Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
218-087
DATA SUBMITTAL COMPLIANCE REPORT 1/18/2019 Permit to Drill 2180870 Well Name/No. KUPARUK RIV UNIT 31-OILI 17,61. Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029.21514.60-00 MD 11642 TVD 6337 Completion Date 10/14/2018 REQUIRED INFORMATION Mud Log No DATA INFORMATION List of Logs Obtained: GR/Res Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED C 29949 Digital Data ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C ED C 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data 29949 Digital Data Completion Status 1 -OIL Samples No V Current Status 1-0I1- UIC No Directional Survey Yes V/ (from Master Well Data/Logs) Log Log Run Interval OH/ Scale Media No Start Stop CH Received Comments 8366 11642 11/2/2018 Electronic Data Set, Filename: 31-01Ll GAMMA RES.Ias 11/2/2018 Electronic File: 31-OILl 21VID Final Log.cgm 11/2/2018 Electronic File: 31-01 L1 5MD Final Log.cgm 11/2/2018 Electronic File: 31-OlLl 5TVDSS Final Log.cgm 11/2/2018 Electronic File: 31-OILl 21VID Final.pdf 112/2018 Electronic File: 31-OILl 51VID Final.pdf 11/2/2018 Electronic File: 31-01 L1 5TVDSS Final.pdf 112/2018 Electronic File: 31-01 L1 EOW-NAD27.pdf 11/2/2018 Electronic File: 31-01 L1 EOW - NAD27.txt 11/2/2018 Electronic File: 31-01 L1 Final TD 11642.csv 112/2018 Electronic File: 31-01 L1 Final TD 11642.xlsx 11/2/2018 Electronic File: 31-01 L1 Survey Listing.txt 11/2/2018 Electronic File: 31-01 L1 Surveys.txt 11/2/2018 Electronic File: 31- 01 L1_25_tapescan_BHI_CTK.txt 11/2/2018 Electronic File: 31-01 L1_5_tapescan_BHI _CTK.txt 112/2018 Electronic File: 31-01 L1_output.tap 11/2/2018 Electronic File: 31-01Ll 21VID Final Log.tif 112/2018 Electronic File: 31-01 L1 5MD Final Log.tif 112/2018 Electronic File: 31-01 L1 5TVDSS Final Log.tif AOGCC Page 1 oft Friday, January 18, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/18/2019 Permitto Drill 2180870 Well Name/No. KUPARUK RIV UNIT 31-0l L1 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-21514-60-00 MD 11642 TVD 6337 Completion Date 10/14/2018 Completion Status 1 -OIL Current Status 1 -OIL UIC No Log C 29949 Log Header Scans 0 0 2180870 KUPARUK RIV UNIT 31-OlL1 LOG HEADERS Log C 29950 Log Header Scans 0 0 2180870 KUPARUK RIV UNIT 31-OlL1 PB1 LOG HEADERS ED C 29950 Digital Data 8366 10022 11/2/2018 Electronic Data Set, Filename: 31-011-1PB1 GAMMA RES.Ias ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 PB1 21VID Final.cgm ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 PB1 5MD Final.cgm ED C 29950 Digital Data 11/2/2018 Electronic File: 31-OlLlP61 5TVDSS Final.cgm . ED C 29950 Digital Data 11/2/2018 Electronic File: 31-0l L1 PBI 21VID Final.pdf ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 P61 51VID Final.pdf ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 PB1 5TVDSS Final.pdf ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 PB1 EOW - NAD27.pdf j ED C 29950 Digital Data 112/2018 Electronic File: 31-01 L1 PB1 EOW-NAD27.txt ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 PB1 Final TO 10022.csv ED C 29950 Digital Data 11/2/2018 Electronic File: 31-011-1PB1 Final TO 10022.xlsx ED C 29950 Digital Data 112/2018 Electronic File: 31-01 L1 P131 Survey Listing.txt ED C 29950 Digital Data 11/2/2018 Electronic File: 31-011-1PB1 Surveys.txt ED C 29950 Digital Data 11/2/2018 Electronic File: 31- 01 L1 P81_25_tapescan_BHI_CTK.txt ED C 29950 Digital Data 11/2/2018 Electronic File: 31- 01 L1 PB1_5_tapescan_BHI_CTK.txt ED C 29950 Digital Data 11/2/2018 Electronic File: 31-OlLlPBI_output.tap ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 PB1 21VID Final.tif ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01L1P131 51VID Final.tif ED C 29950 Digital Data 11/2/2018 Electronic File: 31-01 L1 P131 5TVDSS Final.tif ED C 29973 Digital Data 11/7/2018 Electronic File: 31-0l L1 EOW-NAD27.pdf ED C 29973 Digital Data 11/7/2018 Electronic File: 31-01 LI EOW-NAD27.txt ED C 29973 Digital Data 11/7/2018 Electronic File: 31-011.1 EOW - NAD83.pdf ED C 29973 Digital Data 11/7/2018 Electronic File: 31-01 L1 EOW-NAD83.txt AOGCC Page 2 of Friday, January 18, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/18/2019 Permit to Drill 2180870 Well Name/No. KUPARUK RIV UNIT 31-01Ll Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-21514-60-00 MD 11642 TVD 6337 Completion Date 10/14/2018 Completion Status 1 -OIL Log C 29973 Log Header Scans 0 0 Log C 29974 Log Header Scans ED C 29974 Digital Data ED C 29974 Digital Data ED C 29974 Digital Data ED C 29974 Digital Data Well Cores/Samples Information Name INFORMATION RECEIVED© Completion Report yy�� Production Test Information1@1 NA Geologic Markers/Tops OY COMPLIANCE HISTORY Completion Date: 10/14/2018 Release Date: 8/30/2018 Description Comments: Interval Start Stop Directional / Inclination Data D Mechanical Integrity Test Information Y / NA Daily Operations Summary0 Date Comments 0 0 Sent Received Current Status 1-0I1- UIC No Sample Set Number Comments Mud Logs, Image Files, Digital Data Y /(9 Composite Logs, Image, Data Filess Cuttings Samples Y /R Core Chips Y Core Photographs Y / Laboratory Analyses Y /T) Compliance Reviewed By: Date: AOGCC Page 3 of R Friday, January 18, 2019 2180870 KUPARUK RIV UNIT 31-OlLl LOG HEADERS 2180870 KUPARUK RIV UNIT 31-0lLl PB1 LOG HEADERS 11/7/2018 Electronic File: 31-01 L1 PB1 EOW - NAD27.pdf 11/7/2018 Electronic File: 31-01L1 PB1 EOW-NAD27.txt 11/7/2018 Electronic File:31-01L1PB1 EOW-NAD83.pdf 11/7/2018 Electronic File: 31-01L1 PB1 EOW-NAD83.txt Sample Set Number Comments Mud Logs, Image Files, Digital Data Y /(9 Composite Logs, Image, Data Filess Cuttings Samples Y /R Core Chips Y Core Photographs Y / Laboratory Analyses Y /T) Compliance Reviewed By: Date: AOGCC Page 3 of R Friday, January 18, 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 10V 13 2018 WELL COMPLETION OR RECOMPLETION REPORT 1a. Well Status: Oil 11 • Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ❑ WIND❑ WAGE] WDSPL❑ No. of Completions: AN 1b. Well Class: Development 0 ' Exploratory ❑ Service Stratigraphic Test El 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 10/14/2018 14. Permit to Drill Number / Sundry: 218.087 • 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 1018/2018 15. API Number: 50-029-21514-00-00 4a. Location of Well (Governmental Section): Surface: 344' FSL, 179' FWL, Sec 31, T13N, R9E, UM Top of Productive Interval: 1257' FNL, 360' FEL, Sec 31, T13N, R9E, UM Total Depth: 1317' FNL, 2657' FWL, Sec 31, T13N, R9E, UM 8. Date TO Reached: 10/10/2018 16. Well Name and Number: KRU 31-011-1/31-011-112131 9. Ref Elevations: KB:71 GL: 40 . BF: 17. Field / Pool(s): Kuparuk River Field/Kuparuk River Oil Pool ' 10. Plug Back Depth MDITVD: � 11404/6342 ' 18. Property Designation: ADL 25521 • 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 508056' y- 6007286 - Zone- 4 TPI: x- 512776 y- 6010970 Zone- 4 Total Depth: x- 510530 y- 6010907 Zone- 4 11. Total Depth MD1TVD: . 11642/6337 - 19. DNR Approval Number: LOINS 83-130 12. SSSV Depth MDlf VD: N/A 20. Thickness of Permafrost MD/TVD: 1300/1256 5. Directional or Inclination Survey: Yes ❑� (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: • 9170/6339 • 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16 62.5 H40 31 104 31 104 24 274 sx CS II 9518 36 J-55 31 4346 31 3305 12 114 1650 sx AS III, 320 sx Class G 7 26 J-55 24 9010 24 6528 81/2 300 sx Class G and 175 sx ASI 23/8 4.6 L-80 9126 11404 6345 6342 3 Slotted Liner 24. Open to production or injection? Yes ❑� No ❑ If Yes, list each interval open (MDrr VD of Top and Bottom; Perforation Size and Number; Date Perfd): SLOTTED LINER @: COMPLETION DATE 9134- 11404 MD and 6345 - 6342 TVD... 10/11/2018 _ /o/ly I,n VERIFIED 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3112 8747 853516179 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑� Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 10/20/2018 Method of Operation (Flowing, gas lift, etc.): FLOWING Date of Test: 10/26/2018 Hours Tested: 18.8 Production for Test Period Oil -Bbl: 565.6 Gas -MCF: 441 Water -Bbl: 2178 Choke Size: 104 Gas -Oil Ratio: 1780 Flow Tubing Press. 179 Casino Press: 1272 lCalculated 24 -Hour Rate Oil -Bbl: 722 Gas -MCF: 563 Water -Bbl: 27 Oil Gravitv - API (corr): 1 1 Form 10-407 Revised 5/2017 �L ({��r/� COWN/�Z E2 RBDMS�Ct N,i� 1018Submit ORIGINIAL only 28. CORE DATA Conventional Corals): Yes ❑ No Q Sidewall Cores: Yes ❑ No Q If Yes, list formations and intervals cored (MDlfVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1300 1256 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 9170 6339 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kuparuk A2 31-01 L1 P61 10022 6348 TD 11642 6338 Formation at total depth: I Kuparuk Al 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, oaleontolooiral report, production r well test re ults, per 20 AAC 25,070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: Keith Herrin Authorized Title: StO CTD Engineer Contact Email: Keith.E.Herrin a co .com AuthorizedContact Phone: 263-4321 Signature: Date:/ INST CTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3l -D1 Proposed CTD Schematic 18" 82M H4 sh ®104'MD 85/8' 388 J55 shoe � 4346 MO BHAfM SWdrMVlkdeM ... <ad RrM 8]31'-8]6tl M0 B]IQ-B7W AM-8]BC MD T 260Jd5 shoe 0 and MD 3-112" Como, MMG gas lie mandrels @ 3129' RM Bahr Drift, Valva @ 3596' MD YIQ-9.3R L50 EUE and Turing to surface 3VT Camco MMG gas lift mandrels Qg 4929', ant, ]2]1', 5002', & 8469' Baker Lacator ® 851T RKB Baker PBR 8040 ® 8522' MD (3" ID) Baker FHL PBekerQ 8535' MD (4" ID) 3-W X larding nipple at 8588' MD (2.813" min ID) Top of Wedge Assembly @ 8598' RKB 3 W X landing nipple at 871T MD (2.813' min ID) Top of Wedge Assembly ® BT28' RKB 3-k" X landing nipple M 8]42' MD (2.813" min ID) Baker WLEG @ 814T MD ' L3/9'SbNtl Mw w/tlaplg • __-_-____ � _._______� rel • xla6'm[Mikeva il%-ei9'Mn, MO - wro•uwa•Mo :: - ban arunmurnaw 'I.••.'• " _ __ _ ---___ rIXsxxc ma mi v�w'rnoa Ida MO S.i/9'ISImM Mner r/g1a�MwepaWm — T -To.] cr-ti i,-93xY MO^BIX'0133'Mea�lM ooh, x.9/r:wm ma.]awaam end •HYMY, 90L•]xPA'MO *aoaMs•ewx•Mo Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time End Time Dur (hr) Phase Op Cade Acdlviry Code Time P -T -X Operation dIKS) End Depth (hKB) 9/14/2018 9/14/2018 5.50 MIRU MOVE MOB P Pull off well, install jeeps, modules 0.0 0.0 12:00 17:30 lined up to head out. 9/14/2018 9/14/2018 0.50 MIRU MOVE MOB P Made call to securtiy to start move, 0.0 0.0 17:30 18:00 informed that we won't start until last bus @ 18:30, stand by 9/14/2018 9/14/2018 0.50 MIRU MOVE MOB T Stand by for busses 0.0 0.0 18:00 18:30 9/14/2018 9/14/2018 1.50 MIRU MOVE MOB T Made call to start moving dg, informed 0.0 0.0 18:30 20:00 that it was fire training on sweat pad (i C -access road), continue standing by 9/14/2018 9/15/2018 4.00 MIRU MOVE MOB P Mobilize dg towards 31 -pad 0.0 0.0 20:00 00:00 9/15/2018 9/15/2018 2.00 MIRU MOVE MOB P Continue moving dg towards 31 -pad 0.0 0.0 00:00 02:00 9/15/2018 9/15/2018 1.00 MIRU MOVE MOB P On 31 pad, Remove jeeps. Prep cellar 0.0 0.0 02:00 03:00 for spotting dg. 9/15/2018 9/15/2018 6.00 MIRU MOVE MOB P Spot dg. Work rig up check list 0.0 0.0 03:00 09:00 9/15/2018 9/15/2018 4.50 MIRU WHDBOP NUND P RIG ACCEPT 09:00. Nipple up BOPE, 0.0 0.0 09:00 13:30 Service rig, Prep for BOPE test, trouble shoot swab two 9/15/2018 9/15/2018 6.50 MIRU WHDBOP BOPE P Start full BOPE test, Test witnesed by 0.0 0.0 13:30 20:00 Brian Bixby AOGCC, Fail / Pass on Swab 2, R-2 and B-7 9/15/2018 9/15/2018 2.40 MIRU WHDBOP PRTS P Pressure test PDL's & TT line to 2000 0.0 0.0 20:00 22:24 PSI, Line up to fill CT 9/15/2018 9/16/2018 1.60 SLOT WELLPR CTOP P Start filling CT, Boot wire Perform 0.0 0.0 22:24 00:00 slack Mgmt. Surge CT 3 times to 3.5 BPM. Unstab and see wire 4 feet up CT Slab back on and repeat. 9116/2018 9/16/2018 0.70 SLOT WELLPR CTOP P Surge coil 3 more times to 3.8 BPM. 0.0 0.0 00:00 00:42 did not hear wire move. Unstab. ut 5' CT have wire. Test E -line 131 Chimes >2000Mohmes 9/16/2018 9/16/2018 0.90 SLOT WELLPR CTOP P Prep coil. Install CTC, Pull test to 35K 0.0 0.0 00:42 01:36 9/16/2018 9/16/2018 0.60 SLOT WELLPR CTOP P Head up UQC, PT CTC and UQC to 0.0 0.0 01:36 02:12 4K 9/16/2018 9/16/2018 1.70 SLOT WELLPR PRTS P PT and chart inner reel valve / Iron. 0.0 0.0 02:12 03:54 R5 R6 and SR1 needed to be serviced 9/16/2018 9/16/2018 0.50 SLOT WELLPR CIRC P Circ freshwater out of coil, Open SSV, 0.0 0.0 03:54 04:24 Open tangos. WHP=1240 PSI 9/16/2018 9/16/2018 1.00 PROD1 WHPST PULD P PJSM, PD BHA#1 window milling 0.0 74.3 04:24 05:24 BHA with 2.80 window mill, string reamer, .6° AKO motor 9/16/2018 9/16/2018 1.10 PROD1 WHPST PULD P Skid injector, change out packofis, 74.3 74.3 05:24 06:30 install checks, test MWD, tag up and set depth 9/16/2018 9/16/2018 1.90 PROD1 WHPST TRIP P RIH with window milling BHA#1 74.3 8,120.0 06:30 08:24 9/16/2018 9/16/2018 2.05 PROD1 WHPST DLOG P Strip log HRZ and 1<1 (+6.5' 8,120.0 8,730.3 08:24 10:27 correction) down to top of whipstock @5 ft/min, swap hole over to 8.7ppg Power -Pro solids free drilling mud 9/16/2018 9/16/2018 0.05 PROD1 WHPST TRIP P Dry tag TOW @ 8730.3', wt check 8,730.3 8,730.3 10:27 10:30 38K, come online with pumps at 2 BPM, 9/16/2018 9/16/2018 0.50 PROD1 WHPST DISP P Finish displacing well to 8.7 pps power 8,730.3 8,703.0 10:30 11:00 -pro SF drilling mud 9/16/2018 9/16/2018 0.30 PROD1 WHPST TRIP P RBIH. and re -tag TOW at 8729.43' 8,703.0 8,729.4 11:00 11:18 Page 1137 Report Printed: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Tens End Time Dur hr ( ) Phase Op Cotle Activtry CoOe lune P -T -X Operetion (rt KB) Eno Dept (flKB) 9/16/2018 9/16/2018 8.70 PROD1 WHPST WPST P OBM, 1.8 bpm, freespin = 4240 psi, 8,729.4 8,733.8 11:18 20:00 diff --440 psi, BHP=4124 psi, IA=119 psi bled to 630 psi, OA=164 psi, function test auto choke system at 12:15, 9/16/2018 9/17/2018 4.00 PROD1 WHPST WPST P 8733.75, 1.79 BPM @ 4240 PSI FS, 8,733.8 8,735.2 20:00 00:00 BHP=4095 9/17/2018 9/17/2018 2.50 PRODi WHPST WPST P Continue milling window off NS 8,735.2 8,736.0 00:00 02:30 1 1 Whipstock 9/17/2018 9/17/2018 1.30 PROD1 WHPST WPST P Continue milling, 1.8 BPM @ 4240 8,736.0 8,736.7 02:30 03:48 PSI FS, BHP=4080 9/17/2018 9/17/2018 3.00 PROD1 WHPST WPST P Call 7" exit. 1.8 BPM @ 4240 PSI FS, 8,736.7 8,754.4 03:48 06:48 BHP=4090 9/17/2018 9/17/2018 0.15 PRODt WHPST WPST P TD rathole, PUW 36 k 8,754.4 8,754.4 06:48 06:57 9/17/2018 9/17/2018 1.40 PROD1 WHPST REAM P Ream widow area as drilled TF, 300° 8,754.4 8,720.0 06:57 08:21 LOHS, 150° ROHS, and 180° of HS, dry dirft clean 9/17/2018 9/17/2018 0.45 PROD1 WHPST SIPB P PUH, obtain static pressure survey 8,720.0 8,632.0 08:21 08:48 above window, 12.0 ppg 9/17/2018 9/17/2018 1.50 PROD1 WHPST TRIP P POOH, following MP 8,632.0 74.2 08:48 10:18 9/17/2018 9/17/2018 1.00 PROD1 WHPST PULD P Al surface, tag up, space out, PUD 74.2 0.0 10:18 11:18 milling BHA 9/17/2018 9/17/2018 0.25 PROD! WHPST PULD P LD tools 0.0 0.0 11:18 11:33 Note: Mills Gauged DSM - 2.79" nogo, String Reamer - 2.80" nogo 9/172018 9/17/2018 0.35 PROD? WHPST CIRC P Flush surface lines and BOP stack 0.0 0.0 11:33 11:54 9/17/2018 9/17/2018 0.25 PROD? DRILL PULD P PU/MU build section BHA 0.0 0.0 11:54 12:09 9/17/2018 9/17/2018 0.75 PRODt DRILL PULD P PD build section BHA #2 0.0 72.2 12:09 12:54 9/17/2018 9/172018 0.25 PROW DRILL PULD P MU UOC, surface test Coilrak tools 72.2 72.2 12:54 13:09 (good -test) 9/17/2018 9/17/2018 0.25 PRODt DRILL PULD P Stab INJH, check pac-offs, tag up, 72.2 72.2 13:09 13:24 reset depth counters 9/17/2018 9/17/2018 1.40 PROD1 DRILL TRIP P RIH 72.2 8,395.0 13:24 14:48 9/17/2018 9/17/2018 0.20 PROD1 DRILL DLOG P Log the K1 marker correction of minus 8,395.0 8,419.0 14:48 15:00 19.5' 9/17/2018 9/17/2018 0.20 PROD1 DRILL TRIP P Continue IH 8,419.0 8,754.4 15:00 15:12 9/17/2018 9/17/2018 1.10 PROD1 DRILL DRLG P OBD, 175 bpm at 4,095 psi, Diff --640 8,754.4 8,845.3 15:12 16:18 psi, WHP=256, BHP=4,000, IA=626, OA= 164 9/172018 9/17/2018 0.20 PROD1 DRILL TRIP T Unable to achieve build rate, PUH, 8,845.3 8,701.0 16:18 16:30 PUW 35 K, AVG DLS=34° vs plan 45° 9/17/2018 9/17/2018 1.00 PROD1 DRILL TRIP T Open EDC, continue POOH 8,701.0 3,623.6 16:30 17:30 9/17/2018 9/172018 0.75 PRODi DRILL TRIP T Function closed Orbit valve, check 3,623.6 3,623.6 17:30 18:15 well for flow (no -flow) Crew change 9/17/2018 9/172018 0.75 PROD1 DRILL TRIP T Continue POOH 3,623.6 72.2 18:15 19:00 9/17/2018 9/17/2018 0.25 PRODt DRILL PULD T Tag up, check welll for flow 72.2 72.2 19:00 19:15 9/17/2018 9/17/2o18 0.60 PROD1 DRILL PULD T Unstab INJH, swap out motor, inspect 72.2 0.0 19:15 19:51 j bit., Bit out 1-1 with chipped tooth on reamer Page 2137 Report Printed: 110M5201A Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time our (hr) Phase Op Code Achy ty Code Time P -T -X Operabon (MB) End Depth (W) 9/17/2018 9/17/2018 0.50 PROD1 DRILL PULD T PUIMU Build BHA#2 0.0 72.2 19:51 20:21 9/17/2018 9/17/2018 0.25 PROM DRILL PULD T Stab INJH, MU UO, surface test 72.2 72.2 20:21 20:36 Coiltrak tools (good -test) 9/17/2018 9/17/2018 0.50 PROD1 DRILL TRIP T RIH, fallowing MP Schedule 72.2 3,500.0 20:36 21:06 9/17/2018 9/17/2018 0.25 PROD1 DRILL TRIP T Function opened Orbit valve 3,500.0 3,500.0 21:06 21:21 9/1712018 9/17/2018 1.20 PROD1 DRILL TRIP T Continue IH 3,500.0 8,395.0 21:21 22:33 9/17/2018 9/17/2018 0.20 PROD1 DRILL DLOG T Log the K1, minus 21.5' correction 8,395.0 8,423.0 22:33 22:45 9/17/2018 9/17/2018 0.20 PROM DRILL TRIP T Contiinue IH 8,423.0 8,749.0 22:45 22:57 9/17/2018 9117/2018 0.20 PROD1 DRILL DLOG T Log the RA marker 8,733' 8,749.0 8,755.0 22:57 23:09 9/1712018 9/17/2018 0.20 PROM DRILL TRIP T Continue IH 8,755.0 8,845.0 23:09 23:21 9/17/2018 9/18/2018 0.65 PROD1 DRILL DRLG P OBD, 1.6 bppm at 3,724 psi, diff --3478 8,845.0 8,894.0 23:21 00:00 psi, WHP=292, BHP=4,066, IA=611, OA=159 9/18/2018 9/18/2018 2.80 PROD1 DRILL DRLG P OBD, 1.6 bppm at 3,724 psi, diff=3478 8,894.0 9,170.0 00:00 02:48 psi, WHP=292, BHP=4,066, IA=611, OA=159 9/18/2018 9/18/2018 2.40 PROD1 DRILL TRIP P 9170', Call end of build, Pump 5 X 5 9,170.0 67.0 02:48 05:12 Sweeps, Avg DLS= 46.06° 9/18/2018 9/18/2018 0.40 PROD1 DRILL PULD P At surface, Lay down BHA#3 67.0 0.0 05:12 05:36 9/18/2018 9/18/2018 0.90 PROD1 DRILL PULD P M/U BHA #4, L1 lateral drilling BHA 0.0 78.2 05:36 06:30 with .5° AKO motor, New HYC At bicenter with 11 MM ciders, and agitator, M/U to coil and surface lest. Equalize orbit valve and open 9/18/2018 9/18/2018 1.60 PROD1 DRILL TRIP P RIH, EDC closed, Shallow test agitator 78.2 8,400.0 06:30 08:06 @ 500'. Start new mud down CT @ 3500' 9/18/2018 9/18/2018 0.20 PROM DRILL DLOG P Log K1 for -21.5, PUW=39K 8,400.0 8,445.0 08:06 08:18 9/18/2018 9/18/2018 0.30 PROD1 DRILL TRIP P Continue in hole 8,445.0 9,157.0 08:18 08:36 9/18/2018 9/18/2018 0.30 PROM DRILL DRLG P 9157, Tag up 13' high. Pull off bottom. 9,157.0 8,750.0 08:36 08:54 PUH to log RA 9/18/2018 9/18/2018 0.10 PROD1 DRILL DLOG P 8750 Log RA marker for -1" 8,750.0 8,769.0 08:54 09:00 9/18/2018 9/18/2018 0.10 PROD1 DRILL TRIP P RBIH, tag up 2 9169' 8,769.0 9,169.0 09:00 09:06 9/18/2018 9/18/2018 2.80 PROD1 DRILL DRLG P 9169' Drill, 1.81 BPM @ 4527 PSI FS, 9,169.0 9,470.0 09:06 11:54 BHP=5783, New mud at bit 9/18/2018 9/18/2018 0.10 FROM DRILL WPRT P BHA wiper to get off tool stops, 9,470.0 9,470.0 11:54 12:00 PUW=39K 9/18/2018 9/18/2018 0.90 PROD? DRILL DRLG P 9470', Drill, 1.8 BPM @ 4790 PSI FS, 9,470.0 9,570.0 12:00 12:54 BHP=3984 9/18/2018 9118/2018 0.80 PROD1 DRILL WPRT P Wiper to 8800', PUW=39K, Frac sand 9,570.0 9,570.0 12:54 13:42 coming back in cuttings, Clean trip up and down 9/18/2018 9/18/2018 3.60 PROM DRILL DRLG P 95701, drill, 1.8 BPM @4790 PSI FS, 9,570.0 9,970.0 1342 1718 BHP=4023, RIW=14.3K 9/18/2018 9/18/2018 0.40 PROD1 DRILL WPRT P Wiper up -hole, PUW=41K 9,970.0 8,800.0 17:18 17:42 Page 3/37 ReportPrinted: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depm Sten Time End Time our inn Phase Op Code Ac" Code Time P -T -X Opembon (ftKB) End Depm rMS) 9/18/2018 9/18/2018 1.20 PROD1 DRILL WPRT P Wiper in-hole, losing CWT, PU, reduce 8,800.0 9,970.0 17:42 18:54 rate & speed, get to bottom, continue to have significant frac sand over shakers 9/18/2018 9/18/2018 0.80 PROD? DRILL DRLG P Drill, CWT= OK, WOB = 1.4K, BHP = 9,970.0 10,022.0 18:54 19:42 4088 psi, WHP = 175 psi, pump 5x5 sweeps 9/18/2018 9/18/2018 0.40 PROD1 DRILL WPRT P Pull early wiper to clean up hole, PUW 10,022.0 8,683.0 19:42 20:06 = 41 K, continued significant frac sand overshaker 9/18/2018 9/18/2018 0.70 PROD1 DRILL WPRT P Wiper in-hole, log RA for+2.5' 8,683.0 9,250.0 20:06 20:48 corretion, stacking weight at -9250', PUH, dragging weight (-42K CWT & - 2K negative WOB) 9/18/2018 9/18/2018 2.00 PROM DRILL CIRC P Pump 5x5 sweeps, decision made to 9,250.0 8,880.0 20:48 22:48 continue slowly uphole cleaning up above BHA, pump numerous additional sweeps, 7 bottoms up & continue to have significant frac sand in samples (not cleaning up) 9/18/2018 9/18/2018 0.90 PROM DRILL CIRC P Pull into cased hole, circulate bottoms 8,880.0 7,600.0 22:48 23:42 up, jog up to 7600', jog produced increased amount of cuttiing/frac sand overshaker 9/18/2018 9/19/2018 0.30 PROD1 DRILL CIRC P RBIH to 8600', begin another jog up to 7,600.0 8,600.0 23:42 00:00 7600' 9/19/2018 9/19/2018 0.80 PROD1 DRILL CIRC P Continue jog to 7600', density out up 8,600.0 8,600.0 00:00 00:48 to 9.06 ppg, RBIH to 8600, repeat, continued large quantities of frac sand over shaker (near 100% frac sand w/reduction in cuttings) 9/19/2018 9/19/2018 0.70 PROM DRILL CIRC P Pump sweeps & jog again to 7600', 8,600.0 8,600.0 00:48 01:30 minimal cuttings/frac sand over shakers 9/19/2018 9/19/2018 1.00 PROM DRILL WPRT P Attempt to RBIH to drill, log RA for+2' 8,600.0 8,732.0 01:30 02:30 correction, stack weight at 9210', continue stacking weight through 9240', PUH, dragging heavy 50K CWT & -7K WOB, packing off, significant motor work, get to 8777', -7K WOB, RBIH, stack 8K WOB at 8784', pull to 60K through window, can orient, pumps down coming through window, unable to move pipe 9/19/2016 9/19/2018 1.70 PROM DRILL CIRC T Confer w/town, await instructions on 8,732.0 8,732.0 02:30 04:12 bringing up pump, can orient, bring rate to .25 bpm, have returns, attempt to pull up, pull to -7K WOB 9/19/2018 9/19/2018 1.80 PROD1 DRILL CIRC T Continue to circulate at .25 bpm 8,732.0 8,732.0 04:12 06:00 attempting to work pipe up and down intermittently, then allow additional circulation time, no success, confer w/ town, bring rate up to .5 bpm, 1 for 1 returns, unable to break free 9/19/2018 9/19/2018 2.70 PROD1 DRILL CIRC T Crew chane, Bring pump rate up to 8,732.0 8,732.0 06:00 08:42 1.54 BPM. Unable to orient at this rate. Dig pressure @ 1700 PSI if not stalled at near stall. Circulating 1 to 1. Work pipe up to 52K = -15K DHWOB. Down to -1 OK DHWOB. No movement. Pump two sects of 5 X 5 sweeps to clear up hole. Page 4/37 Report Printed: 10115120181 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X operation (fiK6) End Depth (ftKB) 9/19/2018 9/19/2018 0.70 PRODII DRILL CIRC T Line up to pump down backside, .2 8,732.0 8,732.0 08:42 09:24 BPM @ 1750 PSI WHIP. Unable to pump rate down backside. Line back up to coil. Working choke and pump got free going down 911912018 9/1912018 0.50 PROD1 DRILL WPRT T RIH Pumping 1.25 BPM. Start sweeps 8,732.0 8,770.0 09:24 09:54 down CT. Packing off, stuck @ 8770. Work pipe pull free. 55K 9/19/2018 9119/2018 0.50 PRODt DRILL CIRC T Pulling uphole, sweeps coming out. 8,770.0 8,731.0 09:54 10:24 Take a couple of runs at window at different orientations. Hanging up unable to come up through window able to run back in hole. Become stuck in window. Work pipe up and down. Increase WHP. Pop free woking down. Pull up through window 9/19/2018 9/19/2018 0.30 PRODt DRILL WPRT P Pull uphole 8,731.0 8,390.0 1024 1042 9/19/2018 9/19/2018 0.20 PROD1 DRILL DLOG P Log K1 for+3' corection 8,390.0 8,422.0 10:42 10:54 9/19/2018 9/19/2018 0.70 PROD1 DRILL TRIP P RBIH to clean up seconday wedge 8,422.0 8,715.0 10:54 11:36 setting area, Recip area, pump sweeps 9/19/2018 9/19/2018 1.80 PROD1 DRILL TRIP P POOH, EDC closed 8,715.0 64.8 11:36 1324 9/19/2018 9/19/2018 1.30 PROD1 DRILL PULD P At surace, Tag up and space out. 64.8 0.0 13:24 1442 PJSM PUD BHA#4. BHA out with no scrape marks on string. Motor has 1 fill port missing. Bit out with 2 chipped teeth on reamer 9/19/2018 9/19/2018 3.60 PROD1 DRILL SLKL T R/U slick line / PDS caliper to 0.0 0.0 14:42 18:18 diagnose window problems, PT to 1800 psi 9/19/2018 9/1912018 2.70 PROD1 DRILL SLKL T RIH with caliper on slick -line, log 8760' 0.0 0.0 18:18 21:00 to 8400', POOH 9119/2018 9/19/2018 1.00 PROD1 DRILL SLKL T Break off lubricator, RD caliper, PDS 0.0 0.0 21:00 22:00 rep performed intial data evaluation, insufficient data, did not fully exit window 9/19/2018 9/20/2018 2.00 PRODt DRILL SLKL T RU caliper to repeat run, RIH F-8790% 0.0 8,790.0 22:00 00:00 1 1 1 await am timer, log 8785' to 8400' 9/20/2018 9/20/2018 PRODII 00:00 00:00 9/20/2018 9/20/2018 1.20 PROD? DRILL SLKL T Await caliper timer, complete caliper 8,790.0 0.0 00:00 01:12 run, POOH, tag up 9/2012018 9/20/2018 0.30 PRODt DRILL SLKL T PJSM, pop ofi lubricator, RD caliper, 0.0 0.0 01:12 01:30 stab lubricator back on 9/20/2018 9/2012018 2.70 PROD1 DRILL SLKL T Await caliper data processing (rush 0.0 0.0 01:30 04:12 job requested) 0.6° AKO motor ready, X -Lock located & ready for delivery, NS Wedge ready for delivery, PDL pre -loaded 9/20/2018 9/20/2018 1.30 PROD1 DRILL SLKL T Recieve & evaluate caliper data, await 0.0 0.0 04:12 05:30 plan forward 9/20/2018 9/20/2018 0.70 PROD1 DRILL SLKL T Plan forward to run crayola mill in 0.0 0.0 05:30 06:12 window, rig down slick line 9/20/2018 9/20/2018 1.50 PRODII DRILL PULD T PJSM, PD pre loaded BHA#5 with 0.0 62.8 06:12 07:42 2.79 Crayola mill, .6" AKO motor. Make up injecor andsurfaoe test 9/20/2018 9/20/2018 1.50 PROD1 DRILL TRIP T Trip in hole BHA#5, EDC open 62.8 8,400.0 07:42 09:12 Page 5/37 ReportPrinted: 1011512018 - Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stmt Time End Time our (hr) Phaee Op Code AcNity Code Time P -T -X Operation rtKS) End Deph(ftKB) 9/20/2018 9/20/2018 0.20 PROD1 DRILL DLOG T Log K1 for -18' correction, PUW=34K, 8,400.0 8,428.0 09:12 0924 Close EDC 9/20/2018 9/20/2018 0.20 PROD1 DRILL TRIP T Continue in well 8,428.0 8,715.0 09:24 0936 9/20/2018 9/20/2018 4.00 PROD1 DRILL MILL T 8715, Pumps on 1.8 BPM @ 3890 PSI 8,715.0 8,740.0 09:36 13:36 FS, BHP=3867, Stall at 8734, Pick up and restart. Mill down to 8740. Perform passes @ 30L, 30R, 180R. Dry drift window - looks good. pump sweeps. No material on shaker 9/20/2018 9/20/2018 1.80 PROD1 DRILL TRIP T 8740, Trip out of hole 8.740.0 47.9 13:36 15:24 9/20/2018 9120/2018 0.90 PROD1 DRILL PULD T At surace, lag up and space out. 47.9 0.0 15:24 16:18 PJSM, PUD BHA#5. Mill out @ 2.79 NoGo 9/20/2018 9/2012018 0.80 PROD1 DRILL PULD T PJSM, PD BHA #6 with 2.74 D-331 0.0 62.0 16:18 17:06 ridgeset with up cutters on 1° AKO motor. No agitaor 9/20/2018 9/20/2018 1.60 PROD1 DRILL TRIP T RIHw/BHA#6 62.0 8,407.0 17:06 18:42 9120/2018 9/20/2018 0.20 PROD1 DRILL DLOG T Log K1 for -17.5' correction, PUW = 8,407.0 8,438.0 18:42 18:54 34K, close EDC 912012018 9/20/2018 0.50 PROD1 DRILL TRIP T Cotinue RIH to 8811', rate in = 1.8 8,438.0 8,811.0 18:54 19:24 bpm, FS = 513 psi, BHP = 3926 psi, WHP = 215 psi, clean through window (entire BHA), PUW = 37K, pull BHA back up through window, clean, RBIH 9/20/2018 9/20/2018 0.30 PROD1 DRILL TRIP T Continue FCO, FS = 510 psi, BHP = 8,811.0 8,876.0 19:24 19:42 3952, CWT = 17.5K Stack weight at: 8850', WOB = 2K, PUW = 37K 8,863', WOB = 2.5K, PUW = 37K 8850', WOB = 4.8K, PUW = 37K 8876', WOB = 2.6K, PUW = 38K, dragging negative WOB (-7K), dp = 1130 psi 9/20/2018 9/20/2018 0.80 PROD1 DRILL TRIP T Pump 5x5 sweeps, frac sand over 8,876.0 8,952.0 19:42 20:30 shakers, wiper up through window, RBIH Slack weight at 8869', packing off, PUW = 40K, majority dirt w/ free sand over shaker, pump 5x5 sweeps, stack at 8913% continue to take small bites & pull BHA wipers, begun to pack off at 8853', begin to go into stall 9/20/2018 9/20/2018 1.10 PROD? DRILL WPRT T Wiper to 7600', PUW = 38K, large 8,952.0 8,952.0 20:30 21:36 quantities of frac sand over shakers, RBIH 9/20/2018 9/20/2018 0.80 PROD1 DRILL TRIP T Continue FCO, FS = 516 psi, BHP = 8,952.0 9,160.0 21:36 22:24 4000 psi, pump 5x5 sweeps, stack at 9158', PUW = 50K, stack higher at 9144', begin packing off& dragging heavy 9/20/2018 9/20/2018 0.30 PROD1 DRILL WPRT T Wiper, PUW = 40K, packing off at 9,160.0 9,160.0 22:24 22:42 8811', jog down -hole, continue wiper to 8500', jog down to 8700', RBIH, stack weight 8850'- 8875', work interyal, stack multiple times at 9148' 9!20/2018 9/2112018 1.30 PROD? DRILL TRIP T Continue from 9160', FS = 515 psi, 9,160.0 9,173.0 22:42 00:00 BHP = 4032 psi, Page 6/37 ReportPrinted: 10116120181 . Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sort Tmre End Time Our (hr) Phase Op Cade Activity Code Time P -T -x Operation Start Depth (fIKB) End Depth (W -B) 9/21/2018 9/21/2018 0.20 PROD1 DRILL TRIP T Working back down to 9173', FS = 9,173.0 9,174.0 00:00 00:12 500 psi, BHP = 4037 psi, difficulty working back to 9173', short pack -off events, dragging heavy on PU's 9/21/2018 9/21/2018 1.20 PROD1 DRILL WPRT T Begin 400' wiper, PUW =41 K, pack- 9,174.0 8,700.0 00:12 01:24 off at 8900' while PUH, unable to maintain 1.8 bpm as ECD climbs to 14 ppg, able to orient, have reduced flow out, drop speed to 2 fpm up -hole, allow flow to erode pack -off increasing rate as BHP allows, Work through pack -off, take 60 bbl to tiger tank (1.25 bottoms up, density out looks good), pull through window, clean 9/21/2018 9/21/2018 2.20 PROD1 DRILL CIRC T Pump sweeps, pull up to 7600'(50 8,700.0 8,700.0 01:24 0336 fpm), circulate bottoms up, repeat jog to 7600' (100 fpm), signifcant frac sand over shakers, trace amounts of small glass/epoxy type pieces in cuttiings (puple in color, -1/4" in size) 9/21/2018 9/21/2018 1.40 PROD1 DRILL TRIP T RBIH, taking small bites, followed by 8,700.0 9,019.0 03:36 05:00 short BHA wiper attempting to work fill above BHA, working down to 9174', pumping 5x5 sweeps, FS = 505 psi, BHP = 4021 psi 9/21/2018 9/21/2018 0.70 PROD1 DRILL TRIP T Continue working down from 9019' 9,019.0 9,120.0 05:00 05:42 9/21/2018 9121/2018 0.40 PROD1 DRILL TRIP T Pull wiper to window and back in 9,120.0 9,120.0 05:42 06:06 9/21/2018 9/21/2018 0.90 PROD1 DRILL TRIP T 9120 Small bites 10 - 20 fl. then BHA 9,120.0 9,177.0 06:06 07:00 Wiper 9/21/2018 9/21/2018 0.30 PROD1 DRILL TRIP T Pull wiper to window at 8850 pulling 9,177.0 9,177.0 07:00 07:18 heavy, Packing off, try cleaning up area, work pipe, recip 9/21/2018 9121/2018 1.50 PROD1 DRILL TRIP T Still looks like packing off but now 9,177.0 8,720.0 07:18 08:48 suspect packing at surface, Open tango valves to obtain back up WHIP, Well head not at zero as shown by normal gauge, returns been at 1 for 1. Packed off upstream from WHIP transducer 9/21/2018 9/21/2018 0.50 PROD1 DRILL CIRC T 6720, in casing, circ bottoms up while 8,720.0 8,629.0 08:48 09:18 pulling up hole 9/21/2018 9/21/2018 2.60 PROD1 DRILL SVRG T Bottoms up clear, Shut down and blow 8,629.0 8,629.0 09:18 11:54 down mico motion. No good. Break out micro motion. Run snake through it. Was clear. Inspect reducing nipple upstream of micro motion. Packed tight with resin chunks. Break hardline apart and dear. Put everything back together. Change out WHP transducer by MP 13 9/21/2018 9/21/2018 0.90 PRODt DRILL TRIP T Break circulation, Trip in to 8890 clean 8,629.0 8,890.0 11:54 12:48 through window, PUH to inspect choke, Swap to choke A and service choke B 9/21/2018 9/21/2018 0.90 PROD1 DRILL TRIP T RBIH to 9146, PUH Micro motion 8,890.0 8,698.0 12:48 13:42 plugging off, By pass micro motion 9/21/2018 9121/2018 0.90 PROD1 DRILL TRIP T RIH, 1.8 BPM, run down to 9150 and 8,698.0 9,202.0 13:42 14:36 wipe up to 9103, RBIH to 9192 work down to 9202 Page 7/37 ReportPrinted: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sian Depm Start Time End Time our (hr) Phase Op Code Acfivity Code Time P -T -X Operabw (KKB) End Depth (WB) 9/21/2018 9/21/2018 1.70 PROD1 DRILL TRIP T 9202, PUH to 8860 work pipe down 9,202.0 8,750.0 14:36 16:18 stacking out4.6K DHWOB. Pick up to 52K, continue trying to go down. No go. Work up to 8762. Unable to go down or up. 9/21/2018 9/21/2018 0.30 PRODi DRILL CIRC T Shut down pump to relax motor stall. 6,750.0 8,750.0 16:18 16:36 Work down. Unable to move up or down. Unable to get air through micro motion after trying o Flush with water. Work up to 70K 9/21/2018 9/21/2018 1.40 PROD1 DRILL CIRC T Continue working on micro motion. 8,750.0 8,750.0 16:36 18:00 Pump sweeps in preparation for LVT 9/21/2018 9/21/2018 1.00 PROD1 DRILL CIRC T Confer with town, pumps sweeps, 8,750.0 8,744.0 18:00 19:00 circulate 1.5 bottoms up after sweeps exit bit, pump 14 bbl LVT, 5 bbl out the bit (top @ -7718'), drop pumps, shut in choke, let soak, BHP climbs to 4600 psi, WHP climbs to 1727 psi, work pipe upt to 80K, 2 bbl more LVT out the b8, let soak in tension, break free at 70K tension, stuck again at -8742' Gather manual straps of pits (MM bypassed), strap indicates 1 bpm losses, reduce rate to 1 bpm 9/21/2018 9/21/2018 1.70 PROD1 DRILL CIRC T 7 bbl LVT total out bit (top = 7301'), 8,744.0 8,744.0 19:00 20:42 can orient, let soak in tension, 11 bbl LVT out the bit, let soak in tension, work pipe, let soak in compression, pump additional LVT in compression, all LVF out, let soak, work pipe, no success, Begin working pipe pumping again, no success 9/21/2018 9/21/2018 1.00 PROD1 DRILL CIRC T Confer with town on plan forward, 8,744.0 8,744.0 20:42 21:42 build low vis sweeps and plan to pump while in compression 9/21/2018 9/21/2018 1.70 PRODt DRILL CIRC T Pump 10x10 (1.8 bpm) in 8,744.0 8,744.0 21:42 23:24 compression, -1 bpm losses, BHP = 4000 psi, WHIP = 604 psi, WOB = 8K, with sweep well above BHA begin working pipe, no success 9/21/2018 9/22/2018 0.60 PROD1 DRILL CIRC T PJSM, discuss plan to pump down the 8,744.0 8,744.0 23:24 00:00 back -side, targeting 2200 psi WHP, ensure coil has trapped pressure, watch dp over ( not to exceed Max dp over EDC = 1400 psi), bring WHP to 2600 psi, work pipe, no success, sit in -10K CWT compression 9/22/2018 9/22/2018 2.50 PRODi DRILL CIRC T Continue in compression, pumping 8,744.0 8,744.0 00:00 02:30 down back -side, work pipe in down- hole direction, no success, work WHP & pipe, sit in compression, continue to work in down direction 9/22/2018 9/22/2018 1.40 PROD1 DRILL CIRC T Work pipe up -hole, no success 8,744.0 8,744.0 02:30 03:54 9/22/2018 9/22/2018 3.20 PROD1 DRILL CIRC T Confer w/ town, decision made to 8,744.0 8,744.0 03:54 07:06 open EDC, circulate, mobilize BOT to fish SBHP: BHP= 4427 psi, TVD -sensor= 6314.84, EMW = 13.5 ppg Page 8137 Report Printed: 1011512018 - Operations Summary (with Timelog Depths) 31-01 e Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan DePth Stan Time End Tune our (hr) Phase Op Code Actively Cade Tim P -T -X Operation (WB) End Depth (KKB) 9/22/2018 9122/2018 0.10 PRODi DRILL CIRC T Shut down pump, Close EDC, work 6,744.0 8,744.0 07:06 07:12 pipe -16 to +80 3 cycles, no movement 9122/2018 9/22/2018 1.20 PROD1 DRILL PRTS T Perform static pressure test, Inial #'s 8,744.0 8,744.0 07:12 08:24 WHP=1426, EMW=13.12, Bleed off WHP to 600 PSI, BHP to 4118 after 10 minutes, 2nd bleed HP down to 3783PSI, Built up to 4096 After 10 minutes. Bleed 3rd time 3714PSI build to 4074 PSI after 10 minutes. Bleed off while working pipe. Final PT after 20 minutes 3775 PSI, EMW=12.28 9/22/2018 9122/2018 0.20 FROM DRILL FISH T Send release tool command, See data 8,744.0 8,744.0 08:24 08:36 drop off, Pick up free @ 42K. Subtract 46.3' from counters. tool left in hole 9/22/2018 9/22/2018 0.90 PROD1 DRILL SVRG T Blow down MM and lines. Pull off 8,744.0 8,744.0 08:36 09:30 micro motion and snake out more resin pieces. reinstall 9/2212018 9/22/2018 1.40 PRODi DRILL TRIP T POOH with CTC, UQC, LQC, DBV, 8,744.0 9.0 09:30 10:54 Wear sub, P&C, upper portion of EDC, 15.99', Left in hole, D -3312.740D mill, 2 3/8" molar, flapper valve sub, Hydraulic orienter, Drilling gamma sub, Drilling performance sub, lower setion of EDC. Length 46.33' 9/22/2018 9/22/2018 0.40 FROM DRILL PULD T At surface, close swab, Pull BHA #6 9.0 0.0 10:54 11:18 from well and lay down 9/22/2018 9122/2018 2.20 PROD1 DRILL PULD T PJSM, M/U BHA#7 with 21/2"GS, 0.0 68.0 11:18 13:30 Up Down jars, weight bars, Accelorater with coil trac. Pressure deploy, Surface test 9/22/2018 9/22/2018 1.60 PRODi DRILL TRIP T Trip in hole, EDC shut pumping min 68.0 8,400.0 13:30 15:06 rate 9/22/2018 9/22/2018 0.20 PROD1 DRILL DLOG T Log Ki for -15', PUW=35K 8,400.0 8,423.0 15:06 15:18 9122/2018 9/22/2018 0.30 PROD? DRILL TRIP T Continue in well, Set down @ 8711', 8,423.0 8,711.0 15:18 15:36 PUH to confirm latch 9/22/2018 9/22/2018 3.50 PROD1 DRILL FISH T Begin jarring down for 15 cycles at 8K 8,711.0 8,711.0 15:36 19:06 down no movement. Begin jaring down and up, 62K up 0 down, continue jarring 60 cycles, dump well- head pressure to zero, attempt 10 more licks, release off GS to perform pipe fatique management 9/22/2016 9/22/2018 1.50 PRODi DRILL TRIP T POOH 8,711.0 65.0 19:06 20:36 9122/2018 9/22/2018 1.00 PROM DRILL PULD T PJSM, PUD BHA #7 65.0 0.0 20:36 21:36 9/2212018 9/22/2018 1.40 FROM DRILL CIRC T MU no&e, stab on, roll coil to fresh 0.0 0.0 21:36 23:00 water, jet stack, pop off, clear floor 9/2212018 9/2312018 1.00 FROM DRILL BOPE P PJSM, function test BOPE's, clear 0.0 0.0 23:00 00:00 floor, begin change out ring on love - joy (in SIMOPS) 9/23/2018 9/23/2018 0.50 PROD1 DRILL RGRP T Continue work on love -joy (chiming 0.0 0.0 00:00 00:30 out ring) 9/23/2018 9/23/2018 __[7D1 DRILL CTOP T Epoxy & heat shrink a -line end, slide 0.0 0.0 00:30 01:30 cart in, stab on, pump slack back, up to 3 bpm (4500 psi), heard a -line rattling Page 9/37 ReportPrinted: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log ft De Stert Depth Sled Time End Tone our hr ( ) Phase O Code p Activit Code y Tire P -T -X Operation End Depth (aKB) 9/23/2018 9/23/2018 3.00 PROD1 DRILL CTOP T Pop off, rig up hydraulic cutter, cut 0.0 0.0 01:30 04:30 coil, found a -line in 35', cut total of 300' of pipe, dg down cutter, make final hand cut, test a -line, ream coil, install Kandla connector, dimpler broke ram shaft, replace. Pull Test to 70K 9/23/2018 9/23/2018 0.90 PROD1 DRILL CTOP T Re -head a -line, / UQC PT to 4000PSI 0.0 0.0 04:30 05:24 9/23/2018 9/23/2018 0.80 PROD1 DRILL CTOP T Make up n=le. stab on, displace coil 0.0 0.0 05:24 06:12 back to mud. 9/23/2018 9123/2018 1.30 PRODt DRILL PULD T PJSM, M/U BHA#8 with 2.5" GS and 0.0 54.4 06:12 07:30 2.13 Hipp Tripper. M/U to coil trac. M/U to coil and surface test. Good test. Inspect pack offs. 9123/2018 9/23/2018 1.60 PROD1 DRILL TRIP T RIH BHA#8 54.4 8,390.0 07:30 09:06 9123/2018 9/23/2018 0.20 PROD? DRILL DLOG T Log K1 for -17', PUW=35K, Close 8,390.0 8,401.0 09:06 09:18 1 1 1 EDC 9/23/2018 9123/2018 0.20 PROD? DRILL TRIP T Continue in to top of fish @ 8709 dry, 8,401.0 8,709.0 09:18 09:30 8707 with pumps 912312018 9/23/2018 1.40 PROD1 DRILL FISH T Set down on top offish. PUH to 8,707.0 8,707.0 09:30 10:54 ensure latch, 40K PUW, -7 DHWOB, slack off, bring pump on to check for vibration. 1.11 BPM @ 4050 PSI. work down @.1 R. Stall at 8707. Pick up and restart. Run 2.6 K DHWOB. Start 8 BBI slug of LVF down CT. continue working in compression 9/23/2018 9/23/2018 1.00 PROD? DRILL FISH T Shut down and let LVF soak around 8,707.0 5,707.0 10:54 11:54 fish 10 minutes, continue hipp tripping down. .97 BPM @ 4039 PSI. 9123/2018 9/23/2018 0.60 PROD1 DRILL FISH T Start working Hip Tripper in tension. 8,707.0 8,707.0 11:54 12:30 61 K, DHWOB=-19K. Continue slowly increaseing tension to 70K then work up and down 9/23/2018 9123/2018 0.20 PROD1 DRILL FISH T Stall, PU and release, possibly have 8,707.0 8,707.0 12:30 12:42 top offish @ 8505 9/23/2018 9/23/2018 0.30 PROD1 DRILL FISH T Continue to workwork down 8,707.0 8,707.0 12:42 13:00 9123/2018 9/23/2018 0.10 PROD? DRILL FISH T Releae from fish. PUH for tie in 8,707.0 8,380.0 13:00 13:06 9/23/2018 9123/2018 0.10 PROD? DRILL CLOG T Log K1 for+5' 8,380.0 8,409.0 13:06 13:12 9/23/2018 9/23/2018 0.20 PROD1 DRILL TRIP T RBIH to confirm TOF, Latch dry @ 8,409.0 8,709.0 13:12 13:24 8709 dry. Fish has not moved 9/23/2018 9/23/2018 0.30 PRODt DRILL FISH T Hip tripper loosing action. Start 8,709.0 8,695.0 13:24 13:42 working pipe up to 80K observed fish letting go weight droped to 26K. PUH still latched fish lodged. work pipe up to 85 K and down 9123/2018 9/23/2018 0.20 PROD1 DRILL TRIP T PUH to tie in 8,695.0 8,380.0 13:42 13:54 9/23/2018 9/23/2018 0.10 PROD1 DRILL DLOG T Log k1 for =1.5' 8,380.0 8,407.0 13:54 14:00 9/2312018 9123/2018 0.20 PROD1 DRILL FISH T RBIH to check top of fish. Tag up @ 8,407.0 8,698.0 14:00 1412 8698. Fish has moved up hole. Work pipe to 80 K 9/23/2018 9/23/2018 1.90 PROD1 DRILL TRIP T Release from fish, POOH BHA #8 for 8,698.0 35.4 14:12 16:06 Jars 9/23/2018 9/23/2018 1.20 PROD1 DRILL PULD T At surface, PJSM, PUDBHA#8 35.4 0.0 16:06 17:18 Page 10137 ReportPrinted: 1011512018 Operations Summary (with Timelog Lepths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start rime End Time Dur (M) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (fi(B) 9/23/2018 9/23/2018 0.30 PROD1 DRILL PULD T PJSM, PU & put BOT up/down jars, 3 0.0 25.0 17:18 17:36 weight bars, & acoellerator in-hole 9/23/2018 9/23/2018 1.80 PROD1 DRILL RGRP T Change out goose -neck rollers, crew 25.0 25.0 17:36 19:24 change out 9123/2018 9/23/2018 1.20 PROD1 DRILL PULD T PD BHA #9 (aceleator, 3 weight bars, 25.0 66.0 19:24 20:36 up/down jars), slide in cart, check pack -offs, good, MU to coil, tag up, set counters 9/23/2018 912312018 1.60 PROM DRILL TRIP T RIH w/ BHA#9 66.0 8,400.0 20:36 22:12 9/23/2018 9/23/2018 0.30 PROD1 DRILL DLOG T Log K1 for -16' correction, PUW = 8,400.0 8,422.0 22:12 22:30 35K, attempt to Gose EDC, position error on EDC, calibrate, EDC closed 9123/2018 9/23/2018 0.20 PROD1 DRILL TRIP T RIH, tag & latch into fish at 8699' 8,422.0 8,698.0 22:30 22:42 9/23/2018 9/24/2018 1.30 PRODi DRILL FISH T Jar down on fish (20 licks), no 6,698.0 8,698.0 22:42 00:00 success, jar up 15 (16 licks), sit in tension @ 80K 9/24/2018 9124/2018 1.90 PROM DRILL FISH T Prep LVT(sitting in 80K tension), drop 8,698.0 8,698.0 00:00 01:54 to nuetral weight, pump 14 bbl LVT, w/ 14 bbl LVT out bit, bullhead LVT 7 bbl below fish (.25 bpm, 2500 psi WHIP) 9124/2018 9/24/2018 0.60 PROD1 DRILL FISH T Work jars down (10 licks down to -1 OK 8,698.0 8,698.0 01:54 02:30 WOB), work jars up (10 licks) 9124/2018 9/24/2018 0.70 PROD1 DRILL FISH T Bullhead remaining 7 bbls LVF below 8,698.0 8,698.0 02:30 03:12 fish 9/24/2018 912412018 1.00 PROD1 DRILL FISH T Jar up (5 licks), jar down (5 licks), 8,698.0 8,698.0 03:12 04:12 increase WHIP to 2500 psi, jar up 5 licks dropping WHIP, pulling to 80K+, no movement on fish 9/24/2018 9/24/2018 1.50 PROD1 DRILL TRIP T POOH w/ BHA #9 (no fish) 8,698.0 63.0 04:12 05:42 9124/2018 9/24/2018 1.40 PROD1 DRILL PULD T At surface, PJSM, PUD BHA#9 63.0 0.0 05:42 07:06 Fishing BHA w/Jars, Lay down BOT tools 9/2412018 9/24/2018 4.40 PROD? DRILL CTOP T PJSM, remove UQC, Boot wire for 0.0 0.0 07:06 11:30 slack mgml, stab on well, Reverse circulate CT. Un Stab injector. WU CT cutter. Cut 14' CT find wire. Cut 200' coil for fatigue mgmt. M/U CTC, Pull test to 70K. Test wire - Good. M/U UQC. PT UQC & CTC 9/24/2018 9/24/2018 4.00 PROD1 DRILL RGRP T Indentified leak in inner reel iron at 3 X 0.0 0.0 11:30 15:30 2 crossover. Remove pressure bulkhead and inner reel iron to replace hardline gasket in hardline. Replace reel iron and pressure bulkhead while waiting on orders 9/24/2018 9124/2018 0.10 PROD1 DRILL CTOP T Obtain 5000 PT on inner reel iron 0.0 0.0 15:30 15:36 9/24/2018 9/24/2018 0.30 PRODt DRILL CTOP T Break off pressure test plate, Install 0.0 0.0 15:36 15:54 1 1 1 Nozzle. P/U QTS off riser 9124/2018 9/24/2016 0.10 PROM DRILL CTOP T Test E -line & polarity post pressure 0.0 0.0 15:54 16:00 bulkhead - Good 9/2412018 9/24/2018 0.50 PRODi DRILL PULD T Swap out BHA in PDL from Hip tripper 0.0 0.0 16:00 1630 run to at whipstock 9/24/2018 9/24/2018 1.50 PROD? DRILL WWSP T Check all tree finge bolts for torque 0.0 0.0 16:30 18:00 9/24/2018 9/24/2018 0.80 PRODi DRILL SFTY T Crew change, run valve check list. 0.0 0.0 18:00 18:48 Prep to make up whipstock 9/24/2018 9124/2018 1.50 PROD1 RPEQPT PULD P PJSM, M1U whipstock and pressure 0.0 73.4 18:48 20:18 deploy. M/U to CT and surface test. Tag up and set counters Page 11/37 Report Printed: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our (hr) Pilose Op code ACUvity Code Time P-T-X Operation (ftKB) End Depth (MR) 9/24/2018 9/24/2018 1.90 PROD1 RPEQPT TRIP P Trip in well, BHA # 10 Whipstock 73.5 8,410.0 20:18 22:12 9/24/2018 9/24/2018 0.20 PROD1 RPEQPT DLOG P Log tie in for -15' 8,410.0 8,444.2 22:12 22:24 9/24/2018 9/24/2018 0.30 PROD1 RPEQPT TRIP P Continue in well, Get to setting depth 8,444.2 8,692.5 22:24 22:42 6692.5, TOWS @ 8682 oriented to high side. Shut EDC. Bring pumps online. See tool shift @ 5100 PSI. DHWOB=4K. Lift off whipstock 9/24/2018 9/25/2018 1.30 PROD1 RPEQPT TRIP P POOH after setting whipstock 8,692.5 78.0 22:42 00:00 9/25/2018 9/25/2018 1.00 PROD1 RPEQPT PULD P PJSM, PUD BHA#10 78.0 0.0 00:00 01:00 9/25/2018 9/25/2018 1.10 PROD1 WHPST PULD P PD BHA#11 Window Milling Assembly 0.0 74.0 01:00 02:06 #1 (0.6° AKO motor, string reamer, window mill) 9/25/2018 9/25/2018 1.60 PRODi WHPST TRIP P RIH w/BHA#11 74.0 8,409.0 02:06 03:42 9/2512018 9/25/2018 0.30 PRODi WHPST CLOG P Log K1 for-18' correction, PUW = 8,409.0 8,435.0 03:42 04:00 36K, close EDC, RIW = 18K 9/25/2018 9/25/2018 0.20 PROD1 WHPST TRIP P Contiue RIH, dry tag TOWS @ 8681', 8,435.0 8,680.0 04:00 04:12 PUW = 37K, bring up rate, RBIH to begin milling 9125/2018 9/25/2018 2.40 PROD1 WHPST WPST P Milling window, 1.8 bpm, FS = 417 psi, 8,680.0 8,681.5 04:12 06:36 BHP = 4004 psi, WHP = 522 psi, stall getting started @ 8680.4', PU, RBIH & begin time milling 8680.2, WOB = 1.5K, metal over shakers, begin taking slight losses, lower WHIP to achieve 1 for 1 returns PU to swap pumps (leaking pop-oft), RBIH & continue milling, mill to 8681.5', stall, PUW = 36K, RBIH 9/25/2018 9/25/2018 3.00 PROD? WHPST WPST P Continue milling from 8681.5', 1.8 8,681.5 8,683.9 06:36 09:36 bpm, FS = 417 psi, BHP = 3883 psi, WOB = 2K-3K, stall at 8683.9', PUW = 36K, RBIH 9/25/2018 9/25/2018 2.90 PROD1 WHPST WPST P Continue milling from 8683.9', 1.8 8,683.9 8,686.2 09:36 12:30 bpm, FS = 420 psi, BHP = 3903 psi, WHIP = 455 psi, CWT = 18K, WOB = .91K, stall at 8684'(2 times) 9/25/2018 9/25/2018 0.60 PROCt WHPST REAM P Make 3 reaming passes on first 6' of 8,686.2 8,686.2 12:30 13:06 window @ HS, 1 fpm, PUW = 37K, pump 5x5 sweeps, dry drift up & down, clean 9/25/2018 9/25/2018 1.50 PROD1 WHPST TRIP P POOH, open EDC 8,686.2 74.0 13:06 14:36 9/25/2018 9/25/2018 0.80 PROD1 WHPST PULD P PJSM, PUD BHA#11, LD tools, clear 74.0 0.0 14:36 15:24 Floor, string reamer & mill both came mill came out 2.80" no-go 9/25/2018 9/25/2018 3.00 PROD1 WHPST WAIT P Wait on Weatherford motor 0.0 0.0 15:24 18:24 9/25/2018 9/25/2018 1.80 PROD1 WHPST PULD P 1.25° Fitted motor on location, PJSM, 0.0 77.0 18:24 20:12 PU & PD BHA#12, skid cart, check packoffs - good, tag up, set counters, " Fat radis speed mill, 2.80" no go, new string mill SN5284634, 2.80" no Igo 9/25/2018 9/25/2018 1 1.70 PROD1 WHPST TRIP P RIH W BHA#12, second window 77.0 8,410.0 20:12 21:54 1 I I milling assembly #2. 9/25/2018 9/25/2018 0.20 PROD1 WHPST DLOG P Tie into K1 markerfor-17.5' 8,410.0 8,434.2 21:54 22:06 i correction. Page 12137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log star Depth Sten Tare End Time our (hr) Phase Op Gods Actmty Code Time P-T-X Operation (ftKB) End Depth (flKB) 9/25/2018 9/25/2018 0.50 PROD1 WHPST TRIP P PU W136 k lbs, close EDC. Continue 8,434.2 8,687.0 22:06 22:36 to RIH. 9/25/2018 9/26/2018 1.40 PROD1 WHPST WPST P RIH Wt 18k lbs, CT 4343 psi @ 1.79 8,687.7 8,688.5 22:36 00:00 bpm, Free spin diff 628 psi, Annular 4018 psi, WH 576 psi, IA 616 psi, OA 174 psi. See WOB @8687.74 OBD per pan, WOB 0.44 k lbs, CT Wt 18.82, WOB .6 -.2 k lbs 9/26/2018 9/26/2018 0.70 PRODi WHPST WPST P CT 3991 psi @ 1.79 bpm, annular 8,688.5 8,689.2 00:00 00:42 4022 psi, WH 570 psi, OBD CT Wt 19 k lbs, WOES -.2 k lbs - fallowing milling schedule. 9/26/2018 9/26/2018 3.80 PROD1 WHPST WPST P Engage auto drill, CT 3980 psi @ 1.79 8,689.2 8,693.5 00:42 04:30 bpm, annular 4022 psi, WH 573 psi, OBD CT Wt 16.8 k lbs, WOB 0.2 -1.7 k Ibs- 9/26/2018 9/26/2018 2.50 PROD1 WHPST WPST P CT 4094 psi @ 1.79 bpm, annular 8,693.5 8,706.0 04:30 07:00 4025 psi, WH 580 psi, OBD CT Wt 15.6 k lbs, WOB 2.37 k lbs, WOB fell off @ 8693.5 TD rat-hole at 8706', pump sweeps 9/26/2018 9/26/2018 2.50 PROD1 WHPST REAM P Make reaming passes HS (-90 psi 8,706.0 8,706.0 07:00 09:30 motor work @ 8688' up & down), 30° L. 30°R, & LS, pump sweeps 9/26/2018 9/26/2018 1.80 PROD1 WHPST TRIP P POOH, PUW = 37K, open EDC, PJSM 8,706.0 74.0 09:30 11:18 9/26/2018 9/26/2018 1.10 PROD1 WHPST PULD P PUD BHA#12 (cross-training), string 74.0 0.0 11:18 12:24 reamer & mill came out 2.79 no-go 9/25/2018 9/26/2018 2.10 PROD1 DRILL CIRC P Clear rig floor, MU nozzle, stab on, 0.0 0.0 12:24 14:30 displace coil to fresh water, jet stack, pop off, break off nozzle, pull checks, grease tree, grease bravo & romeo valves, fluid pack 9126/2018 9/26/2018 6.50 PROD1 DRILL BOPE P BOPE test (witness waived by Jeff 0.0 0.0 14:30 21:00 Jones of AOGCC), test pressure 4900 psi, annular 2500 psi, cycle choke D to hold pressure, upper 2-3/8" rams, fail / pass, needed cycling once, some evidence that the test joint is being worn by the deployment ram slips. ""Start test 14:30 - End 21:00 9/26/2018 9/26/2018 0.70 PROD1 DRILL BOPE P Skid cert, stab on, test inner reel iron, 0.0 0.0 21:00 21:42 9/26/2018 9/26/2018 0.80 PRODi DRILL DISP P Tum reel over to mud unstab 0.0 0.0 21:42 22:30 9/26/2018 9/26/2018 1.20 PROD1 DRILL PULD P PU & PD BHA#13, AL-03 build drilling 0.0 59.0 22:30 23:42 assembly, 1.8° AKO over RR baker bi center, inspect pack offs, tag up, set counters. 9/26/2018 9/2712018 0.30 PROD1 DRILL TRIP P RIH, while swapping coil to new mud 59.0 1,174.0 23:42 00:00 (system #2) exporting returns to the flger tank. 9127/2018 9/27/2018 1.30 PROD1 DRILL TRIP P Continue to RIH, while swapping coil 1,174.0 8,400.0 00:00 01:18 to new mud (system #2) exporting returns to the tiger tank. 9/27/2018 9/2712018 0.20 PROD1 DRILL DLOG P Tie into Kl marker for-18.5' 8,400.0 8,417.8 01:18 01:30 1 1 1 I correction. 9/27/2018 9127/2018 0.50 PROD1 DRILL TRIP P Continue to RIH displacing coil to new 8,417.8 8,706.0 01:30 02:00 1 1 I mud, ssytem #2, PU Wt, 35 k lbs, close EDC,continue to RH Page 13137 Report Printed: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log S� Depin Stan Time Ertl Time our hr ( I Phase Op Code ACEvtly Code Time P -T -X Operation (flKB) End Depth (flKB) 9/27/2018 9/27/2018 1.30 PROD1 DRILL DRLG P RIH Wt 18 k lbs, CT 3802 psi @ 1.79 8,706.0 8,825.0 02:00 03:18 bpm, Free Spin diff. 451 psi, WH 427 psi, IA 614, OA 173. Annular 3988 psi OBD, CT Wt 17 k Ibs,WOB1.7 k lbs, ROP 90 ft/hr Average ROP over interval on bottom 91 ft/hr 9/27/2018 9/27/2018 0.20 PROD1 DRILL WPRT P DD wiper, PU 37 k lbs, Turn around @ 8,825.0 8,825.0 03:18 03:30 8769', RBIH 9/27/2018 9/27/2018 2.30 PROD1 DRILL DRLG P RIH Wt 19 k lbs, CT 3682 psi @ 1.80 8,825.0 9,055.0 03:30 05:48 bpm, Free Spin diff. 455 psi, WH 455 psi, annular 4027 psi OBD, CT Wt 17 k Ibs,WOB1.8 k lbs, ROP 100 ft/hr Pumped 5x5 sweep, pulled 100' bha wiper, PU 41 k lbs. Drill to called TD of build @ 9055' 9/27/2018 9/27/2018 2.00 PROW DRILL TRIP P Pump sweeps, POOH, PJSM 9,055.0 72.0 05:48 07:48 9/27/2018 9/27/2018 1.20 PROD? DRILL PULD P PUD BHA#13, bit came out a 1-1 72.0 0.0 07:48 09:00 9/27/2018 9127/2018 1.20 PROD1 DRILL PULD P PD BHA#14 (Agitator, 0.5° AKO 0.0 78.0 09:00 10:12 motor, new P104 bit), slide in cart, check pack -offs, MU to coil, tag up 9127/2018 9/27/2018 1.50 PROD1 DRILL TRIP T RIH w/ BHA#14, shallow test @ 500', 78.0 78.0 10:12 11:42 1.8 bpm @ dp = 1800 psi, RIH to 600', 1.8 bpm @ dp = 2150 psi (should be -1000 psi) Begin POOH, shut down pumps to close EDC, bore pressure drops (-350 psi dp), bleeder on pump #1 leaking, swap to mud pump #2, appears as though upper checks may not be holding, POOH 9/27/2018 9/27/2018 1.00 PROD1 DRILL PULD T PJSM, PUD BHA #14 78.0 0.0 1142 1242 9/27/2018 9/27/2018 0.70 PROD1 DRILL OTHR T Agitator & motor function when blown 0.0 0.0 12:42 13:24 down w/ 120 psi air, MU/PU new Coil Track tools, change out checks in UQC (obvious slop in one check) 9/27/2018 9/27/2018 1.20 PRODI DRILL PULD T PD BHA#15 (New CoilTrack new 0.0 78.0 13:24 14:36 agitator, new 0.5° motor, P104 bit), cross -training, slide in cart, MU to coil, tag up, set counters 9/27/2018 9/27/2018 1.60 PRODt DRILL TRIP P RIH w/ BHA#15, shallow test tools @ 78.0 8,400.0 14:36 16:12 515', 1.8 bpm, dp = 900 psi, unload ODS PDL 9/27/2018 9127/2018 0.30 PROD1 DRILL DLOG P Log Kt for -16' correction, PUW = 8,400.0 8,426.0 16:12 16:30 40K, log RA at 8687.5', TOWS = 8680', PUW = 42K @ 8950' 9/27/2018 9/27/2018 0.40 PROD1 DRILL TRIP P Cotinue to RIH 8,400.0 9,055.0 16:30 16:54 9/27/2018 9/27/2018 1.30 PROD1 DRILL DRLG P OBD, RIW = 17K, 1.8 bpm, dp = 960 9,055.0 9,106.0 16:54 18:12 psi, CWT = 15K, WOB = 1.7K, BHP = 3981 psi, WHP = 368 psi, circ pressure = 4159 psi 9/27/2018 9/27/2018 0.10 PROD1 DRILL WPRT P PU Wt 45 k lbs, pick up to get 9,106.0 9,106.0 18:12 18:18 1 I parameters. RBIH Page 14137 Report Printed: 10/15120181 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Torte End Time Dur(h) Phase Op Code Ach*Coca Time P-T-X Operation (HKB) End Depth(nKB) 9/27/2018 9127/2018 2.00 PRODi DRILL DRLG P RIH Wt 17 k lbs, Ct 4194 psi, @ 1.80 9,106.0 9,305.0 18:18 20:18 bpm, free spin 965 psi,annular 3989 psi, WH 302 psi, IA 630, OA 180. BOBD, CT Wt 15.2 k lbs, WOB 1.04 k Is, ROP 100 ft/hr ROP over interval drilled 99.5 ft/hr 9/27/2018 9127/2018 0.20 PRODt DRILL WPRT P PU Wt 39 k lbs, 1 st scheduled wiper 9,305.0 9,305.0 20:18 20:30 after 250'ddlled. PU 250' to EOB, RBIH No signs of frac sand in returns. 9/27/2018 9127/2018 2.70 PROD1 DRILL DRLG P Ct 4386 psi, @ 1.80 bpm, free spin 9,305.0 9,570.0 20:30 23:12 990 psi,annular4091 psi. BOBD, CT Wt 15 k lbs, WOB 1.4 k Is, ROP 140 ft/hr ROP over interval drilled 98 R/hr 9465 PU 44 k lbs No signs of frac sand in returns. 9/27/2018 9/27/2018 0.40 PROD1 DRILL WPRT P PU W139 k lbs, 2nd scheduled wiper 9,570.0 8,700.0 23:12 23:36 after 250' drilled. PU 870' No signs of frac sand in returns. 9/2712018 9/27/2018 0.10 PROD1 DRILL DLOG P Log RA for+ 1.5' correction 8,700.0 8,727.1 23:36 23:42 9/2712018 9/28/2018 0.30 PROD1 DRILL WPRT P RBIH 8,727.1 9,557.0 23:42 00:00 9/28/2018 9/28/2018 0.10 PRODII DRILL WPRT P RBIH 9,557.0 9,570.0 00:00 00:06 9/28/2018 9/2812018 2.20 PROD1 DRILL DRLG P Ct psi, @ 1.78 bpm, free spin 897 9,570.0 10,005.0 00:06 02:18 psi,annular 4047 psi. BOBD, CT Wt 10 k lbs, WOB 1.8 k Is, ROP 200 ft/hr ROP over interval drilled 198 R/hr 9720 PU 40 k lbs - 100' BHA wiper " 9,711' pinched choke from 12.3+ to 12.4 ppg 9796', pinched choke to 12.5 ppg No signs of frac sand in returns. 9/28/2018 9/28/2018 0.50 PROD1 DRILL WPRT P PU, Wt 40k lbs Wiper#1 10,005.0 8,670.0 02:18 02:48 9/28/2018 9/28/2018 0.40 PROD1 DRILL WPRT P Park @ 8670', - 6243.67 TVD. 8,670.0 8,670.0 02:48 03:12 Monitor BHP, Pressure climbed from 4088 psi to 4110 psi - " 12.66 ppg EMW 9/282018 9/28/2018 0.50 PRODt DRILL WPRT P RBH, targeting 12.7 ppg EMW @ the 8,670.0 10,005.0 03:12 03:42 window. 9/28/2018 9/282018 1.70 PROD1 DRILL DRLG P Ct 4384 psi, @ 1.78 bpm, free spin 10,005.0 10,258.0 03:42 05:24 881 psi, annular 4191 psi, WH 427 psi. OBD, CT Wt 12 k lbs, WOB 2 k lbs, ROP 150 R/hr PU 40 k lbs. 9128/2018 9/28/2018 1.00 PROD1 DRILL DRLG P Ct 4384 psi, @ 1.78 bpm, free spin 10,258.0 10,430.0 05:24 06:24 881 psi, annular 4191 psi, WH 427 psi. OBD, CT Wt 12 k lbs, WOB 2 k lbs, ROP 150 ft/hr PU 40 k lbs. 9/28/2018 j 9/2812018 0.40 PROD1 DRILL WPRT P Scheduled wiper #2 up-hole, PUW = 10,430.0 9,579.0 06:24 06:46 i i 39K 9/28/2018 9/28/2018 0.30 PROD1 DRILL WPRT P Wiper in-hole, RIW = 11K 9,679.0 10,430.0 06:48 0706 Page 15137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time End Time our (hr) Phase Op Code AOivuy Code Time P -T -X Operation (WB) End Depth (W13) 9/28/2018 9/28/2018 1.20 FROM DRILL DRLG P BOBD, CWT= 9K, WOB = 1.3K, BHP 10,430.0 10,598.0 07:06 08:18 = 4276, WHIP = 507 psi, 1 -for -1 returns @ 1.8 bpm, circ pressure = 4736 psi, 12.9 ppg at window, CWT falling off (snubbing -2K CWT), pump sweeps, ROP = 140 fph 9/28/2018 9/28/2018 1.30 PROD1 DRILL DRLG P OBD, BHP = 4350 psi, 1.8 bpm, 1 -for- 10,598.0 10.850.0 08:18 09:36 1 returns @ 12.9 ppg @ window, WOB = 2K, circ pressure = 4767 psi, pump sweeps Decision made to drop tol2.8 ppg & take manual straps (attempting to confirm reservoir is not charging up) 9/28/2018 9/28/2018 0.80 PROD1 DRILL WPRT P Wiper, PUW = 40K, log RA for+4' 10,850.0 8,668.0 09:36 10:24 correction 9/28/2018 9/28/2018 0.50 PRODi DRILL CIRC P Circulate bottoms up 8,700.0 8,669.0 10:24 10:54 9/28/2018 9/28/2018 0.40 FROM DRILL DLOG P Obtain SBHP: bleed down from 13.0 8,669.0 8,669.0 10:54 11:18 ppg to 12.6 ppg (5 times, shut in, MD = 8669', TVD sensor = 6243', MW out = 8.75 ppg, Annular = 4221, EM = 13.0 ppg 9/28/2018 9/28/2018 1.20 FROM DRILL WPRT P Wiper in-hole, CWT weight falling off 8,669.0 10,850.0 11:18 12:30 beginning -10,200', stacking negative CWT by 10,545'thm 10,700', pump sweeps Nabors depth counters sticking, dean & spray down, reset depth to current drilled depth of 10,850'+4' correction (10,854') 9/28/2018 9/28/2018 2.00 PROD1 DRILL DRLG P OBD, 1.8 bpm, FS = 841 psi, CWT = 10,850.0 11,111.0 12:30 14:30 12K, WOB = 1K, BHP = 4344 psi, WHP = 605 psi, pump 5x5 sweeps, BHA wiper, snubbing to get back down, mud system #3 reachest bit at 11,111', PUW = 39K, ROP = 130 fph 9/28/2018 9/28/2018 0.50 FROM DRILL DRLG P OBD, CWT =5K, WOB=.6K, BHP= 11,111.0 11,165.0 14:30 15:00 4420 psi, WHIP = 656 psi, circ = 4590 psi, 13.0 ppg @ window, 9/28/2018 9/28/2018 0.30 PROD1 DRILL TRIP P Wiper up -hole, PUW=39K 11,165.0 10,338.0 15:00 15:18 9/28/2018 9/28/2018 0.30 FROM DRILL TRIP P Wiper in-hole, RIW=9K 10,338.0 11,165.0 15:18 15:36 9/28/2018 9/28/2016 1.40 PROW DRILL DRLG P OBD, 1.8 bpm, CWT =3.5K WOB = 11,165.0 11,304.0 15:36 17:00 1.1K, BHP = 4406 psi, WHIP = 674 psi, circ = 4666 psi 9/28/2018 9/28/2018 0.30 FROM DRILL WPRT P 250' wiper, PUW = 39 K, RIW = 9K 11,304.0 11,304.0 17:00 17:18 9/28/2018 9/28/2018 4.30 PROD1 DRILL DRLG P CT 4615(031.80 bpm, Annular 4449, 11,304.0 11,545.0 17:18 21:36 Free spin 928, WH 624 psi, IA650, OA 200 OBD, CT WT=-7klbs, WOB 0.8k lbs, ROP - 50 ft/hr Drill with many pick ups, troubles turning around and running past 11,357, pumping sweeps. PU weights consistently 45 k lbs. added 15 Lowtorque to active system, no noticeable change in weight transfer. Average ROP over section = 56 ft/hr Page 16137 Report Printed: 1 0/1 512 0 1 8 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (aKB) End Depth (flKB) 9/28/2018 9/28/2016 1.10 FROM DRILL WPRT P Wiper, PUW=45 K, 11,545.0 8,700.0 21:36 22:42 Pull wiper early, chase 5x5 sweep off bottom, time second 5x5 just prior to entering the build. Hole Clean w/ regard to coil weight. No WOB or motor work. 9/28/2018 9/28/2018 0.20 FROM DRILL DLOG P Tie in toRA tag for+1' correction. 8,700.0 8,726.7 22:42 22:54 9/28/2018 9/2812018 0.90 FROM DRILL WPRT P RBH, CT Wt started at 17.7 k lbs / 50 8,726.7 11,545.0 22:54 23:48 ftimin and 1 bpm. CT Wt dropped to 8 k reduced RIH sped to 40 ft/min One small stack out 10,628 @ a TF change Clan trip in 9/28/2018 9/29/2018 0.20 FROM DRILL DRLG P CT 4600@ 1.80 bpm, Annular 4441, 11,545.0 11,550.0 23:48 00:00 Free spin 912, WH 744 psi, IA 656, OA 205 OBD, CT WT = 0 k lbs, WOB 0.7 k lbs, ROP 70 ft/hr Average ROP over section = 25 ft/hr 9/29/2018 9/29/2018 1.70 FROM DRILL DRLG P CT 4600@ 1.80 bpm, Annular 4441, 11,550.0 11,584.0 00:00 01:42 Free spin 912, WH 744 psi, IA 656, OA 205 OBD, CT WT = -7 k lbs, WOB 0.7 k lbs, ROP 70 VITT Observed influx,increased stepwise to 13.3 EMW at the window. Struggling with weight transfer, attempt sweeps, reduced pump rate. Able to make 100-50 ft/hr when on bottom but WOB falls off rapidly. Average ROP over section = 20 ft/hr 9/29/2018 9/29/2018 0.20 PROD1 DRILL WPRT P PU, 40 k lbs - 200'BHA wiper 11,584.0 11,584.0 01:42 01:54 9/29/2018 9/2912018 1.60 PRODi DRILL DRLG P CT 4785@ 1.80 bpm, Annular 4590, 11,584.0 11,655.0 01:54 03:30 Free spin 889, WH 960 psi OBD, CT WT = -7 k lbs, WOB 1-.2 k lbs, ROP 100 ft/hr - when on bottom Able to make 100-50 Whir when on bottom but WOB falls off rapidly. Add alpine beads to Hi -Vis sweep pump 5x5 Average ROP over section = 44 ft/hr 9/29/2018 9/29/2018 0.90 FROM DRILL DRLG P Drilling Break @ 11,660', CT Wt 5.7 k 11,655.0 11,723.0 03:30 04:24 WOB .5 k, ROP 150 - 250 fl/hr, short lived Back to multiple pick ups for short footage CT Wt -7 k lbs, WOB 1-.2 k lbs, ROP 50+ while on bottom Average ROP over section = 75 Whir 9/29/2018 9/29/2018 0.20 FROM DRILL WPRT P PU, 40 k lbs -200' BHA wiper 11,723.0 11,723.0 04:24 04:36 9/29/2018 9/29/2018 0.80 PRODi DRILL DRLG P CT Wt -7 k IDS, WOB 1-.2 k lbs, ROP 11,723.0 11,744.0 04:36 05:24 50+ while on bottom Pumping beads 1 with little effect on weight transfer Page 17137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth StartTime EM Time DW(hd Phase Op Code Activity Code Time P-T-X Opetatian (fixe) End Depth(tl(B) 9/29/2018 9/29/2018 2.40 PROM DRILL DRLG P OBD, 1.8 bpm, FS = 920 psi, CWT=- 11,744.0 11,863.0 05:24 07:48 5K, WOB = 0.6K, BHP = 4576 psi, WHP = 738 psi, circ = 4900 psi, stuggling w/ weight transfer, pumping beaded sweeps as required, continual PU's to continue drilling Suspect micro-motion out drive gain issues, break down MM out 8 blow down, litttle to no improvement 9/29/2018 9/29/2018 0.20 PROD1 DRILL WPRT P 150' wiper, PUW = 37K, RIW = 1O 11,863.0 11,863.0 07:48 08:00 9/29/2018 9/29/2018 1.10 PROD1 DRILL DRLG P OBD, 1.8 bpm, FS = 948 psi, CWT = 11,863.0 11,902.0 08:00 09:06 2K, WOB = 1.2K, BHP = 4531 psi, WHP = 603 psi, circ = 5111 psi, NBI = 97.5°, PUW's = 38K - 43K 9/29/2018 9/2912018 0.30 PROD1 DRILL WPRT P 200' wiper, PUW = 39K, RIW = 11K 11,902.0 11,902.0 09:06 09:24 9/29/2018 9/29/2018 0.40 PROM DRILL DRLG P OBD, CWT =2K, WOB=.9K, BHP= 11,902.0 11,915.0 09:24 09:48 4516 psi, WHP = 636 psi, circ = 5036 psi, pump 5x5 sweep, difficulty drilling, poor weight transfer 9/29/2018 9/29/2018 0.30 PROM DRILL WPRT P 500' wiper, PUW = 39K, RIW = 9K 11,915.0 11,915.0 09:48 10:06 9/29/2018 9/29/2018 1.40 PROM DRILL DRLG P OBD, 1.8 bpm, CWT= 4K (quickly 11,915.0 11,975.0 10:06 11:30 falling oft), WOB =.9K, BHP = 4525 psi, WHP = 615 psi, circ = 4974 psi, pumping multiple 10 bbl beaded hi-vis pills, drill to 11,975', PUW = 35K 9/29/2018 9/29/2018 2.70 PROM DRILL DRLG P Unsure of TVD in structure, decision 11,975.0 12,088.0 11:30 14:12 made to drill past planned TD (11,975'), CWT = -4K, WOB =.8K. BHP = 4560 psi,WHP = 523 psi, pumping 10 bbl beaded pills as required, pump 10 x 10 sweeps at called TD of 12,088' 9/29/2018 9/29/2018 2.80 PROM DRILL WPRT P Wait for sweeps to exit bit, wiper to 12,088.0 78.0 14:12 17:00 swab, PUW = 36K, tag up 9/29/2018 9/29/2018 1.70 PROM DRILL TRIP P RBIH 78.0 8,400.0 17:00 18:42 9/29/2018 9/29/2018 0.20 PROD1 DRILL DLOG P Tie into the K1 marker for a -14.5' 8,400.0 8,433.5 18:42 18:54 correction 9/29/2018 9/29/2018 0.80 PROD1 DRILL TRIP P RIH to 8650'. Park and observe BHP 8,433.5 8,651.6 18:54 19:42 build to 13.52 psi TVD 6229.76', Trap 4306 psi @ 18:56 10 min, 4356 psi, - 13.44 ppg 20 min, 4366.7 psi, 13.47 ppg 30 min, 4374.3 psi, 13.50 ppg 40 min, 4381.3 psi, 13.52 ppg RIH after 47 min, 4381.3 psi, 13.52 PPG 9/29/2018 9/29/2018 1.40 PROD1 DRILL TRIP P Continue to RIH, tag bottom Q 8,651.6 12,090.0 19:42 21:06 12090'. Targeting 13.7 9/29/2018 9/29/2018 0.40 PRODt DRILL DISP P Pump 49.5 bbls liner running pill to the 12,090.0 12,087.0 21:06 21:30 bit, 9/29/2018 9/29/2018 1.30 PROM DRILL DISP P PU 35 k lbs, POOH laying in liner 12,087.0 8,629.0 21:30 22:48 running pill, new mud W/ 2&2% tubes plus 2 ppb Alpine beads. Paint Yellow TD flag @ 10467.94' Pull through window, clean Page 18137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Ad,v,ty Code Time P-T-% Operation (ftKB) End Depth (ftKB) 9/29/2018 9/30/2018 1.20 PROM DRILL TRIP P Continue out of hole, 8,629.0 2,287.0 22:48 00:00 "`TOL running pill 8,100' Paint White window flag @ 6978.30' Continue to POOH, slow pulling speed to 35 ft/min passing Orbit valve @ 1.75 bpm, spinning the bit, up down , up passes, continue out of hole. 9/30/2018 9/30/2018 0.40 PROM DRILL TRIP P Continue out of hole. Park, S/D 2,287.0 399.0 00:00 00:24 pumps, trap pressure, WH @1895 psi, Fell to 1572 psi. 9/30/2018 9/30/2018 0.70 PROD1 DRILL TRIP P Shut Orbit valve, blead wellhead to 399.0 93.0 00:24 01:06 zero, continued out of hole, bleed down at the stack, bleed pressure at the pumps, OWFF while PJSM. 9/30/2018 9/30/2018 1.50 COMPZI DRILL PULD P Pop off, Inspect pipe, minor flat spot- 93.0 0,6- 01:06 02:36 8' back from CC, 0.168", measure 4 way as prescribed at 12' back from the connector. All 0.203". LD BHA# 15 over a closed orbit valve. Inspect and torque reel / saddle clamp bolts. Blow down and snake Out MM. 9/30/2018 9/30/2018 0.60 COMPZ1 CASING PUTS P Clear/ clean dg floor, prep liner 93.0 0.0 02:36 03:12 running equipment. PJSM 9/30/2018 9/30/2018 2.30 COMPZ1 CASING PUTS P PU iL-03 lower completion, mn #1. 0.0 1,650.0 03:12 05:30 54 joints 4.6 lb/ft slotted ST-L liner over a non-ported bull nose topped with a shorty deployment sleeve, LOA (1651.20') Had to fight the drift through joint #3. Vacuuming down stack as it fills, verifying no flow from well. Notice leak from drawworks platform, inspect, call kick while running liner drill. AAR - 32 joints in the hole - 9/30/2018 9/30/2018 0.40 COMPZ1 CASING RGRP P Sit on safety joint staged in hole. 0.0 960.0 05:30 05:54 Waiting on mechanic who's behind 7es rig move, to inspect hydraulic leak 9/30/2018 9/30/2018 1.60 COMPZ1 CASING PUTS P Crew change, continue PU liner (w/ 32 960.0 1,650.0 05:54 07:30 in the hole), clear floor 9/30/2018 9/30/2018 0.70 COMPZ1 CASING PULD P PU liner running tools, BHA#16, skid 1,650.0 1,695.0 07:30 08:12 in cart, MU to coil, tag up, set counters, equalize above orbit valve (1600 psi), open orbit valve (7th cycle) 9/30/2018 9/30/2018 2.70 COMPZ1 CASING RUNL P RIH w/ liner run #1, clean past orbit 1,695.0 12,090.0 08:12 10:54 valve, -18.1 correction to window flag, log K1 for O' correction, 39K PUW @ window, arrive at TD, PUW = 41 K, RBIH, bring up pumps, release off liner, PUW = 33K, TOL -10,439' 9/30/2018 9/30/2018 2.70 COMPZ1 CASING TRIP P POOH, pumpng across the top until 12,090.0 44.0 10:54 13:36 window (to not displace LRP), pump down coil once through the window, paint EOP flags, close orbit valve & bleed off WHP (13.6 ppg shedule gives -1600 psi WHP), open EDC 9/30/2018 9/30/2018 0.40 COMPZ1 CASING PULD P PJSM„flow-check well, good, LD BHA 44.0 0.0 13:36 14:00 #16 9/30/2018 9/30/2018 0.90 COMPZ1 CASING PUTS P PU liner (Ported BN, 16 jnts slotted 0.0 475.0 14:00 14:54 1 1 1 ner, OH anchor & billet) 9/30/2018 9/30/2018 0.80 COMPZ1 CASING PULD P PU liner running tools, BHA#17, slide 475.0 550.0 14:54 15:42 in cart, MU to coil, tag up, set counters, equalize above orbit valve, open orbit valve (cycle #8) Page 19137 Report Printed: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-x Operabon (ftKB) End Depth (WS) 9/30/2018 9/30/2018 1.50 COMPZI CASING RUNL P RIH w/ BHA#17 liner run #2, pre-load 550.0 8,535.0 1542 17:12 DS PDL, correct to window flag for a - 20.7', PUW = 32K, close EDC 9/30/2018 9/30/2018 0.80 COMPZ1 CASING RUNL P Continue to RIH, drive by Log K1 for 8,535.0 10,431.0 1712 18:00 zero correction. Set on depth, slips oriented 180 ° ROHS. "' TOL 9950' 9/30/2018 9/30/2018 2.20 COMPZI CASING TRIP P POOH 10,431.0 41.0 18:00 20:12 9/30/2018 9/30/2018 1.30 COMPZI CASING PULD P Bump up, space out, PUD, BHA# 17, 41.0 0.0 20:12 21:30 1 1 LD same. 9/30/2018 9/30/2018 0.70 PROD2 STK BOPE P Perform BOP function test. 0.0 0.0 21:30 22:12 9/30/2018 10/1/2018 1.80 PROM STK CTOP P Cut back coil to remove flat spot. Re- 0.0 0.0 22:12 00:00 install coil connector, pull test to 3.5 k Ibs `."Cut 19' of coil 10/1/2018 10/1/2018 2.00 PROD2 STK CTOP P Cut one more foot of coil, reinstall CC, 0.0 0.0 00:00 02:00 pull test to 3.5 k Ibs, Rehead, test wire, good, 61.4 / 1400 ohms, PT to 4000 psi. Bleed down. " cut 1' foot of coil. 10/1/2018 10/1/2018 1.40 PROM STK PULD P PU & PD BHA#18, Ll-04 lateral 0.0 75.0 02:00 03:24 drilling assembly, skid cart, slab on, check and replace pack offs, bump up, set counters, 10/1/2018 10/1/2018 1.70 PROD2 STK TRIP P RIH W BHA#18 75.0 8,400.0 0324 05:06 Shallow test agitator, continue to RIH. rate(bpm) Diff press(psi) 1.0 165 1.5 825 2.0 1178 10/1/2018 10/1/2018 0.20 PROM STK DLOG P Tie into the Kl marker for-20' 8,400.0 8,432.7 05:06 05:18 correction 10/1/2018 10/1/2018 1.00 PROM STK TRIP P Continue to RIH, dry tag TOB @ 9948, 8,432.7 9,947.8 05:18 06:18 PUH, bring up rate, RBIH, observe 1726 psi dp over tools @ 1.7 bpm, dp drops to expected levels (-1300 psi FS) 10/1/2018 10/1/2018 1.20 PROD2 STK KOST P Begin milling off billet, oriented 210` 9,947.8 9,948.8 06:18 07:30 ROHS, 1 fph for 1', stall getting started, PUW = 38K, stall second time getting started FS = 1169 psi @ 1.7 bpm, BHP = 4526 psi, WHP = 823 psi, WT = 15K, WOB fell off, no motorwork, contiunue w/ shedule 10/1/2018 10/1/2018 0.50 PROD2 STK KOST P 2 fph for 1', little to no WOB, CWT 9,948.8 9,949.8 07:30 08:00 stacking ( from -14.5K to 7.5K over first 1') continue with schedule 10/1/2018 10/1/2018 0.30 PROD2 STK KOST P 3 fph for 1', CWT = -5.3K, WOB 9,949.8 9,950.0 0800 0818 = .03K, contnue stacking CWT to 2.6K, CWT lets go, stall 9950.3', PUW = 38K, observiing no aluminum over shakers 10/1/2018 10/1/2018 0.90 PROW STK KOST P PUH, pump sweeps, RBIH to verify 9,950.0 9,947.6 08:18 0912 depth, FS = 1070 psi, ease in tenths to find WOB, see weight @ 9948.6', stall, PUW = 42K, continue working to get started on billet, stall @ 9947.6' Page 20/37 Report Printed: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth I Start Time End Time Dur (hr) Phase Op code Activity Code Time P -T -X Operas n (Wit) End Depth (WB) 10/1/2018 10/1/2018 2.00 PROD2 STK TRIP T Confer w/ town POOH to PU NOV 9,947.6 78.0 09:12 11:12 agitator atop same Iron Horse motor, open EDC 10/1/2018 10/1/2018 1.20 PROD2 STK PULD T PJSM, PUD BHA#18 (cross -training), 78.0 0.0 11:12 12:24 pull motor, break off bit, blow down with air, motor appears functional 10/1/2018 10/1/2018 1.10 PROD2 STK PULD T Begin PD BHA#19 L1 A4 KO/Lit 0.0 0.0 12:24 13:30 Assembly (NOV agitator, 0,5° AKO Iron Side motor, RB P104 bit), bit came out a 1-2 (1 chipped reamer cutter & 2 plugged nozzles), observe rubber plugging nozzle, decisioin made to stop PD, pull motor OOH, PUD BHA #19 Confer w/ town decision made to PU 55 hr X-Treme motor & 55 hr agitator (tools from L1-03 lateral) 10/1/2018 10/1/2018 1.50 PROD2 STK PULD T PD BHA #19 (NOV agitator, 0.5° AKO 0.0 78.0 13:30 15:00 X-Treme motor, RB P104 bit), slide in cart, MU coil, check pack -offs, tag up, set counters 10/1/2018 10/1/2018 1.80 PROD2 STK TRIP T RIH w/ BHA#19, shallow lest at 517', 78.0 8,400.0 15:00 16:48 1.8 bpm, FS = 943 psi, good vibration, raptured screens shots of transducer output, FS = 943 psi, bore = 2411 psi, circ = 4937 psi Perform multiple tests to squire agitator data via Baker transducer (Results on S: drive under photographs for 31-01), EDC closed 10/1/2018 10/1/2018 0.10 PROD2 STK DLOG T Log Kt for -20' correction 8,400.0 8,423.0 16:48 16:54 10/1/2018 10/1/2018 1.10 PROD2 STK TRIP T Continue RIH, PUW = 40K @ window, 8,423.0 9,948.4 16:54 18:00 counters not in agreement, troubleshoot, set down @ 8693', dry tag TOB at 9949.8' 10/1/2018 10/1/2018 0.90 PROD2 STK KOST P Milling off billet, 1 fph for 1'm, CWT 9,948.4 9,949.4 18:00 18:54 =15.7K, WOB on falls off 1011/2018 10/1/2018 0.50 PROD2 STK KOST P Go to 2 fph for V 9,949.4 9,950.4 18:54 19:24 10/1/2018 10/1/2018 0.30 PROD2 STK KOST P Go to 3 fph for V 9,950.4 9,951.4 19:24 19:42 10/1/2018 10/1/2018 1.00 PROD2 STK KOST P Control drill 3-10 fph until 10' in (past 9,951.4 9,961.4 19:42 20:42 slips) per DD 10/1/2018 10/1/2018 1.30 PROD2 DRILL DRLG P Off billet drilling ahead, 1.8 bpm, CWT 9,961.4 10,151.0 20:42 22:00 = 13K, WOB = 1.41K, BHP = 4613 psi, WHP = 788 psi, circ = 5502 psi 10/1/2018 10/1/2018 0.50 PROD2 DRILL WPRT P PUW = 39K, dry drift billet area up & 10,151.0 10,151.0 22:00 22:30 down, clean Capture off bottom screens of agitator frequency at 1.65 & 1.9 bpm (70 & 80 gpm) 10/1/2018 10/1/2018 1.30 PROD2 DRILL DRLG P OBD, 1.8 bpm, FS = 1000 psi, CWT= 10,151.0 10,350.0 22:30 23:48 13k, WOB = 1.3K, BHP = 4591 psi, WHIP = 758 psi, pumps sweeps, ROP = 153 fph 1011/2018 10/2/2018 0.20 PROD2 DRILL WPRT P PU 40 k Its, wiper trip number 1 10,350.0 9,750.0 23:48 00:00 10/2/2018 10/2/2018 0.10 PROD2 DRILL WPRT P Continue wiper up -hole - Wiper #1 9,750.0 9,552.0 00:00 00:06 Page 21137 ReportPrinted: 10/15120181 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hb Phase Op Code Activity Code Time P-T-X Operabon (MIKE) End Depth (itKe) 10/2/2018 10/2/2018 0.30 PROD2 DRILL WPRT P RBIH - RIHWt 14 k lbs 9,552.0 10,350.0 0006 0024 10/2/2018 10/2/2018 2.10 PROD2 DRILL DRLG P CT 5314 psi @ 1.80 bpm, Annular 10,350.0 10,750.0 00:24 02:30 4599 psi, Free spin 934 psi, WH 700 psi. IA 649 psi, OA 197 psi. OBD, CT Wt 4 k lbs, WOB 2.2 k lbs, ROP 190 fVhr 10,572 PU 40 k lbs 10,573' PU 41 k lbs 10,684 PU 47k lbs - let drill off to rotate TF, sat to log Targeting 13.7 ppg @ the window, setting 13.8 pg - pushing away 2.5 bbls per hr. Average ROP over interval - 190 Whir 10/2/2018 10/2/2018 0.20 PROD2 DRILL WPRT P PU 42 k lbs, wiper #2 10,750.0 9,975.0 0230 0242 32 k Ibs, clean pulling, good hole 10/2/2018 10/2/2018 0.20 PROD2 DRILL WPRT P RBIH - RIHWt 12 k lbs - clean 9,975.0 10,750.0 0242 0254 10/2/2018 10/2/2018 3.50 PROD2 DRILL DRLG P CT 5284 psi @ 1.79 bpm, Annular 10,750.0 11,151.0 0254 0624 4712 psi, Free spin 880 psi, WH 723 psi. OBD, CT Wt 7 k lbs, WOB 1.5 k lbs, ROP 190 f lhr 10,990 PU 42 k Ibs - PU as 5x5 exited midway to scheduled wiper Average ROP over interval - 114 ft/hr 10/2/2018 10/2/2018 0.90 PROD2 DRILL WPRT P PU 41 k lbs, wiper #3 to the window 10,750.0 8,700.0 0624 0718 for tie in 35-32 k lbs, clean pulling, good hole Billet clean 10/2/2018 10/2/2018 0.10 PROD2 DRILL DLOG P Tie into the RA tag for a +4' correction 8,700.0 8,725.0 0718 0724 10/2/2018 10/2/2018 0.80 PROD2 DRILL WPRT P RBIH 8,725.0 11,151.0 0724 0812 Billet clean 10/2/2018 10/2/2018 3.90 PROD2 DRILL DRLG P CT 5300 psi @ 1.80 bpm, Annular 11,151.0 11,430.0 08:12 12:06 4689 psi, Free spin 872 psi, WH 692 psi. OBD, CT Wt 7 k lbs, WOB 1.9 k lbs, ROP 120 ft/hr PU 11302' 38k lbs Start mud swap to system # 4 PU 11389'44 lbs, 47k, & 47k, in something hard, pulled 200' for restart, running out of push. New mud going down hole @12:07 and 11430' targeting 13.7 ppg a the window, holding 13.6 ppg, pushing away —1.5 bbl/hr Average ROP over interval - 71 ft/hr 10/2/2018 10/2/2018 0.30 PROD2 DRILL WPRT P PU 45 k lbs, early wiper # 1 - 500' 11,430.0 10,930.0 1206 1224 1 10/2/2018 10/2/2018 0.20 PROD2 DRILL WPRT P RBIH 10,930.0 11,430.0 12:24 1236 1 Pumping new mud 1 Page 22/37 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Tmre Dur(hr) Mase Op Code AcdVity Cade Time P -T -x Operation mKB) End Depth@KB) 10/2/2018 10/2/2018 3.00 PROD2 DRILL DRLG P CT 4946 psi (d1 1.79 bpm, annular 11,430.0 11,605.0 12:36 15:36 4738 psi, Free spin 894 psi, WH 751 psi. OBD, CT Wt 2 k lbs, WOB 1.8 k lbs, ROP 150 8/hr PU 11510' 40 k lbs "` New mud at the bit 11430', Strugle to drill, pump 10x10tube pill 1&1% 776 ans low torque, drilling break then fall off as sweep came out backside. Added 1% low torque to active. Good effect. targeting 13.7 ppg a the window, holding 13.6 ppg, pushing away -1.5 bbl/hr Average ROP over interval -58 fUhr 10/2/2018 10/2/2018 1.80 PROD2 DRILL DRLG P OBD, CT Wt 1 k lbs, WOB 1.7 k lbs, 11,605.0 11,745.0 15:36 17:24 ROP 150 ft/hr PU 11676' 47 k lbs targeting 13.7 ppg a the window, holding 13.6 ppg, pushing away -1.5 bbl 10/2/2018 1012/2018 2.00 PROD2 DRILL DRLG P OBD, 1.78 bpm at 5,056 FS, Diff --910 11,745.0 11,810.0 17:24 19:24 psi, WHP=810, BHP=4,725, IA=652, OA=201 10/2/2018 10/2/2018 0.30 PROD2 DRILL WPRT P Wiper up hole (1,000) 11,810.0 10,810.0 19:24 19:42 10/2/2018 10/2/2016 0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW=9.0 k 10,810.0 11,810.0 19:42 20:00 10/2/2018 10/2/2018 1.70 PROD2 DRILL DRLG P BOBD, 1.78 bpm at 5,056 FS, 11,810.0 11,924.0 20:00 21:42 Diff -910, WHP=823, BHP=4,731, IA=652, OA=201 10/2/2018 10/2/2018 0.20 PROD2 DRILL WPRT P Wiper up hole (200'), struggling with 11,924.0 11,724.0 21:42 21:54 weight transfer 10/2/2018 1012/2018 0.20 PROD2 DRILL WPRT P Wiper back in hole, RIW=9.0 k 11,724.0 11,924.0 21:54 22:06 10/2/2018 10/3/2018 1.90 PROD2 DRILL DRLG P BOBD, 1.78 bpm at 5,056 FS, 11,924.0 12,027.0 22:06 00:00 Di"- 10, WHP=823, BHP=4,731, IA=652, OA=201 "` Note: Add beads to high vis pit, drill ahead pumping 10 bbl beaded sweeps. 10/3/2018 10/312018 3.00 PROD2 DRILL DRLG P OBD, 1.77 bpm at 5,169 psi FS, 12,027.0 12,130.0 00:00 03:00 Diff --875 psi, WHP=730, BHP=4,759, IA=656, OA=205 `** Note: Pumping 10x10 beaded sweeps 10/3/2018 1013/2018 3.30 PROD2 DRILL WPRT P TD lateral, PUW 40.0 k, pump wiper to 12,130.0 50.0 03:00 1 06:18 I I I I I the window chasing 10x10 sweep 1013/2018 10/3/2018 1.50 PROD DRILL TRIP P Bump up, set counters, RBIH. 50.0 8,400.0 06:18 07:48 10/3/2018 10/3/2018 0.30 PROD2 DRILL DLOG P Tie ino to K1 for a -21' conection. 8,400.0 8,426.2 07:48 08:06 I Page 23137 ReportPrinted: 10/15/2018 operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Dep Start Time End Time our (hr) Phase op Code Activdy Code Time P -T -X Operation (ftKB) End Depth(ftKB) 10/3/2018 10/3/2018 0.40 PROD2 DRILL TRIP P PU 36 k lbs, RIH and park at 8670' 8,426.2 8,670.0 08:06 08:30 CTMD, 6243.42 TVD, measure bottom hole pressure. Trap 4430.7 psi, observe pressure bleed to 4424.1 - 13.65 to 13.62 ppg EMW Open choke and bleed annular to 4365.3 psi - 13.45 ppg EWM time(min) press (psi) EMW (ppg) 5 4414 13.6 10 4415 13.6 15 4419 13.6 10/3/2018 10/3/2018 1.50 PROD2 DRILL TRIP P Continue to RIH, Window and billet 8,670.0 12,133.0 0830 10:00 both clean CT Wt 17k @ 50 ft/min, weight fell off below 11,400'reduoed RIH speed Send liner running pill Reduced RIH speed to 16 f lmin and utalized beaded Inerr running pill to reach bottom. 10/3/2018 10/3/2018 3.20 PROD2 DRILL TRIP P Pu 38 k lbs, POOH painting flags and 12,133.0 62.0 10:00 13:12 laying in liner running pilll. Yellow TD flag - 10863.53' White window flag 7278.29' '"" top of liner running pill 7900' Park @ 3492', Gose Orbit valve, bleed down. Continue out of hole 10/3/2018 10/3/2018 1.30 PROD2 DRILL PULD P Flow check while holding PJSM. 62.0 0.0 13:12 14:30 Inspect pipe, Found gouges in pipe from gripper block, appears to be from bump up @ 6:16 am 10/3/18. Measured pipe at 12' back from coil connecter, 0.210" DS, 0.210 DS, 0.199 reel side, 0.219 Wall side. LD BHA#20 over a closed orbit valve. 10/3/2018 10/3/2018 0.30 COMPZ2 CASING PUTB P Clean and prep floor to run liner 0.0 0.0 14:30 14:48 10/3/2018 10/3/2018 0.50 COMPZ2 CASING PUTB P PU/MU L1-04 completion, run #1, 42 0.0 510.0 14:48 15:18 joints 2-3/8" STL 4.6#/ft slotted liner over a no -ported bull nose and under a shorty deployment sleeve. 10/3/2018 10/3/2018 1.00 COMPZ2 CASING PUTB P @ 17 joints away. Alerted to diesel 510.0 510.0 15:18 16:18 spill at front of rig. Picked up safety joint then floor crew responded to the diesel spill. 10/3/2018 10/3/2018 1.20 COMPZ2 CASING PUTB P continue to PU/MU L1-04 completion, 510.0 1,297.0 16:18 17:30 run #1, 42 joints 2-3/8" STL 4.6#/ft slotted liner over a no -ported bull nose and under a shorty deployment sleeve. 10/3/2018 10/3/2018 1.00 COMPZ2 CASING PULD P PU BHA 1,297.0 1,343.0 17:30 18:30 10/3/2018 10/312018 0.50 COMPZ2 CASING PULD P Check pac-offs (good), change out 1,343.0 1,343.0 18:30 19:00 UOC float valves 10/3/2018 10/3/2018 1.50 COMPZ2 CASING RUNL P RIH with AL -04 first liner segment 1,343.0 8,543.0 19:00 20:30 10/3/2018 10/3/2018 0.15 COMPZ2 CASING RUNL P Correct to the EDP flag correction of 8,543.0 8,543.0 20:30 20:39 Minus 25.12' 1013/2018 10/3/2018 0.50 COMPZ2 CASING RUNL P Continue RIH 8,543.0 9,675.0 20:39 21:09 10/3/2018 101312018 0.20 COMPZ2 CASING RUNL P Log the Kt correction plus 4.5', PUW 9,675.0 9,675.0 21:09 2121 41 k Page 24137 Report Printed: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log De Start Depth Start Time End Time Dur (hr) Phase Op Coda nciiNy Code Time P -T -X Operelron (rt End Depth (WB) 10/3/2018 10/3/2018 0.60 COMM CASING RUNL P Continue IH 9,675.0 12,133.0 21:21 21:57 10/3/2018 10/3/2018 0.30 COMM CASING RUNL P Set down 3.0 k, bring pump online, 12,133.0 10,822.6 21:57 22:15 1.25 bpm in and 1.25 bpm out, (592 psi/diff), PUW 36 k, remove liner length from counters, •** Note: Pushed away 6 bbls on trip in the hole. 10/3/2018 10/4/2018 1.75 COMPZ2 CASING TRIP P Lined up across the top, PUH to 10,822.6 4,232.0 22:15 00:00 7,900'. line back up down the coil, continue POOH 10/4/2018 10/4/2018 0.75 COMPZ2 CASING TRIP P Continue POOH 4,232.0 44.2 00:00 00:45 1014/2018 10/4/2018 0.20 COMPZ2 CASING TRIP P Function closed Orbit valve (1,600 psi 44.2 44.2 00:45 00:57 below) 1014/2018 10/4/2018 0.25 COMPZ2 CASING OWFF P Check well for flow (no -flow) 44.2 44.2 00:57 01:12 10/4/2018 1014/2018 0.30 COMM CASING PULD T LD setting tools, found liner at surface. 44.2 0.0 01:12 01:30 10/412018 10/412018 0.20 COMPZ2 CASING PULD T Stand back CoilTrak tools, Break off 0.0 0.0 01:30 01:42 and inspect GS (good) 10/4/2018 10/412018 0.25 COMPZ2 CASING PULD T MU setting tools 0.0 1,343.0 01:42 01:57 10/4/2018 10/412018 1.50 COMPZ2 CASING RUNL T RIH, with lower liner segment take#2 1,343.0 8,542.0 01:57 03:27 10/4/2018 10/4/2018 0.15 COMM CASING RUNL T Correct to the EOP flag (minus 24.8'), 8,542.0 8,542.0 03:27 03:36 PUW 40 k 10/4/2018 10/4/2018 0.38 COMM CASING RUNL T Continue IH 8,542.0 9,672.0 03:36 03:58 10/4/2018 10/4/2018 0.15 COMPZ2 CASING RUNL T Log the K1 marker correction (plus 9,672.0 9,707.0 03:58 04:07 4.0') 101412018 10/412018 0.75 COMPZ2 CASING RUNL T Continue IH 9,707.0 12,133.0 04:07 04:52 10/4/2018 1014/2018 0.20 COMPZ2 CASING RUNL T Set down 3.7 k DHWOB, PUW 41 k, 12,133.0 10,810.0 04:52 05:04 set back down 3.78 k DOWOB, bring pump online, 1.39 bpm (891 psi/diff), PUW 35 k, minus 1.0 k, remove liner length from counters, "' Note: Pushed away 6 bbls on trip in the hole. 10/4/2018 10/4/2018 2.30 COMPZ2 CASING TRIP P POOH, @ surface, 15134 psi WH 10,810.0 52.0 05:04 07:22 prior to closing the orbit valve star of 10th cycle, PJSM. 10/412018 10/4/2018 0.40 COMPZ2 CASING PULD P Flow check, unstab injector, LD BHA # 52.0 0.0 07:22 07:46 21 10/4/2018 101412018 0.30 COMPZ2 CASING PUTB P Clear floor and prep for runing liner 0.0 0.0 07:46 08:04 10/4/2018 101412018 2.00 COMM CASING PUTS P Pick up upper Ll -03 completion 0.0 1,500.3 08:04 10:04 ( run#2), 48 joints under an alminum liner top billet, LOA 1500.25'. 10/4/2018 10/4/2018 0.50 COMM CASING PULD P PU BA#22, stab on, bump up and set 1,500.3 1,52W-5- 10:04 10:34 countersequalize to 1673 psi, Open Orbit valve, Cycle #10, 10/4/2018 10/4/2018 1.00 COMM CASING RUNL P RIH 1,544.5 7,775.0 10:34 11:34 10/412018 10/4/2018 0.20 COMPZ2 CASING DLOG P Large tie in at window flag, -57.5'. 7,775.0 7,775.0 11:34 11:46 Inspect counters, clean, arbitrarily correct to -20' as per typical and roll in hole. Page 25137 ReportPrinted: 10115/2018 Operations Summary (with Timelog Depths) 31-01 it -in Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Time End Time Dur (hr) Phase Op Coda Activity Code Time PJA Operation (1(e) End Depth (fixe) 10/4/2018 10/4/2018 0.60 COMPZ2 CASING RUNL P Continue to RIH. 7,775.0 9,885.0 1146 12:22 PU Wt 36 k @ 8640' 10/4/2018 10/4/2018 0.10 COMM CASING DLOG P Tie into K1 for 0' correction. 9,885.0 9,910.0 12:22 12:28 10/4/2018 10/4/2018 0.40 COMM CASING RUNL P Continue to RIH, tag up, 10834, SID 9,910.0 10,834.0 12:28 12:52 3.6 k lbs, PU 43 k lbs, - 6.8 k Ib WOB, RBIH, S/D 3.8 k lbs, Onlne w pump, 1.63 bpm, 901 psi,diff, PU 34 k lbs R - 1.54 k Has WOB """Set liner on depth TOB @ 9334', reset counters. 10/4/2018 10/4/2018 1.90 COMM CASING TRIP P POOH, park @ 500', open EDC. 10,834.0 23.7 12:52 14:46 Continue to POOH. 10/4/2018 10/4/2018 1.00 COMP72 CASING TRIP P At surface, bump up, spasm out, WH 23.7 0.0 14:46 15:46 1590 psi, A 622 psi, OA 186 psi. PUD BHA#22. 10/4/2018 1014/2018 1.22 PRODS STK CTOP P Pipe management, Open hot work 0.0 0.0 15:46 17:00 permit, remove upper quick, boot wire, install noule, pump slack back, un slab, rig up hydraulic cutter, 10/4/2018 10/4/2018 2.00 PROD3 STK CTOP P Trim coil finding wire @ 18', continue 0.0 0.0 17:00 19:00 trimming coil 500' 13,240' Coil Length...... 10/412018 10/4/2018 0.30 PROD3 STK CTOP P Install CTC, pull test 35 k 0.0 0.0 19:00 19:18 10/4/2018 10/4/2018 0.50 PRODS STK CTOP P Re -head BHI upper quick, 0.0 0.0 19:18 19:48 >2000/58mohms, PT 4,000 psi (good - test) 10/4/2018 10/4/2018 0.50 PRODS STK CTOP P Stab INJH, pump slack forward 0.0 0.0 19:48 20:18 10/4/2018 10/4/2018 1.00 PROD3 STK PULD P Break off INJH, PU/PD kickoff/drilling 0.0 78.3 20:18 21:18 BHA#23 10/4/2018 10/4/2018 0.40 PROD3 STK PULD P Surface test Coiltrak tools (good -test). 78.3 78.3 21:18 21:42 lag up reset counters, bring WHP upto 1,700 psi, function open the orbit valve. 1014/2018 10/4/2018 1.75 PRODS STK TRIP P RIH 78.3 8,400.0 21:42 23:27 10/4/2018 10/4/2018 0.20 PRODS STK DLOG P Log the K1 correction minus 20.5' 8,400.0 8,442.0 23:27 23:39 10/4/2018 10/5/2018 0.35 PROD3 STK TRIP P Continue IH 8,442.0 9,311.0 23:39 00:00 10/5/2018 10/5/2018 0.10 PROD3 STK TRIP P Continue IH, shut down pump, dry tag 9,311.0 9,330.0 00:00 00:06 TOB @ 9,330', PUW 36 k 1015/2018 10/5/2018 0.15 PRODS STK TRIP P PUH, bring pump online, obtain 9,330.0 9,328.4 00:06 00:15 parameters, 1.78 bpm at5,442 psi FS, Diff -1,412, WHP=770, BHP=4,619 1015/2018 10/5/2018 0.75 PROW STK KOST P Kick off billet as per RP @ 1 fph 9,328.4 9,329.4 00:15 01:00 10/5/2018 10/5/2018 0.50 PRODS STK KOST P Increase ROP to 2 fph 9,329.4 9,330.1 01:00 01:30 10/5/2018 10/5/2018 0.50 PROD3 STK KOST P Increase ROP to 3 fph 9,330.1 9,331.0 01:30 02:00 10/512018 1015/2018 0.35 PRODS STK KOST P Increase 7-10 fph targeting 1.0 k 9,331.0 9,339.0 02:00 02:21 DHWOB 101512018 1015/2018 1.00 PRODS DRILL DRLG P Drill ahead, 1.80 bpm at 5,816 psi, 9,339.0 9,491.0 02:21 03:21 WHP=434, BHP=4,572, IA=639, OA=190 10/5/2018 10/5/2018 0.15 PRODS DRILL WPRT P PUH for dry drift KOP, slight bobble 9.491.0 9,300.0 03:21 03:30 (200 lbs) Page 26137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time our (M) Phase Op Code Activity Code Time P -T -X Operation Me) End DepM (ml(e) 10/5/2018 10/5/2018 0.15 PRODS DRILL WPRT P RBIH, past KOP (clean) 9,300.0 9,458.0 03:30 03:39 10/5/2018 10/512018 0.15 PRODS DRILL WPRT P Perform Check shot @ 9,458' 9,458.0 9,458.0 03:39 03:48 10/5/2018 10/5/2018 0.15 PRODS DRILL WPRT P Continue IH, Perform check shot 9,458.0 9,488.0 03:48 03:57 1015/2018 10/5/2018 1.60 PRODS DRILL DRLG P BOBO, 1.80 bpm at 5,454 psi FS, 9,488.0 9,735.0 03:57 05:33 Diff -1399, WHP=623, BHP=4,600, IA=640, OA=192, pump 5X5 sweep, timed out with pending wiper. 10/5/2018 101512018 0.20 PRODS DRILL WPRT P PU Wt 38 k lbs, wiper #1 - 400' 9,735.0 9,364.0 05:33 05:45 10/5/2018 10/5/2018 0.20 PRODS DRILL WPRT P RBIH from wiper#1 9,364.0 9,735.0 05:45 05:57 10/5/2018 10/5/2018 1.00 PRODS DRILL DRLG P CT 5302 psi @ 1.81 bpm, Annular 9,735.0 9,859.0 05:57 06:57 4563 psi,Free spin dif 1331 psi, WH 631, IA 644, OA 195 BOBO, CT Wt 10 k lbs, WOB 2.8 k lbs, ROP 130 ft/hr Average ROP over interval 124 ft/hr 10/5/2018 10/5/2018 0.50 PRODS DRILL WPRT P PU 41k lbs, WOB fell off, noticed 9,859.0 9,859.0 06:57 07:27 baker screen had locked up. Continued to PU while troubleshooting. rectified, RBIH 10/5/2018 10/5/2018 1.20 PRODS DRILL DRLG P CT 5420 psi @ 1.81 bpm, Annular 9,859.0 10,155.0 07:27 08:39 4565 psi,Free spin dif 1412 psi, BOBO, CT Wt 11 k lbs, WOB 1.8 k Ibis, ROP 200 ft/hr Average ROP over interval 247 fl/hr 10/5/2018 10/5/2018 0.30 PRODS DRILL WPRT P PU Wt 36 lbs - Wiper #2 - 800' 10,155.0 9,373.0 08:39 08:57 " Note have beads in our high vis sweep left over from liner running pill 10/5/2018 10/5/2018 0.30 PRODS DRILL WPRT P RBIH - RIH Wt 14 k Itis 9,373.0 10,155.0 08:57 09:15 10/512018 1015/2018 2.70 PRODS DRILL DRLG P CT 5458 psi @ 1.81 bpm, annular 10,155.0 10,550.0 09:15 11:57 4633 psi,Free spin dif 1447 psi, WH 683 psi BOBD, CT Wt 7 k lbs, WOB 2.2 k lbs, ROP 100 ft/hr 10,299 PU Wt 37 k Ibis - free spin 1,471 psi 10,350 PU Wt 40 k lbs - free spin 1,398 psi Time out 54 sweep for wiper Average ROP over interval 146 ft/hr 10/5/2018 1015/2018 0.70 PRODS DRILL WPRT P PU Wt 38 lbs - Wiper #3 -to window 10,550.0 8,685.0 11:57 12:39 for tie in Billet clean Inadvertently came up through the window and back down through it with pumps on, neg and pos WOB spikes, motor did not torque up though. 10/5/2018 10/5/2018 0.20 PROD3 DRILL DLOG P Tie into RA tag for a +4' correction 8,685.0 8,729.6 12:39 12:51 10/5/2018 10/5/2018 0.60 PRODS DRILL TRIP P RBIH, billet clean 8,729.6 10,550.0 12:51 13:27 Page 27137 Report Printed: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Siert Time End Tme our (hr) Phase OP Code A by Coo Time P-T-x Openruon (ftKB) End DBPih (ftKB) 10/5/2018 10/5/2018 3.50 PRODS DRILL DRLG P CT 5378 psi @ 1.79 bpm, annular 10,550.0 10,882.0 13:27 16:57 4628 psi,Free spin dif 1312 psi, WH 636 psi BOBD, CT Wt 5.4 k lbs, WOB 1.36 k lbs, ROP 212 ft/hr 10,632' PU Wt 41 Is Ibs - free spin 1,373 psi 10,652' PU Wt 39 k lbs - free spin - Starting to run out of push- pull 100' BHAwiper. 10,785' PU Wt 42 k lbs 10881' pu 54 and 42 k lbs, found something hard. tried to dime out 5x5 sweep for wiper, pick up slow till sweep out Average ROP over interval 95 ft/hr 10/5/2018 10/5/2018 0.40 PROD3 DRILL WPRT P PU Wt 40 los - Wiper #1 - 1000' 10,882.0 9,882.0 1657 1721 10/5/2018 10/5/2018 0.40 PROD3 DRILL WPRT P RBIH 9,882.0 10,882.0 17:21 17:45 10/5/2018 10/5/2018 1.25 PROD3 DRILL DRLG P BOBD, 1.78 bpm at 5,470 psi, Diff- 10,882.0 11,023.0 17:45 19:00 1,230 psi, WHP=722, BHP= 4,639, IA=654, OA=206 — Note: New Mud at the bit @ 10,927' 10/5/2018 10/5/2018 1.60 PROD3 DRILL DRLG P PUH, obtain new drilling parameters 11,023.0 11,287.0 19:00 20:36 with new mud, OBD, 1.81 bpm at 5,062 psi, Diff--1,286 psi, WHP=914, BHP=4,642, IA=651, OA=203, 101512018 1015/2018 0.30 PRODS DRILL WPRT P Wiper up hole (1,000'), PUW 43 k 11,287.0 10,287.0 20:36 20:54 101512018 1015/2018 0.30 PRODS DRILL WPRT P Wiper back in hole, RIW 11 k 10,287.0 11,287.0 20:54 21:12 10/512018 10/512018 1.40 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,053 psi, 11,287.0 11,437.0 21:12 22:36 Diff=1,290 psi, WHP=927, BHP=4,665, IA=651, OA=208 10/52018 10/5/2018 0.15 PROD3 DRILL WPRT P PUH, PUW 41 k, short wiper up hole, 11,437.0 1,193.0 22:36 22:45 10/5/2018 10/52018 0.15 PROD3 DRILL WPRT P Wiper back in hole RIW 11 k 1,193.0 11,437.0 22:45 22:54 10/5/2018 1015/2018 0.60 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,053 psi, 11,437.0 11,518.0 22:54 23:30 Diff=1,290 psi, WHP=927, BHP=4,665, IA=651, OA=208 10/5/2018 1015/2018 0.30 PROD3 DRILL WPRT P Incounter hard spot, work to get driling 11,518.0 11,518.0 23:30 23:48 ahead, PUW 35 k "' Note: Sample indicated Ankerite 10/512018 10/6/2018 0.21 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,053 psi, 11,518.0 11,522.0 23:48 00:00 Diff=1,290 psi, WHP=927, BHP=4,665, IA=651, OA=208 10/6/2018 10/6/2018 1.00 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,153 psi, 11,522.0 11,563.0 00:00 01:00 Diff=1,290 psi, WHP=927, BHP=4,665, IA=656, OA=206 10/6/2018 10/62018 1.25 PROD3 DRILL DRLG P Incountered hard spot, PUW 33 k, drill 11,563.0 11,568.0 01:00 02:15 ahead slowly, BOBD, 1.80 bpm at 5,053 psi, Diff-1,290 psi, WHP=927, BHP=4,665, IA=656, OA=206 10/6/2018 10/6/2018 0.60 PRODS DRILL DRLG P Drill ahead, BOBD, 1.80 bpm at 5,335 11,568.0 11,619.0 02:15 02:51 1 I I psi, Diff-1,280 psi, WHP=927, BHP=4,665, IA=656, OA=206 10/612018 10/6/2018 1.25 PRODS DRILL WPRT P Wiper up to the window, PUW 37 k 11,619.0 8,700.0 02:51 04:06 1 1 I I Page 28137 Report Printed: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Steri Depm Start rime End Time Dw (hr) Phase Op cadre Actively Code Time P -T -X Operadon Mai End DePth (aKB) 10/612018 10/6/2018 0.20 PRODS DRILL DLOG P Log the RA marker correction of plus 8,700.0 8,720.0 04:06 04:18 4.0' 10/6/2018 10/6/2018 0.70 PRODS DRILL WPRT P Continue wiper back in hole, RIW 11 k 8,720.0 11,619.0 04:18 05:00 10/6/2018 10/6/2018 1.60 PRODS DRILL DRLG P BOBD, 1.80 bpm at 5,194 psi, 11,619.0 11,629.0 05:00 06:36 Diff --1,238 psi, WHP=794, BHP=4,694, IA=655, OA=207 Drilling hard spot. Average ROP 6 fl/hr 10/6/2018 10/6/2018 0.50 PRODS DRILL DRLG P Drilling breakll,629' - ROP up to 200 11,629.0 11,685.0 06:36 07:06 fl/hr IA 659 psi, OA,209 psi OBD, CT 5487 psi, @ 1.80 bpm, annular 4728 psi, WH 850 psi CT WT 0 k lbs, WOB 2.1 k lbs, Average ROP 112 Nhr 10/6/2018 10/6/2018 0.20 PRODS DRILL WPRT P PU Wt 38 k, PUH past hard spot, neg 11,685.0 11,685.0 07:06 07:18 WO spikes @ 11627', Saw positive WOB spikes when trying to RBIH @ same depth. Trouble RIH, reduce rate, etc. Pump 5x5 w 1 % each 776llowtorque ""' Trouble area - 11,627 10/6/2018 10/6/2018 2.30 PRODS DRILL DRLG P CT 5273 psi @ 1.75 bpm, Free spin 11,685.0 11,852.0 07:18 09:36 diff 1195 psi, annular 4749 psi, WH 847 psi OBD, CT WT -1 k lbs, WOB 1.8 k lbs, ROP 90 ft/ hr Average ROP 72 ft/hr 10/6/2018 10/6/2018 0.20 PROD3 DRILL WPRT P PU Wt 42 k, 200' wiper 11,852.0 11,852.0 09:36 09:48 1016/2018 10/6/2018 5.50 PROD3 DRILL DRLG P CT 5332 psi @ 1.79 bpm, Free spin 11,852.0 12,065.0 09:48 15:18 diff 1262 psi, annular 4768 psi, WH 767 psi OBD, CT WT 4 k lbs, WOB 1.6 k lbs, ROP 90-20 N hr many pick ups, 44 48 k lbs, pumpng 5x5 tube sweeps as needed TD, let mill off from 4 k CT Wt to neutral. Average ROP 38 ft/hr TD @ 12,065 10/6/2018 10/6/2018 0.80 PRODS DRILL WPRT P PU Wt 48 k, Pull up hole to 11,627'to 12,065.0 12,034.0 15:18 16:06 clean up trouble area. Sligt neg WOB then ran back through it at full rate and 57min. Pump 10 x 10 TD sweeps RBIH 10/6/2018 10/6/2018 1.20 PRODS DRILL WPRT P PU WT 38 k lbs wiper to window. 12,034.0 8,701.0 16:06 17:18 10/6/2018 10/6/2016 0.20 PROD3 DRILL WPRT P Tie into the RA tag for a+3.5 8,701.0 8,721.0 17:18 17:30 1 1 1 correction 10/6/2018 10/6/2018 1.20 PRODS DRILL WPRT P RBIH to confirm depth 8,721.0 12,066.0 17:30 18:42 101612018 10/6/2018 1.30 PRODS DRILL WPRT P POOH, laying in beaded drilling fluid 12,066.0 8,700.0 18:42 20:00 10/6/2018 1016/2018 1.00 PRODS DRILL TRIP P Continue POOH, increase pump rate 8,700.0 3,000.0 20:00 21:00 1.8 bpm at 5,370 psi, IA=642, OA=207 10/6/2018 10/6/2018 0.75 PROD3 DRILL TRIP P Perform jog IH, jet across orbit valve, 3,000.0 3,600.0 21:00 21:45 continue POOH 10/6/2018 10/6/2018 0.75 PRODS DRILL TRIP P Check well for flow, PJSM, LD drilling 78.2 0.0 21:45 22:30 assembly over a dead well. Page 29137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(m) Phase Dp Code Activity Code Time P -T -X Operation (ftKe) EM Depth(flKa) 10/6/2018 10/6/2018 0.80 COMPZ3 CASING PUTS P Prep RF for liner OPS. 0.0 0.0 22:30 23:18 10/6/2018 10/7/2018 0.70 COMPZ3 CASING PUTB P PJSM, pick up liner segment #1 w/ 66 0.0 407.9 23:18 00:00 jts of slotted liner 10/7/2018 10/7/2018 2.00 COMPZ3 CASING PUTB P Continue picking up Lt -05 completion 407.9 2,036.3 00:00 02:00 liner segement #1, Jt #13 10/7/2018 10/7/2018 0.50 COMPZ3 CASING PUTB P Clear RF of liner running equipment, 2,036.3 2,036.3 02:00 02:30 1 1 1 PJSM 10/7/2018 10/7/2018 1.20 COMPZ3 CASING PULD P PU/MU Coiltak tools, surface test 2,036.3 2,081.8 02:30 03:42 (good -lest), check pac-offs (good), switched out BHI check UQC 10/7/2018 10!7/2018 2.10 COMPZ3 CASING RUNL P Tag up reset counters, RIH, pumping 2,081.8 10,412.0 03:42 05:48 min rate, PU Wt 41 k @ 8581' 10!7/2018 1017/2018 0.20 COMM CASING DLOG P Tie into the K1 for a +2' correction. 10,412.0 10,441.0 05:48 06:00 1077/2018 10/7/2018 0.60 COMPZ3 CASING RUNL P Coninue to RIH, SID @ 12,066'. PU 10,412.0 12,066.0 06:00 06:36 WT 50 k -5.4 k WOB. RBIH, SID 3.4 k WOB, Bring rate to 1.64 bpm, diff 981 psi, PU Wt 37k WOB -1.40 k lbs, liner released, down on the pump. 10/7/2018 10/7/2018 0.10 COMPZ3 CASING TRIP P PUH, park, reset counters to acount 12,066.0 10,016.3 06:36 06:42 for dropped off liner 10/7/2018 10/7/2018 2.40 COMPZ3 CASING TRIP P POOH, park near surface, open EDC, 10,016.3 50.0 06:42 09:06 continue out of hole. 10/7/2018 10/7/2018 1.00 COMPZ3 CASING PULD P Close Orbit valve, trap 1733 psi WH 50.0 0.0 09:06 10:06 that bled to 1526 psi in 20 min. LD BHA# 26. 10/7/2018 10/7/2018 0.40 COMPZ3 CASING PUTS P Clear and prep floor to run liner. 0.0 0.0 10:06 10:30 10/7/2018 10/7/2016 1.30 COMPZ3 CASING PUTB P PU L1-05 upper completion ( run #2 ). 0.0 854.0 10:30 11:48 27 joints 2-3/8" 4.6 Ib/ft ST -L slotted liner under an anchored liner top billet with a ported bull nose. (LOA 854.76') 10/7/2018 10/7/2018 1.70 COMPZ3 CASING PUTB P PJSM, PU BHA, check pack off, good, 854.0 916.0 11:48 13:30 stab injector, tool test good, bump up, set counters. 10/7/2018 1017/2018 3.20 COMPZ3 CASING RUNL P RIH, tie into whie window flag for- 916.0 10,024.0 13:30 16:42 19.5' correction. Pumps off, close EDC, PU WT 40k lbs. continue to RIH. Tag up 10,024', SID 2.9 k lbs. PU, 39k lbs. RBIH, Oriented 180' ROHS, SID 2.48k lbs, TOB @ 9,170'. Pickup to neutral weight. WH 1135 pi. Line up pump to coil. Weak point sheared @ 6200 psi. 10/7/2018 10/7/2018 1.40 COMPZ3 CASING TRIP P PU 33 k lbs, park, reset counters, 10,024.0 50.0 16:42 18:06 1 POOH 10/7/2018 10/7/2018 1.50 COMPZ3 CASING PULD P PUD BHA 10,024.0 50.0 18:06 19:36 10/7/2018 10/7/2018 0.50 COMPZ3 CASING PULD P LD settling tools 50.0 0.0 19:36 20:06 10/7/2018 10/7/2018 0.50 PROD4 DRILL CTOP P PJSM, jet BOP Stack 0.0 0.0 20:06 20:36 10/7/2018 1077/2018 0.60 PROD4 DRILL CTOP P Grease crew on location, grease well 0.0 0.0 20:36 21:12 head and swab valves, prep lest joint 10/7/2018 10/7/2016 0.80 PROD4 DRILL CTOP P Test and chart inner reel valve and 0.0 0.0 21:12 22:00 pac-off. 1077/2018 10/8/2018 2.00 PROD4 WHDBOP BOPE P Perform Bi -weekly BOP test 250 0.0 0.0 22:00 00:00 I low/2,500 annular/4,900 psi high, state wiitness waived (Brian Bixby) Page 30137 Report Printed: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depen Start Time End Tme our (Irn Phase Op Code Activity Code Time P -T -X Operation (tIKB) End Depen (WB) 10/8/2018 10/8/2018 3.00 PROD4 WHDBOP BOPE P Continue Bi -weekly BOP test 250 0.0 0.0 00:00 03:00 low/2,500 annularl4,900 psi high, state Witness waived (Brian Bixby) 10/8/2018 10/8/2018 1.50 PROD4 WHDBOP BOPE P Mechanic on location, PJSM, lock/out 0.0 0.0 03:00 04:30 equipment, suck down stack, replace B7, manual 10/8/2018 10/8/2018 1.80 PROEM WHDBOP BOPE P Fill stack, install test joint, continue 0.0 0.0 04:30 06:18 with BOP test (12-15) -8:00 hr test 10/8/2018 10/8/2018 1.00 PROD4 STK CTOP P Blow down, install checks, valve 0.0 0.0 06:18 07:18 checklist post BOP test, PJSM 10/8/2018 10/8/2018 2.40 PROD4 STK PULD P PU & PD BHA#26, 1.2° AKO baker 0.0 72.0 07:18 09:42 omotor over a BH P104 cutter bit. Hung up in stack with high bend motor, worked it free, crowned tool out in PDL, ran BHA in to no go, had to work wire to space out. Popped off PDL, spaced out - 4.5'to high. Slab back on, RBIH, continue PD, spaced out corectly. continue on, inspect pack offs, good. Stab injetor, bump up, set counters. 10/8/2018 10/8/2018 1.60 PROD4 STK TRIP P RIH 72.0 8,400.0 0942 11:18 10/8/2018 10/8/2018 0.20 PROD4 STK DLOG P Tie into the K1 for -11 'correction. 8,400.0 8,424.3 11:18 11:30 10/8/2018 10/8/2018 0.20 PROD4 STK TRIP P Continue to RIH 8,424.3 9,170.0 1130 11:42 PU Wt 38 k @ 8160' Close EDC, continue to RIH, tag TOB @ 9170' PU Wt 40 k Ibis 10/8/2018 10/8/2018 1.40 PROD4 STK KOST P Start time milling, 1ft/hr @ 9170. 9,170.0 9,170.6 11:42 13:06 Stall X3 @ 9170.6% 9170.3, & 9170.2', PU WT's 37 - 33 k lbs 10/8/2018 10/8/2018 0.60 PROD4 STK KOST P RBIH after last PU. CT Wt falling off, 9,170.6 9,170.6 13:06 13:42 WOB falling off, should have picked up an agitator w this high bend motor. Fighting a little slip stick. Activated low frequency, surface controlled, agitator. Regained WOB and vibrations. Mill ahead, aluminum at the shaker. 10/8/2018 10/8/2018 0.20 PROD4 STK KOST P WOB falling off at curent ROP, 9,170.6 9,171.1 13:42 13:54 increase to 2 ft/min ahead of schedule. targeting 100-150 lbs WOB 10/8/2018 10/8/2018 0.70 PROD4 STK KOST P Increase to 3 ft/min 9,171.7 9,173.2 13:54 14:36 targeting 100-150 lbs WOB 10/8/2018 10/8/2018 0.60 PROD4 STK KOST P Increase to 5 ft/min, WOB stedily 9,173.2 9,175.7 14:36 15:12 came up, targeting WOB - 1-1.8 k lbs by regulating ROP. 10/8/2018 10/8/2018 1.40 PROD4 DRILL DRLG P WOB fell from 1.78-360 lbs from 9,175.7 9,277.0 15:12 16:36 9174.9 to 9175.0' Drilling ahead slowly targeting greater than 1 k less than 2 k lbs WOB, Drill ahead after 9184' 10/8/2018 10/8/2018 0.20 PROD4 DRILL WPRT P PU Wt 40 k lbs, PUH 9,277.0 9,277.0 16:36 16:48 Dry drift the billet - clean RBIH 10/8/2018 10/8/2018 0.90 PROD4 DRILL DRLG P CT 4484 psi @ 1.78 bpm, free spin diff 9,277.0 9,385.0 16:48 17:42 490 psi, annular 4560 psi, WH 823 psi, IA 640 psi, OA 194 psi. BOBD, CT 11 k lbs, WOB 2.3 klbs, ROP 115 ft/hr Page 31/37 ReportPrinted: 10115120181 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Cods AnVy Code Time P-T-X Operation (ftKB) End DepN (ftKB) 10/8/2018 10/8/2018 2.40 PROD4 DRILL TRIP P TO tum earty @ 9385', PU wt 39 k lbs 9,385.0 45.0 17:42 20:06 Jog to time out 5x5 sweep PUH past billet, clean, and window, - 1.7 k lbs, WOB tug Open EDC, continue out of hole. "' Saw 10k lbs string weight over pull and -4k WOB @ 8517' locator assembly. 10/8/2018 10/8/2018 1.30 PROD4 DRILL PULD P Bump up, space out, PUD BHA #26, 45.0 0.0 20:06 21:24 10/8/2018 10/8/2018 1.30 PROD4 DRILL PULD P PD BHA #27, skid cart, check pack 0.0 78.0 21:24 22:42 offs, replae with new, stab injector, bump up, set counters. 10/8/2018 10/812018 1.20 PROD4 DRILL TRIP P RIH, Shallow test the agitator. looks 78.0 8,400.0 22:42 23:54 like the agitator is showing up at - 16 Hz Rate Ann Bore Circ Diff (psi) 1.10 1832 2391 3797 544 1.52 1740 2653 4640 912 1.80 1716 2975 5401 1241 10/8/2018 10/9/2018 0.10 PROD4 DRILL TRIP P Tie into the K1 marker for a minus 8,400.0 6,050.0 23:54 00:00 20.5 correction. 10/9/2018 10/9/2018 0.45 PROD4 DRILL TRIP P Continue RIH w/ lateral drilling BHA 6,050.0 8,400.0 00:00 00:27 10/9/2018 10/9/2018 0.20 PROD4 DRILL DLOG P Log the formation, (Ki marker) 8,400.0 8,445.0 00:27 00:39 correction minus 20' 10/9/2018 10/9/2018 0.20 PROD4 DRILL TRIP P Continue IH 8,445.0 9,385.0 00:39 00:51 10/9/2018 10/9/2018 3.90 PROD4 DRILL DRLG P OBD, 1.77 bpm at 5,409 psi FS, 9,385.0 9,785.0 00:51 04:45 Diff-1,450 psi, WHP=668, BHP=4,567, IA=629, OA=187 10/9/2018 10/9/2018 0.30 PROD4 DRILL WPRT P Wiper up hole, PUW 41 k 9,785.0 9,200.0 04:45 05:03 10/9/2018 10/9/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole 9,200.0 9,785.0 05:03 05:21 10/9/2018 1019/2018 2.70 PROD4 DRILL DRLG P BOBD, 1.78 bpm at 5,301 psi FS, 9,785.0 10,175.0 05:21 08:03 Diff-1,250 psi, WHP=765, BHP=4,618, IA=644, OA=197 10/9/2018 1019/2018 0.45 PROD4 DRILL WPRT P Wiper up hole, PUW 41 k 10,175.0 9,200.0 08:03 08:30 10/9/2018 10/9/2018 0.45 PROD4 DRILL WPRT P Wiper back in hole, RIW 9,200.0 10,175.0 08:30 08:57 10/9/2018 10/9/2018 1.00 PROD4 DRILL DRLG P BOBO, 1.80 bpm at 5,300 psi FS, 10,175.0 10,320.0 08:57 09:57 Diff--1,190 psi, WHP=752, BHP=4,645, IA=646, OA=200 10/9/2018 10/9/2018 0.20 PROD4 DRILL WPRT P PUH for a BHA wiper (100') 10,320.0 10,320.0 09:57 10:09 10/9/2018 10/9/2018 1.35 PROD4 DRILL DRLG P BOBO, 1.80 bpm at 5,350 psi FS, 10,320.0 10,450.0 10:09 11:30 Diff--1,253 psi, WHP=718, BHP=4,625, IA=648, OA=202 101912018 10/9/2018 0.65 PROD4 DRILL WPRT P Wiper up to the window for a tie in. 10,450.0 8,700.0 11:30 12:09 PUW 37 k, performing jog back in hole from 9,200'-9,380' 101912018 10/9/2018 0.20 PROD DRILL DLOG P Log the RA marker for depth control 8,700.0 8,718.0 12:09 12:21 (plus 75) 10/9/2018 10/9/2018 0.65 PROD4 DRILL WPRT P Continue wiper back in hole, RIW 11 k 8,718.0 10,450.0 12:21 13:00 10/9/2018 1019/2018 4.70 PROD4 DRILL DRLG P BOBD, 1.78 bpm at 5,257 psi FS, 10,450.0 10,919.0 13:00 17:42 Diff-1,187 psi, WHP=769, BHP=4,657, IA=648, OA=202 '"' Note: New Mud at the bit 10,509', old mud slats: 2,478' DF / 0.96% DS Page 32137 ReportPrinted: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depm Start Time Ertl Time our (hr) Phe% Op Cotle Adw4 Cafe Time P -T -X Operation (flKB) Ertl Depth (flKB) 10/9/2018 10/9/2018 0.80 PROD4 DRILL WPRT P 10,919 pull 1000'wipertrip, 10,919.0 10,919.0 17:42 18:30 PUW=45K 10/912018 10/9/2018 1.30 PROD4 DRILL DRLG P 10,919', Drill, 1.82 BPM @ 5140 PSI 10,919.0 11,125.0 18:30 19:48 FS, BHP=4711 10/912018 10/9/2018 0.30 PROD4 DRILL WPRT P 11,125'. BHA+wipertrip. PUW=45K 11,125.0 11,125.0 19:48 20:06 10/9/2018 10/9/2018 1.90 PROD4 DRILL DRLG P 11125', Drill, 1.82 BPM @ 5285 PSI 11,125.0 11,270.0 20:06 22:00 FS, BHP=4705, ROP=140 FPM, Drilling break @ 11223', ROP down to 10 FPH. Hard to maintain steady slate drilling. Pump sweeps. Several pick ups. Drill improves -11,240 10/9/2018 10/9/2018 0.70 PROD4 DRILL WPRT P 11,270', 1000'wiper trip, PUW=41K 11,270.0 11,270.0 22:00 22:42 1019/2018 10/10/2018 1.30 PROD4 DRILL DRLG P 11,270', Drill, 1.8 BPM @ 5325PSI FS, 11,270.0 11,377.0 22:42 00:00 BHP=4785 10/10/2018 10/10/2018 0.10 PROD4 DRILL WPRT P BHA wiper, stacking 11,377.0 11,377.0 0000 00:06 10/10/2018 10/10/2018 1.10 PROD4 DRILL DRLG P 22,377', Drill 1.81 BPM @ 5324 PSI 11,377.0 11,442.0 0006 01:12 FS, BHP=4785 10/10/2018 10/10/2018 0.20 PROD4 DRILL WPRT P 200'wiper trip, PUW=47K 11,442.0 11,442.0 01:12 01:24 10/10/2018 10/10/2018 2.30 PROD4 DRILL DRLG P 11442', Drill, 1.81 BPM @ 5292 PSI 11,442.0 11,491.0 01:24 03:42 FS, BHP=4706, RIW=-4K, DHWOB=I.1 K, Drilling break @ 11461, ROP -20 FPHTrying to build, Multiple pick ups 10/10/2018 10/10/2018 0.30 PROD4 DRILL WPRT P Pull 400' wiper, PUW=51 K, Clean 11,491.0 11,491.0 03:42 04:00 wiper with sweeps 10/10/2018 10/10/2018 1.25 PROD4 DRILL ORLG P 11491', Drill, 1.8 BPM @ 5282 PSI FS, 11,491.0 11,542.0 04:00 05:15 BHP=4699, Wiper helped with ROP 20-40 FPH, Drilling break @ 11,503' ROP to 70-100 FPH RIW @ 0 with 1.6K DHWOB 10/10/2018 10/10/2018 1.40 PROD4 DRILL WPRT P Wiper up hole to the window for a tie 11,542.0 8,700.0 05:15 06:39 in, PUW 47 k, performing jog from 9,200'-9,350' 10/10/2018 10/10/2018 0.15 PROD4 DRILL DLOG P Log the RA marker correction of plus 8,700.0 8,718.6 06:39 06:48 8.5' 10/10/2018 10/10/2018 1.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 6 k 8,718.6 11,542.0 06:48 08:06 10/10/2018 10/10/2018 0.40 PROD4 DRILL DRLG P BOBO, 1.77 bpm at 5,278 psi FS, 11,542.0 11,576.0 08:06 08:30 Diff -1,123 psi, WHP=855, BHP=4,748. IA=656, OA=210 10/10/2018 10/10/2018 0.50 PROD4 DRILL WPRT P Wiper up hole 100' 11,576.0 11,576.0 08:30 09:00 10/10/2018 10/10/2018 2.00 PROD4 DRILL DRLG P Fighting hard spot with some weight 11,576.0 11,610.0 09:00 11:00 transfer issues, multiple pickups and manipulating pump rates, continue drilling ahead. OBD, 1.77 bpm at 5,278 psi FS, Diff -1,123 psi, WHP=855, BHP=4,748. IA=656, OA=210 10/10/2018 10/10/2018 0.25 PROD4 DRILL WPRT P Encounter 100% losses, slowly 11,610.0 11,100.0 11:00 11:15 1 1 1 healing up, Wiper up hole 500' 10110/2018 10/10/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 9 k 11,100.0 11,610.0 11:15 11:33 10/1012018 10/1012018 0.30 PROEM DRILL DRLG P BOBD, 1.77 bpm at 5,278 psi FS, 11,610.0 11,642.0 11:33 11:51 Diff -1,123 psi, WHP=855, BHP=4,748. IA=656, OA=210 10/10/2618 10/10/2018 0.50 PROD4 DRILL WPRT P Call TD L1 lateral, PUH send 10x10 11,642.0 11,642.0 11:51 12:21 sweep Page 33137 Report Printed: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log ft De Start Depth Start Time EMTima our (hr) Phase Op Code Activity GDde Time P -T -X OAeration End Depth (ftKa) 10/10/2018 10110/2018 1.25 PROD4 DRILL WPRT P Wiper up hole chasing sweeps to the 11,642.0 8,700.0 1221 13:36 window 10/10/2018 10/10/2018 0.20 PROD4 DRILL DLOG P Log the RA marker for depth control, 8,700.0 8,744.0 1336 13:48 correction of plus 3.0' 10/10/2018 10/10/2018 0.75 PROD4 DRILL WPRT P Contiue wiper back in hole, RIW 14 k 8,744.0 10,884.0 13:48 14:33 10/10/2018 10/10/2018 0.75 PROD4 DRILL WPRT P Bobble @ 10,884'-10,895', PUH 10,884.0 10,895.0 14:33 15:18 attempt to clean area w/DTF, no change, 10/102018 10/10/2018 0.30 PROD4 DRILL WPRT P Continue IH 10,895.0 11,400.0 15:18 15:36 10/10/2018 10/10/2018 3.00 PROD4 DRILL TRIP P POOH, laying in beaded liner running 11,400.0 58.0 15:36 18:36 pill up to the window. Close Orbit vale @ 200', Tag up and space out 10/10/2018 10/10/2018 1.00 PROD4 DRILL PULD P PJSM, Flow chec well, Lay down BHA 56.0 0.0 18:36 19:36 #27 Ll lateral drilling BHA. Observed gat area in CT. UT test @ .178 thinnest area we could find 10/10/2018 10/11/2018 4.40 COMPZ4 CASING PUTS P PJSM, Prep floor and M/U BHA#28 0.0 2,323.7 19:36 00:00 with non ported bullnose, 57 AS slotted 2 3/8" liner, and liner top billet. M/U to coil trek and surface test. Tag up and set depth 10/11/2018 10/11/2018 1.10 COMPZ4 CASING TRIP P Trip in hole, BHA #28 2,323.7 8,646.0 00:00 01:06 10/11/2018 10/11/2018 0.10 COMPZ4 CASING DLOG P Tie into white EOP flag for -22.7 8,646.0 8,624.0 01:06 01:12 10/11/2018 10/11/2018 2.30 COMPZ4 CASING TRIP P Continue trip in hole, Clean pass 8,624.0 11,404.0 01:12 03:30 hrough window, Initial set down @ 10025, Start working pipe with continued movement down. Unable to tie in due to hole conditions. gel to set depth @ 11404.5'. Pull out slack an pump off. Did not releaase on firtst atempt. PUW=51K, DHWOB=-10k. Work back down to set depth. Pull slack RIH to -2K DHWOB. Pump off. PUW=38 K DHWOB=-3K. 10/11/2016 10/11/2018 2.00 COMPZ4 CASING TRIP P PUH to 11387. Remove liner length 9,107.0 200.0 03:30 05:30 left in hole from counters. Trip out filling across top 10/11/2018 10/11/2018 1.20 COMPZ4 CASING PULD P At surface spaceout, PUD & LD 200.0 0.0 05:30 06:42 setting tools 10/11/2018 10/11/2018 1.20 PROD5 STK PULD P PJSM, PD build section BHA#29, stab 0.0 72.2 06:42 07:54 UQC, surface test tools (good -test), stab/MU INJH 10/112018 10/112018 1.50 PROD5 STK TRIP P Tag up, re -set counters, RIH 72.2 8,400.0 07:54 09:24 10/11/2018 10/11/2018 0.15 PROD5 STK DLOG P Log the Kt marker correction of minus 8,400.0 8,444.0 09:24 09:33 19' 10/112018 10/112018 0.45 PROD5 STK TRIP P Continue to RIH, PU Wt 38 k @ 8,444.0 9,126.0 09:33 10:00 8,160', Close EDC, continue to RIH, tag TOB @ 9,126.3' PU Wt 38 k lbs 10/11/2018 10/11/2018 2.00 PROD5 STK KOST P Start time milling, 9,126.0 9,128.4 10:00 12:00 1ft/hr @ 9,126.25' 211/hr @ 9127.25' 3 fUhr @ 9128.25' 10/11/2018 10/11/2018 0.20 PROD5 STK KOST P Increase WOB to I 9,128.4 9,132.0 12:00 12:12 Page 34/37 ReportPrinted: 10116/2018 Operations Summary (with Timelog Depths) 31-01 • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stas Depth start Time End Time our(m) Phew Op Code Activity Code Time P -T -X Operation (MB) End Depth(11KB) 10/11/2018 10/11/2018 0.20 PRODS DRILL DRLG P Drill Ahead, 1.78 bpm at 4,521 psi, 9,132.0 9,137.0 12:12 12:24 Diff --491 psi, WHP=929, BHP=4,538, IA=652, OA=208 10/11/2018 10/11/2018 0.15 PRODS DRILL DRLG P Stacking weight @ 9,132', PUH and re 9,137.0 9,137.0 12:24 12:33 -start 10/11/2018 10/11/2018 0.75 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,569 psi, Diff=521 9,137.0 9,215.0 12:33 13:18 psi, WHP=925, BHP=4,543, IA=658, OA=206 10/11/2018 10/11/2018 0.15 PRODS DRILL WPRT P PU Wt 38 k lbs, PUH 9,215.0 9,102.0 13:18 13:27 Dry drift the billet - clean RBIH 10/11/2018 10/11/2018 0.15 PRODS DRILL WPRT P RBIH to bottom, send 5x5 sweep 9,102.0 9,215.0 13:27 13:36 10/11/2018 10/11/2018 0.65 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,569 psi, Diff -521 9,215.0 9,325.0 13:36 14:15 psi, WHP=925, BHP=4,543, IA=658, OA=208 10/11/2018 10/11/2018 1.00 PRODS DRILL DRLG P 9,325', TO build section,POOH, PUW 9,325.0 5,780.0 14:15 15:15 38 k. open EDC above window, continue POOH, Function closed EDC, obtain screen shots w/no agitator, 1.0 bpm, 1.5 bpm, and 1.8 bpm. continue POOH, Avg DLS=38° 10/11/2018 10/11/2018 1.50 PRODS DRILL TRIP P Continue POOH, Slop at 500'. Obtain 5,780.0 51.0 15:15 16:45 screen shots @ 1, 1.5, and 1.8 BPM. Continue to surface 10/11/2018 10/11/2018 1.30 PRODS DRILL PULD P At surface, Tag up and space out, 51.0 0.0 16:45 18:03 PJSM PUD BHA#29 10/112018 10/11/2018 1.00 PRODS DRILL SVRG P M/U Nozzle, stab on and jet stack. 0.0 0.0 18:03 19:03 Flush stack and micro motion 10/11/2018 10/112018 1.15 PRODS DRILL PULD P PJSM, PD BHA# 30 L1-02 lateral 0.0 78.2 19:03 20:12 drilling BHA with .5° AKO motor, Make up to coil, Strip on and surface test. 10/11/2018 10/11/2018 1.60 PRODS DRILL TRIP P RIH BHA #30, test agitator @ 500' 78.2 8,400.0 20:12 21:48 with screenshots, continue in hole 10/11/2016 10/11/2018 0.20 PRODS DRILL DLOG P Log K1 for -21' correction 8,400.0 8,424.0 21:48 22:00 10/11/2018 10(112018 0.40 PRODS DRILL TRIP P Continue in well, set down @ 8693, 8,424.0 9,325.0 22:00 22:24 PUH roll pump, S/D and pass through 10/112018 10/12/2018 1.60 PRODS DRILL DRLG P Tag up and drill from 9325', 1.78 BPM 9,325.0 9,577.0 22:24 00:00 @ 5220 PSI FS, BHP=4672, RIW=10.9K, DHWOB=I.8K 10/1212018 10/12/2018 1.40 PRODS DRILL DRLG P 9577', Drill, 1.78 BPM @ 5220 PSI 9,577.0 9,750.0 00:00 01:24 FS, BHP=4611 10/12/2018 10/12/2018 0.50 PRODS DRILL WPRT P 9750', Wiper to billet -9130, 9,750.0 9,750.0 01:24 01:54 PUW=38K 10/12/2018 10/122018 1.00 PRODS DRILL DRLG P 9750', Drill, 1.78 BPM @ 5335 PSI 9,750.0 9,875.0 01:54 02:54 FS, BHP=4610, RIW=10.2K, DHWOB=1.1 K 10/122018 10/12/2018 0.10 PRODS DRILL WPRT P 9875, BHA Wiper, PUW=38K 9,875.0 9,875.0 02:54 03:00 10/12/2018 10/122018 2.00 PRODS DRILL DRLG P 9875', Drill, 1.78 BPM @ 5335 PSI 9,875.0 10,152.0 03:00 05:00 FS, BHP=4610, RIW=9.8K DHWOB=I.2K 10/122018 10/122018 0.25 PRODS DRILL WPRT P 10152', Wiper to 9350, PUW=36K 10,152.0 9,350.0 05:00 05:15 10/12/2018 10/12/2018 0.25 PRODS DRILL WPRT P Wiper back in hole, RIW 7.5 k 9,350.0 10,152.0 05:15 05:30 10/12/2018 10/12/2018 1.00 PRODS DRILL DRLG P BOBD,1.78 bpm at 5,347 psi FS, 10,152.0 10,334.0 05:30 06:30 Diff -941, BHP=4,692, IA=643, OA=208 Page 35137 ReportPrinted: 1 011 512 01 8 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth S1el Time End Tire Dur(hin Phase Op Code Activity Code Time P-T-X Opsalmn ME) End Depth (fiKB) 10/12/2018 10/12/2018 0.75 PRODS DRILL WPRT T DO wiper up hole, PUW=42 k 10,334.0 10,334.0 06:30 07:15 10/12/2018 10/12/2018 1.65 PRODS DRILL TRIP T Continue POOH, after discussing plan 10,334.0 72.2 07:15 08:54 forward decision was made to POOH for ako change. PJSM for UD 10/12/2018 10/12/2018 1.20 PRODS DRILL PULD T At surface, spaceout, PUD Lateral 72.2 0.0 08:54 10:06 Drilling BHA #30 10/12/2018 10112/2018 0.20 PRODS DRILL PULD T Change out drilling motor and agitator, 0.0 0.0 10:06 10:18 inspect bit 10/12/2018 10/1212018 0.65 PRODS DRILL PULD T PD, L1-02 lateral drilling BHA #31 0.0 78.3 10:18 10:57 10/12/2018 10/1212018 1.50 PRODS DRILL TRIP T RIH, pumping min rate @ 2,600 psi 78.3 8,400.0 10:57 12:27 10112/2018 10/1212018 0.20 PRODS DRILL DLOG T Log the K1 marker correction of minus 8,400.0 8,428.0 12:27 12:39 20', PUW 36 k 10/12/2018 10/12/2018 0.90 PRODS DRILL TRIP T Continue IH 8,428.0 10,334.0 12:39 13:33 10/1212018 10/12/2018 1.95 PRODS DRILL DRLG P OBD, 1.80 bpm at 5,190 psi FS, 10,334.0 10,537.0 13:33 15:30 Diff--992, BHP=4,658, WHP=758, IA=648, OA=204, swap mud with new mud at bit 10490 10/12/2018 10/12/2018 0.20 PRODS DRILL WPRT P New mud all around, pull short wiper 10,537.0 10,537.0 15:30 15:42 to update pressure parameters, PUW=38K 10/12/2018 10112/2018 1.50 PRODS DRILL DRLG P 10537', Drill 1.81 BPM @ 4995 PSI 10,537.0 10,733.0 15:42 17:12 FS, BHP=4657 10/12/2018 10/1212018 0.70 PRODS DRILL WPRT P 10,733 pull 1000' wiper, PUW=45K 10,733.0 10,733.0 17:12 17:54 10112/2018 10/12/2018 1.10 PRODS DRILL DRLG P 10733', Drill, 1.8 BPM @ 4933 PSI 10,733.0 10,873.0 17:54 19:00 FS, BHP=4688 10/12/2018 10/12/2018 0.30 PRODS DRILL WPRT P Stacking with poor transfer, Pull 250' 10,873.0 10,873.0 19:00 19:18 wiper, PUW=45K 10/12/2018 10/12/2018 1.60 PRODS DRILL DRLG P 10873', Drill 1.79 BPM @ 4915 PSI 10,873.0 11,098.0 19:18 20:54 FS, BHP=4667, RIW=<K, DHWOB=2K 10/12/2018 10/12/2018 0.80 PRODS DRILL WPRT P 1000' wiper, PUW=40K 11,098.0 11,098.0 20:54 21:42 10/12/2018 10/12/2018 1.10 PRODS DRILL DRLG P 11098', drill, 1.78 BPM @ 5030 PSI 11,098.0 11,270.0 21:42 22:48 FS, BHP=4710, RIW=5K, DHWOB=I.9K 10/12/2018 1011212018 0.10 PRODS DRILL WPRT P 11270'. BHA wiper, PUW=46K 11,270.0 11,270.0 22:48 22:54 10/12/2018 10/13/2018 1.10 PRODS DRILL DDRL P 11270', Drill, 1.78 BPM @ 5080 PSI 11,270.0 11,378.0 22:54 00:00 FS, BHP=4715, RIW=-1K, DHWOB=I.4K 10/13/2018 10/13/2018 0.30 PRODS DRILL DRLG P Drilling, 1.8 BPM @ 5080 PSI FS, 11,378.0 11,400.0 00:00 00:18 BHP=4750 10/13/2018 10/13/2018 1.60 PRODS DRILL WPRT P Call TD, 10 X 10 sweeps coming out, 11,400.0 8,400.0 00:18 01:54 Wiper to window. Pull into casing and circ bottoms up 10/13/2018 10/13/2018 0.10 PRODS DRILL DLOG P Log K1 for+4' correction 8,400.0 8,422.0 01:54 02:00 10/13/2018 10/13/2018 1.20 PRODS DRILL WPRT P Wiper back to bottom to confirm TD. 8,422.0 11,400.0 02:00 03:12 Hole very dean, took 800 Lb DHWOB @ 10,025. 10/13/2018 10/13/2018 0.30 PRODS DRILL WPRT P Tag TO @ 11400. PUH to get beaded 11,400.0 11,400.0 03:12 03:30 liner running pill to bit 10/13/2018 10/13/2018 2.50 PRODS DRILL TRIP P Trip out of hole pumping 50 BBI 11,400.0 80.0 03:30 06:00 beaded liner running pill, PUW=39K Page 36137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time log Start Depth Start Time End Time our (hr) Phase op Code Activity Code Time P-T-X Operation (WB) End Depm(MKB) 10/13/2018 10/13/2018 1.50 PROD5 DRILL PULD P At surface, function closed orbit valve 80.0 0.0 06:00 0730 (1,700 psi), check well for flow, LD drilling BHA on a dead well, 10/13/2018 10/13/2018 0.50 COMPZ5 CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0 07:30 08:00 10/13/2018 10/13/2018 3.50 COMPZ5 CASING PUTB P MU 69 jts of slotted liner 0.0 2,732.1 08:00 11:30 10/13/2018 10/13/2018 0.50 COMPZ5 CASING PULD P PU/MU Coiltrak tools, surface test 2,732.1 2,776.3 11:30 12:00 1 1 1 (good-test), check pac-offs 10/13/2018 10/13/2018 1.50 COMPZ5 CASING RUNL P RIH, with L1-02 slotted liner 2,776.3 8,575.8 12:00 13:30 completion 10/13/2018 10/13/2018 0.10 COMPZ5 CASING RUNL P Correct to the EOP flag minus 23.15' 8,575.8 8,578.8 13:30 13:36 10/13/2018 10/13/2018 0.50 COMPZ5 CASING RUNL P Continue IH 8,578.8 9,743.0 13:36 14:06 10/13/2018 10/13/2018 2.50 COMPZ5 CASING RUNL T Initial set down, work pipe towards 9,743.0 11,400.0 14:06 1636 bottom, PUW 42-55 k 10/13/2018 10/13/2018 0.20 COMPZ5 CASING RUNL P Bring pump up to 1.54 bpm, Diff=954 11,400.0 8,655.0 1636 1648 psi, PUW 38 k, remove liner length from counters, "` Note: TOL @ 8667.91' 10/13/2018 10/13/2018 1.80 DEMOB WELLPR DISP P Displace well to SW start tripping out 8,655.0 2,998.0 16:48 1836 10/13/2018 10/13/2018 1.00 DEMOB WELLPR CIRC P Stop and S/I orbit valve, 1710 PSI 2,998.0 2,998.0 18:36 1936 under valve, Pump 30 BBIs diesel freeze proect 10/13/2018 10/13/2018 0.40 DEMOB WELLPR TRIP P Continue out of well 2,998.0 55.0 1936 2000 10/13/2018 10/13/2018 0.70 DEMOB WELLPR PULD P At surface, PJSM lay down BHA on 55.0 0.0 2000 2042 dead well, Flow check - Good. Inspect CT for flat spots/ wear. 10/13/2018 10/13/2018 1.00 DEMOB WELLPR CTOP P Pull checks out of UOC, Stab on well. 0.0 0.0 2042 21:42 Equalize pressure above Orbit valve and stroke open, Leave 500 PSI on open side of valve. Final SITP=1852 PSI. Shut master, jet stack and rig. 10/13/2018 10/13/2018 0.60 DEMOB WELLPR CTOP P Unstab injector, Install night cap and 0.0 0.0 21:42 2218 blow down stack, rig, and TT line 10/13/2018 10/13/2018 1.20 DEMOB WHDBOP OTHR P Vac out stack, Run bore scope in BOP 0.0 0.0 22:18 2330 stack 10/13/2018 10/14/2018 0.50 DEMOB MOVE RURD P Start workin rig down checklist 0.0 0.0 23:30 00:00 10/14/2018 10/14/2018 6.00 DEMOB MOVE NUND P Work rig down checklist - Nipple down 0.0 0.0 0000 06:00 stack, RELEASE RIG 06:00 Page 37/37 ReportPrinted: 10/15/2018 ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01 L1 50-029-21514-60 Baker Hughes INTEQ Definitive Survey Report 19 October, 2018 BAER HUGHES E, m ), ConocoPhillips Company ConocoPhillipa(Alaska) Inc. SagziES a Project: Kuparuk River Unit She: Kuparuk 31 Pad Wel: 31-01 Weillooss 31-01 Del 3101 Project Kupamk River Unh, North Slope Alaska, united States Map System: US State Plane 1927 (Exact solution) System Data Gea Datum: NAD 1927(NADCON CONUS) Map Zone: Alaska Zone 04 Well 3401 Well Position .WS 0.00 usft Nothing 508,056.44usft .EAW 0.00 usft fasting: Posmon Uncertainty 0.00 usft Wellhead Welhola 31,1111 Fwd Strelmlh Ma9netlos Model Mame Sampla Date roti 16.95 BGGM2018 9112018 57,444 Deaign 31-0111 Audit Notes: Direction Version: 1.0 Phase: ACTUAL Vertical rl Section: Depth From IM) IMM" 71.91) ConocoPhillips SagziES a Definitive Survey Report Local Coordinate Referencs,'. Wall 31Ol Pitt)Pitt)Reference: 3401 ® 71A0usl (31-01) MD Reference'. 31-01 @ 71.00usft (3141) North Reference True Survey Calculation Method Minimum Curvature DatahaseEDT 14 Alaska Production m. Mean Sec Level Using Well Reference Point Using geodetic scale tactor 6,007,285.50usft Latitude: 70°25'52.059N 508,056.44usft Longitude: 149' Sly 3.597W Elevation: use Second Level: 0.00 uaft Declination Dip mom Fwd Strelmlh r) r) roti 16.95 80.93 57,444 Its On Depth: 9,146.27 sNF3 -wm Direction (shelf inch) r) 0.00 0.00 270.00 10/192018 3,16'1BPM Page 2 COMPASS 6000.14 Budd 860 `. Cor*A;hllhps ConocoPhillips Definitive Survey Report Dab Campo : ConocoPhilips(Maska) Inc. Local Co-ordbme Reference: W0113W1 Pml.= Kupamk Rivet Unit ND Reference: 3801®71.00usD(3W1) Site: Kupamk 31 Pad MO Reference: 3W1@71.00usR(3W1) Well: 3141 North Reference: True Wel6ore: 3801 Survey Calculation Method: Minimum Curvabre Design: 3801 Dab6ase: EDT 14 Alaska Production Survey Program Dab From To Survey lualtl IusR) Surnly(Welllom) Tool Name Description Sort Dab 100.00 6,600.00 3Wt(3W1) GOT -MS Schlumhergm GOT.adhol 1 11 211 0 0 1 8,680.00 0, UAI 3Wil1413 MW INC (31411143) MWD4NC ONLY MW0.1NC ONLY FILLER 925201a 6,727.13 944617 314111143 MM (314111403) MWD MWD -Standard 926 oia 9,120.00 9,201.22 31411-1 MWD-INC(3141 Li) MWD -INC ONLY MWD -INC _ONLY _FILLER lIUMOta 9,231.46 11,602.13 31411L1 MWO(31411-1) MWD MWD -Standard 10122016 Survey Map Map Vertical MD Inc Aef TVD 110D a 8803 88.80 Northing Ealot DLS Section Survey Tool Name IueD) 17 17 (uafll luanl IwDI (wDI Irtl Int 1'nprcl Ittl 9,140.27 San 685 6A@.24 6,27tM 3,658.39 422142 6010,915.62 512273." B.W -0Rt42 MWD(3) 9,12000 96.29 452 6.339." 6,269." 3,67&84 4.7M71 8,010.969.02 512]25.71 8.91 A.M71 MW INC .ONLY (4) 9,201.22 02.33 350.m 6,339.68 6.256.66 3,710.50 4,724.41 8.011.0.00.23 812,778.37 49.9) A.1 ,141 MNA-ING ONLY (4) 9.231.46 25R 310.24 6,345.42 622442 3239.36 4221.00 6,011.029.. 512.22301 38.80 yni,ml MoM(5) 9.261.66 2835 332.35 6,352.40 6361 A0 3,M7,. 4212.51 6011052.65 512.261.41 MA4 4.212.51 IAWD(5) 9,29,55 0230 Man 6.35745 628145 3,293.47 4,698.61 6,011,083.66 512,25048 30.01 4.698,61 M (5) 9,32164 SIT" 315.02 6,360.13 6389.13 3.616.69 4029.90 8,011,10606 512,731.75 39." 4,62990 MND(5) 935tW 92.61 305.51 6,36010 6,28910 3.8W.M 4,652.12 6011.126.36 512.280.99 3035 4.057,17 rMM(5) 9,384.51 9301 Man 6,350.46 620248 3.853.16 4,629.11 6011143.29 512.6..93 26.51 4,629.11 M (5) 9.414.15 9249 292.62 6.352.05 638605 3.865& 4.W2.M 6011.15562 51265402 14.32 4..2.23 ~(5) 9,44449 93M 29102 6,355.39 6284.38 3,826.. 4524.16 6011,162.04 512625.. 501 4524.18 MIND (5) 942454 9382 292.35 8,353.33 628233 3,888.28 4,516.40 6,011,178.30 512,518.19 1,65 4.5".40 MND(5) 9,.412 9450 Mn 8,351.12 8,280.12 3,89942 4,51911 6,011.189.45 512,5]1189 2.09 4,510.11 MD (5) 9.53443 9569 290.04 634641 627141 3,91051 449101 6011200.46 51254228 6,43 4,49101 MD (5) 9.56270 96.13 29039 6345.. 6224.5a 3,9,0.36 4464.60 6,011,21029 512.516" 1.29 4,464.66 MD (5) 9,59675 94.26 287.60 6,312.22 6,221.22 3,0139 443263 6,011,Mt28 512484.30 9.10 4.43263 "D(5) 963462 93.35 28354 6.640.30 626993 3,936.03 440595 6,011.228.69 512.46?.M 15." 4405.95 Sim(5) 9.65499 92.92 26305 am,64 6.257," 3,64582 4.326.34 6,011,235.03 54.428.64 264 4.37534 M (5) 9.684.19 92.52 203.29 6337,25 635.25 3951.22 4,347..20 6,011,2"52 54.383.52 9.61 434226 VIVO (5) Survey End Wb Annotation TIP KOP Interpolated Aaanulh 10/192016 3:16: 16PM Pape 3 COMPASS 5000.14 Build B5D �-. Cono4hillips ConocoPhillips Definitive Survey Report Company: ConocoPhisipa(Maeka) Inc. Local Oonaminate Reference: Weg 31-01 Project: Kupamk Riwr Unit TVD Reference: 3141@71.00usft(3141) She: Rupamk 31 Pad MD Reference: 31-01®7100usft(31-01) Well: 3141 Narth Reference: True ANIIbOm: 31-01 Sune, Deletion.. Method: Minimum Curvature Design- 31-01 Database: EDT 14 Alaska Pmductlon Survey Annotation 10"92010 3J6.r16PM Pepe 4 COMPASS 5000.14 Budd 850 Map Map Venlcal MD Inc Ari ND ND53 .NIS +E -V! Northing Easting DLS Section Survey Tool Name (9su) V) PI hien) lust) (Us") loan) (t1 IS) (°1100•) IS) 9,71435 92.61 22930 63359n 626490 3,956.85 4,318.09 6,0"246.61 51236983 329 431809 MNo(5) 9245.32 93.766 22955 63".15 626315 3,962.08 429655 6.01125181 51233028 3.37 438655 k,ND(5) 9,22524 9279 220,03 6,33253 6,26153 3S.A9 4259.07 6011,256.19 512.309. 83 600 4,25608 MND (6) 9,800.83 9125 22232 6331." 6.260.28 3,970.8 4,220]9 6,011,20830 512,22952 3.80 4,2X,29 SND (5) 9,8"83 9074 27635 633(167 8,25967 3,924.02 4,19090 6.01136311 513.250.62 300 4,198.08 MND(5) 9.65oe 9289 272.80 6,329]1 6,258.71 3.977.80 4,169.00 6,011rW7.41 5128012 8.69 -0,169.00 MWD(5) 9,09530 9212 279,01 6,32639 625139 3.982,23 4,139]3 6,01181.80 512.193.86 4.50 4.139.13 MWD (5) 9,92511 90.18 270.58 6,327]9 62838 3,91119 410956 6011276,33 512.16140 6.6T A109,88 MWD(5) 9,95445 90.05 27052 632713 6,25633 30120 408082 6011380.71 51213239 0.63 408057 MWD(5) 9,96421 91.35 280.59 6,32736 635636 3,99649 4051." 6011,265.67 512.10305 7,63 -0851% MWD(5) 10,01490 90.98 203.81 6326.74 625374 4,001.89 4021.19 6,011,29133 512.0.290 141 -0,021]8 skmo(5) 10.44.5 918 281. 6,326.04 6255,04 4.00775 3,99213 6,011,297.16 512,04384 4]0 -3.59213 AMC (5) 10.07355 NO 208.72 6325.37 6,25432 4,01347 3.963.71 6.011,302.84 51201642 4.97 -3.563.21 MND(5) 10,10835 0270 226.6 6.325.70 6,25410 4,01800 393327 6,011307.42 511 esken 17M )9339 MND (5) 10,13439 0250 27630 6,3554 8355.84 4,02144 3903" 6.01..=75 511955.15 040 1,903.41 MND (5) 10,164.51 M16 27616 632700 6255.88 4,024.88 3,073.54 6.011.314,16 511925.N 1,52 4187354 MWD(5) 10,193.89 89.17 27601 632856 6257,56 4.28.15 3.0"40 6.011312.39 51189608 420 -3.0"35 MWD(5) 10,8399 0936 2n 6.3X,08 625295 4,030.56 3.81435 6.011319.78 511.806.08 9% 41.01435 MWD(5) 10254.59 89.56 271.61 63X.21 6,25921 408185 3,753.78 6011.321.03 511035,49 539 41.783.78 WIND (5) 10,X4.. 90.03 22.01 63X30 6,15930 4032.79 375485 6,011 321.M 511imisn 176 375405 "D (5) 10,31315 W.6 27116 6325.7 6252.77 403381 3,72465 6,011,38.72 51177635 7.55 4,n485 MND(5) 10344.1, 9120 269.13 632291 625691 4,03369 3,69431 6,01138.77 51114602 732 1,69431 MWDS) 10374.94 09.8 265.57 6 3276 6,2567676 4,03253 3.653.50 6,011,32156 511115.8 959 4,68350 VRkUS) 10,403.47 8825 262.29 6 ILSS 6.257,69 4,02977 3.3508 6,011,318.79 sil,em85 1930 4.835]4 MND(5) 10.4",27 04.82 26182 6.33185 SMIL05 4,@553 3,EW12 6,011,31452 511956.45 4768 1,604.72 soon (5) 10.464.06 9392 26(L10 6,333,98 6,262.98 4.020.91 3,575." 6,011,35082 511527.19 6b6 3525.41 MD (5) 10.93.62 83.88 25998 6337.16 6226.16 4.015.59 3,546.9 6,011,304.51 511.59834 403 1,546.49 "D (5) 10,52441 8351 25735 63M.53 6.26953 4,00932 351658 6011,2.,22 51156034 5.37 4.518.58 MWD(5) 10554.13 84M 25550 634114 627214 4002.43 340285 6011,291.29 511,539.62 6.01 4.07¢5 MWD(5) 10.50399 8354 25391 63.96 625.96 3.W64 3,45931 6,011,28347 51151688 6.11 845921 MWD(5) 10.61405 83.07 251,87 6350.476 6279A6 3,985.86 3,43060 6.011274.08 51148247 6.92 443068 MWD(5) Annotation 10"92010 3J6.r16PM Pepe 4 COMPASS 5000.14 Budd 850 ConocoPhlllips ConocoPhillips Definitive Survey Report Company ConocoPhiBips(Aleska) Inc. Local Coottlinaas Rotational; mil 31-01 PrisaM: Kupamk River Unit TVD RaMranco: 31-0i®71.00.0(31-01) SIM. Kup ruk 31 Pad MD Reference: 31-01® 71.00u5R (31-01) Wen: 31-01 Nanh ReMmnce: Tree Wemom: 31-01 Survey Calculation Medical Minimum Curvature Dalen: 3141 Database: EDT 14 Alaska Production Survey Annotatton m 1X92018 3: 16tl0PM Pages COMPASS 500014 Build 850 Map Map wrifland MD Inc Aal TVD TVDSS -6043 0Efm Noted, Emitting DLS Sta lon survey Tool Name Juan) V) 19 (an) (uau) (usn) Neff) IRI (n) PMoo9 (n) 10,644D5 64.13 251.17 6,353.01 6,282.81 3,976.41 3,402.40 6,011.26618 511064.21 023 "402.40 MNA(5) 10,674,13 B60t 25162 6,356.30 6,2.25 39 3,uni 3374.00 6.01125659 511425.82 60.3 13]4.[4 AM)(5) 10,70377 8780 25166 6,350.12 620].12 3,95753 3,30.492 6.011.24624 511.392]5 4.35 -3.345.92 MWD(5) 10)33.82 80.26 261.26 6.359,29 6,200.29 3,90.98 3,31]45 6.011Y3566 511,36929 3.43 .,3127.45 NWD(5) 1076391 9UW 251.50 6359.73 6,280.73 3,939.42 3,288.92 6011Z17o7 511,340]0 6.27 -3,238.92 MJaD(5) 10,79346 88]5 260.0 6,359]7 6.28&77 3,928]4 3X101 8,011.217.37 511,31208 5.54 "R6t 01 MND(5) 10,823.0 89.48 247.23 6.359.97 630097 3.917.65 3.232.83 6.011.26025 511,20451 9.33 ",232.63 MND(5) 10,054.30 9021 247.23 6,360.05 6.28905 3.905.Y2 3,2%.62 6011184.49 511,25652 2.41 .204.62 WINE)(5) 10,88385 9055 24620 6360,60 6.200.05 3,894.27 3,177.46 6.01118281 511329.30 3.57 .t, 177.46 MID (5) 10,814.71 90.49 244.69 6359.58 6,288.58 3,81I1.46 314&39 6,011,169.97 511,201.32 6.16 -3,149.39 M1MD(5) low." 91.60 243.66 8.359.03 6,288.03 3,856.39 31M225 8,011,156.87 511174.20 4.60 -3,12225 )AND (5) 10978.67 92.92 243.03 635777 6286.77 3.654.17 3,093.60 5011,142.62 511,145.77 4.90 -3,083.80 MWD(6) 11.007.12 93.90 24244 6355.96 6,28096 3840.25 3,0%.70 6011120.67 511,118.76 375 106678 PAD (5) 11.034.23 04.09 24157 6.3$.07 6,28307 3,827.54 304208 6011115.94 511.094.88 3.27 404288 MD (5) 1106523 91.52 240,39 6,351.74 6280]4 381252 ],015,01 6011.103.90 511,007.63 4.03 3.015.81 MWD(5) 11,095.10 94.15 230.03 634949 6,278.49 3,797,31 2,99028 6,011,085.0 511,042.32 799 -2.980.28 "D(5) 11.12532 9270 23909 6,347.09 6.270.611 3,781.50 2964.55 6,011,%9.90 511,01601 594 1,964.55 MWD(5) 11,15457 82.09 240.60 6,346.46 6275.46 37%.80 2,939.20 6011 O55.t9 510991.23 5,% 3.939.23 MWD(5) 1118424 910 24232 6.34554 6274.54 3.75273 2,91323 6,011041D3 510,965.2 6.15 -2,913.23 MWD(5) 1131445 9280 244.7 6,3"Al 627341 3,73934 2.766.23 6011,02]48 510,916.34 0.63 4,%6.23 MWD(5) 11,24433 9088 245.13 6.343.9) 8.2860 3,726.54 2,859.19 8,011,014.76 510,91132 TM -2,85919 M (5) 11,P4.W 9046 240.03 6,343.20 8,2823 3,714.10 2,031.35 6.011=w 510.88349 615 2,331.35 WAD (5) 11,34.31 9031 249,06 6,343.02 628.@ 3,703.14 2,803.90 6.010,93139 510,856.10 707 -2,80398 IAM) (5) 1133385 9043 290.55 6,342% &27156 3.692.94 2,77623 6010,981ID 510,82&43 5.10 .2,776.26 MWD(5) 1136450 8132 251.85 634239 637139 3,683.07 2.7225 6,010.971.16 510.M." 5.14 -2,747.23 MWD(5) tt3940B 8985 252.60 6,34208 6271.0 3,674.10 2719.06 6,010962.16 510}71.23 6.01 -2,719.68 NFAD(5) 1142405 8923 254.94 6,34233 6,27133 3.605.78 2,690.27 6,010.A5382 510,74240 7.27 2,00.27 M (5) 8453.45 69,45 256.47 6,342.67 6271.67 3.656.53 2,661]9 60ID.946.53 510,714.01 5.23 2,Edm7m mrU (5) 11,460.45 900 2:b.94 6342.82 6,27102 3,660.@ 2,625]0 6,010,9]796 510,67&01 2.15 -2,625]0 MID (5) 11,521.55 9065 X751 6.342.62 637162 3,643.14 2595A5 6,010.931.0 510.6269 2.57 42&6.45 MND(5) 11551.23 91Y 25676 6.342.00 627100 3.636.53 2560.52 6010924.44 510.81&78 4.40 Q. ,52 D(5t Annotatton m 1X92018 3: 16tl0PM Pages COMPASS 500014 Build 850 Annotation 10/19/30183 16 Isom Pape6 COMPASS 5000148 850 ConoeoPhillips Cowc(; hllflps Definitive Survey Report Company: CooACDPhllllPs(Aleska) Inc. Logl Coordinate Refemnce: WBI131-01 Pmlad: Nupamk Roar Unit TVO Reference: 31-01®71.00usR(31-01) Silo: lW"auk 31 Pad MD Reference: 31-01 ® 71.00usR (31-01) WeR: 3141 North Reference: True Wellbore: 31-01 Survey Calculation Method Minimum Curvature DesiSn: 31-01 Database: EDT 14 Alaska Pmtludion Survey Map Map vard.1 MO Na Ab 1W 1V033 W4 apAW NOa) OLS Eatln9 Section (.1t) V) (I (uaf) (-to (uslll (-am) Survey Tool Name (•1100'1 ( RI ( nl nl 11,504.0] 9309 259.78 634060 626968 362907 25M40 6,010,81]]4 51058fi.E6 98B 2 534 40 "D (5) 11,607.13 93.16 259.30 6.339.46 6,zua.aa 3,625.69 251115 6,010.913.54 510,564.02 342 -2.51155 M (5) 11,64300. 9316 25930 6,33].54 _ 6,2E6 3,61922 247..54 6,010.90].03 510.529.02 0.00 .2,4]].54 PROMCTED 10 TO Annotation 10/19/30183 16 Isom Pape6 COMPASS 5000148 850 ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01 L1 PBI 50-029-21514-70 Baker Hughes INTEQ Definitive Survey Report 19 October. 2018 BA ER F�UGHES E company )a,' ConccoPhillips iq�GREs 4 ConocoPhillips Definitive Survey Report Co.,.,: ConoeoPhilbps (Alaska) Inc Local Coordinate Reference: Well 31-01 Pro)nm: Kupamk River Unit TVD points... 31411®71.00usR(3141) Spa: Kupmuk 31 Pad MO Rehrence: 31-01® 71.00usff (311 Well: 3141 North sceneries: True WNthoe: 3401 Survey Oalculatl.n Method: Minimum Curvature Design: 31-01 Danni EDT 14 Alaska Production Paled Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Feed solution) System Datum: Mean Sea Level Geo Datum : NAD 1927(NADCON CONUS) Usm, Mil Rekrence Paint Mop Zone: Alaska Zone 04 Usilg ge0tldic scaly: factor Wall 3"1 Well Position -Ni 0.00 unit Northing: 6,007,28550us. Latitude: 70°25'52.059N .&M 0.110 ..it Easting: 508,056.44usfi Longitude: 149' Sly 3.597W Position Uncertalmy 0.110 usp Wellhead Elevation: ..it Ground Level: 0.00 usfl Wagbore 3141LIP81 Magne0.s Mom Nntn "Whe base Disposal.. Dip Angta Faced Strength fl M (pi BGGM2010 91112018 16,95 WAS 57,444 Dealgn 31-01L1PB1 Audit Notes: Ven,um. 1.0 Phase: ACTUAL To On Depth: 8,700.00 Vertical Section'. Depth From(TWO) +WS •EM Dirsetlo. Iudl! (di fudi (^) 71.00 0.00 090 300.00 surveryprogram bete From To &INey survey (ui (-am Survs,11Y. b.re) Tool Name Description Send Dasa End Data 100.00 8,700.00 3401(31-01) GCT -MS Schlumberger OCT m.hold 111212001 8,]29.00 8,816.03 34011.11PH1 MWD -INC (31-01LiPH1) MWD-INC_ONLY MWD-INC_ONLY _FILLER 911]@010 B/172010 '. 8.848.70 9,965.22 31-01LiPB1 MWD(3WIL1PBi) MWD MWD -Standard 91 91222018 t. 107192018 3: 13: 10W Page t COMPASS 5000 M event 85D CollocoPhillipS Conocolshillips Definitive Survey Report Compaq. ConocaPbilips(Alaska) Inc. Local Coaninata Reference: Well 3bl P.Je01: Koski River Unit TVD Reactance: 3LOIC 71.00usa(3b17 a": Kup ruk 31 Pad MO Raacrerae: 31-01 ® 71.00usn (31.01) Well: 3wi North Renitence: True Wellbore: 31-01 Survey Colossion Method: Minimum Curvature Desi,'. 31-01 Database: EDT 14 Alaska Production Survey Annotation TIP KOP Interpelabod Avmuth Interpolated Avmuth Inarpolated A2imah 10/19!1018 311 Parini COMPASS 500014 Hudd 880 Map Map Vertical MD MO Aa 11130 TVOSe +Wd +PJ -W Ne(it) fasting OLS 3e(it) SYrvey ]001 Name loan) 1°i 1.h tri IYalh IYs rel (.sit) 1 z 1 lal Irtl 1°noo•1 IMI 8.70000 4302 84.27 6.301.21 623031 3,39468 443947 6010 a... 54.49160 069 -2147$ MWRINC_ONLY(2) Bine. ".00 04.19 6.322.41 625141 3.39567 4,459.9 6,010,688.64 512.511.49 028 -2,16342 M MJC_ONLY (2) 8.755.41 48.39 78.00 6.310.04 6269.64 3.399.64 441702 0,01068963 512,500.14 26.9 -2,178.00 MW4INC_ONLY (2) 8.786.00 5611 7100 6.35914 &28814 3,41am 4,591.36 6,010,696.2B 512,653.67 30.65 -2,195.16 MJvlYINC ONLY (2) 8,016.03 seat 65.03 6,37307 6,302.07 3.416.26 4,52597 6,010,705.31 512,67&27 33.37 -221147 M INC_ONLY(2) 0,84616 7652 Se" 6,30270 6.311)0 3,429.01 4,551.73 6,010]1988 5126..01 35.10 387.01 MOND (3) 667573 69.32 51,42 6,30534 6.31531 3.4..67 4,576.33 6.01D,734.66 512.628.59 44.39 -224094 &AND(3) &905.77 9782 52M 6,384.47 631347 3,461." 4,600.93 6,010.751.76 512,653.17 35.34 -2,25370 MWD(3) ali 85.70 31 6.38067 6,300.67 3,482.62 462165 6,01 512.674.05 47.39 -2.261.32 MWD(3) stairs, 9759 25.32 6376.94 6,30594 3,507,84 463233 6,010,796.14 512.889.52 41.47 -2.52.13 MWD (3) 8.265.93 98.5 11.73 6,3]2.72 6,301.72 3,53622 4,646.85 6,010,826.30 512699.03 4450 -2,2m.10 Mai 9025.82 97.26 mate 6060.63 6,29263 3,565.69 4,"9.08 6.010,055.&5 512.70121 487 -2.243.30 MWD(3) 9,005.9 9747 342.13 6,364]2 6293]2 3.595.21 4,"384 6,0108855 512,65]4 4953 .2,223.91 MrW(3) s0i 97.91 332.57 6,362.12 6,291.12 3,61293 4,536.5 6,01090307 512600.32 48,09 .2 Man MND(3) 9,006.17 7.35 323.03 6.359.38 6,280.30 3,630.10 4,65.30 6.01092031 51277.44 46.98 -2,19061 1(3) 9,12487 9264 3709 6,35561 6.204.61 3,800.5 4,60535 6,010,9405 512,65239 5511 816322 MND(3) 9,16522 9200 29490 6,351.55 6.280.55 3505]3 4.579.63 6,010.955.01 512,631.65 39.40 -213321 MND(3) 9,185.76 9261 289.24 6.34601 6,277.01 307217 4561.47 6.01 512,603.48 25.06 3,101 MAD (3) 9,21510 91.93 287." 6.347.64 6Mai TWs42 4.52365 6.010.978.13 512.575.65 634 3,74.39 MD (3) 9424506 929 266.95 6,346.55 6,275.55 3,695.30 4,495.05 6,010,905.5 512.54705 2.27 -2045.18 MD (3) 9.27524 94.02 28s7 6.31 6.27389 370461 4,166.40 6.010,994.56 512,518.39 810 -2915.71 WIND (a) 9.30532 93.53 291.53 6342.91 6.271,91 3.71502 4,430.25 61011e" 51240033 &32 -1985.13 WD (3) 8,335.26 91.00 294.14 6,341.57 6270.57 37MA3 4.410.69 6011,DI&M 512,462.66 IOM -1,956.45 MNO(3) 915513 9187 296.51 6310.66 6,269.% 3.73967 4,383.93 6,Oil ozar3 512,435.90 1485 .1,926.67 MrYO(3) 9.395,52 09.39 301.04 6.340.33 6,269.33 3]54.96 4,35266 6011 ,0.70 512.409.51 1186 -1,896.28 also (3) 9,425.64 Van 300.36 6.341.18 6,270.18 3,770.33 4,331,66 6,011,050.12 512,38381 201 -1.856.18 MM (3) 9,456.13 965 29954 6,34274 6,271.74 3,785.30 4,30516 6,011,075.07 51235200 632 -1.631 MND(3) 946534 scat 296.77 6.344.10 627310 3.7M.M 4279.32 6011.088.58 512,33123 224 -1.60650 MAD(3) 9514.93 9092 2955 6,344.0 6,273.40 30"01 4,25273 6.011,101.52 512304.62 11.43 -1.77207 MAD (3) 9.400 9256 294.14 6,343.50 6,28.50 3,024.15 4,22586 6911.fl3.83 512,271.77 6.72 -1.747.65 MD (3) Annotation TIP KOP Interpelabod Avmuth Interpolated Avmuth Inarpolated A2imah 10/19!1018 311 Parini COMPASS 500014 Hudd 880 Conoeolahillips O COf10C0F`hillips Definitive Survey Report Campany. ConiroPhillips(Alaska) Inc. Local Coordinate Relenence: Noll3W1 Pn1ec1: Kupamk Riven Unil TVD Referent.: 31-01® 71.Wus8 (31-01) Site: Kupamk 31 Pad MD Reference: 31-01®]1.04 11(3141) Well: 3W1 North Reference: Trim, Wellben: 3141 Survey Calculation Methal: Minimum Curvature Doll 3141 Database: EDT 14 Alaska Production Survey Map Map wnioal MD Inc Ad 114 TV055 .0114♦EIJ// Nomhirp DLS Ptlinp Section011Survey 1usn1 (1) P) (eam (U -ft) Ilan) lusRl (-1100'1 Tool hem AnlbiffiIOn RI IRI m 9.57592 9309 291 B.1 634193 627093 3.935.23 gt97,96 6.01.1.12580 512,249.33 7.29 -1716.99 MWO (3) 1 9605.80 9206 28914 634963 6,36963 3.847 03 4,169.09 6,011.136.64 612 96 7.89 -1.607,03 MAD (3) 9.635.76 92.M 30170 6,339.54 6260.54 3,856.66 4,140.74 6.011.14624 612,1MM 6.59 -1,657% MIND (3) 9.665.42 9249 215.54 6330.36 6 2673 3,885.15 4112.35 fi0tt154]0 51216421 767 -1.63883 MVVD(3) 9,695.40 9201 213.15 6336.91 6,265.91 3.1]25] 4.013.34 6,011.16209 512,135.19 3.17 -1,589.88 IMND(3) 9 n5.42 9&51 211]6 6,335.20 626420 3,17903 4,05483 6ll'IMS2 512,10592 4.88 -1,511,42 MWD (3) 9.]5561 19.66 MM 6339.36 6,26336 3,88403 402447 6811.174.28 512DM31 13.55 -1.542M MJVD(3) 9,]052] 8640 227.23 6,335.38 6,204.30 assess 3,995.18 6,011,178,79 512,047.@ 15.M -1.51525 ~(3) 9,01414 89.51 27093 6,335.44 6,26544 3,89354 3,145.01 6.011,10293 51201785 1189 -1.46773 MAD (3) 9046.04 88.74 27SW 6,336.91 6,265.91 3,09&29 3,935.10 6.011.117.69 511.955.94 263 -1.450.75 MAD (3) 9,675.28 17.40 277.32 6.337.16 626986 3,90235 3,505.16 6,011,191.67 511,958.00 619 -1.431.61 MND(3) 9.90.5.22 8526 275.52 6,339.51 6,258.51 3,914.69 36i"o. 6011104.00 511,928.29 7.26 -1.404.26 MND (3) 9 MAP 86.17 273.09 6.341.51 6,270.51 sail 3,11 6,011,197.37 511,090.25 6.05 -1.3]].04 MWD (3) B 865.2] 8565 270.% 630.3.66 6.M.63 3,809.24 3,7116 .8 6011,198.4 511.030.56 ID11 -1,M,75 MVJD(3) 10.@280 85.55 2]0.05 6.348.05 8.277.06 3,909.09 3,]60.12 6011199.05 511.81196 ,a. -130141 PROJECTED 10 TD i 101198018 3:13'10PM Pa9e4 CMI 5000148udd 850 rine BAKER HUGHES To: Date: November 6, 2018 Abby Bell AOGCC 333 West 7" Ave, Suite 100 Anchorage, Alaska 99501 From: 1180 87 29 97 4 Letter of Transmittal Michael Soper Baker Hughes INTEQ 795 East 94u Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3I-OlLlPB1 3I -01L1-03 3I-OlL1-04 3I-OlLl-05 31-OIL1 3I -01L1-02 (6) Total prints RECEIVE® Nov 0 7 2018 AOGCC Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael. Soper@BakerHughes.com 21 g0 g7 29974 ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01LlPB1 50-029-21514-70 Baker Hughes INTEQ BAi-�`UGHES a GE company Definitive Survey Report 19 October, 2018 ConocoPhillips ConocoPhillips Definitive Survey Report ' Company: ConocoPhillips (Alaska) Inc. Local Coordinate Reference: Well 31-01 Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @j 71.00usft (31-01) I Well: 31-01 North Reference: True j Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production 1 Project Kuparuk River Unit, North Slope Alaska, United States &FS 0 Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point .. 9 Map Zone: Alaska Zone 04 Using geodetic scale factor Well 31-01 Well Position +N/ -S 0.00 usft Northing: 6,007,285.50 usft Latitude: I 70° 25' 52.059 N +E/ -W 0.00 usft Easting: 508,056.44usft Longitude: 149° 56' 3.597 W ! Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 31-01LIPBI Magnetics Model Name Sample Date Declination Dip Angle Field Strength (°) (°) (nT) BGGM2018 9/1/2018 16 95 80.93 57,444 •. Design 31-01 L1 PB1 ' Audit Notes: ! Version: 1 0 Phase: ACTUAL Tie On Depth: 8,700.00 Vertical Section Depth From (TVD) +NAS +EI -W Direction (usft) (usft) (usft) - (1) 71.00 0.00 0.00 300.00 Survey Program Date From To Survey Survey (usft) (usft) Survey (Wellbore) Toot Name Description Start Date End Date 100.00 8,700.00 31-01 (31-01) GCT -MS Schlumberger GCT multishot 1/12/2001 ' 8,729.00 8,816.03 31-011 MWD-INC(31-010PB1) MWD-INC—ONLY MWD-INC—ONLY—FILLER 9/17/2018 9/17/2018 8,846.76 9,965.22 31-01 L1 FBI 1(31-01 L1 PBI) MWD MWD -Standard 9/17/2018 9/22/2018 _ 10/192018 3:13:10PM Page 2 COMPASS 5000.14 Build 85D Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 -^ Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey BA ER F�ffl Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth Interpolated Azimuth 10/19/2018 3:13aOPM Page 3 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +N/•S +E! -W Northing Eating DLS Section (usft) (°) (1) (usft) (usft) (usft) (usft) (°1100 Survey Tool Name 8,700.00 4302 84.27 6,301.21 6,230.21 3,394.68 4,439.47 6,010,684.63 512.491,80 0.89 -2,147.36 MWD-INC_ONLY (2) 8,729.00 43.08 84.19 6,322.41 6,251.41 3,396.67 4,459.17 6,010,686.64 512,511.49 0.28 -2,163.42 MWD -INC _ONLY (2) 8,755.41 48.39 7800 6,34084 6,26984 3,399.64 4,47782 6,010,689.63 512,530.14 26.17 -2,178.09 MWD-INC_ONLY (2) 8,786.00 58.11 71,00 6,359.14 6,288.14 3,406.26 4,501.35 6,010,696.28 512,553.67 36.65 -2,195.16 MWD-INC_ONLY (2) 8,81603 66.61 65.00 6,373.07 6,302.07 3,416.26 4,52597 6010,706.31 512,578.27 33.37 -2,211.47 MWD-INC_ONLY (2) 8,846.76 76.52 59.68 6,38218 6,311.78 3,429.81 4,55173 6,010,719.88 512,604.01 36.18 -2,227.01 MWD(3) 8,875.73 89.32 58.42 6,386.34 6,315.34 3,444.57 4,57633 6,010734.66 512,628.59 44.39 -2,240.94 MWD(3) 8,90577 97.82 52.04 6,384.47 6,313.47 3,46164 4,600.93 6,010,751,76 512,653.17 35.34 -2,253.70 MWD (3) 8,935.72 96.70 37.78 6,380.67 6,309.67 3,482.62 4,62165 6,010,772.76 512,674.06 47.38 -2,261.32 MWD (3) 8,965.61 97.58 25.32 6,376.94 6,305.94 3,507.84 4,637.33 6,010798.00 512,689.52 41.47 -2,262.13 MWD (3) 8,995.90 98.35 11.73 6,372.72 6,301.72 3,536.22 4,64665 6,010,826.38 512,699.00 44.50 -2,256.18 MWD (3) 9,025.82 9TM 356.96 6,368.63 6,297.63 3,565.69 4,649.08 6,010,855.85 512,701.21 48.97 -2,243.38 MWD (3) 9,056.17 9747 342.13 6,364.72 6,293.72 3,595.21 4,643.64 6,010,885.36 512,695.74 48.53 -2,223.91 MWD (3) 9,075.57 97.91 332.57 6,362.12 6,291.12 3,612.93 4,63525 6,010,903.07 512,688.32 48.89 -2,208.65 MWD(3) 9,096.17 9TM 323.03 6,359.38 6,288.38 3,630.18 4,625.38 6,010,920.31 512,677.44 45.98 -2,190.61 MWD(3) 9,124.87 97.64 307.06 6,355.61 6,284.61 3,650.26 4,60535 6,010,940.36 512,657.39 55.11 -2,163.22 MWD (3) 9,155.22 9169 294.99 6,351.55 6,280.55 3,66573 4,579.63 6,010,95581 512,631.65 39.48 -2,133.21 MWD(3) 9,185.76 92.61 289.24 6,348.81 6,277.81 3,677.17 4,55147 6,010,967.22 512,603.48 25.06 -2,103.10 MWD (3) 9,215.10 91.93 287.54 6,347.64 6.276.64 3,686.42 4,52365 6,010,976.43 512,575.65 6.24 -2,074.38 MWD (3) 9,24506 92.27 286.95 6,346.55 6,275.55 3,695.30 4,49505 6,010,985.28 512,547.05 2.27 -2,045.18 MWD (3) 9,275.24 94.02 289.07 6,344.89 6,273.89 3,70461 4,466.40 6,010,994.56 512,518.39 9.10 -2,015.71 MWD (3) 9,305.32 93.53 291.53 6,342.91 6,271.91 3,71502 4,43825 6,011,004.94 512,490.23 8.32 -1,986.13 MWD(3) 9,335.26 91.60 294.14 6,341.57 6,270.57 3,726.63 4,410.69 6,011,016.52 512,462.66 10.83 -1,956.45 MM (3) 9,365.13 91.87 298.51 6,340.66 6,269.66 3,739.87 4,38393 6,011,029.73 512,43590 14.65 -1,926.67 MWD (3) 9,395.52 89.39 301.09 6,340.33 6,269.33 3,754.96 4,35756 6,011,044.78 512,40951 1166 -1,896.28 MWD (3) 9,425.64 87.39 300.36 6,341.18 6,270.18 3,770.33 4,33168 6,011,060.12 512,383.61 7.01 -1,866.18 MWD (3) 9,456.13 8675 298.54 6,342.74 6,271.74 3,785.30 4,30516 6,011,07507 512,357.08 6.32 -1,835.73 MWD (3) 9,485.34 87.91 296.77 6,344.10 6,273.10 3,798.84 4,279.32 6,011 08858 512,331.23 7.24 -1,806.58 NIM (3) 9,514.93 90.92 295.23 6,344.40 6,273.40 3,811.81 4,25273 6,011,101.52 512,30462 11.43 -1,777.07 MWD(3) 9,544.49 92.58 294.14 6,343.50 6,272.50 3,824.15 4,225.88 6,011,11363 512,277.77 672 -1,747.65 MM (3) BA ER F�ffl Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth Interpolated Azimuth 10/19/2018 3:13aOPM Page 3 COMPASS 5000.14 Build 85D ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 Project: Kuparuk River Unit TVD Reference: 31-01 Q 71.00usft (31-01) Site: Kupamk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S -El-W Northing Easting DLS Section ( usft) (°) ° () (usft) (usk I usft ( ) usft ( ) (°/100') Survey Tool Name (ft) (ft) (ft) 9.57542 93.04 291.93 6,341.98 6,27098 3,836.23 4,19746 6,011,12588 512,249.33 7.29 .1,716.99 MWD (3) 9,605.80 92.06 289.74 6,340.63 6,269.63 3,647.03 4,16909 6,011,136.64 512,220.96 7.89 -1687.03 MWD (3) 9,635.76 9209. 287,78 6,339.54 6,268.54 3,856.66 4,14074 6,011,146.24 512,192.60 6.54 -1,657.66 MWD(3) 9,665.42 92.49 285.54 6,338.36 6,267,36 3,865.15 4,11235 8,011,154.70 512,164.21 767 -1,628.83 MWD (3) 9,695.40 93.04 283.15 6,336.91 6,265.91 3,872.57 4,083.34 6,011,16209 512,135.19 8.17 -1,599.99 MM/D(3) 9,725.42 93.51 281.76 6,335.20 6,264.20 3,879.03 4,054.08 6,011,16852 512,105.92 488 -1,571.42 MM/D(3) 9,755.61 89.66 280.38 6,334.36 6,263.36 3,884.83 4,024.47 6,011,174.28 512,076.31 13.55 -1,542.88 MWD (3) 9,785.27 86.40 277.23 6,335.38 6,264.38 3,889.36 3,995.18 6,011,178.79 512,047.02 1528 -1.515.25 MM (3) 9,814.96 89.51 278.93 6,336.44 6,265.44 3,893.54 3,965.81 6,011,182.93 512,01765 11.94 -1,487.73 MWD (3) 9,846.04 88.74 278.66 6,33691 6,265.91 3,898.29 3,935.10 6,011,187 64 511,986.94 2.63 -1,458.75 MWD(3) 9,875.28 87.48 277.32 6,337.88 6,266.88 3,902.35 3,906.16 6,011,191.67 511,958.00 6.29 -1,431.66 MWD (3) 9,905.22 86.26 275.52 6,339.51 6,268.51 3,905.69 3,876.46 6,011,194.98 511,928.29 7.26 -1,404.26 MWD (3) 9,935.42 86.17 27369 6,341.51 6,270.51 3,908.11 3,84642 6,011,197.37 511,896.25 6.05 -1,377.04 MWD (3) 9,96522 85.55 27066 6,343.66 6,272.66 3,909.24 3,816.72 6,011,198.47 511,868.56 10.35 -1,350.76 MWD(3) 10,022DO 85.55 27066 6,34606 6,277.06 3,909.89 3,760.12 6,011,199.06 511,811.96 0.00 -1,30141 PROJECTED to To Annotation Br' 1 �GHEgS 10/1912018 3:13: 1OPM Page 4 COMPASS 5000.14 Build 850 1 i rias BAKER HUGHES To: Date: November 6, 2018 Abby Bell AOGCC 333 West 7`h Ave, Suite 100 Anchorage, Alaska 99501 From: 80 87 29973 Letter of Transmittal Michael Soper Baker Hughes INTEQ 795 East 94`h Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3I-OlLlPBI 3I-OlL1-03 3I-OILI-04 3I -01L1-05 3I-OlLl 3I-OlLl-02 (6) Total prints RECENE® NOV 0 7 2018 AOGCC Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael.Soper@BakerHughes.com ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01 L1 50-029-21514-60 Baker Hughes INTEQ Definitive Survey Report 19 October, 2018 21 80 87 29973 BAT(ER UGHES a GE company F 10/19!1018 3:16:18PM Page 2 wmu 70" 25'52.059 N 149" 56' 3.597 W 0.00 usft Field Strength (nT) 57,444 COMPASS 5000.14 Build 85D ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConowPhilli s (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @ 71.0Ousft (31-01) :. Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Project Kuparuk River Unit, North Slope Alaska, United Slates Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 31-01 Well Position +N/ -S 0.00 usft Northing: 6,007,285.50 usft Latitude: -E/-W 0.00 usft Easting: 508,056.44usft Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: Wellbore 31-0111 Magnetics Model Name Sample Date Declination (1) Dip Angle (1) BGGM2018 9/1/2018 16.95 80.93 Design 31-0111 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,146.27 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (1) 71.00 0.00 0.00 270.00 10/19!1018 3:16:18PM Page 2 wmu 70" 25'52.059 N 149" 56' 3.597 W 0.00 usft Field Strength (nT) 57,444 COMPASS 5000.14 Build 85D ConocoPhillips Corm3coPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 Project Kupamk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kupamk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey Program Date 9/25/2018 9/25/2018 From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 100.00 8,600.00 31-01 (31-01) GCT -MS Schlumberger GCT multishot 1/12/2001 Northing 8,680.00 8,767.41 31-01 L1-03 MWD -INC (31-01-1-03) MWD-INC_ONLY MWD -INC -ONLY -FILLER 9/25/2018 9/25/2018 8,797.13 9,146.27 31-01 L1-03 MWD (31-011-1-03) MWD MWD - Standard 9/25/2018 9/29/2018 9,170.00 9,201.77 31-01 Li MWD -INC (31-0111) MWD -INC -ONLY MWD -INC -ONLY -FILLER 101`//2018 10/7/2018 9.231.46 11,607.13 31-01 Li MWD(31-01L1) MWD MWD -Standard 10/7/2016 10/9/2018 Survey 10/192018 3: 16: 18PM Page 3 COMPASS 5000.14 Build 85D R Map Map Vertical MD Inc Azl TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) 11 (1) (usft) (usft) (usft) (usft) (°1100') Survey Tool Name Annotation (ft) (ft) (ft) 9,146.27 96.77 6.65 6,34224 6,271.24 3,655.39 4,721.42 6,010,945.62 512,773.44 806 4,721.42 MWD (3) TIP 9,170.00 96.79 4.52 6,339.44 6,268.44 3,678.84 4,723.71 6,010,969.07 512,775.71 8.91 4,723.71 MWD -INC _ONLY (4) KOP 9,201.77 82.33 358.00 6,339.68 6,268.68 3,710.50 4,724.41 6,011,00673 512,776.37 4990 4,724.41 MWD-INC_ONLY (4) Interpolated Azimuth 9,231.46 75.22 348.74 6,34547 6,274.47 3,739.38 4,721.08 6,011,02960 512,773.01 3883 -0,721.08 MWD(5) 9,261.66 78.35 337.35 6,35240 6,281,40 3,767.44 4,712.51 6,011,057.65 512,754.41 38.14 4.712.51 MWD (5) 9,291.65 82.30 326.50 6,357.45 6,286.45 3,79347 4,698.61 6,011,08366 512,750.48 38.01 4,698.61 MWD (5) 9,321.64 87.48 315.82 6,360.13 6,289.13 3,81669 4,679.90 6,011,10686 512,731.75 39.44 4.679.90 MAD (5) 9,35166 92.61 305.51 6,360.10 6,289.10 3,836.22 4,657.17 6,011,126.36 512,708.99 38.35 4,657.17 MWD (5) 9,384.51 93.04 296.80 6,35848 6,287.48 3,853.18 4,629.11 6,011,14329 512,680.93 26.51 4629.11 MAD (5) 9,414.15 92.49 292.57 6,357.05 6,286.05 3,865.54 4,602.22 6,011,15562 512,654.02 14.37 1,602.22 MM (5) 9,444.49 93.84 291.87 6,355.38 6,284.38 3,876.99 4,574.18 6,011,167.04 512,625.97 5.01 1,574.18 MVV (5) 9,474.54 93.97 292.35 6,353.33 6,282.33 3,888.28 4,546.40 6,011,178.30 512,598.19 1.65 4546.40 MWD (5) 9,504.12 94.58 292.25 6,351.12 6,280.12 3,899.47 4,519.11 6,011,189.46 512,570.89 2.09 1,519.11 MWD(5) 9,534.43 9569 290.64 6,348.41 6,277.41 3,910.51 4,491.01 6,011,200.46 512,542.78 6.43 4,491.01 MM (5) 9,562.70 96.13 290.39 6,345.50 6,274.50 3,920.36 4,46468 6,011,210.29 512,516.44 1.79 1,464.68 MWD (5) 9,596.75 94.76 287.60 6,342.27 6,271.27 3,931.39 4,43263 6,01122128 512,484.38 9.10 1,432.63 NIM (5) 9,624.52 93.35 28354 6,340.30 6,269.30 3,938.83 4,405.95 6,011,228.69 512,457.70 1544 4,405.95 MWD(5) 9,654.99 92.92 283.05 6,33864 6,267.64 3,945.82 4,376.34 6,011,23565 512,428.08 2.14 4,376.34 MM (5) 9,664.19 92.52 280.29 6,337.25 6,266.25 3,951.72 4,347.78 6,011,241.52 512,399.52 9.54 -4,347.78 MWD (5) 10/192018 3: 16: 18PM Page 3 COMPASS 5000.14 Build 85D R ConocoPhillips ConocoPhillips Definitive Survey Report Company. ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey HA (ER fZ UGHES 10/192018 3:16: 18PM Page 4 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W DLS (usft) (% (°I (usft) (usft) lust[) (usft) Northing Easting (°1100') Section Survey Tool Name Annotation (ft) (ft) (ft) 9,714.35 92.61 279.30 6,335.90 6,264.90 3,956.85 4,318.09 6,011,246.61 512,36983 329 4,318. D9 MWD (5) 9,746.37 9366 279.55 6,334.15 6,263.15 3,962.08 4,286.55 6,011,251.81 512,338.28 3.37 4,286.55 MM (5) 9,775.24 92.79 27803 6,332.53 6,26153 3,966.49 4,258.07 6,011,256.19 512,303.80 6.06 4,25807 MWD (5) 9,80663 91.75 277.37 6,331.28 6,260.28 3,970.72 4,226.79 6,011,260.38 512,278.52 3.90 4,226.79 MM (5) 9,83493 90.74 276.36 6,330.67 6,259.67 3,974.07 4,198.90 6,011,263.71 512,250.62 5.08 4,198.90 MWD (5) 9,86508 92.89 277.86 6,329.71 6,258.71 3,977.80 4,169.00 6,011,267.41 512,22072 8.69 4169.00 MWD (5) 9,895.30 92.12 279.01 6,328.39 6,257.39 3,982.23 4,139.13 6,011,271.80 512,190.85 4.58 4,139.13 MWD (5) 9,925.11 90.18 278.58 6,327.79 6,256.79 3,985.79 4,109.68 6,011,276.33 512,161.40 6.67 4,10968 MWD (5) 9,954.45 90.06 278.72 6,327.73 6,256.73 3,991,20 4,080.67 6,011,280.71 512,132.39 0.63 4,060.67 MM (5) 9,984.21 91.35 280.59 6,327.36 6,256.36 3,996.19 4,051.34 6,011,285.67 512,103.06 7.63 4,051.34 MWD (5) 10,014.90 90.98 280.81 6,32674 6,255.74 4,001.89 4,021.19 6,011,291.33 512,072.90 1.40 4,021.19 MWD (5) 10,044.55 91.72 281.99 6,326.04 6,255.04 4,007.75 3,992.13 6,011,297.16 512,043.84 470 -3,992.13 MWD (5) 10,073.55 90.95 280.77 6,325.37 6,254.37 4,013.47 3,96371 6,011,302.84 512,015.42 4.97 -3,963.71 MWD (5) 10,104.35 87.79 276.46 6,325.70 6,254.70 4,018.08 3,933.27 6,011,307.42 511,984.98 17.35 -3,933.27 MWD (5) 10,134.39 87.88 276.38 6,326.84 6,255.84 4,021.44 3,903.44 6,011,310.75 511,955.15 0.40 -3,903.44 MWD (5) 10,164.51 88.16 276.76 6,327.88 6,256.88 4,024.88 3,873.54 6,011,314.16 511,925.24 1.57 -3,873.54 MWD (5) 10,193.89 89.17 276.01 6,328.56 6,257.56 4,028.15 3,844.35 6,011,317.39 511,896,05 4.28 -3,844.35 MWD (5) 10,223.99 89.36 273.20 6,328.95 6,257.95 4,030.56 3,814.35 6,011,31978 511,86606 9.36 -3,814.35 MWD (5) 10,254.59 89.66 271.61 6,32921 6,258.21 4,031.85 3,783.78 6,011,321.03 511,83549 5:29 -3,783.78 MWD (5) 10,284.34 90.00 272.01 6,329.30 6,258.30 4,032.79 3,754.05 6,011,321.94 .511,80575 1.76 -3,754.05 MWD (5) 10,313.75 92.06 271.18 6,328.77 6,257.77 4,033.61 3,724.65 6,011,32272 511,776.36 7.55 -3,724.65 MWD (5) 10,344.11 91,20 269.13 6,327.91 6,256.91 4,033.69 3,694.31 6,011,322.77 511,746.02 7.32 -3,694.31 MWD (5) 10,374.94 89.72 266.57 6,327.66 6,25666 4,032.53 3,663.50 6,011,321.58 511,715.22 959 -3,663.50 MM (5) 10,403.47 6625 26229 6,32666 6,257.66 4,02977 3,635.14 6,011,318.79 511,686.86 19.30 -3,635.14 MM (5) 10,434.27 84.87 261.87 6,331.05 6,26005 4,025.53 3,604.72 6,011,314.52 511 656.45 4.68 -3,60472 MWD (5) 10,46406 83.82 260.18 6,333.98 6,262.98 4,020.91 3,575.44 6,011,309.87 511,627.18 6.66 3,575.44 MWD (5) 10,493.67 83.88 258.98 6,337.16 6,266.16 4,015.59 3,546.49 6,011,304.51 511,598.24 4.03 3,546.49 MWD (5) 10,524.41 83.51 257.36 6,340.53 6,269.53 4,009.32 3,516.58 6,011,29822 511,568.34 5.37 -3,516.58 MWD (5) 10,554.13 8409 25566 6,343.74 6,272.74 4,002.43 3,48785 6,011,291.29 511,539.62 6.01 -3,487.85 MWD (5) 10,583.99 8354 25391 6,34696 6,275% 3,994.64 3,45921 6,011,283.47 511,510.99 6.11 -3,459.21 MAD (5) 10,61405 8307 25167 6,35046 6,27946 3,985.86 3,43068 6,011,27466 511,482.47 6.92 -3,430.68 MWD (5) HA (ER fZ UGHES 10/192018 3:16: 18PM Page 4 COMPASS 5000.14 Build 85D ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 j Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production 10,674.13 8501 251.62 6,356.39 6,285.39 3,966.85 3,374.00 6,011,255.59 Survey 1 6.43 -3,374.00 MWD (5) 10,703.77 87.30 Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S -El-W Northing OLS Easting Section - (usft) (°) (°) (usft) (usft) (usft) (usft) Survey Tool Name Annotation (°/100') ' 10/19/2018 3: 16: 18PM Page 5 COMPASS 5000.14 Build 85D (ft) (ft) (ft) 10,644.05 84.13 251.17 6,353.81 6,282.81 3,97641 3,402.40 6,011,265.18 511,454.21 4.23 -3,402.40 MVM (5) 10,674.13 8501 251.62 6,356.39 6,285.39 3,966.85 3,374.00 6,011,255.59 511,425.82 6.43 -3,374.00 MWD (5) 10,703.77 87.30 251.66 6,358.12 6,287.12 3,957.53 3,345.92 6,011,246.24 511,397.75 4.35 -3,345.92 MWD (5) 10,733.82 88.25 251.26 6,359.29 6,288.29 3.947.98 3,317,45 6,011,236.66 511,369.29 3.43 -3,317,45 MWD (5) 10,763.91 90.09 25168 6,359.73 6,288.73 3,938.42 3,288.92 6,011,227.07 511,340.78 6.27 -3,288.92 MWD (5) 10,793.46 89.75 250.08 6,359.77 6,288.77 3,928.74 3,261.01 6,011,217.37 511,312.88 5.54 -3,261.01 MM (5) 10823.93 89.48 247.25 6,359.7 6,288.97 3,917.65 3,232.63 6,011,206.25 511,284.51 9.33 3,232.63 MWD (5) 10,854.30 9021 247.28 6,360.05 6,289.05 3,905.92 3,204.62 6,011,194.49 511,256.52 2.41 -3,204.62 MM (5) 10,863.85 90.55 246.28 6,359.86 6,286.86 3,894.27 3,177.46 6,011,182.81 511,229.38 3.57 -3,177.46 MWD(5) 10,914.71 9049 24469 6,359.58 6,288.58 3,881.46 3,149.39 6,011,169.97 511,201.32 5.16 -3,149.39 MM (5) 10,944.84 91.60 243.86 6,359.03 6,288.03 3,868.39 3,122.25 6,011,156.87 511,174.20 4.60 -3,122.25 MM (5) 10,976.67 92.92 243.03 6,357.77 6,286.77 3,854.17 3,093.80 6,011,142.62 511,145.77 4.90 -3,093.80 MWD (5) 11,07.12 93.90 242.44 6,355.96 6,284.96 3,840.25 3,066.78 6,011,128.67 511,118.76 3,75 -3,066.78 MWD (5) 11,034.25 9,109 241.57 6,354.07 6,283.07 3,827.54 3,042.88 6,011,115.94 511,094.88 3.27 -3,042.88 MWD (5) 11,065.30 94.52 240.39 6,351.74 6,280.74 3,812.52 3,015.81 6,011,100.90 511,067.83 4.03 3,015.81 MWD (5) 11,095.10 94.15 23803 6,349.49 6,27849 3,797.31 2,990.28 6,011,085.66 511,042.32 7.99 -2,99028 MWD (5) 11,125.32 92.70 239.09 6,347.68 6,276.68 3,781.58 2,964.55 6,011,069.90 511,016.61 5.94 -2,964.55 MWD (5) 11,164.57 9209 24060 6,346.46 6,275.46 3,766.90 2,939.28 6,011,055.19 510,991.36 5.55 -2,93028 MM (5) 11,184.24 9148 242.32 6,345.54 6,274.54 3,752.73 2,913.23 6,011,041.W 510,965.32 6.15 -2,913.23 MWD (5) 11,214.45 92.80 244.57 6,344.41 6,273.41 3,739.24 2,886.23 6,011,027.48 510,938.34 8.63 -2,866.23 MWO(5) 11,244.33 9068 245.13 6,343.50 6,272.50 3,726.54 2,859.19 6,011,014.76 510,911.32 7.34 -2,859.19 MM (5) 11,274.80 90.46 246.99 6,343.20 6,272.20 3,714.18 2,831.35 6,011,002.36 510,883.49 6.15 -2,831.35 MWD (5) 11,304.31 90.21 249.06 6,343.02 6,272.02 3,703.14 2,803.98 6,010,991.29 510,856.14 7.07 -2,803.98 MWD (5) 11,333.85 9043 250.55 6,342.86 6,271.66 3,692.94 2,776.26 6,010,981.07 510,828.43 5.10 -2,776.26 MWD (5) 11,364.50 9132 251.85 6,342.39 6,271.39 3,683.07 2,747.25 6,010,971.16 510)99.44 5.14 -2,747.25 MWD (5) 11,394.08 89.85 252.85 6,342.09 6,271.09 3,674.10 2,710W 6,010,962.16 510,771.26 6.01 -2,719.W MWD (5) 11,424.05 89.23 254.94 6,342.33 6,271.33 3,66578 2,690.27 6,010,953.82 510,742.48 7.27 -2,69027 MWD (5) 11,453.45 89.45 2WA7 6,342.67 6,271.67 3,658.53 2,661.79 6,010,94653 510,714.01 5.26 -2,661.79 MWD (5) 11,490.45 90.09 256.94 6,342.82 6,271.82 3,650.02 2,62578 6,010,93299 510,678.01 2.15 -2,625.78 MWD (5) 11,521.55 90.65 257.51 6,342.62 6,271.62 3,643.14 2,595.45 6,010,931.08 510,64769 2.57 -2,59545 MWD (5) 11,551.23 91.72 25676 6,34200 6271.00 3,636.53 2,566.52 6.01092444 510,618.78 4.40 -2,566.52 MWD(5) 10/19/2018 3: 16: 18PM Page 5 COMPASS 5000.14 Build 85D 101192018 3:16:18PM Page 6 COMPASS 5000.14 Build 850 ConocoPhillips BA E�GER�N ConocoPhilli S Definitive Survey Repo ES m Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 Project Kuparuk River Unit TVD Reference: 31-01 (off 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Wetl: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey i Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section ! (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100') Survey Tool Name Annotation (ft) (ft) (ft) 11,584.07 92.89 259.79 6,340.68 6,26968 362987 2,53440 6,010,917.74 510,58666 9.88 -2,534.40 MWD (5) 11,607,13 93.16 259.30 6,339.46 6,268.46 3,625.69 2,511.75 6,010,913.54 510,564.02 2.42 -2,511.75 MWD (5) 11,642.00 93.16 25930 6,337.54 6,266.54 3,619.22 2,477.54 8,010,907.03 510,529.82 0.00 -2,477.54 PROJECTEDto TD 101192018 3:16:18PM Page 6 COMPASS 5000.14 Build 850 218087 BAF�UGHES PRINT DISTRIBUTION LIST 2 9 9 a GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 31-OILIPBI FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(cD,bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&G WO Wells Admin Brenda Classmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 3 Exxon Mobil, Alaska �Aftn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4. State of Alaska -AOGCC Atm: Natural Resources Technician 11 1333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5DNR -Division of0il&Gas *** '.Alta: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 RP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 No ce sign and return one copy of this transmittal form to: 3coPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) G Street. forage, Alaska 99510 LOG TYPE GR - RES LOG DATE October 6, 2018 TODAYS DATE October 31, 2018 Revision Details: Rev. Requested by: -- FIELDI FINAL CD/DVD I FINAL PRELIM (las, dlis, PDF, META, I SURVEY REPORT LOGS LOGS CGM, Final Surveys) I (Compass) # OF PRIN UF PRIN # OF COPIES 1# OF COPIES 1# OF COPIES w-,cC'.E1VED 0 0 I 0 0 TOTALS FOR THIS PAGE: 0 1 3 0 0 21807 BA ER %' PRINT DISTRIBUTION LIST 2 9 9 4 9 F UGHES a GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 3I -01L1 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(o�bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V BP North Slope. EOA, PBOC, PR&20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 9011 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico ATO 708 700 G Sheet Anchorage, AK 99510 3 i ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Atm: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas `** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 �-- Stamp "confidential" on all material deliver In DNR Nn :e sign and return one copy of this transmittal form to: DcoPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) G Street. forage, Alaska 99510 LOG TYPE GR - RES LOG DATE October 6, 2018 TODAYS DATE October 31, 2018 Revision Details: Rev. Requested by: --- FIELD/ FINALCDIDVD FINAL PRELIM (las, dlis, PDF, META, SURVEY I REPORT LOGS LOGS CGM, Final Surveys) (Compass) # OF PRINTSIs OF PRIN # OF COPIES I# OF COPIES 1# OF COPIES _V--1vEO 01 11 1 10 0 6'. BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 3 0 0 STATE OF ALASKA Reviewed OIL AND GAS CONSERVATION COMMISSION P.I. Supry BOPE Test Report for: KUPARUK RIV UNIT 31-OILI v Comm Contractor/Rig No.: Nabors CDR3AC PTD#: 2180870 DATE: 9/152018 " Inspector Brian Bixby - Insp Source. Operator: CONOCOPHILLIPS ALASKA, INC. Operator Rep: S. Kiser / J. Newell Rig Rep: R. Madson / D. Johnsto Inspector Type Operation: DRILL Sundry No: Test Pressures: Rams: Annular: valves: MASP; Type Test: NIT 250/4900 ' 250/2500' 250/4900 4829 Inspection No: bopBDB180916141144 Related Insp No: FLOOR SAFTY VALVES: Quantity TEST DATA Upper Kelly 0 NA Lower Kelly MISC. INSPECTIONS: MUD SYSTEM: Ball Type ACCUMULATOR SYSTEM: P - InsideBOP 0 P/F FSV Misc Visual Alarm _ 1 Time/Pressure P/F Location Gen.: P Trip Tank P P - System Pressure 3050 P Housekeeping: P Pit Level Indicators P P - ;Pressure After Closure 2300 P PTD On Location P Flow Indicator P P 200 PSI Attained 23 P Standing Order Posted P Meth Gas Detector P P - Full Pressure Attained 56 P Well Sign P H2S Gas Detector P P " Blind Switch Covers: YES P Drl. Rig P MS Mise 0 NA Nitgn. Bottles (avg): 4@2050 P ' Hazard Sec. P ACC Mise 0 NA Misc NA FLOOR SAFTY VALVES: BOP STACK: Quantity Size P/F Stripper Quantity P/F Upper Kelly 0 NA Lower Kelly _ 0 _._ NA_ Ball Type - 2 P - InsideBOP 0 NA_ FSV Misc 0 NA _ 1 BOP STACK: Quantity Size P/F Stripper 1_2" _P P/F Annular Preventer 1 ' 71/16" _ P #1 Rams 1 Blind/Shear P #2 Rams 1 - 2" Combi P ' #3 Rams _ 1 2 3/8" Combi P #4 Rams 1 2 3/8" Combi P ' #5 Rams 1 - Blind/Shear ' P ' #6 Rams 1 2" P Choke Ln. Valves 2, 2 1/16" P HCR Valves 4 - 2 1/16" P Kill Line Valves 7 2 1/16" FP '! 1 Check Valve 0 NA BOP Misc 2 '2 1/16" P ' CHOKE MANIFOLD: Quantity P/F No. Valves 12 - P " Manual Chokes 1 P Hydraulic Chokes 1 P CH Misc 0 NA INSIDE REEL VALVES: (Valid for Coil Rigs Only) Quantity P/F Inside Reel Valves 1 P Number of Failures: 2 Test Results Test Time 6.5 Remarks: Test all PV F's and Gas Alarms, R2 and B7 failed were greased and passed the retest. THE STATE °f.L.V -- GOVERNOR BILL WALKER William R. Long Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3I-01 L 1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-087 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax 907.276.7542 www.aogcc.alasko.gov Surface Location: 344' FSL, 179' FWL, SEC. 31, TI 3N, R9E, UM Bottomhole Location: 1368' FNL, 2070' FWL, SEC. 31, TI 3N, R9E, UM Dear Mr. Long: Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit 185-307, API 50-029-21514-00- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair �L DATED this3'� day of August, 2018. I STATE OF ALASKA ALI A OIL AND GAS CONSERVATION COMMI� .ON PERMIT TO DRILL 7O AAC 25 nn5 RECEIVE® JUL 2 0 2043 1 a. Type of Work: I lb. Proposed Well Class: Exploratory -Gas ❑ Service - WAG ❑ Service - Disp ❑ if 1c. Sni welii pWtised for: . ❑ Drill ❑ Lateral ❑Q Stratigraphic Test F-1Development- Oil Q • Service - Winj El Single Zone Q • CoaltYe l? Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development -Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q - Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 5952180 ' Kuparuk Riv Unit 31-OlLl 3. Address: 6. Proposed Depth: -7VP ° (2Z -tee_ 12. Field/Pool(s): PO Box 100360 Anchorage, AK 99510-0360 MD: 11,900 TVD -"' 5. 6225 Kuparuk River Kuparuk River Oil 4a. Location of Well (Governmental Section): 7. Property Designation: b� Z� f$ Surface: 344' FSL, 179' FWL, Sec. 31, T13N, R9E, UM ADL 25521 ' Top of Productive Horizon: 8. DNR Approval Number: 13, Approximate Spud ate: 1540' FNL, 625' FEL, Sec. 31, T13N, R9E, UM LO/NS 83-130 8131 18 911&Aq 9. Acres in Property: 14. Distance to Varest Property: Total Depth: 1368' FNL, 2070' FWL, Sec. 31, T13N, R9E, UM 2555 18,980' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 71 15. Distance to Nearest Well Open Surface: x- 508056 y- 6007286 ' Zone- 4 GL / BF Elevation above MSL (ft): 40 to Same Pool: 513' (31-03) 16. Deviated wells: Kickoff depth: 8730 feet • 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 101 degrees Downhole: 5456 • Surface: 4829 . 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.6# L-80 ST -L 1250 10,650 _Galla 11,900 • Un -Cemented •� Y 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 9030 6542 N/A 8919 6460 8782 Casing Length Size Cement Volume MD TVD Conductor/Structural 73' 16" 274 Sx CS II 104' 104' Surface 4315' 9-5/8" 1650 Sx AS III 8 320 Sx Class G 4346' 3304' Intermediate Production 8986' 7" 300 Sx Class G 8 175 Sx AS 1 9010' 6528' Liner Perforation Depth MD (ft): 8734-8760,8770-8798 Perforation Depth TVD (ft): 6326-6345,6352-6373 Hydraulic Fracture planned? Yes ❑ No Q . 20. Attachments: Property Plat ❑ OP Sket h Drilling Program v. Depth Plot ha ow azar ysis Divertter Sketch e Seabed Report e DriTng Fluid Program e 20 AAC 25.050 requ emlentse 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: William R. Long Authorized Name: William R. Long Contact Email: William.R.Lon COP.corn Authorized Title: Staff CTD En ineer Contact Phone: 907-263-4372 I �� Authorized Signature:Date: Commission Use Only Permit to Drill ff�� ` 419- API Number: ` Permit Approv %� See cover letter for other Number: � / r!/ 50- � � �5�`)"" •(.�1-�-� Date: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane gas hydrates, or gas contained in shales: No Other:Samples '00/0 tCSt 710 g-/00 P 3/ req'd: Yes Nov Mud log req'd: Yes❑; Yes V No❑ f9nnv(c(r nrcVrn-frr ri'S� to /- z5��5HSmeasures. Yes No�❑/ Directional svy req'd: Yes ❑ No L✓I Inclination -only svy req'd: Yes E] No� Spacing excLption req'd: ❑ Post initial injection MIT req'd: Yes No APPROVED BY > � i >� t -7-) V. Approved by: COMMISSIONER THE COMMISSION Date: ( 1177-612 9 / /f py�ry�w /A� ` Submit Form and Form 10-401 Revised 5/2017 is pe I5 valid for 24 \/ fr€�t�al�r al per 20 AAC 25.00 (g) Attachments in Duplicate ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 July 20, 2018 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the KRU 31-01 (PTD# 185-307) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin in August 2018. The objective will be to drill sig laterals, KRU 31-01 L1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-01 L1-04, and 31-01 L1-05, targeting the Kuparuk A -sand interval. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20--- AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 31-011-1, 31-011-1-01, 31-01L1-02, 31-011-1-03, 31-011-1-04, and 31-01L1-05 - Detailed Summary of Operations - Directional Plans for 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01 L1-05 - Current wellbore schematic - Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-263-4372. Sincerely, William R. Long Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01L1-05 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) ........................ ............ ............. ............... ........ ........ ............2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2)).. ... _........... ......._.....-..... ............. ............... ........ ...... ..................... ............................_...2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3)). _......... ... .................... ....... .............. .......... ..._......_.... ......... .... .... 2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005 (c)(4)). ....--................ _...... .................. ............. ....................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))... ....._._..._.. .................. __.._................. _......... ................ ..................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6)).. ... _........................... .. ................... ...... _........... ............ .3 7. Diverter System Information ..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7)).. ........... ........ ..........._.. ............................... ..... ....................... ..__.. ....................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(3)) ... .............. ................. ........ ................ ....-...... . .............. ..............3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9)).. _........... ......... ... ......................___. ..... ......... .......... 4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AA C 25.005(c)(10)) ........ ........... ..........._.. ............ ........_._.. _...... ................ ........... ................4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11)) ..... ............ ............ ................. - ................... .................. ........... ............4 12. Evidence of Bonding...................................................................................................................... 4 (Requirementsof 20AAC25.005(c)(12)) ................. .......... ... .............. __.......4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20AAC 25.005(c)(13)) ............_ ...................... ...................................... ............. ..... ....... ...................... .4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................6 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14))....... .............. .... .......... ..... .... ....... ........... __....... .............._ ................6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 7 (Requirements of 20 AAC 25.050(b)) .... ...................... _...... .................... .......... ........... .............. ......... .._... ..................7 16. Attachments....................................................................................................................................7 Attachment 1: Directional Plans for 31-011-1, 31-0111-01, 31-0111-02, 31-01 L1-03, 31-011-1-04, and 31-01 L1-05 laterals. .........................................................................................................................................................................................7 Attachment 2: Current Well Schematic for 31-01.............................................................................................................7 Attachment 3: Proposed Well Schematic for 31-01 L1, 31-01 L1-01, 31-011-1-02, 31-01 L1-03, 31-01 L1-04, and 31-0111-05 laterals............................................................................................................................................................................. 7 Page 1 of 7 June 27, 2018 PTD Application: 31-011-7, 31-011-1-01, 31-01L1-02, 31-011-1-03, 31-01L1-04, and 31-0l Ll -05 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01 L1-05. All laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 forms for surface and subsurface coordinates of each of the laterals. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4900 psi. Using the maximum formation pressure in the area of 5456 psi at the datum in 3N-05 (i.e. 16.7 ppg EMW), the maximum potential surface pressure in 31-01, assuming a gas gradient of 0.1 psi/ft, would be 4829 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 31-01 was measured to be 3943 psi at the datum (12.1 ppg EMW) on 5/3/2018. ✓ The maximum downhole pressure in the 31-01 vicinity is the 3N-05 at 5456 psi at the datum or 16.7 ppg EMW. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) il No specific gas zones will be drilled; gas injection has been performed in this area, so there is a chance of encountering gas while drilling the 31-01 laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 31-01 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 31-01 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 7 June 27, 2018 PTD Application: 31-011_1, 31-011_1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-011_1-05 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 31-011_1 10,650 11,900 6318 6225 2%" 4.7#, L-80, ST -L slotted liner; Surface 104 1640 670 Surface alumin,um billet on to 36 J-55 BTC Surface 4346 2%", 4.7#, L-80, ST -L slotted liner; 31-01Ll-01 9200 12,250 6281 6290 aluminum billet on to J-55 BTC Surface 9010 Surface 2%", 4.7#, L-80, ST -L slotted liner; 31-01Ll-02 9085 11,925 6282 6212 aluminum billet on to E1JE8rd Mod Surface 8747 Surface 6336 2%", 4.7#, L-80, ST -L slotted liner; 31-01 L1-03 10,100 12,000 6225 6204 aluminum billet on to 31-01 L1-04 9300 12,000 6258 6232 2%", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 2%", 4.7#, L-80, ST -L slotted liner; 31-011_1-05 8725 12,050 6248 6188 deployment sleeve on to Existing Casing/Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD TVD TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded Surface 104 Surface 104 1640 670 Surface 9-5/8" 36 J-55 BTC Surface 4346 Surface 3305 3520 2020 Production 7- 26 J-55 BTC Surface 9010 Surface 6528 4980 4320 Tubing 3-1/2" 9.3 L-80 E1JE8rd Mod Surface 8747 Surface 6336 10,160 10,540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Water based Power -Vis milling fluid (8.6 ppg) — Drilling operations: Water based Power -Pro drilling mud (8.6 ppg). This mud weight may not hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The 31-01 contains a downhole deployment valve allowing deployment of tool strings and liner without pumping kill weight fluid. If the valve does not hold, BHA's will be deployed using standard pressure deployments and the well will be loaded with 12.1 ppg NaBr completion fluid in order to provide formation over -balance and maintain wellbore stability while running completions. If higher formation pressures are encountered the completion brine will be weighted up with sodium bromide or potassium formate. Page 3 of 7 June 27, 2018 PTD Application: 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-11-03,31-011-1-04, and 31-01L1-05 Managed Pressure Drilling Practice ' Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". i In the 31-01 laterals we will target a constant BHP of 12.1 EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 31-01 Window 8728' MD, 6322' TVD Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 31-01 is a Kuparuk producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize laterals to target the Kuparuk sands to the west and north of the existing 31-01 wellbore. The laterals will increase throughput and recovery from a potentially sheltered corner of a fault block. A recent rig workover installed tandem wedges to facilitate cutting a window with CTD. Prior to CTD operations E -line will set an inner wedge in the tandem wedge. CDR3-AC will mill a window in the tubing and casing using the tandem wedge like a whipstock. Page 4 of 7 June 27, 2018 Pumps On 1.8 bpm) Pumps Off Formation Pressure 12.1 3978 psi 3978 psi Mud Hydrostatic 8.6 2827 psi 2827 psi Annular friction i.e. ECD, 0.080psi/ft) 698 psi 0 psi Mud + ECD Combined no chokepressure) 3525 psi underbalanced -453psi) 2827 psi underbalanced -1151psi) Target BHP at Window 12.1 3978 psi 3978 psi Choke Pressure Required to Maintain Target BHP 453 psi 1151 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 31-01 is a Kuparuk producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize laterals to target the Kuparuk sands to the west and north of the existing 31-01 wellbore. The laterals will increase throughput and recovery from a potentially sheltered corner of a fault block. A recent rig workover installed tandem wedges to facilitate cutting a window with CTD. Prior to CTD operations E -line will set an inner wedge in the tandem wedge. CDR3-AC will mill a window in the tubing and casing using the tandem wedge like a whipstock. Page 4 of 7 June 27, 2018 PTD Application: 31-01L1, 31-011-1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-01L1-05 Pre -CTD Work 1. RU Slickline: Pull SOV and set GLVs. 2. RU E -line: Set inner wedge. 3. Prep site for Nabors CDR3-AC. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 31-OIL1 Lateral (A sand -West) a. Mill 2.80" window at 8728' MD. ' b. Drill 3" bi-center lateral to TD of 11,900' MD. c. Run 2%" slotted liner with an aluminum billet from TD up to 10,650' MD. 3. 3I-OILI-01 Lateral (A sand -West) a. Kickoff of the aluminum billet at 10,650' MD. b. Drill 3" bi-center lateral to TD of 12,250' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 9200' MD. 4. 3I-0IL1-02 Lateral (A sand -West) a. Kick off of the aluminum billet at 9200' MD. b. Drill 3" bi-center lateral to TD of 11,925' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 9085' MD. 5. 3I-01 LI -03 Lateral (A sand -North) a. Kick off of the aluminum billet at 9085' MD. b. Drill 3" bi-center lateral to TD of 12,000' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 10,100' MD. 6. 3I-OIL1-04 Lateral (A sand -North) a. Kickoff of the aluminum billet at 10,100' MD. b. Drill 3" bi-center lateral to TD of 12,000' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 9300' MD. 7. 3I-OIL1-03 Lateral (A sand- West) a. Kickoff of the aluminum billet at 9300' MD. b. Drill 3" bi-center lateral to TD of 12,050' MD. c. Run 2%" slotted liner with deployment sleeve from TD up to 8725' MD. 8. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC. Post -Rig Work 1. Return to production. Page 5 of 7 June 27, 2018 PTD ADDIICation: 31-011-1, 31-011-1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-01L1-05 Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure, so installed in this well is a deployment valve. This valve, when closed using hydraulic control lines from surface, isolates the well pressure and allows long BHA's to be deployed/un-deployed without killing the well. If the deployment valve fails, operations will continue using the standard pressure deployment process. A system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process During BHA deployment, the following steps are observed. - Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slick -line. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running - The 31-01 well has a deployment valve installed. It will serve to deploy liners into the newly drilled laterals. If the valve fails, the laterals will be displaced to an overbalance completion fluid (as detailed in Section 8 "Drilling Fluids Program') prior to running liner. - While running 2%" slotted liner, a joint of 2%" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2%" rams will provide secondary well control while running 2%" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). Page 6 of 7 June 27, 2018 PTD Application: 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-01L1-04, and 31-01L1-05 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance ft 31-01 L1 18,980 31-01 L1-01 18,740 31-01 L1-02 18,990 31-01 L1-03 20,930 31-01 L1-04 20,815 31-01 L1-05 20,845 Distance to Nearest Well within Pool Lateral Name Distance ft Well 31-01 L1 513 31-03 31-01Ll-01 718 31-03 31-01L1-02 513 31-03 31-01 L1-03 159 3M-04 31-OlLl-04 159 3M-04 31-01Ll-05 159 3M-04 16. Attachments Attachment 1: Directional Plans for 31-01L1, 31-01L1-01, 31-01L1-02, 31-011-1-03, 31-01L1-04, and 31-01L1-05 laterals. Attachment 2: Current Well Schematic for 31-01.. Attachment 3: Proposed Well Schematic for 31-01L1, 31-01L1-01, 31-01L1-02, 31-O1L1-03, 31-01L1-04, and 31- 01 L 1-05 laterals. Page 7 of 7 June 27, 2018 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 31 Pad 31-01 31-01 L1 Plan: 31-01 L1_wp02 Standard Planning Report 19 July, 2018 BPIR HES company ConocoPhillips gp R ConocoPhillips Planning Report t{UGHES aGEcompany Database: EDT Alaska Sandbox Company: ConocoPhillips (Alaska) Inc.-Kup2 Project: Kuparuk River Unit Site: Kupawk 31 Pad Well: 31-01 Wellbore: 31-011-1 Design: 31-011-1 wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 31-01 Mean Sea Level 31-01 @ 71.00usft (31-01) True Minimum Curvature Project Kupamk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kupawk 31 Pad Model Name Sample Date Declination 1°I Site Position: Northing: 6,007,285.50 usft Latitude: 70° 25' 52.059 N From: Map Easting: 508,056.44 usft Longitude: 149° 563.597 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.06 ' Well 31-01 Well Position +N/S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 31-011-1 6,007,285.50 usft Latitude: 70° 25'52.059 N 508,056.44 usft Longitude: 149° 563.513 6' 3.597 W usft Ground Level: 0.00 usft Magnegcs Model Name Sample Date Declination 1°I BGGM2018 9/1/2018 Design 31-0IL1_wp02 Audit Notes: Version: Phase: PLAN Vertical Section: Depth From (TVD) +N/-3 (usft) (usft) 0.00 0.00 Dip Angle Field Strength (nT) 16.95 _ 80.93 57 444 Te On Depth: 8,700.00 +E/ -W Direction (usft) 0.00 300.0. 00 JJJ 7719/2018 12:51:38PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips BA R ConocoPhillips Planning Report hIUGHES a GE company Database: EDT Alaska Sandbox Local Coordinate Reference: Well 31-01 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 31-01 @ 71.00usft(31-01) Site: Kuparuk 31 Pad North Reference: True Well: 31-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-0111 TVD Below Design: 31-OILI vvp02 Dogleg Build 7/192018 12 51 Page 3 COMPASS 5000.14 Build 85 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/S +E/ -W Rate Rate Rate TFO (usft) (') (1) (usft) (usft) (usft) (°/100ft) (°1100ft) (°/100th) V) Target 8,700.00 43.02 84.27 6,230.21 3,394.68 4,439.47 0.00 0.00 0.00 0.00 8,730.00 43.09 84.18 6,252.13 3,396.74 4,459.85 0.31 0.23 -0.30 -41.31 8,755.00 47.03 81.11 6,269.79 3,399.02 4,477.39 18.00 15.76 -12.29 330.00 8,873.97 96.00 57.26 6,306.86 3,440.83 4,577.55 45.00 41.16 -20.05 330.00 8,990.44 98.40 4.45 6,291.15 3,536.35 4,634.78 45.00 2.06 45.34 276.00 9,110.44 90.13 310.88 6,281.52 3,642.79 4,590.70 45.00 -6.90 -44.64 264.00 9,410.44 90.12 289.88 6,280.87 3,793.66 4,333.34 7.00 0.00 -7.00 270.00 9,760.00 89.69 265.41 6,281.44 3,839.81 3,989.52 7.00 -0.12 -7.00 269.00 9,845.00 84.54 262.43 6,285.71 3,830.83 3,905.14 7.00 -6.06 -3.51 210.00 9,950.00 89.29 268.05 6,291.36 3,822.15 3,800.72 7.00 4.52 5.36 50.00 10,125.00 89.30 255.80 6,293.52 3,797.62 3,627.80 7.00 0.01 -7.00 270.00 10,325.00 88.84 269.80 6,296.77 3,772.61 3,429.90 7.00 -0.23 7.00 92.00 10,425.00 88.85 262.79 6,298.79 3,766.16 3,330.19 7.00 0.01 -7.00 270.00 10,550.00 81.70 257.74 6,309.09 3,745.14 3,207.52 7.00 -5.72 -4.05 215.00 10,650.00 88.59 256.52 6,317.55 3,722.95 3,110.45 7.00 6.89 -1.21 350.00 10,750.00 90.99 249.95 6,317.92 3,694.13 3,014.76 7.00 2.40 -6.58 290.00 10,900.00 96.20 259.08 6,308.49 3,654.18 2,870.70 7.00 3.48 6.09 60.00 11,100.00 100.78 272.46 6,278.83 3,639.49 2,673.96 7.00 2.29 6.69 70.00 11,250.00 93.95 280.50 6,259.57 3,656.34 2,526.38 7.00 4.56 5.36 130.00 11,500.00 93.77 262.97 6,242.61 3,663.86 2,278.04 7.00 -0.07 -7.02 270.00 11,700.00 92.21 249.03 6,232.13 3,615.64 2,084.73 7.00 -0.78 -6.97 264.00 11,900.00 92.14 263.04 6,224.50 3,567.54 1,891.27 7.00 -0.03 7.00 90.00 7/192018 12 51 Page 3 COMPASS 5000.14 Build 85 ConocoPhillips g ER ConocoPhillips Planning Report FUGHES a GE.o pany Database: Company: Project: Site: Well: Wellbore: Design: EDT Alaska Sandbox ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kupamk 31 Pad 31-01 31-OILI 31-01L1_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 31-01 Mean Sea Level 31-01 @ 71.00usft (31-01) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +NIS +E/•W Section Rate Azimuth Northing Easting (usft) (a) (_) (usft) (usft) (usft) (usft) (.1100ft) 0 (usft) (usft) 8,700.00 43.02 84.27 6,230.21 3,394.68 4,439.47 -2,147.36 0.00 0.00 6,010,68463 512,491.80 TIP 8,730.00 • 43.09 84.18 6,252.13 3,396.74 4,459.85 -2,163.98 0.31 -41.31 6,010,686.71 512,512.18 KOP 8,755.00 47.03 81.11 6,269.79 3,399.02 4,477.39 -2,178.03 18.00 -30.00 6,010,689.01 512,529.71 End 18 dls, Start 45 dis 8,800.00 65.16 70.11 6,294.84 3,408.61 4,513.23 -2,204.27 45.00 -30.00 6,010,698.64 512,565.54 8,873.97 96.00 57.26 6,306.86 3,440.83 4,577.55 -2,243.86 45.00 -23.78 6,010,730.93 512,629.81 4 8,900.00 97.09 45.52 6,303.88 3,456.94 4,597.72 -2,253.27 45.00 -84.00 6,010,747.06 512,649.97 8,990.44 98.40 4.45 6,291.15 3,536.35 4,634.78 -2,245.66 45.00 -85.34 6,010,826.50 512,686.93 6 9,000.00 97.93 0.13 6,289.79 3,545.80 4,635.16 -2,241.26 45.00 -96.00 6,010,835.95 512,687.30 9,100.00 90.97 315.50 6,281.62 3,635.65 4,598.31 -2,164.43 45.00 -96.61 6,010,925.75 512,650.36 9,110.44 90.13 310.88 6,281.52 3,642.79 4,590.70 -2,154.27 45.00 -100.27 6,010,932.88 512,642.75 End 46, Start 7 dls 9,200.00 90.13 304.61 6,281.32 3,697.59 4,519.92 -2,065.57 7.00 -90.00 6,010,987.60 512,571.91 9,300.00 90.12 297.61 6,281.10 3,749.22 4,434.35 -1,965.65 7.00 -90.01 6,011,039.13 512,486.30 9,400.00 90.12 290.61 6,280.89 3,790.04 4,343.13 -1,866.24 7.00 -90.03 6,011,079.85 512,395.04 9,410.44 90.12 289.88 6,280.87 3,793.66 4,333.34 -1,855.95 7.00 -90.04 6,011,083.45 512,385.25 7 9,500.00 90.01 283.61 6,280.76 3,819.45 4,247.62 -1,768.82 7.00 -91.00 6,011,109.15 512,299.51 9,600.00 89.89 276.61 6,280.85 3,836.99 4,149.23 -1,674.85 7.00 -91.01 6,011,126.58 512,201.11 9,700.00 89.77 269.61 6,281.16 3,842.41 4,049.44 -1,585.71 7.00 -91.00 6,011,131.90 512,101.33 9,760.00 89.69 265.41 6,281.44 3,839.81 3,989.52 -1,535.12 7.00 -90.98 6,011,129.23 512,041.41 8 9,800.00 87.27 264.01 6,282.50 3,836.13 3,949.70 -1,502.48 7.00 -150.00 6,011,125.51 512,001.60 9,845.00 84.54 262.43 6,285.71 3,830.83 3,905.14 -1,466.53 7.00 -149.96 6,011,120.16 511,957.05 9 9,900.00 87.03 265.38 6,289.75 3,825.01 3,850.60 -1,422.22 7.00 50.00 6,011,114.28 511,902.53 9,950.00 89.29 268.05 6,291.36 3,822.15 3,800.72 -1,380.45 7.00 49.78 6,011,111.37 511,852.65 10 10,000.00 89.29 264.55 6,291.98 3,818.92 3,750.84 -1,338.86 7.00 -90.00 6,011,108.09 511,802.78 10,100.00 89.30 257.55 6,293.22 3,803.38 3,652.12 -1,261.14 7.00 -89.96 6,011,092.44 511,704.09 10,125.00 89.30 255.80 6,293.52 3,797.62 3,627.80 -1,242.96 7.00 -89.87 6,011,086.66 511,679.77 11 10,200.00 89.12 261.05 6,294.55 3,782.58 3,554.36 -1,186.87 7.00 92.00 6,011,071.54 511,606.35 10,300.00 88.90 268.05 6,296.28 3,773.08 3,454.88 -1,105.48 7.00 91.93 6,011,061.93 511,506.90 10,325.00 88.84 269.80 6,296.77 3,772.61 3,429.90 -1,084.07 7.00 91.81 6,011,061.44 511,481.92 17 10,400.00 88.85 264.54 6,298.29 3,768.91 3,355.03 -1,021.08 7.00 -90.00 6,011,057.66 511,407.06 10,425.00 88.85 262.79 6,298.79 3,766.16 3,330.19 -1,000.95 7.00 -89.89 6,011,054.87 511,382.23 13 10,500.00 84.55 259.77 6,303.11 3,754.82 3,256.20 -942.54 7.00 -145.00 6,011,043.46 511,308.26 10,550.00 81.70 257.74 6,309.09 3,745.14 3,207.52 -905.23 7.00 -144.83 6,011,033.73 511,259.60 14 10,600.00 85.14 257.13 6,314.82 3,734.33 3,159.05 -868.65 7.00 -10.00 6,011,022.87 511,211.14 10,650.00 88.59 256.52 6,317.55 3,722.95 3,110.45 -832.25 7.00 -9.93 6,011,011.44 511,162.55 1s 10,700.00 89.79 253.23 6,318.26 3,709.91 3,062.19 -796.98 7.00 -70.00 6,010,998.35 511,114.31 10,750.00 90.99 249.95 6,317.92 3,694.13 3,014.76 -763.79 7.00 -69.95 6,010,982.51 511,066.91 16 7/19/1018 12:51:38PM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips gp R ConocoPhillips Planning Report F�UGHES a GE compary Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well 31-01 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 31-01 Q 71.00usft (31-01) Site: Kuparuk 31 Pad North Reference: True Well: 31-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-01LI Depth inclination Design: 31-01 L1_wp02 -NI-S +El -W Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth inclination Azimuth System -NI-S +El -W Section Rate Azimuth Northing Easting (usft) (•) (a) (usft) (usft) (usft) (usft) I`maraft) (') (usft) (usft) 10,800.00 92.74 252.98 6,316.30 3,678.24 2,967.38 -730.71 7.00 60.00 6,010,966.57 511,019.55 10,900.00 96.20 259.08 6,308.49 3,654.18 2,870.70 -659.01 7.00 60.10 6,010,942.41 510,922.91 17 11,000.00 98.55 265.73 6,295.64 3,641.06 2,772.46 -580.49 7.00 70.00 6,010,929.19 510,824.69 11,100.00 100.78 272.46 6,278.83 3,639.49 2,673.96 -495.98 7.00 70.86 6,010,927.51 510,726.21 18 11,200.00 96.24 277.85 6,264.01 3,648.40 2,575.53 -406.28 7.00 130.00 6,010,936.31 510,627.77 11,250.00 93.95 280.50 6,259.57 3,656.34 2,526.38 -359.74 7.00 130.80 6,010,944.20 510,578.61 19 11,300.00 93.94 277.00 6,256.13 3,663.93 2,477.08 -313.25 7.00 -90.00 6,010,951.73 510,529.32 11,400.00 93.89 269.98 6,249.29 3,669.99 2,377.56 -224.03 7.00 -90.24 6,010,957.69 510,429.80 11,500.00 93.77 262.97 6,242.61 3,663.86 2,278.04 -140.91 7.00 -90.72 6,010,951.45 510,330.29 20 11,600.00 93.01 255.99 6,236.69 3,645.64 2,179.95 65.07 7.00 -96.00 6,010,933.13 510,232.24 11,700.00 92.21 249.03 6,232.13 3,615.64 2,084.73 2.39 7.00 -96.41 6,010,903.03 510,137.06 21 11,800.00 92.19 256.04 6,228.28 3,585.67 1,989.47 69.90 7.00 90.00 6,010,872.96 510,041.84 11,900.00 92.14 263.04 6,224.50 . 3,567.54 1,891.27 145.89 7.00 90.27 6,010,854.73 509,943.66 Planned TD at 11900.00 7/192018 12.51:38PM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips BAT ConocoPhillips Planning Report UGHES a GEm,r,r, Database: EDT Alaska Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupanik River Unit Site: Kupawk 31 Pad Well: 31-01 Wellbore: 31-01 L1 Design: 31-011-1_wP02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 31-01 Mean Sea Level 31-01 @ 71.00usft (31-01) True Minimum Curvature Targets Target Name -hiVnniss target Dip Angle Dip Dir. TVD +N/ -S +EI -W Northing Easting -Shape (I V) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 31-01 Ll T07 0.00 0.00 6,307,00 2,268.091,143,365.93 6,010,788.00 1,651,305.00 70' 11' 58.519 N 140'41'22.150 W - plan misses target center by 1138731.49usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) 6,010,447.00 - Point - plan misses target center by 1139904.02usft at 9000.00usft MD (6289.79 TVD, 3545.80 31-0l L1 Fauft4 0.00 0.00 6,306.00 2,170.491,142,991.78 6,010,690.00 1,650,931.00 70° 11' 58.128 N 140° 41'33.291 W - plan misses target center by 1138357.46usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Polygon Point 1 6,306.00 0.00 0.00 6,010,690.00 1,650,931.00 Point 6,306.00 1.00 1.00 6,010,691.00 1,650,932.00 31-0l L1_Fault2_M 0.00 0.00 0.00 2,347.391,144,024.08 6,010,868.00 1,651,963.00 70° 11'58.310 N 140'41'2.957 W - plan misses target center by 1139406.91 usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) 1,652,460.00 - Rectangle (sides W1.00 117,000.00 D0.00) 0.00 31-01 CTD Polygon Nortl 0.00 0.00 0.00 1,925.811,144,520.67 6,010,447.00 1,652,460.00 70° 11'53.479 N 140' 40'50.588 W - plan misses target center by 1139904.02usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Polygon - Polygon Point 1 0.00 Point 1 0.00 0.00 0.00 6,010,447.00 1,652,460.00 Point 0.00 934.28 -183.06 6,011,380.99 1,652,275.95 Point 0.00 1,493.14 8.54 6,011,940.00 1,652,466.93 Point 0.00 3,219.29 34.31 6,013,666.00 1,652,490.83 Point 0.00 3,030.77 517.17 6,013,478.02 1,652,973.85 Point 0.00 1,541.74 407.63 6,011,989.03 1,652,865.92 Point 0.00 759.88 195.80 6,011,207.02 1,652,654.96 Point 0.00 96.56 438.14 6,010,544.02 1,652,897.99 Point 0.00 -181.13 107.82 6,010,266.00 1,652,568.00 Point 10 0.00 0.00 0.00 6,010,447.00 1,652,460.00 31-01 CTD Polygon Nom 0.00 0.00 0.00 1,758.681,144,621.50 6,010,280.00 1,652,561.00 70° 11' 51.707 N 140° 40' 46.435 W - plan misses target center by 1140005.10usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Polygon - Point Point 1 0.00 0.00 0.00 6,010,280.00 1,652,561.00 Point 0.00 124.72 281.16 6,010,405.01 1,652,642.00 Point 0.00 451.71 326.50 6,010,732.02 1,652,886.98 Point 0.00 799.27 -180.20 6,011,079.00 1,652,379.96 Point 0.00 595.76 -1,655.55 6,010,873.91 1,650,904.97 Point 0.00 1,672.96 -2,710.55 6,011,949.86 1,649,848.92 Point 0.00 1,106.98 -2,787.14 6,011,383.86 1,649,772.94 Point 0.00 224.03 -1,954.97 6,010,501.90 1,650,605.98 Point 0.00 417.38 -329.60 6,010,696.98 1,652,230.98 Point 10 0.00 295.07 -34.70 6,010,575.00 1,652,525.98 Point 11 0.00 0.00 0.00 6,010,280.00 1,652,561.00 31-01L1-03_FaukS 0.00 0.00 6,246.00 21665.881,144,525.47 6,011,187.00 1,652,464.00 70° 12'0.656 N 140° 40'47.202 W - plan misses target center by 1139890.66usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Polygon Point 1 6,246.00 0.00 0.00 6,011,187.00 1,652,464.00 Point 6,246.00 1.00 1.00 6,011,188.00 1,652,465.00 31-0lL1_TOl 0.00 0.00 6,282.00 1,921.681,144,636.68 6,010,443.00 1,652,576.00 70° 11'53.267 N 140' 40'47.285 W - plan misses target center by 1140002.68usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-0lLl-03_Fault5_M 0.00 0.00 0.00 2,665.881,144,525.47 6,011,187.00 1,652,464.00 70°12'0.656N 140°40'47.202W - plan misses target center by 1139908.01 usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Rectangle (sides W1.00 111,000.00 00.00) 31-01 L1_T02 0.00 0.00 6,308.00 1,952.611,144,709.72 6,010,474.00 1,652,649.00 70° 11' 53.458 N 140'40'45.058 W - plan misses target center by 1140075.68usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-01 L1 Fauft3 M 0.00 0.00 0.00 2,283.991,143,457.95 6,010,804.00 1,651,397.00 70° 11'58.537 N 140° 41' 19.445 W 7119/2018 12.51:38PM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips BA ER ConocoPhillips Planning Report BAT a GEcorrpany Database: EDT Alaska Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kuparuk 31 Pad Well: 31-01 Wellbore: 31-0lLl Design: 31-01L1 Wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 31-01 Mean Sea Level 31-01 Q 71.00usft (31-01) True Minimum Curvature - plan misses target center by 1138840.87usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) 1,652,056.00 70'11'58.278N 140`41'0.245W - Rectangle (sides W1.00 H1, 000.00 DO.00) - Point 31-0lL1_Fault3 0.00 0.00 6,299.00 2,283.991,143,457.95 6,010,804.00 1,651,397.00 70° 11'58.537 N 140° 41' 19.445 W 31-01 CTD Polygon Wes 0.00 0.00 0.00 1,758.681,144,621.50 6,010,280.00 1,652,561.00 70° 11' 51.707 N 140° 40'48.435 W - plan misses target center by 1140005.10usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) 31-01 1-7_TOS 0.00 0.00 6,318.00 2,224.281,143,190.86 6,010,744.00 - Polygon - plan misses target center by 1138556.47usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-0111 T09 0.00 0.00 6,306.00 2,170.491,142,991.78 6,010,690.00 Point 0.00 0.00 0.00 6,010,280.00 1,652,561.00 Point 0.00 124.72 281.16 6,010,405.01 1,652,842.00 Point 0.00 451.71 326.50 6,010,732.02 1,652,886.98 Point 0.00 799.27 -180.20 6,011,079.00 1,652,379.96 Point 0.00 523.82 -2,687.73 6,010,800.87 1,649,872.97 Point 0.00 138.79 -2,702.13 6,010,415.86 1,649,858.99 Point 0.00 417.37 -319.60 6,010,696.98 1,652,240.98 Point 0.00 299.07 -34.70 6,010,579.00 1,652,525.98 Point 0.00 0.00 0.00 6,010,280.00 1,652,561.00 31-0lL1_304 0.00 0.00 6,288.00 2,358.29 1,144,117.10 6,010,879.00 1,652,056.00 70'11'58.278N 140`41'0.245W - plan misses target center by 1139482.56usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-0lL1_Fault3 0.00 0.00 6,299.00 2,283.991,143,457.95 6,010,804.00 1,651,397.00 70° 11'58.537 N 140° 41' 19.445 W - plan misses target center by 1138823.50usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Polygon Point 6,299.00 0.00 0.00 6,010,804.00 1,651,397.00 Point 6,299.00 1.00 1.00 6,010,805.00 1,651,398.00 31-0111T12 0.00 0.00 6,225.00 2,087.511,142,036.60 6,010,606.00 1,649,976.00 70° 11'58.741 N 140° 42'1.005 W - plan misses target center by 1137402.38usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-01 L1_Fault2 0.00 0.00 6,288.00 2,347.391,144,024.08 6,010,868.00 1,651,963.00 70° 11' 58.310 N 140° 41'2.957 W - plan misses target center by 1139389.55usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) -Polygon Point 1 6,288.00 0.00 0.00 6,010,868.00 1,651,963.00 Point 6,288.00 1.00 1.00 6,010,869.00 1,651,964.00 31-01 1-7_TOS 0.00 0.00 6,318.00 2,224.281,143,190.86 6,010,744.00 1,651,130.00 70°11'58.354N 140'41'27.355W - plan misses target center by 1138556.47usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-0111 T09 0.00 0.00 6,306.00 2,170.491,142,991.78 6,010,690.00 1,650,931.00 70° 11' 58.128 N 140° 41' 33.291 W - plan misses target center by 1138357.46usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-011-1T03 0.00 0.00 6,287.00 2,091.551,144,777.88 6,010,613.00 1,652,717.00 70° 11'54.705 N 140" 40'42.497 W - plan misses target center by 1140143.65usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-01 L7_T11 0.00 0.00 6,279.00 2,159.671,142,821.76 6,010,679.00 1,650,761.00 70' 11'58.276 N 140° 41'38.207 W - plan misses target center by 1138187.44usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-OIL1_Fault4_M 0.00 0.00 0.00 2,170.491,142,991.78 6,010,690.00 1,650,931.00 70°11'58.128N 140°41'33.291W - plan misses target center by 1138374.84usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Rectangle (sides W1.00 H1,000.00 DO.00) 31-0l L1 TlO 0.00 0.00 6,301.00 2,165.521,142,956.78 6,010,685.00 1,650,896.00 70° 11'58A32 N 140° 41'34.315 W - plan misses target center by 1138322.46usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-01 L1_T05 0.00 0.00 6,282.00 2,348.391,144,025.08 6,010,869.00 1,651,964.00 70° 11'58.319 N 140'41'2.924 W - plan misses target center by 1139390.55usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 31-OILl T06 0.00 0.00 6,299.00 2,283.991,143,457.95 6,010,804.00 1,651,397.00 70" 11' 58.537 N 140° 41' 19.445 W - plan misses target center by 1138823.50usft at 9000.00usft MD (6289.79 TVD, 3545.80 N, 4635.16 E) - Point 7/19/2018 12:51.38PM Page 7 COMPASS 5000.14 Build 85 ConocoPhillips BATER ConocoPhillips Planning Report UGHES aGEcompany Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well 31-01 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kupamk River Unit MD Reference: 31-01 Q 71.00usft (31-01) Site: Kupamk 31 Pad North Reference: True Well: 31-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-01 L1 4,439.47 TIP Design: 31-01L1 wp02 3,396.74 4,459.85 [Casing Points 8,755.00 6,269.79 3,399.02 4,477.39 Measured Vertical 8,873.97 Casing Hole 3,440.83 Depth Depth 4 Diameter Diameter 6,291.15 (usft) (usft) Name (in) (in) 9,110.44 11,900.00 6,224.50 23/8" 3,642.79 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth -N/-S +EI -W (usft) (usft) (usft) (usft) Comment 8,700.00 623021 3,394.68 4,439.47 TIP 8,730.00 6,252.13 3,396.74 4,459.85 KOP 8,755.00 6,269.79 3,399.02 4,477.39 End 18 dis, Start 45 dis 8,873.97 6,306.86 3,440.83 4,577.55 4 8,990.44 6,291.15 3,536.35 4,634.78 5 9,110.44 6,281.52 3,642.79 4,590.70 End 45, Start 7 dis 9,410.44 6,280.87 3,793.66 4,333.34 7 9,760.00 6,281.44 3,839.81 3,989.52 8 9,845.00 6,285.71 3,830.83 3,905.14 9 9,950.00 6,291.36 3,822.15 3,800.72 10 10,125.00 6,293.52 3,797.62 3,627.80 11 10,325.00 6,296.77 3,772.61 3,429.90 12 10,425.00 6,298.79 3,766.16 3,330.19 13 10,550.00 6,309.09 3,745.14 3,207.52 14 10,650.00 6,317.55 3,722.95 3,110.45 15 10,750.00 6,317.92 3,694.13 3,014.76 16 10,900.00 6,308.49 3,654.18 2,870.70 17 11,100.00 6,278.83 3,639.49 2,673.96 18 11,250.00 6,259.57 3,656.34 2,526.38 19 11,500.00 6,242.61 3,663.86 2,278.04 20 11,700.00 6,232.13 3,615.64 2,084.73 21 11,900.00 6,224.50 3,567.54 1,891.27 Planned TO at 11900.00 7/19/2018 12.51: 38PM Page 8 COMPASS 5000.14 Build 85 �- Baker HughesINTEQER ConocoPhillips Travelling Cylinder Report UGHES a GEcompany Company: ConocoPhillips(Alaska) Inc.-Kup2 Project: Kupamk River Unit Reference Site: Kuparuk 31 Pad Site Error: 0.00 usft Reference Well: 31-01 Well Error: 0.00 Usti Reference Wellbore 31-01 L1 Reference Design: 31-01 L1_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 31-01 31-01 @ 71.00usft (31-01) 31-01 @ 71.00usft (31-01) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum Reference 31-01 L1_wp02 =filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To nterpolation Method: MD Interval 25.00usft Error Model: ISCWSA 3epth Range: 8,700.00 to 11,900.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,382.90 usft Error Surface: Pedal Curve Survey Tool Program Date 7/18/2018 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 8,700.00 31-01 (31-01) GCT -MS Schlumberger GCT multishot 8700.00 11,900.00 31-GIL1_wp02(31-01LI) MWD MWD - Standard Casing Points Site Name Depth Depth Measured Vertical (usft) Casing Hole Depth Depth (usft) Diameter Diameter (usff) (usft) (usft) Name VeKpal Kupamk 31 Pad 11,900.00 6,295.50 2 3/8" looks. ♦ 2-3/8 3 Summary Kuparuk 31 Pad -31-01-31-01-31-01 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usff) vert..] (usft) VeKpal Kupamk 31 Pad Maet looks. ♦ Offset Wellbore centre casing- Cone 31-01-31-01-31-01 10,139.12 7,650.00 1,035.14 28.72 1,016.00 Pass - Major Risk 31-01-31-011-1-01-31-01 Li-07_wp02 10,951.04 10,950.00 54.96 1.33 54.63 Pass - Minor 1/10 31-01-31-01 Li -02-31-01 Li-02_wp01 10,440.57 10,475.00 29.12 1.39 28.89 Pass - Minor 1/10 31-01-31-01 Li -03-31-01 Li-03_wp02 9,391.85 9,475.00 188.59 1.46 187.65 Pass - Minor 1/10 31-01-31-01 Li-04-31-01Ll-04_wp0l 9,391.85 9,475.00 188.59 1.46 187.65 Pass - Minor 1/10 31-01-31-011-1-05-31-011-1-05_wp01 9,393.13 9,475.00 188.33 1.42 187.42 Pass-Minorl/10 31-02 - 31-02 - 31-02 8750.00 6,337.74 0.10 033 -12636 Out of range 31-04 - 31-04 - 31-04 3 063 227 -1.54 FAIL - Major Risk 8.774.35 Out of range Offset Design Kuparuk 31 Pad -31-01-31-01-31-01 most Sim ErrM,GDO mon survey Program: 100.GCT-MS Rues Assigned: Major Risk Meet Well Error: 0,00 usit Reverence Onset semi MajorAaw Measured vert..] Measured VeKpal Reference Maet looks. ♦ Offset Wellbore centre casing- Cone No Go Allowebw Wemire Depth Dolor Depth DepM Azimuth aNi +Elie How Size centro Dwtence Deviation Naft) (usa) (usft) Ivan? (men) fvm) (11 imam (man (11 (usa) (usa) Ivan) 8,72500 6,31948 8,72500 6,310.48 609 0.17 42662 3,39639 4456.45 3 000 1.17 -1.04 FAIL - Ma, Risk 8.749.97 6,337.34 8750.00 6,337.74 0.10 033 -12636 339813 447344 3 063 227 -1.54 FAIL - Major Risk 8.774.35 6,353.00 0.775.00 6,355.90 0.11 0.50 -129.34 3,399.88 4,49045 3 403 4.11 -0.01 FAIL - Major Risk 8,796.75 6,38444 0,800.00 8,374.21 0.11 0.66 -132.35 3,401.66 4.507.47 3 11.83 5.92 5.99 Pass -Major Risk 8,816.25 6,37179 8,895.40 8,39243 0.12 call -134.92 3,40345 4,524.49 3 23.42 7.40 16.12 Pass - Major Risk 8.832.62 8,375.95 0.850.00 6,410.68 0.13 0.99 -137.19 3.405.23 4,541.48 3 38.02 9.56 29.61 Pass - Major Risk 0,846.15 6.373.94 8,875.00 8,428.94 0.13 1.16 -139.19 3,407A0 4.558.46 3 54.91 9.48 45.67 Pass - Major Risk 8,81 6.378.59 8.900.40 6."7.23 0.14 1.32 -140.96 3,408.76 4,575.42 3 73.53 10.15 63.67 Pass - Major Risk 8.886.42 6,378.44 8.925.00 6,465.52 0.15 149 -142.52 3.410.52 4,592,37 3 93.41 10.70 83.11 Pass - Major Risk 8,873.07 6,377.96 8,950.00 6,403.81 0.15 1,66 -143.88 3,412.27 4,609.32 3 11025 11.19 103.82 Pass - Major Risk 8,892.94 6.376.89 8,975.00 6.502.11 0.16 1.82 -148.55 3,414A3 4,626.27 3 135.69 11,84 124.78 Pass -Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 7/182018 2:09:17PM Page 2 COMPASS 5000.14 Build 85 lugUlI1 UM) l+)4u�N/l')411Ioy 0 a 0 0 3 l m Q 0 a o O r Oa; @ dC C O�NMQVImrm01NN� ymmMmmM1mN Mlnmr�nM Yi 01"m0+�01 Of yt-1 OfOmmNO1�NQ010WN(YM1OOM1OIMm (AM1�ml7N@YI Y](O OON< q �[10OtVh comm�ngMP N Z >Pm�QQulmMmmQ @ N N N N N N ■■■■■■■ ■■■■ N U 0 0 0 0 0 0 0 0 0 0 MIN J� O M O O O O O O O O 0 0 IyO�00mO00f000tVONO000O00Q0 N p 0 0 0 0 0 0 0 0 0 0 N o M O O O O O O O O o O O O O O O O O O O o r .1. ■mmm■■■■■■m■m fi n. O) N m O Q N Q N O O W N ht0 O m m Q M n QmM �n 9gM--r m m.-vaQnn a.honN Qs �@qua �1�aO00inOmN00m GQ p NCimm�mP[`M'iN QQ@QmP@f0�1MMMMMMMMNNNNN'- ME Wm (n m Q N M 1t)0.� M10 10Mmf Q W � I aonomM1% 10 mm�-moo .-mow.-.-@Mm�o v> 1p �QtOO Oi C1G tV C'l pa OONrN.VIN@aOfmMNr O>q 01Q MP01M MN0n.QN01mMN.�m � Mammal aM')nM2 nM9. �n,1m���nnnnm....mv1 M M M M M M M M M M M M J J W DO MOf mm N M1O� m N r kf 01 m c O MLq L9 �3NrM1m.mQra-2 v1M1M1minm@mV]m�m Ol0 CL6 pON05 (p a-O�-'lO�Mmm0lM1rmm01NNQ �MNmOfmmmmmOf 0f 010 ��OM1hQMN !E vl ��a`�o maammmmm�mmmm�ilc a"lommmmm c1, ON nm�-mmm m�-M 10000)@NbmmOnMQ m m P Q O m m M1 M1 m O1 O Q N A O O O (D QQ�M1QOW.tV 0�1 O1 (V�m0101NON0)t+l .mmol a MNNNNNNNNNNNNNNNN UOO....0......ONO N mr Oml rNp OP�QOOi �O O0Mi : o Q.............. lOMim O) WO p Oo 00 0o ....... OIPQ v,000000000000000 gAln']m r01O0�@ONNOhN� (OV�ON mmmm 0m 001. 0/01000000 z O ��NM@aOmrmOIO�N'Q^[DomO)NNN Zo y 2 ZI1 I110 -I to s III Ill. -It J -01 176-F Ol 110-1 t _. __. e ........ -I - Sam, f LL1 - _ mj� _.. LL 1 1 ,01:-] 10 -IE ... ........... -1 ¢1 -I 1 -1 -1 -1 Y 2 6 .... ..... N 'v .._...... _a:.._. __31- ILI T I E01110 -if 3i ILI_02 y -2 2 Emmommim mff WON ,1 /■■■■r i JJ�� 221911mm I■■■■fi■■■wffiim■I ■■■■■■■■■■■■■ ■l , ■■■■■■■■■■■■■ ■l... lugUlI1 UM) l+)4u�N/l')411Ioy 0 a 0 0 3 l r m Q 0 a o O r Oa; @ dC C O�NMQVImrm01NN� ymmMmmM1mN Mlnmr�nM Yi 01"m0+�01 Of yt-1 OfOmmNO1�NQ010WN(YM1OOM1OIMm (AM1�ml7N@YI Y](O OON< q �[10OtVh comm�ngMP N Z >Pm�QQulmMmmQ @ N N N N N N N U 0 0 0 0 0 0 0 0 0 0 J� O M O O O O O O O O 0 0 IyO�00mO00f000tVONO000O00Q0 N p 0 0 0 0 0 0 0 0 0 0 N o M O O O O O O O O o O O O O O O O O O O o r 000. Q.'Ai�nrnM1rrrnnM1M1M1rnnM1 fi n. O) N m O Q N Q N O O W N ht0 O m m Q M n QmM �n 9gM--r m m.-vaQnn a.honN Qs �@qua �1�aO00inOmN00m GQ p NCimm�mP[`M'iN QQ@QmP@f0�1MMMMMMMMNNNNN'- J Wm (n m Q N M 1t)0.� M10 10Mmf Q W � I aonomM1% 10 mm�-moo .-mow.-.-@Mm�o v> 1p �QtOO Oi C1G tV C'l pa OONrN.VIN@aOfmMNr O>q 01Q MP01M MN0n.QN01mMN.�m � Mammal aM')nM2 nM9. �n,1m���nnnnm....mv1 M M M M M M M M M M M M J J W DO MOf mm N M1O� m N r kf 01 m c O MLq L9 �3NrM1m.mQra-2 v1M1M1minm@mV]m�m Ol0 CL6 pON05 (p a-O�-'lO�Mmm0lM1rmm01NNQ �MNmOfmmmmmOf 0f 010 ��OM1hQMN !E vl ��a`�o maammmmm�mmmm�ilc a"lommmmm c1, ON nm�-mmm m�-M 10000)@NbmmOnMQ m m P Q O m m M1 M1 m O1 O Q N A O O O (D QQ�M1QOW.tV 0�1 O1 (V�m0101NON0)t+l .mmol a MNNNNNNNNNNNNNNNN UOO....0......ONO N mr Oml rNp OP�QOOi �O O0Mi : o Q.............. lOMim O) WO p Oo 00 0o ....... OIPQ v,000000000000000 gAln']m r01O0�@ONNOhN� (OV�ON mmmm 0m 001. 0/01000000 z O ��NM@aOmrmOIO�N'Q^[DomO)NNN Zo y r d (uplisn 58) q;da(l jeagaap anal 50 55 30 )5 10 IS 10 i5 10 5 70 55 40 25 10 v1 95 0 0 BO O O 55 M ro 50 p U I$ � 320 U IDS 190 125 160 445 530 515 ?Do 185 110 )55 )G0 125 110 195 I80 f 4 � E SIG c1, a i 2 ZI1 I110 -I to s III Ill. -It J -01 176-F Ol 110-1 t _. __. e ........ -I - Sam, f LL1 - _ mj� _.. LL 1 1 ,01:-] 10 -IE ... ........... -1 ¢1 -I 1 -1 -1 -1 Y 2 6 .... ..... N 'v .._...... _a:.._. __31- ILI T I E01110 -if 3i ILI_02 y -2 2 d (uplisn 58) q;da(l jeagaap anal 50 55 30 )5 10 IS 10 i5 10 5 70 55 40 25 10 v1 95 0 0 BO O O 55 M ro 50 p U I$ � 320 U IDS 190 125 160 445 530 515 ?Do 185 110 )55 )G0 125 110 195 I80 HE = s m e lr c 0 3 1 o m c 4 z _ o v :o ±� ^ m IINI v fN 1 v 31-01 RWO Final Schematic 16" 62# H-40 shoe @ 104' MD 9-5/8" 36# J-55 shoe @ 4346' MD A2 -sand perfs 8734'- 8760' MD Al -sand perfs 8770'- 8798' MD 7" 26# J-55 shoe @ 9010' MD Updated: 19 -Jul -2018 RLP 3-1/2" Camco MMG gas lift mandrels @ 3130' RKB Baker Orbit Valve @ 3597' RKB 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels @ 4930,6251', 7272', 8003' & 8465' RKB Baker Locator @ 8518' RKB Baker PBR 80-40 @ 8522' RKB (2.99" ID) Baker FHL Packer @ 8535' RKB (2.91" ID) 3-1/2" X landing nipple at 8588' RKB (2.813" min ID) Northern Solutions WEDGE (see details) Top of Wedge Assembly @ 8698' RKB 3-'/" X landing nipple at 8712' RKB (2.813" min ID) Top of Wedge Assembly @ 8728' RKB 3-%" X landing nipple at 8742' RKB (2.813" min ID) Baker WLEG @ 8747' RKB Northern Solutions Wedge * 3-1/2" 9.3# L-80 Base Pipe * 5.905" OD (12.9' long) -50' Total Length 0.625" Bore thru Upper Tray * 1.125" Bore thru Lower Section HES 2.81" X Nipple below u] m 0 oEg R f SN$ 93 o 00 0 O m E < t o C .r a m N N r Q m E E E F j V _ ❑ m y(Lm Opm 42 (.9 OE �m ❑ � m m ��m N W TN TN tNrl Fm 3a a m � W 7 m� y E y E d n C� U' t0 y C 001 E W 5.9 V (D -Xd N W U ❑ 01 Um JdLL �'3 3 N Y N N W W W X taX oX N Am W A AAn N N W o 6] tt1 m A c%f 0 0 A 2 F r1 O F M N ¢] PIAM Al 09 0 oFo 3$0 ;os_om Q8� - w om�m o� Qoa 0 oEg R f SN$ 93 jezklil 0 0 0 O m E t o C .r a m N N r Q m � F TRANSMITTAL LETTER CHECKLIST WELL NAME: /���f -�—L — L -)/"l' / PTD: lv-0B /Development Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: C.�C/�� POOL:n" 4 �/i�✓ (�/ l / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permitt isfor new wellbore segment of existing well Permit j LATERAL 2� �a No. �6'� <, �, API No. 50 -UL / % � j�Z• (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 PTD#:2180870 Initial Well Name: KUPARUK RIV UNIT 31-01Ll Program DEV Well bore seg ❑d :ND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31,05,03U0.1.A),g.Z.A-u1 ... . . . ...... . . . .. . . rvn. Surface casing set to KRU 3141_ 1 Permit fee attached _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ ___ No _ Surface casing set and fully cemented 2 Lease number appropriate _ _ _ _ _ ___ _ _ ___ _ _ _ Yes Entire well within ADL0025521 3 Unique well name and number _ _ - - - - - - - - ---- - - - - - ------ - Yes _ Productive. interval will be completed with. uncemented slotted liner 4 Well located in defined pool _ . . . ... . . ....... . . . Yes KUPARUK RIVER,. KUPARUK RIV OIL- 49010P.... 5 Well located proper distance from drilling unit boundary _ _ _ _ _ _ ... Yes Kuparuk River Oil Pool governed by Conservation Order No. 432D 6 Well located proper distance from other wells _ _ _ _ Yes Conservation Order No. 432D has no interwell. spacing. restrictions. Wellbore will be more than 500' _ 7 Sufficient acreage available indrillingunit. _ _ _ Yes - from an external property line. where ownership or landownership. changes. As proposed, well will _ 8 If deviated, is wellbore plat. included _ _ Yes conform to. spacing requirements. 9 Operator only affected part' - - - Yes Max formation pressure is 5456 psig(16.7 ppg. EMW); will drill w/ 8.6. ppg EMW and maintain overbal w/ MPD Appr Date VTL 8/28/2018 10 Operator hasappropriate bond in force _ _ _ Yes Appr Date 11 Permit can be issued without conservation order _ Yes _ MPSP is 4829 psig; will test BOPsto 4900.psig 12 Remit can be issued without administrative approval _ _ _ - _ _ _ Yes . . . . ..... .... . . SFD 7/24/2018 13 Can permit be approved before 15 -day wait _ _ Yes 14 Well located within area and strata authorized by Injection Order # (put 10# incomments)(For; NA _ _ Yes H2S measures required.. 15 All wells. within 1/4 mile.area of review identified (For service well only). .. _ ... NA NA 16 Pre -produced injector; duration of pre production less than 3 months (For service well only) NA No 31 -Pad wells are 1 -128 -bearing, H2S measures are required....... 18 Conductor string. provided _ .... _ _ _ .. _ _ _ NA _ _ . Conductor set-in KRU 31-01_ ...... Engineering 19 Surface casing. protects all -known USDWs _ _ _ _ _ NA. _ Surface casing set to KRU 3141_ 20 CMT. vol adequate to circulate. on conductor & surf esg _ _ _ NA _ Surface casing set and fully cemented 21 CMT. vol adequate to tie-in long string to surf csg. _ _ NA - - - - - - - - - - - - - - - - - 22 CMT. will cover all knownproductivehorizons .. _ _ _ No.. _ Productive. interval will be completed with. uncemented slotted liner 23 Casing designs adequate for C,. T. B & permafrost Yes 24 Adequate tankage or reserve pit _ _ _ _ _ _ Yes Rig has steel tanks; all waste. to approved disposal wells - 25 If a, re -drill, has.a 10-403 for abandonment been approved _ _ _ NA - - - - - - - - - - - - - - - - - 26 Adequate wellbore separation proposed.... _ _ _ _ Yes _ Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations _ _ _ _ _ _ NA 28 Drilling fluidprogram schematic & equip list adequate. Yes _ Max formation pressure is 5456 psig(16.7 ppg. EMW); will drill w/ 8.6. ppg EMW and maintain overbal w/ MPD Appr Date VTL 8/28/2018 29 BOPE$,.do they meet regulation - _ _ _ _ _ Yes 30 BOPE.press rating appropriate; test to(putpsig in comments). Yes _ MPSP is 4829 psig; will test BOPsto 4900.psig 31 Choke manifold complies w/API RP -53 (May 84). _ _ _ _ _ _ _ Yes 32 Work will occur without operation shutdown- - _ _ ... _ Yes 33 Is presence of H2$ gas probable _ _ _ - _ _ _ Yes H2S measures required.. 34 Mechanical. condition of wells within AOR verified (For service well only) ...... NA 35 Permit can be issued w/q hydrogen. sulfide measures _ _ _ No 31 -Pad wells are 1 -128 -bearing, H2S measures are required....... Geology 36 Data. presented on potential overpressure zones ..... _ _ _ - Yes Expected reservoirpressure is -12.1 ppg EMW, with a -maximum up to 716.7 ppg-EMW.. 37 Seismic analysis of shallow gas zones. _ _ _ _ _ _ NA Well will be drilled using 8,6 ppg mud, a co--fled-tubing rig, and managed. pressure drilling Appr Date Seabed condition survey.(if off -shore) . . . .. . . . ..... . . ... .. NA technique tocontrolformation pressures and stabilize shale sections. NOTE; Chance of SFD 7/24/2018 I38 39 - Contact name/phone for weekly progress reports. [exploratory only) - NA encountering gas while drilling this wellbore due to gas. injection performedin this area. Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date