Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
217-056
DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170560 Well Name/No. KUPARUK RIV UNIT 3M-27AL2-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-62-00 MD 15380 TVD 6194 Completion Date 9/23/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log Nv✓ Samples No ✓ Directional Survey Yes✓ DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Etectr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 28659 Digital Data 12580 15380 10/13/2017 Electronic Data Set, Filename: 3M-27AL2-01 GAMMA RES.Ias ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 21VID Final.cgm ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 51VID Final.cgm ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 5TVDSS Final.cgm , ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 21VID Final.pdf ED C 28659 Digital Data V1011312017 Electronic File: 3H-27AL2-01 SMD Final.pdf ED C 28659 Digital Data P1 011 3/2 0 1 7 Electronic File: 3H-27AL2-01 5TVDSS Final.pdf ' ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01 EOW - NAD27.pdf- ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01 EOW - NA027.txt' ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01 Final Surveys TO 15380.csv ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01 Final Surveys TD' 15380.xlsx ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01 Survey Listing.txt• ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01 Surveys.txt, ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2- 01 _25_tapescan_BHI CTK.txt. ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2- 01 _5_tapescan_BHI_CTK.txt - ED C 28659 Digital Data 10/13/2017 Electronic File: 3M-27AL2-01_output.tap ' ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 21VID Final.tif ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 51VID Final.tif . AOGCC Page] of 2 Thursday, December 28, 2017 DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170560 Well Name/No. KUPARUK RIV UNIT 3M-27AL2-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029-22637-62-00 MD 15380 TVD 6194 Completion Date 9/23/2017 Completion Status 1-0I1- Current Status 1 -OIL UIC No ED C 28659 Digital Data 10/13/2017 Electronic File: 3H-27AL2-01 5TVDSS Final.tif , Log C 28659 Log Header Scans 0 0 2170560 KUPARUK RIV UNIT 3M-27AL2-01 LOG HEADERS ED C 28684 Digital Data 10/16/2017 Electronic File: 3M-27AL2-01 EOW - NAD27.pdf ED C 28684 Digital Data 10/16/2017 Electronic File: 3M-27AL2-01 EOW - NAD27.txt - Log C 28684 Log Header Scans 0 0 2170560 KUPARUK RIV UNIT 3M-27AL2-01 LOG HEADERS Well Cores/Samples Information: - Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Y Directional / Inclination Data YQ Production Test Informatio Y NA Mechanical Integrity Test Information Y -Q Geologic Markers/Tops Daily Operations Summary l.Y COMPLIANCE HISTORY Completion Date: 9/23/2017 Release Date: 4/25/2017 Description Comments: Compliance Date Comments Mud Logs, Image Files, Digital Data //YY`-`/ 1�F r6 Core Chips Y Composite Logs, Image, Data Files OY Core Photographs Y Cuttings Samples Y/10 Laboratory Analyses Y Date: AOGCC Page 2 of 2 Thursday, December 28, 2017 I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: CIE, Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Q • Exploratory ❑ GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions: Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: ConocoPhrllips Alaska, Inc. Abend.: 9/23/2017 217-056 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 100360 Anchorage, AK 99510-0360 9/9/2017 50-029.22637.62-00 4a. Location of Well (Governmental Section): Surface: 892' FNL, 1574' FEL, Sec 25, T13N, R8E, UM 8. Date TO Reached: / CI RLIN201r -lllzf/t{ 16. Well Name and Number: KRU 3M-27AL2-01 . Top of Productive Interval: 9. Ref Elevations: KB: 68 17. Field / Pool(s): 3174' FNL, 1135' FEL, Sec 22, T1 3N, R8E, UM GL: 27 BF: Kuparuk River Field/Kuparuk Oil Pool Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 1599' FNL, 2342' FEL, Sec 22, T1 3N, R8E, UM N/A ADL 25523, ADL 355032, ADL 25522 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 506294 y- 6016605 Zone- 4 1538076194' , 931813000 TPI: x- 496170 y- 6019602 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- 494962 y- 6021178 Zone- 4 N/A 1795/1725 5. Directional or Inclination Survey: Yes L� (attached) 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 13327'/6232' 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days 'al, of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited tens gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, s 1 , I r, d ECI r, perforation perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res OCT 2 p 2017 23. CASING, LINER AND CEMENTING RECORD WT. PER CASING FT SETTING DEPTH MD SETTING DEPTH TVD GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16" 62.58 H-40 Surf 121' Surf 121' 24" 200 CF 9.625" 40 L-80 Surf 5996' Surf 3465' 1225" 1300 sx AS III Lead, 690 sx Class G Tail 7" 26 L-80 Surf 13006' Surf 6432' 8.5" 200 sx Class G 2-3/8" 4.7 L-80 12818' 15380' 6259' 6194' 3" Slotted Liner 24. Open to production or injection? Yes Q No ❑ 25. TUBING RECORD If Yes, list each interval open (MDlrVD of Top and Bottom; Perforation SIZE DEPTH SET (MD) PACKER SET (MDfrVD) Size and Number; Date Perfd): 3-1/2" 12598' 12498 MD/6052 TVD 12571 MD/6105 TVD 12818'-15380' MD / 6259'-6194' TVD Slotted Liner 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes El No Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): 9/24/2017 Gas Lift Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size. Gas -Oil Ratio: 10/2/2017 6.8 Test Period 1070 594 521 173 555 Flow Tubing Casing Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravitv - API (corr): Press. 263 1315 24 -Hour Rate -10, 3778 2098 1838 20 Form 10407 Revised 512017 CONTINUED ON PAGE 2 't f , r r,, .,7 Submit ORIGINAL only fltil' to/301/? �'!�z6�7 Ri'Di-RS L (? . & 28. CORE DATA Conventional Corals): Yes ❑ No 0 Sidewall Cores: Yes ❑ No 0 If Yes, list formations and intervals cored (MDlrVD, From/ro), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1795 1725 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 13327 6232 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kupark C TD 15380 6194 (Kuparuk C Sand) Formation at total depth: Kuparuk C 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematics Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: J. Ohlinger Contact Name: Keith Herring /11010117 Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herring@cop.com Authorized Contact Phone: 263-4321 a/ `r Signature: Date: INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10.407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item ta: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3M-27 Final CTD Schematic 121' MD 9-5/8" 36# L-80 shoe @ 59%' MD C -sand perfs 12,6961- 12,708'MD 12,724' -12,744' MD A -sand perfs 12,764' -12,784' MD 7" 26# L -Bo shoe @ 13,006' MD 3-1/2" Camco DS Landing Nipple @ 495' RKB (ID = 2.875") 3-1/7' 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrel @ 3543', 6918', 9762',11.666', 12,378' RKB Baker CMU Sliding Sleeve @ 12,433' RKB (2.813"11) X -profile) Baker 80-40 PBR @ 12,485' RKB (4.00" ID) Baker FHL packer @ 12,498' RKB (2.90" ID) X Nipple @ 12,515' RKB (2.813" ID) (12504' PDC) Baker Po -Boy Overshot @ 12,533' RKB (12522' PDC) Camco W Nipple @ 12,550' RKB (2.812" ID) (12539' PDC) Baker PBR @ 12,558' RKB (3.09'[D) Baker FHL packer @ 12,571' RKB (3.0" ID) (12560' PDC) 3-1/7' Csmco D nipple @ 12,588' RKB (12577 PDC) (Milled out to 2.80" ID) 3-112" tubing tail @ 12,598' RKB (12587' PDC) U-3 TD=14427' MD do8ed liner 1W deployment sleavo 12558' MD, BOL =14.127' MD = water soluble tracer pups = oil soluble tracer pups 31144FTAU41 TD =15387 MD 2J/ unfled Frcr w/ anchored aluminum oft TOL =12817 MD, BOL =15387 MD Od Tracer at 152W MD (SN: T-747) Water Tmmr at 1527T MD (SN: T-912) 'MD, BOL =14994' MD 14844' MD (SN:T-165F) at 1483T MD (SN: T-940) L= 13327' MD, 801= Tracer at 15206' MD(. ter Trecer at 15202 M 13416 MD =13480' MD slotted mar w7 aluminum bdlet 13157 MD, BOIL =14882' MD Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log 1 Start Depth Start Time rod Time Da(hr) Phase Op Code Activity Code Time P-T.X Operation (WE) File Depth(MKa) 8/5/2017 8/5/2017 3.00 MIRU MOVE MOB P Trucks on location, PJSM w/crews, 0.0 0.0 18:00 21:00 follow pre -move check list, pull pit module away from ddling Sub, pull drilling Sub off of well, install jeeps, load shop onto 12' wide trailer. 8/5/2017 8/5/2017 2.25 MIRU MOVE MOB P Start moving to 3M -pad crossing over 0.0 0.0 21:00 23:15 rig mats 8/5/2017 8/6/2017 0.75 MIRU MOVE MOB P On 3M -pad, remove jeeps, prep well 0.0 0.0 23:15 00:00 for rig. 8/6/2017 8/6/2017 4.00 MIRU MOVE MOB P Spot modules over well 27, retrieve 0.0 0.0 00:00 04:00 shop and halfway house. 8/6/2017 8/6/2017 2.00 MIRU WHDSOP RURD P Follow post move check Isit, setting 0.0 0.0 04:00 06:00 stairs, spotting in dumpsters, hooking up PUTZ 8/6/2017 8/6/2017 2.50 MIRU WHDBOP NUND P Nipple up BOPE's, fuesable istalled, 0.0 0.0 06:00 08:30 .called CPF3 Board, COMMS up after 07:00, prep for BOP test, working on MP #2 replacing pulsation dampener 8/6/2017 8/6/2017 1.50 MIRU WHDBOP NUND P PJSM, fluid pack lines, BOP shell test, 0.0 0.0 08:30 10:00 C/O leaking O-ring riser, repeat shell test to 4200 psi, passed. Rig Accepted 09:00 hour"• 8/6/2017 8/6/2017 9.00 MIRU WHDBOP BOPE P Begin BOPE test, witness waived by 0.0 0.0 10:00 19:00 Chuck Scheve, test 10, greased B4 & 8, retested, found bleeder 4leaking since beginning of test (not part of WC, will need replaces), greased R3 was fail/pass. Test IRV iron, leaking near pressure bulkhead, LOTO reel to troubleshoot IR iron 8/6/2017 8/6/2017 1.50 SLOT WELLPR MILL P PT PDL's and tiger tank line, aim -ops, 0.0 0.0 19:00 20:30 remove bulkhead, repair failed o -ring, re -install bulkhead. 8/6/2017 8/6/2017 2.00 SLOT WELLPR MILL P Valve crew on location, load 0.0 0.0 20:30 22:30 equipment, MU extenlions, PT lubricator, pull BPV 8/6/2017 8/6/2017 1.00 SLOT WELLPR MILL P Retest and chart inner reel iron, good 0.0 0.0 22:30 23:30 test 8/6/2017 8/7/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU BHA# 1 0.0 62.4 23:30 00:00 8f7/2017 8/7/2017 0.75 SLOT WELLPR MILL T Finish MU milling BHA# 1, with turned 62.4 62.4 00:00 00:45 down bi-center bit 2.98", surface test tools, stab INJH 817/2017 8/7/2017 1.75 SLOT WELLPR MILL T RIH, taking freeze protect returns out 62.4 9,098.0 00:45 02:30 side to tiget tank. 817/2017 8/7/2017 1.00 SLOT WELLPR MILL T Set down 21k CTSW, PUH circulate 9,098.0 7,940.0 02:30 03:30 milling fluid around, re -boot BHI computers, PUH for Tie In. 8/7/2017 8/7/2017 0.55 SLOT WELLPR MILL T Log formation for tie in/depth control 7,940.0 8,042.0 03:30 04:03 plus 18.0' 8/7/2017 817/2017 0.20 SLOT WELLPR MILL T RIH, 8,042.0 9,030.0 04:03 04:15 8/7/2017 8/7/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 2.0' 9,030.0 9,068.0 04:15 04:30 1 I I Page 1/51 Report Printed: 912712017 Operations Summary (with Timelog L)epths) Dil 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tim® Log Stan Depth StaM1rma End Tim Dw IN) Please Op Code A Vily code Tim P -TX Operation (MKB) End Depth(IIKB) 8/7/2017 8/7/2017 3.00 SLOT WELLPR MILL T Dry Tag TOC @ 9117', PUW 33.5 k. 9,068.0 9,117.0 04:30 07:30 Bring pump up 1.5 bpm at 2315 psi FS, BHP 2389, WHIP 0, IA 0, OA 338. Mulitple stalls trying to get a pattern started. Mixed and pumped 50 bbl pill w/ 2.5% Safe Lube. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Safe lube at bit, 9116.95', 1.8 bpm, 9,117.0 9,117.0 07:30 08:30 2926 psi CP, (2650 psi FS, 300 psi motor work), First time able to stay on it w/out stalling, made 1 foot on Autodriller w/ 0.21K WOB, to 9118', increased WOB after 1 ft and stalled. PU 33K 8/7/2017 8/7/2017 2.80 SLOT WELLPR MILL T Unable to get mill started. Confer with 9,117.0 9,119.0 08:30 11:18 Town, tried recommended break-in procedure at low pump rate, 1.2 bpm. Tried holding in motor stall longer (per town), Spud in multiple times at 15 FPM, pumps ontoff. 8/7/2017 817/2017 3.50 SLOT WELLPR MILL T Send Pill w/ 0.5 ppb beads, open 9,119.0 9,122.9 11:18 14:48 EDC, circulate down closer to bit, Gose EDC. After multiple stalls, able to stay on it at 1.8 bpm, 2980 CP, 80 to 100 psi motor work, 0.21K WOB, send second 25 bbl bead pill 817/2017 8/7/2017 1.70 SLOT WELLPR MILL T Decision from town to POOH for 9,122.9 62.4 14:48 16:30 different MHA 8/7/2017 8/7/2017 1.50 SLOT WELLPR MILL T At surface, OW WFF, hold PJSM, lay 0.0 62.3 16:30 18:00 down HYC 2.98" bi-center bit and Baker motor, PU HYC 2.73" SD408 Non bi-center PDC bit and new motor 8/7/2017 8/7/2017 1.80 SLOT WELLPR MILL T RIH 62.3 9,060.0 18:00 19:48 8/7/2017 8/7/2017 0.30 SLOT WELLPR MILL T Log tie in from 9000'to 9060, continue 9,050.0 9,124.0 19:48 20:06 RIH 8/7/2017 8/7/2017 2.00 SLOT WELLPR MILL T Dry tag at 9124, PU 33K. Establish 9,124.0 9,141.6- 20:06 22:06 FS parameters at 1.2 bpm, 1775 psi CP, 0 WHIP, 2356 psi BHP, 164 psi dP. Stall 2X creeping in at 8 FPH. PU, establish FS parameters at 1.5 bpm, 2306 psi CP, 0 WHIP, 2400 psi BHP, 221 psi dP, able to gel WOB w/out stall, mill cement 8/7/2017 818/2017 1.90 SLOT WELLPR MILL T OBM, 1.78 bpm at 2,938 psi FS, BHP 9,141.0 9,168.0 22:06 00:00 1 2,485, WHIP 0, IA 0, OA 502 8/8/2017 8/8/2017 2.30 SLOT WELLPR MILL T OBM, 1.79 bpm at 3,025 psi, BHP 9,168.0 9,195.0 00:00 02:18 2,491. WHIP 0, IA 0, OA 508, CTSW=5.6 k, DHWOB=1.7-2.0 k, ROP 30 fph 8/8/2017 8/6/2017 0.25 SLOT WELLPR MILL T Annular and bore pressure increased, 9,195.0 8,700.0 02:18 02:33 PUH 34 k, pulled 50 k at 9,155'. continued wiper above cement. 8/8/2017 8/8/2017 3.75 SLOT WELLPR MILL T RBIH, setting down at 9,167', - 8,700.0 9,195.0 02:33 06:18 9,162',9,158', 9,144', work back to bottom (16 stalls since midnight), 1.75 bpm at 2,894 psi FS, BHP 2,572, WHIP 0, IA 0, OA 527 Page 2151 Report Printed: 9127/2017 Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stun Depth Sian Time End rima our (hr) Phase op Code a fty Code Time P -TX openab n (fIKB). End Depth p KB) 8/8/2017 8/8/2017 2.20 SLOT WELLPR MILL T BOBM, 1.83 bpm at 3,200 psi, BHP 9,195.0 9,212.0 86:18 08:30 2,635, WHIP 0, IA 0, OA 531, CTSW=6 k, DHWOB=1.8 k, ROP 22-30 fph. Pump 5x5 sweeps, for hole cleaning. 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T PUH, PUW 51 k, DHWOB -12 k, Pull 9,212.0 62.3 08:30 10:00 free, continue PUH, open EDC, POOH pumping 2.2 bpm at 2,806 psi, chasing sweep to surface. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 62.3 62.3 10:00 10:30 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T LD Milling BHA# 2 62.3 0.0 10:30 11:00 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T WO Weatherford tools to arrive 0.0 0.0 11:00 11:30 location. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU Reaves Underreamer, 0.0 83.7 11:30 12:00 WFT Motor, Dual Acting Jars, 2.73" Stabilizer over dead well 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T Tag up, reset counters. RIH, circulate 83.7 9,050.0 12:00 13:30 minimum rate. 8/8/2017 8/8/2017 0.35 SLOT WELLPR MILL T Log formation correction plus 12.0', 9,050.0 9,091.0 13:30 13:51 PUW 36 k 8/8/2017 8/8/2017 0.40 SLOT WELLPR MILL T PUH to underream, close EDC 9,091.0 8,000.0 13:51 14:15 8/8/2017 8/8/2017 4.00 SLOT WELLPR MILL T Bring pump up to 1.6 bpm at 3,422 8,000.0 . 9,141.0 14:15 18:15 psi, BHP 2,225, WHIP 0. IA 0, OA 429, RIH at 20 fpm, CTSW=11 k, DHWOS=0 8/8/2017 8/8/2017 0.90 SLOT WELLPR MILL T Motor work increase, stalled, PUH, 9,141.0 9,075.0 18:15 19:09 difficutly working back down, pump 5x5 sweeps, circulate bottoms up with cement chunks over the shakers, caliper indicates tubing collar at 9140'. 8/8/2017 8/8/2017 0.20 SLOT WELLPR MILL T RBIH to continue under -reaming at 9,075.0 9,141.0 19:09 19:21 9141'. 8/8/2017 8/8/2017 2.10 SLOT WELLPR MILL T Conitinue under -reaming from 9141', 9,141.0 9,212.0 19:21 21:27 stalled at 9149', PUW = 39K, continue reaming to 9190', PUW = 36K', increased motor work observed at 9209', stall, PUW = 42K from 9209', RBIH & again observe increased motor work at 9209', slow and let mill off, again let mill off at 9110', ream to end of pilot -hole at 9212' 8/8/2017 8/8/2017 1.00 SLOT WELLPR MILL T Continue with under -reamer past end 9,212.0 9,216.0 21:27 22:27 of pilot -hole, pumping 1.8 bpm, CWT = 7K, WOB =.3K, FS = 1285 psi, slow reaming at -2'-4' fph, confer with town, decision made to POOH & PU junk mill. 8/8/2017 819/2017 1.55 SLOT WELLPR MILL T Open EDC, begin POOH to PU 2.80" 9,216.0 2,000.0 22:27 00:00 junk mill, pumping 2.2 bpm 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Continue POOH, tag up, space out 2,000.0 84.0 00:00 00:30 8/9/2017 8/9/2017 0.90 SLOT WELLPR MILL T PJSM, flow -check well, LD BHA #3 84.0 0.0 00:30 01:24 1 I over dead well, under -reamer came out looking good, gauging at 2.90" Page 3151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tillie Log Start Depth Smrr Tsne End Time Dur(hr) Phase Op Code Activity Ca Time P -T -x Operation JWB) End Depth(RKB) 8/9/2017 8/9/2017 0.60 SLOT WELLPR MILL T PJSM, PU BHA #4 (0" AKO X-Treme 0.0 80.0 01:24 02:00 motor, Baker G -Force up/down jars, 2.80" five -bladed junk -mill), slide in cart, stab on, check pack -offs, tag up 8/9/2017 8/9/2017 1.70 SLOT WELLPR MILL T RIH with BHA #4 80.0 9,040.0 02:00 03:42 8/9/2017 8/9/2017 0.10 SLOT WELLPR MILL T Tie into formation for a+11.5' 9,040.0 9,078.0 03:42 03:48 correction, close EDC 8/9/2017 8/9/2017 0.70 SLOT WELLPR MILL T Continue RIH, set down twice at 9,078.0 9,216.0 03:48 04:30 9144' (min rate & pumps off), PUW = 40K, bring up pumps to 1.8 bpm, FS = 358 psi, stall at 9142', PUW = 40K, attempt milling at -12 fph and get by, drop rate & continue RIH to 9216', PUH, bring up rate 8/9/2017 8/9/2017 2.00 SLOT WELLPR MILL T Milling at 9216, rate in = 1.8 bpm, FS 9,216.0 9,270.0 04:30 06:30 = 345 psi, CWT = 10K, BHP = 2677 psi, WOB = .5K, Stall at 9270'. Pump 5 x 5 sweeps. 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole to 9155, PUW = 36K, 9,270.0 9,155.0 0630 07:00 Caught sample. 8/9/2017 819/2017 0.50 SLOT WELLPR MILL T Wiper back in hole. RIH = 8K 9,155.0 9,270.0 07:00 07:30 8/9/2017 8/9/2017 2.00 SLOT WELLPR MILL T BOOM, Rate In/Out = 1.8 bpm, FS = 9,270.0 9,336.0 07:30 09:30 355 psi, CWT = 8K, BHP = 2665 psi, WOB = 0.5-2k, ROP=30-70 fph 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole, PUW 40 k 9,336.0 9,160.0 09:30 10:00 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 9,160.0 9,336.0 10:00 10:30 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T BOBM, 1.82 bpm at 3,600 psi, BHP 9,336.0 9,350.0 10:30 11:00 2,749, WHP 0, IA 0, OA 577, 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper up hole PUW 38 k 9,350.0 9,159.0 11:00 11:15 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 5 k 9,159.0 9,350.0 11:15 11:30 8/9/2017 8/9/2017 3.25 SLOT WELLPR MILL T BOBM, 1.79 bpm at 3,830 psi, BHP 9,350.0 9,357.0 11:30 14:45 2,503, WHIP 0, IA 0, OA 595, trouble keeping steady DHWOB, pump 5x5 sweep 8/9/2017 8/9/2017 2.25 SLOT WELLPR MILL T POOH, to check inspect BHA, filling 9,357.0 80.0 14:45 17:00 out trip sheet every 1000' 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T PJSM, flow check, LD BHA #4 over a 0.0 75.0 17:00 18:24 dead well, PU BHA #5 (G -Force up/down jar, agitator, X-Treme motor, 5 blade junk mill, 2.81"), surface test - agitator, good 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T RIH with BHA #5 75.0 9,040.0 18:24 19:48 8/9/2017 8/9/2017 0.30 SLOT WELLPR MILL T Log formation for +11' correction 9,040.0 9,080.0 19:48 20:06 8192017 8/9/2017 0.20 SLOT WELLPR MILL T Continue RIH 9,080.0 9,357.0 20:06 20:18 8/9/2017 8/9/2017 2.10 SLOT WELLPR MILL T OBM, pumping 1.8 bpm, annular= 9,357.0 9,410.0 20:18 22:24 2770, CWT = 9K, WOB = 1.8K, , pump 5x5 sweep, average ROP over interval = 25 fph Page 4/51 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stag Depen Start Time End T. Our T' Phese Op title Aotivky Cade Time P -T -x Operation (m], EM Depthrt a) 8/9/2017 8/9/2017 0.40 SLOT WELLPR MILL T Wiper-tnp up to 9102', PUW = 35K, 9,410.0 9,410.0 22:24 22:48 RIW = 7.5K, no issues RIH past 9141' 8/9/2017 8/10/2017 1.20 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, CWT = 9,410.0 9,463.0 22:48 00:00 7.75K, WOB= 1.8K, BHP = 2780 psi, WOB dropped to OK from 9416'- 9419', encounter green/incompetent cement beginning at 9434' (continued to midnight depth of 9463'), no WOB or motor work observed 8110/2017 8/10/2017 0.50 SLOT WELLPR MILL T Continue in greenrincompetant 9,463.0 9,600.0 00:00 00:30 cement from 9463'to 9600', observe significant cement over shakers 8/10/2017 8110/2017 0.20 SLOT WELLPR MILL T Wiper up -hole to TOC, PUW = 36K 9,600.0 9,090.0 00:30 00:42 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper in-hole, RIW=7K 9,090.0 9,600.0 00:42 00:54 8/10/2017 8/1012017 1.00 SLOT WELLPR MILL T Continue in green cement from 9600', 9,600.0 9,814.0 00:54 01:54 continue to observe significant cement with soft tan material intermixed over shakers, Sulfuric acid (H2SO4) lest on samples indicates cement, though non reactive with tan material, performing short WT's to evaluate hole loading, PUW= 36K -44K 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T 725' wiper trip up to 9090', PUW = 9,814.0 9,814.0 01:54 02:30 37K, RIW = 8.3K, pump 5x5 sweeps 8110/2017 8110/2017 1.50 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, BHP = 9,814.0 9,866.0 02:30 04:00 2878 psi, FS = 869 psi, stall at 9817', PUW = 39K, CWT = 1 OK, WOB =.5K, encounter competent cement again at 9815', pump 5x5 sweep 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T WT up -hole, PUW = 32K 9,866.0 7,836.0 04:00 04:30 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T WT in-hole, lie into formation for = -5' 7,836.0 9,866.0 04:30 05:15 correction, RIW = SK 8/10/2017 8110/2017 3.00 SLOT WELLPR MILL T BOBM, 1.79 bpm at 4,269 psi, BHP 9,866.0 9,950.0 05:15 08:15 2,880, WHP 0, IA 0, OA 608 8/10/2017 6/10/2017 0.25 SLOT WELLPR MILL T Wiper up hole, PUW 38 k 9,950.0 9,700.0 08:15 08:30 8/10/2017 8/102017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 6.4 k 9,700.0 9,950.0 08:30 08:45 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T BOBM, 1.81 bpm at 4,245 psi, BHP 9,950.0 9,971.0 08:45 09:15 2,940, WHP 0, IA 0, OA 606 8/10/2017 8/102017 0.25 SLOT WELLPR MILL T Stall motor, unable to move pipe, Pulll 91971.0 9,971.0 09:15 09:30 65 k, pipe moving, short wiper up hole to 9,806'. 8/10/2017 8/10/2017 2.50 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,380 psi, BHP 9,971.0 10,015.0 09:30 12:00 1 3,050, WHP 0, IA 0, OA 608 8/1012017 8/10/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, PUW 34 k, unable 10,015.0 10,015.0 12:00 12:45 to pump, seems motor is locked up, open EDC, pump 5x5 sweep, 8/10/2017 8/10/2017 1.50 SLOT WELLPR MILL T POOH, pump 2.3 bpm w/open EDC 10,015.0 74.8 12:45 14:15 4,230 psi, filling trip sheet every 1000' 8/102017 8110/2017 0.25 SLOT WELLPR MILL T Al surface, check well for Flow, PJSM 74.8 74.8 14:15 14:30 Page 5151 Report Printed: 9127/2017 t Operations Summary (with Timelog IJepths) AM 3M-27 NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sian Dept Sten Terse End Terse Dw(hr) Phare Op CDde AdT^Code Time P -T -x op.n (ftKS) EM Depth(N(e) 8/10/2017 8110/2017 0.50 SLOT WELLPR MILL T LD milling BHA# 5, inspect tools. 74.8 0.0 14:30 15:00 found BHI motor to be locked up, agitator checked out good. 8110/2017 8/10/2017 0.75 SLOT WELLPR MILL T PU/MU Milling BHA# 6, w/new X- 0.0 74.6 15:00 15:45 Treme motor 8/10/2017 8/10/2017 1.70 SLOT WELLPR MILL T RIH, pumping 0.30 bpm at 1138 psi, 74.6 9,050.0 15:45 17:27 filling trip sheet every 1000'. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Log formation correction of+10 9,050.0 - 9,082.0 17:27 17:39 8/10/2017 8110/2017 0.55 SLOT WELLPR MILL T Continue RIH, RIW = 9K 9,082.0 10,015.0 17:39 18:12 8/10/2017 8/10/2017 1.70 SLOT WELLPR MILL T OBM at 10,015', pumping 1.8 bpm, 10,015.0 10,075.0 18:12 19:54 CWT = 10K, WOB =1.5K, annular = 3004 psi, pumping sweeps to coincide with WT. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper trip (200'), PUW = 35K, RIW = 10,075.0 10,075.0 19:54 20:06 6K 8/10/2017 8110/2017 1.80 SLOT WELLPR MILL T OBM at 10,070', pumping 1.8 bpm, FS 10,075.0 10,126.0 20:06 21:54 =948 psi, CWT =4.5K, WOB =1.1 K, annular = 3078 psi, 54 sweeps coming around. 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T Stall at 10,126', shut down pumps,. 10,126.0 10,117.0 21:54 22:30 PU, start pulling heavy, RBIH, became momentarily detained, bring up pumps, dp jumps up, shut down pumps, jar down twice, jar up 3 times, no success, attempt to bring up pumps, dp increased rapidly (stall condition at 1700 psi diff), shut down pumps, rate out begins to trickle, bring pumps back up, rate out returns, BHA is free, (note: saw DHWOB up to - 15.8K & 70K CWT) 8110/2017 8/10/2017 1.00 SLOT WELLPR MILL T WT (up to 9295'), circulate bottoms 10,117.0 10,126.0 22:30 23:30 up, RIW = 6.5K 8/10/2017 8/11/2017 0.50 SLOT WELLPR MILL T OBM at 10,126', pumping 1.8 bpm, FS 10,126.0 10,138.0 23:30 00:00 = 945 psi, dp = 1042 psi, CWT = 4.6K, WOB = 1.5K, annular = 3110 psi 8/11/2017 8111/2017 1.00 SLOT WELLPR MILL T Continue milling cement at 10,138' 10,138.0 10,165.0 00:00 01:00 pumping 1.8 bpm, CWT = 1.5K, WOB = 2K, annular = 3160 psi, W HP = 0 psi, FS = 945 psi, dp = 1061 psi, IA = 0 psi, OA = 631 psi, pump sweeps 8/11/2017 8/11/2017 0.40 SLOT WELLPR MILL T Sweeps come around, WT (500'), 10,165.0 10,165.0 01:00 01:24 PUW = 38K, RIW = 7K 8/11/2017 8/11/2017 1.60 SLOT WELLPR MILL T OBM at 10.165, pumping 1.8 bpm, FS 10,165.0 10,215.0 01:24 03:00 = 945 ps, CWT = 4.4K, WOB = 1.3K, annular = 3176 psi, pump sweeps - timed for WT 8/11/2017 8/11/2017 0.30 SLOT WELLPR MILL T WT (200'), PUW = 38K, RIW = 4K 10,215.0 10,215.0 03:00 03:18 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T OBM at 10,215' pumping 1.8 bpm, FS 10,215.0 10,270.0 03:18 05:18 =940 psi, CWT =2.5K, WOB =1.9K, annular = 3215 psi, pump sweeps timed for WT 8/1112017 8/11/2017 0.45 SLOT WELLPR MILL T WT up 200', PUW = 40 k, 10,270.0 10,270.0 05:18 05:45 I Page 6151 Report Printed: 912 712 01 7 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SW Depth Start Time End Tkne Dw(hr) Phase Op Code Achvily Cade Time P -T -x Operation (11](B) Ertl Depth MB) 8/11/2017 8/1112017 2.00 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm FS = 4126 10,270.0 10,319.0 05:45 07:45 psi, CTSW=0 k, DHWOB=2.2 k, BHP 2,543, WHP 0, IA 0, OA 659 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Swap milling fluid, wiper up hole, 10,319.0 9,050.0 07:45 08:15 8111/2017 8/11/2017 0.35 SLOT WELLPR MILL T Wiper trip back in hole, RIW 11.5 k 9,050.0 10,220.0 08:15 08:36 8/11/2017 8/11/2017 0.25 SLOT WELLPR MILL T Log formation for depth control 10,220.0 10,259.5 08:36 08:51 1 correction plus 6.5 8111/2017 8/11/2017 0.35 SLOT WELLPR MILL T Continue IH 10,259.5 10,319.0 08:51 09:12 8/11/2017 8/11/2017 1.95 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,535' psi FS, BHP 10,319.0 10,374.0 09:12 11:09 2,705,WHP 0, IA 0. OA 644 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper up hole 500', PUW 36 k 10,374.0 10,374.0 11:09 11:39 8/11/2017 8/11/2017 1.40 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,560 psi, BHP. 10,374.0 10,404.0 11:39 13:03 1 2,795, WHP 0, IA 0, OA 634 8/11/2017 6/11/2017 0.60 SLOT WELLPR MILL T Encountered green cement, RIH wino 10,404.0 10,425.0 13:03 13:39 diff, pumping 1.77 bpm at 3,606 psi, set down 10,424' stall motor. 8111/2017 8/1112017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000' 9,450',. PUW 38 10,425.0 10,425.0 13:39 14:09 k 8111/2017 8/11/2017 0.50 SLOT WELLPR MILL T RIH trying to find bottom, 1.77 bpm at 10,425.0 10,433.0 14:09 14:39 3,581 psi, BHP 2,847, WHP 0, IA 0, OA 628, stall motor, PUW 43 k. "' 29' of green cement 8.75 ppg max 8/11/2017 8111/2017 2.00 SLOT WELLPR MILL T Bring pump back on line, RBIH, 1.8 10,433.0 10,475.0 14:39 16:39 bpm at 3,747 psi, BHP 2,871, IA 0, OA 623 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T wiper trip up hole 1000'(9,475'), PUW 10,475.0 10,475.0 16:39 17:09 42 k 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 10,475', CWT = 10,475.0 10,525.0 17:09 19:09 6K, WOB = 2K, annular = 2965 psi, stall at 10,523', PUW = 45K, continue milling ahead to allow sweep to exit bit. 8/11/2017 8/11/2017 0.85 SLOT WELLPR MILL T WT (1000'), PUW = 40K, RIW = 7K 10,525.0 10,525.0 19:09 20:00 8/1112017 8/11/2017 2.30 SLOT WELLPR MILL T BOBM, 1.8 bpm, CWT =7K, WOB = 10,525.0 10,575.0 20:00 22:18 1.7K, annular = 2946 psi, pump sweeps 8/11/2017 8/11/2017 1.30 SLOT WELLPR MILL T WT, (1000), PUW =43K, tie-in for- 10,575.0 10,565.0 22:18 23:36 19' correction, RIW = 7K, puts new corrected depth at 10,555', tag bottom 10' deeper at 10,565', plan to check counter 8111/2017 8/12/2017 0.40 SLOT WELLPR MILL T OBM, CWT =3.7K, WOB =1.9K, FS= 10,565.0 10,572.0 23:36 00:00 814 psi, annular = 3059 psi 8/12/2017 8/12/2017 3.30 SLOT WELLPR MILL T Continue milling from 10,572', 10,572.0 10,625.0 00:00 03:18 pumping 1.8 bpm, CWT = 4.7K, FS = 814 psi, WOB = 2K, annular = 3044 psi, pump sweeps, stall at 10,585', PUW = 45K, BHA wiper up to 10,485', stall at 10,612', PUW = 43K, prepping to build new milling system on rig, current system at -70K _SRV Page 7151 Report Printed; 912712017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan De)dh Sian Time End Tma W (hr) Phase Op code AcWq Code Time P -T -X Operation (RKB) Ertl 0"M (flKB) 8/12/2017 8/12/2017 1.00 SLOT WELLPR MILL T WT (1000'), PUW = 43K, RIW = 9K 10,625.0 10,625.0 03:18 04:18 Note: Canrig data is faulty/bogus, troubleshoot issue 8/12/2017 8/12/2017 2.90 SLOT WELLPR MILL T OBM, annular= 3144, CWT = 7K , 10,625.0 10,675.0 04:18 07:12 WOB = 1.9K, stalled at 10,639', PUW = 60K 8/12/2017 8/12/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 42 k, Wiper 10,675.0 10,675.0 07:12 07:42 back in hole, RIW 7 k 8112/2017 8/12/2017 2.60 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,700 psi, BHP 10,675.0 10,725.0 07:42 10:18 3,995, WHP 0, IA 0, OA 629, 8/12/2017 8112/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 9,800', PUW 41 k, 10,725.0 10,220.0 10:18 10:48 RBIH, RIW 7 k 8/12/2017 8112/2017 0.50 SLOT WELLPR MILL T Log formation correction of minus 10,220.0 10,268.0 10:48 11:18 61.5', inspect and clean counter 8/12/2017 8/12/2017 0.45 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 10,268.0 10,725.0 11:18 11:45 8/12/2017 8/12/2017 2.25 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,499 psi, BHP 10,725.0 10,784.0 11:45 14:00 2,772, WHP 0, IA 0, OA 596, CTSW=10.2,k, DHWOB=2.2, ROP 21 fph 8/12/2017 8/12/2017 0.75 SLOT WELLPR MILL T Wiper up hole to 9,783', 1000' PUW 10,784.0 10,784.0 14:00 14:45 43 k 8/12/2017 8/12/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,500psi, BHP 10,784.0 10,840.0 14:45 16:45 2,921, WHP 0, IA 0, OA 588, CTSW=7 -10k, DHWOB=2.5k, ROP 30 fph 8/12/2017 8/12/2017 1.20 SLOT WELLPR MILL T Wiper up hole 1000', PUW =40K, 10,840.0 10,840.0 16:45 17:57 RIW = 8.5K 8/12/2017 8/12/2017 1.90 SLOT WELLPR MILL T BOBM pumping 1.78 bpm, CWT = 10,840.0 10,890.0 17:57 19:51 3.2K, WOB = 2.4K, annular = 2871 psi, IA = 0 psi, OA = 586 psi, circ pressure = 3645 psi, stall at 10,858', PUW = 52K, pump 5x5 sweeps 8/1212017 8/12/2017 1.00 SLOT WELLPR MILL T Wiper up -hole 1000', PUW = 42.5K, 10,890.0 10,890.0 19:51 20:51 tie-in for -3' correction, RIW = 8K 8/12/2017 8/12/2017 2.30 SLOT WELLPR MILL T BOSM pumping 1.8 bpm, FS = 800 10,890.0 10,946.0 20:51 23:09 psi, CWT = 6K, WOB = 2K, annular = 2841 psi, circ pressure = 3662 psi 8/12/2017 8/1212017 0.70 SLOT WELLPR MILL T WT up -hole 1000', PUW = 42K, RIW = 10,946.0 10,946.0 23:09 23:51 8K 8/1212017 8/13/2017 0.15 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 778 10,946.0 10,949.0 23:51 00:00 psi, CWT = 3.5K, WOB = 2.3K, annular = 2903 psi 8/13/2017 8/13/2017 1.70 SLOT WELLPR MILL T Continue milling at 10949', pumping 10,949.0 10,990.0 00:00 01:42 1.8 bpm, CWT = 3K, WOB = 2K, annular = 2906 psi, pump sweeps 8/13/2017 8/13/2017 0.70 SLOT WELLPR MILL T Wiper 1000' up -hole, PUW = 43K, 10,990.0 10,990.0 01:42 02:24 RIW = 8K 8/13/2017 8/13/2017 2.80 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 809 10,990.0 11,040.0 02:24 05:12 psi, CWT = 7K, WOB = 2.4K, annular = 2880 psi, WHP = 0 psi, IA = 0 pis, OA = 595 psi, circ pressure = 3775 psi, MW In = 8.47 ppg, MW Out = 8.47 ppg, LSRV = 19.9K, stalled at 11,013', pump sweeps, stall at 11,033', PUW = 52K 8/13/2017 8/13/2017 1.00 SLOT WELLPR MILL T WT up -hole 1000', PUW = 47 k 11,040.0 11,040.0 05:12 06:12 Page 8151 ReportPrinted: 9127120171 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Depth Start Tena End Tine Der (ho Phase op cote A yCode Tim P -T -x opemfiw (fiKB) End Deph(IIxB) 8/13/2017 8113/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,500 psi, BHP 11,040.0 11,090.0 06:12 08:12 2,976, WHP 0, IAO, OA611, CTSW=7 k, DHWOB=2.3 k, ROP 28 fph 8/13/2017 8/13/2017 0.80 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 43 k, with 11,090.0 10,090.0 08:12 09:00 5x5 sweep 8/13/2017 8/13/2017 3.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,759 psi, BHP 11,090.0 11,155.0 09:00 12:00 3,054. WHIP 0, IA 0, OA 629, CTSW=6 k, DHWOB=2.6 k, ROP 29 fph 8/13/2017 8/13/2017 2.50 SLOT WELLPR MILL T Pump 5x5 sweep, POOH, (open EDC 11,155.0 78.8 12:00 14:30 Q 9,093) 8/13/2017 8/13/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 78.8 78.8 14:30 15:00 8/13/2017 8/13/2017 0.75 SLOT WELLPR MILL T LD BHA, remove BHI check valves 78.8 0.0 15:00 15:45 8/13/2017 8/13/2017 2.25 SLOT WELLPR MILL T PUIMU, nozzle, stab INJH, jet stack 0.0 0.0 15:45 18:00 and surface lines, grease tree & stack 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Perform BOPE Test (begin test at 0.0 0.0 18:00 19:00 18:00 hrs), witness waived by AOGCC (Brian Bixby), break off nozzle, slide back cart, put on night-cap. 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Test #1, (fail/pass on low), was 0.0 0.6- 19:00 20:00 leaking past Bleeder 4 8/13/2017 8113/2017 1.40 SLOT WHDBOP BOPE P Continue BOPS test, a bit of difficulty 0.0 0.0 20:00 21:24 getting low on Test #4, pressure up to 1500 psi, bled down, pass 8/13/2017 8113/2017 0.90 SLOT WHDBOP BOPE T Test #5, grease Bravo 2, fail/pass 0.0 0.0 21:24 22:18 8/13/2017 8/13/2017 0.70 SLOT WHDBOP BOPE P Continue BOPE test 0.0 0.0 22:18 23:00 8/13/2017 8/13/2017 0.80 SLOT WHDBOP BOPE T Test #9, grease & cycle Romeo 3, 0.0 0.0 23:00 23:48 fail/pass 8/13/2017 8/14/2017 0.20 SLOT WHDBOP BOPE P Continue BOPE test 0.0 0.0 23:48 00:00 8/14/2017 6/14/2017 2.00 SLOT WHDBOP BOPE P Continue BOPE test (8hr test) 0.0 0.0 00:00 02:00 8/14/2017 8/14/2017 2.00 SLOT WELLPR MILL T Replace houred out UQC, replace 0.0 0.0 02:00 04:00 checks, open & clean out MM & choke lines, transducer lines & TT lines of potential cement fall out, await BOT arrival 8/14/2017 8/14/2017 1.50 SLOT WELLPR MILL T PJSM, PU BHA#7 (2.81" junk mill, 0.0 74.0 04:00 05:30 BOT motor, agitator, up/down jars, 10' pup), slide in cart, stab on, RIH to 738' test agitator (good -test) 8/14/2017 8/14/2017 2.25 SLOT WELLPR MILL T RIH 74.0 10,305.0 05:30 07:45 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T Log formation, too deep, PBUH, re- 10,305.0 10,170.0 07:45 08:15 start logging 10,170' 8/14/2017 8/14/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 36' 10,170.0 10,259.0 08:15 08:30 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T RIH 10,259.0 11,171.0 08:30 09:00 8/14/2017 8/14/2017 1.75 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,400 psi, BHP 11,171.0 11,210.0 09:00 10:45 2,734, WHIP 0, IA 0, OA 497 ' 8/14/2017 8/14/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000'. PUW 43 k, 11,210.0 11,210.0 10:45 11:30 1 1 1 1 1 1 RBIH, RIW 10 k, with 5x5 sweep Page 9151 Report Printed: 912 712 01 7 ;+ Operations Summary (with Timelog Llepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log short oepih Stag Time End Time Dur (m) Pliesa Op Cotler Acbety Code Time P-T.X Operation (WIS) Em DeA(#Ka) 8/14/2017 8/14/2017 1.30 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,180 psi, BHP 11,210.0 11,260.0 11:30 12:48 3,860, WHIP 0, IA 0, OA 494, CTSW=11 k, DHWOB=2.4 k, ROP=45 Ilph 8/14/2017 8/14/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000', PUW 38 k, wiper 11,260.0 11,260.0 12:48 13:33 back in hole, RIW 9 k with 5x5 sweep 8/14/2017 8/14/2017 1.65 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,040 psi, BHP 11,260.0 11,314.0 13:33 15:12 2,825. WHIP 0, IA 0, OA 510, CTSW=9 k, DHWOB=2.9 k, ROP=37 fph 8/14/2017 8/14/2017 0.70 SLOT WELLPR MILL T WT up -hole 1000'@ 100 fpm, PUW = 11,314.0 11,314.0 1512 15:54 41 K, RIW = 11K 8/14/2017 8/14/2017 1.60 SLOT WELLPR MILL T OBM, 1.7 bpm, 1.7 bpm, CWT = 7.51K, 11,314.0 11,365.0 15:54 17:30 WOB = 1.71K 8/14/2017 8/14/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW = 40K, RIW = 11,365.0 11,365.0 17:30 17:54 11K 8/14/2017 8/14/2017 2.70 SLOT WELLPR MILL T OBM, CWT =9K, WOB =2.7K, 11,365.0 11,415.0 17:54 20:36 annular= 2882 psi, circ pressure = 3181 psi 8/14/2017 8114/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', 100 fpm, PUW = 11,415.0 11,415.0 20:36 21:00 1 39K, RIW = 10 K 8/14/2017 8/15/2017 3.00 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT= 6KK, WOB = 11,415.0 11,462.0 21:00 00:00 2.5 K, annular = 2919 psi, FS = 854 psi, pump sweeps, slower ROP at. - 17 fph, PUW = 45K from 11,483' 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Continue milling from 11,462' 11,462.0 11,465.0 00:00 00:12 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T WT up -hole 1000' at 100 fpm, PUW = 11,465.0 11,465A 00:12 00:42 45K, RIW = 10K, pause at 11,452'to inspect/troublshoot depth counter 8/15/2017 8/15/2017 3.50 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT = 6K, WOB = 11,465.0 11,516.0 00:42 04:12 1.91K, annular= 2923 psi, circ pressure = 3335 psi, PU from 11,472 to adjust depth counter, PUW = 44K, stall at 11,508', PUW = 48K 8/15/2017 8/15/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW = 44K, RIW = 11,516.0 11,516.0 04:12 04:36 8K 8/15/2017 8/15/2017 1.15 SLOT WELLPR MILL T A couple stalls getting to bottom, 11,516.0 11,530.0 04:36 05:45 OBM, 1.7 bpm, CWT = 4.81K, WOB = 1.6K, annular= 3012 psi 8/15/2017 8/15/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, differential 1,000 11,530.0 11,435.0 05:45 06:30 psi, higher then free spin. adjust pump rate, looks like we have chucked motor or have a failed agitator, inspect pipe gouge, take pictures, file down gouge, inspect counter heads CTES and INJH. 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T POOH, to inspect BHA 11,435.0 74.2 06:30 08:30 8115/2017 8/15/2017 0.50 SLOT WELLPR MILL T At surface, check well for Flow, PJSM 74.2 0.0 08:30 09:00 - 8/15/2017 8/15/2017 1.50 SLOT WELLPR MILL T LD BHA V. PU BHA#8, (2.81"junk 74.2 580.0 09:00 10:30 mill, BOT motor, agitator, up/down jars, 10' pup) slide in cart, stab on, RIH to 567' test agitator (good -test) 8/15/2017 8/15/2017 1.80 SLOT WELLPR MILL T RIH 580.0 10,210.0 10:30 12:18 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Tie4n, +14' Correction 10,210.0 10,275.0 12:18 12:30 Page 10151 Report Printed: 9/2712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Tete End Tore Dur (hr) Phase Op code Adivity COEe Time P -T -X Operation (BKB) EM Depth(RKB) 6/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T RIH 10,275.0 11,542.0 12:30 13:00 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T Tag TD. BOBM, 1.7 bpm, CWT = 8K, 11,542.0 11,590.0 13:00 15:00 WOB = 2.5K, annular = 3112 psi, circ pressure = 4178 psi, Pump 1% Dril¢one pill at 11,555': No Benefit, Mud -swap, New mud at bit: 11585' 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T WT up hole 1000', PUW = 45k, RIW = 11,590.0 11,490.0 15:00 15:30 10k 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T BOBM, 1.7 bpm, CWT = 12k, WOB = 11,590.0 11,599.0 15:30 16:00 2.6k, annualar = 2880 psi, circ pressure = 3464 psi 8/15/2017 8/15/2017 3.00 SLOT WELLPR MILL T Mechanical coupling on injector drive 11,599.0 11,599.6- 16:00 19:00 chain separated. Wait on parts and repair. Circulate bottoms up. Shut down pumps. Open EDC. Circulate 2nd bottoms up. NAD NPT 3 Hours 8/15/2017 8/15/2017 0.10 SLOT WELLPR MILL T Injector motor coupler replaced, Close 11,599.0 11,599.0 19:00 19:06 EDC. estqabish circulation at .3 BPM up to 1 BPM, PUH, PUW=45K 8/15/2017 8/15/2017 3.40 SLOT WELLPR MILL T PUH clean to 11,480, RBIH to mill 11,599.0 11,650.0 19:06 22:30 cement, 1.7 BPM @ 3285 PSI FS, BHP=2928 8/15/2017 8/15/2017 0.40 SLOT WELLPR MILL T 11650, Wiper up to window with tie in 11,650.0 10,210.0 22:30 22:54 before entering GLM @ 11,666 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Log GR for +2.6' correction 10,210.0 10,259.0 22:54 23:06 8/15/2017 8/15/2017 0.30 SLOT WELLPR MILL T Continue back to bottom to mill 10,259.0 11,651.0 23:06 23:24 8/15/2017 8/16/2017 0.60 SLOT WELLPR MILL T 11651', Mill, 1.7 BPM @ 3331 PSI FS 11,651.0 11,659.0 23:24 00:00 8/16/2017 8/16/2017 2.40 SLOT WELLPR MILL T Continue milling cement, 1.7 BPM @ 11,659.0 11,700.0 00:00 02:24 1 3331 PSI FS, 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pull 1000'vdper trip, PUW=48K 11,700.0 11,700.0 02:24 02:54 8/16/2017 8/16/2017 2.60 SLOT WELLPR MILL T 11,700 Mill Cement, 1.7 BPM @ 3454 11,700.0 11,750.0 02:54 05:30 PSI FS 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=45k 11,750.0 11,750.0 05:30 05:54 8/16/2017 8/16/2017 2.20 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT= 10K, WOB = 11,750.0 11,800.0 05:54 08:06 2.7K, annular = 3010 psi, circ pressure = 3650 psi 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1 000'wiper 11,800.0 11,800.0 06:06 08:36 trip, PUW=43k 8/16/2017 8/16/2017 2.50 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT = 8k, WOB = 11,800.0 11,850.0 08:36 11:06 2.7k, annular = 3115 psi, circ pressure = 3815 psi, Pump 5 bbl low vis sweep at 11,825'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,850.0 11,850.0 11:06 11:36 trip, PUW=44k 8/16/2017 8/16/2017 3.00 SLOT WELLPR MILL T BOBM. Increase rate to 1.8 bpm, 11,850.0 11,904.0 11:36 14:36 CWT = 8k, WOB = 2.8k, annular= 3255 psi, circ pressure = 4820 psi, Continue pumping low vis sweep every 25'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Fluid swap to 11,904.0 11,904.0 14:36 15:06 new system. Pull 1 000'wiper trip, PUW = 43k Page 11/51 Report Printed: 9/2712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sart Depth Stmt Tim End Time Dw(h) Phase Op Cale Aa,* Code Time P -T -X Operation (flKB) End D%Ah MKB) 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T BOBM. 1.8 bpm, CWT =12k, WOB= 11,904.0 11,950.0 15:06 17:24 2.8k, annular = 2975 psi, circ pressure = 3575 psi 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,950.0 11,950.0 17:24 17:48 trip, PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 11950 Mill, 1.8 BPM @ 3504 PSI FS 11,950.0 12,000.0 17:48 20:06 8116/2017 8/16/2017 0.40 SLOT WELLPR MILL T 12000', pump sweeps, pull 1000' 12,000.0 12,000.0 20:06 20:30 wiper. PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 12,0001, Mill, 1.8 BPM @ 3596 PSI. 12,000.0 12,050.0 20:30 22:48 FS, BHP=3081 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T 12050', Pump sweeps, pull 1000' 12,050.0 12,050.0 22:48 23:18 wiper, PYW=45K 8/16/2017 8/17/2017 0.70 SLOT WELLPR MILL T 12050', Mill, 1.8 BPM @ 3627 PSI FS, 12,050.0 12,066.0 23:18 00:00 BHP=3081 8/17/2017 8/17/2017 1.50 SLOT WELLPR MILL T 12066', Milling cement, 1.8 BPM @ 12,066.0 12,100.0 00:00 01:30 3627 PSI FS, BHP=3100 8/17/2017 8117/2017 0.50 SLOT WELLPR MILL T 12,100% Pump sweeps, pull 1000' 12,100.0 12,100.0 01:30 02:00 wiper, PUW=48K 8/17/2017 8117/2017 1.50 SLOT WELLPR MILL T 12105', milling, 5' difference in bottom, 12,100.0 12,134.0 02:00 03:30 1.8 BPM @ 3676 PSI FS, BHP=3112 8/1712017 8/17/2017 2.50 SLOT WELLPR MILL T Motor stall, Pull off bottom motor 12,134.0 74.2 03:30 06:00 would not relieve pressure, Diff pressire 1700PSI @ .9 BPM. Can not get it to clear, Trip out for BHA. 8/17/2017 8/17/2017 1.10 SLOT WELLPR MILL T Verify well is dead. Unstab Injector. 74.2 0.0 06:00 07:06 LD Mill, Motor, and Agitator. Test motor and agitator at surface with rig water and rig air. Inconclusive. Make up Agitator and nozzle. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Change out BOP manifold pressure 0.0 0.0 07:06 07:36 regulator. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Stab injector. Function test Agitator 0.0 0.0 07:36 08:06 from BHA #8 at surface on coil. 1.5 bpm, 1415 differential pressure. No agitation felt at surface. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 0.0 08:06 08:36 #8. PU Agitator from BHA #7 and nozzle. 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T Stab injector. Function test Agitator 0.0 0.0 08:36 09:00 from BHA #7 at surface on coil. 1.5 bpm, 667psi. 1.8 bpm 825 psi. No agitation felt at surface. 8/17/2017 8/17/2017 0.70 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 73.6 09:00 09:42 V. PU BHA #9. D331 Ridge Set, BOT Motor, new Agitator. Stab injector. Replace stripper pack -off. 8/17/2017 8/17/2017 0.30 SLOT WELLPR MILL T RIH to 480'and shallow test Agitator. 73.6 480.0 09:42 10:00 1.8 bpm. Vissible vibration on counter wheel. 8/17/2017 8/17/2017 2.20 SLOT WELLPR MILL T RIH. Tie-in +17' correction. RIH to 480.0 12,132.0 10:00 12:12 bottom. 8/17/2017 8/17/2017 1.30 SLOT WELLPR MILL T BOBM. 1.7 bpm, Free Spin = 870 psi, 12,132.0 12,185.0 12:12 13:30 CWT = 11 K, WOB = 2K, annular = 3190 psi, circ pressure = 4200 psi. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=47k. 12,185.0 12,185.0 13:30 14:00 Page 12151 Report Printed: 9127/2017 Operations Summary (with Timelog I)epths) 3M-27 cor�occiphllh Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth start Tena End Pme Dar(hr) phase Op Cade A.Wity Code Time Ip -T -X Operation (ftKB) End Depth(WB) 8/17/2017 8/17/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,185.0 12,232.0 14:00 15:00 WOB=2.5k, annular -3180 psi, circ=4200 psi. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=50k. -_ 12,232.0 12,232.0 15:00 15:30 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=7k, 12,232.0 12,282.0 15:30 17:06 WOB=2.5k, annular -3300 psi, circ=4360 psi. 8/17/2017 8/17/2017 0.60 SLOT WELLPR MILL T Pull 1000' wiper trip, PUW=53k. 12,282.0 12,282.0 1706 17:42 8/17/2017 8/17/2017 1.40 SLOT WELLPR MILL T 12282', Mill, 1.7 BPM @ 4090 PSI FS, 12,282.0 12,335.0 17:42 19:06 BHP=3320 8/17/2017 8/17/2017 0.30 SLOT WELLPR MILL T 12335, 1000' wiper, PUW=48K 12,335.0 12,335.0 19:06 19:24 8117/2017 8/17/2017 2.50 SLOT WELLPR MILL T 12335', Mill, 1.7 BPM @ 4090 PSI FS, 12,335.0 12,387.0 19:24 21:54 BHP=3320, New milling fluid around @ 12362 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T 12387, 1000' wiper, PUW=52 K 12,387.0 12,387.0 21:54 22:18 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T 12387', Mill, 1.7 BPM @ 3660 PSI FS, 12,387.0 12,435.0 22:18 23:54 BHP=3395 Cement void @ 12410 to 12414 with no WOB of differential pressure 8/17/2017 8/18/2017 0.10 SLOT WELLPR MILL T 12435, 1000'wiper, PUW=53K 12,435.0 12,040.0 2354 00:00 8/18/2017 8/18/2017 0.30 SLOT WELLPR MILL T Continue 1000'wiper from 12434 12,040.0 12,434.0 00:00 00:18 8/18/2017 8/18/2017 1.60 SLOT WELLPR MILL T 12434', Milling, 1.7BPM @ 3352 PSI 12,434.0 12,478.0 00:18 01:54 FS, BHP=3248, Couple of stalls in 12472' area. Posible seal locator 8/18/2017 8118/2017 1.60 SLOT WELLPR MILL T During walkaroud injector motor 12,478.0 12,464.0 01:54 03:30 coupler coming loose. PUH and circulate bottoms up. Open EDC and continue to circulate. Begin NAD NPT _ Start couple repair, 1.5 Hrs NAD NPT 8/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T Repairs complete, shut EDC. 12,464.0 10,200.0 03:30 04:06 Continue wiper trip to tie in 8118/2017 8/1812017 0.20 SLOT WELLPR MILL T Log tie in for+17' correction 10,200.0 10,242.0 04:06 04:18 8/18/2017 8118/2017 0.50 SLOT WELLPR MILL T RBIH to mill cement 10,242.0 12,492.0 04:18 04:48 8/18/2017 811812017 3.00 SLOT WELLPR MILL T 12490', Mill, 1.7 BPM @ 3320 PSI FS, 12,492.0 12,550.0 04:48 07:48 BHP=3267, RIW=9.3K. Multiple stalls passing through jewelry. 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Wiper trip up hole 1000'. PUW=52k. 12,550.0 12,550.0 07:48 08:18 8/18/2017 8/18/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,550.0 12,576.0 08:18 09:18 WOB=1.6k, annular -3315 psi, circ=3700 psi. 8/18/2017 8/18/2017 1.40 SLOT WELLPR MILL T Tag D Profile nipple at 12,576' Mill 12,576.0 12,576.0 09:18 10:42 through with 6 stalls. 8/18/2017 8/18/2017 0.80 SLOT WELLPR MILL T Mill 9' below profile nipple. 1.7 bpm, 12,576.0 12,585.0 10:42 11:30 WOB=1.5k, annular -3340 psi, circ=3720 psi. Stalls at 12,582. Pickup through nipple with pumps off. ' No over pulls. 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Wiper up hole. 12,585.0 10,200.0 11:30 12:00 Page 13151 Report Printed: 912 712 01 7 Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start DepN SWn Time End Time Dur (ho Phase Op Code Ac fty Code Time P -T -X Operation (flkB) End Depth(flKB) 8/18/2017 8/18/2017 0.70 SLOT WELLPR MILL T Tie -In. +6.5' Correction. RIH to 10,200.0 12,300.0 12:00 12:42 logging depth. 8/18/2017 8118/2017 0.30 SLOT WELLPR MILL T Log CCL from 12,300' to 12585' 12,350.0 12,589.0 12:42 13:00 8/18/2017 8118/2017 2.50 SLOT WELLPR MILL T POOH. Open EDC at 8975'. Close 12,589.0 73.6 13:00 15:30 EDC for Agitator test. Test Agitator at 307'. Goosneck vibrating. Re -Open EDC. 8/18/2017 8/18/2017 1.00 SLOT WELLPR MILL T PJSM. Verify well is static. Un -Stab 73.6 0.0 15:30 16:30 injector. LD BHA #9. Gauge mill 2.76" No -Go. Discuss next BHA with town. 8/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T PU BHA#10. Re -Run 2.76" D331 0.0 71.9 16:30 17:06 Ridge Set, Hailey Under Reamer with 2.875" banana blades, BOT motor, 2.73" stabilizer, BOT jars. Replace stripper packing. Stab injector. 8/18/2017 8118/2017 2.00 SLOT WELLPR MILL T RIH with EDC open. 71.9 10,200.0 17:06 19:06 8/18/2017 8/18/2017 0.20 SLOT WELLPR MILL T Log tie in point for+16' correction 10,200.0 10,260.0 19:06 19:18 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Continue in well 10,260.0 12,569.0 19:18 19:48 8/18/2017 8/18/2017 0.10 SLOT WELLPR MILL T Tag up @ 12569, Pull up to break . 12,569.0 12,559.0 19:48 19:54 over, PUW=51 K, P/U 10 mpre feet .8118/2017 8119/2017 4.10 SLOT WELLPR MILL T Close ECD, Pring pumps online @ 1.7 12,559.0 10,397.0 19:54 00:00 BPM @ 4990. High vibration. Reduce _ rate to 1.5 BPM @ 4400 PSI. Vibration managable, Ream uphole @ 10 FPM. See additional motor work @ 12345, 12332, 12323, 12279, 12157, and 12140 8/19/2017 8/19/2017 2.30 SLOT WELLPR MILL T Continue reaming up @ 10 FPM, 1.5 10,397.0 9,100.0 00:00 02:18 BPM @ 4400 PSI FS, Ream up to orginal TOC, Pump 5 X 5 sweeps, Open edc 8/19/2017 8/19/2017 1.60 SLOT WELLPR MILL T Trip out of well, EDC open 9,100.0 101.0 02:18 03:54 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T At surface, Flow check well, PJSM lay 101.0 0.0 03:54 04:54 down BHA on dead well, U/reamer arms at 2.75" lower and 2.78" upper 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T WU BHA #11 with 2.79 NoGo D331 0.0 74.6 04:54 05:54 mwilh ridge cutters on straight BOT motor 8/19/2017 8/19/2017 2.70 SLOT WELLPR MILL T RIH. Shallow test Agitator at 328'. Tie 74.6 12,579.0 05:54 08:36 -In +21' correction. Tag D -Nipple at 12,579' 8/19/2017 8/19/2017 1.20 SLOT WELLPR MILL T Dress up D -Nipple. 1.7 bpm. Free 12,576.0 12,587.0 08:36 09:48 Spin: 840 psi. High vibration. 1 Stall. Tag TD. Drift back through minimum rate. Make 7 down reaming passes. 8/19/2017 8/19/2017 2.20 SLOT WELLPR MILL T POOH. Shallow test agitator. 12,587.0 102.0 09:48 12:00 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T Verify well is static. PJSM. Un -Stab 102.0 0.0 12:00 13:00 Injector. LD BHA #11. Gauge mill 2.75" No Go. 8/19/2017 8/19/2017 1.50 SLOT WELLPR MILL T Discuss next BHA with town. PU BHA 0.0 74.7 13:00 14:30 #12, 2.80" slick D331. Check packing in stripper. Slab Injector. Page 14151 Report Printed: 912712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Tune End Time our(hr) Phase Op Code Achvity Code Time P -T -X Operation (MB) End Depth(flKB) 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T RIH. Shallow test Agitator at 380'. Tie 74.7 12,587.0 14:30 16:36 -In +20' correction. pass through D - Nipple at 12577, Tag bottom @ 12,587 8/19/2017 8/19/2017 1.80 SLOT WELLPR MILL T Make multiple passes through nipple 12,587.0 12,580.0 16:36 18:24 area, 5. Dry drift nipple area - good 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T POOH, stop and open EDC @ 12556 12,580.0 95.0 18:24 20:30 8/19/2017 8/19/2017 0.50 SLOT WELLPR MILL T At surface, Flow check well, Lay down 95.0 0.0 20:30 21:00 BHA #12, Mill out @ 2.79 NoGo 8/19/2017 8/19/2017 1.30 PROD1 RPEQPT PULD P Make up BHA # 13 with new D-331 0.0 68.5 21:00 22:18 slick gauge mill, .9° AKO motor and agitator, M/U to coil and surface test, Inspect packoffs 8/19/2017 8/20/2017 1.70 PRODt RPEQPT TRIP P Trip in hole, BHA #13 pilot hole 68.5 8,660.0 22:18 00:00 milling, 700'shallow test agitator - good. Continue in 8/20/2017 8/20/2017 0.30 PROD1 RPEQPT TRIP P Continue tripping in well - 8,660.0 10,200.0 00:00 00:18 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT DLOG P Log Gamma tie in for+15.5', 10,200.0 10,249.1 00:18 00:30 8/20/2017 8/20/2017 0.70 PROD1 RPEQPT TRIP P Continue trip in, Bring pump online @ 10,249.1 12,588.0 00:30 01:12 12544. Clean pass through milled D nipple area 8/2012017 8/20/2017 6.50 PROD1 RPEQPT MILL P Tag up @ 12588 and mill ahead, 1.7 12,588.0 12,716.0 01:12 07:42 BPM @ 3588 PSI FS. Stall and hard going @ 12598. Call 7" contact. Had to roll TF to 200' to get milling. 12599' roll TF back to 20R, ROP 20-25 FPH with - 2K DHWOB. Stalls at 12,703' and 12,705'. Orienter loosing high side at 12708' Suspect magnetic interference. Lock orienter 20R. 8/20/2017 8/20/2017 0.40 PROD1 RPEQPT MILL T Injector coupling separating again. 12,716.0 12,589.0 07:42 08:06 Pickup into tubing tail to repair. 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT MILL T RIH back to bottom. 12,589.0 12,716.0 08:06 08:12 8/20/2017 8/20/2017 3.60 PROD1 RPEQPT MILL P BOBM. 1.7 bpm, WOB=2k, 12,716.0 12,755.0 08:12 11:48 Annular -3510 psi, Pump=4090 psi. Odenter locked based on internal highside toolface. 3 stalls at 12,730'. Pickup and re -verify toolface. Difficulty working past 12,730' ROP returned to 207hr after passing. TD pilot hole at 12,755' 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P POOH to back ream transition. 12,755.0 12,603.0 11:4811:54 PUW=48k. 8/20/2017 8/20/2017 0.30 PROD1 RPEQPT REAM P Orient low side. Back ream transition. 12,603.0 12,584.0 11:54 12:12 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT TRIP P TIH. HOT still giving erratic readings 12,584.0 12,755.0 12:12 12:24 at 12,619' and 12,708'. Pump 5 x 5 sweep at TD. 8/20/2017 8/20/2017 0.60 PROW RPEQPT CIRC P PUH into tubing tail. Wait for sweeps 12,755.0 12,476.0 12:24 13:00 to surface. 8/20/2017 8/20/2017 0.40 PROD1 RPEQPT DLOG P Dry drift from tubing tail into pilot hole. 12,476.0 12,755.0 13:00 13:24 Tie -In with K1 marker. Zero Correction. 1k set downs 12,595' and 12,615'. Tag TD. Page 15151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Ltepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log 51aM1 Depth Start 7vne End Time Our (hr) Phase Op Catle Activity Code Time P -T -X Ope2fion (711®) Ertl Depth (fiKa) 8/20/2017 8/20/2017 1.50 PRODi RPEQPT REAM P Back ream from 12,615'to tubing tail. 12,755.0 12,584.0 13:24 14:54 Dry drift second time: 1 k weight at 12,595' and 0.5k at 12,615'. Back ream from 12,615'to tubing tail. Dry drift third time. PUH. Ream down at 5'/min, back ream up. Dry drift fourth time. Weight bobble less than 0.75k. 8/20/2017 8/20/2017 2.00 PROD1 RPEQPT TRIP P POOH. Shallow test Agitator at 580'. 12,620.0 109.0 14:54 16:54 Good test. 8/20/2017 8/20/2017 1.80 PROD1 RPEQPT PULD P PJSM. Verify well is static. Unstab 109.0 0.0 16:54 18:42 Injector. LD BHA #13. Gauge Mill: 2.60 No Go. 8/20/2017 8/20/2017 1.00 PROD1 RPEQPT PULD P PJSM, M/U BHA #14 HES caliper; 0.0 24.6 18:42 19:42 M/U to coil and surface lest caliper. 8/20/2017 820/2017 2.30 PROD1 RPEQPT TRIP P RIH BHA #14 pilot hole caliper run 24.6 12,500.0 19:42 22:00 8/202017 820/2017 0.20 PROD1 RPEQPT DLOG P Tie into K1 for+19.3 12,500.0 12,658.0 22:00 22:12 8/20/2017 820/2017 0.10 PROD1 RPEQPT TRIP P Continue in well 12,658.0 12,744.0 22:12 22:18 8/20/2017 820/2017 0.10 PROD1 RPEQPT DLOG P PUH logging pilot hole 1st run, 12,744.0 12,500.0 22:18 22:24 PUW=52K 8/20/2017 820/2017 0.10 PRODt RPEQPT TRIP P Trip back to bottom 12,500.0 12,744.0 22:24 22:30 8/20/2017 8/20/2017 1.30 PROD1 RPEQPT DLOG P PUH logging to 8900, PUW=52K 12,744.0 8,900.0 22:30 23:48 8/20/2017 821/2017 0.20 PROD1 RPEQPT TRIP P End of logging pass, Close caliper 8,900.0 8,503.0 23:48 00:00 1 fingers, Trip out of well 8/21/2017 821/2017 1.50 PRODt RPEQPT TRIP P Continue tripping out with HES caliper 8,503.0 67.0 00:00 01:30 8/212017 8/21/2017 0.30 PROD1 RPEQPT PULD P PJSM, Lay down BHA #14 on dead 67.0 0.0 01:30 01:48 well 8/21/2017 8/21/2017 1.20 PROD1 RPEQPT PULD P PJSM, WU BHA#15, Whipstock with 0.0 74.0 01:48 03:00 OH anchor, WU to coil and surface test 8/2112017 8/21/2017 2.40 PROD1 RPEQPT TRIP P RIHw/Whipstock 74.0 12,600.0 03:00 05:24 8/21/2017 8/21/2017 0.10 PROD1 RPEQPT DLOG P Log K1 for+15.5 12,600.0 12,625.0 05:24 05:30 -. 8/21/2017 8/21/2017 0.70 PROD1 RPEQPT TRIP P Continue to setting depth, PUW=49K, 12,625.0 12,722.7 05:30 06:12 continue up hole to 12695 trying to get orientation to clear up. PUH to 12635, RBIH to 12655'. tool seems stable, RBIH to set depth 12,722.7. Using internal TF. Close EDC. Pumps on, See tool shift @ 3700 PSI, DHWOB to 2.02K. Set down 2.51K - Good. 8/21/2017 821/2017 2.80 PROD? RPEQPT TRIP P Open EDC. POOH. 12,722.7 100.0 06:12 09:00 8/212017 8/21/2017 0.20 PROD1 RPEQPT CTOP T Observe CT indention at 79.5' from 100.0 100.0 09:00 09:12 whip end. Photograph damage. 8/212017 8/21/2017 0.80 PROD1 RPEQPT PULD P PJSM. Verify well is static. Un -Stab 100.0 0.0 09:12 10:00 injector. LD BHA#15. 8/21/2017 8/21/2017 1.00 PROD1 RPEQPT CIRC P Close master valve. PU ri=le. Re- 0.0 0.0 10:00 11:00 Stab injector. Jet out stack and surface lines. Page 16151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Llepths) 3M-27 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SW Time End Time Duf(hr) Phase op Cede M%* Cade Time P-T-X CpmaOon slab Depth it") End DWh(MM) 8/21/2017 8/21/2017 1.50 PROD1 RPEQPT CIRC P Un-stab injector. Grease tree valves. 0.0 0.0 11:00 12:30 Install test joint cycle rams and circulate citric acid through slack. Pull test joint cycle rams and circulate citric acid followed by fresh water. Install BOP test cap. 8/21/2017 8/21/2017 0.80 PROD1 RPEQPT BOPE P PJSM. Begin BOP test at 12:30 0.0 0.0 12:30 13:18 hours. Witness waived by AOGCC (Jeff Jones). Tests to 250 psi low, 42000 psi high. Attempt shell test. Regrease C5. Replace bleeder on C4. 8/21/2017 8/21/2017 1.60 PROD1 RPEQPT BOPE P Test #1(Upper Swab): Pass 0.0 0.0 13:18 14:54 Test#2 (Obsolete) Test #3 (Lower Blind/Shear, TV2): Pass Test #4 (TV1): Pass Test #5 (Upper Blind/Shear, B1, B5, C4, C5, C8, C12, R1, BL1): Pass Test #6 (C3, C6, C7, C11, B2, B6, T2): Fail 821/2017 8121/2017 0.60 PROD1 RPEQPT BOPE T Re-Grease C7 and C11. 0.0 0.0 14:54 15:30 Re-Test #6: Pass 8/21/2017 8/21/2017 2.90 PROD1 RPEQPT BOPE P Test #7 (Choke D, Choke C): Pass 0.0 0.0 15:30 18:24 (1500 psi / Function) Test #8 (C2, C10, T1): Pass Test #9 (R2, BL2, C1, C9): Pass Test #10 (B4, B8, R3, BL3): Pass Test #11(B3, 67): Pass Remove tree rap. Install testjoint and fill. Test gas alarms: Pass Test #12 (Annular): Pass (2500 psi) Test #13 (Upper 2-318, Upper TIW): Pass Test #14 (Lower 2-3/8): Pass Test #15 (Lower Pipe/Slip): Fail 8121/2017 1812112017 0.60 PRODt RPEQPT ROPE T Cycle ram. 0.0 0.0 18:24 19:00 Re-Test #15: Pass 8/21/2017 8/21/2017 2.10 PROM RPEQPT BOPE P Test#16 (Upper Pipe/Slip, Lower 0.0 0.0 19:00 21:06 TIW): Pass Accumulator recharge: Pass Remove test joint. Re-Stab Injector. Test inner reel valve and stripper: Pass BOP test complete. Blow down drilling choke. 8121/2017 81212017 0.90 PROD1 RPEQPT CTOP T LD noale, blind sub, and UQC. Boot 0.0 0.0 21:06 22:00 wireline. Stab injector. Pump slack backwards. Un-slab injector. 8/21/2017 8/22/2017 2.00 PROD1 RPEQPT CTOP T PJSM. Cul 193' of coil to remove 0.0 0.0 22:00 00:00 damage. Cut 88' pipe to find wire 8/22/2017 8/22/2017 2.00 PROD1 RPEQPT CTOP T Continue making up coil tubing 0.0 0.0 00:00 02:00 connector, Pull test to 35K - Good. M/U UQC, Test wire (>550 Mohms 177.4 Ohmes). Fluid pack coil and pressure test CTC and UQC to 4450 PSI 8/22/2017 8/22/2017 0.50 PROM RPEQPT CTOP Skid back injector / Run pipe into pipe 0.0 0.0 02:00 02:30 j shed inspecting gripper blocks - I Chains for damage or foreign objects Page 17151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Sean Time Ertl Time Dw(M) Phase Op cede Activity Cade Time P -T -X Operation (ftKB) End Depth(ftKB) 8/2212017 8/22/2017 1.30 PROD1 WHPST PULD P PJSM, MID PIU BHA # 16 Window 0.0 74.3 02:30 03:48 milling BHA with .6° motor, 2.79 string reamer, and 2.80 dimond window mill, Make up to coil and surface test - good 8/22/2017 8/22/2017 2.30 PROD1 WHPST TRIP P RIH, EDC open, Pumping 1 BPM 74.3 12,583.0 03:48 06:06 8/22/2017 8/2212017 0.70 PROD1 RIGMNT TRIP T Inspect coupler/Tighten 12,583.0 12,583.0 06:06 06:46 8122/2017 8/2212017 0.10 PROD1 WHPST TRIP P Continue in well 12,583.0 12,600.0 06:48 06:54 8/2212017 8/22/2017 0.10 PROD1 WHPST DLOG P Lag K1 for+15.5' 12,600.0 12,628.0 06:54 07:00 8/2212017 8/22/2017 0.70 PROD1 WHPST TRIP P Continue in well displaceing used 12,628.0 12,713.0 07:00 07:42 8.8ppg PwrPro tripping in, stop @ 12651 and close EDC, Dry tag whipstock @ 12713. Having tool face issues. go to MWD internal toolface 8/22/2017 8/22/2017 4.80 PROD1 WHPST MILL P Milling Window, 12713', 1.6BPM @ 12,713.0 12,719.0 07:42 12:30 3685 PSI FS, BHP=3753 8/22/2017 8/22/2017 3.40 PROD1 WHPST MILL P Call bottom of window 12719, Milling 12,719.0 12,735.0 12:30 15:54 rathole 8/22/2017 8/22/2017 2.50 PROD1 WHPST REAM P At bottom of rat hole, ream window 12,735.0 74.0 15:54 1824 per procedure, PUW=40K As drilled, 30` ROHS, 30° LOHS, 180° ROHS 8/22/2017 8/22/2017 3.00 PROD1 WHPST TRIP P POOH, Marks and Gouge on coil, take 74.0 74.0 18:24 21:24 pictures, and upload to s:drive. 8/22/2017 8/22/2017 0.70 PROD1 WHPST OWFF P At surface, check well for flow, PJSM 74.0 74.0 21:24 22:06 8/22/2017 8/22/2017 1.60 PROD1 WHPST PULD P PUD & LD Window milling BHA, 74.0 0.0 22:06 23:42 Window Mill 2.78 no-go, string mill 2.79 no-go 8/22/2017 8/23/2017 0.30 PROD1 DRILL PULD P PU/MU Build Section BHA# 17 0.0 0.0 23:42 00:00 8/23/2017 8/23/2017 0.50 PROD1 DRILL PULD P Continue. PUIMU/ PD build section 0.0 0.0 00:00 00:30 BHA# 17 8/23/2017 8/23/2017 1.00 PROD1 DRILL PULD T Scope change, kink in slick line. 0.0 0.0 00:30 01:30 PJSM, swap to ODS PDL. 8/23/2017 8/23/2017 1.50 PROD1 DRILL PULD P Continue PD Buld BHA# 17 0.0 72.2 01:30 03:00 j 8/23/2017 8/23/2017 0.20 PRODI DRILL PULD P Surface lest BHI tools (good test), 72.2 72.2 03:00 03:12 stab INJH, tag up, reset counters 8/23/2017 8/23/2017 2.30 PROD1 DRILL TRIP P RIH 72.2 12,585.0 03:12 05:30 8/23/2017 8123/2017 0.20 PROD1 DRILL DLOG P Log Kt for+20.5' 12,585.0 12,633.0 05:30 05:42 8/23/2017 8/23/2017 0.20 PROD1 DRILL TRIP P Continue in well, Close EDC @ 12,633.0 12,735.0 05:42 05:54 12677, PUW=44K, Clean pass through window, Tag up at 12735 8/23/2017 8/23/2017 1.80 PROD1 DRILL DRUG P 12735', Drill, 1.8 BPM @ 4375 PSI 12,735.0 12,808.0 05:54 07:42 FS, BHP=3846 8/23/2017 8/23/2017 0.20 PROD1 DRILL WPRT P PUH to tie in and log RA, PUW=42K 12,808.0 12,600.0 07:42 07:54 8/23/2017 8/23/2017 0.10 PROD1 DRILL DLOG P Log K1 for -1' RIH and log RA @ 12,600.0 12,730.0 07:54 08:00 1 1 1 1 1 12719, TOWS=12712.5 8/23/2017 8/23/2017 0.30 PROD1 DRILL WPRT P RBIH to drill 12,624.0 12,808.0 08:00 08:18 I Page 18/51 Report Printed: 912712017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM Depth Start Time End Time Dw (hr) Phew Op Code Ac" Code Time P-T.X Opem ion (tKB) End Depth mKB) 8/23/2017 8/23/2017 2.20 PROD1 DRILL DRLG P 12808', Drill ahead, 1.8 BPM Qa 4352 12,808.0 12,818.0 08:18 10:30 PSI FS, BHP=3902 8/23/2017 8/23/2017 6.50 PROD1 DRILL DRLG P PUW 40 k, OBD 1.8 bpm at 4318 psi 12,818.0 12,950.0 10:30 17:00 FS, BHP 3,897, IA 0, OA 483 812312017 8/23/2017 2.50 PROD1 DRILL TRIP P PUH slowly until sweep out the bit, 12,950.0 72.2 17:00 19:30 POOH 8/23/2017 8/23/2017 1.15 PROD1 DRILL PULD P PJSM, PUD & LD build section BHA 72.2 0.0 19:30 20:39 8/23/2017 8/23/2017 1.50 PROD1 DRILL PULD P PU/MU/PD lateral section BHA, BHA# 0.0 78.2 20:39 22:09 18, surface test tools (good -test) 8/23/2017 8/24/2017 1.85 PRODt DRILL TRIP P Tag up, reset counters, RIH 78.2 8,500.0 22:09 00:00 8/24/2017 8124/2017 0.50 PROD1 DRILL TRIP P Continue RIH 8,500.0 12,595.0 00:00 00:30 8/24/2017 8/24/2017 0.10 PROD1 DRILL DLOG P Log the K1 marker correction of plus 12,595.0 12,615.0 00:30 00:36 22', PUW 41 k, RIW 13 k 8/24/2017 8/2412017 0.30 PRODt DRILL TRIP P Continue in well 12,615.0 12,951.0 00:36 00:54 8124/2017 8/24/2017 3.40 PROD1 DRILL DRLG P OBD 1.8 bpm at 4,896 psi FS, BHP 12,951.0 13,360.0 00:54 04:18 3970, WHIP 106, IA 0, OA 373, CTSW=12 k, DHWOB=2.0 k, R0P=100 fph 8/24/2017 8/24/2017 0.40 PROD1 DRILL WPRT P Wiper to 12980', PUW=41K 13,360.0 13,360.0 04:18 04:42 8/24/2017 8/24/2017 9.00 PROD1 DRILL DRLG P 13360', Drill, 1.76 BPM Q 4785 PSI 13,360.0 13,760.0 04:42 13:42 FS, BHP=3843, RIW=10.8K, Encountered more Ankonte 8/24/2017 8/24/2017 0.75 PROD1 DRILL WPRT P 13760', Wiper to 12975', PUW=45K 13,760.0 13,760.0 13:42 14:27 8/24/2017 8/24/2017 6.40 PROD1 DRILL DRLG P 13760', Drill, 1.8 BPM @ 5037 PSI 13,760.0 14,160.0 14:27 20:51 FS, BHP=3862 PSI, RIW=10K 8/24/2017 8/24/2017 0.50 PROD1 DRILL WPRT P Wiper up hole to 12,725', PUW 45 k 14,160.0 12,735.0 20:51 21:21 8/24/2017 8/24/2017 0.25 PROD1 DRILL DLOG P Log the RA correction of plus 2.5' 12,735.0 12,766.0 21:21 21:36 8/24/2017 8/24/2017 0.50 PRODt DRILL WPRT P Wiper back in hole, RIW 13 k 12,766.0 14,160.0 21:36 22:06 8/24/2017 8/25/2017 1.90 PROD1 DRILL DRLG P BOBD 1.8 bpm at 3,908 psi FS, BHP 14,160.0 14,167.0 22:06 00:00 3,946, WHP 67, IA 0, OA 560, CTSW =11.3 k, DHWOB=2.9 k, ROP 2 fph 8/25/2017 8/25/2017 3.50 PRODt DRILL DRLG P OBD, 1.8 bpm at 5,153 psi, 14,167.0 14,339.0 00:00 03:30 BHP=3,975, WHP=63, IA=O, OA=546, CTSW=4.4 k, DHWOB=2.9 k, ROP 60 fph 8/25/2017 8/25/2017 3.30 PROD1 DRILL DRLG P OBD, 1.8 bpm at 5,395 psi, 14,339.0 14,560.0 03:30 06:48 BHP=3,975, WHP=55, IA=O, OA=569, CTSW=2.2 k, DHWOB=2.5 k, ROP=62 fph 8/25/2017 8/25/2017 0.70 PRODt DRILL WPRT P 14560', Wiper to 13560', PUW=45K 14,560.0 14,560.0 06:48 07:30 8/25/2017 8/25/2017 4.40 PROD1 DRILL DRLG P 14560', Drill 1.78 BPM Q 5100 PSI 14,560.0 14,875.0 07:30 11:54 FS, BHP=3956, Avg ROP 40-60 FPH, Encountered signs of ankorite with low to no ROP. Good weight transfer 8/25/2017 8/25/2017 0.30 PRODt DRILL WPRT P Pull Mini wiper, PUW=52K 14,875.0 14,875.0 11:54 12:12 Page 119511 Report Printed: 9127120171 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Sten Time Ertl none our (hr) phase Op Cafe Activity Code Time PJ -x Operation Me) End Depth dtKil) 8/25/2017 8/25/2017 6.00 PROM DRILL DRLG P 14875', Drill, 1.75 BPM @ 5100 PSI 14,875.0 14,920.0 12:12 18:12 FS, BHP=4002 8/25/2017 8/25/2017 0.25 FROM DRILL WPRT P BHA wiper 14,920.0 14,920.0 18:12 18:27 8/25/2017 8/2512017 1.50 PROD1 DRILL DRLG P BOBO, 1.8 bpm at 5,493 psi, 14,920.0 14,960.0 18:27 19:57 BHP=3,975, WHP=41, IA=O, OA=600, CTSW=10 k, DHWOB=2.7 k, ROP=22 fifth 8/25/2017 8/25/2017 1.00 PROM DRILL WPRT P Wiper up hole to 13,960'(1000), PUW 14,960.0 14,960.0 19:57 20:57 43 k 8/25/2017 8/26/2017 3.05 PROD1 DRILL DRLG P BOBO, 1.8 bpm at 3,972 psi FS, 14,960.0 14,994.0 20:57 00:00 BHP=4,024, WHP=O, IA=O, OA=605, CTSW=11.6 k, DHWOB=2.8 k,. ROP=2 fph, TO lateral 8/26/2017 8/2612017 1.50 PROM DRILL WPRT P Pump 10x10 sweep, perform swab 14,994.0 12,944.0 00:00 01:30 wiper, PUW 44 k 8/26/2017 8/26/2017 1.15 FROM DRILL WPRT P Notice increase of 600 psi diff while 12,944.0 12,577.0 01:30 02:39 wiper up hole thru build section, RBIH, turn TF 180° from drilled TF, diff is lower, perform 7 clean out passes, no change, continue wiper up hole lhm window to 12,596', 8/2612017 8/26/2017 2.00 PROD1 DRILL WPRT P Perform static pressure survey, 11.7 12,577.0 78.2 02:39 04:39 ppg (3,700 psi annular), Open EDC, POOH pumping max rale, filling trip sheet 8/26/2017 8/26/2017 0.50 PROD1 DRILL TRIP P Tag up at surface, inspect INJH, reset 78.2 78.0 04:39 05:09 counters. 8/26/2017 8/26/2017 2.80 FROM DRILL TRIP P Trip in hole, EDC open, Pumping 78.0 12,595.0 05:09 07:57 8/26/2017 8/26/2017 0.10 PROD1 DRILL DLOG P Log K1 for+5.5, PUW=44K, Close 12,595.0 12,631.0 07:57 08:03 EDC 8/26/2017 8/26/2017 1.70 PROM DRILL TRIP P Continue in hole, clean through 12,631.0 14,960.0 08:03 09:45 window, Initial tag up @ 14960. Worked down to 14992. PUH waiting on beader liner pill. Hard time getting back in past 14960'. Call that bottom 8/26/2017 8126/2017 3.10 FROM DRILL TRIP P Trip out pumping 12.OPPG beaded 14,960.0 98.0 09:45 12:51 liner running pill followed with 12 PPG completion fluid. Paint EOP flags 13150 & 10800' 8/26/2017 8/26/2017 0.30 PROD1 DRILL PULD P At surface, PJSM lay down BHA on 98.0 98.0 12:51 13:09 dead well, Flow check well - good 8/26/2017 826/2017 1.10 PROM DRILL PULD P Break off injector anf skid back, Lay 98.0 0.0 13:09 14:15 down BHA#18 826/2017 8/26/2017 0.70 COMPZ1 CASING RURD P PJSM, R/U to run liner, service 0.0 0.0 14:15 14:57 elevators and top drive 8/26/2017 8/26/2017 4.25 COMM CASING PUTB P WU BHA #19 with non ported 0.0 1,763.2 14:57 19:12 bullnose, 3 pup joints, Ms slotted liner, 2 tracers T-165 & T940, 40 Jts slotted liner, Aluminum liner top billet 8/26/2017 8/26/2017 2.50 COMM CASING RUNL P Test BHI Coiltrak tools (good lest), tag 1,763.2 12,607.0 19:12 21:42 up, reset counters, RIH 8/26/2017 8/26/2017 0.15 COM Zi CASING RUNL P EOP flag, no correction, PUW 42 k 12,607.0 12,607.0 21:42 21:51 8/262017 8/26/2017 0.50 COMPZI CASING RUNL T Tighten Coupler on INJH 12,607.0 12,607.0 21:51 22:21 8/26/2017 8/2612017 1.00 COMPZI CASING RUNL P Continue IH, RIHCTSW=12 k, 12,607.0 14,994.0 22:21 23:21 RIHDHWOB=O k Page 20151 Report Printed: 9/2712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time log Start Depth start Tine Etd Terre Dur(hd Phase Op Code Adi"Code Time P -TA Opetalion (fli End Depth(WB) 8/26/2017 8126/2017 0.15 COMPZ1 CASINO RUNL P Tag bottom at 14,996', PUW 51 k, 14,994.0 13,230.4 23:21 23:30 CTSW=51 k, DHWOB=minus 5.6 k, set back down, bring pump up to 1.7 bpm, 0.80 bpm rertums, PUH, CTSW=38 k, DHWOB= 0 k, release liner on bottom. 8/26/2017 8/27/2017 0.50 COMPZI CASING TRIP P Remove liner length from BHA, POOH 13,230.4 9,945.0 23:30 00:00 8/27/2017 8/27/2017 1.25 COMPZ1 CASING TRIP P Continue POOH wtih liner setting 9,941.0 44.2 00:00 01:15 tools, pumping 1.0 bpm at 2,288 psi 8127/2017 8/27/2017 0.50 COMPZI CASING OWFF P At surface, check well for flow ( no- 44.2 44.2 01:15 01:45 flow), PJSM 8/27/2017 812712017 0.50 COMPZI CASING PULD P LD liner setting tools BHA# 19 44.2 0.0 01:45 02:15 8/27/2017 8/27/2017 0.50 PROD2 STK PULD P PU/MU kickoff/drilling BHA# 20 0.0 78.3 02:15 02:45 w/Hycalog C1 bi-center bit and agitator, surface test BHI Coiltrak tools (go test) 8/27/2017 8/27/2017 1.50 PROD2 STK TRIP P Tag up, reset counters, RIH, pumping 78.3 6,480.0 02:45 04:15 min rate 8/27/2017 812712017 0.50 PROD2 STK CTOP T Tighten INJH coupler 6,480.0 6,480.6- 04:15 04:45 8/27/2017 8/27/2017 0.90 PROD2 STK TRIP P Continue RIH 6,480.0 12,595.0 04:45 05:39 8/27/2017 8/27/2017 0.20 PROD2 STK DLOG P Log K1 correction of+5.5 12,595.0 12,620.0 05:39 05:51 8127/2017 8/27/2017 0.10 PROD2 STK TRIP P Continue in well 12,620.0 12,700.0 05:51 05:57 8/27/2017 8127/2017 1.70 PROD2 STK CIRC P Displace well back to 8.8 PPG 12,700.0 12,700.0 05:57 07:39 PwrPro, close EDC, PUW=46K 8/27/2017 8/2712017 0.50 PROD2 STK TRIP P Continue in well, Clean pass through 12,700.0 13,232.0 07:39 08:09 window, Dry tag liner top billet @ 13232 8/27/2017 8127/2017 0.70 PROD2 STK MILL P PUH, Bring on pumps @ 1.76 BPM @ 13,232.0 13,233.0 08:09 08:51 5350 PSI FS, BHP=3940. See motor work and DHWOB @ 13232, Mill @ 1FPH 8/2712017 8/27/2017 0.60 PROD2 STK MILL P Go to 2 FPH time milling 13,233.0 13,234.0 08:51 09:27 8/2712017 8/2712017 0.40 PROD2 STK MILL P Go to 3 FPH time milling 13,234.0 13,235.0 0927 09:51 812712017 8/27/2017 0.80 PROD2 DRILL DRLG P 12235', Start drilling ahead, Had one 13,235.0 13,270.0 09:51 10:39 stall, reset and drill, 1.75 BPM @ 5350 PSI FS, BHP=3873 8/27/2017 8/2712017 0.20 PROD2 DRILL WPRT P PUH to dry drift billet area, Set down 13,270.0 13,270.0 10:39 10:51 @ 13237, PUH then run through clean 8/27/2017 8/27/2017 3.40 PROD2 DRILL DRLG P 13270', Drill, 1.73 BPM @ 5400 PSI 13,270.0 13,660.0 10:51 14:15 FS, BHP=3927 8/27/2017 8/27/2017 0.40 PROD2 DRILL WPRT P 13660, Wiper to 13250, PUW=44K 13,660.0 13,660.0 14:15 14:39 8/27/2017 8/27/2017 1.00 PROD2 DRILL DRLG P 13660', Drill, 1.73 BPM @ 5680 PSI 13,660.0 13,722.0 14:39 15:39 FS, BHP=4022 8/27/2017 8/27/2017 0.15 PROD2 DRILL WPRT P PUW 45 k, BHA wiper 13,722.0 13,722.0 15:39 15:48 8/27/2017 8/27/2017 5.00 PROD2 DRILL DRLG P BOBD, 1.74 bpm at 5,681 psi FS, 13,722.0 14,064.0 15:48 20:48 BHP=5,562, WHP=9, IA=O, OA=528, CTSW=4.5 k, DHWOB=2.2 k, ROP=42 fph Page 21151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stat Depth stat Tme End Time Dar" Phase op cotle Activity Cee Time P -T -X Operation (M) EM Depth (W(9) 8/27/2017 8/27/2017 0.75 PROD2 DRILL WPRT P Wiper up hole to 13,300', PUW 44 k, 14,064.0 14,064.0 20:48 21:33 wiper back in hole, RIW=6 k 8/27/2017 8/28/2017 2.45 PROD2 DRILL DRLG P BOBD, 1.79 bpm at 6,045 psi FS, 14,064.0 14,212.0 21:33 00:00 BHP 4,074, WHP 8, IA=O, OA=528, CTSW=minus 1 k, DHWOB=1.5 k, ROP=90 fph "' 14,187', OHWOB=3.5 k, CTSW=2.5 k, ROP=O, PUW 50 k, stack back down minus 15 k, PUW 72 k, pipe free, pull 200' wiper 8/28/2017 6/28/2017 1.75 PROD2 DRILL DRLG P OBD, 1.73 bpm at 6,430 psi, BHP 14,212.0 14,318.3 00:00 01:45 4074, WHP 0, IA 0, OA 532, CTSW= minus 1.7 k, DHWOB=2.2 k, ROP=55 k 8/28/2017 8/28/2017 0.25 PROD2 DRILL WPRT P Short Wiper up hole to 14,159'. PUW 14,318.3 14,318.0 01:45 02:00 42 k, HOT was against the stops, rotate TF 8/28/2017 8/28/2017 1.50 PROD2 DRILL DRLG P BOBD, 1.74 bpm at 5,319 psi, BHP 14,318.0 14,460.0 02:00 03:30 4,178, WHP 0, IA 0, OA 539, CTSW=6 k, DHWOB=1.3 k, ROP=110fph "' New Mud at the bit 14,3331 ................ Old Mud Stats: 1,931' DF, 0.9% DS 8/28/2017 8/28/2017 0.75 PROD2 DRILL WPRT P Wiper up hole for lie in, PUW 44 k 14,460.0 12,735.0 03:30 04:15 8/28/2017 8/28/2017 0.15 PROD2 DRILL DLOG P Log the RA correction of plus 5.5' 12,735.0 12,753.0 04:15 04:24 8/28/2017 8/28/2017 0.70 PROD2 DRILL WPRT P RIH, RIW 11 k 12,753.0 14,460.0 04:24 05:06 8/28/2017 8/28/2017 3.80 PROD2 DRILL DRLG P BOBO, 1.75 bpm at 5595 PSI FS, 14,460.0 14,700.0 05:06 08:54 BHP=4039, Pump 10 BBI beaded pill to evaluate weight transfer @ 14692. No difference. Surface weight @ -5K 8/28/2017 8/28/2017 3.90 PROD2 DRILL DRLG P 14700, Drill aheadl.7 BPM @ 5595 14,700.0 14,860.0 08:54 12:48 PSI FS, BHP=4120 8/28/2017 8/28/2017 0.90 PROD2 DRILL WPRT P 14860', 1000' wiper, PUW=45K 14,860.0 14,860.0 12:48 13:42 8/28/2017 8/28/2017 0.60 PROD2 DRILL DRLG P 14860', Drill, 1.7 BPM @ 6096 PSI 14,860.0 14,882.0 13:42 14:18 FS, BHP=4099. Pressure is high across BHA. Circ pressure up 500 PSI. Reduce rate to 1.6 BPM @ 5740 PSI FS 8/28/2017 8/28/2017 2.80 PROD2 DRILL TRIP T 14882, Lost differential pressure on 14,882.0 77.0 14:18 17:06 bottom, Trip out 8/28/2017 8/28/2017 1.90 PROD2 DRILL PULD T PUD BHA #20, Scope change, Floats 77.0 0.0 17:06 19:00 not holding. Power up coiltrak and closed EDC. Continue pressure undeploy 8/28/2017 8/28/2017 0.80 PROD2 DRILL CTOP T M/U agitator to coil. Stab on well. 0.0 0.0 19:00 19:48 circulate through agitator. .5 BPM @ 1605 PSI with .5BPM out. Unstab injector and lay down agitator 8/28/2017 8/28/2017 0.40 PROD2 DRILL BOPE P Perform Bi -weekly BOPE function test 0.0 0.0 19:48 20:12 1 - Good 8/28/2017 8/28/2017 1.80 DRILL PULD T PD pre loaded BHA # 21 with .6° 0.0 62.6 20:12 22:00 rOD2 motor, Re run bi center. No res tool or agitator, Surface test tool - Good. Page 22151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log scan Depth SW Time End Time ow(Iv) Phase op Cott. Ad,*Code Time P -T -x operafion (PoB) EM Depth (WB) 8/28/2017 8/28/2017 1.50 PROD2 DRILL PULD T Identified hydraulic leak on lower 62.6 0.0 22:00 23:30 shear / seal actuator, PJSM, PUD BHA #21, Nabors Tool Pusher dispatched mechanic to repair acctuator. 8/28/2017 8/29/2017 0.50 PROD2 DRILL EQRP T Prep for hydraulic leak repair, vac out 0.0 0.0 23:30 00:00 fluid in slack, lockout/tagout koomey unit. 8/29/2017 8/29/2017 2.50 PROD2 DRILL EQRP T Continue repairing leak on lower blind 0.0 0.0 00:00 02:30 shear ram actuator ***Total Nabors NPT 4.5 me 8/29/2017 8/29/2017 1.15 PROD2 DRILL PULD T PJSM, PD drilling BHA# 21 0.0 62.5 02:30 03:39 8/2912017 8/29/2017 2.25 PROD2 DRILL TRIP T RIH, with cleanout/confirm TD BHA# 62.5 12,595.0 03:39 05:54 21 with a 0.6° ako motor and no res tool. 8/29/2017 8/29/2017 0.15 PROD2 DRILL DLOG T Log K1 marker correction of plus 5.5' 12,595.0 12,621.0 05:54 06:03 8/29/2017 8/29/2017 1.00 PROD2 DRILL TRIP T Continue RIH 12,621.0 14,882.0 06:03 07:03 8/29/2017 8/29/2017 0.50 PROD2 DRILL CIRC P Confirm TD, line up and pump liner 14,882.0 14,882.0 07:03 07:33 pill, jogging pipe close to bottom 8/29/2017 8/29/2017 3.00 PROD2 DRILL TRIP- P POOH while laying in 12.0 ppg liner 14,882.0 62.2 07:33 10:33 running pill with alpine beads, PUW 44 k, painting EOP flags 8/29/2017 8/29/2017 0.50 PROM DRILL OWFF P At surface, check well for flow (no- 62.2 62.2 10:33 11:03 flow), PJSM 8/29/2017 8/29/2017 0.50 PROD2 DRILL PULD P LD cleanout/confirm TD BHA# 21 on a 62.2 0.0 11:03 11:33 dead well 8/29/2017 8/29/2017 0.25 COMM CASING PUTS P Prep rig floor for PU liner assembly, 0.0 0.0 11:33 11:48 PJSM 8/29/2017 8/29/2017 3.25 COMPZ2 CASING PULD P MU AL1 Liner assembly, check BHI 0.0 1,710.5 11:48 15:03 _ check valves and pac-offs 8129/2017 8/29/2017 0.75 COMPZ2 CASING PULD P PU/MU BHI CoilTrak tools, surface 1,710.5 1,776.3 15:03 15:48 test tools (good test) 8/29/2017 8/29/2017 2.40 COMM CASING RUNL P RIH, with ALU liner assmebly BHA# 22 1,776.3 12,573.0 15:48 18:12 8/29/2017 8/29/2017 0.90 COMPZ2 CASING RUNL P Wt Check 43 k lbs, tie into window flag 12,573.0 14,597.0 18:12 19:06 for 2.42' correction. continue to RIH. SD @ 14,597', PU 52 k lbs, -10.9 k - WOB, continue to RIH. 8/29/2017 8/29/2017 0.10 COMPZ2 CASING RUNL P tie into flag while driving by for no 14,597.0 14,882.0 19:06 19:12 corection. SD @ 14883', stacked - - 10k CT wt 2.6 k WOB 2.78k lbs. stage pump up to 1.5 bpm, CT 4321 psi. PU,Ct wt broke over at 38k lbs, WOB-3.471k lbs. Released liner.bottom 14882' TOB 13150. . 8/29/2017 829/2017 1.90 COMM CASING TRIP P Reset counters, POOH replacing pipe 14,882.0 70.0 19:12 21:06 voydage w KW. Open EDC once in caseed hole. continue to POOH. 8/29/2017 8/292017 0.70 COMPZ2 CASING PULD P PJSM, at surface, flow check - Good, 70.0 0.0 21:06 21:48 unstab injector, Examine pipe, flat spot -24' back 0.13", @ - 17' back 0.90". Decision matte to cut pipe I rehead. LD BHA # 22 over a dead well. Page 23151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stall Tsne End Time DW thr) Phase op Code Ar Oty Code Time PJA Operation (WB) end Depth(ftKa) 829/2017 8/30/2017 2.20 COMPZ2 CASING CTOP P Cut 30' of pipe and rehead, pull test to 0.0 0.0 21:48 00:00 38k lbs - good, install upper Quick, PT to 4k psi - good. 8/302017 8/30/2017 1.20 PRODS STK PULD P PJSM, PU and deploy BHA #23, AL2 0.0 70.0 00:00 01:12 tat drilling assembly, over a dead well. Stab injector, bump up, set counters 8/30/2017 8/30/2017 2.60 PRODS STK TRIP P RIH, shallow lest agitator, came on 70.0 12,595.0 01:12 03:48 above 1 bpm, open EDC, continue to RIH. Baker drilling screen jumped from - 7000 feet to 13,000 feet for no known reason. MWD cycled equipment and reset depths. 8/30/2017 8/30/2017 0.20 PRODS STK DLOG P Tie into K1 for+4' correction 12,595.0 12,633.0 03:48 04:00 8/30/2017 8/30/2017 1.25 PRODS STK DISP P Pull above TOC, open EDC, circ out 12,633.0 12,633.0 04:00 05:15 12.0 kill weight fluid. 8130/2017 8/3012017 0.25 PRODS STK TRIP P RIH, dry tag TOB at 13,150', PUH, 12,633.0 13,150.0 05:15 05:30 1 PUW 37 k 8/30/2017 8/30/2017 2.50 PRODS STK KOST P Bring pump on 1.81 bpm at 5,215 psi, 13,150.0 13,157.0 05:30 08:00 BHP 3,966, WHIP 8, IA 0, OA 334, CTSW=12 k, DHWOB=0.4 k, kickoff billet as per RP, Dry drift billet area _ clean 8/30/2017 8/3012017 4.50 PRODS DRILL DRLG P Drilling ahead, 1.8 bpm at 5,565 psi, 13,157.0 13,484.0 08:00 12:30 BHP 3,988, WHIP 0, IA 0, OA 417, CTSW=7 k, DHWOB=2.6 k, ROP=80- 120 fph 8/30/2017 8/30/2017 0.50 PROD3 DRILL WPRT P Wiper up hole to 12,750', PUW 50 k 13,484.0 12,750.0 12:30 13:00 8/30/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper back in hole, RIW 7 k 12,750.0 13,484.0 13:00 13:30 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P BOBO 1.8 bpm at 5,235 psi FS, BHP 13,484.0 13,700.0 13:30 16:30 3,959. WHIP 0, IA 0, OA 454, CTSW=3.6 k, DHWOB=2.6 k, ROP=40 fah 8/30/2017 8/30/2017 1.50 PRODS DRILL DRLG P OBD 1.8 bpm at 5,377 psi, BPH 13,700.0 13,795.0 16:30 18:00 4,043, WHIP 0, IA 0, OA 485, CTSW=7 k, DHWOB=1.9 k, ROP=33 fph 8/30/2017 8/30/2017 2.20 PRODS DRILL DRLG P OBD stall, PU Wt 52 k ran iton 13,795.0 13,875.0 18:00 20:12 something hard, ROP down to - 3 ft/hr, low diff, WOB - 3 k lbs, 1381 1'started to drill off, getting diff presure back. ROP increased after 13,814', caught bottoms up sample, -. lots of siderite 6/30/2017 8/30/2017 0.30 PRODS DRILL WPRT P PU Wt 43 k lbs, Geo wiper, believe we 13,875.0 13,660.0 20:12 20:30 crossed fault, 8/30/2017 8/3012017 0.30 PRODS DRILL WPRT P RBIH, S/D 13,810', short PU an, 13,660.0 13,875.0 20:30 20:48 rolled toolface to as drilled- 310 ROHS, SO again 13,816', 3 k Ibs, short Pu clean, RBIH still 330'ROHS, reduced rate to 0.3 BPM, slid right through. Page 24151 Report Printed: 91272017 Operations Summary (with Timelog Lfepths) 3M-27 NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log StaM1 Oeptn sbh Time EM Time Our (hr) Phase Op Cod. Activity Code Time P -T -X OpemUon ^13) End Depth (MB) 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P 1.79 bpm in, 1.70 bpm out, Ct 5350 13,876.0 13,971.0 20:48 23:48 psi, free spin diff 1000 psi, CT RIH wt 9k. OBD, WOB 1.5 k lbs, CT wt 6.5 k lbs, ROP 30 ft/hr. Pumped 5 x 5 sweep pre wiper tirp CT wt -2.9 k lbs, 1 k lbs WOB, ROP 45 ft/hr 8/30/2017 8131/2017 0.20 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2-770' 13,971.0 13,512.0 2348 00:00 chasing sweeps uphole. 8/31/2017 8/31/2017 0.10 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2-770' 13,512.0 13,200.0 00:00 00:06 chasing sweeps uphole. 8/31/2017 8/31/2017 0.30 PRODS DRILL WPRT P RBIH, RIH Wt 7 k lbs, RIH Wt 8 k 13,200.0 13,971.0 00:06 00:24 8/31/2017 8/31/2017 3.80 PRODS DRILL DRLG P 1.81 bpm in, 1.72 bpm out, Ct 5480 13,971.0 14,078.0 00:24 04:12 psi, free spin diff 1010 psi OBD, CT wt 4 k lbs, WOB 2 k lbs. ROP 58 It/hr. Excess surface weight short lived. CT weight fell to -3 k lbs w 2 k WOB in 20 min, ROP 30-15 ft/ hr 8/31/2017 8/31/2017 0.20 PRODS DRILL WPRT P PU Wt 42 k lbs, Wipe 100' 14,078.0 14,078.0 04:12 04:24 8/31/2017 8/31/2017 2.00 PROD3 DRILL DRLG P 1.82 bpm in, 1.78 bpm out, CT wt 6 k 14,078.0 14,111.0 04:24 06:24 lbs, WOB 1.8 k lbs. CT weight fell . quicly to 4 klbs. ROP -16 f 1hr 8/31/2017 8/31/2017 0.15 PRODS DRILL WPRT P BHA wiper PUW 47k 14,111.0 14,111.0 06:24 06:33 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P BOBD, 1.8 bpm at 4,886 psi, BHP 14,111.0 14,189.0 06:33 10:48 4,093, WHIP 0, IA 0, OA 567, CTSW= minus 5 k, DHWOB=1.8 k, ROP 15 fph, start new mud down coil 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,950 psi, BHP 14,189.0 14,280.0 10:48 15:03 3,965, WHIP 0, IA 0, OA 568, CTSW= minus 5.9 k, DHWOB=1.3 k, ROP 15- 28 fph "' New mud at the bit 14,189' 8/31/2017 8/31/2017 0.75 PRODS DRILL WPRT P Wiper up hole for tie in. PUW 45 k, 14,280.0 12,595.0 15:03 15:48 14,100' pull heavy 73 k 8/31/2017 8/31/2017 0.15 PRODS DRILL DLOG P Log the K1 correction of plus 7.5', seat 12,595.0 12,626.0 15:48 15:57 pump 8/31/2017 8/31/2017 1.00 PRODS DRILL WPRT . P RBIH, Work through tight area @ 12,626.0 14,270.0 1557 16:57 14,100 8/31/2017 8/31/2017 0.70 PRODS DRILL WPRT T PU to clean up tight section. Stuck 14,270.0 12,691.0 1657 17:39 multiple times 14,100- 14,000'. Stack negative down, Pull 75 fUmin, up to 78k surface. weight, 44 k was clean pick up. Able to pull free . Pump multiple 5x5 sweeps. Weights clenaed up above the fault @ 13,800. Page 25151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Oepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sw Depth SM Tune EMNre Dur(hr) Phase Op Code Ac dy Cade Tn.P-T-X operetlan (ftKa) EM Depth (WS) 8/31/2017 8/31/2017 1.00 PRODS DRILL CIRC T Open EDC, pumping 1.84 bpm, as the 12,691.0 12,670.0 17:39 18:39 bottoms up landed from when we wer stuck large amounts of cuttings returned to the shaker. No rocks, all fines. All twenty valleys on the shaker full to the top. Sweeps landed and solids returns were greatly deminished from previous. Pump two more sweeps timed out for clean out run. PU W144 k lbs. Close EDC 8/31/2017 8/31/2017 0.40 PRODS DRILL WPRT T RBIH, 12,670.0 13,807.0 18:39 19:03 8/31/2017 8131/2017 2.50 PRODS DRILL WPRT T Pu Wt 45k lbs, Pull out of hole wiping 13,807.0 78.0 19:03 21:33 to the window chasing sweeps to surface. Open EDC. Contiue out of hole chasing sweeps. Called our Baker tool hand w billet and open hole anchors 8/31/2017 8/3112017 1.50 PRODS DRILL PULD T Bump up, PUD BHA# 23. 78.0 0.0 21:33 23:03 8/31/2017 911/2017 0.95 PRODS STK PULD T PU & PD BHA #24 0.0 78.0 23:03 00:00 911/2017 9/1/2017 1.50 PROD3 STK PULD T Crew Change, PJSM, contiune to PU 0.0 78.0 00:00 01:30 & PD BHA #24 9/1/2017 9/1/2017 2.90 PRODS STK TRIP T Bump up, set counters, RIH w 78.0 12,610.0 01:30 04:24 1 anchored billet. 9/1/2017 9/1/2017 0.20 PRODS STK DLOG T Tie into the K1 for +6' correction 12,607.0 12,633.0 04:24 04:36 9/1/2017 911/2017 0.70 PROD3 STK TRIP T Pu Wt 42 k lbs, SID pumps, close 12,633.0 13,347.0 04:36 05:18 EDC. Continue to RIH, SID multiple times 13,272', 3k lbs bounced through 13,329', 3k lbs bounced through 13,347', 4.6 k PU W144 k 20-25 ft/min 13,3471, 4.8 k PU Wt 48 k 13,347', 4 k PU Wt 50 k Orient slip to as drilled, 240° ROHS SID 13,345'3k PU Wt 48k 9/1/2017 9/1/2017 0.40 PRODS STK TRIP T PUH, 13,347.0 12,669.0 05:18 05:42 9/1/2017 9/1/2017 0.75 PRODS STK WAIT T Open EDC, maintain bottom hole 12,669.0 12,562.0 05:42 06:27 pressure. while creeping up hole, wail on orders for new settimg depth 9/1/2017 9/112017 0.35 PRODS STK TRIP T Close EDC, RIH notice counters not 12,562.0 12,562.0 06:27 06:48 working, RIH for lie in 9/1/2017 9/1/2017 0.25 PRODS STK DLOG T Log the Ki correction of plus 36.5' 12,562.0 12,642.0 06:48 07:03 9/1/2017 9/1/2017 0.50 PRODS STK WAIT T Confer with town team on billet setting 12,642.0 12,642.0 07:03 07:33 depth 9/1/2017 9/112017 3.25 PRODS STK TRIP T POOH, for cleanout run, @ 500' PJSM 12,642.0 73.3 07:33 10:48 for PUD Billet BHA# 24 9/112017 9/1/2017 1.25 PRODS STK PULD T PUD, Billet BHA# 24 73.3 0.0 10:48 12:03 9/1/2017 9/1/2017 0.75 PRODS DRILL WAIT T Wait on Concretion Bit vialKDTH 0.0 0.0 12:03 12:48 9/112017 9/1/2017 1.25 PRODS DRILL PULD T PJSM, PD cleanout/drill BHA# 25 0.0 78.2 12:48 14:03 Page 26151 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 1W Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depm SMTIM End Tmie Dur(hr) Phase op cele AdK*Code Time P -T -X operation (ftKB) EM Depth (WB) 9/1/2017 9/1/2017 2.50 PROD3 DRILL TRIP T RIH, w/cleanout BHA# 24 78.2 12,600.0 14:03 16:33 9/1/2017 911/2017 0.20 PROD3 DRILL DLOG T Tie into the K1 for a +5.5' correction 12,600.0 12,630.0 16:33 16:45 9/1/2017 9/1/2017 0.40 PROD3 DRILL TRIP T Wt Ck 40 k Itis, coninue to RIH 12,630.0 13,300.0 16:45 17:09 9/1/2017 9/1/2017 0.70 PRODS DRILL REAM T 1.80 bpm, Ct 4800 psi, free spin diff 13,300.0 13,819.0 17:09 17:51 830 psi. SID @ 13,819' stack weight w motor work. PU 43 k lbs, sticky, started 5x5 sweep. RBIH 9/1/2017 9/1/2017 0.20 PRODS DRILL REAM T 1.80 bpm, CT 4861, psi, free spin 819 13,819.0 13,700.0 17:51 18:03 psi, RIH wt 10 k lbs Tag up 13,813', work at 3 fUmin to 13,828' PU 40k lbs, some neg WOB, motor work Crew change 9/1/2017 9/1/2017 1.60 PRODS DRILL REAM T RBIH SID @ 13,814 drilled off, 13,700.0 13,837.0 18:03 19:39 continue to RIH, pumping 5x5 sweeps one in as one exits the nozzle. Drill to 13,830'3+ k WOB, PU 47k wipe to above the fault, lots of silt at the shaker RBIH, SID at 13,814 work past, 13,834' hard bottom +3 k WOB, Work slowly to 13,837, +3k WOB, PU 58 k, wipe to above fault, RBIH Consult w/ town. Scope change to prep for billetlopen hole side track 911/2017 9/1/2017 0.60 PROD3 DRILL WPRT T PU 47k, PUH as 5x5 sweep exiting 13,837.0 12,550.0 19:39 20:15 the nozzle, to above TOC, questions re. TOC in tubing, under reamed from 12,559' up (tagged w underreamer @ 12,569') and drilled pilot hole from 12,588 down. Open EDC, 9/1/2017 9/1/2017 0.90 PROD3 DRILL CIRC T Increase rate to 2.22 bpm, watch two 12,550.0 12,606.0 20:15 21:09 sweeps land on the shaker, solids greatly reduced on the second. Loaded another 5x5 sweep in the coil _ land closed EDC 911/2017 9/1/2017 0.20 PROD3 DRILL DLOG T Log K1 for+5.5' correction 12,606.0 12,628.0 21:09 21:21 9/1/2017 9/1/2017 0.20 PROD3 DRILL WPRT T RIH pumping sweeps. 12,628.0 13,700.0 21:21 21:33 9/1/2017 911/2017 0.80 PRODS DRILL WPRT T Pu Wt 39 k lbs, PUH slowly timing out 13,700.0 12,550.0 21:33 22:21 sweeps. continue to POOH chasing sweeps to surface. Saw slightibrief motor work @ 12,780' just below the window, RBIH, PUH, clean. Park and open EDC. 9/1/2017 9/2/2017 1.65 PROD3 DRILL WPRT T Continue to POOH pumping 2.27 bpm 12,550.0 3,400.0 22:21 00:00 9/212017 9/2/2017 0.80 PRODS DRILL WPRT T Continue to POOH pumping 2.27 bpm 3,400.0 83.0 00:00 00:48 9/212017 9/2/2017 1.30 PRODS DRILL PULD T Tag up, space out, PJSM, PUD & LD 83.0 0.0 00:48 02:06 BHA #25. 9/2/2017 9/2/2017 1.30 PROD3 STK PULD T PU & PD BHA # 26, anchored billet, 0.0 83.0 02:06 03:24 check pack offs - replace. Page 27151 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stat Dept, SfsrtTme End Time Dia (hr) Phase Dip Code Ad Ay Cade Time PJA Operaton (NCe) End Depth (NCB) 9/2/2017 9/212017 2.45 PRODS STK TRIP T RIH 83.0 12,610.0 03:24 05:51 9/2/2017 9/2/2017 0.15 PRODS STK DLOG T Log the K1 correction plus 9 ft 12,610.0 12,624.0 05:51 06:00 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Continue RIH 12,624.0 13,374.0 06:00 06:15 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Small bobble @ 13,347', set down 3 13,374.0 13,374.0 06:15 06:30 times, setting down 4 k=DHWOB, PUW=48 k, 9/2/2017 9/2/2017 0.50 PRODS STK WAIT T Call Town Engineer, for plan forward. 13,374.0 13,498.0 06:30 07:00 decision was made to attempt to push past ledge/debris in hole, set down 4.7 k, PUW=52, RBIH @ 40 fpm, popped thru, Continue RIH 9/2/2017 912/2017 1.00 PRODS STK TRIP T Continue RIH, set down 4.7 k, 13,498.0 13,498.0 07:00 08:00 PUW=52 k, try and work billet down 13 times, setting down 4-6 k, max PUW= 60 k (sticky), max set down weight 6.5 k DHWOB, AP=dropping to 3,342 psi, bring annular pressure back up to MP 4,058 psi with no success in getting past 13,498' 9/2/2017 9/2/2017 0.25 PRODS STK WPST T Call Town Engineer, plan forward set 13,498.0 13,475.0 08:00 08:15 Estimated TOB at 13,475', Anchor set @ 30 ROHS. Bring pump up to 4,241 psi, tool shifted showing 1.7 k DHWOB, set down additional 1.5 k, PUW=47 k 9/2/2017 9/2/2017 2.50 PROD3 STK WPST T POOH, pumping 1.0 bpm at 2773 psi, 13,475.0 73.3 08:15 10:45 filling in trip sheet, PJSM @ 750' from surface 9/2/2017 9/2/2017 1.15 PRODS STK PULD T Tag up at surface, space out, PUD & 73.3 0.0 10:45 11:54 LD BOT Seting tools 9/2/2017 9/2/2017 1.25 PRODS STK PULD T PD kickoff/drilling BHA# 27 0.0 78.3 11:54 13:09 9/2/2017 9/2/2017 0.50 PRODS STK SVRG P PJSM, w/crew and Hydra-Rig rep, 78.3 78.3 13:09 13:39 measuring goose neck A- frame..... When stabbed on to stump. 9/2/2017 9/2/2017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH following 78.3 12,610.0 13:39 15:39 MP schedule, filling trip sheet every . 1000', test agitator at 308', (working) 9/2/2017 9/2/2017 0.25 PRODS STK DLOG T Log the K1 marker correction of plus 12,610.0 12,620.0 15:39 15:54 4.5', PUW=40 k 9/2/2017 9/2/2017 0.35 PRODS STK TRIP T Continue RIH, RIW=13 k 12,620.0 13,480.0 15:54 16:15 9/2/2017 9/2/2017 2.00 PRODS STK KOST T Dry tag TOB, bring pump up to 1.8 13,480.0 13,483.0 16:15 18:15 bpm at 5,238 psi FS, BHP 3,968, WHIP 0, IA 0, OA 253 9/2/2017 9/2/2017 0.90 PRODS STK KOST T 1.80 bpm, targeting 0.5-1k WOB, 13,483.0 13,495.0 18:15 19:09 @ 13,483' ROP 3 ft/hr, WOB -.66k lbs @ 13,485' increased ROP to 5.5 ft/hr - WOB 0.8 k lbs @ 13,486 increased ROP to 12 Whir - WOB 0.3 k lbs @13,487' chasing it, 15 ft/min, WOB 1 k lbs Page 28151 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth start Time EndTme OW(hf) Phase Op code AdlJ%*Code TimeP-T-x Operation (WB) End Depth (flKB) 9/212017 9/2/2017 0.40 PROD3 STK TRIP T Drilling ahead, 130-30 ft/hr, lost depth 13,495.0 13,508.0 19:09 19:33 tracking. •' Note WOB started falling off at 19:19 right when the depth counter apears to have failed. 9/2/2017 9/2/2017 1.10 PRODS STK TRIP T PU 38k lbs, mechanical @ 13,444', 13,508.0 12,734.0 19:33 20:39 jog slowly in 10 foot interval. Effect repair and pull slowly up hole, reduce pump rate "best guess' where we think TOB is. Bring rale back up continue up hole logging to RA tag. See pip tag on the drive by 9/2/2017 9/2/2017 0.20 PROD3 STK DLOG T RBIH log RA tag for+7' correction 12,734.0 12,753.0 20:39 20:51 9/2/2017 9/2/2017 0.20 PROD3 STK TRIP T RIH, 12,753.0 13,497.0 20:51 21:03 9/2/2017 9/212017 0.40 PROD3 STK DLOG T SID @ 13,497, PU, RBIH, bounce 13,497.0 13,598.0 21:03 21:27 through. Continue to RIH logging from 13,508 down. Drive past suspect bottom, park at 13,532' survey- suspect in original hole. reduce pumps to min rate attempt to tag bottom. Survey @ 13,564'same results, in old hole Tum around at 13,598' 9/2/2017 9/2/2017 1.20 PROD3 STK WPRT T Pump 5x5 sweep, PU, POOH toward 13,598.0 12,544.0 21:27 22:39 the window wiping hole. Pump another 5x5 sweep Make 2 up down passes, LS on up, HIS on down from 13,430 - 13,300' in attempt to clean up the previous trouble spot. Continue to POOH. 9/2/2017 9/3/2017 1.35 PROD3 STK WPRT T Open EDC, POOH pumping 2.2 bpm 12,544.0 4,693.0 22:39 00:00 chasing sweeps. 9/3/2017 9/3/2017 1.30 PRODS STK WPRT T Continue to POOH. Packed off the 4,693.0 78.0 00:00 01:18 MM while tripping, bypass same and contiue out of hole. Jog near surface. 9/3/2017 913/2017 1.50 PRODS STK PULD T Bump up, space out, PUD, 78.0 0.0 01:18 02:48 "'Bit had 7 of 10 total side ( reaming ) cutters severely damaged '"'Bit graded 1-7 9/3/2017 9/3/2017 1.50 PRODS STK PULD T PU and PD BHA # 28, Aluminum billet 0.0 73.0 02:48 04:18 w open hole anchors, bump up, set counters, pumps on at min rate, 9/3/2017 9/3/2017 2.50 PRODS STK TRIP T RIH, close EDC, contiue to RIH 73.0 12,610.0 04:18 06:48 9/3/2017 9/312017 0.20 PROD3 STK DLOG T Tie into K1 for plus 4.0' Correction, 12,610.0 12,632.0 06:48 07:00 PUW 42 k 9/3/2017 9/3/2017 0.50 PRODS STK TRIP T Continue IH 12,632.0 13,426.0 07:00 07:30 9/3/2017 9/3/2017 0.25 PROD3 STK WPST T At depth, PUW=43 k, RBIH to 13,426.0 13,415.0 07:30 07:45 13426.8' PUH 39 k, bring pump online 0.45 bpm, tool sheared at 4,800 psi, 9/3/2017 9/3/2017 2.15 PROD3 STK TRIP T POOH, PJSM @ 750' from surface 13,415.0 61.2 07:45 09:54 Page 29151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sled Depth Sten Tone End TIM Dur(hr) Phase Op Cade Aatty Cade TM P -TX Opembon (W) End Deplh(ftKe) 9/3/2017 9/3/2017 0.80 PRODS STK PULD T PUD BOT setting tools 61.2 0.0 09:54 10:42 9/3/2017 9/3/2017 0.25 PRODS STK PULD T LD BOT tools 0.0 0.0 10:42 10:57 9/312017 9/3/2017 1.00 PRODS STK PULD T PU/MU AL2 kickoff/drilling BHA, 0.0 78.3 10:57 11:57 surface test tools (good -test) 9/3/2017 9/3/2017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH w/AL2 78.3 12,610.0 11:57 13:57 kickoff/driliing BHA# 29 9/3/2017 9/3/2017 0.15 PROD3 STK DLOG T Log K1 marker correction of plus 4.0' 12,610.0 12,716.0 13:57 14:06 9/3/2017 9/3/2017 0.50 PRODS STK TRIP T Continue IH 12,716.0 13,415.0 1406 14:36 9/3/2017 9/3/2017 2.00 PRODS STK KOST T Dry tag TOB, PUW 40 k, bring pump 13,415.0 13,425.0 1436 16:36 on-line 1.8 bpm at 5,124 psi, BHP 3,934, W HP 0, IA 0, OA 275, CTSW=11.3 k, DHWOB=0.15 k, Kickoff Billet as per RP, 20°ROHS 9/3/2017 9/3/2017 2.00 PRODS DRILL DRLG T Start drilling formation 1.8 bpm at 13,425.0 13,750.0 16:36 18:36 5,719 psi, BHP 3,932, WHP 0, IA 0, OA 386, CTSW=8 k, DHWOB=1.6 k, _ ROP 67 fph Stalled, PU and dry drifted billet clean PU @ 13,537' to get restarted, 43 K lbs BOBD 130-155 ft/hr, Pump 5x5 @ 13,672' drilling @ 150 ft/hr, Ct Wt Ok lbs, 1.73 k lbs Sweeps start exiting the nozzle @ 13,746', staged a 10 bbl Hi vis sweep in the coil to time out below the window. 9/3/2017 9/3/2017 1.70 PRODS DRILL WPRT T Pu, Wt 44 klbs 13,750.0 13,360.0 18:36 20:18 PUH chasing sweeps. Pull 50 k lbs @ 13,460, turn around, SID, PU, pump min rate, RBIH, S/D, PU, RBIH Bounce through, continue in hole 13,650, PU Wt, 44 k PUH @ 30 ft/min pumping 1.8 bpm, sweeps exit at 13,480'. Small neg WOB @ 13460'. tum around 13,438' RBIH @ 1.0 bpm. saw a little WOB spike at 13,4683, other than that clean PU 43k, PUH, saw a little neg WOB again @ 13,460' Pulled past billet, 44 k clean, saw 48 k CT wt as we drug by with a -1 k WOB spike. 9/3/2017 9/3/2017 2.50 PRODS DRILL TRIP T Continue to POOH. 13,360.0 74.0 20:18 22:48 Open EDC above TOC, increase pump rate from 1.8 to 2.2 bpm Continue to POOH 9/3/2017 9/4/2017 1.20 PROD3 DRILL PULD T Bump up, space out, PUD BHA #29, 74.0 0.0 22:48 00:00 UD same 9/4/2017 9/4/2017 0.40 PRODS DRILL PULD T Continue to lay down BHA #29 0.0 - 0.0 00:00 00:24 Page 30151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase op Code Acbvq Cetle Time P -TX Cpaauon (ftKB) End Depth (fi1<8) 9/4/2017 9/4/2017 3.60 PRODS DRILL RURD P Prep to test BOPS 0.0 - 0.0 00:24 04:00 PU nozzle, stab injector, jet stack, (rolling coil to fresh water while jetting stack). Un Stab injector, central shops grease tree valves, Nabors crew grease stack. and/choke valves, Test inner reel iron low/ high good. install night cap, 9/412017 9/4/2017 2.00 PRODS WHDBOP BOPE P PJSM, Flood up BOP stack, Start test 0.0 0.0 04:00 06:00 @ ( 4:00) Witness of lest by AOGCC - Bob Nobel. 250 psi low / 4200 psi High. test #1 Swab 2, - pass Test #2 Lower Blind shear, TV2 - pass Test #3 BOP TVI - Test #4 Upper blind shear, B1,&5 C4,5,8,&12, R1, bleeder 1 Test #5 C3,6,7,&11,82&6, T2 9/4/2017 9/4/2017 8.00 PRODS WHDBOP BOPE P Crew change, PJSM, contiue BOP 0.0 0.0 06:00 14:00 testing, sim-ops - replace coupler on motor #1, right angle drive motors on INJH, - BOP test Complete 14:00 (10 him TT), 2 faillpass, R3 grease and function (retest good) and Koomey # 1 accumulator pump failed, changed out contactor, (retest good) 9/4/2017 9/4/2017 0.65 PRODS DRILL DISP P Stab INJH onto stump, circulate coil to 0.0 0.0 14:00 14:39 drilling fluid.Unstab INJH, move cart back 9/4/2017 9/4/2017 1.75 PRODS DRILL PULD T PU/PD pre -loaded BHA# 30 0.0 78-.3- 14:39 16:24 9/4/2017 9/4/2017 0.25 PRODS DRILL PULD T Stab INJH, surface test Coiltrak tools 78.3 78.3 16:24 16:39 (good -test), tag up, zero counters 9/4/2017 9/4/2017 2.00 PRODS DRILL TRIP T RIH, w/AL2 drilling BHA# 30 78.3 12,595.0 16:39 18:39 w/agitator and RR bi-center bit 9/4/2017 9/4/2017 0.15 PROD3 DRILL DLOG T Log the K1 marker correction of plus 12,595.0 12,632.0 18:39 18:48 8.5' 9/4/2017 9/4/2017 0.25 PROD3 DRILL TRIP T Continue IH 12,632.0 13,750.0 18:48 19:03 9/4/2017 9/4/2017 1.50 PROD3 DRILL DRLG T OBD, 1.8 bpm at 4,875 psi FS, BHP 13,750.0 13,862.0 19:03 20:33 3,996, WHIP 0, IA 0, OA 364, CTSW=9 it, DHWOB=1.7 it, ROP 69 fph 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T BHA wiper, PUW 44 k 13,862.0 13,862.0 20:33 20:42 9/4/2017 9/4/2017 2.00 PRODS DRILL DRLG T BOBD, 1.75 bpm at 4,888 psi FS, 13,862.0 13,976.0 20:42 22:42 BHP 9,994, WHP 0, IA 0, OA 365, CTSW=1.5 k, DHWOB=1.4 k, ROP 50 -69 fph, pump 5x5 sweep 9/4/2017 9/4/2017 0.25 PRODS DRILL WPRT T Sweep at bit, wiper up hole, PUW 44 k 13,976.0 13,750.0 22:42 22:57 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T Wiper back IH, RIW 10 k 13,750.0 . 13,976.0 22:57 23:06 9/4/2017 9/5/2017 0.90 PRODS DRILL DRLG T BOBD, 1.75 bpm at 4,797 psi FS, 13,976.0 14,053.0 23:06 00:00 BHP 3,996, WHIP 0, IA 0. OA 371, CTSW=minus 2k, DHWOB=1.7 k, ROP=50 fph Page 31151 Report Printed: 912 712 01 7 Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Lo® Stait Tine End Time our (hr) Phase Op Code Activity Code Time P -T -x Operation Start Depth (ftKa) End Depth (111(8) 9/5/2017 9/5/2017 1.40 PROD3 DRILL DRLG T OBD 1.75 bpm Ct 5000 psi, BHP 14,053.0 14,150.0 00:00 01:24 3,996, WHP 0, IA 0. OA 402, CT Wt -3 k lbs, WOB 1 k IbsROP 70 R/hr BHA wiper at 14,072'- PU 43 K Ibs BHA wiper at 14,091'- PU 45 K Itis - sent 5x5 low/hi sweep average ROP over interval drilled 70 R/hr 9/512017 9/5/2017 0.40 PRODS DRILL WPRT T Wiper#2, 700'after sweeps exit the 14,150.0 13,450.0 01:24 01:48 bit- PU Wt 40k lbs 9/5/2017 9/5/2017 0.40 PRODS DRILL WPRT T RBIH, Tight spot @ 13,850' 13,450.0 14,150.0 01:48 02:12 Swap from mud pump #2 to #1 to repair a packing leak 9/5/2017 9/5/2017 1.80 PRODS DRILL DRLG T 1.77 bpm, off bottom CT 4795 psi, diff 14,150.0 14,270.0 02:12. 04:00 944 psi, Ct RIH Wt 10 k lbs OBD, Cl wt, 8 k lbs, WOB 1.5 k Ibs. ROP 70 R/ hr Drilled into something hard -14,1663 K WOB, ROP 30 ft/hr PU & restart @ 14,165', 42 k Ibs Broke through @ 14,170'- ROP 170 ft/ hr WOB 1.5-2 k - short lived, settled in at 100 ft/hr @ 14,199' diff fell off, PU 46 k Ibs - RBIH, send 5x5 BHA wiper 100'@ 14,249' PU 43 k lbs BOBD up to 130 ft/hr w neutral coil weight and 600 lbs WOB Average ROP 67 ft/hr Losses crept up to - 0.1 bpm 9/5/2017 9/5/2017 2.50 PRODS DRILL DRLG P OBD, Ct wt, 2.5 k lbs, WOB 1 k lbs, 14,270.0 14,432.0 04:00 06:30 ROP 70 fV hr PU and restart @ 14,333' PU Wt 43k PU and restart @ 14,35' PU Wt 47k - pump 5x5 Average ROP 65 ft/hr 9/5/2017 9/5/2017 2.20 PROD3 DRILL DRLG P OBD, Ct wt, -5 k lbs, WOB 1.0 - 0.5 k 14,432.0 14,543.0 06:30 08:42 lbs, ROP 120 - 30 ft/ hr on something hard, 14,511' pump 5x5 in anticipation of a wiper trip Avemg ROP 50 ft/hr 9/5/2017 9/5/2017 0.80 PRODS DRILL WPRT P Wiper #3 after sweeps exit the bit -PU 14,543.0 12,610.0 08:42 09:30 Wt 43k Its - 1933' Saw some motor work below the window @ 12,880' 9/5/2017 9/5/2017 0.10 PRODS DRILL DLOG P RBIH, tie into Kt for+3.5' correction 12,610.0 12,633.0 09:30 09:36 - 9/5/2017 9/5/2017 0.60 PRODS DRILL WPRT P RBIH 12,633.0 14,543.0 09:36 10:24 WOB bobble @ 13,867', S/D @ 13,914' bounced through Page 32151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Time End Time our (hr) ph... Op Code AxWfty Code Time P -T -X Operation Sled Depth (NCB) End Depth(eK8) 9/5/2017 9/5/2017 4.00 PRODS DRILL DRLG P 1.83 bpm, Ct 5140 psi, diff 980 psi 14,543.0 14,649.0 10:24 14:24 RIH Wt 4 k lbs OBD, CtWt 3.5 k lbs, WOB 1.1 k, ROP 55 ft/hr PU Wt43 k lbs, Swap from Pump #1 to #2 RBIH CT Wt -5 k lbs, WOB 1.36 k lbs, ROP 43 f thr PU to get restarted Q 14,649', 45 k lbs not much change, pump 5x5 PU as sweep exited the nozzle, PU wt 43k, 9/5/2017 9/5/2017 1.80 PRODS DRILL DRLG P 1.70 bpm, free spin diff 855 psi 14,649.0 14,722.0 14:24 16:12 OBD, CtWt 4 to -5 k lbs, WOB 1 to 0.5 k, ROP 10 - 30 ft/hr Send sweeps, poor ROP and weight transfer - - PU to restart Q 14,707' , Pu Wt 46k 50 ft/hr while pill exiling then death spiral, PU Wt 50 klbs. 9/5/2017 9/512017 0.20 PRODS DRILL WPRT P PU Wt, 47 k Ibs - 300' short wiper 14,722.0 14,503.0 16:12 16:24 1 IRBIH 915/2017 9/5/2017 0.60 PRODS DRILL WPRT P 1.70 bpm, Ct 4801 psi, free spin diff 14,503.0 14,722.0 16:24 17:00 860 psi, RIH Wt 3.3k BOBO, CtWt 5 k lbs, WOB 1 k, ROP 35 ft/hr, send 10 bbl beaded pill 9/5/2017 9/5/2017 2.50 PRODS DRILL DRLG P Continue drilling ahead from 14,722', 14,722.0 14,795.0 17:00 19:30 performing BHA wipers as required, begin climbing to planned 94' inclination to regain sand at 14745' (as per geology) 9/5/2017 9/5/2017 3.50 PROD3 DRILL DRLG P OBD at 14,795', CWT= -5K -2K, 14,795.0 14,876.0 19:30 23:00 WOB =1K,.1 bbl/min losses, pumping beaded pills as required, increase NBI to 96% multiple BHA wipers to keep going, PUW from 14,843'= 52K (averaging - 42K - 44K). Began sending 5x5 sweeps from 14,862' in prep for WT & mud swap after exiling lower Al Silt, average ROP over interval = 23 fph 9/6/2017 9/5/2017 0.50 PRODS DRILL WPRT P Wiper up -hole, PUW = 45K 14,876.0 13,450.0 23:00 23:30 9/5/2017 9/612017 0.50 PRODS DRILL WPRT P wiper in-hole, clean past 13,450.0 14,200.0 23:30 00:00 13,830' (Fault#1), three 2.5K set downs at -13,869'& -13,850', PUW = 42K, reduce rate to .2 bpm & get by, set down at 13,899', again reduce to min rate & get by, RIW at 14,190'= 9.4K 9/6/2017 9/6/2017 0.20 PRODS DRILL WPRT P Continue WT in-hole 14,200.0 14,876.0 00:00 00:12 9/6/2017 9/6/2017 2.80 PROD3 DRILL DRLG P BOBO, FS=930 psi, CWT= 1K, 14,876.0 14,933.0 00:12 03:00 WOB = 1 K, circ pressure = 5413 psi, rate in = 1.7 bpm, began pumping new mud (System #5), new mud at the bit at 14,906', PUW = 50K from 14,907', increase rate to 1.8 bpm, experience significant vibrations, reduce rate back down to 1.7 bmp Page 33151 Report Printed: 912 712 01 7 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TirtB Log Stan Depth Stmt Time End Time Mr din Phew Op code A lty Cade Tme P -TA Operation (ftKe) End DeprhQB(9) 9/6/2017 9/6/2017 3.00 PRODS DRILL DRLG P Continue drilling from 14,933', rate in 14,933.0 15,018.0 03:00 06:00 = 1.7 bpm, FS = 950 psi, CWT = 5K, WOB = 1 K, continue snubbing coil, PUW = 48K from 14,941', attempt 1.5 bpm, continue to struggle with weight transfer, bring rate back up to 1.7 bpm, begin to lube up pill pit to 2% 776 (50 bbl). 9/6/2017 9/6/2017 4.20 PRODS DRILL DRLG P OBD, pumped 20 bbls 2% lube pill. 15,018.0 15,118.0 06:00 10:12 Pre, coming of a BHA wiper, 1.83 bpm, CT 5135 psi, diff 990 psi, Ct Wt -2k, - WOB 0.8 it ROP 27 ft/hr Post, all 20 bbls lube pill out Ct Wt -6, WOB 0.5 k , had to pick up. - little effect, built and pumped a 20 bbl 2% low torque sweep from active mud. WOB up to 2.8 k lbs with neg CT wt, first time we've broke 1 k WOB all morning. lube up active system to 2% low torque. 23 it/ hr average 9/6/2017 9/6/2017 0.50 PRODS DRILL DRLG P Drilling break, ROB up to 110 ft/hr 15,118.0 15,150.0 10.12 10:42 PU's dropped to 43 k lbs, able to easily turn around Weight transfer gradually deteriorated at 140 bbls away of the 20 bbl pill ROP averaged 64 ft/hr 9/6/2017 9162017 0.40 PRODS DRILL WPRT P Wiper #2 PU Wt 51 k - 1,450' 15,150.0 13,700.0 1042 11:06 14,357' to 14,200'a little motor work 13,863' motor work, -1.4 k WOB, pulled —50 k , 10 k over clean string weight 9/6/2017 9/6/2017 0.50 PRODS DRILL WPRT P Wiper RBIH 13,700.0 15,150.0 11:06 11:36 13,860' WOB spike 13,875' SID 3.3 k, PU, RBIH min rate slid through Stack weight 13,906 to 13,968 while RIH @ min rate 9/612017 9/6/2017 5.40 PRODS DRILL DRLG P BOBD, struggled to get to bottom, had 15,150.0 15,300.0 11:36 17:00 to reduce pumped rate and ramp up to drilling rale once on bottom. CT Wt -6k lbs, WOB 0.5 k ROP 20-70 ft/hr Struggling with weight transfer, build another 2% low torque pill, pump 20 bbls No change in weight transfer. Add beads to pill, pump with little benefit. Build 2 ppb beaded pills w active mud and pump as sweeps - 10 bbls each. little benefit. 9/612017 9/6/2017 4.00 PRODS DRILL DRLG P OBD, trouble turning around below 15,300.0 15,376.0 17:00 21:00 15,110' Ct wt 0 to -8 k lbs, WOB, 0.3 to 1 k Ibs, ROP 15 -40 Mr. Pumping 10 bbl beaded pills as needed with little effect Page 34151 Report Printed: 912712017 Operations Summary (with Timelog uepths) 3M-27 is Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log startoepm Sem Time End Time Dw(hr) Phase op Cotle Ar4vity code Time P -T -x OpenAon (ftKB) End Depth (11<13) 9/6/2017 9/7/2017 3.00 PRODS DRILL DRLG P Continue drilling from 15,376', CWT = 15,376.0 15,407.0 21:00 00:00 -5K, WOB -.9K, rale in = 1.7 bpm; experiencing low ROP - 10-20 fph; samples from 15,386'showing signs - of clay, rig geo sent logs and confered with town geology,decision made to increase inclination to 96° and continue drilling ahead, looking for top of C4, gamma wrapping with bit depth of 15,436' 9/7/2017 9/7/2017 3.50 PRODS DRILL DRLG P Continue drilling ahead as per 15,407.0 15,440.0 00:00 03:30 geology, climbing to 96° inclination, CWT = -51K, WOB = 1.5K, rate = 1.7 bpm, observed short ROP breakouts up to 115 fph, gamma begins to wrap at 15,405' (gamma tool depth) 9/7/2017 9/7/2017 0.40 PRODS DRILL DRLG P Contiue drilling ahead at 15,440', CWT 15,440.0 15,443.0 03:30 03:54 -4K, WOB = 1.8K, drilling through 150+ API formation, TD called at 15,433', PUW = 47K 9/7/2017 9/7/2017 4.00 PRODS DRILL WPRT P Pump sweeps, circulate down coil, lay 15,443.0 83.0 03:54 07:54 -in beaded pill as per town request (50 bbl), perfrom swab WT. Saw a little motor work, - 1 k WOB and - 4k overpull on CT Q 13,844 9/7/2017 9/7/2017 1.70 PRODS DRILL WPRT P REIN to confirm formation pressure, 83.0 12,610.0 07:54 09:36 TD, and flags 9/7/2017 9/7/2017 0.30 PRODS DRILL DLOG P Tie in, drive by, PU 40 k lbs, RBIH, Tie 12,610.0 12,631.0 09:36 09:54 into K1 for+15' connection, Park at 12631.24 bit depth, Sensor depth 6114 TVD. Trap 3852 psi, watch it fall to 3715 psi ( baker annular pressure) calculated to 11.68 ppg and trending down. 917/2017 9/7/2017 0.50 PRODS DRILL WPRT P RBIH to confirm formation pressure, 12,631.0 13,903.0 09:54 10:24 - TD, and flags set down 9/7/2017 9/7/2017 0.30 PRODS DRILL WPRT P PU and RBIH pumping min weight, 13,903.0 13,507.0 10:24 10:42 Work pipe to 14,100', PUH, pulling heavy, work pipe, squating and pulling out of hole at 75 ft/min, pulled up to 74k came free. pull up hole above the fault. CT weight 39 k lbs above the fault. 9/7/2017 9/7/2017 0.20 PRODS DRILL WPRT P RBIH, counter failed, did not notice for 13,507.0 13,661.0 10:42 10:54 3 minutes. 9x7/2017 9/7/2017 0.70 PRODS DRILL DLOG T Turn around, PU Wt 42 k PUH. 13,661.0 12,540.0 10:54 11:36 9x7/2017 9/7/2017 0.20 PRODS DRILL SVRG T Park and replace counter 12,540.0 12,540.0 11:36 11:48 9/7/2017 9/7/2017 0.20 PRODS DRILL DLOG T RBIH, tie into K1 + 13' 12,540.0 12,629.0 11:48 12:00 9/7/2017 9/7/2017 0.30 PROD3 DRILL WPRT T Continue to RIH, drop rate prior to 12,629.0 13,661.0 12:00 12:18 1 1 crossing billets and left it at 0.4 bpm. 9/7/2017 9/7/2017 0.60 PRODS DRILL WPRT P Continue to RIH, see 2 WOB bobble 13,661.0 15,406.0 12:18 12:54 at 13,837 and 14,00'. Increase pump rate to 1.2 below trouble area 13,400. Stack coil weight @ 14,779' reduce rate to 0.7 bpm, contiune on in hole. Set down in hot gamma area, slack 2.25K WOB Page 35/51 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Timid Log Stan Tine Ertl Time our (hr) Plass Op Code Activity Cotle Time P -T -x Operatlon sten Depth (M(B) End Depth(WB) 9/7/2017 9/7/2017 3.60 PRODS DRILL WPRT P PU, 49 k lbs 15,406.0 100.0 12:54 16:30 Pump beaded liner running pill start PUH after letting - 6 bbls out the bit Paint Yellow EDP flag @ 14178.2 in tension Chase liner running pill w KW Pull through fault area, neg WOB spikes from 13,875-13,833'. Paint White window flag @ 10976.12' continue to POOH. 9/7/2017 9/7/2017 1.50 PRODS DRILL PULD P At surface flow check - good, PJSM, 100.0 0.0 16:30 18:00 LD BHA #30. 9/7/2017 9/7/2017 2.40 COMPZ3 CASING PUTB P PJSM, PU AL2 Liner Run #1, (non- 0.0 1,653.0 18:00 20:24 ported bullnose, 31' pup, 4 jnts slotted liner, 2 tracer pups, 36 jnts slotted, & shorty deployment sleeve) 9/7/2017 9/7/2017 0.60 COMPZ3 CASING PULD P PU BHA#31, AL2 Liner Running 1,653.0 1,697.0 20:24 21:00 Tools (CoilTrack), slide in cart, stab on coil, bump up, set counters 917/2017 9/8/2017 3.00 COMPZ3 CASING RUNL P RIH with AL2 Liner Run #1, PUW = 1,697.0 13,844.0 21:00 00:00 42K at window, tie into window flag for +15' correction Stack weight at 13,600'- 13,844', work pipe, PUW's = 45K -50K, up to negativel OK WOB. 9/8/2017 9/8/2017 3.00 COMPZ3 CASING RUNL P Continue RIH with AL2 Liner Run #1, 13,844.0 . 14,400.0 00:00 03:00 stack weight from 13,844' through14,115', PUws 45K -48K, working liner at various speed, significant time working past 14,124'& 14,345' (top of crest past Fault #1), 9/8/2017 9/8/2017 1.50 COMPZ3 CASING RUNL P Continue working AL2 liner Run #1 14,400.0 15,410.0 03:00 04:30 towards bottom, stacking reduced sigftcanllyfroml4,530', experience difficulty working liner past 15,073', park, circulate at .25 bpm, attempt again & get by, arrive at setting depth (bottom at 15,410'), bring up rate to 1.7 bpm, release off liner. 9/8/2017 9/8/2017 3.00 COMPZ3 CASING TRIP P POOH, paint EDP flags 15,410.0 71.0 04:30 07:30 13,314' (yellow), & 13,270' (white), tie into K1 for+5' correction 9/8/2017 9/8/2017 0.50 COMPZ3 CASING PULD P At surface, PJSM, flow check - good, 71.0 0.0 07:30 08:00 LD liner running asembly over a dead well, inspected pipe --20' good. 9/8/2017 9/8/2017 1.50 COMPZ3 CASING PUTB P Prep floor for running liner, PU and 0.0 400.0 08:00 09:30 run 10 R3 joints 2-3/8" 4.6# L-80 slotted liner topped W two pups, 16.15' and an aluminum billet W openhole anchors, ported bullnoseon bottom, upper AL2 liner length - 428.58 9/8/2017 9/8/2017 0.70 COMPZ3 CASING PULD P PU / MU BHA #32 over a dead well, 400.0 489.8 09:30 10:12 tag up, set counters, open EDC, 9/8/2017 9/8/2017 2.90 COMPZ3 CASING RUNL P RIH, 400.0 12,589.8 10:12 13:06 Tie in to window flag for+ 15.4' correction. Page 36151 ReportPrinted: 912 712 01 7 Operations Summary (with Timelog uepths) Agr'hl 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stait Depth Stat)Time End Tmre Dw thin Phew Op Cade A ivdy Cade Time ?-T-X Operation We) End Depth MKa) 9/8/2017 9/8/2017 1.00 COMPZ3 CASING RUNL P Down on pumps, Close EDC, PU Wt 12,589.8 13,759.0 13:06 14:06 42.5 k lbs continue to RIH Tie into K1 for+6.5' correction Trip to bottom at 35 ft/min with 14k Ct Wt, 0 WOB SID @ 13,759', WOB 3.38 k PU Wt 42 RBIH, S/D @ 13,759', 3.3K WOB, PU 35 k to slack weight, WOB 1.6 k, slip oriented 180 *ROHS. Online with the pumps, sheared - 4500 psi. PU Wt 40k, WOB 0 k lbs 9/8/2017 9/8/2017 2.30 COMPZ3 CASING TRIP P Park, reset counters, -POOH 13,759.0 70.0 14:06 16:24 9/8/2017 9/8/2017 1.00 COMPZ3 CASING PULD P At surface, flow check - Good, PJSM, 13,759.0 70.0 16:24 17:24 LD BHA #32. 9/8/2017 9/812017 0.80 PROD4 DRILL BOPE P Weekly BOP function test, good 0.0 0.0 17:24 18:12 9/812017 9/8/2017 1.10 PROD4 STK PULD P PJSM, PU BHA #33, AL2-1 lateral 0.0 78.0 18:12 19:18 drilling assembly (0 hr agitator, 0.5° AKO X-Treme motor, RB Hughes bit), slide in cart, stab on coil, check pack- offs, good, check BHI counter, tag up, set counters, open EDC 9/8/2017 9/8/2017 2.40 PROD4 STK TRIP P Begin RIH with BHA #33, close EDC 78.0 12,605.0 19:18 21:42 at 500', bring up rate, surface test agitator, good 9/8/2017 918/2017 0.30 PROD4 STK DLOG P Tie into K1 fo+18' correction, park, 12,605.0 12,649.0 21:42 22:00 open EDC 9/8/2017 9/8/2017 1.50 PROD4 STK DISP P Circulate hole to drilling fluid, observe 12,649.0 12,669.0 22:00 23:30 significant cuttings coming over shakers, observe small "plastic" looking material/shavings mixed with cuttings & beads, shut down pumps, close choke, close EDC 9/8/2017 9/8/2017 0.30 PROD4 STK TRIP P Continue RIH, tag TOB at 13,327', 12,669.0 13,327.0 23:30 23:48 PUW = 42K 9/8/2017 9/9/2017 0.20 PROD4 STK KOST P Bring rate up to 1.8 bpm, FS = 812 13,327.0 13,327.0 23:48 00:00 psi, begin kicking off billet at 150° ROHS, CWT = 14K, WOB =.7K, annular = 3900 psi, WHP = 0 psi, circ pressue = 4938 psi, 9/9/2017 9/912017 2.20 PROD4 STK KOST P Continue to KO billet at 13,227', FS = 13,327.0 13,337.0 00:00 02:12 860 psi, CWT = 14.3K, WOB =.55K. annular = 3907 psi, WHP = 0 psi, aluminum over shakers 9/9/2017 9/9/2017 1.80 PROD4 DRILL DRLG P Off billet w/o issue, drilling in 13,337.0 .13,500.0 02:12 04:00 formation, CWT = 1OK, WOB = 1.5K, rate in = 1.8 bpm, annular= 3893 psi, dry drift billet up & down, clean WOB spike at 13,426' of 3852 psi, PU, FS down by -50 psi, bore pressure down by - 70 psi of bottom, continue drilling ahead watching parameters, similar event occured at 13,485' Page 37151 Report Printed: 912712017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Siad Time End Time Dur(hr) Phase Op Cade Activity Cede Tima P -T -X Operation Stan Depth (Min End Depth (f") 9/9/2017 9/9/2017 0.50 PR0D4 DRILL DRLG P PUW = 50 K, BHA wiper, losses 13,500.0 13,538.0 04:00 04:30 began at 13,494', losing -.37 bpm, continue drilling, FS =850 psi, CWT = 9K, WOB = .43K, rate in= 1.76 bmp, rate out = 1.58 bpm, losses appear to be healing with continued drilling, experience difficulty obtaining survey 9/9/2017 9/9/2017 0.50 PR0D4 DRILL WPRT T Difficulty obtaining a clean survey, 13,538.0 13,538.0 04:30 05:00 PUH in attempt to get survey as per DD, no luck, RBIH to continue drilling in attempt to obtain clean survey. 9/9/2017 9/9/2017 1.00 PR0D4 DRILL DRLG P BOBD, FS = 829 psi, obtained clean 13,538.0 13,600.0 05:00 06:00 survey at 13,513', CWT = 8K, WOB 2.6K, 9/9/2017 9/9/2017 0.20 PR0D4 DRILL WPRT T PU, in attempt to re log missed- 13,600.0 13,473.0 06:00 06:12 surveys 9/912017 9/9/2017 0.60 PROD4 DRILL WPRT T RBIH , attempt to pick up missed 13,473.0 13,600.0 06:12 06:48 surveys. caught enough to continue drilling with in parameters. 9/9/2017 9/9/2017 2.30 PR0D4 DRILL DRLG P Attempted to vary pump rate to clean 13,600.0 13,771.0 06:48 09:06 up surveys, no vibrations, not pump related. Appears to be interference from the AL2 liner that we just set. Ct RIHWt 10 k lbs, 1.76 bpm in/1.68 bpm out, CT 4747 psi, free spin 770 psi. OBD, WOB 1.5 to 2.5 k lbs, ROP 30- 220 ft/hr, ROPs increased -13650 Send 5x5 sweep to time out for wiper Average over interval 74 ft/hr 9/9/2017 9/9/2017 0.30 PR0D4 DRILL WPRT T Wiper trip #1, PU 48 k lbs, PU after 13,771.0 13,350.0 09:06 09:24 5x5 exited the bit, PUH atempting to relog the misses surveys. No sucess. 9/9/2017 9/9/2017 0.40 PR0D4 DRILL WPRT T RBIH 13,350.0 13,771.6- 09:24 09:48 9/9/2017 9/9/2017 0.50 PR0D4 DRILL DRLG P Ct RIHWt 10 k Ibs,1.75 bpm in /1.67 13,771.0 13,827.0 09:48 10:18 bpm out, Ct 4840 psi, diff 807 psi, OBD, CT Wt 7 k lbs, WOB 2 k lbs, ROP 100 ft/hr 9/9/2017 9/9/2017 5.20 PR0D4 DRILL DRLG P Stack 3.46 k WOB @ 13,827'- no 13,827.0 14,020.0 10:18 15:30 motor work PU, 50 k attempt to restart, high weight on bit, low diff. - PU and try again, 47 k PU Wt, same results PU 49 k, 100' BHA wiper, RBIH Got a b8e, making hole, lost Ct Wt Ct Wt 2.5 It, WOB 2 k lbs, ROP initially 100 ft/hr then tapered off rapidly to 50 then 30 ft/hr, Inc fell from 93 to 89° while drilling ahead. Got the call @ 12:50 -13,934' to turn straight up. Having a hard time building angle. Weight transfer diminishing. Page 38151 Report Printed: 9127/2017 ,. Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start cepm Starl Tine End Tena Our M) Phase Op Cade Activity Code Time P -T -X Operatmi (Itl(B) End Depth (MG) 9/9/2017 9/9/2017 0.30 PROD4 DRILL DRLG P PU and reduce rate to try and build 14,020.0 14,030.0 15:30 15:48 more angle. 1.53 bpm in/1.44 bpm out, CT 4288 psi, Diff 682 psi, Trying to target 2.5 k to 3 k WOB Ct wt -5 k Itis, WOB 1.99 k 9/9/2017 9/9/2017 1.00 PROD4 DRILL WPRT P Pump 5 x5 sweep PU Wt 42 k lbs. 14,030.0 12,752.0 15:48 16:48 PUH while sweeps travel to bit, pull to 13,855' Saw neg WOB spike Q 13,865' RBIH timing sweeps to exit near bottom, RIH Wt 10 k lbs PUH chasing sweeps on wiper trip through the build, saw motor work 12,880' 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT P RBIH 12,752.0 14,030.0 16:48 17:06 9/9/2017 9/9/2017 1.40 PROD4 DRILL DRLG P Try reduced rate and increased WOB 14,030.0 14,065.0 17:06 18:30 to build angle, confered with town, dedson made to POOH and PU higher bend motor and new bit, pump sweeps 9/9/2017 9/9/2017 3.50 PROD4 DRILL TRIP T POOH, PUW = 45K, observe a bit of 14,065.0 78.0 18:30 22:00 motor work at -12,892' in build, park at 12,574', shut down pumps, close choke, open EDC, continue POOH, dose EDC, surface test agitator, good, tag up, space out (PJSM) 9/9/2017 9/9/2017 1.80 PROD4 DRILL PULD T PUD BHA#33, checks not holding, 78.0 0.0 22:00 23:48 gather crew, quickly talk through PUD check list contingency for checks not holding, complete PUD, Hughes bit came out a 3-1 9/9/2017 9/10/2017 0.20 PROD4 DRILL PULD T Reconfigure BHA, PJSM, begin PD 0.0 0.0 23:48 00:00 BHA #34 (same agitator, 0.6+° AKO motor, RB HYC B8 Edge bit) 9/10/2017 9/10/2017 1.30 PROD4 DRILL PULD T Complete PD BHA #34 (agitator, 0.6'+ 0.0 78.0 00:00 01:18 AKO motor, RB HYC B8 Edge bit), slide in cart, stab coil, check pack -offs, open EDC, tag up, set depth counters 9/10/2017 9/10/2017 2.40 PROD4 DRILL TRIP T Begin RIH with BHA #34, close EDC, 78.0 12,587.0 01:18 03:42 lest agitator at 500', good, continue RIH Note: Crew performed "Spill Drill", excellent response time & communication 9/10/2017 9/10/2017 0.20 PROD4 DRILL DLOG T Log K1 for +11' correction 12,587.0 12,638.0 03:42 03:54 9/1012017 9/1012017 0.50 PROD4 DRILL TRIP T Continue RIH 12,638.0 14,050.0 03:54 04:24 9/10/2017 9/1012017 2.60 PROD4 DRILL DRLG P Tag bottom at 14,050'( higher than 14,065.0 14,210.0 04:24 07:00 expected (expected 14,065'), attempting to build, pumping 1.4 bpm, FS=665 psi, CWT =4K, WOB= 3.5K, annular = 3916 psi, unable to drill ahead, PU, bring up rate to 1.8 bpm, RBIH to 14,065 (expected bottom depth), FS = 1000 psi, CWT = 8.5K, WOB = 2K Page 39161 Report Printed: 912 712 01 7 Operations Summary (with Timelog L)epths) 3M-27 C�riocoPlhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Lop Start Depth Start Tim ErxInMe our (hr) Phase Op Code Activiy Code Time P.T-X Operation M) End Depth (W13) 9/10/2017 9/10/2017 1.60 PROD4 DRILL DLOG T PU Wt40 k lbs PU to catch missed 14,210.0 14,127.0 07:00 08:36 survey. No success. Slow tripping rale, slow pump rate, park. No success. Pull up hole to re shoot old surveys, no success. Troubleshoot tools, research magnetic storm info, all indications are a tool failure. 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Decision made to trip for tool 14,127.0 6,036.0 08:36 10:18 PUH into casing, Open EDC, Pump 2.20 bpm and POOH 9/10/2017 9/1012017 1.70 PROD4 DRILL TRIP T Pipe pin holed as it came across the 6,036.0 88.0 10:18 12:00 goose neck. - 6030' pin hole -15' off end of goose neck. " Parked, down on pumps, bled pressure, upper checks holding. Eased coil onto the storage reel and marked hole with paint. Continued out of hole. 9/10/2017 9/10/2017 1.50 PROD4 DRILL PULD T Bump up, PUD +LID BHA#34 88.0 0.0 12:00 13:30 9110/2017 9/10/2017 0.50 PROD4 DRILL CTOP T Clean floor, install nozzle and stab on. 0.0 0.0 13:30 14:00 9/10/2017 9/10/2017 3.00 PROD4 - DRILL DISP T Line up coil to displace Power Pro w 0.0 0.0 14:00 17:00 water, -0.5 bpm, 1100 psi, returns to the pit. HES N2 PJSM and dg up. 9/10/2017 9/10/2017 1.50 PROD4 DRILL DISP T Water back to the pits, divert returns 0.0 0.0 17:00 18:30 to the TT, Halliburton cooling down PT to 3,500 psi., blow down surface lines & reel with N2, bleed down WHP &. coil pressure, HES dg down 9/10/2017 9/10/2017 2.70 PROD4 DRILL CTOP T Pumping managed pressure (1000 0.0 0.0 18:30 21:12 psi), align inner reel iron, slide back _ cart, lock out & chain reel, lock out injector, remove bulkhead & inner reel iron, cut a -line, remove depth counters Peak moved reel #5772 to 1 ES by 20:00 hrs to begin MU plates & spacers. Notification given to AOGCC for early BOPE test (10:00am 9/11), witness waived by Jeff Jones. 9/10/2017 9/11/2017 2.80 PROD4 DRILL CTOP T PJSM, install grapple, pull test, 0.0 0.0 21:12 00:00 unstab, wind up, & secure coil in prep for reel swap, cut coil 9/11/2017 9/11/2017 3.00 PROD4 DRILL CTOP T PJSM, stack cable, unlock reel, rig up 0.0 0.0 00:00 03:00 shackles/slings, remove saddle clamps, 9/1112017 9/11/2017 2.30 PROD4 DRILL CTOP T PJSM, Lift reel from saddles, drop 0.0 0.0 03:00 05:18 hubs & spacers, SIMIPS remove stripper, inspect brass Note: Losing -1 bbVhr pumping MP 9/11/2017 9/1112017 6.70 PROD4 DRILL CTOP T Remove & replace A -frame, Cut 0.0 0.0 05:18 12:00 remaining coil in pipe shed, clean stripper and replace brass. Page 40/51 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sort Depth Start Time End Tma Dur(hr) Phase Op Code Aclivity Code Time P -T -X Operation (IIKB) End Depth(11(B) 9/11/2017 9/11/2017 6.00 PROD4 DRILL CTOP T Flush lines, remove and replace R1 0.0 0.0 12:00 16:00 and R3, Re install stripper brass, PJSM, Load storage reel onto Peak bed truck. Crew change 9111/2017 9/11/2017 4.00 PROD4 DRILL CTOP T pick up stripper and QTS, skid cart, 0.0 0.0 18:00 22:00 install night cap, grease stack and valves, central shops valve crew greased tree valves, flood up. 9/11/2017 9/12/2017 2.00 PROD4 WHDBOP BOPE P BOP Start time 10:00 - Wintess 0.0 0.0 22:00 00:00 waived by Jeff Jones AOGCC Test #1, swab - good Test #2, Lower blind, TV2 - good Test #3, TVI, - good Test #4, Upper blind, B1&5, C 4,5,8,&12, R1, Bleederl -good Test #5, C 3,6,7,&11 B2&6 and T2 - ran out 5 min -good Test #6, Manual ChokeD and Super Choke C, -good Test #7, C2, 10 and T 1 - good Test #8, R1, Bleeder 2, Charlie 1 &9 - good 9/12/2017 9/1212017 3.00 PROD4 WHDBOP BOPE P Continue BOPE test 0.0 0.0 00:00 03:00 Test #9, Bravo 4 &8, Romeio 3, &. Bleeder 3 - good Test #10, Bravo 3 & 7 - good Test #11, annular BOP, - good Test #12, Upper 2-3/8" pipe slip rams, Upper TIW valve - good ' Test #13, Lower 2-3/8" pipe slip rams - good Test #14, Lower 2" pipe slip rams - fail/pass Test #15, Upper 2" pipe slip rams, lower TlW valve -gootl Accumulator draw down test, good No inner reel iron test, waiting on reel Test complete in 5 hrs. 9/1212017 9/12/2017 3.00 PROD4 DRILL CTOP T Blow down chokes, clean down lower 0.0 0.0 03:00 06:00 mast, inspect chokes, grease R1, 2, & - 3, lay down lest joint, install spacer on hub, prepping CTS counter for reel install 9/12/2017 9112/2017 4.00 PROD4 DRILL CTOP T Continue prepping to ensure rig is 0.0 0.0 06:00 10:00 ready for reel install, change out rubber on inner reel iron, various dg cleaning projects... 9/12/2017 9/12/2017 8.00 PROD4 DRILL CTOP T Installed rebuild INJH counter 0.0 0.0 10:00 18:00 assembly, prep/dress grapple connector for new coil, install spacer plate on reel motor hub, clean INJH blocks, stock pits with sack products, two hands went to Deadhorse to help with reel mods, Build Bulk Head, test - gas alarms, inspect lighting around rig, inspect elevators, work on work orders, and mop around dg. Make trip to Deadhorse to inspect work on spool. Page 41151 Report Printed: 912712017 Operations Summary (with Timelog Depths) a 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stert Depth. Start Time EM Time DW(hr) Phase Op code Activity Code Time P -T -X Operation - (Nl3) End Depth (WO) 9/12/2017 9/12/2017 1.50 PROD4 DRILL SFTY T Hold Nabors global safety week kick 0.0 0.0 18:00 19:30 off meeting I CTD performance YTD with Patrick Doherty and Kazeem Adegbola 9/1212017 9/13/2017 4.50 PROD4 DRILL CTOP T Prep reel area for new spool, Service 0.0 0.0 19:30 00:00 level wind, Clean gripper blocks, Change oil in right angle drives. Work orders 9/13/2017 9/1312017 6.00 PROD4 DRILL CTOP T Continue prepping for next reel install 0.0 0.0 00:00 06:00 9/13/2017 9/13/2017 10.00 PROD4 DRILL CTOP T Torqued up all pillow block bolts, put 0.0 0.0 06:00 16:00 together all tools and parts for intalling . hubs, inspected SRL's and replaced lie back lines, inspected all re -heading equipment, hooked back up drawwork camera, sent 2 rig hands to Deadhorse to assist on spool mods, shipped all tubing cdbbage back to warehouse. 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T Replace INJH motor #2 with new style 0.0 0.0 16:00 18:00 coupler 9113/2017 9/13/2017 - 1.50 PROD4 DRILL CTOP T Crew change, continue replacing 0.0 0.0 18:00 19:30 coupler on motor # 2 9/13/2017 9/1312017 2.00 PROD4 DRILL CTOP T New CT string on location. Swap out 0.0 0.0 19:30 21:30 nuts on hub adapters and double check torque. 9/13/2017 9114/2017 2.50 PROD4 DRILL CTOP T Coupler upgrade complete. Spot in 0.0 0.0 21:30 00:00 reel on flatbed and dg up to pick. Pick up string and install. Torque up saddle clamps, Rig up stabbing grapple to CT and pull test 9/14/2017 9/1412017 2.50 PROD4 DRILL CTOP T Pull CT into injector, Rig down 0.0 0.0 00:00 02:30 stabbing cable. Trim 7' of coil to find wire. Test wire, 550 MOhmes, 50.1 Ohmes Good test 9/1412017 9/14/2017 3.50 PROD4 DRILL CTOP T PJSM to install inner reel iron and CT 0.0 0.0 02:30 06:00 connector- Prep CT for CT connector and install. 9/14/2017 9/14/2017 8.50 PROD4 DRILL CTOP T Crew change, install bulkhead (5116 th 0.0 0.0 06:00 14:30 cable) and junction box, line up wash pipe inside reel, with new clamp, check inner reel iron and secure, head -up BHI upper quick, change pac-offs, stab INJH, fluid pack reel 9/14/2017 9/14/2017 0.80 PROD4 WHDBOP BOPE T Test and chart inner reel and stripper 0.0 0.0 14:30 15:18 test 9/14/2017 9/14/2017 1.00 PROD4 DRILL CTOP T Displace reel to drilling fluid, PT CTC 0.0 0.0 15:18 16:18 4,000 psi 9/14/2017 9/14/2017 1.50 PROD4 DRILL PULD T PJSM, MU/PD drilling BHA# 35m M1U 0.0 78.2 16:18 17:48 to coil and surface test, Start BHI NPT @16:55 9/14/2017 9/14/2017 3.30 PROD4 DRILL TRIP T Trip in well, No CTK depth, plug in 78.2 12,171.0 17:48 21:06 encoder, @ 11895' CTES EDP counters are off- 100'. Injector counters off depth, Clean counters on way in hole. New CT string appears to have an anti corrosion coating allowing counters to slip Page 42151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sbrt Depth Start Tme End Time Dix (hr) Phase op coEe Activity cotle Time P -T -X ope2emt WE) End Depth (RK8) 9/14/2017 9/1412017 0.70 PROD4 DRILL DLOG T Log RA for+424'Again clean 12,171.0 12,330.0 21:06 21:48 - counters, CT still has some coating on it 9/14/2017 9/14/2017 1.50 PROD4 DRILL TRIP T Continue in hole, Perform check 12,330.0 14,179.0 21:48 23:18 surveys, slow down to get gamma info to compare with earlier logs 13874 to 13890'- Depths off 9/14/2017 9/15/2017 0.70 PROD4 DRILL WPRT P 14179 appears to be bottom, Come up 14,179.0 13,752.0 23:18 00:00 to 1.5 BPM, wiper up hole circulating drilling fluid, cleaning up CT string, PUW=40K, Start dragging heavy Q 14009, RBIH, PUH pulling 50-55K 1400910 13752 END BHI NPT @ - 23:19 for 6.4 His — TT NPT BHI MWD DGS 11.0 him 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT P Continue up hole to tie into gamma 13,752.0 13,630.0 00:00 00:12 signature @ 13850' 9/15/2017 9/15/2017 0.30 PROD4 DRILL WPRT P RBIH, Setdown @ 13842, Attemp to 13,630.0 13,840.0 00:12 00:30 tie in sticky hole conditions preventing maintaining logging speed 9/15/2017 9/15/2017 0.40 PROD4 DRILL, WPRT P Wiper up hole to log RA. PUW=40K 13,840.0 12,650.0 00:30 00:54 9/15/2017 9/1512017 0.40 PROD4 DRILL DLOG P Log RA for +30.6 correction 12,650.0 12,727.0 00:54 01:18 9/15/2017 9/15/2017 1.30 PROD4 DRILL WPRT P Wipe back in hole, redo check shot 12,727.0 14,210.0 01:18 02:36 surveys 9/15/2017 9/15/2017 4.00 PROD4 DRILL DRLG P 14,210', Tag bottom where it is 14,210.0 14,341.0 02:36 06:36 supposed to be. 13,850 to 14,000' area has cleared up. Drill ahead 1.8 BPM @ 5286 PSI FS, BHP=4260, RIW=-2K, DHWOB=IK, WHP=O, ECD=12.8, ROP 40 to 65 FPH New Mud at the bit 14,336' Old Mud stats; 1,546' DF, 0.75% DS 9/1512017 9/15/2017 0.50 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,341.0 14,341.0 06:36 07:06 perfrom check shots, unable to get clean survey's, confer with town, phone in survey IFR to Sperry Drilling/Haliburton survey management analyst 9/15/2017 9/15/2017 1.50 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,750 psi, BHP 14,341.0 14,354.0 07:06 08:36 3,970, WHP 20, IA 0, OA 417, CTSW=2 k, DHWOB=1.5 k, ROP 10 fph 9/1512017 9/15/2017 0.25 PROD4 DRILL WPRT T PUH, perform check shots, getting 14,354.0 14,354.0 08:36 08:51 1 clean survey's, RBIH 9/15/2017 9/1512017 3.25 PROD4 DRILL DRLG P BOBO, 1.8 bpm at 4,715 psi, BHP 14,354.0 14,490.0 08:51 12:06 3,973, WHP 20, IA 0, OA 417, CTSW=O k, DHWOB=1.0 k, ROP 51 fph 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,490.0 14,490.0 12:06 12:18 perfmm check shots, able to get clean survey's "' Note: Kick While drilling drill Page 43151 Report Printed: 9127/2017 Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Timis Log steel oeptn StartTme E Tine Dx mri Phase op cone I A.Wity Cade Time P -T -x operation (fiKa) End oepin (N(a) 9/15/2017 - 9/15/2017 2.85 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,715 psi, BHP 14,490.0 14,595.0 12:18 15:09 4,010, WHP 24, IA 0, OA 454, CTSW=1.7 k, DHWOB=1.5 k, ROP 60 fph 9115/2017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 13,850'. PUW 34 k 14,595.0 13,850.0 15:09 15:39 9/15/2017 9/15/2017 0.20 PROD4 DRILL DLOG P Log up to check depth from 13,915'- 13,850.0 13,915.0 15:39 15:51 13,872', depth ok 9/152017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 2 k. 13,915.0 14,595.0 15:51 16:21 9115/2017 9/15/2017 0.25 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,610 psi, BHP 14,595.0 14,595.0 16:21 16:36 4,145, WHP 24, IA 0, OA 456, CTSW=minus 2 k, DHWOB=minus 5.9 k, ROP 30 fph 91152017 j 9/15/2017 0.50 PROD4 DRILL WPRT T Counter locked up, wiper up hole to 14,595.0 12,720.0 16:36 17:06 log R4 marker for depth control, PUW=35K 9/15/2017 9115/2017 0.20 PROD4 DRILL DLOG T Log Tie in for +9.5'correction 12,720.0 12,571.0 17:06 17:18 9/15/2017 9/15/2017 0.80 PROD4 DRILL WPRT 'T Wiper back in hole to drill 12,571.0 14,603.0 17:18 18:06 9/15/2017 9/15/2017 1.90 PROD4 DRILL DRLG P 146031, Drill, 1.77 BPM @ 4835 PSI 14,603.0 14,640.0 18:06 20:00 FS, BHP=4090. RIW=1.7K, DHWOB=.8K 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT P Pull BHA wiper, PUW=37K 14,640.0 14,640.0 20:00 20:12 9/152017 9/16/2017 3.80 PROD4 DRILL DRLG P 14640', Drill, 1.79 BPM @ 4735 PSI 14,640.0 14,759.0 20:12 00:00 FS, BHP=4735 9/16/2017 9116/2017 4.40 PROD4 DRILL DRLG P 14,759', Drill ahead, 1.78 BPM @ 14,759.0 14,858.0 00:00 04:24 1 4735 PSI FS, BHP=3950, RIW=-4.8K, DHWOB=I.2K 911612017 9/16/2017 0.20 PROD4 DRILL WPRT P Pull BHA Wiper, PUW=34K, Stacking, 14,858.0 14,858.0 04:24 04:36 low surface weight, Low ROP, lough getting back to bottom, pull 100' trip 9/16/2017 9/16/2017 1.50 PROD4 DRILL DRLG P 14858, Drill, 1.79 BPM @ 4752 PSI 14,858.0 14,907.0 04:36 06:06 j FS, BHP=3955, RIW=2.55K off bottom . 9/16/2017 9/16/2017 2.00 PROD4 DRILL DRLG P Lower pump rate to gain ROP, PUW 14,907.0 14,959.0 06:06 08:06 35 k, 1.5 bpm at 4,070 psi FS, IA 0, OA 523BHP 3,940, WHP 0, CTSW minus 2.0 k, DHWOB=0.3 k, ROP 29 fph 9/16/2017 9/16/2017 2.50 PROD4 DRILL DRLG P PUH, by-pass screens, pump 20 14,959.0 15,000.0 08:06 10:36 beads x 20 active x 20 beads, BOBD, 1.81 bpm at 5,170 psi, BHP 4,045, WHP 0, IA 0, OA 524, CTSW=minus 2.0 k, DHWOB 0.4 k, IA 0, OA 523 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 14,000', PUW 34 k 15,000.0 14,000.0 10:36 11:06 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 1.0 k, 14,000.0 15,000.0 11:06 11:36 9/16/2017 9116/2017 0.20 PROD4 DRILL DRLG P BOBD, 1.79 bpm at 5,025 psi FS, 15,000.0 15,007.0 11:36 11:48 BHP 4,055, WHP 0, CTSW=minus 2.0 k, DHWOB=0.6 k, IA 0, OA 522 9/16/2017 9/16/2017 1.00 PROD4 DRILL WPRT P Packing off, annular pressure 15,007.0 12,720.0 11:48 12:48 increased 200 psi, wiper up hole fora tie in, pump 5x5 sweep, clean EOB Page 44161 ReportPrinted: 9127/2017 Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Dept" Stars Time End Time our (n) Phase op ca A ivrty CWe Time P -T -X Operation (") End meptiM(KKB) 9/16/2017 9/1612017 0.20 PROD4 DRILL DLOG P Log RA correction of plus 10.5' 12,720.0 12,754.0 12:48 13:00 9/16/2017 9/16/2017 0.70 PROD4 DRILL WPRT P Wiper back in hole, RIW minus 2.0 k 12,754.0 15,015.0 13:00 13:42 9/16/2017 911612017 1.60 PROD4 DRILL DRLG P BOBD, 1.82 bpm at 5,250 psi, BHP 15,015.0 15,037.0 13:42 15:18 4,105, WHP 0, IA 0, OA 522, CTSW=1.0 k, DHWOB=0.6 k, ROP 21 fph 9/16/2017 9/16/2017 0.20 PROD4 DRILL WPRT P P/U for weight transfer I slight packing 15,037.0 15,037.0 15:18 15:30 off, PUW=45K 9/16/2017 9116/2017 2.80 PROD4 DRILL DRLG P 15037', Drill, 1.42 BPM @ 404OPSI 15,037.0 15,119.o 15:30 18:16 FS, BHP=4065, RIW=-7K Q 1.41K DHWOB 9116/2017 9116/2017 1.30 PROD4 DRILL WPRT P Pull 100' wiper, PUW=39K, Cannot 15,119.0 15,119.0 18:18 19:36 gel back to bottom. Pull 1000' wiper 9/16/2017 9/16/2017 2.40 PROD4 DRILL DRLG P 15117', Drill, 1.77 BPM @ 5022 PSI 15,119.0 15,153.0 19:36 22:00 FS, BHP=4051, RIW=-2K Q 1.21K DHWOB, Pump 10 BBI beaded pill Q 19:45 9/16/2017 9/16/2017 0.30 PROD4 DRILL WPRT P Pull 100'wiper, PUW=35K 15,153.0 15,153.0 22:00 22:18 9/16/2017 9/17/2017 1.70 PROD4 DRILL DRLG P 15153', Drill, 1.69 BPM @ 4700 PSI 15,153.0 15,186.0 22:18 00:00 FS, BHP=4032, RIW=-2K Q 1K DHWOB 9/17/2017 9/1712017 0.30 PROD4 DRILL DRLG P Continue drilling ahead, 1.69 BPM @ 15,186.0 15,188.0 00:00 00:18 4700 PSI FS, BHP=4037 9/17/2017 9/17/2017 0.20 PROD4 DRILL WPRT P Lowweight, Pull 100'BHAwiper, 15,188.0 15,188.0 00:18 00:30 PUW=34K 9/17/2017 9117/2017 0.90 PROD4 DRILL DRLG P 15188 Drill, 1.67 BPM Q 4772 PSI 15,188.0 15,200.0 00:30 01:24 FS, BHP=4066, RIW 4.51K @ 1.4K DHWOB 9/17/2017 9/17/2017 0.30 PROD4 DRILL WPRT P Low weight, Pull 100'BHA wiper, 15,200.0 15,200.0 01:24 01:42 PUW=35K 9117/2017 9/17/2017 1.50 PROD4 DRILL DRLG P 15200', Drill. 1.67 BPM @ 4787 PSI 15,200.0 15,211.0 01:42 03:12 FS, BHP=4066 Pumped 10 BBI beaded pill @ 2:31 9117/2017 9/17/2017 1.00 PROD4 DRILL WPRT P 1 00'Wiper, PUW=34K, Got back to 15,211.0 15,211.0 03:12 04:12 bottom and could not get drilling, Pull 400' wiper, PUW=32K, Pumped 10 BBI Beaded pill 3:05 and 4:00 9/17/2017 9/17/2017 2.20 PROD4 DRILL DRLG P 15211', Drill, 1.69 BPM @ 7987 PSI 15,211.0 15,224.0 04:12 06:24 FS, BHP=4097 9/17/2017 9/1712017 0.30 PROD4 DRILL WPRT P 200', wiper up hole, PUW 31k, pump 15,224.0 15,224.0 06:24 06:42 5x5 low/high 9/17/2017 9/17/2017 8.00 PROD4 DRILL DRLG P 15,224', BOBD 1.40 bpm at 3950 psi 15,224.0 15,305.0 06:42 14:42 FS, BHP 4000, WHP 0, IA 0, OA 535, CTSW=minus 7.0 k, DHWOB=2 k, ROP=1.7 k, low ROP, weight transfer issues. 9/17/2017 9/17/2017 0.50 PROD4 DRILL WPRT P Pump 10x10 sweep, clean hole 15,305.0 15,305.0 14:42 15:12 9/17/2017 9/1712017 4.50 PROD4 DRILL TRIP P POOH, laying in 45 bbis beaded pill, 15,305.0 71.6 15:12 19:42 perform 300' jog from 550 feet. No additional cuttings over the shaker 9/17/2017 9/17/2017 1.70 PROD4 DRILL PULD P At surface, PJSM, PUD BHA #35 71.6 0.0 19:42 2124 Page 45151 ReportPrinted: 9127/2017 a Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tiffs Log Syed Depth stair Tune End Tme Our Qir) Phase op Code Activity Code Time P -T -X operation (M) End Depth(flKB) 9/17/2017 9/17/2017 2.40 PROD4 DRILL PULD P PJSM, M/U lower section of tool, FVS, 0.0 78.2 21:24 23:48 agitator, 2 318".5' motor, RR HYC bit. PD BHA #36. Check pack offs, Change out checks in UDC. WU to coil and surface test. Strip on well 9/17/2017 9/18/2017 0.20 PROD4 DRILL TRIP P Trip in well, shallow test agitator, 78.2 400.0 23:48 00:00 1 1 continue in well 9/18/2017 9/1812017 2.20 PROD4 DRILL TRIP P Continue in well after shallow agitator 400.0 12,595.0 00:00 02:12 test 9/18/2017 9/18/2017 0.20 PROD4 DRILL DLOG P Log K1 for +7.5, PUW=29K 12,595.0 12,622.0 02:12 02:24 9/18/2017 9/18/2017 2.00 PROD4 DRILL TRIP P Continue in well, clean pass through 12,622.0 15,315.0 0224 04:24 window, clear through 13850 to 14,000'. Last 30'tight hole conditions with low surface weight, DHWOB with no differential pressure. Annular pressure fluctuating. Multiple pick ups to work to bottom 9/18/2017 9/18/2017 5.50 PROD4 DRILL DRLG P 15315', Drill, 1.62 BPM @ 4863 PSI 15,315.0 15,382.0 04:24 09:54 FS, BHP=4228, DHWOB=I.4K RIW=- 4.6K BHA Wipers 15328',15340', 15357',15372,15382', PUW 35-38 k 9/1812017 9/18/2017 0.50 PROD4 DRILL CIRC P Pump 10x10 sweep, followed by 15,382.0 15,366.0 09:54 10:24 beaded drilling fluid pill 9/18/2017 9/18/2017 2.85 PROD4 DRILL WPRT P POOH, laying in drilling fliud beaded 15,366.0 1,533.0 10:24 13:15 pill, little motor work as well as over pulls lhru 13850' area, continue POOH Perform 300' jog at 1,500' 9/18/2017 9118/2017 0.15 PROD4 DRILL SVRG P Adjust goose neck 1,533.0 1,533.0 13:15 13:24 9/1812017 9118/2017 0.40 PROD4 DRILL WPRT P Continue wiper to surface, testing 1,533.0 78.2 13:24 13:48 agitator (good test) 9/1812017 9/18/2017 0.15 PROD4 DRILL TRIP P At surface, re -set counters 78.2 78.2 13:48 13:57 9/1812017 9/18/2017 2.00 PROD4 DRILL TRIP P RBIH, to confirm TD 78.2 12,600.0 13:57 15:57 9/18/2017 9118/2017 0.25 PROD4 DRILL DLOG P Log the K1 marker correction of plus 12,600.0 12,644.0 15:57 16:12 4.5' 9/18/2017 9/18/2017 0.25 PROD4 DRILL TRIP P PUW 28 k, continue IH, perform static 12,644.0 12,710.0 16:12 16:27 pressure check at 12710' bit depth, sensor depth 6,172 TVD, 3,723 psi AP, 11.7 ppg, and dropping. Continue IH lhru window 9/1812017 9/18/2017 1.25 PROD4 DRILL TRIP P Continue IH, RIH 8 k 12,710.0 15,380.0 16:27 17:42 9/1812017 9/18/2017 0.50 PROD4 DRILL CIRC P Confirmed TD 15,380', circulate 12.0 15,380.0 15,380.0 17:42 18:12 ppg beaded liner pill into coil. 9/18/2017 9/18/2017 3.50 PROD4 DRILL TRIP P POOH, laying in 12.0 ppg liner running 15,380.0 78.2 18:12 21:42 pill with beads up to 12070', painting EDP flags at 10,900' (white) & 13,600' (yellow) 9/18/2017 9/18/2017 0.50 PROD4 DRILL OWFF P At surface, check well for flow, PJSM 78.2 78.2 21:42 22:12 for LD drilling BHA on a dead well 9/182017 9/18/2017 DRILL PULD P LD Drilling BHA# 36 78.2 0.0 22:12 23:12 =4 Page 46151 Report Printed: 912712017 Operations Summary (with Timelog Oepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Sum'rme End Time Dur(hr) Phase Op Code Activity Cmie Time P -T -X Operation (Pom End Depth(11Ka) 9/18/2017 9/18/2017 0.50 PROD4 DRILL PULD P Function test BOP stack 0.0 0.0 23:12 23:42 9/18/2017 9/19/2017 0.30 COMPZ4 CASING PULD P Prep dg floor for PU liner assembly 0.0 0.0 23:42 00:00 ' 9/19/2017 9/19/2017 - 0.30 COMPZ4 CASING CTOP P Continue preeping floor to run liner, 0.0 0.0 00:00 00:18 PJSm to run liner 9/1912017 9/1912017 2.10 COMPZ4 CASING PUTB P M1U lower AL2 -01 liner segment with 0.0 1,673.8 00:18 02:24 non ported bullnose, 2 pups, 2 tracers # T912 Blue and T740 Freen. 39 As slotted liner and shorty deployment sleeve. 9119/2017. 9/19/2017 1.70 COMPZ4 CASING PULD P PJSM, P/U coil tmk with GS Spear, 1,673.8 1,718.0 02:24 04:06 M/U to liner. Set in slips, Skid injector. Swap out checks in UQC. Check pack offs, Make up to coil and surface test 9/19/2017 9/19/2017 1.40 COMPZ4 CASING TRIP P RIH BHA #37, AL2 -01 lower liner -. 1,718.0 12,619.0 04:06 05:30 segment 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Correct to 10,600' EDP flag for+4' 12,614.0 12,618.0 05:30 05:36 correction, PUW=32K, DHWOB=8K 9/19/2017 9/19/2017 5.70 COMPZ4 CASING TRIP P Continue in well, Clean trip through 12,618.0 15,380.0 05:36 11:18 window and past billets. Initial seldom @ 13475. Work pipe to get -5-15 feet per cycle. Clean pick ups @ 34-40K. Got clear @ 14,700' to TD @ 15380 9/19/2017 9/19/2017 0.30 COMPZ4 CASING TRIP P Liner on bottom, PUW=55K, Bring 15,380.0 13,706.2 11:18 11:36 pumps online @ 1.5BPM, PUW=30K. Liner released. PUH and remove liner length left in hole from counters, 1673.82' 9/19/2017 9/19/2017 0.40 COMPZ4 CASING TRIP P Trip out of hole, Paint 12,700' EOP 13,706.2 12,580.0 11:36 12:00 flag - Uncorrected 9/19/2017 9/1912017 0.10 COMPZ4 CASING DLOG P Log K1 for+4' correction 12,580.0 12,614.0 12:00 12:06 9/19/2017 9/19/2017 2.10 COMPZ4 CASING TRIP P Continue trip out of well, Paint EOP 12,614.0 68.5 12:06 14:12 flag @ 11,700' 9/19/2017 9119/2017 0.60 COMPZ4 CASING PULD P At surface, Flow check, PJSM. Lay 68.5 0.0 1412 14:48 down liner running tools 9/19/2017 9119/2017 0.50 COMPZ4 CASING PULD P R/U floor to run liner, PJSM Run AL2- 0.0 0.0 14:48 15:18 1 01 upper liner segment 9119/2017 9/19/2017 2.10 COMPZ4 CASING PUTB P M/U 1-2-01 upper liner segmet with 0.0 849.5 15:18 17:24 ported bull nose, 21 Jts slotted liner, and shorty deployment sleeve, Perform BOP kick while running liner drill, slide in cart, check packoffs, 9/19/2017 9/19/2017 2.70 COMPZ4 CASING RUNL P RIH with 12-01 Run #2, tie into 849.5 0.0 17:24 20:06 window flag for a +8.5' correction, lie into Ki for 0' correction, continue RIH to set depth (tagged at 13,707'), PUW = 38K, RBIH, bring up pumps to 1.4 bpm, PUW = 30K, sheared off liner 9/19/2017 9/19/2017 2.50 COMPZ4 CASING TRIP P Trip to surface, flow check well, PJSM 13,707.0 45.0 20:06 22:36 9/1912017 9/1912017 0.90 COMPZ4 CASING PULD P LD BHA #38, observe flat spot - T up 45.0 0.0 22:36 23:30 from EDP, within spec (.124" measured for .175" pipe) 9/19/2017 9/20/2017 0.50 COMPZ4 CASING PULD P PU BHA #39 (ported bull -nose, 3 pup 0.0 50.0 23:30 00:00 jnts, OH anchor & aluminum billet) Page 47151 Report Printed: 9/27/2077 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Titov Log Start Depth Stan Time End Tim. our (hr) Phase Op Code Activity Code Time P-T.X Opaallan M) End Dept (tll(s) 9/20/2017 9/20/2017 0.50 COMPZ4 CASING PULD P Continue PU BHA #39 (ported bull- 50.0 100.0 00:00 00:30 nose, 3 pup jnts, OH anchor & aluminum billet), slide in cart, stab on, . open EDC, tag up, set counters 9/20/2017 9/20/2017 3.60 COMPZ4 CASING RUNL P RIH with BHA #39, tie in for+3' 100.0 12,857.0 00:30 04:06 correction, weight check = 32K, close EDC, continue RIH to set depth, PUW = 33K, RBIH to set depth (12,856.6'), orient anchor 10° ROHS, bring up pumps, release off anchor, set down weight 4.5K WOB, good set 9/20/2017 9/20/2017 2.10 COMPZ4 CASING TRIP P POOH 12,857.0 73.0 04:06 06:12 Note: Spill Drill (Pits) 9/20/2017 9/20/2017 1.20 COMPZ4 CASING PULD P PJSM, Flow check well, lay down BHA 73.0 0.0 06:12 07:24 # 39, Ahchor billet running tools 9/20/2017 9/20/2017 0.70 PROD5 STK PULD P PJSM, M/U BHA #40 to kick off liner 0.0 72.2 07:24 08:06 top billet with 1.7° motor RR HYC bi center, M/U to coil and surface test. Change packoffs, swap out UOC checks 9/20/2017 9/20/2017 2.30 PROD5 STK TRIP P RIH BHA #40 72.2 12,595.0 08:06 10:24 9/20/2017 9/20/2017 0.10 PROD5 STK DLOG P Log K1 for+7' correction 12,595.0 12,629.0 10:24 10:30 9/20/2017 9/20/2017 0.10 PROD5 STK TRIP P RIH 12,629.0 12,700.0 10:30 10:36 9120/2017 9/2012017 1.70 PROD5 STK TRIP P Park and displace well back to 8.8 12,700.0 12,700.0 10:36 12:18 PPG PwrPro 9/20/2017 9/20/2017 0.10 PRODS STK TRIP P Close EDC, PUW=33K, Trip in, clean 12,700.0 12,745.0 12:18 12:24 1 1 1 pass through window 9/20/2017 9/2012017 0.10 PROD5 STK DLOG P Log RA for -2.5' correction 12,745.0 12,749.0 12:24 12:30 9/2012017 9/20/2017 0.20 PROD5 STK TRIP P Continue in hole, Dry tag billet @ 12,749.0 12,818.0 12:30 12:42 12818, PUH 9/20/2017 9/20/2017 0.90 PROD5 STK KOST P Bring pups on line, 1.69 BPM @ 4320 12,818.0 12,818.5 12:42 13:36 PSI FS, BHP=3945, RIW=13.1K, start milling @ 12817, made 12818.5 then had multiple stalls, reduce pump rate to 1.4BPM and work through 9/20/2017 9120/2017 5.00 PROD5 STK KOST P Go to 2 FPH, continue to stall, working 12,818.5 12,819.0 13:36 18:36 multiple TF's, decision made to POOH & PU agitator 9/20/2017 9/20/2017 2.40 PRODS STK TRIP P POOH for agitator, park above 12,819.0 72.0 18:36 21:00 window, open EDC, swap from choke A to choke B, choke fully open though still holding -1000 psi pumping minimum rate, trouble shoot, tag up 9/20/2017 9/20/2017 2.20 PROD5 STK PULD P Continue to trouble -shoot choke issue. 72.0 0.0 21:00 23:12 Decison made to PUD, then continue to trouble shoot issue once on MP, checks not holding, continue PUD, open & cleaned choke A & B (significant large, rounded, shale . pieces & aluminum in both chokes) 9/20/2017 9/21/2017 0.80 PRODS STK PULD P Reconfigure BHA, PJSM, PD BHA# 0.0 50.0 23:12 00:00 41 (New B8 XD Edge bit, 1.7-° AKO motor, 69 hr agitator), Page 48151 Report Printed: 9/27/2017 ,. Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SIM Depth slaty Time FM Time curtly) Phase op code Adiviry cafe Time PJA operation flIKB) Ek DO*(fta) 9/21/2017 9/21/2017 1.60 PROD5 STK PULD P Continue PD BHA #41, pump across 50.0 78.0 00:00 01:36 the top, choke A & B operating as expected, change out checks, slide in cart, stab on, tag up, EDC closed 9/21/2017 9/21/2017 2.50 PROD5 STK TRIP P RIH with BHA #41, surface test 78.0 12,595.0 01:36 04:06 agitator, good, observe eratic choke swings though appears to clear up; possible cuttings from down -hole, nothing unusual observed over shakers 9/21/2017 9/21/2017 0.20 PROD5 STK DLOG P Log K1 for+2.5' correction 12,595.0 12,632.0 04:06 04:18 9/21/2017 9/2112017 0.30 PROD5 STK RGRP T Park at 12,632' (install new seats mud 12,632.0 12,632.0 04:18 04:36 pump #2), PUW=32K 9/2112017 9/21/2017 0.30 PROD5 STK TRIP P Continue RIH, stack -9K WOB at 12,632.0 12,820.0 04:36 04:54 window, PU, drop rate, RBIH without issue, log RA tag for D' correction 9/21/2017 9/21/2017 0.20 PROD5 STK KOST P Dry tag 12,820.5', RBIH to continue 12,819.4 12,819.4 04:54 05:06 milling, pumping 1.7 bpm, FS = 1323 psi, circ pressure = 5321 psi, CWT =11 K, WOB =.22K, Start milling @ 12819.4 9/21/2017 9/21/2017 1.00 PROD5 STK KOST P Milling off billet, 1.69 BPM @ 5011 12,819.4 12,821.0 05:06 j 06:06 PSI FS, BHP -3935, 1 FPH, 9/21/2017 9/21/2017 0.50 PROD5 DRILL DRUG P Go to 10-15 FPH, 1.7 BPM @ 5011 12,821.0 12,828.0 06:06 06:36 PSI FS, BHP=3990 9/21/2017 9/21/2017 0.70 PROD5 DRILL DRLG P 12,828', Drill ahead, 1.7 BPM @ 5011 12,828.0 12,870.0 06:36 07:18 PSI FS, BHP=3935, RIW=IDK, DHWOB=I.9K 9/21/2017 9/21/2017 0.10 PROD5 DRILL WPRT P 12870, PUH to drift billet area, 12,870.0 12,870.0 07:18 07:24 PUW=33K, Stack on billet @ 20L, clean @ 30L, RBIH to drill 9/21/2017 9/21/2017 1.40 PROD5 DRILL WAIT T Pull off bottom - exploring different, 12,870.0 12,870.0 07:24 08:48 well plan options - Ream billet area, Dry drift clean 9/21/2017 9/21/2017 2.50 PROD5 DRILL DRUG P Drill ahead working WP4, 1.79 BPM 12,870.0 13,230.0 08:48 11:18 @ 5430 PSI FS, BHP=3960 9/21/2017 9/21/2017 2.90 PROD5 DRILL TRIP P - Call end of build, Pump sweeps, Trip 13,230.0 78.0 11:18 14:12 out for lateral BHA, PUW=31 K 9/21/2017 9/2112017 1.40 PROD5 DRILL PULD P At surface, PJSM, PUD BHA #41 78.0 0.0 14:12 15:36 9/21/2017 9/21/2017 1.90 PROD5 DRILL PULD P P/U New bit, C1 with 3D cutters, .5" 0.0 78.0 15:36 17:30 motor, and agitator. PD BHA #42 AL3 lateral drilling BHA. Make up to coil ' and surface test. Check packoffs 9/21/2017 9/21/2017 2.50 PROD5 DRILL TRIP P RIH, surface test agitator, good, slack 78.0 12,595.0 17:30 20:00 weight on GLM at 3,533', PU, reorient TF, continue in-hole 9/21/2017 9/21/2017 0.20 PRODS DRILL DLOG P Log K1 for+4.5' correction 12,595.0 12,635.0 20:00 20:12 9/21/2017 9/21/2017 0.40 PROD5 DRILL TRIP P Continue RIH 12,635.0 13,230.0 20:12 20:36 9/21/2017 9/21/2017 2.80 PROD5 DRILL DRLG P OBD, FS = 1130 psi, CWT = 8K, WOB 13,230.0 13,630.0 20:36 23:24 = 1.51K, rate in = 1.75 bpm, BHP = 3987 psi, pump sweeps, average ROP over interval = -143 fph 9/21/2017 9/21/2017 0.30 PROD5 DRILL WPRT P WT up -hole, PUW = 32K 13,630.0 12,879.0 23:24 23:42 Page 49/51 Report Printed: 9127/2017 ANft- Operations Summary (with Timelog Depths) 3M-27 qW Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log smrt Depen SMMM I EM Tuna Dur (hr) Phase Op Cotle Activity Cme Time P -T-% Operaaon (NB) End De MMQ3) 9/2112017 9122/2017 0.30 PRODS DRILL WPRT P WT in-hole, RIW = 6K _ 12,879.0 13,630.0 23:42 00:00 9/22/2017 9/22/2017 3.80 PRODS DRILL DRLG P BOBD, FS = 1190 psi, pumping 1.78 13,630.0 14,051.0 00:00 03:48 bpm, CWT = 4.5K, WOB = 1.51K, BHP = 3964 psi, circ pressure = 5399 psi. Begin swapping to mud System #7 at 13,760', new mud at the bit at 13,816', pump sweeps, ROP over interval = 111 fph 9/22/2017 9/22/2017 0.50 PRODS DRILL WPRT P Wiper up -hole, PUW = 35K 14,051.0 13,050.0 03:48 04:18 9/222017 9122/2017 0.40 PRODS DRILL WPRT P Wiper in-hole, RIW = SK 13,050.0 14,051.0 04:18 04:42 9/22/2017 9/22/2017 1.20 PRODS DRILL DRLG P BOBO, FS = 1120 psi, pumping 1.8 14,051.0 14,182.0 04:42 05:54 bpm, CWT = 4.71K, WOB = 1.31K, BHP = 3952 psi 91222017 9/22/2017 0.10 PRODS DRILL WPRT P 14182', BHA Wiper, PUW=37K 14,182.0 14,182.0 05:54. 06:00 9122/2017 9/22/2017 0.90 PRODS DRILL DRLG P 14182', Drill, 1.79 BPM @ 5105 PSI 14,182.0 14,275.0 06:00 06:54 FS, BHP=4010, RIW=2.2K, DHWOB=I.9K 9122/2017 9/22/2017 0.10 PRODS DRILL WPRT P 14275', BHA Wper, PUW=37K 14,275.0 14,275.0 06:54 07:00 9/222017 922/2017 1.40 PRODS DRILL DRLG P 14275', Drill, 1.79 BPM @ 5105 PSI 14,275.0 14,425.0 07:00 08:24 1 FS, BHP=4015 9/222017 9/2212017 3.40 PRODS DRILL WPRT P 14425 call TD, Chase 10 X 10 BBL 14,425.0 78.0 08:24 11:48 sweeps to swab valve, PUW=35K 9/22/2017 92212017 PRODS DRILL WPRT P Tag up at surface, reset counters, Trip 78.0 12,595.0 11:48 11:48 in hole 9/222017 9/22/2017 2.20 PRODS DRILL DLOG P Log K1 for +1.5'correction, PUW=35K 12,595.0 12,627.0 11:48 14:00 9/22/2017 9/22/2017 1.50 PRODS DRILL WPRT P Continue in hole, clear pass through 12,627.0 14,427.0 14:00 15:30 window, set down @ 12818 at 20 left, went to 30L clean past 9122/2017 9/222017 3.50 PRODS DRILL CIRC P Tag 14427' corrected, Trip out 14,427.0 78.0 15:30 19:00 pumping 12 PPG beaded liner pill followed by 12 PPG completion fluid. Paint EOP flags @ 12400, 10400' 9/22/2017 92212017 1.50 PRODS DRILL PULD P Flow check well, good, PJSM, LD 78.0 0.0 19:00 20:30 BHA #42 (Cl bit came out a 2-1) 9/222017 9/222017 2.90 COMPZS CASING PUTB P PJSM, PU AU liner (non -ported bull- 0.0 1,871.0 20:30 23:24 nose, 47 jnts slotted liner, & shorty deployment sleeve), BOP Drill "Running Liner' 9/22/2017 9/23/2017 0.60 COMPZS CASING PULD P PJSM, PU BHA#34, AL3 Liner 1,871.0 1,915.0 23:24 00:00 Running Tools 9123/2017 9/23/2017 0.70 COMPZS CASING PULD P Continue PU BHA 943, replace 1,915.0 1,915.0 00:00 00:42 checks, move in cart, MU to coil 9/23/2017 9/23/2017 3.00 COMM CASING RUNL P RIH with BHA #43, tie into window flag 1,915.0 14,427.0 00:42 03:42 for+8.5' correction, weight check at window = 31 K Set downs at 13,920', 14,157', 14,267',14,384', &14,397' Tied into TO flag for O' correction, arrive at setting depth, weight check = 40K, bring up pumps, release off liner, TOL = 12,556' Page 50151 Report Printed: 912 712 01 7 e Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stat Depth. SW rime Eod rime Dw (hh Phase Op Code Activity Code rime P -T -X ope�abon WEn End Depff, MB) 9/23/2017 9/23/2017 0.40 COMPZ5 CASING DLOG P Obtain SBHP, tool MD = 12,546', tool 14,427.0 12,541.0 03:42 04:06 TVD = 6,072', annular reached 3774 psi after 20 minutes, 11.95 ppg equivelant 9/23/2017 9/23/2017 3.80 COMPZ5 CASING TRIP P Begin pumping seawater down coil, 12,541.0 12,541.0 04:06 07:54 displace well to seawater, diesel freeze protect from 2500' 9/23/2017 9/23/2017 1.40 COMPZ5 CASING PULD P At surface, PJSM PUD BHA #43, 12,541.0 53.0 07:54 09:18 Liner running tools, lay down tools and pull checks from UQC 9/23/2017 9/23/2017 0.70 DEMOB WHDBOP RURD P Stab back on. Flush rig and jet stack, 0.0 0.0 09:18 10:00 unstab from well 9/23/2017 9/23/2017 1.50 DEMOB WHDBOP MPSP P PJSM, R/U BPV lubricator, set BPV, 0.0 0.0 10:00 11:30 lest plug. RID BPV lubricator and load out 9/23/2017 9/23/2017 4.50 DEMOB WHDBOP NUND P Start working RDMO check list, empty 0.0 W) 11:30 16:00 pits, Nipple down stack, Check tree bolts Page 51151 Report Printed: 9127/2017 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2-01 50-029-22637-62 Baker Hughes INTEQ Definitive Survey Report O6 October, 2017 BA ER F�UGHES E— -, ConoeoPhillips ConoeoPhillips DeRnglye Survey Report Company: ConocoPhidips (Alaska) IM. -KuP2 Loul Co-ordinate Rer.reoce: PropcF Kupamk R,.UnB TVD Reference: She: Kupmuk 3rd Pad MD Rarercnce: Well: 3M.27 North Reference: Wellhae: 3rd -27 SYNey Calculation Method: Design: 3M-27 DaNW.: Propel Kuparuk River Unit, Noah Slope Alaska, United Stages Map System: US State Plane 1927 (0am Solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) hard) Map Zone: Make Zone 04 Well W-27 Well Position +1114 00o usft Northing: .v -W 0.00 usft Sued., Push... Uncertainty 0.00 use Wellhead Elevation: Welihost SM-27AL2-01 Magrretice Model Name Sample Data BGGM2016 7/1/2017 Design SM-27AL2-01 Audit Notes: Version: 1.0 Phase: ACTUAL Wrtkal Section: Depth Fran (M)) (dall) 38 00 Wall 3W27 314-27 C 66.00uaft (3M-27) 3W27 ® 66.00usft (3M@7) Thus Minimum CunMum EDTMaska Sandbox Mean Sea Level Using Well Reference Point Using ... same, scab redo, 6.016.606.24us11 506.294.30usft usft Te On Depth: 13.324.63 +WS vm (usnl hard) 000 0.00 Latitude: Longitude: Ground Level: Dip Angle fl 61 00 Dioxides (') 320.00 h't 70° 2T 23.753 N 148° 56' 55.073 W 0,00 hall Field Shangth ron 57.543 lGV?O17 4:21:54PM Page 2 COMPASS 500014 SudE 35 1. ConocoPhillips • Con0C0P11ll1ps Definitive Survey Report Company: ConomPtillips(Alaska) Inc. -Kup2 Local Co-ordinate Reference: Mil 310-27 Project: KOMI Riwr Unit TVD Reference: 3M-27®60.00usft(3M-27) Sita Kupamk 3M Pad MD Reference: 3M-27 a OnOousft(3M-27) Well: 3M-27 Norm Reference: True Welb0la: 3M-27 Survey Calculation Method Minimum Curvtlufe Deals.: 3M-27 Dalabaam EDTAlawn Sandbox Suney limpam Dab 9/2512017 Frain To Survey Survey (191/) loan) Survey (Wellbore) Tool Name Description Sbrt Dab End Oate 26800 12,692.45 3M-27 (3M-27) MWD MWD- Standard 111512001 12,712.50 12,746.03 3M -27A MW INC(0MQ7A) MWD -INC ONLY MWD -INC ONLY FILLER W1812017 WIWM17 12,778A7 13,145.03 SIA -27A MIND (3M -27A) MWD MWD- Standard 8I18Y1017 MSIM17 13,150.40 13,239.31 3M-27AL2P81 MWD-INC(3M-27AUPB1 MWD-INCONLY MW41NC_ONLY FILLER 8/1912017 8/2912017 13270.82 13,324.83 311A -V7 PBI MM(5M-27AL2PB1) MWD MWD- Standard 81291209 0 lIM17 13,327.0 13.390.70 3M27AL2-01 MWD -INC (3M-27AL2-OI) MWD -INC ONLY MW INC _ONLY _FILLER 9/&2017 GAV2017 13,420.52 15,340.17 SM-27AL2.Ot SAM(3M-27AL2.01) MWD MWD -Standard W2017 9/101209 Survey Map Map Vertical MD Inc AM lVD TVDBS eW8 ♦E/-yy NpIS) Eastin9 OLS Section (uM) 0 0 (uM) (UM) (-an) (weft) (-1100'1 Survey Tool Name .499018000 IS) (DI la1 13,Y24.&i 0800 318.19 6.292.13 6.16113 3.W253 10121 69 8.019,599.92 989.170.89 835 B,BOSb MVA (5) TIP 13327.80 97M 347,97 6.23180 6,16380 3,004.83 -10,122.37 6.019802.22 406,17040 1011 0.80837 MAD -NB CNLY(6) KOP 13.380]7 91.14 3510 0,229.12 6,181.12 3,09785 -10,12825 6,019,63533 406.164.50 2336 8,837,51 MND-1NC ONLY (6l Inbrpduded AOimUtll 13.390.70 90.63 354.30 8,2280) Si 3,07.65 -10.131.84 6,018065.03 496,160.80 80 8.46288 MVA -INC Of LY(8) Intery018tetl A2imuN 13AM 52 920 350.05 8,22775 6,15975 3,087.18 -10,135.00 6,019 694 54 499,156.80 15.= 8.887.01 MVA p1 13,4450 930 34,52 6,22841 6,155.41 3.121.78 -10.142,13 6.019.719.14 40,15056 33.80 8.91066 MYA (7) 19.e75.17 9341 339.83 8.21483 6,15863 3.149.29 -10,15178 6010,886.64 40,14080 501 0,93794 MWD (7) 13,505 23 8279 33889 822390 0,155[0 3,177.36. -10.10,41 6,019,774.70 40.130.23 4.31 8.868.27 MWD(7) 13,534.95 8963 333.83 6222.37 8155.37 320.55 -10,17037 601988187 e0, 11825 19.W 8.9978 IND(7) 13,55801 0875 33175 G=w 6.154.50 3X25.95 -10.185.37 6.019.82328 40,10723 80 9,01825 MND(7) 13508]0 91,051 333.51 6X22.29 6,16439 3,253.20 -10,189.47 8,019,8500 40.08310 713 8,04819 MM (7) 1381833 9,84 33034 6,YH 82 6,15362 3,276.88 -10,2120 6.019.07397 496.0056 12M 9,074.23 MOD (7) 1364509 9369 33730 6220.19 6.162.19 3.303 17 -10,225.0 8Plan0.45 495,0753 2160 9,10288 MND p1 13.685.28 0278 334.0 6.217.87 6,14997 3,33902 d0,N1.16 6.019.93837 40.051.34 8SO 9,140.73 MMD(7) 13.705.82 9282 33372 6,21697 6.10,97 3.35788 -10.250.19 60199•ues 40130 177 9,16081 MAD (7) 13,737.16 9195 327.65 6,215]5 6,14775 3,38473 -10,0552 60198010 496.026.95 1970. 9.191.40 MVA(7) IOW017 4;21; 54PM Peal 3 COMPASS 500014 Bund 85 �. ConocoPhillips Co11oCo�11lfips Definitive Survey Report Com": Cono9DPhalips Waskd) Inc. -Kup2 Local Co-ordinate Rmrehwe Well 3M-27 Project: Kupamk River Unit TVD Reference: 3M-27 Q 68.00usfl (3M-27) see'. Kupamk 3M Ped MO Reference: 3M -2T C 6800usfl(3M-27) Well: 3M37 North Reference: Tr9a Wellbore: 3101-27 Survey Calculxion Method: Minimum Curv9nm Design: 3101-27 Database: EDT Alaska Sandbox Survey Arn61aticn 1OW017 4:21: 54PM Pope 4 COMPASS 5000.14 Build 85 Me al MD Inc At, TVD TVDSS +we +EFW Northing fleeting D� Section Survey Tool Name loan) (1) l9 Ptft) (us") (UM) (then) (n) 11n 1.1166'1 (R) 131.. 01 A 32090 6,21485 6,146.85 3400.81 -10.281.02 8.020.00703 458.01143 4.28 9,220.58 Mold) (7) 13,]98.53 .49 33158 6,21320 8,14520 3AM70 -10.20502 6,OID,032.to 495.905,81 1261 9.249.93 MWD(7) 13.828.30 9189 332N 6.211.40 6,14346 3489.75 -10.310.60 6.020.0W 94 49898181 9.03 9,28104 MM (7) 13.652.78 83.81 33613 6.21056 6,14258 3.48568 -10.32140 5,020.052.85 495.970.99 18.39 9,30AN MND(7) 13,38452 9353 33824 6,20805 5.140.38 3,514.91 -1033370 5,02911207 495,958.67 124 9,31495 MM (7) 13,914.29 9221 310.25 5,207.37 5.139.37 3.54271 -10,344.23 ..='l. de 485,948.11 0.10 9,363.02 MWD (7) 13,944 21 89.75 141.74 6$0686 6.138.14 3,57100 -10,35397 6.M 168,13 495.938.35 959 9,39095 MVA (7) 1397583 9120 33958 62M 50 6.138.56 3.000.83 40.384.4 6,02,197.95 495,92786 833 9,420w MND (7) 14.004.11 0.0 33386 6,2604 6,138.04 3626 To -10,37561 6,02.223.80 495.91865 214 9,44760 MM (7) 1402712 89.88 3.07 6,2585 6.13780 3647.10 -10,388.42 602244.2 495,80584 17,08 9.470.10 MM (7) 14,080.03 9159 33025 6.2543 6.137.43 3.675A -10,402.80 6.02,27272 495,889.4 553 9,50249 MWD (7) 14.090.10 95.4 3245 6,2356 8,13556 3.701.59 -10.417,87 6,030,298.85 49507435 1215 0.53205 MMA(7) 14122.09 9585 32737 6,199.64 6,131.64 3,M863 -10AM49 6020.325.58 495.057]0 11.93 9.1434(1 WAD (7) 14,15327 9900 32931 6104.M 8.126,72 3.754.83 -10,400,66 6.020.35187 49504152 5.72 9.593.92 MNO (7) 14164,43 90.33 32500 8.16962 6.121.62 3.780.74 -10,46710 6020.37776 49682/97 11]5 9,82430 MM (7) 14.209.01 9773 320.06 6.185.97 6,11787 3.86020 -10.481,74 6,020,38731 485.81040 2015 9,84856 MVA) (7) 1424020 .Q 3111. 6.18260 6114.80 3,02385 -10,50151 6,024283 495.790.61 12.94 9679.4 MWD (7) 14.2712 82.39 31608 6,18105 8,11305 3,545.95 -10,522.53 6.024391 495,769.57 11.00 9,71069 MND(7) 14.3 Be 82. 3130 6,17980 5.11190 388256 -10,54346 8,02,454W 495.74863 10.42 9139.93 MM (7) 14,330,31 9135 31032 6,179.01 6.11101 388724 -10,505.57 6.0248417 495,72850 940 0,96972 MVA (7) 14,30A8 8181 2751 617816 6,110.16 3.906.19 -10,589.04 6,0Q0,503W 495,70302 943 9.79881 MMA(7) 14,300148 91.57 30472 6,17730 6,10930 3923.85 -10,81324 6,0252073 495,67881 934 9,827.W MWD(7) 14,42104 9252 302.85 6,176.13 6.10943 3.WN -10,63864 6.02,53769 495,653.40 7.35 9,857.24 MAD (7) 14451.92 9249 30.17 6,17410 6.1..70 3.956.95 -10W494 6,020.55379 405,02700 974 9,88649 MNO (7) 1448084 too. 2797 6,173.55 elow 3.970.90 -10.690.02 6,020,567]1 495,00200 7,78 9.913.30 MM (7) 145. .54 92.24 296.31 6.172.57 6,104.57 3,90271 -10,71305 5,020.579.50 495,57896 843 903714 MM (7) 14.539.48 to" 28944 6.17117 6,103.17 3,990.08 -10142,12 6,W.'eN 8A 495.54988 958 9,Wen MM (7) 1457041 93.35 30235 6.169.55 6,101.55 4,01395 -1676964 5.030.51069 495,523.35 967 999881 MM (7) 14,500.38 94.41 30553 6.167.78 8.09978 400065 -10.7045 6,02,627.37 495.49952 10.50 10,02,55 MND(7) 14.630.56 8442 3102 6,16572 5,00772 4,019.13 -10,817.22 8.000.64502 495.17475 1580 10.05490 MM (7) 14.66049 9551 31287 6,163.13 6.09513 4,06890 -10,639.14 6.(ol 49545241 9. 10,08447 MAID (7) Arn61aticn 1OW017 4:21: 54PM Pope 4 COMPASS 5000.14 Build 85 Survey MO ConocoPhillips AEI ConocoPhillips Definitive Survey Report Company: ConocoP0i11ips(Alaska) up.-Kup2 Local Co-ordinate Retannce: Well 3M 27 Project: Kupatok Riw Unit ND Reference: 3M.27®66.Muth (3M27) Site: Kupamk 3M Pao MD RMemnce: 3M-27 C 68.00usft(3M-27) Well: 3M 27 North Reference: True Wellbore: 3.27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDTAMske Squalti Survey MO Inc AEI ND 14056N14 aE/-w Map Map DLS Vertical Northing setting Section Surrey Tool Name (usft) (I r) pti (uaR) (usll) join) (h) (e) (°/100') (ft) 14,69102 9473 316.37 0.160.37 6092.37 0.090.53 -1Ditcl 6 6020,68].19 49543047 1155 16,11514 MWD (7) 1472105 9304 31904 J. as 600.0 4,11240 -10,801.35 8,020.70901 495410.57 1065 10,1.87 M00(7) 14,75283 90" 32060 615]33 6,06933 4,137. -10,90097 6020.733 97 495390.92 1900 10.17641 MIND (7) 14)81 00 .. 324.32 6.15700 8.099.09 4.160 28 -10.91TU 0,020,75666 4853/454 1. t0.A4A9 MVA(7) 14.81073 8970 327.12 6.15720 6.069.20 4,184.85 -10,9407 6.00143 495.35]78 1001 10.234ID MVA(7) 14.840.6 660 Mon 0,16768 6089. as 4,21043 -to,W959 6,020.67,00 485.34225 10.95 10,203.64 mm (7) 14,87205 8780 32671 6,15054 6050.54 4.23748 -10.0549 6.020,834.03 485,3'16.33 60 18294.50 MMP(7) 14.01,17 8662 32726 6.15943 508143 4,25216 -10.0092 8.020,858]0 485.31088 5.59 10,32341 MVA(7) 14.Q?W saw 32509 816021 6.021 4,284.38 -10.99570 8.02088088 485,20 98 841 10349.07 MVA(7) 805.45 8797 32273 6,161.18 6.093.18 4,30.60 -11,01201 6.020,903.11 49527976 8.0 pi 43 MVA(7) 14,880.6 8778 32181 8,162.11 x084.11 4,30.55 -11.02745 0,020,823.04 485264.31 371 10,402.64 MM (7) 15.01074 0763 31937 6,16331 6,095.31 4.34075 -11.651 8014,946.22 .624523 a13 10,432.6 MAD (7) 15,04039 8733 31637 6.16481 6.088.61 4.37171 -11.0637 6.020.08.17 405,225.34 10.10 10462.0 M (7) 15,071.17 6003 31434 6.165 86 6.0976 4.393.% ,11,08789 patches 03 49520312 697 10.492.91 MYW(7) 15,16.7 0800 311.14 BASS." 6,098.88 44136 -1119864 6,021,010.01 40.182.05 1084 10,522.15 Mao (7) 15,13045 9114 31115 8.167.11 5099.11 4,433.19 -11132.0 6,021,029.50 4015901 10.54 10.55157 MAD (7) 15,1600 0953 31050 6.16.0 6.098.0 1.452.82 -1111 St" 6,021.04919 49513988 548 10,6121 MAI) (7) 15418941 06.74 310.02 5167.32 6.099.32 4,471.52 -11,1766 6,021.051 485.11478 349 10.699]2 MM 17) 1522023 85.M 67.91 6,1680 6,16.0 4,49D 87 -1120070 8,021.6720 495.090 65 1292 10,61193 MM (7) 1515023 8221 W760 6.17215 8.104.15 4,50.13 -11X14.36 6.71.1643 405,081 10.55 10.689.7 MAID (7) 15.281.23 8030 30.27 6,17884 Si 0,527.54 -11,2466 8.71,12382 495,04275 727 10,88882 MM (7) 15.305.34 806 304.92 618093 6.112.0 4,541:37 -11.268.17 6.02113764 495,023.42 5.6 18810 MM (7) 15.340.17 8032 30229 6,11.'.6 611688 455036 41,20.75 8.021,166 4WaWA3 747 10,7H65 MAD (7) 15,36.. 8032 30299 6,19356 8,12555 4,581.34 -11,329.84 8,021.17755 48486102 06 10.79226 PRWECTEDWTD Annotation BA 10 0174:21: 54P10 PaOs5 COMPASSS0001419dWSS To: RECEIVED OCT 16 2011 AOGCC SES a U company Letter of Transmittal Date: nAYA L0.3CED October 16, 2017 CD in 217-053 s°K `BEND R Makana Bender AOGCC 333 West 711 Ave, Suite 100 Anchorage, Alaska 99501 From: Yosha Ragbirsingh / Michael Soper Baker Hughes, a GE Company 795 East 94`h Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3M -27A 3M-27AL1 3M-27AL2PB1 3M-27AL2 3M-27AL2-01 3M-27AL3 2A -22A 2A-22AL1 (8) Total prints 217-053 28680 217-054 28681 217-055 28682 217-055 28683 217-056 28684 217-057 28685 Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael.Soper@BHGE.com Yosha Ragbirsingh, Baker Hughes, Survey Manager Yosha.Ragbirsin14h(cbBHGE.com ConocoPhillips RECEIVED OCT 16 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2-01 50-029-22637-62 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 217-056 28684 BA, ICER UGHES a GE company 10/612017 4:21:54PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips BA ER ConocoPhillips p Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 31V-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Project Kuparuk River Unit, North Slope Alaska, United Slates Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 3M-27 Well Position +Nl-S 0.00 usft Northing: 6,016,606.24 usft Latitude: 70° 27' 23.753 N +El -W 0.00 usft Basting: 506,294.30usft Longitude: 149° 56' 55.073 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3M-27AL2-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2016 7/1/2017 17.53 81.00 57,543 Design 3M-27AL2-01 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 13,324.63 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 68.00 0.00 0.00 320.00 10/612017 4:21:54PM Page 2 COMPASS 5000.14 Build 85 Survey ConocoPhillips ER 0 ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 310-27 Project Kuparuk River Unit Map TVD Reference: 310-27 @ 68.00usft (3M-27) Vertical Site: Kuparuk 3M Pad Inc MD Reference: 3M-27 @ 68.00usft (3M-27) NDSS +N! -S 3 Well: 3M-27 Easting North Reference: True I! Wellbore: 3M-27 (°) Survey Calculation Method: Minimum Curvature (usft) (usft) Design: 3M-27 (°1100' ) Database: EDT Alaska Sandbox Annotation Survey Program Date 9125/2017-������� (ft) (ft) From To 13,324.63 Survey Survey 6,232.13 j (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date MWD (5) 265.00 12,69245 3M-27 (3M-27) MWD MWD -Standard 1/15/2001 3,004.83 -10,122.37 6,019,602.22 496,170.40 10.11 8,808.37 MWD -INC ONLY(6) KOP 13,360.77 91.14 12,712.50 72,748.03 3M -27A MWD -INC (3M -27A) MWD-INC_ONLY MWD -INC -ONLY -FILLER 8/18/2017 8/18/2017 23.36 12,778.47 13,145.03 3M -27A MWD (3M -27A) MWD MWD -Standard 8/18/2017 8/26/2017 6,160.60 13,150.00 13,239.31 3M-27AL2PB1 MWD -INC (3M-27AL2PB1 MWD -INC -ONLY MWD -INC -ONLY -FILLER 8/29/2017 8/29/2017 Interpolated Azimuth 13,270.82 13,324.63 3M-27AL2PB1 MWD(3M-27AL2PB1) MWD MWD -Standard 8/29/1017 8/31/2017 6,019,694.54 13,327.00 13,390.70 3M-27AL2-01 MWD -INC (3M-27AL2-01) MWD -INC ONLY MWD -INC -ONLY -FILLER 9/8/2017 9/8/2017 341.52 13,420.52 15,340.17 3M-27AL2-01 MWD(3M-27AL2-01) MWD MWD -Standard 9/8/2017 9/18/2017 Survey Map Map Vertical MD Inc Azi ND NDSS +N! -S +E/ -W Northing Easting DLS Section (usft) V) (°) (usft) (usft) (usft) (usft) (°1100' ) Survey Tool Name Annotation (ft) (ft) (ft) 13,324.63 98.09 348.19 6,232.13 6,164.13 3,002.53 -10,121.89 6,019,599.92 496,170.89 6.35 8,806.30 MWD (5) TIP 13,327.00 9799 347.97 6,231.80 6,163.80 3,004.83 -10,122.37 6,019,602.22 496,170.40 10.11 8,808.37 MWD -INC ONLY(6) KOP 13,360.77 91.14 351.90 6,229.12 6,161.12 3,037.95 -10,128.25 6,019,635.33 496,164.50 23.36 8,837.51 MWD-INC_ONLY (6) Interpolated Azimuth 13,39070 90-83 354.30 6,228.60 6,160.60 3,067.65 -10,131.84 6,019,665.03 496,160.88 8.08 8,862.58 MWD -INC _ONLY (6) Interpolated Azimuth 13,420.52 92.43 35095 6,227.75 6,159.75 3,097.18 -10,135.90 6,019,694.54 496,156.80 15.22 8,887.81 MWD (7) 13,445.96 93.60 341.52 6,226.41 6,158.41 3,121.78 -10,142.13 6,019,719.14 496,150.55 33.80 8,910.66 MWD (7) 13,475.17 9341 339.83 6,224.63 6,156.63 3,149.29 -10,151.78 6,019,746.64 496,140.88 5.81 8,937.94 MWD (7) 13,505.23 92.79 338.69 6,223.00 6,155.00 3,177.36 -10,162.41 6,019,774.70 496,130.23 4.31 8,966.27 MWD (7) 13,534.95 89.63 333.83 6,222.37 6,154.37 3,204.55 -10,174.37 6,019,801,87 496,118.25 19.50 8,994.78 MWD (7) 13,559.01 89.75 331.75 6,222.50 6,154.50 3,225.95 -10,185.37 6,019,823.26 496,107.23 8,66 9,018.25 MM (7) 13,589.70 91.05 333.51 6,222.29 6,154.29 3,253.20 -10,199.47 6,019,850.50 496,093.10 T13 9,048.19 MWD(7) 13,616.33 91.84 330.34 6,221.62 6,153.62 3,276.68 -10,212.00 6,019,87397 496,080.56 12.26 9,074.23 MWD(7) 13,645.89 9369 337.38 6,220.19 6,152.19 3,303.17 -10,225.00 6,019,900.44 496,067.53 24.60 9,102.88 MM (7) 13,68528 9276 334.08 6,217.97 6,149.97 3,339.02 -10,241.16 6,019,93627 496,051.34 869 9,140:73 MWD (7) 13,705.82 92.82 333.72 6,216.97 6,148.97 3,357.44 -10,250.19 6,019,954.68 496,042.30 1.77 9,16084 MWD (7) 13,737.16 9166 32765 6,215.75 6,147.75 3384.73 -10,265.52 6,019,981.96 496,026.95 1970 9,191.40 MWD (7) 10/68017 4:21 54P Page 3 COMPASS 5000.14 Build 85 ConocoPhillips Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (3M-27) 310-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox BAER UGHES Map Map Vertical MD Inc Azi TVD TVDSS +NbS +EI -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (°11001 Survey Tool Name Annotation (ft) (ft) (ft) 13.766.66 91.84 328.90 6,214.85 6,14685 3,409.81 -10,28102 6,020,007 03 496,011.43 4.28 9,220.58 MWD (7) 13,796.53 94.49 331.58 6,213.20 6,145.20 3,43510 -10,295.82 6,020,032.90 495,996.61 12.61 9,249.93 MWD (7) 13,828.38 91.69 332.24 6,211.48 6,143.48 3,463.75 -10,310.80 6,020,060.94 495,981.61 9.03 9,281.04 MWD(7) 13,852.76 9261 336.13 6,210.56 6.142.56 3,485.68 -10,321.40 6,020,082.85 495.970.99 16.38 9,304.66 MWD (7) 13,884.52 93.53 338.24 6,208.86 6,14065 3,514.91 -10,3M,70 6,020112.07 495,958.67 724 9,334.95 MWD (7) 13,914.29 92.21 340.26 6,207.37 6,139.37 3,542.71 -10.344.23 6,020,139.86 495,948.11 8.10 9,363.02 MWD (7) ' 13,944.21 89.75 341.74 6,206.86 6,138.86 3,571.00 -10,353.97 6,020,168.13 495,938.35 9.59 9,390.95 MWD (7) 13,975.83 91.26 339.58 6,206.58 6,138.58 3,600.83 -10,364.44 6,020,197.95 495,927.86 8.33 9,420.53 MM (7) 14,004.11 90.92 333.86 6,20604 6,138.04 3,626.79 -10,375.61 6,020,223.90 495,916.66 20.26 9,447.60 MWD(7) 14,027.12 89.88 330.07 6,205.88 6,137.88 3,647.10 -10,386.42 6,020,244.20 495,905.84 17.08 9,470.10 MM (7) 14,060.03 9169 330.25 6,20543 6,13]43 3,67564 -10,402.80 6,020,272.72 495,88944 5.53 9,502.49 MM (7) 14,090.10 95.44 329.45 6,203.56 6,135.56 3,701.59 -10,417.87 6,020,298.65 495,874.35 12.75 9,532.06 MWD(7) 14,122.09 98.65 327.37 6,199.64 6,13164 3,728.63 -10,434.49 6,020,325.68 495,857.70 11.93 9,563.46 MWD(7) 14,153.27 99.50 329.31 6,194.72 6,126.72 3,754.83 -10,450.66 6,020351.87 495,841.52 6.72 9,59392 MM (7) 14,184.43 99.33 325.60 6189.62 6121.62 3,780.74 -10,467.19 6,020,377.76 495,824.97 11.76 9,624.39 MWD (7) 14,209.01 97.73 320.85 6,185.97 6,117.97 3,800.20 -10,481.74 6,020,397.21 495,810.40 20.15 9,648.66 MM (7) 14,240.00 94.02 319.33 6,182.80 6,114.80 3,823.85 -10,501.51 6,020,420.83 495,790.61 12.94 9,679.48 MWD (7) 14,271.29 92.39 316.08 6,181.05 6,113.05 3,846.95 -10,522.53 6,020,443.91 495,769.57 11.60 9,710.69 MWD(7) 14,300.69 92.09 313.03 6,179.90 6,111.90 3,867.56 -10,543.46 6,020,464.50 495,748.63 10.42 9,739.93 MWD (7) 14,330.31 91.35 310.32 6,179.01 6,111.01 3,887.24 -10,565.57 6,020,484.17 495,726.50 9.48 9,769.22 MWD(7) 14,360.48 91.81 307.51 6,178.18 6,110.18 3,906.19 -10,589.04 6,020,503.09 495,703.02 9.43 9,798.81 MWD(7) 14,390.46 91.57 304.72 6,177.30 6,109.30 3,923.85 -10,613.24 6,020,520.73 495,678.81 9.34 9,827.90 MWD (7) 14,42104 92.82 302.85 6,176.13 6,108.13 3,940.84 -10,638.64 6,020,537.69 495,653.40 7.35 9,857.24 MWD (7) 14,451.92 92.49 300.17 6,174.70 6,106.70 3,955.96 -10,664.94 6,020,553.79 495,627.09 8.74 9,886.49 SS MWD(7) t 14,48064 92.09 297.97 6,173.55 6,105.55 3,970.90 -10,690.02 6,020,567.71 495,602.00 7.78 9,913.30 Me F 14,506.54 92.24 296.31 6,172.57 6,10457 3,98271 -10,713.05 6,020,579.50 495,578.96 6.43 9,937.14 MWD(7) 14,53946 92.64 299.44 6,171.17 6,103.17 3,998.08 -10,742.12 6,020,594.85 495,549.88 9.58 9,967.61 MWD (7) 14,570.41 93.35 302.35 6,169.55 6,101.55 4,013.95 -10,768.64 6,020,610.69 495,523.35 9.67 9,996.81 MWD (7) 14,600.38 93.41 305.53 6,167.78 6,09978 4,030.65 -10,793.45 6,020,627,37 495498.52 10.59 10,025.56 MWD(7) 14,630% 9442 310.20 6,16572 6,097.72 4,049.13 -10,817.22 6,020,645.82 495,474.75 15.W 10,054.98 MWD (7) 1466049 95.51 312.87 6,163.13 6,095.13 4,066.90 -10,839.54 6,020,665.57 495,45241 960 10,08447 MWD (7) 101612017 4:21: 54PM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Annotation 8A ER IER42 10162017 4:21:54PM Page 5 COMPASS 5000 14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Eating DLS Section usft) (°) (°) (usft) (usft) (usft) (usft) (°I7001 Survey Tool Name ifti (ft) (H) 14,691.42 94.73 316.37 6,160.37 6,092.37 4,090.53 -10,86146 6,020,687.19 495,430.47 11.55 10,115.14 MWD (7) 14,72185 93.04 319.04 6,158.36 6,090.36 4,112.40 -10,881.35 6,020,70903 495,410.57 10.65 10,144.67 MWD (7) 14,752.83 90.68 324.60 6,157.33 6,069.33 4,137.35 -10,900.97 6,020,733.97 495,390.92 19.00 10,176.41 MWD (7) 14,781.00 90.34 324.37 6,157.08 6,089.08 4,16028 -10,917.34 6,020,75688 495,374.54 1.46 10,204.49 MM (7) 14,810.73 89.20 327.12 6,157.20 6,089.20 4,184.85 -10,934.07 6,020,781.43 495,357.79 1801 10,234.07 MWD (7) 14,840.66 88.96 330.39 6,157.68 6,089,68 4,210.43 -10,949.59 6,020,807.00 495,342.25 10.95 10,263.64 MWD (7) 14,872.05 87.88 328.71 6,158.54 6,090.54 4,237.48 -10.96549 6.020,834 03 495,326.33 6.36 10,294.58 MNIl](7) 14,901.17 88.62 327.26 6,159.43 6,091.43 4,262.16 -10,980.92 6,029,858.70 495,310.88 5.59 10,323.41 MWD (7) 14,927.90 88.03 325.09 6,160.21 6,092.21 4,284.36 -10,995.79 6,020,880.88 495,295.99 8.41 10.349.97 MWD (7) 14,955.45 87.97 322.73 6,161.18 6,093.18 4,306.60 -11,012.01 6,020,903.11 495.279.76 8.56 10,377.43 MWD(7) 14,980.69 87,79 321.81 6,162.11 6,094.11 4,326.55 -11,027.45 6,020,923.04 495,264.31 3.71 10,402.64 MWD (7) 15,010.74 87.63 319.37 6,163.31 6,095.31 4,349.75 -11046.51 6,020,946.22 495,245.23 8.13 10,432.66 MWD (7) 15,040.39 87.33 316.37 6,164.61 6,096.61 4,371.71 -11,066.37 6,026,968.17 495,225.34 10.16 10,462.26 MWD (7) 15,077.17 8803 314.34 6,165.86 6,097.86 4,393.59 -11,067.99 6,020,990.03 495,203.72 6.97 10,492.91 MWD (7) 15,100.67 88.00 311.14 6,166.88 6,098.88 4,413.60 -11,109.64 6,021,010.01 495,182.05 10.84 10,522.15 MWD(7) 15,130.45 91.14 311.15 6,167.11 6,099.77 4,433.19 -11,132.06 6,021,029.58 495,159.61 10.54 10,551.57 MWD (7) 15,160.47 8963 310.50 6,186.90 6,098.90 4,452.82 -11,154.77 6,021049.19 495,136.88 5.48 10,581.21 MWO(7) 15,189.41 88.74 310.02 6,167.32 6,099.32 4,471.52 -11,176.85 6,021,06787 495,114.79 3.49 10,609.72 MWD (7) 15,220.23 85.36 307.91 6,168.90 6,100.90 4,490.87 -11,200.78 6,021,087.20 495,090.85 12.92 10,639.93 MWD(7) 15,25023 82.21 307.60 6,172.15 6,104.15 4,509.13 -11,224.36 6,021,10543 495,06726 10.55 10,669.07 MWD (7) 15,281.23 80.38 305.27 6,176.84 6,108.64 4,527.54 -11,248.85 6,021,12382 495,042.75 7.27 10,698.92 MM (7) 15,305.34 8088 304.92 6,180.93 6,112.93 4,541.37 -11,268.17 6,021,137.64 495,023.42 566 10,721.93 MM (7) 15,340.17 80.32 302.29 6,186.86 6,11886 4,560.36 -1129675 6,021,15660 494,994.83 7.47 10,754.85 MWD (7) 15,380.00 80.32 302.29 6193.56 6,125.56 4,581.34 -11,329.94 6,021,177.55 494,96162 0.00 10,792.26 PROJECTED to TO Annotation 8A ER IER42 10162017 4:21:54PM Page 5 COMPASS 5000 14 Build 85 BA ER PRINT DISTRIBUTION LIST F UGHES a GE company COMPANY ConceoPhillips Alaska, Inc R CCC �® ( WELL NAME 3M-27AL2-01 G �' OCT 13 2017 FIELD Greater Kuoaruk Area 21 7056 28659 Please sign and return one copy of this transmittal form to: CocoPhillips Alaska, Inc. I TOsterkamp (WNS Petroleum Technician) DATA LOGGED 700 G Street. %Q/%'$/2011 Anchorage, Alaska 99510 Id.K BENDER to acknowledge receipt of this data. COUNTY North Slope Borough AOGCC LOG TYPE BHI DISTRICT Alaska -RES LOG DATE September 22, 2017 AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider@bakerhughes.com TODAYS DATE October 11, 2017 Revision CD in 217-053 STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FEDEx WILL NOT DELIVER TO P.O. WX) PERSON ATTENTION V t BP North Slope. FOA, PROC. PRR-20 (Office 109) D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Tom Osterkamp ATO 3-344 700 G Street Anchorage, AK 99510 3 F.xxonMobil, Alaska Atm: Lynda M. Vaskell andfor Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR -Division ofOil & Gas ... Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 •*• Stamp "confidential" on all material deliver to DNR 6.BP Exploration (Alaska) Inc. Petrotechnical Data Center, tR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 FIELD I FINAL CD/DVD FINAL PRELIM (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRIN ur rKIN # OF COPIES j#OFGOPIES # OF COPIES 0 0 0 0 0 0 1 0 1 1 1 1 1 0 TOTALS FOR THIS PAGE: 0 2 3 3 0 ConocoPhillips RECEIVED OCT 13 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2-01 50-029-22637-62 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 BA ER F�UGHES a GE company 217056 28659 r ConocoPhillips BAUGNEs ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Project Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 Well Position -N/-S 0.00 usft Northing: +E/ -W 0.00 Usti Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Waltham 3M-27AL2-01 Magnetics Model Name Sample Date BGGM2016 7/1/2017 Design 3M-27AL2-01 Audit Notes: Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) (usft) 68,00 Well 3M-27 3M-27 @ 66 00usft (3M-27) 3M-27 @ 68.00usft (310-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,016,606.24usft Latitude: 506,294.30 usft Longitude: usft Ground Level: Declination (1 17.53 Tie On Depth: 13,324.63 -N/-S (usft) 0.00 -E/-W (usft) 0.00 Dip Angie (°I 81.00 Direction (1) 320.00 70" 27'23.753 N 149° 56'55.073 W 0.00 usft Field Strength (nT) 57,543 104612017 4: 21: 54PM Page 2 COMPASS 5000.14 Build 85 BAF�UGNES 0 Survey Survey Start Data ConocoPhillips 1/15/2001 Conoco Phillips 8/18/2017 Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit 9/8/2017 TVD Reference: 3M-27 Q 68.00usft (3M-27) Site: Kuparuk 3M Pad Easting MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 (°) North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Program Date 912512017 (ft) (ft) From To 13,324.63 98.09 346,19 (usft) (usft) Survey (Wellboro) Tool Name Description 265.00 12,692.45 3M-27 (3M-27) MWD MWD - Stantlard 12,712,50 12,746.03 3M -27A MWD -INC (3M -27A) MWD-INC_ONLY MWD -INC -ONLY -FILLER 12,778,47 13,145.03 3M -27A MWD (3M -27A) MWD MWD - Stantlard 13,150.00 13,239.31 3M-27AL2P81 MWD -INC (3M-27AL2PB1 MWD-INC_ONLY MWD -INC -ONLY -FILLER 13,270.82 13,324.63 3M-27AL2PBI MWD(3M-27AL2PB1) MWD MWD -Standard 13,327.00 13,390.70 3M-27AL2-01 MWD-INC(3M-27AL2-01) MWD-INC_ONLY MWD-INC_ONLY_FILLER 13,420.52 15,340.17 3M-27AL2-01 MWD(3M-27AL2-01) MWD MWD -Standard Survey 13,420.52 92.43 350.05 6,227.75 BAF�UGNES 0 Survey Survey Start Data End Date 1/15/2001 8/18/2017 8/18/2017 8/18/2017 8/26/2017 8/29/2017 8/29/2017 8/29/2017 8/31/2017 9/8/2017 9/8/2017 9/8/2017 9/18/2017 10/612017 4:21: 54PM Page 3 Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth COMPASS 5000.14 Build 65 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usk) (usft) (usft) (usft) (-1100-) Survey Tool Name (ft) (ft) (ft) 13,324.63 98.09 346,19 6,232.13 6,164.13 3,002.53 -10,121.59 6,019,599.92 496,170.89 6.35 8,806.30 MWD (5) 13,327.00 97.99 347.97 6,231.80 6,163.80 3,004.83 -10,122.37 6,019,602.22 496,170.40 10.11 8,808.37 MWD -INC _ONLY (6) 13,360.77 91.14 351.90 6,229.12 6,161.12 3,037.95 -10,128.25 6,019,636.33 496,164.50 23.36 8,837.51 MWD -INC ONLY(6) 13,390.70 90.83 354.30 6,228.60 6,160.60 3,067.65 -10,131.84 6,019,665.03 496,160.88 8.08 8,862.58 MWD -INC ONLY(6) 13,420.52 92.43 350.05 6,227.75 6,159.75 3,097.18 -10,135.90 6,019,694.64 496,156.80 15.22 8,887.81 MWD(7) 13,445.96 93.60 34152 6,226.41 6,158.41 3,121.78 -10,142.13 6,019,719.14 496,150.55 33.80 8,910.66 MWD (7) 13,475.17 93.41 339.83 6,224.63 6,156.63 3,149.29 -10,151.78 6,019,746.64 496,140.88 5.81 8,937.94 MM (7) 13,505.23 92.79 338.69 6,223.00 6,155.00 3,177.36 -10.162.41 6,019,774.70 496,130.23 4.31 8,966.27 MWD (7) 13,534.95 89.63 333.83 6.222.37 6,154.37 3,204.55 -10,174.37 6,019,801.87 496,118.25 19.50 8.994,78 MWD (7) 13,559.01 89.75 331.75 6,222.50 6.154.50 3,225.95 -10,185.37 6,019,823.26 496,107.23 8.66 9,018.25 MWD (7) 13,589.70 91.05 333.51 6,222.29 6,154.29 3,253.20 -10,199.47 6,019,850.50 496,093.10 7.13 9,048.19 MWD (7) 13,616.33 91.84 330.34 6,221.62 6,153.62 3,276.68 -10,212.00 6,019,873.97 496,080.56 12.26 9,074.23 MWD (7) 13,645.89 93.69 337.38 6,220.19 6,152.19 3,303.17 -10,225.00 6,019,900.44 496,067.53 24.60 9,102.88 MWD(7) 13,685.28 92.76 334.08 6,217.97 6,149.97 3,339.02 -10,241.16 6.019.936.27 496051.34 8.69 9,140.73 MM (7) 13,705.82 92.82 333.72 6,216.97 6,148.97 3,357.44 -10,250.19 6,019,954.68 496,042.30 1.77 9,160.64 MWD 17) 13,737.16 9166 32765 621575 6,14735 _ 3,384.73 -10,265.52 6,019.981.96 496,02695 1970. 9191 40 MWD(7) 10/612017 4:21: 54PM Page 3 Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth COMPASS 5000.14 Build 65 Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 310-27 Project: Kuparuk River Unit TVD Reference: 310-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 310-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 310-27 Survey Calculation Method: Minimum Curvature Design: 310-27 Database: EDT Alaska Sandbox Survey SA*n 101612017 4:2154PM Page 4 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Eating DLS Section Survey Tool Name Annotation (usft) (1) (1 (usft) (usft) (usft) (usft) (ft) (ft) ("n00-) Iftl 13,766.66 91,84 328.90 6,214.85 6,146.85 3,409.81 -10,281.02 6,020,007.03 496,011.43 4.28 9,220.58 MWD(7) 13,796.53 94.49 331.58 6,213.20 6,145.20 3,435.70 -10,295.82 6,020,032.90 495,996.61 12.61 9,249.93 MM (7) 13,828.38 91.69 332.24 6,211.48 6.143.48 3,463.75 -10,310.80 6,020.060.94 495,981.61 9.03 9,281.04 MWD(7) 13,852.76 92.61 336.13 6,210.56 6,142.56 3,485.68 -10,321.40 6.020,082.85 495,970.99 16.38 9.304.66 MWD (7) 13,884.52 93.53 338.24 6,208.86 6,140.86 3,514.91 -10,333.70 6,020,112.07 495,958.67 7.24 9,33495 MWD (7) 13,914.29 92.21 340.26 6,207.37 6,139.37 3,542.71 -10,344.23 6,020,139.86 495,948.11 8.10 9.W3.02 MWD (7) 13,944.21 89.75 341.74 6,206.86 6,138.86 3,571.00 -10,353.97 6,020,168.13 495,938.35 9.59 9.390.95 MWD (7) 13,975.83 91.26 339.58 6,206.58 6,138.58 3,600.83 -10,364.44 6.020,197.95 495,927.86 8.33 9,420.53 MWD (7) 14,004.11 90.92 333.86 6,206.04 6,138.04 3,626.79 -10,375.61 6,020.223.90 495,916.66 20.26 9,447.60 MWD(7) 14,027.12 89.88 330.07 6,205.88 6,137.88 3,647.10 -10,386.42 6,020,244.20 495,905.84 1708 9,470.10 MWD (7) 14,060.03 91.69 330.25 6,205.43 6,137.43 3,675,64 -10,402.80 6,020,272.72 495,889.44 5.53 9,502.49 MM (7) 14,090.10 95.44 329.45 6,203.56 6,135.56 3,701.59 -10,417.87 6,020,298.65 495,874.35 12.75 9,532.06 MWD (7) 14,122.09 98.65 327.37 6,199.64 6,131.64 3,728.63 -10,434.49 6,020.325.68 495,857.70 11.93 9,563.46 MWD (7) 14,153,27 99.50 329.31 6,194.72 6,126.72 3,754.83 -10,450.66 6,020,351.87 495,841.52 6.72 9,593.92 MWD (7) 14,184.43 99.33 325.60 6,189.62 6,121.62 3,780.74 -10,467,19 6,020,377.76 495,624.97 11.76 9,624.39 MWD (7) 14,209.01 97.73 320.86 6,185.97 6,11797 3,800.20 -10,481.74 6,020,397.21 495,810.40 20.15 9,648.66 MWD (7) , 14,240.00 94.02 319.33 6,182.80 6,114.80 3,823.85 -10,501.51 6.020,420.83 495,790.61 12.94 9,679.48 MWD(7) 14,271.29 92.39 316.08 6,181.05 6,113.05 3,896.95 -10,522.53 6,020,443.91 495,769.57 1160 9,710.69 MWD(7) 14,300.69 9209 313.03 6,179.90 6,111.90 3,867.56 -10,543.46 6,020,469.50 495,748.63 10.42 9,739.93 MWD(7) 14,330,31 91.35 310.32 6,179.01 6,111.01 3,887.24 -10,565.57 6,020,484.17 495,726.50 9.46 9.769.22 MWD (7) 14,360.48 91.81 307.51 6,178.18 6,110.18 3,906.19 -10,589.04 6,020,503.09 495,703.02 9.43 9,798.81 MWD (7) 14,390.46 91.57 304.72 6.177.30 6,109.30 3,923.85 -10,613.24 6,020.520.73 495,678.81 9.34 9,827.90 MWD(7) 14,421.04 92.82 302.85 6,176.13 6,108.13 3,940.84 -10,638.64 6,020,537.69 495.653.40 7.35 9,857.24 MWD (7) 14,451.92 92.49 300.17 6,174.70 6,106.70 3,956.96 -10,664.94 6.020,553.79 495,62709 8.74 9.886.49 MM (7) 14,480.64 92.09 297.97 6,173.55 6,105.55 3,970.90 -10,690.02 6,020,567.71 495,602.00 7.78 9,913.30 MWD (7) 14,506.54 92.24 296.31 6,172.57 6,104.57 3,982.71 -10,713.05 6,020,579.50 495.578.96 6.43 9,937.14 MWD (7) 14,539.46 92.64 299.44 6,171.17 6,103.17 3,998.08 -10,742.12 6,020,594.85 495,549.68 9.58 9,967.61 MWD (7) 14,570.41 93.35 302.35 6,169.55 6,101.55 4,013.95 -10,768.64 6,020,610.69 495,523.35 9.67 9,996.81 MWS1(7) 16,600,38 93.41 305.53 6,167.78 6,099.78 4,030.65 -10,793.45 6,020,627.37 495,498.52 10.59 10.025.56 MWD (7) 14,630.56 94.42 310.20 6,16572 6,09772 4,099.13 -10,817.22 6.020.645.82 495,474.75 15.80 10,054.98 MWD (7) 14660.49 95.51 312.87 6,163.13 6,095.13 4,068.90 -10,83954 6,020,665.57 495,45241 960 10,004.47 MWD (7) SA*n 101612017 4:2154PM Page 4 COMPASS 5000.14 Build 85 Survey Well 3M-27 3M-27 @ 68.00usft (3M-27) 310-27 @ 68.00usft (31,11-27) True Minimum Curvature EDT Alaska Sandbox ConocoPhillips ConocoPhillipS Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Project: Kupamk River Unit TVD Reference: Site: Kuparuk 3M Pad MD Reference: Well: 3M-27 North Reference: Wellbore: 310-27 Survey Calculation Method: Design: 310-27 Database: Survey Well 3M-27 3M-27 @ 68.00usft (3M-27) 310-27 @ 68.00usft (31,11-27) True Minimum Curvature EDT Alaska Sandbox 101612017 4: 21: 54PM Page 5 BAd(ER UGMES COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS *NIS -El-W Northing East)ng DLS Se (usft) (1 (1) lush) (usft) (usft) (usft) (0)100') Survey Tool Name Annotation (H) (R) ((190ft) 14,691.42 94.73 316.37 6,160.37 6,092.37 4,090.53 -10,861.46 6,020,687.19 495,430.47 11.55 10,115.14 MWD (7) 14,721.05 93.04 319.04 6,158.36 6,090.36 4,112.40 -10,881.35 6.020,709.03 495,410.57 10.65 10,144.67 MWO(7) 14,752.83 90.68 324.60 6,157.33 6,089.33 4,137.35 -10,900.97 6,020,733.97 496,390.92 19.00 10.176.41 MWD (7) 14]81.00 90.34 324.37 6,157.08 6,089.08 4,160.28 -10,917.34 6,020,756.88 495,374.54 1.46 10,204.49 MWD 17) 14,810.73 89.20 327.12 6.157.20 6,089.20 4,184.85 -10,934.07 6,020,781.43 495.357,79 10.01 10,234.07 MWD (7) 14.840.66 88.96 330.39 6,157.68 6,089.68 4,210.43 -10,949.59 6,020,807.00 495,342.25 10.95 10,263.64 MWD (7) 14,872.05 87.88 328.71 6,158.54 6,090.54 4,237.48 -10,965.49 6,020,834.03 495,326.33 6.36 10,294.58 MWD (7) 14,901.17 88.62 327.26 6,159.43 6,091.43 4,262.16 -10,980.92 6,020,856.70 495,310.88 5.59 10,323.41 MWD (7) 14,927.90 88.03 325.09 6,160.21 6,092.21 4,284.36 -10,995.79 6,020,880.88 495,295.99 8.41 10,349.97 MWD (7) 14,955.45 87.97 322.73 6.161.18 6,093.18 4,306.60 -11,012.01 6,020,903.11 495,279.76 8.56 10,377.43 MIND (7) 14,980.69 87.79 321.81 6,162.11 6,094.11 4,326.55 -11,027.45 6,020,923.04 495264.31 3.71 10,402.64 MIND (7) 15,010.74 87.63 319.37 6,163.31 6,095.31 4,349.75 -11,046.51 6,020,946.22 495,245.23 8.13 10,432.66 MWD (7) 15.040.39 87.33 316.37 6.164.61 6,096.61 4,371.71 -11,066.37 6,020,968.17 495,225.34 10.16 10,462.26 MWD (7) 15,071.17 88.03 314.34 6,165.86 6,097.86 4,393.59 -11,087.99 6,020,990.03 495,203.72 6.97 10,492.91 MWD(7) 15,100.67 88.00 311.14 6.166.88 6.098.88 4,413.60 -11.109.64 6,021,010.01 495,182.05 10.84 10,522.15 MWD (7) 15,130.45 91.14 311.15 6,167.11 6,099.11 4,433.19 -11,132.06 6,021,029.58 495,159.61 10.54 10,551.57 MWD (7) 15,160.47 89.63 310.50 6,166.90 6,098.90 4,452.82 -11,154.77 6,021,049.19 495,136.88 5.48 10,581.21 MWD (7) 15,189.41 88.74 310.02 6,167.32 6,099.32 4,471.52 -11,176.85 6,021,067.87 495,114.79 3.49 10,609.72 MWD (7) 15,220.23 85.36 307.91 6,168.90 6,100.90 4,490.87 -11,200.78 6,021,087.20 495,090.85 12.92 10639.93 MWD (7) 15,250.23 82.21 307.60 6,172.15 6,104.15 4,509.13 -11,224.36 6,021,105.43 495,067.26 10.55 10,669.07 MIND (7) 15,281.23 80.38 306.27 6,176.84 6,108.84 4,527.54 -11,248.85 6,021,123.82 495,042.75 7.27 10,698.92 MWD (7) 15,305.34 80.08 304.92 6,180.93 6,112.93 4,541.37 -11,268.17 6,021,137.64 495,023.42 5.66 10,721.93 MWD (7) 15,340.17 80.32 302.29 6,186.86 6,118.86 4,560.36 -11,296.75 6,21 ,156.60 499,994.83 7.47 10,754.85 MWD (7) 15.380.00 80.32 302.29 6.193.56 6,125.56 4,58134 -1132994 6,021,17755 494,961.62 0.00 10,792.26 PROJECTED 10 TD 101612017 4: 21: 54PM Page 5 BAd(ER UGMES COMPASS 5000.14 Build 85 THE STATE ALASKA GOVERNOR BILL WALKER J. Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M-27AL2-01 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-056 Surface Location: 892' FNL, 1574' FEL, Sec. 25, T13N, R8E, UM Bottomhole Location: 960' FNL, 2891' FEL, Sec. 22, T13N, R8E, UM Dear Mr. Ohlinger: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.olaska.gov Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 217-053, API No. 50-029- 22637-01-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. 7-< DATED this 2S day of April, 2017. Sincerely, Daniel T. Seamount, Jr. Commissioner STATE OF ALASKA A� A OIL AND GAS CONSERVATION COMM. PERMIT TO DRILL 20 AAC 25.005 T1Lm%rG1 V V. Lip ,N APR 11 2017 uloZdeqk 1 a. Type of Work: 11 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill ❑ Lateral • ❑� Stratigraphic Test ❑ Development - Oil ❑D • Service - Winj ❑ Single Zone ❑� • Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q - Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180 KRU 3M-27AL2-01 3. Address: 6. Proposed Depth: 12. FieldlPool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 16200' . TVD: 6145' Kuparuk River Pool / ' Kuparuk River Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation (Lease Number): Surface: 892' FNL, 1574' FEL, Sec 25, T1 3N, RBE, UM 3 ADL 355032 aSS a2 Top of Productive Horizon: 8. Land Use P mit: 13. Approximate Spud Date: 2546' FNL, 1585' FEL, Sec 22, T13N, R8E, UM ALK 3576 4/24/2017 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 960' FNL, 2891' FEL, Sec 22, TI 3N, R8E, UM -6+68'— I��a$ 900' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 68' - 15. Distance to Nearest Well Open Surface: x- 506294 y- 6016606 Zone- 4 GL Elevation above MSL (ft): 27' to Same Pool: 5065', 3M-25 16. Deviated wells: Kickoff depth: 14130 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 99 degrees % Downhole: 4305 ' Surface: 3684 - 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hale Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 3375' 12825' 6271' 16200' 6145' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 13016' 6440' N/A 12926' 6372' 12907' Casing Length Size Cement Volume MD TVD Conductor 121' 16" 200 CF 121' 121' Surface 5928' 9-5/8" 1300 sx AS III, 690 sx Class G 5996' 3465' Production 12938' 7" 200 sx Class G 13006' 6432' Perforation Depth MD (ft): 12696' - 12708',12724- - 12744', Perforation Depth TVD (ft): 6198'- 6207', 6219'- 6234', 12764'-12784' 6249'- 6264' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑✓ 20 AAC 25.050 require nts0 21. Verbal Approval: Commission Representative: Date 117h7 ALI-- 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Keith Herring @ 263-4321 be deviated from without prior written approval. Contact Email Keith. E.Herring (okoo.corn Printed Name J. Ohlinger Title Staff CTD Engineer ``'' Signature Phone 265-1102 Date ///I% Commission Use Only Permit to Drill �1 API Number: p -A6317- Dr. Permit Approval 7 See cover letter for other requirements. Number: OSS 50- -� Date: Y-Z�-( Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ,_-/ Other: Samples req'd: Yes ❑ No[✓Z Mud log ri Yes F-1 No FV l30P tt,5 / �>"tssvrc }-7 -17 00 r3 I 1)2S measures: Yes [✓7 No[-] Directional Directional svy req'd: Yes L1p No ❑Y /idvzr�u//ter p>r v�i�%'r flSu � Ing ex ption req'd: Yes ❑ Now Inclination-onlysvy req'd: Yes[] No VT /! ✓a 2_,y Post initial injection MIT req'd: Yes ❑ NOV' ) S f-gfrl�d gilo/J lilt e/'6koffp ,, -if'),c, he 4y) ?v/'il+ aJ.*n� the pa✓��rl la�trral - APPROVED BY / i ' , ^ / Date: `-� �l Approved by: COMMISSIONER THE COMMISSION fKKa 'Submit Form and Form 10-401 (Revised 11/2015) O fJys� r 't s d r 4 months from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate ///4// ' \ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 7, 2017 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: RECEIVE® APR 1 1 2017 :A.GGCC ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill eight laterals out of the KRU 3M-27 (PTD# 195-214) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin in May 2017. The objective will be to drill the 8 laterals KRU 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M-27AL4, 3M-27AL4-01, and 3M-27AL4-02 targeting the Kuparuk A and C -sands. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: — Permit to Drill Application Forms (10401) for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 — Detailed Summary of Operations — Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 — Current wellbore schematic — Proposed CTD schematic The application for sundry approval (10-403) for 3M-27 was approved on 3/16/2017. If you have any questions or require additional information, please contact me at 907-263-4321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 0 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)). ...... ... ..._.... _........ ....................._...........-.... ............. ............................. 2 2. Location Summary ..........................................................................................................................2 (Requirements of 20 AAC 25.005(c)(2))......................--.......................................................................................................................2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005 (c)(3)) ... .............. ....................................................................................._......._......_......_................2 4. Drilling Hazards Information and Reservoir Pressure..................................................................2 (Requirements of 20AAC 25.005 (c)(4))... ... __..................................... _.........._..____....._........................................................_....,...2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c) (5))........ _.............. _....... _....... _.............................. _......-. _. _....._.................. ...................... .......... 2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6)) ..... ......... ._._................................... ............. _........... ........................................... ..................... 3 7. Diverter System Information.......................................................................................................... 3 (Requirements of 20 AA C 25.005(c)(7))........... ..................................... .... --- -............... ........ .................... .............. ....................... ...3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8))............ ........ --- ......... ........... .._...... .............. .......__........................... -..... ........................... 3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9)) ..... ........... ................ ....... ................................ ---- .... ..... ........ ........ ........ .............................. .4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))... _. _............._........................................................_........................................... _... _........ _...4 11. Seabed Condition Analysis............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11)).................._................................ --- ...... .............. ._................................. . _..........................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25,005(c)(12)) ........................................... _........ _.... _......._................................................... .....................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AA C 25.005(c)(13)).........-.-._................._......................................_........._........_............................................._4 Summaryof Operations ............. ................. .................... .......................................... ................................. ........ ............. A LinerRunning...............................................................--............................-.....-.-.......................................................7 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 7 (Requirements of 20 AAC 25.005(c)(14))............_................................................................................... _............................................. 7 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))_ ... ...... .._....... ............................ ................. ..... ................................. ....................... ..................... 7 16. Attachments....................................................................................................................................8 Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & A14-02 ...........__ .......................8 Attachment 2: Current Well Schematic for 3M-27...........................................................................................................8 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02........................8 Page 1 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AI -4-01, AI -4-02 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M- 27AL3, 3M-27AL4, 3M-27AL4-01, & 3M-27AL4-02. All laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A and C sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M- 27AL4, 3M-27AL4-01, & 3M-27AL4-02. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. - Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,200 psi. Using the maximum formation pressure in the area of 4,305 psi in 3M-12 (i.e. 13.4 ppg EMW), the maximum potential surface pressure in 3M-27, assuming a gas gradient of 0.1 psi/ft, would be 3,684 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. - The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3M-27 was measured to be 3,591 psi (11.1 ppg EMW) on 9/5/2016. The maximum downhole pressure in the 3M-27 vicinity is to the southeast in the 3M-12 injector at 4,305 psi (13.4 ppg EMW) from August of 2016. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) None of the offset injection wells to 3M-27 have injected gas, so there is a low probability of encountering free gas while drilling the 3M-27 laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 3M-27 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 3M-27 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 3M -27A 13150' 15200' 6187' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 121' 1640 630 Surface aluminum billet on to 3M-27AL1 13100' 15200' 6190' 6105' 2-3/8", 4.7#, L-80, ST -L slotted liner; 3465' 5750 3090 Production 7" aluminum billet on to 3M-27AL2 14130' 16200' 6127' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; 7240 5410 Tubing 3-1/2" 9.3 aluminum billet on to EUE 0' 12598' 0' 6125' 2-3/8", 4.7#, L-80, ST -L slotted liner; 3M-27AL2-01 12825' 16200' 6203' 6077' aluminum billet on to 3M-27AL3 12775' 14375' 6186' 6163' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4 12825' 15200' 6203' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-01 12875' 16200' 6204' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-02 12583' 14375' 6046' 6167' 2-3/8", 4.7#, L-80, ST -L slotted liner; up into 3-1/2" tubing Existing Casing(Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded 0' 121' 0' 121' 1640 630 Surface 9-5/8" 40.0 L-80 BTC 0' 5996' 0' 3465' 5750 3090 Production 7" 26.0 L-80 BTC -MOD 0' 13006' 0' 6432' 7240 5410 Tubing 3-1/2" 9.3 L-80 EUE 0' 12598' 0' 6125' 10160 10540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AA C 25.005(c) (8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based FloVis mud (8.6 ppg) — Drilling operations: Chloride -based FloVis mud (8.6 ppg). This mud weight will not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and wellbore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled Page 3 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 3M-27 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 3M-27 Window (12725' MD, 6220' TVD) Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 Pumps On 1.5 bpm) Pumps Off A/C -sand Formation Pressure 11.1 3591 psi 3591 psi Mud Hydrostatic 8.6 2782 psi 2782 psi Annular friction i.e. ECD, 0.08psi/ft) 1018 psi 0 psi Mud + ECD Combined no chokepressure) 3800 psi overbalanced -209psi) 2782 psi underbalanced -809psi) Target SHP at Window 11.8 3817 psi 3817 psi Choke Pressure Required to Maintain Target BHP 17 psi 1035 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 The 3M -27A sidetrack will exit the cement pilot hole at 12725' MD and TD at 15200' NO, targeting the Al sand to the north. It will be completed with 2-3/8" slotted liner from TD up to 13150'MD with an aluminum billet for kicking off the 3M-27AL1 lateral. The 3M-27AL 1 lateral will drill to the north to a TD of 15200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 13100' MD with an aluminum billet for kicking off the 3M-27AL2 lateral. The 3M-27AL2 lateral will drill to the west to a TD of 16200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 14130' MD with an aluminum billet for kicking off the 3M-27AL2-01 lateral. The 3M-27AL2-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL3 lateral. The 3M-27AL3 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12775' MD with an aluminum billet for kicking off the 3M-27AL4 lateral. The 3M-27AL4 lateral will drill to the north to a TD of 15200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL4-01 lateral. The 3M-27AL4-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12875' MD with an aluminum billet for kicking off the 3M-27AL4-02 lateral. The 3M-27AL4-02 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12583' NO. Pre -CTD Work 1. RU Slickline: Obtain SBHP, dummy off gas lift mandrels, and pressure test. 2. RU E -line: Punch 2' of holes in the 3-1/2" tubing tail at 12583' MD. 3. RU Pumping Unit: Perform injectivity test down the tubing. 4. RU Service Coil: Mill out "D" nipple and cement squeeze the A/C -sand perforations up to the holes in the tubing tail. 5. RU Slickline: Tag top of cement and pressure test cement. 6. Prep site for Nabors CDR3-AC rig and set BPV. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 3M -27A Sidetrack (Al sand - north) a. Mill 2.80" high -side pilot hole through the cement to 12755' MD. b. Caliper pilot hole. C. Set top of whipstock at 12725' MD. d. Mill 2.80" window at 12725' MD. e. Drill 3" bi-center lateral to TD of 15200' MD. f. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13150' MD. Page 5 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, ALZ-01, AL3, AL4, AL4-01, AL4-02 3. 3M-27AL1 Lateral (C4 sand - north) a. Kickoff of the aluminum billet at 13150' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13100' MD. 4. 3M-27AL2 Lateral (C4 sand - west) a. Kickoff of the aluminum billet at 13100' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 14130' MD. 5. 3M-27AL2-01 Lateral (Al sand -west) a. Kickoff of the aluminum billet at 14130' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 6. 3M-27AL3 Lateral (Al sand - south) a. Kick off of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12775' MD. 7. 3M-27AL4 Lateral (A1 sand -north) a. Kick off of the aluminum billet at 12775' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 8. 3M-27AL4-01 Lateral (Al sand -west) a. Kickoff of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12875' MD. 3M-27AL4-02 Lateral (Al sand - south) a. Kick off of the aluminum billet at 12875' MD. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 12583' MD. 10. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Pull BPV. 2. Obtain SBHP. 3. Install gas lift design. 4. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. Page 6 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, ALZ-01, AL3, AL4, AI -4-01, AI -4-02 - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running - The 3M-27 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(6)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 3M -27A 2900' 3M-27AL1 2900' 3M-27AL2 900' 31M-27AL2-01 900' 3M-27AL3 3700' 3M-27AL4 2900' 3M-27AL4-01 900' 3M-27AL4-02 3700' Distance to Nearest Well within Pool Lateral Name Distance Well 3M -27A 2270' 3M-25 3M-27AL1 2270' 3M-25 Page 7 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 3M-27AL2 5065' 3M-25 3M-27AL2-01 5065' 3M-25 3M-27AL3 1508' 3M-23 3M-27AL4 2270' 3M-25 3M-27AL4-01 5065' 3M-25 3M-27AL4-02 1508' 3M-23 16. Attachments Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Attachment 2: Current Well Schematic for 3M-27 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Page 8 of 8 April 7, 2016 ConocoPhillips 9100 8450 ]800 7150 6500 5850 5200 4550 3900 C 3250 2600 O b 1950 v 1300 650 0 'O -650 m 1300 -1950 2600 1250 900 A550 5200 5850 -6500 Project: KuParuver k River Unit Site: Kuparuk 3M Pad raWMkNMF: t).ST wr°es°rl.m WELLBORE DETAILS: 3M -27A RnRENOE INFORMTION Parent Wellbore: 3M-27 Oomemla lNq RelNarv: MI 3MB), Trve NOM W011: 3M-27 mr•pv: s)su.e.ni Me on MD: 12692.45 Vertnl (VO) enamour 3N.2i@ aa.WIu11(3M47) WBlibore: 3M -27A o' k: m.m aero S.. NO) Neleeree: aid -ANN, D.mE) Plan: SM -27A wP61 (3M•27/3M37A) Mm lOea'oar4mia Meer,. a U,% On.. awn @ semun113W t) calcNatim wlNea MIrMm Curvalme -71501 S y} ".. 31047I068.6YN`OAM-5) 3 6 5 0-13 0 00-123 5 0-1170 0-1105 0.10400-9750 -9100 -8450 -7800 -]150 -6500 -5850 -�00 -4 5�-85t(+5(650 usft/in) 0 -650 0 650 1300 1950 2600 3250 3900 1550 5200 5850 6500 7150 7800 ri.N HUGHES � 1 M ALl —I� ]M 10M OM -2 YM12J I � � sl. Y 1M hM tJ ll "121 M iM9 5c • Y.1.f 1A1 KALI lM-IJ/IM IJAI° i rol \ _ iM I !1 I �-- 3M.nhM21 110 g _ I1'iAil5A d ur Von I tel 1L1M:1` � 3'.� �1M131�IM _- 21 hI IJi1A1.l1 r e _ r ' 19 iA1 II 'M II ,c 8 / / N All UI e0 .:. f!.Lp`11M 13]A �1�91 M 0NI'm 0110 I I AI eM. F all 2�4I MRUiM Y'ILI DI" 3!4-LRd 2i � N W11.11111 n �fi iM+l M 1/.11. II IA3 L /a/x_'. AI I N:1 __ M3ft'ilt 6 Do IA:•9!1 �°Lr I / P': ._ r, v .J. -71501 S y} ".. 31047I068.6YN`OAM-5) 3 6 5 0-13 0 00-123 5 0-1170 0-1105 0.10400-9750 -9100 -8450 -7800 -]150 -6500 -5850 -�00 -4 5�-85t(+5(650 usft/in) 0 -650 0 650 1300 1950 2600 3250 3900 1550 5200 5850 6500 7150 7800 ri.N HUGHES KUP PROD 3M-27 ConocoPhiilips Well Attributes Max Angle & MD TD Ald'$IIa, Inc. Wellaa,¢APIIVWI f1elG Name Weil0ore 51alus ntl V) MB(fl%BI Ptl Bon (XKB) 500292263]00 KUPARUK RNER UNR PROD ]2S9 3,958.90 13,006.0 Comrmnt m5(ppm) Oab Mnotallon Entl Osla KB1iN (X) Ng Relso Bab ../.Asper 2524r Pdt SSSVo NIPPLE 220 10/23/2015 L.MWO: &172008 1/19/1998 Va IaN,m4 cWl An Oepb (XKaI Entl Bab ...... Last Tag: SLIM 12,66].0 9/212016 Mnabtlon Last Mod ay Entl pale Rev Reason: H2S 0 TAG ppmvsn 9/612016 .__..._._...._...._..._.__.... ..._.__..._. CONDOCT01I cos OFT; 3s43f suaNN.E: 41B5.ePBA- ..1-11:141ol GAS OFTapetA Gas LIFT: NAI .As LIPT, g3y31 6LEEVEMAWJ sEb. AASYai,48 a Pah; 12,a64e AKOK,, MAMLI NIPMU: 12,91x1 APERF; tyb86.0.13,1DBg� Fah C?.RLD II'M 12.7.,.11.144.0� APBR1:12..,a- 154A- risk 1Ee64.D Nos 1;8110 PR0DYCP0N;36.S13,DW t ( asmg Pings Lasing Onacriplion 00 (in) 10 (nl iop (NKB) bet Bepin (XHB) BN Beptn (iVOf.. WIILen (I... CONGIIGTOR 16 15062 420 121.0 1210 6258 Gape Top Tnrtad H-00 WELDED Coxing OYe,iplian 01) (1,) lO1,n) Top (flNB) Set GapN(RKa) SM-P.r VB)... WYten9... SURFACE 998 0.835 41.0 5,9959 3,485.3 4000 castle Top Tblvtl L-80 BTC .sing Bnvlptlon OD(in) 109n) Topl%KB) 4el Bapb (RKB) SN DepN (NO)... WVLen PRODUCTION 7 6276 365 13,006.0 6,432.3 26.00 Top Tlvaitl L-60 BTGMOD Tub Strings Turing Be¢cliplian Sting Ma... l0 (In) Top ael... h(fl.. Set OepN (TVOf (... Wl(IbIN Gnde Top Conneelion TUBING 3112 2.992 99 125395 6,0822 930 L-86 EUEBNABMOD Completion Details .-111. Top(XKB) Top DVB)(Me) Top Incl(') Ile. has Com pp 9.9 9.9 0.02 HANGER FMG GEN IV TUBING HANGER 3.500 495.1 494.7 8.85 NIPPLE CAMCO DS LANDING NIPPLE 2.875 12,433.1 6,0052 45.12 SLEEVE BAKER CMU SLIDING SLEEVE 2.812 12.482.6 6,00.5 43.55 SEAL ASSY 8040 SEALS LOCATOR w/ 2 -SPACE OUT 2.960 12,484.0 6,0422 43.40 PBR BAKER 8040 PER 4.000 12.498.2 6,051.9 43.05 Packer BAKER FHL PACKER 2,900 12,515.1 6.054.3 42.70 NIPPLE %NIPPLE 2.813 12,532.6 6,0]].2 4259 OVERSHOT BAKER P6SOY OVERSHOTM 6.00SWALLOW 3625 Tubing Llsoiplion Sb,ng Ma... IB (In) Top (RK a' SO - Khbl,.Bal Oeplb (TVG)(_. WI(Ibhh Gm TOPConnecllon TUBING -Original 3112 2.992 1$533.5 12$9]9 6,1254 9.30L-80 JABMEUE Completion Details min) lG rop2hA Too (rv6,089.6 Top IME Bc Com (2 42A9 125495 QOB9.fi 42.49 NIPPLE CAMCO W NIPPLE 2812 1$5525 6,095.5 42A4 PSR BAKER PER w/10'STROKE 3.000 12,570.6 6,105.2 42,36 PACKER BAKER FHL PACKER 3000 12,5879 6,1180 42.26 NIPPLE CAM000 NIPPLE 2750 12.597.2 6.1240 42.20 SOSML BAKER SHEAR OUT SUB 3.015 Oliver In Nor Verne retNewidle, plugs, Maras, pumps, fish, etc.) 1p(eK6) Top (TV.) Top Ind (NKBI P) Poo Com K.n.. C(.n) 12,]2].0 6,221.9 41.20 Fish 1112" OV ch RK DmpFed Downhole 12/26/1997 12/2611997 12,064D 6,325.2 40.94 Fish V GLV on BK Lost downhole 6@/1996 WW1996 12,9110 61360.7 41.07 Pon JUNKM1IWuppnnnMure1y KApacker8312 &211998 Tailpipe AsenISV, Pushed JUNK to boeom on 5/2196 Perforations & Slots rop (Me) BI. (fteg T (ft.)) 1 B (elm 1 IDlle Gala shot Dons (¢ gq Type Co. 12,696.0 12,708.0 81198.8 6,207.6 G4, 3WU27 91812008 6.0 APE 2.5" PJ HMR 2506, 60 tleg PHASE 12,724.0 12,744.0 6,219.7 6,234.7 Cd, 3M47 &121996 4.0 PERF 180 deg. phasing; RI-) 90 deg Fl towside of hole; 211W Ene del 12,764.0 12,784.0 13,249.8 8.264.9 AA, 3W27 7I M1999 4.0 APERF 180 deg phasing; (Hj 90degi4owsideofhole; 2.5' /IGD Mandrel Inserts S, el on Top jlW) VaFre Lalch Port SlaeTRO Run N Top cAso (AM) Mains ..do, GG(in) Sw Type Type (In) hod) R..Bate I Co. 1 3,543.1 2599.4 LAME.? KBMG 1 GAS LIFT GLV BK 0.125 1,338.0 4162008 2 6,910.1 3,001.5 LAMCO KBMG 1 GAS LIFT GLV SK 0.156 1,34]0 4(612008 3 9,7618 6000,1 CAMCO KBMG 1 GAS LIFT GLV BK 0.188 1,3050 6/62000 4 116663 5546] CAMGO KBMG 1 GASLIFT GLV BK 0.188 1,344.0 41512000 5 12,370.1 5,956.9 11.1. KBMG 1 GAS LIFT OV BK 0.250 0.0 j 4/512008 Notes: General A Safety Eno on. I 7-r- 512512005 NOM 3'News path innzied Over SURF CSG exlemal conosion0'J' 11292010 NNE: View SChdh a [C W Nostra Schemaflc9D 3M-27 Proposed CTD Schematic @ 121' MD 9-5/8" 36# L-80 shoe @ 5996' MD C -sand perfs 12,696'- 12,708' MD 12,724'- 12,744'MD IA -sand perfs 12,7641- 12,7841 MD 3-1/2" Camco DS Landing Nipple @ 495' MD (ID = 2.875") 3-1/2" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrel @ 3543', 6918', 9762',11.666'.12,378' Baker CMU Sliding Sleeve @ 12,433'(2.813" ID X -profile) Baker 80-40 PBR @ 12,485' MD (4.00" ID) Baker FHL packer @ 12,498' MD (2.90" ID) X Nipple @ 12,515' MD (2.813" ID) Baker Po -Boy Overshot @ 12,533' MD Camco W Nipple @ 12,550' MD (2.812" ID) Baker PBR @ 12,558' MD (3.00" ID) Baker FHL packer @ 12,571' MD (3.0" ID) 3-1/2" Camco D nipple @ 12,588' MD (ID = 2.75") (Milled out to 2.80" ID for CTD) 3-1/2" tubing tail @ 12,597' MD 71,26# L-80 shoe @ 3M-27AL3 wpO2 (south) 13,006' MD TD 0 14,375' MD Llner Blllet C 12,776 MD 3M-27AL4 wpOD (north) TD @ 15,200' MD Liner Billet @ 12.M' Me 3M-27AL4-01 wpoo (wool) rr To @ 16,200' MD Liner Billet 12,875' MD 31) 1 L4-02 wp00 (south) 437 L i ner T 12,583'MD 3M-27AL2-01 51 (west) TD 1fi,200' MD Liner Billet 12 825' MD ERRg3M-2716 wp02 (weal) TD @ 16,200' MD Liner. Bi Yet 14130'MD 'TD wp01 (rronh) TD 15,200'1M Llner Billet 13,100' MD 3M -27A wp01 (north) TD @ 15,200' MD Liner Billet @ 13,150 MD ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27 3M-27AL2-01 Plan: 3M-27AL2-01_wp01 Standard Planning Report 03 April, 2017 AFag BAKER HUGHES ConocoPhillips ,rIa. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well; 3M-27 Wellbore: 3M-27AL2-01 Design: 3M-27AL2-01_wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method! Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature Project Kupamk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exam solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kuparuk 3M Pad 3M-27 Audit Notes: Site Position: Northing: 6,016,202.17 usft Latitude: 70° 27' 19.780 N From: Map Easting: 506,126.99usft Longitude: 149° 56'59.998 W Position Uncertainty: 0.00 usft Slot Radius: 0.00Oin Grid Convergence: 0.05 ' Well 3M-27 Audit Notes: Well Position +N/ -S 0.00 usft Northing: 6,016,606.24 usft Latitude: 70' 27'23.753 N +N/ -S +E/ -W 0.00 usft Easting: 506,294.30 usft Longitude: 149° 56'55.073 W Position Uncertainty 0.00 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3M-27AL2-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (9 (I rT) BGGM2016 7/1/2017 17.53 81.00 57,543 Design 3M-27AL2-01_wp01 Audit Notes: Version: Phase: PLAN Tie On Depth: 14,130.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction Dogleg (usft) (usft) (usft) (9 Depth 0.00 0.00 0.00 320.00 Plan Sections Measured TVD Below Dogleg Build Tum Depth Inclination Azimuth System +N/ -S +E/ -W Rate Rate Rate TFO (usft) (°) (I (usft) (usft) (usft) (°1100ft) (°1100ft) (°1100ft) (°) Target 14,130.00 98.70 309.60 6,12231 3,633.38 -10,572.24 0.00 0.00 0.00 0.00 14,250.00 90.80 312.46 6,117.37 3,711.83 -10,662.36 7.00 -6.58 2.39 160.00 14,500.00 90.76 329.96 6,113.93 3,905.92 -10,818.35 7.00 -0.01 7.00 90.00 14,800.00 90.71 308.96 6,110.02 4,132.63 -11,012.22 7.00 -0.02 -7.00 270.00 14,950.00 94.28 318.85 6,103.47 4,236.39 -11,120.05 7.00 2.38 6.59 70.00 15,100.00 93.84 329.37 6,092.83 4,357.44 -11,207.64 7.00 -0.29 7.01 92.00 15,225.00 90.54 321.26 6,088.05 4,460.04 -11,278.66 7.00 -264 -6.49 248.00 15,350.00 90.53 312.51 6,086.88 4,551.19 -11,364.01 7.00 0.00 -7.00 270.00 15,650.00 90.49 333.51 6,084.18 4,789.46 -11,543.50 7.00 -0.01 7.00 90.00 15,950.00 90.82 312.51 6,080.70 5,027.73 -11,722.99 7.00 0.11 -7.00 271.00 16,200.00 90.78 330.01 6,077.18 5,221.95 -11,878.81 7.00 -0.02 7.00 90.00 4/3/2017 2:54:43PM Page 2 COMPASS 5000.1 Build 74 f ConocoPhillips ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Coordinate Reference: Well 3M-27 Company: ConomPhillips(Alaska) Inc.-Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad North Reference: True Well: 3M-27 Survey Calculation Method: Minimum Curvature Wellbore: 3M-27AL2-01 Depth Inclination Design: 3M-27AL2-01_wp01 +NIS +E/ -W Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +NIS +E/ -W Section Rate Azimuth Northing Easting (usft) (.) (.) (usft) (usft) (usft) (usft) ('1100ft) (°) (usft) (usft) 14,130.00 98.70 30960 6,127.31 3,633.38 -10,572.24 9,579.04 0.00 0.00 6,020,230.33 495,720.05 TIP/KOP 14,200.00 94.10 311.28 6,119.51 3,678.49 -10,625.17 9,647.62 7.00 160.00 6,020,275.39 495,667.09 14,250.00 90.80 312.46 6,117.37 3,711.83 -10,662.36 9,697.06 7.00 160.19 6,020,308.69 495,629.87 Start 7 dis 14,300.00 90.80 315.96 6,116.68 3,746.69 -10,698.19 9,746.79 7.00 90.00 6,020,343.51 495,594.02 14,400.00 90.79 322.96 6,115.29 3,822.63 -10,763.14 9,846.72 7.00 90.05 6,020,419.39 495,529.01 14,500.00 90.76 329.96 6,113.93 3,905.92 -10,818.35 9,946.01 7.00 90.15 6,020,502.63 495,473.74 3 14,600.00 90.76 322.96 6,112.60 3,989.22 -10,873.55 10,045.30 7.00 -90.00 6,020,585.87 495,418.47 14,700.00 90.74 315.96 6,111.29 4,065.16 -10,938.50 10,145.23 7.00 -90.09 6,020,661.75 495,353.46 14,800.00 90.71 308.96 6,110.02 4,132.63 -11,012.22 10,244.30 7.00 -90.18 6,020,729.15 495,279.69 4 14,900.00 93.10 315.55 6,106.69 4,199.79 -11,086.15 10,343.27 7.00 70.00 6,020,796.24 495,205.71 14,950.00 94.28 318.85 6,103.47 4,236.39 -11,120.05 10,393.09 7.00 70.22 6,020,832.81 495,171.78 6 15,000.00 94.15 322.36 6,099.80 4,274.92 -11,151.70 10,442.95 7.00 92.00 6,020,871.31 495,140.11 15,100.00 93.84 329.37 6,092.83 4,357.44 -11,207.64 10,542.12 7.00 92.26 6,020,953.77 495,084.10 6 15,200.00 91.20 322.88 6,088.43 4,440.32 -11,263.30 10,641.39 7.00 -112.00 6,021,036.60 495,028.38 15,225.00 90.54 321.26 6,088.05 4,460.04 -11,278.66 10,666.37 7.00 -112.29 6,021,056.30 495,013.00 7 15,300.00 90.53 316.01 6,087.35 4,516.30 -11,328.21 10,741.32 7.00 -90.00 6,021,112.52 494,963.41 15,350.00 90.53 312.51 6,086.88 4,551.19 -11,364.01 10,791.06 7.00 -90.05 6,021,147.37 494,927.58 8 15,400.00 90.53 316.01 6,066.42 4,586.08 -11,399.82 10,840.80 7.00 90.00 6,021,182.23 494,891.75 15,500.00 90.52 323.01 6,085.51 4,662.08 -11,464.71 10,940.73 7.00 90.03 6,021,258.17 494,826.81 15,600.00 90.50 330.01 6,084.61 4,745.42 -11,519.85 11,040.02 7.00 90.10 6,021,341.45 494,771.60 15,650.00 90.49 333.51 6,084.18 4,789.46 -11,543.50 11,088.96 7.00 90.16 6,021,385.47 494,747.91 9 15,700.00 90.55 330.01 6,063.72 4,833.50 -11,567.16 11,137.90 7.00 -89.00 6,021,429.48 494,724.22 15,800.00 90.67 323.01 6,082.65 4,916.84 -11,622.30 11,237.19 7.00 -89.03 6,021,512.77 494,669.01 15,900.00 90.77 316.01 6,081.39 4,992.84 -11,687.19 11,337.12 7.00 -89.11 6,021,588.71 494,604.07 15,950.00 90.82 312.51 6,080.70 5,027.73 -11,722.99 11,386.85 7.00 -89.19 6,021,623.56 494,568.24 10 16,000.00 90.82 316.01 6,079.98 5,062.62 -11,758.79 11,436.59 7.00 90.00 6,021,658.41 494,532.42 16,100.00 90.81 323.01 6,078.56 5,138.61 -11,823.67 11,536.51 7.00 90.05 6,021,734.35 494,467.48 16,200.00 90.78 330.01 6,077.18 5,221.95 -11878.81 11,635.80 7.00 90.15 6,021,817.64 494,412.27 Planned TD at 16200.00 4/32017 2:54:43PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips IVAN ConocoPhillips Planning Report RAKER HUGMS Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 310-27 Wellbore: 3M-27AL2-01 Design: 3M-27AL2-01_wp01 Targets Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature Target Name -hit/miss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape (1) (1) (usft) (usft) (usft) (usft) (usft) 3M-27A_Faultl 0.00 0.00 6,158.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 - plan misses target center by 1140968.00usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) 70113' 32.900 N 140'48'3.201 W - Polygon 1,636,174.00 70113' 32.900 N 140'48'&201 W - plan misses target center by 1140569.76usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) Point 6,183.00 0.00 0.00 Point 6,158.00 0.00 0.00 6,020,114.00 1,636,574.00 Point 6,158.00 1.00 1.00 6,020,115.00 1,636,575.00 Latitude Longitude 701 13'50.989 N 140" 47' 43.316 W 3M-27AL2-01_703 0.00 0.00 6,077.00 4,010.971,128,266.27 6,021,570.00 1,634,444.00 70114' 8.277 N 140148' 38.057 W - plan misses target center by 1138838.57usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) 6,018,190.00 - Point 70113' 32.900 N 140'48'3.201 W 3M-27AL3_Fault2 0.00 0.00 6,188.00 629.171,129,993.58 6,018,190.00 1,636,174.00 70113' 32.900 N 140'48'&201 W - plan misses target center by 1140569.76usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) Point 6,183.00 0.00 0.00 - Polygon - Rectangle (sides W1,500.00 H1.00 00.00) Point 6,188.00 0.00 0.00 6,018,190.00 1,636,174.00 Point 6,188.00 1.00 1.00 6,018,191.00 1,636,175.00 3M-27AL3_Fault2_M 0.00 0.00 0.00 629.171,129,993.58 6,018,190.00 1,636,174.00 70113' 32.900 N 140'48'3.201 W - plan misses target center by 1140586.24usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) Point 6,183.00 0.00 0.00 6,018,656.00 - Rectangle (sides W1,500.00 H1.00 00.00) Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 3M-27A_Fault7_M 0.00 0.00 0.00 2,553.021,130,395.25 6,020,114.00 3M-27AL2-01_T01 0.00 0.00 6,112.00 2,817.031,129,240.36 6,020,377.00 1,635,419.00 70113' 55.252 N 140148' 15.297 W - plan misses target center by 1139812.89usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) 1,637,431.00 70113' 57.516 N 140147' 15.219 W - plan misses target center by 1141841.73usft at 14130.00usft MD (6127.31 TVD, 3633.38 - Point - Polygon Point 0.00 0.00 0.00 310-27 CTD Polygon Sot 0.00 0.00 0.00 10.631,129,376.00 6,017,571.00 1,635,557.00 70113' 27.802 N 1401 48'23.598 W - plan misses target center by 1139970.47usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) - Polygon Point 1 0.00 0.00 0.00 6,017,571.00 1,635,557.00 Point 0.00 1,549.65. 635.29 6,019,121.03 1,636,190.92 Point 0.00 1,306.29 1,066.14 6,018,878.06 1,636,621.93 Point 0.00 388.33 899.40 6,017,960.05 1,636,455.98 Point 0.00 -90.36 437.97 6,017,481.02 1,635,995.00 Point 0.00 0.00 0.00 6,017,571.00 1,635,557.00 3M-27AL2-01_T02 0.00 0.00 6,088.00 3,229.371,128,881.67 6,020,789.00 1,635,060.00 70113' 59.783 N 140148' 23.796 W - plan misses target center by 1139453.98usft at 14130.00usft MD (6127.31 TVD, 3633.38 N. -10572.24 E) - Point 3M-27 CTD Polygon We 0.00 0.00 0.00 4,589A0 1,128,180.75 6,022,148.00 1,634,358.00 70114' 14.017 N 14014B' 37.999 W - plan misses target center by 1138769.88usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) - Polygon Point 0.00 0.00 0.00 6,022,148.00 1,634,358.00 Point 0.00 -2,757.14 2,351.05 6,019,393.12 1,636,711.14 Point 0.00 -3,440.92 1,991.47 6,018,709.11 1,636,352.18 Point4 0.00 -2,499.35 1,383.16 6,019,650.07 1,635,743.13 Point 0.00 436.73 -394.39 6,021,710.98 1,633,964.02 Point 0.00 0.00 0.00 6,022,148.00 1,634,358.00 3M-27AL3_Faultl 0.00 0.00 6,183.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70113'37.414N 140148'0.963W - plan misses target center by 1140576.05usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) - Polygon Point 6,183.00 0.00 0.00 6,018,656.00 1,636,181.00 Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 3M-27A_Fault7_M 0.00 0.00 0.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 70113' 50.989 N 140147' 43.316 W - plan misses target center by 1140984.46usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) - Rectangle (sides W1,500.00 H1.00 D0.00) 3M-27 CTD Polygon Not 0.00 0.00 0.00 3,355.381,131,253.01 6,020,917.00 1,637,431.00 70113' 57.516 N 140147' 15.219 W - plan misses target center by 1141841.73usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) - Polygon Point 0.00 0.00 0.00 6,020,917.00 1,637,431.00 Point 0.00 -2,146.46 -952.80 6,018,769.95 1,636,480.11 4/3/2017 2:54:43PM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips .A FA. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27AL2-01 Design: 3M-27AL2-01_wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature Point 0.00 -1,769.89 -1,622.57 6,019,145.92 1,635,810.09 Point 0.00 328.43 -503.79 6,021,244.97 1,636,926.98 Point 0.00 0.00 0.00 6,020,917.00 1,637,431.00 3M-27AL3 Faultl_M 0.00 0.00 0.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70° 13'37.414 N 140° 48'0a63 W - plan misses target center by 1140592.50usft at 14130.00usft MD (6127.31 TVD, 3633.38 N, -10572.24 E) TIP/KOP - Rectangle (sides W1,500.00 H1.00 D0.00) 6,117.37 3,711.83 -10,662.36 Start 7 dls Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 16,200.00 6,077.18 23/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth -N/-S +E/ -W (usft) (usft) (usft) (usft) Comment 14,130.00 6,127.31 3,633.38 -10,572.24 TIP/KOP 14,250.00 6,117.37 3,711.83 -10,662.36 Start 7 dls 14,500.00 6,113.93 3,905.92 -10,818.35 3 14,800.00 6,110.02 4,132.63 -11,012.22 4 14,950.00 6,103.47 4,236.39 -11,120.05 5 15,100.00 6,092.83 4,357.44 -11,207.64 6 15,225.00 6,088.05 4,460.04 -11,278.66 7 15,350.00 6,086.88 4,551.19 -11,364.01 8 15,650.00 6,084.18 4,789.46 -11,543.50 9 15,950.00 6,080.70 5,027.73 -11,722.99 10 16,200.00 6,077.18 5,221.95 -11,878.81 Planned TD at 16200.00 4/3/2017 2: 54:43PM Page 5 COMPASS 5000.1 Build 74 V" Baker Hughes INTEQ ,IR. ConocoPhillips Travelling Cylinder Report B"ER HUGHES Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Reference Site: Kuparuk 3M Pad Site Error: 0.00 usft Reference Well: 3M-27 Well Error: 0.00 usft Reference Wellbore 3M-27AL2-01 Reference Design: 3M-27AL2-01_wp01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3M-27 3M-27 @ 68.00usft (3M-27) 31M-27 @ 68.00usft (3M-27) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference 3M-27AL2-01_wp01 -ilter Type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: 14,130.00 to 16,200.00usft Scan Method: Tres. Cylinder North Results Limited by: Maximum center -center distance of 1,813.20 usft Error Surface: Elliptical Conic Survey Tool Program Date 3/30/2017 From To Casing Hole (usft) (usft) Survey (Wellbore) Tool Name Description 265.00 12,692.45 3M-27 (3M-27) MWD MWD -Standard 12,692.45 13,100.00 3M-27A_wp01 (3M -27A) MWD MWD -Standard 13,100.00 14,130.00 3M-27AL2_wp02(3M-27AL2) MWD MWD- Standard 14,130.00 16,200,003M-27AL2-01wp01(3M-27AL2-01) MWD MWD - Standard Casing Points Kuparuk 3M Pad - 3M-27 - 3M-27AL2 - 3M-27AL2_wp02 Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name Distance Deviation Warning Site Name 13,016 00 6,263.85 9 5/8" 9-528 12-1/4 16,200.00 6,145.18 2 3/8" 2-3/8 3 Summary Kuparuk 3M Pad - 3M-27 - 3M-27AL2 - 3M-27AL2_wp02 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Weii-Wellbore-Design (usft) (usft) (usft) (usft) Kuparuk 3M Pad Mnsured Vertical 3M-27-3M-27AL2-3M-27AL2_wp02 14,149.99 14,150.00 0.46 0.82 0.20 Pass - Minor 1/10 3M-27-3M-27AL4-01-3M-27AL4-01_wp00 14,149.99 14,150.00 0.46 1.35 -0.80 FAIL - Minor 1/10 Offset Design Kuparuk 3M Pad - 3M-27 - 3M-27AL2 - 3M-27AL2_wp02 onset See Ener: 0.60 unit Survey Progmm: 26SMWD, 12692 -MWD, 13100 -MWD Rule Assigned: Minor 1110 Onset Well Enor: 0.00 out RMerence ORest semi Ma)orAxls Mnsured Vertical Measuretl Vertical Reference West TooDace♦ ONem W.111m. cemre casing- Dennis to No Go Alloxable Iwming Depth Depth Death Depth "..in tN/S 10-w Hole Saxe cemre Dishomm Deviation (aze) (earn (ush) (msn) (usft) leen) (1 (welt) (oft) 11 (meal (usft) (van) 14,149.99 6,192.51 14,150.00 6,192.06 0.24 0.19 -4972 3,64602 -10.587.39 2-11116 0.46 0.82 0.20 Pass- Minor Vio, cc, ES, SP 14,17490 6,18968 14.17500 Bde7.55 045 0.44 -47.10 3,662.02 -10,606.07 2-11/18 262 1.17 160 Pass -Minor 1110 14.19872 6,187.53 14.200.00 6.183.34 0.67 0.69 -41.43 3,87851 -10,624.38 2-11/16 424 1.34 3,72 Pau - Minor 1110 14.22445 6,186.11 14,225.00 6,179.51 0.90 094 -36.17 3,69554 -10,64228 2-11116 6,76 1.38 6.00 Pau - Minor 1110 14,249.08 6,165.39 14,25.00 8,17608 1,12 1.19 -31.60 3,71107 -10,659,76 2-11116 971 139 873 Pan -Mhwr 1/10 14,273.96 6,185.04 14.275.00 6,17100 1.36 1.45 -27.00 3,731.09 -10,67881 2-11/16 12.73 139 11.58 Pass -Minor 1/10 14,29896 6,184.69 14.300.00 6,170.33 1.60 171 -23.30 3,749.60 -10,693.41 2-11116 15.36 1.39 14.11 Pass - Miner 1/10 14.324.04 6,181.34 14,325.00 6,167.99 1.84 197 -2003 3,768.56 -10.709.53 2-11116 1768 187 1638 Pass - Minor 1110 14,349.15 6,183.99 14,350.00 6,165.67 2.09 224 -17.08 3,788.02 -10,725.06 2-11116 1998. 140 1669 Pass - Minor 1/10 14,37431 6.103.64 14.375.00 6,163.36 2.34 2.51 -14.38 3,807.93 -10,739.99 2-11116 22.28 140 21,09 Pass - Minor 1110 14.399.50 6,103.29 14,400.00 6,161.06 2.59 178 -11.85 3,828.30 -10,75430 2-11116 24.58 1.36 23.63 Pass - Minor 1110 14,424.74 6,182.95 14,425.00 6,158]9 2.85 3.05 _a% 3.848.95 -10.76821 2-11116 26]5 1.29 26.35 Pass Minor 1/10 14,45.02 6,10260 14,45090 6,156.57 3.10 3.33 -1060 3.069.24 -10.782.65 2-11/16 28.0 1.32 27.75 Pass -Minor 1110 14,475.18 6.182.26 1447500 8.151.45 3.37 3.61 -1173 3,889.08 -10,79770 2-11116 29.28 1.35 28.16 Pans -Minor VlO CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 31302017 4:40:42PM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Project: Kul River Unitua Site: Kuparuk 3111 Patlcoadinam(Nfl rammrom xmn u.e"•d. wm. ¢sa• PvId WELLBORE DETAILS: 3M-27AL2-01 REVERENCE DIrDRxunoN Parent Wellbore: 3M-27AL2 Ralneve Well uevar, nNorm Well: 3M-27 an,'Ma s�is'a . Te on MD: 14130.00 venal RD) ReMrems: wean sea CewN Wellbore: 3M-27AL2-01 Ceive:: 1... Latitude S. rysl Rtlererce: sm-la oox, ocosl Plan: 3M-27AL2-01_wl(3M-27/3M-27AL2-01) Med D.�ec2cwlmi 6016606.24 Mxsmed Dma• Rdemrce: 3M27®UOcna0We7) 70° 27'23.753 N 149° 56'55.073 W Sec MD L9e,40e, M M.. C1irveNie Mean E 6400 6000 5600 5200{ 4800 4400 74000 CD 0 7t3600 =3200 0 2800 24M O 0 Gr) 2000 600 200 800 rill BAKEHtlQ�HES �........■■■........ WELL DETAILS: 3M-27 +N/ -S +E/ -W Northing Easting Latitude Longitude 0.00 0.00 6016606.24 506294.30 70° 27'23.753 N 149° 56'55.073 W Sec MD Inc Azi TVDSS +N/ -S +E/ -W Dleg TPace VSecl Annotation 1 14130.00 98.70 309.60 6127.31 3633.38-10572.24 0.00 0,00 9579.04 TIPIKOP 2 14250.00 90.80 312.46 6117.37 3711.63 -10662.36 7.00 160.00 9697.06 Start 7 dls 314500.00 90.76 329.96 6113.93 3905.92-10818.35 7.00 90.00 9946.01 3 4 14800.00 90.71 308.96 6110.02 4132.63-11012.22 7.00 270.0010244.30 4 514950.00 94.26 318.85 6103.47 4236.39-11120.05 7.00 70.0010393.09 5 6 15100.00 93.84 329.37 6092.83 4357.44-11207.64 7.00 92.0010542.12 6 7 15225.00 90.54 321.26 6088.05 4460.04-11278.66 7.00 248.0010666.37 7 8 15350.00 90.53 312.51 6086.88 4551.19-11364.01 7.00 270.0010791.06 8 915650.00 90.49 333.51 6084.18 4789.46-11543.50 7.00 90.0011088.96 9 1015950.00 90.82 312.51 6080.70 5027.73-11722.99 7.00 271.0011386.85 10 11 16200.00 90.78 330.01 6077.18 5221.95-11678.81 7.00 90.0011635.60 Planned TD at 16200.00 Mean E 6400 6000 5600 5200{ 4800 4400 74000 CD 0 7t3600 =3200 0 2800 24M O 0 Gr) 2000 600 200 800 rill BAKEHtlQ�HES �........■■■........ West( -)/East(+) (400 usfr/in) 5605 HI 5]00 H��EMONOMMEMOM jFR I■■■■■.■■�� wwMEME.■, �� IMEMOMiiifr_ IMEMOMOMENI. I■MMMMMm■��_!� WMENNME_N 95 ■■■■MON ■■■MMEN IM MMMEMEMOMEMMMMMMN 3 -27/3 -27A I ry I----- f ..■ -14000-13600-13200-12800.12400-12000-11600-11200-10600-10400-iMW-9600 -92W -8800 -8400 4000 -7600 -7200 -6800 Vertical Section at 320.000 (95 usft/in) West( -)/East(+) (400 usfr/in) 5605 HI 5]00 6 95 3 -27/3 -27A I ry f 5890 47'3.1-27AIA 5985 3 -l7/3 -27A L2 HI -27 M-27 L3 -' Al -27/ M-27 6080 ,Al'],'3M'7AL -f- 61]5 9 Plan ed TLq at 162 000 62]0 TI OP 5 n]dl 3N-2] .27AL-01 5365 6460 3k-27/3 -27AL 01 3M-2 7 I'l 6555 M-27 3 F ulil ea L 91 70 8265 8360 8455 8550 8645 8]40 8835 8910 9025 9120 9215 9310 9405 9500 9595 9690 9785 9680 9975 10070 10165 10260 10355 10450 10545 10640 10715 1083010925 11020 IIIIS 11210 11305 11400 11495 11590 11685 11790 Vertical Section at 320.000 (95 usft/in) TRANSMITTAL LETTER CHECKLIST WELL NAME: K4_ 3n1- oAL I- O 1 PTD: C 2. ( 7 — O's- Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: 14 L i Ef" POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore sement of existing well Permit LATERAL No. �1 �'caS 3 API No. 50-_g9_ (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50— from from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Comfy Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well until after (Company Name l has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2XB) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 PTD#:2170560 Company CONOCOPHILLIPS ALASKA INC_ Initial Class/Type Well Name: KUPARUK RIV UNIT 3M-27AL2-01_ Program DEV Well bore seg d❑ DEV/PEND GeoArea 890 _. Unit 11160. On/Off Shore On — _ Annular Disposal ❑ Administration 1 Permit fee attached NA 2 Lease number appropriate _ Yes ADL0025523, Surf Loc; ADL0025522, Portion of Well; ADL0355032, Top Prod Intery&. TD. 3 Unique well name and number Yes KRU 3M-27AL2-01 4 Well located in a defined pool Yes KUPARUK RIVER,. KUPARUK RIV OIL - 490100,. governed by Conservation. Order No, 4320... 5 Well located proper distance from drilling unitboundary. Yes CO 432D contains no spacing restrictions with respect to drilling unit boundaries. 6 Well located proper distance from other wells Yes CO 432D has no interwell spacing restrictions. 7 Sufficient acreage available in drilling unit Yes 8 Ifdeviated, is wellbore plat. included Yes 9 Operator only affected party. Yes Wellbore will be more than 500' from an external property line where ownership or landownership changes... 10 Operator has appropriate bond in force Yes 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes 13 Can permit be approved before 15 -day wait. Yes _ PKB 4/13/2017 14 Well located within area and strata authorized by. Injection Order # (put 10# in comments) (For NA 15 All wells within 1/4 mile area of review identified (For service well only) NA. 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA 17 Nonconven, gas conforms to AS31.05.030Ij.1.A),(j.2.A-D) NA 18 Conductor string provided NA Conductor set-in KRU 3M-27 Engineering 19 Surface casing. protects all known USDWs NA Surface casing set in 3M-27 20 CMT vol adequate. to circulate. on conductor & surf csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons. No Productive_ interval will be completed with slotted liner 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage. or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has. a 10403 for abandonment been approved NA 26 Adequate wellbore separation. proposed.... Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling fluid program schematic & equip list. adequate Yes Max fromation pressure is 4305 psig(13.4 ppg EMW); will drill w/ 8.6 ppg EMW and maintain overbal. w/ MPD VTL 4/21/2017 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 3684 psig; will test BOPS to 4200 psig 31 Choke. manifold complies w/API. RP -53 (May 84)....... Yes 32 Work will occur without operation shutdown Yes _ 33 Is presence of H2S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen. sulfide measures No Wells on 3M -Pad are 1-12S -bearing. 1-12S measures required. Geology 36 Data presented on potential overpressure zones Yes Max. potential reservoir pressure is 13.4 ppg EMW; will be drilled using 8.6 ppg mud and MPD technique. Appr Date 37 Seismic analysis of shallow gas. zones. NA PKB 4/13/2017 38 Seabed condition survey (if off -shore) NA 39 Contact. name/phone for weekly progress reports [exploratory only] NA Onshore development spoke to be. drilled. Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissi er Date � IzS t