.16 534.665.61 9.55 -2,859.93 MWD (3) 12,655.63 89.14 27.21 5,945.53 5,836.53 -2.848.35 5,212.36 5,963,088.79 534,676.13 9.43 -2,848.35 MWD (3) 12,683.85 89.75 28.29 5,945.81 5,835.81 -2,823.37 5,225.50 5,953,113.81 534,689.17 4.40 -2,823.37 MWD (3) 12.715.23 89.35 32.43 5,946.05 5,837.05 -2,796.30 5,241.35 5,963,140.94 534.704.91 13.25 -2,796.30 MWD (3) 12,745.19 88.12 29.16 5,946.71 5,837.71 -2,770.58 5,256.69 5,963,166.72 534720.14 11.66 -2,770.58 MWD (3) 12,775.07 87.39 2742 5,947,88 5,838.89 -2,744.29 5,270.84 5,963,193.06 534734.19 6.31 -2,744.29 MWD (3) 12801.06 88.12 23.46 5,948.90 5,839.90 -2,720.84 5.281.99 5,963,21655 534745.25 15.48 -2,720.84 MWD (3) 12,829.36 87.33 20.06 5,950.03 5,841.03 -2,694.58 5,292.47 5,963,242.85 534755.63 12.32 -2,694.58 MWD (3) 12,857.14 87.85 16.85 5,951.20 5,842.20 -2,668.26 5,301.26 5,963,269.20 534.764.31 11.70 -2,668.26 MM (3) 12,886.36 88.25 14.53 5,952.19 5,843.19 -2,640.15 5,309.15 5,963,297.34 534,772.09 8.05 -2,640.15 MWD (3) 12,917.28 85.82 12.59 5,953.79 5,841.79 -2.610.13 5,316.39 5,963,327.38 534779.21 10.05 -2,610.13 MWD (3) 12.946.23 86.04 10.33 5,955.84 5,846.84 -2581.83 5,322.13 5,963,355.70 534,784.84 7.82 -2,581.83 MWD (3) 12,974.56 85.58 7.64 5,957.91 5,848.91 -2.553.93 5,326.54 5,963,383.62 534,789.14 9.61 -2,553.93 MWD (3) 13,007.43 87.26 4.24 5,959.97 5,850.97 -2,52130 5,329.93 5,963,416.26 534,792.41 11.52 -2,521.30 MWD (3) 13,034.08 87.05 358.85 5,961.29 5.852.29 -2,494.71 5,330.65 5,953,442.85 534,793.02 20.22 -2,494.71 MWD (3) 13,065.38 86.22 1.48 5,963.13 5,854.13 -2,463.46 5,330.74 5,963,474.09 534,792.99 8.80 -2463.46 MND (3) 13,091.30 87.67 356.67 5,964.51 5,855.51 -2,437.59 5,330.32 5,963,499.96 534.792.47 19.36 -2,437.59 MWD (3) 13,119.72 87.97 354.50 5,965.59 5856.59 -2,409.28 5,328.14 5,963,528,26 534.790.17 7.70 -2,409.28 MWD (3) 13,162.00 87.97 354.50 5,96209 5858.09 -2,367.22 5,324.09 5,963570.30 534,785.95 0.00 -2,367.22 PROJECTED to TD Annotation /Gid BAKER HUGHES 572/2017 3:29: 59PM Page 4 COMPASS 5000.1 Build 74 ri.a BAKER HUGHES RECEWD MAY 2 3 2017 PRINT DISTRIBUTION LIST COMPANY AgoPbilllps 7Claska, Inc. WELL NAME 2Z-29L1PB1 FIELD Kuparuk River Unit COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(ftakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 1301* PERSON ATTENTION 9 21 7045 28228 Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp DATA LOGGED 700 G Street. 6 /31/2011 M.K.BENDER Anchorage, Alaska 99510 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE April 23, 2017 TODAYS DATE May 19, 2017 Revision No Details: Requested by: FIELDFINAL I 0 CID 1 0 I I I CID LOGS LOGS (digital/image) SurveysFinal Surveys) [OF # OF PRINTS # Uh PKIN 1 S # OF COPIES # OF COPIES COPIE 1 BP North Slope I 0 I 0 1 0 I I I LOA, PBOC, PRB-20 (Office 109) D&C Wells Project Aids Agatha Burka & Barbara Glassmaker 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaskalnc. 0 0 0 Atm: Ricky Elgaricio ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska 0 0 0 Atm: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State ofAlaska -AOGCC 1 1 1 Atm: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501�i 5 DNR -Division of Oil&Gas *** 0 i Ann: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 L** Stamp 'confidential" on all material deliver to DNR J 6 OP Exploration (Alaska) Inc. 'I 1 Petrotechnical Data Center, 1.112-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 2 3 3 0 0 TOTALS FOR ALL PAGES: 0 2 3 3 0 0 10-11 ConocoPhillips RECEIVED MAY 2 3 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z-29L1PB1 50-029-21881-70 Baker Hughes INTEQ Definitive Survey Report 02 May, 2017 L 1 IU49 28228 WEAI BAKER HUGHES 5/2/2017 3,28..45PM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips NFig ConocoPhillips Report BAKEIR HUGHES Definitive Survey Company: ConowPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 @ 109.00usit (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (ZZ-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 2Z-29 Well Position -N/-S 0.00 usft Northing: 5,965,916.38usft Latitude: 70' 19'4.634 N +E/-W 0.00 usft Easting: 529,453.15usft Longitude: 149° 45'40.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 2Z-29L1PB1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength P) (°) (nT) BGGM2016 7/1/2017 17.52 80.93 57,537 Design 2Z-29L1PB1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9.800.00 Vertical Section: Depth From (TVD) -NIS +E/-W Direction (usft) (usft) (usft) (°) 109.00 0.00 0.00 0.00 Survey Program Date 4/24/2017 From To Survey Survey (usft) (usft) Surrey (Wellbore) Tool Name Description Start Date End Date 200.00 9,800.00 2Z-29 (2Z-29) BOSS-GYRO Sperry-Sun BOSS gyro multishot 1/16/2001 9,889.00 12,340.69 ZZ-29LIPBI(2Z-29L1PB1) MWD MWD- Standard 4/10/2017 4/16/2017 5/2/2017 3,28..45PM Page 2 COMPASS 5000.1 Build 74 1w, ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 2Z-29 Project: Kuparuk River Unit ND Reference: 2Z-29 @ 109.00usft (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (2Z-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Survey 5/2/2017 3: 28:45PM Page 3 nits BAKER HUGHES Annotation TIP KOP COMPASS 5000.1 Build 74 Map Vertical MD Inc Azi ND NDSS -NI-S -E/-W W Northing Eating DLS Section Survey Tool Name (usft) (°) (°) (usft) (usft) (usft) (usft) (•1100') 9,800.00 52.48 132.20 5.921.91 5,812.91 3,967.61 5,154.82 5,960,%9.52 534,626.91 3.33 3,%7.61 MWD (2) 9,889.00 52.48 132.64 5,976.11 5,867.11 5,015.23 5,206.93 5,960,922.11 534,679.20 0.39 5015.23 MM (2) 9,908.15 57.08 132.60 5,987.16 5,878.16 -5,025.82 5,218.44 5,960,911.57 534,690.75 24.02 5,025.82 MWD (2) 9,938.15 67.17 132.60 6,001.16 5,892.16 -5,093.75 5,23793 5,960,893,72 534,710.31 33.63 5.043.75 MM (2) 9.970.65 79.85 132.60 6,010.37 5,901.37 -5,064.80 5,260.82 5,%0,872.76 534,733.28 39.02 -5,064.80 MM (2) 10,005.18 91.38 132.84 6,013.01 5,904.01 -5,088.12 5,286.08 5,960,849.54 534,758.62 33.40 5,088.12 MM (2) 10.035.44 10081 128.85 6,009.80 5,900.80 -5,107.78 5.308.80 5,960,829.98 539,781.42 33.80 5,107.78 MWD (2) 10,065.10 104.59 118.73 6,003.26 5,894.26 -5,123.86 5,332.80 5,960,813.99 534,805.48 35.63 -5,123.803 MWD (2) 10,095.43 105.13 106.41 5,995.45 5,886.45 -5,135.09 5,359.81 5,960,802.87 534,832.53 39.30 5,135.09 MM (2) 10,125.24 104.05 93.56 5987.91 5,878.91 5,140.07 5,388.15 5,960,798.00 534,860.89 41.87 -5,140.07 MWD (2) 10,155.23 105.54 81.65 5,980.23 5,871.23 -5,138.87 5,417.07 5,960,799.31 534,889.80 38.71 -5,138.87 MVVD(2) 10,185.79 104.17 69.98 5,972.37 5,863.37 5,131.64 5,445.64 5,960,806.65 534,918.34 37.18 -5,131.64 MIND (2) 10,215.75 103.07 55.78 5,965.28 5,855.28 5,118.40 5,471.48 5,960,819.99 534,944.13 46.20 5,118.40 MWD (2) 10,245.43 102.34 42.54 5,958.73 5,84913 -5,099.51 5,493.33 5,960,838.97 534,965.90 43.58 5,099.51 MWD (2) 10,276.57 102.31 29.18 5,952.05 5,843.05 5,074.91 5,511.11 5,960,863.63 534,983.58 41.91 5,074.91 MWD (2) 10,305.18 96.67 22.50 5,947.33 5,838.33 -5,049.53 5,523.38 5,960,889.05 534,995.75 30.31 5049.53 MWD (2) 10,335.03 92.89 12.06 5,944.84 5,835.84 5,021.17 5,532.20 5,960,917.45 535,004.45 3708 41021.17 MM (2) 10,360.27 91.41 359.88 5,943.89 5,834.89 3,996A3 5,534.81 5,960,942.49 535,006.97 48.58 4,996.13 MWD (2) 10,390.96 90.64 345.63 5.943.33 5,834.33 3,965.77 5,530.95 5,960,972.84 535.002.99 46.49 4.965.77 MWD (2) 10,417.70 90.80 343.90 5,943.00 5.834.00 4.939.98 5,523.93 5,%0,998.60 534,995.87 6.50 4.939.98 MWD (2) 10,446.20 89.26 390.97 5,942.98 5,833.98 41,912.81 5,515.33 5,961,025.73 534,987.16 11.61 4.912.81 MWD (2) 10,478.89 91.84 339.66 5,942.67 5,833.67 4,882.03 5,504.32 5,951,056.46 534,976.03 8.85 4.882.03 MM (2) 10,505.31 92.18 337.77 5,941.74 5,832.74 -0,857.43 5,494.73 5,%1,081.02 534,965.35 7.26 3.857.43 MWD (2) 10,535.76 93.16 336.01 5,940.32 5,831.32 3,829.46 5,482.80 5,961,108.95 534,954,31 6.61 4829.46 MWD (2) 10,570.12 91.93 332.48 5.938.80 5,829.80 3,798.55 5,467.88 5,961.139.80 534,939.27 10.87 3,798.55 MWD (2) 10,599.87 88.65 329.10 5,936.65 5,829.65 4,772.59 5,453.37 5,961,165.70 534.924.66 15.83 4,772.59 MWD (2) 10,630.84 88.56 327.34 5,939.40 5,830.40 3,746.27 5,437.06 5,961,191.95 534,908.25 5.69 4,746.27 MIND (2) 10,661 66 87.73 325.91 5,940.40 5,831.40 3,720.55 5,420.12 5,%1,217.60 534,891.21 5.36 3,720.55 MM (2) 10,690.58 85.77 323.75 5,941.79 5,832.79 3.696.93 5,403.48 5,961,241.14 534,874.48 8.17 3,6%.93 MWD (2) 10,720.87 88.04 323.70 5,943.16 5,839.16 3,672.54 5,385.58 5,961,265.47 534,856.48 4.20 3.672.54 MM (2) 5/2/2017 3: 28:45PM Page 3 nits BAKER HUGHES Annotation TIP KOP COMPASS 5000.1 Build 74 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 @ 109.00usft (2Z-29) Site: Kupamk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (2Z-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Survey F&Ak2 BAKER HUGHES 5/2/2017 328:45PM Page 4 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +NIS +El -W Northing Easting DLS Section Survey Tool Name Annotation (usft) 0 (1) (usft) (usft) (usft) (usft) (ft) (ft) (01100•) (ft) 10,751.26 88.59 321.39 5,944.05 5,835.05 4,648.43 5,367.11 5,961,289.50 534,837.92 7.81 -0648.43 MM (2) 10,780.43 89.39 320.19 5,944.57 5,835.57 4,625.83 5,348.67 5.961.312.03 534,819.40 4.94 4,625.83 MWD (2) 10,810.30 9193 320.46 5,944.22 5,835.22 4602.84 5.329.60 5,961,334.94 534,800.24 8.55 4.602.84 MWD (2) 10,839.89 92.27 320.68 5,943.14 5,834.14 4,580.00 5,310.82 5,961,357.70 534,781.37 1.37 4.580.00 MM (2) 10,874.01 91.81 322.12 5,941.92 5,832.92 4,553.36 5.289.55 5.961384.26 534,760.00 4,43 4,553.36 MWD (2) 10,900.12 91.53 323.26 5,941.16 5,832.16 4,532.60 5,273.73 5,961,404.95 534,744.10 4.49 4,532.60 MWD (2) 10,929.85 91.66 325.33 5,940.33 5,831.33 4,508.47 5,256.39 5,961.429.02 534,726.66 6.97 4,508.47 MWD (2) 10,959.63 91.07 327.43 5,939.62 5,830.62 4,483.68 5,239.90 5,961,453.74 534,710.08 7.32 4,483.68 MM (2) 10,989.53 91.63 329.75 5,938.92 5,829.92 4.458.17 5,224.33 5,961,479.18 534.694.41 7.98 4,458.17 MWD 12) 11819.84 91.44 331.35 5,938.11 5,829.11 4.431.78 5,209.43 5,961505.51 534,679.41 5.31 4.431.78 MWD (2) 11,050.17 90.55 333.02 5,937.58 5,828.58 4,404.96 5,195.28 5,961,532.27 534665.16 6.24 4,404.96 MWD (2) 11879.76 90.49 334.50 5,937.31 5,828.31 4,378.43 5,182.20 5,961,558.75 534,651.97 5.01 4,378.43 MWD (2) 11,114.08 91.60 337.66 5,93669 5,827.69 4,347.06 5,168.29 5,961,590.06 534,637.94 9.76 4,347.06 MM (2) 11,140.22 91.54 339.20 5,935.97 5,826.97 4,322.76 5,158.68 5,961614.32 534,628.24 5.89 4,322.76 MWD (2) 11169.92 90.22 340.73 5,935.51 5,826.51 4,294.86 5,148.51 5,961642.17 534,617.96 6.80 4,294.86 MWD (2) 11,200.16 90.58 343.07 5.935.30 5,826.30 4,266.12 5,139.11 5,961670.87 534,608.45 7.83 4,266.12 MWD (2) 11,232.79 88.89 344.00 5,935.45 5,826.45 4,234.83 5.129.87 5,961,702.12 534,599.08 5.91 4,234.83 MM (2) 11,259.84 89.14 344.27 5935.92 5,826.92 4,208.82 5.122.47 5,961,728.11 534,591.59 1.35 4,208.82 MWD(2) 11,289.74 89.54 344.15 5,936.26 5,827.26 4,180.05 5,114,34 5,961,756.84 534.583.34 1.40 4,180.05 MWD (2) 11,325.16 90.28 344.16 5,936.32 5,82732 4,145.97 5,10467 5,961,790.87 534,573.54 2.09 4,145.97 MWD (2) 11,352.16 89.97 342.73 5,936.26 5,827.26 4,120.09 5,096.97 5,961.816.72 534,565.74 5.42 4,120.09 MWD (2) 11,383.20 9188 344.58 5,935.98 5,826.98 4,090.31 5,088.24 5,961,846.47 534,55569 6.95 4,090.31 MWO(2) 11,410.16 92.80 344.55 5,935.06 5,826.06 4.064.34 5,081.07 5.961872.41 534,549.62 6.3B 4,064.34 MWD (2) 11,446.49 91.94 345.96 5,933.56 5,824.56 4.029.24 5,071.83 5.961907.47 534,540.24 AU 4,029.24 MWD (2) 11,473.42 90.80 347.17 5,932.92 5,823.92 4,003.05 5,065.57 5,961,933.63 534.533.89 6.17 4,003.05 MWD (2) 11,506.66 90.22 349.37 5,932.62 5,823.62 -3,970.51 5,058.82 5,961,966,14 534,527.00 6.84 -3,970.51 MWD (2) 11,534.57 89.78 350.61 5,932.62 5,823.62 -3,943.03 5,053.97 5,961,993.60 534,522.05 4.71 3943.03 MM (2) 11,565.14 90.03 352.37 5,932.67 5,823.67 -3,912.79 5,049.44 5,962,023.81 534.517.40 5.82 -3,912.79 MM (2) 11594.84 89.91 354.31 5,932.69 5,823.69 3883.30 5,046.00 5,962,053.29 534,513.84 6.84 -3,883.30 MWD (2) 11,625.28 91.01 354.95 5,932.44 5,823.44 3852.99 5,043.15 5,962,083.58 534,510.88 4.18 -3,852.99 MM (2) 11660.50 91.23 354.29 5,931.75 5,822.75 -3,817.93 5,039.85 5,962,118.63 534,50744 1.97 -3,817.93 MWD (2) F&Ak2 BAKER HUGHES 5/2/2017 328:45PM Page 4 COMPASS 5000.1 Build 74 Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 @ 109.00usft (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usR (2Z-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Survey Annotation Ih11 HUGHES 5/22017 3:28:45PM Page 5 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc TVD TVDSS +N/S +EI -W Northing Easting OLS Section (usft) (°) (1 (') (usft) (usft) (usft) (usft) (=)1000 Survey Tool Name lRl IR) lRl 11,690,18 90.22 353.68 5,93138 5,822.38 3,788.42 5,036.74 5,962,148.12 534,504.21 398 3,788.42 MWD (2) 11,719.98 90.65 352.79 5,931.15 5,822.15 ],758.83 5,033.23 5,962,177]0 539500.59 3.32 ],758.83 MAID (2) 11,756,83 88.56 353.11 5,93141 5,822.41 ]722.26 5,028.71 5,962,214.25 534.495.92 574 3,72226 MWD (2) 11,786.73 89.08 354.40 5,932.02 5,823.02 -3,692.54 5,025.45 5,962,243.95 534,492.55 4.65 3,692.54 MWD (2) 11,819.05 88.43 355.59 5,932.72 5,823.72 3,660,36 5,022.63 5,962,276.12 534489.61 4.19 3,660.36 MAID (2) 11,850.21 88.19 356.67 5,933.64 5,824.64 3,629.28 5,020.53 5,962,307.18 534,487.38 3.55 3,629.28 MWD (2) 11,885.22 89.02 358.61 5,934.50 5,825.50 -3,594.31 5,019.09 5,962,342.14 534485.81 6.03 3,594.31 MWD (2) 11,915.19 88.55 359.28 5,935.13 5,826.13 -3,564.36 5,018.54 5,962,372,09 534485.14 2.73 3,564.36 MWD (2) 11,945.12 88.05 359.62 5,936.02 5,827.02 3,534.44 5,018.25 5,962,402.00 534,484.73 2.02 3,534.44 MWD(2) 11,978.02 88.40 1.32 5,937.09 5,828.04 3,501.56 5,018.52 5,962,434,88 534484.87 5.27 3,501.56 MWO(2) 12,005.50 89.02 3.12 5,937.66 5,828.66 3,474.11 5,019.59 5,962,462.34 534485.83 6.93 3,474.11 MM (2) 12,035.24 88.28 3.16 5,936.36 5,829.36 3,444.42 5,021.21 5,962,492.03 534487.34 2.49 3,444.42 MAID (2) 12,065.28 88.13 4.85 5,939.30 5,830.30 3,414.47 5,023.31 5,962,521.98 534489.32 5.65 3,414.47 MWD (2) 12,095.21 87.60 6.08 5,940.41 5,831.41 3,384.70 5,026.16 5,962,551.76 534,492,05 4.47 3,384.70 MWD (2) 12.125.22 87.45 7.67 5.941.71 5,832.71 3,354.93 5.029.75 5,962,581.54 534.495.52 5.32 3,354.93 MWD (2) 12,155,62 87.20 8,84 5,943.13 5,834.13 3,324.88 5,034.11 5,962,611.60 534499.77 3.93 3,324.88 MWD (2) 12.183.78 87.70 9.95 5,944.38 5,835.38 3,297.13 5,038.70 5,952,639.37 534,504.25 4.32 3,297.13 MWD (2) 12.217.80 87.60 13.52 5,945.78 5,836.78 3,263.65 5,095.61 5,962,672.67 534,511.03 10.49 3,263.85 MWD (2) 12,247.05 85.70 14.50 5,947.49 5,838.49 -3,235.52 5,052.68 5,962,701.03 534,517,99 7.31 3,235.52 MWD (2) 12,275.18 87.45 18.08 5,949.17 5,840.17 3,208.57 5,060.56 5,962,728.00 534,525.75 14.14 3,208,57 MM (2) 12.310.44 85.88 19.47 5,951.22 5,842.22 3,175.25 5,071.89 5,962,761.37 534,536.95 5.94 3,175.25 MWD (2) 12,340.69 90.18 22.98 5,952.26 5,843.26 3,147.08 5,082.83 5,962,789.58 534,547.78 18.34 3,147.08 MM (2) 12,399.00 90.18 22.98 5,952.08 5,843.08 3,093.40 5,105.59 5,962,843.34 534,570.33 0.00 3,093.40 PROJECTED to TD Annotation Ih11 HUGHES 5/22017 3:28:45PM Page 5 COMPASS 5000.1 Build 74 ri&2 BAKER HUGHES Ib: MAY 0 4 2017 AOGCC Letter of Transmittal Date: DATA LOGGED May 4, 2017 NSK /4 /201-7 BENDER Makana Bender AOGCC 333 West 7h Ave, Suite 100 Anchorage, Alaska 99501 From: Yosha Ragbirsingh / Michael Soper Baker Hughes INTEQ 795 East 94`h Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3M -14A 2 1 6 1 7 1 28 17 1 2Z-29L1PB1 2 1 TO 4 5 2 8 1 7 0 2Z -29L1 2 1 7 0 4 5 28 16 9 (3) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael. Soper@BakerHughes.com Yosha Ragbirsingh, Baker Hughes, Survey Manager Yosha.Ra birsingh BakerHu hes.com 21 6045 28170 RECEIVED ConocoPhillips MAY 0 4 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z -29L1 50-029-21881-60 Baker Hughes INTEQ F/RI BAKER Definitive Survey Report HUGHES 02 May, 2017 Well 2Z-29 2Z-29 @ 109.00usft (2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox //.11 BAKER HUGHES Map System: US State Plane 1927 (Exact solution) ConocoPhillips ConocoPhillips Definitive Survey Report Company: Conoco Phillips(Alaska) Inc.-Kup2 Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 2Z Pad MD Reference: Well: 2Z-29 North Reference: Wellbore: 2Z-29 Survey Calculation Method: Design: 2Z-29 Database: Project Kuparuk River Unit, North Slope Alaska, United States Well 2Z-29 2Z-29 @ 109.00usft (2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox //.11 BAKER HUGHES Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level i Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 2Z-29 Well Position +N/ -S 0.00 usft Northing: 5,965,916.38usft Latitude: 70° 19 4.634 N +E/ -W 0.00 usft Fasting: 529,453.15usft Longitude: 149° 45'40.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 2Z -29L1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 7/1/2017 17.52 80.93 57.537 Design 2Z-291_1 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 11,565.14 f Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I A 109.00 0.00.. 0.00 Date 4/24/2017 ...0.00'"—"._.e _.. Survey Program - From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date i 200.00 9,800.00 2Z-29 (2Z-29) BOSS -GYRO Sperry -Sun BOSS gyro multishot 1/16/2001 9,889.00 11,565.14 2Z-29L1PB1 (2Z-29L1PB1) MWD MWD -Standard 4/10/2017 4/18/2017 11,575.00 13,119.72 2Z-291_1 (2Z -29L1) MWD MWD - Standard 4/19/2017 4/23/2017 &22017 3:29:59PM Page 2 COMPASS 5000.1 Build 74 Survey . _... __.. _. ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 2Z-29 Project: Kuparuk River Unit TVD Reference: 2Z-29 @ 109.00usft (2Z-29) Site: Kuparuk 2Z Pad MD Reference: 2Z-29 @ 109.00usft (2Z-29) Well: 2Z-29 North Reference: True Wellbore: 2Z-29 Survey Calculation Method: Minimum Curvature Design: 2Z-29 Database: EDM Alaska NSK Sandbox Survey . _... __.. _. 572/2017 3:29: 59PM Page 3 RAFAIN BAKER HUGHES i i Annotation i TIP KOP i 3 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W DLS (usft) (1) (1) (usft) (usft) (usft) (usft) Northing Easting (`/100') Section Survey Tool Name (ft) (ft) (ft) 11,565.14 90.03 35237 5,93267 5,823.67 -3,912.79 5,04944 5,962,023.81 534517.40 5.82 -3,912.79 MP/D(2) 11,575.00 89.99 353.01 5,932.67 5,823.67 -3,903.01 5,048.19 5,962,033.59 534,516.11 6.50 3,903.01 MWD (3) 11,605.30 94.77 354.86 5,931.41 5,822.41 3,872.92 5,044.99 5,962,06367 534,512.79 16.91 3,872.92 MM (3) 11,630.24 94.00 35469 5,929.51 5,820.51 3,848.16 5,042.72 5,962,088.42 534510.43 3.16 3,848.16 MWD (3) 11,660.64 90.77 356.88 5,928.24 5,819.24 -3,817.87 5,040.49 5,962,11869 534,508.08 12.83 -3,817.87 MM (3) 11,697.88 90.43 0.91 5,927.85 5,818.85 3,780.65 5,039.78 5,962,155.91 52A.W7.22 10.86 3,780.65 MWD (3) 11,731.94 90.74 6.34 5,927.50 5,818.50 3,746.67 5,041.93 5,962,189.89 534,509.24 15.97 -3,746.67 MWD (3) 11,770.11 90.37 971 5,927.13 5,818.13 -$708.88 5,047.26 5,962,227.70 534514.42 8.88 -3,708.88 MWD (3) 11,802.40 89.60 14.12 5,927.14 5,818.14 3,677.30 5,053.92 5,962,259.30 534,520.96 1386 -3,677.30 MWD (3) 11,830.27 87.79 15.84 5,927.78 5,818.78 -3,650.38 5,061.12 5,962,286.24 534,528.05 8.96 -3,650.38 MWD (3) 11,861.30 86.44 13.54 5,929.34 5,820.34 -3,620.41 5,068.98 5,962,31625 534,535.79 8.59 -3,620.41 MWD(3) 11890.18 87.27 10.21 5,930.92 5,821.92 -3,592.19 5,074.91 5,962,34448 534,541.61 11.87 -3,592.19 MWD(3) 11,920.08 87.54 9.59 5,932.28 5,823.28 -3,562.77 5,080.05 5,962,37392 534,54663 2.26 -3,562.77 MWD(3) 11,948.50 88.80 4.82 5,933.18 5,824.18 -3,534.59 5,083.61 5,962,402.11 534,550.08 17.35 -3,534.59 MWD (3) 1198079 87.11 262 5,934.34 5,825.34 -3,502.40 5,085.70 5,962,434.31 534,552.05 8.59 -3,502.40 MWD (3) 12,010.29 87.11 359.05 5,935.82 5,626,82 -3,472.94 5,086.13 5,962,46376 534,552.36 1209. -3,472.94 MWD (3) 12,036.32 87.75 355.17 5,936.99 5,827.99 -3,446.96 5,085.05 5,962,489.73 534,551,18 11.32 -3,446.96 MWD(3) 12,070.69 88.53 352.68 5,938.11 5,829.11 -3,412.78 5,081.71 5,962,52390 534,547.71 10.40 -3,412.78 MM (3) 12,100.36 89.29 357.18 5,938.67 5,829.67 -3,383.22 5,079.09 5,962,553.45 534,544.97 15.37 -3,383.22 MWD(3) 12,130.18 88.25 0.57 5,939.31 5,830.31 -3,353.44 5,078.50 5,962,583.23 534,544.27 11.90 -3,353.44 MWD(3) 12,157.99 8660 373 5,940.22 5,831.22 -3,325.66 5,079.55 5,962,611.00 534,545.20 11.39 -3,325.66 MWD (3) 12,184.36 88.40 7.04 5,941.05 5,832.05 -3,299.43 5,082.02 5,962,637.24 534,547.57 12.64 -3,29943 MWD (3) 12,213.19 87.91 8.38 5,941.98 5,832.98 -3,270.87 5,085.89 5,962,665.81 534,551.32 4.95 -3,270.87 MWD (3) 12,245.45 88.15 11.55 5,943.09 5,834.09 -3,239.12 5,091.46 5,962,697.58 534,556.78 9.85 -3,239.12 MWD(3) 12.278.22 90.28 14.10 5,943.54 5,834.54 -3,207.18 5,09874 5,962,729.55 534,563.92 10.14 -3,207.18 MM (3) 12,310.74 88.99 18.27 5,943.74 5.834.75 -3,175.96 5,107.80 5,962,760.80 534,572.86 13.42 -3,17596 MWD (3) 12,335.16 90.49 19.39 5,943.86 5.WA. 56 -3,152.84 5,11568 5,962,783.94 534,580.65 7.67 -3,152.84 MWD (3) 12,36035 9031 17.90 5,943.68 5,834.68 -3,128.98 5,123.73 5,962,807.84 534,588.61 5.96 -3,128.98 MM (3) 12,391.98 89.54 13.08 5,943.72 5,83432 -3,098.50 5,132.18 5,962,838.34 534,596.94 1543 -3,098.50 MWD (3) 12.421.80 90A6 12.23 5,943.83 5,83463 -3,069.41 5,138.71 5,962,867.46 534,603.35 3.34 -3,069.41 MWD (3) 572/2017 3:29: 59PM Page 3 RAFAIN BAKER HUGHES i i Annotation i TIP KOP i 3 COMPASS 5000.1 Build 74 ConocoPhillips Company: Cono,mPhillips (Alaska) Inc. -Kup2 . Project: Kuparuk River Unit Site: Kuparuk 2Z Pad Well: 2Z-29 Wellbore: 2Z-29 Design: 2Z-29 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 2Z-29 2Z-29 @ 109.00usft (2Z-29) 2Z-29 @ 109.00ul (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox 5/712017 3:29:59PM Page 4 F/,Rd BAKER HUGHES Annotation COMPASS 5000.1 Build 74 1 Map Map Vertical MD Inc Azi TVD NDSS +N/ -S +EFW DLS just) (°) (I Wait) (ust) (usR) just) Northing Seating (°1100') Section Survey Tool Name (ft) (ft) (ft) 12,449.67 89.99 trail 5,943.83 5,834.83 -3,042.15 5,144.51 5,962,894.74 534,609.05 1.57 -3,042.15 MM (3) 12,480.29 90.37 13.25 5,943.74 5,BM74 -3,012.26 5,151.16 5,962,92465 53.615.57 4.91 -3,012.26 MM (3) 12,510.42 89.72 17.23 5,943.72 5,834.72 -2,983.20 5,159.08 5,962,953.74 53.623.38 13.38 -2,983.20 MM (3) 12,541.35 89.75 18.12 5,943.86 5,834.86 -2,953.73 5,168.47 5,962,98324 534,632.65 2.88 -2,953.73 MWD(3) 12,577.80 89.94 21.57 5,943.96 5,834.96 -2,919.45 5,180.84 5,963,01757 534,644.89 9.48 -2,919.45 MWD (3) 12,600.27 88.83 22.17 5,944.20 5,835.20 -2,898.60 5,189.21 5,963,038.45 534,653.18 5.62 -2,898.60 Ml (3) 12,631.57 88.28 25.11 5,944.99 5,835.99 -2,869.93 5,201.75 5,963,067.16 534,665.61 9.55 -2,869.93 MM (3) 12,655.63 89.14 27.21 5,945.53 5,836.53 -2,848.35 5,212.36 5,963,088.79 534,676.13 9.43 -2,848.35 MWD(3) 12,683.85 89.75 28.29 5,945.81 5,836.81 -2,823.37 5,225.50 5,963,113.81 534,689.17 4.40 -2,823.37 MVM (3) 12,715.23 8935 32.43 5,946.05 5,837.05 -2,796.30 5,241.35 5,963,140.94 534,704.91 13.25 -2,796.30 MWO(3) 12,745.19 88.12 29.16 5,946.71 5,837.71 -2,770.58 5,256.69 5,963,166.72 534,720.14 11.66 -2,770.58 MWD (3) 12,775.07 87.39 27.42 5,947.88 5,838.89 -2,744.29 5,270.84 5,963;193.06 534,734.19 6.31 -2,744.29 MWD (3) 12,801.05 88.12 23.46 5,948.90 5,839.90 -2,720.84 5,281.99 5,963,216.55 534,745.25 15.48 -2,720.84 MWD (3) 12,829.36 8733 20.06 5,95063 5,841.03 -2,694.58 5,292.47 5,963,24265 534,755.63 12.32 -2,694.58 MWD (3) 12,857.14 87,85 16.85 5,951.20 5,84220 -2,668.26 5,301.26 5,963,269.20 534,764.31 11.70 -2,668.26 MWD (3) 12,886.36 88.25 14.53 5,952.19 5,a43.19 -2,640.15 5,309.15 5,963,297.34 534,772.09 8.05 -2,640.15 MWD(3) 12,917.28 85.82 12.59 5,953.79 5,844.79 -2,610.13 5,316.39 5,963,327.38 534,779.21 10.05 -2,610.13 MWD (3) 12,946.23 86.04 10.33 5,955.84 5,846.84 -2,561.83 5,322.13 5,963,355]0 534,784.84 7.82 -2,581.83 MWD(3) 12,974.56 85.58 7.64 5,957.91 5,848.91 -2,553.93 5,326.54 5,963,383.62 534,789.14 9.61 -2,553.93 Ml (3) 13,007.43 B7.26 4.24 5,959.W 5,850.97 -2,521,30 5,329.93 5,963,416.26 534,792.41 11.52 -2,521.30 MM (3) 13,034.08 8205 358.85 5,961.29 5,852.29 -2,494.71 5,330.65 5,963,442.85 53.793.02 2022 -2,494.71 MWD (3) 13,065.38 86.22 1.40 5,963.13 5,854.13 -2,463.46 5,330.74 5,963,474.09 534,792.99 8.80 -2,463.46 MWD(3) 13,091.30 87.67 35667 5,964.51 5,855.51 -2,437.59 5,330.32 5,963,499.96 534,79247 19.36 -2,437.59 MWD (3) 13,119.72 87.97 354.50 5,965.59 5,866.59 -2,409.28 5,328.14 5,963,52826 534,790.17 7.70 -2,409.28 MWD(3) 13,162.00 87.97 354.50 5,96709 5,858.09 -2,367.22 5,32469 5,963,570.30 534,785.96 0.00 -2,367.22 PROJECTED to TD 5/712017 3:29:59PM Page 4 F/,Rd BAKER HUGHES Annotation COMPASS 5000.1 Build 74 1 21 6045 28 16 9 RECEIVED ConocoPhillips MAY 0 4 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z -29L1 PB1 50-029-21881-70 Baker Hughes INTEQ W/kI BAKER Definitive Survey Report HUGHES 02 May, 2017 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 2Z Pad MD Reference: Well: 2Z-29 North Reference: Wellbore: 2Z-29 Survey Calculation Method: Design: 2Z-29 Database: Well 2Z-29 2Z-29 Q 109,00usft (22-29) 2Z-29 r@ 109.01(2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 5,965,916.38usft Latitude: 529,453.15usft Longitude: usft Ground Level: Declination C) 17.52 Design 2Z-291_1 P81 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,800.00 Vertical Section: Depth From (TVD) +N/ -S' (usft) (usft) j 109.00 0.00 Dip Angle (`) 80.93 +E/ -W Kuparuk River Unit, North Slope Alaska, United Slates (usft) Project Map System: US Slate Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) Survey Survey Map Zone: Alaska Zone 04 Survey(Wellbore) Tool Name Description Start Date End Date 200.00 Well 2Z-29 BOSS -GYRO Sperry -Sun BOSS gyro multishot Well Position +N/ -S 0.00 usft Northing: 2Z-29L1PB1 (2Z-29L1PB1) +E/ -W 0.00 usft Binding: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 2Z-29Li PBI Magnetics Model Name Sample Date BGGM2016 7/1/2017 Well 2Z-29 2Z-29 Q 109,00usft (22-29) 2Z-29 r@ 109.01(2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 5,965,916.38usft Latitude: 529,453.15usft Longitude: usft Ground Level: Declination C) 17.52 Design 2Z-291_1 P81 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,800.00 Vertical Section: Depth From (TVD) +N/ -S' (usft) (usft) j 109.00 0.00 Dip Angle (`) 80.93 +E/ -W Direction (usft) V) 0.00 0.00 AF11 X UGHES 70° 19'4.634 N 149" 45'40.513 W 0.00 usft Field Strength (nT) 57.537 Survey Program Date 4/24/2017 From To Survey Survey (usft) (usft) Survey(Wellbore) Tool Name Description Start Date End Date 200.00 9,800.00 2Z-29 (2Z-29) BOSS -GYRO Sperry -Sun BOSS gyro multishot 1/162001 j 3 9,889.00 12,340.69 2Z-29L1PB1 (2Z-29L1PB1) MWD MWD - Standard 4/10/2017 4/18/2017 5/2/2017 3:28:45PM Page 2 COMPASS 5000.1 Build 74 Survey Well 2Z-29 2Z-29 @ 109.00usft (2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 2Z Pad MD Reference: Well: 2Z-29 North Reference: Wellbore: 2Z-29 Survey Calculation Method: Design: 2Z-29 Database: Survey Well 2Z-29 2Z-29 @ 109.00usft (2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox 5WO17 3.28.45PM Page 3 AFIS BAKER HUGHES Annotation TIP KOP COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easfing DLS Section (usft) (°) (°) lust) Weft) (uaft) (use) 1°/100') Survey Tool Name (111) (g) (fti 9,600.00 5248 13220 5,921.91 5,812.91 4,967.61 5,154.82 5,960,96952 534,62691 3.33 -4,967.61 MVJD(2) 9,889.00 5248 13264 5,976.11 5,667.11 -5,015.23 5,206.93 5,960,922.11 534,679.20 0.39 -5,015.23 Ml (2) 9,908.15 57.08 132.60 5,987.16 5,878.16 -5,025.82 5,218.44 5,960,911.57 534,690.75 24.02 -5,025.82 Ml (2) 9,938.15 67.17 132.60 6,001.16 5,892.16 -5,043.75 5,237.93 5,960,893.72 534,710.31 33.63 -5,043.75 Ml (2) 9,970.65 79.65 132.60 6,010.37 5,901.37 -5,034.80 5,260.82 5,960,872.76 534,733.28 39.02 -5,034.80 MM (2) 10,005.18 91.38 132.84 6,013.01 5,904.01 -5,088.12 5,286.08 5,960,84954 534,75862 33.40 -5,088.12 MWD (2) 10,035.44 100.81 128.85 6,009.80 5,900.80 5,107.78 5,308.80 5,960,829.98 534,781.42 33.80 -5,107.78 MWD (2) 10,065.10 104.59 118.73 6,003.26 5,894.26 -5,123.86 5,332.80 5,960,81399 534,805.48 3563 -5,123.86 MWD (2) 10,095.43 105.13 10641 5,995.45 5,886.45 -5,135.09 5,359.81 5,960,802.87 534,832.53 39.30 -5,135.09 MWD (2) 10,125.24 104.05 93.56 5,987.91 5,878.91 5,140.07 5,388.15 5,960,798.00 534,860.89 41.87 -5,140.07 Ml (2) 10,155.23 105.54 81.65 5,980.23 5,871.23 5,138.87 5,417.07 5,960,799.31 534,889.80 38.71 -5,138.87 MWD (2) 10,18579 104.17 69.98 5,972.37 5,863.37 5,131.64 5,445.64 5,960,80665 534,918.34 37.18 5,131.64 MWD (2) 10,21575 103.07 55.78 5,965.28 5,856.28 -5,118.40 5,471.48 5,950,819.99 534,944.13 46.20 -5,118.40 MWD(2) 10,24543 102.34 42.54 5,956.73 5,84973 5,099.51 5,493.33 5,960,83897 534,965.90 43.55 5,099.51 MWD (2) 10,276.57 102.31 29.18 5,952.05 5,843.05 5,074.91 5,511.11 5,960,863.63 534,983.58 41.91 -5,074.91 Ni (2) 10,305.18 96.67 22.50 5,947.33 5,838.33 5,049.53 5,523.38 5,980,889.05 534,995.75 30.31 5,049.53 MWD (2) 10,335.03 92.89 12.06 5,944.84 5,835.84 -5,021.17 5,532.20 5,960,917.45 535,004.45 37.08 5,021.17 Ml (2) 10,360.27 91 41 359.88 5,943.89 5,834.89 4.996.13 5,534.81 5,960,942.49 535,006.97 48.58 -0,996.13 MM (2) 10,390.96 90.64 345.63 5,943.33 5,834.33 4,965.77 5,530.95 5,960,972.84 535,002.99 46.49 4,965.77 Ml (2) 10,417.70 90.80 343.90 5,943.00 5,834.00 4,939.98 5,523.93 5,960,99860 534,995.87 6.50 4,939.98 MM (2) 10,446.20 89.26 340.97 5,942.98 5,833.98 4,912.81 5,515.33 5,961,025.73 534,987.16 11.61 4,91281 Ml (2) 10,478.89 91.84 339.66 5,942.67 5,833.67 4.882.03 5,504.32 5,961,05846 534,976.03 8.85 4,882.03 MWD(2) 10,505.31 92.18 337.77 5,941.74 5,83274 4,857.43 5,494.73 5,961,08102 534,96635 7,26 4,857.43 MWD(2) 10,53576 93.16 336.01 5,940.32 5,831.32 3,82946 5,482.80 5,961,108.95 534,954.31 6.61 4,829.46 MAD (2) 10,570.12 91.93 332.48 5,938.80 5,829.80 4,798.55 5,467.88 5,961,13980 534,939.27 10.87 3)98.55 MM (2) 10,599.87 88.65 329.10 5,936.65 5,829.65 4,772.59 5,453.37 5,961,165.70 534,924.66 15.83 4,772.59 Ml (2) 10,630.84 88.56 327.34 5,939.40 5,830.40 3,746.27 5,437.06 5,961,191.95 534,908.25 5.69 4.746.27 MWD (2) 10,661.66 8793 325.91 5,940.40 5,831.40 3,720.55 5,420.12 5,961,217,60 534,891.21 5.36 3,720.55 MWD (2) 10,690.58 86.77 323.75 5,941.79 5,832.79 3,696.93 5,403.48 5,961,241.14 534,874.48 8.17 3,696.93 Ill (2) 10,720.87 88.04 323.70 5,943.16 5,834.15 3,672.54 5,385.58 5,961,265.47 534,856.48 4.20 4,672.54 Ml (2) 5WO17 3.28.45PM Page 3 AFIS BAKER HUGHES Annotation TIP KOP COMPASS 5000.1 Build 74 ConocoPhillips ConocoPhillips Definitive Survey Report Company: Project: Site: Well: Wellbore: Design: ConocoPhillips (Alaska) Inc -Kup2 Kuparuk River Unit Kupamk 2Z Pad 2Z-29 2Z-29 2Z-29 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 2Z-29 2Z-29 @ 109.00usft (2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox V Survey - MD Inc Azi TVD TVDSS +N/ -S +E/ -W Map Map DLS Vertical (usft) (°) (°) (usft) (usft usft ( ) (usft) Northing Easting (°/100') Section Survey Tool Name Y (ft) (ft) (ft) 10,751.26 88.59 32139 5,944.05 5,835.05 4,646.43 5,367.11 5,961,289.50 534,837.92 7.81 4,648.43 MWD (2) 10,780.43 89.39 320.19 5,944.57 5,835.57 4,625.83 5,348.67 5,961,312.03 534,819.40 4.94 4,625.83 MWD (2) 10,81030 91.93 320.46 5,944.22 5,835.22 1.602.84 5,329.60 5,961,334.94 53,800.24 6.55 4,602.84 MWD (2) 10,839.89 92.27 320.68 5,943.14 5,834.14 4,580.00 5,310.82 5,961,357.70 53,781.37 1.37 4,580.00 MM (2) 10,87401 91.81 322.12 5,941.92 5,832.92 4,553.36 5,289.55 5,961,384.26 53,760.00 4.43 4,553.36 MWD (2) 10,900.12 91.53 323.26 5,941.16 5,832.16 4,532.60 5,273.73 5,961,404.95 534,744.10 4.49 4,532.60 MM (2) 10,929.85 91.66 325.33 5,940.33 5,831.33 4,508.47 5,256.39 5,961,42902 534,726.66 6.97 4,508.47 MWD (2) 10,959.63 91.07 327.43 5,93962 5,830.62 4,483.68 5,239.90 5,961,45374 534,710.08 7.32 4,483.68 MWD (2) 10,989.53 91.63 329.75 5,938.92 5,829.92 4,458.17 5,224.33 5,961,479.18 534,694.41 7.98 4458.17 MWD (2) 11,019.84 91.44 331.35 5,938.11 5,829.11 4,431.78 5,20943 5,961,505.51 534,679.41 5.31 4,431.78 MWD (2) 11,050.17 90.55 33302 5,937.58 5,828.58 4,404.96 5,19528 5,961,532.27 534,665.16 6.24 4,404.96 MM (2) 11,079.76 90.49 334.50 5,937.31 5,828.31 4,37643 5,182.20 5,961,558.75 534,651.97 5.01 4,378.43 MM (2) 11,114.08 91.60 337.66 5,936.69 5,827.69 4,34]06 5,168.29 5,961,590.06 534,637.94 9.76 4,347.06 MWD (2) 11,140.22 91.54 339.20 5,935.97 5,826.97 4,322.76 5,158.68 5,961,614.32 53,628.24 5.89 4,322.76 MM (2) 11,169.92 9022 340.73 5,935.51 5,826.51 4,294.86 5,148.51 5,961,642.17 534,617.96 6.80 4,294.86 MWD (2) 11,200.16 90.58 34307 5,935.30 5826.30 4,266.12 5,139.11 5,961,670.87 534,608.45 7.83 4,266.12 MM (2) 11,232.79 88.89 344.00 5,935.45 5,826.45 4,234.83 5,129.87 5,961,702.12 534,599.08 5.91 4,234.83 MM (2) 11,259.84 89.14 344.27 5,935.92 5,826.92 4,208.82 5,12247 5,961,728.11 534,591.59 1.36 4,208.82 MWD (2) 11,289.74 89.54 344.15 5,936.26 5,827.26 4,180.05 5,114.34 5,961,756.84 534,583.34 1,40 4,180.05 MM (2) 11,325.16 90.28 344.16 5,936.32 5,827.32 4,145.97 5,104.67 5,961,790.87 534,573.54 2.09 4,145.97 MWD (2) 11,352.16 89.97 342.73 5,936.26 5,827.26 4.120.09 5,096.97 5,961816.72 534,565.74 5.42 4,120.09 MWD (2) 11,383.20 91.06 344.58 5,93598 5,826.98 4,090.31 5,088.24 5,961,846.47 534,55689 6.95 4,090.31 MWD (2) 11,410.16 92.80 344.55 5,93506 5,826.06 4064.34 5,08107 5,961,872.41 534,549.62 6.38 4,064.34 MVV (2) 11,446.49 91.94 345.96 5,933.56 5,824.56 4,029.24 5,071.83 5,961,907.47 53,540.24 454 4,029.24 MWD (2) 11,47342 90.80 347.17 5,932.92 5,823.92 4,003.05 5,065.57 5,961,93363 534,533.89 6.17 4,003.05 MM (2) 11,506.66 90.22 349.37 5,932.62 5,823.62 -3,970.51 5,058.82 5,961,966.14 534,527.00 6.84 -3,970.51 MM (2) 11,534.57 8978 35061 5,932.62 5,823.62 -3,94303 5,053.97 5,961,993.60 534,522.05 4.71 -3,943.03 MVJD(2) 11,555.14 9003 352.37 5,932.67 5,823.67 3,912.79 5,049.44 5,962,023.81 53,51740 5.82 -3,912.79 MWD (2) 11,594.84 8991 354.31 5,932.69 5,823.69 -3,883.30 5,046.00 5,962,05329 534,513.84 6.54 -3,883.30 MWD (2) 11,625.28 91.01 354.95 5,932.44 5,82344 -3,852.99 5,043.15 5,962,08358 534,510.88 4.18 -3,852.99 MWD (2) 11,660.50 91.23 354.29 5,93175 5,822.75 -3,817.93 5,039.85 5962,11663 534,50744 1.97 -3,817.93 MWD(2) SWO17 3:28:45PM Page 4 EARN HUGHR ES Annotation COMPASS 5000.1 Build 74 1 ConocoPhillips RPM ConocoPhillips Definitive Survey Report RAKER HUGHES Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 2Z Pad Well: 2Z-29 Wellbore: 2Z-29 Design: 2Z-29 Survey Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 2Z-29 2Z-29 @ 109.00usft(2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature EDM Alaska NSK Sandbox Annotation 51212017 3:28, 45PM Page 5 COMPASS 5000.1 Build 74 Map Map Vertical MD Inc Azi TVD NDSS .W -S *P✓ -W DLS (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Northing Easting (low) Section Survey Tool Name (ft) (ft) 11,690.18 90.22 35368 5,931.38 5,822.38 -3,788.42 5,036.74 5,962,148.12 534,504.21 3.96 -3,788.42 MWD (2) 11,719.98 9065 352.79 5,931.15 5,822.15 -3,758.83 5,033.23 5,952,177.70 534,500.59 3.32 -3,75083 MWO(2) 11,755.83 88.56 353.11 5,931.41 5,822.41 -3,72226 5,028.71 5,962,214.25 534,495.92 5.74 -3,72226 MWD (2) 11,786.73 89.08 354.40 5,932.02 5,82302 3,692.54 5,025.45 5,962,243.95 53,492.55 4.65 3,692.54 MWD (21, 11,819.05 88.43 355.59 5,932.72 5,823.72 3,660.36 5,022.63 5,962,276.12 534,489.61 4.19 3,660.36 MM (2) 11.850.21 88.19 356.67 5,933.64 5,824.64 -3,629.28 5,020.53 5,962,307.18 534,487.38 3.55 -3,629.28 MWD (2) 11,885.22 89.02 358.61 5,934.50 5,825.50 -3,594.31 5,019.09 5,962,342.14 534,485.81 603 -3,594.31 MWD (2) 11,915.19 88.55 359.28 5,935.13 5,826.13 -3,564.36 5,018.54 5,962,372.09 534,485.14 2.73 -3,564.36 MM (2) 11,945.12 88.05 359.62 5,936.02 5,827.02 -3,53444 5,018.25 5,962,402.00 534,484.73 2.02 -3,534.44 MWD (2) 11,978.02 MAO 1.32 5,937.04 5,828.09 -3,501.56 5,018.52 5,962,434.88 534,484.87 5.27 3,501.56 MWD (2) 12,005.50 89.02 3.12 5,937.66 5,828.66 -3,474.11 5,019.59 5,962,462.34 534,485.83 6.93 -3,474.11 MWD (2) 12,035.24 8828 3.16 5,938.36 5,829.36 3.444.42 5,021.21 5,962,49203 534,487.34 2.49 3,444.42 MWD (2) 12,065.28 88.13 4.65 5,939.30 5,830.30 3,414.47 5,023.31 5,962,521.98 534,489.32 5.65 3,414.47 MM (2) 12,095.21 87.60 6.08 5,94041 5,831.41 -3,384.70 5,026.16 5,962,551.76 534,492.05 4,47 -3,384.70 MWD (2) 12,125.22 87.45 767 5,941.71 5,832.71 -3,354.93 5,029.75 5,962,581.54 534,495.52 5.32 -3,354.93 MWD (2) 12,155.62 87.20 8.84 5,943.13 5,834.13 -3,324.88 5,034.11 5,962,611,60 534,499.77 3.93 -3,324.88 MWD (2) 12,183.78 87.70 9.95 5,944.38 5,835.38 -3,297.13 5,038.70 5,962,639.37 534,504.25 4.32 -3,297.13 MM (2) 12,217.80 87.60 13.52 5,945.78 5,836.78 -3,263.85 5,045.61 5,962,672.67 534,511.03 10.49 -3,263.85 MWD(2) 12,247.05 85.70 14.50 5,947.49 5,838.49 -3,235.52 5,052.68 5,962,701.03 534,517.99 7.31 3,235.52 MWO(2) 12,275.18 87.45 18.08 5,949.17 5,840.17 -3,208.57 5,060.56 5,962,72000 534,525.75 14.14 3,206.57 MWD (2) 12,310.49 85.88 19.47 5,951.22 5,642.22 -3,175.25 5,071.89 5,962,761.37 534,536.95 5.94 3,175.25 MM (2) 12,340.69 90.18 22.98 5,952.26 5,643.26 3,147.08 5,082.83 5,962,789.58 534,54778 18.34 3,147.08 MM (2) 12,399.00 90.18 22.98 5,952.08 5,843.08 -3,093.40 5,105.59 5,962,843.34 534,570.33 0.00 -3,093.40 PROJECTED to TD Annotation 51212017 3:28, 45PM Page 5 COMPASS 5000.1 Build 74 I THE STATE Alaska Oil and Gas °fALASKA Conservation Commission GOVERNOR BILL WALKER James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 2Z -29L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-045 Surface Location: 4121' FNL, 257' FEL, Sec. 11, TI IN, R9E, UM Bottomhole Location: 1334' FNL, 225' FEL, Sec. 13, TI 1N, R9E, UM Dear Mr. Ohlinger: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 188-129, API No. 50-029- 21881-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Q 1 Cathy Chair DATED this % day of April 2017. STATE OF ALASKA KA OIL AND GAS CONSERVATION COItf PERMIT TO DRILL 20 AAC 25.005 RECEIVED ION APR 0 7 2011 AOr2M. 1 a. Type of Work: Proposed Well Class: Exploratory - Gas L] Service - WAG L] Service - Disp E]1c. Specify if well is proposed for: Drill F-1Lateral • ❑� Ilb. Stratigraphic Test ❑ Development - Oil ❑� • Service - Winj ❑ Single Zone ❑� Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180 KRU 2Z -29L1 ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 13000' TVD: 5972' , Kuparuk River Pool / 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): 39 Surface:4121' FNL, 257' FEL, Sec 11, T11 N, R9E, UM ADL 25653 aS 6y% River Oil Pool Top of Productive Horizon: 8. Land Use Permit: 13. Approximate Spud Date: 3858' FNL, 336' FEL, Sec 13, T11 N, R9E, UM ALK 2579 4/10/2017 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 1334' FNL, 225' FEL, Sec 13, T11 N, R9E, UM 2660- ,S 1 oZd 29510' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 109', 15. Distance to Nearest Well Open Surface: x- 529453 y- 5965916 Zone- 4 GL Elevation above MSL (ft): 68' to Same Pool: 8241, 2Z-07 16. Deviated wells: Kickoff depth: 9886 feet - 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 104 degrees Downhole: 3681 � Surface: 3084 1 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hale Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 3119' 9881' 5971' 13000' 5972' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 10457' 6337' N/A 10300' 6233' 10068' Casing Length Size Cement Volume MD TVD Conductor 115' 16" 182 sx AS III 115' 115' Surface 5075' 9-5/8" 1100 sx AS III & 500 sx Class G 5184' 3551' Production 10274' 7" 485 sx Class G 10383' 6289' `10002'- Perforation Depth MD (ft): 9792'- 9850', 10022', 10034' Depth TVD (ft): 5917' - 59521, 6045' - 60581, 10090', 10134'- 10166' ]Perforation 6065'- 6100', 6127'- 6148' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis El Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑Q 20 AAC 25.050 reWpientsFal 21. Verbal Approval: Commission Representative: Date 7 / 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Keith Herring @ 263-4321 be deviated from without prior written approval. Contact Email Keith. E.Herring(aDcoD.com Printed Name J. Ohlinger Title Staff CTD Engineer Signature Phone 265-1102 Date 'V711% Commission Use Only Permit to Drill API Number: Permit ApprovalSee cover letter for other Number: -��S 50- - C) - ate: +-7-I-7 requirements. Conditions of approval : If box is checked, well may not be used to explore for, lest, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: �Op �C� f, aro UD R �-f y r Samples req'd: Yes E]No[3' Mud log req'd: Yes E] No Lr�' Yt V/r?�-1/may., `/�"'� HzS measures: Yes No E] Directional svy req'd: Yes[xNo❑ �0 cO 0 a��t Spacing exception req'd: Yes ❑ No IJ/ Inclination -only svy req'd: Yes ❑ Nag/ V- Post initial injection MIT req'd: Yes ❑ No[?f APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: q.-7- 17 1 A1h { /Tl(/,7-' V , r /�Submit Form and Form 10-001 ( vised 11/2015) br�lllfl5lliNiM4 months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 7, 2017 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: RECEIVED APR 0 7 2017 A0GCC ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill a single lateral out of the KRU 2Z-29 (PTD# 188-129) using the coiled tubing drilling rig, Nabors CDR3-AC. ✓ The CTD objective will be to drill one lateral (2Z-291-1), targeting the Kuparuk C -sand interval. The work is scheduled to begin April 2017. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 2Z-291-1 - Detailed Summary of Operations - Directional Plans for 2Z-291-1 - Current wellbore schematic - Proposed wellbore schematic If you have any questions or require additional information, please contact me at 907-263-4321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska .-W Kuparuk CTD Laterals 2Z-291-1 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 Directional Plans for 2Z-2911...................................................................................................................6 (Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary .......................................................................................................................... 2 Proposed Well Schematic for 2Z-2911.....................................................................................................6 (Requirements of 20 AAC 25.005(c)(2))..................................................................................................................................................2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................3 7. Diverter System Information ..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8))..................................................................................................................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................ 4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................5 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 5 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................5 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))......................................................................................................................................................5 16. Attachments....................................................................................................................................6 Attachment 1: Directional Plans for 2Z-2911...................................................................................................................6 Attachment 2: Current Well Schematic for 2Z-29............................................................................................................6 Attachment 3: Proposed Well Schematic for 2Z-2911.....................................................................................................6 Page 1 of 6 April 7, 2016 PTD Application: 2Z -29L1 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed lateral described in this document is 2Z-291-1. The lateral will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) This lateral will target the C sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 2Z-291-1. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,600 psi. Using the maximum formation pressure in the area of 3,681 psi in 1 F-10 (i.e. 11.8 ppg EMW), the maximum potential surface pressure in 2Z-29, assuming a gas gradient of 0.1 psi/ft, would be 3,084 psi/See the "Drilling Hazards Information and Reservoir Pressure' section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 2Z-29 was measured to be 2,008 psi (8.4 ppg EMW) on 6/24/2015. The maximum downhole pressure in the 2Z-29 vicinity is to the south in the 1 F-10 injector at 3,681 psi (11.8 ppg EMW) from May of 2014. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) Wells on 2Z pad have injected gas, so there is a chance of encountering free gas while drilling the 2Z-29 laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 2Z-29 lateral will be losses to the formation. Managed pressure drilling (MPD) target pressure will be reduced in order to manage losses to the formation. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 2Z-29 lateral will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 April 7, 2016 PTD Application: 2Z-291_1 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 2Z -29L1 9881' 13000' 5862' 5863' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 115' 1640 670 Surface up into 3-1/2" tubing Existing Casing/Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded 0' 115' 0' 115' 1640 670 Surface 9-5/8" 36.0 J-55 BTC 0' 5184' 0' 3551' 3520 2220 Production 7" 26.0 J-55 BTC 0' 10383' 0' 6289' 4980 4320 Tubing 3-1/2" 9.3 J-55 EUE8rd 0' 9940' 0' 6007' 7180 7400 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based FloVis mud (8.6 ppg) — Drilling operations: Chloride -based FloVis mud (8.6 ppg) This mud weight will hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.4 ppg NaBr completion fluid in order to provide formation over -balance and wellbore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 2Z-29 lateral we will target a constant BHP of 11.4 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Page 3 of 6 April 7, 2016 PTD Application: 2Z-291_1 Pressure at the 2Z-29 Window (9886' MD. 5974' TVD) Usina MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 2Z-29 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize a single lateral to target the C sand to the north of the 2Z-29. A thru-tubing whip -stock will be set inside the 3-1/2" tubing at the planned kickoff point of 9886' MD to drill the single lateral. The 2Z -29L1 lateral will exit the 3-1/2" tubing at 9886' MD and TD at 13000' MD, targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 9881' MD. Pre -CTD Work 1. RU Slickline: Pull commingling sleeve and obtain SBHP and jewelry log. 2. Prep site for Nabors CDR3-AC and set BPV. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 2Z -29L I Lateral (C sand- north) r a. Mill Otis ported landing nipple at 9876' MD to 2.80" ID. b. Set top of whipstock at 9886' MD. c. Mill 2.80" window at 9886' MD. Page 4 of 6 April 7, 2016 Pumps On 1.5 bpm) Pumps Off —C -sand Formation Pressure 8.4 2610 psi 2610 psi Mud Hydrostatic 8.6 2672 psi 2672 psi Annular friction i.e. ECD, 0.08psi/ft) 478 psi 0 psi Mud + ECD Combined no chokepressure) 3150 psi overbalanced –540psi) 2672 psi overbalanced –62psi) Target BHP at Window 11.4 3542 psi 3542 psi Choke Pressure Required to Maintain Target BHP 392 psi 870 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 2Z-29 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize a single lateral to target the C sand to the north of the 2Z-29. A thru-tubing whip -stock will be set inside the 3-1/2" tubing at the planned kickoff point of 9886' MD to drill the single lateral. The 2Z -29L1 lateral will exit the 3-1/2" tubing at 9886' MD and TD at 13000' MD, targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 9881' MD. Pre -CTD Work 1. RU Slickline: Pull commingling sleeve and obtain SBHP and jewelry log. 2. Prep site for Nabors CDR3-AC and set BPV. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 2Z -29L I Lateral (C sand- north) r a. Mill Otis ported landing nipple at 9876' MD to 2.80" ID. b. Set top of whipstock at 9886' MD. c. Mill 2.80" window at 9886' MD. Page 4 of 6 April 7, 2016 PTD ADDlication: 2Z-291_1 d. Drill 3" bi-center lateral to TD of 13000' MD. e. Run 2-3/8" slotted liner with deployment sleeve from TD up to 9881' MD. 3. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Pull BPV. 2. Install gas lift design. 3. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. - Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running - The 2Z-29 lateral will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans Page 5 of 6 April 7, 2016 PTD Application: 2Z -29L1 - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 2Z -29L1 29510' Distance to Nearest Well within Pool Lateral Name Distance Well 2Z -29L1 824' 2Z-07 16. Attachments Attachment 1: Directional Plans for 2Z -29L1 lateral Attachment 2: Current Well Schematic for 2Z-29 Attachment 3: Proposed Well Schematic for 2Z -29L1 lateral Page 6 of 6 April 7, 2016 ConocoPhillips C a Project: Kuparuk River Unit Site: Kuparuk 2Z Pad kbmn=u Tm, x7 I -n ,F.sx n,eMv=Rxe WELLBORE DETAILS: 2Z-291_1 REFERENCE INFORA1AnON Parent Wellbore: 2Z-29 C.Wule INC Ram ,, W2Z-29, T. Nun Well: 22-29 u,.rc�x na3].anT i Te on MD:9800.00 VvOwl(1WI Refew=s 2Z29®109.muM OZ -M) Wellbore: 2Z -29L7 no nr9k: m.m• BI. NS) Rekverce: SIZOMN,M) Plan: Y-291_1 wpp2(M-2912Z-291-1) uoael�ac7cr4mi Mea=v Omn RNmerca 2Z -29®109.000M p2 -a) Cabkt. A ifficd Ni... CumAxe -1400 -1600 -1800 -2000 -2200 F-IVth n -- 1-291V,291.1 -z4Do - -2600 _ L_ _ e`O __—._ _.._ -2800 Ile FA�1/11 ;I AI.1 �P -3000 -3200 -3400 -3600 s -3800 -0000 -4200 — - -- -4400 -4600 IP -V IIF4e -4900 e1 _ InIVII'g= -5000 -5200 _ -5400 oosn str z -2Z -I 12Z.i2 — - -5600 N -5800 6000 -6200 — tl 2Z-29 @ 109.00usA`=_1dp" ---- ""' ---- " ow navy o- yaw mw nvw aeuu ovu0 oouu 6x VU muu 1100 14UU 76OU 7800 8000 8200 8400 8600 8800 9000 9200 West( -)/East(+) (200 usft/in) .p.. BAKHUGHES ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 2Z Pad 2Z-29 2Z -29L1 Plan: 2Z-29L1_wp02 Standard Planning Report 05 April, 2017 rias BAKER HUGHES ConocoPhil lips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kupamk 2Z Pad Well: 2Z-29 Wellbore: 2Z-2911 Design: 2Z-2911_wp02 I ConocoPhillips Rho Planning Report Site Kuparuk 2Z Pad BAKER HUGHES Local Co-ordinate Reference: Well 2Z-29 Latitude: 70° 19' 10.651 N TVD Reference: Mean Sea Level 529,130.68usft MD Reference: 2Z-29 @ 109.00usft (2Z-29) Slot Radius: North Reference: True Survey Calculation Method: Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 2Z-29 Well Position +N/S 0.00 usft Northing: 5,965,916.38 usft Latitude: 70° 19'4.634 N +E/ -W 0.00 usft Easting: 529,453.15 usft Longitude: 149° 45'40.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 2Z-291-1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2016 7/1/2017 17.52 80.93 57,537 Design 2Z-29L1wp02 Audit Notes: Version: Phase: PLAN Tie On Depth: 9,800.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (') 0.00 0.00 0.00 0.00 4/5/201710.33:17AM Page 2 COMPASS 5000.1 Build 74 Site Kuparuk 2Z Pad Site Position: Northing: 5,966,526.92 usft Latitude: 70° 19' 10.651 N From: Map Easting: 529,130.68usft Longitude: 149°45'49.854W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.22 ° Well 2Z-29 Well Position +N/S 0.00 usft Northing: 5,965,916.38 usft Latitude: 70° 19'4.634 N +E/ -W 0.00 usft Easting: 529,453.15 usft Longitude: 149° 45'40.513 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 2Z-291-1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2016 7/1/2017 17.52 80.93 57,537 Design 2Z-29L1wp02 Audit Notes: Version: Phase: PLAN Tie On Depth: 9,800.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (') 0.00 0.00 0.00 0.00 4/5/201710.33:17AM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Fed ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 2Z-29 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-29 @ 109.00usft (2Z-29) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-29 Survey Calculation Methods Minimum Curvature Wellbore: 2Z-2911 Azimuth System Design: 2Z-291-1_wp02 Rate Rate Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/ -S +E/ -W Rate Rate Rate TFO (usft) (I V) (usft) (usft) (usft) (°1100ft) (-1100ft) (-1100ft) (1 Target 9,800.00 5248 132.20 5,812.91 -4,967.61 5,154.82 0.00 0.00 0.00 0.00 9,886.00 52.48 132.63 5,865.29 -5,013.62 5,205.18 0.40 0.00 0.50 90.13 9,911.00 61.23 132.63 5,878.94 -5,027.7B 5,220.56 35.00 35.00 0.00 0.00 9,974.93 90.00 132.63 5,894.66 -5,069.29 5,265.65 45.00 45.00 0.00 0.00 10,124.93 103.83 65.84 5,874.32 -5,093.10 5,403.61 45.00 9.22 -44.53 285.00 10,325.00 93.88 334.85 5,835.24 -4,927.42 5,462.46 45.00 -4.98 -45.46 274.00 10,400.00 90.16 331.14 5,832.60 -4,860.66 5,428.44 7.00 4.96 -4.95 225.00 10,700.00 90.15 310.14 5,831.79 -4,629.99 5,239.26 7.00 0.00 -7.00 270.00 10,900.00 90.14 324.14 5,831.28 4,483.75 5,103.56 7.00 0.00 7.00 90.00 11,150.00 93.72 341.29 5,822.79 4,262.58 4,989.43 7.00 1.43 6.86 78.00 11,425.00 90.24 0.23 5,813.20 -3,992.58 4,945.55 7.00 -1.27 6.89 100.00 11,575.00 88.42 10.57 5,814.96 -3,843.46 4,959.65 7.00 -1.21 6.90 100.00 11,825.00 88.79 353.07 5,821.09 -3,594.64 4,967.57 7.00 0.15 -7.00 271.00 11,950.00 88.81 1.83 5,823.71 -3,469.91 4,962.02 7.00 0.01 7.00 90.00 12,375.00 86.49 31.51 5,841.55 -3,067.66 5,082.36 7.00 -0.55 6.99 95.00 12,625.00 86.95 13.99 5,855.98 -2,838.39 5,178.49 7.00 0.19 -7.01 271.00 12,825.00 89.44 27.77 5,862.30 -2,652.09 5,249.58 7.00 1.25 6.89 80.00 13,000.00 90.09 15.54 5,863.01 -2,489.75 5,314.04 7.00 0.37 -6.99 273.00 4/52017 10:33:17AM Page 3 COMPASS 5000.1 Build 74 Nal BAKER HUGHES Planned ConocoPhillips ConocoPhillips Planning Report Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 2Z-29 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2Z-29 @ 109.00usft (2Z-29) Site: Kuparuk 2Z Pad North Reference: True Well: 2Z-29 Survey Calculation Method: Minimum Curvature Wellbore: 2Z-291-1 Map Map Design: 2Z -29L1 wp02 Inclination Azimuth System Nal BAKER HUGHES Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N1 -S +El -W Section Rate Azimuth Northing Easting (usft) (9 (°) (usft) (usft) (usft) (usft) (°1100ft) (°) (usft) (usft) 9,800.00 52.48 132.20 5,812.91 -4,967.61 5,154.82 -4,967.61 0.00 0.00 5,960,969.52 534,626.91 TIP 9,886.00 52.48 132.63 5,865.29 -5,013.62 5,205.18 -5,013.62 0.40 90.13 5,960,923.71 534,677.44 KOP 9,900.00 57.38 132.63 5,873.33 -5,021.38 5,213.60 -5,021.38 35.00 0.00 5,960,915.99 534,685.90 9,911.00 61.23 132.63 5,878.94 -5,027.78 5,220.56 -5,027.78 35.00 0.00 5,960,909.61 534,692.88 End 35 cils, Start 45 dls 9,974.93 90.00 132.63 5,894.66 -5,069.29 5,265.65 -5,069.29 45.00 0.00 5,960,868.29 534,738.12 4 10,000.00 92.90 121.72 5,894.02 -5,084.41 5,285.58 -5,084.41 45.00 -75.00 5,960,853.25 534,758.11 10,100.00 102.43 77.27 5,880.00 -5,100.76 5,380.62 -5,100.76 45.00 -75.28 5,960,837.28 534,853.21 10,124.93 103.83 65.64 5,874.32 -5,093.10 5,403.61 -5,093.10 45.00 -81.54 5,960,845.03 534,876.17 5 10,200.00 103.67 31.03 5,855.93 -5,045.55 5,457.23 -5,045.55 45.00 -86.00 5,960,892.78 534,929.59 10,300.00 96.49 345.84 5,837.51 -4,950.83 5,470.83 -4,950.83 45.00 -94.52 5,960,987.55 534,942.82 10,325.00 93.88 334.85 5,835.24 -4,927.42 5,462.46 -4,927.42 45.00 -102.87 5,961,010.92 534,934.36 End 46 dls, Start 7 dls 10,400.00 90.16 331.14 5,832.60 -4,860.66 5,428.44 -4,860.66 7.00 -135.00 5,961,077.54 534,900.08 7 10,500.00 90.16 324.14 5,832.33 -4,776.24 5,374.96 -4,776.24 7.00 -90.00 5,961,161.74 534,846.27 10,600.00 90.15 317.14 5,832.06 -4,698.97 5,311.58 -4,698.97 700 -90.02 5,961,238.75 534,782.60 10,700.00 90.15 310.14 5,831.79 -4,629.99 5,239.26 -4,629.99 700 -90.04 5,961,307.44 534,710.01 8 10,800.00 90.15 317.14 5,831.53 -4,561.02 5,166.94 -4,561.02 7.00 90.00 5,961,376.11 534,637.43 10,900.00 90.14 324.14 5,831.28 -4,483.75 5,103.56 4,483.75 7.00 90.02 5,961,453.13 534,573.76 9 11,000.00 91.59 330.99 5,829.76 -4,399.41 5,049.97 -4,399.41 7.00 78.00 5,961,537.25 534,519.84 11,100.00 93.02 337.85 5,825.73 -4,309.34 5,006.85 -4,309.34 7.00 78.10 5,961,627.14 534,476.38 11,150.00 93.72 341.29 5,822.79 -4,262.58 4,989.43 -4,262.58 7.00 78.38 5,961,673.83 534,458.77 10 11,200.00 93.11 344.74 5,819.81 -4,214.85 4,974.85 -4,214.85 7.00 100.00 5,961721.49 534,444.01 11,300.00 91.85 351.63 5,815.48 -4,117.12 4,954.41 -4,117.12 7.00 100.21 5,961,819.13 534,423.18 11,400.00 90.56 358.51 5,813.38 -4,017.58 4,945.82 -4,017.58 7.00 100.50 5,961,918.63 534,414.21 11,425.00 90.24 0.23 5,813.20 -3,992.58 4,945.55 -3,992.58 7.00 100.65 5,961,943.63 534,413.83 11 11,500.00 89.33 5.40 5,813.49 -3,917.70 4,949.23 -3,917.70 7.00 100.00 5,962,018.52 534,417.22 11,575.00 88.42 10.57 5,814.96 -3,843.46 4,959.65 -3,843.46 7.00 99.98 5,962,092.78 534,427.35 12 11,600.00 88.45 B.82 5,815.65 -3,818.83 4,963.86 -3,618.83 7.00 -89.00 5,962,117.43 534,431.46 11,700.00 88.59 1.62 5,816.23 -3,719.36 4,973.13 -3,719.36 7.00 -88.95 5,962,216.93 534,440.34 11,800.00 88.75 354.82 5,820.55 -3,619.49 4,970.21 -3,619.49 7.00 -88.77 5,962,316.77 534,437.03 11,825.00 88.79 353.07 5,821.09 -3,594.64 4,967.57 -3,594.64 7.00 -88.61 5,962,341.62 534,434.29 13 11,900.00 88.80 358.32 5,822.66 -3,519.89 4,961.95 -3,519.89 7.00 90.00 5,962,416.33 534,428.38 11,950.00 88.81 1.83 5,823.71 -3,469.91 4,962.02 -3,469.91 7.00 89.89 5,962,466.31 534,428.25 14 12,000.00 88.51 5.31 5,824.B8 -3,420.03 4,965.13 -3,420.03 7.00 95.00 5,962,516.19 534,431.16 12,100.00 87.92 12.29 5,828.00 -3,321.32 4,980.41 -3,321.32 7.00 94.92 5,962,614.96 534,446.06 12,200.00 87.36 19.28 5,832.13 -3,225.23 5,007.57 -3,225.23 7.00 94.70 5,962,711.14 534,472.84 12,300.00 86.84 26.27 5,837.19 -3,133.20 5,046.20 -3,133.20 7.00 94.41 5,962,803.31 534,511.10 12,375.00 86.49 31.51 5,841.55 -3,067.66 5,082.36 -3,067.66 7.00 94.06 5,962,868.98 534,547.00 15 4/5201710.33:17AM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips ,fAFa. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 2Z Pad Well: 2Z-29 Wellbore: 2Z-2911 Design: 2Z-29L7_wp02 Planned Survey Vertical Dogleg Toolface Map Map Measured Section Rate TVD Below Northing Easting Depth Inclination Azimuth System +Nl-S (usft) (usft) 11) (9 (usft) (usft) 534,559.63 12,400.00 86.52 29.76 5,843.08 -3,046.19 534,603.40 12,500.00 86.68 22.75 5,849.02 -2,956.72 534,635.92 12,600.00 86.89 15.74 5,854.64 -2,862.52 534,642.23 12,625.00 86.95 13.99 5,855.98 -2,838.39 534,663.31 16 -2,674.38 7.00 79.77 5,963,262.83 534,701.35 12,700.00 87.87 19.16 5,859.37 -2,766.61 534,712.58 12,800.00 89.13 26.05 5,861.99 -2,674.38 534,744.17 12,825.00 89.44 27.77 5,862.30 -2,652.09 534,776.39 17 12,900.00 89.72 22.53 5,862.85 -2,584.23 13,000.00 90.09 15.54 5,863.01 -2,489.76 Planned TD at 13000.00 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 2Z-29 Mean Sea Level 2Z-29 @ 109.00usft(2Z-29) True Minimum Curvature 41WO17 10..33:17AM Page 5 COMPASS 5000.1 Build 74 Vertical Dogleg Toolface Map Map +El -W Section Rate Azimuth Northing Easting (usft) (usft) (°/100ft) V) (usft) (usft) 5,095.07 -3,046.19 7.00 -89.00 5,962,890.50 534,559.63 5,139.20 -2,956.72 7.00 -88.89 5,962,980.13 534,603.40 5,172.09 -2,862.52 7.00 -8848 5,963,074.46 534,635.92 5,178.49 -2,838.39 7.00 -88.08 5,963,098.61 534,642.23 5,199.86 -2,766.61 7.00 80.00 5,963,170.47 534,663.31 5,238.27 -2,674.38 7.00 79.77 5,963,262.83 534,701.35 5,249.58 -2,652.09 7.00 79.59 5,963,285.17 534,712.58 5,281.45 -2,584.23 7.00 -87.00 5,963,353.15 534,744.17 5,314.04 -2,489.76 7.00 -86.96 5,963,447.74 534,776.39 41WO17 10..33:17AM Page 5 COMPASS 5000.1 Build 74 ConocoPhillips FIVAra. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kupamk 2Z Pad Well: 2Z-29 Wellbore: 2Z-2911 Design: 2Z-29L1wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 2Z-29 Mean Sea Level 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NIS +E/ -W Northing Easting -Shape V) M (usft) (usft) (usft) (usft) (usft) 2Z-29L1_Faultl 0.00 0.00 5,848.00 -7702231,145,263.85 5,962,708.00 1,674,625.00 - plan misses target center by 1139796.34usft at 10300.00usft MD (5837.51 TVD, -0950.83 N, 5470.83 E) 5,960,730.00 - Polygon MD (5837.51 TVD, -4950.83 N, 5470.83 E) Point 1 5,848.00 0.00 0.00 5,962,708.00 1,674,625.00 Point 5,848.00 1.00 1.00 5,962,709.00 1,674,626.00 2Z-291-1_702 0.00 0.00 5,840.00 -9,689.791,145,608.08 5,960,722.00 1,674,977.00 - plan misses target center by 1140147.10usft at 10300.00usft MD (5837.51 TVD, -4950.83 N, 5470.83 E) 0.00 - Point 5,960,730.00 2Z-29 CTD Polygon 0.00 0.00 0.00 -9,680.481,145,274.09 5,960,730.00 - plan misses target center by 1139828.02usft at 10300.00usft MD (5837.51 TVD, -4950.83 N, 5470.83 E) - Polygon Point 0.00 0.00 0.00 5,960,730.00 Point 0.00 -90.40 -156.37 5,960,639.00 Point 0.00 -292.20 43.87 5,960,438.00 Point4 0.00 -331.39 349.75 5,960,400.02 Points 0.00 -113.14 548.62 5,960,619.02 Point 0.00 175.04 511.73 5,960,907.03 Point7 0.00 421.75 335.67 5,961,153.02 Point 0.00 735.81 68.86 5,961,466.00 Point 0.00 1,014.02 21.93 5,961,744.00 Point 10 0.00 1,544.98 47.99 5,962,275.00 Point 11 0.00 1,898.43 198.37 5,962,629.01 Point 12 0.00 2,911.22 539.33 5,963,643.03 Point 13 0.00 2,981.77 140.56 5,963,712.00 Point 14 0.00 2,489.01 65.64 5,963,219.00 Point 15 0.00 2,031.62 -103.14 5,962,761.00 Point 16 0.00 1,702.33 -295.44 5,962,430.99 Point 17 0.00 1,334.28 -292.86 5,962,062.99 Point 18 0.00 903.25 -298.53 5,961,631.98 Point 19 0.00 458.73 -175.24 5,961,187.99 Point 20 0.00 158.73 73.62 5,960,889.00 Point 21 0.00 0.00 0.00 5,960;730.00 1,674,643.00 1,674,643.00 1,674,487.00 1,674,688.01 1,674,994.01 1,675,192.01 1,675,153.99 1,674,976.98 1,674,708.97 1,674,660.95 1,674,684.92 1,674,833.90 1,675,170.85 1,674,771.85 1,674,698.87 1,674,531.90 1,674,340.91 1,674,344.94 1,674,340.96 1,674,465.98 1,674,715.99 1,674,643.00 2Z -2911T04 0.00 0.00 5,848.00 -7,703.221,145,262.84 5,962,707.00 1,674,624.00 - plan misses target center by 1139795.34usft at 10300.00usft MD (5837.51 TVD, -4950.83 N, 5470.B3 E) - Point 2Z -2917_T01 0.00 0.00 5,895.00 -9,791.991,145,400.66 5,960,619.00 1,674,770.00 - plan misses target center by 1139940.11usft at 10300.00usft MD (5837.51 TVD, -4950.83 N, 5470.83 E) - Point 2Z -2911T03 0.00 0.00 5,813.00 -8,740.621,145,080.75 5,961,669.00 1,674,446.00 - plan misses target center by 1139616.22usft at 10300.00usft MD (5837.51 TVD, -4950.83 N, 5470.83 E) - Point 2Z -291-1T05 0.00 0.00 5,863.00 -7,211.901,145,448.79 5,963,199.00 1,674,808.00 - plan misses target center by 1139980.20usft at 10300.00usft MD (5837.51 TVD, -4950.83 N, 5470.83 E) - Point 2Z-29L7_Faultl_M 0.00 0.00 0.00 -7,702.231,145,263.85 5,962,708.00 1,674,625.00 - plan misses target center by 1139B11.29usft at 10300.00usft MD (5837.51 TVD, 4950.83 N, 5470.83 E) - Rectangle (sides W1.00 H1,000.00 D0.00) Latitude Longitude 70° T36179 N 140° 33'49.776 W 70° 3' 16.976 N 140° 33'48.590 W 70° 3' 17.559 N 140° 33'58.048 W 70° T36171 N 140" 33' 70° 3' 16.290 N 140° 33' 54.931 70° 3'26,969 N 140° 33'59,479 70° 3'41.266 N 140° 33'42.392 W 70° 3'36.779 N 140° 33'49.776 W 4/52017 10:33: 17AM Page 6 COMPASS 5000.1 Build 74 ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 2Z Pad Well: 2Z-29 Wellbore: 2Z-2911 Design: 2Z-291-1_wp02 Casing Points Measured Vertical Depth Depth (usft) (usft) 13,000.00 5,863.01 23/8" Plan Annotations Hole Measured Vertical Depth Depth (usft) (usft) 9,80000 5,812.91 9,886.00 5,865.29 9,911.00 5,878.94 9,974.93 5,894.66 10,124.93 5,874.32 10,325.00 5,835.24 10,400.00 5,832.60 10,700.00 5,831.79 10,900.00 5,831.28 11,150.00 5,822.79 11,425.00 5,813.20 11,575.00 5,814.96 11,825.00 5,821.09 11,950.00 5,823.71 12,375.00 5,841.55 12,625.00 5,855.98 12,825.00 5,862.30 13,000.00 5,863.01 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 2Z-29 Mean Sea Level 2Z-29 Q 109.00usft (2Z-29) True Minimum Curvature Casing Hole Diameter Diameter Name (in) (in) 2.375 3.000 Local Coordinates +N/ -S +EI -W (usft) (usft) Comment -4,967.61 5,154.82 TIP -5,013.62 5,205.18 KOP -5,027.78 5,220.56 End 35 dis, Start 45 dis -5,069.29 5,265.65 4 -5,093.10 5,403.61 5 -4,927.42 5,462.46 End 45 cls, Start 7 dis -4,860.66 5,428.44 7 -4,629.99 5,239.26 8 -4,483.75 5,103.56 9 -4,262.58 4,989.43 10 -3,992.58 4,945.55 11 -3,843.46 4,959.65 12 -3,594.64 4,967.57 13 -3,469.91 4,962.02 14 -3,067.66 5,082.36 15 -2,838.39 5,178.49 16 -2,652.09 5,249.58 17 -2,489.76 5,314.04 Planned TD at 13000.00 res BAKER HUGHES 4/5201710.33: 17AM Page 7 COMPASS 5000.1 Build 74 Baker Hughes INTEQ HAN ConocoPhillips Travelling Cylinder Report BAKER HUGHES Company. ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Reference Site: Kuparuk 2Z Pad Site Error: 0.00 usft Reference Well: 2Z-29 Well Error: 0.00 usft Reference Wellbore 2Z -29L1 Reference Design: 2Z-29L7wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 2Z-29 2Z-29 @ 109.00usft(2Z-29) 2Z-29 @ 109.00usft (2Z-29) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference 2Z-29L1_wp02 -filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: 9,800.00 to 13,000.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,489.10 usft Error Surface: Elliptical Conic Survey Tool Program Date 4/5/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 200.00 9,800.00 2Z-29 (2Z-29) BOSS -GYRO Sperry -Sun BOSS gyro multishot 9,800.00 13,000.00 2Z-29L7_wp02(2Z-29L1) MWD MWD -Standard Casing Points Measured Vertical Casing Depth Depth Diameter (usft) (usft) Name (") 13,000.00 5,972.01 2 318" 2-3/8 Summary Site Name Offset Well - Wellbore - Design Kuparuk 1F Pad I F-02 - 1 F-02 - 1 F-02 IF -11 - IF -11 - 1F-11 Kuparuk 2Z Pad 2Z-07 - 2Z-07 - 2Z-07 2Z-08 - 2Z-08 - 2Z-08 2Z-12 - 2Z-12 - 2Z-12 2Z -12A- 2Z -12A - 2Z -12A 2Z-13 - 2Z-13 - 2Z-13 2Z-13 - 2Z -13A - 2Z -13A 2Z-13 - 2Z-13AL7 - 2Z-13AL1 2Z- 13 - 2Z-1 3AL1 Pat -2Z-13AL1 PB1 2Z-14 - 2Z-14 - 2Z-14 2Z-23 - 2Z-23 - 2Z-23 2Z-23 - 2Z -23A - 2Z -23A 2Z-23 - 2Z-23AL1 - 2Z-23AL7 2Z-23 - 2Z-23AL7-01 - 2Z-23AL1-01 2Z-29 - 2Z-29 - 2Z-29 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 10,270.00 8,085.00 1,174.07 12,322.95 8,853.00 824.38 9,899.97 9,900.00 0.60 Hole Diameter ("1 3 No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) 382.47 793.14 Pass- Major Risk Out of range 277.20 548.53 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 5.79 -2.41 FAIL - Major Risk Offset Design Kuparuk 1 F Pad - 1 F-02 - 1 F-02 - 1 F-02 opset sae error. 0.99 usft Survey Pmgram: 200. Rule Assigned: saint Risk Parent Well Error: 9.00 waft Reference Oftxt semi Major Avis Measured Vertical Measured Vertleal Reference Offset Toolface♦ Parset Wellbore Cerare Casing- Centre to No Go Allowable Warning Depth Depth Depth Depth Aeimutb B(S +Pw ROM sire Centre Den.rxe Deviation (usft) (pan) used NeR) (uafl) (gaff) (') (usft) (use) l"1 lueft) loan) loan) 1025060 5.954.16 7.52598 5,96972 120.95 52.14 98.14 -5,262.83 6,92263 211116 1,472.88 323.49 1,15940 Pass - Major Risk 10,250.00 5,954.16 7,55000 5,984.21 120.95 52.45 9879 -5,248,72 6,907.92 241116 1.456.10 32198 1,141.37 Pass - Major Risk 10,250.00 5,954.16 7,575.00 5,998.69 12095 52.76 99A5 -5.234.59 8,893.25 2-11116 1.43959 32446 1,123.62 Pass - Major Risk CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 4/52017 9:43:524M Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Project: Kuparuk River Unit Site: KuparukY Pad xunmlxionm xdn 1e.araioxm6rnsr ws,aaflJ4 WELLBORE DETAILS: 2Z-291_1 REFERENCE IufoRFMTox parent Wellbore: 2Z-29 rortnem lxAlanemee'. W02Z-2s, Tme tan Well: 2Z-29 exervW sn37AM, Te on MD'. 9600.00 va�od nvo719Mercms'. raean S. .0 Wellbore: 2Z-291_1 op A,gl.: eosa Easting S. - CVS) Rebmrce: ant-(9o9u,ao9E1 Plan: Y-281-1_vry02 (Y-28lY-291-1) oaa. �nxn Mm[ a6GMmfa 0.00 0.00 lkeiiM NoR Ria.a.. 2Z49@10900ae V-291 5948461.17 539924.15 70° C.k;t:a on ebmd: "m cp Ovmme _C t-' Mean', -1800 .2100 -2400 -2'100 .3000 -3300 -3600 0 X3900 rzoo 0 -4500 t40 5 - 80 0 -5100 -5400 -5700 -6000 EARS BAKER HUGHES WELL DETAILS: 2Z-29 +N/ -S +EI -W Northing Easting Latitude Longitude 0.00 0.00 5948461.17 539924.15 70° 16' 12.472 N 149° 40'37.662 W Seo MD Inc Azi TVDSS +N/ -S +E/ -W Dleg TFace VSect Annotation 1 9800.00 52.48 132.20 5812.91 -4967.61 5154.82 0.00 0.00 -4967.61 TIP 2 9886.00 52.48 132.63 5865.29 -5013.62 5205.18 0.40 90.13 -5013.62 KOP 3 9911.00 61.23 132.63 5878.94 -5027.78 5220.56 35.00 0.00 -5027.78 End 35 d1s, Start 45 cls 4 9974.93 90.00 132.63 5894.66 -5069.29 5265.65 45.00 0.00 5069.29 4 5 10124.93 103.83 65.84 5874.32 -5093.10 5403.61 45.00 285.00 -5093.10 5 6 10325.00 93,88 334.85 5835.24 -4927.42 5462.46 45.00 274.00 -4927.42 End 45 d1s, Stars 7 dls 7 10400.00 90.16 331.14 5832.60 -4860.66 5428,44 7.00 225.00 4860.66 7 8 10700.00 90.15 310.14 5831.79 4629.99 5239.26 7.00 270.00 -4629.99 8 9 10900.00 90.14 324.14 5831.28 4483.75 5103.56 7.00 90.00 4483.75 9 10 11150.00 93.72 341.29 5822.79 4262.58 4989.43 7.00 78.00 4262.58 10 11 11425.00 90.24 0.23 5813.20 -3992.58 4945.55 7.00 100.00 -3992.58 11 12 11575.00 88.42 10.57 5814.96 -3843.46 4959.65 7.00 100.00 -3843.46 12 13 11825.00 88.79 353.07 5821.09 -3594.64 4967.57 7.00 271.00 -3594.64 13 14 11950.00 88.81 1.83 5823.71 -3469.91 4962.02 7.00 90.00 -3469.91 14 15 12375.00 86.49 31.51 5841.55 -3067.66 5082.36 7.00 95.00 -3067.66 15 16 12625.00 86.95 13.99 5855.98 -2838.39 5178.49 7.00 271.00 -2838.39 16 17 12825.00 89.44 27.77 5862.30 -2652.09 5249.58 7.00 80.00 -2652.09 17 18 13000.00 90.09 15.54 5863.01 -2489.75 5314.04 7.00 273.00 -2489.75 Planned TD at 13000.00 _C t-' Mean', -1800 .2100 -2400 -2'100 .3000 -3300 -3600 0 X3900 rzoo 0 -4500 t40 5 - 80 0 -5100 -5400 -5700 -6000 EARS BAKER HUGHES West( -)Bast(+) (300 usft/in) 530D _.-.. Plannt 2;:.29P; I To a 13M .29L I 00 -07/22 07 -29L1 T05_. ......-. ...: :- -1 .. 'Ib F-1 I/ F -II 5400 22 1 - 3-_.. 1 ..1 1 _........ - I 0 2Z-291_1 Fa tl 2Z-291 1 M2 .6 I'M_.. ...... ... End JS dlz,Stan rF-D IF -o 27 191 1- ]ds TIPj :.. ..__,____. i�Y-29 Z-29 K P End 5,1k, mrt45d1s 5500 West( -)Bast(+) (300 usft/in) 530D 5400 5500 I I 5600 °� m N 5700 N .3 ' En 35 dis Stan 5 dis Pla ned at 13 W.00 5800 5900 7 8 9 10 12 13 14 i' is 6000 End 5dis, tan? is 6100 6200 -29/2 -29 IF -02! F-02 2Z-29 -Fatltl 6300 ea L 8 8 8 8 8 S 8 8 8 8 8 8 8 8 8 8 8 8 8 0 8 S o 8 8 0 0 0 0 8 8 8 8 0 Vertical Section at 0.000 (100 usft/in) 1 Al -k KUP PROD 2Z-29 ConocoPhillips Aa6I(a Inti Wall Attribute. WellEere APIIWFI F1eltl Hame We11Gore 51alus 500292188100 KUPARUK RIVER UNIT PROD Max An-(.- TO nG 11 MG(%KB) PCIBM I%KR) 61.88 6.600.00 10°4570 Annalalion EnE Dale KBGF N RIB RaIbse ESM Land WO: 6171 &20/1989 Comment H25(ppm) Gab SSSV: TROP -2s. tiarzOvl03935AM Venivalavaemeac ecWel Rnn"Ylon Gep11, IXKB) end Gale Last Tag'. SLIA 10.0680 1/22)2016 Mnobllon Lul Moa By Ena Gale Rev Reason'. REPLACE SLEEVE ppm Von 21812017 RANDER.3v1 codpuiTdRi 4i.o.lisu SPFETY VLV; Li98A GAS LIFE; 31]50 suRFACE:4oas,1e4.A- GASLmT:S)w.a -ASLm1;E121,3 GAS LIF; 71o11 GASUFT;6ozz1 cA6 LIFT', a,iA31 GAS LIFT', 9430 B GAS LIFT', 943]6 ,an S M., PACKERIe89%0 PapoecrwN; u.Tasz RAq 97920 IPERF', A1S2S,Uam0-1 NIPPLE; 9.0780 SLEEVE; 98763 LOGT0R:8.91f i PACIIER;9SL91 S."AleR APPLE: e.aze7 spa: e.a3a1 PPERF', 10,003.0.10AZZA- RPFRF; 1X,o3d.G19osvo__ APERn lo.O%AdopBOA`� RPFRF:19ost 6190e5A� IPERF', 10.0800-10,9304 IPERF;10.134.0.10.148.0- MEde lli.154.0.10.168.0� PROpUCTION; 33 A-10.388.9 -. asmg tongs Casing OP==.ipnnn oG pnl mpn) rop �flKa) Set depth(%KB) sel Gepm lrvG)... iNVI-W(...Gram Top Tl d CONDUCTOR 16 15.062 41.0 115.0 115.0 62.50 H-00 WELDED Gazing Oescnplbn OG lint IB (in) Top IXKB) SN GepN (XKB) gel Gepm )TVG)... wvLen p... Ghee Top Tnrma SURFACE 9518 8921 40.1 5,184.0 J, 5513 36.00 J-55 BTC mem E. 'g;flSet GepNt INGI... WULen II... -nae Top Taman OG (n) 10 (in) Top l%KB) Bel Oeplh "'382 PRODUCTION ] 6276 33.0 10,382.9 6.288.9 2600 J-55 BTC Tubing Strings mmog Rsvapnon smog Ma... lG (in) Top I%KE Set oapm lX.. Sol Depth "T) l.- wl6em) Graee RIE-no.lon TUBING 31/2 2.992 31.1 9.9)9] 6,00].1 9.30 J-55 EUEBN Completion Details Nominal lG Top lrcKToplrvGl ( Top malIME Lee Can Ila) 31 1 31 1 0.088 HANGER FMC GEN 4 TUBING HANGER 3.500 31 31 1 1.7980 1°7OOP 3702 SAFETY VLV CAMCO TROP -1A SAFETY VALVE 2.812 9,6844 5.853.8 5504 PER AVA PER 3900 9,8980 5,8614 54.74 PACKER AVA RHS -XL RETRIEVABLE PACKER 3.000 9,]]40 59082 53.06 BUwSTRINGS CARBIDE BLAST RINGS (3) 3867 9,876.3 5,9686 52.48 NIPPLE OTIS PORTED LANDING NIPPLE 2.310 9,911,1 5,989.6 52.42 LOCATOR TRW LOCATOR 3.000 9,913.1 5,990.8 5240 PACKER TIW SSBB PERMANENT PACKER 4000 9,916.8 5,993.1 5238 SBE SEAL BORE EXTENSION 4000 9,929.7 6.00101 PLE VS/ NO GO PROFILE 2635 9,939.1 6,0667 1 5225 SOS AVA SHEAR OUT SUB 2.992 ether In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Tap'%KSI%Ka) np(TVD of°l c Dna com Ran Data Io6n1 98]6.3 59686 5248 SLEEVE OTIS COMMINGLING SLEEVE 12/22/2016 2.310 Perforations & Slots Top INKS),792 BonOnes).850. Top lTwl Beam (XKB) (rt IDna Gab Elio, °enc (sn1) q Type Com 9,7920 9.850.0 5.917.0 5,9526 Cd, UNtT B. ZZ -29 2/1931989 12.0 PERE 120 pha: 5' San,mn Sequensei'IBIOmniK 10.002.0 101022.0 6,0454 6,057.7 A45. 2Z-29 112931990 BO APERF BD deg. phasing; 21/8" Dyna Ship 10,0340 10,051.0 6,065.1 6,075.7 A4,2Z-29 1012311992 CO RPERF 180deg.yhasing: 21/8" BI Wire 11,0340 10.080.0 8.085.1 6,0917 A -0,2Z-29 12/18/1989 8.0 APERF 60deg. phas'ng;212" AD.S Silva, 10,0510 10,DB5.0 6,075.7 6,096.9 A-0,22-29 102211992 40 RPERF 180 deg. phasing; 2118" BI WA I1 10,0800 10,090.0 8.0937 6,1000 A-0, 22-29 21931989 80 IPERF 120 d eg, ph ase; 5' Sequential OmniK 10.134.0 10,146.0 6,1275 6,135.1 A-3 2Z-2 211&1989 8.0 IPERF 120 deg, phase; 5' Sequential Omni K 10,1540 10.16G0 6.140.1 6,1476 A -3,2Z-29 2/1811989 801PERF 1 120 deg.,hase5' Sequential Omni K Stimulations & Treatments Roppanl nes,mmn 1,a, I PmpWm In --memo ilei e W812001 Stimulations & Treatments Min Tap Men Blm GepN (flKBI Depll, l%KB Top(TVDI BM [LVD) l%K0) (M1KB) Blg% Gale Sli mnreal Flula Vol Clean 1ump(fl46 I Vol Shirty (e4') 9,]920 9,8500 5917.0 5.952.4 1 2182001 Mandrel Inserts at a Nn Top(ND) Valve -ol, Papal- TRORun Top(%KIN (flKB) Make Model M(in) Sery Type Type (In) (pail Run Ga4 Lmn 1 3,235.0 2.548.0 CAMCO KBUG 1 GAS LIFT GLV BK 0.156 1,350.0 W912001 2 5,709.6 3,826.5 CAMCO KBUG 1 GAS LIFT GLV SK 0.188 1,3320 Widago1 3 6.7273 43375 CAMCO KBUG 1 GAS LIFT OV BK 0.188 60 1212012007 4 7,4077 4,675.3 CAMCO KBUG 1 GAS LIFT OMY BK 0.000 0.0 12612001 5 8,027.1 4,999.5 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 221)1989 6 8,743.1 5,3714 CAMCO KBUG 1 GAS LIFT DMY BK 0.000 0.0 1242001 7 96305 5,7160 CAMCO KBUG 1 GAS LIFT DMV BK 0.000 0.0 221)1989 8 9.6336 5.824.9 CAMCO MMG-2 1112 GAS LIFT DMY RK 0.000 D.D 1/182001 9 9]35.2 5,883.1 CAMCO KBUG 1 PROD EOUA BK 0000 0.04211994 Close Od MY Notes: General &Safety Ena pain 112932001 NOTE. LEAK OETECtED IN FIRST JOINT ABOVE LOWER PACKER 11142011 NOTE. View BOhepmam lAlaSka SMeme11e9.0 22.29 Proposed CTD Schematic @ 115' '36# J-55 @ 5184- C -sand perfs 9792'- 9850' MD KOP @ 9886' MD A -sand perfs 10002'- 10166' MD 7" 26# J-55 shoe @ 10383' MD 3-1/2" Cameo TRDP-1A SSSV @ 1796' MD (2.812" min ID) 3-1/2" 9.3#J-55 EUE 8rd Tubing to surface 3-1/2" Cameo gas lift mandrels @ 3235', 5709', 5727, 7408', 8027', 8743', 9431', 9634' MD 3-1/2" AVA PBR @ 9684' MD AVA RHS -XL Retrievable Packer @ 9698' MD 3-1/2" Cameo production mandrel @ 9735' MD 3-1/2" Otis ported landing nipple @ 9876' MD (2.75 -'min ID) " Mill to 2.80" prior to CTD Otis commingling sleeve @ 9876' MD (2.310 min ID) - Pull during Pre -CTD diagnostics TIW Locator@ 991 VMD TIW SS -BB permanent packer @ 991 VMD SBE @ 9916' MD Otis XN Nipple w/ no go profile @ 9930' MD (2.635" min ID) 3-1/2" tubing tail @ 9939' MD 2Z -29L1 wp02 TD 13,000' MD Top of Liner (61-9881' MD Loepp, Victoria T (DOA) From: Herring, Keith E <Keith.E.Herring@conocophillips.com> Sent: Friday, April 07, 2017 1:04 PM To: Loepp, Victoria T (DOA); Bettis, Patricia K (DOA) Subject: KRU 2Z-29 (# CTD Sidetrack Good afternoon Victoria and Patricia, Due to the difficulties that Nabors CDR3 is having on the KRU 31VI-14 well and the weather not allowing us to prep the KRU 1C-23 well, I submitted a PTD application for the 2Z-29 CTD project today. CDR3 will most likely be moving to 2Z-29 this weekend with the potential to spud the well on 4/10/17, so I request expedited approval of this drilling permit. I am sorry to rush you like this, but events have conspired against us. Thanks for your time and help on the matter. Keith Herring CTD Engineer 907.263.4321 (Office) 907.570.2410 (Mobile) 700 G Street, ATO — 664 Kehh.El a Conocoph i I h" wm ConocoPhillips Alaska TRANSMITTAL LETTER CHECKLIST WELL NAME: /�AU 02Z PTD: d/ 7 -ULIS V/Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: ��lu4WL1C 2vE,� POOL: 4kA&1tJ< k'Vbf, 440/A4 Qi/ Check Bos for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. %$� " JZ9 API No. 50- 0),9-�/% -00 -00 . (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- _-_) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (ComQany Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST PTD#: 21 Administ Appr PKB Engineer Appr VTL Geology Appr PKB 4RUK RIV OIL -490100_ Well Name: KUPARUKRY---NIT 2Z-291_1 — Program DEV Well bore seg d❑ n 70450 Company CONUUUf-HILLw> Nu b" 1Nu_ — _ _ _ Initial Class/Type DEV/ PEND__GeoArea 890 _ Unit 11160 On/Off Shore On Annular Disposal ration 17 Nonconven, gas conforms to AS31.05.0300.1.A),0.2.A-D) .... NA 1 Permit fee attached_ _ _ NA 2 Lease number appropriate Yes ADL0025646,.Surf Loc; ADL0025653 3 Unique well. name and number _ _ Yes KRU 2Z-291_1 _ 4 Well located in.a defined pool Yes KUPARUK RIVER, KUPARUK.RIV OIL.- 490100,_ governed. by Conservation. Order No. 432D.. _ 5 Well located proper distance from drilling unit boundary Yes CO 432D contains no spacing restrictions with respect to drilling unit boundaries. 6 Well located proper distance from other wells Yes CO 432D has no interwell spacing restrictions, 7 Sufficient acreage available in drilling unit Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party Yes Wellbore. will be more than 500' from an external property line where ownership or landownership_ changes... 10 Operator has. appropriate bond in force Yes Date 11 Permit can be issued without conservation order Yes 4/7/2017 12 Permit can be issued without administrative. approval Yes 13 Can permit be approved before 15 -day wait Yes 14 Well located within area and. strata authorized by Injection Order # (put. 10# in. comments) (For. NA 15 All wells within 114. mile. area of review identified (For service well only)... NA 16 Pre -produced injector; duration of pre -production less than 3 months (For service well only) NA 18 Conductor string provided NA Conductor set in KRU 2Z-29 'ng 19 Surface casing protects all. known USDWs NA Surface casing set in KRU 2Z-29 20 CMT. vol. adequate to circulate on conductor & surf. csg NA. _ Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA _ 22 CMT will cover all known productive horizons -.. No. Productive interval will be completed with. slotted liner 23 Casing designs adequate for C, T, B &. permafrost Yes 24 Adequate tankage or reserve pit Yes _ Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has.a 10403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet. regulations NA Date 28 Drilling fluid program schematic & equip list adequate Yes Max formation pressure is 3681 psig(11..8 ppg EMW ),' will drill w/ 8,6. ppg and maintain overbal w/ MPD 4/7/2017 29 BOPEs,. do they meet regulation Yes 30 BOPE press rating appropriate; lest to (put psig in comments) Yes MPSP is 3084 psig; will test BOPS to 3600 psig 31 Choke manifold complies w/API. RP -53 (May 84).. Yes 32 Work will occur without operation shutdown _ Yes 33 Is presence of 1-12S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Wells on 2Z -Pad are. H2S-bearing. H2S measures required. 36 Data presented on potential overpressure zones Yes Max. potential_ reservoir pressure is 11.8 ppg EMW; will be drilled using 8.6 ppg mud and MPD technique. Date 37 Seismic. analysis of shallow gas. zones. NA 4/7/2017 38 Seabed condition survey (if off -shore) NA 39 Contact name/phone for weekly_ progress reports [exploratory only) NA Onshore development lateral to be drilled. Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date