Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-055DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170550 Well Name/No. KUPARUK RIV UNIT 3M-27AL2 FO Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029-22637-61-00 MD 15443 TVD 6146 Completion Date 9/23/2017 Completion Status 1-0I1- Current Status 1-0I1 UIC No REQUIRED INFORMATION / / Mud Log No V Samples No J Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval CHI Type Med/Frmt Number Name Scale Media No Start StopReceived CH Comments ED C 28657 Digital Data 12580 15443 10/13/2017 Electronic Data Set, Filename: 3M-27AL2 GAMMA RES.Ias ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 21VID Final Log.cgm ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 5MD Final Log.cgm ' ED C- 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 5TVDSS Final ' Log.cgm ED C 28657 Digital Data 10/13/2017 Electronic File: 3H-27AL2 2MD Final.pdf . ED C 28657 Digital Data P 10/13/2017 Electronic File: 3H-27AL2 5MD Final.pdf ED C 28657 Digital Data 10/13/2017 Electronic File: 3H-27AL2 5TVDSS Final.pdf, ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 EOW - NAD27.pdf ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 EOW - NAD27.txt ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 Survey Listing.txt ' ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 Surveys.txt , ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2_Final Surveys TD 15443.csv ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2_Final Surveys TD 15443.xlsx ED C 28657 Digital Data 10/13/2017 Electronic File: 3M- 27AL2_25_tapescan_BHI_CTK.txt ED C 28657 Digital Data 10/13/2017 Electronic File: 3M- 27AL2_5_tapescan_BH I_CTK.txt' ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2_output.tap . ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 2MD Final Log.tif AO(;('(' Pagc 1 M 3 1hwsday, Dcocmbcr 28, 2017 DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170550 Well Name/No. KUPARUK RIV UNIT 3M-27AL2 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-61-00 MD 15443 TVD 6146 Completion Dale 9/23/2017 Completion Status 1-0I1- Current Status 1-0I1- UIC No ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 51VID Final Log.tif ED C 28657 Digital Data 10/13/2017 Electronic File: 3M-27AL2 5TVDSS Final Log.tif Log C 28657 Log Header Scans 0 0 2170550 KUPARUK RIV UNIT 3M-27AL2 LOG HEADERS Log C 28658 Log Header Scans 0 0 2170550 KUPARUK RIV UNIT 3M-27AL2 PBI LOG HEADERS ED C 28658 Digital Data 12580 14280 10/13/2017 Electronic Data Set, Filename: 3M-27AL2PB1 GAMMA RES.las ED C 28658 Digital Data 10/13/2017 Electronic File: 3H-27AL2PB1 2MD Final.cgm - ED C 28658 Digital Data 10/13/2017 Electronic File: 3H-27AL2PB1 51VID Final.cgm - ED C 28658 Digital Data 10/13/2017 Electronic File: 3H-27AL2PB1 5TVDSS Final.cgm ED C 28658 Digital Data _ P 10/13/2017 Electronic File: 3H-27AL2PB1 2MD Final.pdf ED C 28658 Digital Data P 10/13/2017 Electronic File: 3H-27AL2PB1 5MD Final.pdf. ED C 28658 Digital Data P10/13/2017 C Electronic File: 3H-27AL2P61 5TVDSS Final.pdf- ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PB1 EOW - NAD27.pdf - ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PBI EOW - NAD27.txt - ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PB1 Final Surveys TD, 14280.csv ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PB1 Final Surveys TO , 14280.xlsx ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PB1 Survey Listing.txt ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PB1 Surveys.txt - ED C 28658 Digital Data 10/13/2017 Electronic File: 3M- 27AL2PB1_25_tapescan_BHI_CTK.txt . ED C 28658 Digital Data 10/13/2017 Electronic File: 3M- 27AL2PB1_5_tapescan_BHI_CTK.txt ED C 28658 Digital Data 10/13/2017 Electronic File: 3M-27AL2PBI_output.tap , ED C 28658 Digital Data 10/13/2017 Electronic File: 3H-27AL2PB1 2MD Final.tif . ED C 28658 Digital Data 10/13/2017 Electronic File: 3H-27AL2PBI 5MD Final.tif . ED C 28658 Digital Data 10/13/2017 Electronic File: 3H-27AL2PB1 5TVDSS Final.tif . ED C 28682 Digital Data 1011612017 Electronic File: 3M-27AL2 EOW - NAD27.pdf, ED C 28682 Digital Data 10/16/2017 Electronic File: 3M-27AL2 EOW - NAD27.txt AOGCC Page 2 of Thursday, December 28, 2017 DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170550 Well Name/No. KUPARUK RIV UNIT 3M-27AL2 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-61-00 MD 15443 TVD 6146 Completion Date 9/23/2017 Log C 28682 Log Header Scans Log C 28683 Log Header Scans ED C 28683 Digital Data ED C 28683 Digital Data Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report Production Test Informatior7Y NA Geologic Markers/Tops 0 COMPLIANCE HISTORY Completion Date: 9/23/2017 Release Date: 4/25/2017 Description Comments: Compliance Reviewed By: Completion Status 1 -OIL Current Status 1 -OIL UIC No 0 0 2170550 KUPARUK RIV UNIT 3M-27AL2 LOG HEADERS 0 0 2170550 KUPARUK RIV UNIT 3M-27AL2 P131 LOG HEADERS 10/16/2017 Electronic File: 3M-27AL2PB1 EOW - NAD27.pdf- 10/16/2017 Electronic File: 3M-27AL2PB1 EOW - NAD27.txt Sample Interval Set Start Stop Sent Received Number Comments Directional / Inclination Data O Mud Logs, Image Files, Digital Data Y / Core Chips Y A Mechanical Integrity Test Information Y Composite Logs, Image, Data Files 0 Core Photographs Y / Daily Operations Summary E) Cuttings Samples Y NA Laboratory Analyses Y / Date Comments Date: AOGC(Page 3 of 3 Thursday, December 28, 2017 I STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil Q Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions: 1b. Well Class: Development ❑� Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 9/23/2017 14. Permit to Drill Number/ Sundry: 217-055 , 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 8/30/2017 15. API Number: 50-029-22637-61-00. 4a. Location of Well (Governmental Section): Surface: 892' FNL, 1574' FEL, Sec 25, T1 3N, R8E, UM Top of Productive Interval: 3348' FNL, 1118' FEL, Sec 22, T1 3N, RBE, UM Total Depth: 1575' FNL, 2424' FEL, Sec 22, T1 3N, R8E, UM 8. Date TO Reached: 9!7/2017 16. Well Name and Number: KRU 3M-27AL2 /3M-27AL2 PB1 9. Ref Elevations: KB: 68 GL: 27 BF: 17. Field / Pool(s): Kuparuk River Field/Kuparuk Oil Pool 10. Plug Back Depth MD/TVD: 15409'/6147'. 18. Property Designation: ADL 25523, ADL 355032, ADL 25522, 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 506294 y-6016605 Zone- 4 TPI: x- 496188 y- 6019428 Zone- 4 Total Depth: x- 494880 y- 6021202 Zone- 4 11. Total Depth MDrrVD: 1544376146' • 19. DNR Approval Number: 931813000 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: 1795/1725 5. Directional or Inclination Survey: Yes � (attached) No Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: 1 N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: 1315076254' 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary EC R %�' GR/Res RECEIVED OCT 2 0 2017 23. CASING, LINER AND CEMENTING RECORD CASING WT' PER FT. GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENAW(AMOUNT PULLED TOP BOTTOM TOP BOTTOM 16" 62.58 H-40 Surf 121' Surf 121' 24" 200 CF 9.625" 40 L-80 Surf 5996' Surf 3465' 1300 sx AS III Lead, 690 sx Class G 12.25" Tail 7" 26 L-80 Surf 13006' Surf 6432' 8.5" 200 sx Class 2-3/8" 4.7 L-80 13327' 15409' 6232 6147 3" Slotted Liner 24. Open to production or injection? Yes Q No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Dale Perfd): 13327'-15409' MD / 6232'-6147' TVD Slotted Liner CIIZ rte/ L �- 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3-1/2" 12598' 12498 MD/6052 TVD 12571 MD/6105 TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes LJ No Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 9/24/2017 Method of Operation (Flowing, gas lift, etc.): Gas Lift Date of Test: 10/2/2017 Hours Tested: 6.8 Production for Test Period Oil -Bbl: 1070 Gas-MCF:Water-Bbl: 594 521 Choke Size: 1 1 Gas -Oil Ratio: 1 555 Flow Tubing Press. 263 Casing Press: 1315 Calculated 24 -Hour Rate --%V-3778 Oil -Bbl: Gas-MCF:Water-Bbl: 2098 1838 Oil Gravity- API(corr): 20 Form 10-407 Revised 5/2017 !rte /0/0$JJT CO TINU D qN PAGE 2 Submit ORIGINIAL on l� A41t j NN 3011� RB® "S OCT 2 4 2D"1% 28. CORE DATA Conventional Corals): Yes ❑ No ❑✓ Sidewall Cores: Yes ❑ No ❑� If Yes, list formations and intervals cored (MDfrVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No Q If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1795 1725 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 13150 6254 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kupark A TD 15443 6146 (Kuparuk D Sand) 3M-27AL2PB1 TD (Kuparuk A Sand) 14280 6183 Formation at total depth: Kuparuk D / 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematics Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: J. Ohlinger Contact Name: Keith Herring Authorized Title: Staff CID Engineer Contact Email: Keith.E.Herri g@cop.com Authorized Contact Phone: 263-4321 Signature: Date: // /7 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Saft Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feel above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in dem 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3M-27 Final CTD Schematic 6" 62# H40 shoe (off 121' MD 95/8' 369 L-80 shoe @ 5996' MD C -sand parts 12,696'- 12,70T MD 12,724' -12,744' MD FA -sand pads 12,764' -12,784' MD 7" 26# L-80 shoe @ 13,006' MD 3-1/2" Camco DS Landing Nipple @ 495' RKB (ID = 2.875") 3-1/2' 9.3# J55 EUE 8rd Tubing to surface 3-1/2' Camco MMG gas lift mandrel @ 3543'.6918',976Z. 11,666', 12,378' RKB Baker CMU Sliding Sleeve @ 12,433' RKB (2.813" ID X -profile) Baker 804D PBR @ 12,485' RKB (4.00" ID) Baker FHL packer @ 12,498' RKB (2,99'10) X Nipple @ 12,515' RKB (2.813" ID) (12504' PDC) Baker Po -Boy Overshot @ 12,533' RKB (12522' PDC) Camoo W Nipple @ 12,550' RKB (2.812" ID) (12539' PDC) Baker PBR @ 12,558' RKB (3.00" ID) Baker FHL packer@ 12,571' RKB (3.0" ID) (12560' PDC) 3-1/2" Camco D nipple @ 12,588' RKB (1257T PDC) (Milled out to 2.80" ID) 3-1/2'tubing tail @ 12,598' RKB (12587' PDC) slotted liner w/ eeploymenl sleeve =12555' MD, BOL -1442T MD = water soluble tracer pups = all soluble tracer pups 3M-27Al2-01 TD =15350' MD 2-3/5-abae4 Armor w/erichorae eluD biAet TOL =12BiT MD, BOL =1538tl MD Oi Tracer M 15250' MD (SN: T-740) WaterTracer a115273' MD (SN: T-912) 3M.27A TD =1d994' MD 24/8" aloae4l w/ aluminum bill TOL=13232' MD, BOL= 14994' MD OY Tracer an 14844' MO (SN:T-185F) WaterTracer at 1483T MD (SN: T -W) Billet =13415' MD Billet= 1M8a MD sloee4liner w/ aluminum bat 13150' MD, BOL=14852' MO billet - -_ Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log q Star)Tie End Tie Dur (hr) Phase Op cMe Adiviy Coe Tim P -T -X Operation Start DepN (flKB) End DepM(aKa) 8/5/2017 8/5/2017 3.00 MIRU MOVE MOB P Trucks on location, PJSM w/crews, 0.0 0.0 18:00 21:00 follow pre -move check list, pull pit module away from ddling Sub, pull drilling Sub off of well, install jeeps, load shop onto 12' wide trailer. 8/5/2017 8/5/2017 2.25 MIRU MOVE MOB P Start moving to 3M -pad crossing over 0.0 0.0 21:00 23:15 rig mats 8/5/2017 8/6/2017 0.75 MIRU MOVE MOB P On 3M -pad, remove jeeps, prep well 0.0 0.0 23:15 00:00 for rig. 8/6/2017 8/6/2017 4.00 MIRU MOVE MOB P Spot modules over well 27, retrieve 0.0 0.0 00:00 04:00 shop and halfway house. 816/2017 8/6/2017 2.00 MIRU WHDBOP RURD P Follow post move check Isit, setting 0.0 0.0 04:00 06:00 stairs, spotting in dumpsters, hooking up PUTZ 8/6/2017 8/6/2017 2.50 MIRU WHDBOP NUND P Nipple up BOPE's, fuesable istalled, 0.0 0.0 06:00 08:30 called CPF3 Board, COMMS up after 07:00, prep for BOP test, working on MP #2 replacing pulsation dampener 8/6/2017 8/6/2017 1.50 MIRU WHDBOP NUND P PJSM, fluid pack lines, BOP shell test, 0.0 0.0 08:30 10:00 C/O leaking O-ring riser, repeat shell lest to 4200 psi, passed. - Rig Accepted 09:00 hour"• 8/6/2017 8/6/2017 9.00 MIRU WHDBOP BOPE P Begin BOPE test, witness waived by 0.0 0.0 10:00 19:00 Chuck Scheve, lest 10, greased B4 & 8, retested, found bleeder 4leaking since beginning of test (not part of WC, will need replaces), greased R3 was fail/pass. Test IRV iron, leaking near pressure bulkhead, LOTO reel to troubleshoot IR iron 8/6/2017 8/6/2017 1.50 SLOT WELLPR MILL P PT PDL's and tiger tank line, sim-ops, 0.0 0.0 19:00 20:30 remove bulkhead, repair failed o -ring, re -install bulkhead. 8/6/2017 8/6/2017 2.00 SLOT WELLPR MILL P Valve crew on location, load 0.0 0.0 20:30 22:30 equipment, MU extenlions, PT lubricator, pull BPV 8/6/2017 8/6/2017 1.00 SLOT WELLPR MILL P Retest and chart inner reel iron, good 0.0 0.0 22:30 23:30 test 8/6/2017 8/7/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU BHA# 1 0.0 62.4 23:30 00:00 8/7/2017 8/7/2017 0.75 SLOT WELLPR MILL T Finish MU milling BHA# 1, with turned 62.4 62.4 00:00 00:45 down bi-center bit 2.98", surface test tools, stab INJH 8/7/2017 8/7/2017 1.75 SLOT WELLPR MILL T RIH, taking freeze protect returns out 62.4 9,098.0 00:45 02:30 side to tiget tank. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Set down 2k CTSW, PUH circulate 9,098.0 7,940.0 02:30 03:30 milling fluid around, re -boot BHI computers, PUH for Tie In. 8/7/2017 8/7/2017 0.55 SLOT WELLPR MILL T Log formation for tie in/depth control 7,940.0 8,042.0 03:30 04:03 plus 18.0' 8/7/2017 8/7/2017 0.20 SLOT WELLPR MILL T RIH, 8,042.0 9,030.0 04:03 04:15 8/7/2017 6/7/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 2.0' 9,030.0 9,068.0 04:15 04:30 - Page 1/51 ReportPrinted: 912 712 01 7 . - Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stat Ceplh Start Time End Time Dur (hr) Phase Op Code Aavd, Code Tana P -T -X Opere4on (RKB) End balsa, take) 8/7/2017 8/7/2017 3.00 SLOT WELLPR MILL T Dry Tag TOC @ 9117', PUW 33.5 k. 9,068.0 9,117.0 04:30 07:30 Bring pump up 1.5 bpm at 2315 psi FS, BHP 2389, WHP 0, IA 0, OA 338. Multiple stalls trying to get a pattern started. Mined and pumped 50 bbl pill w/ 2.5% Safe Lube. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Safe lube at bit, 9116.95', 1.8 bpm, 9,117.0 9,117.0 07:30 08:30 2926 psi CP, (2650 psi FS, 300 psi motor work), First time able to stay on it w/out stalling, made 1 foot on Autodriller w/ 0.21K WOB, to 9118', increased WOB after 1 ft and stalled. PU 33K 8/7/2017 8/7/2017 2.80 SLOT WELLPR MILL T Unable to get mill started. Confer with 9,117.0 9,119.0 08:30 11:18 Town, tried recommended break-in procedure at low pump rate, 1.2 bpm. Tried holding in motor stall longer (per town), Spud in multiple times at 15 FPM, pumps ontoff. 8/7/2017 8/7/2017 3.50 SLOT WELLPR MILL T Send Pill w/ 0.5 ppb beads, open 9,119.0 9,122.9 11:18 14:48 EDC, circulate down closer to bit, Gose EDC. After multiple stalls, able to stay on it at 1.8 bpm, 2980 CP, 80 to 100 psi motor work, 0.2K WOB, send second 25 bbl bead pill 8/7/2017 8/7/2017 1.70 SLOT WELLPR MILL T Decision from town to POOH for 9,122.9 62.4 14:48 16:30 different MHA 8/7/2017 8/7/2017 1.50 SLOT WELLPR MILL T At surface, OW WFF, hold PJSM, lay 0.0 62.3 16:30 18:00 down HYC 2.98" bi-center bit and Baker motor, PU HYC 2.73" SD408 Non bi-center PDC bit and new motor 8/7/2017 8/7/2017 1.80 SLOT WELLPR MILL T RIH 62.3 9,060.0 18:00 19:48 8/7/2017 8/7/2017 0.30 SLOT WELLPR MILL T Log tie in from 9000'to 9060, continue 9,050.0 9,124.0 19:48 20:06 RIH 8/7/2017 8/7/2017 2.00 SLOT WELLPR MILL T Dry tag at 9124, PU 33K. Establish 9,124.0 9,141.0 20:06 22:06 FS parameters at 1.2 bpm, 1775 psi CP, O WHP, 2356 psi BHP, 164 psi dP. Stall 2X Creeping in at 8 FPH. PU, establish FS parameters at 1.5 bpm, 2306 psi CP, 0 WHP, 2400 psi BHP, 221 psi dP, able to get WOB w/out stall, mill cement 8/7/2017 8/8/2017 1.90 SLOT WELLPR MILL T OBM, 1.78 bpm at 2,938 psi FS, BHP 9,141.0 9,168.0 22:06 00:00 2,485, WHP 0, IA 0, OA 502 8/8/2017 8/812017 2.30 SLOT WELLPR MILL T OBM, 1.79 bpm at 3,025 psi, BHP 9,168.0 9,195.0 00:00 02:18 2,491. WHP 0, IA 0, OA 508, CTSW=5.6 k, DHWOB=1.7-2.0 k, ROP 30 fph 8/8/2017 8/8/2017 0.25 SLOT WELLPR MILL T Annular and bore pressure increased, 9,195.0 8,700.0 02:18 02:33 PUH 34 k, pulled 50 k at 9,155'. continued wiper above cement. 8/8/2017 8/8/2017 3.75 SLOT WELLPR MILL T RBIH, setting down at 9,167', 8,700.0 9,195.0 02:33 06:18 9,162',9,158', 9,144', work back to bottom (16 stalls since midnight), 1.75 bpm at 2,894 psi FS, BHP 2,572, WHP 0, IA 0, OA 527 Page 2151 Report Printed: 9127/2017 Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth sent StartTine End Time own (� Phas2 code Ade Coda tY Time a -T -x Opera4on End Depth (in(e) 8/8/2017 8/8/2017 2.20 SLOT WELLPR MILL T BOBM, 1.83 bpm at 3,200 psi, BHP 9,195.0 9,212.0 06:18 08:30 2,635, WHIP 0, IA 0, OA 531, CTSW=6 k, DHWOB=1.8 k, ROP 22-30 fph. Pump 5x5 sweeps, for hole cleaning. 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T PUH, PUW 51 k, DHWOB -12 k, Pull 9,212.0 62.3 08:30 10:00 free, continue PUH, open EDC, POOH pumping 2.2 bpm at 2,806 psi, chasing sweep to surface. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 62.3 62.3 10:00 10:30 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T LD Milling BHA# 2 62.3 0.0 10:30 11:00 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T WO Weatherford tools to arrive 0.0 0.0 11:00 11:30 location. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU Reaves Underreamer, 0.0 83.7 11:30 12:00 WFT Motor, Dual Acting Jars, 2.73" Stabilizer over dead well 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T Tag up, reset counters. RIH, circulate 83.7 9,050.0 12:00 13:30 minimum rate. 8/8/2017 8/8/2017 0.35 SLOT WELLPR MILL T Log formation correction plus 12.0', 9,050.0 9,091.0 13:30 13:51 PUW 36 k 8/8/2017 8/8/2017 0.40 SLOT WELLPR MILL T PUH to underream, dose EDC 9,091.0 8,000.0 13:51 14:15 8/8/2017 8/8/2017 4.00 SLOT WELLPR MILL T Bring pump up to 1.6 bpm at 3,422 8,000.0 9,141.0 14:15 18:15 psi, BHP 2,225, WHIP 0. IA 0, OA 429, RIH at 20 fpm, CTSW=11 k, DHWOB=O 8/8/2017 8/8/2017 0.90 SLOT WELLPR MILL T Motor work increase, stalled, PUH, 9,141.0 9,075.0 18:15 19:09 difficutly working back down, pump 5x5 sweeps, circulate bottoms up with cement chunks over the shakers, caliper indicates tubing collar at 9140'. 8/8/2017 8/8/2017 0.20 SLOT WELLPR MILL T RBIH to continue under -reaming at 9,075.0 9,141.0 19:09 19:21 9141'. 8/8/2017 8/8/2017 2.10 SLOT WELLPR MILL T Conitinue under -reaming from 9141', 9,141.0 9,212.0 19:21 21:27 stalled at 9149', PUW = 39K, continue reaming to 9190', PUW = 361C, increased motor work observed at 9209', stall, PUW = 42K from 9209', RBIH & again observe increased motor work at 9209', slow and let mill off, again let mill off at 9110', ream to end of pilot -hole at 9212' 8/8/2017 8/8/2017 1.00 SLOT WELLPR MILL T Continue with under -reamer past end 9,212.0 9,216.0 21:27 22:27 of pilot -hole, pumping 1.8 bpm, CWT = 7K, WOB =.3K, FS = 1285 psi, slow reaming at -2'-4' fph, confer with town, decision made to POOH & PU junk mill. 8/8/2017 8/9/2017 1.55 SLOT WELLPR MILL T Open EDC, begin POOH to PU 2.80" 9,216.0 2,000.0 22:27 00:00 junk mill, pumping 2.2 bpm 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Continue POOH, tag up, space out 2,000.0 84.0 00:00 00:30 8/9/2017 8/9/2017 0.90 SLOT WELLPR MILL T PJSM, flow -check well, LD BHA #3 84.0 0.0 00:30 01:24 over dead well, under -reamer came out looking good, gauging at 2.90" Page 3/51 ReportPrinted: 9/2 712 01 7 Operations Summary (with Timelog jepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log awn osplh sten Time End Time our (hr) Phase Op Code Ad ty Code Time P -T -x Operation (9Ke) End oepM (flKe) 8/9/2017 8/9/2017 0.60 SLOT WELLPR MILL T PJSM, PU BHA #4 (0° AKO X-Treme 0.0 80.0 01:24 02:00 motor, Baker G -Force up/down jars, 2.80" five -bladed junk -mill), slide in cart, stab on, check pack -offs, tag up 8/9/2017 8/9/2017 1.70 SLOT WELLPR MILL T RIH with BHA #4 80.0 9,040.0 02:00 03:42 8/9/2017 8/9/2017 0.10 SLOT WELLPR MILL T Tie into formation for a +11.5' 9,040.0 9,078.0 03:42 03:48 correction, close EDC 8/9/2017 8/9/2017 0.70 SLOT WELLPR MILL T Continue RIH, set down twice at 9,078.0 9,216.0 03:48 04:30 9144' (min rate & pumps off), PUW = 40K, bring up pumps to 1.8 bpm, FS = 358 psi, stall at 9142', PUW = 40K, attempt milling at -12 fph and get by, drop rate & continue RIH to 9216', PUH, bring up rate 819/2017 8/9/2017 2.00 SLOT WELLPR MILL T Milling at 9216, rate in = 1.8 bpm, FS 9,216.0 9,270.0 04:30 06:30 = 345 psi, CWT = 10K, BHP = 2677 psi, WOB =.5K, Stall at 9270'. Pump 5 x 5 sweeps. 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole to 9155, PUW = 36K, 9,270.0 9,155.0 06:30 07:00 Caught sample. 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper back in hole. RIH = 8K 9,155.0 9,270.0 07:00 07:30 8/9/2017 8/9/2017 2.00 SLOT WELLPR MILL T BOBM, Rate In/Out = 1.8 bpm, FS = 9,270.0 9,336.0 07:30 09:30 355 psi, CWT = 8K, BHP = 2665 psi, WOB = 0.5-2k, ROP=30-70 fph 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole, PUW 40 k 9,336.0 9,160.0 09:30 10:00 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 9,160.0 9,336.0 10:00 10:30 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T BOBM, 1.82 bpm at 3,600 psi, BHP 9,336.0 9,350.0 10:30 11:00 2,749, WHP 0, IA 0, OA 577, 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper up hole PUW 38 k 9,350.0 9,159.0 11:00 11:15 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 5 k 9,159.0 9,350.0 11:15 11:30 8/9/2017 8/9/2017 3.25 SLOT WELLPR MILL T BOBM, 1.79 bpm at 3,830 psi, BHP 9,350.0 9,357.0 11:30 14:45 2,503, WHP 0, IA 0, OA 595, trouble keeping steady DHWOB, pump 5x5 sweep 8/9/2017 8/9/2017 2.25 SLOT WELLPR MILL T POOH, to check inspect BHA, filling 9,357.0 80.0 14:45 17:00 out trip sheet every 1000' 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T PJSM, Flow check, LD BHA #4 over a 0.0 75.0 17:00 18:24 dead well, PU BHA #5 (G -Force up/down jar, agitator, X-Treme motor, 5 blade junk mill, 2.81"), surface lest agitator, good 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T RIH with BHA #5 75.0 9,040.0 18:24 19:48 8/9/2017 8/9/2017 0.30 SLOT WELLPR MILL T Log formation for +11' correction 9,040.0 9,080.0 19:48 20:06 8/9/2017 8/9/2017 0.20 SLOT WELLPR MILL T Continue RIH 9,080.0 9,357.0 20:06 20:18 8/9/2017 8/9/2017 2.10 SLOT WELLPR MILL T OBM, pumping 1.8 bpm, annular= 9,357.0 9,410.0 20:18 22:24 2770, CWT = 9K, WOB = 1.8K,, pump 5x5 sweep, average ROP over interval = 25 fph Page 4151 Report Printed: 9127120171 Operations Summary (with Timelog L/epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log scan Capin Stan Time End Time Cur (hr) Phase Cis Code Activity Code Time P -TX OpemOon (flKe) End Depth Noce) 8/9/2017 819/2017 0.40 SLOT WELLPR MILL T Wiper -trip up to 9102', PUW = 35K, 9,410.0 9,410.0 22:24 22:48 RIW = 7.51K, no issues RIH past 9141' 8/9/2017 811012017 1.20 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, CWT = 9,410.0 9,463.0 22:48 00:00 7.75K, WOB= 1.8K, BHP = 2780 psi, WOB dropped to OK from 9416'- 9419', encounter green/incompetent cement beginning at 9434' (continued to midnight depth of 9463), no WOB or motor work observed 8/1012017 8/1012017 0.50 SLOT WELLPR MILL T Continue in greenlincompetant 9,463.0 9,600.0 00:00 00:30 cement from 9463to 9600', observe significant cement over shakers 8/1012017 8/1012017 0.20 SLOT WELLPR MILL T Wiper up -hole to TOC, PUW = 36K 9,600.0 9,090.0 00:30 00:42 8/10/2017 8/1012017 0.20 SLOT WELLPR MILL T Wiper in-hole, RIW = 7K 9,090.0 9,600.0 00:42 00:54 8/1012017 8/10/2017 1.00 SLOT WELLPR MILL T Continue in green cement from 9600', 9,600.0 9,814.0 00:54 01:54 continue to observe significant cement with soft tan material intermixed over shakers, Sulfuric acid (H2SO4) lest on samples indicates cement, though non reactive with tan material, performing short WT's to evaluate hole loading, PUW= 36K -44K 8/1012017 8/10/2017 0.60 SLOT WELLPR MILL T 725' wiper trip up to 9090', PUW = 9,814.0 9,814.0 01:54 02:30 37K, RIW = 8.3K, pump 5x5 sweeps 8/10/2017 8/10/2017 1.50 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, BHP = 9,814.0 9,866.0 02:30 04:00 2878 psi, FS = 869 psi, stall at 9817', PUW = 39K, CWT = 10K, WOB =.5K, encounter competent cement again at 9815', pump 5x5 sweep 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T WT up -hole, PUW = 32K 9,866.0 7,836.0 04:00 04:30 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T WT in-hole, tie into formation for = -5' 7,836.0 9,866.0 04:30 05:15 correction, RIW = 8K 8/10/2017 8/1012017 3.00 SLOT WELLPR MILL T BOBM, 1.79 bpm at 4,269 psi, BHP 9,866.0 9,950.0 05:15 08:15 2,880, WHP 0, IA 0, OA 608 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T Wiper up hole, PUW 38 k 9,950.0 9,700.0 08:15 08:30 8/10/2017 8110/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 6.4 k 9,700.0 9,950.0 08:30 08:45 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T BOSM, 1.81 bpm at 4,245 psi, BHP 9,950.0 9,971.0 08:45 09:15 1 1 1 2,940, WHP 0, IA 0, OA 606 8/1012017 8/10/2017 0.25 SLOT WELLPR MILL T Stall motor, unable to move pipe, Pull 9,971.0 9,971.0 09:15 09:30 65 k, pipe moving, short wiper up hole to 9,806'. 8/10/2017 8/10/2017 2.50 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,380 psi, BHP 9,971.0 10,015.0 09:30 12:00 3,050, WHP 0, IAO, OA 608 8/1012017 8/10/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, PUW 34 k, unable 10,015.0 10,015.0 12:00 12:45 to pump, seems motor is locked up, open EDC, pump 5x5 sweep, 8/10/2017 8/10/2017 1.50 SLOT WELLPR MILL T POOH, pump 2.3 bpm w/open EDC 10,015.0 74.8 12:45 14:15 4,230 psi, filling trip sheet every 1000' 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T At surface, check well for Flow, PJSM 74.8 74.8 14:15 14:30 1 Page 5151 Report Printed: 912 712 01 7 Operations Summary (with Timelog L/epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Dept Stan Tsne End Time Du,(hr) Phase Dip Code AUirity Cede Time P -T -X Operation (11m) End Depth (111<8) 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T LD milling BHA# 5, inspect tools. 74.8 0.0 14:30 15:00 found BHI motor to be locked up, agitator checked out good. 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T PU/MU Milling BHA# 6, w/new X- 0.0 74.6 15:00 15:45 Theme motor 8/10/2017 8/10/2017 1.70 SLOT WELLPR MILL T RIH, pumping 0.30 bpm at 1138 psi, 74.6 9,050.0 15:45 17:27 filling trip sheet every 1000'. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Log formation correction of +10 9,050.0 9,082.0 17:27 17:39 8/10/2017 8/10/2017 0.55 SLOT WELLPR MILL T Continue RIH, RIW = 9K 9,082.0 10,015.0 17:39 18:12 8/10/2017 8/10/2017 1.70 SLOT WELLPR MILL T OBM at 10,015', pumping 1.8 bpm, 10,015.0 10,075.0 18:12 19:54 CWT = 10K, WOB =1.5K, annular = 3004 psi, pumping sweeps to coincide with WT. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper trip (200'), PUW = 35K, RIW = 10,075.0 10,075.0 19:54 20:06 6K 8/10/2017 8/10/2017 1.80 SLOT WELLPR MILL T OBM at 10,070', pumping 1.8 bpm, FS 10,075.0 10,126.0 20:06 21:54 =948 psi, CWT =4.5K, WOB =1.1K, annular = 3078 psi, 5X5 sweeps coming around. 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T Stall at 10,126', shut down pumps,. 10,126.0 10,117.0 21:54 22:30 PU, start pulling heavy, RBIH, became momentarily detained, bring up pumps, dp jumps up, shut down pumps, jar down twice, jar up 3 times, no success, attempt to bring up pumps, dp increased rapidly (stall condition at 1700 psi diff), shut down pumps, rate out begins to trickle, bring pumps back up, rate out retums, BHA is free, (note: saw DHWOB up to - 15.8K & 70K CWT) 8/10/2017 8/10/2017 1.00 SLOT WELLPR MILL T WT (up to 9295'), circulate bottoms 10,117.0 10,126.0 22:30 23:30 up, RIW = 6.5K 8/10/2017 8/11/2017 0.50 SLOT WELLPR MILL T OBM at 10,126', pumping 1.8 bpm, FS 10,126.0 10,138.0 23:30 00:00 = 945 psi, dp = 1042 psi, CWT = 4.6K, WOB = 1.5K, annular = 3110 psi 8/11/2017 8/11/2017 1.00 SLOT WELLPR MILL T Continue milling cement at 10,138' 10,138.0 10,165.0 00:00 01:00 pumping 1.8 bpm, CWT = 1.5K, WOB = 2K, annular = 3160 psi, W HP = 0 psi, FS = 945 psi, dp = 1061 psi, IA = 0 psi, OA = 631 psi, pump sweeps 8/11/2017 8/11/2017 0.40 SLOT WELLPR MILL T Sweeps come around, WT (500'), 10,165.0 10,165.0 01:00 01:24 PUW =38K, RIW =7K 8/11/2017 8/11/2017 1.60 SLOT WELLPR MILL T OBM at 10,165, pumping 1.8 bpm, FS 10,165.0 10,215.0 01:24 03:00 =945 ps, CWT =4.4K, WOB =1.3K, annular = 3176 psi, pump sweeps timed for WT 8/11/2017 8/11/2017 0.30 SLOT WELLPR MILL T WT (200'), PUW = 38K, RIW = 4K 10,215.0 10,215.0 03:00 03:18 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T OBM at 10,215' pumping 1.8 bpm, FS 10,215.0 10,270.0 03:18 05:18 =940 psi, CWT=2.5K, WOB =1.9K, annular = 3215 psi, pump sweeps timed for WT 8'11/2017 8/11/2017 0.45 SLOT WELLPR MILL T WT up 200', PUW = 40 k, 10,270.0 10,270.0 05:18 0545 Page 6151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sred Depth Sred Tme End Terse Dr(hr) Phew Op c.da Activity Code T,.P-T-X Operation (WB) End Depth (MB) 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm FS = 4126 10,270.0 10,319.0 05:45 07:45 psi, CTSW=0 k, DHWOB=2.2 k, BHP 2,543, WHIP 0, IA 0, OA 659 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Swap milling fluid, wiper up hole, 10,319.0 9,050.0 07:45 06:15 8/11/2017 8/11/2017 0.35 SLOT WELLPR MILL T Wiper trip back in hole, RIW 11.5 k 9,050.0 10,220.0 08:15 06:36 8/11/2017 8/11/2017 0.25 SLOT WELLPR MILL T Log formation for depth control 10,220.0 10,259.5 08:36 08:51 1 1 correction plus 6.5' 8/11/2017 8/11/2017 0.35 SLOT WELLPR MILL T Continue IH 10,259.5 10,319.0 08:51 09:12 8/11/2017 8/11/2017 1.95 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,535' psi FS, BHP 10,319.0 10,374.0 09:12 11:09 2,705,WHP 0, IA 0. OA 644 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper up hole 500', PUW 36 k 10,374.0 10,374.0 11:09 11:39 8/11/2017 8111/2017 1.40 SLOT WELLPR MILL T BOOM, 1.8 bpm at 3,560 psi, BHP. 10,374.0 10,404.0 11:39 13:03 2,795, WHP 0, IA 0, OA 634 8/11/2017 8/11/2017 0.60 SLOT WELLPR MILL T Encountered green cement, RIH w/no 10,404.0 10,425.0 13:03 13:39 diff, pumping 1.77 bpm at 3,606 psi, set down 10,424' stall motor. 8/11/2017 8/1112017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000'9,450', PUW 38 10,425.0 10,425.0 13:39 14:09 k 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T RIH trying to find bottom, 1.77 bpm at 10,425.0 10,433.0 14:09 14:39 3,581 psi, BHP 2,847, WHIP 0, IA 0, OA 628, stall motor, PUW 43 k. "• 29' of green cement 8.75 ppg max 8/11/2017 8/1112017 2.00 SLOT WELLPR MILL T Bring pump back on line, RBIH, 1.8 10,433.0 10,475.0 14:39 16:39 bpm at 3,747 psi, BHP 2,871, IA 0, OA 623 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper trip up hole 1000'(9,475'), PUW 10,475.0 10,475.0 16:39 17:09 42 k 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 10,475', CWT= 10,475.0 10,525.0 17:09 19:09 6K, WOB = 2K, annular = 2965 psi, stall at 10,523', PUW = 45K, continue milling ahead to allow sweep to exit bit. 8/11/2017 8/11/2017 0.85 SLOT WELLPR MILL T WT (1000'), PUW = 40K, RIW = 7K 10,525.0 10,525.0 19:09 20:00 8/11/2017 8/11/2017 2.30 SLOT WELLPR MILL T BOBM, 1.8 bpm, CWT =7K, WOB = 10,525.0 10,575.0 20:00 22:18 1.71K, annular= 2946 psi, pump sweeps 8/11/2017 8/11/2017 1.30 SLOT WELLPR MILL T WT, (1000'), PUW = 43K, lie -in for- 10,575.0 10,565.0 22:18 23:36 19' correction, RIW = 7K, puts new corrected depth at 10,555', tag bottom 10' deeper at 10,565', plan to check counter 8/11/2017 8/12/2017 0.40 SLOT WELLPR MILL T OBM, CWT =3.7K, WOB =1.9K, FS= 10,565.0 10,572..0 23:36 00:00 814 psi, annular = 3059 psi 8/12/2017 8/12/2017 3.30 SLOT WELLPR MILL T Continue milling from 10,572', 10,572.0 10,625.0 00:00 03:18 pumping 1.8 bpm, CWT = 4.7K, FS = 814 psi, WOB = 2K, annular = 3044 psi, pump sweeps, stall at 10,585', PUW = 45K, BHA wiper up to 10,485', stall at 10,612', PUW = 43K, prepping to build new milling system on dg, current system at -70K LSRV Page 7151 Report Printed: 9127/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stmt Depth Stat Time End Tine Dur(hr) Phase Op Cade Adirity Code Time P -T -X Operation (111(8) EM Depth(KKB) 8/12/2017 8/12/2017 1.00 SLOT WELLPR MILL T WT If 000'), PUW = 43K, RIW = 9K 10,625.0 10,625.0 03:18 04:18 Note: Canrig data is faulty/bogus, troubleshoot issue 8/12/2017 8/12/2017 2.90 SLOT WELLPR MILL T OBM, annular = 3144, CWT =7K, 10,625.0 10,675.0 04:18 07:12 WOB = 1.9K, stalled at 10,639', PUW = 60K 8/12/2017 8/12/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 42 it, Wiper 10,675.0 10,675.0 07:12 07:42 back in hole, RIW 7 k 8/12/2017 8/12/2017 2.60 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,700 psi, BHP 10,675.0 10,725.0 07:42 10:18 3,995, WHIP 0, IA 0, OA 629, 8/12/2017 811212017 0.50 SLOT WELLPR MILL T Wiper up hole, 9,800', PUW 41 k, 10,725.0 10,220.0 10:18 10:48 RBIH, RIW 7 k 8/1212017 8/12/2017 0.50 SLOT WELLPR MILL T Log formation correction of minus 10,220.0 10,268.0 10:48 11:18 61.5', inspect and clean counter 8/12/2017 8/12/2017 0.45 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 10,268.0 10,725.0 11:18 11:45 8/12/2017 8/1212017 2.25 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,499 psi, BHP 10,725.0 10,784.0 11:45 14:00 2,772, WHIP 0, IA 0, OA 596, CTSW=10.2,k, DHWOB=2.2, ROP 21 fph 8/12/2017 8/12/2017 0.75 SLOT WELLPR MILL T Wiper up hole to 9,783', 1 000'PUW 10,784.0 10,784.0 14:00 14:45 43 k 8/12/2017 8/1212017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,500psi, BHP 10,784.0 10,840.0 14:45 16:45 2,921, WHIP 0, IA 0, OA 588, CTSW=7 -10k, DHWOB=2.5k, ROP 30 fph 8/12/2017 8/12/2017 1.20 SLOT WELLPR MILL T Wiper up hole 1000', PUW = 40K, 10,840.0 10,840.0 16:45 17:57 RIW = 8.5K 8/12/2017 8112/2017 1.90 SLOT WELLPR MILL T BOBM pumping 1.78 bpm, CWT = 10,840.0 10,890.0 17:57 19:51 3.21K, WOB = 2.4K, annular = 2871 psi, IA = 0 psi, OA = 586 psi, circ pressure = 3645 psi, stall at 10,858', PUW = 52K, pump 5x5 sweeps 8/12/2017 8/12/2017 1.00 SLOT WELLPR MILL T Wiper up -hole 1000', PUW = 42.51K, 10,890.0 10,890.0 19:51 20:51 lie -in for -3' correction, RIW = 8K 8/12/2017 8112/2017 2.30 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 800 10,890.0 10,946.0 20:51 23:09 psi, CWT = 6K, WOB = 2K, annular = 2841 psi, circ pressure = 3662 psi 8112/2017 8/12/2017 0.70 SLOT WELLPR MILL T WT up -hole 1000', PUW = 42K, RIW = 10,946.0 10,946.0 23:09 23:51 8K 8/12/2017 8/13/2017 0.15 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 778 10,946.0 10,949.0 23:51 00:00 psi, CWT = 3.51K, WOB = 2.3K, annular = 2903 psi 8/13/2017 8/13/2017 1.70 SLOT WELLPR MILL T Continue milling at 10949', pumping 10,949.0 10,990.0 00:00 01:42 1.8 bpm, CWT = 3K, WOB = 2K, annular= 2906 psi, pump sweeps 8/13/2017 8/13/2017 0.70 SLOT WELLPR MILL T Wiper 1000' up -hole, PUW =43K, 10,990.0 10,990.0 01:42 02:24 RIW =8K 8/13/2017 8/13/2017 2.80 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 809 10,990.0 11,040.0 02:24 05:12 psi, CWT = 7K, WOB = 2.4K, annular = 2880 psi, WHIP = 0 psi, IA = 0 pis, OA = 595 psi, circ pressure = 3775 psi, MW In = 8.47 ppg, MW Out = 8.47 ppg, LSRV = 19.9K, stalled at 11,013', pump sweeps, stall at 11,033', PUW = 52K 8/13/2017 8/13/2017 1.00 SLOT WELLPR MILL T WT up -hole 1000', PUW = 47 k 11,040.0 11,040.0 05:12 06:12 Page 8151 Report Printed: 9127/2017 e Operations Summary (with Timelog riepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan ceps SWm Time EMTme Cor(110 Please op Code At ity Code Time P -T -x operation (fiK8) End Cept (aKa) 8/13/2017 8/13/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,500 psi, BHP 11,040.0 11,090.0 06:12 08:12 2,976, WHIR 0, IA 0, OA 611, CTSW=7 k, DHWOB=2.3 k, ROP 28 fph 8/13/2017 8/13/2017 0.80 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 43 k, with 11,090.0 10,090.0 08:12 09:00 5x5 sweep 8/13/2017 8/13/2017 3.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,759 psi, BHP 11,090.0 11,155.0 09:00 12:00 3,054. WHIP 0, IA 0, OA 629, CTSW=6 k, DHWOB=2.6 k, ROP 29 fph 8/13/2017 8/13/2017 2.50 SLOT WELLPR MILL T Pump 5x5 sweep, POOH, (open EDC 11,155.0 78.8 12:00 14:30 @ 9,093') 8/1312017 8/13/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 78.8 78.8 14:30 15:00 8/13/2017 8113/2017 0.75 SLOT WELLPR MILL T LD BHA, remove BHI check valves 78.8 0.0 15:00 15:45 8/13/2017 8/13/2017 2.25 SLOT WELLPR MILL T PU/MU, ri=le, slab INJH, jet stack 0.0 0.0 1545 18:00 and surface lines, grease tree & stack 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Perform BOPE Test (begin test at 0.0 0.0 18:00 19:00 18:00 hrs), witness waived by AOGCC (Brian Bixby), break off noale, slide back cart, put on night-cap. 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Test#1, (fail/pass on low), was 0.0 0.0 19:00 20:00 leaking past Bleeder 4 8/13/2017 8/13/2017 1.40 SLOT WHDBOP BOPE P Continue ROPE test, a bit of difficulty 0.0 0.0 20:00 21:24 getting low on Test #4, pressure up to 1500 psi, bled down, pass 8/13/2017 8/13/2017 0.90 SLOT WHDBOP ROPE T Test#5, grease Bravo 2, fail/pass 0.0 0.0 21:24 22:18 8/13/2017 8/13/2017 0.70 SLOT WHDBOP ROPE P Continue BOPE test 0.0 0.0 22:18 23:00 8/13/2017 8/13/2017 0.80 SLOT WHDBOP BOPE T Test #9, grease & cycle Romeo 3, 0.0 0.0 23:00 23:48 fail/pass 8/13/2017 8/14/2017 0.20. SLOT WHDBOP BOPE P Continue BOPE test 0.0 0.0 23:48 00:00 8/14/2017 8/14/2017 2.00 SLOT WHDBOP BOPE P Continue BOPE test (8hr lest) 0.0 0.0 00:00 02:00 8114/2017 8/14/2017 2.00 SLOT WELLPR MILL T Replace houred out UQC, replace 0.0 0.0 02:00 - 04:00 checks, open & clean out MM & choke lines, transducer lines & TT lines of potential cement fall out, await BOT arrival 8/14/2017 8/14/2017 1.50 SLOT WELLPR MILL T PJSM, PU BHA#7 (2.81"junk mill, 0.0 74.0 04:00 05:30 BOT motor, agitator, up/down jars, 10' pup), slide in cart, stab on, RIH to 738' test agitator (good -test) 8/1412017 8114/2017 2.25 SLOT WELLPR MILL T RIH 74.0 10,305.0 05:30 07:45 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T Log formation, too deep, PBUH, re- 10,305.0 10,170.0 07:45 08:15 start logging 10,170' 8/14/2017 8/14/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 36' 10,170.0 10,259.6- 08:15 08:30 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T RIH 10,259.0 11,171.0 08:30 09:00 8/14/2017 8/14/2017 1.75 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,400 psi, BHP 11,171.0 11,210.0 09:00 10:45 2,734, WHIP 0, IA 0, OA 497 8/14/2017 8/14/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000', PUW 43 k, 11,210.0 11,210.0 10:45 11:30 1 1 1 1 1 RBIH, RIW 10 k, with 5x5 sweep Page 9151 Report Printed: 912712017 Operations Summary (with Timelog Liepths) 3M-27 600) Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slav Depth Stan Time E rare Dur (hr) Phase Op Code AaWy Code Time PJA operation (Wlt) End Depth(m(e) 8/14/2017 8/14/2017 1.30 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,180 psi, BHP 11,210.0 11,260.0 11:30 12:48 3,860, WHP 0, IA 0, OA 494, CTSW=11 k, DHWOB=2.4 it, ROP=45 fph 8/14/2017 8/14/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000', PUW 38 k, wiper 11,260.0 11,260.0 12:48 13:33 back in hole, RIW 9 k with 5x5 sweep 8/14/2017 8/14/2017 1.65 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,040 psi, BHP 11,260.0 11,314.0 13:33 15:12 2,825. WHP 0, IA 0, OA 510, CTSW=9 k, DHWOB=2.9 k, ROP=37 fph 8/14/2017 8114/2017 0.70 SLOT WELLPR MILL T WT up -hole 1000'@ 100 fpm, PUW = 11,314.0 11,314.0 15:12 15:54 41 K, RIW =11K 8/14/2017 8/14/2017 1.60 SLOT WELLPR MILL T OBM, 1.7 bpm, 1.7 bpm, CWT= 7.5K, 11,314.0 11,365.0 15:54 17:30 WOB = 1.7K 8/14/2017 8/14/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW = 40K, RIW = 11,365.0 11,365.0 17:30 17:54 11K 8/14/2017 8/14/2017 2.70 SLOT WELLPR MILL T OBM, CWT =9K, WOB =2.7K, 11,365.0 11,415.0 17:54 20:36 annular = 2882 psi, circ pressure = 3181 psi 8/14/2017 8/14/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000% 100 fpm, PUW = 11,415.0 11,415.0 20:36 21:00 39K, RIW = 10 K 8/14/2017 8/15/2017 3.00 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT =6KK, WOB = 11,415.0 11,462.0 21:00 00:00 2.5 K, annular = 2919 psi, FS = 854 psi, pump sweeps, slower ROP at.- 17fph,PUW =45K from 11,483' 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Continue milling from 11,462' 11,462.0 11,465.0 00:00 00:12 j 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T WT up -hole 1000' at 100 fpm, PUW = 11,465.0 11,465.0 00:12 00:42 45K, RIW = 10K, pause at 11,452'to inspect/troublshoot depth counter 8/15/2017 8/15/2017 3.50 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT = 6K, WOB = 11,465.0 11,516.0 00:42 04:12 1.9K, annular = 2923 psi, circ pressure = 3335 psi, PU from 11,472 to adjust depth counter, PUW = 44K, stall at 11,508', PUW =48K 6/15/2017 8/15/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW = 44K, RIW = 11,516.0 11,516.0 04:12 04:36 8K 8/15/2017- 8/15/2017 1.15 SLOT WELLPR MILL T A couple stalls getting to bottom, 11,516,0 11,530.0 04:36 05:45 OBM, 1.7 bpm, CWT = 4.8K, WOB = 1.6K, annular = 3012 psi 8/15/2017 8/15/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, differential 1,000 11,530.0 11,435.0 05:45 06:30 psi, higher then free spin. adjust pump rete, looks like we have chucked . motor or have a failed agitator, inspect pipe gouge, take pictures, file down gouge, inspect counter heads CTES and INJH. 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T POOH, to inspect BHA 11,435.0 74.2 06:30 08:30 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 74.2 0.0 08:30 09:00 8/15/2017 8/15/2017 1.50 SLOT WELLPR MILL T LD BHA#7. PU BHA#8, (2.81"junk 74.2 580.0 09:00 10:30 mill, BOT motor, agitator, up/down jars, 10' pup) slide in cart, stab on, RIH to 567' test agitator (good -lest) 8/15/2017 8115/2017 1.80 SLOT WELLPR MILL T RIH 580.0 10,210.0 10:30 12:18 8/15/2017 8115/2017 0.20 SLOT WELLPR MILL T Tie-in,+14'Correction 10,210.0 10,275.0 12:18 12:30 Page 10151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Llepths) e J 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log StartDepth start Time End Time Dur (hr) Phase Op code Ac Wy Code T. P -T -x Open tan (f B) EM Depth (MKS) 8/1512017 8/15/2017 0.50 SLOT WELLPR MILL T RIH 10,275.0 11,542.0 12:30 13:00 8/1512017 8115/2017 2.00 SLOT WELLPR MILL T Tag TD. BOBM, 1.7 bpm, CWT = 8K, 11,542.0 11,590.0 13:00 15:00 WOB = 2.5K, annular= 3112 psi, circ pressure= 4178 psi, Pump 1% DrillZone pill at 11,555': No Benefit, Mud -swap, New mud at bit: 11585' 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T WT up hole 1000', PUW = 45k, RIW = 11,590.0 11,490.0 15:00 15:30 10k 8/15/2017 8/1512017 0.50 SLOT WELLPR MILL T BOBM, 1.7 bpm, CWT = 12k, WOB = 11,590.0 11,599.0 15:30 16:00 2.6k, annualar = 2880 psi, circ pressure = 3464 psi 8/15/2017 6115/2017 3.00 SLOT WELLPR MILL T Mechanical coupling on injector drive 11,599.0 11,599.0 16:00 19:00 chain separated. Wait on parts and repair. Circulate botttoms up. Shut down pumps. Open EDC. Circulate 2nd bottoms up. NAD NPT 3 Hours 8/15/2017 8/15/2017 0.10 SLOT WELLPR MILL T Injector motor coupler replaced, Close 11,599.0 11,599.0 19:00 19:06 EDC. estqabish circulation at .3 BPM up to 1 BPM, PUH, PUW=45K 8/1512017 8115/2017 3.40 SLOT WELLPR MILL T PUH clean to 11,480, RBIH to mill 11,599.0 11,650.0 19:06 22:30 cement, 1.7 BPM @ 3285 PSI FS, BHP=2928 8/15/2017 811512017 0.40 SLOT WELLPR MILL T 11650, Wiper up to window with tie in 11,650.0 10,210.0 22:30 22:54 before entering GLM @ 11,666 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Log GR for+2.5' correction 10,210.0 10,259.0 22:54 23:06 8/15/2017 8115/2017 0.30 SLOT WELLPR MILL T Continue back to bottom to mill 10,259.0 11,651.0 23:06 23:24 8/15/2017 8116/2017 0.60 SLOT WELLPR MILL T 11651', Mill, 1.7 BPM @ 3331 PSI FS 11,651.0 11,659.0 23:24 00:00 8/16/2017 8/16/2017 2.40 SLOT WELLPR MILL T Continue milling cement, 1.7 BPM @ 11,659.0 11,700.0 00:00 02:24 3331 PSI FS, 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=48K 11,700.0 11,700.0 02:24 02:54 8116/2017 8/16/2017 2.60 SLOT WELLPR MILL T 11,700 Mill Cement, 1.7 BPM @ 3454 11,700.0 11,750.0 02:54 05:30 PSI FS 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=45k 11,750.0 11,750.0 05:30 05:54 8/16/2017 8/16/2017 2.20 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT = 10K, WOB = 11,750.0 11,800.0 05:54 08:06 2.7K, annular = 3010 psi, circ pressure = 3650 psi 8/1612017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,800.0 11,800.0 08:06 08:36 trip, PUW=43k 8/16/2017 8/1612017 2.50 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT =8k, WOB = 11,800.0 11,850.0 08:36 11:06 2.7k, annular = 3115 psi, circ pressure = 3815 psi, Pump 5 bbl low vis sweep at 11,825'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,850.0 11,850.0 11:06 11:36 trip, PUW=44k 8/16/2017 8/16/2017 3.00 SLOT WELLPR MILL T BOSM. Increase rate to 1.8 bpm, 11,850.0 11,904.0 11:36 14:36 CWT = 8k, WOB = 2.8k, annular= 3255 psi, circ pressure = 4820 psi, Continue pumping low vis sweep every 25'. 8/1612017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Fluid swap to 11,904.0 11,904.0 14:36 15:06 new system. Pull 1 000'wiper trip, PUW = 43k Page 11151 ReportPrinted: 912 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Smd Time End Time our (hr) phase Op Cade Anvity Code Time P-T-X Opemhm (W8) End Depth(flKB) 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T BOBM. 1.8 bpm, CWT = 12k, WOB = 11,904.0 11,950.0 15:06 17:24 2.8k, annular = 2975 psi, circ pressure = 3575 psi 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1 000'wiper 11,950.0 11,950.0 17:24 17:48 trip, PUW=45K 8/162017 8/16/2017 2.30 SLOT WELLPR MILL T 11950 Mill, 1.8 BPM @ 3504 PSI FS 11,950.0 12,000.0 17:48 20:06 8/16/2017 8/1612017 0.40 SLOT WELLPR MILL T 12000', pump sweeps, pull 1000' 12,000.0 12,000.0 20:06 20:30 1 1 wiper. PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 12,000', Mill, 1.8 BPM @ 3596 PSI. 12,000.0 12,050.0 20:30 22:48 FS, BHP=3081 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T 12050', Pump sweeps, pull 1000' 12,050.0 12,050.0 22:48 23:18 wiper, PYW=45K 8/16/2017 8/17/2017 0.70 SLOT WELLPR MILL T 12050', Mill, 1.8 BPM @ 3627 PSI FS, 12,050.0 12,066.0 23:18 00:00 BHP=3081 8/17/2017 8/172017 1.50 SLOT WELLPR MILL T 12066', Milling cement, 1.8 BPM @ 12,066.0 12,100.0 00:00 01:30 3627 PSI FS, BHP=3100 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T 12,100', Pump sweeps, pull 1000' 12,100.0 12,100.0 01:30 02:00 1 1 wiper, PUW=48K 8/17/2017 8/17/2017 1.50 SLOT WELLPR MILL T 12105', milling, 5' difference in bottom, 12,100.0 12,134.0 02:00 03:30 1.8 BPM @ 3676 PSI FS, BHP=3112 8/17/2017 8/17/2017 2.50 SLOT WELLPR MILL T Motor stall, Pull off bottom motor 12,134.0 74.2 03:30 06:00 would not relieve pressure, Diff pressire 170OPSI @.9 BPM. Can not get it to clear, Trip out for BHA. 8/17/2017 8/172017 1.10 SLOT WELLPR MILL T Verify well is dead. Unstab injector. 74.2 0.0 06:00 07:06 LD Mill, Motor, and Agitator. Test motor and agitator at surface with rig water and rig air. Inconclusive. Make up Agitator and nozzle. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Change out BOP manifold pressure 0.0 0.0 07:06 07:36 1 1 1 regulator. 8/17/2017 8/1712017 0.50 SLOT WELLPR MILL T Stab injector. Function lest Agitator 0.0 0.0 07:36 08:06 from BHA #8 at surface on coil. 1.5 bpm, 1415 differential pressure. No agitation felt at surface. 8117/2017 8/17/2017 0.50 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 0.0 08:06 08:36 #8. PU Agitator from BHA #7 and nozzle. 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T Stab injector. Function test Agitator 0.0 0.0 08:36 09:00 from BHA #7 at surface on coil. 1.5 bpm, 667psi. 1.8 bpm 825 psi. No agitation felt at surface. 8/172017 8/17/2017 0.70 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 73.6 09:00 09:42 #7. PU BHA #9. D331 Ridge Set, BOT Motor, new Agitator. Slab injector. Replace stripper pack-off. 8/17/2017 8/172017 0.30 SLOT WELLPR MILL T RIH to 480' and shallow test Agitator. 73.6 480.0 09:42 10:00 1.8 bpm. Vissible vibration on counter wheel. 8/17/2017 8/17/2017 2.20 SLOT WELLPR MILL T RIH. Tie-In+17'correction. RIHto 480.0 12,132.0 10:00 12:12 bottom. 8/17/2017 8/172017 1.30 SLOT WELLPR MILL T BOBM. 1.7 bpm, Free Spin = 870 psi, 12,132.0 12,185.0 12:12 13:30 CWT = 11 K, WOB = 2K, annular = 3190 psi, circ pressure = 4200 psi. 8117/2017 6/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=47k. 12,185.0 12,185.0 13:30 14:00 Page 12151 ReportPrinted: 9/27/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time Ehd Time [he tor) Phase Op Code Activity Code Tmie P -T -x Operation (fixe) End Depth QWB) 8/17/2017 8/17/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,185.0 12,232.0 14:00 15:00 WOB=2.5k, annular -3180 psi, circ=4200 psi. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=50k. _ 12,232.0 12,232.0 15:00 15:30 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=7k, 12,232.0 12,282.0 15:30 17:06 WOB=2.5k, annular -3300 psi, circ=4360 psi. 8/17/2017 8/17/2017 0.60 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=53k. 12,282.0 12,282.0 17:06 17:42 8/17/2017 8/17/2017 1.40 SLOT WELLPR MILL T 12282', Mill, 1.7 BPM @ 4090 PSI FS, 12,282.0 12,335.0 17:42 19:06 BHP=3320 8/17/2017 8/17/2017 0.30 SLOT WELLPR MILL T 12335, 1000'wiper, PUW=48K 12,335.0 12,335.0 19:06 19:24 8/172017 8/17/2017 2.50 SLOT WELLPR MILL T 12335', Mill, 1.7 BPM @ 4090 PSI FS, 12,335.0 12,387.0 19:24 21:54 BHP=3320, New milling fluid around @ 12362 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T 12387, 1000'wiper, PUW=52 K 12,387.0 12,387.0 21:54 22:18 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T 12387', Mill, 1.7 BPM @ 3660 PSi FS, 12,387.0 12,435.0 22:18 23:54 BHP=3395 Cement void @ 12410 to 12414 with no WOB of differential pressure 8/17/2017 8/18/2017 0.10 SLOT WELLPR MILL T 12435, 1000'wiper, PUW=53K 12,435.0 12,040.0 23:54 00:00 8/1812017 8/18/2017 0.30 SLOT WELLPR MILL T Continue 1000'wiper from 12434 12,040.0 12,434.0 00:00 00:18 8/18/2017 8/182017 1.60 SLOT WELLPR MILL T 12434', Milling, 1.7BPM @ 3352 PSI 12,434.0 12,478.0 00:18 01:54 FS, BHP=3248, Couple of stalls in 12472' area. Posible seal locator 8/18/2017 8/18/2017 1.60 SLOT WELLPR MILL T During walkaroud injector motor 12,478.0 12,464.0 01:54 03:30 coupler coming loose. PUH and circulate bottoms up. Open EDC and continue to circulate. Begin NAD NPT . Start couple repair, 1.5 Hrs NAD NPT 8118/2017 8/182017 0.60 SLOT WELLPR MILL T Repairs complete, shut EDC. 12,464.0 10,200.0 03:30 04:06 Continue wiper trip to tie in 8/18/2017 8/182017 0.20 SLOT WELLPR MILL T Log tie in for+17' correction 10,200.0 10,242.0 04:06 04:18 8118/2017 8/18/2017 0.50 SLOT WELLPR MILL T RBIH to mill cement 10,242.0 12,492.0 04:18 04:48 8/18/2017 8/18/2017 3.00 SLOT WELLPR MILL T 12490', Mill, 1.7 BPM @ 3320 PSI FS, 12,492.0 12,550.0 04:48 07:48 BHP=3267, RIW=9.3K. Multiple stalls passing through jewelry. 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Wiper trip up hole 1000'. PUW=52k. 12,550.0 12,550.0 07:48 08:18 8/18/2017 8/18/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,550.0 12,576.0 08:18 09:18 WOB=1.6k, annular -3315 psi, circ --3700 psi. 8/18/2017 8/18/2017 1.40 SLOT WELLPR MILL T Tag D Profile nipple at 12,576' Mill 12,576.0 12,576.0 09:18 10:42 through with 6 stalls. 8/18/2017 8/18/2017 0.80 SLOT WELLPR MILL T Mill 9' below profile nipple. 1.7 bpm, 12,576.0 12,585.0 10:42 11:30 WOB=1.5k, annular -3340 psi, circ --3720 psi. Stalls at 12,582. Pickup through nipple with pumps off. ' No over pulls. 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Wiper up hole. 12,585.0 10,200.0 11:30 12:00 Page 13151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stmt Depth StartTime End Time our Qv) Phase op Code Activity Cada 7me P -T -X operallon (M) End Depth (ftKa) 8/1812017 8118/2017 0.70 SLOT WELLPR MILL T Tie -In. +6.5' Correction. RIH to 10,200.0 12,300.0 12:00 12:42 logging depth. 8/18/2017 8/18/2017 0.30 SLOT WELLPR MILL T Log CCL from 12,300'to 12585' 12,350.0 12,589.0 12:42 13:00 8/18/2017 8118/2017 2.50 SLOT WELLPR MILL T POOH. Open EDC at 8975'. Close 12,569.0 73.6 13:00 15:30 EDC for Agitator test. Test Agitator at 307'. Goosneck vibrating. Re -Open EDC. 8/18/2017 8/18/2017 1.00 SLOT WELLPR MILL T PJSM. Verify well is static. Un -Stab 73.6 0.0 15:30 16:30 injector. LD BHA #9. Gauge mill 2.76" No -Go. Discuss next BHA with town. 6/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T PU BHA#10. Re -Run 2.76" D331 0.0 71.9 16:30 17:06 Ridge Set, Hailey Under Reamer with 2.875" banana blades, BOT motor, 2.73" stabilizer, BOT jars. Replace stripper packing. Stab injector. 8/18/2017 8118/2017 2.00 SLOT WELLPR MILL T RIH with EDC open. 71.9 10,200.0 17:06 19:06 8/18/2017 8/18/2017 0.20 SLOT WELLPR MILL T Log tie in point for +16' correction 10,200.0 10,260.0 19:06 19:18 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Continue in well 10,260.0 12,569.0 19:18 19:48 8/18/2017 8/18/2017 0.10 SLOT WELLPR MILL T Tag up @ 12569, Pull up to break . 12,569.0 12,559.0 19:48 19:54 over, PUW=51 K, P/U 10 mpre feet .811812017 8/19/2017 4.10 SLOT WELLPR MILL T Close ECD, Pring pumps online @ 1.7 12,559.0 10,397.0 19:54 00:00 BPM @ 4990. High vibration. Reduce rate to 1.5 BPM @ 4400 PSI. Vibration managable, Ream uphole @ 10 FPM. See additional motor work @ 12345, 12332, 12323, 12279, 12157, and 12140 8/19/2017 8/19/2017 2.30 SLOT WELLPR MILL T Continue reaming up @ 10 FPM, 1.5 10,397.0 9,100.0 00:00 02:18 BPM @ 4400 PSI FS, Ream up to orginal TOC, Pump 5 X 5 sweeps, Open edc 8/19/2017 8/19/2017 1.60 SLOT WELLPR MILL T Trip out of well, EDC open 9,100.0 101.0 02:18 03:54 8/19/2017 8119/2017 1.00 SLOT WELLPR MILL T At surface, Flow check well, PJSM lay 101.0 0.0 03:54 04:54 down BHA on dead well, U/reamer arms at 2.75" lower and 2.78" upper 8/19/2017 8119/2017 1.00 SLOT WELLPR MILL T M1U BHA #11 with 2.79 NoGo D331 0.0 74.6 04:54 05:54 mwith ridge cutters on straight BOT motor 8/19/2017 8/19/2017 2.70 SLOT WELLPR MILL T RIH. Shallow test Agitator at 328'. Tie 74.6 12,579.0 05:54 08:36 -In +21' correction. Tag D -Nipple at 12,579' 8/19/2017 8/19/2017 1.20 SLOT WELLPR MILL T Dress up D -Nipple. 1.7 bpm. Free 12,576.0 12,587.0 08:36 09:48 Spin: 840 psi. High vibration. 1 Stall. Tag TD. Drift back through minimum rale. Make 7 down reaming passes. 8/19/2017 8/19/2017 2.20 SLOT WELLPR MILL T POOH. Shallow test agitator. 12,587.0 102.0 09:48 12:00 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T Verify well is sialic. PJSM. Un -Stab 102.0 0.0 12:00 13:00 Injector. LD BHA #11. Gauge mill 2.75" No Go. 8/1912017 8/19/2017 1.50 SLOT WELLPR MILL T Discuss next BHA with town. PU BHA 0.0 74.7 13:00 1430 #12, 2.80" slick D331. Check packing in stripper. Stab Injector. Page 14151 Report Printed: 9127/2017 Operations Summary (with Timelog L/epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sbh Stud me Ti End Time Ow(h4 Phase op Cade Activity Time me PJA opereWn (ftim) End Depen(dtu) 8119/2017 8/19/2017 2.10 SLOT WELLPR MILL T RIH. Shallow test Agitator at 380'. Tie 74.7 12,587.0 14:30 16:36 -In +20' correction. pass through D - Nipple at 12577, Tag bottom @ 12,587 8/19/2017 8/19/2017 1.80 SLOT WELLPR MILL T Make multiple passes through nipple 12,587.0 12,580.0 16:36 18:24 area, 5. Dry drift nipple area - good 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T POOH, stop and open EDC @ 12556 12,580.0 95.0 18:24 20:30 8/19/2017 8/19/2017 0.50 SLOT WELLPR MILL T At surface, Flow check well, Lay down 95.0 0.0 20:30 21:00 BHA #12, Mill out @ 2.79 NoGo 8/19/2017 8/19/2017 1.30 PROD1 RPEQPT PULD P Make up BHA # 13 with new D-331 0.0 68.5 21:00 22:18 slick gauge mill, .9° AKO motor and agitator, M/U to will and surface test, Inspect packoffs 8/19/2017 8/20/2017 1.70 PROD1 RPEQPT TRIP P Trip in hole, BHA #13 pilot hole 68.5 8,660.0 22:18 00:00 milling, 700'shallow test agitator - good. Continue in 8/20/2017 8/20/2017 0.30 PROD1 RPEQPT TRIP P Continue tripping in well 8,660.0 10,200.0 00:00 00:18 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT DLOG P Log Gamma tie in for+15.5', 10,200.0 10,249.1 00:18 00:30 8/20/2017 8/20/2017 0.70 PROD1 RPEQPT TRIP P Continue trip in, Bring pump online @ 10,249.1 12,588.0 00:30 01:12 12544. Clean passthrough milled D nipple area 8/20/2017 8/20/2017 6.50 PROD1 RPEQPT MILL P Tag up @ 12588 and mill ahead, 1.7 12,588.0 12,716.0 01:12 07:42 BPM @ 3588 PSI FS. Stall and hard going @ 12598. Call 7" contact. Had to roll TF to 200° to get milling. 12599' roll TF back to 20R, ROP 20-25 FPH with - 2K DHWOB. Stalls at 12,703' and 12,705'. Orienter loosing high side at 12708' Suspect magnetic interference. Lock orienter 20R. 8/20/2017 8120/2017 0.40 PROD1 RPEQPT MILL T Injector coupling separating again. 12,716.0 12,589.0 07:42 08:06 1 Pickup into tubing tail to repair. 8/20/2017 8120/2017 0.10 PROD1 RPEQPT MILL T RIH back to bottom. 12,589.0 12,716.0 08:06 08:12 8/20/2017 8/20/2017 3.60 PROD1 RPEQPT MILL P BOBM. 1.7 bpm, WOB=2k, 12,716.0 12,755.0 08:12 11:48 Annular -3510 psi, Pump=4090 psi. Orienter locked based on internal highside toolface. 3 stalls at 12,730'. Pickup and re -verify toolface. Difficulty working past 12,730' ROP returned to 207hr after passing. TO pilot hole at 12,755' . , 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P POOH to back ream transition. 12,755.0 12,603.0 11:48 11:54 PUW=48k. 8/20/2017 8/20/2017 0.30 PROD1 RPEQPT REAM P Orient low side. Back ream transition. 12,603.0 12,584.0 11:54 12:12 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT TRIP P TH. HOT still giving erratic readings 12,584.0 12,755.0 12:12 12:24 at 12,619' and 12,708'. Pump 5 x 5 sweep at TD. 8/20/2017 8/20/2017 0.60 PROW RPEQPT CIRC P PUH into tubing tail. Wait for sweeps 12,755.0 12,476.0 12:24 13:00 11 to surface. 8/20/2017 8/20/2017 0.40 PROW RPEQPT DLOG P Dry drift from tubing tail into pilot hole. 12,476.0 12,755.0 13:00 13:24 Tie -In with 1<1 marker. Zero Correction. I set downs 12,595' and 12,615'. Tag TD. Page 15151 ReportPrinted: 9/27/2017 -# Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start TM End Tim Der (hr) Phase op Cade Addy Code rime P -T -X opemmm it") End Depth lmm) 8/20/2017 8/20/2017 1.50 PROD1 RPEQPT REAM P Back ream from 12,61V to tubing tail. 12,755.0 12,584.0 13:24 14:54 Dry drift second time: 1k weight at 12,595' and 0.5k at 12,615'. Back ream from 12,615' to tubing tail. Dry drift third time. PUH. Ream down at 5'/min, back ream up. Dry drift fourth time. Weight bobble less than 0.75k. 8/20/2017 8/20/2017 2.00 PROD1 RPEQPT TRIP P POOH. Shallow test Agitator at 580'. 12,620.0 109.0 14:54 16:54 1 1 Good test. 8/20/2017 8/20/2017 1.80 PROD1 RPEQPT PULD P PJSM. Verity well is static. Unstab 109.0 0.0 16:54 18:42 Injector. LD BHA #13. Gauge Mill: 2.80 No Go. 8/20/2017 8/20/2017 1.00 PROD1 RPEQPT PULD P PJSM, M/U BHA #14 HES caliper, 0.0 24.6 18:42 19:42 M/U to coil and surface test caliper. 8/20/2017 8/20/2017 2.30 PROD1 RPEQPT TRIP P RIH BHA #14 pilot hole caliper run 24.6 12,500.0 19:42 22:00 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT DLOG P Tie into K1 for+19.3 12,500.0 12,658.0 22:00 22:12 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P Continue in well 12,658.0 12,744.0 22:12 22:18 8/20/2017 82012017 0.10 PROD1 RPEQPT DLOG P PUH logging pilot hole 1st run, 12,744.0 12,500.0 22:18 22:24 PUW=52K 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P Trip back to bottom 12,500.0 12,744.0 22:24 22:30 8/20/2017 8/20/2017 1.30 PROD1 RPEQPT DLOG P PUH logging to 8900, PUW=52K 12,744.0 8,900.0 22:30 23:48 8/2012017 8/2112017 0.20 PROD1 RPEQPT TRIP P End of logging pass, Close caliper 8,900.0 8,503.0 23:48 00:00 1 1 fingers, Trip out of well 8/21/2017 8/21/2017 1.50 PROD1 RPEQPT TRIP P Continue tripping out with HES caliper 8,503.0 67.0 00:00 01:30 8/21/2017 8/21/2017 0.30 PROD1 RPEQPT PULD P PJSM, Lay down BHA #14 on dead 67.0 0.0 01:30 01:48 well 8121/2017 821/2017 1.20 PROD1 RPEQPT PULD P PJSM, M/U BHA #15, Whipstock with 0.0 74.0 01:48 03:00 OH anchor, M/U to coil and surface test 8/21/2017 8/212017 2.40 PROD1 RPEQPT TRIP P RIHw/Whipstock 74.0 12,600.0 03:00 05:24 8/2112017 8/21/2017 0.10 PROD1 RPEQPT DLOG P Log K1 for +15.5 12,600.0 12,625.0 05:24 05:30 8/21/2017 8/21/2017 0.70 PROD1 RPEQPT TRIP P Continue to setting depth, PUW=49K, 12,625.0 12,722.7 05:30 06:12 continue up hole to 12695 trying to get orientation to clear up. PUH to 12635, RBIH to 12655'. tool seems stable, RBIH to set depth 12,722.7. Using internal TF. Close EDC. Pumps on, See tool shift @ 3700 PSI, DHWOB to 2.02K. Set down 2.5K - Good. 8/21/2017 8/21/2017 2.80 PROD1 RPEQPT TRIP P Open EDC. POOH. 12,722.7 100.0 06:12 09:00 8/21/2017 8212017 0.20 PROD1 RPEQPT CTOP T Observe CT indention at 79.5' from 100.0 100.0 09:00 09:12 whip end. Photograph damage. 8/21/2017 82112017 0.80 PROD1 RPEQPT PULD P PJSM. Verify well is static. Un -Slab 100.0 0.0 09:12 10:00 injector. LDBHA#15. 8121/2017 821/2017 1.00 PROD1 RPEQPT CIRC P Close master valve. PU nozzle. Re- 0.0 0.0 10:00 11:00 Stab injector. Jet out stack and surface lines. Page 16151 ReportPrinted: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth start Time End Time Our (M) Phew Op Code Activity Code Time P -T -X operation MKB) End Depth (IlKD) 8/21/2017 8/21/2017 1.50 PRODt RPEQPT CIRC P Un -stab injector. Grease tree valves. 0.0 0.0 11:00 12:30 Install test joint cycle rams and circulate citric acid through stack. Pull test joint cycle rams and circulate citric acid followed by fresh water. Install BOP test cap. 8/21/2017 8/21/2017 0.80 FROM RPEQPT BOPE P PJSM. Begin BOP test at 12:30 0.0 0.0 12:30 13:18 hours. Witness waived by AOGCC (Jeff Jones). Tests to 250 psi low, . 42000 psi high. Attempt shell test. Regrease C5. Replace bleeder on C4. 8/21/2017 8/21/2017 1.60 PROD! RPEQPT BOPE P Test#1 (Upper Swab): Pass 0.0 0.0 13:18 14:54 Test #2 (Obsolete) Test #3 (Lower Blind/Shear, TV2): Pass Test #4 (TV1): Pass Test #5 (Upper Blind/Shear, B1, B5, C4, C5, C8, C12, R1, BL1): Pass Test #6 (C3, C6, C7, C11, B2, B6, T2): Fail 8/21/2017 8/212017 0.60 FROM RPEQPT BOPE T Re -Grease C7 and C11. 0.0 0.0 14:54 15:30 1 1 1 Re -Test #6: Pass 8/21/2017 8/21/2017 2.90 FROM RPEQPT BOPE P Test#7 (Choke D, Choke C): Pass 0.0 0.0 15:30 18:24 (1500 psi / Function) Test #8 (C2, C10, T1): Pass Test #9 (R2, BL2, C1, C9): Pass Test #10 (B4, B8, R3, BL3): Pass Test #11(83, 67): Pass Remove tree cap. Install test joint and fill. Test gas alarms: Pass Test #12 (Annular): Pass (2500 psi) Test #13 (Upper 2-3/8, Upper TI W): Pass Test #14 (Lower 2-3/8): Pass Test #15 (Lower Pipe/Slip): Fail 8121/2017 8/21/2017 0.60 FROM RPEQPT BOPE T Cycle ram. 0.0 0.0 18:24 19:00 Re -Test #15: Pass 8/21/2017 8/21/2017 2.10 FROM RPEQPT BOPE P Test#16 (Upper Pipe/Slip, Lower 0.0 0.0 19:00 21:06 TIW): Pass Accumulator recharge: Pass Remove test joint. Re -Stab Injector. Test inner reel valve and stripper: Pass BOP test complete. Blow down drilling choke. 8/21/2017 8/21/2017 0.90 PROD1 RPEQPT CTOP T LD nozzle, blind sub, and UQC. Boot 0.0 0.0 21:06 22:00 wireline. Stab injector. Pump slack backwards. Un -stab injector. 8/21/2017 8/222017 2.00 FROM RPEQPT CTOP T PJSM. Cul 193' of coil to remove 0.0 0.0 22:00 00:00 damage. Cut 88' pipe to find wire 8/22/2017 8/22/2017 2.00 FROM RPEQPT CTOP T Continue making up coil tubing 0.0 0.0 00:00 02:00 connector, Pull test to 35K - Good. M/U UQC, Test wire (>550 Mohms /77.4 Ohmes). Fluid pack coil and pressure test CTC and UQC to 4450 PSI 8/22/2017 8/22/2017 0.50 PROM RPEQPT CTOP T Skid back injector / Run pipe into pipe 0.0 0.0 02:00 02:30 shed inspecting gripper blocksL - I Chains for damage or foreign objects Page 17151 Report Printed: 912 712 01 7 ' •: Operations Summary (with Timelog uepths) -I. 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log star) Time End Tim Dir (Er) Phase Op Care Activity Catle Time P-T-X Operation tried Depth (Ito) End Depth (aKB) 8/22/2017 8/2212017 1.30 PROD1 WHPST PULD P PJSM, M/U P/U BHA # 16 Window 0.0 74.3 02:30 03:48 milling BHA with .6° motor, 2.79 string reamer, and 2.80 dimond window mill, Make up to coil and surface test - good 8/22/2017 8/22/2017 2.30 PROD1 WHPST TRIP P RIH, EDC open, Pumping 1 BPM 74.3 12,583.0 03:48 06:06 8/22/2017 8/22/2017 0.70 PROD1 RIGMNT TRIP T Inspect coupler I Tighten 12,583.0 12,583.0 06:06 06:48 8/22/2017 8/22/2017 0.10 PROD1 WHPST TRIP P Continue in well 12,583.0 12,600.0 06:48 06:54 8/22/2017 8/22/2017 0.10 PROD1 WHPST DLOG P Log K1 for+15.5' 12,600.0 12,628.0 06:54 07:00 8/22/2017 8/22/2017 0.70 PROD1 WHPST TRIP P Continue in well displaceing used 12,628.0 12,713.0 07:00 07:42 8.8ppg PwrPro tripping in, stop @ - 12651 and close EDC, Dry tag whipstock @ 12713. Having tool face issues. go to MWD internal toolface 8/22/2017 8/22/2017 4.80 PROD1 WHPST MILL P Milling window, 12713', 1.6BPM @ 12,713.0 12,719.0 07:42 12:30 3685 PSI FS, BHP=3753 8122/2017 6/22/2017 3.40 PROD1 WHPST MILL P Call bottom of window 12719, Milling 12,719.0 - 12,735.0 12:30 15:54 rathole 8/22/2017 8/22/2017 2.50 PROD1 WHPST REAM P At bottom of rat hole, ream window 12,735.0 74.0 15:54 18:24 per procedure, PUW=40K As drilled, 30° ROHS, 30° LOHS, 180° ROHS 8/22/2017 8/22/2017 3.00 PROD1 WHPST TRIP P POOH, Marks and Gouge on coil, take 74.0 74.0 18:24 21:24 pictures, and upload to sArive. 8/22/2017 8/22/2017 0.70 PROD1 WHPST OWFF P Al surface, check well for flow, PJSM 74.0 74.0 21:24 22:06 8/22/2017 8122/2017 1.60 PROD1 WHPST PULD P PUD & LD Window milling BHA, 74.0 0.0 22:06 23:42 `•` Window Mill 2.78 no-go, string mill 2.79 no-go 8/22/2017 8/23/2017 0.30 PROD1 DRILL PULD P PU/MU Build Section BHA# 17 0.0 0.0 23:42 00:00 8/23/2017 8/23/2017 0.50 PROD? DRILL PULD P Continue. PU/MU/ PD build section 0.0 0.0 00:00 00:30 BHA# 17 8/23/2017 8/23/2017 1.00 PROD1 DRILL PULD T Scope change, kink in slick line. 0.0 0.0 00:30 01:30 PJSM, swap to ODS PDL. 8123/2017 8/23/2017 1.50 PROD1 DRILL PULD P Continue PD Buld BHA# 17 0.0 72.2 01:30 j 03:00 8/23/2017 8/23/2017 0.20 PRODI DRILL PULD P Surface test BHI tools (good lest), 72.2 72.2 03:00 03:12 stab INJH, tag up, reset counters 8123/2017 8/23/2017 2.30 PROD1 DRILL TRIP P RIH 72.2 12,565.0 03:12 05:30 8/23/2017 6/23/2017 0.20 PROD1 DRILL DLOG P Log K1 for+20.5' 12,585.0 12,633.0 05:30 05:42 8/23/2017 8/23/2017 0.20 PROD? DRILL TRIP P Continue in well, Close EDC @ 12,633.0 12,735.0 05:42 05:54 12677, PUW=44K, Clean pass through window, Tag up at 12735 ' 8/23/2017 8/23/2017 1.80 PROD1 DRILL DRLG P 12735', Drill, 1.8 BPM @ 4375 PSI 12,735.0 12,808.0 05:54 07:42 FS, BHP=3846 8/23/2017 8/23/2017 0.20 PROD1 DRILL WPRT P PUH to tie in and log RA, PUW=42K 12,808.0 12,600.0 07:42 07:54 8/23/2017 8/23/2017 0.10 PROD1 DRILL DLOG P Log K1 for A' RIH and log RA @ 12,600.0 12,730.0 07:54 08:00 1 1 12719, TOWS=12712.5 8/23/2017 8/2312017 0.30 PROD1 DRILL WPRT P RBIH to drill 12,624.0 12,808.0 08:00 08:18 1 1 Page 18151 Report Printed: 912712017 . Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Stan Time End Time Dur (m) Phase Op Code AcWdy Code Time P -T -X Operation (rtD End Depth laXB1 8/23/2017 8/23/2017 2.20 PROD? DRILL DRLG P 12808', Drill ahead, 1.8 BPM @ 4352 12,808.0 12,818.0 08:18 10:30 PSI FS, BHP=3902 8/23/2017 8/23/2017 6.50 PROD1 DRILL DRLG P PUW 40 k, OBD 1.8 bpm at 4318 psi 12,818.0 12,950.0 10:30 17:00 FS, BHP 3,897, IA 0, OA 483 8/23/2017 8/23/2017 2.50 PROD1 DRILL TRIP P PUH slowly until sweep out the bit, 12,950.0 72.2 17:00 19:30 POOH 8123/2017 8/23/2017 1.15 PROD1 DRILL PULD P PJSM, PUD & LD build section BHA 72.2 0.0 19:30 20:39 8/2312017 8/23/2017 1.50 PROD1 DRILL PULD P PU/MU/PD lateral section BHA, BHA# 0.0 782 20:39 22:09 18, surface test tools (good -test) 8/23/2017 8/24/2017 1.85 PROD1 DRILL TRIP P Tag up, reset counters, RIH 78.2 8,500.0 22:09 00:00 8/24/2017 8/2412017 0.50 PROD1 DRILL TRIP P Continue RIH 8,500.0 12,595.0 00:00 00:30 8/24/2017 8/2412017 0.10 PROD1 DRILL DLOG P Log the K1 marker correction of plus 12,595.0 12,615.0 00:30 00:36 22', PUW 41 k, RIW 13 k 8/24/2017 8/24/2017 0.30 PROD1 DRILL TRIP P Continue in well 12,615.0 12,951.0 0036 00:54 8/24/2017 8/24/2017 3.40 PROW DRILL DRLG P OBD 1.8 bpm at 4,896 psi FS, BHP 12,951.0 13,360.0 00:54 04:18 3970, WHP 106, IA 0, OA 373, CTSW=12 k, DHWOB=2.0 k, ROP=100 fph 8124/2017 8/24/2017 0.40 PRODt DRILL WPRT P Wiper to 12980', PUW=41K 13,360.0 13,360.0 04:18 04:42 8/24/2017 8/24/2017 9.00 PROW DRILL DRLG P 13360', Drill, 1.76 BPM @ 4785 PSI 13,360.0 13,760.0 04:42 13:42 FS, BHP=3843, RIW=10.8K, Encountered more Ankorite 8/24/2017 8/24/2017 0.75 PROD1 DRILL WPRT P 13760', Wiper to 12975', PUW=45K 13,760.0 13,760.0 13:42 14:27 8/24/2017 8/2412017 6.40 PROD1 DRILL DRLG P 13760', Drill, 1.8 BPM @ 5037 PSI 13,760.0 14,160.0 14:27 20:51 FS, BHP=3862 PSI, RIW=10K 8/242017 8/24/2017 0.50 PROD1 DRILL WPRT P Wiper up hole to 12,725', PUW 45 k 14,160.0 12,735.0 20:51 21:21 824/2017 8124/2017 0.25 PROD1 DRILL DLOG P Log the RA correction of plus 2.5' 12,735.0 12,766.0 21:21 21:36 8124/2017 824/2017 0.50 PROD1 DRILL WPRT P Wiper back in hole, RIW 13 k 12,766.0 14,160.0 21:36 22:06 8/242017 8/25/2017 1.90 PROW DRILL DRLG P BOBD 1.8 bpm at 3,908 psi FS, BHP 14,160.0 14,167.0 22:06 00:00 3,946, WHIP 67, IA 0, OA 560, CTSW =11.3 k, DHWOB=2.9 k, ROP 2 fph 8/25/2017 8/25/2017 3.50 PRODII DRILL DRLG P OBD, 1.8 bpm at 5,153 psi, 14,167.0 14,339.0 00:00 03:30 BHP=3,975, WHP=63, IA=O, OA=546, CTSW=4.4 k, DHWOB=2.9 k, ROP 60 fph 8/2512017 8/25/2017 3.30 PROD1 DRILL DRLG P OBD, 1.8 bpm at 5,395 psi, 14,339.0 14,560.0 03:30 06:48 BHP=3,975, WHP=55, IA=O, OA=569, CTSW=2.2 k, DHWOB=2.5 k, ROP=62 fph 8/25/2017 8/25/2017 0.70 PROD1 DRILL WPRT P 14560', Wiper to 13560', PUW=45K 14,560.0 14,560.0 06:48 07:30 8/2512017 8/25/2017 4.40 PROD1 DRILL DRLG P 14560', Drill 1.78 BPM @ 5100 PSI 14,560.0 14,875.0 07:30 11:54 FS, BHP=3956, Avg ROP 40-60 FPH, Encountered signs of ankorite with low to no ROP. Good weight transfer 8/25/2017 8/252017 0.30 PROW DRILL WPRT P Pull Mini wiper, PUW=52K 14,875.0 14,875.0 11:54 12:12 Page 19151 Report Printed: 9127120171 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stmt Time End Time arh Dur(hr Phase cP code Activity code Time P -T -X Operation (n103) End DEgh M) 8/25/2017 8/25/2017 6.00 PROD1 DRILL DRLG P 14875', Drill, 1.75 BPM Qo 5100 PSI 14,875.0 14,920.0 12:12 18:12 FS, BHP=4002 8/2512017 8/25/2017 0.25 PROM DRILL WPRT P BHA wiper 14,920.0 14,920.0 18:12 18:27 8/25/2017 8/25/2017 1.50 PROD1 DRILL DRLG P BOBD, 1.8 bpm at 5,493 psi, 14,920.0 14,960.0 18:27 19:57 BHP=3,975, WHP=41, IA=O, OA=600, CTSW=10 k, DHWOB=2.7 k, ROP=22 fph 8/25/2017 8/25/2017 1.00 PROM DRILL WPRT P Wiper up hole to 13,960'(1000'), PUW 14,960.0 14,960.0 19:57 20:57 43 k 8/25/2017 8/26/2017 3.05 PROD1 DRILL DRLG P BOBO, 1.8 bpm at 3,972 psi FS, 14,960.0 14,994.0 20:57 00:00 BHP=4,024, WHP=O, IA=O, OA=605, CTSW=11.6 k, DHWOB=2.8 k, . ROP=2 fph, TO lateral 8/26/2017 8/2612017 1.50 PROD1 DRILL WPRT P Pump 10x10 sweep, perform swab 14,994.0 12,944.0 00:00 01:30 wiper, PUW 44 k 8/26/2017 8/26/2017 1.15 PROD1 DRILL WPRT P Notice increase of 600 psi diff while 12,944.0 12,577.0 01:30 02:39 wiper up hole thru build section, RBIH, turn TF 180" from drilled TF, diff is lower, perform 7 clean out passes, no change, continue wiper up hole thru window to 12,596', 8/26/2017 8/26/2017 2.00 PROD1 DRILL WPRT P Perform static pressure survey, 11.7 12,577.0 78.2 02:39 04:39 ppg (3,700 psi annular), Open EDC, POOH pumping max rate, filling trip sheet 8/26/2017 8/26/2017 0.50 PROM DRILL TRIP P Tag up at surface, inspect INJH, reset 78.2 78.0 04:39 05:09 counters. 8/26/2017 8/26/2017 2.80 PROD1 DRILL TRIP P Trip in hole, EDC open, Pumping 78.0 12,595.0 05:09 07:57 8/26/2017 8/26/2017 0.10 PROD1 DRILL DLOG P Log K1 for+5.5, PUW=44K, Close 12,595.0 12,631.0 07:57 08:03 EDC 8/26/2017 8/26/2017 1.70 PROM DRILL TRIP P Continue in hole, dean through 12,631.0 14,960.0 08:03 09:45 window, Initial tag up Qa 14960. Worked down to 14992. PUH waiting on beader liner pill. Hard time getting back in past 14960'. Call that bottom 8/26/2017 8/26/2017 3.10 PROD1 DRILL TRIP P Trip out pumping 12.OPPG beaded 14,960.0 98.0 09:45 12:51 liner running pill followed with 12 PPG completion fluid. Paint EOP flags 13150 & 10800' 8126/2017 8/26/2017 0.30 PRODt DRILL PULD P At surface, PJSM lay down BHA on 98.0 98.0 12:51 13:09 dead well, Flow check well - good 8/26/2017 8/26/2017 1.10 PROW DRILL PULD P Break off injector anf skid back, Lay 98.0 0.0 13:09 14:15 down BHA #18 8/26/2017 8/26/2017 0.70 COMM CASING RURD P PJSM, R/U to run liner, service 0.0 0.0 14:15 14:57 elevators and top drive 8/26/2017 8/26/2017 4.25 COMPZI CASING PUTB P M/U BHA #19 with non ported 0.0 1,763.2 14:57 19:12 bullnose, 3 pup joints, Me slotted liner, 2 tracers T-165 & T940, 40 As slotted liner, Aluminum liner top billet 8/26/2017 8/26/2017 2.50 COMPZI CASING RUNL P Test BHI Coiltrak tools (good test), tag 1,763.2 12,607.0 19:12 21:42 up, reset counters, RIH 8/26/2017 8/2612017 0.15 COMPZI CASING RUNL P E flag, no correction, PUW 42 k 12,607.0 12,607.0 21:42 21:51 8/26/2017 8/26/2017 0.50 COMPZI CASING RURL T Tighten Coupler on INJH 12,607.0 12,607.0 21:51 22:21 8/2612017 8/26/2017 1.00 COMPZ1 CASING RUNL P Continue IH, RIHCTSW=12 k, 12,607.0 14,994.0 22:21 23:21 RIHDHWOB=O k Page 20151 Report Printed: 9/2 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Sled T. End Time or (N) Phase Op Cade Activity Code Time P -T-% OpenMn (WB) End Depth (10(8) 8/26/2017 8/26/2017 0.15 COMPZ1 CASING RUNL P Tag bottom at 14,996', PUW 51 k, 14,994.0 13,230.4 23:21 23:30 CTSW=51 k, DHWOB=minus 5.6 it, set back down, bring pump up to 1.7 bpm, 0.80 bpm returns, PUH, CTSW=38 k, DHWOB= 0 k, release liner on bottom. 8/26/2017 8/27/2017 0.50 COMPZ1 CASING TRIP P Remove liner length from BHA, POOH 13,230.4 9,945.0 23:30 00:00 8/27/2017 8/27/2017 1.25 COMPZ1 CASING TRIP P Continue POOH wtih liner setting 9,941.0 44.2 00:00 01:15 tools, pumping 1.0 bpm at 2,288 psi 8/27/2017 8/27/2017 0.50 COMPZ1 CASING OWFF P At surface, check well for flow ( no- 44.2 44.2 01:15 01:45 flow), PJSM 8/272017 8/27/2017 0.50 COMPZ1 CASING PULD P LD liner setting tools BHA# 19 44.2 0.0 01:45 02:15 8/27/2017 8/27/2017 0.50 PROD2 STK PULD P PU/MU kickoff/drilling BHA# 20 0.0 78.3 02:15 02:45 w/Hycalog Ct bi-center bit and agitator, surface test BHI Coiltrak tools (go test) 8/27/2017 8/27/2017 1.50 PROD2 STK TRIP P Tag up, reset counters, RIH, pumping 78.3 6,480.0 02:45 04:15 min rate 8/27/2017 827/2017 0.50 PROD2 STK CTOP T Tighten INJH coupler 6,480.0 6,480.0 04:15 04:45 8/27/2017 827/2017 0.90 PROD2 STK TRIP P Continue RIH 6,480.0 12,595.0 04:45 05:39 8/27/2017 8/27/2017 0.20 PROD2 STK DLOG P Log K1 correction of+5.5 12,595.0 12,620.0 05:39- 05:51 8/27/2017 8/27/2017 0.10 PROD2 STK TRIP P Continue in well 12,620.0 12,700.0 05:51 05:57 8/27/2017 8127/2017 1.70 PROD2 STK CIRC P Displace well back to 8.8 PPG 12,700.0 12,700.0 05:57 07:39 PwrPro, close EDC, PUW=46K 8/27/2017 8/27/2017 0.50 PROD2 STK TRIP P Continue in well, Clean pass through 12,700.0 13,232.0 07:39 08:09 window, Dry tag liner top billet @ 13232 827/2017 8/27/2017 0.70 PROD2 STK MILL P PUH, Bring on pumps @ 1.76 BPM @ 13,232.0 13,233.0 08:09 08:51 5350 PSI FS, BHP=3940. See motor work and DHWOB @ 13232, Mill @ 1 FPH 8/27/2017 8/27/2017 0.60 PROD2 STK MILL P Go to 2 FPH time milling 13,233.0 13,234.0 08:51 09:27 8272017 8/27/2017 0.40 PROD2 STK MILL P Go to 3 FPH time milling 13,234.0 13,235.0 09:27 09:51 827/2017 8/27/2017 0.80 PROD2 DRILL DRLG P 12235', Start drilling ahead, Had one 13,235.0 13,270.0 09:51 10:39 stall, reset and drill, 1.75 BPM @ 5350 PSI FS, BHP=3873 8/27/2017 8/27/2017 0.20 PROD2 DRILL WPRT P PUH to dry drift billet area, Set down 13,270.0 13,270.0 10:39 10:51 @ 13237, PUH then run through clean 8272017 8/27/2017 3.40 PROD2 DRILL DRLG P 13270', Drill, 1.73 BPM @ 5400 PSI 13,270.0 13,660.0 10:51 14:15 FS, BHP=3927 8/27/2017 8/27/2017 0.40 PROD2 DRILL WPRT P 13660, Wiper to 13250, PUW=44K 13,660.0 13,660.0 14:15 14:39 8/27/2017 827/2017 1.00 PROD2 DRILL DRLG P 13660', Drill, 1.73 BPM @ 5680 PSI 13,660.0 13,722.0 14:39 15:39 FS, BHP=4022 8127/2017 8/27/2017 0.15 PROD2 DRILL WPRT P PUW 45 k, BHA wiper 13,722.0 13,722.0 15:39 15:48 8/272017 8/2712017 5.00 PROD2 DRILL DRLG P BOBD, 1.74 bpm at 5,681 psi FS, 13,722.0 14,064.0 15:48 20:48 BHP=5,562, WHP=9, IA=O, OA=528, CTSW=4.5 k, DHWOB=2.2 it, ROP=42 fph Page 21151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth SMTM End Time our (hr) Phase Op Code Activity Code Time P-T-% Operation (ftKB) End Depth(ftKS) 8/2712017 8/27/2017 0.75 PROD2 DRILL WPRT P Wiper up hole to 13,300', PUW 44 k, 14,064.0 14,064.0 20:48 21:33 wiper back in hole, RIW=6 k 8/27/2017 8/28/2017 2.45 PROD2 DRILL DRLG P BOSD, 1.79 bpm at 6,045 psi FS, 14,064.0 14,212.0 21:33 00:00 BHP 4,074, WHP 8, IA=O, OA=528, CTSW=minus 1 k, DHWOB=1.5 k, ROP=90 fph ••. 14,187', DHWOB=3.5 k, CTSW=2.5 k, ROP=O, PUW 50 k, stack back down minus 15 k, PUW 72 k, pipe free, pull 200' wiper 8128/2017 8/28/2017 1.75 PROD2 DRILL DRLG P OBD, 1.73 bpm at 6,430 psi, BHP 14,212.0 14,318.3 00:00 01:45 4074, WHP 0, IA 0, OA 532, CTSW= minus 1.7 k, DHWOB=2.2 k, ROP=55 k 8/28/2017 8/28/2017 0.25 PROD2 DRILL WPRT P Short Wiper up hole to 14,159', PUW 14,318.3 14,318.0 01:45 02:00 42 k, HOT was against the stops, rotate TF 8/28/2017 8/28/2017 1.50 PROD2 DRILL DRLG P BOBO, 1.74 bpm at 5,319 psi, BHP 14,318.0 14,460.0 02:00 03:30 4,178, WHP 0, IA 0, OA 539, CTSW=6 k, DHWOB=1.3 k, ROP=110 fph *** New Mud at the bit 14,333P ................ '•• Old Mud Stats: 1,931' DF, 0.9% DS 8/28/2017 8/28/2017 0.75 PROD2 DRILL WPRT P Wiper up hole for lie in, PUW 44 k 14,460.0 12,735.0 03:30 04:15 8/28/2017 8/28/2017 0.15 PROD2 DRILL DLOG P Log the RA correction of plus 5.5' 12,735.0 12,753.0 04:15 04:24 8/28/2017 8/28/2017 0.70 PROD2 DRILL WPRT P RIH, RIW 11 k 12,753.0 14,460.0 04:24 05:06 8/28/2017 8/2812017 3.80 PROD2 DRILL DRLG P BOBD, 1.75 bpm at 5595 PSI FS, 14,460.0 14,700.0 05:06 08:54 BHP=4039, Pump 10 BBI beaded pill to evaluate weight transfer @ 14692. No difference. Surface weight @ -5K 8/28/2017 8/2812017 3.90 PROD2 DRILL DRLG P 14700, Drill aheadl.7 BPM @ 5595 14,700.0 14,860.0 08:54 12:48 1 PSI FS, BHP=4120 8/28/2017 8/28/2017 0.90 PROD2 DRILL WPRT P 14860', 1000'wiper, PUW=45K 14,860.0 14,860.0 12:48 13:42 8/28/2017 8128/2017 0.60 PROD2 DRILL DRLG P 14860', Drill, 1.7 BPM @ 6096 PSI 14,860.0 14,882.0 13:42 14:18 FS, BHP=4099. Pressure is high across BHA. Circ pressure up 500 PSI. Reduce rate to 1.6 BPM @ 5740 PSI FS 8/28/2017 8/28/2017 2.80 PROD2 DRILL TRIP T 14882, Lost differential pressure on 14,882.0 77.0 14:18 17:06 bottom, Trip out 8/28/2017 8/28/2017 1.90 PROD2 DRILL PULD T PUD BHA #20, Scope change, Floats 77.0 0.0 17:06 19:00 not holding. Power up coiltrak and closed EDC. Continue pressure undeploy 8/28/2017 8/28/2017 0.80 PROD2 DRILL CTOP T M/U agitator to coil. Stab on well. 0.0 0.0 19:00 19:48 circulate through agitator. .5 BPM @ 1605 PSI with .513PM out. Unstab injector and lay down agitator 8/28/2017 8/28/2017 0.40 PROD2 DRILL BOPE P Perform Bi-weekly BOPE function test 0.0 0.0 19:48 20:12 1- Good 8/28/2017 8/28/2017 1.80 PROD2 DRILL PULD T PD pre loaded BHA#21 with V 0.0 62.6 20:12 22:00 1 motor, Re run bi center. No res tool or agitator, Surface test tool - Good. Page 22151 Report Printed: 912712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log S art Deem Start Tom End Time Dur(hr) Phase Op Code Activity Cotle Time P -T -X Operetlon (flK6) Ertl BepM (fll(a) 8/28/2017 8/28/2017 1.50 PROD2 DRILL PULD T Identified hydraulic leak on lower 62.6 0.0 22:00 23:30 shear / seal actuator, PJSM, PUD BHA #21, Nabors Tool Pusher dispatched mechanic to repair acctuator. 828/2017 8/29/2017 0.50 PROD2 DRILL EQRP T Prep for hydraulic leak repair, vac out 0.0 0.0 23:30 00:00 fluid in stack, lockoutttagout koomey unit. 8/29/2017 8/29/2017 2.50 PROD2 DRILL EQRP T Continue repairing leak on lower blind 0.0 0.0 00:00 02:30 shear ram actuator - Total Nabors NPT 4.5 hrs 8/29/2017 8/29/2017 1.15 PROD2 DRILL PULD T PJSM, PD drilling BHA# 21 0.0 62.5 02:30 03:39 8/29/2017 6/29/2017 2.25 PROD2 DRILL TRIP T RIH, with cleanout/confirm TD BHA# 62.5 12,595.0 03:39 05:54 21 with a 0.6° ako motor and no res tool. 8/2912017 8129/2017 0.15 PROD2 DRILL DLOG T Lag K1 marker correction of plus 5.5' 12,595.0 12,621.0 05:54 06:03 8/29/2017 8/292017 1.00 PROD2 DRILL TRIP T Continue RIH 12,621.0 14,882.6- 06:03 07:03 8/29/2017 8/29/2017 0.50 PROD2 DRILL CIRC P Confirm TD, line up and pump liner 14,882.0 14,882.0 07:03 07:33 pill, jogging pipe dose to bottom . 8/29/2017 8/29/2017 3.00 PROD2 DRILL TRIP P POOH while laying in 12.0 ppg liner 14,882.0 62.2 07:33 10:33 running pill with alpine beads, PUW 44 k, painting EOP flags 8/29/2017 8/29/2017 0.50 PROD2 DRILL OWFF P At surface, check well for flow (no- 62.2 62.2 10:33 11:03 flow), PJSM 8/29/2017 8/29/2017 0.50 PROD2 DRILL PULD P LD cleanout/confirm TD BHA# 21 on a 62.2 0.0 11:03 11:33 dead well 8/29/2017 8/29/2017 0.25 COMPZ2 CASING PUTS P Prep rig floor for PU liner assembly, 0.0 0.0 11:33 11:48 PJSM 8/29/2017 8/29/2017 3.25 COMPZ2 CASING PULD P MU AL1 Liner assembly, check BHI 0.0 1,710.5 11:48 15:03 check valves and pac-offs 8/292017 8/292017 0.75 COMP72 CASING PULD P PU/MU BHI CoilTrak tools, surface 1,710.5 1,776.3 15:03 15:48 test tools (good test) 8/292017 8/29/2017 2.40 COMM CASING RUNL P RIH, with AL1 liner assmebly BHA# 22 1,776.3 12,573.0 15:48 18:12 8/292017 8/29/2017 0.90 COMPZ2 CASING RUNL P Wt Check 43 k lbs, tie into window flag 12,573.0 14,597.0 18:12 19:06 for 2.42' correction. continue to RIH. SD @ 14,597', PU 52 k lbs, -10.9 k WOB, continue to RIH. 8/292017 8/29/2017 0.10 COMPZ2 CASING RUNL P tie into flag while driving by for no 14,597.0 14,882.0 19:06 19:12 corection. SD @ 14883', stacked - 1 Ok CT wt 2.6 k WOB 2.78k lbs. stage pump up to 1.5 bpm, CT 4321 psi. PU,Ct wt broke over at 38k lbs, WOB-3.471k lbs. Released linecbottom 14882' TOB 13150. 8/29/2017 8/29/2017 1.90 COMM CASING TRIP P Reset counters, POOH replacing pipe 14,882.0 70.0 19:12 21:06 voydage w KW. Open EDC once in caseed hole. continue to POOH. 8/29/2017 8/29/2017 0.70 COMPZ2 CASING PULD P PJSM, at surface, flow check - Good, 70.0 0.0 21:06 21:48 unstab injector, Examine pipe, flat spot -24' back 0.13", @ - 17' back 0.90". Decision made to cut pipe / rehead. LD BHA # 22 over a dead well. Page 23161 Report Printed: 912712017 - Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start DepN I Start Time End Tim our(hn Plass Op Code Activity Code Time RT -X Operation M) End Depth(ftKe) 8/29/2017 8/30/2017 2.20 COMPZ2 CASING CTOP P Cut 30' of pipe and rehead, pull lest to 0.0 0.0 21:48 00:00 38k lbs - good, install upper Quick, PT to 4k psi - good. 8/30/2017 8/30/2017 1.20 PRODS STK PULD P PJSM, PU and deploy BHA #23, AL2 0.0 70.0 00:00 01:12 let drilling assembly, over a dead well. Stab injector, bump up, set counters 8/30/2017 8/30/2017 2.60 PROD3 STK TRIP P RIH, shallow test agitator, came on 70.0 12,595.0 01:12 03:48 above 1 bpm, open EDC, continue to RIH. Baker drilling screen jumped from - 7000 feet to 13,000 feet for no known reason. MWD cycled equipment and reset depths. 8/3012017 8/30/2017 0.20 PRODS STK DLOG P Tie into K1 for+4' correction 12,595.0 12,633.0 03:48 04:00 8/30/2017 8/30/2017 1.25 PRODS STK DISP P Pull above TOC, open EDC, circ out 12,633.0 12,633.0 04:00 05:15 12.0 kill weight fluid. 8/30/2017 8/30/2017 0.25 PRODS STK TRIP P RIH, dry tag TOB at 13,150', PUH, 12,633.0 13;150.0 05:15 05:30 PUW 37 k 8/30/2017 8/30/2017 2.50 PRODS STK KOST P Bring pump on 1.81 bpm at 5,215 psi, 13,150.0 13,157.0 05:30 08:00 BHP 3,966, WHIP 8, IA 0, OA 334, CTSW=12 k, DHWOB=0.4 k, kickoff billet as per RP, Dry drift billet area _ clean 8/30/2017 8/30/2017 4.50 PRODS DRILL DRLG P Drilling ahead, 1.8 bpm at 5,565 psi, 13,157.0 13,484.0 08:00 12:30 BHP 3,988, WHP 0, IA 0, OA 417, CTSW=7 k, DHWOB=2.6 k, ROP=80- 120 fph 8130/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper up hole to 12,750', PUW 50 k 13,484.0 12,750.0 12:30 13:00 8130/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper back in hole, RIW 7 k 12,750.0 13,484,0 13:00 13:30 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P BOBD 1.8 bpm at 5,235 psi FS, BHP 13,484.0 13,700.0 13:30 16:30 3,959. WHP 0, IA 0, OA 454, CTSW=3.6 k, DHWOB=2.6 k, ROP=40 fph 8/30/2017 8/30/2017 1.50 PRODS DRILL DRLG P OBD 1.8 bpm at 5,377 psi, BPH 13,700.0 13,795.0 16:30 18:00 4,043, WHP 0, IA 0, OA 485, CTSW=7 " k, DHWOB=1.g k, ROP=33 fph 8/30/2017 8/30/2017 2.20 PRODS DRILL DRLG P OBD stall, PU W152 k ran iton 13,795.0 13,875.0 18:00 20:12 something hard, ROP down to - 3 ft/hr, low diff, WOB - 3 k lbs, 13811' started to drill off, getting diff presure back. ROP increased after 13,814', caught bottoms up sample, lots of siderite 8/30/2017 8/3012017 0.30 PRODS DRILL WPRT P PU Wt 43 k lbs, Geo wiper, believe we 13,875.0 13,660.0 20:12 20:30 crossed fault, 8/30/2017 8/30/2017 0.30 PRODS DRILL WPRT P RBIH, SID 13,810', short PU clean, 13,660.0 13,875.0 20:30 20:48 rolled toolface to as drilled- 310 ROHS, SD again 13,816', 3 k lbs, short Pu clean, RBIH still 330°ROHS, reduced rate to 0.3 BPM, slid right through. Page 24151 Report Printed: 9127/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log - StmlDepth Start Time I End Time Our (ho phase Op Code Ad iviity Code Time P -T -X Operation (MB) EM Depth (HKB) 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P 1.79 bpm in, 1.70 bpm out, Ct 5350 13,876.0 13,971.0 20:48 23:48 psi, free spin diff 1000 psi, CT RIH wt 9k. OBD, WOB 1.5 k lbs, CT wt 6.5 k lbs, ROP 30 ft/hr. Pumped 5 x 5 sweep pre wiper tirp CT wt -2.9 k lbs, 1 k lbs WOB, ROP 45 ft/hr 8/30/2017 8/31/2017 0.20 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2-770' 13,971.0 13,512.0 23:48 00:00 chasing sweeps uphole. 8/31/2017 8/31/2017 0.10 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper#2 - 770' 13,512.0 13,200.0 00:00 00:06 chasing sweeps uphole. 8/31/2017 8/31/2017 0.30 PRODS DRILL WPRT P RBIH, RIH Wt 7 k lbs, RIH Wt 8 k 13,200.0 13,971.0 00:06 00:24 8/31/2017 8/31/2017 3.80 PRODS DRILL DRLG P 1.81 bpm in, 1.72 bpm out, Ct 5480 13,971.0 14,078.0 00:24 04:12 psi, free spin diff 1010 psi OBD, CT wt 4 k lbs, WOB 2 k lbs. ROP 58 ft/hr. Excess surface weight short lived. CT weight fell to -3 k lbs w 2 k WOB in 20 min, ROP 30-15 fU hr 8/31/2017 8/31/2017 0.20 PRODS DRILL WPRT P PU Wt 42 k lbs, Wipe 100' 14,078.0 14,078.0 0412 04:24 8/31/2017 8/31/2017 2.00 PRODS DRILL DRLG P 1.82 bpm in, 1.78 bpm out, CT wt 6 k 14,078.0 14,111.0 04:24 06:24 lbs, WOB 1.8 k lbs. CT weight fell quicly to 4 klbs. ROP —16 ft/hr 8/31/2017 8/31/2017 0.15 PRODS DRILL WPRT P BHA wiper PUW 47k 14,111.0 14,111.0 06:24 06:33 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P BOBD, 1.8 bpm at 4,886 psi, BHP 14,111.0 14,189.0 06:33 10:48 4,093, WHP 0, IA 0, OA 567, CTSW= minus 5 k, DHWOS=1.8 k, ROP 15 fph, start new mud down coil 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,950 psi, BHP 14,189.0 14,280.0 10:48 15:03 3,965, WHP 0, IA 0, OA 568, CTSW= minus 5.9 k, DHWOB=1.3 k, ROP 15- 28 fph "" New mud at the bit 14,189' 8/31/2017 8/31/2017 0.75 PRODS DRILL WPRT P Wiper up hole for tie in. PUW 45 k, 14,280.0 12,595.0 15:03 15:48 14,100' pull heavy 73 k 8/31/2017 8/31/2017 0.15 PRODS DRILL DLOG P Log the K1 correction of plus 7.5', seat 12,595.0 12,626.0 15:48 15:57 pump 8/31/2017 8/31/2017 1.00 PRODS DRILL WPRT . P RBIH, Work through tight area @ 12,626.0 14,270.0 15:57 16:57 14,100 8/3112017 8/31/2017 0.70 PRODS DRILL WPRT T PU to clean up tight section. Stuck 14,270.0 12,691.0 16:57 17:39 multiple times 14,100 - 14,000'. Stack negative down, Pull 75 fl/min, up to 78k surface. weight, 44 k was clean pickup. Able to pull free. Pump multiple 5x5 sweeps. Weights clenaed up above the fault @ 13,800. Page 25151 ReportPrinted: 9127!2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR 3 -AC Job: DRILLING SIDETRACK Time Log and Depth start Time End Imre Our (hr) Phase Op Code Activity Code rime P-T.X Operation (MO) End Depth UMS) 8/31/2017 8/3112017 1.00 PRODS DRILL CIRC T Open EDC, pumping 1.84 bpm, as the 12,691.0 12,670.0 17:39 18:39 bottoms up landed from when we war stuck large amounts of cuttings returned to the shaker. No rocks, all fines. All twenty valleys on the shaker full to the top. Sweeps landed and solids returns were greatly deminished from previous. Pump two more sweeps timed out for clean out run. PU W144 k lbs. Close EDC 8/31/2017 8/31/2017 0.40 PRODS DRILL WPRT T RBIH, 12,670.0 13,807.0 18:39 19:03 8/31/2017 8/31/2017 2.50 PRODS DRILL WPRT T Pu Wt 45k lbs, Pull out of hole wiping 13,807.0 78.0 19'.03 21:33 to the window chasing sweeps to surface. Open EDC. Contiue out of hole chasing sweeps. Called our - Baker tool hand w billet and open hole anchors 8/31/2017 8/31/2017 1.50 PRODS DRILL PULD T Bump up, PUD BHA#23. 78.0 0.0 21:33 23:03 8/31/2017 9/1/2017 0.95 PRODS STK PULD T PU & PD BHA#24 0.0 78.0 23:03 00:00 9/1/2017 9/1/2017 1.50 PRODS STK PULD T Crew Change, PJSM, contiune to PU 0.0 78.0 00:00 01:30 & PD BHA #24 911/2017 9/1/2017 2.90 PRODS STK TRIP T Bump up, set counters, RIH w 78.0 12,610.0 01:30 04:24 anchored billet. 9/1/2017 9/1/2017 0.20 PRODS STK DLOG T Tie into the K1 for+6' correction 12,607.0 12,633.0 04:24 04:36 9/1/2017 9/1/2017 0.70 PRODS STK TRIP T Pu Wt 42 k lbs, SID pumps, close 12,633.0 13,347.0 04:36 05:18 EDC. Continue to RIH, SID multiple times 13,272', 3k Itis bounced through 13,329', 3k lbs bounced through 13,347', 4.6 k PU Wt 44 k 20-25 ft/min 13,347', 4.8 k PU Wt 48 k 13,347', 4 k PU Wt 50 k Orient slip to as drilled, 240° ROHS SID 13,345'3k PU Wt 48k 9/1/2017 9/112017 0.40 PRODS STK TRIP T PUH, 13,347.0 12,669.0 05:18 05:42 9/1/2017 9/1/2017 0.75 PRODS STK WAIT T Open EDC, maintain bottom hole 12,669.0 12,562.0 05:42 06:27 pressure. while creeping up hole, wait on orders for new setfimg depth 9/1/2017 9/112017 0.35 PRODS STK TRIP T Close EDC, RIH notice counters not 12,562.0 12,562.0 06:27 06:48 working, RIH for tie in 9/1/2017 911/2017 0.25 PRODS STK DLOG T Log the Kt correction of plus 36.5' 12,562.0 12,642.0 06:48 07:03 9/1/2017 9/1/2017 0.50 PRODS STK WAIT T Confer with town team on billet setting 12,642.0 12,642.0 07:03 07:33 depth 9/1/2017 9/1/2017 3.25 PRODS STK TRIP T POOH, for cleanout run, @ 500' PJSM 12,642.0 73.3 07:33 10:48 for PUD Billet BHA# 24 9/1/2017 9/112017 1.25 PRODS STK PULD T PUD, Billet BHA# 24 73.3 0.0 10:48 12:03 9/12017 9/1/2017 0.75 PROD3 DRILL WAIT T Wait on Concretion Bit via/KDTH 0.0 0.0 12:03 12:48 9/1/2017 9/1/2017 1.25 PRODS DRILL PULD T PJSM, PD cleanout/drill BHA# 25 0.0 78.2 12:48 14:03 Page 26151 Report Printed: 9/2712017 A Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time EM Time Dur" Phase Op code Activity Cone Time P -T -X Operation (RKB) EM Depth (ftKB) 9/1/2017 9/1/2017 2.50 PROD3 DRILL TRIP T RIH, w/cleanout BHA#24 78.2 12,600.0 14:03 16:33 9/1/2017 9/1/2017 0.20 PROD3 DRILL DLOG T Tie into the K1 for a +5.5' correction 12,600.0 12,630.0 16:33 16:45 9/1/2017 9/1/2017 0.40 PRODS DRILL TRIP T Wt Ck 40 k lbs, coninue to RIH 12,630.0 13,300.0 16:45 17:09 9/1/2017 911/2017 0.70 PRODS DRILL REAM T 1.80 bpm, Ct 4800 psi, free spin diff 13,300.0 13,819.0 17:09 17:51 830 psi. SID @ 13,819'stack weight w motor work. PU 43 k lbs, sticky, started 5x5 sweep. RBIH 9/1/2017 9/1/2017 0.20 PRODS DRILL REAM T 1.80 bpm, CT 4861, psi, free spin 819 13,819.0 13,700.0 17:51 18:03 psi, RIH wt 10 k Ibs Tag up 13,813', work at 3 ft/min to 13,828' PU 40k lbs, some neg WOB, motor work Crew change 9/12017 9/1/2017 1.60 PRODS DRILL REAM T RBIH SID @ 13,814 drilled off, 13,700.0 13,837.0 18:03 19:39 continue to RIH, pumping 5x5 sweeps one in as one exits the n=le. Drill to 13,830'3+ k WOB, PU 47k wipe to above the fault, lots of silt at the shaker RBIH, SID at 13,814 work past, 13,834' hard bottom +3 k WOB, Work slowly to 13,837, +3k WOB, PU 58 k, wipe to above fault, RBIH Consult w/ town. Scope change to prep for billeUopen hole side track 9/1/2017 9/1/2017 0.60 PROD3 DRILL VJPRT T PU 47k, PUH as 5x5 sweep exiting 13,837.0 12,550.0 19:39 20:15 the n=le, to above TOC, questions re. TOC in tubing, under reamed from 12,559' up ( tagged w underreamer @ 12,569') and drilled pilot hole from 12,588 down. Open EDC, 9/1/2017 9/1/2017 0.90 PRODS DRILL CIRC T Increase rate to 2.22 bpm, watch two 12,550.0 12,606.0 20:15 21:09 sweeps land on the shaker, solids greatly reduced on the second. Loaded another 5x5 sweep in the coil _ and closed EDC 9/1/2017 9/1/2017 0.20 PROD3 DRILL DLOG T Log K1 for+5.5' correction 12,606.0 12,628.0 21:09 21:21 9/1/2017 9/12017 0.20 PROD3 DRILL WPRT T RIH pumping sweeps. 12,628.0 13,700.0 21:21 21:33 9/1/2017 9/1/2017 0.80 PROD3 DRILL WPRT T Pu Wt 39 k IDS, PUH slowly timing out 13,700.0 12,550.0. 21:33 22:21 sweeps. continue to POOH chasing sweeps to surface. Saw slight/brief motor work @ 12,780' just below the window, RBIH, PUH, clean. Park and open EDC. 9/1/2017 9/2/2017 1.65 PROD3 DRILL WPRT T Continue to POOH pumping 2.27 bpm 12,550.0 3,400.0 22:21 00:00 9/2/2017 9/2/2017 0.80 PRODS DRILL WPRT T Continue to POOH pumping 2.27 bpm 3,400.0 83.0 00:00 00:48 9/2/2017 9/22017 1.30 PRODS DRILL PULD T Tag up, space out, PJSM, PUD & LD 83.0 0.0 00:48 02:06 BHA#25. 9/22017 9/2/2017 1.30 PRODS STK PULD T PU & PD BHA # 26, anchored billet, 0.0 83.0 02:06 03:24 check pack offs - replace. Page 27151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log m De Start Depth Shia Time S End Time our (hr) Phase OD Code Activity Coda Time P -T -X Operation End Depth (flKB) 9/2/2017 9/2/2017 2.45 PRODS STK TRIP T RIH 83.0 12,610.0 03:24 05:51 9/2/2017 9/212017 0.15 PRODS STK DLOG T Log the K1 correction plus 9 R 12,610.0 12,624.0 05:51 06:00 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Continue RIH 12,624.0 13,374.0 06:00 06:15 9/2/2017 9/2/2017 0.25 PRODS STK TRIP - T Small bobble @ 13,347', set down 3 13,374.0 13,374.0 06:15 06:30 limes, setting down 4 k=DHWOB, PUW=48 k, 9/2/2017 9/2/2017 0.50 PRODS STK WAIT T Call Town Engineer, for plan forward. 13,374.0 13,498.0 06:30 07:00 decision was made to attempt to push past ledge/debris in hole, set down 4.7 k, PUW=52, RBIH @ 40 fpm, popped thru, continue RIH' 9/2/2017 9/2/2017 1.00 PRODS STK TRIP T Continue RIH, set down 4.7 k, 13,498.0 13,498.0 07:00 08:00 PUW=52 k, try and work billet down 13 times, setting down 4-6 k, max PUW= 60 k (sticky), max set down weight 6.5 k DHWOB, AP=dropping to 3,342 psi, bring annular pressure back up to MP 4,058 psi with no success in gelling past 13,498' 9/2/2017 9/2/2017 0.25 PRODS STK WPST T Call Town Engineer, plan forward set 13,498.0 13,475.0 08:00 08:15 Estimated TOB at 13,475', Anchor set @ 30 ROHS. Bring pump up to 4,241 psi, tool shifted showing 1.7 k DHWOB, set down additional 1.5 k, PUW=47 k 9/2/2017 9/2/2017 2.50 PRODS STK WPST T POOH, pumping 1.0 bpm at 2773 psi, 13,475.0 73.3 08:15 10:45 filling in trip sheet, PJSM @ 750' from surface 9/2/2017 9/2/2017 1.15 PRODS STK PULD T Tag up at surface, space out, PUD & 73.3 0.0 10:45 11:54 LD BOT Setting tools 9/2/2017 9/2/2017 1.25 PRODS STK PULD T PD kickoff/drilling BHA# 27 0.0 78.3 11:54 13:09 9/2/2017 9/2/2017 0.50 PRODS STK SVRG P PJSM, w/crew and Hydra -Rig rep, 78.3 78.3 13:09 13:39 measuring goose neck A - frame..... When stabbed on to stump. 9/2/2017 9/2/2017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH following 78.3 12,610.0 13:39 15:39 MP schedule, filling trip sheet every 1000', test agitator at 308', (working) 9/2/2017 9/2/2017 0.25 PRODS STK DLOG T Log the K1 marker correction of plus 12,610.0 12,620.0 15:39 15:54 4.5', PUW=40 k 9/2/2017 9/2/2017 0.35 PRODS STK TRIP T Continue RIH, RIW=13 k 12,620.0 13,480.0 15:54 16:15 9/2/2017 912/2017 2.00 PRODS STK KOST T Dry tag TOB, bring pump up to 1.8 13,460.0 13,483.0 16:15 18:15 bpm at 5,238 psi FS, BHP 3,968, WHIP 0, IA 0, OA 253 9/2/2017 9/212017 0.90 PRODS STK KOST T 1.80 bpm, targeting 0.5-1k WOB, 13,483.0 13,495.0 18:15 19:09 @ 13,483' ROP 3 ft/hr, WOB -.66k be @ 13,485' increased ROP to 5.5 it/hr - WOB 0.8 k lbs @ 13,486 increased ROP to 12 ft/hr- WOB 0.3 k lbs @13,487' chasing it, 15 ft/min, WOB 1 k lbs Page 28161 Report Printed: 9127120171 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log scan oepm Stan Time End Time our (hr) Phase op Coda Activity Code Time P -TA opemoon (ftKa) Ertl oepm (dKa) 912/2017 9/2/2017 0.40 PRODS STK TRIP T Drilling ahead, 130-30 Whir, lost depth 13,495.0 13,508.0 19:09 19:33 tracking. '• Note WOB started falling off at 19:19 right when the depth counter spears to have failed. 9/2/2017 9/2/2017 1.10 PROD3 STK TRIP T PU 38k lbs, mechanical @ 13,444', 13,508.0 12,734.0 19:33 20:39 jog slowly in 10 fool interval. Effect repair and pull slowly up hole, reduce pump rate "best guess' where we think TOB is. Bring rate back up continue up hole logging to RA tag. See pip tag on the drive by 9/2/2017 9/22017 0.20 PROD3 STK DLOG T RBIH log RA tag for +7' correction 12,734.0 12,753.0 20:39 20:51 9/2/2017 9/2/2017 0.20 PROD3 STK TRIP T RIH, 12,753.0 13,497.0 20:51 21:03 9/2/2017 9/22017 0.40 PROD3 STK DLOG T SID @ 13,497, PU, RBIH, bounce 13,497.0 13,598.0 21:03 21:27 through. Continue to RIH logging from 13,508 down. Drive past suspect bottom, park at 13,532' survey- suspect in original hole. reduce pumps to min rate attempt to tag bottom. Survey @ 13,564' same results, in old hole Tum around at 13,598- 912/2017 9/2/2017 1.20 PRODS STK WPRT T Pump 5x5 sweep, PU, POOH toward 13,598.0 12,544.0 21:27 22:39 the window wiping hole. Pump another 5x5 sweep Make 2 up down passes, LS on up, HS on down from 13,430 - 13,300' in attempt to clean up the previous trouble spot. Continue to POOH. 9/2/2017 9/3/2017 1.35 PROD3 STK WPRT T Open EDC, POOH pumping 2.2 bpm 12,544.0 4,693.0 22:39 00:00 chasing sweeps. 9/3/2017 9/3/2017 1.30 PROD3 STK WPRT T Continue to POOH. Packed off the 4,693.0 78.0 00:00 01:18 MM while tripping, bypass same and contiue out of hole. Jog near surtace. 9/3/2077 9/3/2017 1.50 PROD3 STK PULD T Bump up, space out, PUD, 78.0 0.0 01:18 02:48 ***Bit had 7 of 10 total side ( reaming ) cutters severely damaged "`Bit graded 1-7 9/3/2017 9/32017 1.50 PROD3 STK PULD T PU and PD BHA # 28, Aluminum billet 0.0 73.0 02:48 04:18 w open hole anchors, bump up, set counters, pumps on at min rate, 9/3/2017 9/3/2017 2.50 PRODS STK TRIP T RIH, close EDC, comiue to RIH 73.0 12,610.0 04:18 06:48 9/3/2017 9/3/2017 0.20 PRODS STK DLOG T Tie into K1 for plus 4.0' Correction, 12,610.0 12,632.0 06:48 07:00 PUW 42 k 9/3/2017 9/3/2017 0.50 PROD3 STK TRIP T Continue IH 12,632.0 13,426.0 07:00 07:30 9/3/2017 9/32017 0.25 PROD3 STK WPST T At depth, PUW=43 k, RBIH to 13,426.0 13,415.0 07:30 07:45 13426.8' PUH 39 k, bring pump online 0.45 bpm, tool sheared at 4,800 psi, 9/3/2017 9/3/2017 2.15 PROD3 STK TRIP T POOH, PJSM @ 750' from surface 13,415.0 61.2 07:45 09:54 Page 29151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time EM TMs gw(hr) Phase Op Code AcWo Cods Time P -T -X Operation (Po(e) End Depth (WB) 9/3/2017 9/3/2017 0.80 PRODS STK PULD T PUD BOT setting tools 61.2 0.0 09:54 10:42 9/3/2017 9/3/2017 0.25 PRODS STK PULD T LD BOT tools 0.0 0.0 10:42 10:57 9/3/2017 9/3/2017 1.00 PROD3 STK PULD T PU/MU AL2 kickoff/drilling BHA, 0.0 78.3 10:57 11:57 surface test tools (good -lest) 9/3/2017 9/3/2017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH w/AL2 78.3 12,610.0 11:57 13:57 kickoff/driliing BHA# 29 9/3/2017 9/3/2017 0.15 PRODS STK DLOG T Log K1 marker correction of plus 4.0' 12,610.0 12,716.0 13:57 14:06 9/3/2017 9/3/2017 0.50 PROD3 STK TRIP T Continue IH 12,716.0 13,415.0 14:06 14:36 9/3/2017 9/3/2017 2.00 PRODS STK KOST T Dry lag TOB, PUW 40 k, bring pump 13,415.0 13,425.0 14:36 16:36 on-line 1.8 bpm at 5,124 psi, BHP 3,934, WHP 0, IA 0, OA 275, CTSW=11.3 k, DHWOB=0.15 k, Kickoff Billet as per RP, 20°ROHS 9/3/2017 9/3/2017 2.00 PRODS DRILL DRLG T Start drilling formation 1.8 bpm at 13,425.0 13,750.0 16:36 18:36 5,719 psi, BHP 3,932, WHP 0, IA 0, OA 386, CTSW=8 k, DHWOB=1.6 k, ROP 67 fph Stalled, PU and dry drifted billet clean PU @ 13,537'to get restarted, 43 K lbs BOBD 130-155 ft/hr, Pump 5x5 @ 13,672' drilling @ 150 fl/hr, Cl Wt Ok lbs, 1.73 k Ibis Sweeps start exiting the nozzle @ 13,746', staged a 10 bbl Hi vis sweep in the coil to time out below the window. 9/3/2017 9/3/2017 1.70 PRODS DRILL WPRT T Pu, Wt 44 klbs 13,750.0 13,360.0 18:36 20:18 PUH chasing sweeps. Pull 50 k Itis @ 13,460, turn around, SID, PU, pump min rate, RBIH, S/D, PU, RBIH Bounce through, continue in hole 13,650, PU Wt, 44 k PUH @ 30 ft/min pumping 1.8 bpm, sweeps exit at 13,480'. Small neg WOB @ 13460'. turn around 13,438' RBIH @ 1.0 bpm. saw a little WOB spike at 13,4683, other than that clean PU 43k, PUH, saw a little neg WOB again @ 13,460' Pulled past billet, 44 k clean, saw 48 k CT wt as we drug by with a -1 k WOB spike. 9/3/2017 9/3/2017 2.50 PRODS DRILL TRIP T Continue to POOH. 13,360.0 74.0 20:18 22:48 Open EDC above TOC, increase pump rate from 1.8 to 2.2 bpm Continue to POOH 9/3/2017 9/4/2017 1.20 PRODS DRILL PULD T Bump up, space out, PUD BHA #29, 74.0 0.0 22:48 00:00 UD same 9/4/2017 9/4/2017 0.40 PRODS DRILL PULD T Continue to lay down BHA #29 0.0 - 0.0 00:00 00:24 Page 30/51 Report Printed: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth star Time End TMe our (hr) Phase Op Code FcM, Cade Time P -T -x Opetakm (flKB) End Depth(flKB) 9142017 9/4/2017 3.60 PRODS DRILL RURD P Prep to test BOPS 0.0 0.0 00:24 04:00 PU nozzle, stab injector, jet stack, (rolling coil to fresh water while jetting stack). Un Stab injector, central shops grease tree valves, Nabors crew grease stack. and/choke valves, Test inner reel iron low I high good. install night cap, 9/4/2017 9/4/2017 2.00 FROM WHDBOP BOPE P PJSM, Flood up BOP stack, Start test 0.0 0.0 04:00 06:00 @ ( 4:00 ) Witness of test by AOGCC - Bob Nobel. 250 psi low / 4200 psi High. test #1 Swab 2, - pass Test #2 Lower Blind shear, TV2 - pass Test #3 BOP TVI - Test #4 Upper blind shear, B1,&5 C4,5,8,&12, R1, bleeder 1 Test#5 C3,6,7,&11,82&6, T2 9/42017 9/4/2017 8.00 PRODS WHDBOP BOPE P Crew change, PJSM, contiue BOP 0.0 0.0 06:00 14:00 testing, sim-ops - replace coupler on motor #1, right angle drive motors on INJH, "` BOP test Complete 14:00 (10 him TT), 2 fail/pass, R3 grease and function (retest good) and Koomey # 1 accumulator pump failed, changed out contactor, (retest good) 9/4/2017 9/4/2017 0.65 FROM DRILL DISP P Stab INJH onto stump, circulate coil to 0.0 0.0 14:00 14:39 drilling fluid.Unstab INJH, move cart back 9/4/2017 9/42017 1.75 PRODS DRILL PULD T PU/PD pre -loaded BHA# 30 0.0 78.3 14:39 16:24 914/2017 9/4/2017 0.25 PRODS DRILL PULD T Stab INJH, surface test Coillrak tools 78.3 78.3 16:24 16:39 (good -test), tag up, zero counters 9/4/2017 9/42017 2.00 PRODS DRILL TRIP T RIH, w/ AL2 drilling BHA# 30 78.3 12,595.0 16:39 18:39 w/agitator and RR bi-center bit 9/4/2017 9/4/2017 0.15 PROD3 DRILL DLOG T Log the Kt marker correction of plus 12,595.0 12,632.0 18:39 18:48 8.5' 9/4/2017 9/4/2017 0.25 PRODS DRILL TRIP T Continue IH 12,632.0 13,750.0 18:48 19:03 9/4/2017 9/4/2017 1.50 PRODS DRILL DRLG T OBD, 1.8 bpm at 4,875 psi FS, BHP 13,750.0 13,862.0 19:03 20:33 3,996, WHP 0, IA 0, OA 364, CTSW=9 k, DHWOB=1.7 k, ROP 69 fph 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T BHA wiper, PUW 44 k 13,862.0 13,862.0 20:33 20:42 9/4/2017 9/4/2017 2.00 PRODS DRILL DRLG T BOBD, 1.75 bpm at 4,888 psi FS, 13,862.0 13,976.0 20:42 22:42 BHP 9,994, WHIP 0, IA 0, OA 365, CTSW=1.5 k, DHWOB=1.4 k, ROP 50 -69 fph, pump 5x5 sweep 9/42017 9/4/2017 0.25 PRODS DRILL WPRT T Sweep at bit, wiper up hole, PUW 44 k 13,976.0 13,750.0 22:42 22:57 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T Wiper back IH, RIW 10 k 13,750.0 . 13,976.0 22:57 23:06 9/4/2017 9/5/2017 0.90 PRODS DRILL DRLG T BOBD, 1.75 bpm at 4,797 psi FS, 13,976.0 14,053.0 23:06 00:00 BHP 3,996, WHP 0, IA 0. OA 371, CTSW=minus 2k, DHWOB=1.7 k, ROP=50 fph Page 31151 Report Printed: 9/2712017 Operations Summary (with Timelog IJepths) is 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SWa Depth Start Time End Time our (no Phase Op Cade Aatiwdy case Time P -T -x Operation (ftKB) End Depth(ftKB) 9/5/2017 9/5/2017 1.40 PRODS DRILL DRLG T OBD 1.75 bpm Ct 5000 psi, BHP 14,053.0 14,150.0 00:00 01:24 3,996, WHIP 0, IA 0. OA 402, CT Wt -3 k f lbs, WOB 1 k IbsROP 70 /hr BHA wiper at 14,072'- PU 43 K lbs BHA wiper at 14,091'- PU 45 K lbs - sent 5x5 low/hi sweep average ROP over interval drilled 70 It/hr 9/512017 9/5/2017 0.40 PROD3 DRILL WPRT T Wiper #2, 700' after sweeps exit the 14,150.0 13,450.0 01:24 01:48 bit - PU Wt 40k lbs 9/5/2017 9/5/2017 0.40 PROD3 DRILL WPRT T RBIH, Tight spot @ 13,850' 13,450.0 14,150.0 01:48 02:12 Swap from mud pump #2 to #1 to repair a packing leak 9/5/2017 9/5/2017 1.80 PRODS DRILL DRLG T 1.77 bpm, off bottom CT 4795 psi, diff 14,150.0 14,270.0 02:12. 04:00 944 psi, Ct RIH Wt 10 k lbs OBD, Ct wt, 8 k lbs, WOB 1.5 k lbs, ROP 70 Po hr Drilled into something hard —14,165'3 K WOB, ROP 30 ft/hr PU & restart @ 14,165', 42 k lbs Broke through @ 14,170'- ROP 170 fU hr WOB 1.5-2 k - short lived, settled in at 100 ft/hr @ 14,199' diff fell off, PU 46 k lbs - RBIH, send 5x5 BHA wiper 100'@ 14,249' PU 43 k lbs BOBD up to 130 Whir w neutral coil weight and 600 lbs WOB Average ROP 67 ft/hr Losses crept up to — 0.1 bpm 9/5/2017 9/5/2017 2.50 PROD3 DRILL DRLG P OBD, Cl wt, 2.5 k lbs, WOB 1 k lbs, 14,270.0 14,432.0 04:00 06:30 ROP 70 fU hr PU and restart @ 14,333' PU Wt 43k PU and restart @ 14,35' PU Wt 47k - pump 5x5 Average ROP 65 fi/hr 9/5/2017 9/5/2017 2.20- PRODS DRILL DRLG P OBD, Ct wt, -5 k lbs, WOB 1.0 - 0.5 k 14,432.0 14,543.0 06:30 08:42 lbs, ROP 120 - 30 it/ hr on something hard, 14,511' pump 5x5 in anticipation of a wiper trip Averag ROP 50 ft/hr 9/5/2017 915/2017 0.80 PRODS DRILL WPRT P Wiper #3 after sweeps exit the bit-'PU 14,543.0 12,610.0 08:42 09:30 Wt 43k Ibis -1933' Saw some motor work below the window @ 12,880' 9/5/2017 9/5/2017 0.10 PRODS DRILL DLOG P RBIH, tie into Kt for +3.5 conection 12,610.0 12,633.0 09:30 09:36 9/5/2017 9/5/2017 0.80 PRODS DRILL WPRT P RBIH 12,633.0 14,543.0 09:36 10:24 WOB bobble @ 13,867', SIC) @ 13,914' bounced through Page 32151 Report Printed: 9/27120171 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slant Depen StartTime End Time DurM Phase Op Code Aclivfty Code Tnro P-T-X Operation MM) End Dept IWO) 9/512017 9/5/2017 4.00 FROM DRILL DRLG P 1.83 bpm, Ct 5140 psi, diff 980 psi 14,543.0 14,649.0 10:24 14:24 RIH Wt 4 k lbs OBD, CtWt 3.5 k lbs, WOB 1.1 k, ROP 55 ft/hr PU Wt43 k lbs, Swap from Pump #1 to #2 RBIH CT Wt -5 k lbs, WOB 1.36 k lbs, ROP 43 ft/hr PU to get restarted @ 14,649', 45 k lbs not much change, pump 5x5 PU as sweep exited the nozzle, PU wt 43k, 9/5/2017 9/512017 1.80 PRODS DRILL DRLG P 1.70 bpm, free spin diff 855 psi 14,649.0 14,722.0 14:24 16:12 OBD, CtWt 4 to -5 k lbs, WOB 1 to 0.5 k, ROP 10 - 30 ft/hr Send sweeps, poor ROP and weight transfer PU to restart @ 14,707' , Pu Wt 46k 50 ft/hr while pill exiting then death spiral, PU Wt 50 klbs. 9/512017 9/5/2017 0.20 FROM DRILL WPRT P PU Wt, 47 k lbs - 300' short wiper 14,722.0 14,503.6- 16:12 16:24 RBIH 915/2017 9/5/2017 0.60 FROM DRILL WPRT P 1.70 bpm, Ct 4801 psi, free spin diff 14,503.0 14,722.0 16:24 17:00 860 psi, RIH Wt 3.3k BOBD, CtWt 5 k lbs, WOB 1 k, ROP 35 ft/hr, send 10 bbl beaded pill 9/5/2017 9/5/2017 2.50 PROD3 DRILL DRLG P Continue drilling ahead from 14,722', 14,722.0 14,795.0 17:00 19:30 performing BHA wipers as required, begin climbing to planned 94' Inclination to regain sand at 14745' (as per geology) 9/5/2017 9/5/2017 3.50 PROD3 DRILL DRLG P OBD at 14,795', CWT=-5K-2K, 14,795.0 14,876.0 19:30 23:00 WOB =1K,.1 bbl/min losses, pumping beaded pills as required, increase NBI to 96°, multiple BHA wipers to keep going, PUW from 14,&43'= 52K (averaging - 42K - 441<). Began sending 5x5 sweeps from 14,862' in prep for WT & mud swap after exiting lower At Silt, average ROP over interval = 23 fph 9/512017 9/5/2017 0.50 PRODS DRILL WPRT P Wiper up-hole, PUW =45K 14,876.0 13,450.0 23:00 23:30 9/5/2017 9/612017 0.50 FROM DRILL WPRT P Wiper in-hole, clean past 13,450.0 14,200.0 23:30 00:00 13,830' (Fault #1), three 2.5K set downs at —13,869'& —13,850', PUW = 42K, reduce rate to .2 bpm & get by, set down at 13,899', again reduce to min rate & get by, RIW at 14,190'= 9.4K 9/6/2017 9/612017 0.20 FROM DRILL WPRT P Continue WT in-hole 14,200.0 14,876.0 00:00 00:12 9/6/2017 9/612017 2.80 FROM DRILL DRLG P BOBD, FS = 930 psi, CWT = 1K, 14,876.0 14,933.0 00:12 03:00 WOB = 1 K, circ pressure = 5413 psi, rate in = 1.7 bpm, began pumping new mud (System #5), new mud at the bit at 14,906', PUW = 50K from 14,907', increase rate to 1.8 bpm, experience significant vibrations, reduce rate back dawn to 1.7 bmp Page 33151 Report Printed: 9/27/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TfYn® Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Cade inre P-T.X Operation M) End Deptlr (1tKe) 9/6/2017 9/6/2017 3.00 PRODS DRILL DRLG P Continue drilling from 14,933', rate in 14,933.0 15,018.0 03:00 06:00 = 1.7 bpm, FS = 950 psi, CWT = 5K, WOB = 1 K, continue snubbing coil, PUW = 48K from 14,941', attempt 1.5 bpm, continue to struggle with weight transfer, bring rate back up to 1.7 bpm, begin to lube up pill pit to 2% 776 (50 bbl). - 9/6/2017 9/6/2017 4.20 PRODS DRILL DRLG P OBD, pumped 20 bbls 2% lube pill. 15,018.0 15,118.0 06:00 10:12 Pre, coming of a BHA wiper, 1.83 bpm, CT 5135 psi, diff 990 psi, Ct Wt -2k, WOB 0.8 k ROP 27 ft/hr Post, all 20 bbls lube pill out Ct Wt -6, WOB 0.5 k, had to pick up. - little effect, built and pumped a 20 bbl 2% low torque sweep from active mud. WOB up to 2.8 k lbs with neg CT wt, first time we've broke 1 k WOB all morning. lube up active system to 2% low torque. 23 fU hr average 9/6/2017 9/6/2017 0.50 PRODS DRILL DRLG P Drilling break, ROB up to 110 fVhr 15,118.0 15,150.0 10:12 10:42 PU's dropped to 43 k lbs, able to easily turn around Weight transfer gradually deteriorated at 140 bbls away of the 20 bbl pill ROP averaged 64 ft/hr 9/6/2017 9/6/2017 0.40 PRODS DRILL WPRT P Wiper#2 PU W151 k - 1,450' 15,150.0 13,700.5- 10:42 11:06 14,35T to 14,200'a little motor work 13,863' motor work, -1.4 k WOB, pulled —50 k , 10 k over clean string weight 9/6/2017 9/6/2017 0.50 PROD3 DRILL WPRT P Wiper RBIH 13,700.0 15,150.0 11:06 11:36 13,860' WOB spike 13,875' S/D 3.3 k, PU, RBIH min rate slid through Stack weight 13,906 to 13,968 while RIH @ min rale 9/6/2017 9/6/2017 5.40 PRODS DRILL DRLG P BOBO. struggled to get to bottom, had 15,150.0 15,300.0 11:36 17:00 to reduce pumped rate and ramp up to drilling rate once on bottom. CT Wt -6k Itis, WOB 0.5 k ROP 20-70 ft/hr Struggling with weight transfer, build another 2% low torque pill, pump 20 bbls No change in weight transfer. Add beads to pill, pump with little benefit. Build 2 ppb beaded pills w active mud and pump as sweeps -10 bbls each. little benefit. 9/6/2017 9/6/2017 4.00 PRODS DRILL DRLG P OBD, trouble turning around below 15,300.0 15,376.0 17:00 21:00 15,110' Ct wt 0 to -8 k lbs, WOB, 0.3 to 1 k Its, ROP 15 -40 f thr. Pumping 10 bbl beaded pills as needed with little effect Page 34151 Report Printed: 9/27/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start ceph SIM Time End Time Oor(hd Phase Op Code AatiAy Code TM PJA Operation (MB) End DWh(MxB) 9/6/2017 9/7/2017 3.00 PRODS DRILL DRLG P Continue drilling from 15,376', CWT= 15,376.0 15,407.0 21:00 00:00 -5K, WOB -.9K, rate in = 1.7 bpm, experiencing low ROP - 10-20 fph; samples from 15,386'showing signs of clay, rig geo sent logs and confered with town geology,decision made to increase inclination to 96° and continue drilling ahead, looking for top of C4, gamma wrapping with bit depth of 15,436' 9/7/2017 9!7/2017 3.50 PRODS DRILL DRLG P Continue drilling ahead as per 15,407.0 15,440.0 00:00 03:30 geology, dimbing to 96° inclination, CWT = -5K, WOB = 1.5K, rate = 1.7 bpm, observed short ROP breakouts up to 115 fph, gamma begins to wrap at 15,405' (gamma tool depth) 9/7/2017 9/7/2017 0.40 PRODS DRILL DRLG P Contiue drilling ahead at 15,440', CWT 15,440.0 15,443.0 03:30 03:54 -4K, WOB = 1.8K, drilling through 150+ API formation, TD called at 15,433', PUW =47K 9/7/2017 917/2017 4.00 PRODS DRILL WPRT P Pump sweeps, circulate down coil, lay 15,443.0 83.0 03:54 07:64 -in beaded pill as per town request (50 bbl), perfrom swab WT. Saw a little motor work, - 1 k WOB and - 4k overpull on CT @ 13,844 9/7/2017 9/7/2017 1.70 PRODS DRILL WPRT P RBIH to confirm formation pressure, 83.0 12,610.0 07:54 09:36 TD, and flags 9f7/20.17 9/7/2017 0.30 PRODS DRILL DLOG P Tie in, drive by, PU 40 k lbs, RBIH, Tie 12,610.0 12,631.0 09:36 09:54 into K1 for+15' correction, Park at 12631.24 bit depth, Sensor depth 6114 TVD. Trap 3852 psi, watch it fall to 3715 psi ( baker annular pressure) calculated to 11.68 ppg and trending down. 9/7/2017 9/7/2017 0.50 PRODS DRILL WPRT P RBIH to confirm formation pressure, 12,631.0 13,903.0 09:54 10:24 TD, and flags set down 9/7/2017 9/712017 0.30 PRODS DRILL WPRT P PU and RBIH pumping min weight, 13,903.0 13,507.0 10:24 10:42 Work pipe to 14,100', PUH, pulling heavy, work pipe, squating and pulling out of hole at 75 ft/min, pulled up to 74k came free. pull up hole above the fault. CT weight 39 k lbs above the fault. 9/7/2017 9/7/2017 0.20 PRODS DRILL WPRT P RBIH, counter failed, did not notice for 13,507.0 13,661.0 10:42 10:54 3 minutes. 9/7/2017 9/7/2017 0.70 PRODS DRILL DLOG T Turn around, PU Wt 42 k PUH. 13,661.0 12,540.0 10:54 11:36 9/7/2017 9/7/2017 0.20 PRODS DRILL SVRG T Park and replace counter 12,540.0 12,540.0 11:36 11:48 9/7/2017 9/7/2017 0.20 PROD3 DRILL DLOG T RBIH, tie into K1 + 13' 12,540.0 12,629.0 11:46 12:00 9/7/2017 9/7/2017 0.30 PRODS DRILL WPRT T Continue to RIH, drop rate prior to 12,629.0 13,661.0 12:00 12:18 1 crossing billets and left it at 0.4 bpm. 9/7/2017 9/7/2017 0.60 PRO53 DRILL WPRT P Continue to RIH, see 2 WOB bobble 13,661.0 15,406.0 12:18 12:54 at 13,837 and 14,00'. Increase pump rate to 1.2 below trouble area 13,400. Stack coil weight @ 14,779' reduce rate to 0.7 bpm, contiune on in hole. Set down in hot gamma area, stack 2.25K WOB Page 35151 Report Printed: 912712 01 7 Operations Summary (with Timelog uepths) 3M-27 IL .. Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan DepM Sint Time End Time Ow (hr) Phase Op Code Ad ity Code Thne P-T-X Opeietiat (WO) End Depth (ftKB) 9/7/2017 9/7/2017 3.60 PRODS DRILL WPRT P PU, 49 k lbs 15,406.0 100.0 1254 16:30 Pump beaded liner running pill start PUH after letting - 6 bbls out the bit Paint Yellow EDP flag @ 14178.2 in tension Chase liner running pill w KW Pull through fault area, neg WOB spikes from 13,875-13,833'. Paint White window flag @ 10976.12' continue to POOH. 917/2017 9!7/2017 1.50 PRODS DRILL PULD P Al surface flow check - good, PJSM, 100.0 0.0 16:30 18:00 LD BHA #30. 9!7/2017 9/7/2017 2.40 COMPZ3 CASING PUTS P PJSM, PU AL2 Liner Run #1, (non- 0.0 1,653.0 18:00 20:24 ported bullnose, 31' pup, 4 jnts slotted liner, 2 tracer pups, 36 jnts slotted, & shorty deployment sleeve) 9/7/2017 9/7/2017 0.60 COMPZ3 CASING PULD P PU BHA #31, AL2 Liner Running 1,653.0 1,697.0 20:24 21:00 Tools (CoilTrack), slide in cart, stab on coil, bump up, set counters 9/7/2017 9/8/2017 3.00 COMPZ3 CASING RUNL P RIH with AL2 Liner Run #1, PUW = 1,697.0 13,844.0 21:00 00:00 42K at window, tie into window flag for +15' comection Stack weight at 13,600' - 13,844', work pipe, PUW's = 45K-50K, up to negativel OK WOB. 9/8/2017 9/8/2017 3.00 COMM CASING RUNL P Continue RIH with AL2 Liner Run #1, 13,844.0 14,400.0 00:00 03:00 stack weight from 13,844' through14,115', PUW's 45K-48K, working liner at various speed, significant time working past 14,124' & 14,345' (top of crest past Fault #1), 9/8/2017 9/8/2017 1.50 COMPZ3 CASING RUNL P Continue working AL2 liner Run #1 14,400.0 15,410.0 03:00 04:30 towards bottom, stacking reduced sigficantly from14,530', experience difficulty working liner past 15,073', park, circulate at .25 bpm, attempt again & get by, arrive at setting depth (bottom at 15,410'), bring up rate to 1.7 bpm, release off liner. 9/8/2017 9/8/2017 3.00 COMPZ3 CASING TRIP P POOH, paint EOP flags 15,410.0 71.0 04:30 07:30 13,314' (yellow), & 13,270' (white), tie into K1 for+5' correction 9/8/2017 9/8/2017 0.50 COMPZ3 CASING PULD P At surface, PJSM, flow check -good, 71.0 0.0 07:30 08:00 LD liner running asembly over a dead well, inspected pipe - -20' good. 9/8/2017 9/8/2017 1.50 COMPZ3 CASING PUTS P Prep floor for running liner, PU and 0.0 400.0 08:00 09:30 run 10 R3 joints 2-3/8" 4.6# L-80 slotted liner topped W two pups, 16.15' and an aluminum billet W openhole anchors, ported bullnose'on bottom, "" upper AL2 liner length - 428.58 9/8/2017 9/8/2017 0.70 COMPZ3 CASING PULD P PU I MU BHA #32 over a dead well, 400.0 489.8 09:30 10:12 tag up, set counters, open EDC, 9/8/2017 9/8/2017 2.90 COMM CASING RUNL P RIH, 400.0 12,589.8 10:12 13:06 Tie in to window flag for + 15.4' correction. Page 36151 Report Printed: 9!2712017 Operations Summary (with Timelog Liepths) a - I 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log San Depth San Time End Time Mr (hr) Phsae Op Code Advity Code Time P -T -X Opemlion fli End Depth MKa) 9/8/2017 9/8/2017 1.00 COMM CASING RUNL P Down on pumps, Close EDC, PU Wt 12,589.8 13,759.0 13:06 14:06 42.5 k lbs continue to RIH Tie into K1 for+6.5' correction Trip to bottom at 35 ft/min with 14k Ct Wt, 0 WOB S/D @ 13,759', WOB 3.38 k PU Wt 42 RBIH, S/D @ 13,759', 3.3K WOB, PU 35 It to slack weight, WOB 1.6 k, slip oriented 180 *ROHS. Online with the pumps, sheared - 4500 psi. PU Wt 40k, WOB 0 k Itis 9/8/2017 9/8/2017 2.30 COMPZ3 CASING TRIP P Park, reset counters, POCH 13,759.0 70.0 14:06 16:24 9/8/2017 9/8/2017 1.00 COMPZ3 CASING PULD P At surface, flow check - Good, PJSM, 13,759.0 70.0 16:24 17:24 LD BHA #32. 918/2017 9/8/2017 0.80 PROD4 DRILL BOPE P Weekly BOP function test, good 0.0 0.0 17:24 18:12 9/8/2017 9/8/2017 1.10 PROD4 STK PULD P PJSM, PU BHA #33, AL2 -1 lateral 0.0 78.0 18:12 19:18 drilling assembly (0 hr agitator, 0.5° AKO X-Treme motor, RB Hughes bit), slide in cart, stab on coil, check pack - offs, good, check BHI counter, lag up, set counters, open EDC 9/8/2017 9/8/2017 2.40 PROD4 STK TRIP P Begin RIH with BHA #33, close EDC 78.0 12,605.0 19:18 21:42 at 500', bring up rate, surface test agitator, good 9/8/2017 9/8/2017 0.30 PROD4 STK DLOG P Tie into K1 fo+18' correction, park, 12,605.0 12,649.0 21:42 22:00 open EDC 9/8/2017 9/8/2017 1.50 PROD4 STK DISP P Circulate hole to drilling fluid, observe 12,649.0 12,669.0 22:00 23:30 significant cuttings coming over shakers, observe small "plastic' looking material/shavings mixed with cuttings & beads, shut dawn pumps, close choke, close EDC 9/8/2017 9/8/2017 0.30 PROD4 STK TRIP P Continue RIH, tag TOB at 13,327', 12,669.0 13,327.0 23:30 23:48 PUW = 42K 9/8/2017 9/9/2017 0.20 PROD4 STK KOST P Bring rale up to 1.8 bpm, FS = 812 13,327.0 13,327.0 23:48 00:00 psi, begin kicking off billet at 150' ROHS, CWT = 14K, WOB =.71K, annular = 3900 psi, WHP = 0 psi, circ pressue = 4938 psi, 9/9/2017 9/9/2017 2.20 PROD4 STK KOST P Continue to KO billet at 13,227', FS = 13,327.0 13,337.0 00:00 02:12 860 psi, CWT = 14.3K, WOB =.55K, . annular = 3907 psi, WHP = 0 psi,. aluminum over shakers 9/9/2017 9/9/2017 1.80 PROD4 DRILL DRLG P Off billet w/o issue, drilling in 13,337.0 13,500.0 02:12 04:00 formation, CWT = 1OK, WOB = 1.5K, rate in = 1.8 bpm, annular= 3893 psi, dry drift billet up & down, clean WOB spike at 13,426' of 3852 psi, PU, FS down by -50 psi, bore pressure down by - 70 psi of bottom, continue drilling ahead watching parameters, similar event occured at 13,485' Page 37151 Report Printed: 912 712 01 7 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Shit Time End Time Dur (hr) Phase Op COW Acbrity Code Time P -T -x Operation (N(3) End Depth (flKa) 9/9/2017 9/9/2017 0.50 PROD4 DRILL DRLG P PUW = 50 K, BHA wiper, losses 13,500.0 13,538.0 04:00 04:30 began at 13,494', losing —.37 bpm, continue drilling, FS =850 psi, CWT = 9K, WOB = .43K, rale in = 1.76 bmp, rate out = 1.58 bpm, losses appear to be healing with continued drilling, experience difficulty obtaining survey 9/9/2017 9/9/2017 0.50 PROD4 DRILL WPRT T Difficulty obtaining a clean survey, 13,538.0 13,538.0 04:30 05:00 PUH in attempt to get survey as per DD, no luck, RBIH to continue drilling in attempt to obtain clean survey. 9/9/2017 9/9/2017 1.00 PROD4 DRILL DRLG P BOBD, FS = 829 psi, obtained clean 13,538.0 13,600.0 05:00 06:00 survey at 13,513', CWT =8K, WOB 2.6K, 9/9/2017 9/9/2017 0.20 PROD4 DRILL WPRT T PU, in attempt to re log missed- 13,600.0 13,473.0 06:00 06:12 surveys 9/9/2017 9/9/2017 0.60 PROD4 DRILL WPRT T RBIH , attempt to pick up missed 13,473.0 13,600.0 06:12 06:48 surveys. caught enough to continue drilling with in parameters. 9/9/2017 9/9/2017 2.30 PROD4 DRILL DRLG P Attempted to vary pump rate to clean 13,600.0 13,771.0 06:48 09:06 up surveys, no vibrations, not pump related. Appears to be interference from the AL2 liner that we just set. Ct RIHWt 10 k lbs, 1.76 bpm in/1.68 bpm out, CT 4747 psi, free spin 770 psi. OBD, WOB 1.5 to 2.5 k lbs, ROP 30- 220 Whir, ROPs increased — 13650 Send 5x5 sweep to time out for wiper Average over interval 74 ft/hr 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT T Wiper trip #1, PU 48 k lbs, PU after 13,771.0 13,350.0 09:06 09:24 5x5 exited the bit, PUH alempting to relog the misses surveys. No sucess. 9/9/2017 919/2017 0.40 PROD4 DRILL WPRT T RBIH 13,350.0 13,771.0 09:24 09:48 9/9/2017 919/2017 0.50 PROD4 DRILL DRLG P Ct RIHWt 10 k Ibs,1.75 bpm in 11.67 13,771.0 13,827.0 09:48 10:18 bpm out, Ct 4840 psi, diff 807 psi, OBD, CT Wt 7 k Itis, WOB 2 k lbs, ROP 100 Whir 9/9/2017 9/9/2017 5.20 PROD4 DRILL DRLG P Stack 3.46 k WOB @ 13,827'- no 13,827.0 14,020.0 10:18 15:30 motor work PU, 50 k attempt to restart, high weight on bit, low diff. - PU and try again, 47 k PU Wt, same results PU 49 k, 100' BHA wiper, RBIH Got a bite, making hole, lost Ct Wt Ct Wt 2.5 k, WOB 2 k lbs, ROP initially 100 ft/hr then tapered off rapidly to 50 then 30 Whir, Inc fell from 93 to 89° while drilling ahead. Got the call Q 12:50 - 13,934' to turn straight up. Having a hard time building angle. Weight transfer diminishing. Page 38151 Report Printed: 9/27/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time Erb Time Dw thin Phase Op cmi. Activity COCe Time P -T -X Operaton (Itl(B) EM Depth MKB) 9/912017 9/9/2017 0.30 PROD4 DRILL DRLG P PU and reduce rate to try and build 14,020.0 14,030.0 15:30 15:48 more angle. 1.53 bpm in/1.44 bpm out, CT 4288 psi, Diff 682 psi, Trying to target 2.5 k to 3 k WOB Ct wl -5 k lbs, WOB 1.99 k 9/9/2017 9/9/2017 1.00 PROD4 DRILL WPRT P Pump 5 x5 sweep PU Wt 42 k lbs, 14,030.0 12,752.0 15:48 16:48 PUH while sweeps travel to bit, pull to 13,855' Saw neg WOB spike @ ' 13,865' RBIH timing sweeps to exit near bottom, RIH Wt 10 k lbs PUH chasing sweeps on wiper trip through the build, saw motor work 12,880' 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT P RBIH 12,752.0 14,030.0 16:46 17:06 9/9/2017 9/912017 1.40 PROD4 DRILL DRLG P Try reduced rate and increased WOB 14,030.0 14,065.0 17:06 18:30 to build angle, confered with town, decison made to POOH and PU higher bend motor and new bit, pump sweeps 9/912017 9/9/2017 3.50 PROD4 DRILL TRIP T POOH, PUW = 45K, observe a bit of 14,065.0 78.0 18:30 22:00 motor work at -12,892' in build, park at 12,574', shut down pumps, close choke, open EDC, continue POOH, close EDC, surface test agitator, good, tag up, space out (PJSM) 9/9/2017 9/9/2017 1.80 PROD4 DRILL PULD T PUD BHA #33, checks not holding, 78.0 0.0 22:00 23:48 gather crew, quickly talk through PUD check list contingency for checks not holding, complete PUD, Hughes bit came out a 3-1 9/9/2017 9/10/2017 0.20 PROD4 DRILL PULD T Reconfigure BHA, PJSM, begin PD 0.0 0.0 23:46 00:00 BHA #34 (same agitator, 0.6+^ AKO motor, RB HYC B8 Edge bit) 9/10/2017 9/10/2017 1.30 PROIM DRILL PULD T Complete PD BHA #34 (agitator, 0.6°+ 0.0 78.0 00:00 01:18 AKO motor, RB HYC B8 Edge bit), slide in cart, stab coil, check pack -offs, open EDC, tag up, set depth counters 9/10/2017 9/10/2017 2.40 PROD4 DRILL TRIP T Begin RIH with BHA#34, close EDC, 76.0 12,587.0 01:16 03:42 test agitator at 500', good, continue RIH Note: Crew performed "Spill Drill", excellent response time & communication 9110/2017 9110/2017 0.20 PROD4 DRILL DLOG T Log K1 for+11' correction 12,587.0 12,638.0 03:42 03:54 9/10/2017 9/10/2017 0.50 PROD4 DRILL TRIP T Continue RIH 12,638.0 14,050.0 03:54 04:24 9/10/2017 9/10/2017 2.60 PROD4 DRILL DRLG P Tag bottom at 14,050'( higher than 14,065.0 14,210.0 04:24 07:00 expected (expected 14,065'), attempting to build, pumping 1.4 bpm, FS=665 psi, CWT =4K, WOB= 3.5K, annular = 3916 psi, unable to drill ahead, PU, bring up rate to 1.8 bpm, RBIH to 14,065 (expected bottom depth), FS = 1000 psi, CWT = 8.5K, WOB = 2K Page 39151 Report Printed: 9/27/2017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Depth Sten Time End Time Dm(hr) Phase op Code Activity Code Time P-T-% opm edn ffll(B) End Depth(nKB) 9/10/2017 9/10/2017 1.60 PROD4 DRILL DLOG T PU Wt40 k lbs PU to catch missed 14,210.0 14,127.0 07:00 08:36 survey. No success. Slow tripping rate, slow pump rate, park. No success. Pull up hole to re shoot old surveys, no success. Troubleshoot tools, research magnetic storm info, all indications are a tool failure. - 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Decision made to trip for tool 14,127.0 6,036.0 08:36 10:18 PUH into casing, Open EDC, Pump 2.20 bpm and POOH 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Pipe pin holed as it came across the 6,036.0 88.0 10:18 12:00 goose neck. - 6030' pin hole -15' off end of goose neck. Parked, down on pumps, bled pressure, upper checks holding. Eased coil onto the storage reel and marked hole with paint. Continued out of hole. 9/10/2017 9/10/2017 1.50 PROD4 DRILL PULD T Bump up, PUD +LD BHA#34 88.0 0.0 12:00 13:30 9110/2017 9/10/2017 0.50 PROD4 DRILL CTOP T Clean floor, install nozzle and stab on. 0.0 0.0 13:30 14:00 9110/2017 9/10/2017 3.00 PROD4 DRILL DISP T Line up coil to displace Power Pro w 0.0 0.0 14:00 17:00 water, -0.5 bpm, 1100 psi, returns to the pit. HES N2 PJSM and rig up. 9/10/2017 9/10/2017 1.50 PROD4 DRILL DISP T Water back to the pits, divert returns 0.0 0.0 17:00 18:30 to the TT, Halliburton cooling down PT to 3,500 psi., blow down surface lines & reel with N2, bleed down WHP &, coil pressure, HES rig down 9/10/2017 9/10/2017 2.70 PROD4 DRILL CTOP T Pumping managed pressure (1000 0.0 0.0 18:30 21:12 psi), align inner reel iron, slide back cart, lock out & chain reel, lock out injector, remove bulkhead & inner reel iron, cut a-line, remove depth counters Peak moved reel #5772 to 1 ES by 20:00 Ins to begin MU plates & spacers. Notification given to AOGCC for early BOPE test (10:00am 9111), witness waived by Jeff Jones. 9/10/2017 9/11/2017 2.80 PROD4 DRILL CTOP T PJSM, install grapple, pull test, 0.0 0.0 21:12 00:00 unstab, wind up, & secure coil in prep for reel swap, cut coil 9/11/2017 911112017 3.00 PROD4 DRILL CTOP T PJSM, stack cable, unlock reel, rig up 0.0 0.0 00:00 03:00 shackles/slings, remove saddle clamps, 9/11/2017 911112017 2.30 PROD4 DRILL CTOP T PJSM, Lift reel from saddles, drop 0.0 0.0 03:00 05:18 - hubs & spacers, SIMIPS remove stripper, inspect brass Note: Losing -1 bbl/hr pumping MP 9/11/2017 9/11/2017 6.70 PROD4 DRILL CTOP T Remove & replace A-frame, Cut 0.0 0.0 05:18 12:00 remaining coil in pipe shed, clean stripper and replace brass. Page 40151 Report Printed: 912712017 AN9 ft''; Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Time I End Tim Dur (hr) Phase Op code Activity Code Tma PJA Operation (11(13) End Depth (f1(B) 9/11/2017 9/11/2017 6.00 PROD4 DRILL CTOP T Flush lines, remove and replace R1 0.0 0.0 12:00 18:00 and R3, Re install stripper brass, PJSM, Load storage reel onto Peak bed truck. Crew change 9/11/2017 9/11/2017 4.00 PROD4 DRILL CTOP T pick up stripper and QTS, skid cart, 0.0 0.0 18:00 22:00 install night cap, grease stack and valves, central shops valve crew greased tree valves, flood up. 9/11/2017 9/12/2017 2.00 PROD4 WHDBOP ROPE P BOP Start time 10:00-Winless 0.0 0.0 22:00 00:00 waived by Jeff Jones AOGCC Test#1, swab -good Test #2, Lower blind, TV2 - good Test #3, TV1, - good Test #4, Upper blind, 131&5, C 4,5,8,&12, R1, Bleeders -good Test #5, C 3,6,7,&11 B2&6 and T2 - ran out 5 min -good Test #6, Manual ChokeD and Super Choke C, -good Test #7, C2, 10 and T 1 - good Test #8, Rt, Bleeder 2, Charlie 1 &9 - good 9/12/2017 9/12/2017 3.00 PROD4 WHDBOP BOPE P Continue BOPE lest 0.0 0.0 00.00 03:00 Test #9, Bravo 4 &8, Romeio 3, &. Bleeder 3 - good Test #10, Bravo 3 & 7 - good Test #11, annular BOP, - good Test #12, Upper 2-3/8" pipe slip rams, upper TIW valve - good Test #13, Lower 2-3/8" pipe slip rams - good Test #14, Lower 2" pipe slip rams - fail/pass Test #15, Upper 2" pipe slip rams, lower TIW valve - good Accumulator draw down test, good No inner reel iron test, waiting on reel Test complete in 5 hrs. 9/12/2017 9/12/2017 3.00 PROD4 DRILL CTOP T Blow down chokes, clean down lower 0.0 0.0 03:00 06:00 mast, inspect chokes, grease R7, 2, & _ 3, lay down test joint, install spacer on hub, prepping CTS counter for reel install 9/12/2017 9/12/2017 4.00 PROD4 DRILL CTOP T Continue prepping to ensure rig is 0.0 0.0 06:00 10:00 ready for reel install, change out rubber on inner reel iron, various rig cleaning projects... 9/12/2017 9/12/2017 8.00 PROD4 DRILL CTOP T Installed rebuild INJH counter 0.0 0.0 10:00 18:00 assembly, prep/dress grapple connector for new coil, install spacer plate on reel motor hub, clean INJH blocks, stock pits with sack products, two hands went to Deadhorse to help with reel mods, Build Bulk Head, test gas alarms, inspect lighting around rig, inspect elevators, work on work orders, and mop around rig. Make trip to Deadhorse to inspect work on spool. Page 41/51 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Time End Time our (hr) Phase Op Code AoaAiy Cade Time P -T -X Operation (Wlt) Eno Depth (fiKB) 9/12/2017 9/12/2017 1.50 PROD4 DRILL SFTY T Hold Nabors global safety week kick 0.0 0.0 18:00 19:30 off meeting / CTD performance YTD with Patrick Doherty and Kazeem Adegbola 9/12/2017 9/13/2017 4.50 PROD4 DRILL CTOP T Prep reel area for new spool, Service 0.0 0.0 19:30 00:00 level wind, Clean gripper blocks, Change oil in right angle drives. Work orders 9/13/2017 9/13/2017 6.00 PROD4 DRILL CTOP T Continue prepping for next reel install 0.0 0.0 00:00 06:00 9113/2017 9/1312017 10.00 PROD4 DRILL CTOP T Torqued up all pillow block bolts, put 0.0 0.0 06:00 16:00 together all tools and parts for intalling hubs, inspected SRL's and replaced tie back lines, inspected all re -heading equipment, hooked back up drawwork camera, sent 2 rig hands to Deadhorse to assist on spool mods, shipped all tubing cribbage back to warehouse. 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T Replace INJH motor #2 with new style 0.0 0.0 16:00 18:00 1 1 coupler 9/13/2017 9/13/2017 - 1.50 PROD4 DRILL CTOP T Crew change, continue replacing 0.0 0.0 18:00 19:30 coupler on motor # 2 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T New CT string on location. Swap out 0.0 0.0 19:30 21:30 nuts on hub adapters and double check torque. 9/13/2017 9/14/2017 2.50 PROD4 DRILL CTOP T Coupler upgrade complete. Spot in 0.0 0.0 21:30 00:00 reel on flatbed and dg up to pick. Pick up string and install. Torque up saddle clamps, Rig up stabbing grapple to CT and pull test 9/14/2017 9/14/2017 2.50 PROD4 DRILL CTOP T Pull CT into injector, Rig down 0.0 0.0 00:00 02:30 stabbing cable. Trim 7' of coil to find wire. Test wire, 550 MOhmes, 50.1 Ohmes Good test 9114/2017 9/14/2017 3.50 PROD4 DRILL CTOP T PJSM to install inner reel iron and CT 0.0 0.0 02:30 06:00 connector - Prep CT for CT connector and install. 9/14/2017 9/14/2017 8.50 PROD4 DRILL CTOP T Crew change, install bulkhead (5/16 th 0.0 0.0 06:00 14:30 cable) and junction box, line up wash pipe inside reel, with new clamp, check inner reel iron and secure, head -up BHI upper quick, change pac-offs, stab INJH, fluid pack reel 9/1412017 9/14/2017 0.80 PROD4 WHDBOP BOPE T Test and chart inner reel and stripper 0.0 0.0 14:30 15:18 1test 9/14/2017 9/1412017 1.00 PROD4 DRILL CTOP T Displace reel to drilling fluid, PT CTC 0.0 0.0 15:18 16:18 4,000 psi 9/14/2017 9/14/2017 1.50 PROD4 DRILL PULD T PJSM, MUIPD drilling BHA# 35m M/U 0.0 78.2 16:18 17:48 to coil and surface lest, Start BHI NPT @16:55 9/14/2017 9/1412017 3.30 PROD4 DRILL TRIP T Trip in well, No CTK depth, plug in 76.2 12,171.0 17:46 21:06 encoder, @ 11895' CTES EOP counters are off- 100'. Injector counters off depth, Clean counters on way in hole. New CT string appears to have an anti corrosion coating allowing counters to slip Page 42151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log swoepth Siad Tme End Time Our av) Pham Op Code Activity code Time P -T -x opeialion (WB) EM DeqM (flKa) 9/14/2017 9/14/2017 0.70 PROD4 DRILL DLOG T Log RA for +424'Again clean 12,171.0 12,330.0 21:06 21:48 - counters, CT still has some coating on rt 9/14/2017 9/14/2017 1.50 PROD4 DRILL TRIP T Continue in hole, Perform check 12,330.0 14,179.0 21:48 23:18 surveys, slow down to get gamma info to compare with earlier logs 13874 to 13890'- Depths off 9/14/2017 9/15/2017 0.70 PROD4 DRILL WPRT P 14179 appears to be bottom, Come up 14,179.0 13,752.0 23:18 00:00 to 1.5 BPM, wiper up hole circulating drilling fluid, cleaning up CT string, PUW=40K, Start dragging heavy @ 14009, RBIH, PUH pulling 50-55K 14009 to 13752 END BHI NPT @ 23:19 for 6.4 Hrs ' ••• TT NPT BHI MWD DGS 11.0 firs 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT P Continue up hole to tie into gamma 13,752.0 13,630.0 00:00 00:12 signature @ 13850' 9/15/2017 9/15/2017 0.30 PROD4 DRILL WPRT P RBIH, Setdown @ 13842, Attemp to 13,630.0 13,840.0 00:12 00:30 tie in sticky hole conditions preventing maintaining logging speed 9/15/2017 9/15/2017 0.40 PROD4 DRILL. WPRT P Wiper up hole to log RA, PUW=40K 13,840.0 12,650.0 00:30 00:54 9/15/2017 9/15/2017 0.40 PROD4 DRILL DLOG P Log RA for+30.5'correction 12,650.0 12,727.0 00:54 01:18 9/15/2017 9/15/2017 1.30 PROD4 DRILL WPRT P Wipe back in hole, redo check shot 12,727.0 14,210.0 01:18 02:36 surveys 9/15/2017 9/15/2017 4.00 PROD4 DRILL DRLG P 14,210', Tag bottom where it is 14,210.0 14,341.0 02:36 06:36 supposed to be. 13,850 to 14,000' area has cleared up. Drill ahead 1.8 BPM @ 5286 PSI FS, BHP=4260, RIW=-2K, DHWOB=IK, WHP=O, ECD=12.8, ROP 40 to 65 FPH New Mud at the bit 14,336' `•' Old Mud stats; 1,546' DF, 0.75% DS 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,341.0 14,341.0 06:36 07:06 perfrom check shots, unable to get clean survey's, confer with town, phone in survey IFR to Sperry Drilling/Haliburton survey management analyst 9/15/2017 9/15/2017 1.50 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,750 psi, BHP 14,341.0 14,354.0 07:06 08:36 3,970, WHIP 20, IA 0, OA 417, CTSW=2 k, DHWOB=1.5 k, ROP 10 fph 9/15/2017 9/15/2017 0.25 PROD4 DRILL WPRT T PUH, perform check shots, getting 14,354.0 14,354.0 08:36 08:51 clean survey's, RBIH 9/1512017 9/15/2017 3.25 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,715 psi, BHP 14,354.0 14,490.0 08:51 12:06 3,973, WHIP 20, IA 0, OA 417, CTSW=O k, DHWOB=1.0 k, ROP 51 fph 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,490.0 14,490.0 12:06 12:18 perfrom check shots, able to get clean survey's •" Note: Kick While drilling drill Page 43/51 Report Printed: 9127120171 ' . Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Time End Tkne our pin Phase op Coda Aavity Code Time P -T -X operekon (ftKB). End Depth(N(B) 9/15/2017 - 9/15/2017 2.85 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,715 psi, BHP 14,490.0 14,595.0 12:18 15:09 4,010, WHP 24, IA 0, OA 454, CTSW=1.7 k, DHWOB=1.5 k, ROP 60 fph 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 13,850', PUW 34 k 14,595.0 13,850.0 15:09 15:39 9/15/2017 9/15/2017 0.20 PROD4 DRILL DLOG P Log up to check depth from 13,915'- 13,850.0 13,915.0 15:39 15:51 13,872', depth ok 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 2 k. 13,915.0 14,595.0 15:51 16:21 9/15/2017 9/15/2017 0.25 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,610 psi, BHP 14,595.0 14,595.0 16:21 16:36 4,145, WHP 24, IA 0, OA 456, CTSW=minus 2 k, DHWOB=minus 5.9 k, ROP 30 fph 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT T Counter locked up, wiper up hole to 14,595.0 12,720.0 16:36 17:06 log RA marker for depth control, PUW=35K 9/15/2017 9/15/2017 0.20 PROD4 DRILL DLOG T Log Tie in for +9.5' correction 12,720.0 12,571.0 17:06 17:18 9/15/2017 9/15/2017 0.80 PROD4 DRILL WPRT 'T Wiper back in hole to drill 12,571.0 14,603.0 17:18 18:06 9/15/2017 9/15/2017 1.90 PROD4 DRILL DRLG P 14603', Drill, 1.77 BPM @ 4835 PSI 14,603.0 14,640.0 18:06 20:00 FS, BHP=4090. RIW=1.7K, DHWOB=.BK 9/1512017 9/15/2017 0.20 PROD4 DRILL WPRT P Pull BHA wiper, PUW=37K 14,640.0 14,640.0 20:00 20:12 9/15/2017 9/16/2017 3.80 PROD4 DRILL DRLG P 14640', Drill, 1.79 BPM @ 4735 PSI 14,640.0 14,759.0 20:12 00:00 FS, BHP=4735 9/16/2017 9/1612017 4.40 PROD4 DRILL DRLG P 14,759', Drill ahead, 1.78 BPM @ 14,759.0 14,858.0 00:00 0424 4735 PSI FS, BHP=3950, RIW=-4.8K, DHWOB=I.2K 9/1612017 9/16/2017 0.20 PROD4 DRILL WPRT P Pull BHA Wiper, PUW=34K, Stacking, 14,858.0 14,858.0 04:24 04:36 low surface weight, Low ROP, tough getting back to bottom, pull 100'trip 9/16/2017 9/16/2017 1.50 PROD4 DRILL DRLG P 14858, Drill, 1.79 BPM @ 4752 PSI 14,858.0 14,907.0 04:36 06:06 FS, BHP=3955, RIW=2.55K off bottom 9/16/2017 9/16/2017 2.00 PROD4 DRILL DRLG P Lower pump rate to gain ROP, PUW 14,907.0 14,959.0 06:06 08:06 35 k, 1.5 bpm at 4,070 psi FS, IA 0, OA 523BHP 3,940, WHP 0, CTSW minus 2.0 k, DHWOB=0.3 k, ROP 29 fph 9/16/2017 9/16/2017 2.50 PROD4 DRILL DRLG P PUH, by-pass screens, pump 20 14,959.0 15,000.0 08:06 10:36 beads x 20 active x 20 beads, BOBD, 1.81 bpm at 5,170 psi, BHP 4,045, WHP 0, IA 0, OA 524, CTSW=minus 2.0 k, DHWOB 0.4 k, IA 0, OA 523 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 14,000', PUW 34 k 15,000.0 14,000.0 10:36 11:06 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 1.0 k, 14,000.0 15,000.0 11:06 11:36 9/16/2017 9/1612017 0.20 PROD4 DRILL DRLG P BOBD, 1.79 bpm at 5,025 psi FS, 15,000.0 15,007.0 11:36 11:48 BHP 4,055, WHP 0, CTSW=minus 2.0 k, DHWOB=0.6 k, IA 0, OA 522 9/16/2017 9/16/2017 1.00 PROD4 DRILL WPRT P Packing off, annular pressure 15,007.0 12,720.0 11:48 12:48 increased 200 psi, wiper up hole for a tie in, pump 5x5 sweep, clean EOB Page 44151 Report Printed: 912 712 01 7 Operations Summary (with Timelog L/epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tune Log Start Depth Start Time EM Time our(ho Phase Op Code Acdvity CMe Time P -T -X Operadan (flk0) EM Depth.(Po(B) 9/16/2017 9/16/2017 0.20 PROD4 DRILL DLOG P Log RA correction of plus 10.5' 12,720.0 12,754.0 12:48 13:00 - 9/16/2017 9/1612017 0.70 PROD4 DRILL WPRT P Wiper back in hole, RIW minus 2.0 k 12,754.0 15,015.0 13:00 13:42 9/16/2017 9/16/2017 1.60 PROD4 DRILL DRLG P BOBD, 1.82 bpm at 5,250 psi, BHP 15,015.0 15,037.0 13:42 15:18 4,105, WHP 0, IA 0, OA 522, CTSW=1.0 k, DHWOB=0.6 k, ROP 21 fph 9/16/2017 9/16/2017 0.20 PROD4 DRILL WPRT P P/U for weight transfer /slight packing 15,037.0 15,037.0 15:18 15:30 off, PUW=45K 9/16/2017 9/16/2017 2.80 PROD4 DRILL DRLG P 15037', Drill, 1.42 BPM @ 4040PSI 15,037.0 15,119.0 15:30 18:18 FS, BHP=4065, RIW=-7K @ 1.4K DHWOB 9/16/2017 9/16/2017 1.30 PROD4 DRILL WPRT P Pull 100' wiper, PUW=39K, Cannot 15,119.0 15,119.0 18:18 19:36 get back to bottom. Pull 1000' wiper 9/16/2017 9/16/2017 2.40 PROD4 DRILL DRLG P 15117', Drill, 1.77 BPM @ 5022 PSI 15,119.0 15,153.0 19:36 22:00 FS, BHP=4051, RIW=-2K @ 1.2K DHWOB, Pump 10 BBI beaded pill @ 19:45 9/16/2017 9/16/2017 0.30 PROD4 DRILL WPRT P Pull 100' wiper, PUW=35K 15,153.0 15,153.0 22:00 22:18 9/16/2017 9/17/2017 1.70 PROD4 DRILL DRLG P 15153', Drill, 1.69 BPM @ 4700 PSI 15,153.0 15,186.0 22:18 00:00 FS, BHP=4032, RIW=-2K @ 1 K DHWOB 9/1712017 9/17/2017 0.30 PROD4 DRILL DRLG P Continue drilling ahead, 1.69 BPM @ 15,186.0 15,188.0 00:00 00:18 4700 PSI FS, BHP=4037 9/17/2017 9/1712017 0.20 PROD4 DRILL WPRT P Low weight, Pull 100'BHA wiper, 15,188.0 15,188.0 00:18 00:30 PUW=34K 9/17/2017 9/17/2017 0.90 PROD4 DRILL DRLG P 15188 Drill, 1.67 BPM @ 4772 PSI 15,188.0 15,200.0 00:30 01:24 FS, BHP=4066, RIW -4.5K @ 1.4K DHWOB 9/17/2017 9/17/2017 0.30 PROD4 DRILL WPRT P Low weight, Pull 100' BHA wiper, 15,200.0 95,200.0 01:24 01:42 PUW=35K 9/1712017 9/17/2017 1.50 PROD4 DRILL DRLG P 15200', Drill. 1.67 BPM @ 4787 PSI 15,200.0 15,211.0 01:42 03:12 FS, BHP=4066 Pumped 10 BBI beaded pill @ 2:31 9/17/2017 9/17/2017 1.00 PROD4 DRILL WPRT P 1 00'Wiper, PUW=34K, Got back to 15,211.0 15,211.0 03:12 04:12 bottom and could not gel drilling, Pull 400' wiper, PUW=32K, Pumped 10 BBI Beaded pill 3:05 and 4:00 9117/2017 9/17/2017 2.20 PROD4 DRILL DRLG P 15211', Drill, 1.69 BPM @ 7987 PSI 15,211.0 15,224.0 04:12 06:24 FS, BHP=4097 9/17/2017 9/17/2017 0.30 PROD4 DRILL WPRT P 200', wiper up hole, PUW 31k, pump 15,224.0 15,224.0 06:24 06:42 5x5 low/high 9/17/2017 9/1712017 8.00 PROD4 DRILL DRLG P 15,224', BOBD 1.40 bpm at 3950 psi 15,224.0 15,305.0 06:42 14:42 FS, BHP 4000, WHP 0, IA 0, OA 535, CTSW=minus 7.0 k, DHWOB=2 k, ROP=1.7 k, low ROP, weight transfer issues. 9/17/2017 9/17/2017 0.50 PROD4 DRILL WPRT P Pump 10x10 sweep, clean hole 15,305.0 15,305.0 14:42 15:12 9/17/2017 9/17/2017 4.50 PROD4 DRILL TRIP P POOH, laying in 45 bbls beaded pill, 15,305.0 71.6 15:12 19:42 perform 300' jog from 550 feet. No additional cuttings over the shaker 9/17/2017 9/17/2017 1.70 PROD4 DRILL PULD P At surface, PJSM, PUD BHA #35 71.6 0.0 19:42 2124 Page 45151 Report Printed: 9127120171 Operations Summary (with Timelog Llepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Smit Depth Stan Tire End Time Dur(hr) Phase op Code Activity Code Time P -T -X opeietion (RKB) End Depth dtKB) 9/17/2017 9/17/2017 2.40 PROD4 DRILL PULD P PJSM, M/U lower section of tool, FVS, 0.0 78.2 21:24 23:48 agitator, 2 3/8" .5° motor, RR HYC bit. PD BHA #36. Check pack offs, Change out checks in UQC. M/U to ' coil and surface test. Strip on well 9/17/2017 9/18/2017 0.20 PROD4 DRILL TRIP P Trip in well, shallow test agitator, 78.2 400.0 23:48 00:00 continue in well 9/18/2017 9/18/2017 2.20 PROD4 DRILL TRIP P Continue in well after shallow agitator 400.0 12,595.0 00:00 02:12 test 9/18/2017 9/18/2017 0.20 PROD4 DRILL DLOG P Log K1 for+7.5, PUW=29K 12,595.0 12,622.0 02:12 02:24 9/1812017 9/18/2017 2.00 PROD4 DRILL TRIP - P Continue in well, clean pass through 12,622.0 15,315.0 02:24 04:24 window, clear through 13850 to 14,000'. Last 30'tight hole conditions with low surface weight, DHWOB with no differential pressure. Annular pressure fluctuating. Multiple pick ups to work to bottom 9/18/2017 9/18/2017 5.50 PROD4 DRILL DRLG P 15315', Drill, 1.62 BPM @ 4863 PSI 15,315.0 15,382.0 04:24 09:54 FS, BHP=4228, DHWOB=I.4K RIW=- 4.6K BHA Wipers 15328',15340', 15357', 15372,15382', PUW 35-38 k 9/18/2017 9/18/2017 0.50 PROD4 DRILL CIRC P Pump 10x10 sweep, followed by 15,382.0 15,366.0 09:54 10:24 beaded drilling fluid pill 9/18/2017 9/18/2017 2.85 PROD4 DRILL WPRT P POOH, laying in drilling fliud beaded 15,366.0 1,533.0 10:24 13:15 pill, litfle motor work as well as over pulls thru 13850' area, continue POOH '•` Perform 300' jog at 1,500' 9/18/2017 9/18/2017 0.15 PROD4 DRILL SVRG P Adjust goose neck 1,533.0 1,533.0 13:15 13:24 9/18/2017 911812017 0.40 PROD4 DRILL WPRT P Continue wiper to surface, testing 1,533.0 78.2 13:24 13:48 agitator (good test) 9/182017 911812017 0.15 PROD4 DRILL TRIP P At surface, re -set counters 78.2 78.2 13:48 13:57 9/18/2017 9/182017 2.00 PROD4 DRILL TRIP P RBIH, to confirm TD 78.2 12,600.0 13:57 15:57 9116/2017 9118/2017 0.25 PROD4 DRILL DLOG P Log the K1 marker correction of plus 12,600.0 12,644.0 15:57 16:12 4.5' 9/18/2017 9/18/2017 0.25 PROD4 DRILL TRIP P PUW 28 k, continue IH, perform static 12,644.0 12,710.0 16:12 16:27 pressure check at 12710' bit depth, sensor depth 6,172 TVD, 3,723 psi AP, 11.7 ppg, and dropping. Continue IH thru window 9/18/2017 9/18/2017 1.25 PROD4 DRILL TRIP P Continue IH, RIH 8 k 12,710.0 15,380.0 16:27 17:42 9/182017 9/18/2017 0.50 PROD4 DRILL CIRC P Confirmed TD 15,380', circulate 12.0 15,380.0 15,380.0 17:42 18:12 ppg beaded liner pill into coil. 9/18/2017 9/18/2017 3.50 PROD4 DRILL TRIP P POOH, laying in 12.0 ppg liner running 15,380.0 78.2 18:12 21:42 pill with beads up to 12070', painting EOP flags at 10,900' (white) & 13,600' (yellow) 9/18/2017 9/18/2017 0.50 PROD4 DRILL OWFF P At surface, check well for flow, PJSM 78.2 78.2 21:42 22:12 for LD drilling BHA on a dead well 9/182017 9/18/2017 1.00 PROD4 DRILL PULD P LD Drilling BHA# 36 78.2 0.0 22:12 23:12 1 Page 46151 Report Printed: 912 712 01 7 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tin d Log Start Depth Stem Tme End Time Dur (hr) Phase Op Code Activity Code Terse P -T -X Operation (WB) End Depth (WB) 9/18/2017 9/18/2017 0.50 PROD4 DRILL PULD P Function test BOP slack 0.0 0.0 23:12 23:42 9/18/2017 9/19/2017 0.30 COMPZ4 CASING PULD P Prep rig floor for PU liner assembly 0.0 0.0 23:42 00:00 ' 9/19/2017 9/19/2017 - 0.30 COMPZ4 CASING CTOP P Continue preeping floor to run liner, 0.0 0.0 00:00 00:18 PJSm to run liner 9119/2017 9/19/2017 2.10 COMPZ4 CASING PUTB P M/U lower AL2 -011 liner segment with 0.0 1,673.8 00:18 02:24 non ported bullnose, 2 pups, 2 tracers # T912 Blue and T740 Freen. 39 Jts slotted liner and shorty deployment sleeve. 9/19/2017- 9/19/2017 1.70 COMPZ4 CASING PULD P PJSM, P/U coil trek with GS Spear, 1,673.8 1,718.0 02:24 04:06 M/U to liner. Set in slips, Skid injector. Swap out checks in UCC. Check pack offs, Make up to coil and surface test 9/19/2017 9/19/2017 1.40 COMPZ4 CASING TRIP P RIH BHA#37, AL2 -01 lower liner, 1,718.0 12,619.0 04:06 05:30 segment 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Correct to 10,600' EDP flag for+4' 12,614.0 12,618.0 05:30 05:36 correction, PUW=32K, DHWOB=8K 9/19/2017 9/19/2017 5.70 COMPZ4 CASING TRIP P Continue in well, Clean trip through 12,618.0 15,380.0 05:36 11:18 window and past billets. Initial setdown @ 13475. Work pipe to get -5-15 feet per cycle. Clean pick ups @ 3440K. Got clear @ 14,700' to TD @ 15380 9/19/2017 9/19/2017 0.30 COMPZ4 CASING TRIP P Liner on bottom, PUW=55K, Bring 15,380.0 13,706.2 11:18 11:36 pumps online @ 1.5BPM, PUW=30K. Liner released. PUH and remove liner length left in hole from counters, 1673.82' 9/19/2017 9/19/2017 0.40 COMPZ4 CASING TRIP P Trip out of hole, Paint 12,700' EOP 13,706.2 12,580.0 11:36 12:00 flag - Uncorrected 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Log Kt for +4'correction 12,580.0 12,614.0 12:00 12:06 9/19/2017 9/19/2017 2.10 COMPZ4 CASING TRIP P Continue trip out of well, Paint EOP 12,614.0 68.5 12:06 14:12 flag @ 11,700' 9/19/2017 9/19/2017 0.60 COMPZ4 CASING PULD P Al surface, Flow check, PJSM. Lay 68.5 0.0 14:12 14:48 down liner running tools 9/19/2017 9/19/2017 0.50 COMPZ4 CASING PULD P R/U floor to run liner, PJSM Run AL2- 0.0 0.0 14:48 15:18 Ot upper liner segment 9/19/2017 9/19/2017 2.10 COMPZ4 CASING PUTS P WU L2-01 upper liner segmet with 0.0 849.5 15:18 17:24 ported bull nose, 21 As slotted liner, and shorty deployment sleeve, Perform BOP kick while running liner drill, slide in cart, check packoffs, 9/19/2017 9/19/2017 2.70 COMPZ4 CASING RUNL P RIH with 12-01 Run #2, tie into 849.5 0.0 17:24 20:06 window flag for a +8,5' correction, lie into K1 for 0' correction, continue RIH to set depth (tagged at 13,707'), PUW = 38K, RBIH, bring up pumps to 1.4 bpm, PUW = 30K, sheared off liner 9/19/2017 9/19/2017 2.50 COMPZ4 CASING TRIP P Trip to surface, flow check well, PJSM 13,707.0 45.0 20:06 22:36 9/19/2017 9/19/2017 0.90 COMPZ4 CASING FIELD P LD BHA #38, observe flat spot- 3' up 45.0 0.0 22:36 23:30 from EOP, within spec (.124" measured for .175" pipe) 9/19/2017 9/20/2017 0.50 COMPZ4 CASING PULD P PU BHA#39 (ported bull -nose, 3 pup 0.0 50.0 23:30 00:00 1 jnts, OH anchor & aluminum billet) Page 47151 Report Printed: 912 712 01 7 Aff" Operations Summary (with Timelog vepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stmt Time End Time DUtr(hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth(MKB) 9/20/2017 9/20/2017 0.50 COMPZ4 CASING PULD P Continue PU BHA #39 (ported bull- 50.0 100.0 00:00 00:30 nose, 3 pup jnts, OH anchor & aluminum billet), slide in cart, stab on, open EDC, tag up, set counters 9/20/2017 9/20/2017 3.60 COMPZ4 CASING RUNL P RIH with BHA #39, tie in for+3' 100.0 12,857.0 0030 04:06 correction, weight check = 32K, close EDC, continue RIH to set depth, PUW = 33K, RBIH to set depth (12,856.6'), orient anchor 10° ROHS, bring up pumps, release off anchor, set down weight 4.5K WOB, good set 9/20/2017 9/20/2017 2.10 COMPZ4 CASING TRIP P POOH 12,857.0 73.0 04:06 06:12 Note: Spill Drill (Pits) 9/20/2017 9/2012017 1.20 COMPZ4 CASING PULD P PJSM, Flow check well, lay down BHA 73.0 0.0 06:12 07:24 # 39, Ahchor billet running tools 9/20/2017 9/20/2017 0.70 PROD5 STK PULD P PJSM, M/U BHA #40 to kick off liner 0.0 72.2 07:24 08:06 top billet with 1.7° motor RR HYC bi center, M/U to coil and surface test. Change packoffs, swap out UQC checks 9/20/2017 9/20/2017 2.30 PROD5 STK TRIP P RIH BHA #40 72.2 12,595.0 08:06 10:24 9/202017 9/20/2017 0.10 PRODS STK DLOG P Log K1 for+7' correction 12,595.0 12,629.0 10:24 10:30 9/20/2017 9/202017 0.10 PRODS STK TRIP P RIH 12,629.0 12,700.0 10:30 10:36 91202017 920/2017 1.70 PROD5 STK TRIP P Park and displace well back to 8.8 12,700.0 12,700.0 10:36 12:18 PPG PwrPro 9/20/2017 9/2012017 0.10 PROD5 STK TRIP P Close EDC, PUW=33K, Trip in, clean 12,700.0 12,745.0 12:18 12:24 pass through window 9/20/2017 9/20/2017 0.10 PROD5 STK DLOG P Log RA for -2.5' correction 12,745.0 12,749.0 12:24 12:30 9/202017 9120/2017 0.20 PROD5 STK TRIP P Continue in hole, Dry tag billet @ 12,749.0 12,818.0 12:30 12:42 12818, PUH 9/20/2017 9202017 0.90 PROD5 STK KOST P Bring pups on line, 1.69 BPM @ 4320 12,818.0 12,818.5 12:42 13:36 PSI FS, BHP=3945, RIW=13.1K, start milling @ 12817, made 12618.5 then had multiple stalls, reduce pump rate to 1.4BPM and work through 920/2017 920/2017 5.00 PROD5 STK KOST P Go to 2 FPH, continue to stall, working 12,818.5 12,819.0 13:36 18:36 multiple TF's, decision made to POOH & PU agitator 9/20/2017 920/2017 2.40 PROD5 STK TRIP P POOH for agitator, park above 12,819.0 72.0 18:36 21:00 window, open EDC, swap from choke A to choke B, choke fully open though still holding -1000 psi pumping minimum rate, trouble shoot, tag up 9/20/2017 9/20/2017 2.20 PROD5 STK PULD P Continue to trouble -shoot choke issue. 72.0 0.0 21:00 23:12 Decison made to PUD, then continue to trouble shoot issue once on MP, checks not holding, continue PUD, open & cleaned choke A & B (significant large, rounded, shale . pieces & aluminum in both chokes) 920/2017 9/2112017 0.80 PROD5 STK PULD P Reconfigure BHA, PJSM, PD BHA# 0.0 50.0 23:12 00:00 41 (New B8 XD Edge bit, 1.7-' AKO motor, 69 hr agitator), Page 481511 Report Printed: 9127/2017 Operations Summary (with Timelog L/epths) i C :.: .. 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start cepth start Time End Time our (hr) Phase op code Activity Code Time P -T -x operation (NKa) EM oex,(WB) 9/21/201.7 9121/2017 1.60 PROD5 STK PULD P Continue PD BHA #41, pump across 50.0 78.0 00:00 01:36 the lop, choke A & B operating as expected, change out checks, slide in cart, staff on, tag up, EDC closed 9/21/2017 9/2112017 2.50 PROD5 STK TRIP P RIH with BHA #41, surface test 78.0 12,595.0 01:36 04:06 agitator, good, observe eratic choke swings though appears to clear up; possible cuttings from down -hole, nothing unusual observed over shakers 92112017 9/21/2017 0.20 PRODS STK DLOG P Log K1 for+2.5' correction 12,595.0 12,632.0 04:06 04:18 9/21/2017 9/21/2017 0.30 PRODS STK RGRP T Park at 12,632' (install new seats mud 12,632.0 12,632.0 04:18 04:36 pump #2), PUW = 32K 9/2112017 9/21/2017 0.30 PROD5 STK TRIP P Continue RIH, stack -9K WOB at 12,632.0 12,820.0 04:36 04:54 window, PU, drop rate, RBIH without issue, log RA tag for 0' correction 9/21/2017 9/21/2017 0.20 PROD5 STK KOST P Dry lag 12,820.5' , RBIH to continue 12,819.4 12,819.4 04:54 05:06 milling, pumping 1.7 bpm, FS = 1323 psi, circ pressure = 5321 psi, CWT - =11 K, WOB =.22K, Start milling @ 12819.4 9/21/2017 9/21/2017 1.00 PROD5 STK KOST P Milling off billet, 1.69 BPM @ 5011 12,819.4 12,821.0 05:06 06:06 PSI FS, BHP=3935, 1 FPH, 9121/2017 9/21/2017 0.50 PROD5 DRILL DRLG P Go to 10-15 FPH, 1.7 BPM @ 5011 12,821.0 12,828.0 06:06 06:36 PSI FS, BHP=3990 9/2112017 9/21/2017 0.70 PROD5 DRILL DRLG P 12,828', Drill ahead, 1.7 BPM @ 5011 12,828.0 12,870.0 06:36 07:18 PSI FS, BHP=3935, RIW=10K, DHWOB=I.9K 9/21/2017 9/21/2017 0.10 PROD5 DRILL WPRT P 12870, PUH to drift billet area, 12,870.0 12,870.0 07:18 07:24 PUW=33K, Stack on billet @ 20L, clean @ 30L, RBIH to drill 9/21/2017 9/21/2017 1.40 PROD5 DRILL WAIT T Pull off bottom -exploring different, 12,870.0 12,870.0 07:24 08:48 well plan options - Ream billet area, Dry drift clean 9/21/2017 9/21/2017 2.50 PRODS DRILL DRLG P Drill ahead working WP4, 1.79 BPM 12,870.0 13,230.0 08:48 11:18 @ 5430 PSI FS, BHP=3960 9/212017 9121/2017 2.90 PRODS DRILL TRIP P Call end of build, Pump sweeps, Trip 13,230.0 78.0 11:18 14:12 out for lateral BHA, PUW=31 K 921/2017 9/21/2017 1.40 PRODS DRILL PULD P At surface, PJSM, PUD BHA #41 78.0 0.0 14:12 15:36 9/21/2017 9/21/2017 1.90 PRODS DRILL PULD P P/U New bit, C1 with 3D cutters, .5° 0.0 , 76.0 15:36 17:30 motor, and agitator. PD BHA #42 AL3 lateral drilling BHA. Make up to coil and surface test. Check packoffs 9/21/2017 9/21/2017 2.50 PROD5 DRILL TRIP P RIH, surface test agitator, good, stack 78.0 12,595.0 17:30 20:00 weight on GLM at 3,533', PU, reorient TF, continue in-hole 9/21/2017 9/21/2017 0.20 PRODS DRILL DLOG P Log K1 for+4.5' correction 12,595.0 12,635.0 20:00 20:12 9121/2017 9/21/2017 0.40 PROD5 DRILL TRIP P Continue RIH 12,635.0 13,230.0 20:12 20:36 9/2112017 9/21/2017 2.80 PRODS DRILL DRLG P OBD, FS = 1130 psi, CWT = 8K, WOB 13,230.0 13,630.0 20:36 23:24 = 1.5K, rate in = 1.75 bpm, BHP = 3987 psi, pump sweeps, average ROP over interval = -143 fph 9/21/2017 921/2017 0.30 PROD5 DRILL WPRT P WT up -hole, PUW = 32K 13,630.0 12,879.0 23:24 23:42 Page 49161 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TliiYe Log SM Deem I start rune End rune our(nr) Phase op Code Atl ity code nme P -T -x opemwn (") Erd Depth(MB) 9/21/2017 9/22/2017 0.30 PRODS DRILL WPRT P WT in-hole, RIW = 6K - 12,879.0 13,630.0 23:42 00:00 9/22/2017 9/22/2017 3.80 PRODS DRILL DRLG P BOBO, FS = 1190 psi, pumping 1.78 13,630.0 14,051.0 00:00 03:48 bpm, CWT =4.5K, WOB= 1.5K, BHP = 3964 psi, circ pressure = 5399 psi. Begin swapping to mud System #7 at 13,760', new mud at the bit at 13,816', pump sweeps, ROP over interval = 111 fph 9/2212017 9/22/2017 0.50 PRODS DRILL WPRT P Wiper up -hole, PUW = 35K 14,051.0 13,050.0 03:48 04:18 9/22/2017 9/22/2017 0.40 PRODS DRILL WPRT P Wiper in-hole, RIW=8K 13,050.0 14,051.0 04:18 04:42 9/22/2017 9/22/2017 1.20 PRODS DRILL DRLG P BOBD, FS = 1120 psi, pumping 1.8 14,051.0 14,182- 04:42 05:54 bpm, CWT = 4.7K, WOB = 1.3K, BHP = 3952 psi 9/22/2017 9/22/2017 0.10 PRODS DRILL WPRT P 14182', BHA Wiper, PUW=37K 14,182.0 14,182.0 05:54 06:00 9/22/2017 9/22/2017 0.90 PRODS DRILL DRLG P 14182', Drill, 1.79 BPM @ 5105 PSI 14,182.0 14,275.0 06:00 06:54 FS, BHP=4010, RIW=2.2K, DHWOB=1.9K 9/22/2017 9/22/2017 0.10 PRODS DRILL WPRT P 14275', BHA wiper, P11W=37K 14,275.0 14,275.0 06:54 07:00 9122/2017 9/22/2017 1.40 PRODS DRILL DRLG P 14275', Drill, 1.79 BPM @ 5105 PSI 14,275.0 14,425.0 07:00 08:24 FS, BHP=4015 9/22/2017 9/22/2017 3.40 PRODS DRILL WPRT P 14425 call TD, Chase 10 X 10 BBL 14,425.0 78.0 08:24 11:48 1 sweeps to swab valve, PUW=35K 9/22/2017 9/22/2017 PRODS DRILL WPRT P Tag up at surface, reset counters, Trip 78.0 12,595.0 11:48 11:48 in hole 9/222017 9/22/2017 2.20 PRODS DRILL DLOG P Log K1 for +1.5'correction, PUW=35K 12,595.0 12,627.0 11:48 14:00 9122/2017 9/22/2017 1.50 PRODS DRILL WPRT P Continue in hole, clear pass through 12,627.0 14,427.0 14:00 15:30 window, set down @ 12818 at 20 left, went to 30L clean past 9/22/2017 9/22/2017 3.50 PRODS DRILL CIRC P Tag 14427' corrected, Trip out 14,427.0 78.0 15:30 19:00 pumping 12 PPG beaded liner pill followed by 12 PPG completion fluid. Paint EOP flags @ 12400, 10400' 9/22/2017 9/22/2017 1.50 PRODS DRILL PULD P Flow check well, good, PJSM, LD 78.0 0.0 19:00 20:30 BHA #42 (Cl bit came out a 2-1) 9/22/2017 9/22/2017 2.90 COMPZ5 CASING PUTB P PJSM, PU AL3 liner (non -ported bull- 0.0 1,871.0 20:30 23:24 nose, 47 ints slotted liner, & shorty deployment sleeve), BOP Drill "Running Liner" 9/22/2017 9/23/2017 0.60 COMPZ5 CASING PULD P PJSM, PU BHA #34, AL3 Liner 1,871.0 1,915.0 23:24 00:00 Running Tools 9/23/2017 9/23/2017 0.70 COMM CASING PULD P Continue PU BHA #43, replace 1,915.0 1,915.0 00:00 00:42 checks, move in cart, MU to coil 9/23/2017 9/23/2017 3.00 COMM CASING RUNL P RIH with BHA #43, lie into window flag 1,915.0 14,427.0 00:42 03:42 for +8.5' correction, weight check at window = 31 K Set downs at 13,920', 14,157', 14,267', 14,384', &14,397' ' Tied into TO flag for 0' correction, arrive at setting depth, weight check = 40K, bring up pumps, release off liner, TOL = 12,556' Page 50151 Report Printed: 91271i_017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slav Depth Start Tene End Time Dw(hr) Phase op Code AdAKy Code Time P -T -X operation (ftKS) End Depth MO) 9/23/2017 9/23/2017 0.40 COMPZ5 CASING DLOG P Obtain SBHP, tool MD = 12,546', tool 14,427.0 12,541.0 03:42 04:06 TVD = 6,072', annular reached 3774 psi after 20 minutes, 11.95 ppg equivelant. 9/23/2017 9/23/2017 3.80 COMPZ5 CASING TRIP P Begin pumping seawater down coil, 12,541.0 12,541.0 04:06 07:54 displace well to seawater, diesel freeze protect from 2500' 9/23/2017 9/23/2017 1.40 COMPZ5 CASING PULD P At surface, PJSM PUD BHA #43, 12,541.0 53.0 07:54 09:18 Liner running tools, lay down tools and pull checks from UQC 9/23/2017 9/23/2017 0.70 DEMOB WHDBOP RURD P Stab back on. Flush rig and jet stack, 0.0 0.0 09:18 10:00 unstab from well 9/23/2017 9/23/2017 1.50 DEMOB WHDBOP MPSP P PJSM, R/U BPV lubricator, set BPV, 0.0 - 0.0 10:00 11:30 test plug. RID BPV lubricator and load out 9/23/2017 9/23/2017 4.50 DEMOB WHDBOP NUND P Start working RDMO check list, empty 0.0 0.0 11:30 16:00 pits, Nipple down stack, Check tree bolts Page 51151 Report Printed: 9/27/2017 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2 50-029-22637-61 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 BA ER F�UGHES E .mp, Isi ConocoPhillips ems±0 ConocOPlillips Definflive Survey Report I � Company: Conocaphilllpa(Masks) Inc.-Kup2 Project: Kupamk Riir Un0 am: Kupamk 3M Pad Wall: 3M-27 Wellbore: 3M-27 Design: 3M-27 Project Kupamk RlVer Unr, Norm Slope Alaska. United Slates Map System: US Stat. Plan. 1927 (Exact solulion) 9ystam Datum Geo Damm: NAD 1927 (NADCON CONUS) Map Zona: Ainslie Zone Do Wall 310-27 Loral CoroMlnara RaMlmme: Wall 3M-27 TVD Reference: 3M-27 C 68 Mush (3M-27) MD Rumarame: 3M-27 ® 66.00usfl (3M.27) North Refemnse: True Survey Calculation Mamod: Minimum Curvatura Database: EDTAlnses Sandbox "I poagion fWS 0.00 ..it Northing: .El-aV 0.00 usfl Easting: Pearson UncetaiMy 0.0 ..it Wellhead Elevation: W.Ilbore 3M-vAL2 MagnsScs Modal Name Stemple 0. BGGMM17 71112017 Design 3M-27AL2 Audit Notes: Version: 1.0 Phoue: ACTUAL Vertical Section: Depth From (TVD) (.eft) 6800 Mean Sea Level Using Wee Reference Point Using geodetic scale factor 6,016,60(520usR 506,294 ntuie usfl DaclMMlon 1°I 17.55 Tie On Depth: 13,38474 eNIS pan) coo Latitude: Longitude: Ground Lail: (pass) 0.00 32000 70. 27' Z1.763 IN 169°Sli'55.073W 0.00 usfl Flats SMn9M Inn 57,/97 10W017 0: 1940PM Page 2 COMPASS 5000.10 BUIM 85 I. Conoeoldhilllps Bn* s GowcoPhilli PS DeMort Rive Survey Rep Com"': ConocOPOidips(Alaska) Inc.-Kup2 Local COordBMb Rehlenu: Well W-27 Pro}m: Kupabk River Vn0 M 1, ND Rehmnce: 3M-27 @ 68.00usft (3M-27) MD W) Sita: Kupemk 3M Pad TVD luartl MD Rebmae: 3M-27 C68.00usft(3M-27) .&M lueftl D MMII: 311-27 8-4"d- Survey Tool Staub No 1 Rebrence: True WellDob: 315-27 Survey CalcYlMbn Mebod: Minimum Curvmum tft)1°nog') Oeaign: 3M-27 13,3.74 Dabbse: EDT Alaska Sand0ox 6225.07 6,15763 Survey Program 10,137.38 Dab 9252017 496155.35 18.94 8.86042 MVA (5) TIP From To 33379 62204 6.155.54 survey survey (usft) (ush) Survey ("Ibu b) T1m1 Name Oaecdplion Starr Deb End Dab 26500 12.69245 3M-27 CM -27) MM MWD -Standard 1/15/2001 496,13051 12.71250 12,746.03 3M -27A MW INC(3M-27A) MWD-INCONLY MWD-INC_ONLY-FILLER 81182017 &182017 12,778.47 13,145.03 3M -27A MM (3111 MWD MWD - Standam 811812017 828/2017 13.150.00 13,239.31 3M-27AUPB1 MWD-IW(3M-27AUPB1 MWD -INC ONLY MW41NC_0NLY_FIL R 8292017 0292017 13,270.62 13.384,74 3M-27&2PBi MM(3M-27AL2P81) MWD MWD -Standard &292017 81312017 13,415.00 15,40993 3M-27AL2 MM(3M-27AL2) MWD MWD-StanEem 91112017 W12017 Survry 10 017 4:19:4CPM Angie 3 COMPASS 500014 suA+85 IMP M 1, Var0u1 MD W) Inc 1°1 Ad. 1'1 TVD luartl TVDSS (UM) 4W4 (uan) .&M lueftl D � D49 8-4"d- Survey Tool Staub Annoletldn /�ing tft)1°nog') 13,3.74 83.22 307.91 6225.07 6,15763 3,060.18 10,137.38 8.019,651,55 496155.35 18.94 8.86042 MVA (5) TIP 13415.00 9092 33379 62204 6.155.54 3.068.07 -10,149.02 6,019.885.43 498,14388 2A 71 6,88927 MAD (6) KOP 13,144.81 9347 334.18 nMA0 8,155.40 3.114.84 -10,182,08 8,019.71218 496,13051 065 091817 MWD (6) 13.471,59 95.72 33405 8.22125 8.153.25 3,138.88 -10,173.73 8,018.1:3.19 496.11884 642 8.844.05 MAo(a) 13,499.69 99.18 33535 6.21758 0,149.58 3,184.22 -10.18572 6,018.161.A 495,186.92 1308 8,97119 MVA(8) 13.53038 86.40 =63 6,21344 6.145.44 3,191.82 -10.196.02 8.019789.13 48808461 1005 9.00024 MAD (6) 13,00Ql 91.87 33732 6211.24 6.14324 3219.55 -10,20.80 8.019,81804 486.08280 14.83 9,02905 MWD (6) 13590.51 89.57 33915 6.210.84 6.14284 3,24732 -10.220.88 6,019,814.80 499,07170 1009 8.05745 MWD (6) 13,62046 8853 33396 5.211.33 8.14333 3.274.78 -10,232.79 8,010,815.05 486,059.77 17,61 9.088.14 MM(6) 13,850.59 W62 3,07.07 8.21158 8,143M 3,301.81 -10,245.0 8019,80.12 46604655 861 8,115.37 MAO (6) 13.680.43 %81 392.14 0,21096 6,14288 3.32647 -10,25948 6.019.M 71 496,033.04 770 9.14442 AM (0) 13,70892 9031 no 19 6,210.0 6,14243 3,354.17 -10.273.93 6,019,851.40 49601857 11.6 9,17340 MAD 181 1373908 894 327M 621047 6.142.47 3,37902 9023919 6.019 Q7&23 495,00328 581 9202.25 MVA (6) 13,77060 890 32423 8.21081 6.14281 340813 -10.306.63 6.020.00,32 495.96583 1098 9,233.58 MWD (6) 13,80069 se. 32014 6,21143 8,100 3,42886 -1032828 8030.028.06 495,95716 13W 9,26364 MVA (6) 13,83049 6963 318.10 6.21194 6.14394 3.45141 -10,31578 6520.04859 495.84764 791 9.0343 MAD (6) 1366507 9200 31523 8,211.45 6,14345 3.47655 -10,368.51 6.20,073 86 485,92390 1076 932707 MAD (6) 10 017 4:19:4CPM Angie 3 COMPASS 500014 suA+85 10. ConocoPhillips COfloCDPhUlips Definitive Survey Report Co.": COhwcolmillips(Means) Inc.-Kup2 Local CO -ordinate ReMrence: Mitt -27 Project Kupamk Rarer Unit ND Reference: W-27 @ 81100us11(3M-27) Site: Kupamk 3M Pad MO Rererance: 3M-274868.00us6(3M-27) Well: W-27 Nana Reference: True Wellai W-27 Survey Calculation Method: Minimum Cu nature Cosign: 3M-27 Caucuses: EDT Masks Sandbox Survey Annotator 00722017 2:19:40PM P., 4 COMPASS 500014 Buil 85 Mag Map Vesical MO lupp 1. 19 A» 1% luraUM l "CSS Iu6Rl INI43 Ishii Northing Fasting DLS Section Survey Tool Name luanl lural (N) (p Pnow) IR 13,893 fA 9383 31394 8.210.05 6.14205 3.498.48 -10,300.73 B.ON,08358 495.90388 7,31 9,35621 MND in 13,920.ID 9542 31276 820791 6,139.91 3,51510 -10.408." ..=112.19 495.883.93 70 9,383.14 Moo (6) 13,85042 9850 31062 0,204.82 6,136.02 3,50]8 -10,43051 6.020.131.83 495.66185 B.9, 8,41239 MM)(6) 13,980.33 woo 307,83 6,20139 8,133.39 3,553.51 -10453.56 6,020.15056 495.83879 9.95 8,441.58 MND (6) 14.010.64 8855 Wiled 818].38 8.129.30 3,57142 -10,47755 6,020,16845 495,81/79 846 9,470.71 MM (6) law 55 09.89 304.85 8,192.57 8,12457 3,588% -10.50171 6.020186 .5] 495,70062 5.57 9.48936 Msi 14.070.19 10). 30575 6,18732 8,119.32 3.60542 -10,52551 1=202.0 495,783,80 371 9,52750 MM (6) 1410.45 100.54 309,3 6,191]0 6,11378 3,623.64 -10.549.02 6,020,22060 495.7027 13.16 9,558,85 MVA(6) 14,130.56 ladle` 313.75 0,178.29 6,10829 3,643.28 -10.57110 8.020.24030 495.72119 12.90 856594 "mons, 14,160]] 10.25 316M 6.1]0.0 et@.e8 3.68440 -10,591.99 ildmit6141 495,]00.28 1025 9,61556 AND (6) 14,19dl52 97M 315M 6,10 .18 6.090.10 360575 -10.612.20 6,020.202.85 495,67999 876 9,84488 MM (6) 1422091 89.09 317M 6IM,62 8,09462 3,707.78 -10.832.68 6.020304.67 495,659.36 1021 9,675.01 MNO(6) 14,250.34 95.32 320.33 BIM." 8,09182 3.]29.9, -10,852.04 6fle03MAl 405,840.18 801 9.704,30 MM (6) 14.280 37 94,33 32316 6,157.28 600920 3,753.44 -10.870,58 8,00,350.29 495,82164 9m 9.71421 MAD (6) 14,310.34 8310 328,23 6.15535 6,081.35 3,7]]84 -10,88784 6.20.37488 495.50al34 11.01 9.784,01 MAD (6) 14.34002 8942 M89 8,15488 B,MB.M 3.80,10 -10704.52 6P1039992 495,587& 12.35 9,79408 MVD(6) 14,370,87 07.05 3230 6,155M 6.07,62 3,8795 -10YHI3 O.OIDR4.75 495,57041 13.16 8024.16 MM (6) 14,401.12 86M 320V 8,157.29 6,08829 3,851.81 -10.74025 6,=44859 405,551.87 1007 90".36 MVD(6) 14.432.12 85.30 31873 615945 6,09145 3,8750 -10,78025 8.0=.40.15 495.53165 745 854520 Need, (6) 14,481.8 8391 31537 6.162.23 6,094.23 3.897.02 -10,78030 6,020,493]5 495.51171 1228 9,914.78 MWD (6) 14490.0 83.84 3120 6.18527 6,097.P 3,018]6 -10.800.71 8,020.51348 40..48137 841 11,94297 MIND (6) 14.521]] 6305 31058 6,1680 6.10.0 3,937.58 -10,Q4.02 6,020,634.28 495.88.04 792 9,973.91 MM(8) 14550.38 814 30.29 8.1]2.0 8,104.72 3,955= -10.846.22 slosh551" 485.44502 150 10,0180 MND(6) 14,581.83 82= 30307 6,177.18 6.108.19 3,9]2.91 -10,8]182 6.020."9.9 49542022 1040 10.01]0 MIND (6) 14.60D 71 8403 30340 8.18*.53 6.112.53 3.998.08 -10,69497 6,00.04.72 495,39705 667 10,0820 MOO (6) 1484180 85." 302" 6,183.34 8115.34 4.00533 -10.921." a@0."1.9, 49537037 665 10,068." MAi 14,870.19 ",]1 302.58 6,184" 8.11660 4,020" -10.94514 6.020,61725 491 093 10,11579 MND(6) 14,09. 8.89 30103 6,184.79 811878 4,11M02 -10.970.51 6.=.632 as 495,32146 9.10 10,14348 MM)(6) 14]30,]4 920 299M 6.183." 8.115" 405181 -10,90].5] 60=.64845 495,294.41 850 10.17304 MIND (6) 14.761,30 9382 302.16 8,182.18 6,11416 4,067.84 -11,02378 8,0=.64.16 495,26818 6.79 f0,=185 MWD(6) 14.79151 9415 $0442 618.0] 6,11207 4,03415 41.098.92 6020.68.85 495243.04 7. 10.230.75 MIND (6) Annotator 00722017 2:19:40PM P., 4 COMPASS 500014 Buil 85 ConocoPhillips ConocoPhillips Definitive Survey Report Conry: Con000PMlhpa(Meska) Inc Kup2 Local Co-ordinate Reference: 8511 3 2-2 7 Protect: Kupaak Ri9m Unit NO stresses: 3M -VC 68.00usg(3M.n Site Kup guk W Pad MD Reference: 32.27 C 63.00us11(3M-27) Well: 3M-27 Norte Reference: True Wanton, 314-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Annotation IO/ 017 419: 40PM Page S COMPASS 5000.14 butltl 65 Map Map Vertical MO Opel Inc (1) Aai 19 TVD lush) Woes (usRl +1,15 (sant 1 -1 (pet Nanning Seen, DL3 P IOD.) Sachs- Sune'Tool aw. Int lel (N) 14.82081 95.16 3068 6,17769 8,109.69 4,100.95 1107261 6020,697 42 05,21913 582 10,253.97 MWD(6) 14,851.46 9551 307N 8.11984 8,106.84 4,11990 -11,09727 6.020.715.65 485.1886 6.15 10188.41 NAND (6) 14,88.39 93.50 31234 6,172.56 0,1.67 4,13113 -11.119.35 6.020.7NA6 496,17251 17M 10.31707 MM (6) 14,911.6) 9194 31402 0,171.11 8.103.11 4,159.04 -11,1428 6,020755.47 495,149.82 7% 10.3460 am (a) 14941.22 8923 314.80 6,17083 6,102.63 a,9976 41.16331 6020,176.15 495,128.82 am 10.377.0 MM (6) 14.9888 9105 31514 617070 0,1876 4$01.96 -11,185.56 8,020.796.33 495,10631 68 10.406.83 MND(8( 15,8006 9233 31522 6169.95 6.101.95 4,22138 -11204.N Sol 71 495,06102 489 10436.09 MM (6) 15,030.81 90.71 319.31 8,169.13 0.101.13 4.243.94 -11,225]0 680,640 27 495,056.14 14.30 10.466.79 MVA(6) 158061 028 319.59 0.168.41 6.10041 4,203.53 -11,245.07 6.020.8488 405.048.75 469 10,496.58 shoo (6) 15.091.12 9378 Nov 618.85 6.098 be 4,290 DO -11,284.56 6,020.M 29 495,02124 697 10,4105 am (6) 15,115.75 94.60 322.. 8.16507 6,091.07 4,3841 -11,27080 8.40.98.64 485,01190 107 105518 MVA(a) 15,14570 9541 32854 61440 6,84.40 4,333.55 -11,297.12 8,02002981 494.91 14.17 10,58114 MND(M 15,1754 8320 829P SANDS 6.048 4,3.13 -11.313.01 6,020105538 494.97870 13.W 10,811.15 MVA(6) 15,205.03 9313 33135 8,166.41 6.01 4,385.08 -11,4750 6,02,98131 494,9&23 7.4 10,84034 MVID(6) 15135.10 9199 Was 6.15109 Soul 4,41144 -1',38.09 6,41,007.65 494,95102 11.25 10.6)9.01 MAD (6) 14265.81 9230 Was 616594 8,8184 4.43943 -11,34.03 8,41,03584 494938.56 0.12 10696.98 MVA(a) 15.29351 0271 4909 8.15r.72 0,006.2 4,465.4 -11,36327 8021.81 .33 404,92840 815 812967 MM (6) 15.320.37 94.12 14042 6}410 6.85.10 4.493.29 -1137255 8.021.88.48 494,919.10 705 ..7,990 MWD(6) 15,35105 9518 M3.37 0,150.58 6,082.58 4,51073 -11,382.17 8,021,1154 494.98.45 10.17 10.11864 MoD (6) 16.38013 9248 M321 514881 68061 4,50.13 -11.390.40 8.41,14330 494,90120 9.74 10,804.4 am (6) 15.40893 9264 330. 614728 6.07918 4,575.33 -11,3994 0.41,171.48 4W.89165 12.65 10,8322 Mm (6) 1514438 9261 339.44 6,14576 8,07718 4,80628 -11.411.4 641,2440 4W,BW02 0.00 10,86310 PRQIECTEDOTD Annotation IO/ 017 419: 40PM Page S COMPASS 5000.14 butltl 65 Conoco Phillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2PB1 50-029-22637-70 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 BA ER F�UGHES GE (ompany Conocofthlllips l • Cbr0C0Pllllips Definitive Survey Report Compny: ConocoPStlips (Alaska) Inc -Kup2 project: Kupamk River Unit SNa: Kupamk 3M Pad Wall: 3M-27 Wellsam: 3M-27 Da iign: 3M-27 Ponied Kupamk River Lot, NOM Slop Alaska, United Stales Map System: US Siete Plane 1927 (Exact solution) Syamm Datum Gae Datum: NAD 1927 (NAE)CON CONUS) Map Zone: Alaska Zona 04 WNI 3M-27 Local Ca rdina Rslemnce: vvill W-27 ND Reference: 3M-27 ® 69.00Us8 (3M27) MD Reference: 3M27 W 68.00usg (311-27) North Relemnce: True Survey Calculation Method Minimum Curvature Dimities.: EDT Alaska Sandbox Well Position A18 OOU i eII Northing: sE,Av 0.00 Usk Easting: Position Uncertaimy 0.00 Usk Wellhead Elevation: Wetmore 3M-Z7AL2PB1 Magnetics Madel Name Sample Oats 8GGM2016 X112017 Design 3M-27AL2PB1 Audt Notes: Version: 1.0 Phase: ACTUAL Vertical Section: Delplk F.(WIA (uaN) 611.00 Mean Sea Level Using Well Aslemnce Point Using geodetic scale factor 6,016,605.2411sfl 506.294.MusR um Declination (°I 17.53 LMKute: Longgude: Ground Level: Dip Angle P) 8100 Tie On Depth: 13,145.03 eNld +VM Direction loos) lusnl 111 0.00 0.00 320.00 70° 27' 23.753 N 149° 58' 55.073 W 0.00 Usk Feld Saengm (nn 57,543 10%2017 4: 17'44PM Papel COMPASS 5000.14 SUM 85 v ConocoPhillips EuPLES • COflOcoPhillips Definitive Survey Report Company: ConocoPMlllps(Alaska) Inc.-Kup2 Local Cooninaro Reference: Wail 3M-27 Project: Kupamk River Unit TVD RMerence: 34-27 Q 6&Wmft(3M-27) sire: Kupamk 3150 Pad MD Reference: 3M-27 Q 66.00uafi (3M27) Well. 3M-27 North Ralennce: IIue Welbore: 3M-27 Survey Calc ubrion Method Minimum Curvature Deagn: 3M27 Combas.: EDT Alaska Sandbox Survey Program Dab W1312017 Fre. TO Survey Survey (daft) Iden) Survey(WOlbore) Tod Mame Description Sun Da, End Dab 285.00 12.69205 3M-27(34-27) MWD MWD-Standard 11152001 12,712.50 12,748.03 3M-27A MVW,1NO(3M27A) MWD-INC ONLY MW0.1NC_ONLY _FILLER &1812017 &182011 12,778.47 13,145.03 3M-27A MM (3M-27A) MWD MWD-Standard W182017 81262017 13,150.00 13,239.31 30-27AL2PB1 M=-INC(3M27AI2PB1 MWD-INC ONLY MM-INC _ONLY _FIUSR &282017 &2912017 11270.82 14,244.10 3101-2750 PBI MW)(3M-27AL2PB1) MWD MWD-Standard 8292017 8,12017 Survey Map Map Vertical MD In< AM TVD TVO88 HLS 'HUM'HUMDLS Northing Basting BCCllon Survey Tool Nam. Arrogation Iden) PI (9 (Ian) (left) (Iwi) fund (ft) (111I.1100•) (N) 13,14503 90% 35779 6,254.37 6,186.P 2,82651 -10,10523 6,019,422.93 49818770 980 86m. MM (3) TIP 13,150.09 919 35795 5254.28 6.185.25 2,83048 -10,105.41 6,010,42760 489,187.51 351 8.68391 MYA-MC ONLY(4) KOP 13.178.87 94,73 35700 5352.) 6.184.77 2,860 26 -10,188.73 8,019,45769 49,18617 1272 8,611758 MW¢MCONLY pI IMBryo1818d AZlnldll 13.20982 9743 35650 6,24960 6.161.03 2.890 01 -10,10842 6,018.48742 450,184.48 017 6.11144 MWIDINOONLY I4I Intery0181ed AiimWM1 13,239.31 9964 35800 6.4522 8.177.22 2919.11 -10,11032 5018.51651 49,182.53 786 8.7349 M INC_ONLY I4I Id.ryolated A2lmWh 13,270.82 9818 35377 6.240.07 8,142.07 2.950.07 -10.11309 8.019,54747 450,17973 7.13 8.78045 MAD(5) 13,299.9 9826 349.78 6.23565 8,167.65 2.978.57 -10,11222 0.019,5759 49,17558 13.0 9.78494 MAD(B) 13,32463 9809 348.19 8,232.13 8,154.13 3,92.53 -10,12189 8.019,59892 49.17080 .. 8800.30 am (5) 13.354.71 915 34538 522825 6.16025 3,031.57 -10,12871 61019,2895 49,164.05 10.26 8832.92 MVA I5I 1338414 9322 34091 SY3563 515753 3,080.18 -10,13738 6,019.65755 408.165.35 18.94 8,68042 MM (5) 13,41483 9.91 33379 8.24.4 8,159.55 3087.92 -10,14895 8,010,885.21 49,14315 24.85 8"0.10 MVA I5I 13.444.07 9.09 328.18 6,22429 6.15&29 3,11360 -10.162.91 6,019,710.94 49,129.78 1609 8,01775 MND I5I 13.04.41 91.4 32842 622391 8,15581 3.13954 -10,170.63 8,0181".07 49,11404 590 8.90]3 MWD I5I 13,504.14 0. 330.83 6,Y12.57 6,144.57 3,165.14 -10,193]0 8,019.76245 49.9895 865 8.077.02 MWD (5) 13.534.68 "SO 33528 629.30 8.152.30 3.192.24 -10,207.53 6.010,789. 4.06510 17.23 8.98.87 MWD (6) 13.555" 9315 33662 6.217.97 6.149.97 3.=0 S5 10,22507 8.019.81763 498.07353 871 9.03626 MVA(M 13.594.77 91.35 33794 8,21682 8.140.82 9,247. -10.231.35 6,019.8a4 57 49,06123 7" 908416 MWD(5) 13.04.88 9147 33635 6218" 5,148.06 3.274.94 -10.43.28 6.018,97220 ..921 661 9.08301 am (5) 13,654.51 9178 33278 6,21524 6.147.24 3,301.58 -10,258.24 6.019,89081 49.038.30 874 9.12173 MM (5) 1022017 4:17:44PM PSDB 3 COMPASS 500014 Budd 85 ConoCoPhillips BM!P_!._ • CbrocOPIIlllps Definitive Survey Report Cempmry: CoreoOPkillips(Nasya) loc,-KUP2 Local Co-ordinate Reference'. Well 3M-27 pro}[t Kupruk Rim Unit TVD Reference. W-27@"8Wusfl(3M-27) Sib: Kupamk 3M Pad MD Reference: 3M-27 Q 6800usS(310-27) Mil: 3M-27 North Reference_ True MRllbola: 3M-27 Survey Calculation Method'. Minimum Curealure Duan: 3M-27 Database: EDT Alaska Sandbox S." 1O 074:17420 Pape4 COMPASS SWO 14 SV40 85 Map Map Vertical MD (haft) 114) 1°I AL PI TVD feel .DSS lusMl 4.48 luaD) than) luahl Redoing Eastn9 018 ('2000') Sermon 8uhh,, T.1 Mama AfIDObtiM IRI IMI IMI 13.684. T1 9021 32)Bd 6,2171 6W71 3,39.79 -10.27118 6010,92502 45402133 17.16 9.15143 MNO(5) 13,71482 8037 32473 6.214.56 6,14856 3,35283 -10.287W 6,019.999.04 496.004.80 10.35 91181.35 MND(5) 13,72050 BOm 322.34 6.21423 6,14823 337869 -10305:4 5919.97 .89 495,9%.95 824 8,21097 MAD (5) 13.7,t 4. 90" 318.27 6.21378 6,14578 3,309% -10.E4641 6.018,996 .87 405.06284 1361 9,240.86 M)A(5) 13804.44 9089 31523 6.213.33 6,14533 3.421.57 -10,34521 6,020,01072 495,94724 10.12 9,90& MVA(5) 13,834.37 80. 313" 6,21285 6""85 3.44248 -10,366.61 8.020,999.62 49592582 5N 8.300.62 MM (5) 13.88428 89.14 30997 6242.71 8,1"11 3A6238 40.38894 8,020,05849 405,903.48 12.58 8.33021 McD(5) 13694.20 8883 3128 621293 8,1".93 3.482.14 -10.41140 6,020079.23 49588101 920 9.359.79 MIND (5) 1392423 87,N 314,N 6,21375 9.14575 3,50276 -10,43321 6,02008983 495,859.16 9.11 9,38960 MAD (5) 13,95421 86." 31778 9,21529 6.147.29 3.524.26 -10,464.99 9.020.12131 495,83834 12.50 0,410" MNq(6) 13, 866.in 07. 31964 6,21874 6,148.74 8548.17 -10,474% 6,020.145.20 49581739 7.. 9,451.23 MRO(5) 14.014.23 89.91 39948 6.21727 6,149.27 3.589.82 -10,493.03 6.620,1%.. 485.799.30 7.32 9,47043 MKp(5) 14.0"12 92W =(I't 6,21663 0,14063 3.592.89 -10,512.02 6.00.189.89 495.760.30 8.85 9.500.31 MNt1(5) 14,074.10 9507 32117 6214. 6.149.. 3,61611 -10.53. ii.M.21309 49576142 859 8.53922 mm (5) 1410,49 9574 32287 621162 8,14362 3.63a 15 -10..8.67 8,020236.11 495,74341 &09 9.56843 MVA(5) 14,134.10 97.08 32422 6,0793 8,130.93 3.663.59 -10,506.83 6,020,260.. 485,72534 452 9.5887 MIND (5) 14,16e.21 9910 324.10 6.203.70 6.135.70 3,699]6 -10584.38 5020,204.. 495.70787 672 9.62648 MND(6) 14,11M.17 9828 32596 8,198.91 8,130.91 3.711.89 40.60133 6,020308. 499,690.99 6.16 965795 MM (S) 14,22421 100.. 3278 9,193.66 6.125.66 3,738 76 -10,917.51 6,020,333.. 49567470 776 9967.82 MM (5) 14,2".18 101.21 325]9 8,189.. .,121.. 3,753.14 -10.628.25 6,020,350.03 41e,66394 067 9)06]8 MM (5) 14.28000 10121 32578 6.102" 6,114.88 3,78220 -10,.Bol 6,020.379.0 495.6".16 000 9,741.74 PRNECTEDWTO 1O 074:17420 Pape4 COMPASS SWO 14 SV40 85 RECEIVED OCT 16 2017 AOGCC BAT �V . K '; aCiEiH ES To: Letter of Transmittal Date: October 16, 2017 CD in 217-053 DATA Lo.,GED `°1,,,,o„ W K BENDER Makana Bender AOGCC 333 West 711 Ave, Suite 100 Anchorage, Alaska 99501 From: Yosha Ragbirsingh / Michael Soper Baker Hughes, a GE Company 795 East 94`" Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3M -27A 3M-27AL1 3M-27AL2PB1 3M-27AL2 3M-27AL2-01 3M-27AL3 2A -22A 2A-22AL1 (8) Total prints 217-053 28680 217-054 28681 217-055 28682 217-055 28683 217-056 28684 217-057 28685 Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael.Soper@BHGE.com Yosha Ragbirsingh, Baker Hughes, Survey Manager Yosha.RaRbirsineh(a)BHGE.com ConocoPhillips RECEIVED OCT 16 2017 A®GCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2 50-029-22637-61 Baker Hughes INTEQ Definitive Survey Report 06 October. 2017 217-055 28682 BA ER F�UGHES a GE company 1016/2017 4: 19: 40PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips 8% ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kupauk 3M Pad MD Reference: 3M-27 Q 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level j Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 3M-27 Welt Position +N/ -S 0.00 usft Northing: 6,016,606.24 usft Latitude: 70° 27'23.753 N +E/ -W 0.00 usft Easting: 506,294.30usft Longitude: 149° 56'55.073 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3M-27AL2 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) (1) (nT) BGGM2017 7/1/2017 17.55 80.99 57,497 Design - -3M-27AL2 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 13,384.74 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) V) 68.00 000 0.00 320.00 1016/2017 4: 19: 40PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips BA ER ConocoPhilli p s � " Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 l Project: Kuparuk River Unit ND Reference: 3M-27 @ 68.00usft (310-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (310-27) Well: 310-27 North Reference: True Wellbore: 310-27 Survey Calculation Method: Minimum Curvature Design: 310-27 Database: EDT Alaska Sandbox i. Survey Program-� Date 9/25/2017 From To Survey Survey (usft) (usft) Survey (Wellborn) Tool Name Description Start Date End Date 265.00 12,692.45 3M-27 (310-27) MWO MWD -Standard 1/15/2001 12,712.50 12,746.03 3M -27A MWD -INC (3M -27A) MWD -INC -ONLY MWD -INC -ONLY _ FILLER 8/18/2017 8/18/2017 12,778.47 13,145.03 3M -27A MWD(3M-27A) MWO MWD - Standard 8/18/2017 8/26/2017 13,150.00 13,239.31 3M-27AL2PB1 MWD -INC (3M-27AL2PB1 MWD -INC -ONLY MWD -INC -ONLY -FILLER 8/29/2017 8/29/2017 13,270.82 13,384.74 3M-27AL2P81 MWD(3M-27AL2PB1) MWD MWD - Stantlard 8/29/2017 8/3112017 j 13,415.00 15,409.93 3M-27AL2 MWD(3M-27AL2) MWD MWD -Standard 9/1/2017 9/7/2017 ( "Survey Map Vertical .. MD Inc AziMap ND NDSS +N/ -S +E/ -W (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting 0100) Section Survey Tool Name ADDOtB(100 13,384.74 93.22 340.91 6,225.63 6,157.63 3,060.18 -10,137.38 6,019,657.55 496,155.35 18.94 8,860.42 MWD (5) 71p 13415.00 90.92 333.79 6,224.54 6,156.54 3,088.07 AQ149.02 6,019,68543 496,143.69 24.71 8,889.27 MWO (6) KOP 13,444.81 93.47 334.19 6,223.40 6,155.40 3,114.84 -10,162.08 6,019,712.18 496,130.81 866 8,918.17 MWD (6) 13,471.59 95.72 334.05 6,221.25 6,153.25 3,138.86 AQ173.73 6,019,736.19 496,118.94 8.42 8,944.05 MWD (6) 13,499.89 99.19 335.35 6,217.58 6,149.58 3;164.22 -10,185.72 6,019,761.54 496,106.92 13.08 8,971.19 MWD (6) 13,530.39 96.40 336.63 6,213.44 6,145.44 3,191.82 -10,198.02 6,019,789.13 496,09461 10.05 9,OOD.24 MWO (6) 13,560.61 91.97 337.32 6,211.24 6,143.24 3,219.55 -10,209.80 6,019,816.84 496,082.80 14.83 9,029.05 MWD(6) 13,590.51 8957 339.15 6,210.84 6,142.84 3,247.32 -10,220.89 6,019,844.60 496,071.70 10.09 9,057.45 MWD (6) 1 13,62046 88.53 333.98 6,211.33 6,143.33 3,274.78 -10,232.79 6,019,872.05 496,059.7 1761 9,086.14 MWD (6) 13,650.59 90.52 334.07 6,211.58 6,143.58 3,301.87 -10,245.99 6,019,899.12 496,046.55 661 9,115.37 MWD (6) 13,680.43 91.81 332.14 6,210.98 6,142.98 3,328.47 -10,259.48 6,019,925.71 496,03304 7.78 9,144.42 MWD(6)I 13,70992 90.31 329.19 6,210.43 6,142.43 3,354.17 -10,273.93 6,019,95140 496,018.57 11.22 9,173.40 MWD (6) 13,73909 89.54 327.68 6,210.47 6,142.47 3,379.02 -10,289.19 6,019,976.23 496,00328 5.81 9,202.25 MWD(6) 13,70.60 8923 324.23 6,210.81 6,142.81 3,405.13 -10,306.83 6,020,002.32 495,985.63 10.99 9,233.58 MWD (6) 13,80069 88.40 320.11 6,211.43 6,143.43 3,428.88 -10,325.28 6,020,026.06 495,967.16 13.96 9,263.64 MWO (6) 13,83049 8963 318.10 6,211.94 6,143.94 3,45141 -10,344.78 6,020,09656 495,94764 7.91 9,293.43 MWD (6) � 13,865.07 92.00 315.23 6,211.45 6,143.45 3,476.55 -10,368.51 6,020,07368 495,923.90 10.76 9,327.94 MWD (6) COMPASS 5000.14 Build 85 10/6@017 4:19:40PM Page 3 ConocoPhillips Company: Project Site: Well: Wellborn: Design: Survey I I MD (usft) 13,893.50 13,920.70 13,95042 13,980.33 14,010.54 14,040.55 14,070.19 14,10045 14,130.56 14,160.77 14,190.52 14,220.91 14,250.34 14,280.37 14,310.34 14,340.62 14,370.87 14,401.12 14,432.12 14,461.80 14,490.30 14,521.77 14,550.38 14,581 83 14,609.71 14,641A0 14,670.19 14,699.34 14,730.74 14,761.36 14,791.51 ConowPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kupamk 3M Pad 3M-27 3M-27 3M-27 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (3M-27) 31y-27 (I 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox 101612017 4:19:40PM Page 4 BA ER I UGNPS Annotation COMPASS 5000.14 Build 85 Map Map Vertical Inc Azl TVD TVDSS +N/ -S +E/ -W DLS Northing Easting Section Survey Tool Name (usft) (usft) (usft) (usft) (ft) (ft) (=/100') (ft) 93.63 313.94 6,21005 6,142.05 3,496.48 -10,388.73 6,020,093.59 495,903.66 7.31 9,356.21 MWD(6) 9542 312.78 6,207.91 6,139.91 3,515.10 -10,408.44 6,020,112.19 495,883.93 7.83 9,383.14 MAID (6) 96.50 310.62 6,204.82 6,136.82 3,534.76 -10,430.51 6,020,131.83 495,861.85 8.09 9,412.39 MWD(6) 96.69 307.63 6,201.39 6,133.39 3,553.51 -10,453.56 6,020,15056 495,838.79 9.95 9,441.55 MWD (6) 98.55 305.86 6,197.38 6,129.38 3,571.42 -1047].55 6,020,168.45 495,814.79 846 9,470.71 MvvD(6) 99.89 304.85 6,192.57 6,124.57 3,588.55 -10,501.71 6,020,18557 495,790.62 5.57 9499.36 MAID (6) 10054 305.75 6,187.32 6,119.32 3,605.42 -10,525.51 6,020,202.40 495.766.80 3.71 9,527.58 MWD(6) 100.54 309.80 6,181.78 6,113.78 3,623.64 -10,549.02 6,020,220.60 495,743.27 13.16 9,556.65 MWD (6) 100.45 313.75 6,176.29 6,108.29 3,643.36 -10,571.10 6,020,240.30 495,721.19 12.90 9,585.94 MM (6) 100.25 316.89 6,170.86 6,102.86 3,664.48 -10,591.99 6,020,261.41 495,700.28 10.25 9,615.56 MWD (6) 97.86 315.84 6,166.18 6,098.18 3,685.75 -10,612.26 6,020,282.65 495,679.99 8.76 9,644.88 MWD (6) 95.60 317.98 6,162.62 6,094.62 3,707.78 -10,632.88 6,020,304.67 495,659.36 10.21 9,675.01 MWD(6) 95.32 320.33 6.159.82 6,091.82 3,729.94 -10,652.04 6,020,326.81 495,640.18 8.01 9,704.30 MWD (6) 94.33 323.16 6,157.29 6,089.29 3,753.44 -10.670.56 6,020,350.29 495,621.64 9.95 9,734.21 MWD (6) 93.10 32823 6,155.35 6,087.35 3,777.84 -10,687.84 6,020,374.68 495,604.34 11.01 9,764.01 MWD (6) 89.42 326.89 6,154.68 6,086.68 3,803.10 -10,704.52 6,020,399.92 495,587.64 12.35 9,794.08 MM (6) 87.05 323.69 6,155.62 6,087.62 3,827.95 -10,721.73 6,020,424.75 495,570.41 13.16 9,824.18 MWD (6) 86.62 32067 6,157.29 6,089.29 3,851.81 -10,740.25 6,020,448.59 495,551.87 10,07 9,854.36 MWD (6) 85.36 318.73 6,159.45 6,091.45 3,875.39 -10,760.25 6,020,472.15 495,531.85 7.45 9,885.28 MWD(6) 83.91 315.37 6,162.23 6,094.23 3,897.02 -10,780.38 6,020493.76 495,511.71 12.28 9,914.78 MWD(6) 83.84 312.96 6,165.27 6,097.27 3,916.76 -10,800.71 6,020,513.48 495,491.37 8.41 9,942.97 MWD (6) 83.05 310.58 6,168.86 6,100.86 3,937.58 -10,824.02 6,020534.28 495,468.04 7.92 9,973.91 MM (6) 81.46 306.29 6,17272 6,104.72 3,955.20 -10,846.22 6,020,551.88 495,445.82 15.86 10,00168 MWD (6) 82.20 303.07 6,177.19 6,109.19 3,972.91 -10871.82 6,020,569.57 495,420.22 10.40 10,031.70 MWD (6) 84.03 303.40 6,180.53 6,112.53 3,988.08 -10,894.97 6,020,584.72 495,397.05 6.67 10,058.20 MM (6) 85.88 302.36 6,183.34 6,115.34 4,005.33 40,92165 6,020,601.94 495,370.37 6.65 10088.56 MWD (6) 88.71 302.58 6,18469 6,116.69 4,02066 -10,94574 6,020,617.25 495,346.26 9.93 10,115.79 MM (6) 90.89 30703 6,184.79 6,116.79 4,036.02 -10,970.51 6,020,632.59 495,321.48 9.18 10,143.48 MWD (6) 92.52 299.80 6,183.86 6,115.86 4,051.91 -10,997.57 6,02064845 495,294.41 6.50 10,173.04 MWD (6) 93.82 302.16 6,182.16 6,114.16 4,06764 -11,023.78 6,020,664.16 495,268.19 8.79 10,201 95 MWD(6) 94.15 304.42 6,180.07 6,112.07 4,084.15 -11, D48.92 602068065 495,243.04 7.56 10230.75 MWD (6) 101612017 4:19:40PM Page 4 BA ER I UGNPS Annotation COMPASS 5000.14 Build 85 ConocoPhillips sA 'Pl s 'c ConocoPhilli p Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Project Kuparuk River Unit Site: Kupamk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Survey Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Annotation 10/&2017 4:19:40PM Page 5 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS +N/-8 +E/•W DES, (usft) (°) (') Waft) (usft 1 (usft) (usft) Northing Easting (°1100') Section Survey Tool Name (ft) (ft) (ft) 14,820.81 95.16 30580 6,177.69 6,109.69 4,100.95 -11,072.81 6,020,697.42 495219.13 5.82 10,258.97 MWD (6) 14,851.46 95.51 307.65 6,174.84 6,106.84 4,119.20 -01,097.27 6,020,715.65 495,194.66 6.15 10,288.67 MWD (6) 14,880.39 93.50 312.34 6,172.56 6,10457 4,137.73 -11,119.35 6,020,734.16 495,172.57 17.56 10,317.07 MM (6) 14,911.60 91.84 314.02 6,171.11 6,103.11 4,15996 -11,142.09 6,020,755.47 495,149.82 7.56 10,348.02 MWD (6) 14,941.22 89.23 314.64 6,170.83 6,102.83 4,17916 -11,16327 6,020,776.15 495,128.62 9.06 10,377.49 MWD (6) 14,972.68 91.05 315.14 6,170.76 6,10276 4,201.96 -11,185.56 6,020,79833 495,105.31 6.00 10,408.83 MWD (6) 15,00095 92.33 315.22 6,169.95 6,101.95 4,221.36 -11,204.84 6,020,817.71 495,087.02 4.69 10,436.09 MWD (6) 15,030.81 90.71 319.31 6,169.13 6,101.13 4243.94 -11,225.70 6,020,84027 495,066.14 14.30 10,466.79 MWD(6) 15,060.61 92.08 319.59 6,168.41 6,100.41 4,266.58 -11,245.07 6,020,862.89 495,046.75 4.69 10,496.58 MWD (6) 15,091.12 93.78 320.87 6,166.85 6,098.85 4,290.00 -11,264.56 6,020,886.29 495,027.24 6.97 10,527.05 MWD(6) 15,115.75 94.50 322.46 6,165.07 6,097.07 4,309,27 -11,279.80 6,020,905.54 495,011.99 7.07 10,551.60 MWD (6) 15,145.70 9572 326.54 6,162.40 6,094.40 4,333.55 -11,297.12 6,020,929.81 494,994.65 14.17 10,581.34 MM (6) 15,175.92 93.20 32977 6,160.05 6,092.05 4,359.13 -11,313.01 6,020,955.38 494,978.74 13.53 10,611.15 MWD (6) 15,205.68 93.13 331.86 6,158.41 6,09041 4,385.08 -11,327.50 6,020,981.31 494,964.23 7.02 10,640.34 MWD (6) 15,235.19 91.99 334.98 6,157.09 6,089.09 4,41144 -11,340.69 6,021,007.65 494,951.02 11.25 10,669.01 Mm (6) 15,265.81 92.30 337.45 6,155.94 6,087.94 4,439.43 -11,353.03 6,021,035.64 494,938.66 8.12 10,698.39 MWD (6) 15,293.51 92.77 339.09 6,154.72 6,086.72 4,465.14 -11,363.27 6,021,061.33 494,928.40 6.15 10,724.67 MWD (6) 15,320.37 94.12 340.42 6,153.10 6,085.10 4,490.29 -11372.55 6,021,086.48 494,919.10 7.05 10,749.90 MWD(6) 15,351.45 95.28 343.37 6,150.% 6,082.56 4,519.73 -11,382.17 6,021,11590 494,909.45 10.17 10,778.64 MM (6) 15,380.13 9249 343.21 6,148.61 6,080.61 4,547.13 -11,390.40 6,021,143.30 494,901.20 974 10,804.92 MWD (6) 15,409,93 92.64 33944 6,147.28 6,079.28 4,575.33 -11,399.93 6,021,171.48 494.891.65 12.65 10,832.64 MWD(6) 15,443.00 92.64 33944 6,145.76 6,077.76 4,606.26 -11,411.53 6,021,202.40 494,880.02 000 10863.79 PROJECTED to TD Annotation 10/&2017 4:19:40PM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips RECEIVED OCT 16 201i AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2PB1 50-029-22637-70 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 217-055 28683 BA ER F�UGHES a GE company Welders 3M-27AL2P81 Magnetics Model Name Sample Date BGGM2016 7/1/2017 Design 3M-27AL2PB1 Audit Notes ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (310-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,016,606.24usft Latitude: 506,294.30usft Longitude: on: usft Ground Level: Declination V) 17 53 Version: I Phase: ACIUAL Tie On Depth: 13,145.03 Vertical Section: Depth From (TVD) +147-S (usft) (usft) 68 00 0.00 +El -W (usft) 000 Dip Angle (I 81.00 Direction (1) 32000 BAER uGRFs 70° 27'23.753 N 149° 56'55.073 W 0.00 usft Field Strength (nT) 57,543 10/612017 4: 17 44P Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellborn: 314-27 Design: 3M-27 Project Kuparuk River Unit, North Slope Alaska, United States �— Map System: US Slate Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3M-27 Well Position +N/ -S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead E Welders 3M-27AL2P81 Magnetics Model Name Sample Date BGGM2016 7/1/2017 Design 3M-27AL2PB1 Audit Notes ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (310-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,016,606.24usft Latitude: 506,294.30usft Longitude: on: usft Ground Level: Declination V) 17 53 Version: I Phase: ACIUAL Tie On Depth: 13,145.03 Vertical Section: Depth From (TVD) +147-S (usft) (usft) 68 00 0.00 +El -W (usft) 000 Dip Angle (I 81.00 Direction (1) 32000 BAER uGRFs 70° 27'23.753 N 149° 56'55.073 W 0.00 usft Field Strength (nT) 57,543 10/612017 4: 17 44P Page 2 COMPASS 5000.14 Build 85 ConocoPhillips 6A<ER p { ConocoPhillips Definitive Survey Report UGHES Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Local Co-ordinate Reference: TVD Reference: Me Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 3M-27 @ 68.00usit (3M-27) 3M-27 ,@ 66.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Survey Program Date 9/13/2017 Survay Tool Name (R) From To Map Map MWD -INC _ONLY (4) (usR) (usR) Survey(Wellbore) Tool Name Description 265.00 12,692.45 3M-27 (3M-27) MWD MWD - Standard 12,712.50 12,746.03 3M -27A MWD-INC(3M-27A) MWD -INC -ONLY MWD -INC _ONLY -FILLER 12,778.47 13,145.03 3M -27A MWD(3M-27A)MWD Easting MWD - Standard 13,150.00 13,239.31 3M-27AL2PB1 MWD -INC (3M-27AL2PB1 MWD -INC -ONLY MWD4NC_ONLY_FILLER 13,270.82 14,244.18 3M-27AL2PBI MWD(3M-27AL2PB1) MWD MWD- Standard Survey Survey Start Date 1/15/2001 8/18/2017 8/18/2017 8/29/2017 8/29/2017 Vertical Section Survay Tool Name (R) 8,659.96 Map Map MWD -INC _ONLY (4) MD Inc Azi TVD TVDSS +NI -S +E/•W MWO(5) 8,784.94 DLS 8,806.30 MWD(5) 8,832.92 MWD (5) 8,860.42 MWD (5) 8,889.10 Northing Easting MWD (5) (usR) (°) (I (uaR) Wait) (usR) Wait) MWD (5) 9,064.16 (°1100') 9,093.01 MWD (5) 9,121.73 MWD (5) (ft) (ft) 13,145.03 90.98 357.79 8,254.37 6,166.37 2,825.51 -10,105.23 6,019,422.93 496,187.70 9.80 13,150.00 91.05 357.95 6,254.28 6,186.28 2,830.48 -10,105.41 6,019,427.90 496,187.51 3.51 13,179.87 9473 357.00 6,252.77 6,184.77 2,860.28 -10,106.73 6,019,457.69 496,186.17 12.72 13,209.82 97.43 356.50 6,249.60 6,181.60 2,890.01 -10,10842 6,019,487.42 496,184.46 9.17 13,239.31 99.64 356.00 6,24522 6,17722 2,919.11 -10,110.32 6,019,516.51 496,182.53 7.68 13,270.82 99.18 353.77 6,240.07 6,172.07 2,950.07 -10,113.09 6,019,54747 496,179.73 7.13 13,299.96 98.28 349.76 6,235.65 6,167.65 2,978.57 -10,117.22 6,019,57596 496,175.58 13.95 13,324.63 98.09 348.19 6,232.13 6,164.13 3,002.53 -10,121.89 6,019,59992 496,170.89 6.35 13,354.71 96.76 345.38 6,228.25 6,160.25 3,031.57 -10,128.71 6,019,628.95 496,169.05 10.26 13,384.74 9322 340.91 6,225.63 6,15763 3,060.18 -10,137.38 6,019,657.55 496,155.35 18.99 13,414.83 9092 333.79 6,224.54 6,156.55 3,087.92 -10,148.95 6,019,685.27 496,143.75 24.85 13,444.07 90.09 329.16 6,224.29 6,156.29 3,113.60 -10,162.91 6,019,710.94 496,129.78 16.09 13,474.41 91.72 328.42 6,223.81 6,155.81 3,139.54 -10,178.63 6,019,736.87 496,114.04 5.90 13,504.14 93.04 330.63 6,222.57 6,154.57 3,165.14 40,193]0 6,019,762.45 496,098.95 8.65 13,534.66 95.50 335.29 6,22030 6,152.30 3,192.24 -10,207.53 6,019,789.54 496,085.10 17.23 13,565.53 93.16 336.62 6,21].97 6,149.97 3,220.35 -10,220.07 6,019,817.63 496,072.53 8.71 13,594.77 91.35 33].94 6,216.82 6,148.82 3,247.30 -10,231.35 6.019,844.57 495,061.23 7.66 13,624.89 91.47 335.35 6,216.08 6,148.08 3,274.94 -10,243.29 6,019,872.20 496049.27 861 13,654.51 91.78 332.78 6,215.24 6,14724 3,301.56 -10,256.24 6,019,898.81 496,035.30 8.74 Survey Start Date 1/15/2001 8/18/2017 8/18/2017 8/29/2017 8/29/2017 Vertical Section Survay Tool Name (R) 8,659.96 MWD (3) 8,663.91 MWD -INC _ONLY (4) 8,687.58 MWD -INC ONLY(4) 8,711.44 MWD -NC _ONLY (4) 8,73496 MWD-INC_ONLY (4) 8,760.45 MWO(5) 8,784.94 MM (5) 8,806.30 MWD(5) 8,832.92 MWD (5) 8,860.42 MWD (5) 8,889.10 MWD(5) 8,917.75 MWD (5) 8,947.73 MWD(5) 8,977.02 MVD (5) 9,006.67 MWD (5) 9,036.26 MWD (5) 9,064.16 MWD (5) 9,093.01 MWD (5) 9,121.73 MWD (5) Survey End Date i 8/18/2017 8/26/2017 6/29/2017 8/31/2017 Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth Interpolated Azimuth 101612017 4:17:44PM Page 3 COMPASS 5000.14 Build 85 101. ConoCoPhillip5 ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit ND Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox survey MD Inc TVD NDSS +N/-5 +El -W Map Map DLS Vertical (I (6,21 (6,14 (usk) (usft) Northing Easting ('1100') Section Survey Tool Name (ft) (ft) (ft) 13,68(usft 13,684.]2 90 90.21 32].84 32 6,214.71 6,146.]1 3,327.79 -10,271.19 6,019,925.02 498021.33 17.16 9,151.43 MWD (5) 13,714.82 90.37 324.73 6,214.56 6146.56 3,352.83 -10,287.90 6,019,95004 496,00460 10.35 9,181.35 MWD (5) 13,744.50 90.89 322.34 6,214.23 6,146.23 3,376.69 -10,305.54 6,019,973.89 495,98E5.95 8.24 9,210.97 MWD (5) 13,774.40 90.83 31827 6,213.78 6,145.78 3,399.69 -10,324.63 6,019,996.87 495,967.84 13.61 9,240.86 MWD (5) 13,804.44 90.89 315.23 6,213.33 6,145.33 3,421.57 -10,345.21 6,020,01872 495,947.24 1012 9,270.84 MM (5) 13,834.37 90.98 313.44 6,212.85 6144.85 3,442.48 -10,36&61 6,020,03962 495,925.82 5.99 9,300.62 MWD(5) 13,864.28 89.54 309.97 6,212.71 6,14471 3,46238 -10,388.94 6020,059.49 495,903.48 12.56 9,330,21 MM (5) 13,89420 8963 312.72 6,212.93 6,144.93 3,482.14 -10,411.40 6,020,07923 495,88161 9.20 9,359.79 MWD(5) 13,924.23 8724 314.05 6,213.75 6,14515 3,502.76 -10,433.21 6,020,099.83 495,859.18 9.11 9,389.60 MWO(5) 13,954.21 86.84 317.78 6,215.29 6,147.29 3,524.28 -10,454.04 6,020,121.31 495,838.34 12.50 9,419.46 MWD(5) 13,986.02 87.94 319.84 6,216.74 6,148.74 3,548.17 -10,474.96 6,020,145.20 495,817.39 7.34 9,451.23 MWD (5) 14,014.23 89.91 320.46 6,217.27 6,14927 3,569.82 -10,493.03 6,020,166.84 495,799.30 7.32 9,47943 MWD(5) 14,044.12 92.55 320.64 6,21663 6,148.63 3,592.89 -10,512.02 6,020,189.89 495,780.30 8.85 9,509.31 MWD (5) 14,074.10 95.07 321.17 6,214.64 6,146.64 3,616.11 -10,530.88 6,020,213.09 495,761.42 8.59 9,539.22 MWD (5) 14,103.49 9614 322.87 6,211.62 6,143.62 3,639.15 -10,548.87 6,020,236.11 495,74341 8.09 9,568.43 MWD 15) 14,134.10 97.08 324.22 6,207.93 6,139.93 3,663.59 -10,566.93 6,020,260.54 495,725.34 4.52 9,598.76 MWD (5) 14,164.21 99.10 324.10 6,203.70 6,1W.70 3.687,76 -10,584.38 6,020,284.68 495,707.87 6.72 9,628.49 MWD (5) 14,194.17 99.28 32596 6,198.91 6,130.91 3,711.99 -10,601.33 6,020,308.90 495,690.90 6.16 9,69.95 MWD (5) 14,224.21 100.84 327.72 6,19366 6,125.66 3,736.75 -10,617.51 6,020,333.64 495,674.70 7.76 9,687.32 MWD (5) 14,244.18 101.21 325.79 6,189.84 6121.84 3,753.14 -10,628.25 6,020,350.03 495,663.94 9.67 9,706.78 MWD (5) 14,280.00 10121 325.79 6,182.88 6,114.88 3,782.20 -10,648.01 6,020,379.08 495,644.16 0.00 9,741.74 PROJECTED to TD Annotation BA ER UGHES 1016/2017 4.1744PM Page 4 COMPASS 5000.14 Build 85 BAF�III E 0 PRINT DISTRIBUTION LIST a GE company COMPANY ConocoPbillips Alaska, l!R C re WELL NAME 3M-27AL2 3 2017 FIELD Greater Kuparuk Area 21 7055 28657 ie sign and return one copy of this transmittal form to: )coPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) G street. DATA LOGGED \'*A'S/201'1 forage, Alaska 99510 M. K. BENDER COUNTY North Slope Borough AO -GCC CC LOG TYPE GR -1 BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Ridera bakerhughes.com LOG DATE September 22, 2017 TODAYS DATE October 11, 201 Revision CD in 217-053 STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FMEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V � � BP North Slope. EOA, PBOC. PRB-20 (Once 109) D&GWO Wells Admin Brenda Glawmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Tom Osterkamp ATO 3-344 700 G Street Anchoraee, AK 99510 3 Exxon Mobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC Attn: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 FIELD FINAL CD/DVD FINAL PRELIMLOGS (las, dlis, PDF, META, I SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 01 01 0 10 0 0 0 0 0 0 5 DNR - Division ofOil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 1 1 1 1 1 10 0 2 3 3 0 ConocoPhillips RECEIVED OCT 13 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2 50-029-22637-61 Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 BER GHES TGE company 21 7055 28657 Project ConocoPhillips w ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 3M Pad MD Reference: Well: 3M-27 North Reference: Wellbore: 3M-27 Survey Calculation Method: Design: 3M-27 Database: Project Kuparuk River Unit, North Slope Alaska, United States (1) Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3M-27 Well Position +N/ -S 0.00 usft Northing: +El -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 3M-27AL2 Magnetics Model Name Sample Date BGGM2017 7/1/2017 Design 3M-27AL2 Audit Notes: Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 6.016,606.24 usft 506,294.30 usft usft Declination (1) 1755 Version: 1.0 Phase: ACTUAL Tie On Depth: 13,384.74 Vertical Section: Depth From (TVD) (usft) 68.00 +N/ -S +E/ -W (usft) (usft) 0,00 0.00 Latitude: Longitude: Ground Level: BAER UGHES 70° 27' 23.753 N 149° 56'55.073 W 0.00 usft Dip Angle Field Strength (1) (nn 80.99 57,497 Direction C) 320.00 10/6/2017 4 19 40P Page 2 COMPASS 5000 14 Build 85 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (310-27) Site: Kupamk 3M Pad MD Reference: 310-27 @ 68.00usft (314-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database- EDT Alaska Sandbox Survey Program Date 9/25/2017 From TO Survey (usR) (-ft) Survey (Wellbore) Tool Name Description Start Date 265.00 12,692.45 3M-27 (3M-27) MWD MWD -Standard 1/15/2001 12,712.50 12,746.03 3M -27A MWD -INC (3M -27A) MWD-INC_ONLY MWD-INC_ONLY_FILLER 8/18/2017 12,778.47 13,145.03 3M -27A MWD (3M -27A) MWD MWD- Stantlard 8/18/2017 13,150.00 13,239.31 3M-27AL2PB1 MWD -INC (3M-27AL2PB1 MWD -INC -ONLY MWD -INC -ONLY -FILLER 8/29/2017 13,270.82 13,384.74 3M-27AL2PBI MWD(3M-27AL2PB1) MWD MWD - Stantlard 8/29/2017 13,415.00 15,409.93 3M-27AL2 MWD(3M-27AL2) MWD MWD - Standard 9/1/2017 Survey Map Map Vertical MD Inc Azi TVD TVDSS+N/S +E/ -W DLS (usR) (1) (1) (usR) (usR) Inert) (usR) Northing Eafill (`1100') Section Survey Tool Name (R) ( (R) (R) 13,384.74 93.22 340.91 6,225.63 6,157.63 3,060.18 -10,137.38 6,019,657.55 496,155.35 18.94 8,860.42 MWD (5) 13,415.00 90.92 333.79 6,224,54 6,156.54 3,088,07 -10,149.02 6,019,685,43 496,143.69 24.71 8,889.27 MWD (6) 13,444.81 93.47 334.19 6,223.40 6,155.40 3,114.84 -10,162.08 6,019,712.18 496,130.61 8.66 8,918.17 MWD (6) _ 13,471.59 95.72 334.05. 6,221.25 6,153.25 3,138.86 -10,173.73 6,019,736.19 496,116.94 8.42 8,944.05 MM (6) 13,499.89 99.19 335.35 6,217.58 6,149.58 3,164.22 -10,185.72 6,019,761.54 496,106.92 13.08 8,971.19 MWD (6) 13,530.39 9640 336.63 6,213.44 6,145.44 3,191.82 -10,198.02 6,019,789.13 496,094.61 10.05 9,000.24 MWO(6) 13,560.61 91.97 337.32 6,211.24 6,143.24 3,219.55 -10,209.80 6,019,816.84 496,082.80 14.63 9,029.05 MWD (6) 13,590.51 89.57 339.15 6,210.84 6,142.84 3,247.32 -10,220.89 6,019,844.60 496,071.70 10.09 9,057.45 MM (6) 13,620.46 88.53 333.98 6,211.33 6,143.33 3,274.78 -10,232.79 6,019.872.05 496,059.77 17.61 9,086.14 MWD (6) 13,650.59 90.52 334.07 6,211.58 6,143.58 3,301.87 -10,245.99 6,019,899.12 496,046.55 6.61 9,115.37 MM (6) 13,680.43 91.81 332.14 6,210.98 6,142.98 3,328.47 -10,259.48 6,019,925.71 496,033.04 7.78 9,144.42 MWD (6) 13,709.92 90.31 329.19 6,210.43 6,142.43 3,354.17 -10,273.93 6,019,951.40 496,018.57 11.22 9,173.40 MVM (6) 13,739.09 89.54 327.68 6,210.47 6,142.47 3,379.02 -10,289.19 6,019,976.23 496,003.28 5.81 9,202.25 MIND (6) 13,770.60 89.23 324.23 6,210.81 6,142.81 3,405.13 -10,306.B3 6,020,002.32 495,985.63 10.99 9,233.58 MWD (6) 13,800.69 88.40 320.11 6.211.43 6,143.43 3,428.68 -10,325.28 6,020,026.06 495,967.16 13.96 9,263.64 MWD (6) 13,830.49 89.63 318.10 6,211.94 6,143.94 3,451.41 -10,344.78 6,020,048.56 495,947.64 7.91 9,293.43 MWD 16) 13,865.07 92.00 315.23 6,21145 6,143.45 3,476.55 -10,368.51 6,020,073.68 495,923.90 10.76 9,327.94 MM (6) 10/62017 4: 19: 40PM Page 3 BAER UGHES Survey End Date 8/18/2017 8/26/2017 8/29/2017 8/31/2017 9/7/2017 Annotation TIP KOP COMPASS 5000.14 Build 85 ConocoPhillips 6AF ERs ConocoPhillips Definitive Survey Report Company: ConocoPhdir s (Alaska) Inc. -Kup2 Local Coordinate Reference: Weil 3M-27 Project: Kuparuk River Unit ND Reference: 31V-27 @ 68,00usft (3M-27) Site: Kupamk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellborn: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Map Map Vertical MD Inc Azi TVD NDSS *NI -S •Ef-W Northing Easting DLS Section Survey Tool Name Annotation (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (ft) 13,893.50 93.63 313.94 6,210.05 6,142.05 3,496.48 -10,368.73 6,020,093.59 495,903.66 7.31 9,356,21 MWD (6) 13,920.70 95.42 312.78 6,207.91 6,139.91 3,515.10 -10,408.44 6,020,112.19 495,883.93 7.83 9,383.14 MWD (6) 13,950.42 96.50 310.62 6,204.82 6,136.82 3,534.76 -10,430.51 6,020,131.83 495,861.85 8.09 9,412.39 MWD (6) 13,980.33 96.69 307.63 6,201.39 6,133.39 3,553.51 -10,453.56 6,020.150.56 495,838.79 9.95 9,441.56 MWD (6) 14,010.54 98.55 305.86 6,197.38 6.129.38 3,571.42 -10,477.55 6,020,168.45 495,814.79 8.46 9.470.71 MWD(6) 14,040.55 99.89 304.85 6,192.57 6,124.57 3,588.56 -10,501,71 6,020,185.57 495,790.62 5.57 9,499.36 MWD(6) 14,070.19 100.54 305.75 6,187.32 6,119.32 3,605.42 -10,525.51 6,020,202.40 495,766.80 3.71 9,527.58 MWD(6) 14,100.45 100.54 309.80 6,181.78 6,113.76 3,623.64 -10,549.02 6,020,220.60 495,743.27 13.16 9,556,65 MWD (6) 14,130.56 100.45 313.75 6,176.29 6,108.29 3,643.36 -10.571.10 6,020,240.30 495,721.19 12.90 9,585,94 MWD(6) 14,160.77 100.25 316,89 6,170.86 6,102.86 3,664.48 -10,59199 6,020,261.41 495,700.28 10.25 9,615.56 MAD (6) 14,190.52 97.66 315.84 6,166.18 6,098.18 3,685.75 -10,612.26 6,020,282.65 495,679.99 8.76 9,644.88 MWD(6) 14,220.91 95.60 317.98 6,162.62 6,094.62 3,707.78 -10,632.88 6,020,304.67 495,659,36 10.21 9,675.01 MWD (6) 14,250.34 95.32 320.33 6,159.82 6,091.82 3,729.94 -10,652.04 6,020,326.81 495,640.18 8.01 9,709.30 MWD(6) 14,280.37 94.33 323.16 6,157.29 6,089.29 3,753.44 -10,670.56 6,020,350.29 495,621.64 9.95 9,734.21 MWD(6) 14,310.34 93.10 326.23 6.155.35 6,087.35 3,777.84 -10,687.84 6,020,37468 495.604.34 11.01 9,764.01 MWD(6) 14,340.62 89.42 326.89 6,154.68 6,086.68 3,803.10 -10,704.52 6,020,399.92 495,587.64 12.35 9,794.08 MWD (6) 14,370.87 87.05 32369 6,155.62 6,087.62 3,827.95 -10,721.73 6.020,424.75 495,570.41 - 13.16 9,824.18 MWD (6) 14,401.12 86.62 320.67 6,157.29 6,089.29 3,851.81 -10,740.25 6,020,446.59 495,551.87 10.07 9,854.36 MWD (6) 14,432.12 85.36 318.73 6,159.45 6,091.45 3,875.39 -10,760.25 6,020,472.15 495,531.85 7.45 9,885.28 MWD(6) 14,461.80 83.91 315.37 6,162.23 6,094.23 3,897.02 -10,780.38 6.020,493.76 495,511.71 12.28 9,914.78 MWD (6) 14,490.30 83.84 312.96 6,165.27 6,097.27 3,916.76 -10,800.71 6,020,513.48 495.491.37 8.41 9,942.97 MWD(6) 14,521.77 83.05 310.58 6,168.86 6,100.86 3,937.58 -10,824.02 6,020,534.28 495,468.04 7.92 9,973.91 MWD(6) 14,550.38 81.46 306.29 6,172.72 6,104]2 3,955.20 -10,846.22 6,020,551.88 495,445.82 15.86 10,001.68 MWD (6) 14,581.83 82,20 303.07 6.177.19 6,109.19 3,972.91 -10,871,82 6,020,569.57 495,420.22 10.40 10,031.70 MWD (6) 14,609.71 84.03 303.40 6,180.53 6,112.53 3,988.08 -10,894.97 6,020,584.72 495.397.05 6.67 10058.20 MWD (6) 14,641.60 85.88 302.36 6.183.34 6,115.34 4,005.33 -10,921.65 6,020,601.94 495,370.37 6.65 10,088.56 MWD (6) 14,670.19 88.71 302.58 6,184.69 6,116.69 4,020.66 -10,945.74 6,020,617.25 495,346.26 9.93 10.115.79 MWD (6) 14,699.34 90.89 301.03 6,184.79 6,116.79 4,036.02 -10,970.51 6,020,632.59 495,321.48 9.18 10,143.48 MWD (6) 14,730.74 92.52 299.80 6,183.85 6,115.86 4,051.91 -10,997.57 6,020,648.45 495,294.41 6.50 10,173.04 MWD (6) 14,761.36 93.82 302.16 6,182.16 6,114.16 4,067.64 -11,023.78 6,020,664.16 495,268.19 8.79 10201.95 MWD (6) 14,791.51 94.15 304.42 6,180.07 6,112.07 4,084.15 -1104892 6 02680,65 495,243.04 7.56 10,23075 MWD (6) Page 4 COMPASS 5000.14 Build 85 10/62017 4 19r40PM ConocoPhillips BAI ER G? ConocoPhillips jUGMES h Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellborn: 3M-27 Design: 3M-27 Survey Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3M-27 310-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (310-27) True Minimum Curvature EDT Alaska Sandbox Map Vertical Easting DLS Section Survey Tool Name (ft) Map MD Inc Azi TVD TVDSS -NIS +E/ -W 495,172.57 17.56 10,317.07 MM (6) 495,149.82 Z56 10,348.02 MWD (6) 495,128.62 9.06 Northing (usft) V) (1) (usft) lush) (usft) (usft) (ft) 14,820.81 95.16 305.80 6,177.69 6.109.69 4,100.95 -11,072.81 6.020.69.42 14,851.46 95.51 307.66 6,174.84 6,106.84 4,119.20 -11097.27 6,020,715.65 14,880.39 93.50 312.34 6,172.56 6,104.57 4,13].73 -11,119.35 6,020,734.16 14,911.60 91.84 314.02 6,171.11 6,103.11 4,159.06 -11,142.09 6,020,755.47 14,991.22 89.23 314.64 6,170.83 6,102.83 4,179.76 -11,163.27 6,020,776.15 14,972.68 91.05 315.14 6,170.76 6,102.76 4,201.96 -11.185.56 6,020,798.33 15,000.05 92.33 315.22 6,169.95 6,101.95 4,221.36 -11,204.84 6,020,817.71 15,030.81 90.71 319.31 6,169.13 6,101.13 4,243.94 -11,225.70 6,020,840.27 15,060.61 92.08 319.59 6,168.41 6,100.41 4,266.58 -11,245.07 6,020,862.89 15,091.12 93.78 320.87 6,166.85 6,098.85 4,290.00 -11,264.55 6,020,886.29 15,115.75 94.50 322.46 6,165.07 6.097.07 4,309.27 -11.279.80 6.020.905.54 15,145.70 95.72 326.54 6,162.40 6,094.40 4,333.55 -11297.12 6,020,929.81 15,175.92 93.20 329.77 6,160.05 6,092.05 4,359.13 -11313.01 6,020,955.38 15,205.68 93.13 331.86 6,158.41 6,090.41 4,385.08 -11,327.50 6,020,981.31 15,235.19 91.99 334.98 6,157.09 6,089.09 4,411.44 -11,340.69 6.021,007.65 15,265.81 92.30 337.45 6,155.94 6,087.94 4,439.43 -11,353.03 6,021,035.64 15,293.51 92.77 339.09 6,154.72 6,086.72 4,465.14 -11,363.27 6,021,061.33 15,320.37 94.12 390.42 6,153.10 6,085.10 4,490.29 -11,372.55 6,021,086.48 15,351.45 95.28 343.37 6,150.56 6,082.56 4,519.73 -11,382.17 6,021,115.90 15,380.13 92.49 34321 6,148.61 6,080.61 4,547.13 -11,390.40 6,021,143.30 15,409.93 92.64 339.44 6,147.28 6,079.28 4.575.33 -11,399.93 6,021,171.48 15,443.00 92.69 33944 6,145.76 6,07736 4,6%.26 -11,411.53 6,021,20240 Well 3M-27 310-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (310-27) True Minimum Curvature EDT Alaska Sandbox Map Vertical Easting DLS Section Survey Tool Name (ft) (-MOO-) (ft) 495,219.13 5.82 10,258.97 MWD(6) 495,194.66 6.15 10,288.67 MWD (6) 495,172.57 17.56 10,317.07 MM (6) 495,149.82 Z56 10,348.02 MWD (6) 495,128.62 9.06 10,377.49 MWD (6) 495,106.31 6.00 10,408.83 MM (6) 495,087.02 4.69 10,436.09 MWD (6) 495,066.14 14.30 10,466.79 MWD (6) 495,046.75 4.69 10,496.58 MWD(6) 495,027.24 6.97 10,527.05 MM (6) 495,011.99 7.07 10551.60 MWD (6) 494,994.65 14.17 10.581.34 MWD(6) 494,978.74 13.53 10,611.15 MWO(6) 494,964.23 7.02 10,640,34 MWD(6) 494951.02 11.25 10,669.01 MWD(6) 494,936.66 8.12 10,698.39 MWD (6) 494,928.40 6.15 10,724.67 MM (6) 494,919.10 7.05 10,749.90 MM (6) 494,909.45 10.17 10,778.64 MWD(6) 494901.20 9.74 10,804.92 MWD (6) 494,891.65 12.65 10,832.64 MM (6) 494,880.02 0.00 10,86379 PROJECTED to TD Annotation 10/62017 4 19 40PM Page 5 COMPASS 5000.14 Build 85 BA_ �. q PRINT DISTRIBUTION LIST UGHES a GE company COMPANY ConocoPhilli s Alaska AtECEIVEr WELL NAME 3M-27AL2PB1 FIELD Greater Kuparuk Area OCT 13 2017 COUNTY North Slope Borough A0GCC BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider@bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 90X) PERSON ATTENTION V I BP North Slope. EOA, PROC. PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Rkvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Tom Osterkamp ATO 3-344 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Attn: Lynda M. Vaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Ann: Maksna Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaslo 99501 ti - 21 7055 28658 ce sign and return one copy of this transmittal form to: xoPhillips Alaska, Inc. Osterkamp (WINS Petroleum Technician6ATA LOGGED G Street. t,04'V201-1 loraee. Alaska 99510 t4. K. BENDER LOG TYPE GR -1 LOG DATE September 22, 2017 TODAYS DATE October 11, 2017 Revision CD in 217-053 Details: Rev. Requested by: -- FIELD/ FINALCD/DVD FINAL PRELIM (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 4 9 4 4 4 9 0 0 0 0 0 5 DNR - Division of0il & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alasla) Inc. Petrotechnical Data Center, LI 900 E. Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 2 3 3 0 ConocoPhillips RECEIVED OCT 13 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL2PB1 60-029-22637-70 Baker Hughes INTEQ Definitive Survey Report 06 October. 2017 BAF�UGHES a GE company 21 7055 28658 ConocoPhillips Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3M-27 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Position +N/S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 3M-27AL2PB1 Magnetics Model Name Sample Date BGGM2016 7/1/2017 Design 3M-27AL2PB7 Audit Notes: Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) (usft) 68.00 Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,016,606.24 usft 506,294.30 usft usft Declination (') 17.53 Tie On Depth: 13,145.03 +N/S +E/ -W (usft) (usft) 0.00 0.00 Latitude: Longitude: Ground Level: 6A�(ER UGHES 700 27' 23.753 N 149° 56' 55.073 W 0,00 usft Dip Angle Field Strength C) (nT) 81.00 57,543 Direction M 320.00 10/62017 4:17:44PM Page 2 COMPASS 5000.14 Build 85 Survey Program Date 9/13/2017 From ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 Q 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Program Date 9/13/2017 From To Survey (usft) Wait) Survey (Wellbore) Tool Name Description Start Date 265.00 12,692.45 3M-27 (3M-27) MWD MWD -Standard 1/15/2001 12712.50 12,746.03 3M -27A MWD -INC (3M -27A) MWD -INC -ONLY MWD -INC -ONLY -FILLER 8/18/2017 12,778.47 13,145.03 3M -27A MWD (3M -27A) MWD MWD -Standard 8/18/2017 13,150.00 13,239.31 3M-27AL2PBI MWD-INC(3M-27AL2PB1 MWD-INC_ONLY MWD -INC -ONLY -FILLER 8/29/2017 13.270.82 14,244.18 3M-27AL2PBI MWD(3M-27AL2PB1) MWD MWD -Standard 8/29/2017 Survey Map Map Vertical MD Inc AN TVD TVDSS +WS +E/•W Northing Easting DLS Section (uett) 0 (•) (waft) (usft) Cush) (uaft) ('1100') gurvey Tool Name (B) (ft) (ft) 13,145.03 W.% 357.79 6,254.37 6,186.37 2,825.51 -10,105.23 6,019,422.93 496,187,70 9.80 8,659.98 MWD (3) 13,150.00 91.05 357.95 6,254.28 6,186.28 2,830.48 -10,105.41 6,019,427.90 496,167.51 3.51 8,663.91 MWD -INC -ONLY (4) 13,179.87 94.73 357.00 6,252.77 6.184.]] 2,860.28 -10,106.73 6.019.457.69 496,186.17 12.72 8.687.58 MWD -INC ONLY(4) 13,209.82 97.43 356.50 6,249.60 6,181.60 2,890.01 -10,108.42 6,019,467.42 496,184.46 9.17 8,711.44 MWD -INC -ONLY (4) 13,239.31 99.64 356.00 6,245.22 61]7.22 2,919.11 -10,110.32 6,019,516.51 496,182.53 7.68 8,734.96 MWD -INC ONLY(4) 13,270.82 99.18 353.77 6,240.07 6,172.07 2,950.07 -10,113.09 6,019,547.47 496,179.73 7.13 8,760.45 MWD (5) 13,299.96 98.28 349.76 6,235.65 6,167.65 2,978.57 -10,117.22 6,019,575.96 496,175.58 13.95 6784.94 MWD(5) 13,324.63 98.09 348.19 6,232.13 6,169.13 3,002.53 -10,121.89 6,019,599.92 496,170.89 6.35 8,806.30 MM (5) 13,354.71 96.76 345.38 6.228.25 6.160.25 3,031.57 -10,128.71 6,019,628.95 496.164.05 10.26 8,832.92 MWD (5) 13,384.74 93.22 340.91 6,225.63 6,157.63 3,060.18 -10,137.38 6,019,657.55 496,155.35 18.94 8,860.42 MWO (5) 13,414.83 90.92 333.79 6,224.54 6156.55 3,087.92 -10,148.95 6,019,685.27 496143.75 24.85 8,889.10 MWD (5) 13,444.07 90.09 329.16 6.224.29 6,156.29 3,113.60 -10,162.91 6,019,710.99 496,129.78 16.09 8,917.75 MWD(5) 13,474.41 91.72 328.42 6,223.81 6,155.81 3,139.59 -10,178.63 6,019,]36.87 496114.04 5.90 8,947.73 MWD(5) 13,504.14 93.04 330.63 6,222.57 6154.57 3,165.14 -10,193.70 6,019,762.45 496,098.95 8.65 8,977.02 MM (5) 13,534.66 95.50 335.29 6,220.30 6,152.30 3,192.24 -10,207.53 6,019,789.54 496,085.10 17.23 9,006.67 MWD(5) 13,565.53 93.16 336.62 6,217.97 6,149.97 3,220.35 -10,220.07 6,019,817.63 496,072.53 8.71 9,036.26 MWD (5) 13,594.77 91.35 337.94 6,216.82 6,148.82 3,247.30 -10,231.35 6,019,844.57 496,061.23 7.66 9,064.16 MWD (5) 13.624.89 91.47 335.35 6216.08 6,148.08 3,274.94 -10,243.29 6,019,672.20 496,049.27 8.61 9,093.01 MWD(5) 13654.51 9178 332.78 621524 6,14724 3,301.56 -10,25624 6019,89881 496,036.30 874 9.12173 MiM)(5) 101612017 4:17 44PM Page 3 IU, ES Survey End Date 8/18/2017 8/26/2017 8/29/2017 8/31/2017 Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth Interpolated Azimuth COMPASS 500014 Build 85 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: n Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (310-27) Site: Kupamk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Annotation U'HES 10/6/2017 4: 17A4PM Page 4 COMPASS 5000.14 Build 85 Map Map Vertical MD Inc Azi TVD TVDSS -NIS +E/ -W Northing Easting DLS Section Survey Tool Name (usft) (°) (`) (usft) (usft) (usft) (usft) (ftl (ft) (•1100•) (ft) 13,684.72 90.21 327.84 6,214.71 6146.71 3,327.79 -10,271.19 6,019,925.02 496,021.33 17.16 9,15143 MM (5) 13,714.82 90.37 324.73 6,274.56 6,146.56 3,352.83 -10,287.90 6,019,950.04 496,004.60 10.35 9,181.35 MWD (5) 13,744.50 90.89 322.34 6,214.23 6,146.23 3,376.69 -10,305.54 6,019,973.89 495.986.95 8.24 9,210.97 MM (5) 13,774.40 90.83 318.27 6,273.78 6,145.78 3,399.69 -10,324.63 6,019,996.87 495,967.84 13.61 9,240.86 MWD(5) 13,804.44 Was 315.23 6,213.33 6,145.33 3,421.57 -10,345.21 6,020,018.72 495,947.24 10.12 9,270.84 MWD (5) 13,834.37 90.98 313.44 6,212.85 6,144.85 3,442.48 -10,366.61 6,020039.62 495.925.82 5.99 9,300.62 MWD (5) 13,864.28 89.54 309.97 6,212.71 6,144.71 3,462.38 -10.388.94 6,020,059.49 495,903.48 12.56 9,330.21 MWD (5) 13,894.20 89.63 312.72 6,212.93 6,144.93 3,482.14 -10,411.40 6,020,079.23 495,881.01 9.20 9,359.79 MWD(5) 13,924.23 87.24 314.05 6,213.75 6,145.75 3,502.76 -10,433.21 6,020,099.83 495,859.18 9.11 9,389.60 MWD (5) 13,954.21 86.84 317.78 6,215.29 6,147.29 3,524.26 -10,454.04 6,020,121.31 495,838.34 12.50 9,41946 MM (5) 13,986.02 BT9 319.84 6,216.74 6,148.74 3,548.17 -10,474.96 6,020,145.20 495,817.39 7.34 9,451.23 MWD(5) 14,014.23 89.91 320.46 6,217.27 6,149.27 3,569.82 -10,493.03 6,020,166.84 495,799.30 7.32 9,479.43 MWD (5) 14,044.12 92.55 320.64 6,216.63 6,148.63 3,592.89 -10,512.02 6,020,189.89 495,780.30 8.85 9,509.31 MWD(5) 14,074.10 95.07 321.17 6.214.64 6,146.64 3,616.11 -10,530.88 6,020,213.09 495,76142 8.59 9,539.22 MWD(5) 14,103.49 96.74 322.87 6,211.62 6,143.62 3,639.15 -10,548.87 6,020,236.11 495,743.41 8.09 9,568.43 MWD(5) 14,134.10 97.08 324.22 6,207.93 6,139.93 3,663.59 -10,566.93 6,020,260.54 495,725.34 4.52 9,598.76 MWD (5) 14,164.21 99.10 324.10 6,203.70 6,135.70 3,687.76 -10,584.38 6,020,284.68 495.707.87 6.72 9,628.49 MWD(5) 14,194.17 99.28 325.96 6,198.91 6,130.91 3,711.99 -10,601.33 6,020,308.90 495,690.90 6.16 9,657.95 MWD (5) 14,224.21 100.84 327.72 6.193.66 6,125.66 3,736.75 -10,617.51 6,020,333.64 495,674.70 7.76 9,687.32 MWD(5) 14,244.18 101.21 325.79 6,189.84 6,121.84 3,753.14 -10,628.25 6,020,350.03 495,663.94 9.67 9,706.78 MWD(5) 14,280.00 101.21 325.79 6,182.88 6,114.88 3,782.20 -10,648.01 6,020,379.06 495,644.16 0.00 9,741.74 PROJECTED to TD Annotation U'HES 10/6/2017 4: 17A4PM Page 4 COMPASS 5000.14 Build 85 THE STATE °fALASKA GOVERNOR BILL WALKER J. Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M-27AL2 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-055 Surface Location: 892' FNL, 1574' FEL, Sec. 25, TUN, R8E, UM Bottomhole Location: 958' FNL, 2887' FEL, Sec. 22, T13N, R8E, UM Dear Mr. Ohlinger: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 217-053, API No. 50-029- 22637-01-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this Zf"dof April, 2017. STATE OF ALASKA A( .A OIL AND GAS CONSERVATION COMN(/ JN PERMIT TO DRILL 20 AAC 25.005 r1Ct0C1V CU APR 11 2017 1 a. Type of Work: Drill ❑ Lateral ❑� Redrill ❑ Reentry ❑ 11b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ Stratigraphic Test ❑ Development - Oil ❑� ' Service- Winj ❑ Single Zone ❑� • Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ 1c. Specify if well is proposed for: Coalbed Gas ❑ Gas Hydrates ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑' , Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180. KRU 3M-27AL2 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 16200' ' TVD: 6130' 1 Kuparuk River Pool / Kuparuk River Oil Pool 4a. Location of Well (Governmental Section): Surface: 892' FNL, 1574' FEL, Sec 25, T13N, R8E, UM 7. Property Designation (Lease Number): a n ADL 355032 d Top of Productive Horizon: 8. Land Use P mit: 13. Approximate Spud Date: 3410' FNL, 1117' FEL, Sec 22, T13N, R8E, UM ALK 3576 4/24/2017 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 958' FNL, 2887' FEL, Sec 22, T13N, RBE, UM c� —54-0& �D `gyp 900' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 68' ' 15. Distance to Nearest Well Open Surface: x- 506294 y- 6016606 Zone- 4 GL Elevation above MSL (ft): 27' , to Same Pool: 5065', 3M-25 16. Deviated wells: Kickoff depth: 13100 feet _ 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 101 degrees Downhole: 4305 ` Surface: 3684 ' 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 2070' 14130' 6195' 16200' 6130' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 13016' 6440' N/A 12926' 6372' 12907' Casing Length Size Cement Volume MD TVD Conductor 121' 16" 200 CF 121' 121' Surface 5928' 9-5/8" 1300 sx AS III, 690 sx Class G 5996' 3465' Production 12938' 7" 200 sx Class G 13006' 6432' Perforation Depth MD (ft): 12696'- 12708', 12724'- 12744', Perforation Depth TVD (ft): 6198'- 6207', 6219'- 6234', 12764'- 12784' 6249'-6264' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis[] Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑� 20 AAC 25.050 requi a ts[A 21. Verbal Approval: Commission Representative: Date Y % /7 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not Keith Herring @ 263-4321 be deviated from without prior written approval. Contact Email Keith. E. Herrinaacop.com Printed Name J. Ohlinger Title Staff CTD Engineer Signature Phone 265-1102 Date1001 Commission Use Only Permit to Drill �CC c_ Number: — WJ API Number: 50- 0, — —�p) —00 Permit Approval f{ Date: — ZO — 1'T See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to explore for, lest, or produce coalbed methanegasgas hydrates, or gas contained in shales: 16 Other: '7 d Samples req'd: Yes E] Nov Mud log req'd: Yesr❑-�/No [o' %�4�` ft,S �Jr/SSvr� 7Z��r Yr p�HzSmeasures: Yes Lys No E] Directional svy mq'd: Yes Lip No❑ Z9_acmge nreq'd: Yes El No L10 Inclination -only svy req'd: Yes E] No rX Post initial injection MIT req'd: Yes ElW LU /5 ranted fc, Q!!ow -i-hc kiCkaff o/tyf fo b�Cfry 7hf rsvl-� 9 y�rntu�a�� ja�'er2?- AHE OVED BY MMISS , {�J// Approved by. COMMISSIONER THE COMMISSION Date: eq y�r3�l� �n (� Submit Form and Form 10-401 (Re sed 11/2015) oil \rf0v[INrArr�onths from the date of approval (20 AAC 25.005(g)) Attachments in Duplicate � ���� u II II vv �� ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 7, 2017 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: i RECEIVE® APR 1 1 2017 A®GCC ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill eight laterals out of the KRU 3M-27 (PTD# 195-214) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin in May 2017. The objective will be to drill the 8 laterals KRU 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M-27AL4, 3M-27AL4-01, and 3M-27AL4-02 targeting the Kuparuk A and C -sands. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: — Permit to Drill Application Forms (10-401) for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 — Detailed Summary of Operations — Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 — Current wellbore schematic — Proposed CTD schematic The application for sundry approval (10-403) for 3M-27 was approved on 3/16/2017. If you have any questions or require additional information, please contact me at 907-263-4321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................2 (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))....................................................................................................................2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2))...................................................................................................................................................2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4))...................................................... .......... --- ........................................................................... 2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................3 7. Diverter System Information..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8))..................................................................................................................................................3 9. Abnormally Pressured Formation Information............................................................................. 4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis...........:.................................................................................................................4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................7 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 7 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................7 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))......................................................................................................................................................7 16. Attachments....................................................................................................................................8 Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02......................................8 Attachment 2: Current Well Schematic for 3M-27...........................................................................................................8 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & A1-4-02 ........................8 Page 1 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AI -4-01, AI -4-02 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M- 27AL3, 3M-27AL4, 3M-27AL4-01, & 3M-27AL4-02. All laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A and C sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M- 27AL4, 3M-27AL4-01, & 3M-27AL4-02. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,290 psi. Using the maximum formation pressure in the area of 4,305 psi in 3M-12 (i.e. 13.4 ppg EMW), the maximum potential surface pressure in 3M-27, assuming a gas gradient of 0.1 psi/ft, would be 3,684 psi., See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3M-27 was measured to be 3,591 psi (11.1 ppg EMW) on 9/5/2016. The maximum downhole pressure in the 3M-27 vicinity is to the southeast in the 3M-12 injector at 4,305 psi (13.4 ppg EMW) from August of 2016. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) None of the offset injection wells to 3M-27 have injected gas, so there is a low probability of encountering free gas while drilling the 3M-27 laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 3M-27 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 3M-27 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 3M -27A 13150' 15200' 6187' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 121' 1640 630 Surface aluminum billet on to 3M-27AL1 13100' 15200' 6190' 6105' 2-3/8", 4.7#, L-80, ST -L slotted liner; 3465' 5750 3090 Production26.0 aluminum billet on to 3M-27AL2 14130' 16200' 6127' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; 7240 5410 Tubing 9.3 aluminum billet on to 3M-27AL2-01 12825' 16200' 6203' 6077' 2-3/8", 4.7#, L-80, ST -L slotted liner; 10540 aluminum billet on to 3M-27AL3 12775' 14375' 6186' 6163' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4 12825' 15200' 6203' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-01 12875' 16200' 6204' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-02 12583' 14375' 6046' 6167' 2-3/8", 4.7#, L-80, ST -L slotted liner; up into 3-1/2" tubing Existing Casing/Liner Information Categoryd3-112" Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 62.5 H-40 Welded 0' 121' 0' 121' 1640 630 Surface 40.0 L-80 BTC 0' 5996' 0' 3465' 5750 3090 Production26.0 L-80 BTC -MOD 0' 13006' 0' 6432' 7240 5410 Tubing 9.3 L-80 EDE 0' 12598' 0' 6125' 10160 10540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System - Window milling operations: Chloride -based FloVis mud (8.6 ppg) - Drilling operations: Chloride -based FloVis mud (8.6 ppg). This mud weight will not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. - Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and wellbore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled Page 3 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 3M-27 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 3M-27 Window (12725' MD, 6220' TVD) Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c) (9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) NIA - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' NID will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 Pumps On 1.5 bpm) Pumps Off A/C -sand Formation Pressure 11.1 3591 psi 3591 psi Mud Hydrostatic 8.6 2782 psi 2782 psi Annular friction i.e. ECD, 0.08psi/ft) 1018 psi 0 psi Mud + ECD Combined no chokepressure) 3800 psi overbalanced -209psi) 2782 psi underbalanced -809psi) Target BHP at Window 11.8 3817 psi 3817 psi Choke Pressure Required to Maintain Target BHP 17 psi 1035 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c) (9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) NIA - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' NID will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 The 3M -27A sidetrack will exit the cement pilot hole at 12725' MD and TD at 15200' MD, targeting the Al sand to the north. It will be completed with 2-3/8" slotted liner from TD up to 13150'MD with an aluminum billet for kicking off the 3M-27AL1 lateral. The 3M-27AL1 lateral will drill to the north to a TD of 15200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 13100' MD with an aluminum billet for kicking off the 3M-27AL2 lateral. The 3M-27AL2 lateral will drill to the west to a TD of 16200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 14130' MD with an aluminum billet for kicking off the 3M-27AL2-01 lateral. The 3M-27AL2-01 lateral will drill to the west to a TD of 16200' MD targeting the A 1 sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL3 lateral. The 3M-27AL3 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12775' MD with an aluminum billet for kicking off the 3M-27AL4 lateral. The 3M-27AL4 lateral will drill to the north to a TD of 15200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL4-01 lateral. The 3M-27AL4-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12875' MD with an aluminum billet for kicking off the 3M-27AL4-02 lateral. The 3M-27AL4-02 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12583' MD. Pre -CTD Work 1. RU Slickline: Obtain SBHP, dummy off gas lift mandrels, and pressure test. 2. RU E -line: Punch 2' of holes in the 3-1/2" tubing tail at 12583' NO. 3. RU Pumping Unit: Perform injectivity test down the tubing. 4. RU Service Coil: Mill out "D" nipple and cement squeeze the A/C -sand perforations up to the holes in the tubing tail. 5. RU Slickline: Tag top of cement and pressure test cement. 6. Prep site for Nabors CDR3-AC rig and set BPV. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 3M -27A Sidetrack (Al sand - north) a. Mill 2.80" high -side pilot hole through the cement to 12755' MD. b. Caliper pilot hole. c. Set top of whipstock at 12725' MD. d. Mill 2.80" window at 12725' MD. e. Drill 3" bi-center lateral to TD of 15200' MD. f. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13150' MD. Page 5 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 3. 3M-27AL1 Lateral (C4 sand -north) a. Kickoff of the aluminum billet at 13150' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13100' MD. 4. 3M-27AL2 Lateral (C4 sand - west) a. Kickoff of the aluminum billet at 13100' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 14130' MD. 5. 3M-27AL2-01 Lateral (Al sand -west) a. Kickoff of the aluminum billet at 14130' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 6. 3M-27AL3 Lateral (Al sand - south) a. Kick off of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12775' MD. 7. 3 M-27AL4 Lateral (Al sand -north) a. Kick off of the aluminum billet at 12775' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 8. 3M-27AL4-01 Lateral (Al sand -west) a. Kick off of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12875' MD. 9. 3M-27AL4-02 Lateral (Al sand -south) a. Kickoff of the aluminum billet at 12875' MD. b. Drill 3" bi-center lateral to TD of 14375' NO. c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 12583' MD. 10. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Pull BPV. 2. Obtain SBHP. 3. Install gas lift design. 4. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. Page 6 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AI -4-01, AI -4-02 - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running - The 3M-27 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 3M -27A 2900' 3M-27AL1 2900' 3M-27AL2 900' 3M-27AL2-01 900' 3M-27AL3 3700' 3M-27AL4 2900' 3M-27AL4-01 900' 3M-27AL4-02 3700' - Distance to Nearest Well within Pool Lateral Name Distance Well 3M -27A _ 2_270' _ 3M-25 3M-27AL1 2270' 3M-25 Page 7 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, AL4-02 3M-27AL2 5065' 31M-25 3M-27AL2-01 5065' 3M-25 3M-27AL3 1508' 3M-23 3M-27AL4 2270' 31M-25 3M-27AL4-01 5065' 3M-25 3M-27AL4-02 1508' 3M-23 16. Attachments Attachment 1: Directional Plans for 310-27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Attachment 2: Current Well Schematic for 3M-27 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Page 8 of 8 April 7, 2016 ConocoPhillips 3M-27 0 Project: Kupamk River Unit Site: KMpamk SM Pad .anMn.wvue xwm M�ImaNm. n.a3• Tp WELLaDRE DETAILS: 3M -2]A REFERENCE INFORMFTION Parent Wellbore: 3M-227 co te(N�E)Re%rez Wd13M3],Twe NoM Well: 3M37 S4.ryY:6/F1GnT Tte on MD: 72892.48 V=I(NM)Releaam: 31A.V@M.WI511(3 2n Wellbore: SM -27A oro Mv�'ar.ao• sm -I@ Rei... Plan: 3M -27A w 97 SM-27pM-27A p � j `J�r[Y` om'mrmn M[hI. BGLMAffi 3W 3M-2]Qe MmrlvW Omn M.M..ft( 13M27) VM Iw CahNalim Meaw4 Miruium tulvalu'e lAtee ri.s BAKER HUGHES West( -)/East(+) (650 ustUin) 3M-27 Proposed CTD Schematic 116" 62# H-40 shoe Cal 121' MD 9-5/8" 36# L-80 shoe @ 5996' MD C -sand perfs 12,696' - 12,708' MD 12,7241- 12,744' MD IA -sand perfs 12,764'- 12,784- MD 7" 26# L-80 shoe @ 13,006' MD 3-1/2" Camco DS Landing Nipple @ 495' MD (ID = 2.875") 3-1/2" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrel @ 3543', 6918', 9762', 11,666', 12,378' Baker CMU Sliding Sleeve @ 12,433' (2.813" ID X -profile) Baker 80-40 PBR @ 12,485' MD (4.00" ID) Baker FHL packer @ 12,498' MD (2.90" ID) X Nipple @ 12,515' MD (2.813" ID) Baker Po -Boy Overshot @ 12,533' MD Camco W Nipple @ 12,550' MD (2.812" ID) Baker PBR @ 12,558' MD (3.00" ID) Baker FHL packer @ 12,571' MD (3.0" ID) 3-1/2" Camco D nipple @ 12,588' MD (ID = 2.75") (Milled out to 2.80" ID for CTD) 3-1/2" tubing tail @ 12,597' MD 3M-27AL3 wp02 (south) TD @ 14,375' MD Liner Billet Q 12,776140 3M-27AL4-01 wpW (wesb TD @ 16,207 MD Liner Billet 12,875'Me 314-27AL4-02 wp00 (south) TD @ 14,376 MD Liner Top @ 12,583Me 3M-27AL2-01 wpol (west) TD@1Qta12. 200' Me L,., Billal 12,625'MD 3W27AL2 wp02 (west) TD @ 16,207 MD Liner W.' 14130' MD M-27AL1 wp01(north) TD @ 15,2W MD Liner Billet13,100- MD 3M -27A wp01 (north) TO @ 15,207 MD Liner Billet @ 13,157 MD ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27 3M-27AL2 Plan: 3M-27AL2_wp02 Standard Planning Report 03 April, 2017 rial BAKER HUGHES ConocoPhillips 3M-27 ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kupamk 3M Pad Well: 3M-27 Wellbore: 3M-27AL2 Design: 3M-27AL2_wP02 ConocoPhillips 3M-27 Planning Report Local Co-ordinate Reference: Well 3M-27 TVD Reference: Mean Sea Level MD Reference: 3M-27 ® 68.00usft (3M-27) North Reference: True Survey Calculation Method: Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor RAN MYXER Site Kupamk 3M Pad Site Position: Northing: 6,016,202.17usft Latitude: 70' 27' 19.780 N From: Map Easting: 506,126.99usft Longitude: 149° 56'59.998 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.05' Well 3M-27 Design 3M-27AL2_wp02 Well Position +N/ -S 0.00 usft Northing: 6,016,606.24 usft Latitude: 70° 27'23753 N Vertical Section: +El -W 0.00 usft Easting: 506,294.30 usft Longitude: 149° 56'55,073 W Position Uncertainty 0.00 0.00 usft Wellhead Elevation: Usk Ground Level: 0.00 usft Wellbore 3M-27AL2 Magnetics Model Name Sample Date Declination Dip Angle Field Strength C) l9 (nT) BGGM2016 7/1/2017 17.53 81.00 57,543 Design 3M-27AL2_wp02 Audit Notes: version: Phase: PLAN Tie On Depth: 13,100.00 Vertical Section: Depth From (TVD) -NIS +E/ -W Direction (usft) (usft) (usft) (`) 0.00 0.00 0.00 320.00 4/372017 2.52:44PM Page 2 COMPASS 5000.1 Build 74 Plan Sections Measured ConocoPhillips ,&Aa. ConocoPhillips Planning Report Dogleg BAKER Turn Depth HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 3M-27 +E/ -W Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level TFO Project: Kuparuk River Unit MD Reference: 3M-27 @ 68.00usft (3M-27) (usft) Site: Kuparuk 3M Pad North Reference: True (-1100ft) Well: 3M-27 Survey Calculation Method: Minimum Curvature 93.44 Wellbore: 3M-27AL2 6,190.04 2,768.99 -10,10440 Design: 3M-27AL2_wp02 0.00 0.00 0.00 Plan Sections Measured ND Below Dogleg Build Turn Depth Inclination Azimuth System +N/ -S +E/ -W Rate Rate Rate TFO (usft) (1 (1 (usft) (usft) (usft) (°/100@) (-1100ft) (°1100ft) V) Target 13,100.00 93.44 35745 6,190.04 2,768.99 -10,10440 0.00 0.00 0.00 0.00 13,200.00 100.02 355.03 6,178.32 2,868.02 -10,110.89 7.00 6.57 -2.43 340.00 13,400.00 90.02 345.18 6,160.82 3,063.78 -10,145.17 7.00 -5.00 4.92 225.00 13,590.00 96.62 333.61 6,149.79 3,240.94 -10,211.72 7.00 3.48 -6.09 300.00 13,790.00 90.16 321.16 6,137.92 3,408.65 -10,319.12 7.00 -3.23 -6.22 243.00 13,950.00 90.16 309.96 6,137.48 3,522.71 -10,430.96 7.00 0.00 -7.00 270.00 14,000.00 90.16 306.46 6,137.34 3,553.63 -10,470.24 7.00 0.00 -7.00 270.00 14,160.00 100.67 310.34 6,122.26 3,652.38 -10,594.91 7.00 6.57 2.42 20.00 14,310.00 95.31 319.46 6,101.37 3,757.13 -10,699.92 7.00 -3.57 6.08 120.00 14,410.00 95.27 326.49 6,092.14 3,836.57 -10,759.85 7.00 -0.04 7.03 90.00 14,620.00 93.58 311.84 6,075.85 3,994.52 -10,896.40 7.00 -0.81 46.97 264.00 14,720.00 89.55 317.57 6,073.12 4,064.79 -10,967.40 7.00 -4.03 5.73 125.00 14,920.00 90.05 331.56 6,073.81 4,227.34 -11,083.06 7.00 0.25 7.00 88.00 15,220.00 90.05 310.56 6,073.55 4,459.38 -11,270.56 7.00 0.00 -7.00 270.00 15,400.00 90.05 323.16 6,073.41 4,590.47 -11,393.39 7.00 0.00 7.00 90.00 15,520.00 90.92 331.52 6,072.39 4,691.40 -11,458.09 7.00 0.73 6.96 84.00 15,820.00 90.86 310.51 6,067.68 4,923.26 -11,645.75 7.00 -0.02 -7.00 270.00 16,120.00 90.80 331.52 6,063.28 5,155.12 -11,833.41 7.00 -0.02 7.00 90.00 16,200.00 90.80 325.91 6,062.16 5,223.45 -11,874.94 7.00 0.00 -7.00 270.00 4/3/2017 2:52 44PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips WGFig ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27AL2 Design: 3M-27AL2_wp02 Planned Survey Measured Depth Inclination (usft) (I 13,100.00 9344 TIPIKOP 13,200.00 100.02 Start 7 dls 13,300.00 95.03 13,400.00 90.02 3 13,500.00 93.51 13,590.00 96.62 4 13,600.00 96.30 13,700.00 93.09 13,790.00 90.16 5 13,800.00 90.16 13,900.00 90.16 13,950.00 90.16 6 14,000.00 90.16 7 14,100.00 96.73 14,160.00 100.67 8 14,200.00 99.26 14,300.00 95.67 14,310.00 95.31 9 14,400.00 95.28 14,410.00 95.27 10 14,500.00 94.58 14,600.00 93.75 14,620.00 93.58 11 14,700.00 90.36 14,720.00 89.55 12 14,800.00 89.75 14,900.00 90.00 14,920.00 90.05 13 15,000.00 90.05 15,100.00 90.05 15,200.00 90.05 15,220.00 90.05 14 15,300.00 90.05 15,400.00 90.05 16 15,500.00 90.78 15,520.00 90.92 7VD Below Azimuth System (°) (usft) 357.45 6,190.04 355.03 6,178.32 350.07 6,165.23 345.18 6,160.82 339.11 6,157.74 333.61 6,149.79 332.98 6,148.66 326.74 6,140.47 321.16 6,137.92 320.46 6,137.89 313.46 6,137.62 309.96 6,137.48 306.46 6,137.34 308.87 6,131.34 310.34 6,122.26 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: +N1 -S +E1 -W (usft) (usft) 2,768.99 -10,104.40 2,868.02 -10,110.89 2,966.26 -10,123.76 3,063.78 -10,145.17 3,158.86 -10,175.80 3,240.94 -10,211.72 3,249.82 -10,216.18 3,335.95 -10,266.20 3,408.65 -10,319.12 3,416.40 -10,325.44 3,489.45 -10,393.64 3,522.71 -10,430.96 3,553.63 -10,470.24 3,614.58 -10,549.22 3,652.38 -10,594.91 Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature Vertical Dogleg Toolface Map Map Section Rate Azimuth Northing Easting (usft) (°1100ft) (°) (usft) (usft) 8,616.15 0.00 0.00 6,019,366.41 496,188.58 8,696.19 7.00 -20.00 6,019,465.43 496,182.00 8,779.72 7.00 -135.00 6,019,563.65 496,169.05 8,868.18 7.00 -135.65 6,019,661.14 496,147.56 8,960.70 7.00 -60.00 6,019,756.18 496,116.86 9,046.67 7.00 -60.19 6,019,838.23 496,080.67 9,056.34 7.00 -117.00 6,019,847.10 496,076.40 9,154.48 7.00 -117.07 6,019,933.18 496,026.31 9,244.18 7.00 -117.58 6,020,005.83 495,973.34 9,254.18 7.00 -90.00 6,020,013.58 495,967.01 9,353.98 7.00 -90.00 6,020,086.55 495,898.75 9,403.45 7.00 -90.02 6,020,119.78 495,861.41 9,452.38 7.00 -90.00 6,020,150.67 495,822.10 9,549.84 7.00 20.00 6,020,211.55 495,743.09 9,608.16 7.00 20.14 6,020,249.30 495,697.37 312.79 6,115.34 3,678.51 -10,624.38 9,647.12 7.00 120.00 6,020,275.41 495,667.88 318.86 6,102.33 3,749.60 -10,693.41 9,745.95 7.00 120.43 6,020,346.43 495,598.79 319.46 6,101.37 3,757.13 -10,699.92 9,755.90 7.00 121.21 6,020,353.95 495,592.28 325.78 6,093.06 3,828.30 -10,754.30 9,845.38 7.00 90.00 6,020,425.07 495,537.85 326.49 6,092.14 3,836.57 -10,759.85 9,855.28 7.00 90.58 6,020,433.33 495,532.29 320.20 6,084.41 3,908.47 -10,813.35 9,944.75 7.00 -96.00 6,020,505.18 495,273.51 495,478.73 313.23 6,077.13 3,981.02 -10,881.69 10,044.26 7.00 -96.54 6,020,577.67 331.56 495,410.34 311.84 6,075.85 3,994.52 -10,896.40 10,064.05 7.00 -97.05 6,020,591.15 6,073.74 495,395.62 316.43 6,073.10 4,050.17 -10,953.76 10,143.55 7.00 125.00 6,020,646.75 4,374.96 495,338.22 317.57 6,073.12 4,064.79 -10,967.40 10,163.52 7.00 125.16 6,020,661.36 -11,255.52 495,324.57 323.17 6,073.60 4,126.38 -11,018.41 10,243.49 7.00 88.00 6,020,722.90 495,273.51 330.16 6,073.82 4,209.88 -11,073.33 10,342.75 7.00 87.97 6,020,806.34 495,218.53 331.56 6,073.81 4,227.34 -11,083.06 10,362.39 7.00 87.95 6,020,823.80 495,208.78 325.96 6,073.74 4,295.72 -11,124.54 10,441.43 7.00 -90.00 6,020,892.13 495,167.25 318.96 6,073.65 4,374.96 -11,185.43 10,541.27 7.00 -90.00 6,020,971.31 495,106.30 311.96 6,073.57 4,446.20 -11,255.52 10,640.90 7.00 -90.01 6,021,042.48 495,036.15 310.56 6,073.55 4,459.38 -11,270.56 10,660.66 7.00 -90.02 6,021,055.66 495,021.10 316.16 6,073.49 4,514.29 -11,328.70 10,740.09 7.00 90.00 6,021,110.51 494,962.92 323.16 6,073.41 4,590.47 -11,393.39 10,840.03 7.00 90.00 6,021,186.62 494,898.18 330.12 6,072.69 4,673.94 -11,448.34 10,939.29 7.00 84.00 6,021,270.04 494,843.16 331.52 6,072.39 4,691.40 -11,458.09 10,958.94 7.00 84.05 6,021,287.49 494,833.40 4/312017 2:52:44PM Page 4 COMPASS 5000.1 Bu1W 74 ConocoPhillips RAN ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc.-Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27AL2 Design: 3M-27AL2_wP02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/ -B +El -W Section Rate Azimuth Northing Easting (usft) (°) (.) (usft) (usft) (usft) (usft) (°1100ft) (°) (usft) (usft) 15,600.00 90.92 325.92 6,071.11 4,759.73 -11,499.61 11,037.97 7A0 -90.00 6,021,355.78 494,791.82 15,700.00 90.90 318.91 6,069.52 4,838.91 -11,560.56 11,137.81 7.00 -90.09 6,021,434.90 494,730.81 15,800.00 90.87 311.91 6,067.98 4,910.08 -11,630.71 11,237.41 7.00 -90.20 6,021,506.00 494,660.61 15,820.00 90.86 310.51 6,067.68 4,923.26 -11,645.75 11,257.18 7.00 -90.31 6,021,519.16 494,645.56 17 15,900.00 90.86 316.11 6,066.48 4,978.11 -11,703.93 11,336.59 7.00 90.00 6,021,573.96 494,587.34 16,000.00 90.84 323.11 6,065.00 5,054.22 -11,768.67 11,436.52 7.00 90.08 6,021,650.01 494,522.54 16,100.00 90.81 330.12 6,063.56 5,137.66 -11,823.66 11,535.78 7.00 90.19 6,021,733.40 494,467.48 16,120.00 90.80 331.52 6,063.28 5,155.12 -11,833.41 11,555.42 7.00 90.29 6,021,750.64 494,457.72 18 16,200.00 90.80 325.91 6,062.16 5,223.45 -11,874.94 11,634.46 7.00 -90.00 6,021,819.14 494,416.14 Planned TD at 16200.00 4/3/2017 2:52:44PM Page 5 COMPASS 5000.1 Build 74 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature FSaI HUGHES Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NI -S +E/ -W Northing Easting -Shape (I (I (usft) (usft) (usft) (usft) (usft) Latitude Longitude 3M-27AL2_T06 0.00 0.00 6,062.00 4,011.961,128,270.27 6,021,571.00 1,634,448.00 ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27AL2 Design: 3M-27AL2_wp02 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature FSaI HUGHES Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD +NI -S +E/ -W Northing Easting -Shape (I (I (usft) (usft) (usft) (usft) (usft) Latitude Longitude 3M-27AL2_T06 0.00 0.00 6,062.00 4,011.961,128,270.27 6,021,571.00 1,634,448.00 70" 14'8.281 N 140'48'37+937 W - plan misses target center by 1138375.35usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - plan misses target center by 1139500.55usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Polygon - Point - Polygon Point 6,183.00 1.00 1.00 6,018,657.00 3M-27A_Faultl 0.00 0.00 6,158.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 70° 13'50.989 N 140° 47' 43.316 W - plan misses target center by 1140499.67usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) 0.00 6,017,571.00 - Polygon 0.00 1,549.65 Point 1 6,158.00 0.00 0.00 6,020,114.00 1,636,574.00 Point Point 6,158.00 1.00 1.00 6,020,115.00 1,636,575.00 1,066.14 3M-27AL3_Fauh2 0.00 0.00 6,188.00 629.171,129,993.58 6,018,190.00 1,636,174.00 70° 13'32.900 N 140'48'3.201 W - plan misses target center by 1140099.99usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) 899.40 6,017,960.05 - Polygon 0.00 -90.36 Point 6,188.00 0.00 0.00 6,018,190.00 1,636,174.00 Point Point 6,188.00 1.00 1.00 6,018,191.00 1,636,175.00 0.00 3M-27AL2_T02 0.00 0.00 6,145.00 1,924.311,129,977.68 6,019,485.00 1,636,157.00 - plan misses target center by 1140082.39usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) Point 3M-27AL3_Fault2 M 0.00 0.00 0.00 629.171,129,993.58 6,018,190.00 1,636,174.00 - plan misses target center by 1140116.79us1t at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Rectangle (sides W1,500.00 H1.00 D0.00) 3M-27AL2_T03 0.00 0.00 6,138.00 2,304.571,129,721.97 6,019,865.00 1,635,901.00 - plan misses target center by 1139826.47usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Point 3M-27 CTD Polygon Sot 0.00 0.00 0.00 10.631,129,376.00 6,017,571.00 - plan misses target center by 1139500.55usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Polygon TVD, 2768.99 N, -10104.40 E) - Polygon Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 Point 1 0.00 0.00 0.00 6,017,571.00 Point 0.00 1,549.65 635.29 6,019,121.03 Point 0.00 1,306.29 1,066.14 6,018,878.06 Point 0.00 388.33 899.40 6,017,960.05 Point 0.00 -90.36 437.97 6,017,481.02 Point 0.00 0.00 0.00 6,017,571.00 3M-27 CTD Polygon We 0.00 0.00 0.00 4,589.101,128,180.75 6,022,148.00 - plan misses target center by 1138303.43usit at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Polygon Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 3M-27AL2_Tot 0.00 0.00 6,172.00 1,779.271,130,016.56 6,019,340.00 1,636,196.00 70"13'44.033N 140°47'57.543 Point 1 0.00 0.00 0.00 6,022,148.00 Point 0.00 -2,757.14 2,351.05 6,019,393.12 Point 0.00 -3,440.92 1,991.47 6,018,709.11 Point 0.00 -2,499.35 1,383.16 6,019,650.07 Point 0.00 436.73 -394.39 6,021,710.98 Point 0.00 0.00 0.00 6,022,148.00 1,635,557.00 1,635,557.00 1,636,190.92 1,636,621.93 1,636,455.98 1,635,995.00 1,635,557.00 1,634,358.00 1,634,358.00 1,636,711.14 1,636,352.18 1,635,743.13 1,633,964.02 1,634,358.00 70' 13'45.499 N 140° 47'5&028 W 70° 13' 32.900 N 140° 48'3.201 W 70" 13'49.567 N 140° 48'3.709 W 70° 13'27.802 N 140' 48'23.598 W 70° 14' 14.017 N 140" 48' 3M-27AL3_Faultt 0.00 0.00 6,183.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70° 13'37,414 N 140° 48'0.963 - plan misses target center by 1140106.61 usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Polygon Point 1 6,183.00 0.00 0.00 6,018,656.00 1,636,181.00 Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 3M-27AL2_Tot 0.00 0.00 6,172.00 1,779.271,130,016.56 6,019,340.00 1,636,196.00 70"13'44.033N 140°47'57.543 - plan misses target center by 1140121.39usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Point 3M-27AL2_T04 0.00 0.00 6,099.00 2,564.841,129,429.16 6,020,125.00 1,635,608.00 70° 13'52.525 N 140' 48' - plan misses target center by 1139533.58usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) - Point 4/30017 2:52:44PM Page 6 COMPASS 5000.1 Build 74 ConocoPhillips MAP F&I hiiiips ConocoPPlanning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kupawk 3M Pad Well: 3M-27 Wellbore: 3M-27AL2 Design: 3 M-27AL2_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (310-27) True Minimum Curvature -plan misses target center by 1140516.47usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 t) Vertical -Rectangle (sides W1,500.00 H1.00 D0.00) Hole 3M-27AL2 T05 0.00 0.00 6,073.00 2,839.071,129,191.37 6,020,399.00 1,635,370.00 70° 13' 55.538 N 140' 48' 16.607 W - plan misses target center by 1139295.7Busft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) Diameter - Point (usft) Name 3M-27 CTD Polygon Noi 0.00 0.00 0.00 3,355.381,131,253.01 6,020,917.00 1,637,431.00 70° 13' 57.516 N 140° 47' 15.219 W - plan misses target center by 1141374.35usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) 6,062.16 23/8" - Polygon 3.000 Point 0.00 0.00 0.00 6,020,917.00 1,637,431.00 Point 0.00 -2,146.46 -952.80 6,018,769.95 1,636,480.11 Point 0.00 -1,769.89 -1,622.57 6,019,145.92 1,635,810.09 Point 0.00 328.43 -503.79 6,021,244.97 1,636,926.98 Point 5 0.00 0.00 0.00 6,020,917.00 1,637,431.00 3M-27AL3_Faultl_M 0.00 0.00 0.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70° 13'37.414 N 140° 48'0.963 W - plan misses target center by 1140123.41 usft at 13100.00usft MD (6190.04 TVD, 2768.99 N, -10104.40 E) 13,590.00 - Rectangle (sides W1,500.00 H1.00 D0.00) 3,240.94 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (In) 16,200.00 6,062.16 23/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +EI -W (usft) (usft) (usft) (usft) Comment 13,100.00 6,190.04 2768.99 -10,104.40 TIP/KOP 13,200.00 6,178.32 2,868.02 -10,110.89 Start 7 dls 13,400.00 6,160.82 3,063.78 -10,145.17 3 13,590.00 6,149.79 3,240.94 -10,211.72 4 13,790.00 6,137.92 3,408.65 -10,319.12 5 13,950.00 6,137.48 3,522.71 -10,430.96 6 14,000.00 6,137.34 3,553.63 -10,470.24 7 14,160.00 6,122.26 3,652.38 -10,594.91 B 14,310.00 6,101.37 3,757.13 -10,699.92 9 14,410.00 6,092.14 3,836.57 -10,759.85 10 14,620.00 6,075.85 3,994.52 -10,896.40 11 14,720.00 6,073.12 4,064.79 -10,967.40 12 14,920.00 6,073.81 4,227.34 -11,083.06 13 15,220.00 6,073.55 4,459.38 -11,270.56 14 15,400.00 6,073.41 4,590.47 -11,393.39 15 15,520.00 6,072.39 4,691.40 -11,458.09 16 15,820.00 6,067.68 4,923.26 -11,645.75 17 16,120.00 6,063.28 5,155.12 -11,833.41 18 16,200.00 6,062.16 5,223.45 -11,874.94 Planned TD at 16200.00 4/3/2017 2:52:44PM Page 7 COMPASS 5000.1 Build 74 Baker Hughes INTEQ rias ConocoPhillips Travelling Cylinder Report BAKER HUGHES Company: ConocoPhillips (Alaska) Inc. -KII Project: Kuparuk River Unit Reference Site: Kuparuk 3M Pad Site Error: 0.00 usft Reference Well: 3M-27 Well Error: 0.00 usft Reference Wellbore 3M-27AL2 Reference Design: 3M-27AL2_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3M-27 3M-27 fid- 68,00usft (3M-27) 3M-27 @ 68.00usft (310-27) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference 3M-27AL2_wp02 Casing Hole Filter type: GLOBAL FILTER APPLIED: All wellpaths within 2004 100/1000 of reference To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 13,100.00 to 16,200.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,813.20 usft Error Surface: Elliptical Conic Survey Tool Program Date 3/30/2017 Casing Hole Depth From To (usft) (usft) Name (usft) (usft) Survey (Wellbore) Tool Name Description 265.00 12,692.45 3M-27 (3M-27) MWD MWD - Standard 12,692.45 13,100.00 3M-27A_wp01 (3M -27A) MWD MWD -Standard 13,100.00 16,200.00 3M-27AL2_wp02(3M-27AL2) MWD MWD -Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name Reference 13,016.00 6,263.85 95/8" 9-5/8 12-1/4 16,200.00 6,130.16 2 3/8" 2-3/8 3 Summary Kuparuk 3M Pad -3M-27-3M-27A-3M-27A_wp01 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Kuparuk 3M Pad Measured vertical Measured Va...] Reference Offset Toolface+ 3M-14-3M-14AL2-3M-14AL2 wp06 Centre Casing- Centre to No Go Allowable Out of range 3M-14-3M-14AL3-3M-14AL3 wp00 Depth Depth Depth Depth Out of range 3M-17 - 3M-17 - 3M-17 +EI -w Hole Size Centre Distance DevlatlI Out of range 3M-18 - 3M-18 - 3M-18 had!) (usft) hen) haft) loan) (ian) Out of range 3M-25 - 3M-25 - 3M-25 loan) 1") (torm (unit) (affil Out of range 3M-26 - 3M-26 - 3M-26 11124.98 6,256.18 13,125,00 6,25661 026 028 Out of range 3M-27-3M-27A-3M-27A_wp01 13,124.98 13,125.00 0.66 0.89 -0.04 FAIL - Minor 1/10 3M-27 - 3W27AL1 - 3M-27AL1_wp01 13,124.98 13,125.00 0.66 0.89 -0.04 FAIL - Minor 1/10 3M-27 - 3M-27AL2-01 - 3M-27AL2-01_wp01 14,150.00 14,150.00 0.46 0.82 0.12 Pass - Minor 1/10 3M-27-3M-27AL4-3M-27AL4_wp00 13,100.00 13,100.00 0.00 1.40 -0.22 FAIL - Minor 1/10 3M-27-3M-27AL4-01- 3M-27AL4-01_wp00 13,100.00 13,100.00 0.00 1.40 -0.22 FAIL - Minor 1/10 Offset Design Kuparuk 3M Pad -3M-27-3M-27A-3M-27A_wp01 anent sm E. 0.00 an Survey Program: 265-10WD, 12692 -MWD Rule Assigned: Minor 1110 Mast Well Evor. 0.00 usft Referents ONatt send Maar Aide Measured vertical Measured Va...] Reference Offset Toolface+ Offset Wellbore Centre Casing- Centre to No Go Allowable Waning Depth Depth Depth Depth Azinutb +N1.S +EI -w Hole Size Centre Distance DevlatlI had!) (usft) hen) haft) loan) (ian) (°) (uef) loan) 1") (torm (unit) (affil 11124.98 6,256.18 13,125,00 6,25661 026 028 127,04 2.793.93 -10.105.13 2-11116 066 0.89 0.04 FAIL- Minor lit 0, CC. ES, SF 13,14986 6,253.62 13150.00 6,255.31 053 0.52 12635 2.918.90 -10.105.12 2-11116 265 1.22 163 Pass Minorl110 13.174.53 6,250.39 13,175.00 6254.16 0.77 0.78 125.81 2,943.86 -10,10435 2-11/16 5.94 140 472 Pass - Minor 1110 13,198.89 6,248.52 13,200.00 6,253.16 102 104 124.84 2.86679 -10,102.83 2-11/16 10.53 1.45 9.23 Pass - Minor 1110 13,223.20 x24252 13,225.00 6,25225 126 129 121.47 2.893.67 -10,10056 2-11/16 16.13 1.47 14.89 Pass - Minor 1110 13,247.25 6,239.06 13,250.00 6,251.39 1.51 155 116.27 2,91947 -10,091 2-11/16 22.48 147 2185 Pass - Minor IIID 13.270,93 6,236.14 13,275.00 6,250.59 136 180 110.80 2,943.17 -10,09375 2-11116 2871 147 2849 Pass - Minor 1110 CC - Min centre to center distance or covergent point SF - min separation factor, ES - min ellipse separation 3/302017 4:32:03PM Page 2 COMPASS 5000.1 Build 74 ConocoPPhillips Project Nuparuk River Unit Site: Kuparuk 3M Pad Axlmulln to 7- was uaanem No:m: ns+ We:.uo Fau WELLBORE DETAILS: 3M-27AL2 REFERENCE INFORAWTIM Parent Wellbore: 3M -2]A coa4ireL(wi7 Relewnn: wet )M@; T. Nom Well: 3M-27 Sl�neln A6a2&n Tie on MD: 131 D0.00 Vekel(TVD) Rekmno, Wan Sw LwN Wellbore: 3M.27AL2 wRMala: atm. Latitude Swra NS) R,h.nu Sbl-P.WN.OAOD Plan: 3M.27AL2_wp02 (3M.27/3M-27AL2) Nm�"edc+4mi 6016606.24 Wa-w Omm RNerence: 3M 21®aS.00wa3 n 70° 27' 23.753 N 149° 56' 55.073 W Sec MD Caculetion MCNod Minimum CurnW:a F Mean 6400 6000 5600 200 4800 94400t Z 4000 0 :s3600 G 3200 0 �zaoo 2400 0 N2000 600 200 800 rias H GMS I.........■■■....... 'I■i�i�I���V\®�'i■11■��ii WELL DETAILS: 3M-27 +N/ -S +E/ -W Northing Easting Latitude Longitude 0.00 0.00 6016606.24 506294.30 70° 27' 23.753 N 149° 56' 55.073 W Sec MD Inc Azi TOSS +N/ -S +E/ -W Dleg TFace VSect Annotation 1 13100.00 93.44 357.45 6190.04 2768.99-10104.40 0.00 0.00 8616.15 TIP/KOP 2 13200.00 100.02 355.03 6178.32 2868.02-10110.89 7.00 340.00 8696.19 Start 7 dAs 3 13400.00 90.02 345.18 6160.82 3063.78-10145.17 7.00 225.00 8866.18 3 4 13590.00 96.62 333.61 6149.79 3240.94-10211.72 7.00 300.00 9046.67 4 5 13790.00 90.16 321.16 6137.92 3408.65-10319.12 7.00 243.00 9244.18 5 6 13950.00 90.16 309.96 6137.48 3522.71-10430.96 7.00 270.00 9403.45 6 7 14000.00 90.16 306.46 6137.34 3553.63-10470.24 7.00 270.00 9452.38 7 B 14160.00 100.67 310.34 6122.26 3652.38-10594.91 7.00 20.00 9608.16 8 9 14310.00 95.31 319.46 6101.37 3757.13-10699.92 7.00 120.00 9755.90 9 10 14410.00 95.27 326.49 6092.14 3836.57-10759.85 7.00 90.00 9855.28 10 11 14620.00 93.58 311.84 6075.85 3994.52-10896.40 7.00 264.0010064.05 11 12 14720.00 89.55 317.57 6073.12 4064.79-10967.40 7.00 125.0010163.52 12 13 14920.00 90.05 331.56 6073.81 4227.34-11083.06 7.00 68.0010362.39 13 1415220.00 90.05 310.56 6073.55 4459.38-11270.56 7.00 270.0010660.66 14 15 15400.00 90.05 323.16 6073.41 4590.47-11393.39 7.00 90.0010840.03 15 1615520.00 90.92 331.52 6072.39 4691.40-11458.09 7.00 84.0010958.94 16 17 15820.00 90.86 310.51 6067.68 4923.26-11645.75 7.00 270.0011257.18 17 1816120.00 90.80 331.52 6063.28 5155.12-11833.41 7.00 90.0011555.42 18 19 16200.00 90.80 325.91 6062.16 5223.45-11874.94 7.00 270.0011634.46 Planned TD at 16200.00 F Mean 6400 6000 5600 200 4800 94400t Z 4000 0 :s3600 G 3200 0 �zaoo 2400 0 N2000 600 200 800 rias H GMS I.........■■■....... 'I■i�i�I���V\®�'i■11■��ii West( -)/East(+) (400 us in) 5605 H 5700 1■■� ' J F a 5795 -2713 -2]A 1 F ■■ ■ 6 � ■ORTTAI�II- MME■■, m eagman L=? .4 Plan ed Me ai 16210 GO -140W-13600-13200-12800-12400-12000-11600-11200-10800-10400-10000.9600 .9200 .8800 .8400 .8000 -7600 -7200 -6800 Sea West( -)/East(+) (400 us in) 5605 H 5700 ' J F a 5795 -2713 -2]A 1 F 6 � m 5890 L=? .4 Plan ed Me ai 16210 GO 3 -17/d -27 2 5985 M-27 M-27 % 1�1-27 M-27 6080 - - 3MI 2L3M 'JAI. 6175 ......_ 9 17 q5 7 8 3 -27/ -27A 01 6270 TIP #L3 6365 34-273h -27A .01 6460 MR].]3FtWtI 3M-2 - Fa Itl 6555 L 8170 8265 8360 8455 8550 8645 8740 8835 8930 9025 9120 9215 9310 9405 9500 9595 9690 9785 9880 9975 10070 10165 10260 10355 10450 10545 10640 10735 10830 10925 11020 11115 11210 11305 11400 11495 11590 11685 11780 Vertical Section at 320.000 (95 usft/in) TRANSMITTAL LETTER CHECKLIST WELL NAME: &I u-S3m �� / PTD: a 17- - OS V Development Service Exploratory _ Stratigraphic Test —Non -Conventional FIELD: LL2mv- POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. Q 17 - OS3 API No. 50-�_- �2 3 -�- a q (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50— from from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Comnanv Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name l has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.07 ] (a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name l in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(dX2XB) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 212015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 PTD#:2170550 Company CONOCOPHILLIPS ALASKA INC _ __. _ ._ Initial Class/Type Well Name: KUPARUK RIV UNIT 3M-27AL2 Program DEV_ _ Well bore seg J DEV1 PEND GeoArea 690 _ Unit 11160 _ On/Off Shore On Annular Disposal `. Administration 1 Permit fee attached _ NA _ 2 Lease number appropriate _ Yes ADL0025523, Surf Loc; ADL0025522, Portion of well; ADL0355032, Top Prod &. TD.. 3 Unique well name and number Yes KRU 3M-27AL2 _ 4 Well located in. a. defined pool... _ Yes KUPARUK RIVER,. KUPARUK RIV OIL - 490100, governed. by Conservation. Order No. 432D. 5 Well located proper distance from drilling unit. boundary Yes CO 432D contains no spacing restrictions with respect to drilling unit boundaries. 6 Well located proper distance from other wells_ _ Yes CO 4320 has no interwellspacing .restrictions. 7 Sufficient acreage available in. drilling unit. _ Yes _ 8 If deviated, is wellbore plat. included Yes 9 Operator only affected party _ Yes Wellbore will be more than 500' from an external property line where ownership or landownership changes. 10 Operator has. appropriate bond in force Yes 11 Permit can be issued without conservation order _ Yes Appr Date 12 Permit can be issued without administrative. approval Yes 13 Can permit be approved before 15-day wait _ Yes PKB 4/13/2017 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA _ 15 All wells. within 1/4 mile area of review identified (For service well only) NA _ 16 Pre-produced injector; duration of pre-production less than 3 months (For service well only) NA _ 17 Nonconven. gas conforms to AS31.05.0300. 1.A),(j.2.A-D) NA _ - 18 Conductor string provided NA _ Conductor set in KRU 310-27 Engineering 19 Surface casing protects all known USDWs NA Surface casing set in KRU 3M-27 20 CMT vol adequate to circulate. on conductor & surf csg NA Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons. No Productive interval will be completed with slotted liner 23 Casing designs adequate for C, T, B &. permafrost Yes 24 Adequate tankage. or reserve pit _ Yes Rig has steel tanks; all. waste to approved disposal wells 25 If a re-drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation proposed _ Yes Anti-collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling fluid. program schematic & equip list adequate Yes Max formation pressure is 4305 psig(13.4 ppg. EMW); will drill w/ 8.6. ppg EMW and. maintain overbal w/ MPD VTL 4/21/2017 29 BOPEs, do they meet. regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 3684 psig; will test BOPS to 4200 psig 31 Choke manifold complies w/API RP-53 (May 84). Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2$ gas probable Yes 112S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA _ 35 Permit can be issued w/o hydrogen sulfide measures No Wells on 3M-Pad are H2S-bearing. H2S measures required. Geology 36 Data presented on potential overpressure zones Yes Max. potential. reservoir pressure is 13.4 ppg EMW; will be drilled using 8.6. ppg mud and MPD technique. Appr Date 37 Seismic. analysis of shallow gas zones NA PKB 4/13/2017 38 Seabed condition survey (if off-shore) NA 39 Contact name/phone for weekly progress reports [exploratory only] NA Onshore development lateral to be drilled. Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date �_ LtIzslt�