Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-119DATA SUBMITTAL COMPLIANCE REPORT 3/18/2019 Permit to Drill 2181190 Well Name/No. KUPARUK RIV UNIT 2T-371-1 Operator CONOCOPHILLIPS ALASKA, INC. MD 13601 TVD 5907 Completion Date 12/13/2018 Completion Status 1 -OIL REQUIRED INFORMATION / Mud Log No I/ Samples No DATA INFORMATION List of Logs Obtained: GR/Res Well Log Information: Log/ Electr D t t Interval Current Status 1 -OIL API No. 50-103-20227-60-00 UIC No Directional Survey Yes V (from Master Well Data/Logs) Data Digital a ase Log Log Run OH/ 37L1 _25_tapescan_B H I_CTK.txt ED Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 21VID Final Log.cgm 30186 Digital Data ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 51VID Final Log.cgm 1/4/2019 ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 5TVDSS Final Log.cgm Electronic File: 2T-371-1 51VID Final Log.tif ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 2MD Final.pdf Log ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 5MD Final.pdf ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 5TVDSS Final.pdf T ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 EOW - NAD27.pdf {� ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 EOW - NAD27.txt ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 Final Surveys 13601'.csv ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 Final Surveys ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371.1 Survey Listing.txt ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 Surveys.txt ED C 30186 Digital Data 1/4/2019 Electronic File: 2T - 37L1 _25_tapescan_B H I_CTK.txt ED C 30186 Digital Data 1/4/2019 Electronic File: 2T- 37L1_5_tapescan_BH I_CTK.txt ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-37L1_output.tap ED C 30186 Digital Data 1/4/2019 Electronic File: 2T -37L1 21VID Final Log.tif ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 51VID Final Log.tif ED C 30186 Digital Data 1/4/2019 Electronic File: 2T-371-1 5TVDSS Final Log.tif Log C 30186 Log Header Scans 0 0 2181190 KUPARUK RIV UNIT 2T-371-1 LOG HEADERS AOGCC Page 1 oft Monday, March 18, 2019 DATA SUBMITTAL COMPLIANCE REPORT 3/18/2019 Permit to Drill 2181190 Well Name/No. KUPARUK RIV UNIT 2T -37L1 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20227-60-00 MD 13601 TVD 5907 Completion Date 12/13/2018 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 30197 Digital Data 1/4/2019 Electronic File: 2T -37L1 EOW - NAD27.pdf ED C 30197 Digital Data 1/4/2019 Electronic File: 2T -37L1 EOW - NAD27.bd ED C 30197 Digital Data 1/4/2019 Electronic File: 2T -37L1 EOW - NAD83.pdf ED C 30197 Digital Data 1/4/2019 Electronic File: 2T -37L1 EOW - NAD83.bd Log C 30197 Log Header Scans 0 0 2181190 KUPARUK RIV UNIT 2T -37L1 LOG Description HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report YO Directional / Inclination Data Mud Logs, Image Files, Digital Data Y / 1� Core Chips Y / V Production Test Informatior YY NA Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files YO Core Photographs Y N� Geologic Markers/Tops O Daily Operations Summary Cuttings Samples Y /® Laboratory Analyses Y COMPLIANCE HISTORY Completion Date: 12/13/2018 Release Date: 10/12/2018 Description Date Comments Comments: Compliance Reviewed By: Date: A06( ( Page 2 of 2 Monday, March 18, 2019 STATE OF ALASKA I ALASKA OIL AND GAS CONSERVATION COMMISSION WED WELL COMPLETION OR RECOMPLETION REPORT AND, I QG 1a.Well Status: Oi10 Gas❑ SPLUG❑ Other ❑ Abandoned ❑ Suspended E 1b. Well Class: °- 20AAC 25.105 20AAC 25.110 Development E] Exploratory ❑ GINJ❑ WINJ❑ WAG[] WDSPL❑ No. of Completions: Service E] Stratigraphic Test El 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: ConocoPhillips Alaska, Inc. Abend.: 12/13/2018 218-119 3. Address: 7. Date Spudded: 15. API Number: , P.O. Box 100360 Anchorage, AK 99510-0360 11/23/2018 50-103.20227-60-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 98' FNL, 556' FWL, Sec 12, T11N, RBE, UM 11/25/2019 KRU 2T -37L7 Top of Productive Interval: 9. Ref Elevations: KBA22 17. Field -1 Pool($): , 3735' FNL, 1564' FEL, Sec 10, T11N, RBE, UM GL: 80.5 BF: Kuparuk River Field/Kuparuk River Oil Pool Total Depth: 10. Plug Back Depth MD/TVD: 18, Property Designation: , 1210' FNL, 1548' FEL, Sec 15, T11N, RBE, UM 1301215894 ADL 25571, ADL 25568, ADL 25569 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD[TVD: 19. DNR Approval Number: Surface: x- 498945 y- 5969882 Zone- 4 13601/5907 LONS 84-133 TPI: x- 491547 y- 5966251 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD1rVD: Total Depth: x- 491565 y- 5963495 Zone- 4 NONE 1569/1515 5. Directional or Inclination Survey: Yes ❑� (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MDfrVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) 10710/5833 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER CASING FT GRADE SETTING DEPTH MD SETTING DEPTH TVD TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 16 62.5 H-40 41 121 41 121 36 103 SX AS 1 9.625 40 L-80 41 4145 41 4145 12.25 860 sx AS III Lead, 400 sx of Class G, 240 sx AS I Tail 7 26 L-80 39 11074 39 11074 8.5 240 sx Class G 2.375 4.6 L-80 10705 13012 5830 5694 3 Slotted Liner 24. Open to production or injection? Yes ❑� No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET (MD) PACKER SET (MD/TVD) Size and Number; Date Perfd): `0 SLOTTED LINER@ 11�la COMPLETION 3 112 10626 10597/5763 10710 -13012 MD and 6833-5894 TVD D r?V IL�116 ---- - 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑� VERIFIED MV --- Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) JAMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): 1212812018 GAS LIFT Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 1/6/2019 18hrs Test Period 146.25 306.75 2217 124 beans 2098 Flow Tubing jCasinq Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity- API (corr): Press. 237psi 1 1037 24 -Hour Rate 195 409 2956 Form 10-407 Revised 512017 J/`j'L 21511 cl / CONTINUED ON PAGE 2 R%DMSM/ lT X � ,� �y 1 6 20119 Submit ORIGINIAL onl (% 28. CORE DATA Conventional Core(s): Yes ❑ No 21 Sidewall Cores: Yes ❑ No R] If Yes, list formations and intervals cored (MDRVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD ND Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1569 1515 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 10710 _ 5833 information, including reports, per 20 AAC 25.071. Formation @ TPI-Kupamk A4 TD 13601 5907 Formation at total depth: Ku aruk A3 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontolonical report production or well test results, per 20 AAC 25.070, 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: Ryan McLaua Klin Authorized Title: tall CTD Engineer Contact Email: R an.McLau hlin co .com Authorized Contact Phone: 265-6218 Signature: Date: 11141�i INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 41b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and ND for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only KUP PROD WELLNAME 2T-37 WELLBORE 2T-37 Well Attribu¢ Ma l TD ConocoPhill)ps Firm Name weRwreAl"Ne weoporesbru. 134 MGIn 11080IXXBI Alaska, Ir>v KUPARUK RIVER UNIT 101032.221 00 PROD )34 3400.Uu 110800 zrs. vl4rzma243'.2e PM Last Tag VerM1aY tlaxY(acOd) Annotation 01111 EM 11 1111, Last MOCay Last Tag: RKB (Est 15of Fill, Leaving 5 of Open Pers) "62018 1 21-37 zembaej Howl. ffia Lest Rev Reason Anoalalbn arm 0- demo a WtMoi By Rev Reason: Installed OLD. Added Liner Top Depot 122./2018 21`-3] fe'l Casing Strings Casing Deanipxon Gofm) ID (an) mp(KKa) setDep (MR) s DepM(WO)... waren (I Grave Top Thermal CONDUCTOR 16 1506 410 121.0 121.0 62.58 H40 WELDED CONDUCTOR', 4161210 Cuing Damotlptlon DD(In) ID (in) Top (XKB) WBepN 01KB) vet Gepm Rod)... you" (1, 1L.. Grade TOpThred SURFACE 95/8 8.83 41.4 4,145.3 2,88" 4000 LA0 BTG NIPFIE:3M.0 casino wxrlpMon Go (In) to (m) Top (xKeI aN BepIF IXKB) selvplL wlM1m p...3ra0e roprn,eM PRODUCTION 7 6.28 38.7 11,0)3.6 6,Ofi5.9 26.00 LEO BTC -MOD Casing Deaviption It linl IDlin) Top IXNa) yet 0epm laNB) ael 0apm UVV;-. vN-milo.Gra]e Top TxreaG LI LATERAL 2Cal 1.99 10,704.8 10768.0 5,870.0 4.60 L-80 STL GSS LIFT; 3.Iai9 Tubing Strings Tom, g Description Slring Ma_. ID (in) Top (XNB) am wpm (M1. aN Beplx(rvB)L.. wI XN'X) Grave iop Connmlbn TUBING 3112 299 36fi 10.6256 5.780.3 9.30 L40 PBM-EUE Completion Details Top(rvBl 1, l-1 Nominal GIRFACE: 41 H.tW0 Top 1XNe) 'Arge P) Xem Gea Com to (in, AeM.,rob-.ma p.;qG 36.6 35.6 000 HANGER FMC GEN M TUBING HANGER 3.500 a.rna 505.0 504.8 161 NIPPLE CAMCO DS LANDING NIPPLE, 2.856- NO GO 2.812 GAS UFT: 5,947 10586.3 5,7574 52.54 NIPPLE CONGO W-1 SELECTIVE LANDING NIPPLE 2.812 10,596.4 5,7624 5236 ANCHOR K ANCHOR, RUN WITH PACKER 2.99 10,5973 5,7629 5234 PACKER BAKER SAB -3 PERMANENT PACKER(SEALATTACHED) 3.250 yy Lli 7,40e3 1. 10,613.4 5,7728 51.99 NIPPLE CAMI D LANDING NIPPLE, 2795" NO 0 MILLEDOUT TO 2800 2.001 10,6247 5,7798 5114 SOS BAKER SHEAR OUT SUB, ELMO WronnuT.-ig 3015 PERF on 0926195 GXBOFT:an2s i as Other In Hole (IAlireline retrievable plugs, valves, pumps, fish, etc.) Tap ITVD) Topinnl lisle e) (XNR) (°) I Des Com Ron gess ID Ili 10,620.0 S,JJ6.9 51.84 r,lU2J1d L1 -LI liner lined up into 3.5"tpg. Urer Top 9 IIJ.620 1.992 13WINdUl LINER TOP 8 I 10,982.0 5007.0 49.95 FISH 112" DMY on RK Latch Dropped in Rath@e 92311995 923tl995 G4i LIFT; 8.]3].3 Perforations & Slots Shot WB "i 'Garza Top lion) BM RVQ) Dees (shotWl r0pal spatial MB) Me) LmMtl Zone Dah I Type Com 10675.0 10,698.0 5,811.2 5,8257 OJ, 21`47 Tfil 4.0 APERF MUTEEZED CL 7SED 61302887 Refill1QY83 10,680.0 14,777.0 5,8144 C<,21`47 12/12/2018 TM -Md MCHOR:IO,MA liner Maters: 1¢597.3 10,720.0 10,740.0 5,839.6 5,852.2 A-3. 2T-37 926/1995 4.0 (PERFrientetl tleg. deg. 1 lowside of hole NIPPLE; Iga13A Clement squeezes Topano) Blm(TUG) n TSP late) Rem ("B)lod"o ("a) Des sla G. Co. 10,6]5.0 1'6980 5,8112 56257 N 6130/2007 d qN U E E-MILLEDT 1 J 'W2.74" H SQUEEZE BIT sos, lgsza] Mandrel Inserts at .g 1-p! Lanny ;found4 1 mg N Te Top (ND) ry Mess MM G1 pp eery Tela Type IaOox Type vartyl:e rao von ,193 Run G01 Cam 2,194.3 2,1W. 2,006.3 00 CAMCO MMM 112 GAS LIFT GLV RK 0.188 0,1 1,193.0 12232018 400 Almost: ai..meo GSANGSOVEEZE: 10.8]50 nKa 2 5,34J.J 3,401. CAMGO MMM 112 GAS LIFT OV RK 0.250 0.0 1 018 100 3 7406.3 4,3067 CAMCO MMM 112 GAS LIFT DMY RK LOW 0.0 12/272018 1100 4 8,712.5 4,8555 CAMCO MMM 112 GAS LIFT DMV RK 0000 0.0 12/2612018 Mill- Note Lice bGdy DV 51 9,737.3 5,303.9 CAMCO MMM 1112 GAS LIFT OV RK 0188 00 12Y1997 630 6 10,541) 5,]30.1 CAMCO MMM 1112 GAS LIFT OMV RN 0.000 00 11172010 1200 mERF;1OM0,10.7400 Not": General & safety EnJ Dem Annadlion 21142003 NOTE. UNABLE TO GET GUNS DOWNHOLE -4140"MAX DEPTH 9/132011 NOTE: View lic Schoo wl Alaska 5chemalic?0 Lt LATERAL.. tq]M.91o.]89.0 )232012 NOTE: NOTABLE TOPULL OV AT 973TAFTER MANY ATTEMPTS 11102019 INDTE: View Schematic wl Alaska Schemalk 100 LI LATERAL', to,]W 419.0130 ass, asse parIdeal PRODUCRON', IN. 110]38 �4 CM2WUNERTOP, -- 0,82"0 slae.a w.lgeEonla.mo ConocoPhillips Alaska Inc. KUP PROD WELLNAME 2T-37 WELLBORE 2T -37L1 1111112014 ..70F!M�19 Z.. PM Casing Strings VM.�IVM�Eclaau0 c -RN Oescap5on ooilnl 101m1 TaP15NB� Sef oepm lPo(9) 9ef0.Plh iTvol... wNLen u._G,aa. TT Ll LATERAL 23/8 1.99 1070J.8 13,012.0 5,893.8 C60 L-80 STL Notes: Geneml & Safety ............ ...... ..................... .............._.............._......._...._.. XRxGFR: ffie Ena ou@ Mrwtalion tn0/2019 NOTE View Scnematic wl Alaska Schematic 10.0 Ul CONOVCTOR: 41 w210 NIPPLE; EMLP ePs uFr: ztad.3 SUEF E;<td .ItE,9 MnAVM - r pi b0. %wo OPS LIFT; E,Sli7 OP5 LIFT, 7I 3 GRB U". R712 G95 UR', 9.737.3 G46 U"; M. NIPPLE; IO RE 3 PNCNIX2 10.5484 PRCI(ER; f0.�7.3 NIPPLE, 10,5134 sos:lomdi L1a1 LATERPL', IDmeb u.m.o APERF; 10,515610,90 CSPNOSOVFEZEI 10.5750 IIY9 CTD 2 W LINER TOP, foemo •PERF', 10.]]00.10.i100�� SbWi Gro-, 10.®161'P o LIIATERPL',107 &10,7 fl Faooucnorv'. 55.7n1,5138 I1 I L1 urER .10. O 8-13,0120 KUP PROD WELLNAME 2T-37 WELLBORE 2T -37L1-01 Conoco`Phillips Alaska. im; zra]u-01, merml9zuaz vM Last Rev Reason Verb eassai shW) AnnoWitan End Date weninne Last MW By Rev Reason: Installed GI -0. Added❑ner Top Depth 2T-3JL1-01 iennalt ............................... .................._.............................. .......... Casing Strings RANGER; M6 ca:ins Dncriptlon oo lin) 1,0,W TOPMKF) Is. Depfh lrcNBl Lt -01 LATERAL 2318 1.99 1,1199 iBJTLO set PopM 1TV01...AUI 11...DrMe 5,8796 460 LA0 TOPThread STL Notes: General d Safety End DA.Aiaimn n 1/10/2019 NO T6 VIew Schematic wl Alaska Schematic 100 CONDUCTOR: NIPPLE. YfiO GAS LIFT: ZIW3 SURFACE, 4141, 145.] Minna Rud] -nii W. 06 8,13]0 GAS LIFT, S8 1 asaa.m: ],W 3 OASDFT: e]1zs GAS LIFT: 9,737,3 GAELI f012e NIPPLE. IO.M3 ANCHOR: 10591 PACNER: 10.5819 NIPPLE', 10,S1A< Is .R.7 CM 2 W LINER TOP. O.8A0 APEflF, f0.8]5.0.10.ESS 0 C-SAN0 sODEEZE:10,8150 B PRCODCTIOH: 38.]-I10]SB I 'L II II i ii II 1.1-0I LATERAL t081ea� u.m0 2T47 Current CTO Schematic 18'82- Mervae 121- MD edA'IOYL40 arvge Q 410.5' MD xOPa+D,eep MD x. xew KOP ®10,]10 MD Wa1frW 10,M.10 7W MD rzea.455 ervoe@ n,o24•MD sem'-• yIn' Cemno DS Mpple Q 505' RKB (2.81T ID) }12 SIN Ld EUE M Tubing toeurleca VM' Ca=0 MAG gas li0 tuanatel at 219Q 5J48', 7408, 8210', 9MT, 10,540'RKS Camw IKt SeleoSw Nipple ®10.588' IRKS (2.81T 0) K Anc00r@I0.9 RKB Bekar SASS Pecker ®10,59T RKB D apple at 10SIT IAD (miled out to 2.80" Iry ID. NaGo) Y1K Bekpr SOS ®10.825' RKB zranw+w+ TOe�.tq 9itl®+D,1bl Yq nanln+Tp•+am MD 14...a RV DMDlIPMD wa.rM„w M0 . BJl• t1, Operations Summary (with Timelog Depths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our(ho Phase Op Code Acmrty Code Time P -T-% Operation (WS) End Depth(11Ka) 11/20/2018 11/20/2018 3.50 MIRU MOVE RURD P Raise stairs & landings, lift & secure 0.0 0.0 12:00 15:30 beaver slide. disconnect PUTZ, disconnet hi -litre, check tree bolts, continue RD checklist 11/20/2018 11/20/2018 1.50 MIRU MOVE RURD P Complete RD check list, trucks arrive 0.0 0.0 15.30 17:00 at 16:30, pre job. 11/202018 11/20/2018 2.30 MIRU MOVE RURD P Jack and pull service mod to edge of 0.0 0.0 17:00 19:18 pad, install jeep. Jack and pull sub mod forward - 5', Replace tree cap, pull sub Completely off well, stage at edge of pad, install jeep. Perform environmental walk down with D50. 11/20/2018 11/20/2018 1.90 MIRU MOVE MOB P Roll off pad, Peak Crew change on the 0.0 0.0 19:18 21:12 access road - 10 min, continue on to CPF3 11/20/2018 11/21/2018 2.80 MIRU MOVE MOB P Enter main spine from CPF3 an rout to 0.0 0.0 21:12 00:00 2T-37 11/21/2018 11/21/2018 3.30 MIRU MOVE MOB P Arrive at 2T -Pad 0.0 0.0 00:00 03:18 11/21/2018 11/21/2018 0.40 MIRU MOVE MOB P Drop off sub jeep, lay pit liner, drop 0.0 0.0 03:18 03:42 dozer 11/21/2018 11/21/2018 0.80 MIRU MOVE MOB P Spot sub over well & lay mats 0.0 0.0 03:42 04:30 11/21/2018 11/21/2018 2.00 MIRU MOVE MOB P Crew change, turn pits around, hook 0.0 0.0 04:30 06:30 up cat to sow, spot pits, lay mats 11/21/2018 11/21/2018 2.50 MIRU WHDBOP MOB P Drop stairs & landings, connect PUTZ. 0.0 0.0 06:30 09:00 begin RU, NU BOPE •• Rig Accept 9:00 AM 11/21/2018 11/21/2018 1.00 MIRU WHDBOP RURD P Change out annular preventer 0.0 0.0 09:00 10:00 11/21/2018 11/21/2018 1.00 MIRU WHDBOP RURD P Energize Koomey, MU tiger tank hard 0.0 0.0 10:00 11:00 line, spot half -way house & shop 11/21/2018 11/21/2018 1.60 MIRU WHDBOP RURD P Complete RU, grease master, swab, & 0.0 0.0 11:00 12:36 tango valves, fluid pack lines & stack, clear floor, place barricades 11/21/2018 11/21/2018 0.40 MIRU WHDBOP BOPE P Shell test, good, PJSM 0.0 0.0 12:36 13:00 11/21/2018 11/21/2018 3.00 MIRU WHDBOP BOPE P Testing BOP'S, Test witnessed by 0.0 0.0 13:00 16:00 AOGCC Adam Earl, test to 3500 psi / 2500 psi Upper 2" Fail Pass 11/21/2018 11/21/2018 2.50 MIRU WHDBOP BOPE P Install test joint, continue BOP test 0.0 0.0 16:00 18:30 completeBOP test - 5:30 him 11/21/2018 11/21/2018 2.50 SLOT WELLPR CTOP P Adjust tree and stack, struggle a bit 0.0 0.0 18:30 21:00 with leaning tree. Make up nozzle, stab on and line up to reverse circ, test inner reel iron / stripper- good. 11/21/2018 11/21/2018 0.60 SLOT WELLPR CTOP P Test DS PDL/ tiger tank line, 0.0 0.0 21:00 21:36 11/21/2018 1122/2018 2.40 SLOT WELLPR CTOP P Instal night Cap, lock out and cut e- 0.0 0.0 21:36 00:00 line, boot, stab on, pump slack, ramp up pump rate 3 times, unstabed, cut coil, found wire @ 1 ft back. Cut 20' of Foil. rehead. 11/22/2018 11/22/2018 SLOT 0.0 0000 0000 Page 1127 ReportPrinted: 12/26/2018 operations Summary (with Timelog L/epths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Time End Time our (hr) Phase Op Code Adivdy Code Time P -T -X Opeadon (ftKB) End Depth(ttKB) 11/2212018 11/22/2018 2.20 SLOT WELLPR CTOP P Complete instil of CC, pull lest good, 0.0 0.0 00:00 02:12 retread, test wire 2000/66, PT - good, Pumped open SSV and installed fusible cap. Measure coil thickness per SOP 0.208, 0.201, 0.206, & 0.204" 11/22/2018 11/22/2018 3.40 SLOT WELLPR PULD P PJSM, Tubing pressure 1646 psi. IA 0.0 55.0 02:12 05:36 1584 psi. Line up dow the tubing with seawate, bullhead 97 bbls @ 3 bpm, circ pressure 1700 psi fell to 750 psi. Bled A to 1360 psi. PU & PD BHA#1, clean out assembly w D331 ridge set - 2.80" go / 2.79" no go. 11/22/2018 11/22/2018 2.40 SLOT WELLPR TRIP P RIH w/ BHA#1 Cleanout Assembly, 55.0 10,510.0 05:36 08:00 1.2 bpm, erratic returns (gas), 80 fpm PUW = 18K @ 3030', PUW = 28K @ 6000', PUW = 38K @ 9000' 11/22/2018 11/22/2018 0.20 SLOT WELLPR CLOG P Log K1 for+6' correction, close EDC 10,510.0 10,545.0 08:00 08:12 11/22/2018 11/22/2018 0.30 SLOT WELLPR TRIP P Continue RIH, pumping 1.8 bpm FS = 10,545.0 10,765.0 08:12 08:30 331 psi, CWT = 15K, PUW = 42K @ 10,627' ( just past D -nipple), 11/22/2018 11/22/2018 0.10 SLOT WELLPR TRIP P PUH, PUW = 48K @ 10,765', 1.85 10,765.0 10,510.0 08:30 08:36 bpm, still circulating out gas & well bore fluids 11/22/2018 11/22/2018 0.10 SLOT WELLPR CLOG P Log K1 for 0' correction, prep tool for 10,510.0 10,546.0 08:36 08:42 CCL 11/22/2018 11/22/2018 0.30 SLOT WELLPR CLOG P Perform CCL (10,510 to 10,725') 10,546.0 10,765.0 08:42 09:00 11/22/2018 11/22/2018 2.30 SLOT WELLPR TRIP P POOH, PUW = 40K, displacing to 10,765.0 55.0 09:00 11:18 used PowerPro, losing -0.4 bpm, open EDC. PJSM 11/22/2018 11/22/2018 1.30 SLOT WELLPR PULD P PUD BHA#1, stripped allen head on 55.0 0.0 11:18 12:36 bleed port (resolve) 11/22/2018 11/22/2018 1.00 SLOT WELLPR RGRP T Adjust riser alignment, swap out 3' & 0.0 0.0 12:36 13:36 V riser for one 4' riser. 11/22/2018 11/22/2018 1.20 PROD1 RPEQPT PULD P PJSM, PU & begiin PD BHA#2 HEW 0.0 73.0 13:36 14:48 11/22/2018 11/22/2018 1.00 PROD1 RPEQPT PULD T Unable to raise mast, trouble -shoot, 73.0 73.0 14:48 15:48 combinatioin of wind & hanging weight of PDL was not allowing raising of mast. Raised PDL's & mast raised 11/22/2018 11/22/2018 0.60 PROD1 RPEQPT PULD P Complete PD BHA#2, slide in cart, 73.0 73.0 15:48 16:24 1 1 MU to coil, tag up, set counters 11/22/2018 11/22/2018 2.30 PROD1 RPEQPT TRIP P RIH w/ BHA#2, EDC open, density 73.0 10,540.0 16:24 18:42 out erratic, taking returns to TT, Bullhead 30 bbl 150K LSRV pill 11/22/2018 11/22/2018 0.20 PRODi RPEQPT CLOG P Tie into he K1 for a +5' correction 10,540.0 10,587.0 18:42 18:54 11/22/2018 11/22/2018 0.30 PROD1 RPEQPT WPST P WH, 123 psi, IA 1136 psi, OA 82 psi. 10,587.0 10,718.8 18:54 19:12 RIH to 10,718'. PU, 45 k lbs. RBIH to WS setting depth 10718.78'. PU to neautral weight, CT 36.9 k lbs, zero WOB, Stage pump up, sheared at 3900 psi.S/D 4.5 k Ibs WOB, PU 44 k Ibs. HEW set. TOW @ 10,710' Page 2127 Report Printed: 12/26/2018 tiperations Summary (with Timelog uepths) rTr ' 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stag Tote End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (WB) End Depth(ft)(8) 11/22/2018 11/22/2018 2.00 PROD1 RPEOPT TRIP P PU, bullhead 30 bbl -100 k SRV, open 10,718.8 80.0 1912 21:12 EDC, Circulate bottoms up to the tiger tank. Pumping 2 bpm, loses 0.75 bpm, Bleed IA from 1140 psi to 962 psi over an hr. POOH losses @- 0.25 bpm. 11/22/2018 11/22/2018 1.50 PROD1 RPEQPT PULD P PJSM, bump up. PUD BHA#2 while 80.0 0.0 21:12 22:42 pumping managed pressure. 11/22/2018 11/23/2018 1.30 PROD! WHPST PULD P PU & PD BHA#3, window milling 0.0 80.0 22:42 00:00 asssembly, WFD 1' fixed bend motor. 2.80" No go 11/23/2018 11/23/2018 0.70 PROW WHPST PULD P PU & PD BHA #3 bump up, set 0.0 82.0 0000 0042 counters. 11/23/2018 11/23/2018 2.30 PROD1 WHPST TRIP P RIH W BHA# 3. 82.0 10,550.0 0042 0300 S/D @ 9223', 9285', 9566', PU's 37 k lbs. Close EDC, Pumps @ 0.8 bpm, continue in hie withou issue 11/23/2018 11/23/2018 0.20 PROD1 WHPST DLOG P Tie into 1<1 for a +T correction. 10,550.0 10,576.0 03:00 03:12 11/23/2018 11/23/2018 0.20 PROD1 WHPST WPST P PU Wt 44 k lbs. RIH ad dry tag TOB 10,576.0 10,714.2 03:12 03:24 @ 10,714.9' PU, 41 k lbs, CT 3976 psi, @ 1.89 bpm in, 1.29 bpm out - full open choke, WH 5 psi, IA 957 psi, OA 80 psi. Free spin diff 764 psi, CT Wt 14.4 k lbs, see motor work at 10,714.22 11/23/2018 11/23/2018 0.90 PROD! WHPST WPST P CT 3976 psi, @ 1.89 bpm in, 1.29 10,714.2 10,715.2 03:24 04:18 bpm out - full open choke, Free spin diff 764 psi, CT Wt 14.4 k lbs, WOB 0.94 k lbs 11/23/2018 11/23/2018 1.70 PROD1 WHPST WPST P Engage auto drill 10,715.2 10,7167 04:18 06:00 CT 4053 psi @ 1.88 bpm in, 1.42 bpm out. CT Wt 13.2 k lbs, WOB 1.35 k lbs - ROP = 1 ft/hr 11/23/2018 11/23/2018 1.70 PROD1 WHPST WPST P Milling, CWT =11.6K, WOB =1.5K, 10,716.7 10.718.5 06:00 07:42 1.9 bpm in, 1.5 bpm out, dp = 887 psi, bleed down IA to 757 psi Mill exits 7" casing, call BOW @ 10,717.2', TOW @ 10,714.2' pump sweeps " Pre-load PDL (Build BHA) 11/23/2018 11/23/2018 1.80 PROD1 WHPST WPST P Milling rat-hole. CWT= 13.81K, WOB = 10,718.5 10,739.0 07:42 09:30 2K, 1.9 bpm in, 1.57 bmp out, dp = 808 psi, circ = 4051 psi, TO rat-hole = 10,739' (29' from TOWS) 11/23/2018 11/23/2018 1.00 PROD1 WHPST REAM P Perform reaming passes, PUW = 40K, 10,739.0 10,739.0 09:30 10:30 HS, 30°R, 30'L (all down passes at HS), sand in samples from rat-hole TD, Dry drift up & down, clean, tag bottom. PUW = 40K 11/23/2018 11/23/2018 0.30 PROD1 WHPST TRIP P Begin POOH, lose hi-line power, shut 10.739.0 10,739.0 10:30 10:48 I I in choke, MP5 & MP9 Page 3/27 ReportPrinted: 12/26/2018 r operations Summary (with Timelog Lfepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time Our(hp Prate Op Code AcM1mty code Time P -T -X Opembmn (Wls) End Depth(ftKe) 11/23/2018 11/23/2018 1.10 PROD1 WHPST WAIT T Work to resolve issue, unable to pump 10,739.0 10,548.0 10:48 11:54 with power down, HMI screens down, etc, fire up generators, difficulty getting on gen power, reaquire hi -line powerm, EMW dropped to 9.7 ppg with pumps off line 11/23/2018 11/23/2018 0.50 PROD1 WHPST WAIT T RBIH to 10,690', begin circulafing 10,548.0 10,690.0 11:54 12:24 bottoms up, 18 Not above bit, again lose hi -line, successfully get on generator power At second power failure: BHP = 3430 psi, WHP = 522 psi, MD = 10,585', time= 12:15 11/23/2018 11/23/2018 2.60 PROM WHPST TRIP P POOH, circulating bottoms up, tag up, 10,690.0 77.0 12:24 15:00 PJSM 11/23/2018 11/23/2018 1.30 PROM WHPST PULD P PUD BHA#3, worked to pull down 77.0 0.0 15:00 16:18 weight bar in PDL (frozen shieve), string reamer & mill came out 2.80" no -go, LD tools 11/23/2018 11/23/2018 0.70 PROD1 DRILL CIRC P MU nozzle & jet stack, unstab, break- 0.0 0.0 16:18 17:00 off nozzle 11/23/2018 11/23/2018 1.40 PROD1 DRILL PULD P PD BHA #4 Build/Tum Assembly (2.4` 0.0 72.0 17:00 18:24 AKO motor, RB P104 bit), slid in cart, MU to coil, tag up, set counters, check pack offs - good. 11/23/2018 11/23/2018 1.90 PROD1 DRILL TRIP P RIH 72.0 10,531.0 18:24 20:18 11/23/2018 11/23/2018 0.20 PROD1 DRILL DLOG P Tie into the Kl for+ 5.5' correction 10,531.0 10,559.1 20:18 20:30 11/23/2018 11/23/2018 0.20 PROM DRILL TRIP P Close EDC. PU Wt 48 k lbs, contiune 10,559.1 10,739.0 20:30 20:42 in hole. Slight WOB bobble as we transited the window, 10.721'. 11/23/2018 11/23/2018 1.80 PROD1 DRILL DRLG P CT 3846 psi, 1.85 bpm in, 1.61 bpm 10,739.0 10,920.0 20:42 22:30 out, free spin diff 568 psi. Annular 3486 psi, 11.46 ppg at the window. CT Wt 11.5 k lbs, WOB 2.0 k lbs, ROP 140-100 fit, hr. Pump 5 x5 sweep limed out to TD Losses @ 0.2 bpm while holding 11.47 ppg 11/23/2018 11/24/2018 1.50 PROD1 DRILL TRIP P PU Wt 51 it lbs. POOH chasing 10,920.0 3,252.0 22:30 00:00 sweeps to surface, jog 7", pull out of hole. -1 k WOB tug and motor work @ 10,538- 11/2412018 11/24/2018 0.60 PROD1 DRILL TRIP P PU Wt 51 k lbs. POOH chasing 3,252.0 72.0 00:00 00:36 sweeps to surface, jog 7", pull out of hole. -1 it WOB tug and motor work @ 10.538'. Holdig 11.5 ppg EMW. 11/24/2018 11/24/2018 1.90 PROM DRILL PULL P Bump up. PUD and LD BHA#4, 72.0 0.0 00:36 02:30 holding 11.5 ppg EMW. Reset crown saver and floor saver post power outage. Lower section of BHA hung up in tree, worked wire, tried pumping and worked wire, no luck. 5x5 PJSM for change of scope, pressure un deploy, plug into tool and rotate HOT 180'. Stab PDL, pull with no luck, prep to pump again, had not pumped and BHA pulled free with no overfull. Continued to PUD / LD. Bit came out 2/4. chipped reamers from swinging bit with high bend out of hole. Page 4127 Report Printed: 1 212 6/2 01 8 operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth StartTime End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation dtK8) End Depth (ftK8) 11/24/2018 11/24/2018 1.40 PROM DRILL PULD P PU& PD BHA#5, L1 drilling assembly 0.0 80.0 02:30 03:54 0.5° AKO W BH P104 cutters, check pack offs -good, 11/24/2018 11/24/2018 2.10 PROD1 DRILL TRIP P RIH 80.0 10,540.0 03:54 06:00 Park @ 500', Close EDC. shallow test agitator. "Note computer had issues restarting SARA monitoring program, possibly from yesterdays black outs. rate (bpm) Diff pressure (psi) 1.0 377 1.5 717 1.9 1030 11/24/2018 11/24/2018 0.10 PROM DRILL DLOG P Tie into th K1 for +4.5' correction, 10,540.0 10,558.0 06:00 06:06 PUW =43K 11/24/2018 11/24/2018 0.30 PROM DRILL TRIP P Continue RIH. log RA tag. confirm 10.558.0 10,920.0 06:06 06:24 bottom of window @ 10.717' (RA @ 10,717") 11/24/2018 11/24/2018 2.10 PROM DRILL DRLG P Drilling, FS = 983 psi @ 1.88 bpm, 1.7 10.920.0 11,320.0 06:24 08:30 bpm out, CWT = 14K, WOB = 2K, BHP = 3528 psi, WHIP = 9 psi, circ = 4729 psi, pump 5x5 sweeps, avg ROP = 190 fph 11.8 ppg @ window, 1.87 bpm in, 1.72 bpm out, -9 bph losses 11/24/2018 11/24/2016 0.20 PROD1 DRILL WPRT P Wiper up -hole to EOB, PUW =45K 11,320.0 10,920.0 08:30 0842 11/24/2018 11/24/2018 0.20 PROM DRILL WPRT P Wiper in-hole, RIW = 14K 10,920.0 11,320.0 08:42 08:54 11/24/2018 11/24/2018 0.40 PROM DRILL DRLG P Drilling, FS = 991 @ 1.88 bpm, 1.77 11,320.0 11,448.0 08:54 09:18 bpm out, CWT = 9.5K, WOB = 2.6K. BHP = 3621 psi, WHIP = 80 psi, cm; = 5000 psi, IA = 766 psi, OA = 108 psi 11/24/2018 11/24/2018 0.20 PROD1 DRILL WPRT P 200' wiper, PUW = 56K, RIW = 13K 11,448.0 11,448.0 09:18 09:30 11/24/2018 11/24/2018 0.50 PRODt DRILL DRLG P Drilling, FS = 1050 psi, CWT= 12K, 11,448.0 11,550.0 09:30 10:00 WOB = 1.5K, BHP = 3666 psi, WHIP = 52 psi Go on 100% losses @ 11,500'. PUW = 51 K, annular dropped to 3380 psi 11/24/2018 11/24/2018 0.50 PROM DRILL WPRT P Wiper to 7" casing to circulate 11,550.0 10,699.0 10:00 10:30 bottoms up, pump 5x5 sweeps 11/24/2018 11/24/2018 0.80 PROM DRILL CIRC P Circulate bottoms up (allow sweeps to 10,699.0 10,699.0 10:30 11:18 exit), 1.88 bpm in, 1.5 bpm out, 11.8 ppg @ window (rate out increasing while in 7", likely pushing cuttings toward theif zone & healing) 11/24/2018 11/24/2018 0.50 PROM DRILL TRIP P W/ backside cleaned up, RBIH to drill 10,699.0 11,550.0 11:18 11:48 in attempt to heal losses Stack on TOWS, PU, roll bit, get by clean log RA for +1.5' correction RIW = 14.7K 11/24/2018 11/24/2018 0.60 PROD1 DRILL DRLG P Drilling, FS = 994 psi @ 1.85 bpm in. 11,550.0 11,643.0 11:48 12:24 1.3 bpm out, CWT = 12K, WOB = 1.31K, BHP = 3638 psi, WHIP = 98 psi, circ = 4555 psi 11,561' rate out drops to .8 bpm, builds to 1.25 bpm by 11,642', pull BHA wiper, PUW =49K Page 5127 ReportPrinted: 1V26/2018 operations Summary (with Timelog Liepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time lag start Deprh Start Time EM Time Dur (hr) Phase Op Code Aavity Code Time P -T -X Opembon (MIS) Eno Depth (ftKa) 11/24/2018 11/24/2018 1.00 PROD1 DRILL DRLG P Drilling, hit something hard, ROP 11,643.0 11,782.0 12:24 13:24 down to 12 fph (11,643'- 11,647'), CWT = 2K, WOB = 2K, BHP = 3577 psi, WHIP = 48 psi, circ = 4491 psi, -66% returns, avg ROP 139 fph 11/24/2018 11/24/2018 0.20 PROD1 DRILL WPRT P Wiper to fault at 11,550'. PUW = 51 K, 11,782.0 11.782.0 13:24 13:36 RM = 12K 11/24/2018 11/24/2018 1.20 PROD1 DRILL DRLG P Drilling, CWT = 10K, WOB = 1.81K, 11,782.0 11,940.0 13:36 14:48 BHP = 3660 psi, circ = 4971 psi, 1.85 bpm in, 1.38 bpm out. PUW = 58K @ 11,940', pump 5x5 sweeps, -72% returns, avg ROP = 132 fph 11/24/2018 11/24/2018 0.40 PRODI DRILL WPRT P Wiper to window, PUW =49K, slight 11,940.0 10,690.0 14:48 15:12 heavy pull through window 11/24/2018 11/24/2018 0.90 PROD1 DRILL CIRC P Circulate bottoms up, 1.88 bpm in, 1.4 10.690.0 10,690.0 15:12 16:06 bpm out, with bottoms up, swap to hi - line (engineers on site), engineers see no anomolies 11/24/2018 11/24/2018 0.60 PROD1 DRILL WPRT P Wiper in-hole, log RA for+2' 10,690.0 11,940.0 16:06 16:42 correction, issues w/ hi -line, pull back into 7", swap back to generators, RIH, setdown @ BOW, PU, setdown again, spin bit, through clean 11/24/2018 11/24/2018 1.90 PRODt DRILL DRLG P Drilling, FS = 1100 psi @ 1.88 bpm, 11,940.0 12,136.8 16:42 18:36 CWT = 2K, WOB = 2.3K, BHP = 3677 psi, WHIP = 78 pis, circ = 4845 psi 11/24/2018 11/24/2018 0.10 PROD1 DRILL WPRT P Put short 100'wiper, PU Wt, 51, had 12,136.8 12,136.8 18:36 18:42 to start of a death spiral - diff sticking 11/24/2018 11/24/2018 1.20 PROM DRILL DRLG P Drilling 12,136.8 12,355.0 18:42 19:54 CT 4600 psi, FS = 1113 psi @ 1.9 bpm in 1.6 bpm out, CWT = 7K, WOB = 1.6 K, pump 5x5 ROP over interval - 182 ft/hr 11/24/2018 11/24/2018 0.30 PROW DRILL WPRT P PU as sweeps exit, PU Wt 49 k lbs 12,355.0 11,440.0 19:54 20:12 Chase sweeps up hole. 915' wiper to above the thief zone. Wiper #1 11/24/2018 11/24/2018 0.40 PROD1 DRILL WPRT P RBIH, 11,440.0 12,355.0 20:12 20:36 CT RIH Wt 11 k lbs 11/24/2018 11/24/2018 2.20 PROM DRILL DRLG P CT 4765 psi, @ 1.89 bpm in, 1.48 12,355.0 12,665.0 20:36 22:48 out, free spin 1149 psi, annular 3770 psi, CT Wt 10 k bs, WOB 1.3 k ROP over interval - 136 ft/hr PU's, 12,497 - 51 k, 12,550 51 k lbs, 12.595 60 k lbs, Starting to see weight transfer issues and more frequent pick ups, pump 5x5 in prep to pull wiper early. 11/24/2018 11/24/2018 0.30 PROM DRILL WPRT P PU as sweeps exit, PU Wt 49 k lbs 12,665.0 11,864.0 22:48 23:06 Chase sweeps up hole, 800' wiper lWiper#2 11/24/2018 11/24/2018 0.40 PROD1 DRILL WPRT P RBIH. 11,864.0 12,665.0 23:06 23:30 CT Wt 10 k lbs 11/24/2018 11/24/2018 0.30 PROD1 DRILL DRLG P CT 4822 psi, @ 1.88 bpm in , 1.53 12.665.0 12,721.0 23:30 23:48 out, free spin 1144 psi, annular 3742 psi, CT Wt lO k bs, WOB 1.3k 11/24/2018 11/25/2018 0.20 PROW DRILL WPRT P PU Wt 55 k lbs 12.721.0 12.626.0 23:48 00:00 1 short 200' wiper RBIH Page 6127 Report Printed: 1212612018 Uperations Summary (with Timelog Depths) y 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (no Phase Op Code ACfi,ty Cotle Time P -T -X Operation OMB) End Depth (WB) 11/25/2018 11/25/2018 0.20 PROD1 DRILL WPRT P Continue to RBIH 12,626.0 12,721.0 00:00 00:12 11/25/2018 11/25/2018 1.60 PROD? DRILL DRLG P WH 0 psi, IA 767 psi, OA 125 psi 12,721.0 12,915.0 00:12 01:48 CT 4757 psi. @ 1.88 bpm in, 1.54 out, free spin 1079 psi, annular 3783 psi, CT Wt 7.8 k bs, WOB 1.1 k lbs. 11/25/2018 11/25/2018 0.40 PROM DRILL DRLG P @ 12,915'retums rapidly fell from 12,915.0 12,941.0 01:48 02:12 1.54 bpm to 0.47 bpm Dril ahead watching returns hoping for healing PU'S 12913 - 52 k lbs 12939 - 56 k lbs 12,941 - 58 k lbs 11/25/2018 11/25/2018 0.90 PROM DRILL WPRT P PU on early wiper to window for tie in 12,941.0 10,688.0 02:12 03:06 1k neg WOB pull @ 11,434' Returns healed in a linear manner from 0.47 bpm to 1.3 bpm ECD @ the windo tracked a similar trend from 11.1 ppg back to 11.6 ppg Drive by the RA tag for a +11' offset, did not reset counters. -2 k WOB tug @ 10,714 as we transited the window. 11/25/2018 11/25/2018 1.00 PROW DRILL CIRC P Jog the 7", pump5x5 and circ bottoms 10,688.0 10,663.0 03:06 04:06 up. Sweep didnt cary much solids to he shaker. 11/25/2018 11/25/2018 0.30 PROD1 DRILL DLOG P RBIH, SO @ 10,707 corrected to 10,663.0 10,758.0 04:06 04:24 10,719' PU to just above window, roll pump to 1.6 bpm, RBIH, window clean. Log RA tag for 11/25/2018 11/25/2018 0.70 PROD1 DRILL WPRT P RBIH. RIW = 10.3K 10,758.0 12,941.0 04:24 05:06 11/25/2018 11/25/2018 1.00 PROD1 DRILL DRLG P Drilling, FS = 1078 psi @ 1.9 bpm, 1 12,941.0 13,021.0 05:06 06:06 bpm out, CWT = 4.3K, WOB = 1.2K, BHP = 3571 psi, circ = 4832 psi, drilling to heal losses 11/25/2018 11/25/2018 0.50 PROD1 DRILL DRLG P Crew change, drilling, FS = 1025 psi 13,021.0 13,072.0 06:06 06:36 @ 1.77 bpm, 0.8 bpm out, CT = 6K, WOB = 1.3K, BHP= 3583 psi, circ = 4475 psi Returns @ 40% after 157' drilled, confer w/ town, decison made to drill on closed choke, pump 5x5 sweeps, await sweeps to bit 11/25/2018 11/25/2018 1.10 PROM DRILL WPRT P Wiper to window, PUW=56K, clean 13.072.0 10,690.0 06:36 07:42 through window 11/25/2018 11/25/2018 0.80 PROD1 DRILL CIRC P Circulate bottoms up (2 sets of sweep 10,690.0 10,690.0 07:42 08:30 exit), 1.87 bpm in , 1.24 bpm out in cased hole, close choke, bull -head 20 bbl (down coil) to theif zone @ 12,916, WHP up to 886 psi @ 1.6 bpm (11.9 ppg @ window) 11/25/2018 11/25/2018 0.90 PROD1 DRILL TRIP P RBIH to drill on closed choke, log RA 10,690.0 13,072.0 08:30 09:24 1 1 1 1 for +2' correction Page 7127 Report Printed: 1212612018 operations Summary (with Timelog Liepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Star ima End Time our IN) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth(fiKB) 11/25/2018 11/25/2018 0.90 PROM DRILL DRLG P Drilling, FS= 1101 psi @ 1.88 bpm. 13,072.0 13.171.0 09:24 10:18 WHP = 476 psi. CWT = 12.8K, annular = 3623 psi (11.6 ppg EMW), difficulty dropping inclination, allow weight to drill off, attempting to "wallow" small depression to allow downward progression (per DD), reduce WOB in attempt to drop 11/25/2018 11/25/2018 0.10 PRODi DRILL WPRT P BHA wiper, PUW = 52K, RIW = 9K 13.171.0 13,171.0 10:18 10:24 11/25/2018 11/25/2018 2.40 PROM DRILL DRLG P Dirlling, FS = 1127 psi @ 1.85 bpm, 13171.0 13,330.0 10:24 12:48 BHP = 3640 psi, WHP = 565 psi, circ = 4538 psi, closed choke Continue attempting to drop inclination @ reduced WOB & ROP per DD, begin succesffully dropping inclination. PUW = 62K from 13,257' 11/25/2018 11/25/2018 0.90 PROD? DRILL DRLG P Drilling, BHP = 3675 psi (11.83 EMW), 13,330.0 13,386.0 12:48 13:42 WHP = 701 psi, circ = 4759 psi, CWT = -3.2K, WOB = 1.3K PUW = 50K @ 13357' 11/25/2018 11/25/2018 0.40 PROM DRILL WPRT P Wiper to above thief zone, PUW = 13,386.0 13,386.0 13:42 14:06 1 58K, RIW = 9K 11/25/2018 11/25/2018 3.20 PROM DRILL DRLG P Drilling, CWT = 7K, WOB = 1.3K, BHP 13,386.0 13,600.0 14:06 17:18 = 3672 psi, WHP = 773 psi, circ = 4786 psi, PU off bottom from 13,332', allow geology to confer w/ town, go back to drilling 11/25/2018 11/25/2018 1.10 PRODt DRILL WPRT P TD, pump sweeps while PUH into 7" 13,600.0 10,681.0 17:18 18:24 Saw -941 WOB tug as we puled past 12,922 - suspect theif zone. 11/25/2018 11/25/2018 0.30 PROD1 DRILL DLOG P Park at 10681.88' MD, 5785.16 TVD 10,681.0 10.681.0 18:24 18:42 Trap 3496 psi and watch fall to 3395 psi - 11.3 ppg EMW over 13 minute. Pressure trend is contiuning to drop. 11/25/2018 11/25/2018 0.30 PROM DRILL DLOG P RIH, Tie into the RA tag for +4' foot 10.681.0 10,796.1 18:42 19:00 correction. Window clean. 11/25/2018 11/25/2018 0.90 PROM DRILL TRIP P RIH, hole clean. 10,796.1 13,602.0 19:00 19:54 Trend change in annular pressure @ 121 constant pressure jumpped to 3628 psi to 3655 psi 11/25/2018 11/25/2018 1.60 PROM DRILL DISP P PUH laying in liner running pill - 31.5 13.602.0 9,377.0 19:54 21:30 bbls., top of pill @ 12,255' Panting flags, Yellow TO @ 12,383', slight -800 lb WOB tug while pulling through the window @ 10707'. White window @ 9378' Open EDC, continue out of hole pumping mud @ 0.70 bpm, against a closed choke, replacing pipe voidage, holding 11.7 ppg EMW @ the window, losing —0.25 bpm. 11/25/2018 11/25/2018 1.40 PROD1 DRILL TRIP P POOH, time out weighted liner running 9,377.0 95.0 21:30 22:54 pill prior to bumping up. 11/25/2018 11/26/2018 1.10 PRODt DRILL DISP P Bullhead remaining LRP down coil @ 9,377.0 95.0 22:54 00:00 1.23 bpm, WH 1378 psi, CT 4205 psi, ECD @ the window 12.5 ppg. Page 8127 ReportPrinted: 1 212 612 01 6 V operations Summary (with Timelog Liepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depen Steri Time End Time Dur(hr) Phase Op Cade Activity Code Time P -T -x Operation (fU(B) End Depth(flRB) 11/26/2018 11/26/2018 0.80 PROD1 DRILL DISP P Complete bulhead kill. PJSM while 95.0 95.0 00:00 00:48 Wellhead bleeds down. Crack valve on riser to half drum, OWFF. no flow 11/26/2018 11/26/2018 1.20 PROD1 DRILL PULD P LD BHA#5 over a dead well, examine 95.0 0.0 00:48 02:00 pipe above connector - good. 4bbl per hr losses. Bit graded 1/2 broken reamers, plugged nozzle. 11/26/2018 11/26/2018 0.40 COMPZI CASING PUTB P Prep floor to PU and run liner- losses 0.0 0.0 02:00 02:24 increased to 8 bbl/hr 11/26/2018 11/26/2018 2.50 COMPZI CASING PUTB P PU 40 joints 2-3/8"L-804.61b/ft 0.0 1,244.2 02:24 04:54 slotted liner, 1244.18', under a shortly capped with a non ported bull nose, (1,245.4' LOA). #30 on the hook @ 4:18 .."Losses @ 8 bbl/hr 11/26/2018 11/26/2018 0.90 COMPZ1 CASING PULD P PU BHA#6 Liner Running Tools, slide 1,244.2 1,289.0 04:54 05:48 1 1 1 in cart. MU to coil, tag up, set counters 11/26/2018 11/26/2018 2.30 COMPZI CASING RUNL P RIH w/BHA #6, correct-0.2'to 1,289.0 11,755.0 05:48 08:06 window flag, PUW = 46K, WOB = - 5.51K 11/26/2018 11/26/2018 0.10 COMPZI CASING DLOG P Log K1 for +6'difference, did not stop 11,755.0 11,779.0 08:06 08:12 pipe to correct 11/26/2018 11/26/2018 1.10 COMPZI CASING RUNL P Continue RIH, stack weight @ 11,779.0 13,012.0 08:12 09:18 12,513', PU & get by, stack @ 13,030' multiple times, attempt diffemt speeds, begin losing hole, PUH to 12,700', RBIH, slack @ -12,959', PU, make it to 13.012', PUW = 70K (-15K WOB), 11/26/2018 11/26/2018 0.70 COMPZI CASING RUNL P Unable to move liner up or down @ 13,012.0 13,012.0 09:18 10:00 13,012', Pull to 70K, -16K WOB, pull to 80K multiple times (-21K WOB), no good, confer w/ town, decsion made to release off liner, bring up pumps, release off liner. PUW = 41 K BOL = 13012' + 6' correction to Kt = 13,018', TOL @ -11.772.6- 11/26/2018 11/26/2018 3.00 COMPZ1 CASING TRIP P POOH, tag up, flow check, PJSM, 225 13,012.0 45.0 10:00 13:00 1 L I bbl KWF arrives at rig, 11/26/2018 11/26/2018 0.80 COMPZ1 CASING PULD P LD liner running tools BHA#6, losses 45.0 0.0 13:00 13:48 - 24 - 28 bph 11/26/2018 11/26/2018 0.50 COMPZI CASING WAIT P Get on hi -line power, PJSM for PU 0.0 0.0 13:48 14:18 liner 11/26/2018 11/26/2018 2.30 COMPZ1 CASING PUTB P PU Liner Run #2 (ported BN, 2 10' 0.0 940.0 14:18 16:36 pups, 30 jnts slotted liner, shorty deployment sleeve) 11/26/2018 11/26/2018 0.40 COMPZI CASING PULD P PU liner running tools BHA V, slide in 940.0 1,004.0 16:36 17:00 cart, MU to coil, check packoffs, tag up. set counters 11/26/2018 11/26/2018 2.80 COMPZI CASING RUNL P RIH w/ upper liner section, correct to 1,004.0 11,772.0 17:00 19:48 window flag +4.5', PUW = 47K, +1.5' offset from TD flag, arrive at setting depth, PUW = 47K, RBIH, bring up pumps, release liner, PUW = 42K, TOL -10,812' Page 9/27 Report Printed: 1 2 /2 612 01 8 operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op code Activity Cade Time P-T.% Operation (WS) End Depth (ftKB) 11/26/2018 11/26/2018 1.50 COMPZI CASING DISP P Begin to displace well to DuoVis, 11,772.0 10,690.0 19:48 21:18 difficulty lifting KWF to surface, decision made to bull-head DuoVis down back-side, line back up down coil, circulate to evaluate losses. holding 11.6-85% returns pumping 1.8 bpm Pre-load PDL w/ build BHA 11/26/2018 11/26/2018 1.90 COMPZI CASING TRIP P POOH, tag up, PJSM 10,690.0 45.0 21:18 23:12 11/26/2018 11/27/2018 0.80 COMPZI CASING PULD P PUD BHA#7 45.0 0.0 23:12 00:00 11/27/2018 11/27/2018 COMPZI CASING PULD P PUD BHA#8 45.0 0.0 00:00 00:00 11/27/2018 11/27/2018 1.50 COMPZI CASING PULD P PU& PD BHA#8, Anchored liner top 0.0 52.0 00:00 01:30 billet. Checked pac offs - good 11/27/2018 11/27/2018 2.20 COMPZI CASING TRIP P RIH, holding 11.4 EMW, losses - 0.25 52.0 10,540.0 01:30 03:42 bpm 11/27/2018 11/27/2018 0.20 COMPZI CASING CLOG P Tie into the K1 for a +5.5' correction. 10,540.0 10,570.0 03:42 03:54 "'Phase 3 called field wide 03:45 11/27/2018 11/27/2018 0.30 COMPZI CASING RUNL P PU Wt 42 k lbs @ 10.661, Close 10,570.0 10,795.0 03:54 04:12 EDC, RIH past window - clean, S/D 10,807' PU Wt 43 k lbs. S/D again, PU neutral wt 40 k, Verify oriented 30 ° ROHS, online w pump, sheared off at 3750 psi. S/D 2 k, PU Wt 44 k lbs, ... TOB @ 10795' Slips oriented 30" ROHS 11/27/2018 11/27/2018 2.00 COMPZI CASING TRIP P POOH replacing pipe void while 10.795.0 79.3 04:12 06:12 targeting 11.4 ppg EMW a@ the window. Losses -0.25 bpm 11/27/2018 11/27/2018 4.80 COMPZI CASING WAIT T Bump up, pump managed pressure 79.3 79.3 06:12 11:00 11.4 ppg EMW. - 10 bbis/hr loss rate ""Wait on weather 11/27/2018 11/27/2018 1.20 COMPZ1 CASING PULD P Phase 2 called, PJSM, PUD BA # 8 79.3 0.0 11:00 12:12 11/27/2018 11/27/2018 0.40 PROD2 STK BOPE P Performs BOP function test 0.0 0.0 12:12 12:36 11/27/2018 11/27/2018 1.90 PROM STK PULD P PU & PD BHA#9, L1-01 build/tum 0.0 78.0 12:36 14:30 drilling assembly. BHA deployed on ODS PDL, assembly hung up multiple times while trying to deploy. Eventually worked through. Checked pack offs, good- but found some old pack off material above brass, cleaned and ensured oilier was functional. 11/27/2018 11/27/2018 2.00 FROM STK TRIP P RIH 78.0 10,530.0 14:30 16:30 I 11/27/2018 11/27/2018 0.20 PROM STK CLOG P Tie in for+6.0' correction. PU wt 44 k 10.530.0 10,600.0 16:30 16:42 1 lbs, Close EDC 11/27/2018 11/27/2018 0.20 PROD2 STK DLOG P continue to RIH 10.600.0 10,795.5 16:42 16:54 Page 10127 Report Printed: 1212612018 operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Tvue End Time Dur(M) Phase Op cafe Activit' Code Time Pd-X Operation (flKa) End Depin rtKB) 11/27/2018 11/27/2018 1.10 PROD2 STK DLOG P CT 3937 psi @ 1.89 bpm in 1.69 bpm 10,795.5 10,798.5 16.54 18:00 out, 3419 psi annular, holding 11.2 ppg EMW. 480 psi free spin, CT Wt 11.2 ppg, tag billet at 10795.5, stall @ 10795.8, PU, RBI, time mill, bottoms up has aluminum in it, mill 1, 2, and 3' as per RP. 11/27/2018 11/27/2018 0.89 PROM DRILL DRLG P Drill ahead, seems to be stacking 10,798.5 10,810.0 18:00 18:53 weight, back off on DHWOB, still making hole, continue attempting to drill ahead by WOB. 11/27/2018 11/27/2018 1.55 PROM DRILL DRLG P Increase ROP up to 60-80 fph, with 10.810.0 10,886.0 18:53 20:26 2.6 k DHWOB, pump pressure=4,013 psi, WHP=122, INMM=1.89 bpm, OMM=1.67 bpm, still maintaining 11.2 ppg at the window. 11/27/2018 11/27/2018 0.8O PROD2 DRILL WPRT P TD build/turn, pump 5x5 sweep, pull 10,886.0 10,710.0 20:26 21:14 up hole, PUW 51 k, drift KOP, 1.4 k bobble at 10,810', billet is clean. POOH, PUW 48 k 11/27/2018 11/27/2018 2.00 PROD2 DRILL TRIP P Jog the 7", open EDC above window, 10,710.0 78.3 21:14 23:14 1 1 contiue POOH 11/27/2018 11/28/2018 0.77 PROD2 DRILL PULD P PUD, build/turn BHA # 78.3 0.0 23:14 00:00 11/28/2018 11/28/2018 1.80 PROM DRILL PULD P PD lateral drilling BHA#10 w/BH 0.0 80.3 00:00 01:48 P104 and Ironside motor., check pao offs (changed) 11/28/2018 11/28/2018 2.10 PROD2 DRILL TRIP P Tag up, reset counters depths, RIH w/ 80.3 10,540.0 01:48 03:54 BHA#10 (Ironside), surface test agitator 1.87 bpm at 5,092 psi, Diff=1,360 psi. 11/28/2018 11/28/2018 0.20 PROD2 DRILL DLOG P Log the K1 formation marker 10,540.0 10,567.3 03:54 04:06 1 1 connection of plus 9.0' 11/28/2018 11/28/2018 0.20 PROD2 DRILL TRIP P Continue IH, set down 10,848', PUW 10,567.3 10,886.0 04:06 04:18 51 k, not correct TF, adjust TF RBIH past set down to bottom. 11/28/2018 11/28/2018 0.50 PROM DRILL DRLG P OBD, 1.9 bpm at 5,061 psi, Diff=1,265 10,886.0 10,888.0 04:18 04:48 psi, WHP=20, BHP=3,698, IA=757. OA=95, PUH, unable to drill ahead. DHWOB 1.0-5.0 k, heavy PU 63 k 11/28/2018 11/28/2018 2.00 PROD2 DRILL WPRT T PU to cased hole, circulate bottoms 10,888.0 10.622.0 04:48 06:48 up, jogged 7" while consulting with town. Clean black sand in the bottoms up. Increased the lubes in both hi and low vis pits to 282% 776 / Iowtorque. 11/28/2018 11/28/2018 0.40 PROD2 DRILL WPRT T Load 5x5 sweep in the coil and RIH. 10,622.0 10,719.0 06:48 07:12 S/D x5 limes @ 10,719' PU's 42 - 45 k lbs. Pick up and spin the bit after each S/D. Last PU 55 k lbs, -5 k WOB. 11/28/2018 11/28/2018 0.20 PROM DRILL DLOG T PUH and tie into the K1 for a +3.5' 10,719.0 10,567.6 07:12 07:24 correction 11/28/2018 11/28/2018 0.50 PROM DRILL TRIP T RBIH, S/D x210,722.5' 10,567.6 10,680.0 07:24 07:54 11/28/2018 11/28/2018 1.90 PROD2 DRILL TRIP T POOH for window dressing assembly, 10.680.0 88.4 07:54 09:48 MU new BHAw/o res tool and pre load drillers side PDL w window clean dressing assembly, park shallow, open EDC, bump up, space out. 11/28/2018 11/28/2018 1.00 PROM DRILL PULD T PUD BHA# 10, left BHA in ODS PDL. 88.4 0.0 09:48 10:48 Lay down Ironsides motor and agitator, Bit reamers werre hevily dammaged, graded 1/4. Page 11/27 Report Printed: 1212612018 operations Summary (with Timelog Liepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth I Start Time End Time Our (hr) Phase Op Code Actrmy Code Time P-T-X Operation (WEI) End Depth (flK0) 11/28/2018 11/28/2018 1.20 PROD2 DRILL PULD T PU and PD BHA#11, window dressing 0.01 65.0 10:48 12:00 assembly, Standard used window mill and string reamer, both 2.80 No Go. BH motor 1 ° AKO with the wear band turned in. 1.5' from tip of mill to bit box connection. 11/28/2018 11/28/2018 1.90 PROD2 DRILL TRIP T RIH 65.0 10,530.0 12:00 13:54 11/28/2018 11/28/2018 0.20 PROD2 DRILL DLOG T PU Wt 41 k lbs, Tie into the Kt for a - 10,530.0 10.557.0 13:54 14:06 5' correcion 11/28/2018 11/28/2018 1.40 PROD2 DRILL REAM T Close EDC, RIH, TF @ High Side 10.557.0 10,698.0 14:06 15:30 CT 3909 psi, @ 1.91 bpm in, 1.78 bom out, Diff 441 psi, 55% choke, WH 40 psi, 11.3 ppg EMW - annular 3415 psi, CT 13.5 k lbs. 10717.5 increase in WOB, +30-40 psi motor work. Tie into the RA tag for+3' correction. Back ream @ HIS from 10,474'to 10,716' RBIH, back ream @ 30° ROHS @ 1 ft/hr from 10,723' to 10,714' flop HIS RBIH, back ream @ 30` LOHS @ 1 Nhr from 10,723' to 10715.3' flop HIS RBIH, back ream @ 180 *ROHS @ 1 ft/hr from 10,727' to 10,715' PUH Dry drift clean. 11/28/2018 11/28/2018 1.90 PROD2 DRILL TRIP T POOH, open EDC 10,698.0 60.0 15:30 17:24 11/28/2018 11/28/2018 1.80 PROD2 DRILL PULD T Bump up, space out, inspect INJH 60.0 0.0 17:24 19:12 stripper (changeout pac-off), PUD BHA#11 11/28/2018 11/28/2018 0.80 PROD2 DRILL PULD T PD, lateral drilling BHA#12 0.0 80.3 19:12 20:00 11/28/2018 11/28/2018 0.20 PROD2 DRILL PULD T MU coil to CTT, perform surface test 80.3 80.3 20:00 20:12 (good-test), Tag up, reset counter depths. 11/28/2018 11/28/2018 0.30 PROD2 DRILL TRIP T RIH, perform surface test on agitator 80.3 550.0 20:12 20:30 11/28/2018 11/28/2018 0.40 PROD2 DRILL SVRG T Inspect pac-off assembly and goose 1,650.0 2,224.0 20:30 20:54 neck alignment 11/28/2018 11/28/2018 1.50 PROD2 DRILL TRIP T Continue IH 2,224.0 10,540.0 20:54 22:24 11/28/2018 11/28/2018 0.50 PROD2 DRILL DLOG T Log Ki marker, missed marker, 10,540.0 10,567.0 22:24 22:54 PBUH, re-start logging marker from 10,520', plus 28.5' 11/28/2018 11/28/2018 0.30 PROD2 DRILL TRIP T Jog in casing, circlating lubed 5x5 10,567.0 10,700.0 22:54 23:12 sweep to bit. 11/28/2018 11/28/2018 0.30 PROD2 DRILL TRIP T RIH thru window (clean 13 k CTSW), 10,700.0 10.886.0 23:12 23:30 set down @ 10,875'@ 10,878', work down to bottom, 0.6 bpm, bring pump up to FS 1.9 bpm at 5,200 psi, 11/28/2018 11/29/2018 0.50 PROD2 DRILL TRIP T PUW 58 k, work back to bottom @ 0.6 10,886.0 10.886.0 23:30 00:00 bpm, bring pump again, 4-6 k DHWOB, 11/29/2018 11/29/2018 1.00 PROD2 DRILL TRIP T Slowly moving towards bottom w/high 10,886.0 10,882.0 00:00 01:00 DHWOB, PUH 75 k, come down on pump get weight back, continue PUH 11/29/2018 11/29/2018 0.20 PROD2 DRILL TRIP T RBIH, stacking CTSW, high DHWOB, 10,882.0 10,886.0 01:00 01:12 park coil @ 10886'. 4-6 k DHWOB. Diff-2.000-2.1 00 psi, unable to drill ahead, PUH make call to TT for plan forward. Page 12127 Report Printed: 12/26/2018 Operations Summary (with Timelog Depths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time Er nrne our (hr) Phase Op Code AcWty Code Time P -T -X Operation (WO) End Depth(fiKa) 11/29/2018 11/29/2018 0.50 PROD2 DRILL TRIP T PUH 58 k, make call to TT, discuss 10,886.0 10,750.0 01:12 01:42 plan forward. 11/29/2018 11/29/2018 2.20 PROM DRILL TRIP T POOH 10,750.0 80.3 01:42 03:54 11/29/2018 11/29/2018 1.80 PROD2 DRILL PULD T PUD, drilling assembly#12, LD motor 80.3 0.0 03:54 05:42 agitator 11/29/2018 11/29/2018 0.30 PROD2 STK PULD T PU Anchored billet 0.0 0.0 05:42 06:00 11/29/2018 11/29/2018 0.80 PROM STK PULD T Crew change, PJSM, Scribe, Stab, 0.0 0.0 0600 06:48 QTS PT failed, top O-ring leaking by. 11/29/2018 11/29/2018 0.40 PROM STK PULD T PJSM, unstab, break tool, relace both 0.0 0.0 06:48 07:12 QTS O -rings. re scdve, stab, 11/29/2018 11/29/2018 0.90 PROD2 STK PULD T PD BHA#13, skid cart, stab inector, 0.0 83.0 07:12 08:06 tool test good, bump up, set counters. 11/29/2018 11/29/2018 1.80 PROD2 STK TRIP T RIH, 83.0 10,550.0 08:06 09:54 11/29/2018 11/29!2018 0.20 PROD2 STK DLOG T Tie into the K1 for+6.5' 10,550.0 10,578.1 09:54 10:06 11/29/2018 11/29/2018 0.30 PROM STK WPST T PU Wt, 47k, Close EDC 10,578.1 10,802.0 10:06 10:24 RIH through window, two sharp WOB spikes @ 10,751', and 10763' PU just under neutral, 42k lbs, online w/ pump, sheared @ 4000 psi, SID 3.8 k WOB @ 10802.8' 11/29/2018 11/29/2018 0.10 PROD2 STK TRIP T PU 55 k, pulled - 50 k slowly reduced 10,802.0 10,675.0 10:24 10:30 to 44k C Wt, no indication of dragging anything on WOB. 11/29/2018 11/29/2018 1.80 PROD2 STK TRIP T Park, reset depth, drop off pup length, 10,675.0 78.5 10:30 12:18 save billet as place holder for rod length. POOH 11/29/2018 11/29/2018 1.50 PROD2 STK PULD T Bump up, space out, PUD BHA#13. 78.5 0.0 12:18 13:48 11/29/2018 11/29/2018 1.70 PROM STK PULD T PU and PD BA#14, AL1 -01 build 0.0 78.0 13:48 15:30 drilling assembly. Check pack offs, reran. 11/29/2018 11/29/2018 1.90 PROD2 STK TRIP T RIH 78.0 10,530.0 15:30 17:24 11/29/2018 11/29/2018 0.20 PROD2 STK DLOG T Tie nto the K1 for a +5.5' 10,530.0 10,574.8 17:24 17:36 11/29/2018 11/29/2018 0.30 PROD2 STK TRIP T PU Wt 47 k Ibs Close EDC. 10,574.8 10,780.9 17:36 17:54 Continue to RIH, dry lag TOB @10,780' 11/29/2018 11/29/2018 0.50 PROM STK KOST T PUH, obtain pump parameters, 1.9 10,780.9 10,781.1 17:54 18:24 bpm at 4,150 psi, Diff=462 psi. BHP=3474, WHP=15, IA=755, OA=84, time mill off of billet as per RP 11/29/2018 11/29/2018 1.50 PROD2 STK KOST T Stall motor, PUW=46 k, RBIH, stall 10,781.1 10,783.0 18:24 19:54 motor again, PUW=46 k, 1.9 bpm at 4,198 psi, Diff=465 psi, WHP=14, BHP=3,480, IA=759 , OA=89 11/29/2018 11/29/2018 1.00 PROD2 DRILL DRLG T Drill Ahead, 1.9 bpm at 4,206 psi, 10,783.0 10.868.0 19:54 20:54 Diff --755 psi, WHP=15, BHP=3,515, IA=765, OA=102 11/29/2018 11/29/2018 0.30 PROD2 DRILL WPRT T TD build section w/24.68' DLGS off of 10.868.0 10,753.0 20:54 21:12 billet, PUW 48 It, PUH to drift billet area. 11/29/2018 11/29/2018 0.20 PROD2 DRILL WPRT T Perform dry drift past KOP(clean) 10,753.0 10.792.0 21:12 21:24 11/29/2018 11/29/2018 0.30 PROD2 DRILL TRIP T PUH though window, jog inside 7", 10.792.0 10,621.0 21:24 21:42 1 1 1 1 open EDC , PUW 46 k Page 13/27 Report Printed: 12126120181 JdAdehhk operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time our (no Prase Dip Code Activity Cote Time P-T-X operanon (ftKB) End Depth (ftKB) 11/29/2018 11/29/2018 2.20 PROD2 DRILL TRIP T POOH, PUW 43 k (12 k bobble @ 10,621.0 72.2 21:42 23:54 10,579'), jog @ 4,800' and 3,000' 11/29/2018 11/30/2018 0.10 PROD2 DRILL PULD T PJSM, for PUD 72.2 0.0 2354 00:00 11/30/2018 11/30/2018 1.50 PROD2 DRILL PULD T PUD, build BHA #14 72.2 0.0 0000 01:30 11/30/2018 11/30/2018 1.50 PROD2 DRILL SVRG T Inspect pac-off assembly (destroyed), 0.0 0.0 01:30 03:00 1 1 1 PJSM, repair stripper assembly 11/30/2018 11/30/2018 0.75 PROD2 DRILL SVRG T Complete upper brass removed, full of 0.0 0.0 03:00 03:45 debris, clean and prep for re- installation, install brass, PT 3,500 psi (good-test) 11/30/2018 11/30/2018 1.60 PROD2 DRILL PULD T PJSM, PU/PD, Lateral Drilling BHA 0.0 78.2 03:45 05:21 #15 11/30/2018 11/30/2018 2.10 PROD2 DRILL TRIP T RIH, 78.2 10,530.0 05:21 07:27 Shallow test agitator rate bpm diff press psi 1.0 396 1.5 812 1.9 1220 11/30/2018 11/30/2018 0.20 PROD2 DRILL DLOG T Tie into K1 for+11.5' 10,530.0 10,574.0 07:27 07:39 11/30/2018 11/30/2018 0.40 PROD2 DRILL TRIP T Continue to RIH, pumping min rate, 10,574.0 10,864.0 07:39 08:03 start seeing WOB @ 10,844' up to 4.5 k by 10856', PU's 45-46 k at low pump rates, work coil to 10864' S/D with 6.5 k WOB while coming up on the pump to drill. PU 68 k lbs. 11/30/2018 11/30/2018 0.40 PROD2 DRILL TRIP T Reduce rate to min. CT weight 10,864.0 10,763.0 08:03 08:27 returned to normal - 44 k lbs, normal WOB, PUH above billet @ 10780'. Increase rate to 1.9 pm while slowly pulling p hole and pumping a 5x5 4% lube pill to the bit while jogging between the bottom of the window and build. 11/30/2018 11/30/2018 0.60 PROD2 DRILL TRIP T RIH on sweep to 10,865', increase 10,763.0 10,654.0 08:27 09:03 pump rale to 1.8 immediate WOB spike to 5 k lbs. Motor stalled, PU 50 k lbs, -1 k WOB, Increased pump rate while pulling up hole and WOB increased to -4 k lbs, and stalled. Off the pump, WOB returned to -1 k lbs. Attempt to RBIH at lowered pump rale, 1.3 bpm, similar results, high WOB, stall, heavy pick ups. Consult w town engineering. 11/30/2018 11/30/2018 2.00 PROD2 DRILL TRIP T POOH for BHA swap. 10,654.0 81.0 09:03 11:03 11/30/2018 11/30/2018 1.30 PROD2 DRILL PULD T Bump up, space out, unstab, inspect 81.0 0.0 11:03 1221 pack offs - replace, PUD BHA #16. Bit 1/1 11/30/2018 11/30/2018 1.10 PROD2 DRILL PULD T PU 7 PD BHA#17, new coil track, 0.0 62.0 12:21 13:27 less Res tool and agitator. Re ran high bend from the build, re bent to 0.5 ° AKO. Reran above A2 bit. 11/30/2018 11/30/2018 1.90 PROD2 DRILL PULD T RIH 62.0 10,530.0 13:27 15:21 1 1 1 1 1 checked coil @ 2400r- 2.001" x 2.001" 11/30/2018 11/30/2018 0.20 PROD2 DRILL DLOG T Log the Kl for a +4.5' correction 10.530.0 10,571.2 15.21 15:33 1 Page 14/27 Report Printed: 12/2612018 uperations Summary (with Timelog Depths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sten Depth Stan Time End Time Our (hr) Phase Op Corte Activity Code Time P -T -X Operation (fIKB) End Depth (fiKB) 11/30/2018 11/30/2018 0.70 PROD2 DRILL DRLG T CT Pu Wt 47 kl bs, Close EDC. 10,571.2 10,680.0 15:33 16:15 continue to RIH Pass through window - Clean, Run past billet clean - pumping 0.5 bpm RIH S/D @ 10749', stacked 4.5 k, PU, 49 k drug -2.5 k wob PUH above billet clean, captured driling parameters CT 4228 psi, @ 1.89 bpm. 509 psi diff. Pull up hole into 7" while calling town. 11/30/2018 11/30/2018 1.30 PROD2 DRILL DRLG T RBIH, pump to 1.90 bpm @ 10,790' 10,680.0 10,844.0 16:15 17:33 Zero WOB as soon as pressures stabilize, RIH @ 5ft'/min see spikes in WOB with motor work @ 10805.7, 10807.7, 10817.8, and 10821.6' WOB to 4.75 k lbs, PU 53 k, clean RBIH, Similarly stack weight and drill to 10826.6', PU 53 k lbs. Work our way to 10,844' 11/30/2018 11/30/2018 0.75 PROD2 DRILL DRLG T Drill thru tight spot, 1.9 bpm at 4,240 10,844.0 10,869.6 17:33 18:18 psi, Diff -565 psi, WHP=15, BHP=3,369, IA=769, OA=113 11/30/2018 11/30/2018 0.50 PROD2 DRILL DRLG T Lost diff, PUW 48 k, spike in annular 10,869.6 10,640.0 18:18 18:48 pressure, keep pulling up hole into the rasing 11/30/2018 11/30/2018 1.50 PROD2 DRILL WPRT T Perform jog 10,640'-10,685', circulate 10,640.0 10,685.0 18:48 20:18 BU with sweeps, WeIIWORC indicating 1.8 CR, sample is showing bigger cuttings leavings) pictures uploaded to s:drive. 11/30/2018 11/30/2018 0.30 PROD2 DRILL WPRT T Open EDC, PUH PUW 46k 10,685.0 10,535.0 20:18 20:36 11130/2018 11/30/2018 0.20 PROD2 DRILL DLOG T Log Kt marker correction of plus 3.5' 10,535.0 10,554.0 2036 20:48 11/30/2018 11/30/2018 0.30 PROD2 DRILL WPRT T RIH, close EDC 10,554.0 10,700.0 20:48 21:06 11/30/2018 11/30/2018 0.20 PROD2 DRILL WPRT T At 10,720' bring pump up to 0.6 pm, 10,700.0 10,727.0 21:06 21:18 set down @ 10,727', PUW 48 k 11/30/2018 11/30/2018 1.00 PROD2 DRILL DRLG T Drill through tight spot @ 1.9 bpm. 10,727.0 10,800.0 21:18 22:18 pass through tight spot at 3 fph, work down to next tight spot @ 10,771', PUH, RBIH, clean to 10,800' 11/30/2018 11/30/2018 1.50 PROD2 DRILL WPRT T Pump 5x5 sweep, pull up into the 10,800.0 10,650.0 22:18 23:48 cased hole, circulating BU w/5x5 sweep, 11/30/2018 12/1/2018 0.20 PROD2 DRILL TRIP T Open EDC, POOH 10,650.0 8,872.0 23:48 00:00 12/1/2018 12/1/2018 1.50 PROD2 DRILL TRIP T Continue POOH w/open EDC 8,872.0 62.6 00:00 01:30 12/1/2018 12/1/2018 1.50 PROD2 DRILL SVRG T At surface, spaceout 1.2', breakoff 62.6 62.6 01:30 03:00 INJH, inspect pac-off (damaged), pull upper and lower brass confirm P/N's (good), install parts. 12/1/2018 12/1/2018 0.80 PROD2 DRILL PULD T PUD drilling BHA#16 62.6 0.0 03:00 03:48 12/1/2018 12/1/2018 1.50 PROD2 DRILL PULD T PD, OH Anchored Billet 0.0 85.2 03:48 05:18 12/1/2018 12/1/2018 2.00 PROM DRILL TRIP T RIH 85.2 10,530.0 05:18 07:18 12/1/2018 12/1/2018 0.20 PROD2 DRILL TRIP T Tie into K1 for +4' correction 10,530.0 10,668.0 07:18 07:30 Page 15127 ReportPrinted: 1 2/2 612 01 8 operations Summary (with Timelog Lrepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (m) Phase Op Code Activity Code Time P -T -X Operation (flKB) End Depth (W) 12/1/2018 12/1/2018 0.30 PROD2 DRILL WPST T PU Wt 47 k lbs, close EDC, Continue 10,668.0 10,784.3 07:30 07:48 to RIH. Start seeing WOB @ 10,751'„ 5-6 k, ease in hole to 10,784 bit depth. Pull to neutral CT WL pump on, sheared @ 4500 psi, set 2 k WOB. "TOB 10760 bottom 10784.3 12/1/2018 12/1/2018 1.80 PROD2 DRILL TRIP T POOH 10.784.3 75.4 07:48 09:36 12/1/2018 12/1/2018 1.40 PROD2 DRILL PULD T PUD & LD BHA# 17. Billet setting 75.4 0.0 09:36 11:00 assembly. PU BHA#18, short tool ftt entieriy in PDL. 12/1/2018 12/1/2018 0.60 PROD2 DRILL SVRG T Skid cart, inspect pack offs, they were 0.0 0.0 11:00 11:36 shot - replaced, mechanic inspected system and goose neck. No smoking gun found. New pack offs are 1018 vintage, oldeff ones that appeared to be working were 2017 vintage. 1/2 drum was not full of oil on this trip indicating it is going to the well. Did confirm oiler is oiling. 12/1/2018 12/1/2018 0.70 PROD2 DRILL PULD T PD BHA # 18, AL1 -01 KO build / turn 0.0 62.0 11:36 12:18 dilling assemby, 1.7 ° AKO, RR P104 cutters. 12/1/2018 12/1/2018 1.90 PROD2 DRILL TRIP T RIH 62.0 10,525.0 12:18 14:12 12/1/2018 12/1/2018 0.20 PROD2 DRILL DLOG T Tie into K1 for M' correction, 10,525.0 10,549.0 14:12 14:24 12/1/2018 12/1/2018 0.60 PROD2 DRILL TRIP T PU Wt 47k lbs, Close EDC, continue 10,549.0 10,660.0 14:24 15:00 to RIH. WOB at 10,760'0.48 k lbs, increased to 0.81k lbs @ 10765' suspect pushing the billet to bottom. Alert town engineering, PUH, tie into the RA tag for no correction, Pull through window @ 10 fl/hr pumping 0.4 bpm, - 1k WOB tug @ 10,709' while pulling through the window. 12/1/2018 12/1/2018 0.50 PROM DRILL TRIP T Consulted wtown, RBIH, WOB 10,660.0 10,696.0 15:00 15:30 increased from 5 lbs to 800 lbs @ 10765' whe we had left the billet last time, pushed it to 10.768' WOB broke balk to 360 lbs Pulled out of hole, Pull through window @ 10 ft/hr pumping 0.4 bpm. - 636 Ib WOB tug @ 10,709' while pulling through the window. 12/1/2018 12/1/2018 0.90 PROD2 DRILL TRIP T Open EDC, PUH, change of plans, 10,696.0 10,700.0 15:30 16:24 park at 10,700' MD. 5806 TVD Shut choke trapping 3405 psi BHP, EMW 11.28 ppg Watch pressure fall to 3165 psi - 10.48 EMW in 20 minutes 12/1/2018 12/1/2018 3.70 PROD2 DRILL CIRC T Transfer fluids in the pits, build 11.0 10,700.0 10,700.0 16:24 20:06 ppg completion fluid. 12/1/2018 12/1/2018 0.40 PROD2 DRILL CIRC T Send 11.0 ppg down the coil, 10,700.0 10,675.0 20:06 20:30 12/1/2018 12/1/2018 2.00 PROD2 DRILL TRIP T POOH while displacing well to 11.0 10,675.0 72.2 20:30 22:30 ppg completion fuild 12/1/2018 12/1/2018 0.50 PROD2 DRILL PULD T At surface, check well for flow, PJSM 72.2 72.2 22:30 23:00 12/1/2018 12/1/2018 0.50 PROD2 DRILL PULD T LD drilling tools on a dead well 72.2 0.0 23:00 23:30 Page 16127 Report Printed: 1212612018 . perations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Stan Time End Time Dur (hr) Phase Op Code AnWy Coda Time P -T -X Operehon (MB) End Depth (WB) 12/1/2018 12/1/2018 0.25 COMPZ1 CASING PUTB T Prep RF for liner Ops, PJSM, PU 2 0.0 63.2 23:30 23:45 joints of slotted liner and 4.03 pup joint 12/1/2018 12/2/2018 0.25 COMPZ1 CASING PUTB T RD RF from liner Ops 63.2 63.2 23:45 00:00 12/2/2018 12/2/2018 0.50 COMPZ1 CASING PULD T PU/MU CoilTrak tools, perform surface 63.4 107.4 00:00 00:30 test (good -test) 12/2/2018 12/2/2018 0.40 COMPZ1 CASING RUNL T RIH with L1 Liner Segment#3 107.4 1,850.0 00:30 00:54 12/2/2018 12/2/2018 0.40 COMM CASING RUNL T POOH, at surface, check well for flow 1,850.0 103.4 00:54 01:18 12/2/2018 12/2/2018 0.45 COMPZl CASING PULD T Unstab INJH, MU 4.03'solid pup joint 103.4 107.4 01:18 01:45 12/2/2018 12/2/2018 1.80 COMPZ1 CASING RUNL T RI H with Ll Liner Segment#3 107.4 10,580.0 01:45 03:33 12/2/2018 12/2/2018 0.20 COMPZl CASING RUNL T Log the K1 marker correction of 3.5' 10,580.0 10,604.0 03:33 03:45 12/2/2018 12/212018 0.20 COMPZl CASING RUNL T Continue IH 10,604.0 10,768.0 03:45 03:57 12/2/2018 12/2/2018 0.20 COMPZ1 CASING RUNL T Set down wieght 0.5 k DHWOB, bring 10,768.0 10,704.8 03:57 04:09 pump up to 1.7 bpm/1,546 psi Diff, PUW 43 k 12/2/2018 12/2/2018 1.60 COMPZ1 CASING TRIP T PUH, remove liner length from 10,704.8 47.0 04:09 05:45 counters, POOH 12/2/2018 12/2/2018 1.60 COMPZ1 CASING TRIP T Bump up, flow chwck, LD BHA 19 47.0 0.0 05:45 07:21 over a dead well. Losses - 10 bbls per hr. 5-6 bbls fill up might be a balance point. 12/2/2018 12/2/2018 1.20 PROD2 WHDBOP CIRC P Stab back on, jet stack turning coil 0.0 0.0 07:21 08:33 1 1 1 over to water. 12/2/2018 12/2/2018 0.45 PROD2 WHDBOP CTOP P Test and chart inner reel iron , Valve 0.0 0.0 08:33 09:00 crew service tree valves. 12/2/2018 12/2/2018 1.00 PROD2 WHDBOP CTOP P Grease surface valves and BOP stack 0.0 0.0 09:00 10:00 12/2/2018 1212/2018 1.50 PROD2 WHDBOP CTOP P Flood up and attempt to get a shell 0.0 0.0 10:00 11:30 lest. Struggle to get shell test, find leaking bleeder #4, replace, same issues, dumped SSV, blocked in everything, found MM 6 & 2 leaking. Found metal debris in valve, cleanout metal and re -test, (good -shell test) Note some double blocked valves behind MM2& 6 have to be leaking too. 12/2/2018 12/2/2018 11.50 PROD2 WHDBOP BOPE P Start BOPE test, 4 fail passes C7, B7, 0.0 0.0 11:30 23:00 B3 and R2. test witnessed by AOGCC Matt Herrera. (250/3500/2500) 12/2/2018 12/2/2018 0.50 PROD2 WHDBOP CTOP P RD testing equipment 0.0 0.0 2300 23:30 12/2/2018 12/3/2018 0.50 PROD2 RPEQPT CTOP T Slide cart forward, trim 15' of coiled 0.0 0.0 23:30 00:00 tubing, prep for CTC 12/3/2018 12/3/2018 2.00 PROD2 RPEQPT CTOP T Dress coil for CTC, install and pull test 0.0 0.0 00:00 02:00 35 k 12/3/2018 12/3/2018 0.45 PROD2 RPEQPT CTOP T PJSM, head up a -line, PT 4,000 psi 0.0 0.0 0200 02:27 (good -test) 12/3/2018 12/3/2018 0.20 PROD2 RPEQPT CTOP T Pump open SSV, install fuseable cap 0.0 0.0 02:27 02:39 (left hand thread), confirm hgih side on HEW 12/3/2018 1213/2018 1.10 PROD2 RPEQPT CTOP T Test return line (removed for BOP test 0.0 0.0 02:39 03:45 trouble shooting)Slide cart forward stab onto INJH, fill the hole Page 17/27 Report Printed: 12126/2018 operations Summary (with Timelog Depths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (m) Phase Op Code Activity Code Time P -T -X Operation (WB) End DepN(fiKa) 12/3/2018 12/3/2018 1.00 PROD2 RPEQPT PULD T PSJM, PU/MU CoilTrak tools PU/MU 0.0 73.5 03:45 04:45 NS HEW, stab onto tools, perform surface test (good -test) 12/3/2018 12/3/2018 2.20 PROD2 RPEQPT TRIP T Check pac-off (good -rerun), tag up, 73.5 10,535.0 04:45 06:57 reset counters, RIH 12/3/2018 12/3/2018 0.20 PROD2 RPEQPT DLOG T Tie nto the K1 for a + 4.5' correction. 10.535.0 10,562.2 06:57 07:09 12/3/2018 12/3/2018 0.30 PROD2 RPEQPT WPST T RIH to 10688.8 dean, PU Wt 47k Itis 10.562.2 10,688.8 07:09 07:27 RBIH to bit depth 10688.8, close EDC, PU to neutral weight - 42 k lbs. HS, pump on, WOB 0.19 k Ib, Saw 2200 psi o nhe CT and 1700 psi diff. SD 5.2 k lbs, WS set. TOWS 10,680.02' 12/3/2018 12/3/2018 2.20 PROD2 RPEQPT TRIP T PU Wt 45 k lbs, Open EDC, reset 10,688.8 T6-0- 07:27 09:39 depths, POOH 12/3/2018 12/3/2018 1.00 PROD2 RPEQPT PULD T Bump up, flow check, Well on a vac, 76.0 0.0 09:39 10:39 losses the same, - 8-10 bbis/hr. LD BHA #20 over a dead well. Inspect pack offs. Perfect - re -ran. 12/3/2018 12/3/2018 1.40 PROD2 WHPST PULD T W/O Motor, late call out. PU motor, 0.0 76.0 10:39 12:03 milling pup, (verified motor 1°), MU BHA, skid cat, stab on, bump up, reset counters. 12/3/2018 12/3/2018 2.00 PROD2 WHPST TRIP T RIH swapping coil over to milling fluid, 76.0 10,550.0 12:03 14:03 SID @ 10,054', 6 k WOB, 54 k lbs PU, close EDC, pump 1/2 bpm, running 70 ft/min. no issues. 12/3/2018 12/3/2018 0.20 PROD2 WHPST TRIP T Tie into Kt marker for +65 correction. 10,550.0 10,575.0 14:03 14:15 12/3/2018 12/3/2018 1.80 PROD2 WHPST DISP T Open EDC, turn well over to milling 10,575.0 10,685.3 14:15 16:03 fluid, close the EDC. RIH and dry pinch point of HEW @ 10685.28'. SID 1.4 k lbs WOB. PU Wt 48 Is lbs. 12/3/2018 12/3/2018 0.20 PROD2 WHPST CIRC T PUH, Set rate, CT 4132 psi @ 1.90 10.685.3 10,684.8 16:03 16:15 bpm in and 1.55 bpm out, Free spin 630 psi, WH 13 psi, IA 749 psi, OA 81 psi, Annular 3424 psi, 11.38 ppg EMW, CT Wt 14.8 k lbs, 12/3/2018 12/3/2018 3.30 PROD2 WHPST MILL T See motor work and WOB (off 10684.8' 10,684.8 10,669.5 16:15 19:33 10686.12' - have metal at the shaker 10688' - Exit the casing - bottom of the window. 12/3/2018 12/3/2018 1.00 PROD2 WHPST MILL T Drill ahead Q 10689'to 10,705'TD 10,689.51 10,705.0 19:33 20:33 Formation in the sample 12/3/2018 12/3/2018 3.30 PROD2 WHPST REAM T Ream window area 30 L, 30 R, HS. 10,705.0 10,682.0 20:33 23:51 clean, dry drift window exit (clean) 12/3/2018 12/4/2018 0.16 PROD2 WHPST WPRT T Dry Drift window exit (clean) 10,682.0 10,705.0 23:51 00:00 12/4/2018 12/4/2018 0.50 PROD2 WHPST CIRC T Circulate sweep down coil 10,705.0 10,670.0 00:00 00:30 12/4/2018 12/4/2018 1.80 PROD2 WHPST TRIP T POOH, chasing sweep to surface 10,670.0 77.0 00:30 02:18 12/4/2018 12/4/2018 1.30 PROD2 WHPST PULD T At surface, space out, PUD milling 77.0 0.0 02:18 03:36 assembly 12/4/2018 12/4/2018 1.20 PROD2 DRILL PULD T PD Build Section BHA # 22, PU 0.0 72.2 03:36 04:48 CoilTrak tools, perform surface test (good -test) 12/4/2018 12/4/2018 2.00 PRO52 DRILL TRIP T Open Rams, tag up, reset counters, 72.2 10,530.0 04:48 06:48 RIH Page 18/27 Report Printed: 12126/2018 operations Summary (with Timelog Lrepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Time End Time Dur (h) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKa) 12/4/2018 12/4/2018 0.20 PROD2 DRILL CLOG T Log the K1 marker correction of minus 10,530.0 10,558.0 06:48 07:00 3.5', PUW 46 k 12/4/2018 12/4/2018 0.40 PROD2 DRILL TRIP T Continue IH, close EDC, set down at 10,558.0 10,683.0 07:00 07:24 10,683', 10,682', and 10,661'. 12/4/2018 12/4/2018 0.20 PROD2 DRILL TRIP T PUH 10,683.0 10,530.0 07:24 07:36 12/4/2018 12/4/2018 0.20 PROD2 DRILL DLOG T Log the K1 marker, missed marker. 10,530.0 10,500.0 07:36 07:48 1 1 1 PUH PUW 46 k 12/4/2018 12/4/2018 0.20 PROD2 DRILL DLOG T Log the Kt marker correction of plus 10,500.0 10.558.0 07:48 08:00 26.0' 12/4/2018 12/4/2018 0.25 PROD2 DRILL TRIP T Continue IH through window 10,558.0 10705.0 08:00 08:15 12/4/2018 12/4/2018 1.75 PROD2 DRILL DRLG T OBD, 1.9 bpm at 4,120 psi, Diff=468, 10,705.0 10,920.0 08:15 10:00 BHP=3,521, WHP=220, IA=768, OA=122 12/4/2018 12/4/2018 0.20 PROD2 DRILL WPRT T TO Build Section, PUH PUW 46 k 10.920.0 10,650.0 10:00 10:12 12/4/2018 12/4/2018 0.50 PROD2 DRILL WPRT T Jog the 7' Clean, Open EDC 10,650.0 10,654.0 10:12 10:42 12/4/2018 12/4/2018 2.00 PROD2 DRILL TRIP T POOH, performing 500'jog @ 2,200' 10,654.0 72.2 10:42 12:42 12/4/2018 12/4/2018 0.90 PROD2 DRILL PULD T PJSM, PUD build assembly with high 72.2 0.0 12:42 13:36 bend motor 12/4/2018 12/4/2018 1.30 PROD2 DRILL PULD T PD Lateral Drilling Assembly #23 0.0 78.2 13:36 14:54 12/4/2018 12/4/2018 2.00 PROD2 DRILL TRIP T Stab INJH, test CoilTrak tools (good- 78.2 10,530.0 14:54 16:54 test), tag up reset counters, RIH. surface test agitator @ 473' 12/4/2018 12/4/2018 0.20 PROD2 DRILL DLOG T Log the K1 marker correction of minus 10,530.0 10,563.0 16:54 17:06 5.5', PUW 44 k 12/4/2018 12/4/2018 0.10 PROD2 DRILL TRIP T Continue IH w/closed EDC 10,563.0 10,920.0 17:06 17:12 12/4/2018 12/4/2018 3.10 PROD2 DRILL DRLG T OBD, 1.9 bpm at 4640SI FS, 10,920.0 11,321.0 17:12 20:18 BHP=3519, New mud @ bit 10,933' 12/4/2018 12/4/2018 0.30 PROD2 DRILL WPRT P Pull wiper to bottom of build, 400' 11,321.0 11,321.0 20:18 20:36 wiper #I, PUW=52K 12/4/2018 12/4/2018 1.10 PROD2 DRILL DRLG P 11321', Drill, 1.9 BPM @ 4697 PSi FS, 11,321.0 11.485.0 20:36 21:42 BHP=3572 12/4/2018 12/4/2018 0.10 PROD2 DRILL WPRT P Pull 100' BHA wiper, PUW=55K 11,485.0 11,485.0 21:42 21:48 12/4/2018 12/4/2018 2.00 PROD2 DRILL DRLG P 11485', Drill, 1.9 BPM @ 4697 PSI FS, 11,485.0 11,720.0 21:48 23:48 BHP=3572 12/4/2018 12/5/2018 0.20 PROD2 DRILL WPRT P 11720. Wiper to bottom of build, 11,720.0 11,323.0 23:48 00:00 PUW=56K 12/5/2018 12/5/2018 0.40 PROD2 DRILL WPRT P Continue wiper to bottom of build, 11,323.0 11,718.0 00:00 00:24 Clean trip up and down 12/5/2018 12/5/2018 1.30 PROD2 DRILL DRLG P 11,718', Drill 1.9 BPM @ 4745 PSI FS, 11,718.0 11,842.0 00:24 01:42 BHP=3670 12/5/2018 12/5/2018 0.20 PROD2 DRILL WPRT P 11842 Pull 100' BHA wiper, PUW=55K 11,842.0 11,842.0 01:42 01:54 12/5/2018 12/5/2018 1.30 PROD2 DRILL DRLG P 11.842 Drill, 1.9 BPM @ 4840 PSI FS, 11,842.0 11.945.0 01:54 03:12 BHP=3623, Loosing surface weight. 12/5/2018 12/5/2018 0.10 PROD2 DRILL WPRT P 11945, Low ROP and srface weight, 11,945.0 11,945.0 03:12 03:18 Pull 1 00'wiper for low surface weight. Pump sweeps 12/5/2018 12/5/2018 0.30 PROD2 DRILL DRLG P 11945', Drill, 1.89 BPM @ 4760 PSI 11,945.0 11,965.0 03:18 0336 FS, BHP=3660, RIW=-5K. DHWOB=1 K 12/5/20111 12/5/2018 1.00 PROD2 DRILL WPRT P 11,965', Sweeps coming out. Pull 11,965.0 10,675.0 03:36 0436 I wiper to window, Jet 7 inch to tubing tail Page 19127 ReportPrinted: 12/26/2018 operations Summary (with Timelog bepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depin Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (flK6) End Depth(ftKB) 12/5/2018 12/5/2018 0.30 PROD2 DRILL WPRT P Jet the 7" to the tubing tail 10,675.0 10,625.0 04:36 04:54 12/5/2018 12/5/2018 0.15 PROD2 DRILL WPRT P RIH 10,625.0 10,700.0 04:54 05:03 12/5/2018 12/5/2018 0.15 PROD2 DRILL DLOG P Log the RA marker correction of plus 10,700.0 10,723.0 0503 05:12 4.5' 12/5/2018 12/5/2018 0.40 PROD2 DRILL WPRT P RBIH 10,723.0 11,965.0 05:12 05:36 12/5/2018 12/5/2018 0.50 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,925 psi. Diff=425 11,965.0 12,006.0 05:36 06:06 psi, WHP=50, BHP=3,750, IA=776, OA=155 12/5/2018 12/5/2018 0.20 PROD2 DRILL WPRT P 200' wiper up hole, PUW 50 k 12,006.0 12,006.0 06:06 06:18 12/5/2018 12/5/2018 0.20 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,810 psi, Diff -733 12,006.0 12,008.0 06:18 06:30 psi, WHP=50, BHP=3,750, IA=776, OA=155 12/5/2018 1215/2018 0.45 PROD2 DRILL WPRT P 500', Wiper up hole, PUW 55 k 12,008.0 12,008.0 06:30 06:57 12/5/2018 12/5/2018 1.00 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,810 psi, DiR=730 12,008.0 12.047.0 06:57 07:57 psi, WHP=50, BHP=3,750, IA=776, OA=155 12/5/2018 12/5/2018 0.15 PROM DRILL WPRT P 200'. Wiper up hole, PUW 57 k 12,047.0 12,047.0 07:57 08:06 12/5/2018 12/5/2018 3.80 PROM DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Dith-730 12.047.0 12,292.0 08:06 11:54 psi, WHP=50, BHP=3,750, IA=776, OA=155 12/5/2018 12/5/2018 0.50 PROD2 DRILL WPRT P Wiper up to the window PUW 56 k 12,292.0 10,630.0 11:54 12:24 12/5/2018 12/5/2018 0.45 PROD2 DRILL WPRT P Jog the 7" clean w/sweeps, circulate 10,630.0 10,530.0 12:24 12:51 BU, Open EDC, PUH to logging depth 12/5/2018 12/5/2018 0.20 PROD2 DRILL DLOG P Log the K1 correction of plus 4.0' 10,530.0 10,563.0 12:51 13:03 12/5/2018 12/5/2018 0.20 PROD2 DRILL WPRT P Continue IH, Gose EDC 10,563.0 10,650.0 13:03 13:15 12/5/2018 12/5/2018 0.75 PROD2 DRILL WPRT P Continue wiper back in hole, RM 11 k 10,650.0 12,292.0 13:15 14:00 12/5/2018 12/5/2018 2.75 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, 12,292.0 12,457.0 14:00 16:45 Diff=1,103 psi, WHP=17, BHP=3,771, IA=778, OA=158 12/5/2018 12/5/2018 3.35 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, 12,457.0 12,539.0 16:45 20:06 Diff=1,220 psi, WHP=17, BHP=3,771, IA=778, OA=158 12/5/2018 12/5/2018 0.10 PROD2 DRILL WPRT P BHA Wiper, PUW=62K. Low surface 12,539.0 12,537.0 20:06 20:12 weight, Low ROP. Pump remaining screen clean from pill pit #1. No obvious inprovement 12/5/2018 12/5/2018 1.10 PROD2 DRILL DRLG P 12537', Drill 1.87 BPM @ 5360 PSI 12,537.0 12,560.0 20:12 21:18 FS, BHP=3800 12/5/2018 12/5/2018 0.10 PROD2 DRILL WPRT P 12560, Stacking, 100' BHA wiper, 12,560.0 12,559.0 21:18 21:24 1 1 IPUW=65K 12/5/2018 12/5/2018 2.00 PROM DRILL DRLG P 12559', Drill. 1.86 BPM @ 5260 PSI 12,559.0 12,631.0 21:24 23:24 FS, BHP=3817, RIW=-3K, DHWOB=1.6, Prep for mud swap 12/5/2018 12/5/2018 0.10 PROM DRILL WPRT P 12631', BHA wiper, PUW=59K 12,631.0 12,631.0 23:24 23:30 12/5/2018 12/6/2018 0.50 PROD2 DRILL DRLG P 12631', Drill, new mud at bit @ 12,631.0 12,651.0 23:30 00:00 12,640'. 1.86 BPM @ 5070 PSI FS, BHP=3790 12/6/2018 12/6/2018 1.60 PROD2 DRILL DRLG P Drilling, 1.88 BPM @ 4775 PSI FS. 12,651.0 12,692.0 D0:00 01:361 1 BHP -3685, RIW -4.51K Page 20/27 ReportPrinted: 1 212 612 01 8 operations Summary (with Timelog Depths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log scan Dapdh Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (flKa) 12/6/2018 12/6/2018 2.10 PROD2 DRILL WPRT P Pull wiper to end of build @ 10,920'. 12,692.0 12,692.0 01:36 03:42 Clean trip up. Stacked out @ 11,931 PUH. Stack out @ 11919. PUH and work pipe. Went through @ 1 BPM. Run down to 11,950. Bring pumps on @ 1.7 and back ream up to 11990. RBIH had to reduce rate to get through. Continue to bottom. Stack @ 11,969. PUH and work through. Geo calls this transition area between A2 andA3 lower silt. Below 12,100 back in A3 pay area bring rate up to 1.6 BPM. Stack out @ 12584. Pick up and work through 12/6/2018 12/6/2018 3.40 PROD2 DRILL DRLG P Get to bottom, Drill, 1.88 BPM @ 4775 12,692.0 12,742.0 03:42 07:06 PSI FS, BHP=3603, RIW=-5K, DHWOB=.92, ROP=20 FPH 12/6/2018 12/6/2018 0.15 PROD2 DRILL WPRT P BHA wiper up hole PUW 58 k 12,742.0 12,742.0 07:06 0715 12/6/2018 12/6/2018 3.75 PROD2 DRILL DRLG P BOBD, 1.85 bpm at 4843 psi, 12,742.0 12,832.0 07:15 11:00 Diff -1,134, WHP=50, BHP=3,791, IA=787, OA=211 12/6/2018 12/6/2018 1.35 PROM DRILL WPRT P BHA wiper up hole PUW 62 k, pump 12.832.0 12,832.0 11:00 12:21 1 115 bbl screen clean and drillzone. 12/6/2018 12/6/2018 0.45 PROD2 DRILL DRLG P BOBD. 1.85 bpm at 4843 psi, 12,832.0 12,885.0 12:21 12:48 Diff=1,134, WHP=50, BHP=3,791, IA=787, OA=211 12/6/2018 12/6/2018 0.15 PROD2 DRILL WPRT P BHA wiper up hole PUW 61 k 12,885.0 12,885.0 12:48 12:57 12/6/2018 12/6/2018 0.50 PROD2 DRILL DRLG P BOBD, 1.85 bpm at 4843 psi, 12,885.0 12,902.0 12:57 13:27 Diff -1,134, WHP=50, BHP=3,791, IA=787, OA=211 12/6/2018 12/6/2018 2.75 PROD2 DRILL DRLG P BOBD, 1.85 bpm at 4843 psi, 12,902.0 13,050.0 13:27 16:12 Diff --1,134, WHP=50, BHP=3,791, IA=787. OA=211, pump 40 bbl (1 ppb alpine beads and 2% 776, and 2% Lo- torq) 12/6/2018 12/6/2018 1.70 PROD2 DRILL WPRT P Wiper up to the casing PUW 51 K, Jet 13,050.0 10,530.0 16:12 17:54 7" tibing to TT, PUH to K1 marker 12/6/2018 12/6/2018 0.20 PROD2 DRILL DLOG P Log K1 marker for+10', close EDC 10,530.0 10,565.0 17:54 18:06 12/6/2018 12/6/2018 1.20 PROD2 DRILL WPRT P Continue wiper trip back in hole. Set 10,565.0 13,056.0 18:06 19:18 down @ 11,978 and work through with reduced pump rate 12/6/2018 12/6/2018 3.70 PROD2 DRILL DRLG P 13056', Drill, 1.9 BPM @ 5280 PSI 13,056.0 13,130.0 19:18 23:00 FS, BHP=3905, RIW=-6K, DHWOB= 1.2K. Low ROP - 20 FPH. Pump 20 BBI beaded lube pill. No improvement. 12/6/2018 1216/2018 0.30 PROD2 DRILL WPRT P BHA Wiper, PUW=62K 13,130.0 13,130.0 23:00 23:18 12/6/2018 12/7/2018 0.70 PROD2 DRILL DRLG P 13130', Drill, 1.89 BPM @ 5310 PSI 13,130.0 13,141.0 23:18 00:00 FS, BHP=3880 12/7/2018 12/7/2018 0.10 PROD2 DRILL DRLG P 13141', drill, 1.88 BPM @ 5310 PSI 13.141.0 13,143.0 00:00 00:06 FS, BHP=3880 12/7/2018 12/7/2018 0.10 PROD2 DRILL WPRT P BHA short wiper, PUW=57K 13,143.0 13,143.0 00:06 00:12 12/7/2018 12/7/2018 1.30 PROM DRILL DRLG P 13143', Drill, 1.88 BPM @ 5310 PSI 13,143.0 13,178.0 00:12 01:30 FS, BHP=3910, RIW=-5.4K, DHWOB=1.2 12/712018 12/7/2018 2.50 PROD2 DRILL DRLG P 13178, Drilling, lube pill at bit, 1.88 13.178.0 13,234.0 01:30 04:00 1 I BPM @ 5310PSI FS, BHP=5310, Frequent pick ups for weight transfer Page 21127 Report Printed: 1212612018 operations Summary (with Timelog vepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log startDepth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (W13) End Depth (ftK8) 1217/2018 12/7/2018 0.85 PROD2 DRILL DRLG P 13234, Lube pill at bit. recip 100' 13,234.0 13,241.0 04:00 04:51 before lube reached bottom, PUW=57K 1.88 BPM @ 5310 PSI FS, BHP=3919 12/7/2018 12/7/2018 0.20 PROD2 DRILL WPRT P 200' wiper up hole, PUW 55 k 13,241.0 13,241.0 04:51 05:03 1277/2018 12/7/2018 1.75 PROD2 DRILL DRLG P BOBD, 1.88 bpm at 5,310 psi, 13,241.0 13,277.0 05:03 06:48 Diff --150 psi, WHP=138, BHP=3,943, IA=787, OA=250 12/7/2018 12/7/2018 0.15 PROD2 DRILL WPRT P BHA wiper up hole, PUW 62 k 13,277.0 13,277.0 06:48 06:57 12/7/2018 12/7/2018 0.55 PROD2 DRILL DRLG P BOBD, 1.88 bpm at 5,310 psi, 13,277.0 13,285.0 06:57 07:30 Diff --150 psi, WHP=138, BHP=3,943, IA=787, OA=250 12/7/2018 12/7/2018 1.00 PROD2 DRILL WPRT P Wiper to the window w/sweeps. PUW 13,285.0 10.657.0 07:30 08:30 59 k "' Note: Noticed some higher pulling weight thru EOB 12/7/2018 12/7/2018 0.50 PROD2 DRILL WPRT P Jet the 7" clean w/sweeps, function 10,657.0 10,657.0 08:30 09:00 open EDC 12/7/2018 12/7/2018 2.00 PROD2 DRILL TRIP P POOH, pumping 2.0 bpm @ 4,510 psi, 10,657.0 78.3 09:00 11:00 performing 500' jog from 1,500' 12/7/2018 12/7/2018 1.25 PROD2 DRILL PULD P Al surface, spaoeout, PUD drilling 78.3 0.0 11:00 12:15 BHA#23 12/7/2018 12/7/2018 0.50 PROD2 DRILL PULD P Inspect BHA, check motor and agitator 0.0 0.0 12:15 1245 (good) 12/7/2018 12/7/2018 1.75 PROD2 DRILL PULD P PJSM, PD drilling BHA #24 0.0 78.3 12:45 14:30 12/7/2018 12/7/2018 0.25 PROD2 DRILL PULD P Stab upper quick sub, surface test 78.3 78.3 14:30 14:45 Coiltrak tools (good -test) 12!7/2018 12/7/2018 2.00 PROD2 DRILL TRIP P RIH, w/lateral drilling BHA #24 78.3 10,540.0 14:45 16:45 surface test agitator (good -test) 1277/2018 12/7/2018 0.20 PROD2 DRILL DLOG P Log the K1 marker correction of minus 10,540.0 10,568.0 16:45 1657 5.0', PUW 50 k 121'7/2018 12/7/2018 2.05 PROD2 DRILL TRIP P Continue IH, stacking out at 10,690'. 10,568.0 13,285.0 16:57 19:00 PUH, roll pump attempt to pass thru window. Make it through window on third pump cycle. Continue in hole, Stack out multiple depths 11,903, 12266,12,600 12/7/2018 12/7/2018 1.00 PROD2 DRILL DRLG P 13285', Drill, 1.88 BPM @ 5340 PSI 13,285.0 13,307.0 19:00 20:00 FS, BHP=3990, RIW=-7K, DHWOB=.8K. Low ROP, Poor weight transfer. Frequent pickups 12/7/2018 12/7/2018 0.40 PROD2 DRILL WPRT P 200' wiper, unable to get back to 13,307.0 13,307.0 20:00 20:24 bottom after pick up 12/7/2018 12/8/2018 3.60 PROD2 DRILL DRLG P 13307 OBD, 1.87 BPM @ 5395 PSI 13,307.0 13,348.0 20:24 00:00 FS, BHP=4030, Not making hole, work pipe, Pump Lubed sweeps, At bit @ 13324. Little if any improvement in drilling parameters. Frequent pick ups. Low ROP 12/8/2018 12/8/2018 2.10 PROD2 DRILL DRLG P 13348', Drill, 1.87 BPM @ 5300 PSI 13,348.0 13,390.0 00:00 02:06 FS, BHP=3950 12/8/2018 12/8/2018 0.70 PROD2 DRILL WPRT P 13390, BHAwiper, PUW=66K. Have 13,390.0 13,390.0 02:06 02:48 to work pipe back to bottom 12/8/2018 12/8/2018 0.70 PROD2 DRILL DRLG P 13390', drill, 1.87 BPM @ 5300 PSI 13,390.0 13,404.0 02:48 03:30 FS, BHP=3950, RIW=-.8K, DHWOB=I.3K. ROP= -20 FPH 12/8/2018 12/8/2018 0.20 PROD2 DRILL WPRT P BHA Wiper, PUW=64K, Work pipe to 13,404.0 13,404.0 03:30 03:42 bottom Page 22127 Report Printed: 12126120181 i.perations Summary (with Timelog L epths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stall Depth Stan Time End Time our (hp Phase Op Code Activity Code Time P -T -X Operation (MB) End Date, (fiKB) 12/8/2018 12/8/2018 3.00 PROD2 DRILL DRLG P 13404', Drill, 1.88 BPM @ 5350 PSI, 13,404.0 13,437.0 03:42 06:42 BHP=3960. At13417 send 20 BBI lube pill with Screen clean in it (no beads). Little to no change in drilling parameters. 12/8/2018 12/8/2018 0.60 PROD2 DRILL WPRT P Short wiper, PUW 62 k 13,437.0 13.437.0 06:42 07:18 12/8/2018 12/8/2018 1.75 PROD2 DRILL DRLG P BOBO, 1.87 bpm at 5,358 psi, 13 437.0 13,457.0 07:18 09:03 Diff --1,181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 0.20 PROD2 DRILL WPRT P BHA wiper, PUW 67 k, lower pump 13,457.0 13,457.0 09:03 09:15 rate to 1.0 bpm to RBIH 12/8/2018 12/8/2018 0.75 PROD2 DRILL DRLG P BOBO, 1.87 bpm at 5,358 psi, 13,457.0 13,483.0 09:15 10:00 Diff --1,181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 0.15 PROD2 DRILL WPRT P BHA wiper, PUW 69 k, lower pump 13,483.0 13,483.0 10:00 10:09 rale to 1.0 bpm to RBIH 12/8/2018 12/8/2018 1.20 PROD2 DRILL DRLG P BOBO. 1.87 bpm at 5,358 psi, 13,483.0 13,505.0 10:09 11:21 Diff -1.181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 0.15 PROD2 DRILL WPRT P BHA wiper, PUW 72 k, lower pump 13,505.0 13.505.0 11:21 11:30 rale to 1.0 bpm to RBIH 12/8/2018 12/8/2018 1.20 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 5,358 psi, 13,505.0 13.535.0 11:30 12:42 Diff=1,181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 0.15 PROD2 DRILL WPRT P BHA wiper. PUW 69 k, lower pump 13,535.0 13,535.0 12:42 12:51 rale to 1.0 bpm to RBIH 12/8/2018 12/8/2018 3.00 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 5,358 psi, 13,535.0 13.625.0 12:51 15:51 Diff --1,181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 0.15 PROD2 DRILL WPRT P Short BHA wiper up hole, PUW 63 k 13,625.0 13,625.0 15:51 16:00 12/8/2018 12/8/2018 0.75 PROD2 DRILL DRLG P BOBO, 1.87 bpm at 5,358 psi, 13,625.0 13,641.0 16:00 16:45 Diff --1,181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 1.60 PROD2 DRILL DRLG P OBD, 1.87 bpm at 5,358 psi, 13,641.0 13,685.0 16:45 18:21 Diff -1,181 psi, WHP=7, BHP=3,838, IA=791, OA=214 12/8/2018 12/8/2018 1.00 PROD2 DRILL WPRT P Wiper trip, 800', PUW=56K, Smooth 13,685.0 13,685.0 18:21 19:21 1 1 1 trip up and down 12/8/2018 12/8/2018 1.20 PROD2 DRILL DRLG P 13685', Drill, 1.9BPM @ 4890 PSI FS, 13,685.0 13,735.0 19:21 20:33 BHP=3895, RIW -6K, DWOB=I.6K 12/8/2018 12/8/2018 0.20 PROD2 DRILL WPRT P Pull BHA wiper, get survey, PUW=56K 13,735.0 13,735.0 20:33 20:45 12/8/2018 12/8/2018 2.80 PROD2 DRILL DRLG P 13735', Drill, 1.89 BPM @ 5020 PSI 13,735.0 13,807.0 20:45 23:33 FS, BHP=3825, @ 13728 lower rate for heavy vibration, 1.8 BPM @ 4950 PSI FS, BHP=3820 PSI 12/8/2018 12/9/2018 0.45 PROD2 DRILL DRLG P 13807 drilling. Fluid returns drop off to 13,807.0 13,712.0 23:33 00:00 less then .9 BPM, BHP=4850. Notify town eng. 12/9/2018 12/9/2018 2.00 PROD2 DRILL WPRT P Experiencing fluid losses. Pull wiper to 13,712.0 10,525.0 00:00 02:00 window with 7" cleanout in preperation for possible choke shut in,PUW=59K. Oerpull with slight pack off @ 11960. Slight overpull in window, -1.47 k DHWOB 12/9/2018 12/9/2018 0.10 PROD2 DRILL DLOG P Log K1 correction plus 9.0' 10,525.0 10,563.0 02:00 02:06 12/9/2018 12/9/2018 2.00 PROD2 DRILL WPRT P Continue wiper trip to bottom. Set 10,563.0 13,815.0 02:06 04:06 down window, 10680 twice. Roll pump and pass through clean. Good trip to bottom Page 23127 Report Printed: 1 212 612 01 8 operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start Time End Time Our (hr) Phase Op Cod. Activity Code Time P -T -X Operation (MS) End Depth (fiKB) 12/9/2018 12/9/2018 1.80 PROD2 DRILL DRLG P 10,815', Drill 1.66 BPM @ 4840 PSI, 13,815.0 13,876.0 04:06 05:54 BHP=3720, Returns @ 1.39 BPM, RIW-81K, DHWOB=I.4K 12/9/2018 12/9/2018 0.30 PROD2 DRILL WPRT P BHA wiper up hole, PUW 56 k 13,876.0 13,876.0 05:54 06:12 Note: Return rate 0.9 bpm, close choke 12/9/2018 12/9/2018 1.15 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,948 psi, 13,876.0 13,925.0 0612 07:21 Diff=187 psi,WHP=408, BHP=3,339, IA=762, 0A=1 25 12/9/2018 12/9/2018 0.15 PROD2 DRILL WPRT P PU, PUW 58 k 13,925.0 13,925.0 07:21 07:30 12/9/2018 12/9/2018 2.50 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,948 psi, 13,925.0 14,035.0 07:30 10:00 Diff=187 psi,WHP=408, BHP=3,339, IA=762, OA=125 12/9/2018 12/9/2018 0.15 PROD2 DRILL WPRT P PU, PUW 58 k 14,035.0 14,035.0 10:00 10:09 12/9/2018 12/9/2018 2.80 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,948 psi, 14,035.0 14,094.0 10:09 12:57 Diff=187 psi,WHP=408, BHP=3,339, IA=762, 0A=1 25 12/9/2018 12/9/2018 0.15 PROD2 DRILL WPRT P PU, ,PUW 51 k 14,094.0 14,094.0 12:57 13:06 12/9/2018 12/9/2018 1.60 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,948 psi, 14,094.0 14,166.0 13:06 14:42 Diff=187 psi,WHP=408, BHP=3,339, IA=762, OA=125 ****Note: High API 150+@ 14,144- 14,155' 12/9/2018 12/9/2018 0.20 PROD2 DRILL WPRT P PU, ,PUW 53 k 14,166.0 14,166.0 14:42 14:54 12/9/2018 12/9/2018 1.00 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,948 psi, 14,166.0 14,187.0 14:54 15:54 Diff=187 psi,WHP=408, BHP=3,339, IA=762, OA=125 "' Note: Duo -Vis at the bit 14,164' 12/9/2018 12/9/2018 0.30 PROD2 DRILL WPRT P 800' wiper up hole PUW 56 k 14,187.0 13,387.0 15:54 16:12 12/9/2018 12/9/2018 0.60 PROD2 DRILL WPRT P Wiper back in hole 13,387.0 14,187.0 16:12 16:48 12/9/2018 12/9/2018 1.70 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,948 psi, 14,187.0 14,263.0 16:48 18:30 Diff=187 psi,WHP=408, BHP=3,339, IA=753, OA=101 12/9/2018 12/9/2018 0.20 PROD2 DRILL WPRT P BHA Wiper, PUW=56K, BHP=3325 14,263.0 14,263.0 18:30 18:42 12/9/2018 12/9/2018 3.90 PROD2 DRILL DRLG P 14263',Drill, 1.89 BPM @ 4260 PSI 14,263.0 14,352.0 18:42 2236 FS, RIW=-8K, DHWOB=l.1K 12/9/2018 12/9/2018 0.50 PROD2 DRILL WPRT T Lost comms with tool, Pull wiper trip to 14,352.0 14,352.0 22:36 23:06 trouble shoot. Restart surface gear. All good 12/9/2018 12/9/2018 0.70 PROD2 DRILL DRLG P 14352', Drill, 1.89 BPM @ 4260 PSI 14,352.0 14,370.0 23:06 23:48 FS, BHP=3375, 12/9/2018 12/102018 0.20 PROD2 DRILL WPRT P Pull BHA Wiper, PUW=56K 14,370.0 14,371.0 23:48 00:00 12/10/2018 12/10/2018 0.10 PROD2 DRILL WPRT P 14,371.0 14,388.0 00:00 00:06 12/10/2018 12/10/2018 3.20 PROD2 DRILL DRLG P 14388', Drill, 1.89 BPM @ 4300 PSI 14,388.0 14,473.0 00:06 03:18 FS, BHP=3300. RIW=-9K, DHWOS=1.9K, Choke shut 12/10/2018 12/10/2018 0.20 PROD2 DRILL WPRT P 14473, BHAwiper/Shoot surveys. 14,473.0 14,473.0 03:18 03:30 PUW=56K 12/10/2018 12/10/2018 0.30 PROD2 DRILL DRLG P 14473, Drill, 1.9 BPM @ 4300 PSI FS, 14,473.0 14,481.0 03:30 03:48 I BHP=3315 Page 24127 ReportPrinted: 1212612018 Operations Summary (with Timelog Depths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stall Time End Time our (hr) Phase Op Code Activit' Code Time P -T -X Operation (WEI) Eno Depth (ftKe) 12/10/2018 12/10/2018 0.90 PROD2 DRILL WPRT T 14481, Computer issues. Pull off 14,481.0 14,481.0 03:48 04:42 bottom and reboot, PUW=58K 12/10/2018 12/10/2018 3.65 PROD2 DRILL DRLG P Computers up and running, 14,481', 14,481.0 14,585.0 04:42 08:21 drill, 1.88 BPM @ 4294 PSI FS, BHP=3242 12/10/2018 12/10/2018 2.00 PROD2 DRILL WPRT P 800', wiper up hole, PUW 65 k, 14,585.0 14,585.0 08:21 10:21 fighting weight transfer on wiper back n hole, 12/10/2018 12/10/2018 2.40 PROD2 DRILL DRLG P BOBD, 1.89 bpm at 4,217 psi, 14,585.0 14,646.0 10:21 12:45 Diff --1,130 psi, WHP=290, BHP=3.204, IA=774, OA=172 12/10/2018 12/1012018 2.00 PROD2 DRILL DRLG P BOBD, 1.89 bpm at 4,217 psi, 14,646.0 14,650.0 1245 14:45 Diff=1,130 psi, WHP=290, BHP=3,204, IA=774, OA=172 12/10/2018 12/1012018 0.15 PROD2 DRILL WPRT P BHA PU PUW 57 k 14,650.0 14,650.0 14:45 14:54 12/10/2018 12/10/2018 2.00 PROD2 DRILL DRLG P OBD, 1.78 bpm at 4,000 psi, 14,650.0 14,720.0 14:54 16:54 WHP=341, BHP=3,244, IA=775, OA= 179 PU @ 14,704' PUW 52 12/10/2018 12/10/2018 2.00 PROD2 DRILL DRLG P OBD, 1.78 bpm at 4,000 psi, 14,720.0 14,760.0 16:54 18:54 WHP=341, BHP=3,244, IA=775, OA=179 PU @ 14,749' PUW 56 It 12/10/2018 12/10/2018 2.00 PROD2 DRILL DRLG P OBD. 1.78 bpm at 4,000 psi, 14,760.0 14,763.0 18:54 20:54 WHP=341, BHP=3,244, IA=775, OA=179 PU 12/10/2018 12/10/2018 2.10 PROD2 DRILL DRLG P OBD, 1.78 bpm at 4,000 psi. 14,763.0 14,763.0 20:54 23:00 WHP=341, BHP=3,244, IA=775, OA=179 PU 12/10/2018 12/10/2018 0.30 PROD2 DRILL WPRT P 500' wiper up hole, PUW 56 It 14,763.0 14,263.0 23:00 23:18 12/10/2018 12/11/2018 0.70 PROD2 DRILL WPRT P Wiper back in hole, work pipe at 14,263.0 14,389.0 23:18 00:00 14322 and 14369' 12/11/2018 12/11/2018 2.00 PROD2 DRILL WPRT P continue running back to bottom after 14,389.0 14,762.0 00:00 02:00 500' wiper, Multiple set downs / tool face changes to work though 12/11/2018 12/11/2018 5.40 PROD2 DRILL DRLG P ON bottom, hard to get drilling, low 14,762.0 14,771.0 02:00 07:24 surface weight, low WOB, low differential pressure. Pump 30 BBI tubed bead pill. Unable to drill. Multiple pick ups. Run to bottom at speed. Attemp to stall motor 12/11/2018 12/11/2018 0.90 PROD2 DRILL WPRT P PUH while mixing 50 BBI beaded liner 14,771.0 14,773.0 07:24 08:18 1 running pill 12/11/2018 12/11/2018 1.90 PROD2 DRILL WPRT P Pill at bit, Wiper trip to window with Kl 14,773.0 10,535.0 08:18 10:12 tie in 12/11/2018 12/11/2018 0.10 PROD2 DRILL DLOG P Log K1 for+12' correction 10,535.0 10,561.0 10:12 10:18 12/11/2018 12/11/2018 2.70 PROD2 DRILL WPRT P Continue wiper trip to bottom, clean 10,561.0 14,777.0 10:18 13:00 pass though window, good trip to 13,600 slowed to 30 FPm losing string weight. Reduce pump rate due to high WHP. Continue in to bottom. Set down Q 14250 work to bottom 14777 12/11/2018 12/11/2018 2.70 PROD2 DRILL CIRC P Pit locked on fluids, Weigh up 14,777.0 14,777.0 13:00 15:42 completion fluid to 11.4 Build 50 BBI liner running pill. Recip pipe 12/11/2018 12/11/2018 0.70 PROD2 DRILL CIRC P Send liner pill down coil 14,777.0 14,777.0 15:42 16:24 Page 26127 Report Printed: 12/2612018 operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operatmn (flke) End Depth (WD) 12/11/2018 12/11/2018 1.90 PROD2 DRILL TRIP P POOH pumping beaded liner running 14,777.0 10,609.0 16:24 18:18 pill, PUW=58K, attempting to get returns, difficulty achieving reasonable returns holding 11.4 ppg at window (0.5 bpm in, 0.23 bpm out @ 2 fpm dropping to 11 ppg at window) 12/11/2018 12/11/2018 2.30 PROD2 DRILL TRIP P POOH, pump minimum rate, prep to 10,609.0 107.0 18:18 20:36 bullhead LRP & KWF from surface 12/11/2018 12/11/2018 1.30 PROD2 DRILL DISP P Bullhead 40 bbl LRP down to thief 107.0 78.0 20:36 21:54 zone (13,807'), followed by 11.4 ppg KWF to surface (2 bpm, WHP not exceeding -950 psi), tag up, PJSM 12/11/2018 12/11/2018 0.80 PROD2 DRILL PULD P Flow check, good, , UT coil, LD BHA 78.0 0.0 21:54 22:42 #24, losses - 25 bph, clear floor, bit came out a 1-1 (slight chip on reamer cutter) 12/11/2018 12/11/2018 0.30 COMPZ2 CASING BOPE P PU test jnt, function lest BOP's, lay 0.0 0.0 22:42 23:00 1 1 down test jnt 12/11/2018 12/12/2018 1.00 COMPZ2 CASING PUTS P PJSM, PU liner run #1 (ported BN, 24 0.0 400.0 23:00 00:00 jnts slotted liner, & shorty deployment sleeve) 12/12/2018 12/12/2018 1.00 COMPZ2 CASING PUTB P Complete PU liner run #1 (ported BN, 400.0 700.0 00:00 01:00 24 jnts slotted liner, & shorty deployment sleeve), perform kick while running liner drill 12/12/2018 12/12/2018 1.10 COMPZ2 CASING PULD P PJSM, PU BHA#25 Liner Running 700.0 750.0 01:00 02:06 Tools 12/12/2018 12/12/2018 2.10 COMPZ2 CASING RUNL P RIH w/ BHA#25 (liner win #1),-3.16' 750.0 10,551.0 02:06 04:12 comectioin to window flag, PEW = 451K, continue RIH 12/12/2018 12/12/2018 0.10 COMPZ2 CASING DLOG P -3.16' conectioin to window flag, PUW 10,551.0 10,548.0 04:12 04:18 = 45K, continue RIH 12/12/2018 12/12/2018 1.80 COMPZ2 CASING RUNL P Continie in, Clean through window and 10,548.0 14,770.0 04:18 06:06 down to 14770, Pump off liner, PUW=49 K 12/12/2018 12/12/2018 3.40 COMPZ2 CASING RUNL P Trip out for next liner segment, Tie in 14,770.0 79.0 06:06 09:30 for +13.5% Paint EDP flags @ 12,900 & 9500 12/12/2018 12/12/2018 0.40 COMPZ2 CASING OWFF P Tag up, Flow check well, establish 79.0 79-0- 09:30 09:54 1 1 1 static fluid loss rate @ 20 BPH 12/12/2018 12/12/2018 0.40 COMPZ2 CASING PULD P Lay down BHA #25 79.0 0.0 09:54 10:18 12/12/2018 12/12/2018 2.20 COMPZ2 CASING PUTS P PJSM, Prep floor. P/UALI-01 0.0 1,007.0 10:18 12:30 intermediate liner segment with ported bull nose, 33 Jts 2 3/8" slotted liner with shorty deployment sleeve 12/12/2018 12/12/2018 0.60 COMPZ2 CASING PULD P Make up coil track to liner, Make up 1,007.0 1,051.2 12:30 13:06 coil to coiltrak and surface test. Check pack offs, Make up injector to well 12/12/2018 12/12/2018 2.00 COMPZ2 CASING TRIP P Tag up and set counters, RIH BHA 1,051.2 10,551.0 13:06 15:06 1 1 #26 12/12/2018 12/12/2018 0.30 COMPZ2 CASING TRIP P 11515 correct to flag, +2.6'. Continue 10,551.0 11,515.0 15:06 15:24 in well 12/12/2018 12/12/2018 0.10 COMPZ2 CASING CLOG P Log Kt for+2'. Continue in well 11,515.0 11,565.0 15:24 15:30 without correcting 12/12/2018 12/12/2018 1.00 COMPZ2 CASING TRIP P Continue in well, Tag up @ 14069. 14,069.0 14,061.0 15:30 16:30 14071 corrected. PUW=55K. Pumps on release from liner, PUW=47K, 12/12/2018 12/12/2018 2.70 COMPZ2 CASING TRIP P Remove liner length left in hole, Trip 14,061.0 50.0 1630 19:12 out 12/12/2018 12/12/2018 0.70 COMPZ2 CASING PULD P PJSM, flow check, good, LD BHA#26, 50.0 0.0 19:12 19:54 1 clear floor, prep to PU linter Page 26127 Report Printed: 1212612018 operations Summary (with Timelog uepths) 2T-37 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our (hr) Phase Op cod. Acevlty Code Time P -T -X Operation (ftKB) Edd Depth (ftKB) 12/12/2018 12/13/2018 4.10 COMPZ2 CASING PUTB P PU liner run #3 (ported BN, 2' pup, 79 0.0 2.440.0 19:54 00:00 jnts slotted liner, & shorty deployment sleeve), clear floor Drill: kick while running liner 12/13/2018 12/13/2018 0.70 COMPZ2 CASING PULD P PU liner running tools, BHA #27, slide 2,440.0 2,488.0 00:00 00:42 in cart, check pack -offs, MU to coil, tag up 12/13/2018 12/13/2018 2.90 COMPZ2 CASING RUNL P RIH w/liner run #3 (BHA #27), -2.5' 2,488.0 10,064.0 00:42 03:36 correction to window flag, PUW = 47K, arrive at set depth, PUW = 57K, bring up pumps & release off liner, PUW = 41 K, TOL - 10,620' 12/13/2018 12/13/2018 1.80 COMPZ2 CASING TRIP P POOH w/BHA #27 10,064.0 60.0 03:36 05:24 12/13/2018 12/13/2018 0.40 COMPZ2 CASING PULD P PJSM, Lay down BHA on dead well 60.0 0.0 05:24 05:48 12/13/2018 12/13/2018 1.30 COMPZ2 CASING PULD P Prep floor for gyro run, PJSM P/U 0.0 74.9 05:48 07:06 BHA #28 Gyro test. Make up to coil and srface lest. Check pack offs. Tag up and set counters 12/13/2018 12/13/2018 2.30 COMPZ2 CASING DLOG P Trip in hole. Stop @ 636' prep for 74.9 1,136.0 07:06 09:24 Gyrotrak test. Pull initial surveys @ 636, 961, 986, 1011, 1036, 1061, 1086, 1111, 1136 12/13/2018 12/13/2018 0.30 COMPZ2 CASING TRIP P Completed first seris of tests. PUH 1,136.0 636.0 09:24 09:42 while circulating 1.6 BPM 12/13/2018 12/13/2018 1.70 COMPZ2 CASING DLOG P Repeal survey points 636.0 1,136.0 09:42 11:24 12/13/2018 12/13/2018 0.20 COMPZ2 CASING TRIP P Trip out 1,136.0 79.0 11:24 11:36 12/13/2018 12/13/2018 0.80 COMPZ2 CASING PULD P Flow check well, PJSM lay down BHA 79.0 0.0 11:36 12:24 #28 12/13/2018 12/13/2018 0.50 DEMOB WHDBOP PULD P M/U nozzle, Inspect packoffs, stab 0.0 0.0 12:24 12:54 injector on well 12/13/2018 12/13/2018 1.20 DEMOB WHDBOP CIRC P Line up and bull head 100 BBIs 0.0 0.0 12:54 14:06 seawater down tubing, PJSM with LRS to pump 35 BBIs diesel in T 12/13/2018 12/13/2018 1.60 DEMOB WHDBOP CIRC P Well displaced to seawater, Shut in 0.0 0.0 14:06 15:42 well. Pump diesel into coil followed by seawater recovering 11.4 PPG completion fluid to pits. Open well and bullhead diesel down wellbore. 12/13/2018 12/13/2018 2.30 DEMOB WHDBOP CIRC P Shut in well, jet stack and flush rig 0.0 0.0 15:42 18:00 surface lines, boroscope stack 12/13/2018 12/13/2018 1.50 DEMOB WHDBOP RURD P Work RD checklist, freeze protect tree, 0.0 0.0 18:00 19:30 disconnect hi -line power, chain off reel, secure injector cart 12/13/2018 12/13/2018 1.50 DEMOB WHDBOP NUND P Continue RD checklist, NO BOP 0.0 0.0 19:30 21:00 "Rig Released: 12/13/18 @ 21:00 hrs Page 27127 Report Printed: 1 212 612 01 8 ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 2T Pad 2T-371-1 50-103-20227-60 Baker Hughes INTEQ Definitive Survey Report 28 December, 2018 BA ER F�UGHES Er"n„" Conocolthillips RuralO COIMCOPIIIIIips Definitive Survey Report Company. ConocoPhillips(Alaska) Inc. Local Co-ordinate Reference: Vdele ZT-37 Prefect: Kupamk River Unit ND Reference: 2T49 a 122.00us8(Parker 245) SIh: Kuparuk 2T Pad MD Reference: ZT47 Q 122.00usle (Parker 245) Weak 2T-37 NOM Reference: True Wellbore: 2T-37 Survey Calculation Method: Minimum CunvaWh Design: 2T-37 Database: EDT 14 Alaska Production Pmfe n Kupahk Rarer Und, North Slope Alaska, United States Map system: US State Plane 1929 (Exact solution) System Datum: Mean Sea Lewl Gen Datum: NAD 1927 (NADCON CONUS) Ueirg MR Reference Point Map Zone: Alaska Zone 04 Using geodetic scale fader Wag ZTa7 — Well Position aW5 0.00 us. Nanta,: 5,969.882.48ua8 Latrude: 70`19'44.211N .E1 -W 0.00 ucft Easting: 498,944.62.58 Longihde: 150"0'30.814W Pasilum UncenalnW 0.00 us. Wellhead Elevation: us. Ground Level: 80.50 us8 Wellbore 2T -37L1 Ma9netics Model Name Sample Date Settlements. Dip Angle Field Strength M (art BGGM2018 12/112018 16l5 RD 85 57 427 Design 2T-3711 Audit Notes: Version: 1 0 Ph— ACTUAL Tie On Depth: 10,64952 Vertical Sodium Depth From ITVD) ew'-S eENMI Direction Iusnl (uem) (mm) 1'I 4150 0.00 0.00 180.00 Survey Pmgrzm Data From TO Surrey Survey (tell (ueft) Survey SNellbore) Tool Name Baluchistan Start Doh EM Dash 50.00 3.739.00 ZT-37 GymDaus (2T47) Copy of GYD-CT-CMS Gyration cont.casing Ms W25120D9 81252008 4.068.86 10,649.52 ZT-37(2T-37) MWD MWD -Standard 8/5/1995 815/1995 10,710.00 10,801.02 ZT-3711 MW INC(2T-371-1) MM-INC—ONLY MW NC ONLY_FILLER 111222010 11222018 10,821.03 13,566.20 2T -37L1 MWD(2T-37L1) MWD MWD -Standard 111212010 111252018 12252018 6.<6:30PM Page 2 COMPASS 5000.14 Rudd SSD CorwcoPhillips ConocoPhillips Definitive Surrey Report Company. ConocDPhilhps (Alaska) Inc Local Oorordmate Reference: Well 2T-37 Project: Kupemk River Unit NO Reference: 2T37@ 121.00ush(Parker 245) 5": Kupamk 2T Pad MD Reference. 2T3]@ 122.00uah(Parker 245) Well: 2T-37 North Reference: True Wellborn: 2T-37 Survey Calculation Method: Minimum Curvature O.I,.: 2T-37 Database'. EDT 14 Alaska Production Survey sk0 .0 Annotation TIP KOP Inter,olated Azimuth Ints,olated/vimulh Inreryolated7wmuth 1288/1076 6:46'30PM Pepe 3 COMPASS 5000.14 Budd 6529 Bing Medical MD 1. Ab ND NDSS +NIS +71471 Nstep adding wAt Sedan Suryq.Tool Name IaeM PI 11I (us") loss) (us") (MSM IDI (M pnov) INI 10.619.52 51120 Nin 5,795.24 5,673.24 -3,61086 -0,35.57 5,9552)701 49150928 2.19 3,610.86 MW INC ONLY (3) 10,71000 5084 24215 5.833.29 5,71129 -3,632.89 139211 5900251 an 481547.24 063 363209 MW INC ONLY (3) 10,]40.9] SR 24051 5,851.23 5729.23 -3.645.00 -7,419,22 5%683&89 491525.63 24M 364500 MW INC ONLY (3) 10,71.W 7111 23&21 5wook 5,742.06 -3.658.64 -7,44200 5,965225.25 491,50217 42.80 3658.64 MOOD -INC ONLY (3) 10.801.02 63.44 M07 5,870[5 5,748.65 -3.623.83 -7,467.59 5,965 210.06 4914])26 4131 3,6Y3.83 MW41NC ONLY (3) 10,821.03 92.09 237.33 5,871.43 5,749.43 -3,684.50 -7.401,48 5,95,19940 491,40637 A. 3,684.50 MWD(4) 10652.02 "As OfiX 5,96973 5.747.73 370300 -750&7T 5,95.180.31 49143608 wit 3)0360 MM/D(4) 10.802.21 94.15 215.76 5,867.5 5,75.53 $72627 -7528.51 5,95,157.64 491,416.34 34.89 3,T2527 M1WI4) 10,9112.03 9384 206.29 5,86544 5,7344 4,752.11 -7,543.14 skid 131.81 481401.71 413 375211 MWD(4) ID.942.15 94.92 129.23 5,05314 574114 .3,70069 -7,554.03 5,966,10603 49130.82 1391 3]0009 MWD 14) 10.972.24 wAl 15.14 5860.43 5]36.13 -3,808.64 -7,5&3.13 5906,075.29 491,301.71 1035 3,80&64 MWD(4) 11002.66 94.95 inn 5,85768 5]5.88 -3.83292 -7,570.95 5966,046D0 491.373.89 793 3.83792 MWD(4) 11,03160 94.06 191.15 5.855.40 5,733.40 -3.85.14 -0,57.23 5,95,01279 491,35260 &83 3,656.14 MWD(4) 80615 24.45 16272 5,853.17 5,73117 -3,895.65 -,582.19 5,955988.20 481.362.64 1214 3.89565 MAID (4) "1061.35 93.]1 385.7 5.851.06 5,729.00 4925.04 -7.585.53 5non .58.90 491,35.30 &74 3.925.04 MWD(4) 111Y1.16 92.27 into 504045 S.WAS -3.955.73 -7,507.74 5 96928.22 491,357.00 8.54 395573 MAD(4) 11152.31 9025 led" 584819 5,3X]9 -3.905.85 -7,506]0 5,965,898.10 49135.03 efi4 3,985.85 NWD(4) 11182.27 89.91 179.. 5,84814 5,]28]4 4015.81 -7,55.84 5,965888.14 491355.97 5.64 4,01581 MAD(4) 11121140 5.57 176.. 5.848.06 6,M,. 4,044.99 -0,50710 5,96563&% 491357.11 10.52 4.04499 MAD)4) 112415 87.61 173.5 5,84980 6,TP.60 4.07.94 -0,55.11 5,955.609.02 491,359.70 1(117 4,07494 MWO14) 112710 06.81 72.5 505107 51..07 4.104.84 -750151 5965,79.12 491,363.26 S. 4,30464 MW014) 11332.5 07.@ 3]618 5.85273 5,730.73 4,135.53 -7,9651 555748.43 491,356.29 11.02 413553 MW014) 11.332.15 07.18 Valk) 5054.23 518.23 -0.165.03 -7,577.40 5,55,718.94 491,39.39 11.23 4416503 MPoD(4) 1135193 0227 l8ln 5.8567 5]33.67 4.194.77 -7,577.67 5,965,889.. 491,.57.12 602 4,1947 MWD(4) 1151.38 5.01 184.46 5,85.87 5,Ts1.88 4.224.15 -7579.20 596565902 491,365.58 10.. 4,2M15 MWD(4) 11422to 562 101.47 5.8525 5135.5 4,254.82 -7.580.79 5,965029.16 491363.99 1024 4.254.62 MAD(4) 11451.68 87.48 1768 5,85857 5,76.9 4.204.37 -7,580.33 555599.61 491,354.45 169 428437 MAD(4) 11483.35 5.35 1$9 5,86054 5,738.54 -0,315.90 -7578.20 5,965,568.07 491,35.57 Tot 431590 MAD(4) 11,0201 05.64 f27 5,86246 5740.46 <,340.tfi -7,575.71 5,965543.02 ul..65 1167 4.340.16 MMU(4) 11536.51 8483 168.75 5,86483 574283 4..8.38 -0.57111 5,5551560 491.37.65 1402 4,33830 MAD(4) sk0 .0 Annotation TIP KOP Inter,olated Azimuth Ints,olated/vimulh Inreryolated7wmuth 1288/1076 6:46'30PM Pepe 3 COMPASS 5000.14 Budd 6529 Survey ConocoPhillips Conickal Definitive Survey Report Map C..P.W.. ConowPhiXips (Alaska) Inc. Local Cocodinate Reference: Mil 2T47 Pm)ecC Kupamk Riser Unit TVD Rehrence: 1T47@ 122.00usft (Parker 245) SM: Kupamk 2T Pad MD Reference: 2T47 ®122.UDusft (Parker 245) WOOL 2T47 North Refersom True Well0or6: 2TJ7 Survey Calculation Methotl: Minimum CunaWte Deal 2TJ7 Database: EDT 14 Alaska PW..t.n Survey Annotation e 1212110010 6:46:3 Page 4 COMPASS 5000.14 Boat! 850 Map Map Vertical MO Inc Axl TVD TVDSS rN15 ,E(4M Estill., OLS Se( (9 P) Nae) loan) loan) (usft) Northing (• HOPI Survey Tool Name (-to ( (Rl (ft) ft) 11,55625 85.67 165.75 5,06].28 5,74&38 4.397,29 -],564.5] 5,935.486]0 491380.19 1038 4387 29 MD (4) 11,596.39 %RB 163.99 5,669.24 5.]4].24 -0,426.32 -],550.]2 5965.45].6] 491,360.03 7,04 4,@632 MAD(4) 11 WAS MISS 163.01 5,M39 5.740.3. -0455.83 -7.547,90 5,965.428.16 491.395.]] 7.23 4,455.03 MND(4) 1165753 06.96 16525 5,071.50 5,748.50 4484.99 -7.639.69 5,%5388.03 491.40506 9.68 4,40499 MND(4) 11,68]26 55.62 16793 5,6]346 5.751.16 -0,513.86 -7.53280 5,965.3]0.13 481411.06 9A] 451386 M (4) 11]1].]] 86.41 171,33 S,B]S.Ot 5,753.01 -0,543.81 -],52]32 5,865,340.18 491.417.41 11.14 4,54301 soon (4) 11]46.35 N.I. 174.06 5,878.85 5.754.85 -0.58.12 -7,52191 5955,311.87 491.420.02 1264 4,57212 M (4) 11,]]6.03 85.67 Mac 58]9.03 5.]5]03 4,602.46 4,521.94 5,955,28154 491422]. 8.85 4,60246 11 11,63749 W.74 17SW 5801.- 5,759.06 4,633.04 4.521.24 5,%5206.96 49142348 796 4,53304 MND(4) 11,83]1] 87," 18271 5,80249 5.70649 4,68.68 4,521.89 5.96522133 4.4.422.02 10.35 4,662.60 MND(4) 11,656.01 07.06 181.90 S,B&3l0 5,761.70 -AM.32 4,M..87 6N5.1.169 481420.84 7.50 4,69232 ~(4) 1188709 0].[6 186]8 5885.11 5.]63.11 -Am.31 -7,52605 5,951 491417.76 6.55 4,73231 MD (4) 11,926.87 07.89 19109 5,885.47 5.]&4] -4]5168 4,531.57 5,955,132.32 491413.13 1,62 4,751.69 MND(4) 11,957.01 lan 193.00 5,007.41 5.]65.0] -0,78131 -],53].00 5965.102.71 4BIA0762 508 4781.31 Ol(4) 11.06721 0634 193.02 5,1107.50 tirM564 4,811.05 4,542.33 5,9050896 491402.36 5.20 4,811.05 MD (4) 12,01855 WS2 18saw 5886.81 5}06.91 4840.01 -0,506.94 5,8650"02 481.38776 10.W 4,040.01 MND(4) 12.05.81 02,95 MAO 5085.51 5,763.51 4.86's 04 -],550.26 5ON 014W 491.39441 10.14 4.069.04 MD (4) 12,07627 09.60 10653 5,884.83 5,]6203 -0M,4 -7,55177 5,9f mom 491.3@.91 10.62 4698.44 MD (4) 4.141.58 88.74 178.13 5,805.27 5,]63.2] 4,929.]5 -7,55141 5,9"Na.29 491,393.2] 836 4,928.75 MD (4) 12,13773 Ski 175.0 SOWS) 5.]63.50 N,960.84 -7549.74 5,964,923.19 491,390.90 BOS 4,960.84 MD (4) 12167.32 90.52 17364 5005.00 S.M." 4,850.30 4,546.98 5984893.]4 08139769 8.03 4,990.30 MD (4) 1]195,]8 9028 16911 5665.50 5,]63.06 -5,019.45 4,542.8 5,96am So 49140195 13.36 5,01945 MWD(4) 12.22787 9083 IWA3 5,885.33 5,]06.33 5.049.64 -7,536.22 5,954834.20 491400.0.5 1165 504904 MWD (4) 4.25].4] 8951 162]4 5,885.25 5LM' 5 -5077.07 -7 SAAB 5964,806.41 49141620 1245 5,07].9] MWD(4) 12,07.14 WAS 10657 5,88526 5,41396 -5,106.99 4,518.48 5964,777.6fi 491426.10 10.76 5,106.99 MWD(4) 12,31950 90.06 158.05 5,084.90 5]62.06 5,136.39 -7505.49 5,964)4766 an436t6 1115 5,136.39 MWD (4) 12,M7.78 09.08 im3S,t 5884.91 5 M 5,10196 -7,494.45 5964,]22.0] 491450.20 10.97 5,16190 MD (4) 12,37781 6655 155.87 5,805.52 5MS2 5181 -7481.86 5961,681.02 49142.76 11.22 5,16923 MWD(4) 12,47.90 6905 10657 SOMAS 5,]64.15 4, 21].30 -7470.91 594,66611 4914]3.8 1236 5,217.34 MWD (4) 1243]]0 9031 W6 5.805.32 570032 5245.77 -742.2 5964,63629 491462W 1456 5,245.77 MWD(4) 4.466.59 90.55 16032 5 S 10 5764.10 -5273]6 -7455.31 5904810.28 49140SS1 4.2 5.2]3.]8 MWD (4) Annotation e 1212110010 6:46:3 Page 4 COMPASS 5000.14 Boat! 850 Conocophillips Q ConocoPhillips Definitive Survey Report Company: Cmm,Philips (Alaska) Inc. Local CocNinate Reference: Wes ZT47 PreiecC Kuparuk Rivet Unit TVD Reference: 2T-6]@ 122.00us0(Parker 245) ane: Kupmuk 2T Pat! MO Reference: 2T47 @ 122.00u50 (Pa4kef 245) Well: 2T29 North Reference: Tons We10on, 2Ta7 Survey Calculation Method: Minimum Cunmere Design: 2407 Dabfiase: EDT 14 Alaska PmEuction Survey 121184018 6:463011. Pages COMPASS 5000 14 &0 BW Map Map Vertical MD Inc Aal TVD NDSS .1415 «E -W Northing Easting OLS Section Survey Tool Name Annotation push) (•( PI (uas) (.pit) puss) pass) (us") (•1100'( 1 (s) I)) (I 13496.55 90.21 17048 586590 5763.91 -5.30322 -744980 5,964580 .04 Oil not2 7 30 5,303.22 MADO4) 12.526.91 9058 173,W 58&570 5.703.70 5.33329 -7,44585 5.964,550.]] 49149097 11.03 5.33339 Myth (4) 12,556]4 8836 1]6.68 5,8%.]1 5.76571 5,:83.02 4,44317 5.%4.521.05 491501.M 1049 5.353.03 MN0(4) 12,586.83 San 1324 SBB6M 5.]64.20 5,393.08 -744210 5,934.49099 491,50350 0.73 5,30308 MND(4) 12.616.19 89.30 10258 5,M70 5,76430 542243 -7,44257 5,%4,46164 01,50203 11.52 5,422.43 MAD (4) 12,978.05 89.14 18564 SN7,13 5,765.13 4454.20 -74..85 5,954.429.87 4914%7S 9¢ 5,454.30 MN0(4) 12.675.59 9098 10513 5,087A0 5,][5.10 5,482.53 -744027 5.964,401.55 4SIA%32 10.65 5,482.53 MM)(4) 12.]0].60 89.39 191.13 5,997.97 5,765.00 5513.10 -7,45346 5,964,37098 491491.13 10.95 5,513.10 Paul) (4) 12,]3].15 as (o note 5,887.41 5765.41 5.54198 -7,45960 5,954.34210 491484.90 7.08 5.541.98 MAR)(4) 13.7duSli 89.]8 185.8 5881`2 5,7658 5570.45 4,467,02 5.%4,31364 491.47156 0.90 5.5345 MND(4) 12,7116.34 San 193.33 SAWN 5,765.02 6.599.28 Q47449 5,954.284.81 49143.69 602 5,599.28 MND(4) 12.027.03 89M 189.69 5.080.13 5766.13 5,629.35 -7,4W.61 5,964354.75 01463.% 12.14 5.68.35 MAU(4) 12,855.31 0050 18111 5.888.66 5,]66.6] 565629 4,465.0 5.90432581 4914590 6.]] 5,656.29 MAD (4) 12.811 88'. 163.65 5,889.31 5,767.31 560864 -],488.W 5954185.45 491456.51 13.32 5,690.64 MOR) (4) 12,915.84 0503 18121 5.890.45 6,7WAS 5.]1].60 -],469.29 5954.797.51 49145521 10.55 6,717.60 Miss (4) 12,946.19 8164 179.69 5.89191 5,769.91 5,74191 4489.37 5,964,13620 491455.19 ].4] 5,747.91 MAD (4) 12,976.70 89.35 176.81 SAW11 5,77011 6,]]847 -7.488.8 5,951 491.45028 9.31 5,77847 MND(4) 13.0.15.59 8133 17397 5.89358 5nIN 5.808.17 -7,465.00 5.964,075.95 49145467 1169 5,808.17 M.ND(4) 13,035% 0702 1]1]8 5094.82 5,]71.82 5,63]2] 7,482.24 595404865 491,46230 7.64 5.817.27 MND(4) 13,08197 BBa3 INN 5,895.5] 5773.57 5,86258 -0,470.15 5.964.02154 49146.8 8.45 5,862.56 MND(4) 13971.52 8066 167.40 5,896.37 6,774.37 6,891.90 -7,4825 5,95399222 49147228 95a 5,69190 MAD (4) 13.121.24 89.57 165.32 58%.90 5,]7496 5920.77 -7,40$.2$ 5,963,963.35 4914328 8.59 5,98.77 MMD(4) 13,150.40 90.25 163.82 589103 5,]]503 6,948.88 -7,45749 5,963.935.24 491467.04 565 5,948.88 MJVD(4) 13187.26 89.32 162.97 5.097.16 5,]]5.17 5.984.20 -7,446.86 5.963.899.92 491487.% 342 SW4.20 MMU(41 13,210.61 as% 162.]] 5097.58 5,77558 me.71 -7,44092 5,963,87]42 491504.50 2.97 6.035.71 MND(4) 13,241211 60.43 161.71 5.898.36 5,]]6.36 4.03564 -].433.]6 5,%3.64049 491513.76 3.55 5.055.64 MND(4) 13271.34 85.9 16.33 5.900-04 5770.0 3,064.09 -7.48.97 5,96382004 491,52354 11.74 6,064.09. MWD(4) 13,301.92 8591 197.. 5.902.42 5,]8042 -6992.81 -],410]4 5963791.32 491.%377 245 0,092.81 MMD(4) 13,330.83 08.% 165.03 5.90.21 578231 512035 -7,402A8 5903.70378 .1$42.32 1628 Q18.35 MAD(a) 13.1. 6552 168.01 5.606.20 5,]84.20 4.149.95 -],395.08 5,953,73419 491.549.41 10.88 6.149.95 MND(4) 13391.32 BS. 17033 5,900.51 5780.51 417931 4,397.45 5983.70.82 491555.03 172 6.99.31 MND(4) 121184018 6:463011. Pages COMPASS 5000 14 &0 BW hillipConoeoPhillips Conocoefinitive 5 O Survey Report Comparry: CouccoPhillips (Alaska) Inc. Local Cc oNinate Reference: We112T-37 PrI Kupamk River Unit ND Reference: 2T -3T@ 122.01 (Parker 245) SM: Kupamk 2T Pad MO Reference'. 2T -3T@ 122.00usR(Parker245) Well: 2T37 Nonb RMmm..- Tore Wellbore: 2TJ7 Survey Calculation Methad: Minimum Curvature Design: 2T47 Database: EDT 14 Alaska Production Survey lWWD18 6:46:SOPM Pogo 6 COMPASS IWD 14 Build 650 MapMed MD Inc Hal 111D MOSS 'we, WJ NoI " Eased, DES DES Stolen n Survey Tool Name Annotation (.ft)e) 1`I I'1 (-ft) liked) (use) 1-i (1t) rt) (e) ( 13 420 ]6 BG.41 1]34] 5.810.55 5,788.55 412001 -7,36533 59636]5]5 491$59.16 1095 6.2.2 08.38 MWD (4) 13451M 88.13 1]562 5,91200 579000 8,238.48 -],362.45 5,583845.66 49t562.N 909 6,23848 MWD (4) i3, 480.85 90.55 1]6]0 5,91234 5790.34 8,26823 -7,360.46 5.913,61592 491500.02 889 6,269.23 MND (4) 13,511.91 9209 1]].94 5,911. 5)89.62 8,269.26 -73]9.00 5.963.564.87 491 ,36 6.5928 WD (4) 13.X1. 93.38 18.96 5,91021 5788.21 45,32B73 -0,378.21 5,%3,555.42 491.51 561 6,328.73 MND (4) 13661 91 1815 5,111 5]86.8] 41,353.45 ..378.26 5.963.53070 4915.. 946 6.353.45 Mitts) (4) 13,Ep1p3 9293 1815 5.007.16 5765.16 41,38820 ..37903 5963495.95 491.66543 0.00 6.38820 PRO.ECTED 10 TD lWWD18 6:46:SOPM Pogo 6 COMPASS IWD 14 Build 650 BA ER F�UGHES a GE company Date: January 4, 2019 Abby Bell AOGCC 333 West 7`h Ave, Suite 100 Anchorage, Alaska 99501 21 81 19 30197 Letter of Transmittal Michael Soper Baker Hughes, a GE Company 795 East 94th Avenue Anchorage, Alaska 99515 lease find enclosed the directional survey data for the following well(s): 2T -37L1 2T-37L1-01PB1 2T-37L1-01PB2 2T -37L1-01 RECEDE® JAN 0 4 2019 AOGCC (4) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Applications Engineer Michael.Soper@BakerHughes.com ConocoPhillips ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kuparuk 2T Pad 2T -37L1 50-103-20227-60 Baker Hughes INTEQ Definitive Survey Report 28 December, 2018 BAT(ER UGHES a GE company 21 01 19 30 19 7 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 2T-37 Project: Kuparuk River Unit TVD Reference: 2T-37 @ 122.00usft (Parker 245) Site: Kupamk 2T Pad MD Reference: 2T-37 @ 122.00usft (Parker 245) Well: 2T-37 North Reference: True Wellbore: 2T-37 Survey Calculation Method: Minimum Curvature Design: 2T-37 Database: EDT 14 Alaska Production Project Kuparuk River Unit, North Slope Alaska, United Slates Map System: US Stale Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 2T-37 Mean Sea Level Using Well Reference Point Using geodetic scale factor H 1 HvCSS Well Position +N/ -S 0.00 usft Northing: 5,969,882.48usft Latitude: 70° 19'44.211 N +E/ -W 0.00 usft Easting: 498,944.62usft Longitude: 150° 0'30S14 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground level: 80.50 usft Wellbore 2T-3711 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (1) V) (nT) BGGM2018 12/1/2018 16.75 80 85 57,427 Design 2T-3711 Audit Notes: Version: 1.D Phase: ACTUAL Tie On Depth: 10,649.52 Vertical Section: Depth From (TVD) +N/S +EI -W Direction (usft) (usft) (usft) V) 41.50 0.00 0 00 180.00 d I Survey Program Date From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 50.00 3,739.00 2T-37 GyroData (2T-37) Copy of GYD-CT-CMS Gyrodata cont.casing m/s 6/25/2009 6/25/2009 f 4,068.86 10,649.52 2T-37 (2T-37) MWD MWD- Standard 8/5/1995 8/5/1995 10,710.00 10,801.02 2T-3711 MWD -INC (2T-3711) MWD-INC—ONLY MWD -INC ONLY FILLER _ _ 11/22/2018 11/22/2018 13,566.20 MWID 2T-3711 MD(2T-371-1) MWD MWD - Standard 11/21/2018 11/25/2018 12/282018 6:46.30PM Page 2 COMPASS 500014 Build 85D ConocoPhillips BA(ER UGHFS ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. Local Co-ordinate Reference: Well 2T-37 Y Project: Kuparuk River Unit TVD Reference: 2T-37 @ 122.00usft (Parker 245) Site: Kuparuk 2T Pad MD Reference: 2T-37 @ 122.00usft (Parker 245) Well: 2T-37 North Reference: True Wellbore: 2T-37 Survey Calculation Method: Minimum Curvature Design: 2T-37 Database: EDT 14 Alaska Production Survey.__.-.______"__ ��...v..._,....._..._.e.......�._vy.....e�e.....,..s. .....�.. �___._��.._..__._ _. cal MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Esastiing DLS Section lest) (1) C) (eeft) (rift) fust[) (usft) (:°7100•) Survey Tool Name Annotation (ft) (ft) (ft) 10,649.52 51.20 241.98 5,795.24 5,673.24 -3,610.86 -7,355.57 5,966,273.01 491,589.28 2.19 3,610.86 MWD-INC_ONLY (3) TIP 10,710.00 50.84 242.15 5,833.29 5,711.29 -3,632.89 -7,397.11 5,966,251.00 491,547.74 0.63 3,632.89 MM -INC _ONLY (3) KOP 10,740.97 58.29 240.51 5,851.23 5,729.23 -3,645.00 -7,419.22 5,966,238.89 491,525.63 24.44 3,645.00 MWD -INC -ONLY (3) Interpolated Azimuth 10,771.05 71.11 239.21 5,864.06 5,742.06 -3,658.64 -7,442.68 5,966,225.25 491,502.17 42.80 3,658.64 MM -INC _ONLY (3) Interpolated Azimuth 10,801.02 83'4 238.07 5,870.65 5,748.65 -3,673.83 -7,467.59 5,966,210.07 491,477.26 41.31 3,673.83 MWD-INC_ONLY (3) Interpolated Azimuth 10,821.03 92.09 237.33 5,871.43 5,749.43 -3,684.50 -7,484.48 5,966,199.40 491,460.37 43.39 3,684.50 MWD (4) 10,852.02 94.18 226.32 5,869.73 5,747.73 -3,703.60 -7,508.77 5,966,180.31 491,436.08 36.11 3,703.60 MWD(4) 10,882.21 94.15 215.76 5,867.53 5,745.53 -3,72627 -7,528.51 5,966,157.64 491,416.34 34.89 3,726.27 MWD (4) 10,912.03 93.84 203.29 5,865.44 5,743.44 -3,752.11 -7,543.14 5,966,131.81 491,401.71 41.73 3,752.11 MM (4) 10,942.15 94.92 199.23 5,863.14 5,741.14 -3,780.09 -7,554.03 5,966,103.83 491,39082 13.91 3,780.09 MWD (4) 10,972.24 95.41 196.14 5,860.43 5,738.43 -3,808.64 -7,553.13 5,966,075.29 491,381.71 10.36 3,808.64 MWD (4) 11,002.68 94.95 193.76 5,857.68 5,735.68 .3,837.92 .7,570.95 5,966,046.00 491,373.89 7.93 3,837.92 MWD (4) 11,03168 94.06 191.35 5,855.40 5,733.40 -3,866.14 -7,577.23 5,966,017.79 491,367.60 8.83 3,866.14 MWD (4) 11,061.69 94.46 187.72 5,853.17 5,731.17 -3,895.65 -7,582.19 5,965,988.29 491,362.64 12.14 3,895.65 MWD (4) 11,091.35 93.72 185.23 5,851.06 5,729.06 .3,925.04 .7,585.53 5,965,958.90 491,359.30 8.74 3,925.04 MWD(4) 11,122.16 92.27 183.03 5,849.45 5,727.45 -3,955.73 -7,587.74 5,965,928.22 491,357.08 8.54 3,955.73 MWD (4) 11,152.31 90.25 180.94 5,84879 5,72679 -3,985.85 4,588]8 5,965,898.10 491,356.03 9.64 3,985.85 MWD (4) 11,182.27 89.94 179.28 5,848.74 5,726,74 4,015.81 -7,588.84 5,965,868.14 491,355.97 5.64 4,015.81 MM (4) 11,211.48 89.57 176.23 5,848.86 5,726.86 4,044.99 -7,587.70 5,965,838.96 491,357.11 10.52 4,044.99 MWD (4) 11,241.55 87.61 173.88 5,849.60 5,727.60 4,074.94 -7,585.11 5,965,809.02 491,359,70 10.17 4,074.94 MM (4) 11,271.70 86.81 172.53 5,851.07 5,72967 4,104.84 -7,581.54 5,965,779.12 491,363.26 5.20 4,104.84 MWD (4) 11,302.59 87.02 176.18 5,852.73 5,730.73 4,135.53 -7,578.51 5,965,748.43 491,365.29 W112 4,135.53 MAID(4) 11,332.15 87.18 179.50 5,854.23 5,732.23 4,16503 -7,577.40 5,965,71894 491,367.39 11.23 4,165.03 MWD(4) 11,361.93 87.27 181.53 5,855.67 5,733.67 4,194.77 -7,577.67 5,965,689.20 491,367.12 6.82 4,194.77 MWD (4) 11,391.38 88.04 184.46 5,856.87 5,734.88 4,224.15 -7,57920 5,965,65962 491,365.58 10.26 4,224.15 MAID (4) 11,422.10 89.02 181.47 5,05266 5,735.66 4,254.82 -7,580.79 5,965,629.16 491,363.99 10.24 4,254.82 MAD (4) 11,45168 8748 176.72 5,858.57 5,735.57 4,284.37 -7,580.33 5,965,59961 491,364.45 16.87 4,284.37 MM (4) ',. 11,483.35 85.36 175.57 5,860.54 5,738.54 4,315.90 -7,578.20 5,965,568.07 491,366.57 7.61 4,315.90 MWD (4) 11,507.81 8564 172.72 5,86246 5,74046 4,340.16 .7,575.71 5,965,543.82 491,369.05 11.67 4,340.16 MM (4) 11,536.51 8490 168.75 5,864.83 5,742.83 4,368.38 -7,571.11 5,965,515.60 491,373.65 14.02 4,368.38 MM (4) 12/282018 6*46:30PM Page 3 COMPASS 5000.14 Build 85D 1. ConocoPhillips B ER ConocoPhtlh 5 Il1GHES p Definitive Survey Report Company: '.''. Project: Site: Well: wellbore: "i Design: Survey i MD (usft) 11,56625 11,596.39 11,62719 11,657.53 11,68726 11,717.77 11,746.35 11,776.83 11,80T49 11,837.17 11,866.91 11,897.09 11,926.87 11,957.01 11,987.21 12,016.55 12,045.81 12,076.27 12,106.58 12,137.73 12,167.32 12,196.78 12,227.87 12,257.07 12,287.74 12,319.50 12,347.78 12,377.81 12,407.99 12,437.78 12,466.59 ConocoPhillips (Alaska) Inc. Kuparuk River Unit Kupamk 2T Pad 2T-37 2T-37 2T-37 Inc 85.67 86.86 88.86 86.96 8642 86.44 86.16 85.67 86.74 87.73 87.60 87.05 87.69 88.77 90.34 92.52 92.95 89.60 88.74 89.32 90.52 90.28 90.83 89.51 90.43 90.89 89.08 88.56 89.05 90.31 90.55 12/282018 646:30PM Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 2T-37 2T-37 @ 122.00usft(Parker 245) 2T-37 Q 122,00usft (Parker 245) True Minimum Curvature EDT 14 Alaska Production Page 4 Annotation COMPASS 5000.14 Build 85D Map Map Vertical Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (I (usft) Weill) (usft) (usft) (7100') Survey Tool Name (ft) (ft) (R) 16515 5,867.28 5,745.28 4,397.29 -7,564.57 5,965.4W 70 491,380.19 1038 4,397.29 MWD (4) 163.99 5,869.24 5,747.24 4,426.32 -7,556.72 5,965,45]67 491,388.03 7.04 4,426.32 MWD (4) 163.01 5,870.39 5,748.39 -4,455.83 -7,547.98 5,965,428.16 491,396.77 7.23 4,455.83 MWD (4) 165.25 5,871.50 5,749.50 4,484.99 -7,539.69 5,965,399.00 491,405.06 9.68 4,484.99 MWD (4) 167.93 5,873.16 5,751.16 -4,513.86 -7,532.80 5,965,370.13 491,411.94 9.07 4,513.86 MWD(4) 171.33 5,875.01 5,753.01 -4,543.81 -7,527.32 5,965,340.18 491,417.41 11.14 4,543.81 MWD (4) 174.94 5,876.85 5,754.85 4,572.12 -7,523.91 5,955,311.87 491,420.82 12.64 4,572.12 MWD (4) 177.60 5,879.03 5,757.03 4,602.46 -7,521.94 5,965,281.54 491,422.79 8.85 4,602.46 MWD (4) 179.80 5,661.06 5,759.06 4,633.04 -7,521.24 5,965,250.96 491,423.48 7.96 4,633.04 MWD(4) 182.71 5,882.49 5,760.49 4,662.68 -7,521.89 5,965,221.33 491,422.82 10.35 4,662.68 MWD (4) 184.94 5,883.70 5,761.70 4,692.32 -7,523.87 5,965,191.69 491,420.84 7.50 4,692.32 MWD (4) 166.78 5,885.11 5,763.11 4,722.31 -7,526.95 5,965,161.70 491,417.76 6.36 4,722.31 MWD (4) 191.09 5,886.47 5,764.47 4,751.69 -7,531.57 5,965,132.32 491,413.13 14.62 4,751.69 MWD (4) 190.00 5,887.41 5,765.41 4,781.31 -7,537.08 5,966102.71 491,407.62 5.09 4,781.31 MWD(4) 190.02 5,887.64 5,765.64 4,811.05 -7,542.33 5,965,072.98 491,402.36 5.20 4,811.05 MM (4) 188.04 5,886.91 5,764.91 4,840.01 -7,546.94 5,965,044.02 491,397.76 10.04 4,840.01 MWD (4) 185.10 5,865.51 5,763.51 4,869.04 -7,550.28 5,965,014.99 491,394.41 10.14 4,869.04 MWD (4) 180.52 5,884.83 5,762.83 4,899.44 -7,551.77 5,964,984.59 491,392.91 18.62 4,899.44 MWD(4) 178.13 5,88527 5,763.27 4,929.75 -7,551.41 5,964,954.29 491,393.27 8.38 4,929.75 MWD (4) 175.69 505.80 5,763.80 4,960.84 -7,549.74 5,964,923.19 491,394.94 8.05 4,960.84 MWD (4) 173.64 5,885.84 5,763.84 4,990.30 -7,546.98 5,964,893.74 491,397.69 8.03 4,990.30 MWD (4) 169.71 5,88564 5,76364 5,019.45 -7,542.72 5,964,864.60 491,401.95 13.36 5,019.45 MWD (4) 16513 5,885.33 5,763.33 5,049.84 -7,535.22 5,964,834.20 491,406.45 11.65 5,049.84 MWD (4) 162.74 5,88525 5,76325 -5,077.97 -7,528.38 5,964,806.08 491,416.28 12.46 5,077.97 MAID (4) 159.57 5,885.26 5,76326 5,106.99 -7,518.48 5,964,777.06 491,426.18 10.76 5,106.99 MM (4) 156.06 5,884.90 5,762.90 -5,1w 39 -7,506.49 5,964,747.66 491,438.16 11.15 5,136.39 MWD (4) 153.54 5,884.91 5,762.91 5,161.98 -7,494.45 5,964,722.07 491450.20 10.97 5,161.98 MWD (4) 156.87 5,885.52 5,763.52 5,189.23 -7,481.86 5,964,69482 491,462.78 11.22 5,189.23 MVD (4) 160.57 5,886.15 5,764.15 5,217.34 -7,47091 5,964,666.71 491,473.72 12.36 5,217.34 MWD (4) 164.72 5,886.32 5,764.32 -5.245.77 -7,462.02 5,964.63829 491,482.60 14.56 5,245.77 MM (4) 168.32 5,886.10 5.764.10 -5.273.78 -7,455.31 5,964.61028 491,489.31 12.52 5,273.78 MWD (4) Page 4 Annotation COMPASS 5000.14 Build 85D ConocoPhillips Company: ConocoPhillips (Alaska) Inc. Project: Kuparuk River Unit Site: Kuparuk 2T Pad Well: 2T-37 Wellbore: 2T-37 Design: 2T-37 1,.-W ___-__-"-__`____._'_..�.�..__v. __. ... ....... ...... ._. ......... _.., .-_ ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: .._.......,._...._,.._...._._.._�....,�..,.�...dc.....- Well 2T-37 2T-37 @ 122.00usft (Parker 245) 2T-37 @ 122.00usft (Parker 245) True Minimum Curvature EDT 14 Alaska Production eA ER tuts .:....._.._,.....,...«_.....�.,..�......__. Survey Map Map Vertical MD Inc Aid TVD TVDSS .N/ -S +E/ -W DLS (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting (°1100') Section Surve Tool Name y Annotation (ft) (ft) (ft) l 12,496.55 9021 17048 5,885.90 5,763.91 -5,30322 -7,44980 5,96,58064 491,494.82 7.30 5,303.22 MWD (4) 12,526.91 90.58 173.80 5,885.70 5,763.70 -5,333.29 -7,44565 5,964,550.77 491,498.97 11.00 5,333.29 MWD (4) 12,556.74 8936 176.68 5,885]1 5,76331 -5,363.02 -7,443.17 5,96.52105 491,501.44 10.49 5,363.02 MWD(4) 12,586.83 8877 179.24 5,886.20 5,764.20 -5,393.08 -7,442.10 5,964,490.99 491,502.50 8.73 5,393.06 MWD (4) 12,616.19 89.30 182.58 5,886.70 5,764.70 -5,422.43 -7,442.57 5,964,461.64 491,502.03 11.52 5,422.43 MWD (4) 12,648.05 89.14 185.64 5,887.13 5,765.13 -5,454.20 -7,444.85 5,964,429.87 491,499.75 9.62 5,454.20 MWD(4) 12,676.59 90.98 188.13 5,887.10 5)65.10 -5,482.53 -7,44827 5,964,401.55 491,496.32 10.85 5,482.53 MM (4) 12,707.60 89.39 191.13 5,887.00 5,765.00 -5,513.10 -7,453.46 5,964,370.98 491,491.13 10.95 5,513.10 MVJD (4) 12,737.15 89.02 193.19 5,887.41 5,765.41 -5,541.98 -7,459.68 5,964,342.10 491,41MA0 7.08 6,541.98 MWD (4) 12,765.55 89.78 195.72 5,887.72 5,765.72 -5,570.45 -7,467.02 5,964,313.64 491,477.56 8.99 5,570.45 MWD (4) 12,796.34 89.82 193.33 5,887.82 5,765.82 -5,599.28 -7,474.49 5,964,28481 491,47009 8.02 5,59928 MWD (4) 12,827.03 89.02 189.69 5,888.13 5,766.13 -5,629.35 -7,480.61 5,96.25475 491,463.96 12.14 5,629.35 MWD (4) 12,856.31 88.90 187.71 5,888.66 5,766.67 -5,658.29 -7,485.04 5,964,22561 497 459.53 6.77 5,658.29 MWD (4) 12,886.83 88.68 18365 5,889.31 5,767.31 -5,688.64 -7,488.06 5.964.195.46 491,456.51 13.32 5,688.64 MVJD(4) 12,915.84 86.83 181.21 5,890.45 5,768.45 -5,71260 -7,489.29 5,964,166.51 491,455.27 10.55 5,717.60 MWD(4) 12,946.19 87.64 179.09 5,891.91 5,769.91 -5,747.91 -7,489.37 5,964,13620 491,455.19 7.47 5,747.91 MVJD(4) 12,976.78 89.35 176.81 5,892.71 5,770.71 -5,778.47 -7,488.28 5,964,105.64 491,456.28 9.31 5,778.47 MM (4) 13,006.59 87.33 173.97 5,893.58 5,771.58 -5,808.17 -7,485.88 5,964,07595 491,45867 11.69 5,808.17 MWD (4) 13,035.95 87.82 171.78 5,894.82 5,772.82 -5,837.27 -7,48224 5,964,046.85 491,462.30 7.64 5,837.27 MWD (4) 13,061 60 88.83 169.86 5,895.57 5,773.57 -5,852.58 -7,478.15 5,964,021.54 491,466.39 8.45 5,862.58 MM (4) 13,091.52 8809 167.40 5,896.37 5,774.37 -5,891.90 -7,472.26 5,963,99222 491,472.28 8.58 5,891.90 MM (4) 13,121.24 89.57 165.32 5,896.98 5,774.98 -5,920.77 -7,46525 5,963,963.35 491,479.28 8.59 5,920.77 MWD (4) 13,150.40 9025 10.82 5,897.03 5,775.03 -5,948.88 -7,457.49 5,963,93524 491,487.04 5.65 5,948.88 MWD(4) 13,187.26 89.32 16297 5,897.16 5,775.17 -5,984.20 -7,446.96 5,963,89992 491,497.56 3.42 5,984.20 MWD(4) 13,210.81 88.65 162.77 5,897.58 5,775.58 -6,006.71 -7,440.02 5,963,877.42 491,504.50 2.97 6,006.71 MWD (4) 13,241.20 8843 161.71 5,898.36 5,776.36 -6,03564 -7,430.76 5,963,84849 491,513.76 3.56 6,035.64 MWD(4) 13,271,34 85.17 160.33 5,900.04 5,778.04 -6,064.09 -7,420.97 5,963,820.04 491,523.54 11.74 6,064.09 MWD (4) 13,301.92 8591 160.44 5,902.42 5,780.42 -6,092.81 -7,410.74 5,963,791.32 491,533.77 2.45 6,092.81 MM (4) 13,330.83 86.99 165.03 5,904.21 5,782.21 -6,120.35 -7,402.18 5,963,763.78 491,542.32 16.28 6,120.35 MWD (4) 13,361.33 85.52 168.01 5,906 20 5,784.20 -6,149.95 -7,395.08 5,963,734.19 491,54941 10.88 6,149.95 MWD (4) 13,391.32 85.64 170.33 5,90.51 5,786.51 -6,179.31 -7,38946 5,963,704.82 491,55503 7.72 6,179.31 MWD (4) 121282018 6.'46:30PM Page 5 COMPASS 51100.14 Build 850 ConocoPhillips Map Company: ConocoPhillips (Alaska) Inc. Northing Project: Kuparuk River Unit (ft) (°1100') Site: Kuparuk 2T Pad -6,208.38 -7.385.33 Well: 2T-37 -7,382.45 5,963,645.66 Wellbore: 2T-37 5,963,615.92 -6,299.28 Design: 2T-37 -6,328.73 -7,378.21 Survey � -6,353.45 .--.e... .-.. MD Inc Azi TVD TVDSS (usft) V) (1) (usft) (usft) 13,420.76 86.41 17347 5,910.55 5,788.55 13,451.03 88.13 175.62 5,912.00 5,790.00 13,480.85 90.55 176.70 5,912.34 5,790.34 13,511.94 92.09 177.94 5,9M62 5,78962 13,541.44 93.38 178.98 5,91021 5,788.21 13,566.20 92.83 181.26 5,908.87 5,78687 13,601.00 92.83 181.26 5,907.16 5,785.16 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 2T-37 2T-37 @ 122.00usft (Parker 245) 2T-37 @ 122.00usft (Parker 245) True Minimum Curvature EDT 14 Alaska Production Map Map +Nl-S +El -W Northing (usft) (usft) (ft) (°1100') (ft) (ft) -6,208.38 -7.385.33 5,963,675]5 -6,238.48 -7,382.45 5,963,645.66 -6,268.23 -7,380.6 5,963,615.92 -6,299.28 -7,379.00 5,963,584.87 -6,328.73 -7,378.21 5,963,555.42 -6,353.45 -7,378.26 5,963,530.70 -6,388.20 -7,379.03 5,963,495.96 Well 2T-37 2T-37 @ 122.00usft (Parker 245) 2T-37 @ 122.00usft (Parker 245) True Minimum Curvature EDT 14 Alaska Production Map Vertical Easting DLS Section Survey Tool Name (ft) (°1100') (ft) 491,559.16 10.96 6,208.38 MWD (4) 491,562.03 9.09 6,238.48 MWD(4) 491,564.02 8.89 6,268.23 MWD(4) 491,565.47 6.35 6,299.28 MWD(4) 491,566.26 5.61 6,328.73 MWD (4) 491,566.20 9.46 6,35345 MWD(4) 491,565.43 0.00 6,388.20 PROJECTED to TD Annotation 6A (ER UGHES 12/28/2018 6:46:30PM Pape 6 COMPASS 5000.14 Build 85D 2 1 � 1 1 V 30186 BA_ KER PRINT DISTRIBUTION LIST 11GHES a GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 2T -37L1 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider(a2bakerhuehes.com e sign and return one copy of this transmittal form to: IcoPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) 3 Street. forage, Alaska 99510 LOG TYPE GR- I LOG DATE December 11, 2018 TODAYS DATE January 2, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FED" WILL WTDELIVER TO P.O. BOX) PERSON ATTENTION V 1 RP North Slope. EOA, PBOC. PRB-20 (Office 109) D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 FIELD I FINAL CD/DVD FINAL PRELIMLOGS 0 (las, dlis, PDF, META, I SURVEY I REPORT LOGS 0 CGM, Final Surveys) (Compass) # OF PRIN ur MIN # OF COPIES # OF COPIES I# OF COPIES 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC Attn: Natural Resources Technician If 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential' on all material dive 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 1 0 0 0 1 3 0 0 0 0 0 0 0 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC Attn: Natural Resources Technician If 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 ** Stamp "confidential' on all material dive 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 1 0 0 0 1 3 0 0 THE STATE °fALASKA GOVERNOR BILL WALKER James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. P.O Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 2T -37L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-119 Surface Location: 98' FNL, 556' FWL, SEC. 12, TI IN, R8E, UM Bottomhole Location: 1207' FNL, 1558' FEL, SEC, 15, TI IN, R8E, UM Dear Mr. Ohlinger: 333 West 7th Avenue Anchorage, Alaska 99501 Main: 907.297.1433 Fax: 907.276.7542 www.aogcc.claska.gov Enclosed is the approved application for the permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 195-101, API No. 50-103-20227-00- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair b: DATED this t day of October, 2018. STATE OF ALASKA i ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 RECEIVED r ') Ti 1a. Type of Work: Drill ❑ Lateral ❑✓ Reddll ❑ Reentry ❑ 11b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ Stratigraphic Test ❑ Development - Oil 'Service - Winj ❑ Single Zone E , Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ 1 c. Spticify if well is proposed for: Coalbed Gas ❑ Gas Hydrates ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Bond: Blanket Q , Single Well ❑ Bond No. 5952180. 11. Well Name and Number: KRU 2T -37L1 - 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 6. Proposed Depth: MD: 13600' TVD: 5907' 12. Field/Pool(s): Kuparuk River Pool / Kuparuk River Oil Pool 4a. Location of Well (Governmental Section): Surface: 98' FNL, 556' FWL, Seo 12, Tl lN, R8E, UM • Top of Productive Horizon: 3738' FNL, 1571' FEL, Sec 10, T11 N, R8E, UM Total Depth: 1207' FNL, 1558' FEL, Sec 15, T11 N, R8E, UM 7. Property Designation: D�- ��� ADL 25568. 8. DNR Approva umber: 4 _ / LONS 84-133 13. Approximate Spud Dale: 11/5/2018 9. Acres in Property: 2560 14. Distance to Nearest Property: 3900' 4b. Location of Well (State Base Plane Coordinates - NAD 27): Surface: x- 498945 - y- 5969882 • Zone- 4 10. KB Elevation above MSL (ft): 122' GL / BF Elevation above MSL (ft): 81' 15. Distance to Nearest Well Open to Same Pool: 265', 2A-17 16. Deviated wells: Kickoff depth: 10720' feet , Maximum Hole Angle: 93 degrees 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Downhole: 3392 - Surface: 2808 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 2800' 10800' 5874' 13600' • 5907' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (it): Effect. Depth TVD (ft): Junk (measured): 11080' 6067' N/A 10984' 6006' 10982' Casing Length Size Cement Volume MD TVD Conductor/Structural 80' 16" 103 sx ASI 121' 121' Surface 4104' 9-5/8" 860 sx ASI I I, 400 sx G, 240 sx ASI 4145' 2890' Production 11035' 7" 240 sx Class G 11074' 6066' Perforation Depth MD (ft): 10675'-1069L8' Perforation Depth TVD (ft): 581 V- 5826' 10720'- 10740' 5839'- 5852' Hydraulic Fracture planned? Yes❑ No ❑4 ' 20. Attachments: Property Plat ❑ BOP katch Divertt'r Sketch illing Program DSeabed Report B Shallow Hazard Analysis Dri li geFluid Prog ay. Depthtm a 20 AAC 25.050 requ ot ementse✓ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Keith Herring Authorized Name: James Ohlinger Contact Email: K(ith. E.Her In Co .Com Authorized Title: Staff CTD Engineer Contact Phone: 907-263-4321 Authorized Signature: Date: �Q 8 Commission Use Only Permit to DrillLC p Number: /&/ API Number:r/�� !� 50-/(j-,)-- Permit Approval Pat,. W12-111 See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed urethan gas hydrates, or gas contained in shales: Other: drj6P /.��,f. �-O ,350 �J S / Samples req'd: Yes ❑ No� Mud log req'd: Yes [:]/No C/ r7�'I Y1 t n5 HzS measures: Yes [�No❑ Directional svy req'd: Yes o ❑ PrfV « i tt � ���/ 7 O '7S�OSpa icis ngexception req'd: Yes ❑ No(� Inclination -only svy req'd: Yes ❑ No [/ Post initial injection MIT req'd: Yes ❑ No [- APPROVED BY t tZ ( Approved by: lt COMMISSIONER THE COMMISSION Date: _ ^ 1r} Form 10-401 Revised(o � ry This permit is valid f ^ n f /1 j a`fr/y tNA o Submit Fore and approval per 20 AAC 25.00 (g) Anachmenis in Duplicate ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 October 04, 2018 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill two laterals out of the KRU 2T-37 (PTD# 195-101) using the coiled tubing drilling rig, Nabors CDR3-AC. . CTD operations are scheduled to begin in early November 2018. The objective will be to drill two laterals KRU 2T-371_1 and 2T -37L1-01 targeting the Kuparuk A -sand interval. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 E — AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 2T-371_1 and 2T-371-1-01 - Detailed Summary of Operations - Directional Plans for 2T-371_1 and 2T-371-1-01 - Current wellbore schematic - Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-2634321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 2T -37L1 and 2T -37L1-01 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................................. 2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3))................................................................................................................................................. 2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 7. Diverter System Information ..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))......................._.............,.................................._.......,............................... _............................4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................5 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))......................................................................................................................................................6 16. Attachments....................................................................................................................................6 Attachment 1: Directional Plans for 2T -37L1 and 2T-371-1-01 laterals............................................................................6 Attachment 2: Current Well Schematic for 2T-37............................................................................................................6 Attachment 3: Proposed Well Schematic for 2T-371-1 and 2T-371-1-01 laterals..............................................................6 Page 1 of 6 October 04, 2018 PTD Application: 2T -37L1 & 2T -37L1-01 1. Well Name and Classification (Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b)) The proposed laterals described in this document are 2T-371_1 and 2T-371-1-01. The laterals will be classified as "Development -Oil" wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A ;and package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 2T-371_1 and 2T-371-1-01. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. - Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the maximum formation pressure in the area of 3,392 psi in 2A-23 (i.e. 11.3 ppg EMW), the maximum potential surface pressure in 2T-37, assuming a gas gradient of 0.1 psi/ft, would be 2,808 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. - The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 2T-37 was measured to be 2,670 psi (8.9 ppg EMW) on 7/16/2018. The maximum downhole pressure in the 2T-37 vicinity is the 2A-23 at 3,392 psi (11.3 ppg EMW) measured on 3/15/2013. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) s The offset injection wells to 2T-37 have injected gas, so there is a possibility of encountering free gas while drilling the 2T-37 laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 2T-37 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 2T-37 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 October 04, 2018 PTD Application: 2T-371_1 & 2T-371-1-01 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 16" 62.5 H40 Welded 0' 2-3/8", 4.7#, L-80, ST -L slotted liner; • 2T-371_1 10,800' 13,600' 5,752' 5,785' aluminum billet on to 40.0 L-80 BTC 0' 4145' 2-3/8", 4.7#1 L-80, ST -L slotted liner; 2T -37L1-01 10,620' 14,900' 5,655' 5,759' with deployment sleeve on to Existing Casing/Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psipsi Collapse Conductor 16" 62.5 H40 Welded 0' 121' 0' 121' 1640 670 Surface 9-5/8" 40.0 L-80 BTC 0' 4145' 0' 2890' 5750 3090 Production 7" 26.0 L-80 BTC MOD 0' 11074'• 0' 6066' 7240 5410 Tubing 3-1/2" 9.3 L-80 ABM ELIE 0' 10626' 0' 5780' 10160 10540 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based PowerVis mud (8.6 ppg) " Drilling operations: Chloride -based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices ✓ described below. Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and shale stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 2T-37 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Page 3 of 6 October 04, 2018 PTD Application: 2T-371_1 & 2T-371-1-01 Pressure at the 2T-37 Window 10720' MD, 5840' TVD Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 2T-37 is a Kuparuk A -Sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize two laterals to target the A -sands to the south and west of 2T-37. The laterals will recover resource to the south that has been hydraulically suppressed and recover production to the west from the long-term shut-in producer 2T -38A. CDR3-AC will set a mechanical whipstock (High Expansion Wedge) inside the 7" casing at the planned kick off point of 10,720' MD. The 2T -37L1 lateral will exit through the 7" casing at 10,720' MD and TD at 13,600' MD, targeting the A sand to the south. It will be completed with 2-3/8" slotted liner from TD up to 10,800' MD with an aluminum billet for kicking off the 2T -37L]-01 lateral. The 2T -37L1-01 lateral will drill to a TD of 14,900' MD targeting the A sand to the west. It will be completed with 2-3/8" slotted liner from TD up into the 3-1/2" tubing at 10,620' MD with a deployment sleeve. Pre -CTD Work 1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP. 2. RU Service Coil: Mill out "D" nipple and conduct FCO 3. Prep site for Nabors CDR3-AC rig. Page 4 of 6 October 04, 2018 Pumps On 1.8 bpm) Pumps Off A -sand Formation Pressure 8.8 2670 psi 2670 psi Mud Hydrostatic 8.6 2612 psi 2612 psi Annular friction i.e. ECD, 0.08psi/ft) 857 psi 0 psi Mud + ECD Combined no chokepressure) 3469 psi Overbalanced —799psi) 2612 psi Underbalanced —58psi) Target BHP at Window 11.8 3445 psi 3445 psi Choke Pressure Required to Maintain Target BHP 0 psi 833 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 2T-37 is a Kuparuk A -Sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize two laterals to target the A -sands to the south and west of 2T-37. The laterals will recover resource to the south that has been hydraulically suppressed and recover production to the west from the long-term shut-in producer 2T -38A. CDR3-AC will set a mechanical whipstock (High Expansion Wedge) inside the 7" casing at the planned kick off point of 10,720' MD. The 2T -37L1 lateral will exit through the 7" casing at 10,720' MD and TD at 13,600' MD, targeting the A sand to the south. It will be completed with 2-3/8" slotted liner from TD up to 10,800' MD with an aluminum billet for kicking off the 2T -37L]-01 lateral. The 2T -37L1-01 lateral will drill to a TD of 14,900' MD targeting the A sand to the west. It will be completed with 2-3/8" slotted liner from TD up into the 3-1/2" tubing at 10,620' MD with a deployment sleeve. Pre -CTD Work 1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP. 2. RU Service Coil: Mill out "D" nipple and conduct FCO 3. Prep site for Nabors CDR3-AC rig. Page 4 of 6 October 04, 2018 PTD AnDlication: 2T-371_1 & 2T-371-1-01 Ria Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 2. 2T -37L 1 Lateral (A3 sand - South) a. Set top of high expansion wedge at 10,720' MD. b. Mill 2.80" window at 10,720' MD. c. Drill 3" bi-center lateral to TD of 13,600' MD. d. Run 2-3/8" slotted liner with aluminum billet from TD up to 10,800' MD. 3. 2T -37L1-01 Lateral (A3 sand - West) a. Kick off of the aluminum billet at 10,800' MD. b. Drill 3" bi-center lateral to TD of 14,900' MD. c. Run 2-3/8" slotted liner with deployment sleeve from TD up to 10,620' MD. 4. Obtain SBHP, freeze protect, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Return well to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. - Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA un -deployment, the steps listed above are observed, only in reverse. Liner Running - The 2T-37 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. Page 5 of 6 October 04, 2018 PTD Application: 2T-371-1 & 2T -37L1-01 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.05O(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. ✓ - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Dr50 2T-371-1 2T -37L1-01 - Distance to Nearest Well within Pool Lateral Name Distance Welt 2T-371-7 265' 2A-17 2T-371-1-01 120' 2T-38 16. Attachments Attachment 1: Directional Plans for2T-37L1 and 2T -37L1-01 laterals Attachment 2: Current Well Schematic for 2T-37 Attachment 3: Proposed Well Schematic for 2T -37L1 and 2T -37L1-01 laterals Page 6 of 6 October 04, 2018 ConocoPhillips _ConocoPhillips Export Company Kuparuk River Unit Kuparuk 2T Pad 2T-37 2T -37L1 Plan: 2T-37L1_wp03 Standard Planning Report 03 October, 2018 BT�a GHES GE company ConocoPhillip5 Database: OAKEDMPI Company: _ConocoPhillips Export Company Project: Kuparuk River Unit Site: Kuparuk 2T Pad Well: 2T-37 Wellbore: 2T-3711 Design: 2T-37L7_wp03 Baker HugheslNTEQ BA ER Planning Report BAT .GE.pany Local Co-ordinate Reference: Well 2T-37 TVD Reference: Mean Sea Level MD Reference: 2T-37 Cal 122.00usft (Parker 245) North Reference: True ' Survey Calculation Method: Minimum Curvature 'roject Kuparuk River Unit, North Slope Alaska, United States map System: US State Plane 1927 (Exact solution) • System Datum: Mean Sea Level ;so Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor ifte Kupamk 2T Pad PLAN Tie On Depth: Measured site Position: Northing: 5,970,382.43 usft Latitude: 70'19'49.1291 'rom: Map Easting: 498,944.93usft Longitude: 150' 0'30.807 V lasition Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: -0.01 ° Well 2T-37 PLAN Tie On Depth: Measured Depth From (TVD) Well Position +N/ -S 0.00 usft Northing: 5,969,882.48 usft • Latitude: 70' 19'44.211 N +EI -W 0.00 usft Easting: 498,944.62 usft ' Longitude: 150° 0'30.814 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: • 80.50 usft Wellbore 2T-3711 Magnetics Model Name Sample Date BGGM2018 12/1/2018 Design 2T-3711_wp03 Audit Notes: Version: Vertical Section: Plan Sections PLAN Tie On Depth: Measured Depth From (TVD) -NI-S Depth Inclination Azimuth (usft) (°) (°) 10,649.52 51.20 241.98 10,720.00 50.84 242.15 10,749.00 58.09 242.15 10,819.91 90.00 242.15 10,900.00 92.94 206.21 11,100.00 92.37 192.21 11,200.00 87.42 187.26 11,600.00 87.72 159.24 11,850.00 87.82 176.75 12,050.00 89.10 190.70 12,450.00 89.67 162.70 12,800.00 89.70 187.20 13,200.00 89.74 159.20 13,600.00 89.77 187.20 Declination (°) Dip Angle Field Strength 1°) (nil 16.75 80.85 57,427 Phase: PLAN Tie On Depth: 10,649.52 Depth From (TVD) -NI-S +EI -W Direction (usft( (usft) (usft) (°) -80.50 0.00 0.00 180.00 TVD Below System +NI•S +EI -W (usft) (usft) (usft) 5,673+24 -3,610.86 -7,355.57 5,717.58 -3,636.53 -7,403.98 5,734.42 -3,647.55 -7,424.83 5,753.66 -3,678.99 -7,484.33 5,751.54 -3,735.45 -7,539.23 5,742.23 -3,923.64 -7,604.80 5,742.42 -4,022.13 -7,621.70 5,759.74 -4,415.04 -7,575.18 5,769.54 -4,658.44 -7,523.42 5,774.94 -4,857.44 -7,536.38 5,779.33 -5,252.79 -7,513.57 5,781.27 -5,598.78 -7,483.01 5,783.28 -5,992.02 -7,436.13 5,785.05 -6,385.27 -7,389.25 Dogleg Build Tum Rate Rate Rate (•/toGusR) ('1100usft) ('Mo0usft) 0.00 0.00 0.00 0.54 -0.51 0.24 25.00 25.00 0.00 45.00 45.00 0.00 45.00 3.67 -44.87 7.00 -0.29 -7.00 7.00 4.95 -4.95 7.00 0.08 -7.01 7.00 0.04 7.01 7.00 0.64 6.97 7.00 0.14 -7.00 7.00 0.01 7.00 7.00 0.01 -7.00 7.00 0.01 7.00 TFO t°) 0.00 159.90 0.00 0.00 275.00 268.00 225.00 270.00 90.00 85.00 271.00 90.00 270.00 90.00 Target IaW018 12:06:03PM Page 2 COMPASS 5000.14 Build 85 Baker Hughes INTEQ BA (ER ConocoPhillips Planning Report UGHES a GEc.,,,ny Database: OAKEDMPI Local Coordinate Reference: Well 2T-37 Company: _ConowPhillips Export Company TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 2T-37 @ 122,00usft (Parker 245) Site: Kuparuk 2T Pad North Reference: True Well: 2T-37 Survey Calculation Method: Minimum Curvature Wellbore: 2T-371-1 Design: 2T-3711_wp03 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth (usft) Inclination Azimuth PI V) System (usft) +NIS (usft) +E/ -W (usft) Section (usft) Rate (`1100usft) Azimuth (•) Northing (usft) Easting (usft) 10,649.52 51.20 241.98 5,673.24 -3,610.86 -7,355.57 3,610.86 0.00 0.00 5,966,273.01 491,589.28 TIP 10,700.00 50.94 242.10 5,704.96 -3,629.27 -7,390.26 3,629.27 0.54 159.90 5,966,254.61 491,554.59 10,720.00 50.84 242.15 5,717.58 -3,636.53 -7,403.98 3,636.53 0.54 159.82 5,966,247.36 491,540.87 KOP 10,749.00 58.09 242.15 5,734.42 -3,647.55 -7,424.83 3,647.55 25.00 0.00 5,966,236.34 491,520.02 End 26 dis, Start 45 dis 10,800.00 8104 242.15 5,752.11 -3,669.72 -7,466.80 3,669.72 45.00 0.00 5,966,214.17 491,478.05 10,819.91 90.00 242.15 5,753.66 -3,678.99 -7,484.33 3,678.99 45.00 0.00 5,966,204.91 491,460.52 4 10,900.00 92.94 206.21 5,751.54 -3,735.45 -7,539.23 3,735.45 45.00 -85.00 5,966,148.47 491,405.62 End 45 dis, Start 7 dis 11,000.00 92.67 199.21 5,746.63 -3,827.52 -7,577.77 3,827.52 7.00 -92.00 5,966,056.40 491,367.07 11,100.00 92.37 192.21 5,742.23 -3,923.64 -7,604.80 3,923.64 7.00 -92.34 5,965,960.31 491,340.03 6 11,200.00 87.42 187.26 5,742.42 4,022.13 -7,621.70 4,022.13 7.00 -135.00 5,965,861.82 491,323.12 7 11,300.00 87.44 180.25 5,746.92 4,121.76 -7,628.24 4,121.76 7.00 -90.00 5,965,762.21 491,316.56 11,400.00 87.49 173.25 5,751.35 4,221.43 -7,622.58 4,221.43 7.00 -89.68 5,965,662.54 491,322.21 11,500.00 87.59 166.24 5,755.64 4,319.69 -7,604.81 4,319.69 7.00 -89.37 5,965,564.30 491,339.97 11,600.00 87.72 159.24 5,759.74 4,415.04 -7,575.18 4,415.04 7.00 -89.07 5,965,468.94 491,369.58 8 11,700.00 87.74 166.24 5,763.71 4,510.40 -7,545.55 4,510.40 7.00 90.00 5,965,373.59 491,399.19 11,800.00 87.79 173.25 5,767.63 4,608.67 -7,527.77 4,608.67 7.00 89.72 5,965,275.33 491,416.95 11,850.00 87.82 176.75 5,769.54 -4,658.44 -7,523.42 4,658.44 7.00 89.45 5,965,225.57 491,421.30 9 11,900.00 88.13 180.24 5,771.31 4,708.38 -7,522.10 4,708.38 7.00 85.00 5,965,175.63 491,422.61 12,000.00 88.77 187.21 5,774.01 4,808.07 -7,528.60 4,808.07 7.00 84.88 5,965,075.95 491,416.10 12,050.00 89.10 190.70 5,774.94 4,857.44 -7,536.38 4,857.44 7.00 84.69 5,965,026.58 491,408.31 10 12,100.00 89.16 187.20 5,775.70 -4,906.82 -7,544.15 4,906.82 7.00 -89.00 5,964,977.21 491,400.53 12,200.00 89.29 180.20 5,777.05 -5,006.54 -7,550.60 5,006.54 7.00 -88.95 5,964,877.50 491,394.08 12,300.00 89.44 173.20 5,778.16 -5,106.31 -7,544.84 5,106.31 7.00 -88.85 5,964,777.74 491,399.82 12,400.00 89.59 166.20 5,779.01 -5,204.63 -7,526.97 5,204.63 7.00 -88.77 5,964,679.43 491,417.67 12,450.00 89.67 162.70 5,779.33 -5,252.79 -7,513.57 5,252.79 7.00 -88.72 5,964,631.27 491,431.06 11 12,500.00 89.67 166.20 5,779.62 -5,300.96 -7,500.17 5,300.96 7.00 90.00 5,964,583.11 491,444.45 12,600.00 89.68 173.20 5,780.18 -5,399.28 -7,482.31 5,399.28 7.00 89.98 5,964,484.79 491,462.30 12,700.00 89.69 180.20 5,780.74 -5,499.05 -7,476.56 5,499.05 7.00 89.94 5,964,385.03 491,468.04 12,800.00 89.70 187.20 5,781.27 -5,598.78 -7,483.01 5,598.78 7.00 89.90 5,964,285.31 491,461.57 12 12,900.00 89.70 180.20 5,781.79 -5,698.51 -7,489.46 5,696.51 7.00 -90.00 5,964,185.60 491,455.11 13,000.00 89.71 173.20 5,782.31 -5,798.28 -7,483.71 5,798.28 7.00 -89.96 5,964,085.83 491,460.84 13,100.00 89.72 166.20 5,782.80 -5,896.61 -7,465.85 5,896.61 7.00 -89.93 5,963,987.51 491,478.69 13,200.00 89.74 159.20 5,783.28 -5,992.02 -7,436.13 5,992.02 7.00 -89.89 5,963,892.10 491,508.39 13 13,300.00 89.74 166.20 5,783.74 -6,087.44 -7,406.42 6,087.44 7.00 90.00 5,963,796.69 491,538.09 13,400.00 89.74 173.20 5,784.19 -6,185.77 -7,388.55 6,185.77 7.00 89.97 5,963,698.37 491,555.94 13,500.00 89.75 180.20 5,784.63 -6,285.54 -7,382.80 6,285.54 7.00 89.94 5,963,598.61 491,561.67 13,600.00 89.77 187.20 5,785.05 • -6,385.27 -7,389.25 6,385.27 7.00 89.91 5,963,498.89 491,555.21 Planned TD at 13600.00 10/32018 12: 06 03P Page 3 COMPASS 5000.14 Build 85 ConocoPhillips Vertical Database: OAKEDMPI Depth Company: _ConomPhillips Export Company Project: Kuparuk River Unit (usft) Site: Kuparuk 2T Pad (usft) Well: 2T-37 5673,24 Wellbore: 2T-371-1 TIP Design: 2T-37L7_wp03 -3,636.53 -7,403.98 KOP 10,749.00 Casing Points -3,647.55 -7,424.83 End 25 dls, Start 45 dls Measured Vertical -3,678.99 Depth Depth 10,900.00 (usft) (usft) -7,539.23 13.600.00 5.765.05 2 3/8" Plan Annotations Baker HugheslNTEQ Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Name Measured Vertical Local Coordinates Diameter Depth Depth -N/-S +E/ -W (usft) (usft) (usft) (usft) Comment 10,649.52 5673,24 -3,610.86 -7,355.57 TIP 10,720.00 5,717.58 -3,636.53 -7,403.98 KOP 10,749.00 5,734.42 -3,647.55 -7,424.83 End 25 dls, Start 45 dls 10,819.91 5,753.66 -3,678.99 -7,484.33 4 10,900.00 5,751.54 -3,735.45 -7,539.23 End 45 dls, Start 7 cis 11,100.00 5,742.23 -3,923.64 -7,604.80 6 11,200.00 5,742.42 -4,022.13 -7,621.70 7 11,600.00 5,759.74 -4,415.04 -7,575.18 8 11,850.00 5,769.54 -4,658.44 -7,523.42 9 12,050.00 5,774.94 -4,857.44 -7,536.38 10 12,450.00 5,779.33 -5,252.79 -7,513.57 11 12,800.00 5,781.27 -5,598.78 -7,483.01 12 13,200.00 5,783.28 -5,992.02 -7,436.13 13 13,600.00 5,785.05 -6,385.27 -7,389.25 Planned TD at 13600.00 UGHES a GEcomp r,y Well 2T-37 Mean Sea Level 2T-37 @ 122.00usft (Parker 245) True Minimum Curvature Casing Hole Diameter Diameter (in) (in) 2.375 3 000 10/32018 12: 06: 03PM Page 4 COMPASS 5000.14 Build 85 ConocoPhillips Bq ER ConocoPhillips Travelling Cylinder Report F�UGHES aGEcompany Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Reference Site: Kuparuk 2T Pad Site Error: 0.00 usft Reference Well: 2T-37 Well Error: 0.00 usft Reference Wellbare 2T-3717 Reference Design: 2T-37L1_wp03 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 2T-37 2T-37 Q 122,00usft (Parker 245) 2T-37 Q 122.00usft (Parker 245) True Minimum Curvature 1.00 sigma EDT 14 Alaska Production Offset Datum Reference 2T-37L1_wp03 Casing Filter type: GLOBAL FILTER APPLIED: All welipaths within 200'+ 100/1000 of reference Diameter Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 10,649.52 to 13,600.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,555.85 usft Error Surface: Pedal Curve Survey Tool Program From (usft) 50.00 4,068.86 10,649.52 Casing Points Date 9/28/2018 Vertical Casing To Depth Diameter (usft) Survey (Wellbore) Tool Name Description 3,739.00 2T-37 GyroData (2T-37) Copy of GYD-CT-CMS Gyrodala cont.casing m/s 10,649.52 2T-37 (2T-37) MWD MWD - Standard 13,600.00 2T-371-1_wp03(2T-371-1) MWD MWD -Standard Measured Vertical Casing Depth Depth Diameter (usft) (usft) Name (in) 4,145.00 2,889.54 95/8" 9.625 13,600.00 5,907.05 23/8" 2.375 Hole Diameter (in) 12.250 3.000 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Kupamk 2T Pad 2T -21 -2T -21-2T-21 11,091.02 10,850.00 841.36 302.90 590.47 Pass - Major Risk 2T-36 - 2T-36 - 2T-36 Out of range 2T -37 -2T -37-2T-37 10,956.03 11,075.00 214.53 21.36 205.39 Pass - Major Risk 2T-37-2T-371-1-01-2T-371-1-Ot_wp03 10,809.98 10,810.00 0.47 23.47 0.24 Pass - Minor 1/10 2T-38 - 2T-38 - 2T-38 Out of range 2T-38 - 2T -38A - 2T -38A Out of range Offset Design Kuparuk 2T Pad -2T -21 -2T -21-2T-21 oesetafte Ems: eoouss Surrey Program: 50-Copyof GYO-CT43MS. 5611 -GCT -MS Rule Assigned: Major Risk orientating. Dat, Man Reference W. Semi Major Axis Measured vadloin Masthead vertical Reference Onset T.Mo.+ onset wanton, Centre Casing- Cernre to NOG, Allows to Naming Depth Depth Depth Death Aztmulh +sij3 �-W We aim canna Distance Deviation (heft) Want (ush) (haft) them halt) (°I inert) than) (in) there lure) (haft) 10,969.36 5,870.09 105500 5061.51 9373 44.82 -140.49 -3665,71 -7,80044 5000 852.96 333.99 635.97 Pass - Major Risk 1098126 5,889.52 10.575.00 5070.22 93.61 4498 -140.12 -3.675.51 -7,821.73 5.000 849.23 331.09 629.05 Pass - Major Risk 10,992.82 5.068.97 10,600.00 5,070.91 93.88 45.14 -139.69 -3,685.33 -7,843.01 5.000 846.02 328.22 622.67 Pass - Major Risk 11,004.06 5,868.45 10,625.00 5,087.61 93.96 45.29 -139.22 -3.695.14 4,864.30 5.000 843.30 325140 616.93 Pass - Major Risk 11.014.99 5,867.94 10.650.00 509891 94.02 45.45 -138.70 -3,704.95 .7,885.59 5.000 841.12 322.62 611.57 Pas - Major Risk 11,025.61 5.867.48 10.675.00 5.104.97 94.09 45.61 -138.14 -3,714]6 -7.908.88 5.000 839.52 318.88 606.97 Pass - Major Risk 11,035.94 5,866.99 10,700.00 SM&M 94.16 45.77 -137.54 -3.724.58 -7.928.21 5.000 830.52 317.18 603.06 Pass - Major Risk 11,05.00 5,866.37 10,725.00 5,122.21 94.24 45.93 -137.21 -3,734.37 -7,949.53 5.000 838.07 313.33 599.01 Pass - Major Risk 11,055.63 586612 10,750.00 5.131.15 94.29 48.09 -138.23 -3,744.03 -7,970.78 5.000 837.89 311.98 596.86 Pass - Major Pat, CC 11.064.87 5.865172 10,775.00 5,140.50 94.33 46.25 -135.50 -3,753.51 -7.991.94 5.000 07.95 309.48 594.26 Pass - Major Risk 11,073.81 5.865.33 10,800.00 5,149.99 94.28 46.41 -134.73 -5762.83 -8.013.07 5.000 538.45 307.09 59222 Pass - Major Risk CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 8282018 5:48:51PM Page 2 COMPASS 5000.14 Build 85 ConocoPhillips Project: Kuparuk River Unit Site: Kuparuk 2T Pad A= -m 7:- n.oxwn-is'rs ueaaebo Fkk WELL80RE OETARS'. 2T-3]Li REFERENCE NFORIATI0x Par¢M Wellbore : 2T-37 coo Jmz (M) Rderznm: W 2TaT.Tme xmN Well: 2T-37 sremm saa.Tsn Te on MO: 10649.52 vemul(ND)Rekrznce: wenSrolwd Wellbore: 2T-371-1 py Mqk-mes• Longitude Be (vs)aelerzree: sm pmx,0W9 Plan: 2T-371.1_wp03(2T-37/2T-371-1) u,nd°ecceumi 70° W..A Der Ra :2Tai@t22.aa A(ft r2u) N 150" 0'30.814 W Sec MD Inc CN w6lm keP No. Conlure B VGHERI a GE.pmry WELL DETAILS. 2T-37 +N/ -S +EI -W Northing Easling Latitude Longitude 0.00 0.00 5969882.48 498944.62 70° 19'44.211 N 150" 0'30.814 W Sec MD Inc Azi TVDSS +N/ -S +E/ -W Oleg TFace VSect Annotation 1 10649.52 51.20 241.98 5673.24 -3610.86 -7355.57 0.00 0.00 3610.86 TIP 2 10720.00 50.84 242.15 5717.58 -3636.53 -7403.98 0.54 159.90 3636.53 KOP 3 10749.00 58.09 242.15 5734.42 -3647.55 -7424.83 25.00 0.00 3647.55 End 25 Ells, Start 45 dls 4 10819.91 90.00 242.15 5753.66 .4678.99 -7484.33 45.00 0.00 367$99 4 5 10900.00 92.94 206.21 5751.54 -3735.45 -7539.23 45.00 275.00 3735.45 End 45 d1s, Start 7 Ells 6 11100.00 92.37 192.21 5742.23 -3923.64 -7604.80 7.00 268.00 3923.64 6 7 11200.00 87.42 187.26 5742.42 -4022.13 -7621.70 7.00 225.00 4022.13 7 8 11600.00 87.72 159.24 5759.74 -0415.04 -7575.18 7.00 270.00 4415.04 8 9 11850.00 87.82 176.75 5769.54 -0658.44 -7523.42 7.00 90.00 4658.44 9 10 12050.00 89.10 190.70 5774.94 -4857.44 -7536.38 7.00 85.00 4857.44 10 11 12450.00 89.67 162.70 5779.33 -5252.79 -7513.57 7.00 271.00 5252.79 11 12 12800.00 89.70 167.20 5781.27 -5598.78 -7483.01 7.00 90.00 5598.78 12 13 13200.00 89.74 159.20 5783.28 -5992.02 -7436.13 7.00 270.00 5992.02 13 14 13600.00 89.77 187.20 5785.05 -6385.27 -7389,25 7.00 90.00 6385.27 Planned TD at 13600.00 B VGHERI a GE.pmry West( -)/East(+) (400 usft/in) 110 PIP mmmmm 200 IRMO 300 EMMENE 04 WIN .■■■■EM�®■■'�1�. l' e .■■■■■■■■■■■E1111 ®�� m 5400 0Al■■0 n � OEM ■■■■■■■■��111111■■■ n . e I.■■■■■■■■■■■■,"I■N■■ m .ttt.■■■■■■■■■■■■,1,�. m F m .. t'mmw,1®121MIN 5 0 .■■■■■■■■E TW: 600 West( -)/East(+) (400 usft/in) 110 200 300 l' m 5400 n � n m m F m 5 0 TW: 600 iid 25 Ells, St n45ds 5]00 i8 5800 4 10 I2 2 3 . loon' TE at 3600. 0 5900 S 2T- 7/2 - 71,I-0 /-,712A.17 6000 2T-371-1 I Feult T-3]/ T-37 6100 2T 2137L 31 eultl 6200 e o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 0 0 0 Vertical Section at 180.000 (100 usft/in) ConocoPhillips Project: Kuparuk River Unit Site: Kuparuk 2T Patl Well: 2T-27 uimummrm. wnn =p Nwnk. tsar u.a..rw; Fcea sx.a0n�sr�2v.� WELLBORE DETAILS: 2T-31Lt BAKER Parent Wellbore: 2T-3] Tie MD: 10648.52 Loai°"ary lrv� Rearm: waII2T�z, ince rvonn vmkal llwi naarNra. zTaT@u.T'Z lazrwer 245) WellWellbow 2T-37Li ppMya:mss on SstlmrySlRelxerca.sal7lomry,oaoe) WerejUGHES saasur lcarMer z4s) �'M GEmmparry Pian: 2T-371.4_wp03(2TJ7/2T371t) wal�eoou�mi caedam uamo4: Ommuum can lure I '\ -1600 I�. -2000. I -2400 -2800; i -:200J, -3600 N O 4000, R 14400, + -� 4soo-LI o '.L11 ,i 121 :I 52001 !-}f,'ai 5600 2't' JA O 1'.- r 1i � 6000 b400� _ ri -68001 84001 L 1 1 1x1 2t� I. 1 -2TAM41 'I-Ai/i14lLl -. Akj6.]���rzwn.111) x -I 2r-IIJ±T.IYr. 1_11111 2r.1412T-14 �I �' _I_.�-ill 8800 i - � -; _a PA -11 2A11 IA -9200 — �o -15200-14800-14400-19000-UG00.13200-12800-12400-12000-11600-11200-10800-10400-I000O -9600 -P00 -8800 -8400 -6000 -7600 -020D. 1900 -6400 -6000 -5600 -52004800 -0400 4000 1600 J200 -2800 -2400 X000 West( -)/East(+) (400 usfi/in) 2T-31 @ 122.OWsft (Parker 245) AJW KUP PROD 2T-37 C0iI0C0f111ll1'JS-�-� Well Attributes Mac Angle&MD TD - At Florall WenlaaPPuuLM wellbore status wHl MDlnrce) Fc[etm EKH1 Alayca. I(IC. KUPARUK RIVER UNIT 501032022]00 PROD ].39 3,400.00 11.080.0 Cammant Xn 1ppml DNe Mnotation EnC Dace KBGM (X) flip Rtleasa0ate SSSV: NIPPLE 50 11111/2014 Las WO'. 8113/1995 2Tm, mra01e 7: o5 aF AM Last Tag Vote.. -I. (a=m,n Anmedwn EMDMa Bepminlcp Do"Moe 6y Last Tag: RKB (ESL 15' Of Fill, Leaving 5 of Open Pens) ]/6/2018 mmb r Last Rev Reason " �J Mnofellon ETH Dale List III BY Rev Reason'. Updated Tag DeplM1 )/6/2018 zembaej XRNGEk, 356 Casing trings easing 0=s=xp6oa oo (In1 101m1 Tap(I s.roeptnlnKE, sel Dapm(101 wtlLao lL.. Gmee Top Th, -m CONDUCTOR 16 1506 410 T.121.0 62.58 H-00 WELDED 7sinpD.1pllon OD (In) ID nnl Tap IXKB) Se"DepM (nN81 sn Dep"x lrvDl... wwn p... onee Tep TMeetl SURFACE 948 8.83 d1.4 d, 145.3 2,889) 40.00 L-80 BTC LOxWLTORa O¢to Gninp Dmcriplion OD pine ID(p Tap(nKBI Sel Omm"lnma) sn Dep"n(rvol...vnimp_.eraee lopThmatl PRODUCTION ] fi.28 387 11,0736 6,065.9 H.00 L -BO BTC -MOD MPpte; ope Tubing Strings Tubing Descreamn 51,ing MI..ID(ia) Top(nKBI Se10ep1n ln.. SVl Depm ITVD)(.. Wl(rvnl Graee Top LoaneChll TUBING 31/2 2.99 36.6 t0,fi25.fi 5,780.3 9.30 L-80 ABM -RUE Completion Details Nal Top LVD TopinN omin TopinrcBI (KB) f-) Item Des Lom ID len) WBLtR, 21913 36.6 36.6 0.00 HANGER FMC GEN IN TUBI NG HANGER 3.500 605.0 504.8 1.61 NIPPLE CAMEO DS LANDING NIPPLE, 2.85W NO G0 2.812 10588.3 5,]5].4 52.54 NIPPLE CAMCO W-1 SELECTIVE LANDING NIPPLE 2.812 ma,596. 5, .4 52.36 ANCHOR K ANCHOR, RUN WITH PACKER ID,597.3 5,7 .9 52.34 PACKER BAKER SAB -3 PERMANENT PACKER SEAL ATTACHED) SURFALE41, 4Aa5.3 10,613.4 S.772.8 51.99 NIPPLE CAMCO D LANDING NIPPLE. 2.]95 -NO GO 2.750 10,624.7 5.7]98 Si J4 SOS BAKER SHEAR OUT BUB ELMD TTL@10620'Eudng SWS 3.015 PERFon0926A95 GAB UFT: 5347.7 Citherin Hole (Wkreline retrievable plugs, valves, pumps, gsh, etc.) Top flv0l Tapin=I roti nrce IlKel 1.1 De: porn Rat Dam m(inl 10982.0 I 8.007.0 aU tib FISH 11, DMYon RK Latch Dropped In Rathola 9/23/1995 9/23/1995 Wa LIFT; 7.4[64 "RiorattonS&Slots an, Det Toelrv0l arm lrvDl 1•na:m Tap InKH1 Be.PKS) (Me) (nKB) LinMM2one Oaw ) Type Com 10.6750 10,698.0 5,811.2 5,825.7 C-4, T-37 WS/2001 4.0 APERF UEEZED CLOSED 1= 17 GASUrT: 9.7125 10,720.0 10,740.0 5,839.6 5,852.2 A-3, 2T.37 Saws 95 4.0 IPERF Onereed 90 deg. 270 deg. f/ lowside of hole Frac Summary SWIDOR, Ropi omignM(IN Propitiate In Formation 110) GAG LIFT, &737.3 No SUHN. I Top Depen Iitl(B) .1. RAI) Llnk toFluid System VOICkan (BLB Vol slurry(eM) - Cement Squeezes - Tap(ND) RanfIV01 Top tra.) Btm I11KB InKB) (E ) I amnDatc Gum 10,675.0 10.6900 5,811.2 wKA1.1 Ceme0150UaeZe 6/302001 C-0SAND SOUFFLE -MILLED TO 10788'W2J4' BIT Grafi LIFT: IOGo8 Mandrel Inserts m NIPPLE, 10.549) N Too(TVD)whine Type Pon SlEe TRO Run Top(pQ Run Bak Core (IIse) (nKB) M. MM OD(In) Sery Type Type (p,Q 2,199.3 2,006.3 CAMEO MMM 11 GAS LIFT LV RN 0350 1,285.0 412012004 0.2 2 5,34].] 3.401.0 CAM 0 MMM 112 GAS LIFT GLV RK .250 1394.0 drzW2004 Axf.WR: 10.5W.4 3 >.406.3 4,3067 CAMCO MMM 112 GASLIET GLV RK 0.250 1,281.0 2004 PACKER: lo,a92a 4 8,712.5 4,8555 CAMEO MMM 11 A LIFT LV RK 0.250 1,276.0 4)2012004 5 9737.3 5,3039 CAMEO MMM 112 GAS LIFT OV RK 0.188 0.0 11231199] 5 10.5428 5]30.1 CAMCO MMM 112 GAS LIFT DMY RK 0.000 0.0 -1 2010 NIPPLE,p6t3a Notes: General&Safety End ome MaamCma 2/14/2003 NOTE'. UNABLE TO GET GUNS DOWNHOLE -4140 "MAX DEPTH SOS; 10.624] 9/13/2011 NOTE'. View Scnemalicw/ Alaska Schematic90 7/2WO12 NOTE: NOT ABLE TO PULL OV AT 9737 AFTER MANY ATTEMPTS APFAF; IGM7 10MG 0S410a0UEEz5. 1SE75.0 nxe S PERF; IOMO0 10,710.0 "Ger Rohoo PRG W LTION: b.7-11,OR8 2T-37 Proposed CTD Schematic 16" 62# H-40 shoe @ 121' MD 95/8-'4 0# L-80 shoe @ 4145' MD C -sand perls SQUEEZED 10,675'- 10,698' MD A -sand perfs 10,720'- 10,740' MD 7" 26# J-55 shoe @ 11,074' MD 3-1/2" Cameo DS Nipple @ 505' RKB (2.812" ID) 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Cameo MMG gas lift mandrel at 2194', 5348', 7406', 8713', 9737', 10,543' RKB Cameo W-1 Selective Nipple @ 10,588' RKB (2.812" ID) K Anchor @ 10,596' RKB Baker SAB -3 Packer @ 10,597' RKB D -nipple at 10,613' MD (2.75" min ID, No -Go) 3-1/2" Baker SOS @ 10,625' RKB 2T -37L1 wp03 TO � 13,600' MD Liner 8itlel 10,800' MD 2T -37L1-01 Wp03 TD 14,900' MD Top of Wier @ 10,620' Mn TRANSMITTAL LETTER CHECKLIST WELL NAME: LG& PTD: Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional 1*2 FIELD: POOL: )6e/J4yct !' Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit / LATERAL No. Sr /C)l , API No. 50-&a L[»ZZ -. CjL)- j y (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements er Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL -490100 _ _ Well Name: KURUK RIV UN11-2T-a7L1 _Program DEV Well bore seg ❑d I PTD#:2181190 Company _CONQCQPHILL�S AIASKA INC Initial Class/Type DEV /PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal El Appr Date SFO 10/9/2018 Engineering 17 Nonconven. gas conforms to AS31 A5.U3UO.l.A),g.Z.A-UJ _ .... _ _ _ _ _ rvn _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ __ _ __ __ _ _ . . - . _ _ _ _ .. . 1 Permit fee attached ---- ---- ---- --------- - - NA �2 Lease number appropriate_ _ _ _ .......... _ Yes _ _ _ Surface Location lies within ADL0025569;Top Productive Interval lies in ADI -002560; . 3 Unique well name and number - _ _ _ _ _ _ ______ _ _ _ _ _ _ _ _ Yes .. TO lies in ADL0025571.- 4 Well located in. a. defined. pool_ _ _ _ - - - - - - ---- - - - - - - - --- Yes _ _ _ KUPARUK RIVER, -KUPARUK .RIV OIL -490100...... 5 Well located proper distance from drilling unit boundary . . . . . ........ . . . . Yes Kuparuk River Oil Pool, governed by Conservation Order No. 432D 6 Well located proper distance from other wells. - - - - - - - - - - - - - - - --- - - Yes Conservation Order No. 432D has no intenvell. spacing_ restrictions. Wellbore will be more than 509 7 Sufficient acreage. available indrillingunit. _ _ _ _ _ _ .. _ _ _ _ _ _ Yes from an external property line where_ ownership or landownership. changes. As proposed, well will _ 8 If. deviated, iswellboreplat. included . . . . . ...... . . . .. - _ _ _ _ Yes _ _ conform to. spacing. requirements. - 9 Operator only affected part'... _ _ ...... _ Yes 10 Operator has appropriate bond in force - - - - - - - - ------ - - - - - - .. _ _ Yes 11 Permit can be issued without conservation order... _ - - - _ Yes 12 Permit can be issued without administrative approval _ _ _ _ ..... _ _ _ Yes 13 Can permit be approved before 15 -day wait. _ _ _ _ _ _ _ _ ___ _ _ _ _ _ _ Yes 14 Well located within area and. strata authorized by Injection Order # (put 10# in. comments) (For- NA 15 All wells. within 1/4 mile area of review identified (For service well only). _ _ _ _ _ .. - - - _ NA 16 Pre -produced injector; duration of pre -production less than 3 months (For service well only) .. NA 18 Conductor string. provided - - - .. _ _ _ _ ........ . . . . . . .NA _ _ _ Conductor set. in KRU 2T-37 19 Surface casingprotectsall. known USDWS _ _ - _ _ _ _ _ NA _ _ Surface casing set in KRU 2T-37 20 CMT vol adequate.to circulataon conductor & surf csg _ _ _ _ _ _ _ ... _ NA _ _ _ _ Surface casing set and fully cemented 21 CMT vol. adequate to tie-in long string to. surf csg _ _ _ _ _ NA 22 CMT will cover all known. productive horizons_ .. _ _ _ No _ _ Productive interval will be completed with uncemented slotted liner 23 Casing designs adequate for C, T, B & permafrost. _ _ _ _ _ Yes 24 Adequate tankage or reserve pit _ _ _ _ _ .. Yes _ _ _ _ Rig has steel tanks; all waste. to approved disposal well 25 If a re -drill, has a 10-403 for abandonment been approved _ _ _ NA. 26 Adequate wellbore separation. proposed.. _ _ _ _ _ _ _ - - Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations _ _ .. _ _ NA Appr Date 28 Drilling fluid. program schematic .& equip list adequate_ ......... _ Yes _ _ Max formation pressure is3392psig(11.3 ppg.EMW); will drill w/ 8,6 ppg EMW and. maintain overbal w/ MPD - - - VTL 10/12/2018 29 BOPEs,.do they meet regulation _ _ _ _ - - _ ... _ _ Yes 30 BOPE press rating appropriate; test to (put prig in comments) _ _ . _ _ _ _ _ _ Yes MPSP is 2808 psig; will test BOPS. to 3500 psig Geology Appr Date SFD 10/9/2018 31 Choke manifold complies w/API. RP -53 (May 84) _ _ .. - - . - _ - Yes 32 Work will occur without operation shutdown_ _ _ _ _ _ _ _ _____ _ Yes X33 Is presence of 1-12S gas probable _ _ _ _ _ _ _ _____ _ _ _ _ _ _ _ _ _ _ Yes H2$ measures required- 34 Mechanical condition of wells within AOR yerified (Forservice well only) ..... _ _ _ _ _ _ _ NA _ _ _ _ ______ 35 Permit. can be Issued w/o hydrogen sulfide measures ...... _ _ _ _ . _ _ _ No. _ _ Wells _on.2T-Pad are 1 -12S -bearing. 1:12S measures required._ 36 Data. presented on potential overpressure zones _ _ - ..... - - Yes _ _ Maximum potential. reservoir pressure is 11.3 ppg_EMW;. expected reservoir pressure -is 8.9 ppg EMW, 37 Seismic analysis of shallow gas. zones. _ _ _ _ _ _ _ _ _ _ _ ... _ NA Well will be drilled using 8,0 ppg mud, a coiled -tubing rig, and managed_ pressure drilling - - 38 Seabed condition survey (if off -shore) _ _ _ _ _ _ _ _ .......... NA _ technique to control formation pressures and stabilize shale.sections. NOTE: Chance of.. - 39 Contact name/phone for weekly. progress reports [exploratory only] .. _ _ _ _ _ - NA encountering gas while drilling this wellbore due to gas injection performed in this area, Geologic Engineering Public Commissioner: Date: Co issio er: Date Commissioner �� Date lo�fz)l� G �Go-- '? co(,ZI