Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-053DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170530 Well Name/No. KUPARUK RIV UNIT 3M.27A Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-01.00 MD 14994 TVD 6191 Completion Date 9/23/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log No Samples No / Directional Survey Yes t/ DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start StopReceived CH Comments ED C 28655 Digital Data 12580 14994 _ 10/13/2017 Electronic Data Set, Filename: 3M -27A GAMMA RES.Ias ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A 2MD Final.cgm ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A 5MD Final.cgm' ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A 5TVDSS Final.cgm' ED C 28655 Digital Data ?10/13/2017 Electronic File: 3M -27A 2MD Final.pdf . ED C 28655 Digital Data ?10/13/2017 Electronic File: 3M -27A 5MD Final.pdf ED C 28655 Digital Data 1510/13/2017 Electronic File: 3M -27A 5TVDSS Final.pdf ' ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A EOW - NAD27.pdf. - ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A EOW - NAD27.txt ' ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A Final Surveys TO - 14994.csv ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A Final Surveys TO ' 14994.x1sx ED C 28655 Digital Data - 10/13/2017 Electronic File: 3M -27A Survey Listing.txt ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A Surveys.txt ' ED C 28655 Digital Data 10/13/2017 Electronic File: 3M- 27A_25_tapescan_BHI CTK.txt ED C 28655 Digital Data 10/13/2017 Electronic File: 3M- 27A_5_tapescan_BHI_CTK.bd - ED C 28655 Digital Data 10/13/2017 Electronic File: 3M-27A_output.tap ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A 21VID Final..tif* ED C 28655 Digital Data 10/13/2017 Electronic File: 3M -27A 5MD Final.tif• AOGCC Page I of 2 Thursday, December 28, 2017 DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170530 Well Name/No. KUPARUK RIV UNIT 310-27A Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-01-00 MD 14994 TVD 6191 Completion Date 9/23/2017 ED C 28655 Digital Data Log C 28655 Log Header Scans ED C 28680 Digital Data ED C 28680 Digital Data Log C 28680 Log Header Scans Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report Y Production Test Informatio�Y A Geologic Markers/Tops y r/ COMPLIANCE HISTORY Completion Date: 9/23/2017 Release Date: 4/25/2017 Description Comments: Interval Start Stop Completion Status 1 -OIL Current Status 1 -OIL UIC No 10/13/2017 Electronic File: 3M -27A 5TVDSS Final.tif ' 0 0 2170530 KUPARUK RIV UNIT 3M -27A LOG HEADERS 10/16/2017 Electronic File: 3M -27A EOW - NAD27.pdf 10/16/2017 Electronic File: 3M -27A EOW - NAD27.lxt 0 0 2170530 KUPARUK RIV UNIT 3M -27A LOG HEADERS Sample Set Sent Received Number Comments Directional / Inclination Data Mechanical Integrity Test Informations Y�/6) Daily Operations Summary Date Compliance Reviewed By: AOGCC Comments Page 2 of 2 Mud Logs, Image Files, Digital Data Y 16) Core Chips Y lr!) Composite Logs, Image, Data Files QY Core Photographs YM NA Cuttings Samples Y Laboratory Analyses Y Date: - ._ Thursday, December 28, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 2oAAC25.105 20AAC25A10 GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 1b. Well Class: Development Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 9/23/2017 14. Permit to Drill Number/ Sundry: 217-053 ' 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Dale Spudded: 8/222017 15. API Number: 50-029-22637-01-00 4a. Location of Well (Governmental Section): Surface: 892' FNL, 1574' FEL, Sec 25, T1 3N, R8E, UM Top of Productive Interval: 3630' FNL, 919' FEL, Sec 22, T1 3N, R8E, UM Total Depth: 1781 'FNL, 259' FEL, Sec 22, T1 3N, R8E, UM 8. Date TO Reached: 8252017 16. Well Name and Number: KRU 3M -27A 9. Ref Elevations: KB: 68 , GL: 27 BF: 17. Field / Pool(s): Kuparuk River Field/Kuparuk Oil Pool , 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ADL 25523, ADL 355032, ADL 25522, 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 506294 y- 6016605 Zone- 4 TPI: x- 496387 y- 6019147 Zone- 4 Total Depth: x- 497045 y- 6020995 Zone- 4 11. Total Depth MDf VD: 14994' MD/6191' TVD • 19. DNR Approval Number: 931813000 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MDfrVD: 1795/1725 5. Directional or Inclination Survey: Yes (attached) No LJ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: 12713' MD/ 6211' TVD 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary RECEIVED GR/Res OCT 2 0 2017 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CE AMOUNT PULLED TOP BOTTOM TOP BOTTOM 16" 62.58 H-40 Surf 121' Surf 121' 24" 200 CF 9.625" 40 L$0 Surf 5996' Surf 3465' 1300 sx AS III Lead, 690 sx Class G 1225" Tail 7" 26 L-80 Surf 13006 Surf 6432' 8.5" 200 sx Class G 23/8 4.7 L-80 13231' 14994' 6252' 6191' 3" Slotted Liner 24. Open to production or injection? Yes Q No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 13231'-14994' MD / 6252'-6191' TVD Slotted Liner / 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3-1/2" 12598' 12498 MD/6052 TVD 12571 MD/6105 TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes No Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 924/2017 Method of Operation (Flowing, gas lift, etc.): Gas Lift Date of Test: 10/212017 Hours Tested: 6.8 Production for Test Period Oil -Bbl: 1070 Gas -MCF: 594 Water -Bbl: 521 Choke Size: 173 Gas -Oil Ratio: 555 Flow Tubing Press. 263 Casing Press: 1315 Calculated 24 -Hour Rate -10,3778 Oil -Bbl: Gas -MCF: 2098 Water -Bbl: 1838 Oil Gravity - API (corr): 20 orm -i0-ao7 Revised orzU1 r V7 L !V/Z i / i � CONTINUED ON PAGE 2 Submit ORIGINIAL onl /�(pl�l7 RBDMS L �- OCT 2 4 2017 '� 28. CORE DATA Conventional Corals): Yes ❑ No ❑� Sidewall Cores: Yes ❑ No Q if Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1795 1725 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 12713 6211 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kuparuk C TD 14994 6191 (Kuparuk D Sand) Formation at total depth: Kuparuk D 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematics Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: J. Ohlinger Contact Name: Keith HerringO Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herrin @cop.com Authorized Contact Phone: 2634321 Signature: Date: /O l L /% INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item ta: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3M-27 Final CTD Schematic i6" 62# H-40 shoe (a 121' MD 9-5/8" 36# L-80 shoe @ 5996' MD C -sand perils 12,696' -12,708' MD 12,724'- 12,744'MD KOP @ 12,712' MD FA -sand perfs 12,764' - 12,784' MD r' 26# L-80 shoe @ 13,006• MD 3-12" Camco DS Landing Nipple @ 495' RKB (ID = 2.875") 3-12" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2•' Camco MMG gas lift mandrel @ 3543', 6918', 9762', 11,666', 12,378' RKB Baker CMU Sliding Sleeve (4112,433' RKB (2.813" ID X -profile) Baker 80-40 PBR @ 12,485' RKB (4.00" ID) Baker FHL packer @ 12,498' RKB (2.90" ID) X Nipple @ 12,515' RKB (2.813" ID) (12504' PDC) Baker Po -Boy Overshot @ 12,533' RKB (12522' PDC) Camoo W Nipple @ 12,550' RKB (2.812" ID) (12539' PDC) Baker PBR @ 12,556' RKB (3.00" ID) Baker FHL packer @ 12,571' RKB (3.0" ID) (12560' PDC) 3-12" Camco D nipple @ 12,588' RKS (1257r PDC) (Milled out to 2.80" ID) 3-1/2" tubing tail @ 12,598' RKB (12587' PDC) =water soluble tracer pups = all soluble tracer pups 31,147AI2411 TO=15380' MD 2-3/8'sottea liner w/ an roW aluminum billet TOL =12817 MD, BOL=15384 MD Oil Tracer at 15280' MD (SN: T-740) WaIer Traceret 15273' MD(SN. T-912) 13232' MD, SOL= mr at 14844' MD fl inum billet 14882' MD . Operations Summary (with Timelog uepths) 3M-27 • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log q Start Time End Time Dur(hr) Phase op code Acthity CodeTime P-T-X Operation Slat Depth (flKa) End Depth (flKa) 8/5/2017 8/5/2017 3.00 MIRU MOVE MOB P Trucks on location, PJSM w/crews, 0.0 0.0 18:00 21:00 follow pre-move check list, pull pit module away from drlling Sub, pull - drilling Sub off of well, install jeeps, load shop onto 12' wide trailer. 8/5/2017 8/5/2017 2.25 MIRU MOVE MOB P Start moving to 3M-pad crossing over 0.0 0.0 21:00 23:15 rig mats 8/5/2017 8/6/2017 0.75 MIRU MOVE MOB P On 3M-pad, remove jeeps, prep well 0.0 0.0 23:15 00:00 for rig. 8/6/2017 8/6/2017 4.00 MIRU MOVE MOB P Spot modules over well 27, retrieve 0.0 0.0 00:00 04:00 shop and halfway house. 8/6/2017 8/6/2017 2.00 MIRU WHDBOP RURD P Follow post move check Isit, setting 0.0 0.0 04:00 06:00 stairs, spotting in dumpsters, hooking up PUTZ 816/2017 8/6/2017 2.50 MIRU WHDBOP NUND P Nipple up BOPE's, fuesable istalled, 0.0 0.0 06:00 08:30 called CPF3 Board, COMMS up after 07:00, prep for BOP test, working on MP #2 replacing pulsation dampener 8/6/2017 8/6/2017 1.50 MIRU WHDBOP NUND P PJSM, fluid pack lines, BOP shell test, 0.0 0.0 08:30 10:00 C/O leaking O-ring riser, repeat shell test to 4200 psi, passed. "` Rig Accepted 09:00 hour 8/6/2017 8/6/2017 9.00 MIRU WHDBOP ROPE P Begin BOPE test, witness waived by 0.0 0.0 10:00 19:00 Chuck Scheve, test 10, greased B4 & 8, retested, found bleeder 4 leaking since beginning of test (not part of WC, will need replaces), greased R3 was fail/pass. Test IRV iron, leaking near pressure bulkhead, LOTO reel to troubleshoot IR iron 8/6/2017 8/612017 1.50 SLOT WELLPR MILL P PT PDL's and tiger tank line, sim-ops, 0.0 0.0 19:00 20:30 remove bulkhead, repair failed o-ring, re-install bulkhead. 8/6/2017 8/6/2017 2.00 SLOT WELLPR MILL P Valve crew on locaiton, load 0.0 0.0 20:30 22:30 equipment, MU extentions, PT lubricator, pull BPV 8/6/2017 8/6/2017 1.00 SLOT WELLPR MILL P Retest and chart inner reel iron, good 0.0 0.0 22:30 23:30 test 8/6/2017 8!712017 0.50 SLOT WELLPR MILL T PJSM, PU/MU BHA# 1 0.0 62.4 23:30 00:00 8/712017 8/7/2017 0.75 SLOT WELLPR MILL T Finish MU milling BHA# 1, with fumed 62.4 62.4 00:00 00:45 down bi-center bit 2.98", surface test tools, stab INJH 8/7/2017 8/712017 1.75 SLOT WELLPR MILL T RIH, taking freeze protect returns out 62.4 9,098.0 00:45 02:30 side to tiget tank. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Set down 2k CTSW, PUH circulate 9,098.0 7,940.0 02:30 03:30 milling fluid around, re-boot BHI computers, PUH for Tie In. 8/7/2017 8/7/2017 0.55 SLOT WELLPR MILL T Log formation for tie in/depth control 7,940.0 8,042.0 03:30 04:03 plus 18.0' 8/7/2017 8/7/2017 0.20 SLOT WELLPR MILL T RIH, 8,042.0 9,030.0 04:03 04:15 8/7/2017 8/7/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 2.0' 9,030.0 9,068.0 04:15 04:30 I Page 1151 Report Printed: 9127!2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TTme Log SM Time End Tme Our (hr) Phase Op Code M.tirdy Code Time P -TA Operation Start Depth (8KB) End Depth (ORa) 8/7/2017 8/7/2017 3.00 SLOT WELLPR MILL T Dry Tag TOC @ 9117', PUW 33.5 k. 9,068.0 9,117.0 04:30 07:30 Bring pump up 1.5 bpm at 2315 psi FS, BHP 2389, WHP 0, IA 0, OA 338. Mulitple stalls trying to get a pattern started. Mixed and pumped 50 bbl pill w/ 2.5% Safe Lube. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Safe lube at bit, 9116.96, 1.8 bpm, 9,117.0 9,117.0 07:30 08:30 2926 psi CP, (2650 psi FS, 300 psi motor work), First time able to stay on it w/out stalling, made 1 foot on Autodriller w/ 0.21K WOB, to 9118', increased WOB after 1 It and stalled. PU 33K 8/7/2017 8/7/2017 2.80 SLOT WELLPR MILL T Unable to gel mill started. Confer with 9,117.0 9,119.0 08:30 11:18 Town, tried recommended break-in procedure at low pump rate, 1.2 bpm. Tried holding in motor stall longer (per town), Spud in multiple times at 15 FPM, pumps onloff. 8/7/2017 8/7/2017 3.50 SLOT WELLPR MILL T Send Pill w/ 0.5 ppb beads, open 9,119.0 9,122.9 11:18 14:48 EDC, circulate down closer to bit, close EDC. After multiple stalls, able to stay on it at 1.8 bpm, 2980 CP, 80 to 100 psi motor work, 0.2K WOB, send second 25 bbl bead pill 8/7/2017 8/7/2017 1.70 SLOT WELLPR MILL T Decision from town to POOH for 9,122.9 62.4 14:48 16:30 different MHA 8/7/2017 8/7/2017 1.50 SLOT WELLPR MILL T At surface, OWWFF, hold PJSM, lay 0.0 62.3 16:30 18:00 down HYC 2.98" bi-center bit and Baker motor, PU HYC 2.73" SD408 Non bi-center PDC bit and new motor 8/7/2017 8/7/2017 1.80 SLOT WELLPR MILL T RIH 62.3 9,060.0 18:00 19:48 8/7/2017 8/7/2017 0.30 SLOT WELLPR MILL T Log tie in from 9000' to 9060, continue 9,050.0 9,124.0 19:48 20:06 RIH 8/7/2017 8/7/2017 2.00 SLOT WELLPR MILL T Dry tag at 9124, PU 33K. Establish 9,124.0 9,141.0 20:06 22:06 FS parameters at 1.2 bpm, 1775 psi CP, 0 WHP, 2356 psi BHP, 164 psi dP. Stall 2X creeping in at 8 FPH. PU, establish FS parameters at 1.5 bpm, 2306 psi CP, 0 WHP, 2400 psi BHP, 221 psi dP, able to get WOB w/out stall, mill cement 8/7/2017 8/8/2017 1.90 SLOT WELLPR MILL T OBM, 1.78 bpm at 2,938 psi FS, BHP 9,141.0 9,168.0 22:06 00:00 1 12,485, WHP 0, IA 0, OA 502 8/8/2017 8/812017 2.30 SLOT WELLPR MILL T OBM, 1.79 bpm at 3,025 psi, BHP 9,168.0 9,195.0 00:00 02:18 2,491. WHP 0, IA 0, OA 508, CTSW=5.6 k, DHWOB=1.7-2.0 k, ROP 30 fph 8/8/2017 8/8/2017 0.25 SLOT WELLPR MILL T Annular and bore pressure increased, 9,195.0 8,700.0 02:18 02:33 PUH 34 k, pulled 50 k at 9,155'. continued wiper above cement. 8/8/2017 8/8/2017 3.75 SLOT WELLPR MILL T RBIH, setting down at 9,167', - 8,700.0 9,195.0 02:33 06:18 9,162',9,158', 9,144', work back to bottom (16 stalls since midnight), 1.75 bpm at 2,894 psi FS, BHP 2,572, WHP 0, IA 0, OA 527 Page 2151 Report Printed: 9127120171 Jperations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Tarre EM Tme Dm (hr) Phase Op Cuee Activity Code Time P -T -X Operation start Depth (flKa) End Depth (flxa) 8/8/2017 8/8/2017 2.20 SLOT WELLPR MILL T BOBM, 1.83 bpm at 3,200 psi, BHP 9,195.0 9,212.0 06:18 08:30 2,635, WHP 0, IA 0, OA 531, CTSW=6 it, DHWOB=1.8 k, ROP 22-30 fph. Pump 5x5 sweeps, for hole cleaning. 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T PUH, PUW 51 k, DHWOB -12 k, Pull 9,212.0 62.3 08:30 10:00 free, continue PUH, open EDC, POOH pumping 2.2 bpm at 2,806 psi, chasing sweep to surface. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 62.3 62.3 10:00 10:30 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T LD Milling BHA# 2 62.3 0.0 10:30 11:00 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T WO Weatherford tools to arrive 0.0 0.0 11:00 11:30 location. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU Reaves Underreamer, 0.0 83.7 11:30 12:00 WFT Motor, Dual Acting Jars, 2.73" Stabilizer over dead well 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T Tag up, reset counters. RIH, circulate 83.7 9,050.0 12:00 13:30 minimum rate. 8/8/2017 8/8/2017 0.35 SLOT WELLPR MILL T Log formation correction plus 12.0', 9,050.0 9,091.0 13:30 13:51 PUW 36 k 8/8/2017 8/8/2017 0.40 SLOT WELLPR MILL T PUH to underream, close EDC 9,091.0 8,000.0 13:51 14:15 8/8/2017 8/8/2017 4.00 SLOT WELLPR MILL T Bring pump up to 1.6 bpm at 3,422 8,000.0 9,141.0 14:15 18:15 psi, BHP 2,225, WHP 0. IA 0, OA 429, RIH at 20 fpm, CTSW=11 k, DHWOB=O 8/8/2017 8/8/2017 0.90 SLOT WELLPR MILL T Motor work increase, stalled, PUH, 9,141.0 9,075.0 18:15 19:09 difficutly working back down, pump 5x5 sweeps, circulate bottoms up with cement chunks over the shakers, caliper indicates tubing collar at 9140'. 8/6/2017 8/8/2017 0.20 SLOT WELLPR MILL T RBIH to continue under -reaming at 9,075.0 9,141.0 19:09 19:21 9141'. 8/8/2017 8/8/2017 2.10 SLOT WELLPR MILL T Conitinue under -reaming from 9141', 9,141.0 9,212.0 19:21 21:27 stalled at 9149', PUW = 39K, continue reaming to 9190', PUW = 36K', increased motor work observed at 9209', stall, PUW = 42K from 9209', RBIH & again observe increased motor work at 9209', slow and let mill off, again let mill off at 9110', ream to end of pilot -hole at 9212' 8/8/2017 8/8/2017 1.00 SLOT WELLPR MILL T Continue with under -reamer past end 9,212.0 9,216.0 21:27 22:27 of pilot -hole, pumping 1.8 bpm, CWT = 7K, WOB =.3K, FS = 1285 psi, slow reaming at -2'-4' fph, confer with town, decision made to POOH & PU junk mill. 8/8/2017 8/9/2017 1.55 SLOT WELLPR MILL T Open EDC, begin POOH to PU 2.80" 9,216.0 2,000.0 22:27 00:00 junk mill, pumping 2.2 bpm 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Continue POOH, tag up, space out 2,000.0 84.0 00:00 00:30 8/9/2017 8/9/2017 0.90 SLOT WELLPR MILL T PJSM, flow -check well, LD BHA#3 84.0 0.0 00:30 01:24 over dead well, under -reamer came out looking good, gauging at 2.90" Page 3151 Report Printed: 9/2712017 �. Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Time End Time our (hr) Phase Op Code Actiaty Code Time P -T -x Operation Start Depth (flK8) Elm oePm (Po(a) 8/9/2017 8/9/2017 0.60 SLOT WELLPR MILL T PJSM, PU BHA #4 (0° AKO X-Treme 0.0 80.0 01:24 02:00 motor, Baker G -Force up/down jars, 2.80" five -bladed junk -mill), slide in cart, stab on, check pack -offs, tag up 8/9/2017 8/9/2017 1.70 SLOT WELLPR MILL T RIH with BHA #4 80.0 9,040.0 02:00 03:42 8/9/2017 8/9/2017 0.10 SLOT WELLPR MILL T Tie into formation for a +11.5' 9,040.0 9,078.0 03:42 03:48 correction, close EDC 8/9/2017 8/9/2017 0.70 SLOT WELLPR MILL T Continue RIH, set down twice at 9,078.0 9,216.0 03:48 04:30 9144' (min rate & pumps off), PUW = 40K, bring up pumps to 1.8 bpm, FS = 358 psi, stall at 9142', PUW = 40K, attempt milling at -12 fph and get by, drop rate & continue RIH to 9216', PUH, bring up rate 8/9/2017 8/9/2017 2.00 SLOT WELLPR MILL T Milling at 9216, rate in = 1.8 bpm, FS 9,216.0 9,270.0 04:30 06:30 = 345 psi, CWT = 1 OK, BHP = 2677 psi, WOB = .SK, Stall at 9270'. Pump 5 x 5 sweeps. 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole to 9155, PUW = 36K, 9,270.0 9,155.0 06:30 07:00 Caught sample. 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper back in hole. RIH = 8K 9,155.0 9,270.0 07:00 07:30 8/9/2017 819/2017 2.00 SLOT WELLPR MILL T BOBM, Rate In/Out = 1.8 bpm, FS = 9,270.0 9,336.0 07:30 09:30 355 psi, CWT = 8K, BHP = 2665 psi, WOB = 0.5-2k, ROP=30-70 fph 819/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole, PUW 40 k 9,336.0 9,160.0 09:30 10:00 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 9,160.0 9,336.0 10:00 10:30 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T BOBM, 1.82 bpm at 3,600 psi, BHP 9,336.0 9,350.0 10:30 11:00 2,749, WHP 0, IA 0, OA 577, 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper up hole PUW 38 k 9,350.0 9,159.0 11:00 11:15 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 5 k 9,159.0 9,350.0 11:15 11:30 8/9/2017 8/9/2017 3.25 SLOT WELLPR MILL T BOBM, 1.79 bpm at 3,830 psi, BHP 9,350.0 9,357.0 11:30 14:45 2,503, WHIP 0, IA 0, OA 595, trouble keeping steady DHWOB, pump 5x5 sweep 8/9/2017 8/9/2017 2.25 SLOT WELLPR MILL T POOH, to check inspect BHA, filling 9,357.0 80.0 14:45 17:00 out trip sheet every 1000' 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T PJSM, flow check, LD BHA #4 over a 0.0 75.0 17:00 18:24 dead well, PU BHA #5 (G -Force up/down jar, agitator, X-Treme motor, 5 blade junk mill, 2.81'), surface test agitator, good 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T RIH with BHA #5 75.0 9,040.0 18:24 19:48 8/9/2017 8/9/2017 0.30 SLOT WELLPR MILL T Log formation for +//'correction 9,040.0 9,080.0 19:48 20:06 8/9/2017 8/9/2017 0.20 SLOT WELLPR MILL T Continue RIH 9,080.0 9,357.0 20:06 20:18 8/9/2017 8/9/2017 2.10 SLOT WELLPR MILL T OBM, pumping 1.8 bpm, annular = 9,357.0 9,410.0 20:18 22:24 2770, CWT = 9K, WOB = 1.8K„ pump 5x5 sweep, average ROP over interval = 25 fph Page 4151 Report Printed: 9127/2017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Steri Time End Time our Ile) Phase op code ArAWty Code Time P -T -X Operation dtKB) End Depih(flKB) 8/912017 8/9/2017 0.40 SLOT WELLPR MILL T Wiper -trip up to 9102', PUW = 35K, 9,410.0 9,410.0 22:24 22:48 RIW = 7.5K, no issues RIH past 9141' 8/9/2017 8/10/2017 1.20 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, CWT = 9,410.0 9,463.0 22:48 00:00 7.75K, WOB= 1.8K, BHP = 2780 psi, WOB dropped to OK from 9416'- . 9419', encounter greenlincompetent cement beginning at 9434' (continued to midnight depth of 9463'), no WOB or motor work observed 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T Continue in green/incompetant 9,463.0 9,600.0 00:00 00:30 cement from 9463'to 9600', observe significant cement over shakers 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper up -hole to TOC, PUW = 36K 9,600.0 9,090.0 00:30 00:42 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper in-hole, RIW = 7K 9,090.0 9,600.0 00:42 00:54 8/10/2017 8/10/2017 1.00 SLOT WELLPR MILL T Continue in green cement from 9600', 9,600.0 9,814.0 00:54 01:54 continue to observe significant cement with soft tan material intermixed over shakers, Sulfuric acid (H2SO4) test on samples indicates cement, though non reactive with tan material, performing short WT's to evaluate hole loading, PUW= 36K -44K 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T 725' wiper trip up to 9090', PUW = 9,814.0 9,814.0 01:54 02:30 37K, RIW = 8.3K, pump 5x5 sweeps 8/10/2017 8/10/2017 1.50 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, BHP = 9,814.0 9,866.0 02:30 04:00 2878 psi, FS = 869 psi, stall at 9817', PUW = 39K, CWT = 1 OK, WOB = .5K, encounter competent cement again at 9815', pump 5x5 sweep 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T WT up -hole, PUW = 32K 9,866.0 7,836.0 04:00 04:30 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T WT in-hole, lie into formation for= -5' 7,836.0 - 9,866.0 04:30 05:15 correction, RIW = 8K 8/10/2017 8/10/2017 3.00 SLOT WELLPR MILL T BOBM, 1.79 bpm at 4,269 psi, BHP 9,866.0 9,950.0 05:15 08:15 2,880, WHP 0, IA 0, OA 608 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T Wiper up hole, PUW 38 k 9,950.0 9,700.0 08:15 08:30 8/10/2017 6/10/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 6.4 k 9,700.0 9,950.0 08:30 08:45 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T BOBM, 1.81 bpm at 4,245 psi, BHP 9,950.0 9,971.0 08:45 09:15 1 1 1 2,940, WHP 0, IA 0, OA 606 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T Stall motor, unable to move pipe, Pulll 9,971.0 9,971.0 09:15 09:30 65 k, pipe moving, short wiper up hole to 9,806'. 8/10/2017 8/1012017 2.50 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,380 psi, BHP 9,971.0 10,015.0 09:30 12:00 3,050, WHP 0, IA 0, OA 608 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, PUW 34 k, unable 10,015.0 10,015.0 12:00 12:45 to pump, seems motor is locked up, open EDC, pump 5x5 sweep, 8110/2017 8/10/2017 1.50 SLOT WELLPR MILL T POOH, pump 2.3 bpm w/open EDC 10,015.0 74.8 12:45 14:15 4,230 psi, filling trip sheet every 1000' 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T At surface, check well for flow, PJSM 74.8 74.8 14:15 14:30 Page 6151 Report Printed: 9 /2 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(Ia) Phase Op Code Ac fty Code Time P -T -X Operadon (ftKB) End Depth WB) 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T LD milling BHA# 5, inspect tools. 74.8 0.0 14:30 15:00 found BHI motor to be locked up, agitator checked out good. 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T PU/MU Milling BHA# 6, w/new X- 0.0 74.6 15:00 15:45 - Trams motor 8/10/2017 8/10/2017 1.70 SLOT WELLPR MILL T RIH, pumping 0.30 bpm at 1138 psi, 74.6 9,050.0 15:45 17:27 filling trip sheet every 1000'. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Log formation correction of+10 9,050.0 1 9,082.0 17:27 17:39 8/10/2017 8/10/2017 0.55 SLOT WELLPR MILL T Continue RIH, RIW = 9K 9,082.0 10,015.0 17:39 18:12 8/10/2017 8/10/2017 1.70 SLOT WELLPR MILL T OBM at 10,015', pumping 1.8 bpm, 10,015.0 10,075.0 18:12 19:54 CWT = 1 OK, WOB =1.5K, annular = 3004 psi, pumping sweeps to coincide with WT. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper trip (200'), PUW = 35K, RIW = 10,075.0 10,075.0 19:54 20:06 6K 8/10/2017 8/10/2017 1.80 SLOT WELLPR MILL T OBM at 10,070', pumping 1.8 bpm, FS 10,075.0 10,126.0 20:06 21:54 =948 psi, CWT =4.5K, WOB =1.1 K, annular= 3078 psi, 5x5 sweeps coming around. 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T Stall at 10,126', shut down pumps,. 10,126.0 10,117.0 21:54 22:30 PU, start pulling heavy, RBIH, became momentarily detained, bring up pumps, dp jumps up, shut down pumps, jar down twice, jar up 3 times, no success, attempt to bring up pumps, dp increased rapidly (stall condition at 1700 psi diff), shut down pumps, rale out begins to trickle, bring pumps back up, rate out returns, BHA is free, (note: saw DHWOB up to - 15.8K & 70K CWT) 6/10/2017 8/10/2017 1.00 SLOT WELLPR MILL T WT (up to 9295'), circulate bottoms 10,117.0 10,126.0 22:30 23:30 up, RIW = 6.51K - 8/10/2017 8/11/2017 0.50 SLOT WELLPR MILL T OBM at 10,126', pumping 1.8 bpm, FS 10,126.0 10,138.0 23:30 00:00 = 945 psi, dp = 1042 psi, CWT = 4.6K, WOB = 1.51K, annular = 3110 psi 8/11/2017 8/11/2017 1.00 SLOT WELLPR MILL T Continue milling cement at 10,138' 10,138.0 10,165.0 00:00 01:00 pumping 1.8 bpm, CWT= 1.5K, WOB = 2K, annular = 3160 psi, WHIP = 0 psi, FS = 945 psi, dp = 1061 psi, IA = 0 psi, OA = 631 psi, pump sweeps 8/11/2017 8/11/2017 0.40 SLOT WELLPR MILL T Sweeps come around, WT (500'), 10,165.0 10,165.0 01:00 01:24 PUW=38K, RIW=7K 8111/2017 8/11/2017 1.60 SLOT WELLPR MILL T OBM at 10,165, pumping 1.8 bpm, FS 10,165.0 10,215.0 01:24 03:00 = 945 ps, CWT = 4.41K, WOB = 1.31K, annular = 3176 psi, pump sweeps timed for WT 8/11/2017 8/11/2017 0.30 SLOT WELLPR MILL T WT (200'), PUW = 38K, RIW = 4K 10,215.0 10,215.0 03:00 03:18 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T OBM at 10,215' pumping 1.8 bpm, FS 10,215.0 10,270.0 03:18 05:18 =940 psi, CWT =2.5K, WOB =1.9K, annular = 3215 psi, pump sweeps timed for WT 8/1112017 8/11/2017 0.45 SLOT WELLPR MILL T WT up 200', PUW=40 k, 10,270.0 10,270.0 05:18 05:45 1 1 Page 6151 Report Printed: 9/2712017 AN: , i Operations Summary (with Timelog L)epths) 3M-27 qW Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log StaM1Time End Time Dur (h) Phase op Code Activity Cnce Time P -T -x Operation Sad Depth (*Q1) End Depth(ttKB) 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm FS = 4126 10,270.0 10,319.0 05:45 07:45 psi, CTSW=O k, DHWOB=2.2 k, BHP 2,543, WHP 0, IA 0, OA 659 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Swap milling fluid, wiper up hole, 10,319.0 9,050.0 07:45 08:15 8/1112017 8/11/2017 0.35 SLOT WELLPR MILL T Wiper trip back in hole, RIW 11.5 k 9,050.0 10,220.0 08:15 08:36 8/11/2017 8/11/2017 0.25 SLOT WELLPR MILL T Log formation for depth control 10,220.0 10,259.5 08:36 08:51 correction plus 6.5' 8/11/2017 8/11/2017 0.35 SLOT WELLPR MILL T Continue IH 10,259.5 10,319.0 08:51 09:12 8/11/2017 8/11/2017 1.95 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,535' psi FS, BHP 10,319.0 10,374.0 09:12 11:09 2,705,WHP 0, IA 0. OA 644 6/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper up hole 500', PUW 36 k 10,374.0 10,374.0 11:09 11:39 8/11/2017 8/11/2017 1.40 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,560 psi, BHP . 10,374.0 10,404.0 11:39 13:03 2,795, WHIP 0, IA 0, OA 634 8/11/2017 8/11/2017 0.60 SLOT WELLPR MILL T Encountered green cement, RIH wino 10,404.0 10,425.0 13:03 13:39 diff, pumping 1.77 bpm at 3,606 psi, set down 10,424' stall motor. 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000'9,450', PUW 38 10,425.0 10,425.0 13:39 14:09 k 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T RIH trying to find bottom, 1.77 bpm at 10,425.0 10,433.0 14:09 14:39 3,581 psi, BHP 2,847, WHIP 0, IA 0, OA 628, stall motor, PUW 43 k.'•' 29' of green cement 8.75 ppg max 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T Bring pump back on line, RBIH, 1.8 10,433.0 10,475.0 14:39 16:39 bpm at 3,747 psi, BHP 2,871, IA 0, OA 623 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper trip up hole 1000'(9,475), PUW 10,475.0 10,475.0 16:39 17:09 42 k 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 10,475', CWT= 10,475.0 10,525.0 17:09 19:09 6K, WOB = 2K, annular = 2965 psi, stall at 10,523', PUW = 45K, continue milling ahead to allow sweep to exit bit. 8/11/2017 8/11/2017 0.85 SLOT WELLPR MILL T WT (1000'), PUW =40K, RIW = 7K 10,525.0 10,525.0 19:09 20:00 8/11/2017 8/11/2017 2.30 SLOT WELLPR MILL T BOBM, 1.8 bpm, CWT = 7K, WOB = 10,525.0 10,575.0 20:00 22:18 1.71K, annular= 2946 psi, pump sweeps 8/11/2017 8/11/2017 1.30 SLOT WELLPR MILL T WT, (1000'), PUW = 43K, tie-in for- 10,575.0 10,565.0 22:18 23:36 19' correction, RIW = 7K, puts new corrected depth at 10,555', tag bottom 10' deeper at 10,565', plan to check counter 8/11/2017 8/12/2017 0.40 SLOT WELLPR MILL T OBM, CWT = 3.7K, WOB = 1.9K, FS = 10,565.0 10,572.0 23:36 00:00 814 psi, annular = 3059 psi 8/12/2017 8/12/2017 3.30 SLOT WELLPR MILL T Continue milling from 10,572', 10,572.0 10,625.0 00:00 03:18 pumping 1.8 bpm, CWT = 4.71K, FS = 814 psi, WOB = 2K, annular = 3044 psi, pump sweeps, stall at 10,585', PUW = 45K, BHA wiper up to 10,485', stall at 10,612', PUW = 43K, prepping to build new milling system on dg, current system at —70K LSRV Page 7151 ReportPrinted: 9/27/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tithe Log Stavere End Time ow(hr) Pham Op code Activity Code Tame P -T -X operation (Po(B End DeP 8/12/2017 8/12/2017 1.00 SLOT WELLPR MILL T WT (1000, PUW = 43K, RIW = 9K 10,625.0 10,625.0 03:18 04:18 Note: Candg data is faulty/bogus, troubleshoot issue 8/12/2017 8/12/2017 2.90 SLOT WELLPR MILL T OBM, annular= 3144, CWT= 7K, 10,625.0 10,675.0 04:18 07:12 WOB = 1.9K, stalled at 10,639', PUW = 60K 8/12/2017 8/1212017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 42 k, Wiper 10,675.0 10,675.0 07:12 07:42 back in hole, RIW 7 k 8/12/2017 8/12/2017 2.60 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,700 psi, BHP 10,675.0 10,725.0 07:42 10:18 3,995, WHP 0, IA 0, OA 629, 8/12/2017 8/1212017 0.50 SLOT WELLPR MILL T wiper up hole, 9,800', PUW 41 k, 10,725.0 10,220.0 10:18 10:48 RBIH, RIW 7 k 8/12/2017 8/12/2017 0.50 SLOT WELLPR MILL T Log formation correction of minus 10,220.0 10,268.0 10:48 11:18 61.5', inspect and clean counter 8/1212017 8/122017 0.45 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 10,268.0 10,725.0 11:18 11:45 8/12/2017 8/12/2017 2.25 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,499 psi, BHP 10,725.0 10,784.0 11:45 14:00 2,772, WHP 0, IA 0, OA 596, CTSW=10.2,k, DHWOB=2.2, ROP 21 Ph 8/12/2017 8/122017 0.75 SLOT WELLPR MILL T Wiper up hole to 9,783', 1000' PUW 10,784.0 10,784.0 14:00 14:45 43 k 8/12/2017 8/12/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,500psi, BHP 10,784.0 10,840.0 14:45 16:45 2,921, WHP 0, IA 0, OA 588, CTSW=7 -10k, DHWOB=2.5k, ROP 30 fph 8/12/2017 8/122017 1.20 SLOT WELLPR MILL T Wiper up hole 1000', PUW = 40K, 10,840.0 10,840.0 16:45 17:57 RIW = 8.5K 8/12/2017 8/122017 1.90 SLOT WELLPR MILL T BOBM pumping 1.78 bpm, CWT = 10,840.0 10,890.0 17:57 19:51 3.2K, WOB = 2.4K, annular = 2871 psi, IA = 0 psi, OA = 586 psi, circ pressure = 3645 psi, stall at 10,858', PUW = 52K, pump 5x5 sweeps 8/12/2017 8/122017 1.00 SLOT WELLPR MILL T Wiper up -hole 1000', PUW = 42.5K, 10,890.0 10,890.0 19:51 20:51 tie-in for -3' comection, RIW = 8K 8/12/2017 8112/2017 2.30 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 800 10,890.0 10,946.0 20:51 23:09 psi, CWT = 6K, WOB = 2K, annular = 2841 psi, circ pressure = 3662 psi 8/122017 8/122017 0.70 SLOT WELLPR MILL T WT up -hole 1000', PUW = 42K, RIW = 10,946.0 10,946.0 23:09 23:51 8K 8/12/2017 8/132017 0.15 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 778 10,946.0 10,949.0 23:51 00:00 psi, CWT = 3.5K, WOB = 2.3K, annular = 2903 psi 8/13/2017 8/13/2017 1.70 SLOT WELLPR MILL T Continue milling at 10949', pumping 10,949.0 10,990.0 00:00 01:42 1.8 bpm, CWT =3K, WOB =2K, annular= 2906 psi, pump sweeps 8113/2017 8/13/2017 0.70 SLOT WELLPR MILL T Wiper 1000' up -hole, PUW =43K, 10,990.0 10,990.0 01:42 02:24 RIW = 8K 8/1312017 8/13/2017 2.80 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 809 10,990.0 11,040.0 02:24 05:12 psi, CWT = 7K, WOB = 2.4K, annular = 2880 psi, WHP = 0 psi, IA = 0 pis, OA = 595 psi, circ pressure = 3775 psi, MW In = 8.47 ppg, MW Out = 8.47 ppg, LSRV = 19.9K, stalled at 11,013', pump sweeps, stall at 11,033', PUW = 52K 8/13/2011 8/13/2017 1.00 SLOT WELLPR MILL T WT up -hole 1000', PUW =47 k 11,040.0 11,040.0 05:12 06:12 Page 8/51 Report Printed: 912 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth SWTime Entl Tmre Dw(hr) Phase Op Cotle AcHvity Code TM PJA oparatlon (flKa) End Depthinika) 8/13/2017 8/13/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,500 psi, BHP 11,040.0 11,090.0 06:12 08:12 2,976, WHP 0, IAO, OA 611, CTSW=7 k, DHWOB=2.3 k, ROP 28 fph 8/13/2017 8/13/2017 0.80 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 43 k, with 11,090.0 10,090.0 08:12 09:00 5x5 sweep 8/13/2017 8/13/2017 3.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,759 psi, BHP 11,090.0 11,155.0 09:00 12:00 3,054. WHP 0, IA 0, OA 629, CTSW=6 k, DHWOB=2.6 k, ROP 29 fph 8/13/2017 8/13/2017 2.50 SLOT WELLPR MILL T Pump 5x5 sweep, POOH, (open EDC 11,155.0 78.8 12:00 14:30 @ 9,093') 8/13/2017 8/13/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 78.8 78.8 14:30 15:00 8/13/2017 8/13/2017 0.75 SLOT WELLPR MILL T LD BHA, remove BHI check valves 78.8 0.0 15:00 15:45 8/13/2017 8/13/2017 2.25 SLOT WELLPR MILL T PU/MU, nozzle, stab INJH, jet stack 0.0 0.0 15:45 18:00 and surface lines, grease tree & stack 8/13/2017 8/13/2017 1.00 SLOT WHDBOP ROPE P Perform BOPE Test (begin test at 0.0 0.0 18:00 19:00 18:00 hrs), witness waived by AOGCC (Brian Bixby), break off nozzle, slide back cart, put on night-cap. 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Test#1, (faillpass on low), was 0.0 0.0 19:00 20:00 leaking past Bleeder 4 8/13/2017 8/13/2017 1.40 SLOT WHDBOP BOPE P Continue BOPE test, a bit of difficulty 0.0 0.0 20:00 21:24 getting low on Test #4, pressure up to 1500 psi, bled down, pass 8/13/2017 8/13/2017 0.90 SLOT WHDBOP BOPE T Test #5, grease Bravo 2, fail/pass 0.0 0.0 21:24 22:18 8/13/2017 8/13/2017 0.70 SLOT WHDBOP BOPE P Continue BOPE test 0.0 0.0 22:18 23:00 8/13/2017 8/13/2017 0.80 SLOT WHDBOP BOPE T Test#9, grease & cycle Romeo 3, 0.0 0.0 23:00 23:48 fail/pass 8/13/2017 8/14/2017 0.20 SLOT WHDBOP BOPE P Continue BOPE test D.0 0.0 23:48 00:00 8/14/2017 8/14/2017 2.00 SLOT WHDBOP ROPE P Continue BOPE test(8hr test) 0.0 0.0 00:00 02:00 8/14/2017 8/14/2017 2.00 SLOT WELLPR MILL T Replace houred out UQC, replace 0.0 0.0 02:00 04:00 checks, open & clean out MM & choke lines, transducer lines & TT lines of potential cement fall out, await BOT arrival 8/14/2017 8/14/2017 1.50 SLOT WELLPR MILL T PJSM, PU BHA#7 (2.81"junk mill, 0.0 74.0 04:00 05:30 BOT motor, agitator, up/down jars, 10' pup), slide in cart, stab on, RIH to 738' test agitator (good -test) 8/14/2017 8/14/2017 2.25 SLOT WELLPR MILL T RIH 74.0 10,305.0 05:30 07:45 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T Log formation, loo deep, PBUH, re- 10,305.0 10,170.0 07:45 08:15 start logging 10,170' 8/14/2017 8/14/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 36' 10,170.0 10,259.0 08:15 08:30 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T RIH 10,259.0 11,171.0 08:30 09:00 8/14/2017 8/14/2017 1.75 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,400 psi, BHP 11,171.0 11,210.0 09:00 10:45 2,734, WHP 0, IA 0, OA 497 8/1412017 8/1412017 0.75 SLOT WELLPR MILL T Wiper up hole 1000% PUW 43 k, 11,210.0 11,210.0 10:45 11:30 1 1 RBIH, RIW 10 k, with 5x5 sweep Page 9/51 Report Printed: 9/2 712 01 7 . Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tune Log Sled Depth Start Time End Tera Der(ho PAsae op Code Activ4 Code Time P -T -X opembem (111(81 End Depth(mce) 8/1412017 8/14/2017 1.30 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,180 psi, BHP 11,210.0 11,260.0 11:30 12:48 3,860, WHIP 0, IA 0, OA 494, CTSW=11 k, DHWOB=2.4 k, ROP=45 fph 8/14/2017 8114/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000', PUW 38 k, wiper 11,260.0 11,260.0 12:48 13:33 back in hole, RIW 9 k with 5x5 sweep 8/14/2017 8/14/2017 1.65 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,040 psi, BHP 11,260.0 11,314.0 13:33 15:12 2,825. WHIP 0, IA 0, OA 510, CTSW=g k, DHWOB=2.9 k, ROP=37 fph 8/14/2017 8/14/2017 0.70 SLOT WELLPR MILL T WT up -hole 1000'@ 100 fpm, PUW = 11,314.0 11,314.0 15:12 15:54 41K, RIW=11K 8/14/2017 8/14/2017 1.60 SLOT WELLPR MILL T OBM, 1.7 bpm, 1.7 bpm, CWT= 7.5K, 11,314.0 11,365.0 15:54 17:30 WOB = 1.71K 8/14/2017 8114/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW =40K, RIW = 11,365.0 11,365.0 17:30 17:54 11K 8/14/2017 8/14/2017 2.70 SLOT WELLPR MILL T OBM, CWT =9K, WOB =2.7K, 11,365.0 11,415.0 17:54 2036 annular = 2882 psi, circ pressure = 3181 psi 8/14/2017 8/14/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', 100 fpm, PUW = 11,415.0 11,415.0 20:36 21:00 39K, RIW = 10 K 8/14/2017 8/15/2017 3.00 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT= 6KK, WOB = 11,415.0 11,462.0 21:00 00:00 2.5 K, annular = 2919 psi, FS = 854 psi, pump sweeps, slower ROP at. - 17 fph, PUW = 45K from 11,483' 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Continue milling from 11,462' 11,462.0 11,465.0 00:00 00:12 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T WT up -hole 1000' at 100 fpm, PUW = 11,465.0 11,465.0 00:12 00:42 45K, RIW = 10K, pause at 11,452'to inspectltroublshoot depth counter 8/15/2017 8/15/2017 3.50 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT= 6K, WOB = 11,465.0 11,516.0 00:42 04:12 1.9K, annular = 2923 psi, circ pressure = 3335 psi, PU from 11,472 to adjust depth counter, PUW = 44K, stall at 11,508', PUW = 48K 8/15/2017 8/1512017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW = 44K, RIW = 11,516.0 11,516.0 04:12 04:36 8K 8/15/2017 8/15/2017 1.15 SLOT WELLPR MILL T A couple stalls getting to bottom, 11,516-.0 11,530.0 04:36 05:45 OBM, 1.7 bpm, CWT = 4.8K, WOB = 1.61K, annular= 3012 psi 8/15/2017 8/15/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, differential 1,000 11,530.0 11,435.0 05:45 06:30 psi, higher then free spin. adjust pump rate, looks like we have chucked motor or have a failed agitator, inspect pipe gouge, take pictures, file down gouge, inspect counter heads CTES and INJH. 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T POOH, to inspect BHA 11,435.0 74.2 06:30 08:30 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 74.2 0.0 08:30 09:00 8/15/2017 8/15/2017 1.50 SLOT WELLPR MILL T LD BHA V. PU BHA #8, (2.81"junk 74.2 580.0 09:00 10:30 mill, BOT motor, agitator, up/down jars, 10' pup) slide in cart, stab on, RIH to 567'test agitator (good -test) 8/15/2017 8/15/2017 1.80 SLOT WELLPR MILL T RIH 580.0 10,210.0 10:30 12:18 8/1512017 8/15/2017 0.20 SLOT WELLPR MILL T Tie-In,+14'Conection 10,210.0 10,275.0 12:18 12:30 Page 10151 Report Printed: 9/27/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slart Depth Start Time End Tene Dur (hr) Phase Op Code Activity Cafe Time P -T -X Opembon VKe) Erb Depth(fiKB) 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T RIH 10,275.0 11,542.0 12:30 13:00 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T Tag TO. BOBM, 1.7 bpm, CWT = 8K, 11,542.0 11,590.0 13:00 15:00 WOB = 2.5K, annular = 3112 psi, circ pressure = 4178 psi, Pump 1% DrillZone pill at 11,555': No Benefit, Mud -swap, New mud at bit: 11585' 8/1512017 8/15/2017 0.50 SLOT WELLPR MILL T WT up hole 1000', PUW =45k, RIW = 11,590.0 11,490.0 15:00 15:30 10k 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T BOBM, 1.7 bpm, CWT= 12k, WOB = 11,590.0 11,599.0 15:30 16:00 2.6k, annualar = 2880 psi, circ pressure = 3464 psi 8/15/2017 8/15/2017 3.00 SLOT WELLPR MILL T Mechanical coupling on injector drive 11,599.0 11,599.0 16:00 19:00 chain separated. Wait on parts and repair. Circulate botttoms up. Shut down pumps. Open EDC. Circulate 2nd bottoms up. NAD NPT 3 Hours 8115/2017 8/15/2017 0.10 SLOT WELLPR MILL T Injector motor coupler replaced, Close 11,599.0 11,599.0 19:00 19:06 EDC. estqabish circulation at .3 BPM up to 1 BPM, PUH, PUW=45K 8/15/2017 8/1512017 3.40 SLOT WELLPR MILL T PUH clean to 11,480, RBIH to mill 11,599.0 11,650.0 19:06 22:30 cement, 1.7 BPM @ 3285 PSI FS, BHP=2928 811512017 8/15/2017 0.40 SLOT WELLPR MILL T 11650, Wiper up to window with tie in 11,650.0 10,210.0 22:30 22:54 before entering GLM @ 11,666 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Log GR for +2.5' correction 10,210.0 10,259.0 22:54 23:06 8/15/2017 8/15/2017 0.30 SLOT WELLPR MILL T Continue back to bottom to mill 10,259.0 11,651.0 23:06 23:24 8/15/2017 8/16/2017 0.60 SLOT WELLPR MILL T 11651', Mill, 1.7 BPM @ 3331 PSI FS 11,651.0 11,659.0 23:24 00:00 8/16/2017 8/16/2017 2.40 SLOT WELLPR MILL T Continue milling cement, 1.7 BPM @ 11,659.0 11,700.0 00:00 02:24 3331 PSI FS, 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pull 1 000'wiper trip, PUW=48K 11,700.0 11,700.0 02:24 02:54 8/16/2017 8/16/2017 2.60 SLOT WELLPR MILL T 11,700 Mill Cement, 1.7 BPM @ 3454 11,700.0 11,750.0 02:54 05:30 PSI FS 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=45k 11,750.0 11,750.0 05:30 05:54 8/16/2017 8/16/2017 2.20 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT = 10K, WOB = 11,750.0 11,800.0 05:54 08:06 2.7K, annular = 3010 psi, circ pressure = 3650 psi 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,800.0 11,800.0 06:06 0836 trip, PUW=43k 8/16/2017 8/16/2017 2.50 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT = 8k, WOB = 11,800.0 11,850.0 08:36 11:06 2.7k, annular = 3115 psi, circ pressure = 3815 psi, Pump 5 bbl low vis sweep at 11,825'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1 000'wiper 11,850.0 11,850.0 11:06 11:36 trip, PUW=44k 8/16/2017 8/1612017 3.00 SLOT WELLPR MILL T BOBM. Increase rate to 1.8 bpm, 11,850.0 11,904.0 11:36 14:36 CWT = 8k, WOB = 2.8k, annular= 3255 psi, circ pressure = 4820 psi, Continue pumping low vis sweep every 25'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Fluid swap to 11,904.0 11,904.0 14:36 15:06 new system. Pull 1000' wiper trip, PUW = 43k Page 11/51 ReportPrinted: 9/2 712 01 7 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log $1&t Time End Tme Dur(hr)Phase Op Cade Atl ity Caste Time PJA operation Start Depth (W) End Depth(flKB) 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T BOBM. 1.8 bpm, CWT = 12k, WOB= 11,904.0 11,950.0 15:06 1724 2.8k, annular = 2975 psi, circ pressure = 3575 psi 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,950.0 11,950.0 17:24 17:48 trip, PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 11950 Mill, 1.8 BPM @ 3504 PSI FS 11,950.0 12,000.0 17:48 20:06 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T 12000', pump sweeps, pull 1000' 12,000.0 12,000.0 20:06 20:30 wiper. PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 12,000', Mill, 1.8 BPM @ 3596 PSI. 12,000.0 12,050.0 20:30 22:48 FS, BHP=3081 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T 12050', Pump sweeps, pull 1000' 12,050.0 12,050.0 22:48 23:18 wiper, PYW=45K 8/16/2017 8/17/2017 0.70 SLOT WELLPR MILL T 12050', Mill, 1.8 BPM @ 3627 PSI FS, 12,050.0 12,066.0 23:18 00:00 BHP=3081 8/1712017 8/17/2017 1.50 SLOT WELLPR MILL T 12066', Milling cement, 1.8 BPM @ 12,066.0 12,100.0 00:00 01:30 3627 PSI FS, BHP=3100 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T 12,100', Pump sweeps, pull 1000' 12,100.0 12,100.0 01:30 02:00 1 1 1 wiper, PUW=48K 8/17/2017 8/17/2017 1.50 SLOT WELLPR MILL T 12105', milling, 5' difference in bottom, 12,100.0 12,134.0 02:00 03:30 1 1.8 BPM @ 3676 PSI FS, BHP=3112 8117/2017 8/1712017 2.50 SLOT WELLPR MILL T Motor stall, Pull off bottom motor 12,134.0 74.2 03:30 06:00 would not relieve pressure, Diff pressire 170OPSI @ .9 BPM. Can not get it to clear, Trip out for BHA. 8/17/2017 8/17/2017 1.10 SLOT WELLPR MILL T Verify well is dead. Unstab injector. 74.2 0.0 06:00 07:06 LD Mill, Motor, and Agitator. Test motor and agitator at surface with rig water and dg air. Inconclusive. Make up Agitator and nozzle. 8/1712017 8/17/2017 0.50 SLOT WELLPR MILL T Change out BOP manifold pressure 0.0 0.0 07:06 07:36 1regulator. 81172017 8/17/2017 0.50 SLOT WELLPR MILL T Stab injector. Function test Agitator 0.0 0.0 07:36 08:06 from BHA #8 at surface on coil. 1.5 bpm, 1415 differential pressure. No agitation felt at surface. 8/172017 8/17/2017 0.50 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 0.0 08:06 08:36 #8. PU Agitator from BHA #7 and nozzle. 8/172017 8/17/2017 0.40 SLOT WELLPR MILL T Stab injector. Function test Agitator 0.0 0.0 08:36 09:00 from BHA #7 at surface on coil. 1.5 bpm, 667psi. 1.8 bpm 825 psi. No agitation felt at surface. 8/172017 8/17/2017 0.70 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 73.6 09:00 09:42 #7. PU BHA #9. D331 Ridge Set, BOT Motor, new Agitator. Stab - injector. Replace stripper pack-off. 8/172017 8/17/2017 0.30 SLOT WELLPR MILL T RIH to 480' and shallow test Agitator. 73.6 480.0 09:42 10:00 1.8 bpm. Vissible vibration on counter wheel. 8/17/2017 8/17/2017 2.20 SLOT WELLPR MILL T RIH. Tie-In+17'correctlon. RIH to 480.0 12,132.0 10:00 12:12 bottom. 8/172017 8/17/2017 1.30 SLOT WELLPR MILL T BOBM. 1.7 bpm, Free Spin = 870 psi, 12,132.0 12,185.0 12:12 13:30 CWT = 11 K, WOB = 2K, annular = 3190 psi, circ pressure = 4200 psi. 8/17/2017 8/172017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=47k. 12,185.0 12,185.0 13:30 14:00 1 Page 12151 Report Printed: 912712017 . Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sun TWne End TMa our (hr) Phase Op Catle Activity Cafe Time P-T-X Operation start Depth(flKB) End Depth(N(9) 8/17/2017 8/17/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,185.0 12,232.0 14:00 15:00 WOB=2.5k, annular-3180 psi, circ=4200 psi. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=50k. 12,232.0 12,232.0 15:00 15:30 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=7k, 12,232.0 12,282.0 15:30 17:06 WOB=2.5k, annular-3300 psi, circ=4360 psi. 8/17/2017 8/17/2017 0.60 SLOT WELLPR MILL T Pull 1000' wipertrip, PUW=53k. 12,282.0 12,282.0 17:06 17:42 8/17/2017 8/17/2017 1.40 SLOT WELLPR MILL T 12262', Mill, 1.7 BPM @ 4090 PSI FS, 12,282.0 12,335.0 17:42 19:06 BHP=3320 8/17/2017 8117/2017 0.30 SLOT WELLPR MILL T 12335, 1000'wiper, PUW=48K 12,335.0 12,335.0 19:06 19:24 8/17/2017 8/17/2017 2.50 SLOT WELLPR MILL T 12335', Mill, 1.7 BPM @ 4090 PSI FS, 12,335.0 12,387.0 19:24 21:54 BHP=3320, New milling fluid around @ 12362 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T 12387, 1000'wiper, PUW=52 K 12,387.0 12,387.0 21:54 22:18 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T 12387', Mill, 1.7 BPM @ 3660 PSI FS, 12,387.0 12,435.0 22:18 23:54 BHP=3395 Cement void @ 12410 to 12414 with no WOB of differential pressure 8/17/2017 8/18/2017 0.10 SLOT WELLPR MILL T 12435, 1000'wiper, PUW=53K 12,435.0 12,040.0 23:54 00:00 8/18/2017 8/18/2017 0.30 SLOT WELLPR MILL T Continue 1000'wiperfrom 12434 12,040.0 12,434.0 00:00 00:18 8/18/2017 8/18/2017 1.60 SLOT WELLPR MILL T 12434', Milling, 1.7BPM @ 3352 PSI 12,434.0 12,478.0 00:18 01:54 FS, BHP=3248, Couple of stalls in 12472' area. Posible seal locator - 8/18/2017 8/18/2017 1.60 SLOT WELLPR MILL T During walkaroud injector motor 12,478.0 12,464.0 01:54 03:30 coupler coming loose. PUH and circulate bottoms up. Open EDC and continue to circulate. Begin NAD NPT Start couple repair, 1.5 Hrs NAD NPT 8/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T Repairs complete, shut EDC. 12,464.0 10,200.0 03:30 04:06 1Continue wiper trip to tie in 8/18/2017 8/18/2017 0.20 SLOT WELLPR MILL T Log tie in for+17' correction 10,200.0 10,242.0 04:06 04:18 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T RBIH to mill cement 10,242.0 12,492.0 04:18 04:48 8/18/2017 8/18/2017 3.00 SLOT WELLPR MILL T 12490', Mill, 1.7 BPM @ 3320 PSI FS, 12,492.0 12,550.0 04:48 07:48 BHP=3267, RIW=9.3K. Multiple stalls passing through jewelry. 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Wiper trip up hole 1000'. PUW=52k. 12,550.0 12,550.0 07:48 08:18 8/1812017 8/18/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,550.0 12,576.0 08:18 09:18 WOB=1.6k, annular-3315 psi, circ=3700 psi. 8/18/2017 8/18/2017 1.40 SLOT WELLPR MILL T Tag D Profile nipple at 12,576' Mill 12,576.0 12,576.0 09:18 10:42 through with 6 stalls. 8/18/2017 8/18/2017 0.80 SLOT WELLPR MILL T Mill 9' below profile nipple. 1.7 bpm, 12,576.0 12,585.0 10:42 11:30 WOB=1.5k, annular-3340 psi, circ=3720 psi. Stalls at 12,582. Pickup through nipple with pumps off. ' No over pulls. 8/18/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Wiper up hole. 12,585.0 10,200.0 18/18/2017 1130 12:00 Page 13151 Report Printed: 9127/2017 Operations Summary (with Timelog Liepths) 3M-27 • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur(M) Phase Op Cade ACGvOy Code Time P -T -X Operation start Depth(N(a) End Depth (fiKa) 8/18/2017 8/18/2017 0.70 SLOT WELLPR MILL T Tie -In. +6.5' Correction. RIH to 10,200.0 12,300.0 12:00 12:42 logging depth. 8/18/2017 8/18/2017 0.30 SLOT WELLPR MILL T Log CCL from 12,300'to 12585' 12,350.0 12,589.0 12:42 13:00 8/18/2017 8/182017 2.50 SLOT WELLPR MILL T POOH. Open EDC at 8975'. Close 12,589.0 73.6 13:00 15:30 EDC for Agitator test. Test Agitator at 307'. Goosneck vibrating. Re -Open EDC. 8/18/2017 8/182017 1.00 SLOT WELLPR MILL T PJSM. Verify well is static. Un -Stab 73.6 0.0 15:30 16:30 injector. LD BHA #9. Gauge mill 2.76" No -Go. Discuss next BHA with town. 8/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T PU BHA #10. Re -Run 2.76" D331 0.0 71.9 16:30 17:06 Ridge Set, Hailey Under Reamer with 2.875" banana blades, BOT motor, 2.73" stabilizer, BOT jars. Replace stripper packing. Stab injector. 8/18/2017 8/18/2017 2.00 SLOT WELLPR MILL T RIH with EDC open. 71.9 10,200.0 17:06 19:06 8/182017 8/18/2017 0.20 SLOT WELLPR MILL T Log tie in point for +16'correction 10,200.0 10,260.0 19:06 19:18 8/182017 8/18/2017 0.50 SLOT WELLPR MILL T Continue in well 10,260.0 12,569.0 19:18 19:48 8/182017 8/18/2017 0.10 SLOT WELLPR MILL T Tag up @ 12569, Pull up to break 12,569.0 12,559.0 19:48 19:54 over, PUW=51 K, P/U 10 mpre feet .8/18/2017 8/192017 4.10 SLOT WELLPR MILL T Close ECD, Pring pumps online @ 1.7 12,559.0 10,397.0 19:54 00:00 BPM @ 4990. High vibration. Reduce rate to 1.5 BPM @ 4400 PSI. Vibration managable, Ream uphole @ 10 FPM. See additional motor work @ 12345, 12332, 12323, 12279, 12157, and 12140 8/192017 8/19/2017 2.30 SLOT WELLPR MILL T Continue reaming up @ 10 FPM, 1.5 10,397.0 9,100.0 00:00 02:18 BPM @ 4400 PSI FS, Ream up to orginal TOC, Pump 5 X 5 sweeps, Open edc 8/19/2017 8/192017 1.60 SLOT WELLPR MILL T Trip out of well, EDC open 9,100.0 101.0 02:18 03:54 8/192017 8/19/2017 1.00 SLOT WELLPR MILL T At surface, Flow check well, PJSM lay 101.0 0.0 03:54 04:54 down BHA on dead well, U/reamer arms at 2.75" lower and 2.78" upper 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T M/U BHA #11 with 2.79 NoGo D331 0.0 74.6 04:54 05:54 mwith ridge cutters on straight BOT motor 8/19/2017 8/19/2017 2.70 SLOT WELLPR MILL T RIH. Shallow test Agitator at 328'. Tie 74.6 12,579.0 05:54 08:36 -In +21' correction. Tag D -Nipple at 12,579' 8/19/2017 8/192017 1.20 SLOT WELLPR MILL T Dress up D -Nipple. 1.7 bpm. Free 12,576.0 12,587.0 08:36 09:48 Spin: 840 psi. High vibration. 1 Stall. Tag TD. Drift back through minimum rate. Make 7 down reaming passes. 8/192017 8/19/2017 2.20 SLOT WELLPR MILL T POOH. Shallow test agitator. 12,587.0 102.0 09:48 12:00 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T Verify well is static. PJSM. Un -Stab 102.0 0.0 12:00 13:00 Injector. LD BHA #11. Gauge mill 2.75" No Go. 8/19/2017 8/19/2017 1.50 SLOT WELLPR MILL T Discuss next BHA with town. PU BHA 0.0 74.7 13:00 14:30 #12, 2.80" slick D331. Check packing in stripper. Stab Injector. Page 14151 Report Printed: 9/2 712 01 7 Operations Summary (with Timelog L7epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SmtlTme Ertl Imre our (nr) Phase Op Cotls A Vity cmie Time P -T -X Operation start ptl(B)rh EM De Wh sl 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T RIH. Shallow test Agitator at 380'. Tie 74.7 12,587.0 14:30 16:36 -In +20' correction. pass through D - Nipple at 12577, Tag bottom @ 12,587 8/19/2017 8/19/2017 1.80 SLOT WELLPR MILL T Make multiple passes through nipple 12,587.0 12,580.0 16:36 18:24 area, 5. Dry drift nipple area - good 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T POOH, stop and open EDC @ 12556 12,580.0 95.0 16:24 20:30 8/19/2017 8/19/2017 0.50 SLOT WELLPR MILL T At surface, Flow check well, Lay down 95.0 0.0 20:30 21:00 BHA #12, Mill out @ 2.79 NoGo 8/19/2017 8/19/2017 1.30 PROD1 RPEQPT PULD P Make up BHA # 13 with new D-331 0.0 68.5 21:00 22:18 slick gauge mill, .9° AKO motor and agitator, M/U to coil and surface test, Inspect packoffs 8/19/2017 8/20/2017 1.70 PROD1 RPEQPT TRIP P Trip in hole, BHA #13 pilot hole 68.5 8,660.0 22:18 00:00 milling, 700'shallow test agitator- . good. Continue in 8/20/2017 8/20/2017 0.30 PROD1 RPEQPT TRIP P Continue tripping in well 8,660.0 10,200.0 00:00 00:18 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT DLOG P Log Gamma tie in for+15.5', 10,200.0 10,249.1 00:18 00:30 8/20/2017 8/20/2017 0.70 PROD1 RPEQPT TRIP P Continue trip in, Bring pump online @ 10,249.1 12,588.0 00:30 01:12 12544. Clean pass through milled D nipple area 8/20/2017 8/20/2017 6.50 PRODi RPEQPT MILL P Tag up @ 12588 and mill ahead, 1.7 12,588.0 12,716.0 01:12 07:42 BPM @ 3588 PSI FS. Stall and hard going @ 12598. Call 7" contact. Had to roll TF to 200° to get milling. 12599' roll TF back to 20R, ROP 20-25 FPH with - 2K DHWOB. Stalls at 12,703' and 12,705'. Orienter loosing high side at 12708' Suspect magnetic interference. Lock orienter 20R. 8/20/2017 8/20/2017 0.40 PRODt RPEQPT MILL T Injector coupling separating again. 12,716.0 12,589.0 07:42 08:06 Pickup into tubing tail to repair. 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT MILL T RIH back to bottom. 12,589.0 - 12,716.0 08:06 08:12 8/20/2017 8/20/2017 3.60 PROD1 RPEQPT MILL P BOBM. 1.7 bpm, WOB=2k, 12,716.0 12,755.0 08:12 11:48 Annular -3510 psi, Pump=4090 psi. Odenter locked based on internal highside loolface. 3 stalls at 12,730'. Pickup and re -verify toolface. Difficulty working past 12,730' ROP returned to 20'/hr after passing. TD pilot hole at 12,755' 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P POOH to back ream transition. 12,755.0 12,603.0 11:48 11:54 PUW=48k. 8/20/2017 8/20/2017 0.30 PROD1 RPEQPT REAM P Orient low side. Back ream transition. 12,603.0 12,584.0 11:54 12:12 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT TRIP P TIH. HOT still giving erratic readings 12,584.0 12,755.0 12:12 12:24 at 12,619' and 12,708'. Pump 5 x 5 sweep at TD. 8/20/2017 8/20/2017 0.60 PROD1 RPEQPT CIRC P PUH into tubing tail. Wait for sweeps 12,755.0 12,476.0 12:24 13:00 to surface. 8/20/2017 8/20/2017 0.40 PROD1 RPEQPT DLOG P Dry drift from tubing tail into pilot hole. 12,476.0 12,755.0 13:00 13:24 Tie -In with K1 marker. Zero Correction. 1 k set downs 12,595' and 12,615'. Tag TD. Page 15151 Report Printed: 9127/2017 .. Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten rune End Time OW (hr) Phase op c.deStan Activity Coad Tim P -T -X operation Deirm (ttKB) End Depth(itl(B) 8/20/2017 8/20/2017 1.50 PROD1 RPEQPT REAM P Back ream from 12,615'to tubing tail. 12,755.0 12,584.0 1324 14:54 Dry drift second time: I weight at 12,595' and 0.5k at 12,615'. Back ream from 12,615' to tubing tail. Dry drift third time. PUH. Ream down at 57min, back ream up. Dry drift fourth time. Weight bobble less than 0.75k. 8/20/2017 8/20/2017 2.00 PROD? RPEQPT TRIP P POOH. Shallow test Agitator at 580'. 12,620.0 109.0 14:54 16:54 Good test. 8/20/2017 8/20/2017 1.80 PRODt RPEQPT PULD P PJSM. Verify well is static. Unstab 109.0 0.0 16:54 18:42 Injector. LD BHA #13. Gauge Mill: 2.80 No Go. 8/20/2017 8/20/2017 1.00 PROW RPEQPT PULD P PJSM, WU BHA #14 HES caliper, 0.0 24.6 18:42 19:42 M/U to coil and surface test caliper. -8/20/2017 8/20/2017 2.30 PROD1 RPEQPT TRIPP RIH BHA #14 pilot hole caliper run 24.6 12,500.0 19:42 22:00 8/20/2017 820/2017 0.20 PROD1 RPEQPT DLOG P Tie into K1 for+19.3 12,500.0 12,658.0 22:00 22:12 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P Continue in well 12,658.0 12,744.0 22:12 22:18 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT CLOG P PUH logging pilot hole 1st run, 12,744.0 12,500.0 22:18 22:24 PUW=52K 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P Trip back to bottom 12,500.0 12,744.0 22:24 22:30 8/202017 8/20/2017 1.30 PROD1 RPEQPT DLOG P PUH logging to 8900, PUW=52K 12,744.0 8,900.0 22:30 23:48 8120/2017 8/21/2017 0.20 PROD1 RPEQPT TRIP P End of logging pass, Close caliper 8,900.0 8,503.0 23:48 00:00 fingers, Trip out of well 8/21/2017 8121/2017 1.50 PROD1 RPEQPT TRIP P Continue tripping out with HES caliper 8,503.0 67.0 00:00 01:30 8/21/2017 8/21/2017 0.30 PROD? RPEQPT PULD P PJSM, Lay down BHA #14 on dead 67.0 0.0 01:30 01:48 well 8/21/2017 8/21/2017 1.20 PROD1 RPEQPT PULD P PJSM, WU BHA#15, Whipstock with 0.0 74.0 01:48 03:00 OH anchor, M/U to coil and surface test 8121/2017 8/21/2017 2.40 PROD1 RPEQPT TRIP P RIH w/ Whipstock 74.0 12,600.0 03:00 05:24 8/21/2017 8/21/2017 0.10 PROW RPEQPT DLOG P Log K1 for +15.6 12,600.0 12,625.0 05:24 05:30 8/21/2017 821/2017 0.70 PROD1 RPEQPT TRIP P Continue to setting depth, PUW=49K, 12,625.0 12,722.7 05:30 06:12 continue up hole to 12695 trying to get orientation to clear up. PUH to 12635, RBIH to 12655'. tool seems stable, RBIH to set depth 12,722.7. Using internal TF. Close EDC. Pumps on, See tool shift @ 3700 PSI, DHWOB to 2.02K. Set down 2.5K - Good. 821/2017 8/21/2017 2.80 PROD1 RPEQPT TRIP P Open EDC. POOH. 12,722.7 100.0 06:12 09:00 8/21/2017 8/21/2017 0.20 PROD1 RPEQPT CTOP T Observe CT indention at 79.5' from 100.0 100.0 09:00 09:12 whip end. Photograph damage. 8/21/2017 8/21/2017 0.80 PROD1 RPEQPT PULD P PJSM. Verify well is static. Un -Stab 100.0 0.0 09:12 10:00 injector. LDBHA#15. 8/21/2017 8/21/2017 1.00 PROD1 RPEQPT CIRC P Close master valve. PU nozzle. Re- 0.0 0.0 10:00 11:00 Stab injector. Jet out stack and surface lines. Page 16151 ReportPrinted: 9/27/2017 . Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM Tune End Time om(hr) PhaseStart op Cafe A Ory Com Time P -T -X opemban Depth (m<13) Eel Depth(MI®) 8121/2017 8/21/2017 1.50 PROD? RPEQPT CIRC P Un -stab injector. Grease tree valves. 0.0 0.0 11:00 12:30 Install test joint cycle rams and circulate citric acid through stack. Pull test joint cycle rams and circulate citric acid followed by fresh water. Install BOP test cap. 8/21/2017 8/21/2017 0.80 PROD1 RPEQPT BOPE P PJSM. Begin BOP lest at 12:30 0.0 0.0 12:30 13:18 hours. Witness waived by AOGCC (Jeff Jones). Tests to 250 psi low, 42000 psi high. Attempt shell test. Regrease C5. Replace bleeder on C4. 8/21/2017 8/21/2017 1.60 PROD1 RPEQPT BOPE P Test #1(Upper Swab): Pass 0.0 0.0 13:18 14:54 Test #2 (Obsolete) Test #3 (Lower Blind/Shear, TV2): Pass Test #4 (TV1): Pass Test #5 (Upper Blind/Shear, 61, B5, C4, C5, C8, C12, R1, BL1): Pass Test #6 (C3, C6, C7, C11, B2, B6, T2): Fail 8/21/2017 8/21/2017 0.60 PROM RPEQPT BOPE T Re -Grease C7 and C11. 0.0 0.0 14:54 15:30 Re -Test #6: Pass 8/21/2017 8/21/2017 2.90 PROM RPEQPT BOPE P Test #7 (Choke D, Choke C): Pass 0.0 0.0 15:30 18:24 (1500 psi / Function) Test #8 (C2, C10, T1): Pass Test #9 (R2, BL2, Ct, Cg): Pass Test #10 (134, B8, R3, BL3): Pass . Test #11(B3, 87): Pass Remove tree cap. Install test joint and fill. Test gas alarms: Pass Test #12 (Annular): Pass (2500 psi) . Test #13 (Upper 2-3/8, Upper TIW): Pass Test #14 (Lower 2-3/8): Pass Test #15 (Lower Pipe/Slip): Fail 8/21/2017 8/21/2017 0.60 PROD1 RPEQPT BOPE T Cycle ram. 0.0 0.0 18:24 19:00 Re -Test #15: Pass 8/21/2017 8/21/2017 2.10 PROD1 RPEQPT BOPE P Test #16 (Upper Pipe/Slip, Lower 0.0 0.0 19:00 21:06 TIW): Pass Accumulator recharge: Pass Remove test joint. Re -Stab Injector. Test inner reel valve and stripper: Pass BOP test complete. Blow down drilling choke. 8/21/2017 8/21/2017 0.90 PROD1 RPEQPT CTOP T LD nozzle, blind sub, and LOC. Boot 0.0 0.0 21:06 22:00 wireline. Stab injector. Pump slack backwards. Un -stab injector. 8/21/2017 812212017 2.00 PRODt RPEQPT CTOP T PJSM. Cut 193' of coil to remove 0.0 0.0 22:00 00:00 damage. Cut 88' pipe to find wire 8/22/2017 8/22/2017 2.00 PROD1 RPEQPT CTOP T Continue making up coil tubing 0.0 0.0 00:00 02:00 connector, Pull test to 35K - Good. M/U UCC, Test wire (>550 Mohms /77.4 Ohmes). Fluid pack coil and pressure lest CTC and UQC to 4450 PSI 8/22/2017 8/22/2017 0.50 PROD? RPEQPT CTOP T Skid back injector / Run pipe into pipe 0.0 0.0 02:00 02:30 shed inspecting gripper blocks - Chains for damage or foreign objects Page 17151 ReportPrinted: 9/2 712 01 7 . Operations Summary (with Timelog uepths) 3M-27 C�onocoPhilfips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time Entl rme our Plisse Op Cade Ad,* Dixie Time P -T -X Operation d DePM 0 (11 0) End tie m p ftK 8/22/2017 8/22/2017 1.30 PROD1 WHPST PULD P PJSM, M/U P/U BHA# 16 Window 0.0 74.33 02:30 03:48 milling BHA with .6° motor, 2.79 string reamer, and 2.80 dimond window mill, Make up to coil and surface test - good 8/22/2017 8/22/2017 2.30 PROD1 WHPST TRIP P RIH, EDC open, Pumping 1 BPM 74.3 12,583.0 03:48 06:06 8/22/2017 8/22/2017 0.70 PROD1 RIGMNT TRIP T Inspect coupler/Tighten 12,583.0 12,583.0 06:06 06:48 8/22/2017 8/22/2017 0.10 PROD1 WHPST TRIP P Continue in well 12,583.0 12,600.0 06:48 06:54 8/22/2017 8/22/2017 0.10 PROD1 WHPST CLOG P Log K1 for+15.5' 12,600.0 12,628.0 06:54 07:00 8/22/2017 8/22/2017 0.70 PROW WHPST TRIP P Continue in well displaoeing used 12,628.0 12,713.0 07:00 07:42 8.8ppg PwrPro tripping in, stop @ 12651 and Gose EDC, Dry tag whipstock @ 12713. Having tool face issues. go to MWD internal loolface 8/2212017 8/22/2017 4.80 PROD1 WHPST MILL P Milling window, 12713', 1.6BPM @ 12,713.0 12,719.0 07:42 12:30 3685 PSI FS, BHP=3753 8/2212017 8122/2017 3.40 PROD1 WHPST MILL P Call bottom of window 12719, Milling 12,719.0 12,735.0 12:30 15:54 rathole 8/22/2017 8/22/2017 2.50 PROD1 WHPST REAM P At bottom of rat hole, ream window 12,735.0 74.0 15:54 18:24 per procedure, PUW=40K As drilled, 30° ROHS, 30° LOHS, 180° ROHS 8/22/2017 8/22/2017 3.00 PRODt WHPST TRIP P POOH, Marks and Gouge on coil, take 74.0 74.0 1824 2124 pictures, and upload to s:drive. 8/22/2017 8/22/2017 0.70 PROD1 WHPST OWFF P At surface, check well for flow, PJSM 74.0 74.0 21:24 22:06 8/22/2017 8/22/2017 1.60 PROD1 WHPST PULD P PUD & LD Window milling BHA, 74.0 0.0 22:06 23:42 - Window Mill 2.78 no-go, string mill 2.79 no-go 8/22/2017 8/23/2017 0.30 PRODt DRILL PULD P PU/MU Build Section BHA# 17 0.0 0.0 23:42 00:00 8/23/2017 8/23/2017 0.50 PROD1 DRILL PULD P Continue. PU/MU/ PD build section 0.0 0.0 00:00 00:30 BHA# 17 8/23/2017 8/23/2017 1.00 PROD1 DRILL PULD T Scope change, kink in slick line. 0.0 0.0 00:30 01:30 PJSM, swap to ODS PDL. 8/23/2017 8/23/2017 1.50 PROD1 DRILL PULD P Continue PD Buld BHA# 17 0.0 72.2 01:30 03:00 8/23/2017 8/23/2017 0.20 PRODt DRILL PULD P Surface test BHI tools (good test), 72.2 72.2 03:00 03:12 stab INJH, tag up, reset counters 8/23/2017 8/23/2017 2.30 PROD1 DRILL TRIP P RIH 72.2 12,585.0 03:12 05:30 8/23/2017 8/23/2017 0.20 PROD1 DRILL DLOG P Log K1 for+20.5' 12,585.0 12,633.0 05:30 05:42 1 8/23/2017 8/23/2017 0.20 PROW DRILL TRIP P Continue in well, Close EDC @ 12,633.0 12,735.0 05:42 05:54 12677, PUW=44K, Clean pass through window, Tag up at 12735 ' 8/23/2017 8/232017 1.80 PRODt DRILL DRLG P 12735', Drill, 1.8 BPM @ 4375 PSI 12,735.0 12,808.0 05:54 07:42 FS, BHP=3846 823/2017 8/232017 0.20 PROD1 DRILL WPRT P PUH to tie in and log RA, PUW=42K 12,808.0 12,600.0 07:42 07:54 8/232017 823/2017 0.10 PROD1 DLOG P Lag K1 for -1' RIH and log RA @ 12,600.0 12,730.0 07:54 08:00 JDRILL 12719, TOWS=12712.5 8/23/2017 8/23/2017 0.30 PROD1 DRILL WPRT P RBIH to drill 12,624.0 12,808.0 08:00 08:18 Page 18151 Report Printed: 9/2 712 01 7 Operations Summary (with Timelog jepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Star) Tire End Time Dur (hr) Phase Op code Activity Code Time P -T -X Operation S� Deptir (BKB) End Depth WEr 8/23/2017 8/23/2017 2.20 PROD1 DRILL DRLG P 12808', Drill ahead, 1.8 BPM @ 4352 12,808.0 12,818.0 08:18 10:30 PSI FS, BHP=3902 8/23/2017 8/2312017 6.50 PROD1 DRILL DRLG P PUW 40 k, OBD 1.8 bpm at 4318 psi 12,818.0 12,950.0 10:30 17:00 FS, BHP 3,897, IA 0, OA 483 812312017 8/23/2017 2.50 PROD1 DRILL TRIP P PUH slowly until sweep out the bit, 12,950.0 72.2 17:00 19:30 POOH 8/23/2017 823/2017 1.15 PROD1 DRILL PULD P PJSM, PUD R LD build section BHA 72.2 0.0 19:30 20:39 8/23/2017 8123/2017 1.50 PROD1 DRILL PULD P PU1MU/PD lateral section BHA, BHA# 0.0 78.2 20:39 22:09 18, surface test tools (good -test) 8/23/2017 8/2412017 1.85 PROD1 DRILL TRIP P Tag up, reset counters, RIH 78.2 8,500.0 22:09 00:00 8/24/2017 824/2017 0.50 PROD1 DRILL TRIP P Continue RIH 8,500.0 12,595.0 00:00 00:30 824/2017 824/2017 0.10 PROD1 DRILL DLOG P Log the K1 marker correction of plus 12,595.0 12,615.0 00:30 00:36 22', PUW 41 k, RIW 13 k 824/2017 8/242017 0.30 PROD1 DRILL TRIP P Continue in well 12,615.0 12,951.0 00:36 00:54 8/24/2017 8/242017 3.40 PRODt DRILL DRLG P OBD 1.8 bpm at 4,896 psi FS, BHP 12,951.0 13,360.0 00:54 04:18 3970, WHP 106, IA 0, OA 373, CTSW=12 k, DHWOB=2.0 k, R0P=100 fph 824/2017 8/24/2017 0.40 PROD1 DRILL WPRT P Wiperto 12980', PUW=41K 13,360.0 13,360.0 04:18 04:42 8124/2017 824/2017 9.00 PROD1 DRILL DRLG P 13360', Drill, 1.76 BPM @ 4785 PSI 13,360.0 13,760.0 04:42 13:42 FS, BHP=3843, RIW=10.8K, Encountered more Ankorite 8/242017 8/24/2017 0.75 PROD1 DRILL WPRT P 13760', Wiper to 12975', PUW=45K 13,760.0 13,760.0 13:42 14:27 8/2412017 8/24/2017 6.40 PROD1 DRILL DRLG P 13760', Drill, 1.8 BPM @ 5037 PSI 13,760.0 14,160.0 14:27 20:51 FS, BHP=3862 PSI, RIW=10K 8242017 8/24/2017 0.50 PROD1 DRILL WPRT P Wiper up hole to 12,725', PUW 45 k 14,160.0 12,735.0 20:51 21:21 8/24/2017 8/24/2017 0.25 PROD1 DRILL DLOG P Log the RA correction of plus 2.5' 12,735.0 12,766.0 21:21 21:36 8/242017 824/2017 0.50 PROW DRILL WPRT P Wiper back in hole, RIW 13 k 12,766.0 14,160.0 21:36 22:06 8/24/2017 825/2017 1.90 PRODI DRILL DRLG P BOBD 1.8 bpm at 3,908 psi FS, BHP 14,160.0 14,167.0 22:06 00:00 3,946, WHP 67, IA 0, OA 560, CTSW =11.3 k, DHWOB=2.9 k, ROP 2 fph 8/252017 8/25/2017 3.50 PROD1 DRILL DRLG P OBD, 1.8 bpm at 5,153 psi, 14,167.0 14,339.0 00:00 03:30 BHP=3,975, WHP=63, IA=O, OA=546, CTSW=4.4 k, DHWOB=2.9 k, ROP 60 fph 8/2512017 8/25/2017 3.30 PROD1 DRILL DRLG P OBD, 1.8 bpm at 5,395 psi, 14,339.0 14,560.0 03:30 06:48 BHP=3,975, WHP=55, IA=O, OA=569, CTSW=2.2 k, DHWOB=2.5 k, ROP=62 fph 8/25/2017 825/2017 0.70 PROD1 DRILL WPRT P 14560', Wiper to 13560', PUW=45K 14,560.0 14,560.0 06:48 07:30 8/2512017 8/25/2017 4.40 PROD1 DRILL DRLG P 14560', Drill 1.78 BPM @ 5100 PSI 14,560.0 14,875.0 07:30 11:54 FS, BHP=3956, Avg ROP 40-60 FPH, Encountered signs of ankorite with low to no ROP. Good weight transfer 8125/2017 8/25/2017 0.30 PROD1 DRILL WPRT P Pull Mini wiper, PUW=52K 14,875.0 14,875.0 11:54 12:12 Page 19151 Report Printed: 9/27/2017 .. Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Ttfne Log Start Tena Ertl Time our(hd Phase Op codeStart ArJirdy Code rime P -T -X Opeiadon Depth (W) End Depth (FtK8) 8/25/2017 8/25/2017 6.00 PROD1 DRILL DRLG P 14875', Drill, 1.75 BPM @ 5100 PSI 14,875.0 14,920.0 12:12 1812 FS, BHP=4002 8/25/2017 8/25/2017 0.25 PROD1 DRILL WPRT P BHA wiper 14,920.0 14,920.0 18:12 18:27 8/25/2017 8/25/2017 1.50 PRODi DRILL DRLG P BOBD, 1.8 bpm at 5,493 psi, 14,920.0 14,960.0 18:27 19:57 BHP=3,975, WHP=41, IA=O, OA=600, CTSW=10 k, DHWOB=2.7 k, ROP=22 fph 8/25/2017 825/2017 1.00 PROM DRILL WPRT P Wiper up hole to 13,960'(1000'), PUW 14,960.0 14,960.0 19:57 20:57 43 k 8/25/2017 8/26/2017 3.05 FROM DRILL DRLG P BOBD, 1.8 bpm at 3,972 psi FS, 14,960.0 14,994.0 20:57 00:00 BHP=4,024, WHP=O, IA=O, OA=605, CTSW=11.6 k, DHWOB=2.8 k, ROP=2 fph, TO lateral 8/262017 8/26/2017 1.50 FROM DRILL WPRT P Pump 10x10 sweep, perform swab 14,994.0 12,944.0 00:00 01:30 wiper, PUW 44 k 8/26/2017 8/26/2017 1.15 PROD1 DRILL WPRT P Notice increase of 600 psi diff while 12,944.0 92,577.0 01:30 02:39 wiper up hole thru build section, RBIH, tum TF 180° from drilled TF, diff is lower, perform 7 clean out passes, no change, continue wiper up hole thru window to 12,596', 8/262017 8/26/2017 2.00 PROD1 DRILL WPRT P Perform static pressure survey, 11.7 12,577.0 78.2 02:39 04:39 ppg (3,700 psi annular), Open EDC, POOH pumping max rate, filling trip sheet 8/26/2017 8/26/2017 0.50 FROM DRILL TRIP P Tag up at surface, inspect INJH, reset 78.2 78.0 04:39 05:09 counters. 8/262017 8/26/2017 2.80 PROW DRILL TRIP P Trip in hole, EDC open, Pumping 78.0 12,595.0 05:09 07:57 8262017 8/262017 0.10 FROM DRILL DLOG P Log Kt for+5.5, PUW=44K, Close 12,595.0 12,631.0 07:57 08:03 EDC 8/26/2017 8/26/2017 1.70 FROM DRILL TRIP P Continue in hole, clean through 12,631.0 14,960.0 08:03 09:45 window, Initial tag up @ 14960. Worked down to 14992. PUH waiting on beader liner pill. Hard time getting back in past 14960'. Call that bottom 8/26/2017 8/26/2017 3.10 PROD1 DRILL TRIP P Trip out pumping 12.OPPG beaded 14,960.0 98.0 09:45 12:51 liner running pill followed with 12 PPG completion fluid. Paint EOP flags Q 13150 & 10800' 8/262017 826/2017 0.30 PROM DRILL PULD P At surface, PJSM lay down BHA on 98.0 98.0 12:51 13:09 dead well, Flow check well - good 8126/2017 826/2017 1.10 PROM DRILL PULD P Break off injector anf skid back, Lay 98.0 0.0 13:09 14:15 down BHA #18 826/2017 826/2017 0.70 COMPZI CASING RURD P PJSM, R/U to run liner, service 0.0 0.0 14:15 14:57 elevators and top drive 8/262017 8/26/2017 4.25 COMPZI CASING PUTB P M/U BHA #19 with non ported 0.0 1,763.2 14:57 19:12 bullnose, 3 pup joints, Us slotted liner, 2 tracers T-165 & T940, 40 Jts slotted liner, Aluminum liner top billet 8/26/2017 82612017 2.50 COMPZI CASING RUNL P Test BHI Coiltrak tools (good test), tag 1,763.2 12,607.0 19:12 21:42 up, reset counters, RIH 8262017 8/262017 0.15 COMPZI CASING RUNL P EOP flag, no correction, PUW 42 k 12,607.0 12,607.0 21:42 21:51 8262017 8/26/2017 0.50 COMPZI CASING RUNL T Tighten Coupler on INJH 12,607.0 12,607.0 21:51 22:21 8/26/2017 8/26/2017 1.00 COMPZ1 CASING RUNL P Continue IH, RIHCTSW=12 k, 12,607.0 14,994.0 22:21 23:21 RIHDHWOB=O k Page 20151 Report Printed: 9/27/2017 .. Operations Summary (with Timeiog .Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Time End Time Dur(hr) Phaco Op cod. A VyCode Imre P.T.XOperation 5�De� (BKB) End Depth(flKB) 8/26/2017 8/26/2017 0.15 COMPZI CASING RUNL P Tag bottom at 14,996', PUW 51 k, 14,994.0 13,230.4 23:21 23:30 CTSW=51 k, DHWOB=minus 5.6 k, set back down, bring pump up to 1.7 bpm, 0.80 bpm rerturns, PUH, CTSW=38 k, DHWOB= 0 k, release liner on bottom. 8/26/2017 8/27/2017 0.50 COMPZI CASING TRIP P Remove liner length from BHA, POOH 13,230.4 9,945.0 23:30 00:00 8/27/2017 8/27/2017 1.25 COMPZI CASING TRIP. P Continue POOH wtih liner setting 9,941.0 44.2 00:00 01:15 tools, pumping 1.0 bpm at 2,288 psi 8127/2017 8/27/2017 0.50 COMPZI CASING OWFF P At surface, check well for flow( no- 44.2 44.2 01:15 01:45 flow), PJSM 8/2712017 8/272017 0.50 COMPZI CASING PULD P LD liner setting tools BHA# 19 44.2 0.0 01:45 02:15 8/27/2017 827/2017 0.50 PROD2 STK PULD P PU/MU kickoff/drilling BHA# 20 0.0 78.3 02:15 02:45 w/Hycalog Ct bi-center bit and agitator, surface test BHI Coiltrak tools (go test) 8/27/2017 8/27/2017 1.50 PROD2 STK TRIP P Tag up, reset counters, RIH, pumping 78.3 6,480.0 02:45 04:15 min rate 8/272017 827/2017 0.50 PROD2 STK CTOP T Tighten INJH coupler 6,480.0 6,480.0 04:15 04:45 8/272017 8/27/2017 0.90 PROD2 STK TRIP P Continue RIH 6,480.0 12,595.0 04:45 05:39 8/27/2017 8/27/2017 0.20 PROD2 STK DLOG P Log K1 correction of+5.5 12,595.0 12,620.0 05:39 05:51 827/2017 8/27/2017 0.10 PROD2 STK TRIP P Continue in well 12,620.0 12,700.0 05:51 05:57 8/27/2017 8/272017 1.70 PROD2 STK CIRC P Displace well back to 8.8 PPG 12,700.0 12,700.0 05:57 07:39 PwrPro, close EDC, PUW=46K 8/27/2017 8/27/2017 0.50 PROD2 STK TRIP P Continue in well, Clean pass through 12,700.0 13,232.0 07:39 08:09 window, Dry tag liner top billet 13232 8/27/2017 827/2017 0.70 PROD2 STK MILL P PUH, Bring on pumps @ 1.76 BPM Q 13,232.0 13,233.0 08:09 08:51 5350 PSI FS, BHP=3940. See motor work and DHWOB @ 13232, Mill aQ 1FPH 8272017 827/2017 0.60 PROD2 STK MILL P Go to 2 FPH time milling 13,233.0 13,234.0 08:51 09:27 8/27/2017 8/27/2017 0.40 PROD2 STK MILL P Go to 3 FPH time milling 13,234.0 13,235.0 09:27 09:51 8/27/2017 8/27/2017 0.80 PROD2 DRILL DRLG P 12235', Start drilling ahead, Had one 13,235.0 13,270.0 09:51 10:39 stall, reset and drill, 1.75 BPM @ 5350 PSI FS, BHP=3873 8/27/2017 8/27/2017 0.20 PROD2 DRILL WPRT P PUH to dry drift billet area, Set down 13,270.0 13,270.0 10:39 10:51 @ 13237, PUH then run through clean 8/272017 627/2017 3.40 PROD2 DRILL DRLG P 13270', Drill, 1.73 BPM @ 5400 PSI 13,270.0 13,660.0 10:51 14:15 FS, BHP=3927 8/272017 8/27/2017 0.40 PROD2 DRILL WPRT P 13660, Wiper to 13250, PUW=44K 13,660.0 13,660.0 14:15 14:39 8/27/2017 8/272017 1.00 PROD2 DRILL DRLG P 13660', Drill, 1.73 BPM @ 5680 PSI 13,660.0 13,722.0 14:39 15:39 FS, BHP=4022 8127/2017 8/27/2017 0.15 PROD2 DRILL WPRT P PUW 45 k, BHA wiper 13,722.0 13,722.0 15:39 15:48 8/27/2017 8/27/2017 5.00 PROD2 DRILL DRLG P BOBD, 1.74 bpm at 5,681 psi FS, 13,722.0 14,064.0 15:48 20:48 BHP=5,562, WHP=9, IA=O, OA=528, CTSW=4.5 k, DHWOB=2.2 k, ROP=42 fah Page 21151 ReportPrinted: 9/27/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Time EM Tone Dur (hr) Phase Op Code Activity Code Tsrre P -T,% Operztion Sled Depen (Po(m) End Depth (fIKB) 8/27/2017 8/27/2017 0.75 PROD2 DRILL WPRT P Wiper up hole to 13,300', PUW 44 k, 14,064.0 14,064.0 20:48 21:33 wiper back in hole, RIW=6 k 8/27/2017 8/28/2017 2.45 PROD2 DRILL DRLG P BOBD, 1.79 bpm at 6,045 psi FS, 14,064.0 14,212.0 21:33 00:00 BHP 4,074, WHP 8, IA=O, OA=528, CTSW=minus 1 k, DHWOB=1.5 k, ROP=90 fph - 14,187', DHWOB=3.5 k, CTSW=2.5 k, ROP=O, PUW 50 k, stack back down minus 15 k, PUW 72 k, pipe free, pull 200' wiper 8/28/2017 8/28/2017 1.75 PROD2 DRILL DRLG P OBD, 1.73 bpm at 6,430 psi, BHP 14,212.0 14,318.3 00:00 01:45 4074, WHP 0, IA 0, OA 532, CTSW= minus 1.7 k, DHWOB=2.2 k, ROP=55 k 8/28/2017 8128/2017 0.25 PROD2 DRILL WPRT P Short Wiper up hole to 14,159', PUW 14,318.3 14,318.0 01:45 02:00 42 k, HOT was against the slops, rotate TF 8/28/2017 8/28/2017 1.50 PROD2 DRILL DRLG P BOBO, 1.74 bpm at 5,319 psi, BHP 14,318.0 14,460.0 02:00 03:30 4,178, WHP 0, IA 0, OA 539, CTSW=6 k, DHWOB=1.3 k, ROP=110 fph - New Mud at the bit 14,333' ................ `"` Old Mud Stats: 1,931' DF, 0.9% DS 8/28/2017 8/28/2017 0.75 PROD2 DRILL WPRT P Wiper up hole for tie in, PUW 44 k 14,460.0 12,735.0 03:30 04:15 8/28/2017 8/28/2017 0.15 PROD2 DRILL DLOG P Log the RA correction of plus 5.5' 12,735.0 12,753.0 04:15 04:24 8/28/2017 8/28/2017 0.70 PROD2 DRILL WPRT P RIH, RIW 11 k 12,753.0 14,460.0 04:24 05:06 8/28/2017 8/28/2017 3.80 PROD2 DRILL DRLG P BOBD, 1.75 bpm at 5595 PSI FS, 14,460.0 14,700.0 05:06 08:54 BHP=4039, Pump 10 BBI beaded pill to evaluate weight transfer @ 14692. No difference. Surface weight @ -5K 8/28/2017 8/2812017 3.90 PROD2 DRILL DRLG P 14700, Drill aheadl.7 BPM @ 5595 14,700.0 14,860.0 08:54 12:48 PSI FS, BHP=4120 8/28/2017 8/28/2017 0.90 PROD2 DRILL WPRT P 14860', 1000' wiper, PUW=45K 14,860.0 14,860.0 12:48 13:42 8/28/2017 8/28/2017 0.60 PROD2 DRILL DRLG P 14860', Drill, 1.7 BPM @ 6096 PSI 14,860.0 14,882.0 13:42 14:18 FS, BHP=4099. Pressure is high across BHA. Circ pressure up 500 PSI. Reduce rate to 1.6 BPM @ 5740 PSI FS 8/28/2017 8/2812017 2.80 PROD2 DRILL TRIP T 14882, Lost differential pressure on 14,862.0 77.0 14:16 17:06 bottom, Trip out 8/28/2017 8/28/2017 1.90 PROD2 DRILL PULD T PUD BHA #20, Scope change, Floats 77.0 0.0 17:06 19:00 not holding. Power up coiltrak and closed EDC. Continue pressure undeploy 8/28/2017 8/28/2017 0.80 PROD2 DRILL CTOP T WU agitator to coil. Stab on well. 0.0 0.0 19:00 19:48 circulate through agitator. .5 BPM @ 1605 PSI with .5BPM out. Unstab injector and lay down agitator - 8/28/2017 8/28/2017 0.40 PROD2 DRILL BOPE P Perform Bi -weekly BOPE function test 0.0 0.0 19:48 20:12 - Good 8/28/2017 8/28/2017 1.80 PROD2 DRILL PULD T PD pre loaded BHA # 21 with .6' 0.0 62.6 20:12 22:00 motor, Re run bi center. No res tool or agitator, Surface test tool - Good. Page 22/51 Report Printed: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stat Tore ErMTrre Ga(M phase Op Code Activity Code Time P -T -X Operi (flKa) End Depth(fIKB) 8/28/2017 8/28/2017 1.50 PROD2 DRILL PULD T Identified hydraulic leak on lower 62.6 0.0 22:00 23:30 shear/ seal actuator, PJSM, PUD BHA #21, Nabors Tool Pusher dispatched mechanic to repair acctuator. 8/28/2017 8/29/2017 0.50 PROD2 DRILL EQRP T Prep for hydraulic leak repair, vac out 0.0 0.0 23:30 00:00 fluid in stack, lockouttlagout koomey unit. 8/2912017 8/29/2017 2.50 PROD2 DRILL EQRP T Continue repairing leak on lower blind 0.0 0.0 00:00 02:30 shear ram actuator ***Total Nabors NPT 4.5 hrs 8/29/2017 8/29/2017 1.15 PROD2 DRILL PULD T PJSM, PD drilling BHA# 21 0.0 62.5 02:30 03:39 8/29/2017 8/29/2017 2.25 PROD2 DRILL TRIP T RIH, with cleanout/confirm TD BHA# 62.5 12,595.0 03:39 05:54 21 with a 0.6° alto motor and no res tool. 8/29/2017 8/2912017 0.15 PROD2 DRILL DLOG T Lag K1 marker correction of plus 5.5' 12,595.0 12,621.0 05:54 06:03 8/2912017 8129/2017 1.00 PROD2 DRILL TRIP T Continue RIH 12,621.0 14,882.0 06:03 07:03 8/29/2017 8/29/2017 0.50 PROD2 DRILL CIRC P Confirm TD, line up and pump liner 14,882.0 14,882.0 07:03 07:33 pill, jogging pipe close to bottom . 8/29/2017 8/29/2017 3.00 PROD2 DRILL TRIP P POOH while laying in 12.0 ppg liner 14,882.0 62.2 07:33 10:33 running pill with alpine beads, PUW 44 it, painting EDP flags 8129/2017 8129/2017 0.50 PROM DRILL OWFF P At surface, check well for flow (no- 62.2 62.2 10:33 11:03 flow), PJSM 8/29/2017 8129/2017 0.50 PROM DRILL PULD P LD cleanout/confirm TO BHA# 21 on a 62.2 0.0 11:03 11:33 dead well 8/2912017 8/29/2017 0.25 COMM CASING PUTB P Prep rig floor for PU liner assembly, 0.0 0.0 11:33 11:48 PJSM 8/2912017 8/29/2017 3.25 COMPZ2 CASING PULD P MU AL1 Liner assembly, check BHI 0.0 1,710.5 11:48 15:03 check valves and pac-offs 8/29/2017 8/29/2017 0.75 COMPZ2 CASING PULD P PU1MU BHI CoilTrak tools, surface 1,710.5 1,776.3 15:03 15:48 test tools (good test) 8/29/2017 8/29/2017 2.40 COMM CASING RUNL P RIH, with AL1 liner assmebly BHA# 22 1,776.3 12,573.0 15:48 18:12 8/29/2017 8/29/2017 0.90 COMPZ2 CASING RUNL P Wt Check 43 k lbs, tie into window flag 12,573.0 14,597.0 18:12 19:06 for 2.42' correction. continue to RIH. SD @ 14,597', PU 52 k lbs, -10.9 it - WOB, continue to RIH. 8129/2017 8/2912017 0.10 COMM CASING RUNL P lie into flag while driving by for no 14,597.0 14,882.0 19:06 19:12 corection. SD @ 14883', stacked - IOk CT wt 2.6 k WOB 2.78k lbs. stage pump up to 1.5 bpm, CT 4321 psi. PU,Ct wt broke over at 38k lbs, WOB-3.471k lbs. Released Imer.bottom 14882' TOB 13150. 8/29/2017 8/29/2017 1.90 COMPZ2 CASING TRIP P Reset counters, POOH replacing pipe 14,882.0 70.0 19:12 21:06 voydage w KW. Open EDC once in caseed hole. continue to POOH. 8/2912017 8/29/2017 0.70 COMM CASING PULD P PJSM, at surface, flow check - Good, 70.0 0.0 21:06 21:48 unstab injector, Examine pipe, flat spot -24' back 0.13", @ - 17' back 0.90". Decision made to cut pipe / rehead. LD BHA # 22 over a dead well. Page 23151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time EM Time Dw (hr) Phase op code Ad ty cme Time P -T-% openew sten Depen (MB) End Depth (MB) 8/29/2017 8/3012017 2.20 COMPZ2 CASING CTOP P Cut 30' of pipe and rehead, pull test to 0.0 0.0 21:48 00:00 38k lbs - good, install upper Quick, PT to 4k psi - good. 8/30/2017 8/30/2017 1.20 PRODS STK PULD P PJSM, PU and deploy BHA #23, AL2 0.0 70.0 00:00 01:12 let drilling assembly, over a dead well. Stab injector, bump up, set counters 8/30/2017 8/30/2017 2.60 PRODS STK TRIP P RIH, shallow test agitator, came on 70.0 12,595.0 01:12 03:48 above 1 bpm, open EDC, continue to RIH. Baker drilling screen jumped from - 7000 feet to 13,000 feet for no - known reason. MWD cycled equipment and reset depths. 8/30/2017 8/30/2017 0.20 PRODS STK DLOG P Tie into K1 for+4' correction 12,595.0 12,633.0 03:48 04:00 8/30/2017 8/30/2017 1.25 PRODS STK DISP P Pull above TOC, open EDC, circ out 12,633.0 12,633.0 04:00 05:15 12.0 kill weight fluid. 8/30/2017 8/30/2017 0.25 PRODS STK TRIP P RIH, dry tag TOB at 13,150', PUH, 12,633.0 13;150.0 05:15 05:30 PUW 37 k - 8/30/2017 8/30/2017 2.50 PRODS STK KOST P Bring pump on 1.81 bpm at 5,215 psi, 13,150.0 13,157.0 05:30 08:00 BHP 3,966, WHIP 8, IA 0, OA 334, CTSW=12 k, DHWOB=0.4 k, kickoff billet as per RP, Dry drift billet area _ clean 8/30/2017 8/30/2017 4.50 PRODS DRILL DRLG P Drilling ahead, 1.8 bpm at 5,565 psi, 13,157.0 13,484.0 08:00 12:30 BHP 3,988, WHIP 0, IA 0, OA 417, CTSW=7 k, DHWOB=2.6 k, ROP=80- 120 fph 8/30/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper up hole to 12,750', PUW 50 k 13,484.0 12,750.0 12:30 13:00 8/30/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper back in hole, RIW 7 k 12,750.0 13,484.0 13:00 13:30 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P BOBD 1.8 bpm at 5,235 psi FS, BHP 13,464.0 13,700.0 13:30 16:30 3,959. WHIP 0, IA 0, OA 454, CTSW=3.6 k, DHWOB=2.6 k, ROP=40 fph 6/30/2017 8/30/2017 1.50 PROM DRILL DRLG P OBD 1.8 bpm at 5,377 psi, BPH 13,700.0 13,795.0 16:30 18:00 4,043, WHIP 0, IA 0, OA 485, CTSW=7 k, DHWOB=1.9 k, ROP=33 fph 8/30/2017 8/3012017 2.20 PRODS DRILL DRLG P OBD stall, PU Wt 52 k ran icon 13,795.0 13,875.0 18:00 20:12 something hard, ROP down to - 3 Whir, low diff, WOB - 3 k lbs, 13811' started to drill off, getting diff presure back. ROP increased after 13,814', caught bottoms up sample, lots of siderite . 8/30/2017 8/30/2017 0.30 PRODS DRILL WPRT P PU Wt 43 k lbs, Geo wiper, believe we 13,875.0 13,660.0 20:12 20:30 crossed fault, 8/30/2017 8/30/2017 0.30 PRODS DRILL WPRT P RBIH, S/D 13,810', short PU clean, 13,660.0 13,875.0 20:30 20:48 rolled toolface to as drilled- 310 ROHS, SD again 13,816', 3 k lbs, short Pu clean, RBIH still 330°ROHS, reduced rate to 0.3 BPM, slid right through. Page 24151 Report Printed: 9127/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM Depth Stan Time EM Time Durh Dur(ho Phase Op Cotle Activity Code Time P -T -X Operation (ftKB) Entl Deplh(f1Ka) 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P 1.79 bpm in, 1.70 bpm out, Ct 5350 13,876.0 13,971.0 20:48 23:48 psi, free spin diff 1000 psi, CT RIH wt 9k. OBD, WOB 1.5 k lbs, CT wt 6.5 k lbs, ROP 30 ft/hr. Pumped 5 x 5 sweep pre wiper tirp CT wt -2.9 k lbs, 1 k lbs WOB, ROP 45 ft/hr 8/30/2017 8/31/2017 0.20 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2 - 770' 13,971.0 13,512.0 23:48 00:00 chasing sweeps uphole. 8/31/2017 8131/2017 0.10 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2-770' 13,512.0 13,200.0 00:00 00:06 chasing sweeps uphole. 8/3112017 8/31/2017 0.30 PRODS DRILL WPRT P RBIH, RIH Wt 7 k lbs, RIH Wt 8 k 13,200.0 13,971.0 00:06 00:24 8/31/2017 8/31/2017 3.80 PRODS DRILL DRLG P 1.81 bpm in, 1.72 bpm out, Ct 5480 13,971.0 14,078.0 00:24 04:12 psi, free spin diff 1010 psi , OBD, CT wt 4 k lbs, WOB 2 k lbs. ROP 58 fUhr. Excess surface weight short lived. CT weight fell to -3 k lbs w 2 k WOB in 20 min, ROP 30-15 tU hr 8/31/2017 8131/2017 0.20 PRODS DRILL WPRT P PU Wt 42 k lbs, Wipe 100' 14,078.0 14,078.0 04:12 04:24 8/31/2017 8/31/2017 2.00 PROD3 DRILL DRLG P 1.82 bpm in, 1.78 bpm out, CT wt 6 k 14,078.0 14,111.0 04:24 06:24 lbs, WOB 1.8 k lbs. CT weight fell quicly to -4 klbs. ROP -16 ft/hr 8/31/2017 8/31/2017 0.15 PRODS DRILL WPRT P BHA wiper PUW 47 k 14,111.0 14,111.0 06:24 06:33 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P BOBD, 1.8 bpm at 4,886 psi, BHP 14,111.0 14,189.0 06:33 10:48 4,093, WHP 0, IA 0, OA 567, CTSW= minus 5 k, DHWOB=1.8 k, ROP 15 fph, start new mud down coil 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,950 psi, BHP 14,189.0 14,280.0 10:48 15:03 3,965, WHP 0, IA 0, OA 568, CTSW= minus 5.9 k, DHWOB=1.3 k, ROP 15- 28 fph """ New mud at the bit 14,189' 8/31/2017 8/31/2017 0.75 PRODS DRILL WPRT P Wiper up hole for tie in. PUW 45 k, 14,280.0 12,595.0 15:03 15:48 14,100' pull heavy 73 k 8/3112017 8/31/2017 0.15 PRODS DRILL DLOG P Log the K1 correction of plus 7.5', seat 12,595.0 12,626.0 15:48 15:57 pump 8/31/2017 8/31/2017 1.00 PRODS DRILL WPRT . P RBIH, Work through tight area Q 12,626.0 14,270.0 15:57 16:57 14,100 8/31/2017 8/31/2017 0.70 PRODS DRILL WPRT T PU to clean up tight section. Stuck 14,270.0 12,691.0 16:57 17:39 multiple times 14,100 - 14,000'. Stack negative down, Pull 75 fUmin, up to 78k surface weight, 44 k was clean pickup. Able to pull free . Pump multiple 5x5 sweeps. Weights clenaed up above the fault @ 13,600. Page 25151 Report Printed: 9/2 712 01 7 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time FM Time OiW(hr) Phase Op Cade Activity Code Time P -T -X Operation Stan Depth (MB) EM OepN (flKe) 8/3112017 8/31/2017 1.00 PRODS DRILL CIRC T Open EDC, pumping 1.84 bpm, as the 12,691.0 12,670.0 17:39 18:39 bottoms up landed from when we war stuck large amounts of cuttings returned to the shaker. No rocks, all fines. All twenty valleys on the shaker full to the top. Sweeps landed and solids returns were greatly deminished from previous. Pump two more sweeps timed out for clean out run. PU W144 k lbs. Close EDC 8/31/2017 8/31/2017 0.40 PRODS DRILL WPRT T RBIH, 12,670.0 13,807.0 18:39 19:03 - 8/31/2017 8/31/2017 2.50 PRODS DRILL WPRT T Pu Wt 45k lbs, Pull out of hole wiping 13,607.0 78.0 19:03 21:33 to the window chasing sweeps to surface. Open EDC. Contiue out of hole chasing sweeps. Called our Baker tool hand w billet and open hole anchors 8/31/2017 8/31/2017 1.50 PROD3 DRILL PULD T Bump up, PUD BHA# 23. 78.0 0.0 21:33 23:03 8/31/2017 9/1/2017 0.95 PRODS STK PULD T PU & PD BHA #24 0.0 78.0 23:03 0000 9/1/2017 9/1/2017 1.50 PROD3 STK PULD T Crew Change, PJSM, contiune to PU 0.0 78.0 00:00 01:30 & PD BHA #24 9/1/2017 9/1/2017 2.90 PRODS STK TRIP T Bump up, set counters, RIH w 78.0 12,610.0 01:30 04:24 anchored billet. 9/1/2017 9/1/2017 0.20 PRODS STK DLOG T Tie into the K1 for +6'correction 12,607.0 12,633.0 04:24 04:36 911/2017 9/1/2017 0.70 PRODS STK TRIP T Pu W142 k lbs, S/D pumps, Gose 12,633.0 13,347.0 04:36 05:18 EDC. Continue to RIH, S/D multiple times 13,272', 3k Ibs bounced through 13,329', 3k lbs bounced through 13,347',4.6 k PU Wt 44 k 20-251Vmin 13,347',4.8 k PU Wt 48 k 13,347', 4 k PU Wt 50 k Orient slip to as drilled, 240° ROHS S/D 13,345'3k PU Wt 48k 9/1/2017 9/1/2017 0.40 PRODS STK TRIP T PUH, 13,347.0 12,669.0 05:18 05:42 9/1/2017 9/1/2017 0.75 PRODS STK WAIT T Open EDC, maintain bottom hole 12,669.0 12,562.0 05:42 06:27 pressure. while creeping up hole, wait on orders for new settimg depth 9/1/2017 9/1/2017 0.35 PRODS STK TRIP T Close EDC, RIH notice counters not 12,562.0 12,562.0 06:27 06:48 working, RIH for tie in 9/1/2017 911/2017 0.25 PRODS STK DLOG T Log the K1 correction of plus 36.5' 12,562.0 12,642.0 06:48 07:03 9/112017 9/1/2017 0.50 PRODS STK WAIT T Confer with town team on billet setting 12,642.0 12,642.0 07:03 07:33 depth 9/1/2017 9/1/2017 3.25 PRODS STK TRIP T POOH, for cleanout run, @ 500' PJSM 12,642.0 73.3 07:33 10:48 for PUD Billet BHA# 24 9/1/2017 9/1/2017 1.25 PRODS STK PULD T PUD, Billet BHA# 24 73.3 0.0 10:48 12:03 9/112017 9/1/2017 0.75 PRODS DRILL WAIT T Wait on Concretion Bit via/KDTH 0.0 0.0 12:03 12:48 9/1/2017 9/1/2017 1.25 PRODS DRILL PULD T PJSM, PD cleanout/drill BHA# 25 0.0 78.2 12:48 14:03 Page 26151 Report Printed: 912712017 Operations Summary (with Timelog depths) kL 3M-27 coinocophillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time EW Tee Dr(hr) Phase Op cmie Activity Ootle Time P-T-X Opembm, Sfah Depth N End Depth (f 9/1/2017 9/1/2017 2.50 PRODS DRILL TRIP T RIH, w/cleanout BHA# 24 78.2 12,600.00.0 14:03 16:33 9/1/2017 9/1/2017 0.20 PROD3 DRILL DLOG T Tie into the K1 for a +5.5' correction 12,600.0 12,630.0 16:33 16:45 9/1/2017 9/1/2017 0.40 PROD3 DRILL TRIP T Wt Ck 40 k lbs, coninue to RIH 12,630.0 13,300.0 16:45 17:09 9/1/2017 9/1/2017 0.70 PROD3 DRILL REAM T 1.80 bpm, Ct 4800 psi, free spin diff 13,300.0 13,819.0 17:09 17:51 830 psi. SID @ 13,819'stael weight w motor work. PU 43 k Ibs, sticky; started 5x5 sweep. RBIH 9/1/2017 9/1/2017 0.20 PROD3 DRILL REAM T 1.80 bpm, CT 4861, psi, free spin 819 13,819.0 13,700.0 17:51 18:03 psi, RIH wt 10 it lbs Tag up 13,813', work at 3 ft/min to 13,828' PU 40k Ibs, some neg WOB, motor work Crew change 9/1/2017 9/1/2017 1.60 PROD3 DRILL REAM T RBIH SID @ 13,814 drilled off, 13,700.0 13,837.0 18:03 19:39 continue to RIH, pumping 5x5 sweeps one in as one exits the nozzle. Drill to 13,830'3+ k WOB, PU 47k wipe to above the fault, lots of silt at the shaker RBIH, SID at 13,814 work past, 13,834' hard bottom +3 k WOB, Work slowly to 13,837, +3k WOB, PU 58 k, wipe to above fault, RBIH Consult wt town. Scope change to prep for billettopen hole side track 9/1/2017 9/1/2017 0.60 PROD3 DRILL WPRT T PU 47k, PUH as 5x5 sweep exiling 13,837.0 12,550.0 19:39 20:15 the nozzle, to above TOC, questions re. TOC in tubing, under reamed from 12,559' up (tagged w underreamer @ 12,569') and drilled pilot hole from 12,588 down. Open EDC, 9/1/2017 9/1/2017 0.90 PROD3 DRILL CIRC T Increase rate to 2.22 bpm, watch two 12,550.0 12,606.0 20:15 21:09 sweeps land on the shaker, solids greatly reduced on the second. Loaded another 5x5 sweep in the coil . and closed EDC 9/1/2017 9/1/2017 0.20 PRODS DRILL DLOG T Log Kl for+5.5'correction 12,606.0 12,628.0 21:09 21:21 9/1/2017 9/1/2017 0.20 PROD3 DRILL WPRT T RIH pumping sweeps. 12,628.0 13,700.0 21:21 21:33 9/1/2017 9/1/2017 0.60 PROD3 DRILL WPRT T Pu Wt 39 k lbs, PUH slowly timing out 13,700.0 12,550.0 21:33 22:21 sweeps. continue to POOH chasing sweeps to surface. Saw slight/brief motor work @ 12,780' just below the window, RBIH, PUH, clean. Park and open EDC. 9/1/2017 9/2/2017 1.65 PROD3 DRILL WPRT T Continue to POOH pumping 2.27 bpm 12,550.0 3,400.0 22:21 00:00 9/2/2017 9/2/2017 0.80 PROD3 DRILL WPRT T Continue to POOH pumping 2.27 bpm 3,400.0 83.0 00:00 00:48 9/2/2017 9/2/2017 1.30 PROD3 DRILL PULD T Tag up, space out, PJSM, PUD & LD 83.0 0.0 00:48 02:06 1 IBHA 925. 9/2/2017 9/2/2017 1.30 PROD3 STK PULD T PU & PD BHA # 26, anchored billet, 0.0 83.0 02:06 03:24 check pack offs - replace. Page 27151 ReportPrinted: 912712017 Operations Summary (with Timelog L)epths) 3M-27 .• Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log S han7nna End Time Or! (hr) Phase Op code Adiv'dy Code Time p -T -X Operation Sart Depth (n De End Depth (ahm) 9/2/2017 9/2/2017 2.45 PRODS STK TRIP T RIH 83.0 12,610.0 03:24 05:51 9/2/2017 9/2/2017 0.15 PRODS STK DLOG T Log the Kt correction plus 9 ft 12,610.0 12,624.0 05:51 06:00 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Continue RIH 12,624.0 13,374.0 06:00 06:15 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Small bobble @ 13,347', set down 3 13,374.0 13,374.0 06:15 06:30 times, setting down 4 k=DHWOB, PUW=48 k, 9/2/2017 9/2/2017 0.50 PRODS STK WAIT T Call Town Engineer, for plan forward. 13,374.0 13,498.0 06:30 07:00 decision was made to attempt to push past ledgeldebris in hole, set down 4.7 k, PUW=52, RBIH @ 40 fpm, popped thru, continue RIH' 912/2017 9/2/2017 1.00 PRODS STK TRIP T Continue RIH, set down 4.7 k, 13,498.0 13,498.0 07:00 08:00 PUW=52 k, try and work billet down 13 times, setting down 4-6 k, max PUW= 60 k (sticky), max set down weight 6.5 k DHWOB, AP=dropping to 3,342 psi, bring annular pressure back up to MP 4,058 psi with no success in getting past 13,498' 9/2/2017 9/2/2017 0.25 PRODS STK WPST T Call Town Engineer, plan forward set 13,498.0 13,475.0 08:00 08:15 Estimated TOB at 13,475', Anchor set @ 30 ROHS. Bring pump up to 4,241 psi, tool shifted showing 1.7 k DHWOB, set down additional 1.5 k, PUW=47 k 9/2/2017 9/2/2017 2.50 PRODS STK WPST T POOH, pumping 1.0 bpm at 2773 psi, 13,475.0 73.3 08:15 10:45 filling in trip sheet, PJSM @ 750' from surface 9/2/2017 9/2/2017 1.15 PRODS STK PULD T Tag up at surface, space out, PUD & 73.3 0.0 10:45 11:54 LD BOT Selling tools 9/2/2017 9/2/2017 1.25 PRODS STK PULD T. PD kickoff/drilling BHA# 27 0.0 78.3 11:54 13:09 9/2/2017 9/2/2017 0.50 PRODS STK SVRG P PJSM, w/crew and Hydra -Rig rep, 78.3 78.3 13:09 13:39 measuring goose neck A - frame..... When stabbed on to stump. 9/2/2017 9122017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH following 78.3 12,610.0 1339 15:39 MP schedule, filling trip sheet every 1000', test agitator at 308', (working) 9/2/2017 9/2/2017 0.25 PRODS STK DLOG T Log the K1 marker correction of plus 12,610.0 12,620.0- 15:39 15:54 4.5', PUW=40 k 9/2/2017 9/2/2017 0.35 PROD3 STK TRIP T Continue RIH, RIW=13 k 12,620.0 13,480.0 15:54 16:15 9/2/2017 9/2/2017 2.00 PRODS STK KOST T Dry tag TOB, bring pump up to 1.8 13,480.0 13,483.0 16:15 18:15 bpm at 5,238 psi FS, BHP 3,968, W HP 0, IA 0, OA 253 9/2/2017 9/2/2017 0.90 PRODS STK KOST T 1.80 bpm, targeting 0.5-1k WOB, 13,483.0 13,495.0 18:15 19:09 @ 13,483' ROP 3 ft/hr, WOB -.66k lbs @ 13,485' increased ROP to 5.5 ft/hr - WOB 0.8 k Itis @ 13,486 increased ROP to 12 fUhr- WOB 0.3 k lbs @13,487' chasing it, 15 ft/min, WOB 1 k lbs Page 28/51 Report Printed: 9127120171 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tithe Log Depth start Time Ed Time oursten and Phase Op Cotla Asti y Code Time P -T -X Ope a on ad tl Oep h fl a) 9/2/2017 9/2/2017 0.40 PROD3 STK TRIP T Drilling ahead, 130-30 ft/hr, lost depth 13,495.0 13,508.0 19:09 19:33 tracking. •. Note WOB started falling off at 19:19 right when the depth Counter spears to have failed. 9/2/2017 9/2/2017 1.10 PROD3 STK TRIP T PU 38k lbs, mechanical @ 13,444', 13,506.0 12,734.0 19:33 20:39 jog slowly in 10 foot interval. Effect repair and pull slowly up hole, reduce pump rate "best guess' where we think TOB is. Bring rale back up continue up hole logging to RA tag. See pip tag on the drive by 9/2/2017 9/2/2017 0.20 PRODS STK DLOG T RBIH log RA lag for +7' correction 12,734.0 12,753.0 20:39 20:51 9/2/2017 9/2/2017 0.20 PRODS STK TRIP T RIH, 12,753.0 13,497.0 20:51 21:03 9/2/2017 9/2/2017 0.40 PRODS STK DLOG T SID @ 13,497, PU, RBIH, bounce 13,497.0 13,598.0 21:03 21:27 through. Continue to RIH logging from 13,508 down. Drive past suspect bottom, park at 13,532' survey- suspect in original hole. reduce pumps to min rate attempt to tag bottom. Survey @ 13,564'same results, in old hole Tum around at 13,598' 9/2/2017 9/2/2017 1.20 PRODS STK WPRT T Pump 5x5 sweep, PU, POOH toward 13,598.0 12,544.0 21:27 22:39 the window wiping hole. Pump another 5x5 sweep Make 2 up down passes, LS on up, HS on down from 13,430 - 13,300' in attempt to clean up the previous trouble spot. Continue to POOH. 9/2/2017 9/3/2017 1.35 PRODS STK WPRT T Open EDC, POOH pumping 2.2 bpm 12,544.0 4,693.0 22:39 00:00 chasing sweeps. 9/3/2017 9/3/2017 1.30 PROD3 STK WPRT T Continue to POOH. Packed off the 4,693.0 78.0 00:00 01:18 MM while tripping, bypass same and contiue out of hole. Jog near surface. 9/3/2017 9/3/2017 1.50 PRODS STK PULD T Bump up, space out, PUD, 78.0 0.0 01:18 02:48 ***Bit had 7 of 10 total side ( reaming ) Cutters severely damaged -Bit graded 1-7 9/3/2017 9/3/2017 1.50 PROD3 STK PULD T PU and PD BHA # 28, Aluminum billet 0.0 73.0 02:48 04:18 w open hole anchors, bump up, set counters, pumps on at min rate, 9/3/2017 9/3/2017 2.50 PRODS STK TRIP T RIH, close EDC, centiue to RIH 73.0 12,610.0 04:18 06:48 9/3/2017 9/3/2017 0.20 PROD3 STK DLOG T Tie into K1 for plus 4.0' Correction, 12,610.0 12,632.0 06:48 07:00 PUW 42 k 9132017 9/3/2017 0.50 PRODS STK TRIP T Continue IH -. 12,632.0 13,426.0 07:00 07:30 9/3/2017 9/3/2017 0.25 PROD3 STK WPST T At depth, PUW=43 k, RBIH to 13,426.0 13,415.0 07:30 07:45 13426.8' PUH 39 k, bring pump online 0.45 bpm, tool sheared at 4,800 psi, 9/3/2017 9/3/2017 2.15 PROD3 STK TRIP T POOH, PJSM @ 750' from surface 13,415.0 61.2 07:45 09:54 Page 29151 ReportPrinted: 9/27/2017 . Operations Summary (with Timelog L)epths) Milli 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Nene EM Time Dur (hr) Phase op Code Ac" Code rime P-T-x Operation ft De S7eM1 Depth EM Dept"WB) 9/3/2017 9/3/2017 0.80 PRODS STK PULD T PUD BOT setting tools 61.2 0.0 09:54 10:42 9/3/2017 9/3/2017 0.25 PRODS STK PULD T LD BOT tools 0.0 0.0 10:42 10:57 9/3/2017 9/3/2017 1.00 PROD3 STK PULD T PU/MU AL2 kickoff/drilling BHA, 0.0 78.3 10:57 11:57 surface test tools (good-test) 9/3/2017 9/3/2017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH w/AL2 78.3 12,610.0 11:57 13:57 kickoff/driliing BHA# 29 9/3/2017 9/3/2017 0.15 PRODS STK DLOG T Log K1 marker correction of plus 4.0' 12,610.0 12,716.0 13:57 14:06 9/3/2017 9/3/2017 0.50 PRODS STK TRIP T Continue IH 12,716.0 13,415.0 14:06 14:36 9/3/2017 9/3/2017 2.00 PR003 STK KOST T Dry tag TOB, PUW 40 k, bring pump 13,415.0 13,425.0 14:36 16:36 on-line 1.8 bpm at 5,124 psi, BHP 3,934, WHP 0, IA 0, OA 275, CTSW=11.3 k, DHWOB=0.15 k, Kickoff Billet as per RP, 20°ROHS 9/3/2017 9/3/2017 2.00 PRODS DRILL DRLG T Start drilling formation 1.8 bpm at 13,425.0 13,750.0 16:36 18:36 5,719 psi, BHP 3,932, WHP 0, IA 0, OA 386, CTSW=8 k, DHWOB=1.6 k, ROP 67 fph Stalled, PU and dry drifted billet clean PU @ 13,537'to get restarted, 43 K lbs BOBD 130-155 ft/hr, Pump 5x5 @ 13,672' drilling @ 150 ft/hr, Ct Wt Ok lbs, 1.73 k lbs Sweeps start exiting the nozzle @ 13,746', staged a 10 bbl Hi vis sweep in the coil to time out below the window. 9/3/2017 9/3/2017 1.70 PRODS DRILL WPRT T Pu, Wt 44 klbs 13,750.0 13,360.0 18:36 20:18 PUH chasing sweeps. Pull 50 k Ibs @ 13,460, tum around, S/D, PU, pump min rate, RBIH, SID, PU, RBIH Bounce through, continue in hole 13,650, PU Wt, 44 k PUH @ 30 it/min pumping 1.8 bpm, sweeps exit at 13,480'. Small neg WOB @ 13460'. tum around 13,438' RBIH @ 1.0 bpm. saw a little WOB spike at 13,4683, other than that clean PU 43k, PUH, saw a little neg WOB again @ 13,460' Pulled past billet, 44 k clean, saw 48 k CT wt as we drug by with a -1 k WOB spike. 9/3/2017 9/3/2017 2.50 PRODS DRILL TRIP T Continue to POOH. 13,360.0 74.0 20:18 22:48 Open EDC above TOC, increase pump rate from 1.8 to 2.2 bpm - Continue to POOH 9/3/2017 9/4/2017 1.20 PRODS DRILL PULD T Bump up, space out, PUD BHA#29, 74.0 0.0 22:48 00:00 UDsame 9/4/2017 9/4/2017 0.40 PRODS DRILL PULD T Continue to lay down BHA #29 0.0 0.0 00:00 00:24 Page 30151 Report Printed: 912712017 . Operations Summary (with Timelog Oepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Time End Time Our(hr) Phase op Code Activity Com Time PJA Operation start Depm MKB) Ertl Depm Mat 9/4/2017 9/4/2017 3.60 PRODS DRILL RURD P Prep to test BOPS 0.0 0.0 00:24 04:00 PU nozzle, stab injector, jet stack, (rolling coil to fresh water while jetting stack). Un Stab injector, central shops grease tree valves, Nabors crew grease stack. and/choke valves, Test inner reel iron low / high good. install night cap, 9/4/2017 9/4/2017 2.00 PRODS WHDBOP BOPE P PJSM, Flood up BOP stack, Start test 0.0 0.0 04:00 06:00 @ ( 4:00 ) Witness of lest by AOGCC - Bob Nobel. 250 psi low / 4200 psi High. test #1 Swab 2, - pass Test #2 Lower Blind shear, TV2 - pass Test #3 BOP TV1 - Test #4 Upper blind shear, B1,&5 C4,5,8,&12, R1, bleeder 1 Test #5 C3,6,7,&11,62&6, T2 9/4/2017 9/4/2017 8.00 PRODS WHDBOP BOPE P Crew change, PJSM, contiue BOP 0.0 0.0 06:00 14:00 testing, sim-ops - replace coupler on motor#1, right angle drive motors on INJH, - BOP test Complete 14:00 (10 his TT), 2 faillpass, R3 grease and function (retest good) and Koomey # 1 - accumulator pump failed, changed out contactor, (retest good) 9/4/2017 9/4/2017 0.65 PRODS DRILL DISP P Stab INJH onto stump, circulate coil to 0.0 0.0 14:00 14:39 drilling fluid.Unstab INJH, move cart back 9/4/2017 9/4/2017 1.75 PRODS DRILL PULD T PU/PD pre -loaded BHA# 30 0.0 78.3 14:39 16:24 9/4/2017 9/4/2017 0.25 PRODS DRILL PULD T Stab INJH, surface test Coiltrak tools 78.3 78.3 16:24 16:39 (good -test), tag up, zero counters 9/4/2017 9/4/2017 2.00 PRODS DRILL TRIP T RIH, w/ AL2 drilling BHA# 30 78.3 12,595.0 16:39 18:39 w/agitator and RR bi-center bit 9/4/2017 9/4/2017 0.15 PRODS DRILL DLOG T Log the K1 marker correction of plus 12,595.0 12,632.0 18:39 18:48 8.5' 9/4/2017 9/4/2017 0.25 PRODS DRILL TRIP T Continue IH 12,632.0 13,750.0 18:48 19:03 914/2017 9/4/2017 1.50 PRODS DRILL DRLG T OBD, 1.8 bpm at 4,875 psi FS, BHP 13,750.0 13,862.0 19:03 20:33 3,996, WHP 0, IA 0, OA 364, CTSW=9 k, DHWOB=1.7 k, ROP 69 fph 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T BHA wiper, PUW 44 k 13,862.0 13,862.0 20:33 20:42 9/4/2017 9/4/2017 2.00 PRODS DRILL DRLG T BOBD, 1.75 bpm at 4,888 psi FS, 13,862.0 13,976.0 20:42 22:42 BHP 9,994, WHP 0, IA 0, OA 365, CTSW=1.5 k, DHWOB=1.4 k, ROP 50 -69 fph, pump 5x5 sweep 9/4/2017 9/4/2017 0.25 PRODS DRILL WPRT T Sweep at bit, wiper up hole, PUW 44 k 13,976.0 13,750.0 22:42 22:57 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T Wiper back IH, RIW 10 k 13,750.0 13,976.0 22:57 23:06 9/4/2017 9/5/2017 0.90 PRODS DRILL DRLG T BOBD, 1.75 bpm at 4,797 psi FS, 13,976.0 14,053.0 23:06 00:00 BHP 3,996, WHIP 0, IA 0. OA 371, CTSW=minus 2k, DHWOB=1.7 k, ROP=50 fph Page 31151 Report Printed: 9127/2017 . Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log StartTme End Tre y Diffthn Phase Op Code Activity Code Time P-T-X Opeahon Start Depth prime End Depth (ftxa) 9/5/2017 9/5/2017 1.40 PRODS DRILL DRLG T OBD 1.75 bpm Ct 5000 psi, BHP 14,053.0 14,150.0 00:00 01:24 3,996, WHP 0, IA O. OA 402, CT Wt -3 k lbs, WOB 1 k IbsROP 70 fUhr BHA wiper at 14,072'- PU 43 K lbs BHA wiper at 14,091'- PU 45 K lbs - sent 5x5 low/hi sweep average ROP over interval drilled 70 R/hr 9/5/2017 9/5/2017 0.40 PROD3 DRILL WPRT T Wiper#2, 700'after sweeps exit the 14,150.0 13,450.0 01:24 01:48 bit - PU Wt 40k Itis 9/5/2017 9/5/2017 0.40 PRODS DRILL WPRT T RBIH, Tight spot @ 13,850' 13,450.0 14,150.0 01:48 02:12 Swap from mud pump #2 to #1 to repair a packing leak 9/5/2017 9/5/2017 1.80 PRODS DRILL DRLG T 1.77 bpm, off bottom CT 4795 psi, diff 14,150.0 14,270.0 02:12, 04:00 944 psi, Ct RIH Wt 10 k Itis OBD, Ct wt, 8 k lbs, WOB 1.5 k lbs, ROP 70 ft/ hr Drilled into something hard -14,165'3 K WOB, ROP 30 R/hr PU & restart @ 14,165', 42 k Itis Broke through @ 14,170'- ROP 170 N hr WOB 1.5-2 k - short lived, settled In at 100 R/hr @ 14,199'diff fell off, PU 46 k lbs - RBIH, send 5x5 BHA wiper 100'@ 14,249' PU 43 k lbs BOBD up to 130 R/hr w neutral coil weight and 600 lbs WOB Average ROP 67 fUhr Losses crept up to - 0.1 bpm 9/5/2017 9/5/2017 2.50 PROD3 DRILL DRLG P OBD, Ct wt, 2.5 k lbs, WOB 1 k Itis, 14,270.0 14,432.0 04:00 06:30 ROP 70 ft/ hr PU and restart @ 14,333' PU Wt 43k PU and restart @ 14,35' PU Wt 47k - pump 5x5 Average ROP 65 R/hr 9/5/2017 9/5/2017 2.20 PRODS DRILL DRLG P OBD, Ct wt, -5 k lbs, WOB 1.0 - 0.5 k 14,432.0 14,543.0 06:30 08:42 Ibs, ROP 120 - 30 R/ hr on something hard, 14,511' pump 5x5 in anticipation of a wiper trip Averag ROP 50 ft/hr 9/5/2017 9/5/2017 0.80 PRODS DRILL WPRT P Wiper #3 after sweeps exit the bit --*PU 14,543.0 12,610.0 08:42 09:30 Wt 43k lbs - 1933' Saw some motor work below the window @ 12,880' 9/5/2017 9/52017 0.10 PRODS DRILL DLOG P RBIH, tie into K1 for +3.5'correction 12,610.0 12,633.0 09:30 09:36 9/5/2017 9/5/2017 0.80 PRODS DRILL WPRT P 12,633.0 14,543.0 09:36 10:24 JRBIH WOB bobble @ 13,867', S/D @ 13,914' bounced through Page 32151 ReportPrinted: 9/2712017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Thhhe Log Sled Tme End Time Dur hr ( ) Phase O Code P Activ Code M Time P-T- % Operation Sial Depth (ftKB) End Depth (ftl®) 9/5/2017 915/2017 4.00 PROD3 DRILL DRLG P 1.83 bpm, Ct 5140 psi, diff 980 psi 14,543.0 14,649.0 10:24 14:24 RIH Wt 4 k Ibs OBD, CtWt 3.5 it Ibs, WOB 1.1 it, ROP 55 ft(hr PU Wt43 k lbs, Swap from Pump #1 to #2 RBIH CT Wt -5 it lbs, WOB 1.36 it lbs, ROP 43 ft/hr PU to get restarted @ 14,649', 45 k lbs not much change, pump 5x5 PU as sweep exited the nozzle, PU wt 43k, 9/5/2017 9/5/2017 1.80 PRODS DRILL DRLG P 1.70 bpm, free spin diff 855 psi 14,649.0 14,722.0 14:24 16:12 OBD, CtWt 4 to -5 k lbs, WOB 1 to 0.5 k, ROP 10 - 30 ff/hr Send sweeps, poor ROP and weight transfer PU to restart @ 14,707', Pu Wt 46k 50 ff/hr while pill exiting then death spiral, PU Wt 50 klbs. 9/5/2017 9/5/2017 0.20 PRODS DRILL WPRT P PU Wt, 47 k lbs - 300'short wiper 14,722.0 14,503.0 16:12 16:24 RBIH 9/5/2017 9/5/2017 0.60 PROD3 DRILL WPRT P 1.70 bpm, Ct 4801 psi, free spin diff 14,503.0 14,722.0 16:24 17:00 860 psi, RIH Wt 3.3k BOBD, CtWt 5 k lbs, WOB 1 k, ROP 35 it/hr, send 10 bbl beaded pill 9/5/2017 9/5/2017 2.50 PRODS DRILL DRLG P Continue drilling ahead from 14,722', 14,722.0 14,795.0 17:00 19:30 performing BHA wipers as required, begin climbing to planned 94` inclination to regain sand at 14745' (as per geology) 9/5/2017 9/5/2017 3.50 PRODS DRILL DRLG P OBD at 14,795', CWT=-5K-2K, 14,795.0 14,876.0 19:30 23:00 WOB =1K,.1 bbl/min losses, pumping beaded pills as required, increase NBI to 96°, multiple BHA wipers to keep going, PUW from 14,843'= 52K (averaging - 42K - 44K). Began sending 5x5 sweeps from 14,862' in prep for WT & mud swap after exiting lower At Silt, average ROP over interval = 23 fph . 9/5/2017 9/5/2017 0.50 PRODS DRILL WPRT P Wiper up-hole, PUW = 45K 14,876.0 13,450.0 23:00 23:30 9/5/2017 9/6/2017 0.50 PROD3 DRILL WPRT P Wiper in-hole, clean past 13,450.0 14,200.0 23:30 00:00 13,830' (Fault #1), three 2.5K set downs at -13,869'& -13,650', PUW = 42K, reduce rate to .2 bpm & get by, set down at 13,899', again reduce to min rate & get by, RIW at 14,190'= 9.4K 9/6/2017 9/6/2017 0.20 PRODS DRILL WPRT P Continue WT in-hole 14,200.0 14,876.0 00:00 00:12 9/6/2017 9/6/2017 2.80 PRODS DRILL DRLG P BOBD, FS=930 psi, CWT =1K, 14,876.0 14,933.0 00:12 03:00 WOB = 1 K, circ pressure = 5413 psi, rate in = 1.7 bpm, began pumping new mud (System #5), new mud at the bit at 14,906', PUW = 50K from 14,907', increase rate to 1.8 bpm, experience significant vibrations, reduce rate back down to 1.7 bmp Page 33151 Report Printed: 912712017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End retia Dta(Ir) Phase OpcMe Actiuiry Code Time P -T -X Opamlion (flKe) Ertl nepplh.WB) 9/6/2017 9/6/2017 3.00 PRODS DRILL DRLG P Continue drilling from 14,933', rate in 14,933.0 15,018.0 03:00 06:00 = 1.7 bpm, FS = 950 psi, CWT = 5K, WOB = 1 K, continue snubbing coil, PUW = 48K from 14,941', attempt 1.5 bpm, continue to struggle with weight transfer, bring rate back up to 1.7 bpm, begin to lube up pill pit to 2% 776 (50 bbl). - 9/6/2017 9/6/2017 4.20 PRODS DRILL DRLG P OBD, pumped 20 bbls 2% lube pill. 15,018.0 15,118.0 06:00 10:12 Pre, coming of a BHA wiper, 1.83 bpm, CT 5135 psi, diff 990 psi, Ct Wt -2k, - WOB 0.8 k ROP 27 ft/hr Post, all 20 bbls lube pill out Ct Wt -6, WOB 0.5 k , had to pick up. - little effect, built and pumped a 20 bbl 2% low torque sweep from active mud. WOB up to 2.8 k lbs with neg CT wt, first time we've broke 1 k WOB all morning, lube up active system to 2% low torque. 23 fU hr average 9/6/2017 9/6/2017 0.50 PRODS DRILL DRLG P Drilling break, ROB up to 110 Whir 15,118.0 15,150.0 10:12 10:42 PU's dropped to 43 k Itis, able to easily turn around Weight transfer gradually deteriorated at 140 bbls away of the 20 bbl pill ROP averaged 64 ft/hr 9/6/2017 9/6/2017 0.40 PRODS DRILL WPRT P Wiper #2 PU W151 k - 1,450' 15,150.0 13,700.0 10:42 11:06 14,357'to 14,200'a little motor work 13,863' motor work, -1.4 k WOB, pulled —50 k , 10 k over clean string weight 9/6/2017 9/6/2017 0.50 PRODS DRILL WPRT P Wiper RBIH 13,700.0 15,150.0 11:06 11:36 13,860' WOB spike 13,875' S/D 3.3 k, PILL RBIH min rate slid through - Stack weight 13,906 to 13,968 while RIH @ min rate 9/6/2017 9/6/2017 5AD PRODS DRILL DRLG P BOBD, struggled to get to bottom, had 15,150.0 15,300.0 11:36 17:00 to reduce pumped rate and ramp up to drilling rate once on bottom. CT Wt -6k lbs, WOB 0.5 k ROP 20-70 Whir Struggling with weight transfer, build another 2% low torque pill, pump 20 bbls No change in weight transfer. Add beads to pill, pump with little benefit. Build 2 ppb beaded pills w active mud and pump as sweeps - 10 tills each. little benefit. 9/6/2017 9/6/2017 4.00 PRODS DRILL DRLG P OBD, trouble turning around below 15,300.0 15,376.0 17:00 21:00 15,110' Ct wt 0 to -8 k Its, WOB, 0.3 to 1 k lbs, ROP 15 -40 ft/hr. Pumping 10 bbl beaded pills as needed with little effect Page 34151 Report Printed: 912 712 01 7 Operations Summary (with Timelog uepths) AN." 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Terse EM Tme D, (hr) Phase Op Cade Activity Code Time P -T -x Operation (like) EM Oeplh(tuta) 9/6/2017 9/7/2017 3.00 PRODS DRILL DRLG P Continue drilling from 15,376', CWT = 15,376.0 15,407.0 21:00 00:00 -5K, WOB -.9K, rate in = 1.7 bpm, experiencing low ROP - 10-20 fph; samples from 15,386' showing signs of clay, rig geo sent logs and centered with town geology,decision made to increase inclination to 96° and - continue drilling ahead, looking for top of C4, gamma wrapping with bit depth of 15,436' 9/7/2017 9/7/2017 3.50 PRODS DRILL DRLG P Continue drilling ahead as per 15,407.0 15,440.0 00:00 03:30 geology, climbing to 96° inclination, CWT = -5K, WOB = 1.5K, rate = 1.7 bpm, observed short ROP breakouts up to 115 fph, gamma begins to wrap at 15,405' (gamma tool depth) 9/7/2017 9/7/2017 0.40 PRODS DRILL DRLG P Contiue drilling ahead at 15,440', CWT 15,440.0 15,443.0 03:30 03:54 -4K, WOB = 1.8K, drilling through 150+ API formation, TD called at 15,433', PUW = 47K 9/7/2017 9/7/2017 4.00 PRODS DRILL WPRT P Pump sweeps, circulate down coil, lay 15,443.0 83.0 03:54 07:54 -in beaded pill as per town request (50 bbl), perfrom swab WT. Saw a little motor work, - 1 k WOB and - 4k overpull on CT @ 13,844 9/7/2017 9/7/2017 1.70 PRODS DRILL WPRT P RBIH to confirm formation pressure, 83.0 12,610.0 07:54 09:36 TD, and flags 9/7/2017 9!7/2017 0.30 PRODS DRILL DLOG P Tie in, drive by, PU 40 k lbs, RBIH, Tie 12,610.0 12,631.0 09:36 09:54 into Kt for+15' correction, Park at 12631.24 bit depth, Sensor depth 6114 TVD. Trap 3852 psi, watch it fall to 3715 psi ( baker annular pressure) calculated to 11.68 ppg and trending down. 9/7/2017 9/7/2017 0.50 PRODS DRILL WPRT P RBIH to confine formation pressure, 12,631.0 13,903.0 09:54 10:24 TD, and flags set down 9/7/2017 9/7/2017 0.30 PRODS DRILL WPRT P PU and RBIH pumping min weight, 13,903.0 13,507.0 10:24 10:42 Work pipe to 14,100', PUH, pulling heavy, work pipe, squating and pulling out of hole at 75 ff/min, pulled up to 74k came free. pull up hole above the fault. CT weight 39 k lbs above the fault. 9/7/2017 9/7/2017 0.20 PRODS DRILL WPRT P RBIH, counter failed, did not notice for 13,507.0 13,661.0 10:42 10:54 3 minutes. 9/7/2017 917/2017 0.70 PRODS DRILL CLOG T Turn around, PU Wt 42 k PUH. 13,661.0 12,540.0 10:54 11:36 9/7/2017 9/7/2017 0.20 PRODS DRILL SVRG T Park and replace counter 12,540.0 12,540.0 11:36 11:48 9/7/2017 9/7/2017 0.20 PROD3 DRILL DLOG T RBIH, tie into K1 + 13' 12,540.0 12,629.0 11:48 12:00 9/7/2017 9/7/2017 0.30 PRODS DRILL WPRT T Continue to RIH, drop rate prior to 12,629.0 13,661.0 12:00 12:18 1 crossing billets and left it at 0.4 bpm. 9/7/2017 9/7/2017 0.60 PRODS DRILL WPRT P Continue to RIH, we 2 WOB bobble 13,661.0 15,406.0 12:18 12:54 at 13,837 and 14,00'. Increase pump rate to 1.2 below trouble area 13,400. Stack coil weight @ 14,779' reduce rate to 0.7 bpm, contiune on in hole. Set down in hot gamma area, stack 2.25K WOB Page 36151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time EM Terse Dur(hr) Phase Op Code Activity CMe Time P4 -X OpereGon Start Depth (WB) End Depth (itl(a) 9/7/2017 9/7/2017 3.60 FROM DRILL WPRT P PU, 49 k lbs 15,406.0 100.0 12:54 16:30 Pump beaded liner running pill start PUH after letting - 6 bbls out the bit Paint Yellow EOP flag Q 14178.2 in tension Chase liner running pill w KW Pull through fault area, neg WOB spikes from 13,875-13,833'. Paint White window flag oQ 10976.12' continue to POOH. 9/7/2017 9/7/2017 1.50 PRODS DRILL PULD P At surface flow check - good, PJSM, 100.0 0.0 16:30 18:00 LD BHA #30. 9/7/2017 9/7/2017 2.40 COMPZ3 CASING PUTB P PJSM, PU AL2 Liner Run #1, (non- 0.0 1,653.0 18:00 20:24 ported bullnose, 31' pup, 4 jnts slotted liner, 2 tracer pups, 36 jnts slotted, & shorty deployment sleeve) 917/2017 9/712017 0.60 COMPZ3 CASING PULD P PU BHA#31, AL2 Liner Running 1,653.0 1,697.0 20:24 21:00 Tools (CoilTrack), slide in cart, stab on coil, bump up, set counters 9!7/2017 9/8/2017 3.00 COMPZ3 CASING RUNL P RIH with AL2 Liner Run #1, PUW = 1,697.0 13,844.0 21:00 00:00 42K at window, tie into window flag for +15' correction Stack weight at 13,600'- 13,844', work pipe, PUW's = 45K -50K, up to negativelOK WOB. 9/8/2017 9/812017 3.00 COMPZ3 CASING RUNL P Continue RIH with AL2 Liner Run #1, 13,844.0 .74,400.0 00:00 03:00 stack weight from 13,844' through14,115', PUW's 45K -48K, working liner at various speed, significant time working past 14,124'& 14,345' (top of crest past Fault #1), 9/8/2017 9/8/2017 1.50 COMPZ3 CASING RUNL P Continue working AL2 liner Run #1 14,400.0 15,410.0 03:00 04:30 towards bottom, stacking reduced sigficantly froml4,530', experience difficulty working liner past 15,073', park, circulate at .25 bpm, attempt again & get by, arrive at setting depth (bottom at 15,410'), bring up rate to 1.7 bpm, release off liner. 9/8/2017 9/812017 3.00 COMPZ3 CASING TRIP P POOH, paint EOP flags 15,410.0 71.0 04:30 07:30 13,314' (yellow), & 13,270' (white), tie into K1 for+5' correction 9/8/2017 9/8/2017 0.50 COMPZ3 CASING PULD P At surface, PJSM, flow check - good, 71.0 0.0 07:30 08:00 LD liner running asembly over a dead well, inspected pipe --20' good. 9/8/2017 9/8/2017 1.50 COMPZ3 CASING PUTB P Prep floor for running liner, PU and 0.0 400.0 08:00 09:30 run 10 R3 joints 2-3/8" 4.6# L-80 slotted liner topped W two pups, 16.15' and an aluminum billet W - openhole anchors, ported bullnoseon bottom, " upper AL2 liner length - 428.58 9/8/2017 9/8/2017 0.70 COMPZ3 CASING PULD P PU I MU BHA #32 over a dead well, 400.0 489.8 09:30 10:12 tag up, set counters, open EDC, 9/8/2017 9/8/2017 2.90 COMPZ3 CASING RUNL P RIH, 400.0 12,589.8 10:12 13:06 Tie in to window flag for + 15.4' correction. Page 36151 Report Printed: 9/2712017 -, Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Simi Tim S End Time Dur Qv) Phase OP Cotle Aclh*Code Time P -T -X Operation D. SSI DePN End Depth (flKa) 9/8/2017 9/8/2017 1.00 COMPZ3 CASING RUNL P Down on pumps, Close EDC, PU Wt 12,589.8 13,759.0 13:06 14:06 42.5 k lbs continue to RIH Tie into Kt for+6.5' correction Trip to bottom at 35 ft/min with 14k Ct Wt, 0 WOB S/D @ 13,759', WOB 3.38 k PU Wt 42 RBIH, SID Q 13,759', 3.3K WOB, PU 35 k to slack weight, WOB 1.6 k, slip oriented 180 *ROHS. Online with the pumps, sheared - 4500 psi. PU Wt 40k, WOB 0 k lbs 9/8/2017 9/8/2017 2.30 COMM CASING TRIP P Park, reset counters, -POOH 13,759.0 70.0 14:06 16:24 9/8/2017 9/8/2017 1.00 COMPZ3 CASING PULD P At surface, flow check - Good, PJSM, 13,759.0 70.0 16:24 17:24 LD BHA #32. 9/8/2017 9/8/2017 0.80 PROD4 DRILL BOPE P Weekly BOP function test, good 0.0 0.0 17:24 18:12 9/812017 9/8/2017 1.10 PROD4 STK PULD P PJSM, PU BHA#33, AL2 -1 lateral 0.0 78.0 18:12 19:18 drilling assembly (0 hr agitator, 0.5° AKO X-Treme motor, RB Hughes bit), slide in cart, stab on coil, check pack - offs, good, check BHI counter, tag up, set counters, open EDC 9/8/2017 9/8/2017 2.40 PROD4 STK TRIP P Begin RIH with BHA #33, close EDC 78.0 12,605.0 19:18 21:42 at 500', bring up rate, surface test agitator, good 9/8/2017 9/8/2017 0.30 PROD4 STK DLOG P Tie into Kt to +18' correction, park, 12,605.0 12,649.0 21:42 22:00 open EDC 9/8/2017 9/8/2017 1.50 PROD4 STK DISP P Circulate hole to drilling fluid, observe 12,649.0 12,669.0 22:00 23:30 significant cuttings coming over shakers, observe small "plastic' looking material/shavings mixed with cuttings R beads, shut down pumps, close choke, Gose EDC 9/8/2017 9/8/2017 0.30 PROD4 STK TRIP P Continue RIH, tag TOB at 13,327', 12,669.0 13,327.0 23:30 23:48 PUW = 42K 9/8/2017 9/9/2017 0.20 PROD4 STK KOST P Bring rate up to 1.8 bpm, FS = 812 13,327.0 13,327.0 23:48 00:00 psi, begin kicking off billet at 150° ROHS, CWT = 14K, WOB =.7K, annular = 3900 psi, WHIP = 0 psi, circ pressue = 4938 psi, 9/9/2017 9/9/2017 2.20 PR004 STK KOST P Continue to KO billet at 13,227', FS = 13,327.0 13,337.0 00:00 02:12 860 psi, CWT = 14.3K, WOB =.55K, annular = 3907 psi, WHP = 0 psi, aluminum over shakers 9/9/2017 9/9/2017 1.80 PROD4 DRILL DRLG P Off billet w/o issue, drilling in 13,337.0 .13,500.0 02:12 04:00 formation, CWT = 1 OK, WOB = 1.5K, rate in = 1.8 bpm, annular = 3893 psi, dry drift billet up 8 down, clean WOB spike at 13,426' of 3852 psi, PU, FS down by -50 psi, bore pressure down by - 70 psi of bottom, continue drilling ahead watching parameters, similar event occured at 13,485' Page 37151 Report Printed: 9/27/2017 Operations Summary (with Timelog IJepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time End Tare Dur (hr) Phase Op Cade Activity Cade Time P -T -X Operation (Po®) End Depth(fiKa) 9/9/2017 9/9/2017 0.50 PROD4 DRILL DRLG P PUW = 50 K, BHA wiper, losses 13,500.0 13,538.0 04:00 04:30 began at 13,494', losing —.37 bpm, continue drilling, FS =850 psi, CWT = 9K, WOB = .43K, rate in= 1.76 bmp, rate out = 1.58 bpm, losses appear to be healing with continued drilling, experience difficulty obtaining survey 9/9/2017 9/9/2017 0.50 PROD4 DRILL WPRT T Difficulty obtaining a clean survey, 13,538.0 13,538.0 04:30 05:00 PUH in attempt to get survey as per DD, no luck, RBIH to continue drilling in attempt to obtain dean survey. 9/9/2017 9/9/2017 1.00 PROD4 DRILL DRLG P BOBD, FS = 829 psi, obtained clean 13,538.0 13,600.0 05:00 06:00 survey at 13,513', CWT = 8K, WOB 2.6K, 9/9/2017 9/9/2017 0.20 PROD4 DRILL WPRT T PU, in attempt to re log missed 13,600.0 13,473.0 06:00 06:12 surveys 9/9/2017 9/9/2017 0.60 PROD4 DRILL WPRT T RBIH , attempt to pick up missed 13,473.0 13,600.0 06:12 06:48 surveys. caught enough to continue drilling with in parameters. 9/9/2017 9/9/2017 2.30 PROD4 DRILL DRLG P Attempted to vary pump rate to clean 13,600.0 13,771.0 06:48 09:06 up surveys, no vibrations, not pump related. Appears to be interference from the AL2 liner that we just set. Ct RIHWt 10 k lbs, 1.76 bpm in/1.68 bpm out, CT 4747 psi, free spin 770 psi. OBD, WOB 1.5 to 2.5 k Itis, ROP 30- 220 ft/hr, ROPs increased — 13650 Send 5x5 sweep to time out for wiper Average over interval 74 ft/hr 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT T Wiper trip #1, PU 48 k lbs, PU after 13,771.0 13,350.0 09:06 09:24 5x5 exiled the bit, PUH atempting to relog the misses surveys. No sucess. 9/9/2017 9/9/2017 0.40 PROD4 DRILL WPRT T RBIH 13,350.0 13,771.0 09:24 09:48 9/9/2017 9/9/2017 0.50 PROD4 DRILL DRLG P Ct RIHWt 10 k Ibs,1.75 bpm in 11.67 13,771.0 13,827.0 09:48 10:18 bpm out, Ct 4840 psi, diff 807 psi, OBD, CT Wt 7 k lbs, WOB 2 k lbs, ROP 100 f 1hr 9/9/2017 9/9/2017 5.20 PROD4 DRILL DRLG P Stack 3.46 k WOB @ 13,827'- no 13,827.0 14,020.0 10:18 15:30 motor work PU, 50 k attempt to restart, high weight on bit, low diff. PU and try again, 47 k PU Wt, same results PU 49 k, 100' BHA wiper, RBIH Got a bite, making hole, lost Ct Wt Ct Wt 2.5 k, WOB 2 k Its, ROP initially 100 ft/hr then tapered off rapidly to 50 then 30 Whir, Inc fell from 93 to 89° while drilling ahead. Got the call @ 12:50 - 13,934' to tum straight up. Having a hard time building angle. Weight transfer diminishing. Page 38151 Report Printed: 9127/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Shit Time End Time our (Mj Phase op Cetle ACAviry Code Time P -T -X Operation Sbrloepth (flKB) End Depth (RM) 9/9/2017 9/9/2017 0.30 PROD4 DRILL DRLG P PU and reduce rate to try and build 14,020.0 14,030.0 15:30 15:48 more angle. 1.53 bpm in/1.44 bpm out, CT 4288 psi, Diff 682 psi, Trying to target 2.5 k to 3 k WOB Ct wt -5 k lbs, WOB 1.99 k 9/9/2017 9/9/2017 1.00 PROD4 DRILL WPRT P Pump 5 x5 sweep PU Wt 42 k lbs, 14,030.0 12,752.0 15:46 16:48 PUH while sweeps travel to bit, pull to 13,855' Saw neg WOB spike @ 13,865' RBIH timing sweeps to exit near bottom, RIH Wt 10 k lbs PUH chasing sweeps on wiper trip through the build, saw motor work 12,880' 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT P RBIH 12,752.0 14,030.0 16:48 17:06 9/9/2017 9/9/2017 1.40 PROD4 DRILL DRLG P Try reduced rate and increased WOB 14,030.0 14,065.0 17:06 18:30 to build angle, confered with town, decison made to POOH and PU higher bend motor and new bit, pump sweeps 9/9/2017 9/9/2017 3.50 PROD4 DRILL TRIP T POOH, PUW = 45K, observe a bit of 14,065.0 78.0 18:30 22:00 motor work at -12,892' in build, park at 12,574', shut down pumps, close choke, open EDC, continue POOH, Gose EDC, surface test agitator, good, lag up, space out (PJSM) 9/9/2017 9/9/2017 1.80 PROD4 DRILL PULD T PUD BHA #33, checks not holding, 76.0 0.0 22:00 23:46 gather crew, quickly talk through PUD check list contingency for checks not holding, complete PUD, Hughes bit came out a 3-1 9/9/2017 9/10/2017 0.20 PROD4 DRILL PULD T Reconfigure BHA, PJSM, begin PD 0.0 0.0 23:48 00:00 BHA #34 (same agitator, 0.6+° AKO motor, RB HYC B8 Edge bit) 9/10/2017 9/10/2017 1.30 PROD4 DRILL PULD T Complete PD BHA #34 (agitator, 0.6"+ 0.0 78.0 00:00 01:18 AKO motor, RB HYC B8 Edge bit), slide in cart, stab coil, check pack -offs, open EDC, tag up, set depth counters 9/10/2017 9/10/2017 2.40 PROD4 DRILL TRIP T Begin RIH with BHA #34, close EDC, 78.0 12,587.0 01:18 03:42 test agitator at 500', good, continue RIH Note: Crew performed "Spill Drill", excellent response time & communication 9/10/2017 9/10/2017 0.20 PROD4 DRILL DLOG T Log K1 for+11' correction 12,587.0 12,638.0 03:42 03:54 9/10/2017 9/10/2017 0.50 PROD4 DRILL TRIP T Continue RIH 12,638.0 14,050.0 03:54 04:24 9/10/2017 9/10/2017 2.60 PROD4 DRILL DRLG P Tag bottom at 14,050' ( higher than 14,065.0 14,210.0 04:24 07:00 expected (expected 14,065'), attempting to build, pumping 1.4 bpm, FS=665 psi, CWT=4K, WOB= 3.5K, annular = 3916 psi, unable to drill ahead, PU, bring up rate to 1.8 bpm, RBIH to 14,065 (expected bottom depth), FS = 1000 psi, CWT = 8.5K, WOB = 2K Page 39151 Report Printed: 912 712 01 7 ,J- Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slart.Thine End Tine our (hr) Phase Op Code Activity Code Time P -TX Operation Staut Depth End nepm(RKB) 9/10/2017 9/10/2017 1.60 PROD4 DRILL DLOG T PU Wt40 k Itis PU to catch missed 14,210.0 14,127.0 07:00 08:36 survey. No success. Slow tripping rate, slow pump rate, park. No success. Pull up hole to re shoot old surveys, no success. Troubleshoot tools, research magnetic storm info, all indications are a tool failure. 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Decision made to trip for tool 14,127.0 6,036.0 08:36 10:18 PUH into casing, Open EDC, Pump 2.20 bpm and POOH 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Pipe pin holed as it came across the 6,036.0 88.0 10:18 12:00 goose neck. - 6030' pin hole -15' off end of goose neck. Parked, down on pumps, bled pressure, upper checks holding. Eased coil onto the storage reel and marked hole with paint. Continued out of hole. 9/10/2017 9/10/2017 1.50 PROD4 DRILL PULD T Bumpup, PUD+LDBHA#34 88.0 0.0 12:00 13:30 9/10/2017 9/10/2017 0.50 PROD4 DRILL CTOP T Clean floor, install nozzle and stab on. 0.0 0.0 13:30 14:00 9/10/2017 9110/2017 3.00 PROD4 DRILL DISP T Line up coil to displace Power Pro w 0.0 0.0 14:00 17:00 water, -0.5 bpm, 1100 psi, returns to the pit. HES N2 PJSM and rig up. 9/10/2017 9/10/2017 1.50 PROD4 DRILL DISP T Water back to the pits, divert returns 0.0 0.0 17:00 18:30 to the TT, Halliburton cooling down PT to 3,500 psi., blow down surface lines & reel with N2, bleed down WHP & coil pressure, HES rig down 9/10/2017 9/10/2017 2.70 PROD4 DRILL CTOP T Pumping managed pressure (1000 0.0 0.0 18:30 21:12 psi), align inner reel iron, slide back cart, lock out & chain reel, lock out injector, remove bulkhead & inner reel iron, cut a -line, remove depth counters Peak moved reel #5772 to 1 ES by 20:00 firs to begin MU plates & spacers. Notification given to AOGCC for early BOPE test (10:00am 9/11), witness waived by Jeff Jones. 9/10/2017 9/11/2017 2.80 PROD4 DRILL CTOP T PJSM, install grapple, pull test, 0.0 0.0 21:12 00:00 unstab, wind up, & secure coil in prep for reel swap, cut coil 9/11/2017 9/1112017 3.00 PROD4 DRILL CTOP T PJSM, stack cable, unlock reel, dg up 0.0 0.0 00:00 03:00 shackles/slings, remove saddle clamps, 9/11/2017 9/11/2017 2.30 PROD4 DRILL CTOP T PJSM, Lift reel from saddles, drop 0.0 0.0 03:00 05:18 hubs & spacers, SUPS remove stripper, inspect brass Note: Losing -1 bbVhr pumping MP 9/11/2017 9/11/2017 6.70 PROD4 DRILL CTOP T Remove & replace A -frame, Cut 0.0 0.0 05:18 12:00 remaining coil in pipe shed, clean stripper and replace brass. Page 40151 Report Printed: 9127120171 AF� Operations Summary (with Timelog Depths) ft 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tfine Log start cape, Start Time End Time Dur(hr) Phase Op Code AcWny Code Time P -T -X Openewn (PI®) End Depth (fdQ3) 9/11/2017 9/11/2017 6.00 PROD4 DRILL CTOP T Flush lines, remove and replace Rt 0.0 0.0 12:00 18:00 and R3, Re install stripper brass, PJSM, Load storage reel onto Peak bed truck. Crew change 9/11/2017 9/11/2017 4.00 PROD4 DRILL CTOP T pick up stripper and QTS, skid cart, 0.0 0.0 18:00 22:00 install night cap, grease stack and valves, central shops valve crew greased tree valves, flood up. 9/11/2017 9/12/2017 2.00 PROD4 WHDBOP BOPE P BOP Start time 10:00 - Wintess 0.0 0.0 22:00 00:00 waived by Jeff Jones AOGCC Test #1, swab - good Test #2, Lower blind, TV2 - good Test #3, TV 1, - good Test #4, Upper blind, B1&5, C 4,5,8,&12, R1, Bleedert - good Test #5, C 3,6,7,&11 B2&6 and T2 - ran out 5 min -good Test #6, Manual ChokeD and Super Choke C, - good Test #7, C2, 10 and T 1 - good Test #8, R1, Bleeder 2, Charlie 1 &9 - good 9112/2017 9/12/2017 3.00 PROD4 WHDBOP BOPE P Continue BOPE test 0.0 0.0 00:00 03:00 Test #9, Bravo 4 &8, Romeio 3, &. Bleeder 3 -good Test #10, Bravo 3 & 7 - good Test #11, annular BOP, - good Test #12, Upper 2-3/8" pipe slip rams, upper TIW valve - good Test #13, Lower 2-3/8" pipe slip rams - good Test #14, Lower 2" pipe slip rams - fail/pass Test #15, Upper 2" pipe slip rams, lower TIW valve - good Accumulator draw down test, good No inner reel iron test, waiting on reel Test complete in 5 hrs. 9112/2017 9/12/2017 3.00 PROD4 DRILL CTOP T Blow down chokes, clean down lower 0.0 0.0 03:00 06:00 mast, inspect chokes, grease R1, 2, & _ 3, lay down test joint, install spacer on hub, prepping CTS counter for reel install 9/12/2017 9/1212017 4.00 PROD4 DRILL CTOP T Continue prepping to ensure rig is 0.0 0.0 06:00 10:00 ready for reel install, change out rubber on inner reel iron, various rig cleaning projects... 9/12/2017 911212017 8.00 PROD4 DRILL CTOP T Installed rebuild INJH counter 0.0 0.0 10:00 18:00 assembly, prep/dress grapple connector for new coil, install spacer plate on reel motor hub, clean INJH blocks, stock pits with sack products, two hands went to Deadhorse to help With reel mods, Build Bulk Head, test gas alarms, inspect lighting around rig, inspect elevators, work on work orders, and mop around rig. Make trip to Deadhorse to inspect work on spool. Page 41151 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 ,. Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Steed End Tune Our thO Phase O cede P Aad Code �M' Time P -T -X O ration pe Sfart Depth n De EM Deem (tlKa) 9/12/2017 9/12/2017 1.50 PROD4 DRILL SFTY T Hold Nabors global safety week kick 0.0 0.0 18:00 19:30 off meeting / CTD performance YTD with Patrick Doherty and Kazeem Adegbola 9/1212017 9/13/2017 4.50 PROD4 DRILL CTOP T Prep reel area for new spool, Service 0.0 0.0 19:30 00:00 level wind, Clean gripper blocks, Change oil in right angle drives. Work orders 9/13/2017 9/13/2017 6.00 PROD4 DRILL CTOP T Continue prepping for next reel install 0.0 0.0 00:00 06:00 9/13/2017 9/13/2017 10.00 PROD4 DRILL CTOP T Torqued up all pillow block bolts, put 0.0 0.0 06:00 16:00 together all tools and parts for intalling hubs, inspected SRUs and replaced tie back lines, inspected all re -heading equipment, hooked back up drawwork camera, sent 2 rig hands to Deadhorse to assist on spool mods, shipped all tubing cribbage back to warehouse. - 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T Replace INJH motor#2 with new style 0.0 0.0 16:00 18:00 coupler 9/13/2017 9/1312017 1.50 PROD4 DRILL CTOP T Crew change, continue replacing 0.0 0.0 18:00 19:30 coupler on motor # 2 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T New CT string on location. Swap out 0.0 0.0 19:30 21:30 nuts on hub adapters and double check torque. 911312017 9/14/2017 2.50 PROD4 DRILL CTOP T Coupler upgrade complete. Spot in 0.0 0.0 21:30 00:00 reel on flatbed and rig up to pick. Pick up string and install. Torque up saddle clamps, Rig up stabbing grapple to CT and pull test 9/14/2017 9/14/2017 2.50 PROD4 DRILL CTOP T Pull CT into injector, Rig down 0.0 0.0 00:00 02:30 stabbing cable. Trim 7' of coil to find wire. Test wire, 550 MOhmes, 50.1 Ohmes Good test 9/14/2017 9/14/2017 3.50 PROD4 DRILL CTOP T PJSM to install inner reel iron and CT 0.0 0.0 02:30 06:00 connector- Prep CT for CT connector and install. 9/14/2017 9/14/2017 8.50 PROD4 DRILL CTOP T Crew change, install bulkhead (5/16 th 0.0 0.0 06:00 14:30 cable) and junction box, line up wash pipe inside reel, with new clamp, check inner reel iron and secure, head -up BHI upper quick, change pac-offs, slab INJH, fluid pack reel 9/14/2017 9/1412017 0.80 PROD4 WHDBOP BOPE T Test and chart inner reel and stripper 0.0 0.0 14:30 15:18 test 9/14/2017 9/14/2017 1.00 PROD4 DRILL CTOP T Displace reel to drilling fluid, PT CTC 0.0 0.0 15:18 16:18 4,000 psi 9/14/2017 9/14/2017 1.50 PROD4 DRILL PULD T PJSM, MU/PD drilling BHA# 35m M/U 0.0 78.2 16:18 17:48 to coil and surface test, Start BHI NPT @16:55 9/14/2017 9/14/2017 3.30 PROD4 DRILL TRIP T Trip in well, No CTK depth, plug in 78.2 12,171.0 17:48 21:06 encoder, @ 11895' CTES EOP counters are off- 100'. Injector counters off depth, Clean counters on way in hole. New CT string appears to have an anti corrosion coating allowing counters to slip Page 42151 Report Printed: 912 712 01 7 -, Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slatl Time Entl Time (hr)Stan Our (hr)Phase Op Code Activity Code Time P -T -X Operation (flKB) Ertl Depth (11)(13) 9/14/2017 9/14/2017 0.70 PROD4 DRILL DLOG T Log RA for+424' Again clean 12,171.0 12,330.0 21:06 21:48 counters, CT still has some coating on it 9/14/2017 9/1412017 1.50 PROD4 DRILL TRIP T Continue in hole, Perform check 12,330.0 14,179.0 21:46 23:18 surveys, slow down to get gamma info to compare with earlier logs 13874 to 13890'- Depths off 9114/2017 9/15/2017 0.70 PROD4 DRILL WPRT P 14179 appears to be bottom, Come up 14,179.0 13,752.0 23:18 00:00 to 1.5 BPM, wiper up hole circulating drilling fluid, cleaning up CT string, PUW=40K, Start dragging heavy @ 14009, RBIH, PUH pulling 50-55K 14009 to 13752 END BHI NPT @ 23:19 for 6.4 Hrs "` TT NPT BHI MWD DGS 11.0 him 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT P Continue up hole to tie into gamma 13,752.0 13,630.0 00:00 00:12 signature @ 13850' 9/15/2017 9/1512017 0.30 PROD4 DRILL WPRT P RBIH, Setdown @ 13842, Attemp to 13,630.0 13,840.0 00:12 00:30 tie in sticky hole conditions preventing maintaining logging speed 9/15/2017 9/15/2017 0.40 PROD4 DRILL. WPRT P Wiper up hole to log RA, PUW=40K 13,840.0 12,650.0 00:30 00:54 9/15/2017 9/15/2017 0.40 PROD4 DRILL DLOG P Log RA for+30.5' correction 12,650.0 12,727.0 00:54 01:18 9/15/2017 9115/2017 1.30 PROD4 DRILL WPRT P Wipe back in hole, redo check shot 12,727.0 14,210.0 01:18 02:36 surveys 9/1512017 9/15/2017 4.00 PROD4 DRILL DRLG P 14,210% Tag bottom where it is 14,210.0 14,341.0 02:36 06:36 supposed to be. 13,850 to 14,000' area has cleared up. Drill ahead 1.8 BPM @ 5286 PSI FS, BHP=4260, RIW=-2K, DHWOB=I K, WHP=O, ECD=12.8, ROP 40 to 65 FPH *" New Mud at the bit 14,336' Old Mud stats; 1,546' DF, 0.75% DS 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,341.0 14,341.0 06:36 07:06 perfrom check shots, unable to get clean survey's, confer with town, phone in survey IFR to Sperry Drilling/Haliburton survey management analyst 9/1512017 9/15/2017 1.50 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,750 psi, BHP 14,341.0 14,354.0 07:06 08:36 3,970, WHP 20, IA 0, OA 417, CTSW=2 k, DHWOB=1.5 k, ROP 10 fph 9/1512017 9/15/2017 0.25 PROD4 DRILL WPRT T PUH, perform check shots, getting 14,354.0 14,354.0 08:36 08:51 clean survey's, RBIH 9/15/2017 9/15/2017 3.25 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,715 psi, BHP 14,354.0 14,490.0 08:51 12:06 3,973, WHP 20, IA 0, OA 417, CTSW=O k, DHWOB=1.0 k, ROP 51 fph 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,490.0 14,490.0 12:06 12:18 perfrom check shots, able to get clean _ survey's Note: Kick While drilling drill Page 43151 ReportPrinted: 9/2 712 01 7 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stmt Depth Start Time End Time our (hr) phase Op code Activity Coda Time P -T -X Operation (ftK) End Depth (MB) 9/15/2017 9/15/2017 2.85 PROD4 DRILL DRLG P BOSD, 1.8 bpm at 4,715 psi, BHP 14,490.0 14,595.0 12:18 15:09 4,010, WHP 24, IA 0, OA 454, CTSW=1.7 it, DHWOB=1.5 k, ROP 60 fph 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 13,850', PUW 34 k 14,595.0 13,850.0 15:09 15:39 9/15/2017 9/15/2017 0.20 PROD4 DRILL DLOG P Log up to check depth from 13,915' - 13,850.0 13,915.0 15:39 15:51 13,872', depth ok 9/15/2017 9/152017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 2 it. 13,915.0 14,595.0 15:51 16:21 9/15/2017 9/15/2017 0.25 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,610 psi, BHP 14,595.0 14,595.0 16:21 16:36 4,145, WHP 24, IA 0, OA 456, CTSW=minus 2 k, DHWOB=minus 5.9 k, ROP 30 fph 9/15/2017 9115/2017 0.50 PROD4 DRILL WPRT T Counter locked up, wiper up hole to 14,595.0 12,720.0 16:36 17:06 log R4 marker for depth control, PUW=35K 9/15/2017 9/15/2017 0.20 PROD4 DRILL DLOG T Log Tie in for +9.5' correction 12,720.0 12,571.0 17:06 17:18 9/15/2017 9/15/2017 0.80 PROD4 DRILL WPRT 'T Wiper back in hole to drill 12,571.0 14,603.0 17:18 18:06 9/152017 9/15/2017 1.90 PROD4 DRILL DRLG P 14603', Drill, 1.77 BPM @ 4835 PSI 14,603.0 14,640.0 18:06 20:00 FS, BHP=4090. RIW=1.7K, DHWCB=.8K 9/15/2017 9/152017 0.20 PROD4 DRILL WPRT P Pull BHA wiper, PUW=37K 14,640.0 14,640.0 20:00 20:12 91152017 9116/2017 3.80 PROD4 DRILL DRLG P 14640', Drill, 1.79 BPM @ 4735 PSI 14,640.0 14,759.0 20:12 00:00 FS, BHP=4735 9/16/2017 9/16/2017 4.40 PROD4 DRILL DRLG P 14,759', Drill ahead, 1.78 BPM @ 14,759.0 14,858.0 00:00 04:24 4735 PSI FS, BHP=3950, RIW=-4.8K, DHWOB=I.2K 9/16/2017 9/16/2017 0.20 PROD4 DRILL WPRT P Pull BHA Wiper, PUW=34K, Stacking, 14,858.0 14,858.0 04:24 04:36 low surface weight, Low ROP, tough getting back to bottom, pull 100' trip 9/16/2017 9/16/2017 - 1.50 PROD4 DRILL DRLG P 14858, Drill, 1.79 BPM @ 4752 PSI 14,858.0 14,907.0 04:36 06:06 FS, BHP=3955, RIW=2.55K off bottom 9/16/2017 9/16/2017 2.00 PROD4 DRILL DRLG P Lower pump rate to gain ROP, PUW 14,907.0 14,959.0 06:06 08:06 35 k, 1.5 bpm at 4,070 psi FS, IA 0, OA 523BHP 3,940, WHP 0, CTSW minus 2.0 k, DHWOB=0.3 k, ROP 29 fph 9/16/2017 9/16/2017 2.50 PROD4 DRILL DRLG P PUH, by-pass screens, pump 20 14,959.0 15,000.0 08:06 10:36 beads x 20 active x 20 beads, BOBD, 1.81 bpm at 5,170 psi, BHP 4,045, WHP 0, IA 0, OA 524, CTSW=minus 2.0 k, DHWOB 0.4 k, IA 0, OA 523 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 14,000', PUW 34 k 15,000.0 14,000.0 10:36 11:06 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 1.0 k, 14,000.0 15,000.0 11:06 11:36 9116/2017 9/16/2017 0.20 PROD4 DRILL DRLG P BOBD, 1.19 bpm at 5,025 psi FS, 15,000.0 15,007.0 11:36 11:48 BHP 4,055, WHP 0, CTSW=minus 2.0 k, DHWOB=0.6 k, IA 0, OA 522 9/16/2017 9/16/2017 1.00 PROD4 DRILL WPRT P Packing off, annular pressure 15,007.0 12,720.0 11:48 12:48 increased 200 psi, wiper up hole for a lie in, pump 5x5 sweep, clean ECB Page 44/51 ReportPrinted: 9/2712017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log tart STrine End Time Dw(hr) Phase Op Code Aotiv'ity Code Time P-T-X Opembon S MDepm (M<13) End DepffiIWB) 9/16/2017 9/16/2017 0.20 PROD4 DRILL DLOG P Log RA correction of plus 10.5' 12,720.0 12,754.0 12:48 13:00 9/16/2017 9116/2017 0.70 PROD4 DRILL WPRT P Wiper back in hole, RIW minus 2.0 k 12,754.0 15,015.0 13:00 13:42 9/16/2017 9/16/2017 1.60 PROD4 DRILL DRLG P BOBD, 1.82 bpm at 5,250 psi, BHP 15,015.0 15,037.0 13:42 15:18 4,105, WHIP 0, IA 0, OA 522, CTSW=1.0 k, DHWOB=0.6 k, ROP 21 fph 9/16/2017 9/16/2017 0.20 PROD4 DRILL WPRT P P/U for weight transfer / slight packing 15,037.0 15,037.0 15:18 15:30 off, PUW=45K 9/16/2017 9/16/2017 2.80 PROD4 DRILL DRLG P 15037', Drill, 1.42 BPM @ 4040PSI 15,037.0 15,119.0 15:30 18:18 FS, BHP=4065, RIW=-7K @ 1.4K DHWOB 9/16/2017 9/16/2017 1.30 PROD4 DRILL WPRT P Pull 100' wiper, PUW=39K, Cannot 15,119.0 15,119.0 18:18 19:36 get back to bottom. Pull 1000' wiper 9116/2017 9/16/2017 2.40 PROD4 DRILL DRLG P 15117', Drill, 1.77 BPM @ 5022 PSI 15,119.0 15,153.0 19:36 22:00 FS, BHP=4051, RIW=-2K@ 12K DHWOB, Pump 10 BBI beaded pill @ 19:45 9/16/2017 9/16/2017 0.30 PROD4 DRILL WPRT P Pull 100'wiper, PUW=35K 15,153.0 15,153.0 22:00 22:18 9/16/2017 9/1712017 1.70 PROD4 DRILL DRLG P 15153', Drill, 1.69 BPM @ 4700 PSI 15,153.0 15,186.0 22:18 00:00 FS, BHP=4032, RIW=-2K @ 1K DHWOB 9/17/2017 9/17/2017 0.30 PROD4 DRILL DRLG P Continue drilling ahead, 1.69 BPM @ 15,186.0 15,188.0 00:00 00:18 4700 PSI FS, BHP=4037 9/17/2017 9/17/2017 0.20 PROD4 DRILL WPRT P Low weight, Pull 100'BHA wiper, 15,188.0 15,188.0 00:18 00:30 PUW=34K 9/17/2017 9117/2017 0.90 PROD4 DRILL DRLG P 15188 D611,1.67 BPM @ 4772 PSI 15,188.0 15,200.0 00:30 01:24 FS, BHP=4066, RIW -4-5K @ 1.4K DHWOB 9/17/2017 9/17/2017 0.30 PROD4 DRILL WPRT P Low weight, Pull 100'BHA wiper, 15,200.0 15,200.0 01:24 01:42 PUW=35K 9/17/2017 9/17/2017 1.50 PROD4 DRILL DRLG P 15200', Drill. 1.67 BPM @ 4787 PSI 15,200.0 15,211.0 01:42 03:12 FS, BHP=4066 Pumped 10 BBI beaded pill @ 2:31 9/17/2017 9/17/2017 1.00 PROD4 DRILL WPRT P 1 00'Wiper, PUW=34K, Got back to 15,211.0 15,211.0 03:12 04:12 bottom and could not get drilling, Pull 400'wiper, PUW=32K, Pumped 10 BBI Beaded pill 3:05 and 4:00 9/17/2017 9/1712017 2.20 PROD4 DRILL DRLG P 15211', Drill, 1.69 BPM @ 7987 PSI 15,211.0 15,224.0 04:12 06:24 FS, BHP=4097 9/17/2017 911712017 0.30 PROD4 DRILL WPRT P 200', wiper up hole, PUW 31k, pump 15,224.0 15,224.0 06:24 06:42 5x5 low/high 9/17/2017 9/17/2017 8.00 PROD4 DRILL DRLG P 15,224', BOBD 1.40 bpm at 3950 psi 15,224.0 15,305.0 06:42 14:42 FS, BHP 4000, WHP 0, IA 0, OA 535, CTSW=minus 7.0 k, DHWOB=2 k, ROP=1.7 k, low ROP, weight transfer issues. 9117/2017 9/17/2017 0.50 PROD4 DRILL WPRT P Pump 10x10 sweep, clean hole 15,305.0 15,305.0 14:42 15:12 9/17/2017 9/17/2017 4.50 PROD4 DRILL TRIP P POOH, laying in 45 bbis beaded pill, 15,305.0 71.6 15:12 19:42 perform 300' jog from 550 feet. No additional cuttings over the shaker 9/17/2017 9/17/2017 1.70 PROD4 DRILL PULD P At surface, PJSM, PUD BHA #35 71.6 0.0 19:42 2124 Page 45151 Report Printed: 912712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TI'rl LoLog Sten Tme Ertl rine Dur thin Phase O Cotle P ArAv code M Tune P-- T % Operation Sten Depth (110) End Depth MKS) 9/17/2017 9/17/2017 2.40 PROD4 DRILL PULD P PJSM, WU lower section of tool, FVS, 0.0 78.2 21:24 23:48 agitator, 2 3/8".5' motor, RR HYC bit. PD BHA #36. Check pack offs, Change out checks in UQC. WU to coil and surface test. Strip on well 9/17/2017 9/18/2017 0.20 PROD4 DRILL TRIP P Trip in well, shallow test agitator, 78.2 400.0 23:48 00:00 continue in well 9/18/2017 9/18/2017 2.20 PROD4 DRILL TRIP P Continue in well after shallow agitator 400.0 12,595.0 00:00 02:12 test 9/18/2017 9/18/2017 0.20 PROD4 DRILL DLOG P Log K1 for +7.5, PUW=29K 12,595.0 12,622.0 02:12 02:24 9/18/2017 9/18/2017 2.00 PROD4 DRILL TRIP P Continue in well, clean pass through 12,622.0 15,315.0 02:24 04:24 window, clear through 13850 to 14,000'. Last 30'tight hole conditions with low surface weight, DHWOB with no differential pressure. Annular pressure fluctuating. Multiple pick ups to work to bottom 9/18/2017 9118/2017 5.50 PROD4 DRILL DRLG P 15315', Drill, 1.62 BPM @ 4863 PSI 15,315.0 15,382.0 04:24 09:54 FS, BHP=4228, DHWOB=l.4K RIW=- 4.6K BHA Wipers 16328',15340',15357', 15372, 15382', PUW 35-38 k 9/18/2017 9/18/2017 0.50 PROD4 DRILL CIRC P Pump 10x10 sweep, followed by 15,382.0 15,366.0 09:54 10:24 beaded drilling fluid pill 9/18/2017 9/1812017 2.85 PROD4 DRILL WPRT P POOH, laying in drilling fliud beaded 15,366.0 1,533.0 10:24 13:15 pill, little motor work as well as over pulls thou 13850' area, continue POOH •" Perform 300' jog at 1,500- 9/1812017 9/1812017 0.15 PROD4 DRILL SVRG P Adjust goose neck 1,533.0 1,533.0 13:15 13:24 9/18/2017 9/18/2017 0.40 PROD4 DRILL WPRT P Continue wiper to surface, testing 1,533.0 78.2 13:24 13:48 agitator (good test) 9/18/2017 9/18/2017 0.15 PROD4 DRILL TRIP P At surface, re -set counters 78.2 78.2 13:48 13:57 9/18/2017 9/18/2017 2.00 PROD4 DRILL TRIP P RBIH, to confirm TD 78.2 12,600.0 13:57 15:57 9/18/2017 9/18/2017 0.25 PROD4 DRILL DLOG P Log the K1 marker correction of plus 12,600.0 12,644.0 15:57 16:12 4.5' 9/18/2017 9118/2017 0.25 PROD4 DRILL TRIP P PUW 28 it, continue IH, perform static 12,644.0 12,710.0 16:12 16:27 pressure check at 12710' bit depth, sensor depth 6,172 TVD, 3,723 psi AP, 11.7 ppg, and dropping. Continue IH thou window 9/18/2017 9/18/2017 1.25 PROD4 DRILL TRIP P Continue IH, RIH 8 k 12,710.0 15,380.0 16:27 17:42 9/18/2017 9/18/2017 0.50 PROEM DRILL CIRC P Confirmed TD 15,380', circulate 12.0 15,380.0 15,380.0 17:42 18:12 ppg beaded liner pill into coil. 9/18/2017 9/18/2017 3.50 PROD4 DRILL TRIP P POOH, laying in 12.0 ppg liner running 15,380.0 78.2 18:12 21:42 pill with beads up to 12070', painting EOP flags at 10,900' (white) & 1:3,600' (yellow) 9/18/2017 9/18/2017 0.50 PROD4 DRILL OWFF P At surface, check well for flow, PJSM 78.2 78.2 21:42 22:12 - for LD drilling BHA on a dead well 9/18/2017 9/18/2017 1.00 PROD4 DRILLPULD P LD Drilling BHA# 36 78.2 0.0 22:12 23:12 Page 46/51 Report Printed: 01 7 975M Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tillie Log Stan Depth Start Tme EM Time ow (hr) Phase Op Cade Activity Code Time P -T -X Opembon Mks) End Depth (N(9) 9/18/2017 9/18/2017 0.50 PROD4 DRILL PULD P Function test BOP stack 0.0 0.0 23:12 23:42 9/18/2017 9/19/2017 0.30 COMPZ4 CASING PULD P Prep rig floor for PU liner assembly 0.0 0.0 23:42 00:00 ' 9/19/2017 9/19/2017 - 0.30 COMPZ4 CASING CTOP P Continue preeping floor to run liner, 0.0 0.0 00:00 00:18 PJSM to run liner 9/19/2017 9/19/2017 2.10 COMPZ4 CASING PUTS P M1U lower AL2 -01 liner segment with 0.0 1,673.8 00:18 02:24 non ported bullnose, 2 pups, 2 tracers # T912 Blue and T740 Freen. 39 As slotted liner and shorty deployment sleeve. 9/1912017, 9/19/2017 1.70 COMPZ4 CASING PULD P PJSM, P/U coil trak with GS Spear, 1,673.8 1,718.0 02:24 04:06 M/U to liner. Set in slips, Skid injector. Swap out checks in UOC. Check pack offs, Make up to coil and surface test 9/19/2017 9/19/2017 1.40 COMPZ4 CASING TRIP P RIH BHA # 37, AL2 -01 lower liner- 1,718.0 12,619.0 04:06 05:30 segment 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Correct to 10,600' EDP flag for+4' 12,614.0 12,618.0 05:30 05:36 correction, PUW=32K, DHWOB=BK 9119/2017 9/19/2017 5.70 COMPZ4 CASING TRIP P Continue in well, Clean trip through 12,618.0 15,380.0 05:36 11:18 window and past billets. Initial setdown @ 13475. Work pipe to get -5-15 feet per cycle. Clean pick ups @ 34-00K. Got clear @ 14,700'to TD @ 15380 9/19/2017 9/19/2017 0.30 COMPZ4 CASING TRIP P Liner on bottom, PUW=55K, Bring 15,380.0 13,706.2 11:18 11:36 pumps online @ 1.513PM, PUW=30K. Liner released. PUH and remove liner length left in hole from counters, 1673.82' 9/19/2017 9/19/2017 0.40 COMPZ4 CASING TRIP P Trip out of hole, Paint 12,700' EOP 13,706.2 12,580.0 11:36 12:00 flag - Uncorrected 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Log K1 for+4' correction 12,580.0 12,614.0 12:00 12:06 9/1912017 9/19/2017 2.10 COMPZ4 CASING TRIP P Continue trip out of well, Paint EDP 12,614.0 68.5 12:06 1412 flag @ 11,700' 9/19/2017 9/19/2017 0.60 COMPZ4 CASING PULD P At surface, Flow check, PJSM. Lay 68.5 0.0 14:12 14:48 down liner running tools 9/1912017 9/19/2017 0.50 COMPZ4 CASING PULD P R/U floor to run liner, PJSM Run AL2- 0.0 0.0 14:48 15:18 01 upper liner segment 9/19/2017 9119/2017 2.10 COMPZ4 CASING PUTB P M/U 1.2-01 upper liner segmet with 0.0 849.5 15:18 17:24 ported bull nose, 21 As slotted liner, and shorty deployment sleeve, Perform BOP kick while running liner drill, slide in cart, check packoffs, 9/19/2017 9/19/2017 2.70 COMPZ4 CASING RUNL P RIH with 1-2-01 Run #2, tie into 849.5 0.0 17:24 20:06 window flag for a +8.5' correction, lie into K1 for O' correction, continue RIH to set depth (tagged at 13,707'), PUW = 38K, RBIH, bring up pumps to 1.4 bpm, PUW = 30K, sheared off liner 9/19/2017 9/19/2017 2.50 COMPZ4 CASING TRIP P Trip to surface, flow check well, PJSM 13,707.0 45.0 20:06 22:36 9/19/2017 911912017 0.90 COMPZ4 CASING PULD P LD BHA #38, observe flat spot - T up 45.0 0.0 22:36 23:30 from EDP, within spec (.124" measured for .175" pipe) 9/19/2017 9/20/2017 0.50 COMPZ4 CASING PULD P PU BHA #39 (ported bull -nose, 3 pup 0.0 50.0 23:30 00:00 jnts, OH anchor & aluminum billet) Page 47151 Report Printed: 9/27/2017 . Operations Summary (with Timelog depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Tare End rune Ourty) Phase Op Code Activity Code Time PJA Operabon WE) End Depth ff K13) 9/20/2017 9/20/2017 0.50 COMPZ4 CASING PULD P Continue PU BHA #39 (ported bull- 50.0 100.0 00:00 00:30 nose, 3 pup jnts, OH anchor & aluminum billet), slide in cart, stab on, open EDC, tag up, set counters 9/20/2017 9/20/2017 3.60 COMPZ4 CASING RUNL P RIH with BHA #39, lie in for+3' 100.0 12,857.0 00:30 04:06 correction, weight check = 32K, Gose EDC, continue RIH to set depth, PUW = 33K, RBIH to set depth (12,856.6), orient anchor 10' ROHS, bring up pumps, release off anchor, set down weight 4.5K WOB, good set 9/20/2017 9/20/2017 2.10 COMPZ4 CASING TRIP P POOH 12,857.0 73.0 04:06 06:12 Note: Spill Drill (Pits) 9/20/2017 9/2012017 1.20 COMPZ4 CASING PULD P PJSM, Flow check well, lay down BHA 73.0 0.0 06:12 07:24 # 39, Ahchor billet running tools 9/20/2017 9/2012017 0.70 PROD5 STK PULD P ' PJSM, M/U BHA #40 to kick off liner 0.0 72.2 07:24 08:06 top billet with 1.7° motor RR HYC bi center, M/U to coil and surface test. Change packoffs, swap out UQC checks 9/20/2017 9/20/2017 2.30 PRODS STK TRIP P RIH BHA #40 72.2 12,595.0 08:06 10:24 9/20/2017 9/20/2017 0.10 PROD5 STK DLOG P Log K1 for+7' correction 12,595.0 12,629.0 10:24 10:30 9/20/2017 9/20/2017 0.10 PROD5 STK TRIP P RIH 12,629.0 12,700.0 10:30 10:36 9/20/2017 9/20/2017 1.70 PROD5 STK TRIP P Park and displace well back to 8.8 12,700.0 12,700.0 10:36 12:18 PPG PwrPro 9120/2017 9/20/2017 0.10 PROD5 STK TRIP P Close EDC, PUW=33K, Trip in, clean 12,700.0 12,745.0 12:18 12:24 pass through window 9/20/2017 9120/2017 0.10 PROD5 STK DLOG P Log RA for -2.5' correction 12,745.0 12,749.0 12:24 12:30 9/20/2017 9/20/2017 0.20 PROM STK TRIP P Continue in hole, Dry tag billet @ 12,749.0 12,818.0 12:30 12:42 12818, PUH 9/20/2017 9/20/2017 0.90 PRODS STK KOST P Bring pups on line, 1.69 BPM @ 4320 12,818.0 12,818.5 12:42 13:36 PSI FS, BHP=3945, RIW=13.1K, start milling @ 12817, made 12818.5 then had multiple stalls, reduce pump rate to 1.4BPM and work through 9/20/2017 9/20/2017 5.00 PRODS STK KOST P Go to 2 FPH, continue to stall, working 12,818.5 12,819.0 13:36 18:36 multiple TF's, decision made to POOH & PU agitator 9/20/2017 9/20/2017 2.40 PROD5 STK TRIP P POOH for agitator, park above 12,819.0 72.0 18:36 21:00 window, open EDC, swap from choke A to choke B, choke fully open though still holding -1000 psi pumping minimum rale, trouble shoot, tag up 9/20/2017 9/20/2017 2.20 PROD5 STK PULD P Continue to trouble-shoot choke issue. 72.0 0.0 21:00 23:12 Decison made to PUD, then continue to trouble shoot issue once on MP, checks not holding, continue PUD, open & cleaned choke A & B (significant large, rounded, shale pieces & aluminum in both chokes) 9/20/2017 9/21/2017 0.80 PROD5 STK PULD P Reconfigure BHA, PJSM, PD BHA# 0.0 50.0 23:12 00:00 I 41 (New B8 XD Edge bit, 1.72 AKO motor, 69 hr agitator), Page 48151 Report Printed: 9127/2017 �. Operations Summary (with Timelog vepths) 3M-27 ConocciPhilhips 6l _aj Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Steri Time End Time DirM Phase Op Code Activity Code Time me P -T -X Operation Stan nDe � xn Erb Dapih (fll®) 9/21/201.7 9/21/2017 1.60 PRODS STK PULD P Continue PD BHA #41, pump across 50.0 78.0 00:00 01:36 the top, choke A & B operating as expected, change out checks, slide in cart, staff on, tag up, EDC closed 9/21/2017 9/21/2017 2.50 PRODS STK TRIP P RIH with BHA#41, surface test 78.0 12,595.0 01:36 04:06 agitator, good, observe eratic choke swings though appears to clear up, possible cuttings from down -hole, nothing unusual observed over shakers 9/21/2017 9/21/2017 0.20 PRODS STK DLOG P Log K1 for+2.5' correction 12,595.0 12,632.0 04:06 04:18 9/21/2017 9/21/2017 0.30 PRODS STK RGRP T Park at 12,632' (install new seats mud 12,632.0 12,632.0 04:18 04:36 pump #2), PUW = 32K 9/212017 9/21/2017 0.30 PRODS STK TRIP P Continue RIH, stack -91K WOB at 12,632.0 12,820.0 04:36 04:54 window, PU, drop rate, RBIH without issue, log RA tag for 0' correction 9/21/2017 9/212017 0.20 PRODS STK KOST P Dry tag 12,820.5', RBIH to continue 12,819.4 12,819.4 04:54 05:06 milling, pumping 1.7 bpm, FS = 1323 psi, circ pressure = 5321 psi, CWT =11 K, WOB =.22K, Start milling @ 12819.4 9/21/2017 9/21/2017 1.00 PRODS STK KOST P Milling off billet, 1.69 BPM @ 5011 12,819.4 12,821.0 05:05 06:06 PSI FS, BHP=3935, 1 FPH, 9212017 9/21/2017 0.50 PRODS DRILL DRLG P Go to 10-15 FPH, 1.7 BPM @ 5011 12,821.0 12,828.0 06:06 06:36 PSI FS, BHP=3990 9/21/2017 9/212017 0.70 PRODS DRILL DRLG P 12,828', Drill ahead, 1.7 BPM @ 5011 12,828.0 12,870.0 06:36 07:18 PSI FS, BHP=3935, RIW=10K, DHWOB=1.9K 9/21/2017 9/21/2017 0.10 PRODS DRILL WPRT P 12870, PUH to drift billet area, 12,870.0 12,870.0 07:18 07:24 PUW=33K, Stack on billet @ 20L, clean @ 30L, RBIH to drill 9/21/2017 9/21/2017 1.40 PRODS DRILL WAIT T Pull off bottom- exploring different 12,870.0 12,870.0 07:24 08:48 well plan options - Ream billet area, Dry drift dean 9/21/2017 9/21/2017 2.50 PRODS DRILL DRLG P Drill ahead working WP4, 1.79 BPM 12,870.0 13,230.0 08:48 11:18 @ 5430 PSI FS, BHP=3960 9/21/2017 9/21/2017 2.90 PRODS DRILL TRIP P - Call end of build, Pump sweeps, Trip 13,230.0 78.0 11:18 14:12 out for lateral BHA, PUW=31 K 9/212017 9/21/2017 1.40 PRODS DRILL PULD P At surface, PJSM, PUD BHA #41 78.0 0.0 14:12 15:36 9/21/2017 9/21/2017 1.90 PRODS DRILL PULD P P/U New bit, C1 with 3D cutters, .5° 0.0 78.0 15:36 17:30 motor, and agitator. PD BHA #42 AL3 lateral drilling BHA. Make up to coil ' and surface test. Check packoffs 9/21/2017 921/2017 2.50 PRODS DRILL TRIP P RIH, surface test agitator, good, stack 78.0 12,595.0 17:30 20:00 weight on GLM at 3,533', PU, reorient TF, continue in-hole 9/21/2017 9/21/2017 0.20 PRODS DRILL DLOG P Log K1 for+4.5' correction 12,595.0 12,635.0 20:00 20:12 9/21/2017 9/21/2017 0.40 PRODS DRILL TRIP P Continue RIH 12,635.0 13,230.0 20:12 20:36 9/21/2017 9/21/2017 2.80 PRODS DRILL DRLG P OBD, FS = 1130 psi, CWT = 8K, WOB 13,230.0 13,630.0 20:36 23:24 = 1.5K, rate in = 1.75 bpm, BHP = 3987 psi, pump sweeps, average ROP over interval = -143 fph 9/21/2017 921/2017 0.30 PRODS DRILL WPRT P WT up -hole, PUW = 32K 13,630.0 12,879.0 23:24 23:42 Page 49151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) phase Op Cade Activity Code Time P -T -X Operation (MB) End Depth (WS) 9/21/2017 9/2212017 0.30 PROD5 DRILL WPRT P WT in-hole, RIW = 6K 12,879.0 13,630.0 23:42 00:00 9/22/2017 9/22/2017 3.80 PROD5 DRILL DRLG P BOBD, FS = 1190 psi, pumping 1.78 13,630.0 14,051.0 00:00 03:48 bpm, CWT = 4.5K, WOB = 1.5K, BHP = 3964 psi, circ pressure = 5399 psi. Begin swapping to mud System #7 at 13,760', new mud at the bit at 13,816', pump sweeps, ROP over interval = 111 fph 9/22/2017 9/22/2017 0.50 PROD5 DRILL WPRT P Wiper up -hole, PUW = 35K 14,051.0 13,050.0 03:48 04:18 9/22/2017 9/22/2017 0.40 PROD5 DRILL WPRT P Wiper in-hole, RIW = 8K 13,050.0 14,051.0 04:18 04:42 9/22/2017 9/22/2017 1.20 PROD5 DRILL DRLG P BOBD, FS = 1120 psi, pumping 1.8 14,051.0 14,182.0 04:42 05:54 bpm, CWT = 4.7K, WOB = 1.3K, BHP = 3952 psi 9/22/2017 9/22/2017 0.10 PROD5 DRILL WPRT P 14182', BHA Wiper, PUW=37K 14,182.0 14,182.0 05:54, 06:00 9/22/2017 9/2212017 0.90 PROD5 DRILL DRLG P 14182', Drill, 1.79 BPM @ 5105 PSI 14,182.0 14,275.0 06:00 06:54 FS, BHP=4010, RIW=2.2K, DHWOB=l.9K 9/22/2017 9222017 0.10 PROD5 DRILL WPRT P 14275', BHA wiper, PUW=37K 14,275.0 14,275.0 06:54 07:00 9/22/2017 9/22/2017 1.40 PROD5 DRILL DRLG P 14275', Drill, 1.79 BPM @ 5105 PSI 14,275.0 14,425.0 07:00 08:24 FS, BHP=4015 9/22/2017 912212017 3.40 PRODS DRILL WPRT P 14425 call TD, Chase 10 X 10 BBL 14,425.0 78.0 08:24 11:48 sweeps to swab valve, PUW=35K 9/222017 9/22/2017 PROD5 DRILL WPRT P Tag up at surface, reset counters, Trip 78.0 12,595.0 11:48 11:48 in hole 9/22/2017 9/22/2017 2.20 PROD5 DRILL DLOG P Log K1 for +1.5'correction, PUW=35K 12,595.0 12,627.0 11:48 14:00 9/22/2017 9/2212017 1.50 PROD5 DRILL WPRT P Continue in hole, clear pass through 12,627.0 14,427.0 14:00 15:30 window, set down @ 12818 at 20 left, went to 30L clean past 9/22/2017 922/2017 3.50 PROD5 DRILL CIRC P Tag 14427' corrected, Trip out 14,427.0 78.0 15:30 19:00 pumping 12 PPG beaded liner pill followed by 12 PPG completion fluid. Paint EOP flags @ 12400,10400' 9/22/2017 9/22/2017 1.50 PROD5 DRILL PULD P Flow check well, good, PJSM, LD 78.0 0.0 19:00 2030 BHA #42 (Cl bit came out a 2-1) 9/22/2017 9/22/2017 2.90 COMPZ5 CASING PUTB P PJSM, PU AL3 liner (non -ported bull- 0.0 1,871.0 20:30 23:24 nose, 47 ints slotted liner, & shorty deployment sleeve), BOP Drill "Running Liner" 9122/2017 9/23/2017 0.60 COMM CASING PULD P PJSM, PU BHA #34, AL3 Liner 1,871.0 1,915.0 23:24 00:00 Running Tools 9/23/2017 9/23/2017 0.70 COMM CASING PULD P Continue PU BHA #43, replace 1,915.0 1,915.0 00:00 00:42 checks, move in cart, MU to coil 9/23/2017 9/23/2017 3.00 COMPZ5 CASING RUNL P RIH with BHA #43, tie into window flag 1,915.0 14,427.0 00:42 03:42 for+8.5' correction, weight check at window = 31 K Set downs at 13,920', 14,157', 14,267', 14,384', &14,397' Tied into TD flag for 0' correction, arrive at setting depth, weight check = 40K, bring up pumps, release off liner, TOL = 12,556' Page 50151 Report Printed: 9/27/2017 Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Tuna End Tune Our (hr) Phew Op Cotle A ,dty cod. Time P -T -X Operation Start Depth (MB) End Depth MKB) 9/23/2017 9/23/2017 0.40 COMM CASING DLOG P Obtain SBHP, tool MD = 12,546', tool 14,427.0 12,541.0 03:42 04:06 TVD = 6,072', annular reached 3774 psi after 20 minutes, 11.95 ppg equivalent 9/23/2017 9/23/2017 3.80 COMM CASING TRIP P Begin pumping seawater down coil, 12,541.0 12,541.0 04:06 07:54 displace well to seawater, diesel freeze protect from 2500' 9/23/2017 9/23/2017 1.40 COMPZ5 CASING PULD P At surface, PJSM PUD BHA #43, 12,541.0 53.0 07:54 09:18 Liner running tools, lay down tools and pull checks from UQC 9/23/2017 9/232017 0.70 DEMOB WHDBOP RURD P Stab back on. Flush rig and jet stack, 0.0 0.0 09:18 10:00 unstab from well 9/23/2017 9/23/2017 1.50 DEMOB WHDBOP MPSP P PJSM, R/U BPV lubricator, set BPV, 0.0 0.0 10:00 11:30 test plug. R/D BPV lubricator and load out 9/23/2017 9/23/2017 4.50 DEMOB WHDBOP NUND P Start working RDMO check list, empty 0.0 0.0 11:30 16:00 pits, Nipple down stack, Check tree bolts Page 51161 Report Printed: 9/27/2017 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M -27A 50-029-22637-01 Baker Hughes INTEQ Definitive Survey Report O6 October, 2017 BAKER JUGHES E: -,,y Cmnpaay: CormeoPhllllps(AlaSka) Inc.-KUp2 Prol.m: Kmpamk Rival Unit Site: KUpamk 3M Patl Well: 3M-27 WellSme: 3M-27 Deagn: 3M-27 Project Kupank River Unit Norah Slope Alaska. United States Map System: US Sbte Plane 1927 (Esul sotmion) System Datum. Geo Datum: `1AD 1927 (NADCON CONUS) Map ton: Alaska Zona a VMI 3M27 r ConocoPhillips Definitive Survey Report Local Coordinate R.Jun .: MI: 3M-27 ND Reference: 3M-27 Q 68.00usd (310-27) MD Reference: 3M-27 ® 68.00uad (3M-27) North Reference: True Survey Calculated Memod: Minimum Curvature Dabtase: EDT Alaska Sancti. Wall p"I a14145 O.W USK Northing: .EOW 000 USK Easing: daemon UOCeRaiMy *NIS 0.00 USK Wellhead Elevation: Walltora 3M -27A (USSR) (UM) Magrmtu Modal M. Sample Date 68.00 BGGM2017 0.00 71112017 Design 3M -27A Data 9252017 Audra Notes: From To Mean Sea Level Using Wall Reference Point Using geodetic scab famor 6.016.60624us8 506.29490n0 USK Latitude: Langtude: Ground Laval: Dip Mpb rr SOSO Vantin: 1.0 Phan: ACTUAL Tie On Depth 12,69245 V.rtul Sactton: Depth Pratn[TVD) *NIS eW-W named n (USSR) (UM) IwR) (1) 68.00 0,00 0.00 20.00 Survey Program Data 9252017 From To Survey (USS) (matt) Survey "11I Taal Nun. Dncdptled Stan Dat. 26500 12,89245 3M-27 (3M-27) MWD MND- Standing 11152001 12.712.59 12)46.03 NMI MWD-INO(3M-2]A) MW INC ONLY MWD -INC ONLY FILLER 91152017 12.778A7 14,950A9 3M -27A MADD(3M-27A) MWD MWD-Slandam fl/182017 70° 27'23,70 N 149° 58' 55.073 W 0.00 .0 FiMd Stnrptt lnTl 57.497 Surrey EM Date 8118201] 9262017 10A1201 ] 4.12:OWKS Poge 2 COMPASS 500014 &185 ✓ Con0CoPhillips ConocoPhillips Definitive Survey Report 491 Company: ConcooPlllll(p6(Maska) Inc.-Kup2 Local Co-ordinate Reference: Well 3M-27 P.0m Kupamk River Unit ND Reference: 3M-27 Q 5800u6h (304.27) See: Kupamk 3M Pad MD Reference: 3Md7®W 00u3h(304-27) MMI]: 304.27 Norm Reference: True Wallbors: 3M-27 Survey Ca16u1atm nlemotl: Minimum Conalare Design: 3M-27 DMINN: EDTAMSke Sandbox Survey MD Inc 491 TYD 14059 04?4lum) V.W(usi Map Map D� W tical luehl 19 ry 1uv111 lush) luertl lural Nohbin9 fasting Sao. Surve Tool Mm Y M) MI 1°n6M1 I, 12.1392.45 41.26 28103 8.195.98 6.12].96 2,54214 g 6,019,139]9 436,42370 114 ge9.]3 MN9JNC ONLY (2) 12,71250 41M 2806 0,211.03 6,14303 2.504.6 -948242 6,019,14230 496,410.]2 029 980.]9 Mµ INCCNLY(2) 12,]48.03 50.29 Mile 6234.40 0,16.40 2,54823 890514 6.019,14481 498,38.18 2].04 492.55 MM -INC ONLY(2) 12,]]847 67M 280.39 6250,90 6182.92 2,554.]5 4,93323 8, 019, 15IN 496,35991 04 3] 497.06 MWD(3) 12,611.58 8543 27398 8,25860 8,190.00 2.658.29 9.955.04 6,610,155.85 48632810 58.18 -1144.24 MAD(3) 12,84014 0948 28453 0.259.89 8,10109 2582.86 9,993.]1 8,019,11450 496,299.43 3883 -lam. MM(3) 12870.95 9332 No 75 6.250.15 6.191.15 2534.06 40.021]6 6,019,171.60 414,2]1.3] 48& -1,000,79 MM (3) 12,90380 83.M 31855 6,257.18 6,189.16 2594.48 -10.047.24 6,019,18195 498,24588 60.17 -09838 MM (3) 12,93801 88.58 335 71 62%. 8,180.56 2,62140 -10.08484 8.019.218.00 49622845 W47 97900 MM (3) 1296582 0902 344.14 6226.98 0,180.90 2.6,1937 -10.8488 8,4718214.04 498.21821 20.50 -06.21 NAD(3) 12.995W 9010 315.19 6.260.00 6.100.98 2,8]8.10 -10,00276 6,019,2]5.63 46,21029 3.M 931.04 MM(3) 13,02]82 9051 man 8.250.78 6.18876 2.709.55 -t0,W015 8.01930890 458,204.88 9W 90189 mm (3) 13054.91 9170 ]4933 6.26120 6,18820 2]3604 -10,09520 6,010,33347 46.19].72 8.84 48138 MM (3) 13084 95 9126 35231 8,25540 8,10740 2.78570 -10,09990 8.018.363.13 401 869 455.49 MWD(3) 13.11977 W83 365.32 8,251.]6 8,188.78 2,800.30 -10,103.71 8.010.39].]3 499,18934 8.73 42425 MM (3) 13.145.03 0088 38.79 6,2543] 6.18437 2,025.51 -10,105.23 6.01942293 436,18.70 BW 40108 M (3) 13,17514 9104 Men 6.253.74 818474 2,855.55 -10,10613 6.01945297 496188.]] 353 -]]316 MM (3) 13,041.]9 90.90 095 6.253.12 8.185.12 288524 -10.106.21 6019,462.14 498.166.8 751 -74526 MM (3) 13234.63 WN 328 0252.12 8,184 12 2,915.04 -10.105.11 8,019,51245 496,18774 1001 -71891 NAND (3) 13,28593 9273 5.33 8.2620 6.10380 2,946.22 -10,IM76 6,019,X9.63 493,19008 8.55 -64!681 MM (3) 13048.6 93R 947 624838 8,180.78 2.9]0.50 -10,008.6 6,019.57596 496IN23 1302 455.00 mm (3) 13,]24.89 9364 825 6,247.30 8,179,30 300443 -1049453 601914104 408,190.25 8.20 42029 MM (31 13,358 22 9317 1014 6,245.52 0.17752 3,637.31 -10,08899 0,019.6N.M 49620370 828 496.6 MND(3) 13,391.12 90.00 1082 6,2M.N 8,1766 3.04814 -10,082.90 6,010,66.03 49626974 10.88 45503 MA9(3) 13,419.27 848 BW 6,24520 8.1]].20 3,097.34 -10,07804 6019.894]5 436,214.6 11.32 42635 MIND (3) 13.4506 8.39 8.94 6,248.6 6,17860 3,120.32 -10,07324 8,019325.74 496,21943 06 Z.59 mm (3) 13,48043 88.10 1133 814710 0.1]9.]0 3,15786 -10.6800 6.019,76.02 49622084 83] 476.28 MM (3) 13,5107] 88]] 1233 6.24861 616.81 3.1829 -10,61]9 6,019,]X]1 496,23083 397 <.26 ~(3) 13540.92 89.82 14.40 8,248.6 0,16.98 3,21662 -10.004.82 8,019.81401 436,237]] 770 418.32 MWD(3) 13.57077 896 1544 6249.10 8,181.10 3.245.46 -10,N713 6.019,01289 496.245.43 3.51 3&x.59 comps i Annotation TIP KOP IMerpolate8 A2imWb First Clean Surrey Ift,IM17 4.'12'06PM Page 3 COMPASS 500014 DudE 85 lv� ConocoPhillips • ConoCoPlllllps DefinMive Survey Report Company: Cpn.Phllllp5(Albke) Inc.-Kup2 Local Coardbale Rabbnce: M11 3M.27 Project Kupamk River Und ND Relebnca: 3M-27 C 60.00uag (3M-27) Bib: Kupamk 3M Pad MD Rebmnce: 3M-27 Q 50.00usg (3M-27) Well: 3M-27 Nonh ReNbn6e: T. 100*11Eob: 3M-27 Survey Cakulation Method: Minimum Curvalum Design: 3M.27 Database: EDTANka Sandbox survey Map Map vinmoal MD Irm Aal TR3 111088 ♦WS •EI -W DIS (usR) 1°I 1°I (uaD) (aeR) (uslo (u ft) Nordling Eawnp (.11000 5emion So,, Tool Name (ft) (4) IR) 13000.02 89.82 1695 6,249.23 6.18123 3.274.12 -10,03881 8,019.671.55 45816373 50 358.80 MWD 131 13,63070 8926 1856 6,24047 6.101.47 3,302,77 -10,029.63 6o199D.20 496,26289 533 328.75 MNN(31 13,66072 8051 M31 6.24980 6.181 GO 3.331.07 -10,01964 6,019928.51 49827205 5.82 -M73 MWp (3) 13,600M 8997 22.89 8,24093 6,181.93 3358n1 -00.000.62 8,010.05835 498,28385 875 -208.81 MND I31 13.72081 81.04 25.75 8249,87 6,18167 338630 4,93,20 8.019.983.83 40,29624 1013 43675 MIM) (3) 13,750.81 9080 27]8 6&921 618121 3,413.16 9,902.70 6,0240109 43,39 ,2 881 808.98 MWD(3) 1378078 89.51 2875 6.249.17 6,18117 3,43956 9,88351 8830,0370 494323.88 511 -177.30 mm (3) 13.81085 88.59 29.96 6.24966 6.181.66 3.46578 9,953.77 8.02000.25 190,33860 505 -14764 MNN (3) 13.840T5 8730 30.10 0150.74 6.182.74 3.01.63 4.93882 SOID,o89.13 45835353 4.31 -11821 MND (3) 13.87082 8548 2635 8,252.63 6,18482 3.51769 AW41n 6,020,11540 49636780 1383 458,72 MND(3) 13,900,70 W..7 24.16 8,251.73 8,180.73 3545.0 8911.82 6.00.14254 496380.38 7,97 5884 MVA (3) 13,930 80 8650 2280 625605 6,168.05 3,572.80 -9899.93 6.@0,170.12 40,392.35 8.01 -2883 MM (3) 13,90070 8014 2351 SMA7 818807 3.600.08 -9,88816 8,020,19.81 496.404.09 305 144 MM (3) 13,09069 W37 '36.86 6,258]9 6.18879 3,02722 9,875.40 8.020,224 76 450,41683 1180 30.88 MN9(3) 14.020.9 03W 2819 6.25578 6,18778 3.0376 890186 6.00.251.33 498.430.65 11,31 W68 Mm 13) 14,OW.71 9470 W61 615363 8.185.63 3.679.89 8&6.0 6,020,2770 498,44533 897 90.14 MVA (3) KOW,70 96M 3189 6,25101 6,18301 3,705.43 49,831 36 6,0203029 496.460 00 469 11944 MWD (3) 14.110.71 9887 029 0,24794 6,17094 3.73044 8016.07 6,044,32844 496,07.07 8.74 14852 MM (3) 14,14071 0,49 3575 804.0 0.170,58 375486 9,79796 8.02.362.44 496,494.15 485 177.31 MWD (3) 14,17069 9588 38A5 6.24140 6,17340 3.778,94 478040 680,376.54 40.51169 354 205.85 MNA (3) 1430066 9316 33.76 6,23809 dill 09 3,902.93 8762.59 8.00.4C054 40,52949 8.50 2M, 58 MND (3) 14,230.82 0123 3701 6337.93 6169.83 3,027.03 874449 6,020AMW 406,5255 645 26342 MM (3) 14.W2G7 900 3743 61379 8,18960 3.851.92 9,70 .59 6,020.448.55 493566.43 4,16 29337 MM (3) 14VO80 8991 3787 8,23781 6,169.61 3,87466 -9,708 IN 6,00,0231 40,58380 1S5 320.9 MM (3) 14,32086 8948 M73 6237.77 0.10977 3.89835 9,00941 8.020.495.92 40,60257 3.24 349.16 MWD (3) 14,NO67 89.05 WV 8.338.15 0,17015 3.921.47 8870.72 47020519.15 490,62133 1.58 377.40 MND 131 14,30078 9008 4079 6,238,38 6.17030 3,914.50 866143 6020.44228 41ld W.51 70 40572 MND 13) 1441078 BOBS 10.91 6,236.14 6.170.14 3,867.28 9,63181 8,020,564.0 496,86.11 270 433.75 MM (3) 14,440,74 900 4321 6,237.67 6,100.87 3,88952 8011 )4 8.02050724 4N.A. 15 7.89 46151 MM (3) 14.47077 9067 44.47 0,237.24 8,16924 4,011.18 -0590.94 0,020,80891 40,7093 430 486.98 MWD (3) 14,50,89 9015 4591 6.23.0 6,1800 4,032,26 4156972 6oLA030.01 405722.14 5.12 516.05 MVA (3) 10152017 4:I2OSPM Pap 4 Annotation COMPASS 5000.14 Bull 85 ConocoPhillips 'la"'e' • C0flomwilllps Defndive Survey Report Cmnpeny: ConocoPbitlips(Alasb) Inc.-Kup2 Local Co-omidate Reference: Wall 3M-27 Prcq.m Kupmuk Ri., Unit TVD Reference: 3M-27 a 68,00usS(3M-27) SKe: Kup8fuk 3M Pad MO Reference: 351-27 Q 68.00usR(9M-27) Wall: W-27 North Reference: True WW9Mre: 3M-27 survey Calculation Method: Mlnlmum Curv9Wre D Iqn: W-27 Database: EDT Alaska Sandbox Sumy MD We TVD NDS) HUS DU lural P) (1) 19 luert) (sal) lural (raft) (MmI NOMM1q EacbnM Section Survey Tool Name Annotation Ip) IRI (-,low) (ft) 14,530.86 9101 4788 6,236 72 8.168.8 4,05287 3,3268 8020.650.84 495,1".14 712 5205 MVA (3) 14,560.13 90.83 48.80 626.24 6.168 24 4,072,70 -9,52535 8,024610.48 40676648 367 588ffi mm (3) 14,5Po.64 9252 4910 8.23537 6.16.37 4.092.16 3,502.6 6,020.68996 400913 0.28 59521 MM (3) 1462073 92,43 4800 8.234.07 61607 4.11173 4479.. 6,424109.55 496,e11 d3 tet 62147 MNO(3) 14,850.79 92M 47.45 6,23271 6671 4,13173 3,451.45 6,020,729.57 496831.31 527 611.92 MAD (3) 14.86.6 04.12 45.01 6.230.92 6.18292 4,15217 -9,435]8 6,020,750.02 496.855.90 66 614.54 MAD (3) 14.710.56 93M 4.67 6.22899 8,160.99 49351 4.4146 8420.711.38 498,81683 1054 70tH MM (3) 14,74060 92.00 40.36 GM7,61 9.159.61 410504 -9.394.98 6,020)83 .83 496.89814 0. 729.83 MM (3) 14,11049 9375 40.91 6,202.11 8.180.12 4,218. 4.375.52 8,02481640 493,916.19 814 75757 MWD (3) 14,00.81 W,71 4015 6Y23.34 6,15514 4,241.54 -936.80 8.020 ,83845 4W,93515 109 78584 MWO(3) 14,830.64 0" 4004 8.21904 0,151.04 4,281.12 -9336.80 6020.W2.01 46,954.14 1040 813.58 MAD (3) 14,606 89M HAI 621395 6,14596 42601 4,31824 0,020,8&.91 496,97338 5.37 84141 MAD (3) 14.606 806 3593 6,20880 6,14090 4,31058 3,300.34 6.@0909.53 49699125 8.16 6971 MWD (3) 14.02033 10032 32.86 6203.77 6.135J7 4334.71 -9,28382 8,M.M,67 487,00775 1040 88801 MWD (3) 14,W0.49 9988 20.96 8,19849 6.130.40 4.360.05 .,an 34 6.00 058.M 40702320 9.58 n'n MWD (3) 14984.6 80.88 2996 6191 W 6.123.03 4307.19 -9,246.91 602098516 4970".58 000 69.37 PROJECTED W TO f0i84l017 1'1206PM Pepe 5 COMPASS 500014 6ub085 RECEIVED, OCT 16 2017 AOGCC B AlUG ES AT U company To: Letter of Transmittal Date: October 16, 2017 '14 'oil d K BENDER Makana Bender AOGCC 333 West 711 Ave, Suite 100 Anchorage, Alaska 99501 From: Yosha Ragbirsingh / Michael Soper Baker Hughes, a GE Company 795 East 9411 Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3M -27A 3M-27AL1 3M-27AL2PB1 3M-27AL2 3M-27AL2-01 3M-27AL3 2A -22A 2A-22AL1 (8) Total prints 217-053 28680 217-054 28681 217-055 28682 217-055 28683 217-056 28684 217-057 28685 Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael.Soper@BHGE.com Yosha Ragbirsingh, Baker Hughes, Survey Manager Yosha.Ragbirsingh@BHGE.com ConocoPhillips RECEIVED OCT 16 2017 AQGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M -27A 50-029-22637-01 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 217-053 28680 BA, ICER UGHES C a GE company ConocoPhillips Company: ConocoPhillips (Alaska) Inc. -Kup2 Project Kuparuk River Unit Site: Kupamk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Project Kuparuk River Unit, North Slope Alaska, United Slates _...w_ Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: BA c6R UGHES Well 3M-27 1 3M-27 @ 68.001 (3M-27) + 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox 1 I r Mean Sea Level Using Well Reference Point Using geodetic scale factor i r 6,016,606.24usft Latitude: 70° 27'23.753 N l 506,294.30usfl Longitude: 149° 56'55.073 W i usft Ground Level: 0 00 usft Wellbore 3M -27A Magnetics Model Name Sample Date Declination Dip Angle Field Strength (I V) (nT) BGGM2017 7/1/2017 17.55 80.99 57,497 Design 3M-27A���_� Audit Notes: - Version: 1.0 Phase: ACTUAL Tie On Depth: 12,692.45 Vertical Section: Depth From (TVD) +Nl +E/ -W Direction (usft) (usft) (usft) (1) 68.00 0.00 0.00 20.00 Survey Program Date 9/25/2017 From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Data End Date 265.00 12,692.45 3M-27 (3M-27) MWD MWD -Standard 1/15/2001 12,712.50 12,746.03 3M -27A MWD-INC(3M-27A) MWD-INC_ONLY MWD-INC—ONLY—FILLER 8/18/2017 8/18/2017 12,77847 14,95049 3M -27A MWD(3M-27A) MWD MWD -Standard 8/18/2017 8/26/2017 10/6/2017 4:12.06PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 �y Project: Kuparuk River Unit TVD Reference: 3M-27 Q 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 Q 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey OU 0 10/62017 4,12:06PM Page 3 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi ND NDSS +N/ -S +E/ -W DLS (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting (°1100') Section Survey Tool Name Annotation (ft) (ft) (ft) 12,692.45 4126 281.03 6,195% 6,127.96 2,542.14 9,869.44 6,019,13979 496,423.70 1.00 -986.72 MWD -INC -ONLY (2) TIP 12,712.50 41.22 280.96 6,211.03 6,143.03 2,544.66 -9,882.42 6,019,142.30 496,410.72 0.29 -988.79 MWD -INC _ONLY (2) KOP 12,746.03 50.29 280.96 6,234.40 6,166.40 2,549.23 -9,905.98 6,019,146.84 496,387.16 2TN -992.55 MWD -INC _ONLY (2) Interpolated Azimuth 12,778.47 67,92 280.39 6,250.99 6,182.99 2,554.35 -9,933.23 6,019,151.94 496,359.91 54.37 -997.06 MWD (3) First Clean Survey 12,811.56 85.43 27396 6,256.60 6,190.60 2,558.29 9,965.04 6,019,155.85 496,328.10 56.16 -1,004.24 MM (3) 12,840.68 89.48 284.53 6,259.89 6,191.89 2,562.96 -9,993.71 6,019,160.50 496,299.43 38.83 -1,009.66 MWD (3) 12,870.95 9332 298.75 6,259.15 6,191.15 2,574.08 -10,021.76 6,019,171.60 496,271.37 48.64 -1,008.79 MWD (3) 12,903.80 93.56 318.55 6,257.16 6,189.16 2,594.46 -10,047.24 6,019,191.95 496,245.88 60.17 -998.36 MWD (3) 12,936.01 88% 335.71 6,255.56 6,188.56 2,621.40 -10,064.64 6,019,218.88 496,228.45 55.47 -979.00 MWD(3) 12,965.82 89.82 344.14 6,256.98 6,188.98 2,649.37 -10,074.86 6,019,246.84 496,218.21 28.59 -956.21 MWD (3) 12,995.69 90.18 345.19 6,256.98 6,188.98 2,678.18 -10,082.76 6019,27563 496,210.29 3.72 -931.84 MWD (3) 13,027.92 90.61 348.32 6,256.76 6,188.76 2,709.55 -10,090.15 6,019,306.99 496,202.88 9.80 -904.89 MWD (3) 13,054.91 91.78 349.75 6,256.20 6,188.20 2,73604 -10,095.28 6,019,33347 496,197.72 6.84 -881.76 MWD (3) 13,084.95 9126 352.31 6,255.40 6,187.40 2,765.70 -10,099.96 6,019,363.13 496,19302 869 -855.49 MWO(3) 13,119.77 90.83 355.32 6,254.76 6,186.76 2,800.30 -10,103.71 6,019,397.73 496,189.24 8.73 -824.25 MWD(3) 13,145.03 90.98 357.79 6,254.37 6,186.37 2,825.51 -10,105.23 6,019,422.93 496,187,70 9.80 -801.08 MM (3) 13,175.09 91.41 358.76 6,253.74 6,185.74 2,855.55 -10,106.13 6,019,452.97 496,186.77 3.53 -773.16 MWD (3) 13,204.79 90.98 0.95 6,253.12 6,185.12 2,885.24 -10,106.21 6,019,482.66 496,186.67 7.51 -745.28 MWD (3) 13.234.63 92.85 3.28 6,252.12 6,184.12 2,915.04 -10,105.11 6,019,512.45 496,187.74 10.01 -716.91 MWD (3) 13,265.93 92.73 5.33 6,250.60 6,182.60 2,946.22 -10,102.76 6,019,543.63 496,190.06 6.55 -686.81 MWD (3) 13,298.58 93.72 9.47 6,248.76 6,180.76 2,978.54 -10,098.56 6,019,575.95 496,194.23 13.02 -65500 MWD (3) 13,324.83 92.64 8.25 6,247.30 6,179.30 3,004.43 -10,094.53 6,019,601.84 496,198.25 6.20 -629.29 MWD (3) 13,358.22 93.47 10.89 6,245.52 6,177.52 3,037.31 -10,088.99 6,019,634.72 496,203.76 8.28 596.50 MWD(3) 13,390.12 90.00 10.82 6,244.56 6,176.56 3,06862 -10,082.98 6,019,666.03 496,209.74 10.88 -565.03 MWD (3) 13,419.27 87.48 8.69 6,245.20 6,177.20 3,097.34 -10,078.04 6,019,69475 496,214.65 11.32 536.35 MM (3) 13,45966 87.39 8.94 6,246.60 6,178.60 3,128.32 -10,073.24 6,019,725.74 49,219.43 0.85 505.59 MM (3) 13,480.43 88.10 11.33 6,247.78 6,179.78 3,157.60 -10,068.00 6,019,75502 496,22464 8.37 -476.28 MWD (3) 13,51077 88.77 12.33 6,248.61 6,180.61 3,187.29 -10,061.79 6,019,78471 496,230.83 3.97 -045.26 MWD (3) 13,540.92 89.82 14.40 6,248.98 6,180.98 3,216.62 -10,054.82 6,019,81404 496,237.77 7.70 416.32 MWD (3) 13,570.77 8969 1544 6,249.10 6,181.10 3,245.46 -10,047.13 6,019,842.89 49624543 3.51 -386.59 MM (3) 10/62017 4,12:06PM Page 3 COMPASS 5000.14 Build 85 ,all ConocoPhillips Azi ConocoPhillips Definitive Survey Report +NlS Company: ConocoPhillips (Alaska) Inc -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 310-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey MD Inc Azi TVD TVDSS +NlS +E7 -W Map Map LS Vertical (usft) (°) (°) (usft) (usft) (usft (usft) North Ea(Sfttjng ('1100.) S (ftt n Survey Tool Name (ft)ng 13600.62 89.82 16.95 6,249.23 6,18123 3,274.12 -10,038.81 6,019,871.55 496,25373 5.08 -356.80 MM (3) 13,630.70 89.26 18.58 6,249.47 6,181.47 3,302.]7 -10,029.63 6,019,900.20 496,262.88 573 -M.75 MWD (3) 13,650.72 89.51 20.31 6,249.80 6,181.80 3,331.07 -10,019.64 6,019,928.51 496,272.85 5.82 -296.73 MWD(3) 13,690.66 89.97 22.89 6,249.93 6,181.93 3,358.91 -10,008.62 6,019,956.36 496,283.85 8.75 -266.81 MWD (3) 13,720.81 91.04 25.75 6,249.67 6,181.67 3,386.38 -9,996.20 6,019,983.83 496,296.24 10.13 -236.75 MWD (3) 13,750.81 90.68 27.76 6,24921 6,18121 3,413.16 -9,982.70 6,020,010.63 496,303.72 6.81 -206.96 MWD (3) 13,780.78 89.51 28.75 6,249.17 6,181.17 3,439.56 -9,968.51 6,020,03703 496,323.88 5.11 -177.30 MWD (3) 13,810.85 88.59 29.96 6,249.66 6,18166 3,465.76 -9,953.77 6,020,06325 496,338.60 5.05 -147.64 MWD (3) 13840.75 87.30 30.10 6,250.74 6,182.74 3,491.63 -9,938.82 6,020,089.13 496,353.53 4.34 -118.21 MWD(3) 13,870.62 WAS 26.35 6,252.62 6,184.62 3,517.89 -9,924.72 6,020,11540 496,367.60 13.93 -88.72 MM (3) 13,900]0 86.47 24.16 6,254.73 6,186.73 3,545.03 -9,911.92 6,020,142.54 496,380.38 7.97 -58.84 MWD (3) 13,930.80 88,50 22.85 6,256.05 6,188.05 3,57260 -9,899.93 6,020,170.12 496,392.35 8.01 -28.83 MWD (3) 13,960.70 89.14 23.51 6,256.67 6,188.67 3,600.08 -9,888.16 6,020,197.61 496,404.09 3.05 1.02 MWD (3) 13,990.69 90.37 26.86 6,256.79 6,188.79 3,627.22 -9,875.40 6,020,224.75 496,416.83 11.90 30.88 MWD (3) 14,020.67 93.50 28.19 6,255.78 6,187.78 3,653]8 -9,861.56 6,020,251.33 496,430.65 11,34 60.58 MWD(3) 14,050.71 94.70 30.61 6,25363 6,185.63 3,679.89 -9,846.85 6,020,277.44 496,445.33 8.97 90.14 MWD(3) 14,080.70 95.35 31.85 6,251.01 6,183.01 3,705.43 -9,831.36 6,020,302.99 496,460.80 4.68 11944 MVID(3) 14110.71 96.37 34.29 6,247.94 6,179.94 3,73044 -9,815.07 6,020,32802 496,477.07 8.74 148.52 MM (3) 14,140.71 96.49 35.75 6,244.58 6,176.58 3,754.86 -9,797.96 6,020,352.44 496,494.15 485 177.31 MWD (3) 14,170.69 95.69 36.45 6,241.40 6,173.40 3,778.94 -9,760.40 6,020,376.54 496,511.69 3.54 205.95 MWD(3) 14,200.66 93.16 36.76 6,239.09 6,17109 3,802.93 -9,762.58 6,020,400.54 496,529.49 8.50 234.58 MWD(3) 14,230.82 91.23 37.01 6,237.93 6,169.93 3,827.03 -9,744.49 6,020,42466 496,547.55 6.45 26342 MWD (3) 14,262.07 90.00 37.43 6,237.60 6,169.60 3,851.92 -9,725.59 6,020,449.55 496,566.43 4.16 293.27 MWD (3) 14,290.80 89.94 37.87 6,237.61 6,169.61 3,874.66 -9,708.04 6,020,472.31 496,583.96 1.55 320.65 Mm (3) 14,320.86 89.48 38.73 6,237.77 6,169.77 3,898.25 -9,68941 6,020,495.92 496,602.57 324 349.18 MWD(3) 14,350.67 89.05 38.92 6,238.15 6,170.15 3,921.47 5,670.72 6,020,519.15 496,621.23 1.58 37740 MM (3) 14,38078 90.06 40.79 6,238.38 6,170.38 3,944.59 -9,651.43 6,020,542.28 496,640:51 7.06 40572 MWD (3) 14,410.78 90.86 40.91 6,238.14 6,170.14 3,967.28 -9,631.81 6,020,564.98 496,660.11 2.70 433.75 MWD(3) 14,440.74 90.95 43.21 6,237.67 6,169.67 3,989.52 -9,611.74 6,020,587.24 496,680.15 7.68 461.51 MWD (3) 14,470.77 90.67 4447 6,237.24 6,169.24 4,011.18 -9,59094 6,020,608.91 496,700.93 4.30 488.98 MW0(3) 14,500.69 90.15 45.91 6,237.03 6,169.03 4,032.26 -9,569.72 6,020,630.01 496,722.14 5.12 516.05 MWD(3) Annotation BAER DORES 10/62017 4:12:06PM Page 4 COMPASS 5000.14 Build 85 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (310-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox MD Inc ConocoPhillips Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 310-27 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (310-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox MD Inc TVD NDSS +N/-5 +E/ -W Map Map OLS Vertical (uaft) (•) (1) (°) (usR (usft) (ueft) (usft) Northing Easting Section) Survey Tool Name (ft) (R) (•1700.) (R) 14,530.86 91.01 47.88 6,236.72 6,168.72 4,052.87 -9,547.69 6,020,65064 496,744.14 7.12 542.95 MM (3) 14,560.73 90.83 48.96 6,236.24 6,168.24 4,072.70 -9,525.35 6,020,670.48 496,766.46 3.67 569.22 MWD (3) 14,590.64 92.52 49.78 6,235.37 6,167.37 4,092.16 -9,502.66 6,020,689.96 496,789.13 6.28 595.27 MM (3) 14,620.73 92.43 49.00 6,234.07 6,16607 4,111.73 -9,479.84 6,020,709.55 496,811.93 2.61 62147 MWD (3) 14,650.79 92.76 47,45 6,232.71 6,164.71 4,131.73 -9,45745 6,020,729.57 496,834.31 5.27 647.92 MWD (3) 14,68063 94.12 45.91 6,230.92 6,162.92 4,152.17 -9,435.78 6,020,75002 496,85596 6.88 674.54 MWD(3) 14,710.56 93.26 42.87 6,228.99 6,160.99 4,173.51 -9,414.89 6,020.771.38 496,876.83 10.54 701.74 MWD(3) 14,740.60 92.00 40.36 6,227.61 6,159.61 4,195.94 -9,394.96 6,020,793.83 496,896.74 9.34 729.63 MWD (3) 14,770.49 9315 40.91 6,226.11 6,158.12 4,218.60 -9,375.52 6,020,816.49 496,916.16 6.14 757.57 MWD (3) 14,800.81 96.74 40.15 6,223.34 6,155.34 4,241.54 -9,355.90 6,020,839.45 496,935.75 10.17 785.84 MWD (3) 14,83064 99.84 40.04 6,219.04 6,15164 4,264.12 -9,33689 6,020,862.04 496,95474 10.40 813.56 MWD (3) 14,860.58 99.76 38.41 6,213.95 6,145.95 4,286.97 -9,318.24 6,020,88491 496,973.38 5.37 84141 MM (3) 14,890.63 99.58 35.93 6,208.90 6,140.90 4,310.58 -9,300.34 6,020,908.53 496,991.25 8.16 869.71 MM (3) 14,920.33 100.32 32.86 6,203.77 6,135.77 4,334.71 -9,283,82 6,020,932.67 497,007.75 10.48 898.04 MWD (3) 14,950.49 99.86 29.96 6,19848 6,13048 4,360.05 -9,268.34 6,020,958.02 497,023.20 9.59 927.15 MWD (3) 14,994.00 99.86 29.% 6,191.03 6,123.03 4,397.19 -9,246.94 6,020,995.18 497,044.58 0.00 969.37 PROJECTEDwTD Annotation 108/2017 4: 12 06P Page 5 COMPASS 5000.14 Build 85 BA_ �. q %' PRINT DISTRIBUTION LIST UGHES a GE company COMPANY ConocoPhillips Alaska, In AM FIVE WELL NAME 3M -27A UCT 13 2017 FIELD Greater Kuparuk Area COUNTY North Slope Borough AQ7%.J %a LOG TYPE GR -RES BHI DISTRICT Alaska --- LOG DATE September 22, 2017 AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider�hes.com TODAYS DATE October 11, 2017 21 7053 26655 Please sign and return one copy of this transmittal form to: nocoPhillips Alaska, Inc. m Osterkamp (WNS Petroleum Technician) 700 G Street. DATA LOGGED 110/%312011 Anchorage, Alaska 99510 M.K. BENDER to acknowledge receipt of this data. Revision STATUS Final Replacement: No Details: COMPANY ADDRESS (FEDEX WILL WT DELVER TO P.O. BOX) PERSON ATTENTION V t BP North Slope. EOA, PBOC. PR&20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 Rev. Requested by: FIELD FINAL CD/DVD FINAL 1 PRELIM Attn: Makana Bender (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINI Ur MIN # OF COPIES 1# OF COPIES I# OF COPIES 2 ConocoPhillips Alaska Inc. 0 0 0 0 0 Attn: Tom Osterkamp ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska 0 0 0 0 0 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC 0 1 1 1 0 Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of0i1 & Gas *** 0 0 1 1 0 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6'. BP Exploration (Alaska) Inc. 0 1 1 1 0 Petrotechnical Data Center, LR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 2 3 3 0 ConocoPhillips OCT 13 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M -27A 50-029-22637-01 Baker Hughes INTEQ Definitive Survey Report 06 October. 2017 BAT UGHES a GE company 21 7053 28655 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 3M Pad MD Reference: Well: 3M-27 North Reference: Wellbore: 3M-27 Survey Calculation Method: Design: 3M-27 Database: Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) (usft) Map Zone: Alaska Zone 04 8/18/2017 Well 3M-27 Phase: ACTUAL Well Position -N/-S 0.00 usft Northing: 3M-27 (310-27) +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 310-27A (nT) Magnetics Model Name Sample Date Survey Program From (usft) 265.00 12,712.50 12,778.47 BGGM2017 7/1/2017 Design 3M -27A (usft) Audit Notes: 68.00 8/18/2017 Version: 1.0 Phase: ACTUAL Vertical Section: Survey (Wellbore) Depth From (TVD) Survey Program From (usft) 265.00 12,712.50 12,778.47 Well 3M-27 310-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Survey Start Date Using Well Reference Point 1/15/2001 (usft) Using geodetic scale factor 68.00 8/18/2017 Date 9/25/2017 To 70" 27'23.753 N (usft' Survey (Wellbore) 12,692.45 3M-27 (310-27) 12,746.03 3M -27A MWD -INC (3M -27A) 14,950.49 3M -27A MWD (3M -27A) Well 3M-27 310-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Survey Start Date Using Well Reference Point 1/15/2001 Using geodetic scale factor 8/18/2017 8/18/2017 6,016,606.24 usft Latitude: 70" 27'23.753 N 506,294.30usft Longitude: 149° 56'55.073 W usft Ground Level: 0.00 usft Declination Dip Angle Field Strength (1) 0 (nT) 17.55 80.99 57,497 Tie On Depth: 12.692.45 +N/ -S (usft) 0.00 Tool Name MWD MWD-INC_ONLY MWD +E/ -W (usft) 0.00 Description MWD - Standard MWD-INC_ONLY_FILLER MWD - Standard Direction (1) 20.00 Survey Survey Start Date End Date 1/15/2001 8/18/2017 8/18/2017 8/18/2017 8/26/2017 10/M2017 4:12: 06PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips BAf(ER + ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature ' Design: 3M-27 Database: EDT Alaska Sandbox Survey Map Map Vertical MD Inc An TVD NDSS -NI-S -E/.W Northing 9 Eastin 9 DLS Section (usft) (°) (°) (usft) (usk) (Usk) (usk) (°A00') Survey Tool Name Annotation (k) (k) (ft) 12,692.45 41.26 281.03 6,195.96 6,127.96 2,542.14 -9,869.44 6,019,139.79 496,423.70 1.00 586.72 MWD-INC _ONLY (2) TIP 12,712.50 41.22 280.96 6,211.03 6,143.03 2,544.66 -9,882.42 6,019,142.30 496,410.72 0.29 588.79 MM-INC-ONLY (2) KOP 12,746.03 50.29 280.96 6,234.40 6,166.40 2,549.23 -9,905.98 6,019,146.84 496,387.16 27.04 -992.55 MWD-INC _ONLY (2) Interpolated Azimuth 12,778.47 67.92 280.39 6,250.99 6,182.99 2,554.35 -9,933.23 6,019,151.94 496,359.91 54.37 -997.06 MWD (3) First Clean Survey i 12.811.56 85.43 273.96 6,258.60 6190.60 2,558.29 -9,965.04 6,019,155.85 496,328.10 56.16 -1,004.24 MWD (3) 12,840.68 89.48 284.53 6,259.69 6,191.89 2,562.% -9,993.71 6,019,160.50 496,299.43 38.83 -1,009.66 MWD (3) 12,870.95 93.32 298.75 6,259.15 6,191.15 2,574.08 -10,021.76 6,019,171.60 496,271.37 48.64 -1,008.79 MM (3) 12,903.80 93.56 318.55 6,257.16 6,189.16 2,594.46 -10,047.24 6,019,191.95 496,245.88 60.17 -9%.36 MM (3) 12,936.01 88.55 335.71 6,256.56 6,168.56 2.621.40 -10,03464 6,019,218.88 496,226.45 55.47 579.00 MWD(3) 12,965.82 89.82 344.14 6,256.98 6,188.98 2,649.37 -10,074.86 6,019,246.84 496,218.21 28.59 -956.21 MM (3) 12,995.69 90.18 345.19 6,256.98 6,188.98 2,678.1B -10,082.76 6,019,275.63 496,210.29 3.72 531.84 MWD (3) 13,027.92 90.61 346.32 6,256.76 6,188.76 2,709.55 -10,090.15 6,019,306.99 496,202.68 9.80 504.89 MM (3) 13,054.91 91.78 349.75 6,256.20 6,168.20 2,736.04 -10,095.28 6,019,333.47 496,197.72 6.84 -881.76 MWD (3) 13,084.95 91.26 352.31 6,255.40 6,187.40 2,765.70 -10,099.96 6,019,363.13 496,193.02 8.69 -855.49 MWD (3) 13.119.77 90.83 355.32 6,254.76 6,186.76 2,800.30 -10,103.71 6,019,397.73 496,189.24 873 -824.25 MM (3) 13,145.03 90.98 357.79 6,254.37 6,186.37 2,825.51 -10,105.23 6,019,422.93 496,187.70 9.80 -801.08 MM (3) 13,175.09 91.41 356.76 6,253.74 6,165.74 2,855.55 -10,106.13 6,019,452.97 496186.77 3.53 -773.16 MWD(3) 13,204.79 90.98 0.95 6,253.12 6,185.12 2,885.24 -10,106.21 6,019,482.66 496,186.67 7.51 -745.28 MWD (3) 13,234.63 92.85 3.28 6,252.12 6,184.12 2,915.04 -10,105.11 6,019,512.45 496,167.74 10.01 -716.91 MWD(3) 13,265.93 92.73 5.33 6,250.60 6,182.60 2,946.22 -10,102.76 6,019,54363 495,190.06 6.55 686.81 MM (3) 13,298.58 93.72 9.47 6,248.76 6,180.76 2,978.54 -10,098.56 6,019,575.95 496,194.23 13.02 -655.00 MWD (3) 13,324.83 92.64 8.25 6,247.30 6,179.30 3,004.43 -16094,53 6,019,601.84 496,198.25 6.20 629.29 MWD(3) 13,358.22 93.47 10.89 6.245.52 6,177.52 3,037.31 -10,088.99 6,019,634.72 496,203.76 8.28 S96.50 MWD (3) 13,390.12 90.00 10.82 6,244.56 6,176.56 3,068.62 -10,082.98 6,019,666.03 496,209.74 10.88 665.03 MWD(3) 13,419.27 87.48 8.69 6,245.20 6,177.20 3,097.34 -10,078.04 6,019,694.75 496,214.65 11.32 636.35 MM (3) . 13,450.66 87.39 8.94 6,246.60 6,176.60 3,128.32 -10,073.24 6,019,725.74 496,219.43 0.85 505.59 MWD (3) 13,480.43 88.10 11.33 6,247.78 6,179.78 3,157.60 -10,068.00 6,019,755.02 496,224,64 6.37 -476.28 MWD (3) 13,510.77 88.77 12.33 6,248.61 6,180.61 3,167.29 -10,061.79 6,019,784.71 4%,230.83 3.97 -046.26 MM (3) 13,540.92 89.82 14.40 6,248.98 6,180.98 3,216.62 -10,054.82 6,019,814.04 496,237.77 7.70 416.32 MWD (3) 13,570.77 89.69 15.44 6,249.10 6,181.10 3,245.46 -10,047.13 6,019,842.89 496,24543 3.51 386.59 MM (3) 101612017 4 12: 06PM Page 3 COMPASS 5000.14 Build 85 Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 31,1-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey "WtG E5 10/612017 4:12: 06PM Page 4 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/S +E/ -W Northing Eating DLS Section Survey Tool Name Annotation (usH) (°) (°) (usH) (usH) (usH) (usH) IHI (ft) ( ( °)1000 (ft) 13,600.62 89.82 16.95 6,249.23 6,181.23 3,274.12 -10,038.81 6,019,871.55 498253.73 5.08 -356.80 MWD(3) 13,630]0 89.26 18.58 6,249.47 6,181.47 3,302.77 -10,029.63 6,019,900.20 496,262.88 5.73 -326.75 MVJD(3) 13,660.72 89.51 20.31 6,249.80 6,181.80 3,331.07 -10,019.64 6,019,928.51 496,272.85 5.82 -2%.73 MVJD(3) 13,690.66 89.97 22.89 6249.93 6,181.93 3,358.91 -10,008.62 6,019,956.36 496.283.85 8.75 -266.81 MWD (3) 13,720.81 91.04 25.75 6,249.67 6,181.67 3,386.38 -9,996.20 6,019,983.63 496,296.24 10.13 -236.75 MWD(3) - 13,750.81 90.68 27.76 6,249.21 6,181.21 3,413.16 -9,982.70 6,020,010.63 496,309.72 6.81 -206.96 MWD (3) 13,78038 89.51 28.75 6,249.17 6,181.17 3,439.55 -9,968.51 6.020,037.03 496,323.88 5.11 -177.30 MWD (3) 13,810.85 88.59 29.% 6,249.66 6,181.66 3,465.76 -9,953.77 6,020,063.25 496,338.60 5.05 -147.64 MWD (3) 13,840.75 87.30 30.10 6,250.74 6,182.74 3,491.63 -9,938.82 6,020,089.13 498353.53 4.34 -118.21 MWD (3) 13,870.62 85.48 26.35 6,252.62 6,164.62 3,517.89 -9,924.72 6.020,115.40 496,36760 13.93 -88.72 MWD 13) 13900.70 86.47 24.16 6,254.73 6,186.73 3,545.03 -9,911.92 6,020.142.54 496,380.38 7.97 -58.84 MVVD(3) 13,930.80 88.50 22.85 6,256.05 6,188.05 3,572.60 -9,899.93 6,020,170.12 496,392.35 8.01 -28.83 Ill 13) 13,960.70 89.14 23.51 6,256.67 6,168.67 3,600.08 -9,888.16 6.020,197.61 498404.09 3.05 1.02 MWD(3) 13,990.69 90.37 26.86 6,256.79 6,188.79 3,627.22 -9,875.40 6,020,224.75 496,416.83 11.90 30.88 MM (3) 14,020.67 93.50 28.19 6.255.78 6,187.78 3,653.78 -9,861.56 6,020,251.33 496,430.65 11.34 60.68 MWD (3) 14,050.71 94.70 30.61 6,253.63 6,185.63 3,679.89 -9,846.85 6,020,277.44 496,4G.33 8.97 90.14 MWD (3) 14,080.70 95.35 31.86 6,251.01 6,183.01 3,705.43 -9,831.36 6,020,302.99 496.460.80 4.68 119.44 MWD (3) 14,110.71 96.37 34.29 6,247.94 6,179.94 3,730.44 -9,815.07 6,020,328.02 496,477.07 8.74 148.52 MVVD(3) 14,14071 96.49 35.75 6,249.58 6.176.58 3,754.86 -9,797.96 6,020,352.44 496.494.15 4.85 177.31 MWD (3) 14,170.69 95.69 36.45 6,241.40 6,173.40 3,778.94 -9,780.40 6,020,376.54 498511.69 3.54 205.95 MIND (3) 14200.66 93.16 36.76 6,239.09 6,171.09 3,802.93 -9,762.58 6,020,400.54 496,529.49 8.50 234.58 MWD(3) 14,230.82 91.23 37.01 6,237.93 6,169.93 3,827.03 -9,744.49 6,020,424.65 498547.55 6.45 263.42 MWD (3) 14,262.07 90.00 37.43 6,237.60 6,169.60 3,851.92 -9,725.59 6,020,449.55 496,566.43 4.16 293.27 MVVD (3) 14290.80 89.94 37.87 6,237.61 6,169.61 3,874.66 -9,708.04 6,020,472.31 498583.96 1.55 320.65 MWD (3) 14,320.86 89.48 38.73 6,237.77 6,169.77 3,898.25 -9,689.41 6,020,495.92 498602.57 3.24 349.18 MWD (3) 14,350.67 89.05 38.92 6,238.15 6,170.15 3,921.47 -9,670.72 6,020,519.15 498621.23 1.58 377.40 MM (3) 14,380.78 90.06 40.79 6,238.38 6,170.38 3,944.59 -9,651.43 6,020,542.28 496,640.51 7.06 405.72 MWD (3) 14,410.78 90.86 4091 6,238.14 6,170.14 3,967.28 -9,631.81 6,020,564.98 496,660.11 2.70 433.75 MWD (3) 14,440.74 90.95 43.21 6,237.67 6,169.67 3,989.52 -9,611.74 6,020,587.24 496.680.15 768 461.51 MM (3) 1447077 90.67 44.47 6,237.24 6,169.24 4,011.18 -9,590.94 6,020,608.91 496.700.93 AW 488.98 MWD(3) . 14,500.69 90.15 45.91 6,237.03 6,169.03 4,032.26 -9,569.72 6,020,630.01 496,722.14 5.12 516.05 MWD (3) "WtG E5 10/612017 4:12: 06PM Page 4 COMPASS 5000.14 Build 85 101612017 4: 12: 06PM Page 5 BAI-ER 40 UGHES Annotation COMPASS 5000.14 Build 85 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConoccPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well, 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design- 3M-27 Database: EDT Alaska Sandbox Survey Map Map Vertical MD Inc Azi TVD TVDSS «N/ -S •El -W Northing Easting DLS Section Survey Tool Name (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/WD') (ft) 14,530.86 91.01 47.88 6,236.72 6,168]2 4,052.87 -9,547.69 6,020,650.64 496,744.14 7.12 542.95 MM (3) 14,560.73 90.83 48.96 6236.24 6,168.24 4,072.70 -9,525.35 6,020,670.48 496,766.46 3.67 569.22 MAID (3) 14,590.64 92.52 49.78 6,235.37 6,167.37 4,092.16 -9,502.66 6,020,689.96 496,789.13 6.28 595.27 MM (3) 14,620.73 92.43 49.00 6,234.07 6,166.07 4,111.73 -9,479.84 6.020,709.55 496,811.93 2.61 621.47 MM (3) 14,650.79 92.76 47.45 6,232.71 6,164]1 4,131.73 -9,457.45 6,020.729.57 496,834.31 5.27 647.92 MWD (3) 14,680.63 94.12 45.91 6,230.92 6,162.92 4,152.17 -9,435.78 6,020,750.02 496,855.96 6.88 674.54 MWD (3) 14,710.56 93.26 42.87 6,228.99 6,160.99 4,173.51 -9.414.89 6,020,771.38 496,876.83 10.54 70174 MM (3) 14,740.60 92.00 40.36 6,227.61 6,159.61 4,195.94 -9,394.96 6,020,793.83 496,896.74 9.34 72963 MWD (3) 14,770.49 93.75 40.91 6,226.11 6,158.12 4,218.60 -9,375.52 6,020.816.49 496,916.16 6.14 757.57 MWD (3) 14800.81 96.74 40.15 6,223.39 6,155.34 4,241.54 -9,355,90 6,020,839.45 496,935.75 10.17 785.84 MM (3) 14.830.64 99.84 40.04 6.219.04 6.151.04 4,264.12 -9,336.89 6,020,862.04 496.954.74 10.40 813.56 MWD (3) 14,860.58 99.76 38.41 6,213.95 6,145.95 4,286.97 -9,318.24 6,020,864.91 496,973.38 5.37 841.41 MWD (3) 14.890.63 99.58 35.93 6,208.90 6,140.90 4,310.58 -9,300.34 6,020,908.53 496,991.25 8.16 869]1 MM (3) 14,920.33 100.32 32.86 6.203.77 6,135.77 4,334.71 -9,283.82 6,020,932.67 497,007]5 10.48 898.04 MWD(3) 14.950.49 99.66 29.96 6,198.48 6,130.48 4,360.05 -9,268.34 6,020,958.02 497,023.20 9.59 927.15 MWD (3) 14,994. DD 99.86 29.96 6,191.03 6,12303 4,397.19 -9,246.94 6,020,995.18 497, D44.58 0.00 969.37 PROJECTED to TD 101612017 4: 12: 06PM Page 5 BAI-ER 40 UGHES Annotation COMPASS 5000.14 Build 85 I THE STATE °fALASKA GOVERNOR BILL WALKER J. Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M -27A ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-053 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Surface Location: 892' FNL, 1574' FEL, Sec. 25, T13N, R8E, UM Bottomhole Location: 1584' FNL, 167' FEL, Sec. 22, T13N, R8E, UM Dear Mr. Ohlinger: Enclosed is the approved application for permit to re -drill the above referenced development well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this ZS day of April, 2017. STATE OF ALASKA A! A OIL AND GAS CONSERVATION COMB PERMIT TO DRILL 20 AAC 25.005 .� a �, v i.a ■ 7 V <i )N APR 11 2017 /40GC:G 1 a. Type of Work: Ilb. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill ❑ Lateral ❑ Stratigraphic Test ❑ Development - Oil El ` Service - WIN ❑ Single Zone ❑� Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑✓ , Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q - Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180. KRU 3M -27A r 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 15200' ' TVD: 6203' ' Kupamk River Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 892' FNL, 1574' FEL, Sec 25, T1 3N, RSE, U ADL 355032 q�� 5 01�.� Kuparuk River Oil Pool Top of Productive Horizon: 8. LandM Use Per t: 13. Approximate Spud Date: 3633' FNL, 904' FEL, Sec 22, T1 3N, R8E, UM ALK 3576 4/24/2017 9. Acres in Property: 1)014. Distance to Nearest Property: Total Depth: 1584' FNL, 167' FEL, Sec 22, T1 3N, RBE, UM -S1t1E� �� Za,0 2900' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 68' • 15. Distance to Nearest Well Open Surface: x- 506294 y- 6016606 Zone- 4 . GL Elevation above MSL (ft): 27' 1 to Same Pool: 2270', 3M-25 16. Deviated wells: Kickoff depth: 12725 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 95 degrees • Downhole: 4305 • Surface: 3684 ' 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 2050' 13150' 6255' 15200' 6203' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 13016' 6440' N/A 12926' 6372' 12907' Casing Length Size Cement Volume MD TVD Conductor 121' 16" 200 CF 121' 121' Surface 5928' 9-5/8" 1300 sx AS 111, 690 sx Class G 5996' 3465' Production 12938' 7" 200 sx Class G 13006' 6432' Perforation Depth MD (ft): 12696'- 12708', 12724' - 12744', Perforation Depth TVD (ft): 6198' - 6207', 6219' - 6234', 12764'- 12784' 6249'-6264' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program ❑✓ Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 requireme ❑4 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Keith Herring @ 263-4321 be deviated from without prior written approval. Contact Email Keith.E.Herring(cDcoD.com Printed Name J. Ohlinger Title Staff CTD Engineer y/W17 Signature Phone 265-1102 Date Commission Use Only Permit to Drill API Number:r1 Permit Approval See cover letter for other Number: -psi / 50-oo(, —463 0/'—rj� Date: _2r_ -T Irequirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane/ gas hydrates, or gas contained in shales: Other: B©p flit%� rC551//C t0 4,2020 P S 19 Samples req'd: Yes ❑�-�/ Now Mud log req'd: Yes E] No [2' f} rl n U/q v fl✓ t!$� 117 z SUO 0$S12S measures: Yes LId No[] Directional svy req'd: Yes L✓✓) No El �r�VBY1 Spacing caption req'd: Yes ❑ No Inclination -only svy req'd: Yes❑ Nou Post initial injection MIT req'd: Yes ❑ NoR' APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: L.71 q/1 U j �L_ ^V7111L���1//G�! /I 1 • Submit Form and Form 10-401 (Revised 11/2015) I fR1r@ivN,A4'months from the d approval (200 AAC 25.005(g)) Attachments in Duplicate V" �I IIVv„LL ,01� �//lf(17 ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 7, 2017 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: RECEIVED APR 11 2017 A1JG1aO ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill eight laterals out of the KRU 3M-27 (PTD# 195-214) using the coiled tubing drilling rig, Nabors CDR3-AC. ✓ CTD operations are scheduled to begin in May 2017. The objective will be to drill the 8 laterals KRU 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M-27AL4, 3M-27AL4-01, and 3M-27AL4-02 targeting the Kuparuk A and C -sands. I To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 - Detailed Summary of Operations - Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 - Current wellbore schematic - Proposed CTD schematic The application for sundry approval (10-403) for 3M-27 was approved on 3/16/2017. If you have any questions or require additional information, please contact me at 907-263-4321. ;;vSincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2))..................................................................................................................................................2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005 (c)(3)) ...................... ............................... .... ............... --..................................................... ..... .... ....... 2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4))......................................................................................................................... ........................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(5)) ......... .................................................................................... -................................................... 3 7. Diverter System Information..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7)). ................................................................... ........................ ................................................... 3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8))..................................................................................................................................................3 9. Abnormally Pressured Formation Information............................................................................. 4 (Requimments of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12)).................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations.................................................................................---............................................................4 LinerRunning...................................................................................................................................................................7 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 7 (Requirements of 20 AAC 25.005(c)(14)) ......... ........................................ -......................... .................................................................... 7 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))......................................................................................................................................................7 16. Attachments....................................................................................................................................8 Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02......................................8 Attachment 2: Current Well Schematic for 3M-27...........................................................................................................8 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02........................8 Page 1 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, Al -4-01, AI -4-02 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M- 27AL3, 3M-27AL4, 3M-27AL4-01, & 3M-27AL4-02. All laterals will be classified as "Development -Oil' wells. J 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A and C sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M- 27AL4, 3M-27AL4-01, & 3M-27AL4-02. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4 200 psi. Using the maximum formation pressure in the area of 4,305 psi in 3M-12 (i.e. 13.4 ppg EMW), the maximum potential surface pressure in 3M-27, assuming a gas gradient of 0.1 psi/ft, would be 3,684 psi! See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3M-27 was measured to be 3,591 psi (11.1 ppg EMW) on 9/5/2016. The maximum downhole pressure in the 3M-27 vicinity is to the southeast in the 3M-12 injector at 4,305 psi (13.4 ppg EMW) from August of 2016. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) None of the offset injection wells to 3M-27 have injected gas, so there is a low probability of encountering free gas while drilling the 3M-27 laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 3M-27 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 3M-27 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 8 April 7, 2016 PTD Application: 3M -27A, AL1 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details AL2 -01, AL3, AL4, AL4-01, AL4-02 Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 3M -27A 13150' 15200' 6187' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 121' 1640 630 Surface aluminum billet on to 3M-27AL1 13100' 15200' 6190' 6105' 2-3/8", 4.7#, L-80, ST -L slotted liner; 3465' 5750 3090 Production 7" aluminum billet on to 3M-27AL2 14130' 16200' 6127' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; 7240 5410 Tubing 3-1/2" 9.3 aluminum billet on to 3M-27AL2-01 12825' 16200' 6203' 6077' 2-3/8", 4.7#, L-80, ST -L slotted liner; 10540 aluminum billet on to 3M-27AL3 12775' 14375' 6186' 6163' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4 12825' 15200' 6203' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-01 12875' 16200' 6204' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-02 12583' 14375' 6046' 6167' 2-3/8", 4.7#, L-80, ST -L slotted liner; up into 3-1/2" tubing Existing Casing/Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psiPsi Collapse Conductor 16" 62.5 H-40 Welded 0' 121' 0' 121' 1640 630 Surface 9-5/8" 40.0 L-80 BTC 0' 5996' 0' 3465' 5750 3090 Production 7" 26.0 L-80 BTC -MOD 0' 13006' 0' 6432' 7240 5410 Tubing 3-1/2" 9.3 L-80 I EUE 0' 12598' 0' 6125' 1 10160 10540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based FloVis mud (8.6 ppg) — Drilling operations: Chloride -based FloVis mud (8.6 ppg)' This mud weight will not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and wellbore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled Page 3 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 3M-27 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 3M-27 Window (12725' MD, 6220' TVD) Usino MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 Pumps On 1.5 bpm) Pumps Off A/C -sand Formation Pressure 11.1 3591 psi 3591 psi Mud Hydrostatic 8.6 2782 si 2782 psi Annular friction i.e. ECD, 0.08psi/ft) 1018 psi 0 psi Mud + ECD Combined no chokepressure) 3800 psi overbalanced —209psi) 2782 psi underbalanced —809psi) Tar et BHP at Window 11.8 3817 psi 3817 psi Choke Pressure Required to Maintain Target BHP 17 psi 1035 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 The 3M -27A sidetrack will exit the cement pilot hole at 12725' MD and TD at 15200' MD, targeting the 1 Al sand to the north. It will be completed with 2-3/8" slotted liner from TD up to 13150'MD with an aluminum billet for kicking off the 3M-27AL1 lateral. The 3M-27AL1 lateral will drill to the north to a TD of 15200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 13100' MD with an aluminum billet for kicking off the 3M-27AL2 lateral. The 3M-27AL2 lateral will drill to the west to a TD of 16200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 14130' MD with an aluminum billet for kicking off the 3M-27AL2-01 lateral. The 3M-27AL2-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M -27A -L3 lateral. The 3M-27AL3 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12775' MD with an aluminum billet for kicking off the 3M-27AL4 lateral. The 3M-27AL4 lateral will drill to the north to a TD of 15200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL4-01 lateral. The 3M-27AL4-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12875' MD with an aluminum billet for kicking off the 3M-27AL4-02 lateral. The 3M-27AL4-02 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12583' MD. Pre -CTD Work 1. RU Slickline: Obtain SBHP, dummy off gas lift mandrels, and pressure test. 2. RU E -line: Punch 2' of holes in the 3-1/2" tubing tail at 12583' MD. 3. RU Pumping Unit: Perform injectivity test down the tubing. 4. RU Service Coil: Mill out "D" nipple and cement squeeze the A/C -sand perforations up to the holes in the tubing tail. 5. RU Slickline: Tag top of cement and pressure test cement. 6. Prep site for Nabors CDR3-AC rig and set BPV. Rie Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 3M -27A Sidetrack (Al sand - north) a. Mill 2.80" high -side pilot hole through the cement to 12755' MD. b. Caliper pilot hole. c. Settop of whipstock at 12725' MD. d. Mill 2.80" window at 12725' MD. e. Drill 3" bi-center lateral to TD of 15200' MD. f. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13150' MD. Page 5 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, ALZ-01, AL3, AL4, AL4-01, AL4-02 3. 3M-27AL1 Lateral (C4 sand - north) a. Kick off of the aluminum billet at 13150' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13100' MD. 4. 3M-27AL2 Lateral (C4 sand - west) a. Kickoff of the aluminum billet at 13100' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 14130' MD. 5. 3M-27AL2-01 Lateral (Al sand -west) a. Kickoff of the aluminum billet at 14130' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 6. 3M-27AL3 Lateral (Al sand- south) a. Kickoff of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12775' MD. 7. 3M-27AL4 Lateral (Al sand -north) a. Kick off of the aluminum billet at 12775' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 8. 3M-27AL4-01 Lateral (Al sand -west) a. Kickoff of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12875' MD. 9. 3M-27AL4-02 Lateral (Al sand - south) a. Kick off of the aluminum billet at 12875' MD. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 12583' MD. 10. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Pull BPV. 2. Obtain SBHP. 3. Install gas lift design. 4. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. Page 6 of 8 April 7, 2016 f PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AI -4-02 - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running - The 3M-27 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(6)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 3M -27A 2900' 3M-27AL1 2900' 3M-27AL2 900' 3M-27AL2-01 900' 3M-27AL3 3700' 3M-27AL4 2900' 3M-27AL4-01 900' 3M-27AL4-02 3700' Distance to Nearest Well within Pool Lateral Name Distance Well 3M -27A 2270' 3M-25 3M-27AL1 2270' 3M-25 Page 7 of 8 April 7, 2016 f PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 3M-27AL2 5065' 3M-25 3M-27AL2-01 5065' 3M-25 3M-27AL3 1508' 3M-23 3M-27AL4 2270' 3M-25 3M-27AL4-01 5065' 3M-25 3M-27AL4-02 1508' 3M-23 16. Attachments Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02laterals Attachment 2: Current Well Schematic for 3M-27 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Page 8 of 8 April 7, 2016 ConocoPhillips 0 0 0 0 0 3M-27 Project: Kuparuk River Unit Site: Kuparuk 3M Pad .^�.^ T�. x.m Mw�xt N. nsa• .WymiN FnM WELLBORE DETAILS: 3M -27A RE4ERENCF IxFORM4TION Parent Wellbore: 3M-27 Can6reb (NIEi Relefence: Well 3M47. Tme WM Well: 3M•37 '.Nr 57 20.,T Tle on MD: 12692.45 V.14 (TVD ReWe v3M-27 M ee.Wum P*271 Wellbore: 3M.27A Dm Mal. of Am Smc CVSI Rg.. SlM-(D ON, OWE) Plan: 3M•27A01 3M•27/3M-27A _w P ( j Dab.7xrzma Mvael. aDDMaofs Masaume D,ti U..: 3Ma7@66A eft PW271 Calculation MeaW Minh m L ufa West( -)/East(+) (650 us&/in) .'.. BAKER HUGHES 3M-27 Proposed CTD Schematic 16" 62# H-40 shoe (off 121' MD 9-5/8" 36# L-80 shoe @ 5996' MD C -sand perils 12,696' - 12,708' MD 12,724'- 12,744' MD IKOP @ 12,725' MD I IA -sand perfs 12,764' -12,784' MD 7" 26# L-80 shoe @ 13,006' MD 3-1/2" Camco DS Landing Nipple @ 495' MD (ID = 2.875") 3-1/2" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrel @ 3543', 6918', 97621,11,6661,12,378$ Baker CMU Sliding Sleeve @ 12,433'(2.813" ID X -profile) Baker 80-40 PBR @ 12,485' MD (4.00" ID) Baker FHL packer @ 12,498' MD (2.90" ID) X Nipple @ 12,515' MD (2.813" ID) Baker Po -Boy Overshot @ 12,533' MD Camco W Nipple @ 12,550' MD (2.812" ID) Baker PBR @ 12,558' MD (3.00" ID) Baker FHL packer @ 12,571' MD (3.0" ID) 3-1/2" Camco D nipple @ 12,588' MD (ID = 2.75") (Milled out to 2.80" ID for CTD) 3-1/2" tubing tail @ 12,597' MD 3M.27AL3 wp02 (Muth) TD ®14,375' MD Liner Billet Q 12,775' MD 3M-27AL4-01 wpoo (west) -_-�-- TD ®16,200' MD Liner 8111.1 12,875' MD 3M-21AL4-02 wp00 (south) TD®14,375'MD LinerT 12,583'MD 3M-27AL2-01 wp01 (west) TD 76,200' MD ,zzLiner Billet 12,825' MD 3M-27152 00' M (west) ZREg � TD 16,200' Me Liner eisel A 14 130' MD p 51 M-271AMi (north) TDLI 0VMD Liner Billet a 13,100'MD 310-27A wp07 (north) TO ®15,200' MD Liner Billet @ 13, 1W MD ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27 3M -27A Plan: 3M-27A_wp01 Standard Planning Report 03 April, 2017 rias BAKER HUGHES ConocoPhillips FRS ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc.-Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M -27A Design: 31\11-27A_Wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @J 68.00usft (3M-27) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kuparuk 3M Pad 3M-27 Site Position: Northing: 6,016,202.17usft Latitude: 70° 27' 19.780 N From: Map Easting: 506,126.99usft Longitude: 149° 56'59.998 W Position Uncertainty: 0.00 usft Slot Radius: 0,000in Grid Convergence: 0.05 ° Well 3M-27 Audit Notes: Well Position +NIS 0.00 usft Northing: 6,016,606.24 usft Latitude: 70` 27'23.753 N Depth From (TVD) +E/ -W 0.00 usft Easting: 506,294.30 usft Longitude: 149° 56'55+073 W Position Uncertainty +E/ -W 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3M -27A Magnetics Model Name Sample Data Declination Dip Angle Field Strength (°I (°) (nT) BGGM2016 7/1/2017 17.53 81.00 57,543 Design 3M -27A wp01 Audit Notes: Version: Phase: PLAN Tie On Depth: 12,692.45 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction Depth (usft) (usft) (usft) (°) +E/ -W 0.00 0.00 0.00 2000. Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/ -S +E/ -W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°1100ft) (°/10oft) (°1100ft) V) Target 12,692.45 41.26 281.03 6,127.96 2,542.14 -9,869.44 0.00 0.00 0.00 0.00 12,725.00 41.20 280.92 6,152.44 2,546.23 -9,890.51 0.29 -0.18 -0.34 -129.65 12,746.00 45.40 280.92 6,167.72 2,548.95 -9,904.64 20.00 20.00 0.00 0.00 12,845.11 90.00 280.92 6,204.38 2,565.89 -9,992.43 45.00 45.00 0.00 0.00 13,000.00 94.69 350.55 6,197.13 2,669.85 -10,093.99 45.00 3.03 44.95 85.00 13,200.00 92.15 4.34 6,185.16 2,868.79 -10,102.83 7.00 -1.27 6.90 100.00 13,500.00 90.57 25:29 6,177.96 3,157.11 -10,026.55 7.00 -0.52 6.98 94.00 13,700.00 90.55 11.29 6,175.99 3,346.53 -9,963.94 7.00 -0.01 -7.00 270.00 14,100.00 91.43 39.28 6,168.92 3,704.57 -9,794.83 7.00 0.22 7.00 88.00 14,250.00 91.77 28.78 6,164.73 3,828.65 -9,711.04 7.00 0.23 -7.00 272.00 14,500.00 91.39 46.28 6,157.79 4,026.06 -9,559.38 7.00 -0.15 7.00 91.00 14,800.00 91.29 25.28 6,150.69 4,268.00 -9,385.00 7.00 -0.03 -7.00 270.00 15,050.00 92.74 42.73 6,141.83 4,474.33 -9,245.83 7.00 0.58 6.98 85.00 15,200.00 92.69 32.22 6,134.71 4,593.07 -9,154.80 7.00 -0.03 -7.01 270.00 4/3/2017 2:40:54PM Page 2 COMPASS 5000.1 Build 74 i ConocoPhillips .��. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 3M-27 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad North Reference: True Well: 31V-27 Survey Calculation Method: Minimum Curvature Wellbore: 310-27A Northing Easting Design: 3M-27A_wp01 (°) (usft) Planned Survey Measured TVD Below Vertical Dogleg Tooftace Map Map Depth Inclination Azimuth System +N/ -S +E/ -W Section Rate Azimuth Northing Easting (usft) (I (°) (usft) (usft) (usft) (usft) (°/100ft) (°) (usft) (usft) 12,692.45 41.26 281.03 6,127,96 2,542.14 -9,869.44 -986.72 0.00 0.00 6,019,139.79 496,423.70 TIP 12,700.00 41.25 281.00 6,133.63 2,543.09 -9,874.33 -987.49 0.29 -129.65 6,019,140.74 496,418.81 12,725.00 41.20 280.92 6,152.44 2,546.23 -9,890.51 -990.08 0.29 -129.63 6,019,143.86 496,402.64 KOP 12,746.00 45.40 280.92 6,167.72 2,548.95 -9,904.64 -992.35 20.00 0.00 6,019,146.57 496,388.50 End 20 dls, Start 46 dls 12,800.00 69.70 280.92 6,196.47 2,557.52 -9,949.05 -999.49 45.00 0.00 6,019,155.10 496,344.09 12,845.11 90.00 280.92 6,204.38 2,565.89 -9,992.43 -1,006.46 45.00 0.00 6,019,163.43 496,300.71 4 12,900.00 92.09 305.54 6,203.37 2,587.36 -10,042.47 -1,003.40 45.00 85.00 6,019,184.86 496,250.65 13,000.00 94.69 350.55 6,197.13 2,669.85 -10,093.99 -943.51 45.00 85.46 6,019,267.29 496,199.07 End 46 dls, Start 7 dls 13,100.00 93.44 357.45 6,190.04 2,768.99 -10,104.40 -853.91 7.00 100.00 6,019,366.41 496,188.58 13,200.00 92.15 4.34 6,185.16 2,868.79 -10,102.83 -759.59 7.00 100.49 6,019,466.21 496,190.06 6 13,300.00 91.64 11.33 6,181.85 2,967.74 -10,089.21 -661.95 7.00 94.00 6,019,565.16 496,203.59 13,400.00 91.12 18.31 6,179.44 3,064.33 -10,063.66 -562.45 7.00 94.23 6,019,661.76 496,229.06 13,500.00 90.57 25.29 6,177.96 3,157.11 -10,026.55 -462.57 7.00 94.40 6,019,754.56 496,266.09 7 13,600.00 90.57 18.29 6,176.97 3,249.90 -9,989.45 -362.69 7.00 -90.00 6,019,847.38 496,303.10 13,700.00 90.55 11.29 6,175.99 3,346.53 -9,963.94 -263.16 7.00 -90.07 6,019,944.01 496,328.53 8 13,800.00 90.79 16.29 6,174.81 3,443.15 -9,938.44 -163.65 7.00 88.00 6,020,040.64 496,353.95 13,900.00 91.02 25.28 6,173.22 3,535.94 -9,901.36 -63.77 7.00 88.08 6,020,133.46 496,390.95 14,000.00 91.23 32.28 6,171.25 3,623.51 -9,853.25 34.98 7.00 88.19 6,020,221.06 496,438.98 14,100.00 91.43 39.28 6,168.92 3,704.57 -9,794.83 131.12 7.00 88.33 6,020,302.16 496,497.32 9 14,200.00 91.66 32.28 6,166.22 3,785.61 -9,736.42 227.26 7.00 -88.00 6,020,383.24 496,555.66 14,250.00 91.77 28.78 6,164.73 3,828.65 -9,711.04 276.39 7.00 -88.19 6,020,426.30 496,581.00 10 14,300.00 91.70 32.28 6,163.21 3,871.69 -9,685.65 325.51 7.00 91.00 6,020,469.36 496,606.35 14,400.00 91.56 39.28 6,160.36 3,952.73 -9,627.24 421.64 7.00 91.11 6,020,550.44 496,664.69 14,500.00 91.39 46.28 6,157.79 4,026.06 -9,559.38 513.75 7.00 91.31 6,020,623.82 496,732.48 11 14,600.00 91.38 39.28 6,155.37 4,099.38 -9,491.52 605.87 7.00 -90.00 6,020,697.19 496,800.27 14,700.00 91.35 32.28 6,153.00 4,180.43 -9,433.10 702.01 7.00 -90.17 6,020,778.28 496,858.61 14,800.00 91.29 25.28 6,150.69 4,268.00 -9,385.00 800.75 7.00 -90.34 6,020,865.89 496,906.63 12 14,900.00 91.89 32.26 6,147.90 4,355.57 -9,336.93 899.48 7.00 85.00 6,020,953.49 496,954.63 15,000.00 92.46 39.24 6,144.10 4,436.63 -9,278.59 995.60 7.00 85.19 6,021,034.58 497,012.89 15,050.00 92.74 42.73 6,141.83 4,474.33 -9,245.83 1,042.23 7.00 85.46 6,021,072.31 497,045.61 13 15,100.00 92.73 39.23 6,139.44 4,512.03 -9,213.09 1,088.86 7.00 -90.00 6,021,110.03 497,078.32 15,200.00 92.69 32.22 6,134.71 4,593.07 -9,154.80 1,184.95 7.00 -90.17 6,021,191.12 497,136.53 Planned TD at 16200.00 4!32017 2:40:54PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips Has ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well; 310-27 Wellbore: 3M -27A Design: 310-27A_wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (310-27) True Minimum Curvature Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape (1) (1) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 31V-27A_Fauttl 0.00 0.00 6,158.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 70° 13' 50.989 N 140° 47'43 316 W - plan misses target center by 1139551.88usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Polygon Point 6,158.00 0.00 0.00 6,020,114.00 1,636,574.00 Point 6,158.00 1.00 1.00 6,020,115.00 1,636,575.00 3M-27AL3_Fault2 0.00 0.00 6,188.00 629.171,129,993.58 6,018,190.00 1,636,174.00 70° 13'31900 N 140" 48'3.201 W - plan misses target center by 1139155.29usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Polygon Point 6,188.00 0.00 0.00 6,018,190.00 1,536,174.00 Point 6,188.00 1.00 1.00 6,018,191.00 1,636,175.00 3M-27AL3_Fault2_M 0.00 0.00 0.00 629.171,129,993.58 6,018,190.00 1,636,174.00 70' 13'32.900 N 140' 48'3.201 W - plan misses target center by 1139171.80usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Rectangle (sides W1,500.00111.00 D0.00) 3M-27A_T01 0.00 0.00 6,204.00 1,355.111,130,153.21 6,018,916.00 1,636,333.00 70° 13'39.714 N 140'47'55.467 W - plan misses target center by 1139312.62usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Point 3M-27A_T02 0.00 0.00 6,176.00 2,125.161,130,178.87 6,019,686.00 1,636,358.00 70" 13'47.153 N 140'47'51.384 W - plan misses target center by 1139336.34usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Point 3M-27 CTD Polygon Sot 0.00 0.00 0.00 10.631,129,376.00 6,017,571.00 1,635,557.00 - plan misses target center by 1138556.55usft at 15200.00usft MD (6134.71 TVD, 4593.07 N. -9154.80 E) Polygon Point 0.00 0.00 0.00 6,017,571.00 1,635,557.00 Point 0.00 1,549.65 635.29 6,019,121.03 1,636,190.92 Point 0.00 1,306.29 1,066.14 6,018,878.06 1,636,621.93 Point 0.00 388.33 899.40 6,017,960.05 1,636,455.98 Point 0.00 -90.36 437.97 6,017,481.02 1,635,995.00 Point 0.00 0.00 0.00 6,017,571.00 1,635,557.00 3M-27A_T04 0.00 0.00 6,135.00 3,381.601,130,990.01 6,020,943.00 1,637,168.00 - plan misses target center by 1140145.46usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Point 310-27 CTD Polygon We 0.00 0.00 0.00 4,589.101,128,180.75 6,022,148.00 1,634,358.00 - plan misses target center by 1137352.10usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Polygon Points 0.00 0.00 0.00 6,022,148.00 1,634,358.00 Point 0.00 -2,757.14 2,351.05 6,019,393.12 1,636,711.14 Point 0.00 -3,440.92 1,991.47 6,018,709.11 1,636,352.18 Point4 0.00 -2,499.35 1,383.16 6,019,650.07 1,635,743.13 Point 0.00 -436.73 -394.39 6,021,710.98 1,633,964.02 Point 0.00 0.00 0.00 6,022,148.00 1,634,358.00 70' 13'27.802 N 140" 48'23.598 W 70° 13'58.158 N 140' 47'22.650 W 70° 14' 14.017 N 140° 4B'37.999 W 3M-27AL3_Faultl 0.00 0.00 6,183.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70" 13'37.414 N 140° 48'0.963 W - plan misses target center by 1139161.15usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Polygon Point 6,183.00 0.00 0.00 6,018,656.00 1,636,181.00 Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 310-27A_T03 0.00 0.00 6,160.00 2,741.941,130,517.42 6,020,303.00 1,635,696.00 70° 13'52.643 N 140° 47'38.990 W - plan misses target center by 1139673.73usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Point 3M-27A_Faultl_M 0.00 0.00 0.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 70° 13'50.989 N 140° 47'43.316 W - plan misses target center by 1139568.39usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Rectangle (sides W1,500.00 H1.00 D0.00) 4/3/2017 2.40:54PM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips NAkI ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M -27A Design: 3M-27A_wp01 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature -plan misses target center by 1140424.99usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) Vertical - Polygon Hale Depth Depth Diameter Diameter Point 0.00 0.00 0.00 6,020,917.00 1,637,431,00 Point 0.00 -2,146.46 -952.80 6,018,769.95 1,636,480.11 Point 0.00 -1,769.89 -1,622.57 6,019,145.92 1,635,810.09 Point 0.00 328.43 -503.79 6,021,244.97 1,636,926.98 Points 0.00 0.00 0.00 6,020,917.00 1,637,431.00 3M-27AL3 Fauft7 M 0.00 0.00 0.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70° 13'37A14 N 140° 48'0,963 W -plan misses target center by 1139177.67usft at 15200.00usft MD (6134.71 TVD, 4593.07 N, -9154.80 E) - Rectangle (sides W1,500.00 H1.00 D0.00) Casing Points Measured Vertical Casing Hale Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 13,016.00 6,195.65 9 5/8" 9.625 12.250 15,200.00 6,134.71 23/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 12,692.45 6,127.96 2,542.14 -9,869.44 TIP 12,725.00 6,152.44 2,546.23 -9,890.51 KOP 12,746.00 6,167.72 2,548.95 -9,904.64 End 20 dls, Start 45 dls 12,845.11 6,204.38 2,565.89 -9,992.43 4 13,000.00 6,197.13 2,669.85 -10,093.99 End 45 dls, Start 7 dls 13,200.00 6,185.16 2,868.79 -10,102.83 6 13,500.00 6,177.96 3,157.11 -10,026.55 7 13,700.00 6,175.99 3,346.53 -9,963.94 8 14,100.00 6,168.92 3,704.57 -9,794.83 9 14,250.00 6,164.73 3,828.65 -9,711.04 10 14,500.00 6,157.79 4,026.06 -9,559.38 11 14,800.00 6,150.69 4,268.00 -9,385.00 12 15,050.00 6,141.83 4,474.33 -9,245.83 13 15,200.00 6,134.71 4,593.07 -9,154.80 Planned TD at 15200.00 4/32017 2:40 54P Page 5 COMPASS 5000.1 Build 74 Baker Hughes INTEQ .S.. ConoCoPhillips Travelling Cylinder Report BAKER HUGHES Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Reference Site: Kuparuk 3M Pad Site Error: 0.00 usft Reference Well: 3M-27 Well Error: 0.00 usft Reference Wellbore 3M -27A Reference Design: 310-27A_wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors: are at Database: Offset TVD Reference: Well 3M-27 3M-27 @ 6&00usft (310-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference 3M -27A wp01 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 12,692.45 to 15,200.00usft Scan Method: Tri Cylinder North Results Limited by: Maximum center -center distance of 1,713.20 usft Error Surface: Elliptical Conic Survey Tool Program Date 3/30/2017 From To (usft) (usft) Survey(Wellbore) Tool Name Description 265.00 12,692.45 310-27(310-27) MWD MWD - Standard 12,692.45 15,200.00 3M-27A_wp01 (3M -27A) MWD MWD -Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 13,016.00 6,263.85 95/8" 9-518 12-1/4 15,200.00 6,202.71 2 3/8" 2-3iS 3 Summary Kuparuk 3M Pad -3M -27 -3M -27-3M-27 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) installed (usft) Moet Toalfero♦ Kuparuk 3M Pad Centre Coain9- Centre to No Go Allowable Mining Depth 3M-23 - 3M-23 - 3M-23 Depth Depth AEimuth eW.S Out of range 3M -27 -3M -27-3M-27 12,725.00 12,725.00 0.00 3.63 -3.15 FAIL - Major Risk 310-27-3M-27AL7-3M-27AL1 wp01 13,174.99 13,175.00 0.59 0.86 -0.05 FAIL -Minor 1/10 3M-27-3M-27AL2-3M-27AL2_wp02 13,124.98 13,125.00 0.66 0.87 -0.06 FAIL -Minor 1/10 3M-27-3M-27AL2-01-3M-27AL2-01_wp01 13,124.98 13,125.00 0.66 0.87 -0.06 FAIL - Minor 1/10 3M-27-3M-27AL3-3M-27AL3_wp02 12,825.00 12,825.00 0.10 0.65 -0.55 FAIL - Minor 1/10 3M-27-3M-27AL4-3M-27AL4 wp00 12,975.00 12,975.00 0.00 3.15 -2.95 FAIL - Minor 1/10 3M-27-3M-27AL4-01-3M-27AL4-01_wp00 12,975.00 12,975.00 0.00 3.15 -2.96 FAIL - Minor 1/10 3M-27-3M-27AL4-02-3M-27AL4-02_wp00 12,875.00 12,875.00 0.00 2.49 -1.90 FAIL - Minor 1/10 Offset Design Kuparuk 3M Pad -3M -27 -3M -27-3M-27 ousel site Error: ewusft Survey Program: 25SMWD Rule Assigned: Major Risk Mast Well Error. amusft RMerents West Semi Major Axis Measured Venial Measured installed Reference Moet Toalfero♦ closer Wellbore Centre Coain9- Centre to No Go Allowable Mining Depth Depth Depth Depth AEimuth eW.S avm Role els centre DisUnae Deviation lural loan) hum) perim (usft) (am) P) lush) luso 1"I (use) Juan) hush) 12,700.00 6,201.63 12,700.00 5201.63 006 0,08 15401 2,54309 -9,874.33 10.15116 000 239 -2.11 FAIL - Major Risk, CC 12,725.00 6,220.44 12,725.00 6,220.44 0.19 0.33 154.00 2.546.23 -9,89051 10.15118 0.00 3.63 -3.15 FAIL- Major Risk, ES, SF 12.749.92 6,238,42 12,750.00 0,23925 0.33 0.58 10157 2,649.33 -9,90887 1015110 1.13 4.89 -0.00 FAIL � Major Risk 12,773.78 8,252.92 12]7500 8.258.08 048 0.84 10139 2.652.41 -9,922.82 10-15116 6.10 e20 376 Paas - Major Risk 12,79524 6,26274 12,800.00 6,276.93 ass 109 101.34 2,555.46 -9,938.97 10-15118 15.35 750 1268 Pass - Major Risk 12.81362 8,280.51 12,825.00 6,29578 0.77 I'M 10132 2,550.49 -9,955.10 10-15/16 25.13 8.73 25.15 Pass - Major Risk 12,830.00 8,27169 12,850.00 6,31485 0.90 1.60 101.33 2,561.48 -9.97172 1015116 43.67 991 40.47 Pass - Major Risk 12,841.55 6,272.33 12.875.00 6,333.54 0.99 185 101.34 2.58446 -9.987.33 10-15116 61.23 10.92 5788 Pass - Major Risk 42,855.59 6.272.34 12,900.00 6,352.42 1.10 2.10 1013.32 2,567.51 -1D.003.44 10-16118 8008 1198 7651 Pass - Major Risk 12,870.50 527216 12,925.00 6,371.26 122 235 114.19 2,570.75 -10,019.54 1015118 99.17 12.93 95.33 Pass - Major Risk Cr: - Mln 12 m.. to Center dikhmirP nr r meemerm nnlnt CF - min iPrwmfinn fnererr FC - min wllinep eanaratinn 3/30/2017 4:18:28PM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Project: KMparuk 3M P Unit Site: KMparuk 3M Pad Aommrmm rNe xonn xap eu. enm. ns• uae..u. n.a WELLBORE DETAILS: 3M -27A REFERENCE INFORMATION i ZERO Parent Wellbore' 3M-27 Coaidvmm lN[I ReMerm: weF3b27. Toe Noib Well: 3M-2] Wellbore: 3M -27A sierek 5Ia116n uo'm e(m• Te on MD:12692.45 Ve4d(IV01 Reto.. Wm Heeled sxmn rysl Rehnm: SM-(OMN.eME) BAKER Plan: 3M -27A wp01 (3W27MM-27A) Mmdw'e`e7e'F'.3m=i> Longitude M�uim OepN ReMxue: 3N21@aa.Weea13M2i) I■■■■■■■■■■■■.■■■■■, 6016606.24 506294.30 70e dN e N116E5 Mean 6401 600( 560( 520( 480( .5440( 400( 0 .7 360( 60( 20( 80( IIMMEMMEE WELL DETAILS: 3M-27 MEMO +N/ -S +E/ -W Northing Easting Latitude Longitude 0.00 0.00 I■■■■■■■■■■■■.■■■■■, 6016606.24 506294.30 70e 27'23.753 N 149° 56'55.073 W Sec MD Inc Azi TVDSS +N/ -S +E/ -W Dleg TFace VSecl Annotation 1 12692.45 41.26 281.03 6127.96 2542.14 -9869.44 0.00 0.00 -986.72 TIP 2 12725.00 41.20 280.92 6152,44 2546.23 -9890.51 0.29 -129.65 -990.08 KOP 3 12746.00 45.40 280.92 6167.72 2548.95 -9904.64 20.00 0.00 -992.35 End 20 cls, Start 45 dls 4 12845.11 90.00 280.92 6204.38 2565.89 -9992.43 45.00 0.00 -1006.46 4 5 13000.00 94.69 350.55 6197.13 2669.85 -10093.99 45.00 85.00 -943.51 End 45 d1s, Start 7 dls 6 13200.00 92.15 4.34 6185.16 2868.79-10102.83 6160 7.00 100.00 -759.59 6 7 13500.00 90.57 25.29 6177.96 3157.11-10026.55 7.00 94.00 -462.57 7 8 13700.00 90.55 11.29 6175.99 3346.53 -9963.94 7.00 270.00 -263.16 8 9 14100.00 91.43 39.28 6168.92 3704.57 -9794.83 7.00 88.00 131.12 9 10 14250.00 91.77 28.78 6164.73 3828.65 -9711.04 7.00 272.00 276.39 10 11 14500.00 91.39 46.28 6157.79 4026.06 -9559.38 7.00 91.00 513.75 11 12 14800.00 91.29 25.28 6150.69 4268.00 -9385.00 7.00 270.00 800.75 12 13 15050.00 92.74 42.73 6141.83 4474.33 -9245.83 7.00 85.00 1042.23 13 14 15200.00 92.69 32.22 6134.71 4593.07 -9154.80 7.00 270.00 1184.95 Planned TD at 15200.00 Mean 6401 600( 560( 520( 480( .5440( 400( 0 .7 360( 60( 20( 80( IIMMEMMEE West( -)/East(+) (400 usfl/in) MEMO ON I■■■■■■■■■■■■.■■■■■, 3M-2 /3M-7 AL4- I I 5880 oI II■MUMMA 3M- R/3M 7AL2 5950 ■■�� II■■MiN 3M.2 M-2 AL2 - 6020 ■■■■' m�■t !I■ERBIL'\\\®Mi TIP 6090 3M-2 cS M14-7AL4-�2 I KOP 3 -27/ ■MEN ■t End 0 ft. ten 45 ft 6160 `i°RJg, M at 152 0 6230 6 ] e 6300 od 45 IN,Sm t 7 d M -2T bt-]]r ME 6370 6440 No M-27 Fanl( "' O ea ME IN a ®®IM ORE�����\ INN 0 0 PAPENE M�� INN 0 HERD M�� SME MMMMM ...■ -14000-13600-1320P12800-12400.12000-11600-11200-10800-10400-10000-9600 -9200 -8800 -8400 A000 .7fi06 -11nn -exon 5740 West( -)/East(+) (400 usfl/in) 5810 _ 3M-2 /3M-7 AL4- I I 5880 oI a 3M- R/3M 7AL2 5950 3M.2 M-2 AL2 - 6020 3M ]IlM 7AL3 TIP 6090 3M-2 cS M14-7AL4-�2 I KOP 3 -27/ M-27 LI End 0 ft. ten 45 ft 6160 `i°RJg, M at 152 0.00 6230 6 ] e 6300 od 45 IN,Sm t 7 d M -2T bt-]]r I:I 6370 6440 M-27 Fanl( "' O ea ev�M Vertical Section at 20.00° (70 usft/in)-V •- a.� "� �.� I �:� --1- --���a TRANSMITTAL LETTER CHECKLIST WELL NAME: Xau' 3 /Y) - Z74 PTD: X } - 053 Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: glyLr POOL: L /12J 4ZJr 1� (AaA_fa Vhf �JJ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. API No. 50 - (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(1), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- — _) from records, data and logs acquired For well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Companv Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are fust caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Cpm panv Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(dx2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 A Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 WELL PERMIT CHECKLIST __ Well Name: KUPARUK RIV UNIT 3M -27A Program DEV Well bore seg ❑ PTD#:2170530 Company CONOCOPHILLIPS ALASKA INC--- Initial Class/Type __DE_V_/_PEND GeoArea 890. _ Unit 11160 _ On/Off Shore On _ _ Annular Disposal ❑ ADL0025523,.Surf Loc; ADL0025522, portion of well; ADL0355032, Top Prod & TD. KRU 3M -27A KUPARUK RIVER, KUPARUK RIV OIL - 490100, governed by Conservation Order No. 432D. CO 432D contains no spacing restrictions with respect to drilling unit boundaries. CO 432D has no interwell spacing restrictions. Wellbore will be more than 500' from an external property line where ownership or landownership changes. Conductor set. in KRU 3M-27 Surface casing set in 3M-27 Surface casing set and fully cemented Productive interval will be completed with slotted liner Rig has steel tanks; all waste to approved disposal wells. PTD 195-214,. Sundry 317-091 Anti -collision analysis complete; no major risk failures Max formation pressure is 4305 psig(13.4 ppg EMW ); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD MPSP is 3684 psig; will test BOPs to 4200 psig H2S measures required Wells on 3M -Pad are H2S-bearing. H2S measures required. Max. potential reservoir pressure is 13.4 ppg. EMW;. will be drilled using 8.6 ppg mud and MPD technique. Onshore development sidetrack to be drilled. Geologic Date: Engineering Date Public Date Commissioner: Commissioner: Com ' s' er yIZSIt-� 2 Lease number appropriate Yes 3 Unique well name and number Yes 4 Well located in defined pool Yes 5 Well located proper distance from drilling unit. boundary Yes 6 Well located proper distance from other wells Yes 7 Sufficient acreage available in drilling unit Yes 8 If deviated, is wellbore plat included Yes 9 Operator only affected party... _ Yes 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait Yes PKB 4/12/2017 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 17 Nonconven. gas conforms to AS31,05.030Q.1.A),(j.2.A-D) NA 18 Conductor string. provided NA Engineering 19 Surface casing protects all known USDWs NA 20 CMT vol adequate to circulate on conductor & surf csg NA 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons _ _ No 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate. tankage or reserve pit Yes 25 If a re -drill, has a 10-403 for abandonment been approved Yes 26 Adequate wellbore separation proposed Yes 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling fluid program schematic & equip list adequate Yes VTL 4/21/2017 29 BOPEs,. do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes 31 Choke manifold complies w/API. RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable Yes 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures No Geology 36 Data. presented on potential overpressure zones Yes Appr Dale 37 Seismic. analysis of shallow gas zones NA PKB 4/12/2017 38 Seabed condition survey (if off -shore) NA. 39 Contact name/phone for weekly progress reports [exploratory only) NA ADL0025523,.Surf Loc; ADL0025522, portion of well; ADL0355032, Top Prod & TD. KRU 3M -27A KUPARUK RIVER, KUPARUK RIV OIL - 490100, governed by Conservation Order No. 432D. CO 432D contains no spacing restrictions with respect to drilling unit boundaries. CO 432D has no interwell spacing restrictions. Wellbore will be more than 500' from an external property line where ownership or landownership changes. Conductor set. in KRU 3M-27 Surface casing set in 3M-27 Surface casing set and fully cemented Productive interval will be completed with slotted liner Rig has steel tanks; all waste to approved disposal wells. PTD 195-214,. Sundry 317-091 Anti -collision analysis complete; no major risk failures Max formation pressure is 4305 psig(13.4 ppg EMW ); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD MPSP is 3684 psig; will test BOPs to 4200 psig H2S measures required Wells on 3M -Pad are H2S-bearing. H2S measures required. Max. potential reservoir pressure is 13.4 ppg. EMW;. will be drilled using 8.6 ppg mud and MPD technique. Onshore development sidetrack to be drilled. Geologic Date: Engineering Date Public Date Commissioner: Commissioner: Com ' s' er yIZSIt-�