Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout218-089DATA SUBMITTAL COMPLIANCE REPORT
1/18/2019
Permit to Drill 2180890 Well Name/No. KUPARUK RIV UNIT 31-OILI.02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-21514-62-00
MD 11400 TVD 6347 Completion Date 10/14/2018 Completion Status 1 -OIL Current Status 1 -OIL UIC No
REQUIRED INFORMATION /
Mud Log No ✓ Samples No ✓ Directional Survey Yes (/
DATA INFORMATION
List of Logs Obtained: GR/Res
Well Log Information:
Log/ Electr
Data Digital Dataset
Type Med/Frmt Number Name
ED C 29951 Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED C 29951 Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
ED
C
29951
Digital Data
(from Master Well Data/Logs)
Log Log Run Interval OH I
Scale Media No Start Stop CH Received
Comments
8366 11400 11/2/2018
Electronic Data Set, Filename: 31-01L7-02
GAMMA RES.Ias .
11/2/2018
Electronic File: 31-0lL1-02 21VID Final Log.cgm
11/2/2018
Electronic File: 31-0lLl-02 51VID Final Log.cgm
11/2/2018
Electronic File: 31-OIL1-02 5TVDSS Final
Log.cgm
11/2/2018
Electronic File: 31-011-1-02 21VID Final.pdf
11/2/2018
Electronic File: 31-0l L1-02 51VID Final.pdf
11/2/2018
Electronic File: 31-01L1-02 5TVDSS Final.pdf
11/2/2018
Electronic File: 31-0l Ll -02 EOW-NAD27.pdf
11/2/2018
Electronic File: 31-01 L1-02 EOW - NAD27.txt
11/2/2018
Electronic File: 31-011-1-02 Final Surveys.csv
11/2/2018
Electronic File: 31-OlL1-02 Final Surveys.xlsx
11/2/2018
Electronic File: 31-011-1.02 Survey Listing.txt
11/2/2018
Electronic File: 31-011-1-02 Surveys.txt
11/2/2018
Electronic File: 31-011-1-
02_25_tapescan_BH I_CTK.txt
11/2/2018
Electronic File: 31-011-1-
02_5_tapescan_B H I_CTK.txt
11/2/2018
Electronic File: 31-011-1-02_output.tap
11/2/2018
Electronic File: 31-01L1-02 21VID Final Log.tif
11/2/2018
Electronic File: 31-01 L1-02 51VID Final Log.tif
AOGCC Page 1 of 3 Friday, January 18, 2019
DATA SUBMITTAL COMPLIANCE REPORT
1/18/2019
Permit to Drill 2180890 Well NamelNo. KUPARUK RIV UNIT 31-01Ll-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029.21514-62-00
MD
11400
TVD 6347 Completion Date 10/14/2018
Completion Status 1-0I1
Current Status 1 -OIL UIC No
ED
C
29951 Digital Data
11/2/2018
Electronic File: 31-01 L1-02 5TVDSS Final Log.tif
Log
C
29951 Log Header Scans
0 0
2180890 KUPARUK RIV UNIT 3I.01L1-02 LOG
HEADERS
ED
C
29975 Digital Data
11/7/2018
Electronic File: 31-OlLl-02 EOW - NAD27.pdf
ED
C
29975 Digital Data
11/7/2018
Electronic File: 31-OlLl-02 EOW - NAD27.txt
ED
C
29975 Digital Data
11/7/2018
Electronic File: 31-OlLl-02 EOW - NAD83.pdf
ED
C
29975 Digital Data
11/7/2018
Electronic File: 31-OlLl-02 EOW - NAD83.txt
Log
C
29975 Log Header Scans
0 0
2180890 KUPARUK RIV UNIT 31-OlLl-02 LOG
HEADERS
Well Cores/Samples
Information:
Sample
Interval
Set
Name
Start Stop
Sent Received
Number
Comments
INFORMATION RECEIVED
Completion Report V
Production Test Informatior Y� NA
Geologic Markers/Tops0
COMPLIANCE HISTORY
Completion Date: 10/14/2018
Release Date: 8/30/2018
Description
Comments:
Directional / Inclination Data V Mud Logs, Image Files, Digital Data Y /A Core Chips y/
Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files O Core Photographs Y /
Daily Operations Summary Cuttings Samples Y /QA Laboratory Analyses Y /
Date Comments
AOGCC Page 2 of 3 Friday, January 18, 2019
AOGCC Page 3 of 3 Friday, January 18, 2019
DATA SUBMITTAL COMPLIANCE
REPORT
1/18/2019
Permit to Drill 2180890
Well NamelNo. KUPARUK RIV UNIT 31-01L1-02 Operator CONOCOPHILLIPS ALASKA,
INC. API No. 50.029-21514-62-00
MD 11400 T
Compliance Reviewed
6347 omp tion D 10/14/2018 Completion Status 1-0I1-
Current Status
Date:
1-0I1 UIC No
% / 16 / i 9
AOGCC Page 3 of 3 Friday, January 18, 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
NOV 13 2018
WELL COMPLETION OR RECOMPLETION REPORT
AN
1 a. Well Status: Oil E] Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑
20AAC 25.105 20AAC 25.110
GINJ❑ WINJ❑ WAGE] WDSPL❑ No. of Completions:
1b. Well Class
Development Exploratory E]
Service E] Stratigraphic Test E]
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Abend.: 10/14/2018
14. Permit to Drill Number / Sundry:
218-089
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
10/11/2018
15. API Number:
50-029-21514-62-00
4a. Location of Well (Governmental Section):
Surface: 344' FSL, 179' FWL, Sec 31, T13N, RSE, UM
Top of Productive Interval:
1301' FNL, 365' FEL, Sec 31, T13N, R9E, UM
Total Depth:
1360' FNL, 2957' FWL, Sec 31, T13N, R9E, UM
8. Date TO Reached:
10113/2018
16. Well Name and Number:
KRU 31-01Ll-02
9. Ref Elevations: KB 71
GL: 40 BF:
17. Field / Pool(s):
Kupamk River FieldlKuparuk River Oil Pool
10. Plug Back Depth MD/TVD:
N/A
18. Property Designation:
ADL 25521
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 508056 y- 6007286 Zone- 4
TPI: x- 512771 y- 6010926 Zone- 4
Total Depth: x- 510830 y- 6010864 Zone- 4
11. Total Depth MD/TVD:
1140016347
19, DNR Approval Number:
LO/NS 83-130
12. SSSV Depth MD/TVD:
N/A
20. Thickness of Permafrost MD/TVD:
130011256
5. Directional or Inclination Survey: Yes E (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
NIA (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
9126/6345
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/Res
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
16 62.5 H-40 31 104 31 104 24 274 sx CS II
9518 36 J-55 31 4346 31 3305 121/4 1650 sx AS III, 320 sx Class G
7 26 J-55 24 9010 24 6528 81/2 300 sx Class G and 175 sx ASI
23/8 4.6 L-80 8668 11400 6278 6347 3 Slotted Liner
24. Open to production or injection? Yes E No ❑
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
SLOTTED LINER @: COMPLETIONS
DAJE
8669-11400 MD and 6278 - 6347 TVD... 10/13/2018 (9I (�� L$
VE`R�IF�I�ED
MU
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
31/2 8747 8535/6179
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes ❑ No E
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
10120/2018
Method of Operation (Flowing, gas lift, etc.):
FLOWING
Date of Test:
1012512018
Hours Tested:
18.8
Production for
Test Period
Oil -Bbl:
565.6
Gas -MCF:
441
Water -Bbl:
2178
Choke Size:
104
Gas -Oil Ratio:
780
Flow Tubing
Press. 179
Casino Press:
1272
Calculated
24 -Hour Rate
Oil -Bbl:
Gas -MCF:
563
Water -Bbl:
Oil Gravitv - API (corr):
21
Form 10-407 Revised 512017' y��Zl6 < �,, I(/C011pNUED ON PAGE 2 RBDMS �U n9V 1 3 2O1B Submit ORIGINIAL onl
�C /^ri{fpl /�J w75
28. CORE DATA Conventional Core(s): Yes ❑ No D Sidewall Cores: Yes ❑ No 0
If Yes, list formations and intervals cored (MDfrVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑�
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1300
1256
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
9126
6345
information, including reports, per 20 AAC 25.071.
Formation @ TPI -Kuparuk A2
TD
11400
6347
Formation at total depth:
I Ku aruk A3
31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
pateontolouical report. production or well test results. per 20 AAC 25,070
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: James Ohlin er Contact Name: Keith Herrin
Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herrin co .com
Authorized Contact Phone: 263-4321
Signature: Date: � 5
INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water-A@ernating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vhrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
31-01 Proposed CTD Schematic
16' 82611-40 ehD
o104'MD
9AI8' 366 J-55 shoe
0 4348' MD
TOWB®e6B6'MD
BI KOP (M am MD
Bike By FMM1
BM FMM1 8,xk M WIMow
AMBM pM
]aa•-e]6D•MD
.and ced
8]N-6]68' MD
IT- M.1 .nss ® 6010 MD
3-12' Cameo MMG gas lift mandrels an 3129 RKB
Baker Orbit Valve Q 3596' MD
3.12' 9.36 LA0 EUE BN Tubing to surface
3.12" Cameo MMG gas fill marMrels @ 4929'. 6250',
7271', 8002', a 8 '
Baker Lautor ® 8517 RKB
Baker PBR B0 D@8522'MD(3'ID)
Baker FHL Packer @ 8535' MD (4' ID)
3-M' X ISMing nipple at SUB'MD (2.813" min ID)
Top of Wedge Aseembiy Q 8698' RKB
3-M° X IaMirq nipple at 8712' MD (2.813' min ID)
Top of Wedge Assembly Q 0728' RKB
3-X•' X lerpling nipple at 8742' MD (2.813' min ID)
Baker WLEG @ 874T MO
3rywlW
W MD
iop W hM1-&MTMD
Baulml0-Ilppa uD
roi� �Mo�eoi�o 4:r..
S.ifY 4mM xn.. v] eLminum eha
1w1LsL3 ro-I—MD
is Inas Mo eoi- Ii. uopm
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
StsnTime
I End Time
Dw(hr)
Phase
Op Code
A Wtiy Code
Time P -T -X
Operation
(W)
End Depth (WB)
9/14/2018
9/14/2018
5.50
MIRU
MOVE
MOB
P
Pull off well, install jeeps, modules
0.0
0.0
12:00
17:30
lined up to head out.
9/14/2018
9114/2018
0.50
MIRU
MOVE
MOB
P
Made call to securtiy to start move,
0.0
0.0
17:30
18:00
informed that we won't start until last
bus @ 18:30, stand by
9/14/2018
9/14/2018
0.50
MIRU
MOVE
MOB
T
Stand by for busses
0.0
0.0
18:00
18:30
9/14/2018
9/14/2018
1.50
MIRU
MOVE
MOB
T
Made call to start moving rig, informed
0.0
0.0
18:30
20:00
that it was fire training on sweat pad
(1 C -access road), continue standing
by
9/14/2018
9/15/2018
4.00
MIRU
MOVE
MOB
P
Mobilize rig towards 31 -pad
0.0
0.0
20:00
00:00
9/15/2018
9/15/2018
2.00
MIRU
MOVE
MOB
P
Continue moving rig towards 31 -pad
0.0
0.0
00:00
02:00
9/15/2018
9/1512018
1.00
MIRU
MOVE
MOB
P
On 31 pad, Remove jeeps. Prep cellar
0.0
0.0
02:00
03:00
for spotting rig.
9/15/2018
9115/2018
6.00
MIRU
MOVE
MOB
P
Spot rig. Work rig up check list
0.0
0.0
03:00
09:00
9115/2018
9/15/2018
4.50
MIRU
WHDBOP
NUND
P
RIG ACCEPT 09:00. Nipple up BOPE,
0.0
0.0
09:00
13:30
Service rig, Prep for BOPE test,
trouble shoot swab two
9/15/2018
9115/2018
6.50
MIRU
WHDBOP
BOPE
P
Start full BOPE test, Test witnesed by
0.0
0.0
13:30
20:00
Brian Bixby AOGCC, Fail / Pass on
Swab 2, R-2 and B-7
9/15/2018
9/1512018
2.40
MIRU
WHDBOP
PRTS
P
Pressure test PDUs & TT line to 2000
0.0
0.0
20:00
22:24
PSI, Line up to fill CT
9/15/2018
9/16/2018
1.60
SLOT
WELLPR
CTOP
P
Start filling CT, Boot wire Perform
0.0
0.0
22:24
00:00
slack Mgmt. Surge CT 3 times to 3.5
BPM. Unstab and see wire 4 feel up
CT Stab back on and repeat.
9/16/2018
9/16/2018
0.70
SLOT
WELLPR
CTOP
P
Surge coil 3 more limes to 3.8 BPM.
0.0
0.0
00:00
00:42
did not hear wire move. Unstab. ut 5'
CT have wire. Test E -line 131 Ohmes
>2006Mohmes
9116/2018
9/16/2018
0.90
SLOT
WELLPR
CTOP
P
Prep coil. Install CTC, Pull test to 35K
0.0
0.0
00:42
01:36
9/16/2018
9/16/2018
0.60
SLOT
WELLPR
CTOP
P
Head up UQC, PT CTC and UQC to
0.0
0.0
01:36
02:12
4K
9/16/2018
9/16/2018
1.70
SLOT
WELLPR
PRTS
P
PT and chart inner reel valve / Iron.
0.0
0.0
02:12
03:54
R5 R6 and SRI needed to be serviced
9/16/2018
9/16/2018
0.50
SLOT
WELLPR
CIRC
P
Circ freshwater out of coil, Open SSV,
0.0
0.0
03:54
04:24
Open tangos. WHP=1240 PSI
9/1612018
9/16/2018
1.00
PRODI
WHPST
PULD
P
PJSM, PD BHA#1 window milling
0.0
74.3
04:24
05:24
BHA with 2.80 window mill, string
reamer, .6° AKO motor
9/16/2018
9/16/2018
1.10
PRODI
WHPST
PULD
P
Skid injector, change out packoffs,
74.3
74.3
05:24
06:30
install checks, lest MWD, tag up and
set depth
9116/2018
9/1612018
1.90
PRODI
WHPST
TRIP
P
RIH with window milling BHA#1
74.3
6,120.0
06:30
08:24
9/16/2018
9/16/2018
2.05
PRODI
WHPST
DLOG
P
Strip log HRZ and K1 (+6.5'
8,120.0
8,730.3
08:24
10:27
correction) down to lop of whipstock
@5 ft/min, swap hole over to 8.7ppg
Power -Pro solids free drilling mud
9/16/2018
9/16/2018
0.05
PROD1
WHPST
TRIP
P
Dry tag TOW @ 8730.3', wt check
8,730.3
8,730.3
10:27
10:30
38K, come online with pumps at 2
BPM,
9/16/2018
9/16/2018
0.50
PRODI
WHPST
DISP
P
Finish displacing well to 8.7 pps power
8,730.3
8,703.0
10:30
11:00
1
1
-pro SF drilling mud
9/16/2018
9116/2018
0.30
PRODI
WHPST
TRIP
P
RBIH. and re -tag TOW at 8729.43'
8,703.0
8,729.4
11:00
11:18
1
Page 1137 ReportPrinted: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Start Time
Ertl Time
Dur(hr)
phase
op COAs
AdWy Cade
Time P -T -X
opereu.O
(fll(3)
End Depth Most
9/16/2018
9/16/2018
8.70
PROD1
WHPST
WPST
P
OBM, 1.8 bpm, freespin = 4240 psi,
8,729.4
8,733.8
1118
20:00
diff --440 psi, BHP=4124 psi, IA=119
psi bled to 630 psi, OA=164 psi,
function test auto choke system at
12:15,
9116/2018
9/17/2018
4.00
PROD1
WHPST
WPST
P
8733.75, 1.79 BPM @ 4240 PSI FS,
8,733.8
8,735.2
20:00
00:00
BHP=4095
9/17/2018
9/17/2018
2.50
PROD1
WHPST
WPST
P
Continue milling window off NS
8,735.2
8,736.0
00:00
02:30
1
lWhipstock
9/17/2018
9/17/2018
1.30
PROD1
WHPST
WPST
P
Continue milling, 1.8 BPM @ 4240
8,736.0
8,736.7
02:30
03:48
PSI FS, BHP=4080
9/17/2018
9/17/2018
3.00
PROD1
WHPST
WPST
P
Call 7" exit. 1.8 BPM @ 4240 PSI FS,
8,736.7
8,754.4
03:48
06:48
BHP=4090
9/17/2018
9/17/2018
0.15
PROD1
WHPST
WPST
P
TD rathole, PUW 36 k
8,754.4
8,754.4
06:48
06:57
9/17/2018
9117/2018
1.40
PRODt
WHPST
REAM
P
Ream widow area as drilled TF, 300'
8,754.4
8,720.0
06:57
08:21
LOHS, 150' ROHS, and 180' of HS,
dry dirft clean
9/17/2018
9/17/2018
0.45
PROD1
WHPST
SIPB
P
PUH, obtain static pressure survey
8,720.0
8,632.0
08:21
08:48
above window, 12.0 ppg
9/17/2018
9117/2018
1.50
PROD1
WHPST
TRIP
P
POOH, following MP
8,632.0
74.2
08:48
10:18
9/17/2018
9/17/2018
1.00
PROD1
WHPST
PULD
P
At surface, tag up, space out, PUD
74.2
0.0
10:18
11:18
milling BHA
9/17/2018
9117/2018
0.25
PRODt
WHPST
PULD
P
LD tools
0.0
0.0
11:18
11:33
Note: Mills Gauged DSM - 2.79"
nogo, String Reamer - 2.80" nogo
9/17/2018
9/17/2018
0.35
PROD1
WHPST
CIRC
P
Flush surface lines and BOP stack
0.0
0.0
11:33
11:54
9/17/2018
9/17/2018
0.25
PROD1
DRILL
PULD
P
PU/MU build section BHA
0.0
0.0
11:54
12:09
9/17/2018
9/17/2018
0.75
PROD1
DRILL
PULD
P
PD build section BHA #2
0.0
72.2
12:09
12:54
9/17/2018
9/17/2018
0.25
PROD1
DRILL
PULD
P
MU UQC, surface test Coilrak tools
72.2
72.2
12:54
13:09
(good -test)
9/17/2018
9/17/2018
0.25
PROD?
DRILL
PULD
P
Stab INJH, check pac-offs, tag up,
72.2
72.2
13:09
13:24
reset depth counters
9/17/2018
9117/2018
1.40
PROD1
DRILL
TRIP
P
RIH
72.2
8,395.0
13:24
14:48
9/17/2018
9/17/2018
0.20
PROD1
DRILL
DLOG
P
Log the K1 marker correction of minus
8,395.0
8,419.0
14:48
15:00
19.5'
9/17/2018
9/17/2018
0.20
PROD1
DRILL
TRIP
P
Continue IH
8,419.0
8,754.4
15:00
15:12
9/17/2018
9/17/2018
1.10
PROD1
DRILL
DRLG
P
OBD, 175 bpm at 4,095 psi, Diff --640
8,754.4
8,845.3
15:12
16:18
psi, WHP=256, BHP=4,000, IA=626,
OA=164
9/17/2018
9/172018
0.20
PROD1
DRILL
TRIP
T
Unable to achieve build rate, PUH,
8,845.3
8,701.0
16:18
16:30
PUW 35 K, AVG DLS=34° vs plan 45°
9/17/2018
9/17/2018
1.00
PROD1
DRILL
TRIP
T
Open EDC, continue POOH
8,701.0
3,623.6
16:30
17:30
9/17/2018
9/17/2018
0.75
PROD1
DRILL
TRIP
T
Function closed Orbit valve, check
3,623.6
3,623.6
17:30
18:15
well for flow (no -flow) Crew change
9/17/2018
9/17/2018
0.75
PROD1
DRILL
TRIP
T
Continue POOH
3,623.6
72.2
18:15
19:00
9/17/2018
9/17/2018
0.25
PROD1
DRILL
PULD
T
Tag up, check well for flow
72.2
72.2
19:00
19:15
9/17/2018
9/17/2018
0.60
PROD'/
DRILL
PULD
T
Unstab INJH, swap out motor, inspect
72.2
0.0
19:15
19:51
j
bit., Bit out 1-1 with chipped tooth on
reamer
Page 2137 ReportPrinted: 10/15/2018
Operations Summary (with Timelog Depths)
31-01
•
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Sten Depth
I
Stert Time
End Tim
our (hr)
Phase
op Code
Activity Code
Tare P -T -X
Operation
Mal
End Depth Me)
9/17/2018
9/17/2018
0.50
PROD1
DRILL
PULD
T
PU/MU Build BHA#2
0.0
72.2
19:51
20:21
9/17/2018
9/17/2018
0.25
FROM
DRILL
PULD
T
Stab INJH, MU UQ, surface test
72.2
72.2
20:21
20:36
Coiltrak tools (good -test)
9/1712018
9/17/2018
0.50
PROD1
DRILL
TRIP
T
RIH, following MP Schedule
72.2
3,500.0
20:36
21:06
9117/2018
9/17/2018
0.25
PROD1
DRILL
TRIP
T
Function opened Orbit valve
3,500.0
3,500.0
21:06
21:21
9117/2018
9/17/2018
1.20
PROM
DRILL
TRIP
T
Continue IH
3,500.0
8,395.0
21:21
22:33
9/17/2018
9/17/2018
0.20
PROD1
DRILL
DLOG
T
Log the K1, minus 21.5' correction
8,395.0
8,423.0
22:33
22:45
9/17/2018
9117/2018
0.20
PROM
DRILL
TRIP
T
Contiinue IH
8,423.0
8,749.0
22:45
22:57
9/1712018
9/17/2018
0.20
PROD1
DRILL
DLOG
T
Log the RA marker 8,733'
8,749.0
8,755.0
22:57
23:09
9/1712018
9/1712018
0.20
PROD1
DRILL
TRIP
T
Continue IH
8,755.0
8,845.0
23:09
23:21
9/17/2018
9/18/2018
0.65
PROD1
DRILL
DRLG
P
OBD, 1.6 bppm at 3,724 psi, diff=3478
8,845.0
8,894.0
23:21
00:00
psi, WHP=292, BHP=4,066, IA=611,
OA=159
9/18/2018
9118/2018
2.80
PROM
DRILL
DRLG
P
OBD, 1.6 bppm at 3,724 psi, diff -3478
8,894.0
9,170.0
00:00
02:48
psi, WHP=292, BHP=4,066, IA=611,
OA=159
9118/2018
911812018
2.40
PROD1
DRILL
TRIP
P
9170', Call end of build, Pump 5 X 5
9,170.0
67.0
02:48
05:12
Sweeps, Avg DLS= 46.06°
9118/2018
9/18/2018
0.40
PROD1
DRILL
PULD
P
At surface, Lay down BHA#3
67.0
0.0
05:12
05:36
9/18/2018
9/18/2018
0.90
PROD1
DRILL
PULD
P
M/U BHA #4, L1 lateral drilling BHA
0.0
78.2
05:36
06:30
wtth .5° AKO motor, New HYC Al
bicenler with 11 MM cuters, and
agitator, M/U to coil and surface test.
Equalize orbit valve and open
9/18/2018
9/18/2018
1.60
PROD1
DRILL
TRIP
P
RIH, EDC closed, Shallow test agitator
78.2
8,400.0
06:30
08:06
@ 500'. Start new mud down CT @
3500'
9/18/2018
9118/2018
0.20
PROM
DRILL
DLOG
P
Log K1 for -21.5, PUW=39K
8,400.0
8,445.0
08:06
08:18
9/18/2018
9/1812018
0.30
PROM
DRILL
TRIP
P
Continue in hole
8,445.0
9,157.0
08:18
08:36
9/18/2018
9/18/2018
0.30
PROM
DRILL
DRLG
P
9157, Tag up 13' high. Pull off bottom.
9,157.0
8,750.0
08:36
08:54
PUH to log RA
9118/2018
9/18/2018
0.10
FROM
DRILL
DLOG
P
8750 Log RA marker for -1"
8,750.0
8,769.0
08:54
09:00
9118/2010
9/18/2018
0.10
FROM
DRILL
TRIP
P
RBIH, tag up 2 9169'
6,769.0
9,169.0
09:00
09:06
9/18/2018
9/18/2018
2.80
PROD1
DRILL
DRLG
P
9169' Drill, 1.81 BPM @ 4527 PSI FS,
9,169.0
9,470.0
09:06
11:54
1
BHP=5783, New mud at bit
9/18/2018
9/18/2018
0.10
PROD1
DRILL
WPRT
P
BHA wiper to get off tool stops,
9,470.0
9,470.0
11:54
12:00
PUW=39K
9118/2018
9/18/2018
0.90
FROM
DRILL
DRLG
P
9470', Drill, 1.8 BPM @ 4790 PSI FS,
9,470.0
9,570.0
12:00
12:54
BHP=3964
9/1812018
9/18/2018
0.80
PROD1
DRILL
WPRT
P
Wiper to 8800', PUW=39K, Frac sand
9,570.0
9,570.0
12:54
13:42
coming back in cuttings, Clean trip up
and down
9/18/2018
9118/2018
3.60
PROD1
DRILL
DRLG
P
9570', drill, 1.8 BPM @4790 PSI FS,
9,570.0
9,970.0
13:42
17:18
BHP=4023, RIW=14.3K
9118/2018
9118/2018-1-0
40
PROD1
DRILL
WPRT
P
Wiper up -hole, PUW=41K
9,970.0
8,800.0
17:18
17:42
Page 3137 Report Printed: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
start Depth
swThie
End Time
Dur(hn
phase
op code
Activity Code
rime P -T -X
Operation
(fits
End Depth(hKB)
9/18/2018
9/18/2018
1.20
PROD?
DRILL
WPRT
P
Wiper in-hole, losing CWT, PU, reduce
8,800.0
9,970.0
17:42
18:54
rule & speed, get to bottom, continue
_
to have significant frac sand over
shakers
9/18/2018
9/18/2018
0.80
PROM
DRILL
DRLG
P
Drill, CWT = OK, WOB = 1.4K, BHP =
9,970.0
10,022.0
18:54
19:42
4088 psi, WHP = 175 psi, pump 5x5
sweeps
9/18/2018
9/18/2018
0.40
PROD1
DRILL
WPRT
P
Pull early wiper to clean up hole, PUW
10,022.0
8,683.0
19:42
20:06
= 41K, continued significant frac sand
overshaker
9/18/2018
9/18/2018
0.70
PROD1
DRILL
WPRT
P
Wiper in-hole, log RA for+2.5'
8,683.0
9,250.0
20:06
20:48
corretion, stacking weight at -9250',
PUH, dragging weight (-42K CWT & -
2K negative WOB)
9/18/2018
9/18/2018
2.00
PROD1
DRILL
CIRC
P
Pump 5x5 sweeps, decision made to
9,250.0
8,880.0
20:48
22:48
continue slowly uphole cleaning up
above BHA, pump numerous
additional sweeps, 7 bottoms up &
continue to have significant frac sand
in samples (not cleaning up)
9/18/2018
9/18/2018
0.90
PROD1
DRILL
CIRC
P
Pull into cased hole, circulate bottoms
8,880.0
7,600.0
22:48
23:42
up, jog up to 7600', jog produced
increased amount of cuttiing/frac sand
overshaker
9/18/2018
9/19/2018
0.30
PROD1
DRILL
CIRC
P
RBIH to 8600', begin another jog up to
7,600.0
8,600.0
23:42
00:00
7600'
9/19/2018
9/19/2018
0.80
PROD1
DRILL
CIRC
P
Continue jog to 7600', density out up
8,600.0
8,600.0
00:00
00:48
to 9.06 ppg, RBIH to 8600, repeat,
continued large quantities of frac sand
over shaker (near 100% frac sand
w/reduction in cuttings)
9/19/2018
9/19/2018
0.70
PROM
DRILL
CIRC
P
Pump sweeps & jog again to 7600',
8,600.0
8,600.0
00:48
01:30
minimal cuttings/frac sand over
shakers
9/19/2018
9/19/2018
1.00
PROD1
DRILL
WPRT
P
Attempt to RBIH to drill, log RAfor+2'
8,600.0
8,732.0
01:30
02:30
correction, stack weight at 9210%
continue stacking weight through
9240', PUH, dragging heavy 50K CWT
& -7K WOB, packing off, significant
motor work, get to 8777', -7K WOB,
RBIH, stack 8K WOB at 8784', pull to
60K through window, can orient,
pumps down coming through window,
unable to move pipe
9/19/2018
9/19/2018
1.70
PROM
DRILL
CIRC
T
Confer wttown, await instructions on
8,732.0
8,732.0
02:30
04:12
bringing up pump, can orient, bring
rate to .25 bpm, have returns, attempt
Ito
pull up, pull to -7K WOB
9/19/2018
9/19/2018
1.80
PROD1
DRILL
CIRC
T
Continue to circulate al .25 bpm
8,732.0
8,732.0
04:12
06:00
attempting to work pipe up and down
intermittenffy, then allow additional
circulation time, no success, confer w/
town, bring rate up to .5 bpm, 1 for 1
returns, unable to break free
9/19/2018
9/19/2018
2.70
PROM
DRILL
CIRC
T
Crew chane, Bring pump rate up to
8,732.0
8,732.0
06:00
08:42
1.54 BPM. Unable to orient at this
rate. Diff pressure Q 1700 PSI if not
stalled at near stall. Circulating 1 to 1.
Work pipe up to 52K =-15K DHWOB.
Down to -1 OK DHWOB. No
movement. Pump two serls of 5 X 5
sweeps to clear up hole.
Page 4137 ReportPrinted: 10/15/2018
a Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
FSE Time
our (no
Phase
Do Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (WB)
9/19/2018
9/19/2016
0.70
PROD1
DRILL
CIRC
T
Line up to pump down backside, .2
8,732.0
8,732.0
08:42
09:24
BPM Q 1750 PSI WHP. Unable to
pump rate down backside. Line back
up to coil. Working choke and pump
got free going down
9/19/2018
9/19/2018
0.50
PROD1
DRILL
WPRT
T
RIH Pumping 1.25 BPM. Start sweeps
8,732.0
8,770.0
09:24
09:54
down CT. Packing off, stuck @ 8770.
Work pipe pull free. 55K
9/19/2018
9/19/2018
0.50
PROD1
DRILL
CIRC
T
Pulling uphole, sweeps coming out.
8,770.0
8,731.0
09:54
10:24
Take a couple of runs at window at
different orientations. Hanging up
unable to come up through window
able to run back in hole. Become
stuck in window. Work pipe up and
down. Increase WHIP. Pop free woking
down. Pull up through window
9/19/2018
9/19/2018
0.30
PROD1
DRILL
WPRT
P
Pull uphole
8,731.0
8,390.0
10:24
10:42
9/19/2018
9/19/2018
0.20
PROD1
DRILL
DLOG
P
Log K1 for +3'corection
8,390.0
8,422.0
10:42
10:54
9/19/2018
9/19/2018
0.70
PROD1
DRILL
TRIP
P
RBIH to clean up seconday, wedge
8,422.0
8,715.0
10:54
11:36
setting area, Recip area, pump
sweeps
9/19/2018
9/19/2018
1.80
PROD1
DRILL
TRIP
P
POOH, EDC closed
8,715.0
64.8
11:36
13:24
9/19/2018
9/19/2018
1.30
PROD1
DRILL
PULD
P
At surace, Tag up and space out.
64.8
0.0
13:24
14:42
PJSM PUD BHA#4. BHA out with no
scrape marks on string. Motor has 1
fill port missing. Bit out with 2 chipped
teeth on reamer
9/19/2018
9/19/2018
3.60
PROD1
DRILL
SLKL
T
R/U slick line / PDS caliper to
0.0
0.0
14:42
18:18
diagnose window problems, PT to
1800 psi
9/19/2018
9/19/2018
2.70
PROW
DRILL
SLKL
T
RIH with caliper on slick -line, log 8760'
0.0
0.0
18:16
21:00
to 8400', POOH
9/19/2018
9/19/2018
1.00
PROD1
DRILL
SLKL
T
Break off lubricator, RD caliper, PDS
0.0
0.0
21:00
22:00
rep performed intial data evaluation,
insufficient data, did not fully exit
window
9119/2018
9/20/2018
2.00
PROD1
DRILL
SLKL
T
RU caliper to repeat run, RIH to 8790',
0.0
8,790.0
22:00
00:00
1
1
1 await arm timer, log 8785'to 8400'
9/20/2018
9/20/2018
PROD1
00:00
00:00
9/20/2018
9/20/2018
1.20
PROD1
DRILL
SLKL
T
Await caliper timer, complete caliper
8,790.0
0.0
00:00
01:12
run, POOH, tag up
9/20/2018
9/20/2018
0.30
PROD1
DRILL
SLKL
T
PJSM, pop off lubricator, RD caliper,
0.0
0.0
01:12
01:30
stab lubricator back on
9/20/2018
9/20/2018
2.70
PROD1
DRILL
SLKL
T
Await caliper data processing (rush
0.0
0.0
01:30
04:12
job requested)
0.6' AKO motor ready, X -Lock located
& ready for delivery, NS Wedge ready
for delivery, PDL pre -loaded
9/2012018
9/20/2018
1.30
PROD1
DRILL
SLKL
T
Recieve & evaluate caliper data, await
0.0
0.0
04:12
05:30
plan forward
9/20/2018
9/20/2018
0.70
PROD1
DRILL
SLKL
T
Plan forward to run crayola mill in
0.0
0.0
05:30
06:12
window, rig down slick line
9/20/2018
9/20/2018
1.50
PROD1
DRILL
PULD
T
PJSM, PD pre loaded BHA#5 with
0.0
62.8
06:12
07:42
2.79 Cmyola mill, .6° AKO motor.
Make up injecor andsurface lest
9/20/2018
9/20/2018
1.50
PROD?
DRILL
TRIP
T
Trip in hole BHA #5, EDC open
62.8
8,400.0
07:42
09:12
Page 5/37 Report Printed: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Smit Depth
Sum nme
Entl Time
Dur (N)
Phase
Op Code
Acthiy Code
Time P -T -X
operatl
(fixe)
I End Depth(WEn
9/20/2018
9/20/2018
0.20
PRODi
DRILL
DLOG
T
Log K1 for -1 8'correction, PUW=34K,
8,400.0
8,428.0
09:12
09:24
Close EDC
9/2012018
9/2012018
0.20
PRODi
DRILL
TRIP
T
Continue in well
8,428.0
8,715.0
09:24
09:36
9/2012018
9/20/2018
4.00
PRODt
DRILL
MILL
T
8715, Pumps on 1.8 BPM @ 3890 PSI
8,715.0
8,740.0
09:36
13:36
FS, BHP=3867, Stall at 8734, Pick up
and restart. Mill down to 8740.
Perform passes @ 30L, 30R, 180R.
Dry drift window- looks good. pump
sweeps. No material on shaker
9/20/2018
9/20/2018
1.80
PROD1
DRILL
TRIP
T
8740, Trip out of hole
8,740.0
47.9
13:36
15:24
9/2012018
9120/2018
0.90
PROD1
DRILL
PULD
T
At surace, tag up and space out.
47.9
0.0
15:24
16:18
PJSM, PUD BHA#5. Mill out @ 2.79
NoGo
9/2012018
9/20/2018
0.80
PROD1
DRILL
PULD
T
PJSM, PD BHA#6 with 2.74 D-331
0.0
62.0
16:18
17.06
ridgeset with up cutters on 1 ° AKO
motor. No agitaor
9/2012018
9/20/2018
1.60
PROD1
DRILL
TRIP
T
RIH w/ BHA #6
62.0
8,407.0
17:06
18:42
9/20/2016
9/20/2018
0.20
PROD1
DRILL
DLOG
T
Log K1 for -17.5' correction, PUW =
8,407.0
8,438.0
1842
1854
134K, dose EDC
9/20/2018
9/20/2018
0.50
PROD1
DRILL
TRIP
T
Cotinue RIH to 8811', rate in = 1.8
8,438.0
8,811.0
18:54
19:24
bpm, FS = 513 psi, BHP = 3926 psi,
WHIP = 215 psi, clean through window
(entire BHA), PUW = 37K, pull BHA
back up through window, clean, RBIH
9/20/2018
9/20/2018
0.30
PROD1
DRILL
TRIP
T
Continue FCO, FS = 510 psi, BHP =
8,811.0
8,876.0
19:24
19:42
3952, CWT= 17.5K
Stack weight at:
8850', WOB = 2K, PUW = 37K
8,863', WOB = 2.5K, PUW = 37K
8850', WOB = 4.8K, PUW = 37K
8876', WOB = 2.6K, PUW = 38K,
dragging negative WOB (-7K), dp =
1130 psi
9/20/2018
9/20/2018
0.80
PROD1
DRILL
TRIP
T
Pump 5x5 sweeps, frac sand over
8,876.0
8,952.0
19:42
20:30
shakers, wiper up through window,
RBIH
Stack weight at 8869', packing off,
PUW = 40K, majority dirt w/ frac sand
over shaker, pump 5x5 sweeps, stack
at 8913', continue to take small bites &
pull BHA wipers, begiin to pack off at
8853', begin to go into stall
9/2012018
9120/2018
1.10
PRODi
DRILL
WPRT
T
Wiper to 7600', PUW = 38K, large
8,952.0
8,952.0
20:30
21:36
quantities of frac sand over shakers,
RBIH
9/2012018
9/20/2018
0.80
PROW
DRILL
TRIP
T
Continue FCO, FS = 516 psi, BHP =
8,952.0
9,160.0
21:36
22:24
4000 psi, pump 5x5 sweeps, stack at
9158', PUW = 50K, stack higher at
9144', begin packing off& dragging
heavy
9/20/2018
9/20/2018
0.30
PROD1
DRILL
WPRT
T
Wiper, PUW =40K, packing off at
9,160.0
9,160.0
22:24
22:42
8811', jog down -hole, continue wiper
to 8500', jog down to 8700', RBIH,
stack weight 8850'- 8875', work
interval, stack multiple times at 9148'
9/20/2018
9/21/2018
1.30
PROD1
DRILL
TRIP
T
Continue from 9160', FS = 515 psi,
9,160.0
9,173.0
22:42
00:00
1
BHP = 4032 psi,
Page 6137 Report Printed: 1011512018
. Operations Summary (with Timelog Depths)
31-01
• w
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Star) Depth
StartTime
EndTim
Dur(hr)
Phew
Op Code
Acbriry Code
Txre P-T-X
Operation
(fINB)
End Depth(fKB)
9/21/2018
9/21/2018
0.20
PROD1
DRILL
TRIP
T
Working back down to 9173', FS =
9,173.0
9,174.0
00:00
00:12
500 psi, BHP = 4037 psi, difficulty
working back to 9173', short pack-off
events, dragging heavy on PU's
9/21/2018
9/21/2018
1.20
PROD1
DRILL
WPRT
T
Begin 400'wiper, PUW=41 K, pack-
9,174.0
8,700.0
00:12
01:24
off at 8900' while PUH, unable to
maintain 1.8 bpm as ECD climbs to 14
ppg, able to orient, have reduced flow
out, drop speed to 2 fpm up-hole,
allow flow to erode pack-off increasing
rate as BHP allows,
Work through pack-off, take 60 bbl to
tiger tank (1.25 bottoms up, density
out looks good), pull through window,
dean
9/21/2018
9/21/2018
2.20
PROD1
DRILL
CIRC
T
Pump sweeps, pull up to 7600' (50
8,700.0
8,700.0
01:24
03:36
fpm), circulate bottoms up, repeat jog
to 7600' (100 fpm), significant frac
sand over shakers, trace amounts of
small glass/epoxy type pieces in
cuttings (puple in color, -1/4" in size)
9/21/2018
9/21/2018
1.40
PROD?
DRILL
TRIP
T
RBIH, taking small bites, followed by
8,700.0
9,019.0
03:36
05:00
short BHA wiper attempting to work £II
above BHA, working down to 9174',
pumping 5x5 sweeps, FS = 505 psi,
BHP = 4021 psi
9121/2018
9/21/2018
0.70
PRODi
DRILL
TRIP
T
Continue working down from 9019'
9,019.0
9,120.0
05:00
05:42
912112018
9121/2018
0.40
PRODi
DRILL
TRIP
T
Pull wiper to window and back in
9,120.0
9,120.0
05:42
06:06
9121/2018
9121/2018
0.90
PRODt
DRILL
TRIP
T
9120 Small bites 10-20 fl. then BHA
9,120.0
9,177.0
06:06
07:00
Wiper
9/21/2018
9121/2018
0.30
PROD1
DRILL
TRIP
T
Pull wiper to window at 8850 pulling
9,177.0
9,177.0
07:00
07:18
heavy, Packing off, try cleaning up
area, work pipe, recip
9/21/2018
9/21/2018
1.50
PROD1
DRILL
TRIP
T
Still looks like packing off but now
9,177.0
8,720.0
07:18
08:48
suspect packing at surface, Open
tango valves to obtain back up WHP,
Well head not at zero as shown by
normal gauge, returns been at 1 for 1.
Packed off upstream from WHP
transducer
9/21/2018
9/21/2018
0.50
PROD1
DRILL
CIRC
T
8720, in casing, elm bottoms up while
8,720.0
8,629.0
08:48
09:18
pulling up hole
9/21/2018
9121/2018
2.60
PROD1
DRILL
SVRG
T
Bottoms up clear, Shut down and blow
8,629.0
8,629.0
09:18
11:54
down mico motion. No good. Break
out micro motion. Run snake through
8. Was clear. Inspect reducing nipple
upstream of micro motion. Packed
tight with resin chunks. Break hardline
apart and dear. Put everything back
together. Change out WHP transducer
by MP 13
9/2112018
9/21/2018
0.90
PROD1
DRILL
TRIP
T
Break circulation, Trip in to 8890 clean
8,629.0
8,890.0
11:54
12:48
through window, PUH to inspect
choke, Swap to choke A and service
choke B
9/21/2018
9/21/2018
0.90
PROD?
DRILL
TRIP
T
RBIH to 9146, PUH Micro motion
8,890.0
8,698.0
12:48
13:42
plugging off, By pass micro motion
9/21/2018
9/21/2018
0.90
PROD1
DRILL
TRIP
T
RIH, 1.8 BPM, run down to 9150 and
8,698.0
9,202.0
13:42
14:36
wipe up to 9103, RBIH to 9192 work
down to 9202
Page 7137 ReportPrinted: 1011512018
. Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depm
Start Time
End Time
Dur thr)
Phase
Op Code
Activity Code
Time P-T.X
Operation
MIKE)
End Depth(MB)
9/21/2018
9/21/2018
1.70
PROW
DRILL
TRIP
T
9202, PUH to 8860 work pipe down
9,202.0
8,750.0
14:36
16:18
stacking out4.6K DHWOB. Pick up to
52K, continue trying to go down. No
go. Work up to 8762. Unable to go
down or up.
9/21/2018
9/21/2018
0.30
PROD1
DRILL
CIRC
T
Shut down pump to relax motor stall.
8,750.0
8,750.0
16:18
16:36
Work down. Unable to move up or
down. Unable to get air through micro
motion after trying o flush with water.
Work up to 70K
9/2112018
9/21/2018
1.40
PROD1
DRILL
CIRC
T
Continue working on micro motion.
8,750.0
8,750.0
16:36
18:00
Pump sweeps in prepemlion for LVT
9/21/2018
9/21/2018
1.00
PROD1
DRILL
CIRC
T
Confer with town, pumps sweeps,
8,750.0
8,744.0
18:00
19:00
circulate 1.5 bottoms up after sweeps
exit bit, pump 14 bbl LVT, 5 bbl out the
bit (top @ -7718), drop pumps, shut
in choke, lel soak, BHP climbs to 4600
psi, WHIP climbs to 1727 psi, work
pipe upt to 80K, 2 bbl more LVT out
the bit, let soak in tension, break free
at 70K tension, stuck again at -8742'
Gather manual straps of pits (MM
bypassed), strap indicates 1 bpm
losses, reduce rate to 1 bpm
9/21/2018
9/21/2018
1.70
PROD1
DRILL
CIRC
T
7 bbl LVT total out bit (top = 7301'),
8,744.0
8,744.0
19:00
20:42
can orient, lel soak in tension, 11 bbl
LVT out the bit, let soak in tension,
work pipe, let soak in compression,
pump additional LVT in compression,
all LVT out, let soak, work pipe, no
success,
Begin working pipe pumping again, no
success
9/21/2018
9/21/2018
1.00
PROD1
DRILL
CIRC
T
Confer with town on plan forward,
8,744.0
8,744.0
20:42
21:42
build low vis sweeps and plan to pump
while in compression
9/21/2018
9/21/2018
1.70
PROD1
DRILL
CIRC
T
Pump 10x10 (1.8 bpm) in
8,744.0
8,744.0
21:42
23:24
compression, -1 bpm losses, BHP =
4000 psi, WHP = 604 psi, WOB = 8K,
with sweep well above BHA begin
working pipe, no success
9/21/2018
9/22/2018
0.60
PROD1
DRILL
CIRC
T
PJSM, discuss plan to pump down the
8,744.0
8,744.0
23:24
00:00
back -side, targeting 2200 psi WHIP,
ensure coil has trapped pressure,
watch dp over ( not to exceed Max dp
over EDC = 1400 psi), bring WHIP to
2600 psi, work pipe, no success, sit in
-1 OK CWT compression
9/22/2018
9/2212018
2.50
PROD?
DRILL
CIRC
T
Continue in compression, pumping
8,744.0
8,744.0
00:00
02:30
down back -side, work pipe in down-
hole direction, no success, work WHIP
& pipe, sit in compression, continue to
work in down direction
9/22/2018
9/22/2018
1.40
PROD1
DRILL
CIRC
T
Work pipe up -hole, no success
8,744.0
8,744.0
02:30
03:54
9/22/2018
9/22/2018
3.20
PROD1
DRILL
CIRC
T
Confer w/ town, decision made to
8,744.0
8,744.0
03:54
07:06
open EDC, circulate, mobilize BOT to
fish
SBHP: BHP= 4427 psi, TVD sensor =
6314.84, EMW = 13.5 ppg
Page 8137 Report Printed: 10115/2018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End lane
Dw(ho
phase
op Cale
A Wty Code
Tana P -T -X
op.tan
(W13)
End Depth(W-B)
9/22/2018
9/22/2018
0.10
PROD1
DRILL
CIRC
T
Shut down pump, Close EDC, work
8,744.0
8,744.0
07:06
07:12
pipe -16 to +80 3 cycles, no
movement
9/22/2018
9/2212018
1.20
PROD?
DRILL
PRTS
T
Perform static pressure lest, Inial #'s
8,744.0
8,744.0
07:12
08:24
WHP=1426, EMW=13.12, Bleed off
WHP to 600 PSI, BHP to 4118 after 10
minutes, 2nd bleed HP down to
3783PSI, Built up to 4096 After 10
minutes. Bleed 3rd time 3714PSI build
to 4074 PSI after 10 minutes. Bleed
off while working pipe. Final PT after
20 minutes 3775 PSI, EMW=12.28
9/22/2018
9/22/2018
0.20
PROM
DRILL
FISH
T
Send release tool command, See data
8,744.0
8,744.0
08:24
08:36
drop off, Pick up free @ 42K. Subtract
46.3' from counters. tool left in hole
9122/2018
9/22/2018
0.90
PROD1
DRILL
SVRG
T
Blow down MM and lines. Pull off
8,744.0
8,744.0
08:36
09:30
micro motion and snake out more
resin pieces. reinstall
9/22/2018
9/2212018
1.40
PROD1
DRILL
TRIP
T
POOH with CTC, UQC, LQC, D97,8,744.0
9.0
09:30
10:54
Wear sub, P&C, upper portion of EDC,
15.99', Left in hole, D -3312.740D mill,
2 318" motor, flapper valve sub,
Hydraulic orienter, Drilling gamma
sub, Drilling performance sub, lower
setion of EDC. Length 46.33'
9/22/2018
9122/2018
0.40
PROD1
DRILL
PULD
T
Al surface, Gose swab, Pull BHA #6
9.0
0.0
1054
11:18
from well and lay down
9/22/2018
9/2212018
2.20
FROM
DRILL
PULD
T
PJSM, M/U BHA#7 with 2 1/2" GS,
0.0
68.0
11:18
13:30
Up Down jars, weight bars,
Accelorater with coil trac. Pressure
deploy, Surface test
9/2212018
9/22/2018
1.60
PROD1
DRILL
TRIP
T
Trip in hole, EDC shut pumping min
68.0
8,400.0
13:30
15:06
rate
9/22/2018
9/22/2018
0.20
PROD1
DRILL
DLOG
T
Log Kt for -15', PUW=35K
8,400.0
8,423.0
15:06
15:18
9/2212018
9122/2018
0.30
PROD1
DRILL
TRIP
T
Continue in well, Set down @ 8711',
8,423.0
8,711.0
15:18
15:36
PUH to confirm latch
9/22/2018
9/22/2018
3.50
PROD1
DRILL
FISH
T
Begin jaring down for 15 cycles at 8K
8,711.0
8,711.0
15:36
19:06
down no movement. Begin jaring
down and up, 62K up 0 down,
continue jarring 60 cycles, dump well-
head pressure to zero, attempt 10
more licks, release off GS to perform
pipe fatique management
9/2212018
9/2212018
1.50
PROM
DRILL
TRIP
T
POOH
8,711.0
65.0
19:06
20:36
9/22/2018
9/2212018
1.00
PROD1
DRILL
PULD
T
PJSM, PUD BHA#7
65.0
0.0
20:36
21:36
9/22/2018
9/22/2018
1.40
PRODt
DRILL
CIRC
T
MU nozzle, stab on, roll coil to fresh
0.0
0.0
21:36
23:00
water, jet stack, pop off, clear floor
9122/2018
9/23/2018
1.00
PRODt
DRILL
BOPE
P
PJSM, function test BOPE's, clear
0.0
0.0
23:00
00:00
floor, begin change out ring on love -
joy (in SIMOPS)
9/23/2018
9123/2018
0.50
PROD1
DRILL
RGRP
T
Continue work on love -joy (charting
0.0
0.0
00:00
00:30
out ring)
9123/2018
1.00
PROD1
DRILL
CTOP
T
Epoxy & heat shrink a -line end, slide
0.0
0.0
00:30
01:30
cart in, stab on, pump slack back, up
19123/2018
1
1
to 3 bpm (4500 psi), heard a -line
rattling
Page 9/37 ReportPrinted: 10/1512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Tore
EM Time
Mir (hr)
Phan
op code
Activtly Code
Time P -T -X
Operation
inks)
End DepM(flka)
9/23/2018
9123/2018
3.00
PROD1
DRILL
CTOP
T
Pop off, rig up hydraulic cutter, cut
0.0
0.0
01:30
04:30
coil, found e4ine in 35', cut total of
300' of pipe, rig down cutter, make
final hand cut, lest a -line, ream coil,
install Kendle connector, dimpler
broke ram shaft, replace. Pull Test to
70K
9/23/2018
9123/2018
0.90
PROD1
DRILL
CTOP
T
Re -head a -line, / UQC PT to 4000PSI
0.0
0.0
04:30
05:24
9/23/2018
9123/2018
0.80
PROD1
DRILL
CTOP
T
Make up n=le. stab on, displace coil
0.0
0.0
05:24
06:12
1 back to mud.
9/23/2018
9/23/2018
1.30
PROD1
DRILL
PULD
T
PJSM, M/U BHA#8 with 2.5" GS and
0.0
54.4
06:12
07:30
2.13 Hipp Tripper. M/U to coil trac.
WU to coil and surface test. Good
test. Inspect pack offs.
9/23/2018
9123/2018
1.60
PROD?
DRILL
TRIP
T
RIH BHA#8
54.4
8,390.0
07:30
09:06
9/23/2018
9/23/2018
0.20
PROD1
DRILL
DLOG
T
Log K1 for -17', PUW=35K, Close
8,390.0
8,401.0
09:06
09:18
1
1
EDC
9/232018
9/23/2018
0.20
PROD1
DRILL
TRIP
T
Continue in to top of fish @ 8709 dry,
8,401.0
8,709.0
09:18
09:30
18707 with pumps
9/232018
9/23/2018
1.40
PROD1
DRILL
FISH
T
Set down on top of fish. PUH to
8,707.0
8,707.0
09:30
10:54
ensure latch, 40K PUW, -7 DHWOB,
slack off, bring pump on to check for
vibration. 1.11 BPM @ 4050 PSI. work
down @.1 fl. Stall at 8707. Pick up
and restart. Run 2.6 K DHWOB. Start
8 BBI slug of LVF down CT. continue
working in compression
9123/2018
91232018
1.00
PROD1
DRILL
FISH
T
Shut down and lel LVT soak around
8,707.0
5,707.0
10:54
11:54
fish 10 minutes, continue hipp tripping
down. .97 BPM @ 4039 PSI.
9232018
9232018
0.60
PROD1
DRILL
FISH
T
Start working Hip Tripper in tension.
8,707.0
8,707.0
11:54
12:30
61 K, DHWOB=-19K. Continue slowly
increaseing tension to 70K then work
up and down
9123/2018
9232018
0.20
PROD1
DRILL
FISH
T
Stall, PU and release, possibly have
8,707.0
8,707.0
12:30
12:42
top of fish @ 8505
9/23/2018
9/23/2018
0.30
PROD1
DRILL
FISH
T
Continue to workwork down
8,707.0
8,707.0
12:42
13:00
9/23/2018
9/23/2018
0.10
PROD1
DRILL
FISH
T
Releae from fish. PUH for tie in
8,707.0
8,380.0
13:00
13:06
9123/2018
923/2018
0.10
PROD?
DRILL
DLOG
T
Log K1 for+5'
8,380.0
8,409.6-
13:06
13:12
9/232018
923/2018
020
PROD1
DRILL
TRIP
T
RBIH to confirm TOF, Latch dry @
8,409.0
8,709.0
13:12
13:24
8709 dry. Fish has not moved
9/232018
923/2018
0.30
PRODi
DRILL
FISH
T
Hip tripper loosing action. Start
8,709.0
8,695.0
13:24
13:42
working pipe up to 80K observed fish
letting go weight droped to 26K. PUH
still latched fish lodged. work pipe up
Ito 85 K and down
9/232018
923/2018
0.20
PROW
DRILL
TRIP
T
PUH to tie in
8,695.0
8,380.0
13:42
13:54
9123/2018
923/2018
0.10
PROD1
DRILL
DLOG
T
Log kt for =1.5'
8,380.0
8,407.0
13:54
14:00
9/232018
923/2018
0.20
PRODt
DRILL
FISH
T
RBIH to check top of fish. Tag up @
8,407.0
8,698.0
14:00
14:12
8698. Fish has moved up hole. Work
pipe to 80 K
9123/2018
9/23/2018
1.90
PROD1
DRILL
TRIP
T
Release from fish, POOH BHA #8 for
8,698.0
35.4
14:12
16:06
Jars
923/2018
9/23/2018
1.20
PROD1
DRILL
PULD
T
At surface, PJSM, PUDBHA#8
35.4
0.0
16:06
17:18 1
Page 10137 Report Printed: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depm
Slav Tmme
End Time
Our(hr)
Phase
op code
Activity Code
Time P -T -X
Operation
(MB)
End Depth(fiKB)
9/23/2018
9/2312018
0.30
PRODI
DRILL
PULD
T
PJSM, PU & put BOT up/down jars, 3
0.0
25.0
17:18
17:36
weight bars, & accelleralor in-hole
9/23/2018
9/2312018
1.80
PRODI
DRILL
RGRP
T
Change out goose -neck rollers, crew
25.0
25.0
17:36
19:24
change out
9/23/2018
9/23/2018
1.20
PROM
DRILL
PULD
T
PD BHA #9 (aceleator, 3 weight bars,
25.0
66.0
19:24
20:36
up/down jars), slide in cart, check
pack -offs, good, MU to coil, tag up, set
counters
9/23/2018
9/23/2018
1.60
PRODI
DRILL
TRIP
T
RIH w/ BHA#9
66.0
8,400.0
20:36
22:12
9/23/2018
9/23/2018
0.30
PROD1
DRILL
DLOG
T
Log K1 for -16' correction, PUW =
8,400.0
8,422.0
22:12
22:30
35K, attempt to close EDC, position
error on EDC, calibrate, EDC closed
9/23/2018
91232018
0.20
PROD1
DRILL
TRIP
T
RIH, tag & latch into fish at 8699'
8,422.0
8,698.0
22:30
22:42
9/23/2018
924/2018
1.30
PROM
DRILL
FISH
T
Jar down on fish (20 licks), no
8,698.0
8,698.0
22:42
00:00
success, jar up 15 (16 licks), sit in
tension @ 80K
9/24/2018
924/2018
1.90
PROD1
DRILL
FISH
T
Prep LVT(sitting in 80K tension), drop
8,698.0
8,698.0
00:00
01:54
to nuetral weight, pump 14 bbl LVT, w/
14 bbl LVT out bit, bullhead LVT 7 bbl
below fish (.25 bpm, 2500 psi WHP)
9/24/2018
924/2018
0.60
PROM
DRILL
FISH
T
Work jars down (101icks down to -1 OK
8,698.0
8,698.0
01:54
02:30
WOB), work jars up (10 licks)
9/24/2018
9/24/2018
0.70
PROM
DRILL
FISH
T
Bullhead remaining 7 Me LVT below
8,698.0
8,698.0
02:30
03:12
fish
9/24/2018
924/2018
1.00
PROM
DRILL
FISH
T
Jar up (5 licks), jar down (5 licks),
8,698.0
8,698.0
03:12
04:12
increase WHIP to 2500 psi, jar up 5
licks dropping WHP, pulling to 80K+,
no movement on fish
9/2412018
9/24/2018
1.50
PROD1
DRILL
TRIP
T
POOH w/ BHA #9 (no fish)
8,698.0
63.0
04:12
05:42
9/2412018
9/2412018
1.40
PRODI
DRILL
PULD
T
At surface, PJSM, PUD BHA #9
63.0
0.0
05:42
07:06
Fishing BHA w/Jars, Lay down BOT
tools
9/24/2018
9/24/2018
4.40
PRODI
DRILL
CTOP
T
PJSM, remove UQC, Boot wire for
0.0
0.0
07:06
11:30
slack mgmt, stab on well, Reverse
circulate CT. Un Stab injector. M1U CT
cutter. Cul 14' CT find wire. Cut 200'
coil for fatigue mgmt. M/U CTC, Pull
test to 70K. Test wire - Good. MIU
UQC. PT UQC & CTC
9/24/2018
9/242018
4.00
PROM
DRILL
RGRP
T
Indenlified leak in inner reel iron at 3 X
0.0
0.0
11:30
15:30
2 crossover. Remove pressure
bulkhead and inner reel iron to replace
hardline gasket in hardline. Replace
reel iron and pressure bulkhead while
waiting on orders
9/24/2018
9/24/2018
0.10
PRODI
DRILL
CTOP
T
Obtain 5000 PT on inner reel iron
0.0
0.0
15:30
15:36
9/24/2018
9/242018
0.30
PROD1
DRILL
CTOP
T
Break off pressure test plate, Install
0.0
0.0
15:36
15:54
1
1
lNozzle.
P/U QTS off riser
9/242018
9/24/2018
0.10
PRODI
DRILL
CTOP
T
Test E -line & polarity post pressure
0.0
0.0
15:54
1600
bulkhead - Good
9/24/2018
9/24/2018
0.50
PROD1
DRILL
PULD
T
Swap out BHA in PDL from Hip tripper
0.0
0.0
16:00
16:30
run to at whipstock
9/24/2018
9/2412018
1.50
PROM
DRILL
W WSP
T
Check all tree tinge bolts for torque
0.0
0.0
16:30
18:00
9/24/2018
9242018
0.80
PROM
DRILL
SFTY
T
Crew change, run valve check list.
0.0
0.0
18:00
18:48
Prep to make up whipstock
9/24/2018
9/24/2018
1.50
PRODI
RPEQPT
PULD
P
PJSM, M/U whipstock and pressure
0.0
73.4
18:48
20:18
deploy. M/U to CT and surface test.
Tag up and set counters
Page 11137
Report Printed: 10/15120-
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SW Depth
Stars Time
End Time
our (hrl
Phase
Op Code
Activity Code
Time P -T -x
Operation
Y")
End Depth(fi(B)
9/2412018
9/24/2018
1.90
PROD1
RPEQPT
TRIP
P
Trip in well, BHA # 10 Whipstock
73.5
8,410.0
20:18
22:12
9/2412018
9/24/2018
0.20
PR0D1
RPEQPT
DLOG
P
Log tie in for -15'
8,410.0
8,444.2
22:12
22:24
9/24/2018
9/24/2018
0.30
PR0D1
RPEQPT
TRIP
P
Continue in well, Get to setting depth
8,444.2
8,692.5
22:24
22:42
8692.5, TOWS @ 8682 oriented to
high side. Shut EDC. Bring pumps
online. See tool shift @ 5100 PSI.
DHWOB=4K. Lift off whipstock
9/24/2018
9/25/2018
1.30
PROD1
RPEQPT
TRIP
P
POOH after setting whipstock
8,692.5
78.0
22:42
00:00
9/25/2018
9/25/2018
1.00
PROD?
RPEQPT
PULD
P
PJSM, PUD BHA#10
78.0
0.0
00:00
01:00
9/25/2018
9/25/2018
1.10
PROD1
WHPST
PULD
P
PD BHA#11 Window Milling Assembly
0.0
74.0
01:00
02:06
#1 (0.6" AKO motor, string reamer,
window mill)
9/25/2018
9/25/2018
1.60
PROD1
WHPST
TRIP
P
RIH w/BHA#11
74.0
8,409.0
02:06
03:42
9/25/2018
9/25/2018
0.30
PROD1
WHPST
DLOG
P
Log K1 for -18' correction, PUW =
8,409.0
8,435.0
03:42
04:00
36K, close EDC, RIW = 18K
9/25/2018
9/25/2018
0.20
PROD?
WHPST
TRIP
P
Contiue RIH, dry tag TOWS @ 8681',
8,435.0
8,680.0
04:00
04:12
PUW = 37K, bring up rate, RBIH to
begin milling
9125/2018
9/25/2018
2.40
PROD1
WHPST
WPST
P
Milling window, 1.8 bpm, FS = 417 psi,
8,680.0
8,681.5
04:12
06:36
BHP = 4004 psi, WHP = 522 psi, stall
getting started @ 8680.4', PU, RBIH &
begin time milling 8680.2, WOB =
1.5K, metal over shakers, begin taking
slight losses, lower WHP to achieve 1
for 1 returns
PU to swap pumps (leaking pop-off),
RBIH & continue milling, mill to
8681.5', stall, PUW = 36K, RBIH
9/25/2018
9/25/2018
3.00
PROD1
WHPST
WPST
P
Continue milling from 8681.5', 1.8
8,681.5
8,683.9
06:36
09:36
-
bpm, FS = 417 psi, BHP = 3883 psi,
WOB = 2K -3K, stall at 8683.9', PUW =
36K, RBIH
9/25/2018
9125/2018
2.90
PROD1
WHPST
WPST
P
Continue milling from 8683.9', 1.8
8,683.9
8,686.2
09:36
12:30
bpm, FS = 420 psi, BHP = 3903 psi,
WHIP = 455 psi, CWT = 18K, WOB
=.9K, stall at 8684'(2 times)
9/25/2018
9/25/2018
0.60
PROD1
WHPST
REAM
P
Make 3 reaming passes on first 6' of
8,686.2
8,686.2
12:30
13:06
window @ HIS, 1 fpm, PUW = 37K,
pump 5x5 sweeps, dry drift up &
down, clean
9/25/2018
9125/2018
1.50
PROD1
WHPST
TRIP
P
POOH, open EDC
8,686.2
74.0
13:06
14:36
9/25/2018
9/25/2018
0.80
PROD1
WHPST
PULD
P
PJSM, PUD BHA#11, LD tools, clear
74.0
0.0
14:36
15:24
floor, string reamer & mill both came
mill came out 2.80" no-go
9/25/2018
9/25/2018
3.00
PROD1
WHPST
WAIT
P
Wait on Weatherford motor
0.0
0.0
15:24
18:24
9/25/2018
9125/2018
1.80
PROD1
WHPST
PULD
P
1.25` Fixed motor on location, PJSM,
0.0
77.0
18:24
20:12
PU & PD BHA#12, skid cart, check
packoffs - good, tag up, set counters,
`• Fat radis speed mill, 2.80" no go,
new string mill SN5284634, 2.80" no
go
9/25/2018
9/25/2018
1.70
PROD1
WHPST
TRIP
P
RIH W BHA#12, second window
77.0
8,410.0
20:12
21:54
1
milling assembly #2.
9/25/2018
9/2512018
0.20
PROD1
WHPST
DLOG
P
Tie into Kl marker for -17.5'
8,410.0
8,434.2
21:54
22:06
correction.
Page 12137 ReportPrinted: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
1
start Time
End rime
Dur (hr)
Phase
Op Cede
Adviry Code
Time P -T -x
Operatlwt
(110)
End Depth (W)
9/25/2018
9/25/2018
0.50
PRODt
WHPST
TRIP
P
PU Wt 36 k lbs, close EDC. Continue
8,434.2
8,687.0
22:06
22:36
to RIH.
9/25/2018
9/26/2018
1.40
PROD1
WHPST
WPST
P
RIH Wt 18k lbs, CT4343 psi @ 1.79
8,687.7
8,688.5
22:36
00:00
bpm, Free spin diff 628 psi, Annular
4018 psi, WH 576 psi, IA 616 psi, OA
174 psi.
See WOB @8687.74 OBD per pan,
WOB 0.44 k Has, CT Wt 18.82, W013.6
-.2 k lbs
9/26/2018
9/26/2018
0.70
PRODt
WHPST
WPST
P
CT 3991 psi @ 1.79 bpm, annular
8,688.5
8,689.2
00:00
00:42
4022 psi, WH 570 psi,
OBD CT Wt 19 k lbs, WOB .8 -.2 k lbs
-following milling schedule.
9/26/2018
9/26/2018
3.80
PROD1
WHPST
WPST
P
Engage auto drill, CT 3980 psi @ 1.79
8,689.2
8,693.5
00:42
04:30
bpm, annular 4022 psi, WH 573 psi,
OBD CT Wt 16.8 k lbs, WOB 0.2
k Ibs-
9/26/2018
9/26/2018
2.50
PROD1
WHPST
WPST
P
CT 4094 psi @ 1.79 bpm, annular
8,693.5
8,706.0
04:30
07:00
4025 psi, WH 580 psi,
OBD CT Wt 15.6 k lbs, WOB 2.37 k
lbs, WOB fell off @ 8693.5
TD rat -hole at 8706', pump sweeps
9/26/2018
9/26/2018
2.50
PROD1
WHPST
REAM
P
Make reaming passes HS (-90 psi
8,706.0
8,706.0
07:00
09:30
motor work @ 8688' up & down), 30"
L, 30"R, & LS, pump sweeps
9/26/2018
9/26/2018
1.80
PROD1
WHPST
TRIP
P
POOH, PUW = 37K, open EDC, PJSM
8,706.0
74.0
09:30
11:18
9/26/2018
9/2612018
1.10
PROD1
WHPST
PULD
P
PUD BHA#12 (crass -training), string
74.0
0.0
11:18
12:24
reamer & mill came out 2.79 no-go
9/262018
9/26/2018
2.10
PROD1
DRILL
CIRC
P
Clear rig floor, MU nozzle, stab on,
0.0
0.0
12:24
14:30
displace coil to fresh water, jet stack,
pop off, break off nozzle, pull checks,
grease tree, grease bravo & romeo
valves, fluid pack
9262018
9/262018
6.50
PROD1
DRILL
BOPE
P
BOPE lest (witness waived by Jeff
0.0
0.0
14:30
21:00
Jones ofAOGCC), test pressure 4900
psi, annular 2500 psi, cycle choke D to
hold pressure, upper 2-3/8" rams, fail /
pass, needed cycling once, some
evidence that the test joint is being
wom by the deployment ram slips.
****Start test 14:30 - End 21:00
9/26/2018
926/2018
0.70
PROD1
DRILL
BOPE
P
Skid cart, stab on, test inner reel iron,
0.0
0.0
21:00
21:42
9/26/2018
9/262018
0.80
PROD1
DRILL
DISP
P
Turn reel over to mud unstab
0.0
0.0
21:42
22:30
9/26/2018
9/26/2018
1.20
PROD1
DRILL
PULD
P
PU & PD BHA#13, AL -03 build drilling
0.0
59.0
22:30
23:42
assembly, 1.8' AKO over RR baker bi
center, inspect pack offs, tag up, set
counters.
9/2612018
9/27/2018
0.30
PROD1
DRILL
TRIP
P
RIH, while swapping coil to new mud
59.0
1,174.0
23:42
00:00
(system #2) exporting returns to the
Bgertank.
9/27/2018
927/2018
1.30
PROD1
DRILL
TRIP
P
Continue to RIH, while swapping coil
1,174.0
8,400.0
00:00
01:18
to new mud (system #2) exporting
returns to the tiger tank.
9/27/2018
9/272018
0.20
PROD1
DRILL
DLOG
P
Tie into K1 marker for -18.5'
8,400.0
8,417.8
01:18
01:30 1
1
I
I
correction.
9/27/2018
9/27/2018
0.50
PROD1
DRILL
TRIP
P
Continue to RIH displacing coil to new
8,417.8
8,706.0
01:30
02:00
1
mud, ssytem #2, PU Wt, 35 k lbs,
close EDC,continue to RH
Page 13137 ReportPrinted: 10/15/2018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SWM Depth
start Time
End Time
Our (m)
Phase
Op Cede
Actively Code
Time P -T -x
operation
(K6)
End Depth (flka)
9/27/2018
9/27/2018
1.30
FROM
DRILL
DRLG
P
RIH Wt 18 k lbs, CT 3802 psi @ 1.79
8,706.0
8,825.0
02:00
03:18
bpm, Free Spin diff. 451 psi, WH 427
psi, IA 614, OA 173. Annular 3988 psi
OBD, CT Wt 17 k Ibs,WOB1.7 k lbs,
ROP 90 ft/hr
Average ROP over interval on bottom
91 ft/hr
9/27/2018
9/27/2018
0.20
PROD1
DRILL
WPRT
P
DD wiper, PU 37 k IDS, Tum around @
8,825.0
8,825.0
03:18
03:30
8769', RBIH
9/27/2018
9/27/2018
2.30
PRODi
DRILL
DRLG
P
RIH Wt 19 k lbs, CT 3682 psi @ 1.80
8,825.0
9,055.0
03:30
05:48
bpm, Free Spin diff. 455 psi, WH 455
psi, annular 4027 psi
OBD, CT Wt 17 k Ibs,WOB1.8 k lbs,
ROP 100 ft/hr
Pumped 5x5 sweep, pulled 100' bha
wiper, PU 41 k lbs.
Drill to called TD of build @ 9055'
9/27/2018
9/27/2018
2.00
PROD1
DRILL
TRIP
P
Pump sweeps, POOH, PJSM
9,055.0
72.0
05:48
07:48
9/27/2018
9/27/2018
1.20
PROD1
DRILL
PULD
P
PUD BHA#13, bit came out a 1-1
72.0
0.0
07:48
09:00
9/27/2018
9/27/2018
1.20
PROD1
DRILL
PULD
P
PD BHA#14(Agitator, 0.5°AKO
0.0
78.0
09:00
10:12
motor, new P104 bit), slide in cart,
check pack -offs, MU to coil, tag up
9/27/2018
9/27/2018
1.50
PROD1
DRILL
TRIP
T
RIH w/ BHA#14, shallow test @ 500',
78.0
78.0
10:12
11:42
1.8 bpm @ dip = 1800 psi, RIH to
600', 1.8 bpm @ dip = 2150 psi
(should be -1000 psi)
Begin POOH, shut down pumps to
close EDC, bore pressure drops (-350
psi dp), bleeder on pump #1 leaking,
swap to mud pump #2, appears as
though upper checks may not be
holding, POOH
9/27/2018
9/27/2018
1.00
PRODi
DRILL
PULD
T
PJSM, PUD BHA#14
78.0
0.0
11:42
12:42
9/27/2018
9/27/2018
0.70
FROM
DRILL
OTHR
T
Agitator& motor function when blown
0.0
0.0
12:42
13:24
down w/ 120 psi air, MU/PU new Coil
Track tools, change out checks in
UQC (obvious stop in one check)
9/27/2018
9/27/2018
1.20
FROM
DRILL
PULD
T
PD BHA#15 (New CoilTrack new
0.0
78.0
13:24
14:36
agitator, new 0.5° motor, P104 bit),
cross -training, slide in cart, MU to coil,
tag up, set counters
9/27/2018
9/27/2018
1.60
PROD1
DRILL
TRIP
P
RIH wl BHA#15, shallow test tools @
78.0
8,400.0
14:36
16:12
515', 1.8 bpm, dp = 900 psi, unload
ODS PDL
927/2018
9/27/2018
0.30
PRODi
DRILL
DLOG
P
Log K1 for -16' correction, PUW =
8,400.0
8,426.0
16:12
16:30
40K, log RA at 8687.5', TOWS =
8680', PUW = 42K @ 8950'
9/27/2018
9/27/2018
0.40
FROM
DRILL
TRIP
P
Cotinue to RIH
8,400.0
9,055.0
16:30
16:54
9/27/2018
9/27/2018
1.30
PROW
DRILL
DRLG
P
OBD, RIW = 17K, 1.8 bpm, dip = 960
9,055.0
9,106.0
16:54
18:12
psi, CWT = 15K, WOB = 1.71K, BHP =
3981 psi, WHIP = 368 psi, circ
pressure = 4159 psi
9/27/2018
9/27/2018
0.10
PROM
DRILL
WPRT
P
PU Wt 45 k IDS, pick up to get
9,106.0
9,106.0
18:12
18:18 1
1
I
parameters. RBIH
Page 14137 Report Printed: 10115/2018
Summary (with Timelog Depths)
31-01
lipOperations
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Steri Depth
Stars Tern
End Time
Dur (hr)
Phase
Op Code
ACNhF Code
Tune P -T -X
Operation
(MB)
End OePth(ftKB)
9/27/2018
9/27/2018
2.00
PRODt
DRILL
DRLG
P
RIH Wt 17 k lbs, C14194 psi, @ 1.80
9,106.0
9,305.0
18:18
20:18
bpm, free spin 965 psi,annular 3989
psi, WH 302 psi, IA 630, OA 180.
BOBD, CT Wt 15.2 k lbs, WOB 1.04 k
Is, ROP 100 ft(hr
ROP over interval drilled 99.5 ft/hr
9/27/2018
9/27/2018
0.20
PROD1
DRILL
WPRT
P
PU W139 k lbs, 1 st scheduled wiper
9,305.0
9,305.0
20:18
20:30
after 250'drilled.
PU 250' to EOB, RBIH
No signs of frac sand in returns.
9/2712018
9/27/2018
2.70
PROD1
DRILL
DRLG
P
Ct 4386 psi, @ 1.80 bpm, free spin
9,305.0
9,570.0
20:30
23:12
990 psi,annular 4091 psi.
BOBD, CT Wt 15 k lbs, WOB 1.4 k Is,
ROP 140 ft/hr
ROP over interval drilled 981t/hr
9465 PU 44 k Ibs
No signs of frac sand in returns.
9/27/2018
9/27/2018
0.40
PRODi
DRILL
WPRT
P
PU Wt 39 k lbs, 2nd scheduled wiper
9,570.0
8,700.0
23:12
23:36
after 250' drilled.
PU 870'
No signs of frac sand in returns.
9/272018
9/27/2018
0.10
PROM
DRILL
DLOG
P
Log RA for+ 1.5' correction
8,700.0
8,727.1
23:36
23:42
9/27/2018
9/28/2018
0.30
PROD1
DRILL
WPRT
P
RBIH
8,727.1
9,557.0
23:42
00:00
9/28/2018
9/28/2018
0.10
PROD1
DRILL
WPRT
P
RBIH
9,557.0
9,570.0
00:00
00:06
9/2812018
9/282018
2.20
PROD1
DRILL
DRLG
P
Ct psi, @ 1.78 bpm, free spin 897
9,570.0
10,005.0
00:06
02:18
psi,annular 4047 psi.
BOBD, CT Wt 10 k lbs, WOB 1.8 k Is,
ROP 200 ft/hr
ROP over interval drilled 198 ft/hr
9720 PU 40 k lbs - 100' BHA wiper
'• 9,711' pinched choke from 12.3+ to
12R ppg
9796', pinched choke to 12.5 ppg
No signs of frac sand in returns.
9/28/2018
9/28/2018
0.50
PROM
DRILL
WPRT
P
PU, Wt 40k lbs Wiper#1
10,005.0
8,670.0
02:18
02:48
9/28/2018
928/2018
0.40
PRODt
DRILL
WPRT
P
Park @8670',-6243.67 TVD.
8,670.0
8,670.0
02:48
03:12
Monitor BHP,
Pressure climbed from 4088 psi to
4110 psi -
*'•12.66 ppg EMW
9/28/2018
9/282018
0.50
PROD1
DRILL
WPRT
P
RBH, targeting 12.7 ppg EMW @ the
8,670.0
10,005.0
03:12
03:42
window.
928/2018
9/28/2018
1.70
PRODi
DRILL
DRLG
P
Ct 4384 psi, @ 1.78 bpm, free spin
10,005.0
10,258.0
03:42
05:24
881 psi, annular 4191 psi, WH 427
psi.
OBD, CT Wt 12 k lbs, WOB 2 k lbs,
ROP 150 ft/hr
PU 40 k lbs.
9/28/2018
9/28/2018
1.00
PROD1
DRILL
DRLG
P
Ct 4384 psi, @ 1.78 bpm, free spin
10,258.0
10,430.0
05:24
06:24
881 psi, annular 4191 psi, WH 427
psi.
OBD, CT Wt 12 k Ibs, WOB 2 k Ibs,
ROP 150 ft/hr
PU 40 k lbs.
9/28/2018
928/2018
0.40
PROM
DRILL
WPRT
P
Scheduled wiper#2 up -hole, PUW =
10,430.0
9,579.0
06:24
06:48
39K
9/28/2018
928/2018
0.30
PROD1
DRILL
WPRT
P
Wiperin-hole, RIW=11K
9,679.0
10,430.0
06:48
07:06
Page 15137 ReportPrinted: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Depth
Start Time
Er1dTma
Durrx)
Phase
Op Code
Activity Code
Time P-T-X
Operation
End Depth(Mlt)
9/28/2018
9/28/2018
1.20
PROD1
DRILL
DRLG
P
BOBD, CWT = 9K, WOB = 1.3K, BHP.0
10,598.0
07:06
08:18
= 4276, WHP = 507 psi, 1-for-1
returns @ 1.8 bpm, circ pressure4736
psi, 12.9 ppg at window, CWT
rd
falling off (snubbing -2K CWT), pump
sweeps, ROP = 140 fph
9/28/2018
9/28/2018
1.30
PRODi
DRILL
DRLG
P
OBD, BHP = 4350 psi, 1.8 bpm, 1-for-.0
10,850.0
08:18
09:36
1 returns @ 12.9 ppg @ window,
WOB = 2K, circ pressure = 4767 psi,
pump sweeps
Decision made to drop tol2.8 ppg &
take manual straps (attempting to
confirm reservoir is not charging up)
9/28/2018
9/28/2018
0.80
PROM
DRILL
WPRT
P
Wiper, PUW =40K, log RA for+4'
10,850.0
8,668.0
09:36
10:24
1
correction
9/28/2018
9/28/2018
0.50
PROM
DRILL
CIRC
P
Circulate bottoms up
8,700.0
8,669.0
10:24
10:54
9/28/2018
9128/2018
0.40
PROM
DRILL
DLOG
P
Obtain SBHP: bleed down from 13.0
8,669.0
8,669.0
10:54
11:18
ppg to 12.8 ppg (5 times, shut in, MD
= 8669', TVD sensor = 6243',
MW-out = 8.75 ppg, Annular = 4221,
EMW = 13.0 ppg
9/28/2018
9/28/2018
1.20
PROM
DRILL
WPRT
P
Wiper in-hole, CWT weight falling off
8,669.0
10,850.0
11:18
12:30
beginning ^10,200', stacking negative
CWT by 10,545' lhm 10,700', pump
sweeps
Nabors depth counters sticking, dean
& spray down, reset depth to current
drilled depth of 10,650'+4' correction
(10,854)
9/28/2018
9/28/2018
2.00
PROD1
DRILL
DRLG
P
OBD, 1.8 bpm, FS = 841 psi, CWT=
10,850.0
11,111.0
12:30
14:30
12K, WOB = 1 K, BHP = 4344 psi,
WHP = 605 psi, pump 5x5 sweeps,
BHA wiper, snubbing to get back
down, mud system #3 reachest bit at
11,111', PUW = 39K, ROP = 130 fph
9/28/2018
9/28/2018
0.50
PROD1
DRILL
DRLG
P
OBD, CWT =5K, WOB =.6K, BHP=
11,111.0
11,165.0
14:30
15:00
4420 psi, WHP = 656 psi, circ = 4590
psi, 13.0 ppg @ window,
9/28/2018
9/28/2018
0.30
PROM
DRILL
TRIP
P
Wiper up-hole, PUW =39K
11,165.0
10,338.0
15:00
15:18
9/28/2018
9128/2018
0.30
PROM
DRILL
TRIP
P
Wiper in-hole, RIW = 9K
10,338.0
11,165.0
15:18
15:36
9/28/2018
9/28/2016
1.40
PROD1
DRILL
DRLG
P
OBD, 1.8 bpm, CWT= 3.5K WOB =
11,165.0
11,304.0
15:36
17:00
1.1 K, BHP = 4406 psi, WHP = 674 psi,
circ = 4666 psi
9/28/2018
9/28/2018
0.30
PROD1
DRILL
WPRT
P
250' wiper, PUW = 39 K, RIW = 9K
11,304.0
11,304.0
1700
17:18
9/28/2018
9/28/2018
4.30
PROM
DRILL
DRLG
P
CT 4615@ 1.80 bpm, Annular 4449,
11,304.0
11,545.0
17;18
21;36
Free spin 928, WH 624 psi, IA 650,
OA 200
OBD, CT WT=-7klbs, WOB 0.8k
lbs, ROP - 50 ft/hr
Drill with many pick ups, troubles
turning around and running past
11,357, pumping sweeps. PU weights
consistently 45 k lbs. added 15
Lowtorque to active system, no
noticeable change in weight transfer.
Average ROP over section = 56 R/hr
Page 16/37 ReportPrinted: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stam Depth
start Time
End Time
Dur (hr)
Phase
Dp Code
Activity Cove
Time P.T-x
OpersGon
(ftKB)
End Depth(fiKa)
9/28/2018
9/28/2018
1.10
PROD1
DRILL
WPRT
P
Wiper, PUW =45 K,
11,545.0
8,700.0
21:36
22:42
Pull wiper early, chase 5x5 sweep off
bottom, time second 5x5 just prior to
entering the build. Hole Clean w/
regard to coil weight. No WOB or
motorwork.
9/2812018
928/2018
0.20
PROD1
DRILL
DLOG
P
Tie in toRA tag for +/'correction.
8,700.0
8,726.7
22:42
22:54
9/28/2018
928/2018
0.90
PROD1
DRILL
WPRT
P
RSH, CT Wt started at 17.7 k lbs / 50
8,726.7
11,545.0
22:54
23:48
ft/min and 1 bpm.
CT Wt dropped to 8 k reduced RIH
sped to 40 ff/min
One small stack out 10,628 @ a TF
change
Clan trip in
9/28/2018
929/2018
0.20
PROM
DRILL
DRLG
P
CT46000D 1.80 bpm, Annular 4441,
11,545.0
11,550.0
23:48
00:00
Free spin 912, WH 744 psi, IA 656,
OA 205
OBD, CT WT=0klbs, WOB 0.7k
lbs, ROP 70 R/hr
Average ROP over section = 25 R/hr
9/29/2018
929/2018
1.70
PROM
DRILL
DRLG
P
CT 4600@ 1.80 bpm, Annular 4441,
11,550.0
11,584.0
0000
01:42
Free spin 912, WH 744 psi, IA 656,
OA 205
OBD, CT WT=-7klbs, WOB 0.7k
lbs, ROP 70 ft/hr
Observed influx,increased stepwise to
13.3 EMW at the window.
Struggling with weight transfer,
attempt sweeps, reduced pump rate.
Able to make 100-50 R/hr when on
bottom but WOB falls off rapidly.
Average ROP over section = 20 ft/hr
9/29/2018
9/292018
0.20
PROD1
DRILL
WPRT
P
PU, 40 klbs -200'BHA wiper
11,584.0
11,584.0
01:42
01:54
9292018
9/292018
1.60
PRODt
DRILL
DRLG
P
CT 4785 fob 1.80 bpm, Annular 4590,
11,584.0
11,655.0
01:54
03:30
Free spin 889, WH 960 psi
OBD, CT WT = -7 k Ibs, WOB 1-.2 k
lbs, ROP 100 ft/hr - when on bottom
Able to make 100-50 ft/hr when on
bottom but WOB falls off rapidly.
Add alpine beads to Hi -Ys sweep
pump 5x5
Average ROP over section = 44 ft/hr
9/29/2018
9/29/2018
0.90
PROD1
DRILL
DRLG
P
Drilling Break (off 11,660', CT Wt 5.7 k
11,655.0
11,723.0
03:30
04:24
WOB .5 k, ROP 150 - 250 R/hr, short
lived
Back to multiple pick ups for short
footage
CT Wt -7 k lbs, WOB 1-.2 k lbs, ROP
50+ while on bottom
Average ROP over section = 75 ft/hr
9/29/2018
929/2018
0.20
PROM
DRILL
WPRT
P
PU, 40 it lbs - 200' BHA wiper
11,723.0
11,723.0
04:24
04:36
9/29/2018
9/29/2016
0.80
PROD1
DRILL
DRLG
P
CT Wt -7 k lbs, WOB 1-.2 k lbs, ROP
11,723.011,744.0
04:36
0524
50+ while on bottom Pumping beads
with little effect on weight transfer
Page 17137 ReportPrinted: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
scan naPm
sted Time
ErdTM
our (hr)
Phase
op Code
AcfiWtyCade
Tm P -T -X
operafim
MR)
EM Depth(WB)
9/29/2018
9/29/2018
2.40
PROD!
DRILL
DRLG
P
OBD, 1.8 bpm, FS = 920 psi, CWT = -
11,744.0
11,863.0
05:24
07:48
5K, WOB = 0.6K, BHP = 4576 psi,
WHP = 738 psi, circ = 4900 psi,
stuggling w/ weight transfer, pumping
beaded sweeps as required, continual
PU's to continue drilling
Suspect micro -motion out drive gain
issues, break down MM out & blow
down, lititle to no improvement
9/29/2018
9/29/2018
0.20
PROM
DRILL
WPRT
P
150'wiper, PUW = 37K, RIW = 10K
11,863.0
11,863.0
07:48
08:00
9/29/2018
9/29/2018
1.10
PROD1
DRILL
DRLG
P
OBD, 1.8 bpm, FS = 948 psi, CWT =
11,863.0
11,902.0
08:00
09:06
2K, WOB = 1.2K, BHP = 4531 psi,
WHP = 603 psi, circ = 5111 psi, NBI =
97.5°, PUW's = 38K - 43K
9/29/2018
9/29/2018
0.30
PROD1
DRILL
WPRT
P
200' wiper, PUW = 39K, RIW = 11 K
11,902.0
11,902.0
09:06
09:24
9/29/2018
9/29/2018
0.40
PROD1
DRILL
DRLG
P
OBD, CWT =2K, WOB=.9K, BHP=
11,902.0
11,915.0
09:24
09:48
4516 psi, WHP = 636 psi, circ = 5036
psi, pump 5x5 sweep, difficulty drilling,
poor weight transfer
0.30
PRODi
DRILL
WPRT
P
500'wiper, PUVJ=39K, RIW=9K
11,915.0
11,915.0
10:06
9/29/2018
1.40
PROD1
DRILL
DRLG
P
OBD, 1.8 bpm, CWT = 4K (quickly
11,915.0
11,975.0
11:30
falling off), WOB =.9K, BHP = 4525
r218912912018
psi, WHP = 615 psi, circ = 4974 psi,
pumping multiple 10 bbl beaded hi -vis
pills, drill to 11,975', PUW = 35K
9/29/2018
2.70
PROD!
DRILL
DRLG
P
Unsure of TVD in structure, decision
11,975.0
12,088.0
14:12
made to drill past planned TD
(11,975), CWT = -4K, WOB = .8K,
BHP = 4560 psi,WHP = 523 psi,
pumping 10 bbl beaded pills as
required, pump 10 x 10 sweeps at
called TD of 12,088'
9/29/2018
9/29/2018
2.80
PROM
DRILL
WPRT
P
Wait for sweeps to exit bit, wiper to
12,088.0
78.0
14:12
17:00
swab, PUW = 36K, tag up
9/29/2018
9/29/2018
1.70
PROD1
DRILL
TRIP
P
RBIH
78.0
8,400.0
17:00
18:42
9/29/2018
9/29/2018
0.20
PROD1
DRILL
DLOG
P
Tie into the K1 marker for a -14.5'
8,400.0
8,433.5
18:42
18:54
correction
929/2018
912912018
0.80
PROD1
DRILL
TRIP
P
RIH to 8650'. Park and observe BHP
8,433.5
8,651.6
18:54
19:42
build to 13.52 psi
TVD 6229.76', Trap 4306 psi @ 18:56
10 min, 4356 psi, - 13.44 ppg
20 min, 4366.7 psi, 13.47 ppg
30 min, 4374.3 psi, 13.50 ppg
40 min, 4381.3 psi, 13.52 ppg
RIH after 47 min, 4381.3 psi, 13.52
PPG
9/29/2018
929/2018P1.40
PROD1
DRILL
TRIP
P
Continue to RIH, tag bottom @
8,651.6
12,090.0
19:42
21:06
12090'.
Targeting 13.7
9/29/2018
9/29/2018
PROD1
DRILL
DISP
P
Pump 49.5 bbls liner running pill to the
12,090.0
12,087.0
21:06
21:30
bit,
929/2018
929/2018
PROD1
DRILL
DISP
P
PU 35 k lbs, POOH laying in liner
12,087.0
8,629.0
21:30
22:48
running pill, new mud W/2&2% lubes
plus 2 ppb Alpine beads. Paint Yellow
TD flag @ 10467.94'
Pull through window, clean
Page 18137 ReportPrinted: 10115/2018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
SW Time
End Time
our (hr)
Phase
Op Code
Actively Code
Time P-T-X
Operation
(flKe)
End Deph(RKB)
9/2912018
9/30/2018
1.20
PROM
DRILL
TRIP
P
Continue out of hole,
8,629.0
2,287.0
22:48
00:00
""TOL running pill 8,100'
Paint White window flag @ 6978.30'
Continue to POOH, slow pulling speed
to 35 fi/min passing Orbit valve @
1.75 bpm, spinning the bit, up down ,
up passes, continue out of hole.
9/30/2018
9/30/2018
0.40
PROD1
DRILL
TRIP
P
Continue out of hole. Park, SID
2,287.0
399.0
00:00
00:24
pumps, trap pressure, WH @1895 psi,
Fell to 1572 psi.
9/30/2018
9/30/2018
0.70
PRODI
DRILL
TRIP
P
Shut Orbit valve, bleed wellhead to
399.0
93.0
00:24
01:06
zero, continued out of hole, bleed
down at the stack, bleed pressure at
the pumps, OWFF while PJSM.
9/30/2018
9/30/2018
1.50
COMPZI
DRILL
PULD
P
Pop off, inspect pipe, minor flat spot-
93.0
0.0
01:06
02:36
8' back from CC, 0.168", measure 4
way as prescribed at 12' back from the
connector. All 0.203". LD BHA# 15
over a closed orbit valve. Inspect and
torque reel / saddle clamp bolts. Blow
down and snake Out MM.
9/30/2018
9/30/2018
0.60
COMPZI
CASING
PUTB
P
Clear/ clean dg floor, prep liner
93.0
0.0
02:36
03:12
running equipment. PJSM
9/30/2018
9/30/2018
2.30
COMM
CASING
PUTB
P
PU iL-03 lower completion, run #1.
0.0
1,650.0
03:12
05:30
54 joints 4.6 Ib/ft slotted ST-L liner
over a non-ported bull nose topped
with a shorty deployment sleeve, LOA
(1651.20')
Had to fight the drift through joint #3.
Vacuuming down stack as it fills,
verifying no flow from well. Notice
leak from drawworks platform, inspect,
call kick while running liner drill. AAR -
32 joints in the hole -
9/30/2018
9/30/2016
0.40
COMPZI
CASING
RGRP
P
Sit on safety joint staged in hole.
0.0
960.0
05:30
05:54
Waiting on mechanic who's behind
les rig move, to inspect hydraulic leak
9/30/2018
9/30/2018
1.60
COMPZI
CASING
PUTB
P
Crew change, continue PU liner (w/ 32
960.0
1,650.0
05:54
07:30
in the hole), clear floor
9/30/2018
9/30/2018
0.70
COMPZt
CASING
PULD
P
PU liner running tools, BHA#16, skid
1,650.0
1,695.0
07:30
08:12
in cart, MU to coil, tag up, set
counters, equalize above orbit valve
(1600 psi), open orbit valve (7th cycle)
9/30/2018
9/30/2018
2.70
COMPZI
CASING
RUNL
P
RIH w/ liner run #1, clean past orbit
1,695.0
12,090.0
08:12
10:54
valve, -18.1 correction to window flag,
log K1 for 0' correction, 39K PUW @
window, arrive at TD, PUW = 41 K,
RBIH, bring up pumps, release off
liner, PUW = 33K, TOL -10,439'
9/30/2018
9/30/2018
2.70
COMPZI
CASING
TRIP
P
POOH, pumpng across the top until
12,090.0
44.0
10:54
13:36
window (to not displace LRP), pump
down coil once through the window,
paint EDP flags, close orbit valve &
bleed off WHP (13.6 ppg shedule
gives-1600 psi WHIP), open EDC
9/30/2018
9/30/2018
0.40
COMPZI
CASING
PULD
P
PJSM„floes-check well, good, LD BHA
44.0
0.0
13:36
14:00
#16
9/30/2018
9/30/2018
0.90
COMPZI
CASING
PUTB
P
PU liner (Ported BN, 16 jnts slotted
0.0
475.0
14:00
14:54
1
1
1
1
liner, OH anchor & billet)
9/30/2018
9/30/2018
0.80
COMPZI
CASING
PULD
P
PU liner running tools, BHA#17, slide
14:54
15:42
in cart, MU to coil, tag up, set
counters, equalize above orbit valve,
7r7
open orbit valve (cycle #8)
Page 19137 ReportPrinted: 1011512018
Summary (with Timelog Depths)
31-01
lipOperations
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
S an Depth
Start Time
EMTme
Dur(hr)
Phase
Op CMe
ACWHY CMa
Tma P-T-x
Operation
(fti(a)
EM Depth We)
9/30/2018
9/30/2018
1.50
COMPZ1
CASING
RUNL
P
RIHw/BHA#171inermn#2, pre-load
550.0
8,535.0
15:42
17:12
DS PDL, correct to window flag for a -
20.7', PUW = 32K, Gose EDC
9/30/2018
9/30/2018
0.80
COMPZ1
CASING
RUNL
P
Continue to RIH, drive by Log K1 for
8,535.0
10,431.0
17:12
18:00
zero correction. Set on depth, slips
oriented 180 ° ROHS.
"'TOL 9950'
9/30/2018
9/30/2018
2.20
COMPZ1
CASING
TRIP
P
POOH
10,431.0
41.0
18:00
20:12
9/30/2018
9/30/2018
1.30
COMPZ1
CASING
PULD
P
Bump up, space out, PUD, BHA# 17,
41.0
0.0
20:12
21:30
1 LD same.
9/30/2018
9/30/2018
0.70
PROD2
STK
BOPE
P
Perform BOP function test.
0.0
0.0
21:30
22:12
9/30/2018
10/1/2018
1.80
PROW
STK
CTOP
P
Cut back coil to remove flat spot. Re-
0.0
0.0
22:12
00:00
install coil connector, pull test to 3.5 k
lbs
""Cut 19' of coil
10/1/2018
10/1/2018
2.00
PROD2
STK
CTOP
P
Cut one more foot of coil, reinstall CC,
0.0
0.0
00:00
02:00
pull test to 3.5 k lbs, Rehead, test
wire, good, 61.4 / 1400 ohms, PT to
4000 psi. Bleed down.
" cut 1' foot of coil.
10/1/2018
10/1/2018
1.40
PROW
STK
PULD
P
PU & PD BHA#18, Li-04 lateral
0.0
75.0
02:00
03:24
drilling assembly, skid cart, stab on,
check and replace pack offs, bump up,
set counters,
10/1/2018
10/1/2018
1.70
PROD2
STK
TRIP
P
RIH W BHA#18
75.0
8,400.0
03:24
05:06
Shallow test agitator, continue to RIH.
rale(bpm) Diff press(psi)
1.0 165
1.5 825
2.0 1178
10/1/2018
10/1/2018
0.20
PROD2
STK
DLOG
P
Tie into the K1 marker for -20'
8,400.0
8,432.7
05:06
05:18
correction
10/1/2018
10/1/2018
1.00
PROD2
STK
TRIP
P
Continue to RIH, dry tag TOB @ 9948,
8,432.7
9,947.8
05:18
06:18
PUH, bring up rate, RBIH, observe
1726 psi dp over tools @ 1.7 bpm, dp
drops to expected levels (-1300 psi
FS)
10/1/2018
10/1/2018
1.20
PROD2
STK
KOST
P
Begin milling off billet, oriented 210°
9,947.8
9,948.8
0618
07:30
ROHS, 1 fph for 1', stall getting
started, PUW = 38K, stall second time
getting started
FS = 1169 psi @ 1.7 bpm, BHP =
4526 psi, WHP = 823 psi, WT = 15K,
WOB fell off, no motorwork, contiunue
w/ shedule
10/1/2018
10/1/2018
0.50
PROD2
STK
KOST
P
2 fph for 1', little to no WOB, CWT
9,948.8
9,949.8
07:30
08:00
stacking ( from -14.5K to 7.5K over
first 1') continue with schedule
10/1/2018
10/1/2018
0.30
PROW
STK
KOST
P
3 fph for 1', CWT=-5.3K, WOB
9,949.8
9,950.0
08:00
08:18
= .03K, contnue stacking CWT to
2.6K, CWT lets go, stall 9950.3', PUW
= 38K, observiing no aluminum over
shakers
1011/2018
10/1/2018
0.90
PROD2
STK
KOST
P
PUH, pump sweeps, RBIH to verify
9,950.0
9,947.6
08:18
09:12
depth, FS = 1070 psi, ease in tenths to
find WOB, see weight @ 9948.6', stall,
PUW = 42K, continue working to get
started on billet, stall @ 9947.6'
Page 20137 ReportPrinted: 10/1512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
stance"
Starr Time I
End Time
our (hr)
Phase
Op Code
Aawty Code
Ime P -T -X
Operation
(ftKB)
End OepM MKB)
10/112018
10/1/2018
2.00
PROD2
STK
TRIP
T
Confer w/ town POOH to PU NOV
9,947.6
78.0
09:12
11:12
agitator atop same Iron Horse motor,
open EDC
10/1/2018
10/1/2018
1.20
PROD2
STK
TO -LD
T
PJSM, PUD BHA#18 (cross -training),
78.0
0.0
11:12
12:24
pull motor, break off bit, blow down
with air, motor appears functional
10/1/2018
10/1/2018
1.10
PROD2
STK
PULD
T
Begin PD BHA#19 L1-04 KO/Lat
0.0
0.0
12:24
13:30
Assembly (NOV agitator, 0,5` AKO
Iron Side motor, RB P104 bit), bit
came out a 1-2 (1 chipped reamer
cutter & 2 plugged nozzles), observe
rubber plugging nozzle, decisioin
made to stop PD, pull motor OOH,
PUD BHA#19
Confer w/ town decison made to PU
55 hr X-Treme motor & 55 hr agitator
(tools from L1-03 lateral)
10/112018
1.50
PROD2
STK
PULD
T
PD BHA#19 (NOV agitator, 0.5° AKO
0.0
78.0
13:30
15:00
X-Treme motor, RB P104 bit), slide in
110/1/2018
cart, MU coil, check pack -offs, tag up,
Pet counters
10/1/2018
10/1/2018
1.80
PROD2
STK
TRIP
T
RIH w/BHA#19, shallow test at 517',
78.0
8,400.0
15:00
16:48
1.8 bpm, FS = 943 psi, good vibration,
captured screens shots of transducer
output, FS = 943 psi, bore = 2411 psi,
circ = 4937 psi
Perform multiple tests to aquire
agitator data via Baker transducer
(Results on S: drive under
photographs for 31-01), EDC closed
10/1/2018
0.10
PROD2
STK
DLOG
T
Log Kt for -20' correction
8,400.0
8,423.0
16:54
10/1/2018
1.10
PROD2
STK
TRIP
T
Continue RIH, PUW = 40K @ window,
8,423.0
9,946.4
18:00
counters not in agreement,
r16:54
troubleshoot, set down @ 8693', dry
tag TOB at 9949.8'
10/172018
0.90
PROD2
STK
KOST
P
Milling off billet, 1 fph for 1'm, CWT
9,9484
9,949.4
18:54
=15.7K, WOB on falls off
10/1/2018
0.50
PROD2
STK
KOST
P
Go to 2 fph for 1'
9,949.4
9,950.4
18:54
19:24
10/1/2018
10/1/2018
0.30
PROD2
STK
KOST
P
Go to 3 fph for V
9,950.4
9,951.4
19:24
19:42
10/1/2018
10/1/2018
1.00
PROD2
STK
KOST
P
Control drill 3-10 fph until 10' in (past
9,951.4
9,961.4
19:42
20:42
1
slips) per DD
10/1/2018
10/1/2018
1.30
PROD2
DRILL
DRLG
P
Off billet drilling ahead, 1.8 bpm, CWT
9,961.4
10,151.0
20:42
22:00
= 13K, WOB = 1.4K, BHP = 4613 psi,
WHP = 788 psi, circ = 5502 psi
10/1/2018
10/1/2018
0.50
PROD2
DRILL
WPRT
P
PUW = 39K, dry drift billet area up &
10,151.0
10,151.0
22:00
22:30
down, clean
Capture off bottom screens of agitator
frequency at 1.65 & 1.9 bpm (70 & 80
gpm)
10/112018
10/1/2018
1.30
PROD2
DRILL
DRLG
P
OBD, 1.8 bpm, FS = 1000 psi, CWT =
10,151.0
10,350.0
22:30
23:48
13k, WOB = 1.3K, BHP = 4591 psi,
WHP = 758 psi, pumps sweeps, ROP
= 153 fph
10/1/2018
10/2/2018
0.20
PROD2
DRILL
WPRT
P
PU 40 k lbs, wiper trip number 1
10,350.0
9,750.0
23:48
00:00
10/2/2018
10/2/2018
0.10
PROD2
DRILL
WPRT
P
Continue wiper up -hole - Wiper #1
9,750.0
9,552.0
00:00
00:06
Page 21137 ReportPrinted: 10/1572018
Operations Summary (with Timelog Depths)
31-01
R ♦
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SW Depth
Start Time
End Time
Dur(hr)
Phase
up Code
Activity Code
Time P -T -X
operation
(NCB)
EM Depth (W.13)
10/2/2018
10/212018
0.30
PROD2
DRILL
WPRT
P
RBIH - RIHWt 14 k lbs
9,552.0
10,350.0
00:06
00:24
10/2/2018
10/2/2018
2.10
PROD2
DRILL
DRLG
P
CT 5314 psi @ 1.80 bpm, Annular
10,350.0
10,750.0
00:24
02:30
4599 psi, Free spin 934 psi, WH 700
psi. IA649 psi, OA 197 psi. OBD, CT
Wt 4 k lbs, WOB 2.2 k Ibs, ROP 190
Whir
10,572 PU 40 k Itis
10,573' PU 41 k Itis
10,684 PU 47k lbs - let drill off to
rotate TF, sat to log
Targeting 13.7 ppg @ the window,
setting 13.8 pg - pushing away 2.5
bbls per hr.
Average ROP over interval - 190 It/hr
10/2/2018
10/2/2018
0.20
PROD2
DRILL
WPRT
P
PU 42 k lbs, wiper #2
10,750.0
9,975.0
02:30
02:42
32 k lbs, dean pulling, good hole
10/2/2018
10/22018
0.20
PROD2
DRILL
WPRT
P
RBIH - RIHWt 12 k Ibs - clean
9,975.0
10,750.0
02:42
02:54
10/2/2018
10/2/2018
3.50
PROD2
DRILL
DRLG
P
CT 5284 psi @ 1.79 bpm, Annular
10,750.0
11,151.0
02:54
06:24
4712 psi, Free spin 880 psi, WH 723
psi. OBD, CT Wt 7 k lbs, WOB 1.5 k
lbs, ROP 1901Uhr
10,990 PU 42 k lbs - PU as 5x5 exited
midway to scheduled wiper
Average ROP over interval - 114 ft/hr
102/2018
10/212018
0.90
PROD2
DRILL
WPRT
P
PU 41 k Ibs, wiper #3 to the window
10,750.0
8,700.0
06:24
07:18
for tie in
35-32 k lbs, clean pulling, good hole
Billet clean
1022018
10/2/2018
0.10
PROD2
DRILL
DLOG
P
Tie into the RA tag for a +4' correction
8,700.0
8,725.0
07:18
07:24
10/22018
10/22018
0.80
PROD2
DRILL
WPRT
P
RBIH
8,725.0
11,151.0
07:24
08:12
Billet clean
10/22018
10/22018
3.90
PROD2
DRILL
DRLG
P
CT 5300 psi @ 1.80 bpm, Annular
11,151.0
11,430.0
08:12
12:06
4689 psi, Free spin 872 psi, WH 692
psi. OBD, CT Wt k lbs, WOB 1.9 k
lbs, ROP 120 Whir
PU 11302' 38k Itis
Start mud swap to system # 4
PU 11389'44 Ibs, 47k, & 47k, in
something hard, pulled 200' for restart,
running out of push. New mud going
down hole @12:07 and 11430'
targeting 13.7 ppg a the window,
holding 13.6 ppg, pushing away -1.5
Whir
Average ROP over interval - 71 Whir
10/212018
102/2018
0.30
PROD2
DRILL
WPRT
P
PU 45 k Itis, early wiper # 1 - 500'
11,430.0
10,930.0
12:06
12:24
1
I
I
10/212018
10/22018
0.20
PROD2
DRILL
WPRT
P
RBIH
10,930.0
11,430.0
12:24
12:36
1
I
Pumping new mud
1
Page 22/37 ReportPrinted: 1 011 512 01 8
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan DepM
Stan Time
End rime
our (hr)
Phase
Op Code
Activity Code
Time P -T -x
Operation
(flKB)
End DepM (ftKe)
10/2/2018
10/2/2018
3.00
PROD2
DRILL
DRLG
P
CT 4946 psi @ 1.79 bpm, annular
11,430.0
11,605.0
12:36
15:36
4738 psi, Free spin 894 psi, WH 751
psi. OBD, CT Wt 2 k lbs, WOB 1.8 k
lbs, ROP 150 ft/hr
PU 11510' 40 k lbs
"' New mud at the bit 11430'.
Stmgle to drill, pump 10x10 lube pill
1&1% 776 ans low torque, drilling
break then fall off as sweep came out
backside. Added 1 % low torque to
active. Good effect.
targeting 13.7 ppg a the window,
holding 13.6 ppg, pushing away -1.5
bbVhr
Average ROP over interval -58 ft/hr
10/2/2018
10/2/2018
1.80
PROD2
DRILL
DRLG
P
OBD, CT Wt 1 k lbs, WOB 1.7 k lbs,
11,605.0
11,745.0
15:36
17:24
ROP 150 ft/hr
PU 11676' 47 k lbs
targeting 13.7 ppg a the window,
holding 13.6 ppg, pushing away -1.5
bbl
10/2/2018
10/2/2018
2.00
PROD2
DRILL
DRLG
P
OBD, 1.78 bpm at 5,056 FS, Diff -910
11,745.0
11,810.0
17:24
19:24
psi, WHP=810, BHP=4,725, IA=652,
OA=201
10/2/2018
10/2/2018
0.30
PROD2
DRILL
WPRT
P
Wiper up hole (11,000)
11,810.0
10,810.0
19:24
19:42
10/2/2018
10/2/2018
0.30
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW=9.0 k
10,810.0
11,810.0
19:42
20:00
10/2/2018
10/2/2018
1.70
PROD2
DRILL
DRLG
P
BOBD, 1.78 bpm at 5,056 FS,
11,810.0
11,924.0
20:00
21:42
Diff=910, WHP=823, BHP=4,731,
IA=652, OA=201
10/2/2018
10/2/2018
0.20
PROD2
DRILL
WPRT
P
Wiper up hole (200'), struggling with
11,924.0
11,724.0
21:42
21:54
weight transfer
10/212018
10/2/2018
0.20
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW=9.0 k
11,724.0
11,924.0
21:54
22:08
10/212018
10/3/2018
1.90
PROD2
DRILL
DRLG
P
BOBD, 1.78 bpm at 5,056 FS,
11,924.0
12,027.0
22:06
00:00
Di"- 10, WHP=823, BHP=4,731,
IA=652, OA=201
- Note: Add beads to high vis pit, drill
ahead pumping 10 bbl beaded
sweeps.
10/3/2018
10/3/2018
3.00
PROD2
DRILL
DRLG
P
OBD, 1.77 bpm at 5,169 psi FS,
12,027.0
12,130.0
00:00
03:00
Diff --875 psi, WHP=730, BHP=4,759,
IA=656, OA=205
"` Note: Pumping 1 0x1 0 beaded
sweeps
10/3/2018
10/3/2018
3.30
FROM
DRILL
WPRT
P
TD lateral, PUW 40.0 k, pump wiper to
12,130.0
50.0
03:00
06:18
1
1
the window chasing 10x10 sweep
10/3/2018
10/3/2018
1.50
PROD2
DRILL
TRIP
P
Bump up, set counters, RBIH.
50.0
8,400.0
06:18
07:48
10/3/2018
10/3/2018
0.30
PROD2
DRILL
DLOG
P
Tie mo to K1 for a -21' correction.
8,400.0
8,426.2
07:48
08:06
1
I
1
Page 23137 ReportPrinted: 10/15/2018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Siert Depth
Stan Time
End Time
our(hr)
Phase
Op Code
Activity Code
Time P -T -X
operation
(W11)
End Depth(flKB)
10/3/2018
10/3/2018
0.40
PROD2
DRILL
TRIP
P
PU 36 k lbs, RIH and park at 8670'
8,426.2
8,670.0
08:06
08:30
CTMD, 6243.42 TVD,
measure bottom hole pressure.
Trap 4430.7 psi, observe pressure
bleed to 4424.1 - 13.65 to 13.62 ppg
EMW
Open choke and bleed annular to
4365.3 psi - 13.45 ppg EWM
time(mm) press (psi) EMW (ppg)
5 4414 13.6
10 4415 13.6
15 4419 13.6
10/3/2018
10/3/2018
1.50
PROD2
DRILL
TRIP
P
Continue to RIH, Window and billet
8,670.0
12,133.0
08:30
10:00
both clean
CT Wt 17k @ 50 ft/min, weight fell off
below 11,400' reduced RIH speed
Send liner running pill
Reduced RIH speed to 16 ft/min and
utalized beaded Inerr running pill to
reach bottom.
10/3/2018
10/3/2018
3.20
PROD2
DRILL
TRIP
P
Pu 38 k lbs, POOH painting flags and
12,133.0
62.0
10:00
13:12
laying in liner running pills.
Yellow TD flag - 10863.53'
White window flag 7278.29'
"'top of liner running pill 7900'
Park @ 3492', Gose Orbit valve, bleed
down.
Continue out of hole
10/3/2018
10/3/2018
1.30
PROD2
DRILL
PULD
P
Flow check while holding PJSM.
62.0
0.0
13:12
14:30
Inspect pipe, Found gouges in pipe
from gripper block, appears to be from
bump up @ 6:16 am 10/3/18.
Measured pipe at 12' back from coil
connecter, 0.210" DS, 0.210 DS,
0.199 reel side, 0.219 Wall side.
LD BHA#20 over a closed orbit valve.
10/3/2018
10/3/2018
0.30
COMPZ2
CASING
PUTB
P
Clean and prep floor to run liner
0.0
0.0
14:30
14:46
10/3/2016
10/3/2018
0.50
COMPZ2
CASING
PUTB
P
PU/MU L1-04 completion, run #1, 42
0.0
510.0
14:48
15:18
joints 2-3/8" STL 4.6#/ft slotted liner
over a no -ported bull nose and under
a shorty deployment sleeve.
10/3/2018
10/3/2018
1.00
COMPZ2
CASING
PUTS
P
@ 17 joints away. Alerted to diesel
510.0
510.0
15:18
16:18
spill at front of rig. Picked up safety
joint then floor crew responded to the
diesel spill.
10/3/2018
10/3/2018
1.20
COMPZ2
CASING
PUTS
P
continue to PU/MU Ll -04 completion,
510.0
1,297.0
16:18
17:30
run #1, 42 joints 2-3/8" STL 4.6#/ft
slotted liner over a no -ported bull nose
and under a shorty deployment
sleeve.
10/3/2018
10/3/2018
1.00
COMPZ2
CASING
PULD
P
PU BHA
1,297.0
1,343.0
17:30
18:30
10/3/2018
10/3/2018
0.50
COMPZ2
CASING
PULD
P
Check pac-offs (good), change out
1,343.0
1,343.0
18:30
19:00
UOC float valves
10/3/2018
10/3/2018
1.50
COMPZ2
CASING
RUNL
P
RIH with AL -04 first liner segment
1,343.0
8,543.0
19:00
20:30
10/3/2018
10/3/2018
0.15
COMPZ2
CASING
RUNL
P
Correct to the EDP flag correction of
8,543.0
8,543.0
20:30
20:39
Minus 25.12'
10/3/2016
10/3/2018
0.50
COMPZ2
CASING
RUNL
P
Continue RIH
8,543.0
9,675.0
20:39
21:09
10/3/2018
10/3/2018
0.20
COMPZ2
CASING
RUNL
P
Log the K1 correction plus 4.5', PUW
9,675.0
9,675.0
21:09
21:21 1
41 k
Page 24137 Report Printed: 1 0/1 512 01 8
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Lag
Start Depth
startTime
EM Time
Dur(hn
Phase
Op Code
Activity Cote
Time P -T -X
operation
(nKB)
End Depth (MR)
10/3/2018
10/3/2018
0.60
COMPZ2
CASING
RUNL
P
Continue IH
9,675.0
12,133.0
21:21
21:57
1013/2018
10/3/2018
0.30
COMPZ2
CASING
RUNL
P
Set down 3.0 k, bring pump online,
12,133.0
10,822.6
21:57
22:15
1.25 bpm in and 1.25 bpm out, (592
psi/diff), PUW 36 k, remove liner
length from counters,
- Note: Pushed away 6 bbls on trip
in the hole.
10/312018
101412018
1.75
COMM
CASING
TRIP
P
Lined up across the lop, PUH to
10,822.6
4,232.0
22:15
00:00
7,900'. line back up down the coil,
continue POOH
10/4/2018
10/412018
0.75
COMM
CASING
TRIP
P
Continue POOH
4,232.0
44-2-
00:00
00:45
10/4/2016
10/4/2018
0.20
COMPZ2
CASING
TRIP
P
Function dosed Orbit valve (1,600 psi
44.2
44.2
00:45
00:57
below)
10/4/2018
101412018
0.25
COMPZ2
CASING
OWFF
P
Check well for flow (no -flow)
44.2
44.2
00:57
01:12
1014/2018
1014/2018
0.30
COMPZ2
CASING
PULD
T
LD setting tools, found liner at surface.
44.2
0.0
01:12
01:30
1014/2018
1014/2018
0.20
COMPZ2
CASING
PULD
T
Stand back CoilTrak tools, Break off
0.0
0.0
01:30
01:42
and inspect GS (good)
1014/2018
1014/2018
0.25
COMM
CASING
PULD
T
MU setting tools
0.0
1,343.0
01:42
01:57
1014/2018
10/4/2018
1.50
COMM
CASING
RUNL
T
RIH, with lower liner segment take#2
1,343.0
8,542.0
01:57
03:27
10/4/2018
10/4/2018
0.15
COMM
CASING
RUNL
T
Correct to the EOP flag (minus 24.8'),
8,542.0
8,542.0
03:27
03:36
PUW 40 k
1014/2018
10/4/2018
0.38
COMPZ2
CASING
RUNL
T
Continue IH
8,542.0
9,672.0
03:36
03:58
10/4/2018
10/4/2018
0.15
COMPZ2
CASING
RUNL
T
Log the Kt marker correction (plus
9,672.0
9,707.0
03:58
04:07
4.0)
10/4/2018
10/4/2018
0.75
COMPZ2
CASING
RUNL
T
Continue IH
9,707.0
12,133.0
04:07
04:52
10/4/2018
10/4/2018
0.20
COMPZ2
CASING
RUNL
T
Set down 3.7 k DHWOB, PUW 41 k,
12,133.0
10,810.0
04:52
05:04
set back down 3.78 k COMB, bring
pump online, 1.39 bpm (891 psi/diff),
PUW 35 k, minus 1.0 k, remove liner
length from counters,
*** Note: Pushed away 6 bbls on trip
in the hole.
10/4/2018
10/4/2018
2.30
COMM
CASING
TRIP
P
POOH, @ surface, 15134 psi WH
10,810.0
52.0
05:04
07:22
prior to closing the orbit valve star of
10th cycle, PJSM.
10/4/2018
10/4/2018
0.40
COMPZ2
CASING
PULD
P
Flow check, unstab injector, LD BHA#
52.0
0.0
07:22
07:46
21
1014/2018
10/4/2018
0.30
COMPZ2
CASING
PUTB
P
Clear floor and prep for Tuning liner
0.0
0.0
07:46
08:04
10/4/2018
10/4/2018
2.00
COMM
CASING
PUTB
P
Pick up upper L1-03 completion
0.0
1,500.3
08:04
10:04
( run#2), 48 joints under an alminum
liner top billet, LOA 1500.25'.
10/4/2018
10/4/2018
0.50
COMM
CASING
PULD
P
PU BA#22, stab on, bump up and set
1,500.3
1,544.5
10:04
10:34
counters. equalize to 1673 psi,
Open Orbit valve, Cycle #10,
10/4/2018
10/4/2018
1.00
COMPZ2
CASING
RUNL
P
RIH
1,544.5
7,775.0
10:34
11:34
10/4/2018
10/4/2018
0.20
COMPZ2
CASING
CLOG
P
Large tie in at window flag, -57.5'.
7,775.0
7,775.0
11:34
11:46
Inspect counters, clean, arbitrarily
correct to -20' as per typical and roll in
hole.
Page 25137 Report Printed: 10/1512018,
® -- Operations Summary (with Timelog Depths)
31-01
• w
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan DepM
I
stall Time
End Time
Dur (h)
Phaso
Op Code
Acd ity Code
Time P -T -X
Operation
(ftKB)
End DepM (XKB)
10/412018
1014/2018
0.60
COMM
CASING
RUNL
P
Continue to RIH.
7,775.0
9,885.0
11:46
12:22
PU Wt 36 k @ 8640-
101412018
10/4/2018
0.10
COMPZ2
CASING
DLOG
P
Tie into Kt for 0' correction.
9,885.0
9,910.6-
12:22
12:28
10/412018
10/4/2018
0.40
COMPZ2
CASING
RUNL
P
Continue to RIH, tag up, 10834, SID
9,910.0
10,834.0
12:26
12:52
3.6 k lbs, PU 43 k lbs, - 6.8 k Ib WOB,
RBIH, SID 3.8 k lbs, Onlne w pump,
1.63 bpm, 901 psi,diff, PU 34 k lbs & -
1.54 k lbs WOB
***Set liner on depth TOB @ 9334',
reset counters.
10/4/2018
101412018
1.90
COMM
CASING
TRIP
P
POOH, park @ 500', open EDC.
10,834.0
23.7
12:52
14:46
Continue to POOH. -
10/4/2018
101412018
1.00
COMM
CASING
TRIP
P
At surface, bump up, speace out, WH
23.7
0.0
14:46
15:46
1590 psi, A 622 psi, OA 186 psi.
PUD BHA#22.
10/412018
10/4/2018
1.22
PRODS
STK
CTOP
P
Pipe management, Open hot work
0.0
0.0
15:46
17:00
permit, remove upper quick, boot wire,
install nozzle, pump slack back, un
stab, rig up hydraulic cutter,
10/4/2018
10/4/2018
2.00
PRODS
STK
CTOP
P
Trim coil finding wire @ 18', continue
0.0
0.0
17:00
19:00
trimming coil 500'
••• 13,240' Coil Length......
10/4/2018
1014/2018
0.30
PROD3
STK
CTOP
P
Install CTC, pull test 35 k
0.0
0.0
19:00
19:16
10/4/2018
10/412018
0.50
PRODS
STK
CTOP
P
Re -head BHI upper quick,
0.0
0.0
19:18
19:48
>2000/58mohms, PT 4,000 psi (good -
test)
10/4/2018
10/4/2018
0.50
PRODS
STK
CTOP
P
Stab INJH, pump slack forward
0.0
0.0
19:48
20:18
10/412018
1014/2018
1.00
PRODS
STK
PULD
P
Break off INJH, PU/PD kickoff/drilling
0.0
78.3
20:18
21:18
BHA#23
10/4/2018
10/412018
0.40
PRODS
STK
PULD
P
Surface test Coiltrak tools (good -test),
78.3
78.3
21:18
21:42
tag up reset counters, bring WHIP upto
1,700 psi, function open the orbit
valve.
10/4/2018
101412018
1.75
PRODS
STK
TRIP
P
RIH
78.3
8,400.0
21:42
23:27
10/4/2018
10/4/2018
0.20
PRODS
STK
DLOG
P
Log the Kt correction minus 20.5'
8,400.0
6,442.0
23:27
23:39
10/4/2018
10/5/2018
0.35
PRODS
STK
TRIP
P
Continue IH
8,442.0
9,311.0
23:39
00:00
10/5/2018
10/5/2018
0.10
PRODS
STK
TRIP
P
Continue IH, shutdown pump, dry tag
9,311.0
9,330.0
00:00
00:06
TOB @ 9,330', PUW 36 k
10/5/2018
10/5/2018
0.15
PRODS
STK
TRIP
P
PUH, bring pump online, obtain
9,330.0
9,328.4
00:06
00:15
parameters, 1.78 bpm at5,442 psi FS,
Diff -1,412, WHP=770, BHP=4,619
1015/2018
10/5/2018
0.75
PRODS
STK
KOST
P
Kick off billet as per RP @ 1 fph
9,328.4
9,329.4
00:15
01:00
10/5/2018
10/5/2018
0.50
PROD3
STK
KOST
P
Increase ROP to 2 fph
9,329.4
9,330.1
01:00
01:30
10/5/2018
10/5/2018
0.50
PRODS
STK
KOST
P
Increase ROP to 3 fph
9,330.1
9,331.0
01:30
02:00
10/512018
10/5/2018
0.35
PRODS
STK
KOST
P
Increase 7-10 fph targeting 1.0 k
9,331.0
9,339.0
02:00
02:21
DHWOB
10/5/2018
101512018
1.00
PRODS
DRILL
DRLG
P
Drill ahead, 1.80 bpm at 5,816 psi,
9,339.0
9,491.0
02:21
03:21
WHP=434, BHP=4,572, IA=639,
OA=190
10/5/2018
1015/2018
0.15
PRODS
DRILL
WPRT
P
PUH for dry drift KOP, slight bobble
9,491.0
9,300.0
03:21
03:30
(200 lbs)
Page 26137 ReportPrinted: 10/1512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Si T{me
End Tune
Dur(hr)
Phase
Op Core
A WyCode
Time P -T -x
Operation
(NCB)
EM Depth(ftKB)
10/5/2018
1015/2018
0.15
PRODS
DRILL
WPRT
P
RBIH, past KOP (dean)
9,300.0
9,458.0
03:30
03:39
10/5/2018
10/5/2018
0.15
PRODS
DRILL
WPRT
P
Perform Check shot @ 9,458'
9,458.0
9,458.0
03:39
03:48
10/5/2018
10/5/2018
0.15
PRODS
DRILL
WPRT
P
Continue IH, Perform check shot
9,458.0
9,488.0
03:48
03:57
10/5/2018
10/5/2018
1.60
PRODS
DRILL
DRLG
P
BOBD, 1.60 bpm at 5,454 psi FS,
9,488.0
9,735.0
03:57
05:33
Diff=1399, WHP=623, BHP=4,600,
IA=640, OA=192, pump 5X5 sweep,
timed out with pending wiper.
10/5/2018
10/5/2018
0.20
PROD3
DRILL
WPRT
P
PU Wt 38 k Itis, wiper#1 -400'
9,735.0
9,364.0
05:33
05:45
10/5/2018
10/5/2018
0.20
PROD3
DRILL
WPRT
P
RBIH from wiper#1
9,364.0
9,735.0
05:45
05:57
1015/2018
10/5/2018
1.00
PRODS
DRILL
DRLG
P
CT 5302 psi @ 1.81 bpm, Annular
9,735.0
9,859.0
05:57
06:57
4563 psi,Free spin off 1331 psi, WH
631, IA 644, OA 195
BOBD, CT Wt 10 k Itis, WOB 2.8 k lbs,
ROP 130 fflhr
Average ROP over interval 124 ft/hr
10/5/2018
10/5/2018
0.50
PRODS
DRILL
WPRT
P
PU 41k lbs, WOB fell off, noticed
9,859.0
9,859.0
06:57
07:27
baker screen had locked up.
Continued to PU while
troubleshooting. rectified, RBIH
10/5/2018
10/512018
1.20
PRODS
DRILL
DRLG
P
CT 5420 psi @ 1.81 bpm, Annular
9,859.0
10,155.0
07:27
08:39
4565 psi,Free spin diff 1412 psi,
BOBD, CT Wt 11 k Itis, WOB 1.8k Ibs,
ROP 200 ft/hr
Average ROP over interval 247 ft/hr
10/5/2018
10/5/2018
0.30
PRODS
DRILL
WPRT
P
PU Wt 36 lbs - Wiper #2 - 800'
10,155.0
9,373.0
08:39
08:57
'" Note have beads in our high vis
sweep left over from liner running pill
10/5/2018
10/5/2018
0.30
PRODS
DRILL
WPRT
P
RBIH - RIH Wt 14 k Ibis
9,373.0
10,155.0
08:57
09:15
10/5/2018
10/5/2018
2.70
PRODS
DRILL
DRLG
P
CT 5458 psi @ 1.81 bpm, annular
10,155.0
10,550.0
09:15
11:57
4633 psi,Free spin dif 1447 psi, WH
683 psi
BOBD, CT Wt 7 k lbs, WOB 2.2 k lbs,
ROP 100 ft/hr
10,299 PU Wt 37 k Itis - free spin
1,471 psi
10,350 PU Wt 40 k Itis - free spin
1,396 psi
Time out 5x5 sweep for wiper
Average ROP over interval 146 ft/hr
10/5/2018
10/5/2018
0.70
PRODS
DRILL
WPRT
P
PU Wt 38 lbs - Wiper #3 -to window
10,550.0
8,685.0
11:57
12:39
for tie in
Billet clean
Inadvertently came up through the
window and back down through it with
pumps on, neg and pos WOB spikes,
motor did not torque up though.
10/5/2018
10/5/2018
0.20
PRODS
DRILL
OLOG
P
Tie into RA tag for a +4' correction
8,685.0
8,729.6
12:39
12:51
10/5/2018
10/5/2018
0.60
PROD3
DRILL
TRIP
P
RBIH, billet clean
8,729.6
10,550.0
12:51
13:27
Page 27137 ReportPrinted: 1 011 512 01 8
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SW Depth
Start Time
End Time
our (hr)
Phase
op code
Aedvdy Cade
Time P -T -x
operedon
(ftKe)
End Depm(N(B)
1015/2018
10/5/2018
3.50
PROD3
DRILL
DRLG
P
CT 5378 psi @ 1.79 bpm, annular
10,550.0
10,882.0
1327
16:57
4628 psi,Free spin dif 1312 psi, WH
636 psi
BOBD, CT Wt 5.4 k lbs, WOB 1.36 k
lbs. ROP 212 ft/hr
10,632' PU Wt 41 k Ibis -free spin
1,373 psi
10,652' PU Wt 39 k lbs, - free spin -
Starting to run out of push- pull 100'
BHAwiper.
10,785' PU W142 k lbs
10881' pu 54 and 42 k lbs, found
something hard.
tried to tiime out 5x5 sweep for wiper,
pick up slow till sweep out
Average ROP over interval 95 ft/hr
1015/2018
10/52018
0.40
PROD3
DRILL
WPRT
P
PU Wt 40 lbs - Wiper #1 - 1000'
10,882.0
9,882.0
16:57
17:21
1015/2018
10/5/2018
0.40
PROD3
DRILL
WPRT
P
RBIH
9,882.0
10,882.0
17:21
17:45
1015/2018
10/5/2018
1.25
PROD3
DRILL
DRLG
P
BOBD, 1.78 bpm at 5,470 psi, Diff-
10,882.0
11,023.0
17:45
19:00
1,230 psi, WHP=722, BHP= -4,639,
IA=654, OA=206
*** Note: New Mud at the bit @
10,927'
1015/2018
1015/2018
1.60
PROD3
DRILL
DRLG
P
PUH, obtain new drilling parameters
11,023.0
11,287.0
19:00
20:36
with new mud, OBD, 1.81 bpm at
5,062 psi, Diff=1,286 psi, WHP=914,
BHP=4,642, IA=651, OA=203,
10/5/2018
10152018
0.30
PROD3
DRILL
WPRT
P
Wiper up hole (1,000'), PUW 43 k
11,287.0
10,287.0
20:36
20:54
10/5/2018
10/512018
0.30
PROD3
DRILL
WPRT
P
Wiper back in hole, RIW 11 k
10,287.0
11,287.0
20:54
21:12
1015/2018
10/5/2018
1.40
PROD3
DRILL
DRLG
P
BOBD, 1.80 bpm at 5,053 psi,
11,287.0
11,437.0
21:12
22:36
Diff -1,290 psi, WHP=927,
BHP=4,665, IA=651, OA=208
1015/2018
1015/2018
0.15
PROD3
DRILL
WPRT
P
PUH, PUW 41 k, short wiper up hole,
11,437.0
1,193.0
22:36
22:45
1015/2018
1015/2018
0.15
PROD3
DRILL
WPRT
P
Wiper back in hole RIW 11 k
1,193.0
11,437.0
22:45
22:54
10/5/2018
1015/2018
0.60
PROD3
DRILL
DRLG
P
BOBD, 1.80 bpm at 5,053 psi,
11,437.0
11,518.0
22:54
23:30
Diff --1,290 psi, WHP=927,
BHP=4,665, IA=651, OA=208
10/5/2018
10/52018
0.30
PROD3
DRILL
WPRT
P
Incounter hard spot, work to get driling
11,518.0
11,518.0
23:30
23:48
ahead, PUW 35 k
"` Note: Sample indicated Ankente
10/52018
1016/2018
0.21
PROD3
DRILL
DRLG
P
BOBD, 1.80 bpm at 5,053 psi,
11,516.0
11,522.0
23:48
00:00
Diff=1,290 psi, WHP=927,
BHP=4,665, IA=651, OA=208
10/6/2018
10/6/2018
1.00
PROD3
DRILL
DRLG
P
BOBD, 1.80 bpm at 5,153 psi,
11,522.0
11,563.6-
00:00
01:00
Diff --1,290 psi, WHP=927,
BHP=4,665, IA=656, OA=206
1016/2018
10/6/2018
1.25
PROD3
DRILL
DRLG
P
Incountered hard spot, PUW 33 k, drill
11,563.0
11,568.0
01:00
02:15
ahead slowly, BOBD, 1.80 bpm at
5,053 psi, Diff -1,290 psi, WHP=927,
BHP=4,665, IA=656, OA=206
101612018
10/62018
0.60
PROD3
DRILL
DRLG
P
Drill ahead, BOBD, 1.80 bpm at 5,335
11,568.0
11,619.0
02:15
02:51
1
1
I
I
psi, Diff -1,280 psi, WHP=927,
BHP=4,665, IA=656, OA=206
10/6/2018
10/6/2018
1.25
PROD3
DRILL
WPRT
P
Wiper up to the window, PUW 37 k
11,619.0
8,700.0
02:51
04:06
1
1
I
Page 28137 Report Printed: 10/1512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SM DePM
Start Time
End Time
Dur (W)
Phase
Op Code
ACMity Cade
Time P -T -X
Operation
(M)
End OePN(M(B)
10/6/2018
10/6/2018
0.20
FROM
DRILL
DLOG
P
Log the RA marker correction of plus
8,700.0
8,720.0
04:06
04:18
4.0'
10/6/2018
10/6/2018
0.70
PROD3
DRILL
WPRT
P
Continue wiper back in hole, RIW 11 k
8,720.0
11,619.0
04:18
05:00
10/6/2018
10/6/2018
1.60
FROM
DRILL
DRLG
P
BOBD, 1.80 bpm at 5,194 psi,
11'619.0
11,629.0
05:00
06:36
Diff -1,238 psi, WHP=794,
BHP=4,694, IA=655, OA=207
Drilling hard spot. Average ROP 6 fUhr
10/6/2018
10/6/2018
0.50
FROM
DRILL
DRLG
P
Drilling breakll,629' - ROP up to 200
11,629.0
11,685.0
06:36
07:06
ft/hr
IA659 psi, 0A,209 psi
OBD, CT 5487 psi, @ 1.80 bpm,
annular 4728 psi, WH 850 psi
CT WT 0 k lbs, WOB 2.1 k lbs,
Average ROP 112 ft/hr
10/6/2018
10/6/2018
0.20
FROM
DRILL
WPRT
P
PU Wt 38 k, PUH past hard spot, neg
11,685.0
11,685.6-
07:06
07:18
WO spikes @ 11627', Saw positive
WOB spikes when trying to RBIH @
same depth.
Trouble RIH, reduce rale, etc. Pump
5x5 w 1% each 776/lowtorque
Trouble area - 11,627
10/6/2018
10/6/2018
2.30
FROM
DRILL
DRLG
P
CT 5273 psi @ 1.75 bpm, Free spin
11,685.0
11,852.0
07:18
09:36
diff 1195 psi, annular 4749 psi, WH
847 psi
OBD, CT WT -1 k lbs, WOB 1.8 k lbs,
ROP 90 Po hr
Average ROP 72 ff/hr
10/6/2018
10/6/2018
0.20
FROM
DRILL
WPRT
P
PU Wt 42 k, 200' wiper
11,852.0
11,852.0
09:36
09:48
10/6/2018
10/6/2018
5.50
FROM
DRILL
DRLG
P
CT 5332 psi @ 1.79 bpm, Free spin
11,852.0
12,065.0
09:48
15:18
diff 1262 psi, annular 4768 psi, WH
767 psi
OBD, CT WT -4 k lbs, WOB 1.6 k lbs,
ROP 90-20 fU hr
many pick ups, 44 -48 k lbs, pumpng
5x5 lube sweeps as needed
TD, let mill off from -4 k CT Wt to
neutral.
Average ROP 38 ft/hr
TD @ 12,065
10/6/2018
10/6/2018
0.80
FROM
DRILL
WPRT
P
PU Wt 48 k, Pull up hole to 11,627' to
12,065.0
12,034.0
15:18
16:06
clean up trouble area.
Sligt neg WOB then ran back through
it at full rate and 57min.
Pump 10 x 10 TD sweeps
RBIH
10/6/2018
10/6/2018
1.20
PRODS
DRILL
WPRT
P
PU WT 38 k lbs wiper to window.
12,034.0
8,701.0
16:06
17:18
10/6/2018
10/6/2018
0.20
FROM
DRILL
WPRT
P
Tie into the RA tag for a+3.5
8,701.0
8,721.0
17:18
17:30
1
1 correction
10/6/2018
10/6/2018
1.20
PROD3
DRILL
WPRT
P
RBIH to confirm depth
8,721.0
12,066.0
17:30
18:42
10/62018
10/6/2018
1.30
PRODS
DRILL
WPRT
P
POOH, laying in beaded drilling fluid
12,066.0
8,700.0
18:42
20:00
10/62018
10/62018
1.00
PRODS
DRILL
TRIP
P
Continue POOH, increase pump rate
8,700.0
3,000.0
20:00
21:00
1.8 bpm at 5,370 psi, IA=642, OA=207
10/6/2018
10/6/2018
0.75
FROM
DRILL
TRIP
P
Perform jog IH, jet across orbit valve,
3,000.0
3,600.0
21:00
21:45
continue POOH
10/6/2018
10/6/2018
0.75
FROM
DRILL
TRIP
P
Check well for flow, PJSM, LD drilling
78.2
0.0
21:45
22:30
assembly over a dead well.
Page 29137 ReportPrinted: 10/15/2018
Operations Summary (with Timelog Depths)
31-01
. e e
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
StartTime
End Tine
Dur(hr)
Phase
Op Code
Activity Code
The P-T-x
Operation
(IIKB)
End Depth(1tKB)
1016/2018
10/6/2018
0.80
COMPZ3
CASING
PUTB
P
Prep RF for liner OPS.
0.0
0.0
22:30
23:18
1016/2018
10/7/2018
0.70
COMPZ3
CASING
PUTB
P
PJSM, pick up liner segment #1 w/ 66
0.0
407.9
23:18
00:00
jts of slotted liner
10/712018
10/7/2018
2.00
COMM
CASING
PUTB
P
Continue picking up Lt-05 completion
407.9
2,036.3
00:00
02:00
liner segement #1, Jt #13
10/7/2018
10/7/2018
0.50
COMPZ3
CASING
PUTB
P
Clear RF of liner running equipment,
2,036.3
2,036.3
02:00
02:30
PJSM
10/7/2018
10/7/2018
1.20
COMM
CASING
PULD
P
PU/MU Coiltak tools, surface test
2,036.3
2,081.8
02:30
03:42
(good-test), check pac-offs (good),
switched out BHI check UCG
10/7/2018
10!7/2018
2.10
COMPZ3
CASING
RUNL
P
Tag up reset counters, RIH, pumping
2,081.8
10,412.0
03:42
05:48
min rate, PU Wt 41 k @ 8581'
10/7/2018
10!7/2018
0.20
COMPZ3
CASING
DLOG
P
Tie into the K1 for a +2' correction.
10,412.0
10,441.0
05:48
06:00
1017/2018
10/7/2018
0.60
COMPZ3
CASING
RUNL
P
Coninue to RIH, SID @ 12,066'. PU
10,412.0
12,066.0
06:00
06:36
WT 50 k -5.4 k WOB. RBIH, SID 3.4 k
WOB, Bring rate to 1.64 bpm, diff 981
psi, PU Wt 37k WOB -1.40 k lbs, liner
released, down on the pump.
10/7/2018
10/7/2018
0.10
COMPZ3
CASING
TRIP
P
PUH, park, reset counters to acount
12,066.0
10,016.3
06:36
06:42
for dropped off liner
10/7/2018
10/7/2018
2.40
COMPZ3
CASING
TRIP
P
POOH, park near surface, open EDC,
10,016.3
50.0
06:42
09:06
continue out of hole.
10/7/2018
10P/2018
1.00
COMPZ3
CASING
PULD
P
Close Orbit valve, trap 1733 psi WH
50.0
0.0
09:06
10:06
that bled to 1526 psi in 20 min. LD
BHA # 26.
101712018
1017/2018
0.40
COMPZ3
CASING
PUTS
P
Clear and prep floor to run liner.
0.0
0.0
10:06
10:30
10/7/2018
1017/2018
1.30
COMPZ3
CASING
PUTS
P
PU L1-05 upper completion ( run #2 ).
0.0
854.0
10:30
11:48
27 joints 2-3/8" 4.6 Ib/fl ST-L slotted
liner under an anchored liner top billet
with a ported bull nose. (LOA 854.76')
10/712018
10/7/2018
1.70
COMPZ3
CASING
PUTB
P
PJSM, PU BHA, check pack off, good,
854.0
916.0
11:48
13:30
stab injector, tool test good, bump up,
set counters.
10/7/2018
1017/2018
3.20
COMPZ3
CASING
RUNL
P
RIH, tie into whie window flag for-
916.0
10,024A
13:30
16:42
19.5' correction. Pumps off, dose
EDC, PU WT 40k lbs. continue to
RIH. Tag up 10,024', SID 2.9 k IDS.
PU, 39k lbs. RBIH, Oriented 180 °
ROHS, SID 2.48k lbs, TOB @ 9,170'.
Pickup to neutral weight. WH 1135
pi. Line up pump to coil. Weak point
sheared @ 6200 psi.
1017/2018
10772018
1.40
COMM
CASING
TRIP
P
PU 33 k Itis, park, reset counters,
10,024.0
50.0
16:42
18:06
POOH
10/7/2018
10/712018
1.50
COMPZ3
CASING
PULD
P
PUD BHA
10,024.0
50.0
18:06
19:36
1017/2018
10/7/2018
0.50
COMPZ3
CASING
PULD
P
LD settling tools
50.0
0.0
19:36
20:06
10/7/2018
10/72018
0.50
PROD4
DRILL
CTOP
P
PJSM, jet BOP Stack
0.0
0.0
20:06
20:36
10/7/2018
1017/2018
0.60
PROD4
DRILL
CTOP
P
Grease crew on location, grease well
0.0
0.0
20:36
21:12
head and swab valves, prep test joint
10/7/2018
1017/2018
0.80
PROD4
DRILL
CTOP
P
Test and chart inner reel valve and
0.0
0.0
21:12
22:00
pac-off.
10/7/2018
10/8/2018
2.00
PROD4
WHDBOP
BOPE
P
Perform Bi-weekly BOP test 250
0.0
0.0
22:00
00:00
low/2,500 annular/4,900 psi high, state
wiliness waived (Brian Bixby)
Page 30137 ReportPrinted: 10/15/2018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
De
Start Depth
Shut
start Tme
End Tmre
Dur(hr)
(
Phase
O code
p
Activity Cade
My
Time P -T -X
Operetlon
End Depth (MB)
10/8/2018
10/8/2018
3.00
PROD4
WHDBOP
BOPE
P
Continue Bi -weekly BOP test 250
0.0
0.0
00:00
03:00
low/2,500 annular/4,900 psi high, state
Witness waived (Brian Bixby)
10/8/2018
1018/2018
1.50
PROD4
WHDBOP
BOPE
P
Mechanic on location, PJSM, locklout
0.0
0.0
03:00
04:30
equipment, suck down stack, replace
B7, manual
10/8/2018
10/8/2018
1.80
PROD4
WHDBOP
BOPE
P
Fill stack, install test joint, continue
0.0
0.0
04:30
06:18
with BOP lest (12-15)
"•8:00 hr test
10/8/2018
10/8/2018
1.00
PROD4
STK
CTOP
P
Blow down, install checks, valve
0.0
0.0
06:18
07:18
checklist post BOP test, PJSM
10/8/2018
10/8/2018
2.40
PROD4
STK
PULD
P
PU & PD BHA#26, 1.2° AKO baker
0.0
72.0
07:18
09:42
omotor over a BH P104 cutter bit.
Hung up in stack with high bend
motor, worked it free, crowned tool out
in PDL, ran BHA in to no go, had to
work wire to space out. Popped off
PDL, spaced out -4.5'to high. Stab
back on, RBIH, continue PD, spaced
out corectly. continue on, inspect
pack offs, good. Stab injetor, bump
up, set counters.
10/8/2018
10/8/2018
1.60
PROD4
STK
TRIP
P
RIH
72.0
8,400.0
09:42
11:18
10/8/2018
10/812018
0.20
PROD4
STK
DLOG
P
Tie into the K1 for -11 ' correction.
8,400.0
8,424.3
11:18
11:30
10/8/2018
10/812018
0.20
PROD4
STK
TRIP
P
Continue to RIH
8,424.3
9,170.0
11:30
11:42
PU Wt 38 k @ 8160'
Close EDC, continue to RIH, tag TOB
9170'
PU Wt 40 k lbs
10/8/2018
10/812018
1.40
PROD4
STK
KOST
P
Start time milling, tff/hr @ 9170.
9,170.0
9,170.6
11:42
13:06
Stall X3 @ 9170.6', 9170.3, & 9170.2',
PU WPs 37 - 33 k lbs
10/8/2018
10/8/2018
0.60
PROD4
STK
KOST
P
RBIH after last PU. CT Wt falling off,
9,170.6
9,170.6
13:06
13:42
WOB falling off, should have picked
up an agitator w this high bend motor.
Fighting a little slip stick.
Activated low frequency, surface
controlled, agitator. Regained WOB
and vibrations.
Mill ahead, aluminum at the shaker.
10/8/2018
10/8/2018
0.20
PROD4
STK
KOST
P
WOB falling off at curent ROP,
9,170.6
9,171.1
13:42
13:54
increase to 2 ft/min ahead of
schedule.
targeting 100-150 lbs WOB
10/8/2018
10/6/2018
0.70
PROD4
STK
KOST
P
Increase to 3 ft/min
9,171.7
9,173.2
13:54
14:36
targeting 100-150 Ibs WOB
10/8/2018
10/8/2018
0.60
PROD4
STK
KOST
P
Increase to 5 ft/min, WOB stedily
9,173.2
9,175.7
14:36
15:12
came up, targeting WOB - 1-1.8 k lbs
by regulating ROP.
1018/2018
10/8/2018
1.40
PROD4
DRILL
DRLG
P
WOB fell from 1.78 - 360 Ibs from
9,175.7
9,277.0
15:12
16:36
9174.9 to 9175.0'
Drilling ahead slowly targeting greater
than 1 k less than 2 k Ibs WOB,
Drill ahead after 9184'
10/8/2018
10/8/2018
0.20
PROD4
DRILL
WPRT
P
PU Wt 40 k Ibs, PUH
9,277.0
9,277.0
16:36
16:48
Dry drift the billet - clean
RBIH
10/812018
10/8/2018
0.90
PROD4
DRILL
DRLG
P
CT 4484 psi @ 1.78 bpm, free spin diff
9,277.0
9,385.0
16:48
17:42
490 psi, annular 4560 psi, WH 823
psi, IA 640 psi, OA 194 psi. BOBD, CT
11 k lbs, WOB 2.3 klbs, ROP 115 it/hr
Page 31137 ReportPrinted: 1 0/1 512 01 8
Operations Summary (with Timelog Depths)
31-01
%Og:
NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
wart Depth
Stmt Time
End Time
Dur PM
Phase
Op code
Activity Code
Time P -T -x
Operation
(ftKB)
End Depth (M(B)
10/8/2018
1018/2018
2.40
PROD4
DRILL
TRIP
P
TO turn early @ 9385', PU wt 39 k lbs
9,385.0
45.0
17:42
20:06
Jog to time out 5x5 sweep
PUH past billet, clean, and window, -
1.7 k lbs, WOB tug
Open EDC, continue out of hole.
•" Saw 10k lbs string weight over
pull and -4k WOB @ 8517' locator
assembly.
10/8/2018
10/8/2018
1.30
PROD4
DRILL
PULD
P
Bump up, space out, PUD BHA #26,
45.0
0.0
20:06
21:24
10/8/2018
10/8/2018
1.30
PROD4
DRILL
PULD
P
PD BHA#27, skid cart, check pack
0.0
78.0
21:24
22:42
offs, replae with new, stab injector,
bump up, set counters.
10/812018
10/8/2018
1.20
PROD4
DRILL
TRIP
P
RIH, Shallow test the agitator. looks
78.0
8,400.0
22:42
23:54
like the agitator is showing up at - 16
Hz
Rale Ann Bore Circ Diff (psi)
1.10 1832 2391 3797 544
1.52 1740 2653 4640 912
1.80 1716 2975 5401 1241
10/8/2018
10/9/2018
0.10
PROD4
DRILL
TRIP
P
Tie into the K1 marker for a minus
8,400.0
6,050.0
23:54
00:00
20.5 correction.
1019/2018
10/9/2018
0.45
PROD4
DRILL
TRIP
P
Continue RIH w/ lateral drilling BHA
6,050.0
8,400.0
00:00
00:27
1019/2018
10/9/2018
0.20
PROD4
DRILL
DLOG
P
Log the formation, (K1 marker)
8,400.0
8,445.0
00:27
00:39
correction minus 20'
1019/2018
1019/2018
0.20
PROD4
DRILL
TRIP
P
Continue IH
8,445.0
9,385.0
00:39
00:51
1019/2018
10/9/2018
3.90
PROD4
DRILL
DRLG
P
OBD, 1.77 bpm at 5,409 psi FS,
9,385.0
9,785.0
00:51
04:45
Diff --1,450 psi, WHP=668,
BHP=4,567, IA=629, OA=187
10/9/2018
10/9/2018
0.30
PROD4
DRILL
WPRT
P
Wiper up hole, PUW 41 k
9,785.0
9,200.0
04:45
05:03
10/9/2018
10/9/2018
0.30
PROD4
DRILL
WPRT
P
Wiper back in hole
9,200.0
9,785.0
05:03
0521
10/9/2018
10/9/2018
2.70
PROD4
DRILL
DRLG
P
BOBD, 1.78 bpm at 5,301 psi FS,
9,785.0
10,175.0
05:21
08:03
Diff --1,250 psi, WHP=765,
BHP=4,618, IA=644, OA=197
10/9/2018
10/9/2018
0.45
PROD4
DRILL
WPRT
P
Wiper up hole, PUW 41 k
10,175.0
9,200.0
08:03
08:30
10/9/2018
10/9/2018
0.45
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW
9,200.0
10,175.0
08:30
08:57
10/9/2018
10/9/2018
1.00
PROD4
DRILL
DRLG
P
BOBO, 1.80 bpm at 5,300 psi FS,
10,175.0
10,320.0
08:57
09:57
Diff=1,190 psi, WHP=752,
BHP=4,645, IA=646, OA=200
10/9/2018
10/9/2018
0.20
PROD4
DRILL
WPRT
P
PUH for a BHA wiper (100')
10,320.0
10,320.0
09:57
10:09
10/9/2018
10/9/2018
1.35
PROD4
DRILL
DRLG
P
BOBD, 1.80 bpm at 5,350 psi FS,
10,320.0
10,450.0
10:09
11:30
Diff --1,253 psi, WHP=718,
BHP=4,625, IA=648, OA=202
10/9/2018
10/9/2018
0.65
PROD4
DRILL
WPRT
P
Wiper up to the window for a tie in.
10,450.0
8,700.0
11:30
12:09
PUW 37 k, performing jog back in hole
from 9,200'-9,380'
10/9/2018
10/9/2018
0.20
PROEM
DRILL
DLOG
P
Log the RA marker for depth control
8,700.0
8,718.0
12:09
12:21
(plus 75)
10/9/2018
10/912018
0.65
PROD4
DRILL
WPRT
P
Continue wiper back in hole, RIW 11 k
8,718.0
10,450.0
12:21
13:00
10/9/2018
10/9/2018
4.70
PROD4
DRILL
DRLG
P
BOBD, 1.78 bpm at 5,257 psi FS,
10,450.0
10,919.0
13:00
17:42
Diff=1,187 psi, WHP=769,
BHP=4,657, IA=648, OA=202
"" Note: New Mud at the bit 10,509',
old mud stats: 2,478' DF / 0.96% DS
Page 32137 ReportPrinted:1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
alert Depth
I
Siert Tme
End Time
Dur(hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(flk8)
End Depth(Wlt)
10/9/2018
1101912018
0.80
PROD4
DRILL
WPRT
P
10,919 pull 1 000'wiper trip,
10,919.0
10,919.0
17:42
18:30
PUW=45K
10/9/2018
10/9/2018
1.30
PROD4
DRILL
DRLG
P
10,919', Drill, 1.82 BPM @ 5140 PSI
10,919.0
11,125.0
18:30
19:48
FS, BHP=4711
10/9/2018
1019/2018
0.30
PROD4
DRILL
WPRT
P
11,125'. BHA+wiper trip. PUW=45K
11,125.0
11,125.0
19:48
20:06
10/9/2018
10/9/2018
1.90
PROD4
DRILL
DRLG
P
11126, Drill, 1.82 BPM @ 5285 PSI
11,125.0
11,270.0
20:06
22:00
FS, BHP=4705, ROP=140 FPM,
Drilling break @ 11223', ROP down to
10 FPH. Hard to maintain steady state
drilling. Pump sweeps. Several pick
ups. Drill improves -11,240
1019/2018
10/9/2018
0.70
PROD4
DRILL
WPRT
P
11,270', 1000'wiper trip, PUW=41K
11,270.0
11,270.0
22:00
22:42
10/9/2018
10/10/2018
1.30
PROD4
DRILL
DRLG
P
11,270', Drill, 1.8 BPM @ 5325PSI FS,
11,270.0
11,377.0
22:42
00:00
BHP=4785
10/10/2018
10/10/2018
0.10
PROD4
DRILL
WPRT
P
BHA wiper, stacking
11,377.0
11,377.0
00:00
00:06
10/10/2018
10/10/2018
1.10
PROD4
DRILL
DRLG
P
22,377', Drill 1.81 BPM @ 5324 PSI
11,377.0
11,442.0
00:06
01:12
FS, BHP=4785
10/10/2018
10/10/2018
0.20
PROD4
DRILL
WPRT
P
200'wiper trip, PUW=47K
11,442.0
11,442.0
01:12
01:24
10/10/2018
10/10/2018
2.30
PROD4
DRILL
DRLG
P
11442', Drill, 1.81 BPM @ 5292 PSI
11,442.0
11,491.0
01:24
03:42
FS, BHP=4706, RIW=-4K,
DHWOB=I.1 K, Drilling break @
11461, ROP -20 FPHTrying to build,
Multiple pick ups
10/10/2018
10110/2018
0.30
PROD4
DRILL
WPRT
P
Pull 400'wiper, PUW=51 K, Clean
11,491.0
11,491.0
03:42
04:00
wiper with sweeps
10/10/2018
10110/2018
1.25
PROD4
DRILL
DRLG
P
11491', Drill, 1.8 BPM @ 5282 PSI FS,
11,491.0
11,542.0
04:00
05:15
BHP=4699, Wiper helped with ROP
20-40 FPH, Drilling break @ 11,503'
ROP to 70-100 FPH RIW @ 0 with
1.6K DHWOB
10/10/2018
10/10/2018
1.40
PROIX
DRILL
WPRT
P
wiper up hole to the window for a tie
11,542.0
8,700.0
05:15
06:39
in, PUW 47 k, performing jog from
19,200'-9,350-
10/10/2018
10/10/2018
0.15
PROD4
DRILL
DLOG
P
Log the RA marker correction of plus
8,700.0
8,718.6
06:39
06:48
8.5'
10110/2018
10/10/2018
1.30
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW 6 k
8,718.6
11,542.0
06:48
08:06
10/10/2018
10/10/2018
0.40
PROD4
DRILL
DRLG
P
BOBO, 1.77 bpm at 5,278 psi FS,
11,542.0
11,576.0
08:06
08:30
Diff --1,123 psi, WHP=855,
BHP=4,748. IA=656, OA=210
10/10/2018
10/10/2018
0.50
PROD4
DRILL
WPRT
P
Wiper up hole 100'
11,576.0
11,576.0
08:30
09:00
10/10/2018
10/10/2018
2.00
PROD4
DRILL
DRLG
P
Fighting hard spot with some weight
11,576.0
11,610.0
09:00
11:00
transfer issues, multiple pickups and
manipulating pump rates, continue
drilling ahead. OBD, 1.77 bpm at
5,278 psi FS, Diff -1,123 psi,
WHP=855, BHP=4,748. IA=656,
OA=210
10/10/2018
10/10/2016
0.25
PROD4
DRILL
WPRT
P
Encounter 100% losses, slowly
11,610.0
11,100.0
11:00
11:15
1
1
healing up, Wiper up hole 500'
10/10/2018
10/10/2018
0.30
PRO
DRILL
WPRT
P
Wiper back in hole, RIW 9 k
11,100.0
11,610.0
11:15
11:33
10/1012018
10110/2018
0.30
PROD4
DRILL
DRLG
P
BOSO, 1.77 bpm at 5,278 psi FS,
11,610.0
11,642.0
11:33
11:51
Diff -1,123 psi, WHP=855,
BHP=4,748. IA=656, OA=210
10/10/2018
10/10/2018
0.50
PROD4
DRILL
WPRT
PCall
TO Lt lateral, PUH send 10x10
11,642.0
11,642.0
11:51
12:21
sweep
Page 33137 ReportPrinted: 1011512018
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
seat Depth
Start Time
End Tme
dv (hr)
Phase
Op Code
Aodvity Code
Time P-T-X
Operation
(MB)
End Depth (M(B)
10/10/2018
10/10/2018
1.25
PROD4
DRILL
WPRT
P
Wiper up hole chasing sweeps to the
11,642.0
8,700.0
1221
13:36
window
10/10/2018
10/10/2018
0.20
PROD4
DRILL
DLOG
P
Log the RA marker for depth control,
8,700.0
8,744.0
13:36
13:48
correction of plus 3.0'
10110/2018
10/10/2018
0.75
PROD4
DRILL
WPRT
P
Contiue wiper back in hole, RIW 14 k
8,744.0
10,884.0
13:48
14:33
10/10/2018
10/10/2018
0.75
PROD4
DRILL
WPRT
P
Bobble @ 10,884'-10,895', PUH
10,884.0
10,895.0
14:33
15:18
attempt to dean area w/DTF, no
change,
10110/2018
10/1012018
0.30
PROD4
DRILL
WPRT
P
Continue IH
10,895.0
11,400.0
15:18
15:36
10/10/2018
10/10/2018
3.00
PROD4
DRILL
TRIP
P
POOH, laying in beaded liner running
11,400.0
58.0
15:36
18:36
pill up to the window. Close Orbit vale
@ 200', Tag up and space out
10/10/2018
10/10/2018
1.00
PROD4
DRILL
PULD
P
PJSM, Flow chec well, Lay down BHA
58.0
0.0
18:36
19:36
#27 L1 lateral drilling BHA. Observed
flat area in CT. UT test @ .178
thinnest area we could find
10/10/2018
10/11/2018
4.40
COMPZ4
CASING
PUTB
P
PJSM, Prep floor and M/U BHA #28
0.0
2,323.7
1936
00:00
with non ported bullnose, 57 Jts
slotted 2 3/8" liner, and liner top billet.
M/U to coil trek and surface test. Tag
up and set depth
10/1112018
10/11/2018
1.10
COMPZ4
CASING
TRIP
P
Trip in hole, BHA #28
2,323.7
8,646.0
0000
01:06
10/11/2018
10/11/2018
0.10
COMPZ4
CASING
DLOG
P
Tie into white EDP flag for -22.7
8,646.0
8,624.0
01:06
01:12
10/11/2018
10/11/2018
2.30
COMPZ4
CASING
TRIP
P
Continue trip in hole, Clean pass
8,624.0
11,404.0
01:12
03:30
hrough window, Initial set down @
10025, Start working pipe with
continued movement down. Unable to
tie in due to hole conditions. get to set
depth @ 11404.5'. Pull out slack an
pump off. Did not releaase on frtst
atempt. PUW=51 K, DHWOB=-10k.
Work back down to set depth. Pull
slack RIH to -2K DHWOB. Pump off.
PUW=38 K DHWOB=-3K.
10/11/2018
10/11/2018
2.00
COMPZ4
CASING
TRIP
P
PUH to 11387. Remove liner length
9,107.0
200.0
03:30
05:30
left in hole from counters. Trip out
filling across top
10/11/2018
10/11/2018
1.20
COMPZ4
CASING
PULD
P
At surface spaceout, PUD & LD
200.0
O.0
05:30
06:42
setting tools
10/11/2018
10/11/2018
1.20
PRODS
STK
PULD
P
PJSM, PD build section BHA#29, stab
0.0
72.2
06:42
07:54
UOC, surface test tools (good-test),
stab/MU INJH
10/11/2018
10/11/2018
1.50
PROD5
STK
TRIP
P
Tag up, re-set counters, RIH
72.2
8,400.0
07:54
09:24
10/11/2018
10/11/2018
0.15
PRODS
STK
DLOG
P
Log the Kl marker correction of minus
8,400.0
8,444.0
09:24
09:33
19'
10/11/2018
10/11/2018
0.45
PRODS
STK
TRIP
P
Continue to RIH, PU Wt 38 k @
8,444.0
9,126.0
09:33
1000
8,160', Close EDC, continue to RIH,
tag TOB @ 9,126.3'
PU Wt 38 k lbs
10/1112018
10/11/2018
2.00
PRODS
STK
KOST
P
Start time milling,
9,126.0
9,128.4
10:00
12:00
lftlhr @ 9,126.25'
2ft/hr @ 9127.25'
3 ft/hr @ 9128.25'
10/11/2018
10/11/2018
0.20
PROD5
STK
KOST
P
Increase WOB to 1k
9,128.4
9,132.0
12:00
12:12
I
I
I
I
Page 34/37 ReportPrinted: 10/1512018
Operations Summary (with Timelog Depths)
31-01
li p
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
rt
Stat Tine
End Time
our (hr)
Phase
Op COW
Activity Code
Time P -T -X
Operation
Ke)
End Depth (flKe)
10/11/2018
10/11/2018
0.20
PRODS
DRILL
DRLG
P
Drill Ahead, 1.78 bpm at 4,521 psi,
9,132.0
9,137.0
12:12
12:24
Diff -491 psi, WHP=929, BHP=4,538,
IA=652, OA=208
10/11/2018
10/11/2018
0.15
PRODS
DRILL
DRLG
P
Stacking weight @ 9,132', PUH and re
9,137.0
9,137.0
12:24
12:33
-start
10/11/2018
10/11/2018
0.75
PRODS
DRILL
DRLG
P
OBD, 1.78 bpm at 4,569 psi, Diff=521
9,137.0
9,215.0
12:33
13:18
psi, WHP=925, BHP=4,543, IA=658,
OA=208
10/11/2018
10111/2018
0.15
PRODS
DRILL
WPRT
P
PU Wt 38 k lbs, PUH
9,215.0
9,102.0
13:18
13:27
Dry drift the billet - clean
RBIH
10111/2018
10111/2018
0.15
PRODS
DRILL
WPRT
P
RBIH to bottom, send 5x5 sweep
9,102.0
9,215.0
13:27
13:36
10/11/2018
10/11/2018
0.65
PRODS
DRILL
DRLG
P
OBD, 1.78 bpm at 4,569 psi, Diff -521
9,215.0
9,325.0
13:36
14:15
psi, WHP=925, BHP=4,543, IA=658,
OA=208
10/11/2018
10/11/2018
1.00
PRODS
DRILL
DRLG
P
9,325', TO build section,POOH, PUW
9,325.0
5,780.0
14:15
15:15
38k. open EDC above window,
continue POOH, Function closed
EDC, obtain screen shots w/no
agitator, 1.0 bpm, 1.5 bpm, and 1.8
bpm. continue POOH, Avg DLS=38°
10/11/2018
10/11/2018
1.50
PRODS
DRILL
TRIP
P
Continue POOH, Stop at 500'. Obtain
5,780.0
51.0
15:15
16:45
screen shots @ 1, 1.5, and 1.8 BPM.
Continue to surface
10/11/2018
10/11/2018
1.30
PRODS
DRILL
PULD
P
At surface, Tag up and space out,
51.0
0.0
16:45
18:03
PJSM PUD BHA#29
10/11/2018
10/11/2018
1.00
PRODS
DRILL
SVRG
P
MN Nozzle, stab on and jet stack.
0.0
0.0
18:03
19:03
Flush stack and micro motion
10111/2018
10/11/2018
1.15
PRODS
DRILL
PULD
P
PJSM, PD BHA# 30 L1-02 lateral
0.0
78.2
19:03
20:12
drilling BHA with .5° AKO motor, Make
up to coil, Strip on and surface test.
10/11/2018
1011112018
1.60
PRODS
DRILL
TRIP
P
RIH BHA#30, test agitator @ 500'
78.2
8,400.0
20:12
21:46
with screenshots, continue in hole
10111/2018
10/11/2018
0.20
PRODS
DRILL
DLOG
P
Log K1 for -21' correction
8,400.0
8,424.0
21:48
22:00
10/11/2018
10/11/2018
0.40
PRODS
DRILL
TRIP
P
Continue in well, set down @ 8693,
8,424.0
9,325.0
22:00
22:24
PUH roll pump, S/D and pass through
10/11/2018
10/12/2018
1.60
PRODS
DRILL
DRLG
P
Tag up and drill from 9325', 1.78 BPM
9,325.0
9,577.0
22:24
00:00
@ 5220 PSI FS, BHP=4672,
RIW=10.9K, DHWOB=I.8K
10/12/2018
10/12/2018
1.40
PRODS
DRILL
DRLG
P
9577', Drill, 1.78 BPM @ 5220 PSI
9,577.0
9,750.0
00:00
01:24
FS, BHP=4611
10/12/2018
10/1212018
0.50
PRODS
DRILL
WPRT
P
9750', Wiper to billet -9130,
9,750.0
9,750.0
01:24
01:54
PUW=381<
10112/2018
10/12/2018
1.00
PRODS
DRILL
DRLG
P
9750', Drill, 1.78 BPM @ 5335 PSI
9,750.0
9,875.0
01:54
02:54
FS, BHP=4610, RIW=10.2K,
DHWOB=I.1K
10/12/2018
10/12/2018
0.10
PRODS
DRILL
WPRT
P
9875, BHA Wiper, PUW=38K
9,875.0
9,875.0
02:64
03:00
10/12/2018
10112/2018
2.00
PRODS
DRILL
DRLG
P
9875', Drill, 1.78 BPM @ 5335 PSI
9,875.0
10,152.0
03:00
05:00
FS, BHP=4610, RIW=9.8K
DHWOB=1.2K
10/12/2018
10/12/2018
0.25
PRODS
DRILL
WPRT
P
10152', Wiper to 9350, PUW=36K
10,152.0
9,350.0
05:00
0515
10/12/2018
10/12/2018
0.25
PRODS
DRILL
WPRT
P
Wiper back in hole, RIW 7.5 k
9,350.0
10,152.0
05:15
05:30
10112/2018
10/12/2018
1.00
PRODS
DRILL
DRLG
P
BOBD,1.78 bpm at 5,347 psi FS,
10,152.0
10,334.0
05:30
06:30
Diff -941, BHP=4,692, IA=643,
OA=208
Page 36137 Report Printed: 1 011 5/2 01 8
Operations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Srad Mme
End Time
Dur(hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Deplh M)
10/12/2018
10/12/2018
0.75
PRODS
DRILL
WPRT
T
DO wiper up hole, PUW=42 k
10,334.0
10,334.0
06:30
07:15
10/1212018
10/12/2018
1.65
PRODS
DRILL
TRIP
T
Continue POOH, after discussing plan
10,334.0
72.2
07:15
08:54
forward decision was made to POOH
for ako change. PJSM for UD
10/12/2018
10/12/2018
1.20
PRODS
DRILL
PULD
T
At surface, spaceout, PUD Lateral
72.2
0.0
08:54
10:06
Drilling BHA#30
10112/2018
10/12/2018
0.20
PRODS
DRILL
PULD
T
Change out drilling motor and agitator,
0.0
0.0
10:06
10:18
1
inspect bit
1011212018
10/12/2018
0.65
PRODS
DRILL
PULD
T
PD, L1-02 lateral drilling BHA #31
0.0
78.3
10:18
10:57
10/12/2018
10/12/2018
1.50
PRODS
DRILL
TRIP
T
RIH, pumping min rate @ 2,600 psi
78.3
8,400.0
10:57
12:27
10/12/2018
10/12/2018
0.20
PRODS
DRILL
DLOG
T
Log the K1 marker correction of minus
8,400.0
8,428.0
1227
1239
201, PUW 36 k
10/12/2018
10/12/2018
0.90
PRODS
DRILL
TRIP
T
Continue IH
8,428.0
10,334.0
12:39
13:33
10/12/2018
10/12/2018
1.95
PRODS
DRILL
DRLG
P
OBD, 1.80 bpm at 5,190 psi FS,
10,334.0
10,537.0
13:33
15:30
Diff-992, BHP=4,658, WHP=758,
IA=648, OA=204, swap mud with new
mud at bit 10490
10/12/2018
10/12/2018
0.20
PRODS
DRILL
WPRT
P
New mud all around, pull short wiper
10,537.0
10,537.0
15:30
15:42
to update pressure parameters,
PUW=38K
10/12/2018
10/12/2018
1.50
PRODS
DRILL
DRLG
P
10537', Drill 1.81 BPM @ 4995 PSI
10,537.0
10,733.0
15:42
17:12
FS, BHP=4657
10/12/2018
10/12/2018
0.70
PRODS
DRILL
WPRT
P
10,733 pull 1000' wiper, PUW=45K
10,733.0
10,733.0
17:12
17:54
10/12/2018
10/12/2018
1.10
PRODS
DRILL
DRLG
P
10733', Drill, 1.8 BPM @ 4933 PSI
10,733.0
10,873.0
17:54
19:00
FS, BHP=4688
10/12/2018
10/12/2018
0.30
PRODS
DRILL
WPRT
P
Stacking with poor transfer, Pull 250'
10,873.0
10,873.0
19:00
19:18
wiper, PUW=45K
10/12/2018
10/12/2018
1.60
PRODS
DRILL
DRLG
P
10873', Drill 1.79 BPM @ 4915 PSI
10,873.0
11,098.0
19:18
20:54
FS, BHP=4667, RIW=-4K,
DHWOB=2K
10/1212018
10/1212018
0.80
PRODS
DRILL
WPRT
P
1000'wiper, PUW=40K
11,098.0
11,098.0
20:54
21:42
10/12/2018
10/12/2018
1.10
PRODS
DRILL
DRLG
P
11098', drill, 1.78 BPM @ 5030 PSI
11,098.0
11,270.0
21:42
22:48
FS, BHP=4710, RIW=5K,
DHWOB=1.9K
10/12/2018
10/12/2018
0.10
PRODS
DRILL
WPRT
P
11270'. BHA wiper, PUW=46K
11,270.0
11,270.0
22:48
22:54
10/12/2018
10/13/2018
1.10
PRODS
DRILL
DDRL
P
11270', Drill, 1.78 BPM @ 5080 PSI
11,270.0
11,378.0
22:54
00:00
FS, BHP=4715, RIW=-1K,
DHWOB=I.4K
10/13/2018
10/13/2018
0.30
PRODS
DRILL
DRLG
P
Drilling, 1.8 BPM @ 5080 PSI FS,
11,378.0
11,400.0
00:00
00:18
BHP=4750
10/13/2018
10/13/2018
1.60
PRODS
DRILL
WPRT
P
Call TD, 10 X 10 sweeps coming out,
11,400.0
8,400.0
00:18
01:54
Wiper to window. Pull into casing and
circ bottoms up
10/13/2018
10/13/2018
0.10
PRODS
DRILL
DLOG
P
Log K1 for +4'correction
8,400.0
8,422.0
01:54
02:00
10/13/2018
10/13/2018
1.20
PRODS
DRILL
WPRT
P
Wiper back to bottom to confirm TO.
8,422.0
11,400.0
02:00
03:12
Hole very clean, took 800 Lb DHWOB
@ 10,025.
10/13/2018
10/13/2018
0.30
PRODS
DRILL
WPRT
P
Tag TO @ 11400. PUH to get beaded
11,400.0
11,400.0
03:12
03:30
liner running pill to bit
10/13/2018
10113/2018
2.50
PRODS
DRILL
TRIP
P
Trip out of hole pumping 50 BBI
11,400.0
80.0
03:30
06:00
beaded liner running pill, PUW=39K
Page 36/37 ReportPrinted: 10/15/2018
. Gperations Summary (with Timelog Depths)
31-01
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Time
End 7me
Dur(hp
Phase
op Cafe
Activity Cone
Time P -T -X
Operation
start Depth
(hKa)
End Depth(%Ke)
10/13/2018
10/13/2018
1.50
PROD5
DRILL
PULD
P
At surface, function closed orbit valve
80.0
0.0
06:00
07:30
(1,700 psi), check well for flow, LD
drilling BHA on a dead well,
10/13/2018
10/13/2018
0.50
COMPZ5
CASING
PUTB
P
Prep RF for liner ops, PJSM
0.0
0.0
07:30
08:00
10/13/2018
10/13/2018
3.50
COMPZ5
CASING
PUTB
P
MU 69 jts of slotted liner
0.0
2,732.1
08:00
11:30
10/13/2018
10/13/2018
0.50
COMPZ5
CASING
PULD
P
PU/MU Coiltrak tools, surface test
2,732.1
2,776.3
11:30
12:00
(good -test), check pac-offs
10/13/2018
10/13/2018
1.50
COMPZ5
CASING
RUNL
P
RIH, with Lt -02 slotted liner
2,776.3
8,575.8
12:00
13:30
completion
10/13/2018
10/13/2018
0.10
COMPZ5
CASING
RUNL
P
Correct to the EDP flag minus 23.15'
8,575.8
8,578.8
13:30
13:36
10/13/2018
10/13/2018
0.50
COMPZ5
CASING
RUNL
P
Continue IH
8,578.8
9,743.0
13:36
14:06
10/13/2018
10/13/2018
2.50
COMPZ5
CASING
RUNL
T
Initial set down, work pipe towards
9,743.0
11,400.0
14:06
16:36
bottom, PUW 42-55 k
10/13/2018
10/13/2018
0.20
COMPZ5
CASING
RUNL
P
Bring pump up to 1.54 bpm, Diff=954
11,400.0
8,655.0
16:36
16:48
psi, PUW 38 k, remove liner length
from counters,
"' Note: TOL @ 8667.91'
10/13/2018
10/13/2018
1.80
DEMOB
WELLPR
DISP
P
Displace well to SW start tripping out
8,655.0
2,998.0
16:48
18:36
10/13/2018
10/13/2018
1.00
DEMOB
WELLPR
CIRC
P
Stop and S/I orbit valve, 1710 PSI
2,998.0
2,998.0
18:36
19:36
under valve, Pump 30 BBIs diesel
freeze proect
10/13/2018
10/13/2018
0.40
DEMOB
WELLPR
TRIP
P
Continue out of well
2,998.0
55.0
19:36
20:00
10/13/2018
10113/2018
0.70
DEMOB
WELLPR
PULD
P
At surface, PJSM lay down BHA on
55.0
0.0
20:00
20:42
dead well, Flow check - Good. Inspect
CT for flat spots/ wear.
10/13/2018
10/13/2018
1.00
DEMOB
WELLPR
CTOP
P
Pull checks out of UQC, Stab on well.
0.0
0.0
20:42
21:42
Equalize pressure above Orbit valve
and stroke open, Leave 500 PSI on
open side of valve. Final SITP=1852
PSI. Shut master, jet stack and rig.
10113!2018
10/13/2018
0.60
DEMOB
WELLPR
CTOP
P
Unstab injector, Install night cap and
0.0
0.0
21:42
22:18
blow down stack, rig, and TT line
1o/13/2618
10/13/2018
1.20
DEMOB
WHDBOP
OTHR
P
Vac out stack, Run bore scope in BOP
0.0
0.0
22:18
23:30
1
stack
10/13/2018
10/14/2018
0.50
DEMOB
MOVE
RURD
P
Start workin rig down checklist
0.0
0.0
23:30
00:00
10/14/2018
10/14/2018
6.00
DEMOB
MOVE
NUND
P
Work rig down checklist - Nipple down
0.0
0.0
00:00
06:00
stack, RELEASE RIG 06:00
Page 37/37 ReportPrinted: 10/15/2018
ConocoPhillips
ConocoPhillips (Alaska) Inc.
Kuparuk River Unit
Kuparuk 31 Pad
31-01 L1-02
50-029-21514-62
Baker Hughes INTEQ
Definitive Survey Report
19 October. 2018
BA ER
I UGHES
Ecompany
ConocoPhillips LwNEs a
ConocoPhilli'
ps Definttive Survey Report
Company
ConocoPhillips(Alaske) Inc.
Proposal
I(upamk River Unit
Site:
Kupamk 31 Pad
Well:
31WI
Waltham:
3601
Design:
31-01
Project
Kup suk River Unit, North Slope Alaska, United Stales
Map $,a".:
US Suite Plane 1927 (Exact solution) System Datum
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Alaska Z.. 04
Well 3WU
Local Coardinaui Reference:
Well 31-01
TVD Reference:
3601 C 71.00use (31411)
MID Reference:
31-01® 71.00usft (3101)
North Reference:
True
Survey calculation Method:
Minimum Curvature
Damhase:
EDT 14 Masks Pmducarr n
Well Position
+W3
0.00 use
Nonhing:
Using geodetic scale factor
+EI -W
0.00 use
Setting:
Position UnceftaiMy
Longhude:
0.00 use
Wellhead Elevation:
Welihore
31AiL142
Magnetics
Modal !lame
sample Dam
13GM2019
Design 31-0111-02
Audit Notes:
Veteran: 1.0 Phase: ACTUAL
Vertical Section'. Oepth From )TVD)
(-airy
71.00
W1I2016
Mean See Level
Using Well Reference Point
Using geodetic scale factor
6,007,265.50usR
Lantude:
508,056.44us0
Longhude:
usg
Ground Level:
Decfirutlon Dip Anole
16S5 60 93
Tie On Depth: 9,11699
eNl-S
(Nsf)
0.00
+E4V
(deft)
0.00
70° 25' 52.059 N
149° 56' 3.597 W
0.00 usn
Field Strenoth
(.7)
5],444
Direction
270.00
107191016 9:16:58PM Page 2 COMPASS 500014 Budd 85D
ConocoPhillips
ConocoPhillips
Deflniti"
Survey Report
Compary.
ConocoPhillips
(Kaska) Inc.
Local Loardinate Reference:
Web 3101
Project:
Kupamk River Unit
ND Reference:
awl@ 71.00usn(3101)
a"
Kupa uk 31 Pad
MD Reference:
awl @ 71.00usn
(3141)
Well'.
31-01
North Reference:
Tree
Wellbore:
31-01
Survey Calculation Memed:
Minimum Curvature
Design:
31-01
Database:
EDT 14 Alaska Production
Survey Program
Dab
Fre.
To
Survey survey
(.R)
(moth
Survey(Wellbom)
TOOT Name
Deacripm..
Sbn Date End Dab
100.00
0,600.00
3"1(3101)
GOT-MS
Schlumberger GCT
mullisnot
1/122001
8,680.00
8,767.41
31011-1O3 MW INC (314H 11O3)
MWD�INO_ONLY
MW INC ONLY FILLER
912512010 91252018
8797.13
9,116.39
3141 L1 O3 ISM (3W1
1-1O3)
MWD
MWD-Standad
912&2018 WHIMS
9,126.00
9,155]3
awl Ll-0 MW ING(31.O1 L1.02)
MWD-INOONLY
MWNINC ONLY FILLER
10110(2018 101102018
9.18].08
11,350.12
31011.1-02 SAM (31.011.1-02)
MWD
MWD-Standard
101192018 10113/2018
Survey
... _
.......
_
Map
Map
Memel
MD
!rte
AL NO
NO56
-Ni
aHVI
No-
Eaehng
OLS
Semion Survey Tool Name AD60tat190
Ned)
P)
P) (--ft)
loan)
loan)
(tan)
(ftl
n1.
(91001
m
8,11639
98 43
945
05 6.3.60
6,2]468
3,625.99
4,717.37
6,010,916.22
512.12. ]69.42
11A7
-0]t]3] MWO(3)
TIP
912600
9654
&26 6,344.59
6,273.59
3,635.43
4.71&81
6.010.925.66
512,]]9&5
8.04
-0]1&81 M INC_ONLY (4) KOP
9,156.33
9550
355.50 6.341.11
6,270.11
3,685.48
4]19.80
6,010,9:5.71
54,71.80
41.86
-0.71980 MND-MCONLY(4) IntaMolatedAaimuth
9,187.06
9748
34392 6,33]13
6,268.33
3.69545
471435
6.010,985V
512,]..33
3]49
4.714.36 MIND (S)
9,216.64
90.80
334.24 633319
6262.19
3,MM
4703.92
6,911,p12W
612.]558]
3284
4.]0392 uNuo(5)
9,246.96
9652
322.62 6,32910
6,259.18
3.748.31
4608.22
6,011039.50
512,74914
3&62
kSoLaa Meta, (5)
9,276.95
94.89
31937 6,326.19
6,255.19
3,769.92
4,86730
6,011060.c8
512719.60
40.99
{806.70 MWO(5)
9.305.09
06.25
ado" 6323.46
625245
3,788.16
4.6M.93
6,011 Man
512.899.82
34.75
.1,844.93 MWD(5)
9.33585
Sam
29347 6,32D.15
6,249AS
3,80106
4fi17,71
6.011090.9
51;666.59
23.16
-4,61]]1 MWD(5)
9,36518
96.25
10302 6.316.90
6,24590
3.0718]
4590.01
6.01110204
512,6418]
1.60
4590.01 MAD (5)
a.m i
95.47
292.52 6,313.84
6.24284
3,82349
4,56255
6,011,113.53
512,61171
3.09
4,55255 MWD (5)
9,42543
9395
...92 6,31143
6.240.43
3834.28
4,535.40
6011.12429
512.58]24
7.74
A535AD MWD(5)
9,455.83
9t L]
267.60 6,309..
6.230.99
3,84434
4,50676
6011.134.32
512,558.59
12.58
4am76 MWD(5)
9,455.58
91.14
286.14 6.301
6,238,32
3,853.
4478.32
6011".1al
512533.14
595
4478.32 NINA) (5)
9,515.14
09.51
203.80 6,309.15
6,238.15
3,86969
4449.]]
6011,150.61
512,501.59
903
-044937 MVW(5)
9545.
9566
263.91 6,301
6.236.62
3867.58
4,420.69
6,011.15734
512 4M51
278
4,420.0 MMD (5)
9.575.14
8043
281.83 631..38
o.,M
3,67462
4,38100
6.011,164.38
51244322
66t
-amn.40 MWD(5)
9.608.48
8&65
281.57 6311.23
6240.23
3,881.28
4,35816
6011,171.10
51241658
102
4,35036 NAND (S)
9637.31
Sam
279.95 6.31206
6,241.06
3,886.66
4.333.45
6,011,17645
512,38226
590
4.31945 vWD(5)
10/19,2018 3:16:58PM
Paye3
COMPASS 500914 Budd 85D
COnocoPhilllps
ConocoPhillips
Definitive Survey Report
BI�IlRV O
Company: ConocoPllMlps(Alaska) Inc.
Local Corordinate Reference:
Well 3WI
Project: Kupamk River Unit
TVD Reference:
3WIQ 71.00.ft(3141)
Site: louparuk 31 Pad
MD Reference:
314M @ 71.00use (31-01)
We11: 31-01
Nonh Reference:
True
Wellborn: 31-01
Survey Calculation Method:
Minimum Curvature
Oesl9n: 3601
Database:
EOT 14 Alaska Pmdmtbn
Survey
MO
Inc
Atl
TVD
Woes
+NIS
-Vm
flny
OLS
5 C6on
NOMltly
S
-Mae')
Survey Teot Name
Annotation
(deft)
PI
P)
(use)
(use)
lune)
(daln
(to
(It)
I
pp
9,666.90
8].5]
27603
6313.18
624219
3891 ]B
4, m, 25
fi,D111a10e
512.5,fi
669
-0,36125 MAID (5)
9.697.12
67.91
278.05
6,314.30
6243.30
3,89551
4,271.35
6,01i,16513
512,323.16
143
4.271.35 MD (5)
BR7,29
8690
278.30
6,315.22
6,24122
3,89938
4,241.43
6,011,11169]
512,MM
6.69
4,241.43 ME)
9,]5].24
9963
275.55
6315.53
6,244.53
3,902.37
4211.64
B.011,19202
512,261.45
4.12
4211.84 MWD (5)
9)11688
9071
276.49
6,315.30
6244.30
3,905.22
4.18214
8,011.194.04
512,233.94
2.81
4182.14 MM (5)
9.81781
92.6
278.24
fi314.0
624363
anod92
4,15145
6,01919650
612 20125
9.90
4,15145 MWD(6)
9,84]]9
91.00
282N
fi313.57
624257
3,914.21
412136
5.11,203.76
5121"'Aii
1290
4,121% MYW(5)
9,86168
9132
285.10
6.312.59
6,241.59
3,922.9
4089.04
6,011,211.70
512,140.83
9,04
4ON.4 M%N3(5)
90649
9128
26623
6,31196
6,240.90
3.923.0
4,20336
6.011,219.35
512,11515
11.63
4.63.38 MJUD(5)
99311.49
90.10
28739
8,311.59
6,240,59
3.939.03
4,0%.80
6,011,228.49
51200.59
462
4.034.0 MND (5)
9,07.01
8966
20]36
6,311,63
6,2b63
3.S47 55
4,00]58
6,011,236.90
512.059.36
1.83
4,00759 MND(6)
9,05.07
9060
28777
6311.55
6,240.55
3,956.01
3.90.04
6,01124542
512D32.60
392
190964 NAND (5)
10,02]]3
9083
285.00
6311.12
624012
3,90 .50
3,9495(1
6.011,25407
512,01.35
5.44
3949.59 MND(5)
10057 28
9138
2M.40
6,310.55
6239.55
3,97314
3,92132
6,011,mWm
511.9,20
2.30
3.921.23 MWD (5)
10,007.17
eY/9
286.70
6,309.46
6238.40
3,902.27
3,0WN
6011,27157
Si1944.34
469
-3.092.59 MWD (5)
10.118.0
91.26
28209
630637
623].3]
3,99126
3,8630]
6,01130.53
511,91401
60
1963.07 MD (5)
10.148.15
89.29
288.10
6.30884
6337,N
4.00.36
3,834.38
6.011309.E0
51180]1
7.53
41.B%.311 "D (5)
10.17].53
09.14
28642
6,30.0
6,237,66
4,009.57
3,8045
6,011,298.70
51185610
1.13
4,006.45 MWD(5)
10.20294
07.63
2(e69
6309.43
6,23643
4,018.73
3,7]].50
6,011,307.91
511.829.=
687
3,7]150 MWD(5)
29.23665
0717
284.38
6,310.73
6339.73
4,026.94
3.747.94
6,011,316.09
511799.65
8.02
3747.94 101141)(5)
10,270.55
...
28378
6,312.37
6,241.37
4.034.68
3.]1].04
6011,3230D
511,]60.]5
1.97
3)1].04 MND(6)
10,29541
00.16
282,84
6.31344
6.24244
4.NO,M
3,692.86
6011.329.45
5117..%
674
-3,692.66 MND (5)
10,325.13
8745
28340
6.31457
6,24358
4.47,05
3,663.92
6011,333.10
511,715.63
350
4,0392 MAID (5)
1635388
89.23
28078
6.315.41
6244.41
4053.07
3.635.83
601134209
511.607.52
11.01
363583 MAID (5)
10,387.35
9126
27753
6.31&&
6.2..26
4,05640
3,60279
6,011,30.38
511.85440
11.45
3,602.]9 MND(5)
10,413.29
9325
2740
6,31434
6.2Q,N
4,0130
3.576@
6,o1i,Zi50,M
51162662
1281
-3,57692 MWO(5)
10,.7.51
9320
2730
6,31232
6241.32
4,.%
364294
6.011362.48
511594.0
5.18
154294 MD (5)
10,477.31
966.0
269.87
6,311.0
6,240.47
4,06432
3.5139
601135321
51156407
15.0
41.513.17 MD (5)
10508,21
8579
WT..0
6,312.59
6.24159
4,05371
348231
60H.3520
511534.01
15.30
3,48231 MWD(5)
10.530.75
83.67
20.02
6,315.34
0,24434
4,01.70
3,451,96
6011.35058
5115010
11.60
3,4510 MWD(5)
1056619
84.13
man
6,318.21
6,247,21
4,050.38
3ANB0
6,011,347,9
5114]B.W
140
3342486 MWD(5)
10/1911018 3: 1658M
Pa0e4
COMPASS 500014 Budd 850
ConoeoPhillips
lbqk� •
Cbnoc Phllfips
Definitive Survey Report
Comparry:
ConO lai111pe(Alaska) Inc.
Local Coanllrob Refannce:
Mll 3"1
P.J.M.
Kupamk Ramr
Unit
ND Refinance:
31-01® 71.00usR(3401)
She:
Kupamk 31
Pad
MD Reference:
31411@71.00ush(3141)
seep:
31-01
North Reference:
True
Wellbore:
31-01
Survey Calculation Method
Minimum Curnitu,
Design:
3141
Database.
EDI 14 Alaska
Production
Survey
Map
Map
Vertical
MO
Irc
Ab
NO
NOSS
♦WS
+6-W Alarming
Alarming
Eas11n0
Seggryey Tool Name
Annotation
(usR)
19
(1)
(UM"
ai
lush)
loop)
Vi)
rt1
I ft)
10596.%
83.59
25819
6.321.]]
6250]]
4052.85
3394.03 fi0111134t 61
51111C4fi.55
'
1023
?394.03 "D (5)
I 10,62]2]
8325
25,26
6,325,31
6,25451
4.045.69
3,36&112 6,011,33442
511.41235
1150
3,3f562 MWD (5)
10,07.0
83.82
250.50
6,320,%
6,251
4,0311.50
3,336.69 6,011.325.211
511,388,43
1237
433669 "D (5)
10.687.60
85.48
246,5
6,331,74
6,250.74
4.025.61
3,350.0 6.011.314.28
511,3%,P.
KM
430903 MWD(5(
10,]18,8]
88.10
243.91
fi333.49
6,26249
4.01257
3,260]] 6.011.301.21
511,33254
1190
4.281 MW➢(5(
I
10,25010
09.75
24117
6,33407
6263.07
3,99a,P
325203 6,1)1
511,304,86
1024
425305 MWD(5)
10,701
9009
237.88
6334.12
626112
3,902.62
3,226.63 6.Ot1P120
511,278."
10]0
4.M&63 eau (6)
10,01153
90.45
231.99
6.33397
6,262.97
3,965.40
3,21)116 6,011,253.95
51125299
1271
y2T.16 MhD(5)
10,839A7
045
Mai
6,333.99
IsMAKO
3,946.13
3,179.20 6.01123666
51
16.02
-0.179X34 MAID(5)
10.81
88.65
22371
6.334.51
&20.7.51
3.11
3.155.34 6,011.21607
511.08.M
18.99
3.155.% MAo(5)
10.%0.47
81
21282
6.250.82
62ei
3,904.19
3,13].00 601"Milm
511.101
20.33
3.137.06 MAD (5)
I
10,%0.32
92.15
215.06
6,334.41
6.26341
311 10
3.119.33 601116&%
511,1719
1216
3,11933 MD (5)
�
10961.51
9055
207.31
6,33350
6.02.67
3,85353
3,103.20 6011,141.50
511,155.9
25.36
-0,134.20 MD (5)
!
10,50011
91.78
20&92
6.31
6,02.09
3,80.31
3,%9.R 6011,116.]6
511.14177
208
3,C09.R MWD (5)
11,DM.49
91.5,
213.24
6,33222
6,01.22
3,802.31
3,D]4.% 6.011.090.74
51110,08
1424
3,07485 NOW (5)
11M i
90.50
2120
6,331.6)
fi250,63
3.]]0.24
3,05/,04 60110%,%
51115010
13.04
3857.04 WD (6)
j
11,0800
88]1
219.51
6,331.]6
6,25016
3.75.55
303320 6,011,Mlai
511,0%.36
1016
403&20 MAD (6)
11,11041
87.91
222.015
6Miss
6,0185
3,731.69
3,01655 601100,07
511,0]0%
884
-0,018.55 MWU(5)
11.141%
87,85
20.61
6333.70
6,02.70
3.709.60
2997,35 6.010,997.87
51100..0
11,58
-0.98235 MrW(5)
11,17039
MAO
22880
6334.02
603.02
3.68969
29]5.84 6.010.976.03
511,027.99
1D.%
-2.97584 MAD(S)
11,201,49
111
M.63
630.96
6264W
3,670.01
2,951,79 fi010,95633
511,003,97
1237
-2,951]9 MAD (5)
1123021
MAD
236,20
6.336,84
6,2%.84
3,03.31
2,928." 6,010,00.61
510,91
13.02
-2,928." MAO(5)
110103
0585
234%
6.33620
6,0226
3,M60
2,902.58 6,010,824.87
510.95.81
11.31
-29@.59 MAD(5)
11,29011
0601
Me,
6.340.34
180934
3,621.54
2.677]4 6,010,950,89
510,929.98
6.13
-2.0]]24 MD (5)
1131966
86.19
24379
6.0235
6271,36
3,60)]2
2051]6 6,010,8%,94
510.934@
1335
3,&510 MAO(5)
11350.12
8680
247.43
6.3".1,9
6.273.19
3,596.17
2,82407 6.010,81
610,0768
12.15
-2.82407 MD (6)
1140000
86.0
24243
6.346.89
6,275.89
3,5]fi05
2,]]8.03 60ID,%419
510,030.39
O.W
-277800 PROJECTED to TO
IW19MI8 3:16:59PM
Pa's
COMPASS 500014 Sued 80
WMA F16
BAKER
HUGHES
To:
Date:
November 6, 2018
Abby Bell
AOGCC
333 West 70' Ave, Suite 100
Anchorage, Alaska 99501
From:
2.18089
29975
Letter of Transmittal
Michael Soper
Baker Hughes INTEQ
795 East 90 Avenue
Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
3I-OlLlPB1
3I-OILl-03
3I-OIL1-04
3I -01L1-05
31-OlLl
31-OIL1-02
(6) Total prints
RECEIVED
NOV 0 7 2018
AQGCC
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Michael Soper, Baker Hughes, Project Engineer
Michael. Soper@BakerHughes.com
ConocoPhillips
ConocoPhillips (Alaska) Inc.
Kuparuk River Unit
Kuparuk 31 Pad
31-01 L1-02
50-029-21514-62
Baker Hughes INTEQ
Definitive Survey Report
19 October, 2018
BA ER
I UGHES
a GE company
29975
Project
ConocoPhillips
ConocoPhillips
Definitive Survey Report
System Datum:
Company: ConocoPhillips (Alaska) Inc.
Local Coordinate Reference:
Well 31-01
Project: Kuparuk River Unit
TVD Reference:
31-01 @ 71.00usft (31-01)
Site: Kuparuk 31 Pad
MD Reference:
31-01 @ 71.00usft (31-01)
Well: 31-01
North Reference:
True
Wellbore: 31-01
Survey Calculation Method:
Minimum Curvature
Design: 31-01
Database:
EDT 14 Alaska Production
Project
Kuparuk River Unit, North Slope Alaska, United Slates
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Alaska Zone 04
Well
31-01--._.__.
Well Position
+NI -S 0.00 usft
Northing:
+E/.W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
31-0lLl-02
Magnetics
Model Name Sample Date
BGGM2018 9/1/2018
Design
31-01L1-02W��m—�_W
Audit Notes:
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
6,007,285.50usft
508,056.44usft
usft
Declination
(1)
1695
Version: 1.0 Phase: ACTUAL Tie On Depth: 9,116.39
Vertical Section: Depth From (TVD) +N/ -S
(usft) (usft)
i 71.00 0.00
Latitude:
Longitude:
Ground Level:
Dip Angle
(I
80 93
+E/ -W Direction
(usft) (1)
0.00 270.00
700 25' 52.059 N
1490 56'3,597 W
0 00 usft
Field Strength
oT)
57 444
10/192018 3: 16.58PM Page 2 COMPASS 5000. 14 Build 85D
ConocoPhillips9tN
FS
ConocoPhillips Definitive Survey Report 9
Company:
Project:
Site:
Well:
Wellbore:
Design:
Survey Program
ConocoPhillips (Alaska) Inc.
Kuparuk River Unit
Kuparuk 31 Pad
31-01
31-01
31-01
Date
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 31-01
31-01 @ 71.00usft (31-01)
31-01 @ 71.00usft (31-01)
True
Minimum Curvature
EDT 14 Alaska Production
From
To
Survey
Survey
(usft)
(usft)
Survey (Wellbore)
Tool Name
Description
Start Date
End Date
100.00
8,600.00
31-01 (31-01)
GCT -MS
Schlumberger GCT multishot
1/12/2001
8,680.00
8,767.41
31-01LI-03 MWD-INC(31-011-1-03)
MWD -INC -ONLY
MWD -INC -ONLY FILLER
9/25/2018
9/25/2018
8,797.13
9,116.39
31-0111-03MWD(31-0111-03)
MWD
MWD -Standard
9/25/2018
9/29/2018
9,126.00
9,156.33
31-01LI-02 MWD -INC (31-0111-02)
MWD -INC -ONLY
MWD -INC -ONLY -FILLER
10/10/2018
10/10/2018
9.18208
11,350.12
31-01 L1-02 MWD (31-0111-02)
MWD
MWD- Standard
10/10/2018
10/13/2018
Survey
101192018 3: 16.58PM Page 3 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+EI -W
DLS
(usft)
(1)
n
(usft)
(usft)
(usft)
(usft)
Northing
Easting
(°/100')
Section
Survey Tool Name
Annotation
(ft)
(ft)
(ft)
9,116.39
96.43
9.05
6,345.68
6,274.68
3,625.99
4,717.37
6,010,916.22
512,769.42
11.47
4,717.37
MM (3)
TIP
9,126.00
96.54
8.28
6,344.59
6,273.59
3,635.43
4,718.81
6,010,925.66
512,770.85
8.04
-0,718.81
MWD-INC_ONLY (4)
KOP
9,156.33
96.59
35550
6,341.11
6,270.11
3,665.48
4,719.80
6,010,955.71
512,77180
41.86
4.719.80
MWD-INC_ONLY (4)
Interpolated Azimuth
9,187.08
97.48
343.92
6,337.33
6,266.33
3,695.45
4,714.36
6,010,985.67
512,766.33
37.49
4,714.36
MWD (5)
9,216.64
98.60
334.24
6,333.19
6,262.19
3,722.76
4,703.92
6,011,012.97
512,755.87
32.64
4,703.92
MWD (6)
9,246.95
96.52
322.62
6,329.18
6,258.18
3,748.31
4,688.22
6,011,038.50
512,740.14
38.62
4,688.22
MWD (5)
9,276.95
94.89
310.37
6,326.19
6,255.19
3,769.92
4,667.70
6,011,060.08
512,719.60
40.99
4,667.70
MM (5)
9,305.09
96.25
300.64
6,323.45
6,252.45
3,786.16
4,644.93
6,011,076.30
512,696.82
34.75
4,644.93
MWD (5)
9,335.85
96.06
29347
6,320.15
6,249.15
3,806.06
4,617.71
6,011,090.17
512,669.59
23.18
4,617.71
MWD (5)
9,366.18
9625
293.02
6,316.90
6,245.90
3,811.97
4,590.01
6,011,102.04
512,641.87
1.60
4,590.01
MM (5)
9,396.11
9547
29252
6,31384
6,24284
3,82349
4,562.55
6,011,113.53
512,614.41
3.09
4,562.55
MWD(5)
9,42543
93.96
290.82
6,311.43
6,240.43
3,834.28
4,535.40
6,011,124.29
512,587.24
7.74
4,53540
MWO(5)
9,455.83
9147
28788
6,309.99
6,238.99
3,844.34
4,506.76
6,011,134.32
512,558.59
12.66
4,506.76
MM (5)
9,485.58
91.14
286.14
6,309.32
6,238.32
3,853.04
4,478.32
6,011,142.99
512,530.14
5.95
4,478.32
MWD (5)
9,515.14
89.51
283.88
6,309.15
6,238.15
3,860.69
4,449.77
6,011,150.61
512,501.59
9.43
4,449.77
MWD (5)
9,545.09
88.68
283.81
6,309.62
6,238.62
3,867.86
4,42069
6,011,157.74
512,472.51
2.78
4,420.69
MWD (5)
9,575.14
88.43
281.83
6,310.38
6,239.38
3,874.52
4,391.40
6,011,164.38
512,443.22
6.64
4,39140
MWD (5)
9,608.48
W65
28157
6,311.23
6,240.23
3,881.28
4,358.76
6,011,171.10
512.410.58
1.02
-4,358.76
MWD (5)
9,637.31
88.%
279.95
6,31206
6,241.06
3,886.66
4,33045
6,011,17645
512,38226
598
-4,330.45
MW (5)
101192018 3: 16.58PM Page 3 COMPASS 5000.14 Build 85D
ConocoPhillips
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips (Alaska) Inc.
Local Co-ordinate Reference:
Well 31-01
Project:
Kuparuk River Unit
TVD Reference:
31-01 @ 71.00usft (31-01)
Site:
Kupamk 31 Pad
MD Reference:
31-01 @ 71.00usft (31-01)
Well:
31-01
North Reference:
True
Wellbore:
31-01
Survey Calculation Method:
Minimum Curvature
Design:
31-01
Database:
EDT 14 Alaska Production
Survey
Annotation
BA%H'1
10/19/2018 3: 16:58PM Page 4 COMPASS 5000.14 Build 85O
Map
Map
Vertical
MD
Inc
Azi
TvD
TVDSS
-NI-S
+El -W
Northing
Easting
OLS
Section
lust[)
V)
(1)
(usft)
(usft)
(usft)
(usft)
(°1100')
Survey Tool Name
(ft)
(ft)
(ft)
9,666.90
87.57
278.03
6,313.18
6,242.18
3,691.28
4,301.25
6,011,181.04
512,353.06
669
4,301.25
MWD(5)
9,697.12
87.91
278.06
6,314.38
6,243.38
3,895.51
4,271.35
6,011,185.23
512,323.16
1.13
4,271.35
MWD (5)
9,72729
88.90
276.30
6,315.22
6,244.22
3,899.28
4,241.43
6,011,188.97
512,293.23
6.69
4,24143
MWD(5)
9,757.24
89.88
275.55
6,315.53
6,244.53
3,902.37
4,211.64
6,011,192.02
512,263.45
4.12
4,21164
MWD (5)
9,786.88
90.71
275.49
6,315.38
6,244.38
3,905.22
4,182.14
6,011,194.84
512,233.94
2.81
4,182.14
MWD(5)
9,817.81
9206
278.24
6,31463
6,243.63
3,908.92
4,151.45
6,011,198.50
512,203.25
9.90
4,151.45
MWD(5)
9,847.79
92.00
282.11
6,313.57
6,242.57
3,914.21
4,121.95
6,011,203.76
512,173.76
12.90
4,121.96
MWD(5)
9,881.68
91.32
285.10
6,312.59
6,241.59
3,922.17
4,089.04
6,011,211.70
512,140.83
9.04
4,089.04
MWD (5)
9,908.49
91.29
288.22
6,311.98
6240.98
3,929.85
4,063.36
6,011,219.35
512,115.15
11.63
4,06336
MWD (5)
9,938.49
90.18
287.39
6,311.59
6,240.59
3,939.03
4,034.80
6,011,228.49
512,086.59
4.62
4,034.80
MWD (5)
9,967.01
89.66
287.36
6,311.63
6,240.63
3,947.55
4,007.59
6,011,236.98
512,059.36
1.83
4,007.59
MWD (5)
9,995.07
90.68
287.77
6,311.55
6,240.55
3,956.01
$,980.84
6,011,245.42
512,032.60
3.92
-3,980.84
MM (5)
10,027.73
90.63
286.00
6,311.12
6240.12
3,965.50
3,949.59
6,011,254.87
512,001.35
5.44
-3,949.59
MM (5)
10,057.28
91.38
286.40
6310.55
6,239.55
3,973.74
3,92122
6,011,263.08
511,972.97
2.30
-3,921.22
MWD (5)
10,087.17
92.79
286.78
6309.46
6,238.46
3,982.27
3,89259
6,011,271.57
511,944.34
4.89
-3,892.59
MWD (5)
10,11805
91.26
287.09
6,308.37
6,237.37
3,991.26
3,86307
6,011,280.53
511,914.81
5.06
-3,863.07
MWD (5)
10,148.15
89.23
288.10
630824
6,237.24
4,000.36
3,834.38
6,011,289.60
511,886.11
7.53
-3,834.38
MM (5)
10,177.56
89.14
288.42
6,30866
6,237.66
4,009.57
3,806.45
6,011,29878
511,858.18
1.13
-3,806.45
MWD (5)
10,207.94
87.97
285.69
6,30943
6,238.43
4,018.73
3,777.50
6,011,30791
511,829.22
6.87
-3,777.50
MM (5)
10,238.65
87.17
284.36
6,31073
6,239.73
4,026.94
3,74794
6,011,316.09
511,799.65
802
-3,747.94
MWD(5)
10,270.55
86.93
283.78
6,312.37
6,241.37
4,03469
3,71]04
6,01132380
511,768.75
1.97
-3,717.04
MM (5)
10,295.41
88.16
282.64
6,31344
6,24244
4,040.36
3,692.86
6,011,329.45
511,744.56
6.74
-3,692.86
MM (5)
10,325.13
87.45
283.40
6,314.57
6,243.58
4,047.05
3,663.92
6,011,336.10
511,715.62
3.50
-3,663.92
MWD (5)
10,353.88
89.23
280.78
6,315.41
6,244.41
4,053.07
3,635.83
6,01134209
511,687.52
11.01
-3,635.83
MM (5)
10,38735
9126
277.53
6,315.26
6,244.26
4,058.40
3,602.79
6,011,347.38
511,654.48
1145
-3,602.79
MWD (5)
10,413.39
93.25
274.85
6,314.24
6,243.24
4,061.20
3,576.92
6,011,350.16
511,628.62
1281
-3,576.92
MWD (5)
10,447.51
93.20
273.08
6,312.32
6,241.32
4,063.56
3,542.94
6,011,352.48
511,594.64
5.18
4,542.94
MWD (5)
10,477.31
90.06
269.87
6,311.47
6,24047
4,064.32
3,513.17
6,011,353.21
511,564.87
15.06
-3,513.17
MWD (5)
10,508.21
8579
267.84
6,312.59
6,241.59
4,063.71
3,482.31
6,011,352.56
511,534.01
15.30
-3,482.31
MWD (5)
10,538.75
83.87
264.82
6,315.34
6,244.34
4,061.76
3,451.96
6,011,350.58
511,503.66
1168
-3.451.96
MWD (5)
10566.19
84.13
260.95
631821
6,24721
405838
3,42488
6011,347.17
511,47660
14.06
-3424.88
MP (5)
Annotation
BA%H'1
10/19/2018 3: 16:58PM Page 4 COMPASS 5000.14 Build 85O
ConocoPhillips
Company:
ConocoPhillips (Alaska) Inc.
Project:
Kuparuk River Unit
Site:
Kuparuk 31 Pad
Well:
31-01
Waltham:
31-01
Design:
31-01
Survey
ConocoPhillips
Definitive Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 31-01
31-01 @ 71.00usft (31-01)
31-01 @ 71.00usft (31-01)
True
Minimum Curvature
EDT 14 Alaska Production
Annotation
10/19/2018 3A6:58PM Page 5 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+NI -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
V)
(1)
(usft)
(usft)
(usft)
(usft)
('1100')
Survey Tool Name
(ft)
(ft)
(ft)
10,596.96
8258
25819
6,32177
6,25077
4,052.85
3,394.83
6,011,341.61
511,446.55
1023
-3.394.83
MWD(5)
10,627.27
83.25
254.26
6,325.51
6,254.51
4,045.69
3,365.62
6,011,33442
511,417.35
13.06
-3,365.62
MWD(5)
10,657.83
83.82
250.50
6,328.96
6,257.96
4,036.50
3,336.69
6,011,325.20
51138843
12.37
3,336.69
MWD (5)
10,687.69
85.48
246.54
6,331.74
6,260.74
4,025.61
3,309.03
6,011,314.28
511,360.79
14.33
3,309.03
MWD (5)
10,718.87
88.10
243.91
6,333.49
6,262.49
4,012.57
3,280.77
6,011,301 21
511,332.54
11.90
-3,280.77
MWD (5)
10,750.10
89.75
241.17
6,33407
6,263.07
3,998.17
3,253.06
6,011,286.78
511,304.86
10.24
-3,253.06
MWD (5)
10,780.78
90.09
237.88
6,334.12
6,263.12
3,982.62
3,226.63
6,011,271.20
511,278.44
10.78
-3,22663
MWD (5)
10,811.53
90.46
233.99
6,333.97
6,262.97
3,965.40
3,201.16
6,011,253.95
511,252.99
12.71
3,201.16
MWD (5)
10,839.47
8945
229.63
6,333.99
6,262.99
3,948.13
3,179.20
6,011,236.66
511,231.06
16.02
-3,179.20
MWD(5)
10,870.92
88-65
22371
6,334.51
6,263.51
3,926.56
3,156,34
6,011,215.07
511,208.22
18.99
3,156.34
MM (5)
10,900.47
89.79
217.82
6,334.92
6,263.92
3,904.19
3,137.06
6,011,192.68
511,188.98
20,30
3,137.06
MWD (5)
10,930.32
92.15
215.W
6,33441
6,263.41
3,880.18
3,119.33
6,011,168.66
511,171.27
12.16
-3,119.33
MM (5)
10,961.51
90.55
207.31
6,333.67
6,262.67
3,853.53
3,103.20
6,011,141.99
511,155.17
25.36
3,103.20
MM (5)
10,990.11
91.78
208.92
6,333.09
6,262.09
3,828.31
3,089.72
6,011,116.76
511,141.72
7.08
3,089.72
MWD (5)
11,020.49
91.50
213.24
6,332.22
6,261.22
3,802.31
3,074.05
6,011,090.74
511,126.0
14.24
3,074.05
MM (5)
11,049.97
9080
217.26
6,331.63
6,260.63
3,776.24
3,057.04
6,011,066.66
511,109.10
13.84
3,057.04
MWD (5)
11,03020
88.71
219.51
6,331.76
6,260]6
3,754.55
3,038.28
6,011,042.95
511,090.36
10.16
-3,038.28
MVID(5)
11,11041
87.91
222.06
6,332.65
6,261.65
3,731.69
3,018.55
6,011,020.07
511,070.66
8.84
-3,018.55
MWD (5)
11,141.05
87.85
225.61
6,333.78
6,262.78
3,709.60
2,99735
6,010,997.97
511,049.48
11.58
-2,997.35
MWO(5)
11,170.39
88.10
228.80
6,334.82
6,263.82
3,689.69
2,975.84
6,010,978.03
511,027.99
10.90
-2,975.84
MWD(5)
11,20149
8770
232.63
6335.96
6,264.96
3,670.01
2,951.79
6,010,958.33
511,003.97
12.37
-2,951.79
MWD (5)
11,230.21
88.80
23620
6,336.84
6,265.84
3,653.31
2,92844
6,010,941.61
510,980.64
13.00
-2,92844
MWD (5)
11,261.03
85.85
238.06
6,338.28
6,267.28
3,636.60
2,902.59
6,010,924.87
510,954.81
11.31
-2,902.59
MWD (5)
11290.11
86.01
239.84
6,340.34
6,269.34
3,621.64
2,877.74
6,010,909.89
510,929.98
6.13
-2,877.74
MWD (5)
11,31966
86.19
243.79
6,342.35
6,271.35
3,607]2
2,851.76
6,010,895.94
510,904.02
13.35
-2,851.76
MWD (5)
11350.12
86.90
24743
6,344.19
6,273.19
3,595.17
2,824.07
6,010,883.36
510,876.35
12.15
-2,824.7
MWD(5)
11,400.03
86.90
24743
6,346.89
6,275.89
39605
2,77808
6,010,864.19
510,830.38
0.00
-2,77808
PROJECTED to TO
Annotation
10/19/2018 3A6:58PM Page 5 COMPASS 5000.14 Build 85D
BA ER Qi PRINT DISTRIBUTION LIST
F1UGHES
a GE company
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME
31-O1L1-02
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT
Alaska
118039
29951
ie sign and return one copy of this transmittal form to:
DcoPhillips Alaska, Inc.
Osterkamp (WNS Petroleum Technician)
G Street.
norage, Alaska 99510
LOG TYPE GR - RES
LOG DATE October 6, 2018
AUTHORIZED BY Patrick Rider
EMAIL Patrick Rideronbakerhughes.corn TODAYS DATE October 31, 2018
Revision
STATUS Final Reptacement: No Details:
Rev. Requested by: ---
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. SOX)
PERSON ATTENTION
V
1 BP North Slope.
EOA, PROC, PRB-2010fce 1091
D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 Conoco Phillips Alaska Inc.
Atm: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99510
3 ' ExxoaMubil,AIasIw
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4'IState of Alaska -AOGCC
,Atm: Natural Resources Technician II
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
FIELD I
FINAL
CD/DVD
FINAL
PRELIMLOGS
(las, dlis,META,
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTSI
# UF tKIN 16#
OF COPIES
# OF COPIES
# OF COPIES
4 4 4 is
ea.,
0 1 0 1 0 1 0 1 0
0 i o 0
5 DNR -Division ofOil&Gas 0 0 1 0 1
Attn: Resource Evaluation
.550 West 7th Avenue, Suite 1100
Anchorage, Alasla 99501
Le Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc. 0 0 0
Petrotechnical Data Center, LR2-1
1900 E. Benson Blvd.
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE: 0 1 3 0 0
THE STATE
01ALASKA
GOVERNOR BILL WALKER
William R. Long
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3I-OIL1-02
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 218-089
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska, gov
Surface Location: 344' FSL, 179' FWL, SEC. 31, TI 3N, R9E, UM
Bottomhole Location: 1327' FNL, 2071' FWL, SEC. 31, T13N, R9E, UM
Dear Mr. Long:
Enclosed is the approved application for the permit to redrill the above referenced development
well.
The permit is for a new wellbore segment of existing well Permit 185-307, API 50-029-21514-00-
00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
Chair
J
DATED this day of August, 2018.
STATE OF ALASKA
AL, A OIL AND GAS CONSERVATION COMM ON
PERMIT TO DRILL
20 AAC 25.005
JUL 2 0 2018
i
1 a. Type of Work:
tb. Proposed Well Class. Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑
1 c. Specify if well is. proposed for.
Drill [:1 Lateral ❑�
Stratigraphic Test El Development - Oil ❑� ' Service - Winj F_] Single Zone ❑�
Coalbed Gae'"u Gas Hydrates ❑
Redrill❑ Reentry❑
Exploratory - Oil ❑ Development - Gas❑ Service -Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket ❑✓ . Single Well ❑
11. Well Name and Number:
ConocoPhillips Alaska, Inc.
Bond No. 5952180
Kuparuk Riv Unit 31-01 Li -02
3. Address:
6. Proposed Depth:(: G 2-' 3
12. Field/Pool(s):
PO Box 100360 Anchorage, AK 99510-0360
MD: 11,925 ' TVDS -' 6212
Kuparuk River
Kuparuk River Oil
4a. Location of Well (Governmental Section):
7. Property Designation: / o
Surface: 344' FSL, 179' FWL, Sec. 31, T13N, l UM
ADL 25521
Top of Productive Horizon:
8. DNR Approval Number:
13. Approximate Sp Date:
'71to l9
1239' FNL, 564' FEL, Sec. 31, T13N, R9E, UM
LOMS 83-130
8/ 018
Total Depth:
9. Acres in Property:
14. Distance to barest Property: VT
1327' FNL, 2071' FWL, Sec. 31, T13N, R9E, UM
2555
18,990'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 71
15. Distance to Nearest Well Open
Surface: x- 508056 y- 6007286 Zone- 4
GL / BF Elevation above MSL (ft): 40
to Same Pool: 513' (31-03)
16. Deviated wells: Kickoff depth: 9200 feet •
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 102 degrees
Downhole: 5456 Surface: 4829
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.6# L-80 ST -L 2840
9085 11,925 ' Un -Cemented
19, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured).
9030 6542 N/A 8919 6460 8782
Casing Length Size Cement Volume MD TVD
Conductor/Structural 73' 16" 274 Sx CS II 104' 104'
Surface 4315' 9-5/8" 1650 Sx AS III & 320 Sx Class G 4346' 3304'
Intermediate
Production 8986' 7" 300 Sx Class G & 175 Sx AS 1 9010' 6528'
Liner
Perforation Depth MD (ft): Perforation Depth TVD (ft):
8734-8760,8770-8798 6326-6345,6352-6373
Hydraulic Fracture planned? Yes❑ No ❑�
20. Attachments: Property Plat ❑
Drilling Program v. togPam
Shallow Hazard lentse
Divertter Sketch
B
Seabed Report B Drilling geFlu d Pr
e 20 AAC 25.050 requiremlot
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval. Contact Name: William R. Long
Authorized Name: William R. Long Contact Email: William.R.LonclaCOP.com
Authorized Title: Staff CTD E gine Contact Phone: 907-263-4372
/y X-4
Authorized Signature: Date:
Commission Use Only
Permit to Drill
'rj—'b
API Number: ,}
Permit Approval
See cover letter for other
Number: .LJ
50-(/Z�"Z-�� �(?��
Date: 11requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, as hydrates, or gas contained in shales:
Other: Samples req'd: Yes ❑ No Mud log req'd: Yes ❑ Nov
B o P rest -t-'o 49 ea 'P5' -'J H12S measures: Yes 0?" No Directional svy req'dYes [o No E]
/tn9n v9l anr fJcl CVG Vt �l r } Z
Inclination -only svY req'd: Yes❑ NOVd
SjpacingC25e�tln req'd: Yes❑ No[K
V&r/q P7 e- b /" c2S 6
o2
Post initial injection MIT req'd: Yes❑ NorPr
/S 7',0 2%V-lcl�/�of��ur:�i iv
be' ariy pvl/ i't 121av9 Vl-h r P4 rt1/7 I / -
APPROVED BY f
Approved by: COMMISSIONER THE COMMISSION Date: 1?J 1'_J
1/77Th
/'i/ �f /ZQ` /�f Submit Fonn and
Form 10-001 Revised 5/2017 s ermrt is va id foriii rptt(. Jtl1b 4at�oftpproval per 20 AA� 05 gi ) ftachments in Duplicate
(l' 111 _ I N 'A L /Y P 7 y'illqo
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
July 20, 2018
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the KRU 31-01
(PTD# 185-307) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin in August 2018. The objective will be to drill sig laterals, KRU 31-01 L1,
31-011-1-01, 31-011-1-02, 31-01 L1-03, 31-011-1-04, and 31-01 L1-05, targeting the Kuparuk A -sand interval.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20-
AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of
being limited to 500' from the original point.
Attached to this application are the following documents:
- Permit to Drill Application Forms (10-401) for
31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01L1-05
- Detailed Summary of Operations
- Directional Plans for 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01L1-05
- Current wellbore schematic
- Proposed CTD schematic
If you have any questions or require additional information, please contact me at 907-263-4372.
Sincerely,
William R. Long
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Kuparuk CTD Laterals
31-011-1, 31-01 L1-01, 31-01 L7-02, 31-01 L1-03, 31-01 L1-04, and 31-01 L1-05
Application for Permit to Drill Document
1.
Well Name and Classification........................................................................................................ 2
(Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b))...................................................................................................................2
2.
Location Summary.......................................................................................................................... 2
(Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................................. 2
3.
Blowout Prevention Equipment Information................................................................................. 2
(Requirements of 20 AAC 25.005(c)(3))..................................................................................-............................................................2
4.
Drilling Hazards Information and Reservoir Pressure.................................................................. 2
(Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2
5.
Procedure for Conducting Formation Integrity tests................................................................... 2
(Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2
6.
Casing and Cementing Program.................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3
7.
Diverter System Information.......................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(7))...................................................................................................................................................3
8.
Drilling Fluids Program.................................................................................................................. 3
(Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3
9.
Abnormally Pressured Formation Information.............................................................................4
(Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4
10.
Seismic Analysis............................................................................................................................. 4
(Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4
11.
Seabed Condition Analysis............................................................................................................ 4
(Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4
12.
Evidence of Bonding...................................................................................................................... 4
(Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4
13.
Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4
Summaryof Operations...................................................................................................................................................4
LinerRunning................................................................................................................................................................6
14.
Disposal of Drilling Mud and Cuttings.......................................................................................... 6
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 6
15.
Directional Plans for Intentionally Deviated Wells....................................................................... 7
(Requirements of 20 AAC 25.050(b)) ............................ -.................................................... ....................... ............................................. 7
16. Attachments....................................................................................................................................7
Attachment 1: Directional Plans for 31-01 L1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-01L1-04, and 31-01L1-05 laterals.
.........................................................................................................................................................................................7
Attachment 2: Current Well Schematic for 31-01.............................................................................................................7
Attachment 3: Proposed Well Schematic for 31-01 L1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-0111-04, and 31-01 Lt -05
laterals.............................................................................................................................................................................7
Page 1 of 7 June 27, 2018
PTD Application: 31-011-1, 31-011-1-01, 31-01L1-02, 31-011-1-03, 31-011-1-04, and 31-0l Ll -05
1. Well Name and Classification
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(6))
The proposed laterals described in this document are 31-011-1, 31-011-1-01, 31-01L 1 -02, 31-011-1-03, 31-011-1-04,
and 31-01 L1-05. All laterals will be classified as "Development -Oil' wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 forms for surface
and subsurface coordinates of each of the laterals.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4900 psi. Using the
maximum formation pressure in the area of 5456 psi at the datum in 3N-05 (i.e. 16.7 ppg EMW), the
maximum potential surface pressure in 31-01, assuming a gas gradient of 0.1 psi/ft, would be 4829 psi.
See the "Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 31-01 was measured to be 3943 psi at the datum (12.1 ppg EMW) on 5/3/2018.
The maximum downhole pressure in the 31-01 vicinity is the 3N-05 at 5456 psi at the datum or 16.7 ppg EMW.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
No specific gas zones will be drilled; gas injection has been performed in this area, so there is a chance of
encountering gas while drilling the 31-01 laterals. If significant gas is detected in the returns the contaminated
mud can be diverted to a storage tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(0))
The major expected risk of hole problems in the 31-01 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 31-01 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity
test is not required.
Page 2 of 7 June 27, 2018
PTD Application: 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-011-1-05
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm MD
MD
MD
TVDSS
TVDSS
Conductor
31-011-1
10,650
11,900
6318
6225
2V 4.7#, L-80, ST -L slotted liner;
Surface
104
1640
670
Surface
aluminum billet on to
36
J-55
BTC
Surface
4346
2%", 4.7#, L-80, ST -L slotted liner;
31-01 L1-01
9200
12,250
6281
6290
aluminum billet on to
J-55
BTC
Surface
9010
Surface
2V, 4.7#, L-80, ST -L slotted liner;
31-011-1-02
9085
11,925
6282
6212
aluminum billet on to
EUE8rd Mod
Surface
8747
Surface
6336
2W, 4.7#, L-80, ST -L slotted liner;
31-0l Ll -03
10,100
12,000
6225
6204
aluminum billet on to
2%", 4.7#1 L-80, ST -L slotted liner;
31-011-1-04
9300
12,000
6258
6232
aluminum billet on to
2%"3 4.7#, L-80, ST -L slotted liner;
31-011-1-05
8725
123050
6248
6188
deployment sleeve on to
Existing Casing/Liner Information
Category
OD
Weight
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
Surface
104
Surface
104
1640
670
Surface
9-5/8"
36
J-55
BTC
Surface
4346
Surface
3305
3520
2020
Production
7"
26
J-55
BTC
Surface
9010
Surface
6528
4980
4320
Tubing
3-1/2"
9.3
L-80
EUE8rd Mod
Surface
8747
Surface
6336
10,160
10,540
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Water based Power -Vis milling fluid (8.6 ppg)
— Drilling operations: Water based Power -Pro drilling mud (8.6 ppg). This mud weight may not
hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using
MPD practices described below.
— Completion operations: The 31-01 contains a downhole deployment valve allowing deployment of tool
strings and liner without pumping kill weight fluid. If the valve does not hold, BHA's will be deployed
using standard pressure deployments and the well will be loaded with 12.1 ppg NaBr completion fluid
in order to provide formation over -balance and maintain wellbore stability while running completions.
If higher formation pressures are encountered the completion brine will be weighted up with sodium
bromide or potassium formate.
Page 3 of 7 June 27, 2018
PTD Application: 31-01L1, 31-01L1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-01Ll-05
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5000 psi rated coiled tubing
pack off and MPD choke..BOPE equipment provides the secondary well control as detailed in section 3 "Blowout
Prevention Equipment Information".
In the 31-01 laterals we will target a constant BHP of 12.1 EMW at the window. The constant BHP target will be
adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased
reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed
for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change
in depth of circulation will be offset with back pressure adjustments.
Pressure at the 31-01 Window (8728' MD, 6322' TVD) Usinct MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 3I-01 is a Kuparuk producer equipped with 3-1/2" tubing and 7" production casing. The CTD
sidetrack will utilize laterals to target the Kuparuk sands to the west and north of the existing 3I-01
wellbore. The laterals will increase throughput and recovery from a potentially sheltered corner of a fault
block.
A recent rig workover installed tandem wedges to facilitate cutting a window with CTD. Prior to CTD
operations E -line will set an inner wedge in the tandem wedge. CDR3-AC will mill a window in the tubing
and casing using the tandem wedge like a whipstock.
Page 4 of 7 June 27, 2018
Pumps On 1.8 bpm)
Pumps Off
Formation Pressure 12.1
3978 psi
3978 psi
Mud Hydrostatic 8.6
2827 psi
2827 psi
Annular friction i.e. ECD, 0.080 sifft
698 psi
0 psi
Mud + ECD Combined
no chokepressure)
3525 psi
underbalanced -453psi)
2827 psi
underbalanced -1151psi)
Target BHP at Window 12.1
3978 psi
3978 psi
Choke Pressure Required to Maintain
Target E'
453 psi
1151 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 3I-01 is a Kuparuk producer equipped with 3-1/2" tubing and 7" production casing. The CTD
sidetrack will utilize laterals to target the Kuparuk sands to the west and north of the existing 3I-01
wellbore. The laterals will increase throughput and recovery from a potentially sheltered corner of a fault
block.
A recent rig workover installed tandem wedges to facilitate cutting a window with CTD. Prior to CTD
operations E -line will set an inner wedge in the tandem wedge. CDR3-AC will mill a window in the tubing
and casing using the tandem wedge like a whipstock.
Page 4 of 7 June 27, 2018
PTD Application: 31-011-1, 31-011-1-01, 31-011-1-02, 31-01L1-03, 31-0l Ll
Pre -CTD Work
1. RU Slickline: Pull SOV and set GLVs.
2. RU E -line: Set inner wedge.
3. Prep site for Nabors CDR3-AC.
Ria Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. 3I-0IL1 Lateral (A sand -West)
a. Mill 2.80" window at 8728' MD.
b. Drill 3" bi-center lateral to TD of 11,900' MD.
c. Run 2%" slotted liner with an aluminum billet from TD up to 10,650' MD.
3. 3I-O1L1-01 Lateral (A sand- West)
a. Kickoff of the aluminum billet at 10,650' MD.
b. Drill 3" bi-center lateral to TD of 12,250' MD.
c. Run 2%" slotted liner with aluminum billet from TD up to 9200' MD.
4. 3I-OIL1-02 Lateral (A sand -West)
a. Kick off of the aluminum billet at 9200' MD.
b. Drill 3" bi-center lateral to TD of 11,925' MD.
c. Run 2%" slotted liner with aluminum billet from TD up to 9085' MD.
5. 3I-OIL1-03 Lateral (A sand -North)
a. Kickoff of the aluminum billet at 9085' MD.
b. Drill 3" bi-center lateral to TD of 12,000' MD.
c. Run 2%" slotted liner with aluminum billet from TD up to 10,100' MD.
6. 3I-OlLl-04 Lateral (A sand -North)
a. Kickoff of the aluminum billet at 10,100' MD.
b. Drill 3" bi-center lateral to TD of 12,000' MD.
c. Run 2%" slotted liner with aluminum billet from TD up to 9300' MD.
7. 3I-0IL1-03 Lateral (A sand -West)
a. Kickoff of the aluminum billet at 9300'M0.
b. Drill 3" bi-center lateral to TD of 12,050' MD.
c. Run 2%" slotted liner with deployment sleeve from TD up to 8725' MD.
8. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC.
Post -Rig Work
1. Return to production.
and 31-01 L1-05
Page 5 of 7 June 27, 2018
PTD Application: 31-01L1, 3I-011-1-01, 31-01L1-02, 3I-011-1-03, 31-01L1-04, and 31-0l L1-05
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure, so installed in this well is a
deployment valve. This valve, when closed using hydraulic control lines from surface, isolates the well pressure
and allows long BHA's to be deployed/un-deployed without killing the well.
If the deployment valve fails, operations will continue using the standard pressure deployment process. A system
of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball
valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there
are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment
process
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
— Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
— The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
— The 31-01 well has a deployment valve installed. It will serve to deploy liners into the newly drilled laterals.
If the valve fails, the laterals will be displaced to an overbalance completion fluid (as detailed in Section
8 "Drilling Fluids Program') prior to running liner.
— While running 2%" slotted liner, a joint of 2%" non -slotted tubing will be standing by for emergency
deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a
deployment drill with this emergency joint on every slotted liner run. The 2%" rams will provide
secondary well control while running 2%" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
Page 6 of 7 June 27, 2018
PTD Application: 31-01L1, 31-011-1-01, 31-011-1-02, 31-01L1-03, 31-011-1-04, and 31-01Ll-05
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
- The Applicant is the only affected owner.
- Please see Attachment 1: Directional Plans
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. -
- MWD directional, resistivity, and gamma ray will be run over the entire open hole section
Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name
Distance ft
31-01 L1
18,980
31-01 L1-01
18,740
31-01 L1-02
18,990
31-01 L1-03
20,930
31-01 L1-04
20,815
31-01 L1-05
20,845
- Distance to Nearest Well within Pool
16. Attachments
Attachment 1:
laterals.
Lateral Name
I Distance ft
Well
31-01 L1
513
31-03
31-01 L1-01
718
31-03
31-01 L1-02
513
31-03
31-011-1-03
159
3M-04
31-011-1-04
159
3M-04
31-01Ll-05
159
3M-04
Directional Plansfor3l-01L1, 31-01L1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-01L1-05
Attachment 2: Current Well Schematic for 31-01..
Attachment 3: Proposed Well Schematic for 31-01L1, 31-01L1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-
01 L 1-05 laterals.
Page 7 of 7 June 27, 2018
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 31 Pad
31-01
31-01 L1-02
Plan: 31-01 L1-02_wp01
Standard Planning Report
19 July, 2018
BA UGHES
aGEcompany
ConocoPhillips
Database:
EDT Alaska Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kupawk River Unit
Site:
Kupamk 31 Pad
Well:
31-01
Wellbore:
31-OIL1-02
Design:
31-011-1-02_wp01
ConocoPhillips
Planning Report
Local Co�rdinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 31-01
Mean Sea Level
31-01 @ 71.00usft (31-01)
True
Minimum Curvature
Project Kuparuk River Unit North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
BArR S
a GEconi
site Kupamk 31 Pad
Site Position: Northing: 6,007,285.50 usft Latitude: 70' 25' 52059 N
From: Map Easting: 508,056.44 usft Longitude: 149' 56' 3.597 W
Position Uncertainty; 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.06 °
Well 31-01
Well Position -N/,S 0.00 usft Northing: 6,007,285.50 usft Latitude: 70" 25' 52.059 N
+E/ -W 0.00 usft Easting: 508,056.44 usft Longitude: 149.56
9° 56' 3.597 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: — _ 0.00 usft
Wellbore 31-0lLl-02
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
1°l C) InT)
BGGM2018 9/1/2018 16.95 80.93 57.444 J
Design 31-011-1-02_wp01
Audit Notes:
Version: Phase: PLAN Tie On Depth: 9,200.00
Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction
(usft) (usft) (usft) (I
0.00 0.00 0.00 300.00
711912018 12:52:47PM Page 2 COMPASS 5000.14 Build 85
Plan Sections
ConocoPhillips
BAR
ConocoPhillips
Planning Report
WHES
a GEcompaW
Database: EDT Alaska Sandbox
Local Co-ordinate Reference:
Well 31-01
Company: ConocoPhillips (Alaska) Inc. -Kup2
TVD Reference:
Mean Sea Level
Project: Kuparuk River Unit
MD Reference:
31-01 @ 71.00usft (31-01)
Site: Kuparuk 31 Pad
North Reference:
True
Well: 31-01
Survey Calculation Method:
Minimum Curvature
Wellbore: 31-01 Lt -02
-El-W
Rate
Design: 31-01 L1-02_wp01
Rate
TFO
Plan Sections
Measured
TVD Below
Dogleg
Build
Tum
Depth
Inclination
Azimuth
System
-NI-S
-El-W
Rate
Rate
Rate
TFO
(usft)
(°)
(1
(usft)
(usft)
(usft)
(-1100ft)
(-1100ft)
(°NOOft)
(°)
Target
9,200.00
90.13
304.61
6,281 .32
3,697.59
4,519.92
0.00
0.00
0.00
0.00
9,305.00
97.48
304.61
6,274.36
3,757.05
4,433.75
7.00
7.00
0.00
0.00
9,455.00
92.96
295.09
6,260.69
3,831.26
4,304.35
7.00
-3.01
-6.35
245.00
9,630.00
89.75
283.26
6,256.55
3,888.60
4,139.42
7.00
-1.83
-6.76
255.00
9,730.00
86.80
276.91
6,259.57
3,906.10
4,041.07
7.00
-2.95
-6.35
245.00
9,875.00
87.73
266.79
6,266.52
3,910.77
3,896.50
7.00
0.64
-6.98
275.00
10,100.00
89.44
251.13
6,272.12
3,867.83
3,676.43
7.00
0.76
-6.96
276.00
10,250.00
89.45
261.63
6,273.59
3,832.56
3,530.86
7.00
0.01
7.00
90.00
10,350.00
84.96
256.25
6,278.48
3,813.43
3,432.89
7.00
-4.49
-5.38
230.00
10,450.00
82.03
262.66
6,289.82
3,795.24
3,335.28
7.00
-2.92
6.40
115.00
10,550.00
88.11
266.15
6,298.41
3,785.54
3,236.18
7.00
6.07
3.50
30.00
10,725.00
90.26
254.09
6,300.91
3,755.58
3,064.13
7.00
1.23
-6.89
280.00
10,800.00
92.48
249.33
6,299.12
3,732.06
2,992.96
7.00
2.95
-6.35
295.00
10,925.00
93.96
257.97
6,292.09
3,696.95
2,873.32
7.00
1.19
6.91
80.00
11,125.00
101.86
269.65
6,264.50
3,675.44
2,676.91
7.00
3.95
5.84
55.00
11,300.00
94.69
279.69
6,239.27
3,689.65
2,504.66
7.00
-4.10
5.74
125.00
11,550.00
91.48
262.46
6,225.73
3,694.27
2,256.04
7.00
-1.28
-6.89
260.00
11,725.00
93.56
250.38
6,218.00
3,653.30
2,086.42
7.00
1.19
-6.91
280.00
11,925.00
89.87
263.89
6,211.98
3,608.92
1,892.01
7.00
-1.84
6.76
105.00
7/19/2018 12'52:47PM Page 3 COMPASS 5000.14 Build 85
ConocoPhillips BA�(ER
ConocoPhillips Planning Report ryUGHES
aGEcompany
Database:
EDT Alaska
Sandbox
Local Coordinate Reference:
Well 3141
Company:
ConocoPhillips (Alaska)
Inc. -Kup2
TVD Reference:
Mean
Sea Level
Project:
Kuparuk River Unit
MD Reference:
31-01
@ 71.00usft (31-01)
Site:
Kuparuk3l
Pad
North Reference:
True
Well:
31-01
Survey Calculation Method:
Minimum
Curvature
Wellbore:
31-O1Ll-02
Design:
31-01 Lt-02_Wp01
Planned
Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth
Inclination
Azimuth
System
+N! -S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(1)
(')
(usft)
(usft)
(usft)
(usft)
(°1100ft)
V)
(usft)
(usft)
9,200.00
- 90.13
304.61
6,281.32
3,697.59
4,519.92
-2,065.57
0.00
0.00
6,010,987.60
512,571.91
TIP/KOP
9,300.00
97.13
304.61
6,275.00
3,754.24
4,437.83
-1,966.16
7.00
0.00
6,011,044.15
512,489.77
9,305.00
97.48
304.61
6,274.36
3,757.05
4,433.75
-1,961.21
7.00
0.00
6,011,046.96
512,485.69
Start 7
dig
9,400.00
94.63
298.56
6,264.34
3,806.50
4,353.31
-1,866.83
7.00
-115.00
6,011,096.31
512,405.21
9,455.00
92.96
295.09
6,260.69
3,831.26
4,304.35
-1,812.05
7.00
-115.64
6,011,121.02
512,356.22
3
9,500.00
92.14
292.04
6,258.69
3,849.23
4,263.15
-1,767.38
7.00
-105.00
6,011,138.94
512,315.00
9,600.00
90.30
285.29
6,256.56
3,881.21
4,168.49
-1,669.41
7.00
-105.14
6,011,170.82
512,220.32
9,630.00
89.75
283.26
6,256.55
3,888.60
4,139.42
-1,640.54
7.00
-105.28
6,011,178.18
512,191.24
4
9,700.00
87.68
278.82
6,258.12
3,902.00
4,070.75
-1,574.37
7.00
-115.00
6,011,191.51
512,122.57
9,730.00
86.80
276.91
6,259.57
3,906.10
4,041.07
-1,546.62
7.00
-114.90
6,011,195.57
512,092.89
6
9,800.00
87.23
272.02
6,263.22
3,911.55
3,971.40
-1,483.56
7.00
-85.00
6,011,200.94
512,023.22
9,875.00
87.73
266.79
6,266.52
3,910.77
3,896.50
-1,419.08
7.00
-84.75
6,011,200.09
511,948.33
6
9,900.00
87.91
265.05
6,267.47
3,909.00
3,871.58
-1,398.39
7.00
-84.00
6,011,198.28
511,923.41
10,000.00
88.66
258.09
6,270.46
3,894.35
3,772.77
-1,320.14
7.00
43.93
6,011,183.53
511,824.63
10,100.00
89.44
251.13
6,272.12
3,867.83
3,676.43
-1,249.97
7.00
-83.73
6,011,156.91
511,728.32
7
10,200.00
89.44
258.13
6,273.11
3,841.35
3,580.07
-1,179.76
7.00
90.00
6,011,130.32
511,632.00
10,250.00
89.45
261.63
6,273.59
3,832.56
3,530.86
-1,141.53
7.00
89.93
6,011,121.49
511,582.81
6
10,300.00
87.20
258.95
6,275.06
3,824.13
3,481.60
-1,103.09
7.00
-130.00
6,011 , 113.01
511,533.56
10,350.00
84.96
256.25
6,278.48
3,813.43
3,432.89
-1,066.26
7.00
-129.92
6,011,102.25
511,484.87
9
10,400.00
83.48
259.45
6,283.52
3,802.96
3,384.27
-1,029.38
7.00
115.00
6,011,091.73
511,436.26
10,450.00
82.03
262.66
6,289.82
3,795.24
3,335.28
-990.82
7.00
114.68
6,011,083.96
511,387.29
10
10,500.00
85.07
264.41
6,295.43
3,789.65
3,285.92
-950.87
7.00
30.00
6,011,078.31
511,337.94
10,550.00
88.11
266.15
6,298.41
3,785.54
3,236.18
-909.85
7.00
29.80
6,011,074.16
511,288.21
11
10,600.00
88.72
262.70
6,299.80
3,780.69
3,186.45
-869.20
7.00
-80.00
6,011,069.25
511,238.48
10,700.00
89.95
255.81
6,300.96
3,762.07
3,088.27
-793.48
7.00
-79.90
6,011,050.52
511,140.33
10,725.00
90.26
254.09
6,300.91
3,755.58
3,064.13
-775.82
7.00
-79.82
6,011,044.01
511,116.20
12
10,800.00
92.48
249.33
6,299.12
3,732.06
2,992.96
-725.95
7.00
-65.00
6,011,020.41
511,045.07
13
10,900.00
93.67
256.24
6,293.75
3,702.51
2,897.64
-658.17
7.00
80.00
6,010,990.77
510,949.79
10,925.00
93.96
257.97
6,292.09
3,696.95
2,873.32
-639.90
7.00
80.37
6,010,985.18
510,925.48
14
11,000.00
96.96
262.30
6,284.95
3,684.15
2,799.80
-582.62
7.00
55.00
6,010,972.30
510,851.98
11,100.00
100.89
268.16
6,269.43
3,675.91
2,701.42
-501.54
7.00
55.41
6,010,963.96
510,753.62
11,125.00
101.86
269.65
6,264.50
3,675.44
2,676.91
480.55
7.00
56.32
6,010,963.46
510,729.11
16
11,200.00
98.81
274.00
6,251.03
3,677.80
2,603.19
415.53
7.00
125.00
6,010,965.74
510,655.40
11,300.00
94.69
279.69
6,239.27
3,689.65
2,504.66
-324.27
7.00
125.78
6,010,977.49
510,556.87
16
11,400.00
93.44
272.79
6,232.18
3,700.48
2,405.57
-233.04
7.00
-100.00
6,010,988.21
510,457.77
71192018 12:52:47PM Page 4 COMPASS 5000.14 Build 85
ConocoPhillips BA ER
ConocoPhillip5 Planning Report I IGHES
BAT
GEcmn,,
Database:
EDT Alaska Sandbox
Local Co-ordinate Reference:
Well 31-01
Company:
ConocoPhillips (Alaska)
Inc. -Kup2
TVD Reference:
Mean
Sea Level
Project:
Kupawk River Unit
MD Reference:
31-01 @ 71.00usft (31-01)
Site:
Kupawk 31 Pad
North Reference:
True
Well:
31-01
Survey Calculation
Method:
Minimum Curvature
Wellbore:
31-011-1-02
Design:
31-011-1-02_Wp01
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination Azimuth
System
+N/ -S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(_) (o)
(usft)
(usft(
(usft)
(usft)
(-1100ft)
V)
(usft)
(usft)
11.550.00
9148 262.46
6,225.73
3,694.27
2,256.04
-106.66
7.00
-100.83
6010,981.83
510,308.27
17
11,600.00
92.09 259.01
6,224.17
3,686.22
2,206.73
-67.97
7.00
-80.00
6,010,973.73
510,258.97
11,700.00
93.27 252.10
6,219.49
3,661.33
2,110.05
3.30
7.00
-80.11
6,010,948.74
510,162.33
11,725.00
93.56 250.38
6,218.00
3,653.30
2,086+42
19.75
7.00
-80.43
6,010,940.69
510,138.71
18
11,800.00
92.19 255.45
6,214.24
3,631.30
2,014.85
70.74
7.00
105.00
6,010,918.61
510,067.17
11,900.00
90.34 262.20
6,212.03
3,611.94
1,916.83
145.95
7.00
105.25
6,010,899.15
509,969.18
11,925.00 •
89.87 263.89
6,211.98 -
3,608.92
1,892.01
165.92
7.00
105.40
6,010,896.10
509,944.37
Planned
TD at 11925.00
7/19/2018 12:52:47PM Page 5 COMPASS 5000.14 Build 85
ConocoPhillips BA_ j(ER
ConocoPhillips Planning Report HUGHES
aGEcompany
Database:
EDT Alaska Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kupamk River Unit
Site:
Kuparuk 31 Pad
Well:
31-01
Wellbore:
31-0111-02
Design:
31-0111-02_W p01
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 31-01
Mean Sea Level
31-01 @ 71.00usft (31-01)
Time
Minimum Curvature
Targets
Target Name
-hit/miss target Dip Angle Dip Dir. TVD -N/-S +E/ -W Northing Easting
-Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude
31 -01L1 -02T03 0.00 0.00 6,266.00 2,431.371,144,047.17 6,010,952.00
1,651,986.00 70'11'59.091N 140'41'1.927 W,
- plan misses target center by 1139527.96usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
6,010,868.00
- Point
- plan misses target center by 1139522.27usft at
31-011-1_Fault4 0.00 0.00 6,306.00 2,170.491,142,991.78 6,010,690.00
1,650,931.00 70° 11'58,128 N 140'41'33.291 W
- plan misses target center by 1138472.89usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
Point 6,248.00 0.00 0.00 6,011,187.00
- Polygon
Point 6,306.00 0.00 0.00 6,010,690.00
1,650,931.00
Point 2 6,306.00 1.00 1.00 6,010,691.00
1,650,932.00
31-011-1_Fault2_M 0.00 0.00
0.00
2,347.391,144,024.08
6,010,868.00
1,651,963.00 70° 11'58.310 N 140'41'2.957 W
- plan misses target center by 1139522.27usft at
9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Polygon
- Rectangle (sides W1.00 1-17,000.00 D0.00)
Point 6,248.00 0.00 0.00 6,011,187.00
1,652,464.00
Point 6,246.00 1.00 1.00 6,011,188.00
31-01 CTD Polygon Nortl 0.00 0.00
0.00
1,925.811,144,520.67
6,010,447.00
1,652,460.00 70' 11'53.479 N 140° 40'50.588 W
- plan misses target center by 1140019.44usft at
9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
0.00
-Polygon
281.16
6,010,405.01
1,652,842.00
Point
Point 1
0.00
0.00 0.00
6,010,447.00
1,652,460.00
Point
0.00
934.28 -183.06
6,011,380.99
1,652,275.95
Point
0.00
1,493.14 8.54
6,011,940.00
1,652,466.93
Point
0.00
3,219.29 34.31
6,013,666.00
1,652,490.83
Point
0.00
3,030.77 517.17
6,013,478.02
1,652,973.85
Point
0.00
1,541.74 407.63
6,011,989.03
1,652,865.92
Point
0.00
759.88 195.80
6,011,207.02
1,652,654.96
Point
0.00
96.56 438.14
6,010,544.02
1,652,897.99
Point
0.00
-181.13 107.82
6,010,266.00
1,652,568.00
Point 10
0.00
0.00 0.00
6,010,447.00
1,652,460.00
31-01 CTD Polygon Nortl
0.00 0.00 0.00
1,758.681,144,621.50
6,010,280.00
1,652,561.00 70' 11'51.707 N 140° 40'48.435 W
- plan misses target center by 1140120.54usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
-Polygon
- Polygon
Point 6,248.00 0.00 0.00 6,011,187.00
1,652,464.00
Point 6,246.00 1.00 1.00 6,011,188.00
Point 1
0.00
0.00
0.00
6,010,280.00
1,652,561.00
Point
0.00
124.72
281.16
6,010,405.01
1,652,842.00
Point
0.00
451.71
326.50
6,010,732.02
1,652,886.98
Point
0.00
799.27
-180.20
6,011,079.00
1,652,379.96
Point
0.00
595.76
-1,655.55
6,010,873.91
1,650,904.97
Point
0.00
1,672.96
-2,710.55
6,011,949.86
1,649,848.92
Point
0.00
1,106.98
-2,787.14
6,011,383.86
1,649,772.94
Point
0.00
224.03
-1,954.97
6,010,501.90
1,650,605.98
Point
0.00
417.38
-329.60
6,010,696.98
1,652,230.98
Point 10
0.00
295.07
-34.70
6,010,575.00
1,652,525.98
Point 11
0.00
0.00
0.00
6,010,280.00
1,652,561.00
31-01-1-03_Fault5 0.00 0.00 6,246.00 2,665.881,144,525.47 6,011,187.00
1,652,464.00
70' 12' 0.656 N 140' 40'47.202 W
- plan misses target center by 1140006.02usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
-Polygon
Point 6,248.00 0.00 0.00 6,011,187.00
1,652,464.00
Point 6,246.00 1.00 1.00 6,011,188.00
1,652,465.00
31-011-1-01 0.00 0.00 6,257.00 2,406.101,144,294.17 6,010,927.00
1,652,233.00
70' 11'58.478 N 140' 40'54.966 W
- plan misses target center by 1139774.98usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
31-0111-02T05 0.00 0.00 6,289.00 2,315.961,143,487.99 6,010,836.00
1,651,427.00
70' 11'58.802 N 140' 41' 18.445 W
- plan misses target center by 1138968.91 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
31-011-7-03_Fault5M 0.00 0.00 0.00 2,665.881,144,525.47 6,011,187.00
1,652,464.00
70' 12'0.656 N 140' 40'47.202 W
- plan misses target center by 1140023.33usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Rectangle (sides W1.00 H1,000.00 D0.00)
7/192018 12:52:47PM Page 6 COMPASS 5000.14 Build 85
ConocoPhillips BATH
ConocoPhillips Planning Report I jUGI ES
aGEcompany
Database:
EDT Alaska Sandbox
Local Co-ordinate Reference:
Company:
ConocoPhilllps(Alaska) Inc.-Kup2
TVD Reference:
Project:
Kuparuk River Unit
MD Reference:
Site:
Kuparuk 31 Pad
North Reference:
Well:
31-01
Survey Calculation Method:
Wellbore:
31-OILl-02
N, 4519.92 E)
Design:
31-01 1-1-02_wp01
- Point
-plan misses target center by 1139083.92usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
31-01 L1_Fault3_M 0.00 0.00
0.00
2,283.991,143,457.95
6,010,804.00
- plan misses target center by 1138956.23usft at
9200.00usft MD (6281.32 TVD, 3697.59
N. 4519.92 E)
- Rectangle (sides W1.00 1-11,000.00 D0.00)
Point 6,299.00 1.00 1.00 6,010,805.00
1,651,398.00
31-01 1 1-02_T01 0.00 0.00 6,265.00 2,322.871,144,505.10 6,010,844.00
31-01 CTD Polygon Wes 0.00 0.00
0.00
1,758.681,144,621.50
6,010,280.00
- plan misses target center by 1140120.54usft at
9200.00usft MD (6281.32 TVD, 3697.59
N, 4519.92 E)
- Polygon
- Point
Point 1
0.00
0.00 0.00
6,010,280.00
Point
0.00
124.72 281.16
6,010,405.01
Point 3
0.00
451.71 326.50
6,010,732.02
Point
0.00
799.27 -180.20
6,011,079.00
Points
0.00
523.82 -2,687.73
6,010,800.87
Point
0.00
138.79 -2,702.13
6,010,415.86
Point
0.00
417.37 -319.60
6,010,696.98
Pointe
0.00
299.07 -34.70
6,010,579.00
Point
0.00
0.00 0.00
6,010,280.00
Well 31-01
Mean Sea Level
31-01 @ 71.00usft (31-01)
True
Minimum Curvature
1,651,397.00
1,652,561.00
1,652,561.00
1,652,842.00
1,652,886.98
1,652,379.96
1,649,872.97
1,649,858.99
1,652,240.98
1,652,525.98
1,652,561.00
70° 11'58.537 N 140'41'19.445 W
70° 11'51.707 N 140° 40'48.435 W
31-01L1_Fault3 0.00 0.00 6,299.00 2,283.991,143,457.95 6,010,804.00
1,651,397.00 70° 11'58.537 N 140° 41' 19.445
- plan misses target center by 1138938.91 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Polygon
Point 6,299.00 0.00 0.00 6,010,804.00
1,651,397.00
Point 6,299.00 1.00 1.00 6,010,805.00
1,651,398.00
31-01 1 1-02_T01 0.00 0.00 6,265.00 2,322.871,144,505.10 6,010,844.00
1,652,444.00 70° 11' 57.357 N 140° 40'49.291
- plan misses target center by 1139986.01 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
1,651,963.00
- Paint
1,651,964.00
31-0l Ll -02 TOS 0.00 0.00 6,264.00 2,195.671,142,818.79 6,010,715.00
1,650,758.00 70° 11' 58.629 N 140° 41'38.134 W
- plan misses target center by 1138299.87usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
31-01 L1_Fault2 0.00 0.00 6,288.00 2,347.391,144,024.08 6,010,868.00
1,651,963.00 70°11'58.310N 140"41'2.957W
- plan misses target center by 1139504.96usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Polygon
Point 6,288.00 0.00 0.00 6,010,868.00
1,651,963.00
Point 6,288.00 1.00 1.00 6,010,869.00
1,651,964.00
31-01 1-1-02T09 0.00 0.00 6,212.00 2,129.511,142,036.64 6,010,648.00
1,649,976.00 70°11'59.149N 140°42'0.820W
- plan misses target center by 1137517.81 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
31-011-1-02 T06 0.00 0.00 6,301.00 2,278.251,143,219.92 6,010,798.00
1,651,159.00 70° 11'58.835 N 140' 41'26.286 W
- plan misses target center by 1138700.89usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
31-OtLt_Fauft4_M 0.00 0.00 0.00 2,170.491,142,991.78 6,010,690.00
1,650,931.00 70'11'58.128N 140°41'33.291W
- plan misses target center by 1138490.22usft at 9200.00usft MD (6281.32 TVD, 3697.59 N. 4519.92 E)
- Rectangle (sides W1.00 1-11,000.00 DO.00)
31-0lLl-02_T07 0.00 0.00 6,292.00 2,217.461,143,018.84 6,010,737.00
1,650,958.00 70° 11'58.544 N 140° 41'32.310 W
- plan misses target center by 1138499.88usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E)
- Point
Casing Points
Measured Vertical
Casing Hole
Depth Depth
Diameter Diameter
(usft) (usft) Name
(in) (in)
11,925.00 6,211.98 23/8"
2375 3.000
711912018 12: 52: 47PM Page 7
COMPASS 5000.14 Build 85
ConocoPhillips BATER
ConocoPhillips Planning Report HUGHES
aGEcompany
Database:
EDT Alaska Sandbox
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kuparuk River Unit
Site:
Kupamk 31 Pad
Well:
31-01
Wellbore:
31-01 Lt -02
Design:
31-01 L1-02_wp01
Plan Annotations
Measured
Vertical
Depth
Depth
(usft)
(usft)
9,200.00
6,281.32
9,305.00
6,274.36
9,455.00
6,260.69
9,630.00
6,256.55
9,730.00
6,259.57
9,875.00
6,266.52
10,100.00
6,272.12
10,250.00
6,273.59
10,350.00
6,278.48
10,450.00
6,289.82
10,550.00
6,298.41
10,725.00
6,300.91
10,800.00
6,299.12
10,925.00
6,292.09
11,125.00
6,264.50
11,300.00
6,239.27
11,550.00
6,225.73
11,725.00
6,218.00
11,925.00
6,211.98
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Local Coordinates
+NIS
+E/ -W
(usft)
(usft)
3,697.59
4,519.92
3,757.05
4,433.75
3,831.26
4,304.35
3,888.60
4,139.42
3,906.10
4,041.07
3,910.77
3,896.50
3,867.83
3,676.43
3,832.56
3,530.86
3,813.43
3,432.89
3,795.24
3,335.28
3,785.54
3,236.18
3,755.58
3,064.13
3,732.06
2,992.96
3,696.95
2,873.32
3,675.44
2,676.91
3,689.65
2,504.66
3,694.27
2,256.04
3,653.30
2,086.42
3,608.92
1,892.01
Comment
TIP/KOP
Stan 7 cls
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Planned TD at 11925.00
Well 31-01
Mean Sea Level
31-01 Q 71.00usft (31-01)
True
Minimum Curvature
711912018 12 52 47PM Page 8 COMPASS 5000 14 Build 85
Baker HugheslNTEQ
ConocoPhillips Travelling Cylinder ReportI BIKER a GErompeRy
Company:
ConocoPhillips(Alaska) Inc.-Kup2
Project:
Kuparuk River Unit
Reference Site:
Kupawk 31 Pad
Site Error:
0.00 usft
Reference Well:
31-01
Well Error:
0.00 usft
Reference Wellbore
31-01 L1-02
Reference Design:
31-0111-02_wp01
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 31-01
31-01 Q 71.00usft (31-01)
31-01 @ 71.00usft (31-01)
True
Minimum Curvature
1.00 sigma
OAKEDMP2
Offset Datum
ieference
31-01Ll-02_wp01
Depth
altar type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
To
interpolation Method:
MD Interval 25.00usft Error Model:
ISCWSA
3epth Range:
9,200.00 to 11,925.00usft Scan Method:
Tray. Cylinder North
iesults Limited by:
Maximum center -center distance of 1,385.40 usft Error Surface:
Pedal Curve
Survey Tool Program
Date 7/18/2018
Depth
Depth
From
To
11,925.00
6,282.98 23/8"
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
100.00
8,700.0031-01(31-01)
GCT -MS
Schlumberger GCT multishot
8,700.00
9,200.00 31-01 L7_wp02(31-01 Li)
MWD
MWD -Standard
9,200.00
11,925.00 31-011-1-02_wp01 (31-011-1-02)
MWD
MWD - Standard
Casing Points
Measured
Vertical
Depth
Depth
(usft)
(usft)
11,925.00
6,282.98 23/8"
Name
Casing Hole
Diameter Diameter
2-3/S 3
Summary
Kupamk 31 Pad -31-01-31-01-31-01
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation
Warning
Site Name
Depth
Depth
Distance
(usft)
from Plan
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
Measured
(usft)
Reference
Kuparuk 31 Pad
T..Koae
enter Wellbore
Centre
Casing-
Centre to
No Go
31-01 - 31-01 - 31-01
9,212.66
8,475.00
449.56
11.47
443.71
Pass - Major Risk
31-01-31-011-1-31-01 Ll_wp02
10,459.68
10,425.00
29.26
1.33
29.03
Pass - Minor 1/10
31-01-31-01 L1-01-31-011-1-01_wp02
10,934.02
10,900.00
16.77
1.37
15.50
Pass - Minor 1/10
31-01-31-01 L1-03-31-01 L1-03_wp02
9,399.52
9,450.00
150.13
1.36
149.22
Pass - Minor 1110
31-01-31-011-1-04-31-01 Li-04_wp01
9,399.52
9,450.00
150.13
1.36
149.22
Pass - Minor 1/10
31-01-31-011-1-05-31-01 L1-05_wp01
9,400.77
9,450.00
149.40
1.31
148.53
Pass - Minor 1/10
31-02 - 31-02 - 31-02
6.115.74
0.44
0.00
-115.11
3,376.69
Out of range
31-04 - 31-04 - 31-04
468.34
11.53
462.29 Pail -Major Risk
9.249.15
6.350.74
Out of range
31-08 - 31-08 - 31-08
0.45
0.00
-113.95
3.374.31
4255.37
Out of range
Offset Design
Kupamk 31 Pad -31-01-31-01-31-01
olsat site Error. 000 use
survey Program: t0SrGCT-MS
Rule AssMmd: Major Risk
Wine Well Error. 0.00 usft
Referenoe
clear
Semi Major Axis
Measured
vertical
Measured
Vertical
Reference
meet
T..Koae
enter Wellbore
Centre
Casing-
Centre to
No Go
Allowable Warning
Milk
capN
Meet
nepth
Avmuth
+Nk
e�-W
Hob Size
Cars.
eietanu
Devlauon
(..it)
(usn)
(usm
Weak)
tush
(usft)
(°I
tum)
tualt
1"1
(usnl
Iuste
luau
9.21266
6.352.20
8,475.00
6.134.42
0,43
0.00
-116.41
3.378.91
4,289.30
3
449.56
11.47
443,71 Pa.- Major Risk. CO, ES. SF
9,230.40
6.351.69
8,450.00
6.115.74
0.44
0.00
-115.11
3,376.69
4,272.04
3
468.34
11.53
462.29 Pail -Major Risk
9.249.15
6.350.74
8.425.00
8.097.08
0.45
0.00
-113.95
3.374.31
4255.37
3
137.29
11.59
481.03 Pass - Major Risk
9.288.90
6,349.26
8,400.00
6.078.43
GAS
0.00
-112.92
3.371.78
4,239.91
3
508.35
11.65
499.87 Pass - Major Risk
9.289.93
8,367.19
8,375.00
6,059.60
0.47
0.00
-112.00
3,369.05
4,223.47
3
525.51
11.71
510.79 Pass - Major Risk
9,311.70
8.344.50
4350.00
8,04118
0.49
0.00
-111.67
3.366.12
6,207.07
3
544]2
11.62
537.76 Pass - Major Risk
9.333.12
6.341.91
8.325.00
6.022.53
0.51
0.00
-112.43
3,362.97
4.190.70
3
sees
12.02
555.7a Pass - Major Risk
9.35,1.56
6,339.51
6.300.00
6.003.90
0.52
0.00
-113.20
3,359.61
4,174.38
3
593.30
12.22
575.85 Pass - Major RU
9,376.07
6.337.42
8.275.00
5.985.31
0.54
0.00
-113.99
3.356.00
4,158.05
3
602.68
12.42
591 Pass - Major Risk
9,397.61
8.335.53
8.250.40
5,988.83
0.58
0,00
-114.80
3.352.09
1,141.88
3
622.15
12.66
61423 Pass - Major Risk
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
71182018 3:12:29PM Page 2 COMPASS 5000.14 Build 85
ConocoPhillips
Profact Kupamk Rlver Unit
Site: Kupamk 31 Pad
alm�al.mn,�. xonn
wrmnc Nonn less•
ue9muc nele
WELLBORE DETAILS' 31-OILl-02
REFERENCE INFORIATION
Parent Wellbore. 31A1L1
�ORQInaa(M) Relamme. Wd3bI.T.NOM
Wall: 31.01
sn.,am. nwaaN
Tie On MD: 9200.00
Ve lIND)Rae. wen see L"
Wellbore: 11-011.1-02
aG!ik'. 8191'
14
Easting
Reknnm:
Man: 31-011.1-02 wpOt (31-01/31.01L1A2)
ume Wooman
0.00 0.00
314,@.Wµ p
wuurol Oepn Releienm: 31L1Ritaoum pial)
aw b
6007285.50
508056.44
70" 25'52.059 N 149°
cewbxm eeaoa: woman ax.va
Mean'
690C
660C
630C
6000
570[
C
a s4o[
o5 OC
0
-4 OC
=45a
0
42a
O390f
360[
330f
30 0(
270(
IBAn ER
LMES
1 aGE�
WELL
DETAILS:
31-01
+N/ -S +E/ -W
Northing
Easting
Latitude
Longitude
0.00 0.00
1■■■■■�►
6007285.50
508056.44
70" 25'52.059 N 149°
56'3.597 W
Sec
MD
Inc
Azi
TVDSS
+N/ -S
+E/ -W
Dleg
TFace
VSect
■■■■■■■■■■�11
Annotation
1
9200.00
90.13
304.61
6281.32
3697.59
4519.92
0.00
0.00
-2065.57
TIPIKOP
2
9305.00
97.48
304.61
6274.36
3757.05
4433.75
7.00
0.00
-1961.21
Start 7 dis
3
9455.00
92.96
295.09
6260.69
3831.26
4304.35
7.00
245.00
-1812.05
3
4
9630.00
89.75
283.26
6256.55
3888.60
4139.42
7.00
255.00
-1640.54
4
5
9730.00
86.80
276.91
6259.57
3906.10
4041.07
7.00
245.00
-1546.62
5
6
9875.00
87.73
266.79
6266.52
3910.77
3896.50
7.00
275.00
-1419.08
ENSHRINES-
6
710100.00
89.44
251.13
6272.12
3867.83
3676.43
7.00
276.00
-1249.97
7
810250.00
1■■..I..■I.■■�■■■�.®■�11,
89.45
261.63
6273.59
3632.56
3530.86
7.00
90.00
A141.53
_0�rt►'LEON
8
910350.00
84.96
256.25
6278.48
3813.43
3432.89
7.00
230.00
A066.26
9
1010450.00
82.03
262.66
6289.82
3795.24
3335.28
7.00
115.00
-990.82
10
11
10550.00
88.11
266.15
6298.41
3785.54
3236.18
7.00
30.00
-909.85
11
1210725.00
90.26
254.09
6300.91
3755.58
3064.13
7.00
280A0
-775.82
12
1310800.00
92.48
249.33
6299.12
3732.06
2992.96
7.00
295.00
-725.95
13
1410925.00
93.96
257.97
6292.09
3696.95
2873.32
7.00
80.00
-639.90
14
15
11125.00
101.86
269.65
6264.50
3675.44
2676.91
7.00
55.00
480.55
15
1611300.00
94.69
279.69
6239.27
3689.65
2504.66
7.00
125.00
-324.27
16
1711550.00
91.48
262.46
6225.73
3694.27
2256.04
7.00
260.00
-106.66
17
18
11725.00
93.56
250.38
6218.00
3653.30
2086.42
7.00
280.00
19.75
18
19
11925.00
89.87
263.89
6211.98
3608.92
1892.01
7.00
105.00
165.92
Planned TD at 11925.00
Mean'
690C
660C
630C
6000
570[
C
a s4o[
o5 OC
0
-4 OC
=45a
0
42a
O390f
360[
330f
30 0(
270(
IBAn ER
LMES
1 aGE�
West( -)/East(+) (300 usft/in)
iii
1■■■■■�►
■I■■■ ■■■�1�■■.11.A■■.■■■.■■..■■■
■
■■■■■■■■■■�11
M 14
�■■.■
'i■■■■■■■■■■■■ill'i
...■
■.■.■�
NONE
a ����®,1'll'I..■.■
F11i..■■
■I - ■■■■��■■■�1■
NINON
_ ■■�■■■■■.■■■■
■
■■■■mono■m
■■■nl■■■■■■
■■■■1■■.
i■■
...■�.�.1.�.•............
.■■■.
ENSHRINES-
■■llgiVA■■■■■
1■■..I..■I.■■�■■■�.®■�11,
MEMO
Ili..
a■■�__
��■��®
_0�rt►'LEON
■
I
�dl�.■��J�iME■■
,�■■■■..■■�■■■
IN
West( -)/East(+) (300 usft/in)
Vertical Section at 300.00° (85 usft/in)
iii
1■■■■■�►
■I■■■ ■■■�1�■■.11.A■■.■■■.■■..■■■
NONE
■I - ■■■■��■■■�1■
NINON
_ ■■�■■■■■.■■■■
mom
...■�.�.1.�.•............
1■■..I..■I.■■�■■■�.®■�11,
■
,�■■■■..■■�■■■
IN
r�
��aa�Naaaaae�al�aaaaaaalaaaa�
1
1
-1�®_/���_�_®-®
1■��i���l��.■..��11��ii®■(i1.®■Ii.■■■■■.■■
1s
■lii�■■I■■■■■..■1�■f11i11■■■■■■■■■■.■■■.■■�
Vertical Section at 300.00° (85 usft/in)
31-01 RWO Final Schematic
16" 62# H-40
shoe @ 104' MD
9-5/8" 36# J-55 shoe
@ 4346' MD
A2 -sand perfs
18734'- 8760' MD
1 -sand perfs
F8;70'- 8798' MD
7" 26# J-55 shoe @ 9010' MD
Updated: 19 -Jul -2018 RLP
3-1/2" Camco MMG gas lift mandrels @ 3130' RKB
Baker Orbit Valve @ 3597' RKB
3-1/2" 9.3# L-80 ELIE 8rd Tubing to surface
3-1/2" Camco MMG gas lift mandrels @ 4930, 6251',
7272', 8003' & 8465' RKB
Baker Locator @ 8518' RKB
Baker PBR 80-40 @ 8522' RKB (2.99" ID)
Baker FHL Packer @ 8535' RKB (2.91" ID)
3-Y2" X landing nipple at 8588' RKB (2.813" min ID)
Northern Solutions WEDGE (see details)
Top of Wedge Assembly @ 8698' RKB
3-%" X landing nipple at 8712' RKB (2.813" min ID)
Top of Wedge Assembly @ 8728' RKB
3-'/" X landing nipple at 8742' RKB (2.813" min ID)
Baker WLEG @ 8747' RKB
Northern Solutions Wedge
* 3-1/2" 9.3# L-80 Base Pipe
* 550' Tp at l Length long)
* 0.625" Bore thru tipper Tray
* 1.126" Bore thru Lower Ssotion
* HES 2.81" X Nippla below
31-01 Proposed CTD Schematic
@104'MD
9-518" 36# J-55 shoe
@ 4346' MD
8LI KOP @ 8698' MD
113roposed KOP @ 8728' MD I
2 sand parts
8734'-8760' MD
KI and pelts
8770' - 8798' MD
7" 26# J-55 shoe a 901V MD
3-1/2" Camco MMG gas lift mandrels @ 3129' RKB
Baker Orbit Valve @ 3596' MD
3-1/2" 9.3# L-80 ELE 8rd Tubing to surface
3-1/2" Camco MMG gas lift mandrels @ 4929', 6250',
7271',8002'. 8 8464'
Baker Locator @ 8517' RKB
Baker PBR 8040 @ 8522' MD (3" ID)
Baker FHL Packer @ 8535' MD (4" ID)
VW' X landing nipple at 8588' MD (2.813" min ID)
Northern Solutions WEDGE (see details)
Top of Wedge Assembly @ 8698' IRKS
3-K" X landing nipple at 8712' MD (2.813" min ID)
Top of Wedge Assembly @ 8728' RKB
3-'h" X landing nipple at 8741' MD (2.813" min ID)
Baker WLEG @ 8747' MD
Northern Solutions Wedge
5.905" OD (12.9- longe)Pipe
-'40' Total Len 91h
0.625' Bore tlsu Lipper Tray.
• 1.125" Bore tteu Lower Section
` HES 2.81" X t4ple below
Updated: 18Jul-2018 WRL
IIWILI-05 wool
To @ 12,050' Mo
Top of 12ner @ 8,M' MO
TO @ 12,000' MD
M M@9.300'MO
31-011.1-03 wp02
TD @ 12,000' MD
Beet @ 10,100' MD
I 31-01L1A2 wpol
TO @ 11,925' MD
9""@ 9,085' MD
31411L1-0Iw0o2
TO @ ]@ 9,20
Billet @ 9,200'0' M MD
3f 111.w,,01
TO @ 11,900' MD
Billet @ 10,650' MO
TRANSMITTAL LETTER CHECKLIST
WELL NAME: /eA& 3.1-- C� Z /_ I — n Z
PTD:
✓ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: L 6, V 14 Z,-' L°c Y POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment existing ell Permit
LATERAL
�of
No. [ �� 1� API No. 50-"2- S/ 6�'- 64:D
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-
_) from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
sam les are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Com any Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testiLig program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERU
PTD#:2180890
1
1
2
10
Appr Date 11
SFD 7/24/2018 12
13
14
15
16
Engineering
Appr Date
VTL 8/28/2018
18
19
00 Well Name: KUPARUK RIV UNIT 31-01L1-0 Program DEV Well bore seg 0
Initial Class/Type DEV / PEND GeoArea 690 Unit 11160 On/Off Shore O A --
rvonconven, gas conforms to AS31,05,030Q.1.A),(j,2.A-D) _ _ _ .. _ _ _
NA
n nnular Disp
Permittee attached...
NA
Lease number appropriate_ _
Yes
_
_ Entire well within ADL0025521
Unique well name and number _ _ _ _ _ _ _ _
Yes
37
Well located in defined pool _ _ _ _ _ _ _ _ _ _ _ _ _
_ Yes _
_ KUPARUK RIVER,. KUPARUK RIV OIL -490100
Well located proper distance from drilling unit boundary .. _ _
Yes
Kuparuk River Oil Pool, governed by Conservation Order No. 432D
Well located proper distance from other wells.. _ _ _ _ ... _ _
Sufficient acreage available in drilling unit.
Yes _
Conservation Order No. 432D has no interwell. spacing restrictions. Wellbore will be more than 500'
_ _ _ _ _ _
If deviated, is wellbore plat. included
Yes
from an external property line Where_ ownership or landownership changes. As proposed, well will _
_ _ .. _ _
Yes ...
_ conform to spacing. requirements.
Operator only affected party _ _ _ _ _ ....
Yes
Operator has. appropriate bond in force _ _ _ _ _ . _
Yes
Engineering Public
Date: Commissioner: Date Commissioner
Permit can be issued without conservation order .. _
Yes
_
Permit can be issued without administrative approval _ _ _ _ _ _
Yes
Can permit be approved before 15 -day waif _ _ _ _ _ _
Yes
Well located within area and strata authorized by Injection Order# (put. 10# in. comments) (For;
NA
.... _
All Wells within 1/4 mile areaof review identified (For service well only) _ _ _ . _ _
NA
Pre -produced injector: duration of pre production less than 3 months (For service well. only) _
_ .NA ...
_
Conductor string. provided _ _ _ _ _ _ _ . _ _ _ _
NA
Conductor set in KRU 31-01
Surface casing protects all known U$DWs _
NA
_ Surface casing set in KRU 31701
CMT vol adequate to circulate. on conductor & surf csg
_ NA
Surface casing set and fully cemented
CMT vol adequate to tie-in long string to. surf osg.. _ _
NA
CMT will cover all known_ productive horizons _
No
Productive. interval will be completed with uncemented slotted liner
Casing designs adequate for C, T, B &_ permafrost.
Yes
Adequate tankage or reserve pit _
Yes
Rig has steel tanks; all wastet0 approved disposal wells
If.are-drill, has . a 10403 for abandonment been approved _
NA
Adequate wellbore separation proposed_
Yes
Anti_ -collision analysis complete; no major risk failures
If diverter required, does it meet regulations _ _ _
NA
_
Drilling fluid program schematic & equip list adequate _ _ _ _ _ _ _
BOPEs,.do they meet regulation
Yes
Max formation pressure is 5456 psig(1(i.7 ppg. EMW); will drill w/ 8,6. ppg EMW and maintain ove_rb_al w/ MPD
_ _ _ _ _ _ _ _ _
Yes.
BOPE.press rating appropriate: test to (put psig in comments)... _ _
Yes
MPSP is 4829 psig; will test BOPs to 4900 psig
Choke. manifold complies w/API. RP -53 (May 84) _ _ _
Yes
_
Work will occur without operation shutdown_ _ _ _ _ _
Yes
Is presence. of H2S gas probable _ _ _ _ _
Yes
H2S measures required
Mechanical.opni ition of wells within AOR verified (For service well only) _ . _ _
NA
_
Geology
3o
Permit can be issued w/o hydrogen sulfide measures
No
31 -Pad wells are H2S-bearing. H2S measures are. required.
36
Data. presented on potential overpressure zones _ _ _
_ _ Yes
Expected reservoir pressure is -12.1 ppg EMW, with a maximum up to 716.7 ppg_EMW.
Appr Date
37
Seismic analysis of shallow gas zones_ _
_ NA
Well will be drilled using 8,6 ppg mud,. a coiled -tubing rig, and managed_ pressure drilling.
SFD 7/24/2018
38
Seabed condition survey (if off -shore) _
.NA _ _ _
_ technique to. control formation pressures and stabilize shale sections. NOTE: Chance
39
Contact name/phone for weekly progress reports [exploratory only] _
_ _ NA _ .. _
of
encountering gas while drilling this wellbore due.to gas injection performed in this area.
Geologic
Commissioner:
Engineering Public
Date: Commissioner: Date Commissioner
Date
Pr
/3o la 4-1�4, �h