Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout217-057DATA SUBMITTAL COMPLIANCE REPORT
12/28/2017
Permit to Drill
2170570 Well Name/No. KUPARUK RIV UNIT 3M-27AL3 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-63-00
MD
14427
TVD 6232 Completion Date
9/23/2017 Completion Status 1 -OIL
Current Status 1 -OIL UIC No
REQUIRED
INFORMATION
✓
Mud Log
Samples No
Directional Survey Yes
DATA
INFORMATION
Types
Electric or Other Logs Run: GR/Res
(data taken from Logs Portion of Master Well Data Maint)
Well Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OH/
Type
Med/Frmt Number Name
Scale Media No Start Stop CH
Received
Comments
ED
C
28660 Digital Data
12580 14427
10/13/2017
Electronic Data Set, Filename: 3M-27AL3
GAMMA RES.Ias
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3H-27AL3 21VID Final.cgrr-
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3H-27AL3 SMD Final.cgrm
ED
C
28660 Digital Data
10/13/2017
Electronic File; 3H-27AL3 5TVDSS Final.cgm ,
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3H-27AL3 21VID Final.pdf .
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3H-27AL3 51VID Final.pdf ,
ED
C
28660 Digital Data
-
10/13/2017
Electronic File: 3H-27AL3 5TVDSS Final.pdf -
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3 EOW - NAD27.pdf,
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3 EOW - NAD27.txt,
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3 Final Surveys TD-
14427.csv
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3 Final Surveys TD.
14427.xlsx
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3 Survey Listing.txt -
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3 Surveys.txt .
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-
27AL3_25 tapescan_BHI_CTK.txt
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-
27AL3_5_tapescan_BHI_CTK.txt .
ED
C
28660 Digital Data
10/13/2017
Electronic File: 3M-27AL3_output.tap ,
ED
C
28660 Digital Data
-
10/13/2017
Electronic File: 3H-27AL3 21VID Final.tif ,
ED
C
28660 Digital Data
1 011 3/2 01 7
Electronic File: 3H-27AL3 51VID Final.tif ,
AOGCC
Page 1 of 2
- Thursday, December 28, 2017
DATA SUBMITTAL COMPLIANCE REPORT
12/28/2017
Permit to Drill
2170570 Well Name/No. KUPARUK RIV UNIT 3M-27AL3 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029-22637-63-00
MD
14427
TVD 6232 Completion Date 9/23/2017
Completion Status 1 -OIL Current Status 1 -OIL UIC No
ED
C
28660 Digital Data
10/13/2017
Electronic File: 311-27AL3 5TVDSS Final.tif-
Log
C
28660 Log Header Scans
0 0
2170570 KUPARUK RIV UNIT 3M-27AL3 LOG
HEADERS
ED
C
28685 Digital Data
10/16/2017
Electronic File: 3M-27AL3 EOW - NA027.pdf'
ED
C
28685 Digital Data
10/16/2017
Electronic File: 3M-27AL3 EOW - NAD27.txt
Log
C
28685 Log Header Scans
0 0
2170570 KUPARUK RIV UNIT 3M-27AL3 LOG
HEADERS
Well Cores/Samples
Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED/�1
Core Chips Y /SIA )
Completion Report �X
Directional / Inclination Data (tY,
Production Test Informatioryo NA
Mechanical Integrity Test Information YY
Geologic Markers/Tops 1r /
Daily Operations Summary
COMPLIANCE HISTORY
Completion Date: 9/23/2017
Release Date: 4/25/2017
Description
Comments:
Compliance Reviewed By:
Date Comments
Mud Logs, Image Files, Digital Data Y V
Core Chips Y /SIA )
Composite Logs, Image, Data Files,9
Core Photographs Y / A/
Cuttings Samples Y / No
Laboratory Analyses Y/A
Date:
AOGCC Page of 2 Thursday, December 28, 2017
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMIISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: Oil ❑✓ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG[] WDSPL ❑ No. of Completions:
1b. Well Class:
Development ❑✓ Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Abend.: 9/23/2017
14. Permit to Drill Number/ Sundry:
217-057
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
9/21/2017
15. API Number:
50-029-22637.63-00
4a. Location of Well (Governmental Section):
Surface: 892' FNL, 1574' FEL, Sec 25, T13N, R8E, UM
Top of Productive Interval:
3620' FNL, 983' FEL, Sec 22, T1 3N, R8E, UM
Total Depth:
4966' FNL, 1504' FEL, Sec 22, T1 3N, R8E, UM
8. Date TO Reached:
9/22/2017
16. Well Name and Number:
KRU 3M-27AL3 -
9. Ref Elevations: KB: 68
GL: 27 BF:
17. Field / Pool(s):
Kuparuk River Field/Kuparuk Oil Pool
10. Plug Back Depth MD/TVD:
N/A
18. Property Designation:
ADL 25523, ADL 355032, ADL 25522'
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 506294 y- 6016605 Zone- 4
TPI: x- 496323 y- 6019156 Zone- 4
Total Depth: x- 495804 y- 6017811 Zone- 4
11. Total Depth MD/TVD:
1442776232'
19, DNR Approval Number.
931813000
12. SSSV Depth MD/TVD:
N/A
20. Thickness of Permafrost MD/TVD:
1795/1725
5. Directional or Inclination Survey: Yes ✓ (attached) No
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
1281776259'
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeler, formation tester, temperature, cement evaluall �ginQcf locator, jeDry, and
perforation record. Acronyms may be used. Attach a separate page if necessary fOi E�/.-� E VE
GR/Res OCT 2 0 2017
23. CASING, LINER AND CEMENTING RECORD
CASING
WT. PER
FT GRADE
SETTING DEPTH MD SETTING DEPTH TVD
HOLE SIZE CEMENTING RECORD
AMOUNT
PULLED
TOP
BOTTOM TOP BOTTOM
16"
62.58 H40
Surf
121' Surf 121'
24" 200 CF
9.625"
40 L-80
Surf
5996' Surf 3465'
1300 sx AS III Lead, 690 sx
12.25" Class G Tail
7"
26 L-80
Surf
13006' Surf 6432'
8.5" 200 sx Class G
2-3/8"
4.7 L-80
12556'
14427' 6094' 6232'
3" Slotted Liner
24. Open to production or injection? Yes ❑✓ No ❑
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size
and Number; Date Perfd):
12556'-14427' MD 16094'-6232' TVD Slotted Liner
/
25. TUBING RECORD
SIZE
DEPTH SET (MD)
PACKER SET (MD/TVD)
3-1/2"
12598'
12498 MD/6052 TVD
12571 MD/6105 TVD
26. ACID, FRACTURE, CEMENT
SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes No -7 -
o ✓Per 20 AAC 25.283 (i)(2) attach electronic and printed information
Per
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
912412017
Method of Operation (Flowing, gas lift, etc.):
GAS LIFT
Date of Test:
10/212017
Hours Tested:
6.8
Production for
Test Period
Oil -Bbl:
1070
Gas -MCF:
594
Water -Bbl:
521
Choke Size:
173
Gas -Oil Ratio:
555
Flow Tubing
Press. 263
Casing Press:
1315
Calculated
24 -Hour Rate --I�
Oil -Bbl:
3778
Gas -MCF:
2098
Water -Bbl:
1838
Oil Gravity - API (torr):
20
Form 10407 Revised 5/2017 V -M /fl/mss/� CONTINUED ON PAGE 2RBS AS OCTi 1� 211�Submit ORIGINAL only
-Pyi 101* � rol,-rj G
28. CORE DATA Conventional Core(s): Yes ❑ No ❑� Sidewall Cores: Yes ❑ No ❑�
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presenceof oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑Z
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1795
1725
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
12817
6259
information, including reports, per 20 AAC 25.071.
Formation @ TPI -Kupark A
TD
14427
6232
(Kuparuk A Sand)
Formation at total depth:
Kuparuk A Sand
31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematics
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070. .11
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: J. Ohlinger Contact Name: Keith Herring
Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herring@cop.com
Authorized Contact Phone: 2634321
Signature: Date: /e 19, /%
INSTRUCTIONS
General: This forth and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
3M-27 Final CTD Schematic
1
6" 62# H40
shoe @ 121' MD
9-518" 36# L-80
shoe @ 5996' MD
C -sand perfs
12,696' -12,708' MD
12,724' -12,744' MD
KOP @ 12,712' MD
A -sand parts
12,764'- 12,784' MD
T' 26# L -8 M0 shoe
@ 13,006' D
3-112" Carrico DS Landing Nipple @ 495' RKB (ID = 2.875")
3-112" 9.3# J-55 EUE 8rd Tubing to surface
3-12" Carrico, MMG gas lift mandrel
@ 3543'.6918!, 9762', 11,666'.12,378- RKB
Baker CMU Sliding Sleeve @ 12,433' RKB
(2.813" ID X -profile)
Baker 80-40 PER @ 12,485' RKB (4.00" ID)
Baker FHL packer @ 12,498' RKB (2.90" ID)
X Nipple @ 12,515' RKB (2.813 ID) (12504' PDC)
Baker Po -Boy Overshot @ 12,533' RKB (12522' PDC)
Camco W Nipple @ 12,550' RKB (2.812" ID) (12539 PDC)
Baker PER @ 12,558' RKB (3.00" ID)
Baker FHL packer @ 12,571' RKB (3.0" ID) (12560' PDC)
3-12" Camco D nipple @ 12,588' RKB (12577' PDC)
(Milled out to 2.80" ID)
3-12" tubing tail @ 12,598' RKB (12587' PDC)
AL3 TD =14427' MD
slatted liner wf deployment sleeve
12556' MD, BOL=14427' MD
=water soluble tracer pups
oil soluble tracer pups
3M-27AU4H TO =15380' MD
2J 8" ebbed liner w/anchored aWminum billet
TOL =1281T MD, BOL= 15380' MD
01 Tmcer at 152W MD (SN: T-740)
Water Tracer et 15273' MO (SN: -5121
3W27A TO=14094' MO
2-38" sbtkd liner w/ qummum beat
TOL= 13232' MD, BOL= 14994' MD
Oil Tracer at 14644' MD (SN:T-16517)
Water Tracer at 14637' MD (SN: T540)
13MT MD, BOL =154W ML
iar at 15208' MD (SN: TAW
Tracer at 1520T MD (SN: T-9
AL2PB1 TD= 14280' MD
red Billet =13416 MD
red Bilet =13480' MD (failed)
>Lt TO= 14882' MD
slotted liner wl aleminum beat
13150' MD, SOL =14882' MD
Operations Summary (with Timelog L)epths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log o
Stan Tme
End Time
Dur (hr)
Phase
Op Code
Activity Code
Tine P -T -X
Operation
Stan Depth
(WS)
End Depth (ftKB)
8/5/2017
8/5/2017
3.00
MIRU
MOVE
MOB
P
Trucks on location, PJSM w/crews,
0.0
0.0
18:00
21:00
follow pre -move check list, pull pit
module away from ddling Sub, pull
drilling Sub off of well, install jeeps,
load shop onto 12' wide trailer.
8/5/2017
8/5/2017
2.25
MIRU
MOVE
MOB
P
Start moving to 3M -pad crossing over
0.0
0.0
21:00
23:15
rig mats
8/5/2017
8/6/2017
0.75
MIRU
MOVE
MOB
P
On 3M -pad, remove jeeps, prep well
0.0
0.0
23:15
00:00
1
for rig.
8/6/2017
8/6/2017
4.00
MIRU
MOVE
MOB
P
Spot modules over well 27, retrieve
0.0
0.0
00:00
04:00
shop and halfway house.
8/6/2017
8/6/2017
2.00
MIRU
WHDBOP
RURD
P
Follow post move check Isit, setting
0.0
0.0
04:00
06:00
stairs, spotting in dumpsters, hooking
up PUTZ
8/6/2017
8/6/2017
2.50
MIRU
WHDBOP
NUND
P
Nipple up BOPE's, fuesable istalled,
0.0
0.0
06:00
08:30
called CPF3 Board, COMMS up after
07:00, prep for BOP test, working on
MP #2 replacing pulsation dampener
8/6/2017
8/6/2017
1.50
MIRU
WHDBOP
NUND
P
PJSM, fluid pack lines, BOP shell test,
0.0
0.0
08:30
10:00
C/O leaking O-ring riser, repeat shell
test to 4200 psi, passed.
•" Rig Accepted 09:00 hour "•
8/6/2017
8/6/2017
9.00
MIRU
WHDBOP
BOPE
P
Begin BOPE test, witness waived by
0.0
0.0
10:00
19:00
Chuck Scheve, lest 10, greased B4 R
8, retested, found bleeder 4leaking
since beginning of test (not part of
WC, will need replaces), greased R3
was faillpass. Test IRV iron, leaking
near pressure bulkhead, LOTO reel to
troubleshoot IR iron
8/6/2017
8/6/2017
1.50
SLOT
WELLPR
MILL
P
PT PDL's and tiger tank line, sim-ops,
0.0
0.0
19:00
20:30
remove bulkhead, repair failed o -ring,
re -install bulkhead.
6/6/2017
8/6/2017
2.00
SLOT
WELLPR
MILL
P
Valve crew on locaiton, load
0.0
0.0
20:30
22:30
equipment, MU extentions, PT
lubricator, pull BPV
8/6/2017
8/6/2017
1.00
SLOT
WELLPR
MILL
P
Retest and chart inner reel iron, good
0.0
0.0
22:30
23:30
test
8/6/2017
8/7/2017
0.50
SLOT
WELLPR
MILL
T
PJSM, PU/MU BHA# 1
0.0
62.4
23:30
00:00
8/7/2017
8/7/2017
0.75
SLOT
WELLPR
MILL
T
Finish MU milling BHA# 1, with turned
62.4
62.4
00:00
00:45
down bi-center bit 2.98", surface test
tools, stab INJH
8/7/2017
8/712017
1.75
SLOT
WELLPR
MILL
T
RIH, taking freeze protect returns out
62.4
9,098.0
00:45
02:30
side to tiget tank.
8/7/2017
8/7/2017
1.00
SLOT
WELLPR
MILL
T
Set down 2k CTSW, PUH circulate
9,098.0
7,940.0
02:30
03:30
milling fluid around, re -boot BHI
computers, PUH for Tie In.
8/7/2017
817/2017
0.55
SLOT
WELLPR
MILL
T
Log formation for tie in/depth control
7,940.0
8,042.0
03:30
04:03
plus 18.0'
8/7/2017
8/7/2017
0.20
SLOT
WELLPR
MILL
T
RIH,
8,042.0
9,030.0
04:03
04:15
8/7/2017
8/7/2017
0.25
SLOT
WELLPR
MILL
T
Log formation correction of plus 2.0'
9,030.0
9,068.0
04:15
04:30
1
- Page 1151 ReportPrinted: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time tog
start Depth
StartTime
End Time
our (hr)
Phase
Op Code
Activity Cade
Time P -T -X
Operation
(W)
End Depth (WS)
8/7/2017
817/2017
3.00
SLOT
WELLPR
MILL
T
Dry Tag TOC @ 9117', PUW 33.5 k.
9,068.0
9,117.0
04:30
07:30
Bring pump up 1.5 bpm at 2315 psi
FS, BHP 2389, WHIP 0, IA 0. OA 338.
Mulitple stalls trying to get a pattern
started. Mixed and pumped 50 bbl pill
w/ 2.5% Safe Lube.
8/7/2017
8/7/2017
1.00
SLOT
WELLPR
MILL
T
Safe lube at bit, 9116.95', 1.8 bpm,
9,117.0
9,117.0
07:30
08:30
2926 psi CP, (2650 psi FS, 300 psi
motor work), First time able to stay on
it w/out stalling, made 1 foot on
Autodriller w/ 0.2K WOB, to 9118',
increased WOB after 1 ft and stalled.
PU 33K
8/7/2017
817/2017
2.80
SLOT
WELLPR
MILL
T
Unable to get mill started. Confer with
9,117.0
9,119.0
08:30
11:18
Town, tried recommended break-in
procedure at low pump rate, 1.2 bpm.
Tried holding in motor stall longer (per
town), Spud in multiple times at 15
FPM, pumps on/off.
8/7/2017
8/712017
3.50
SLOT
WELLPR
MILL
T
Send Pill w/ 0.5 ppb beads, open
9,119.0
9,122.9
11:18
14:48
EDC, circulate down closer to bit,
close EDC. After multiple stalls, able
to stay on it at 1.8 bpm, 2980 CP, 80
to 100 psi motor work, 0.2K WOB,
Fend second 25 bbl bead pill
8/7/2017
8/7/2017
1.70
SLOT
WELLPR
MILL
T
Decision from town to POOH for
9,122.9
62.4
14:48
16:30
different MHA
8/7/2017
8/712017
1.50
SLOT
WELLPR
MILL
T
At surface, OWWFF, hold PJSM, lay
0.0
62.3
16:30
18:00
down HYC 2.98" bi-center bit and
Baker motor, PU HYC 2.73" SD408
Non bi-center PDC bit and new motor
8/7/2017
8/7/2017
1.80
SLOT
WELLPR
MILL
T
RIH
62.3
9,060.0
18:00
19:48
8/7/2017
8/7/2017
0.30
SLOT
WELLPR
MILL
T
Log lie in from 9000' to 9060, continue
9,050.0
9,124.0
19:48
20:06
RIH
8/7/2017
8/7/2017
2.00
SLOT
WELLPR
MILL
T
Dry tag at 9124, PU 33K. Establish
9,124.0
9,141.0
20:06
22:06
FS parameters at 1.2 bpm, 1775 psi
CP, 0 WHIP, 2356 psi BHP, 164 psi
dP. Stall 2X creeping in at 8 FPH.
PU, establish FS parameters at 1.5
bpm, 2306 psi CP, 0 WHP, 2400 psi
BHP, 221 psi dP, able to gel WOB
wlout stall, mill cement
8/7/2017
8/812017
1.90
SLOT
WELLPR
MILL
T
OBM, 1.78 bpm at 2,938 psi FS, BHP
9,141.0
9,168.0
22:06
00:00
1
2,485, WHIP 0, IA 0, OA 502
8/8/2017
8/812017
2.30
SLOT
WELLPR
MILL
T
OBM, 1.79 bpm at 3,025 psi, BHP
9,168.0
9,195.0
00:00
02:18
2,491. WHIP 0, IA 0, OA 508,
CTSW=5.6 k, DHWOB=1.7-2.0 k,
ROP 30 fph
8/6/2017
8/8/2017
0.25
SLOT
WELLPR
MILL
T
Annular and bore pressure increased,
9,195.0
8,700.0
02:18
02:33
PUH 34 k, pulled 50 k at 9,155'.
continued wiper above cement.
8/8/2017
81812017
3.75
SLOT
WELLPR
MILL
T
RBIH, setting down at 9,167',
8,700.0
9,195.0
02:33
06:18
9,162',9,158', 9,144', work back to
bottom (16 stalls since midnight), 1.75
bpm at 2,894 psi FS, BHP 2,572,
WHIP 0, IA 0, OA 527
Page 2151 Report Printed: 9127120171
.F Operations Summary (with Timelog L)epths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start oeptlr
De
Sm Time
End Time
Dur (hr)
Phase
Op code
Activity Code
time P-T-X
operation
(n
End Depth (ttl(a)
8/8/2017
8/8/2017
2.20
SLOT
WELLPR
MILL
T
BOBM, 1.83 bpm at 3,200 psi, BHP
9,195.0
9,212.0
06:18
08:30
2,635, WHIP 0, IA 0, OA 531, CTSW=6
k, DHWOB=1.8 k, ROP 22-30 fph.
Pump 5x5 sweeps, for hole cleaning.
8/8/2017
8/8/2017
1.50
SLOT
WELLPR
MILL
T
PUH, PUW 51 k, DHWOB -12 k, Pull
9,212.0
62.3
08:30
10:00
free, continue PUH, open EDC, POOH
pumping 2.2 bpm at 2,806 psi,
chasing sweep to surface.
8/8/2017
8/8/2017
0.50
SLOT
WELLPR
MILL
T
At surface, check well for flow, PJSM
62.3
62.3
10:00
10:30
8/8/2017
8/8/2017
0.50
SLOT
WELLPR
MILL
T
LD Milling BHA# 2
62.3
0.0
10:30
11:00
8/8/2017
8/8/2017
0.50
SLOT
WELLPR
MILL
T
WO Weatherford tools to arrive
0.0
0.0
11:00
11:30
location.
8/8/2017
8/8/2017
0.50
SLOT
WELLPR
MILL
T
PJSM, PU/MU Reaves Underreamer,
0.0
83.7
11:30
12:00
WFT Motor, Dual Acting Jars, 2.73"
Stabilizer over dead well
8/8/2017
8/8/2017
1.50
SLOT
WELLPR
MILL
T
Tag up, reset counters. RIH, circulate
63.7
9,050.0
12:00
13:30
minimum rate.
8/8/2017
8/8/2017
0.35
SLOT
WELLPR
MILL
T
Log formation correction plus 12.0',
9,050.0
9,091.0
13:30
13:51
PUW 36 k
8/8/2017
8/8/2017
0.40
SLOT
WELLPR
MILL
T
PUH to underream, Gose EDC
9,091.0
8,000.0
13:51
14:15
8/8/2017
8/8/2017
4.00
SLOT
WELLPR
MILL
T
Bring pump up to 1.6 bpm at 3,422
8,000.0
9,141.0
14:15
18:15
psi, BHP 2,225, WHIP 0. IA 0, OA 429,
RIH at 20 fpm, CTSW=11 k,
DHWOB=O
8/6/2017
8/8/2017
0.90
SLOT
WELLPR
MILL
T
Motor work increase, stalled, PUH,
9,141.0
9,075.0
18:15
19:09
difficutly working back down, pump
5x5 sweeps, circulate bottoms up with
cement chunks over the shakers,
caliper indicates tubing collar at 9140'.
8/8/2017
8/8/2017
0.20
SLOT
WELLPR
MILL
T
RBIH to continue under-reaming at
9,075.0
9,141.0
19:09
1921
9141'.
8/8/2017
8/8/2017
2.10
SLOT
WELLPR
MILL
T
Conitinue under-reaming from 9141',
9,141.0
9,212.0
19:21
21:27
stalled at 9149', PUW = 39K, continue
reaming to 9190', PUW = 36K',
increased motor work observed at
9209', stall, PUW = 42K from 9209',
RBIH & again observe increased
motor work at 9209', slow and let mill
off, again let mill off at 9110', ream to
end of pilot-hole at 9212'
8/8/2017
8/8/2017
1.00
SLOT
WELLPR
MILL
T
Continue with under-reamer past end
9,212.01
9,216.0
21:27
22:27
of pilot-hole, pumping 1.8 bpm, CWT =
7K, WOB = .3K, FS = 1285 psi, slow
reaming at -2'-4' fph, confer with town,
decision made to POOH & PU junk
mill.
8/8/2017
8/9/2017
1.55
SLOT
WELLPR
MILL
T
Open EDC, begin POOH to PU 2.80"
9,216.0
2,000.0
22:27
00:00
junk mill, pumping 2.2 bpm
8/9/2017
8/9/2017
0.50
SLOT
WELLPR
MILL
T
Continue POOH, tag up, space out
2,000.0
84.0
00:00
00:30
8/9/2017
8/9/2017
0.90
SLOT
WELLPR
MILL
T
PJSM, flow-check well, LD BHA #3
84.0
0.0
00:30
01:24
over dead well, under-reamer came
out looking good, gauging at 2.90"
Page 3151 ReportPrinted: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Star)Time
End Time
Der (hr)
Phase
Op cafe
Activity Corte
Time P -T -X
Operation
(ftKB)
End Deptit(nKB)
8/9/2017
8/9/2017
0.60
SLOT
WELLPR
MILL
T
PJSM, PU BHA #4 (0° AKO X-Treme
0.0
80.0
01:24
02:00
motor, Baker G -Force up/down jars,
2.80" five -bladed junk -mill), slide in
cart, slab on, check pack -offs, tag up
8/9/2017
8/9/2017
1.70
SLOT
WELLPR
MILL
T
RIH with BHA #4
80.0
9,040.0
02:00
03:42
8/9/2017
8/9/2017
0.10
SLOT
WELLPR
MILL
T
Tie into formation for a +11.5'
9,040.0
9,078.0
0342
03:48
correction, close EDC
8/9/2017
8/9/2017
0.70
SLOT
WELLPR
MILL
T
Continue RIH, set down twice at
9,078.0
9,216.0
03:48
04:30
9144' (min rate & pumps off), PUW =
40K, bring up pumps to 1.8 bpm, FS =
358 psi, stall at 9142', PUW = 40K,
attempt milling at -12 fph and get by,
-
drop rate & continue RIH to 9216',
PUH, bring up rate
8/9/2017
8/9/2017
2.00
SLOT
WELLPR
MILL
T
Milling at 9216, rale in = 1.8 bpm, FS
9,216.0
9,270.0
04:30
06:30
= 345 psi, CWT = 10K, BHP = 2677
psi, WOB = .51K, Stall at 9270'. Pump
5 x 5 sweeps.
8/9/2017
8/9/2017
0.50
SLOT
WELLPR
MILL
T
Wiper up hole to 9155, PUW = 36K,
9,270.0
9,155.0
06:30
07:00
Caught sample.
8/9/2017
819/2017
0.50
SLOT
WELLPR
MILL
T
Wiper back in hole. RIH = 8K
9,155.0
9,270.0
07:00
07:30
8/9/2017
8/9/2017
2.00
SLOT
WELLPR
MILL
T
BOBM, Rate In/Out = 1.8 bpm, FS =
9,270.0
9,336.0
07:30
09:30
355 psi, CWT = 8K, BHP = 2665 psi,
WOB = 0.5-2k, ROP=30-70 fph
8/9/2017
8/9/2017
0.50
SLOT
WELLPR
MILL
T
Wiper up hole, PUW 40 k
9,336.0
9,160.0
09:30
10:00
8/9/2017
8/9/2017
0.50
SLOT
WELLPR
MILL
T
Wiper back in hole, RIW 7 k
9,160.0
9,336.0
10:00
10:30
8/9/2017
8/9/2017
0.50
SLOT
WELLPR
MILL
T
BOBM, 1.82 bpm at 3,600 psi, BHP
9,336.0
9,350.0
10:30
11:00
2,749, WHIP 0, IA 0, OA 577,
8/9/2017
8/9/2017
0.25
SLOT
WELLPR
MILL
T
Wiper up hole PUW 38 k
9,350.0
9,159.0
11:00
11:15
8/9/2017
8/9/2017
0.25
SLOT
WELLPR
MILL
T
Wiper back in hole, RIW 5 k
9,159.0
9,350.0
11:15
11:30
8/9/2017
819/2017
3.25
SLOT
WELLPR
MILL
T
BOBM, 1.79 bpm at 3,830 psi, BHP
9,350.0
9,357.0
11:30
14:45
2,503, WHIP 0, IA 0, OA 595, trouble
keeping steady DHWOB, pump 5x5
sweep
8/9/2017
8/912017
2.25
SLOT
WELLPR
MILL
T
POOH, to check inspect BHA, filling
9,357.0
80.0
14:45
17:00
out trip sheet every 1000'
8/9/2017
8/9/2017
1.40
SLOT
WELLPR
MILL
T
PJSM, flow check, LD BHA #4 over a
0.0
75.0
17:00
18:24
dead well, PU BHA #5 (G -Force
up/down jar, agitator, X-Treme motor,
5 blade junk mill, 2.81"), surface test
agitator, good
8/9/2017
8/9/2017
1.40
SLOT
WELLPR
MILL
T
RIH with BHA#5
75.0
9,040.0
18:24
19:48
8/9/2017
8/9/2017
0.30
SLOT
WELLPR
MILL
T
Log formation for+11' correction
9,040.0
9,080.0
19:48
20:06
8/9/2017
8/9/2017
0.20
SLOT
WELLPR
MILL
T
Continue RIH
9,080.0
9,357.0
20:06
20:18
8/9/2017
8/9/2017
2.10
SLOT
WELLPR
MILL
T
OBM, pumping 1.8 bpm, annular=
9,357.0
9,410.0
20:18
22:24
2770, CWT = 9K, WOB = 1.81K, ,
pump 5x5 sweep, average ROP over
interval = 25 fph
Page 4151 Report Printed: 9 /2 712 01 7
Operations Summary (with Timelog Uepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
am Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(Iara)
End Depth(W)
8/9/2017
8/9/2017
0.40
SLOT
WELLPR
MILL
T
Wiper -trip up to 9102', PUW = 35K,
9,410.0
9,410.0
22:24
22:48
RIW = 7.5K, no issues RIH past 9141'
8/9/2017
8/10/2017
1.20
SLOT
WELLPR
MILL
T
BOBM, pumping 1.8 bpm, CWT =
9,410.0
9,463.0
22:48
00:00
7.75K, WOB= 1.81K, BHP = 2780 psi,
WOB dropped to OK from 9416'-
416'-9419',
9419',encounter green/incompetent
cement beginning at 9434' (continued
to midnight depth of 9463'), no WOB
or motor work observed
8/10/2017
8/10/2017
0.50
SLOT
WELLPR
MILL
T
Continue in green/incompetant
9,463.0
9,600.0
00:00
00:30
cement from 9463'to 9609, observe
significant cement over shakers
8/10/2017
8/10/2017
0.20
SLOT
WELLPR
MILL
T
Wiper up -hole to TOC, PUW = 36K
9,600.0
9,090.0
00:30
00:42
8/10/2017
8/10/2017
0.20
SLOT
WELLPR
MILL
T
Wiper in-hole, RIW = 7K
9,090.0
9,600.0
00:42
00:54
8/10/2017
8/10/2017
1.00
SLOT
WELLPR
MILL
T
Continue in green cement from 9600',
9,600.0
9,814.0
00:54
01:54
continue to observe significant cement
with soft tan material intermixed over
shakers, Sulfuric acid (H2SO4) test on
samples indicates cement, though non
reactive with tan material, performing
short WT's to evaluate hole loading,
PUW= 36K -44K
8/10/2017
8/10/2017
0.60
SLOT
WELLPR
MILL
T
725' wiper trip up to 9090', PUW =
9,814.01
9,814.0
01:54
02:30
37K, RIW = 8.3K, pump 5x5 sweeps
8/10/2017
8/10/2017
1.50
SLOT
WELLPR
MILL
T
BOBM, pumping 1.8 bpm, BHP =
9,814.0
9,866.0
02:30
04:00
2878 psi, FS = 869 psi, stall at 9817',
PUW = 39K, CWT = 10K, WOB =.5K,
encounter competent cement again at
9815', pump 5x5 sweep
8/10/2017
8/10/2017
0.50
SLOT
WELLPR
MILL
T
WT up -hole, PUW =32K
9,866.0
7,836.0
04:00
04:30
8/10/2017
8/10/2017
0.75
SLOT
WELLPR
MILL
T
WT in-hole, tie into formation for = -5'
7,836.0
9,866.0
04:30
05:15
correction, RIW = 8K
8/10/2017
8/10/2017
3.00
SLOT
WELLPR
MILL
T
BOBM, 1.79 bpm at 4,269 psi, BHP
9,866.0
9,950.0
05:15
08:15
2,880, WHIP 0, IA 0, OA 606
8/10/2017
8/10/2017
0.25
SLOT
WELLPR
MILL
T
Wiper up hole, PUW 38 k
9,950.0
9,700.0
08:15
08:30
8/10/2017
8/10/2017
0.25
SLOT
WELLPR
MILL
T
Wiper back in hole, RIW 6.4 k
9,700.0
9,950.0
08:30
08:45
8/10/2017
8/1012017
0.50
SLOT
WELLPR
MILL
T
BOBM, 1.81 bpm at 4,245 psi, BHP
9,950.0
9,971.0
08:45
09:15
1
1
1
2,940, WHIP 0, IA 0, OA 606
8/10/2017
8/10/2017
0.25
SLOT
WELLPR
MILL
T
Stall motor, unable to move pipe, Pull
9,971.0
9,971.0
09:15
09:30
65 k, pipe moving, short wiper up hole
to 9,806'.
8/10/2017
8/10/2017
2.50
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 4,380 psi, BHP
9,971.0
10,015.0
09:30
12:00
3,050, WHIP 0, IA 0, OA 608
8/10/2017
8/10/2017
0.75
SLOT
WELLPR
MILL
T
Stall motor, PUH, PUW 34 k, unable
10,015.0
10,015.0
12:00
12:45
to pump, seems motor is locked up,
open EDC, pump 5x5 sweep,
8/10/2017
8/10/2017
1.50
SLOT
WELLPR
MILL
T
POOH, pump 2.3 bpm w/open EDC
10,015.0
74.8
12:45
14:15
4,230 psi, filling trip sheet every 1000'
8/10/2017
8/10/2017
0.25
SLOT
WELLPR
MILL
T
At surface, check well for flow, PJSM
74.8
74.8
14:15
14:30
Page 51511 Report Printed: 912 712 01 7
Operations Summary (with Timelog Depths)
3M-27
NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
start Time
End Time
Dw (hr)
Phase
Op Code
Activity Code
Time PJA
Operation
(R)(3)
Erb Depth (f KB)
8/10/2017
8/1012017
0.50
SLOT
WELLPR
MILL
T
LD milling BHA# 5, inspect tools.
74.8
0.0
14:30
15:00
found BHI motor to be locked up,
agitator checked out good.
8/10/2017
8/10/2017
0.75
SLOT
WELLPR
MILL
T
PU/MU Milling BHA# 6, w/new X-
0.0
74.6
15:00
15:45
Treme motor
8/10/2017
8/1012017
1.70
SLOT
WELLPR
MILL
T
RIH, pumping 0.30 bpm at 1138 psi,
74.6
9,050.0
15:45
17:27
filling trip sheet every 1000'.
8/10/2017
8/10/2017
0.20
SLOT
WELLPR
MILL
T
Log formation correction of+10
9,050.0
9,082.0
17:27
17:39
8/10/2017
8/10/2017
0.55
SLOT
WELLPR
MILL
T
Continue RIH, RIW = 9K
9,082.0
10,015.0
17:39
18:12
8/1012017
8/10/2017
1.70
SLOT
WELLPR
MILL
T
OBM at 10,015', pumping 1.8 bpm,
10,015.0
10,075.0
18:12
19:54
CWT = 10K, WOB =1.5K, annular =
3004 psi, pumping sweeps to coincide
with WT.
8/10/2017
8/10/2017
0.20
SLOT
WELLPR
MILL
T
Wiper trip (200'), PUW = 35K, RIW =
10,075.0
10,075.0
19:54
20:06
6K
8/10/2017
8/10/2017
1.80
SLOT
WELLPR
MILL
T
OBM at 10,070', pumping 1.8 bpm, FS
10,075.0
10,126.0
20:06
21:54
=948 psi, CWT=4.5K, WOB =1.1 K,
annular = 3078 psi, 5x5 sweeps
coming around.
8/10/2017
8/10/2017
0.60
SLOT
WELLPR
MILL
T
Stall at 10,126', shutdown pumps,.
10,126.0
10,117.0
21:54
22:30
PU, start pulling heavy, RBIH, became
momentarily detained, bring up
pumps, dip jumps up, shut down
pumps, jar down twice, jar up 3 times,
_
no success, attempt to bring up
pumps, dip increased rapidly (stall
condition at 1700 psi diff), shut down
pumps, rate out begins to trickle, bring
pumps back up, rate out returns, BHA
is free, (note: saw DHWOB up to -
15.8K & 70K CWT)
8/10/2017
8/10/2017
1.00
SLOT
WELLPR
MILL
T
WT (up to 9295'), circulate bottoms
10,117.0
10,126.0
22:30
23:30
up, RIW = 6.5K
8/10/2017
8/11/2017
0.50
SLOT
WELLPR
MILL
T
OBM at 10,126', pumping 1.8 bpm, FS
10,126.0
10,138.0
23:30
00:00
= 945 psi, dp = 1042 psi, CWT = 4.6K,
WOB = 1.5K, annular = 3110 psi
8/11/2017
8/11/2017
1.00
SLOT
WELLPR
MILL
T
Continue milling cement at 10,138'
10,138.0
10,165.0
00:00
01:00
pumping 1.8 bpm, CWT = 1.5K, WOB
= 2K, annular = 3160 psi, WHP = 0
psi, FS = 945 psi, dip = 1061 psi, IA =
0 psi, OA = 631 psi, pump sweeps
8/11/2017
8/11/2017
0.40
SLOT
WELLPR
MILL
T
Sweeps come around, WT (500'),
10,165.0
10,165.0
01:00
01:24
PUW = 38K, RIW = 7K
8/11/2017
8/11/2017
1.60
SLOT
WELLPR
MILL
T
OBM at 10,165, pumping 1.8 bpm, FS
10,165.0
10,215.0
01:24
03:00
= 945 ps, CWT = 4.4K, WOB = 1.3K,
annular = 3176 psi, pump sweeps
timed for WT
6/11/2017
8/11/2017
0.30
SLOT
WELLPR
MILL
T
WT (200), PUW = 38K, RIW = 4K
10,215.0
10,215.0
03:00
03:18
8/11/2017
8/11/2017
2.00
SLOT
WELLPR
MILL
T
OBM at 10,215' pumping 1.8 bpm, FS
10,215.0
10,270.0
03:18
05:18
= 940 psi, CWT = 2.5K, WOB = 1.9K,
annular = 3215 psi, pump sweeps
timed for WT
8/11/2017
8/1112017
0.45
SLOT
WELLPR
MILL
T
WT up 200', PUW =40 k,
10,270.0
10,270.0
05:18
05:45
Page 6151 Report Printed: 912712017
Operations Summary (with Timelog Oepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Thine log
Start Depm
Stan Thme
End Time
Dur (hr)
Phase
Op Cotle
Arlivity Cone
Time P -T -x
Operation
(MB)
End DepN(flKa)
8/11/2017
8/11/2017
2.00
SLOT
WELLPR
MILL
T
BOBM, pumping 1.8 bpm FS =4126
10,270.0
10,319.0
05:45
07:45
psi, CTSW=O k, DHWOB=2.2 k, BHP
2,543, WHP 0, IA 0, OA 659
8/11/2017
8/11/2017
0.50
SLOT
WELLPR
MILL
T
Swap milling fluid, wiper up hole,
10,319.0
9,050.0
07:45
08:15
8/11/2017
8/11/2017
0.35
SLOT
WELLPR
MILL
T
Wipertrip back in hole, RIW 11.5 k
9,050.0
10,220.0
08:15
08:36
8/11/2017
8/11/2017
0.25
SLOT
WELLPR
MILL
T
Log formation for depth control
10,220.0
10,259.5
08:36
08:51
correction plus 6.5'
8/11/2017
8/11/2017
0.35
SLOT
WELLPR
MILL
T
Continue IH
10,259.5
10,319.0
08:51
09:12
8/11/2017
8/11/2017
1.95
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 3,535' psi FS, BHP
10,319.0
10,374.0
09:12
11:09
2,7050HP 0, IA 0. OA 644
8/11/2017
8/11/2017
0.50
SLOT
WELLPR
MILL
T
Wiper up hole 500', PUW 36 k
10,374.0
10,374.0
11:09
11:39
8/11/2017
8/11/2017
1.40
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 3,560 psi, BHP.
10,374.0
10,404.0
11:39
13:03
2,795, WHIP 0, IA 0, OA 634
8/11/2017
8/11/2017
0.60
SLOT
WELLPR
MILL
T
Encountered green cement, RIH w/no
10,404.0
10,425.0
13:03
13:39
diff, pumping 1.77 bpm at 3,606 psi,
set down 10,424' stall motor.
8/11/2017
8/11/2017
0.50
SLOT
WELLPR
MILL
T
Wiper up hole, 1000' 9,450',. PUW 38
10,425.0
10,425.0
13:39
14:09
k
8/11/2017
8/11/2017
0.50
SLOT
WELLPR
MILL
T
RIH trying to find bottom, 1.77 bpm at
10,425.0
10,433.0
14:09
14:39
3,581 psi, BHP 2,847, WHP 0, IA 0,
OA 628, stall motor, PUW 43 k. *** 29'
of green cement 8.75 ppg max
8/11/2017
8/11/2017
2.00
SLOT
WELLPR
MILL
T
Bring pump back on line, RBIH, 1.8
10,433.0
10,475.0
14:39
16:39
bpm at 3,747 psi, BHP 2,871, IA 0, OA
623
8/1112017
8/11/2017
0.50
SLOT
WELLPR
MILL
T
Wipertrip up hole 1000'(9,475), PUW
10,475.0
10,475.0
16:39
17:09
42 k
8/11/2017
8/11/2017
2.00
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 10,475', CWT=
10,475.0
10,525.0
17:09
19:09
6K, WOB = 2K, annular = 2965 psi,
stall at 10,523', PUW = 45K, continue
milling ahead to allow sweep to exit
bit.
8/11/2017
8/11/2017
0.85
SLOT
WELLPR
MILL
T
WT (1000'), PUW =40K, RIW = 7K
10,525.0
10,525.0
19:09
20:00
8/11/2017
8/11/2017
2.30
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm, CWT = 7K, WOB =
10,525.0
10,575.0
20:00
22:18
1.7K, annular = 2946 psi, pump
sweeps
8/11/2017
8/11/2017
1.30
SLOT
WELLPR
MILL
T
WT, (1000'), PUW = 43K, tie-in tor-
10,575.0
10,565.0
22:18
23:36
19' correction, RIW = 7K, puts new
corrected depth at 10,555', tag bottom
10' deeper at 10,565', plan to check
counter
8/11/2017
8/12/2017
0.40
SLOT
WELLPR
MILL
T
OBM, CWT =3.7K, WOB =1.9K, FS=
10,565.0
10,572.0
23:36
00:00
814 psi, annular = 3059 psi
8/12/2017
8/12/2017
3.30
SLOT
WELLPR
MILL
T
Continue milling from 10,572',
10,572.0
10,625.0
00:00
03:18
pumping 1.8 bpm, CWT = 4.7K, FS =
814 psi, WOB = 2K, annular = 3044
psi, pump sweeps, stall at 10,585',
PUW = 45K, BHA wiper up to 10,485',
stall at 10,612', PUW = 43K, prepping
to build new milling system on rig,
current system at -70K LSRV
Page 7151 Report Printed: 912712017
Operations Summary (with Timelog L)epths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
StaM1Tme
End Time
Der (hr)
Phase
Op Code
Activity Code
Time P.T-X
Opemtion
(RIB)
End Depth (flKB)
8/12/2017
8/12/2017
1.00
SLOT
WELLPR
MILL
T
WT (1000'), PUW =43K, RIW = 9K
10,625.0
10,625.0
03:18
04:18
Note: Canrig data is faulty/bogus,
troubleshoot issue
8/12/2017
8/12/2017
2.90
SLOT
WELLPR
MILL
T
OBM, annular = 3144, CWT =7K,
10,625.0
10,675.0
04:18
07:12
WOB = 1.91K, stalled at 10,639', PUW
= 60K
8/12/2017
8/12/2017
0.50
SLOT
WELLPR
MILL
T
Wiper up hole, 1000' PUW 42 k, Wiper
10,675.0
10,675.0
07:12
07:42
back in hole, RIW 7 k
8/12/2017
8/1212017
2.60
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 4,700 psi, BHP
10,675.0
10,725.0
07:42
10:18
3,995, WHIP 0, IA 0, OA 629,
8/12/2017
8/12/2017
0.50
SLOT
WELLPR
MILL
T
Wiper up hole, 9,800', PUW 41 It,
10,725.0
10,220.0
10:18
10:48
RBIH, RIW 7 k
8/12/2017
8/12/2017
0.50
SLOT
WELLPR
MILL
T
Log formation correction of minus
10,220.0
10,268.0
10:48
11:18
61.5', inspect and clean counter
8/12/2017
8/12/2017
0.45
SLOT
WELLPR
MILL -
T
Wiper back in hole, RIW 7 k
10,268.0
10,725.0
11:18
11:45
8/12/2017
8/12/2017
2.25
SLOT
WELLPR
MILL
T
BOSM, 1.8 bpm at 3,499 psi, BHP
10,725.0
10,784.0
11:45
14:00
2,772, WHIP 0, IA 0, OA 596,
CTSW=10.2,k, DHWOB=2.2, ROP 21
fph
8/122017
8/12/2017
0.75
SLOT
WELLPR
MILL
T
Wiper up hole to 9,783', 1000' PUW
10,784.0
10,784.0
14:00
14:45
43 k
8/12/2017
8/12/2017
2.00
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 3,500psi, BHP
10,784.0
10,840.0
14:45
16:45
2,921, WHIP 0, IA 0, OA 588, CTSW=7
-1 Ok, DHWOB=2.5k, ROP 30 fph
8/12/2017
8/12/2017
1.20
SLOT
WELLPR
MILL
T
Wiper up hole 1000', PUW = 40K,
10,840.0
10,840.0
16:45
17:57
RIW = 8.51K
8/1212017
8/12/2017
1.90
SLOT
WELLPR
MILL
T
BOBM pumping 1.78 bpm, CWT =
10,840.0
10,890.0
17:57
19:51
3.2K, WOB = 2.4K, annular = 2871
psi, IA = 0 psi, OA = 586 psi, circ
pressure = 3645 psi, stall at 10,858',
PUW = 52K, pump 5x5 sweeps
8/12/2017
8/12/2017
1.00
SLOT
WELLPR
MILL
T
Wiper up -hole 1000%PUW =42.5K,
10,890.0
10,890.0
19:51
20:51
tie-in for -3' correction, RIW = 8K
8/12/2017
8/12/2017
2.30
SLOT
WELLPR
MILL
T
BOBM pumping 1.8 bpm, FS = 800
10,890.0
10,946.0
20:51
23:09
psi, CWT = 6K, WOB = 2K, annular =
2641 psi, circ pressure = 3662 psi
8/12/2017
8/12/2017
0.70
SLOT
WELLPR
MILL
T
WT up -hole 1000', PUW = 42K, RIW =
10,946.0
10,946.0
23:09
23:51
8K
8/12/2017
8/13/2017
0.15
SLOT
WELLPR
MILL
T
BOBM pumping 1.8 bpm, FS = 778
10,946.0
10,949.0
23:51
00:00
psi, CWT = 3.5K, WOB = 2.31K,
annular = 2903 psi
8/13/2017
8/13/2017
1.70
SLOT
WELLPR
MILL
T
Continue milling at 10949', pumping
10,949.0
10,990.0
00:00
01:42
1.8 bpm, CWT = 3K, WOB = 2K,
annular= 2906 psi, pump sweeps
8/13/2017
8/13/2017
0.70
SLOT
WELLPR
MILL
T
Wiper 1 000'up-hole, PUW =43K,
10,990.0
10,990.0
01:42
02:24
RIW =8K
8/13/2017
8/13/2017
2.80
SLOT
WELLPR
MILL
T
BOBM pumping 1.8 bpm, FS = 809
10,990.0
11,040.0
02:24
05:12
psi, CWT = 7K, WOB = 2.4K, annular
= 2880 psi, WHIP = 0 psi, IA = 0 pis,
OA = 595 psi, circ pressure = 3775
psi, MW In = 8.47 ppg, MW Out = 8.47
ppg, LSRV = 19.9K, stalled at 11,013%
pump sweeps, stall at 11,033', PUW =
52K
8/13/2017
8/13/2017
1.00
SLOT
WELLPR
MILL
T
WT up -hole 1000', PUW = 47 k
11,040.0
11,040.0
05:12
06:12
Page 8151 Report Printed: 9127/2017
Operations Summary (with Timelog Depths)
r.
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stert Depth
SteriTime
Ertl Thne
Dur (ho
Phew
op code
A ety Code
Time PJ -X
Operation
(RKe)
End Depth Mot)
8/13/2017
8/13/2017
2.00
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 4,500 psi, BHP
11,040.0
11,090.0
06:12
08:12
2,976, WHP 0, IA 0, OA 611, CTSW=7
it, DHWOB=2.3 k, ROP 28 fph
8113/2017
8/13/2017
0.80
SLOT
WELLPR
MILL
T
Wiper up hole, 1000' PUW 43 k, with
11,090.0
10,090.0
08:12
09:00
5x5 sweep
8/13/2017
8/13/2017
3.00
SLOT
WELLPR
MILL
T
BOBM, 1.8 bpm at 4,759 psi, BHP
11,090.0
11,155.0
09:00
12:00
3,054. WHP 0, IA 0, OA 629, CTSW=6
It, DHWOB=2.6 it, ROP 29 fph
8/13/2017
8/13/2017
2.50
SLOT
WELLPR
MILL
T
Pump 5x5 sweep, POOH, (open EDC
11,155.0
78.8
1200
14:30
Q 9,093')
8/13/2017
8113/2017
0.50
SLOT
WELLPR
MILL
T
At surface, check well for flow, PJSM
78.8
78.8
14:30
15:00
8/13/2017
8/13/2017
0.75
SLOT
WELLPR
MILL
T
LD BHA, remove BHI check valves
78.8
0.0
15:00
15:45
8/13/2017
8/13/2017
2.25
SLOT
WELLPR
MILL
T
PU/MU, noule, stab INJH, jet stack
0.0
0.0
15:45
18:00
and surface lines, grease tree & stack
8/13/2017
8/13/2017
1.00
SLOT
WHDBOP
BOPE
P
Perform BOPE Test (begin test at
0.0
0.0
18:00
19:00
18:00 hm), witness waived by AOGCC
(Brian Bixby), break off n=le, slide
back cart, put on night-cap.
8/13/2017
8/13/2017
1.00
SLOT
WHDBOP
BOPE
P
Test #1, (fail/pass on low), was
0.0
0.0
19:00
20:00
leaking past Bleeder 4
8/13/2017
8/13/2017
1.40
SLOT
WHDBOP
BOPE
P
Continue BOPE test, a bit of difficulty
0.0
0.0
20:00
21:24
getting low on Test #4, pressure up to
1500 psi, bled down, pass
8/13/2017
8/13/2017
0.90
SLOT
WHDBOP
BOPE
T
Test #5, grease Bravo 2, fail/pass
0.0
0.0
21:24
22:18
8/13/2017
8/13/2017
0.70
SLOT
WHOBOP
BOPE
P
Continue BOPE test
0.0
0.0
22:18
23:00
8/13/2017
8/13/2017
0.80
SLOT
WHDBOP
BOPE
T
Test #9, grease & cycle Romeo 3,
0.0
0.0
23:00
23:48
fail/pass
8113/2017
8/14/2017
0.20
SLOT
WHOBOP
BOPE
P
Continue BOPE test
0.0
0.0
23:48
00:00
8/14/2017
8/14/2017
2.00
SLOT
WHDBOP
BOPE
P
Continue BOPE test (8hr test)
0.0
0.0
00:00
02:00
8114/2017
8/14/2017
2.00
SLOT
WELLPR
MILL
T
Replace houred out UQC, replace
0.0
0.0
02:00
04:00
checks, open & clean out MM & choke
lines, transducer lines & TT lines of
potential cement fall out, await BOT
arrival
8/14/2017
8/14/2017
1.50
SLOT
WELLPR
MILL
T
PJSM, PU BHA#7 (2.81"junk mill,
0.0
74.0
04:00
05:30
BOT motor, agitator, up/down jars, 10'
pup), slide in cart, stab on, RIH to 738'
test agitator (good -lest)
8/14/2017
8/14/2017
2.25
SLOT
WELLPR
MILL
T
RIH
74.0
10,305.0
05:30
07:45
8/14/2017
8/14/2017
0.50
SLOT
WELLPR
MILL
T
Log formation, loo deep, PBUH, re-
10,305.0
10,170.0
07:45
08:15
start logging 10,170'
8/1412017
8/14/2017
0.25
SLOT
WELLPR
MILL
T
Log formation correction of plus 36'
10,170.0
10,259.0
08:15
08:30
8/14/2017
8/14/2017
0.50
SLOT
WELLPR
MILL
T
RIH
10,259.0
11,171.0
08:30
09:00
8114/2017
8/14/2017
1.75
SLOT
WELLPR
MILL
T
OBM, 1.7 bpm at 3,400 psi, BHP
11,171.0
11,210.0
09:00
10:45
2,734, WHP 0, IA 0, OA 497
8/14/2017
8/14/2017
0.75
SLOT
WELLPR
MILL
T
Wiper up hole 1000', PUW 43 k,
11,210.0
11,210.0
10:45
11:30 1
1
1
1
1 1
RBIH, RIW 10 k, with 5x5 sweep
Page 9151
Report Printed: 9/2712017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Tiri'ie Log
Start Depth
Start Time
End Time
Our (hr)
Phase
Op code
Activity Cade
T ne P -T -X
Openetian
(Itl(B)
End Depth (WS)
8/1412017
8/14/2017
1.30
SLOT
WELLPR
MILL
T
OBM, 1.7 bpm at 3,180 psi, BHP
11,210.0
11,260.0
11:30
12:48
3,860, WHIP 0, IA 0, OA 494,
CTSW=11 k, DHWOB=2.4 k, ROP=45
fph
8/14/2017
8/14/2017
0.75
SLOT
WELLPR
MILL
T
Wiper up hole 1000', PUW 38 k, wiper
11,260.0
11,260.0
12:48
13:33
back in hole, RIW 9 k with 5x5 sweep
8/14/2017
8/14/2017
1.65
SLOT
WELLPR
MILL
T
OBM, 1.7 bpm at 3,040 psi, BHP
11,260.0
11,314.0
13:33
15:12
2,825. WHP 0, IA 0, OA 510, CTSW=9
k, DHWOB=2.9 k, ROP=37 fph
8/14/2017
8/14/2017
0.70
SLOT
WELLPR
MILL
T
WT up -hole 1000'@ 100 fpm, PUW =
11,314.0
11,314.0
15:12
15:54
41K, RIW=11K
8/14/2017
8/14/2017
1.60
SLOT
WELLPR
MILL
T
OBM, 1.7 bpm, 1.7 bpm, CWT = 7.5K,
11,314.0
11,365.0
15:54
17:30
WOB = 1.7K
8/14/2017
8/14/2017
0.40
SLOT
WELLPR
MILL
T
WT up -hole 1000', PUW =40K, RIW =
11,365.0
11,365.0
17:30
17:54
11K
8/14/2017
8/14/2017
2.70
SLOT
WELLPR
MILL
T
OBM, CWT =9K, WOB =2.7K,
11,365.0
11,415.0
17:54
20:36
annular = 2882 psi, circ pressure =
3181 psi
8/14/2017
8/14/2017
0.40
SLOT
WELLPR
MILL
T
WT up -hole 1000', 100 fpm, PUW =
11,415.0
11,415.0
20:36
21:00
39K, RIW = 10 K
8/14/2017
8/15/2017
3.00
SLOT
WELLPR
MILL
T
OBM, 1.7 bpm, CWT =6KK, WOB =
11,415.0
11,462.0
21:00
00:00
2.5 K, annular = 2919 psi, FS = 854
psi, pump sweeps, slower ROP at. -
17 fph, PUW = 45K from 11,483'
8/1512017
8/15/2017
0.20
SLOT
WELLPR
MILL
T
Continue milling from 11,462'
11,462.0
11,465.0
00:00
00:12
8115/2017
8115/2017
0.50
SLOT
WELLPR
MILL
T
WT up -hole 1000' at 100 fpm, PUW =
11,465.0
11,465.0
00:12
00:42
45K, RIW = 10K, pause at 11,452'to
inspect/troublshoot depth counter
8/15/2017
8/15/2017
3.50
SLOT
WELLPR
MILL
T
OBM, 1.7 bpm, CWT =6K, WOB =
11,465.0
11,516.0
00:42
04:12
1.9K, annular = 2923 psi, circ pressure
= 3335 psi, PU from 11,472 to adjust
depth counter, PUW = 44K, stall at
11,508', PUW = 48K
8115/2017
8/15/2017
0.40
SLOT
WELLPR
MILL
T
WT up -hole 1000', PUW = 44K, RIW =
11,516.0
11,516.0
04:12
04:36
8K
8/15/2017 -
8/15/2017
1.15
SLOT
WELLPR
MILL
T
A couple stalls getting to bottom,
11,516.0
11,530.0
04:36
05:45
OBM, 1.7 bpm, CWT = 4.8K, WOB =
1.6K, annular= 3012 psi
8/15/2017
6/15/2017
0.75
SLOT
WELLPR
MILL
T
Stall motor, PUH, differential 1,000
11,530.0
11,435.0
05:45
06:30
psi, higher then free spin. adjust pump
rate, looks like we have chucked
motor or have a failed agitator, inspect
pipe gouge, take pictures, file down
gouge, inspect counter heads CTES
and INJH.
8/15/2017
8/15/2017
2.00
SLOT
WELLPR
MILL
T
POOH, to inspect BHA
11,435.0
74.2
06:30
08:30
8/15/2017
8/15/2017
0.50
SLOT
WELLPR
MILL
T
At surface, check well for flow, PJSM
74.2
0.0
08:30
09:00
8/15/2017
8115/2017
1.50
SLOT
WELLPR
MILL
T
LD BHA #7. PU BHA #8, (2.81"junk
74.2
580.0
09:00
10:30
mill, BOT motor, agitator, up/down
jars, 10' pup) slide in cart, stab on,
RIH to 567' test agitator (good -test)
8/15/2017
8/15/2017
1.80
SLOT
WELLPR
MILL
T
RIH
580.0
10,210.0
10:30
12:18
8/15/2017
8/15/2017
0.20
SLOT
WELLPR
MILL
T
Tie-In,+14'Correction
10,210.0
10,275.0
12:18
12:30
Page 10151 Report Printed: 9127/2017
. Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Our(hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
MKII)
End Depth(ftKB)
8/15/2017
8/15/2017
0.50
SLOT
WELLPR
MILL
T
RIH
10,275.0
11,542.0
12:30
13:00
8/15/2017
8/15/2017
2.00
SLOT
WELLPR
MILL
T
Tag TD. BOBM, 1.7 bpm, CWT= 8K,
11,542.0
11,590.0
13:00
15:00
WOB = 2.5K, annular= 3112 psi, circ
pressure = 4178 psi, Pump 1 %
DrillZone pill at 11,555': No Benefit,
Mud -swap, New mud at bit: 11585'
8/15/2017
8/15/2017
0.50
SLOT
WELLPR
MILL
T
WT up hole 1000', PUW = 45k, RIW =
11,590.0
11,490.0
15:00
15:30
10k
8/15/2017
8/15/2017
0.50
SLOT
WELLPR
MILL
T
BOBM, 1.7 bpm, CWT =12k, WOB =
11,590.0
11,599.0
15:30
16:00
2.6k, annualar = 2880 psi, circ
pressure = 3464 psi
8/15/2017
8/15/2017
3.00
SLOT
WELLPR
MILL
T
Mechanical coupling on injector drive
11,599.0
11,599.0
16:00
19:00
chain separated. Wait on parts and
repair. Circulate botttoms up. Shut
down pumps. Open EDC. Circulate
2nd bottoms up. NAD NPT 3 Hours
8/15/2017
8/15/2017
0.10
SLOT
WELLPR
MILL
T
Injector motor coupler replaced, Close
11,599.0
11,599.0
19:00
19:06
EDC. estgabish circulation at .3 BPM
up to 1 BPM, PUH, PUW=45K
8/15/2017
8/15/2017
3.40
SLOT
WELLPR
MILL
T
PUH clean to 11,480, RBIH to mill
11,599.0
11,650.0
19:06
22:30
cement, 1.7 BPM Q 3285 PSI FS,
BHP=2928
8/15/2017
8/15/2017
0.40
SLOT
WELLPR
MILL
T
11650, Wiper up to window with tie in
11,650.0
10,210.0
22:30
22:54
before entering GLM @ 11,666
8/1512017
8/15/2017
0.20
SLOT
WELLPR
MILL
T
Log GR for+2.5' correction
10,210.0
10,259.0
22:54
23:06
8/15/2017
8/15/2017
0.30
SLOT
WELLPR
MILL
T
Continue back to bottom to mill
10,259.0
11,651.0
23:06
23:24
8/15/2017
8/16/2017
0.60
SLOT
WELLPR
MILL
T
11651', Mill, 1.7 BPM @ 3331 PSI FS
11,651.0
11,659.0
23:24
00:00
8/16/2017
8/16/2017
2.40
SLOT
WELLPR
MILL
T
Continue milling cement, 1.7 BPM Q
11,659.0
11,700.0
00:00
02:24
3331 PSI FS,
8/16/2017
8/16/2017
0.50
SLOT
WELLPR
MILL
T
Pull 1000'wiper trip, PUW=48K
11,700.0
11,700.0
02:24
02:54
8/16/2017
8/16/2017
2.60
SLOT
WELLPR
MILL
T
11,700 Mill Cement, 1.7 BPM @ 3454
11,700.0
11,750.0
02:54
05:30
PSI FS
8/16/2017
8/16/2017
0.40
SLOT
WELLPR
MILL
T
Pull 1000'wipertrip, PUW=45k
11,750.0
11,750.0
05:30
05:54
8/16/2017
8/16/2017
2.20
SLOT
WELLPR
MILL
T
BOBM. 1.7 bpm, CWT= 10K, WOB =
11,750.0
11,800.0
05:54
08:06
2.7K, annular = 3010 psi, circ pressure
= 3650 psi
8/16/2017
8/16/2017
0.50
SLOT
WELLPR
MILL
T
Pump 5 x 5 sweeps. Pull 1 000'wiper
11,800.0
11,800.0
08:06
08:36
trip, PUW=43k
8/16/2017
8/16/2017
2.50
SLOT
WELLPR
MILL
T
BOBM. 1.7 bpm, CWT= 8k, WOB =
11,800.0
11,850.0
08:36
11:06
2.7k, annular= 3115 psi, circ pressure
= 3815 psi, Pump 5 bbl low vis sweep
at 11,825'.
8/16/2017
8/16/2017
0.50
SLOT
WELLPR
MILL
T
Pump 5 x 5 sweeps. Pull 1000' wiper
11,850.0
11,850.0
11:06
11:36
trip, PUW=44k
8/16/2017
8/16/2017
3.00
SLOT
WELLPR
MILL
T
BOBM. Increase rate to 1.8 bpm,
11,850.0
11,904.0
11:36
14:36
CWT = 8k, WOB = 2.8k, annular=
3255 psi, circ pressure = 4820 psi,
Continue pumping low vis sweep
every 25'.
8/16/2017
8/16/2017
0.50
SLOT
WELLPR
MILL
T
Pump 5 x 5 sweeps. Fluid swap to
11,904.0
11,904.0
14:36
15:06
new system. Pull 1000' wiper trip,
PUW = 43k
Page 11/51 Report Printed: 912 712 01 7
Operations Summary (with Timelog Uepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Tiind Log
StaM1 Depth
Start Tim.
End Time
our (hr)
Phase
Op Code
Actively Code
Time P-T-X
Operation
(ftKB)
End Depth ((a(a)
8/16/2017
8/16/2017
2.30
SLOT
WELLPR
MILL
T
BOBM. 1.8 bpm, CWT = 12k, WOB =
11,904.0
11,950.0
15:06
17:24
2.8k, annular = 2975 psi, circ pressure
= 3575 psi
8/16/2017
8/16/2017
0.40
SLOT
WELLPR
MILL
T
Pump 5 x 5 sweeps. Pull 1000' wiper
11,950.0
11,950.0
17:24
17:48
trip, PUW=45K
8/16/2017
8/16/2017
2.30
SLOT
WELLPR
MILL
T
11950 Mill, 1.8 BPM @ 3504 PSI FS
11,950.0
12,000.0
17:48
20:06
8/16/2017
8/16/2017
0.40
SLOT
WELLPR
MILL
T
12000', pump sweeps, pull 1000'
12,000.0
12,000.0
20:06
20:30
1
1
wiper. PUW=45K
8/16/2017
8/16/2017
2.30
SLOT
WELLPR
MILL
T
12,0001, Mill, 1.8 BPM @ 3596 PSI.
12,000.0
12,050.0
2030
22:48
FS, BHP=3081
8/16/2017
8/16/2017
0.50
SLOT
WELLPR
MILL
T
12050', Pump sweeps, pull 1000'
12,050.0
12,050.0
22:48
23:18
wiper, PYW=45K
8/16/2017
8/17/2017
0.70
SLOT
WELLPR
MILL
T
120501, Mill, 1.8 BPM @ 3627 PSI FS,
12,050.0
12,066.0
23:18
00:00
BHP=3081
8/17/2017
8/17/2017
1.50
SLOT
WELLPR
MILL
T
12066', Milling cement, 1.8 BPM @
12,066.0
12,100.0
00:00
01:30
3627 PSI FS, BHP=3100
8117/2017
8/17/2017
0.50
SLOT
WELLPR
MILL
T
12,100', Pump sweeps, pull 1000'
12,100.0
12,100.0
01:30
02:00
1
1
wiper, PUW=48K
8/17/2017
8/17/2017
1.50
SLOT
WELLPR
MILL
T
12105', milling, 5' difference in bottom,
12,100.0
12,134.0
02:00
03:30
1.8 BPM @ 3676 PSI FS, BHP=3112
8/1712017
8/17/2017
2.50
SLOT
WELLPR
MILL
T
Motor stall, Pull off bottom motor
12,134.0
74.2
03:30
06:00
would not relieve pressure, Diff
pressire 170OPSI @ .9 BPM. Can not
get it to clear, Trip out for BHA.
6/17/2017
8/17/2017
1.10
SLOT
WELLPR
MILL
T
Verify well is dead. Unstab injector.
74.2
0.0
06:00
07:06
LD Mill, Motor, and Agitator. Test
motor and agitator at surface with rig
water and rig air. Inconclusive. Make
up Agitator and nozzle.
8/17/2017
8/17/2017
0.50
SLOT
WELLPR
MILL
T
Change out BOP manifold pressure
0.0
0.0
07:06
07:36
regulator.
8/17/2017
8/17/2017
0.50
SLOT
WELLPR
MILL
T
Slab injector. Function test Agitator
0.0
0.0
07:36
08:06
from BHA #8 at surface on coil. 1.5
bpm, 1415 differential pressure. No
agitation felt at surface.
8/17/2017
8/17/2017
0.50
SLOT
WELLPR
MILL
T
Unstab injector. LD Agitator from BHA
0.0
0.0
08:06
08:36
#8. PU Agitator from BHA #7 and
nozzle.
8/17/2017
8/17/2017
0.40
SLOT
WELLPR
MILL
T
Stab injector. Function test Agitator
0.0
0.0
08:36
09:00
from BHA #7 at surface on coil. 1.5
bpm, 667psi. 1.8 bpm 825 psi. No
agitation felt at surface.
8/17/2017
8/17/2017
0.70
SLOT
WELLPR
MILL
T
Unstab injector. LD Agitator from BHA
0.0
73.6
09:00
09:42
#7. PU BHA #9. 0331 Ridge Set,
BOT Motor, new Agitator. Stab
injector. Replace stripper pack-off.
8/17/2017
8/17/2017
0.30
SLOT
WELLPR
MILL
T
RIH to 480' and shallow test Agitator.
73.6
480.0
09:42
10:00
1.8 bpm. Vissible vibration on counter
wheel.
8/17/2017
8/17/2017
2.20
SLOT
WELLPR
MILL
T
RIH. Tie-in+17'conection. RIH to
480.0
12,132.0
10:00
12:12
bottom.
8/17/2017
8/17/2017
1.30
SLOT
WELLPR
MILL
T
BOBM. 1.7 bpm, Free Spin = 870 psi,
12,132.0
12,185.0
12:12
13:30
CWT = 11 K, WOB = 2K, annular =
3190 psi, circ pressure = 4200 psi.
8/17/2017
8/17/2017
0.50
SLOT
WELLPR
MILL
T
Pull 1000'wiper trip, PUW=47k.
12,185.0
12,185.0
13:30
14:00
Page 12151 Report Printed: 9/27/2017
. Operations Summary (with Timelog Oepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
startTime
End Time
our (hr)
Phase
Op Cede
Adiviry Code
Time P -T -X
Operation
Start Depth
(RKB)
End Depth(ftKB)
8/17/2017
8/17/2017
1.00
SLOT
WELLPR
MILL
T
BOBM. 1.7 bpm, CWT=10k,
12,185.0
12,232.0
14:00
15:00
WOB=2.5k, annular -3180 psi,
circ --4200 psi.
8/17/2017
8/17/2017
0.50
SLOT
WELLPR
MILL
T
Pull 1000'wiper trip, PUW=50k.
12,232.0
12,232.0
15:00
1530
8/17/2017
8/17/2017
1.60
SLOT
WELLPR
MILL
T
BOBM. 1.7 bpm, CWT=7k,
12,232.0
12,282.0
15:30
17:06
WOB=2.5k, annular -3300 psi,
circ=4360 psi.
8117/2017
8/17/2017
0.60
SLOT
WELLPR
MILL
T
Pull 1 000'wiper trip. PUW=53k.
12,282.0
12,282.0
17:06
17:42
8/17/2017
8/17/2017
1.40
SLOT
WELLPR
MILL
T
12282', Mill, 1.7 BPM @ 4090 PSI FS,
12,282.0
12,335.0
17:42
19:06
BHP=3320
8/17/2017
8/17/2017
0.30
SLOT
WELLPR
MILL
T
12335, 1000' wiper, PUW=48K
12,335.0
12,335.0
19:06
19:24
8/17/2017
8/17/2017
2.50
SLOT
WELLPR
MILL
T
12335', Mill, 1.7 BPM @ 4090 PSI FS,
12,335.0
12,387.0
19:24
21:54
BHP=3320, New milling fluid around
@ 12362
8/17/2017
8/17/2017
0.40
SLOT
WELLPR
MILL
T
12387, 1000' wiper, PUW=52 K
12,387.0
12,387.0
21:54
22:18
8/17/2017
8/17/2017
1.60
SLOT
WELLPR
MILL
T
12387', Mill, 1.7 BPM @ 3660 PSI FS,
12,387.0
12,435.0
22:18
23:54
BHP=3395 Cement void @ 12410 to
12414 with no WOB of differential
pressure
8/17/2017
8/18/2017
0.10
SLOT
WELLPR
MILL
T
12435, 1000' wiper, PUW=53K
12,435.0
12,040.0
23:54
00:00
8/18/2017
8/18/2017
0.30
SLOT
WELLPR
MILL
T
Continue 1000'wiper from 12434
12,040.0
12,434.0
00:00
00:18
8118/2017
8/18/2017
1.60
SLOT
WELLPR
MILL
T
12434', Milling, 1.7BPM @ 3352 PSI
12,434.0
12,478.0
00:18
01:54
FS, BHP=3248, Couple of stalls in
12472' area. Posible seal locator
8/18/2017
8/18/2017
1.60
SLOT
WELLPR
MILL
T
During walkaroud injector motor
12,478.0
12,464.0
01:54
03:30
coupler coming loose. PUH and
circulate bottoms up. Open EDC and
continue to circulate. Begin NAD NPT
.
Start couple repair, 1.5 Hrs NAD NPT
8/18/2017
8/18/2017
0.60
SLOT
WELLPR
MILL
T
Repairs Complete, shut EDC.
12,464.0
10,200.0
03:30
04:06
Continue wiper trip to tie in
8/18/2017
8/18/2017
0.20
SLOT
WELLPR
MILL
T
Log tie in for +17' Correction
10,200.0
10,242.0
04:06
04:18
8/18/2017
8/18/2017
0.50
SLOT
WELLPR
MILL
T
RBIH to mill cement
10,242.0
12,492.0
04:18
04:48
8/18/2017
8/18/2017
3.00
SLOT
WELLPR
MILL
T
12490', Mill, 1.7 BPM @ 3320 PSI FS,
12,492.0
12,550.0
04:48
07:48
BHP=3267, RIW=9.3K. Multiple stalls
passing through jewelry.
8/18/2017
8/18/2017
0.50
SLOT
WELLPR
MILL
T
Wiper trip up hole 1000'. PUW=52k.
12,550.0
12,550.0
0748
08:18
8/18/2017
8/18/2017
1.00
SLOT
WELLPR
MILL
T
BOBM. 1.7 bpm, CWT= 10k,
12,550.0
12,576.0
08:18
09:18
WOB=1.6k, annular=3315 psi,
circ --3700 psi.
8/18/2017
8/18/2017
1.40
SLOT
WELLPR
MILL
T
Tag D Profile nipple at 12,576' Mill
12,576.0
12,576.0
09:18
10:42
through with 6 stalls.
8/18/2017
8/18/2017
0.80
SLOT
WELLPR
MILL
T
Mill 9' below profile nipple. 1.7 bpm,
12,576.0
12,585.0
10:42
11:30
WOB=1.5k, annular -3340 psi,
circ --3720 psi. Stalls at 12,582.
Pickup through nipple with pumps off.
No over pulls. .
8/18/2017
8/18/2017
0.50
SLOT
WELLPR
MILL
T
Pump 5 x 5 sweeps. Wiper up hole.
12,585.0
10,200.0
11:30
12:00
1
Page 13151 Report Printed: 912712077
. ; Operations Summary (with Timelog Depths)
r -
3M -27
C..•
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
I
Start OapM
De
SW Time
End Time
Our(hr)
Phase
Op Code
ArAWfy Code
Time P -T -X
Openefion
(M
End Depth (IrNa)
8/18/2017
8/18/2017
0.70
SLOT
WELLPR
MILL
T
Tie -In. +6.5' Correction. RIH to
10,200.0
12,300.0
12:00
12:42
logging depth.
8/18/2017
8/18/2017
0.30
SLOT
WELLPR
MILL
T
Log CCL from 12,300'tc 12585'
12,350.0
12,589.0
12:42
13:00
8/182017
8/18/2017
2.50
SLOT
WELLPR
MILL
T
POOH. Open EDC at 8975'. Close
12,589.0
73.6
13:00
15:30
EDC for Agitator test. Test Agitator at
307'. Goosneck vibrating. Re -Open
EDC.
8118/2017
8/18/2017
1.00
SLOT
WELLPR
MILL
T
PJSM. Verify well is static. Un -Stab
73.6
0.0
15:30
16:30
injector. LD BHA#9. Gauge mill 2.76"
No -Go. Discuss next BHA with town.
8/18/2017
8/18/2017
0.60
SLOT
WELLPR
MILL
T
PU BHA #10. Re -Run 2.76" D331
0.0
71.9
16:30
17:06
Ridge Set, Hailey Under Reamer with
2.875" banana blades, BOT motor,
2.73" stabilizer, BOT jars. Replace
stripper packing. Stab injector.
8/18/2017
8/18/2017
2.00
SLOT
WELLPR
MILL
T
RIH with EDC open.
71.9
10,200.0
17:06
19:06
8/18/2017
8/182017
0.20
SLOT
WELLPR
MILL
T
Log tie in point for+16' correction
10,200.0
10,260.0
19:06
19:18
8/18/2017
8/182017
0.50
SLOT
WELLPR
MILL
T
Continue in well
10,260.0
12,569.0
19:18
19:48
8/18/2017
8/18/2017
0.10
SLOT
WELLPR
MILL
T
Tag up @ 12569, Pull up to break .
12,569.0
12,559.0
19:48
19:54
over, PUW=51 K, PIU 10 mpre feel
.8/18/2017
8/19/2017
4.10
SLOT
WELLPR
MILL
T
Close ECD, Pring pumps online @ 1.7
12,559.0
10,397.0
19:54
00:00
BPM @ 4990. High vibration. Reduce
_
rate to 1.5 BPM @ 4400 PSI. Vibration
managable, Ream uphole @ 10 FPM.
See additional motor work @ 12345,
-
12332, 12323, 12279, 12157, and
12140
8/19/2017
8/19/2017
2.30
SLOT
WELLPR
MILL
T
Continue reaming up @ 10 FPM, 1.5
10,397.0
9,100.0
00:00
02:18
BPM @ 4400 PSI FS, Ream up to
orginal TOC, Pump 5 X 5 sweeps,
Open edc
8/19/2017
8/19/2017
1.60
SLOT
WELLPR
MILL
T
Trip out of well, EDC open
9,100.0
101.0
02:18
03:54
8/19/2017
8/19/2017
1.00
SLOT
WELLPR
MILL
T
At surface, Flow check well, PJSM lay
101.0
0.0
03:54
04:54
down BHA on dead well, U/reamer
arms at 2.75" lower and 2.78" upper
8/19/2017
8/19/2017
1.00
SLOT
WELLPR
MILL
T
M/U BHA #11 with 2.79 NoGo D331
0.0
74.6
04:54
05:54
mwith ridge cutters on straight BOT
motor
8/192017
8/19/2017
2.70
SLOT
WELLPR
MILL
T
RIH. Shallow test Agitator at 328'. Tie
74.6
12,579.0
05:54
08:36
-In +21' correction. Tag D -Nipple at
12,579'
8/192017
8/1912017
1.20
SLOT
WELLPR
MILL
T
Dress up D -Nipple. 1.7 bpm. Free
12,576.0
12,587.0
08:36
09:48
Spin: 840 psi. High vibration. 1 Stall.
Tag TD. Drift back through minimum
rate. Make 7 down reaming passes.
8/19/2017
8/19/2017
2.20
SLOT
WELLPR
MILL
T
POOH. Shallow test agitator.
12,587.0
102.0
09:48
12:00
8/19/2017
8/19/2017
1.00
SLOT
WELLPR
MILL
T
Verify well is static. PJSM. Un -Stab
102.0
0.0
12:00
13:00
Injector. LD BHA #11. Gauge mill
2.75" No Go.
8/19/2017
8/19/2017
1.50
SLOT
WELLPR
MILL
T
Discuss next BHA with town. PU BHA
0.0
74.7
13:00
14:30
#12, 2.80" slick D331. Check packing
in stripper. Slab Injector.
Page 14151 ReportPrinted: 9/272017
Operations Summary (with Timelog Depths)
3M-27
0
1
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
TOW6 Log
Slap Tine
End rme
Dor(hrt
Phase
Op Code
Aclivly Code
Tnne P -T -X
Operation
Start Depth
(n eB))
End Depth (WS)
8/19/2017
8/19/2017
2.10
SLOT
WELLPR
MILL
T
RIH. Shallow test Agitator at 380'. Tie
74.7
12,587.0
14:30
16:36
-In +20' correction. pass through D -
Nipple at 12577, Tag bottom @
12,587
8/19/2017
8/19/2017
1.80
SLOT
WELLPR
MILL
T
Make multiple passes through nipple
12,587.0
12,580.0
16:36
18:24
area, 5. Dry drift nipple area - good
8/19/2017
8/19/2017
2.10
SLOT
WELLPR
MILL
T
POOH, stop and open EDC @ 12556
12,580.0
95.0
1824
20:30
8/19/2017
8/19/2017
0.50
SLOT
WELLPR
MILL
T
At surface, Flow check well, Lay down
95.0
0.0
20:30
21:00
BHA #12, Mill out @ 2.79 NoGo
8/19/2017
8/19/2017
1.30
PROD?
RPEQPT
PULD
P
Make up BHA # 13 with new D-331
0.0
68.5
21:00
22:18
slick gauge mill, .9° AKO motor and
agitator, M/U to coil and surface test,
Inspect packoffs
8/19/2017
8/20/2017
1.70
PROD1
RPEQPT
TRIP
P
Trip in hole, BHA #13 pilot hole
68.5
8,660.0
22:18
00:00
milling, 700' shallow test agitator -
good. Continue in
8/20/2017
8/20/2017
0.30
PRODi
RPEQPT
TRIP
P
Continue tripping in well
6,660.0
10,200.0
00:00
00:18
8/20/2017
8/20/2017
0.20
PROD1
RPEQPT
DLOG
P
Log Gamma tie in for+15.5',
10,200.0
10,249.1
00:18
00:30
8/20/2017
8/20/2017
0.70
PROD1
RPEQPT
TRIP
P
Continue trip in, Bring pump online @
10,249.1
12,588.0
00:30
01:12
12544. Clean pass through milled D
nipple area
8/20/2017
8/20/2017
6.50
PROD1
RPEQPT
MILL
P
Tag up @ 12588 and mill ahead, 1.7
12,588.0
12,716.0
01:12
07:42
BPM @ 3588 PSI FS. Stall and hard
going @ 12598. Call 7" contact. Had
to roll TF to 200° to get milling. 12599'
roll TF back to 20R, ROP 20-25 FPH
with - 2K DHWOB. Stalls at 12,703'
and 12,705'. Orienler loosing high
side at 12708' Suspect magnetic
interference. Lock orienter 20R.
8/20/2017
8/20/2017
0.40
PROD1
RPEQPT
MILL
T
Injector coupling separating again.
12,716.0
12,589.0
07:42
08:06
Pickup into tubing tail to repair,
8/20/2017
8/20/2017
0.10
PROD1
RPEQPT
MILL
T
RIH back to bottom.
12,589.0
- 12,716.0
08:06
08:12
8/20/2017
8/20/2017
3.60
PROD1
RPEQPT
MILL
P
BOBM. 1.7 bpm, WOB=2k,
12,716.0
12,755.0
08:12
11:48
Annular -3510 psi, Pump=4090 psi.
Orienler locked based on internal
highside toolface. 3 stalls at 12,730'.
Pickup and re -verify toolfaoe.
Difficulty working past 12,730' ROP
returned to 20'/hr after passing. TD
pilot hole at 12,755'
8/20/2017
8/20/2017
0.10
PROD1
RPEQPT
TRIP
P
POOH to back ream transition.
12,755.0
12,603.0
11:48
11:54
PUW=48k.
8/20/2017
8/20/2017
0.30
PRODt
RPEQPT
REAM
P
Orient low side. Back ream transition.
12,603.0
12,584.0
11:54
12:12
8/20/2017
8/20/2017
0.20
PROD1
RPEQPT
TRIP
P
TIH. HOT still giving erratic readings
12,584.0
12,755.0
12:12
12:24
at 12,619' and 12,708'. Pump 5 x 5
-
sweep at TD.
8/20/2017
6/20/2017
0.60
PROD1
RPEQPT
CIRC
P
PUH into tubing tail. Wait for sweeps
12,755.0
12,476.0
12:24
13:00
to surface.
8/2012017
8/20/2011
0.40
PROD1
RPEQPT
DLOG
P
Dry drift from tubing tail into pilot hole.
12,476.0
12,755.0
13:00
13:24
Tie -In with K1 marker. Zero
Correction. 1k set downs 12,595' and
12,616. Tag TD.
Page 15151 ReportPrinted: 9127/2017
. Operations Summary (with Timelog Depths)
I�
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
smrma
End rima
Our(hh
Phase
op Code
Activity Code
Time P-T.X
Operation
SW pt h
flK a
EM Depth (flKB)
8/20/2017
8/20/2017
1.50
PRODt
RPEQPT
REAM
P
Back ream from 12,615'to tubing tail.
12,755.0
12,584.0
13:24
14:54
Dry drift second time: I weight at
12,595' and 0.5k at 12,615'. Back
ream from 12,615'to tubing tail. Dry
drift third time. PUH. Ream down at
57min, back ream up. Dry drift fourth
time. Weight bobble less than 0.75k.
8/20/2017
8/2012017
2.00
PROW
RPEQPT
TRIP
P
POOH. Shallow test Agitator at 580'.
12,620.0
109.0
14:54
16:54
1
Good test.
8/20/2017
8/20/2017
1.80
PROD1
RPEQPT
PULD
P
PJSM. Verify well is static. Unstab
109.0
0.0
16:54
18:42
Injector. LD BHA #13. Gauge Mill:
2.80 No Go.
8/20/2017
820/2017
1.00
PROD?
RPEQPT
PULD
P
PJSM, M/U BHA #14 HES caliper;
0.0
24.6
18:42
19:42
M/U to coil and surface test caliper.
8/20/2017
8/20/2017
2.30
PROD?
RPEQPT
TRIP
P
RIH BHA #14 pilot hole caliper run
24.6
12,500.0
19:42
22:00
8/20/2017
8/20/2017
0.20
PROD1
RPEQPT
DLOG
P
Tie into K1 for+19.3
12,500.0
12,658.0
22:00
22:12
8/20/2017
8/20/2017
0.10
PROD1
RPEQPT
TRIP
P
Continue in well
12,658.0
12,744.0
22:12
22:18
8/20/2017
82012017
0.10
PROD1
RPEQPT
DLOG
P
PUH logging pilot hole 1st run,
12,744.0
12,500.0
22:18
22:24
PUW=52K
8/20/2017
8/20/2017
0.10
PROD1
RPEQPT
TRIP
P
Trip back to bottom
12,500.0
12,744.0
22:24
22:30
8/20/2017
8/20/2017
1.30
PROD1
RPEQPT
DLOG
P
PUH logging to 8900, PUW=52K
12,744.0
8,900.0
22:30
23:48
8/20/2017
821/2017
0.20
PROD1
RPEQPT
TRIP
P
End of logging pass, Close caliper
8,900.0
8,503.0
23:48
00:00
1
1
1 fingers, Trip out of well
8/21/2017
821/2017
1.50
PROD1
RPEQPT
TRIP
P
Continue tripping out with HES caliper
8,503.0
67.0
00:00
01:30
8/21/2017
821/2017
0.30
PROD1
RPEQPT
PULD
P
PJSM, Lay down BHA #14 on dead
67.0
0.0
01:30
01:48
well
8/21/2017
8/21/2017
1.20
PROD1
RPEQPT
PULD
P
PJSM, M/U BHA#15, Whipstock with
0.0
74.0
01:48
03:00
OH anchor, M/U to coil and surface
test
8/21/2017
8/21/2017
2.40
PROD1
RPEQPT
TRIP
P
RIHw/Whipstock
74.0
12,600.0
03:00
05:24
8/21/2017
821/2017
0.10
PROD1
RPEQPT
DLOG
P
Log K1 for+15.5
12,600.0
12,625.0
05:24
05:30
821/2017
8/21/2017
0.70
PROD?
RPEQPT
TRIP
P
Continue to setting depth, PUW=49K,
12,625.0
12,722.7
'05:30
06:12
continue up hole to 12695 trying to get
orientation to clear up. PUH to 12635,
RBIH to 12655'. tool seems stable,
RBIH to set depth 12,722.7. Using
internal TF. Close EDC. Pumps on,
See tool shift @ 3700 PSI, DHWOB to
2.02K. Set down 2.5K - Good.
8/21/2017
8/21/2017
2.80
PROD1
RPEQPT
TRIP
P
Open EDC. POOH.
12,722.7
100.0
06:12
09:00
8/212017
8/21/2017
0.20
PROD1
RPEQPT
CTOP
T
Observe CT indention at 79.5' from
100.0
100.0
09:00
09:12
whip end. Photograph damage.
8/21/2017
8/2112017
0.80
PROD1
RPEQPT
PULD
P
PJSM. Verify well is static. Un -Stab
100.0
0.0
09:12
10:00
injector. LD BHA#15.
8/21/2017
821/2017
1.00
PROD1
RPEQPT
CIRC
P
Close master valve. PU nozzle. Re-
0.0
0.0
10:00
11:00
Stab injector. Jet out stack and
surface lines.
Page 16151 Report Printed: 9/27/2017
. - -- Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Alan Dept
Shut Time
EM Time
Our (hr)
Phase
Op Code
A vty Cotle
Time P-T-X
Operation
Me)
End Depth (hKS)
8/21/2017
8/21/2017
1.50
PROD1
RPEQPT
CIRC
P
Un-stab injector. Grease tree valves.
0.0
0.0
11:00
12:30
Install test joint cycle rams and
circulate citric acid through stack. Pull
test joint cycle rams and circulate citric
acid followed by fresh water. Install
BOP test cap.
8/21/2017
8/2112017
0.80
FROM
RPEQPT
BOPE
P
PJSM. Begin SOP test at 12:30
0.0
0.0
12:30
13:18
hours. Witness waived by AOGCC
(Jeff Jones). Tests to 250 psi low,
42000 psi high. Attempt shell test.
Regrease C5. Replace bleeder on
C4.
8/21/2017
8/21/2017
1.60
PROD1
RPEQPT
BOPE
P
Test #1(Upper Swab): Pass
0.0
67-0-
13:18
14:54
Test #2 (Obsolete)
Test #3 (Lower Blind/Shear, TV2):
Pass
Test #4 (V1): Pass
Test#5 (Upper Blind/Shear, Bt, B5,
C4, C5, C8, C12, R1, BLt): Pass
Test #6 (C3, C6, C7, C11, B2, B6,
T2): Fail
8/21/2017
8/21/2017
0.60
FROM
RPEQPT
BOPE
T
Re-Grease C7 and C11.
0.0
0.0
14:54
15:30
1
1
1 Re-Test #6: Pass
8/21/2017
8/21/2017
2.90
FROM
RPEQPT
BOPE
P
Test #7 (Choke D, Choke C): Pass
0.0
0.0
15:30
18:24
(1500 psi / Function)
Test #8 (C2, C10, TI): Pass
Test#9 (R2, BL2, C1, C9): Pass
Test #10 (B4, B8, R3, BL3): Pass
Test #11(133, B7): Pass
Remove tree cap. Install test joint and
fill.
Test gas alarms: Pass
Test #12 (Annular): Pass (2500 psi)
Test #13 (Upper 2-3/8, Upper TIW):
Pass
Test #14 (Lower 2-3/8): Pass
Test #15 (Lower Pipe/Slip): Fail
8/21/2017
8/2112017
0.60
FROM
RPEQPT
BOPE
T
Cycle ram.
0.0
0.0
18:24
19:00
Re-Test *15: Pass
8/21/2017
8/2112017
2.10
FROM
RPEQPT
BOPE
P
Test #16 (Upper Pipe/Slip, Lower
0.0
0.0
19:00
21:06
TIW): Pass
Accumulator recharge: Pass
Remove test joint. Re-Stab Injector.
Test inner reel valve and stripper:
Pass
BOP test complete.
Blow down drilling choke.
8/21/2017
8/21/2017
0.90
FROM
RPEQPT
CTOP
T
LD nozzle, blind sub, and UQC. Boot
0.0
0.0
21:06
22:00
wireline. Stab injector. Pump slack
backwards. Un-stab injector.
8/21/2017
8/22/2017
2.00
PROD1
RPEQPT
CTOP
T
PJSM. Cul 193' of coil to remove
0.0
0.0
22:00
00:00
damage. Cut 88' pipe to find wire
8/22/2017
8/22/2017
2.00
PROD1
RPEQPT
CTOP
T
Continue making up coil tubing
0.0
0.0
00:00
02:00
connector, Pull test to 35K- Good.
M/U UQC, Test wire (>550
Mohms /77.4 Ohmes). Fluid pack coil
and pressure test CTC and UQC to
4450 PSI
8/22/2017
0.50
PROD1
RPEQPT
CTOP
T
Skid back injector / Run pipe into pipe
0.0
0.0
02:00
18/22/2017 1
02:30
I I
shed inspecting gripper blocks - .
Chains for damage or foreign objects
Page 17151 Report Printed: 9127/2017
.,. Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Sted Tane
End Tme
Dur (hr)
Phase
Op Code
Adiviy Code
Time P-T-X
Operation
(I")
End Depth(ft(B)
8/22/2017
8/2212017
1.30
PROD1
WHPST
PULD
P
PJSM, M1U P/U BHA # 16 Window
0.0
74.3
02:30
03:48
milling BHA with .6' motor, 2.79 string
reamer, and 2.80 dimond window mill,
Make up to coil and surface test -
good
8/22/2017
8/22/2017
2.30
PROD1
WHPST
TRIP
P
RIH, EDC open, Pumping 1 BPM
74.3
12,583.0
03:48
06:06
8/22/2017
8/22/2017
0.70
PROD1
RIGMNT
TRIP
T
Inspect coupler / Tighten
12,583.0
12,583.0
06:06
06:48
8/22/2017
8/22/2017
0.10
PROD1
WHPST
TRIP
P
Continue in well
12,583.0
12,600.0
06:48
06:54
8/22/2017
8/22/2017
0.10
PRODt
WHPST
DLOG
P
Log K1 for+15.5'
12,600.0
12,628.0
06:54
07:00
8/22/2017
8/22/2017
0.70
PROD1
WHPST
TRIP
P
Continue in well displaceing used
12,628.0
12,713.0
07:00
07:42
8.8ppg PwrPro tripping in, stop
12651 and close EDC, Dry tag
whipstock @ 12713. Having tool face
issues. go to MWD internal toolface
8/22/2017
8/22/2017
4.80
PROD1
WHPST
MILL
P
Milling window, 12713', 1.6BPM @
12,713.0
12,719.0
07:42
12:30
3685 PSI FS, BHP=3753
8/22/2017
8/22/2017
3.40
PROD1
WHPST
MILL
P
Call bottom of window 12719, Milling
12,719.0
12,735.0
12:30
15:54
rathole
8/22/2017
8/22/2017
2.50
PROD1
WHPST
REAM
P
At bottom of rat hole, ream window
12,735.0
74.0
15:54
18:24
per procedure, PUW=40K As drilled,
30° ROHS, 30° LOHS, 180° ROHS
8/22/2017
8/2212017
3.00
PROD1
WHPST
TRIP
P
POOH, Marks and Gouge on coil, take
74.0
74.0
18:24
21:24
pictures, and upload to s:drive.
8/22/2017
8/22/2017
0.70
PROD?
WHPST
OWFF
P
At surface, check well for flow, PJSM
74.0
74.0
21:24
22:06
8/22/2017
8/22/2017
1.60
PROD1
WHPST
PULD
P
PUD & LD Window milling BHA,
74.0
0.0
22:06
23:42
Window Mill 2.78 no-go, string mill
2.79 no-go
8/22/2017
8/23/2017
0.30
PROD1
DRILL
PULD
P
PU/MU Build Section BHA# 17
0.0
0.0
23:42
00:00
8/23/2017
8/23/2017
0.50
PROD1
DRILL
PULD
P
Continue. PU/MU/ PD build section
0.0
0.0
00:00
00:30
BHA# 17
8/23/2017
8/23/2017
1.00
PROD1
DRILL
PULD
T
Scope change, kink in slick line.
0.0
0.0
00:30
01:30
PJSM, swap to ODS PDL.
8/2312017
8/23/2017
1.50
PROD1
DRILL
PULD
P
Continue PD Buld BHA# 17
0.0
72.2
01:30
03:00
8/2312017
8/23/2017
0.20
PROD1
DRILL
PULD
P
Surface test BHI tools (good test),
72.2
72.2
03:00
03:12
slab INJH, tag up, reset counters
8/23/2017
8/23/2017
2.30
PRODf
DRILL
TRIP
P
RIH
72.2
12,585.0
03:12
05:30
8/23/2017
8/23/2017
0.20
PROD1
DRILL
DLOG
P
Log K1 for+20.5'
12,585.0
12,633.0
05:30
05:42
8/23/2017
8/23/2017
0.20
PROD1
DRILL
TRIP
P
Continue in well, Close EDC @
12,633.0
12,735.0
05:42
05:54
12677, PUW=44K, Clean pass
through window, Tag up at 12735
8/23/2017
8/23/2017
1.80
PROD1
DRILL
DRLG
P
12735', Drill, 1.8 BPM @ 4375 PSI
12,735.0
12,808.0
05:64
07:42
FS, BHP=3646
8/23/2017
8/23/2017
0.20
PRODt
DRILL
WPRT
P
PUH to tie in and log RA, PUW=42K
12,808.0
12,600.0
07:42
07:54
8/23/2017
8/23/2017
0.10
PROD1
DRILL
DLOG
P
Log K1 for -1' RIH and log RA @
12,600.0
12,730.0
07:54
08:00
12719, TOWS=12712.5
8/23/2017
8/23/2017
0.30
PROD1
DRILL
WPRT
P
RBIH to drill
12,624.0
12,808.0
08:00
08:18
Page 18151 Report Printed: 912712017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
smnoepm
sled Time
End Time
our(hr)
Phase
Op code
AdAy Code
Time P -T -X
Operation
(ftKB)
EM Depth (SMO)
8/23/2017
8/23/2017
2.20
PRODt
DRILL
DRLG
P
12808', Drill ahead, 1.8 BPM @ 4352
12,808.0
12,818.0
08:18
10:30
PSI FS, BHP=3902
8/23/2017
8/23/2017
6.50
PROD1
DRILL
DRLG
P
PUW 40 k, OBD 1.8 bpm at 4318 psi
12,818.0
12,950.0
10:30
17:00
FS, BHP 3,897, IA 0, OA 483
8/23/2017
8/23/2017
2.50
PROD1
DRILL
TRIP
P
PUH slowly until sweep out the bit,
12,950.0
72.2
17:00
19:30
POOH
8/2312017
8123/2017
1.15
PROD1
DRILL
PULD
P
PJSM, PUD & LD build section BHA
72.2
0.0
19:30
20:39
8/23/2017
8123/2017
1.50
PROD1
DRILL
PULD
P
PU/MU/PD lateral section BHA, BHA#
0.0
78.2
20:39
22:09
18, surface test tools (good -test)
8/23/2017
8/24/2017
1.85
PROD1
DRILL
TRIP
P
Tag up, reset counters, RIH
78.2
8,500.0
22:09
00:00
8/24/2017
8/24/2017
0.50
PROD1
DRILL
TRIP
P
Continue RIH
8,500.0
12,595.0
00:00
00:30
8/24/2017
8/24/2017
0.10
PROD1
DRILL
DLOG
P
Log the K1 marker correction of plus
12,595.0
12,615.0
00:30
00:36
22', PUW 41 k, RIW 13 k
8/24/2017
8/24/2017
0.30
PROD1
DRILL
TRIP
P
Continue in well
12,615.0
12,951.0
00:36
00:54
8/24/2017
8/24/2017
3.40
PROD1
DRILL
DRLG
P
OBD 1.8 bpm at 4,896 psi FS, BHP
12,951.0
13,360.0
00:54
04:18
3970, WHIP 106, IA 0, OA 373,
CTSW=12 k, DHWOB=2.0 k,
R0P=100 fph
8/24/2017
8/2412017
0.40
PROD1
DRILL
WPRT
P
Wiper to 12980', PUW=41K
13,360.0
13,360.0
04:18
04:42
8/24/2017
8/24/2017
9.00
PROD1
DRILL
DRLG
P
13360', Drill, 1.76 BPM @ 4785 PSI
13,360.0
13,760.0
04:42
13:42
FS, BHP=3843, RIW=10.8K,
Encountered more Ankorite
8/24/2017
8/242017
0.75
PROD1
DRILL
WPRT
P
13760', Wiper to 12975', PUW=45K
13,760.0
13,760.0
13:42
14:27
8/24/2017
8/242017
6.40
PROD1
DRILL
DRLG
P
13760', Drill, 1.8 BPM @ 5037 PSI
13,760.0
14,160.0
14:27
20:51
FS, BHP=3862 PSI, RIW=10K
8/24/2017
8/24/2017
0.50
PROD1
DRILL
WPRT
P
Wiper up hole to 12,725', PUW 45 k
14,160.0
12,735.0
20:51
21:21
824/2017
8/242017
0.25
PR001
DRILL
DLOG
P
Log the RA correction of plus 2.5'
12,735.0
12,766.0
21:21
21:36
8/242017
8/242017
0.50
PROD1
DRILL
WPRT
P
Wiper back in hole, RIW 13 k
12,766.0
14,160.0
21:36
22:06
8/24/2017
8/252017
1.90
PROD1
DRILL
DRLG
P
BOBD 1.8 bpm at 3,908 psi FS, BHP
14,160.0
14,167.0
22:06
00:00
3,946, WHIP 67, IA 0, OA 560, CTSW
=11.3 k, DHWOB=2.9 k, ROP 2 fph
8/252017
8/25/2017
3.50
PRODt
DRILL
DRLG
P
OBD, 1.8 bpm at 5,153 psi,
14,167.0
14,339.0
00:00
03:30
BHP=3,975, WHP=63, IA=O, OA=546,
CTSW=4.4 k, DHWOB=2.9 k, ROP 60
fph
825/2017
8252017
3.30
PRODt
DRILL
DRLG
P
OBD, 1.8 bpm at 5,395 psi,
14,339.0
14,560.0
03:30
06:48
BHP=3,975, WHP=55, IA=O, OA=569,
CTSW=2.2 k, DHWOB=2.5 k,
ROP=62 fph
8/25/2017
8252017
0.70
PRODt
DRILL
WPRT
P
14560', Wiper to 13560', PUW=45K
14,560.0
14,560.0
06:48
07:30
8/25/2017
8/25/2017
4.40
PRODt
DRILL
DRLG
P
14560', Drill 1.78 BPM @ 5100 PSI
14,560.0
14,875.0
07:30
11:54
FS, BHP=3956, Avg ROP 40-60 FPH,
Encountered signs of ankorite with low
to no ROP. Good weight transfer
8/25/2017
8/252017
0.30
PROD1
DRILL
WPRT
P
Pull Mini wiper, PUW=52K
14,875.0
14,875.0
11:54
12:12
Page 19151 Report Printed: 9127120171
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Our (hr)
Phase
Op code
Ac" Cade
Time P -T -X
Operation
(110)
End Depth (1](S)
8/25/2017
8/25/2017
6.00
PROD1
DRILL
DRLG
P
14875', Drill, 1.75 BPM @ 5100 PSI
14,875.0
14,920.0
12:12
18:12
FS, BHP=4002
8/25/2017
8/25/2017
0.25
PROD1
DRILL
WPRT
P
BHA wiper
14,920.0
14,920.0
18:12
18:27
8/25/2017
8/25/2017
1.50
PROD1
DRILL
DRLG
P
BOBD, 1.8 bpm at 5,493 psi,
14,920.0
14,960.0
18:27
19:57
BHP=3,975, WHP=41, IA=O, OA=600,
CTSW=10 k, DHWOB=2.7 k, ROP=22
fph
8/25/2017
8/25/2017
1.00
PROD1
DRILL
WPRT
P
Wiper up hole to 13,960'(1000), PUW
14,960.0
14,960.0
19:57
20:57
43 k
8/25/2017
3.05
PROD1
DRILL
DRLG
P
BOBO, 1.8 bpm at 3,972 psi FS,
14,960.0
14,994.0
20:57
00:00
BHP=4,024, WHP=O, ]A=O, OA=605,
j8/26/2017
CTSW=11.6 k, DHWOB=2.8 k,
ROP=2 fph, TO lateral
8/26/2017
8/2612017
1.50
PROM
DRILL
WPRT
P
Pump 10x10 sweep, perform swab
14,994.0
12,944.0
00:00
01:30
wiper, PUW 44 k
8/26/2017
8/26/2017
1.15
PROM
DRILL
WPRT
P
Notice increase of 600 psi diff while
12,944.0
12,577.0
01:30
02:39
wiper up hole thru build section, RBIH,
turn TF 180' from drilled TF, diff is
lower, perform 7 clean out passes, no
change, continue wiper up hole thru
window to 12,596',
8/26/2017
8/26/2017
2.00
PROD1
DRILL
WPRT
P
Perform static pressure survey, 11.7
12,577.0
78.2
02:39
04:39
ppg (3,700 psi annular), Open EDC,
POOH pumping max rate, filling trip
sheet
8/2612017
8/26/2017
0.50
PROD1
DRILL
TRIP
P
Tag up at surface, inspect INJH, reset
78.2
78.0
04:39
05:09
counters.
8/26/2017
8/26/2017
2.80
PROD1
DRILL
TRIP
P
Trip in hole, EDC open, Pumping
78.0
12,595.0
05:09
07:57
8/26/2017
8/26/2017
0.10
PROM
DRILL
DLOG
P
Log K1 for+5.5, PUW=44K, Close
12,595.0
12,631.0
07:57
08:03
EDC
8/26/2017
8/26/2017
1.70
FROM
DRILL
TRIP
P
Continue in hole, clean through
12,631.0
14,960.0
08:03
09:45
window, Initial tag up @ 14960.
Worked down to 14992. PUH waiting
on beader liner pill. Hard time getting
back in past 14960'. Call that bottom
8/26/2017
8/26/2017
3.10
PROD1
DRILL
TRIP
P
Trip out pumping 12.OPPG beaded
14,960.0
98.0
09:45
12:51
liner running pill followed with 12 PPG
completion fluid. Paint EOP flags (off
13150 & 10800'
8/26/2017
8/2612017
0.30
PROD!
DRILL
PULD
P
At surface, PJSM lay down BHA on
98.0
98.0
12:51
13:09
dead well, Flow check well - good
8/26/2017
8/26/2017
1.10
PROD1
DRILL
PULD
P
Break off injector ant skid back, Lay
98.0
0.0
13:09
14:15
down BHA#18
8/26/2017
8/26/2017
0.70
COMPZ1
CASING
RURD
P
PJSM, R/U to run liner, service
0.0
0.0
14:15
14:57
elevators and top drive
8/26/2017
8/26/2017
4.25
COMPZ1
CASING
PUTB
P
WU BHA #19 with non ported
0.0
1,763.2
14:57
19:12
bullnose, 3 pup joints, Ms slotted
liner, 2 tracers T-165 & T940, 40 As
slotted liner, Aluminum liner top billet
8/26/2017
8/26/2017
2.50
COMPZ1
CASING
RUNL
P
Test BHI Coiltrak tools (good test), tag
1,763.2
12,607.0
19:12
21:42
up, reset counters, RIH
8/26/2017
8/26/2017
0.15
COMPZ1
CASING
RUNL
P
EDP flag, no correction, PUW 42 k
12,607.0
12,607.0
21:42
21:51
826/2017
8/26/2017
0.50
COMPZ1
CASING
RUNL
T
Tighten Coupler on INJH
12,607.0
12,607.0
21:51
22:21
8/26/2017
8/26/2017
1.00
COMPZI
CASING
RUNL
P
Continue IH, RIHCTSW=12 k,
12,607.0
14,994.0
22:21
23:21
RIHDHWOB=O k
Page 20151 Report Printed: 912 712 01 7
. Operations Summary (with Timelog uepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
sten Depth
slan Tim
End Time
Dur(hr)
Phase
op co
AdAy Cotle
Time P-T-X
operetion
(R<13)
End Oeptlt(Po(B)
8/26/2017
8/26/2017
0.15
COMPZ1
CASING
RUNL
P
Tag bottom at 14,996', PUW 51 k,
14,994.0
13,230.4
23:21
23:30
CTSW=51 k, DHWOB=minus 5.6 k,
set back down, bring pump up to 1.7
bpm, 0.80 bpm rertums, PUH,
CTSW=38 k, DHWOB= 0 k, release
liner on bottom.
8/26/2017
8/27/2017
0.50
COMPZI
CASING
TRIP
P
Remove liner length from BHA, POOH
13,230.4
9,945.0
23:30
00:00
'
8/27/2017
8/27/2017
1.25
COMPZ1
CASING
TRIP
P
Continue POOH wtih liner setting
9,941.0
44.2
00:00
01:15
tools, pumping 1.0 bpm at 2,288 psi
8/27/2017
8/27/2017
0.50
COMPZ1
CASING
OWFF
P
At surface, check well for flow ( no-
44.2
44.2
01:15
01:45
flow), PJSM
8/2712017
8/27/2017
0.50
COMPZI
CASING
PULD
P
LD liner setting tools BHA# 19
44.2
0.0
01:45
02:15
8/27/2017
8/27/2017
0.50
PROD2
STK
PULD
P
PU/MU kickoff/drilling BHA# 20
0.0
78.3
02:15
02:45
w/Hycalog C1 bi-center bit and
agitator, surface test BHI Coiltrak tools
(go test)
8/27/2017
8/27/2017
1.50
PROD2
STK
TRIP
P
Tag up, reset counters, RIH, pumping
78.3
6,480.0
02:45
04:15
min rate
8/27/2017
827/2017
0.50
PROD2
STK
CTOP
T
Tighten INJH coupler
6,480.0
6,480.0
04:15
04:45
8/27/2017
8/27/2017
0.90
PROD2
STK
TRIP
P
Continue RIH
6,480.0
12,595.0
04:45
05:39
8/27/2017
8/27/2017
0.20
PROD2
STK
DLOG
P
Log K1 correction of+5.5
12,595.0
12,620.0
05:39
05:51
8/27/2017
827/2017
0.10
PRO02
STK
TRIP
P
Continue in well
12,620.0
12,700.0
05:51
05:57
8/27/2017
8/27/2017
1.70
PROD2
STK
CIRC
P
Displace well back to 8.8 PPG
12,700.0
12,700.0
05:57
07:39
PwrPro, close EDC, PUW=46K
8/27/2017
827/2017
0.50
PROD2
STK
TRIP
P
Continue in well, Clean pass through
12,700.0
13,232.0
07:39
08:09
window, Dry tag liner top billet @
13232
8/27/2017
827/2017
0.70
PROD2
STK
MILL
P
PUH, Bring on pumps @ 1.76 BPM@_
13,232.0
13,233.0
08:09
08:51
5350 PSI FS, BHP=3940. See motor
work and DHWOB @ 13232, Mill @
1 FPH
8/27/2017
8/27/2017
0.60
PROD2
STK
MILL
P
Go to 2 FPH time milling
13,233.0
13,234.0
08:51
09:27
8/27/2017
8/27/2017
0.40
PROD2
STK
MILL
P.
Go to 3 FPH time milling
13,234.0
13,235.0
09:27
09:51
8/27/2017
8/27/2017
0.80
PROD2
DRILL
DRLG
P
12235', Start drilling ahead, Had one
13,235.0
13,270.0
09:51
10:39
stall, reset and drill, 1.75 BPM @ 5350
PSI FS, BHP=3873
8/27/2017
8/27/2017
0.20
PROD2
DRILL
WPRT
P
PUH to dry drift billet area, Set down
13,270.0
13,270.0
10:39
10:51
@ 13237, PUH then run through clean
8/27/2017
8/27/2017
3.40
PROD2
DRILL
DRLG
P
13270', Drill, 1.73 BPM @ 5400 PSI
13,270.0
13,660.0
10:51
14:15
FS, BHP=3927
8/27/2017
8/27/2017
0.40
PROD2
DRILL
WPRT
P
13660, Wiper to 13250, PUW=44K
13,660.0
13,660.0
14:15
14:39
8/27/2017
8/2712017
1.00
PROD2
DRILL
DRLG
P
13660', Drill, 1.73 BPM @ 5680 PSI
13,660.0
13,722.0
14:39
15:39
FS, BHP=4022
8/27/2017
8/27/2017
0.15
PROD2
DRILL
WPRT
P
PUW 45 k, BHA wiper
13,722.0
13,722.0
15:39
15:48
827/2017
8/27/2017
5.00
PROD2
DRILL
DRLG
P
BOBD, 1.74 bpm at 5,681 psi FS,
13,722.0
14,064.0
15:48
20:48
BHP=5,562, WHP=9, IA=O, OA=528,
CTSW=4.5 k, DHWOB=2.2 k,
ROP=42 fph
Page 21151 Report Printed: 912712017
Operations Summary (with Timelog Depths)
-i=
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Stan Tme
End Tune
Our (hr)
Phase
Op Code
Activity Code
Time P-YX
Operation
(fiKB)
End Depth (eKB)
8/27/2017
8/27/2017
0.75
PROD2
DRILL
WPRT
P
Wiper up hole to 13,300', PUW 44 it,
14,064.0
14,064.0
20:48
21:33
wiper back in hole, RIW=6 k
8/27/2017
8/28/2017
2.45
PROD2
DRILL
DRLG
P
BOBD, 1.79 bpm at 6,045 psi FS,
14,064.0
14,212.0
21:33
00:00
BHP 4,074, WHP 8, IA=O, OA=528,
CTSW=minus 1 k, DHWOB=1.5 it,
ROP=90 fph
- 14,187', DHWOB=3.5 k,
CTSW=2.5 k, ROP=O, PUW 50 k,
stack back down minus 15 k, PUW 72
k, pipe free, pull 200' wiper
8/2812017
8/28/2017
1.75
PROD2
DRILL
DRLG
P
OBD, 1.73 bpm at 6,430 psi, BHP
14,212.0
14,318.3
00:00
01:45
4074, WHIP 0, IA 0, OA 532, CTSW=
minus 1.7 k, DHWOB=2.2 k, ROP=55
k
8/28/2017
8/28/2017
0.25
PROD2
DRILL
WPRT
P
Short Wiper up hole to 14,159', PUW
14,318.3
14,318.0
01:45
02:00
42 k, HOT was against the stops,
rotate TF
8/28/2017
8/28/2017
1.50
PROD2
DRILL
DRLG
P
BOBD, 1.74 bpm at 5,319 psi, BHP
14,318.0
14,460.0
02:00
03:30
4,178, WHP 0, IA 0, OA 539, CTSW=6
k, DHWOB=1.3 k, ROP=110 fph
`*` New Mud at the bit
14,3331 ................
Old Mud Stats: 1,931' DF, 0.9% DS
8128/2017
8/28/2017
0.75
PROD2
DRILL
WPRT
P
Wiper up hole for tie in, PUW 44 it
14,460.0
12,735.0
03:30
04:15
8/28/2017
8/2812017
0.15
PROD2
DRILL
DLOG
P
Log the RA correction of plus 5.5'
12,735.0
12,753.0
04:15
04:24
8/28/2017
8/28/2017
0.70
PROD2
DRILL
WPRT
P
RIH, RIW 11 k
12,753.0
14,460.0
04:24
05:06
8/28/2017
8/28/2017
3.80
PROD2
DRILL
DRLG
P
BOBO, 1.75 bpm at 5595 PSI FS,
14,460.0
14,700.0
05:06
08:54
BHP=4039, Pump 10 BBI beaded pill
to evaluate weight transfer @ 14692.
No difference. Surface weight @ -5K
8/28/2017
8/28/2017
3.90
PROD2
DRILL
DRLG
P
14700, Drill ahead1.7 BPM @ 5595
14,700.0
14,860.0
08:54
12:48
PSI FS, BHP=4120
8/28/2017
8/28/2017
0.90
PROD2
DRILL
WPRT
P
14860', 1000'wiper, PUW=45K
14,860.0
14,860.0
12:48
13:42
8/28/2017
8/28/2017
0.60
PROD2
DRILL
DRLG
P
14860', Drill, 1.7 BPM @ 6096 PSI
14,860.0
14,882.0
13:42
14:18
FS, BHP=4099. Pressure is high
across BHA. Circ pressure up 500
PSI. Reduce rate to 1.6 BPM @ 5740
PSI FS
8/28/2017
8/28/2017
2.80
PROD2
DRILL
TRIP
T
14882, Lost differential pressure on
14,882.0
77.0
14:18
17:06
bottom, Trip out
8128/2017
8/28/2017
1.90
PROD2
DRILL
PULD
T
PUD BHA#20, Scope change, Floats
77.0
0.0
17:06
19:00
not holding. Power up coiltrak and
closed EDC. Continue pressure
undeploy
8/2812017
8/28/2017
0.80
PROD2
DRILL
CTOP
T
WU agitator to coil. Stab on well.
0.0
0.0
19:00
19:48
circulate through agitator. .5 BPM @
1605 PSI with .SBPM out. Unstab
injector and lay down agitator
8/28/2017
8/28/2017
0.40
PROD2
DRILL
BOPE
P
Perform Bi -weekly BOPE function test
0.0
0.0
19:48
20:12
-
- Good
8/28/2017
8/28/2017
1.80
PROD2
DRILL
PULD
T
PD pre loaded BHA # 21 with .6`
0.0
62.6
20:12
22:00
motor, Re run bi center. No res tool or
agitator, Surface test tool - Good.
Page 22161 Report Printed: 9/27/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Dep h
Stag Time
Ertl Titre
our (hr)
Wrese
op Cafe
Acti,4 Cada
Time P -T -X
Operation
(ftKB)
EMDepthtflKa)
8128/2017
8/28/2017
1.50
PROD2
DRILL
PULD
T
Identified hydraulic leak on lower
62.6
0.0
22:00
23:30
shear / seal actuator, PJSM, PUD
BHA #21, Nabors Tool Pusher
dispatched mechanic to repair
acctuator.
8/282017
8/29/2017
0.50
PROD2
DRILL
EQRP
T
Prep for hydraulic leak repair, vac out
0.0
0.0
23:30
00:00
fluid in stack, lockout/tagout koomey
unit.
8/29/2017
8129/2017
2.50
PROD2
DRILL
EQRP
T
Continue repairing leak on lower blind
0.0
0.0
00:00
02:30
shear ram actuator
"' Total Nabors NPT 4.5 hrs
8/29/2017
8129/2017
1.15
PROD2
DRILL
PULD
T
PJSM, PD drilling BHA# 21
0.0
62.5
02:30
03:39
8/292017
8/29/2017
2.25
PROD2
DRILL
TRIP
T
RIH, with cleanout/confirm TD BHA#
62.5
12,595.0
03:39
05:54
21 with a 0.6° ako motor and no res
tool.
829/2017
8/29/2017
0.15
PROM
DRILL
DLOG
T
Log K1 marker correction of plus 5.5'
12,595.0
12,621.0
05:54
06:03
8/29/2017
8/29/2017
1.00
PROD2
DRILL
TRIP
T
Continue RIH
12,621.0
14,882.0
06:03
07:03
8/292017
8/292017
0.50
PROD2
DRILL
CIRC
P
Confirm TD, line up and pump liner
-.
14,882.0
14,882.0
07:03
07:33
pill, jogging pipe close to bottom
8/292017
8129/2017
3.00
PROD2
DRILL
TRIP-
P
POOH while laying in 12.0 ppg liner
14,882.0
62.2
07:33
10:33
running pill with alpine beads, PUW 44
k, painting EOP flags
829/2017
8/29/2017
0.50
PROD2
DRILL
OWFF
P
At surface, check well for flow (no-
62.2
62.2
10:33
11:03
1
flow), PJSM
8/29/2017
8/29/2017
0.50
PROD2
DRILL
PULD
P
LD cleanout/confmn TD BHA# 21 on a
62.2
0.6-
11:03
11:33
1
dead well
8292017
8/29/2017
0.25
COMPZ2
CASING
PUTS
P
Prep rig floor for PU liner assembly,
0.0
0.0
11:33
11:48
1 PJSM
8/2912017
8129/2017
3.25
COMPZ2
CASING
PULD
P
MU AL1 Liner assembly, check BHI
0.0
1,710.5
11:48
15:03
check valves and pac-offs
8/29/2017
8/29/2017
0.75
COMPZ2
CASING
PULD
P
PU/MU BHI CoilTrak tools, surface
1,710.5
1,776.3
15:03
15:48
test tools (good test)
8/29/2017
8/29/2017
2.40
COMPZ2
CASING
RUNL
P
RIH, with AL1 liner assmebly BHA# 22
1,776.3
12,573.0
15:48
18:12
8/292017
8292017
0.90
COMPZ2
CASING
RUNL
P
Wt Check 43 k lbs, tie into window flag
12,573.0
14,597.0
18:12
19:06
for 2.42' correction. continue to RIH.
SD @ 14,597', PU 52 k lbs, -10.9 k
-
WOB, continue to RIH.
8/29/2017
8/29/2017
0.10
COMPZ2
CASING
RUNL
P
tie into flag while driving by for no
14,597.0
14,882.0
19:06
19:12
corection. SD @ 14883', stacked -
10k CT wt 2.6 k WOB 2.78k lbs.
stage pump up to 1.5 bpm, CT 4321
psi. PU,Ct wt broke over at 38k lbs,
WOB-3.471k lbs. Released
liner.bottom 14882' TOB 13150.
8/29/2017
829/2017
1.90
COMM
CASING
TRIP.
P
Reset counters, POOH replacing pipe
14,882.0
70.0
19:12
21:06
voydage w KW. Open EDC once in
caseed hole. continue to POOH.
8/29/2017
8/29/2017
0.70
COMPZ2
CASING
PULD
P
PJSM, at surface, flow check - Good,
70.0
0.0
21:06
21:48
unstab injector, Examine pipe, flat
spot -24' back 0.13", @ - 17' back
0.90". Decision made to cut pipe /
rehead. LD BHA # 22 over a dead
well.
Page 23161 Report Printed: 9 /2 712 01 7
Operations Summary (with Timelog L)epths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stad Depth
Start Time
End Time
our (hr)
Phase
Op Code
Ackvity Code
Time P-T-X
Operation
(HKa)
End Depth ME)
8/2912017
8/30/2017
2.20
COMPZ2
CASING
CTOP
P
Cut 30' of pipe and reread, pull test to
0.0
0.0
21:48
00:00
38k lbs - good, install upper Quick, PT
to 4k psi - good.
8/3012017
8/30/2017
1.20
PRODS
STK
PULD
P
PJSM, PU and deploy BHA #23, AL2
0.0
70.0
00:00
01:12
let drilling assembly, over a dead well.
Stab injector, bump up, set counters
8/30/2017
8/30/2017
2.60
PRODS
STK
TRIP
P
RIH, shallow test agitator, came on
70.0
12,595.0
01:12
03:48
above 1 bpm, open EDC, continue to
RIH. Bakerdrillingscreenjumped
from - 7000 feet to 13,000 feet for no
known reason. MWD cycled
equipment and reset depths.
8/30/2017
8/30/2017
0.20
PRODS
STK
DLOG
P
Tie into K1 for+4' correction
12,595.0
12,633.0
03:48
04:00
8/30/2017
8/30/2017
1.25
PRODS
STK
DISP
P
Pull above TOC, open EDC, circ out
12,633.0
12,633.0
04:00
05:15
12.0 kill weight fluid.
8/30/2017
8/30/2017
0.25
PRODS
STK
TRIP
P
RIH, drytag TOB at 13,150', PUH,
12,633.0
13;150.0
05:15
05:30
PUW 37 k
8/30/2017
8/3012017
2.50
PRODS
STK
KOST
P
Bring pump on 1.81 bpm at 5,215 psi,
13,150.0
13,157.0
05:30
08:00
BHP 3,966, WHP 8, IA 0, OA 334,
CTSW=12 k, DHWOB=0.4 k, kickoff
billet as per RP, Dry drift billet area
.
clean
8/30/2017
8130/2017
4.50
PRODS
DRILL
DRLG
P
Drilling ahead, 1.8 bpm at 5,565 psi,
13,157.0
13,484.0
08:00
12:30
BHP 3,988, WHP 0, IA 0, OA 417,
CTSW=7 k, DHWOB=2.6 k, ROP=80-
120 fph
8/30/2017
8/30/2017
0.50
PRODS
DRILL
WPRT
P
Wiper up hole to 12,750', PUW 50 k
13,484.0
12,750.0
12:30
13:00
8/30/2017
8/30/2017
0.50
PRODS
DRILL
WPRT
P
Wiper back in hole, RIW 7 k
12,750.0
13,484.0
13:00
13:30
8/30/2017
8/30/2017
3.00
PRODS
DRILL
DRLG
P
BOBD 1.8 bpm at 5,235 psi FS, BHP
13,484.0
13,700.0
13:30
16:30
3,959. WHP 0, IA 0, OA 454,
CTSW=3.6 k, DHWOB=2.6 k,
ROP=40 fph
8/30/2017
8/30/2017
1.50
PRODS
DRILL
DRLG
P
OBD 1.8 bpm at 5,377 psi, BPH
13,700.0
13,795.0
16:30
18:00
4,043, WHP 0, IA 0, OA 485, CTSW=7
k, DHWOB=1.9 k, ROP=33 fpr
8/3012017
8/30/2017
2.20
PRODS
DRILL
DRLG
P
OBD stall, PU Wt 52 k ran kon
13,795.0
13,875.0
18:00
20:12
something hard, ROP down to - 3
ft/hr, low diff, WOB - 3 k lbs, @
1381 1'started to drill off, getting diff
presure back. ROP increased after
13,814', caught bottoms up sample,
lots of siderite
8/30/2017
8/3012017
0.30
PRODS
DRILL
WPRT
P
PU Wt 43 k lbs, Geo wiper, believe we
13,875.0
13,660.0
20:12
20:30
crossed fault,
8/30/2017
8/3012017
0.30
PRODS
DRILL
WPRT
P
RBIH, SID 13,810', short PU clean,
13,660.0
13,875.0
20:30
20:48
rolled toolface to as drilled- 310
ROHS, SO again 13,816', 3 k lbs,
short Pu clean, RBIH still 330'ROHS,
reduced rale to 0.3 BPM, slid right
through.
Page 24151 Report Printed: 9127/2017
Operations Summary (with Timelog uepths)
-: , --=- )
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stall Depth
Star) rima
End Time
our (hr)
Phase
Dip Code
Activity Code
Time P -T -X
Operation
(MB)
End Depth (WB)
8/30/2017
8/30/2017
3.00
PRODS
DRILL
DRLG
P
1.79 bpm in, 1.70 bpm out, Ct 5350
13,876.0
13,971.0
20:48
23:48
psi, free spin diff 1000 psi, CT RIH wt
9k.
OBD, WOB 1.5 k lbs, CT wt 6.5 k lbs,
ROP 30 ft/hr. Pumped 5 x 5 sweep
pre wiper tirp
CT wt -2.9 k lbs, 1 k lbs WOB, ROP
45 ft/hr
8/30/2017
8/31/2017
0.20
PRODS
DRILL
WPRT
P
PU Wt 43 k lbs, Wiper #2-770'
13,971.0
13,512.0
23:48
00:00
chasing sweeps uphole.
8/31/2017
8/31/2017
0.10
PRODS
DRILL
WPRT
P
PU Wt 43 k lbs, Wiper #2-770'
13,512.0
13,200.0
00:00
00:06
chasing sweeps uphole.
8/31/2017
813112017
0.30
PRODS
DRILL
WPRT
P
RBIH, RIH Wt 7 k Its, RIH Wt 8 k
13,200.0
13,971.0
00:06
00:24
8/31/2017
8/31/2017
3.80
PRODS
DRILL
DRLG
P
1.81 bpm in, 1.72 bpm out, Et 5480
13,971.0
14,078.0
00:24
04:12
psi, free spin diff 1010 psi -.
OBD, CT wt 4 k lbs, WOB 2 k lbs.
ROP 58 Mr. Excess surface weight
short lived. CT weight fell to -3 k lbs w
2 k WOB in 20 min, ROP 30-15 it/ hr
8/31/2017
8/31/2017
0.20
PRODS
DRILL
WPRT
P
PU Wt 42 k lbs, Wipe 100'
14,078.0
14,078.0
04:12
04:24
8/31/2017
8/31/2017
2.00
PRODS
DRILL
DRLG
P
1.82 bpm in, 1.78 bpm out, CT wt 6 k
14,078.0
14,111.0
04:24
06:24
lbs, WOB 1.8 k lbs. CT weight fell
quicly to -4 klbs. ROP —16 ft/hr
8/31/2017
8/31/2017
0.15
PRODS
DRILL
WPRT
P
BHA wiper PUW 47k
14,111.0
14,111.0
06:24
06:33
8/31/2017
8/31/2017
4.25
PRODS
DRILL
DRLG
P
BOBD, 1.8 bpm at 4,886 psi, BHP
14,111.0
14,189.0
06:33
10:48
4,093, WHP 0, IA 0, OA 567, CTSW=
minus 5 it. DHWOB=1.8 k, ROP 15
fph, start new mud down coil
8/31/2017
8/31/2017
4.25
PRODS
DRILL
DRLG
P
OBD, 1.78 bpm at 4,950 psi, BHP
14,189.0
14,280.0
10:48
15:03
3,965, WHP 0, IA 0, OA 568, CTSW=
minus 5.9 k, DHWOB=1.3 k, ROP 15-
28 fph
"O" New mud at the bit 14,189'
8/31/2017
8/3112017
0.75
PRODS
DRILL
WPRT
P
Wiper up hole for tie in. PUW 45 k,
14,280.0
12,595.0
15:03
15:48
14,100' pull heavy 73 k
8/31/2017
8/31/2017
0.15
PRODS
DRILL
DLOG
P
Log the K1 correction of plus 7.5', seat
12,595.0
12,626.0
15:48
15:57
pump
8/31/2017
8/31/2017
1.00
PRODS
DRILL
WPRT .
P
RBIH, Work through tight area @
12,626.0
14,270.0
15:57
16:57
14,100
8/31/2017
8/31/2017
0.70
PRODS
DRILL
WPRT
T
PU to clean up tight section. Stuck
14,270.0
12,691.0
16:57
17:39
multiple times 14,100 - 14,000'. Stack
negative down, Pull 75 ft/min, up to
78k surface weight, 44 k was clean
pick up. Able to pull free. Pump
multiple 5x5 sweeps. Weights clenaed
up above the fault @ 13,800.
Page 25/51 Report Printed: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
.o
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
Stad Time
EndrM
Dur(hr)
Phase
Op Code
Aclivdy Cade
Tim P -T -X
Operation
(KKB)
End DOMCKKB)
8/31/2017
8/31/2017
1.00
PROD3
DRILL
CIRC
T
Open EDC, pumping 1.84 bpm, as the
12,691.0
12,670.0
17:39
18:39
bottoms up landed from when we war
stuck large amounts of cuttings
returned to the shaker. No rocks, all
fines. All twenty valleys on the shaker
full to the top. Sweeps landed and
solids returns were greatly deminished
from previous. Pump two more
sweeps timed out for clean out run.
PU Wt 44 k lbs. Close EDC
8/31/2017
8/31/2017
0.40
PRODS
DRILL
WPRT
T
RBIH,
12,670.0
13,807.0
18:39
19:03
8131/2017
8/31/2017
2.50
PRODS
DRILL
WPRT
T
Pu Wt 45k His, Pull out of hole wiping
13,807.0
78.0
19:03
21:33
-
to the window chasing sweeps to
surface. Open EDC. Contiue out of
hole chasing sweeps. Called our
Baker tool hand w billet and open hole
anchors
8/31/2017
8/31/2017
1.50
PRODS
DRILL
PULD
T
Bump up, PUD BHA# 23.
78.0
0.0
21:33
23:03
8/31/2017
9/1/2017
0.95
PRODS
STK
PULD
T
PU & PD BHA #24
0.0
78.0
23:03
00:00
9/1/2017
9/1/2017
1.50
PRODS
STK
PULD
T
Crew Change, PJSM, contiune to PU
0.0
78.0
00:00
01:30
& PD BHA #24
9/1/2017
9/1/2017
2.90
PRODS
STK
TRIP
T
Bump up, set counters, RIH w
78.0
12,610.0
01:30
04:24
anchored billet.
9/1/2017
9/1/2017
0.20
PRODS
STK
DLOG
T
Tie into the K1 for +6' correction
12,607.0
12,633.0
04:24
04:36
9/1/2017
9/1/2017
0.70
PRODS
STK
TRIP
T
Pu Wt 42 k His, SID pumps, close
12,633.0
13,347.0
04:36
05:18
EDC. Continue to RIH, SID multiple
times
13,272', 3k lbs bounced through
13,329', 3k lbs bounced through
13,347', 4.6 k PU Wt 44 k 20-25 fi/min
13,347', 4.8 k PU Wt 48 k
13,347', 4 k PU Wt 50 k
Orient slip to as drilled, 240° ROHS
SID 13,345' 3k PU Wt 48k
9/1/2017
9/1/2017
0.40
PRODS
STK
TRIP
T
PUH,
13,347.0
12,669.0
05:18
05:42
9/1/2017
9/1/2017
0.75
PRODS
STK
WAIT
T
Open EDC, maintain bottom hole
12,669.0
12,562.0
05:42
06:27
pressure. while creeping up hole, waft
on orders for new seltimg depth
9/1/2017
9/1/2017
0.35
PROD3
STK
TRIP
T
Close EDC, RIH notice counters not
12,562.0
12,562.0
06:27
06:48
working, RIH for tie in
9/1/2017
9/1/2017
0.25
PROD3
STK
DLOG
T
Log the Kt correction of plus 36.5'
12,562.0
12,642.0
06:48
07:03
9/1/2017
9/1/2017
0.50
PROD3
STK
WAIT
T
Confer with town team on billet setting
12,642.0
12,642.0
07:03
07:33
depth
9/1/2017
9/1/2017
3.25
PRODS
STK
TRIP
T
POOH, for cleanout run, (a3 500' PJSM
12,642.0
73.3
07:33
10:48
for PUD Billet BHA# 24
9/1/2017
9/1/2017
1.25
PRODS
STK
PULD
T
PUD, Billet BHA# 24
73.3
0.0
10:48
12:03
9/1/2017
9/112017
0.75
PROD3
DRILL
WAIT
T
Wait on Concretion Bit via/KDTH
0.0
0.0
12:03
12:48
9/1/2017
9/1/2017
1.25
PRODS
DRILL
PULD
T
PJSM, PD cleanout/drill BHA# 25
0.0
78.2
12:48
14:03
Page 26151 Report Printed: 912 712 01 7
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Titus Log
De
Start De)
start Time
End Time
Our (hr
Phase
Op Curie
Atliv'M1y Cotle
Time P -T -x
Operation
(n
EW Depth (flKB)
9/1/2017
9/1/2017
2.50
PROD3
DRILL
TRIP
T
RIH, w/cleanout BHA# 24
78.2
12,600.0
14:03
16:33
9/1/2017
9/1/2017
0.20
PROD3
DRILL
DLOG
T
Tie into the K1 for a +5.5' correction
12,600.0
12,630.0
16:33
16:45
9/1/2017
9/1/2017
0.40
PROD3
DRILL
TRIP
T
Wt Ck 40 k lbs, coninue to RIH
12,630.0
13,300.0
16:45
17:09
9/1/2017
9/1/2017
0.70
PROD3
DRILL
REAM
T
1.80 bpm, C14800 psi, free spin diff
13,300.0
13,819.0
17:09
17:51
830 psi. S/D @ 13,819'stack weight
w motor work. PU 43 k lbs, sticky,
started 5x5 sweep. RBIH
9/1/2017
9/1/2017
0.20
PROD3
DRILL
REAM
T
1.80 bpm, CT 4861, psi, free spin 819
13,819.0
13,700.0
17:51
18:03
psi, RIH wt 10 k Ibs
Tag up 13,813', work at 3 fUmin to
13,826' PU 40k lbs, some neg WOB,
motor work
Crew change
9/1/2017
9/1/2017
1.60
PROD3
DRILL
REAM
T
RBIH S/D @ 13,814 drilled off,
13,700.0
13,837.0
18:03
19:39
continue to RIH, pumping 5x5 sweeps
one in as one exits the nozzle.
Drill to 13,830'3+ k WOB, PU 47k
wipe to above the fault, lots of silt at
the shaker
RBIH, S/D at 13,814 work past,
13,834' hard bottom +3 k WOB,
Work slowly to 13,837, +3k WOB, PU
58 k, wipe to above fault, RBIH
Consult w/ town. Scope change to
prep for billetlopen hole side track
9/1/2017
9/1/2017
0.60
PROD3
DRILL
WPRT
T
PU 47k, PUH as 5x5 sweep exiting
13,837.0
12,550.0
19:39
20:15
the nozzle, to above TOC, questions
re. TOC in tubing, under reamed from
12,559' up ( tagged w underreamer @
12,569) and drilled pilot hole from
12,588 down. Open EDC,
9/1/2017
9/1/2017
0.90
PROD3
DRILL
CIRC_
T
Increase rate to 2.22 bpm, watch two
12,550.0
12,606.0
20:15
21:09
sweeps land on the shaker, solids
greatly reduced on the second.
Loaded another 5x5 sweep in the coil
.
and closed EDC
9/1/2017
9/1/2017
0.20
PROD3
DRILL
DLOG
T
Log K1 for +5.5'correction
12,606.0
12,628.0
21:09
21:21
9/1/2017
9/1/2017
0.20
PROD3
DRILL
WPRT
T
RIH pumping sweeps.
12,628.0
13,700.0
21:21
21:33
9/1/2017
9/1/2017
0.80
PROD3
DRILL
WPRT
T
Pu Wt 39 k lbs, PUH slowly timing out
13,700.0
12,550.0
21:33
22:21
sweeps. continue to POOH chasing
sweeps to surface. Saw slight/brief
motor work @ 12,780' just below the
window, RBIH, PUH, clean. Park and
open EDC.
9/1/2017
9/2/2017
1.65
PROD3
DRILL
WPRT
T
Continue to POOH pumping 2.27 bpm
12,550.0
3,400.0
22:21
00:00
9/2/2017
9/2/2017
0.80
PROD3
DRILL
WPRT
T
Continue to POOH pumping 2.27 bpm
3,400.0
83.0
00:00
00:48
9/2/2017
9/2/2017
1.30
PROD3
DRILL
PULD
T
Tag up, space out, PJSM, PUD & LD
83.0
0.0
00:48
02:06
BHA #26.
9/2/2017
9/2/2017
1.30
PROD3
STK
PULD
T
PU & PD BHA # 26, anchored billet,
0.0
83.0
02:06
03:24
check pack offs - replace.
Page 27151 Report Printed: 9127120171
. Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Start Time
End Time
our(hr)
Phase
Op Code
A dy Code
Tim P-T.X
Operation
(ftKB)
End Depth(W(B)
9/2/2017
9/2/2017
2.45
PRODS
STK
TRIP
T
RIH
83.0
12,610.0
03:24
05:51
9/2/2017
912/'2017
0.15
PRODS
STK
DLOG
T
Log the K1 correction plus 9 ft
12,610.0
12,624.0
05:51
06:00
9/2/2017
9/2/2017
0.25
PRODS
STK
TRIP
T
Continue RIH
12,624.0
13,374.0
06:00
06:15
9/2/2017
9/2/2017
0.25
PRODS
STK
TRIP
T
Small bobble @ 13,347', set down 3
13,374.0
13,374.0
06:15
06:30
times, setting down 4 k=DHWOB,
PUW=48 k,
9/2/2017
9/2/2017
0.50
PRODS
STK
WAIT
T
Call Town Engineer, for plan forward.
13,374.0
13,498.0
06:30
07:00
decision was made to attempt to push
past ledge/debris in hole, set down 4.7
k, PUW=52, RBIH @ 40 fpm, popped
thru, continue RIH'
9/2/2017
9/2/2017
1.00
PROD3
STK
TRIP
T
Continue RIH, set down 4.7 it,
13,498.0
13,498.0
07:00
08:00
PUW=52 k, try and work billet down
13 limes, setting down 4-6 k, max
PUW= 60 k (sticky), max set down
weight 6.5 k DHWOB, AP=dropping to
3,342 psi, bring annular pressure back
up to MP 4,058 psi with no success in
getting past 13,498'
9/2/2017
9/2/2017
0.25
PRODS
STK
WPST
T
Call Town Engineer, plan forward set
13,498.0
13,475.0
08:00
08:15
Estimated TOB at 13,475', Anchor set
@ 30 ROHS. Bring pump up to 4,241
psi, tool shifted showing 1.7 k
DHWOB, set down additional 1.5 k,
PUW=47 k
9/2/2017
9/2/2017
2.50
PRODS
STK
WPST
T
POOH, pumping 1.0 bpm at 2773 psi,
13,475.0
73.3
08:15
10:45
filling in trip sheet, PJSM @ 750' from
surface
9/2/2017
9/2/2017
1.15
PRODS
STK
PULD
T
Tag up at surface, space out, PUD &
73.3
0.0
10:45
11:54
LD BOT Setting tools
9/2/2017
9/2/2017
1.25
PRODS
STK
PULD
T
PD kickoff/drilling BHA# 27
0.0
78.3
11:54
13:09
9/2/2017
9/2/2017
0.50
PRODS
STK
SVRG
P
PJSM, w/crew and Hydra -Rig rep,
78.3
78.3
13:09
13:39
measuring goose neck A -
frame..... When stabbed on to stump.
9/2/2017
9/2/2017
2.00
PROD3
STK
TRIP
T
Tag up, zero counters, RIH following
78.3
12,610.0
13:39
15:39
MP schedule, filling trip sheet every
1000% test agitator at 308', (working)
9/2/2017
9/2/2017
0.25
PROD3
STK
DLOG
T
Log the K1 marker correction of plus
12,610.0
12,620.0
15:39
15:54
4.5', PUW=40 it
9/2/2017
9/2/2017
0.35
PROD3
STK
TRIP
T
Continue RIH, RIW=13 k
12,620.0
13,480.0
15:54
16:15
9/2/2017
9/2/2017
2.00
PRODS
STK
KOST
T
Dry tag TOB, bring pump up to 1.8
13,480.0
13,483.0
16:15
18:15
bpm at 5,238 psi FS, BHP 3,968,
WHP 0, IA 0, OA 253
9/2/2017
9/2/2017
0.90
PRODS
STK
KOST
T
1.80 bpm, targeting 0.5-1 k WOB,
13,483.0
13,495.0
18:15
19:09
@ 13,483' ROP 3 ft/hr, WOB -.661k
lbs
@ 13,485' increased ROP to 5.5 ft/hr-
WOB 0.8 k lbs
@ 13,486 increased ROP to 12 ft/hr-
WOB 0.3 k lbs
@13,487' chasing it, 15 ft/min, WOB 1
k lbs
Page 28151 Report Printed: 9/2 712 01 7
min Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stmt Depth
Start Time
End Time
Cur hr
( )
Phase
Op Cale
Activity Cotle
Time P -T-%
Operation
(N(8)
Entl Cepih (MKe)
9/2/2017
9/2/2017
0.40
PROD3
STK
TRIP
T
Drilling ahead, 130-30 ff/hr, lost depth
13,495.0
13,508.0
19:09
19:33
tracking.
'" Note WOB started falling off at
19:19 right when the depth counter
apears to have failed.
9/2/2017
9/2/2017
1.10
PROD3
STK
TRIP
T
PU 38k lbs, mechanical @ 13,444',
13,508.0
12,734.0
19:33
20:39
jog slowly in 10 foot interval.
Effect repair and pull slowly up hole,
reduce pump rate "best guess' where
we think TOB is. Bring rate back up
continue up hole logging to RA tag.
See pip tag on the drive by
9/2/2017
9/2/2017
0.20
PROD3
STK
DLOG
T
RBIH log RA tag for +7' correction
12,734.0
12,753.0
20:39
20:51
9/212017
9/2/2017
0.20
PROD3
STK
TRIP
T
RIH,
12,753.0
13,497.0
20:51
21:03
9/2/2017
9/2/2017
0.40
PROD3
STK
DLOG
T
SID @ 13,497, PU, RBIH, bounce
13,497.0
13,598.0
21:03
21:27
through.
Continue to RIH logging from 13,508
down.
Drive past suspect bottom, park at
13,532' survey- suspect in original
hole.
reduce pumps to min rate attempt to
tag bottom.
Survey @ 13,564' same results, in old
hole
Turn around at 13,598' -
9/2/2017
9/2/2017
1.20
PRODS
STK
WPRT
T
Pump 5x5 sweep, PU, POOH toward
13,598.0
12,544.0
21:27
22:39
the window wiping hole. Pump
another 5x5 sweep
Make 2 up down passes, LS on up,
HS on down from 13,430 - 13,300' in
attempt to clean up the previous
trouble spot. Continue to POOH.
9/2/2017
9/3/2017
1.35
PROD3
STK
WPRT
T
Open EDC, POOH pumping 2.2 bpm
12,544.0
4,693.0
22:39
00:00
chasing sweeps.
9/3/2017
9/3/2017
1.30
PROD3
STK
WPRT
T
Continue to POOH. Packed off the
4,693.0
78.0
00:00
01:18
MM while tripping, bypass same and
contiue out of hole. Jog near surface.
9/3/2017
913/2017
1.50
PROD3
STK
PULD
T
Bump up, space out, PUD,
78.0
0.0
01:18
02:48
-Bit had 7 of 10 total side ( reaming )
cutters severely damaged
***Bit graded 1-7
9/3/2017
9/3/2017
1.50
PRODS
STK
PULD
T
PU and PD BHA # 28, Aluminum billet
0.0
73.0
02:48
04:18
w open hole anchors, bump up, set
counters, pumps on at min rate,
9/3/2017 -
913/2017
2.50
PROD3
STK
TRIP
T
RIH, close EDC, contiue to RIH
73.0
12,610.0
04:18
06:48
913/2017
9/3/2017
0.20
PROD3
STK
DLOG
T
Tie into K1 for plus 4.0' Correction,
12,610.0
12,632.0
06:48
07:00
PUW 42 k
9/3/2017
9/3/2017
0.50
PRODS
STK
TRIP
T
Continue IH
12,632.0
13,426.0
07:00
07:30
9/3/2017
9/3/2017
0.25
PROD3
STK
WPST
T
At depth, PUW=43 k, RBIH to
13,426.0
13,415.0
07:30
07:45
13426.8' PUH 39 k, bring pump online
0.45 bpm, tool sheared at 4,800 psi,
9/3/2017
9/3/2017
2.15
PROD3
STK
TRIP
T
POOH, PJSM @ 750' from surface
13,415.0
61.2
07:45
09:54
Page 29151 Report Printed: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
Start TM ane
End Time
Owes)
Phase
Op Code
Activity Code
Time P -T -X
Ope n
(ftKB)
End Dep (WO)
9/3/2017
9/3/2017
0.80
PRODS
STK
PULD
T
PUD BOT setting tools
61.2
0.0
09:54
10:42
9/3/2017
9/3/2017
0.25
PRODS
STK
PULD
T
LD BOT tools
0.0
0.0
10:42
10:57
9/3/2017
9/3/2017
1.00
PRODS
STK
PULD
T
PU/MU AL2 kickoff/drilling BHA,
0.0
78.3
10:57
11:57
surface test tools (good -test)
9/3/2017
9/3/2017
2.00
PRODS
STK
TRIP
T
Tag up, zero counters, RIH w/AL2
78.3
12,610.0
11:57
13:57
kickoff/drilling BHA# 29
913/2017
9/3/2017
0.15
PRODS
STK
DLOG
T
Log K1 marker correction of plus 4.0'
12,610.0
12,716.0
13:57
14:06
9/3/2017
9/3/2017
0.50
PRODS
STK
TRIP
T
Continue IH
12,716.0
13,415.0
14:06
14:36
9/3/2017
9/3/2017
2.00
PRODS
STK
KOST
T
Dry tag TOB, PUW 40 k, bring pump
13,415.0
13,425.0
14:36
16:36
on-line 1.8 bpm at 5,124 psi, BHP
3,934, WHP 0, IA 0, OA 275,
CTSW=11.3 it, DHWOB=0.15 k,
Kickoff Billet as per RP, 20'ROHS
9/3/2017
9/3/2017
2.00
PRODS
DRILL
DRLG
T
Start drilling formation 1.8 bpm at
13,425.0
13,750.0
16:36
18:36
5,719 psi, BHP 3,932, WHIP 0, IA 0,
OA 386, CTSW=8 k, DHWOB=1.6 k,
ROP 67 fph
Stalled, PU and dry drifted billet clean
PU @ 13,537'to get restarted, 43 K
lbs
BOBD 130-155 ft/hr,
Pump 5x5 @ 13,672' drilling @ 150
R/hr, Ct Wt Ok lbs, 1.73 k Ibis
Sweeps start exiting the nozzle @
13,746', staged a 10 bbl Hi vis sweep
in the coil to time out below the
window.
9/3/2017
9/3/2017
1.70
PROD3
DRILL
WPRT
T
Pu, Wt 44 klbs
13,750.0
13,360.0
18:36
20:18
PUH chasing sweeps.
Pull 50 k lbs @ 13,460, tum around,
S/D, PU, pump min rate, RBIH, SID,
PU, RBIH
Bounce through, continue in hole
13,650, PU WL 44 k
PUH @ 30 fttmin pumping 1.8 bpm,
sweeps exit at 13,480'. Small neg
WOB @ 13460'. turn around 13,438'
RBIH @ 1.0 bpm. saw a little WOB
spike at 13,4683, other than that clean
PU 43k,
PUH, saw a little neg WOB again @
13,460'
Pulled past billet, 44 k clean, saw 48 k
CT wt as we drug by with a -1 k WOB
spike.
9/3/2017
9/3/2017
2.50
PRODS
DRILL
TRIP
T
Continue to POOH.
13,360.0
74.0
20:18
22:48
Open EDC above TOC, increase
pump rate from 1.8 to 2.2 bpm
Continue to POOH
9/3/2017
9/4/2017
1.20
PRODS
DRILL
PULD
T
Bump up, space out, PUD BHA #29,
74.0
0.0
22:48
00:00
UDsame
9/4/2017
9/4/2017
0.40
PRODS
DRILL
PULD
T
Continue to lay down BHA #29
0.0
0.0
00:00
00:24
Page 30/51 Report Printed: 912 712 01 7
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
WCode
Activit' Coda
Tine P -T -X
Operation
(ftKB)
End Depth(flKB)
9/4/2017
9/4/2017
3.60
FROM
DRILL
RURD
P
Prep to lest BOPS
0.0
0.0
00:24
04:00
PU nozzle, stab injector, jet stack,
(rolling coil to fresh water while jetting
stack),
Un Stab injector, central shops grease
tree valves, Nabors crew grease
stack. and/choke valves, Test inner
reel iron low/ high good.
install night cap,
9/4/2017
9/4/2017
2.00
FROM
WHDBOP
BOPE
P
PJSM, Flood up BOP stack, Start test
0.0
0.0
04:00
06:00
@ ( 4:00) Witness of test by AOGCC
- Bob Nobel. 250 psi low 14200 psi
High.
test #1 Swab 2, - pass
Test #2 Lower Blind shear, TV2 - pass
Test #3 BOP TVI -
Test #4 Upper blind shear, B1,&5
C4,5,8,&12, R1, bleeder 1
Test#5 C3,6,7,&11,62&6, T2
9/4/2017
9/4/2017
8.00
FROM
WHDBOP
BOPE
P
Crew change, PJSM, conbue BOP
0.0
0.0
06:00
14:00
testing, sim-ops - replace coupler pn
motor #11, right angle drive motors on
INJH,
"" BOP test Complete 14:00 (10 hrs
TT), 2 fail/pass, R3 grease and
function (retest good) and Koomey # 1
accumulator pump failed, changed out
contactor, (retest good)
9/4/2017
9/4/2017
0.65
FROM
DRILL
DISP
P
Stab INJH onto stump, circulate coil to
0.0
0.0
14:00
14:39
drilling Buid.Unstab INJH, move cart
back
9/4/2017
9/4/2017
1.75
FROM
DRILL
PULD
T
PU/PD pre -loaded BHA# 30
0.0
78.3
14:39
16:24
9/4/2017
9/4/2017
0.25
FROM
DRILL
PULD
T
Stab INJH, surface test Coiltrak tools
78.3
78.3
16:24
16:39
(good -test), tag up, zero counters
9/4/2017
9/4/2017
2.00
FROM
DRILL
TRIP
T
RIH, w/ AL2 drilling BHA# 30
78.3
- 12,595.0
16:39
18:39
w/agitator and RR bi-center bit
9/4/2017
9/4/2017
0.15
FROM
DRILL
DLOG
T
Log the K1 marker correction of plus
12,595.0
12,632.0
18:39
18:48
8.5'
9/4/2017
9/4/2017
0.25
FROM
DRILL
TRIP
T
Continue IH
12,632.0
13,750.0
18:48
19:03
914/2017
9/4/2017
1.50
FROM
DRILL
DRLG
T
OBD, 1.8 bpm at 4,875 psi FS, BHP
13,750.0
13,862.0
19:03
20:33
3,996, WHIP 0, IA 0, OA 364, CTSW=9
k, DHWOB=1.7 k, ROP 69 fph
9/4/2017
9/4/2017
0.15
FROM
DRILL
WPRT
T
BHA wiper, PUW 44 k
13,862.0
13,862.0
20:33
20:42
9/4/2017
9/4/2017
2.00
FROM
DRILL
DRLG
T
BOBD, 1.75 bpm at 4,888 psi FS,
13,862.0
13,976.0
20:42
22:42
BHP 9,994, WHIP 0, IA 0, OA 365,
CTSW=1.5 it, DHWOB=1.4 k, ROP 50
-69 fph, pump 5x5 sweep
914/2017
9/4/2017
0.25
PROD3
DRILL
WPRT
T
Sweep at bit, wiper up hole, PUW 44 k
13,976.0
13,750.0
22:42
22:57
9/4/2017
9/4/2017
0.15
PRODS
DRILL
WPRT
T
Wiper back IH, RIW 10 k
13,750.0
. 13,976.0
22:57
23:06
9/4/2017
9/5/2017
0.90
FROM
DRILL
DRLG
T
BOBD, 1.75 bpm at 4,797 psi FS,
13,976.0
14,053.0
23:06
00:00
BHP 3,996, WHIP O, IA O. OA 371,
CTSW=minus 2k, DHWOB=1.7 k,
ROP=50 fph
Page 31151 Report Printed: 9/27/2017
.` Operations Summary (with Timelog Depths)
3M-27
ConocoPhillips
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Tifiie Log
Start Depth
Stan Time
End Time
our (m)
Phase
Op Code
Activity Cotle
Time P -T -X
Operation
(Wlt)
End Depth (MB)
9/5/2017
9/5/2017
1.40
PRODS
DRILL
DRLG
T
OBD 1.75 bpm Ct 5000 psi, BHP
14,053.0
14,150.0
00:00
01:24
3,996, WHP 0, IA 0. OA 402, CT Wt -3
k lbs, WOB 1 k IbsROP 70 ft/hr
BHA wiper at 14,072'- PU 43 K lbs
BHA wiper at 14,091'- PU 45 K lbs -
sent 5x5 low/hi sweep
average ROP over interval drilled 70
ft/hr
9/5/2017
9/5/2017
0.40
PROD3
DRILL
WPRT
T
Wiper#2, 700'after sweeps exit the
14,150.0
13,450.0
01:24
01:48
bit - PU Wt 40k lbs
9/5/2017
9/5/2017
0.40
PRODS
DRILL
WPRT
T
RBIH, Tight spot @ 13,850'
13,450.0
14,150.0
01:48
02:12
Swap from mud pump #2 to #1 to
repair a packing leak
9/5/2017
9/5/2017
1.80
PRODS
DRILL
DRLG
T
1.77 bpm, off bottom CT 4795 psi, diff
14,150.0
14,270.0
02:12.
04:00
944 psi, Ct RIH Wt 10 k IDS
OBD, Ct wt, 8 k lbs, WOB 1.5 k lbs,
ROP 70 it/ hr
Drilled into something hard -14,165'3
K WOB, ROP 30 ft/hr
PU & restart @ 14,165', 42 k lbs
Broke through @ 14,170'- ROP 170
it/ hr WOB 1.5-2 k - short lived, settled
in at 100 fUhr
@ 14,199'diff fell off, PU 46 k lbs-
RBIH, send 5x5
BHA wiper 100'@ 14,249' PU 43 k lbs
BOBD up to 130 ft/hr w neutral coil
weight and 600 lbs WOB
Average ROP 67It hr
Losses crept up to -- 0.1 bpm
9/5/2017
9/5/2017
2.50
PRODS
DRILL
DRLG
P
OBD, Ct wl, 2.5 k lbs, WOB 1 k lbs,
14,270.0
14,432.0
04:00
06:30
ROP 70 f f hr
PU and restart @ 14,333' PU Wt 43k
PU and restart @ 14,35' PU Wt 47k -
pump 5x5
Average ROP 65 ft/hr
9/5/2017
9/5/2017
2.20
PRODS
DRILL
DRLG
P
OBD, Ct wl, -5 k lbs, WOB 1.0 - 0.5 k
14,432.0
14,543.0
06:30
08:42
lbs, ROP 120 - 30 ft/ hr
on something hard, 14,511'
pump 5x5 in anticipation of a wiper trip
Averag ROP 50 ft/hr
9/5/2017
9/5/2017
0.80
PRODS
DRILL
WPRT
P
Wiper #3 after sweeps exit the bit - PU
14,543.0
12,610.0
08:42
09:30
Wt 43k Itis - 1933'
Saw some motor work below the
window @ 12,880'
9/5/2017
9/5/2017
0.10
PRODS
DRILL
DLOG
P
RBIH, tie into K1 for +3.5'correction
12,610.0
12,633.0
09:30
09:36
- -
9/5/2017
9/5/2017
0.80
PRODS
DRILL
WPRT
P
RBIH
12,633.0
14,543.0
09:36
10:24
WOB bobble @ 13,867', SID @
13,914' bounced through
Page 32151 Report Printed: 9/27/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Tme
End Trre
ow (hr)
Phase
Op Code
Activity Cade
Time P-T-X
Operation
(ftKB)
End Deph(ftKB)
9/5/2017
915/2017
4.00
PRODS
DRILL
DRLG -
P
1.83 bpm, Ct 5140 psi, diff 980 psi
14,543.0
14,649.0
10:24
14:24
RIH Wt 4 k lbs
OBD, CtWt 3.5 k lbs, WOB 1.1 k, ROP
55 Whir
PU Wt43 k lbs, Swap from Pump #1
to #2 RBIH
CT Wt -5 k lbs, WOB 1.36 k lbs, ROP
43 ft/hr
PU to get restarted @ 14,649', 45 k
lbs not much change, pump 5x5
PU as sweep exited the nozzle, PU wt
43k,
9/5/2017
9/5/2017
1.80
FROM
DRILL
DRLG
P
1.70 bpm, free spin diff 855 psi
14,649.0
14,722.0
14:24
16:12
OBD, CtWt 4 to -5 k lbs, WOB 1 to 0.5
k, ROP 10 - 30 ft/hr
_
Send sweeps, poor ROP and weight
transfer
PU to restart @ 14,707' , Pu Wt 46k
.
50 fUhr while pill exiling then death
spiral, PU Wt 50 klbs.
9/512017
915/2017
0.20
PRODS
DRILL
WPRT
P
PU Wt, 47 k IDS - 300' short wiper
14,722.0
14,503.6-
16:12
16:24
RBIH
9/512017
9/5/2017
0.60
PRODS
DRILL
WPRT
P
1.70 bpm, Ct 4801 psi, free spin diff
14,503.0
14,722.0
16:24
17:00
860 psi, RIH Wt 3.3k
BOBD, CIWt 5 k lbs, WOB 1 k, ROP
35 f thr, send 10 bbl beaded pill
9/5/2017
9/5/2017
2.50
PROD3
DRILL
DRLG
P
Continue drilling ahead from 14,722',
14,722.0
14,795.0
17:00
19:30
performing BHA wipers as required,
begin climbing to planned 94"
inclination to regain sand at 14745' (as
per geology)
9/5/2017
9/5/2017
3.50
FROM
DRILL
DRLG
P
OBD at 14,795', CWT=-5K-2K,
14,795.0
14,876.0
19:30
23:00
WOB =M.11 bbl/min losses, pumping
beaded pills as required, increase NBI
to 96% multiple BHA wipers to keep
going, PUN from 14,843'= 52K
(averaging — 42K - 44K).
Began sending 5x5 sweeps from
14,862' in prep for WT & mud swap
after exiting lower Al Silt, average
ROP over interval = 23 fph
9/5/2017
9/5/2017
0.50
PRODS
DRILL
WPRT
P
Wiper up-hole, PUW = 45K
14,876.0
13,450.0
23:00
23:30
9/5/2017
9/6/2017
0.50
FROM
DRILL
WPRT
P
Wiper in-hole, clean past
13,450.0
14,200.0
23:30
00:00
13,830' (Fault #1), three 2.51K set
downs at —13,869'& —13,850', PUW =
42K, reduce rate to .2 bpm & get by,
set down at 13,899', again reduce to
min rate & get by, RI W at 14,190'=
9.4K
9/6/2017
9/6/2017
0.20
FROM
DRILL
WPRT
P
Continue WT in-hole
14,200.0
14,876.0
00:00
00:12
1
9/6/2017
9/6/2017
2.80
PRODS
DRILL
DRLG
P
BOBD, FS = 930 psi, CWT = 1 K,
14,876.0
14,933.0
00:12
03:00
WOB = 1 K, arc pressure = 5413 psi,
rate in = 1.7 bpm, began pumping new
mud (System #5), new mud at the bit
at 14,906', PUW = 50K from 14,907',
increase rate to 1.8 bpm, experience
significant vibrations, reduce rate back
down to 1.7 bmp
Page 33151 ReportPrinted: 912712017
Operations Summary (with Timelog L)epths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
or (hr)
Phase
Op Code
Activity Corte
Time P -T -X
Operation
(IIKB)
End Depth (11M)
9/6/2017
9/6/2017
3.00
PRODS
DRILL
DRLG
P
Continue drilling from 14,933', rate in
14,933.0
15,018.0
03:00
06:00
= 1.7 bpm, FS = 950 psi, CWT = 5K,
WOB = 1 K, continue snubbing coil,
PUW = 48K from 14,941', attempt 1.5
bpm, continue to struggle with weight
transfer, bring rate back up to 1.7
bpm, begin to lube up pill pit to 2%
776 (50 bbl).
9/612017
9/6/2017
4.20
PROD3
DRILL
DRLG
P
OBD, pumped 20 bbis 2% lube pill.
15,018.0
15,118.0
06:00
10:12
Pre, coming of a BHA wiper, 1.83
bpm,
CT 5135 psi, diff 990 psi, Ct Wt -2k,
WOB 0.8 k ROP 27 ft/hr
Post, all 20 bbis lube pill out
Ct Wt -6, WOB 0.5 k, had to pick up. -
little effect,
built and pumped a 20 bbl 2% low
torque sweep from active mud.
WOB up to 2.8 k lbs with neg CT wt,
first time we've broke 1 k WOB all
morning. lube up active system to 2%
low torque.
23 N hr average
9/6/2017
9/6/2017
0.50
PROD3
DRILL
DRLG
P
Drilling break, ROB up to 110 R/hr
15,118.0
15,150.0
10:12
10:42
PU's dropped to 43 k lbs, able to
easily tum around
Weight transfer gradually deteriorated
at 140 bbls away of the 20 bbl pill
ROP averaged 64 fUhr
9/612017
9/6/2017
0.40
PROD3
DRILL
WPRT
P
Wiper #2 PU Wt 51 k - 1,450'
15,150.0
13,700.0
10:42
11:06
14,357' to 14,200'a little motor work
13,863' motor work, -1.4 k WOB,
pulled —50 k , 10 k over clean string
weight
9/6/2017
9/6/2017
0.50
PROD3
DRILL
WPRT
P
Wiper RBIH
13,700.0
15,150.0
11:06
11:36
13,860' WOB spike
13,875' S/D 3.3 k, PU, RBIH min rate
slid through
Stack weight 13,906 to 13,968 while
RIH Q min rate
9/6/2017
9/6/2017
5.40
PROD3
DRILL
DRLG
P
BOBD, struggled to get to bottom, had
15,150.0
15,300.0
11:36
17:00
to reduce pumped rate and ramp up to
drilling rate once on bottom.
CT Wt -61k lbs, WOB 0.5 k ROP 20-70
fl/hr
Straggling with weight transfer, build
another 2% low torque pill, pump 20
bbis
No change in weight transfer. Add
beads to pill, pump with little benefit.
Build 2 ppb beaded pills w active mud
and pump as sweeps - 10 bbls each.
little benefit.
9/6/2017
9/6/2017
4.00
PRODS
DRILL
DRLG
P
OBD, trouble fuming around below
15,300.0
15,376.0
17:00
21:00
15,110'
Ct wt 0 to -8 k lbs, WOS, 0.3 to 1 k
lbs, ROP 15 -40 ftJhr.
Pumping 10 bbl beaded pills as
needed with little effect
Page 34151 Report Printed: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
sten Depth
scan Tme
End Time
Dur (hr)
Phase
Op Cmin
M ity Care
Time P -T -X
Operetim
M)
End Depth (flKe)
9/6/2017
9/712017
3.00
PROD3
DRILL
DRLG
P
Continue drilling from 15,376', CWT =
15,376.0
15,407.0
21:00
00:00
-51K, WOB -.91K, rate in = 1.7 bpm,
experiencing low ROP - 10-20 fph;
samples from 15,386' showing signs
_
of clay, rig geo sent logs and cenfered
with town geology,decision made to
increase inclination to 96° and -
continue drilling ahead, looking for top
of C4, gamma wrapping with bit depth
of 15,436'
9/7/2017
9/7/2017
3.50
PRODS
DRILL
DRLG
P
Continue drilling ahead as per
15,407.0
15,440.0
00:00
03:30
geology, climbing to 96° inclination,
CWT = -51K, WOB = 1.51K, rate = 1.7
bpm, observed short ROP breakouts
up to 115 fph, gamma begins to wrap
at 15,405' (gamma tool depth)
9!7/2017
9/7/2017
0.40
PRODS
DRILL
DRLG
P
Confute drilling ahead at 15,440', CWT
15,440.0
15,443.0
03:30
03:54
-4K, WOB = 1.81K, drilling through
150+ API formation, TD called at
15,433', PUW = 47K
9/7/2017
9/7/2017
4.00
PROD3
DRILL
WPRT
P
Pump sweeps, circulate down coil, lay
15,443.0
83.0
03:54
07:54
-in beaded pill as per town request (50
bbl), perfrom swab WT.
Saw a little motor work, - 1k WOB and
- 4k overpull on CT @ 13,844
9/7/2017
9/7/2017
1.70
PRODS
DRILL
WPRT
P
RBIH to confirm formation pressure,
83.0
12,610.0
07:54
09:36
TD, and flags
9/7/2017
9/7/2017
0.30
PRODS
DRILL
DLOG
P
Tie in, drive by, PU 40 k lbs, RBIH, Tie
12,610.0
12,631.0
09:36
09:54
into K1 for+15' correction, Park at
12631.24 bit depth, Sensor depth
6114 TVD. Trap 3852 psi, watch it fall
to 3715 psi ( baker annular pressure)
calculated to 11.68 ppg and trending
down.
977/2017
977/2017
0.50
PROD3
DRILL
WPRT
P
RBIH to confirm formation pressure,
12,631.0
13,903.0
09:54
10:24
TD, and flags
set down
9812017
917/2017
0.30
PROD3
DRILL
WPRT
P
PU and RBIH pumping min weight,
13,903.0
13,507.0
10:24
10:42
Work pipe to 14,100', PUH, pulling
heavy, work pipe, squating and pulling
out of hole at 75 f1min, pulled up to
74k came free. pull up hole above the
fault. CT weight 39 k lbs above the
fault.
9/7/2017
977/2017
0.20
PRODS
DRILL
WPRT
P
RBIH, counter failed, did not notice for
13,507.0
13,661.0
10:42
10:54
3 minutes.
977/2017
977/2017
0.70
PRODS
DRILL
CLOG
T
Tum around, PU Wt 42 k PUH.
13,661.0
12,540.0
10:54
11:36
917/2017
9/7/2017
0.20
PRODS
DRILL
SVRG
T
Park and replace counter
12,540.0
12,540.0
11:36
11:48
9/7/2017
9/7/2017
0.20
PRODS
DRILL
DLOG
T
RBIH, tie into K1 + 13'
12,540.0
12,629.0
11:48
12:00
9/7/2017
9/7/2017
0.30
PROD3
DRILL
WPRT
T
Continue to RIH, drop rate prior to
12,629.0
13,661.0
12:00
12:18
crossing billets and left it at 0.4 bpm.
9/7/2017
9/7/2017
0.60
PRODS
DRILL
WPRT
P
Continue to RIH, see 2 WOB bobble
13,661.0
15,406.0
12:18
12:54
at 13,837 and 14,00'. Increase pump
rale to 1.2 below trouble area 13,400.
Slack coil weight @ 14,779' reduce
rate to 0.7 bpm, contiune on in hole.
Set down in hot gamma area, stack
2.25K WOB
- Page 35151 Report Printed: 9/27/2017
AM, Operations Summary (with Timelog Depths)
3M-27
qW
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
wart oepM
Sten Time
End Time
Dur (hr)
Phase
Op Coda
Activity Code
Time P-T-X
Operation
(I1M)
End Depth(ftKa)
9/7/2017
9/7/2017
3.60
FROM
DRILL
WPRT
P
PU, 49 k lbs
15,406.0
- 100.0
12:54
16:30
Pump beaded liner running pill start
PUH after letting - 6 bbis out the bit
Paint Yellow EDP flag @ 14178.2 in
tension
Chase liner running pill w KW
Pull through fault area, neg WOB
spikes from 13,875-13,833'.
Paint White window flag @ 10976.12'
continue to POOH.
9/7/2017
917/2017
1.50
FROM
DRILL
PULD
P
At surface flow check - good, PJSM,
100.0
0.0
16:30
18:00
LD BHA #30.
9/712017
9/7/2017
2.40
COMPZ3
CASING
PUTB
P
PJSM, PU AL2 Liner Run #1, (non-
0.0
1,653.0
18:00
20:24
ported bullnose, 31' pup, 4 jnts slotted
liner, 2 tracer pups, 36 jnts slotted, &
shorty deployment sleeve)
9/7/2017
9/7/2017
0.60
COMPZ3
CASING
PULD
P
PU BHA #31, AL2 Liner Running
1,653.0
1,697.0
20:24
21:00
Tools (CoilTmck), slide in cart, stab on
coil, bump up, set counters
9/7/2017
9/8/2017
3.00
COMM
CASING
RUNL
P
RIH with AL2 Liner Run #1, PUW is
1,697.0
13,844.0
21:00
00:00
42K at window, tie into window flag for
+15' correction
Stack weight at 13,600'- 13,844', work
pipe, PUW's = 45K-50K, up to
negativel OK WOB.
9/8/2017
9/8/2017
3.00
COMPZ3
CASING
RUNL
P
Continue RIH with AL2 Liner Run #1,
13,844.0
14,400.0
00:00
03:00
stack weight from 13,844'
through14,115', PUW's 45K-48K,
working liner at various speed,
significant time working past 14,124'&
14,345' (top of crest past Fault #1),
9/8/2017
9/8/2017
1.50
COMPZ3
CASING
RUNL
P
Continue working AL2 liner Run #1
14,400.0
15,410.0
03:00
04:30
towards bottom, slacking reduced
sigficantly froml4,530', experience
difficulty working liner past 15,073',
park, circulate at .25 bpm, attempt
again & get by, arrive at setting depth
(bottom at 15,410), bring up rate to
1.7 bpm, release off liner.
9/8/2017
9/8/2017
3.00
COMPZ3
CASING
TRIP
P
POOH, paint EDP flags
15,410.0
71.0
04:30
07:30
13,314' (yellow), & 13,270' (white), tie
into K1 for+5' correction
9/8/2017
9/8/2017
0.50
COMPZ3
CASING
PULD
P
At surface, PJSM, flow check - good,
71.0
0.0
07:30
08:00
LD liner running asembly over a dead
well, inspected pipe --20' good.
9/8/2017
9/8/2017
1.50
COMPZ3
CASING
PUTB
P
Prep floor for running liner, PU and
0.0
400.0
08:00
09:30
run 10 R3 joints 2-3/8" 4.6# L-80
slotted liner topped W two pups,
16.15' and an aluminum billet W -
openhole anchors, ported bullnose'on
bottom,
.. upper AL2 liner length -428.58
9/8/2017
9/8/2017
0.70
COMPZ3
CASING
PULD
P
PU / MU BHA #32 over a dead well,
400.0
- 489.8
09:30
10:12
1
1 tag up, set counters, open EDC,
9/6/2017
9/8/2017
2.90
COMPZ3
CASING
RUNL
P
RIH,
400.0
12,589.8
10:12
13:06
Tie in to window flag for+ 15.4'
correction.
Page 36151 Report Printed: 9127/2017
Operations Summary (with Timelog uepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Sled Time
End Tme
Der(hr)
phew
op Code
Ac!J ty Code
Tme P -T -X
Operation
(fiKB)
End Depth(MKa)
9/8/2017
9/8/2017
1.00
COMPZ3
CASING
RUNL
P
Down on pumps, Close EDC, PU Wt
12,589.8
13,759.0
13:06
14:06
42.5 k lbs
continue to RIH
Tie into K1 for+6.5' correction
Trip to bottom at 35 ft/min with 14k Ct
Wt, 0 WOB
S/D @ 13,759', WOB 3.38 k PU W142
RBIH, S/D @ 13,759', 3.3K WOB, PU
35 k to slack weight, WOB 1.6 k, slip
oriented 180 *ROHS.
Online with the pumps, sheared -
4500 psi. PU Wt 40k, WOB 0 k lbs
9/8/2017
9/8/2017
2.30
COMPZ3
CASING
TRIP
P
Park, reset counters, -POOH
13,759.0
70.0
14:06
16:24
9/8/2017
9/8/2017
1.00
COMPZ3
CASING
PULD
P
At surface, flow check - Good, PJSM,
13,759.0
70.0
16:24
17:24
LD BHA #32.
9/8/2017
9/8/2017
0.80
PROD4
DRILL
BOPE
P
Weekly BOP function test, good
0.0
0.0
17:24
18:12
9/8/2017
9/8/2017
1.10
PROD4
STK
PULD
P
PJSM, PU BHA #33, AL2 -1 lateral
0.0
78.0
18:12
19:18
drilling assembly (0 hr agitator, 0.5°
AKO X-Treme motor, RB Hughes bit),
slide in cart, stab on coil, check pack -
offs, good, check BHI counter, tag up,
set counters, open EDC
9/8/2017
9/8/2017
2.40
PROD4
STK
TRIP
P
Begin RIH with BHA #33, close EDC
78.0
12,605.0
19:18
21:42
-
at 500', bring up rate, surface lest
agitator, good
9/8/2017
9/8/2017
0.30
PROD4
STK
DLOG
P
Tie into K1 to +18' correction, park,
12,605.0
12,649.0
21:42
22:00
open EDC
9/8/2017
9/8/2017
1.50
PROD4
STK
DISP
P
Circulate hole to drilling fluid, observe
12,649.0
12,669.0
22:00
23:30
significant cuttings coming over
shakers, observe small "plastic"
looking material/shavings mixed with
cuttings R beads, shut down pumps,
Gose choke, close EDC
9/8/2017
9/8/2017
0.30
PROD4
STK
TRIP
P
Continue RIH, tag TOB at 13,327',
12,669.0
13,327.0
23:30
23:48
PUW = 42K
9/8/2017
9/9/2017
0.20
PROD4
STK
KOST
P
Bring rate up to 1.8 bpm, FS = 812
13,327.0
13,327.0
23:48
00:00
psi, begin kicking off billet at 150"
ROHS, CWT = 14K, WOB =.7K,
annular = 3900 psi, WHP = 0 psi, circ
pressue = 4938 psi,
9/9/2017
9/9/2017
2.20
PROD4
STK
KOST
P
Continue to KO billet at 13,227', FS =
13,327.0
13,337.0
00:00
02:12
860 psi, CWT = 14.3K, WOB =.55K.
annular = 3907 psi, WHP = 0 psi,
aluminum over shakers
9/9/2017
9/9/2017
1.80
PROD4
DRILL
DRLG
P
Off billet w/o issue, drilling in
13,337.0
.13,500.0
02:12
04:00
formation, CWT = 1 OK, WOB = 1.5K,
rate in = 1.8 bpm, annular = 3893 psi,
dry drift billet up R down, clean
WOB spike at 13,426' of 3852 psi, PU,
FS down by -50 psi, bore pressure
down by - 70 psi of bottom, continue
drilling ahead watching parameters,
similar event occured at 13,485'
Page 37/51 Report Printed: 9/27/2017
,. Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
81ert Depm
Start Time
End Time
Dw(hr)
Phase
Op Oode
Activity Code
Time P -T -X
Opemexi
(RKB)
End Depth(eKB)
9/9/2017
9/9/2017
0.50
PROD4
DRILL
DRLG
P
PUW = 50 K, BHA wiper, losses
13,500.0
13,538.0
04:00
04:30
began at 13,494', losing -.37 bpm,
continue drilling, FS =850 psi, CWT =
9K, WOB = .43K, rate in = 1.76 bmp,
rale out = 1.58 bpm, losses appear to
be healing with continued drilling,
experience difficulty, obtaining survey
9/9/2017
9/9/2017
0.50
PROD4
DRILL
WPRT
T
Difficulty obtaining a clean survey,
13,538.0
13,538.0
04:30
05:00
PUH in attempt to get survey as per
DD, no luck, RBIH to continue drilling
in attempt to obtain clean survey.
9/9/2017
9/9/2017
1.00
PROD4
DRILL
DRLG
P
BOBD, FS = 829 psi, obtained clean
13,538.0
13,600.0
05:00
06:00
survey at 13,513', CWT = 8K, WOB
2.6K,
9/9/2017
9/9/2017
0.20
PROD4
DRILL
WPRT
T
PU, in attempt to re log missed
13,600.0
13,473.0
06:00
06:12
surveys
9/9/2017
9/912017
0.60
PROD4
DRILL
WPRT
T
RBIH , attempt to pick up missed
13,473.0
13,600.0
06:12
06:48
surveys. caught enough to continue
drilling with in parameters.
9/9/2017
9/9/2017
2.30
PROD4
DRILL
DRLG
P
Attempted to vary pump rate to clean
13,600.0
13,771.0
06:48
09:06
-
up surveys, no vibrations, not pump
related. Appears to be interference
from the AL2 liner that we just set.
Ct RIHWt 10 k lbs, 1.76 bpm in/1.68
bpm out, CT 4747 psi, free spin 770
psi.
OBD, WOB 1.5 to 2.5 k lbs, ROP 30-
220 ftrnr, ROPs increased - 13650
Send 5x5 sweep to time out for wiper
Average over interval 74 Thr
9/9/2017
9/9/2017
0.30
PROD4
DRILL
WPRT
T
Wiper trip #1, PU 48 k lbs, PU after
13,771.0
13,350.0
09:06
09:24
5x5 exited the bit, PUH atempting to
relog the misses surveys. No sucess.
9/9/2017
9/9/2017 -
0.40
PROD4
DRILL
WPRT
T
RBIH
13,350.0
13,771.0
09:24
09:48
9/9/2017
9/9/2017
0.50
PROD4
DRILL
DRLG
P
Ct RIHWt 10 k Ibs,1.75 bpm in /1.67
13,771.0
13,827.0
09:48
10:18
bpm out, Ct 4840 psi, diff 807 psi,
OBD, CT Wt 7 k lbs, WOB 2 k lbs,
ROP 100 ft/hr
9/9/2017
9/9/2017
5.20
PROD4
DRILL
DRLG
P
Stack 3.46 k WOB @ 13,827'- no
13,827.0
14,020.0
10:18
15:30
motor work
PU, 50 k attempt to restart, high
weight on bit, low diff.
PU and try again, 47 k PU Wt, same
results
PU 49 k, 100' BHA wiper, RBIH
Got a bite, making hole, lost Ct Wt
Ct Wt 2.5 k, WOB 2 k lbs, ROP initially
100 ft/hr then tapered off rapidly to 50
then 30 ft/hr, Inc fell from 93 to 89°
while drilling ahead.
Got the call @ 12:50 - 13,934' to turn
straight up.
Having a hard time building angle.
Weight transfer diminishing.
Page 38151 Report Printed: 9/27/2017
,. Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Brad Cepm
Btad Tune
End Time
Dw Ile)
Phsee
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
rW Depth(8Ka)
9/9/2017
919/2017
0.30
PROD4
DRILL
DRLG
P
PU and reduce rate to try and build
14,020.0
14,030.0
15:30
15:48
more angle.
1.53 bpm in/1.44 bpm out, CT 4288
psi, Diff 682 psi,
Trying to target 2.5 k to 3 k WOB
Ct wt -5 k lbs, WOB 1.99 k
9/9/2017
9/9/2017
1.00
PROD4
DRILL
WPRT
P
Pump 5 x5 sweep PU Wt 42 k lbs,
14,030.0
12,752.0
15:48
16:48
PUH while sweeps travel to bit, pull to
13,855' Saw neg WOB spike
13,865' RBIH timing sweeps to exit
near bottom, RIH Wt 10 k lbs
PUH chasing sweeps on wiper trip
through the build, saw motor work
12,880'
9/9/2017
9/9/2017
0.30
PROD4
DRILL
WPRT
P
RBIH
12,752.0
14,030.0
16:48
17:06
9/9/2017
9/9/2017
1.40
PROD4
DRILL
DRLG
P
Try reduced rate and increased WOB
14,030.0
14,065.0
17:06
18:30
to build angle, confered with town,
decison made to POOH and PU
-
higher bend motor and new bit, pump
sweeps
9/9/2017
9/912017
3.50
PROD4
DRILL
TRIP
T
POOH, PUW = 45K, observe a bit of
14,065.0
78.0
18:30
22:00
motor work at —12,892' in build, park
at 12,574', shut down pumps, close
choke, open EDC, continue POOH,
Gose EDC, surface lest agitator, good,
tag up, space out (PJSM)
9192017
9/9/2017
1.80
PROD4
DRILL
PULD
T
PUD BHA#33, checks not holding,
78.0
0.0
22:00
23:48
gather crew, quickly talk through PUD
check list contingency for checks not
holding, complete PUD, Hughes bit
came out a 3-1
9/9/2017
9/10/2017
0.20
PROD4
DRILL
PULD
T
Reconfigure BHA, PJSM, begin PD
0.0
0.0
23:48
00:00
BHA #34 (same agitator, 0.6+o AKO
motor, RB HYC B8 Edge bit)
9/10/2017
9/10/2017
1.30
PROD4
DRILL
PULD
T
Complete PD BHA #34 (agitator, 0.6`+
0.0
78.0
00:00
01:18
AKO motor, RB HYC B8 Edge bit),
slide in can, stab coil, check pack -offs,
open EDC, tag up, set depth counters
9/10/2017
9/102017
2.40
PROD4
DRILL
TRIP
T
Begin RIH with BHA#34, close EDC,
78.0
12,587.0
01:18
03:42
test agitator at 500', good, continue
RIH
Note: Crew performed "Spill Drill",
excellent response time &
communication
9/10/2017
9/10/2017
0.20
PROD4
DRILL
DLOG -
T
Log Kt for +11' correction
12,587.0
12,638.0
03:42
03:54
9/10/2017
9/10/2017
0.50
PROD4
DRILL
TRIP
T
Continue RIH
12,638.0
14,050.0
03:54
04:24
9/10/2017
9/10/2017
2.60
PROD4
DRILL
DRLG
P
Tag bottom at 14,050'( higher than
14,065.0
14,210.0
04:24
07:00
expected (expected 14,065'),
attempting to build, pumping 1.4 bpm,
FS=665 psi, CWT =4K, WOB=
3.5K, annular = 3916 psi, unable to
drill ahead,
PU, bring up rale to 1.8 bpm, RSIH to
14,065 (expected bottom depth), FS =
1000 psi, CWT = 8.5K, WOB = 2K
Page 39151 Report Printed: 912712017
Operations Summary (with Timelog Uepths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
I
Start. Time
End T.
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
Me)
End Deplh(IRKS)
9/10/2017
9/10/2017
1.60
PROD4
DRILL
DLOG
T
PU Wt40 k lbs PU to catch missed
14,210.01
14,127.0
07:00
08:36
survey. No success. Slow tripping
rate, slow pump rate, park. No -
success. Pull up hole to re shoot old
surveys, no success. Troubleshoot
tools, research magnetic storm info, all
indications are a tool failure.
9/10/2017
9/10/2017
1.70
PROD4
DRILL
TRIP
T
Decision made to trip for tool
14,127.0
6,036.0
08:36
10:18
PUH into casing, Open EDC, Pump
2.20 bpm and POOH
9/10/2017
9/10/2017
1.70
PROD4
DRILL
TRIP
T
Pipe pin holed as it came across the
6,036.0
88.0
10:18
12:00
goose neck. - 6030' pin hole -15' off
end of goose neck.
Parked, down on pumps, bled
pressure, upper checks holding.
Eased coil onto the storage reel and
marked hole with paint.
Continued out of hole.
9/10/2017
9/10/2017
1.50
PROD4
DRILL
PULD
T
Bump up, PUD +LD BHA #34
88.0
0.0
12:00
13:30
9/10/2017
9/10/2017
0.50
PROD4
DRILL
CTOP
T
Clean floor, install nozzle and stab on.
0.0
0.0
13:30
14:00
9/10/2017
9/10/2017
3.00
PROD4
DRILL
DISP
T
Line up coil to displace Power Pro w
0.0
0.0
14:00
17:00 -
water, -0.5 bpm, 1100 psi, returns to
the pit.
HES N2 PJSM and dg up.
9/10/2017
9/10/2017
1.50
PROD4
DRILL
DISP
T
Water back to the pits, divert retums
0.0
0.0
17:00
18:30
to the TT, Halliburton cooling down PT
to 3,500 psi., blow down surface lines
& reel with N2, bleed down WHP &,
coil pressure, HES rig down
9/10/2017
9/10/2017
2.70
PROD4
DRILL
CTOP
T
Pumping managed pressure (1000
0.0
0.0
18:30
21:12
psi), align inner reel iron, slide back
cart, lock out & chain reel, lock out
injector, remove bulkhead & inner reel
iron, cut a-line, remove depth counters
Peak moved reel #5772 to 1 ES by
20:00 him to begin MU plates &
spacers.
Notification given to AOGCC for early
BOPE test (10:00am 9111), witness
waived by Jeff Jones.
9/10/2017
9/11/2017
2.80
PROD4
DRILL
CTOP
T
PJSM, install grapple, pull test,
0.0
0.0
21:12
00:00
unstab, wind up, & secure coil in prep
for reel swap, cut coil
9/11/2017
9/11/2017
3.00
PROD4
DRILL
CTOP
T
PJSM, stack cable, unlock reel, rig up
0.0
0.0
00:00
03:00
shackles/slings, remove saddle
clamps,
9/1112017
9/11/2017
2.30
PROD4
DRILL
CTOP
T
PJSM, Lift reel from saddles, drop
0.0
0.0
03:00
05:18
hubs & spacers, SIMIPS remove
stripper, inspect brass
Note: Losing -1 bbl/hr pumping MP
9/11/2017
9/11/2017
6.70
PROD4
DRILL
CTOP
T
Remove & replace A-frame, Cut
0.0
0.0
05:18
12:00
remaining coil in pipe shed, clean
stripper and replace brass.
Page 40151 Report Printed: 912712017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
EmInme
Dw(hr)
Phase
op Cmis
Adivk Code
Time P -T -X
Operation
(WEI)
End Depth MKB)
9/11/2017
9/11/2017
6.00
PROD4
DRILL
CTOP
T
Flush lines, remove and replace R1
0.0
0.0
12:00
18:00
and R3, Re install stripper brass,
PJSM, Load storage reel onto Peak
bed truck. Crew change
9/11/2017
9/11/2017
4.00
PROD4
DRILL
CTOP
T
pick up stripper and QTS, skid cart,
0.0
0.0
18:00
22:00
install night cap, grease stack and
valves, central shops valve crew
greased tree valves, Flood up.
9/11/2017
9/12/2017
2.00
PROD4
WHDBOP
BOPE
P
BOP Start time 10:00 - Wintess
0.0
0.0
22:00
00:00
waived by Jeff Jones AOGCC
Test #1, swab - good
Test #2, Lower blind, TV2 - good
Test #3, TV1, - good
Test #4, Upper blind, B1&5, C
4,5,8,&12, Rt, Bleederl - good
Test #5, C 3,6,7,&11 B2&6 and T2 -
ran out 5 min -good
Test #6, Manual ChokeD and Super
Choke C, -good
Test #7, C2, 10 and T 1 - good
Test #8, R1, Bleeder 2, Charlie 1 &9 -
good
9/12/2017
9/12/2017
3.00
PROD4
WHDBOP
BOPE
P
Continue BOPE test
0.0
0.0
00:00
03:00
Test #9, Bravo 4 &8, Romeio 3, &.
Bleeder 3 - good
Test #10, Bravo 3 & 7 - good
Test #11, annular BOP, - good
Test #12, Upper 2-3/8" pipe slip rams,
upper TI W valve - good
Test #13, Lower 2-3/8" pipe slip rams -
good
Test #14, Lower 2" pipe slip rams -
fail/pass
Test #15, Upper 2" pipe slip rams,
lower TIW valve - good
Accumulator draw down test, good
No inner reel iron test, waiting on reel
Test complete in 5 his.
9/12/2017
9/12/2017
3.00
PROD4
DRILL
CTOP
T
Blow down chokes, clean down lower
0.0
0.0
03:00
06:00
mast, inspect chokes, grease R1, 2, &
3, lay down test joint, install spacer on
hub, prepping CTS counter for reel
install
9/122017
9/12/2017
4.00
PROD4
DRILL
CTOP
T
Continue prepping to ensure rig is
0.0
0.0
06:00
10:00
ready for reel install, change out
rubber on inner reel iron, various rig
cleaning projects...
9112/2017
9/12/2017
8.00
PROD4
DRILL
CTOP
T
Installed rebuild INJH counter
0.0
0.0
10:00
18:00
assembly, prep/dress grapple
connector for new coil, install spacer
plate on reel motor hub, clean INJH
blocks, stock pits with sack products,
two hands went to Deadhorse to help
with reel mods, Build Bulk Head, test
gas alarms, inspect lighting around rig,
inspect elevators, work on work
-
orders, and mop around ng. Make trip
to Deadhorse to inspect work on
spool.
Page 41151 Report Printed: 9/27/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Stars Tvae
End Tana
Disair)
Phase
Op code
Acbviy Cade
Time P -T -X
Operation
(0KB)
End Depth(NKB)
9/12/2017
9/12/2017
1.50
PROD4
DRILL
SFTY
T
Hold Nabors global safety week kick
0.0
0.0
1800
19:30
off meeting / CTD performance YTD
with Patrick Doherty and Kazeem
Adegbola
9/12/2017
9/13/2017
4.50
PROD4
DRILL
CTOP
T
Prep reel area for new spool, Service
0.0
0.0
19:30
00:00
level wind, Clean gripper blocks,
Change oil in right angle drives. Work
orders
9/13/2017
9/13/2017
6.00
PROD4
DRILL
CTOP
T
Continue prepping for next reel install
0.0
0.0
00:00
06:00
9/13/2017
9/13/2017
10.00
PROD4
DRILL
CTOP
T
Torqued up all pillow block bolts, put
0.0
0.0
06:00
16:00
together all tools and parts for intalling
hubs, inspected SRL's and replaced
tie back lines, inspected all re -heading
equipment, hooked back up drawwork
camera, sent 2 rig hands to
Deadhorse to assist on spool mods,
shipped all tubing cribbage back to
warehouse.
9/13/2017
9/13/2017
2.00
PROD4
DRILL
CTOP
T
Replace INJH motor #2 with new style
0.0
0.0
16:00
18:00
coupler
9/13/2017
9/1312017
1.50
PROD4
DRILL
CTOP
T
Crew change, continue replacing
0.0
0.0
18:00
19:30
coupler on motor # 2
9/13/2017
9/13/2017
2.00
PROD4
DRILL
CTOP
T
New CT string on location. Swap out
0.0
0.0
19:30
21:30
nuts on hub adapters and double
check torque.
9/13/2017
9/14/2017
2.50
PROD4
DRILL
CTOP
T
Coupler upgrade complete. Spot in,
0.0
0.0
21:30
00:00
reel on flatbed and rig up to pick. Pick
_
up string and install. Torque up saddle
clamps, Rig up stabbing grapple to CT
and pull test
9/14/2017
9/14/2017
2.50
PROD4
DRILL
CTOP
T
Pull CT into injector, Rig down
0.0
0.0
00:00
02:30
stabbing cable. Trim 7' of coil to find
wire. Test wire, 550 MOhmes, 50.1
Ohmes Good test
9/14/2017
9/14/2017
3.50
PROD4
DRILL
CTOP
T
PJSM to install inner reel iron and CT
0.0
0.0
0230
06:00
connector - Prep CT for CT connector
and install.
9/14/2017
9/14/2017
8.50
PROD4
DRILL
CTOP
T
Crew change, install bulkhead (5/16 th
0.0
0.0
06:00
14:30
cable) and junction box, line up wash
pipe inside reel, with new clamp,
check inner reel iron and secure, head
-up BHI upper quick, change pac-offs,
stab INJH, fluid pack reel
9/14/2017
9/14/2017
0.80
PROD4
WHDBOP
BOPE
T
Test and chart inner reel and stripper
0.0
0.0
14:30
15:18
test
9/14/2017
9/14/2017
1.00
PROD4
DRILL
CTOP
T
Displace reel to drilling fluid, PT CTC
0.0
0.0
15:18
16:18
4,000 psi
9/1412017
9/14/2017
1.50
PROD4
DRILL
PULD
T
PJSM, MU/PD drilling BHA# 35m M/U
0.0
78.2
16:18
17:48
to coil and surface test, Start BHI NPT
@16:55
9/14/2017
9/14/2017
3.30
PROD4
DRILL
TRIP
T
Trip in well, No CTK depth, plug in
78.2
12,171.0
17:48
21:06
encoder, @ 11895' CTES EOP
counters are off - 100'. Injector
_
counters off depth, Clean counters on
way in hole. New CT string appears to
have an anti corrosion coating
allowing counters to slip
Page 42151 Report Printed: 9/2712017
Operations Summary (with Timelog Depths)
3M-27
s
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
TiYtie Log
sbn Oepm
start Tie
Ertl Tune
Our (hr)
Phase
Op Code
Activity CDde
Time P -T-%
Opembon
(Po(B)
End Depth (ftKB)
9/14/2017
9/14/2017
0.70
PROD4
DRILL
DLOG
T
Log RA for+424'Again clean
12,171.0
12,330.0
21:06
21:48
-
counters, CT still has some coating on
it
9/14/2017
9/14/2017
1.50
PROD4
DRILL
TRIP
T
Continue in hole, Perform check
12,330.0
14,179.0
21:48
23:18
surveys, slow doom to get gamma
info to compare with earlier logs
13874 to 13890'- Depths off
9/14/2017
9/1512017
0.70
PROD4
DRILL
WPRT
P
14179 appears to be bottom, Come up
14,179.0
13,752.0
23:18
00:00
to 1.5 BPM, wiper up hole circulating
drilling Fluid, cleaning up CT string,
PUW=40K, Start dragging heavy @
14009, RBIH, PUH pulling 50-55K
1400910 13752 END BHI NPT @.
23:19 for 6.4 Hrs
*" TT NPT BHI MWD DGS 11.0 hrs
9/15/2017
9/15/2017
0.20
PROD4
DRILL
WPRT
P
Continue up hole to tie into gamma
13,752.0
13,630.0
00:00
00:12
signature @ 13850'
9/15/2017
9/15/2017
0.30
PROD4
DRILL
WPRT
P
RBIH, Setdown @ 13842, Attemp to
13,630.0
13,840.0
00:12
00:30
tie in sticky hole conditions preventing
maintaining logging speed
9/15/2017
9/15/2017
0.40
PROD4
DRILL,
WPRT
P
Wiper up hole to log RA, PUW=40K
13,840.0
12,650.0
00:30
00:54
9/15/2017
9/15/2017
0.40
PROD4
DRILL
DLOG
P
Log RA for +30.5' correction
12,650.0
12,727.0
00:54
01:18
9/15/2017
9/15/2017
1.30
PROD4
DRILL
WPRT
P
Wipe back in hole, redo check shot
12,727.0
14,210.0
01:18
02:36
surveys
9/15/2017
9/15/2017
4.00
PROD4
DRILL
DRLG
P
14,210', Tag bottom where it is
14,210.0
14,341.0
02:36
06:36
supposed to be. 13,850 to 14,000'
area has cleared up. Drill ahead 1.8
BPM @ 5286 PSI FS, BHP=4260,
RIW=-2K, DHWOB=1K, WHP=O,
ECD=12.8, ROP 40 to 65 FPH
New Mud at the bit 14,336'
*`* Old Mud stats; 1,546' DF, 0.75%
DS
9/15/2017
9/15/2017
0.50
PROD4
DRILL
WPRT
T
PUH, dirty surveys (Solar Activity),
14,341.0
14,341.0
06:36 -
07:06
perfrom check shots, unable to get
clean survey's, confer with town,
phone in survey IFR to Sperry
Drilling/Haliburton survey
management analyst
9/15/2017
9/15/2017
1.50
PROD4
DRILL
DRLG
P
BOBD, 1.8 bpm at 4,750 psi, BHP
14,341.0
14,354.0
07:06
08:36
3,970, WHIP 20, IA 0, OA 417,
CTSW=2 k, DHWOB=1.5 k, ROP 10
fph
9/15/2017
9/15/2017
0.25
PROD4
DRILL
WPRT
T
PUH, perform check shots, getting
14,354.0
14,354.0
08:36
08:51
clean survey's, RBIH
9/15/2017
9/15/2017
3.25
PROD4
DRILL
DRLG
P
BOBO, 1.8 bpm at 4,715 psi, BHP
14,354.0
14,490.0
08:51
12:06
3,973, WHP 20, IA 0, OA 417,
CTSW=O k, DHWOB=1.0 k, ROP 51
fph
9/15/2017
9/15/2017
0.20
PROD4
DRILL
WPRT
T
PUH, dirty surveys (Solar Activity),
14,490.0
14,490.0
12:06
12:18
perfrom check shots, able to get clean
surveys
Note: Kick wihile drilling drill
Page 43151 ReportPrinted: 912 712 01 7
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
Start Time
Erq Tna
Dw(hr)
Phase
Op Code
Ar Ry Cone
Time P -T -x
operaw
(MB)
End Depth (WS)
9/15/2017 -
9/15/2017
2.85
PROD4
DRILL
DRLG
P
BOBD, 1.8 bpm at 4,715 psi, BHP
14,490.0
14,595.0
12:18
15:09
4,010, WHP 24, IA 0, OA 454,
CTSW=1.7 k, DHWOB=1.5 k, ROP 60
fph
9/15/2017
9/15/2017
0.50
PROD4
DRILL
WPRT
P
Wiper up hole to 13,850', PUW 34 k
14,595.0
13,850.6-
15:09
15:39
9/1512017
9/15/2017
0.20
PROD4
DRILL
DLOG
P
Log up to check depth from 13,915 -
13,850.0
13,915.0
15:39
15:51
1
13,872', depth ok
9/15/2017
9/15/2017
0.50
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW 2 k.
13,915.0
14,595.0
15:51
16:21
9/15/2017
9/1512017
0.25
PROD4
DRILL
DRLG
P
BOBD, 1.8 bpm at 4,610 psi, BHP
14,595.0
14,695.0
16:21
16:36
4,145, WHP 24, IA 0, OA 456,
CTSW=minus 2 k, DHWOB=minus 5.9
k, ROP 30 fph
9/15/2017
9/15/2017
0.50
PROD4
DRILL
WPRT
T
Counter locked up, wiper up hole to
14,595.0
12,720.0
16:36
17:06
log RA marker for depth control,
PUW=35K
9/15/2017
9/15/2017
0.20
PROD4
DRILL
DLOG
T
Log Tie in for+9.5' correction
12,720.0
12,571.0
17:06
17:16
9/152017
9/1512017
0.80
PROD4
DRILL
WPRT
'T
Wiper back in hole to drill
12,571.0
14,603.0
17:18
18:06
9/15/2017
9/1512017
1.90
PROD4
DRILL
DRLG
P
14603', Drill, 1.77 BPM @ 4835 PSI
14,603.0
14,640.0
18:06
20:00
FS, BHP=4090, RIW=1.7K,
DHWOB=.8K
9/15/2017
9/1512017
0.20
PROD4
DRILL
WPRT
P
Pull BHA wiper, PUW=37K
14,640.0
14,640.0
20:00
20:12
9/15/2017
9/16/2017
3.80
PROD4
DRILL
DRLG
P
14640', Drill, 1.79 BPM @ 4735 PSI
14,640.0
14,759.0
20:12
00:00
FS, BHP=4735
9/16/2017
9/16/2017
4.40
PROD4
DRILL
DRLG
P
14,759', Drill ahead, 1.78 BPM @
14,759.0
14,858.0
00:00
04:24
4735 PSI FS, BHP=3950, RIW=-4.8K,
DHWOB=I.2K
9/1612017
9116/2017
0.20
PROD4
DRILL
WPRT
P
Pull BHA Wiper, PUW=34K, Stacking,
14,858.0
14,858.0
04:24
04:36
low surface weight, Low ROP, tough
getting back to bottom, pull 1 00'trip
9/16/2017
9116/2017
1.50
PROD4
DRILL
DRLG
P
14858, Drill, 1.79 BPM @ 4752 PSI
14,858.0
14,907.0
04:36
06:06
FS, BHP=3955, RIW=2.55K off bottom
.
9/16/2017
9/162017
2.00
PROD4
DRILL
DRLG
P
Lower pump rate to gain ROP. PUW
14,907.0
14,959.0
06:06
08:06
35 k, 1.5 bpm at 4,070 psi FS, IA 0,
OA 523BHP 3,940, WHP 0, CTSW
-
minus 2.0 k, DHWOB=0.3 k, ROP 29
fph
9/16/2017
9/16/2017
2.50
PROD4
DRILL
DRLG
P
PUH, by-pass screens, pump 20
14,959.0
15,000.0
08:06
10:36
beads x 20 active x 20 beads, BOBD,
1.81 bpm at 5,170 psi, BHP 4,045,
WHP 0, IA 0, OA 524, CTSW=minus
2.0 k, DHWOB 0.4 k, IA 0, OA 523
9/16/2017
9/16/2017
0.50
PROD4
DRILL
WPRT
P
Wiper up hole to 14,000', PUW 34 k
15,000.0
14,000.0
10:36
11:06
9/16/2017
9/16/2017
0.50
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW 1.0 k,
14,000.0
15,00o.0
11:06
11:36
9/16/2017
9/16/2017
0.20
PROD4
DRILL
DRLG
P
BOBD, 1..79 bpm at 5,025 psi FS,
15,000.0
15,007.0
11:36
11:48
BHP 4,055, WHIP 0, CTSW=minus 2.0
k, DHWOB=0.6 k, IA 0, OA 522
9/16/2017
9/16/2017
1.00
PROD4
DRILL
WPRT
P
Packing off, annular pressure
15,007.0
12,720.0
11:48
12:48
increased 200 psi, wiper up hole for a
tie in, pump 5x5 sweep, clean EOB
Page 44151 Report Printed: 9/27/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Tune
Emi Time
Dur (hr)
Phase
op cm1e
A,xlrity Cotle
Time P -T -X
Operation
(RKa)
End Depth ME)
9/16/2017
9/16/2017
0.20
PROD4
DRILL
DLOG
P
Log RA correction of plus 10.5'
12,720.0
12,754.0
12:48
13:00
9/16/2017
9/16/2017
0.70
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW minus 2.0 k
12,754.0
15,015.0
13:00
13:42
9/16/2017
9/16/2017
1.60
PROD4
DRILL
DRLG
P
BOBO, 1.82 bpm at 5,250 psi, BHP
15,015.0
15,037.0
13:42
15:18
4,105, WHP 0, IA 0, OA 522,
CTSW=1.0 k, DHWOB=0.6 k, ROP 21
fph
9/16/2017
9/16/2017
0.20
PROD4
DRILL
WPRT
P
P/U for weight transfer / slight packing
15,037.0
15,037.0
15:18
15:30
off, PUW=45K
9/16/2017
9/16/2017
2.80
PROD4
DRILL
DRLG
P
15037', Drill, 1.42 BPM @ 404OPSI
15,037.0
15,119.0
15:30
18:18
FS, BHP=4065, RIW=-7K @ 1.4K
DHWOB
9/16/2017
9/16/2017
1.30
PROD4
DRILL
WPRT
P
Pull 100' wiper, PUW=39K, Cannot
15,119.0
15,119.0
18:18
19:36
get back to bottom. Pull 1000' wiper
9/16/2017
9/16/2017
2.40
PROD4
DRILL
DRLG
P
15117', Drill, 1.77 BPM @ 5022 PSI
15,119.0
15,153.0
19:36
22:00
FS, BHP=4051, RIW=-2K @ 1.2K
DHWOB, Pump 10 BBI beaded pill @
19:45
9/16/2017
9/16/2017
0.30
PROD4
DRILL
WPRT
P
Pull 100'wiper, PUW=35K
15,153.0
15,153.0
22:00
22:18
9/16/2017
9/17/2017
1.70
PROD4
DRILL
DRLG
P
15153', Drill, 1.69 BPM @ 4700 PSI
15,153.0
15,186.0
22:18
00:00
FS, BHP=4032, RIW=-2K @ 1K
DHWOB
9/17/2017
9/17/2017
0.30
PROD4
DRILL
DRLG
P
Continue drilling ahead, 1.69 BPM @
15,186.0
15,188.0
00:00
00:18
4700 PSI FS, BHP=4037
9/17/2017
9/17/2017
0.20
PROD4
DRILL
WPRT
P
Low weight, Pull 100' BHA wiper,
15,188.0
15,188.0
00:18
00:30
PUW=34K
9/17/2017
9/17/2017
0.90
PROD4
DRILL
DRLG
P
15188 Drill, 1.67 BPM @ 4772 PSI
15,188.0
15,200.0
00:30
01:24
FS, BHP=4066, RIW -4.5K @ 1.4K
DHWOB
9/17/2017
9/17/2017
0.30
PROD4
DRILL
WPRT
P
Low weight, Pull 100'13HAwiper,
15,200.0
15,200.0
01:24
01:42
PUW=35K
9/17/2017
9/17/2017
1.50
PROD4
DRILL
DRLG
P
15200', Drill. 1.67 BPM @ 4787 PSI
15,200.0
15,211.0
01:42
03:12
FS, BHP=4066 Pumped 10 BBI
beaded pill @ 2:31
9/17/2017
9/17/2017
1.00
PROD4
DRILL
WPRT
P
1 00'Wiper, PUW=34K, Got back to
15,211.0
15,211.0
03:12
04:12
bottom and could not get drilling, Pull
400' wiper, PUW=32K, Pumped 10
BBI Beaded pill 3:05 and 4:00
9/17/2017
9/17/2017
2.20
PROD4
DRILL
DRLG
P
15211', Drill, 1.69 BPM @ 7987 PSI
15,211.0
15,224.0
04:12
06:24
FS, BHP=4097
9/17/2017
9/17/2017
0.30
PROD4
DRILL
WPRT
P
200', wiper up hole, PUW 31k, pump
15,224.0
15,224.0
06:24
06:42
5x5 low/high
9/1.7/2017
9/17/2017
8.00
PROD4
DRILL
DRLG
P
15,224, BOBO 1.40 bpm at 3950 psi
15,224.0
15,305.0
06:42
14:42
FS, BHP 4000, WHP 0, IA 0, OA 535,
CTSW=minus 7.0 It, DHWOB=2 k,
ROP=1.7 k, low ROP, weight transfer
issues.
9/17/2017
9/17/2017
0.50
PROD4
DRILL
WPRT
P
Pump 10x10 sweep, clean hole
15,305.0
15,305.0
14:42
15:12
9/17/2017
9/17/2017
4.50
PROD4
DRILL
TRIP
P
POOH, laying in 45 bbls beaded pill,
15,305.0
71.6
15:12
19:42
perform 300' jog from 550 feet. No
additional cuttings over the shaker
9/172017
9/17/2017
1.70
PROD4
DRILL
PULD
P
At surface, PJSM, PUD BHA #35
71.6
0.0
19:42
2124
Page 45151 Report Printed: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Tkm
Dur(hr)
Phase
Op code
Ac" Code
Time P-T-X
Operation
(WB)
End Depth MR)
9/17/2017
9/17/2017
2.40
PROD4
DRILL
PULD
P
PJSM, M/U lower section of tool, FVS,
0.0
78.2
21:24
23:48
agitator, 2 318".5' motor, RR HYC bit.
PD BHA #36. Check pack offs,
Change out checks in UQC. M/U to
coil and surface test. Strip on well
9/17/2017
9/18/2017
0.20
PROD4
DRILL
TRIP
P
Trip in well, shallow test agitator,
78.2
400.0
23:48
00:00
continue in well
9118/2017
9/18/2017
2.20
PROD4
DRILL
TRIP
P
Continue in well after shallow agitator
400.0
12,595.0
00:00
02:12
test
9/18/2017
9/182017
0.20
PROD4
DRILL
DLOG
P
Log K1 for +7.6, PUW=29K
12,595.0
12,622.0
02:12
02:24
9/18/2017
9/182017
2.00
PROD4
DRILL
TRIP
P
Continue in well, clean pass through
12,622.0
15,315.0
02:24
04:24
window, clear through 13850 to
14,000'. Last 30'tight hole conditions
with low surface weight, DHWOB with
no differential pressure. Annular
pressure fluctuating. Multiple pick ups
to work to bottom
9/18/2017
9/182017
5.50
PROD4
DRILL
DRLG
P
15315', Drill, 1.62 BPM @ 4863 PSI
15,315.0
15,382.0
04:24
09:54
FS, BHP=4228, DHWOB=1.4K RIW=-
4.6K
BHA Wipers
15328',15340', 15357',15372,15382'.
PUW 35-38 k
9/182017
9/18/2017
0.50
PROD4
DRILL
CIRC
P
Pump 1 0x1 0 sweep, followed by
15,382.0
15,366.0
09:54
10:24
beaded drilling fluid pill
9/182017
9/18/2017
2.85
PROD4
DRILL
WPRT
P
POOH, laying in drilling fliud beaded
15,366.0
1,533.0
10:24
13:15
pill, little motor work as well as over
pulls lhru 13850' area, continue POOH
Perform 300' jog at 1,500'
9/18/2017
9/18/2017
0.15
PROD4
DRILL
SVRG
P
Adjust goose neck
1,533.0
1,533.0
13:15
13:24
9118/2017
9/18/2017
0.40
PROD4
DRILL
WPRT
P
Continue wiper to surface, testing
1,533.0
78.2
13:24
13:48
agitator (good test)
9/18/2017
9/18/2017
0.15
PROD4
DRILL
TRIP
P
At surface, re-set counters
78.2
78.2
13:48
13:57
9/1812017
9/18/2017
2.00
PROD4
DRILL
TRIP
P
RBIH, to confirm TD
78.2
12,600.0
13:57
15:57
9/18/2017
9/18/2017
0.25
PROD4
DRILL
DLOG
P
Log the K1 marker correction of plus
12,600.0
12,644.0
15:57
16:12
1
4.5'
9/1812017
9/18/2017
0.25
PROD4
DRILL
TRIP
P
PUW 28 k, continue IH, perform static
12,644.0
12,710.0
16:12
16:27
pressure check at 12710' bit depth,
sensor depth 6,172 TVD, 3,723 psi
AP, 11.7 ppg, and dropping. Continue
IH lhru window
9/18/2017
9/18/2017
1.25
PROD4
DRILL
TRIP
P
Continue IH, RIH 8 k
12,710.0
15,380.0
16:27
17:42
9/18/2017
9/16/2017
0.50
PROEM
DRILL
CIRC
P
Confirmed TD 15,380', circulate 12.0
15,380.0
15,380.0
17:42
18:12
ppg beaded liner pill into coil.
9/18/2017
9/18/2017
3.50
PROD4
DRILL
TRIP
P
POOH, laying in 12.0 ppg liner running
15,380.0
78.2
18:12
21:42
pill with beads up to 12070', painting
EOP flags at 10,900' (white) &
13,600' (yellow)
9/18/2017
9/182017
0.50
PROD4
DRILL
OWFF
P
Al surface, check well for flow, PJSM
78.2
78.2
21:42
22:12
for LD drilling BHA on a dead well
9/18/2017
9/18/2017
1.00
PROD4
DRILL
PULD
P
LD Drilling BHA# 36
78.2
0.0
22:12
23:12
Page 46161
Report Printed: 9/2712017
Operations Summary (with Timelog Depths)
3M-27
is
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
Start Tare
End Time
1Ta (hr)
Phase
Op Cale
AC[Mty CMB
Time PJA
Operation
(Fd(B)
EM Depth MKB)
9/18/2017
9/18/2017
0.50
PROD4
DRILL
PULD
P
Function test BOP stack
0.0
0.0
23:12
23:42
9/1812017
9/19/2017
0.30
COMPZ4
CASING
PULD
P
Prep rig floor for PU liner assembly
0.0
0.0
23:42
00:00
9/19/2017
9/19/2017
0.30
COMPZ4
CASING
CTOP
P
Continue preeping floor to run liner,
0.0
0.0
00:00
00:18
PJSm to run liner
9/19/2017
9/19/2017
2.10
COMPZ4
CASING
PUTB
P
M/U lower AL2 -01 liner segment with
0.0
1,673.8
00:18
02:24
non ported bullnose, 2 pups, 2 tracers
# T912 Blue and T740 Freen. 39 Jts
slotted liner and shorty deployment
sleeve.
9/19/2017
9/19/2017
1.70
COMPZ4
CASING
PULD
P
PJSM, PIU coil trek with GS Spear,
1,673.8
1,718.0
02:24
04:06
M/U to liner. Set in slips, Skid injector.
Swap out checks in UQC. Check pack
offs, Make up to coil and surface test
9/19/2017
9/19/2017
1.40
COMPZ4
CASING
TRIP
P
RIH BHA# 37, AL2 -01 lower liner-.
1,718.0
12,619.0
04:06
05:30
segment
9/19/2017
9/19/2017
0.10
COMPZ4
CASING
DLOG
P
Correct to 10,600' EOP flag for+4'
12,614.0
12,618.0
05:30
05:36
correction, PUW=32K, DHWOB=BK
9/19/2017
9/19/2017
5.70
COMPZ4
CASING
TRIP
P
Continue in well, Clean trip through
12,618.0
15,380.0
05:36
11:18
window and past billets. Initial
setdown @ 13475. Work pipe to gel
-5-15 feet per cycle. Clean pick ups
@ 34-40K. Got clear @ 14,700' to TD
@ 15380
9/19/2017
9/19/2017
0.30
COMPZ4
CASING
TRIP
P
Liner on bottom, PUW=55K, Bring
15,380.0
13,706.2
11:18
11:36
pumps online @ 1.5BPM, PUW=30K.
Liner released. PUH and remove liner
length left in hole from counters,
1673.82'
9/19/2017
9/19/2017
0.40
COMPZ4
CASING
TRIP
P
Trip out of hole, Paint 12,700' EOP
13,706.2
12,580.0
11:36
12:00
flag - Uncorrected
9/19/2017
9/19/2017
0.10
COMPZ4
CASING
DLOG
P
Log K1 for+4' correction
12,580.0
12,614.0
12:00
12:06
9/19/2017
9/1912017
2.10
COMPZ4
CASING
TRIP
P
Continue trip out of well, Paint EOP
12,614.0
68.5
12:06
14:12
flag @ 11,700'
9/19/2017
9/19/2017
0.60
COMPZ4
CASING
PULD
P
At surface, Flow check, PJSM. Lay
68.5
0.0
14:12
14:48
down liner running tools
9/19/2017
9/19/2017
0.50
COMPZ4
CASING
PULD
P
R/U floor to run liner, PJSM Run AL2-
0.0
0.0
14:48
15:18
1
1
01 upper liner segment
9/19/2017
9/19/2017
2.10
COMPZ4
CASING
PUTS
P
M/U 12-01 upper liner segmet with
0.0
849.5
15:18
17:24
ported bull nose, 21 Jts slotted liner,
and shorty deployment sleeve,
Perform BOP kick while running liner
drill, slide in cart, check packoffs,
9/19/2017
9/19/2017
2.70
COMPZ4
CASING
RUNL
P
RIH with 1-2-01 Run #2, tie into
849.5
0.0
17:24
20:06
window flag for a +8.9 correction, tie
into K1 for 0' correction, continue RIH
to set depth (tagged at 13,707'), PUW
= 38K, RBIH, bring up pumps to 1.4
bpm, PUW = 30K, sheared off liner
9/19/2017
9/19/2017
2.50
COMPZ4
CASING
TRIP
P
Trip to surface, flow check well, PJSM
13,707.0
45.0
20:06
22:36
9/1912017
9/19/2017
0.90
COMPZ4
CASING
PULD
P
LD BHA #38, observe flat spot - 3' up
45.0
0.0
22:36
23:30
from EDP, within spec (.124"
measured for .175" pipe)
9/19/2017
9/20/2017
0.50
COMPZ4
CASING
PULD
P
PU BHA#39 (ported bull -nose, 3 pup
0.0
50.0
23:30
00:00
jnts, OH anchor & aluminum billet)
Page 47151
Report Printed: 9127/2017
Operations Summary (with Timelog Depths)
3M-27
...
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
End Time
our (hr)
Phase
Op code
Activity Code
Time P-T-X
Operation
W13)
End Depth (MR)
9/20/2017
9/20/2017
0.50
COMPZ4
CASING
PULD
P
Continue PU BHA #39 (ported bull-
50.0
100.0
00:00
00:30
nose, 3 pup jnts, OH anchor &
aluminum billet), slide in cart, stab on,
open EDC, tag up, set counters
9/20/2017
9/20/2017
3.60
COMPZ4
CASING
RUNL
P
RIH with BHA #39, tie in for+3'
100.0
12,857.0
00:30
04:06
correction, weight check = 32K, close
EDC, continue RIH to set depth, PUW
= 33K, RBIH to set depth (12,856.6'),
orient anchor 10° ROHS, bring up
pumps, release off anchor, set down
weight 4.51K WOB, good set
9/20/2017
9/2012017
2.10
COMPZ4
CASING
TRIP
P
POOH
12,857.0
73.0
04:06
06:12
Note: Spill Drill (Pits)
9/20/2017
9/20/2017
1.20
COMPZ4
CASING
PULD
P
PJSM, Flow check well, lay down BHA
73.0
- 0.0
06:12
07:24
# 39, Anchor billet running tools
9/20/2017
9/20/2017
0.70
PROD5
STK
PULD
P
PJSM, M1U BHA #40 to kick off liner
0.0
72.2
07:24
08:06
top billet with 1.7° motor RR HYC bi
center, M/U to tail and surface test.
Change packoffs, swap out UQC
checks
9/20/2017
9/20/2017
2.30
PRODS
STK
TRIP
P
RIH BHA #40
72.2
12,595.0
08:06
10:24
9/20/2017
9/20/2017
0.10
FROM
STK
DLOG
P
Log K1 for+7' correction
12,595.0
12,629.0
10:24
10:30
9/20/2017
9/2012017
0.10
PROD5
STK
TRIP
P
RIH
12,629.0
12,700.0
10:30
10:36
9/20/2017
9/20/2017
1.70
PROD5
STK
TRIP
P
Park and displace well back to 8.8
12,700.0
12,700.0
10:36
12:18
PPG PwrPro
9/20/2017
9/20/2017
0.10
PROD5
STK
TRIP
P
Close EDC, PUW=33K, Trip in, clean
12,700.0
12,745.0
12:18
12:24
pass through window
9/20/2017
920/2017
0.10
PROD5
STK
DLOG
P
Log RA for-2.5' correction
12,745.0
12,749.0
12:24
12:30
9/20/2017
9/20/2017
0.20
PROM
STK
TRIP
P
Continue in hole, Dry tag billet @
12,749.0
12,818.0
12:30
12:42
12818, PUH
920/2017
9/20/2017
0.90
PRODS
STK
KOST
P
Bring pups on line, 1.69 BPM @ 4320
12,818.0
12,818.5
12:42
13:36
PSI FS, BHP=3945, RIW=13.l K, start
milling @ 12817, made 12818.5 then
had multiple stalls, reduce pump rate
to 1.4BPM and work through
9/202017
9/20/2017
5.00
PROD5
STK
KOST
P
Go to 2 FPH, continue to stall, working
12,818.5
12,819.0
13:36
18:36
multiple TF's, decision made to POOH
& PU agitator
9/20/2017
9/20/2017
2.40
PROD5
STK
TRIP
P
POOH for agitator, park above
12,819.0
72.0
18:36
21:00
window, open EDC, swap from choke
A to choke B, choke fully open though
still holding -1000 psi pumping
minimum rate, trouble shoot, tag up
9/2012017
9/20/2017
2.20
PROD5
STK
PULD
P
Continue to trouble-shoot choke issue.
72.0
0.0
21:00
23:12
Decison made to PUD, then continue
to trouble shoot issue once on MP,
checks not holding, continue PUD,
open & cleaned choke A & B
(significant large, rounded, shale
-
pieces & aluminum in both chokes)
9/20/2017
9/2112017
0.80
PRODS
STK
PULD
P
Reconfigure BHA, PJSM, PD BHA#
0.0
50.0
23:12
00:00
1
I
I
41 (New B8 XD Edge bit,
motor, 69 hr agitator),
Page 48161 Report Printed: 912712017
Operations Summary (with Timelog Depths)
3M-27
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Tioie Log
sw oapth
Start Time
End Time
Our thin
Phase
op Cede
Activity Cada
Time PJA
operabon
(nka)
End Dept (flKB)
9121/201.7
9/21/2017
1.60
PRODS
STK
PULD
P
Continue PD BHA #41, pump across
50.0
78.0
00:00
01:36
the top, choke A & B operating as
expected, change out checks, slide in
cart, stab on, tag up, EDC closed
9/21/2017
9/2112017
2.50
PRODS
STK
TRIP
P
RIH with BHA #41, surface test
78.0
12,595.0
01:36
04:06
agitator, good, observe eratic choke
swings though appears to clear up;
possible cuttings from down -hole,
nothing unusual observed over
shakers
9/21/2017
9/21/2017
0.20
PRODS
STK
DLOG
P
Log K1 for+2.5' correction
12,595.0
12,632.0
04:06
04:18
9/21/2017
9/21/2017
0.30
PRODS
STK
RGRP
T
Park at 12,632' (install new seats mud
12,632.0
12,632.0
04:18
04:36
pump #2), PUW = 32K
9/21/2017
9/21/2017
0.30
PRODS
STK
TRIP
P
Continue RIH, stack -9K WOB at
12,632.0
12,820.0
04:36
04:54
window, PU, drop rate, RBIH without
issue, log RA tag for 0' correction
9/21/2017
9/21/2017
0.20
PRODS
STK
KOST
P
Dry tag 12,820.5', RBIH to continue
12,819.4
12,819.4
04:54
05:06
milling, pumping 1.7 bpm, FS = 1323
psi, circ pressure = 5321 psi, CWT
=11 K, WOB = .22K, Start milling @
12819.4
9/21/2017
9/21/2017
1.00
PRODS
STK
KOST
P
Milling off billet, 1.69 BPM @ 5011
12,819.4
12,821.0
0506
06:06
PSI FS, BHP=3935, 1 FPH,
9/21/2017
9/2112017
0.50
PRODS
DRILL
DRLG
P
Go to 10-15 FPH, 1.7 BPM @ 5011
12,821.0
12,828.0
06:06
06:36
PSI FS, BHP=3990
9121/2017
9/21/2017
0.70
PRODS
DRILL
DRLG
P
12,828', Drill ahead, 1.7 BPM @ 5011
12,828.0
12,870.0
06:36
07:18
PSI FS, BHP=3935, RIW=10K,
DHWOB=1.9K
9/21/2017
9/21/2017
0.10
PRODS
DRILL
WPRT
P
12870, PUH to drift billet area,
12,870.0
12,870.0
07:18
07:24
PUW=33K, Stack on billet @ 20L,
clean @ 30L, RBIH to drill
9/21/2017
9/21/2017
1.40
PRODS
DRILL
WAIT
T
Pull off bottom - exploring different
12,870.0
12,870.0
07:24
08:48
well plan options - Ream billet area,
Dry drift clean
9/21/2017
9/21/2017
2.50
PRODS
DRILL
DRLG
P
Drill ahead working WP4, 1.79 BPM
12,870.0
13,230.0
08:48
11:18
@ 5430 PSI FS, BHP=3960
9/21/2017
9/21/2017
2.90
PRODS
DRILL
TRIP
P -
Call end of build, Pump sweeps, Trip
13,230.0
78.0
11:18
14:12
out for lateral BHA, PUW=31 K
9/21/2017
9/21/2017
1.40
PRODS
DRILL
PULD
P
At surface, PJSM, PUD BHA #41
78.0
0.0
14:12
15:36
9/21/2017
9/21/2017
1.90
PRODS
DRILL
PULD
P
PIU New bit, C1 with 3D cutters, .5°
0.0
78.0
15:36
17:30
motor, and agitator. PD BHA #42 AU
lateral drilling BHA. Make up to coil
'
and surface test. Check packoffs
9/21/2017
9/21/2017
2.50
PRODS
DRILL
TRIP
P
RIH, surface test agitator, good, stack
78.0
12,595.0
17:30
20:00
weight on GLM at 3,533'. PU, reorient
TF, continue in-hole
9/21/2017
9/21/2017
0.20
PRODS
DRILL
DLOG
P
Log KI for+4.5' correction
12,595.0
12,635.0
20:00
20:12
9/21/2017
9/21/2017
0.40
PRODS
DRILL
TRIP
P
Continue RIH
12,635.0
13,230.0
20:12
20:36
9/21/2017
9/21/2017
2.80
PRODS
DRILL
DRLG
P
OBD, FS= 1130 psi, CWT =8K, WOB
13,230.0
13,630.0
20:36
23:24
= 1.5K, rate in = 1.75 bpm, BHP =
3987 psi, pump sweeps, average ROP
over interval = -143 fph
9/21/2017
9/21/2017
0.30
PRODS
DRILL
WPRT
P
WT up -hole, PUW = 32K
13,630.0
12,879.0
23:24
23:42
Page 49/51 Report Printed: 9/27/2017
Dvil Operations Summary (with Timelog L)epths)
3M-27
CtxtocoPlhilli
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Tifie Log
start Depth
T une
End T me
our (hr)
Phase
op Code
Atlivity code
Tme P-T-X
Operetlon
(111(8)
End Depth (KKB)
9/2112017
9/22/2017
0.30
PRODS
DRILL
WPRT
P
WT in-hole, RIW=6K
12,879.0
13,630.0
23:42
00:00
9/22/2017
9/22/2017
3.80
PRODS
DRILL
DRLG
P
BOBO, FS = 1190 psi, pumping 1.78
13,630.0
14,051.0
00:00
03:48
bpm, CWT = 4.5K, WOB = 1.5K, BHP
= 3964 psi, circ pressure = 5399 psi.
Begin swapping to mud System #7 at
13,760', new mud at the bit at 13,816',
pump sweeps, ROP over interval =
111 fph
9/22/2017
9/22/2017
0.50
PRODS
DRILL
WPRT
P
Wiper up-hole, PUW=35K
14,051.0
13,050.0
03:48
04:18
9/2212017
9/22/2017
o.40
PRODS
DRILL
WPRT
P
Wiper in-hole, RIW = 8K
13,050.0
14,051.0
04:18
04:42
9/22/2017
9/22/2017
1.20
PRODS
DRILL
DRLG
P
BOBD, FS = 1120 psi, pumping 1.8
14,051.0
14,182.0
04:42
05:54
bpm, CWT = 4.7K, WOB = 1.3K, BHP
= 3952 psi
92212017
9/22/2017
0.10
PRODS
DRILL
WPRT
P
14182', BHA Wiper, PUW=37K
14,162.0
14,182.0
05:54
06:00
9/22/2017
9/22/2017
0.90
PRODS
DRILL
DRLG
P
141821, Drill, 1.79 BPM @ 5105 PSI
14,182.0
14,275.0
06:00
06:54
FS, BHP=4010, RIW=2.2K,
DHWOB=I.9K
9/22/2017
9/22/2017
0.10
PRODS
DRILL
WPRT
P
14275', BHA wiper, PUW=37K
14,275.0
14,275.0
06:54
07:00
9/222017
9/22/2017
1.40
PRODS
DRILL
DRLG
P
14275', Drill, 1.79 BPM @ 5105 PSI
14,275.0
14,425.0
07:00
08:24
FS, BHP=4015
9/22/2017
9/22/2017
3.40
PRODS
DRILL
WPRT
P
14425 call TO, Chase 10 X 10 BBL
14,425.0
78.0
08:24
11:48
sweeps to swab valve, PUW=35K
9/222017
9/22/2017
PRODS
DRILL
WPRT
P
Tag up at surface, reset counters, Trip
78.0
12,595.0
11:48
11:48
in hole
9/22/2017
9/222017
2.20
PRODS
DRILL
DLOG
P
Log K1 for +1.5' correction, PUW=35K
12,595.0
12,627.0
11:48
14:00
9/22/2017
91222017
1.50
PRODS
DRILL
WPRT
P
Continue in hole, clear pass through
12,627.0
14,427.0
14:00
15:30
window, set down @ 12618 at 20 left,
went to 30L clean past
9/22/2017
9/22/2017
3.50
PRODS
DRILL
CIRC
P
Tag 14427' corrected, Trip out
14,427.0
78.0
15:30
19:00
pumping 12 PPG beaded liner pill
followed by 12 PPG completion fluid.
Paint EOP flags @ 12400,10400'
9/22/2017
9/2212017
1.50
PRODS
DRILL
PULD
P
Flow check well, good, PJSM, LD
78.0
0.0
19:00
20:30
BHA #42 (Cl bit came out a 2-1)
9/222017
9/22/2017
2.90
COMPZ5
CASING
PUTB
P
PJSM, PU AL3 liner (non-ported bull-
0.0
1,871.0
20:30
23:24
nose, 47 jnts slotted liner, & shorty
deployment sleeve), BOP Drill
"Running Liner'
9/22/2017
9/23/2017
0.60
COMPZS
CASING
PULD
P
PJSM, PU BHA#34, AL3 Liner
1,871.0
1,915.0
23:24
00:00
Running Tools
9123/2017
9/23/2017
0.70
COMM
CASING
PULD
P
Continue PU BHA #43, replace
1,915.0
1,915.0
00:00
00:42
checks, move in cart, MU to coil
9/2312017
9/23/2017
3.00
COMM
CASING
RUNL
P
RIH with BHA #43, tie into window flag
1,915.0
14,427.0
00:42
03:42
for+8.5' correction, weight check at
window = 31 K
Set downs at 13,920', 14,157', -
14,267',14,3a4', &14,397'
Tied into TO flag for 0' correction,
arrive at setting depth, weight check =
40K, bring up pumps, release off liner,
TOL=12,556'
Page 50151 Report Printed: 912712017
Operations Summary (with Timelog Liepths)
3M-27
Rig:
NABORS CDR3-AC
Job: DRILLING SIDETRACK
Time Log
Start Depth
Shan Time
End Time
Die fr)
Phase
Die Code
Afitr cede
Time P -T -X
Operation
(MG)
End Depth(ftKB)
9/23/2017
9/23/2017
0.40
COMPZ5
CASING
DLOG
P
Obtain SBHP, tool MD = 12,546', tool
14,427.0
12,541.0
03:42
04:06
TVD = 6,072', annular reached 3774
psi after 20 minutes, 11.95 ppg
equivalent.
9/23/2017
9/23/2017
3.80
COMPZ5
CASING
TRIP
P
Begin pumping seawater down coil,
12,541.0
12,541.0
04:06
07:54
displace well to seawater, diesel
freeze protect from 2500'
9/23/2017
9/23/2017
1.40
COMM
CASING
PULD
P
Al surface, PJSM PUD BHA #43,
12,541.0
53.0
07:54
09:18
Liner running tools, lay down tools and
pull checks from UQC
9/23/2017
9/23/2017
0.70
DEMOB
WHDBOP
RURD
P
Stab back on. Flush rig and jet stack,
0.0
0.0
09:18
10:00
unstab from well
9/23/2017
9/23/2017
1.50
DEMOB
WHDBOP
MPSP
P
PJSM, R/U BPV lubricator, set BPV,
0.0
- 0.0
10:00
11:30
test plug. RID BPV lubricator and load
out
9/23/2017
9/23/2017
4.50
DEMOB
WHDBOP
WIND
P
Start working RDMO check list, empty
0.0
0.0
11:30
16:00
pits, Nipple down stack, Check tree
bolts
Page 61161
Report Printed: 9127/2017
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 3M Pad
3M-27AL3
50.029-22637-63
Baker Hughes INTEQ
Definitive Survey Report
O6 October. 2017
BA ER
F�UGHES
E company
ConocoPhillips
ConocoPhillips
Definitive Survey Report
•
Company: ConocoPOilips(Aleske) Inc.-Kup2
Local Co-ordinate Reference: Well 31,11-27
Prop": Kuparuk River Und
ND Reference. 3M-27®6800usb(3M-27)
Sfta: Kupamk 3M Pad
MO Reference: 3M-27 III 68.00use(3M-27)
Well, 3M-27
North Reference: True
Wetmore: 3M-27
Survey Calculation Method: Minimum Curvmure
Design: 3M-27
Database. EDTAIaska Sandici
Proem Ki,xi River Unit. Norm Slope Alaska, United &ekes
Map System: US State Plane 1927(Exact solution)
System Datum: Mean Sea Level
Old Datum: NAD 1927 (NADCON CONUS)
Using Well Reference Port
Map Zone: Alaska Zona 04
Using geodetic scale factor
Well 3M.27
Well Position +W4 0.00 uaft
Northing: 6,016,6NE124usfl
LOtltude:
70°27'23,7WIN
+El-W 0.00 usit
Easting: 506,294.30 uaft
Longitude:
149" 56' 55.073 W
Poamon UncertaiMY 0.00 end
Wellhead Elevation: unit
Ground Level:
0 00 usfl
Wellbore 3M-27AL3
Margaret. Model Name Sample Dale
Declinations Dn
An9N
FWd3t.n th
(°)
11I
(nT)
WGM2016 7/1/2019
17.53
8100
57,543
Design 3111
Audit Notes:
version: 10 Phase: ACTUAL
Tie On Depth: 12,811.56
Vertical Section: Depth From(TVD)
+W4 +eUW
Direction
(ugh)
(uaN) loan)
r)
6500
000 000
200.00
Survey Program Deb 9/25/2017
From TO
Survey
Survey
lush) (ugh) Survey(WNlbota)
Tool Nene Description
BMR Data
End Date
26500 12,692.45 3M-27 (3M-27)
MWD MWO-Standard
1/15/2001
12,712,50 12,746.03 3M.27A MWD,1NC(3M-27A)
MWD-INC ONLY MW41NC_ONLY FILLER
811011017
&18121117
12,778.47 12.8115% 3M-27A MWD(3M-27A)
MWD MWD-Standard
&1812017
M6=17
12.817.00 14,375.37 3M-27A-3 MWD(3M-27AL3)
MWD MWD Standard
9119/2017
982/2017
10, 0174:28:54PM
PaW2
COMPASS 5000.14 Bak B5
11"
ConocoPhillips
Coni
Definitive Survey Report
Domesday: ConowlPbillips(AIesW) Inc.-Kup2
Local Co-oninate Retennce:
We113M-27
Postism Kupamk Riwr Unit
TVD Reference
3M.61®66.00use(3M@7)
3b: Kupamk 398 Pad
MD Reticence:
3M-27 ® 60.00us6 (3M-27)
MO: 3M-27
Nonb Reference:
Tone
Wellbore: 3M-27
Survey Calculation Merced
Mlnimun CurvaW.
Design: 3M 27
Database:
EDTMaska Sandbox
Annotation
TIP
KOP
fOW017 4.28:54PM Papa 3 COMPASS 5000.14 SW3d 85
Map
Map
vertical
MD
Me
Ari
TVD
TVDSS
40043
.0-W
Nanning
Eastin9
DIS
Section Survey Tool Name
(usR)
(')
P)
(MSR)
(oft)
(age)
(oft)
(M
(721f-1108.)
m)
12,81158
M43
27396
8,250.80
5,180.ed
235828
.,.a
6019,15585
49632&10
56.10
1,00424 MNDI3)
12,611.
8618
275.94
6.25900
6.19100
2558.78
b.97044
0.019.156.32
496322.69
sit
1005.85 MM (4)
12845.58
9256
27051
6,25924
8,191.24
2.66aW
-0.998.85
8,019,16790
496,204.19
30.11
1,01309 MM (4)
1287557
9470
202.77
625726
ole9.R
2,558.81
-10p28.80
8,018,158.12
496264.34
W47
1,Me 74 MYA (4)
1290573
8888
258.52
8.256.53
6188.53
2.553.20
-10,058.43
8,019,150.88
496.234.72
3022
1.04097 MWD (4)
12,036.1
8129
24881
8,256.70
8,10870
2.&4.32
-10,086.93
6,019.141.79
496,208.23
27.88
1,059.05 MWD (4)
12.96581
90A9
24167
8,25623
6,188.23
2,531]9
-10,11417
6.01snM24
496,17901
2428
1,MO 14 MWD (4)
12,99675
.05
23331
am 85
6187.85
2,51561
-10,139.50
5,019.11303
496,15363
27.78
1.104.03 MWD (4)
13.02893
9133
225.44
8.25528
6,18726
2.495.33
-1016320
6.019,092.73
498.130.01
25.25
1,131.18 MJA (4)
13,05605
Not
216.
6254.79
CIN 70
20373
-1018271
6.019,071,12
498.11053
23.10
1.158.14 MM(4)
13.m 02
W37
21054
6.254.53
6.188.63
2,449.10
-10.19973
6,019,04848
488.09353
2737
118711 MWD(4)
13,115.57
9183
20233
8,254.02
8.189.02
2,422.87
-10,21207
6,019,02003
498,080.41
28.10
1.216.45 MM (4)
13,148.33
90.71
19296
6.25339
8.105.39
2393.39
-IsMA8
8,018,88078
496,071.12
33Eo
1,247.14 MWD(4)
13.175.0
9320
1!8.00
6,252.37
6,184.37
2364.67
-10.22700
outs90203
allows 33
25.18
1.27577 MM (4)
13,205.52
90.56
176,80
6,25128
8.18328
2334.71
-10.91775
6.018,932,07
406.085.81
310
1,304.19 MWD(4)
13,233.02
"52
17025
6.25141
6.18344
230442
-10.M4,31
8.018,901 ]9
498,069.07
mw
1.331.47 MM (4)
13,268.37
08.95
17375
6.252.16
8.184.16
2.27240
-10.219.81
8,018,889.77
490073.58
1080
1,350.03 MWD(4)
13,29703
8813
178.07
6,25281
8.184.81
224356
10,21727
6.018.841.24
495.07618
038
1,38597 MWD(4)
13,328.02
8779
179.19
8353.77
8.18577
2.214.91
-10.216.07
6ot8,812.30
45607738
10.88
1,41276 MWD (4)
13.355.65
86.0
18228
8,2MM
8,18726
218533
-10,21845
6.018,782.72
495,071,03
11.38
1,44089 MWD (4)
13386.38
0607
18603
0,25700
olsoc0
2.165 II
-10,21&80
6.018.753 11
496.07490
12.67
1.46935 111 (4)
1341577
8890
186.29
8,258.12
8.190.12
2,125.54
-10,221.86
6,018.M283
49807167
874
149873 MND (4)
13.446.14
88.54
18256
8.258.54
8.18054
2,005.27
-10,224M
6,01B.'som
496,34835
12.48
1.527.97 MND (4)
1347549
90.15
18108
6.25882
510082
2,085.93
-10,22513
0tigmas
498.058.45
5.45
1.55556 MM(4)
13.50.42
0015
17949
0.25.
6,1M)54
2.03601
-$22520
6.019.03.10
assess 32
5.31
1,68403 MNO (4)
13,53555
9129
17895
8.250.16
6,190.16
205.90
-10.224.35
6,018,60300
408,0892.
824
1,81201 MND (4)
13.58557
9345
175.31
8,258.92
818892
1,87597
-78,222.32
8,.18,73.38
498,07133
903
1.839.43 MWD(4)
13506.38
93.72
17156
6.25499
6.156.99
1,94543
-10.218.81
6,018,54284
498,07487
12.10
1%593 MND(4)
13.627.38
94.37
170.50
6,25280
6.184.00
1,81489
-10,21309
B,o10,51231
493,07972
400
1693.96 MM (4)
1865530
0335
17364
8250W
6182.92
188722
-10.210.13
8.018.484.65
498,083.80
11.77
1718W MM (4)
Annotation
TIP
KOP
fOW017 4.28:54PM Papa 3 COMPASS 5000.14 SW3d 85
III
ConocoPhillips
•
COnOCOPQIlllps
Definitive Survey Report
Company
C...Phllilps(Alaskal Inc.-Kup2
Local Co dinate Reference:
Mil 3M-27
Project:
KuPemk River Und
TVD Reference:
3M-27@68.00usR(3M-27)
$an
Kupemk 3M Pad
MD Reference:
3M.27 ({Q 68,00usl1(3M@7)
Well:
3M-27
North Rd....:
True
Wellbore
3M-27
Survey Cumulation Method:
Minimum
Curvature
Design:
3M-27
Database:
EDT Alaska Sandbox
Survey
Map
Map
br5wl
MD
Inc
Alai
ND
NOBS
eW3
ell -W
NORhin9
Email"
DLS
acecn Suryd Nit
ey Tore
Annotation
(nen)
0
(')
(Iran)
(usR)
tusR)
(usft)
(n)
IRI
C/low)
IR)
13,60538
9415
17432
6,24895
8,180.
1,115767
-10.20701 6018.45500
486,088]5
3.51
1]4646 MND(4)
13,716.03
9375
177.29
8246.84
8.178.84
1.82856
-10.204.76 8,018,42439
49,08902
972
171345 MWO(4)
13.745.75
9089
17732
6245.
8,17764
1,70730
-,amm 6,018.38474
49080.44
9.62
1,800.85 MWO(4)
1377525
89.M
178.07
8.24559
8,117.59
1767.82
-10.20218 &018.38537
49,09165
580
182814 MM (4)
13.805.61
8865
18001
8,246.13
0,178.13
1,73747
-10,20187 6,018,3.492
49.08210
6.76
1656.46 MWD(4)
13,83533
8957
184.63
8,248.69
8,178%
1,70779
40.202.85 6,018.305.24
49.09103
1552
1804.78 MM (4)
13,88554
9092
18595
6346.46
5.17848
1,871.71
-10,2961 8,018,27516
4908830
6.49
1.91399 MM (4)
13,88563
91.10
1.41
8245.
6,1779
i'mW
-10,208.61 6.018.245 44
495.084.32
1165
194328 MM (4)
i
13,92497
91II
192.09
6.24520
6.17720
181908
-10,21510 6,0182160
496,078.9
9.34
1.47233 AM (4)
13,85561
971
1942
8.241.56
8,176.56
1.589.40
-10.m. 8,018,1905
49807134
14.51
2,9280 MVA(4)
1388557
8773
19.08
6.2449
6.176.9
1,56081
-10$31.02 8.018,158.9
498.92.98
10.01
2.032% MM (4)
14,015.53
80.26
29.17
6.246.01
6.17801
1.0210
-10,24034 8,018,129.63
499370
1375
2,06261 MM (4)
I
14,04525
8874
20281
6.248.79
6,17870
1,501.55
-10,251.22 6.018.401.88
49.042.84
9.03
2,09231 MM (4)
14,077.88
88.9
205.95
6.247.45
6.17945
1,474.84
-10.26.9 8.0180M.26
49029.40
964
2,12463 MM (4)
i
14,10539
8828
20748
6247.88
8.17968
1.450.27
-10,277.9 6.01&01780
4..417 ,06
567
2.152.15 SIM (4)
14135.
8854
210.71
6,244.19
8j. 19
1,424.32
-10,281A9 8.016,021.73
49,002.84
10.92
2.18147 MVA) (4)
1416533
90.81
21445
6.248.14
6,180.14
1,398.85
-10,80777 8017,9924
495,99.38
1288
2,210. MNA(4)
1419530
9216
21765
631140
8.17040
137463
10,325.40 8,017,9M.01
485,06870
11.85
2,23877 MVA(4)
14225.38
93.28
21967
6.215.87
6.177.97
1,351.17
-10.344.17 6.017,948.53
495,950 03
764
2,28823 MWD (4)
1425513
9422
M223
6,243.84
8,17584
1,328.76
-1093.61 6,017,92511
485930.61
1020
SNOW MWD (4)
14,285.12
9341
22315
6.24169
8.173.9
1,3977
-10,38399 8,0174.4.11
495,91035
689
2,32353 M (4)
14,31507
0375
226 Be
"a
8.17138
128541
-10.404]9 6.017.882.73
495.88947
8.18
2,350.76 MAD(4)
14,345211
93.91
32&36
0.23777
8.169.77
1,254.90
-10,42897 8017,9220
405,867.51
920
2,377% MWD(4)
14,37637
9448
231.5
6,235.%
6,19.56
1.245.54
-10.44979 6,017.8,062
49,844.50
10.46
2.403.62 MWD (4)
14.427.
94.46
2315
6,23155
8,15 .55
1,21349
-104... 6,017.81075
498M.25
0.
2,44751 PRQ)ECTEDWTD
10.6[017 4:28'54PM
Page 4
COMPASS 5000.14 Budd 85
RECEIVED
OCT 16 2017
AOGCC
BA ER
UGHES
a GE company
To:
Letter of Transmittal
Date: NUE LoGED
October 16, M K 9ENUE2017 CD in 217-053 R
Makana Bender
AOGCC
333 West 711 Ave, Suite 100
Anchorage, Alaska 99501
From:
Yosha Ragbirsingh / Michael Soper
Baker Hughes, a GE Company
795 East 9411 Avenue
Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
3M -27A
3M-27AL1
3M-27AL2PB1
3M-27AL2
3M-27AL2-01
3M-27AL3
2A -22A
2A-22AL1
(8) Total prints
217-053 28680
217-054 28681
217-055 28682
217-055 28683
217-056 28684
217-057 28685
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Michael Soper, Baker Hughes, Project Engineer
Michael.Soper@BHGE.com
Yosha Ragbirsingh, Baker Hughes, Survey Manager
ConocoPhillips
RECEIVED
OCT 16 2017
AOGCC
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 3M Pad
3M-27AL3
F�iaiYbi��E�
Baker Hughes INTEQ
Definitive Survey Report
06 October, 2017
217-057 28685
BAT(ER
UGHES
a GE company
ConocoPhillips 6AES
(ER
ConocoPhilli p s Definitive Survey Report �G"
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kupamk River Unit
Site:
Kuparuk 3M Pad
Well:
3M-27
Wellbore:
3M-27
Design:
3M-27
Project
v Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution) System Datum
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Alaska Zone 04
Well 3M-27
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well Position
+N/ -S
0.00 usft
Northing:
Survey
+E/ -W
0.00 usft
Easting:
Position Uncertainty
Start Date
0.00 usft
Wellhead Elevation:
Wellbore
3M-27AL3
1/15/2001
12,746.03
Magnetics
Model Name
MWD-INC—ONLY—FILLER
Sample Date
Design
Audit Notes:
Version:
Vertical Section:
Survey Program
From
(usft)
265.00
12,712.50
12,778.47
12,817.00
BGGM2016
3M-27AL3
1.0
Phase: ACTUAL
Depth From (TVD)
(usk)
68.00
Date 9/25/2017
7/1/2017
Well 3M-27
3M-27 (03 68.00usft (3M-27)
310-27 @ 68.00usft (3M-27)
True
Minimum Curvature
EDT Alaska Sandbox
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
6,016,606.24usft
506,294.30usft
usft
Declination
(I
17 53
Tie On Depth: 12,811.56
*NIS
(usft)
0.00
+E/ -W
(usft)
0.00
Latitude:
Longitude:
Ground Level:
Dip Angle
(1)
81.00
70° 27'23.753 N
149° 56'55,073 W
0.00 usft
Field Strength
h1n
57,543
Direction
(1)
200.00
TO
Survey
(usft)
Survey (Wellbore)
Tool Name
Descrippon
Start Date
12,69245
3M-27 (310-27)
MWD
MWD -Standard
1/15/2001
12,746.03
3M -27A MWD-INC(3M-27A)
MWD-INC_ONLY
MWD-INC—ONLY—FILLER
8/18/2017
12,811.56
3M -27A MWD (3M -27A)
MWD
MWD- Standard
8/18/2017
14,375.37
3M-27AL3 MWD(3M-27AL3)
MWD
MWD -Standard
9/19/2017
a
Survey
End Data
9
8/18/2017
8/26/2017
v
9/22/2017 =
10/62017 4:28.54PM Page 2 COMPASS 5000.14 Build 85
ConocoPhillips 0
Definitive rt
ConocoPhillipsUNES
efinitive Survey Repo
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Local Co-ordinate Reference:
Well 3M-27
Project:
Kuparuk River Unit
TVD Reference:
3M-27 (a] 68.00usft (3M-27)
Site:
Kuparuk 3M Pad
MD Reference:
3M-27 @ 68.00usft (3M-27)
Well:
3M-27
North Reference:
True
Wellbore:
3M-27
Survey Calculation Method:
Minimum Curvature
Design:
3M-27
Database:
EDT Alaska Sandbox
Survey
I
I
Map
Map
Vertical
9 MD
Inc
Azi
TVD
NDSS
+N/ -S
+El -W
Northing
Easting
DLS
Section
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°/100')
Survey Tool Name
Annotation
(ft)
(ft)
(ft)
1
12,81156
85.43
273.96
6,258.60
6,190.60
2,558.29
-9,965.04
6,019,155.85
496,328.10
56.16
1,004.24
MWD (3)
TIP i
12,817,00
86.18
275.94
6,259.00
6,191.00
2,558.76
-9,970.4
6,019,155.32
496,322.69
38.83
1,005.65
MWD (4)
KOP
12,845.58
92.86
27051
6,25924
6,191.24
2,560.36
'9,998.95
6,019,15790
496,29419
30.11
1,013.89
MWD(4)
12,875.57
94.70
262.77
6,257.26
6,189.26
2,558.61
-10,028.80
6,019,15012
496,264.34
26.47
1,025.74
MWD (4)
12,905.73
88:06
256.52
6,256.53
6,188.53
2,553.20
-10,058.43
6,019,150.68
496,234.72
3022
1,040.97
MWD (4)
12,93561
91.29
248.91
6,256.70
6,188.70
2,544.32
-10,086.93
6,019,14179
496,206.23
2766
1,059.05
MWD (4)
12,965.61
90.49
24167
6,256.23
6.88.23
2,531.79
-10,114.17
6,019,129.24
496,179,01
2428
1,080.14
MWD (4)
�
12,995.75
90.95
233.31
6,255.85
6,187.85
2,51561
-10,139.55
6,019,11303
496,153.63
27.78
1,104.03
MWD (4)
13,026.93
9123
225.4
6,255.26
6,187.26
2495.33
-10,163.20
6,019,092.73
496,130.01
25.25
1,131.18
MWD (4)
13,056.05
9061
218.74
6,254.79
6,186.79
2,47373
-10,182.71
8,019,071.12
496,110.53
23.10
1,158.14
MN1D(4)
1(((
13,086.02
90.37
210.54
6,254.53
6,18653
2,449.10
-10,199.73
6,019,046.48
496,093.53
27.37
1,187.11
MWD (4)
p
13,115.57
91.63
202.33
6,254.02
6,168.02
2,422.67
-10,212.87
6,019,020.03
496,08041
28.10
1,216.45
MWD (4)
73
13,146.33
90.71
192.%
6,253.39
6,185.39
2,393.39
-10,222.18
6,018,99076
496,071.12
30.60
1,247.14
MWD (4)
4
13,175.49
93.29
186.08
6,252.37
6,184.37
2,35467
-10,227.00
6,018,962.03
496,06633
25.18
1,275,77
MWD (4)
13,205.52
90.86
176.80
6,251.28
6,183.28
2,334.71
-10,227.75
6,018,932.07
496,06561
31.92
1,304.19
1(4)
13,2 c2
88.52
170.25
6,251.44
6,183.44
2,304.42
-10,224.31
6,018,90179
496,069.07
22.80
1,331.47
MM (4)
13,268.37
88.95
173.75
6,252.16
6,184.16
2,27240
-10,219,81
6,018,869.77
496,073.59
10.90
1,360.03
MWD (4)
13,297.03
88.43
176.07
6,252.81
6,184.81
2,243.86
-10,217.27
6,018,841.24
496,076.16
8.29
1,385.97
MWD (4)
13,326.02
87.79
179.19
6,253.77
6,185.77
2,214.91
-10,216.07
6,018,81230
496,077.38
10.98
1,412.76
MWD (4)
E
13,35565
86.43
182.28
6.255.26
6,187.26
2,185.33
-10,216.45
6,018,782.72
4960]].03
11.38
1,440.69
MWD (4)
13,385.39
86.87
186.03
6,257.00
6,189.00
2,155.72
-10,218.60
6,018,753.11
496,074.90
12.67
1,469.25
MWD (4)
i
13,41577
88.90
186.29
6,258.12
6,190.12
2,125.54
-10,221.86
6,018,722.93
496071.67
6.74
1,498.73
MWD (4)
13,446.14
89.54
182.56
6,258.54
6,190.54
2,095.27
-10,224.20
6,018,692.66
496069.35
12.46
1,527.97
MWD (4)
i
13,475.49
90.15
181.08
6,258.62
6,193.62
2,065.93
-10,225.13
6018,663.33
496,068.45
5.45
1,555.86
MWD (4)
13,505.42
90.15
179.49
6,258.54
6,190.54
2,036.01
-10,225.28
6,018,633.40
496,068.32
5.31
1,584.03
MWD (4)
( 13,535.55
91.29
176.95
6,258.16
6,190.16
2,005.90
-10,224.35
6,018.603.30
496,069.28
9.24
1,612.01
MWD (4)
13,565.57
93.45
175.31
6,255.92
6,188.92
1,975.97
-10,222.32
6,018,57338
496,071.33
9.03
1,639.43
MWD (4)
13,596.38
93.72
171.56
6,254.99
6,186.99
1,94543
-10,218.81
6,018,542.84
496074.87
12.18
1,666,93
MWD (4)
I
13,627.38
94.37
170.50
6,252.80
6,184.80
1,914.89
-10,213.99
6,018,512.31
496,079.72
4.00
1,693.98
MWD (4)
1 13,655.38
93.35
173.64
6,25092
6,162.92
1,887.22
-10,210.13
6,018,484.65
496,083.60
11.77
1,718.66
MWD (4)
10/872017 4:28:54PM Page 3 COMPASS 5000.14 Build 85
10/62017 4:28:54PM Page 4 COMPASS 5000.14 Build 85
ConocoPhillips
eA ER
ConocoPhillips
n
`•GHFS
Definitive
Survey Report
Company:
ConocoPhillips
(Alaska) Inc. -Kup2
Local Co-ordinate Reference:
Well 3M-27
,
Project:
Kuparuk River Unit
ND Reference:
3M-27 @ 68.00usft (3M-27)
Site:
Kupamk 3M Pad
MD Reference:
3M-27 @ 68.00usft (3M-27)
Well:
3M-27
North Reference:
True
Wellbore:
3M-27
Survey Calculation Method:
Minimum
Curvature
Design:
3M-27
Database:
EDT Alaska Sandbox
Survey
Map
Map
vertical
MD
Inc
AzI
ND
NDSS
+NI -S
+E/ -W
OILS
(usft)
(°)
(•)
(usft)
(usft)
(usft)
(usft)
Northing
Easting
(°(100')
Section
Survey Tool Name
Annotation
(ft)
(ft)
(ft)
13,685.26
94.15
174.32
6,248.96
6,180.96
1,857.57
-10,207.01
6,018,45500
496,08675
3.51
1,745.46
MWD (4)
13,716.03
93.75
177.29
6,246.84
6,178.84
1,826.96
-10,204.76
6,018,424.39
496,069.02
9.72
1,773.45
MWD (4)
13,745.75
90.89
177.32
6,245.64
6,177.64
1,797.30
-10,203.36
6,018,394.74
496,090.44
9.62
1,800.85
MWD (4)
13,775.25
89.32
178.07
6,245.59
6,177.59
1,767.82
-10,202.18
6,018,365.27
495,091.65
5.90
1,828.14
MWD (4)
13,805.61
88.65
180.01
6,246.13
6,178.13
1,737.47
-10,20167
6,018,334.92
496,092.19
6.76
1,856.48
MWD (4)
13,835.33
89.57
184.53
6,246.59
6,178.59
1,707.79
-10,202.85
6,018,305.24
496,091.03
15.52
1,884.78
MWD (4)
13,865.54
90.92
185.95
6,246.46
6,178.46
1,677.71
-10,20561
6,018,275.16
496,088.30
649
1,913.99
MWD (4)
13,895.53
91.10
189.41
6,245.93
6,177.93
1,648.00
-10,209.61
6,018,245.44
496,084.32
11.55
1,943.28
MWD (4)
13,924.97
91.72
192.09
6,245.20
6,177.20
1,619.08
-10,215.10
6,018,216.53
496,078.86
9.34
1,972.33
MWD (4)
13,95561
9071
196.42
6,244.55
6,176.55
1,589.40
-10,222.64
6,018,186.85
496,071.34
14.51
2,002.80
MWD (4)
13,985.57
87.73
196.08
6,244.96
6,176.96
1,560.64
-10,231.02
6,018,15808
496,062.98
10.01
2,032.69
MWD (4)
14,015.53
88.25
200.17
6,246.01
6,178.01
1,532.19
-10,240.34
6,018,129.63
496,053.70
13.75
2,062.61
MWD (4)
14,045.25
88.74
202.81
6,246.79
6,17879
1,504.55
-10,251.22
6,018,101.98
496,042.84
9.03
2,092.31
MWD(4)
14,077.88
88.96
205.95
6,247.45
6,179.45
1,474.84
-10,264.68
6,018,072.26
496,029.40
9.64
2,124.83
MWD (4)
14,105:39
89.26
207.48
6,247.88
6,179.88
1,450.27
-10,277.05
6,018,047.68
496,017.06
5.67
2,152.15
MWD(4)
14.135.09
89.54
21071
6,248.19
6,180.19
1,424.32
-10,291.49
6,018,021.73
496002.64
10.92
2,181.47
MWD (4)
14,165.33
9064
214.45
6,248.14
6,180.14
1,398.85
-10,307.77
6,017,996.24
495,986.38
12.89
2,210.98
MWD (4)
S
14,195.30
92.18
217.65
6,24740
6,179.40
1,374.63
-10,325.40
6,017,972.01
495,968.78
11.85
2,239.77
MWD (4)
14,225.38
93.28
219.67
6,245.97
6,177.97
1,351.17
-10,344.17
6,017,948.53
495,950.03
7.64
2,268.23
MM (4)
14,255.13
94.92
222.23
6,243.84
6,175.84
1,328.76
-10,363.61
6,017926.11
495,93061
1020
2,295.94
MWD (4)
14,285.12
93.41
223.15
6,241.66
6,173.66
1,306.77
-10,383.89
6,017,904.11
495,910.35
5.89
2,323.53
MWD (4)
14,315.07
93.75
225.58
6,239.79
6,17179
1,285.41
-10,404.79
6,017,882.73
495,889.47
8.18
2,350.76
MWD (4)
14,345.20
93.94
228.38
6,237.77
6,169.77
1,264.90
-10,426.77
6,017,862.20
495,867.51
929
2,377.55
MWD (4)
14,375.37
94.46
231.50
6,235.56
6,167.56
1,245.54
-10,449.79
6,017,842.82
495,844.50
10.46
2,403.62
MWD (4)
I
14,427.00
94.46
231.50
6,231.55
6,163.55
1,213.49
-10,490.08
6,017,810.75
495,804.25
0.00
2,447.51
PROJECTED to TD
10/62017 4:28:54PM Page 4 COMPASS 5000.14 Build 85
BAM,.0 HES 0PRINT DISTRIBUTION LIST
a GE company
COMPANY ConocoPhilli Is Alaska, Inc.
WELL NAME 3M-27AL3 RECEIVE
FIELD Greater Kuparuk Area OCT 13 2011
COUNTY North Slope Borough A EG)G C
BHI DISTRICT
Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick.Rider(cDbakerhughes.com
STATUS Final Replacement: No
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
t !BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ! ConocoPhillips Alaska Inc.
Attn: Tom Osterkamp
ATO 3-344
700 G Street
(Anchorage, AK 99510
3 Exxon Mobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC
Atm: Makana Bender
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division ofOil & Gas a*•
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
6 B Exploration (Alaska) Inc.
Petrotechnical Data Center, 1R2-1
900 E. Benson Blvd
Anchorage, Alaska 99508
11 7057
28660
Please sign and return one copy of this transmittal form to:
ConocoPhillips Alaska, Inc.
Tom Osterkamp (WNS Petroleum Technician
700 G Street. D TA LOGGED
O / 1,3/2071
Anchorage, Alaska 99510 M. K. BENDER
to acknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE September 22, 2017
TODAYS DATE October 11, 2017
Revision
Details:
Rev. Requested by: --
FIELD I
FINALCD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
1# OF COPIES
I# OF COPIES
10
0 1 0 1 0 1 0 10
0 1 0 1 0 1 0 10
TOTALS FOR THIS PAGE: 0 2 3 3 0
ConocoPhillips RECEI`l
OCT 13 2017
&,OGM
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 3M Pad
3M-27AL3
50-029-22637-63
Baker Hughes INTEQ
Definitive Survey Report
06 October. 2017
BAER
UGHES
a GE company
21 7057
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips(Alaska) Inc.-Kup2
Local Coordinate Reference:
Project: Kuparuk River Unit
TVD Reference:
Site: Kupamk 3M Pad
MD Reference:
Well: 3M-27
North Reference:
Wellbore: 3M-27
Survey Calculation Method:
Design: 3M-27
Database:
Project Kuparuk River Unit, North Slope Alaska, United States
Well 3M-27
3M-27 @ 68.00usft (310-27)
3M-27 @ 68.00usft (3M-27)
True
Minimum Curvature
EDT Alaska Sandbox
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS)
Audit Notes:
Using Well Reference Point
Map Zone:
Alaska Zone 04
1.0
Using geodetic scale factor
Well
3M-27
..
- .., _..._. _._, ....�
Well Position
+N/ -S 0.00 usft
Northing:
6,016,606.24usft
68,00
+E/ -W 0.00 usft
Easting:
506,294,30usft
Position Uncertainty
0.00 usft
Wellhead Elevation:
usft
Wellbore 3M-27AL3
Magnetics Model Name Sample Date
Declination
(1)
17.53
Tie On Depth: 12,811.56
+NiS +E/ -W
(usft) (usft)
0.00 0.00
Tool Name
BGGM2016
7/1/2017
Design
3M-27AL3
MWD-INC—ONLY—FILLER
Audit Notes:
MWD - Standard
MWD
Version:
1.0
Phase: ACTUAL
Vertical Section:
8/26/2017
Depth From (TVD)
9/22/2017
(usft)
68,00
Survey Program
Date 9/25/2017
From
To
(usft)
(usft)
Survey (Wellbore)
265.00
12,692.45
3M-27 (3M-27)
12,712.50
12,746.03
3M -27A MWD -INC (3M -27A)
12,778.47
12,811.56
3M -27A MWD(3M-27A)
12,817.00
14,375.37
3M-27AL3 MWD (3M-27AL3)
Declination
(1)
17.53
Tie On Depth: 12,811.56
+NiS +E/ -W
(usft) (usft)
0.00 0.00
Tool Name
Description
MWD
MWD - Standard
MWD-INC_ONLY
MWD-INC—ONLY—FILLER
MWD
MWD - Standard
MWD
MWD - Standard
Latitude:
Longitude:
Ground Level:
Dip Angle
(1)
81.00
70' 27'21753 N
149° 56'55.073 W
0.00 usft
Field Strength
(nT)
57, 543
Direction
('1
200.00
Survey
Survey
Start Date
End Dais
1/15/2001
8/18/2017
8/18/2017
8/18/2017
8/26/2017
9/19/2017
9/22/2017
1016@017 4: 26: 54PM Page 2 COMPASS 5000.14 Build 85
Survey
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips (Alaska) Inc. -Kup2
Local Coordinate Reference:
Well 3M-27
Project: Kuparuk River Unit
TVD Reference:
3M-27 @ 68.00usft (310-27)
Site: Kuparuk 3M Pad
MD Reference:
3M-27 @ 68.00usft (3M-27)
Well: 3M-27
North Reference:
True
Wellbore: 3M-27
Survey Calculation Method:
Minimum Curvature
Design: 3M-27
Database:
EDT Alaska Sandbox
Survey
10/672017 428r54PM
Page 3
SA (ER
�UGRLS
Annotation
TIP
KOP
COMPASS 5000.14 Build 85
Map
Map
Vertical
MD
Inc
At,
TVD
TVDSS
+N/ -S
+EI -W
Northing
Easting
DLS
Section
Survey Tool Name
(usk)
(°)
(°)
(usR)
lush)
(usft)
(usR)
(ft)
(R)
(°/100')
(ft)
12,811.56
85.43
273.96
6,258.60
6,190.60
2,558.29
-9,965.04
6,019,155.85
496,328.10
56.16
1,004.24
MWD (3)
12,817.00
86.18
275.94
6,259.00
6,191.00
2,558.76
-9,970.44
6,019,156.32
496,322.69
38.83
1,005.65
MWD (4)
12,845.58
92.66
270.51
6,259.24
6,191.24
2,560.36
-9,998.95
6,019.157.90
496,294.19
30.11
1013.89
MWD (4)
12,875.57
9470
262.77
6,257.26
6,189.26
2,558.61
-10,028.80
6,019,156.12
496,264.34
26.47
1,025.74
MWD (4)
12,905.73
88.06
256.52
6,256.53
6,188.53
2,553.20
-10,058.43
6,019,150.68
496.234.72
30.22
7040.97
MWD (4)
12,935.61
91.29
248.91
6,256.70
6.188.70
2,544.32
-10,086.93
6,019,141.79
496,206.23
27.66
1,059.05
MWD (4)
12,965.61
90.49
241.67
6,256.23
6,188.23
2,531.79
-10,114.17
6,019,129.24
496,179.01
24.28
1,080.14
MWD (4)
12,995.75
90.95
233.31
6,255.85
6,187.85
2,515.61
-10,139.56
6,019,113.03
496153.63
27.78
1,104.03
MWD (4)
13,026.93
91.23
225.44
6,255.26
6,187.26
2,495.33
-10,163.20
6,019,092.73
496,130.01
25.25
1,131.18
MWD (4)
13,056.05
90.61
218.74
6,254.79
6.186.79
2,473.73
-10,182.71
6,019,071.12
496,110.53
23.10
1,158.14
MWD (4)
13,086.02
90.37
210.54
6,254.53
6,183.53
2,449.10
-10,199.73
6,019,046.48
496,093.53
27.37
1,187.11
MWD(4)
13,115.57
91.63
202.33
6,254.02
6,183.02
2,422.67
-10,212.87
6,019,020.03
496.080.41
28.10
1,216.45
MWD(4)
13,146.33
90.71
192.96
6,253.39
6,185.39
2,393.39
-10,222.18
6,018,990.76
496,071.12
30.60
1,247.14
MWD (4)
13,175.49
93.29
186.08
6,252.37
6,184.37
2,364.67
-10,227.00
6,018,962.03
496,066.33
25.18
1,275.77
MWD (4)
13,205.52
90.86
176.80
6,251.28
6,183.28
2,334.71
-10,227.75
6018,932.07
496,065.61
31.92
1,304.19
MWD (4)
13,236.02
88.52
170.25
6,251.44
6,183.44
2.304.42
-10,224.31
6,018,901.79
496,069.07
22.80
1,331.47
MWD (4)
13,268.37
88.95
173.75
6252.16
6,186.16
2,272.40
-10,219.81
6,018.869.77
496,073.59
10.90
1,360.03
MWD (4)
13,297.03
88.43
176.07
6,252.81
6,184.81
2,243.86
-10,217.27
6,018,891.24
496.076.16
8.29
1,385.97
MW0 (4)
13,326.02
87.79
179.19
6,253.77
6,185.77
2,214.91
-10,216.07
6,018,812.30
496,077.38
10.98
1,412.76
MWD (4)
13,355.65
86.43
182.28
6,255.26
6,187.26
2,185.33
-10,216.45
6,018,782.72
496,077.03
11.38
1,440.69
MWD(4)
! 13,385.39
86.87
186.03
6,257.00
6,189.00
2,155.72
-10,218.60
6,018,753.11
496,074.90
12.67
1,469.25
MWD (4)
13,415.77
88.90
186.29
6,258.12
6,190.12
2,125.54
-10.221.83
6,018,722.93
496,071.67
6.74
1,498.73
MWD (4)
13.446.14
89.54
182.56
6,258.54
6.190.54
2,095.27
-10,224.20
6,018.692.66
496,069.35
12.46
1,527.97
MWD (4)
13,475.49
90.15
161.08
6,258.62
6,190.62
2,065.93
-10225.13
6,018,663.33
496,068.45
5.45
1,555.86
MAD (4)
13,505.42
90.15
179.49
6,258.54
6,190.54
2,036.01
-10,225.28
6,018,633.40
496,068.32
5.31
1,584.03
MWD (4)
I 13,535.55
91.29
176.95
6,258.16
6,190.16
2,005.90
-10,224.35
6.018,603.30
496069.28
9.24
1.612.01
MWD (4)
13,565.57
93.45
175.31
6,256.92
6,188.92
1,975.97
-10,222.32
6,018,573.38
496,071.33
9.03
7,639.43
MWD (4)
13,596.38
93.72
171.56
6,254.99
6,186.99
1,945.43
-10,218.81
6,018,542.84
496,074.87
12.18
1,666.93
MWD (4)
13,627.38
94.37
170.50
6,252.80
6,189.80
1914.89
-10,213.99
6,018,512.31
496,079.72
4.00
1,693.98
MND (4)
13,655.38
93.35
173.64
6,250.92
6,182.92
1867.22
-10,210.13
6018,48465
496,06360
1177
1.71866
MWD (4)
10/672017 428r54PM
Page 3
SA (ER
�UGRLS
Annotation
TIP
KOP
COMPASS 5000.14 Build 85
ConocoPhillips
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Local Co-ordinate Reference:
Well 3M-27
Project:
Kuparuk River Unit
ND Reference:
3M-27 @ 68.00usft (3M-27)
Site:
Kupamk 3M Pad
MD Reference:
3M-27 @ 68.00usft (3M-27)
Well:
3M-27
North Reference:
True
Wellbore:
3M-27
Survey Calculation Method:
Minimum Curvature
Design:
3M-27
Database:
EDT Alaska Sandbox
Survey
10/62017 4: 28.54PM Page 4 COMPASS 5000.14 Build 85
ffiap
Map
Vertical
MD
Inc
Azi
TVD
NDSS
(N/S
+E/ -W
Northing
Fasting
DLS
Section
Survey Tool Name Annotation
(usft)
(`)
(°)
(usft)
(usR)
(usR)
(usR)
(ft)
(R)
(°71000
IRI
13685.26
94.15
174.32
6,248.96
6,180.96
1,857.57
-10,207.01
6.018,455.00
49,08675
3.51
1,745.46
MWD(4)
13,716.03
93.75
177.29
6,246.84
6,178.84
1,826.96
-10,204.76
6,018,424.39
496,089.02
9.72
1,773.45
MWD (4)
13,745.75
90.89
177.32
6,245.64
6,177.64
1,797.30
-10,203.36
6,018,394.74
496,090.44
9.62
1800.85
MWD(4)
13,775.25
89.32
178.07
6,245.59
6,177.59
1,767.82
-10,202.18
6,018,365.27
496,091.65
5.90
1,828.14
MWD (4)
13,805.61
88.65
180.01
6,246.13
6,178.13
1,737.47
-10,201.67
6.018,334.92
496,092.19
6.76
1,856.48
MWD (4)
13,835.33
89.57
184.53
6,246.59
6,178.59
1,707.79
-10,202.85
6,018,305.24
496,091.03
15.52
1,884.78
MWD(4)
13,865.64
90.92
185.95
6,246.46
6,178.46
1,677.71
-10,205.61
6,018,275.16
496,088.30
6.49
1.913.99
MWD (4)
13,895.53
91.10
189.41
6,245.93
6,177.93
1,648.00
-10,209.61
6,018,245.44
496,084.32
11.55
1,943.28
MWD (4)
13,924.97
91.72
192.09
6,245.20
6,177.20
1,619.08
-10,215.10
6,018,216.53
49,078.86
9.34
1,972.33
MWD (4)
13.955.61
90.71
196.42
6,244.55
6,176.55
1,589.40
-10,222.64
6,018,186.85
49,07134
14.51
2,002.80
MWD (4)
13,985.57
87.73
1%.08
6,244.96
6,176.96
1,560.64
-10,231.02
6,018,158.08
49,062.98
10.01
2,032.69
MWD (4)
14,015.53
88.25
200.17
6,246.01
6,178.01
1,532.19
-10,240.34
6,018,129.63
496,053.70
13.75
2,062.61
MWD (4)
14,045.25
88.74
202.81
6,246.79
6,178.79
1,504.55
-10,251.22
6,018,101.98
496,042.84
9.03
2,092.31
MWD (4)
14,077.86
86.%
205.95
6,247.45
6,179.45
1,474.84
-10,264.68
6,018,072.26
496,029.40
9.69
2,124.63
MWD (4)
14,105.39
89.26
207.48
6,247.88
6,179.88
1,450.27
-10,277.05
6,018,047.68
496,017.03
5.67
2,152.15
MM (4)
14,135.09
89.54
210.71
6,248.19
6,180.19
1,424.32
-10,291.49
6,018,021.73
496,00264
10.92
2,181.47
MM (4)
14,165.33
90.64
214.45
6,248.14
6,180.14
1,398.85
-10,307.77
6,017,996.24
495,986.38
12.89
2.210.98
MWD (4)
14,195.30
92.18
217.65
6,247.40
6,179.40
1,376.63
-10,325.40
6,017,972.01
495,968.78
11.85
2,239.77
MWD (4)
14,225.38
93.28
219.67
6,245.97
6,177.97
1,351.17
-10,344.17
6,017,948.53
495950.03
7.64
2,268.23
MM (4)
14,255.13
94.92
222.23
6,243.84
6,175.84
1.328.76
-10,363.61
6,017,926.11
495,930.61
10.20
2,295.94
MWO(4) -
14,285.12
93.41
223.15
6,241.66
6,173.66
1,306.77
-10,383.89
6,017.904.11
495,910.35
5.89
2,323.53
MWD (4)
14,315.07
93.75
225.58
6,239.79
6,171.79
1,285.41
-10,404.79
6,017,882.73
495,869.47
8.18
2.350.76
MWO(4)
14,345.20
93.94
228.38
6,237.77
6,169.77
1,264.90
-10,426.77
6.017,862.20
495,861.51
9.29
2,377.55
MWD (4)
14,375.37
94.46
23150
6,235.56
6,167.56
1,245.54
-10,449.79
6,017,842.62
495,844.50
10.46
2,403.62
MM (4)
14,427.00
94.6
231.50
6,231.55
6,163.55
1,213.49
-10,490.08
6,017,810.75
495,809.25
0.00
2,447.51
PROJECTED to TD
10/62017 4: 28.54PM Page 4 COMPASS 5000.14 Build 85
THE STATE
°fALASKA
GOVERNOR BILL WALKER
J. Ohlinger
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
P.O. Box 100360
Anchorage, AK 99510-0360
Alaska Gil and Gas
Conservation Commission
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M-27AL3
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 217-057
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.olaska.gov
Surface Location: 892' FNL, 1574' FEL, Sec. 25, T13N, R8E, UM
Bottomhole Location: 4902' FNL, 1582' FEL, Sec. 22, T13N, R8E, UM
Dear Mr. Ohlinger:
Enclosed is the approved application for permit to drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 217-053, API No. 50-029-
22637-01-00. Production should continue to be reported as a function of the original API number
stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this _day of April, 2017.
STATE OF ALASKA
AL, .A OIL AND GAS CONSERVATION COMB/@` _)N
PERMIT TO DRILL
20 AAC 25.005
'IIwG1VCV
APR 11 2011
AOGCC
1 a. Type of Work:
11b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑
1c. Specify if well is proposed for:
Drill ❑ Lateral - ❑�
Stratigraphic Test ❑ Development - Oil D • Service - Wini ❑ Single Zone ❑� -
Coalbed Gas ❑ Gas Hydrates ❑
Redrill ❑ Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket Q . Single Well ❑
11. Well Name and Number:
ConocoPhillips Alaska Inc
Bond No. 5952180 •
KRU 3M-27AL3
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 14375' TVD: 6231"
Kuparuk River Pool /
Kuparuk River Oil Pool.
4a. Location of Well (Governmental Section):
Surface: 892' FNL, 1574' FEL, Sec 25, Tl 3N, RBE, UM
7. Property Designation (Lease Number):
ADL 355032 5)
Top of Productive Horizon:
8. Land Use Pe it:
13. Approximate Spud Date:
3617' FNL, 986' FEL, Sec 22, T13N, R8E, UM
ALK 3576
4/24/2017
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
4902' FNL, 1582' FEL, Sec 22, T1 3N, R8E, UM
549&
3700'
41b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 68'
15. Distance to Nearest Well Open
Surface: x- 506294 y- 6016606 Zone- 4
GL Elevation above MSL (ft): 27'
to Same Pool: 1508', 3M-23
16. Deviated wells: Kickoff depth: 12825 feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 97 degrees •
Downhole: 4305 Surface: 3684
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.7# L-80 ST -L 1600'
12775' 6254' 14375' 6231' Slotted
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
13016' 6440' N/A 12926' 6372' 12907'
Casing Length Size Cement Volume MD TVD
Conductor 121' 16" 200 CF 121' 121'
Surface 5928' 9-5/8" 1300 sx AS III, 690 sx Class G 5996' 3465'
Production 12938' T' 200 sx Class G 13006' 6432'
Perforation Depth MD MY 12696'- 12708', 12724' - 12744', Perforation Depth TVD (ft): 6198'- 6207', 62191- 6234',
12764'- 12784' 6249'- 6264'
20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis ❑
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 require nts ❑✓
21. Verbal Approval: Commission Representative: Date T/7
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not eith Herring @ 263-4321
be deviated from without prior written approval. Contact
Email Keith. E. Herrin0(rDCOD.COr11
Printed Name J. Ohlinger Title Staff CTD Engineer
Signature Phone 265-1102 Date
Commission Use Only
Permit to DrillAPI
Number: 97 I -�
Number:
rr��p !!\\
50-�C) -�
Permit Approval
Date: Z{_�L,�j.(-(
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ,/
Other: BLIP flsf -47-0010 a a q Samples req'd: Yes ❑ N,[ Mud log req'd: YesEJNIW(
V �t * H,S,mm�eeaas ret: Yes [f Nom❑l Directional svy req'd: Yes [j No ❑
/1-0" f/iGi r�P�-t ✓,{tvl 'tL�✓d7�n'S,. �JY S cing6eBxceUP`i6n re ' Yes IJ ❑
T req'd: Yes No
A Yu r/anCc / v .2egA Ie zs Q ! ❑ No Inclination -only injection
s(� Post initial injection MIT req'd: Yes ❑ NoET
IS�jI'Gcs7ttC/ �o a6lor.✓ /G72= kic,�o Poirrl-d-o ii�any J7v%nt�clon 7`hc �Ottrtvt�'
�at<ra. 1.
APPROVED BY �r
Approved COMMISSIONER THE COMMISSION Date: /r
Submit Form and
Form 10-401 (Revised 11/2015) a t a d r months from the date of approval (20 AAC 25.005(8)) Attachments in Duplicate
'0gviyi, OfG�N
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
April 7, 2017
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
RECEIVE®
APR 11 2017
AOGCC
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill eight laterals out of the KRU 3M-27
(PTD# 195-214) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin in May 2017. The objective will be to drill the 8 laterals KRU 3M -27A,
3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M-27AL4, 3M-27AL4-01, and 3M-27AL4-02 targeting the
Kuparuk A and C -sands.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC
25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being
limited to 500' from the original point.
Attached to this application are the following documents:
— Permit to Drill Application Forms (10-401) for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02
— Detailed Summary of Operations
— Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02
— Current wellbore schematic
— Proposed CTD schematic
The application for sundry approval (10-403) for 3M-27 was approved on 3/16/2017.
If you have any questions or require additional information, please contact me at 907-263-4321.
Sincerely,
Keith Herring
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Kuparuk CTD Laterals
3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02
Application for Permit to Drill Document
1. Well Name and Classification........................................................................................................ 2
(Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b)).......................................................................--........................................2
2.
Location Summary.......................................................................................................................... 2
(Requirements of 20 AAC 25.005(c)(2)). ................................................................................................................................................. 2
3.
Blowout Prevention Equipment Information................................................................................. 2
(Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2
4.
Drilling Hazards Information and Reservoir Pressure.................................................................. 2
(Requirements of 20 AAC 25.005(c)(4)).................................................. ....................... ...................................................... .................. 2
5.
Procedure for Conducting Formation Integrity tests................................................................... 2
(Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2
6.
Casing and Cementing Program.................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................3
7.
Diverter System Information..........................................................................................................3
(Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3
8.
Drilling Fluids Program.................................................................................................................. 3
(Requirements of 20 AAC 25.005(c)(8))..................................................................................................................................................3
9.
Abnormally Pressured Formation Information.............................................................................4
(Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4
10.
Seismic Analysis...........:.................................................................................................................4
(Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4
11.
Seabed Condition Analysis............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4
12. Evidence of Bonding...................................................................................................................... 4
(Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4
13. Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4
Summaryof Operations...................................................................................................................................................4
LinerRunning...................................................................................................................................................................7
14. Disposal of Drilling Mud and Cuttings.......................................................................................... 7
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 7
15. Directional Plans for Intentionally Deviated Wells....................................................................... 6
(Requirements of 20 AAC 25.050(b)) ....... -............................................................................................................................................. 7
16. Attachments....................................................................................................................................8
Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02......................................8
Attachment 2: Current Well Schematic for 3M-27...........................................................................................................8
Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02........................8
Page 1 of 8 April 7, 2016
PTD.,pplication: 3M -27A, AL1, AL2, AI -4-01, AL3, AL4, AI -4-01, AI -4-02
1. Well Name and Classification
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))
The proposed laterals described in this document are 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-
27AL3, 3M-27AL4, 3M-27AL4-01, & 3M-27AL4-02. All laterals will be classified as "Development -Oil' wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A and C sand package in the Kuparuk reservoir. See attached 10-401 form for
surface and subsurface coordinates of the 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M-
27AL4, 3M-27AL4-01, & 3M-27AL4-02.
3. Blowout Prevention Equipment Information
(Requirements of 20 AA C 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
- Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,200 psi. Using the
maximum formation pressure in the area of 4,305 psi in 3M-12 (i.e. 13.4 ppg EMW), the maximum
potential surface pressure in 3M-27, assuming a gas gradient of 0.1 psi/ft, would be 3,684 psi ./ See
the "Drilling Hazards Information and Reservoir Pressure" section for more details.
- The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 3M-27 was measured to be 3,591 psi (11.1 ppg EMW) on 9/5/2016. The
maximum downhole pressure in the 3M-27 vicinity is to the southeast in the 3M-12 injector at 4,305 psi (13.4
ppg EMW) from August of 2016.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
None of the offset injection wells to 3M-27 have injected gas, so there is a low probability of encountering free
gas while drilling the 3M-27 laterals. If gas is detected in the returns the contaminated mud can be diverted to a
storage tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 3M-27 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 3M-27 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity
test is not required.
Page 2 of 8 April 7, 2016
PTD application: 3M -27A, AL1, AL2, All -i-01, AL3, AL4, AL4-01, AL4-02
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm MD
MD
MD
TVDSS
TVDSS
Conductor
31111-27A
13150'
15200'
6187'
6135'
2-3/8", 4.7#, L-80, ST -L slotted liner;
0'
121'
1640
630
Surface
aluminum billet on to
3M-27ALl
13100'
15200'
6190'
6105'
2-3/8", 4.7#, L-80, ST -L slotted liner;
3465'
5750
3090
Production
7"
aluminum billet on to
3M-27AL2
14130'
16200'
6127'
6062'
2-3/8", 4.7#, L-80, ST -L slotted liner;
7240
1 5410
Tubing
3-112"
9.3
aluminum billet on to
3M-27AL2-01
12825'
16200'
6203'
6077'
2-3/8", 4.7#, L-80, ST -L slotted liner;
1 10540
aluminum billet on to
3M-27AL3
12775'
14375'
6186'
6163'
2-3/8", 4.7#, L-80, ST -L slotted liner;
aluminum billet on to
3M-27AL4
12825'
15200'
6203'
6135'
2-3/8", 4.7#, L-80, ST -L slotted liner;
aluminum billet on to
3M-27AL4-01
12875'
16200'
6204'
6062'
2-3/8", 4.7#, L-80, ST -L slotted liner;
aluminum billet on to
3M-27AL4-02
12583'
14375'
6046'
6167'
2-3/8", 4.7#, L-80, ST -L slotted liner;
u into 3-1/2" tubing
Existing Casingkiner Information
Category
OD
Weight
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
0'
121'
0'
121'
1640
630
Surface
9-518"
40.0
L-80
BTC
0'
5996'
0'
3465'
5750
3090
Production
7"
26.0
L-80
BTC -MOD
0'
13006'
0'
6432'
7240
1 5410
Tubing
3-112"
9.3
L-80
EUE
0'
12598'
0'
6125'
10160
1 10540
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
Window milling operations: Chloride -based FloVis mud (8.6 ppg)
Drilling operations: Chloride -based RoVis mud (8.6 ppg) This mud weight will not hydrostatically
overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide
formation over -balance and wellbore stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
Page 3 of 8 April 7, 2016
f
PTD application: 3M -27A, AL1, AL2, AU -01, AL3, AL4, AL4-01, AL4-02
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
'Blowout Prevention Equipment Information
In the 3M-27 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Pressure at the 31VI-27 Window (12725' MD, 6220' TVD) Using MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7"
production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north,
west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing
recovery.
Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588'
MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with
cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing.
Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical
whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at
12725' MD to drill and complete the 3M-27 laterals.
Page 4 of 8 April 7, 2016
Pumps On 1.5 bpm)
Pumps Off
A/C -sand Formation Pressure 11.1
3591 psi
3591 psi
Mud Hydrostatic 8.6
2782 psi
2782 psi
Annular friction i.e. ECD, 0.08psi/ft)
1018 psi
0 psi
Mud + ECD Combined
no chokepressure)
3800 psi
overbalanced -209psi)
2782 psi
underbalanced -809psi)
Target BHP at Window 11.8
3817 psi
3817 psi
Choke Pressure Required to Maintain
Target BHP
17 psi
1035 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7"
production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north,
west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing
recovery.
Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588'
MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with
cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing.
Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical
whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at
12725' MD to drill and complete the 3M-27 laterals.
Page 4 of 8 April 7, 2016
PTD Application: 3M -27A, AL1, AL2, ALi-01, AL3, AL4, AL4-01, AL4-02
The 3M -27A sidetrack will exit the cement pilot hole at 12725' MD and TD at 15200' MD, targeting the
Al sand to the north. It will be completed with 2-3/8" slotted liner from TD up to 13150'MD with an
aluminum billet for kicking off the 3M-27AL1 lateral.
The 3M-27AL1 lateral will drill to the north to a TD of 15200' MD targeting the C4 sand. It will be
completed with 2-3/8" slotted liner from TD up to 13100' MD with an aluminum billet for kicking off the
3M-27AL2 lateral.
The 3M-27AL2 lateral will drill to the west to a TD of 16200' MD targeting the C4 sand. It will be
completed with 2-3/8" slotted liner from TD up to 14130' MD with an aluminum billet for kicking off the
3M-27AL2-01 lateral.
The 3M-27AL2-01 lateral will drill to the west to a TD of 16200' MD targeting the A 1 sand. It will be
completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the
3M-27AL3 lateral.
The 3M-27AL3 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be
completed with 2-3/8" slotted liner from TD up to 12775' MD with an aluminum billet for kicking off the
3M-27AL4 lateral.
The 3M-27AL4 lateral will drill to the north to a TD of 15200' MD targeting the Al sand. It will be
completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the
3M-27AL4-01 lateral.
The 3M-27AL4-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be
completed with 2-3/8" slotted liner from TD up to 12875' MD with an aluminum billet for kicking off the
3M-27AL4-02 lateral.
The 3M-27AL4-02 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be
completed with 2-3/8" slotted liner from TD up to 12583' MD.
Pre -CTD Work
1. RU Slickline: Obtain SBBP, dummy off gas lift mandrels, and pressure test.
2. RU E -line: Punch 2' of holes in the 3-1/2" tubing tail at 12583' MD.
3. RU Pumping Unit: Perform injectivity test down the tubing.
4. RU Service Coil: Mill out "D" nipple and cement squeeze the A/C -sand perforations up to the holes
in the tubing tail.
5. RU Slickline: Tag top of cement and pressure test cement.
6. Prep site for Nabors CDR3-AC rig and set BPV.
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 3M -27A Sidetrack (Al sand - north)
a. Mill 2.80" high -side pilot hole through the cement to 12755' MD.
b. Caliper pilot hole.
c. Set top of whipstock at 12725' MD.
d. Mill 2.80" window at 12725' MD.
e. Drill 3" bi-center lateral to TD of 15200' MD.
f. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13150' MD.
Page 5 of 8 April 7, 2016
PTD ,Application: 3M -27A, AL1, AL2, AL, -01, AL3, AL4, Al -4-01, AL4-02
3. 3M-27AL1 Lateral (C4 sand - north)
a. Kickoff of the aluminum billet at 13150' MD.
b. Drill 3" bi-center lateral to TD of 15200' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13100' MD.
4. 3M-27AL2 Lateral (C4 sand - west)
a. Kickoff of the aluminum billet at 13 100'MD.
b. Drill 3" bi-center lateral to TD of 16200' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 14130' MD.
5. 3M-27AL2-01 Lateral (Al sand -west)
a. Kickoff of the aluminum billet at 14130' MD.
b. Drill 3" bi-center lateral to TD of 16200' NM.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD.
6. 3M-27AL3 Lateral (Al sand - south)
a. Kick off of the aluminum billet at 12825' No.
b. Drill 3" bi-center lateral to TD of 14375' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12775' MD.
7. 3M-27AL4 Lateral (Al sand -north)
a. Kick off of the aluminum billet at 12775' MD.
b. Drill 3" bi-center lateral to TD of 15200' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD.
8. 3M-27AL4-01 Lateral (Al sand -west)
a. Kick off of the aluminum billet at 12825' MD.
b. Drill 3" bi-center lateral to TD of 16200' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12875' MD.
9. 3M-27AL4-02 Lateral (Al sand- south)
a. Kickoff of the aluminum billet at 12875' MD.
b. Drill 3" bi-center lateral to TD of 14375' MD.
c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 12583' MD.
10. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CDR3-AC rig.
Post -Rig Work
1. Pull BPV.
2. Obtain SBHP.
3. Install gas lift design.
4. Return to production.
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
Page 6 of 8 April 7, 2016
PTD r%pplication: 3M -27A, AL1, AL2, AU,01, AL3, AL4, AI -4-01, AI -4-02
- Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slickline.
- When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
- The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
- The 3M-27 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids"
section for more details.
- While running 2-3/8" slotted liner, a joint of 2-318" non -slotted tubing will be standing by for emergency
deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a
deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide
secondary well control while running 2-3/8" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
- The Applicant is the only affected owner.
- Please see Attachment 1: Directional Plans
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
- MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
- Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name
Distance
3M -27A
2900'
3M-27AL1
2900'
3M-27AL2
900'
3M-27AL2-01
900'
3M-27AL3
3700'
3M-27AL4
2900'
3M-27AL4-01
900'
3M-27AL4-02
3700'
- Distance to Nearest Well within Pool
Lateral Name Distance Well
3M -27A 2270' 3M-25
3M-27AL1 2270' 3M-25
Page 7 of 8 April 7, 2016
r
PTD application: 3M -27A, AL1, AL2, AU,. -01, AL3, AL4, AL4-01, AL4-02
3M-27AL2
5065'
3M-25
3M-27AL2-01
5065'
3M-25
3M-27AL3
1508'
3M-23
3M-27AL4
2270'
3M-25
3M-27AL4-01
5065'
3M-25
3M-27AL4-02
1508'
3M-23
16. Attachments
Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals
Attachment 2: Current Well Schematic for 3M-27
Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals
Page 8 of 8 April 7, 2016
ConocoPhillips
Project: Nupatuk Rlver Unit
Site: Kuparuk 3M Pad
abnum. I11x.�u=xmn
fte.' : msa
weKto l„a
WELLBORE DETAILS: 3M -27A
REFERENCE INFORMATION
parent Welepre: 3M-27
C.Idae.e (NIE) We.., Weld JM -n, Tme NOM
Wall 3M-27
aaeoan. 57t.xmn
Tie on MD: 12682.46
Vc.I ISWI RNaenm'. 3M,27 ® aBAoiW CW27)
Wellbore: 3M -27A
W nnam m.m•
5e�l;gi Ws7 Relexrca' W (o.wN, OmE)
Plan: 3M -27A wp61 (31611-27131111(31611-27131111Mm.l:
pM..7ltrq,7
eaoMmle
Meesure0 oeeul wlueras JM37�680awttIJM21)
cakwaf.n Met W: A9rdmam arvaWro
nsol
M
6500
M �71M. IAL]
nM] {I �—'3111/M ]A. I
1h1 InM ] 1.1i ]M 2l M ]M1I I
5850
1 tsv
tOm _
\1 Il/
Uf-I9
/i IIL
6 h _ J— )nl Itl/tM IM
t
5200 ! —{ JJ — .I y,2
110 e)
I F
---
. b
AM
I2 WIIM IMI
0
El 32501
.. 3M..13lTV-IS _ASO
;M nl.v v o A
2600 ^`� \_
O
iM4 NJM-M1
10NtN.Io.---
v1300 _ lh . :A1 :0 S 1M to lt1 A 6
�.'.
c o
p 650
� A • i llA{M/iM I(
O _650 _.��— a , ' `8
.LI IOOMI _� _'
-I300�..
-1950
s g
I1,MMM. J9hN/lMe-2}N1L11P9POPt
1I.
-3600 PbM.IMI.
bn
c' nl1] 0 ` e0N/ WJ4]b 5 w
-1250 -- -� k fi _ fin p. • 0 _VA-O>'1M.o_ iM� I!)Myl ._._
M24 124LI IPBI - v” rv�u 111 -I81 L,iM."I
IR /
-3900 41"_
4550 --� ]M A/3M �LI4
2 1M 24iM2b �•. Gg' .U21ItM-:I H_ f00 i1 M 3 — �� ._
-5200 JM -2F11 �'ep ,Ib:'01,1: ') 4'0� tll
6500 15 13 7nTl
-7150 5
3M-2] @ 613.6 .9 50-13 00 0-1 2 3 5 0-11]00-11050-.0400 -9]50 Af 00 -8450 -]800 -0150 -6500 -5850 -5200 -4550 -3900 -3250 -2600 -1950 -130D -650 0 650 ❑00 1950 2600 3250 3900 4550 5200 5850 6500 7150 7800
9M 1/ West( -)/East(+) (650 usft/in)
rias
BAKER
KUP PROD 3M-27
COIIOCOiaAlOhpS 3 MaxAngle&MD iD
WenbCooAributes
AlaSka,lnc. weveem Avlmwl Fieltl Neme WBllborefialus ncl ('1 MGIflNBI ACIBM (flN31
50029063700 KUPARUKRIVERUNB PROD ]2.19 3.M.90 13,0060
Comment Hos (ppm) Ogle AnnoWion EnoON NBL,tl (16 Ng --- 0x10
Aulke' mdom6:UnPM SSSV: NWPLE 220 101232015 Pension
3/17120118 111W1996
Mnelallen OapN lttNal Ena Dab
MnolWan fut Notl By
......_,.___.__..._...__.._..._..._..
..._......... Last Tag: ELM 12,86]0 922016
Ie.
Rev Reeson:H250TAG ppmven 9162016
asng rings
'
Ca¢InA crou. 90(in)fO gnl Top((IKS) Sel Oep1l drKe) Sel Oepte (NnL.. WNLen ll.. GnEe Tnp Tnwa
CONDUCTOR 16 15.1162 42.0 1210 1219 fi256 H-40 WELDED
1
(
Cazing Oe¢niPllon OD(inl ID lint TaP IKKO) SeI DePtn IttN01 Set pepN (rVD).. WIILen IL.. Cmaa TBP ones
SURFACE 9518 8835 41.0 5,995.9 3.465.3 4000 LA0 BTC
Ca¢ing OeSWptlon OO lin) IO6n) Tep lfl%O) Sel neple l.Naf 581 pepih (iVD1... Wnlan(I...Gnae Tap -1
PRODUCTION > rr6 385 13,0060 6432.3 28.011 LA0 BTC -MOD
Tubing Strings
CONDUCTOR 42.0-a1.0
mhmP Ceac;mnnn Smng Ma_m(Inl TnP(nNe) sel0evm n_sot 0nv01(NO)(... wlpexp G,aae Tepeonneetmn
TUBING 3112 2992 9.9 12,5395 6,9622 9.30 L-60 EUEB1dABMOO
Completion Details
NommalIn
Top(--) Top(NO)(.) Tupma(') vein Des coin (In1
9.8 99 002 HANGER FMC GEN IV TUBING HANGER 3500
Guo uFr; 3.Y3J
495.1 494.7 6.65 NIPPLE CAMCO DS LANDING NIPPLE 2.875
12,433.1 6,0052 45.12 SLEEVE BAKERCMU SLIDING SLEEVE 2.812
12,482.6 6,040.5 43.55 SEALABSV BD40 SEALS LCCATOR4TSPACE OUT 2AW
12,484.8 6,042.2 43.40 PER BAKER 0640 PER 4.000
12,498.2 6,051.9 43.05 Packer BAKER FHL PACKER 2.900
SURFACE41,0 s.335s
12,515.1 0064.3 42.70 NIPPLE X NIPPLE 2.813
8,532.6 6,077.2 4259 OVERSHOT BAKER PO -BOY OVERSHOTw16.09 SWALLOW 3.625
GAa Uk Tfl913.1
inhlnP @snipven Stang M. lnlinl inp lRNa) sol oePlh dt set Devt6(ND) (... wl pan) Greae TOP Connoclian
TUBING -Original 31/2 2.992 1$5335 12,59>.9 8,1254 9.30 L-60 ABM EUE
Completion Details
ominal lO
Tap (.Eh Top (NO)(tIKB) Top Incl (') INm Oes Co. (m)
cAs uFT:9Afi1A
125495 6,0999 4249 1 NIPPLE CAMCOWNIPPLE 2812
12557.5 6.095.5 42.44 PBR KER BAPBW) 10' STROKE 3.000
12,5705 6.1052 4236 PACKER BAKER FHL PACKER 3000
13,5879 M1B.0 I 4228 NIPPLE CAMCO O NIPPLE 275D
GPS LIFT; 11A.e3
4,597,2 6,124.8 42.29 1 SOSML BAKERSHEAROUTSUB 3.015
Other in Hole (Wiregne retrlevable plugs, valves, pumps, fish, etc.)
Top (ND) Topmel
Top BK3) "K3) 1') 0ez Com Run Dale loon)
GAS UM MA7ai
12,727g 6,221.9 4120 Fish 1 112" OV on RK Dropped Downhole 1226/1997 12/2611997
12,8640 6,3252 4094 Fsh 1-GLVon BKLoatdownhole621996 621996
12,911.0 6,360.7 41.07 Fish JUNK Milled up prematurely set packer83IM' 5141998
Tailpipe assembly, Pushed JUNK to bottom on
5296
SLEEVE; 12,433.1
Perforations & Slots
pone
oem
Top
a
(show
(nKe)
Sem deanInns)KO)
M(nKe)e)
mna
0m
0
type
sem
sEAt Asst: 121o28
12,696.0
12.708.0
5.195.6
6,207.6
Cd, 3M27
9162008
6.0
APERF
2.5' PJ 4W 2506, 00
MR. 1?41Bs
deg PHASE
F.Wr, Ra6es
12,724.0
12744.0
8,219.7
5,234.7
C4,3M27
5112/1996
4.01PERF
180 deg. phasing;
90 deg F/ IowtlLe of
hole; 21M' Eneclet
12,764A
12)84.0
6,249.8
6,264.9
M. 31A-27
7/201999
4.0
APERF
100 deg plusifg;(+/_)
NIPPLE; 12515.1
90 deg VlowBide Of hole;
2.5"HSD
Mandrel Inserts
at
ni
on X Top grKS) TMOO Make 00 Iry Valve TypeUch Po(in) TRO Run
pn Type T (in) (Poll OR IWnwn Co.
1 3,543.1 2,599.4 CAMC0 1 GAS LIFT GLV BK 0.125 1,338.0 4Ra2DDB
2 fi,918.1 3,801.5 DAMDD 1 GAS LIFT GLV BK 015fi 1,367.0 4/6)20083
j
9,761.8 4,800.1 CAMCO 1 GAS LIFT GLV BK 0.188 14/812008II.dro.8
5,5467 CAMCO 1 GAB LIFT GLV BK 0.1881 4161200812,3781
5,9689 CAMCO 1 GAS LIFT OV BK 0.250 0.0 41512008
Notes General & Safety
End Dale I AnnoWon
5/252005 NOTE:3' sleeve patch installed Over SURF CSGetemal comeou0'A'
1112 9 /20 1 0 NOTE:VimsmemwieWAlaska SchematiO.0
APFAF; 12,6060-12,1N.
F¢1412]21A
IFERF; 1;724A -12.244A----
APERF;IZ754O12.TYA-
Flak l o"o
FI¢I{ 12.811.0
PRODUCTION; 33S1Jp060
3M-27 Proposed CTD Schematic
121' MD
9-5/8" 36# L-80
shoe @ 5996' MD
C -sand parts
12,696' - 12,708' MD
12,724' - 12,744' MD
IKOP 90 12,725' MD I
IA -sand perfs
12,7641- 12,784P MD
F7"-26# L-80 shoe @
13,006' MD
3-1/2" Cameo DS Landing Nipple @ 495' MD (ID = 2.875")
3-1/2" 9.3# J-55 EUE 8rd Tubing to surface
3-1/2" Cameo MMG gas lift mandrel
@ 3543', 6918', 9762', 11,666'.12,378-
Baker
1,666',12,378'Baker CMU Sliding Sleeve @ 12,433' (2.813" ID X -profile)
Baker 80-40 PBR @ 12,485' MD (4.00" ID)
Baker FHL packer @ 12,498' MO (2.90" ID)
X Nipple @ 12,515' MD (2.813" ID)
Baker Po -Boy Overshot @ 12,533' MD
Cameo W Nipple @ 12,550' MD (2.812" ID)
Baker PBR @ 12,558' MD (3.00" ID)
Baker FHL packer @ 12,571' MD (3.0" ID)
3-1/2" Cameo D nipple @ 12,588' MD (ID = 2.75")
(Milled out to 2.80" ID for CTD)
3-1/2" tubing tail @ 12,597' MD
3W27AL3 wp02 iwulh)
TO ®14,375' MD
Liner Blllel 12,775' MD
3M-27AL4-01 wp00 (wast)
TD @ 16,200' MD
Liner Billet @ 12,876 MD
3 VI 27AL4-02 wp00 (south)
T0? 14,375' MD
LinerT 12,583'Me
3M-27AL201 wp01 (wes)
TD 16,200' 2.
Lima BiOet 12,825 MO
3M-27A6,2MD eag
TO 18,200'00, MD
Liner Billet Q 14130' MD
TD @ 15,200' MD
Liner Billet13,100' MD
3M -27A wp01 (north)
TD C 15,200' MD
Liner Billet @ 13, 150 MD
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 3M Pad
3M-27
3M-27AL3
Plan: 3M-27AL3_wp02
Standard Planning Report
03 April, 2017
rias
BAKER
HUGHES
ConocoPhillips
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 3M Pad
Well:
3M-27
Wellbore:
3M-27AL3
Design:
3M-27AL3_wp02
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
r
Well 3M-27
Mean Sea Level
3M-27 @ 68.00usft (3M-27)
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
AN
BAKER
HUGHES
Site Kuparuk 3M Pad
3M-27
+N/ -S
+E( -W
0.00 usft Northing:
0.00 usft Easting:
0.00 usft Wellhead Elevation:
Site Position:
Northing:
6,016,202.17 usft
Latitude: 70° 27' 19.780 N
From: Map
Easting:
506,126.99 usft
Longitude: 149° 56'59.998 W
Position Uncertainty: 0.00 usft
Slot Radius:
0.000 in
Grid Convergence: 0.05 °
Well
Well Position
Position Uncertainty
3M-27
+N/ -S
+E( -W
0.00 usft Northing:
0.00 usft Easting:
0.00 usft Wellhead Elevation:
6,016,606.24 usft
506,294.30 usft
usft
Latitude:
Longitude:
Ground Level:
Measured
Wellbore
3M-27AL3
Dogleg
Build
Magnetics
Model Name
Sample Date
Declination
(°I
Dip Angle
(0)
System
BGGM2016 7/1/2017
_
17 53
81 00
Design
3M-27AL3_Wp02
(usft)
(°)
(°)
(usft)
Audit Notes:
(usft)
(°1100ft)
(°I100ft)
(°1100ft)
(°) Target
Version:
80.95
Phase: PLAN
6,202.80
Tie On Depth:
12,82!
Vertical Section:
000
Depth From (TVD)
-NAS
+E/ -W
Direction
253.79
6,204.00
(usft)
(usft)
(usft)
(°)
-38.76
300.00
0.00
0.00
0.00
200.00
70° 27' 23.753 N
149° 56'55.073 W
0.1 usft
Field Strength
(nT)
57,543
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/ -S
+EbW
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°1100ft)
(°I100ft)
(°1100ft)
(°) Target
12,825.00
80.95
280.92
6,202.80
2,562.10
-9,972.76
0.00
000
0.00
0.00
12,895.00
97.12
253.79
6,204.00
2,558.87
-10,041.80
45.00
23.09
-38.76
300.00
13,035.00
93.22
190.61
6,189.94
2,460.69
-10,130.49
45.00
-2.78
-45.13
270.00
13,185.00
92.08
180.16
6,182.98
2,311.72
-10,144.53
7.00
-0.76
-6.97
264.00
13,320.00
89.62
171.04
6,180.98
2,177.28
-10,134.18
7.00
-1.82
-6.76
255.00
13,520.00
88.18
184.97
6,184.85
1,977.94
-10,127.22
7.00
-0.72
6.96
96.00
13,745.00
90.14
200.60
6,168.16
1,759.23
-10,176.84
7.00
0.87
6.95
83.00
14,200.00
93.28
232.31
6,174.20
1,398.06
-10,443.50
7.00
0.69
6.97
84.00
14,375.00
94.27
220.07
6,162.64
1,277.41
-10,569.28
7.00
0.56
-6.99
275.00
4/32017 2:58:53PM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips nos
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Local Co-ordinate Reference:
Well 3M-27
Company:
ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project:
Kupamk River Unit
MD Reference:
3M-27 @ 68.00usft (3M-27)
Site:
Kuparuk 3M Pad
North Reference:
True
Well:
3M-27
Survey Calculation Method:
Minimum Curvature
Wellbore:
3M-27AL3
Map
Map
Design:
3M-27AL3_wp02
System
+N/ -S
Planned
Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination
Azimuth
System
+N/ -S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(')
(`)
(usft)
(usft)
(usft)
(usft)
(-1100ft)
(')
(usft)
(usft)
12,825.00
80.95
280.92
6,202.80
2,562.10
-9,972.76
1,003.30
0.00
0.00
6,019,159.65
496,320.38
TIP/KOP
12,895.00
97.12
253.79
6,204.00
2,558.87
-10,041.80
1,029.95
45.00
-60.00
6,019,156.37
496,251.35
Start 45
dls
12,900.00
97.11
251.52
6,203.38
2,557.39
-10,046.53
1,032.96
45.00
-90.00
6,019,154.88
496,246.62
13,000.00
94.82
206.32
6,192.41
2,493.70
-10,119.47
1,117.75
45.00
-90.28
6,019,091.14
496,173.74
13,035.00
93.22
190.61
6,189.94
2,460.69
-10,130.49
1,152.54
45.00
-95.24
6,019,058.12
496,162.75
End 46 dls, Start 7 dis
13,100.00
92.74
186.08
6,186.56
2,396.48
-10,139.91
1,216.10
7.00
-96.00
6,018,993.91
496,153.39
13,185.00
92.08
180.16
6,182.98
2,311.72
-10,144.53
1,297.33
7.00
-96.24
6,018,909.15
496,148.84
4
13,200.00
91.81
179.15
6,182.48
2,296.73
-10,144.44
1,311.39
7.00
-105.00
6,018,894.17
496,148.94
13,300.00
89.98
172.39
6,180.91
2,197.07
-10,137.06
1,402.51
7.00
-105.03
6,018,794.53
496,156.40
13,320.00
89.62
171.04
6,180.98
2,177.28
-10,134.18
1,420.12
7.00
-105.14
6,018,774.74
496,159.30
5
13,400.00
89.03
176.61
6,181.92
2,097.78
-10,125.57
1,491.88
7.00
96.00
6,018,695.26
496,167.97
13,500.00
88.32
183.57
6,184.23
1,997.87
-10,125.73
1,585.82
7.00
95.93
6,018,595.36
496,167.90
13,520.00
88.18
184.97
6,184.85
1,977.94
-10,127.22
1,605.06
7.00
95.77
6,018,575.42
496,166.43
6
13,600.00
88.87
190.53
6,186.91
1,898.73
-10,137.99
1,683.18
7.00
83.00
6,018,496.21
496,155.72
13,700.00
89.75
197.47
6,188.12
1,801.76
-10,162.17
1,782.56
7.00
82.86
6,018,399.24
496,131.63
13,745.00
90.14
200.60
6,188.16
1,759.23
-10,176.84
1,827.55
7.00
82.77
6,018,356.70
496,117.00
7
13,800.00
90.54
204.42
6,187.83
1,708.43
-10,197.89
1,882.48
7.00
84.00
6,018,305.88
496,095.99
13,900.00
91.27
211.39
6,186.25
1,620.12
-10,244.66
1,981.46
7.00
84.02
6,018,217.55
496,049.30
14,000.00
91.97
218.36
6,183.42
1,536.16
-10,301.77
2,078.01
7.00
84.13
6,018,135.55
495,992.26
14,100.00
92.65
225.33
6,179.38
1,463.77
-10,368.38
2,170.70
7.00
84.33
6,018,061.11
495,925.72
14,200.00
93.28
232.31
6,174.20
1,398.06
-10,443.50
2,258.14
7.00
84.61
6,017,995.33
495,850.67
8
14,300.00
93.87
225.32
6,167.96
1,332.38
-10,518.56
2,345.54
7.00
-85.00
6,017,929.60
495,775.67
14,375.00
94.27
220.07
6,162.64
1,277.41
-10,569.28
2,414.53
7.00
-85.44
6,017,874.60
495,725.01
Planned
TD at 14375.00
4/3/2017 2:58:53PM Page 3 COMPASS 5000.1 Build 74
ConocoPhillips IVAN
ConocoPhillips Planning Report BAKER
NYGMS
Database:
EDM Alaska NSK Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 3M Pad
Well:
3M-27
Wellbore:
3M-27AL3
Design:
3M-27AL3_wP02
Targets
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method;
Well 3M-27
Mean Sea Level
3M-27 @ 68.00usft (3M-27)
Tme
Minimum Curvature
Target Name
-hit/miss target Dip Angle Dip Dir. TVD +Nl-S +El -W Northing Easting
-Shape V) V) (usft) (usft) (usft) (usft) (usft)
3M -27A Faultl 0.00 0.00 6,158.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00
- plan misses target center by 1140368.01 usft at 12825.00usft MD (6202.80 TVD, 2562.10N,-9972.76 E)
- Polygon
Point 6,158.00 0.00 0.00 6,020,114.00 1,636,574.00
Point 6,158.00 1.00 1.00 6,020,115.00 1,636,575.00
3M-27AL3_Fault2 0.00 0.00
6,188.00
629.171,129,993.58
6,018,190.00
1,636,174.00
- plan misses target center by 1139967.98usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
MD (6202.80
- Polygon
- Polygon
1,636,181.00
Point
6,18B.00
0.00 0.00
6,018,190.00
1,636,174.00
Point
6,188.00
1.00 1.00
6,018,191.00
1,636,175.00
3M-27AL3_Fault2_M 0.00 0.00
0.00
629.171,129,993.58
6,018,190.00
1,636,174.00
- plan misses target center by 1139984.86usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
0.00
- Rectangle (sides W1,500.00 H1.00 D0.00)
1,991.47
6,018,709.11
1,636,352.18
Point
3M-27 CTD Polygon Sol 0.00 0.00
0.00
10.631,129,376.00
6,017,571.00
1,635,557.00
- plan misses target center by 1139368.50usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
0.00
- Polygon
-394.39
6,021,710.98
1,633,964.02
Point
Point
0.00
0.00 0.00
6,017,571.00
1,635,557.00
Point
0.00
1,549.65 635.29
6,019,121.03
1,636,190.92
Point
0.00
1,306.29 1,066.14
6,018,878.06
1,636,621.93
Point
0.00
388.33 899.40
6,017,960.05
1,636,455.98
Points
0.00
-90.36 437.97
6,017,481.02
1,635,995.00
Point
0.00
0.00 0.00
6,017,571.00
1,635,557.00
3M-27 CTD Polygon We
0.00 0.00 0.00
4,589.101,128,180.75
6,022,148.00
1,634,358.00
- plan misses target center by 1138172.21 usft at 12825.00usft
MD (6202.80
TVD, 2562.10 N, -9972.76 E)
- Polygon
1,636,181.00
Point 6,183.00 1.00 1.00 6,018,657.00
1,636,182.00
Point
0.00
0.00
0.00
6,022,148.00
1,634,358.00
Point
0.00
-2,757.14
2,351.05
6,019,393.12
1,636,711.14
Point
0.00
-3,440.92
1,991.47
6,018,709.11
1,636,352.18
Point
0.00
-2,499.35
1,383.16
6,019,650.07
1,635,743.13
Point
0.00
436.73
-394.39
6,021,710.98
1,633,964.02
Point
0.00
0.00
0.00
6,022,148.00
1,634,358.00
Latitude Longitude
70' 13'50.989 N 140' 47'43.316 W
70' 13'32.900 N 140' 48'3.201 W
70' 13'32,900 N 140' 48'3.201 W
70' 13'27.802 N 140° 48'
70' 14' 14.017 N 140' 48'37A99 W
3M-27AL3_Faulti 0.00 0.00 6,183.00 1,095.211,130,000.98 6,018,656.00
1,636,181.00
70' 13'37.414 N 140' 48'0,963 W
- plan misses target center by 1139974.68usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
- Polygon
Point 1 6,183.00 0.00 0.00 6,018,656.00
1,636,181.00
Point 6,183.00 1.00 1.00 6,018,657.00
1,636,182.00
3M-27AL3_T01 0.00 0.00 6,181.00 963.181,130,019.87 6,018,524.00
1,636,200.00
70' 13'36.104 N 140' 48'0.995 W
- plan misses target center by 1139993.75usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
- Point
3M-27AL3_T03 0.00 0.00 6,162.00 67.461,129,577.07 6,017,628.00
1,635,758.00
70' 13'28.059 N 140' 48' 17.586 W
- plan misses target center by 1139552.56usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
- Point
3M-27A_Faultl_M 0.00 0.00 0.00 2,553.021,130,395.25 6,020,114.00
1,636,574.00
70' 13'50.989 N 140' 47'43.316 W
- plan misses target center by 1140384.88usft at 12825.00usft MD (6202.80 TVD., 2562.10 N, -9972.76 E)
- Rectangle (sides W1,500.00 H1.00 D0.00)
3M-27 CTD Polygon Not 0.00 0.00 0.00 3,355.381,131,253.01 6,020,917.00
1,637,431.00
70' 13'57.516 N 140' 47' 15.219 W
- plan misses target center by 1141242.91 usft at 12825.00usft MD (6202.80 TVD, 2562.10 N. -9972.76 E)
- Polygon
Point 0.00 0.00 0.00 6,020,917.00
1,637,431.00
Point 0.00 -2,146.46 -952.80 6,018,769.95
1,636,480.11
Point 0.00 -1,769.89 -1,622.57 6,019,145.92
1,635,810.09
Point 0.00 328.43 -503.79 6,021,244.97
1,636,926.98
Point 0.00 0.00 0.00 6,020,917.00
1,637,431.00
4/3/2017 2:58:53PM Page 4 COMPASS 5000.1 Build 74
ConocoPhillips Fara.
ConocoPhillips Planning Report BAKER
HUGHES
Database:
EDM Alaska NSK Sandbox
Company:
ConomPhillips(Alaska) Inc.-Kup2
Project:
Kuparuk River Unit
Site:
Kuparuk 3M Pad
Well:
3M-27
Wellbore:
3M-Z7AL3
Design:
3M-27AL3_wp02
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 3M-27
Mean Sea Level
310-27 @ 66.00usft (3M-27)
True
Minimum Curvature
3M-27AL3 T02 0.00 0.00 6,188.00 564.22 1,129,922.52 6,018,125.00 1,636,103.00 70" 13'3Z374 N 140° 48'5.521 W
- plan misses target center by 1139897.03usft at 12825.00usft MD (6202.80 TVD, 2562.10 N. -9972.76 E)
- Point
3M-27AL3_FauR1 M 0.00 0.00 0.00 1,095.211,130,000.98 6,018,656.00 1,636,161.00 70° 13' 37.414 N 140'48'0.963 W
- plan misses target center by 1139991.56usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E)
-Rectangle (sides W1,500.00 H1.00 D0.00)
Casing Points
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(uaft) Name
(in)
(in)
14,375.00
6,162.64 23/8"
2.375
3.000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
12,825.00
6,202.80
2,562.10
-9,972.76
TIP/KOP
12,895.00
6,204.00
2,558.87
-10,041.80
Start 45 dis
13,035.00
6,189.94
2,460.69
-10,130.49
End 45 dis, Start 7 dis
13,185.00
6,182.98
2,311.72
-10,144.53
4
13,320.00
6,180.98
2,177.28
-10,134.18
5
13,520.00
6,184.85
1,977.94
-10,127.22
6
13,745.00
6,188.16
1,759.23
-10,176.84
7
14,200.00
6,174.20
1,398.06
-10,443.50
8
14,375.00
6,162.64
1,277.41
-10,569.28
Planned TD at 14375.00
4/3/2017 2:58.53PM Page 5 COMPASS 5000.1 Build 74
Baker Hughes INTEQ FICH
ConocoPhillips Travelling Cylinder Report BAKER
HUGHES
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Reference Site:
Kuparuk 3M Pad
Site Error:
0.00 usft
Reference Well:
3M-27
Well Error:
0.00 usft
Reference Wellbore
3M-27AL3
Reference Design:
3M-27AL3_wp02
Local Co-ordinate Reference:
TVD Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 3M-27
3M-27 @ 68.00usft (3M-27)
3M-27 @ 68.00usft (3M-27)
True
Minimum Curvature
1.00 sigma
OAKEDMP2
Offset Datum
Reference
3M-27AL3_wp02
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
To
Interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
Depth Range:
12,825.00 to 14,375+00usft Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum center -center distance of 1,630.70 usft Error Surface:
Elliptical Conic
Survey Tool Program
Date 3/30/2017
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
265.00
12,692.45 3M-27 (3M-27)
MWD
MWD -Standard
12,692.45
12,825.00 3M-27A_wp01 (3M -27A)
MWD
MWD -Standard
12,825.00
14,375.00 3M-27AL3_wp02(3M-27AL3)
MWD
MWD -Standard
Casing Points
Measured Vertical Casing Hole
Depth Depth Diameter Diameter
(usft) (usft) Name
14,375.00 6,230.64 2 3/8" 2-3/8 3
Summary
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
Kuparuk 3M Pad
3M-09 - 3M-09 - 3M-09
Out of range
3M-10 - 3M-10 - 3M-10
Out of range
3M-11 -3M-11 -3M-11
Out of range
3M-12 - 3M-12 - 310-12
Out of range
3M-19 - 3M-19 - 3M-19
Out of range
314-23 - 3M-23 - 3M-23
Out of range
3M-24 - 3M-24 - 3M-24
Out of range
3M-24 - 314-241-1 - 310-241-1
Out of range
310-24-310-2411-01 -3M-2411-01
Out of range
314-24 - 310-2411-01 PB1 - 310-2411-01 PB1
Out of range
3M-24 - 3M-2411-02 - 3M-2411-02
Out of range
314-24 - 310-2411-03 - 3M-2411-03
Out of range
3M-24 - 3M -24L1 PB1 - 3M -24L1 PB1
Out of range
310-24 - 3M -24L1 PB2 - 3M -24L1 PB2
Out of range
3M-24 - 3M -24L7 P133 - 3M -24L7 PB3
Out of range
3M -27 -3M -27-3M-27
12,829.52
12,850.00
43.62
9.20
41.06
Pass - Major Risk
3M-27-3M-27A-3M-27A_wp01
12,825.00
12,825.00
0.00
0.57
-0.53
FAIL - Minor 1/10
3M-27-3M-27AL1-3M-27A11_wp01
12,825.00
12,825.00
0.00
0.57
-0.53
FAIL - Minor 1/10
3M-27-3M-27AL2-3M-27AL2_wp02
12,825.00
12,825.00
0.00
0.57
-0.53
FAIL - Minor 1/10
310-27-3M-27AL2-01-3M-27AL2-01_wp01
12,825.00
12,825.00
0.00
0.57
-0.53
FAIL - Minor 1/10
310-27-3M-27AL4-3M-27AL4_wp00
12,825.00
12,825.00
0.00
1.05
-0.29
FAIL - Minor 1/10
3M-27-3M-27AL4-01-3M-27AL4-01 wp00
12,825.00
12,825.00
0.00
1.05
-0.29
FAIL - Minor 1/10
310-27-310-27AL4-02-3M-27AL4-02_wp00
12,825.00
12,825.00
0.00
1.05
-0.29
FAIL - Minor 1/10
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
313012017 4:48:08PM Page 2 COMPASS 5000.1 Build 74
ConocoPhillips
Ifs
6400
6000-
5600-
5200,
4800
4400
24000
0
53600
3200-
0
r✓2800
2400
0
O
t4 2000
1600
1200-
800
WO 111.
BAKER
HUGHES
I......■■■■■■■......
aamsnamnw Nun
WELLBORE DETAILS: 3M-2]AL3
ggFEREticE wPogMATION
Project: Kuparuk River Unit
3M-27
Mepnetic Nunn: 29•
+N/ -S +E/ -W
Site: Kuparuk 3M Pad
Easling
u.aKen neu
Parent Wellbore: 3M -27A
ceadroN(NA1 geMena: wel 3-Rl,I-Nma
Well: 3M-27
sreg4rc nsaam
Te on M0: 12825.00
vxlrel MDl geMe wean_Leea
WBllbare: 3M-27AL3
Inc
Diq k� Be.W'
TVDSS
Sallm IYS) Rdumee: Sbl-ry.WN, O.OBE)
Plan: 3M-27ALbwp02(3M.2713M-27AL3)
TFace
umec acct. m�T
Annotation
w+eew,m Drew q.Mersa: >uxrMaenoien11M2I)
80.95
280.92
6202.80
2562.10 -9972.76
Caogetion lMOpB: 1Nnmum CurveWre
Ifs
6400
6000-
5600-
5200,
4800
4400
24000
0
53600
3200-
0
r✓2800
2400
0
O
t4 2000
1600
1200-
800
WO 111.
BAKER
HUGHES
I......■■■■■■■......
WELL
DETAILS:
3M-27
+N/ -S +E/ -W
Northing
Easling
Latitude
Longitude
0.00 0.00
6016606.24
506294.30
70e 27' 23.753 N 149° 56'55.073 W
Sec MD
Inc
Azi
TVDSS
+N/ -S +E/ -W
Dleg
TFace
VSect
Annotation
1 12825.00
80.95
280.92
6202.80
2562.10 -9972.76
0.00
0.00
1003.30
TIP/KOP
212895.00
97.12
253.79
6204.00
2558.87-10041.80
45.00
300.00
1029.95
Start 45 dls
3 13035.00
93.22
190.61
6189.94
2460.69 -10130.49
45.00
270.00
1152.54
End 45 cls, Start 7 dis
413185.00
92.08
180.16
6182.98
2311.72-10144.53
7.00
264.00
1297.33
4
5 13320.00
89.62
171.04
6180.98
2177.28-10134.18
7.00
255.00
1420A2
5
6 13520.00
88.18
184.97
6184.85
1977.94-10127.22
7.00
96.00
1605.06
6
713745.00
90.14
200.60
6188.16
1759.23-10176.84
7.00
83.00
1827.55
7
8 14200.00
93.28
232.31
6174.20
1398.06-10443.50
7.00
84.00
2258.14
8
9 14375.00
94.27
220.07
6162.64
1277.41-10569.28
7.00
275.00
2414.53
Planned TD at 14375.00
Ifs
6400
6000-
5600-
5200,
4800
4400
24000
0
53600
3200-
0
r✓2800
2400
0
O
t4 2000
1600
1200-
800
WO 111.
BAKER
HUGHES
I......■■■■■■■......
I■■■�����F10',
■■■■.no
NOW
11111111111111111E1111E111..11---�-1111E111111�
-140D0-13600-13200-12800.12400-12D00.11600-11200-10800-1040D-10000-9600 -9200 -8800 -8400 -8000 -7600 -7260 -6800
Mean
Vertical Section at 200.000 (45 usft/in)
TRANSMITTAL LETTER CHECKLIST
WELL NAME: KA (A- 3M - � N
PTD: ),I? -C)57
/Development Service _Exploratory Stratigraphic Test Non -Conventional
FIELD: K4�Y./t,lc SIV POOL: l�ltQali K YtIVF,r Kik �Vut ! ���
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. al7-OS 3 API No. 50-�- as 6V -D/ -9Q.
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-_-
from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2XB) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHEC
PTD#:2170570 Compan
Appr Date
PKB 4/13/2017
Engineering
Appr Date
VTL 4/21/2017
Geology
Appr Date
PKB 4/13/2017
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
ALASKA_.IN_C
Initial Class
Permit fee attached _ _ _
NA
Lease number appropriate. _ _
Yes
Unique well name and number
Yes
Well located in a. defined. pool. _ _ _
Yes
Well located proper distance from drilling unit boundary
Yes
Well located proper distance from other wells
Yes
Sufficient acreage available in drilling unit
Yes
If. deviated, is wellbore plat included
Yes
Operator only affected party..
Yes
Operator has appropriate bond in force
Yes
Permit can be issued without conservation order.
Yes
Permit can be issued without administrative approval
Yes
Can permit be approved before 15 -day wait
Yes
Well located within area and strata authorized by Injection Order # (put 10# in comments). (For
NA
All wells. within 1/4. mile area of review identified (For service well only)
NA
Pre -produced injector: duration of preproduction less than 3 months. (For service well only)
NA
Nonconven, gas conforms to AS31.05.0300A.A),0.2.A-D) _ _
NA
Conductor string. provided. _ _ _ _
NA
Surface casing. protects all known USDWs _
NA
CMT vol adequate to circulate on conductor & surf csg
NA
CMT vol adequate. to tie-in long string to. surf csg
NA
CMT will cover all known productive horizons
No
Casing designs adequate for C, T, B & permafrost.
Yes
Adequate tankage or reserve pit
Yes
If. a. re -drill, has a 10-403 for abandonment been approved _
NA
Adequate wellbore separation proposed
Yes
If diverter required, does it meet regulations.
NA
Drilling fluid program schematic & equip list adequate
Yes
BOPEs,.do they meet regulation _
Yes
BOPE. press rating appropriate; test to (put psig in comments)
Yes
Choke. manifold complies w/API RP -53 (May 84) _ _
Yes
Work will occur without operation shutdown _ _ _
Yes
Is presence of H2S gas probable
Yes
Mechanical. condition of wells within AOR verified (For service well only)
NA
Permit can be issued w/o hydrogen. sulfide measures
No
Data presented on potential overpressure zones
Yes
Seismic. analysis of shallow gas. zones
NA
Seabed condition survey (if off -shore)
NA
Contact name/phone for weekly progress reports [exploratory only]
NA
__. Well Name: KUPAR_UK RIV UNIT_3M-27AL3 Program DEV_ - _ _ Well bore seg
DEVI-PEND GeoArea 00 Unit 11160 _ _ On/Off Shore On Annular Dispo
ADL0025523, Surf Loc; ADL0025522, Portion of Well; ADL0355032, Top Prod Intem & TD.
KRU 3M-27AL3_
KUPARUK RIVER,. KUPARUK.RIV OIL. -.490100,_ governed by Conservation. Order No, 432D. _
CO 432D contains no spacing restrictions with respect to drilling unit boundaries.
CO 432D has no intefwell spacing. restrictions,
Wellbore. will be more than 500' from an external property line where ownership or landownership changes.
Conductor set in KRU 3M-27
Surface casing set in 3M-27
Surface casing set and fully cemented
Productive. interval will be completed with slotted liner
Rig has steel tanks; all waste to approved disposal wells.
Anti -collision analysis complete; no major risk failures
Max formation pressure is 4305 psig(13.4 ppg_EMW ); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD
MPSP is 3684 psig; will test BOPs to 4200 psig
H2S measures required
Wells. on 3M -Pad are H2S-bearing. H2S measures required.
Max. potential_ reservoir pressure is 13.4 ppg. EMW; will be drilled using 8.6 ping mud and MPD technique.
Onshore development lateral to be drilled
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Co ' sinner Date
L{ ]ZS l tq
J