HomeMy WebLinkAbout218-005p7 -D 2l 8—D 05-
Loepp, Victoria T (DOA)
From: Hallford, Kelsey <Kelsey.Hallford@conocophillips.com>
Sent: Friday, March 23, 2018 11:11 AM
To: Loepp, Victoria T (DOA)
Cc: Bearden, 1 Daniel; Brunswick, Scott A
Subject: RE: [EXTERNAL]KRU 11-1-103 L1, L2, L3 (PTD 218-004, 005, 006) FIT Waiver
Follow Up Flag: Follow up
Flag Status: Flagged
Thank you.
Kelsey
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Friday, March 23, 2018 11:00 AM
To: Hallford, Kelsey <Kelsey.Hallford@conocophillips.com>
Cc: Bearden, J Daniel <J.Daniel. Bearden@ conocophillips.com>; Brunswick, Scott A
<Scott.A.Brunswick@conocophillips.com>
Subject: [EXTERNAL]KRU 1H-103 Ll, L2, L3 (PTD 218-004, 005, 006) FIT Waiver
Kelsey,
A waiver is granted to eliminate FIT/LOT testing on the next three laterals (218-004, 218-005, 218-006) on KRU 1H-103
L1-L3 laterals, and conduct the final planned FIT on the shallowest lateral (PTD 218-007) KRU 11-1-1031-4.
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria Loeooriilalaska aov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria Loeoo®alaska aov
From: Hallford, Kelsey <Kelsey. Hallford(cDconocoohillios com>
Sent: Friday, March 23, 2018 10:41 AM
To: Loepp, Victoria T (DOA) <victoria.loeooCa alaska eov>
Cc: Bearden, J Daniel <J.Daniel Bearden( a�conoconhilIips co m>; Brunswick, Scott A
<Scott.A.BrunswickC�conocoohillios com>
Subject: RE: [EXTERNAL]RE: PTD# 218-004, 005, 006 FIT Waiver
Good morning Victoria,
The TOC is assuming 40% washout at 3565' MD/ 2802' TVD.
The top of pool is the base of the Ugnu Sands/Top of the N sands at 5802' MD / 3562' TVD.
These are noted on the attached schematic showing as drilled formation tops, casing points, and current drilled depth.
Please let me know if there is additional information you would like to see.
Kelsey Hallford
From: Loepp, Victoria T (DOA) [mailto:victoria.loepp@alaska.gov]
Sent: Thursday, March 22, 2018 1:26 PM
To: Hallford, Kelsey <Kelsey.Hallford@conocophillips.com>
Cc: Bearden, J Daniel <J.Daniel.Bearden@conocophillips.com>
Subject: RE: [EXTERNAL]RE: PTD# 218-004, 005, 006 FIT Waiver
What is TOC assuming 30% washout?
From: Loepp, Victoria T (DOA)
Sent: Thursday, March 22, 2018 1:24 PM
To: 'Hallford, Kelsey' <Kelsev.Hallford@conocophillips.com>
Cc: Bearden, J Daniel (J. Daniel. Bearden@conocophillips.com) <J.Daniel.Bearden@conocophillips.com>
Subject: RE: [EXTERNAL]RE: PTD# 218-004, 005, 006 FIT Waiver
Please send current schematic and cement job pump chart. Also, identify TOC(md/tvd) and pool top.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. LoeooCcDalaska coy
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria Loeoo@alaskayov
From: Hallford, Kelsey <Kelsev.Hallford@conocophillips.com>
Sent: Thursday, March 22, 20181:16 PM
To: Loepp, Victoria T (DOA) <victoria.loeppCn@alaska.gov>
Cc: Bearden, J Daniel <J Daniel Bearden@conocophillips com>; Brunswick, Scott A
<Scott.A. Brunswick @conocophiIIi ps.com>
Subject: RE: [EXTERNAL]RE: PTD# 218-004, 005, 006 FIT Waiver
Sorry about that, here it is:
From: Loepp, Victoria T (DOA)[mailto:victoria.loepp@alaska.gov]
Sent: Thursday, March 22, 20181:15 PM
To: Hallford, Kelsey <Kelsey.Hallford@conocophillips.com>
Cc: Bearden, J Daniel <J.Daniel.Bearden@conocophillips.com>; Brunswick, Scott A
<Scott.A.Brunswick@conocophillips.com>
Subject: [EXTERNAL]RE: PTD# 218-004,005,006 FIT Waiver
No attachments
From: Hallford, Kelsey <Kelsey.Hallford@conocophillips.com>
Sent: Thursday, March 22, 2018 12:20 PM
To: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Cc: Bearden, J Daniel <J. Daniel. Bearden@conocophillips.com>; Brunswick, Scott A
<Scott.A.Brunswick@conocoph i l lips.com>
Subject: FW: PTD# 218-004, 005, 006 FIT Waiver
Victoria,
Approved permits to drill (218-004, 218-005, 218-006) on KRU 11-1-103 1-1-1-3 laterals require a copy of the intermediate
cement job report to be submitted for an FIT waiver consideration for the middle 3 laterals of the penta-lateral; all
within the West Sak sand. A FIT was conducted on the parent lateral (PTD 218-003) KRU 11-1-103 to the maximum
required target of 13ppg EMW. As such, we plan to eliminate FIT/LOT testing on our next three laterals, and conduct
the final planned FIT on the shallowest lateral (PTD 218-007) KRU 1H-1031-4.
Attached you will find the requested 7-5/8" intermediate cement job report on KRU well 11-1-103.
• Full returns throughout cement job
• Casing was reciprocated
• Cement plugs bumped and floats held
• Casing was pressure tested to 3500 psi
• 250 bbls of cement was pumped to cover 250' TVD above Ugnu C
Please advise,
Kelsey Hallford
Senior Drilling Engineer
ConocoPhillips, Alaska
1 H-103 — West Sak A2, A3, A4, B and D Sand Producer
A2 Lateral
Notes
MDfrVD
Geo Tops
Casing/Cement
Hole/Casing
Comments
MD'/ TVD
Size
13-1/2"
X
10-3/4" 45.5#
L80 Hydril
563
Surf. Shoe
1850/1741
1677'
1771'
Top of
Top of Cement: 3565' MDI 2802' TVD
Cement
Top of cement corresponds to:
760' TVD above West Salk Pool
345' TVD above Hydrocarbons
9 7/8"
250' TVD above Ugnu C
X
7-5/8" 29.7#
4145/3052
L80
-.....- .
Hydri1563
Ugnu C
4442/3147
.........................
Hydrocarbons
5121/3360
5405/3447
Ugnu B
.........................
Ugnu A
Top of Pool: 5802' MD / 3562' TVD
Top of Pool 15802/3562
N -
6837/3806
7215/3897
WestSak ,
7365/3934
.........................
WestSak - 8
7557/3981
WestSak - A4
7929/4070
........................
WestSak-A3.
Int. Shoe
8112 / 4087
811
40
WestSa
Currently
drilling
6-'/." Hole
@
11000'
MD
Cement
ConocoPhillips
1H-103
Intermediate Casing Cement
Cement Details
Deseription
Cementing Start Date
Cementing nd ate
WNlbore Name
Intermediate Casing Cement
&212D189945
3+21201804:9?
14-103
" GCS.. i_4JaM1fi_t; SSEi' _
Cement Stages
Stage R 1
escripaon
bjeedve
'.op DepO (flael
jiloftoc Depm ( )
Intermediate Casing
Cement Intermediate
3.585.D
8.112.:
..
._
._
Cement
casing
r beitmin
- ump ma"obR.
imp A,; (c0"
.^tp F'�a"e5"
+';5 •
z :.
_ :..
iot - Fipe RPA lrpmj
.-.. .mE
T:-
0•n: 7utDiareter lint
n*s-
Cetaent Fluids i Additives
Fluid
Fluid Description _on ,Dt
Ez'. E _ ..
.,. ..
_ .'rz -. -•Pe stip,
E. Pater I 1
a
-'p'sts 1 Ips,:
Additives
Fluid
Dinicripton
11ij
Additives
rrC .il -ar.
iaPs
Page 11
Report Printed: 3/27/2018