Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-026DATA SUBMITTAL COMPLIANCE REPORT 7/2/2018 Permit to Drill 2180260 Well Name/No. COLVILLE RIV QANN CD2-4631-2-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20577-63-00 MD 7701 TVD 4079 Completion Date 4/6/2018 Completion Status 1-0I1- Current Status 1-0I1- UIC No REQUIRED INFORMATION - Mud Log No Samples No ✓ Directional Survey Yes DATA INFORMATION - - List of Logs Obtained: GR/RES (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Type Digital Med/Frmt Dataset Number Name Log Log Run Interval OH / ED C Scale Media No Start Stop CH Received Comments 29235 Digital Data 0 7701 __ 5/9/2018 Electronic Data Set, Filename: CD-2-4631-2-01 GAMMA RES.las ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 2MD Final.cgm ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-463L2-01 5MD Final.cgm ' ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 5TVDSS ' Final.cgm ED C 29235 Digital Data �5/9/2018 Electronic File: CD2-463L2-01 2MD Final.pdf ' ED C 29235 Digital Data P5/9/2018 Electronic File: CD2-463L2-01 5MD Final.pdf ED C 29235 Digital Data /'*'5/9/2018 Electronic File: CD2-4631-2-01 5TVDSS Final.pdf ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-463L2-01 EOW - NAD27.pdf . ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-463L2-01 EOW - NAD27.txt. ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 Final Surveys TD . 7701.csv ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 Final Surveys TD . 7701.xlsx ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 Survey Listing.txt ED C 29235 Digital Data , 5/9/2018 Electronic File: CD2-4631-2-01 Surveys.txt ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2- 01 _25_tapescan_BH I_CTK.txt ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-463L2-, 01 _5_tapescan_B H I_CTK.txt ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-463L2-01_output.tap . ED C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 2MD Final.tif _ AOGCC Page 1 of 3 Monday, July 2, 2018 • DATA SUBMITTAL COMPLIANCE REPORT 7/2/2018 Permit to Drill 2180260 Well Name/No. COLVILLE RIV QANN CD2-4631-2-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20577-63-00 MD 7701 TVD 4079 Completion Date 4/6/2018 - Completion Status 1-OIL Current Status 1-OIL UIC No ED C --- -- - 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 5MD Final.tif - ED Log C C 29235 Digital Data 5/9/2018 Electronic File: CD2-4631-2-01 5TVDSS Final.tif 29235 Log Header Scans 0 0 2180260 COLVILLE RIV QANN CD2-4631-2-01, LOG HEADERS ED C 29260 Digital Data 5/14/2018 Electronic File: CD2-4631-2-01 EOW - NAD27.pdf ED C 29260 Digital Data 5/14/2018 Electronic File: CD2-4631-2-01 EOW - NAD27.txt ' ED C 29260 Digital Data 5/14/2018 Electronic File: CD2-463L2-01 EOW - NAD83.pdf ED C 29260 Digital Data 5/14/2018 Electronic File: CD2-4631-2-01 EOW - NAD83.txt Log C 29260 Log Header Scans 0 0 2180260 COLVILLE RIV QANN CD2-4631-2-01 LOG HEADERS e ores amples --- -- Information: - — - - Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report Production Test Information / A Geologic Markers/Tops (�Yi COMPLIANCE HISTORY Completion Date: 4/6/2018 Release Date: 3/13/2018 Description Comments: Directional / Inclination Data Mechanical Integrity Test Information YY NA Daily Operations Summary V Date Comments Mud Logs, Image Files, Digital Data Y �NA Core Chips Y/��Q� Composite Logs, Image, Data Files Core Photographs Y / Cuttings Samples Y /�'fV1 Laboratory Analyses Y I' AOGCC Page 2 of 3 Monday, July 2, 2018 Is DATA SUBMITTAL COMPLIANCE REPORT 7/2/2018 Permit to Drill 2180260 Well Name/No. COLVILLE RIV QANN CD2-4631-2-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20577-63-00 MD 7701 TVD 4079 Completion Date 4/6/2018 Completion Status 1-0I1- Compliance Reviewed By Current Status 1-0I1- UIC No Date. - - 0 AOGCC Page 3 of 3 Monday, July 2, 2018 • � 21 8026 29260 Letter of Transmittal RA R Date: UGHMay 11, 2018 W company To: Makana Bender AOGCC 333 West 7' Ave, Suite 100 Anchorage, Alaska 99501 From: Yosha Ragbirsingh / Michael Soper Baker Hughes, a GE Company 795 East 941h Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): CD4-210B CD4-208AL1 CD2-463L1 CD2-463L1-01 CD2-463L2 CD2-463L2-01 CD4-211L1 CD4-211L1-01 (8) Total prints RECEIVED MAY 14 2018 Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael.Soper@BHGE.com Yosha Ragbirsingh, Baker Hughes, Survey Manager Yosha.Ragbirsingh@BHGE.com 21 8026 29 260 ConocoPhillips • ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD2 Alpine Pad C132-4631-2-01 50-103-20577-63 • Baker Hughes INTEQ i-UGHES a Definitive Survey Report GE company 07 May, 2018 ConocoPhillips ConocoPhillips Definitive Survey Report BA ER IUGHES GEwmpa�y Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: .......... Well CD2-463 Project: Western North Slope TVD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad MD Reference: CD2-463 @ 53.03usft (Doyon 19) Well: CD2-463 North Reference: True Wellbore: CD2-463 Survey Calculation Method: Minimum Curvature Design: CD2-463 Database: EDT Alaska Sandbox Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD2-463 Well Position +N/-S 0.00 usft Northing: 5,974,176.62usft Latitude: +E/-W 0.00 usft Easting: 371,429.10usft Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: Wellbore CD2-4631-2-01 Magnetics -SEr - M �; 1700 ff Model Namea� sa�ei becjltiatigrt pipATlgfe �ti BGGM2017 2/1 /2018 16.84 80.81 Design _..„..... .e., CD2-4631-2-01 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 5,386.41 Vertical Section: TO Depth From (TVD) +N/-S +El-W Direction (usft) ! d "J, (usft) (�) 37.33 0.00 0.00 90.00 700 20' 15.607 N 151 ° 2' 35.652 W 15.70 usft 57,444 51712018 12:09:51PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Company: ConocoPhiIli ps(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-463 Design: CD2-463 Survey Program Date 4/5/2018 From To (usft) (usft) Survey (Wellbore) 81.00 447.00 CD2-463 Gyro (CD2-463) 474.54 5,193.14 CD2-463 MWD+SAG+CA+IIFR+MS (CD 5,206.00 5,356.01 CD2-4631-2 MWD-INC (CD2-4631-2) 5,386.41 5,386.41 CD2-463L2 MWD (CD2-463L2) 5,413.00 5,413.00 CD2-4631-2-01 MWD-INC (CD2-4631-2-0 5,440.73 7,660.88 CD2-463L2-01 MWD (CD2-463L2-01) ConocoPhillips Definitive Survey Report Local Co-ordinate Referent TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Tool Name CB -GYRO -SS M WD+I FR-AK-CAZ-SC MWD-INC_ONLY (INC>10°) MWD MWD-INC_ONLY (INC>10°) MWD Well CD2-463 CD2-463 @ 53.03usft (Doyon 19) CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature EDT Alaska Sandbox Description Camera based gyro single shot MWD+IFR AK CAZ SCC MWD-INC_ONLY_FILLER ( INC>10°) MWD - Standard MWD-INC_ONLY_FILLER ( INC>10°) MWD - Standard Qw- Map Map MD Inc Azi TVD TVDSS +N/-S +El-W Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) 5.386.41 92.58 332.51 4,086.88 4,033.85 1,752.87 1,573.28 5,975,902.12 373,032.07 5,413.00 92.69 328.03 4,085.66 4,032.63 1,775.93 1,560.11 5,975,925.40 373,019.30 5,440.73 96.40 330.63 4,083.46 4,030.43 1,799.70 1,546.01 5,975,949.40 373,005.62 5,471.14 97.80 336.77 4,079.70 4,026.67 1,826.74 1,532.65 5,975,976.66 372,992.72 5,499.95 96.94 340.44 4,076.01 4,022.98 1,853.33 1,522.23 5,976,003.43 372,982.75 5,531.72 94.46 345.26 4,072.85 4,019.82 1,883.53 1,512.91 5,976,033.78 372,973.96 5,559.54 92.83 349.92 4,071.08 4,018.05 1,910.64 1,506.95 5,976,060.99 372,968.46 5,589.55 90.86 352.42 4,070.11 4,017.08 1,940.27 1,502.34 5,976,090.69 372,964.37 5,620.75 89.02 355.58 4,070.15 4,017.12 1,971.30 1,499.08 5,976,121.77 372,961.64 5,651.03 87.67 358.94 4,071.02 4,017.99 2,001.53 1,497.64 5,976,152.01 372,960.71 5,680.59 90.89 4.90 4,071.39 4,018.36 2,031.05 1,498.63 5,976,181.51 372,962.21 5,711.06 89.66 8.42 4,071.25 4,018.22 2,061.31 1,502.16 5,976,211.70 372,966.26 5,740.81 89.79 13.80 4,071.39 4,018.36 2,090.49 1,507.89 5,976,240.78 372.972.49 5,771.19 89.48 17.82 4,071.58 4,018.55 2.119.71 1,516.17 5,976,269.86 372,981.26 5,800.03 89.51 22.11 4,071.84 4,018.81 2,146.81 1,526.01 5,976,296.78 372,991.57 5,830.08 89.79 26.58 4,072.02 4,018.99 2,174.18 1,538.39 5,976,323.93 373,004.42 5,860.46 89.82 31.33 4,072.12 4,019.09 2,200.76 1,553.10 5,976,350.26 373,019.57 5,891,34 89.42 35.68 4,072.33 4,019.30 2,226.50 1,570.14 5,976,375.69 373,037.05 51712018 12:09:51PM Page 3 DLS (°/100') 18.11 16.84 16.32 20.56 12.98 16.99 17.71 10.60 11.72 11.95 22.91 12.24 18.09 13.27 14.87 14.90 15.64 14.15 Survey Start Date 7/3/2008 7/3/2008 3/30/2018 3/30/2018 4/1 /2018 4/1 /2018 BAKER Ji UGHES Survey End Date 7/3/2008 7/15/2008 3/30/2018 3/31/2018 4/1 /2018 4/4/2018 Vertical Section Survey Tool Name Annotation 1(573.28 MWD(4) TIP 1,560.11 MWD-INC_0NLY (INC>10°) (5) KOP 1,546.01 MWD (6) 1,532.65 MWD (6) 1,522.23 MWD (6) 1,512.91 MWD (6) 1,506.95 MWD (6) 1,502.34 MWD (6) 1,499.08 MWD (6) 1,497.64 MWD (6) 1,498.63 MWD (6) 1,502.16 MWD (6) 1,507.89 MWD (6) 1,516.17 MWD (6) 1,526.01 MWD (6) Interpolated Azimuth 1,538.39 MWD (6) 1,553.10 MWD (6) 1,570.14 MWD (6) COMPASS 5000.14 Build 85 • ConocoPhillips Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-463 Design: CD2-463 Survev MD (usft) 5,921.03 5,950.27 5,980.30 6,011.79 6,041.31 6,070.97 6,101.07 6,130.86 6,160.97 6,190.29 6,220.86 6,250.95 6,280.37 6,310.49 6,340.48 6,370.73 6,400.96 6,430.39 6,460.48 6,490.62 6,520.53 6,550.43 6,580.57 6,610.38 6,641.23 6,671.24 6,701.15 6,731.15 6,761.67 6,790.74 6,821 A8 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: Well CD2-463 TVD Reference: CD2-463 @ 53.03usft (Doyon 19) MD Reference: CD2-463 @ 53.03usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDT Alaska Sandbox Inc Azi TVD TVDSS +N/-S .� +E/-W (°) (°) (usft) (usft) (usft) (usft) 89.32 40.43 4,072.65 4,019.62 2,249.87 1,588.43 87.67 44.68 4,073.42 4,020.39 2,271.40 1,608.20 89.75 49.89 4,074.10 4,021.07 2,291.75 1,630.25 88.37 51.88 4,074.62 4,021.59 2,311.62 1,654.67 87.08 55.69 4,075.79 4,022.76 2,329.04 1,678.47 86.62 59.28 4,077.42 4,024.39 2,344.96 1,703.44 90.28 61.98 4,078.23 4,025.20 2,359.71 1,729.65 88.80 64.88 4,078.47 4,025.44 2,373.03 1,756.29 89.32 68.43 4,078.97 4,025.94 2,384.96 1,783.93 88.04 71.80 4,079.64 4,026.61 2,394.93 1,811.49 87.61 75.61 4,080.80 4,027.77 2,403.50 1,840.80 88.74 79.08 4,081.76 4,028.73 2,410.09 1,870.14 88.80 83.43 4,082.39 4,029.36 2,414.56 1,899.21 89.05 87.90 4,082.96 4,029.93 2,416.83 1,929.23 90.95 91.89 4,082.96 4,029.93 2,416.89 1,959.21 89.48 95.11 4,082.84 4,029.81 2,415.04 1,989.40 90.40 99.33 4,082.88 4,029.85 2,411.24 2,019.38 90.95 102.72 4,082.53 4,029.50 2,405.61 2,048.26 92.83 105.80 4,081.54 4,028.51 2,398.21 2,077.40 93.75 110.54 4.079.81 4,026.78 2,388.83 2,105.99 92.46 113.51 4,078.19 4,025.16 2,377.63 2,133.67 90.68 116.32 4,077.37 4,024.34 2,365.04 2,160.77 90.52 118.42 4,077.05 4,024.02 2,351.19 2,187.53 89.63 114.18 4,077.01 4,023.98 2,337.98 2,214.25 89.85 110.84 4,077.15 4,024.12 2,326.17 2,242.75 89.54 108.43 4,077.31 4,024.28 2,316.09 2,271.01 90.34 105.11 4,077.34 4,024.31 2,307.46 2,299.64 89.54 100.61 4,077.37 4,024.34 2,300.78 2,328.88 91.14 96.79 4,077.19 4,024.16 2,296.17 2,359.05 90.00 92.57 4,076.90 4,023.87 2,293.80 2,388.01 90.37 89.17 4,076.80 4,023.77 2,293.33 2,418.74 Map Map Northing Easting (ft) (ft) 5,976,398.74 373,055.75 5,976,419.93 373,075.87 5,976.439.90 373,098.27 5,976,459.34 373,123.03 5,976,476.35 373,147.11 5,976,491.84 373,172.35 5,976,506.14 373,198.81 5,976,519.00 373,225.67 5,976,530.45 373,253.51 5,976,539.94 373,281.23 5, 976, 548.01 373, 310.69 5,976,554.09 373,340.14 5,976,558.06 373,369.27 5,976,559.82 373,399.32 5,976,559.37 373,429.30 5,976,557.00 373,459.45 5,976,552.69 373.489.36 5,976,546.57 373,518.14 5,976,538.67 373,547.15 5,976,528.80 373,575.56 5,976,517.13 373,603.05 5,976,504.07 373,629.93 5,976,489.76 373,656.45 5,976,476.10 373,682.93 5, 976, 463.81 373, 711.22 5,976,453.24 373,739.30 5,976,444.13 373,767.78 5,976,436.95 373,796.90 5,976,431.82 373,826.97 5,976,428.95 373,855.89 5,976,427.96 373,886.61 DLS (°/100') 16.00 15.59 18.68 7.69 13.62 12.18 15.11 10.93 11.91 12.29 12.53 12.12 14.78 14.86 14.74 11.70 14.29 11.67 11.99 15.99 10.81 11.12 6.99 14.53 10.85 8.10 11.42 15.24 13.57 15.04 11.13 vnnical Section Survey Tool (ft) 1,588.43 MWD (6) 1,608.20 MWD (6) 1,630.25 MWD (6) 1,654.67 MWD (6) 1,678.47 MWD (6) 1,703.44 MWD (6) 1,729.65 MWD (6) 1,756.29 MWD (6) 1,783.93 MWD (6) 1,811.49 MWD (6) 1,840.80 MWD (6) 1,870.14 MWD (6) 1,899.21 MWD (6) 1,929.23 MWD (6) 1,959.21 MWD (6) 1,989.40 MWD (6) 2,019.38 MWD (6) 2,048.26 MWD (6) 2,077.40 MWD (6) 2,105.99 MWD (6) 2,133.67 MWD (6) 2,160.77 MWD (6) 2,187.53 MWD (6) 2,214.25 MWD (6) 2,242.75 MWD (6) 2,271.01 MWD (6) 2,299.64 MWD (6) 2,328.88 MWD (6) 2,359.05 MWD (6) 2,388.01 MWD (6) 2,418.74 MWD (6) "I% 5/7/2018 12:09:51PM Page 4 COMPASS 5000.14 Build 85 • • ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference Project: Western North Slope TVD Reference: Site: CD2 Alpine Pad MD Reference: Well: CD2-463 North Reference: Wellbore: CD2-463 Survey Calculation Method: Design: CD2-463 Database: Survey H - Map Well CD2-463 CD2-463 @ 53.03usft (Doyon 19) CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature EDT Alaska Sandbox MD Inc Azr ND Northing Easting (usft) (°) (°) (usft), (usft) (usft) ( {ft% . O 6,850.36 92.24 85.41 4,076.15 4,023.12 2,294.70 2,447.58 5,976,428.83 373,915.46 6,880.38 92.76 83.51 4,074.84 4,021.81 2,297.59 2,477.43 5,976,431.21 373,945.35 6,909.17 93.97 86.65 4,073.15 4,020.12 2,300.06 2,506.06 5,976,433.19 373,974.02 6,940.69 92.46 89.24 4,071.38 4,018.35 2,301.18 2,537.50 5,976,433.77 374,005.48 6,971.54 89.48 93.56 4,070.86 4,017.83 2,300.43 2,568.33 5,976,432.49 374,036.28 7,000.80 92.73 98.79 4,070.29 4,017.26 2,297.28 2,597.40 5,976,428.85 374,065.29 7,030.30 92.09 103.08 4,069.05 4,016.02 2,291.69 2,626.33 5,976,422.76 374,094.12 7,060.13 91.26 108.16 4,068.18 4,015.15 2,283.67 2,655.04 5,976,414.25 374,122.68 7,090.53 90.49 111.42 4,067.71 4,014.68 2,273.38 2,683.63 5,976,403.47 374,151.10 7,120.24 92.64 115.56 4,066.90 4,013.87 2,261.54 2,710.86 5,976,391.17 374,178.12 7,151.28 88.89 117.60 4,066.49 4,013.46 2,247.66 2,738.61 5,976,376.82 374,205.63 7,180.13 86.34 119.61 4,067.69 4,014.66 2,233.86 2,763.92 5,976,362.59 374,230.69 7,210.80 88.89 120.46 4,068.96 4,015.93 2,218.53 2.790,44 5,976,346.80 374,256.94 7,240.56 88.19 118.19 4,069.72 4,016.69 2,203.96 2,816.38 5,976,331.79 374,282.62 7,270.91 87.33 116.08 4,070.91 4,017.88 2,190.12 2,843.37 5,976,317.50 374,309.37 7,300,79 87.51 114.47 4,072.25 4,019.22 2,177.38 2,870.36 5,976,304.29 374,336.13 7,331.58 88.25 110.65 4,073.39 4,020.36 2,165.58 2,898.77 5,976,292.01 374,364.33 7,360.99 88.83 107.26 4,074.14 4,021.11 2,156.03 2,926.57 5,976,281.98 374,391.97 7,390.73 89.79 103.86 4,074.50 4,021.47 2,148.05 2,955.21 5,976,273.52 374,420.47 7,420.93 88.37 100.94 4,074.99 4,021.96 2,141.57 2,984.70 5,976,266.53 374,449.84 7,450.75 90.40 99.33 4,075.31 4,022.28 2,136.32 3,014.05 5,976,260.78 374,479.09 7,481.61 89.51 94.72 4,075.33 4,022.30 2,132.55 3,044.67 5,976,256.49 374,509.64 7,510.37 89.20 90.66 4,075.65 4,022.62 2,131.20 3,073.39 5,976,254.64 374,538.33 7,541.81 90.67 87.38 4,075.69 4,022.66 2,131.74 3,104.82 5,976,254.64 374,569.76 7,570.47 89.66 84.01 4,075.61 4,022.58 2,133.89 3,133.40 5,976,256.30 374,598.37 7,601.04 90.18 81.02 4,075.65 4,022.62 2,137.87 3,163.70 5,976,259.76 374,628.73 7,631.32 89.20 79.99 4,075.81 4,022.78 2,142.87 3,193.57 5,976,264.25 374,658.68 7,660.88 86.56 77.81 4,076.91 4,023.88 2,148.55 3,222.55 5,976,269.43 374,687.75 7,701.00 86.56 77.81 4,079.32 4,026.29 2,157.01 3,261.69 5,976,277.22 374,727.03 DLS (°/100.) Section Survey Tool Name (ft) 14.54 2,447.58 MWD (6) 6.56 2,477.43 MWD (6) 11.67 2,506.06 MWD (6) 9.50 2,537.50 MWD (6) 17.01 2.568.33 MWD (6) 21.04 2,597.40 MWD (6) 14.69 2,626.33 MWD (6) 17.25 2,655.04 MWD (6) 11.02 2,683.63 MWD (6) 15.70 2,710.86 MWD (6) 13.75 2,738.61 MWD (6) 11.25 2,763.92 MWD (6) 8.76 2,790.44 MWD (6) 7.98 2,816.38 MWD (6) 7.50 2,843.37 MWD (6) 5.42 2,870.36 MWD (6) 12.63 2,898.77 MWD (6) 11.69 2,926.57 MWD (6) 11.88 2,955.21 MWD (6) 10.75 2,984.70 MWD (6) 8.69 3,014.05 MWD (6) 15.21 3,044.67 MWD (6) 14.16 3,073.39 MWD (6) 11.43 3,104.82 MWD (6) 12.28 3,133.40 MWD (6) 9.93 3,163.70 MWD (6) 4.70 3,193.57 MWD (6) 11.58 3,222.55 MWD (6) 0.00 3,261.69 PROJECTED to TD notation BA ER IUGHES ` GFcompanv 5/7/2018 12:09:51PM Page 5 COMPASS 5000.14 Build 85 • 0 STATE OF ALASKA 0 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG la. Well Status: Oil 21 . Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 1b. Well Class: Development ❑� Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Aband.: •4/6/2018 14. Permit to Drill Number / Sundry: 218-026 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: •4/2/2018 15. API Number: 50-103-20577-63-00 4a. Location of Well (Governmental Section): Surface: 2185' FNL, 1805' FEL, Sec 2, T11N, R4E, UM' Top of Productive Interval: 410' FNL, 243' FEL, Sec 2, T11 N, R4E, UM Total Depth: 29' FNL, 3821' FEL, Sec 1, T11N, R4E, UM 8. Date TD Reached: .4/4/2018 16. Well Name and Number: CRU CD2-463L2-01 ' 9. Ref Elevations: KB:53.0; • GL:15.70 • BF: 17. Field / Pool(s): Coleville River Field/Qannik Oil Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation:,#b/- z S` ADL 380075, ADL 387212, ADL 380096 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 371429 y- 5974177 Zone- 4 TPI: x- 37301`9 y- 5975926 Zone- 4 Total Depth: x- 374727 y- 6976277 Zone- 4 11. Total Depth MDfTVD: • 7701/4079 • 19. DNR Approval Number: LONS 97-007 12. SSSV Depth MD/TVD: 2690/2441 20. Thickness of Permafrost MDlTVD: 1600/1539 5. Directional or Inclination Survey: Yes I] • (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: • 5413/4086 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER FT GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT PULLED TOP BOTTOM TOP BOTTOM 16 62.5 H-40 37 114 37 114 24 Pre -installed 10 3/4 45.5 L-80 37 2616 37 2376 13.5 375 sx ASLite, 278 sx Class G 7 5/8 29.7 L-80 37 5149 37 4076 9 7/8 256 sx Class G 3 1/2 9.3 L-80 5027 10886 4063 4089 6,75 ISlotted Liner 2 3/8 4.6 L-80 1 5189 7701 4079 4079 3 Slotted Liner 24. Open to production or injection? Yes E] • No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd)- 51 `$ SLOTTED LINER@ k 1 5190 - 7701 MD and 4079 - 4079 TVD 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 4 1/2x 3 1/2 128' x 5049' 4557'/3921' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No I] . Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 4/8/2018 Method of Operation (Flowing, gas lift, etc.): GAS LIFT Date of Test: 4/19/2018 Hours Tested: 3 Production for Test Period Oil-Bbl: 125 Gas-MCF: 231 Water-Bbl: 10 Choke Size: - Gas -Oil Ratio: 944 Flow Tubing Press. 217 Casinq Press: 831 Calculated 24-Hour Rate -1p, Oil-Bbl: 1 920 Gas-MCF: 869 Water- Bbl: 8 Oil Gravitv - API (corr): 30 Form 10-407 Revised 5/2017 T` �� ` CONTINUED ON PAGE 2 Submit RIGINIAL or 61V, Rapn�s �c�t ��r a eats «ram • • 28. CORE DATA Conventional Core(s): Yes ❑ No Fz] * Sidewall Cores: Yes ❑ No 0 , If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No Fz] If yes, list intervals and formations tested, briefly summarizing test Permafrost - Top Surface Surface Permafrost - Base 1600 1539 results. Attach separate pages to this form, if needed, and submit Top of Productive Interval 6413 4086 detailed test information, including reports, per 20 AAC 25.071. Formation @ TPI -Qannik Reservoi TD 7701 4080 Formation at total depth: Qannik Reservoir 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontoloaical report. in orwll test results. per 20 AAC 27. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: William Lon Authorized Title: Staff CTD Engineer Contact Email: William. R.Long(a)co .com Authorized Contact Phone: 263-4372 Signature: Date: INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only CD2-463 CTD Schematic 16" 65# H-40 shoe @ 114' MD 10-3/4" 45.5# L-80 shoe @ 2615' MD Updated: 6-Apr-2018 (WRL) Tubing from 5049' RKB to surface ?" Liner from 10877' RKB to 5027" RKB 2" ELIE x 4-1/2" IBTM XO @ 128' RKB (Y ID) ico TRMAXX-5E SSSV @ 2690' RKB (min ID 2.812") cc KBMG GLMs @ 3404' & 4500' RKB ;r Premier Packer @ 4557' RKB (2.87" ID) XN Nipple @ 4668' RKB (milled out to 2.80") :G @ 5025' RKB �r HR Liner Setting Sleeve @ 5027' RKB �r RS Packoff Seal Nipple @ 5041' RKB �r Flex Lock Hanger @ 5044' RKB 2" x 4-1/2" XO @ 5054' RKB ( 3.95" ID) 3-1/2" Liner shoe @ 10877' MD KOP @ 5206' MD IKOP 8586' MD KOP @ 8627' MD Billet Stuck in Windo ______-------------------------- - u CD2-46311 - - - BI- 2-463 L2-01 @ 7701' MD CD2-463L2 @ 5189' MD TD @ 7656, MD Billet at 5414' MD Liner @ 10,617' MD Billet @ 8622' MD CD2-463 L 1-01 TD @ 10,686' MD Liner @ 10,623' MD TOL (a) 8513' MD • • WNS PROD AP hlWell Attrib ConocoPhillips WellboreAP11C,wirlilw Fieltl Nan 501032057700 QANNIK comment SSSV:TRDP -t WO: CD2-463 TD 7/1 R/9nnA HORIZONTAL -CD2-463,5/8/20187.34.42 AM Last Tag ertca sc ematw actua Annotation Last Tag. Depth (RKB) End Date Last Imosbor Mod By Last Rev Reason HANGER 314 Annotation End Date Last Mod By Rev Reason. GLV C/O (#2-OV) 1/11/2018 pproven Casing Strings Casing Description OD (in) ID (in) Top (RKB) Set Depth (RKB) Set Depth (ND)... WtlLen (I Grade Top Threatl CONDUCTOR 16 15,250 34.0 114.0 114.0 65.00 HAO WELD Casing Description OD (in) ID (in) Top (RKB) Set Depth (RKB) Set Depth (ND)... WtlLen (I... Grade Top Thread CONDUCTOR; 34.0-114.0 SURFACE 10314 9.950 36.7 2,615.5 2,376.9 45.50 L-80 BTC-M Casing Description OD (in) ID (in) Top (RKB) Set Depth (RKB) Set Depth (ND)... WtlLen (I... Grade Top Thread INTERMEDIATE 75/8 6.875 34A 5,148.6 4,076.1 29.70 L-80 BTCM Casing Description OD (in) ID (in) Top (RKB) Set Depth (RKB) Set Depth (ND)... WtlLen (I... Grade Top Thread LINER 31, 2.992 5,026.8 10,877.1 4,088.4 9.30 L-80 SLHT Liner Details Top (RKB) Top (ND) (RKB) Top Incl (°) Item Des Com Nominal to (in) SURFACE; 36.7-2,615.5� 5,026.8 4,063.0 83.36 SLEEVE Baker "HR" Liner Setting Sleeve 6.44 OD x 5.00 ID 5.000 5,040.7 4,064.6 83.11 NIPPLE Baker "RS" Packoff Seal Nipple 6.12 OD x 4.91 ID 4.910 SAFETY VLV; 2,690.1 5,044.4 4,065.1 83.04 HANGER Baker 5 112" x 7 518" Flex Lock Hanger 6.59 OD x 4.90 ID 4,900 5,053.7 4,066.2 82.87 XO XO - 5 1/2" L-80 BTC x 4 1/2" L-80 SLHT 5,57 OD 3.950 x 3.95 ID 5,069.01 4,068.1 1 83.14 XO XO - 4 1/2" SLHT x 3 1/2" SLHT 2.992 GAS LIFT; 3,841.2 Tubing Strings Tubing Description String Ma... ID (in) Top (RKB) Set Depth (R.. Set Depth (ND) (... Wt (Ib"' Grade Top Connection TUBING 31/2 2.992 31.4 5, 049.4 4,065.7 9.30 L-80 EUE-M Completion Details Top (ND) Top Incl Nominal Top (RKB) (RKB) (°) Item Des Com ID (in) 31.4 31.4 0.00 HANGER FMC 4 112" Tbg hanger w/ 2.24' pup 4.500 GAS LIFT; 4,500.3 128.1 128.0 0.23 XO XO - 3 1/2" FEE (P) X 4 1/2" IBTM (B) 5.21" OD x 3.00" ID 3.000 2,690.1 2,440.E 31.94 SAFETY VLV 3 112" Carrico TRMAXX-5E SSSV w/ 2.813" profile (TC-ll B x P)ser 2,812 # CXS0024 PAcI<ER, assza 4.557.4 3,920.5 59.99 PACKER Baker 3.5" x 7 5/8" Premier Packer 6.58" OD x 2.87" ID 2870 4.667.8 3,971.4 64.79 NIPPLE 3.5" HES "XN" Nipple 2,800 (MILLED 2.80" on 12/5/2017) NIPPLE, 4,667_8 5,024.9 4,062,81 83.40 WLEG 1PUP - 3 112" IBT Tubing W/Mule shoe WLEG 24.46' 1 2.992 Perforations & Slots Shot WLEG; 5,024.9 Top (RKB) Top Btm (RKB) (ND) (RKB) Btm (ND) (RKB) Zone Date Dens (shotsllt ) Type Com 5,165.0 5,258.0 4,077.4 4,082.7 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted CD2-463 pipe 5,414.0 5,661.0 4,082.7 4,080.7 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted CD2-463 pipe 5,849.0 6,346.0 4,078.3 4,079.8 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted CD2463 pipe 6,408.0 6,626.0 4,082.0 4,083.8 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted CD2-463 pipe INTERMEDIATE; 34.45,148.E 6.810.0 7,807.0 4,081.0 4,092.3 K-2 CD2463 Marker, 7/18/2008 32.0 SLOTS Alternating solid/Slotted pipe 8,053.0 8,271.0 4,091.9 4,090.7 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted CD2-463 pipe WHIPSTOCK -MONOBORE; 5,2(6.0 LI SLOTS; 5,le5.o5,2se.o� ! $,333.0 8,706.0 4,090.5 4,088.6 K-2 CD2-463 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted pipe 8.827.0 10,594.0 4,085.9 4,073.3 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted CD2-463 pipe 10,657.0 10,7%0 4,076.2 4,081.1 K-2 Marker, 7/18/2008 32.0 SLOTS Alternating solid/slotted SLOTS; 5,414.0-5,661.0 j- CD2463 pipe Mandrel Inserts at i SLOTS; 5,849A8,346.0 N Top (RKB) Top (ND) (RKB) Make Model OD (in) Sery Valve Type Latch Type Port Size (in) T Run (psi) (p Run Date Com 1 3,841.2 3,404.1 CAMCO KBMG 1 GAS LIFT DMY BK 0.000 0.0 7/17/2008 2 4,500,3 3,890.7 CAMCO KBMG 1 GAS LIFT OV BK 0.250 0.0 1/5/2018 SLOTS; 8,408.66,826.0 Ir� SLOTS; 6,810.0-7,807.0 ! SLOTS; 8,053.08,271.0 SLOTS; 8,333.0A,706.0 f SLOTS; 8,827.0-10,594.0 1 1 sLors; 10s57.0-10,750.0I I LINER; 5,026.8-10,877.1 COt'10fcPNIlip5 Alaska, Itir 'l�`"1 7m:2Z0797 501032057760 PROD CD2-463L1 D ITD dd 7'il 7/1 A/90nA HORIZONTAL -CD2-463L1, 5/e/201874428AM Last Tag W-077emahc xtoa ...................................................................................... Annotation Depth (ftKB) End Date Last Mod By Last Rev Reason HANGER; 31.4 ......................................... Annotation End Date Last Mod By Casing Strings Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... W1Len (I... Grade Top Thread L1 Liner 2 3/8 1.992 8,622.0 10,617.1 4,084.4 4.70 L-80 ST-L Liner Details CONDUCTOR; 34.0-114.0 Top (kKB) Top (TVD) (kKB) Top Incl (°) Item Des Com Nom in) ID (in) 8,622.0 1 4,089.1 89.98 Billet Liner Top Billet 0.000 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (TVD) Top Top Incl Top (ftKB) (°) Des Com Run Date ID (in) 8,626,5 4,089.1 89.99 WHIPSTOCK- TOWS 8626.5' 3/21/2018 1.000 1 MONOBORE 1 SURFACE; 38.7-2,875.5 SAFETY VLV; 2,690.1 GAS LIFT; 3,841.2 GAS LIFT, 4,51M.3 PACKER; 4,557.4 NIPPLE; 4,687.8 WLEG, 5,024.9 �i INTERMEDIATE; 34.4-5,148.8 WHIPSTOCK-MONOBORE; 5,208.0 7 SLOTS; 5,165.03,258.0 I 11 SLOTS; 5,414.06,881.0 � I SLOTS; 5,849.0-6.348.0 SLOTS; 6,408.0-6,626.0 r SLOTS; 6,810.0-7,807.0 SLOTS; 8,053,047,271.0 SLOTS; 8,333.0-0708.0� LINER; 5,026.8-10:877.1 WHIPSTOCK- MONOBORE; 8,626.5 Li Lln,, 8S62 10,617.1 ConocoPhillips flask,,, In: WNS PROD CD2-4630-01 Well Attribj& 1MaxAnq1ftD 1TD 7/1 RnnnR HORIZONTAL -CD2-463L1-01,518/20187:45:23AM Last Tag erbw -hiiniabc Annotation Depth (ftKB) Entl Date Last Motl By ............................................................ Last Rev Reason HANGER; 31.4 Annotation End Date Last Mod By Casing Strings Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (ND)... WtlLen (I... Grade Top Threatl 4 L1-01 Liner 23/8 1.992 8,513.1 1Q623.3 4,086.9 4.60 L-80 STL Liner Details CONDUCTOR, 34.0-114 0— Top (ftKB) I Top (ND) (ftKB) I Top Ind (°) I Item Des Com Nominal ID 1 (in) 8,513.1 4,089.2 90.22 Deployment Shorty Deployment Sleeve 1.000 Sleeve 1 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top (TVD) Top Incl Top (ftKB) (ftKB) (°J Des Com Run Date ID (in) 8,585.0 4,089.1 90.05 WHIPSTOCK- TOWS 8585' 3/26/2018 SURFACE: 36.7-2,615.5 MO NOBORE SAFETY VLV;. 2, 690 1 GAS LIFT. 3, 841 2 GAS LIFT; 4,500.3 PACKER; 4557.4 NIPPLE; 4,667.0 WLES, 5,024.9 INTERMEDIATE; 34.4-5,148.8 WHIPSTOCK-MONOBORE; 5,2060 SLOTS; 5.165.06,2510 = -4 + SLOTS; 5,414.05,661.0 M 1 SLOTS; 5,849.0-6,346.0 I 1- SLOTS; 6,408.0$,828.0 _ ' SLOTS; 6,810o-7,807.0 II i SLOTS; 8,053.0-8,271.0 SLOTS; 8,333.0i7,706.0� LINER; 5,028.8-10,8T7.1 �. WHIPSTOCK- MONOBORE; 8,585.0 I� L1-01 Liner; 8,513.1-10,623.3� WNS PROD CD2-463L2 Conoo Phillips HORIZONTAL -CD2A63L2,518/20187,46.03AM Last Tag bi9ca sc emahc actua Annotation Depth (ftKB) End Date Last Mod By ............................................ Last Rev Reason HANGER; 31.4 Annotation End Date Last Mod By ................................. Casing Strings Casing Description OD (in) ID (in) Top IRKS) Set Depth INKS) Set Depth (TVD)... 1I-en (L.. Grade Top Thread L2 Liner 2 A 1.992 5,414.2 7,656.0 4,066.7 4.70 L-80 ST-L Liner Details Top (ftKB) Top (TVD) (ftKB) I Top Incl (°) Item Des Com Nominal ID (in) CONDUCTOR; 34.0-114.0 6,874.3 4,077.9 90.12 Deployment sleeve Shorty Deployment Sleeve 2.630 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) Top(TVD) Topincl Top INKS) (ftKB) I I. Des Corn Run Date ID (in) 5,206.0 4,080.3 86.49 WHIPSTOCK- TOWS 5206 3/29/2018 1.000 MONOBORE SURFACE, W 7-2,615.5J SAFETY VLV, 2.690.1 GAS LIFT, 3, 841.2 GAS LIFT; 4,5D0.3 PACKER; 4,557.4 NIPPLE; 4,667.8 WLEG, 5024.9 INTERMEDIATE; 34.4-5,148.6 WHIPSTOCK-MONOBORE; 5,206.0 SLOTS; 5,165.06,258.0 LINER; 5,026.8-10,677.1 I �f L2 Liner, 5,414.2-7,656.0� ConocclPhillips WNS PROD ►i': Well Attrib Wellbore APIIUWFIW Field Nan 501032057763 OANNIK Comment PROD X2-01 5,471.131 7,701 711812008 HORIZONTAL -CD2-063L2-01,5/6/20187:46:56 AM Last Tag awca sc ema c actua Annotation Depth (ftKB) I End Date Last Mod By Last Rev Reason Annotation End Date Last Mod By HANGER, 31.4 Casing Strings Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... Wt/Len (I... Grade Top Thread Liner, L2-01 23/8 1.992 5,189.5 7,701.0 4.60 L-80 STL Liner Details Nominal ID Top (ftKB) Top (TVD) (ftKB) Top In C) Item Des Co. (in) 5,189.5 4,079.2 86.01 Deployment Shorty Deployment Sleeve 1.000 Sleeve CONDUCTOR; 34.0-1140 SURFACE; 36.7-2,615.5 SAFETY VLV: 2, 680.1 GAS LIFT. 3, 841 2 GAS LIFT; 4,500.3 PACKER: 4, 557 4 NIPPLE; 4,667.8 WLEG; 5,024.9 INTERMEDIATE; 34.4-5,148.8 SLOTS; 5,165.0-5,258.0 I I LINER; 5,026.8-10,877.1 1 Liner, 1-2-01; 5.189.5-7.701.0 Iterations Summary (with Timelogtepths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/18/2018 3/18/2018 5.00 MIRU MOVE CTOP P Prep for reel swap, unlock reel, 0.0 0.0 06:00 11:00 remove UQC, boot wire, install stabbing cable & grapple, unstab coil & secure reel, lift out of saddles 3/18/2018 3/18/2018 2.50 MIRU MOVE CTOP P Remove hubs, break down TT hard- 0.0 0.0 11:00 13:30 line, complete all prep for reel swap, PJSM with Peak & Nabors 3/18/2018 3/18/2018 1.00 MIRU MOVE CTOP P Pick 2-3/8" reel from rig, replace/install 0.0 0.0 13:30 14:30 2" reel (#52347) 3/18/2018 3/18/2018 6.00 MIRU MOVE CTOP P Install spacer plate, reel has weld on 0.0 0.0 14:30 20:30 ouside of guide ring (should be on inside of ring, ongoing issue), grind/buff weld to fit spacer ring, install hubs, lower reel in saddles, install saddle clamps, secure reel 3/18/2018 3/19/2018 3.50 MIRU MOVE RURD P RD checklist, ND BOPE 0.0 0.0 20:30 00:00 3/19/2018 3/19/2018 3.00 MIRU MOVE RURD P Complete RD checklist, RU to NES 0.0 0.0 00:00 03:00 sows 3/19/2018 3/19/2018 2.20 MIRU MOVE MOB P Move from CD4-Pad to CD2-Pad 0.0 0.0 03:00 05:12 3/19/2018 3/19/2018 3.30 MIRU MOVE MOB P Spot sub & pits over CD2-463, move 0.0 0.0 05:12 08:30 shop & 1/2-way house to CD2-Pad 3/19/2018 3/19/2018 3.50 MIRU MOVE RURD P Place rig mats, hook up PUTZ, start 0.0 0.0 08:30 12:00 heating cellar, get COMMS up, work RU checklist, RU steam, secure landings, berm cellar 3/19/2018 3/19/2018 1.50 MIRU RIGMNT NUND P Set down BOPE's, rig up SSSV to 0.0 0.0 12:00 13:30 panel, NU BOPE "Rig accept 3/19 @ 13:30 hrs 3/19/2018 3/19/2018 4.50 MIRU RIGMNT RGRP P c/o injector riser, gripper blocks, begin 0.0 0.0 13:30 18:00 gooseneck rollers, begin change out rams 3/19/2018 3/20/2018 6.00 MIRU RIGMNT RGRP P Crew change, complete c/o rams, spot 0.0 0.0 18:00 00:00 shop & 1/2-way house, grab TT from CD4-Pad, working rebuild mud pump 1, hook up to high line 3/20/2018 3/20/2018 10.50 MIRU RIGMNT RGRP P Working inner reel iron and bulkhead, 0.0 0.0 00:00 10:30 complete change of parts for 2" coil. 3/20/2018 3/20/2018 2.50 MIRU RIGMNT RGRP P Prep for stabbing coil, stab coil 0.0 0.0 10:30 13:00 3/20/2018 3/20/2018 5.00 MIRU RIGMNT RGRP P Prep for displacing reel to fluid, install 0.0 0.0 13:00 18:00 CTC and nozzle, issue with pump VFD, lined out, primped pumps & coil, fill coil at 0.40 bpm slowly to avoid damaging a -line, bulkhead leaking, shut down re -tighten, continue displacing coil. 3/20/2018 3/20/2018 1.00 MIRU RIGMNT SFTY P Crew change, End of year meeting 0.0 0.0 18:00 19:00 with Rig crew and town team. 3/20/2018 3/20/2018 2.25 MIRU RIGMNT RGRP P MU, test joint, install CT counter 0.0 0.0 19:00 21:15 3/20/2018 3/20/2018 0.60 MIRU RIGMNT RGRP P Test inner reel valve, pac-off, and 0.0 0.0 21:15 21:51 stripper 3/20/2018 3/21/2018 2.15 MIRU RIGMNT RGRP P Install CTC, Pull test 40 k, rehead BHI 0.0 0.0 21:51 00:00 upper quick, test a -line (good -test), leak observed at CTC, cut CT connector, and re -prep, re -install CTC Page 1/18 Report Printed: 4/19/2018 Aerations Summary (with Timelogtepths) C D2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/21/2018 3/21/2018 0.30 MIRU RIGMNT CTOP P PT CTC 4,000 psi, leak observed at 0.0 0.0 00:00 00:18 CTC, cut CT connector, and re -prep, re -install CTC 3/21/2018 3/21/2018 2.20 MIRU RIGMNT CTOP T Pull test 40 k, rehead BHI upper quick, 0.0 0.0 00:18 02:30 test a -line (good -test), PT CTC 4,000 psi. o-ring cut. 3/21/2018 3/21/2018 8.10 MIRU WHDBOP BOPE P Start initial BOP test, witness waived 0.0 0.0 02:30 10:36 by AOGCC (Jeff Jones), Low 250 psi / High 3,500 psi 3/21/2018 3/21/2018 3.50 MIRU RIGMNT CTOP P Test PDL's, good test, Pull TWC 0.0 0.0 10:36 14:06 valve, Pump forward 3/21/2018 3/21/2018 2.50 PROD1 RPEQPT PULD P MU/PU whipstock, open SSSV, 0.0 72.0 14:06 16:36 bullhead wellbore displacement. 3/21/2018 3/21/2018 1.00 PROM RPEQPT WPST P RIH, w/WS setting BHA# 1, w/open 72.0 3,000.0 16:36 17:36 EDC 3/21/2018 3/21/2018 0.25 PROD1 RPEQPT CTOP P Adjust gooseneck 3,000.0 3,000.0 17:36 17:51 3/21/2018 3/21/2018 0.25 PROM RPEQPT TRIP P Continue IH 3,000.0 4,400.0 17:51 18:06 3/21/2018 3/21/2018 0.20 FROM RPEQPT DLOG P Log the K2 marker correction of plus 4,400.0 4,469.0 18:06 18:18 10.0' 3/21/2018 3/21/2018 0.20 PROD1 RPEQPT TRIP P Continue IH 4,469.0 4,600.0 18:18 18:30 3/21/2018 3/21/2018 0.30 PROM RPEQPT DLOG P Log formation to confirm tie-in, no 4,600.0 4,644.0 18:30 18:48 correction 3/21/2018 3/21/2018 1.60 PROM RPEQPT TRIP P Continue IH 4,644.0 8,280.0 18:48 20:24 3/21/2018 3/21/2018 0.30 PROM RPEQPT DLOG P Log formation marker closer to setting 8,280.0 8,393.0 20:24 20:42 dept, plus 19.0' 3/21/2018 3/21/2018 1.30 PROM RPEQPT DLOG P Forward logs to town, confirm with 8,393.0 8,393.0 20:42 22:00 town team, plan forward pertaining to depth control. 3/21/2018 3/21/2018 0.20 PROM RPEQPT TRIP P Planforward, continue IH past setting 8,393.0 8,750.0 22:00 22:12 depth 3/21/2018 3/21/2018 0.20 PROM RPEQPT TRIP P Pull back up hole to 8,500' 8,750.0 8,500.0 22:12 22:24 3/21/2018 3/21/2018 0.30 PROD1 RPEQPT DLOG P Log CCL from 8,500'to 8,750' @16 8,500.0 8,802.0 22:24 22:42 fpm 3/21/2018 3/21/2018 0.30 PROM RPEQPT DLOG P Correlate log, log uploaded to the 8,802.0 8,802.0 22:42 23:00 s:drive. 3/21/2018 3/21/2018 0.15 PROM RPEQPT TRIP P PUH to setting depth 8,802.0 8,635.5 23:00 23:09 3/21/2018 3/21/2018 0.10 PROD1 RPEQPT WPST P PU 18 k, bring pump online 1.0 bpm 8,635.5 8,635.5 23:09 23:15 up to shear pressure 4,017 psi, set down 4,5 k 3/21/2018 3/22/2018 0.75 PROM RPEQPT TRIP P PUW, 18k, line up across the top with 8,635.5 4,385.0 23:15 00:00 fluids. continue POOH 3/22/2018 3/22/2018 0.25 PROM RPEQPT TRIP P Continue POOH, pumping across the 4,385.0 2,980.0 00:00 00:15 top 3/22/2018 3/22/2018 0.75 PROM RPEQPT TRIP T Notice half moon marks on coil, stop 2,980.0 2,980.0 00:15 01:00 and inspect gripper blocks and gooseneck rollers. (No Findings), upload pictures to s:drive. 3/22/2018 3/22/2018 0.50 PROM RPEQPT TRIP P Continue POOH 2,980.0 72.7 01:00 01:30 3/22/2018 3/22/2018 0.50 PROM RPEQPT PULD P Check well for flow, PJSM with rig 72.7 72.7 01:30 02:00 crew 3/22/2018 3/22/2018 0.50 PROM RPEQPT PULD P LID setting tools on a dead well 72.7 0.0 02:00 02:30 Page 2/18 Report Printed: 4/19/2018 Iterations Summary (with TimelogRepths) n CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/22/2018 3/22/2018 2.00 PROM RPEQPT CTOP P Lockout storage reel, inspect and 0.0 0.0 02:30 04:30 torque reel saddle clamps and hubs, 3/22/2018 3/22/2018 1.00 PROM WHPST PULD P PU/MU milling BHA 0.0 63.0 04:30 05:30 3/22/2018 3/22/2018 1.10 PROM WHPST TRIP P RIH w/ BHA #2 window milling BHA 63.0 4,595.0 05:30 06:36 3/22/2018 3/22/2018 0.30 PROM WHPST DLOG P Tie into GR for +2' correction 4,595.0 4,648.0 06:36 06:54 3/22/2018 3/22/2018 0.60 PROM WHPST TRIP P Continue RIH 4,648.0 8,210.0 06:54 07:30 3/22/2018 3/22/2018 0.60 PROM WHPST DLOG P Tie into GR for +5.5' correction 8,210.0 8,351.0 07:30 08:06 3/22/2018 3/22/2018 0.10 PROD1 WHPST TRIP P Continue RIH 8,351.0 8,605.0 08:06 08:12 3/22/2018 3/22/2018 1.40 PROM WHPST CIRC P Circulate power down coil, bullhead 8,605.0 8,627.0 08:12 09:36 power backside, bullhead 50 bbl. Hi- Vis pill and spot on whipstock, Weight check PU 24k 3/22/2018 3/22/2018 5.40 PROM WHPST WPST P Dry tag whipstock, PU 24k, begin 8,627.0 8,632.0 09:36 15:00 milling window per procedure. 1.54 bpm @ 3,724psi, CWT=1.1k, WOB=1.7k, BHP=2,461psi, Diff=681 psi. 3/22/2018 3/22/2018 1.30 PROM WHPST WPST P Continue milling window per plan 1.5 8,632.0 8,635.0 15:00 16:18 bpm @ 3,629psi, CWT=2.39k, WOB=0.05k, BHP=2467psi, Diff=567psi seeing sand in returns. 3/22/2018 3/22/2018 0.60 PROM WHPST WPST P Out of window, begin drilling rat hole, 8,635.0 8,648.0 16:18 16:54 1.5 bpm @ 3,781 psi CWT=0.88k, WOB=1.62k, BHP=1407psi, Diff=735psi 3/22/2018 3/22/2018 1.15 PROM WHPST WPST P Back ream rat hole and window 8,648.0 8,648.0 16:54 18:03 3/22/2018 3/22/2018 0.20 PROM WHPST WPST P Calibrate choke at the window, 1.77 8,648.0 8,620.0 18:03 18:15 bpm at 3,938 psi, Ann Press. 2,413 psi, sesor depth 4,036 (TVD), 11,49 ppg EMW, input and print new tripping schedule 3/22/2018 3/22/2018 1.00 PROM WHPST TRIP P POOH 8,620.0 63.2 18:15 19:15 3/22/2018 3/22/2018 1.75 PROD1 WHPST PULD P At surface, tag up, space out, PUD 63.2 0.0 19:15 21:00 and LD window milling BHA# 2 *** Note: Window mill and string reamer gauged 2.79 OD no-go. 3/22/2018 3/22/2018 0.50 PROM DRILL CTOP P Slid INJC forward, install nozzle, stab 0.0 0.0 21:00 21:30 onto stump, jet stack, MM's, and surface lines @ 1.8 bpm 3/22/2018 3/22/2018 1.15 PROM DRILL PULD P PJSM, PD lateral drilling BHA# 3 0.0 78.2 21:30 22:39 3/22/2018 3/22/2018 0.80 PROM DRILL TRIP P Tag up, reset counters, RIH w/ Iatreral 78.2 4,585.0 22:39 23:27 drilling BHA# 3 3/22/2018 3/22/2018 0.20 PROM DRILL DLOG P Log gamma signiture, no correction 4,585.0 4,647.0 23:27 23:39 3/22/2018 3/23/2018 0.36 PROM DRILL TRIP P Continue IH 4,647.0 6,836.0 23:39 00:00 3/23/2018 3/23/2018 0.25 PROM DRILL TRIP P Continue IH 6,836.0 8,275.0 00:00 00:15 Page 3/18 Report Printed: 4/19/2018 tM"s4„�"",r° . Iterations Summary (with Timelog epths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/23/2018 3/23/2018 0.20 PROM DRILL DLOG P Log the lower gamma signature, 8,275.0 8,359.0 00:15 00:27 minus 3.0' 3/23/2018 3/23/2018 0.30 PROM DRILL TRIP P Continue IH 8,359.0 8,648.0 00:27 00:45 3/23/2018 3/23/2018 3.00 PROD1 DRILL DRLG P OBD, 1.8 bpm at 4,400 psi FS, 8,648.0 8,742.9 00:45 03:45 diff=1,111 psi FS, BHP 2409, WHP=36, IA 0, CA 561, CTSW=1.2 k, DHWOB=1.3 k, ROP 80 fpm. 3/23/2018 3/23/2018 2.70 PROM DRILL DRLG P OBD, 1.8 bpm at 4,637 psi, diff=1,359 8,742.9 8,838.0 03:45 06:27 psi, BHP=2,461, WHP=O, IA=O, OA=567, CTSW=O k, DHWOB=2.8 k, ROP=30 fph. *" Note: Seen RA @ 8632.5', TOWS @ 8626.5. 3/23/2018 3/23/2018 0.80 PROM DRILL DRLG P OBD, 1.77 bpm @ 4759psi, CWT=- 8,838.0 8,864.0 06:27 07:15 4.54k, WO13=2.79k, BHP=2500psi, Diff=1341 psi 3/23/2018 3/23/2018 0.10 PROM DRILL WPRT P Wiper to window, pulling 25fph due to 8,864.0 8,668.0 07:15 07:21 low returns: PU 21 k 3/23/2018 3/23/2018 0.10 PROM DRILL WPRT P Wiper down 8,668.0 8,864.0 07:21 07:27 3/23/2018 3/23/2018 3.30 PROM DRILL DRLG P BOBD, 1.76 bpm @ 4,808psi, CWT=- 8,864.0 9,064.0 07:27 10:45 5.2k, WOB=2.73k, BHP=2,490psi, Diff=1487 psi Avg. ROP=60fph PU 23K @ 8,934' 3/23/2018 3/23/2018 1.60 PROD1 DRILL WPRT P Wiper to WLEG. PU 20k 9,064.0 4,998.0 10:45 12:21 3/23/2018 3/23/2018 0.10 PROM DRILL WPRT P Wiper down 4,998.0 5,083.0 12:21 12:27 3/23/2018 3/23/2018 0.40 PROD1 DRILL DLOG P Tie into K2 for +7' correction 5,083.0 5,201.0 12:27 12:51 3/23/2018 3/23/2018 0.80 PROD1 DRILL WPRT P Wiper down 5,201.0 8,649.0 12:51 13:39 3/23/2018 3/23/2018 0.10 PROM DRILL DLOG P tie into RA for -4' correction 8,649.0 8,667.0 13:39 13:45 3/23/2018 3/23/2018 0.30 PROM DRILL WPRT P Wiper down 8,667.0 9,065.0 13:45 14:03 3/23/2018 3/23/2018 1.20 PROM DRILL DRLG P BOBD, 1.81 bpm @ 5184 psi, 9,065.0 9,134.0 14:03 15:15 CWT=3.39k, WOB=1.34k, BHP=2458psi, Diff=1578psi PU 19k @ 9081', PU 24K @ 9121' 3/23/2018 3/23/2018 0.60 PROM DRILL TRIP P Returns of 0.50 bpm, Pull into window 9,134.0 7,558.0 15:15 15:51 and lay in 35bbl Hi-Vis LSRV pill. 3/23/2018 3/23/2018 0.40 PROM DRILL TRIP P Cut pumps and RIH to window letting 7,558.0 8,649.0 15:51 16:15 pill soak into matrix 3/23/2018 3/23/2018 0.10 PROM DRILL DLOG P Tie into RA for +0.5' 8,649.0 8,667.0 16:15 16:21 3/23/2018 3/23/2018 0.30 PROM DRILL TRIP P Continue in hole pumping 0.34 bpm 8,667.0 9,136.0 16:21 16:39 3/23/2018 3/23/2018 3.50 PROM DRILL DRLG P BOBD, 1.8 bpm @ 5,015psi, 9,136.0 9,257.0 16:39 20:09 CWT=2.96k, WOB=1.03k, BHP=2523psi, Diff=1447psi, FS=1250psi. Returns still low, 0.50 bpm out, shut in choke and drill ahead with full losses @ 9,186' Page 4/18 Report. Printed: 4/19/2018 Summary Aerations (with Timeloggepths) ' CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/23/2018 3/23/2018 0.20 PROD1 DRILL WPRT P Notice, change in motorwork, PUW 27 9,257.0 9,157.0 20:09 20:21 k, Perfrom BHA wiper 3/23/2018 3/24/2018 3.65 PROM DRILL DRLG P BOBD, 1.8 bpm at 5,001 psi, 9,157.0 9,366.0 20:21 00:00 diff=1,307 psi, BHP 3,438, WHP 327, IA 0, OA 533, CTSW=minus 4 k, DHWOB=2.3 k, ROP 20 fph '** Note: Lost 300 psi pump pressure, ECD down 1.0 lb. crew performed walk thru, equipment and surface lines have containment. 3/24/2018 3/24/2018 2.75 PROM DRILL DRLG P OBD, 1.83 bpm at 5,102 psi, 9,366.0 9,550.0 00:00 02:45 diff=2,447 psi, BHP 2,448, WHP=225, IA 0, CA 531, CTSW= minus 4.5 k, DHWOB= 2.7 k, ROP 92 fph 3/24/2018 3/24/2018 1.00 PROD1 DRILL WPRT P Wiper up hole, PUW 23 k 9,550.0 5,000.0 02:45 03:45 3/24/2018 3/24/2018 0.65 PROM DRILL WPRT P Wiper back in hole 5,000.0 8,645.0 03:45 04:24 3/24/2018 3/24/2018 0.20 PROD1 DRILL DLOG P Log RA marker correction of minus 8,645.0 8,665.0 04:24 04:36 2.5' 3/24/2018 3/24/2018 0.40 PROD1 DRILL WPRT P Continue wiper to bottom 8,665.0 9,552.0 04:36 05:00 3/24/2018 3/24/2018 3.40 PROM DRILL DRLG P BOBD, 1.8 bpm @ 5,051ps, CWT=- 9,552.0 9,766.0 05:00 08:24 3.8k, WOB=2.42k, BHP=2,488psi, Diff=1,667psi 3/24/2018 3/24/2018 0.40 PROM DRILL DRLG P OBD 1.80 bpm @ 5,281psi, CWT=- 9,766.0 9,778.0 08:24 08:48 1.8k, WOB=2.15k, BHP=2487psi, Diff=1510psi 3/24/2018 3/24/2018 0.10 PROM DRILL WPRT P 200' wiper PU 25k 9,778.0 9,589.0 08:48 08:54 3/24/2018 3/24/2018 0.10 PROD1 DRILL WPRT P Wiper down 9,589.0 9,778.0 08:54 09:00 3/24/2018 3/24/2018 2.50 PROM DRILL DRLG P BOBD 1.8 bpm @ 4,787psi, 9,778.0 9,950.0 09:00 11:30 CWT=3.80psi, WOB=2.51k, BHP=2486psi, Diff=1058psi PU 24k @ 9919' 3/24/2018 3/24/2018 0.70 PROM DRILL WPRT P Wiper PU 23k, jog window 9,950.0 8,646.0 11:30 12:12 3/24/2018 3/24/2018 0.20 PROM DRILL DLOG P Tie into RA for +4' correction 8,646.0 8,671.0 12:12 12:24 3/24/2018 3/24/2018 0.40 PROM DRILL WPRT P Wiper down 8,671.0 9,954.0 12:24 12:48 3/24/2018 3/24/2018 2.30 PROD1 DRILL DRLG P BOBD, 1.78 bpm @ 4,919psi, CWT=- 9,954.0 10,220.0 12:48 15:06 4.84k, WOB=2.36k, BHP=2509psi, Diff=1285psi PU 22k @ 9,959' PU 23k @ 10,125' 3/24/2018 3/24/2018 0.10 PROM DRILL WPRT P 100' Wiper PU 24k 10,220.0 10,134.0 15:06 15:12 3/24/2018 3/24/2018 0.10 PROM DRILL WPRT P Wiper down 10,134.0 10,220.0 15:12 15:18 3/24/2018 3/24/2018 3.25 PROM DRILL DRLG P BOBD, 1.78 bpm @ 5,122psi, CWT=- 10,220.0 10,303.0 15:18 18:33 4.72k, WOB=2.83k, BHP=2566psi, Diff=1337psi, FS=1250psi 3/24/2018 3/24/2018 1.50 PROM DRILL WPRT P Wiper up hole, PUW 27 k, little bobble 10,303.0 5,000.0 18:33 20:03 seen at the TOW, 3/24/2018 3/24/2018 0.20 PROM DRILL SVRG P Inspect hub bolts and saddle clamps 5,000.0 5,000.0 20:03 20:15 1 1 15 min Page 5/18 Report Printed: 4/19/2018 Iterations Summary (with Timelogtepths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/24/2018 3/24/2018 0.58 FROM DRILL WPRT P Wiper back in hole, set down at the 5,000.0 8,650.0 20:15 20:49 BOW 8,632' 3X, turn TF 200°, pass thru clean. 3/24/2018 3/24/2018 0.20 PROD1 DRILL DLOG P Log the RA marker correction of plus 8,650.0 8,667.0 20:49 21:01 1.0, 3/24/2018 3/24/2018 0.60 PROM DRILL WPRT P Continue wiper in hole, RIW 3 k 8,667.0 10,303.0 21:01 21:37 3/24/2018 3/25/2018 2.38 PROM DRILL DRLG P BOBD, 1.78 bpm at 5,200 psi FS, 10,303.0 10,526.0 21:37 00:00 diff=1,300 psi, BHP 2,576, WHP 298, IA 0, CA 421, CTSW= minus 3.0 k, DHWOB=1.7 k, ROP 210 fph 3/25/2018 3/25/2018 5.30 PROM DRILL DRLG P OBD, 1.78 bpm at 5,470 psi, 10,526.0 10,700.0 00:00 05:18 diff=1,208 psi, BHP 2,640, WHIP 381, IA 0, CA 369, CTSW= minus 4.3 k, DHWOB=2 k, 3/25/2018 3/25/2018 2.60 PROM DRILL WPRT P TD called, pull wiper to WLEG, PU 10,700.0 5,000.0 05:18 07:54 21 k 3/25/2018 3/25/2018 0.70 PROD1 DRILL CIRC P Pull into WLEG, bullhead 25 bbl. clean 5,000.0 5,000.0 07:54 08:36 mud down coil annulus, obtain SBHP and confrim 11.5# KWF. 3/25/2018 3/25/2018 0.70 FROM DRILL WPRT P RIH & confrim TD 5,000.0 8,662.0 08:36 09:18 3/25/2018 3/25/2018 0.20 PROM DRILL DLOG P Tie into RA for +3' correction 8,662.0 8,668.0 09:18 09:30 3/25/2018 3/25/2018 0.70 PROD1 DRILL WPRT P Continue in hole, confirm TD @ 8,668.0 10,700.0 09:30 10:12 10,700, 3/25/2018 3/25/2018 0.60 PROD1 DRILL CIRC P Circulate liner running pill down coil. 10,700.0 10,700.0 10:12 10:48 3/25/2018 3/25/2018 2.70 PROM DRILL TRIP P Lay in 25 bbl. liner running pill 10,700.0 97.0 10:48 13:30 displaced by clean mud while POOH. 3/25/2018 3/25/2018 1.00 PROM DRILL CIRC P Bullhead 25 bbl liner running pill & 43 97.0 97.0 13:30 14:30 bbl. 11.5# KWF 3/25/2018 3/25/2018 1.00 COMPZ1 CASING PULD P Flow check good, PJSM, lay down 97.0 0.0 14:30 15:30 BHA #3. 3/25/2018 3/25/2018 5.25 COMPZ1 CASING PUTB P MU/PU BHA #4 (NP BN, 63 jnts 0.0 1,985.7 15:30 20:45 2.375" slotted liner (R2), Billet) 3/25/2018 3/25/2018 1.00 COMPZ1 CASING PULD P PJSM, PU/MU BHI CoilTrak tools 1,985.7 2,039.3 20:45 21:45 w/BOT 3.0" GS spear, lower into well, slide cart forward, inspect check valves in the upper quick, check pac- offs. 3/25/2018 3/25/2018 0.20 COMPZ1 CASING PULD P MU to liner, stab INJH onto stump, 2,039.3 2,093.3 21:45 21:57 surface test BHI Coiltrak tools (good - test) *** Note:Liner hanging weight 7.0 k 3/25/2018 3/25/2018 0.15 COMPZ1 CASING RUNL P Tag up, reset counters, RIH w/ L1 liner 2,093.3 8,539.0 21:57 22:06 segment with 63 jts of liner, liner top billet, and non -ported bullnose. BHA# 4 3/25/2018 3/25/2018 0.20 COMPZ1 CASING RUNL P Correct at the EOP flag, minus 6.0' 8,539.0 8,539.0 22:06 22:18 3/25/2018 3/25/2018 1.55 COMPZ1 CASING RUNL P Continue IH, stack out, 10,616' 8,539.0 10,616.0 22:18 23:51 3/25/2018 3/26/2018 0.16 COMPZ1 CASING RUNL T Work liner, pumping down the coil 10,616.0 10,616.0 23:51 00:00 Page 6/18 Report Printed: 4/19/2018 Iterations Summary (with Timelog epths) CD2-463 ... Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/26/2018 3/26/2018 2.00 COMPZ1 CASING RUNL T Continue working liner, 10,616' 10,616.0 10,616.0 00:00 02:00 *** Note: MU beaded/Lubed pill 42 bbl down the backside. 3/26/2018 3/26/2018 1.00 COMPZ1 CASING RUNL T Pump 11.0 ppg beaded pill down the 10,616.0 10,616.0 02:00 03:00 backside to window, work liner, no success, displace remaining pill in 10 bbl increments, working pipe, no success. *** Note: Contact town team, recieved plan forward. 3/26/2018 3/26/2018 0.80 COMPZ1 CASING RUNL T Release from liner, PUW 20 k 10,616.0 10,616.0 03:00 03:48 3/26/2018 3/26/2018 0.50 COMPZ1 CASING RUNL T Bring pump up to 1.5 bpm at 5,095 10,616.0 10,616.0 03:48 04:18 psi, work liner (no success), bring pump up to 1.8 bpm, work liner (no success 3/26/2018 3/26/2018 0.10 COMPZ1 CASING RUNL P Remove liner length from BHA 8,602' 10,616.0 8,602.0 04:18 04:24 3/26/2018 3/26/2018 1.25 COMPZ1 CASING TRIP P POOH 8,602.0 44.2 04:24 05:39 3/26/2018 3/26/2018 1.50 COMPZ1 CASING PULD P Tag up space out, PUD liner setting 44.2 0.0 05:39 07:09 tools 3/26/2018 3/26/2018 0.30 COMPZI CASING PULD P LD setting tools 0.0 0.0 07:09 07:27 3/26/2018 3/26/2018 3.00 PROD2 RPEQPT WPST T Standby waiting on tools from 0.0 0.0 07:27 10:27 Deadhorse 3/26/2018 3/26/2018 0.50 PROD2 RPEQPT PULD P PJSM, Load BOT WS into pipeshed, 0.0 0.0 10:27 10:57 inspect, measure 3/26/2018 3/26/2018 1.70 PROD2 RPEQPT PULD P PD, WS setting BHA# 5 0.0 72.2 10:57 12:39 3/26/2018 3/26/2018 1.36 PROD2 RPEQPT TRIP P Tag up, reset counters, RIH w/BOT 3- 72.2 4,605.0 12:39 14:00 1/2", mono -bore XL tray 3/26/2018 3/26/2018 0.20 PROD2 RPEQPT DLOG P Log the Gamma Marker, minus 1.0' 4,605.0 4,640.0 14:00 14:12 correction 3/26/2018 3/26/2018 0.50 PROD2 RPEQPT TRIP P Continue IH 4,640.0 8,280.0 14:12 14:42 3/26/2018 3/26/2018 0.20 PROD2 RPEQPT DLOG P Log Gamma Marker, correction of 8,280.0 8,357.0 14:42 14:54 minus 2.0'. 3/26/2018 3/26/2018 0.50 PROD2 RPEQPT TRIP P Continue IH, to setting depth 8,357.0 8,595.5 14:54 15:24 3/26/2018 3/26/2018 0.30 PROD2 RPEQPT TRIP P PUH, to log CCL 8,595.5 8,400.0 15:24 15:42 3/26/2018 3/26/2018 0.50 PROD2 RPEQPT DLOG P Log CCL down to 8,595.5' 8,400.0 8,595.5 15:42 16:12 3/26/2018 3/26/2018 0.20 PROD2 RPEQPT WPST P Bring pump up to shear 4,500 psi, set 8,595.5 8,585.0 16:12 16:24 down 4 k DHWOB 3/26/2018 3/26/2018 1.60 PROD2 RPEQPT TRIP P POOH 8,585.0 61.7 16:24 18:00 3/26/2018 3/26/2018 1.20 PROD2 RPEQPT PULD P At surface, space out, PUD WS 61.7 0.0 18:00 19:12 setting tools. 3/26/2018 3/26/2018 1.50 PROD2 WHPST PULD P PJSM, PU/MU/PD window milling 0.0 63.6 19:12 20:42 BHA# 6 3/26/2018 3/26/2018 1.30 PROD2 WHPST TRIP P RIH, BHA# 6, w/ BHI X-Treme motor, 63.6 4,595.0 20:42 22:00 10' pup joint, RR string reamer, and new WS DSM. Page 7/18 Report Printed: 4/19/2018 Aerations Summary (with Timelogtepths) C D2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/26/2018 3/26/2018 0.25 PROD2 WHPST DLOG P Log gamma marker, correction of 4,595.0 4,628.0 22:00 22:15 minus 1.5' 3/26/2018 3/26/2018 0.60 PROD2 WHPST TRIP P Continue IH 4,628.0 8,270.0 22:15 22:51 3/26/2018 3/26/2018 0.40 PROD2 WHPST DLOG P Log gamma marker, correction of 8,270.0 8,358.0 22:51 23:15 minus 2.0' 3/26/2018 3/26/2018 0.25 PROD2 WHPST TRIP P Continue IH 8,358.0 8,586.0 23:15 23:30 3/26/2018 3/26/2018 0.15 PROD2 WHPST TRIP P Dry tag TOWS 8,586' 8,586.0 8,586.0 23:30 23:39 3/26/2018 3/27/2018 0.34 PROD2 WHPST WPST P OBM, 1.81 bpm at 3,989 psi FS, 8,586.0 8,585.7 23:39 00:00 diff=379 psi, WHP=624, IA 0, OA 518 3/27/2018 3/27/2018 6.40 PROD2 WHPST WPST P OBM, 1.81 bpm at 4,470 psi, dill=379 8,585.7 8,590.4 00:00 06:24 psi, WHP 0, IA 0, OA 528 3/27/2018 3/27/2018 1.00 PROD2 WHPST WPST P Notice weight fall off indicating mill 8,590.4 8,591.7 06:24 07:24 exiting the tubing, continue milling as per procedure allowing string reamer to perform at 1 fph. 3/27/2018 3/27/2018 0.70 PROD2 WHPST WPST P Drill rat hole, 1.8 bpm at 4,491 psi, 8,591.7 8,606.5 07:24 08:06 diff=379 psi, WHP 0, BHP 2,455, IA 0, OA 605, CTSW=2.5 k, DHWOB=1.7 k, Avg ROP 12 fph 3/27/2018 3/27/2018 0.20 PROD2 WHPST REAM P TD rat hole, PUH to dress window 8,606.5 8,580.0 08:06 08:18 3/27/2018 3/27/2018 0.20 PROD2 WHPST REAM P Dress window area, 8,580.0 8,600.0 08:18 08:30 3/27/2018 3/27/2018 0.20 PROD2 WHPST REAM P PUH, dry drift window area 8,600.0 8,580.0 08:30 08:42 3/27/2018 3/27/2018 1.50 PROD2 WHPST TRIP P Open EDC, POOH 8,580.0 63.2 08:42 10:12 3/27/2018 3/27/2018 1.50 PROD2 WHPST PULD P At surface, PUD milling BHA 63.2 0.0 10:12 11:42 3/27/2018 3/27/2018 1.70 PROD2 DRILL PULD P PD, L1-01 lateral drilling BHA# 7 0.0 78.2 11:42 13:24 with .6° AKO motor and RB HCC PN TX25207, Surface test agitiator @ 500' 3/27/2018 3/27/2018 1.30 PROD2 DRILL TRIP P Trip in hole, Surface test agitiator @ 78.2 4,610.0 13:24 14:42 500' - Good. Continue in hole 3/27/2018 3/27/2018 0.10 PROD2 DRILL DLOG P Log GR tie in for -1.5' correction 4,610.0 4,624.0 14:42 14:48 3/27/2018 3/27/2018 1.10 PROD2 DRILL TRIP P Continue in well. weight check @ 4,624.0 8,606.0 14:48 15:54 8355 21 k. Clean pass through window, tag up @ 8606 3/27/2018 3/27/2018 4.10 PROD2 DRILL DRLG P 8606', Drill, 1.76 BPM @ 4822 PSI 8,606.0 8,959.0 15:54 20:00 FS, BHP=2415, Returns @ 1.2 BPM, ECD=11.48, 3/27/2018 3/27/2018 0.20 PROD2 DRILL WPRT P Short wiper trip, PUW=20K 8,959.0 8,959.0 20:00 20:12 3/27/2018 3/27/2018 0.40 PROD2 DRILL DRLG P 8959', Drill, 1.81 BPM @ 5367 PSI 8,959.0 9,000.0 20:12 20:36 FS, BHP=2521 3/27/2018 3/27/2018 0.80 PROD2 DRILL WPRT P 9000', Wiper trip to TT, PUW=20K 9,000.0 4,610.0 20:36 21:24 3/27/2018 3/27/2018 0.20 PROD2 DRILL DLOG P Log upper formation marker for +4.5' 4,610.0 4,626.0 21:24 21:36 3/27/2018 3/27/2018 0.60 PROD2 DRILL WPRT P Continue wiper back in well 4,626.0 8,290.0 21:36 22:12 3/27/2018 3/27/2018 0.40 PROD2 DRILL DLOG P Log lower formation marker for -2' 8,290.0 8,362.0 22:12 22:36 correction Page 8/18 Report Printed: 4/19/2018 Aerations Summary (with Timelogepths) x C D2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 3/27/2018 3/27/2018 0.40 PROD2 DRILL TRIP P Trip in hole, Log RA marker @ 8592', 8,362.0 9,002.0 22:36 23:00 TOWS= 8586, BOW=8590.5, continue in hole 3/27/2018 3/28/2018 1.00 PROD2 DRILL DRLG P 9002', Drill Ahead, 1.79 BPM @ 5149 9,002.0 9,113.0 23:00 00:00 PSI FS, BHP=2488, Returns @ 1.32 BPM, 9113 Midnight depth 3/28/2018 3/28/2018 1.80 PROD2 DRILL DRLG P 9113, Drill, 1.79 BPM @ 5149 PSI FS, 9,113.0 9,400.0 00:00 01:48 BHP=2488, Returns @ 1.3 BPM 3/28/2018 3/28/2018 0.30 PROD2 DRILL WPRT P 9400', Wiper to window, PUW=22K. 9,400.0 8,613.0 01:48 02:06 Clean trip up 3/28/2018 3/28/2018 0.10 PROD2 DRILL DLOG P Log RA for no correction 8,613.0 8,625.0 02:06 02:12 3/28/2018 3/28/2018 0.30 PROD2 DRILL WPRT P Continue wiper back in hole. returns 8,625.0 9,400.0 02:12 02:30 dropping off while RIH, Stacked @ 9393 fell through. Returns @ .5 BPM. Shut in choke before going back to drilling 3/28/2018 3/28/2018 2.60 PROD2 DRILL DRLG P 9400', Drill, 1.8 BPM @ 5057 PSI FS, 9,400.0 9,657.0 02:30 05:06 BHP=2373. Choke closed 3/28/2018 3/28/2018 0.20 PROD2 DRILL WPRT P 200' wiper up hole, PUW 25 k 9,657.0 9,657.0 05:06 05:18 3/28/2018 3/28/2018 1.40 PROD2 DRILL DRLG P BOBD, 1.79 bpm at 5,438 psi, 9,657.0 9,800.0 05:18 06:42 Diff=1,307 psi, WHP=348, IA 0, CA 576, Avg. ROP 200 3/28/2018 3/28/2018 2.20 PROD2 DRILL WPRT P Wiper up hole, PUW 24 k 9,800.0 5,048.0 06:42 08:54 3/28/2018 3/28/2018 0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW 2 k 5,048.0 8,610.0 08:54 09:12 3/28/2018 3/28/2018 0.10 PROD2 DRILL DLOG P Log the RA marker correction of plus 8,610.0 8,633.0 09:12 09:18 3.0' 3/28/2018 3/28/2018 0.50 PROD2 DRILL WPRT P Continue wiper in hole, RIW 1.3 k 8,633.0 9,800.0 09:18 09:48 3/28/2018 3/28/2018 1.70 PROD2 DRILL DRLG P BOBD, 1.81 bpm at 5,090 psi FS, 9,800.0 9,963.0 09:48 11:30 Diff=1,307 psi, WHP=354, IA 0, CA 580, Avg. ROP 150 3/28/2018 3/28/2018 0.20 PROD2 DRILL WPRT P BHA wiper up hole, PUW 23 k 9,963.0 9,963.0 11:30 11:42 3/28/2018 3/28/2018 2.30 PROD2 DRILL DRLG P BOBD, 1.8 bpm at 5,380 psi FS, 9,963.0 10,200.0 11:42 14:00 Diff=1,307 psi, WHP=354, IA 0, CA 580, Avg. ROP 150 3/28/2018 3/28/2018 0.50 PROD2 DRILL WPRT P Wiper up to the Window. PUW 25 k 10,200.0 8,600.0 14:00 14:30 3/28/2018 3/28/2018 0.15 PROD2 DRILL DLOG P Log RA marker correction of 8,600.0 8,623.0 14:30 14:39 3/28/2018 3/28/2018 0.60 PROD2 DRILL WPRT P Wiper back in hole, RIW 2 k 8,623.0 10,200.0 14:39 15:15 3/28/2018 3/28/2018 0.75 PROD2 DRILL DRLG P BOBD, 1.79 bpm at 5,300 psi FS, 10,200.0 10,400.0 15:15 16:00 diff=1506 psi, WHP 377, BHP 2618, IA 0, CA 624, Avg. ROP 100 fph 3/28/2018 3/28/2018 3.00 PROD2 DRILL DRLG P OBD, 1.78 bpm at 5„837 psi, 10,400.0 10,685.0 16:00 19:00 dill=1100 psi, WHP 369, BHP 2,623, IA 0, CA 623, IA 0, CA 623 3/28/2018 3/28/2018 1.40 PROD2 DRILL WPRT P Call TD @ 10685', Wiper trip to TT @ 10,685.0 5,016.0 19:00 20:24 5016 3/28/2018 3/28/2018 0.70 PROD2 DRILL PRTS P Stop and S/D pumps, Bleed off 5,016.0 5,016.0 20:24 21:06 pressure, Sensor @ 4056 TVD, BHP=2305 after 30 minutes, EMW=10.9. Pressure dropping slowly Page 9/18 Report Printed: 4/19/2018 "Y Iterations Summary (with TimelogRepths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth(WB) Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation End Depth (ftKB) 3/28/2018 3/28/2018 0.70 PROD2 DRILL WPRT P Continue back in hole to confirm TD 5,016.0 8,610.0 21:06 21:48 3/28/2018 3/28/2018 0.10 PROD2 DRILL DLOG P Log RA marker for +3' correction 8,610.0 8,624.0 21:48 21:54 3/28/2018 3/28/2018 0.70 PROD2 DRILL WPRT P Continue in hole to confirm TD. 9400' 8,624.0 10,686.0 21:54 22:36 area clean up and down. Call corrected TD @ 10,686' 3/28/2018 3/29/2018 1.40 PROD2 DRILL TRIP P Trip out of hole, Pumping 25 BBIs 10,686.0 5,486.0 22:36 00:00 8.6PPG beaded liner running pill, Paint EOP flags @ 8400 and 6300' 3/29/2018 3/29/2018 2.50 PROD2 DRILL TRIP P Continue trip out, roll coil to 11.1 PPG 5,486.0 75.0 00:00 02:30 completion fluid. Bullhead 8.8 PPG beaded liner running pill down backside followed by 45 BBIs 11.1 PPG Completion fluid 3/29/2018 3/29/2018 0.80 PROD2 DRILL OWFF P PJSM, Flow check well 30 min after 75.0 75.0 02:30 03:18 bed down after bullheading 3/29/2018 3/29/2018 1.00 PROD2 DRILL PULD P Unstab injector, Lay down tools on 75.0 0.0 03:18 04:18 dead well, BHA #7 3/29/2018 3/29/2018 4.00 COMPZ2 CASING PUTB P PJSM, P/U BHA # 8. L1-01 completion 0.0 2,110.2 04:18 08:18 with non ported bullnose, 68 Jts slotted 2 3/8" liner, and shorty deployment sleeve 3/29/2018 3/29/2018 0.60 COMPZ2 CASING PULD P PJSM, PU Coiltrak tools, surface test 2,110.2 2,154.4 08:18 08:54 (good -test), tag up reset counters 3/29/2018 3/29/2018 1.30 COMPZ2 CASING RUNL P RIH, w/ L1-01 liner BHA #8, 68 jts of 2,154.4 6,700.0 08:54 10:12 slotted liner, shorty deployment sleeve, and non -ported bullnose. 3/29/2018 3/29/2018 0.20 COMPZ2 CASING DLOG P Log the gamma marker correction 6,700.0 6,733.0 10:12 10:24 minus 1.5' 3/29/2018 3/29/2018 0.30 COMPZ2 CASING RUNL P Continue IH 6,733.0 8,458.0 10:24 10:42 3/29/2018 3/29/2018 0.10 COMPZ2 CASING RUNL P Stop at flag, minus 4.0', did not 8,458.0 8,458.0 10:42 10:48 change counter depth. 3/29/2018 3/29/2018 0.60 COMPZ2 CASING RUNL P Continue IH 8,458.0 10,123.0 10:48 11:24 3/29/2018 3/29/2018 3.50 COMPZ2 CASING RUNL P Stack weight, PU and work liner down 10,150.0 10,623.3 11:24 14:54 hole, 3/29/2018 3/29/2018 0.20 COMPZ2 CASING RUNL P Bring pump on line 1.4 bpm, PUW 10,623.3 10,623.3 14:54 15:06 20k, liner is released, TOL 8,513.13', BOL 10,623.3' 3/29/2018 3/29/2018 1.70 COMPZ2 CASING TRIP P Remove liner length from INJH 10,623.3 55.0 15:06 16:48 counter, POOH 3/29/2018 3/29/2018 1.00 COMPZ2 CASING PULD P At surface, PJSM, Lay down BHA #8 55.0 0.0 16:48 17:48 on dead well 3/29/2018 3/29/2018 1.00 PROD3 RPEQPT PULD P M/U BHA #9 whipstock, Set in 0.0 72.0 17:48 18:48 we1172.24 3/29/2018 3/29/2018 0.50 PROD3 RPEQPT CIRC P R/U hose to end of coil, recover 11.1 72.0 72.0 18:48 19:18 completion fluid out of CT 3/29/2018 3/29/2018 0.30 PROD3 RPEQPT PULD P Make up coil to BHA, Stab on injector, 72.0 72.0 19:18 19:36 tag up and set counters 3/29/2018 3/29/2018 1.00 PROD3 RPEQPT TRIP P RIH with whipstock, EDC open pump 72.0 4,565.0 19:36 20:36 min rate. No returns 3/29/2018 3/29/2018 0.20 PROD3 RPEQPT DLOG P Tie into GR for 0 correction 4,565.0 4,636.0 20:36 20:48 3/29/2018 3/29/2018 1.40 PROD3 RPEQPT DLOG P Make CCL pass 4636 to 5340. Log is 4,636.0 5,340.0 20:48 22:12 corrupt. PUH and repeat. Good log. Whipstock not across tool joint at setting depth. Page 10/18 Report Printed: 4/19/2018 Aerations Summary (with Timelogepths) A CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (WEI) 3/29/2018 3/29/2018 0.40 PROD3 RPEQPT TRIP P PUH to setting depth, Orient to 180° 5,340.0 5,215.5 22:12 22:36 ROHS. Close EDC, pumps on see setting tool shift at 4900 PSI, set down 3.5K 3/29/2018 3/29/2018 1.20 PROD3 RPEQPT TRIP P Trip out - Pre load window milling BHA 5,215.5 70.0 22:36 23:48 in PDL 3/29/2018 3/30/2018 0.20 PROD3 RPEQPT PULD P Tag up and space out 70.0 70.0 23:48 00:00 3/30/2018 3/30/2018 1.40 PROD3 RPEQPT PULD P Crew change out, Perform valve 70.0 0.0 00:00 01:24 check list. PJSM to PUD BHA #9 whipstock setting tools 3/30/2018 3/30/2018 1.60 PROD3 WHPST PULD P PD BHA #10 with straight motor, 2.80 0.0 63.6 01:24 03:00 window mill, and 2.79 string reamer. Make up to coil and surface test. Check pack offs. Tag up and set depths 3/30/2018 3/30/2018 0.90 PROD3 WHPST TRIP P Trip in hole, EDC open pumping min 63.6 4,605.0 03:00 03:54 rate 3/30/2018 3/30/2018 0.20 PROD3 WHPST DLOG P Log formation marker for -2.5' 4,605.0 4,633.0 03:54 04:06 correction 3/30/2018 3/30/2018 0.10 PROD3 WHPST TRIP P Continue in well, Dry tag whipstock @ 4,633.0 5,204.0 04:06 04:12 5204, PUW=19K. Close EDC 3/30/2018 3/30/2018 1.40 PROD3 WHPST MILL P Bring pumps on @ 1.8 BPM @ 4052 5,204.0 5,209.0 04:12 05:36 PSI FS, call pinch point @ 5203.7'. Mill window per procedure. 1.42 BPM returns. 3/30/2018 3/30/2018 2.75 PROD3 WHPST MILL P Start Auto Drill, 1.8 bpm at 4,087 psi, 5,209.0 5,206.0 05:36 08:21 diff= 616 psi, BHP 2,260, WHP 0, IA 0, OA 539 3/30/2018 3/30/2018 1.40 PROD3 WHPST MILL P Lost a little weight continue milling, 1.8 5,206.0 5,207.0 08:21 09:45 bpm at 4,052 psi, diff=616 psi, WHP 0, BHP=2,262, IA 0, OA 750 3/30/2018 3/30/2018 1.25 PROD3 WHPST MILL P Looks like we exited the tubing, 1.5k 5,207.0 5,208.7 09:45 11:00 to 0.6 k, continue milling at 1.0' fph, allowing string reamer to work 3/30/2018 3/30/2018 1.00 PROD3 WHPST MILL P Begin milling rat hole, 1.79 bpm at 5,208.7 5,225.0 11:00 12:00 3,823 psi, diff=540 psi, WHP 0 ,BHP 2,291, IA 0, OA 847, stall motor at 5,211', pickup and restart. 3/30/2018 3/30/2018 0.60 PROD3 WHPST REAM P Ream window area at 60 fph, twice, 5,225.0 5,225.0 12:00 12:36 dry drift area clean, 3/30/2018 3/30/2018 0.80 PROD3 WHPST TRIP P POOH, holding MP 10.8 ppg, holding 5,225.0 63.6 12:36 13:24 PJSM @ 1,500' 3/30/2018 3/30/2018 1.50 PROD3 WHPST PULD P Tag up, space out 12, PUD, and LID 63.6 0.0 13:24 14:54 window milling tools tools. Mill out at 2.79 NoGo 3/30/2018 3/30/2018 1.20 PROD3 DRILL PULD P PD, L2 lateral drilling BHA w/ HYC C1 0.0 78.2 14:54 16:06 bit and 1.1-° ako motor. "' Note: Check Pac-offs, (good) 3/30/2018 3/30/2018 0.90 PROD3 DRILL TRIP P RIH 78.2 4,610.0 16:06 17:00 3/30/2018 3/30/2018 0.10 PROD3 DRILL DLOG P Log the K2 marker correction -1.5', 4,610.0 4,632.0 17:00 17:06 close EDC 3/30/2018 3/30/2018 0.30 PROD3 DRILL TRIP P Continue in well, clean pass through 4,632.0 5,226.0 17:06 17:24 window, Tag up at 5226 3/30/2018 3/30/2018 1.70 PROD3 DRILL DRLG P 5226', Drill, 1.5 BPM @ 3951 PSI FS. 5,226.0 5,402.0 17:24 19:06 BHP=2291, Returns @ 1.3 BPM 3/30/2018 3/30/2018 0.30 PROD3 DRILL WPRT P Wiper trip up hole to tie in, PUW=20K 5,402.0 4,610.0 19:06 19:24 Page 11/18 Report Printed: 4/19/2018 Iterations Summary (with TimelogRepths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/30/2018 3/30/2018 0.10 PRODS DRILL DLOG P Log formation marker for +.5' 4,610.0 4,634.0 19:24 19:30 3/30/2018 3/30/2018 0.20 PRODS DRILL TRIP P RIH to log RA marker 4,634.0 4,635.0 19:30 19:42 3/30/2018 3/30/2018 0.10 PRODS DRILL DLOG P Log RA marker @ 5212, 5,225.0 5,360.0 19:42 19:48 TOWS=5206, BOW=52090.5 3/30/2018 3/30/2018 0.10 PRODS DRILL TRIP P Trip in to drill 5,360.0 5,402.0 19:48 19:54 3/30/2018 3/30/2018 2.10 PRODS DRILL DRLG P 5402', Drill, 1.8 BPM @ 5118 PSI FS, 5,402.0 5,810.0 19:54 22:00 BHP=2331, Returns @ 1.6 BPM 3/30/2018 3/30/2018 0.40 PRODS DRILL WPRT P Wiper trip to 5400' with sweeps, 5,810.0 5,810.0 22:00 22:24 PUW=20K 3/30/2018 3/31/2018 1.60 PRODS DRILL DRLG P 5810', Drill, 1.8 BPM @ 4832 PSI FS, 5,810.0 6,024.0 22:24 00:00 BHP=2339, Returns @ 1.54 BPM, RIW=3.7K, DHWOB=I.9K 3/31/2018 3/31/2018 2.00 PRODS DRILL DRLG P 6024', Drill, 1.8 BPM @ 4832 PSI FS, 6,024.0 6,218.0 00:00 02:00 BHP=2339, Returns @ 1.54 BPM, 3/31/2018 3/31/2018 0.60 PRODS DRILL WPRT P Wiper trip, PUW=20K, clean trip out 6,218.0 6,218.0 02:00 02:36 and in 3/31/2018 3/31/2018 5.00 PRODS DRILL DRLG P 6218', Drill, 1.8 BPM @ 4870 PSI FS, 6,218.0 6,610.0 02:36 07:36 BHP=2368, Returns @ 1.6 BPM, Wide Open choke, RIW=.2K with 1.9K DHWOB, Bleed OA down to 500 PSI 3/31/2018 3/31/2018 0.50 PRODS DRILL WPRT P Wiper up to the window, PUW 20 k 6,610.0 5,225.0 07:36 08:06 3/31/2018 3/31/2018 0.20 PRODS DRILL DLOG P log the RA marker correction of plus 5,225.0 5,258.0 08:06 08:18 2.0' 3/31/2018 3/31/2018 1.00 PRODS DRILL WPRT P Wiper back in hole, RIW 4 k 5,258.0 6,610.0 08:18 09:18 3/31/2018 3/31/2018 2.90 PRODS DRILL DRLG P BOBD, 1.8 bpm at 5,436 psi, 6,610.0 7,010.0 09:18 12:12 diff=1,220, WHP 0, BHP 2,511, IA 0, CA 687 "' Note: Lost weight while drilling @ 6,634', PUH, trouble getting back to bottom, work BHA back to bottom. 3/31/2018 3/31/2018 1.00 PRODS DRILL WPRT P Wiper up hole, PUW 20 k 7,010.0 6,000.0 12:12 13:12 3/31/2018 3/31/2018 0.60 PRODS DRILL WPRT P Wiper back in hole, RIW 4 k 6,000.0 7,010.0 13:12 13:48 3/31/2018 3/31/2018 2.40 PRODS DRILL DRLG P BOBD, 1.8 bpm at 4,960 psi, diff=710 7,010.0 7,272.0 13:48 16:12 psi, WHP=O, BHP 2,508, IA 0, CA 759, CTSW=minus 5.0k, DHWOB=1.4 -2.Ok, avg. ROP 103 fph 3/31/2018 3/31/2018 0.20 PRODS DRILL WPRT P BHA wiper up hole, PUW 20 k 7,272.0 7,272.0 16:12 16:24 3/31/2018 3/31/2018 1.70 PRODS DRILL DRLG P BOBD, 1.8 bpm at 5,380 psi FS, diff 7,272.0 7,362.0 16:24 18:06 1,186 psi, WHP 0, BHP 2,595, IA 0, CA 772, 3/31/2018 3/31/2018 0.20 PRODS DRILL WPRT P P/U to check weight / pressure, 7,362.0 7,362.0 18:06 18:18 PUW=22K, Off bottom FS=5293 @ 1.8 BPM 3/31/2018 3/31/2018 0.90 PRODS DRILL DRLG P 7362Drill, 1.8 BPM @ 5293 PSI FS, 7,362.0 7,410.0 18:18 19:12 BHP=2586 3/31/2018 3/31/2018 0.70 PRODS DRILL WPRT P 1 000'wiper trip, PUW=21 K, Clean trip 7,410.0 7,410.0 19:12 19:54 Page 12118 Report Printed: 4/19/2018 Aerations Summary (with TimelogRepths) CD2-463 ...: Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 3/31/2018 3/31/2018 2.20 PROD3 DRILL DRLG P 7410', Drill, 1.8 BPM @ 5293 PSI FS, 7,410.0 7,587.0 19:54 22:06 BHP=2572 3/31/2018 3/31/2018 0.10 PROD3 DRILL WPRT P BHA Wiper, PUW=20K 7,587.0 7,587.0 22:06 22:12 3/31/2018 3/31/2018 0.80 PROD3 DRILL DRLG P 7587', Drill 1.8 BPM @ 5344 PSI FS, 7,587.0 7,607.0 22:12 23:00 BHP=2591 3/31/2018 3/31/2018 0.30 PROD3 DRILL WPRT P 200' wiper, low surface weight, 7,607.0 7,607.0 23:00 23:18 PUW=20K 3/31/2018 4/1/2018 0.70 PROD3 DRILL DRLG P 7607', Drill, 1.8 BPM @ 5344 PSI FS, 7,607.0 7,636.0 23:18 00:00 BHP=2586 4/1/2018 4/1/2018 1.00 PROD3 DRILL DRLG P 7636', Drill, 1.8 BPM @ 5316 PSI FS, 7,636.0 7,654.0 00:00 01:00 BHP=2593 4/1/2018 4/1/2018 0.30 PROD3 DRILL WPRT P Call TD, PUH for 10 X 10 Sweeps, 7,654.0 7,654.0 01:00 01:18 RBIH 4/1/2018 4/1/2018 1.90 PROD3 DRILL WPRT P Sweeps coming out, chase to swab, 7,654.0 74.0 01:18 03:12 PUW=20K, Perform jog at surface. 4/1/2018 4/1/2018 1.20 PROD3 DRILL WPRT P Tag up at surface, Reset counters, 74.0 4,610.0 03:12 04:24 Run back in well 4/1/2018 4/1/2018 0.20 PROD3 DRILL DLOG P Log formation for -1.5' correction 4,610.0 4,636.0 04:24 04:36 4/1/2018 4/1/2018 0.20 PROD3 DRILL WPRT P Continue in 4,636.0 5,200.0 04:36 04:48 4/1/2018 4/1/2018 0.30 PROD3 DRILL PRTS P Stop and perform static, sensor 5,200.0 5,200.0 04:48 05:06 TVD=4077, Annular pressure @ 2258 PSI still slowly dropping, 10.7 PPG EMW 4/1/2018 4/1/2018 1.20 PRODS DRILL WPRT P Mixing beaded liner running pill while 5,200.0 7,636.0 05:06 06:18 RIH, confirm TD 7,656' 4/1/2018 4/1/2018 2.40 PROD3 DRILL TRIP P POOH, laying in 11.0 ppg completion 7,636.0 78.2 06:18 08:42 fluid, painting EOP flags @ 2,800' (White), and 5,360' (Yellow) 4/1/2018 4/1/2018 1.20 PROD3 DRILL PULD P PJSM, LID drilling BHA on a dead well 78.2 0.0 08:42 09:54 4/1/2018 4/1/2018 0.40 COMPZ3 CASING PUTB P Prep rig floor for MU liner, PJSM 0.0 0.0 09:54 10:18 4/1/2018 4/1/2018 1.50 COMPZ3 CASING PUTB P PU, Lower L2, 2-3/8", slotted liner 0.0 781.7 10:18 11:48 completion w/25 jts 4/1/2018 4/1/2018 0.50 COMPZ3 CASING PULD P PU/MU Coiltrak tools, surface test 781.7 825.9 11:48 12:18 (good -test) 4/1/2018 4/1/2018 1.10 COMPZ3 CASING RUNL P RIH, with L2 liner competion BHA# 12, 825.9 5,365.0 12:18 13:24 25 jts of slotted liner, shorty deployment sleeve, and non -ported bullnose. 4/1/2018 4/1/2018 0.20 COMPZ3 CASING DLOG P Log the K2 marker correction of minus 5,365.0 5,393.0 13:24 13:36 2.0' 4/1/2018 4/1/2018 0.60 COMPZ3 CASING RUNL P Continue I w/L2 liner lower segment. 5,393.0 7,656.0 13:36 14:12 4/1/2018 4/1/2018 0.20 COMPZ3 CASING RUNL P Tag bottom 4k, PU 35 k breakover, 7,656.0 7,656.0 14:12 14:24 PUW 22 k, bring pump on line 1.5 bpm, 961 psi diff, PUW 19 k, remove liner length from counters 4/1/2018 4/1/2018 1.50 COMPZ3 CASING TRIP P POOH, pumping across the top. 7,656.0 44.2 14:24 15:54 4/1/2018 4/1/2018 0.50 COMPZ3 CASING PULD P LID, setting tools on a dead well. 44.2 0.0 15:54 16:24 4/1/2018 4/1/2018 0.40 COMPZ3 CASING PUTB P Prep RF for liner ops. 0.0 0.0 16:24 16:48 4/1/2018 4/1/2018 2.50 COMPZ3 CASING PUTB P PU/MU upper L2 liner segment w/47 0.0 1,460.1 16:48 19:18 1 jts of slotted liner and liner top billet. Page 13/18 Report Printed: 4/19/2018 operations Summary TimelogRepths) (with CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation Start Depth (ftKB) End Depth (ftKB) 4/1/2018 4/1/2018 0.80 COMPZ3 CASING PULD P PJSM, P/U coil trak, M/U to liner. Stab 1,460.1 1,504.3 19:18 20:06 on coil and surface test. Tag up and set counters 4/1/2018 4/1/2018 0.80 COMPZ3 CASING TRIP P Trip in hole, BHA #13. EDC open 1,504.3 5,108.0 20:06 20:54 pumping min rate 4/1/2018 4/1/2018 0.10 COMPZ3 CASING DLOG P Stop and correct to flag, -3.8', 5,108.0 5,104.0 20:54 21:00 PUW=21 K 4/1/2018 4/1/2018 0.70 COMPZ3 CASING TRIP P Continue in hole. Clean pass through 5,104.0 6,874.0 21:00 21:42 window with billet. Tag up at 6874. PUW=26K 4/1/2018 4/1/2018 0.10 COMPZ3 CASING TRIP P Bring on pumps 1.54 BPM @ 3980 6,874.0 5,378.0 21:42 21:48 PSI. Pickup off liner, PUW=18K, Subtract liner length left in hole 1460.10 4/1/2018 4/1/2018 1.10 COMPZ3 CASING TRIP P POOH, BHA#13 5,378.0 53.0 21:48 22:54 4/1/2018 4/1/2018 0.40 COMPZ3 CASING PULD P PJSM, Lay down BHA on dead well 53.0 0.0 22:54 23:18 4/1/2018 4/2/2018 0.70 PROD4 DRILL PULD P M/U 1-2-01 lateral BHA with 1.1° AKO 0.0 78.0 23:18 00:00 motor, Agitator, and Bi Center, M/U to coil and surface test, Check pack offs 4/2/2018 4/2/2018 0.20 PROD4 DRILL PULD P Stab on injector, Fill hole, Tag up and 78.0 78.0 00:00 00:12 set counters 4/2/2018 4/2/2018 0.90 PROD4 DRILL TRIP P Trip in well BHA #14 78.0 4,615.0 00:12 01:06 4/2/2018 4/2/2018 0.10 PROD4 DRILL DLOG P Log formation for-2' correction 4,615.0 4,634.0 01:06 01:12 4/2/2018 4/2/2018 0.20 PROD4 DRILL TRIP P Continue RIH 4,634.0 5,190.0 01:12 01:24 4/2/2018 4/2/2018 0.80 PROD4 DRILL CIRC P PUH slowly while recovering 11.0 5,190.0 5,180.0 01:24 02:12 PPG NaBr, Close EDC 4/2/2018 4/2/2018 0.20 PROD4 DRILL TRIP P Trip in hole, Clean pass through 5,180.0 5,413.4 02:12 02:24 window. Dry tag liner top billet @ 5413 4/2/2018 4/2/2018 1.80 PROD4 DRILL MILL P PUH, PUW=18K, RIH tag @ 5412.4. 5,412.5 5,413.5 02:24 04:12 Start time milling 1 FPH, 1.77 BPM @ 5289 PSI FS, BHP=2377 4/2/2018 4/2/2018 0.50 PROD4 DRILL DRLG P 5313.5, Got to 2 FPH, 1.77 BPM @ 5,413.5 5,414.5 04:12 04:42 5289 PSI FS, BHP=2361 4/2/2018 4/2/2018 0.75 PROD4 DRILL DRLG P Go to 3 FPH, 1.77 BPM @ 5289 PSI 5,414.5 5,476.0 04:42 05:27 FS, BHP=2362 4/2/2018 4/2/2018 0.20 PROD4 DRILL WPRT P PUH, drydrift kickoff point clean, PUW 5,476.0 5,403.0 05:27 05:39 19 k 4/2/2018 4/2/2018 0.15 PROD4 DRILL WPRT P RBIH 5,403.0 5,476.0 05:39 05:48 4/2/2018 4/2/2018 6.20 PROD4 DRILL DRLG P BOBD, 1.79 bpm at 5,471 psi, Diff= 5,476.0 5,907.0 05:48 12:00 1,260 psi, WHP 0, BHP 2,348, IA 0, OA 383 4/2/2018 4/2/2018 0.30 PROD4 DRILL WPRT P Wiper up hole, to billet PUW 19 k 5,907.0 5,210.0 12:00 12:18 4/2/2018 4/2/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 3 k 5,210.0 5,907.0 12:18 12:36 4/2/2018 4/2/2018 2.75 PROD4 DRILL DRLG P BOBD, 1.79 bpm at 5,480 psi, 5,907.0 6,027.0 12:36 15:21 diff=1,260 psi, WHP 0, WHP 2,345, IA 0, OA 384 4/2/2018 4/2/2018 2.00 PROD4 DRILL DRLG P OBD, 1.80 bpm at 5,094 psi on 6,027.0 6,113.0 15:21 17:21 bottom, diff=1,260, WHP 0, BHP 2,344, IA 0, OA 383 Page 14/18 Report Printed: 4/19/2018 operations Summary Timeloggepths) (with J, CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftK8) End Depth (ftKB) 4/2/2018 4/2/2018 0.15 PROD4 DRILL WPRT P 100', BHA wiper up hole, PUW 20 k 6,113.0 6,113.0 17:21 17:30 4/2/2018 4/2/2018 0.50 PROD4 DRILL DRLG P BOBD, 1.81 bpm at 5,195 psi FS, 6,113.0 6,145.0 17:30 18:00 diff=143 psi, WHP=O, BHP=2,377, IA 0, OA 381 4/2/2018 4/2/2018 0.15 PROD4 DRILL WPRT P PUH 20', check weights and pressure. 6,145.0 6,145.0 18:00 18:09 4/2/2018 4/2/2018 1.75 PROD4 DRILL DRLG P BOBD, 1.80 bpm at 5,281 psi FS, 6,145.0 6,231.0 18:09 19:54 diff=208 psi, WHP=O, BHP=2,381, IA 0, OA 382 4/2/2018 4/2/2018 0.15 PROD4 DRILL WPRT P 100' BHA wiper up hole, PUW 25 k 6,231.0 6,231.0 19:54 20:03 4/2/2018 4/2/2018 1.35 PROD4 DRILL DRLG P BOBD, 1.78 bpm at 5,141 psi FS, 6,231.0 6,310.0 20:03 21:24 diff=196 psi, WHP=O, BHP=2,381 psi, IA 0, OA 382 4/2/2018 4/2/2018 0.30 PROD4 DRILL WPRT P 800', wiper up hole, PUW 21 k 6,310.0 5,510.0 21:24 21:42 4/2/2018 4/2/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 3.4 k 5,510.0 6,310.0 21:42 22:00 Note: Pressure spike, PUH, RIH, pressure back to FS, continue IH 4/2/2018 4/3/2018 2.00 PROD4 DRILL DRLG P BOBD, 1.75 bpm at 5,212 psi, 6,310.0 6,368.0 22:00 00:00 diff=124, WHP=O, BHP=2,384, IA 0, OA 384 4/3/2018 4/3/2018 2.90 PROD4 DRILL DRLG P 6368 Drill, 1.75 bpm at 5,212 psi, 6,368.0 6,507.0 00:00 02:54 diff=124, WHP=O, BHP=2,384, IA 0, OA 384 4/3/2018 4/3/2018 0.10 PROD4 DRILL WPRT P BHA wiper, PUW=20K 6,507.0 6,507.0 02:54 03:00 4/3/2018 4/3/2018 2.50 PROD4 DRILL DRLG P 6507', Drill, 1.79 BPM @ 5380 PSI 6,507.0 6,614.0 03:00 05:30 FS, BHP=2403, RIW=1.1K, DHWOB=1.9K 4/3/2018 4/3/2018 0.50 PROD4 DRILL WPRT P 6614', Wiper to window with sweeps 6,614.0 5,225.0 05:30 06:00 4/3/2018 4/3/2018 0.10 PROD4 DRILL DLOG P Log Ra marker for +4 foot correction 5,225.0 5,245.0 06:00 06:06 4/3/2018 4/3/2018 0.50 PROD4 DRILL WPRT P Continue wiper back in hole, RIW=SK 5,245.0 6,618.0 06:06 06:36 4/3/2018 4/3/2018 6.60 PROD4 DRILL DRLG P 6618', Drill, 1.8 BPM @ 5594 PSI FS, 6,618.0 6,919.0 06:36 13:12 BHP=2398, No improvement on ROP, Gained 3-5K surface weight, 6660 ROP above 100 FPH. Continue to perform mini / BHA wipers as needed. ROP mostly in the 30's with faster periods @ 6664 and 6811. Pump sweeps 4/3/2018 4/3/2018 0.10 PROD4 DRILL WPRT P BHA wiper, PUW=20K, Tool against 6,919.0 6,916.0 13:12 13:18 stops 4/3/2018 4/3/2018 1.70 PROD4 DRILL DRLG P 6919', Drill, 1.78 BPM @ 5769 PSI 6,916.0 6,950.0 13:18 15:00 FS, BHP=2471 4/3/2018 4/3/2018 1.90 PROD4 DRILL TRIP T 6950, Start wiper decide to trip for 6,950.0 81.0 15:00 16:54 BHA inspection / poor drilling performance, PUW=20K, Test orienter @ 500', seems OK (put Baker on NPT at 6450') 4/3/2018 4/3/2018 1.70 PROD4 DRILL PULD T PJSM to PUD BHA, Tag up and space 81.0 0.0 16:54 18:36 out, motor injection port washed-out, bit came out 1-1 w/1 plugged nozzle Page 15/18 Report Printed: 4/19/2018 Iterations Summary (with TimelogRepths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 4/3/2018 4/3/2018 0.50 PROD4 DRILL RGRP T Notice hydraulic fluid on top of injector 0.0 0.0 18:36 19:06 cart, search for source, unresolved, will continue to monitor (remove this time from Baker NPT) 4/3/2018 4/3/2018 0.90 PROD4 DRILL PULD T PJSM, PD BHA #15 (new agitator, 0.0 78.0 19:06 20:00 1.0° AKO motor, Baker P104 cutters bit), slide in cart, check pack -offs, good, MU to coil, tag up 4/3/2018 4/3/2018 1.10 PROD4 DRILL TRIP T RIH with BHA #15, close EDC, 78.0 4,610.0 20:00 21:06 surface test agitator (@ 505', pumping 1.8 bpm, bore pressure = 1553 psi, dill pressure = 900 psi) 4/3/2018 4/3/2018 0.20 PROD4 DRILL DLOG T log K1 for-0.5' correction 4,610.0 4,632.0 21:06 21:18 4/3/2018 4/3/2018 0.70 PROD4 DRILL TRIP T Continue RIH (take Baker of NPT at 4,632.0 6,950.0 21:18 22:00 6450') 4/3/2018 4/4/2018 2.00 PROD4 DRILL DRLG P OBD pumping 1.8 bpm, CWT = 2K, 6,950.0 7,049.0 22:00 00:00 WOB = 1.8K, BHP = 2478 psi, open choke, FS = 1000 psi, bore pressure drop at -6983' (monitor), rate out began to drop to 1.45 bpm at-7015', continued to fall to 1.2 bpm when holding 10.8 ppg at window, confer with town, decision made to drill until rate out drops to 1 bpm (for 15 min), avg ROP = 50 fph 4/4/2018 4/4/2018 1.80 PROD4 DRILL DRLG P Drilling from 7040', rate in = 1.78 bpm, 7,049.0 7,088.0 00:00 01:48 rate out = 1.1 bpm, BHP = 2411 psi, WHP = 73 psi, CWT = 1 K, WOB = 1.6K, rate out drops to 1 bpm, pump 5x5 sweeps, rate out increases to 1.58 bpm by 7065', pump 5x5 sweeps 4/4/2018 4/4/2018 0.10 PROD4 DRILL WPRT P 100' wiper, PUW = 22K, RIW = 5K 7,088.0 7,088.0 01:48 01:54 4/4/2018 4/4/2018 3.10 PROD4 DRILL DRLG P OBD, FS = 992 psi, CWT = -2K, WOB 7,088.0 7,169.0 01:54 05:00 = 1.4K, BHP = 2438 psi, rate in = 1.75 bpm, rate out = 1.5 bpm, pumps 5x5 sweeps, avg ROP = 26 fph 4/4/2018 4/4/2018 0.50 PROD4 DRILL DRLG P Continue drilling from 7169', CWT = 7,169.0 7,201.0 05:00 05:30 OK, WOB = 1.3K, BHP = 2450 psi, 83% returns 4/4/2018 4/4/2018 0.10 PROD4 DRILL WPRT P BHA wiper, PUW=22K 7,201.0 7,201.0 05:30 05:36 4/4/2018 4/4/2018 3.90 PROD4 DRILL DRLG P 7201', Drill, 1.8 BPM @5431 PSI FS, 7,201.0 7,350.0 05:36 09:30 BHP=2351, Pump 25 BBIs beaded pill. Get back 4K surface weight 4/4/2018 4/4/2018 0.50 PROD4 DRILL WPRT P 7350, 800'wiper, PUW=21K 7,350.0 7,350.0 09:30 10:00 4/4/2018 4/4/2018 1.50 PROD4 DRILL DRLG P 7350', Drill, 1.80 BPM @ 5807 PSI 7,350.0 7,423.0 10:00 11:30 FS, BHP=2472 4/4/2018 4/4/2018 0.10 PROD4 DRILL WPRT P Pull off bottom to get tool off stops, 7,423.0 7,423.0 11:30 11:36 PUW=23K 4/4/2018 4/4/2018 3.40 PROD4 DRILL DRLG P 7423', Drill, 1.8 BPM @ 5807 PSI FS, 7,423.0 7,700.0 11:36 15:00 BHP=2466, perform BHA wipers as required. Returns holding 1.4 BPM 4/4/2018 4/4/2018 0.70 PROD4 DRILL WPRT P . 7700', call TD, PUH waiting on 7,700.0 7,700.0 15:00 15:42 sweeps Page 16118 Report Printed: 4/19/2018 qperations Summary (with Timelogtepths) CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (WS) End Depth (ftKB) 4/4/2018 4/4/2018 1.80 PROD4 DRILL TRIP P Pump sweeps out of coil, chase to 7,700.0 78.0 15:42 17:30 swab, PUW=22K 4/4/2018 4/4/2018 1.70 PROD4 DRILL PULD P PJSM, PUD BHA #15, pull checks, bit 78.0 0.0 17:30 19:12 cam out a 1-1 w/2 plugged nozzles 4/4/2018 4/4/2018 1.00 PROD4 WHDBOP CIRC P MU nozzle, circulate coil to fresh 0.0 0.0 19:12 20:12 water, jet stack, grease tree 4/4/2018 4/4/2018 1.80 PROD4 WHDBOP PRTS P Prep for and test inner reel valve & 0.0 0.0 20:12 22:00 stripper, grease valves, slide back cart, break off nozzle, clear floor, fluid pack lines 4/4/2018 4/4/2018 0.60 PROD4 WHDBOP PRTS T Shell test, difficulty holding high test, 0.0 0.0 22:00 22:36 leaking past Romeo 3 4/4/2018 4/4/2018 1.30 PROD4 WHDBOP BOPE T Test BOPE, 250 psi low / 3500 psi 0.0 0.0 22:36 23:54 high (Witnessed by AOGCC Adam Earl), bleed past swab 2 (test #1), regrease, good low test, bad high test, re -grease swab, good test 4/4/2018 4/5/2018 0.10 PROD4 WHDBOP BOPE P Continue BOPE test 0.0 23:54 00:00 4/5/2018 4/5/2018 1.90 PROD4 WHDBOP BOPE P Continue BOPE test 0.0 0.0 00:00 01:54 4/5/2018 4/5/2018 0.60 PROD4 WHDBOP BOPE T Difficulty holding low test on Test #8, 0.0 0.0 01:54 02:30 tracked to Romeo 2, grease & retest, good 4/5/2018 4/5/2018 2.50 PROD4 WHDBOP BOPE T Continue BOPE test, fail on Test #9 , 0.0 0.0 02:30 05:00 grease Romeo 3, no good, bleed off pressure, purged through WT valve on night cap to purge air, no good, close lower blinds, pressure up, good, grease stack, reteset, no good, appear to be Bravo 8 4/5/2018 4/5/2018 3.00 PROD4 WHDBOP BOPE P Continue BOPE test. No other failures, 0.0 0.0 05:00 08:00 test over @ 08:00 4/5/2018 4/5/2018 1.70 PROD4 DRILL CIRC P Instil floats in UQC, Instil nozzle. Stab 0.0 0.0 08:00 09:42 on well circ coil back to Duovis light, Blow down well control choke. Rack back injector. Blow down test pump 4/5/2018 4/5/2018 1.60 PROD4 DRILL PULD P PJSM, P/U BHA #16 with 1 ° motor, 0.0 68.7 09:42 11:18 agitator, and RR HYC bi center and pressure deploy. Check pack offs. Tag up and set counters 4/5/2018 4/5/2018 1.00 PROD4 DRILL TRIP P RIH, EDC open pumping min rate 68.7 5,189.0 11:18 12:18 4/5/2018 4/5/2018 0.20 PROD4 DRILL PRTS P Obtain static pressure, sesor @ 4076 5,189.0 5,189.0 12:18 12:30 TVD, Annlar pressure 2259 PSi and slowly dropping 4/5/2018 4/5/2018 0.10 PROD4 DRILL TRIP P Continue in well 5,189.0 5,225.0 12:30 12:36 4/5/2018 4/5/2018 0.20 PROD4 DRILL DLOG P Log RA tag for -1' 5,225.0 5,249.0 12:36 12:48 4/5/2018 4/5/2018 0.70 PROD4 DRILL TRIP P Continue in well, Set down @ 7125 5,249.0 7,701.0 12:48 13:30 not at correct TF. Pick up and go right through. Ratty condition 7400 to 7600 were hole close to top of zone. No setdown. 4/5/2018 4/5/2018 1.20 PROD4 DRILL WPRT P PUH circulating beaded 11.0 PPG 7,701.0 7,701.0 13:30 14:42 liner pill Page 17/18 Report Printed: 4/19/2018 " operations Summary r (with Timelog'Repths) m CD2-463 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 4/5/2018 4/5/2018 2.10 PROD4 DRILL, TRIP P POOH pumping beaded liner running 7,701.0 79.0 14:42 16:48 pill followed by 11.0 PPG completion fluid, Paint EOP flags @ 5140, & 2600 4/5/2018 4/5/2018 1.00 COMPZ4 CASING PULD P PJSM lay down BHA on dead well, 79.0 0.0 16:48 17:48 Flow check well 4/5/2018 4/5/2018 1 3.30 COMPZ4 CASING PUTB P PJSM, PU liner (non -ported bullnose, 0.0 2,512.0 17:48 21:06 81 jnts slotted, shorty deployment sleeve), filling hole as required (-15 bph) 4/5/2018 4/5/2018 0.90 COMPZ4 CASING PULD P PJSM, PU BHA #17 (liner running 2,512.0 2,556.0 21:06 22:00 tools), run coil down towards skate to callibarte Baker's new injector mounted depth counter, slide in cart, MU to coil, change out pack -offs, tag up, set counters 4/5/2018 4/6/2018 2.00 COMPZ4 CASING RUNL P RIH with L2-01 liner, adjust to window 2,556.0 7,366.0 22:00 00:00 flag for -4.3' correction, PUW @ window = 71 K , a bit ratty beginning at 7092', begin working pipe significantly at-7230', 4/6/2018 4/6/2018 0.80 COMPZ4 CASING RUNL P Continue working liner to bottom, 7,366.0 7,701.0 00:00 00:48 arrive at setting depth, bring up pump, release off liiner, putting BOL = 7701', TOL = 5189' 4/6/2018 4/6/2018 0.90 COMPZ4 CASING DLOG P Obtain SBHP, (MD sensor = 5116.39', 7,701.0 5,165.0 00:48 01:42 TVD sensor = 4076.24', annular = 2239 psi, EMW = 10.57), Note: depth change is subracting liner length (pipe was not moved during SBHP at 5165', continue test time past 30 min while continuing to off load seawater to rig, work to calibrate new Baker depth counter, PJSM with LRS for freeze protect 4/6/2018 4/6/2018 1.80 DEMOB WELLPR DISP P Circulate well to seawater, continue to 5,165.0 2,500.0 01:42 03:30 calibrate new depth counter 4/6/2018 4/6/2018 1.50 DEMOB WELLPR DISP P Diesel freeze protect from 2500' to 2,500.0 38.0 03:30 05:00 surface, tag up, space out, blow down TT line 4/6/2018 4/6/2018 1.30 DEMOB WELLPR PULD P PJSM, PUD BHA #17, SITP = 540 psi 38.0 0.0 05:00 06:18 4/6/2018 4/6/2018 0.70 DEMOB WELLPR WWWH P Remove checks, Install Nozzle, Stab 0.0 0.0 06:18 07:00 on well, jet stack and tree 4/6/2018 4/6/2018 1.50 DEMOB WHDBOP WWSP P PJSM, R/U and set BPV, Rig down 0.0 0.0 07:00 08:30 lubricator 4/6/2018 4/6/2018 1.00 DEMOB MOVE RURD P Flush and blow down rig surface lines 0.0 0.0 08:30 09:30 and drilling choke 4/6/2018 4/6/2018 1.00 DEMOB WHDBOP BOPE P Run bore scope through bop stack, 0.0 0.0 09:30 10:30 freeze protect tree with 5 gal. methonal 4/6/2018 4/6/2018 1.00 DEMOB WHDBOP CTOP P Check tree bolts, check BOPE stack 0.0 0.0 10:30 11:30 bolts 4/6/2018 4/6/2018 3.00 DEMOB MOVE RURD P Start working rig down check list, Off 0.0 0.0 11:30 14:30 load pits, Blow down steam 4/6/2018 4/6/2018 1.50 DEMOB WHDBOP NUND P Nipple down stack, Release rig @ 0.0 0.0 14:30 16:00 16:00 Page 18/18 Report Printed: 4/19/2018 • 0 ConocoPhillips ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD2 Alpine Pad CD2-463L2-01 50-103-20577-63 Baker Hughes INTEQ Definitive Survey Report 07 May, 2018 BA ER F�UGHES a GEcompany 0 • ,. ConocoPhillips ConocoPhillips Definitive Survey Report h Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CO2-463 Project: Western North Slope TVD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad MD Reference: CD2-463 @ 53.03usft (Doyon 19) ' Well: CD2-463 North Reference: True Wellbore: CD2-463 Survey Calculation Method: Minimum Curvature Design: CD2463 Database: EDT Alaska Sandbox Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact salution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD2-463 Well Position +NI-S 0.00 usft Northing: 5,974,176.62usft +El-W 0.00 usft Easting: 371,429.10ush Position Uncertainty 0.00 usft Wellhead Elevation: usft Wellbore CD24631-2-01 BAER WHFS Latitude: 70' 20' 15.607 N Longitude: 151' 2' 35.652 W Ground Level: 15.70 usft Magnetics Model Name Sample Date Declination Dip Angle Field Strength V) 11 (nT) BGGM2017 2/1/2018 16.84 80.81 57,444 Design CD24631-2-01 Audit Notes: Version: 1.0 Phase: ACTUAL The On Depth: 5,386.41 Vertical Section: Depth From (TVO) +Nl-5 +EI-W Direction (usft) (usft) (usft) (') 37.33 0.00 0.00 90.00 51712018 12:09: 51PM Page 2 COMPASS 5000. 14 Build 85 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD2-463 Project: Western North Slope TVD Reference: CD2463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad MD Reference: CD2.463 @ 53.03usft (Doyon 19) Well: CD2-463 North Reference: True Wellbore: CD2463 Survey Calculation Method: Minimum Curvature Design: CD2-463 Database: EDT Alaska Sandbox Survey Program Date 4/5/2018 From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 81.00 447.00 CD2463 Gyro (CD2-463) CB -GYRO -SS Camera based gyro single shot 7/3/2008 7/3/2008 474.54 5,193.14 CD2-463 MWD+SAG+CA+IIFR+MS(CD MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 7/3/2008 7/15/2008 5,206.00 5,356.01 CD2-463L2 MWD-INC (CD24631-2) MWD-INC-ONLY (INC>10°) MWD-INC-ONLY-FILLER ( INC>10°) 3/30/2018 3/30/2018 {{ 5,386.41 5,386.41 CD24631-2 MWD(CD2.463L2) MWD MWD-Standard 3/30/2018 3/31/2018 5,413.00 5,413.00 CD2-4631-2-01 MWD-INC (CD24631-2-0 MWD-INC-ONLY (INC>10") MWD-INC-ONLY-FILLER (INC>10-) 4/1/2018 4/1/2018 g 5,440.73 7,660.88 CD24631-2-01 MWD(CD2463L2-01) MWD MWD-Standard 4/l/2018 4/4/2018 .-..M.„, .... ,............. swvw Map Map Vertical MD Inc Aal TVD TVDSS +NiS +EI-W DLS NotEasting Section Survey Tool Name Annotation (usft) (°) (°) (usft) (usft) (usft) (usft) ft�) (tt) (°/100') (ft) 5,386.41 92.58 332.51 4,086.88 4,033.85 1,752.87 1,573.28 5,975,902.12 373,032.07 18.11 1,573.28 MWD(4) TIP 5,413.00 92.69 328.03 4,085.66 4,032.63 1,775.93 1,560.11 5,975,925.40 373,019.30 16.84 1,560.11 MWD-INC_ONLY (INC>10-) (5) KOP 5.440.73 96.40 330.63 4,083.46 4,030A3 1,799.70 1,546.01 5,975,949.40 373,005.62 16.32 1.546.01 MWD (6) 5,471.14 97.80 336.77 4,079.70 4,026.67 1,826.74 1,532.65 5,975,976.66 372,992.72 20.56 1,532.65 MWD (6) 5,499.95 96.94 340.44 4,076.01 4,022.98 1,853.33 1,522.23 5,976.003.43 372,982.75 12.98 1,522.23 MWD (6) 5,531.72 94.46 345.26 4,072.85 4,019.82 1,883.53 1,512.91 5,976.033.78 372,973.96 16.99 1,512.91 MWD (6) 5,559.54 92.83 349.92 4,071.08 4,018.05 1,910.64 1,506.95 5,976,060.99 372,968.46 17.71 1,506.95 MWD(6) 5,589.55 90.86 352.42 4,070.11 4,017.08 1,940.27 1,502.34 5,976,090.69 372,964.37 10.60 1,502.34 MWD (6) 5,620.75 89.02 355.58 4,070.15 4,017.12 1,971.30 1,499.08 5,976,121.77 372,961.64 11.72 1,499.08 MWO(6) 5,651.03 87.67 358.94 4,071.02 4,017.99 2,001.53 1,497.64 5,976.152.01 372,960.71 11.95 1,497.64 MWD (6) 5,680.59 90.89 4.90 4,071.39 4,018.36 2,031.05 1,498.63 5,976,181.51 372,962.21 22.91 1,498.63 MWD (6) 5,711.06 89.66 8.42 4,071.25 4,018.22 2,061.31 1,502.16 5,976,211.70 372,966.25 12.24 1,502.16 MWD (6) 5,740.81 89.79 13.80 4,071.39 4,018.36 2,090A9 1,507.89 5,976,240.78 372,972.49 18.09 1,507.89 MWD (6) 5,771.19 89.48 17.82 4,071.58 4,018.55 2,119.71 1,516.17 5,976,269.86 372,981.26 13.27 1,516.17 MWD(6) 5,800.03 89.51 22.11 4,071.04 4,018.81 2,146.81 1,526.01 5,976,296.78 372,991.57 14.87 1,526.01 MWD (6) Interpolated Azimuth 5,830.08 89.79 26.58 4,072.02 4,018.99 2,174.18 1,538.39 5,976,323.93 373,004.42 14.90 1,538.39 MWD (6) 5,860.46 89.82 31.33 4,072.12 4,019.09 2,200.76 1,553.10 5,976,350.25 373,019.57 15.64 1,553.10 MWD(6) 5,891.34 89.42 35.68 4,072.33 4,019.30 2,226.50 1,570.14 5,976,375.69 373,037.05 14.15 1,570.14 MWD(6) 5/72018 12:09: 51PM Page 3 COMPASS 5000.14 Build 85 Ll ConocoPhillips ColocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Project: Western North Slope TVD Reference: Site: CD2 Alpine Pad MD Reference: Well: CD2463 North Reference: Wellbore: CD2463 Survey Calculation Method: Design: CD2-463 Database: Survey Well CD2-463 CD2463 @ 53.03usf1 (Doyon 19) CD2463 @ 53.03usft (Doyon 19) True Minimum Curvature EDT Alaska Sandbox �UGXES Map Map Vertical MD Inc AZI TVD TVDSS +NlS +E/4N Northing Eastfng DLS Section Survey Tool Name Annotation (usn) 11 (°) lusn) (usn) (usn) (usn) (n) (n) (°1100.) (n) 5,921.03 89.32 40.43 4,072.65 4,019.62 2,249.87 1,588.43 5,976,398.74 373,055.75 16.00 1,588.43 MWD (6) 5,950.27 87.67 44.68 4,073.42 4,020.39 2,271.40 1,608.20 5,976,419.93 373,075.87 15.59 1,608.20 MWD (6) 5,980.30 89.75 49.89 4,074.10 4,021.07 2,291.75 1,630.25 5,976,439.90 373,098.27 18.68 1,630.25 MWD (6) 6,011.79 88.37 51.88 4,074.62 4,021.59 2,311.62 1,654.67 5,976.459.34 373,123.03 7.69 1,654.67 AVID (6) 6,041.31 87.08 55.69 4,075.79 4,022.76 2,329.04 1,678.47 5,976,476.35 373,147.11 13.62 1,678.47 MWD(6) 6,070.97 86.62 59.28 4,077.42 4,024.39 2,344.96 1,703.44 5,976,491.84 373,172.35 12.18 1,703.44 MWD (6) 6,101.07 90.28 61.98 4,078.23 4,025.20 2,359.71 1,729.65 5,876,506.14 373,198.81 15.11 1,729.65 MWD (6) 9 6,130.86 88.80 64.88 4,078.47 4,025.44 2,373.03 1,756.29 5,976,519.00 373,225.67 10.93 1,756.29 MWD (6) S 6,160.97 89.32 68.43 4,078.97 4,025.94 2,394.96 1,783.93 5,976,530.45 373,253.51 11.91 1,783.93 MWD(6) S ( 6,190.29 88.04 71.80 4,079.64 4,026.61 2,394.93 1,811A9 5,976,539.94 373,281.23 12.29 1,811.49 MWD (6) 6,220.86 87.61 75.61 4.080.80 4,027.77 2,403.50 1,840.80 5,976,548.01 373,310.69 12.53 1,840.80 MWD (6) 6,250.95 88.74 79.08 4,081.76 4,028.73 2,410.09 1,870.14 5,976,554.09 373,340.14 12.12 1,870.14 MWD (6) 6,280.37 88.80 83.43 4,082.39 4,029.36 2,414.56 1,899.21 5,976,558.06 373,369.27 14.78 1,899.21 MWD (6) 6,310.49 89.05 87.90 4,082.96 4,029.93 2,416.83 1,929.23 5,976,559.82 373,399.32 14.86 1,929.23 MWD (6) 6,340.48 90.95 91.89 4,082.96 4,029.93 2,416.89 1,959.21 5,976.559.37 373,429.30 14.74 1,959.21 MWD(6) 6,370.73 89.48 95.11 4,082.84 4,029.81 2,415.04 1,989.40 5,976,557.00 373,459.45 11.70 1,989.40 MWD (6) 66 6,400.96 0 90.40 99.33 4,082.88 4,029.85 2,411.24 2,019.38 5,976,552.69 373,489.36 14.29 2,019.38 MWD(6) y { 6,430.39 90.95 102.72 4,082.53 4,029.50 2,405.61 2,048.26 5,976,546.57 373,518.14 11.67 2,048.26 MWD (6) 6,460.48 92.83 105.80 4,081.54 4,028.51 2,398.21 2,077.40 5,976,538.67 373,547.15 11.99 2,077.40 MWD (6) 6,490.62 93.75 110.54 4,079.81 4,026.78 2,388.83 2,105.99 5,976,528.80 373,575.56 15.99 2,105.99 MWD (6) 6,520.53 92.46 113.51 4,078.19 4,025.16 2,377.63 2,133.67 5,976,517.13 373,603.05 10.81 2,133.67 MWD (6) 6,550.43 90.68 116.32 4,077.37 4,024.34 2,365.04 2,160.77 5,976,504.07 373,629.93 11.12 2,160.77 MWD (6) 6,580.57 90.52 118.42 4,077.05 4,024.02 2,351.19 2,187.53 5,976,489.76 373,656.45 6.99 2,187.53 MWD (6) 6,610.38 89.63 114A8 4,077.01 4,023.98 2,337.98 2,214.25 5,976,476.10 373,682.93 14.53 2,214.25 MWD (6) ((( 6,641.23 19,81 110,84 4,071.11 4,024.12 2,326.17 2,242,75 1,1711,463.81 373,711,22 11,85 2*242,75 MWD (6) 6,671.24 09.54 108.43 4,077.31 4,024.28 2,316.09 2,271.01 5,976,453.24 373,739.30 8.10 2,271.01 MWD (6) 6,701.15 90.34 105.11 4,077.34 4,024.31 2,307.46 2,299.64 5,976,444.13 373,767.78 11.42 2,299.64 MWD(6) 6,731.15 89.54 100.61 4,077.37 4,024.34 2,300.78 2,328.88 5,976,436.95 373,796.90 15.24 2,328.88 MWD (6) 6,761.67 91.14 96.79 4,077.19 4,024.16 2,296.17 2,359.05 5,976,431.82 373,825.97 13.57 2,359.05 MWD (6) 6,790.74 90.00 92.57 4,076.90 4,023.87 2,293.80 2,388.01 5,976,428.95 373,855.89 15.04 2,388.01 MWD (6) 6,821.48 90.37 89.17 4,076.80 4,023.77 2.293.33 2,418.74 5,976,427.96 373,886.61 11.13 2.418.74 MWD (6) 5/72018 12: 09.51PM Pape 4 COMPASS 5000. 14 Build 65 9 0 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips(Alaska) Inc. -WNS Local Co-ordinate Reference: Well CD2-463 Project: Western North Slope TVD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad MD Reference: CD2-463 @ 53.03usft (Doyon 19) Well: CD2-463 North Reference: True g Wellbore: CD2r463 Survey Calculation Method: Minimum Curvature " I Design: CD2-463 Database: EDT Alaska Sandbox Survey Map Map vertical MD Inc Azi TVD TVDSS +N/S +EI-W Northing Easting DLS Section SurveyTool Name Annotation (usft) (^) 1^) (usft) (usft) (usft) (usft) (ft) (ft) ("1100-) (ft) 6,850.36 92.24 85.41 4,076.15 4,023.12 2,294.70 2,447.58 5,976,428.83 373,915.46 14.54 2,447.58 MWD (6) 6,880.38 92.76 83.51 4,074.84 4,021.81 2,297.59 2,477.43 5,976,431.21 373,945.35 6.56 2,477.43 MWD (6) 6,909.17 93.97 66.65 4,073.15 4,020.12 2,300.06 2,506.06 5,976,433.19 373,974.02 11.67 2,506.06 MWD (6) 6,940.69 92.46 89.24 4,071.38 4,018.35 2,301.18 2,537.50 5,976,433.77 374,005.48 9.50 2,537.50 MWD (6) 6,971.54 89.48 93.56 4,070.86 4,017.83 2,300.43 2,568.33 5,976,432.49 374,036.28 17.01 2,568.33 MWD (6) 7,000.80 92.73 98.79 4,070.29 4,017.26 2,297.28 2,597.40 5,976,428.85 374,065.29 21.04 2,597.40 MWD (6) 7,030.30 92.09 103.08 4,069.05 4,016.02 2,291.69 2,626.33 5,976,422.76 374,094.12 14.69 2,626.33 MWD (6) p 7,060.13 91.26 108.16 4,068.18 4,015.15 2,283.67 2,655.04 5,976,414.25 374,122.68 17.25 2,655.04 MWD (6) 7,090.53 90A9 111.42 4,067.71 4,014.68 2,273.38 2,683.63 5,976,403.47 374,151.10 11.02 2,683.63 MWD (6) 7,120.24 92.64 115.56 4,066.90 4,013.87 2,261.54 2,710.86 5,976,391.17 374,178.12 15.70 2,710.86 MWD (6) 7,151.28 88.89 117.60 4,066.49 4,013.46 2,247.66 2,738.61 5,976,376.82 374,205.63 13.75 2,738.61 MWD (6) 7,180.13 86.34 119.61 4,067.69 4,014.66 2,233.86 2,763.92 5,976,362.59 374,230.69 11.25 2,763.92 MWD (6) 7,210.80 88.89 120.46 4,068.96 4,015.93 2,218.53 2,790.44 5,976,346.80 374,256.94 8.76 2,790.44 MWD (6) 7,240.56 88.19 118.19 4,069.72 4,016.69 2,203.96 2,816.38 5,976,331.79 374,282.62 7.98 2,816.38 MWD (6) 7,270.91 87.33 116.08 4,070.91 4,017.88 2,190.12 2,843.37 5,976,317.50 374,309.37 7.50 2,843.37 MWD (6) 7,300.79 87.51 114.47 4,072.25 4,019.22 2,177.38 2,870.36 5,976,304.29 374.336.13 5.42 2,870.36 MWD (6) 7,331.58 88.25 110.65 4,073.39 4,020.36 2,165.58 2,898.77 5,976,292.01 374,364.33 12.63 2,898.77 MWD (6) 7,360.99 88.83 107.26 4,074.14 4,021.11 2,156.03 2,926.57 5,976,281.98 374,391.97 11.69 2,926.57 MWD (6) 7,390.73 89.79 103.86 4,074.50 4,021.47 2,148.05 2,955.21 5,976,273.52 374.420.47 11.88 2,955.21 MWO(6) 7,42D.93 88.37 100.94 4,074.99 4,021.96 2,141.57 2,984.70 5,976,256.53 374,449.84 10.75 2,984.70 MWD(6) 7,450.75 90.40 99.33 4,075.31 4,022.28 2,136.32 3,014.05 5,976,260.78 374,479.09 8.69 3,014.05 MWD (6) 7,481.61 89.51 94.72 4,075.33 4,022.30 2,132.55 3,044.67 5,976,256.49 374,509.64 15.21 3,044.67 MWD (6) 7,510.37 89.20 90.66 4,075.65 4,022.62 2,131.20 3,073.39 5,976,254.64 374,538.33 14.16 3,073.39 MWD (6) 7,541.81 90.67 87.38 4,075.69 4,022.66 2,131.74 3,104.82 5,976,254.64 374,569.76 11.43 3,104.82 MWD (6) 7,570.47 89.66 84.01 4,075.61 4,022.58 2,133.89 3,133.40 5,976,256.30 374,598.37 12.28 3,133.40 MWD (6) 7,601.04 90.18 81.02 4,075.65 4,022.62 2,137.87 3,163.70 5,976,259.76 374,628.73 9.93 3,163.70 MWD (6) 7,631.32 89.20 79.99 4,075.81 4,022.78 2,142.87 3,193.57 5,976,264.25 374,658.68 4.70 3,193.57 MWD (6) 7,660.88 86.56 77.81 4,076.91 4,023.88 2,148.55 3,222.55 5,976.269.43 374,687.75 11.58 3,222.55 MWD (6) 7,701.00 86.56 77.81 4,079.32 4,026.29 2,157.01 3,261.69 5,976,277.22 374,727.03 0.00 3,261.69 PROJECTED to TD &72018 12:09:51PM Page 5 COMPASS 5000. 14 Build 85 BER PRINT GHES TGE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME CD2-463L2-01 FIELD Colville River 46 DISTRIBUTION LIST 21 6026 29 23 5 Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp (WNS Petroleum Technician) 700 G Street. Anchorage, Alaska 99510 to acknowledge receipt of this data. COUNTY North Slope Borough LOG TYPE BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(a)bakerhughes.corn STATUS Final Replacement COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 No GR - RES LOG DATE April5, 2018 TODAYS DATE May 7, 2018 MAY 0 9 2018 Revision Details: A ��('+� Rev. Requested by: FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES 1# OF COPIES 0 0 0 0 0 01 01 0 101 0 3 ExxonMobil, Alaska 0 0 0 0 0 Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOtl & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 * Stamp "confidential" on all material de 6 BP Exploration (Alaska) Inca Petrotechnical Data Center, LR24 900 E. Benson Blvd. !Anchorage, Alaska 99508 0 1 1 1 1 1 0 1 0 TOTALS FOR THIS PAGE: 0 1 3 0 THE STATE ��1►�.'f:I1 GOVERNOR BILL WALKER James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O Box 100360 Anchorage, AK 9510-0360 2 Alaska Oil and Gas Conservation Commission Re: Colville River Field, Qannik Oil Pool, CRU CD2-463L2-01 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-026 Surface Location: 2185' FNL, 1805' FEL, Sec. 2, T11N, R4E, UM Bottomhole Location: 46' FNL, 3833' FEL, Sec. 1, T11N, R4E, UM Dear Mr. Ohlinger: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 208-107, API No. 50-103- 20577-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair DATED this �� day of March, 2018. STATE OF ALASKA r ALASKA OIL AND GAS CONSERVATION COMMISSION FEB 2 7 PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: 1 b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Speci i we I is propose for: Drill ❑ Lateral - ❑� Stratigraphic Test ❑ Development - Oil 0 Service - Winj ❑ Single Zone ❑✓ Coalbed Gas ❑ Gas Hydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑ - Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No. 5952180 + CRU CD24631-2-01 ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: % 7700 TVD: 4021 Colville River Field / 4a. Location of Well (Governmental Section): 7. Property Designation: M Surface: 2185' FNL, 1805' FEL, Sec. 2, T11N, R4E, U ADL 380075, ADL 025530 ,3�pp Qannik Oil PoolM , Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 611' FNL, 182' FEL, Sec. 2, T11 N, R4E, UM LONS 97-007 3/15/2018 Total Depth: 9. Acres in Propertv: 2� �� 14. Distance to Nearest Property: 46' FNL, 3833' FEL, Sec. 1, T11N, R4E, UM _@. 3850' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 53' 15. Distance to Nearest Well Open Surface: x- 371429 y- 5974177 Zone- 4 GL / BF Elevation above MSL (ft): 16' to Same Pool: 652', CD2-13 16. Deviated wells: Kickoff depth: 5400 feet • 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 98 degrees . Downhole: 2550 Surface: 2148 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST-L 2505' 5195' 4018' 7700' 4021' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 10877' 4088' None 10877' 4088' N/A Casing Length Size Cement Volume MD TVD Conductor 114' 16" Portland Type III 114' 114' Surface 2615' 9-5/8" 585 sx ASL3, 270 sx Class G 2615' 2377' Intermediate 5149' 7-5/8" 255 sx Class G 5149' 4076' Production Liner 5050' 3-1/2" Slotted 10877' 4088' Perforation Depth MD (ft): Slotted liner: 5027' - 10877' Perforation Depth TVD (ft): 4063' - 4088' Hydraulic Fracture planned? Yes ❑ No ❑✓ 20. Attachments: Property Plat ❑ BOP Sketch Diverter Sketch Drilling Program Time v. Depth Plot ❑ Seabed Report ❑ Drilling Fluid Program ❑✓ Shallow Hazard Analysis 20 AAC 25.050 requirements ❑ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Mike Callahan %lit! Authorized Name: James Ohlinger Contact Email: Mike. Callahan c0 .com Authorized Title: Staff CTD Engineer Contact Phone: 907-263-4180 Authorized Signature: Date: 44119 0-11 Commission Use Only Permit to Drill 150- API Number: — Permit Approval See cover letter for other Number: p2 (3 —0Q Date: Vola requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other: Mud to ❑ No[V7 re d: Yes o SD/� fiCvt to 3 j 00 fo5Samples req'd: Yes i,q/ 9 q' ❑ Yes Ed No ❑] Z SL022S1mea suures: Directional svy req'd: Yes [vNo ❑ �G r/�� �Y / Spac' exception r'eq'd: Yes ❑ No U✓ Inclination -only svy req'd: Yes ElNo [iT e Z ✓ 5 J f Post initial injection MIT req'd: Yes ❑ No 15 g1-4Y7 tt-d j-o gJ10W thz k/ �_-k� any Por`nJ' cGlr7h z fJaVl01�fl- J APPROVED BY Approved by: 3 II COMMISSIONER THE COMMISSION Date: V A S / %� / .S ` Submit Form and Form 10-401 Revise /2017 i permit is val' h tttf approval per 20 AAC 25.005(g) Attachments in Duplicate 'IN I UIrdkn ConocoPhillips p Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 February 26, 2018 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the Colville River .Unit CD2-463 (PTD# 208-107) using the coiled tubing drilling rig, Nabors CDR3-AC. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. CTD operations are scheduled to begin in March 2018. The objective will be to drill laterals CRU CD2-463L1, CD2-4631_1-01, CD2-463L2, and CD24631-2-01 targeting the Qannik formation. Attached to this application are the following documents: — Permit to Drill Application Forms (10-401) for CD2-4631_1, 1-1-01, L2, & 1-2-01 — Detailed Summary of Operations — Directional Plans for CD2-463 laterals — Current wellbore schematic — Proposed wellbore schematic If you have any questions or require additional information, please contact me at 907-263-4180. Sincerely, Mike Callahan Coiled Tubing Drilling Engineer ConocoPhillips Alaska 0 • Alpine CTD Laterals CD24631-1, 1-1-01, 1-21 & 1-2-01 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))................................................................................................................... 2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................................. 2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3))................................................................................................................................................. 2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4))................................................................................................................................................. 2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5)).................................................................................................................................................. 2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6)).................................................................................................................................................. 3 7. Diverter System Information.......................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(7)).................................................................................................................................................. 3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8)).................................................................................................................................................. 3 9. Abnormally Pressured Formation Information............................................................................. 4 (Requirements of 20 AAC 25.005(c)(9)).................................................................................................................................................. 4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................ 4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................ 4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program............................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................ 4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................6 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))...................................................................................................................................................... 6 16. Attachments.................................................................................................................................... 6 Attachment 1: Directional Plans for CD2-4631-1, L1-01, L2, & 1-2-01 laterals..................................................................6 Attachment 2: Current Well Schematic for CD2-463.......................................................................................................6 Attachment 3: Proposed Well Schematic for CD2-4631-1, L1-01, L2, & 1-2-01 laterals....................................................6 Page 1 of 6 February 26, 2018 0 0 PTD Application: CD2-463L1, L1-01, L2, & L2-01 1. Well Name and Classification (Requirements of 20 AAC 25.005(t) and 20 AAC 25.005(b)) The proposed laterals described in this document are CD24631-1, 1-1-01, L2, & 1-2-01. All laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the Qannik Reservoir. See attached 10-401 form for surface and subsurface coordinates of the CD2-4631-1, 1-1-01, L2, & 1-2-01. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the maximum formation pressure in the area of 2550 psi, the maximum potential surface pressure in CD2- 463, assuming a gas gradient of 0.1 psi/ft, would be 2,148 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in CD2-463 was measured to be 1135 psi (5.5 ppg EMW) in 2016. The maximum downhole pressure in the CD2-463 vicinity is expected to be approximately 2550 psi (12.2 ppg). Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) The offset injection wells to CD2-463 have had no injected gas, so there is no possibility of encountering free gas while drilling the CD2-463 laterals. If significant gas is detected in the returns, the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the C2D-463 laterals will be shale instability across faults. Managed pressure drilling (MPD) may be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The CD2-463 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 February 26, 2018 0 PTD Application: CD2-463L1, L1-01, L2, & L2-01 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top MD Liner Btm MD Liner Top TVDSS Liner Btm TVDSS Liner Details C132-4631-1 8705' 10800, 4041' 4026' Slotted Liner CD2-463L1-01 8625' 10650' 4039' 3993' Slotted Liner CD2-463L2 5400' 1 7650' 4048' 4020' Slotted Liner C132-4631-2-01 5195' 1 7700' 4018' 4021' Slotted Liner Existing Casing/Liner Information Category OD Weight (p f) Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 65 H-40 Welded Surface 114' Surface 114' NA NA Surface 10-3/4" 45.5 L-80 BTC-MOD Surface 2615' Surface 2377' 3520 2020 Intermediate 7-5/8" 29.7 L-80 BTC-MOD Surface 5149' Surface 4076' 7240 5410 Tubing 3-1/2" 9.3 L-80 EUE-M Surface 5049' Surface 4066' 8440 6680 Liner 3-1/2" 9.3 L-80 SLHT 5027' 10877' Surface 4088' 8440 6680 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based FloPro mud (8.6 ppg) — 'Drilling operations: Chloride -based FloPro mud (8.6 ppg). This mud weight may hydrostatically overbalance the maximum reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid to provide formation over -balance and well bore stability while running completions. Managed Pressure Drilling Practice If returns can be established, managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the CD2-463 laterals we will target a constant return rate equal to the circulating flow rate. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Page 3 of 6 February 26, 2018 • PTD Application: CD2-4631-1, 1-1-01, L2, & 1-2-01 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background CD2-463 is an Alpine Qannik-sand producer equipped with 3-1/2" tubing and 3-1/2" slotted production liner. The CTD sidetrack will utilize four laterals out of the slotted liner to increase production in the area. Prior to CTD operations the XN nipple at 4,668' RKB has been milled out. Nabors CDR-3 will set a whipstock in the slotted liner at 8625' to drill the L1 and L1-01 laterals. After completion of the first two laterals, a second whipstock will be set at 5200' to drill the L2 and L2-01 laterals. All four laterals are planned within Qannik formation and will be completed with 2-3/8" slotted liner. Pre-CTD Work 1. RU Slickline: Obtain SBHP 2. RU Service Coil: Mill out HES XN-nipple at 4,668' RKB to 2.80" ID. RIH and cleanout fill to 8700' RKB. 3. Prep site for Nabors CDR3-AC. Page 4 of 6 February 26, 2018 • 0 PTD Application: CD2-463L1, L1-01, L2, & 1_2-01 Rig Work 1. MIRU Nabors CDR3-AC rig using 2-3/8" coil tubing. NU 7-1/16" BOPE, test. 2. Set 1 st whipstock in CD2-463 liner. Mill 2.80" window at 8,625' MD. 3. CD2-4631_1 Lateral (East 1st Lateral) a. Drill 3" bi-center lateral to TD of 10,800' MD. b. Run 2-3/8" slotted liner with an aluminum billet from TD up to 8,705' MD. 4. CD2-4631_1-01 Lateral (West 1 st Lateral) a. Kick off of the aluminum billet at 8,705' MD b. Drill 3" bi-center lateral to TD of 10,650' MD. c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 8,620' MD 5. Set 2nd whipstock in CD2-463 liner. Mill 2.80" window at 5,200' MD. 6. CD2-463L2 Lateral (West 2"d Lateral) a. Drill 3" bi-center lateral to TD of 7,650' MD. b. Run 2-3/8" slotted liner with an aluminum billet from TD up to 5,400' MD. 7. CD2-463L2-01 Lateral (East 2nd Lateral) a. Kick off of the aluminum billet at 5,400' MD b. Drill 3" bi-center lateral to TD of 7,700' MD. c. Run 2-3/8" slotted liner with a deployment sleeve from TD up to 5,195' MD. 8. Freeze protect, ND BOPE, and RDMO Nabors CRD3-AC. Post -Rig Work 1. Obtain SBHP. 2. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check and double ball valves in the BHA, and a slick -line lubricator. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. — Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. — When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. — The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Page 5 of 6 February 26, 2018 0 0 PTD Application: C132-4631-1, L1-01, L2, & 1-2-01 Liner Running — The CD2-463 laterals will be displaced to an overbalancing fluid (11.8 ppg NaBr) prior to running liner. See "Drilling Fluids" section for more details. — While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the Alpine Waste Injection Facility for grind and inject disposal. • Incidental fluids generated from drilling operations will also be injected at the Alpine Waste Injection Facility in disposal well (CD1-01A) or trucked to Kuparuk 1 B disposal facilities if the Alpine facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Alpine Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) — The Applicant is the only affected owner. — Please see Attachment 1: Directional Plans — Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. — MWD directional, resistivity, and gamma ray will be run over the entire open hole section. — Distance to Nearest Property Line (Measured to ADL387207 at the closest point.) Lateral Name Distance; CD2-463L1 4500' CD2-463L1-01 6050' CD2-463L2 5500' CD2-463L2-01 3850' — Distance to Nearest Well within Pool Lateral Name Distance Well C132-46311-1 825' CD2-10 C132-463L1-01 555' CD2-465 CD2-463L2 761' CD2-14 CD2-463L2-01 652' CD2-13 16. Attachments Attachment 1: Directional Plans for CD2-463L1, L1-01, L2, & L2-01 laterals Attachment 2: Current Well Schematic for CD2-463 Attachment 3: Proposed Well Schematic for CD2-463L1, L1-01, L2, & L2-01 laterals Page 6 of 6 February 26, 2018 0 ConocoPhillips ConocoPhillips(Alaska) Inc. MNS Western North Slope CD2 Alpine Pad CD2-463 CD2-463L1 Plan: CD2-463L1 wp03 Standard Planning Report 01 November, 2017 BER BA 0 GE company i 0 ConocoPhillips BAT BA_ KER ConocoPhillips Planning Report IGHES GE company Database: EDTAlaska Sandbox Local Co-ordinate Reference: Well CD2-463 Company: Conocoftllips(Alaska) Inc. -WNS TVD Reference: Mean Sea Level Project: Western North Slope MD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad North Reference: True Well: CD2-463 Survey Calculation Method: Minimum Curvature Wellbore: CD2-4631-1 Design: CD2-463L1_wp03 Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD2 Alpine Pad Site Position: Northing: 5,974,641.66 usft Latitude: 70° 20' 20.225 N From: Map Easting: 371,696.24usft Longitude: 151' 2' 28.083 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: -0.98 ° Well CD2-463 Well Position +N/-S 0.00 usft Northing: 5,974,176.62 usft Latitude: 70' 20' 15.607 N +E/-W 0.00 usft Easting: 371,429.10 usft Longitude: 151' 2' 35.652 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 15.70 usft Wellbore CD2-4631-1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (') (1 (nT) BGGM2017 2/1/2018 16.84 80.81 57,444 Design CD2-463L1_wp03 Audit Notes: Version: Phase: PLAN Tie On Depth: 8,529.01 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (I -15.70 0.00 0.00 60.00 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (usft) (I V) (usft) (usft) (usft) (°/100ft) (°/100ft) (°1100ft) V) Target 8,529.01 90.16 348.74 4,036.16 4,850.04 1,058.85 0.00 0.00 0.00 0.00 8,624.53 89.97 346.66 4,036.06 4,943.37 1,038.50 2.19 -0.20 -2.18 -95.22 8,645.53 87.03 346.66 4,036.60 4,963.79 1,033.66 14.00 -14.OD 0.00 180.00 8,675.53 85.55 348,15 4,038.55 4,993.00 1,027.13 7.00 -4.95 4.96 135.00 8,705.53 85.55 350.26 4,040.88 5,022.38 1,021.52 7.00 0.01 7.02 90.00 8,735.53 86.60 352.08 4,042.93 5,051.96 1,016.93 7.00 3.51 6.07 60.00 8,975.00 92.39 7.82 4,045.05 5,290.56 1,016.72 7.00 2.42 6.57 70.00 9,250.00 91.60 27.06 4.035.39 5,551.52 1,098.71 7.00 -0.29 7.00 92.00 9,450.00 89.86 40.96 4,032.83 5,716.89 1,210.29 7.00 -0.87 6.95 97.00 9,850.00 90.35 68.95 4,032.09 5,944.30 1,534.52 7.00 0.12 7.00 89.00 10,275.00 90.80 98.70 4,027.75 5,989.50 1,952.30 7.00 0.11 7.00 89.00 10,800.00 89.44 61.97 4,026.61 6,076.13 2,461.02 7.00 -0.26 -7.00 -92.00 111112017 7:28:35AM Page 2 COMPASS 5000.14 Build 85 101 ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: Conoco Phillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-4631-1 Design: CD2-463L1_wp03 f-�CE 6A R� UGHES a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100ft) (°) (usft) (usft) 8,529.01 90.16 348.74 4,036.16 4,850.04 1,058.85 3,342.01 0.00 0.00 5,979,007.40 372,570.86 TIP 8,600.00 90.02 347.19 4,036.05 4,919.47 1,044.05 3,363.91 2.19 -95.22 5,979,077.07 372,557.25 8,624.53 89.97 346.66 4,036.06 4,943.37 1,038.50 3,371.05 2.19 -95.22 5,979,101.05 372,552.11 KOP 8,645.53 87.03 346.66 4,036.60 4,963.79 1,033.66 3,377.07 14.00 -180.00 5,979,121.56 372,547.62 End 14 dls, Start 7 dls 8,675.53 85.55 348.15 4,038.55 4,993.00 1,027.13 3,386.02 7.00 135.00 5,979,150.88 372,541.60 4 8,700.00 85.55 349.87 4,040.45 5,016.95 1,022.48 3,393.97 7.00 90.00 5,979,174.90 372,537.36 8,705.53 85.55 350.26 4,040.88 5,022.38 1,021.52 3,395.86 7.00 89.87 5,979,180.34 372,536.50 5 8,735.53 86.60 352.08 4,042.93 5,051.96 1,016.93 3,406.66 7.00 60.00 5,979,209.99 372,532.41 6 8,800.00 88.15 356.32 4,045.88 5,116.01 1,010.42 3,433.06 7.00 70.00 5,979,274.14 372,527.00 8,900.00 90.58 2.89 4,046.99 5,215.94 1,009.73 3,482.42 7.00 69.81 5,979,374.06 372,528.03 8,975.00 92.39 7.82 4,045.05 5,290.56 1,016.72 3,525.79 7.00 69.73 5,979,448.54 372,536.29 7 9,000.00 92.33 9.57 4,044.02 5,315.25 1,020.50 3,541.40 7.00 92.00 5,979,473.17 372,540.49 9,100.00 92.06 16.57 4,040.19 5,412.53 1,043.08 3,609.60 7.00 92.07 5,979,570.03 372,564.73 9,200.00 91.76 23.56 4,036.86 5,506.35 1,077.34 3,686.18 7.00 92.34 5,979,663.24 372,600.60 9,250.00 91.60 27.06 4,035.39 5,551.52 1,098.71 3,727.27 7.00 92.57 5,979,708.04 372,622.74 8 9,300.00 91.17 30.54 4,034.18 5,595.32 1,122.79 3,770.02 7.00 97.00 5,979,751.41 372,647.56 9,400.00 90.30 37.48 4,032.90 5,678.16 1,178.68 3,859.85 7.00 97.08 5,979,833.27 372,704.86 9,450.00 89.86 40.96 4,032,83 5,716.89 1,210.29 3,906.59 7.00 97.17 5,979,871.45 372,737.13 9 9,500.00 89.92 44.46 4,032.93 5,753.62 1,244.20 3,954.32 7.00 89.00 5,979,907.60 372,771.66 9,600.00 90.05 51.45 4,032.96 5,820.55 1,318.41 4,052.06 7.00 88.99 5,979,973.24 372,847.00 9,700.00 90.17 58.45 4,032.77 5,877.94 1,400.23 4,151.61 7.00 88.99 5,980,029.21 372,929.79 9,800.00 90.29 65.45 4,032.37 5,924.93 1,488.43 4,251.48 7.00 89.00 5,980,074.68 373,018.77 9,850.00 90.35 68.95 4,032.09 5,944.30 1,534.52 4,301.08 7.00 89.03 5,980,093.26 373,065.18 10 9,900.00 90.41 72.45 4,031.76 5,960.83 1,581.70 4,350.20 7.00 89.00 5,980,108.97 373,112.63 10,000.00 90.52 79.45 4,030.95 5,985.09 1,678.64 4,446.29 7.00 89.02 5,980,131.56 373,209.97 10,100.00 90.63 86.45 4,029.94 5,997.35 1,777.82 4,538.31 7.00 89.08 5,980,142.12 373,309.34 10,200.00 90.73 93.45 4,028.75 5,997.44 1,877.75 4,624.90 7.00 89.15 5,980,140.50 373,409.25 10,275.00 90.80 98.70 4,027.75 5,989.50 1,952.30 4,685.49 7.00 89.23 5,980,131.29 373,483.64 11 10,300.00 90.74 96.95 4,027.42 5,986.10 1,977.06 4,705.24 7.00 -92.00 5,980,127.46 373,508.34 10,400.00 90.48 89.95 4,026.35 5,980.08 2,076.81 4,788.61 7.00 -92.02 5,980,119.73 373,607.96 10,500.00 90.22 82.96 4,025.73 5,986.26 2,176.56 4,878.08 7.00 -92.10 5,980,124.20 373,707.79 10,600.00 89.96 75.96 4,025.57 6,004.54 2,274.81 4,972.31 7.00 -92.14 5,980,140.79 373,806.34 10,700.00 89.70 68.97 4,025.86 6,034.64 2,370.10 5,069.89 7.00 -92.15 5,980,169.25 373,902.12 10,800.00 89.44 61.97 4,026.61 6,076.13 2,461.02 5,169.37 7.00 -92.13 5,980,209.17 373,993.73 Planned TD at 10800.00 111112017 7.28:35AM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips Database: EDT Alaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-1 Design: CD2-463L1_wp03 Targets ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Target Name hit/miss target Dip Angle Dip Dir. TVD +NI-S +E/-W Northing Shape (1) V) (usft) (usft) (usft) (usft) CD2-463 T7 0.00 0.00 4,018.00 1,553.87 983.78 5,975,713.27 plan misses target center by 3297.08usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-463L1_T02 0.00 0.00 4,037.00 5,506.42 1,078.20 5,979,663.30 plan misses target center by 0.78usft at 9200.43usft MD (4036.84 TVD, 5506.74 N, 1077.52 E) Point CD2-463 T4.1 0.00 0.00 4,033.00 5,753.32 1,244.02 5,979,907.30 plan misses target center by 0.11 usft at 9499.65usft MD (4032.93 TVD, 5753.38 N, 1243.95 E) Point CD2-463 T21 0.00 0.00 4,036.00 5,785.63 92.22 5,979,959.35 plan misses target center by 1020.03usft at 9124.35usft MD (4039.33 TVD, 5435.75 N, 1050.36 E) Point CD2-463 T22 0.00 0.00 4,031.00 5,751.88-243.28 5,979,931.36 plan misses target center by 1330.39usft at 9100.00usft MD (4040.19 TVD, 5412.53 N, 1043.08 E) Point CD2-463 T1 0.00 0.00 4,026.00 1,843.85 1,621.96 5,975,992.24 plan misses target center by 3058.49usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-463 T12 0.00 0.00 4,020.00 1,410.68-429.07 5,975,594.33 plan misses target center by 3747.45usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-4631-1_T01 0.00 0.00 4,047.00 5,199.17 1,009.44 5,979,357.30 plan misses target center by 0.41 usft at 8883.23usft MD (4047.10 TVD, 5199.18 N, 1009.05 E) Point CD2-463 T15 0.00 0.00 4,034.00 5,853.95 1,338.32 5,980,006.29 plan misses target center by 14.56usft at 9635.49usft MD (4032.91 TVD, 5842.06 N, 1346.64 E) Point CD2-463 T8 0.00 0.00 4,020.00 1,534.78 803.07 5,975,697.28 plan misses target center by 3325.16usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-463 T24 0.00 0.00 4,033.00 5,723.03-526.84 5,979,907.37 plan misses target center by 1597.97usft at 9047.79usft MD (4042.13 TVD, 5362.09 N, 1029.80 E) Point CD2-463 T14 0.00 0.00 4,027.00 5,791.68 972.30 5,979,950.31 plan misses target center by 233.64usft at 9378.73usft MD (4033.05 TVD, 5661.12 N, 1165.96 E) Point CD2-463 T23 0.00 0.00 4,033.00 5,737.33-392.06 5,979,919.37 plan misses target center by 1470.99usft at 9092.20usft MD (4040.47 TVD, 5405.05 N, 1040.89 E) Point CD2-463 T10 0.00 0.00 4,026.00 1,466.10 121.10 5,975,640.31 plan misses target center by 3511.49usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-4631-1 CTD Polygo 0.00 0.00 0.00 5,327.65 1,152.28 5,979,483.30 plan misses target center by 4041.49usft at 9192.58usft MD (4037.08 TVD, 5499.54 N, 1074.41 E) Polygon Point 1 0.00 0.00 0.00 5,979,483.30 Point 0.00 316.77 156.59 5,979,797.31 Point 3 0.00 448.42 309.36 5,979,926.31 Point 0.00 551.80 678.67 5,980,023.33 Point 5 0.00 555.08 869.65 5,980,023.34 Point 0.00 632.27 1,286.42 5,980,093.37 BA ER BAT a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Easting (usft) Latitude Longitude 372,439.30 70° 20' 30.888 N 151' 2' 6.913 W 372,601.46 70° 21' 9.761 N 151' 2' 4.139 W 372,771.47 700 21' 12.189 N 151' V 59.291 W 371,620.49 70' 21' 12.508 N 151° 2' 32.957 W 371,284.49 70' 21' 12.176 N 151° 2' 42.763 W 373,082.30 70° 20' 33.739 N 151' V 48.269 W 371,024.31 70° 20' 29.480 N 151' 2' 48.186 W 372,527.45 70° 21' 6.739 N 151 ° 2' 6.149 W 372,867.47 70' 21' 13.179 N 151' V 56.534 W 372,258.30 70° 20' 30.701 N 151' 2' 12.192 W 371,000.50 70' 21' 11.892 N 151° 2' 51.051 W 372,500.48 70° 21' 12.567 N 151° 2' 7.233 W 371,135.50 70° 21' 12.033 N 151' 2' 47.112 W 371,575.31 70° 20' 30.026 N 151' 2' 32.115 W 372,672.45 700 21' 8.003 N 151* 2' 1.974 W 372,672.45 372,834.44 372,989.43 373,360.43 373,551.42 111112017 7:28:35AM Page 4 COMPASS 5000.14 Build 85 ILJ 0 - ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Welibore: CD2-4631-1 Design: CD2-463L1_wp03 BA (ER BA a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Point 0.00 752.98 1,442.38 5,980,211.38 374,127.41 Point 0.00 814.04 1,154.27 5,980,277.36 373,840.42 Point 0.00 768.41 1,002.02 5,980,234.35 373,687.42 Point 10 0.00 767.46 597.94 5,980,240.33 373,283.42 Point 11 0.00 745.07 401.28 5,980,221.32 373,086.42 Point 12 0.00 569.89 44.21 5,980,052.30 372,726.42 Point 13 0.00 369.24 -107.37 5,979,854.29 372,571.44 Point 14 0.00 0.00 0.00 5,979,483.30 372,672.45 CD2-4631-1_T05 0.00 0.00 4,027.00 6,076.22 2,461.75 5,980,209.25 373,994.47 70° 21' 15.362 N 151° V 23.695 W plan misses target center by 0.83usft at 10800.00usft MD (4026.61 TVD, 6076.13 N, 2461.02 E) Point CD2-4631-2-01 CTD Pol, 0.00 0.00 0.00 1,957.04 1,455.99 5,976,,108.25 372,918.31 70° 20' 34.853 N 151' V 53.117 W plan misses target center by 4981.75usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Polygon Point 0.00 0.00 0.00 5,976,108.25 372,918.31 Point 2 0.00 332.82 -14.73 5,976,441.25 372,909.29 Point 0.00 482.70 150.73 5,976,588.26 373,077.28 Point4 0.00 554.17 351.55 5,976,656.27 373,279.28 Point 5 0.00 538.87 566.86 5,976,637.28 373,494.28 Point 0.00 336.88 1,209.48 5,976,424.32 374,133.29 Point 0.00 287.15 1,633.44 5,976,367.33 374,556.30 Point 0.00 337.73 1,840.61 5,976,414.35 374,764.29 Point 0.00 97.21 1,929.77 5,976,172.36 374,849.31 Point 10 0.00 24.62 1,663.96 5,976,104.34 374,582.31 Point 11 0.00 49.09 993.38 5,976,140.30 373,912.30 Point 12 0.00 295.34 365.00 5,976,397.27 373,288.29 Point 13 0.00 -59.04 173.05 5,976,046.26 373,090.31 Point 14 0.00 0.00 0.00 5,976,108.25 372,918.31 CD2-4631-1-01 CTD Pol, 0.00 0.00 0.00 5,618.20 888.25 5,979,778.31 372,413.47 70' 21' 10.861 N 151' 2' 9.690 W plan misses target center by 4041.06usft at 9300.O0usft MD (4034.18 TVD, 5595.32 N, 1122,79 E) Polygon Point 1 0.00 0.00 0.00 5,979,778.31 372,413.47 Point 0.00 196.05 -232.42 5,979.978.30 372,184,46 Point 3 0.00 282.07 -464.96 5,980,068.29 371,953.45 Point 0.00 314.89 -708.58 5,980,105.28 371,710.45 Point 0.00 223.21 -1,619.21 5,980,029.23 370,798.46 Point 0.00 -36.74 -1,554.72 5,979,768.23 370,858.48 Point 0.00 -11.37 -1,359.12 5,979,790.24 371,054.47 Point 8 0.00 19.37 -734.50 5,979,810.27 371,679.47 Point 0.00 -58.27 -422.09 5,979,727.29 371,990.48 Point 10 0.00 -152.10 -294.45 5,979,631.29 372,116.48 Point 11 0.00 -274.48 -140.31 5,979,506.30 372,268.49 Point 12 0.00 -523.70 -34.00 5,979,255.31 372,370.50 Point 13 0.00 -630.35 -12.16 5,979,148.31 372,390.51 Point 14 0.00 0.00 0.00 5,979,778.31 372,413.47 CD2-4631-1_T03 0.00 0.00 4.026.00 5,990.90 2,210.16 5,980,128.26 373,741.47 70° 21' 14.523 N 151' 1' 31.050 W plan misses target center by 0.44usft at 10533.90usft MD (4025.62 TVD, 5991.11 N, 2210.11 E) Point CD2-463 T11 0.00 0.00 4,020.00 1,418.99 -352.20 5,975,601.33 371,101.31 70° 20' 29.562 N 151' 2' 45.941 W plan misses target center by 3709.91 usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-4631-2 CTD Polygo 0.00 0.00 0.00 2,050.93 1,506.39 5,976,201.25 372,970.31 70' 20' 35.776 N 151' V 51.644 W plan misses target center by 4932.14usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Polygon Point 1 0.00 0.00 0.00 5,976,201.25 372,970.31 Point 2 0.00 87.56 -375.59 5,976,295.23 372,596.31 Point 0.00 -36.90 -691.52 5,976,176,22 372,278.32 Point 0.00 -199.76 -855.76 5,976,016.21 372,111.32 Point 0.00 -330.31 -1,176.59 5,975,891.19 371,788.33 Point 6 0.00 -417.97 -2,086.29 5,975,819.15 370,877.33 Point 7 0.00 -796.38 -2,046.77 5,975,440.14 370,910.36 111112017 7.28:35AM Page 5 COMPASS 5000.14 Build 85 0 ConocoPhillips ConocoPhillips Planning Report Database: EDTAlaska Sandbox Local Co-ordinate Reference: Company: Conoco Phillips (Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-4631-1 Design: CD2-463L1_wp03 BA ER BAT a 6E company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Point 0.00-792.86-1,667.75 5,975,437.17 371,289.35 Point 9 0.00-660.20-874.85 5,975,556.20 372,084.34 Point 10 0.00-480.39-539.86 5,975,730.23 372,422.34 Point 11 0.00-322.12-351.54 5,975,885.23 372,613.33 Point 12 0.00-318.94-166.55 5,975,885.24 372,798.33 Point 13 0.00-529.21 -4.90 5,975,672.25 372,956.34 Point 14 0.00 0.00 0.00 5,976,201.25 372,970.31 CD2-463L1_T04 0.00 0.00 4,026.00 6,028.37 2,354.55 5,980,163.25 373,886.47 70° 21' 14.891 N 151' 1' 26.829 W plan misses target center by 0.49usft at 10683.27usft MD (4025.78 TVD, 6028.80 N, 2354.43 E) Point CD2-463 T16 0.00 0.00 4,025.00 6,021.96 2,330.65 5,980,157.25 373,862.47 70' 21' 14.829 N 151' 1' 27.527 W plan misses target center by 1.45usft at 10658.53usft MD (4025.68 TVD, 6020.75 N, 2331.04 E) Point CD2-463 T6 0.00 0.00 4,024.00 1,607.05 1,519.99 5,975,757.25 372,976.29 70' 20' 31.410 N 151' 1' 51.249 W plan misses target center by 3275.64usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-463 T9 0.00 0.00 4,017.00 1,515.36 603.36 5,975,681.29 372,058.30 70' 20' 30.510 N 151° 2' 18.027 W plan misses target center by 3365.71 usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-463 T2 0.00 0.00 4,017.00 1,939.49 2,184.44 5,976,078.22 373,646.30 70' 20' 34.678 N 151' 1' 31.836 W plan misses target center by 3120.68usft at 8529.01 usft MD (4036.16 TVD, 4850.04 N, 1058.85 E) Point CD2-463 T17 0.00 0.00 4,026.00 6,048.66 2,488.23 5,980,181.24 374,020.46 70' 21' 15.091 N 151' 1' 22.921 W plan misses target center by 38.67usft at 10800.00usft MD (4026.61 TVD, 6076.13 N, 2461.02 E) Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 10,800.00 4,026.61 2 3/8" 2.375 3.000 Plan Annotations Measured Vertical Depth Depth (usft) (usft) 8,529.01 4,036.16 8,624.53 4,036.06 8,645.53 4,036.60 8,675.53 4,038.55 8,705.53 4,040.88 8,735.53 4,042.93 8,975.00 4,045.05 9,250.00 4,035.39 9,450.00 4,032.83 9,850.00 4,032.09 10,275.00 4,027.75 10,800.00 4,026.61 Local Coordinates +N/-S +E/-W (usft) (usft) 4,850.04 1,058.85 4,943.37 1,038.50 4,963.79 1,033.66 4,993.00 1,027.13 5,022.38 1,021.52 5,051.96 1,016.93 5,290.56 1,016.72 5,551.52 1,098.71 5,716.89 1,210.29 5,944.30 1,534.52 5,989.50 1,952.30 6,076.13 2,461.02 Comment TIP KOP End 14 dls, Start 7 dls 4 5 6 7 8 9 10 11 Planned TD at 10800.00 111112017 7:28:35AM Page 6 COMPASS 5000.14 Build 85 E ConocoPhillips Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Reference Site: CD2 Alpine Pad Site Error: 0.00 usft Reference Well: CD2-463 Well Error: 0.00 usft Reference Wellbore CD24631-1-01 Reference Design: CD24631-1-01_wp02 Baker Hughes INTEQ Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: BA ER I IGHES BAT GEcompany Well CD2-463 CD2-463 @ 53.03usft (Doyon 19) CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference CD2-463L1-01_wp02 -filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: 8,705.00 to 10,650.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,261.27 usft Error Surface: Pedal Curve Survey Tool Program Date 10/31/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 81.00 447.00 CD2-463 Gyro (CD2-463) CB -GYRO -SS Camera based gyro single shot 474.54 8,529.01 CD2-463 MWD+SAG+CA+IIFR+MS (CD2 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8,529.01 8,705.00 CD2-463L1_wp03 (CD2-463L1) MWD MWD - Standard 8,705.00 10,650.00 CD2-463L1-01_wp02 (CD2-463L1-01) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 2,615.50 2,376.92 10-3/4" x 13-1/2" 10-3/4 13-1/2 5,148.60 4,076.09 7-5/8" x 9-7/8" 7-5/8 9-7/8 10,650.00 4,045.57 2 3/8" 2-3/8 3 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) CD2 Alpine Pad 2017 - 4 Prelim: CD2-118-A (FWK-4) - CD2-118-A Out of range 2017 - 4 Prelim: CD2-119-A (1XL) - CD2-119-A - C 8,808.74 7,350.00 566.83 168.74 428.57 Pass - Major Risk 2017 - 4 Prelim: CD2-120-A (301) - CD2-120-A - C Out of range 2017 - 4 Prelim: CD2-415 (103) - CD2-415 - CD24 Out of range 2017 - 4 Prelim: CD2-416 (117) - CD2-416 - CD2-4 Out of range 2017 - 4 Prelim: CD2-417 (1XM) - CD2-417 - CD2 8,710.72 7,625.00 955.12 162.31 795.94 Pass - Major Risk 2017 - 4 Prelim: CD2-418 (FWK-5) - CD2-418 - CD 8,730.77 7,250.00 389.27 159.92 244.31 Pass - Major Risk 2017 - 4 Prelim: CD2-419 (115) - CD2-419 - CD2-4 9,209.90 7,525.00 188.28 152.76 59.32 Pass - Major Risk 2017 - 4 Prelim: CD2-420 (116) - CD2-420 - CD2-4 9,694.97 7,700.00 168.68 121.22 60.23 Pass - Major Risk 2017 - 4 Prelim: CD2-421 (102) - CD2-421 - CD2- 9,895,54 7,575.00 430.37 110.31 328.95 Pass - Major Risk CD2-07 - CD2-07 - CD2-07 8,705.00 7,150.00 1,182.58 144.79 1,071.33 Pass - Major Risk CD2-07 - CD2-07PB1 - CD2-07PB1 8,705.00 7,150.00 1,182.58 144.79 1,071.33 Pass - Major Risk CD2-07 - CD2-07PB2 - CD2-07PB2 8,705.00 7,150.00 1,182.58 144.79 1.071.33 Pass - Major Risk CD2-10 - CD2-10 - CD2-10 8,705.00 6,825.00 898.13 148.17 777.77 Pass - Major Risk CD2-10 - CD2-10PB1 - CD2-10PB1 8,705.00 6,825.00 898.13 148.17 777.77 Pass - Major Risk CD2-16 - CD2-16 - CD2-16 Out of range CD2-16 - CD2-16 (Sag) - CD2-16 (Sag) Out of range CD2-17 - CD2-17A - CD2-17A Out of range CD2-28 - CD2-28 - CD2-28 Out of range CD2-463 - CD2-463 - CD2-463 8,975.04 8,975.00 8.52 20.67 -9.75 FAIL - Major Risk CD2-463 - CD2-463L1 - CD2-463L1_wp03 9,017.95 9,050.00 98.26 1.37 98.03 Pass - Minor 1/10 CD2-465 - CD2-465 - CD2-465 10,061,91 7,625.00 554.71 113.55 446.39 Pass - Major Risk CD2-466 - CD2-466 - CD2-466 Out of range CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1013112017 10:27.42AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Project: Western North Slope Site: CD2 Alpine Pad MaaI;n1 NTodn: Nort • Magnetic Field WELLBORE DETAILS: CD2-463L1 REFERENCE WFORMATION Parent Wellbore: CD2-463 Co-ordinate(ME) Reference: Well CO2463, True North Well: CD2.463 Strength: 57449.9anT Tie on MD: 8529.01 Vertical (TVD) Reference: Mean See Level Wellbore: CD2-463L1 Dip Angle: 80.81• Section (VS) Reference: Slot -(0.00N, 0.00E) Plan: CD24631_1 W 03 CD2463/CD2-463L1 P ( I Dare: 211I2018 Model: BGGM2017 Measured Depth Reference: CD2463@ 53.03usfl(Doyon 19) Calculation Method: Minimum Curvalure WELL DETAILS: CD2-463 +N/-S +E/-W Northing Easting Latitude Longitude 0.00 0.00 5974176.62 371429.10 70° 20' 15.607 N 151e 2' 35.652 W Sec MD Inc Azi TOSS +N/-S +E/-W Meg TFace VSect Annotation 1 8529.01 90.16 348.74 4036.16 4850.04 1058.85 0.00 0.00 3342.01 TIP 2 8624.53 89.97 346.66 4036.06 4943.37 1038.50 2.19 -95.22 3371.05 KOP 3 8645.53 87.03 346.66 4036.60 4963.79 1033.66 14.00 180.00 3377.07 End 14 d1s, Start 7 dls 4 8675.53 85.55 348.15 4038.55 4993.00 1027.13 7.00 135.00 3386.02 4 5 8705.53 85.55 350.26 4040.88 5022.38 1021.52 7.00 90.00 3395.86 5 6 8735.53 86.60 352.08 4042.93 5051.96 1016.93 7.00 60.00 3406.66 6 7 8975.00 92.39 7.82 4045.05 5290.56 1016.72 7.00 70.00 3525.79 7 8 9250.00 91.60 27.06 4035.39 6551.52 1098.71 7.00 92.00 3727.27 8 9 9450.00 89.86 40.96 4032.83 5716.89 1210.29 7.00 97.00 3906.59 9 10 9850.00 90.35 68.95 4032.09 5944.30 1534.52 7.00 89.00 4301.08 10 11 10275.00 90.80 98.70 4027.75 5989.50 1952.30 7.00 89.00 4685.49 11 12 10800.00 89.44 61.97 4026.61 6076.13 2461.02 7.00 -92.00 5169.37 Planned TD at 10800.00 0 H Mean 700( 680( 660( 640( 620( 600( c580( 0 N `- 560( t, 540( j0 ^520( 500( 0 480( 460( 440C 420C BA CER F�UGHES a GE company ■■��itl�fitiii�■.1■■■■■■� Ma .■■■■EE■■ISM■ MIN In MEN .■■■■■■■■■■ UNNEE■■. IMENEENNEENNEENEENE O O O O O N A T Op O N A O, O O O O O O O O O O O O O O O O O O O O O O O West( -)/East(+) (200 usft/in) 3400 3500 I I a a a 3600 m � � v 3700 Ca A A i 3800 C 2-463 CD2- G3L1- I 1 � ' i �PI nnect atI `CD2 800.00 3900 I D2-4 /CD2 63 D2- 63L1 CD2 3/CD 463 -01 I 4000 r �y 774 r" , :>'i '•• aloo t CD2 3/CD -463 '- 4 ,5 6 7 8 9 10 1 4200 KO End 14 Is, S 7 dls 4300 4400 ;ea L O O O O O O O O O O O 0 O N O O O .w+ NN O O 'S O A O W ']1 O O O O S O O O O O AA O O O O O O O O O O O O Vertical Section at 60.001 (100 usft/in) I 0 • ConocoPhillips ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD2 Alpine Pad CD2-463 CD2-4631-1-01 Plan: CD2-463L1-01 wp02 Standard Planning Report 01 November, 2017 BER BA 0 GEcompany 0 0 ConocoPhillips Database: EDT Alaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-1-01 Design: CD2-463L1-01_wp02 ConocoPhillips BAKER Planning Report UGHES a GE company Local Co-ordinate Reference: Well CD2-463 TVD Reference: Mean Sea Level MD Reference: CD2-463 @ 53.03usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD2 Alpine Pad Site Position: Northing: 5,974,641.66 usft Latitude: 70° 20' 20.225 N From: Map Easting: 371,696.24usft Longitude: 151° 2' 28.083 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: -0.98 ° Well CD2-463 Well Position +N/-S 0.00 usft Northing: 5,974,176.62 usft Latitude: 70° 20' 15.607 N +E/-W 0.00 usft Easting: 371,429.10 usft Longitude: 151° 2' 35.652 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 15.70 usft Wellbore CD2-4631-1-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2017 2/1/2018 16.84 80.81 57,444 Design CD2-463L1-01_wp02 Audit Notes: Version: Phase: PLAN Tie On Depth: 8,705.00 Vertical Section: Depth From (TVD) +N/-S +E1-W Direction (usft) (usft) (usft) (°) -15.70 0.00 0.00 300.00 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100ft) (°/100ft) (°/100ft) (°) Target 8,705.00 85.55 35D.22 4,040.83 5,021.86 1,021.61 D.00 0.00 0.00 0.00 8,805.00 92.55 350.22 4,042.49 5,120.33 1,004.64 7.00 7.00 0.00 0.00 9,005.00 93.44 336.23 4,031.99 5,311.08 947.14 7.00 0.45 -7.00 -86.00 9,305.00 93.21 315.19 4,014.39 5,557.12 779.36 7.00 -0.08 -7.01 -90.00 9,550.00 90.72 298.21 4,005.92 5,702.90 583.77 7.00 -1.02 -6.93 -98.00 9,750.00 90.70 284.21 4,003.44 5,775.08 397.80 7.00 -0.01 -7.00 -90.00 10,000.00 88.57 266.84 4,005.05 5,799.07 149.93 7.00 -0.85 -6.95 -97.00 10,150.00 92.16 256.97 4,004.10 5,777.98 1.63 7.00 2.40 -6.58 -70.00 10,400.00 92.06 274.49 3,994.82 5,759.45 -246.53 7.00 -0.04 7.00 90.00 10,650.00 88.98 257.26 3,992.54 5,741.52 -494.90 7.00 -1.23 -6.89 -100.00 111112017 7:31:33AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips 6Ad<Ek ConocoPhillips Planning Report UGHES a GE company Database: EDTAlaska Sandbox Local Co-ordinate Reference: Well CD2-463 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Mean Sea Level Project: Western North Slope MD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad North Reference: True Well: CD2-463 Survey Calculation Method: Minimum Curvature Wellbore: CD2-463L1-01 Design: CD2-463L1-01_wp02 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°/10oft) (°) (usft) (usft) 8,705.00 85.55 350.22 4,040.83 5,021.86 1,021.61 1,626.19 0.00 0.00 5,979,179.82 372,536.58 TIP/KOP 8,800.00 92.20 350.22 4,042.70 5,115.41 1,005.49 1,686.93 7.00 0.00 5,979,273.62 372,522.06 8,805.00 92.55 350.22 4,042.49 5,120.33 1,004.64 1,690.12 7.00 0.00 5,979,278.56 372,521.29 Start 7 dis 8,900.00 92.99 343.58 4,037.89 5,212.70 983.14 1,754.93 7.00 -86.00 5,979,371.27 372,501.38 9,000.00 93.42 336.58 4,032.29 5,306.51 949.14 1,831.28 7.00 -86.32 5,979,465.65 372,469.00 9,005.00 93.44 336.23 4,031.99 5,311.08 947.14 1,835.29 7.00 -86.71 5,979,470.25 372,467.08 3 9,100.00 93.42 329.57 4,026.30 5,395.45 903.96 1,914.87 7.00 -90.00 5,979,555.34 372,425.36 9,200.00 93.34 322.55 4,020.40 5,478.22 848.26 2,004.49 7.00 -90.40 5,979,639.04 372,371.09 9,300.00 93.22 315.54 4,014.67 5,553.57 782.87 2,098.80 7.00 -90.81 5,979,715.50 372,307.00 9,305.00 93.21 315.19 4.014.39 5,557.12 779.36 2,103.62 7.00 -91.21 5,979,719.11 372,303.56 4 9,400.00 92.27 308.60 4,009.84 5,620.45 708.77 2,196.42 7.00 -98.00 5,979,783.64 372,234.06 9,500.00 91.24 301.67 4,006.78 5,677.95 627.08 2,295.91 7.00 -98.32 5,979,842.52 372,153.38 9,550.00 90.72 298.21 4,005.92 5,702.90 583.77 2,345.89 7.00 -98.53 5,979,868.21 372,110.51 5 9,600.00 90.72 294.71 4,005.29 5,725.17 539.02 2,395.79 7.00 -90.00 5,979,891.25 372,066.15 9,700.00 90.71 287.71 4,004.05 5,761.33 445.86 2,494.54 7.00 -90.04 5,979,928.99 371,973.63 9,750.00 90.70 284.21 4,003.44 5,775.08 397.80 2,543.04 7.00 -90.13 5,979,943.56 371,925.82 6 9,800.00 90.27 280.74 4,003.01 5,785.88 348.99 2,590.71 7.00 -97.00 5,979,955.19 371,877.20 9,900.00 89.41 273.79 4,003.29 5,798.51 249.85 2,682.88 7.00 -97.03 5,979,969.53 371,778.31 10,000.00 88.57 266.84 4,005.05 5,799.07 149.93 2,769.69 7.00 -97.01 5,979,971.79 371,678.42 7 10,100.00 90.96 260.26 4,005.46 5,787.84 50.62 2,850.08 7.00 -70.00 5,979,962.28 371,578.94 10,150.00 92.16 256.97 4,004.10 5,777.98 1.63 2,887.58 7.00 -69.97 5,979,953.26 371,529.79 8 10,200.00 92.16 260.48 4,002.21 5,768.22 -47.36 2,925.12 7.00 90.00 5,979,944.33 371,480.65 10,300.00 92.12 267.48 3,998.47 5,757.74 -146.68 3,005.90 7.00 90.13 5,979,935.56 371,381.17 10,400.00 92.06 274.49 3,994.82 5,759.45 -246.53 3,093.23 7.00 90.39 5,979,938.99 371,281.37 9 _ 10,500.00 90.83 267.59 3,992.29 5,761.26 -346.42 3,180.64 7.00 -100.00 5,979,942.51 371,181.53 10,600.00 89.59 260.70 3,991.91 5,751.07 -445.84 3,261.64 7.00 -100.17 5,979,934.02 371,081.96 10,650.00 88.98 257.26 3,992.54 5,741.52 -494.90 3,299.36 7.00 -100.20 5,979,925.31 371,032.74 Planned TD at 10650.00 111112017 7:31:33AM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips BAT BA_ KER ConocoPhillips Planning Report IGHES GE company Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well CD2-463 Company: Conoco Phillips(Alaska) Inc. -WNS TVD Reference: Mean Sea Level Project: Western North Slope MD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad North Reference: True Well: CD2-463 Survey Calculation Method: Minimum Curvature Wellbore: CD2-4631-1-01 Design: CD2-463L1-01_wp02 Targets Target Name hittmiss target Dip Angle Dip Dir. TVD +Nl-S +El-W Northing Shape (°) (°) (usft) (usft) (usft) (usft) CD2-463 T21 0.00 0.00 4,036.00 5,785.63 92.22 5,979,959.35 plan misses target center by 31.31 usft at 10059.02usft MD (4005.80 TVD, 5793.82 N, 91.16 E) Point CD2-463 T22 0.00 0.00 4,031.00 5,751.88-243.28 5,979,931.36 plan misses target center by 36.76usft at 10395.29usft MD (3994.99 TVD, 5759.10 N,-241.84 E) Point CD2-463 T19 0.00 0.00 4,025.00 5,860.30 832.10 5,980,021.32 plan misses target center by 266.23usft at 9436.72usft MD (4008.51 TVD, 5642.71 N, 679.59 E) Point CD2-4631-1-01_T05 0.00 0.00 4,030.00 5,744.97-355.18 5,979,926.37 plan misses target center by 41.04usft at 10510.24usft MD (3992.15 TVD, 5760.77 N,-356.65 E) Point CD2-463 T24 0.00 0.00 4,033.00 5,723.03-526.84 5,979,907.37 plan misses target center by 54.76usft at 10650.00usft MD (3992.54 TVD, 5741.52 N,-494.90 E) Point CD2-4631-1-01_T02 0.00 0.00 4,025.00 5,656.09 647.55 5,979,820.32 plan misses target center by 18.98usft at 9470.12usft MD (4007.51 TVD, 5661.80 N, 652.21 E) Point CD2-4631-1-01_T04 0.00 0.00 4,036.00 5,776,76 41.36 5,979,951.35 plan misses target center by 32.12usft at 10110.43usft MD (4005.26 TVD, 5786.02 N, 40.35 E) Point CD2-463 T23 0.00 0.00 4,033.00 5,737.33-392.06 5,979,919.37 plan misses target center by 46.05usft at 10547.72usft MD (3991.84 TVD, 5757.89 N,-394.01 E) Point Easting (usft) Latitude Longitude 371,620.49 70° 21' 12.508 N 151 ° 2' 32.957 W 371,284.49 70° 21' 12.176 N 151 ° 2' 42.763 W 372,361.48 70° 21' 13.242 N 151° 2' 11.331 W 371,172.50 70° 21' 12.108 N 151 ° 2' 46.034 W 371,000.50 70° 21' 11.892 N 151° 2' 51.051 W 372,173.48 70° 21' 11.233 N 151° 2' 16.725 W 371,569.49 70° 21' 12.420 N 151° 2' 34.443 W 371,135.50 70° 21' 12.033 N 151 ° 2' 47.112 W CD2-463L1 CTD Polygo 0.00 0.00 0.00 5,327.65 1,152.23 5,979,483.30 372,672.45 70° 21' 8,003 N 151° 2' 1.974 W plan misses target center by 4034.21 usft at 9143.33usft MD (4023.73 TVD, 5432.14 N, 881.07 E) Polygon Point 1 0.00 0.00 0.00 5,979,483.30 372,672.45 Point 2 0.00 316.77 156.59 5,979,797.31 372,834.44 Point 3 0.00 448.42 309.36 5,979,926.31 372,989.43 Point 4 0.00 551.80 678.67 5,980,023.33 373,360.43 Point 5 0.00 555.08 869.65 5,980,023.34 373,551.42 Point 0.00 632.27 1,286.42 5,980,093.37 373,969.42 Point 0.00 752.98 1,442.38 5,980,211.38 374,127.41 Point 8 0.00 814.04 1,154.27 5,980,277.36 373,840.42 Point 9 0.00 768.41 1,002.02 5,980,234.35 373,687.42 Point 10 0.00 767.46 597.94 5,980,240.33 373,283.42 Point 11 0.00 745.07 401.28 5,980,221.32 373,086.42 Point 12 0.00 569.89 44.21 5,980,052.30 372,726.42 Point 13 0.00 369.24 -107.37 5,979,854.29 372,571.44 Point 14 0.00 0.00 0.00 5,979,483.30 372,672.45 CD2-463L2-01 CTD Pol, 0.00 0.00 0.00 1,957.04 1,455.99 5,976,108.25 372,918.31 70° 20' 34.853 N 151° 1' 53.117 W plan misses target center by 5090.20usft at 8705.00usft MD (4040.83 TVD, 5021.86 N, 1021.61 E) Polygon Point 0.00 0.00 0.00 5,976,108.25 372,918.31 Point 0.00 332.82 -14.73 5,976,441.25 372,909.29 Point 3 0.00 482.70 150.73 5,976,588.26 373,077.28 Point 4 0.00 554.17 351.55 5,976,656.27 373,279.28 Point 5 0.00 538.87 566.86 5,976,637.28 373,494.28 Point 0.00 336.88 1,209.48 5,976,424.32 374,133.29 Point 0.00 287.15 1,633.44 5,976,367.33 374.556.30 Point 0.00 337.73 1,840.61 5,976,414.35 374,764.29 Point 0.00 97.21 1,929.77 5,976,172.36 374,849.31 111112017 7:31:33AM Page 4 COMPASS 5000.14 Build 85 0 19 ConocoPhillips ConocoPhillips Planning Report �IUGHES 1a GE company Database: EDT Alaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-1-01 Design: CD2-4631-1-01_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Point 10 0.00 24.62 1,663.96 5,976,104.34 374,582.31 Point 11 0.00 49.09 993.38 5,976,140.30 373,912.30 Point 12 0.00 295.34 365.00 5,976,397.27 373,288.29 Point 13 0.00 -59.04 173.05 5,976,046.26 373,090.31 Point 14 0.00 0.00 0.00 5,976,108.25 372,918.31 CD2-463L1-01 CTD Poll 0.00 0.00 0.00 5,618.20 888.25 5,979,778.31 372,413.47 70° 21' 10.861 N 151° 2' 9.690 W plan misses target center by 4013.86usft at 9400.00usft MD (4009.84 TVD, 5620.45 N, 708.77 E) Polygon Point 1 0.00 0.00 0.00 5,979,778.31 372,413.47 Point 0.00 196.05 -232.42 5,979,978.30 372,184.46 Point 3 0.00 282.07 -464.96 5,980,068.29 371,953.45 Point 0.00 314.89 -708.58 5,980,105.28 371,710.45 Point 5 0.00 223.21 -1,619.21 5,980,029.23 370,798.46 Point 0.00 -36.74 -1,554.72 5,979,768.23 370,858.48 Point 0.00 -11.37 -1,359.12 5,979,790.24 371,054.47 Point 8 0.00 19.37 -734.50 5,979,810.27 371,679.47 Point 9 0.00 -58.27 -422.09 5,979,727.29 371,990.48 Point 10 0.00 -152.10 -294.45 5,979,631.29 372,116.48 Point 11 0.00 -274.48 -140.31 5,979,506.30 372,268.49 Point 12 0.00 -523.70 -34.00 5,979,255.31 372,370.50 Point 13 0.00 -630.35 -12.16 5,979,148.31 372,390.51 Point 14 0.00 0.00 0.00 5,979,778.31 372,413.47 CD2-4631-1-01_T01 0.00 0.00 4,046.00 5,102.11 1,007.10 5,979,260.30 372,523.45 70° 21' 5.785 N 151° 2' 6.218 W - plan misses target center by 2.97usft at 8786.68usft MD (4043.10 TVD, 5102.29 N, 1007.75 E) - Point CD2-463L2 CTD Polygo 0.00 0.00 0.00 2.050.93 1,506.39 5,976,201.25 372,970.31 70° 20' 35.776 N 151° 1' 51.644 W plan misses target center by 5038.83usft at 8705.00usft MD (4040.83 TVD, 5021.86 N, 1021.61 E) Polygon Point 1 0.00 0.00 0.00 5,976,201.25 372,970.31 Point 2 0.00 87.56 -375.59 5,976,295.23 372,598.31 Point 0.00 -36.90 -691.52 5,976,176.22 372,278.32 Point 0.00 -199.76 -855.76 5,976,016.21 372,111.32 Point 5 0.00 -330.31 -1,176.59 5,975,891.19 371,788.33 Point 6 0.00 -417.97 -2,086.29 5,975,819.15 370,877.33 Point 0.00 -796.38 -2,046.77 5,975,440.14 370,910.36 Point 8 0.00 -792.86 -1,667.75 5,975,437.17 371,289.35 Point 9 0.00 -660.20 -874.85 5,975,556.20 372,084.34 Point 10 0.00 -480.39 -539.86 5,975,730.23 372,422.34 Point 11 0.00 -322.12 -351.54 5,975,885.23 372,613.33 Point 12 0.00 -318.94 -166.55 5,975,885.24 372,798.33 Point 13 0.00 -529.21 -4.90 5,975,672.25 372,956.34 Point 14 0.00 0.00 0.00 5,976,201.25 372,970.31 CD2-463 T20 0.00 0.00 4,025.00 5,831.29 539.53 5,979,997.33 372,068.49 70° 21' 12.957 N 151° 2' 19.882 W plan misses target center by 99.74usft at 9637.69usft MD (4004.82 TVD, 5740.13 N, 504.43 E) Point CD2-4631-1-01_T03 0.00 0.00 4,026.00 5,705.62 560.69 5,979,871.33 372,087.48 70° 21' 11.721 N 151° 2' 19.264 W plan misses target center by 21.95usft at 9571.62usft MD (4005.65 TVD, 5712.87 N, 564.58 E) - Point CD2-463L1-01_T06 0.00 0.00 4,033.00 5,724.42 -503.86 5,979,908.37 371,023.50 70° 21' 11.906 N 151° 2' 50.380 W plan misses target center by 44.83usft at 10650.00usft MD (3992.54 TVD, 5741.52 N, -494.90 E) Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 10,650.00 3,992.54 2 3/8" 2.375 3.000 111112017 7.'31.33AM Page 5 COMPASS 5000.14 Build 85 0 ConocoPhillips Database: EDT Alaska Sandbox Company: Conoco Phillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-1-01 Design: CD2-4631-1-01_wp02 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: t W;HES a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 8,705.00 4,040.83 5,021.86 1,021.61 TIP/KOP 8,805.00 4,042.49 5,120.33 1,004.64 Start 7 dls 9,005.00 4,031.99 5,311.08 947.14 3 9,305.00 4,014.39 5,557.12 779.36 4 9,550.00 4,005.92 5,702.90 583.77 5 9,750.00 4,003.44 5,775.08 397.80 6 10,000.00 4,005.05 5,799.07 149.93 7 10,150.00 4,004.10 5,777.98 1.63 8 10,400.00 3,994.82 5,759.45 -246.53 9 10,650.00 3,992.54 5,741.52 -494.90 Planned TD at 10650.00 111112017 7.31.33AM Page 6 COMPASS 5000.14 Build 85 0 0 ConocoPhillips Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Reference Site: CD2 Alpine Pad Site Error: 0.00 usft Reference Well: CD2-463 Well Error: 0.00 usft Reference Wellbore CD2-4631_1-01 Reference Design: CD2-463L1-01_wp02 Baker Hughes INTEQ Travelling Cylinder Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: BA ER I UGHES a GE company Well CD2-463 CD2-463 @ 53.03usft (Doyon 19) CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum teference CD2-463L1-01_wp02 -iltertype: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA )epth Range: 8,705.00 to 10,650.00usft Scan Method: Tray. Cylinder North tesults Limited by: Maximum center -center distance of 1,261.27 usft Error Surface: Pedal Curve Survey Tool Program Date 10/31/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 81.00 447.00 CD2-463 Gyro (CD2-463) CB -GYRO -SS Camera based gyro single shot 474.54 8,529.01 CD2-463 MWD+SAG+CA+IIFR+MS (CD2 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 8,529.01 8,705.00 CD2-463L1_wp03(CD2-463L1) MWD MWD- Standard 8,705.00 10,650.00 CD2-463L1-01_wp02 (CD2-463L1-01) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 2,615.50 2,376.92 10-3/4" x 13-1/2" 10-3/4 13-1/2 5,148.60 4,076.09 7-5/8" x 9-7/8" 7-5/8 9-7/8 10,650.00 4,045.57 2 3/8" 2-3/8 3 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) CD2 Alpine Pad 2017 - 4 Prelim: CD2-118-A (FWK-4) - CD2-118-A Out of range 2017 - 4 Prelim: CD2-119-A (1XL) - CD2-119-A - C 8,808.74 7,350.00 566.83 168.74 428.57 Pass - Major Risk 2017 - 4 Prelim: CD2-120-A (301) - CD2-120-A - C Out of range 2017 - 4 Prelim: CD2-415 (103) - CD2-415 - CD24 Out of range 2017 - 4 Prelim: CD2-416 (117) - CD2-416 - CD2-4 Out of range 2017 - 4 Prelim: CD2-417 (1XM) - CD2-417 - CD2 8,710.72 7,625.00 955.12 162.31 795.94 Pass - Major Risk 2017 - 4 Prelim: CD2-418 (FWK-5) - CD2-418 - CD 8,730.77 7,250.00 389.27 159.92 244.31 Pass - Major Risk 2017 - 4 Prelim: CD2-419 (115) - CD2-419 - CD2-4 9,209.90 7,525.00 188.28 152.76 59.32 Pass - Major Risk 2017 - 4 Prelim: CD2-420 (116) - CD2-420 - CD2-4 9,694.97 7,700.00 168.68 121.22 60.23 Pass - Major Risk 2017 - 4 Prelim: CD2-421 (102) - CD2-421 - CD2- 9,895.54 7,575.00 430.37 110.31 328.95 Pass - Major Risk CD2-07 - CD2-07 - CD2-07 8,705.00 7,150.00 1,182.58 144.79 1,071.33 Pass - Major Risk CD2-07 - CD2-07PB1 - CD2-07PB1 8,705.00 7,150.00 1,182.58 144.79 1,071.33 Pass - Major Risk CD2-07 - CD2-07PB2 - CD2-07PB2 8,705.00 7,150.00 1,182.58 144.79 1,071.33 Pass - Major Risk CD2-10 - CD2-10 - CD2-10 8,705.00 6,825.00 898.13 148.17 777.77 Pass - Major Risk CD2-10 - CD2-10PB1 - CD2-10PB1 8,705.00 6,825.00 898.13 148.17 777.77 Pass - Major Risk CD2-16 - CD2-16 - CD2-16 Out of range CD2-16 - CD2-16 (Sag) - CD2-16 (Sag) Out of range CD2-17 - CD2-17A - CD2-17A Out of range CD2-28 - CD2-28 - CD2-28 Out of range CD2-463 - CD2-463 - CD2-463 8,975.04 8,975.00 8.52 20.67 -9.75 FAIL - Major Risk CD2-463 - CD2-463L1 - CD2-463L1_wp03 9,017.95 9,050.00 98.26 1.37 98.03 Pass - Minor 1110 CD2-465 - CD2-465 - CD2-465 10,061.91 7,625.00 554.71 113.55 446.39 Pass - Major Risk CD2-466 - CD2-466 - CD2-466 Out of range CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1013112017 10.27.42AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Project: Western North Slope Site: CD2 Alpine Pad Well: C132.463 Azimmhe to True Narlh Magnetic North: 15.94' M.pnelio Paid WELLBORE DETAILS: CD24631-1-01 REFERENCE INFORMATION Parent Wellbore: CD2-463L1 Coordinate(ME) Reference: Well CD2463, True NoNh Wellbore: CD2.463L1.01 Strength: 57443.8snT Dip Am[.: 80.81' Tie on MD: 8705.00 Vertical(ND) Reference: Mean Sea Level Section(VS)Reference: Slot - (0.00N, O.00E) Plan:CD2.463L1-01 w 02 CD2463/CD2.463L1-01 _ P ( ) oale:211/2018 Model: BGGM2017 Measured Depth Reference: CD2463@53.03usft(Doyon19) Calculation Method: Minimum Curvature WELL DETAILS: CD2-463 +N/-S +E/-W Northing Easting Latitude Longitude 0.00 0.00 5974176.62 371429.10 70e 20' 15.607 N 151' 2' 35.652 W Sec MD Inc Azi TVDSS +N/-S +E/-W Dleg TFace VSect Annotation 1 8705.00 85.55 350.22 4040.83 5021.86 1021.61 0.00 0.00 1626.19 TIP/KOP 2 8805.00 92.55 350.22 4042.49 5120.33 1004.64 7.00 0.00 1690.12 Start 7 dls 3 9005.00 93.44 336.23 4031.99 5311.08 947.14 7.00 -86.00 1835.29 3 4 9305.00 93.21 315.19 4014.39 5557.12 779.36 7.00 -90.00 2103.62 4 5 9550.00 90.72 298.21 4005.92 5702.90 583.77 7.00 -98.00 2345.89 5 6 9750.00 90.70 284.21 4003.44 5775.08 397.80 7.00 -90,00 2543.04 6 7 10000.00 88.57 266.84 4005.05 5799.07 149.93 7.00 -97.00 2769.69 7 810150.00 92.16 256.97 4004.10 5777.98 1.63 7.00 -70.00 2887.58 8 910400.00 92.06 274.49 3994.82 5759.45 -246.53 7.00 90.00 3093.23 9 10 10650.00 88.98 257.26 3992.54 5741.52 -494.90 7.00 -100.00 3299.36 Planned TD at 10650.00 q : Mean E 700C 680C 660C 640C 620C 6000 580C N �s6oc 540c 7o 9 5200 12, 5000 coo 4800 4600 4400 4200 BA CER I�UGHES a GE mmpany I■■! "EMEMI IRI■■■■■■■■■■ I■■■■■■■■■O■■■■■■■■■ ■U1i�i_ls■����1CI./.I■■■■■■ O S O O O O O O O O O O O O O O O O O O O O O West( -)/East(+) (200 usftlin) 3400 3500 3600 [•+l FI FI I a 3700 'O iii 3800 N A A A i Plane TDa 1065000 3900 CD 3/CD 463L -01 4000 4100 D24 3/CD -463 /KO I 3 4 4200 Start'7 dls D24 3/CD2 63 4300 4400 ea L ve N O O O O O O O O O O O O O O O O O O u N O O O O W A O O O O U O\ J O O O O O O u O O b O O O O O O O O O W A U O O O O O O P V O O O O O O b O O O O O N O O O O W O O A W W W O O O Oo O O O W 0 b o O S Vertical Section at 300.00' (100 usft/in) 1 0 0 0 ConocoPhillips ConocoPhillips(Alaska) Inc. -WNS Western North Slope CD2 Alpine Pad CD2-463 CD2-463L2 Plan: CD2-463L2 wp02 Standard Planning Report 01 November, 2017 BER BA 0 GE company 0 0 ConocoPhillips BAT (ER ConocoPhillips Planning Report UGHES a Glicompany Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well CD2-463 Company: ConocoPhiIli ps(Alaska) Inc. -WNS TVD Reference: Mean Sea Level Project: Western North Slope MD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad North Reference: True Well: CD2-463 Survey Calculation Method: Minimum Curvature Wellbore: CD2-46312 Design: CD2-463L2_wp02 Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD2 Alpine Pad Site Position: Northing: 5,974,641.66 usft Latitude: 70° 20' 20.225 N From: Map Easting: 371,696.24usft Longitude: 151° 2' 28.083 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: -0,98 ° Well CD2-463 Well Position +N/-S 0.00 usft Northing: 5,974,176.62 usft Latitude: 70° 20' 15.607 N +E/-W 0.00 usft Easting: 371,429.10 usft Longitude: 151° 2' 35.652 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 15.70 usft Wellbore CD2-4631-2 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) (1) (nT) BGGM2017 2/1/2018 16.84 80.81 57,444 Design CD2-463L2_wp02 Audit Notes: Version: Phase: PLAN Tie On Depth: 5,118.26 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) -15.70 0.00 0.00 270.00 111112017 7.34:32AM Page 2 COMPASS 5000.14 Build 85 a � ConocoPhillips BA�(ER ConocoPhillips Planning Report UGHES a GE company Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well CD2-463 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Mean Sea Level Project: Western North Slope MD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad North Reference: True Well: CD2-463 Survey Calculation Method: Minimum Curvature Wellbore: CD2-4631-2 Design: CD2-463L2_wp02 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100ft) (°/100ft) (°/100ft) (°) Target 5,118.26 84.58 352.99 4,020.35 1,493.39 1,630.23 0.00 0.00 0.00 0.00 5,193.14 86.08 354.52 4,026.45 1,567.57 1,622.11 2.86 2.00 2.04 45.54 5,214.14 83.14 354.52 4,028.42 1,588.38 1,620.12 14.00 -14.00 0.00 -180.00 5,244.14 79.97 351.29 4,032.83 1,617.82 1,616.45 15.00 -10.57 -10.77 -135.00 5,274.14 80.00 346.72 4,038.05 1,646.82 1,610.82 15.00 0.10 -15.23 -90.00 5,304.14 83.20 343.52 4,042.43 1,675.49 1,603.20 15.00 10.65 -10.68 -45.00 5,475.00 96.20 321.38 4,043.34 1,825.70 1,524.81 15.00 7.61 -12.96 -60.00 5,600.00 95.23 302.56 4,030.79 1,908.49 1,432.75 15.00 -0.78 -15.06 -92.00 5,710.00 92.19 286.31 4,023.63 1,953.72 1,333.16 15.00 -2.76 -14.78 -100.00 5,800.00 90.73 272.88 4,021.32 1,968.68 1,244.65 15.00 -1.62 -14.92 -96.00 6,100.00 90.52 227.88 4,017.88 1,870.52 969.29 15.00 -0.07 -15.00 -90.00 6,225.00 89.85 209.14 4,017.47 1,773.15 891.80 15.00 -0.54 -14.99 -92.00 6,425.00 89.37 239.14 4,018.88 1,631.26 754.11 15.00 -0.24 15.00 91.00 6,590.00 91.52 263.80 4,017.58 1,579.22 598.89 15.00 1.30 14.94 85.00 6,740.00 88.35 241.52 4,017.76 1,534.80 456.62 15.00 -2.11 -14.85 -98.00 6,940.00 88.07 271.53 4,024.15 1,488.75 264.44 15.00 -0.14 15.01 91.00 7,100.00 90.27 247.63 4,026.51 1,460.02 108.25 15.00 1.37 -14.94 -85.00 7,300.00 91.23 277.62 4,023.83 1,434.63 -87.82 15.00 0.48 14.99 88.00 7,450.00 90.37 255.13 4,021.70 1,425.20 -236.54 15.00 -0.57 -14.99 -92.00 7,650.00 90.32 285.13 4,020.45 1,425.65 -434.26 15.00 -0.03 15.00 90.00 111112017 7.34:32AM Page 3 COMPASS 5000.14 Build 85 0 ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-4631-2 Design: CD2-463L2_wp02 BA ER F IGHES BAT GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100ft) (°) (usft) (usft) 5,118.26 84.58 352.99 4,020.35 1,493.39 1,630.23 -1,630.23 0.00 0.00 5,975,641.72 373,084.56 TIP 5,193.14 86.08 354.52 4,026.45 1,567.57 1,622.11 -1,622.11 2.86 45.54 5,975,716.03 373,077.72 KOP 5,200.00 85.12 354.52 4,026.97 1,574.38 1,621.46 -1,621.46 14.00 -180.00 5,975,722.84 373,077.18 5,214,14 83.14 354.52 4,028.42 1,588.38 1,620.12 -1,620.12 14.00 -180.00 5,975,736.86 373,076.08 End 14 dis, Start 15 dis 5,244.14 79.97 351.29 4,032.83 1,617.82 1,616.45 -1,616.45 15.00 -135.00 5,975,766.36 373,072.92 4 5,274.14 80.00 346.72 4,038.05 1,646.82 1,610.82 -1,610.82 15.00 -90.00 5,975,795.44 373,067.79 5 5,300.00 82.75 343.96 4,041.92 1,671.55 1,604.35 -1,604.35 15.00 -45.00 5,975,820.28 373,061.74 5,304.14 83.20 343.52 4,042.43 1,675.49 1,603.20 -1,603.20 15.00 -44.59 5,975,824.24 373,060.66 6 5,400.00 90.49 331.10 4,047.72 1,763.55 1,566.34 -1,566.34 15.00 -60.00 5,975,912.91 373,025.32 5,475.00 96,20 321.38 4,043.34 1,825.70 1,524.81 -1,524.81 15.00 -59.31 5,975,975.77 372,984.87 7 5,500.00 96.05 317.61 4,040.67 1,844.60 1,508.67 -1,508.67 15.00 -92.00 5,975,994.94 372,969.05 5,600.00 95.23 302.56 4,030.79 1,908.49 1,432.75 -1,432.75 15.00 -92.40 5,976,060.11 372,894.25 8 5,700.00 92.48 287.78 4,024.04 1,950.79 1,342.71 -1,342.71 15.00 -100.00 5,976,103.94 372,804.95 5,710.00 92.19 286.31 4,023.63 1,953.72 1,333.16 -1,333.16 15.00 -101.00 5,976,107.04 372,795.45 9 5,800.00 90.73 272.88 4,021.32 1,968.68 1,244.65 -1,244.65 15.00 -96.00 5,976,123.51 372,707.22 10 5,900.00 90.71 257.88 4,020.06 1,960.65 1,145.27 -1,145.27 15.00 -90.00 5,976,117.19 372,607.72 6,000.00 90.63 242.88 4,018.89 1,927.17 1,051.35 -1,051.35 15.00 -90.19 5,976,085.33 372,513.25 6,100.00 90.52 227.88 4,017.88 1,870.52 969.29 -969.29 15.00 -90.37 5,976,030.10 372,430.24 11 6,200.00 89.98 212.89 4,017.44 1,794.57 904.68 -904.68 15.00 -92.00 5,975,955.27 372,364.35 6,225.00 89.85 209.14 4,017.47 1,773.15 891.80 -891.80 15.00 -92.07 5,975,934.08 372,351.10 12 6,300.00 89.65 220.39 4,017.80 1,711.64 849.11 -849.11 15.00 91.00 5,975,873.31 372,307.36 6,400.00 89.42 235.39 4,018.61 1,644.78 775.14 -775.14 15.00 90.95 5,975,807.73 372,232.26 6,425.00 89.37 239.14 4,018.88 1,631.26 754.11 -754.11 15.00 90.83 5,975,794.58 372,211.01 13 6.500.00 90.35 250.35 4,019.06 1,599.31 686.39 -686.39 15.00 85.00 5,975,763.80 372,142.75 6,590.00 91.52 263.80 4,017.58 1,579.22 598.89 -598.89 15.00 84.97 5,975,745.21 372,054.92 14 6,600.00 91.31 262.31 4,017.34 1,578.01 588.96 -588.96 15.00 -98.00 5,975,744.18 372,044.98 6,700.00 89.19 247.46 4,016.90 1,552.01 492.70 -492.70 15.00 -98.04 5,975,719.83 371,948.29 6,740.00 88.35 241.52 4,017.76 1,534.80 456.62 -456.62 15.00 -98.10 5,975,703.24 371,911.93 15 6,800.00 88.21 250.52 4,019.56 1,510.45 401.88 -401.88 15.00 91.00 5,975,679.84 371,856.79 6,900.00 88.09 265.53 4,022.81 1,489.77 304.39 -304.39 15.00 90.73 5,975,660.83 371,758.96 6,940.00 88.07 271.53 4.024.15 1,488.75 264.44 -264.44 15.00 90.24 5,975,660.50 371,719.01 16 7,000.00 88.88 262.57 4,025.75 1,485.66 204.61 -204.61 15.00 -85.00 5,975,658.44 371,659.13 7,100.00 90.27 247.63 4,026.51 1,460.02 108.25 -108.25 15.00 -84.76 5,975,634.45 371,562.35 17 7,200.00 90.78 262.62 4,025.59 1,434.42 11.88 -11.88 15.00 88.00 5,975,610.51 371,465.57 7,300.00 91.23 277.62 4,023.83 1,434.63 -87.82 87.82 15.00 88.14 5,975,612.43 371,365.90 11/1/2017 7.34:32AM Page 4 COMPASS 5000.14 Build 85 • ConocoPhillips Database: EDT Alaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-2 Design: CD2-463L2_wp02 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: BAI- IGHES a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (') (') (usft) (usft) (usft) (usft) (°/100ft) (1) (usft) (usft) 18 7,400.00 90.67 262.63 4,022.15 1,434.84 -187.52 187.52 15.00 -92.00 5,975,614.35 371,266.22 7,450.00 90.37 255.13 4,021.70 1,425.20 -236.54 236.54 15.00 -92.25 5,975,605.55 371,217.04 19 7,500.00 90.37 262.63 4,021.37 1,415.57 -285.57 285.57 15.00 90.00 5,975,596.76 371,167.86 7,600.00 90.34 277.63 4,020.74 1,415.79 -385.28 385.28 15.00 90.05 5,975,598.70 371,068.18 7,650.00 90.32 285.13 4,020.45 1,425.65 -434.26 434.26 15.00 90.14 5,975,609.39 371,019.38 Planned TD at 7650.00 111112017 7:34:32AM Page 5 COMPASS 5000.14 Build 85 0 0 ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-463L2 Design: CD2-463L2_wp02 Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Shape V) (1) (usft) (usft) (usft) (usft) CD2-463 T7 0.00 0.00 4,018.00 1,553.87 983.78 5,975,713.27 plan misses target center by 206.62usft at 6305.90usft MD (4017.84 TVD, 1707.17 N, 845.25 E) Point CD2-463L2_T04 0.00 0.00 4,019.00 1,589.26 655.11 5,975,754.28 plan misses target center by 0.44usft at 6532.81 usft MD (4018.73 TVD, 1589.61 N, 655.06 E) Point CD2-4631-2_T02 0.00 0.00 4,023.00 1,959.56 1,310.91 5,976,113.26 plan misses target center by 0.19usft at 5732.97usft MD (4022.82 TVD, 1959.50 N, 1310.95 E) Point CD2-4631-2 T01 0.00 0.00 4,048.00 1,755.95 1,570.45 5,975,905.25 plan misses target center by 0.26usft at 5391.41 usft MD (4047.75 TVD, 1755.99 N, 1570.42 E) Point CD2-463 T12 0.00 0.00 4,020.00 1,410.68 429.07 5,975,594.33 plan misses target center by 13.23usft at 7641.95usft MD (4020.50 TVD, 1423.63 N,-426.47 E) Point CD2-4631-2_T06 0.00 0.00 4,021.00 1,413.85-302.10 5,975,595.33 plan misses target center by 0.27usft at 7516.57usft MD (4021.27 TVD, 1413.80 N,-302.05 E) Point CD2-463 T8 0.00 0.00 4,020.00 1,534.78 803.07 5,975,697.28 plan misses target center by 108.20usft at 6425.00usft MD (4018.88 TVD, 1631.26 N, 754.11 E) Point CD2-4631-2_T03 0.00 0.00 4,018.00 1,687.21 826.47 5,975,849.28 plan misses target center by 0.06usft at 6333.27usft MD (4018.03 TVD, 1687.27 N, 826.47 E) Point CD2-463 T10 0.00 0.00 4,026.00 1,466.10 121.10 5,975,640.31 plan misses target center by 1.14usft at 7085.97usft MD (4026.55 TVD, 1465.12 N, 121.31 E) Point CD2-4631-1 CTD Polygo 0.00 0.00 0.00 5,327.65 1,152.28 5,979,483.30 plan misses target center by 5240.45usft at 5800.00usft MD (4021.32 TVD, 1968.68 N, 1244.65 E) Polygon Point 1 0.00 0.00 0.00 5,979,483.30 Point 2 0.00 316.77 156.59 5,979,797.31 Point 3 0.00 448.42 309.36 5,979,926.31 Point4 0.00 551.80 678.67 5,980,023.33 Point 5 0.00 555.08 869.65 5,980,023.34 Point 0.00 632.27 1,286.42 5,980,093.37 Point? 0.00 752.98 1,442.38 5,980,211.38 Point 0.00 814.04 1,154.27 5,980,277.36 Point 0.00 768.41 1,002.02 5,980,234.35 Point 10 0.00 767.46 597.94 5,980,240.33 Point 11 0.00 745.07 401.28 5,980,221.32 Point 12 0.00 569.89 44.21 5,980,052.30 Point 13 0.00 369.24-107.37 5,979,854.29 Point 14 0.00 0.00 0.00 5,979,483.30 CD2-4631-2_T05 0.00 0.00 4,026.00 1,459.88 108.20 5,975,634.31 plan misses target center by 0.52usft at 7100.08usft MD (4026.51 TVD, 1459.99 N, 108.17 E) Point CD2-4631-2-01 CTD Pol, 0.00 0.00 0.00 1,957.04 1,455.99 5,976,108.25 plan misses target center by 4025.51 usft at 5710.00usft MD (4023.63 TVD, 1953.72 N, 1333.16 E) Polygon Point 1 0.00 0.00 0.00 5,976,108.25 Point 2 0.00 332.82 -14.73 5,976,441.25 BAI- IGHES a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Easting (usft) Latitude Longitude 372,439.30 70' 20' 30.888 N 151' 2' 6.913 W 372,111.31 70' 20' 31.237 N 151' 2' 16.515 W 372,773.31 70° 20' 34.878 N 151° 1' 57.355 W 373,029.30 70° 20' 32.875 N 151' 1' 49.774 W 371,024.31 70° 20' 29.480 N 151' 2' 48.186 W 371,151.31 70' 20' 29.512 N 151' 2' 44.477 W 372,258.30 70' 20' 30.701 N 151- 2' 12.192 W 372,284.31 70° 20' 32.200 N 151' 2' 11.508 W 371,575.31 70' 20' 30.026 N 151' 2' 32.115 W 372,672.45 70' 21' 8.003 N 151 ° 2' 1.974 W 372,672.45 372,834.44 372,989.43 373, 360.43 373, 551.42 373, 969.42 374,127.41 373,840.42 373,687.42 373,283.42 373,086.42 372,726.42 372, 571.44 372,672.45 371,562.31 70' 20' 29.964 N 151 ° 2' 32.491 W 372,918.31 70° 20' 34.853 N 151- 1' 53.117 W 372, 918.31 11/1/2017 7.,34:32AM Page 6 COMPASS 5000.14 Build 85 n 9 ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-463L2 Design: CD2-463L2_wp02 BA ER BAT a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Point 3 0.00 482.70 150.73 5,976,588.26 373,077.28 Point 0.00 554.17 351.55 5,976,656.27 373,279.28 Point 5 0.00 538.87 566.86 5,976,637.28 373,494.28 Point 0.00 336.88 1,209.48 5,976,424.32 374,133.29 Point 0.00 287.15 1,633.44 5,976,367.33 374,556.30 Point 8 0.00 337.73 1,840.61 5,976,414.35 374,764.29 Point 0.00 97.21 1,929.77 5,976,172.36 374,849.31 Point 10 0.00 24.62 1,663.96 5,976,104.34 374,582.31 Point 11 0.00 49.09 993.38 5,976,140.30 373,912.30 Point 12 0.00 295.34 365.00 5,976,397.27 373,288.29 Point 13 0.00 -59.04 173.05 5,976,046.26 373,090.31 Point 14 0.00 0.00 0.00 5,976,108.25 372,918.31 CD2-4631-1-01 CTD Poll 0.00 0.00 0.00 5,618.20 888.25 5,979,778.31 372,413.47 70° 21' 10.861 N plan misses target center by 5441.01 usft at 5900.00usft MD (4020.06 TVD, 1960.65 N, 1145.27 E) Polygon Point 1 0.00 0.00 0.00 5,979,778.31 372,413.47 Point 0.00 196.05 -232.42 5,979,978.30 372,184.46 Point 3 0.00 282.07 -464.96 5,980,068.29 371,953.45 Point 0.00 314.89 -708.58 5,980,105.28 371,710.45 Points 0.00 223.21 -1,619.21 5,980,029.23 370,798.46 Point 0.00 -36.74 -1,554.72 5,979,768.23 370,858.48 Point 0.00 -11.37 -1,359.12 5,979,790.24 371,054.47 Point 0.00 19.37 -734.50 5,979,810.27 371,679.47 Point 0.00 -58.27 -422.09 5,979,727.29 371,990.48 Point 10 0.00 -152.10 -294.45 5,979,631.29 372,116.48 Point 11 0.00 -274.48 -140.31 5,979,506.30 372,268.49 Point 12 0.00 -523.70 -34.00 5,979,255.31 372,370.50 Point 13 0.00 -630.35 -12.16 5,979,148.31 372,390.51 Point 14 0.00 0.00 0.00 5,979,778.31 372,413.47 CD2-463 T11 0.00 0.00 4,020.00 1,418.99-352.20 5,975,601.33 plan misses target center by 6.24usft at 7566.83usft MD (4020.95 TVD, 1412.82 N,-352.26 E) Point CD2-4631-2 CTD Polygo 0.00 0.00 0.00 2,050.93 1,506.39 5,976,201.25 plan misses target center by 4028.53usft at 5710.00usft MD (4023.63 TVD, 1953.72 N, 1333.16 E) Polygon Point 1 0.00 0.00 0.00 5,976,201.25 Point 2 0.00 87.56 -375.59 5,976,295.23 Point 0.00 -36.90 -691.52 5,976,176.22 Point 0.00 -199.76 -855.76 5,976,016.21 Point 5 0.00 -330.31 -1,176.59 5,975,891.19 Point 6 0.00 -417.97 -2,086.29 5,975,819.15 Point 7 0.00 -796.38 -2,046.77 5,975,440.14 Point 0.00 -792.86 -1,667.75 5,975,437.17 Point 9 0.00 -660.20 -874.85 5,975,556.20 Point 10 0.00 -480.39 -539.86 5,975,730.23 Point 11 0.00 -322.12 -351.54 5,975,885.23 Point 12 0.00 -318.94 -166.55 5,975,885.24 Point 13 0.00 -529.21 -4.90 5,975,672.25 Point 14 0.00 0.00 0.00 5,976,201.25 CD2-463 T6 0.00 0.00 4,024.00 1,607.05 1,519.99 5,975,757.25 plan misses target center by 97.46usft at 5250.31 usft MD (4033.90 TVD, 1623.82 N, 1615.48 E) Point CD2-463 T9 0.00 0.00 4,017.00 1,515.36 603.36 5,975,681.29 plan misses target center by 63.97usft at 6593.29usft MD (4017.50 TVD, 1578.85 N, 595.61 E) Point CD2-4631-2_T07 0.00 0.00 4,020.00 1,425.59-434.33 5,975,609.33 plan misses target center by 0.46usft at 7650.00usft MD (4020.45 TVD, 1425.65 N, -434.26 E) Point i&IF&IIFI:RUITiU 371,101.31 70° 20' 29.562 N 151' 2' 45.941 W 372,970.31 70° 20' 35.776 N 151' V S1.644 W 372,970.31 372, 596.31 372,278.32 372,111.32 371,788.33 370,877.33 370, 910.36 371,289.35 372,084.34 372,422.34 372,613.33 372,798.33 372, 956.34 372, 970.31 372,976.29 70° 20' 31.410 N 151' 1' 51.249 W 372,058.30 70° 20' 30.510 N 151 ° 2' 18.027 W 371,019.31 70° 20' 29.627 N 151' 2' 48.340 W 111112017 7:34:32AM Page 7 COMPASS 5000.14 Build 85 ConocoPhillips Database: EDTAlaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-46312 Design: CD2-463L2_wp02 ConocoPhillips AT Planning Report EUERGHES a U company Local Co-ordinate Reference: Well CD2-463 TVD Reference: Mean Sea Level MD Reference: CD2-463 @ 53.03usft (Doyon 19) North Reference: True Survey Calculation Method: Minimum Curvature Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 5,148.60 4,023.06 7-5/8" x 9-718" 7.625 9.875 7,650.00 4,020.45 2 3/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/-S +E/-W (usft) (usft) (usft) (usft) Comment 5,118.26 4,020.35 1,493.39 1,630.23 TIP 5,193.14 4,026.45 1,567.57 1,622.11 KOP 5,214.14 4,028.42 1,588.38 1,620.12 End 14 dls, Start 15 dls 5,244.14 4,032.83 1,617.82 1,616.45 4 5,274.14 4,038.05 1,646.82 1,610.82 5 5,304.14 4,042.43 1,675.49 1,603.20 6 5,475.00 4,043.34 1,825,70 1,524.81 7 5,600.00 4,030.79 1,908.49 1,432.75 8 5,710.00 4,023.63 1,953.72 1,333.16 9 5,800.00 4,021.32 1,968.68 1,244.65 10 6,100.00 4,017.88 1,870.52 969.29 11 6,225.00 4,017.47 1,773.15 891.80 12 6,425.00 4,018.88 1,631.26 754.11 13 6,590.00 4,017.58 1,579.22 598.89 14 6,740.00 4,017.76 1,534.80 456.62 15 6,940.00 4,024.15 1,488.75 264.44 16 7,100.00 4,026.51 1,460.02 108.25 17 7,300.00 4,023.83 1,434.63 -87.82 18 7,450.00 4,021.70 1,425.20 -236.54 19 7,650.00 4,020.45 1,425.65 -434.26 Planned TD at 7650.00 111112017 7:34:32AM Page 8 COMPASS 5000.14 Build 85 10 0 Baker Hughes INTEQ ConocoPhillips Travelling Cylinder Report Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Reference Site: CD2 Alpine Pad Site Error: 0.00 usft Reference Well: CD2-463 Well Error: 0.00 usft Reference Wellbore CD2-463L2 Reference Design: CD2-463L2_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: BA ER BAT a GE company Well CD2-463 CD2-463 @ 53.03usft (Doyon 19) CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference CD2-463L2_wp02 -filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference nterpolation Method: MD Interval 25.O0usft Error Model: ISCWSA )epth Range: 5,118.26 to 7,650.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 961.27 usft Error Surface: Pedal Curve Survey Tool Program Date 10/31/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 81.00 447.00 CD2-463 Gyro (CD2-463) CB -GYRO -SS Camera based gyro single shot 474.54 5,118.26 CD2-463 MWD+SAG+CA+IIFR+MS (CD2 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5,118.26 7,650.00 CD2-463L2_wp02(CD2-463L2) MWD MWD- Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name 2,615.50 2,376.92 10-3/4" x 13-1/2" 10-3/4 13-1/2 5,148.60 4,076.09 7-5/8" x 9-718" 7-5/8 9-7/8 7,650.00 4,073.48 2 3/8" 2-3/8 3 Summary Site Name Offset Well - Wellbore - Design CD2 Alpine Pad 2017 - 4 Prelim: CD2-118-A (FWK-4) - CD2-118-A 2017 - 4 Prelim: CD2-119-A (1XL) - CD2-119-A- C 2017 - 4 Prelim: CD2-120-A (301) - CD2-120-A - C 2017 - 4 Prelim: CD2-461 (302) - CD2-461 - CD2-4 2017 -4 Prelim: CD2-461 (302) - CD2-461PB1 v1 2017 - 4 Prelim: CD2-462 (120) - CD2-462 - CD2-4 2017 - 4 Prelim: CD2-471 (305) - CD2-471 - CD2-4 CD2-12 - CD2-12 - CD2-12 CD2-14 - CD2-14 - CD2-14 CD2-16 - CD2-16 - CD2-16 CD2-16 - CD2-16 (Sag) - CD2-16 (Sag) CD2-17 - CD2-17 - CD2-17 CD2-17 - CD2-17A- CD2-17A CD2-19 - CD2-19 - CD2-19 CD2-21 - CD2-21 - CD2-21 CD2-21 -CD2-21PB1 -CD2-21PB1 CD2-22 - CD2-22 - CD2-22 CD2-23 - CD2-23 - CD2-23 CD2-23 - CD2-23PB1 - CD2-23PB1 CD2-24 - CD2-24 - CD2-24 CD2-24 - CD2-24PB1 - CD2-24PB1 CD2-25 - CD2-25 - CD2-25 CD2-26 - CD2-26 - CD2-26 CD2-28 - CD2-28 - CD2-28 CD2-28 - CD2-28PB1 - CD2-28PB1 Reference Offset Centre to Measured Measured Centre Depth Depth Distance (usft) (usft) (usft) 6,550.00 4,200.00 761.47 6,550.00 4,300.00 933.68 6,550.00 4,300.00 933.68 No -Go Allowable Distance Deviation Warning (usft) from Plan (usft) Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 108.88 652.66 Pass - Major Risk Out of range Out of range 110.08 823.95 Pass - Major Risk 110.10 823.93 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range nii+ nfrana CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1013112017 11:13:17AM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Project: Western North Slope Site: CD2 Alpine Pad Azimuth, to True North Magaetic North: 16.84' Mag�eOc Field WELLBORE DETAILS: CD2-463L2 REFERENCE INFORMATION Parent Wellbore: CD2 463 Co-ordinate (WE) Reference: Well CD2-063,T ue North Well: CD2-463 Strength: 57443.8enT Tie on MD: 5118.26 Vertical(TVD) Reference: Mean See Level Wellbore: CD2-463L2 Dig An91e� 80,81• Section (VS) Reference: Slot-(O.00N, O.00E) Plan: CD2.463L2_w 02 CD2.463/CD2-463L2 P ( ) Date: 211=18 Model: BGGM2017 Measured Depth Reference: CD2-063@ 53.03usff(Doyon 19) Calculation Method: Minimum Curvature WELL DETAILS: CD2-463 +N/-S +E/-W Northing Easting Latitude Longitude 0.00 0.00 5974176.62 371429.10 70' 20' 15.607 N 151 ° 2' 35.652 W Sec MD Inc Azi TVDSS +N/-S +E/-W Meg TFace VSect Annotation 1 5118.26 84.58 352.99 4020.35 1493.39 1630.23 0.00 0.00 -1630.23 TIP 2 5193.14 86.08 354.52 4026.45 1567.57 1622.11 2.86 45.54 -1622.11 KOP 3 5214.14 83.14 354.52 4028.42 1588.38 1620.12 14.00 -180.00 -1620.12 End 14 d1s, Start 15 dls 4 5244.14 79.97 351.29 4032.83 1617.82 1616.45 15.00 -135.00 -1616.45 4 5 5274.14 80.00 346.72 4038.05 1646.82 1610.82 15.00 -90.00 -1610.82 5 6 5304.14 83.20 343.52 4042.43 1675.49 1603.20 15.00 -45.00 -1603.20 6 7 5475.00 96.20 321.38 4043.34 1825.70 1524.81 15.00 -60.00 -1524.81 7 8 5600.00 95.23 302.56 4030.79 1908.49 1432.75 15.00 -92.00 -1432.76 8 9 5710.00 92.19 286.31 4023.63 1953.72 1333.16 15.00 -100.00 -1333.16 9 10 5800.00 90.73 272.88 4021.32 1968.68 1244.65 15.00 -96.00 -1244.65 10 11 6100.00 90.52 227.88 4017.88 1870.52 969.29 15.00 -90.00 -969.29 11 12 6225.00 89.85 209.14 4017.47 1773.15 891.80 15.00 -92.00 -891.80 12 13 6425.00 89.37 239.14 4018.88 1631.26 754.11 15.00 91.00 -754.11 13 14 6590.00 91.52 263.80 4017.58 1579.22 598.89 15.00 85.00 -598.89 14 15 6740.00 88.35 241.52 4017.76 1534.80 456.62 15.00 -98.00 -456.62 15 16 6940.00 88.07 271.53 4024.15 1488.75 264.44 15.00 91.00 -264.44 16 17 7100.00 90.27 247.63 4026.51 1460.02 108.25 15.00 -85.00 -108.25 17 18 7300.00 91.23 277.62 4023.83 1434.63 -87.82 15.00 88.00 87.82 18 19 7450.00 90.37 255.13 4021.70 1425.20 -236.54 15.00 -92.00 236.54 19 20 7650.00 90.32 285.13 4020.45 1425.65 -434.26 15.00 90.00 434.26 Planned TD at 7650.00 : d) Mean S BA CER I-IUGHES a GEcompany ■■■N■MEMEMEM a 4 4 M■E■I RAMEM■■■■■I, r,■■■■■■■ NERINI m- MIN 4 4 ■ a EREMM■■IAM■ ' MEMM■I West( -)/East(+) (250 usft/in) 1400 lsoo 1600 F o o ry� 170o a e e N A ❑❑N U A 1800 D2-4 3/CD 63L I 5900 21463 ICD2-1 63 CD24 3/CD 463L -01 !r463J D2.4 3L2-0 KO ` ! I t t000 1100 nd 14 ills, Stait 15 dl I 4 5 9 8 9 10 11 12 13 14 15 16 7 18 19 Pr9nac, I TD al 7650. 1200 CD /CD -463L 1300 1400 ea L �J O O O O O O o O o O O O O O O O OO 8 O pA O O O O O O O O O O O O O O O O O O O O O O O O O O O o Vertical Section at 270.001(100 usft/in) W A to O O O O O O 0 r� ConocoPhillips ConocoPhill ips(Alaska) Inc. MNS Western North Slope CD2 Alpine Pad CD2-463 C132-4631-2-01 Plan: CD2-463L2-01 wp02 Standard Planning Report 01 November, 2017 BER T' GHES GE company ConocoPhillips Database: EDT Alaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-2-01 Design: CD2-463L2-01_wp02 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: BA ER BAT a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site CD2 Alpine Pad Site Position: Northing: 5,974,641.66 usft Latitude: 70° 20' 20.225 N From: Map Easting: 371,696.24usft Longitude: 151° 2' 28.083 W Position Uncertainty: 0.00 usft Slot Radius: 0.000 in Grid Convergence: -0.98 Well CD2-463 Well Position +N/-S 0.00 usft Northing: 5,974,176.62 usft Latitude: 70° 20' 15.607 N +E/-W 0.00 usft Easting: 371,429.10 usft Longitude: 151° 2' 35.652 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 15.70 usft Wellbore CD2-4631-2-01 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2017 2/1/2018 16.84 80.81 57,444 Design CD2-463L2-01_wp02 Audit Notes: Version: Phase: PLAN Tie On Depth: 5,400.00 Vertical Section: Depth From (TVD) +N/-S +E/-W Direction (usft) (usft) (usft) (°) -15.70 0.00 0,00 90.00 L-------- --- Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/-S +E/-W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100ft) (°/100ft) (°/100ft) (°) Target 5,400.00 90.49 331.10 4,047.72 1,763.55 1,566.34 0.00 0.00 0.00 0.00 5,430.00 94.99 331.10 4,046.29 1,789.77 1,551.86 15.00 15.00 0.00 0.00 5,460.00 98.16 334.31 4,042.85 1,816.25 1,538.19 15.00 10.58 10.71 45.00 5,490.00 98.14 338.86 4,038.60 1,843.49 1,526.39 15.00 -0.08 15.15 90.00 5,570.00 89.59 347.31 4,033.20 1,919.73 1,503.24 15.00 -10.68 10.57 135.00 5,870.00 89.71 32.31 4,035.11 2,207.79 1,553.06 15.00 0.04 15.00 90.00 6,200.00 93.61 81.69 4,024.90 2,382.02 1,821.08 15.00 1.18 14.96 85.00 6,475.00 90.08 122.82 4,015.62 2,324.84 2,083.87 15.00 -1.28 14.96 94.00 6,675.00 90.07 92.82 4,015.34 2,264.34 2,272.11 15.00 -0.01 -15.00 -90.00 6,900.00 90.06 126.57 4,015.07 2,189.61 2,480.90 15.00 -0.01 15.00 90.00 7,050.00 90.06 104.07 4,014.91 2,125.87 2,615.62 15.00 0.00 -15.00 -90.00 7,200.00 89.29 81.58 4,015.78 2.118.53 2,764.48 15.00 -0.51 -14.99 -92.00 7,375.00 89.36 107.83 4,017.89 2,104.30 2,937.35 15.00 0.04 15.00 90.00 7,700.00 89.58 59.08 4,021.09 2,140.23 3,250.57 15.00 0.07 -15.00 -90.00 111112017 7.36:45AM Page 2 COMPASS 5000.14 Build 85 • y. ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: Conoco Phillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-4631-2-01 Design: CD2-463L2-01_wp02 11 BAf-1 ES aER GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/-S +E/-W Section Rate Azimuth Northing Easting (usft) (°) (°) (usft) (usft) (usft) (usft) (°/10oft) (°) (usft) (usft) 5,400.00 90.49 331.10 4,047.72 1,763.55 1,566.34 1,566.34 0.00 0.00 5,975,912.91 373,025.32 TIP/KOP 5,430.00 94.99 331.10 4,046.29 1,789.77 1,551.86 1,551.86 15.00 0.00 5,975,939.38 373,011.29 Start 15 dls 5,460.00 98.16 334.31 4,042.85 1,816.25 1,538.19 1.538.19 15.00 45.00 5,975,966.08 372,998.08 3 5,490.00 98.14 338.86 4,038.60 1,843.49 1,526.39 1,526.39 15.00 90.00 5,975,993.52 372,986.75 4 5,500.00 97.08 339.93 4,037.27 1,852.77 1,522.91 1,522.91 15.00 135.00 5,976,002.86 372,983.42 5,570.00 89.59 347.31 4,033.20 1,919.73 1,503.24 1,503.24 15.00 135.14 5,976,070.14 372,964.91 5 5,600.00 89.60 351.81 4,033.41 1,949.22 1,497.81 1,497.81 15.00 90.00 5,976,099.72 372,959.98 5,700.00 89.62 6.81 4,034.10 2,048.93 1,496.61 1,496.61 15.00 89.97 5,976,199.42 372,960.50 5,800.00 89.67 21.81 4,034.73 2,145.55 1,521.26 1,521.26 15.00 89.86 5,976,295.59 372,986.79 5,870.00 89.71 32.31 4,035.11 2,207.79 1,553.06 1,553.06 15.00 89.77 5,976,357.28 373,019.66 6 5,900.00 90.11 36.79 4,035.16 2,232.49 1,570.07 1.570.07 15.00 85.00 5,976,381.69 373,037.09 6,000.00 91.40 51.74 4,033.84 2,303.89 1,639.66 1,639.66 15.00 84.99 5,976,451.88 373,107.89 6,100.00 92.59 66.70 4,030.34 2,354.89 1,725.28 1,725.28 15.00 85.19 5,976,501.40 373,194.36 6,200.00 93.61 81.69 4,024.90 2,382.02 1,821.08 1,821.08 15.00 85.71 5,976,526.87 373,290.60 7 6,300.00 92.46 96.67 4,019.57 2,383.44 1,920.64 1,920.64 15.00 94.00 5,976,526.58 373,390.17 6,400.00 91.13 111.62 4,016.42 2,359.08 2,017.29 2,017.29 15.00 94.80 5,976,500.58 373,486.37 6,475.00 90.08 122.82 4,015.62 2,324.84 2,083.87 2,083.87 15.00 95.27 5,976,465.20 373,552.35 6 6,500.00 90.08 119.07 4,015.59 2,311.98 2,105.31 2,105.31 15.00 -90.00 5,976,451.98 373,573.57 6,600.00 90.08 104.07 4,015.44 2,275.33 2,198.04 2,198.04 15.00 -90.01 5,976,413.75 373,665.65 6,675.00 90.07 92.82 4,015.34 2,264.34 2,272.11 2,272.11 15.00 -90.03 5,976,401.48 373,739.51 9 6,700.00 90.07 96.57 4,015.31 2,262.29 2,297.02 2,297.02 15.00 90.00 5,976,399.01 373,764.38 6,800.00 90.07 111.57 4,015.18 2,238.05 2,393.75 2,393.75 15.00 90.00 5,976,373.12 373,860.67 6,900.00 90.06 126.57 4,015.07 2,189.61 2,480.90 2,480.90 15.00 90.02 5,976,323.19 373,946.97 10 7,000.00 90.06 111.57 4,014.96 2,141A6 2,568.06 2,568.06 15.00 -90.00 5,976,273.26 374,033.28 7,050.00 90.06 104.07 4,014.91 2,125.87 2,615.62 2,615.62 15.00 -90.02 5,976,257.16 374,080.57 11 7,100.00 89.79 96.57 4,014.98 2,116.92 2,664.78 2,664.78 15.00 -92.00 5,976,247.37 374,129.56 7,200.00 89.29 81.58 4,015.78 2,118.53 2,764.48 2,764.48 15.00 -91.99 5,976,247.27 374,229.27 12 7,300.00 89.31 96.58 4,017.01 2,120.13 2,864.17 2,864.17 15.00 90.00 5,976,247.16 374,328.97 7,375.00 89.36 107.83 4,017.89 2,104.30 2,937.35 2,937.35 15.00 89.82 5,976,230.08 374,401.86 13 7,400.00 89.36 104.08 4,018.17 2,097.43 2,961.38 2,961.38 15.00 -90.00 5,976,222.80 374,425.77 7,500.00 89.39 89.08 4,019.26 2,086.00 3,060.44 3,060.44 15.00 -89.96 5,976,209.67 374,524.60 7,600.00 89.47 74.08 4,020.26 2,100.60 3,159.07 3,159.07 15.00 -89.79 5,976,222.58 374,623.46 7,700.00 89.58 59.08 4,021.09 2,140.23 3,250.57 3,250.57 15.00 -89.64 5,976,260.63 374,715.62 Planned TD at7700.00 11/1/2017 7:36:45AM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips BATHER ConocoPhillips Planning Report UGHES a GE company Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well CD2-463 Company: ConocoPhillips(Alaska) Inc. -WNS TVD Reference: Mean Sea Level Project: Western North Slope MD Reference: CD2-463 @ 53.03usft (Doyon 19) Site: CD2 Alpine Pad North Reference: True Well: CD2-463 Survey Calculation Method: Minimum Curvature Wellbore: CD2-463L2-01 Design: CD2-463L2-01_wp02 Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +N/-S +E/-W Northing Easting Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude CD2-463L2-01_T02 0.00 0.00 4,027.00 2,373.70 1,780.93 5,976,519.24 373,250.32 70° 20' 38.950 N 151° V 43.621 W plan misses target center by 0.41 usft at 6158.93usft MD (4027.35 TVD, 2373.92 N, 1780.91 E) Point CD2-463 T5 0.00 0.00 4,022.00 2,117.39 3,228.62 5,976,238.18 374,693.29 70° 20' 36.424 N 151° V 1.329 W plan misses target center by 9.59usft at 7670.71 usft MD (4020.87 TVD, 2126.16 N, 3224.89 E) Point CD2-463 T1 0.00 0.00 4,026.00 1,843.85 1,621.96 5,975,992.24 373,082.30 70° 20' 33.739 N 151° V 48.269 W plan misses target center by 89.24usft at 5448.13usft MD (4044.41 TVD, 1805.70 N, 1543.41 E) Point CD2-463L2-01_T01 0.00 0.00 4,045.00 1,798.57 1,547.72 5.975,948.25 373,007.30 70° 20' 33.294 N 151° V 50.438 W plan misses target center by 0.64usft at 5439.80usft MD (4045.35 TVD, 1798.36 N, 1547.22 E) Point CD2-463L2-01_T03 0.00 0.00 4,016.00 2,358.73 2,017.24 5,976,500.23 373,486.32 70° 20' 38.802 N 151 ° 1' 36.717 W plan misses target center by 0.54usft at 6400.12usft MD (4016.42 TVD, 2359.04 N, 2017.40 E) Point CD2-4631_1 CTD Polygo 0.00 0.00 0.00 5,327.65 1,152.28 5,979,483.30 372,672.45 70° 21' 8.003 N 151° 2' 1.974 W plan misses target center by 5032.28usft at 6200.00usft MD (4024.90 TVD, 2382.02 N, 1821.08 E) Polygon Point 1 0.00 0.00 0.00 5,979,483.30 372,672.45 Point 2 0.00 316.77 156.59 5,979,797.31 372,834.44 Point 3 0.00 448.42 309.36 5,979,926.31 372,989.43 Point 0.00 551.80 678.67 5,980,023.33 373,360.43 Point 5 0.00 555.08 869.65 5,980,023.34 373,551.42 Point 0.00 632.27 1,286.42 5,980,093.37 373,969.42 Point 0.00 752.98 1,442.38 5,980,211.38 374,127.41 Point 0.00 814.04 1,154.27 5,980,277.36 373,840.42 Point 0.00 768.41 1,002.02 5,980,234.35 373,687.42 Point 10 0.00 767.46 597.94 5,980,240.33 373,283.42 Point 11 0.00 745.07 401.28 5,980,221.32 373,086.42 Point 12 0.00 569.89 44.21 5,980,052.30 372,726.42 Point 13 0.00 369.24 -107.37 5,979,854.29 372,571.44 Point 14 0.00 0.00 0.00 5,979,483.30 372,672.45 CD2-463 T3 0.00 0.00 4,014.00 2,017.29 2,639.21 5,976,148.20 374,102.29 70° 20' 35.442 N 151° 1' 18.549 W plan misses target center by 102.20usft at 7092.69usft MD (4014.95 TVD, 2117.83 N, 2657.52 E) Point CD2-463L2-01_T06 0.00 0.00 4,021.00 2,139.77 3,250.25 5,976,260.18 374,715.29 70° 20' 36.644 N 151° V 0.697 W plan misses target center by 0.25usft at 7699.52usft MD (4021.09 TVD, 2139.98 N, 3250.16 E) Point CD2-463L2-01 CTD Poll 0.00 0.00 0.00 1,957.04 1,455.99 5,976,108.25 372,918.31 70° 20' 34.853 N 151° 1' S3.117 W plan misses target center by 4033.61 usft at 5586.72usft MD (4033.32 TVD, 1936.12 N, 1499.93 E) Polygon Point 1 0.00 0.00 0.00 5,976,108.25 372,918.31 Point 2 0.00 332.82 -14.73 5,976,441.25 372,909.29 Point 3 0.00 482.70 150.73 5,976,588.26 373,077.28 Point 0.00 554.17 351.55 5,976,656.27 373,279.28 Point 5 0.00 538.87 566.86 5,976,637.28 373,494.28 Point 6 0.00 336.88 1,209.48 5,976,424.32 374,133.29 Point 0.00 287.15 1,633.44 5,976,367.33 374,556.30 Point 0.00 337.73 1,840.61 5,976,414.35 374,764.29 Point 9 0.00 97.21 1,929.77 5,976,172.36 374,849.31 Point 10 0.00 24.62 1,663.96 5,976,104.34 374,582.31 Point 11 0.00 49.09 993.38 5,976,140.30 373,912.30 Point 12 0.00 295.34 365.00 5,976,397.27 373,288.29 Point 13 0.00 -59.04 173.05 5,976,046.26 373,090.31 11/1/2017 T36:45AM Page 4 COMPASS 5000.14 Build 85 i ConocoPhillips ConocoPhillips Planning Report Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: Conoc oPhillips(Alaska) Inc. -WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD2 Alpine Pad North Reference: Well: CD2-463 Survey Calculation Method: Wellbore: CD2-4631-2-01 Design: CD2-463L2-01_wp02 11 BA ER BAT a GE company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Point 14 0.00 0.00 0.00 5,976,108.25 372,918.31 CD2-4631-1-01 CTD Poll 0.00 0.00 0.00 5,618.20 888.25 5,979,778.31 372,413.47 70° 21' 10.861 N 151° 2' 9.690 W plan misses target center by 5248.13usft at 6200.00usft MD (4024.90 TVD, 2382.02 N, 1821.08 E) Polygon Point 1 0.00 0.00 0.00 5,979,778.31 372,413.47 Point 0.00 196.05 -232.42 5,979,978.30 372,184.46 Point 3 0.00 282.07 -464.96 5,980,068.29 371,953.45 Point 0.00 314.89 -708.58 5,980,105.28 371,710.45 Point 0.00 223.21 -1,619.21 5,980,029.23 370,798.46 Point 0.00 -36.74 -1,554.72 5,979,768.23 370,858.48 Point? 0.00 -11.37 -1,359.12 5,979,790.24 371,054.47 Point 8 0.00 19.37 -734.50 5,979,810.27 371,679.47 Point 0.00 -58.27 -422.09 5,979,727.29 371,990.48 Point 10 0.00 -152.10 -294.45 5,979,631.29 372,116.48 Point 11 0.00 -274.48 -140.31 5,979,506.30 372,268.49 Point 12 0.00 -523.70 -34.00 5,979,255.31 372,370.50 Point13 0.00 -630.35 -12.16 5,979,148.31 372,390.51 Point 14 0.00 0.00 0.00 5,979,778.31 372.413.47 CD2-4631-2 CTD Polygo 0.00 0.00 0.00 2,050.93 1,506.39 5,976,201.25 372,970.31 70° 20' 35.776 N 151° 1' 51.644 W plan misses target center by 4034.04usft at 5673.87usft MD (4033.93 TVD, 2022.89 N, 1494.40 E) Polygon Point 1 0.00 0.00 0.00 5,976,201.25 372,970.31 Point 0.00 87.56 -375.59 5,976,295.23 372,596.31 Point 0.00 -36.90 -691.52 5,976,176.22 372,278.32 Point .0.00 -199.76 -855.76 5,976,016.21 372,111.32 Point 0.00 -330.31 -1,176.59 5,975,891.19 371,788.33 Point 0.00 -417.97 -2,086.29 5,975,819.15 370,877.33 Point 7 0.00 -796.38 -2,046.77 5,975,440.14 370,910.36 Point 0.00 -792.86 -1,667.75 5,975,437.17 371,289.35 Point 0.00 -660.20 -874.85 5,975,556.20 372,084.34 Point 10 0.00 -480.39 -539.86 5,975,730.23 372,422.34 Point 11 0.00 -322.12 -351.54 5,975,885.23 372,613.33 Point 12 0.00 -318.94 -166.55 5,975,885.24 372,798.33 Point 13 0.00 -529.21 -4.90 5,975,672.25 372,956.34 Point 14 0.00 0.00 0.00 5,976,201.25 372,970.31 CD2-463L2-01_T04 0.00 0.00 4,015.00 2,138.24 2.576.13 5,976,270.21 374,041.30 70° 20' 36.632 N 151° 1' 20.391 W plan misses target center by 0.16usft at 7008.59usft MD (4014.96 TVD, 2138.10 N, 2576.08 E) Point CD2-4631-2-01_T05 0.00 0.00 4,020.00 2,088.09 3,094.10 5,976,211.18 374,558.29 70° 20' 36.137 N 151° 1' 5.259 W plan misses target center by 0.40usft at 7533.71 usft MD (4019.61 TVD, 2088.02 N, 3094.07 E) Point CD2-463 T2 0.00 0.00 4,017.00 1,939.49 2,184.44 5,976,078.22 373,646.30 70° 20' 34.678 N 151° 1' 31.836 W plan misses target center by 332.36usft at 6635.91 usft MD (4015.39 TVD, 2268.25 N, 2233.24 E) Point CD2-463 T4 0.00 0.00 4,020.00 2,094.10 3,094.99 5,976,217.18 374,559.29 70° 20' 36.196 N 151 ° V 5.233 W plan misses target center by 5.96usft at 7535.48usft MD (4019.63 TVD, 2088.21 N, 3095.83 E) Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 7,700.00 4,021.09 2 3/8" 2.375 3.000 111112017 7:36:45AM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips Database: EDTAlaska Sandbox Company: ConocoPhillips(Alaska) Inc. -WNS Project: Western North Slope Site: CD2 Alpine Pad Well: CD2-463 Wellbore: CD2-4631-2-01 Design: CD2-463L2-01_wp02 • . ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: F UGHES a 6E company Well CD2-463 Mean Sea Level CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature Plan Annotations Measured Vertical Local Coordinates Depth Depth +NI-S +El-W (usft) (usft) (usft) (usft) Comment 5,400.00 4,047.72 1,763.55 1,566.34 TIP/KOP 5,430.00 4,046.29 1,789.77 1,551.86 Start 15 dls 5,460.00 4,042.85 1,816.25 1,538.19 3 5,490.00 4,038.60 1,843.49 1,526.39 4 5,570.00 4,033.20 1,919.73 1,503.24 5 5,870.00 4,035.11 2,207.79 1,553.06 6 6,200.00 4,024.90 2,382.02 1,821.08 7 6,475.00 4,015.62 2,324.84 2,083.87 8 6,675.00 4,015.34 2,264.34 2,272.11 9 6,900.00 4,015.07 2,189.61 2,460.90 10 7,050.00 4,014.91 2,125.87 2,615.62 11 7,200.00 4,015.78 2,118.53 2,764.48 12 7,375.00 4,017.89 2,104.30 2,937.35 13 7,700.00 4,021.09 2,140.23 3,250.57 Planned TD at 7700.00 111112017 7:36.45AM Page 6 COMPASS 5000.14 Build 85 • • Baker Hughes INTEQ Conocomillips Travelling Cylinder Report Company: ConocoPhiIli ps(Alaska) Inc. -WNS Project: Western North Slope Reference Site: CD2 Alpine Pad Site Error: 0.00 usft Reference Well: CD2-463 Well Error: 0.00 usft Reference Wellbore CD2-463L2-01 Reference Design: CD2-463L2-01_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: BA <ER F�UGHES a GE company Well CD2-463 CD2-463 @ 53.03usft (Doyon 19) CD2-463 @ 53.03usft (Doyon 19) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference CD2-463L2-01_wp02 Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 5,400.00 to 7,700.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 966.27 usft Error Surface: Pedal Curve Survey Tool Program Date 10/31/2017 From To (usft) (usft) Survey (Wellbore) Tool Name Description 81.00 447.00 CD2-463 Gyro (CD2-463) CB -GYRO -SS Camera based gyro single shot 474.54 5,118.26 CD2-463 MWD+SAG+CA+IIFR+MS (CD2 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 5,118.26 5,400.00 CD2-463L2_wp02 (CD2-463L2) MWD MWD - Standard 5,400.00 7,700.00 CD2-463L2-01_wp02 (CD2-463L2-01) MWD MWD - Standard Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (11) (' ) 2,615.50 2,376.92 10-3/4" x 13-1/2" 10-3/4 13-1/2 5,148.60 4,076.09 7-5/8" x 9-7/8" 7-5/8 9-7/8 7,700.00 4,074.12 2 3/8" 2-3/8 3 Summary Site Name Offset Well - Wellbore - Design CD2 Alpine Pad 2017 - 4 Prelim: CD2-118-A (FWK-4) - CD2-118-A 2017 - 4 Prelim: CD2-119-A (I XL) - CD2-119-A- C 2017 - 4 Prelim: CD2-120-A (301) - CD2-120-A - C 2017 - 4 Prelim: CD2-461 (302) - CD2-461 - CD2-4 2017 - 4 Prelim: CD2-461 (302) - CD2-461 PB1 v1 2017 - 4 Prelim: CD2-462 (120) - CD2-462 - CD2-4 2017 - 4 Prelim: CD2-471 (305) - CD2-471 - CD2-4 CD2-08 - CD2-08 - CD2-08 CD2-13 - CD2-13 - CD2-13 CD2-13 - CD2-13PB1 - CD2-13PB1 CD2-13 - CD2-13PB2 - CD2-13PB2 CD2-14 - CD2-14 - CD2-14 CD2-16 - CD2-16 - CD2-16 CD2-16 - CD2-16 (Sag) - CD2-16 (Sag) CD2-17 - CD2-17 - CD2-17 CD2-17 - CD2-17A - CD2-17A CD2-19 - CD2-19 - CD2-19 CD2-21 - CD2-21 - CD2-21 CD2-21 - CD2-21 PB1 - CD2-21 PB1 CD2-22 - CD2-22 - CD2-22 CD2-23 - CD2-23 - CD2-23 CD2-23 - CD2-23PB1 - CD2-23PB1 CD2-24 - CD2-24 - CD2-24 CD2-24 - CD2-24PB1 - CD2-24PB1 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) (usft) (usft) Out of range Out of range Out of range Out of range Out of range Out of range Out of range 6.725.00 4,925.00 669.70 118.56 570.72 Pass - Major Risk 6,400.00 4,875.00 652.49 95.43 561.76 Pass - Major Risk 6,400.00 4,875.00 652.49 95.50 561.70 Pass - Major Risk 6,400.00 4,875.00 652.49 95.44 561.76 Pass - Major Risk Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 1013112017 12:03:16PM Page 2 COMPASS 500a 14 Build 85 ConocoPhillips Project: Western North Slope Site: CD2 Alpine Pad Well: C D2.463 Miaa1siito rueNorthN6' a• Maanauc Fieid WELLBORE DETAILS: CD2-463L2-01 REFERENCE INFORMATION Patent WellbofB: CD2463L2 Coardinete(Nr=) Reference: Well CO2463, True North Strength: 57443.8snT Tie on MD: 5400.00 Ver9cal (TVD) Reference: Mean See Level Wellbore: CD2-463L2.01 Plan: CD2.463L2-01 w 02 CD2-463/CD2.463L2.01 P ( ) trip Angie: 80.61• Dal.:2/12018 Model' BGGM2017 Section (VS) Reference: Slot-(0.00N,0.00� Measured Depth Reference: CD2-463@53.03usft(Doyon19) Calculation Method: Minimum Curvature WELL DETAILS: CD2-463 +N/-S +E/-W Northing Easting Latitude Longitude 0.00 0.00 5974176.62 371429.10 70e 20' 15.607 N 151e 2' 35.652 W Sec MD Inc Azi TVDSS +N/-S +E/-W Dleg TFace VSect Annotation 1 5400.00 90.49 331.10 4047.72 1763.55 1566.34 0.00 0.00 1566.34 TIP/KOP 2 5430.00 94.99 331.10 4046.29 1789.77 1551.86 15.00 0.00 1551.86 Start 15 dls 3 5460.00 98.16 334.31 4042,85 1816.25 1538.19 15.00 45.00 1538.19 3 4 5490.00 98.14 338.86 4038.60 1843.49 1526.39 15.00 90.00 1526.39 4 5 5570.00 89.59 347.31 4033.20 1919.73 1503.24 15.00 135,00 1503.24 5 6 5870.00 89.71 32.31 4035.11 2207.79 1553.06 15.00 90.00 1553.06 6 7 6200.00 93.61 81.69 4024.90 2382.02 1821.08 15.00 85.00 1821.08 7 8 6475.00 90.08 122.82 4015.62 2324.84 2083.87 15.00 94.00 2083.87 8 9 6675.00 90.07 92.82 4015.34 2264.34 2272.11 15.00 -90.00 2272.11 9 10 6900.00 90.06 126.57 4015.07 2189.61 2480.90 15.00 90.00 2480.90 10 11 7050.00 90.06 104.07 4014.91 2125.87 2615.62 15.00 -90.00 2615,62 11 12 7200.00 89.29 81.58 4015.78 2118.53 2764.48 15.00 -92.00 2764.48 12 13 7375.00 89.36 107.83 4017.89 2104.30 2937.35 15.00 90.00 2937.35 13 14 7700.00 89.58 59.08 4021.09 2140.23 3250.57 15.00 -90.00 3250.57 Planned TD at 7700.00 t7- Mean E BA (ER 1-IUGHES a GE company Nis No NEI -2 g t t ,■■■■■■■01.mm-10 0 ■I'I r r,■■■■■■■■ man 0 ■I 41 �i...w t t a0lArm ��l� 0 West( -)/East(+) (250 us in) 6400 1500 1600 F+t F EI o 90 a70o a r� N � N N N 3800 N PV Q O CS N Q CD 63/C 2-46 ! i 1900 I I P anned at 00.00 CD2 3/CD ,483E -OI S art 15 tq I j CD2 63/C 2-46i 1 + 1000 poll- 1100 4' i '� i •� 246 /CD2 63L2 1 6 9 I 11 1 13 1200 1300 1400 aL O O O O O O O O O O O O O O O O O A O O O O r O, J O O O O O O De O O toN O S O O O O O O O O O O O O O O O O O O O O O O $ O O O O O O O o Vertical Section at 90.001(100 usft/in) 0 0 A A A A O O O O ConocoPhillips CD2-4E Project: Western North Slope Site: CD2 Alpine Pad Azimulhsl,True Norlh MagneticNorth:1fi.64- Magnetic Field WELLBORE DETAILS: CD2-463L1 REFERENCE INFORMATION Parent Welibore: CD2-463 Co-ordnate (N/E) Reference: Well CD2-463, True North Well: CD2-463 Wellbore: CD2.463L1 slrengln:57443.e.nT DipAngte:e0.81• Tie on MD: 8529.01 (TVD Reference: CD2-063 53.D3usft Do on 19 Vertical ) @ ( y ) Section(VS)Reference: Slot -(O.00N,O.00E) Plan:CD2.463L1 wp03(CD2-463/CD2-463L1) Dale:211r201a Measured Depth Reference: CD2-463 @ 53.03usft(Doyon19) Mosel: BGGM2017 Calculation Method: Minimum Curvature CD2-02/CD2-02 CD2-11/CD2-11 CD2.03/CD2-03Ll CD2466/CD2.466 BAF�t, I aGEcompany E 0 ConocoPhillips Alaska, Inc. Well Cunfi : HORIZONTAL -CD2463 Sehemetc-Ad. HANGER, 31 ---------7-V SURFACE, 37-2,616 SAFETY VLV. GAS LIFT, 4,500 PACKER, 4,557 NIPPLE, 4.668 Slots, 5,1655,2581 i Slots, Y 5,4145,661 Slots, 5.84%.346 Slats, 6,408.6,626 Slots, E 6,810-7.807 Slots. 8,053A,271 Slots, 8.333-8,706 Id Blots, 8,82740,594 Slots, 10,657LINER � LINER, 5,027-10,877 To. 10.887 WINS 101 C012-463 Well Attributes Max Angle & MD IT Wellbore API/UWI Field Name Well Status 501032057700 QANNIK PROD Inci(") MD (RKB) 91.82 9,772.80 Act Btm(ftKB) 10,887.0 Comment 3:07:51 PM SSSV: TRDP H2S (ppm) Date Annotation End Date KB-Grd (ft) Last W0: 44.73 R(g Release Date 7/182008 Annotation Depth Last Tag: lAnnotation Rev Reason: GLV C/O Last Mod ... Imosbor End Data 7/122010 _ Casino Strincis Casing Description CONDUCTOR String 0... 16 String ID ... 15.250 Top (RKB) 34.0 Set Depth if... 114.0 Set Depth (ND) ... 114.0 String Wt... 65.00 String... H-40 String Top Thrd WELD Casing Description SURFACE String 0... 103/4 String ID ... 9.950 Top (RKB) 36.7 Set Depth If... 2,615.5 Set Depth (ND) ... 2,376.9 String Wt... 45.50 String ... L-80 String Top Thrd BTC-M Casing Description INTERMEDIATE String 0... 75/8 String ID ... 6.875 Top (f KB) 34.4 Set Depth If- 5,148.6 Set Depth (TVD) ... 4,075.9 String Wt... 29.70 String ... L-80 String Top Thrd BTCM ' - - - - - Casing Description LINER String 0... 31/2 String ID ... 2.992 Top (ftKB) 5,026.8 Set Depth If... 10,877.1 Set Depth (ND) ... 4,088.4 String Wt... 9.30 String - L-80 String Top Thrd SLHT Liner Details Top (ttKa) Top Depth (ND) (RKB) Top Incl (") Item Description Comment Noml.. ID (in) 5.026.8 4,063.1 83.36 SLEEVE Baker "HR" Liner Setting Sleeve 6.44 OD x 5.00 ID 5.00( 5,040.7 4,064.7 83.11 NIPPLE Baker "RS" Packoff Seal Nipple 6.12 OD x 4.91 ID 4.91( 5,044.4 4,065.1 83.04 HANGER Baker 512" x 7 5/8" Flex Lock Hanger 6.59 OD x 4.901D 4.90( L 5,053.7 4,066.2 82.87 XO XO - 5 12" L-80 BTC x 412" L-80 SLHT 5.57 OD x 3.95 ID 3.95( 5,069.1 4,067.9 83.59 XO XO - 4 112" SLHT x 3 12" SLHT 2.99, Tublifin Strings Tubing Description String 0... String ID ... Top (RKB) Set Depth (f... Set Depth (ND) ... String wt... String ... String Top Thrd TUBING 31/2 2.992 31.4 5,049.4 4,065.7 9.30 L-80 EUE-M Com letion Details Top IftKB) Top Depth (ND) (RKB) Top Incl (") Item Description Comment N-L., ID (in) 31.4 31.4 -0.03HANGER FMC412"Tbghanger w/2.24'pup 4.50C 128.1 128.0 0.23 XO XO -312" EUE (P) X 412" IBTM (B) 5.21"OD x 3.00" ID 3.0N 2,690.1 2,440.6 31.94 SAFETY VLV 312" Cameo TRMAXXSE SSSV w/ 2.813" profile (TC-II B x P)ser # CXS0024 2812 4,557.4 3,920.31 59.99 PACKER Baker 3.5" x 7 518" Premier Packer 6.58" OD x 2.87" ID 2.87C -- c ems. �r=� -Up-J i/ IUUnIg VV/MUIe SDOe WL=U L4.40 L.UUZ Perforations & Slots Shot Top (ND) Btm (TVD) Dens Top (RKB) St. (RKB) (RKB) (RKB) Zone Date (sh•• Type Comment 5.1651 5,2581 4.077.31 4,13U.7 K-2 Marker, 7/182008 I 32.0 Slots I Alternating solid/slotted pipe CD2-463 Mandrel Details Top Depth Tap Port (ND) Inci OD Valve Lateh Si.e TRO Run Stn Top (ftKB) (RKB) (") Make Model (in) Sery Type Type (in) (Pat)Run Data Com... CD2-463 Proposed CTD Schematic 16" 65# H- shoe @ 11, MD 10-3/4" 45.! 80 shoe @ MD " Tubing from 5049' RKB to surface " Liner from 10877' RKB to 5027" RKB ?" EUE x 4-1/2" IBTM XO @ 128' RKB (3" ID) co TRMAXX-5E SSSV @ 2690' RKB (min ID 2.812") co KBMG GLMs @ 3404' & 4500' RKB �r Premier Packer @ 4557' RKB (2.87" ID) XN Nipple @ 4668' RKB (min ID 2.75") G @ 5025' RKB �r HR Liner Setting Sleeve @ 5027' RKB !r IRS Packoff Seal Nipple @ 5041' RKB �r Flex Lock Hanger @ 5044' RKB x 4-1/2" XO @ 5054' RKB ( 3.95" ID) !" x 3-1/2" XO @ 5069' RKB (2.992 ID) 3-1/2" Liner shoe @ 10877' MD KOP @ 5200' MD KOP @ 8625' MD -01 wp02 TD @ 770" MD CD2-463L2 wp02 RL @ 63L1-01 wp02 CD2 463L1 wp03 TOL @ 5195' MD �TD @ 7650' MD 10650' MD TD @ 10800' MD Billet at 5400' MD @ 8620' MD Billet at 8705' MD 11 TRANSMITTAL LETTER CHECKLIST WELL NAME: G 2- y 6 3 C I - a I PTD: ✓ Development _ Service _ Exploratory _ Stratigraphic Test — Non -Conventional FIELD: CsJ��r`JI� �� �/f�!' POOL: V dE. ��W_ Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER / / MULTI LATERAL The permit is for a new wellbore segment of existin well Permit No. tQ ?: API No. 50-�- `�05 - oO - O O VVV (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Compmy Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 5/2013 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, QANNIK OIL - 120180 Well Name: COLVILLE RIV QANN CD2-463L2-01 Program DEV Well bore seg ❑d PTD#:2180260 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type DEV / PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D) - - - - - - - - - - - - - NA_ - - 1 Permit fee attached------- ------------------- ---NA --------------------------- 2 Lease number appropriate- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - Yes _ _ _ _ _ _ _ ADL0380076, Surf, Top Prod & TD*,ADL0025530, Portion of Prod; ADL0380096,_Portion of well 3 Uniquewell name -and number --------------------------------__ Yes_______ CRU CD2-463L2-01_________ 4 Well located in_a_defined pool _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ - _ Yes - - COLVILLE RIVER, QANNIK OIL_- 120180,-governed_by Conaervation_Qrder No. 605_ _ 5 Well located proper distance from drilling unit _boundary - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - - - CO 695 contains no Spacing restrictions with respect to drilling unit boundaries. - - - - - - - 6 Well located proper distance from other wells- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes _ - - - - - _ CO 605 has no interwell_spacin9_restrictions-------- -------------------------------- 7 Sufficient -acreage-available in_drilling unit_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ - - - - - - - - - - - - - - _ _ _ _ _ - - - - - _ _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - _ - _ - - - - - - 8 If is is wellbore plat_included _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes ------------------------------------------------------------------- 9 Operator only affected party- - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ - - _ - - - - Yes - - - - _ - - Wellbore_will be more than 500' from external property line where ownership or landownership changes.- 10 Operator has -appropriate bond in force - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 11 Permit can be issued without conservation order --- ------------------------- Yes----------------------- ------------------------------------_-------- 12 Permit can be issued without administrativ_e_approval _ _ _ Yes PKB 3/5/2018 13 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Can permit be approved before 15-day wait- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - _ _ _ _ _ _ - - - - _ _ _ _ _ _ - - - - - - - - - - - _ - _ _ _ _ _ - - - - - - - - - _ - - - - _ _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 14 Well located within area and -strata authorizedby- Injection Order # (put 10#in_comments)(For_ NA------------------------------------------------------------------ 15 All wells-within-1/4 _mil-e area of review identified (For service well only) _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ - - - - - - - - - - 16 Pre -produced injector. duration of pre production less than 3 months_ (For service well only) _ _ NA_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 18 Conductor string- provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA - - - _ Conductor set_in CRU CD2-463 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ ----------- -- Engineering 19 Surface -casing protects all -known USDWs - _ _ _ - - - _ _ _ _ _ _ NA _ _ - Surface casing set in CRU CD2-463 - _ - _ _ - - _ - - - -------- 20 CUT_voladequate tocircuiate_onconductor&surf _csg_______________ NA___ ---- Surface casing set andfully cemented ----_--------_---_--___----_------------- 21 CMT_vol[ adequate to tie-in long string to surf csg----------------------------- NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 22 CMT_will coverall known -productive horizons_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No_ - - - - - - - Productive_ interval will be completed with uncemented slotted liner _ - - - - - - - _ _ _ _ _ _ - 23 Casing designs adequate for C,_T, B &_ permafrost- - - - - - - - - - - - - - - - - - - - - - - - - - - Yes _ _ _ _ _ _ _ - - - - - - - - - _ _ _ _ _ _ _ - - - _ _ _ _ _ - - _ - - - - - - - - - - 24 Adequate tankage_or reserve pit - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - - _ Rig has steel tanks; all waste_to approved disposal wells_ - 25 If_a_re-drill has_a 10-403 for abandonment been approved - - - - - - - - - - - - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26 Adequate wellbore separation proposed - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - _ _ _ _ _ Anti -collision analysis complete; no major risk failures - - - - - - - - - - - - - - - - - - - - - - - 27 If_diverter required, does it meet regulations_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - _ _ _ _ _ _ -------------------------------------------------- Appr Date 28 _Drilling fluid_ program schematic 8r equip -list-adequate _ _ _ - - - - Yes _ _ _ _ _ _ _ Max formation_ pressure is_2550 psig(12.2 ppy_EMW)- will drill 8.6_ppg EMW and maintain ov_erbal w/ MPD VTL 3/12/2018 29 BOPEs,-dotheymeetregulation------------------------------- - - - - -- Yes 30 BOPE_press rating appropriate; test to -(put psig in_comments)- - - - - - - - - - - - - - - - - - - - Yes _ - - - - - - MPSP is 2148 psiig, will test BQPs_to 3500_psig- - - - - _ - - - - - - - - - - - _ - - - - - - - - - - 31 Choke_manifold complies w/API_RP-53 (May $4)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ ---------------------------------------------- 32 Work will occur without operation shutdown- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - _ _ _ - - _ - - - - - - - - - - - - - - - - - - - - - - - 33 Is presence of H2S gas probable_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ _ _ _ _ _ H2S measures required_ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - _ _ _ 34 Mechanical_condition of wells within AOR verified (_For service well only_) _ _ _ _ _ _ _ _ _ _ _ _ _ NA - - _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - _ _ _ _ _ _ - - - - - - - - - _ _ _ _ _ _ - - - _ _ _ - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ - 35 Permit can be issuedwlohydrogensulfidemeasures------------------ - - - - -- No--____--H2$ measures required. -----______-___----____-_------------------- Geology 36 Data_presented on potential overpressure zones _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes - _ _ _ _ _ _ Maximum expected reservoir pressure is 12.2 ppg EMW; will be drilled using_8.6 ppg mud and MPD technique, - Appr Date 37 Seismic -analysis of shallow gas _zones _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - _ NA _ _ _ _ _ _ _ _ _ - - - _ - - - - - _ _ _ _ ---------------------------------------------------- P K B 3 / 5 / 2 018 38 Seabed _condition survey -(if off -shore) - - - - - - - - - - - - - - - - - - - - - - - - - - R ` - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 39 Contact name/phonefor weekly _pr%ressreports[exploratory only] _________________ NA_______Onshoredevelopmentspoketobedrilled._----------------------------_-__---------- Geologic Engineering Public Commissioner: Date: Commissioner: Date Co ' ner Dat