Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-089DATA SUBMITTAL COMPLIANCE REPORT 1/18/2019 Permit to Drill 2180890 Well Name/No. KUPARUK RIV UNIT 31-OILI.02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-029-21514-62-00 MD 11400 TVD 6347 Completion Date 10/14/2018 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION / Mud Log No ✓ Samples No ✓ Directional Survey Yes (/ DATA INFORMATION List of Logs Obtained: GR/Res Well Log Information: Log/ Electr Data Digital Dataset Type Med/Frmt Number Name ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data ED C 29951 Digital Data (from Master Well Data/Logs) Log Log Run Interval OH I Scale Media No Start Stop CH Received Comments 8366 11400 11/2/2018 Electronic Data Set, Filename: 31-01L7-02 GAMMA RES.Ias . 11/2/2018 Electronic File: 31-0lL1-02 21VID Final Log.cgm 11/2/2018 Electronic File: 31-0lLl-02 51VID Final Log.cgm 11/2/2018 Electronic File: 31-OIL1-02 5TVDSS Final Log.cgm 11/2/2018 Electronic File: 31-011-1-02 21VID Final.pdf 11/2/2018 Electronic File: 31-0l L1-02 51VID Final.pdf 11/2/2018 Electronic File: 31-01L1-02 5TVDSS Final.pdf 11/2/2018 Electronic File: 31-0l Ll -02 EOW-NAD27.pdf 11/2/2018 Electronic File: 31-01 L1-02 EOW - NAD27.txt 11/2/2018 Electronic File: 31-011-1-02 Final Surveys.csv 11/2/2018 Electronic File: 31-OlL1-02 Final Surveys.xlsx 11/2/2018 Electronic File: 31-011-1.02 Survey Listing.txt 11/2/2018 Electronic File: 31-011-1-02 Surveys.txt 11/2/2018 Electronic File: 31-011-1- 02_25_tapescan_BH I_CTK.txt 11/2/2018 Electronic File: 31-011-1- 02_5_tapescan_B H I_CTK.txt 11/2/2018 Electronic File: 31-011-1-02_output.tap 11/2/2018 Electronic File: 31-01L1-02 21VID Final Log.tif 11/2/2018 Electronic File: 31-01 L1-02 51VID Final Log.tif AOGCC Page 1 of 3 Friday, January 18, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/18/2019 Permit to Drill 2180890 Well NamelNo. KUPARUK RIV UNIT 31-01Ll-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029.21514-62-00 MD 11400 TVD 6347 Completion Date 10/14/2018 Completion Status 1-0I1 Current Status 1 -OIL UIC No ED C 29951 Digital Data 11/2/2018 Electronic File: 31-01 L1-02 5TVDSS Final Log.tif Log C 29951 Log Header Scans 0 0 2180890 KUPARUK RIV UNIT 3I.01L1-02 LOG HEADERS ED C 29975 Digital Data 11/7/2018 Electronic File: 31-OlLl-02 EOW - NAD27.pdf ED C 29975 Digital Data 11/7/2018 Electronic File: 31-OlLl-02 EOW - NAD27.txt ED C 29975 Digital Data 11/7/2018 Electronic File: 31-OlLl-02 EOW - NAD83.pdf ED C 29975 Digital Data 11/7/2018 Electronic File: 31-OlLl-02 EOW - NAD83.txt Log C 29975 Log Header Scans 0 0 2180890 KUPARUK RIV UNIT 31-OlLl-02 LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report V Production Test Informatior Y� NA Geologic Markers/Tops0 COMPLIANCE HISTORY Completion Date: 10/14/2018 Release Date: 8/30/2018 Description Comments: Directional / Inclination Data V Mud Logs, Image Files, Digital Data Y /A Core Chips y/ Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files O Core Photographs Y / Daily Operations Summary Cuttings Samples Y /QA Laboratory Analyses Y / Date Comments AOGCC Page 2 of 3 Friday, January 18, 2019 AOGCC Page 3 of 3 Friday, January 18, 2019 DATA SUBMITTAL COMPLIANCE REPORT 1/18/2019 Permit to Drill 2180890 Well NamelNo. KUPARUK RIV UNIT 31-01L1-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50.029-21514-62-00 MD 11400 T Compliance Reviewed 6347 omp tion D 10/14/2018 Completion Status 1-0I1- Current Status Date: 1-0I1 UIC No % / 16 / i 9 AOGCC Page 3 of 3 Friday, January 18, 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION NOV 13 2018 WELL COMPLETION OR RECOMPLETION REPORT AN 1 a. Well Status: Oil E] Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ 20AAC 25.105 20AAC 25.110 GINJ❑ WINJ❑ WAGE] WDSPL❑ No. of Completions: 1b. Well Class Development Exploratory E] Service E] Stratigraphic Test E] 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 10/14/2018 14. Permit to Drill Number / Sundry: 218-089 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 10/11/2018 15. API Number: 50-029-21514-62-00 4a. Location of Well (Governmental Section): Surface: 344' FSL, 179' FWL, Sec 31, T13N, RSE, UM Top of Productive Interval: 1301' FNL, 365' FEL, Sec 31, T13N, R9E, UM Total Depth: 1360' FNL, 2957' FWL, Sec 31, T13N, R9E, UM 8. Date TO Reached: 10113/2018 16. Well Name and Number: KRU 31-01Ll-02 9. Ref Elevations: KB 71 GL: 40 BF: 17. Field / Pool(s): Kupamk River FieldlKuparuk River Oil Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ADL 25521 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 508056 y- 6007286 Zone- 4 TPI: x- 512771 y- 6010926 Zone- 4 Total Depth: x- 510830 y- 6010864 Zone- 4 11. Total Depth MD/TVD: 1140016347 19, DNR Approval Number: LO/NS 83-130 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: 130011256 5. Directional or Inclination Survey: Yes E (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: NIA (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: 9126/6345 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16 62.5 H-40 31 104 31 104 24 274 sx CS II 9518 36 J-55 31 4346 31 3305 121/4 1650 sx AS III, 320 sx Class G 7 26 J-55 24 9010 24 6528 81/2 300 sx Class G and 175 sx ASI 23/8 4.6 L-80 8668 11400 6278 6347 3 Slotted Liner 24. Open to production or injection? Yes E No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): SLOTTED LINER @: COMPLETIONS DAJE 8669-11400 MD and 6278 - 6347 TVD... 10/13/2018 (9I (�� L$ VE`R�IF�I�ED MU 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 31/2 8747 8535/6179 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No E Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 10120/2018 Method of Operation (Flowing, gas lift, etc.): FLOWING Date of Test: 1012512018 Hours Tested: 18.8 Production for Test Period Oil -Bbl: 565.6 Gas -MCF: 441 Water -Bbl: 2178 Choke Size: 104 Gas -Oil Ratio: 780 Flow Tubing Press. 179 Casino Press: 1272 Calculated 24 -Hour Rate Oil -Bbl: Gas -MCF: 563 Water -Bbl: Oil Gravitv - API (corr): 21 Form 10-407 Revised 512017' y��Zl6 < �,, I(/C011pNUED ON PAGE 2 RBDMS �U n9V 1 3 2O1B Submit ORIGINIAL onl �C /^ri{fpl /�J w75 28. CORE DATA Conventional Core(s): Yes ❑ No D Sidewall Cores: Yes ❑ No 0 If Yes, list formations and intervals cored (MDfrVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1300 1256 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 9126 6345 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kuparuk A2 TD 11400 6347 Formation at total depth: I Ku aruk A3 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, pateontolouical report. production or well test results. per 20 AAC 25,070 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: Keith Herrin Authorized Title: Staff CTD Engineer Contact Email: Keith.E.Herrin co .com Authorized Contact Phone: 263-4321 Signature: Date: � 5 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water-A@ernating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vhrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 31-01 Proposed CTD Schematic 16' 82611-40 ehD o104'MD 9AI8' 366 J-55 shoe 0 4348' MD TOWB®e6B6'MD BI KOP (M am MD Bike By FMM1 BM FMM1 8,xk M WIMow AMBM pM ]aa•-e]6D•MD .and ced 8]N-6]68' MD IT- M.1 .nss ® 6010 MD 3-12' Cameo MMG gas lift mandrels an 3129 RKB Baker Orbit Valve Q 3596' MD 3.12' 9.36 LA0 EUE BN Tubing to surface 3.12" Cameo MMG gas fill marMrels @ 4929'. 6250', 7271', 8002', a 8 ' Baker Lautor ® 8517 RKB Baker PBR B0 D@8522'MD(3'ID) Baker FHL Packer @ 8535' MD (4' ID) 3-M' X ISMing nipple at SUB'MD (2.813" min ID) Top of Wedge Aseembiy Q 8698' RKB 3-M° X IaMirq nipple at 8712' MD (2.813' min ID) Top of Wedge Assembly Q 0728' RKB 3-X•' X lerpling nipple at 8742' MD (2.813' min ID) Baker WLEG @ 874T MO 3rywlW W MD iop W hM1-&MTMD Baulml0-Ilppa uD roi� �Mo�eoi�o 4:r.. S.ifY 4mM xn.. v] eLminum eha 1w1LsL3 ro-I—MD is Inas Mo eoi- Ii. uopm Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth StsnTime I End Time Dw(hr) Phase Op Code A Wtiy Code Time P -T -X Operation (W) End Depth (WB) 9/14/2018 9/14/2018 5.50 MIRU MOVE MOB P Pull off well, install jeeps, modules 0.0 0.0 12:00 17:30 lined up to head out. 9/14/2018 9114/2018 0.50 MIRU MOVE MOB P Made call to securtiy to start move, 0.0 0.0 17:30 18:00 informed that we won't start until last bus @ 18:30, stand by 9/14/2018 9/14/2018 0.50 MIRU MOVE MOB T Stand by for busses 0.0 0.0 18:00 18:30 9/14/2018 9/14/2018 1.50 MIRU MOVE MOB T Made call to start moving rig, informed 0.0 0.0 18:30 20:00 that it was fire training on sweat pad (1 C -access road), continue standing by 9/14/2018 9/15/2018 4.00 MIRU MOVE MOB P Mobilize rig towards 31 -pad 0.0 0.0 20:00 00:00 9/15/2018 9/15/2018 2.00 MIRU MOVE MOB P Continue moving rig towards 31 -pad 0.0 0.0 00:00 02:00 9/15/2018 9/1512018 1.00 MIRU MOVE MOB P On 31 pad, Remove jeeps. Prep cellar 0.0 0.0 02:00 03:00 for spotting rig. 9/15/2018 9115/2018 6.00 MIRU MOVE MOB P Spot rig. Work rig up check list 0.0 0.0 03:00 09:00 9115/2018 9/15/2018 4.50 MIRU WHDBOP NUND P RIG ACCEPT 09:00. Nipple up BOPE, 0.0 0.0 09:00 13:30 Service rig, Prep for BOPE test, trouble shoot swab two 9/15/2018 9115/2018 6.50 MIRU WHDBOP BOPE P Start full BOPE test, Test witnesed by 0.0 0.0 13:30 20:00 Brian Bixby AOGCC, Fail / Pass on Swab 2, R-2 and B-7 9/15/2018 9/1512018 2.40 MIRU WHDBOP PRTS P Pressure test PDUs & TT line to 2000 0.0 0.0 20:00 22:24 PSI, Line up to fill CT 9/15/2018 9/16/2018 1.60 SLOT WELLPR CTOP P Start filling CT, Boot wire Perform 0.0 0.0 22:24 00:00 slack Mgmt. Surge CT 3 times to 3.5 BPM. Unstab and see wire 4 feel up CT Stab back on and repeat. 9/16/2018 9/16/2018 0.70 SLOT WELLPR CTOP P Surge coil 3 more limes to 3.8 BPM. 0.0 0.0 00:00 00:42 did not hear wire move. Unstab. ut 5' CT have wire. Test E -line 131 Ohmes >2006Mohmes 9116/2018 9/16/2018 0.90 SLOT WELLPR CTOP P Prep coil. Install CTC, Pull test to 35K 0.0 0.0 00:42 01:36 9/16/2018 9/16/2018 0.60 SLOT WELLPR CTOP P Head up UQC, PT CTC and UQC to 0.0 0.0 01:36 02:12 4K 9/16/2018 9/16/2018 1.70 SLOT WELLPR PRTS P PT and chart inner reel valve / Iron. 0.0 0.0 02:12 03:54 R5 R6 and SRI needed to be serviced 9/16/2018 9/16/2018 0.50 SLOT WELLPR CIRC P Circ freshwater out of coil, Open SSV, 0.0 0.0 03:54 04:24 Open tangos. WHP=1240 PSI 9/1612018 9/16/2018 1.00 PRODI WHPST PULD P PJSM, PD BHA#1 window milling 0.0 74.3 04:24 05:24 BHA with 2.80 window mill, string reamer, .6° AKO motor 9/16/2018 9/16/2018 1.10 PRODI WHPST PULD P Skid injector, change out packoffs, 74.3 74.3 05:24 06:30 install checks, lest MWD, tag up and set depth 9116/2018 9/1612018 1.90 PRODI WHPST TRIP P RIH with window milling BHA#1 74.3 6,120.0 06:30 08:24 9/16/2018 9/16/2018 2.05 PRODI WHPST DLOG P Strip log HRZ and K1 (+6.5' 8,120.0 8,730.3 08:24 10:27 correction) down to lop of whipstock @5 ft/min, swap hole over to 8.7ppg Power -Pro solids free drilling mud 9/16/2018 9/16/2018 0.05 PROD1 WHPST TRIP P Dry tag TOW @ 8730.3', wt check 8,730.3 8,730.3 10:27 10:30 38K, come online with pumps at 2 BPM, 9/16/2018 9/16/2018 0.50 PRODI WHPST DISP P Finish displacing well to 8.7 pps power 8,730.3 8,703.0 10:30 11:00 1 1 -pro SF drilling mud 9/16/2018 9116/2018 0.30 PRODI WHPST TRIP P RBIH. and re -tag TOW at 8729.43' 8,703.0 8,729.4 11:00 11:18 1 Page 1137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time Ertl Time Dur(hr) phase op COAs AdWy Cade Time P -T -X opereu.O (fll(3) End Depth Most 9/16/2018 9/16/2018 8.70 PROD1 WHPST WPST P OBM, 1.8 bpm, freespin = 4240 psi, 8,729.4 8,733.8 1118 20:00 diff --440 psi, BHP=4124 psi, IA=119 psi bled to 630 psi, OA=164 psi, function test auto choke system at 12:15, 9116/2018 9/17/2018 4.00 PROD1 WHPST WPST P 8733.75, 1.79 BPM @ 4240 PSI FS, 8,733.8 8,735.2 20:00 00:00 BHP=4095 9/17/2018 9/17/2018 2.50 PROD1 WHPST WPST P Continue milling window off NS 8,735.2 8,736.0 00:00 02:30 1 lWhipstock 9/17/2018 9/17/2018 1.30 PROD1 WHPST WPST P Continue milling, 1.8 BPM @ 4240 8,736.0 8,736.7 02:30 03:48 PSI FS, BHP=4080 9/17/2018 9/17/2018 3.00 PROD1 WHPST WPST P Call 7" exit. 1.8 BPM @ 4240 PSI FS, 8,736.7 8,754.4 03:48 06:48 BHP=4090 9/17/2018 9/17/2018 0.15 PROD1 WHPST WPST P TD rathole, PUW 36 k 8,754.4 8,754.4 06:48 06:57 9/17/2018 9117/2018 1.40 PRODt WHPST REAM P Ream widow area as drilled TF, 300' 8,754.4 8,720.0 06:57 08:21 LOHS, 150' ROHS, and 180' of HS, dry dirft clean 9/17/2018 9/17/2018 0.45 PROD1 WHPST SIPB P PUH, obtain static pressure survey 8,720.0 8,632.0 08:21 08:48 above window, 12.0 ppg 9/17/2018 9117/2018 1.50 PROD1 WHPST TRIP P POOH, following MP 8,632.0 74.2 08:48 10:18 9/17/2018 9/17/2018 1.00 PROD1 WHPST PULD P At surface, tag up, space out, PUD 74.2 0.0 10:18 11:18 milling BHA 9/17/2018 9117/2018 0.25 PRODt WHPST PULD P LD tools 0.0 0.0 11:18 11:33 Note: Mills Gauged DSM - 2.79" nogo, String Reamer - 2.80" nogo 9/17/2018 9/17/2018 0.35 PROD1 WHPST CIRC P Flush surface lines and BOP stack 0.0 0.0 11:33 11:54 9/17/2018 9/17/2018 0.25 PROD1 DRILL PULD P PU/MU build section BHA 0.0 0.0 11:54 12:09 9/17/2018 9/17/2018 0.75 PROD1 DRILL PULD P PD build section BHA #2 0.0 72.2 12:09 12:54 9/17/2018 9/17/2018 0.25 PROD1 DRILL PULD P MU UQC, surface test Coilrak tools 72.2 72.2 12:54 13:09 (good -test) 9/17/2018 9/17/2018 0.25 PROD? DRILL PULD P Stab INJH, check pac-offs, tag up, 72.2 72.2 13:09 13:24 reset depth counters 9/17/2018 9117/2018 1.40 PROD1 DRILL TRIP P RIH 72.2 8,395.0 13:24 14:48 9/17/2018 9/17/2018 0.20 PROD1 DRILL DLOG P Log the K1 marker correction of minus 8,395.0 8,419.0 14:48 15:00 19.5' 9/17/2018 9/17/2018 0.20 PROD1 DRILL TRIP P Continue IH 8,419.0 8,754.4 15:00 15:12 9/17/2018 9/17/2018 1.10 PROD1 DRILL DRLG P OBD, 175 bpm at 4,095 psi, Diff --640 8,754.4 8,845.3 15:12 16:18 psi, WHP=256, BHP=4,000, IA=626, OA=164 9/17/2018 9/172018 0.20 PROD1 DRILL TRIP T Unable to achieve build rate, PUH, 8,845.3 8,701.0 16:18 16:30 PUW 35 K, AVG DLS=34° vs plan 45° 9/17/2018 9/17/2018 1.00 PROD1 DRILL TRIP T Open EDC, continue POOH 8,701.0 3,623.6 16:30 17:30 9/17/2018 9/17/2018 0.75 PROD1 DRILL TRIP T Function closed Orbit valve, check 3,623.6 3,623.6 17:30 18:15 well for flow (no -flow) Crew change 9/17/2018 9/17/2018 0.75 PROD1 DRILL TRIP T Continue POOH 3,623.6 72.2 18:15 19:00 9/17/2018 9/17/2018 0.25 PROD1 DRILL PULD T Tag up, check well for flow 72.2 72.2 19:00 19:15 9/17/2018 9/17/2018 0.60 PROD'/ DRILL PULD T Unstab INJH, swap out motor, inspect 72.2 0.0 19:15 19:51 j bit., Bit out 1-1 with chipped tooth on reamer Page 2137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sten Depth I Stert Time End Tim our (hr) Phase op Code Activity Code Tare P -T -X Operation Mal End Depth Me) 9/17/2018 9/17/2018 0.50 PROD1 DRILL PULD T PU/MU Build BHA#2 0.0 72.2 19:51 20:21 9/17/2018 9/17/2018 0.25 FROM DRILL PULD T Stab INJH, MU UQ, surface test 72.2 72.2 20:21 20:36 Coiltrak tools (good -test) 9/1712018 9/17/2018 0.50 PROD1 DRILL TRIP T RIH, following MP Schedule 72.2 3,500.0 20:36 21:06 9117/2018 9/17/2018 0.25 PROD1 DRILL TRIP T Function opened Orbit valve 3,500.0 3,500.0 21:06 21:21 9117/2018 9/17/2018 1.20 PROM DRILL TRIP T Continue IH 3,500.0 8,395.0 21:21 22:33 9/17/2018 9/17/2018 0.20 PROD1 DRILL DLOG T Log the K1, minus 21.5' correction 8,395.0 8,423.0 22:33 22:45 9/17/2018 9117/2018 0.20 PROM DRILL TRIP T Contiinue IH 8,423.0 8,749.0 22:45 22:57 9/1712018 9/17/2018 0.20 PROD1 DRILL DLOG T Log the RA marker 8,733' 8,749.0 8,755.0 22:57 23:09 9/1712018 9/1712018 0.20 PROD1 DRILL TRIP T Continue IH 8,755.0 8,845.0 23:09 23:21 9/17/2018 9/18/2018 0.65 PROD1 DRILL DRLG P OBD, 1.6 bppm at 3,724 psi, diff=3478 8,845.0 8,894.0 23:21 00:00 psi, WHP=292, BHP=4,066, IA=611, OA=159 9/18/2018 9118/2018 2.80 PROM DRILL DRLG P OBD, 1.6 bppm at 3,724 psi, diff -3478 8,894.0 9,170.0 00:00 02:48 psi, WHP=292, BHP=4,066, IA=611, OA=159 9118/2018 911812018 2.40 PROD1 DRILL TRIP P 9170', Call end of build, Pump 5 X 5 9,170.0 67.0 02:48 05:12 Sweeps, Avg DLS= 46.06° 9118/2018 9/18/2018 0.40 PROD1 DRILL PULD P At surface, Lay down BHA#3 67.0 0.0 05:12 05:36 9/18/2018 9/18/2018 0.90 PROD1 DRILL PULD P M/U BHA #4, L1 lateral drilling BHA 0.0 78.2 05:36 06:30 wtth .5° AKO motor, New HYC Al bicenler with 11 MM cuters, and agitator, M/U to coil and surface test. Equalize orbit valve and open 9/18/2018 9/18/2018 1.60 PROD1 DRILL TRIP P RIH, EDC closed, Shallow test agitator 78.2 8,400.0 06:30 08:06 @ 500'. Start new mud down CT @ 3500' 9/18/2018 9118/2018 0.20 PROM DRILL DLOG P Log K1 for -21.5, PUW=39K 8,400.0 8,445.0 08:06 08:18 9/18/2018 9/1812018 0.30 PROM DRILL TRIP P Continue in hole 8,445.0 9,157.0 08:18 08:36 9/18/2018 9/18/2018 0.30 PROM DRILL DRLG P 9157, Tag up 13' high. Pull off bottom. 9,157.0 8,750.0 08:36 08:54 PUH to log RA 9118/2018 9/18/2018 0.10 FROM DRILL DLOG P 8750 Log RA marker for -1" 8,750.0 8,769.0 08:54 09:00 9118/2010 9/18/2018 0.10 FROM DRILL TRIP P RBIH, tag up 2 9169' 6,769.0 9,169.0 09:00 09:06 9/18/2018 9/18/2018 2.80 PROD1 DRILL DRLG P 9169' Drill, 1.81 BPM @ 4527 PSI FS, 9,169.0 9,470.0 09:06 11:54 1 BHP=5783, New mud at bit 9/18/2018 9/18/2018 0.10 PROD1 DRILL WPRT P BHA wiper to get off tool stops, 9,470.0 9,470.0 11:54 12:00 PUW=39K 9118/2018 9/18/2018 0.90 FROM DRILL DRLG P 9470', Drill, 1.8 BPM @ 4790 PSI FS, 9,470.0 9,570.0 12:00 12:54 BHP=3964 9/1812018 9/18/2018 0.80 PROD1 DRILL WPRT P Wiper to 8800', PUW=39K, Frac sand 9,570.0 9,570.0 12:54 13:42 coming back in cuttings, Clean trip up and down 9/18/2018 9118/2018 3.60 PROD1 DRILL DRLG P 9570', drill, 1.8 BPM @4790 PSI FS, 9,570.0 9,970.0 13:42 17:18 BHP=4023, RIW=14.3K 9118/2018 9118/2018-1-0 40 PROD1 DRILL WPRT P Wiper up -hole, PUW=41K 9,970.0 8,800.0 17:18 17:42 Page 3137 Report Printed: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth swThie End Time Dur(hn phase op code Activity Code rime P -T -X Operation (fits End Depth(hKB) 9/18/2018 9/18/2018 1.20 PROD? DRILL WPRT P Wiper in-hole, losing CWT, PU, reduce 8,800.0 9,970.0 17:42 18:54 rule & speed, get to bottom, continue _ to have significant frac sand over shakers 9/18/2018 9/18/2018 0.80 PROM DRILL DRLG P Drill, CWT = OK, WOB = 1.4K, BHP = 9,970.0 10,022.0 18:54 19:42 4088 psi, WHP = 175 psi, pump 5x5 sweeps 9/18/2018 9/18/2018 0.40 PROD1 DRILL WPRT P Pull early wiper to clean up hole, PUW 10,022.0 8,683.0 19:42 20:06 = 41K, continued significant frac sand overshaker 9/18/2018 9/18/2018 0.70 PROD1 DRILL WPRT P Wiper in-hole, log RA for+2.5' 8,683.0 9,250.0 20:06 20:48 corretion, stacking weight at -9250', PUH, dragging weight (-42K CWT & - 2K negative WOB) 9/18/2018 9/18/2018 2.00 PROD1 DRILL CIRC P Pump 5x5 sweeps, decision made to 9,250.0 8,880.0 20:48 22:48 continue slowly uphole cleaning up above BHA, pump numerous additional sweeps, 7 bottoms up & continue to have significant frac sand in samples (not cleaning up) 9/18/2018 9/18/2018 0.90 PROD1 DRILL CIRC P Pull into cased hole, circulate bottoms 8,880.0 7,600.0 22:48 23:42 up, jog up to 7600', jog produced increased amount of cuttiing/frac sand overshaker 9/18/2018 9/19/2018 0.30 PROD1 DRILL CIRC P RBIH to 8600', begin another jog up to 7,600.0 8,600.0 23:42 00:00 7600' 9/19/2018 9/19/2018 0.80 PROD1 DRILL CIRC P Continue jog to 7600', density out up 8,600.0 8,600.0 00:00 00:48 to 9.06 ppg, RBIH to 8600, repeat, continued large quantities of frac sand over shaker (near 100% frac sand w/reduction in cuttings) 9/19/2018 9/19/2018 0.70 PROM DRILL CIRC P Pump sweeps & jog again to 7600', 8,600.0 8,600.0 00:48 01:30 minimal cuttings/frac sand over shakers 9/19/2018 9/19/2018 1.00 PROD1 DRILL WPRT P Attempt to RBIH to drill, log RAfor+2' 8,600.0 8,732.0 01:30 02:30 correction, stack weight at 9210% continue stacking weight through 9240', PUH, dragging heavy 50K CWT & -7K WOB, packing off, significant motor work, get to 8777', -7K WOB, RBIH, stack 8K WOB at 8784', pull to 60K through window, can orient, pumps down coming through window, unable to move pipe 9/19/2018 9/19/2018 1.70 PROM DRILL CIRC T Confer wttown, await instructions on 8,732.0 8,732.0 02:30 04:12 bringing up pump, can orient, bring rate to .25 bpm, have returns, attempt Ito pull up, pull to -7K WOB 9/19/2018 9/19/2018 1.80 PROD1 DRILL CIRC T Continue to circulate al .25 bpm 8,732.0 8,732.0 04:12 06:00 attempting to work pipe up and down intermittenffy, then allow additional circulation time, no success, confer w/ town, bring rate up to .5 bpm, 1 for 1 returns, unable to break free 9/19/2018 9/19/2018 2.70 PROM DRILL CIRC T Crew chane, Bring pump rate up to 8,732.0 8,732.0 06:00 08:42 1.54 BPM. Unable to orient at this rate. Diff pressure Q 1700 PSI if not stalled at near stall. Circulating 1 to 1. Work pipe up to 52K =-15K DHWOB. Down to -1 OK DHWOB. No movement. Pump two serls of 5 X 5 sweeps to clear up hole. Page 4137 ReportPrinted: 10/15/2018 a Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time FSE Time our (no Phase Do Code Activity Code Time P -T -X Operation (ftKB) End Depth (WB) 9/19/2018 9/19/2016 0.70 PROD1 DRILL CIRC T Line up to pump down backside, .2 8,732.0 8,732.0 08:42 09:24 BPM Q 1750 PSI WHP. Unable to pump rate down backside. Line back up to coil. Working choke and pump got free going down 9/19/2018 9/19/2018 0.50 PROD1 DRILL WPRT T RIH Pumping 1.25 BPM. Start sweeps 8,732.0 8,770.0 09:24 09:54 down CT. Packing off, stuck @ 8770. Work pipe pull free. 55K 9/19/2018 9/19/2018 0.50 PROD1 DRILL CIRC T Pulling uphole, sweeps coming out. 8,770.0 8,731.0 09:54 10:24 Take a couple of runs at window at different orientations. Hanging up unable to come up through window able to run back in hole. Become stuck in window. Work pipe up and down. Increase WHIP. Pop free woking down. Pull up through window 9/19/2018 9/19/2018 0.30 PROD1 DRILL WPRT P Pull uphole 8,731.0 8,390.0 10:24 10:42 9/19/2018 9/19/2018 0.20 PROD1 DRILL DLOG P Log K1 for +3'corection 8,390.0 8,422.0 10:42 10:54 9/19/2018 9/19/2018 0.70 PROD1 DRILL TRIP P RBIH to clean up seconday, wedge 8,422.0 8,715.0 10:54 11:36 setting area, Recip area, pump sweeps 9/19/2018 9/19/2018 1.80 PROD1 DRILL TRIP P POOH, EDC closed 8,715.0 64.8 11:36 13:24 9/19/2018 9/19/2018 1.30 PROD1 DRILL PULD P At surace, Tag up and space out. 64.8 0.0 13:24 14:42 PJSM PUD BHA#4. BHA out with no scrape marks on string. Motor has 1 fill port missing. Bit out with 2 chipped teeth on reamer 9/19/2018 9/19/2018 3.60 PROD1 DRILL SLKL T R/U slick line / PDS caliper to 0.0 0.0 14:42 18:18 diagnose window problems, PT to 1800 psi 9/19/2018 9/19/2018 2.70 PROW DRILL SLKL T RIH with caliper on slick -line, log 8760' 0.0 0.0 18:16 21:00 to 8400', POOH 9/19/2018 9/19/2018 1.00 PROD1 DRILL SLKL T Break off lubricator, RD caliper, PDS 0.0 0.0 21:00 22:00 rep performed intial data evaluation, insufficient data, did not fully exit window 9119/2018 9/20/2018 2.00 PROD1 DRILL SLKL T RU caliper to repeat run, RIH to 8790', 0.0 8,790.0 22:00 00:00 1 1 1 await arm timer, log 8785'to 8400' 9/20/2018 9/20/2018 PROD1 00:00 00:00 9/20/2018 9/20/2018 1.20 PROD1 DRILL SLKL T Await caliper timer, complete caliper 8,790.0 0.0 00:00 01:12 run, POOH, tag up 9/20/2018 9/20/2018 0.30 PROD1 DRILL SLKL T PJSM, pop off lubricator, RD caliper, 0.0 0.0 01:12 01:30 stab lubricator back on 9/20/2018 9/20/2018 2.70 PROD1 DRILL SLKL T Await caliper data processing (rush 0.0 0.0 01:30 04:12 job requested) 0.6' AKO motor ready, X -Lock located & ready for delivery, NS Wedge ready for delivery, PDL pre -loaded 9/2012018 9/20/2018 1.30 PROD1 DRILL SLKL T Recieve & evaluate caliper data, await 0.0 0.0 04:12 05:30 plan forward 9/20/2018 9/20/2018 0.70 PROD1 DRILL SLKL T Plan forward to run crayola mill in 0.0 0.0 05:30 06:12 window, rig down slick line 9/20/2018 9/20/2018 1.50 PROD1 DRILL PULD T PJSM, PD pre loaded BHA#5 with 0.0 62.8 06:12 07:42 2.79 Cmyola mill, .6° AKO motor. Make up injecor andsurface lest 9/20/2018 9/20/2018 1.50 PROD? DRILL TRIP T Trip in hole BHA #5, EDC open 62.8 8,400.0 07:42 09:12 Page 5/37 Report Printed: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Smit Depth Sum nme Entl Time Dur (N) Phase Op Code Acthiy Code Time P -T -X operatl (fixe) I End Depth(WEn 9/20/2018 9/20/2018 0.20 PRODi DRILL DLOG T Log K1 for -1 8'correction, PUW=34K, 8,400.0 8,428.0 09:12 09:24 Close EDC 9/2012018 9/2012018 0.20 PRODi DRILL TRIP T Continue in well 8,428.0 8,715.0 09:24 09:36 9/2012018 9/20/2018 4.00 PRODt DRILL MILL T 8715, Pumps on 1.8 BPM @ 3890 PSI 8,715.0 8,740.0 09:36 13:36 FS, BHP=3867, Stall at 8734, Pick up and restart. Mill down to 8740. Perform passes @ 30L, 30R, 180R. Dry drift window- looks good. pump sweeps. No material on shaker 9/20/2018 9/20/2018 1.80 PROD1 DRILL TRIP T 8740, Trip out of hole 8,740.0 47.9 13:36 15:24 9/2012018 9120/2018 0.90 PROD1 DRILL PULD T At surace, tag up and space out. 47.9 0.0 15:24 16:18 PJSM, PUD BHA#5. Mill out @ 2.79 NoGo 9/2012018 9/20/2018 0.80 PROD1 DRILL PULD T PJSM, PD BHA#6 with 2.74 D-331 0.0 62.0 16:18 17.06 ridgeset with up cutters on 1 ° AKO motor. No agitaor 9/2012018 9/20/2018 1.60 PROD1 DRILL TRIP T RIH w/ BHA #6 62.0 8,407.0 17:06 18:42 9/20/2016 9/20/2018 0.20 PROD1 DRILL DLOG T Log K1 for -17.5' correction, PUW = 8,407.0 8,438.0 1842 1854 134K, dose EDC 9/20/2018 9/20/2018 0.50 PROD1 DRILL TRIP T Cotinue RIH to 8811', rate in = 1.8 8,438.0 8,811.0 18:54 19:24 bpm, FS = 513 psi, BHP = 3926 psi, WHIP = 215 psi, clean through window (entire BHA), PUW = 37K, pull BHA back up through window, clean, RBIH 9/20/2018 9/20/2018 0.30 PROD1 DRILL TRIP T Continue FCO, FS = 510 psi, BHP = 8,811.0 8,876.0 19:24 19:42 3952, CWT= 17.5K Stack weight at: 8850', WOB = 2K, PUW = 37K 8,863', WOB = 2.5K, PUW = 37K 8850', WOB = 4.8K, PUW = 37K 8876', WOB = 2.6K, PUW = 38K, dragging negative WOB (-7K), dp = 1130 psi 9/20/2018 9/20/2018 0.80 PROD1 DRILL TRIP T Pump 5x5 sweeps, frac sand over 8,876.0 8,952.0 19:42 20:30 shakers, wiper up through window, RBIH Stack weight at 8869', packing off, PUW = 40K, majority dirt w/ frac sand over shaker, pump 5x5 sweeps, stack at 8913', continue to take small bites & pull BHA wipers, begiin to pack off at 8853', begin to go into stall 9/2012018 9120/2018 1.10 PRODi DRILL WPRT T Wiper to 7600', PUW = 38K, large 8,952.0 8,952.0 20:30 21:36 quantities of frac sand over shakers, RBIH 9/2012018 9/20/2018 0.80 PROW DRILL TRIP T Continue FCO, FS = 516 psi, BHP = 8,952.0 9,160.0 21:36 22:24 4000 psi, pump 5x5 sweeps, stack at 9158', PUW = 50K, stack higher at 9144', begin packing off& dragging heavy 9/20/2018 9/20/2018 0.30 PROD1 DRILL WPRT T Wiper, PUW =40K, packing off at 9,160.0 9,160.0 22:24 22:42 8811', jog down -hole, continue wiper to 8500', jog down to 8700', RBIH, stack weight 8850'- 8875', work interval, stack multiple times at 9148' 9/20/2018 9/21/2018 1.30 PROD1 DRILL TRIP T Continue from 9160', FS = 515 psi, 9,160.0 9,173.0 22:42 00:00 1 BHP = 4032 psi, Page 6137 Report Printed: 1011512018 . Operations Summary (with Timelog Depths) 31-01 • w Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Star) Depth StartTime EndTim Dur(hr) Phew Op Code Acbriry Code Txre P-T-X Operation (fINB) End Depth(fKB) 9/21/2018 9/21/2018 0.20 PROD1 DRILL TRIP T Working back down to 9173', FS = 9,173.0 9,174.0 00:00 00:12 500 psi, BHP = 4037 psi, difficulty working back to 9173', short pack-off events, dragging heavy on PU's 9/21/2018 9/21/2018 1.20 PROD1 DRILL WPRT T Begin 400'wiper, PUW=41 K, pack- 9,174.0 8,700.0 00:12 01:24 off at 8900' while PUH, unable to maintain 1.8 bpm as ECD climbs to 14 ppg, able to orient, have reduced flow out, drop speed to 2 fpm up-hole, allow flow to erode pack-off increasing rate as BHP allows, Work through pack-off, take 60 bbl to tiger tank (1.25 bottoms up, density out looks good), pull through window, dean 9/21/2018 9/21/2018 2.20 PROD1 DRILL CIRC T Pump sweeps, pull up to 7600' (50 8,700.0 8,700.0 01:24 03:36 fpm), circulate bottoms up, repeat jog to 7600' (100 fpm), significant frac sand over shakers, trace amounts of small glass/epoxy type pieces in cuttings (puple in color, -1/4" in size) 9/21/2018 9/21/2018 1.40 PROD? DRILL TRIP T RBIH, taking small bites, followed by 8,700.0 9,019.0 03:36 05:00 short BHA wiper attempting to work £II above BHA, working down to 9174', pumping 5x5 sweeps, FS = 505 psi, BHP = 4021 psi 9121/2018 9/21/2018 0.70 PRODi DRILL TRIP T Continue working down from 9019' 9,019.0 9,120.0 05:00 05:42 912112018 9121/2018 0.40 PRODi DRILL TRIP T Pull wiper to window and back in 9,120.0 9,120.0 05:42 06:06 9121/2018 9121/2018 0.90 PRODt DRILL TRIP T 9120 Small bites 10-20 fl. then BHA 9,120.0 9,177.0 06:06 07:00 Wiper 9/21/2018 9121/2018 0.30 PROD1 DRILL TRIP T Pull wiper to window at 8850 pulling 9,177.0 9,177.0 07:00 07:18 heavy, Packing off, try cleaning up area, work pipe, recip 9/21/2018 9/21/2018 1.50 PROD1 DRILL TRIP T Still looks like packing off but now 9,177.0 8,720.0 07:18 08:48 suspect packing at surface, Open tango valves to obtain back up WHP, Well head not at zero as shown by normal gauge, returns been at 1 for 1. Packed off upstream from WHP transducer 9/21/2018 9/21/2018 0.50 PROD1 DRILL CIRC T 8720, in casing, elm bottoms up while 8,720.0 8,629.0 08:48 09:18 pulling up hole 9/21/2018 9121/2018 2.60 PROD1 DRILL SVRG T Bottoms up clear, Shut down and blow 8,629.0 8,629.0 09:18 11:54 down mico motion. No good. Break out micro motion. Run snake through 8. Was clear. Inspect reducing nipple upstream of micro motion. Packed tight with resin chunks. Break hardline apart and dear. Put everything back together. Change out WHP transducer by MP 13 9/2112018 9/21/2018 0.90 PROD1 DRILL TRIP T Break circulation, Trip in to 8890 clean 8,629.0 8,890.0 11:54 12:48 through window, PUH to inspect choke, Swap to choke A and service choke B 9/21/2018 9/21/2018 0.90 PROD? DRILL TRIP T RBIH to 9146, PUH Micro motion 8,890.0 8,698.0 12:48 13:42 plugging off, By pass micro motion 9/21/2018 9/21/2018 0.90 PROD1 DRILL TRIP T RIH, 1.8 BPM, run down to 9150 and 8,698.0 9,202.0 13:42 14:36 wipe up to 9103, RBIH to 9192 work down to 9202 Page 7137 ReportPrinted: 1011512018 . Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depm Start Time End Time Dur thr) Phase Op Code Activity Code Time P-T.X Operation MIKE) End Depth(MB) 9/21/2018 9/21/2018 1.70 PROW DRILL TRIP T 9202, PUH to 8860 work pipe down 9,202.0 8,750.0 14:36 16:18 stacking out4.6K DHWOB. Pick up to 52K, continue trying to go down. No go. Work up to 8762. Unable to go down or up. 9/21/2018 9/21/2018 0.30 PROD1 DRILL CIRC T Shut down pump to relax motor stall. 8,750.0 8,750.0 16:18 16:36 Work down. Unable to move up or down. Unable to get air through micro motion after trying o flush with water. Work up to 70K 9/2112018 9/21/2018 1.40 PROD1 DRILL CIRC T Continue working on micro motion. 8,750.0 8,750.0 16:36 18:00 Pump sweeps in prepemlion for LVT 9/21/2018 9/21/2018 1.00 PROD1 DRILL CIRC T Confer with town, pumps sweeps, 8,750.0 8,744.0 18:00 19:00 circulate 1.5 bottoms up after sweeps exit bit, pump 14 bbl LVT, 5 bbl out the bit (top @ -7718), drop pumps, shut in choke, lel soak, BHP climbs to 4600 psi, WHIP climbs to 1727 psi, work pipe upt to 80K, 2 bbl more LVT out the bit, let soak in tension, break free at 70K tension, stuck again at -8742' Gather manual straps of pits (MM bypassed), strap indicates 1 bpm losses, reduce rate to 1 bpm 9/21/2018 9/21/2018 1.70 PROD1 DRILL CIRC T 7 bbl LVT total out bit (top = 7301'), 8,744.0 8,744.0 19:00 20:42 can orient, lel soak in tension, 11 bbl LVT out the bit, let soak in tension, work pipe, let soak in compression, pump additional LVT in compression, all LVT out, let soak, work pipe, no success, Begin working pipe pumping again, no success 9/21/2018 9/21/2018 1.00 PROD1 DRILL CIRC T Confer with town on plan forward, 8,744.0 8,744.0 20:42 21:42 build low vis sweeps and plan to pump while in compression 9/21/2018 9/21/2018 1.70 PROD1 DRILL CIRC T Pump 10x10 (1.8 bpm) in 8,744.0 8,744.0 21:42 23:24 compression, -1 bpm losses, BHP = 4000 psi, WHP = 604 psi, WOB = 8K, with sweep well above BHA begin working pipe, no success 9/21/2018 9/22/2018 0.60 PROD1 DRILL CIRC T PJSM, discuss plan to pump down the 8,744.0 8,744.0 23:24 00:00 back -side, targeting 2200 psi WHIP, ensure coil has trapped pressure, watch dp over ( not to exceed Max dp over EDC = 1400 psi), bring WHIP to 2600 psi, work pipe, no success, sit in -1 OK CWT compression 9/22/2018 9/2212018 2.50 PROD? DRILL CIRC T Continue in compression, pumping 8,744.0 8,744.0 00:00 02:30 down back -side, work pipe in down- hole direction, no success, work WHIP & pipe, sit in compression, continue to work in down direction 9/22/2018 9/22/2018 1.40 PROD1 DRILL CIRC T Work pipe up -hole, no success 8,744.0 8,744.0 02:30 03:54 9/22/2018 9/22/2018 3.20 PROD1 DRILL CIRC T Confer w/ town, decision made to 8,744.0 8,744.0 03:54 07:06 open EDC, circulate, mobilize BOT to fish SBHP: BHP= 4427 psi, TVD sensor = 6314.84, EMW = 13.5 ppg Page 8137 Report Printed: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End lane Dw(ho phase op Cale A Wty Code Tana P -T -X op.tan (W13) End Depth(W-B) 9/22/2018 9/22/2018 0.10 PROD1 DRILL CIRC T Shut down pump, Close EDC, work 8,744.0 8,744.0 07:06 07:12 pipe -16 to +80 3 cycles, no movement 9/22/2018 9/2212018 1.20 PROD? DRILL PRTS T Perform static pressure lest, Inial #'s 8,744.0 8,744.0 07:12 08:24 WHP=1426, EMW=13.12, Bleed off WHP to 600 PSI, BHP to 4118 after 10 minutes, 2nd bleed HP down to 3783PSI, Built up to 4096 After 10 minutes. Bleed 3rd time 3714PSI build to 4074 PSI after 10 minutes. Bleed off while working pipe. Final PT after 20 minutes 3775 PSI, EMW=12.28 9/22/2018 9/22/2018 0.20 PROM DRILL FISH T Send release tool command, See data 8,744.0 8,744.0 08:24 08:36 drop off, Pick up free @ 42K. Subtract 46.3' from counters. tool left in hole 9122/2018 9/22/2018 0.90 PROD1 DRILL SVRG T Blow down MM and lines. Pull off 8,744.0 8,744.0 08:36 09:30 micro motion and snake out more resin pieces. reinstall 9/22/2018 9/2212018 1.40 PROD1 DRILL TRIP T POOH with CTC, UQC, LQC, D97,8,744.0 9.0 09:30 10:54 Wear sub, P&C, upper portion of EDC, 15.99', Left in hole, D -3312.740D mill, 2 318" motor, flapper valve sub, Hydraulic orienter, Drilling gamma sub, Drilling performance sub, lower setion of EDC. Length 46.33' 9/22/2018 9122/2018 0.40 PROD1 DRILL PULD T Al surface, Gose swab, Pull BHA #6 9.0 0.0 1054 11:18 from well and lay down 9/22/2018 9/2212018 2.20 FROM DRILL PULD T PJSM, M/U BHA#7 with 2 1/2" GS, 0.0 68.0 11:18 13:30 Up Down jars, weight bars, Accelorater with coil trac. Pressure deploy, Surface test 9/2212018 9/22/2018 1.60 PROD1 DRILL TRIP T Trip in hole, EDC shut pumping min 68.0 8,400.0 13:30 15:06 rate 9/22/2018 9/22/2018 0.20 PROD1 DRILL DLOG T Log Kt for -15', PUW=35K 8,400.0 8,423.0 15:06 15:18 9/2212018 9122/2018 0.30 PROD1 DRILL TRIP T Continue in well, Set down @ 8711', 8,423.0 8,711.0 15:18 15:36 PUH to confirm latch 9/22/2018 9/22/2018 3.50 PROD1 DRILL FISH T Begin jaring down for 15 cycles at 8K 8,711.0 8,711.0 15:36 19:06 down no movement. Begin jaring down and up, 62K up 0 down, continue jarring 60 cycles, dump well- head pressure to zero, attempt 10 more licks, release off GS to perform pipe fatique management 9/2212018 9/2212018 1.50 PROM DRILL TRIP T POOH 8,711.0 65.0 19:06 20:36 9/22/2018 9/2212018 1.00 PROD1 DRILL PULD T PJSM, PUD BHA#7 65.0 0.0 20:36 21:36 9/22/2018 9/22/2018 1.40 PRODt DRILL CIRC T MU nozzle, stab on, roll coil to fresh 0.0 0.0 21:36 23:00 water, jet stack, pop off, clear floor 9122/2018 9/23/2018 1.00 PRODt DRILL BOPE P PJSM, function test BOPE's, clear 0.0 0.0 23:00 00:00 floor, begin change out ring on love - joy (in SIMOPS) 9/23/2018 9123/2018 0.50 PROD1 DRILL RGRP T Continue work on love -joy (charting 0.0 0.0 00:00 00:30 out ring) 9123/2018 1.00 PROD1 DRILL CTOP T Epoxy & heat shrink a -line end, slide 0.0 0.0 00:30 01:30 cart in, stab on, pump slack back, up 19123/2018 1 1 to 3 bpm (4500 psi), heard a -line rattling Page 9/37 ReportPrinted: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Tore EM Time Mir (hr) Phan op code Activtly Code Time P -T -X Operation inks) End DepM(flka) 9/23/2018 9123/2018 3.00 PROD1 DRILL CTOP T Pop off, rig up hydraulic cutter, cut 0.0 0.0 01:30 04:30 coil, found e4ine in 35', cut total of 300' of pipe, rig down cutter, make final hand cut, lest a -line, ream coil, install Kendle connector, dimpler broke ram shaft, replace. Pull Test to 70K 9/23/2018 9123/2018 0.90 PROD1 DRILL CTOP T Re -head a -line, / UQC PT to 4000PSI 0.0 0.0 04:30 05:24 9/23/2018 9123/2018 0.80 PROD1 DRILL CTOP T Make up n=le. stab on, displace coil 0.0 0.0 05:24 06:12 1 back to mud. 9/23/2018 9/23/2018 1.30 PROD1 DRILL PULD T PJSM, M/U BHA#8 with 2.5" GS and 0.0 54.4 06:12 07:30 2.13 Hipp Tripper. M/U to coil trac. WU to coil and surface test. Good test. Inspect pack offs. 9/23/2018 9123/2018 1.60 PROD? DRILL TRIP T RIH BHA#8 54.4 8,390.0 07:30 09:06 9/23/2018 9/23/2018 0.20 PROD1 DRILL DLOG T Log K1 for -17', PUW=35K, Close 8,390.0 8,401.0 09:06 09:18 1 1 EDC 9/232018 9/23/2018 0.20 PROD1 DRILL TRIP T Continue in to top of fish @ 8709 dry, 8,401.0 8,709.0 09:18 09:30 18707 with pumps 9/232018 9/23/2018 1.40 PROD1 DRILL FISH T Set down on top of fish. PUH to 8,707.0 8,707.0 09:30 10:54 ensure latch, 40K PUW, -7 DHWOB, slack off, bring pump on to check for vibration. 1.11 BPM @ 4050 PSI. work down @.1 fl. Stall at 8707. Pick up and restart. Run 2.6 K DHWOB. Start 8 BBI slug of LVF down CT. continue working in compression 9123/2018 91232018 1.00 PROD1 DRILL FISH T Shut down and lel LVT soak around 8,707.0 5,707.0 10:54 11:54 fish 10 minutes, continue hipp tripping down. .97 BPM @ 4039 PSI. 9232018 9232018 0.60 PROD1 DRILL FISH T Start working Hip Tripper in tension. 8,707.0 8,707.0 11:54 12:30 61 K, DHWOB=-19K. Continue slowly increaseing tension to 70K then work up and down 9123/2018 9232018 0.20 PROD1 DRILL FISH T Stall, PU and release, possibly have 8,707.0 8,707.0 12:30 12:42 top of fish @ 8505 9/23/2018 9/23/2018 0.30 PROD1 DRILL FISH T Continue to workwork down 8,707.0 8,707.0 12:42 13:00 9/23/2018 9/23/2018 0.10 PROD1 DRILL FISH T Releae from fish. PUH for tie in 8,707.0 8,380.0 13:00 13:06 9123/2018 923/2018 0.10 PROD? DRILL DLOG T Log K1 for+5' 8,380.0 8,409.6- 13:06 13:12 9/232018 923/2018 020 PROD1 DRILL TRIP T RBIH to confirm TOF, Latch dry @ 8,409.0 8,709.0 13:12 13:24 8709 dry. Fish has not moved 9/232018 923/2018 0.30 PRODi DRILL FISH T Hip tripper loosing action. Start 8,709.0 8,695.0 13:24 13:42 working pipe up to 80K observed fish letting go weight droped to 26K. PUH still latched fish lodged. work pipe up Ito 85 K and down 9/232018 923/2018 0.20 PROW DRILL TRIP T PUH to tie in 8,695.0 8,380.0 13:42 13:54 9123/2018 923/2018 0.10 PROD1 DRILL DLOG T Log kt for =1.5' 8,380.0 8,407.0 13:54 14:00 9/232018 923/2018 0.20 PRODt DRILL FISH T RBIH to check top of fish. Tag up @ 8,407.0 8,698.0 14:00 14:12 8698. Fish has moved up hole. Work pipe to 80 K 9123/2018 9/23/2018 1.90 PROD1 DRILL TRIP T Release from fish, POOH BHA #8 for 8,698.0 35.4 14:12 16:06 Jars 923/2018 9/23/2018 1.20 PROD1 DRILL PULD T At surface, PJSM, PUDBHA#8 35.4 0.0 16:06 17:18 1 Page 10137 Report Printed: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depm Slav Tmme End Time Our(hr) Phase op code Activity Code Time P -T -X Operation (MB) End Depth(fiKB) 9/23/2018 9/2312018 0.30 PRODI DRILL PULD T PJSM, PU & put BOT up/down jars, 3 0.0 25.0 17:18 17:36 weight bars, & accelleralor in-hole 9/23/2018 9/2312018 1.80 PRODI DRILL RGRP T Change out goose -neck rollers, crew 25.0 25.0 17:36 19:24 change out 9/23/2018 9/23/2018 1.20 PROM DRILL PULD T PD BHA #9 (aceleator, 3 weight bars, 25.0 66.0 19:24 20:36 up/down jars), slide in cart, check pack -offs, good, MU to coil, tag up, set counters 9/23/2018 9/23/2018 1.60 PRODI DRILL TRIP T RIH w/ BHA#9 66.0 8,400.0 20:36 22:12 9/23/2018 9/23/2018 0.30 PROD1 DRILL DLOG T Log K1 for -16' correction, PUW = 8,400.0 8,422.0 22:12 22:30 35K, attempt to close EDC, position error on EDC, calibrate, EDC closed 9/23/2018 91232018 0.20 PROD1 DRILL TRIP T RIH, tag & latch into fish at 8699' 8,422.0 8,698.0 22:30 22:42 9/23/2018 924/2018 1.30 PROM DRILL FISH T Jar down on fish (20 licks), no 8,698.0 8,698.0 22:42 00:00 success, jar up 15 (16 licks), sit in tension @ 80K 9/24/2018 924/2018 1.90 PROD1 DRILL FISH T Prep LVT(sitting in 80K tension), drop 8,698.0 8,698.0 00:00 01:54 to nuetral weight, pump 14 bbl LVT, w/ 14 bbl LVT out bit, bullhead LVT 7 bbl below fish (.25 bpm, 2500 psi WHP) 9/24/2018 924/2018 0.60 PROM DRILL FISH T Work jars down (101icks down to -1 OK 8,698.0 8,698.0 01:54 02:30 WOB), work jars up (10 licks) 9/24/2018 9/24/2018 0.70 PROM DRILL FISH T Bullhead remaining 7 Me LVT below 8,698.0 8,698.0 02:30 03:12 fish 9/24/2018 924/2018 1.00 PROM DRILL FISH T Jar up (5 licks), jar down (5 licks), 8,698.0 8,698.0 03:12 04:12 increase WHIP to 2500 psi, jar up 5 licks dropping WHP, pulling to 80K+, no movement on fish 9/2412018 9/24/2018 1.50 PROD1 DRILL TRIP T POOH w/ BHA #9 (no fish) 8,698.0 63.0 04:12 05:42 9/2412018 9/2412018 1.40 PRODI DRILL PULD T At surface, PJSM, PUD BHA #9 63.0 0.0 05:42 07:06 Fishing BHA w/Jars, Lay down BOT tools 9/24/2018 9/24/2018 4.40 PRODI DRILL CTOP T PJSM, remove UQC, Boot wire for 0.0 0.0 07:06 11:30 slack mgmt, stab on well, Reverse circulate CT. Un Stab injector. M1U CT cutter. Cul 14' CT find wire. Cut 200' coil for fatigue mgmt. M/U CTC, Pull test to 70K. Test wire - Good. MIU UQC. PT UQC & CTC 9/24/2018 9/242018 4.00 PROM DRILL RGRP T Indenlified leak in inner reel iron at 3 X 0.0 0.0 11:30 15:30 2 crossover. Remove pressure bulkhead and inner reel iron to replace hardline gasket in hardline. Replace reel iron and pressure bulkhead while waiting on orders 9/24/2018 9/24/2018 0.10 PRODI DRILL CTOP T Obtain 5000 PT on inner reel iron 0.0 0.0 15:30 15:36 9/24/2018 9/242018 0.30 PROD1 DRILL CTOP T Break off pressure test plate, Install 0.0 0.0 15:36 15:54 1 1 lNozzle. P/U QTS off riser 9/242018 9/24/2018 0.10 PRODI DRILL CTOP T Test E -line & polarity post pressure 0.0 0.0 15:54 1600 bulkhead - Good 9/24/2018 9/24/2018 0.50 PROD1 DRILL PULD T Swap out BHA in PDL from Hip tripper 0.0 0.0 16:00 16:30 run to at whipstock 9/24/2018 9/2412018 1.50 PROM DRILL W WSP T Check all tree tinge bolts for torque 0.0 0.0 16:30 18:00 9/24/2018 9242018 0.80 PROM DRILL SFTY T Crew change, run valve check list. 0.0 0.0 18:00 18:48 Prep to make up whipstock 9/24/2018 9/24/2018 1.50 PRODI RPEQPT PULD P PJSM, M/U whipstock and pressure 0.0 73.4 18:48 20:18 deploy. M/U to CT and surface test. Tag up and set counters Page 11137 Report Printed: 10/15120- Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SW Depth Stars Time End Time our (hrl Phase Op Code Activity Code Time P -T -x Operation Y") End Depth(fi(B) 9/2412018 9/24/2018 1.90 PROD1 RPEQPT TRIP P Trip in well, BHA # 10 Whipstock 73.5 8,410.0 20:18 22:12 9/2412018 9/24/2018 0.20 PR0D1 RPEQPT DLOG P Log tie in for -15' 8,410.0 8,444.2 22:12 22:24 9/24/2018 9/24/2018 0.30 PR0D1 RPEQPT TRIP P Continue in well, Get to setting depth 8,444.2 8,692.5 22:24 22:42 8692.5, TOWS @ 8682 oriented to high side. Shut EDC. Bring pumps online. See tool shift @ 5100 PSI. DHWOB=4K. Lift off whipstock 9/24/2018 9/25/2018 1.30 PROD1 RPEQPT TRIP P POOH after setting whipstock 8,692.5 78.0 22:42 00:00 9/25/2018 9/25/2018 1.00 PROD? RPEQPT PULD P PJSM, PUD BHA#10 78.0 0.0 00:00 01:00 9/25/2018 9/25/2018 1.10 PROD1 WHPST PULD P PD BHA#11 Window Milling Assembly 0.0 74.0 01:00 02:06 #1 (0.6" AKO motor, string reamer, window mill) 9/25/2018 9/25/2018 1.60 PROD1 WHPST TRIP P RIH w/BHA#11 74.0 8,409.0 02:06 03:42 9/25/2018 9/25/2018 0.30 PROD1 WHPST DLOG P Log K1 for -18' correction, PUW = 8,409.0 8,435.0 03:42 04:00 36K, close EDC, RIW = 18K 9/25/2018 9/25/2018 0.20 PROD? WHPST TRIP P Contiue RIH, dry tag TOWS @ 8681', 8,435.0 8,680.0 04:00 04:12 PUW = 37K, bring up rate, RBIH to begin milling 9125/2018 9/25/2018 2.40 PROD1 WHPST WPST P Milling window, 1.8 bpm, FS = 417 psi, 8,680.0 8,681.5 04:12 06:36 BHP = 4004 psi, WHP = 522 psi, stall getting started @ 8680.4', PU, RBIH & begin time milling 8680.2, WOB = 1.5K, metal over shakers, begin taking slight losses, lower WHP to achieve 1 for 1 returns PU to swap pumps (leaking pop-off), RBIH & continue milling, mill to 8681.5', stall, PUW = 36K, RBIH 9/25/2018 9/25/2018 3.00 PROD1 WHPST WPST P Continue milling from 8681.5', 1.8 8,681.5 8,683.9 06:36 09:36 - bpm, FS = 417 psi, BHP = 3883 psi, WOB = 2K -3K, stall at 8683.9', PUW = 36K, RBIH 9/25/2018 9125/2018 2.90 PROD1 WHPST WPST P Continue milling from 8683.9', 1.8 8,683.9 8,686.2 09:36 12:30 bpm, FS = 420 psi, BHP = 3903 psi, WHIP = 455 psi, CWT = 18K, WOB =.9K, stall at 8684'(2 times) 9/25/2018 9/25/2018 0.60 PROD1 WHPST REAM P Make 3 reaming passes on first 6' of 8,686.2 8,686.2 12:30 13:06 window @ HIS, 1 fpm, PUW = 37K, pump 5x5 sweeps, dry drift up & down, clean 9/25/2018 9125/2018 1.50 PROD1 WHPST TRIP P POOH, open EDC 8,686.2 74.0 13:06 14:36 9/25/2018 9/25/2018 0.80 PROD1 WHPST PULD P PJSM, PUD BHA#11, LD tools, clear 74.0 0.0 14:36 15:24 floor, string reamer & mill both came mill came out 2.80" no-go 9/25/2018 9/25/2018 3.00 PROD1 WHPST WAIT P Wait on Weatherford motor 0.0 0.0 15:24 18:24 9/25/2018 9125/2018 1.80 PROD1 WHPST PULD P 1.25` Fixed motor on location, PJSM, 0.0 77.0 18:24 20:12 PU & PD BHA#12, skid cart, check packoffs - good, tag up, set counters, `• Fat radis speed mill, 2.80" no go, new string mill SN5284634, 2.80" no go 9/25/2018 9/25/2018 1.70 PROD1 WHPST TRIP P RIH W BHA#12, second window 77.0 8,410.0 20:12 21:54 1 milling assembly #2. 9/25/2018 9/2512018 0.20 PROD1 WHPST DLOG P Tie into Kl marker for -17.5' 8,410.0 8,434.2 21:54 22:06 correction. Page 12137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth 1 start Time End rime Dur (hr) Phase Op Cede Adviry Code Time P -T -x Operatlwt (110) End Depth (W) 9/25/2018 9/25/2018 0.50 PRODt WHPST TRIP P PU Wt 36 k lbs, close EDC. Continue 8,434.2 8,687.0 22:06 22:36 to RIH. 9/25/2018 9/26/2018 1.40 PROD1 WHPST WPST P RIH Wt 18k lbs, CT4343 psi @ 1.79 8,687.7 8,688.5 22:36 00:00 bpm, Free spin diff 628 psi, Annular 4018 psi, WH 576 psi, IA 616 psi, OA 174 psi. See WOB @8687.74 OBD per pan, WOB 0.44 k Has, CT Wt 18.82, W013.6 -.2 k lbs 9/26/2018 9/26/2018 0.70 PRODt WHPST WPST P CT 3991 psi @ 1.79 bpm, annular 8,688.5 8,689.2 00:00 00:42 4022 psi, WH 570 psi, OBD CT Wt 19 k lbs, WOB .8 -.2 k lbs -following milling schedule. 9/26/2018 9/26/2018 3.80 PROD1 WHPST WPST P Engage auto drill, CT 3980 psi @ 1.79 8,689.2 8,693.5 00:42 04:30 bpm, annular 4022 psi, WH 573 psi, OBD CT Wt 16.8 k lbs, WOB 0.2 k Ibs- 9/26/2018 9/26/2018 2.50 PROD1 WHPST WPST P CT 4094 psi @ 1.79 bpm, annular 8,693.5 8,706.0 04:30 07:00 4025 psi, WH 580 psi, OBD CT Wt 15.6 k lbs, WOB 2.37 k lbs, WOB fell off @ 8693.5 TD rat -hole at 8706', pump sweeps 9/26/2018 9/26/2018 2.50 PROD1 WHPST REAM P Make reaming passes HS (-90 psi 8,706.0 8,706.0 07:00 09:30 motor work @ 8688' up & down), 30" L, 30"R, & LS, pump sweeps 9/26/2018 9/26/2018 1.80 PROD1 WHPST TRIP P POOH, PUW = 37K, open EDC, PJSM 8,706.0 74.0 09:30 11:18 9/26/2018 9/2612018 1.10 PROD1 WHPST PULD P PUD BHA#12 (crass -training), string 74.0 0.0 11:18 12:24 reamer & mill came out 2.79 no-go 9/262018 9/26/2018 2.10 PROD1 DRILL CIRC P Clear rig floor, MU nozzle, stab on, 0.0 0.0 12:24 14:30 displace coil to fresh water, jet stack, pop off, break off nozzle, pull checks, grease tree, grease bravo & romeo valves, fluid pack 9262018 9/262018 6.50 PROD1 DRILL BOPE P BOPE lest (witness waived by Jeff 0.0 0.0 14:30 21:00 Jones ofAOGCC), test pressure 4900 psi, annular 2500 psi, cycle choke D to hold pressure, upper 2-3/8" rams, fail / pass, needed cycling once, some evidence that the test joint is being wom by the deployment ram slips. ****Start test 14:30 - End 21:00 9/26/2018 926/2018 0.70 PROD1 DRILL BOPE P Skid cart, stab on, test inner reel iron, 0.0 0.0 21:00 21:42 9/26/2018 9/262018 0.80 PROD1 DRILL DISP P Turn reel over to mud unstab 0.0 0.0 21:42 22:30 9/26/2018 9/26/2018 1.20 PROD1 DRILL PULD P PU & PD BHA#13, AL -03 build drilling 0.0 59.0 22:30 23:42 assembly, 1.8' AKO over RR baker bi center, inspect pack offs, tag up, set counters. 9/2612018 9/27/2018 0.30 PROD1 DRILL TRIP P RIH, while swapping coil to new mud 59.0 1,174.0 23:42 00:00 (system #2) exporting returns to the Bgertank. 9/27/2018 927/2018 1.30 PROD1 DRILL TRIP P Continue to RIH, while swapping coil 1,174.0 8,400.0 00:00 01:18 to new mud (system #2) exporting returns to the tiger tank. 9/27/2018 9/272018 0.20 PROD1 DRILL DLOG P Tie into K1 marker for -18.5' 8,400.0 8,417.8 01:18 01:30 1 1 I I correction. 9/27/2018 9/27/2018 0.50 PROD1 DRILL TRIP P Continue to RIH displacing coil to new 8,417.8 8,706.0 01:30 02:00 1 mud, ssytem #2, PU Wt, 35 k lbs, close EDC,continue to RH Page 13137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SWM Depth start Time End Time Our (m) Phase Op Cede Actively Code Time P -T -x operation (K6) End Depth (flka) 9/27/2018 9/27/2018 1.30 FROM DRILL DRLG P RIH Wt 18 k lbs, CT 3802 psi @ 1.79 8,706.0 8,825.0 02:00 03:18 bpm, Free Spin diff. 451 psi, WH 427 psi, IA 614, OA 173. Annular 3988 psi OBD, CT Wt 17 k Ibs,WOB1.7 k lbs, ROP 90 ft/hr Average ROP over interval on bottom 91 ft/hr 9/27/2018 9/27/2018 0.20 PROD1 DRILL WPRT P DD wiper, PU 37 k IDS, Tum around @ 8,825.0 8,825.0 03:18 03:30 8769', RBIH 9/27/2018 9/27/2018 2.30 PRODi DRILL DRLG P RIH Wt 19 k lbs, CT 3682 psi @ 1.80 8,825.0 9,055.0 03:30 05:48 bpm, Free Spin diff. 455 psi, WH 455 psi, annular 4027 psi OBD, CT Wt 17 k Ibs,WOB1.8 k lbs, ROP 100 ft/hr Pumped 5x5 sweep, pulled 100' bha wiper, PU 41 k lbs. Drill to called TD of build @ 9055' 9/27/2018 9/27/2018 2.00 PROD1 DRILL TRIP P Pump sweeps, POOH, PJSM 9,055.0 72.0 05:48 07:48 9/27/2018 9/27/2018 1.20 PROD1 DRILL PULD P PUD BHA#13, bit came out a 1-1 72.0 0.0 07:48 09:00 9/27/2018 9/27/2018 1.20 PROD1 DRILL PULD P PD BHA#14(Agitator, 0.5°AKO 0.0 78.0 09:00 10:12 motor, new P104 bit), slide in cart, check pack -offs, MU to coil, tag up 9/27/2018 9/27/2018 1.50 PROD1 DRILL TRIP T RIH w/ BHA#14, shallow test @ 500', 78.0 78.0 10:12 11:42 1.8 bpm @ dip = 1800 psi, RIH to 600', 1.8 bpm @ dip = 2150 psi (should be -1000 psi) Begin POOH, shut down pumps to close EDC, bore pressure drops (-350 psi dp), bleeder on pump #1 leaking, swap to mud pump #2, appears as though upper checks may not be holding, POOH 9/27/2018 9/27/2018 1.00 PRODi DRILL PULD T PJSM, PUD BHA#14 78.0 0.0 11:42 12:42 9/27/2018 9/27/2018 0.70 FROM DRILL OTHR T Agitator& motor function when blown 0.0 0.0 12:42 13:24 down w/ 120 psi air, MU/PU new Coil Track tools, change out checks in UQC (obvious stop in one check) 9/27/2018 9/27/2018 1.20 FROM DRILL PULD T PD BHA#15 (New CoilTrack new 0.0 78.0 13:24 14:36 agitator, new 0.5° motor, P104 bit), cross -training, slide in cart, MU to coil, tag up, set counters 9/27/2018 9/27/2018 1.60 PROD1 DRILL TRIP P RIH wl BHA#15, shallow test tools @ 78.0 8,400.0 14:36 16:12 515', 1.8 bpm, dp = 900 psi, unload ODS PDL 927/2018 9/27/2018 0.30 PRODi DRILL DLOG P Log K1 for -16' correction, PUW = 8,400.0 8,426.0 16:12 16:30 40K, log RA at 8687.5', TOWS = 8680', PUW = 42K @ 8950' 9/27/2018 9/27/2018 0.40 FROM DRILL TRIP P Cotinue to RIH 8,400.0 9,055.0 16:30 16:54 9/27/2018 9/27/2018 1.30 PROW DRILL DRLG P OBD, RIW = 17K, 1.8 bpm, dip = 960 9,055.0 9,106.0 16:54 18:12 psi, CWT = 15K, WOB = 1.71K, BHP = 3981 psi, WHIP = 368 psi, circ pressure = 4159 psi 9/27/2018 9/27/2018 0.10 PROM DRILL WPRT P PU Wt 45 k IDS, pick up to get 9,106.0 9,106.0 18:12 18:18 1 1 I parameters. RBIH Page 14137 Report Printed: 10115/2018 Summary (with Timelog Depths) 31-01 lipOperations Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Steri Depth Stars Tern End Time Dur (hr) Phase Op Code ACNhF Code Tune P -T -X Operation (MB) End OePth(ftKB) 9/27/2018 9/27/2018 2.00 PRODt DRILL DRLG P RIH Wt 17 k lbs, C14194 psi, @ 1.80 9,106.0 9,305.0 18:18 20:18 bpm, free spin 965 psi,annular 3989 psi, WH 302 psi, IA 630, OA 180. BOBD, CT Wt 15.2 k lbs, WOB 1.04 k Is, ROP 100 ft(hr ROP over interval drilled 99.5 ft/hr 9/27/2018 9/27/2018 0.20 PROD1 DRILL WPRT P PU W139 k lbs, 1 st scheduled wiper 9,305.0 9,305.0 20:18 20:30 after 250'drilled. PU 250' to EOB, RBIH No signs of frac sand in returns. 9/2712018 9/27/2018 2.70 PROD1 DRILL DRLG P Ct 4386 psi, @ 1.80 bpm, free spin 9,305.0 9,570.0 20:30 23:12 990 psi,annular 4091 psi. BOBD, CT Wt 15 k lbs, WOB 1.4 k Is, ROP 140 ft/hr ROP over interval drilled 981t/hr 9465 PU 44 k Ibs No signs of frac sand in returns. 9/27/2018 9/27/2018 0.40 PRODi DRILL WPRT P PU Wt 39 k lbs, 2nd scheduled wiper 9,570.0 8,700.0 23:12 23:36 after 250' drilled. PU 870' No signs of frac sand in returns. 9/272018 9/27/2018 0.10 PROM DRILL DLOG P Log RA for+ 1.5' correction 8,700.0 8,727.1 23:36 23:42 9/27/2018 9/28/2018 0.30 PROD1 DRILL WPRT P RBIH 8,727.1 9,557.0 23:42 00:00 9/28/2018 9/28/2018 0.10 PROD1 DRILL WPRT P RBIH 9,557.0 9,570.0 00:00 00:06 9/2812018 9/282018 2.20 PROD1 DRILL DRLG P Ct psi, @ 1.78 bpm, free spin 897 9,570.0 10,005.0 00:06 02:18 psi,annular 4047 psi. BOBD, CT Wt 10 k lbs, WOB 1.8 k Is, ROP 200 ft/hr ROP over interval drilled 198 ft/hr 9720 PU 40 k lbs - 100' BHA wiper '• 9,711' pinched choke from 12.3+ to 12R ppg 9796', pinched choke to 12.5 ppg No signs of frac sand in returns. 9/28/2018 9/28/2018 0.50 PROM DRILL WPRT P PU, Wt 40k lbs Wiper#1 10,005.0 8,670.0 02:18 02:48 9/28/2018 928/2018 0.40 PRODt DRILL WPRT P Park @8670',-6243.67 TVD. 8,670.0 8,670.0 02:48 03:12 Monitor BHP, Pressure climbed from 4088 psi to 4110 psi - *'•12.66 ppg EMW 9/28/2018 9/282018 0.50 PROD1 DRILL WPRT P RBH, targeting 12.7 ppg EMW @ the 8,670.0 10,005.0 03:12 03:42 window. 928/2018 9/28/2018 1.70 PRODi DRILL DRLG P Ct 4384 psi, @ 1.78 bpm, free spin 10,005.0 10,258.0 03:42 05:24 881 psi, annular 4191 psi, WH 427 psi. OBD, CT Wt 12 k lbs, WOB 2 k lbs, ROP 150 ft/hr PU 40 k lbs. 9/28/2018 9/28/2018 1.00 PROD1 DRILL DRLG P Ct 4384 psi, @ 1.78 bpm, free spin 10,258.0 10,430.0 05:24 06:24 881 psi, annular 4191 psi, WH 427 psi. OBD, CT Wt 12 k Ibs, WOB 2 k Ibs, ROP 150 ft/hr PU 40 k lbs. 9/28/2018 928/2018 0.40 PROM DRILL WPRT P Scheduled wiper#2 up -hole, PUW = 10,430.0 9,579.0 06:24 06:48 39K 9/28/2018 928/2018 0.30 PROD1 DRILL WPRT P Wiperin-hole, RIW=11K 9,679.0 10,430.0 06:48 07:06 Page 15137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Depth Start Time Er1dTma Durrx) Phase Op Code Activity Code Time P-T-X Operation End Depth(Mlt) 9/28/2018 9/28/2018 1.20 PROD1 DRILL DRLG P BOBD, CWT = 9K, WOB = 1.3K, BHP.0 10,598.0 07:06 08:18 = 4276, WHP = 507 psi, 1-for-1 returns @ 1.8 bpm, circ pressure4736 psi, 12.9 ppg at window, CWT rd falling off (snubbing -2K CWT), pump sweeps, ROP = 140 fph 9/28/2018 9/28/2018 1.30 PRODi DRILL DRLG P OBD, BHP = 4350 psi, 1.8 bpm, 1-for-.0 10,850.0 08:18 09:36 1 returns @ 12.9 ppg @ window, WOB = 2K, circ pressure = 4767 psi, pump sweeps Decision made to drop tol2.8 ppg & take manual straps (attempting to confirm reservoir is not charging up) 9/28/2018 9/28/2018 0.80 PROM DRILL WPRT P Wiper, PUW =40K, log RA for+4' 10,850.0 8,668.0 09:36 10:24 1 correction 9/28/2018 9/28/2018 0.50 PROM DRILL CIRC P Circulate bottoms up 8,700.0 8,669.0 10:24 10:54 9/28/2018 9128/2018 0.40 PROM DRILL DLOG P Obtain SBHP: bleed down from 13.0 8,669.0 8,669.0 10:54 11:18 ppg to 12.8 ppg (5 times, shut in, MD = 8669', TVD sensor = 6243', MW-out = 8.75 ppg, Annular = 4221, EMW = 13.0 ppg 9/28/2018 9/28/2018 1.20 PROM DRILL WPRT P Wiper in-hole, CWT weight falling off 8,669.0 10,850.0 11:18 12:30 beginning ^10,200', stacking negative CWT by 10,545' lhm 10,700', pump sweeps Nabors depth counters sticking, dean & spray down, reset depth to current drilled depth of 10,650'+4' correction (10,854) 9/28/2018 9/28/2018 2.00 PROD1 DRILL DRLG P OBD, 1.8 bpm, FS = 841 psi, CWT= 10,850.0 11,111.0 12:30 14:30 12K, WOB = 1 K, BHP = 4344 psi, WHP = 605 psi, pump 5x5 sweeps, BHA wiper, snubbing to get back down, mud system #3 reachest bit at 11,111', PUW = 39K, ROP = 130 fph 9/28/2018 9/28/2018 0.50 PROD1 DRILL DRLG P OBD, CWT =5K, WOB =.6K, BHP= 11,111.0 11,165.0 14:30 15:00 4420 psi, WHP = 656 psi, circ = 4590 psi, 13.0 ppg @ window, 9/28/2018 9/28/2018 0.30 PROM DRILL TRIP P Wiper up-hole, PUW =39K 11,165.0 10,338.0 15:00 15:18 9/28/2018 9128/2018 0.30 PROM DRILL TRIP P Wiper in-hole, RIW = 9K 10,338.0 11,165.0 15:18 15:36 9/28/2018 9/28/2016 1.40 PROD1 DRILL DRLG P OBD, 1.8 bpm, CWT= 3.5K WOB = 11,165.0 11,304.0 15:36 17:00 1.1 K, BHP = 4406 psi, WHP = 674 psi, circ = 4666 psi 9/28/2018 9/28/2018 0.30 PROD1 DRILL WPRT P 250' wiper, PUW = 39 K, RIW = 9K 11,304.0 11,304.0 1700 17:18 9/28/2018 9/28/2018 4.30 PROM DRILL DRLG P CT 4615@ 1.80 bpm, Annular 4449, 11,304.0 11,545.0 17;18 21;36 Free spin 928, WH 624 psi, IA 650, OA 200 OBD, CT WT=-7klbs, WOB 0.8k lbs, ROP - 50 ft/hr Drill with many pick ups, troubles turning around and running past 11,357, pumping sweeps. PU weights consistently 45 k lbs. added 15 Lowtorque to active system, no noticeable change in weight transfer. Average ROP over section = 56 R/hr Page 16/37 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stam Depth start Time End Time Dur (hr) Phase Dp Code Activity Cove Time P.T-x OpersGon (ftKB) End Depth(fiKa) 9/28/2018 9/28/2018 1.10 PROD1 DRILL WPRT P Wiper, PUW =45 K, 11,545.0 8,700.0 21:36 22:42 Pull wiper early, chase 5x5 sweep off bottom, time second 5x5 just prior to entering the build. Hole Clean w/ regard to coil weight. No WOB or motorwork. 9/2812018 928/2018 0.20 PROD1 DRILL DLOG P Tie in toRA tag for +/'correction. 8,700.0 8,726.7 22:42 22:54 9/28/2018 928/2018 0.90 PROD1 DRILL WPRT P RSH, CT Wt started at 17.7 k lbs / 50 8,726.7 11,545.0 22:54 23:48 ft/min and 1 bpm. CT Wt dropped to 8 k reduced RIH sped to 40 ff/min One small stack out 10,628 @ a TF change Clan trip in 9/28/2018 929/2018 0.20 PROM DRILL DRLG P CT46000D 1.80 bpm, Annular 4441, 11,545.0 11,550.0 23:48 00:00 Free spin 912, WH 744 psi, IA 656, OA 205 OBD, CT WT=0klbs, WOB 0.7k lbs, ROP 70 R/hr Average ROP over section = 25 R/hr 9/29/2018 929/2018 1.70 PROM DRILL DRLG P CT 4600@ 1.80 bpm, Annular 4441, 11,550.0 11,584.0 0000 01:42 Free spin 912, WH 744 psi, IA 656, OA 205 OBD, CT WT=-7klbs, WOB 0.7k lbs, ROP 70 ft/hr Observed influx,increased stepwise to 13.3 EMW at the window. Struggling with weight transfer, attempt sweeps, reduced pump rate. Able to make 100-50 R/hr when on bottom but WOB falls off rapidly. Average ROP over section = 20 ft/hr 9/29/2018 9/292018 0.20 PROD1 DRILL WPRT P PU, 40 klbs -200'BHA wiper 11,584.0 11,584.0 01:42 01:54 9292018 9/292018 1.60 PRODt DRILL DRLG P CT 4785 fob 1.80 bpm, Annular 4590, 11,584.0 11,655.0 01:54 03:30 Free spin 889, WH 960 psi OBD, CT WT = -7 k Ibs, WOB 1-.2 k lbs, ROP 100 ft/hr - when on bottom Able to make 100-50 ft/hr when on bottom but WOB falls off rapidly. Add alpine beads to Hi -Ys sweep pump 5x5 Average ROP over section = 44 ft/hr 9/29/2018 9/29/2018 0.90 PROD1 DRILL DRLG P Drilling Break (off 11,660', CT Wt 5.7 k 11,655.0 11,723.0 03:30 04:24 WOB .5 k, ROP 150 - 250 R/hr, short lived Back to multiple pick ups for short footage CT Wt -7 k lbs, WOB 1-.2 k lbs, ROP 50+ while on bottom Average ROP over section = 75 ft/hr 9/29/2018 929/2018 0.20 PROM DRILL WPRT P PU, 40 it lbs - 200' BHA wiper 11,723.0 11,723.0 04:24 04:36 9/29/2018 9/29/2016 0.80 PROD1 DRILL DRLG P CT Wt -7 k lbs, WOB 1-.2 k lbs, ROP 11,723.011,744.0 04:36 0524 50+ while on bottom Pumping beads with little effect on weight transfer Page 17137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log scan naPm sted Time ErdTM our (hr) Phase op Code AcfiWtyCade Tm P -T -X operafim MR) EM Depth(WB) 9/29/2018 9/29/2018 2.40 PROD! DRILL DRLG P OBD, 1.8 bpm, FS = 920 psi, CWT = - 11,744.0 11,863.0 05:24 07:48 5K, WOB = 0.6K, BHP = 4576 psi, WHP = 738 psi, circ = 4900 psi, stuggling w/ weight transfer, pumping beaded sweeps as required, continual PU's to continue drilling Suspect micro -motion out drive gain issues, break down MM out & blow down, lititle to no improvement 9/29/2018 9/29/2018 0.20 PROM DRILL WPRT P 150'wiper, PUW = 37K, RIW = 10K 11,863.0 11,863.0 07:48 08:00 9/29/2018 9/29/2018 1.10 PROD1 DRILL DRLG P OBD, 1.8 bpm, FS = 948 psi, CWT = 11,863.0 11,902.0 08:00 09:06 2K, WOB = 1.2K, BHP = 4531 psi, WHP = 603 psi, circ = 5111 psi, NBI = 97.5°, PUW's = 38K - 43K 9/29/2018 9/29/2018 0.30 PROD1 DRILL WPRT P 200' wiper, PUW = 39K, RIW = 11 K 11,902.0 11,902.0 09:06 09:24 9/29/2018 9/29/2018 0.40 PROD1 DRILL DRLG P OBD, CWT =2K, WOB=.9K, BHP= 11,902.0 11,915.0 09:24 09:48 4516 psi, WHP = 636 psi, circ = 5036 psi, pump 5x5 sweep, difficulty drilling, poor weight transfer 0.30 PRODi DRILL WPRT P 500'wiper, PUVJ=39K, RIW=9K 11,915.0 11,915.0 10:06 9/29/2018 1.40 PROD1 DRILL DRLG P OBD, 1.8 bpm, CWT = 4K (quickly 11,915.0 11,975.0 11:30 falling off), WOB =.9K, BHP = 4525 r218912912018 psi, WHP = 615 psi, circ = 4974 psi, pumping multiple 10 bbl beaded hi -vis pills, drill to 11,975', PUW = 35K 9/29/2018 2.70 PROD! DRILL DRLG P Unsure of TVD in structure, decision 11,975.0 12,088.0 14:12 made to drill past planned TD (11,975), CWT = -4K, WOB = .8K, BHP = 4560 psi,WHP = 523 psi, pumping 10 bbl beaded pills as required, pump 10 x 10 sweeps at called TD of 12,088' 9/29/2018 9/29/2018 2.80 PROM DRILL WPRT P Wait for sweeps to exit bit, wiper to 12,088.0 78.0 14:12 17:00 swab, PUW = 36K, tag up 9/29/2018 9/29/2018 1.70 PROD1 DRILL TRIP P RBIH 78.0 8,400.0 17:00 18:42 9/29/2018 9/29/2018 0.20 PROD1 DRILL DLOG P Tie into the K1 marker for a -14.5' 8,400.0 8,433.5 18:42 18:54 correction 929/2018 912912018 0.80 PROD1 DRILL TRIP P RIH to 8650'. Park and observe BHP 8,433.5 8,651.6 18:54 19:42 build to 13.52 psi TVD 6229.76', Trap 4306 psi @ 18:56 10 min, 4356 psi, - 13.44 ppg 20 min, 4366.7 psi, 13.47 ppg 30 min, 4374.3 psi, 13.50 ppg 40 min, 4381.3 psi, 13.52 ppg RIH after 47 min, 4381.3 psi, 13.52 PPG 9/29/2018 929/2018P1.40 PROD1 DRILL TRIP P Continue to RIH, tag bottom @ 8,651.6 12,090.0 19:42 21:06 12090'. Targeting 13.7 9/29/2018 9/29/2018 PROD1 DRILL DISP P Pump 49.5 bbls liner running pill to the 12,090.0 12,087.0 21:06 21:30 bit, 929/2018 929/2018 PROD1 DRILL DISP P PU 35 k lbs, POOH laying in liner 12,087.0 8,629.0 21:30 22:48 running pill, new mud W/2&2% lubes plus 2 ppb Alpine beads. Paint Yellow TD flag @ 10467.94' Pull through window, clean Page 18137 ReportPrinted: 10115/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth SW Time End Time our (hr) Phase Op Code Actively Code Time P-T-X Operation (flKe) End Deph(RKB) 9/2912018 9/30/2018 1.20 PROM DRILL TRIP P Continue out of hole, 8,629.0 2,287.0 22:48 00:00 ""TOL running pill 8,100' Paint White window flag @ 6978.30' Continue to POOH, slow pulling speed to 35 fi/min passing Orbit valve @ 1.75 bpm, spinning the bit, up down , up passes, continue out of hole. 9/30/2018 9/30/2018 0.40 PROD1 DRILL TRIP P Continue out of hole. Park, SID 2,287.0 399.0 00:00 00:24 pumps, trap pressure, WH @1895 psi, Fell to 1572 psi. 9/30/2018 9/30/2018 0.70 PRODI DRILL TRIP P Shut Orbit valve, bleed wellhead to 399.0 93.0 00:24 01:06 zero, continued out of hole, bleed down at the stack, bleed pressure at the pumps, OWFF while PJSM. 9/30/2018 9/30/2018 1.50 COMPZI DRILL PULD P Pop off, inspect pipe, minor flat spot- 93.0 0.0 01:06 02:36 8' back from CC, 0.168", measure 4 way as prescribed at 12' back from the connector. All 0.203". LD BHA# 15 over a closed orbit valve. Inspect and torque reel / saddle clamp bolts. Blow down and snake Out MM. 9/30/2018 9/30/2018 0.60 COMPZI CASING PUTB P Clear/ clean dg floor, prep liner 93.0 0.0 02:36 03:12 running equipment. PJSM 9/30/2018 9/30/2018 2.30 COMM CASING PUTB P PU iL-03 lower completion, run #1. 0.0 1,650.0 03:12 05:30 54 joints 4.6 Ib/ft slotted ST-L liner over a non-ported bull nose topped with a shorty deployment sleeve, LOA (1651.20') Had to fight the drift through joint #3. Vacuuming down stack as it fills, verifying no flow from well. Notice leak from drawworks platform, inspect, call kick while running liner drill. AAR - 32 joints in the hole - 9/30/2018 9/30/2016 0.40 COMPZI CASING RGRP P Sit on safety joint staged in hole. 0.0 960.0 05:30 05:54 Waiting on mechanic who's behind les rig move, to inspect hydraulic leak 9/30/2018 9/30/2018 1.60 COMPZI CASING PUTB P Crew change, continue PU liner (w/ 32 960.0 1,650.0 05:54 07:30 in the hole), clear floor 9/30/2018 9/30/2018 0.70 COMPZt CASING PULD P PU liner running tools, BHA#16, skid 1,650.0 1,695.0 07:30 08:12 in cart, MU to coil, tag up, set counters, equalize above orbit valve (1600 psi), open orbit valve (7th cycle) 9/30/2018 9/30/2018 2.70 COMPZI CASING RUNL P RIH w/ liner run #1, clean past orbit 1,695.0 12,090.0 08:12 10:54 valve, -18.1 correction to window flag, log K1 for 0' correction, 39K PUW @ window, arrive at TD, PUW = 41 K, RBIH, bring up pumps, release off liner, PUW = 33K, TOL -10,439' 9/30/2018 9/30/2018 2.70 COMPZI CASING TRIP P POOH, pumpng across the top until 12,090.0 44.0 10:54 13:36 window (to not displace LRP), pump down coil once through the window, paint EDP flags, close orbit valve & bleed off WHP (13.6 ppg shedule gives-1600 psi WHIP), open EDC 9/30/2018 9/30/2018 0.40 COMPZI CASING PULD P PJSM„floes-check well, good, LD BHA 44.0 0.0 13:36 14:00 #16 9/30/2018 9/30/2018 0.90 COMPZI CASING PUTB P PU liner (Ported BN, 16 jnts slotted 0.0 475.0 14:00 14:54 1 1 1 1 liner, OH anchor & billet) 9/30/2018 9/30/2018 0.80 COMPZI CASING PULD P PU liner running tools, BHA#17, slide 14:54 15:42 in cart, MU to coil, tag up, set counters, equalize above orbit valve, 7r7 open orbit valve (cycle #8) Page 19137 ReportPrinted: 1011512018 Summary (with Timelog Depths) 31-01 lipOperations Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log S an Depth Start Time EMTme Dur(hr) Phase Op CMe ACWHY CMa Tma P-T-x Operation (fti(a) EM Depth We) 9/30/2018 9/30/2018 1.50 COMPZ1 CASING RUNL P RIHw/BHA#171inermn#2, pre-load 550.0 8,535.0 15:42 17:12 DS PDL, correct to window flag for a - 20.7', PUW = 32K, Gose EDC 9/30/2018 9/30/2018 0.80 COMPZ1 CASING RUNL P Continue to RIH, drive by Log K1 for 8,535.0 10,431.0 17:12 18:00 zero correction. Set on depth, slips oriented 180 ° ROHS. "'TOL 9950' 9/30/2018 9/30/2018 2.20 COMPZ1 CASING TRIP P POOH 10,431.0 41.0 18:00 20:12 9/30/2018 9/30/2018 1.30 COMPZ1 CASING PULD P Bump up, space out, PUD, BHA# 17, 41.0 0.0 20:12 21:30 1 LD same. 9/30/2018 9/30/2018 0.70 PROD2 STK BOPE P Perform BOP function test. 0.0 0.0 21:30 22:12 9/30/2018 10/1/2018 1.80 PROW STK CTOP P Cut back coil to remove flat spot. Re- 0.0 0.0 22:12 00:00 install coil connector, pull test to 3.5 k lbs ""Cut 19' of coil 10/1/2018 10/1/2018 2.00 PROD2 STK CTOP P Cut one more foot of coil, reinstall CC, 0.0 0.0 00:00 02:00 pull test to 3.5 k lbs, Rehead, test wire, good, 61.4 / 1400 ohms, PT to 4000 psi. Bleed down. " cut 1' foot of coil. 10/1/2018 10/1/2018 1.40 PROW STK PULD P PU & PD BHA#18, Li-04 lateral 0.0 75.0 02:00 03:24 drilling assembly, skid cart, stab on, check and replace pack offs, bump up, set counters, 10/1/2018 10/1/2018 1.70 PROD2 STK TRIP P RIH W BHA#18 75.0 8,400.0 03:24 05:06 Shallow test agitator, continue to RIH. rale(bpm) Diff press(psi) 1.0 165 1.5 825 2.0 1178 10/1/2018 10/1/2018 0.20 PROD2 STK DLOG P Tie into the K1 marker for -20' 8,400.0 8,432.7 05:06 05:18 correction 10/1/2018 10/1/2018 1.00 PROD2 STK TRIP P Continue to RIH, dry tag TOB @ 9948, 8,432.7 9,947.8 05:18 06:18 PUH, bring up rate, RBIH, observe 1726 psi dp over tools @ 1.7 bpm, dp drops to expected levels (-1300 psi FS) 10/1/2018 10/1/2018 1.20 PROD2 STK KOST P Begin milling off billet, oriented 210° 9,947.8 9,948.8 0618 07:30 ROHS, 1 fph for 1', stall getting started, PUW = 38K, stall second time getting started FS = 1169 psi @ 1.7 bpm, BHP = 4526 psi, WHP = 823 psi, WT = 15K, WOB fell off, no motorwork, contiunue w/ shedule 10/1/2018 10/1/2018 0.50 PROD2 STK KOST P 2 fph for 1', little to no WOB, CWT 9,948.8 9,949.8 07:30 08:00 stacking ( from -14.5K to 7.5K over first 1') continue with schedule 10/1/2018 10/1/2018 0.30 PROW STK KOST P 3 fph for 1', CWT=-5.3K, WOB 9,949.8 9,950.0 08:00 08:18 = .03K, contnue stacking CWT to 2.6K, CWT lets go, stall 9950.3', PUW = 38K, observiing no aluminum over shakers 1011/2018 10/1/2018 0.90 PROD2 STK KOST P PUH, pump sweeps, RBIH to verify 9,950.0 9,947.6 08:18 09:12 depth, FS = 1070 psi, ease in tenths to find WOB, see weight @ 9948.6', stall, PUW = 42K, continue working to get started on billet, stall @ 9947.6' Page 20137 ReportPrinted: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stance" Starr Time I End Time our (hr) Phase Op Code Aawty Code Ime P -T -X Operation (ftKB) End OepM MKB) 10/112018 10/1/2018 2.00 PROD2 STK TRIP T Confer w/ town POOH to PU NOV 9,947.6 78.0 09:12 11:12 agitator atop same Iron Horse motor, open EDC 10/1/2018 10/1/2018 1.20 PROD2 STK TO -LD T PJSM, PUD BHA#18 (cross -training), 78.0 0.0 11:12 12:24 pull motor, break off bit, blow down with air, motor appears functional 10/1/2018 10/1/2018 1.10 PROD2 STK PULD T Begin PD BHA#19 L1-04 KO/Lat 0.0 0.0 12:24 13:30 Assembly (NOV agitator, 0,5` AKO Iron Side motor, RB P104 bit), bit came out a 1-2 (1 chipped reamer cutter & 2 plugged nozzles), observe rubber plugging nozzle, decisioin made to stop PD, pull motor OOH, PUD BHA#19 Confer w/ town decison made to PU 55 hr X-Treme motor & 55 hr agitator (tools from L1-03 lateral) 10/112018 1.50 PROD2 STK PULD T PD BHA#19 (NOV agitator, 0.5° AKO 0.0 78.0 13:30 15:00 X-Treme motor, RB P104 bit), slide in 110/1/2018 cart, MU coil, check pack -offs, tag up, Pet counters 10/1/2018 10/1/2018 1.80 PROD2 STK TRIP T RIH w/BHA#19, shallow test at 517', 78.0 8,400.0 15:00 16:48 1.8 bpm, FS = 943 psi, good vibration, captured screens shots of transducer output, FS = 943 psi, bore = 2411 psi, circ = 4937 psi Perform multiple tests to aquire agitator data via Baker transducer (Results on S: drive under photographs for 31-01), EDC closed 10/1/2018 0.10 PROD2 STK DLOG T Log Kt for -20' correction 8,400.0 8,423.0 16:54 10/1/2018 1.10 PROD2 STK TRIP T Continue RIH, PUW = 40K @ window, 8,423.0 9,946.4 18:00 counters not in agreement, r16:54 troubleshoot, set down @ 8693', dry tag TOB at 9949.8' 10/172018 0.90 PROD2 STK KOST P Milling off billet, 1 fph for 1'm, CWT 9,9484 9,949.4 18:54 =15.7K, WOB on falls off 10/1/2018 0.50 PROD2 STK KOST P Go to 2 fph for 1' 9,949.4 9,950.4 18:54 19:24 10/1/2018 10/1/2018 0.30 PROD2 STK KOST P Go to 3 fph for V 9,950.4 9,951.4 19:24 19:42 10/1/2018 10/1/2018 1.00 PROD2 STK KOST P Control drill 3-10 fph until 10' in (past 9,951.4 9,961.4 19:42 20:42 1 slips) per DD 10/1/2018 10/1/2018 1.30 PROD2 DRILL DRLG P Off billet drilling ahead, 1.8 bpm, CWT 9,961.4 10,151.0 20:42 22:00 = 13K, WOB = 1.4K, BHP = 4613 psi, WHP = 788 psi, circ = 5502 psi 10/1/2018 10/1/2018 0.50 PROD2 DRILL WPRT P PUW = 39K, dry drift billet area up & 10,151.0 10,151.0 22:00 22:30 down, clean Capture off bottom screens of agitator frequency at 1.65 & 1.9 bpm (70 & 80 gpm) 10/112018 10/1/2018 1.30 PROD2 DRILL DRLG P OBD, 1.8 bpm, FS = 1000 psi, CWT = 10,151.0 10,350.0 22:30 23:48 13k, WOB = 1.3K, BHP = 4591 psi, WHP = 758 psi, pumps sweeps, ROP = 153 fph 10/1/2018 10/2/2018 0.20 PROD2 DRILL WPRT P PU 40 k lbs, wiper trip number 1 10,350.0 9,750.0 23:48 00:00 10/2/2018 10/2/2018 0.10 PROD2 DRILL WPRT P Continue wiper up -hole - Wiper #1 9,750.0 9,552.0 00:00 00:06 Page 21137 ReportPrinted: 10/1572018 Operations Summary (with Timelog Depths) 31-01 R ♦ Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SW Depth Start Time End Time Dur(hr) Phase up Code Activity Code Time P -T -X operation (NCB) EM Depth (W.13) 10/2/2018 10/212018 0.30 PROD2 DRILL WPRT P RBIH - RIHWt 14 k lbs 9,552.0 10,350.0 00:06 00:24 10/2/2018 10/2/2018 2.10 PROD2 DRILL DRLG P CT 5314 psi @ 1.80 bpm, Annular 10,350.0 10,750.0 00:24 02:30 4599 psi, Free spin 934 psi, WH 700 psi. IA649 psi, OA 197 psi. OBD, CT Wt 4 k lbs, WOB 2.2 k Ibs, ROP 190 Whir 10,572 PU 40 k Itis 10,573' PU 41 k Itis 10,684 PU 47k lbs - let drill off to rotate TF, sat to log Targeting 13.7 ppg @ the window, setting 13.8 pg - pushing away 2.5 bbls per hr. Average ROP over interval - 190 It/hr 10/2/2018 10/2/2018 0.20 PROD2 DRILL WPRT P PU 42 k lbs, wiper #2 10,750.0 9,975.0 02:30 02:42 32 k lbs, dean pulling, good hole 10/2/2018 10/22018 0.20 PROD2 DRILL WPRT P RBIH - RIHWt 12 k Ibs - clean 9,975.0 10,750.0 02:42 02:54 10/2/2018 10/2/2018 3.50 PROD2 DRILL DRLG P CT 5284 psi @ 1.79 bpm, Annular 10,750.0 11,151.0 02:54 06:24 4712 psi, Free spin 880 psi, WH 723 psi. OBD, CT Wt 7 k lbs, WOB 1.5 k lbs, ROP 1901Uhr 10,990 PU 42 k lbs - PU as 5x5 exited midway to scheduled wiper Average ROP over interval - 114 ft/hr 102/2018 10/212018 0.90 PROD2 DRILL WPRT P PU 41 k Ibs, wiper #3 to the window 10,750.0 8,700.0 06:24 07:18 for tie in 35-32 k lbs, clean pulling, good hole Billet clean 1022018 10/2/2018 0.10 PROD2 DRILL DLOG P Tie into the RA tag for a +4' correction 8,700.0 8,725.0 07:18 07:24 10/22018 10/22018 0.80 PROD2 DRILL WPRT P RBIH 8,725.0 11,151.0 07:24 08:12 Billet clean 10/22018 10/22018 3.90 PROD2 DRILL DRLG P CT 5300 psi @ 1.80 bpm, Annular 11,151.0 11,430.0 08:12 12:06 4689 psi, Free spin 872 psi, WH 692 psi. OBD, CT Wt k lbs, WOB 1.9 k lbs, ROP 120 Whir PU 11302' 38k Itis Start mud swap to system # 4 PU 11389'44 Ibs, 47k, & 47k, in something hard, pulled 200' for restart, running out of push. New mud going down hole @12:07 and 11430' targeting 13.7 ppg a the window, holding 13.6 ppg, pushing away -1.5 Whir Average ROP over interval - 71 Whir 10/212018 102/2018 0.30 PROD2 DRILL WPRT P PU 45 k Itis, early wiper # 1 - 500' 11,430.0 10,930.0 12:06 12:24 1 I I 10/212018 10/22018 0.20 PROD2 DRILL WPRT P RBIH 10,930.0 11,430.0 12:24 12:36 1 I Pumping new mud 1 Page 22/37 ReportPrinted: 1 011 512 01 8 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan DepM Stan Time End rime our (hr) Phase Op Code Activity Code Time P -T -x Operation (flKB) End DepM (ftKe) 10/2/2018 10/2/2018 3.00 PROD2 DRILL DRLG P CT 4946 psi @ 1.79 bpm, annular 11,430.0 11,605.0 12:36 15:36 4738 psi, Free spin 894 psi, WH 751 psi. OBD, CT Wt 2 k lbs, WOB 1.8 k lbs, ROP 150 ft/hr PU 11510' 40 k lbs "' New mud at the bit 11430'. Stmgle to drill, pump 10x10 lube pill 1&1% 776 ans low torque, drilling break then fall off as sweep came out backside. Added 1 % low torque to active. Good effect. targeting 13.7 ppg a the window, holding 13.6 ppg, pushing away -1.5 bbVhr Average ROP over interval -58 ft/hr 10/2/2018 10/2/2018 1.80 PROD2 DRILL DRLG P OBD, CT Wt 1 k lbs, WOB 1.7 k lbs, 11,605.0 11,745.0 15:36 17:24 ROP 150 ft/hr PU 11676' 47 k lbs targeting 13.7 ppg a the window, holding 13.6 ppg, pushing away -1.5 bbl 10/2/2018 10/2/2018 2.00 PROD2 DRILL DRLG P OBD, 1.78 bpm at 5,056 FS, Diff -910 11,745.0 11,810.0 17:24 19:24 psi, WHP=810, BHP=4,725, IA=652, OA=201 10/2/2018 10/2/2018 0.30 PROD2 DRILL WPRT P Wiper up hole (11,000) 11,810.0 10,810.0 19:24 19:42 10/2/2018 10/2/2018 0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW=9.0 k 10,810.0 11,810.0 19:42 20:00 10/2/2018 10/2/2018 1.70 PROD2 DRILL DRLG P BOBD, 1.78 bpm at 5,056 FS, 11,810.0 11,924.0 20:00 21:42 Diff=910, WHP=823, BHP=4,731, IA=652, OA=201 10/2/2018 10/2/2018 0.20 PROD2 DRILL WPRT P Wiper up hole (200'), struggling with 11,924.0 11,724.0 21:42 21:54 weight transfer 10/212018 10/2/2018 0.20 PROD2 DRILL WPRT P Wiper back in hole, RIW=9.0 k 11,724.0 11,924.0 21:54 22:08 10/212018 10/3/2018 1.90 PROD2 DRILL DRLG P BOBD, 1.78 bpm at 5,056 FS, 11,924.0 12,027.0 22:06 00:00 Di"- 10, WHP=823, BHP=4,731, IA=652, OA=201 - Note: Add beads to high vis pit, drill ahead pumping 10 bbl beaded sweeps. 10/3/2018 10/3/2018 3.00 PROD2 DRILL DRLG P OBD, 1.77 bpm at 5,169 psi FS, 12,027.0 12,130.0 00:00 03:00 Diff --875 psi, WHP=730, BHP=4,759, IA=656, OA=205 "` Note: Pumping 1 0x1 0 beaded sweeps 10/3/2018 10/3/2018 3.30 FROM DRILL WPRT P TD lateral, PUW 40.0 k, pump wiper to 12,130.0 50.0 03:00 06:18 1 1 the window chasing 10x10 sweep 10/3/2018 10/3/2018 1.50 PROD2 DRILL TRIP P Bump up, set counters, RBIH. 50.0 8,400.0 06:18 07:48 10/3/2018 10/3/2018 0.30 PROD2 DRILL DLOG P Tie mo to K1 for a -21' correction. 8,400.0 8,426.2 07:48 08:06 1 I 1 Page 23137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Siert Depth Stan Time End Time our(hr) Phase Op Code Activity Code Time P -T -X operation (W11) End Depth(flKB) 10/3/2018 10/3/2018 0.40 PROD2 DRILL TRIP P PU 36 k lbs, RIH and park at 8670' 8,426.2 8,670.0 08:06 08:30 CTMD, 6243.42 TVD, measure bottom hole pressure. Trap 4430.7 psi, observe pressure bleed to 4424.1 - 13.65 to 13.62 ppg EMW Open choke and bleed annular to 4365.3 psi - 13.45 ppg EWM time(mm) press (psi) EMW (ppg) 5 4414 13.6 10 4415 13.6 15 4419 13.6 10/3/2018 10/3/2018 1.50 PROD2 DRILL TRIP P Continue to RIH, Window and billet 8,670.0 12,133.0 08:30 10:00 both clean CT Wt 17k @ 50 ft/min, weight fell off below 11,400' reduced RIH speed Send liner running pill Reduced RIH speed to 16 ft/min and utalized beaded Inerr running pill to reach bottom. 10/3/2018 10/3/2018 3.20 PROD2 DRILL TRIP P Pu 38 k lbs, POOH painting flags and 12,133.0 62.0 10:00 13:12 laying in liner running pills. Yellow TD flag - 10863.53' White window flag 7278.29' "'top of liner running pill 7900' Park @ 3492', Gose Orbit valve, bleed down. Continue out of hole 10/3/2018 10/3/2018 1.30 PROD2 DRILL PULD P Flow check while holding PJSM. 62.0 0.0 13:12 14:30 Inspect pipe, Found gouges in pipe from gripper block, appears to be from bump up @ 6:16 am 10/3/18. Measured pipe at 12' back from coil connecter, 0.210" DS, 0.210 DS, 0.199 reel side, 0.219 Wall side. LD BHA#20 over a closed orbit valve. 10/3/2018 10/3/2018 0.30 COMPZ2 CASING PUTB P Clean and prep floor to run liner 0.0 0.0 14:30 14:46 10/3/2016 10/3/2018 0.50 COMPZ2 CASING PUTB P PU/MU L1-04 completion, run #1, 42 0.0 510.0 14:48 15:18 joints 2-3/8" STL 4.6#/ft slotted liner over a no -ported bull nose and under a shorty deployment sleeve. 10/3/2018 10/3/2018 1.00 COMPZ2 CASING PUTS P @ 17 joints away. Alerted to diesel 510.0 510.0 15:18 16:18 spill at front of rig. Picked up safety joint then floor crew responded to the diesel spill. 10/3/2018 10/3/2018 1.20 COMPZ2 CASING PUTS P continue to PU/MU Ll -04 completion, 510.0 1,297.0 16:18 17:30 run #1, 42 joints 2-3/8" STL 4.6#/ft slotted liner over a no -ported bull nose and under a shorty deployment sleeve. 10/3/2018 10/3/2018 1.00 COMPZ2 CASING PULD P PU BHA 1,297.0 1,343.0 17:30 18:30 10/3/2018 10/3/2018 0.50 COMPZ2 CASING PULD P Check pac-offs (good), change out 1,343.0 1,343.0 18:30 19:00 UOC float valves 10/3/2018 10/3/2018 1.50 COMPZ2 CASING RUNL P RIH with AL -04 first liner segment 1,343.0 8,543.0 19:00 20:30 10/3/2018 10/3/2018 0.15 COMPZ2 CASING RUNL P Correct to the EDP flag correction of 8,543.0 8,543.0 20:30 20:39 Minus 25.12' 10/3/2016 10/3/2018 0.50 COMPZ2 CASING RUNL P Continue RIH 8,543.0 9,675.0 20:39 21:09 10/3/2018 10/3/2018 0.20 COMPZ2 CASING RUNL P Log the K1 correction plus 4.5', PUW 9,675.0 9,675.0 21:09 21:21 1 41 k Page 24137 Report Printed: 1 0/1 512 01 8 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Lag Start Depth startTime EM Time Dur(hn Phase Op Code Activity Cote Time P -T -X operation (nKB) End Depth (MR) 10/3/2018 10/3/2018 0.60 COMPZ2 CASING RUNL P Continue IH 9,675.0 12,133.0 21:21 21:57 1013/2018 10/3/2018 0.30 COMPZ2 CASING RUNL P Set down 3.0 k, bring pump online, 12,133.0 10,822.6 21:57 22:15 1.25 bpm in and 1.25 bpm out, (592 psi/diff), PUW 36 k, remove liner length from counters, - Note: Pushed away 6 bbls on trip in the hole. 10/312018 101412018 1.75 COMM CASING TRIP P Lined up across the lop, PUH to 10,822.6 4,232.0 22:15 00:00 7,900'. line back up down the coil, continue POOH 10/4/2018 10/412018 0.75 COMM CASING TRIP P Continue POOH 4,232.0 44-2- 00:00 00:45 10/4/2016 10/4/2018 0.20 COMPZ2 CASING TRIP P Function dosed Orbit valve (1,600 psi 44.2 44.2 00:45 00:57 below) 10/4/2018 101412018 0.25 COMPZ2 CASING OWFF P Check well for flow (no -flow) 44.2 44.2 00:57 01:12 1014/2018 1014/2018 0.30 COMPZ2 CASING PULD T LD setting tools, found liner at surface. 44.2 0.0 01:12 01:30 1014/2018 1014/2018 0.20 COMPZ2 CASING PULD T Stand back CoilTrak tools, Break off 0.0 0.0 01:30 01:42 and inspect GS (good) 1014/2018 1014/2018 0.25 COMM CASING PULD T MU setting tools 0.0 1,343.0 01:42 01:57 1014/2018 10/4/2018 1.50 COMM CASING RUNL T RIH, with lower liner segment take#2 1,343.0 8,542.0 01:57 03:27 10/4/2018 10/4/2018 0.15 COMM CASING RUNL T Correct to the EOP flag (minus 24.8'), 8,542.0 8,542.0 03:27 03:36 PUW 40 k 1014/2018 10/4/2018 0.38 COMPZ2 CASING RUNL T Continue IH 8,542.0 9,672.0 03:36 03:58 10/4/2018 10/4/2018 0.15 COMPZ2 CASING RUNL T Log the Kt marker correction (plus 9,672.0 9,707.0 03:58 04:07 4.0) 10/4/2018 10/4/2018 0.75 COMPZ2 CASING RUNL T Continue IH 9,707.0 12,133.0 04:07 04:52 10/4/2018 10/4/2018 0.20 COMPZ2 CASING RUNL T Set down 3.7 k DHWOB, PUW 41 k, 12,133.0 10,810.0 04:52 05:04 set back down 3.78 k COMB, bring pump online, 1.39 bpm (891 psi/diff), PUW 35 k, minus 1.0 k, remove liner length from counters, *** Note: Pushed away 6 bbls on trip in the hole. 10/4/2018 10/4/2018 2.30 COMM CASING TRIP P POOH, @ surface, 15134 psi WH 10,810.0 52.0 05:04 07:22 prior to closing the orbit valve star of 10th cycle, PJSM. 10/4/2018 10/4/2018 0.40 COMPZ2 CASING PULD P Flow check, unstab injector, LD BHA# 52.0 0.0 07:22 07:46 21 1014/2018 10/4/2018 0.30 COMPZ2 CASING PUTB P Clear floor and prep for Tuning liner 0.0 0.0 07:46 08:04 10/4/2018 10/4/2018 2.00 COMM CASING PUTB P Pick up upper L1-03 completion 0.0 1,500.3 08:04 10:04 ( run#2), 48 joints under an alminum liner top billet, LOA 1500.25'. 10/4/2018 10/4/2018 0.50 COMM CASING PULD P PU BA#22, stab on, bump up and set 1,500.3 1,544.5 10:04 10:34 counters. equalize to 1673 psi, Open Orbit valve, Cycle #10, 10/4/2018 10/4/2018 1.00 COMPZ2 CASING RUNL P RIH 1,544.5 7,775.0 10:34 11:34 10/4/2018 10/4/2018 0.20 COMPZ2 CASING CLOG P Large tie in at window flag, -57.5'. 7,775.0 7,775.0 11:34 11:46 Inspect counters, clean, arbitrarily correct to -20' as per typical and roll in hole. Page 25137 Report Printed: 10/1512018, ® -- Operations Summary (with Timelog Depths) 31-01 • w Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan DepM I stall Time End Time Dur (h) Phaso Op Code Acd ity Code Time P -T -X Operation (ftKB) End DepM (XKB) 10/412018 1014/2018 0.60 COMM CASING RUNL P Continue to RIH. 7,775.0 9,885.0 11:46 12:22 PU Wt 36 k @ 8640- 101412018 10/4/2018 0.10 COMPZ2 CASING DLOG P Tie into Kt for 0' correction. 9,885.0 9,910.6- 12:22 12:28 10/412018 10/4/2018 0.40 COMPZ2 CASING RUNL P Continue to RIH, tag up, 10834, SID 9,910.0 10,834.0 12:26 12:52 3.6 k lbs, PU 43 k lbs, - 6.8 k Ib WOB, RBIH, SID 3.8 k lbs, Onlne w pump, 1.63 bpm, 901 psi,diff, PU 34 k lbs & - 1.54 k lbs WOB ***Set liner on depth TOB @ 9334', reset counters. 10/4/2018 101412018 1.90 COMM CASING TRIP P POOH, park @ 500', open EDC. 10,834.0 23.7 12:52 14:46 Continue to POOH. - 10/4/2018 101412018 1.00 COMM CASING TRIP P At surface, bump up, speace out, WH 23.7 0.0 14:46 15:46 1590 psi, A 622 psi, OA 186 psi. PUD BHA#22. 10/412018 10/4/2018 1.22 PRODS STK CTOP P Pipe management, Open hot work 0.0 0.0 15:46 17:00 permit, remove upper quick, boot wire, install nozzle, pump slack back, un stab, rig up hydraulic cutter, 10/4/2018 10/4/2018 2.00 PRODS STK CTOP P Trim coil finding wire @ 18', continue 0.0 0.0 17:00 19:00 trimming coil 500' ••• 13,240' Coil Length...... 10/4/2018 1014/2018 0.30 PROD3 STK CTOP P Install CTC, pull test 35 k 0.0 0.0 19:00 19:16 10/4/2018 10/412018 0.50 PRODS STK CTOP P Re -head BHI upper quick, 0.0 0.0 19:18 19:48 >2000/58mohms, PT 4,000 psi (good - test) 10/4/2018 10/4/2018 0.50 PRODS STK CTOP P Stab INJH, pump slack forward 0.0 0.0 19:48 20:18 10/412018 1014/2018 1.00 PRODS STK PULD P Break off INJH, PU/PD kickoff/drilling 0.0 78.3 20:18 21:18 BHA#23 10/4/2018 10/412018 0.40 PRODS STK PULD P Surface test Coiltrak tools (good -test), 78.3 78.3 21:18 21:42 tag up reset counters, bring WHIP upto 1,700 psi, function open the orbit valve. 10/4/2018 101412018 1.75 PRODS STK TRIP P RIH 78.3 8,400.0 21:42 23:27 10/4/2018 10/4/2018 0.20 PRODS STK DLOG P Log the Kt correction minus 20.5' 8,400.0 6,442.0 23:27 23:39 10/4/2018 10/5/2018 0.35 PRODS STK TRIP P Continue IH 8,442.0 9,311.0 23:39 00:00 10/5/2018 10/5/2018 0.10 PRODS STK TRIP P Continue IH, shutdown pump, dry tag 9,311.0 9,330.0 00:00 00:06 TOB @ 9,330', PUW 36 k 10/5/2018 10/5/2018 0.15 PRODS STK TRIP P PUH, bring pump online, obtain 9,330.0 9,328.4 00:06 00:15 parameters, 1.78 bpm at5,442 psi FS, Diff -1,412, WHP=770, BHP=4,619 1015/2018 10/5/2018 0.75 PRODS STK KOST P Kick off billet as per RP @ 1 fph 9,328.4 9,329.4 00:15 01:00 10/5/2018 10/5/2018 0.50 PROD3 STK KOST P Increase ROP to 2 fph 9,329.4 9,330.1 01:00 01:30 10/5/2018 10/5/2018 0.50 PRODS STK KOST P Increase ROP to 3 fph 9,330.1 9,331.0 01:30 02:00 10/512018 10/5/2018 0.35 PRODS STK KOST P Increase 7-10 fph targeting 1.0 k 9,331.0 9,339.0 02:00 02:21 DHWOB 10/5/2018 101512018 1.00 PRODS DRILL DRLG P Drill ahead, 1.80 bpm at 5,816 psi, 9,339.0 9,491.0 02:21 03:21 WHP=434, BHP=4,572, IA=639, OA=190 10/5/2018 1015/2018 0.15 PRODS DRILL WPRT P PUH for dry drift KOP, slight bobble 9,491.0 9,300.0 03:21 03:30 (200 lbs) Page 26137 ReportPrinted: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Si T{me End Tune Dur(hr) Phase Op Core A WyCode Time P -T -x Operation (NCB) EM Depth(ftKB) 10/5/2018 1015/2018 0.15 PRODS DRILL WPRT P RBIH, past KOP (dean) 9,300.0 9,458.0 03:30 03:39 10/5/2018 10/5/2018 0.15 PRODS DRILL WPRT P Perform Check shot @ 9,458' 9,458.0 9,458.0 03:39 03:48 10/5/2018 10/5/2018 0.15 PRODS DRILL WPRT P Continue IH, Perform check shot 9,458.0 9,488.0 03:48 03:57 10/5/2018 10/5/2018 1.60 PRODS DRILL DRLG P BOBD, 1.60 bpm at 5,454 psi FS, 9,488.0 9,735.0 03:57 05:33 Diff=1399, WHP=623, BHP=4,600, IA=640, OA=192, pump 5X5 sweep, timed out with pending wiper. 10/5/2018 10/5/2018 0.20 PROD3 DRILL WPRT P PU Wt 38 k Itis, wiper#1 -400' 9,735.0 9,364.0 05:33 05:45 10/5/2018 10/5/2018 0.20 PROD3 DRILL WPRT P RBIH from wiper#1 9,364.0 9,735.0 05:45 05:57 1015/2018 10/5/2018 1.00 PRODS DRILL DRLG P CT 5302 psi @ 1.81 bpm, Annular 9,735.0 9,859.0 05:57 06:57 4563 psi,Free spin off 1331 psi, WH 631, IA 644, OA 195 BOBD, CT Wt 10 k Itis, WOB 2.8 k lbs, ROP 130 fflhr Average ROP over interval 124 ft/hr 10/5/2018 10/5/2018 0.50 PRODS DRILL WPRT P PU 41k lbs, WOB fell off, noticed 9,859.0 9,859.0 06:57 07:27 baker screen had locked up. Continued to PU while troubleshooting. rectified, RBIH 10/5/2018 10/512018 1.20 PRODS DRILL DRLG P CT 5420 psi @ 1.81 bpm, Annular 9,859.0 10,155.0 07:27 08:39 4565 psi,Free spin diff 1412 psi, BOBD, CT Wt 11 k Itis, WOB 1.8k Ibs, ROP 200 ft/hr Average ROP over interval 247 ft/hr 10/5/2018 10/5/2018 0.30 PRODS DRILL WPRT P PU Wt 36 lbs - Wiper #2 - 800' 10,155.0 9,373.0 08:39 08:57 '" Note have beads in our high vis sweep left over from liner running pill 10/5/2018 10/5/2018 0.30 PRODS DRILL WPRT P RBIH - RIH Wt 14 k Ibis 9,373.0 10,155.0 08:57 09:15 10/5/2018 10/5/2018 2.70 PRODS DRILL DRLG P CT 5458 psi @ 1.81 bpm, annular 10,155.0 10,550.0 09:15 11:57 4633 psi,Free spin dif 1447 psi, WH 683 psi BOBD, CT Wt 7 k lbs, WOB 2.2 k lbs, ROP 100 ft/hr 10,299 PU Wt 37 k Itis - free spin 1,471 psi 10,350 PU Wt 40 k Itis - free spin 1,396 psi Time out 5x5 sweep for wiper Average ROP over interval 146 ft/hr 10/5/2018 10/5/2018 0.70 PRODS DRILL WPRT P PU Wt 38 lbs - Wiper #3 -to window 10,550.0 8,685.0 11:57 12:39 for tie in Billet clean Inadvertently came up through the window and back down through it with pumps on, neg and pos WOB spikes, motor did not torque up though. 10/5/2018 10/5/2018 0.20 PRODS DRILL OLOG P Tie into RA tag for a +4' correction 8,685.0 8,729.6 12:39 12:51 10/5/2018 10/5/2018 0.60 PROD3 DRILL TRIP P RBIH, billet clean 8,729.6 10,550.0 12:51 13:27 Page 27137 ReportPrinted: 1 011 512 01 8 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SW Depth Start Time End Time our (hr) Phase op code Aedvdy Cade Time P -T -x operedon (ftKe) End Depm(N(B) 1015/2018 10/5/2018 3.50 PROD3 DRILL DRLG P CT 5378 psi @ 1.79 bpm, annular 10,550.0 10,882.0 1327 16:57 4628 psi,Free spin dif 1312 psi, WH 636 psi BOBD, CT Wt 5.4 k lbs, WOB 1.36 k lbs. ROP 212 ft/hr 10,632' PU Wt 41 k Ibis -free spin 1,373 psi 10,652' PU Wt 39 k lbs, - free spin - Starting to run out of push- pull 100' BHAwiper. 10,785' PU W142 k lbs 10881' pu 54 and 42 k lbs, found something hard. tried to tiime out 5x5 sweep for wiper, pick up slow till sweep out Average ROP over interval 95 ft/hr 1015/2018 10/52018 0.40 PROD3 DRILL WPRT P PU Wt 40 lbs - Wiper #1 - 1000' 10,882.0 9,882.0 16:57 17:21 1015/2018 10/5/2018 0.40 PROD3 DRILL WPRT P RBIH 9,882.0 10,882.0 17:21 17:45 1015/2018 10/5/2018 1.25 PROD3 DRILL DRLG P BOBD, 1.78 bpm at 5,470 psi, Diff- 10,882.0 11,023.0 17:45 19:00 1,230 psi, WHP=722, BHP= -4,639, IA=654, OA=206 *** Note: New Mud at the bit @ 10,927' 1015/2018 1015/2018 1.60 PROD3 DRILL DRLG P PUH, obtain new drilling parameters 11,023.0 11,287.0 19:00 20:36 with new mud, OBD, 1.81 bpm at 5,062 psi, Diff=1,286 psi, WHP=914, BHP=4,642, IA=651, OA=203, 10/5/2018 10152018 0.30 PROD3 DRILL WPRT P Wiper up hole (1,000'), PUW 43 k 11,287.0 10,287.0 20:36 20:54 10/5/2018 10/512018 0.30 PROD3 DRILL WPRT P Wiper back in hole, RIW 11 k 10,287.0 11,287.0 20:54 21:12 1015/2018 10/5/2018 1.40 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,053 psi, 11,287.0 11,437.0 21:12 22:36 Diff -1,290 psi, WHP=927, BHP=4,665, IA=651, OA=208 1015/2018 1015/2018 0.15 PROD3 DRILL WPRT P PUH, PUW 41 k, short wiper up hole, 11,437.0 1,193.0 22:36 22:45 1015/2018 1015/2018 0.15 PROD3 DRILL WPRT P Wiper back in hole RIW 11 k 1,193.0 11,437.0 22:45 22:54 10/5/2018 1015/2018 0.60 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,053 psi, 11,437.0 11,518.0 22:54 23:30 Diff --1,290 psi, WHP=927, BHP=4,665, IA=651, OA=208 10/5/2018 10/52018 0.30 PROD3 DRILL WPRT P Incounter hard spot, work to get driling 11,518.0 11,518.0 23:30 23:48 ahead, PUW 35 k "` Note: Sample indicated Ankente 10/52018 1016/2018 0.21 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,053 psi, 11,516.0 11,522.0 23:48 00:00 Diff=1,290 psi, WHP=927, BHP=4,665, IA=651, OA=208 10/6/2018 10/6/2018 1.00 PROD3 DRILL DRLG P BOBD, 1.80 bpm at 5,153 psi, 11,522.0 11,563.6- 00:00 01:00 Diff --1,290 psi, WHP=927, BHP=4,665, IA=656, OA=206 1016/2018 10/6/2018 1.25 PROD3 DRILL DRLG P Incountered hard spot, PUW 33 k, drill 11,563.0 11,568.0 01:00 02:15 ahead slowly, BOBD, 1.80 bpm at 5,053 psi, Diff -1,290 psi, WHP=927, BHP=4,665, IA=656, OA=206 101612018 10/62018 0.60 PROD3 DRILL DRLG P Drill ahead, BOBD, 1.80 bpm at 5,335 11,568.0 11,619.0 02:15 02:51 1 1 I I psi, Diff -1,280 psi, WHP=927, BHP=4,665, IA=656, OA=206 10/6/2018 10/6/2018 1.25 PROD3 DRILL WPRT P Wiper up to the window, PUW 37 k 11,619.0 8,700.0 02:51 04:06 1 1 I Page 28137 Report Printed: 10/1512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM DePM Start Time End Time Dur (W) Phase Op Code ACMity Cade Time P -T -X Operation (M) End OePN(M(B) 10/6/2018 10/6/2018 0.20 FROM DRILL DLOG P Log the RA marker correction of plus 8,700.0 8,720.0 04:06 04:18 4.0' 10/6/2018 10/6/2018 0.70 PROD3 DRILL WPRT P Continue wiper back in hole, RIW 11 k 8,720.0 11,619.0 04:18 05:00 10/6/2018 10/6/2018 1.60 FROM DRILL DRLG P BOBD, 1.80 bpm at 5,194 psi, 11'619.0 11,629.0 05:00 06:36 Diff -1,238 psi, WHP=794, BHP=4,694, IA=655, OA=207 Drilling hard spot. Average ROP 6 fUhr 10/6/2018 10/6/2018 0.50 FROM DRILL DRLG P Drilling breakll,629' - ROP up to 200 11,629.0 11,685.0 06:36 07:06 ft/hr IA659 psi, 0A,209 psi OBD, CT 5487 psi, @ 1.80 bpm, annular 4728 psi, WH 850 psi CT WT 0 k lbs, WOB 2.1 k lbs, Average ROP 112 ft/hr 10/6/2018 10/6/2018 0.20 FROM DRILL WPRT P PU Wt 38 k, PUH past hard spot, neg 11,685.0 11,685.6- 07:06 07:18 WO spikes @ 11627', Saw positive WOB spikes when trying to RBIH @ same depth. Trouble RIH, reduce rale, etc. Pump 5x5 w 1% each 776/lowtorque Trouble area - 11,627 10/6/2018 10/6/2018 2.30 FROM DRILL DRLG P CT 5273 psi @ 1.75 bpm, Free spin 11,685.0 11,852.0 07:18 09:36 diff 1195 psi, annular 4749 psi, WH 847 psi OBD, CT WT -1 k lbs, WOB 1.8 k lbs, ROP 90 Po hr Average ROP 72 ff/hr 10/6/2018 10/6/2018 0.20 FROM DRILL WPRT P PU Wt 42 k, 200' wiper 11,852.0 11,852.0 09:36 09:48 10/6/2018 10/6/2018 5.50 FROM DRILL DRLG P CT 5332 psi @ 1.79 bpm, Free spin 11,852.0 12,065.0 09:48 15:18 diff 1262 psi, annular 4768 psi, WH 767 psi OBD, CT WT -4 k lbs, WOB 1.6 k lbs, ROP 90-20 fU hr many pick ups, 44 -48 k lbs, pumpng 5x5 lube sweeps as needed TD, let mill off from -4 k CT Wt to neutral. Average ROP 38 ft/hr TD @ 12,065 10/6/2018 10/6/2018 0.80 FROM DRILL WPRT P PU Wt 48 k, Pull up hole to 11,627' to 12,065.0 12,034.0 15:18 16:06 clean up trouble area. Sligt neg WOB then ran back through it at full rate and 57min. Pump 10 x 10 TD sweeps RBIH 10/6/2018 10/6/2018 1.20 PRODS DRILL WPRT P PU WT 38 k lbs wiper to window. 12,034.0 8,701.0 16:06 17:18 10/6/2018 10/6/2018 0.20 FROM DRILL WPRT P Tie into the RA tag for a+3.5 8,701.0 8,721.0 17:18 17:30 1 1 correction 10/6/2018 10/6/2018 1.20 PROD3 DRILL WPRT P RBIH to confirm depth 8,721.0 12,066.0 17:30 18:42 10/62018 10/6/2018 1.30 PRODS DRILL WPRT P POOH, laying in beaded drilling fluid 12,066.0 8,700.0 18:42 20:00 10/62018 10/62018 1.00 PRODS DRILL TRIP P Continue POOH, increase pump rate 8,700.0 3,000.0 20:00 21:00 1.8 bpm at 5,370 psi, IA=642, OA=207 10/6/2018 10/6/2018 0.75 FROM DRILL TRIP P Perform jog IH, jet across orbit valve, 3,000.0 3,600.0 21:00 21:45 continue POOH 10/6/2018 10/6/2018 0.75 FROM DRILL TRIP P Check well for flow, PJSM, LD drilling 78.2 0.0 21:45 22:30 assembly over a dead well. Page 29137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 . e e Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth StartTime End Tine Dur(hr) Phase Op Code Activity Code The P-T-x Operation (IIKB) End Depth(1tKB) 1016/2018 10/6/2018 0.80 COMPZ3 CASING PUTB P Prep RF for liner OPS. 0.0 0.0 22:30 23:18 1016/2018 10/7/2018 0.70 COMPZ3 CASING PUTB P PJSM, pick up liner segment #1 w/ 66 0.0 407.9 23:18 00:00 jts of slotted liner 10/712018 10/7/2018 2.00 COMM CASING PUTB P Continue picking up Lt-05 completion 407.9 2,036.3 00:00 02:00 liner segement #1, Jt #13 10/7/2018 10/7/2018 0.50 COMPZ3 CASING PUTB P Clear RF of liner running equipment, 2,036.3 2,036.3 02:00 02:30 PJSM 10/7/2018 10/7/2018 1.20 COMM CASING PULD P PU/MU Coiltak tools, surface test 2,036.3 2,081.8 02:30 03:42 (good-test), check pac-offs (good), switched out BHI check UCG 10/7/2018 10!7/2018 2.10 COMPZ3 CASING RUNL P Tag up reset counters, RIH, pumping 2,081.8 10,412.0 03:42 05:48 min rate, PU Wt 41 k @ 8581' 10/7/2018 10!7/2018 0.20 COMPZ3 CASING DLOG P Tie into the K1 for a +2' correction. 10,412.0 10,441.0 05:48 06:00 1017/2018 10/7/2018 0.60 COMPZ3 CASING RUNL P Coninue to RIH, SID @ 12,066'. PU 10,412.0 12,066.0 06:00 06:36 WT 50 k -5.4 k WOB. RBIH, SID 3.4 k WOB, Bring rate to 1.64 bpm, diff 981 psi, PU Wt 37k WOB -1.40 k lbs, liner released, down on the pump. 10/7/2018 10/7/2018 0.10 COMPZ3 CASING TRIP P PUH, park, reset counters to acount 12,066.0 10,016.3 06:36 06:42 for dropped off liner 10/7/2018 10/7/2018 2.40 COMPZ3 CASING TRIP P POOH, park near surface, open EDC, 10,016.3 50.0 06:42 09:06 continue out of hole. 10/7/2018 10P/2018 1.00 COMPZ3 CASING PULD P Close Orbit valve, trap 1733 psi WH 50.0 0.0 09:06 10:06 that bled to 1526 psi in 20 min. LD BHA # 26. 101712018 1017/2018 0.40 COMPZ3 CASING PUTS P Clear and prep floor to run liner. 0.0 0.0 10:06 10:30 10/7/2018 1017/2018 1.30 COMPZ3 CASING PUTS P PU L1-05 upper completion ( run #2 ). 0.0 854.0 10:30 11:48 27 joints 2-3/8" 4.6 Ib/fl ST-L slotted liner under an anchored liner top billet with a ported bull nose. (LOA 854.76') 10/712018 10/7/2018 1.70 COMPZ3 CASING PUTB P PJSM, PU BHA, check pack off, good, 854.0 916.0 11:48 13:30 stab injector, tool test good, bump up, set counters. 10/7/2018 1017/2018 3.20 COMPZ3 CASING RUNL P RIH, tie into whie window flag for- 916.0 10,024A 13:30 16:42 19.5' correction. Pumps off, dose EDC, PU WT 40k lbs. continue to RIH. Tag up 10,024', SID 2.9 k IDS. PU, 39k lbs. RBIH, Oriented 180 ° ROHS, SID 2.48k lbs, TOB @ 9,170'. Pickup to neutral weight. WH 1135 pi. Line up pump to coil. Weak point sheared @ 6200 psi. 1017/2018 10772018 1.40 COMM CASING TRIP P PU 33 k Itis, park, reset counters, 10,024.0 50.0 16:42 18:06 POOH 10/7/2018 10/712018 1.50 COMPZ3 CASING PULD P PUD BHA 10,024.0 50.0 18:06 19:36 1017/2018 10/7/2018 0.50 COMPZ3 CASING PULD P LD settling tools 50.0 0.0 19:36 20:06 10/7/2018 10/72018 0.50 PROD4 DRILL CTOP P PJSM, jet BOP Stack 0.0 0.0 20:06 20:36 10/7/2018 1017/2018 0.60 PROD4 DRILL CTOP P Grease crew on location, grease well 0.0 0.0 20:36 21:12 head and swab valves, prep test joint 10/7/2018 1017/2018 0.80 PROD4 DRILL CTOP P Test and chart inner reel valve and 0.0 0.0 21:12 22:00 pac-off. 10/7/2018 10/8/2018 2.00 PROD4 WHDBOP BOPE P Perform Bi-weekly BOP test 250 0.0 0.0 22:00 00:00 low/2,500 annular/4,900 psi high, state wiliness waived (Brian Bixby) Page 30137 ReportPrinted: 10/15/2018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log De Start Depth Shut start Tme End Tmre Dur(hr) ( Phase O code p Activity Cade My Time P -T -X Operetlon End Depth (MB) 10/8/2018 10/8/2018 3.00 PROD4 WHDBOP BOPE P Continue Bi -weekly BOP test 250 0.0 0.0 00:00 03:00 low/2,500 annular/4,900 psi high, state Witness waived (Brian Bixby) 10/8/2018 1018/2018 1.50 PROD4 WHDBOP BOPE P Mechanic on location, PJSM, locklout 0.0 0.0 03:00 04:30 equipment, suck down stack, replace B7, manual 10/8/2018 10/8/2018 1.80 PROD4 WHDBOP BOPE P Fill stack, install test joint, continue 0.0 0.0 04:30 06:18 with BOP lest (12-15) "•8:00 hr test 10/8/2018 10/8/2018 1.00 PROD4 STK CTOP P Blow down, install checks, valve 0.0 0.0 06:18 07:18 checklist post BOP test, PJSM 10/8/2018 10/8/2018 2.40 PROD4 STK PULD P PU & PD BHA#26, 1.2° AKO baker 0.0 72.0 07:18 09:42 omotor over a BH P104 cutter bit. Hung up in stack with high bend motor, worked it free, crowned tool out in PDL, ran BHA in to no go, had to work wire to space out. Popped off PDL, spaced out -4.5'to high. Stab back on, RBIH, continue PD, spaced out corectly. continue on, inspect pack offs, good. Stab injetor, bump up, set counters. 10/8/2018 10/8/2018 1.60 PROD4 STK TRIP P RIH 72.0 8,400.0 09:42 11:18 10/8/2018 10/812018 0.20 PROD4 STK DLOG P Tie into the K1 for -11 ' correction. 8,400.0 8,424.3 11:18 11:30 10/8/2018 10/812018 0.20 PROD4 STK TRIP P Continue to RIH 8,424.3 9,170.0 11:30 11:42 PU Wt 38 k @ 8160' Close EDC, continue to RIH, tag TOB 9170' PU Wt 40 k lbs 10/8/2018 10/812018 1.40 PROD4 STK KOST P Start time milling, tff/hr @ 9170. 9,170.0 9,170.6 11:42 13:06 Stall X3 @ 9170.6', 9170.3, & 9170.2', PU WPs 37 - 33 k lbs 10/8/2018 10/8/2018 0.60 PROD4 STK KOST P RBIH after last PU. CT Wt falling off, 9,170.6 9,170.6 13:06 13:42 WOB falling off, should have picked up an agitator w this high bend motor. Fighting a little slip stick. Activated low frequency, surface controlled, agitator. Regained WOB and vibrations. Mill ahead, aluminum at the shaker. 10/8/2018 10/8/2018 0.20 PROD4 STK KOST P WOB falling off at curent ROP, 9,170.6 9,171.1 13:42 13:54 increase to 2 ft/min ahead of schedule. targeting 100-150 lbs WOB 10/8/2018 10/6/2018 0.70 PROD4 STK KOST P Increase to 3 ft/min 9,171.7 9,173.2 13:54 14:36 targeting 100-150 Ibs WOB 10/8/2018 10/8/2018 0.60 PROD4 STK KOST P Increase to 5 ft/min, WOB stedily 9,173.2 9,175.7 14:36 15:12 came up, targeting WOB - 1-1.8 k lbs by regulating ROP. 1018/2018 10/8/2018 1.40 PROD4 DRILL DRLG P WOB fell from 1.78 - 360 Ibs from 9,175.7 9,277.0 15:12 16:36 9174.9 to 9175.0' Drilling ahead slowly targeting greater than 1 k less than 2 k Ibs WOB, Drill ahead after 9184' 10/8/2018 10/8/2018 0.20 PROD4 DRILL WPRT P PU Wt 40 k Ibs, PUH 9,277.0 9,277.0 16:36 16:48 Dry drift the billet - clean RBIH 10/812018 10/8/2018 0.90 PROD4 DRILL DRLG P CT 4484 psi @ 1.78 bpm, free spin diff 9,277.0 9,385.0 16:48 17:42 490 psi, annular 4560 psi, WH 823 psi, IA 640 psi, OA 194 psi. BOBD, CT 11 k lbs, WOB 2.3 klbs, ROP 115 it/hr Page 31137 ReportPrinted: 1 0/1 512 01 8 Operations Summary (with Timelog Depths) 31-01 %Og: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log wart Depth Stmt Time End Time Dur PM Phase Op code Activity Code Time P -T -x Operation (ftKB) End Depth (M(B) 10/8/2018 1018/2018 2.40 PROD4 DRILL TRIP P TO turn early @ 9385', PU wt 39 k lbs 9,385.0 45.0 17:42 20:06 Jog to time out 5x5 sweep PUH past billet, clean, and window, - 1.7 k lbs, WOB tug Open EDC, continue out of hole. •" Saw 10k lbs string weight over pull and -4k WOB @ 8517' locator assembly. 10/8/2018 10/8/2018 1.30 PROD4 DRILL PULD P Bump up, space out, PUD BHA #26, 45.0 0.0 20:06 21:24 10/8/2018 10/8/2018 1.30 PROD4 DRILL PULD P PD BHA#27, skid cart, check pack 0.0 78.0 21:24 22:42 offs, replae with new, stab injector, bump up, set counters. 10/812018 10/8/2018 1.20 PROD4 DRILL TRIP P RIH, Shallow test the agitator. looks 78.0 8,400.0 22:42 23:54 like the agitator is showing up at - 16 Hz Rale Ann Bore Circ Diff (psi) 1.10 1832 2391 3797 544 1.52 1740 2653 4640 912 1.80 1716 2975 5401 1241 10/8/2018 10/9/2018 0.10 PROD4 DRILL TRIP P Tie into the K1 marker for a minus 8,400.0 6,050.0 23:54 00:00 20.5 correction. 1019/2018 10/9/2018 0.45 PROD4 DRILL TRIP P Continue RIH w/ lateral drilling BHA 6,050.0 8,400.0 00:00 00:27 1019/2018 10/9/2018 0.20 PROD4 DRILL DLOG P Log the formation, (K1 marker) 8,400.0 8,445.0 00:27 00:39 correction minus 20' 1019/2018 1019/2018 0.20 PROD4 DRILL TRIP P Continue IH 8,445.0 9,385.0 00:39 00:51 1019/2018 10/9/2018 3.90 PROD4 DRILL DRLG P OBD, 1.77 bpm at 5,409 psi FS, 9,385.0 9,785.0 00:51 04:45 Diff --1,450 psi, WHP=668, BHP=4,567, IA=629, OA=187 10/9/2018 10/9/2018 0.30 PROD4 DRILL WPRT P Wiper up hole, PUW 41 k 9,785.0 9,200.0 04:45 05:03 10/9/2018 10/9/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole 9,200.0 9,785.0 05:03 0521 10/9/2018 10/9/2018 2.70 PROD4 DRILL DRLG P BOBD, 1.78 bpm at 5,301 psi FS, 9,785.0 10,175.0 05:21 08:03 Diff --1,250 psi, WHP=765, BHP=4,618, IA=644, OA=197 10/9/2018 10/9/2018 0.45 PROD4 DRILL WPRT P Wiper up hole, PUW 41 k 10,175.0 9,200.0 08:03 08:30 10/9/2018 10/9/2018 0.45 PROD4 DRILL WPRT P Wiper back in hole, RIW 9,200.0 10,175.0 08:30 08:57 10/9/2018 10/9/2018 1.00 PROD4 DRILL DRLG P BOBO, 1.80 bpm at 5,300 psi FS, 10,175.0 10,320.0 08:57 09:57 Diff=1,190 psi, WHP=752, BHP=4,645, IA=646, OA=200 10/9/2018 10/9/2018 0.20 PROD4 DRILL WPRT P PUH for a BHA wiper (100') 10,320.0 10,320.0 09:57 10:09 10/9/2018 10/9/2018 1.35 PROD4 DRILL DRLG P BOBD, 1.80 bpm at 5,350 psi FS, 10,320.0 10,450.0 10:09 11:30 Diff --1,253 psi, WHP=718, BHP=4,625, IA=648, OA=202 10/9/2018 10/9/2018 0.65 PROD4 DRILL WPRT P Wiper up to the window for a tie in. 10,450.0 8,700.0 11:30 12:09 PUW 37 k, performing jog back in hole from 9,200'-9,380' 10/9/2018 10/9/2018 0.20 PROEM DRILL DLOG P Log the RA marker for depth control 8,700.0 8,718.0 12:09 12:21 (plus 75) 10/9/2018 10/912018 0.65 PROD4 DRILL WPRT P Continue wiper back in hole, RIW 11 k 8,718.0 10,450.0 12:21 13:00 10/9/2018 10/9/2018 4.70 PROD4 DRILL DRLG P BOBD, 1.78 bpm at 5,257 psi FS, 10,450.0 10,919.0 13:00 17:42 Diff=1,187 psi, WHP=769, BHP=4,657, IA=648, OA=202 "" Note: New Mud at the bit 10,509', old mud stats: 2,478' DF / 0.96% DS Page 32137 ReportPrinted:1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log alert Depth I Siert Tme End Time Dur(hr) Phase Op Code Activity Code Time P -T -X Operation (flk8) End Depth(Wlt) 10/9/2018 1101912018 0.80 PROD4 DRILL WPRT P 10,919 pull 1 000'wiper trip, 10,919.0 10,919.0 17:42 18:30 PUW=45K 10/9/2018 10/9/2018 1.30 PROD4 DRILL DRLG P 10,919', Drill, 1.82 BPM @ 5140 PSI 10,919.0 11,125.0 18:30 19:48 FS, BHP=4711 10/9/2018 1019/2018 0.30 PROD4 DRILL WPRT P 11,125'. BHA+wiper trip. PUW=45K 11,125.0 11,125.0 19:48 20:06 10/9/2018 10/9/2018 1.90 PROD4 DRILL DRLG P 11126, Drill, 1.82 BPM @ 5285 PSI 11,125.0 11,270.0 20:06 22:00 FS, BHP=4705, ROP=140 FPM, Drilling break @ 11223', ROP down to 10 FPH. Hard to maintain steady state drilling. Pump sweeps. Several pick ups. Drill improves -11,240 1019/2018 10/9/2018 0.70 PROD4 DRILL WPRT P 11,270', 1000'wiper trip, PUW=41K 11,270.0 11,270.0 22:00 22:42 10/9/2018 10/10/2018 1.30 PROD4 DRILL DRLG P 11,270', Drill, 1.8 BPM @ 5325PSI FS, 11,270.0 11,377.0 22:42 00:00 BHP=4785 10/10/2018 10/10/2018 0.10 PROD4 DRILL WPRT P BHA wiper, stacking 11,377.0 11,377.0 00:00 00:06 10/10/2018 10/10/2018 1.10 PROD4 DRILL DRLG P 22,377', Drill 1.81 BPM @ 5324 PSI 11,377.0 11,442.0 00:06 01:12 FS, BHP=4785 10/10/2018 10/10/2018 0.20 PROD4 DRILL WPRT P 200'wiper trip, PUW=47K 11,442.0 11,442.0 01:12 01:24 10/10/2018 10/10/2018 2.30 PROD4 DRILL DRLG P 11442', Drill, 1.81 BPM @ 5292 PSI 11,442.0 11,491.0 01:24 03:42 FS, BHP=4706, RIW=-4K, DHWOB=I.1 K, Drilling break @ 11461, ROP -20 FPHTrying to build, Multiple pick ups 10/10/2018 10110/2018 0.30 PROD4 DRILL WPRT P Pull 400'wiper, PUW=51 K, Clean 11,491.0 11,491.0 03:42 04:00 wiper with sweeps 10/10/2018 10110/2018 1.25 PROD4 DRILL DRLG P 11491', Drill, 1.8 BPM @ 5282 PSI FS, 11,491.0 11,542.0 04:00 05:15 BHP=4699, Wiper helped with ROP 20-40 FPH, Drilling break @ 11,503' ROP to 70-100 FPH RIW @ 0 with 1.6K DHWOB 10/10/2018 10/10/2018 1.40 PROIX DRILL WPRT P wiper up hole to the window for a tie 11,542.0 8,700.0 05:15 06:39 in, PUW 47 k, performing jog from 19,200'-9,350- 10/10/2018 10/10/2018 0.15 PROD4 DRILL DLOG P Log the RA marker correction of plus 8,700.0 8,718.6 06:39 06:48 8.5' 10110/2018 10/10/2018 1.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 6 k 8,718.6 11,542.0 06:48 08:06 10/10/2018 10/10/2018 0.40 PROD4 DRILL DRLG P BOBO, 1.77 bpm at 5,278 psi FS, 11,542.0 11,576.0 08:06 08:30 Diff --1,123 psi, WHP=855, BHP=4,748. IA=656, OA=210 10/10/2018 10/10/2018 0.50 PROD4 DRILL WPRT P Wiper up hole 100' 11,576.0 11,576.0 08:30 09:00 10/10/2018 10/10/2018 2.00 PROD4 DRILL DRLG P Fighting hard spot with some weight 11,576.0 11,610.0 09:00 11:00 transfer issues, multiple pickups and manipulating pump rates, continue drilling ahead. OBD, 1.77 bpm at 5,278 psi FS, Diff -1,123 psi, WHP=855, BHP=4,748. IA=656, OA=210 10/10/2018 10/10/2016 0.25 PROD4 DRILL WPRT P Encounter 100% losses, slowly 11,610.0 11,100.0 11:00 11:15 1 1 healing up, Wiper up hole 500' 10/10/2018 10/10/2018 0.30 PRO DRILL WPRT P Wiper back in hole, RIW 9 k 11,100.0 11,610.0 11:15 11:33 10/1012018 10110/2018 0.30 PROD4 DRILL DRLG P BOSO, 1.77 bpm at 5,278 psi FS, 11,610.0 11,642.0 11:33 11:51 Diff -1,123 psi, WHP=855, BHP=4,748. IA=656, OA=210 10/10/2018 10/10/2018 0.50 PROD4 DRILL WPRT PCall TO Lt lateral, PUH send 10x10 11,642.0 11,642.0 11:51 12:21 sweep Page 33137 ReportPrinted: 1011512018 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log seat Depth Start Time End Tme dv (hr) Phase Op Code Aodvity Code Time P-T-X Operation (MB) End Depth (M(B) 10/10/2018 10/10/2018 1.25 PROD4 DRILL WPRT P Wiper up hole chasing sweeps to the 11,642.0 8,700.0 1221 13:36 window 10/10/2018 10/10/2018 0.20 PROD4 DRILL DLOG P Log the RA marker for depth control, 8,700.0 8,744.0 13:36 13:48 correction of plus 3.0' 10110/2018 10/10/2018 0.75 PROD4 DRILL WPRT P Contiue wiper back in hole, RIW 14 k 8,744.0 10,884.0 13:48 14:33 10/10/2018 10/10/2018 0.75 PROD4 DRILL WPRT P Bobble @ 10,884'-10,895', PUH 10,884.0 10,895.0 14:33 15:18 attempt to dean area w/DTF, no change, 10110/2018 10/1012018 0.30 PROD4 DRILL WPRT P Continue IH 10,895.0 11,400.0 15:18 15:36 10/10/2018 10/10/2018 3.00 PROD4 DRILL TRIP P POOH, laying in beaded liner running 11,400.0 58.0 15:36 18:36 pill up to the window. Close Orbit vale @ 200', Tag up and space out 10/10/2018 10/10/2018 1.00 PROD4 DRILL PULD P PJSM, Flow chec well, Lay down BHA 58.0 0.0 18:36 19:36 #27 L1 lateral drilling BHA. Observed flat area in CT. UT test @ .178 thinnest area we could find 10/10/2018 10/11/2018 4.40 COMPZ4 CASING PUTB P PJSM, Prep floor and M/U BHA #28 0.0 2,323.7 1936 00:00 with non ported bullnose, 57 Jts slotted 2 3/8" liner, and liner top billet. M/U to coil trek and surface test. Tag up and set depth 10/1112018 10/11/2018 1.10 COMPZ4 CASING TRIP P Trip in hole, BHA #28 2,323.7 8,646.0 0000 01:06 10/11/2018 10/11/2018 0.10 COMPZ4 CASING DLOG P Tie into white EDP flag for -22.7 8,646.0 8,624.0 01:06 01:12 10/11/2018 10/11/2018 2.30 COMPZ4 CASING TRIP P Continue trip in hole, Clean pass 8,624.0 11,404.0 01:12 03:30 hrough window, Initial set down @ 10025, Start working pipe with continued movement down. Unable to tie in due to hole conditions. get to set depth @ 11404.5'. Pull out slack an pump off. Did not releaase on frtst atempt. PUW=51 K, DHWOB=-10k. Work back down to set depth. Pull slack RIH to -2K DHWOB. Pump off. PUW=38 K DHWOB=-3K. 10/11/2018 10/11/2018 2.00 COMPZ4 CASING TRIP P PUH to 11387. Remove liner length 9,107.0 200.0 03:30 05:30 left in hole from counters. Trip out filling across top 10/11/2018 10/11/2018 1.20 COMPZ4 CASING PULD P At surface spaceout, PUD & LD 200.0 O.0 05:30 06:42 setting tools 10/11/2018 10/11/2018 1.20 PRODS STK PULD P PJSM, PD build section BHA#29, stab 0.0 72.2 06:42 07:54 UOC, surface test tools (good-test), stab/MU INJH 10/11/2018 10/11/2018 1.50 PROD5 STK TRIP P Tag up, re-set counters, RIH 72.2 8,400.0 07:54 09:24 10/11/2018 10/11/2018 0.15 PRODS STK DLOG P Log the Kl marker correction of minus 8,400.0 8,444.0 09:24 09:33 19' 10/11/2018 10/11/2018 0.45 PRODS STK TRIP P Continue to RIH, PU Wt 38 k @ 8,444.0 9,126.0 09:33 1000 8,160', Close EDC, continue to RIH, tag TOB @ 9,126.3' PU Wt 38 k lbs 10/1112018 10/11/2018 2.00 PRODS STK KOST P Start time milling, 9,126.0 9,128.4 10:00 12:00 lftlhr @ 9,126.25' 2ft/hr @ 9127.25' 3 ft/hr @ 9128.25' 10/11/2018 10/11/2018 0.20 PROD5 STK KOST P Increase WOB to 1k 9,128.4 9,132.0 12:00 12:12 I I I I Page 34/37 ReportPrinted: 10/1512018 Operations Summary (with Timelog Depths) 31-01 li p Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth rt Stat Tine End Time our (hr) Phase Op COW Activity Code Time P -T -X Operation Ke) End Depth (flKe) 10/11/2018 10/11/2018 0.20 PRODS DRILL DRLG P Drill Ahead, 1.78 bpm at 4,521 psi, 9,132.0 9,137.0 12:12 12:24 Diff -491 psi, WHP=929, BHP=4,538, IA=652, OA=208 10/11/2018 10/11/2018 0.15 PRODS DRILL DRLG P Stacking weight @ 9,132', PUH and re 9,137.0 9,137.0 12:24 12:33 -start 10/11/2018 10/11/2018 0.75 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,569 psi, Diff=521 9,137.0 9,215.0 12:33 13:18 psi, WHP=925, BHP=4,543, IA=658, OA=208 10/11/2018 10111/2018 0.15 PRODS DRILL WPRT P PU Wt 38 k lbs, PUH 9,215.0 9,102.0 13:18 13:27 Dry drift the billet - clean RBIH 10111/2018 10111/2018 0.15 PRODS DRILL WPRT P RBIH to bottom, send 5x5 sweep 9,102.0 9,215.0 13:27 13:36 10/11/2018 10/11/2018 0.65 PRODS DRILL DRLG P OBD, 1.78 bpm at 4,569 psi, Diff -521 9,215.0 9,325.0 13:36 14:15 psi, WHP=925, BHP=4,543, IA=658, OA=208 10/11/2018 10/11/2018 1.00 PRODS DRILL DRLG P 9,325', TO build section,POOH, PUW 9,325.0 5,780.0 14:15 15:15 38k. open EDC above window, continue POOH, Function closed EDC, obtain screen shots w/no agitator, 1.0 bpm, 1.5 bpm, and 1.8 bpm. continue POOH, Avg DLS=38° 10/11/2018 10/11/2018 1.50 PRODS DRILL TRIP P Continue POOH, Stop at 500'. Obtain 5,780.0 51.0 15:15 16:45 screen shots @ 1, 1.5, and 1.8 BPM. Continue to surface 10/11/2018 10/11/2018 1.30 PRODS DRILL PULD P At surface, Tag up and space out, 51.0 0.0 16:45 18:03 PJSM PUD BHA#29 10/11/2018 10/11/2018 1.00 PRODS DRILL SVRG P MN Nozzle, stab on and jet stack. 0.0 0.0 18:03 19:03 Flush stack and micro motion 10111/2018 10/11/2018 1.15 PRODS DRILL PULD P PJSM, PD BHA# 30 L1-02 lateral 0.0 78.2 19:03 20:12 drilling BHA with .5° AKO motor, Make up to coil, Strip on and surface test. 10/11/2018 1011112018 1.60 PRODS DRILL TRIP P RIH BHA#30, test agitator @ 500' 78.2 8,400.0 20:12 21:46 with screenshots, continue in hole 10111/2018 10/11/2018 0.20 PRODS DRILL DLOG P Log K1 for -21' correction 8,400.0 8,424.0 21:48 22:00 10/11/2018 10/11/2018 0.40 PRODS DRILL TRIP P Continue in well, set down @ 8693, 8,424.0 9,325.0 22:00 22:24 PUH roll pump, S/D and pass through 10/11/2018 10/12/2018 1.60 PRODS DRILL DRLG P Tag up and drill from 9325', 1.78 BPM 9,325.0 9,577.0 22:24 00:00 @ 5220 PSI FS, BHP=4672, RIW=10.9K, DHWOB=I.8K 10/12/2018 10/12/2018 1.40 PRODS DRILL DRLG P 9577', Drill, 1.78 BPM @ 5220 PSI 9,577.0 9,750.0 00:00 01:24 FS, BHP=4611 10/12/2018 10/1212018 0.50 PRODS DRILL WPRT P 9750', Wiper to billet -9130, 9,750.0 9,750.0 01:24 01:54 PUW=381< 10112/2018 10/12/2018 1.00 PRODS DRILL DRLG P 9750', Drill, 1.78 BPM @ 5335 PSI 9,750.0 9,875.0 01:54 02:54 FS, BHP=4610, RIW=10.2K, DHWOB=I.1K 10/12/2018 10/12/2018 0.10 PRODS DRILL WPRT P 9875, BHA Wiper, PUW=38K 9,875.0 9,875.0 02:64 03:00 10/12/2018 10112/2018 2.00 PRODS DRILL DRLG P 9875', Drill, 1.78 BPM @ 5335 PSI 9,875.0 10,152.0 03:00 05:00 FS, BHP=4610, RIW=9.8K DHWOB=1.2K 10/12/2018 10/12/2018 0.25 PRODS DRILL WPRT P 10152', Wiper to 9350, PUW=36K 10,152.0 9,350.0 05:00 0515 10/12/2018 10/12/2018 0.25 PRODS DRILL WPRT P Wiper back in hole, RIW 7.5 k 9,350.0 10,152.0 05:15 05:30 10112/2018 10/12/2018 1.00 PRODS DRILL DRLG P BOBD,1.78 bpm at 5,347 psi FS, 10,152.0 10,334.0 05:30 06:30 Diff -941, BHP=4,692, IA=643, OA=208 Page 36137 Report Printed: 1 011 5/2 01 8 Operations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Srad Mme End Time Dur(hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Deplh M) 10/12/2018 10/12/2018 0.75 PRODS DRILL WPRT T DO wiper up hole, PUW=42 k 10,334.0 10,334.0 06:30 07:15 10/1212018 10/12/2018 1.65 PRODS DRILL TRIP T Continue POOH, after discussing plan 10,334.0 72.2 07:15 08:54 forward decision was made to POOH for ako change. PJSM for UD 10/12/2018 10/12/2018 1.20 PRODS DRILL PULD T At surface, spaceout, PUD Lateral 72.2 0.0 08:54 10:06 Drilling BHA#30 10112/2018 10/12/2018 0.20 PRODS DRILL PULD T Change out drilling motor and agitator, 0.0 0.0 10:06 10:18 1 inspect bit 1011212018 10/12/2018 0.65 PRODS DRILL PULD T PD, L1-02 lateral drilling BHA #31 0.0 78.3 10:18 10:57 10/12/2018 10/12/2018 1.50 PRODS DRILL TRIP T RIH, pumping min rate @ 2,600 psi 78.3 8,400.0 10:57 12:27 10/12/2018 10/12/2018 0.20 PRODS DRILL DLOG T Log the K1 marker correction of minus 8,400.0 8,428.0 1227 1239 201, PUW 36 k 10/12/2018 10/12/2018 0.90 PRODS DRILL TRIP T Continue IH 8,428.0 10,334.0 12:39 13:33 10/12/2018 10/12/2018 1.95 PRODS DRILL DRLG P OBD, 1.80 bpm at 5,190 psi FS, 10,334.0 10,537.0 13:33 15:30 Diff-992, BHP=4,658, WHP=758, IA=648, OA=204, swap mud with new mud at bit 10490 10/12/2018 10/12/2018 0.20 PRODS DRILL WPRT P New mud all around, pull short wiper 10,537.0 10,537.0 15:30 15:42 to update pressure parameters, PUW=38K 10/12/2018 10/12/2018 1.50 PRODS DRILL DRLG P 10537', Drill 1.81 BPM @ 4995 PSI 10,537.0 10,733.0 15:42 17:12 FS, BHP=4657 10/12/2018 10/12/2018 0.70 PRODS DRILL WPRT P 10,733 pull 1000' wiper, PUW=45K 10,733.0 10,733.0 17:12 17:54 10/12/2018 10/12/2018 1.10 PRODS DRILL DRLG P 10733', Drill, 1.8 BPM @ 4933 PSI 10,733.0 10,873.0 17:54 19:00 FS, BHP=4688 10/12/2018 10/12/2018 0.30 PRODS DRILL WPRT P Stacking with poor transfer, Pull 250' 10,873.0 10,873.0 19:00 19:18 wiper, PUW=45K 10/12/2018 10/12/2018 1.60 PRODS DRILL DRLG P 10873', Drill 1.79 BPM @ 4915 PSI 10,873.0 11,098.0 19:18 20:54 FS, BHP=4667, RIW=-4K, DHWOB=2K 10/1212018 10/1212018 0.80 PRODS DRILL WPRT P 1000'wiper, PUW=40K 11,098.0 11,098.0 20:54 21:42 10/12/2018 10/12/2018 1.10 PRODS DRILL DRLG P 11098', drill, 1.78 BPM @ 5030 PSI 11,098.0 11,270.0 21:42 22:48 FS, BHP=4710, RIW=5K, DHWOB=1.9K 10/12/2018 10/12/2018 0.10 PRODS DRILL WPRT P 11270'. BHA wiper, PUW=46K 11,270.0 11,270.0 22:48 22:54 10/12/2018 10/13/2018 1.10 PRODS DRILL DDRL P 11270', Drill, 1.78 BPM @ 5080 PSI 11,270.0 11,378.0 22:54 00:00 FS, BHP=4715, RIW=-1K, DHWOB=I.4K 10/13/2018 10/13/2018 0.30 PRODS DRILL DRLG P Drilling, 1.8 BPM @ 5080 PSI FS, 11,378.0 11,400.0 00:00 00:18 BHP=4750 10/13/2018 10/13/2018 1.60 PRODS DRILL WPRT P Call TD, 10 X 10 sweeps coming out, 11,400.0 8,400.0 00:18 01:54 Wiper to window. Pull into casing and circ bottoms up 10/13/2018 10/13/2018 0.10 PRODS DRILL DLOG P Log K1 for +4'correction 8,400.0 8,422.0 01:54 02:00 10/13/2018 10/13/2018 1.20 PRODS DRILL WPRT P Wiper back to bottom to confirm TO. 8,422.0 11,400.0 02:00 03:12 Hole very clean, took 800 Lb DHWOB @ 10,025. 10/13/2018 10/13/2018 0.30 PRODS DRILL WPRT P Tag TO @ 11400. PUH to get beaded 11,400.0 11,400.0 03:12 03:30 liner running pill to bit 10/13/2018 10113/2018 2.50 PRODS DRILL TRIP P Trip out of hole pumping 50 BBI 11,400.0 80.0 03:30 06:00 beaded liner running pill, PUW=39K Page 36/37 ReportPrinted: 10/15/2018 . Gperations Summary (with Timelog Depths) 31-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End 7me Dur(hp Phase op Cafe Activity Cone Time P -T -X Operation start Depth (hKa) End Depth(%Ke) 10/13/2018 10/13/2018 1.50 PROD5 DRILL PULD P At surface, function closed orbit valve 80.0 0.0 06:00 07:30 (1,700 psi), check well for flow, LD drilling BHA on a dead well, 10/13/2018 10/13/2018 0.50 COMPZ5 CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0 07:30 08:00 10/13/2018 10/13/2018 3.50 COMPZ5 CASING PUTB P MU 69 jts of slotted liner 0.0 2,732.1 08:00 11:30 10/13/2018 10/13/2018 0.50 COMPZ5 CASING PULD P PU/MU Coiltrak tools, surface test 2,732.1 2,776.3 11:30 12:00 (good -test), check pac-offs 10/13/2018 10/13/2018 1.50 COMPZ5 CASING RUNL P RIH, with Lt -02 slotted liner 2,776.3 8,575.8 12:00 13:30 completion 10/13/2018 10/13/2018 0.10 COMPZ5 CASING RUNL P Correct to the EDP flag minus 23.15' 8,575.8 8,578.8 13:30 13:36 10/13/2018 10/13/2018 0.50 COMPZ5 CASING RUNL P Continue IH 8,578.8 9,743.0 13:36 14:06 10/13/2018 10/13/2018 2.50 COMPZ5 CASING RUNL T Initial set down, work pipe towards 9,743.0 11,400.0 14:06 16:36 bottom, PUW 42-55 k 10/13/2018 10/13/2018 0.20 COMPZ5 CASING RUNL P Bring pump up to 1.54 bpm, Diff=954 11,400.0 8,655.0 16:36 16:48 psi, PUW 38 k, remove liner length from counters, "' Note: TOL @ 8667.91' 10/13/2018 10/13/2018 1.80 DEMOB WELLPR DISP P Displace well to SW start tripping out 8,655.0 2,998.0 16:48 18:36 10/13/2018 10/13/2018 1.00 DEMOB WELLPR CIRC P Stop and S/I orbit valve, 1710 PSI 2,998.0 2,998.0 18:36 19:36 under valve, Pump 30 BBIs diesel freeze proect 10/13/2018 10/13/2018 0.40 DEMOB WELLPR TRIP P Continue out of well 2,998.0 55.0 19:36 20:00 10/13/2018 10113/2018 0.70 DEMOB WELLPR PULD P At surface, PJSM lay down BHA on 55.0 0.0 20:00 20:42 dead well, Flow check - Good. Inspect CT for flat spots/ wear. 10/13/2018 10/13/2018 1.00 DEMOB WELLPR CTOP P Pull checks out of UQC, Stab on well. 0.0 0.0 20:42 21:42 Equalize pressure above Orbit valve and stroke open, Leave 500 PSI on open side of valve. Final SITP=1852 PSI. Shut master, jet stack and rig. 10113!2018 10/13/2018 0.60 DEMOB WELLPR CTOP P Unstab injector, Install night cap and 0.0 0.0 21:42 22:18 blow down stack, rig, and TT line 1o/13/2618 10/13/2018 1.20 DEMOB WHDBOP OTHR P Vac out stack, Run bore scope in BOP 0.0 0.0 22:18 23:30 1 stack 10/13/2018 10/14/2018 0.50 DEMOB MOVE RURD P Start workin rig down checklist 0.0 0.0 23:30 00:00 10/14/2018 10/14/2018 6.00 DEMOB MOVE NUND P Work rig down checklist - Nipple down 0.0 0.0 00:00 06:00 stack, RELEASE RIG 06:00 Page 37/37 ReportPrinted: 10/15/2018 ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01 L1-02 50-029-21514-62 Baker Hughes INTEQ Definitive Survey Report 19 October. 2018 BA ER I UGHES Ecompany ConocoPhillips LwNEs a ConocoPhilli' ps Definttive Survey Report Company ConocoPhillips(Alaske) Inc. Proposal I(upamk River Unit Site: Kupamk 31 Pad Well: 31WI Waltham: 3601 Design: 31-01 Project Kup suk River Unit, North Slope Alaska, United Stales Map $,a".: US Suite Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Z.. 04 Well 3WU Local Coardinaui Reference: Well 31-01 TVD Reference: 3601 C 71.00use (31411) MID Reference: 31-01® 71.00usft (3101) North Reference: True Survey calculation Method: Minimum Curvature Damhase: EDT 14 Masks Pmducarr n Well Position +W3 0.00 use Nonhing: Using geodetic scale factor +EI -W 0.00 use Setting: Position UnceftaiMy Longhude: 0.00 use Wellhead Elevation: Welihore 31AiL142 Magnetics Modal !lame sample Dam 13GM2019 Design 31-0111-02 Audit Notes: Veteran: 1.0 Phase: ACTUAL Vertical Section'. Oepth From )TVD) (-airy 71.00 W1I2016 Mean See Level Using Well Reference Point Using geodetic scale factor 6,007,265.50usR Lantude: 508,056.44us0 Longhude: usg Ground Level: Decfirutlon Dip Anole 16S5 60 93 Tie On Depth: 9,11699 eNl-S (Nsf) 0.00 +E4V (deft) 0.00 70° 25' 52.059 N 149° 56' 3.597 W 0.00 usn Field Strenoth (.7) 5],444 Direction 270.00 107191016 9:16:58PM Page 2 COMPASS 500014 Budd 85D ConocoPhillips ConocoPhillips Deflniti" Survey Report Compary. ConocoPhillips (Kaska) Inc. Local Loardinate Reference: Web 3101 Project: Kupamk River Unit ND Reference: awl@ 71.00usn(3101) a" Kupa uk 31 Pad MD Reference: awl @ 71.00usn (3141) Well'. 31-01 North Reference: Tree Wellbore: 31-01 Survey Calculation Memed: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey Program Dab Fre. To Survey survey (.R) (moth Survey(Wellbom) TOOT Name Deacripm.. Sbn Date End Dab 100.00 0,600.00 3"1(3101) GOT-MS Schlumberger GCT mullisnot 1/122001 8,680.00 8,767.41 31011-1O3 MW INC (314H 11O3) MWD�INO_ONLY MW INC ONLY FILLER 912512010 91252018 8797.13 9,116.39 3141 L1 O3 ISM (3W1 1-1O3) MWD MWD-Standad 912&2018 WHIMS 9,126.00 9,155]3 awl Ll-0 MW ING(31.O1 L1.02) MWD-INOONLY MWNINC ONLY FILLER 10110(2018 101102018 9.18].08 11,350.12 31011.1-02 SAM (31.011.1-02) MWD MWD-Standard 101192018 10113/2018 Survey ... _ ....... _ Map Map Memel MD !rte AL NO NO56 -Ni aHVI No- Eaehng OLS Semion Survey Tool Name AD60tat190 Ned) P) P) (--ft) loan) loan) (tan) (ftl n1. (91001 m 8,11639 98 43 945 05 6.3.60 6,2]468 3,625.99 4,717.37 6,010,916.22 512.12. ]69.42 11A7 -0]t]3] MWO(3) TIP 912600 9654 &26 6,344.59 6,273.59 3,635.43 4.71&81 6.010.925.66 512,]]9&5 8.04 -0]1&81 M INC_ONLY (4) KOP 9,156.33 9550 355.50 6.341.11 6,270.11 3,685.48 4]19.80 6,010,9:5.71 54,71.80 41.86 -0.71980 MND-MCONLY(4) IntaMolatedAaimuth 9,187.06 9748 34392 6,33]13 6,268.33 3.69545 471435 6.010,985V 512,]..33 3]49 4.714.36 MIND (S) 9,216.64 90.80 334.24 633319 6262.19 3,MM 4703.92 6,911,p12W 612.]558] 3284 4.]0392 uNuo(5) 9,246.96 9652 322.62 6,32910 6,259.18 3.748.31 4608.22 6,011039.50 512,74914 3&62 kSoLaa Meta, (5) 9,276.95 94.89 31937 6,326.19 6,255.19 3,769.92 4,86730 6,011060.c8 512719.60 40.99 {806.70 MWO(5) 9.305.09 06.25 ado" 6323.46 625245 3,788.16 4.6M.93 6,011 Man 512.899.82 34.75 .1,844.93 MWD(5) 9.33585 Sam 29347 6,32D.15 6,249AS 3,80106 4fi17,71 6.011090.9 51;666.59 23.16 -4,61]]1 MWD(5) 9,36518 96.25 10302 6.316.90 6,24590 3.0718] 4590.01 6.01110204 512,6418] 1.60 4590.01 MAD (5) a.m i 95.47 292.52 6,313.84 6.24284 3,82349 4,56255 6,011,113.53 512,61171 3.09 4,55255 MWD (5) 9,42543 9395 ...92 6,31143 6.240.43 3834.28 4,535.40 6011.12429 512.58]24 7.74 A535AD MWD(5) 9,455.83 9t L] 267.60 6,309.. 6.230.99 3,84434 4,50676 6011.134.32 512,558.59 12.58 4am76 MWD(5) 9,455.58 91.14 286.14 6.301 6,238,32 3,853. 4478.32 6011".1al 512533.14 595 4478.32 NINA) (5) 9,515.14 09.51 203.80 6,309.15 6,238.15 3,86969 4449.]] 6011,150.61 512,501.59 903 -044937 MVW(5) 9545. 9566 263.91 6,301 6.236.62 3867.58 4,420.69 6,011.15734 512 4M51 278 4,420.0 MMD (5) 9.575.14 8043 281.83 631..38 o.,M 3,67462 4,38100 6.011,164.38 51244322 66t -amn.40 MWD(5) 9.608.48 8&65 281.57 6311.23 6240.23 3,881.28 4,35816 6011,171.10 51241658 102 4,35036 NAND (S) 9637.31 Sam 279.95 6.31206 6,241.06 3,886.66 4.333.45 6,011,17645 512,38226 590 4.31945 vWD(5) 10/19,2018 3:16:58PM Paye3 COMPASS 500914 Budd 85D COnocoPhilllps ConocoPhillips Definitive Survey Report BI�IlRV O Company: ConocoPllMlps(Alaska) Inc. Local Corordinate Reference: Well 3WI Project: Kupamk River Unit TVD Reference: 3WIQ 71.00.ft(3141) Site: louparuk 31 Pad MD Reference: 314M @ 71.00use (31-01) We11: 31-01 Nonh Reference: True Wellborn: 31-01 Survey Calculation Method: Minimum Curvature Oesl9n: 3601 Database: EOT 14 Alaska Pmdmtbn Survey MO Inc Atl TVD Woes +NIS -Vm flny OLS 5 C6on NOMltly S -Mae') Survey Teot Name Annotation (deft) PI P) (use) (use) lune) (daln (to (It) I pp 9,666.90 8].5] 27603 6313.18 624219 3891 ]B 4, m, 25 fi,D111a10e 512.5,fi 669 -0,36125 MAID (5) 9.697.12 67.91 278.05 6,314.30 6243.30 3,89551 4,271.35 6,01i,16513 512,323.16 143 4.271.35 MD (5) BR7,29 8690 278.30 6,315.22 6,24122 3,89938 4,241.43 6,011,11169] 512,MM 6.69 4,241.43 ME) 9,]5].24 9963 275.55 6315.53 6,244.53 3,902.37 4211.64 B.011,19202 512,261.45 4.12 4211.84 MWD (5) 9)11688 9071 276.49 6,315.30 6244.30 3,905.22 4.18214 8,011.194.04 512,233.94 2.81 4182.14 MM (5) 9.81781 92.6 278.24 fi314.0 624363 anod92 4,15145 6,01919650 612 20125 9.90 4,15145 MWD(6) 9,84]]9 91.00 282N fi313.57 624257 3,914.21 412136 5.11,203.76 5121"'Aii 1290 4,121% MYW(5) 9,86168 9132 285.10 6.312.59 6,241.59 3,922.9 4089.04 6,011,211.70 512,140.83 9,04 4ON.4 M%N3(5) 90649 9128 26623 6,31196 6,240.90 3.923.0 4,20336 6.011,219.35 512,11515 11.63 4.63.38 MJUD(5) 99311.49 90.10 28739 8,311.59 6,240,59 3.939.03 4,0%.80 6,011,228.49 51200.59 462 4.034.0 MND (5) 9,07.01 8966 20]36 6,311,63 6,2b63 3.S47 55 4,00]58 6,011,236.90 512.059.36 1.83 4,00759 MND(6) 9,05.07 9060 28777 6311.55 6,240.55 3,956.01 3.90.04 6,01124542 512D32.60 392 190964 NAND (5) 10,02]]3 9083 285.00 6311.12 624012 3,90 .50 3,9495(1 6.011,25407 512,01.35 5.44 3949.59 MND(5) 10057 28 9138 2M.40 6,310.55 6239.55 3,97314 3,92132 6,011,mWm 511.9,20 2.30 3.921.23 MWD (5) 10,007.17 eY/9 286.70 6,309.46 6238.40 3,902.27 3,0WN 6011,27157 Si1944.34 469 -3.092.59 MWD (5) 10.118.0 91.26 28209 630637 623].3] 3,99126 3,8630] 6,01130.53 511,91401 60 1963.07 MD (5) 10.148.15 89.29 288.10 6.30884 6337,N 4.00.36 3,834.38 6.011309.E0 51180]1 7.53 41.B%.311 "D (5) 10.17].53 09.14 28642 6,30.0 6,237,66 4,009.57 3,8045 6,011,298.70 51185610 1.13 4,006.45 MWD(5) 10.20294 07.63 2(e69 6309.43 6,23643 4,018.73 3,7]].50 6,011,307.91 511.829.= 687 3,7]150 MWD(5) 29.23665 0717 284.38 6,310.73 6339.73 4,026.94 3.747.94 6,011,316.09 511799.65 8.02 3747.94 101141)(5) 10,270.55 ... 28378 6,312.37 6,241.37 4.034.68 3.]1].04 6011,3230D 511,]60.]5 1.97 3)1].04 MND(6) 10,29541 00.16 282,84 6.31344 6.24244 4.NO,M 3,692.86 6011.329.45 5117..% 674 -3,692.66 MND (5) 10,325.13 8745 28340 6.31457 6,24358 4.47,05 3,663.92 6011,333.10 511,715.63 350 4,0392 MAID (5) 1635388 89.23 28078 6.315.41 6244.41 4053.07 3.635.83 601134209 511.607.52 11.01 363583 MAID (5) 10,387.35 9126 27753 6.31&& 6.2..26 4,05640 3,60279 6,011,30.38 511.85440 11.45 3,602.]9 MND(5) 10,413.29 9325 2740 6,31434 6.2Q,N 4,0130 3.576@ 6,o1i,Zi50,M 51162662 1281 -3,57692 MWO(5) 10,.7.51 9320 2730 6,31232 6241.32 4,.% 364294 6.011362.48 511594.0 5.18 154294 MD (5) 10,477.31 966.0 269.87 6,311.0 6,240.47 4,06432 3.5139 601135321 51156407 15.0 41.513.17 MD (5) 10508,21 8579 WT..0 6,312.59 6.24159 4,05371 348231 60H.3520 511534.01 15.30 3,48231 MWD(5) 10.530.75 83.67 20.02 6,315.34 0,24434 4,01.70 3,451,96 6011.35058 5115010 11.60 3,4510 MWD(5) 1056619 84.13 man 6,318.21 6,247,21 4,050.38 3ANB0 6,011,347,9 5114]B.W 140 3342486 MWD(5) 10/1911018 3: 1658M Pa0e4 COMPASS 500014 Budd 850 ConoeoPhillips lbqk� • Cbnoc Phllfips Definitive Survey Report Comparry: ConO lai111pe(Alaska) Inc. Local Coanllrob Refannce: Mll 3"1 P.J.M. Kupamk Ramr Unit ND Refinance: 31-01® 71.00usR(3401) She: Kupamk 31 Pad MD Reference: 31411@71.00ush(3141) seep: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method Minimum Curnitu, Design: 3141 Database. EDI 14 Alaska Production Survey Map Map Vertical MO Irc Ab NO NOSS ♦WS +6-W Alarming Alarming Eas11n0 Seggryey Tool Name Annotation (usR) 19 (1) (UM" ai lush) loop) Vi) rt1 I ft) 10596.% 83.59 25819 6.321.]] 6250]] 4052.85 3394.03 fi0111134t 61 51111C4fi.55 ' 1023 ?394.03 "D (5) I 10,62]2] 8325 25,26 6,325,31 6,25451 4.045.69 3,36&112 6,011,33442 511.41235 1150 3,3f562 MWD (5) 10,07.0 83.82 250.50 6,320,% 6,251 4,0311.50 3,336.69 6,011.325.211 511,388,43 1237 433669 "D (5) 10.687.60 85.48 246,5 6,331,74 6,250.74 4.025.61 3,350.0 6.011.314.28 511,3%,P. KM 430903 MWD(5( 10,]18,8] 88.10 243.91 fi333.49 6,26249 4.01257 3,260]] 6.011.301.21 511,33254 1190 4.281 MW➢(5( I 10,25010 09.75 24117 6,33407 6263.07 3,99a,P 325203 6,1)1 511,304,86 1024 425305 MWD(5) 10,701 9009 237.88 6334.12 626112 3,902.62 3,226.63 6.Ot1P120 511,278." 10]0 4.M&63 eau (6) 10,01153 90.45 231.99 6.33397 6,262.97 3,965.40 3,21)116 6,011,253.95 51125299 1271 y2T.16 MhD(5) 10,839A7 045 Mai 6,333.99 IsMAKO 3,946.13 3,179.20 6.01123666 51 16.02 -0.179X34 MAID(5) 10.81 88.65 22371 6.334.51 &20.7.51 3.11 3.155.34 6,011.21607 511.08.M 18.99 3.155.% MAo(5) 10.%0.47 81 21282 6.250.82 62ei 3,904.19 3,13].00 601"Milm 511.101 20.33 3.137.06 MAD (5) I 10,%0.32 92.15 215.06 6,334.41 6.26341 311 10 3.119.33 601116&% 511,1719 1216 3,11933 MD (5) � 10961.51 9055 207.31 6,33350 6.02.67 3,85353 3,103.20 6011,141.50 511,155.9 25.36 -0,134.20 MD (5) ! 10,50011 91.78 20&92 6.31 6,02.09 3,80.31 3,%9.R 6011,116.]6 511.14177 208 3,C09.R MWD (5) 11,DM.49 91.5, 213.24 6,33222 6,01.22 3,802.31 3,D]4.% 6.011.090.74 51110,08 1424 3,07485 NOW (5) 11M i 90.50 2120 6,331.6) fi250,63 3.]]0.24 3,05/,04 60110%,% 51115010 13.04 3857.04 WD (6) j 11,0800 88]1 219.51 6,331.]6 6,25016 3.75.55 303320 6,011,Mlai 511,0%.36 1016 403&20 MAD (6) 11,11041 87.91 222.015 6Miss 6,0185 3,731.69 3,01655 601100,07 511,0]0% 884 -0,018.55 MWU(5) 11.141% 87,85 20.61 6333.70 6,02.70 3.709.60 2997,35 6.010,997.87 51100..0 11,58 -0.98235 MrW(5) 11,17039 MAO 22880 6334.02 603.02 3.68969 29]5.84 6.010.976.03 511,027.99 1D.% -2.97584 MAD(S) 11,201,49 111 M.63 630.96 6264W 3,670.01 2,951,79 fi010,95633 511,003,97 1237 -2,951]9 MAD (5) 1123021 MAD 236,20 6.336,84 6,2%.84 3,03.31 2,928." 6,010,00.61 510,91 13.02 -2,928." MAO(5) 110103 0585 234% 6.33620 6,0226 3,M60 2,902.58 6,010,824.87 510.95.81 11.31 -29@.59 MAD(5) 11,29011 0601 Me, 6.340.34 180934 3,621.54 2.677]4 6,010,950,89 510,929.98 6.13 -2.0]]24 MD (5) 1131966 86.19 24379 6.0235 6271,36 3,60)]2 2051]6 6,010,8%,94 510.934@ 1335 3,&510 MAO(5) 11350.12 8680 247.43 6.3".1,9 6.273.19 3,596.17 2,82407 6.010,81 610,0768 12.15 -2.82407 MD (6) 1140000 86.0 24243 6.346.89 6,275.89 3,5]fi05 2,]]8.03 60ID,%419 510,030.39 O.W -277800 PROJECTED to TO IW19MI8 3:16:59PM Pa's COMPASS 500014 Sued 80 WMA F16 BAKER HUGHES To: Date: November 6, 2018 Abby Bell AOGCC 333 West 70' Ave, Suite 100 Anchorage, Alaska 99501 From: 2.18089 29975 Letter of Transmittal Michael Soper Baker Hughes INTEQ 795 East 90 Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3I-OlLlPB1 3I-OILl-03 3I-OIL1-04 3I -01L1-05 31-OlLl 31-OIL1-02 (6) Total prints RECEIVED NOV 0 7 2018 AQGCC Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Project Engineer Michael. Soper@BakerHughes.com ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01 L1-02 50-029-21514-62 Baker Hughes INTEQ Definitive Survey Report 19 October, 2018 BA ER I UGHES a GE company 29975 Project ConocoPhillips ConocoPhillips Definitive Survey Report System Datum: Company: ConocoPhillips (Alaska) Inc. Local Coordinate Reference: Well 31-01 Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Project Kuparuk River Unit, North Slope Alaska, United Slates Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 31-01--._.__. Well Position +NI -S 0.00 usft Northing: +E/.W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 31-0lLl-02 Magnetics Model Name Sample Date BGGM2018 9/1/2018 Design 31-01L1-02W��m—�_W Audit Notes: Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,007,285.50usft 508,056.44usft usft Declination (1) 1695 Version: 1.0 Phase: ACTUAL Tie On Depth: 9,116.39 Vertical Section: Depth From (TVD) +N/ -S (usft) (usft) i 71.00 0.00 Latitude: Longitude: Ground Level: Dip Angle (I 80 93 +E/ -W Direction (usft) (1) 0.00 270.00 700 25' 52.059 N 1490 56'3,597 W 0 00 usft Field Strength oT) 57 444 10/192018 3: 16.58PM Page 2 COMPASS 5000. 14 Build 85D ConocoPhillips9tN FS ConocoPhillips Definitive Survey Report 9 Company: Project: Site: Well: Wellbore: Design: Survey Program ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 31 Pad 31-01 31-01 31-01 Date Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 31-01 31-01 @ 71.00usft (31-01) 31-01 @ 71.00usft (31-01) True Minimum Curvature EDT 14 Alaska Production From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 100.00 8,600.00 31-01 (31-01) GCT -MS Schlumberger GCT multishot 1/12/2001 8,680.00 8,767.41 31-01LI-03 MWD-INC(31-011-1-03) MWD -INC -ONLY MWD -INC -ONLY FILLER 9/25/2018 9/25/2018 8,797.13 9,116.39 31-0111-03MWD(31-0111-03) MWD MWD -Standard 9/25/2018 9/29/2018 9,126.00 9,156.33 31-01LI-02 MWD -INC (31-0111-02) MWD -INC -ONLY MWD -INC -ONLY -FILLER 10/10/2018 10/10/2018 9.18208 11,350.12 31-01 L1-02 MWD (31-0111-02) MWD MWD- Standard 10/10/2018 10/13/2018 Survey 101192018 3: 16.58PM Page 3 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +EI -W DLS (usft) (1) n (usft) (usft) (usft) (usft) Northing Easting (°/100') Section Survey Tool Name Annotation (ft) (ft) (ft) 9,116.39 96.43 9.05 6,345.68 6,274.68 3,625.99 4,717.37 6,010,916.22 512,769.42 11.47 4,717.37 MM (3) TIP 9,126.00 96.54 8.28 6,344.59 6,273.59 3,635.43 4,718.81 6,010,925.66 512,770.85 8.04 -0,718.81 MWD-INC_ONLY (4) KOP 9,156.33 96.59 35550 6,341.11 6,270.11 3,665.48 4,719.80 6,010,955.71 512,77180 41.86 4.719.80 MWD-INC_ONLY (4) Interpolated Azimuth 9,187.08 97.48 343.92 6,337.33 6,266.33 3,695.45 4,714.36 6,010,985.67 512,766.33 37.49 4,714.36 MWD (5) 9,216.64 98.60 334.24 6,333.19 6,262.19 3,722.76 4,703.92 6,011,012.97 512,755.87 32.64 4,703.92 MWD (6) 9,246.95 96.52 322.62 6,329.18 6,258.18 3,748.31 4,688.22 6,011,038.50 512,740.14 38.62 4,688.22 MWD (5) 9,276.95 94.89 310.37 6,326.19 6,255.19 3,769.92 4,667.70 6,011,060.08 512,719.60 40.99 4,667.70 MM (5) 9,305.09 96.25 300.64 6,323.45 6,252.45 3,786.16 4,644.93 6,011,076.30 512,696.82 34.75 4,644.93 MWD (5) 9,335.85 96.06 29347 6,320.15 6,249.15 3,806.06 4,617.71 6,011,090.17 512,669.59 23.18 4,617.71 MWD (5) 9,366.18 9625 293.02 6,316.90 6,245.90 3,811.97 4,590.01 6,011,102.04 512,641.87 1.60 4,590.01 MM (5) 9,396.11 9547 29252 6,31384 6,24284 3,82349 4,562.55 6,011,113.53 512,614.41 3.09 4,562.55 MWD(5) 9,42543 93.96 290.82 6,311.43 6,240.43 3,834.28 4,535.40 6,011,124.29 512,587.24 7.74 4,53540 MWO(5) 9,455.83 9147 28788 6,309.99 6,238.99 3,844.34 4,506.76 6,011,134.32 512,558.59 12.66 4,506.76 MM (5) 9,485.58 91.14 286.14 6,309.32 6,238.32 3,853.04 4,478.32 6,011,142.99 512,530.14 5.95 4,478.32 MWD (5) 9,515.14 89.51 283.88 6,309.15 6,238.15 3,860.69 4,449.77 6,011,150.61 512,501.59 9.43 4,449.77 MWD (5) 9,545.09 88.68 283.81 6,309.62 6,238.62 3,867.86 4,42069 6,011,157.74 512,472.51 2.78 4,420.69 MWD (5) 9,575.14 88.43 281.83 6,310.38 6,239.38 3,874.52 4,391.40 6,011,164.38 512,443.22 6.64 4,39140 MWD (5) 9,608.48 W65 28157 6,311.23 6,240.23 3,881.28 4,358.76 6,011,171.10 512.410.58 1.02 -4,358.76 MWD (5) 9,637.31 88.% 279.95 6,31206 6,241.06 3,886.66 4,33045 6,011,17645 512,38226 598 -4,330.45 MW (5) 101192018 3: 16.58PM Page 3 COMPASS 5000.14 Build 85D ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 31-01 Project: Kuparuk River Unit TVD Reference: 31-01 @ 71.00usft (31-01) Site: Kupamk 31 Pad MD Reference: 31-01 @ 71.00usft (31-01) Well: 31-01 North Reference: True Wellbore: 31-01 Survey Calculation Method: Minimum Curvature Design: 31-01 Database: EDT 14 Alaska Production Survey Annotation BA%H'1 10/19/2018 3: 16:58PM Page 4 COMPASS 5000.14 Build 85O Map Map Vertical MD Inc Azi TvD TVDSS -NI-S +El -W Northing Easting OLS Section lust[) V) (1) (usft) (usft) (usft) (usft) (°1100') Survey Tool Name (ft) (ft) (ft) 9,666.90 87.57 278.03 6,313.18 6,242.18 3,691.28 4,301.25 6,011,181.04 512,353.06 669 4,301.25 MWD(5) 9,697.12 87.91 278.06 6,314.38 6,243.38 3,895.51 4,271.35 6,011,185.23 512,323.16 1.13 4,271.35 MWD (5) 9,72729 88.90 276.30 6,315.22 6,244.22 3,899.28 4,241.43 6,011,188.97 512,293.23 6.69 4,24143 MWD(5) 9,757.24 89.88 275.55 6,315.53 6,244.53 3,902.37 4,211.64 6,011,192.02 512,263.45 4.12 4,21164 MWD (5) 9,786.88 90.71 275.49 6,315.38 6,244.38 3,905.22 4,182.14 6,011,194.84 512,233.94 2.81 4,182.14 MWD(5) 9,817.81 9206 278.24 6,31463 6,243.63 3,908.92 4,151.45 6,011,198.50 512,203.25 9.90 4,151.45 MWD(5) 9,847.79 92.00 282.11 6,313.57 6,242.57 3,914.21 4,121.95 6,011,203.76 512,173.76 12.90 4,121.96 MWD(5) 9,881.68 91.32 285.10 6,312.59 6,241.59 3,922.17 4,089.04 6,011,211.70 512,140.83 9.04 4,089.04 MWD (5) 9,908.49 91.29 288.22 6,311.98 6240.98 3,929.85 4,063.36 6,011,219.35 512,115.15 11.63 4,06336 MWD (5) 9,938.49 90.18 287.39 6,311.59 6,240.59 3,939.03 4,034.80 6,011,228.49 512,086.59 4.62 4,034.80 MWD (5) 9,967.01 89.66 287.36 6,311.63 6,240.63 3,947.55 4,007.59 6,011,236.98 512,059.36 1.83 4,007.59 MWD (5) 9,995.07 90.68 287.77 6,311.55 6,240.55 3,956.01 $,980.84 6,011,245.42 512,032.60 3.92 -3,980.84 MM (5) 10,027.73 90.63 286.00 6,311.12 6240.12 3,965.50 3,949.59 6,011,254.87 512,001.35 5.44 -3,949.59 MM (5) 10,057.28 91.38 286.40 6310.55 6,239.55 3,973.74 3,92122 6,011,263.08 511,972.97 2.30 -3,921.22 MWD (5) 10,087.17 92.79 286.78 6309.46 6,238.46 3,982.27 3,89259 6,011,271.57 511,944.34 4.89 -3,892.59 MWD (5) 10,11805 91.26 287.09 6,308.37 6,237.37 3,991.26 3,86307 6,011,280.53 511,914.81 5.06 -3,863.07 MWD (5) 10,148.15 89.23 288.10 630824 6,237.24 4,000.36 3,834.38 6,011,289.60 511,886.11 7.53 -3,834.38 MM (5) 10,177.56 89.14 288.42 6,30866 6,237.66 4,009.57 3,806.45 6,011,29878 511,858.18 1.13 -3,806.45 MWD (5) 10,207.94 87.97 285.69 6,30943 6,238.43 4,018.73 3,777.50 6,011,30791 511,829.22 6.87 -3,777.50 MM (5) 10,238.65 87.17 284.36 6,31073 6,239.73 4,026.94 3,74794 6,011,316.09 511,799.65 802 -3,747.94 MWD(5) 10,270.55 86.93 283.78 6,312.37 6,241.37 4,03469 3,71]04 6,01132380 511,768.75 1.97 -3,717.04 MM (5) 10,295.41 88.16 282.64 6,31344 6,24244 4,040.36 3,692.86 6,011,329.45 511,744.56 6.74 -3,692.86 MM (5) 10,325.13 87.45 283.40 6,314.57 6,243.58 4,047.05 3,663.92 6,011,336.10 511,715.62 3.50 -3,663.92 MWD (5) 10,353.88 89.23 280.78 6,315.41 6,244.41 4,053.07 3,635.83 6,01134209 511,687.52 11.01 -3,635.83 MM (5) 10,38735 9126 277.53 6,315.26 6,244.26 4,058.40 3,602.79 6,011,347.38 511,654.48 1145 -3,602.79 MWD (5) 10,413.39 93.25 274.85 6,314.24 6,243.24 4,061.20 3,576.92 6,011,350.16 511,628.62 1281 -3,576.92 MWD (5) 10,447.51 93.20 273.08 6,312.32 6,241.32 4,063.56 3,542.94 6,011,352.48 511,594.64 5.18 4,542.94 MWD (5) 10,477.31 90.06 269.87 6,311.47 6,24047 4,064.32 3,513.17 6,011,353.21 511,564.87 15.06 -3,513.17 MWD (5) 10,508.21 8579 267.84 6,312.59 6,241.59 4,063.71 3,482.31 6,011,352.56 511,534.01 15.30 -3,482.31 MWD (5) 10,538.75 83.87 264.82 6,315.34 6,244.34 4,061.76 3,451.96 6,011,350.58 511,503.66 1168 -3.451.96 MWD (5) 10566.19 84.13 260.95 631821 6,24721 405838 3,42488 6011,347.17 511,47660 14.06 -3424.88 MP (5) Annotation BA%H'1 10/19/2018 3: 16:58PM Page 4 COMPASS 5000.14 Build 85O ConocoPhillips Company: ConocoPhillips (Alaska) Inc. Project: Kuparuk River Unit Site: Kuparuk 31 Pad Well: 31-01 Waltham: 31-01 Design: 31-01 Survey ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 31-01 31-01 @ 71.00usft (31-01) 31-01 @ 71.00usft (31-01) True Minimum Curvature EDT 14 Alaska Production Annotation 10/19/2018 3A6:58PM Page 5 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +NI -S +E/ -W Northing Easting DLS Section (usft) V) (1) (usft) (usft) (usft) (usft) ('1100') Survey Tool Name (ft) (ft) (ft) 10,596.96 8258 25819 6,32177 6,25077 4,052.85 3,394.83 6,011,341.61 511,446.55 1023 -3.394.83 MWD(5) 10,627.27 83.25 254.26 6,325.51 6,254.51 4,045.69 3,365.62 6,011,33442 511,417.35 13.06 -3,365.62 MWD(5) 10,657.83 83.82 250.50 6,328.96 6,257.96 4,036.50 3,336.69 6,011,325.20 51138843 12.37 3,336.69 MWD (5) 10,687.69 85.48 246.54 6,331.74 6,260.74 4,025.61 3,309.03 6,011,314.28 511,360.79 14.33 3,309.03 MWD (5) 10,718.87 88.10 243.91 6,333.49 6,262.49 4,012.57 3,280.77 6,011,301 21 511,332.54 11.90 -3,280.77 MWD (5) 10,750.10 89.75 241.17 6,33407 6,263.07 3,998.17 3,253.06 6,011,286.78 511,304.86 10.24 -3,253.06 MWD (5) 10,780.78 90.09 237.88 6,334.12 6,263.12 3,982.62 3,226.63 6,011,271.20 511,278.44 10.78 -3,22663 MWD (5) 10,811.53 90.46 233.99 6,333.97 6,262.97 3,965.40 3,201.16 6,011,253.95 511,252.99 12.71 3,201.16 MWD (5) 10,839.47 8945 229.63 6,333.99 6,262.99 3,948.13 3,179.20 6,011,236.66 511,231.06 16.02 -3,179.20 MWD(5) 10,870.92 88-65 22371 6,334.51 6,263.51 3,926.56 3,156,34 6,011,215.07 511,208.22 18.99 3,156.34 MM (5) 10,900.47 89.79 217.82 6,334.92 6,263.92 3,904.19 3,137.06 6,011,192.68 511,188.98 20,30 3,137.06 MWD (5) 10,930.32 92.15 215.W 6,33441 6,263.41 3,880.18 3,119.33 6,011,168.66 511,171.27 12.16 -3,119.33 MM (5) 10,961.51 90.55 207.31 6,333.67 6,262.67 3,853.53 3,103.20 6,011,141.99 511,155.17 25.36 3,103.20 MM (5) 10,990.11 91.78 208.92 6,333.09 6,262.09 3,828.31 3,089.72 6,011,116.76 511,141.72 7.08 3,089.72 MWD (5) 11,020.49 91.50 213.24 6,332.22 6,261.22 3,802.31 3,074.05 6,011,090.74 511,126.0 14.24 3,074.05 MM (5) 11,049.97 9080 217.26 6,331.63 6,260.63 3,776.24 3,057.04 6,011,066.66 511,109.10 13.84 3,057.04 MWD (5) 11,03020 88.71 219.51 6,331.76 6,260]6 3,754.55 3,038.28 6,011,042.95 511,090.36 10.16 -3,038.28 MVID(5) 11,11041 87.91 222.06 6,332.65 6,261.65 3,731.69 3,018.55 6,011,020.07 511,070.66 8.84 -3,018.55 MWD (5) 11,141.05 87.85 225.61 6,333.78 6,262.78 3,709.60 2,99735 6,010,997.97 511,049.48 11.58 -2,997.35 MWO(5) 11,170.39 88.10 228.80 6,334.82 6,263.82 3,689.69 2,975.84 6,010,978.03 511,027.99 10.90 -2,975.84 MWD(5) 11,20149 8770 232.63 6335.96 6,264.96 3,670.01 2,951.79 6,010,958.33 511,003.97 12.37 -2,951.79 MWD (5) 11,230.21 88.80 23620 6,336.84 6,265.84 3,653.31 2,92844 6,010,941.61 510,980.64 13.00 -2,92844 MWD (5) 11,261.03 85.85 238.06 6,338.28 6,267.28 3,636.60 2,902.59 6,010,924.87 510,954.81 11.31 -2,902.59 MWD (5) 11290.11 86.01 239.84 6,340.34 6,269.34 3,621.64 2,877.74 6,010,909.89 510,929.98 6.13 -2,877.74 MWD (5) 11,31966 86.19 243.79 6,342.35 6,271.35 3,607]2 2,851.76 6,010,895.94 510,904.02 13.35 -2,851.76 MWD (5) 11350.12 86.90 24743 6,344.19 6,273.19 3,595.17 2,824.07 6,010,883.36 510,876.35 12.15 -2,824.7 MWD(5) 11,400.03 86.90 24743 6,346.89 6,275.89 39605 2,77808 6,010,864.19 510,830.38 0.00 -2,77808 PROJECTED to TO Annotation 10/19/2018 3A6:58PM Page 5 COMPASS 5000.14 Build 85D BA ER Qi PRINT DISTRIBUTION LIST F1UGHES a GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 31-O1L1-02 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska 118039 29951 ie sign and return one copy of this transmittal form to: DcoPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) G Street. norage, Alaska 99510 LOG TYPE GR - RES LOG DATE October 6, 2018 AUTHORIZED BY Patrick Rider EMAIL Patrick Rideronbakerhughes.corn TODAYS DATE October 31, 2018 Revision STATUS Final Reptacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. SOX) PERSON ATTENTION V 1 BP North Slope. EOA, PROC, PRB-2010fce 1091 D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 Conoco Phillips Alaska Inc. Atm: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 3 ' ExxoaMubil,AIasIw Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4'IState of Alaska -AOGCC ,Atm: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 FIELD I FINAL CD/DVD FINAL PRELIMLOGS (las, dlis,META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTSI # UF tKIN 16# OF COPIES # OF COPIES # OF COPIES 4 4 4 is ea., 0 1 0 1 0 1 0 1 0 0 i o 0 5 DNR -Division ofOil&Gas 0 0 1 0 1 Attn: Resource Evaluation .550 West 7th Avenue, Suite 1100 Anchorage, Alasla 99501 Le Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. 0 0 0 Petrotechnical Data Center, LR2-1 1900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 3 0 0 THE STATE 01ALASKA GOVERNOR BILL WALKER William R. Long Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3I-OIL1-02 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-089 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.alaska, gov Surface Location: 344' FSL, 179' FWL, SEC. 31, TI 3N, R9E, UM Bottomhole Location: 1327' FNL, 2071' FWL, SEC. 31, T13N, R9E, UM Dear Mr. Long: Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit 185-307, API 50-029-21514-00- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair J DATED this day of August, 2018. STATE OF ALASKA AL, A OIL AND GAS CONSERVATION COMM ON PERMIT TO DRILL 20 AAC 25.005 JUL 2 0 2018 i 1 a. Type of Work: tb. Proposed Well Class. Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is. proposed for. Drill [:1 Lateral ❑� Stratigraphic Test El Development - Oil ❑� ' Service - Winj F_] Single Zone ❑� Coalbed Gae'"u Gas Hydrates ❑ Redrill❑ Reentry❑ Exploratory - Oil ❑ Development - Gas❑ Service -Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑✓ . Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 5952180 Kuparuk Riv Unit 31-01 Li -02 3. Address: 6. Proposed Depth:(: G 2-' 3 12. Field/Pool(s): PO Box 100360 Anchorage, AK 99510-0360 MD: 11,925 ' TVDS -' 6212 Kuparuk River Kuparuk River Oil 4a. Location of Well (Governmental Section): 7. Property Designation: / o Surface: 344' FSL, 179' FWL, Sec. 31, T13N, l UM ADL 25521 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Sp Date: '71to l9 1239' FNL, 564' FEL, Sec. 31, T13N, R9E, UM LOMS 83-130 8/ 018 Total Depth: 9. Acres in Property: 14. Distance to barest Property: VT 1327' FNL, 2071' FWL, Sec. 31, T13N, R9E, UM 2555 18,990' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 71 15. Distance to Nearest Well Open Surface: x- 508056 y- 6007286 Zone- 4 GL / BF Elevation above MSL (ft): 40 to Same Pool: 513' (31-03) 16. Deviated wells: Kickoff depth: 9200 feet • 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 102 degrees Downhole: 5456 Surface: 4829 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.6# L-80 ST -L 2840 9085 11,925 ' Un -Cemented 19, PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured). 9030 6542 N/A 8919 6460 8782 Casing Length Size Cement Volume MD TVD Conductor/Structural 73' 16" 274 Sx CS II 104' 104' Surface 4315' 9-5/8" 1650 Sx AS III & 320 Sx Class G 4346' 3304' Intermediate Production 8986' 7" 300 Sx Class G & 175 Sx AS 1 9010' 6528' Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 8734-8760,8770-8798 6326-6345,6352-6373 Hydraulic Fracture planned? Yes❑ No ❑� 20. Attachments: Property Plat ❑ Drilling Program v. togPam Shallow Hazard lentse Divertter Sketch B Seabed Report B Drilling geFlu d Pr e 20 AAC 25.050 requiremlot 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: William R. Long Authorized Name: William R. Long Contact Email: William.R.LonclaCOP.com Authorized Title: Staff CTD E gine Contact Phone: 907-263-4372 /y X-4 Authorized Signature: Date: Commission Use Only Permit to Drill 'rj—'b API Number: ,} Permit Approval See cover letter for other Number: .LJ 50-(/Z�"Z-�� �(?�� Date: 11requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, as hydrates, or gas contained in shales: Other: Samples req'd: Yes ❑ No Mud log req'd: Yes ❑ Nov B o P rest -t-'o 49 ea 'P5' -'J H12S measures: Yes 0?" No Directional svy req'dYes [o No E] /tn9n v9l anr fJcl CVG Vt �l r } Z Inclination -only svY req'd: Yes❑ NOVd SjpacingC25e�tln req'd: Yes❑ No[K V&r/q P7 e- b /" c2S 6 o2 Post initial injection MIT req'd: Yes❑ NorPr /S 7',0 2%V-lcl�/�of��ur:�i iv be' ariy pvl/ i't 121av9 Vl-h r P4 rt1/7 I / - APPROVED BY f Approved by: COMMISSIONER THE COMMISSION Date: 1?J 1'_J 1/77Th /'i/ �f /ZQ` /�f Submit Fonn and Form 10-001 Revised 5/2017 s ermrt is va id foriii rptt(. Jtl1b 4at�oftpproval per 20 AA� 05 gi ) ftachments in Duplicate (l' 111 _ I N 'A L /Y P 7 y'illqo ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 July 20, 2018 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the KRU 31-01 (PTD# 185-307) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin in August 2018. The objective will be to drill sig laterals, KRU 31-01 L1, 31-011-1-01, 31-011-1-02, 31-01 L1-03, 31-011-1-04, and 31-01 L1-05, targeting the Kuparuk A -sand interval. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20- AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01L1-05 - Detailed Summary of Operations - Directional Plans for 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-01L1-05 - Current wellbore schematic - Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-263-4372. Sincerely, William R. Long Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 31-011-1, 31-01 L1-01, 31-01 L7-02, 31-01 L1-03, 31-01 L1-04, and 31-01 L1-05 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................................. 2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3))..................................................................................-............................................................2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 7. Diverter System Information.......................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(7))...................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning................................................................................................................................................................6 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 7 (Requirements of 20 AAC 25.050(b)) ............................ -.................................................... ....................... ............................................. 7 16. Attachments....................................................................................................................................7 Attachment 1: Directional Plans for 31-01 L1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-01L1-04, and 31-01L1-05 laterals. .........................................................................................................................................................................................7 Attachment 2: Current Well Schematic for 31-01.............................................................................................................7 Attachment 3: Proposed Well Schematic for 31-01 L1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-0111-04, and 31-01 Lt -05 laterals.............................................................................................................................................................................7 Page 1 of 7 June 27, 2018 PTD Application: 31-011-1, 31-011-1-01, 31-01L1-02, 31-011-1-03, 31-011-1-04, and 31-0l Ll -05 1. Well Name and Classification (Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(6)) The proposed laterals described in this document are 31-011-1, 31-011-1-01, 31-01L 1 -02, 31-011-1-03, 31-011-1-04, and 31-01 L1-05. All laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 forms for surface and subsurface coordinates of each of the laterals. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4900 psi. Using the maximum formation pressure in the area of 5456 psi at the datum in 3N-05 (i.e. 16.7 ppg EMW), the maximum potential surface pressure in 31-01, assuming a gas gradient of 0.1 psi/ft, would be 4829 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 31-01 was measured to be 3943 psi at the datum (12.1 ppg EMW) on 5/3/2018. The maximum downhole pressure in the 31-01 vicinity is the 3N-05 at 5456 psi at the datum or 16.7 ppg EMW. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) No specific gas zones will be drilled; gas injection has been performed in this area, so there is a chance of encountering gas while drilling the 31-01 laterals. If significant gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(0)) The major expected risk of hole problems in the 31-01 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 31-01 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 7 June 27, 2018 PTD Application: 31-011-1, 31-011-1-01, 31-011-1-02, 31-011-1-03, 31-011-1-04, and 31-011-1-05 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 31-011-1 10,650 11,900 6318 6225 2V 4.7#, L-80, ST -L slotted liner; Surface 104 1640 670 Surface aluminum billet on to 36 J-55 BTC Surface 4346 2%", 4.7#, L-80, ST -L slotted liner; 31-01 L1-01 9200 12,250 6281 6290 aluminum billet on to J-55 BTC Surface 9010 Surface 2V, 4.7#, L-80, ST -L slotted liner; 31-011-1-02 9085 11,925 6282 6212 aluminum billet on to EUE8rd Mod Surface 8747 Surface 6336 2W, 4.7#, L-80, ST -L slotted liner; 31-0l Ll -03 10,100 12,000 6225 6204 aluminum billet on to 2%", 4.7#1 L-80, ST -L slotted liner; 31-011-1-04 9300 12,000 6258 6232 aluminum billet on to 2%"3 4.7#, L-80, ST -L slotted liner; 31-011-1-05 8725 123050 6248 6188 deployment sleeve on to Existing Casing/Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded Surface 104 Surface 104 1640 670 Surface 9-5/8" 36 J-55 BTC Surface 4346 Surface 3305 3520 2020 Production 7" 26 J-55 BTC Surface 9010 Surface 6528 4980 4320 Tubing 3-1/2" 9.3 L-80 EUE8rd Mod Surface 8747 Surface 6336 10,160 10,540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Water based Power -Vis milling fluid (8.6 ppg) — Drilling operations: Water based Power -Pro drilling mud (8.6 ppg). This mud weight may not hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The 31-01 contains a downhole deployment valve allowing deployment of tool strings and liner without pumping kill weight fluid. If the valve does not hold, BHA's will be deployed using standard pressure deployments and the well will be loaded with 12.1 ppg NaBr completion fluid in order to provide formation over -balance and maintain wellbore stability while running completions. If higher formation pressures are encountered the completion brine will be weighted up with sodium bromide or potassium formate. Page 3 of 7 June 27, 2018 PTD Application: 31-01L1, 31-01L1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-01Ll-05 Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5000 psi rated coiled tubing pack off and MPD choke..BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 31-01 laterals we will target a constant BHP of 12.1 EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 31-01 Window (8728' MD, 6322' TVD) Usinct MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 3I-01 is a Kuparuk producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize laterals to target the Kuparuk sands to the west and north of the existing 3I-01 wellbore. The laterals will increase throughput and recovery from a potentially sheltered corner of a fault block. A recent rig workover installed tandem wedges to facilitate cutting a window with CTD. Prior to CTD operations E -line will set an inner wedge in the tandem wedge. CDR3-AC will mill a window in the tubing and casing using the tandem wedge like a whipstock. Page 4 of 7 June 27, 2018 Pumps On 1.8 bpm) Pumps Off Formation Pressure 12.1 3978 psi 3978 psi Mud Hydrostatic 8.6 2827 psi 2827 psi Annular friction i.e. ECD, 0.080 sifft 698 psi 0 psi Mud + ECD Combined no chokepressure) 3525 psi underbalanced -453psi) 2827 psi underbalanced -1151psi) Target BHP at Window 12.1 3978 psi 3978 psi Choke Pressure Required to Maintain Target E' 453 psi 1151 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 3I-01 is a Kuparuk producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize laterals to target the Kuparuk sands to the west and north of the existing 3I-01 wellbore. The laterals will increase throughput and recovery from a potentially sheltered corner of a fault block. A recent rig workover installed tandem wedges to facilitate cutting a window with CTD. Prior to CTD operations E -line will set an inner wedge in the tandem wedge. CDR3-AC will mill a window in the tubing and casing using the tandem wedge like a whipstock. Page 4 of 7 June 27, 2018 PTD Application: 31-011-1, 31-011-1-01, 31-011-1-02, 31-01L1-03, 31-0l Ll Pre -CTD Work 1. RU Slickline: Pull SOV and set GLVs. 2. RU E -line: Set inner wedge. 3. Prep site for Nabors CDR3-AC. Ria Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 3I-0IL1 Lateral (A sand -West) a. Mill 2.80" window at 8728' MD. b. Drill 3" bi-center lateral to TD of 11,900' MD. c. Run 2%" slotted liner with an aluminum billet from TD up to 10,650' MD. 3. 3I-O1L1-01 Lateral (A sand- West) a. Kickoff of the aluminum billet at 10,650' MD. b. Drill 3" bi-center lateral to TD of 12,250' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 9200' MD. 4. 3I-OIL1-02 Lateral (A sand -West) a. Kick off of the aluminum billet at 9200' MD. b. Drill 3" bi-center lateral to TD of 11,925' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 9085' MD. 5. 3I-OIL1-03 Lateral (A sand -North) a. Kickoff of the aluminum billet at 9085' MD. b. Drill 3" bi-center lateral to TD of 12,000' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 10,100' MD. 6. 3I-OlLl-04 Lateral (A sand -North) a. Kickoff of the aluminum billet at 10,100' MD. b. Drill 3" bi-center lateral to TD of 12,000' MD. c. Run 2%" slotted liner with aluminum billet from TD up to 9300' MD. 7. 3I-0IL1-03 Lateral (A sand -West) a. Kickoff of the aluminum billet at 9300'M0. b. Drill 3" bi-center lateral to TD of 12,050' MD. c. Run 2%" slotted liner with deployment sleeve from TD up to 8725' MD. 8. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC. Post -Rig Work 1. Return to production. and 31-01 L1-05 Page 5 of 7 June 27, 2018 PTD Application: 31-01L1, 3I-011-1-01, 31-01L1-02, 3I-011-1-03, 31-01L1-04, and 31-0l L1-05 Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure, so installed in this well is a deployment valve. This valve, when closed using hydraulic control lines from surface, isolates the well pressure and allows long BHA's to be deployed/un-deployed without killing the well. If the deployment valve fails, operations will continue using the standard pressure deployment process. A system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. — Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slick -line. — When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. — The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running — The 31-01 well has a deployment valve installed. It will serve to deploy liners into the newly drilled laterals. If the valve fails, the laterals will be displaced to an overbalance completion fluid (as detailed in Section 8 "Drilling Fluids Program') prior to running liner. — While running 2%" slotted liner, a joint of 2%" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2%" rams will provide secondary well control while running 2%" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). Page 6 of 7 June 27, 2018 PTD Application: 31-01L1, 31-011-1-01, 31-011-1-02, 31-01L1-03, 31-011-1-04, and 31-01Ll-05 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - - MWD directional, resistivity, and gamma ray will be run over the entire open hole section Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance ft 31-01 L1 18,980 31-01 L1-01 18,740 31-01 L1-02 18,990 31-01 L1-03 20,930 31-01 L1-04 20,815 31-01 L1-05 20,845 - Distance to Nearest Well within Pool 16. Attachments Attachment 1: laterals. Lateral Name I Distance ft Well 31-01 L1 513 31-03 31-01 L1-01 718 31-03 31-01 L1-02 513 31-03 31-011-1-03 159 3M-04 31-011-1-04 159 3M-04 31-01Ll-05 159 3M-04 Directional Plansfor3l-01L1, 31-01L1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31-01L1-05 Attachment 2: Current Well Schematic for 31-01.. Attachment 3: Proposed Well Schematic for 31-01L1, 31-01L1-01, 31-01L1-02, 31-01L1-03, 31-01L1-04, and 31- 01 L 1-05 laterals. Page 7 of 7 June 27, 2018 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 31 Pad 31-01 31-01 L1-02 Plan: 31-01 L1-02_wp01 Standard Planning Report 19 July, 2018 BA UGHES aGEcompany ConocoPhillips Database: EDT Alaska Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupawk River Unit Site: Kupamk 31 Pad Well: 31-01 Wellbore: 31-OIL1-02 Design: 31-011-1-02_wp01 ConocoPhillips Planning Report Local Co�rdinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 31-01 Mean Sea Level 31-01 @ 71.00usft (31-01) True Minimum Curvature Project Kuparuk River Unit North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor BArR S a GEconi site Kupamk 31 Pad Site Position: Northing: 6,007,285.50 usft Latitude: 70' 25' 52059 N From: Map Easting: 508,056.44 usft Longitude: 149' 56' 3.597 W Position Uncertainty; 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.06 ° Well 31-01 Well Position -N/,S 0.00 usft Northing: 6,007,285.50 usft Latitude: 70" 25' 52.059 N +E/ -W 0.00 usft Easting: 508,056.44 usft Longitude: 149.56 9° 56' 3.597 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: — _ 0.00 usft Wellbore 31-0lLl-02 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1°l C) InT) BGGM2018 9/1/2018 16.95 80.93 57.444 J Design 31-011-1-02_wp01 Audit Notes: Version: Phase: PLAN Tie On Depth: 9,200.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 0.00 0.00 0.00 300.00 711912018 12:52:47PM Page 2 COMPASS 5000.14 Build 85 Plan Sections ConocoPhillips BAR ConocoPhillips Planning Report WHES a GEcompaW Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well 31-01 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk 31 Pad North Reference: True Well: 31-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-01 Lt -02 -El-W Rate Design: 31-01 L1-02_wp01 Rate TFO Plan Sections Measured TVD Below Dogleg Build Tum Depth Inclination Azimuth System -NI-S -El-W Rate Rate Rate TFO (usft) (°) (1 (usft) (usft) (usft) (-1100ft) (-1100ft) (°NOOft) (°) Target 9,200.00 90.13 304.61 6,281 .32 3,697.59 4,519.92 0.00 0.00 0.00 0.00 9,305.00 97.48 304.61 6,274.36 3,757.05 4,433.75 7.00 7.00 0.00 0.00 9,455.00 92.96 295.09 6,260.69 3,831.26 4,304.35 7.00 -3.01 -6.35 245.00 9,630.00 89.75 283.26 6,256.55 3,888.60 4,139.42 7.00 -1.83 -6.76 255.00 9,730.00 86.80 276.91 6,259.57 3,906.10 4,041.07 7.00 -2.95 -6.35 245.00 9,875.00 87.73 266.79 6,266.52 3,910.77 3,896.50 7.00 0.64 -6.98 275.00 10,100.00 89.44 251.13 6,272.12 3,867.83 3,676.43 7.00 0.76 -6.96 276.00 10,250.00 89.45 261.63 6,273.59 3,832.56 3,530.86 7.00 0.01 7.00 90.00 10,350.00 84.96 256.25 6,278.48 3,813.43 3,432.89 7.00 -4.49 -5.38 230.00 10,450.00 82.03 262.66 6,289.82 3,795.24 3,335.28 7.00 -2.92 6.40 115.00 10,550.00 88.11 266.15 6,298.41 3,785.54 3,236.18 7.00 6.07 3.50 30.00 10,725.00 90.26 254.09 6,300.91 3,755.58 3,064.13 7.00 1.23 -6.89 280.00 10,800.00 92.48 249.33 6,299.12 3,732.06 2,992.96 7.00 2.95 -6.35 295.00 10,925.00 93.96 257.97 6,292.09 3,696.95 2,873.32 7.00 1.19 6.91 80.00 11,125.00 101.86 269.65 6,264.50 3,675.44 2,676.91 7.00 3.95 5.84 55.00 11,300.00 94.69 279.69 6,239.27 3,689.65 2,504.66 7.00 -4.10 5.74 125.00 11,550.00 91.48 262.46 6,225.73 3,694.27 2,256.04 7.00 -1.28 -6.89 260.00 11,725.00 93.56 250.38 6,218.00 3,653.30 2,086.42 7.00 1.19 -6.91 280.00 11,925.00 89.87 263.89 6,211.98 3,608.92 1,892.01 7.00 -1.84 6.76 105.00 7/19/2018 12'52:47PM Page 3 COMPASS 5000.14 Build 85 ConocoPhillips BA�(ER ConocoPhillips Planning Report ryUGHES aGEcompany Database: EDT Alaska Sandbox Local Coordinate Reference: Well 3141 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 31-01 @ 71.00usft (31-01) Site: Kuparuk3l Pad North Reference: True Well: 31-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-O1Ll-02 Design: 31-01 Lt-02_Wp01 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N! -S +E/ -W Section Rate Azimuth Northing Easting (usft) (1) (') (usft) (usft) (usft) (usft) (°1100ft) V) (usft) (usft) 9,200.00 - 90.13 304.61 6,281.32 3,697.59 4,519.92 -2,065.57 0.00 0.00 6,010,987.60 512,571.91 TIP/KOP 9,300.00 97.13 304.61 6,275.00 3,754.24 4,437.83 -1,966.16 7.00 0.00 6,011,044.15 512,489.77 9,305.00 97.48 304.61 6,274.36 3,757.05 4,433.75 -1,961.21 7.00 0.00 6,011,046.96 512,485.69 Start 7 dig 9,400.00 94.63 298.56 6,264.34 3,806.50 4,353.31 -1,866.83 7.00 -115.00 6,011,096.31 512,405.21 9,455.00 92.96 295.09 6,260.69 3,831.26 4,304.35 -1,812.05 7.00 -115.64 6,011,121.02 512,356.22 3 9,500.00 92.14 292.04 6,258.69 3,849.23 4,263.15 -1,767.38 7.00 -105.00 6,011,138.94 512,315.00 9,600.00 90.30 285.29 6,256.56 3,881.21 4,168.49 -1,669.41 7.00 -105.14 6,011,170.82 512,220.32 9,630.00 89.75 283.26 6,256.55 3,888.60 4,139.42 -1,640.54 7.00 -105.28 6,011,178.18 512,191.24 4 9,700.00 87.68 278.82 6,258.12 3,902.00 4,070.75 -1,574.37 7.00 -115.00 6,011,191.51 512,122.57 9,730.00 86.80 276.91 6,259.57 3,906.10 4,041.07 -1,546.62 7.00 -114.90 6,011,195.57 512,092.89 6 9,800.00 87.23 272.02 6,263.22 3,911.55 3,971.40 -1,483.56 7.00 -85.00 6,011,200.94 512,023.22 9,875.00 87.73 266.79 6,266.52 3,910.77 3,896.50 -1,419.08 7.00 -84.75 6,011,200.09 511,948.33 6 9,900.00 87.91 265.05 6,267.47 3,909.00 3,871.58 -1,398.39 7.00 -84.00 6,011,198.28 511,923.41 10,000.00 88.66 258.09 6,270.46 3,894.35 3,772.77 -1,320.14 7.00 43.93 6,011,183.53 511,824.63 10,100.00 89.44 251.13 6,272.12 3,867.83 3,676.43 -1,249.97 7.00 -83.73 6,011,156.91 511,728.32 7 10,200.00 89.44 258.13 6,273.11 3,841.35 3,580.07 -1,179.76 7.00 90.00 6,011,130.32 511,632.00 10,250.00 89.45 261.63 6,273.59 3,832.56 3,530.86 -1,141.53 7.00 89.93 6,011,121.49 511,582.81 6 10,300.00 87.20 258.95 6,275.06 3,824.13 3,481.60 -1,103.09 7.00 -130.00 6,011 , 113.01 511,533.56 10,350.00 84.96 256.25 6,278.48 3,813.43 3,432.89 -1,066.26 7.00 -129.92 6,011,102.25 511,484.87 9 10,400.00 83.48 259.45 6,283.52 3,802.96 3,384.27 -1,029.38 7.00 115.00 6,011,091.73 511,436.26 10,450.00 82.03 262.66 6,289.82 3,795.24 3,335.28 -990.82 7.00 114.68 6,011,083.96 511,387.29 10 10,500.00 85.07 264.41 6,295.43 3,789.65 3,285.92 -950.87 7.00 30.00 6,011,078.31 511,337.94 10,550.00 88.11 266.15 6,298.41 3,785.54 3,236.18 -909.85 7.00 29.80 6,011,074.16 511,288.21 11 10,600.00 88.72 262.70 6,299.80 3,780.69 3,186.45 -869.20 7.00 -80.00 6,011,069.25 511,238.48 10,700.00 89.95 255.81 6,300.96 3,762.07 3,088.27 -793.48 7.00 -79.90 6,011,050.52 511,140.33 10,725.00 90.26 254.09 6,300.91 3,755.58 3,064.13 -775.82 7.00 -79.82 6,011,044.01 511,116.20 12 10,800.00 92.48 249.33 6,299.12 3,732.06 2,992.96 -725.95 7.00 -65.00 6,011,020.41 511,045.07 13 10,900.00 93.67 256.24 6,293.75 3,702.51 2,897.64 -658.17 7.00 80.00 6,010,990.77 510,949.79 10,925.00 93.96 257.97 6,292.09 3,696.95 2,873.32 -639.90 7.00 80.37 6,010,985.18 510,925.48 14 11,000.00 96.96 262.30 6,284.95 3,684.15 2,799.80 -582.62 7.00 55.00 6,010,972.30 510,851.98 11,100.00 100.89 268.16 6,269.43 3,675.91 2,701.42 -501.54 7.00 55.41 6,010,963.96 510,753.62 11,125.00 101.86 269.65 6,264.50 3,675.44 2,676.91 480.55 7.00 56.32 6,010,963.46 510,729.11 16 11,200.00 98.81 274.00 6,251.03 3,677.80 2,603.19 415.53 7.00 125.00 6,010,965.74 510,655.40 11,300.00 94.69 279.69 6,239.27 3,689.65 2,504.66 -324.27 7.00 125.78 6,010,977.49 510,556.87 16 11,400.00 93.44 272.79 6,232.18 3,700.48 2,405.57 -233.04 7.00 -100.00 6,010,988.21 510,457.77 71192018 12:52:47PM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips BA ER ConocoPhillip5 Planning Report I IGHES BAT GEcmn,, Database: EDT Alaska Sandbox Local Co-ordinate Reference: Well 31-01 Company: ConocoPhillips (Alaska) Inc. -Kup2 TVD Reference: Mean Sea Level Project: Kupawk River Unit MD Reference: 31-01 @ 71.00usft (31-01) Site: Kupawk 31 Pad North Reference: True Well: 31-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-011-1-02 Design: 31-011-1-02_Wp01 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/ -S +E/ -W Section Rate Azimuth Northing Easting (usft) (_) (o) (usft) (usft( (usft) (usft) (-1100ft) V) (usft) (usft) 11.550.00 9148 262.46 6,225.73 3,694.27 2,256.04 -106.66 7.00 -100.83 6010,981.83 510,308.27 17 11,600.00 92.09 259.01 6,224.17 3,686.22 2,206.73 -67.97 7.00 -80.00 6,010,973.73 510,258.97 11,700.00 93.27 252.10 6,219.49 3,661.33 2,110.05 3.30 7.00 -80.11 6,010,948.74 510,162.33 11,725.00 93.56 250.38 6,218.00 3,653.30 2,086+42 19.75 7.00 -80.43 6,010,940.69 510,138.71 18 11,800.00 92.19 255.45 6,214.24 3,631.30 2,014.85 70.74 7.00 105.00 6,010,918.61 510,067.17 11,900.00 90.34 262.20 6,212.03 3,611.94 1,916.83 145.95 7.00 105.25 6,010,899.15 509,969.18 11,925.00 • 89.87 263.89 6,211.98 - 3,608.92 1,892.01 165.92 7.00 105.40 6,010,896.10 509,944.37 Planned TD at 11925.00 7/19/2018 12:52:47PM Page 5 COMPASS 5000.14 Build 85 ConocoPhillips BA_ j(ER ConocoPhillips Planning Report HUGHES aGEcompany Database: EDT Alaska Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Site: Kuparuk 31 Pad Well: 31-01 Wellbore: 31-0111-02 Design: 31-0111-02_W p01 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 31-01 Mean Sea Level 31-01 @ 71.00usft (31-01) Time Minimum Curvature Targets Target Name -hit/miss target Dip Angle Dip Dir. TVD -N/-S +E/ -W Northing Easting -Shape (°) (°) (usft) (usft) (usft) (usft) (usft) Latitude Longitude 31 -01L1 -02T03 0.00 0.00 6,266.00 2,431.371,144,047.17 6,010,952.00 1,651,986.00 70'11'59.091N 140'41'1.927 W, - plan misses target center by 1139527.96usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) 6,010,868.00 - Point - plan misses target center by 1139522.27usft at 31-011-1_Fault4 0.00 0.00 6,306.00 2,170.491,142,991.78 6,010,690.00 1,650,931.00 70° 11'58,128 N 140'41'33.291 W - plan misses target center by 1138472.89usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) Point 6,248.00 0.00 0.00 6,011,187.00 - Polygon Point 6,306.00 0.00 0.00 6,010,690.00 1,650,931.00 Point 2 6,306.00 1.00 1.00 6,010,691.00 1,650,932.00 31-011-1_Fault2_M 0.00 0.00 0.00 2,347.391,144,024.08 6,010,868.00 1,651,963.00 70° 11'58.310 N 140'41'2.957 W - plan misses target center by 1139522.27usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Polygon - Rectangle (sides W1.00 1-17,000.00 D0.00) Point 6,248.00 0.00 0.00 6,011,187.00 1,652,464.00 Point 6,246.00 1.00 1.00 6,011,188.00 31-01 CTD Polygon Nortl 0.00 0.00 0.00 1,925.811,144,520.67 6,010,447.00 1,652,460.00 70' 11'53.479 N 140° 40'50.588 W - plan misses target center by 1140019.44usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) 0.00 -Polygon 281.16 6,010,405.01 1,652,842.00 Point Point 1 0.00 0.00 0.00 6,010,447.00 1,652,460.00 Point 0.00 934.28 -183.06 6,011,380.99 1,652,275.95 Point 0.00 1,493.14 8.54 6,011,940.00 1,652,466.93 Point 0.00 3,219.29 34.31 6,013,666.00 1,652,490.83 Point 0.00 3,030.77 517.17 6,013,478.02 1,652,973.85 Point 0.00 1,541.74 407.63 6,011,989.03 1,652,865.92 Point 0.00 759.88 195.80 6,011,207.02 1,652,654.96 Point 0.00 96.56 438.14 6,010,544.02 1,652,897.99 Point 0.00 -181.13 107.82 6,010,266.00 1,652,568.00 Point 10 0.00 0.00 0.00 6,010,447.00 1,652,460.00 31-01 CTD Polygon Nortl 0.00 0.00 0.00 1,758.681,144,621.50 6,010,280.00 1,652,561.00 70' 11'51.707 N 140° 40'48.435 W - plan misses target center by 1140120.54usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) -Polygon - Polygon Point 6,248.00 0.00 0.00 6,011,187.00 1,652,464.00 Point 6,246.00 1.00 1.00 6,011,188.00 Point 1 0.00 0.00 0.00 6,010,280.00 1,652,561.00 Point 0.00 124.72 281.16 6,010,405.01 1,652,842.00 Point 0.00 451.71 326.50 6,010,732.02 1,652,886.98 Point 0.00 799.27 -180.20 6,011,079.00 1,652,379.96 Point 0.00 595.76 -1,655.55 6,010,873.91 1,650,904.97 Point 0.00 1,672.96 -2,710.55 6,011,949.86 1,649,848.92 Point 0.00 1,106.98 -2,787.14 6,011,383.86 1,649,772.94 Point 0.00 224.03 -1,954.97 6,010,501.90 1,650,605.98 Point 0.00 417.38 -329.60 6,010,696.98 1,652,230.98 Point 10 0.00 295.07 -34.70 6,010,575.00 1,652,525.98 Point 11 0.00 0.00 0.00 6,010,280.00 1,652,561.00 31-01-1-03_Fault5 0.00 0.00 6,246.00 2,665.881,144,525.47 6,011,187.00 1,652,464.00 70' 12' 0.656 N 140' 40'47.202 W - plan misses target center by 1140006.02usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) -Polygon Point 6,248.00 0.00 0.00 6,011,187.00 1,652,464.00 Point 6,246.00 1.00 1.00 6,011,188.00 1,652,465.00 31-011-1-01 0.00 0.00 6,257.00 2,406.101,144,294.17 6,010,927.00 1,652,233.00 70' 11'58.478 N 140' 40'54.966 W - plan misses target center by 1139774.98usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point 31-0111-02T05 0.00 0.00 6,289.00 2,315.961,143,487.99 6,010,836.00 1,651,427.00 70' 11'58.802 N 140' 41' 18.445 W - plan misses target center by 1138968.91 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point 31-011-7-03_Fault5M 0.00 0.00 0.00 2,665.881,144,525.47 6,011,187.00 1,652,464.00 70' 12'0.656 N 140' 40'47.202 W - plan misses target center by 1140023.33usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Rectangle (sides W1.00 H1,000.00 D0.00) 7/192018 12:52:47PM Page 6 COMPASS 5000.14 Build 85 ConocoPhillips BATH ConocoPhillips Planning Report I jUGI ES aGEcompany Database: EDT Alaska Sandbox Local Co-ordinate Reference: Company: ConocoPhilllps(Alaska) Inc.-Kup2 TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kuparuk 31 Pad North Reference: Well: 31-01 Survey Calculation Method: Wellbore: 31-OILl-02 N, 4519.92 E) Design: 31-01 1-1-02_wp01 - Point -plan misses target center by 1139083.92usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point 31-01 L1_Fault3_M 0.00 0.00 0.00 2,283.991,143,457.95 6,010,804.00 - plan misses target center by 1138956.23usft at 9200.00usft MD (6281.32 TVD, 3697.59 N. 4519.92 E) - Rectangle (sides W1.00 1-11,000.00 D0.00) Point 6,299.00 1.00 1.00 6,010,805.00 1,651,398.00 31-01 1 1-02_T01 0.00 0.00 6,265.00 2,322.871,144,505.10 6,010,844.00 31-01 CTD Polygon Wes 0.00 0.00 0.00 1,758.681,144,621.50 6,010,280.00 - plan misses target center by 1140120.54usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Polygon - Point Point 1 0.00 0.00 0.00 6,010,280.00 Point 0.00 124.72 281.16 6,010,405.01 Point 3 0.00 451.71 326.50 6,010,732.02 Point 0.00 799.27 -180.20 6,011,079.00 Points 0.00 523.82 -2,687.73 6,010,800.87 Point 0.00 138.79 -2,702.13 6,010,415.86 Point 0.00 417.37 -319.60 6,010,696.98 Pointe 0.00 299.07 -34.70 6,010,579.00 Point 0.00 0.00 0.00 6,010,280.00 Well 31-01 Mean Sea Level 31-01 @ 71.00usft (31-01) True Minimum Curvature 1,651,397.00 1,652,561.00 1,652,561.00 1,652,842.00 1,652,886.98 1,652,379.96 1,649,872.97 1,649,858.99 1,652,240.98 1,652,525.98 1,652,561.00 70° 11'58.537 N 140'41'19.445 W 70° 11'51.707 N 140° 40'48.435 W 31-01L1_Fault3 0.00 0.00 6,299.00 2,283.991,143,457.95 6,010,804.00 1,651,397.00 70° 11'58.537 N 140° 41' 19.445 - plan misses target center by 1138938.91 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Polygon Point 6,299.00 0.00 0.00 6,010,804.00 1,651,397.00 Point 6,299.00 1.00 1.00 6,010,805.00 1,651,398.00 31-01 1 1-02_T01 0.00 0.00 6,265.00 2,322.871,144,505.10 6,010,844.00 1,652,444.00 70° 11' 57.357 N 140° 40'49.291 - plan misses target center by 1139986.01 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) 1,651,963.00 - Paint 1,651,964.00 31-0l Ll -02 TOS 0.00 0.00 6,264.00 2,195.671,142,818.79 6,010,715.00 1,650,758.00 70° 11' 58.629 N 140° 41'38.134 W - plan misses target center by 1138299.87usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point 31-01 L1_Fault2 0.00 0.00 6,288.00 2,347.391,144,024.08 6,010,868.00 1,651,963.00 70°11'58.310N 140"41'2.957W - plan misses target center by 1139504.96usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Polygon Point 6,288.00 0.00 0.00 6,010,868.00 1,651,963.00 Point 6,288.00 1.00 1.00 6,010,869.00 1,651,964.00 31-01 1-1-02T09 0.00 0.00 6,212.00 2,129.511,142,036.64 6,010,648.00 1,649,976.00 70°11'59.149N 140°42'0.820W - plan misses target center by 1137517.81 usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point 31-011-1-02 T06 0.00 0.00 6,301.00 2,278.251,143,219.92 6,010,798.00 1,651,159.00 70° 11'58.835 N 140' 41'26.286 W - plan misses target center by 1138700.89usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point 31-OtLt_Fauft4_M 0.00 0.00 0.00 2,170.491,142,991.78 6,010,690.00 1,650,931.00 70'11'58.128N 140°41'33.291W - plan misses target center by 1138490.22usft at 9200.00usft MD (6281.32 TVD, 3697.59 N. 4519.92 E) - Rectangle (sides W1.00 1-11,000.00 DO.00) 31-0lLl-02_T07 0.00 0.00 6,292.00 2,217.461,143,018.84 6,010,737.00 1,650,958.00 70° 11'58.544 N 140° 41'32.310 W - plan misses target center by 1138499.88usft at 9200.00usft MD (6281.32 TVD, 3697.59 N, 4519.92 E) - Point Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,925.00 6,211.98 23/8" 2375 3.000 711912018 12: 52: 47PM Page 7 COMPASS 5000.14 Build 85 ConocoPhillips BATER ConocoPhillips Planning Report HUGHES aGEcompany Database: EDT Alaska Sandbox Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Site: Kupamk 31 Pad Well: 31-01 Wellbore: 31-01 Lt -02 Design: 31-01 L1-02_wp01 Plan Annotations Measured Vertical Depth Depth (usft) (usft) 9,200.00 6,281.32 9,305.00 6,274.36 9,455.00 6,260.69 9,630.00 6,256.55 9,730.00 6,259.57 9,875.00 6,266.52 10,100.00 6,272.12 10,250.00 6,273.59 10,350.00 6,278.48 10,450.00 6,289.82 10,550.00 6,298.41 10,725.00 6,300.91 10,800.00 6,299.12 10,925.00 6,292.09 11,125.00 6,264.50 11,300.00 6,239.27 11,550.00 6,225.73 11,725.00 6,218.00 11,925.00 6,211.98 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Local Coordinates +NIS +E/ -W (usft) (usft) 3,697.59 4,519.92 3,757.05 4,433.75 3,831.26 4,304.35 3,888.60 4,139.42 3,906.10 4,041.07 3,910.77 3,896.50 3,867.83 3,676.43 3,832.56 3,530.86 3,813.43 3,432.89 3,795.24 3,335.28 3,785.54 3,236.18 3,755.58 3,064.13 3,732.06 2,992.96 3,696.95 2,873.32 3,675.44 2,676.91 3,689.65 2,504.66 3,694.27 2,256.04 3,653.30 2,086.42 3,608.92 1,892.01 Comment TIP/KOP Stan 7 cls 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Planned TD at 11925.00 Well 31-01 Mean Sea Level 31-01 Q 71.00usft (31-01) True Minimum Curvature 711912018 12 52 47PM Page 8 COMPASS 5000 14 Build 85 Baker HugheslNTEQ ConocoPhillips Travelling Cylinder ReportI BIKER a GErompeRy Company: ConocoPhillips(Alaska) Inc.-Kup2 Project: Kuparuk River Unit Reference Site: Kupawk 31 Pad Site Error: 0.00 usft Reference Well: 31-01 Well Error: 0.00 usft Reference Wellbore 31-01 L1-02 Reference Design: 31-0111-02_wp01 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 31-01 31-01 Q 71.00usft (31-01) 31-01 @ 71.00usft (31-01) True Minimum Curvature 1.00 sigma OAKEDMP2 Offset Datum ieference 31-01Ll-02_wp01 Depth altar type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference To interpolation Method: MD Interval 25.00usft Error Model: ISCWSA 3epth Range: 9,200.00 to 11,925.00usft Scan Method: Tray. Cylinder North iesults Limited by: Maximum center -center distance of 1,385.40 usft Error Surface: Pedal Curve Survey Tool Program Date 7/18/2018 Depth Depth From To 11,925.00 6,282.98 23/8" (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 8,700.0031-01(31-01) GCT -MS Schlumberger GCT multishot 8,700.00 9,200.00 31-01 L7_wp02(31-01 Li) MWD MWD -Standard 9,200.00 11,925.00 31-011-1-02_wp01 (31-011-1-02) MWD MWD - Standard Casing Points Measured Vertical Depth Depth (usft) (usft) 11,925.00 6,282.98 23/8" Name Casing Hole Diameter Diameter 2-3/S 3 Summary Kupamk 31 Pad -31-01-31-01-31-01 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) Measured (usft) Reference Kuparuk 31 Pad T..Koae enter Wellbore Centre Casing- Centre to No Go 31-01 - 31-01 - 31-01 9,212.66 8,475.00 449.56 11.47 443.71 Pass - Major Risk 31-01-31-011-1-31-01 Ll_wp02 10,459.68 10,425.00 29.26 1.33 29.03 Pass - Minor 1/10 31-01-31-01 L1-01-31-011-1-01_wp02 10,934.02 10,900.00 16.77 1.37 15.50 Pass - Minor 1/10 31-01-31-01 L1-03-31-01 L1-03_wp02 9,399.52 9,450.00 150.13 1.36 149.22 Pass - Minor 1110 31-01-31-011-1-04-31-01 Li-04_wp01 9,399.52 9,450.00 150.13 1.36 149.22 Pass - Minor 1/10 31-01-31-011-1-05-31-01 L1-05_wp01 9,400.77 9,450.00 149.40 1.31 148.53 Pass - Minor 1/10 31-02 - 31-02 - 31-02 6.115.74 0.44 0.00 -115.11 3,376.69 Out of range 31-04 - 31-04 - 31-04 468.34 11.53 462.29 Pail -Major Risk 9.249.15 6.350.74 Out of range 31-08 - 31-08 - 31-08 0.45 0.00 -113.95 3.374.31 4255.37 Out of range Offset Design Kupamk 31 Pad -31-01-31-01-31-01 olsat site Error. 000 use survey Program: t0SrGCT-MS Rule AssMmd: Major Risk Wine Well Error. 0.00 usft Referenoe clear Semi Major Axis Measured vertical Measured Vertical Reference meet T..Koae enter Wellbore Centre Casing- Centre to No Go Allowable Warning Milk capN Meet nepth Avmuth +Nk e�-W Hob Size Cars. eietanu Devlauon (..it) (usn) (usm Weak) tush (usft) (°I tum) tualt 1"1 (usnl Iuste luau 9.21266 6.352.20 8,475.00 6.134.42 0,43 0.00 -116.41 3.378.91 4,289.30 3 449.56 11.47 443,71 Pa.- Major Risk. CO, ES. SF 9,230.40 6.351.69 8,450.00 6.115.74 0.44 0.00 -115.11 3,376.69 4,272.04 3 468.34 11.53 462.29 Pail -Major Risk 9.249.15 6.350.74 8.425.00 8.097.08 0.45 0.00 -113.95 3.374.31 4255.37 3 137.29 11.59 481.03 Pass - Major Risk 9.288.90 6,349.26 8,400.00 6.078.43 GAS 0.00 -112.92 3.371.78 4,239.91 3 508.35 11.65 499.87 Pass - Major Risk 9.289.93 8,367.19 8,375.00 6,059.60 0.47 0.00 -112.00 3,369.05 4,223.47 3 525.51 11.71 510.79 Pass - Major Risk 9,311.70 8.344.50 4350.00 8,04118 0.49 0.00 -111.67 3.366.12 6,207.07 3 544]2 11.62 537.76 Pass - Major Risk 9.333.12 6.341.91 8.325.00 6.022.53 0.51 0.00 -112.43 3,362.97 4.190.70 3 sees 12.02 555.7a Pass - Major Risk 9.35,1.56 6,339.51 6.300.00 6.003.90 0.52 0.00 -113.20 3,359.61 4,174.38 3 593.30 12.22 575.85 Pass - Major RU 9,376.07 6.337.42 8.275.00 5.985.31 0.54 0.00 -113.99 3.356.00 4,158.05 3 602.68 12.42 591 Pass - Major Risk 9,397.61 8.335.53 8.250.40 5,988.83 0.58 0,00 -114.80 3.352.09 1,141.88 3 622.15 12.66 61423 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 71182018 3:12:29PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Profact Kupamk Rlver Unit Site: Kupamk 31 Pad alm�al.mn,�. xonn wrmnc Nonn less• ue9muc nele WELLBORE DETAILS' 31-OILl-02 REFERENCE INFORIATION Parent Wellbore. 31A1L1 �ORQInaa(M) Relamme. Wd3bI.T.NOM Wall: 31.01 sn.,am. nwaaN Tie On MD: 9200.00 Ve lIND)Rae. wen see L" Wellbore: 11-011.1-02 aG!ik'. 8191' 14 Easting Reknnm: Man: 31-011.1-02 wpOt (31-01/31.01L1A2) ume Wooman 0.00 0.00 314,@.Wµ p wuurol Oepn Releienm: 31L1Ritaoum pial) aw b 6007285.50 508056.44 70" 25'52.059 N 149° cewbxm eeaoa: woman ax.va Mean' 690C 660C 630C 6000 570[ C a s4o[ o5 OC 0 -4 OC =45a 0 42a O390f 360[ 330f 30 0( 270( IBAn ER LMES 1 aGE� WELL DETAILS: 31-01 +N/ -S +E/ -W Northing Easting Latitude Longitude 0.00 0.00 1■■■■■�► 6007285.50 508056.44 70" 25'52.059 N 149° 56'3.597 W Sec MD Inc Azi TVDSS +N/ -S +E/ -W Dleg TFace VSect ■■■■■■■■■■�11 Annotation 1 9200.00 90.13 304.61 6281.32 3697.59 4519.92 0.00 0.00 -2065.57 TIPIKOP 2 9305.00 97.48 304.61 6274.36 3757.05 4433.75 7.00 0.00 -1961.21 Start 7 dis 3 9455.00 92.96 295.09 6260.69 3831.26 4304.35 7.00 245.00 -1812.05 3 4 9630.00 89.75 283.26 6256.55 3888.60 4139.42 7.00 255.00 -1640.54 4 5 9730.00 86.80 276.91 6259.57 3906.10 4041.07 7.00 245.00 -1546.62 5 6 9875.00 87.73 266.79 6266.52 3910.77 3896.50 7.00 275.00 -1419.08 ENSHRINES- 6 710100.00 89.44 251.13 6272.12 3867.83 3676.43 7.00 276.00 -1249.97 7 810250.00 1■■..I..■I.■■�■■■�.®■�11, 89.45 261.63 6273.59 3632.56 3530.86 7.00 90.00 A141.53 _0�rt►'LEON 8 910350.00 84.96 256.25 6278.48 3813.43 3432.89 7.00 230.00 A066.26 9 1010450.00 82.03 262.66 6289.82 3795.24 3335.28 7.00 115.00 -990.82 10 11 10550.00 88.11 266.15 6298.41 3785.54 3236.18 7.00 30.00 -909.85 11 1210725.00 90.26 254.09 6300.91 3755.58 3064.13 7.00 280A0 -775.82 12 1310800.00 92.48 249.33 6299.12 3732.06 2992.96 7.00 295.00 -725.95 13 1410925.00 93.96 257.97 6292.09 3696.95 2873.32 7.00 80.00 -639.90 14 15 11125.00 101.86 269.65 6264.50 3675.44 2676.91 7.00 55.00 480.55 15 1611300.00 94.69 279.69 6239.27 3689.65 2504.66 7.00 125.00 -324.27 16 1711550.00 91.48 262.46 6225.73 3694.27 2256.04 7.00 260.00 -106.66 17 18 11725.00 93.56 250.38 6218.00 3653.30 2086.42 7.00 280.00 19.75 18 19 11925.00 89.87 263.89 6211.98 3608.92 1892.01 7.00 105.00 165.92 Planned TD at 11925.00 Mean' 690C 660C 630C 6000 570[ C a s4o[ o5 OC 0 -4 OC =45a 0 42a O390f 360[ 330f 30 0( 270( IBAn ER LMES 1 aGE� West( -)/East(+) (300 usft/in) iii 1■■■■■�► ■I■■■ ■■■�1�■■.11.A■■.■■■.■■..■■■ ■ ■■■■■■■■■■�11 M 14 �■■.■ 'i■■■■■■■■■■■■ill'i ...■ ■.■.■� NONE a ����®,1'll'I..■.■ F11i..■■ ■I - ■■■■��■■■�1■ NINON _ ■■�■■■■■.■■■■ ■ ■■■■mono■m ■■■nl■■■■■■ ■■■■1■■. i■■ ...■�.�.1.�.•............ .■■■. ENSHRINES- ■■llgiVA■■■■■ 1■■..I..■I.■■�■■■�.®■�11, MEMO Ili.. a■■�__ ��■��® _0�rt►'LEON ■ I �dl�.■��J�iME■■ ,�■■■■..■■�■■■ IN West( -)/East(+) (300 usft/in) Vertical Section at 300.00° (85 usft/in) iii 1■■■■■�► ■I■■■ ■■■�1�■■.11.A■■.■■■.■■..■■■ NONE ■I - ■■■■��■■■�1■ NINON _ ■■�■■■■■.■■■■ mom ...■�.�.1.�.•............ 1■■..I..■I.■■�■■■�.®■�11, ■ ,�■■■■..■■�■■■ IN r� ��aa�Naaaaae�al�aaaaaaalaaaa� 1 1 -1�®_/���_�_®-® 1■��i���l��.■..��11��ii®■(i1.®■Ii.■■■■■.■■ 1s ■lii�■■I■■■■■..■1�■f11i11■■■■■■■■■■.■■■.■■� Vertical Section at 300.00° (85 usft/in) 31-01 RWO Final Schematic 16" 62# H-40 shoe @ 104' MD 9-5/8" 36# J-55 shoe @ 4346' MD A2 -sand perfs 18734'- 8760' MD 1 -sand perfs F8;70'- 8798' MD 7" 26# J-55 shoe @ 9010' MD Updated: 19 -Jul -2018 RLP 3-1/2" Camco MMG gas lift mandrels @ 3130' RKB Baker Orbit Valve @ 3597' RKB 3-1/2" 9.3# L-80 ELIE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels @ 4930, 6251', 7272', 8003' & 8465' RKB Baker Locator @ 8518' RKB Baker PBR 80-40 @ 8522' RKB (2.99" ID) Baker FHL Packer @ 8535' RKB (2.91" ID) 3-Y2" X landing nipple at 8588' RKB (2.813" min ID) Northern Solutions WEDGE (see details) Top of Wedge Assembly @ 8698' RKB 3-%" X landing nipple at 8712' RKB (2.813" min ID) Top of Wedge Assembly @ 8728' RKB 3-'/" X landing nipple at 8742' RKB (2.813" min ID) Baker WLEG @ 8747' RKB Northern Solutions Wedge * 3-1/2" 9.3# L-80 Base Pipe * 550' Tp at l Length long) * 0.625" Bore thru tipper Tray * 1.126" Bore thru Lower Ssotion * HES 2.81" X Nippla below 31-01 Proposed CTD Schematic @104'MD 9-518" 36# J-55 shoe @ 4346' MD 8LI KOP @ 8698' MD 113roposed KOP @ 8728' MD I 2 sand parts 8734'-8760' MD KI and pelts 8770' - 8798' MD 7" 26# J-55 shoe a 901V MD 3-1/2" Camco MMG gas lift mandrels @ 3129' RKB Baker Orbit Valve @ 3596' MD 3-1/2" 9.3# L-80 ELE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels @ 4929', 6250', 7271',8002'. 8 8464' Baker Locator @ 8517' RKB Baker PBR 8040 @ 8522' MD (3" ID) Baker FHL Packer @ 8535' MD (4" ID) VW' X landing nipple at 8588' MD (2.813" min ID) Northern Solutions WEDGE (see details) Top of Wedge Assembly @ 8698' IRKS 3-K" X landing nipple at 8712' MD (2.813" min ID) Top of Wedge Assembly @ 8728' RKB 3-'h" X landing nipple at 8741' MD (2.813" min ID) Baker WLEG @ 8747' MD Northern Solutions Wedge 5.905" OD (12.9- longe)Pipe -'40' Total Len 91h 0.625' Bore tlsu Lipper Tray. • 1.125" Bore tteu Lower Section ` HES 2.81" X t4ple below Updated: 18Jul-2018 WRL IIWILI-05 wool To @ 12,050' Mo Top of 12ner @ 8,M' MO TO @ 12,000' MD M M@9.300'MO 31-011.1-03 wp02 TD @ 12,000' MD Beet @ 10,100' MD I 31-01L1A2 wpol TO @ 11,925' MD 9""@ 9,085' MD 31411L1-0Iw0o2 TO @ ]@ 9,20 Billet @ 9,200'0' M MD 3f 111.w,,01 TO @ 11,900' MD Billet @ 10,650' MO TRANSMITTAL LETTER CHECKLIST WELL NAME: /eA& 3.1-- C� Z /_ I — n Z PTD: ✓ Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: L 6, V 14 Z,-' L°c Y POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment existing ell Permit LATERAL �of No. [ �� 1� API No. 50-"2- S/ 6�'- 64:D (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- _) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Com any Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testiLig program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERU PTD#:2180890 1 1 2 10 Appr Date 11 SFD 7/24/2018 12 13 14 15 16 Engineering Appr Date VTL 8/28/2018 18 19 00 Well Name: KUPARUK RIV UNIT 31-01L1-0 Program DEV Well bore seg 0 Initial Class/Type DEV / PEND GeoArea 690 Unit 11160 On/Off Shore O A -- rvonconven, gas conforms to AS31,05,030Q.1.A),(j,2.A-D) _ _ _ .. _ _ _ NA n nnular Disp Permittee attached... NA Lease number appropriate_ _ Yes _ _ Entire well within ADL0025521 Unique well name and number _ _ _ _ _ _ _ _ Yes 37 Well located in defined pool _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ KUPARUK RIVER,. KUPARUK RIV OIL -490100 Well located proper distance from drilling unit boundary .. _ _ Yes Kuparuk River Oil Pool, governed by Conservation Order No. 432D Well located proper distance from other wells.. _ _ _ _ ... _ _ Sufficient acreage available in drilling unit. Yes _ Conservation Order No. 432D has no interwell. spacing restrictions. Wellbore will be more than 500' _ _ _ _ _ _ If deviated, is wellbore plat. included Yes from an external property line Where_ ownership or landownership changes. As proposed, well will _ _ _ .. _ _ Yes ... _ conform to spacing. requirements. Operator only affected party _ _ _ _ _ .... Yes Operator has. appropriate bond in force _ _ _ _ _ . _ Yes Engineering Public Date: Commissioner: Date Commissioner Permit can be issued without conservation order .. _ Yes _ Permit can be issued without administrative approval _ _ _ _ _ _ Yes Can permit be approved before 15 -day waif _ _ _ _ _ _ Yes Well located within area and strata authorized by Injection Order# (put. 10# in. comments) (For; NA .... _ All Wells within 1/4 mile areaof review identified (For service well only) _ _ _ . _ _ NA Pre -produced injector: duration of pre production less than 3 months (For service well. only) _ _ .NA ... _ Conductor string. provided _ _ _ _ _ _ _ . _ _ _ _ NA Conductor set in KRU 31-01 Surface casing protects all known U$DWs _ NA _ Surface casing set in KRU 31701 CMT vol adequate to circulate. on conductor & surf csg _ NA Surface casing set and fully cemented CMT vol adequate to tie-in long string to. surf osg.. _ _ NA CMT will cover all known_ productive horizons _ No Productive. interval will be completed with uncemented slotted liner Casing designs adequate for C, T, B &_ permafrost. Yes Adequate tankage or reserve pit _ Yes Rig has steel tanks; all wastet0 approved disposal wells If.are-drill, has . a 10403 for abandonment been approved _ NA Adequate wellbore separation proposed_ Yes Anti_ -collision analysis complete; no major risk failures If diverter required, does it meet regulations _ _ _ NA _ Drilling fluid program schematic & equip list adequate _ _ _ _ _ _ _ BOPEs,.do they meet regulation Yes Max formation pressure is 5456 psig(1(i.7 ppg. EMW); will drill w/ 8,6. ppg EMW and maintain ove_rb_al w/ MPD _ _ _ _ _ _ _ _ _ Yes. BOPE.press rating appropriate: test to (put psig in comments)... _ _ Yes MPSP is 4829 psig; will test BOPs to 4900 psig Choke. manifold complies w/API. RP -53 (May 84) _ _ _ Yes _ Work will occur without operation shutdown_ _ _ _ _ _ Yes Is presence. of H2S gas probable _ _ _ _ _ Yes H2S measures required Mechanical.opni ition of wells within AOR verified (For service well only) _ . _ _ NA _ Geology 3o Permit can be issued w/o hydrogen sulfide measures No 31 -Pad wells are H2S-bearing. H2S measures are. required. 36 Data. presented on potential overpressure zones _ _ _ _ _ Yes Expected reservoir pressure is -12.1 ppg EMW, with a maximum up to 716.7 ppg_EMW. Appr Date 37 Seismic analysis of shallow gas zones_ _ _ NA Well will be drilled using 8,6 ppg mud,. a coiled -tubing rig, and managed_ pressure drilling. SFD 7/24/2018 38 Seabed condition survey (if off -shore) _ .NA _ _ _ _ technique to. control formation pressures and stabilize shale sections. NOTE: Chance 39 Contact name/phone for weekly progress reports [exploratory only] _ _ _ NA _ .. _ of encountering gas while drilling this wellbore due.to gas injection performed in this area. Geologic Commissioner: Engineering Public Date: Commissioner: Date Commissioner Date Pr /3o la 4-1�4, �h