Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-057DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170570 Well Name/No. KUPARUK RIV UNIT 3M-27AL3 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-22637-63-00 MD 14427 TVD 6232 Completion Date 9/23/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION ✓ Mud Log Samples No Directional Survey Yes DATA INFORMATION Types Electric or Other Logs Run: GR/Res (data taken from Logs Portion of Master Well Data Maint) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 28660 Digital Data 12580 14427 10/13/2017 Electronic Data Set, Filename: 3M-27AL3 GAMMA RES.Ias ED C 28660 Digital Data 10/13/2017 Electronic File: 3H-27AL3 21VID Final.cgrr- ED C 28660 Digital Data 10/13/2017 Electronic File: 3H-27AL3 SMD Final.cgrm ED C 28660 Digital Data 10/13/2017 Electronic File; 3H-27AL3 5TVDSS Final.cgm , ED C 28660 Digital Data 10/13/2017 Electronic File: 3H-27AL3 21VID Final.pdf . ED C 28660 Digital Data 10/13/2017 Electronic File: 3H-27AL3 51VID Final.pdf , ED C 28660 Digital Data - 10/13/2017 Electronic File: 3H-27AL3 5TVDSS Final.pdf - ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3 EOW - NAD27.pdf, ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3 EOW - NAD27.txt, ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3 Final Surveys TD- 14427.csv ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3 Final Surveys TD. 14427.xlsx ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3 Survey Listing.txt - ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3 Surveys.txt . ED C 28660 Digital Data 10/13/2017 Electronic File: 3M- 27AL3_25 tapescan_BHI_CTK.txt ED C 28660 Digital Data 10/13/2017 Electronic File: 3M- 27AL3_5_tapescan_BHI_CTK.txt . ED C 28660 Digital Data 10/13/2017 Electronic File: 3M-27AL3_output.tap , ED C 28660 Digital Data - 10/13/2017 Electronic File: 3H-27AL3 21VID Final.tif , ED C 28660 Digital Data 1 011 3/2 01 7 Electronic File: 3H-27AL3 51VID Final.tif , AOGCC Page 1 of 2 - Thursday, December 28, 2017 DATA SUBMITTAL COMPLIANCE REPORT 12/28/2017 Permit to Drill 2170570 Well Name/No. KUPARUK RIV UNIT 3M-27AL3 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029-22637-63-00 MD 14427 TVD 6232 Completion Date 9/23/2017 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 28660 Digital Data 10/13/2017 Electronic File: 31­1-27AL3 5TVDSS Final.tif- Log C 28660 Log Header Scans 0 0 2170570 KUPARUK RIV UNIT 3M-27AL3 LOG HEADERS ED C 28685 Digital Data 10/16/2017 Electronic File: 3M-27AL3 EOW - NA027.pdf' ED C 28685 Digital Data 10/16/2017 Electronic File: 3M-27AL3 EOW - NAD27.txt Log C 28685 Log Header Scans 0 0 2170570 KUPARUK RIV UNIT 3M-27AL3 LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED/�1 Core Chips Y /SIA ) Completion Report �X Directional / Inclination Data (tY, Production Test Informatioryo NA Mechanical Integrity Test Information YY Geologic Markers/Tops 1r / Daily Operations Summary COMPLIANCE HISTORY Completion Date: 9/23/2017 Release Date: 4/25/2017 Description Comments: Compliance Reviewed By: Date Comments Mud Logs, Image Files, Digital Data Y V Core Chips Y /SIA ) Composite Logs, Image, Data Files,9 Core Photographs Y / A/ Cuttings Samples Y / No Laboratory Analyses Y/A Date: AOGCC Page of 2 Thursday, December 28, 2017 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMIISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil ❑✓ Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG[] WDSPL ❑ No. of Completions: 1b. Well Class: Development ❑✓ Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 9/23/2017 14. Permit to Drill Number/ Sundry: 217-057 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 9/21/2017 15. API Number: 50-029-22637.63-00 4a. Location of Well (Governmental Section): Surface: 892' FNL, 1574' FEL, Sec 25, T13N, R8E, UM Top of Productive Interval: 3620' FNL, 983' FEL, Sec 22, T1 3N, R8E, UM Total Depth: 4966' FNL, 1504' FEL, Sec 22, T1 3N, R8E, UM 8. Date TO Reached: 9/22/2017 16. Well Name and Number: KRU 3M-27AL3 - 9. Ref Elevations: KB: 68 GL: 27 BF: 17. Field / Pool(s): Kuparuk River Field/Kuparuk Oil Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ADL 25523, ADL 355032, ADL 25522' 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 506294 y- 6016605 Zone- 4 TPI: x- 496323 y- 6019156 Zone- 4 Total Depth: x- 495804 y- 6017811 Zone- 4 11. Total Depth MD/TVD: 1442776232' 19, DNR Approval Number. 931813000 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: 1795/1725 5. Directional or Inclination Survey: Yes ✓ (attached) No Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: 1281776259' 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeler, formation tester, temperature, cement evaluall �ginQcf locator, jeDry, and perforation record. Acronyms may be used. Attach a separate page if necessary fOi E�/.-� E VE GR/Res OCT 2 0 2017 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 16" 62.58 H40 Surf 121' Surf 121' 24" 200 CF 9.625" 40 L-80 Surf 5996' Surf 3465' 1300 sx AS III Lead, 690 sx 12.25" Class G Tail 7" 26 L-80 Surf 13006' Surf 6432' 8.5" 200 sx Class G 2-3/8" 4.7 L-80 12556' 14427' 6094' 6232' 3" Slotted Liner 24. Open to production or injection? Yes ❑✓ No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): 12556'-14427' MD 16094'-6232' TVD Slotted Liner / 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3-1/2" 12598' 12498 MD/6052 TVD 12571 MD/6105 TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes No -7 - o ✓Per 20 AAC 25.283 (i)(2) attach electronic and printed information Per DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 912412017 Method of Operation (Flowing, gas lift, etc.): GAS LIFT Date of Test: 10/212017 Hours Tested: 6.8 Production for Test Period Oil -Bbl: 1070 Gas -MCF: 594 Water -Bbl: 521 Choke Size: 173 Gas -Oil Ratio: 555 Flow Tubing Press. 263 Casing Press: 1315 Calculated 24 -Hour Rate --I� Oil -Bbl: 3778 Gas -MCF: 2098 Water -Bbl: 1838 Oil Gravity - API (torr): 20 Form 10407 Revised 5/2017 V -M /fl/mss/� CONTINUED ON PAGE 2RBS AS OCTi 1� 211�Submit ORIGINAL only -Pyi 101* � rol,-rj G 28. CORE DATA Conventional Core(s): Yes ❑ No ❑� Sidewall Cores: Yes ❑ No ❑� If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presenceof oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑Z If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1795 1725 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 12817 6259 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kupark A TD 14427 6232 (Kuparuk A Sand) Formation at total depth: Kuparuk A Sand 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematics Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. .11 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: J. Ohlinger Contact Name: Keith Herring Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herring@cop.com Authorized Contact Phone: 2634321 Signature: Date: /e 19, /% INSTRUCTIONS General: This forth and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3M-27 Final CTD Schematic 1 6" 62# H40 shoe @ 121' MD 9-518" 36# L-80 shoe @ 5996' MD C -sand perfs 12,696' -12,708' MD 12,724' -12,744' MD KOP @ 12,712' MD A -sand parts 12,764'- 12,784' MD T' 26# L -8 M0 shoe @ 13,006' D 3-112" Carrico DS Landing Nipple @ 495' RKB (ID = 2.875") 3-112" 9.3# J-55 EUE 8rd Tubing to surface 3-12" Carrico, MMG gas lift mandrel @ 3543'.6918!, 9762', 11,666'.12,378- RKB Baker CMU Sliding Sleeve @ 12,433' RKB (2.813" ID X -profile) Baker 80-40 PER @ 12,485' RKB (4.00" ID) Baker FHL packer @ 12,498' RKB (2.90" ID) X Nipple @ 12,515' RKB (2.813 ID) (12504' PDC) Baker Po -Boy Overshot @ 12,533' RKB (12522' PDC) Camco W Nipple @ 12,550' RKB (2.812" ID) (12539 PDC) Baker PER @ 12,558' RKB (3.00" ID) Baker FHL packer @ 12,571' RKB (3.0" ID) (12560' PDC) 3-12" Camco D nipple @ 12,588' RKB (12577' PDC) (Milled out to 2.80" ID) 3-12" tubing tail @ 12,598' RKB (12587' PDC) AL3 TD =14427' MD slatted liner wf deployment sleeve 12556' MD, BOL=14427' MD =water soluble tracer pups oil soluble tracer pups 3M-27AU4H TO =15380' MD 2J 8" ebbed liner w/anchored aWminum billet TOL =1281T MD, BOL= 15380' MD 01 Tmcer at 152W MD (SN: T-740) Water Tracer et 15273' MO (SN: -5121 3W27A TO=14094' MO 2-38" sbtkd liner w/ qummum beat TOL= 13232' MD, BOL= 14994' MD Oil Tracer at 14644' MD (SN:T-16517) Water Tracer at 14637' MD (SN: T540) 13MT MD, BOL =154W ML iar at 15208' MD (SN: TAW Tracer at 1520T MD (SN: T-9 AL2PB1 TD= 14280' MD red Billet =13416 MD red Bilet =13480' MD (failed) >Lt TO= 14882' MD slotted liner wl aleminum beat 13150' MD, SOL =14882' MD Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log o Stan Tme End Time Dur (hr) Phase Op Code Activity Code Tine P -T -X Operation Stan Depth (WS) End Depth (ftKB) 8/5/2017 8/5/2017 3.00 MIRU MOVE MOB P Trucks on location, PJSM w/crews, 0.0 0.0 18:00 21:00 follow pre -move check list, pull pit module away from ddling Sub, pull drilling Sub off of well, install jeeps, load shop onto 12' wide trailer. 8/5/2017 8/5/2017 2.25 MIRU MOVE MOB P Start moving to 3M -pad crossing over 0.0 0.0 21:00 23:15 rig mats 8/5/2017 8/6/2017 0.75 MIRU MOVE MOB P On 3M -pad, remove jeeps, prep well 0.0 0.0 23:15 00:00 1 for rig. 8/6/2017 8/6/2017 4.00 MIRU MOVE MOB P Spot modules over well 27, retrieve 0.0 0.0 00:00 04:00 shop and halfway house. 8/6/2017 8/6/2017 2.00 MIRU WHDBOP RURD P Follow post move check Isit, setting 0.0 0.0 04:00 06:00 stairs, spotting in dumpsters, hooking up PUTZ 8/6/2017 8/6/2017 2.50 MIRU WHDBOP NUND P Nipple up BOPE's, fuesable istalled, 0.0 0.0 06:00 08:30 called CPF3 Board, COMMS up after 07:00, prep for BOP test, working on MP #2 replacing pulsation dampener 8/6/2017 8/6/2017 1.50 MIRU WHDBOP NUND P PJSM, fluid pack lines, BOP shell test, 0.0 0.0 08:30 10:00 C/O leaking O-ring riser, repeat shell test to 4200 psi, passed. •" Rig Accepted 09:00 hour "• 8/6/2017 8/6/2017 9.00 MIRU WHDBOP BOPE P Begin BOPE test, witness waived by 0.0 0.0 10:00 19:00 Chuck Scheve, lest 10, greased B4 R 8, retested, found bleeder 4leaking since beginning of test (not part of WC, will need replaces), greased R3 was faillpass. Test IRV iron, leaking near pressure bulkhead, LOTO reel to troubleshoot IR iron 8/6/2017 8/6/2017 1.50 SLOT WELLPR MILL P PT PDL's and tiger tank line, sim-ops, 0.0 0.0 19:00 20:30 remove bulkhead, repair failed o -ring, re -install bulkhead. 6/6/2017 8/6/2017 2.00 SLOT WELLPR MILL P Valve crew on locaiton, load 0.0 0.0 20:30 22:30 equipment, MU extentions, PT lubricator, pull BPV 8/6/2017 8/6/2017 1.00 SLOT WELLPR MILL P Retest and chart inner reel iron, good 0.0 0.0 22:30 23:30 test 8/6/2017 8/7/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU BHA# 1 0.0 62.4 23:30 00:00 8/7/2017 8/7/2017 0.75 SLOT WELLPR MILL T Finish MU milling BHA# 1, with turned 62.4 62.4 00:00 00:45 down bi-center bit 2.98", surface test tools, stab INJH 8/7/2017 8/712017 1.75 SLOT WELLPR MILL T RIH, taking freeze protect returns out 62.4 9,098.0 00:45 02:30 side to tiget tank. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Set down 2k CTSW, PUH circulate 9,098.0 7,940.0 02:30 03:30 milling fluid around, re -boot BHI computers, PUH for Tie In. 8/7/2017 817/2017 0.55 SLOT WELLPR MILL T Log formation for tie in/depth control 7,940.0 8,042.0 03:30 04:03 plus 18.0' 8/7/2017 8/7/2017 0.20 SLOT WELLPR MILL T RIH, 8,042.0 9,030.0 04:03 04:15 8/7/2017 8/7/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 2.0' 9,030.0 9,068.0 04:15 04:30 1 - Page 1151 ReportPrinted: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time tog start Depth StartTime End Time our (hr) Phase Op Code Activity Cade Time P -T -X Operation (W) End Depth (WS) 8/7/2017 817/2017 3.00 SLOT WELLPR MILL T Dry Tag TOC @ 9117', PUW 33.5 k. 9,068.0 9,117.0 04:30 07:30 Bring pump up 1.5 bpm at 2315 psi FS, BHP 2389, WHIP 0, IA 0. OA 338. Mulitple stalls trying to get a pattern started. Mixed and pumped 50 bbl pill w/ 2.5% Safe Lube. 8/7/2017 8/7/2017 1.00 SLOT WELLPR MILL T Safe lube at bit, 9116.95', 1.8 bpm, 9,117.0 9,117.0 07:30 08:30 2926 psi CP, (2650 psi FS, 300 psi motor work), First time able to stay on it w/out stalling, made 1 foot on Autodriller w/ 0.2K WOB, to 9118', increased WOB after 1 ft and stalled. PU 33K 8/7/2017 817/2017 2.80 SLOT WELLPR MILL T Unable to get mill started. Confer with 9,117.0 9,119.0 08:30 11:18 Town, tried recommended break-in procedure at low pump rate, 1.2 bpm. Tried holding in motor stall longer (per town), Spud in multiple times at 15 FPM, pumps on/off. 8/7/2017 8/712017 3.50 SLOT WELLPR MILL T Send Pill w/ 0.5 ppb beads, open 9,119.0 9,122.9 11:18 14:48 EDC, circulate down closer to bit, close EDC. After multiple stalls, able to stay on it at 1.8 bpm, 2980 CP, 80 to 100 psi motor work, 0.2K WOB, Fend second 25 bbl bead pill 8/7/2017 8/7/2017 1.70 SLOT WELLPR MILL T Decision from town to POOH for 9,122.9 62.4 14:48 16:30 different MHA 8/7/2017 8/712017 1.50 SLOT WELLPR MILL T At surface, OWWFF, hold PJSM, lay 0.0 62.3 16:30 18:00 down HYC 2.98" bi-center bit and Baker motor, PU HYC 2.73" SD408 Non bi-center PDC bit and new motor 8/7/2017 8/7/2017 1.80 SLOT WELLPR MILL T RIH 62.3 9,060.0 18:00 19:48 8/7/2017 8/7/2017 0.30 SLOT WELLPR MILL T Log lie in from 9000' to 9060, continue 9,050.0 9,124.0 19:48 20:06 RIH 8/7/2017 8/7/2017 2.00 SLOT WELLPR MILL T Dry tag at 9124, PU 33K. Establish 9,124.0 9,141.0 20:06 22:06 FS parameters at 1.2 bpm, 1775 psi CP, 0 WHIP, 2356 psi BHP, 164 psi dP. Stall 2X creeping in at 8 FPH. PU, establish FS parameters at 1.5 bpm, 2306 psi CP, 0 WHP, 2400 psi BHP, 221 psi dP, able to gel WOB wlout stall, mill cement 8/7/2017 8/812017 1.90 SLOT WELLPR MILL T OBM, 1.78 bpm at 2,938 psi FS, BHP 9,141.0 9,168.0 22:06 00:00 1 2,485, WHIP 0, IA 0, OA 502 8/8/2017 8/812017 2.30 SLOT WELLPR MILL T OBM, 1.79 bpm at 3,025 psi, BHP 9,168.0 9,195.0 00:00 02:18 2,491. WHIP 0, IA 0, OA 508, CTSW=5.6 k, DHWOB=1.7-2.0 k, ROP 30 fph 8/6/2017 8/8/2017 0.25 SLOT WELLPR MILL T Annular and bore pressure increased, 9,195.0 8,700.0 02:18 02:33 PUH 34 k, pulled 50 k at 9,155'. continued wiper above cement. 8/8/2017 81812017 3.75 SLOT WELLPR MILL T RBIH, setting down at 9,167', 8,700.0 9,195.0 02:33 06:18 9,162',9,158', 9,144', work back to bottom (16 stalls since midnight), 1.75 bpm at 2,894 psi FS, BHP 2,572, WHIP 0, IA 0, OA 527 Page 2151 Report Printed: 9127120171 .F Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start oeptlr De Sm Time End Time Dur (hr) Phase Op code Activity Code time P-T-X operation (n End Depth (ttl(a) 8/8/2017 8/8/2017 2.20 SLOT WELLPR MILL T BOBM, 1.83 bpm at 3,200 psi, BHP 9,195.0 9,212.0 06:18 08:30 2,635, WHIP 0, IA 0, OA 531, CTSW=6 k, DHWOB=1.8 k, ROP 22-30 fph. Pump 5x5 sweeps, for hole cleaning. 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T PUH, PUW 51 k, DHWOB -12 k, Pull 9,212.0 62.3 08:30 10:00 free, continue PUH, open EDC, POOH pumping 2.2 bpm at 2,806 psi, chasing sweep to surface. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 62.3 62.3 10:00 10:30 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T LD Milling BHA# 2 62.3 0.0 10:30 11:00 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T WO Weatherford tools to arrive 0.0 0.0 11:00 11:30 location. 8/8/2017 8/8/2017 0.50 SLOT WELLPR MILL T PJSM, PU/MU Reaves Underreamer, 0.0 83.7 11:30 12:00 WFT Motor, Dual Acting Jars, 2.73" Stabilizer over dead well 8/8/2017 8/8/2017 1.50 SLOT WELLPR MILL T Tag up, reset counters. RIH, circulate 63.7 9,050.0 12:00 13:30 minimum rate. 8/8/2017 8/8/2017 0.35 SLOT WELLPR MILL T Log formation correction plus 12.0', 9,050.0 9,091.0 13:30 13:51 PUW 36 k 8/8/2017 8/8/2017 0.40 SLOT WELLPR MILL T PUH to underream, Gose EDC 9,091.0 8,000.0 13:51 14:15 8/8/2017 8/8/2017 4.00 SLOT WELLPR MILL T Bring pump up to 1.6 bpm at 3,422 8,000.0 9,141.0 14:15 18:15 psi, BHP 2,225, WHIP 0. IA 0, OA 429, RIH at 20 fpm, CTSW=11 k, DHWOB=O 8/6/2017 8/8/2017 0.90 SLOT WELLPR MILL T Motor work increase, stalled, PUH, 9,141.0 9,075.0 18:15 19:09 difficutly working back down, pump 5x5 sweeps, circulate bottoms up with cement chunks over the shakers, caliper indicates tubing collar at 9140'. 8/8/2017 8/8/2017 0.20 SLOT WELLPR MILL T RBIH to continue under-reaming at 9,075.0 9,141.0 19:09 1921 9141'. 8/8/2017 8/8/2017 2.10 SLOT WELLPR MILL T Conitinue under-reaming from 9141', 9,141.0 9,212.0 19:21 21:27 stalled at 9149', PUW = 39K, continue reaming to 9190', PUW = 36K', increased motor work observed at 9209', stall, PUW = 42K from 9209', RBIH & again observe increased motor work at 9209', slow and let mill off, again let mill off at 9110', ream to end of pilot-hole at 9212' 8/8/2017 8/8/2017 1.00 SLOT WELLPR MILL T Continue with under-reamer past end 9,212.01 9,216.0 21:27 22:27 of pilot-hole, pumping 1.8 bpm, CWT = 7K, WOB = .3K, FS = 1285 psi, slow reaming at -2'-4' fph, confer with town, decision made to POOH & PU junk mill. 8/8/2017 8/9/2017 1.55 SLOT WELLPR MILL T Open EDC, begin POOH to PU 2.80" 9,216.0 2,000.0 22:27 00:00 junk mill, pumping 2.2 bpm 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Continue POOH, tag up, space out 2,000.0 84.0 00:00 00:30 8/9/2017 8/9/2017 0.90 SLOT WELLPR MILL T PJSM, flow-check well, LD BHA #3 84.0 0.0 00:30 01:24 over dead well, under-reamer came out looking good, gauging at 2.90" Page 3151 ReportPrinted: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Star)Time End Time Der (hr) Phase Op cafe Activity Corte Time P -T -X Operation (ftKB) End Deptit(nKB) 8/9/2017 8/9/2017 0.60 SLOT WELLPR MILL T PJSM, PU BHA #4 (0° AKO X-Treme 0.0 80.0 01:24 02:00 motor, Baker G -Force up/down jars, 2.80" five -bladed junk -mill), slide in cart, slab on, check pack -offs, tag up 8/9/2017 8/9/2017 1.70 SLOT WELLPR MILL T RIH with BHA #4 80.0 9,040.0 02:00 03:42 8/9/2017 8/9/2017 0.10 SLOT WELLPR MILL T Tie into formation for a +11.5' 9,040.0 9,078.0 0342 03:48 correction, close EDC 8/9/2017 8/9/2017 0.70 SLOT WELLPR MILL T Continue RIH, set down twice at 9,078.0 9,216.0 03:48 04:30 9144' (min rate & pumps off), PUW = 40K, bring up pumps to 1.8 bpm, FS = 358 psi, stall at 9142', PUW = 40K, attempt milling at -12 fph and get by, - drop rate & continue RIH to 9216', PUH, bring up rate 8/9/2017 8/9/2017 2.00 SLOT WELLPR MILL T Milling at 9216, rale in = 1.8 bpm, FS 9,216.0 9,270.0 04:30 06:30 = 345 psi, CWT = 10K, BHP = 2677 psi, WOB = .51K, Stall at 9270'. Pump 5 x 5 sweeps. 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole to 9155, PUW = 36K, 9,270.0 9,155.0 06:30 07:00 Caught sample. 8/9/2017 819/2017 0.50 SLOT WELLPR MILL T Wiper back in hole. RIH = 8K 9,155.0 9,270.0 07:00 07:30 8/9/2017 8/9/2017 2.00 SLOT WELLPR MILL T BOBM, Rate In/Out = 1.8 bpm, FS = 9,270.0 9,336.0 07:30 09:30 355 psi, CWT = 8K, BHP = 2665 psi, WOB = 0.5-2k, ROP=30-70 fph 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper up hole, PUW 40 k 9,336.0 9,160.0 09:30 10:00 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T Wiper back in hole, RIW 7 k 9,160.0 9,336.0 10:00 10:30 8/9/2017 8/9/2017 0.50 SLOT WELLPR MILL T BOBM, 1.82 bpm at 3,600 psi, BHP 9,336.0 9,350.0 10:30 11:00 2,749, WHIP 0, IA 0, OA 577, 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper up hole PUW 38 k 9,350.0 9,159.0 11:00 11:15 8/9/2017 8/9/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 5 k 9,159.0 9,350.0 11:15 11:30 8/9/2017 819/2017 3.25 SLOT WELLPR MILL T BOBM, 1.79 bpm at 3,830 psi, BHP 9,350.0 9,357.0 11:30 14:45 2,503, WHIP 0, IA 0, OA 595, trouble keeping steady DHWOB, pump 5x5 sweep 8/9/2017 8/912017 2.25 SLOT WELLPR MILL T POOH, to check inspect BHA, filling 9,357.0 80.0 14:45 17:00 out trip sheet every 1000' 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T PJSM, flow check, LD BHA #4 over a 0.0 75.0 17:00 18:24 dead well, PU BHA #5 (G -Force up/down jar, agitator, X-Treme motor, 5 blade junk mill, 2.81"), surface test agitator, good 8/9/2017 8/9/2017 1.40 SLOT WELLPR MILL T RIH with BHA#5 75.0 9,040.0 18:24 19:48 8/9/2017 8/9/2017 0.30 SLOT WELLPR MILL T Log formation for+11' correction 9,040.0 9,080.0 19:48 20:06 8/9/2017 8/9/2017 0.20 SLOT WELLPR MILL T Continue RIH 9,080.0 9,357.0 20:06 20:18 8/9/2017 8/9/2017 2.10 SLOT WELLPR MILL T OBM, pumping 1.8 bpm, annular= 9,357.0 9,410.0 20:18 22:24 2770, CWT = 9K, WOB = 1.81K, , pump 5x5 sweep, average ROP over interval = 25 fph Page 4151 Report Printed: 9 /2 712 01 7 Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth am Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (Iara) End Depth(W) 8/9/2017 8/9/2017 0.40 SLOT WELLPR MILL T Wiper -trip up to 9102', PUW = 35K, 9,410.0 9,410.0 22:24 22:48 RIW = 7.5K, no issues RIH past 9141' 8/9/2017 8/10/2017 1.20 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, CWT = 9,410.0 9,463.0 22:48 00:00 7.75K, WOB= 1.81K, BHP = 2780 psi, WOB dropped to OK from 9416'- 416'-9419', 9419',encounter green/incompetent cement beginning at 9434' (continued to midnight depth of 9463'), no WOB or motor work observed 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T Continue in green/incompetant 9,463.0 9,600.0 00:00 00:30 cement from 9463'to 9609, observe significant cement over shakers 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper up -hole to TOC, PUW = 36K 9,600.0 9,090.0 00:30 00:42 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper in-hole, RIW = 7K 9,090.0 9,600.0 00:42 00:54 8/10/2017 8/10/2017 1.00 SLOT WELLPR MILL T Continue in green cement from 9600', 9,600.0 9,814.0 00:54 01:54 continue to observe significant cement with soft tan material intermixed over shakers, Sulfuric acid (H2SO4) test on samples indicates cement, though non reactive with tan material, performing short WT's to evaluate hole loading, PUW= 36K -44K 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T 725' wiper trip up to 9090', PUW = 9,814.01 9,814.0 01:54 02:30 37K, RIW = 8.3K, pump 5x5 sweeps 8/10/2017 8/10/2017 1.50 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm, BHP = 9,814.0 9,866.0 02:30 04:00 2878 psi, FS = 869 psi, stall at 9817', PUW = 39K, CWT = 10K, WOB =.5K, encounter competent cement again at 9815', pump 5x5 sweep 8/10/2017 8/10/2017 0.50 SLOT WELLPR MILL T WT up -hole, PUW =32K 9,866.0 7,836.0 04:00 04:30 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T WT in-hole, tie into formation for = -5' 7,836.0 9,866.0 04:30 05:15 correction, RIW = 8K 8/10/2017 8/10/2017 3.00 SLOT WELLPR MILL T BOBM, 1.79 bpm at 4,269 psi, BHP 9,866.0 9,950.0 05:15 08:15 2,880, WHIP 0, IA 0, OA 606 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T Wiper up hole, PUW 38 k 9,950.0 9,700.0 08:15 08:30 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T Wiper back in hole, RIW 6.4 k 9,700.0 9,950.0 08:30 08:45 8/10/2017 8/1012017 0.50 SLOT WELLPR MILL T BOBM, 1.81 bpm at 4,245 psi, BHP 9,950.0 9,971.0 08:45 09:15 1 1 1 2,940, WHIP 0, IA 0, OA 606 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T Stall motor, unable to move pipe, Pull 9,971.0 9,971.0 09:15 09:30 65 k, pipe moving, short wiper up hole to 9,806'. 8/10/2017 8/10/2017 2.50 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,380 psi, BHP 9,971.0 10,015.0 09:30 12:00 3,050, WHIP 0, IA 0, OA 608 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, PUW 34 k, unable 10,015.0 10,015.0 12:00 12:45 to pump, seems motor is locked up, open EDC, pump 5x5 sweep, 8/10/2017 8/10/2017 1.50 SLOT WELLPR MILL T POOH, pump 2.3 bpm w/open EDC 10,015.0 74.8 12:45 14:15 4,230 psi, filling trip sheet every 1000' 8/10/2017 8/10/2017 0.25 SLOT WELLPR MILL T At surface, check well for flow, PJSM 74.8 74.8 14:15 14:30 Page 51511 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth start Time End Time Dw (hr) Phase Op Code Activity Code Time PJA Operation (R)(3) Erb Depth (f KB) 8/10/2017 8/1012017 0.50 SLOT WELLPR MILL T LD milling BHA# 5, inspect tools. 74.8 0.0 14:30 15:00 found BHI motor to be locked up, agitator checked out good. 8/10/2017 8/10/2017 0.75 SLOT WELLPR MILL T PU/MU Milling BHA# 6, w/new X- 0.0 74.6 15:00 15:45 Treme motor 8/10/2017 8/1012017 1.70 SLOT WELLPR MILL T RIH, pumping 0.30 bpm at 1138 psi, 74.6 9,050.0 15:45 17:27 filling trip sheet every 1000'. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Log formation correction of+10 9,050.0 9,082.0 17:27 17:39 8/10/2017 8/10/2017 0.55 SLOT WELLPR MILL T Continue RIH, RIW = 9K 9,082.0 10,015.0 17:39 18:12 8/1012017 8/10/2017 1.70 SLOT WELLPR MILL T OBM at 10,015', pumping 1.8 bpm, 10,015.0 10,075.0 18:12 19:54 CWT = 10K, WOB =1.5K, annular = 3004 psi, pumping sweeps to coincide with WT. 8/10/2017 8/10/2017 0.20 SLOT WELLPR MILL T Wiper trip (200'), PUW = 35K, RIW = 10,075.0 10,075.0 19:54 20:06 6K 8/10/2017 8/10/2017 1.80 SLOT WELLPR MILL T OBM at 10,070', pumping 1.8 bpm, FS 10,075.0 10,126.0 20:06 21:54 =948 psi, CWT=4.5K, WOB =1.1 K, annular = 3078 psi, 5x5 sweeps coming around. 8/10/2017 8/10/2017 0.60 SLOT WELLPR MILL T Stall at 10,126', shutdown pumps,. 10,126.0 10,117.0 21:54 22:30 PU, start pulling heavy, RBIH, became momentarily detained, bring up pumps, dip jumps up, shut down pumps, jar down twice, jar up 3 times, _ no success, attempt to bring up pumps, dip increased rapidly (stall condition at 1700 psi diff), shut down pumps, rate out begins to trickle, bring pumps back up, rate out returns, BHA is free, (note: saw DHWOB up to - 15.8K & 70K CWT) 8/10/2017 8/10/2017 1.00 SLOT WELLPR MILL T WT (up to 9295'), circulate bottoms 10,117.0 10,126.0 22:30 23:30 up, RIW = 6.5K 8/10/2017 8/11/2017 0.50 SLOT WELLPR MILL T OBM at 10,126', pumping 1.8 bpm, FS 10,126.0 10,138.0 23:30 00:00 = 945 psi, dp = 1042 psi, CWT = 4.6K, WOB = 1.5K, annular = 3110 psi 8/11/2017 8/11/2017 1.00 SLOT WELLPR MILL T Continue milling cement at 10,138' 10,138.0 10,165.0 00:00 01:00 pumping 1.8 bpm, CWT = 1.5K, WOB = 2K, annular = 3160 psi, WHP = 0 psi, FS = 945 psi, dip = 1061 psi, IA = 0 psi, OA = 631 psi, pump sweeps 8/11/2017 8/11/2017 0.40 SLOT WELLPR MILL T Sweeps come around, WT (500'), 10,165.0 10,165.0 01:00 01:24 PUW = 38K, RIW = 7K 8/11/2017 8/11/2017 1.60 SLOT WELLPR MILL T OBM at 10,165, pumping 1.8 bpm, FS 10,165.0 10,215.0 01:24 03:00 = 945 ps, CWT = 4.4K, WOB = 1.3K, annular = 3176 psi, pump sweeps timed for WT 6/11/2017 8/11/2017 0.30 SLOT WELLPR MILL T WT (200), PUW = 38K, RIW = 4K 10,215.0 10,215.0 03:00 03:18 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T OBM at 10,215' pumping 1.8 bpm, FS 10,215.0 10,270.0 03:18 05:18 = 940 psi, CWT = 2.5K, WOB = 1.9K, annular = 3215 psi, pump sweeps timed for WT 8/11/2017 8/1112017 0.45 SLOT WELLPR MILL T WT up 200', PUW =40 k, 10,270.0 10,270.0 05:18 05:45 Page 6151 Report Printed: 912712017 Operations Summary (with Timelog Oepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Thine log Start Depm Stan Thme End Time Dur (hr) Phase Op Cotle Arlivity Cone Time P -T -x Operation (MB) End DepN(flKa) 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, pumping 1.8 bpm FS =4126 10,270.0 10,319.0 05:45 07:45 psi, CTSW=O k, DHWOB=2.2 k, BHP 2,543, WHP 0, IA 0, OA 659 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Swap milling fluid, wiper up hole, 10,319.0 9,050.0 07:45 08:15 8/11/2017 8/11/2017 0.35 SLOT WELLPR MILL T Wipertrip back in hole, RIW 11.5 k 9,050.0 10,220.0 08:15 08:36 8/11/2017 8/11/2017 0.25 SLOT WELLPR MILL T Log formation for depth control 10,220.0 10,259.5 08:36 08:51 correction plus 6.5' 8/11/2017 8/11/2017 0.35 SLOT WELLPR MILL T Continue IH 10,259.5 10,319.0 08:51 09:12 8/11/2017 8/11/2017 1.95 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,535' psi FS, BHP 10,319.0 10,374.0 09:12 11:09 2,7050HP 0, IA 0. OA 644 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper up hole 500', PUW 36 k 10,374.0 10,374.0 11:09 11:39 8/11/2017 8/11/2017 1.40 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,560 psi, BHP. 10,374.0 10,404.0 11:39 13:03 2,795, WHIP 0, IA 0, OA 634 8/11/2017 8/11/2017 0.60 SLOT WELLPR MILL T Encountered green cement, RIH w/no 10,404.0 10,425.0 13:03 13:39 diff, pumping 1.77 bpm at 3,606 psi, set down 10,424' stall motor. 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000' 9,450',. PUW 38 10,425.0 10,425.0 13:39 14:09 k 8/11/2017 8/11/2017 0.50 SLOT WELLPR MILL T RIH trying to find bottom, 1.77 bpm at 10,425.0 10,433.0 14:09 14:39 3,581 psi, BHP 2,847, WHP 0, IA 0, OA 628, stall motor, PUW 43 k. *** 29' of green cement 8.75 ppg max 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T Bring pump back on line, RBIH, 1.8 10,433.0 10,475.0 14:39 16:39 bpm at 3,747 psi, BHP 2,871, IA 0, OA 623 8/1112017 8/11/2017 0.50 SLOT WELLPR MILL T Wipertrip up hole 1000'(9,475), PUW 10,475.0 10,475.0 16:39 17:09 42 k 8/11/2017 8/11/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 10,475', CWT= 10,475.0 10,525.0 17:09 19:09 6K, WOB = 2K, annular = 2965 psi, stall at 10,523', PUW = 45K, continue milling ahead to allow sweep to exit bit. 8/11/2017 8/11/2017 0.85 SLOT WELLPR MILL T WT (1000'), PUW =40K, RIW = 7K 10,525.0 10,525.0 19:09 20:00 8/11/2017 8/11/2017 2.30 SLOT WELLPR MILL T BOBM, 1.8 bpm, CWT = 7K, WOB = 10,525.0 10,575.0 20:00 22:18 1.7K, annular = 2946 psi, pump sweeps 8/11/2017 8/11/2017 1.30 SLOT WELLPR MILL T WT, (1000'), PUW = 43K, tie-in tor- 10,575.0 10,565.0 22:18 23:36 19' correction, RIW = 7K, puts new corrected depth at 10,555', tag bottom 10' deeper at 10,565', plan to check counter 8/11/2017 8/12/2017 0.40 SLOT WELLPR MILL T OBM, CWT =3.7K, WOB =1.9K, FS= 10,565.0 10,572.0 23:36 00:00 814 psi, annular = 3059 psi 8/12/2017 8/12/2017 3.30 SLOT WELLPR MILL T Continue milling from 10,572', 10,572.0 10,625.0 00:00 03:18 pumping 1.8 bpm, CWT = 4.7K, FS = 814 psi, WOB = 2K, annular = 3044 psi, pump sweeps, stall at 10,585', PUW = 45K, BHA wiper up to 10,485', stall at 10,612', PUW = 43K, prepping to build new milling system on rig, current system at -70K LSRV Page 7151 Report Printed: 912712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth StaM1Tme End Time Der (hr) Phase Op Code Activity Code Time P.T-X Opemtion (RIB) End Depth (flKB) 8/12/2017 8/12/2017 1.00 SLOT WELLPR MILL T WT (1000'), PUW =43K, RIW = 9K 10,625.0 10,625.0 03:18 04:18 Note: Canrig data is faulty/bogus, troubleshoot issue 8/12/2017 8/12/2017 2.90 SLOT WELLPR MILL T OBM, annular = 3144, CWT =7K, 10,625.0 10,675.0 04:18 07:12 WOB = 1.91K, stalled at 10,639', PUW = 60K 8/12/2017 8/12/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 42 k, Wiper 10,675.0 10,675.0 07:12 07:42 back in hole, RIW 7 k 8/12/2017 8/1212017 2.60 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,700 psi, BHP 10,675.0 10,725.0 07:42 10:18 3,995, WHIP 0, IA 0, OA 629, 8/12/2017 8/12/2017 0.50 SLOT WELLPR MILL T Wiper up hole, 9,800', PUW 41 It, 10,725.0 10,220.0 10:18 10:48 RBIH, RIW 7 k 8/12/2017 8/12/2017 0.50 SLOT WELLPR MILL T Log formation correction of minus 10,220.0 10,268.0 10:48 11:18 61.5', inspect and clean counter 8/12/2017 8/12/2017 0.45 SLOT WELLPR MILL - T Wiper back in hole, RIW 7 k 10,268.0 10,725.0 11:18 11:45 8/12/2017 8/12/2017 2.25 SLOT WELLPR MILL T BOSM, 1.8 bpm at 3,499 psi, BHP 10,725.0 10,784.0 11:45 14:00 2,772, WHIP 0, IA 0, OA 596, CTSW=10.2,k, DHWOB=2.2, ROP 21 fph 8/122017 8/12/2017 0.75 SLOT WELLPR MILL T Wiper up hole to 9,783', 1000' PUW 10,784.0 10,784.0 14:00 14:45 43 k 8/12/2017 8/12/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 3,500psi, BHP 10,784.0 10,840.0 14:45 16:45 2,921, WHIP 0, IA 0, OA 588, CTSW=7 -1 Ok, DHWOB=2.5k, ROP 30 fph 8/12/2017 8/12/2017 1.20 SLOT WELLPR MILL T Wiper up hole 1000', PUW = 40K, 10,840.0 10,840.0 16:45 17:57 RIW = 8.51K 8/1212017 8/12/2017 1.90 SLOT WELLPR MILL T BOBM pumping 1.78 bpm, CWT = 10,840.0 10,890.0 17:57 19:51 3.2K, WOB = 2.4K, annular = 2871 psi, IA = 0 psi, OA = 586 psi, circ pressure = 3645 psi, stall at 10,858', PUW = 52K, pump 5x5 sweeps 8/12/2017 8/12/2017 1.00 SLOT WELLPR MILL T Wiper up -hole 1000%PUW =42.5K, 10,890.0 10,890.0 19:51 20:51 tie-in for -3' correction, RIW = 8K 8/12/2017 8/12/2017 2.30 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 800 10,890.0 10,946.0 20:51 23:09 psi, CWT = 6K, WOB = 2K, annular = 2641 psi, circ pressure = 3662 psi 8/12/2017 8/12/2017 0.70 SLOT WELLPR MILL T WT up -hole 1000', PUW = 42K, RIW = 10,946.0 10,946.0 23:09 23:51 8K 8/12/2017 8/13/2017 0.15 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 778 10,946.0 10,949.0 23:51 00:00 psi, CWT = 3.5K, WOB = 2.31K, annular = 2903 psi 8/13/2017 8/13/2017 1.70 SLOT WELLPR MILL T Continue milling at 10949', pumping 10,949.0 10,990.0 00:00 01:42 1.8 bpm, CWT = 3K, WOB = 2K, annular= 2906 psi, pump sweeps 8/13/2017 8/13/2017 0.70 SLOT WELLPR MILL T Wiper 1 000'up-hole, PUW =43K, 10,990.0 10,990.0 01:42 02:24 RIW =8K 8/13/2017 8/13/2017 2.80 SLOT WELLPR MILL T BOBM pumping 1.8 bpm, FS = 809 10,990.0 11,040.0 02:24 05:12 psi, CWT = 7K, WOB = 2.4K, annular = 2880 psi, WHIP = 0 psi, IA = 0 pis, OA = 595 psi, circ pressure = 3775 psi, MW In = 8.47 ppg, MW Out = 8.47 ppg, LSRV = 19.9K, stalled at 11,013% pump sweeps, stall at 11,033', PUW = 52K 8/13/2017 8/13/2017 1.00 SLOT WELLPR MILL T WT up -hole 1000', PUW = 47 k 11,040.0 11,040.0 05:12 06:12 Page 8151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) r. 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stert Depth SteriTime Ertl Thne Dur (ho Phew op code A ety Code Time PJ -X Operation (RKe) End Depth Mot) 8/13/2017 8/13/2017 2.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,500 psi, BHP 11,040.0 11,090.0 06:12 08:12 2,976, WHP 0, IA 0, OA 611, CTSW=7 it, DHWOB=2.3 k, ROP 28 fph 8113/2017 8/13/2017 0.80 SLOT WELLPR MILL T Wiper up hole, 1000' PUW 43 k, with 11,090.0 10,090.0 08:12 09:00 5x5 sweep 8/13/2017 8/13/2017 3.00 SLOT WELLPR MILL T BOBM, 1.8 bpm at 4,759 psi, BHP 11,090.0 11,155.0 09:00 12:00 3,054. WHP 0, IA 0, OA 629, CTSW=6 It, DHWOB=2.6 it, ROP 29 fph 8/13/2017 8/13/2017 2.50 SLOT WELLPR MILL T Pump 5x5 sweep, POOH, (open EDC 11,155.0 78.8 1200 14:30 Q 9,093') 8/13/2017 8113/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 78.8 78.8 14:30 15:00 8/13/2017 8/13/2017 0.75 SLOT WELLPR MILL T LD BHA, remove BHI check valves 78.8 0.0 15:00 15:45 8/13/2017 8/13/2017 2.25 SLOT WELLPR MILL T PU/MU, noule, stab INJH, jet stack 0.0 0.0 15:45 18:00 and surface lines, grease tree & stack 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Perform BOPE Test (begin test at 0.0 0.0 18:00 19:00 18:00 hm), witness waived by AOGCC (Brian Bixby), break off n=le, slide back cart, put on night-cap. 8/13/2017 8/13/2017 1.00 SLOT WHDBOP BOPE P Test #1, (fail/pass on low), was 0.0 0.0 19:00 20:00 leaking past Bleeder 4 8/13/2017 8/13/2017 1.40 SLOT WHDBOP BOPE P Continue BOPE test, a bit of difficulty 0.0 0.0 20:00 21:24 getting low on Test #4, pressure up to 1500 psi, bled down, pass 8/13/2017 8/13/2017 0.90 SLOT WHDBOP BOPE T Test #5, grease Bravo 2, fail/pass 0.0 0.0 21:24 22:18 8/13/2017 8/13/2017 0.70 SLOT WHOBOP BOPE P Continue BOPE test 0.0 0.0 22:18 23:00 8/13/2017 8/13/2017 0.80 SLOT WHDBOP BOPE T Test #9, grease & cycle Romeo 3, 0.0 0.0 23:00 23:48 fail/pass 8113/2017 8/14/2017 0.20 SLOT WHOBOP BOPE P Continue BOPE test 0.0 0.0 23:48 00:00 8/14/2017 8/14/2017 2.00 SLOT WHDBOP BOPE P Continue BOPE test (8hr test) 0.0 0.0 00:00 02:00 8114/2017 8/14/2017 2.00 SLOT WELLPR MILL T Replace houred out UQC, replace 0.0 0.0 02:00 04:00 checks, open & clean out MM & choke lines, transducer lines & TT lines of potential cement fall out, await BOT arrival 8/14/2017 8/14/2017 1.50 SLOT WELLPR MILL T PJSM, PU BHA#7 (2.81"junk mill, 0.0 74.0 04:00 05:30 BOT motor, agitator, up/down jars, 10' pup), slide in cart, stab on, RIH to 738' test agitator (good -lest) 8/14/2017 8/14/2017 2.25 SLOT WELLPR MILL T RIH 74.0 10,305.0 05:30 07:45 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T Log formation, loo deep, PBUH, re- 10,305.0 10,170.0 07:45 08:15 start logging 10,170' 8/1412017 8/14/2017 0.25 SLOT WELLPR MILL T Log formation correction of plus 36' 10,170.0 10,259.0 08:15 08:30 8/14/2017 8/14/2017 0.50 SLOT WELLPR MILL T RIH 10,259.0 11,171.0 08:30 09:00 8114/2017 8/14/2017 1.75 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,400 psi, BHP 11,171.0 11,210.0 09:00 10:45 2,734, WHP 0, IA 0, OA 497 8/14/2017 8/14/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000', PUW 43 k, 11,210.0 11,210.0 10:45 11:30 1 1 1 1 1 1 RBIH, RIW 10 k, with 5x5 sweep Page 9151 Report Printed: 9/2712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tiri'ie Log Start Depth Start Time End Time Our (hr) Phase Op code Activity Cade T ne P -T -X Openetian (Itl(B) End Depth (WS) 8/1412017 8/14/2017 1.30 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,180 psi, BHP 11,210.0 11,260.0 11:30 12:48 3,860, WHIP 0, IA 0, OA 494, CTSW=11 k, DHWOB=2.4 k, ROP=45 fph 8/14/2017 8/14/2017 0.75 SLOT WELLPR MILL T Wiper up hole 1000', PUW 38 k, wiper 11,260.0 11,260.0 12:48 13:33 back in hole, RIW 9 k with 5x5 sweep 8/14/2017 8/14/2017 1.65 SLOT WELLPR MILL T OBM, 1.7 bpm at 3,040 psi, BHP 11,260.0 11,314.0 13:33 15:12 2,825. WHP 0, IA 0, OA 510, CTSW=9 k, DHWOB=2.9 k, ROP=37 fph 8/14/2017 8/14/2017 0.70 SLOT WELLPR MILL T WT up -hole 1000'@ 100 fpm, PUW = 11,314.0 11,314.0 15:12 15:54 41K, RIW=11K 8/14/2017 8/14/2017 1.60 SLOT WELLPR MILL T OBM, 1.7 bpm, 1.7 bpm, CWT = 7.5K, 11,314.0 11,365.0 15:54 17:30 WOB = 1.7K 8/14/2017 8/14/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW =40K, RIW = 11,365.0 11,365.0 17:30 17:54 11K 8/14/2017 8/14/2017 2.70 SLOT WELLPR MILL T OBM, CWT =9K, WOB =2.7K, 11,365.0 11,415.0 17:54 20:36 annular = 2882 psi, circ pressure = 3181 psi 8/14/2017 8/14/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', 100 fpm, PUW = 11,415.0 11,415.0 20:36 21:00 39K, RIW = 10 K 8/14/2017 8/15/2017 3.00 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT =6KK, WOB = 11,415.0 11,462.0 21:00 00:00 2.5 K, annular = 2919 psi, FS = 854 psi, pump sweeps, slower ROP at. - 17 fph, PUW = 45K from 11,483' 8/1512017 8/15/2017 0.20 SLOT WELLPR MILL T Continue milling from 11,462' 11,462.0 11,465.0 00:00 00:12 8115/2017 8115/2017 0.50 SLOT WELLPR MILL T WT up -hole 1000' at 100 fpm, PUW = 11,465.0 11,465.0 00:12 00:42 45K, RIW = 10K, pause at 11,452'to inspect/troublshoot depth counter 8/15/2017 8/15/2017 3.50 SLOT WELLPR MILL T OBM, 1.7 bpm, CWT =6K, WOB = 11,465.0 11,516.0 00:42 04:12 1.9K, annular = 2923 psi, circ pressure = 3335 psi, PU from 11,472 to adjust depth counter, PUW = 44K, stall at 11,508', PUW = 48K 8115/2017 8/15/2017 0.40 SLOT WELLPR MILL T WT up -hole 1000', PUW = 44K, RIW = 11,516.0 11,516.0 04:12 04:36 8K 8/15/2017 - 8/15/2017 1.15 SLOT WELLPR MILL T A couple stalls getting to bottom, 11,516.0 11,530.0 04:36 05:45 OBM, 1.7 bpm, CWT = 4.8K, WOB = 1.6K, annular= 3012 psi 8/15/2017 6/15/2017 0.75 SLOT WELLPR MILL T Stall motor, PUH, differential 1,000 11,530.0 11,435.0 05:45 06:30 psi, higher then free spin. adjust pump rate, looks like we have chucked motor or have a failed agitator, inspect pipe gouge, take pictures, file down gouge, inspect counter heads CTES and INJH. 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T POOH, to inspect BHA 11,435.0 74.2 06:30 08:30 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T At surface, check well for flow, PJSM 74.2 0.0 08:30 09:00 8/15/2017 8115/2017 1.50 SLOT WELLPR MILL T LD BHA #7. PU BHA #8, (2.81"junk 74.2 580.0 09:00 10:30 mill, BOT motor, agitator, up/down jars, 10' pup) slide in cart, stab on, RIH to 567' test agitator (good -test) 8/15/2017 8/15/2017 1.80 SLOT WELLPR MILL T RIH 580.0 10,210.0 10:30 12:18 8/15/2017 8/15/2017 0.20 SLOT WELLPR MILL T Tie-In,+14'Correction 10,210.0 10,275.0 12:18 12:30 Page 10151 Report Printed: 9127/2017 . Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(hr) Phase Op Code Activity Code Time P -T -X Operation MKII) End Depth(ftKB) 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T RIH 10,275.0 11,542.0 12:30 13:00 8/15/2017 8/15/2017 2.00 SLOT WELLPR MILL T Tag TD. BOBM, 1.7 bpm, CWT= 8K, 11,542.0 11,590.0 13:00 15:00 WOB = 2.5K, annular= 3112 psi, circ pressure = 4178 psi, Pump 1 % DrillZone pill at 11,555': No Benefit, Mud -swap, New mud at bit: 11585' 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T WT up hole 1000', PUW = 45k, RIW = 11,590.0 11,490.0 15:00 15:30 10k 8/15/2017 8/15/2017 0.50 SLOT WELLPR MILL T BOBM, 1.7 bpm, CWT =12k, WOB = 11,590.0 11,599.0 15:30 16:00 2.6k, annualar = 2880 psi, circ pressure = 3464 psi 8/15/2017 8/15/2017 3.00 SLOT WELLPR MILL T Mechanical coupling on injector drive 11,599.0 11,599.0 16:00 19:00 chain separated. Wait on parts and repair. Circulate botttoms up. Shut down pumps. Open EDC. Circulate 2nd bottoms up. NAD NPT 3 Hours 8/15/2017 8/15/2017 0.10 SLOT WELLPR MILL T Injector motor coupler replaced, Close 11,599.0 11,599.0 19:00 19:06 EDC. estgabish circulation at .3 BPM up to 1 BPM, PUH, PUW=45K 8/15/2017 8/15/2017 3.40 SLOT WELLPR MILL T PUH clean to 11,480, RBIH to mill 11,599.0 11,650.0 19:06 22:30 cement, 1.7 BPM Q 3285 PSI FS, BHP=2928 8/15/2017 8/15/2017 0.40 SLOT WELLPR MILL T 11650, Wiper up to window with tie in 11,650.0 10,210.0 22:30 22:54 before entering GLM @ 11,666 8/1512017 8/15/2017 0.20 SLOT WELLPR MILL T Log GR for+2.5' correction 10,210.0 10,259.0 22:54 23:06 8/15/2017 8/15/2017 0.30 SLOT WELLPR MILL T Continue back to bottom to mill 10,259.0 11,651.0 23:06 23:24 8/15/2017 8/16/2017 0.60 SLOT WELLPR MILL T 11651', Mill, 1.7 BPM @ 3331 PSI FS 11,651.0 11,659.0 23:24 00:00 8/16/2017 8/16/2017 2.40 SLOT WELLPR MILL T Continue milling cement, 1.7 BPM Q 11,659.0 11,700.0 00:00 02:24 3331 PSI FS, 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=48K 11,700.0 11,700.0 02:24 02:54 8/16/2017 8/16/2017 2.60 SLOT WELLPR MILL T 11,700 Mill Cement, 1.7 BPM @ 3454 11,700.0 11,750.0 02:54 05:30 PSI FS 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pull 1000'wipertrip, PUW=45k 11,750.0 11,750.0 05:30 05:54 8/16/2017 8/16/2017 2.20 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT= 10K, WOB = 11,750.0 11,800.0 05:54 08:06 2.7K, annular = 3010 psi, circ pressure = 3650 psi 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1 000'wiper 11,800.0 11,800.0 08:06 08:36 trip, PUW=43k 8/16/2017 8/16/2017 2.50 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT= 8k, WOB = 11,800.0 11,850.0 08:36 11:06 2.7k, annular= 3115 psi, circ pressure = 3815 psi, Pump 5 bbl low vis sweep at 11,825'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,850.0 11,850.0 11:06 11:36 trip, PUW=44k 8/16/2017 8/16/2017 3.00 SLOT WELLPR MILL T BOBM. Increase rate to 1.8 bpm, 11,850.0 11,904.0 11:36 14:36 CWT = 8k, WOB = 2.8k, annular= 3255 psi, circ pressure = 4820 psi, Continue pumping low vis sweep every 25'. 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Fluid swap to 11,904.0 11,904.0 14:36 15:06 new system. Pull 1000' wiper trip, PUW = 43k Page 11/51 Report Printed: 912 712 01 7 Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tiind Log StaM1 Depth Start Tim. End Time our (hr) Phase Op Code Actively Code Time P-T-X Operation (ftKB) End Depth ((a(a) 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T BOBM. 1.8 bpm, CWT = 12k, WOB = 11,904.0 11,950.0 15:06 17:24 2.8k, annular = 2975 psi, circ pressure = 3575 psi 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Pull 1000' wiper 11,950.0 11,950.0 17:24 17:48 trip, PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 11950 Mill, 1.8 BPM @ 3504 PSI FS 11,950.0 12,000.0 17:48 20:06 8/16/2017 8/16/2017 0.40 SLOT WELLPR MILL T 12000', pump sweeps, pull 1000' 12,000.0 12,000.0 20:06 20:30 1 1 wiper. PUW=45K 8/16/2017 8/16/2017 2.30 SLOT WELLPR MILL T 12,0001, Mill, 1.8 BPM @ 3596 PSI. 12,000.0 12,050.0 2030 22:48 FS, BHP=3081 8/16/2017 8/16/2017 0.50 SLOT WELLPR MILL T 12050', Pump sweeps, pull 1000' 12,050.0 12,050.0 22:48 23:18 wiper, PYW=45K 8/16/2017 8/17/2017 0.70 SLOT WELLPR MILL T 120501, Mill, 1.8 BPM @ 3627 PSI FS, 12,050.0 12,066.0 23:18 00:00 BHP=3081 8/17/2017 8/17/2017 1.50 SLOT WELLPR MILL T 12066', Milling cement, 1.8 BPM @ 12,066.0 12,100.0 00:00 01:30 3627 PSI FS, BHP=3100 8117/2017 8/17/2017 0.50 SLOT WELLPR MILL T 12,100', Pump sweeps, pull 1000' 12,100.0 12,100.0 01:30 02:00 1 1 wiper, PUW=48K 8/17/2017 8/17/2017 1.50 SLOT WELLPR MILL T 12105', milling, 5' difference in bottom, 12,100.0 12,134.0 02:00 03:30 1.8 BPM @ 3676 PSI FS, BHP=3112 8/1712017 8/17/2017 2.50 SLOT WELLPR MILL T Motor stall, Pull off bottom motor 12,134.0 74.2 03:30 06:00 would not relieve pressure, Diff pressire 170OPSI @ .9 BPM. Can not get it to clear, Trip out for BHA. 6/17/2017 8/17/2017 1.10 SLOT WELLPR MILL T Verify well is dead. Unstab injector. 74.2 0.0 06:00 07:06 LD Mill, Motor, and Agitator. Test motor and agitator at surface with rig water and rig air. Inconclusive. Make up Agitator and nozzle. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Change out BOP manifold pressure 0.0 0.0 07:06 07:36 regulator. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Slab injector. Function test Agitator 0.0 0.0 07:36 08:06 from BHA #8 at surface on coil. 1.5 bpm, 1415 differential pressure. No agitation felt at surface. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 0.0 08:06 08:36 #8. PU Agitator from BHA #7 and nozzle. 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T Stab injector. Function test Agitator 0.0 0.0 08:36 09:00 from BHA #7 at surface on coil. 1.5 bpm, 667psi. 1.8 bpm 825 psi. No agitation felt at surface. 8/17/2017 8/17/2017 0.70 SLOT WELLPR MILL T Unstab injector. LD Agitator from BHA 0.0 73.6 09:00 09:42 #7. PU BHA #9. 0331 Ridge Set, BOT Motor, new Agitator. Stab injector. Replace stripper pack-off. 8/17/2017 8/17/2017 0.30 SLOT WELLPR MILL T RIH to 480' and shallow test Agitator. 73.6 480.0 09:42 10:00 1.8 bpm. Vissible vibration on counter wheel. 8/17/2017 8/17/2017 2.20 SLOT WELLPR MILL T RIH. Tie-in+17'conection. RIH to 480.0 12,132.0 10:00 12:12 bottom. 8/17/2017 8/17/2017 1.30 SLOT WELLPR MILL T BOBM. 1.7 bpm, Free Spin = 870 psi, 12,132.0 12,185.0 12:12 13:30 CWT = 11 K, WOB = 2K, annular = 3190 psi, circ pressure = 4200 psi. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=47k. 12,185.0 12,185.0 13:30 14:00 Page 12151 Report Printed: 9/27/2017 . Operations Summary (with Timelog Oepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log startTime End Time our (hr) Phase Op Cede Adiviry Code Time P -T -X Operation Start Depth (RKB) End Depth(ftKB) 8/17/2017 8/17/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=10k, 12,185.0 12,232.0 14:00 15:00 WOB=2.5k, annular -3180 psi, circ --4200 psi. 8/17/2017 8/17/2017 0.50 SLOT WELLPR MILL T Pull 1000'wiper trip, PUW=50k. 12,232.0 12,232.0 15:00 1530 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT=7k, 12,232.0 12,282.0 15:30 17:06 WOB=2.5k, annular -3300 psi, circ=4360 psi. 8117/2017 8/17/2017 0.60 SLOT WELLPR MILL T Pull 1 000'wiper trip. PUW=53k. 12,282.0 12,282.0 17:06 17:42 8/17/2017 8/17/2017 1.40 SLOT WELLPR MILL T 12282', Mill, 1.7 BPM @ 4090 PSI FS, 12,282.0 12,335.0 17:42 19:06 BHP=3320 8/17/2017 8/17/2017 0.30 SLOT WELLPR MILL T 12335, 1000' wiper, PUW=48K 12,335.0 12,335.0 19:06 19:24 8/17/2017 8/17/2017 2.50 SLOT WELLPR MILL T 12335', Mill, 1.7 BPM @ 4090 PSI FS, 12,335.0 12,387.0 19:24 21:54 BHP=3320, New milling fluid around @ 12362 8/17/2017 8/17/2017 0.40 SLOT WELLPR MILL T 12387, 1000' wiper, PUW=52 K 12,387.0 12,387.0 21:54 22:18 8/17/2017 8/17/2017 1.60 SLOT WELLPR MILL T 12387', Mill, 1.7 BPM @ 3660 PSI FS, 12,387.0 12,435.0 22:18 23:54 BHP=3395 Cement void @ 12410 to 12414 with no WOB of differential pressure 8/17/2017 8/18/2017 0.10 SLOT WELLPR MILL T 12435, 1000' wiper, PUW=53K 12,435.0 12,040.0 23:54 00:00 8/18/2017 8/18/2017 0.30 SLOT WELLPR MILL T Continue 1000'wiper from 12434 12,040.0 12,434.0 00:00 00:18 8118/2017 8/18/2017 1.60 SLOT WELLPR MILL T 12434', Milling, 1.7BPM @ 3352 PSI 12,434.0 12,478.0 00:18 01:54 FS, BHP=3248, Couple of stalls in 12472' area. Posible seal locator 8/18/2017 8/18/2017 1.60 SLOT WELLPR MILL T During walkaroud injector motor 12,478.0 12,464.0 01:54 03:30 coupler coming loose. PUH and circulate bottoms up. Open EDC and continue to circulate. Begin NAD NPT . Start couple repair, 1.5 Hrs NAD NPT 8/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T Repairs Complete, shut EDC. 12,464.0 10,200.0 03:30 04:06 Continue wiper trip to tie in 8/18/2017 8/18/2017 0.20 SLOT WELLPR MILL T Log tie in for +17' Correction 10,200.0 10,242.0 04:06 04:18 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T RBIH to mill cement 10,242.0 12,492.0 04:18 04:48 8/18/2017 8/18/2017 3.00 SLOT WELLPR MILL T 12490', Mill, 1.7 BPM @ 3320 PSI FS, 12,492.0 12,550.0 04:48 07:48 BHP=3267, RIW=9.3K. Multiple stalls passing through jewelry. 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Wiper trip up hole 1000'. PUW=52k. 12,550.0 12,550.0 0748 08:18 8/18/2017 8/18/2017 1.00 SLOT WELLPR MILL T BOBM. 1.7 bpm, CWT= 10k, 12,550.0 12,576.0 08:18 09:18 WOB=1.6k, annular=3315 psi, circ --3700 psi. 8/18/2017 8/18/2017 1.40 SLOT WELLPR MILL T Tag D Profile nipple at 12,576' Mill 12,576.0 12,576.0 09:18 10:42 through with 6 stalls. 8/18/2017 8/18/2017 0.80 SLOT WELLPR MILL T Mill 9' below profile nipple. 1.7 bpm, 12,576.0 12,585.0 10:42 11:30 WOB=1.5k, annular -3340 psi, circ --3720 psi. Stalls at 12,582. Pickup through nipple with pumps off. No over pulls. . 8/18/2017 8/18/2017 0.50 SLOT WELLPR MILL T Pump 5 x 5 sweeps. Wiper up hole. 12,585.0 10,200.0 11:30 12:00 1 Page 13151 Report Printed: 912712077 . ; Operations Summary (with Timelog Depths) r - 3M -27 C..• Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log I Start OapM De SW Time End Time Our(hr) Phase Op Code ArAWfy Code Time P -T -X Openefion (M End Depth (IrNa) 8/18/2017 8/18/2017 0.70 SLOT WELLPR MILL T Tie -In. +6.5' Correction. RIH to 10,200.0 12,300.0 12:00 12:42 logging depth. 8/18/2017 8/18/2017 0.30 SLOT WELLPR MILL T Log CCL from 12,300'tc 12585' 12,350.0 12,589.0 12:42 13:00 8/182017 8/18/2017 2.50 SLOT WELLPR MILL T POOH. Open EDC at 8975'. Close 12,589.0 73.6 13:00 15:30 EDC for Agitator test. Test Agitator at 307'. Goosneck vibrating. Re -Open EDC. 8118/2017 8/18/2017 1.00 SLOT WELLPR MILL T PJSM. Verify well is static. Un -Stab 73.6 0.0 15:30 16:30 injector. LD BHA#9. Gauge mill 2.76" No -Go. Discuss next BHA with town. 8/18/2017 8/18/2017 0.60 SLOT WELLPR MILL T PU BHA #10. Re -Run 2.76" D331 0.0 71.9 16:30 17:06 Ridge Set, Hailey Under Reamer with 2.875" banana blades, BOT motor, 2.73" stabilizer, BOT jars. Replace stripper packing. Stab injector. 8/18/2017 8/18/2017 2.00 SLOT WELLPR MILL T RIH with EDC open. 71.9 10,200.0 17:06 19:06 8/18/2017 8/182017 0.20 SLOT WELLPR MILL T Log tie in point for+16' correction 10,200.0 10,260.0 19:06 19:18 8/18/2017 8/182017 0.50 SLOT WELLPR MILL T Continue in well 10,260.0 12,569.0 19:18 19:48 8/18/2017 8/18/2017 0.10 SLOT WELLPR MILL T Tag up @ 12569, Pull up to break . 12,569.0 12,559.0 19:48 19:54 over, PUW=51 K, PIU 10 mpre feel .8/18/2017 8/19/2017 4.10 SLOT WELLPR MILL T Close ECD, Pring pumps online @ 1.7 12,559.0 10,397.0 19:54 00:00 BPM @ 4990. High vibration. Reduce _ rate to 1.5 BPM @ 4400 PSI. Vibration managable, Ream uphole @ 10 FPM. See additional motor work @ 12345, - 12332, 12323, 12279, 12157, and 12140 8/19/2017 8/19/2017 2.30 SLOT WELLPR MILL T Continue reaming up @ 10 FPM, 1.5 10,397.0 9,100.0 00:00 02:18 BPM @ 4400 PSI FS, Ream up to orginal TOC, Pump 5 X 5 sweeps, Open edc 8/19/2017 8/19/2017 1.60 SLOT WELLPR MILL T Trip out of well, EDC open 9,100.0 101.0 02:18 03:54 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T At surface, Flow check well, PJSM lay 101.0 0.0 03:54 04:54 down BHA on dead well, U/reamer arms at 2.75" lower and 2.78" upper 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T M/U BHA #11 with 2.79 NoGo D331 0.0 74.6 04:54 05:54 mwith ridge cutters on straight BOT motor 8/192017 8/19/2017 2.70 SLOT WELLPR MILL T RIH. Shallow test Agitator at 328'. Tie 74.6 12,579.0 05:54 08:36 -In +21' correction. Tag D -Nipple at 12,579' 8/192017 8/1912017 1.20 SLOT WELLPR MILL T Dress up D -Nipple. 1.7 bpm. Free 12,576.0 12,587.0 08:36 09:48 Spin: 840 psi. High vibration. 1 Stall. Tag TD. Drift back through minimum rate. Make 7 down reaming passes. 8/19/2017 8/19/2017 2.20 SLOT WELLPR MILL T POOH. Shallow test agitator. 12,587.0 102.0 09:48 12:00 8/19/2017 8/19/2017 1.00 SLOT WELLPR MILL T Verify well is static. PJSM. Un -Stab 102.0 0.0 12:00 13:00 Injector. LD BHA #11. Gauge mill 2.75" No Go. 8/19/2017 8/19/2017 1.50 SLOT WELLPR MILL T Discuss next BHA with town. PU BHA 0.0 74.7 13:00 14:30 #12, 2.80" slick D331. Check packing in stripper. Slab Injector. Page 14151 ReportPrinted: 9/272017 Operations Summary (with Timelog Depths) 3M-27 0 1 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TOW6 Log Slap Tine End rme Dor(hrt Phase Op Code Aclivly Code Tnne P -T -X Operation Start Depth (n eB)) End Depth (WS) 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T RIH. Shallow test Agitator at 380'. Tie 74.7 12,587.0 14:30 16:36 -In +20' correction. pass through D - Nipple at 12577, Tag bottom @ 12,587 8/19/2017 8/19/2017 1.80 SLOT WELLPR MILL T Make multiple passes through nipple 12,587.0 12,580.0 16:36 18:24 area, 5. Dry drift nipple area - good 8/19/2017 8/19/2017 2.10 SLOT WELLPR MILL T POOH, stop and open EDC @ 12556 12,580.0 95.0 1824 20:30 8/19/2017 8/19/2017 0.50 SLOT WELLPR MILL T At surface, Flow check well, Lay down 95.0 0.0 20:30 21:00 BHA #12, Mill out @ 2.79 NoGo 8/19/2017 8/19/2017 1.30 PROD? RPEQPT PULD P Make up BHA # 13 with new D-331 0.0 68.5 21:00 22:18 slick gauge mill, .9° AKO motor and agitator, M/U to coil and surface test, Inspect packoffs 8/19/2017 8/20/2017 1.70 PROD1 RPEQPT TRIP P Trip in hole, BHA #13 pilot hole 68.5 8,660.0 22:18 00:00 milling, 700' shallow test agitator - good. Continue in 8/20/2017 8/20/2017 0.30 PRODi RPEQPT TRIP P Continue tripping in well 6,660.0 10,200.0 00:00 00:18 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT DLOG P Log Gamma tie in for+15.5', 10,200.0 10,249.1 00:18 00:30 8/20/2017 8/20/2017 0.70 PROD1 RPEQPT TRIP P Continue trip in, Bring pump online @ 10,249.1 12,588.0 00:30 01:12 12544. Clean pass through milled D nipple area 8/20/2017 8/20/2017 6.50 PROD1 RPEQPT MILL P Tag up @ 12588 and mill ahead, 1.7 12,588.0 12,716.0 01:12 07:42 BPM @ 3588 PSI FS. Stall and hard going @ 12598. Call 7" contact. Had to roll TF to 200° to get milling. 12599' roll TF back to 20R, ROP 20-25 FPH with - 2K DHWOB. Stalls at 12,703' and 12,705'. Orienler loosing high side at 12708' Suspect magnetic interference. Lock orienter 20R. 8/20/2017 8/20/2017 0.40 PROD1 RPEQPT MILL T Injector coupling separating again. 12,716.0 12,589.0 07:42 08:06 Pickup into tubing tail to repair, 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT MILL T RIH back to bottom. 12,589.0 - 12,716.0 08:06 08:12 8/20/2017 8/20/2017 3.60 PROD1 RPEQPT MILL P BOBM. 1.7 bpm, WOB=2k, 12,716.0 12,755.0 08:12 11:48 Annular -3510 psi, Pump=4090 psi. Orienler locked based on internal highside toolface. 3 stalls at 12,730'. Pickup and re -verify toolfaoe. Difficulty working past 12,730' ROP returned to 20'/hr after passing. TD pilot hole at 12,755' 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P POOH to back ream transition. 12,755.0 12,603.0 11:48 11:54 PUW=48k. 8/20/2017 8/20/2017 0.30 PRODt RPEQPT REAM P Orient low side. Back ream transition. 12,603.0 12,584.0 11:54 12:12 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT TRIP P TIH. HOT still giving erratic readings 12,584.0 12,755.0 12:12 12:24 at 12,619' and 12,708'. Pump 5 x 5 - sweep at TD. 8/20/2017 6/20/2017 0.60 PROD1 RPEQPT CIRC P PUH into tubing tail. Wait for sweeps 12,755.0 12,476.0 12:24 13:00 to surface. 8/2012017 8/20/2011 0.40 PROD1 RPEQPT DLOG P Dry drift from tubing tail into pilot hole. 12,476.0 12,755.0 13:00 13:24 Tie -In with K1 marker. Zero Correction. 1k set downs 12,595' and 12,616. Tag TD. Page 15151 ReportPrinted: 9127/2017 . Operations Summary (with Timelog Depths) I� 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log smrma End rima Our(hh Phase op Code Activity Code Time P-T.X Operation SW pt h flK a EM Depth (flKB) 8/20/2017 8/20/2017 1.50 PRODt RPEQPT REAM P Back ream from 12,615'to tubing tail. 12,755.0 12,584.0 13:24 14:54 Dry drift second time: I weight at 12,595' and 0.5k at 12,615'. Back ream from 12,615'to tubing tail. Dry drift third time. PUH. Ream down at 57min, back ream up. Dry drift fourth time. Weight bobble less than 0.75k. 8/20/2017 8/2012017 2.00 PROW RPEQPT TRIP P POOH. Shallow test Agitator at 580'. 12,620.0 109.0 14:54 16:54 1 Good test. 8/20/2017 8/20/2017 1.80 PROD1 RPEQPT PULD P PJSM. Verify well is static. Unstab 109.0 0.0 16:54 18:42 Injector. LD BHA #13. Gauge Mill: 2.80 No Go. 8/20/2017 820/2017 1.00 PROD? RPEQPT PULD P PJSM, M/U BHA #14 HES caliper; 0.0 24.6 18:42 19:42 M/U to coil and surface test caliper. 8/20/2017 8/20/2017 2.30 PROD? RPEQPT TRIP P RIH BHA #14 pilot hole caliper run 24.6 12,500.0 19:42 22:00 8/20/2017 8/20/2017 0.20 PROD1 RPEQPT DLOG P Tie into K1 for+19.3 12,500.0 12,658.0 22:00 22:12 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P Continue in well 12,658.0 12,744.0 22:12 22:18 8/20/2017 82012017 0.10 PROD1 RPEQPT DLOG P PUH logging pilot hole 1st run, 12,744.0 12,500.0 22:18 22:24 PUW=52K 8/20/2017 8/20/2017 0.10 PROD1 RPEQPT TRIP P Trip back to bottom 12,500.0 12,744.0 22:24 22:30 8/20/2017 8/20/2017 1.30 PROD1 RPEQPT DLOG P PUH logging to 8900, PUW=52K 12,744.0 8,900.0 22:30 23:48 8/20/2017 821/2017 0.20 PROD1 RPEQPT TRIP P End of logging pass, Close caliper 8,900.0 8,503.0 23:48 00:00 1 1 1 fingers, Trip out of well 8/21/2017 821/2017 1.50 PROD1 RPEQPT TRIP P Continue tripping out with HES caliper 8,503.0 67.0 00:00 01:30 8/21/2017 821/2017 0.30 PROD1 RPEQPT PULD P PJSM, Lay down BHA #14 on dead 67.0 0.0 01:30 01:48 well 8/21/2017 8/21/2017 1.20 PROD1 RPEQPT PULD P PJSM, M/U BHA#15, Whipstock with 0.0 74.0 01:48 03:00 OH anchor, M/U to coil and surface test 8/21/2017 8/21/2017 2.40 PROD1 RPEQPT TRIP P RIHw/Whipstock 74.0 12,600.0 03:00 05:24 8/21/2017 821/2017 0.10 PROD1 RPEQPT DLOG P Log K1 for+15.5 12,600.0 12,625.0 05:24 05:30 821/2017 8/21/2017 0.70 PROD? RPEQPT TRIP P Continue to setting depth, PUW=49K, 12,625.0 12,722.7 '05:30 06:12 continue up hole to 12695 trying to get orientation to clear up. PUH to 12635, RBIH to 12655'. tool seems stable, RBIH to set depth 12,722.7. Using internal TF. Close EDC. Pumps on, See tool shift @ 3700 PSI, DHWOB to 2.02K. Set down 2.5K - Good. 8/21/2017 8/21/2017 2.80 PROD1 RPEQPT TRIP P Open EDC. POOH. 12,722.7 100.0 06:12 09:00 8/212017 8/21/2017 0.20 PROD1 RPEQPT CTOP T Observe CT indention at 79.5' from 100.0 100.0 09:00 09:12 whip end. Photograph damage. 8/21/2017 8/2112017 0.80 PROD1 RPEQPT PULD P PJSM. Verify well is static. Un -Stab 100.0 0.0 09:12 10:00 injector. LD BHA#15. 8/21/2017 821/2017 1.00 PROD1 RPEQPT CIRC P Close master valve. PU nozzle. Re- 0.0 0.0 10:00 11:00 Stab injector. Jet out stack and surface lines. Page 16151 Report Printed: 9/27/2017 . - -- Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Alan Dept Shut Time EM Time Our (hr) Phase Op Code A vty Cotle Time P-T-X Operation Me) End Depth (hKS) 8/21/2017 8/21/2017 1.50 PROD1 RPEQPT CIRC P Un-stab injector. Grease tree valves. 0.0 0.0 11:00 12:30 Install test joint cycle rams and circulate citric acid through stack. Pull test joint cycle rams and circulate citric acid followed by fresh water. Install BOP test cap. 8/21/2017 8/2112017 0.80 FROM RPEQPT BOPE P PJSM. Begin SOP test at 12:30 0.0 0.0 12:30 13:18 hours. Witness waived by AOGCC (Jeff Jones). Tests to 250 psi low, 42000 psi high. Attempt shell test. Regrease C5. Replace bleeder on C4. 8/21/2017 8/21/2017 1.60 PROD1 RPEQPT BOPE P Test #1(Upper Swab): Pass 0.0 67-0- 13:18 14:54 Test #2 (Obsolete) Test #3 (Lower Blind/Shear, TV2): Pass Test #4 (V1): Pass Test#5 (Upper Blind/Shear, Bt, B5, C4, C5, C8, C12, R1, BLt): Pass Test #6 (C3, C6, C7, C11, B2, B6, T2): Fail 8/21/2017 8/21/2017 0.60 FROM RPEQPT BOPE T Re-Grease C7 and C11. 0.0 0.0 14:54 15:30 1 1 1 Re-Test #6: Pass 8/21/2017 8/21/2017 2.90 FROM RPEQPT BOPE P Test #7 (Choke D, Choke C): Pass 0.0 0.0 15:30 18:24 (1500 psi / Function) Test #8 (C2, C10, TI): Pass Test#9 (R2, BL2, C1, C9): Pass Test #10 (B4, B8, R3, BL3): Pass Test #11(133, B7): Pass Remove tree cap. Install test joint and fill. Test gas alarms: Pass Test #12 (Annular): Pass (2500 psi) Test #13 (Upper 2-3/8, Upper TIW): Pass Test #14 (Lower 2-3/8): Pass Test #15 (Lower Pipe/Slip): Fail 8/21/2017 8/2112017 0.60 FROM RPEQPT BOPE T Cycle ram. 0.0 0.0 18:24 19:00 Re-Test *15: Pass 8/21/2017 8/2112017 2.10 FROM RPEQPT BOPE P Test #16 (Upper Pipe/Slip, Lower 0.0 0.0 19:00 21:06 TIW): Pass Accumulator recharge: Pass Remove test joint. Re-Stab Injector. Test inner reel valve and stripper: Pass BOP test complete. Blow down drilling choke. 8/21/2017 8/21/2017 0.90 FROM RPEQPT CTOP T LD nozzle, blind sub, and UQC. Boot 0.0 0.0 21:06 22:00 wireline. Stab injector. Pump slack backwards. Un-stab injector. 8/21/2017 8/22/2017 2.00 PROD1 RPEQPT CTOP T PJSM. Cul 193' of coil to remove 0.0 0.0 22:00 00:00 damage. Cut 88' pipe to find wire 8/22/2017 8/22/2017 2.00 PROD1 RPEQPT CTOP T Continue making up coil tubing 0.0 0.0 00:00 02:00 connector, Pull test to 35K- Good. M/U UQC, Test wire (>550 Mohms /77.4 Ohmes). Fluid pack coil and pressure test CTC and UQC to 4450 PSI 8/22/2017 0.50 PROD1 RPEQPT CTOP T Skid back injector / Run pipe into pipe 0.0 0.0 02:00 18/22/2017 1 02:30 I I shed inspecting gripper blocks - . Chains for damage or foreign objects Page 17151 Report Printed: 9127/2017 .,. Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Sted Tane End Tme Dur (hr) Phase Op Code Adiviy Code Time P-T-X Operation (I") End Depth(ft(B) 8/22/2017 8/2212017 1.30 PROD1 WHPST PULD P PJSM, M1U P/U BHA # 16 Window 0.0 74.3 02:30 03:48 milling BHA with .6' motor, 2.79 string reamer, and 2.80 dimond window mill, Make up to coil and surface test - good 8/22/2017 8/22/2017 2.30 PROD1 WHPST TRIP P RIH, EDC open, Pumping 1 BPM 74.3 12,583.0 03:48 06:06 8/22/2017 8/22/2017 0.70 PROD1 RIGMNT TRIP T Inspect coupler / Tighten 12,583.0 12,583.0 06:06 06:48 8/22/2017 8/22/2017 0.10 PROD1 WHPST TRIP P Continue in well 12,583.0 12,600.0 06:48 06:54 8/22/2017 8/22/2017 0.10 PRODt WHPST DLOG P Log K1 for+15.5' 12,600.0 12,628.0 06:54 07:00 8/22/2017 8/22/2017 0.70 PROD1 WHPST TRIP P Continue in well displaceing used 12,628.0 12,713.0 07:00 07:42 8.8ppg PwrPro tripping in, stop 12651 and close EDC, Dry tag whipstock @ 12713. Having tool face issues. go to MWD internal toolface 8/22/2017 8/22/2017 4.80 PROD1 WHPST MILL P Milling window, 12713', 1.6BPM @ 12,713.0 12,719.0 07:42 12:30 3685 PSI FS, BHP=3753 8/22/2017 8/22/2017 3.40 PROD1 WHPST MILL P Call bottom of window 12719, Milling 12,719.0 12,735.0 12:30 15:54 rathole 8/22/2017 8/22/2017 2.50 PROD1 WHPST REAM P At bottom of rat hole, ream window 12,735.0 74.0 15:54 18:24 per procedure, PUW=40K As drilled, 30° ROHS, 30° LOHS, 180° ROHS 8/22/2017 8/2212017 3.00 PROD1 WHPST TRIP P POOH, Marks and Gouge on coil, take 74.0 74.0 18:24 21:24 pictures, and upload to s:drive. 8/22/2017 8/22/2017 0.70 PROD? WHPST OWFF P At surface, check well for flow, PJSM 74.0 74.0 21:24 22:06 8/22/2017 8/22/2017 1.60 PROD1 WHPST PULD P PUD & LD Window milling BHA, 74.0 0.0 22:06 23:42 Window Mill 2.78 no-go, string mill 2.79 no-go 8/22/2017 8/23/2017 0.30 PROD1 DRILL PULD P PU/MU Build Section BHA# 17 0.0 0.0 23:42 00:00 8/23/2017 8/23/2017 0.50 PROD1 DRILL PULD P Continue. PU/MU/ PD build section 0.0 0.0 00:00 00:30 BHA# 17 8/23/2017 8/23/2017 1.00 PROD1 DRILL PULD T Scope change, kink in slick line. 0.0 0.0 00:30 01:30 PJSM, swap to ODS PDL. 8/2312017 8/23/2017 1.50 PROD1 DRILL PULD P Continue PD Buld BHA# 17 0.0 72.2 01:30 03:00 8/2312017 8/23/2017 0.20 PROD1 DRILL PULD P Surface test BHI tools (good test), 72.2 72.2 03:00 03:12 slab INJH, tag up, reset counters 8/23/2017 8/23/2017 2.30 PRODf DRILL TRIP P RIH 72.2 12,585.0 03:12 05:30 8/23/2017 8/23/2017 0.20 PROD1 DRILL DLOG P Log K1 for+20.5' 12,585.0 12,633.0 05:30 05:42 8/23/2017 8/23/2017 0.20 PROD1 DRILL TRIP P Continue in well, Close EDC @ 12,633.0 12,735.0 05:42 05:54 12677, PUW=44K, Clean pass through window, Tag up at 12735 8/23/2017 8/23/2017 1.80 PROD1 DRILL DRLG P 12735', Drill, 1.8 BPM @ 4375 PSI 12,735.0 12,808.0 05:64 07:42 FS, BHP=3646 8/23/2017 8/23/2017 0.20 PRODt DRILL WPRT P PUH to tie in and log RA, PUW=42K 12,808.0 12,600.0 07:42 07:54 8/23/2017 8/23/2017 0.10 PROD1 DRILL DLOG P Log K1 for -1' RIH and log RA @ 12,600.0 12,730.0 07:54 08:00 12719, TOWS=12712.5 8/23/2017 8/23/2017 0.30 PROD1 DRILL WPRT P RBIH to drill 12,624.0 12,808.0 08:00 08:18 Page 18151 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log smnoepm sled Time End Time our(hr) Phase Op code AdAy Code Time P -T -X Operation (ftKB) EM Depth (SMO) 8/23/2017 8/23/2017 2.20 PRODt DRILL DRLG P 12808', Drill ahead, 1.8 BPM @ 4352 12,808.0 12,818.0 08:18 10:30 PSI FS, BHP=3902 8/23/2017 8/23/2017 6.50 PROD1 DRILL DRLG P PUW 40 k, OBD 1.8 bpm at 4318 psi 12,818.0 12,950.0 10:30 17:00 FS, BHP 3,897, IA 0, OA 483 8/23/2017 8/23/2017 2.50 PROD1 DRILL TRIP P PUH slowly until sweep out the bit, 12,950.0 72.2 17:00 19:30 POOH 8/2312017 8123/2017 1.15 PROD1 DRILL PULD P PJSM, PUD & LD build section BHA 72.2 0.0 19:30 20:39 8/23/2017 8123/2017 1.50 PROD1 DRILL PULD P PU/MU/PD lateral section BHA, BHA# 0.0 78.2 20:39 22:09 18, surface test tools (good -test) 8/23/2017 8/24/2017 1.85 PROD1 DRILL TRIP P Tag up, reset counters, RIH 78.2 8,500.0 22:09 00:00 8/24/2017 8/24/2017 0.50 PROD1 DRILL TRIP P Continue RIH 8,500.0 12,595.0 00:00 00:30 8/24/2017 8/24/2017 0.10 PROD1 DRILL DLOG P Log the K1 marker correction of plus 12,595.0 12,615.0 00:30 00:36 22', PUW 41 k, RIW 13 k 8/24/2017 8/24/2017 0.30 PROD1 DRILL TRIP P Continue in well 12,615.0 12,951.0 00:36 00:54 8/24/2017 8/24/2017 3.40 PROD1 DRILL DRLG P OBD 1.8 bpm at 4,896 psi FS, BHP 12,951.0 13,360.0 00:54 04:18 3970, WHIP 106, IA 0, OA 373, CTSW=12 k, DHWOB=2.0 k, R0P=100 fph 8/24/2017 8/2412017 0.40 PROD1 DRILL WPRT P Wiper to 12980', PUW=41K 13,360.0 13,360.0 04:18 04:42 8/24/2017 8/24/2017 9.00 PROD1 DRILL DRLG P 13360', Drill, 1.76 BPM @ 4785 PSI 13,360.0 13,760.0 04:42 13:42 FS, BHP=3843, RIW=10.8K, Encountered more Ankorite 8/24/2017 8/242017 0.75 PROD1 DRILL WPRT P 13760', Wiper to 12975', PUW=45K 13,760.0 13,760.0 13:42 14:27 8/24/2017 8/242017 6.40 PROD1 DRILL DRLG P 13760', Drill, 1.8 BPM @ 5037 PSI 13,760.0 14,160.0 14:27 20:51 FS, BHP=3862 PSI, RIW=10K 8/24/2017 8/24/2017 0.50 PROD1 DRILL WPRT P Wiper up hole to 12,725', PUW 45 k 14,160.0 12,735.0 20:51 21:21 824/2017 8/242017 0.25 PR001 DRILL DLOG P Log the RA correction of plus 2.5' 12,735.0 12,766.0 21:21 21:36 8/242017 8/242017 0.50 PROD1 DRILL WPRT P Wiper back in hole, RIW 13 k 12,766.0 14,160.0 21:36 22:06 8/24/2017 8/252017 1.90 PROD1 DRILL DRLG P BOBD 1.8 bpm at 3,908 psi FS, BHP 14,160.0 14,167.0 22:06 00:00 3,946, WHIP 67, IA 0, OA 560, CTSW =11.3 k, DHWOB=2.9 k, ROP 2 fph 8/252017 8/25/2017 3.50 PRODt DRILL DRLG P OBD, 1.8 bpm at 5,153 psi, 14,167.0 14,339.0 00:00 03:30 BHP=3,975, WHP=63, IA=O, OA=546, CTSW=4.4 k, DHWOB=2.9 k, ROP 60 fph 825/2017 8252017 3.30 PRODt DRILL DRLG P OBD, 1.8 bpm at 5,395 psi, 14,339.0 14,560.0 03:30 06:48 BHP=3,975, WHP=55, IA=O, OA=569, CTSW=2.2 k, DHWOB=2.5 k, ROP=62 fph 8/25/2017 8252017 0.70 PRODt DRILL WPRT P 14560', Wiper to 13560', PUW=45K 14,560.0 14,560.0 06:48 07:30 8/25/2017 8/25/2017 4.40 PRODt DRILL DRLG P 14560', Drill 1.78 BPM @ 5100 PSI 14,560.0 14,875.0 07:30 11:54 FS, BHP=3956, Avg ROP 40-60 FPH, Encountered signs of ankorite with low to no ROP. Good weight transfer 8/25/2017 8/252017 0.30 PROD1 DRILL WPRT P Pull Mini wiper, PUW=52K 14,875.0 14,875.0 11:54 12:12 Page 19151 Report Printed: 9127120171 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our (hr) Phase Op code Ac" Cade Time P -T -X Operation (110) End Depth (1](S) 8/25/2017 8/25/2017 6.00 PROD1 DRILL DRLG P 14875', Drill, 1.75 BPM @ 5100 PSI 14,875.0 14,920.0 12:12 18:12 FS, BHP=4002 8/25/2017 8/25/2017 0.25 PROD1 DRILL WPRT P BHA wiper 14,920.0 14,920.0 18:12 18:27 8/25/2017 8/25/2017 1.50 PROD1 DRILL DRLG P BOBD, 1.8 bpm at 5,493 psi, 14,920.0 14,960.0 18:27 19:57 BHP=3,975, WHP=41, IA=O, OA=600, CTSW=10 k, DHWOB=2.7 k, ROP=22 fph 8/25/2017 8/25/2017 1.00 PROD1 DRILL WPRT P Wiper up hole to 13,960'(1000), PUW 14,960.0 14,960.0 19:57 20:57 43 k 8/25/2017 3.05 PROD1 DRILL DRLG P BOBO, 1.8 bpm at 3,972 psi FS, 14,960.0 14,994.0 20:57 00:00 BHP=4,024, WHP=O, ]A=O, OA=605, j8/26/2017 CTSW=11.6 k, DHWOB=2.8 k, ROP=2 fph, TO lateral 8/26/2017 8/2612017 1.50 PROM DRILL WPRT P Pump 10x10 sweep, perform swab 14,994.0 12,944.0 00:00 01:30 wiper, PUW 44 k 8/26/2017 8/26/2017 1.15 PROM DRILL WPRT P Notice increase of 600 psi diff while 12,944.0 12,577.0 01:30 02:39 wiper up hole thru build section, RBIH, turn TF 180' from drilled TF, diff is lower, perform 7 clean out passes, no change, continue wiper up hole thru window to 12,596', 8/26/2017 8/26/2017 2.00 PROD1 DRILL WPRT P Perform static pressure survey, 11.7 12,577.0 78.2 02:39 04:39 ppg (3,700 psi annular), Open EDC, POOH pumping max rate, filling trip sheet 8/2612017 8/26/2017 0.50 PROD1 DRILL TRIP P Tag up at surface, inspect INJH, reset 78.2 78.0 04:39 05:09 counters. 8/26/2017 8/26/2017 2.80 PROD1 DRILL TRIP P Trip in hole, EDC open, Pumping 78.0 12,595.0 05:09 07:57 8/26/2017 8/26/2017 0.10 PROM DRILL DLOG P Log K1 for+5.5, PUW=44K, Close 12,595.0 12,631.0 07:57 08:03 EDC 8/26/2017 8/26/2017 1.70 FROM DRILL TRIP P Continue in hole, clean through 12,631.0 14,960.0 08:03 09:45 window, Initial tag up @ 14960. Worked down to 14992. PUH waiting on beader liner pill. Hard time getting back in past 14960'. Call that bottom 8/26/2017 8/26/2017 3.10 PROD1 DRILL TRIP P Trip out pumping 12.OPPG beaded 14,960.0 98.0 09:45 12:51 liner running pill followed with 12 PPG completion fluid. Paint EOP flags (off 13150 & 10800' 8/26/2017 8/2612017 0.30 PROD! DRILL PULD P At surface, PJSM lay down BHA on 98.0 98.0 12:51 13:09 dead well, Flow check well - good 8/26/2017 8/26/2017 1.10 PROD1 DRILL PULD P Break off injector ant skid back, Lay 98.0 0.0 13:09 14:15 down BHA#18 8/26/2017 8/26/2017 0.70 COMPZ1 CASING RURD P PJSM, R/U to run liner, service 0.0 0.0 14:15 14:57 elevators and top drive 8/26/2017 8/26/2017 4.25 COMPZ1 CASING PUTB P WU BHA #19 with non ported 0.0 1,763.2 14:57 19:12 bullnose, 3 pup joints, Ms slotted liner, 2 tracers T-165 & T940, 40 As slotted liner, Aluminum liner top billet 8/26/2017 8/26/2017 2.50 COMPZ1 CASING RUNL P Test BHI Coiltrak tools (good test), tag 1,763.2 12,607.0 19:12 21:42 up, reset counters, RIH 8/26/2017 8/26/2017 0.15 COMPZ1 CASING RUNL P EDP flag, no correction, PUW 42 k 12,607.0 12,607.0 21:42 21:51 826/2017 8/26/2017 0.50 COMPZ1 CASING RUNL T Tighten Coupler on INJH 12,607.0 12,607.0 21:51 22:21 8/26/2017 8/26/2017 1.00 COMPZI CASING RUNL P Continue IH, RIHCTSW=12 k, 12,607.0 14,994.0 22:21 23:21 RIHDHWOB=O k Page 20151 Report Printed: 912 712 01 7 . Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Depth slan Tim End Time Dur(hr) Phase op co AdAy Cotle Time P-T-X operetion (R<13) End Oeptlt(Po(B) 8/26/2017 8/26/2017 0.15 COMPZ1 CASING RUNL P Tag bottom at 14,996', PUW 51 k, 14,994.0 13,230.4 23:21 23:30 CTSW=51 k, DHWOB=minus 5.6 k, set back down, bring pump up to 1.7 bpm, 0.80 bpm rertums, PUH, CTSW=38 k, DHWOB= 0 k, release liner on bottom. 8/26/2017 8/27/2017 0.50 COMPZI CASING TRIP P Remove liner length from BHA, POOH 13,230.4 9,945.0 23:30 00:00 ' 8/27/2017 8/27/2017 1.25 COMPZ1 CASING TRIP P Continue POOH wtih liner setting 9,941.0 44.2 00:00 01:15 tools, pumping 1.0 bpm at 2,288 psi 8/27/2017 8/27/2017 0.50 COMPZ1 CASING OWFF P At surface, check well for flow ( no- 44.2 44.2 01:15 01:45 flow), PJSM 8/2712017 8/27/2017 0.50 COMPZI CASING PULD P LD liner setting tools BHA# 19 44.2 0.0 01:45 02:15 8/27/2017 8/27/2017 0.50 PROD2 STK PULD P PU/MU kickoff/drilling BHA# 20 0.0 78.3 02:15 02:45 w/Hycalog C1 bi-center bit and agitator, surface test BHI Coiltrak tools (go test) 8/27/2017 8/27/2017 1.50 PROD2 STK TRIP P Tag up, reset counters, RIH, pumping 78.3 6,480.0 02:45 04:15 min rate 8/27/2017 827/2017 0.50 PROD2 STK CTOP T Tighten INJH coupler 6,480.0 6,480.0 04:15 04:45 8/27/2017 8/27/2017 0.90 PROD2 STK TRIP P Continue RIH 6,480.0 12,595.0 04:45 05:39 8/27/2017 8/27/2017 0.20 PROD2 STK DLOG P Log K1 correction of+5.5 12,595.0 12,620.0 05:39 05:51 8/27/2017 827/2017 0.10 PRO02 STK TRIP P Continue in well 12,620.0 12,700.0 05:51 05:57 8/27/2017 8/27/2017 1.70 PROD2 STK CIRC P Displace well back to 8.8 PPG 12,700.0 12,700.0 05:57 07:39 PwrPro, close EDC, PUW=46K 8/27/2017 827/2017 0.50 PROD2 STK TRIP P Continue in well, Clean pass through 12,700.0 13,232.0 07:39 08:09 window, Dry tag liner top billet @ 13232 8/27/2017 827/2017 0.70 PROD2 STK MILL P PUH, Bring on pumps @ 1.76 BPM@_ 13,232.0 13,233.0 08:09 08:51 5350 PSI FS, BHP=3940. See motor work and DHWOB @ 13232, Mill @ 1 FPH 8/27/2017 8/27/2017 0.60 PROD2 STK MILL P Go to 2 FPH time milling 13,233.0 13,234.0 08:51 09:27 8/27/2017 8/27/2017 0.40 PROD2 STK MILL P. Go to 3 FPH time milling 13,234.0 13,235.0 09:27 09:51 8/27/2017 8/27/2017 0.80 PROD2 DRILL DRLG P 12235', Start drilling ahead, Had one 13,235.0 13,270.0 09:51 10:39 stall, reset and drill, 1.75 BPM @ 5350 PSI FS, BHP=3873 8/27/2017 8/27/2017 0.20 PROD2 DRILL WPRT P PUH to dry drift billet area, Set down 13,270.0 13,270.0 10:39 10:51 @ 13237, PUH then run through clean 8/27/2017 8/27/2017 3.40 PROD2 DRILL DRLG P 13270', Drill, 1.73 BPM @ 5400 PSI 13,270.0 13,660.0 10:51 14:15 FS, BHP=3927 8/27/2017 8/27/2017 0.40 PROD2 DRILL WPRT P 13660, Wiper to 13250, PUW=44K 13,660.0 13,660.0 14:15 14:39 8/27/2017 8/2712017 1.00 PROD2 DRILL DRLG P 13660', Drill, 1.73 BPM @ 5680 PSI 13,660.0 13,722.0 14:39 15:39 FS, BHP=4022 8/27/2017 8/27/2017 0.15 PROD2 DRILL WPRT P PUW 45 k, BHA wiper 13,722.0 13,722.0 15:39 15:48 827/2017 8/27/2017 5.00 PROD2 DRILL DRLG P BOBD, 1.74 bpm at 5,681 psi FS, 13,722.0 14,064.0 15:48 20:48 BHP=5,562, WHP=9, IA=O, OA=528, CTSW=4.5 k, DHWOB=2.2 k, ROP=42 fph Page 21151 Report Printed: 912712017 Operations Summary (with Timelog Depths) -i= 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Tme End Tune Our (hr) Phase Op Code Activity Code Time P-YX Operation (fiKB) End Depth (eKB) 8/27/2017 8/27/2017 0.75 PROD2 DRILL WPRT P Wiper up hole to 13,300', PUW 44 it, 14,064.0 14,064.0 20:48 21:33 wiper back in hole, RIW=6 k 8/27/2017 8/28/2017 2.45 PROD2 DRILL DRLG P BOBD, 1.79 bpm at 6,045 psi FS, 14,064.0 14,212.0 21:33 00:00 BHP 4,074, WHP 8, IA=O, OA=528, CTSW=minus 1 k, DHWOB=1.5 it, ROP=90 fph - 14,187', DHWOB=3.5 k, CTSW=2.5 k, ROP=O, PUW 50 k, stack back down minus 15 k, PUW 72 k, pipe free, pull 200' wiper 8/2812017 8/28/2017 1.75 PROD2 DRILL DRLG P OBD, 1.73 bpm at 6,430 psi, BHP 14,212.0 14,318.3 00:00 01:45 4074, WHIP 0, IA 0, OA 532, CTSW= minus 1.7 k, DHWOB=2.2 k, ROP=55 k 8/28/2017 8/28/2017 0.25 PROD2 DRILL WPRT P Short Wiper up hole to 14,159', PUW 14,318.3 14,318.0 01:45 02:00 42 k, HOT was against the stops, rotate TF 8/28/2017 8/28/2017 1.50 PROD2 DRILL DRLG P BOBD, 1.74 bpm at 5,319 psi, BHP 14,318.0 14,460.0 02:00 03:30 4,178, WHP 0, IA 0, OA 539, CTSW=6 k, DHWOB=1.3 k, ROP=110 fph `*` New Mud at the bit 14,3331 ................ Old Mud Stats: 1,931' DF, 0.9% DS 8128/2017 8/28/2017 0.75 PROD2 DRILL WPRT P Wiper up hole for tie in, PUW 44 it 14,460.0 12,735.0 03:30 04:15 8/28/2017 8/2812017 0.15 PROD2 DRILL DLOG P Log the RA correction of plus 5.5' 12,735.0 12,753.0 04:15 04:24 8/28/2017 8/28/2017 0.70 PROD2 DRILL WPRT P RIH, RIW 11 k 12,753.0 14,460.0 04:24 05:06 8/28/2017 8/28/2017 3.80 PROD2 DRILL DRLG P BOBO, 1.75 bpm at 5595 PSI FS, 14,460.0 14,700.0 05:06 08:54 BHP=4039, Pump 10 BBI beaded pill to evaluate weight transfer @ 14692. No difference. Surface weight @ -5K 8/28/2017 8/28/2017 3.90 PROD2 DRILL DRLG P 14700, Drill ahead1.7 BPM @ 5595 14,700.0 14,860.0 08:54 12:48 PSI FS, BHP=4120 8/28/2017 8/28/2017 0.90 PROD2 DRILL WPRT P 14860', 1000'wiper, PUW=45K 14,860.0 14,860.0 12:48 13:42 8/28/2017 8/28/2017 0.60 PROD2 DRILL DRLG P 14860', Drill, 1.7 BPM @ 6096 PSI 14,860.0 14,882.0 13:42 14:18 FS, BHP=4099. Pressure is high across BHA. Circ pressure up 500 PSI. Reduce rate to 1.6 BPM @ 5740 PSI FS 8/28/2017 8/28/2017 2.80 PROD2 DRILL TRIP T 14882, Lost differential pressure on 14,882.0 77.0 14:18 17:06 bottom, Trip out 8128/2017 8/28/2017 1.90 PROD2 DRILL PULD T PUD BHA#20, Scope change, Floats 77.0 0.0 17:06 19:00 not holding. Power up coiltrak and closed EDC. Continue pressure undeploy 8/2812017 8/28/2017 0.80 PROD2 DRILL CTOP T WU agitator to coil. Stab on well. 0.0 0.0 19:00 19:48 circulate through agitator. .5 BPM @ 1605 PSI with .SBPM out. Unstab injector and lay down agitator 8/28/2017 8/28/2017 0.40 PROD2 DRILL BOPE P Perform Bi -weekly BOPE function test 0.0 0.0 19:48 20:12 - - Good 8/28/2017 8/28/2017 1.80 PROD2 DRILL PULD T PD pre loaded BHA # 21 with .6` 0.0 62.6 20:12 22:00 motor, Re run bi center. No res tool or agitator, Surface test tool - Good. Page 22161 Report Printed: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Dep h Stag Time Ertl Titre our (hr) Wrese op Cafe Acti,4 Cada Time P -T -X Operation (ftKB) EMDepthtflKa) 8128/2017 8/28/2017 1.50 PROD2 DRILL PULD T Identified hydraulic leak on lower 62.6 0.0 22:00 23:30 shear / seal actuator, PJSM, PUD BHA #21, Nabors Tool Pusher dispatched mechanic to repair acctuator. 8/282017 8/29/2017 0.50 PROD2 DRILL EQRP T Prep for hydraulic leak repair, vac out 0.0 0.0 23:30 00:00 fluid in stack, lockout/tagout koomey unit. 8/29/2017 8129/2017 2.50 PROD2 DRILL EQRP T Continue repairing leak on lower blind 0.0 0.0 00:00 02:30 shear ram actuator "' Total Nabors NPT 4.5 hrs 8/29/2017 8129/2017 1.15 PROD2 DRILL PULD T PJSM, PD drilling BHA# 21 0.0 62.5 02:30 03:39 8/292017 8/29/2017 2.25 PROD2 DRILL TRIP T RIH, with cleanout/confirm TD BHA# 62.5 12,595.0 03:39 05:54 21 with a 0.6° ako motor and no res tool. 829/2017 8/29/2017 0.15 PROM DRILL DLOG T Log K1 marker correction of plus 5.5' 12,595.0 12,621.0 05:54 06:03 8/29/2017 8/29/2017 1.00 PROD2 DRILL TRIP T Continue RIH 12,621.0 14,882.0 06:03 07:03 8/292017 8/292017 0.50 PROD2 DRILL CIRC P Confirm TD, line up and pump liner -. 14,882.0 14,882.0 07:03 07:33 pill, jogging pipe close to bottom 8/292017 8129/2017 3.00 PROD2 DRILL TRIP- P POOH while laying in 12.0 ppg liner 14,882.0 62.2 07:33 10:33 running pill with alpine beads, PUW 44 k, painting EOP flags 829/2017 8/29/2017 0.50 PROD2 DRILL OWFF P At surface, check well for flow (no- 62.2 62.2 10:33 11:03 1 flow), PJSM 8/29/2017 8/29/2017 0.50 PROD2 DRILL PULD P LD cleanout/confmn TD BHA# 21 on a 62.2 0.6- 11:03 11:33 1 dead well 8292017 8/29/2017 0.25 COMPZ2 CASING PUTS P Prep rig floor for PU liner assembly, 0.0 0.0 11:33 11:48 1 PJSM 8/2912017 8129/2017 3.25 COMPZ2 CASING PULD P MU AL1 Liner assembly, check BHI 0.0 1,710.5 11:48 15:03 check valves and pac-offs 8/29/2017 8/29/2017 0.75 COMPZ2 CASING PULD P PU/MU BHI CoilTrak tools, surface 1,710.5 1,776.3 15:03 15:48 test tools (good test) 8/29/2017 8/29/2017 2.40 COMPZ2 CASING RUNL P RIH, with AL1 liner assmebly BHA# 22 1,776.3 12,573.0 15:48 18:12 8/292017 8292017 0.90 COMPZ2 CASING RUNL P Wt Check 43 k lbs, tie into window flag 12,573.0 14,597.0 18:12 19:06 for 2.42' correction. continue to RIH. SD @ 14,597', PU 52 k lbs, -10.9 k - WOB, continue to RIH. 8/29/2017 8/29/2017 0.10 COMPZ2 CASING RUNL P tie into flag while driving by for no 14,597.0 14,882.0 19:06 19:12 corection. SD @ 14883', stacked - 10k CT wt 2.6 k WOB 2.78k lbs. stage pump up to 1.5 bpm, CT 4321 psi. PU,Ct wt broke over at 38k lbs, WOB-3.471k lbs. Released liner.bottom 14882' TOB 13150. 8/29/2017 829/2017 1.90 COMM CASING TRIP. P Reset counters, POOH replacing pipe 14,882.0 70.0 19:12 21:06 voydage w KW. Open EDC once in caseed hole. continue to POOH. 8/29/2017 8/29/2017 0.70 COMPZ2 CASING PULD P PJSM, at surface, flow check - Good, 70.0 0.0 21:06 21:48 unstab injector, Examine pipe, flat spot -24' back 0.13", @ - 17' back 0.90". Decision made to cut pipe / rehead. LD BHA # 22 over a dead well. Page 23161 Report Printed: 9 /2 712 01 7 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stad Depth Start Time End Time our (hr) Phase Op Code Ackvity Code Time P-T-X Operation (HKa) End Depth ME) 8/2912017 8/30/2017 2.20 COMPZ2 CASING CTOP P Cut 30' of pipe and reread, pull test to 0.0 0.0 21:48 00:00 38k lbs - good, install upper Quick, PT to 4k psi - good. 8/3012017 8/30/2017 1.20 PRODS STK PULD P PJSM, PU and deploy BHA #23, AL2 0.0 70.0 00:00 01:12 let drilling assembly, over a dead well. Stab injector, bump up, set counters 8/30/2017 8/30/2017 2.60 PRODS STK TRIP P RIH, shallow test agitator, came on 70.0 12,595.0 01:12 03:48 above 1 bpm, open EDC, continue to RIH. Bakerdrillingscreenjumped from - 7000 feet to 13,000 feet for no known reason. MWD cycled equipment and reset depths. 8/30/2017 8/30/2017 0.20 PRODS STK DLOG P Tie into K1 for+4' correction 12,595.0 12,633.0 03:48 04:00 8/30/2017 8/30/2017 1.25 PRODS STK DISP P Pull above TOC, open EDC, circ out 12,633.0 12,633.0 04:00 05:15 12.0 kill weight fluid. 8/30/2017 8/30/2017 0.25 PRODS STK TRIP P RIH, drytag TOB at 13,150', PUH, 12,633.0 13;150.0 05:15 05:30 PUW 37 k 8/30/2017 8/3012017 2.50 PRODS STK KOST P Bring pump on 1.81 bpm at 5,215 psi, 13,150.0 13,157.0 05:30 08:00 BHP 3,966, WHP 8, IA 0, OA 334, CTSW=12 k, DHWOB=0.4 k, kickoff billet as per RP, Dry drift billet area . clean 8/30/2017 8130/2017 4.50 PRODS DRILL DRLG P Drilling ahead, 1.8 bpm at 5,565 psi, 13,157.0 13,484.0 08:00 12:30 BHP 3,988, WHP 0, IA 0, OA 417, CTSW=7 k, DHWOB=2.6 k, ROP=80- 120 fph 8/30/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper up hole to 12,750', PUW 50 k 13,484.0 12,750.0 12:30 13:00 8/30/2017 8/30/2017 0.50 PRODS DRILL WPRT P Wiper back in hole, RIW 7 k 12,750.0 13,484.0 13:00 13:30 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P BOBD 1.8 bpm at 5,235 psi FS, BHP 13,484.0 13,700.0 13:30 16:30 3,959. WHP 0, IA 0, OA 454, CTSW=3.6 k, DHWOB=2.6 k, ROP=40 fph 8/30/2017 8/30/2017 1.50 PRODS DRILL DRLG P OBD 1.8 bpm at 5,377 psi, BPH 13,700.0 13,795.0 16:30 18:00 4,043, WHP 0, IA 0, OA 485, CTSW=7 k, DHWOB=1.9 k, ROP=33 fpr 8/3012017 8/30/2017 2.20 PRODS DRILL DRLG P OBD stall, PU Wt 52 k ran kon 13,795.0 13,875.0 18:00 20:12 something hard, ROP down to - 3 ft/hr, low diff, WOB - 3 k lbs, @ 1381 1'started to drill off, getting diff presure back. ROP increased after 13,814', caught bottoms up sample, lots of siderite 8/30/2017 8/3012017 0.30 PRODS DRILL WPRT P PU Wt 43 k lbs, Geo wiper, believe we 13,875.0 13,660.0 20:12 20:30 crossed fault, 8/30/2017 8/3012017 0.30 PRODS DRILL WPRT P RBIH, SID 13,810', short PU clean, 13,660.0 13,875.0 20:30 20:48 rolled toolface to as drilled- 310 ROHS, SO again 13,816', 3 k lbs, short Pu clean, RBIH still 330'ROHS, reduced rale to 0.3 BPM, slid right through. Page 24151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) -: , --=- ) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stall Depth Star) rima End Time our (hr) Phase Dip Code Activity Code Time P -T -X Operation (MB) End Depth (WB) 8/30/2017 8/30/2017 3.00 PRODS DRILL DRLG P 1.79 bpm in, 1.70 bpm out, Ct 5350 13,876.0 13,971.0 20:48 23:48 psi, free spin diff 1000 psi, CT RIH wt 9k. OBD, WOB 1.5 k lbs, CT wt 6.5 k lbs, ROP 30 ft/hr. Pumped 5 x 5 sweep pre wiper tirp CT wt -2.9 k lbs, 1 k lbs WOB, ROP 45 ft/hr 8/30/2017 8/31/2017 0.20 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2-770' 13,971.0 13,512.0 23:48 00:00 chasing sweeps uphole. 8/31/2017 8/31/2017 0.10 PRODS DRILL WPRT P PU Wt 43 k lbs, Wiper #2-770' 13,512.0 13,200.0 00:00 00:06 chasing sweeps uphole. 8/31/2017 813112017 0.30 PRODS DRILL WPRT P RBIH, RIH Wt 7 k Its, RIH Wt 8 k 13,200.0 13,971.0 00:06 00:24 8/31/2017 8/31/2017 3.80 PRODS DRILL DRLG P 1.81 bpm in, 1.72 bpm out, Et 5480 13,971.0 14,078.0 00:24 04:12 psi, free spin diff 1010 psi -. OBD, CT wt 4 k lbs, WOB 2 k lbs. ROP 58 Mr. Excess surface weight short lived. CT weight fell to -3 k lbs w 2 k WOB in 20 min, ROP 30-15 it/ hr 8/31/2017 8/31/2017 0.20 PRODS DRILL WPRT P PU Wt 42 k lbs, Wipe 100' 14,078.0 14,078.0 04:12 04:24 8/31/2017 8/31/2017 2.00 PRODS DRILL DRLG P 1.82 bpm in, 1.78 bpm out, CT wt 6 k 14,078.0 14,111.0 04:24 06:24 lbs, WOB 1.8 k lbs. CT weight fell quicly to -4 klbs. ROP —16 ft/hr 8/31/2017 8/31/2017 0.15 PRODS DRILL WPRT P BHA wiper PUW 47k 14,111.0 14,111.0 06:24 06:33 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P BOBD, 1.8 bpm at 4,886 psi, BHP 14,111.0 14,189.0 06:33 10:48 4,093, WHP 0, IA 0, OA 567, CTSW= minus 5 it. DHWOB=1.8 k, ROP 15 fph, start new mud down coil 8/31/2017 8/31/2017 4.25 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,950 psi, BHP 14,189.0 14,280.0 10:48 15:03 3,965, WHP 0, IA 0, OA 568, CTSW= minus 5.9 k, DHWOB=1.3 k, ROP 15- 28 fph "O" New mud at the bit 14,189' 8/31/2017 8/3112017 0.75 PRODS DRILL WPRT P Wiper up hole for tie in. PUW 45 k, 14,280.0 12,595.0 15:03 15:48 14,100' pull heavy 73 k 8/31/2017 8/31/2017 0.15 PRODS DRILL DLOG P Log the K1 correction of plus 7.5', seat 12,595.0 12,626.0 15:48 15:57 pump 8/31/2017 8/31/2017 1.00 PRODS DRILL WPRT . P RBIH, Work through tight area @ 12,626.0 14,270.0 15:57 16:57 14,100 8/31/2017 8/31/2017 0.70 PRODS DRILL WPRT T PU to clean up tight section. Stuck 14,270.0 12,691.0 16:57 17:39 multiple times 14,100 - 14,000'. Stack negative down, Pull 75 ft/min, up to 78k surface weight, 44 k was clean pick up. Able to pull free. Pump multiple 5x5 sweeps. Weights clenaed up above the fault @ 13,800. Page 25/51 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 .o Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Stad Time EndrM Dur(hr) Phase Op Code Aclivdy Cade Tim P -T -X Operation (KKB) End DOMCKKB) 8/31/2017 8/31/2017 1.00 PROD3 DRILL CIRC T Open EDC, pumping 1.84 bpm, as the 12,691.0 12,670.0 17:39 18:39 bottoms up landed from when we war stuck large amounts of cuttings returned to the shaker. No rocks, all fines. All twenty valleys on the shaker full to the top. Sweeps landed and solids returns were greatly deminished from previous. Pump two more sweeps timed out for clean out run. PU Wt 44 k lbs. Close EDC 8/31/2017 8/31/2017 0.40 PRODS DRILL WPRT T RBIH, 12,670.0 13,807.0 18:39 19:03 8131/2017 8/31/2017 2.50 PRODS DRILL WPRT T Pu Wt 45k His, Pull out of hole wiping 13,807.0 78.0 19:03 21:33 - to the window chasing sweeps to surface. Open EDC. Contiue out of hole chasing sweeps. Called our Baker tool hand w billet and open hole anchors 8/31/2017 8/31/2017 1.50 PRODS DRILL PULD T Bump up, PUD BHA# 23. 78.0 0.0 21:33 23:03 8/31/2017 9/1/2017 0.95 PRODS STK PULD T PU & PD BHA #24 0.0 78.0 23:03 00:00 9/1/2017 9/1/2017 1.50 PRODS STK PULD T Crew Change, PJSM, contiune to PU 0.0 78.0 00:00 01:30 & PD BHA #24 9/1/2017 9/1/2017 2.90 PRODS STK TRIP T Bump up, set counters, RIH w 78.0 12,610.0 01:30 04:24 anchored billet. 9/1/2017 9/1/2017 0.20 PRODS STK DLOG T Tie into the K1 for +6' correction 12,607.0 12,633.0 04:24 04:36 9/1/2017 9/1/2017 0.70 PRODS STK TRIP T Pu Wt 42 k His, SID pumps, close 12,633.0 13,347.0 04:36 05:18 EDC. Continue to RIH, SID multiple times 13,272', 3k lbs bounced through 13,329', 3k lbs bounced through 13,347', 4.6 k PU Wt 44 k 20-25 fi/min 13,347', 4.8 k PU Wt 48 k 13,347', 4 k PU Wt 50 k Orient slip to as drilled, 240° ROHS SID 13,345' 3k PU Wt 48k 9/1/2017 9/1/2017 0.40 PRODS STK TRIP T PUH, 13,347.0 12,669.0 05:18 05:42 9/1/2017 9/1/2017 0.75 PRODS STK WAIT T Open EDC, maintain bottom hole 12,669.0 12,562.0 05:42 06:27 pressure. while creeping up hole, waft on orders for new seltimg depth 9/1/2017 9/1/2017 0.35 PROD3 STK TRIP T Close EDC, RIH notice counters not 12,562.0 12,562.0 06:27 06:48 working, RIH for tie in 9/1/2017 9/1/2017 0.25 PROD3 STK DLOG T Log the Kt correction of plus 36.5' 12,562.0 12,642.0 06:48 07:03 9/1/2017 9/1/2017 0.50 PROD3 STK WAIT T Confer with town team on billet setting 12,642.0 12,642.0 07:03 07:33 depth 9/1/2017 9/1/2017 3.25 PRODS STK TRIP T POOH, for cleanout run, (a3 500' PJSM 12,642.0 73.3 07:33 10:48 for PUD Billet BHA# 24 9/1/2017 9/1/2017 1.25 PRODS STK PULD T PUD, Billet BHA# 24 73.3 0.0 10:48 12:03 9/1/2017 9/112017 0.75 PROD3 DRILL WAIT T Wait on Concretion Bit via/KDTH 0.0 0.0 12:03 12:48 9/1/2017 9/1/2017 1.25 PRODS DRILL PULD T PJSM, PD cleanout/drill BHA# 25 0.0 78.2 12:48 14:03 Page 26151 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Titus Log De Start De) start Time End Time Our (hr Phase Op Curie Atliv'M1y Cotle Time P -T -x Operation (n EW Depth (flKB) 9/1/2017 9/1/2017 2.50 PROD3 DRILL TRIP T RIH, w/cleanout BHA# 24 78.2 12,600.0 14:03 16:33 9/1/2017 9/1/2017 0.20 PROD3 DRILL DLOG T Tie into the K1 for a +5.5' correction 12,600.0 12,630.0 16:33 16:45 9/1/2017 9/1/2017 0.40 PROD3 DRILL TRIP T Wt Ck 40 k lbs, coninue to RIH 12,630.0 13,300.0 16:45 17:09 9/1/2017 9/1/2017 0.70 PROD3 DRILL REAM T 1.80 bpm, C14800 psi, free spin diff 13,300.0 13,819.0 17:09 17:51 830 psi. S/D @ 13,819'stack weight w motor work. PU 43 k lbs, sticky, started 5x5 sweep. RBIH 9/1/2017 9/1/2017 0.20 PROD3 DRILL REAM T 1.80 bpm, CT 4861, psi, free spin 819 13,819.0 13,700.0 17:51 18:03 psi, RIH wt 10 k Ibs Tag up 13,813', work at 3 fUmin to 13,826' PU 40k lbs, some neg WOB, motor work Crew change 9/1/2017 9/1/2017 1.60 PROD3 DRILL REAM T RBIH S/D @ 13,814 drilled off, 13,700.0 13,837.0 18:03 19:39 continue to RIH, pumping 5x5 sweeps one in as one exits the nozzle. Drill to 13,830'3+ k WOB, PU 47k wipe to above the fault, lots of silt at the shaker RBIH, S/D at 13,814 work past, 13,834' hard bottom +3 k WOB, Work slowly to 13,837, +3k WOB, PU 58 k, wipe to above fault, RBIH Consult w/ town. Scope change to prep for billetlopen hole side track 9/1/2017 9/1/2017 0.60 PROD3 DRILL WPRT T PU 47k, PUH as 5x5 sweep exiting 13,837.0 12,550.0 19:39 20:15 the nozzle, to above TOC, questions re. TOC in tubing, under reamed from 12,559' up ( tagged w underreamer @ 12,569) and drilled pilot hole from 12,588 down. Open EDC, 9/1/2017 9/1/2017 0.90 PROD3 DRILL CIRC_ T Increase rate to 2.22 bpm, watch two 12,550.0 12,606.0 20:15 21:09 sweeps land on the shaker, solids greatly reduced on the second. Loaded another 5x5 sweep in the coil . and closed EDC 9/1/2017 9/1/2017 0.20 PROD3 DRILL DLOG T Log K1 for +5.5'correction 12,606.0 12,628.0 21:09 21:21 9/1/2017 9/1/2017 0.20 PROD3 DRILL WPRT T RIH pumping sweeps. 12,628.0 13,700.0 21:21 21:33 9/1/2017 9/1/2017 0.80 PROD3 DRILL WPRT T Pu Wt 39 k lbs, PUH slowly timing out 13,700.0 12,550.0 21:33 22:21 sweeps. continue to POOH chasing sweeps to surface. Saw slight/brief motor work @ 12,780' just below the window, RBIH, PUH, clean. Park and open EDC. 9/1/2017 9/2/2017 1.65 PROD3 DRILL WPRT T Continue to POOH pumping 2.27 bpm 12,550.0 3,400.0 22:21 00:00 9/2/2017 9/2/2017 0.80 PROD3 DRILL WPRT T Continue to POOH pumping 2.27 bpm 3,400.0 83.0 00:00 00:48 9/2/2017 9/2/2017 1.30 PROD3 DRILL PULD T Tag up, space out, PJSM, PUD & LD 83.0 0.0 00:48 02:06 BHA #26. 9/2/2017 9/2/2017 1.30 PROD3 STK PULD T PU & PD BHA # 26, anchored billet, 0.0 83.0 02:06 03:24 check pack offs - replace. Page 27151 Report Printed: 9127120171 . Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time End Time our(hr) Phase Op Code A dy Code Tim P-T.X Operation (ftKB) End Depth(W(B) 9/2/2017 9/2/2017 2.45 PRODS STK TRIP T RIH 83.0 12,610.0 03:24 05:51 9/2/2017 912/'2017 0.15 PRODS STK DLOG T Log the K1 correction plus 9 ft 12,610.0 12,624.0 05:51 06:00 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Continue RIH 12,624.0 13,374.0 06:00 06:15 9/2/2017 9/2/2017 0.25 PRODS STK TRIP T Small bobble @ 13,347', set down 3 13,374.0 13,374.0 06:15 06:30 times, setting down 4 k=DHWOB, PUW=48 k, 9/2/2017 9/2/2017 0.50 PRODS STK WAIT T Call Town Engineer, for plan forward. 13,374.0 13,498.0 06:30 07:00 decision was made to attempt to push past ledge/debris in hole, set down 4.7 k, PUW=52, RBIH @ 40 fpm, popped thru, continue RIH' 9/2/2017 9/2/2017 1.00 PROD3 STK TRIP T Continue RIH, set down 4.7 it, 13,498.0 13,498.0 07:00 08:00 PUW=52 k, try and work billet down 13 limes, setting down 4-6 k, max PUW= 60 k (sticky), max set down weight 6.5 k DHWOB, AP=dropping to 3,342 psi, bring annular pressure back up to MP 4,058 psi with no success in getting past 13,498' 9/2/2017 9/2/2017 0.25 PRODS STK WPST T Call Town Engineer, plan forward set 13,498.0 13,475.0 08:00 08:15 Estimated TOB at 13,475', Anchor set @ 30 ROHS. Bring pump up to 4,241 psi, tool shifted showing 1.7 k DHWOB, set down additional 1.5 k, PUW=47 k 9/2/2017 9/2/2017 2.50 PRODS STK WPST T POOH, pumping 1.0 bpm at 2773 psi, 13,475.0 73.3 08:15 10:45 filling in trip sheet, PJSM @ 750' from surface 9/2/2017 9/2/2017 1.15 PRODS STK PULD T Tag up at surface, space out, PUD & 73.3 0.0 10:45 11:54 LD BOT Setting tools 9/2/2017 9/2/2017 1.25 PRODS STK PULD T PD kickoff/drilling BHA# 27 0.0 78.3 11:54 13:09 9/2/2017 9/2/2017 0.50 PRODS STK SVRG P PJSM, w/crew and Hydra -Rig rep, 78.3 78.3 13:09 13:39 measuring goose neck A - frame..... When stabbed on to stump. 9/2/2017 9/2/2017 2.00 PROD3 STK TRIP T Tag up, zero counters, RIH following 78.3 12,610.0 13:39 15:39 MP schedule, filling trip sheet every 1000% test agitator at 308', (working) 9/2/2017 9/2/2017 0.25 PROD3 STK DLOG T Log the K1 marker correction of plus 12,610.0 12,620.0 15:39 15:54 4.5', PUW=40 it 9/2/2017 9/2/2017 0.35 PROD3 STK TRIP T Continue RIH, RIW=13 k 12,620.0 13,480.0 15:54 16:15 9/2/2017 9/2/2017 2.00 PRODS STK KOST T Dry tag TOB, bring pump up to 1.8 13,480.0 13,483.0 16:15 18:15 bpm at 5,238 psi FS, BHP 3,968, WHP 0, IA 0, OA 253 9/2/2017 9/2/2017 0.90 PRODS STK KOST T 1.80 bpm, targeting 0.5-1 k WOB, 13,483.0 13,495.0 18:15 19:09 @ 13,483' ROP 3 ft/hr, WOB -.661k lbs @ 13,485' increased ROP to 5.5 ft/hr- WOB 0.8 k lbs @ 13,486 increased ROP to 12 ft/hr- WOB 0.3 k lbs @13,487' chasing it, 15 ft/min, WOB 1 k lbs Page 28151 Report Printed: 9/2 712 01 7 min Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stmt Depth Start Time End Time Cur hr ( ) Phase Op Cale Activity Cotle Time P -T-% Operation (N(8) Entl Cepih (MKe) 9/2/2017 9/2/2017 0.40 PROD3 STK TRIP T Drilling ahead, 130-30 ff/hr, lost depth 13,495.0 13,508.0 19:09 19:33 tracking. '" Note WOB started falling off at 19:19 right when the depth counter apears to have failed. 9/2/2017 9/2/2017 1.10 PROD3 STK TRIP T PU 38k lbs, mechanical @ 13,444', 13,508.0 12,734.0 19:33 20:39 jog slowly in 10 foot interval. Effect repair and pull slowly up hole, reduce pump rate "best guess' where we think TOB is. Bring rate back up continue up hole logging to RA tag. See pip tag on the drive by 9/2/2017 9/2/2017 0.20 PROD3 STK DLOG T RBIH log RA tag for +7' correction 12,734.0 12,753.0 20:39 20:51 9/212017 9/2/2017 0.20 PROD3 STK TRIP T RIH, 12,753.0 13,497.0 20:51 21:03 9/2/2017 9/2/2017 0.40 PROD3 STK DLOG T SID @ 13,497, PU, RBIH, bounce 13,497.0 13,598.0 21:03 21:27 through. Continue to RIH logging from 13,508 down. Drive past suspect bottom, park at 13,532' survey- suspect in original hole. reduce pumps to min rate attempt to tag bottom. Survey @ 13,564' same results, in old hole Turn around at 13,598' - 9/2/2017 9/2/2017 1.20 PRODS STK WPRT T Pump 5x5 sweep, PU, POOH toward 13,598.0 12,544.0 21:27 22:39 the window wiping hole. Pump another 5x5 sweep Make 2 up down passes, LS on up, HS on down from 13,430 - 13,300' in attempt to clean up the previous trouble spot. Continue to POOH. 9/2/2017 9/3/2017 1.35 PROD3 STK WPRT T Open EDC, POOH pumping 2.2 bpm 12,544.0 4,693.0 22:39 00:00 chasing sweeps. 9/3/2017 9/3/2017 1.30 PROD3 STK WPRT T Continue to POOH. Packed off the 4,693.0 78.0 00:00 01:18 MM while tripping, bypass same and contiue out of hole. Jog near surface. 9/3/2017 913/2017 1.50 PROD3 STK PULD T Bump up, space out, PUD, 78.0 0.0 01:18 02:48 -Bit had 7 of 10 total side ( reaming ) cutters severely damaged ***Bit graded 1-7 9/3/2017 9/3/2017 1.50 PRODS STK PULD T PU and PD BHA # 28, Aluminum billet 0.0 73.0 02:48 04:18 w open hole anchors, bump up, set counters, pumps on at min rate, 9/3/2017 - 913/2017 2.50 PROD3 STK TRIP T RIH, close EDC, contiue to RIH 73.0 12,610.0 04:18 06:48 913/2017 9/3/2017 0.20 PROD3 STK DLOG T Tie into K1 for plus 4.0' Correction, 12,610.0 12,632.0 06:48 07:00 PUW 42 k 9/3/2017 9/3/2017 0.50 PRODS STK TRIP T Continue IH 12,632.0 13,426.0 07:00 07:30 9/3/2017 9/3/2017 0.25 PROD3 STK WPST T At depth, PUW=43 k, RBIH to 13,426.0 13,415.0 07:30 07:45 13426.8' PUH 39 k, bring pump online 0.45 bpm, tool sheared at 4,800 psi, 9/3/2017 9/3/2017 2.15 PROD3 STK TRIP T POOH, PJSM @ 750' from surface 13,415.0 61.2 07:45 09:54 Page 29151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start TM ane End Time Owes) Phase Op Code Activity Code Time P -T -X Ope n (ftKB) End Dep (WO) 9/3/2017 9/3/2017 0.80 PRODS STK PULD T PUD BOT setting tools 61.2 0.0 09:54 10:42 9/3/2017 9/3/2017 0.25 PRODS STK PULD T LD BOT tools 0.0 0.0 10:42 10:57 9/3/2017 9/3/2017 1.00 PRODS STK PULD T PU/MU AL2 kickoff/drilling BHA, 0.0 78.3 10:57 11:57 surface test tools (good -test) 9/3/2017 9/3/2017 2.00 PRODS STK TRIP T Tag up, zero counters, RIH w/AL2 78.3 12,610.0 11:57 13:57 kickoff/drilling BHA# 29 913/2017 9/3/2017 0.15 PRODS STK DLOG T Log K1 marker correction of plus 4.0' 12,610.0 12,716.0 13:57 14:06 9/3/2017 9/3/2017 0.50 PRODS STK TRIP T Continue IH 12,716.0 13,415.0 14:06 14:36 9/3/2017 9/3/2017 2.00 PRODS STK KOST T Dry tag TOB, PUW 40 k, bring pump 13,415.0 13,425.0 14:36 16:36 on-line 1.8 bpm at 5,124 psi, BHP 3,934, WHP 0, IA 0, OA 275, CTSW=11.3 it, DHWOB=0.15 k, Kickoff Billet as per RP, 20'ROHS 9/3/2017 9/3/2017 2.00 PRODS DRILL DRLG T Start drilling formation 1.8 bpm at 13,425.0 13,750.0 16:36 18:36 5,719 psi, BHP 3,932, WHIP 0, IA 0, OA 386, CTSW=8 k, DHWOB=1.6 k, ROP 67 fph Stalled, PU and dry drifted billet clean PU @ 13,537'to get restarted, 43 K lbs BOBD 130-155 ft/hr, Pump 5x5 @ 13,672' drilling @ 150 R/hr, Ct Wt Ok lbs, 1.73 k Ibis Sweeps start exiting the nozzle @ 13,746', staged a 10 bbl Hi vis sweep in the coil to time out below the window. 9/3/2017 9/3/2017 1.70 PROD3 DRILL WPRT T Pu, Wt 44 klbs 13,750.0 13,360.0 18:36 20:18 PUH chasing sweeps. Pull 50 k lbs @ 13,460, tum around, S/D, PU, pump min rate, RBIH, SID, PU, RBIH Bounce through, continue in hole 13,650, PU WL 44 k PUH @ 30 fttmin pumping 1.8 bpm, sweeps exit at 13,480'. Small neg WOB @ 13460'. turn around 13,438' RBIH @ 1.0 bpm. saw a little WOB spike at 13,4683, other than that clean PU 43k, PUH, saw a little neg WOB again @ 13,460' Pulled past billet, 44 k clean, saw 48 k CT wt as we drug by with a -1 k WOB spike. 9/3/2017 9/3/2017 2.50 PRODS DRILL TRIP T Continue to POOH. 13,360.0 74.0 20:18 22:48 Open EDC above TOC, increase pump rate from 1.8 to 2.2 bpm Continue to POOH 9/3/2017 9/4/2017 1.20 PRODS DRILL PULD T Bump up, space out, PUD BHA #29, 74.0 0.0 22:48 00:00 UDsame 9/4/2017 9/4/2017 0.40 PRODS DRILL PULD T Continue to lay down BHA #29 0.0 0.0 00:00 00:24 Page 30/51 Report Printed: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase WCode Activit' Coda Tine P -T -X Operation (ftKB) End Depth(flKB) 9/4/2017 9/4/2017 3.60 FROM DRILL RURD P Prep to lest BOPS 0.0 0.0 00:24 04:00 PU nozzle, stab injector, jet stack, (rolling coil to fresh water while jetting stack), Un Stab injector, central shops grease tree valves, Nabors crew grease stack. and/choke valves, Test inner reel iron low/ high good. install night cap, 9/4/2017 9/4/2017 2.00 FROM WHDBOP BOPE P PJSM, Flood up BOP stack, Start test 0.0 0.0 04:00 06:00 @ ( 4:00) Witness of test by AOGCC - Bob Nobel. 250 psi low 14200 psi High. test #1 Swab 2, - pass Test #2 Lower Blind shear, TV2 - pass Test #3 BOP TVI - Test #4 Upper blind shear, B1,&5 C4,5,8,&12, R1, bleeder 1 Test#5 C3,6,7,&11,62&6, T2 9/4/2017 9/4/2017 8.00 FROM WHDBOP BOPE P Crew change, PJSM, conbue BOP 0.0 0.0 06:00 14:00 testing, sim-ops - replace coupler pn motor #11, right angle drive motors on INJH, "" BOP test Complete 14:00 (10 hrs TT), 2 fail/pass, R3 grease and function (retest good) and Koomey # 1 accumulator pump failed, changed out contactor, (retest good) 9/4/2017 9/4/2017 0.65 FROM DRILL DISP P Stab INJH onto stump, circulate coil to 0.0 0.0 14:00 14:39 drilling Buid.Unstab INJH, move cart back 9/4/2017 9/4/2017 1.75 FROM DRILL PULD T PU/PD pre -loaded BHA# 30 0.0 78.3 14:39 16:24 9/4/2017 9/4/2017 0.25 FROM DRILL PULD T Stab INJH, surface test Coiltrak tools 78.3 78.3 16:24 16:39 (good -test), tag up, zero counters 9/4/2017 9/4/2017 2.00 FROM DRILL TRIP T RIH, w/ AL2 drilling BHA# 30 78.3 - 12,595.0 16:39 18:39 w/agitator and RR bi-center bit 9/4/2017 9/4/2017 0.15 FROM DRILL DLOG T Log the K1 marker correction of plus 12,595.0 12,632.0 18:39 18:48 8.5' 9/4/2017 9/4/2017 0.25 FROM DRILL TRIP T Continue IH 12,632.0 13,750.0 18:48 19:03 914/2017 9/4/2017 1.50 FROM DRILL DRLG T OBD, 1.8 bpm at 4,875 psi FS, BHP 13,750.0 13,862.0 19:03 20:33 3,996, WHIP 0, IA 0, OA 364, CTSW=9 k, DHWOB=1.7 k, ROP 69 fph 9/4/2017 9/4/2017 0.15 FROM DRILL WPRT T BHA wiper, PUW 44 k 13,862.0 13,862.0 20:33 20:42 9/4/2017 9/4/2017 2.00 FROM DRILL DRLG T BOBD, 1.75 bpm at 4,888 psi FS, 13,862.0 13,976.0 20:42 22:42 BHP 9,994, WHIP 0, IA 0, OA 365, CTSW=1.5 it, DHWOB=1.4 k, ROP 50 -69 fph, pump 5x5 sweep 914/2017 9/4/2017 0.25 PROD3 DRILL WPRT T Sweep at bit, wiper up hole, PUW 44 k 13,976.0 13,750.0 22:42 22:57 9/4/2017 9/4/2017 0.15 PRODS DRILL WPRT T Wiper back IH, RIW 10 k 13,750.0 . 13,976.0 22:57 23:06 9/4/2017 9/5/2017 0.90 FROM DRILL DRLG T BOBD, 1.75 bpm at 4,797 psi FS, 13,976.0 14,053.0 23:06 00:00 BHP 3,996, WHIP O, IA O. OA 371, CTSW=minus 2k, DHWOB=1.7 k, ROP=50 fph Page 31151 Report Printed: 9/27/2017 .` Operations Summary (with Timelog Depths) 3M-27 ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tifiie Log Start Depth Stan Time End Time our (m) Phase Op Code Activity Cotle Time P -T -X Operation (Wlt) End Depth (MB) 9/5/2017 9/5/2017 1.40 PRODS DRILL DRLG T OBD 1.75 bpm Ct 5000 psi, BHP 14,053.0 14,150.0 00:00 01:24 3,996, WHP 0, IA 0. OA 402, CT Wt -3 k lbs, WOB 1 k IbsROP 70 ft/hr BHA wiper at 14,072'- PU 43 K lbs BHA wiper at 14,091'- PU 45 K lbs - sent 5x5 low/hi sweep average ROP over interval drilled 70 ft/hr 9/5/2017 9/5/2017 0.40 PROD3 DRILL WPRT T Wiper#2, 700'after sweeps exit the 14,150.0 13,450.0 01:24 01:48 bit - PU Wt 40k lbs 9/5/2017 9/5/2017 0.40 PRODS DRILL WPRT T RBIH, Tight spot @ 13,850' 13,450.0 14,150.0 01:48 02:12 Swap from mud pump #2 to #1 to repair a packing leak 9/5/2017 9/5/2017 1.80 PRODS DRILL DRLG T 1.77 bpm, off bottom CT 4795 psi, diff 14,150.0 14,270.0 02:12. 04:00 944 psi, Ct RIH Wt 10 k IDS OBD, Ct wt, 8 k lbs, WOB 1.5 k lbs, ROP 70 it/ hr Drilled into something hard -14,165'3 K WOB, ROP 30 ft/hr PU & restart @ 14,165', 42 k lbs Broke through @ 14,170'- ROP 170 it/ hr WOB 1.5-2 k - short lived, settled in at 100 fUhr @ 14,199'diff fell off, PU 46 k lbs- RBIH, send 5x5 BHA wiper 100'@ 14,249' PU 43 k lbs BOBD up to 130 ft/hr w neutral coil weight and 600 lbs WOB Average ROP 67It hr Losses crept up to -- 0.1 bpm 9/5/2017 9/5/2017 2.50 PRODS DRILL DRLG P OBD, Ct wl, 2.5 k lbs, WOB 1 k lbs, 14,270.0 14,432.0 04:00 06:30 ROP 70 f f hr PU and restart @ 14,333' PU Wt 43k PU and restart @ 14,35' PU Wt 47k - pump 5x5 Average ROP 65 ft/hr 9/5/2017 9/5/2017 2.20 PRODS DRILL DRLG P OBD, Ct wl, -5 k lbs, WOB 1.0 - 0.5 k 14,432.0 14,543.0 06:30 08:42 lbs, ROP 120 - 30 ft/ hr on something hard, 14,511' pump 5x5 in anticipation of a wiper trip Averag ROP 50 ft/hr 9/5/2017 9/5/2017 0.80 PRODS DRILL WPRT P Wiper #3 after sweeps exit the bit - PU 14,543.0 12,610.0 08:42 09:30 Wt 43k Itis - 1933' Saw some motor work below the window @ 12,880' 9/5/2017 9/5/2017 0.10 PRODS DRILL DLOG P RBIH, tie into K1 for +3.5'correction 12,610.0 12,633.0 09:30 09:36 - - 9/5/2017 9/5/2017 0.80 PRODS DRILL WPRT P RBIH 12,633.0 14,543.0 09:36 10:24 WOB bobble @ 13,867', SID @ 13,914' bounced through Page 32151 Report Printed: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Tme End Trre ow (hr) Phase Op Code Activity Cade Time P-T-X Operation (ftKB) End Deph(ftKB) 9/5/2017 915/2017 4.00 PRODS DRILL DRLG - P 1.83 bpm, Ct 5140 psi, diff 980 psi 14,543.0 14,649.0 10:24 14:24 RIH Wt 4 k lbs OBD, CtWt 3.5 k lbs, WOB 1.1 k, ROP 55 Whir PU Wt43 k lbs, Swap from Pump #1 to #2 RBIH CT Wt -5 k lbs, WOB 1.36 k lbs, ROP 43 ft/hr PU to get restarted @ 14,649', 45 k lbs not much change, pump 5x5 PU as sweep exited the nozzle, PU wt 43k, 9/5/2017 9/5/2017 1.80 FROM DRILL DRLG P 1.70 bpm, free spin diff 855 psi 14,649.0 14,722.0 14:24 16:12 OBD, CtWt 4 to -5 k lbs, WOB 1 to 0.5 k, ROP 10 - 30 ft/hr _ Send sweeps, poor ROP and weight transfer PU to restart @ 14,707' , Pu Wt 46k . 50 fUhr while pill exiling then death spiral, PU Wt 50 klbs. 9/512017 915/2017 0.20 PRODS DRILL WPRT P PU Wt, 47 k IDS - 300' short wiper 14,722.0 14,503.6- 16:12 16:24 RBIH 9/512017 9/5/2017 0.60 PRODS DRILL WPRT P 1.70 bpm, Ct 4801 psi, free spin diff 14,503.0 14,722.0 16:24 17:00 860 psi, RIH Wt 3.3k BOBD, CIWt 5 k lbs, WOB 1 k, ROP 35 f thr, send 10 bbl beaded pill 9/5/2017 9/5/2017 2.50 PROD3 DRILL DRLG P Continue drilling ahead from 14,722', 14,722.0 14,795.0 17:00 19:30 performing BHA wipers as required, begin climbing to planned 94" inclination to regain sand at 14745' (as per geology) 9/5/2017 9/5/2017 3.50 FROM DRILL DRLG P OBD at 14,795', CWT=-5K-2K, 14,795.0 14,876.0 19:30 23:00 WOB =M.11 bbl/min losses, pumping beaded pills as required, increase NBI to 96% multiple BHA wipers to keep going, PUN from 14,843'= 52K (averaging — 42K - 44K). Began sending 5x5 sweeps from 14,862' in prep for WT & mud swap after exiting lower Al Silt, average ROP over interval = 23 fph 9/5/2017 9/5/2017 0.50 PRODS DRILL WPRT P Wiper up-hole, PUW = 45K 14,876.0 13,450.0 23:00 23:30 9/5/2017 9/6/2017 0.50 FROM DRILL WPRT P Wiper in-hole, clean past 13,450.0 14,200.0 23:30 00:00 13,830' (Fault #1), three 2.51K set downs at —13,869'& —13,850', PUW = 42K, reduce rate to .2 bpm & get by, set down at 13,899', again reduce to min rate & get by, RI W at 14,190'= 9.4K 9/6/2017 9/6/2017 0.20 FROM DRILL WPRT P Continue WT in-hole 14,200.0 14,876.0 00:00 00:12 1 9/6/2017 9/6/2017 2.80 PRODS DRILL DRLG P BOBD, FS = 930 psi, CWT = 1 K, 14,876.0 14,933.0 00:12 03:00 WOB = 1 K, arc pressure = 5413 psi, rate in = 1.7 bpm, began pumping new mud (System #5), new mud at the bit at 14,906', PUW = 50K from 14,907', increase rate to 1.8 bpm, experience significant vibrations, reduce rate back down to 1.7 bmp Page 33151 ReportPrinted: 912712017 Operations Summary (with Timelog L)epths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time or (hr) Phase Op Code Activity Corte Time P -T -X Operation (IIKB) End Depth (11M) 9/6/2017 9/6/2017 3.00 PRODS DRILL DRLG P Continue drilling from 14,933', rate in 14,933.0 15,018.0 03:00 06:00 = 1.7 bpm, FS = 950 psi, CWT = 5K, WOB = 1 K, continue snubbing coil, PUW = 48K from 14,941', attempt 1.5 bpm, continue to struggle with weight transfer, bring rate back up to 1.7 bpm, begin to lube up pill pit to 2% 776 (50 bbl). 9/612017 9/6/2017 4.20 PROD3 DRILL DRLG P OBD, pumped 20 bbis 2% lube pill. 15,018.0 15,118.0 06:00 10:12 Pre, coming of a BHA wiper, 1.83 bpm, CT 5135 psi, diff 990 psi, Ct Wt -2k, WOB 0.8 k ROP 27 ft/hr Post, all 20 bbis lube pill out Ct Wt -6, WOB 0.5 k, had to pick up. - little effect, built and pumped a 20 bbl 2% low torque sweep from active mud. WOB up to 2.8 k lbs with neg CT wt, first time we've broke 1 k WOB all morning. lube up active system to 2% low torque. 23 N hr average 9/6/2017 9/6/2017 0.50 PROD3 DRILL DRLG P Drilling break, ROB up to 110 R/hr 15,118.0 15,150.0 10:12 10:42 PU's dropped to 43 k lbs, able to easily tum around Weight transfer gradually deteriorated at 140 bbls away of the 20 bbl pill ROP averaged 64 fUhr 9/612017 9/6/2017 0.40 PROD3 DRILL WPRT P Wiper #2 PU Wt 51 k - 1,450' 15,150.0 13,700.0 10:42 11:06 14,357' to 14,200'a little motor work 13,863' motor work, -1.4 k WOB, pulled —50 k , 10 k over clean string weight 9/6/2017 9/6/2017 0.50 PROD3 DRILL WPRT P Wiper RBIH 13,700.0 15,150.0 11:06 11:36 13,860' WOB spike 13,875' S/D 3.3 k, PU, RBIH min rate slid through Stack weight 13,906 to 13,968 while RIH Q min rate 9/6/2017 9/6/2017 5.40 PROD3 DRILL DRLG P BOBD, struggled to get to bottom, had 15,150.0 15,300.0 11:36 17:00 to reduce pumped rate and ramp up to drilling rate once on bottom. CT Wt -61k lbs, WOB 0.5 k ROP 20-70 fl/hr Straggling with weight transfer, build another 2% low torque pill, pump 20 bbis No change in weight transfer. Add beads to pill, pump with little benefit. Build 2 ppb beaded pills w active mud and pump as sweeps - 10 bbls each. little benefit. 9/6/2017 9/6/2017 4.00 PRODS DRILL DRLG P OBD, trouble fuming around below 15,300.0 15,376.0 17:00 21:00 15,110' Ct wt 0 to -8 k lbs, WOS, 0.3 to 1 k lbs, ROP 15 -40 ftJhr. Pumping 10 bbl beaded pills as needed with little effect Page 34151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Depth scan Tme End Time Dur (hr) Phase Op Cmin M ity Care Time P -T -X Operetim M) End Depth (flKe) 9/6/2017 9/712017 3.00 PROD3 DRILL DRLG P Continue drilling from 15,376', CWT = 15,376.0 15,407.0 21:00 00:00 -51K, WOB -.91K, rate in = 1.7 bpm, experiencing low ROP - 10-20 fph; samples from 15,386' showing signs _ of clay, rig geo sent logs and cenfered with town geology,decision made to increase inclination to 96° and - continue drilling ahead, looking for top of C4, gamma wrapping with bit depth of 15,436' 9/7/2017 9/7/2017 3.50 PRODS DRILL DRLG P Continue drilling ahead as per 15,407.0 15,440.0 00:00 03:30 geology, climbing to 96° inclination, CWT = -51K, WOB = 1.51K, rate = 1.7 bpm, observed short ROP breakouts up to 115 fph, gamma begins to wrap at 15,405' (gamma tool depth) 9!7/2017 9/7/2017 0.40 PRODS DRILL DRLG P Confute drilling ahead at 15,440', CWT 15,440.0 15,443.0 03:30 03:54 -4K, WOB = 1.81K, drilling through 150+ API formation, TD called at 15,433', PUW = 47K 9/7/2017 9/7/2017 4.00 PROD3 DRILL WPRT P Pump sweeps, circulate down coil, lay 15,443.0 83.0 03:54 07:54 -in beaded pill as per town request (50 bbl), perfrom swab WT. Saw a little motor work, - 1k WOB and - 4k overpull on CT @ 13,844 9/7/2017 9/7/2017 1.70 PRODS DRILL WPRT P RBIH to confirm formation pressure, 83.0 12,610.0 07:54 09:36 TD, and flags 9/7/2017 9/7/2017 0.30 PRODS DRILL DLOG P Tie in, drive by, PU 40 k lbs, RBIH, Tie 12,610.0 12,631.0 09:36 09:54 into K1 for+15' correction, Park at 12631.24 bit depth, Sensor depth 6114 TVD. Trap 3852 psi, watch it fall to 3715 psi ( baker annular pressure) calculated to 11.68 ppg and trending down. 977/2017 977/2017 0.50 PROD3 DRILL WPRT P RBIH to confirm formation pressure, 12,631.0 13,903.0 09:54 10:24 TD, and flags set down 9812017 917/2017 0.30 PROD3 DRILL WPRT P PU and RBIH pumping min weight, 13,903.0 13,507.0 10:24 10:42 Work pipe to 14,100', PUH, pulling heavy, work pipe, squating and pulling out of hole at 75 f1min, pulled up to 74k came free. pull up hole above the fault. CT weight 39 k lbs above the fault. 9/7/2017 977/2017 0.20 PRODS DRILL WPRT P RBIH, counter failed, did not notice for 13,507.0 13,661.0 10:42 10:54 3 minutes. 977/2017 977/2017 0.70 PRODS DRILL CLOG T Tum around, PU Wt 42 k PUH. 13,661.0 12,540.0 10:54 11:36 917/2017 9/7/2017 0.20 PRODS DRILL SVRG T Park and replace counter 12,540.0 12,540.0 11:36 11:48 9/7/2017 9/7/2017 0.20 PRODS DRILL DLOG T RBIH, tie into K1 + 13' 12,540.0 12,629.0 11:48 12:00 9/7/2017 9/7/2017 0.30 PROD3 DRILL WPRT T Continue to RIH, drop rate prior to 12,629.0 13,661.0 12:00 12:18 crossing billets and left it at 0.4 bpm. 9/7/2017 9/7/2017 0.60 PRODS DRILL WPRT P Continue to RIH, see 2 WOB bobble 13,661.0 15,406.0 12:18 12:54 at 13,837 and 14,00'. Increase pump rale to 1.2 below trouble area 13,400. Slack coil weight @ 14,779' reduce rate to 0.7 bpm, contiune on in hole. Set down in hot gamma area, stack 2.25K WOB - Page 35151 Report Printed: 9/27/2017 AM, Operations Summary (with Timelog Depths) 3M-27 qW Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log wart oepM Sten Time End Time Dur (hr) Phase Op Coda Activity Code Time P-T-X Operation (I1M) End Depth(ftKa) 9/7/2017 9/7/2017 3.60 FROM DRILL WPRT P PU, 49 k lbs 15,406.0 - 100.0 12:54 16:30 Pump beaded liner running pill start PUH after letting - 6 bbis out the bit Paint Yellow EDP flag @ 14178.2 in tension Chase liner running pill w KW Pull through fault area, neg WOB spikes from 13,875-13,833'. Paint White window flag @ 10976.12' continue to POOH. 9/7/2017 917/2017 1.50 FROM DRILL PULD P At surface flow check - good, PJSM, 100.0 0.0 16:30 18:00 LD BHA #30. 9/712017 9/7/2017 2.40 COMPZ3 CASING PUTB P PJSM, PU AL2 Liner Run #1, (non- 0.0 1,653.0 18:00 20:24 ported bullnose, 31' pup, 4 jnts slotted liner, 2 tracer pups, 36 jnts slotted, & shorty deployment sleeve) 9/7/2017 9/7/2017 0.60 COMPZ3 CASING PULD P PU BHA #31, AL2 Liner Running 1,653.0 1,697.0 20:24 21:00 Tools (CoilTmck), slide in cart, stab on coil, bump up, set counters 9/7/2017 9/8/2017 3.00 COMM CASING RUNL P RIH with AL2 Liner Run #1, PUW is 1,697.0 13,844.0 21:00 00:00 42K at window, tie into window flag for +15' correction Stack weight at 13,600'- 13,844', work pipe, PUW's = 45K-50K, up to negativel OK WOB. 9/8/2017 9/8/2017 3.00 COMPZ3 CASING RUNL P Continue RIH with AL2 Liner Run #1, 13,844.0 14,400.0 00:00 03:00 stack weight from 13,844' through14,115', PUW's 45K-48K, working liner at various speed, significant time working past 14,124'& 14,345' (top of crest past Fault #1), 9/8/2017 9/8/2017 1.50 COMPZ3 CASING RUNL P Continue working AL2 liner Run #1 14,400.0 15,410.0 03:00 04:30 towards bottom, slacking reduced sigficantly froml4,530', experience difficulty working liner past 15,073', park, circulate at .25 bpm, attempt again & get by, arrive at setting depth (bottom at 15,410), bring up rate to 1.7 bpm, release off liner. 9/8/2017 9/8/2017 3.00 COMPZ3 CASING TRIP P POOH, paint EDP flags 15,410.0 71.0 04:30 07:30 13,314' (yellow), & 13,270' (white), tie into K1 for+5' correction 9/8/2017 9/8/2017 0.50 COMPZ3 CASING PULD P At surface, PJSM, flow check - good, 71.0 0.0 07:30 08:00 LD liner running asembly over a dead well, inspected pipe --20' good. 9/8/2017 9/8/2017 1.50 COMPZ3 CASING PUTB P Prep floor for running liner, PU and 0.0 400.0 08:00 09:30 run 10 R3 joints 2-3/8" 4.6# L-80 slotted liner topped W two pups, 16.15' and an aluminum billet W - openhole anchors, ported bullnose'on bottom, .. upper AL2 liner length -428.58 9/8/2017 9/8/2017 0.70 COMPZ3 CASING PULD P PU / MU BHA #32 over a dead well, 400.0 - 489.8 09:30 10:12 1 1 tag up, set counters, open EDC, 9/6/2017 9/8/2017 2.90 COMPZ3 CASING RUNL P RIH, 400.0 12,589.8 10:12 13:06 Tie in to window flag for+ 15.4' correction. Page 36151 Report Printed: 9127/2017 Operations Summary (with Timelog uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Sled Time End Tme Der(hr) phew op Code Ac!J ty Code Tme P -T -X Operation (fiKB) End Depth(MKa) 9/8/2017 9/8/2017 1.00 COMPZ3 CASING RUNL P Down on pumps, Close EDC, PU Wt 12,589.8 13,759.0 13:06 14:06 42.5 k lbs continue to RIH Tie into K1 for+6.5' correction Trip to bottom at 35 ft/min with 14k Ct Wt, 0 WOB S/D @ 13,759', WOB 3.38 k PU W142 RBIH, S/D @ 13,759', 3.3K WOB, PU 35 k to slack weight, WOB 1.6 k, slip oriented 180 *ROHS. Online with the pumps, sheared - 4500 psi. PU Wt 40k, WOB 0 k lbs 9/8/2017 9/8/2017 2.30 COMPZ3 CASING TRIP P Park, reset counters, -POOH 13,759.0 70.0 14:06 16:24 9/8/2017 9/8/2017 1.00 COMPZ3 CASING PULD P At surface, flow check - Good, PJSM, 13,759.0 70.0 16:24 17:24 LD BHA #32. 9/8/2017 9/8/2017 0.80 PROD4 DRILL BOPE P Weekly BOP function test, good 0.0 0.0 17:24 18:12 9/8/2017 9/8/2017 1.10 PROD4 STK PULD P PJSM, PU BHA #33, AL2 -1 lateral 0.0 78.0 18:12 19:18 drilling assembly (0 hr agitator, 0.5° AKO X-Treme motor, RB Hughes bit), slide in cart, stab on coil, check pack - offs, good, check BHI counter, tag up, set counters, open EDC 9/8/2017 9/8/2017 2.40 PROD4 STK TRIP P Begin RIH with BHA #33, close EDC 78.0 12,605.0 19:18 21:42 - at 500', bring up rate, surface lest agitator, good 9/8/2017 9/8/2017 0.30 PROD4 STK DLOG P Tie into K1 to +18' correction, park, 12,605.0 12,649.0 21:42 22:00 open EDC 9/8/2017 9/8/2017 1.50 PROD4 STK DISP P Circulate hole to drilling fluid, observe 12,649.0 12,669.0 22:00 23:30 significant cuttings coming over shakers, observe small "plastic" looking material/shavings mixed with cuttings R beads, shut down pumps, Gose choke, close EDC 9/8/2017 9/8/2017 0.30 PROD4 STK TRIP P Continue RIH, tag TOB at 13,327', 12,669.0 13,327.0 23:30 23:48 PUW = 42K 9/8/2017 9/9/2017 0.20 PROD4 STK KOST P Bring rate up to 1.8 bpm, FS = 812 13,327.0 13,327.0 23:48 00:00 psi, begin kicking off billet at 150" ROHS, CWT = 14K, WOB =.7K, annular = 3900 psi, WHP = 0 psi, circ pressue = 4938 psi, 9/9/2017 9/9/2017 2.20 PROD4 STK KOST P Continue to KO billet at 13,227', FS = 13,327.0 13,337.0 00:00 02:12 860 psi, CWT = 14.3K, WOB =.55K. annular = 3907 psi, WHP = 0 psi, aluminum over shakers 9/9/2017 9/9/2017 1.80 PROD4 DRILL DRLG P Off billet w/o issue, drilling in 13,337.0 .13,500.0 02:12 04:00 formation, CWT = 1 OK, WOB = 1.5K, rate in = 1.8 bpm, annular = 3893 psi, dry drift billet up R down, clean WOB spike at 13,426' of 3852 psi, PU, FS down by -50 psi, bore pressure down by - 70 psi of bottom, continue drilling ahead watching parameters, similar event occured at 13,485' Page 37/51 Report Printed: 9/27/2017 ,. Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log 81ert Depm Start Time End Time Dw(hr) Phase Op Oode Activity Code Time P -T -X Opemexi (RKB) End Depth(eKB) 9/9/2017 9/9/2017 0.50 PROD4 DRILL DRLG P PUW = 50 K, BHA wiper, losses 13,500.0 13,538.0 04:00 04:30 began at 13,494', losing -.37 bpm, continue drilling, FS =850 psi, CWT = 9K, WOB = .43K, rate in = 1.76 bmp, rale out = 1.58 bpm, losses appear to be healing with continued drilling, experience difficulty, obtaining survey 9/9/2017 9/9/2017 0.50 PROD4 DRILL WPRT T Difficulty obtaining a clean survey, 13,538.0 13,538.0 04:30 05:00 PUH in attempt to get survey as per DD, no luck, RBIH to continue drilling in attempt to obtain clean survey. 9/9/2017 9/9/2017 1.00 PROD4 DRILL DRLG P BOBD, FS = 829 psi, obtained clean 13,538.0 13,600.0 05:00 06:00 survey at 13,513', CWT = 8K, WOB 2.6K, 9/9/2017 9/9/2017 0.20 PROD4 DRILL WPRT T PU, in attempt to re log missed 13,600.0 13,473.0 06:00 06:12 surveys 9/9/2017 9/912017 0.60 PROD4 DRILL WPRT T RBIH , attempt to pick up missed 13,473.0 13,600.0 06:12 06:48 surveys. caught enough to continue drilling with in parameters. 9/9/2017 9/9/2017 2.30 PROD4 DRILL DRLG P Attempted to vary pump rate to clean 13,600.0 13,771.0 06:48 09:06 - up surveys, no vibrations, not pump related. Appears to be interference from the AL2 liner that we just set. Ct RIHWt 10 k lbs, 1.76 bpm in/1.68 bpm out, CT 4747 psi, free spin 770 psi. OBD, WOB 1.5 to 2.5 k lbs, ROP 30- 220 ftrnr, ROPs increased - 13650 Send 5x5 sweep to time out for wiper Average over interval 74 Thr 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT T Wiper trip #1, PU 48 k lbs, PU after 13,771.0 13,350.0 09:06 09:24 5x5 exited the bit, PUH atempting to relog the misses surveys. No sucess. 9/9/2017 9/9/2017 - 0.40 PROD4 DRILL WPRT T RBIH 13,350.0 13,771.0 09:24 09:48 9/9/2017 9/9/2017 0.50 PROD4 DRILL DRLG P Ct RIHWt 10 k Ibs,1.75 bpm in /1.67 13,771.0 13,827.0 09:48 10:18 bpm out, Ct 4840 psi, diff 807 psi, OBD, CT Wt 7 k lbs, WOB 2 k lbs, ROP 100 ft/hr 9/9/2017 9/9/2017 5.20 PROD4 DRILL DRLG P Stack 3.46 k WOB @ 13,827'- no 13,827.0 14,020.0 10:18 15:30 motor work PU, 50 k attempt to restart, high weight on bit, low diff. PU and try again, 47 k PU Wt, same results PU 49 k, 100' BHA wiper, RBIH Got a bite, making hole, lost Ct Wt Ct Wt 2.5 k, WOB 2 k lbs, ROP initially 100 ft/hr then tapered off rapidly to 50 then 30 ft/hr, Inc fell from 93 to 89° while drilling ahead. Got the call @ 12:50 - 13,934' to turn straight up. Having a hard time building angle. Weight transfer diminishing. Page 38151 Report Printed: 9/27/2017 ,. Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Brad Cepm Btad Tune End Time Dw Ile) Phsee Op Code Activity Code Time P -T -X Operation (ftKB) rW Depth(8Ka) 9/9/2017 919/2017 0.30 PROD4 DRILL DRLG P PU and reduce rate to try and build 14,020.0 14,030.0 15:30 15:48 more angle. 1.53 bpm in/1.44 bpm out, CT 4288 psi, Diff 682 psi, Trying to target 2.5 k to 3 k WOB Ct wt -5 k lbs, WOB 1.99 k 9/9/2017 9/9/2017 1.00 PROD4 DRILL WPRT P Pump 5 x5 sweep PU Wt 42 k lbs, 14,030.0 12,752.0 15:48 16:48 PUH while sweeps travel to bit, pull to 13,855' Saw neg WOB spike 13,865' RBIH timing sweeps to exit near bottom, RIH Wt 10 k lbs PUH chasing sweeps on wiper trip through the build, saw motor work 12,880' 9/9/2017 9/9/2017 0.30 PROD4 DRILL WPRT P RBIH 12,752.0 14,030.0 16:48 17:06 9/9/2017 9/9/2017 1.40 PROD4 DRILL DRLG P Try reduced rate and increased WOB 14,030.0 14,065.0 17:06 18:30 to build angle, confered with town, decison made to POOH and PU - higher bend motor and new bit, pump sweeps 9/9/2017 9/912017 3.50 PROD4 DRILL TRIP T POOH, PUW = 45K, observe a bit of 14,065.0 78.0 18:30 22:00 motor work at —12,892' in build, park at 12,574', shut down pumps, close choke, open EDC, continue POOH, Gose EDC, surface lest agitator, good, tag up, space out (PJSM) 9192017 9/9/2017 1.80 PROD4 DRILL PULD T PUD BHA#33, checks not holding, 78.0 0.0 22:00 23:48 gather crew, quickly talk through PUD check list contingency for checks not holding, complete PUD, Hughes bit came out a 3-1 9/9/2017 9/10/2017 0.20 PROD4 DRILL PULD T Reconfigure BHA, PJSM, begin PD 0.0 0.0 23:48 00:00 BHA #34 (same agitator, 0.6+o AKO motor, RB HYC B8 Edge bit) 9/10/2017 9/10/2017 1.30 PROD4 DRILL PULD T Complete PD BHA #34 (agitator, 0.6`+ 0.0 78.0 00:00 01:18 AKO motor, RB HYC B8 Edge bit), slide in can, stab coil, check pack -offs, open EDC, tag up, set depth counters 9/10/2017 9/102017 2.40 PROD4 DRILL TRIP T Begin RIH with BHA#34, close EDC, 78.0 12,587.0 01:18 03:42 test agitator at 500', good, continue RIH Note: Crew performed "Spill Drill", excellent response time & communication 9/10/2017 9/10/2017 0.20 PROD4 DRILL DLOG - T Log Kt for +11' correction 12,587.0 12,638.0 03:42 03:54 9/10/2017 9/10/2017 0.50 PROD4 DRILL TRIP T Continue RIH 12,638.0 14,050.0 03:54 04:24 9/10/2017 9/10/2017 2.60 PROD4 DRILL DRLG P Tag bottom at 14,050'( higher than 14,065.0 14,210.0 04:24 07:00 expected (expected 14,065'), attempting to build, pumping 1.4 bpm, FS=665 psi, CWT =4K, WOB= 3.5K, annular = 3916 psi, unable to drill ahead, PU, bring up rale to 1.8 bpm, RSIH to 14,065 (expected bottom depth), FS = 1000 psi, CWT = 8.5K, WOB = 2K Page 39151 Report Printed: 912712017 Operations Summary (with Timelog Uepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth I Start. Time End T. Dur (hr) Phase Op Code Activity Code Time P-T-X Operation Me) End Deplh(IRKS) 9/10/2017 9/10/2017 1.60 PROD4 DRILL DLOG T PU Wt40 k lbs PU to catch missed 14,210.01 14,127.0 07:00 08:36 survey. No success. Slow tripping rate, slow pump rate, park. No - success. Pull up hole to re shoot old surveys, no success. Troubleshoot tools, research magnetic storm info, all indications are a tool failure. 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Decision made to trip for tool 14,127.0 6,036.0 08:36 10:18 PUH into casing, Open EDC, Pump 2.20 bpm and POOH 9/10/2017 9/10/2017 1.70 PROD4 DRILL TRIP T Pipe pin holed as it came across the 6,036.0 88.0 10:18 12:00 goose neck. - 6030' pin hole -15' off end of goose neck. Parked, down on pumps, bled pressure, upper checks holding. Eased coil onto the storage reel and marked hole with paint. Continued out of hole. 9/10/2017 9/10/2017 1.50 PROD4 DRILL PULD T Bump up, PUD +LD BHA #34 88.0 0.0 12:00 13:30 9/10/2017 9/10/2017 0.50 PROD4 DRILL CTOP T Clean floor, install nozzle and stab on. 0.0 0.0 13:30 14:00 9/10/2017 9/10/2017 3.00 PROD4 DRILL DISP T Line up coil to displace Power Pro w 0.0 0.0 14:00 17:00 - water, -0.5 bpm, 1100 psi, returns to the pit. HES N2 PJSM and dg up. 9/10/2017 9/10/2017 1.50 PROD4 DRILL DISP T Water back to the pits, divert retums 0.0 0.0 17:00 18:30 to the TT, Halliburton cooling down PT to 3,500 psi., blow down surface lines & reel with N2, bleed down WHP &, coil pressure, HES rig down 9/10/2017 9/10/2017 2.70 PROD4 DRILL CTOP T Pumping managed pressure (1000 0.0 0.0 18:30 21:12 psi), align inner reel iron, slide back cart, lock out & chain reel, lock out injector, remove bulkhead & inner reel iron, cut a-line, remove depth counters Peak moved reel #5772 to 1 ES by 20:00 him to begin MU plates & spacers. Notification given to AOGCC for early BOPE test (10:00am 9111), witness waived by Jeff Jones. 9/10/2017 9/11/2017 2.80 PROD4 DRILL CTOP T PJSM, install grapple, pull test, 0.0 0.0 21:12 00:00 unstab, wind up, & secure coil in prep for reel swap, cut coil 9/11/2017 9/11/2017 3.00 PROD4 DRILL CTOP T PJSM, stack cable, unlock reel, rig up 0.0 0.0 00:00 03:00 shackles/slings, remove saddle clamps, 9/1112017 9/11/2017 2.30 PROD4 DRILL CTOP T PJSM, Lift reel from saddles, drop 0.0 0.0 03:00 05:18 hubs & spacers, SIMIPS remove stripper, inspect brass Note: Losing -1 bbl/hr pumping MP 9/11/2017 9/11/2017 6.70 PROD4 DRILL CTOP T Remove & replace A-frame, Cut 0.0 0.0 05:18 12:00 remaining coil in pipe shed, clean stripper and replace brass. Page 40151 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time EmInme Dw(hr) Phase op Cmis Adivk Code Time P -T -X Operation (WEI) End Depth MKB) 9/11/2017 9/11/2017 6.00 PROD4 DRILL CTOP T Flush lines, remove and replace R1 0.0 0.0 12:00 18:00 and R3, Re install stripper brass, PJSM, Load storage reel onto Peak bed truck. Crew change 9/11/2017 9/11/2017 4.00 PROD4 DRILL CTOP T pick up stripper and QTS, skid cart, 0.0 0.0 18:00 22:00 install night cap, grease stack and valves, central shops valve crew greased tree valves, Flood up. 9/11/2017 9/12/2017 2.00 PROD4 WHDBOP BOPE P BOP Start time 10:00 - Wintess 0.0 0.0 22:00 00:00 waived by Jeff Jones AOGCC Test #1, swab - good Test #2, Lower blind, TV2 - good Test #3, TV1, - good Test #4, Upper blind, B1&5, C 4,5,8,&12, Rt, Bleederl - good Test #5, C 3,6,7,&11 B2&6 and T2 - ran out 5 min -good Test #6, Manual ChokeD and Super Choke C, -good Test #7, C2, 10 and T 1 - good Test #8, R1, Bleeder 2, Charlie 1 &9 - good 9/12/2017 9/12/2017 3.00 PROD4 WHDBOP BOPE P Continue BOPE test 0.0 0.0 00:00 03:00 Test #9, Bravo 4 &8, Romeio 3, &. Bleeder 3 - good Test #10, Bravo 3 & 7 - good Test #11, annular BOP, - good Test #12, Upper 2-3/8" pipe slip rams, upper TI W valve - good Test #13, Lower 2-3/8" pipe slip rams - good Test #14, Lower 2" pipe slip rams - fail/pass Test #15, Upper 2" pipe slip rams, lower TIW valve - good Accumulator draw down test, good No inner reel iron test, waiting on reel Test complete in 5 his. 9/12/2017 9/12/2017 3.00 PROD4 DRILL CTOP T Blow down chokes, clean down lower 0.0 0.0 03:00 06:00 mast, inspect chokes, grease R1, 2, & 3, lay down test joint, install spacer on hub, prepping CTS counter for reel install 9/122017 9/12/2017 4.00 PROD4 DRILL CTOP T Continue prepping to ensure rig is 0.0 0.0 06:00 10:00 ready for reel install, change out rubber on inner reel iron, various rig cleaning projects... 9112/2017 9/12/2017 8.00 PROD4 DRILL CTOP T Installed rebuild INJH counter 0.0 0.0 10:00 18:00 assembly, prep/dress grapple connector for new coil, install spacer plate on reel motor hub, clean INJH blocks, stock pits with sack products, two hands went to Deadhorse to help with reel mods, Build Bulk Head, test gas alarms, inspect lighting around rig, inspect elevators, work on work - orders, and mop around ng. Make trip to Deadhorse to inspect work on spool. Page 41151 Report Printed: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stars Tvae End Tana Disair) Phase Op code Acbviy Cade Time P -T -X Operation (0KB) End Depth(NKB) 9/12/2017 9/12/2017 1.50 PROD4 DRILL SFTY T Hold Nabors global safety week kick 0.0 0.0 1800 19:30 off meeting / CTD performance YTD with Patrick Doherty and Kazeem Adegbola 9/12/2017 9/13/2017 4.50 PROD4 DRILL CTOP T Prep reel area for new spool, Service 0.0 0.0 19:30 00:00 level wind, Clean gripper blocks, Change oil in right angle drives. Work orders 9/13/2017 9/13/2017 6.00 PROD4 DRILL CTOP T Continue prepping for next reel install 0.0 0.0 00:00 06:00 9/13/2017 9/13/2017 10.00 PROD4 DRILL CTOP T Torqued up all pillow block bolts, put 0.0 0.0 06:00 16:00 together all tools and parts for intalling hubs, inspected SRL's and replaced tie back lines, inspected all re -heading equipment, hooked back up drawwork camera, sent 2 rig hands to Deadhorse to assist on spool mods, shipped all tubing cribbage back to warehouse. 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T Replace INJH motor #2 with new style 0.0 0.0 16:00 18:00 coupler 9/13/2017 9/1312017 1.50 PROD4 DRILL CTOP T Crew change, continue replacing 0.0 0.0 18:00 19:30 coupler on motor # 2 9/13/2017 9/13/2017 2.00 PROD4 DRILL CTOP T New CT string on location. Swap out 0.0 0.0 19:30 21:30 nuts on hub adapters and double check torque. 9/13/2017 9/14/2017 2.50 PROD4 DRILL CTOP T Coupler upgrade complete. Spot in, 0.0 0.0 21:30 00:00 reel on flatbed and rig up to pick. Pick _ up string and install. Torque up saddle clamps, Rig up stabbing grapple to CT and pull test 9/14/2017 9/14/2017 2.50 PROD4 DRILL CTOP T Pull CT into injector, Rig down 0.0 0.0 00:00 02:30 stabbing cable. Trim 7' of coil to find wire. Test wire, 550 MOhmes, 50.1 Ohmes Good test 9/14/2017 9/14/2017 3.50 PROD4 DRILL CTOP T PJSM to install inner reel iron and CT 0.0 0.0 0230 06:00 connector - Prep CT for CT connector and install. 9/14/2017 9/14/2017 8.50 PROD4 DRILL CTOP T Crew change, install bulkhead (5/16 th 0.0 0.0 06:00 14:30 cable) and junction box, line up wash pipe inside reel, with new clamp, check inner reel iron and secure, head -up BHI upper quick, change pac-offs, stab INJH, fluid pack reel 9/14/2017 9/14/2017 0.80 PROD4 WHDBOP BOPE T Test and chart inner reel and stripper 0.0 0.0 14:30 15:18 test 9/14/2017 9/14/2017 1.00 PROD4 DRILL CTOP T Displace reel to drilling fluid, PT CTC 0.0 0.0 15:18 16:18 4,000 psi 9/1412017 9/14/2017 1.50 PROD4 DRILL PULD T PJSM, MU/PD drilling BHA# 35m M/U 0.0 78.2 16:18 17:48 to coil and surface test, Start BHI NPT @16:55 9/14/2017 9/14/2017 3.30 PROD4 DRILL TRIP T Trip in well, No CTK depth, plug in 78.2 12,171.0 17:48 21:06 encoder, @ 11895' CTES EOP counters are off - 100'. Injector _ counters off depth, Clean counters on way in hole. New CT string appears to have an anti corrosion coating allowing counters to slip Page 42151 Report Printed: 9/2712017 Operations Summary (with Timelog Depths) 3M-27 s Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK TiYtie Log sbn Oepm start Tie Ertl Tune Our (hr) Phase Op Code Activity CDde Time P -T-% Opembon (Po(B) End Depth (ftKB) 9/14/2017 9/14/2017 0.70 PROD4 DRILL DLOG T Log RA for+424'Again clean 12,171.0 12,330.0 21:06 21:48 - counters, CT still has some coating on it 9/14/2017 9/14/2017 1.50 PROD4 DRILL TRIP T Continue in hole, Perform check 12,330.0 14,179.0 21:48 23:18 surveys, slow doom to get gamma info to compare with earlier logs 13874 to 13890'- Depths off 9/14/2017 9/1512017 0.70 PROD4 DRILL WPRT P 14179 appears to be bottom, Come up 14,179.0 13,752.0 23:18 00:00 to 1.5 BPM, wiper up hole circulating drilling Fluid, cleaning up CT string, PUW=40K, Start dragging heavy @ 14009, RBIH, PUH pulling 50-55K 1400910 13752 END BHI NPT @. 23:19 for 6.4 Hrs *" TT NPT BHI MWD DGS 11.0 hrs 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT P Continue up hole to tie into gamma 13,752.0 13,630.0 00:00 00:12 signature @ 13850' 9/15/2017 9/15/2017 0.30 PROD4 DRILL WPRT P RBIH, Setdown @ 13842, Attemp to 13,630.0 13,840.0 00:12 00:30 tie in sticky hole conditions preventing maintaining logging speed 9/15/2017 9/15/2017 0.40 PROD4 DRILL, WPRT P Wiper up hole to log RA, PUW=40K 13,840.0 12,650.0 00:30 00:54 9/15/2017 9/15/2017 0.40 PROD4 DRILL DLOG P Log RA for +30.5' correction 12,650.0 12,727.0 00:54 01:18 9/15/2017 9/15/2017 1.30 PROD4 DRILL WPRT P Wipe back in hole, redo check shot 12,727.0 14,210.0 01:18 02:36 surveys 9/15/2017 9/15/2017 4.00 PROD4 DRILL DRLG P 14,210', Tag bottom where it is 14,210.0 14,341.0 02:36 06:36 supposed to be. 13,850 to 14,000' area has cleared up. Drill ahead 1.8 BPM @ 5286 PSI FS, BHP=4260, RIW=-2K, DHWOB=1K, WHP=O, ECD=12.8, ROP 40 to 65 FPH New Mud at the bit 14,336' *`* Old Mud stats; 1,546' DF, 0.75% DS 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,341.0 14,341.0 06:36 - 07:06 perfrom check shots, unable to get clean survey's, confer with town, phone in survey IFR to Sperry Drilling/Haliburton survey management analyst 9/15/2017 9/15/2017 1.50 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,750 psi, BHP 14,341.0 14,354.0 07:06 08:36 3,970, WHIP 20, IA 0, OA 417, CTSW=2 k, DHWOB=1.5 k, ROP 10 fph 9/15/2017 9/15/2017 0.25 PROD4 DRILL WPRT T PUH, perform check shots, getting 14,354.0 14,354.0 08:36 08:51 clean survey's, RBIH 9/15/2017 9/15/2017 3.25 PROD4 DRILL DRLG P BOBO, 1.8 bpm at 4,715 psi, BHP 14,354.0 14,490.0 08:51 12:06 3,973, WHP 20, IA 0, OA 417, CTSW=O k, DHWOB=1.0 k, ROP 51 fph 9/15/2017 9/15/2017 0.20 PROD4 DRILL WPRT T PUH, dirty surveys (Solar Activity), 14,490.0 14,490.0 12:06 12:18 perfrom check shots, able to get clean surveys Note: Kick wihile drilling drill Page 43151 ReportPrinted: 912 712 01 7 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Time Erq Tna Dw(hr) Phase Op Code Ar Ry Cone Time P -T -x operaw (MB) End Depth (WS) 9/15/2017 - 9/15/2017 2.85 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,715 psi, BHP 14,490.0 14,595.0 12:18 15:09 4,010, WHP 24, IA 0, OA 454, CTSW=1.7 k, DHWOB=1.5 k, ROP 60 fph 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 13,850', PUW 34 k 14,595.0 13,850.6- 15:09 15:39 9/1512017 9/15/2017 0.20 PROD4 DRILL DLOG P Log up to check depth from 13,915 - 13,850.0 13,915.0 15:39 15:51 1 13,872', depth ok 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 2 k. 13,915.0 14,595.0 15:51 16:21 9/15/2017 9/1512017 0.25 PROD4 DRILL DRLG P BOBD, 1.8 bpm at 4,610 psi, BHP 14,595.0 14,695.0 16:21 16:36 4,145, WHP 24, IA 0, OA 456, CTSW=minus 2 k, DHWOB=minus 5.9 k, ROP 30 fph 9/15/2017 9/15/2017 0.50 PROD4 DRILL WPRT T Counter locked up, wiper up hole to 14,595.0 12,720.0 16:36 17:06 log RA marker for depth control, PUW=35K 9/15/2017 9/15/2017 0.20 PROD4 DRILL DLOG T Log Tie in for+9.5' correction 12,720.0 12,571.0 17:06 17:16 9/152017 9/1512017 0.80 PROD4 DRILL WPRT 'T Wiper back in hole to drill 12,571.0 14,603.0 17:18 18:06 9/15/2017 9/1512017 1.90 PROD4 DRILL DRLG P 14603', Drill, 1.77 BPM @ 4835 PSI 14,603.0 14,640.0 18:06 20:00 FS, BHP=4090, RIW=1.7K, DHWOB=.8K 9/15/2017 9/1512017 0.20 PROD4 DRILL WPRT P Pull BHA wiper, PUW=37K 14,640.0 14,640.0 20:00 20:12 9/15/2017 9/16/2017 3.80 PROD4 DRILL DRLG P 14640', Drill, 1.79 BPM @ 4735 PSI 14,640.0 14,759.0 20:12 00:00 FS, BHP=4735 9/16/2017 9/16/2017 4.40 PROD4 DRILL DRLG P 14,759', Drill ahead, 1.78 BPM @ 14,759.0 14,858.0 00:00 04:24 4735 PSI FS, BHP=3950, RIW=-4.8K, DHWOB=I.2K 9/1612017 9116/2017 0.20 PROD4 DRILL WPRT P Pull BHA Wiper, PUW=34K, Stacking, 14,858.0 14,858.0 04:24 04:36 low surface weight, Low ROP, tough getting back to bottom, pull 1 00'trip 9/16/2017 9116/2017 1.50 PROD4 DRILL DRLG P 14858, Drill, 1.79 BPM @ 4752 PSI 14,858.0 14,907.0 04:36 06:06 FS, BHP=3955, RIW=2.55K off bottom . 9/16/2017 9/162017 2.00 PROD4 DRILL DRLG P Lower pump rate to gain ROP. PUW 14,907.0 14,959.0 06:06 08:06 35 k, 1.5 bpm at 4,070 psi FS, IA 0, OA 523BHP 3,940, WHP 0, CTSW - minus 2.0 k, DHWOB=0.3 k, ROP 29 fph 9/16/2017 9/16/2017 2.50 PROD4 DRILL DRLG P PUH, by-pass screens, pump 20 14,959.0 15,000.0 08:06 10:36 beads x 20 active x 20 beads, BOBD, 1.81 bpm at 5,170 psi, BHP 4,045, WHP 0, IA 0, OA 524, CTSW=minus 2.0 k, DHWOB 0.4 k, IA 0, OA 523 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper up hole to 14,000', PUW 34 k 15,000.0 14,000.0 10:36 11:06 9/16/2017 9/16/2017 0.50 PROD4 DRILL WPRT P Wiper back in hole, RIW 1.0 k, 14,000.0 15,00o.0 11:06 11:36 9/16/2017 9/16/2017 0.20 PROD4 DRILL DRLG P BOBD, 1..79 bpm at 5,025 psi FS, 15,000.0 15,007.0 11:36 11:48 BHP 4,055, WHIP 0, CTSW=minus 2.0 k, DHWOB=0.6 k, IA 0, OA 522 9/16/2017 9/16/2017 1.00 PROD4 DRILL WPRT P Packing off, annular pressure 15,007.0 12,720.0 11:48 12:48 increased 200 psi, wiper up hole for a tie in, pump 5x5 sweep, clean EOB Page 44151 Report Printed: 9/27/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Tune Emi Time Dur (hr) Phase op cm1e A,xlrity Cotle Time P -T -X Operation (RKa) End Depth ME) 9/16/2017 9/16/2017 0.20 PROD4 DRILL DLOG P Log RA correction of plus 10.5' 12,720.0 12,754.0 12:48 13:00 9/16/2017 9/16/2017 0.70 PROD4 DRILL WPRT P Wiper back in hole, RIW minus 2.0 k 12,754.0 15,015.0 13:00 13:42 9/16/2017 9/16/2017 1.60 PROD4 DRILL DRLG P BOBO, 1.82 bpm at 5,250 psi, BHP 15,015.0 15,037.0 13:42 15:18 4,105, WHP 0, IA 0, OA 522, CTSW=1.0 k, DHWOB=0.6 k, ROP 21 fph 9/16/2017 9/16/2017 0.20 PROD4 DRILL WPRT P P/U for weight transfer / slight packing 15,037.0 15,037.0 15:18 15:30 off, PUW=45K 9/16/2017 9/16/2017 2.80 PROD4 DRILL DRLG P 15037', Drill, 1.42 BPM @ 404OPSI 15,037.0 15,119.0 15:30 18:18 FS, BHP=4065, RIW=-7K @ 1.4K DHWOB 9/16/2017 9/16/2017 1.30 PROD4 DRILL WPRT P Pull 100' wiper, PUW=39K, Cannot 15,119.0 15,119.0 18:18 19:36 get back to bottom. Pull 1000' wiper 9/16/2017 9/16/2017 2.40 PROD4 DRILL DRLG P 15117', Drill, 1.77 BPM @ 5022 PSI 15,119.0 15,153.0 19:36 22:00 FS, BHP=4051, RIW=-2K @ 1.2K DHWOB, Pump 10 BBI beaded pill @ 19:45 9/16/2017 9/16/2017 0.30 PROD4 DRILL WPRT P Pull 100'wiper, PUW=35K 15,153.0 15,153.0 22:00 22:18 9/16/2017 9/17/2017 1.70 PROD4 DRILL DRLG P 15153', Drill, 1.69 BPM @ 4700 PSI 15,153.0 15,186.0 22:18 00:00 FS, BHP=4032, RIW=-2K @ 1K DHWOB 9/17/2017 9/17/2017 0.30 PROD4 DRILL DRLG P Continue drilling ahead, 1.69 BPM @ 15,186.0 15,188.0 00:00 00:18 4700 PSI FS, BHP=4037 9/17/2017 9/17/2017 0.20 PROD4 DRILL WPRT P Low weight, Pull 100' BHA wiper, 15,188.0 15,188.0 00:18 00:30 PUW=34K 9/17/2017 9/17/2017 0.90 PROD4 DRILL DRLG P 15188 Drill, 1.67 BPM @ 4772 PSI 15,188.0 15,200.0 00:30 01:24 FS, BHP=4066, RIW -4.5K @ 1.4K DHWOB 9/17/2017 9/17/2017 0.30 PROD4 DRILL WPRT P Low weight, Pull 100'13HAwiper, 15,200.0 15,200.0 01:24 01:42 PUW=35K 9/17/2017 9/17/2017 1.50 PROD4 DRILL DRLG P 15200', Drill. 1.67 BPM @ 4787 PSI 15,200.0 15,211.0 01:42 03:12 FS, BHP=4066 Pumped 10 BBI beaded pill @ 2:31 9/17/2017 9/17/2017 1.00 PROD4 DRILL WPRT P 1 00'Wiper, PUW=34K, Got back to 15,211.0 15,211.0 03:12 04:12 bottom and could not get drilling, Pull 400' wiper, PUW=32K, Pumped 10 BBI Beaded pill 3:05 and 4:00 9/17/2017 9/17/2017 2.20 PROD4 DRILL DRLG P 15211', Drill, 1.69 BPM @ 7987 PSI 15,211.0 15,224.0 04:12 06:24 FS, BHP=4097 9/17/2017 9/17/2017 0.30 PROD4 DRILL WPRT P 200', wiper up hole, PUW 31k, pump 15,224.0 15,224.0 06:24 06:42 5x5 low/high 9/1.7/2017 9/17/2017 8.00 PROD4 DRILL DRLG P 15,224, BOBO 1.40 bpm at 3950 psi 15,224.0 15,305.0 06:42 14:42 FS, BHP 4000, WHP 0, IA 0, OA 535, CTSW=minus 7.0 It, DHWOB=2 k, ROP=1.7 k, low ROP, weight transfer issues. 9/17/2017 9/17/2017 0.50 PROD4 DRILL WPRT P Pump 10x10 sweep, clean hole 15,305.0 15,305.0 14:42 15:12 9/17/2017 9/17/2017 4.50 PROD4 DRILL TRIP P POOH, laying in 45 bbls beaded pill, 15,305.0 71.6 15:12 19:42 perform 300' jog from 550 feet. No additional cuttings over the shaker 9/172017 9/17/2017 1.70 PROD4 DRILL PULD P At surface, PJSM, PUD BHA #35 71.6 0.0 19:42 2124 Page 45151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Tkm Dur(hr) Phase Op code Ac" Code Time P-T-X Operation (WB) End Depth MR) 9/17/2017 9/17/2017 2.40 PROD4 DRILL PULD P PJSM, M/U lower section of tool, FVS, 0.0 78.2 21:24 23:48 agitator, 2 318".5' motor, RR HYC bit. PD BHA #36. Check pack offs, Change out checks in UQC. M/U to coil and surface test. Strip on well 9/17/2017 9/18/2017 0.20 PROD4 DRILL TRIP P Trip in well, shallow test agitator, 78.2 400.0 23:48 00:00 continue in well 9118/2017 9/18/2017 2.20 PROD4 DRILL TRIP P Continue in well after shallow agitator 400.0 12,595.0 00:00 02:12 test 9/18/2017 9/182017 0.20 PROD4 DRILL DLOG P Log K1 for +7.6, PUW=29K 12,595.0 12,622.0 02:12 02:24 9/18/2017 9/182017 2.00 PROD4 DRILL TRIP P Continue in well, clean pass through 12,622.0 15,315.0 02:24 04:24 window, clear through 13850 to 14,000'. Last 30'tight hole conditions with low surface weight, DHWOB with no differential pressure. Annular pressure fluctuating. Multiple pick ups to work to bottom 9/18/2017 9/182017 5.50 PROD4 DRILL DRLG P 15315', Drill, 1.62 BPM @ 4863 PSI 15,315.0 15,382.0 04:24 09:54 FS, BHP=4228, DHWOB=1.4K RIW=- 4.6K BHA Wipers 15328',15340', 15357',15372,15382'. PUW 35-38 k 9/182017 9/18/2017 0.50 PROD4 DRILL CIRC P Pump 1 0x1 0 sweep, followed by 15,382.0 15,366.0 09:54 10:24 beaded drilling fluid pill 9/182017 9/18/2017 2.85 PROD4 DRILL WPRT P POOH, laying in drilling fliud beaded 15,366.0 1,533.0 10:24 13:15 pill, little motor work as well as over pulls lhru 13850' area, continue POOH Perform 300' jog at 1,500' 9/18/2017 9/18/2017 0.15 PROD4 DRILL SVRG P Adjust goose neck 1,533.0 1,533.0 13:15 13:24 9118/2017 9/18/2017 0.40 PROD4 DRILL WPRT P Continue wiper to surface, testing 1,533.0 78.2 13:24 13:48 agitator (good test) 9/18/2017 9/18/2017 0.15 PROD4 DRILL TRIP P At surface, re-set counters 78.2 78.2 13:48 13:57 9/1812017 9/18/2017 2.00 PROD4 DRILL TRIP P RBIH, to confirm TD 78.2 12,600.0 13:57 15:57 9/18/2017 9/18/2017 0.25 PROD4 DRILL DLOG P Log the K1 marker correction of plus 12,600.0 12,644.0 15:57 16:12 1 4.5' 9/1812017 9/18/2017 0.25 PROD4 DRILL TRIP P PUW 28 k, continue IH, perform static 12,644.0 12,710.0 16:12 16:27 pressure check at 12710' bit depth, sensor depth 6,172 TVD, 3,723 psi AP, 11.7 ppg, and dropping. Continue IH lhru window 9/18/2017 9/18/2017 1.25 PROD4 DRILL TRIP P Continue IH, RIH 8 k 12,710.0 15,380.0 16:27 17:42 9/18/2017 9/16/2017 0.50 PROEM DRILL CIRC P Confirmed TD 15,380', circulate 12.0 15,380.0 15,380.0 17:42 18:12 ppg beaded liner pill into coil. 9/18/2017 9/18/2017 3.50 PROD4 DRILL TRIP P POOH, laying in 12.0 ppg liner running 15,380.0 78.2 18:12 21:42 pill with beads up to 12070', painting EOP flags at 10,900' (white) & 13,600' (yellow) 9/18/2017 9/182017 0.50 PROD4 DRILL OWFF P Al surface, check well for flow, PJSM 78.2 78.2 21:42 22:12 for LD drilling BHA on a dead well 9/18/2017 9/18/2017 1.00 PROD4 DRILL PULD P LD Drilling BHA# 36 78.2 0.0 22:12 23:12 Page 46161 Report Printed: 9/2712017 Operations Summary (with Timelog Depths) 3M-27 is Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Tare End Time 1Ta (hr) Phase Op Cale AC[Mty CMB Time PJA Operation (Fd(B) EM Depth MKB) 9/18/2017 9/18/2017 0.50 PROD4 DRILL PULD P Function test BOP stack 0.0 0.0 23:12 23:42 9/1812017 9/19/2017 0.30 COMPZ4 CASING PULD P Prep rig floor for PU liner assembly 0.0 0.0 23:42 00:00 9/19/2017 9/19/2017 0.30 COMPZ4 CASING CTOP P Continue preeping floor to run liner, 0.0 0.0 00:00 00:18 PJSm to run liner 9/19/2017 9/19/2017 2.10 COMPZ4 CASING PUTB P M/U lower AL2 -01 liner segment with 0.0 1,673.8 00:18 02:24 non ported bullnose, 2 pups, 2 tracers # T912 Blue and T740 Freen. 39 Jts slotted liner and shorty deployment sleeve. 9/19/2017 9/19/2017 1.70 COMPZ4 CASING PULD P PJSM, PIU coil trek with GS Spear, 1,673.8 1,718.0 02:24 04:06 M/U to liner. Set in slips, Skid injector. Swap out checks in UQC. Check pack offs, Make up to coil and surface test 9/19/2017 9/19/2017 1.40 COMPZ4 CASING TRIP P RIH BHA# 37, AL2 -01 lower liner-. 1,718.0 12,619.0 04:06 05:30 segment 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Correct to 10,600' EOP flag for+4' 12,614.0 12,618.0 05:30 05:36 correction, PUW=32K, DHWOB=BK 9/19/2017 9/19/2017 5.70 COMPZ4 CASING TRIP P Continue in well, Clean trip through 12,618.0 15,380.0 05:36 11:18 window and past billets. Initial setdown @ 13475. Work pipe to gel -5-15 feet per cycle. Clean pick ups @ 34-40K. Got clear @ 14,700' to TD @ 15380 9/19/2017 9/19/2017 0.30 COMPZ4 CASING TRIP P Liner on bottom, PUW=55K, Bring 15,380.0 13,706.2 11:18 11:36 pumps online @ 1.5BPM, PUW=30K. Liner released. PUH and remove liner length left in hole from counters, 1673.82' 9/19/2017 9/19/2017 0.40 COMPZ4 CASING TRIP P Trip out of hole, Paint 12,700' EOP 13,706.2 12,580.0 11:36 12:00 flag - Uncorrected 9/19/2017 9/19/2017 0.10 COMPZ4 CASING DLOG P Log K1 for+4' correction 12,580.0 12,614.0 12:00 12:06 9/19/2017 9/1912017 2.10 COMPZ4 CASING TRIP P Continue trip out of well, Paint EOP 12,614.0 68.5 12:06 14:12 flag @ 11,700' 9/19/2017 9/19/2017 0.60 COMPZ4 CASING PULD P At surface, Flow check, PJSM. Lay 68.5 0.0 14:12 14:48 down liner running tools 9/19/2017 9/19/2017 0.50 COMPZ4 CASING PULD P R/U floor to run liner, PJSM Run AL2- 0.0 0.0 14:48 15:18 1 1 01 upper liner segment 9/19/2017 9/19/2017 2.10 COMPZ4 CASING PUTS P M/U 12-01 upper liner segmet with 0.0 849.5 15:18 17:24 ported bull nose, 21 Jts slotted liner, and shorty deployment sleeve, Perform BOP kick while running liner drill, slide in cart, check packoffs, 9/19/2017 9/19/2017 2.70 COMPZ4 CASING RUNL P RIH with 1-2-01 Run #2, tie into 849.5 0.0 17:24 20:06 window flag for a +8.9 correction, tie into K1 for 0' correction, continue RIH to set depth (tagged at 13,707'), PUW = 38K, RBIH, bring up pumps to 1.4 bpm, PUW = 30K, sheared off liner 9/19/2017 9/19/2017 2.50 COMPZ4 CASING TRIP P Trip to surface, flow check well, PJSM 13,707.0 45.0 20:06 22:36 9/1912017 9/19/2017 0.90 COMPZ4 CASING PULD P LD BHA #38, observe flat spot - 3' up 45.0 0.0 22:36 23:30 from EDP, within spec (.124" measured for .175" pipe) 9/19/2017 9/20/2017 0.50 COMPZ4 CASING PULD P PU BHA#39 (ported bull -nose, 3 pup 0.0 50.0 23:30 00:00 jnts, OH anchor & aluminum billet) Page 47151 Report Printed: 9127/2017 Operations Summary (with Timelog Depths) 3M-27 ... Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time our (hr) Phase Op code Activity Code Time P-T-X Operation W13) End Depth (MR) 9/20/2017 9/20/2017 0.50 COMPZ4 CASING PULD P Continue PU BHA #39 (ported bull- 50.0 100.0 00:00 00:30 nose, 3 pup jnts, OH anchor & aluminum billet), slide in cart, stab on, open EDC, tag up, set counters 9/20/2017 9/20/2017 3.60 COMPZ4 CASING RUNL P RIH with BHA #39, tie in for+3' 100.0 12,857.0 00:30 04:06 correction, weight check = 32K, close EDC, continue RIH to set depth, PUW = 33K, RBIH to set depth (12,856.6'), orient anchor 10° ROHS, bring up pumps, release off anchor, set down weight 4.51K WOB, good set 9/20/2017 9/2012017 2.10 COMPZ4 CASING TRIP P POOH 12,857.0 73.0 04:06 06:12 Note: Spill Drill (Pits) 9/20/2017 9/20/2017 1.20 COMPZ4 CASING PULD P PJSM, Flow check well, lay down BHA 73.0 - 0.0 06:12 07:24 # 39, Anchor billet running tools 9/20/2017 9/20/2017 0.70 PROD5 STK PULD P PJSM, M1U BHA #40 to kick off liner 0.0 72.2 07:24 08:06 top billet with 1.7° motor RR HYC bi center, M/U to tail and surface test. Change packoffs, swap out UQC checks 9/20/2017 9/20/2017 2.30 PRODS STK TRIP P RIH BHA #40 72.2 12,595.0 08:06 10:24 9/20/2017 9/20/2017 0.10 FROM STK DLOG P Log K1 for+7' correction 12,595.0 12,629.0 10:24 10:30 9/20/2017 9/2012017 0.10 PROD5 STK TRIP P RIH 12,629.0 12,700.0 10:30 10:36 9/20/2017 9/20/2017 1.70 PROD5 STK TRIP P Park and displace well back to 8.8 12,700.0 12,700.0 10:36 12:18 PPG PwrPro 9/20/2017 9/20/2017 0.10 PROD5 STK TRIP P Close EDC, PUW=33K, Trip in, clean 12,700.0 12,745.0 12:18 12:24 pass through window 9/20/2017 920/2017 0.10 PROD5 STK DLOG P Log RA for-2.5' correction 12,745.0 12,749.0 12:24 12:30 9/20/2017 9/20/2017 0.20 PROM STK TRIP P Continue in hole, Dry tag billet @ 12,749.0 12,818.0 12:30 12:42 12818, PUH 920/2017 9/20/2017 0.90 PRODS STK KOST P Bring pups on line, 1.69 BPM @ 4320 12,818.0 12,818.5 12:42 13:36 PSI FS, BHP=3945, RIW=13.l K, start milling @ 12817, made 12818.5 then had multiple stalls, reduce pump rate to 1.4BPM and work through 9/202017 9/20/2017 5.00 PROD5 STK KOST P Go to 2 FPH, continue to stall, working 12,818.5 12,819.0 13:36 18:36 multiple TF's, decision made to POOH & PU agitator 9/20/2017 9/20/2017 2.40 PROD5 STK TRIP P POOH for agitator, park above 12,819.0 72.0 18:36 21:00 window, open EDC, swap from choke A to choke B, choke fully open though still holding -1000 psi pumping minimum rate, trouble shoot, tag up 9/2012017 9/20/2017 2.20 PROD5 STK PULD P Continue to trouble-shoot choke issue. 72.0 0.0 21:00 23:12 Decison made to PUD, then continue to trouble shoot issue once on MP, checks not holding, continue PUD, open & cleaned choke A & B (significant large, rounded, shale - pieces & aluminum in both chokes) 9/20/2017 9/2112017 0.80 PRODS STK PULD P Reconfigure BHA, PJSM, PD BHA# 0.0 50.0 23:12 00:00 1 I I 41 (New B8 XD Edge bit, motor, 69 hr agitator), Page 48161 Report Printed: 912712017 Operations Summary (with Timelog Depths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tioie Log sw oapth Start Time End Time Our thin Phase op Cede Activity Cada Time PJA operabon (nka) End Dept (flKB) 9121/201.7 9/21/2017 1.60 PRODS STK PULD P Continue PD BHA #41, pump across 50.0 78.0 00:00 01:36 the top, choke A & B operating as expected, change out checks, slide in cart, stab on, tag up, EDC closed 9/21/2017 9/2112017 2.50 PRODS STK TRIP P RIH with BHA #41, surface test 78.0 12,595.0 01:36 04:06 agitator, good, observe eratic choke swings though appears to clear up; possible cuttings from down -hole, nothing unusual observed over shakers 9/21/2017 9/21/2017 0.20 PRODS STK DLOG P Log K1 for+2.5' correction 12,595.0 12,632.0 04:06 04:18 9/21/2017 9/21/2017 0.30 PRODS STK RGRP T Park at 12,632' (install new seats mud 12,632.0 12,632.0 04:18 04:36 pump #2), PUW = 32K 9/21/2017 9/21/2017 0.30 PRODS STK TRIP P Continue RIH, stack -9K WOB at 12,632.0 12,820.0 04:36 04:54 window, PU, drop rate, RBIH without issue, log RA tag for 0' correction 9/21/2017 9/21/2017 0.20 PRODS STK KOST P Dry tag 12,820.5', RBIH to continue 12,819.4 12,819.4 04:54 05:06 milling, pumping 1.7 bpm, FS = 1323 psi, circ pressure = 5321 psi, CWT =11 K, WOB = .22K, Start milling @ 12819.4 9/21/2017 9/21/2017 1.00 PRODS STK KOST P Milling off billet, 1.69 BPM @ 5011 12,819.4 12,821.0 0506 06:06 PSI FS, BHP=3935, 1 FPH, 9/21/2017 9/2112017 0.50 PRODS DRILL DRLG P Go to 10-15 FPH, 1.7 BPM @ 5011 12,821.0 12,828.0 06:06 06:36 PSI FS, BHP=3990 9121/2017 9/21/2017 0.70 PRODS DRILL DRLG P 12,828', Drill ahead, 1.7 BPM @ 5011 12,828.0 12,870.0 06:36 07:18 PSI FS, BHP=3935, RIW=10K, DHWOB=1.9K 9/21/2017 9/21/2017 0.10 PRODS DRILL WPRT P 12870, PUH to drift billet area, 12,870.0 12,870.0 07:18 07:24 PUW=33K, Stack on billet @ 20L, clean @ 30L, RBIH to drill 9/21/2017 9/21/2017 1.40 PRODS DRILL WAIT T Pull off bottom - exploring different 12,870.0 12,870.0 07:24 08:48 well plan options - Ream billet area, Dry drift clean 9/21/2017 9/21/2017 2.50 PRODS DRILL DRLG P Drill ahead working WP4, 1.79 BPM 12,870.0 13,230.0 08:48 11:18 @ 5430 PSI FS, BHP=3960 9/21/2017 9/21/2017 2.90 PRODS DRILL TRIP P - Call end of build, Pump sweeps, Trip 13,230.0 78.0 11:18 14:12 out for lateral BHA, PUW=31 K 9/21/2017 9/21/2017 1.40 PRODS DRILL PULD P At surface, PJSM, PUD BHA #41 78.0 0.0 14:12 15:36 9/21/2017 9/21/2017 1.90 PRODS DRILL PULD P PIU New bit, C1 with 3D cutters, .5° 0.0 78.0 15:36 17:30 motor, and agitator. PD BHA #42 AU lateral drilling BHA. Make up to coil ' and surface test. Check packoffs 9/21/2017 9/21/2017 2.50 PRODS DRILL TRIP P RIH, surface test agitator, good, stack 78.0 12,595.0 17:30 20:00 weight on GLM at 3,533'. PU, reorient TF, continue in-hole 9/21/2017 9/21/2017 0.20 PRODS DRILL DLOG P Log KI for+4.5' correction 12,595.0 12,635.0 20:00 20:12 9/21/2017 9/21/2017 0.40 PRODS DRILL TRIP P Continue RIH 12,635.0 13,230.0 20:12 20:36 9/21/2017 9/21/2017 2.80 PRODS DRILL DRLG P OBD, FS= 1130 psi, CWT =8K, WOB 13,230.0 13,630.0 20:36 23:24 = 1.5K, rate in = 1.75 bpm, BHP = 3987 psi, pump sweeps, average ROP over interval = -143 fph 9/21/2017 9/21/2017 0.30 PRODS DRILL WPRT P WT up -hole, PUW = 32K 13,630.0 12,879.0 23:24 23:42 Page 49/51 Report Printed: 9/27/2017 Dvil Operations Summary (with Timelog L)epths) 3M-27 CtxtocoPlhilli Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tifie Log start Depth T une End T me our (hr) Phase op Code Atlivity code Tme P-T-X Operetlon (111(8) End Depth (KKB) 9/2112017 9/22/2017 0.30 PRODS DRILL WPRT P WT in-hole, RIW=6K 12,879.0 13,630.0 23:42 00:00 9/22/2017 9/22/2017 3.80 PRODS DRILL DRLG P BOBO, FS = 1190 psi, pumping 1.78 13,630.0 14,051.0 00:00 03:48 bpm, CWT = 4.5K, WOB = 1.5K, BHP = 3964 psi, circ pressure = 5399 psi. Begin swapping to mud System #7 at 13,760', new mud at the bit at 13,816', pump sweeps, ROP over interval = 111 fph 9/22/2017 9/22/2017 0.50 PRODS DRILL WPRT P Wiper up-hole, PUW=35K 14,051.0 13,050.0 03:48 04:18 9/2212017 9/22/2017 o.40 PRODS DRILL WPRT P Wiper in-hole, RIW = 8K 13,050.0 14,051.0 04:18 04:42 9/22/2017 9/22/2017 1.20 PRODS DRILL DRLG P BOBD, FS = 1120 psi, pumping 1.8 14,051.0 14,182.0 04:42 05:54 bpm, CWT = 4.7K, WOB = 1.3K, BHP = 3952 psi 92212017 9/22/2017 0.10 PRODS DRILL WPRT P 14182', BHA Wiper, PUW=37K 14,162.0 14,182.0 05:54 06:00 9/22/2017 9/22/2017 0.90 PRODS DRILL DRLG P 141821, Drill, 1.79 BPM @ 5105 PSI 14,182.0 14,275.0 06:00 06:54 FS, BHP=4010, RIW=2.2K, DHWOB=I.9K 9/22/2017 9/22/2017 0.10 PRODS DRILL WPRT P 14275', BHA wiper, PUW=37K 14,275.0 14,275.0 06:54 07:00 9/222017 9/22/2017 1.40 PRODS DRILL DRLG P 14275', Drill, 1.79 BPM @ 5105 PSI 14,275.0 14,425.0 07:00 08:24 FS, BHP=4015 9/22/2017 9/22/2017 3.40 PRODS DRILL WPRT P 14425 call TO, Chase 10 X 10 BBL 14,425.0 78.0 08:24 11:48 sweeps to swab valve, PUW=35K 9/222017 9/22/2017 PRODS DRILL WPRT P Tag up at surface, reset counters, Trip 78.0 12,595.0 11:48 11:48 in hole 9/22/2017 9/222017 2.20 PRODS DRILL DLOG P Log K1 for +1.5' correction, PUW=35K 12,595.0 12,627.0 11:48 14:00 9/22/2017 91222017 1.50 PRODS DRILL WPRT P Continue in hole, clear pass through 12,627.0 14,427.0 14:00 15:30 window, set down @ 12618 at 20 left, went to 30L clean past 9/22/2017 9/22/2017 3.50 PRODS DRILL CIRC P Tag 14427' corrected, Trip out 14,427.0 78.0 15:30 19:00 pumping 12 PPG beaded liner pill followed by 12 PPG completion fluid. Paint EOP flags @ 12400,10400' 9/22/2017 9/2212017 1.50 PRODS DRILL PULD P Flow check well, good, PJSM, LD 78.0 0.0 19:00 20:30 BHA #42 (Cl bit came out a 2-1) 9/222017 9/22/2017 2.90 COMPZ5 CASING PUTB P PJSM, PU AL3 liner (non-ported bull- 0.0 1,871.0 20:30 23:24 nose, 47 jnts slotted liner, & shorty deployment sleeve), BOP Drill "Running Liner' 9/22/2017 9/23/2017 0.60 COMPZS CASING PULD P PJSM, PU BHA#34, AL3 Liner 1,871.0 1,915.0 23:24 00:00 Running Tools 9123/2017 9/23/2017 0.70 COMM CASING PULD P Continue PU BHA #43, replace 1,915.0 1,915.0 00:00 00:42 checks, move in cart, MU to coil 9/2312017 9/23/2017 3.00 COMM CASING RUNL P RIH with BHA #43, tie into window flag 1,915.0 14,427.0 00:42 03:42 for+8.5' correction, weight check at window = 31 K Set downs at 13,920', 14,157', - 14,267',14,3a4', &14,397' Tied into TO flag for 0' correction, arrive at setting depth, weight check = 40K, bring up pumps, release off liner, TOL=12,556' Page 50151 Report Printed: 912712017 Operations Summary (with Timelog Liepths) 3M-27 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Shan Time End Time Die fr) Phase Die Code Afitr cede Time P -T -X Operation (MG) End Depth(ftKB) 9/23/2017 9/23/2017 0.40 COMPZ5 CASING DLOG P Obtain SBHP, tool MD = 12,546', tool 14,427.0 12,541.0 03:42 04:06 TVD = 6,072', annular reached 3774 psi after 20 minutes, 11.95 ppg equivalent. 9/23/2017 9/23/2017 3.80 COMPZ5 CASING TRIP P Begin pumping seawater down coil, 12,541.0 12,541.0 04:06 07:54 displace well to seawater, diesel freeze protect from 2500' 9/23/2017 9/23/2017 1.40 COMM CASING PULD P Al surface, PJSM PUD BHA #43, 12,541.0 53.0 07:54 09:18 Liner running tools, lay down tools and pull checks from UQC 9/23/2017 9/23/2017 0.70 DEMOB WHDBOP RURD P Stab back on. Flush rig and jet stack, 0.0 0.0 09:18 10:00 unstab from well 9/23/2017 9/23/2017 1.50 DEMOB WHDBOP MPSP P PJSM, R/U BPV lubricator, set BPV, 0.0 - 0.0 10:00 11:30 test plug. RID BPV lubricator and load out 9/23/2017 9/23/2017 4.50 DEMOB WHDBOP WIND P Start working RDMO check list, empty 0.0 0.0 11:30 16:00 pits, Nipple down stack, Check tree bolts Page 61161 Report Printed: 9127/2017 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL3 50.029-22637-63 Baker Hughes INTEQ Definitive Survey Report O6 October. 2017 BA ER F�UGHES E company ConocoPhillips ConocoPhillips Definitive Survey Report • Company: ConocoPOilips(Aleske) Inc.-Kup2 Local Co-ordinate Reference: Well 31,11-27 Prop": Kuparuk River Und ND Reference. 3M-27®6800usb(3M-27) Sfta: Kupamk 3M Pad MO Reference: 3M-27 III 68.00use(3M-27) Well, 3M-27 North Reference: True Wetmore: 3M-27 Survey Calculation Method: Minimum Curvmure Design: 3M-27 Database. EDTAIaska Sandici Proem Ki,xi River Unit. Norm Slope Alaska, United &ekes Map System: US State Plane 1927(Exact solution) System Datum: Mean Sea Level Old Datum: NAD 1927 (NADCON CONUS) Using Well Reference Port Map Zone: Alaska Zona 04 Using geodetic scale factor Well 3M.27 Well Position +W4 0.00 uaft Northing: 6,016,6NE124usfl LOtltude: 70°27'23,7WIN +El-W 0.00 usit Easting: 506,294.30 uaft Longitude: 149" 56' 55.073 W Poamon UncertaiMY 0.00 end Wellhead Elevation: unit Ground Level: 0 00 usfl Wellbore 3M-27AL3 Margaret. Model Name Sample Dale Declinations Dn An9N FWd3t.n th (°) 11I (nT) WGM2016 7/1/2019 17.53 8100 57,543 Design 3111 Audit Notes: version: 10 Phase: ACTUAL Tie On Depth: 12,811.56 Vertical Section: Depth From(TVD) +W4 +eUW Direction (ugh) (uaN) loan) r) 6500 000 000 200.00 Survey Program Deb 9/25/2017 From TO Survey Survey lush) (ugh) Survey(WNlbota) Tool Nene Description BMR Data End Date 26500 12,692.45 3M-27 (3M-27) MWD MWO-Standard 1/15/2001 12,712,50 12,746.03 3M.27A MWD,1NC(3M-27A) MWD-INC ONLY MW41NC_ONLY FILLER 811011017 &18121117 12,778.47 12.8115% 3M-27A MWD(3M-27A) MWD MWD-Standard &1812017 M6=17 12.817.00 14,375.37 3M-27A-3 MWD(3M-27AL3) MWD MWD Standard 9119/2017 982/2017 10, 0174:28:54PM PaW2 COMPASS 5000.14 Bak B5 11" ConocoPhillips Coni Definitive Survey Report Domesday: ConowlPbillips(AIesW) Inc.-Kup2 Local Co-oninate Retennce: We113M-27 Postism Kupamk Riwr Unit TVD Reference 3M.61®66.00use(3M@7) 3b: Kupamk 398 Pad MD Reticence: 3M-27 ® 60.00us6 (3M-27) MO: 3M-27 Nonb Reference: Tone Wellbore: 3M-27 Survey Calculation Merced Mlnimun CurvaW. Design: 3M 27 Database: EDTMaska Sandbox Annotation TIP KOP fOW017 4.28:54PM Papa 3 COMPASS 5000.14 SW3d 85 Map Map vertical MD Me Ari TVD TVDSS 40043 .0-W Nanning Eastin9 DIS Section Survey Tool Name (usR) (') P) (MSR) (oft) (age) (oft) (M (721f-1108.) m) 12,81158 M43 27396 8,250.80 5,180.ed 235828 .,.a 6019,15585 49632&10 56.10 1,00424 MNDI3) 12,611. 8618 275.94 6.25900 6.19100 2558.78 b.97044 0.019.156.32 496322.69 sit 1005.85 MM (4) 12845.58 9256 27051 6,25924 8,191.24 2.66aW -0.998.85 8,019,16790 496,204.19 30.11 1,01309 MM (4) 1287557 9470 202.77 625726 ole9.R 2,558.81 -10p28.80 8,018,158.12 496264.34 W47 1,Me 74 MYA (4) 1290573 8888 258.52 8.256.53 6188.53 2.553.20 -10,058.43 8,019,150.88 496.234.72 3022 1.04097 MWD (4) 12,036.1 8129 24881 8,256.70 8,10870 2.&4.32 -10,086.93 6,019.141.79 496,208.23 27.88 1,059.05 MWD (4) 12.96581 90A9 24167 8,25623 6,188.23 2,531]9 -10,11417 6.01snM24 496,17901 2428 1,MO 14 MWD (4) 12,99675 .05 23331 am 85 6187.85 2,51561 -10,139.50 5,019.11303 496,15363 27.78 1.104.03 MWD (4) 13.02893 9133 225.44 8.25528 6,18726 2.495.33 -1016320 6.019,092.73 498.130.01 25.25 1,131.18 MJA (4) 13,05605 Not 216. 6254.79 CIN 70 20373 -1018271 6.019,071,12 498.11053 23.10 1.158.14 MM(4) 13.m 02 W37 21054 6.254.53 6.188.63 2,449.10 -10.19973 6,019,04848 488.09353 2737 118711 MWD(4) 13,115.57 9183 20233 8,254.02 8.189.02 2,422.87 -10,21207 6,019,02003 498,080.41 28.10 1.216.45 MM (4) 13,148.33 90.71 19296 6.25339 8.105.39 2393.39 -IsMA8 8,018,88078 496,071.12 33Eo 1,247.14 MWD(4) 13.175.0 9320 1!8.00 6,252.37 6,184.37 2364.67 -10.22700 outs90203 allows 33 25.18 1.27577 MM (4) 13,205.52 90.56 176,80 6,25128 8.18328 2334.71 -10.91775 6.018,932,07 406.085.81 310 1,304.19 MWD(4) 13,233.02 "52 17025 6.25141 6.18344 230442 -10.M4,31 8.018,901 ]9 498,069.07 mw 1.331.47 MM (4) 13,268.37 08.95 17375 6.252.16 8.184.16 2.27240 -10.219.81 8,018,889.77 490073.58 1080 1,350.03 MWD(4) 13,29703 8813 178.07 6,25281 8.184.81 224356 10,21727 6.018.841.24 495.07618 038 1,38597 MWD(4) 13,328.02 8779 179.19 8353.77 8.18577 2.214.91 -10.216.07 6ot8,812.30 45607738 10.88 1,41276 MWD (4) 13.355.65 86.0 18228 8,2MM 8,18726 218533 -10,21845 6.018,782.72 495,071,03 11.38 1,44089 MWD (4) 13386.38 0607 18603 0,25700 olsoc0 2.165 II -10,21&80 6.018.753 11 496.07490 12.67 1.46935 111 (4) 1341577 8890 186.29 8,258.12 8.190.12 2,125.54 -10,221.86 6,018.M283 49807167 874 149873 MND (4) 13.446.14 88.54 18256 8.258.54 8.18054 2,005.27 -10,224M 6,01B.'som 496,34835 12.48 1.527.97 MND (4) 1347549 90.15 18108 6.25882 510082 2,085.93 -10,22513 0tigmas 498.058.45 5.45 1.55556 MM(4) 13.50.42 0015 17949 0.25. 6,1M)54 2.03601 -$22520 6.019.03.10 assess 32 5.31 1,68403 MNO (4) 13,53555 9129 17895 8.250.16 6,190.16 205.90 -10.224.35 6,018,60300 408,0892. 824 1,81201 MND (4) 13.58557 9345 175.31 8,258.92 818892 1,87597 -78,222.32 8,.18,73.38 498,07133 903 1.839.43 MWD(4) 13506.38 93.72 17156 6.25499 6.156.99 1,94543 -10.218.81 6,018,54284 498,07487 12.10 1%593 MND(4) 13.627.38 94.37 170.50 6,25280 6.184.00 1,81489 -10,21309 B,o10,51231 493,07972 400 1693.96 MM (4) 1865530 0335 17364 8250W 6182.92 188722 -10.210.13 8.018.484.65 498,083.80 11.77 1718W MM (4) Annotation TIP KOP fOW017 4.28:54PM Papa 3 COMPASS 5000.14 SW3d 85 III ConocoPhillips • COnOCOPQIlllps Definitive Survey Report Company C...Phllilps(Alaskal Inc.-Kup2 Local Co dinate Reference: Mil 3M-27 Project: KuPemk River Und TVD Reference: 3M-27@68.00usR(3M-27) $an Kupemk 3M Pad MD Reference: 3M.27 ({Q 68,00usl1(3M@7) Well: 3M-27 North Rd....: True Wellbore 3M-27 Survey Cumulation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Map Map br5wl MD Inc Alai ND NOBS eW3 ell -W NORhin9 Email" DLS acecn Suryd Nit ey Tore Annotation (nen) 0 (') (Iran) (usR) tusR) (usft) (n) IRI C/low) IR) 13,60538 9415 17432 6,24895 8,180. 1,115767 -10.20701 6018.45500 486,088]5 3.51 1]4646 MND(4) 13,716.03 9375 177.29 8246.84 8.178.84 1.82856 -10.204.76 8,018,42439 49,08902 972 171345 MWO(4) 13.745.75 9089 17732 6245. 8,17764 1,70730 -,amm 6,018.38474 49080.44 9.62 1,800.85 MWO(4) 1377525 89.M 178.07 8.24559 8,117.59 1767.82 -10.20218 &018.38537 49,09165 580 182814 MM (4) 13.805.61 8865 18001 8,246.13 0,178.13 1,73747 -10,20187 6,018,3.492 49.08210 6.76 1656.46 MWD(4) 13,83533 8957 184.63 8,248.69 8,178% 1,70779 40.202.85 6,018.305.24 49.09103 1552 1804.78 MM (4) 13,88554 9092 18595 6346.46 5.17848 1,871.71 -10,2961 8,018,27516 4908830 6.49 1.91399 MM (4) 13,88563 91.10 1.41 8245. 6,1779 i'mW -10,208.61 6.018.245 44 495.084.32 1165 194328 MM (4) i 13,92497 91II 192.09 6.24520 6.17720 181908 -10,21510 6,0182160 496,078.9 9.34 1.47233 AM (4) 13,85561 971 1942 8.241.56 8,176.56 1.589.40 -10.m. 8,018,1905 49807134 14.51 2,9280 MVA(4) 1388557 8773 19.08 6.2449 6.176.9 1,56081 -10$31.02 8.018,158.9 498.92.98 10.01 2.032% MM (4) 14,015.53 80.26 29.17 6.246.01 6.17801 1.0210 -10,24034 8,018,129.63 499370 1375 2,06261 MM (4) I 14,04525 8874 20281 6.248.79 6,17870 1,501.55 -10,251.22 6.018.401.88 49.042.84 9.03 2,09231 MM (4) 14,077.88 88.9 205.95 6.247.45 6.17945 1,474.84 -10.26.9 8.0180M.26 49029.40 964 2,12463 MM (4) i 14,10539 8828 20748 6247.88 8.17968 1.450.27 -10,277.9 6.01&01780 4..417 ,06 567 2.152.15 SIM (4) 14135. 8854 210.71 6,244.19 8j. 19 1,424.32 -10,281A9 8.016,021.73 49,002.84 10.92 2.18147 MVA) (4) 1416533 90.81 21445 6.248.14 6,180.14 1,398.85 -10,80777 8017,9924 495,99.38 1288 2,210. MNA(4) 1419530 9216 21765 631140 8.17040 137463 10,325.40 8,017,9M.01 485,06870 11.85 2,23877 MVA(4) 14225.38 93.28 21967 6.215.87 6.177.97 1,351.17 -10.344.17 6.017,948.53 495,950 03 764 2,28823 MWD (4) 1425513 9422 M223 6,243.84 8,17584 1,328.76 -1093.61 6,017,92511 485930.61 1020 SNOW MWD (4) 14,285.12 9341 22315 6.24169 8.173.9 1,3977 -10,38399 8,0174.4.11 495,91035 689 2,32353 M (4) 14,31507 0375 226 Be "a 8.17138 128541 -10.404]9 6.017.882.73 495.88947 8.18 2,350.76 MAD(4) 14,345211 93.91 32&36 0.23777 8.169.77 1,254.90 -10,42897 8017,9220 405,867.51 920 2,377% MWD(4) 14,37637 9448 231.5 6,235.% 6,19.56 1.245.54 -10.44979 6,017.8,062 49,844.50 10.46 2.403.62 MWD (4) 14.427. 94.46 2315 6,23155 8,15 .55 1,21349 -104... 6,017.81075 498M.25 0. 2,44751 PRQ)ECTEDWTD 10.6[017 4:28'54PM Page 4 COMPASS 5000.14 Budd 85 RECEIVED OCT 16 2017 AOGCC BA ER UGHES a GE company To: Letter of Transmittal Date: NUE LoGED October 16, M K 9ENUE2017 CD in 217-053 R Makana Bender AOGCC 333 West 711 Ave, Suite 100 Anchorage, Alaska 99501 From: Yosha Ragbirsingh / Michael Soper Baker Hughes, a GE Company 795 East 9411 Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3M -27A 3M-27AL1 3M-27AL2PB1 3M-27AL2 3M-27AL2-01 3M-27AL3 2A -22A 2A-22AL1 (8) Total prints 217-053 28680 217-054 28681 217-055 28682 217-055 28683 217-056 28684 217-057 28685 Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael.Soper@BHGE.com Yosha Ragbirsingh, Baker Hughes, Survey Manager ConocoPhillips RECEIVED OCT 16 2017 AOGCC ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL3 F�iaiYbi��E� Baker Hughes INTEQ Definitive Survey Report 06 October, 2017 217-057 28685 BAT(ER UGHES a GE company ConocoPhillips 6AES (ER ConocoPhilli p s Definitive Survey Report �G" Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27 Design: 3M-27 Project v Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3M-27 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well Position +N/ -S 0.00 usft Northing: Survey +E/ -W 0.00 usft Easting: Position Uncertainty Start Date 0.00 usft Wellhead Elevation: Wellbore 3M-27AL3 1/15/2001 12,746.03 Magnetics Model Name MWD-INC—ONLY—FILLER Sample Date Design Audit Notes: Version: Vertical Section: Survey Program From (usft) 265.00 12,712.50 12,778.47 12,817.00 BGGM2016 3M-27AL3 1.0 Phase: ACTUAL Depth From (TVD) (usk) 68.00 Date 9/25/2017 7/1/2017 Well 3M-27 3M-27 (03 68.00usft (3M-27) 310-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,016,606.24usft 506,294.30usft usft Declination (I 17 53 Tie On Depth: 12,811.56 *NIS (usft) 0.00 +E/ -W (usft) 0.00 Latitude: Longitude: Ground Level: Dip Angle (1) 81.00 70° 27'23.753 N 149° 56'55,073 W 0.00 usft Field Strength h1n 57,543 Direction (1) 200.00 TO Survey (usft) Survey (Wellbore) Tool Name Descrippon Start Date 12,69245 3M-27 (310-27) MWD MWD -Standard 1/15/2001 12,746.03 3M -27A MWD-INC(3M-27A) MWD-INC_ONLY MWD-INC—ONLY—FILLER 8/18/2017 12,811.56 3M -27A MWD (3M -27A) MWD MWD- Standard 8/18/2017 14,375.37 3M-27AL3 MWD(3M-27AL3) MWD MWD -Standard 9/19/2017 a Survey End Data 9 8/18/2017 8/26/2017 v 9/22/2017 = 10/62017 4:28.54PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips 0 Definitive rt ConocoPhillipsUNES efinitive Survey Repo Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 (a] 68.00usft (3M-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey I I Map Map Vertical 9 MD Inc Azi TVD NDSS +N/ -S +El -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100') Survey Tool Name Annotation (ft) (ft) (ft) 1 12,81156 85.43 273.96 6,258.60 6,190.60 2,558.29 -9,965.04 6,019,155.85 496,328.10 56.16 1,004.24 MWD (3) TIP i 12,817,00 86.18 275.94 6,259.00 6,191.00 2,558.76 -9,970.4 6,019,155.32 496,322.69 38.83 1,005.65 MWD (4) KOP 12,845.58 92.86 27051 6,25924 6,191.24 2,560.36 '9,998.95 6,019,15790 496,29419 30.11 1,013.89 MWD(4) 12,875.57 94.70 262.77 6,257.26 6,189.26 2,558.61 -10,028.80 6,019,15012 496,264.34 26.47 1,025.74 MWD (4) 12,905.73 88:06 256.52 6,256.53 6,188.53 2,553.20 -10,058.43 6,019,150.68 496,234.72 3022 1,040.97 MWD (4) 12,93561 91.29 248.91 6,256.70 6,188.70 2,544.32 -10,086.93 6,019,14179 496,206.23 2766 1,059.05 MWD (4) 12,965.61 90.49 24167 6,256.23 6.88.23 2,531.79 -10,114.17 6,019,129.24 496,179,01 2428 1,080.14 MWD (4) � 12,995.75 90.95 233.31 6,255.85 6,187.85 2,51561 -10,139.55 6,019,11303 496,153.63 27.78 1,104.03 MWD (4) 13,026.93 9123 225.4 6,255.26 6,187.26 2495.33 -10,163.20 6,019,092.73 496,130.01 25.25 1,131.18 MWD (4) 13,056.05 9061 218.74 6,254.79 6,186.79 2,47373 -10,182.71 8,019,071.12 496,110.53 23.10 1,158.14 MN1D(4) 1((( 13,086.02 90.37 210.54 6,254.53 6,18653 2,449.10 -10,199.73 6,019,046.48 496,093.53 27.37 1,187.11 MWD (4) p 13,115.57 91.63 202.33 6,254.02 6,168.02 2,422.67 -10,212.87 6,019,020.03 496,08041 28.10 1,216.45 MWD (4) 73 13,146.33 90.71 192.% 6,253.39 6,185.39 2,393.39 -10,222.18 6,018,99076 496,071.12 30.60 1,247.14 MWD (4) 4 13,175.49 93.29 186.08 6,252.37 6,184.37 2,35467 -10,227.00 6,018,962.03 496,06633 25.18 1,275,77 MWD (4) 13,205.52 90.86 176.80 6,251.28 6,183.28 2,334.71 -10,227.75 6,018,932.07 496,06561 31.92 1,304.19 1(4) 13,2 c2 88.52 170.25 6,251.44 6,183.44 2,304.42 -10,224.31 6,018,90179 496,069.07 22.80 1,331.47 MM (4) 13,268.37 88.95 173.75 6,252.16 6,184.16 2,27240 -10,219,81 6,018,869.77 496,073.59 10.90 1,360.03 MWD (4) 13,297.03 88.43 176.07 6,252.81 6,184.81 2,243.86 -10,217.27 6,018,841.24 496,076.16 8.29 1,385.97 MWD (4) 13,326.02 87.79 179.19 6,253.77 6,185.77 2,214.91 -10,216.07 6,018,81230 496,077.38 10.98 1,412.76 MWD (4) E 13,35565 86.43 182.28 6.255.26 6,187.26 2,185.33 -10,216.45 6,018,782.72 4960]].03 11.38 1,440.69 MWD (4) 13,385.39 86.87 186.03 6,257.00 6,189.00 2,155.72 -10,218.60 6,018,753.11 496,074.90 12.67 1,469.25 MWD (4) i 13,41577 88.90 186.29 6,258.12 6,190.12 2,125.54 -10,221.86 6,018,722.93 496071.67 6.74 1,498.73 MWD (4) 13,446.14 89.54 182.56 6,258.54 6,190.54 2,095.27 -10,224.20 6,018,692.66 496069.35 12.46 1,527.97 MWD (4) i 13,475.49 90.15 181.08 6,258.62 6,193.62 2,065.93 -10,225.13 6018,663.33 496,068.45 5.45 1,555.86 MWD (4) 13,505.42 90.15 179.49 6,258.54 6,190.54 2,036.01 -10,225.28 6,018,633.40 496,068.32 5.31 1,584.03 MWD (4) ( 13,535.55 91.29 176.95 6,258.16 6,190.16 2,005.90 -10,224.35 6,018.603.30 496,069.28 9.24 1,612.01 MWD (4) 13,565.57 93.45 175.31 6,255.92 6,188.92 1,975.97 -10,222.32 6,018,57338 496,071.33 9.03 1,639.43 MWD (4) 13,596.38 93.72 171.56 6,254.99 6,186.99 1,94543 -10,218.81 6,018,542.84 496074.87 12.18 1,666,93 MWD (4) I 13,627.38 94.37 170.50 6,252.80 6,184.80 1,914.89 -10,213.99 6,018,512.31 496,079.72 4.00 1,693.98 MWD (4) 1 13,655.38 93.35 173.64 6,25092 6,162.92 1,887.22 -10,210.13 6,018,484.65 496,083.60 11.77 1,718.66 MWD (4) 10/872017 4:28:54PM Page 3 COMPASS 5000.14 Build 85 10/62017 4:28:54PM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips eA ER ConocoPhillips n `•GHFS Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 , Project: Kuparuk River Unit ND Reference: 3M-27 @ 68.00usft (3M-27) Site: Kupamk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey Map Map vertical MD Inc AzI ND NDSS +NI -S +E/ -W OILS (usft) (°) (•) (usft) (usft) (usft) (usft) Northing Easting (°(100') Section Survey Tool Name Annotation (ft) (ft) (ft) 13,685.26 94.15 174.32 6,248.96 6,180.96 1,857.57 -10,207.01 6,018,45500 496,08675 3.51 1,745.46 MWD (4) 13,716.03 93.75 177.29 6,246.84 6,178.84 1,826.96 -10,204.76 6,018,424.39 496,069.02 9.72 1,773.45 MWD (4) 13,745.75 90.89 177.32 6,245.64 6,177.64 1,797.30 -10,203.36 6,018,394.74 496,090.44 9.62 1,800.85 MWD (4) 13,775.25 89.32 178.07 6,245.59 6,177.59 1,767.82 -10,202.18 6,018,365.27 495,091.65 5.90 1,828.14 MWD (4) 13,805.61 88.65 180.01 6,246.13 6,178.13 1,737.47 -10,20167 6,018,334.92 496,092.19 6.76 1,856.48 MWD (4) 13,835.33 89.57 184.53 6,246.59 6,178.59 1,707.79 -10,202.85 6,018,305.24 496,091.03 15.52 1,884.78 MWD (4) 13,865.54 90.92 185.95 6,246.46 6,178.46 1,677.71 -10,20561 6,018,275.16 496,088.30 649 1,913.99 MWD (4) 13,895.53 91.10 189.41 6,245.93 6,177.93 1,648.00 -10,209.61 6,018,245.44 496,084.32 11.55 1,943.28 MWD (4) 13,924.97 91.72 192.09 6,245.20 6,177.20 1,619.08 -10,215.10 6,018,216.53 496,078.86 9.34 1,972.33 MWD (4) 13,95561 9071 196.42 6,244.55 6,176.55 1,589.40 -10,222.64 6,018,186.85 496,071.34 14.51 2,002.80 MWD (4) 13,985.57 87.73 196.08 6,244.96 6,176.96 1,560.64 -10,231.02 6,018,15808 496,062.98 10.01 2,032.69 MWD (4) 14,015.53 88.25 200.17 6,246.01 6,178.01 1,532.19 -10,240.34 6,018,129.63 496,053.70 13.75 2,062.61 MWD (4) 14,045.25 88.74 202.81 6,246.79 6,17879 1,504.55 -10,251.22 6,018,101.98 496,042.84 9.03 2,092.31 MWD(4) 14,077.88 88.96 205.95 6,247.45 6,179.45 1,474.84 -10,264.68 6,018,072.26 496,029.40 9.64 2,124.83 MWD (4) 14,105:39 89.26 207.48 6,247.88 6,179.88 1,450.27 -10,277.05 6,018,047.68 496,017.06 5.67 2,152.15 MWD(4) 14.135.09 89.54 21071 6,248.19 6,180.19 1,424.32 -10,291.49 6,018,021.73 496002.64 10.92 2,181.47 MWD (4) 14,165.33 9064 214.45 6,248.14 6,180.14 1,398.85 -10,307.77 6,017,996.24 495,986.38 12.89 2,210.98 MWD (4) S 14,195.30 92.18 217.65 6,24740 6,179.40 1,374.63 -10,325.40 6,017,972.01 495,968.78 11.85 2,239.77 MWD (4) 14,225.38 93.28 219.67 6,245.97 6,177.97 1,351.17 -10,344.17 6,017,948.53 495,950.03 7.64 2,268.23 MM (4) 14,255.13 94.92 222.23 6,243.84 6,175.84 1,328.76 -10,363.61 6,017926.11 495,93061 1020 2,295.94 MWD (4) 14,285.12 93.41 223.15 6,241.66 6,173.66 1,306.77 -10,383.89 6,017,904.11 495,910.35 5.89 2,323.53 MWD (4) 14,315.07 93.75 225.58 6,239.79 6,17179 1,285.41 -10,404.79 6,017,882.73 495,889.47 8.18 2,350.76 MWD (4) 14,345.20 93.94 228.38 6,237.77 6,169.77 1,264.90 -10,426.77 6,017,862.20 495,867.51 929 2,377.55 MWD (4) 14,375.37 94.46 231.50 6,235.56 6,167.56 1,245.54 -10,449.79 6,017,842.82 495,844.50 10.46 2,403.62 MWD (4) I 14,427.00 94.46 231.50 6,231.55 6,163.55 1,213.49 -10,490.08 6,017,810.75 495,804.25 0.00 2,447.51 PROJECTED to TD 10/62017 4:28:54PM Page 4 COMPASS 5000.14 Build 85 BAM,.0 HES 0PRINT DISTRIBUTION LIST a GE company COMPANY ConocoPhilli Is Alaska, Inc. WELL NAME 3M-27AL3 RECEIVE FIELD Greater Kuparuk Area OCT 13 2011 COUNTY North Slope Borough A EG)G C BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(cDbakerhughes.com STATUS Final Replacement: No COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V t !BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ! ConocoPhillips Alaska Inc. Attn: Tom Osterkamp ATO 3-344 700 G Street (Anchorage, AK 99510 3 Exxon Mobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Atm: Makana Bender 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas a*• Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 6 B Exploration (Alaska) Inc. Petrotechnical Data Center, 1R2-1 900 E. Benson Blvd Anchorage, Alaska 99508 11 7057 28660 Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp (WNS Petroleum Technician 700 G Street. D TA LOGGED O / 1,3/2071 Anchorage, Alaska 99510 M. K. BENDER to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE September 22, 2017 TODAYS DATE October 11, 2017 Revision Details: Rev. Requested by: -- FIELD I FINALCD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES 1# OF COPIES I# OF COPIES 10 0 1 0 1 0 1 0 10 0 1 0 1 0 1 0 10 TOTALS FOR THIS PAGE: 0 2 3 3 0 ConocoPhillips RECEI`l OCT 13 2017 &,OGM ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27AL3 50-029-22637-63 Baker Hughes INTEQ Definitive Survey Report 06 October. 2017 BAER UGHES a GE company 21 7057 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc.-Kup2 Local Coordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kupamk 3M Pad MD Reference: Well: 3M-27 North Reference: Wellbore: 3M-27 Survey Calculation Method: Design: 3M-27 Database: Project Kuparuk River Unit, North Slope Alaska, United States Well 3M-27 3M-27 @ 68.00usft (310-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature EDT Alaska Sandbox Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Audit Notes: Using Well Reference Point Map Zone: Alaska Zone 04 1.0 Using geodetic scale factor Well 3M-27 .. - .., _..._. _._, ....� Well Position +N/ -S 0.00 usft Northing: 6,016,606.24usft 68,00 +E/ -W 0.00 usft Easting: 506,294,30usft Position Uncertainty 0.00 usft Wellhead Elevation: usft Wellbore 3M-27AL3 Magnetics Model Name Sample Date Declination (1) 17.53 Tie On Depth: 12,811.56 +NiS +E/ -W (usft) (usft) 0.00 0.00 Tool Name BGGM2016 7/1/2017 Design 3M-27AL3 MWD-INC—ONLY—FILLER Audit Notes: MWD - Standard MWD Version: 1.0 Phase: ACTUAL Vertical Section: 8/26/2017 Depth From (TVD) 9/22/2017 (usft) 68,00 Survey Program Date 9/25/2017 From To (usft) (usft) Survey (Wellbore) 265.00 12,692.45 3M-27 (3M-27) 12,712.50 12,746.03 3M -27A MWD -INC (3M -27A) 12,778.47 12,811.56 3M -27A MWD(3M-27A) 12,817.00 14,375.37 3M-27AL3 MWD (3M-27AL3) Declination (1) 17.53 Tie On Depth: 12,811.56 +NiS +E/ -W (usft) (usft) 0.00 0.00 Tool Name Description MWD MWD - Standard MWD-INC_ONLY MWD-INC—ONLY—FILLER MWD MWD - Standard MWD MWD - Standard Latitude: Longitude: Ground Level: Dip Angle (1) 81.00 70' 27'21753 N 149° 56'55.073 W 0.00 usft Field Strength (nT) 57, 543 Direction ('1 200.00 Survey Survey Start Date End Dais 1/15/2001 8/18/2017 8/18/2017 8/18/2017 8/26/2017 9/19/2017 9/22/2017 1016@017 4: 26: 54PM Page 2 COMPASS 5000.14 Build 85 Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 3M-27 Project: Kuparuk River Unit TVD Reference: 3M-27 @ 68.00usft (310-27) Site: Kuparuk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey 10/672017 428r54PM Page 3 SA (ER �UGRLS Annotation TIP KOP COMPASS 5000.14 Build 85 Map Map Vertical MD Inc At, TVD TVDSS +N/ -S +EI -W Northing Easting DLS Section Survey Tool Name (usk) (°) (°) (usR) lush) (usft) (usR) (ft) (R) (°/100') (ft) 12,811.56 85.43 273.96 6,258.60 6,190.60 2,558.29 -9,965.04 6,019,155.85 496,328.10 56.16 1,004.24 MWD (3) 12,817.00 86.18 275.94 6,259.00 6,191.00 2,558.76 -9,970.44 6,019,156.32 496,322.69 38.83 1,005.65 MWD (4) 12,845.58 92.66 270.51 6,259.24 6,191.24 2,560.36 -9,998.95 6,019.157.90 496,294.19 30.11 1013.89 MWD (4) 12,875.57 9470 262.77 6,257.26 6,189.26 2,558.61 -10,028.80 6,019,156.12 496,264.34 26.47 1,025.74 MWD (4) 12,905.73 88.06 256.52 6,256.53 6,188.53 2,553.20 -10,058.43 6,019,150.68 496.234.72 30.22 7040.97 MWD (4) 12,935.61 91.29 248.91 6,256.70 6.188.70 2,544.32 -10,086.93 6,019,141.79 496,206.23 27.66 1,059.05 MWD (4) 12,965.61 90.49 241.67 6,256.23 6,188.23 2,531.79 -10,114.17 6,019,129.24 496,179.01 24.28 1,080.14 MWD (4) 12,995.75 90.95 233.31 6,255.85 6,187.85 2,515.61 -10,139.56 6,019,113.03 496153.63 27.78 1,104.03 MWD (4) 13,026.93 91.23 225.44 6,255.26 6,187.26 2,495.33 -10,163.20 6,019,092.73 496,130.01 25.25 1,131.18 MWD (4) 13,056.05 90.61 218.74 6,254.79 6.186.79 2,473.73 -10,182.71 6,019,071.12 496,110.53 23.10 1,158.14 MWD (4) 13,086.02 90.37 210.54 6,254.53 6,183.53 2,449.10 -10,199.73 6,019,046.48 496,093.53 27.37 1,187.11 MWD(4) 13,115.57 91.63 202.33 6,254.02 6,183.02 2,422.67 -10,212.87 6,019,020.03 496.080.41 28.10 1,216.45 MWD(4) 13,146.33 90.71 192.96 6,253.39 6,185.39 2,393.39 -10,222.18 6,018,990.76 496,071.12 30.60 1,247.14 MWD (4) 13,175.49 93.29 186.08 6,252.37 6,184.37 2,364.67 -10,227.00 6,018,962.03 496,066.33 25.18 1,275.77 MWD (4) 13,205.52 90.86 176.80 6,251.28 6,183.28 2,334.71 -10,227.75 6018,932.07 496,065.61 31.92 1,304.19 MWD (4) 13,236.02 88.52 170.25 6,251.44 6,183.44 2.304.42 -10,224.31 6,018,901.79 496,069.07 22.80 1,331.47 MWD (4) 13,268.37 88.95 173.75 6252.16 6,186.16 2,272.40 -10,219.81 6,018.869.77 496,073.59 10.90 1,360.03 MWD (4) 13,297.03 88.43 176.07 6,252.81 6,184.81 2,243.86 -10,217.27 6,018,891.24 496.076.16 8.29 1,385.97 MW0 (4) 13,326.02 87.79 179.19 6,253.77 6,185.77 2,214.91 -10,216.07 6,018,812.30 496,077.38 10.98 1,412.76 MWD (4) 13,355.65 86.43 182.28 6,255.26 6,187.26 2,185.33 -10,216.45 6,018,782.72 496,077.03 11.38 1,440.69 MWD(4) ! 13,385.39 86.87 186.03 6,257.00 6,189.00 2,155.72 -10,218.60 6,018,753.11 496,074.90 12.67 1,469.25 MWD (4) 13,415.77 88.90 186.29 6,258.12 6,190.12 2,125.54 -10.221.83 6,018,722.93 496,071.67 6.74 1,498.73 MWD (4) 13.446.14 89.54 182.56 6,258.54 6.190.54 2,095.27 -10,224.20 6,018.692.66 496,069.35 12.46 1,527.97 MWD (4) 13,475.49 90.15 161.08 6,258.62 6,190.62 2,065.93 -10225.13 6,018,663.33 496,068.45 5.45 1,555.86 MAD (4) 13,505.42 90.15 179.49 6,258.54 6,190.54 2,036.01 -10,225.28 6,018,633.40 496,068.32 5.31 1,584.03 MWD (4) I 13,535.55 91.29 176.95 6,258.16 6,190.16 2,005.90 -10,224.35 6.018,603.30 496069.28 9.24 1.612.01 MWD (4) 13,565.57 93.45 175.31 6,256.92 6,188.92 1,975.97 -10,222.32 6,018,573.38 496,071.33 9.03 7,639.43 MWD (4) 13,596.38 93.72 171.56 6,254.99 6,186.99 1,945.43 -10,218.81 6,018,542.84 496,074.87 12.18 1,666.93 MWD (4) 13,627.38 94.37 170.50 6,252.80 6,189.80 1914.89 -10,213.99 6,018,512.31 496,079.72 4.00 1,693.98 MND (4) 13,655.38 93.35 173.64 6,250.92 6,182.92 1867.22 -10,210.13 6018,48465 496,06360 1177 1.71866 MWD (4) 10/672017 428r54PM Page 3 SA (ER �UGRLS Annotation TIP KOP COMPASS 5000.14 Build 85 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3M-27 Project: Kuparuk River Unit ND Reference: 3M-27 @ 68.00usft (3M-27) Site: Kupamk 3M Pad MD Reference: 3M-27 @ 68.00usft (3M-27) Well: 3M-27 North Reference: True Wellbore: 3M-27 Survey Calculation Method: Minimum Curvature Design: 3M-27 Database: EDT Alaska Sandbox Survey 10/62017 4: 28.54PM Page 4 COMPASS 5000.14 Build 85 ffiap Map Vertical MD Inc Azi TVD NDSS (N/S +E/ -W Northing Fasting DLS Section Survey Tool Name Annotation (usft) (`) (°) (usft) (usR) (usR) (usR) (ft) (R) (°71000 IRI 13685.26 94.15 174.32 6,248.96 6,180.96 1,857.57 -10,207.01 6.018,455.00 49,08675 3.51 1,745.46 MWD(4) 13,716.03 93.75 177.29 6,246.84 6,178.84 1,826.96 -10,204.76 6,018,424.39 496,089.02 9.72 1,773.45 MWD (4) 13,745.75 90.89 177.32 6,245.64 6,177.64 1,797.30 -10,203.36 6,018,394.74 496,090.44 9.62 1800.85 MWD(4) 13,775.25 89.32 178.07 6,245.59 6,177.59 1,767.82 -10,202.18 6,018,365.27 496,091.65 5.90 1,828.14 MWD (4) 13,805.61 88.65 180.01 6,246.13 6,178.13 1,737.47 -10,201.67 6.018,334.92 496,092.19 6.76 1,856.48 MWD (4) 13,835.33 89.57 184.53 6,246.59 6,178.59 1,707.79 -10,202.85 6,018,305.24 496,091.03 15.52 1,884.78 MWD(4) 13,865.64 90.92 185.95 6,246.46 6,178.46 1,677.71 -10,205.61 6,018,275.16 496,088.30 6.49 1.913.99 MWD (4) 13,895.53 91.10 189.41 6,245.93 6,177.93 1,648.00 -10,209.61 6,018,245.44 496,084.32 11.55 1,943.28 MWD (4) 13,924.97 91.72 192.09 6,245.20 6,177.20 1,619.08 -10,215.10 6,018,216.53 49,078.86 9.34 1,972.33 MWD (4) 13.955.61 90.71 196.42 6,244.55 6,176.55 1,589.40 -10,222.64 6,018,186.85 49,07134 14.51 2,002.80 MWD (4) 13,985.57 87.73 1%.08 6,244.96 6,176.96 1,560.64 -10,231.02 6,018,158.08 49,062.98 10.01 2,032.69 MWD (4) 14,015.53 88.25 200.17 6,246.01 6,178.01 1,532.19 -10,240.34 6,018,129.63 496,053.70 13.75 2,062.61 MWD (4) 14,045.25 88.74 202.81 6,246.79 6,178.79 1,504.55 -10,251.22 6,018,101.98 496,042.84 9.03 2,092.31 MWD (4) 14,077.86 86.% 205.95 6,247.45 6,179.45 1,474.84 -10,264.68 6,018,072.26 496,029.40 9.69 2,124.63 MWD (4) 14,105.39 89.26 207.48 6,247.88 6,179.88 1,450.27 -10,277.05 6,018,047.68 496,017.03 5.67 2,152.15 MM (4) 14,135.09 89.54 210.71 6,248.19 6,180.19 1,424.32 -10,291.49 6,018,021.73 496,00264 10.92 2,181.47 MM (4) 14,165.33 90.64 214.45 6,248.14 6,180.14 1,398.85 -10,307.77 6,017,996.24 495,986.38 12.89 2.210.98 MWD (4) 14,195.30 92.18 217.65 6,247.40 6,179.40 1,376.63 -10,325.40 6,017,972.01 495,968.78 11.85 2,239.77 MWD (4) 14,225.38 93.28 219.67 6,245.97 6,177.97 1,351.17 -10,344.17 6,017,948.53 495950.03 7.64 2,268.23 MM (4) 14,255.13 94.92 222.23 6,243.84 6,175.84 1.328.76 -10,363.61 6,017,926.11 495,930.61 10.20 2,295.94 MWO(4) - 14,285.12 93.41 223.15 6,241.66 6,173.66 1,306.77 -10,383.89 6,017.904.11 495,910.35 5.89 2,323.53 MWD (4) 14,315.07 93.75 225.58 6,239.79 6,171.79 1,285.41 -10,404.79 6,017,882.73 495,869.47 8.18 2.350.76 MWO(4) 14,345.20 93.94 228.38 6,237.77 6,169.77 1,264.90 -10,426.77 6.017,862.20 495,861.51 9.29 2,377.55 MWD (4) 14,375.37 94.46 23150 6,235.56 6,167.56 1,245.54 -10,449.79 6,017,842.62 495,844.50 10.46 2,403.62 MM (4) 14,427.00 94.6 231.50 6,231.55 6,163.55 1,213.49 -10,490.08 6,017,810.75 495,809.25 0.00 2,447.51 PROJECTED to TD 10/62017 4: 28.54PM Page 4 COMPASS 5000.14 Build 85 THE STATE °fALASKA GOVERNOR BILL WALKER J. Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O. Box 100360 Anchorage, AK 99510-0360 Alaska Gil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3M-27AL3 ConocoPhillips Alaska, Inc. Permit to Drill Number: 217-057 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Surface Location: 892' FNL, 1574' FEL, Sec. 25, T13N, R8E, UM Bottomhole Location: 4902' FNL, 1582' FEL, Sec. 22, T13N, R8E, UM Dear Mr. Ohlinger: Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 217-053, API No. 50-029- 22637-01-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this _day of April, 2017. STATE OF ALASKA AL, .A OIL AND GAS CONSERVATION COMB/@` _)N PERMIT TO DRILL 20 AAC 25.005 'IIwG1VCV APR 11 2011 AOGCC 1 a. Type of Work: 11b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill ❑ Lateral - ❑� Stratigraphic Test ❑ Development - Oil D • Service - Wini ❑ Single Zone ❑� - Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q . Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180 • KRU 3M-27AL3 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 14375' TVD: 6231" Kuparuk River Pool / Kuparuk River Oil Pool. 4a. Location of Well (Governmental Section): Surface: 892' FNL, 1574' FEL, Sec 25, Tl 3N, RBE, UM 7. Property Designation (Lease Number): ADL 355032 5) Top of Productive Horizon: 8. Land Use Pe it: 13. Approximate Spud Date: 3617' FNL, 986' FEL, Sec 22, T13N, R8E, UM ALK 3576 4/24/2017 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 4902' FNL, 1582' FEL, Sec 22, T1 3N, R8E, UM 549& 3700' 41b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 68' 15. Distance to Nearest Well Open Surface: x- 506294 y- 6016606 Zone- 4 GL Elevation above MSL (ft): 27' to Same Pool: 1508', 3M-23 16. Deviated wells: Kickoff depth: 12825 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 97 degrees • Downhole: 4305 Surface: 3684 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 1600' 12775' 6254' 14375' 6231' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 13016' 6440' N/A 12926' 6372' 12907' Casing Length Size Cement Volume MD TVD Conductor 121' 16" 200 CF 121' 121' Surface 5928' 9-5/8" 1300 sx AS III, 690 sx Class G 5996' 3465' Production 12938' T' 200 sx Class G 13006' 6432' Perforation Depth MD MY 12696'- 12708', 12724' - 12744', Perforation Depth TVD (ft): 6198'- 6207', 62191- 6234', 12764'- 12784' 6249'- 6264' 20. Attachments: Property Plat ❑ BOP Sketch ❑ Drilling Program Q Time v. Depth Plot ❑ Shallow Hazard Analysis ❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program Q 20 AAC 25.050 require nts ❑✓ 21. Verbal Approval: Commission Representative: Date T/7 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not eith Herring @ 263-4321 be deviated from without prior written approval. Contact Email Keith. E. Herrin0(rDCOD.COr11 Printed Name J. Ohlinger Title Staff CTD Engineer Signature Phone 265-1102 Date Commission Use Only Permit to DrillAPI Number: 97 I -� Number: rr��p !!\\ 50-�C) -� Permit Approval Date: Z{_�L,�j.(-( See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: ,/ Other: BLIP flsf -47-0010 a a q Samples req'd: Yes ❑ N,[ Mud log req'd: YesEJNIW( V �t * H,S,mm�eeaas ret: Yes [f Nom❑l Directional svy req'd: Yes [j No ❑ /1-0" f/iGi r�P�-t ✓,{tvl 'tL�✓d7�n'S,. �JY S cing6eBxceUP`i6n re ' Yes IJ ❑ T req'd: Yes No A Yu r/anCc / v .2egA Ie zs Q ! ❑ No Inclination -only injection s(� Post initial injection MIT req'd: Yes ❑ NoET IS�jI'Gcs7ttC/ �o a6lor.✓ /G72= kic,�o Poirrl-d-o ii�any J7v%nt�clon 7`hc �Ottrtvt�' �at<ra. 1. APPROVED BY �r Approved COMMISSIONER THE COMMISSION Date: /r Submit Form and Form 10-401 (Revised 11/2015) a t a d r months from the date of approval (20 AAC 25.005(8)) Attachments in Duplicate '0gviyi, OfG�N ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 April 7, 2017 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: RECEIVE® APR 11 2017 AOGCC ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill eight laterals out of the KRU 3M-27 (PTD# 195-214) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin in May 2017. The objective will be to drill the 8 laterals KRU 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M-27AL4, 3M-27AL4-01, and 3M-27AL4-02 targeting the Kuparuk A and C -sands. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: — Permit to Drill Application Forms (10-401) for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 — Detailed Summary of Operations — Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 — Current wellbore schematic — Proposed CTD schematic The application for sundry approval (10-403) for 3M-27 was approved on 3/16/2017. If you have any questions or require additional information, please contact me at 907-263-4321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b)).......................................................................--........................................2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2)). ................................................................................................................................................. 2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4)).................................................. ....................... ...................................................... .................. 2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................3 7. Diverter System Information..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8))..................................................................................................................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis...........:.................................................................................................................4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................7 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 7 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 7 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b)) ....... -............................................................................................................................................. 7 16. Attachments....................................................................................................................................8 Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02......................................8 Attachment 2: Current Well Schematic for 3M-27...........................................................................................................8 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02........................8 Page 1 of 8 April 7, 2016 PTD.,pplication: 3M -27A, AL1, AL2, AI -4-01, AL3, AL4, AI -4-01, AI -4-02 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M- 27AL3, 3M-27AL4, 3M-27AL4-01, & 3M-27AL4-02. All laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A and C sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 3M -27A, 3M-27AL1, 3M-27AL2, 3M-27AL2-01, 3M-27AL3, 3M- 27AL4, 3M-27AL4-01, & 3M-27AL4-02. 3. Blowout Prevention Equipment Information (Requirements of 20 AA C 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. - Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,200 psi. Using the maximum formation pressure in the area of 4,305 psi in 3M-12 (i.e. 13.4 ppg EMW), the maximum potential surface pressure in 3M-27, assuming a gas gradient of 0.1 psi/ft, would be 3,684 psi ./ See the "Drilling Hazards Information and Reservoir Pressure" section for more details. - The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3M-27 was measured to be 3,591 psi (11.1 ppg EMW) on 9/5/2016. The maximum downhole pressure in the 3M-27 vicinity is to the southeast in the 3M-12 injector at 4,305 psi (13.4 ppg EMW) from August of 2016. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) None of the offset injection wells to 3M-27 have injected gas, so there is a low probability of encountering free gas while drilling the 3M-27 laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 3M-27 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 3M-27 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 8 April 7, 2016 PTD application: 3M -27A, AL1, AL2, All -i-01, AL3, AL4, AL4-01, AL4-02 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 31111-27A 13150' 15200' 6187' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 121' 1640 630 Surface aluminum billet on to 3M-27ALl 13100' 15200' 6190' 6105' 2-3/8", 4.7#, L-80, ST -L slotted liner; 3465' 5750 3090 Production 7" aluminum billet on to 3M-27AL2 14130' 16200' 6127' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; 7240 1 5410 Tubing 3-112" 9.3 aluminum billet on to 3M-27AL2-01 12825' 16200' 6203' 6077' 2-3/8", 4.7#, L-80, ST -L slotted liner; 1 10540 aluminum billet on to 3M-27AL3 12775' 14375' 6186' 6163' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4 12825' 15200' 6203' 6135' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-01 12875' 16200' 6204' 6062' 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3M-27AL4-02 12583' 14375' 6046' 6167' 2-3/8", 4.7#, L-80, ST -L slotted liner; u into 3-1/2" tubing Existing Casingkiner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded 0' 121' 0' 121' 1640 630 Surface 9-518" 40.0 L-80 BTC 0' 5996' 0' 3465' 5750 3090 Production 7" 26.0 L-80 BTC -MOD 0' 13006' 0' 6432' 7240 1 5410 Tubing 3-112" 9.3 L-80 EUE 0' 12598' 0' 6125' 10160 1 10540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System Window milling operations: Chloride -based FloVis mud (8.6 ppg) Drilling operations: Chloride -based RoVis mud (8.6 ppg) This mud weight will not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and wellbore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled Page 3 of 8 April 7, 2016 f PTD application: 3M -27A, AL1, AL2, AU -01, AL3, AL4, AL4-01, AL4-02 tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 'Blowout Prevention Equipment Information In the 3M-27 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 31VI-27 Window (12725' MD, 6220' TVD) Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 Pumps On 1.5 bpm) Pumps Off A/C -sand Formation Pressure 11.1 3591 psi 3591 psi Mud Hydrostatic 8.6 2782 psi 2782 psi Annular friction i.e. ECD, 0.08psi/ft) 1018 psi 0 psi Mud + ECD Combined no chokepressure) 3800 psi overbalanced -209psi) 2782 psi underbalanced -809psi) Target BHP at Window 11.8 3817 psi 3817 psi Choke Pressure Required to Maintain Target BHP 17 psi 1035 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3M-27 is a Kuparuk A -sand and C -sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize eight laterals to target the A and C sands to the north, west, and south of the 3M-27 parent wellbore. The laterals will add new resources and improve existing recovery. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail and the D nipple at 12588' MD will be milled out to a 2.80" ID. The existing A -sand and C -sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze Nabors CDR3-AC will mill a pilot hole to 12755' MD and set a mechanical whipstock in the 2.80" pilot hole to kick off at 12725' MD. A window will be milled in the 7" casing at 12725' MD to drill and complete the 3M-27 laterals. Page 4 of 8 April 7, 2016 PTD Application: 3M -27A, AL1, AL2, ALi-01, AL3, AL4, AL4-01, AL4-02 The 3M -27A sidetrack will exit the cement pilot hole at 12725' MD and TD at 15200' MD, targeting the Al sand to the north. It will be completed with 2-3/8" slotted liner from TD up to 13150'MD with an aluminum billet for kicking off the 3M-27AL1 lateral. The 3M-27AL1 lateral will drill to the north to a TD of 15200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 13100' MD with an aluminum billet for kicking off the 3M-27AL2 lateral. The 3M-27AL2 lateral will drill to the west to a TD of 16200' MD targeting the C4 sand. It will be completed with 2-3/8" slotted liner from TD up to 14130' MD with an aluminum billet for kicking off the 3M-27AL2-01 lateral. The 3M-27AL2-01 lateral will drill to the west to a TD of 16200' MD targeting the A 1 sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL3 lateral. The 3M-27AL3 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12775' MD with an aluminum billet for kicking off the 3M-27AL4 lateral. The 3M-27AL4 lateral will drill to the north to a TD of 15200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12825' MD with an aluminum billet for kicking off the 3M-27AL4-01 lateral. The 3M-27AL4-01 lateral will drill to the west to a TD of 16200' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12875' MD with an aluminum billet for kicking off the 3M-27AL4-02 lateral. The 3M-27AL4-02 lateral will drill to the south to a TD of 14375' MD targeting the Al sand. It will be completed with 2-3/8" slotted liner from TD up to 12583' MD. Pre -CTD Work 1. RU Slickline: Obtain SBBP, dummy off gas lift mandrels, and pressure test. 2. RU E -line: Punch 2' of holes in the 3-1/2" tubing tail at 12583' MD. 3. RU Pumping Unit: Perform injectivity test down the tubing. 4. RU Service Coil: Mill out "D" nipple and cement squeeze the A/C -sand perforations up to the holes in the tubing tail. 5. RU Slickline: Tag top of cement and pressure test cement. 6. Prep site for Nabors CDR3-AC rig and set BPV. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 3M -27A Sidetrack (Al sand - north) a. Mill 2.80" high -side pilot hole through the cement to 12755' MD. b. Caliper pilot hole. c. Set top of whipstock at 12725' MD. d. Mill 2.80" window at 12725' MD. e. Drill 3" bi-center lateral to TD of 15200' MD. f. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13150' MD. Page 5 of 8 April 7, 2016 PTD ,Application: 3M -27A, AL1, AL2, AL, -01, AL3, AL4, Al -4-01, AL4-02 3. 3M-27AL1 Lateral (C4 sand - north) a. Kickoff of the aluminum billet at 13150' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 13100' MD. 4. 3M-27AL2 Lateral (C4 sand - west) a. Kickoff of the aluminum billet at 13 100'MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 14130' MD. 5. 3M-27AL2-01 Lateral (Al sand -west) a. Kickoff of the aluminum billet at 14130' MD. b. Drill 3" bi-center lateral to TD of 16200' NM. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 6. 3M-27AL3 Lateral (Al sand - south) a. Kick off of the aluminum billet at 12825' No. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12775' MD. 7. 3M-27AL4 Lateral (Al sand -north) a. Kick off of the aluminum billet at 12775' MD. b. Drill 3" bi-center lateral to TD of 15200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12825' MD. 8. 3M-27AL4-01 Lateral (Al sand -west) a. Kick off of the aluminum billet at 12825' MD. b. Drill 3" bi-center lateral to TD of 16200' MD. c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 12875' MD. 9. 3M-27AL4-02 Lateral (Al sand- south) a. Kickoff of the aluminum billet at 12875' MD. b. Drill 3" bi-center lateral to TD of 14375' MD. c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 12583' MD. 10. Freeze protect, set BPV, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Pull BPV. 2. Obtain SBHP. 3. Install gas lift design. 4. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. Page 6 of 8 April 7, 2016 PTD r%pplication: 3M -27A, AL1, AL2, AU,01, AL3, AL4, AI -4-01, AI -4-02 - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running - The 3M-27 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-318" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 3M -27A 2900' 3M-27AL1 2900' 3M-27AL2 900' 3M-27AL2-01 900' 3M-27AL3 3700' 3M-27AL4 2900' 3M-27AL4-01 900' 3M-27AL4-02 3700' - Distance to Nearest Well within Pool Lateral Name Distance Well 3M -27A 2270' 3M-25 3M-27AL1 2270' 3M-25 Page 7 of 8 April 7, 2016 r PTD application: 3M -27A, AL1, AL2, AU,. -01, AL3, AL4, AL4-01, AL4-02 3M-27AL2 5065' 3M-25 3M-27AL2-01 5065' 3M-25 3M-27AL3 1508' 3M-23 3M-27AL4 2270' 3M-25 3M-27AL4-01 5065' 3M-25 3M-27AL4-02 1508' 3M-23 16. Attachments Attachment 1: Directional Plans for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Attachment 2: Current Well Schematic for 3M-27 Attachment 3: Proposed Well Schematic for 3M -27A, AL1, AL2, AL2 -01, AL3, AL4, AL4-01, & AL4-02 laterals Page 8 of 8 April 7, 2016 ConocoPhillips Project: Nupatuk Rlver Unit Site: Kuparuk 3M Pad abnum. I11x.�u=xmn fte.' : msa weKto l„a WELLBORE DETAILS: 3M -27A REFERENCE INFORMATION parent Welepre: 3M-27 C.Idae.e (NIE) We.., Weld JM -n, Tme NOM Wall 3M-27 aaeoan. 57t.xmn Tie on MD: 12682.46 Vc.I ISWI RNaenm'. 3M,27 ® aBAoiW CW27) Wellbore: 3M -27A W nnam m.m• 5e�l;gi Ws7 Relexrca' W (o.wN, OmE) Plan: 3M -27A wp61 (31611-27131111(31611-27131111Mm.l: pM..7ltrq,7 eaoMmle Meesure0 oeeul wlueras JM37�680awttIJM21) cakwaf.n Met W: A9rdmam arvaWro nsol M 6500 M �71M. IAL] nM] {I �—'3111/M ]A. I 1h1 InM ] 1.1i ]M 2l M ]M1I I 5850 1 tsv tOm _ \1 Il/ Uf-I9 /i IIL 6 h _ J— )nl Itl/tM IM t 5200 ! —{ JJ — .I y,2 110 e) I F --- . b AM I2 WIIM IMI 0 El 32501 .. 3M..13lTV-IS _ASO ;M nl.v v o A 2600 ^`� \_ O iM4 NJM-M1 10NtN.Io.--- v1300 _ lh . :A1 :0 S 1M to lt1 A 6 �.'. c o p 650 � A • i llA{M/iM I( O _650 _.��— a , ' `8 .LI IOOMI _� _' -I300�.. -1950 s g I1,MMM. J9hN/lMe-2}N1L11P9POPt 1I. -3600 PbM.IMI. bn c' nl1] 0 ` e0N/ WJ4]b 5 w -1250 -- -� k fi _ fin p. • 0 _VA-O>'1M.o_ iM� I!)Myl ._._ M24 124LI IPBI - v” rv�u 111 -I81 L,iM."I IR / -3900 41"_ 4550 --� ]M A/3M �LI4 2 1M 24iM2b �•. Gg' .U21ItM-:I H_ f00 i1 M 3 — �� ._ -5200 JM -2F11 �'ep ,Ib:'01,1: ') 4'0� tll 6500 15 13 7nTl -7150 5 3M-2] @ 613.6 .9 50-13 00 0-1 2 3 5 0-11]00-11050-.0400 -9]50 Af 00 -8450 -]800 -0150 -6500 -5850 -5200 -4550 -3900 -3250 -2600 -1950 -130D -650 0 650 ❑00 1950 2600 3250 3900 4550 5200 5850 6500 7150 7800 9M 1/ West( -)/East(+) (650 usft/in) rias BAKER KUP PROD 3M-27 COIIOCOiaAlOhpS 3 MaxAngle&MD iD WenbCooAributes AlaSka,lnc. weveem Avlmwl Fieltl Neme WBllborefialus ncl ('1 MGIflNBI ACIBM (flN31 50029063700 KUPARUKRIVERUNB PROD ]2.19 3.M.90 13,0060 Comment Hos (ppm) Ogle AnnoWion EnoON NBL,tl (16 Ng --- 0x10 Aulke' mdom6:UnPM SSSV: NWPLE 220 101232015 Pension 3/17120118 111W1996 Mnelallen OapN lttNal Ena Dab MnolWan fut Notl By ......_,.___.__..._...__.._..._..._.. ..._......... Last Tag: ELM 12,86]0 922016 Ie. Rev Reeson:H250TAG ppmven 9162016 asng rings ' Ca¢InA crou. 90(in)fO gnl Top((IKS) Sel Oep1l drKe) Sel Oepte (NnL.. WNLen ll.. GnEe Tnp Tnwa CONDUCTOR 16 15.1162 42.0 1210 1219 fi256 H-40 WELDED 1 ( Cazing Oe¢niPllon OD(inl ID lint TaP IKKO) SeI DePtn IttN01 Set pepN (rVD).. WIILen IL.. Cmaa TBP ones SURFACE 9518 8835 41.0 5,995.9 3.465.3 4000 LA0 BTC Ca¢ing OeSWptlon OO lin) IO6n) Tep lfl%O) Sel neple l.Naf 581 pepih (iVD1... Wnlan(I...Gnae Tap -1 PRODUCTION > rr6 385 13,0060 6432.3 28.011 LA0 BTC -MOD Tubing Strings CONDUCTOR 42.0-a1.0 mhmP Ceac;mnnn Smng Ma_m(Inl TnP(nNe) sel0evm n_sot 0nv01(NO)(... wlpexp G,aae Tepeonneetmn TUBING 3112 2992 9.9 12,5395 6,9622 9.30 L-60 EUEB1dABMOO Completion Details NommalIn Top(--) Top(NO)(.) Tupma(') vein Des coin (In1 9.8 99 002 HANGER FMC GEN IV TUBING HANGER 3500 Guo uFr; 3.Y3J 495.1 494.7 6.65 NIPPLE CAMCO DS LANDING NIPPLE 2.875 12,433.1 6,0052 45.12 SLEEVE BAKERCMU SLIDING SLEEVE 2.812 12,482.6 6,040.5 43.55 SEALABSV BD40 SEALS LCCATOR4TSPACE OUT 2AW 12,484.8 6,042.2 43.40 PER BAKER 0640 PER 4.000 12,498.2 6,051.9 43.05 Packer BAKER FHL PACKER 2.900 SURFACE41,0 s.335s 12,515.1 0064.3 42.70 NIPPLE X NIPPLE 2.813 8,532.6 6,077.2 4259 OVERSHOT BAKER PO -BOY OVERSHOTw16.09 SWALLOW 3.625 GAa Uk Tfl913.1 inhlnP @snipven Stang M. lnlinl inp lRNa) sol oePlh dt set Devt6(ND) (... wl pan) Greae TOP Connoclian TUBING -Original 31/2 2.992 1$5335 12,59>.9 8,1254 9.30 L-60 ABM EUE Completion Details ominal lO Tap (.Eh Top (NO)(tIKB) Top Incl (') INm Oes Co. (m) cAs uFT:9Afi1A 125495 6,0999 4249 1 NIPPLE CAMCOWNIPPLE 2812 12557.5 6.095.5 42.44 PBR KER BAPBW) 10' STROKE 3.000 12,5705 6.1052 4236 PACKER BAKER FHL PACKER 3000 13,5879 M1B.0 I 4228 NIPPLE CAMCO O NIPPLE 275D GPS LIFT; 11A.e3 4,597,2 6,124.8 42.29 1 SOSML BAKERSHEAROUTSUB 3.015 Other in Hole (Wiregne retrlevable plugs, valves, pumps, fish, etc.) Top (ND) Topmel Top BK3) "K3) 1') 0ez Com Run Dale loon) GAS UM MA7ai 12,727g 6,221.9 4120 Fish 1 112" OV on RK Dropped Downhole 1226/1997 12/2611997 12,8640 6,3252 4094 Fsh 1-GLVon BKLoatdownhole621996 621996 12,911.0 6,360.7 41.07 Fish JUNK Milled up prematurely set packer83IM' 5141998 Tailpipe assembly, Pushed JUNK to bottom on 5296 SLEEVE; 12,433.1 Perforations & Slots pone oem Top a (show (nKe) Sem deanInns)KO) M(nKe)e) mna 0m 0 type sem sEAt Asst: 121o28 12,696.0 12.708.0 5.195.6 6,207.6 Cd, 3M27 9162008 6.0 APERF 2.5' PJ 4W 2506, 00 MR. 1?41Bs deg PHASE F.Wr, Ra6es 12,724.0 12744.0 8,219.7 5,234.7 C4,3M27 5112/1996 4.01PERF 180 deg. phasing; 90 deg F/ IowtlLe of hole; 21M' Eneclet 12,764A 12)84.0 6,249.8 6,264.9 M. 31A-27 7/201999 4.0 APERF 100 deg plusifg;(+/_) NIPPLE; 12515.1 90 deg VlowBide Of hole; 2.5"HSD Mandrel Inserts at ni on X Top grKS) TMOO Make 00 Iry Valve TypeUch Po(in) TRO Run pn Type T (in) (Poll OR IWnwn Co. 1 3,543.1 2,599.4 CAMC0 1 GAS LIFT GLV BK 0.125 1,338.0 4Ra2DDB 2 fi,918.1 3,801.5 DAMDD 1 GAS LIFT GLV BK 015fi 1,367.0 4/6)20083 j 9,761.8 4,800.1 CAMCO 1 GAS LIFT GLV BK 0.188 14/812008II.dro.8 5,5467 CAMCO 1 GAB LIFT GLV BK 0.1881 4161200812,3781 5,9689 CAMCO 1 GAS LIFT OV BK 0.250 0.0 41512008 Notes General & Safety End Dale I AnnoWon 5/252005 NOTE:3' sleeve patch installed Over SURF CSGetemal comeou0'A' 1112 9 /20 1 0 NOTE:VimsmemwieWAlaska SchematiO.0 APFAF; 12,6060-12,1N. F¢1412]21A IFERF; 1;724A -12.244A---- APERF;IZ754O12.TYA- Flak l o"o FI¢I{ 12.811.0 PRODUCTION; 33S1Jp060 3M-27 Proposed CTD Schematic 121' MD 9-5/8" 36# L-80 shoe @ 5996' MD C -sand parts 12,696' - 12,708' MD 12,724' - 12,744' MD IKOP 90 12,725' MD I IA -sand perfs 12,7641- 12,784P MD F7"-26# L-80 shoe @ 13,006' MD 3-1/2" Cameo DS Landing Nipple @ 495' MD (ID = 2.875") 3-1/2" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Cameo MMG gas lift mandrel @ 3543', 6918', 9762', 11,666'.12,378- Baker 1,666',12,378'Baker CMU Sliding Sleeve @ 12,433' (2.813" ID X -profile) Baker 80-40 PBR @ 12,485' MD (4.00" ID) Baker FHL packer @ 12,498' MO (2.90" ID) X Nipple @ 12,515' MD (2.813" ID) Baker Po -Boy Overshot @ 12,533' MD Cameo W Nipple @ 12,550' MD (2.812" ID) Baker PBR @ 12,558' MD (3.00" ID) Baker FHL packer @ 12,571' MD (3.0" ID) 3-1/2" Cameo D nipple @ 12,588' MD (ID = 2.75") (Milled out to 2.80" ID for CTD) 3-1/2" tubing tail @ 12,597' MD 3W27AL3 wp02 iwulh) TO ®14,375' MD Liner Blllel 12,775' MD 3M-27AL4-01 wp00 (wast) TD @ 16,200' MD Liner Billet @ 12,876 MD 3 VI 27AL4-02 wp00 (south) T0? 14,375' MD LinerT 12,583'Me 3M-27AL201 wp01 (wes) TD 16,200' 2. Lima BiOet 12,825 MO 3M-27A6,2MD eag TO 18,200'00, MD Liner Billet Q 14130' MD TD @ 15,200' MD Liner Billet13,100' MD 3M -27A wp01 (north) TD C 15,200' MD Liner Billet @ 13, 150 MD ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3M Pad 3M-27 3M-27AL3 Plan: 3M-27AL3_wp02 Standard Planning Report 03 April, 2017 rias BAKER HUGHES ConocoPhillips Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27AL3 Design: 3M-27AL3_wp02 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: r Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor AN BAKER HUGHES Site Kuparuk 3M Pad 3M-27 +N/ -S +E( -W 0.00 usft Northing: 0.00 usft Easting: 0.00 usft Wellhead Elevation: Site Position: Northing: 6,016,202.17 usft Latitude: 70° 27' 19.780 N From: Map Easting: 506,126.99 usft Longitude: 149° 56'59.998 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: 0.05 ° Well Well Position Position Uncertainty 3M-27 +N/ -S +E( -W 0.00 usft Northing: 0.00 usft Easting: 0.00 usft Wellhead Elevation: 6,016,606.24 usft 506,294.30 usft usft Latitude: Longitude: Ground Level: Measured Wellbore 3M-27AL3 Dogleg Build Magnetics Model Name Sample Date Declination (°I Dip Angle (0) System BGGM2016 7/1/2017 _ 17 53 81 00 Design 3M-27AL3_Wp02 (usft) (°) (°) (usft) Audit Notes: (usft) (°1100ft) (°I100ft) (°1100ft) (°) Target Version: 80.95 Phase: PLAN 6,202.80 Tie On Depth: 12,82! Vertical Section: 000 Depth From (TVD) -NAS +E/ -W Direction 253.79 6,204.00 (usft) (usft) (usft) (°) -38.76 300.00 0.00 0.00 0.00 200.00 70° 27' 23.753 N 149° 56'55.073 W 0.1 usft Field Strength (nT) 57,543 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/ -S +EbW Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°1100ft) (°I100ft) (°1100ft) (°) Target 12,825.00 80.95 280.92 6,202.80 2,562.10 -9,972.76 0.00 000 0.00 0.00 12,895.00 97.12 253.79 6,204.00 2,558.87 -10,041.80 45.00 23.09 -38.76 300.00 13,035.00 93.22 190.61 6,189.94 2,460.69 -10,130.49 45.00 -2.78 -45.13 270.00 13,185.00 92.08 180.16 6,182.98 2,311.72 -10,144.53 7.00 -0.76 -6.97 264.00 13,320.00 89.62 171.04 6,180.98 2,177.28 -10,134.18 7.00 -1.82 -6.76 255.00 13,520.00 88.18 184.97 6,184.85 1,977.94 -10,127.22 7.00 -0.72 6.96 96.00 13,745.00 90.14 200.60 6,168.16 1,759.23 -10,176.84 7.00 0.87 6.95 83.00 14,200.00 93.28 232.31 6,174.20 1,398.06 -10,443.50 7.00 0.69 6.97 84.00 14,375.00 94.27 220.07 6,162.64 1,277.41 -10,569.28 7.00 0.56 -6.99 275.00 4/32017 2:58:53PM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips nos ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Local Co-ordinate Reference: Well 3M-27 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kupamk River Unit MD Reference: 3M-27 @ 68.00usft (3M-27) Site: Kuparuk 3M Pad North Reference: True Well: 3M-27 Survey Calculation Method: Minimum Curvature Wellbore: 3M-27AL3 Map Map Design: 3M-27AL3_wp02 System +N/ -S Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/ -S +E/ -W Section Rate Azimuth Northing Easting (usft) (') (`) (usft) (usft) (usft) (usft) (-1100ft) (') (usft) (usft) 12,825.00 80.95 280.92 6,202.80 2,562.10 -9,972.76 1,003.30 0.00 0.00 6,019,159.65 496,320.38 TIP/KOP 12,895.00 97.12 253.79 6,204.00 2,558.87 -10,041.80 1,029.95 45.00 -60.00 6,019,156.37 496,251.35 Start 45 dls 12,900.00 97.11 251.52 6,203.38 2,557.39 -10,046.53 1,032.96 45.00 -90.00 6,019,154.88 496,246.62 13,000.00 94.82 206.32 6,192.41 2,493.70 -10,119.47 1,117.75 45.00 -90.28 6,019,091.14 496,173.74 13,035.00 93.22 190.61 6,189.94 2,460.69 -10,130.49 1,152.54 45.00 -95.24 6,019,058.12 496,162.75 End 46 dls, Start 7 dis 13,100.00 92.74 186.08 6,186.56 2,396.48 -10,139.91 1,216.10 7.00 -96.00 6,018,993.91 496,153.39 13,185.00 92.08 180.16 6,182.98 2,311.72 -10,144.53 1,297.33 7.00 -96.24 6,018,909.15 496,148.84 4 13,200.00 91.81 179.15 6,182.48 2,296.73 -10,144.44 1,311.39 7.00 -105.00 6,018,894.17 496,148.94 13,300.00 89.98 172.39 6,180.91 2,197.07 -10,137.06 1,402.51 7.00 -105.03 6,018,794.53 496,156.40 13,320.00 89.62 171.04 6,180.98 2,177.28 -10,134.18 1,420.12 7.00 -105.14 6,018,774.74 496,159.30 5 13,400.00 89.03 176.61 6,181.92 2,097.78 -10,125.57 1,491.88 7.00 96.00 6,018,695.26 496,167.97 13,500.00 88.32 183.57 6,184.23 1,997.87 -10,125.73 1,585.82 7.00 95.93 6,018,595.36 496,167.90 13,520.00 88.18 184.97 6,184.85 1,977.94 -10,127.22 1,605.06 7.00 95.77 6,018,575.42 496,166.43 6 13,600.00 88.87 190.53 6,186.91 1,898.73 -10,137.99 1,683.18 7.00 83.00 6,018,496.21 496,155.72 13,700.00 89.75 197.47 6,188.12 1,801.76 -10,162.17 1,782.56 7.00 82.86 6,018,399.24 496,131.63 13,745.00 90.14 200.60 6,188.16 1,759.23 -10,176.84 1,827.55 7.00 82.77 6,018,356.70 496,117.00 7 13,800.00 90.54 204.42 6,187.83 1,708.43 -10,197.89 1,882.48 7.00 84.00 6,018,305.88 496,095.99 13,900.00 91.27 211.39 6,186.25 1,620.12 -10,244.66 1,981.46 7.00 84.02 6,018,217.55 496,049.30 14,000.00 91.97 218.36 6,183.42 1,536.16 -10,301.77 2,078.01 7.00 84.13 6,018,135.55 495,992.26 14,100.00 92.65 225.33 6,179.38 1,463.77 -10,368.38 2,170.70 7.00 84.33 6,018,061.11 495,925.72 14,200.00 93.28 232.31 6,174.20 1,398.06 -10,443.50 2,258.14 7.00 84.61 6,017,995.33 495,850.67 8 14,300.00 93.87 225.32 6,167.96 1,332.38 -10,518.56 2,345.54 7.00 -85.00 6,017,929.60 495,775.67 14,375.00 94.27 220.07 6,162.64 1,277.41 -10,569.28 2,414.53 7.00 -85.44 6,017,874.60 495,725.01 Planned TD at 14375.00 4/3/2017 2:58:53PM Page 3 COMPASS 5000.1 Build 74 ConocoPhillips IVAN ConocoPhillips Planning Report BAKER NYGMS Database: EDM Alaska NSK Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-27AL3 Design: 3M-27AL3_wP02 Targets Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method; Well 3M-27 Mean Sea Level 3M-27 @ 68.00usft (3M-27) Tme Minimum Curvature Target Name -hit/miss target Dip Angle Dip Dir. TVD +Nl-S +El -W Northing Easting -Shape V) V) (usft) (usft) (usft) (usft) (usft) 3M -27A Faultl 0.00 0.00 6,158.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 - plan misses target center by 1140368.01 usft at 12825.00usft MD (6202.80 TVD, 2562.10N,-9972.76 E) - Polygon Point 6,158.00 0.00 0.00 6,020,114.00 1,636,574.00 Point 6,158.00 1.00 1.00 6,020,115.00 1,636,575.00 3M-27AL3_Fault2 0.00 0.00 6,188.00 629.171,129,993.58 6,018,190.00 1,636,174.00 - plan misses target center by 1139967.98usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) MD (6202.80 - Polygon - Polygon 1,636,181.00 Point 6,18B.00 0.00 0.00 6,018,190.00 1,636,174.00 Point 6,188.00 1.00 1.00 6,018,191.00 1,636,175.00 3M-27AL3_Fault2_M 0.00 0.00 0.00 629.171,129,993.58 6,018,190.00 1,636,174.00 - plan misses target center by 1139984.86usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) 0.00 - Rectangle (sides W1,500.00 H1.00 D0.00) 1,991.47 6,018,709.11 1,636,352.18 Point 3M-27 CTD Polygon Sol 0.00 0.00 0.00 10.631,129,376.00 6,017,571.00 1,635,557.00 - plan misses target center by 1139368.50usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) 0.00 - Polygon -394.39 6,021,710.98 1,633,964.02 Point Point 0.00 0.00 0.00 6,017,571.00 1,635,557.00 Point 0.00 1,549.65 635.29 6,019,121.03 1,636,190.92 Point 0.00 1,306.29 1,066.14 6,018,878.06 1,636,621.93 Point 0.00 388.33 899.40 6,017,960.05 1,636,455.98 Points 0.00 -90.36 437.97 6,017,481.02 1,635,995.00 Point 0.00 0.00 0.00 6,017,571.00 1,635,557.00 3M-27 CTD Polygon We 0.00 0.00 0.00 4,589.101,128,180.75 6,022,148.00 1,634,358.00 - plan misses target center by 1138172.21 usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) - Polygon 1,636,181.00 Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 Point 0.00 0.00 0.00 6,022,148.00 1,634,358.00 Point 0.00 -2,757.14 2,351.05 6,019,393.12 1,636,711.14 Point 0.00 -3,440.92 1,991.47 6,018,709.11 1,636,352.18 Point 0.00 -2,499.35 1,383.16 6,019,650.07 1,635,743.13 Point 0.00 436.73 -394.39 6,021,710.98 1,633,964.02 Point 0.00 0.00 0.00 6,022,148.00 1,634,358.00 Latitude Longitude 70' 13'50.989 N 140' 47'43.316 W 70' 13'32.900 N 140' 48'3.201 W 70' 13'32,900 N 140' 48'3.201 W 70' 13'27.802 N 140° 48' 70' 14' 14.017 N 140' 48'37A99 W 3M-27AL3_Faulti 0.00 0.00 6,183.00 1,095.211,130,000.98 6,018,656.00 1,636,181.00 70' 13'37.414 N 140' 48'0,963 W - plan misses target center by 1139974.68usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) - Polygon Point 1 6,183.00 0.00 0.00 6,018,656.00 1,636,181.00 Point 6,183.00 1.00 1.00 6,018,657.00 1,636,182.00 3M-27AL3_T01 0.00 0.00 6,181.00 963.181,130,019.87 6,018,524.00 1,636,200.00 70' 13'36.104 N 140' 48'0.995 W - plan misses target center by 1139993.75usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) - Point 3M-27AL3_T03 0.00 0.00 6,162.00 67.461,129,577.07 6,017,628.00 1,635,758.00 70' 13'28.059 N 140' 48' 17.586 W - plan misses target center by 1139552.56usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) - Point 3M-27A_Faultl_M 0.00 0.00 0.00 2,553.021,130,395.25 6,020,114.00 1,636,574.00 70' 13'50.989 N 140' 47'43.316 W - plan misses target center by 1140384.88usft at 12825.00usft MD (6202.80 TVD., 2562.10 N, -9972.76 E) - Rectangle (sides W1,500.00 H1.00 D0.00) 3M-27 CTD Polygon Not 0.00 0.00 0.00 3,355.381,131,253.01 6,020,917.00 1,637,431.00 70' 13'57.516 N 140' 47' 15.219 W - plan misses target center by 1141242.91 usft at 12825.00usft MD (6202.80 TVD, 2562.10 N. -9972.76 E) - Polygon Point 0.00 0.00 0.00 6,020,917.00 1,637,431.00 Point 0.00 -2,146.46 -952.80 6,018,769.95 1,636,480.11 Point 0.00 -1,769.89 -1,622.57 6,019,145.92 1,635,810.09 Point 0.00 328.43 -503.79 6,021,244.97 1,636,926.98 Point 0.00 0.00 0.00 6,020,917.00 1,637,431.00 4/3/2017 2:58:53PM Page 4 COMPASS 5000.1 Build 74 ConocoPhillips Fara. ConocoPhillips Planning Report BAKER HUGHES Database: EDM Alaska NSK Sandbox Company: ConomPhillips(Alaska) Inc.-Kup2 Project: Kuparuk River Unit Site: Kuparuk 3M Pad Well: 3M-27 Wellbore: 3M-Z7AL3 Design: 3M-27AL3_wp02 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3M-27 Mean Sea Level 310-27 @ 66.00usft (3M-27) True Minimum Curvature 3M-27AL3 T02 0.00 0.00 6,188.00 564.22 1,129,922.52 6,018,125.00 1,636,103.00 70" 13'3Z374 N 140° 48'5.521 W - plan misses target center by 1139897.03usft at 12825.00usft MD (6202.80 TVD, 2562.10 N. -9972.76 E) - Point 3M-27AL3_FauR1 M 0.00 0.00 0.00 1,095.211,130,000.98 6,018,656.00 1,636,161.00 70° 13' 37.414 N 140'48'0.963 W - plan misses target center by 1139991.56usft at 12825.00usft MD (6202.80 TVD, 2562.10 N, -9972.76 E) -Rectangle (sides W1,500.00 H1.00 D0.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (uaft) Name (in) (in) 14,375.00 6,162.64 23/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 12,825.00 6,202.80 2,562.10 -9,972.76 TIP/KOP 12,895.00 6,204.00 2,558.87 -10,041.80 Start 45 dis 13,035.00 6,189.94 2,460.69 -10,130.49 End 45 dis, Start 7 dis 13,185.00 6,182.98 2,311.72 -10,144.53 4 13,320.00 6,180.98 2,177.28 -10,134.18 5 13,520.00 6,184.85 1,977.94 -10,127.22 6 13,745.00 6,188.16 1,759.23 -10,176.84 7 14,200.00 6,174.20 1,398.06 -10,443.50 8 14,375.00 6,162.64 1,277.41 -10,569.28 Planned TD at 14375.00 4/3/2017 2:58.53PM Page 5 COMPASS 5000.1 Build 74 Baker Hughes INTEQ FICH ConocoPhillips Travelling Cylinder Report BAKER HUGHES Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Reference Site: Kuparuk 3M Pad Site Error: 0.00 usft Reference Well: 3M-27 Well Error: 0.00 usft Reference Wellbore 3M-27AL3 Reference Design: 3M-27AL3_wp02 Local Co-ordinate Reference: TVD Reference: MO Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3M-27 3M-27 @ 68.00usft (3M-27) 3M-27 @ 68.00usft (3M-27) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference 3M-27AL3_wp02 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 12,825.00 to 14,375+00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,630.70 usft Error Surface: Elliptical Conic Survey Tool Program Date 3/30/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 265.00 12,692.45 3M-27 (3M-27) MWD MWD -Standard 12,692.45 12,825.00 3M-27A_wp01 (3M -27A) MWD MWD -Standard 12,825.00 14,375.00 3M-27AL3_wp02(3M-27AL3) MWD MWD -Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 14,375.00 6,230.64 2 3/8" 2-3/8 3 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Kuparuk 3M Pad 3M-09 - 3M-09 - 3M-09 Out of range 3M-10 - 3M-10 - 3M-10 Out of range 3M-11 -3M-11 -3M-11 Out of range 3M-12 - 3M-12 - 310-12 Out of range 3M-19 - 3M-19 - 3M-19 Out of range 314-23 - 3M-23 - 3M-23 Out of range 3M-24 - 3M-24 - 3M-24 Out of range 3M-24 - 314-241-1 - 310-241-1 Out of range 310-24-310-2411-01 -3M-2411-01 Out of range 314-24 - 310-2411-01 PB1 - 310-2411-01 PB1 Out of range 3M-24 - 3M-2411-02 - 3M-2411-02 Out of range 314-24 - 310-2411-03 - 3M-2411-03 Out of range 3M-24 - 3M -24L1 PB1 - 3M -24L1 PB1 Out of range 310-24 - 3M -24L1 PB2 - 3M -24L1 PB2 Out of range 3M-24 - 3M -24L7 P133 - 3M -24L7 PB3 Out of range 3M -27 -3M -27-3M-27 12,829.52 12,850.00 43.62 9.20 41.06 Pass - Major Risk 3M-27-3M-27A-3M-27A_wp01 12,825.00 12,825.00 0.00 0.57 -0.53 FAIL - Minor 1/10 3M-27-3M-27AL1-3M-27A11_wp01 12,825.00 12,825.00 0.00 0.57 -0.53 FAIL - Minor 1/10 3M-27-3M-27AL2-3M-27AL2_wp02 12,825.00 12,825.00 0.00 0.57 -0.53 FAIL - Minor 1/10 310-27-3M-27AL2-01-3M-27AL2-01_wp01 12,825.00 12,825.00 0.00 0.57 -0.53 FAIL - Minor 1/10 310-27-3M-27AL4-3M-27AL4_wp00 12,825.00 12,825.00 0.00 1.05 -0.29 FAIL - Minor 1/10 3M-27-3M-27AL4-01-3M-27AL4-01 wp00 12,825.00 12,825.00 0.00 1.05 -0.29 FAIL - Minor 1/10 310-27-310-27AL4-02-3M-27AL4-02_wp00 12,825.00 12,825.00 0.00 1.05 -0.29 FAIL - Minor 1/10 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 313012017 4:48:08PM Page 2 COMPASS 5000.1 Build 74 ConocoPhillips Ifs 6400 6000- 5600- 5200, 4800 4400 24000 0 53600 3200- 0 r✓2800 2400 0 O t4 2000 1600 1200- 800 WO 111. BAKER HUGHES I......■■■■■■■...... aamsnamnw Nun WELLBORE DETAILS: 3M-2]AL3 ggFEREticE wPogMATION Project: Kuparuk River Unit 3M-27 Mepnetic Nunn: 29• +N/ -S +E/ -W Site: Kuparuk 3M Pad Easling u.aKen neu Parent Wellbore: 3M -27A ceadroN(NA1 geMena: wel 3-Rl,I-Nma Well: 3M-27 sreg4rc nsaam Te on M0: 12825.00 vxlrel MDl geMe wean_Leea WBllbare: 3M-27AL3 Inc Diq k� Be.W' TVDSS Sallm IYS) Rdumee: Sbl-ry.WN, O.OBE) Plan: 3M-27ALbwp02(3M.2713M-27AL3) TFace umec acct. m�T Annotation w+eew,m Drew q.Mersa: >uxrMaenoien11M2I) 80.95 280.92 6202.80 2562.10 -9972.76 Caogetion lMOpB: 1Nnmum CurveWre Ifs 6400 6000- 5600- 5200, 4800 4400 24000 0 53600 3200- 0 r✓2800 2400 0 O t4 2000 1600 1200- 800 WO 111. BAKER HUGHES I......■■■■■■■...... WELL DETAILS: 3M-27 +N/ -S +E/ -W Northing Easling Latitude Longitude 0.00 0.00 6016606.24 506294.30 70e 27' 23.753 N 149° 56'55.073 W Sec MD Inc Azi TVDSS +N/ -S +E/ -W Dleg TFace VSect Annotation 1 12825.00 80.95 280.92 6202.80 2562.10 -9972.76 0.00 0.00 1003.30 TIP/KOP 212895.00 97.12 253.79 6204.00 2558.87-10041.80 45.00 300.00 1029.95 Start 45 dls 3 13035.00 93.22 190.61 6189.94 2460.69 -10130.49 45.00 270.00 1152.54 End 45 cls, Start 7 dis 413185.00 92.08 180.16 6182.98 2311.72-10144.53 7.00 264.00 1297.33 4 5 13320.00 89.62 171.04 6180.98 2177.28-10134.18 7.00 255.00 1420A2 5 6 13520.00 88.18 184.97 6184.85 1977.94-10127.22 7.00 96.00 1605.06 6 713745.00 90.14 200.60 6188.16 1759.23-10176.84 7.00 83.00 1827.55 7 8 14200.00 93.28 232.31 6174.20 1398.06-10443.50 7.00 84.00 2258.14 8 9 14375.00 94.27 220.07 6162.64 1277.41-10569.28 7.00 275.00 2414.53 Planned TD at 14375.00 Ifs 6400 6000- 5600- 5200, 4800 4400 24000 0 53600 3200- 0 r✓2800 2400 0 O t4 2000 1600 1200- 800 WO 111. BAKER HUGHES I......■■■■■■■...... I■■■�����F10', ■■■■.no NOW 11111111111111111E1111E111..11---�-1111E111111� -140D0-13600-13200-12800.12400-12D00.11600-11200-10800-1040D-10000-9600 -9200 -8800 -8400 -8000 -7600 -7260 -6800 Mean Vertical Section at 200.000 (45 usft/in) TRANSMITTAL LETTER CHECKLIST WELL NAME: KA (A- 3M - � N PTD: ),I? -C)57 /Development Service _Exploratory Stratigraphic Test Non -Conventional FIELD: K4�Y./t,lc SIV POOL: l�ltQali K YtIVF,r Kik �Vut ! ��� Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. al7-OS 3 API No. 50-�- as 6V -D/ -9Q. (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2XB) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHEC PTD#:2170570 Compan Appr Date PKB 4/13/2017 Engineering Appr Date VTL 4/21/2017 Geology Appr Date PKB 4/13/2017 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 ALASKA_.IN_C Initial Class Permit fee attached _ _ _ NA Lease number appropriate. _ _ Yes Unique well name and number Yes Well located in a. defined. pool. _ _ _ Yes Well located proper distance from drilling unit boundary Yes Well located proper distance from other wells Yes Sufficient acreage available in drilling unit Yes If. deviated, is wellbore plat included Yes Operator only affected party.. Yes Operator has appropriate bond in force Yes Permit can be issued without conservation order. Yes Permit can be issued without administrative approval Yes Can permit be approved before 15 -day wait Yes Well located within area and strata authorized by Injection Order # (put 10# in comments). (For NA All wells. within 1/4. mile area of review identified (For service well only) NA Pre -produced injector: duration of preproduction less than 3 months. (For service well only) NA Nonconven, gas conforms to AS31.05.0300A.A),0.2.A-D) _ _ NA Conductor string. provided. _ _ _ _ NA Surface casing. protects all known USDWs _ NA CMT vol adequate to circulate on conductor & surf csg NA CMT vol adequate. to tie-in long string to. surf csg NA CMT will cover all known productive horizons No Casing designs adequate for C, T, B & permafrost. Yes Adequate tankage or reserve pit Yes If. a. re -drill, has a 10-403 for abandonment been approved _ NA Adequate wellbore separation proposed Yes If diverter required, does it meet regulations. NA Drilling fluid program schematic & equip list adequate Yes BOPEs,.do they meet regulation _ Yes BOPE. press rating appropriate; test to (put psig in comments) Yes Choke. manifold complies w/API RP -53 (May 84) _ _ Yes Work will occur without operation shutdown _ _ _ Yes Is presence of H2S gas probable Yes Mechanical. condition of wells within AOR verified (For service well only) NA Permit can be issued w/o hydrogen. sulfide measures No Data presented on potential overpressure zones Yes Seismic. analysis of shallow gas. zones NA Seabed condition survey (if off -shore) NA Contact name/phone for weekly progress reports [exploratory only] NA __. Well Name: KUPAR_UK RIV UNIT_3M-27AL3 Program DEV_ - _ _ Well bore seg DEVI-PEND GeoArea 00 Unit 11160 _ _ On/Off Shore On Annular Dispo ADL0025523, Surf Loc; ADL0025522, Portion of Well; ADL0355032, Top Prod Intem & TD. KRU 3M-27AL3_ KUPARUK RIVER,. KUPARUK.RIV OIL. -.490100,_ governed by Conservation. Order No, 432D. _ CO 432D contains no spacing restrictions with respect to drilling unit boundaries. CO 432D has no intefwell spacing. restrictions, Wellbore. will be more than 500' from an external property line where ownership or landownership changes. Conductor set in KRU 3M-27 Surface casing set in 3M-27 Surface casing set and fully cemented Productive. interval will be completed with slotted liner Rig has steel tanks; all waste to approved disposal wells. Anti -collision analysis complete; no major risk failures Max formation pressure is 4305 psig(13.4 ppg_EMW ); will drill w/ 8.6 ppg EMW and maintain overbal w/ MPD MPSP is 3684 psig; will test BOPs to 4200 psig H2S measures required Wells. on 3M -Pad are H2S-bearing. H2S measures required. Max. potential_ reservoir pressure is 13.4 ppg. EMW; will be drilled using 8.6 ping mud and MPD technique. Onshore development lateral to be drilled Geologic Engineering Public Commissioner: Date: Commissioner: Date Co ' sinner Date L{ ]ZS l tq J