Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
218-136
DATA SUBMITTAL COMPLIANCE REPORT 2/25/20119r j p-103- Z 609 `7 - 72- Permit to Drill 2181360 Well Name/No. KUPARUK RIV UNIT 3H-13AL1-01 r cVl Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089.61-00 MD 10699 TVD 5954 Completion Date 11/20/2018 REQUIRED INFORMATION Mud Log No Completion Status SUSP Samples Nov� Current Status SUSP UIC No Directional Survey Yes z DATA INFORMATION List of Logs Obtained: GR/RES (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval 01-11 Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 30082 Digital Data 12/10/2018 Electronic File: 3H-13AL1-01PB1 EOW - NAD27.pdf ED C 30082 Digital Data 12/10/2018 Electronic File: 3H-13AL1-01PB1 EOW - NAD27.txt ED C 30082 Digital Data 12/10/2018 Electronic File: 3H-13AL1-01PB1 EOW - NAD83.pdf ED C 30082 Digital Data 12/10/2018 Electronic File: 3H-13AL1-01PB1 EOW - NAD83.txt Log C 30082 Log Header Scans 0 0 2181360 KUPARUK RIV UNIT 3H-13AL1-01 LOG HEADERS ED C 30114 Digital Data 7003 10699 12/13/2018 Electronic Data Set, Filename: 3H-13AL1-01PB1 GAMMA RES.Ias ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-01PB1 2MD Final.cgm ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-01PB1 5MD Final.cgm ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-0113131 5TVDSS Final.cgm ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-01PB1 2MD Final.pdf ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-01PB1 51VID Final.pdf ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-011361 5TVDSS Final.pdf ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-01PB1 EOW - NAD27.pdf ED C 30114 Digital Data 12/13/2018 Electronic File: 3H-13AL1-01PB1 EOW - NAD27.txt AOGCC Page I of 3 Monday, February 25, 2019 DATA SUBMITTAL COMPLIANCE REPORT 2/25/2019 Permit to Drill 2181360 Well Name/No. KUPARUK RIV UNIT 3H-13AL1-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089-61-00 MD 10699 TVD 5954 ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data ED C 30114 Digital Data Completion Date 11/20/2018 Log C 30114 Log Header Scans Well Cores/Samples Information: Name INFORMATION RECEIVED Completion Report 0 Production Test Information Y /9 Geologic Markers/Tops YO COMPLIANCE HISTORY Completion Date: 11/20/2018 Release Date: 10/31/2018 Interval Start Stop Directional / Inclination Data Completion Status SUSP Current Status SUSP UIC No 12/13/2018 Electronic File: 3H-13AL1-01PB1 Final Surveys 10699'TD.csv 12/13/2018 Electronic File: 3H-13AL1-01PB1 Final Surveys 106997D.xlsx 12/13/2018 Electronic File: 3H-13AL1-01PB1 Survey Listing.bd 12/13/2018 Electronic File:3H-13AL1-01PB1 Surveys.txt 12/13/2018 Electronic File: 3H-13AL1- 01 PB 1_25_tapescan_BHI_CTK.txt 12/13/2018 Electronic File: 3H-13AL1- 01 PB 1 _5_tapescan_SHI_CTK.txt 12/13/2018 Electronic File: 3H-13AL1-01PB1_output.tap 12/13/2018 Electronic File: 3H-13AL1-01PB1 2MD Final.tif 12/13/2018 Electronic File: 3H-13AL1-01PB1 5MD Final.tif 12/13/2018 Electronic File: 3H-13AL1-01PB15TVDSS Final.tif 0 0 2181360 KUPARUK RIV UNIT 31-1-13AL1-01 LOG HEADERS Sample Set Sent Received Number Comments Mechanical Integrity Test Information Y / NA Daily Operations Summary Mud Logs, Image Files, Digital Data Y /® Core Chips Y& Composite Logs, Image, Data Files© Core Photographs Y1� N�/ Cuttings Samples Y Laboratory Analyses Y (/ AOGCC Page 2 of 3 Monday, February 25, 2019 DATA SUBMITTAL COMPLIANCE REPORT 212512019 Permit to Drill 2181360 Well Name/No. KUPARUK RIV UNIT 31-1-13AL1-01 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089-61-00 MD 10699 TVD 5954 Completion Date 11/20/2018 Completion Status SUSP Description Date Comments Comments: Compliance Reviewed Current Status SUSP Date: 9/16 / I UIC No AOGCC Page 3 of 3 Monday, February 25, 2019 o x, Keck ,ro(a cesP zpP �4 t,/ 2 1 8 1 3 6 BA ER PRINT DISTRIBUTION IL ST 3 0 1 1 y UGHES a GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 3H-13AL1-01PBI FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick.Rider@bakerhughes.com ce sign and return one copy of this transmittal form to: 3coPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) G Street. ioraee. Alaska 99510 LOG TYPE GR - RES LOG DATE November 19, 2018 TODAYS DATE March 8, 2019 Revision Fixed API Number STATUS Rev 1 Replacement: CD/HCP Details: Rev. Requested by: -- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V I BP North Slope. EOA. PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. ,Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street '.Anchorage, AK 99510 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC Attn: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR -Division ofOil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alasla 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnieal Data Center, IR24 900 F Benson Blvd Anchorage, Alaska 99508 TOTALS FOR THIS PAGE FIELDIFINAL CD/DVD FINAL PRELIM (las, dlis, PDF, META, SURVEY REPORT LOGS LOGS CGM, Final Surveys) (Compass) I# # OF PRINTS # OF COPIES I# OF COPIES OF COPIES RECEIVED I AOGCC 0 lee Su � #"(151 uw 0 1 2 0 0 Per the Well Completion Report received 12/20/2018, after drilling operations reached a TD of 10,669' MD / 5954' TVD, the coiled tubing and bottom hole assembly became stuck. Attempts to free it were unsuccessful, and it was subsequently backed -off leaving the top of the fish at 7357' MD within the section of hole that the Operator currently terms "PBi". ConocoPhillips does not plan drill and complete the 3H -13A Ll -01 lateral, per Keith Herring 2/14/2019. All data associated with this well, including surveys, are labeled KRU 3H -13A L1-01PB1, API 50-103- 20089-72-00. M Guhl STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION nrrr, ^/ 0 n No WELL COMPLETION OR RECOMPLETION REP RT ANb LOG 1a. Well Status: Oil* Gas❑ SPLUG E] Other El Abandoned El Suspended �/'rV 20AAC 25A05 20AAC 25110 V GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions: 1b. Well Class. Development Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 11/20/2018 14. Permit to Drill Number! Sundry: 218-136 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 1112/2018 15. API Number: 50-103-20089-61-00 4a. Location of Well (Governmental Section): Surface: 1182' FNL, 281' FWL, Sec 12, T12N, RBE, UM Top of Productive Interval: 3473' FNL, 255' FEL, Sec 2, T1 2N, R8E, UM Total Depth: 888' FNL, 1141' FEL, Sec 11, T12N, R8E, UM 8. Date TO Reached: 11/3/2018 16. Well Name and Number: 'KRU 3H-13AL7-011 ' 9. Ref Elevations: KB: 71' GL: 34 ' BF: 17. Field / Pool(s): Kupamk River Field/Kuparuk River Oil Pool r 10. Plug Back Depth MD/TVD: 7357 MD/ 5994 TVD r 18. Property Designation: ADL25531 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 498655 y- 6000475 Zone- 4 TPI: x- 498118 y- 6003464 Zone- 4 Total Depth: x- 497233 y- 6000769 Zone- 4 11. Total Depth MD/TVD: 10699 MD/ 5954 TVD 19. DNR Approval Number: LONS 84-134 & LONS 84-149 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD1 VD: 1628' MD/ 1628 -TVD • 5. Directional or Inclination Survey: Yes (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: • 7730' MD / 6004' TVD 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16' 62.5 H-40 36' 110' 36' 110' 24" 245 sx AS 1 9-5/8" 36 J-55 35' 3072' 35' 2929' 12.25" 1300 sx ASIII, 400 sx G, 70 sx ASI 7" 26 J-55 33' 5970' 33' 5173' 8.5" 300sx G, 175 sx ASI 3-1/2" 9.3 L-80 5808' 7755' 5808' 5983' 311 sxG 24. Open to production or injection? Yes ❑ No 0 If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): e0 71n"J� DATE III20t l0 VER IFI Ep 25. TUBING RECORD SIZE I DEPTH SET (MD) IPACKER SET (MD/TVD) 3-12" 5836' 5808' MD/ 5050' TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑� Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: NIA Method of Operation (Flowing, gas lift, etc.): PLUGGED BACK Date of Test: Hours Tested: Production for Test Period Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Flow Tubing Press. Casing Press: Calculated 24 -Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (corr): Form 10-407 Revised 5/2017 (/?'L 2/F//'7 CONTINUEDONPAGFy, RBDMS VO F -n 01 6 2L1n Submit OR{,G NIAL onnll �( a Ir Le �Ife 28. CORE DATA Conventional Core(s): Yes ❑ No ❑� Sidewall Cores: Yes ❑ No ❑Q If Yes, list formations and intervals cored (MD/TVD, Fromlfo), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑D If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1628 1628 ' Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 7730 6004 information, including reports, per 20 AAC 25.071. Formation @ TPI - Kuparuk A-1 TD 10699 5954 Formation at total depth: Ku aruk A 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: Keith Herrin '0%- Authorized Title: Staff CTD Engineer Contact Email: keith.e.hemin aco .com Authorized Contact Phone: 2634321 Signature: Date: 1iZ119 /R INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item ta: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Altemating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 41b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3H -13A Final CTD Schematic at 110' MD ', 36# J-55 at 3072' MD 7", 26#, J-55 sidetracked at 5970' MD (1997) C -sand pads 7229'-7249' MD Tight spot in 3-1/2" liner 7268'-7313' MD 3-1/2" XL Monobore -sand perfs 7258'-7306' MD 7356'-7366' MD 7372'-7380' MD 3-1/2"Camco DS -nipple at 502' MD (2.813" min ID) 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Camw KBUG gas lift mandrels 2720', 4119, 8 5077' MD 3-1/2" Camco MMM gas lift mandrel 5757' MD 3-1/2" Camco D -nipple at 5803' MD (2.750" min ID) Baker 3-1/2" GBH -22 seal assembly at 5812' MD (3" ID) Liner too Baker 5" z 7" 7XP liner top packer at 5808' MD KOP at 7315' MD Baker 3-112"XL Monohore whipstock 3H-13AL1-03 TD = 8243' MD 2-3/8' eloped firrerw/ deployn ant sleeve TOL = 7258' MD, BOL = 7944' MD 3H-13AL1-02 TD =:47 3' MD 23/6" slotted liner aluminum billet ---- ----- -- - ---_-- TOL=7720'MD, BOL=9473'MD 3H-13AL1PB3 TD = 8810' MD nchored billet= 7999 MD - 3H-13AL1PB1TD=9D85'MD 3-1/T'. 9.3#, L-80 linerI L nchored billet= 7745' MD 5808'-7755' MD )L = 7462' MD, BOL = 10100' MD 314-139 1.01PB1 TD = 10699' MC TOF = 7357' ELMD . BHA stuck at 10462' MD 2"3eeA bAL=68.=90-2Co" BduOng(OL3 3T \Ll P132 TD =10536 MD ;lotted liner wl anchored aluminum billet 7730' MD, BOL = 10347' MD . peraticros Summary (with Timelog L,dpths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK rime Cog sadrepm swrme End Time Dur(hd Phase op code /WixTy Cafe opea¢on (�) End oepih mor) 10/23/2018 10/23/2018 4.00 MIRU MOVE RURD Work RD check list, prep injector & 0.0 0.0 09:30 13:30 reel for move, route inspection, coordinate pre-rig work 10/23/2018 10123/2018 6.50 MIRU MOVE RURD rT-MFLT-X Continue RD checklist, trucks to arrive 0.0 0.0 13:30 20:00 -19:00 hrs, continued coordianlion w/ pre-rig OPS; DTH notified to break down tiger-tank line, disconnet hi-line power 10/23/2018 10/23/2018 0.40 MIRU MOVE RURD P Peak sows on location spot trucks, 0.0 0.0 20:00 20:24 1 1 1PJSM 10/23/2018 10/23/2018 1.30 MIRU MOVE RURD P Jack service unit, attach sow and 0.0 0.0 20:24 21:42 move service unit to beginning of access road. 10 minutes to pick up service side mats, wind increasing sharply. Some issues with hydraulic systems at the outset, - 10-15 min . troubleshoot. 10/23/2018 10/23/2018 0.40 MIRU MOVE RURD P Jack sub, attach sow and stage 0.0 0.0 21:42 22:06 behind service unit. Pull cellar sills, plywood, and heroulite. Pad inspection with pad operator/ company rep. Sign off on environmental form. 10/23/2018 11012312018 0.50 MIRU MOVE RURD P Drop sows, attach jeeps, reattach 0.0 0.0 22:06 22:36 - tandem sows to service and sub. Performed final walk around. Notify security of eminent move. 10/23/2018 10/23/2018 0.60 MIRU MOVE MOB P Roll off pad @ 22:38 toward 31-1-13 - 0.0 0.0 22:36 23:12 17.5 miles 10/2312018 10/23/2018 -0 30 MIRU MOVE MOB P 1.8 miles, at 2G access to spine road, 0.0 0.0 23:12 23:30 make sharp, off camber turn with service and sub & continue toward 3H. 10/23/2018 10124/2018 0.50 MIRU MOVE MOB P Pass through CPF2, continue on 0.0 0.0 23:30 00:00 toward 3H-14. 10/24/2018 10/24/2018 5.30 MIRU MOVE MOB P Complete move from 2G-Pad to 3H- 0.0 0.0 00:00 05:18 Pad 10/24/2018 10/24/2018 1.00 MIRU MOVE MOB P Crew change, drop jeeps, lay herculte, 0.0 0.0 05:18 06:18 pull tree cap 10/24/2018 10/24/2018 3.70 MIRU MOVE MOB P Begin spotting sub, remove platform 0.0 06:18 10:00 hand rails & raise SOP's to dear tree. Thermal siphon blocking rig landing, call out facilities w/crappe,,put down thermal siphon, continbe spotting sub, raise SOP's to max height to clear tree flange w/ BOP studs when setting down off jack. Spotted mats under sub 10/24/2018 10/24/2018 1.00 MIRU MOVE MOB P Spotted pits & laid mats, spotted TT 0.0 0.0 10:00 11:00 150' from rig 10/24/2018 10/24/2018 2.00 MIRU MOVE RURD P Begin RU check list, safe out walk 0.0 0.0 11:00 13:00 ways & landing, connect PUTZ, unlock reel & injector, begin NU BOPE Shop & 1/2-Way House arrive on pad & spotted 10/24/2018 10/24/2018 1.50 MIRU WHDBOP NUND P Continue RU checklist, complete NU 0.0 0.0 13:00 14:30 BOPE, MU TT hard-line Rig Accept: 10124 @ 14:30 hrs 10/24/2018 10/2412018 2.00 MIRU WHDBOP RURD P Compile RU checklist 0.0 O.0 14:30 18:30 Page 1139 Report Printed: 1112012018 operations Summary (with Timelog uepths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sranDeprn Star)Tnre Ertl Imre DirlM Wiaase Op Code Ac"Code TkmXTA Operation (Ma) End OWMM<a) 10/24/2018 10124/2018 2.00 MIRU WHDBOP BOPE P Fluid pack, perform shell test, leak at 0.0 0.0 16:30 18:30 wing valve flange, valve crew attempting to solve issue, test gas alarms. S/I swab #1 in an attempt to bypass and move forward with BOP test, will attempt to blind while we cut coil. Crew change. Leek at bleeder on test, panel, repair. 10/2412018 10/24/2016 3.50 MIRU WHDBOP BOPE P Re -attempt shell test, leak at bleeder 0.0 0.0 18:30 22:00 on the night cap, repair. Pressure up, leak at wing valve bonnet post valve crew tightening. Shut Swab 1 and attempt to move forward, Swab one . leaking past, bleeding out bonnet on Wing valve. Vac stack, pull wing valve, blind flow block, fluid pack. 10/24/2018 10/25/2018 2.00 MIRU WHDBOP BOPE P Shell test - good. Test BOPE's, 0.0 0.0 22:00 00:00 250/4900 psi 2500 psi annular, (witnessed by Lou Laubenslein of the AOGCC) *'*Start BOP test @ 22:00 Valve crew returned and grease locked swab #1 after test #1 - -10 min @ startof test #4 pressures dropping fast, -re-grease stack -11:30 10/25/2018 10/25/2018 4.70 MIRU WHDBOP BOPE P Complete -re -grease stack, B1 0.0 0.0 00:00 04:42 Fail/Pass on re -grease. - 52 minutes total for Test #4 Had to exercise the annular a few time to get it to hold. Completed draw down. 1025/2018 10/25/2018 1.30 MIRU WHDBOP BOPE P Clear floor, test inner reel iron 0.0 0.0 04:42 06:00 - 1025/2018 10/25/2018 1.50 SLOT WHDBOP PRTS P PT PDUs & tiger tank line, clear floor, 0.0 0.0 06:00 07:30 slide in cart "'BOP Test 9.5 hrs 1025/2018 10252018 1.00 SLOT WELLPR CIRC P PJSM, remove UQC, cut & seal a -line, 0.0 0.0 07:30 08:30 stab on, reverse circulate, up to 3.8 bpm, pop off 10/25/2018 1025/2018 1.90 SLOT WELLPR CTOP P RU hydraulic cutter, cut off CTC, cut 0.0 0.0 08:30 10:24 500' of pipe, found a -line at 12', tested le -line 1025/2018 1025/2018 1.80 SLOT WELLPR CTOP P Ream coil, instal CTC, pull test to 0.0 0.0 10:24 12:12 25K, head a -line, inistall UQC, PT to 4200 psi 1025/2018 10/25/2018 2.60 SLOT WELLPR CIRC P MU noule, stab on, circulate 1 coil 0.0 0.0 12:12 14:48 volume forward @ 2 bpm, begin PU tools, put mill & motor in hole, add 1' riser to stack for spacing out tools 10252018 10125/2018 0.60 SLOT WELLPR CIRC P Clear all SIMOPS around TT, bleed IA 0.0 0.0 14:48 15:24 down to 500 psi, climbs back to 950 psi, bleed OA down to 679 psi 10/25/2018 10/25/2018 1.60 SLOT WELLPR PULD P PJSM, PU/PD BHA#1 Milling 0.0 51.0 15:24 17:00 Assemlby (2.72" stabalizer, BOT straight motor, D331 ridge -set mill), SSV not fully open, resolve Mill 2.79" no go 10/25/2018 10/252018 1.20 SLOT WELLPR TRIP P RIH wl BHA #I, EDC open, Getting 51.0 4,990.0 17:00 18:12 some gas back at surface. 10/25/2018 10/25/2018 0.20 SLOT WELLPR DLOG P Tie into unique peak above K1 for+ 1' 4,990.0 5,014.0 16:12 18:24 1 1 1 1 1 correction Page 2139 Report Printed: 1112012018 operations Summary (with Timelog L epths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth awn" EMTme DW (hr) phase op cwte A&,* God. Tme P -T -X operalbrr M®) EM Depth 0903) 10/25/2018 10125/2018 0.10 SLOT WELLPR TRIP P Continue to RIH. 5,014.0 5,206.0 18:24 18:30 10/25/2018 10/25/2018 0.10 SLOT WELLPR DLOG P Logging again to appease the Geo. no 5,206.0 5,245.0 18:30 18:36 correction. 10/25/2018 10/25/2018 1.50 SLOT WELLPR DISP P Continue in hole, slight CT Wt bottle, 5,245.0 5,777.0 18:36 20:06 @ 5803', RIH to 5815'sat down, 4 k WOB. PU 34 k lbs. PUH slowly, ramp up rate from 0.9 to 1.75 bpm. Current losses 1.25 bpm to the formation against an open choke. Tum coil and well over to milling fluid. 10/25/2018 10/25/2018 1.00 SLOT WELLPR MILL P Close EDC, PU Wt 35 k bs, ramp 5,777.0 5,794.0 20:06 21:06 pump to milling rate. CT 3014 psi @ 1.80 bpm in, 1.13 bpm out, free spin diff 427 psi, WH 1 psi, IA 922 psi, OA 770 psi. CT Wt 17 k lbs, RIH, clean @ 5803' no motor work or WOB. Stall @ 5815', PU 34 k lbs, mill through obstruction to 5825'. Pick up through area, clea, no motor work 10/25/2018 10125/2018 0.50 SLOT WELLPR MILL P Drift with pumps off 5,794.0 7,037.0 21:06 21:36 10/25/2018 10/25/2018 0.40 SLOT WELLPR DLOG P Log the K1 for -10' correction. 7,037.0 7,104.0 21:36 22:00 10/25/2018 10/25/2018 0.20 SLOT WELLPR MILL P Continue to RIH dry, set down @ 7,104.0 7,263.8 22:00 22:12 7263.8', WOB 1.6, PU Wt 40 k lbs. •` Bleed IA to 775 psi - gas 10/25/2018 10/25/2018 0.60 SLOT WELLPR MILL P Milling tubing issue @ 7263.8' 7,263.8 7,379.0 22:12 22:48 CT 2961 psi @ 1.75 bpm in, 1.10 bpm out, free spin 394 psi, IA776 psi OA 787 psi, WH 1 psi CT Wt 19 k lbs, Mill through easily, PU, dean. Continue to RIH 10/25/2018 10/25/2018 0.40 SLOT WELLPR MILL P Set down @ 7379', PU 40 k lbs, RBIH, 7,379.0 7,400.0 22:48 23:12 saw nothing tis time, mill to 7,400' - clean 10/25/2018 10/25/2018 0.20 SLOT WELLPR DLOG P PUH Wt 38 k lbs, PUH to 7082' and tie 7,400.0 7,099.0 23:12 23:24 into the K1 for a +1' correction 1025/2018 10/26/2018 0.60 SLOT WELLPR DLOG P PUH to 5775' bit depth, logg CCL to 7,099.0 7,400.0 23:24 00:00 below planned WS set depth. 10/26/2018 10/26/2018 1.50 SLOT WELLPR DLOG P Continue to log CCL to below planned 7,099.0 7,400.0 00:00 01:30 WS set depth. Time out 5X5 sweeps 10/26/2018 101262018 1.60 SLOT WELLPR TRIP P Park, open EDC, PU Wt 38 k lbs, 7,400.0 45.0 01:30 03:06 chase sweeps to bit then POOH. 10/262018 10/26/2018 1.40 SLOT WELLPR PULD P Bump up, bleed off pumps, open up at 45.0 0.0 03:06 04:30 the stack, flood up, flowchec observed flow. Tag up, space out, PUD BHA#1 10/26/2018 10/262018 1.70 PRODt RPEQPT PULD P PU & PD BHA#2, 3.5 " monobore XL 0.0 73.0 04:30 06:12 whipstock, mill came out 2.79" no-go 10/262018 1026/2018 1.40 PROD? RPEQPT TRIP P RIH w/ BHA #2, EDC open 73.0 7,090.0 06:12 07:36 10126/2018 10/26/2018 0.20 PRODt RPEQPT DLOG P Log K1 for -9' correction, PUW = 34K 7,090.0 7,130.0 07:36 07:48 10/26/2018 1026/2018 0.40 PROD1. RPEQPT TRIP P Continue RIH, arrive at setting depth, 7,130.0 7,350.5 07:48 08:12 close EDC, PUW = 35K, bring up pumps, sheard off WS @ 3700 psi, set down 4K, TOWS -7340', oriented 30" ROHS, set down 5K, good, PUW = 36K Page 3/39 ReportPrinted: 1 112 012 01 8 rFF7 _71 _perations Summary (with Timelog . _pths) 3H -13A Conoco?hill"os Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Start Toe BW Tme DW(hr) Phase Opcode Advity Cade Tkne P -T -X Opemtion (Po®) EM Depth (PoCa) 10/26/2018 10/26/2018 1.10 PROD1 RPEQPT CIRC P Open EDC, pump 44 bbl 113K _SRV 7,350.5 7,342.0 08:12 09:18 pill, w144 bbl out bit, bullhead 30 bbl into perfs, bleeding down IA & OA 10/26/2018 10/26/2018 1.70 PRODt RPEQPT TRIP P POOH, park at 535', flow -check well, 7,342.0 73.0 09:18 11:00 have flow, swap tools, pre -load PDL (Unusual WOB values from DPS when POOH), PJSM 10/26/2018 10/26/2018 1.00 PROD1 RPEQPT PULD P PUD BHA#2 73.0 0.0 11:00 12:00 10/26/2018 10/26/2018 0.70 PROD1 WHPST PULD P PDBHA#3WindowAssembly(0.6° 0.0 74.0 12:00 12:42 AKO motor, 2.80 string reamer, 2.80" window mill), 10/26/2018 10/26/2018 0.80 PRODt WHPST RGRP P Allow Peter Obrien time to adjust PLC 74.0 - 74.0 12:42 13:30 software on injlreel (Rig Service) 10/26/2018 10/26/2018 0.80 PROD1 WHPST PULD P Complete PD BHA #3, slide in carl, 74.0 74.0 13:30 14:18 changeout pack -offs, MU to coil, tag up, set counters 10/26/2018 10/26/2018 1.30 PROD1 WHPST TRIP P RIH w/ BHA #3 74.0 7,105.0 14:18 15:36 10/26/2018 10/26/2018 0.10 PROD1 WHPST DLOG P Log K1 for -9' correction, close EDC, 7,105.0 7,129.0 15:36 15:42 - PUW = 36K 10/26/2018 10/26/2018 0.30 PROD1 WHPST TRIP P Continue RIH, dry tag TOWS at 7,129.0 7,341.5 15:42 16:00 7342.2', PLIW = 37K, tag pumping at 17341.5- 10126/2018 10/26/2018 1.00 PROD1 WHPST WPST P Milling window, 1.8 bpm, FS = 455 psi, 7,341.5 7,342.5 16:00 17:00 CWT = 18K, WOB = 1.31K, circ = 3335 psi, WHP = 0 psi, losses -10 bph 10/26/2018 10/26/2018 3.00 PRODt WHPST WPST P Milling window 1 ff/hr, 7,342.5 7,346.5 17:00 20:00 CT 3345 psi, 1.83 bpm in, 1.72 bpm out, FS = 455 psi, WH 9, IA 731 psi, OA 822 psi CWT = 13K, WOB = 2.3, WOB fell off sharply from 7345.5' with increase in moto work Losses 6 bph 10/26/2018 10/26/2018 3.40 PROD1 WHPST WPST P CT 3387 psi, 1.83 bpm in, 1.73 bpm 7,346.5 7,350.5 20:00 23:24 out, FS = 455 psi, WH 9, IA 735 psi, OA 871 psi CWT = 15K, WOB = 0.75, Estimate bottom of window 7347' Losses 6 bph 10/26/2018 10/272018 0.60 PROD1 WHPST WPST P Start drilling open hole 7,350.5 7,357.4 23:24 00:00 CT 3546 psi, 1.83 bpm in, 1.73 bpm out, FS = 455 psi, WH 9, IA 738 psi, OA 900 psi CWT = 15K, WOB = 0.75, Losses 6 bph 10/272018 10/27/2018 0.60 PRODt WHPST WPST P Drill rat hole Q 8-15 ft/hr. 7,357.4 7,362.0 00:00 00:36 Losses 3 bph Bleed OA from 900 psi to 627 psi Bleed IA from 740 psi to 680 ps 10/272018 10/27/2018 1.80 PROD1 WHPST WPST P Performed reaming passes, as milled 7,362.0 7,362.0 00:36 02:24 30'ROHS, HS, 60, and 210 ° ROHS. Small, diminishing, spike in motor work Q -7342' on the first 4 passes. -515 Ib WOB tug at 7345' on up pass at 210 `ROHS. Dry drift - clean, tag rat hole bottom Losses 3 bph Page 4139 Report Printed: 1112012018 Operations Summary (with TimeI09 L._pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start pth Da[3) Start Tim End Time Dur (to) D Phase CP code AtlWTy Code Torre P -T-% Operon (rt End Depth (710) 10/27/2018 10/27/2018 0.40 PROD1 WHPST DISP P PU Wt 38k PUH, park, open EDC, 7,362.0 7,287.0 02:24 02:48 pump 10 bbl sweep, chase with new mud @ 2.20 bpm in, 2.06 bpm out, open choke, WH 16 psi. displace sweep to wellbore. 10/27/2018 10/2712018 1.30 FROM WHPST DISP P POOH chasing sweep to surface while 7,362.0 60.0 02:48 04:06 displacing wellbore to new mud - System #1 Choke acting up, most likely window cuttings. 10/2712018 10/27/2018 1.30 PROD? WHPST PULD P PJSM, Bump up, space out, PUD & 60.0 0.0 04:06 05:24 LD BHA#3, window milling assembly. 10/27/2018 101271201.8 0.70 PROD1 DRILL CIRC P Jet stack 0.0 0.0 0524 06:06 10/27/2018 10/27/2018 3.10 PRODt DRILL PULD T PU & PD BHA #4, AL1 build/turn 0.0 0.0 06:06 09:12 drilling assembly (2.5 *AK motor with RB Baker bit), check pack offs Hung up high -bend motor working through stack & past swab/master, work to free BHA, pull back up into PDL, pop off lubricator, re -grease motor, index bit to correct orientation, pour 5 gal LVT down stack, complete PD 10/27/2018 10/27/2018 1.50 FROM DRILL TRIP P RIH w1 BHA #4 0.0 7,090.0 09:12 10:42 10/27/2018 10/27/2018 0.10 PROD1 DRILL DLOG P Log K1 for-8.5'correction 7,090.0 7,108.5- 10:42 10:48 10/27/2018 10/27/2018 0.60 PROD1 DRILL TRIP P Continue RIH, close EDC, PUW = 7,108.0 7,362.0 10:48 11:24 37K, pull into cased hole to trouble- shoot DD's HSTF values, RBIH 10/27/2018 10/27/2018 1.60 FROM DRILL DRLG P Drilling, 1.8 bpm in, 1.66 bpm out, FS 7,362.0 7,512.0 11:24 13:00 = 550 psi, CWt = 15.4K, WOB = 2.4K, circ= 3281 psi, BHP = 3469 psi, WHP = 160 psi, bump up from 11.2 ppg to 11.3 ppg, losses healing, returns = 95%, avg ROP = 93 fph RA tag = 7347', TOWS = 73417, BOW = 7347' 10/27/2018 10/27/2018 3.10 FROM DRILL DRLG P Drilling, 1.8 bpm in, 1.7 bpm out, 11.4 7,512.0 7,670.0 13:00 16:06 ppg at window, CWT = 11.8K, WOB = 1.8K, BHP = 3581 psi, circ = 3378 psi EOB called at 7670' 10/27/2018 10/27/2018 0.50 PROD1 DRILL DLOG P Log K1 for +1' correction, confirm RA 7,670.0 7,370.0' 15:06 16:36 at 7347' 10127/2018 10/27/2018 1.30 PRODi DRILL TRIP P POOH, EDC open 7,370.0 72.0 16:36 17:54 10/27/2018 10/27/2018 1.30 PROD1 DRILL PULD P Bump up, Space out, Crew change, 72.0 0.0 17:54 19:12 PUD BHA #4, AL1 build/turn drilling assembly. 10/2712018 10/27/2018 1.00 FROM DRILL PULD P PU & PD BHA#5, AL1 lateral drilling 0.0 65.9 19:12 20:12 assembly, 0.5' AKO W HYC A2 RR bit, Check 7 replace pack offs. Bump up, set counters and away we go! 10/27/2018 10/27/2018 1.40 FROM DRILL TRIP P RIH, Park @ 500' and shallow lest 65.9 7,090.0 20:12 21:36 agitalor,grab screen shots. BPM Diff psi Frequency Hz 1.0 380 20.4 1.5 800 15.0 1.8 1244 1244 Page 5139 Report Printed: 11/20/2018 . uperations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth stmt Tme EATme WM Phase OP Code AM* U& Time P -T -x Operation (flK8) End Depth Qtl(B) 10/27/2018 10/27/2018 0.20 PROD1 DRILL DLOG P Tie into the K1 for a -9.5' correction. 7,090.0 7,114.5 21:36 21:48 10/2712018 10/27/2018 0.30 PROD1 DRILL TRIP P PU Wt 35 k lbs, continue to RIH. 7,114.5 7,670.0 21:48 22:06 Widow & build clean. 10/27/2018 10/28/2018 1.90 PROD1 DRILL DRLG P CT 4183 psi @ 1.84 bpm in, 1.70 bpm 7,670.0 7,890.0 22:06 00:00 out, Free spin diff 1470 psi, annular 3644 psi, WH 194 psi, IA 684 psi, OA 666 psi. Mud conditioned down quickly, picked up to reacquire numbers CT 4017 psi @ 1.83 bpm in, 1.73 bpm out, free spin 1113 psi. CT Wt 11 k Ib, WOB 2.2 k lbs, ROP 100 ft/hr. 7920' PU Wt 39 k lbs, pump 5x5 low/high sweep Average ROP 115 fUhr 10/28/2018 10128/2018 1.40 PROD1 DRILL DRLG P CT 4183 psi @ 1.84 bpm in, 1.70 bpm 7,890.0 8,070.0 00:00 01:24 out, Free spin diff 1470 psi, annular 3644 psi, WH 194 psi, IA684 psi, OA 666 psi. Mud conditioned down quickly, picked up to reaquire numbers CT 4017 psi @ 1.83 bpm in, 1.73 bpm out, free spin 1113 psi. CT Wt 11 k Ib, WOB 2.2 k lbs, ROP 100 ft/hr. 7920' PU Wt 39 k lbs, pump 5x5 low/high sweep Average ROP 128 ftlhr 10/28/2018 10)28/2018 0.20 PROD1 DRILL WPRT P PU Wt 39 k lbs 8,070.0 7,673.0 01:24 01:36 400'wiper#1 10/28/2018 10/28/2018 0.20 PROD1 DRILL WPRT P RBIH 7,673.0 8,070.0 01:36 01:48 RIH Wt 16 k lbs 10/28/2018 10/28/2018 0.70 PROD1 DRILL DRLG P CT 4252 psi @ 1.83 bpm in, 1.73 bpm 8,070.0 8,235.0 01:48 02:30 out, Free spin diff 1261 psi, annular 3684 psi, WH 202 psi, IA 691 psi, OA 724 psi. CT Wt 5.6 k Ib, WOB 2.7 k lbs, ROP 245 fUhr. Average ROP 235 ft/hr 10/28/2018 10/28/2018 2.10 PROD1 DRILL DRLG P Hit something hard 8235', PU and 8,235.0 8,425.0 02:30 04:36 restart, PU Wt 42 k lbs CT 4563 psi @ 1.83 bpm in, 1.74 bpm out, annular 3680 psi, CT Wt 5.8 k Ib, WOB 2.5 k lbs, ROP 16 -200 fl/hr. Drilled through@ 8241' took a little influx, pinched in choke to 11.8 at the window. 1.83 bpm in , 1.72 bpm out Average ROP 90 ft/hr 10/2812018 10/28/2018 0.20 PROD1 DRILL WPRT P PU Wt 41 k lbs 8,425.0 7,680.0 04:36 04:48 745'wiper#2 10/28/2018 10/28/2018 0.20 PROD1 DRILL WPRT PRBIH 7,680.0 8,425.0 04:48 05:00 RIH Wt 16 k lbs 10/28/2018 10128/2018 1.00 PROD1 DRILL DRLG P CT 4245 psi @ 1.79 bpm in, 1.69 bpm 8,425.0 6,512.0 05:00 06:00 out, 1,162 free spin diff, annular 3784 psi, CT Wt 8.8 k Ib, WOB 2 k lbs, ROP 135 ftlhr, PUW = 45K, crew change Page 6139 Report Printed: 1112 012 01 8 Uperations Summary (with Timelog � -pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stat Time Pnd TM DIM Phare OP Cade A Code Time P -T -x Opmsan slat Depen P(B) End Depat(al(i) 10/2812018 10/28/2018 2.00 PROD1 DRILL DRLG P Drilling, FS = 1138 psi, CWT= 0.5K, 8,512.0 8,600.0 06:00 08:00 WOB= 1.2K, BHP= 3753 psi, WHP= 240 psi, circ = 4313 psi, -93% returns, pump 5x5 sweeps, lower ROP through 125 API lithology (down'to 40 fph), Avg ROP 44 fph 10/28/2018 10/28/2018 2.00 PRODt DRILL DRLG P Drilling, CWT =3.3K, WOB =1.5K, 8,600.0 8,684.0 08:00 10:00 BHP = 3764 psi, circ = 4470 psi, -91% returns, continued lower ROP (45 - 70 fph), drilling w/ negative CWT, PUW's =-44K-46K, Avg ROP 42 fph 10/28/2018 10/28/2018 0.60 PROD1 DRILL WPRT P Wiper up -hole to window, chasing 8,684.0 7,080.0 10:00 10:36 sweeps, PUW = 48K Pulled early to allow Peter O'brien chance to verify injlreel changes & reboot software update prior to leaving slope, & clean up higher gamma silt interval 10/28/2018 10/28/2018 0.20 PROD1 DRILL DLOG P Log K1 for+4' correction 7,080.0 7,120.0 10:36 10:48 10/28/2018 10/28/2018 0.30 PROD1 DRILL SVRG P Peter verifies inj/reel changes & 7,120.0 7,120.0 10:48 11:06 reboots software, software install complete (shut -down pump, shut-in choke) 10/28/2018 10/28/2018 0.90 PROM DRILL WPRT P Wiper in-hole, RIW = 10.31K, BHP 7,120.0 8,684.0 11:06 12:00 spiked at 8687', PUW = 44K, line-up to choke A, RBIH, stacking weight beginning. at 8625' up through Iowa Al silt 10/28/2018 10/28/2018 2.00 PROD? DRILL DRLG P BOBD,CWT=-7K,WOB=1.IK,BHP 8,684.0 8,920.0 12:00 14:00 = 3783 psi, WHIP = 275 pis, circ = 4367 psi CWT coming back drilling past higher gamma interval, drilling break at -8760', Avg ROP 118 fph Blew -down choke B, medium sized silt cavings observed 10/28/2018 10/28/2018 1.70 PROM DRILL DRLG P Drilling, CWT =4.3K,WOB=1.8K, 8,920.0 9,085.0 14:00 15:42 BHP = 3830', circ = 203 psi, BHA wiper from 8955', PUW = 42K, pump 5x5 sweeps 10/2812018 10/28/2018 0.30 PROM DRILL WPRT P Wiper up -hole, PUW =42K 9,065.0 8,265.0 15:42 16:00 10/28/2018 10/28/2018 0.80 PROD1 DRILL WPRT P Wiper in-hole, stack weight at 8349', 8,265.0 9,085.0 16:00 16:48 PU, RBIH, stacking weigt at 8390' to 8442', up to -2.71K WOB on PU's, pump HiVis sweeps, continue stacking through to 8635', PUW = 52K Bore & annular climbing, begin packing off, PUH, pulling heavy through to 8500'(-5K WOB), reciprocate to work off packoff, pulled up to 65K 10/28/2018 PROD1 DRILL TRIP T Pull to window, building sweeps, 9,065.0 7,233.0 16:48 18:48 circulate bottoms up, pump, large 110/2a120182.00 amounts off large cavngs returned to the shaker. Page 7139 Report Printed: 11120/2018 Uperations Summary (with Timelog . _pths) 3H -13A . e .• Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tine Lag start" Depth sau7me EM Tire pa(nr) Phase opcune Adwity cone rates e P -T -x (10" 6d Dealt ntlta) 10/28/2018 10/28/2018 2.00 PROD1 DRILL CIRC T RIH, window and build clean, turned 7,233.0 7,220.0 18:48 20:48 around in middle of build, pulled to just below window, RBIH to EOB, clean, pull to just below window chasing 5x5 sweep, clean - sweep carried 1/8" caving's to surface, RBIH to 7780, trip in was clean. PU Wt, 36 k Ibs, clean, Pull -41k WOB @ 7760', RBIH, SID @ 7667' 4.5K WOB, PU 52 K, 4.5 k WOB, pop free. Tum around at 773T RBIH to 7780' clean, PU 36 k lbs, 4.3 k lbs WOB @ 7759' again. Tum around @ 7579', RBIH, to 7781', pull 10 ft/min, pumping 1.8 bpm, -Cleanl Build clean window clean. 10/2812018 10/28/2018 1.80 PROD1 DRILL TRIP T Continue out of hole, chase three 7,220.0 70.0 20:48 22:36 separate 5x5 sweeps timed to exit at window, 3000', and surface. Diminishing solids returns each time. Perform shallow jog at surface, Pre - load PDL while POOH. Last sweep at surface was clean. 10/28/2018 10/29/2018 1.40 PROD1 DRILL PULD T Bump up, PUD and LD BHA# 5. Bit 70.0 0.0 22:36 00:00 graded 1,1, NO 10/29/2018 10/2912018 1.40 PROD1 STK PULD T PU & PD BHA *6, Billet W open hole 0.0 70.0 00:00 01:24 1 1 1 anchors. 10/2912018 10/29/2018 1.30 PRODi STK TRIP T RIH 70.0 7,090.0 01:24 02:42 10/29/2018 10/29/2018 0.20 PROD1 STK DLOG T Tie into the K1 marker for -8' 7,090.0 7,123.4 02:42 02:54 correction. 10/29/2018 10/29/2018 0.50 PROD1 STK WPST T Continue in hole, PU Wt 37 k @ 7,123.4 7,756.8 02:54 03:24 7285', park, down on pump, Close EDC, continue in hole, Window and build clean. Park on depth, PU 30k to neutral CT Wt, Online w pump, observe sheer @ 4600 psi. Stack 3 k WOB on billet, PU Wt 36 K 10/29/2018 10/29/2018 1.50 PRODi STK TRIP T PU Wt 36 K 7,756.8 70.0 03:24 04:54 PUH, Open EDC, Continue out of hole. 10/29/2018 10/2912018 1.40 PROD1 STK PULD T Bump up, PUD & LD BHA#6. Crew 70.0 0.0 04:54 06:18 change. 10/29/2018 10/29/2018 1.30 PROD1 STK PULD T PD BHA#7 KO/Lateral Assembly 0.0 73.0 06:18 07:36 (NOV agitator, 0.5" AKO motor, RB P104 bit), slide in cart, MU to coil, tag up, set counters 10/29/2018 10/29/2018 1.40 PROD1 STK TRIP T RIH w/BHA #7, close EDC, shallow 73.0 7,090.0 07:36 09:00 test @ 645' & grab transducer screenshot, 1.8 bpm, circ = 4430 psi, FS = 1070 psi 10/2912018 10/2912018 0.20 PRODt STK DLOG T Log K1 for -8' correction, PUW = 34K 7,090.0 7,134.0 09:00 09:12 10/29/2018 10/29/2018 0.70 PROD1 STK TRIP T Continue RIH, dry tag TOB at 7746.5, 7,134.0 7,745.8 09:12 09:54 PUW = 38K, pumping 1.8 bpm, milling at 7745.8' 10/29/2018 10/29/2018 0.30 PROD1 STK KOST T Milling, pumping 1.82 bpm, FS = 1070 7,745.8 7,754.4 09:54 10:12 psi, CWT= 16.2K, WOB =.1 K, BHP = 3608 psi, W HP =112 psi, circ = 4247 psi WOB & motonvork milling off immediatley, begin chasing to find any WOB, not seeing WOB or motonvork Page 8139 Report Printed: 11/2012018 Operations Summary (with Timelog L_pths) 3H -13A ..o Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Smn Depth Satrme I EMTme Durpa) Phase Op Code AcU%*Code Time P -T -x Opeatlan MO) End D"th(110) 10/29/2018 10/29/2018 0.10 PROD1 STK KOST T PUH, PUW = 37K, RBIH to dry tag 7,754.4 7,756.0 10:12 10:18 billet & troubleshot issue, tag TOB 7752.8', a lot of aluminum over shakers 10/29/2018 10/29/2018 0.80 PROD1 STK KOST T Go back to milling, stall getting going, 7,756.0 7,762.0 10:18 11:06 milling from 7756', CWT = 13K, WOB = 1.36K, dp = 1476 psi, chasing WOB to get away from billet, stall at 7758.4' (approx slips depth), PUW = 42K, drill to 7762' & stall (up to 115 fph), PUW = 38K, begin dragging -41K WOB at 7755', RBIH & stall at 7758', RBIH, packing off, rate out falls to 0 bpm out 10/29/2018 10/29/2018 0.40 PROD1 DRILL CIRC T Packed off at MM beginning at 7752', 7,762.0 7,329.0 11:06 11:30 PUH to above billet w/ no returns, no over pull or negative WOB, large caving appear over shaker, pump 10x10 sweeps working PUH to cased hole, packed off again at 7617' (believe at surface), blow down choke B, swap over, packed off immediately in cased hole (believe packed off at surface). 10/29/2018 10/29/2018 0.80 PROD1 DRILL CIRC T Blow, down, choke A& B, blowdown 7,329.0 7,030.0 11:30 12:18 MM & snake, back on choke B, packed off, BHP climbing, chokes by- passed as both are packed off, open MP lines to check pressures to determine pack -off location, see 1200 psi on MP line, pack -off likely in return line. Confer w/ town, decision made to reduce pump rate. 10/29/2018 10/29/2018 1.00 PROD1 DRILL CIRC T Slowly PUH, formulate plan to reverse 7,030.0 6,856.0 12:18 13:18 circulate through return line: shutdown pumps, close lower 2" pipe -slip rams, close SR 1 & SR2, close R8, open RC1 & RC2, bleed off above rams through riser, MU 2" 90 on riser. Pump back & have communication through return line hose. Line up down coil, have returns, though quickly re -pack off 10/29/2018 10/29/2018 1.20 PROD1 DRILL CIRC T Bi -pass chokes & MM, pump at 1.9 6,856.0 6,841.0 13:18 14:30 bpm (11.14 ppg at window), pump sweeps, circulate bottoms up, blow down chokes A & B, snake MM & button back up. Have returns, chokes & MM are all cleared. 10/29/2018 10/2912018 0.20 PROD1 DRILL DLOG T Log, K1 for +.5' correction 6,841.0 7,340.0 14:30 14:42 10/29/2018 10/29/2018 0.80 PROW DRILL CIRC T RIH to TOB, pump 5x5 sweeps, chase 7,340.0 7,340.0 14:42 15:30 1 1 to TOWS, circulate bottoms up 10/29/2018 10/29/2018 0.20 PROD1 DRILL TRIP T RBIH to TOB, drop pumps, tag at 7,340.0 7,758.0 15:30 15:42 7759', PUW = 35K (approximate depth of slips) 10/2912018 10/29/2018 1.50 PROM DRILL TRIP T RBIH, 1.8 bpm at -3.5 fph, pass 7,758.0 7,762.4 15:42 17:12 7758', continue in slow to 7762', BHP = 3775 psi, WHIP = 249 psi, CWT = 15.5K, WOB =.25K, increasing WOB & motorwork from 7761' Page 9139 ReportPrinted: 1112012018 Operations Summary (with TimelOg L aths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log. SM oe„m StotTma I Erid Tire Mr(hr) Phase Op Code Activily Cale Time P-T.X opefafm MM) EM Depth M(3) 10/29/2018 10/29/2018 1.30 PROD1 DRILL DRLG T Drilling from 7762.4', CWT = 16K, 7,762.4 7,772.0 17:12 18:30 WOB = 1.41K, dip = 1360 psi, WOB spiking to 2.41K, then falling off, increase ROP to 112 fph, seeing little WOB, PUH above billet, PUW = 44K, RBIH to tag bottom (If in old hole should now know) 10/29/2018 10/29/2018 0.60 PROD1 DRILL DRLG T Drilling, CWT =7K, WOB =2.4K, BHP 7,772.0 7,848.0 18:30 19:06 = 3748 psi, WHIP = 152 psi, NBI indicates getting away from old hole 10/29/2018 10/29/2018 0.40 PROD1 DRILL TRIP T Dry drift billet area up & down, clean, 7,848.0 7,848.0 19:06 19:30 PUW = 48K, short -1.8K WOB spike at 7805' 10/29/2018 10/29/2018 2.20 PROM DRILL DRLG T Drilling, CWT= 10K, WOB = 1.7K, 7,848.0 8,181.0 19:30 21:42 BHP = 3721 psi, WHIP = 138 psi, - 97% returns, pumps 5x5 sweeps, Avg ROP 151 fph Swap to mud system #2, new mud at bit 7912' 10/29/2018 10/29/2018 0.30 PROM DRILL WPRT T Wiper up -hole, PUW =38K 8,181.0 7,780.0 21:42 22:00 10/29/2018 10/29/2018 0.30 PROM DRILL WPRT T Wiper in-hole, RIW = 16K 7,780.0 8,181.0 22:00 22:18 10/29/2018 10/30/2018 1.70 PROD1 DRILL DRLG T Drilling, 1.8 bpm, CWT= 11 K, WOB = 8,181.0 8,486.0 22:18 00:00 2K, BHP= 3737 psi, WHIP= 335 psi, circ = 4500 psi, drop to 1.5 bpm to allow DO to grab survey 10/30/2018 10/30/2018 0.60 PROD1 DRILL DRLG T OBD, CT Wt 8 k be, 1.6 k WOB, 8,486.0 8,565.0 00:00 00:36 holding 11.8 ppg @ the window WH 246 psi, IA 690 psi, OA 740 psi PU 8653'44 k free spin on restart 1006 psi 10/30/2018 10/30/2018 0.20 PRODt DRILL WPRT T PU Wt 37 k lbs, Wiper trip #2-800' 8,565.0 7,790.0 00:36 00:48 Drag neg WOB, -1.68 K His, @ 7800' 10/30/2018 10/30/2018 0.30 PROM DRILL WPRT T RBIH 7,790.0 8,565.0 00:48 01:06 Stack out 7792'4.7 K WOB, 7804'3.3 k WOB, and 7816'2.3 k WOB, bounced on don, didn't pick up. Clean the rest of the way to bottom. 10/30/2018 10/30/2018 1.00 PROD1 DRILL DRLG T CT 4200 psi @ 1.79 bpm in 1.74 bpm 8,565.0 8,704.0 01:06 02:06 out, free spin diff 1027 psi, CT RIH Wt 16 k His, annular 3800 psi OBD, CT Wt 6 k lbs, WOB 1.94 k lbs, 10/30/2018 10/3012018 2.00 PROD1 DRILL DRLG T 8,706'PU WT 45k lbs - Something 8,704.0 8,770.0 02:06 04:06 hard, ROP fell to 23 ft/hr CT Wt 4.8 k lbs, WOB 2.30 k bs, ROP 33 if/ hr - most likely found the fault Gamma climbed rapidly to 143 API max 153, seeing soft clay balls at the shaker. 10/30/2018 10/30/2018 0.70 PROD1 DRILL DRLG T Drilling break, Gamma claned up and 8,770.0 8,877.0 04:06 04:48 resistivity returned to normal. 10/30/2018 10/30/2018 0.30 PRODt DRILL DRLG T On another hard spot. ROP down to 8,770.0 8,878.0 04:48 05:06 1 1 10 f/hr. 10/30/2018 10/30/2018 0.50 PROM DRILL DRLG T Drilling break and losses, 1.78 in, 1.34 8,878.0 8,965.0 05:06 05:36 bpm out, slowly healing PU 39 k RBIH, 10/30/2018 10/30/2018 0.60 PROM DRILL WPRT T PU Wt 40 k lbs, Wiper trip#3 to 8,965.0 7,358.0 05:36 06:12 window for tie in. 10/30/2018 10/30/2018 0.20 PROM DRILL DLOG T Tie into the RA tag for+2' correction. 7,358.0 7,392.0 06:12 06:24 10/30/2018 10/3012018 0.60 PROD1 DRILL WPRT T RBIH 7,392.0 8,965.0 06:24 07:00 Page 10/39 Report Printed: 1112 012 01 8 . operations Summary (with TimelOg L _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stat Time Ertl Tme our(hr) Phase oP co Activity Co Tama P -T -x Operetlon stall oepth (fil®) End OpN(W) 10/30/2018 10/30/2018 0.90 PROD1 DRILL DRLG T Ct 4637 psi, Q 1.83 bpm in, 1.76 bpm 8,965.0 9,085.0 07:00 07:54 out, Free spin diff 1123 psi, annular, 3824 psi, IA 703, Oa 784 psi CT WT 7 k lbs, WOB 1.86 k lbs 9053' PU Wt 39 k lbs Average WOB. 10/30/2018 10/302018 2.00 PROD1 DRILL DRLG P Drill ahead 9,085.0 9,365.0 07:54 09:54 9191' PU W152 k lbs, pump 5x5 sweep and pul BHA wiper, RBIH ROP increased from 100 to 240 as sweep exited, adding 1% 776 to high vis 10/30/2018 10/30/2018 0.30 PROD1 DRILL WPRT P PU Wt 40 k lbs, Wiper trip #1-800' 9,365.0 8,565.0 09:54 10:12 10/30/2018 10/30/2018 0.30 PRODI DRILL WPRT P RBIH, 8,565.0 9,365.0 10:12 10:30 SID 8786', PU and try to work through x3, no luck Rolled TF from HS to as drilled, RIH no issue 10/30/2018 10/302018 4.40 PRODI DRILL DRLG P Ct 4784 psi, Q 1.82 bpm in, 1.76 bpm 9,365.0 9,765.0 10:30 14:54 out, Free spin diff 1219 psi, annular, 3838 psi, IA 703, Oa 797 psi CT WT 5 k lbs, WOB 1.58 k be 10/30/2018 10/30/2018 0.30 PROD1 DRILL WPRT P PU Wt 39 k lbs, Wiper trip #2 - 800' 9,765.0 8,958.0 14:54 15:12 10/30/2018 10/30/2018 0.30 PRODI DRILL WPRT P RBIH, clean 8,958.0 9,765.0 15:12 15:30 10/30/2018 10/30/2018 4.00 PROW DRILL DRLG P Ct 4859 psi, Q 1.81 bpm in, 1.69 bpm 9,765.0 9,969.0 15:30 19:30 out, Free spin diff 1062 psi, annular, 3909 psi, WH 191, IA 707, OA 809 psi, CT WT 3 k lbs, WOB 1.1 k be - ROP 30 -100 ft/hr 10/30/2018 10/30/2018 0.60 PROD1 DRILL WPRT P Geo wiper, PUW=43K 9,969.0 9,969.0 19:30 20:06 10/30/2018 10/30/2018 1.90 PROD1 DRILL DRLG P Drilling, 1.8 bpm, CWT = -1.5K, WOB 9,969.0 10,062.0 20:06 22:00 = 1.35K, BHP = 3902 psi, WHIP = 162 psi, PU's to continue drilling, Avg ROP 49 fph Mud Swap to system #3, hit bit at 10,026' 10/30/2018 10/30/2018 1.50 PRODI DRILL DRLG P Drilling, 1.8 bpm, CWT = 2K, WOB = 10,062.0 10,200.0 22:00 23:30 1.3K, BHP = 3890 psi, WHP = 306 psi, circ = 4768 psi, pump 5x5 sweeps, 10/30/2018 10/312018 0.50 PROD1 DRILL WPRT P Begin wiper to window, PUW=40K 10,200.0 8,775.0 23:30 00:00 10/31/2018 10/31/2018 1.50 PROD! DRILL WPRT P Continue wiper to window, rate out 8,775.0 7,360.0 00:00 01:30 drops, packing off, RBIH, stack WOB at 8775', unable to move down or up, sit at just over PUW, pumpiing, allow pack -off to erode, pull free, silt -stone over shakers from lagged depth of 8775', slow down, pump 5x5 sweeps, circulate sweeps to surface. 10/31/2018 10131/2018 0.10 PROD1 DRILL DLOG P Log RA for+4' correction 7,360.0 7,380.0 01:30 01:36 10/31/2018 10/3112018 1.20 PRODI DRILL WPRT P Wiper in-hole, ran through trouble 7,380.0 10,200.0 01:36 02:48 interval 8750 - 8775' at min rate, saw 1.6K WOB at 8761', then fell off, RI W = 5K Page 11/39 ReportPrinted: 11/20120181 operations Summary (with Timelog ..pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stun Depth SMdThoe End True Oerrrd preset op Code Activq Code Time P -T -x operation (til®) End Depth lPo(B) 10/31/2018 10/3112018 2.20 PROD1 DRILL DRLG P Drilling, 1.8 bpm, FS = 1090 psi, CWT 10,200.0 10,356.0 02:48 05:00 = 2K, WOB = 1 K, BHP = 3900 psi, WHP = 259 psi, circ = 4736 psi, PUW = 48K from 10,293', PUW = 54 from 10,331' 10/31/2018 10131/2018 4.80 PROD1 DRILL DRLG P Drilling, CWT= -0.5K, WOB=1K, 10,356.0 10,535.0 05:00 09:48 BHP = 3949 psi, WHP = 289 psi, circe = 4822 psi 10/31/2018 10/31/2018 3.20 PROD1 DRILL WPRT P Geo called TD @ 10535' 10,535.0 78.0 09:48 13:00 PU WT 40 k lbs - launch 10x10 TD sweeps, while PUH slowly. Increase to normal POOH rate and chase sweeps to surface. Time tow additional 5x5 sweeps for the trouble area @ 8700' and the build. Saw some motor work @ 8713', continued out of hole Lots of very small but fresh cavings at 2300 bit depth, surged well near surface, quite a bit of aluminum and some larger, more rounded rocks at the shaker. 10/31/2018 10/31/2018 1.30 PROD1 DRILL TRIP P RBIH 398.0 7,080.0 13:00 14:18 10/31/2018 10/31/2018 0.20 PRODI DRILL DLOG P Tie into K1 for -8.5' correcion. 7,080.0 7,163.0 14:18 14:30 10/31/2018 10/31/2018 0.20 PRODI DRILL DLOG P Park @ 7326.09' CTMD, 5953.08' 7,163.0 7,326.0 14:30 14:42 TVD Trap 3763 psi 1 min 3683 psi 11.89 ppg 2 min 3632 psi 11.80 ppg 3 min 3632 psi 11.73 ppg 4 min 3612 psi 11,61 ppg 5 min 3588 psi 11.59 ppg 10/31/2018 10/31/2018 1.80 PRODI DRILL TRIP P Continue to RIH, window, build, and 7,326.0 10,328.0 14:42 16:30 falut at 8700' clean 10/31/2018 10/31/2018 2.30 PROD1 DRILL DISP P POOH displacing well to liner running 10,328.0 78.2 16:30 18:48 pill - 52 bbls top of pill 4400'. Painted Yellow flag 8478.4' 10/31/2018 10/31/2018 0.50 PROD1 DRILL OWFF P At surface, check well for flow (no- 78.2 78.2 18:48 19:18 flow), PJSM 10/31/2018 10/31/2018 0.45 PROD1 DRILL PULD P LD drilling assembly on a dead well 78.2 0.0 19:18 19:45 10/31/2018 10/31/2018 0.30 PROD1 DRILL OTHR P Perform Function test on BOP stack. 78.2 19:45 20:03 (good test), LD testjoint 10/31/2018 10/31/2018 0.40 COMM CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0 20:03 20:27 10/31/2018 10131/2018 2.75 COMPZI CASING PUTB P PU 55 joints of slotted liner with non- 0.0 1,840.7 20:27 23:12 ported bullnose and shorty deployment sleeve. 10/31/2018 10/31/2018 0.25 COMPZI CASING PUTB P RD liner running equipment 1,840.7 1,840.7 23:12 23:27 10/31/2018 11/1/2018 0.55 COMPZI CASING PULD P PJSM, PU/MU CoilTrak tools, 1,840.7 1,884.9 23:27 00:00 (hanging dg hook -load 21.49 k), spaceout, close 2-3/8" on tool string, bring cart forward 11/1/2018 11/112018 0.45 COMPZI CASING PULD P Swap out float valves in UQC, stab 1,884.9 1,884.9 00:00 00:27 INJH, surface test BHI CoilTrak tools (good -test), function open rams, tag up, reset counters 11/1/2018 11/1/2018 1.44 COMPZ1 CASING RUNL P RIH w/liner segment#1 1,884.9 7,296.1 0027 01:53 Page 12/39 ReportPrinted: 1112012018 Operations Summary (with Timelog �. pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log ataM1 OepN SWTree EWTkM W #td Phase OpCode Arbviy dOde Time P -T -x Ope2tion (Pole) EM Depth (flNB) 11/112018 11/1/2018 0.10 COMPZI CASING RUNL P Correct to the EDP flag minus 11.0', 7,296.1 7,296.1 01:53 01:59 PUW 11/1/2018 11/1/2018 0.30 COMPZI CASING RUNL P Continue RIH 7,296.1 8,166.0 01:59 02:17 11/1/2018 11/112018 1.75 COMPZI CASING RUNL P Start working liner towards bottom, 8,166.0 9,960.0 02:17 04:02 PUW's 45-50k 11/1/2018 11/1/2018 0.20 COMPZI CASING RUNL P Continue RIH to bottom 9,960.0 10,347.0 04:02 04:14 11/1/2018 11/1/2018 2.00 COMPZI CASING TRIP P Off bottom, PUW 34 k, remove liner 10,347.0 58.0 04:14 06:14 length from depth, lined up across the top, POOH 11/1/2018 11/1/2018 0.60 COMM CASING PULD P Crew change, PJSM, bump up, flow 58.0 0.0 06:14 06:50 check, LD BHA#8, IowerAL1 completion running assembly. 11/1/2018 11/1/2018 0.40 COMM CASING PUTS P Prep floor to run liner 58.0 0.0 06:50 07:14 11/1/2018 11/1/2018 0.50 COMM CASING SVRG P Lock out comy to repair hydralic weep 0.0 0.0 07:14 07:44 1 1 Ion HCR - B8, (recently replaced) 11/1/2018 11/1/2018 1.20 COMPZI CASING PUTS P Pick up and run 19 joints under an 0.0 763.7 07:44 08:56 anchored billet. (763.69' LOA) 11/1/2018 11/1/2018 0.90 COMPZI CASING PUTS P PU BHA#9, Upper completion 763.7 837.1 06:56 09:50 running assembly. 11/1/2018 11/1/2018 1.60 COMPZI CASING RUNL P RIH, Tie.into the windowflag for a-8.9' 837.1 8,062.0 09:50 11:26 correction, Close EDC. PU Wt 35k lbs @ 7226' Encounter sharp WOB increase as bull nose approached the billet @ 7745'. Stack 10 k WOB @ 7877', slow running speed from 26 ft/min to 17 ft/min Stack 10.9 k WOB again at 8,062 bit depth, PU Wt 37 k lbs 11/1/2018 11/1/2018 1.60 COMPZI CASING PULL T PUH, park, open EDC, POOH, update 8,062.0 844.0 11:26 13:02 window flag depth to account for planed BHA change. 11/1/2018 11/1/2018 0.80 COMPZI CASING PULD T Bump up, flow check, 0.4 bbls to fill 844.0 809.1 13:02 13:50 1 stack, LD liner running tools. 11/1/2018 11/1/2018 0.90 COMPZI CASING PULD T MU BHA#10, (drop off HOT, pick up 809.1 809.1 13:50 14:44 GS and make up shorty to liner) 11/1/2018 11/1/2018 1.80 COMPZI CASING RUNL T Bump up, set counters, RIH, 809.1 8,506.7 14:44 16:32 PU Wt 35 k lbs @ 7209', WOB -3 on pick up. RIH widow, billet clean, SID 8506' PU Wt 36 k lbs, RBIH, SID 8506.6'& 4.2 k WOB Pump 1.5 bpm, only built 104 psi diff, SID, discuss, pump 1.7 bpm, max safe for BHP, built 3576 psi on CT and 127 psi diff 11/1/2018 11/1/2018 2.00 COMPZI CASING TRIP T PU, WOB-2.2 klbs POOH with AL1 8,506.7 809.1 16:32 18:32 upper completion. Suspect EDC has failed. Park at 6884', cycle EDC open then closed, 11/1/2018 11/1/2018 0.45 COMPZI CASING PULD T At surface, check well for flow, unstab 809.1 764.9 18:32 18:59 INJH, MU test plate to end of coil, PT 4,100 psi (good -test), move cart back, continue inspecting Coiltrak Tools, found EDC failure, PJSM for contengencies while swapping out tools, 11/1/2018 11/1/2018 0.50 COMPZI CASING PULD T Swap out upper section, 764.9 764.9 18:59 19:29 I Page 13139 ReportPrinted: 1112 012 01 8 . Operations Summary (with Timelog �_pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slat Tme Ertl Tme Dvft) Phase Dpca Atlimy Code Time P -T -X eperalion SWd Depth (AKS) End DeA �) 11/1/2018 11/1/2018 0.25 COMPZ1 CASING PULD T Move cart forward, MU Coil, perform 764.9 809.1 19:29 19:44 surface test (good -test) 11/1/2018 11/1/2018 0.10 COMPZI CASING PULD T Stab on INJH, tag up reset counters, 809.1 809.1 19:44 19:50 RIH vu/BHA#11 11/1/2018 11/1/2018 1.00 COMPZI CASING RUNL T RIH, w/19 its of slotted liner, ported 809.1 7,222.0 19:50 20:50 . bullnose, and shorty deployment sleeve, BHA#11 liner segment #2 11/1/2018 11/1/2018 0.15 COMPZI CASING RUNL T Correct to the EOP flag plus 16.01, 7,222.0 7,222.0 20:50 20:59 PUW 35 k, minus 4.4 k DHWOB 11/1/2018 11/1/2018 0.20 COMPZI CASING RUNL T Continue IH 7,222.0 7,830.0 20:59 21:11 11/1/2018 11/1/2018 0.40 COMPZ1 CASING RUNL T Log the K1 for depth control, minus 7,830.0 7,830.0 21:11 21:35 25' (minus 9.01 11/1/2018 11/1/2018 0.25 COMPZ1 CASING RUNL T Continue RIH 7,830.0 8,506.0 21:35 21:50 11/1/2018 11/1/2018 0.15 COMPZI CASING RUNL P Set down, 2.3 k, PUW 37 k, set back 8,506.0 7,730.0 21:50 21:59 down, 3.5 k, bring pump up to 1.4 bpm at 3,953 psi, 1,099 psi diff, PUW 32 k minus 2.2 DHWOB, liner released, park at remove liner length from counter depths 11/1/2018 11/1/2018 1.50 COMPZI CASING TRIP P POOH, pumping min rate down the 7,730.0 44.2 21:59 23:29 coil, PJSM @ 2,500' 11/1/2018 11/2/2018 0.51 COMPZ1 CASING PULD P At surface, check well for flow, LD 44.2 0.0 23:29 00:00 setting tools BHA#10 11/212018 11/2/2018 0.75 COMPZI CASING PULD P PUIMU OH Anchored Billet, MU 0.0 73.4 00:00 00:45 CoiilTrak tools, MU UQC, surface test tools (good -test), stab and MU INJH, tag up, reset counter depths 11/2/2018 11/2/2018 1.20 COMPZI CASING TRIP P RIH, with OH Anchored Billet (open- 73.4 7,095.0 00:45 01:57 EDC), pumping min rate 0.35 bpm at 356 psi 11/2/2018 11/2/2018 0.30 COMPZ1 CASING DLOG, P Log the K1 marker correction of minus 7,095.0 7,121.0 01:57 02:15 7.5', close EDC, PUW 35 k 11/2/2018 11/2/2018 0.20 COMPZI CASING TRIP P Continue IH 7,121.0 7,741.0 02:15 02:27 11/2/2018 11/2/2018 0.20 COMPZI CASING WPST P Set dawn 2.2 k DHWOB, PUH to 7,741.0 7,730.0 02:27 02:39 neutral weight, bring pump up at 0.5 bpm up to shear 2,600 psi, PUW 38 k 11/2/2018 11/2/2018 1.50 COMPZI CASING TRIP P POOH, pumping 0.72 bpm at 1,127 7,730.0 44.2 02:39 04:09 psi, PJSM @ 500' from surface 11/2/2018 11/2/2018 0.50 COMPZI CASING PULD P At surface, LD setting tools on a dead 44.2 0.0 04:09 04:39 well. 11/2/2018 11/2/2018 1.00 PROD2 STK PULD P PU BHA#13, AL1 -0l drilling 0.0 78.2 04:39 05:39 assembly, 0.7" AKO w HYC A2 bit, bump up, set counters. 11/2/2018 11/2/2018 1.00 PROD2 STK TRIP P RIH, 78.2 7,091.0 05:39 06:39 11/2/2018 1112/2018 0.20 PROD2 STK DLOG P Tie into the Kl marker for -8' 7,091.0 7,122.0 06:39 06:51 correction 11/2/2018 11/212018 1.40 PROD2 STK DISP P Continue to RIH 7,122.0 7,730.0 06:51 08:15 Tag TOB @ 7730.4', PUH while displacing drilling mud to surface. 11/2/2018 11/2/2018 1.50 PROD2 STK KOST P Time mill off billet 7,730.0 7,732.2 08:15 09:45 CT 4305 psi @ 1.80 bpm in 1.80 bpm out, free pinn 1075 psi, CT WT 16.7 k lbs, WOB 0.4 klbs WH 275 psi IA 694 psi, OA 719 psi. 11/2/2018 11/2/2018 0.60 PROD2 STK KOST P Start targeting 0.5 k WOB, step up to 7,732.2 7,740.8 09:45 10:21 5, 10 and 15 fl,hr Page 14139 Report Printed: 11/20120181 Uperations Summary (with Timelog � .laths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Ttmo Log slmo"m SfalTme End line Dur (ho Plisse Op Code ACdW1Y Code 7Nie P-L% Op-dan ME) End Depth(XKB) 11/2/2018 11/2/2018 0.80 PROD2 DRILL DRLG P Drilling ahead 7,740.8 7,792.0 10:21 11:09 Ct Wt 13 k lbs, WOB 2 k lbs, ROP 100 fUhr Drill to 7790', PU Wt 41 k bs, PUH, slight over pull at bilet, 0.8 k lbs WOB RBIH, ddy drift, billet clean 11/2/2018 11/2/2018 0.80 PROD2 DRILL DRLG P OBD 7,792.0 7,891.0 11:09 11:57 CT Wt 13.6 k lbs, WOB1.6 k lbs, ROP 200 ft/hr 11/2/2018 11/2/2018 0.40 PROD2 DRILL WPRT P PU for DD wipers, dirty surveys and 7,891.0 7,891.0 11:57 12:21 threading the needle betwen AL1, PBI. Disscussed wtown, PUH and shot checkshot above billet. RBIH 11/2/2018 11/2/2018 1.00 PROD2 DRILL DRLG P CT 4451 psi, @ 1.81 bpm in, 1.80 7,891.0 8,046.0 12:21 13:21 bpm out, free spin diff 1205 psi, annular 3731 psi. CT 12.8 k lbs, WOB 2.1 k lbs, ROP 200 f/hr Average ROP over interval 155 11/2/2018 11/2/2018 0.80 PROD2 DRILL DRLG P Having dificulty getting turned down 8,046.0 8,074.0 13:21 14:09 PU 44 k lbs, RBIH slowly PU 39k lbs, RBIH slowly Time drill 11/2/2018 11/2/2018 1.70 PROD2 DRILL DRLG P PU Wt 38 k lbs, adjust rate back to 1.8 8,074.0 8,300.0 14:09 15:51 CT 4435 psi, 1.79 bpm in, 1.79 bpm out, free spin 1181psi, annular 3747 psi, WH 188 psi, IA 697, OA 760 CT 8.4 k lbs, WOB 2.4 k lbs, ROP 200 %hr. 11/2/2018 1112/2018 0.20 PROD2 DRILL WPRT P PU, 41 k lbs -1 kWOB coming off 8,300.0 7,764.0 15:51 16:03 bottom slight negWOB overpulls @ 7928, and 7780' 11/2/2018 11/2/2018 0.20 PROD2 DRILL WPRT P RBIH 7,764.0 8,300.0 16:03 16:15 SID @ 7764' and 7776' reduce pump rate and RIH 11/2/2018 11/212018 1.20 PROD2 DRILL DRLG P CT 4435 psi, 1.79 bpm in, 1.79 bpm 8,300.0 8,529.0 16:15 17:27 out, free spin 1193 psi, annular 3747 psi, WH 180 psi, IA 699, OA 780 CT 8.4 k lbs, WOB 2.4 k lbs, ROP 200 Mr. PU Wt 37 k lbs, adjust rate to 1.9 CT 4704 psi, 1.90 bpm in, 1.90 bpm out, free spin 1298 psi, annular 3732 psi, WH 150 psi CT 8.6 k lbs, WOB 2.2 k lbs, ROP 200 ft/hr. 11/2/2018 11/2/2018 1.60 PROD2 DRILL DRLG P OBD @ 228 fph, 1.9 bpm at 5,206 psi, 8,529.0 8,700.0 17:27 19:03 Diff--1,315 psi, WHP=36, BHP=3,805, IA=701, OA=800 11/2/2018 1112/2018 0.50 PROD2 DRILL WPRT P Wiper up hale with sweeps, PUW 35 k 8,700.0 7,760.0 19:03 19:33 11/2/2018 11/2/2018 0.45 PROD2 DRILL WPRT P Wiper back in hole, RIW 16 k 7,760.0 8,700.0 19:33 20:00 11/2/2018 11/2/2018 2.30 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 3,796 psi, 8,700.0 9,101.0 20:00 22:18 Diff=1,325 psi, WHP=166, BHP=3,809, IA=702, oA=806 11/2/2018 11/2/2018 1.10 PROD2 DRILL WPRT P Wiper up hole, PUW 39 k 9,101.0 7,360.0 22:18 23:24 1 11/2/2018 11/2/2018 0.20 PROD2 DRILL DLOG P Log RA marker correction of plus 2.0' 7,360.0 7,362.0 23:24 23:36 I Page 15139 ReportPrinted: 1112012018 Operations Summary (with Timelog L _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start Depth Sbd Time EndTM Dur(hr) Phare Op code actiWty Code Tine P -T-% Operation (W131 End Deph(WB) 11/2/2018 11/3/2018 0.40 PROD2 DRILL WPRT P Wiper back in hole, RIW 10 k 7,362.0 8,823.0 23:36 00:00 11/3/2018 11/3/2018 0.15 PROD2 DRILL WPRT P Continue wiper in hole, RIW 10 k 8,823.0 9,101.0 00:00 00:09 11/3/2018 11/3/2018 1.00 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,977 psi, 9,101.0 9,241.0 00:09 01:09 biff=1,360 psi, WHP=164, BHP=3,820, IA=700, OA=811 11/3/2018 11/3/2018 0.10 PROD2 DRILL WPRT P BHA Wiper PUW 45 k 9,241.0 9,241.0 01:09 01:15 11/3/2018 11/3/2018 1.75 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 5,109 psi, 9,241.0 9,455.0 01:15 03:00 Diff --1,367 psi, WHP=227, BHP=3,849, IA=701, OA=819 Note: New Mud at the bit 9,394' 11/3/2018 11/3/2018 0.34 PROD2 DRILL DRLG P PUH, obtain drilling parameters, 9,455.0 9,500.0 03:00 03:20 BOBD, 1.9 bpm at 4,698 psi, Diff -1,349, WHP=340, BHP=3,830, IA=698, OA=804 11/3/2018 11/3/2018 0.45 PROD2 DRILL WPRT P Wiper up hole 1000', PUW 39 k 9,500.0 8,500.0 03:20 03:47 11/3/2018 11 Y3/2018 0.40 PROD2 DRILL WPRT P Wiper back in hole, RIW 8,500.0 9,500.0 03:47 04:11 11/3/2018 1113/2018 1.90 PROD2 DRILL, DRLG P BOBD, 1.9 bpm at 4,489 psi, 9,500.0 9,773.0 04:11 06:05 Diff=1,130, WHP=387, BHP=3,846, IA=694, OA=771 Average ROP over interval 143 ft/hr 11/3/2018 11/3/2018 0.45 PROD2 DRILL WPRT P PU wt 42 k, crew change pick up, 9,773.0 9,773.0 06:05 06:32 1 1 1100' wiper, RBIH Wt 8.9 k lbs 11/3/2018 11/3/2018 0.60 PROD2 DRILL DRLG P CT 4650 psi @ 1.88 bpm in, 1.80 bpm 9,773.0 9,900.0 06:32 07:08 out, Free spin diff 1211 psi, Annular 3875 psi, 11.8 ppg @ the window WH 335 psi, IA 694 psi, OA 755 psi BOBD, CT Wt 0 k Ibs, WOB 1.34 k lbs, ROP 100-200 ft/hr Average ROP over interval ft/hr 211 11/312018 11/3/2018 OAO PROD2 DRILL WPRT P PU Wt 44 kwiper #2 9,900.0 8,896.0 07:08 07:32 11/3/2018 11/3/2018 0.40 PROD2 DRILL WPRT P RBIH Ct Wt 8,896.0 9,900.0 07:32 07:56 11/312018 11/3/2018 0.90 PROD2 DRILL DRLG P OBD 9,900.0 10,018.0 07:56 08:50 CT 5025 psi @ 1.88 bpm Free spin diff 1202 psi, CT Wt -1 k lbs, WOB 1. k lbs, ROP 100-200 ft/hr Average ROP over interval fVhr 131 11/3/2018 11/3/2018 0.40 PROD2 DRILL DRLG P DD having issue building angle, PU 10,018.0 10,068.0 08:50 09:14 and restart with lower pump rate, 1.53 bpm CT 5025 psi @ 1.88 bpm Free spin diff 1202 psi, CT Wt -1 k lbs, WOB 1. k lbs, ROP 100-200 R/hr Average ROP over interval ft/hr 125 11/3/2018 11/3/2018 0.80 PROD2 DRILL DRLG P Built angle. to 88°, PU 40 k lbs, 10,068.0 10,137.0 09:14 10:02 increase rate back to 1.9 CT 4878 psi, @ 1.88 bpm in, 1.86 bpm out, Annular 3898 psi, WH 271 psi, IA 695 psi, OA 776 psi CT Wt 4.8 k lbs, WOB 1 k Ilos, ROP 150 ft/min PU 10081, 44 k lbs Average ROP over interval ft/hr 86 Page 16139 ReportPrinted: 1112 0/2 01 8 ,aerations Summary (with Timelog L �)ths) 3H -13A • • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Slag Tme End line Orth Plwe Op Code ActlNT/Co Thee P -T -x Cpftaba M103) End Dep1h(fd(3) 11/3/2018 11/3/2018 1.70 PROD2 DRILL DRLG P Sudden dap in ROP @ 10137', drilling 10,137.0 10,265.0 10:02 11:44 break @ 10,140' CT 4878 psi, @ 1.88 bpm in, 1.86 bpm out, Annular 3898 psi, WH 271 psi, 1A 695 psi, OA 776 psi CT Wt -4.8 k lbs, WOB 1 k lbs, ROP 8 -150 ft/min PU's 10081, 44 k lbs 10138 48 k 10169 42 k 10185 43 k 10204 43 k 10230 46 k 10247 46k Pump 5x5, Average ROP over interval ft/hr 75 11/3/2018 11/3/2018 1.00 PROD2 DRILL WPRT P PU Wt 46 kwiper #3 10,265.0 7,360.0 11:44 12:44 Hole and billet clea on trip out of hole, returned 0.5 bbls solids 11/3/2018 11/3/2018 0.10 PROM DRILL DLOG P Tie into the RA tag for a +4' correction 7,360.0 7,381.0 12:44 12:50 11/3/2018 11/312018 1.80 PROM DRILL WPRT P Wiper back in hole, RIW 7,381.0 10,266.0 12:50 14:38 billet clean, Stack WOB to 4 k x4, PU's to -2 k lbs WOB from 8340-8390' Orient TF to as drilled, pump to min rate, and lower RIH speed to 30 ft/min, slid through. Hole otherwise clean to bottom. While increasing rate to 1.9 bpm, experienced 2 annular pressure events and pulled heavy 48 k lbs , packing off. Launched 5x5 sweep pulled up hole slowly pumping 1.9 bpm, pressures back to normal. lower pump rate to 1.7 bpm and attempt to RIH, no luck 11/3/2018 11/3/2018 0.40 PROD2 DRILL WPRT P PUH on 500' wiper while adding low 10,266.0 10,266.0 14:38 15:02 torqu to high and low vis pil pits as well as Alpine beads to Hi Vis Turn around @ 9776' RBIH 11/312018 11/3/2018 2.96 PROD2 DRILL DRLG P CT 4345 psi, @ 1.70 bpm in, 1.70 10,266.0 10,421.0 15:02 18:00 bpm out, Annular 3913 psi, WH 311 psi, IA IA 698, OA 789 CT Wt -4.9 k lbs, WOB 1.76 k lbs, PPU @ 10297', 52 k lbs Pumping sweeps 5x5 w beads in the hi -vis 11/3/2018 11/3/2018 4.20 PROD2 DRILL DRLG P Continue Drilling ahead with beaded 10,421.0 10,696.0 18:00 22:12 sweeps, 1.9 bpm at 4,420 psi, Diff -1,162 psi, WHP=244, BHP=3,938, IA=700, OA=813, PU's 35-45 k 11/3/2018 11/412018 1.80 PROD2 DRILL WPRT P TDAL1-01 Lateral, PUH 35 k, heistate 10,696.0 7,316.0 22:12 00:00 for sweeps to exit bit, POOH, launch and time out sweeps @ EOB and window, continue Wiper to the swab valve. 11/4/2018 11/4/2018 1.50 PROD2 DRILL WPRT P Continue wiper to the swab valve, 7,316.0 78.3 00:00 01:30 pumping 1.83 bpm at 4,725 psi, perform jog @ 1,071' - 1,453', - recovered some cavings across shaker, retrieve sample and upload picture to s:drive, continue wiper to surface Page 17139 ReportPrinted: 11120120181 „ aerations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log ShA Time EMTme Our (hn Phase Op fotle Activity Catle Time P -T -X Opaatlon Sfart Depth (fixe) Ertl nePth (IIKB) 11/4/2018 11/4/2018 0.20 PROD2 DRILL WPRT P Tag up at surface, reset counter 78.3 78.3 01:30 01:42 depths 11/4/2018 11/4/2018 0.20 PROD2 DRILL TRIP P —Daylight savings— 78.3 7,095.0 01:42 01:54 RIH to confirm TD 11/4/2018 11/4/2018 0.20 PROD2 DRILL DLOG P Log the KI correction of minus 9.5', 7,095.0 7,316.0 01:54 02:06 PUW 11/4/2018 11/4/2018 0.20 PROD2 DRILL CTOP P Perform Pressure Survey, Shutdown 7,316.0 7,316.0 02:06 02:18 mud pump, close choke 71' RKB to Sea Lvl 11.6 ppg ECD 3,595 psi Press Sensor (TVD) 5,947.88' 11/4/2018 11/4/2018 2.20 PROD2 DRILL WPRT T Continue IH, started taking CT weight 7,316.0 10,420.0 02:18 04:30 @ 8,392'(4k bobble) no pickup, continued IH, 9,045' set down, noticed packing off and pulling heavy (52k), worked pipe, continued back up hole to 8,000'. RBIH, fairly clean toward bottom, struggling to get back to bottom @ 10,420', pull wiper to the window. 11/412016 11/4/2018 2.20 PROD2 DRILL WPRT T Pull wiper to the window, PUW 45 k 10,420.0 7,360.0 04:30 06:42 Up down passes @ 10,268, 10135, 10107' -1 k WOB bobble @ 8348' 11/4/2018 11/4/2018 0.20 PROD2 DRILL DLOG T Tie int oth RA tag for +2' correcion 7,360.0 7,396.0 06:42 06:54 11/4/2018 11/4/2018 1.00 PROD2 DRILL TRIP T RBIH to confirm TD and lay in liner 7,396.0 9,720.0 06:54 07:54 running pill Encounter motor work in multiple spots, 8375, 9030, 9451, 9720' SID multiple times 9720', varied pump rate, running speed, and TF, PU's 45 k lbs fine fresh savings and lots of fine cuttings at the shaker, looks like we are drilling ahead at - 120 f7hr 11/4/2018 11/4/2018 1.80 PROD2 DRILL WPRT T Consult w engineering on path 9,720.0 7,280.0 07:54 09:42 forward, Roll into clean out mode, transfer liner running pill back to pit 6 KW and build 50 bbl's each to and hi vis, hi vis out of active mud to allow room for expected returns at surface. While building sweeps, PUH slowly, minor pack off events @ 9200, 9075, 9891', 8364' and pulled heavy at 8344' RBIH, 3 k WOB, PU, 35 k lbs, PUH Billet and window clean. ”"*additional 1.4 bbl's of cuttings returned since RBIH post swab wiper 11/4/2018 11/4/2018 1.60 PROD2 DRILL WPRT T Pump 5x5, chase to surface while 7,280.0 7,097.0 09:42 11:18 jagging coil from 6559 to 7275'. Some large rocks and a large amount of fine cavings returned to the shaker. Steady state of cavings that had been returning diminished significantly. Pumped additional 5x5, greatly diminished amount of targe rocks, only a couple versus 100's. 11/4/2018 11/4/2018 0.20 PROD2 DRILL DLOG T Tie into the Kt for a+3' correction. 7,097.0 7,112.2 11:18 11:30 Pago 18139 Report Printed: 1112012018 perations Summary (with Timelog . _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log start DW1h start Time btl Tme Ow (W) Phase tm cede A dy Cale Time P -T -X opwatlm (Poke) End Depth(X103) 11/4/2018 11/4/2018 1.40 PROD2 DRILL WPRT T RIH, window and build clean, pumping 7,112.2 10,699.0 11:30 12:54 1 bpm and running 50 ft/min. Some motor work @ 7776', 9432', and SID @ 10,290'. PU 40 k lbs. 11/4/2018 11/4/2018 0.30 PROD2 DRILL WPRT T PU, 38 k lbs, Stage pump to 1.9 bpm, 10,699.0 10,630.0 12:54 13:12 POOH slowly at rate chasing sweep out of open hole. Three annular pressure spikes with a sligh drop in out rate 38 bbls pumped. 11/4/2018 11/4/2018 1.00 PROD2 DRILL WPRT T Increase pulling speed to 50 fUmin, 10,630.0 7,863.0 13:12 14:12 POOH Stage sweeps for build and the window. neg WOB over pulls @ 9461' and 8377' with annular pressure spikes. 11/4/2018 11/4/2018 0.80 PROD2 DRILL WPRT T Baker coil Uac tools lost power, slow 7,863.0 7,718.0 14:12 15:00 pulling speed to 3 fUmin. Sweeps exiting early, Started to pack off and pull heavy @ 7779' Attempt to RIH, setting down at 7755' Pulling up to 50 k @ 7746. Work pipe, returns fluctuating. Pull past billet, full returns 11/4/2018 11/4/2018 0.80 PROD2 DRILL WPRT T Pull through build blind. No over pull 7,718.0 7,718.01 15:00 15:48 on CT WL Sweeps from the billet landed with a few rocks, mostly small cavings. Pumped 4 sweeps in cased hole, third and fourth clean. 11/4/2018 11/4/2018 2.75 PROD2 DRILL WORT T POOH, to surface without comms to 7,718.0 78.2 15:48 18:33 BHA' 11/4/2018 11/4/2018 1.00 PROD2 DRILL PULD T At surface, PUD failed drilling BHA 78.2 0.0 18:33 19:33 #13, unstab INJH, test a -line (good - test), slide cart back, hooked up test cable to BHA test tools (bad -test), continue PUD 11/4/2018 11/412018 1.15 PROD2 DRILL PULD T PD cleanout BHA #14 0.0 68.4 19:33 20:42 11/4/2018 11/4/2018 1.25 PROD2 DRILL TRIP T Tag up, reset counters, RIH w/BHA 68.4 7,090.0 20:42 21:57 #14 cleanout assembly with D331 and agitator. 11/4/2018 11/4/2018 0.20 PROD2 DRILL DLOG T Log the K1 marker correction of minus 7,090.0 7,124.0 21:57 22:09 8.5' — Note: End of BHI DT 11/4/2018 11/4/2018 0.45 PROD2 DRILL TRIP T Continue RIH lhm window, timeout 7,124.0 7,900.0 22:09 22:36 5x5 sweep, — Note: 7,733'-7,776' notice +2.2 k DHWOB 11/4/2018 11/4/2018 1.00 PROD2 DRILL WPRT T Pull wiper up to the tubing, PUW 36 k, 7,900.0 5,500.0 22:36 23:36 notice — Note: Minus 6.0 k pull @ 7,730' as DTF 11/42018 11/5/2018 0.40 PROD2 DRILL TRIP T Continue trip back in hole, RIW 14 k 5,500.0 7,646.0 23:36 00:00 11/5/2018 11/5/2018 0.55 PROD2 DRILL TRIP T Continue trip back in hole clean, RIW 7,646.0 9,000.0 00:00 00:33 14 k 11/5/2016 11/5/2018 1.00 PROD2 DRILL WPRT T Wiper up hole into the tubing, PUW 38 9,000.0 5,800.0 00:33 01:33 k, 7,763' minus 1.0 k, 8,983' minus 2.5 k Page 19139 Report Printed: 11120/20181 perations Summary (with Timelog . �pths) 3H -13A ..... Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log. Stan Depth S'tatt Tme Em1Tme Dr(hi) PhM Op cote Pcthly Cote Time P -T -x opemtm (tKa) End Dept, (Poe3) 11/5/2018 11/5/2018 0..25 PROD2 DRILL TRIP T RBIH 5,800.0 7,090.0 01:33 01:48 11/5/2018 11/5/2018 0.10 PROD2 DRILL DLOG T Log the K1 marker correction of plus 7,090.0 7,110.0 01:48 01:54 2.5' 11/5/2018 11/5/2018 1.70 PROD2 DRILL TRIP T Continue trip in hole, RIW 14 k, 7,730' 7,110.0 10,699.0 01:54 03:36 0.9 k, 9,450' 0.3 k, 10,251' 1.0 k, 10,400' 0.6 k, 10,470' setdown, PUH 38 k, RBIH, confirm TD 10,699', pump 10x10 sweep 11/5/2018 11/5/2018 1.80 PROD2 DRILL WPRT T PUH slowly notice annular pressure 10,699.0 10,465.0 03:36 05:24 swings, slowly work coil up hole, 10,465' pull heavy, turn around and are unable to move pipe, returns slowly deminished to zero. Counfinue to work pipe to establish returns. 11/5/2018 11/512018 7.10 PROD2 DRILL CTOP T Circulate 14.7 bbl of LVT down coil, let 10,465.0 10,465.0 05:24 12:30 soak, work pipe staging CT Wt up to 86 k Its, and -16 k lbs. Atempted various pump rates and dumped choke while pulling max. 11/5/2018 11/5/2018 3.50 PROD2 DRILL CTOP T Build 10 bbl 100 k LSRV Hi -vis pill, 10,465.0 10,465.0 12:30 16:00 displace down coil to open hole. Let sit static 1 hr. Open EDC. Stage pumps to 3 bpm, reduce WH to - 350 psi, no circulation. Diconnect from BHA, pump up to 2 bpm, Gyle pipe to 80 k - 15 k lbs. no movement CT depth 10461.6 to 10444.8" 11/5/2018 11/5/2018 2.00 PROD2 DRILL CTOP T Trapped WH of 660 psi, slowlyfalling, 10,465.0 10,465.0 16:00 18:00 11/5/2018 11/5/2018 1.40 PROD2 DRILL CTOP T Make up and confirm kill fluid is up to 10,465.0 10,465.0 18:00 19:24 weight 11.8 ppg, with added lubes 42 bbl, confirm 100 bbis of kill fluid without 11/5/2018 11/5/2018 0.65 PROD2 DRILL CTOP T Work pipe, unsuccessful 10,465.0 10,465.0 19:24 20:03 11/5/2018 11/5/2018 1.00 PROD2 DRILL CTOP T Pump kill 11.8 ppg kill fluid down back 10,465.0 10,465.0 20:03 21:03 side. 1,800 psi slowly dropping to 992 psi (65 bbls) 11/5/2018 11/5/2018 1.50 PROD2 DRILL CTOP T Pump additional 5 bbls while working 10,465.0 10,465.0 21:03 22:33 IpIpe-10k-+95k 11/5/2018 11/5/2018 0.50 PROD2 DRILL CTOP T Circulate 11.8 ppg tubed kill weight 10,465-.0 10,465.0 22:33 23:03 fluid down the coil @ 1.5 bpm 11/5/2018 11/5/2018 0.75 PROD2 DRILL CTOP T Monitor well for flow, work pipe twice 10,465.0 10,465.0 23:03 23:48 with no success. 11/5/2018 11/6/2018 0.20 PROD2 DRILL CTOP T Open 1x2 on pump in sub on RF, 10,465.0 10,465.0 23:48 00:00 monitor well for flow. 11/6/2018 11/6/2018 1.00 PROD2 DRILL CTOP T Fill hole, loss rate 1.2 bbls every hour. 10,465.0 10,465.0 00:00 01:00 SLB on location with hot -tap, run hand thru rig orientation. PJSM 11/6/2018 11/6/2018 0.40 PROD2 DRILL CTOP T PJSM with dg crew on pipe recovery, 10,465.0 10,465.0 01:00 01:24 no flow at surface 11/6/2018 11/6/2018 0.25 PROD2 DRILL CTOP T 41 k, (no flow) function closed Upper 10,465.0 10,465.0 01:24 01:39 and Lower 2 inch rams, manually lock rams. 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T line up and blow down riser to the pit 10,465.0 10,465.0 01:39 02:09 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T Install pipe slips, dog collar, and dog 10,465.0 10,465.0 02:09 02:39 collar, secure coil at stump 11/6/20111 11/6/2018 1.40 PROD2 DRILL CTOPT PJSM, (no -flow), install hot -tap, drill 10,465.0 10,465.0 02:39 04:03 hole into coil, monitor flow inside coil, flul d appears to be high -vis Page 20/39 Report Printed: 11/2 012 01 8 aerations Summary (with Timelog . pths) 3H -13A ConocoPhill , Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Star) Depth Start Time EMT -m_. Dpx(hr) Phase Op Code Ad yCode Time P -T -x Opmbon (Po®) End Depth (MM) 11/6/2018 11/6/2018 1.50 PROD2 DRILL CTOP T Remove hot -tap, cut coil above 87" 10,465.0 10,465.0 04:03 05:33 from rig floor, install a -line clamp. trim coil to obtain 20' of slack e4ine. 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T Install coil clamp, clean and organize 10,465.0 10,465.0 05:33 06:03 RF for changeout 11/6/2018 11/6/2018 6.40 PROD2 DRILL CTOP T Complete change out, discuss path 10,465.0 10,465.0 06:03 12:27 forward, lockout and cut wire at injector, install T bar, take control of wire at stump, Pull tension, remove lower wire clamp, cut additional tubing to allow space for roll bar to clear while skidding cart. "" note 80" max coil length to clear lower wire grab. Reattach lower wire clamp, skid cart and start installing spoolable connector on injector side of pipe. Install Tbar clamp to wire, RON (30 ton strain gauge) n tugger limited to 5k lbs. Pull tension on a -line, working up in 300 Ib increments up to 2700 lbs on the RON, confer with town engineer to pull overworking limit of cable (2700 lbs), and cable releases at 2950 lbs after-200'slack pulled from coil. Hanging weight of cable after release = 1000 lbs indicating that the cable released at the anchor. "147.3' of slack pulled** "Loss rate = 1 bbllhr" 11/6/2018 11/6/2018 1.00 PROD2 DRILL CTOP T SLB a -line on location, discuss plan 10,465.0 10,465.0 12:27 13:27 forward, conduct rig orientation and PJSM 11/6/2018 11/6/2016 1.50 PROD2 DRILL CTOP T Spot e -line unit outside rig and R/U 10,465.0 10,465.0 13:27 14:57 equipment to spool CDR3's a -line onto SLB's empty drum 11/6/2018 11/6/2018 1.75 PROD2 DRILL CTOP T Begin pulling a -line cable out of hole, 10,465.0 10,465.0 14:57 16:42 slow down and pull by hand -500 It from surface 11/6/2018 11/6/2018 1.00 PROD2 DRILL CTOP T E -line and anchor out of hole, RID e- 10,465.0 10,465.0 16:42 17:42 line, top off inside of coil with KWF, R/U scaffold 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T Fill coil w/11.8 ppg KWF 10,465.0 10,465.0 17:42 18:12 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T PJSM, with rig and SLB crews 10,465.0 10,465.0 18:12 18:42 11/6/2018 11/6/2018 0.40 PROD2 DRILL CTOP T Spot SLB a -line unit and whale next to 10,465.0 10,465.0 18:42 19:06 dg while installing BOT 5 -pitch CTC and pull test 25 k 11/6/2018 11/6/2018 3.00 PROD2 DRILL CTOP T RU a -line, 10,465.0 10,465.0 19:06 22:06 11/6/2018 11/6/2018 1.00 PROD2 DRILL CTOP T SLB eline heading up firing head. 10,465.0 10,465.0 22:06 23:06 11/6/2018 11/6/2018 0.40 PROD2 DRILL CTOP T Bring up tools from ground and space 10,465.0 10,465.0 23:06 23:30 out fast line sheave in mast. 11/6/2018 11/6/2018 0.30 PROD2 DRILL CTOP T PU/MU SLB drift (weight bar) 10,465.0 10,455.0 23:30 23:48 11/612018 11/7/2018 0.20 PROM DRILL CTOP T RIH, pumping 1.0 bpm @ 1,524 psi 10,465.0 10,465.0 23:48 00:00 250', POOH 11/7/2018 11/7/2018 2.00 PROM DRILL CTOP T PJSM, notify Caelus, COP Security, 10,465.0 10,465.0 00:00 02:00 and DSO radio silence 11/712018 11/7/2018 1.00 PROD2 DRILL CTOP T RIH, pumping 1.0 bpm tripping 150 10,465.0 10,465.0 02:00 03:00 I fpm towards bottom 8,050' Page 21139 Report Printed: 1112 012 01 8 ylerations Summary (with Timelog , aths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Time Endnme Our(h) Phase Op Code Amuily Cafe Time P -T -x Ope2tlon SWDOA (WB) EM Depth (W) 11/7/2018 11/7/2018 1.20 PROD2 DRILL CTOP T Pull up hole 7,980', SL PUW 946 k, 10,465.0 %465.0 03:00 04:12 hesitate for fluid movement, fire cutter, indication at surface of full function. RIH to 8,046', POOH 11/7/2018 11/7/2018 0.40 PROD2 DRILL CTOP T PJSM, LD cutter 10,465.0 10,465.0 04:12 04:36 11/7/2018 11/7/2018 3.50 PROD2 DRILL CTOP T RD, pump in sub, 2X2, and XO's, 10,465.0 10,465.0 04:36 08:06 install lifting sub onto 5 pitch CTC, lower traveling blocks, latch up 11/7/2018 11/7/2018 1.25 PROD2 DRILL CTOP T PJSM before pulling on tubing, PU to 10,465.0 10,465.0 08:06 09:21 42K string weight, open up lower pipe rams, open up bleeder valves to confirm zero pressure underneath upper pipe rams, open upper pipe rams and remove slips and dog collar, begin pulling tension on coil, 4 cycles at 60K, 3 cycles at 65K, 3 cycles at 70K, 3 cycles at 75K (60K on CTC due to weight of elevators), pipe still not free. Discuss with town engineer plan forward. 11/7/2018 11/7/2018 2.00 PROD2 DRILL CTOP T Decision made to pump down coil to 10,465.0 10,465.0 09:21 11:21 determine if there is circulation through the cut, bring string weight down to 41.5K, shut upper 2" pipe rams, set slips and dog collar, install XO from Baker lifting sub (2-3/8 8rd EUE to 1502), 2x2 valve. Valves too high to operate from scaffolding so decision made to take Baker lifting sub out of the rig -up to put valves at a safe working height. 11/7/2018 11/7/2018 0.50 PROD2 DRILL CTOP T Line up to pump down coil taking 10,465.0 10,465.0 11:21 11:51 returns through the drilling choke. Pump 3 bola at 0.3bpm/650psi, no returns, increase pump rate to 1 bpm/1300 psi and pump an additional 2 bbls for a total of 5 bbls 11.8 KWF, no returns seen at surface 1117/2018 11/7/2018 0.50 PROD2 DRILL CTOP T Prep rig floor for rigging up SLB a -line, 10,465.0 10,465.0 11:51 12:21 wait on e4me to show up on location after madatory 8 hour rest period. 11/7/2018 11/7/2018 0.75 PROD2 DRILL CTOP T Call for scaffold crew to move 10,465.0 10,465.0 12:21 13:06 scaffolding up 3' due to pipe stretch from pulling tension on coil 11/7/2018 11/7/2018 1.40 PROD2 DRILL CTOP T Make decision to work pipe some 10,465.0 10,465.0 13:06 14:30 more, build scaffold up 3', rig up baker lifting sub 11/7/2018 11/7/2018 1.00 PROD2 DRILL CTOP T Measure dg floor to bottom of CTC - 10,465.0 10,465.0 14:30 15:30 (91") prior to working pipe, latch up to liftig sub, open upper pipe rams, pull • slips and dog collar, work pipe 7 cycles between 75K and 25K, bring string weight back to 41.5K and measure distance to CTC (72"), indicating that we are still stuck. 11/7/2018 11/7/2018 1.20 PROD2 DRILL CTOP T Prep rig floor for a -line operations 10,465.0 10,465.0 15:30 16:42 11/7/2018 11/7/2018 1.50 PROD2 DRILL CTOP T PJSM, call for radio silence, RU and 10,465.0 10,465.0 16:42 18:12 a" cutter, 11/7/2018 11/7/2018 2.00 PROD2 DRILL CTOP T Bring cutter to the floor and MU quick 10,465.0 10,465.0 18:12 20:12 union Page 22139 ReportPrinted: 11120120181 aerations Summary (with Timelog . pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time log Start -rime FMTn !nd Plisse Op Code Ach*Cotte Tkne RTA Operation Stan Depth (Po(e) End Depth (WB) 11/7/2018 11/7/2018 0.75 PROD2 DRILL CTOP T RIH, come on line with pump 0.6 bpm 10,465.0 10,465.0 20:12 20:57 @ 1,209 psi, 1.0 bpm @ 1600 psi, 5 bbl away, noticed pressure spike to trip at 2,100 psi, shut down pump, check surface lines and line up, surface lines seems to be free, calculate vol from first cut depth (severing head) to top of Nabors CTC, 6.25 bbl, may be the 4" part of the severing head wedged Into the BHI upper quick float valves. 11/7/2018 11/8/2018 3.05 PROD2 DRILL CTOP T Continue RIH 100 fpm down to 7,335', 10,465.0 10,465.0 20:57 00:00 PUH and work wire down hole, pressure up in increments 1,000 psi/ bleed, 2,000 psi/bleed, 3,000 psi/bleed, and 4,000' psi/bleed, midnight depth 7,357'. 11/8/2018 11/8/2018 1.75 PROD2 DRILL CTOP T Continue to work aline down hole, 10,465.0 10,465.0 00:00 01:45 pressure up and bleed off, working in stages 1,000 psi, 2,000 psi, 3,000 psi, 4,000 psi, unable to move down hole further, phone town team, decision was made to perfrom cut @ 7,357' 11/8/2018 11/8/2018 2.00 PROD2 DRILL CTOP T After cut, unable to move up or down 10,465.0 10,465.0 01:45 03:45 hole with e -line, bring pump up 0.59 bpm at 549 psi returns to surface, worked aline, still unable to move up or down, increase pump rate up to 1.7 bpm at 1,130 psi, pulled eline tools free, continue POOH 11/8/2018 11/8/2018 1.25 PROD2 DRILL CTOP T At 200', call for radio silence, PJSM, 10,465.0 10,465.0 03:45 05:00 LD SLB cutter, RD equipment from cut end of coil 11/8/2018 1118/2018 1.00 PROD2 DRILL CTOP T Bring blocks down and attach to lifting 10,465.0 10,465.0 05:00 06:00 sub 11/8/2018 11/812018 1.00 PROD2 DRILL CTOP T Latch onto lifting sub, open pipe rams, 10,465.0 7,357.0 06:00 07:00 remove slips and dog collar, PU -20' at 37K holding steady, appear to have .. a goad cut, set back down to original depth and set pipe rams, slips, and dog collars 11/8/2018 11/8/2018 3.50 PROD2 DRILL CTOP T Release SLB a -line, RD equipment 7,357.0 7,357.0 07:00 10:30 from cut end of coil, trim coil and dress stump end for spoolable CTC, make up to spoolable connector on injector and downhole side of coil 11/8/2018 11/8/2018 0.50 PROD2 DRILL CTOP T Stab on with injector, test packoffs, 7,357.0 7,357.0 10:30 11:00 pull test connector to 25K 11/8/2018 11/8/2018 1.00 PROM DRILL CTOP T POOH slowly 1.5 fpm 30K watch for 7,357.0 7,000.0 11:00 12:00 spoolable connector coming through injector, over horses head, and get 3 wraps on reel with connector 11/8/2018 11/8/2018 2.35 PROD2 DRILL CTOP T Continue POOH slowly at 80 fpm, 7,000.0 500.0 12:00 14:21 pumping across the top to keep hole full 11/8/2018 11/8/2018 0.65 PROD2 DRILL CTOP T Flow check, confirm well is dead 500.0 500.0 14:21 15:00 11/8/2018 11/8/2018 0.90 PROD2 DRILL CTOP T Break riser, POOH at 20 fpm until cut 500.0 0.0 15:00 15:54 is seen at surface, cut looks good 11/8/2018 11/8/2018 0.50 PROD2 DRILL CTOP T Stab back on with injector, conduct 0.0 0.0 15:54 16:24 PJSM with HAL N2 for reel blowdown, come online with Nitrogen at 1500 scf/min for 8 minutes (11000 self N2 total), observed 15 We of KWF returns to the Tiger Tank Page 23139 Report Printed: 11120120181 aerations Summary (with Timelog , pths) AM% 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Depth waif. Er,d Tine Oerlhd Phase Op code Advay code Tore P -T -x oPer�un W) PW) FsdOrou, tniar) 11/8/2018 11/812018 1.50 PROM DRILL CTOP T Bleed down N2 from coil and surface 0.0 0.0 16:24 17:54 liines, RD Hal. N2, unstab INJH, install clamp onto free end of coil, skid cart back 11/8/2018 11/8/2018 0.50 PROD2 DRILL CTOP T Cleanup and organize RF 0.0 0.0 17:54 18:24 11/8/2018 11/8/2018 1.20 PROD2 DRILL CTOP P Grease all equipment and fluid pack 0.0 0.0 18:24 19:36 1 1 1 all lines. Prep RF for testing 11/8/2018 11/8/2018 1.00 PROD2 DRILL CTOP P Obtain shell test, swab leaking by, 0.0 0.0 19:36 20:36 phone out Valve crew, service wellhead valves. 11/8/2018 11/9/2018 3.40 PROM DRILL BOPE P Start BOP test, Witness waived by 0.0 0.0 20:36 00:00 Guy Cook, November 08, 2018 @ 15:14 pm, 250 psi low/4,800 psi High/2,500 psi Annular, Test #8 midnight ••* Sim -ops: Dress and install graple into free end of coil, remove and pin out counters 11/9/2018 11/9/2018 3.00 PROD2 DRILL BOPE P Continue BOP test, Witness waived by 0.0 0.0 00:00 03:00 Guy Cook, November 08, 2018 @ 15:14 pm, 250 psi low/4,800 psi High/2,500 psi Annular, Test #8 - 14 •" Sim -ops: remove inner reel iron 11/9/2018 11/9/2018 0.50 PROD2 DRILL BOPE P Test #14-15, perform drawdown test 0.0 0.0 03:00 03:30 (7.0 hr test) 11/9/2018 11/9/2018 4.00 PROD2 DRILL CTOP T Continue Reel Swap, remove 0.0 0.0 03:30 07:30 counters, rig down inner reel iron and bulkhead, install grapple 11/9/2018 11/9/2018 2.50 PROD2 DRILL CTOP T Pull lest grapple, PJSM for 0.0 0.0 07:30 10:00 unstabbing, unstab coil tubing 11/9/2018 11/9/2018 1.25 PROD2 DRILL CTOP T Position reel, RU shackles and slings, 0.0 0.0 10:00 11:15 remove saddle clamps, open back doors 11/9/2018 11/9/2018 1.00 PROD2 DRILL CTOP T Load old reel onto Peak truck, pick up 0.0 0.0 11:15 12:15 reel #52348 and load onto rig 11/9/2018 11/9/2018 6.75 PROD2 DRILL CTOP T position and secure new reel, install 0.0 0.0 12:15 18:00 new stripper brass, install inner reel iron, make up and pull test grapple 11/9/2018 11/9/2018 2.50 PROD2 DRILL CTOP T Crew Change, PJSM, install new 0.0 0.0 18:00 20:30 stripper and secure to INJH, inspect, adjust, and secure inner reel iron 11/9/2018 11/9/2016 1.50 PROD2 DRILL CTOP T Install and pull test grapple, re -tighten 0.0 0.0 20:30 22:00 grapple, remove all banding and shipping material from reel 11/9/2018 11/9/2018 1.25 PROD2 DRILL CTOP T PJSM, stab coiled tubing into INJH 0.0 0.0 22:00 23:15 11/9/2018 11/10/2018 0.75 PROD2 DRILL CTOP T Prep free end of coiled tubing for CTC 0.0 0.0 23:15 00:00 installation Sim -ops: PJSM, blow air thru CSL, RU little red services to CSL, 11/10/2018 11/10/2018 0.80 PROD2 DRILL CTOP T Continue MU new coiled tubing 0.0 0.0 00:00 00:48 _ reel.load 5 bbl of meothonal into reel, dress free end of coiled tubing for CTC, pull test 35 k (good -test) 11/10/2018 11/10/2016 1.00 PROD2 DRILL CTOP T Head up BHI upper quick connect, 0.0 0.0 00:48 01:48 (good -test), >2000/65. install nozzle 11/10/2018 11/10/2018 2.00 PROD2 DRILL CTOP T Slide cart forward, stab onto stump, 0.0 0.0 01:48 03:48 follow meothanol with fresh water, taking returns to kill tank. Page 24139 Report Printed: 11120/2018 perations Summary (with Timelog . _pths) 3H -13A ConocoPhillips Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log nd De see �°� start rave End rase Dar(hr) Phase DP code Acta code Activity rare P -T -x Dparatlan End Depthlsl9l) 11/10/2018 11/10/2018 1.20 PROD2 DRILL CTOP T Line up to test inner reel valve and 0.0 0.0 0348 05:00 pac-off 250 psi low/4,800 psi high 11/10/2018 11/10/2018 2.50 SLOT WELLPR PULD T PU/MU cleanout BHA#15 0.0 62.4 05:00 07:30 11/10/2018 11/10/2018 1.55 SLOT WELLPR TRIP T RIH with cleanout BHA#15, pumping 62.4 7,060.0 07:30 09:03 11.8 KWF at 1 BPM IA/OA= 657psi/509psi 11/10/2018 11/10/2018 0.15 SLOT WELLPR DLOG T Log K1,+19'correction 7,060.0 7,088.0 09:03 09:12 11/10/2018 11/10/2018 0.30 SLOT WELLPR TRIP T Continue to RIH, Wt Chk at 7100'= 7,088.0 7,340.0 09:12 09:30 30K, slow down and turn around at 7340', did not stack out on whipstock or stuck end of coil 11/10/2018 11/10/2018 1.50 SLOT WELLPR CIRC T PUH to new TOWS depth 7315'and 7,340.0 7,315.0 09:30 11:00 displace well to 8.6 ppg Power Pro 11/10/2018 11/10/2018 2.00 SLOT WELLPR CIRC T On bottom, recip pipe and clean hole 7,315.0 7,315.0 11:00 13:00 pumping 1.8 BPM, drop rate to 1.6 BPM for 15 minutes to calibrate choke, continue to recip pipe while building sweeps in mud pits, circ=3800 psi diff -400 psi IA=669 OA=569 11/10/2018 11/10/2018 2.25 SLOT WELLPR CIRC T POOH pumping with 1.8 BPM, making 7,315.0 62.4 13:00 15:15 multiple jogging passes and pumping three 5x5 sweeps 11/10/2018 11/10/2018 1.60 SLOT WELLPR PULD T PUD BHA#15, WHP=775 psi 62.4 0.0 15:15 16:51 11/10/2018 11/10/2018 1.30 PROM RPEQPT PULD T PD, WS setting BHA 0.0 73.6 16:51 18:09 11/10/2018 11/10/2018 1.50 PROD1 RPEQPT TRIP T RIH, with WS settling BHA#16, 3-112" 73.6 7,090.0 18:09 19:39 Monobore XL Whipstock 11/10/2018 11/10/2018 0.20 PROD? RPEQPT DLOG T Log the K1 marker correction of minus 7,090.0 7,128.8 19:39 19:51 6.0' 11/102018 11/10/2018 0.20 PROD1 RPEQPT DLOG T Continue IH to setting depth, close 7,128.8 7,325.5 19:51 20:03 EDC 11/10/2018 11/102018 0.15 PROD1 RPEQPT DLOG T 7,315', (Anchor @ 0" HS), PUW 35 k, 7,325.5 7,315.0 20:03 20:12 RBIH to setting depth, PUW 32 k, bring pump up to shear 5,400 psi, set down 5.5 k DHWOB, PUW 35 k 11/10/2018 11/1012018 1.50 PROD? RPEQPT TRIP T POOH, pumping 1.2 bpm at 2,775 psi 7,315.0 73.6 20:12 2142 11110/2018 11/10/2018 1.00 PROD1 RPEQPT PULD T PUD, WS setting tools 73.6 0.0 21:42 22:42 11/102018 11/11/2018 1.30 PROD1 WHPST PULD T PD, Window milling assembly 0.0 74.3 22:42 00:00 11/11/2018 11/11/2018 1.40 PROD1 WHPST TRIP T RIH, w/window milling assembly 0.6" 74.3 7,090.0 00:00 01:24 ako motor, re -run string reamer (run#6) 2.80"OD and new DSM 2.80"OD 11/11/2018 11/112018 0.20 PROD1 WHPST DLOG T Log the Kl marker correction of minus 7,090.0 7,128.0 01:24 01:36 16.5' 11/11/2018 11/112018 0.30 PROD1 WHPST TRIP T Continue IH 7,128.0 7,315.0 01:36 01:54 11/11/2018 11/11/2018 0.10 PROD1 WHPST WPST T Dry tag TOWS @ 7,315', PUW 35 k 7,315.0 7,315.0 01:54 02:00 11/112018 11/11/2018 5.00 PROD1 WHPST WPST T Bring pump online @ 1.7 bpm @ 7,315.0 7,318.0 02:00 07:00 4,056 psi, Diff --530, WHP=325, BHP=3,651, IA=659, OA=533 11/11/2018 11/11/2018 2.00 PROM WHPST WPST T Continue milling window @ 1.9 7,318.0 7,321.0 07:00 09:00 BPM/4120 psi, WHP=310 psi, Diff -650 psi, BHP=3630 psi, IA/OA=6831632, WOB=1500 lbs Page 25139 ReportPrinted: 11120/2018 -perations Summary (with Timelog , .pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Syed Depth Stert Tme E Tme Dw(t) Phase op code AC1K*GDde Tine P-T-X ope211m (WB) End Depth 0") 11/11/2018 11/11/2018 1.75 PROD1 WHPST WPST T Continue milling window @ 1.9 71321.0 7,325.0 09:00 10:45 BPM/4020psi, WOB drops to 1030 lbs, T/1/0=313/690/669, Diff--6110, BHP=4245 11/11/2018 11/11/2018 2.00 PROD1 WHPST WPST , T Through window, mill 11' of rathole. 7,325.0 7,336.0 10:45 12:45 1.9BPM, circ=4200psi, Diff=750psi, WOB=23001bs, BHP=4400p5i, T/1/0=337/692/688 11/11/2018 11/11/2018 2.40 PROD1 WHPST REAM T Dress window, make 5 reaming 7,336.0 7,315.0 12:45 15:09 passes at 1 fpm, 2 at as drilled TF, 30' ROHS, 30° LOHS, and 180° ROHS, come offline with pumps and dry drift window, clean. 11/11/2018 11/11/2018 1.60 PROD1 WHPST TRIP T Open EDC and POOH pumping 1.9 7,315.0 74.3 15:09 16:45 BPM 11/11/2018 11/11/2018 1.25 PROD1 WHPST PULD T At surface, spaceout, PUD milling 74.3 0.0 16:45 18:00 BHA#17 "` Note: Mills gauged 2.80 no-go 11111/2018 11!11/2018 1.00 PROD1 DRILL PULD T PD, pre-loaded Build assembly 0.0 72.2 18:00 19:00 11/11/2018 11/11/2018 130 PROD1 DRILL TRIP T Tag up, reset counters, RIH wl Build 72.2 7,080.0 19:00 20:18 BHA#18, 2.5° ako, P104 bi-center bit 11/11/2018 11/11/2018 0.20 PROD1 DRILL DLOG T Log the K1 marker correction of minus 7,080.0 7,108.3 20:18 20:30 5.5' 11/11/2018 11/11/2018 0.30 PROD1 DRILL TRIP T Continue IH to bottom, close EDC, 7,108.3 7,336.0 20:30 20:48 PUW 36 k 11/11/2018 11/11/2018 0.70 PROD1 DRILL DRLG T - OBD, 1.9 bpm at 4,100 psi, Diff-600 7,336.0 7,423.0 20:48 21:30 psi, BHP--3,710, WHP=335, IA=691, OA=638 11/11/2018 11/11/2018 0.20 PROD1 DRILL WPRT T Short wiper up hole, PUW 37 k 7,423.0 7,090.0 21:30 21:42 11/11/2018 11/11/2018 0.20 PROD1 DRILL DLOG T Log the K1 marker no correction, 7,090.0 7,335.0 21:42 21:54 continue IH log the RA marker, PUW 37 it - Note: Offical Window Depths TOWS=7,315' BOW=7,320' RA Marker-7321' 11/11/2018 11/11/2018 0.20 PROD1 DRILL WPRT T Continue IH 7,335.0 7,423.0 21:54 22:06 11/11/2018 11/12/2018 1.90 PROD1 DRILL DRLG T BOBO, 1.9 bpm at 4,086 psi, Ditf=515 7,423.0 7,616.0 22:06 00:00 psi, WHP=298, BHP=3,706, IA=694, OA=673 11/12/2018 11/12/2018 2.20 PRODt DRILL DRLG T OBD, 1.9 bpm at 4,181 psi, DlfF=530 7,616.0 7,760.0 00:00 02:12 psi, WHP=323, BHP=3,666, IA=688, OA=649 "` Note: New mud at the bit @ 7,620' 11/12/2018 11/12/2018 1.50 PROD? DRILL TRIP T POOH 7,760.0 78.3 02:12 03:42 11/12/2018 11/12/2018 1.25 PROW DRILL PULD T At surface, space out, PUD build 78.3 0.0 03:42 04:57 assembly 11/12/2018 11/12/2018 1.25 PROD1 DRILL PULD T Make up and PD AL1 lateral drilling 0.0 78.3 04:57 06:12 BHA#19 11/12/2018 11/12/2018 1.50 PROD1 DRILL TRIP T RIH 78.3 7,073.0 06:12 07:42 11/12/2018 11/12/2018 0.20 PROD1 DRILL DLOG T Log K1, -7.5' correction 7,073.0 7,117.0 07:42 07:54 11/12/2018 11/12/2018 0.30 PROD1 DRILL TRIP T wt check @7100'=34K, continue to 7,117.0 7,760.0 07:54 08:12 RIH to build TO Page 26139 ReportPrinted: 1112012018 e Aerations Summary (with Timelog , pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM Depth Shut'rim Ennrme Our(hd Phase Op code AMWy cone Time P-T-X operation (111(8) End Depth(MB) 11/12/2018 11/12/2018 0.40 PROM DRILL DRLG T Record free spin, diff--1671 psi, reset 7,760.0 7,827.0 08:12 08:36 WOB and tag build TD at 7660', drill ahead, WOB=2700 lbs, Diff=1820 psi, circ=5546 psi, BHP=5734 psi, T/1/0=336/681/552, wt check @7764'=35K 11/12/2018 11/12/2018 0.20 PROD1 DRILL WPRT T Returns drop off to 0.4 BPM (pumping 7,827.0 7,804.0 08:36 08:48 1.9 BPM), PUH to 7804' PUW=35K 11/12/2018 11/12/2018 0.10 PROD1 DRILL WPRT T RBIH 7,804.0 7,827.0 08:48 08:54 11/12/2018 11/12/2018 0.10 PROM DRILL DRLG T OBD, lose returns ay 7864' 7,827.0 7,864.0 08:54 09:00 11/1212018 11/1212018 0.10 PROM DRILL WPRT T Pick up to above 7827'to lel losses 7,864.0 7,827.0 09:00 09:06 heal, PUW=39K 11/12/2018 11/1212018 0.10 PROM DRILL WPRT T RBIH 7,827.0 7,864.0 09:06 09:12 11/12/2018 11/12/2018 0.10 PROD1 DRILL DRLG T OBD, plan forwipers to end of build 7,864.0 7,900.0 09:12 09:18 every 100' 11/12/2018 11/12/2018 0.05 PROD1 DRILL WPRT T Wiper to EOB, PUW=38K 7,900.0 7,772.0 09:18 09:21 11/12/2018 11/12/2018 0.05 PROM DRILL WPRT T RBIH 7,772.0 7,900.0 09:21 09:24 11/12/2018 11/12/2018 0.60 PROD1 DRILL DRLG T OBD, WOB=16001bs, circ=5440 psi, 7,900.0 8,000.0 09:24 10:00 diff--1850 psi, BHP=5600 psi, T/110=310/684/588 11/12/2018 11/1212018 0.10 PROM DRILL WPRT T Wiper trip to End of Build, PUW=38K 8,000.0 7,766.0 10:00 10:06 11/12/2018 11/12/2018 0.10 PROM DRILL WPRT T RBIH 7,766.0 8,000.0 10:06 10:12 11/1212018 11/12/2018 3.50 PROD1 DRILL DRLG T OBD, performing BHA wipers every 8,000,0 8,400.0 10:12 13:42 100' drilled, 1.9 BPM @ 5512 psi, Diff-2035 psi, BHP=5755 psi, T/110=3071667/602, WOB=2520 lbs, PUW=37K@8100', 37K@8200', 40K@8358- 11/12/2018 11/12/2018 0.25 PROM DRILL WPRT T Wiper trip to EOB 7770', PUW=40K 8,400.0 7,770.0 13:42 13:57 11/12/2018 11/12/2018 0.35 PROM DRILL WPRT T RBIH, set down 1400 lbs WOB at 7,770.0 8,400.0 13:57 14:18 8300' MD (near end of high GR section), PU 10' and RBIH no problem 11/12/2018 11/12/2018 3.00 PROD1 DRILL DRLG T OBD at 1.9 BPM/5634 psi, 8,400.0 8,810.0 14:18 17:18 WOB=2510 lbs, Diff-1951 psi, BHP=5731 psi, T/1/0=277/6971673, pull BHA wipers every 100'. PUW's=37K@8505', 38K@8600', 38K@8700- 11112/2018 11/12/2018 0.87 PROD1 DRILL WPRT T Wiper up hole to the window, PUW 38 8,810.0 7,336.0 17:18 18:10 k 11/12/2018 11/12/2018 0.20 PROM DRILL DLOG T Log the RA marker correction of plus 7,336.0 7,363.0 18:10 18:22 2.5' 11/12/2018 11/1212018 0.65 PROD1 DRILL WPRT T Wiper back in hole, RIW 10 k, 8,200' 7,363.0 8,749.0 18:22 19:01 notice pump (bore) pressure climbing, continue IH, attempt to bring pump rate up to drilling rate, 1.53 bpm at 2000 psi Diff. 11/12/2018 11/12/2018 2.80 PROD1 DRILL TRIP T POOH, to inspect BHA(agitator), 8,749.0 78.2 19:01 21:49 performing Jog above window, and @ 1,990' (700'), Page 27139 ReportPrinted: 11120/2018 Aerations Summary (with TimelOg L pths) 3H-13A • • 616- Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stmt Depth SIM Time End Tme Our Qtr) Phase Op Code ACW*Code Uhe P-LX Operation Qs®) End Depth lPo(a) 11/12/2018 11112/2018 1.69 PROD1 DRILL PULD T At surface, space out, PUD drilling 78.2 0.0 21:49 23:30 BHA#19 - Note: Found Lower Bearing housing on mud motor had backed completly off. 11/12/2018 11/13/2018 0.49 PROW DRILL PULD T PD, All lateral drilling BHA#20 0.0 78.2 23:30 00:00 11/13/2018 11/13/2018 1.00 PROD1 DRILL PULD T Finish PD lateral drilling BHA #20 78.2 78.2 00:00 01:00 11/13/2018 11/132018 1.60 PROD1 DRILL TRIP T RIH, with AL1 lateral drilling BHA#20, 78.2 7,090.0 01:00 02:36 0.5° ako, RR bi-center bit, surface test agitator@ 517'(good-test) 11/13/2018 11/132018 0.20 PROD1 DRILL DLOG T Log the K1 correction of minus 5.5', 7,090.0 7,128.0 02:36 02:48 PUW 37 k '"' Note: 7.5 hrs NPT (BHI) 11/13/2018 11/13/2018 0.65 PROD1 DRILL TRIP T Continue IH, setting down @ 8,228', 7,128.0 8,296.0 02:48 03:27 PUW 38 k, lower pump rate RBIH, clean pass spot brought pump back up to 1.5 bpm, set down again at DTF 8,296', PUW 50k, -6 k DHWOB, continued up hole, seeing drag -1.1 k- 3.2 k, 11/13/2018 11/13/2018 1.20 PROD1 DRILL WPRT T Continue PUH, pumping bottoms up, 8,296.0 7,605.0 03:27 04:39 sand in sample (no-rocks), make call to TT. 11/13/2018 11/13/2018 0.30 PROD1 DRILL WPRT T RBIH to 8,200', line up and pump 5x5 7,605.0 8,200.0 04:39 04:57 sweep hi/low 11/132018 11/13/2018 1.00 PROD1 DRILL WPRT T Chase sweep to surface 8,200.0 5,500.0 04:57 05:57 11/13/2018 11(1312018 1.20 PROD1 DRILL TRIP T RBIH, log K1 +2' correction, set down 5,500.0 8,254.0 05:57 07:09 @ 8222' WOB=2K PUW=38K, pull up 50' and RIH, set down @ 8254' WOB=3.1 K PUW=38K, pick up 100' and RIH again, set down @ 8212' WOB=3.5K PUW=45K, pick up 40' and RBIH, set down @ 8245' WOB=2.6K PUW=38K 11/13/2018 11/132018 0.30 PROW DRILL WPRT T PUH and confer with Town Engineer 8,254.0 7,342.0 07:09 07:27 11/1312018 11/13/2018 0.20 PROD1 DRILL WPRT T RBIH to a cleanout depth of 8100' 7,342.0 8,100.0 07:27 07:39 - 11/132018 11/132018 3.20 PROD1 DRILL WPRT T Cleanout hole from 8100' pumping 8,100.0 78.2 07:39 10:51 5x5 sweeps and making multiple jogs in on way out of hole, HOT tool cutting out on way out of hole, will inspect at surface and run new BHA 11/1312018 11/132018 1.10 PROD1 DRILL PULD T Tag up, PUDALl lateral drilling BHA 78.2 0.0 10:51ill: 57 #20 11/13/2018 11/132018 1.50 PROD1 STK PULD T Make up and PD aluminum billet 0.0 73.4 11:57 13:27 WOH Anchor BHA #21 11/13/2018 11/13/2018 1.40 PROD? STK TRIP T RIH with BHA#21 @ 80 fpm WEDC in 73.4 7,054.0 13:27 14:51 Open position, slow down through window, build, and openhole sections 11/13/2018 11/132016 0.20 PROD1 STK DLOG T Log K1, -7' cormc0on 7,054.0 7,120.0 14:51 15:03 11/13/2018 11/13/2018 0.40 PROD1 STK TRIP T RIH to 8011.78' and pull slack out of 7,120.0 8,011.8 15:03 15:27 coil to set Top of Billet at 8000' Page 28139 ReportPrinted: 1112012018 e aerations Summary (with TimelOg L dths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sean Depth San Tme End Res D, (hr) Phase Op Cade Pcbtlty CmIe Tire P -T -X operelim (IBS End Dep1h(RKB) 11/13/2018 11/13/2018 0.20 PROD1 STK WPST T PUW=34K pre-set, close EDC and 8,011.8 8,011.8 15:27 15:39 come online w/pumps, sheared at 5166 psi / 1.2 BPM (Diff -1500 psi), set down 3600 lbs to confirm Openhole Anchored Billet is set. 11/13/2018 11/1312018 1.50 PROD1 STK TRIP T POOH 8,011.8 61.7 15:39 17:09 11/13/2018 11/13/2018 2.00 PROD1 STK PULD T PUD, setting tools, crew change, 61.7 0.0 17:09 19:09 PJSM, swap out tools, PU motor and agitator, LD MWD tool, PU Res tool, MU HOT-FVS, scribe to motor. 11/13/2018 11/13/2018 1.00 PROD1 STK PULD T PD, kickoff/drilling BHA, MU to upper 0.0 78.3 19:09 - 20:09 quick, surface test (goad -test), MU INJH, tag up, re -set counter depths, check pac-offs (good) 11/13/2018 11/13/2018 1.25 PROD1 STK TRIP T RIH, w/kickoff/drilling BHA# 22, 78.3 7,090A 20:09 21:24 "' Note: Test agitator 1.5 bpm @ 4,141 psi, and 1.9 bpm @ 5,100 psi 11/13/2018 11/13/2018 0.20 PROD1 STK DLOG T Log the K1 marker correction of minus 7,090.0 7,128.0 21:24 21:36 1 1 7.5', PUW 34 it 11/13/2018 11/13/2018 0.50 PROD1 STK TRIP T Continue IH, dry tag TOB @ 8,000', 7,128.0 8,000.0 21:36 22:06 2.5k DHWOB, PUW 35 it 11/13/2018 11/1312018 0.13 PROD1 STK KOST T PUH, obtain ddlliing parameters, 1.9 8,000.0 7,999.0 22:06 22:13 bpm at 5,082 psi, Diff -1,215 psi, WHP=256, BHP=3,725, IA=698, OA=645 11/13/2018 11/13/2018 0.80 PRODt STK KOST T Kickoff billet @ time drilling @ 1 ff/hr 7,999.0 8,000.2 22:13 23:01 11/13/2018 11/13/2018 0.60 PROD1 STK KOST T Kickoff billet @ time drilling @ 2 ft/hr 8,000.2 8,001.2 23:01 23:37 11/13/2018 11/13/2018 0.20 PROD1 STK KOST T Kickoff billet @ time drilling @ 3 ftlhr 8,001.2 8,001.9 23:37 23:49 11/13/2018 11/14/2018 0.17 PROD1 DRILL DRLG T Drill ahead @ 1 k DHWOB 8,001.9 8,011.0 23:49 00:00 11/14/2018 11114/2018 0.67 PRODt DRILL DRLG T Drilling Ahead, 1.9 bpm at 5,082 psi, 8,011.0 8,124.0 00:00 00:40 Diff --1,215 psi, WHP=189, BHP=3,748, IA=698, OA=648 - DHWOB=2.0 k CTSW=11.0 k 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T PUH, dry drift kickoff point (clean) , 8,124.0 7,970.0 00:40 00:46 PUW 35 k 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T wiper back in hole, RIW 12 k 7,970.0 8,124.0 00:46 00:52 11/14/2018 11/1412018 1.30 PROD1 DRILL DRLG T OBD, 1.9 bpm at 5,115 psi, Diff=1,215, 8,124.0 8,350.0 00:52 02:10 WHP=213, BHP=3,747, IA=698, OA=649 DHWOB=1.9-2.4 k CTSW=8-12 k 11/14/2018 11/14/2018 0.20 PRODt DRILL WPRT T Wiper up hole, PUW 38 k 6,350.0 8,080.0 02:10 02:22 11/14/2018 11/14/2018 0.20 PROD1 DRILL WPRT T Wiper back in hole, RIW 12 it 8,080.0 8,350.0 02:22 02:34 11/14/2016 11/14/2018 1.35 PROD1 DRILL DRLG T BOBD, 1.9 bpm at 4,962 psi, 8,350.0 8,550.0 02:34 03:55 Diff=1,155 psi, WHP=210, BHP=3,789, IA=701, OA=671 DHWOB=2.5 it CTSW=9.0 k Page 29139 ReportPrinted: 11/20120181 perations Summary (with Timelog , .pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slat Time End T ine MrM Ruse l)p CaEe ActirNy Cafe Time P -T -X OperaEwt) Stan Depth End Osptll ptl®) 11/14/2018 11/14/2018 0.15 PRODt DRILL WPRT T 100' Wiper up hole, PUW 40 k 8,550.0 8,550.0 03:55 04:04 11/14/2018 11/1412018 1.50 PROD1 DRILL DRLG T OBD, 1.9 bpm at 5,114 psi, 8,550.0 8,780.0 04:04 05:34 BHP=3,787, WHP=207, IA=702, OA=671 DHWOB=2.1 k CTSW=8.0 k 11/14/2018 11/1412018 0.30 PROD1 DRILL WPRT T Wiper up hole, PUW 35K 8,780.0 8,035.0 05:34 05:52 11/14/2018 11/14/2018 0.20 PROD1 DRILL WPRT T Wiper back in hole, RIW 12K 8,035.0 8,780.0 05:52 06:04 11/14/2018 11/14/2018 0.70 PROD1 DRILL DRLG T BOBO, 1.9 bpm at 5650 psi, 8,780.0 8,880.0 06:04 06:46 Diff --1,670 psi, WHP=210, BHP=5470 DHWOB=2.5 k 11/14/2018 11/14/2018 0.10 PROD1 DRILL DRLG T 100'wiper up hole, PUW=40K 8,880.0 8,880.0 06:46 06:52 11/14/2018 11/14/2018 0.80 PROD1 DRILL DRUG T BOBO, 1.9 bpm at 5419 psi, Diff --1490 8,880.0 8,980.0 06:52 07:40 psi, WHP=210, BHP=5289, IA=703, OA=693 DHWOB=2.1 K 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T 100' wiper up hole, PUW=35K 8,980.0 8,980.0 07:40 07:46 11/1412018 11/1412018 0.50 PROD1 DRILL DRUG T OBD, 1.9 BPM @ 5583 psi, Diff --1564 8,980.0 9,080.0 07:46 08:16 psi, WHP=219, BHP=5412, IA=703, OA -693 WOB=2.1 K 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T 100'wiper up hole, PUW=35K 9,080.0 9,080.0 08:16 08:22 11/14/2018 11/142018 1.50 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 5584 psi, Diff --1561 9,080.0 9,190.0 08:22 09:52 psi, WHP=233 psi, BHP=5362 psi, IA=703, OA=697 WOB=2.2K 11/14/2018 11/14/2018 0.80 PROD1 DRILL WPRT T Window Wiper, PUW=38K 9,190.0 7,334.0 09:52 10:40 11/14/2018 11/14/2018 0.70 PROD1 DRILL WPRT T Wiper back in hole, RIW=12K 7,334.0 9,190.0 10:40 11:22 11/14/2018 11/1412018 0.50 PROD1 DRILL DRUG T OBD, 1.9 BPM @ 5619, Diff -1550, 9,190.0 9,290.0 11:22 11:52 BHP=5349 WOB=1540 be HKLD=2K "Mud Swap: Begin pumping new mud at 9262" 11/142018 11/14/2018 0.10 PROD1 DRILL WPRT T BHA Wiper 1 00'up hole, PUW=36K 9,290.0 9,290.0 11:52 11:58 11/14/2018 11/142018 0.60 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 4920 psi, 9,290.0 9,390.0 11:58 12:34 Dif"-102psi, WHP=289, BHP=4863, IA=697, OA=664 WOB=2.3K 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T 100'wiper uphole, PUW=36K 9,390.0 9,390.0 12:34 12:40 11/14/2018 11/14/2018 0.80 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 5270 psi, Diff -1511, 9,390.0 9,490.0 12:40 13:28 WHP=321, BHP=5346, IA=696, OA=655, WOB=2.5K 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T 100' wiper uphole, PUW=39K 9,490.0 9,490.0 13:28 13:34 Page 30139 Report Printed: 11/2012018 Aerations Summary (With Timelog , pths) 3H -13A • ' Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sw Depth Start Time End Tire Du(1h Race op Cotla Adi*Co Time P -T -x opmation (") End Depth (l 11/14/2018 11/14/2018 0.80 PROD? DRILL DRLG T OBD, 1.9 BPM @ 5127 psi, Diff -1302, 9,490.0 9,590.0 13:34 14:22 WHP=306, BHP=5229, IA=695, OA=629, WOB=2.2K 11/14/2018 11114/2018 0.20 PROD1 DRILL WPRT T Wipertrip, PUW=38K 9,590.0 8,590.0 14:22 14:34 11/14/2018 11/14/2018 0.30 PROD1 DRILL WPRT T RBIH 8,590.0 9,590.0 14:34 14:52 11/14/2018 11/14/2018 1.30 PROD1 DRILL DRLG T BOBD, 1.9 BPM @ 5301 psi, 9,590.0 9,741.0 14:52 16:10 Diff=1450, WHP=299, BHP=5332, IA=694, OA=11, WOB=2.4K MWD tools acting up @ 9671' (DGS, HOT, DPS, RES all intermittent, continue drilling ahead) 11/14/2018 11/14/2018 2.25 PROM DRILL TRIP T Decision made to POOH to inspect 9,741.0 78.3 16:10 18:25 and changeout BHA, PUW=38K 11/14/2018 11/14/2018 2.20 PROD1 DRILL PULD T PJSM, Driller side PDL froze„ work SL 78.3 0.0 18:25 20:37 free, PUD, AL1 drilling BHA#22 11/14/2018 11/14/2018 1.70 PROD1 DRILL PULD T PD preloaded tools, AL1 drilling BHA 0.0 78.3 20:37 22:19 #23, PU/MU INJH to BHI tools, perfom suface test (ggod-test), continue onto slabbing the INJH, space out, re -set depths 11/14/2018 11/14/2018 1.35 PROM DRILL TRIP T RIH w/AL1 drilling assembly 0.5'- ako 78.3 7,090.0 22:19 23:40 1 1 1 motor, and RR bi-center bit. 11/14/2018 11/14/2018 0.20 PROD1 DRILL DLOG T Log the K1 marker correction of minus 7,090.0 7,128.0 23:40 23:52 5.5' 11/14/2018 11/15/2018 0.13 PROD1 DRILL TRIP T Continue IH 7,128.0 7,430.0 23:52 00:00 Note:7.3 hrs NPT (BHI) 11/15/2018 11/15/2018 0.80 PRO01 DRILL TRIP T Continue IH 7,430.0 9,741.0 00:00 00:48 11/15/2018 11/15/2018 1.00 PRODt DRILL DRLG T BOBD, 1.9 bpm at 4,944 psi, 9,741.0 9,897.0 00:48 01:48 Diff -1,096 psi, WHP=332, BHP=3,882, IA=692, OA=594 11/15/2018 11/15/2018 0.10 PROM DRILL WPRT T 1 00'BHA wiper up hole, PUW 9,897.0 9,812.0 01:48 01:54 11/1512018 11/15/2018 0.10 PRODt DRILL WPRT T Wiper back in hole, RIW 9.4 k 9,812.0 9,897.0 01:54 02:00 11/15/2018 11/15/2018 1.25 PROD1 DRILL DRLG T BOBO, 1.9 bpm at 4,944 psi, 9,897.0 10,100.0 02:00 0315 Diff -1,096 psi, WHP=332, BHP=3,882, IA=692, OA=594 11/15/2018_ 11/15/2018 1.10 PROD1 DRILL WPRT T TD 10,100', chase 5x5 to window 10,100.0 7,315.0 03:15 04:21 11/15/2018 11/15/2018 1.60 PROD1 DRILL WPRT T Continue wiper to the swab valve, 7,315.0 69.5 04:21 05:57 PUW 35 k, performing jogs @ 5,000', 1,500', and 500' 11/15/2018 11/15/2018 1.30 PROD? DRILL TRIP T Trip back in hole 69.5 7,000.0 05:57 07:15 11/1512018 11115/2018 0.10 PROM DRILL DLOG T Log K1, +27' correction 7,000.0 7,113.0 07:15 07:21 11/15/2018 11/15/2018 0.40 PROD1 DRILL DLOG T Perform static pressure survey above 7,113.0 7,300.0 07:21 07:45 the window, trap 11.8 ppg and falls off Ito 11.6 ppg in 14 minutes 11/15/2018 11/15/2018 0.10 PROD? DRILL DLOG T Continue to RIH, log RA, no 7,300.0 7,361.0 07:45 07:51 correction, 11/15/2018 11/15/2018 1.00 PROM DRILL TRIP T RIH, confirm TD at 10,100', PUW=33K 7,361.0 10,100.0 07:51 08:51 11/15/2018 11/15/2018 1.10 PROD1 DRILL DISP T Circulate off bottom while weighting up 10,100.0 10,100.0 08:51 09:57 liner running pill, 1.55 BPM @ 4050 psi Page 31139 ReportPrinted: 1112 0/2 01 8 perations Summary (with Timelog pths) 3H -13A Gog: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depen Stan Tone Erid Time Durtw) Phase opoade ArSuiy Cade Time P -T -x Dpwa m 0") End Deplhilld" 11/15/2018 11/15/2018 1.50 PROD1 DRILL DISP T Lay in 11.8 ppg NaBR liner running pill 10,100.0 6,000.0 09:57 11:27 with 2 ppb alpine beads (52 BBLS), paint TD flag at 8633.4' and 11/15/2018 11/15/2018 1.20 PROD1 DRILL DISP T Continue POOH laying in 11.8 ppg 6,000.0 78.3 11:27 12:39 NaBR completion fluid, paint window flag @ 5778.3' 11/15/2018 11/15/2018 0.60 PROD1 DRILL DISP T Flow check well to confirm killed, 78.3 78.3 12:39 13:15 SIMOPS: PJSM for running liner 11/15/2018 11/15/2018 0.50 PROD1 DRILL PULD T Lay down BHA#23 78.3 0.0 13:15 13:45 11/15/2018 11/152018 0.70 PROW CASING PUTS T Prep rig floor for running liner 0.0 0.0 13:45 14:27 11/152018 11/152018 2.00 PROD1 CASING PUTS T Make up Non=ported bullnose, 47 0.0 1,495.8 14:27 16:27 joints of 2-3/8" 4.7# L-80 ST -L Slotted Liner, and shorty deployment sleeve 11/15/2018 11/1512018 1.40 PRODt CASING PULD T Pick up coil track tools for liner running 1,495.8 1,540.0 16:27 17:51 BHA#24 11/15/2018 11/15/2018 1.00 PROD1 CASING RUNL T RIH with lower liner segment 1,540.0 7,240.0 17:51 18:51 11/15/2018 11/15/2018 0.50 PROD1 CASING RUNL T Come offline with pumps, continue 7,240.0 8,420.0 18:51 19:21 RIH, HKLD=I9K 11/15/2018 11/15/2018 0.10 PROD1 CASING DLOG T slow down to log Kt, 0' correction 8,545.0 8,603.0 19:21 19:27 11/15/2018 11/15/2018 0.70 PROD1 CASING RUNL T continue in hole, work liner down from 8,603.0 10,100.0 19:27 20:09 8603' to 8805' making multiple pickups, weight starts to come back and continue RIH at 50 fpm, 14K HKLD 11/15/2018 11/16/2018 0.10 PROW CASING RUNL T Tag bottom at 10,100', PUW=45K, set 10,100.0 8,604.2 20:09 20:15 back down and come online with pumps 1.48PM/3000psi, release off liner, PUW=33K 11/15/2018 11/15/2018 2.00 PROD1 CASING TRIP T Trip out of hole, pumping down 8,604.2 44.2 20:15 22:15 backside 11/15/2018 11/15/2018 0.50 PROD1 CASING PULD T UD lower liner running BHA #24 44.2 0.0 22:15 22:45 11/15/2018 11/15/2018 1.00 PROD1 CASING PUTB T Prep Rig floor for running liner 0.0 0.0 22:45 23:45 11/152018 11/16/2018 0.25 PROD1 CASING PUTB T Start PU upper slotted liner segment 0.0 94.3 23:45 00:00 11/16/2018 11/16/2018 2.00 PROD1 CASING PUTS T Continue PU slotted liner Jt 3-36, 94.3 1,128.2 00:00 0209 11/16/2018 11/16/2018 0.25 PROD1 CASING PULD T RD liner running equipment. 1,128.2 1,128.2 02:00 02:15 11/16/2018 11/16/2018 0.60 PROD1 CASING PULD T PU/MU CoiltrakTools, surface test 1,128.2 1,172.4 02:15 02:51 (good -test), inspect pac-off (good), '•' Note: Hanging weight 5,600 lbs 11/16/2018 11/16/2018 1.25 PROD1 CASING RUNL T Tag up, reset counters, RIH w/BHA 1,172.4 7,182.0 02:51 04:06 #25 11/16/2018 11/16/2018 0.15 PROD1 CASING RUNL T Correct to the EDP flag (minus 9.16'), 7,182.0 7,182.0 04:06 04:15 PUW 35 k 11/16/2018 11/16/2018 1.70 PROD1 CASING RUNL T Continue IH, work liner down 6,232'- 7,182.0 6,603.1 04:15 05:57 8603.4' 11/16/2018 11/16/2018 0.60 PROD1 CASING RUNL T Bring pump up to 1.4 bpm @ 2,046 8,603.1 8,603.1 05:57 06:33 psi, 59 psi differential pressure, unable to release from liner. decision was made to POOH 11/16/2018 11/16/2018 1.50 PROD1 CASING RUNL T Line up across the top, POOH 8,603.1 1,123.3 06:33 08:03 11/16/2018 11/16/2018 0.50 PRODt CASING PULD T At surface, check well for flow, LD 1,123.3 1,123.3 08:03 08:33 Coiltrak tools, found EDC Page 32139 ReportPrinted: 11/2012018 ,lerations Summary (with Timelog , dths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SMn tem Stat Tire End Time OwN M se Go code AcWtTCafe Tare P -T -X Opmdon (ftKB) Entl OryMlH143) 11/16/2018 11/16/2018 1.50 PROM CASING PULD T PU new BHA#26, surface test (good- 1,123.3 1,172.4 08:33 10:03 test), stab INJH ""' Note: Hanging weight 5,800 Ilbs 11/16/2018 11/16/2018 1.25 PROM CASING RUNL T RIH, w/upper liner segment 36 Its of 1,172.4 7,128.4 10:03 11:18 slotted liner, shorty deployment sleeve, and ported bullnose 11/16/2018 11/16/2018 0.15 PROM CASING RUNL T Correct to the EDP flag (minus 9.76) 7,128.4 7,128.4 11:18 11:27 11/16/2018 11/162018 0.50 PROM CASING RUNL T Continued IH clean to TD 8603.4' 7,128.4 8,603.4 .11:27 11:57 `•' Note: NPT time 5 hrs (BHI) 11/16/2018 11116/2018 0.20 PROM CASING RUNL T Set down on bottom. PUW 36 k, bring 8,603.4 7,475.4 11:57 12:09 pump up to 1.5 bpm at 3,400 psi, 1019 psi differenlual, PUW 32 k 11/162018 11/16/2018 1.00 PROM CASING TRIP T POOH, pumping across the top 7,475.4 44.2 12:09 13:09 11/16/2018 11/162018 0.70 PROM CASING PULD T At surface, check well for flow, LD 44.2 0.0 13:09 13:51 setting tools on a dead well. 11/16/2018 11/16/2018 0.60 PROM CASING CTOP T Perform a function test 0.0 0.0 13:51 14:27 11/16/2018 11/16/2018 0.65 PROM CASING PULD T PU, OH Anchored Billet and CoilTrak 0.0 73.4 14:27 15:06 toolst, MU UQC, surface test (good - test), Stab INJH, tag up, reset counter depths 11/16/2018 11/16/2018 1.40 PROM CASING TRIP T RIH, w/OH Anchored Billet BHA #27 73.4 7,095.0 15:06 16:30 11/16/2018 11/16/2018 0.20 PROM CASING DLOG T Log the K1 correction of minus 7.0', 7,095.0 7,119.0 16:30 16:42 - PUW 35 k, close EDC @ 7305.7' 11/16/2018 11/162018 0.20 PROM CASING TRIP T Continue IH 7,119.0 7,474.4 16:42 16:54 11/16/2018 11/16/2018 0.20 PROM CASING WPST T Set down on depth, PUH 32 k, bring 7,474.4 7,463.7 16:54 17:06 pump up to shear @ 3,100 psi, PUW 34 k 11/16/2018 11/162018 1.30 PROM CASING WPST T POOH, tag up, PJSM, flow check 7,463.7 73.0 17:06 18:24 11/162018 11/16/2018 070 PROM CASING PULD T LD BHA#26 73.0 0.0 18:24 19:06 111162018 11/16/2018 0.90 PRODS STK PULD P PU BHA#27 KO/Drill Assembly 0.0 78.0 19:06 20:00 (agitator, 0.5' AKO motor, RS Hughes P104 bit), slide in cart, change out UQC checks, check pack -offs, good, MU to coil 11/16/2018 11/1612018 1.30 PRODS STK TRIP P RIH w/ BHA#28, shallow test at 78.0 7,090.0 20:00 21:18 500' (pipe vibrating significantly, though little to no read-out on transducer screen, possibly b/c pumping 11.8 KW) 11/16/2018 111162018 0.10 PRODS STK DLOG P Log K1 for a -6.5' correction 7,090.0 7,120.0 21:18 21:24 11/16/2018 11116/2018 0.30 PRODS STK TRIP P Continue RIH 7,120.0 7,288.0 21:24 21:42 11/16/2018 11/16/2018 0.80 PRODS STK DLOG P Displace to PowerPro drilling fluid w/ 7,288.0 7,288.0 21:42 22:30 EDC closed, PUW = 32K 11/16/2018 11/16/2018 0.30 PRODS STK TRIP P Continue RIH, dry tag TOB @ 7462:3', 7,288.0 7,461.8 22:30 22:48 come up to milling rate„ PUW = 32K, tag 7461.8' pumping 11/162018 11116/2018 0.90 PRODS STK KOST P Milling off billet 1 fph for 1 ft, CWT = 7,461.8 7,462.8 22:48 23:42 18K, WOB = 0.5K, , BHP = 3705 psi, WHP = 381 psi, 11/16/2018 11/17/2018 0.30 PRODS STK KOST P Go to 2 fph for 1 ft, CWT = 16K, WOB 7,462.8 7,463.4 23:42 00:00 =.1K Page 33139 Report Printed: 11 /2 012 01 8 Aerations Summary (with Timelog . pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slsi Tip Eed Tip DWM Pham op Code ArSvdy Cade Tore P-T-x OP.MUM Siad Depdh 00) EMDeyMMG) 11/17/2018 11/17/2018 020 PRODS STK KOST P Continue 2 fph for 1 ft 7,463.4 7,463.8 00:00 00:12 11/17/2018 11/17/2018 0.30 PRODS STK KOST P Go to 3 fph for 1', begin pushing on it 7,463.8 7,464.8 00:12 00:30 11/17/2018 11/172018 0.70 PROD3 DRILL DRLG P Drilling, CWT = 3.5K, WOB = 1.5K, 7,464.8 7,584.0 00:30 01:12 BHP = 3684 psi, WHP = 322 psi, circ = 4791, 1.9 bpm in, 1.85 bpm out, pump 5x5 sweeps 11/172018 11/17/2018 0.20 PRODS DRILL WPRT P PUW = 35K, drift billet area up & 7,564.0 7,584.0 01:12 01:24 down, clean, RBIH 11/17/2016 11/17/2018 1.80 PRODS DRILL DRLG P OBD, CWT= 15K, WOB= 1.4K, BHP 7,584.0 7,900.0 01:24 03:12 = 3680 psi, WHP = 245 psi, circ = 4900 psi, 1.9 bpm, pull 1 00'wipers every 100', towards planned 400' drill interval, pump 5x5 sweeps, Avg ROP = 175 fph PUW's = 36K-39K, capture transducer Posen off bottom 11/17/2018 11/172018 0.20 PRODS DRILL WPRT P Wiper up-hole, PUW =36K 7,900.0 7,500.0 03:12 03:24 11/17/2018 11/1712018 0.20 PRODS DRILL WPRT P Wiper in-hole, RIW = 15K 7,500.0 7,900.0 03:24 03:36 11/17/2018 11/172018 0.70 PRODS DRILL DRLG P Drilling, 1.9 bpm, FS = 1050 psi, CWT 7,900.0 8,000.0 03:36 04:18 = 13K, WOB = 2.5K, BHP = 3688 psi, WHP =278 psi, circ =5069 psi, continue 100' drilled & 100' wiper PUWs = 37K 11/172018 11/17/2018 0.15 PRODS DRILL WPRT P 100'wiper up hole PUW 37 k 8,000.0 8,000.0 04:18 04:27 11/17/2018 11/17/2018 0.70 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,758 psi, Diff--239 8,000.0 8,100.0 04:27 05:09 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2018 11/17/2018 0.15 PRODS DRILL WPRT P 1 00'wiper up hole PUW 37 k 8,100.0 8,100.0 05:09 05:18 11/17/2018 11/172018 0.42 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,782 psi, Diff--239 8,100.0 8,200.0 05:18 05:43 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2018 11/17/2018 0.15 PRODS DRILL WPRT P 100' wiper up hole PUW 37 k 8,200.0 8,200.0 05:43 05:52 11/17/2018 11/172018 0.45 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,782 psi, Diff-239 8,200.0 8,300.0 05:52 06:19 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2018 11/17/2018 0.30 PRODS DRILL WPRT P 800' wiper up hole, PUW 37 k 8,300.0 7,500.0 06:19 06:37 11/17/2018 11/17/2018 0.20 PRODS DRILL WPRT P Wiper back in hole, RIW 11 k 7,500.0 8,300.0 06:37 06:49 11/172018 11/17/2018 0.65 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Diff=368 8,300.0 8,400.0 06:49 07:28 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2018 111172018 0.15 PRODS DRILL WPRT P 100' wiper up hole PUW 37 k 8,400.0 8,400.0 07:28 07:37 11/17/2018 11/17/2018 0.65 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Diff=368 8,400.0 8,500.0 07:37 08:16 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2018 11/17/2018 0.15 PRODS DRILL WPRT P 100' wiper up hole PUW 37 k 8,500.0 8,500.0 08:16 08:25 11/17/2018 11/17/2018 0.80 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Diff--368 8,500.0 8,665.0 08:25 09:13 psi, WHP=323, BHP=3,754, IA=695, OA=688 Page 34/39 Report Printed: 11/2012018 ,aerations Summary (with Timelog , dths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stmt Time End Tire D, (M Phim Op Cods ACH01 Code rime P.T-X Opeia9m SWIDepth (11103) End Oeptll (fiI(B) 11/17/2018 11/17/2018 0.75 PROD3 DRILL WPRT P Wiper up hole inside pipe, w/5x5 8,665.0 7,315.0 09:13 09:58 sweep 11/17/2018 11/17/2018 0.60 PROD3 DRILL WPRT P Continue pulling up hole, chasing 5x5 7,315.0 7,090.0 09:58 10:34 sweep, pump bottoms up. 11/17/2018 11/17/2018 0.20 PROD3 DRILL DLOG P Log the K1 marker correction of (+0.5) 7,090.0 7,120.0 10:34 10:46 11/17/2018 11/17/2018 0.25 PROD3 DRILL WPRT P RIH, perform static pressure survey 7,120.0 7,302.0 10:46 11:01 above window @ 7,302', close choke in 11.8 ppg, shut pump down, monitor annular pressure, 11.6 ppg, 11/17/2018 11/17/2018 0.40 PROD3 DRILL WPRT P Continue wiper back in hole. RIW 11 7,302.0 8,665.0 11:01 11:25 1 k 11/17/2018 11/17/2018 0.70 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, 8,665.0 8,765.0 11:25 12:07 Diff=1,039 psi, WHP=253, BHP=3,781, IA=697, OA=688 11/17/2018 11/17/2018 0.15 PROD3 DRILL WPRT P 1 00'wiper up hole PUW 37 k 8,765.0 8,765.0 12:07 12:16 11/17/2018 11/17/2018 1.00 PROD3 DRILL DRLG P BOBO, 1.9 bpm at 4,877 psi, 8,765.0 8,866.0 12:16 13:16 Diff=1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/1712018 11/17/2018 0.15 PROD3 DRILL WPRT P 100' wiper up hole PUW 37 k 8,866.0 8,866.0 13:16 13:25 11/17/2018 11/17/2018 1.00 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 8,866.0 8,985.0 13:25 14:25 Diff-1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/17/2018 11/17/2018 0.15 PROD3 DRILL WPRT P 100 wiper up hole PUW 37 k 8,985.0 8,985.0 14:25 14:34 ' 11/17/2018 11/17/2018 1.00 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 8,985.0 9,065.0 14:34 15:34 Diff=1, 119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/17/2018 11/17/2018 0.35 PROD3 DRILL WPRT P 800', wiper up hole, PUW 37 k 9,065.0 8,265.0 15:34 15:55 11/17/2018 11/17/2018 0.35 PROD3 DRILL WPRT P Wiper back in hole, RIW 15 k 8,265.0 9,065.0 15:55 16:16 11/17/2018 11/17/2018 1.74 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 9,065.0 9,216.0 16:16 1800 Diff--1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/17/2018 11/17/2018 2.00 PROD3 DRILL DRLG P Crew change, BOBO, CWT=3.8K, FS 9,216.0 9,470.0 18:00 20:00 = 1098 psi @ 1.9 bpm, circ = 5220 psi, BHP = 3818 psi (11.8 EMW @ window), pump 5x5 sweeps 11/17/2018 11/17/2018 1.50 PROD3 DRILL WPRT P Wiper to window, PUW =37K, MAD 9,470.0 7,300.0 20:00 21:30 pass 7500'-7320'@ 5 fpm (for resistivity) 11/1712018 11/17/2018 0.50 PROD3 DRILL DLOG P Obtain SBHP 7,300.0 7,300.0 21:30 22:00 Trap 11.87 ppg EMW (3,666 psi), MD = 7300', TVD sensor= 5939.4', allow to drop to 3620' psi, bleed to 3602 psi, built back up to 3618 psi (EMW = 11.72 ppg) * Seat mud pump #2 (Nabors 1/2 hour per tour used) 11/17/2018 11/17/2018 0.30 PROD3 DRILL DLOG P Log RA for +2' correction 7,300.0 7,357.0 22:00 22:18 11/17/2018 11/17/2018 0.70 PROD3 DRILL TRIP P TO called, RBIH, confirm TD at 9470' 7,357.0 9,470.0 22:18 23:00 11/17/2018 11/18/2018 0.99 PRODS DRILL WPRT P Wiper to swab, PUW = 37K 9,470.0 7,630.0 23:00 00:00 11/18/2018 11/18/2018 PROD! 7,630.0 00:00 00:00 Page 35139 ReportPrinted: 11/2012018 perations Summary (with Timelog pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sart Time EndTim Durk Phase op Code AcG' Code '�M Time P -T -X OPnaGm n De alert Depth ErN Depth (GI®) 11/18/2018 11/18/2018 1.80 PRODS DRILL WPRT P Continue wiper to swab 7,630.0 78.0 00:00 01:48 11/18/2018 11/18/2018 1.30 PRODS DRILL WPRT P RBIH 78.0 7,090.0 01:48 03:06 11/18/2018 11/18/2018 0.20 PRODS DRILL DLOG P Log K1 for -7' correction 7,090.0 7,124.0 03:06 03:18 11/18/2018 11/18/2018 0.10 PRODS DRILL WPRT P Continue RIH to 7300' 7,124.0 7,300.0 03:18 03:24 11/18/2018 11/1812018 0.20 PRODS DRILL DLOG P SBHP: bleed to 3599 psi, MID -bit = 7,300.0 7,300.0 03:24 03:36 7300', TVD -sensor = 5939', -15 min BHP at 3611 psi, 11.7 ppg EMW 11/18/2018 11/18/2018 0.90 PRODS DRILL WPRT P Continue RIH, RIW = 13K, confirm TD 7,300.0 9,473.0 03:36 04:30 at 9,473' 11/18/2018 11/18/2018 1.15 PRODS DRILL TRIP P POOH, laying in 12.0 ppg beaded 9,473.0 7,315.0 04:30 05:39 LRP up to the window 11/18/2018 11/18/2018 0.90 PRODS DRILL TRIP P Continue POOH, displacing well to 7,315.0 6,645.0 05:39 06:33 12.0 ppg completion fluid. 11/18/2018 11/18/2018 0.20 PRODS DRILL TRIP P Perform flow check before pulling to 6,645.0 6,645.0 06:33 06:45 surface (no -flow) 11/18/2018 11/18/2018 1.25 PRODS DRILL TRIP P Continue POOH 6,645.0 78.3 06:45 08:00 11/18/2018 11/18/2018 0.50 PRODS DRILL PULD P At surface, check well for flow (no- 78.3 78.3 08:00 08:30 flow) "' Note: 8 bph loss rate 11/18/2018 11/18/2018 0.50 PRODS DRILL PULD P LD Drilling BHA on a dead well. 78.3 0.0 08:30 09:00 11/18/2018 11/18/2018 0.50 PRODS CASING PUTS P Prep RF for liner ops 0.0 0.0 09:00 09:30 11/18/2018 11/18/2018 2.75 PROD3 CASING PUTB P PU/MU 55 jts of slotted 2-3/8" liner, 0.0 1,750.7 09:30 12:15 MU Liner Top Billet, and non -ported bullnose. 11/18/2018 11/18/2018 0.50 PRODS CASING PUTS P RD liner running equipment 1,750.7 1,750,7 12:15 12:45 11/18/2018 11/18/2018 0.75 PROD3 CASING PULD P PU/MU Coiltrak tools with blind sub, 1,750.7 1,795.3 . 12:45 13:30 slide cart forward, replace checks in the upper quick, check pac-offs (Change -out) 11/1812018 11/18/2018 1.00 PRODS CASING RUNL P Tag up, reset counters, RIH 1,795.3 7,202.0 13:30 14:30 11/18/2018 11/18/2018 0.15 PRODS CASING RUNL P Correct to EOP (-7.64'), PUW 37 k 7,202.0 7,196.4 14:30 14:39 11/1812018 11/18/2018 0.50 PRODS CASING RUNL P Continue IH 7,196.4 9,078.0 14:39 15:09 11/18/2018 11/18/2018 0.45 PRODS CASING RUNL P Set down @ 9,078', PUW 39k, 9,078.0 9,473.0 15:09 15:36 continue to work pipe IH, continued RIH clean from 9,108'to bottom. 11/1812018 11/18/2018 0.15 PRODS CASING RUNL P Bring pump up 1.5 bpm, PUW 32 9,473.0 9,473.0 15:36 15:45 11/18/2018 11/18/2018 1.15 PRODS CASING TRIP P Pumping across the top, remove liner 9,473.0 44.2 15:45 16:54 length from counters, POOH 11/1812018 11/18/2018 0.60 PRODS CASING PULD P Check well for flow, PJSM, LD setting 44.2 0.0 16:54 17:30 tools on a dead well 11/18/2018 11/18/2018 1.20 PROD4 STK PULD P PU BHA #30 KO/Drill Assembly 0.0 78.0 17:30 18:42 (Agitator, 0.7" AKO, RB P104 bit), slide in cart, check pack -offs, good, MU to coil, tag up, set counters 11/18/2018 11/18/2018 1.30 PROD4 STK TRIP P RIH w/ BHA #30, shallow test (cols, 78.0 7,090.0 18:42 20:00 good 11/18/2018 11/18/2018 0.20 PROD4 STK DLOG P Log K1 for -8' correction 7,090.0 7,120.0 20:00 20:12 1 Page 36139 Report Printed: 11 /2 012 01 8 aerations Summary (with Timelog . pths) 3H -13A • Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End lire DrlM phase Op Code Activity Code nate P -Tac operaYon ShetDeptM OM) End Depth (MM) 11/18/2018 11/18/2018 1.20 PROD4 STK DISP P Displace to PowerPro, PUW =31K 7,120.0 7,300.0 20:12 21:24 11/18/2018 11/18/2018 0.80 PROD4 STK DLOG P Continue RIH, MAD pass fro 7550' up 7,300.0 7,550.0 21:24 22:12 to 7350' 11/18/2018 11/18/2018 0.40 PROD4 STK TRIP P RIH, dry tag TOB @ 7720', PUW = 7,550.0 7,719.8 22:12 22:36 35K, bring up rate, RBIH, begin milling @ 7719.6, PU to adjust TF 11/18/2018 11/18/2018 0.90 PROD4 STK KOST P Milling 1 fph for 1 ft, FS = 1080 psi @ 7,719.8 7,720.8 22:35 23:30 1.87 bpm, BHP = 3721 psi, WHP = 215 psi, circ = 5097 psi 11/182018 11/19/2018 0.50 PROD4 STK KOST P Go to 2 fph for 1 ft 7,720.8 7,721.8 23:30 00:00 11/19/2018 11/19/2018 0.30 PROD4 STK KOST P Go to 3 fph for 1 ft, begin pushing on it 7,721.8 7,722.8 00:00 00:18 @ Nin 11/192018 11/19/2018 0.60 PROD4 DRILL DRLG P Drilling, 1.87 bpm, CWT= 14.3K, 7,722.8 7,800.0 00:18 00:54 WOB =.8K, BHP = 3737 psi, WHP = 207 psi, circ = 4964 psi, pump 5x5 sweeps, PUW = 38K 11/19/2018. 11/19/2018 0.10 PROD4 DRILL WPRT P Drift billet area up & down, slight WOB 7,800.0 7,800.0 00:54 01:00 1 1bobble at 7720' PUH 11/19/2018 11/19/2018 2.00 PROD4 DRILL DRLG P Drilling, FS = 1100 psi @ 1.9 bpm, 7,800.0 7,963.0 01:00 03:00 CWT = 15K, WOB = 1.71K, BHP = 3736 psi, WHP = 202 psi, circ = 5190 psi, BHA wiper every 100', lower ROP - beginning @ 7954' Holding 11.9 ppg for 1 -for -1, blow down MM, come down to 11.8 ppg & maintain 1 -for -1 11/19/2018 11/19/2018 1.00 PROD4 DRILL DRLG P Drilling, 1.9 bpm, BHP = 3713 psi, 7,963.0 8,000.0 03:00 04:00 WHP = 187 psi, circe = 5104 psi, rip = 1313 psi, drilling through higher API interval wl low ROP (-25 fph) 11/19/2018 11/19/2018 0.10 PROD4 DRILL WPRT P 100 ft Wper, PUW = 38K, RIW = 15K 8,000.0 8,000.0 04:00 04:06 11/19/2018 11/192018 2.70 PROD4 DRILL DRLG P Drilling, FS = 1150 psi @ 1.9 bpm, 8,000.0 8,125.0 04:06 06:48 BHP = 3690 psi, WHP = 163 psi, circ = 5022 psi 11/19/2018 11/19/2018 0.30 PROD4 DRILL WPRT P Wiper up hole to 7,400', PUW 40 k 8,125.0 7,400.0 06:48 07:06 11/192018 11/19/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 13.9 k 7,400.0 8,125.0 07:06 07:24 11/192018 11/19/2018 2.00 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, 8,125.0 8,171.0 07:24 09:24 Diff --1,098 psi, WHP=236, IA=702, OA=709 111192018 11/192018 0.10 PROD4 DRILL WPRT P 200' wiper up hole, PUW 38 k 8,171.0 7,971.0 09:24 09:30 11/19/2018 11/192018 0.10 PROD4 DRILL WPRT P Wiper back in hole, RIW 12.8 k 7,971.0 8,171.0 09:30 09:36 11/19/2018 11/192018 1.40 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, 8,171.0 8,200.0 09:36 11:00 Diff --1,098 psi, WHP=236, IA=702, OA=709 11/19/2018 11/19/2018 0.20 PROD4 DRILL WPRT P Wiper up hole to 7,900', PUW 39 k 8,200.0 7,900.0 11:00 11:12 11119/2018 11/19/2018 0.20 PROD4 DRILL WPRT P Wiper back in hole. RIW 9.8 k 7,900.0 8,200.0 11:12 11:24 11/19/2018 11/19/2018 0.25 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, Diff=984 8,200.0 8,210.0 11:24 11:39 psi, WHP=336, IA=702, OA=709 11/19/2018 11/19/2018 0.60 PROD4 DRILL WPRT P Wiper up hole to above window, PUW 8,210.0 7,090.0 11:39 12:15 38 k 11/19/2018 11/19/2018 0.20 PROD DRILL DLOG P Log the K1 marker correction plus 1.0' 7,090.0 7,126.0 12:15 12:27 I - Page 37139 Report Printed: 11/20/2018 perations Summary (with Til.pths) 3H-13Aip Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Star oegh Slat Tine EWTme ourm Phase op Cale Pmriy Cade Time P -T -X operavan (N®) End Deplh(11m) 11/19/2018 11/19/2018 0.50 PROD4 DRILL WPRT P with bottoms up, RIH RIW 14.7 k 7,126.0 8,210.0 12:27 12:57 "'• Note: Set dawn 8,165' 11/19/2018 11/19/2018 1.25 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, Diff=984 8,210.0 8,243.0 12:57 14:12 psi, WHP=336, IA=702, OA=709 11/19/2018 11/19/2018 0.25 PROD4 DRILL WPRT P Wiper to the billet, PUW 37 k 8,243.0 7,740.0 14:12 14:27 •'• Note: Called TD early do to hole conditions/150 API 11/19/2018 11/19/2018 0.40 PROD4 DRILL WPRT P RBIH to 7,950', RIW 13.3 k 7,740.0 7,950.0 14:27 14:51 11/19/2018 11/1912018 2.00 PROD4 DRILL WPRT P POOH chasing sweeps, performing 7,950.0 78.3 14:51 16:51 jogs @ 5,200', 3,200', and 517' 11/19/2018 11/19/2018 1.15 PROD4 DRILL TRIP P Tag up, reset counter depths, RIH 78.3 7,090.0 16:51 18:00 11/19/2018 11/1912018 0.15 PROD4 DRILL DLOG P Log the K1 correction of minus 8.0' 7,090.0 7,126.0 18:00 18:09 11/19/2018 11119/2018 0.15 PROD4 DRILL DLOG P Perform Static Pressure Survey @ 7,126.0 7,300.0 18:09 18:18 7,300', 5,939' (rVD), 3,632 psi (11.76 ppg) 11/19/2018 11/19/2018 0.55 PROD4 DRILL TRIP P Continue IH off bottom @ 7,950', PUW 7,300.0 7,950.0 18:18 18:51 34 k 11/19/2018 11/19/2018 1.00 PROD4 DRILL TRIP P POOH, laying in 12.0 ppg beaded liner 7,950.0 5,500.0 18:51 19:51 running pill up into cased hole, 5,500', Painting EDP flags TD and above Window 11/1912018 11/19/2018 1.00 PROD4 DRILL TRIP P Continue POOH, displacing well to 5,500.0 78.3 19:51 20:51 12.0 ppg completion fluid 11/19/2018 11/19/2018 0.50 PROD4 DRILL PULD P At surface, check well for flow, PJSM 78.3 78.3 20:51 21:21 11/19/2018 11/19/2018 0.55 PROD4 DRILL PULD P LD drilling BHA on a dead well 78.3 0.0 21:21 21:54 11/1912018 11/19/2018 0.45 PROD4 CASING PUTS P Prep rig floor for liner ops, PJSM 0.0 0.0 21:54 22:21 11/1912018 11/19/2018 1.15 COMPZ4 CASING PUTB P MU AL1 -03 liner segment 22 Its, 0.0 685.0 22:21 23:30 shorty deployment sleeve, and non - ported bullnose. 11/19/2018 11/20/2018 0.50 COMPZ4 CASING PULD P Begina PU Liner running tools BHA 685.0 685.0 23:30 00:00 #31 11/20/2018 11/20/2018 0.30 COMPZ4 CASING PULD P Complete PU Liner running tools BHA 685.0 730.0 00:00 00:18 #31, slide in cart, change out checks, MU to coil, tag up, set counters 11/20/2018 11/20/2018 2.90 COMPZ4 CASING RUNL P RIH W BHA #31, -6.13'correction to 730.0 7,944.0 00:18 03:12 window flag, PUW = 35K , continue RIH to 7944', PUW = 40, RBIH, bring up pumps 1.55 bpm (dp = 1000 psi), release off liner, PUW = 34K, BOM = 7944', TOL- 7258' 11/20/2018 11/20/2018 0.30 COMPZ4 CASING DLOG P Obtain SBHP (15 min): MD = 7243.6', 7,944.0 7,224.0 03:12 03:30 TVD sensor= 5927.3', Annular= 3667 psi, EMW = 11.91 ppg Note: EMW = 11.76 ppg on last SBHP W 9 ppg PowerPro in the well 11/20/2018 11/20/2018 2.00 COMPZ4 CASING DISP P Open EDC, displace well to seawater, 7,234.0 2,500.0 03:30 05:30 POOH 11/2012018 11/2012018 1.70 COMPZ4 CASING FRZP P Ffreeze protect from 2500'to surface, 2,500.0 44.0 05:30 07:12 POOH 11/20/2018. 11/20/2018 1.30 COMPZ4 CASING PULD P PJSM, PUD & LD BHA#31 44.0 0.0 07:12 08:30 ••SITP = 1180 psi, IA= 670 psi, OA= 482 psi Page 38139 ReportPrinted: 11120/2018 Aerations Summary (with Timelog pths) 3H -13A Rig: NABORS CDR3-AC Jab: DRILLING SIDETRACK Time Log Stan Depth SMnTine End Tine Dv IM Phase Op Code ACWIb Cade rime P -T-% ope� Mike) Eno Depth (Ka) 11/20/2018 11/20/2018 1.50 DEMOB WHDBOP RURD P Clear rig floor, MU nozzle, stab on, 0.0 0.0 08:30 10:00 flush stack, pop off, break -off nozzle, blow down surface lines, clear floor, working RD checklist. 11/20/2018 11/20/2018 1.00 DEMOB WHDBOP RURD P Remove UQC checks, work RD 0.0 0.0 10:00 11:00 checklist, vac out stack, freeze protect tree 11/20/2018 11/20/2018 1.00 DEMOB WHDBOP NUND P ND BOP 0.0 0.0 11:00 12:00 Rig Released: 11/20 12:00 hrs Page 39139 ReportPrinted: 11/20/2018 ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3H Pad 3H-13AL1-01 PB1 Baker Hughes INTEQ Definitive Survey Report 07 December, 2018 BA (ER F�UGHES a GE company ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 3H Pad MD Reference: Well: 31-1-13 North Reference'. Wellbore: 3H-13AL7-01PB1 Survey Calculation Method: Design: 3H-13ALi-01PB1 Database: Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Enact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3H-13 Well Position +WS 0.00 usft Northing: +FJ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 3H-13AL1-01PB1 Magnetics Model Name Sample Date BGGM2018 11/1/2018 Design 3H-13AL1-01PBi Audit Notes: Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) (usft) 71.00 Well 3H-13 3H -13A Q 71.00usft (3H -13A) 3H -13A Q 71.00usit (3H -13A) True Minimum Curvature EDT 14 Alaska Production Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,000,475.46usft Latitude: 498.655.42usft Longitude: usft Ground Level: Declination Dip Angle V) V) 16.83 80.91 Tie On Depth: 7,702.02 +N/ -S (usft) 000 +E/ -W (usft) 000 Direction (1) 180.00 BA,GM ✓�' 70° 24'45.119 N 150° 0'39.419 W 0.00 usft Field Strength (nT) 57,435 12/7/2018 3:42:20PM Page 2 COMPASS 5000.14 Build 85D Survey ConocoPhillips aA�WER ConocoPhilli s Map Definitive Survey Report Vertical HE Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 3HA3 7VDSS Project: Kupamk River Unit TVD Reference: 311-13A @ 71.00usft (3H -13A) Site: Kuparuk 3H Pad 0 MD Reference: 3H -13A @ 71.00usft (3H -13A) (usft) (usft) Well: 311-13 Easting North Reference: True Survey Tool Name Annotation Wellbore: 3H-13AL1-01PB1 Survey Calculation Method: Minimum Curvature Design: 3H-13AL1-01PB1 Database: EDT 14 Alaska Production 7.702.02 Survey Program 165.22 Date -5,934.05 3,015.87 541.15 6,003,491.12 From To 3,015.87 MWD (4) TIP Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Data End Date 95.00 5,900.00 3W13 (311-13) GCT -MS Schlumberger GCT multishot 111212001 165.00 6,113.56 7,260.49 3H-13AATOB(3H-13A) MWD MWD -Standard 911812001 13.84 7,340.00 7,390.33 3H-13AL1PB7 MWDANC(3H-13ALiPB1 MWD -INC -ONLY MWD-INC_ONLY_FILLER 10/24/2018 10124,`2018 7,427.83 7,702.02 3H-13ALiPBi MWD(3H-13ALiPB1) MWD MWD- Standard 10/24/2018 10/27/2018 7,730.00 7,820.91 3H-13AL1-01PBi MWD4NC(3H-13AL1- MWD -INC -ONLY MWD -INC -ONLY -FILLER 11/1/2018 11/1/2018 7,854.84 10,659.54 3H-13AL1-01PBI MWD(3H-13AL1-01PB MWD MWD - Standard 11f1/2018 11/4/2018 Survey 12q/2018 3.4220PM Page 3 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc ANTVD 7VDSS +N/3 +FJ -W DLS (usft) 0 (°) (usft) (usft) (usft) (usft) Northing Easting Section Survey Tool Name Annotation (ft) (ft) (ft) 7.702.02 9178 165.22 6.005.05 -5,934.05 3,015.87 541.15 6,003,491.12 498,111.87 8.43 3,015.87 MWD (4) TIP 7.730.00 92.11 168.61 6,004.10 -5,933.10 2.988.63 537,82 6,003,463.89 498,118.19 12.17 -2,988.63 MWD -INC -ONLY (5) KOP 7,760.26 94.24 165.00 6.00242 -5,931.42 2,959.22 530.93 6,003,434.48 498,125.08 13.84 -2,959.22 MWD-INC_ONLY (5) Interpolated Azimuth 7,79040 97.39 163,00 5,999.37 -5,926.37 2,930.40 522.66 6,003,405.67 498.133,34 1236 -2.930.40 MWD-INC_ONLY (5) Interpolated Azimuth 7,820.91 97.51 164.50 5,995.41 -5,924.41 2.901.36 -514.20 6,003,376.62 498.141.79 4.89 -2,901.36 MWD -INC _ONLY (5) Interpolated Azimuth 7,854.84 98.04 16539 5,990.82 -5,919.82 2,868.90 50547 6,003.344.16 498,150.52 3.03 -2,868.90 MWD(6) 7,881.16 99.06 168.46 5,986.91 -5,915.91 2,843.55 499.58 6,003.318.81 498,156.40 12.17 -2.843.55 MWD (6) 7.910.12 97.17 169.93 5,982.82 -5,911.82 281539 494.20 6,003,290.66 498.161.77 8.24 -2,815.39 MWD (6) 7,946.23 96.93 170.51 5,978.39 -5,907.39 2,780.07 488.12 6,003,255.34 498.167.85 173 -2,780.07 MWD (6) 7,974,74 97.05 174.64 5,974.92 -5,903.92 2.752.02 484.6 6,003,227.29 498,171.50 1438 -2.752.02 MWD (6) 8,005.64 9182 177.59 5,970.92 -5,899.92 2,721.45 -482.38 6,003.196.73 498,173.57 9.79 -2.721.45 MWD (6) 8,035.25 97.36 179.22 5,967.01 -5,896.01 2,692.11 481.57 6,003,167.39 498,174.38 567 -2,692.11 MWD (6) 8.066.57 94.73 180.62 5,963.71 -5,892.71 266097 481.53 6,001 498.174.42 9.50 -2,660.97 MWD(6) 8.100.46 91.53 180.83 5,961.86 -5,890.86 2,627.14 48195 6,003,102.42 498.173.99 9.46 -2,627.14 MWD(6) 8,130.66 9061 182.09 5,961.29 -5,890.29 2,596.96 482.72 6,003,072.24 498.173.21 5.17 -2,596.96 MWD (6) 8.160.65 90.77 184.71 5,96093 -5,889.93 2.567.02 484.50 6,003,042.31 498.171.43 8.75 -2,567.02 MWD (6) 8.190.51 89.57 186.29 5,96084 -5.889.84 2,537.30 -487.36 6.003,012.60 498.168.56 6.64 -2,537.30 MWD (6) 8220.36 89.54 188.71 5,961.08 5,890.08 2.507.71 -491.26 6,002,983.01 498.164.66 8.11 -2,507.71 MWD (6) 12q/2018 3.4220PM Page 3 COMPASS 5000.14 Build 85D ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3H-13 Project: Kuparuk River Unit TVD Reference: 3H -13A @ 71.00usfl (31-1-13A) Site: Kuparuk 3H Pad MID Reference: 31-1-13A @ 71.00usft (31-1-13A) Well: 31-1-13 North Reference: True Wellbore: 3H-13AL1-01PS1 Survey Calculation Method: Minimum Curvature Design: 3H-13AL1-01PB1 Database: EDT 14 Alaska Production Survey Annotation SA ER F�UGHFS 1217/2018 3:42:20PM Page 4 COMPASS 5000.14 Build 850 Map Map vertical MD Inc Azl TVD TVDSS +N/ -S +EI -W DLS (usft) (1) V) (usft) (usft) (usft) (usft) Northing Easting ('1100') Section Survey Tool Name 6,25147 89.60 193.00 5,987.31 -5,890.31 2,47].1] 497.12 6,002,952.47 498,158.80 13.79 -2,477.17 MWD (6) 6,280.55 88.31 196.10 5,96184 -5,890.84 2,49.03 50,142 6,002,924.33 498.15149 11.54 -2,449.03 MWD (6) 6,310.42 88.37 198.56 5.962.71 -5,89111 2,420.53 -513.31 6,002,895.84 498.142.59 8.23 -2,420.53 MWD (6) 8.339.95 88.00 20126 5,963.64 -5,892.64 2.392.78 -523.36 6,002,868.09 498.132.54 922 -2.392.78 MWD (6) 8,37913 86.29 203.34 5,965.17 -5,894.17 2,364.34 535.03 6,002,839.66 498,120.87 874 -2,364.34 MWD 16) 8,401.17 8567 205.41 5,967.31 -5,896.31 2.336.68 -54]56 6,002,812.01 498.108.34 7.08 -2,336.66 MWD (6) 8,431.10 85.05 20821 5,969.73 -5,898.73 2,310.06 561.01 6,002,785.39 498,094.88 9.55 -2,310.06 MWD (6) 8,460.82 83.24 2 11 49 5.972.76 -5,901.76 2284.42 -575.72 6,002,759.76 496,080.17 1255 -2.284.42 MWD(6) &490.62 81.18 21154 5,976.80 -5,905.80 2.259.25 -591.16 6,002,73459 498,064.73 6.91 -2.259.25 MWD (6) 8,520.19 83.73 21352 5,980.68 -5,909.68 2.23454 -606.92 5,002,709.89 498,048.97 10.88 -2,234.54 MWD (6) 8,550.00 85.66 215.10 5,98344 -5,912.44 2,210.03 -623.65 6,002,68538 498,032.23 8.36 -2,210.03 MWD (13) 8,550.58 8570 215.13 5,983.48 -5,912.48 2,209.55 -623.98 6,002,684.90 498,03190 8.45 -2,209.55 MWD (6) 8,580.10 88.62 216.69 5,984.95 -5,913.95 2,185.68 -641.27 6.002,661.03 498,014.61 11.21 -2,185.68 MWD (6) 8,611.65 90.52 219.57 5,985.18 -5,914.18 2,160.86 -660.75 6,002,636.23 497.995.13 10.94 -2,160.86 MWD (6) 8,64147 89.5T 22254 5,986.16 -5,914.16 2.138.38 -680.33 6,002,613.75 497.975.54 10.46 -2,138.38 MWD (6) 8,671.60 87.97 224.54 5.985.81 -5,914.81 2.116.54 -701.08 6.002.591.92 497,95419 8.50 -2,116.54 MWD (6) 8,702.41 86.93 227.17 5,987.18 -5,916.18 2,095.11 -723.16 6,002,570.49 497.932.71 9.17 -2,095.11 MWD (6) 8,73158 87.45 229.33 5,988.61 -5,917.61 2.075.71 -744.90 6,002,551.10 497,910.97 7.61 -2.075.71 MWD (6) 8,76138 87.23 231.91 5,989.99 -5,918.99 2,056.83 -767.91 6,002,532.22 497,887.96 8.68 -2,056.83 MWD (6) 6,791.83 86.34 233.48 5.991.70 -5,920.70 2,03840 -792.D9 6,002,513.80 497.863.78 5.92 -2,038.40 MWD (6) 8,820.61 85.05 230.89 5,993.86 -5,922.86 2.02081 -01476 6,002,496.21 497,841.11 10.03 -2,020.81 MWD(6) 8,850.31 85.17 227.64 5,996.39 -5,925.39 2,001.50 -837.18 6,002,476.91 497.818.69 10.91 -2,001.50 MWD (6) 8,880.28 B6.75 226.35 5.998.50 -5,927.50 1,981.11 4159.04 6,002,456.53 497,796.82 660 -1,961.11 MWD (6) 8,910.16 88.46 223.46 5,999.75 -5,928.75 1,959.97 -060.11 6.002,435.39 497,775.75 1123 -1.959.97 MID (6) 8,940.98 90.71 22131 5,999.98 -5,926.98 1.937.21 -900.88 6.002.412.63 497,754.98 10.10 -1,937.21 MWD (6) 8,970.00 Was 220.04 5,999.12 -5,928.12 1,915.21 -919.79 6,002.390.64 497.736.07 8.08 -1,915.21 MWD (6) 9,000.52 92.31 217.88 5,997.79 -5,926.79 1,891.50 -93896 6,002,366.94 497,716.90 7.17 4,891.50 MWD (6) 9.031.30 9277 215.61 5,996.42 -5,925.42 1,866.86 -957.35 6,002,342.31 497.698.50 752 -1,866.86 MWD (6) 9.061.96 94.86 21487 5,994.38 -5,923.38 1,841.88 -97500 6.002.31133 497,680.84 7.23 -1.841,88 MWD(6) 9,091.01 95.13 21340 5.991.85 -5,920.85 1,81792 -991.24 6.002,293 38 497.664.60 5.13 -1,817.92 MWD (6) 9,121.00 93.87 211.30 5,989.50 -5,916.50 1.792.67 -1,007.24 6,002,268.13 497.64860 8.15 -1,792.67 MWD(6) Annotation SA ER F�UGHFS 1217/2018 3:42:20PM Page 4 COMPASS 5000.14 Build 850 Survey ConocoPhillips ConocoPhillips Definitive Survey Report company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 31-1-13 Project Kuparuk River Unit TVD Reference: 3H -13A@ 71.00usft (31-1-13A) Site: Kuparuk 3H Pad MD Reference: 3H -13A Q 71,00usft (3H -13A) Well: 31-1-13 North Reference: True Wellbore- 3H-13AL1-01PB1 Survey Calculation Method: Minimum Curvature Design 3H-13AL1-01P81 Database: EDT 14 Alaska Production Survey BA ER ES U9H 12/712078 3:42:20PM Page 5 COMPASS 5000.14 Build 650 Map Map Vertical MD Inc Azl ND NDSB +W -S +E/.W DES (usft) (°) (°) Wait) (usft) (usft) rush) Northing Easting (-1100-) Section Survey Tool Name Annotation (ft) (ft) (ft) 9.15121 93.97 208.55 5,987.44 -5,916.44 1,766.55 -1.022.27 6,002,242.02 497,633.57 9.09 1,766.55 MWD (6) 9.181.04 94.21 20566 5,985.31 -5.914.31 1.740.07 -1,035.83 6,002,215.54 497,620.01 9.70 -1,740.07 MWD (6) 9,210.83 94.12 202.62 5.983.14 -5,912.14 1.712.96 -1,0.17.98 6,002,188.43 497.607.86 10.18 -1,712.96 MWD (6) 9,241.38 91.38 198.32 5,981.68 -5,910.68 1,684.38 -1,058.64 6,002,159.86 497.597.18 1668 -1,68438 MWD (6) 9,271.82 93.75 198.08 5,980.32 -5,909.32 1.655.49 -1,068.14 6,002.130.98 497,587.68 783 -1,655.49 MWD (6) 9,30026 93.93 195.10 5,978.41 -5,907.41 1,628.30 -1,076.24 6,002,103.79 497.579.58 10.47 -1,628.30 MWD (6) 9,330.80 94.24 192.72 5,976.23 -5,905.23 1.598.73 -1,083.57 6,002,07423 497,572.25 784 -1,596.73 MWD (6) 9,359.45 94.61 190.50 5,974.02 -5,903.02 1,570.76 -1,089.31 6,002,046.25 497,586.50 7.83 -1.570.76 MWD (6) 9,390.42 93.22 186.71 5,971.91 -5,900.91 1,540.21 -1,093.94 6,002,015.71 497,561.87 13.01 -1,540.21 MWD (6) 9,41996 93.50 184.04 5,970.18 -5,899.18 1,510.83 -1,096.70 6,001,966.34 497,559.10 9.07 -1,510.83 MWD (6) 9,450.06 93.25 181.04 5,968.40 -5,897.40 1,480.84 -1,098.03 6,001,956.35 497,557.77 9.99 -1,460.84 MWD (6) 9,480.34 93.54 17851 5,966.61 -5,895.61 1,45062 -1,097.91 6,001,926.13 497,557.88 8.40 -1,450.62 MWD (6) 9,51197 9390 177.78 5,964.56 -5,893,56 1,419.07 -1,096.89 6,001,894.58 497.558.90 2.57 -1,419.07 MWD(6) 9.539.76 93.59 180.45 5,96214 -5,891.74 1,39134 -1.096.46 6,001,86686 497,559.32 9.65 -1,391.34 MWD (6) 9,570.12 92.86 182.37 5,96104 -5,890.04 1,361.04 -1,097.21 6,001,836.56 497,558.57 6.76 -1,361.04 MWD (6) 9,60000 93.87 186.56 5,95928 -5.888.28 1.331.31 -1099.53 6,001,80684 497,556.24 14.40 -1,331.31 MWD (6) 9,629.96 93.29 188.91 5,95741 -5,686.41 1.301.69 -1,103.55 6,001,777.21 497.552,21 8.06 -1,301.69 MWD (6) 9,660.26 9319 19181 5.955.54 -5,884.54 1,271.94 -1108.99 6,001,747.47 497,546.77 9.69 -1,271.94 MWD (6) 9,690.03 9141 19301 5,954.19 -5,883,19 1,242.90 -1,115.38 6,001,718.43 497.540.37 8.95 -1,242,90 MWD (6) 9,720.42 88.25 194.09 5,954.28 -5,883.28 1,213.36 -1,122.50 6,001,688.90 497,533.25 10.99 -1,213.36 MWD (6) 9,75043 86.28 195.29 5,95511 -5,884.71 1,184.36 -1130.10 6.001,659.91 497,525.64 7.68 A18436 MWD (6) 9,780.62 85.85 197.86 5,957.78 -5,886.78 1,155.50 -1,138.69 6,001,631.05 497,517.05 8.61 -1,155.50 MWD (6) 9,815.70 85.45 200.31 5,96044 -5,889.44 1.122.45 -1150.13 6.001,598.00 497,505.61 7.06 -1,122.45 MWD (6) 9,850.32 86.41 203.23 5,96290 -5,891.90 1,090.38 -1.162.93 6,001,565.94 497,492.80 8.86 -1,090.38 MWD(6) 9,880.78 87.02 205.91 5,964.65 -5,893.65 1,062.73 -1,175.58 6,001,538.29 497480.15 9.01 -1.062.73 MWD (6) 9.910.58 86.65 208.32 5,966.29 -5,895.29 1.036.24 -1,189.14 6,001511.81 497.466.59 8.17 -1,036.24 MWD (6) 9,941.06 85.05 20958 5,968.5D -5,897.50 1,009,64 -1.203.85 6.001,485.22 497,45167 6.67 -1,009.64 MWD (6) 9,970.42 83.82 210.72 5,97135 -5,900.35 984.38 -1.218.53 6,001,459.96 497,437.19 510 -984.38 MWD (6) 10,001.04 84.34 208.67 5.974.51) -5,903.50 957.92 -1,233.62 6,001,433.51 497422.10 6.87 -957.92 MWD (6) 10,030.25 86.25 206.80 5,976.90 -5,90590 932.16 -1.247.16 6.001.407 75 497,408.55 9.14 -932.16 MD (6) 10,060.29 8840 205.12 5,97830 5,907.30 905.18 -1,260.30 6,001.380.77 497,395.41 908 -905.18 MWD (6) BA ER ES U9H 12/712078 3:42:20PM Page 5 COMPASS 5000.14 Build 650 y, ConocoPhillips 6A ERF UG ConocoPhillips Definitive Survey Report " IIES Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3H-13 Project: Kuparuk River Unit TVD Reference: 31-1-13A Q 71.O0usR (31-1-13A) Site: Kuparuk 3H Pad MO Reference 3H-13A @ 71.O0usR (31-1-13A) Well 31-1-13 North Reference: True Wellbore: 3H-13AL1-01PB1 Survey Calculation Method: Minimum Curvature Design: 3H-13AL1-01PB1 Database: EDT 14 Alaska Production Survey Annotation 12/7/2018 3:42:20PM Page 6 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc ANTVD NDSS +N/ -S + DLS (usR) (°) (°) (usR) (usR) (usR) lush) usR) Northing Eestin5 Section Survey Tool Name (ft) (R) (R) (R) 10,090.11 6865 201.56 5,979.07 -590807 877.81 -1,272.10 6,001,353.41 497,383.60 11.96 -877.81 MWD (6) 10,120.21 90.18 200.29 5,979.38 -5.90838 849.70 -1,282.85 6,001,325.31 497.372.95 5.61 -849.70 MWD (6) 10,150.66 91.32 196.85 5,978.98 -5.907.98 821.01 -1,293.05 5001,296.62 497,362.65 6.03 -821.01 MWD (6) 10,180.06 9169 196.32 5,978.21 -5,907.21 793.00 4,301.93 6,001,268.61 497.35376 8.69 -793.00 MWD (6) 10,210.35 93.04 194.40 5,976,96 -5,905.96 763.82 -1,309.95 6,001,239,94 497.345.74 7.74 -763.82 MWD (6) 10,240.18 91.69 19205 5.975.72 -5,904.73 734.81 -1,31676 6,001,210.43 497.338.92 9.08 -734.81 MWD (6) 10,270.36 91.50 189.53 5,974.88 -5,903.88 705.17 -1.322.41 6,001,180.80 497,333.27 8.37 -705.17 MWD (6) 10,300.25 9246 186.41 5,973.85 -5,902.85 675.59 -1,326.55 6,001,15122 497.329.12 1092 -675.59 MWD (6) 10,330.36 91.84 183.74 5,972.72 -5,90172 645.63 -1,329.21 6,001,121.26 497,326.46 9.10 -645.63 MWD (6) 10,359.92 92.74 182.35 5,971.54 -5,900.54 616.13 -1,330.78 6,001,091.77 497,324.88 5.60 -616.13 MWD(6) 10,391.15 94.36 185.05 5,969.61 -5,898.61 585.03 -1,332.79 6,001,060.67 497.322.86 10.07 -585.03 MWD (6) 10,419.73 94.67 18704 5,967.36 -5,896.36 556.70 -1,33519 6,001,032.34 497,319.86 7.03 -556.70 MWD (6) 10,450.46 94.40 190.30 5,964.93 -5,893.93 526.42 -1,340.41 6,001,002.07 497,315.24 10.61 -526.42 MWD (6) 10,481.54 94.27 19263 5.962.58 -5,891.58 496.05 -1.34657 6,000,971.70 497,309.07 7.49 496.05 MWO(6) 10,509.84 93.78 19449 5,960.59 -5,889.59 468th -1,353.19 6,000,944.26 497,302.45 618 468.61 MWO(6) 10,540.07 93.56 196.85 5,958.65 -5,887.65 439.55 -1,361.34 6,000,915.22 497,294.30 7.82 43956 MWD (6) 10,570.76 92.64 198.84 5,957.00 -5,886.00 410.39 -1,37073 6,000,88506 497,284.90 7.13 410.39 MWD (6) 10.600.40 91.32 201.59 5,955.97 -5,884.97 382.60 -1380.96 6,000.858.27 497,27666 10.29 -382.60 MWD (6) 10,630.15 90.77 204.03 5,955.43 -5,884.43 355.18 1,39249 6,000,830.86 497,263.13 8.41 -35518 MWD (6) 10,659.54 90.95 205.90 5,95499 -5,883.99 328.54 -1,404.90 6,000,804.22 497,253.72 6.39 -328.54 MWD (0) 10,69900 90.95 205.90 5,954.33 -5,883.33 293.05 4,422.13 6,000768.74 497,23349 0.00 -293.05 PROJECTED to TD Annotation 12/7/2018 3:42:20PM Page 6 COMPASS 5000.14 Build 85D 21 8136 I BH30 Eli %' PRINT DISTRIBUTION LIST 114 GHES GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 3H-13AL1-01PB1 FIELD Greater Kuparuk Area COUNTY North Slope Borough 13:I�7F�i7C�51 Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(d)bakerhughes.com ce sign and return one copy of this transmittal form to: xoPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) G Street. brace. Alaska 99510 LOG TYPE GR - RES LOG DATE November 19, 2018 TODAYS DATE December 11, 2018 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION t BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage. AK 99510 3 ExxonMobil, Alaska .Ann: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4State of Alaska -AOGCC .Atm: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division ofOil & Gas **' Ann: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6, BP Exploration (Alaska) Inc. Petrotechnical Data Center, IR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 FIELD I FINAL CD/DVD FINAL PRELIM I (CGMII SURVEY REPORT OGS LOGS Final Surveys) (comp # OF PRINTS9 Ur rKill # OF COPIES 1# OF COPIES I# OF COPIES 01 01 0 10 0 01 11 1 101 0 0 0 1 0 0 TOTALS FOR THIS PAGE: 0 1 3 0 0 BA ER BAT a GE company El Date: December 7, 2018 Abby Bell AOGCC 333 West 7" Ave, Suite 100 Anchorage, Alaska 99501 118136 30081 Letter of Transmittal Michael Soper Baker Hughes, a GE Company 795 East 94" Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3H-13AL1PB1 3H-13AL1PB2 3H-13AL1-01PB1 3H-13AL1PB3 3H-13AL1 3H-13AL1-02 3H-13AL1-03 (7) Total prints RECEIVED DEC 10 2018 AOGCC Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Applications Engineer Michael.Soper@BakerHughes.com IV" ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3H Pad 3H-13AL1-01PB1 50-103-20089-72 Baker Hughes INTEQ Definitive Survey Report 07 December, 2018 BA ER F�UGHES a GE company 218136 30082 ConocoPhillips Company: Con000Phillips(Alaska) Inc.-Kup2 Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 3H-13 Wellbore: 31-1-13ALl-01 P91 Design: 3H-13AL1-01 PB1 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Project Kuparuk River Unit, North Slope Alaska, United States 70° 24'45,119 N Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) 0.00 usft Map Zone: Alaska Zone 04 Field Strength Well 3H-13 (nT) Well Position +N/ -S 0.00 usft Northing: +E/ -W 0 00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 31-1-13AL1-01PB1 Magnetics Model Name Sample Date BGGM2018 11/1/2018 Design 3H-13ALl-01 PB1 Audit Notes: version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) (usft) 71.00 Well 3H-13 31-1-13A @ 71.00usft (31-1-13A) 3H -13A @ 71.00usft (31-1-13A) True Minimum Curvature EDT 14 Alaska Production Mean Sea Level Using Welt Reference Point Using geodetic scale factor 6, 000,475.46usft 498,655.42usft usft Declination l°) 16.83 Tie On Depth: 7,702.02 +N/ -S (usft) 000 •E/ -W (usft) 0.00 BA GU XES V r�..�. i Latitude: 70° 24'45,119 N Longitude: 150° 0'39.419 W Ground Level: 0.00 usft Dip Angle Field Strength (°) (nT) 80.91 57,435 3 9 9 Direction 180.00 121712018 3:42:20PM Page 2 COMPASS 5000.14 Build 85O ConocoPhillips ER tr ConocoPhilll ` "°°S In Definitive Survey Report Company: Project: Site: Well: Wellbore: Design: Survey Program ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3H Pad 3H-13 3H-13AL1-01PB1 3H-13AL1-01PB1 Date Local Go -ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3H-13 3H -13A @ 71.00usft (31-1-13A) 3H -13A @ 71,OOusft (31-1-13A) True Minimum Curvature EDT 14 Alaska Production From To Survey (usft) (usft) Survey(Wellbors) Tool Name Description Start Date 95.00 5,900.00 3H-13 (31-1-13) GCT -MS Schlumberger GCT multishot 1/12/2001 6,113.56 7,260.49 3H-13AATDB(31-1-13A) MWD MWD -Standard 9/18/2001 7,340.00 7,390.33 3H-13AL1P61 MWD-INC(3H-13AL1PB1 MWD -INC -ONLY MWD -INC -ONLY -FILLER 10/24/2018 7,427.83 7,702.02 3H-13AL1PB1 MWD(3H-13AL1PB1) MWD MWD -Standard 10/24/2018 7,730.00 7,820.91 3H-13AL1-01PS1 MWD-INC(3H-13AL1- MWD -INC -ONLY MWD -INC -ONLY -FILLER 11/1/2018 7,854.84 10,659.54 31-1-13AL1-01 PB1 MWD (3H-13AL1-01 P8 MWD MWD -Standard 11/1/2018 7,702.02 91.78 165.22 6,005.05 -5,934.05 3,015.87 Survey Survey 4 End Date C![ i E 10/24/2018 3 10/27/2018 S 11/1/2018 11/4/2018 Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth Interpolated Azimuth 12/7/2018 3:42: 20PM Page 3 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +NFS +EI -W DLS (usft) (°) (°). (usft) (usft) (usft) (usft) Northing Easting (°1100') Section Survey Tool Name (ft) (ft) (ft) 7,702.02 91.78 165.22 6,005.05 -5,934.05 3,015.87 -544.15 6,003,491.12 498,111.87 8.43 -3,015.87 MWD (4) 7,730.00 92.11 168.61 6,004.10 -5,933.10 2,98863 -537.82 6,003,463.89 498,118.19 12.17 -2,98863 MWD-INC_ONLY (5) 7,760.26 94.24 165.00 6,002.42 5,93142 2,959.22 -530.93 6,003,434.48 498,125.08 13.84 -2,95922 MM -INC _ONLY (5) 7,790.40 97.39 163.00 5,999.37 5,928.37 2,930.40 -522.66 6,003,40567 498,133.34 12.36 -2,93040 MWD -INC _ONLY (5) 7,820.91 97.51 164.50 5,99541 -5,924.41 2,901.36 -514.20 6,003,376.62 498,141.79 4.89 -2,901.36 MWD -INC ONLY (5) 7,854.84 98.04 165.39 5,990.82 -5,919.82 2,868.90 -505.47 6,003,344.16 498,150.52 3.03 -2,868.90 MWD (6) 7,881.16 99.06 168.46 5,986.91 -5,915.91 2,843.55 -499.58 6,003,318.81 498,156.40 12.17 -2,843.55 MWD (6) 7,910.12 97.17 169.93 5,982.82 -5,911.82 2,815.39 494.20 6,003,290.66 498,161.77 8.24 -2,815.39 MWD (6) 7,946.23 96.93 170.51 5,978.39 -5,907.39 2,780.07 -088.12 6,003,255.34 498,167.85 1.73 -2,78007 MM (6) 7,974.74 97.05 174.64 5,974.92 -5,903.92 2,752.02 484.46 6,003,227.29 498,171.50 14.38 -2,752.02 MWD (6) 8,005.64 97.82 177.59 5,970.92 -5,899.92 2,721.45 482.38 6,003,196.73 498,17357 9.79 -2,72145 MWD (6) 8,035.25 97.36 179.22 5,967.01 -5,896.01 2,692.11 481.57 6,003,167.39 498,174.38 5.67 -2,692.11 MWD (6) 8,066.57 94.73 18062 5,963.71 -5,892.71 2,660.97 481.53 6,003,136.25 498,174.42 9.50 -2,660.97 MWD (6) 8,100.46 91.53 18083 5,961.86 -5,890.86 2,627.14 481.95 6,003,102.42 498,17399 9.46 -2,627.14 MWD (6) 8,130.66 90.61 182.09 5,961.29 -5,890.29 2,596.96 A82.72 6,003,072.24 498,173.21 5.17 -2,596.96 MM (6) 8,160.65 90.77 184.71 5,960.93 -5,889.93 2,567.02 -0 ,50 6,003,042.31 498,171.43 8.75 -2,567.02 MWO(6) 8,190.51 89.57 186.29 5.%084 -5,88984 2,537.30 4x7.36 6,003,012.60 498,166.56 6.64 -2,537.30 MWD(6) 8,220.35 89.54 188.71 5,961.08 -5,890.08 2.507.71 -49126 6,002,983.01 498,164.66 8.11 -2,50771 MWD (6) Survey 4 End Date C![ i E 10/24/2018 3 10/27/2018 S 11/1/2018 11/4/2018 Annotation TIP KOP Interpolated Azimuth Interpolated Azimuth Interpolated Azimuth 12/7/2018 3:42: 20PM Page 3 COMPASS 5000.14 Build 85D ConocoPhillips B ER ES ConocoPhillips Definitive Survey Report Company: Project: Site: Well: Wellbore: Design: Survey^ ConocoPhillips (Alaska) Inc.-Kup2 Kuparuk River Unit Kuparok 3H Pad 3H-13 31-1-13ALl-01 PB1 3H-13AL1-01PB1 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 3H-13 3H -13A @ 71.00usft (3H -13A) 3H -13A @ 71.00usft (31-1-13A) True Minimum Curvature EDT 14 Alaska Production 121712018 3:42:20PM Page 4 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azl TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (1 (1) (usft) (usft) (usft) (usft) C/100') Survey Tool Name Annotation (ft) (ft) (ft) 8,251.47 89.60 193.00 5,961.31 -5,890.31 2,477.17 -497.12 6,002,952.47 498,158.80 13.79 -2,477.17 MWD(6) 8,280.55 88.31 196.10 5,961,84 -5,890.84 2,449.03 504.42 6,002,924.33 498,151.49 11.54 -2,449.03 MWD (6) 8,310.42 88.37 198.56 5,962.71 5,891.71 2,420.53 513.31 6,002,89584 498,142.59 823 -2,420.53 MWD(6) 8,339.95 88.00 201.26 5,963.64 -5,892.64 2,392.78 523.36 6,002,868.09 498,132.54 922 -2,392.78 MWD (6) 8,370.73 86.29 203.34 5,965.17 -5,894.17 2,364.34 -535.03 6,002,83966 498,120.87 8.74 -2,364.34 MWD (6) 8,401.17 85.67 205.41 5,967.31 5,896.31 2,33668 -547.56 6,002,812.01 498,108.34 7.08 -2,336.68 MWD (6) 8,431.10 85.05 208.21 5,96973 5,89873 2.310.06 -561.01 6,002,785.39 498,094.88 9.55 -2,310.06 MIND (6) 8,460.82 83.24 211.49 5,972.76 5,90176 2,284.42 -575.72 6,002,759.76 498,080.17 12.55 -2,284.42 MWD (6) 8,490.62 81.18 211.54 5,976.80 -5,90580 2,259.25 .591.16 6,002,734.59 498,064.73 6.91 -2,259.25 MWD (6) 8,520.19 83.73 213.52 5,980.68 5,909.68 2,234.54 506.92 6,002,709.89 498,048.97 10.88 -2,234.54 MWD (6) 8,550.00 85.66 215.10 5,983.44 -5,91244 2,210.03 823.65 6,002,685.38 498,032.23 8.35 -2,210.03 MWD (6) 8,550.58 8570 215.13 5,983.48 -5,91248 2,209.55 823.98 6,002,684.90 498,031.90 8.45 -2,209.55 MWD (6) 8,500.10 88.62 21669 5,984.95 5,913.95 2,185.68 841.27 6,002,661.03 498,014.61 11.21 .2,1 85.68 MWD (6) 8,611.65 90.52 219.57 5,985.18 -5,914.18 2,160.86 860.75 6,002,636.23 497,995.13 10.94 -2,160.86 MWD(6) 8,641.47 89.57 222.54 5,985.16 -5,914.16 2,138.38 880.33 6,002,613.75 497,975.54 10.46 -2,138.38 MWD (6) 8,671.60 87.97 224.54 5,985.81 -5,914.81 2,116.54 -701.08 6,002,591.92 497,95479 8.50 -2,116.54 MM (6) 8,702.41 85.93 227.17 5,987.18 -5,916.18 2,095.11 -723.16 6,002,570.49 497,932.71 9.17 -2,035.11 MWD (6) 8,731.58 87.45 229.33 5,988.61 -5,917.61 2,075.71 -749.90 6,002,55110 497,91097 7.61 -2,075.71 MWD (6) 8,761.38 87.23 23191 5,989.99 -5,918.99 2,056.83 -767.91 6,002,532.22 497,887.96 868 -2,056.83 MWD (6) 8,791.83 86.34 233.48 5,99170 -5,92070 2,038.40 -792.09 6,002,513.80 497,863.78 5.92 -2,038.40 MWD (6) 8,820.61 85.05 230.89 5,993.86 -5,922.86 2,020.81 814.76 6,002,496.21 497,841.11 10.03 -2,020,81 MIND (6) 8,850.31 85.17 227.64 5,996.39 5,925.39 2,001.50 -837.18 6,002,476.91 497,818.69 10.91 -2,001.50 MIND (6) 8,880.28 86.75 226.35 5,998.50 -5,927.50 1,981.11 -859.04 6,002,456.53 497,796.82 6.80 -1,981.11 MWD(6) 8,910.16 88.46 223.46 5,999.75 -5,928.75 1,959.97 -880.11 6,002,435.39 497,775.75 11.23 -1,959.97 MM (6) 8,940.98 90.71 221.31 5,999.98 -5,928.98 1,937.21 -900.88 6,002,412.63 497,754.98 10.10 -1,937.21 MWD (6) 8,970.00 92.68 220.04 5,999.12 -5,928.12 1,915.21 -919.79 6,002,390.64 497,736.07 8.08 -1,915.21 MWD(6) 9,00,52 92.31 217.88 5,997.79 -5,926.79 1,891.50 -938.96 6,002,366.94 497,716.90 7.17 -1,891.50 MWD (6) 9,031.30 92.77 21561 5,996.42 -5,925.42 1,866.85 -957.35 6,002,342.31 497,698.50 7.52 -1,866.86 MWD(6) 9,061.96 94.86 214.87 5,994.38 -5,92338 1841.88 -975.00 6,002.31733 497,680.84 7.23 -1,841.88 MWD (6) 9,091.01 95.13 213.40 5,991,85 -5,920.85 1,817.92 -991.24 6,002,293.38 49765460 5.13 -1,817.92 MWD(6) 9,121.00 93.87 21130 5,989.50 -5,918.50 1792.67 -1007.24 6,002,268.13 497648.60 8.15 -179267 MWD (6) 121712018 3:42:20PM Page 4 COMPASS 5000.14 Build 85D ConocoPhillips ER ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 31-1-13 Project: Kupamk River Unit TVD Reference: 31-1-13A Q 71.00usft (3H -13A) Site: Kuparuk 3H Pad MD Reference: 31-1-13A @ 71.00usft (31-1-13A) Well: 31-1-13 North Reference: True Wellbore: 3H-13AL1-01PB1 Survey Calculation Method: Minimum Curvature Design: 3H-13AL7-01PB7 Database: EDT 14 Alaska Production Survey 121712018 3:42:20PM Page 5 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W DLS (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting (°/100') Section Survey Too] Name Annotation (ft) (ft) (ft) 9,151.21 93.97 20855 5,98744 -5,91644 1,766.55 -1,022.27 6,002,242.02 497,633.57 9.09 -1,766.55 MWD (6) 9,181.04 94.21 205.66 5,985.31 5,914.31 1,740.07 -1,035.83 6,002,215.54 497,620.01 9.70 -1,740.07 MWD (6) 9,210.83 94.12 202.62 5,983.14 -5,912.14 1712.96 -1,047.98 6,002,188.43 497,607.86 10.18 -1,712.96 MWD(6) 9,241.38 91.38 198.32 5,98168 -5,910.68 1,684.38 -1,05864 6.002.159.86 497,597.18 16.68 -1,684.38 MWD (6) 9,271.82 9335 198.08 5,960.32 5,909.32 1,655.49 -1,068.14 6,002,13098 497,587.68 7.83 -1,655.49 MWD (6) 9,300.26 93.93 195.10 5,978.41 5,907.41 1,628.30 -1,076.24 6,002,10379 497,579.58 10.47 -1,628.30 MWD (6) 9,330.80 94.24 192.72 5,976.23 -SX523 1,59873 -1,083.57 6,002,074.23 497,572.25 7.84 -1,598.73 MWD (6) 9,359.45 94.61 190.50 5,974,02 5,90302 1,570.76 -1,089.31 6,002,04625 497,566.50 7.83 -1,570.76 MWD (6) 9,390.42 93.22 18671 5,971.91 5,900.91 1,540.21 -1,093.94 6,002,015.71 497,561.87 13.01 -1,540.21 MWD (6) 9,419.98 93.50 184.04 5,970.18 5,899.18 1,510.83 -1,096.70 6,001,986.34 497,559.10 9.07 -1,510.83 MWD(6) 9,450.06 93.25 181.04 5,96840 5,89740 1,480.84 -1,098.03 6,001,956.35 497,557.77 9.99 -1,480.84 MWD (6) 9,480.34 93.54 178.51 5,966.61 -5,89561 1,450.62 -1,097.91 6,001,926.13 497,557.88 8.40 -1,450.62 MWD (6) 9,511.97 93.90 177.78 5,964.56 -5,893.56 1,419.07 -1,096.89 6,001,894.58 497,558.90 2.57 -1,419.07 MWD(6) 9,539.76 93.59 18045 5,962.74 5,891.74 1,391.34 -1,096.46 6,001,866.86 497,559.32 9.65 -1,391.34 MWD (6) 9,570.12 92.86 182.37 5,961.04 -5,890.04 1,361.04 -1,097.21 6,001,836.56 497,558.57 6.76 -1,361.04 MWD (6) 9,600.00 93.87 18658 5,959.28 -5,888.28 1,331.31 -1,099.53 6,001,806.84 497,556.24 14.40 -1,331.31 MWD (6) 9,629.96 93.29 18891 5,957.41 -5,88641 1,301.69 -1,103.55 6,001,777.21 497,552.21 8.06 -1,301.69 MWD (6) 9,660.26 93.79 191.81 5,955,54 -5,884.54 1,271.94 -1,108.99 6,001,74747 497,546.77 9.69 -1,271.94 MM (6) 9,690.03 91.41 193.01 5,954.19 -5,883.19 1,242.90 -1,115.38 6,001,718.43 497,540.37 8.95 -1,242.90 MWD (6) 9,720.42 88.25 194.09 5,954.28 -5,883.28 1,213.36 -1,122.50 6,001,688.90 497,533.25 10.99 -1,213.36 MM (6) 9,750.43 86.28 19529 5,955.71 -5,884.71 1,184.36 -1,130.10 6,001,659.91 497,525.64 7.68 -1,184.36 MWD (6) 9,780.62 85.85 197.86 5,957.78 -5,886.78 1,155.50 -1,138.69 6,001,631.05 497,517.05 8.61 -1,155.50 MWD (6) 9,815.70 8545 20031 5,960.44 -5,889.44 1,122.45 -1,150.13 6,001,598.00 497,505.61 7.06 -1,122.45 MM (6) 9,850.32 86.41 203.23 5,962.90 -5,891.90 1,090.38 -1,162.93 6,001,565.94 497,492.80 8.86 -1,090.38 MM (6) 9,880.78 87.02 205.91 5,964.65 5,893.65 1,062.73 -1,175.58 6,001,53829 497,480.15 9.01 -1,062.73 MWD(6) 9,910.58 86.65 208.32 5,966.29 -5,895.29 1,036.24 -1,189.14 6,001,51161 497,465.59 8.17 -1036.24 MWD (6) 9,941.06 85.05 209.58 5,968.50 5,897.50 1,009.64 -1,20385 6,001,48522 497,451.87 6.67 -1,009.64 MWD (6) 9,97042 83.82 21072 5,971.35 -5,900.35 984.38 -1,218.53 6,001,459.96 497,437.19 5,70 -964.38 MWD (6) 10,001.04 84.34 208.67 5,974.50 5,903.50 95792 -1,233.62 6,001,433.51 497,422.10 6.87 -957.92 MAD (6) 10,030.25 86.25 206.80 5,976.90 -5,905.90 932.16 -1,247.16 6.001,407.75 497,40855 9.14 -932.16 MM (6) 10%0.29 88.40 205.12 5,978.30 -5,907.30 905.18 -1,260.30 6.001.380.77 497,395.41 9.08 -905.18 MWD (6) 121712018 3:42:20PM Page 5 COMPASS 5000.14 Build 85D Survey ConocoPhillips BA ER SO t COtIOCOPi11ll1 Definitive Survey Report VT Company: _ ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 31-11-13 Project: Kuparuk River Unit TVD Reference: 31-1-13A @ 71.00usft (3H -13A) Site: Kuparuk 3H Pad MD Reference: 31-1-13A @ 71.00usft (31-1-13A) Well: 31-1-13 North Reference: True s Wellbore: 3H-13AL1-01PB7 Survey Calculation Method: Minimum Curvature i. Design: 3H-13AL1-01PBl Database: EDT 14 Alaska Production MD Inc Azi Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S -E/-W DLS (usft) (°) (°) (usft) (usft) (usft) (usft) Northing Easting (°/100') Section Survey Tool Name ARROt8ti0D IPo Ift) (ft) 10,090.11 86.65 201.56 5,979.07 -5,90807 877.81 -1,272.10 6,001,353.41 497,363.60 11,96 -877.81 MWD (6) 10,120.21 90.18 200.29 5,979.38 -5,908.38 849.70 -1,282.85 6,001,325.31 497,372.85 6.61 -849.70 MIND (6) 10,150.66 91.32 198.85 5,978.98 -5,907.98 821.01 -1,293.05 6,001,296.62 497,362.65 6.03 -821.01 MWD (6) 10,180.06 91.69 196.32 5,978.21 -5,907.21 793.00 -1,301.93 6,001,268.61 497,353.76 8.69 -793.00 MWD (6) 10,210.35 93.04 194.40 5,976.96 -5,905.96 763.82 -1,309.95 6,001,239.44 497,345.74 7.74 -763.82 MWD (6) 10,240.18 91.69 19205 5,975.72 -5,904.73 734.81 -1,316.76 6,001,210.43 497,338.92 9.08 -734.81 MIND (6) 10,270.36 91.50 18953 5,974.88 -5,903.88 705.17 -1,322.41 6,001,180.80 497,333.27 8.37 -705.17 MWD (6) ! 10,300.25 92.46 18641 5,973.85 -5,902.85 675.59 -1,326.55 6,001,151.22 497,329.12 10.92 .675.59 MIND (6) 10,330.36 91.84 183.74 5,972.72 5,901.72 645.63 -1,329.21 6,001,121.26 497,326.46 9.10 54563 MWD (6) 10,359.92 92.74 182.35 5,971.54 -5,900.54 616.13 -1,330.78 6,001,091.77 497,324.88 5.60 .616.13 MWD (6) 10,391.15 94.36 18505 5,969.61 -5,89861 585.03 -1,332.79 6,001,060.67 497,322.85 10.07 585.03 MWD (6) 10,419.73 94.67 187.04 5,967.36 -5,896.36 556.70 -1,335.79 6,001,032.34 497,319.86 7.03 556.70 MM (6) 10,450.46 94.40 190.30 5,964.93 5,893.93 526.42 -1,340.41 6,001,002.07 497,315.24 10.61 52642 MWD (6) 10,481.54 9427 192.63 5,962.58 5,891.58 4%.05 -1,346.57 6,000,971.70 497,309.07 7.49 496.05 MWD(6) 10,509.84 93.78 194.49 5,960.59 5,889.59 466.61 -1,353.19 6,000,944.26 497,302.45 6.78 -468.61 MWD (6) 10,540.07 93.56 196.85 5,958.65 -5,887.65 439.56 -1,361.34 6,000,915.22 497,294.30 7,82 -039.56 MWD (6) 10,570.76 92.64 198.84 5,957.00 5,886.00 410.39 -1,370.73 6,000,886.06 497,284.90 7.13 410.39 MVM (6) 10,600.40 91.32 201.59 5,955.97 5,884.97 382.60 -1,380.96 6,000,858.27 497,274.66 10.29 38260 MWD (6) 10,630.15 90.77 204.03 5,95543 -5,884.43 355.18 -1,392.49 6,000,830.86 497,263.13 8.41 355.18 MWD(6) 10,659.54 90.95 205.90 5,954.99 5,883.99 328.54 -1,404.90 6,000,804.22 497,250.72 6.39 328.54 MWD (6) 10,699.00 90.95 205.90 5,954.33 5,88333 293.05 -1,422.13 6,000,768.74 497,233.49 0.00 -293.05 PROJECTED to TD 12/72018 3:42:20PM Page 6 COMPASS 5000.14 Build 85D r THE STATE Alaska Oil and Gas °fALASKA Conservation Commission GOVERNOR BILL WALKER James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3H-13AL1-01 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-136 Surface Location: 1182' FNL, 281' FWL, SEC. 12, T12N, R8E, UM Bottomhole Location: 946' FNL, 760' FEL, SEC. 11, T12N, R8E, UM Dear Mr. Ohlinger: 333 West 7th Avenue Anchorage, Alaska 99501 Main: 907.297.1433 Fax: 907.276.7542 www.aogcc.olasko.gov Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 196-197, API No. 50-103-20089- 01-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount Commissioner St DATED this'31 day of October, 2018. � •1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 1a. Type of Work: • tb. Proposed Well Class: Exploratory -Gas ❑ Service- WAG LJ Service - Disp ❑ 1c. Specify if well is. proposecLfor. Drill ❑ Lateral Q Stratigraphic Test ❑ Development - Oil /0 Service- Winj ❑ Single Zone El ' Coalbed Gas ❑ Gas Hydrates ❑ Reddll ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 5952180 KRU 3H-13AL1-01 3. Address: 6. Proposed Depth: 12. Field/Pool(s): , P.O. Box 100360 Anchorage, AK 99510-0360 MD: 10600' TVD: 5976' Kuparuk River Field / Kuparuk River Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 1182' FNL, 281' FWL, Sec 12, T12N, RSE, UM ADL 25531 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 3488' FNL, 239' FEL, Sec 02, T12N, R8E, UM LONS 84-134 & LONS 84-149 10/24/2018 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 946' FNL, 760' FEL, Sec 11, T12N, R8E, UM 2560 4820' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 76' - 15. Distance to Nearest Well Open Surface: x- 498655 y- 6000475 - Zone- 4 GL / BF Elevation above MSL (ft): 34' to Same Pool: 703', 3H -12A 16. Deviated wells: Kickoff depth: 7750 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 99 degrees Downhole: 4897 - Surface: 4299 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 3170' 7430' 6016' 10600' 5976' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 7755' 6203' N/A 7653' 6150' N/A Casing Length Size Cement Volume MD TVD Conductor/Structural 74' 16" 245 sx AS 1 110' 110' Surface 3037' 9-5/8" 1300 sx ASH 1, 400 sx G, 70 sx ASI 3072' 2929' Production 5937' 7" 300 sx G, 175 sx AS 1 5970' 5173' Liner 1947' 3-1/2" 311 sx G 7755' 6203' Perforation Depth MD (ft): 7229'- 7249', 7258'- 7308' Perforation Depth TVD (ft): 5927'- 5938', 5943'- 5969' 7356'- 7366', 7372'- 7380' 5994' - 6000', 6002' - 6007' Hydraulic Fracture planned? Yes El No q 20. Attachments: Property Plat ❑ BOP Sketch Drilling v. Depth ot Shallow Hazard Divertter Sketch e Report B Drilling Fluid Program e 20 AAC 25.050 requ emenfa 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Keith Herring Authorized Name: James Ohlinger Contact Email: Keith. E. Herrin c0 .com Authorized Title: Staff CTD Engineer Phone: 907-263-4321 6Contact Authorized Signature: Date: 10 0106 Commission Use Only Permit to Drill q API Number: Number: J., U-�136 50- oQ �.O Permit Approv Date: ��Hth See cover letter for other requirements.Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbe-e, gas hydrates, or gas contained in shales: Other: QD� �, � Samples req'd: Yes ❑ NoL� Mud log req'd: Yes E] No [!r [l 4L960 T'' t �O Z✓ � y zS measures: Yes [� No❑ Directional svy req'tl: Yes [�No❑ f}MnvGa+- r-tVtvrj7✓t 5 _ psi y�I P 1tn Ing excEplion req'd: Yes ❑ No[t]e Inclination -only svy req'd: Yes E] No r�✓ r4 Vat roq Yl -e � �0� �Jr. b7S�J Post initial injection MIT req'd: Yes❑ NoL7 l:5q'-anfi:-d Ya 4/lv�✓ /-tic ��`cko-F�Ipo,hf• to beoetny Point alvnJc J"` r,- patf'lnf" laftra/ APPROVED BY �-- I Approved by: COMMISSIONER THE COMMISSION Date:/013 rJ L rr'� /� Submit Form and (� if 71 \Fohrr-401 Revised 52017 This permit is valid f f a o approval per 20 AAC 25.005(g) achments in Duplicate ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 October 23, 2018 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the KRU 3H -13A (PTD# 196-197) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin on October 24, 2018. The objective will be to drill four laterals KRU 3H- 13AL1, 3H-13AL1-01, 3H-13AL1-02 and 3H-31AL1-03 targeting the Kuparuk A -sand interval. To account for geological uncertainties. ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 3H-13AL1, 31-1-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 - Detailed Summary of Operations - Directional Plans for 31-1-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 - Current wellbore schematic - Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-263-4321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 31-1-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 3H-13AL1-03 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary .......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2))..................................................................................................................................................2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 7. Diverter System Information..........................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(8)).........................................................................................-.......................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................5 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14)) ...... ................................................................................................................ .....................- - 6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))...................................................................................................................................................... 6 16. Attachments....................................................................................................................................6 Attachment 1: Directional Plans for 3H-13AL1, 3H-13AL1-01, 31-1-13AL1-02, & 3H-13AL1-03 laterals ..........................6 Attachment 2: Current Well Schematic for 3H-13A.........................................................................................................6 Attachment 3: Proposed Well Schematic for 3H-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 31-1-13AL1-03 laterals ............ 6 Page 1 of 6 October 23, 2018 PTD Application: 3H-13AL1, 31-1-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 1. Well Name and Classification (Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b)) The proposed laterals described in this document are 31-1-13AL1, 3H-13AL1-01, 31-1-13AL1-02, and 31-1-13AL1 03. The laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, and 3H-13AL1-03. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. - Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,800 psi. Using the maximum formation pressure in the area of 4,897 psi in 3H-22 (i.e. 15.5 ppg EMW), the maximum potential surface pressure in 3H -13A, assuming a gas gradient of 0.1 psi/ft, would be 4,299 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. - The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3H -13A was measured to be 2,567 psi (8.3 ppg EMW) on 9/16/2015. The maximum downhole pressure in the 3H -13A vicinity is the 31-1-22 at 4,897 psi (15.5 ppg EMW) measured on 6/17/2018. - Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) The offset injection wells to 3H -13A have injected gas, so there is a possibility of encountering free gas while drilling the 31-1-13A laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 3H -13A laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 3H -13A laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 3H-13AL1 7,750' 10,600' 5,932' 5,935' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 110' 1640 670 Surface aluminum billet on to 3H-13AL1-01 7,430' 10,600' 5,940' 5,900' 2-3/8", 4.7#, L-80, ST -L slotted liner; , 3520 2020 Production 7" aluminum billet on to 3H-13AL1-02 7,650' 10,000' 5,929' 5,984' 2-3/8", 4.7#, L-80, ST -L slotted liner; 4980 4320 Liner 3-1/2" 9.3 aluminum billet on to 3H-13AL1-03 7,330' 10,000' 5,910' 5,942' 2-3/8", 4.7#, L-80, ST -L slotted liner, 10540 Tubing 3-1/2" 9.3 J-55 with deployment on to Existing Casing/Liner Information Category OD Weight f Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi_psi Collapse Conductor 16" 62.5 H-40 Welded 0' 110' 0' 110' 1640 670 Surface 9-5/8" 36.0 J-55 BTC 0' 3072' 0' 2929' 3520 2020 Production 7" 26.0 J-55 BTC 0' 5970' 0' 5173' 4980 4320 Liner 3-1/2" 9.3 L-80 BTC -MOD 5808' 7755' 5049' 6203' 10160 10540 Tubing 3-1/2" 9.3 J-55 EUE 8rd 0' 5836' 0' 5071' 6980 7400 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based PowerVis mud (8.6 ppg) — Drilling operations: Chloride -based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and shale stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 3H -13A laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be Page 3 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 31-11-13 Window 7338' MD, 5985' TVD Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 314-13A is a Kuparuk A -sand producer equipped with 3-1/2" tubing and 3-1/2" production liner. The CTD sidetrack will utilize four laterals to target the A sand to the north and south of the 311-13A parent wellbore. The laterals will increase recovery and add additional resources. Pre -CTD Work 1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP. 2. RU Service Coil: Mill out "D" nipple and conduct fill cleanout. 3. Prep site for Nabors CDR3-AC rig. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 3H-13AL1 Lateral (A1 sand - south) a. Set top of whipstock at 7338' MD. Page 4 of 6 October 23, 2018 Pumps On 1.8 bpm) Pumps Off A -sand Formation Pressure 8.3 2567 psi 2567 psi Mud Hydrostatic 8.6 2677 psi 2677 psi Annular friction i.e. ECD, 0.08psi/ft) 587 psi 0 psi Mud + ECD Combined no chokepressure) 3264 psi Overbalanced -697psi) 2677 psi Overbalanced -110psi) Target BHP at Window 11.8 3672 psi 3672 psi Choke Pressure Required to Maintain Target BHP 408 psi 995 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 314-13A is a Kuparuk A -sand producer equipped with 3-1/2" tubing and 3-1/2" production liner. The CTD sidetrack will utilize four laterals to target the A sand to the north and south of the 311-13A parent wellbore. The laterals will increase recovery and add additional resources. Pre -CTD Work 1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP. 2. RU Service Coil: Mill out "D" nipple and conduct fill cleanout. 3. Prep site for Nabors CDR3-AC rig. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test. 3H-13AL1 Lateral (A1 sand - south) a. Set top of whipstock at 7338' MD. Page 4 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 b. Mill 2.80" window at 7338' MD. c. Drill 3" bi-center lateral to TD of 10600' MD. d. Run 2-3/8" slotted liner with aluminum billet from TD up to 7750' MD. 3. 3 H-13AL I -01 Lateral (A2/A3 sand- south) a. Kickoff of the aluminum billet at 7750' MD. b. Drill 3" bi-center lateral to TD of 10600' MD. c. Run 2-3/8" slotted liner with aluminum billet from TD up to 7430' MD. 4. 3H-13AL1-02 Lateral (A] sand - north) a. Kickoff of the aluminum billet at 7430' MD. b. Drill 3" bi-center lateral to TD of 10000' MD. c. Run 2-3/8" slotted liner with aluminum billet from TD up to 7650' MD. 5. 3H-13AL1-03 Lateral (A2/A3 sand- north) a. Kickoff of the aluminum billet at 7650' MD. b. Drill 3" bi-center lateral to TD of 10000' MD. c. Run 2-3/8" slotted liner with deployment sleeve from TD up to 7330' MD. 6. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Obtain SBHP. 2. Change out gas lift design. 3. Return well to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. — Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. — When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. — The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA un -deployment, the steps listed above are observed, only in reverse. Liner Running — The 3H -13A laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. — While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a Page 5 of 6 October 23, 2018 PTD Application: 3H-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 3H-13AL1-03 deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name I Distance 3H-13AL1 4760' 3H-13AL7-01 4820' 3H-13AL7-02 6630' 3H-13AL1-03 6850' - Distance to Nearest Well within Pool Lateral Name Distance Well 3H-13AL1 703' 31-1-12A 31-1-13AL1-01 703' 3H -12A 3H-13AL7-02 155' 31-1-13A 3H-13AL1-03 155' 31-1-13A 16. Attachments Attachment 1: Directional Plans for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03laterals Attachment 2: Current Well Schematic for 3H -13A Attachment 3: Proposed Well Schematicfor3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 laterals Page 6 of 6 October 23, 2018 Project: Kuparuk River Unit WELLBORE DETAILS. 3H-13AL1 REFERENCE IWrOHIMTION Nom 6ea Coa/orale lN@f Tkre Wd 314-13,Tw NwN pp Site: Kuparuk SH Pad I,lae^e Fla Parent Wellbore. 314-13A Verbot IWDI Rek '3X13®16.000(3H-13) T,e,^asr�rp� _- Well 31443 II m53a x.3 Tiep0 MD 7300.00 S Iol M)Het 6p1 -106Y, Ol WI'IW Wallace: 314-13AL1 ^"a '=- oa., ill a Measlad OepN He. . 31413@760Na1(3H-13) aGE..pam ConocoPhillips Plan: 5H43AL1 p00 (314-1313X-13AL11 Mal 9GGMA18 Ctl Im. Walla! M Imam Curvature )II �//311-E J.I.IC 314E4/III24 :II -22/31k ... ... IJ/311-J21.HrJYHI 11,01,11. - ;nanii4.l. urlvoa 8550 yl Il�lln. 81001 601 7650- 72001 650-]200 cu nn _ 6750 _ II li jolln_1_ VI ,� ' II 311-.n1 I: 41`81 rAl 311 . "141nA / 3011{H 6300 tll/311-I3RLI+I - II 1 11.19 644 1 IL/JI`lil 5850 lit -"III -'-xM1 54DO 3IF` -II /��I lltll-^-J I,lAl�l til — R al r II'Lf FI) r?i.. .5 n nn eoH, n l . 1 4950, - �yr nl.glrll iJl Irlil p 4500 - 3�i3L311�IJIlu�PBl 3& 9l 11 ^II L -0I 11, 311,1411 4050 u0 IF Rltll R ! ;SII- 14111 1JI I+1R "rll.`RA19fl rkr III r�I1.IJ111 I1 + 3600 - II II -1^ '^ 3I i Il li`. 4 , -1J/rll-14111.1 L 115 11 IDPI aVp�/11-111.1 111 1 rl Ll^ Y O rISD� - III FIL II_ 111!,314 1A 6p d 'II -I II\1'111 311 II 1. V' II -I nVHI tll 11n1I 39 >}1111 I,311 I ;II -2111 II/JI-IIAIS t I ']OD�o _ 3 t_... -Ix 111p 6h4 53; lata a gg 2 O 2250 311tH tll I vi 1800 tli3i/311 R[ I - - _ a-3 _III I;II IrL - l d" 911 I A al F `fl / hy'` II n II, ISAII Csrlul 1- 31f nl' 1350 aH-2snu swlfxl e�OM1 , 111-1111-1 l¢1l 1 n Al,I1�1 900 { I n-lino-IIn i{ nl.ltr9111 1 I rt� " 13b1: 450 31uiN;jl+ nO� 311-IM1vll-Ir.-.11-1u SII-Init L;3/tI l -i; 9 r fk w u u b 311-I 1-11 ^IH 111 11-0 - III rqP-IDc I lill4nEt 1412 ill.,tYl11-IOCI.I I 9001 1 ID-vll l-InAPlll st,,.r c ,$ 3wrsH 4rv1' 131;1111 ,3J Irm -1350 'u-il.<;1 LInn nnMr i)II-3381 b31\LI 800 fI _.50 2)00 ]ISO 1000 40^0 �Y.�00 4950 5400 5850 6300 6750 72 -7650 -7200 fi75D -6300 -5850 -5400 4950 4500 4050 -3600 -3150 -1700 -2250 -1800 -1350 4gg0 316'6/311 .pA A50 pp90,�0 1350 1800 ^' � 00 31WII West(-)jRv8 +) (145.0 l/i31)al3{NOH{1a 311,,WM 4 1114:01 31;11/3X11 `: •:91LmH-01 3HAX1HL3 314-13 ®]B.00usfl (314-13) 3Hal51w05 ConocoPhillips _ConocoPhillips Export Company Kuparuk River Unit Kuparuk 3H Pad 3H-13 3H-13AL1-01 Plan: 3H-13AL1-01_wp01 Standard Planning Report 22 October, 2018 BA SER 9 UGHES a GE company ConocoPhillips Database: EDT 14 Alaska Production Company: _ConocoPhillips Export Company Project: Kupawk River Unit Site: Kupawk 3H Pad Well: 3H-13 Wellbore: 3H-13ALI-01 Design: 3H-13AL1-01_wp01 ConocoPhillips Northing: Planning Report Easting: Local Coordinate Reference: Well 3H-13 TVD Reference: Mean Sea Level MD Reference: 3H-13 @ 76.00usft (3H-13) North Reference: True • Survey Calculation Method: Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) - System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor UGHES a GEcampany Site Kuparuk 3H Pad Northing: 0.00 usft Easting: 0.00 usft Site Position: Northing: 6,000, 110.73 usft Latitude: 70'24'41.531N From: Map Easting: 498,655.44 usft Longitude: 150' 0'39.416 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: -0.01 ° Well 3H-13 Well Position -NIS •E/ -W Position Uncertainty Wellbore Magnetics Design And it Notes: Version: Vertical Section: 0.00 usft Northing: 0.00 usft Easting: 0.00 usft Wellhead Elevation: 3H-13ALl-01 Model Name BGGM2018 3H-13AL1-01_wp01 Sample Date 11/112018 6,000,475.46 usft - Latitude: 498,655.42 usft Longitude: usft Ground Level: Declination (`) Dip Angle 1°) 80 91 Phase: PLAN Tie On Depth: Depth From (TVD) +NIS *EAW (usft) (usft) (usft) 0.00 0.00 0.00 70° 24'45.119 N 150° 0'39.419 W 0.00 usft Field Strength (nT) 57 435 7,750.00 Direction (°) 18000 101222018 6:20.09PM Page 2 COMPASS 5000.14 Build 85D �, ConocoPhillips BITER Co11000Philfips Planning Report F UGHES aGErompany Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well 3H-13 Company: _ConocoPhillips Export Company TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 3H-13 @ 76.00usft (31-1-13) Site: Kuparuk 3H Pad North Reference: True Well: 3H-13 Survey Calculation Method: Minimum Curvature Wellbore: 3H-13AL1-01 Build Turn Design: 3H-13AL1-01_wp01 Depth Inclination 10222018 6.2O.09PM Page 3 COMPASS 5000.14 Build 850 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System -NIS +E/ -W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) (°) Target 7,750.00 91.51 163.96 5,931.99 2,974.20 -521.88 0.00 0.00 0.00 0.00 7,850.00 98.51 163.96 5,923.26 2,878.52 -494.37 7.00 7.00 0.00 0.00 8,025.00 90.56 173.31 5,909.40 2,707.80 -460.13 7.00 -4.54 5.35 130.00 8,325.00 94.09 194.03 5,897.10 2,410.34 479.15 7.00 1.18 6.91 80.00 8,425.00 94.67 201.03 5,889.45 2,315.32 -509.17 7.00 0.58 7.00 85.00 8,550.00 90.27 208.60 5,884.06 2,202.09 -561.54 7.00 -3.52 6.06 120.00 8,950.00 88.36 180.66 5,888.96 1,818.93 -661.59 7.00 -0.48 -6.98 -94.00 9,050.00 83.01 185.19 5,896.49 1,719.41 -666.66 7.00 -5.35 4.53 140.00 9,150.00 83.06 192.24 5,908.64 1,621.35 -681.69 7.00 0.05 7.05 90.00 9,250.00 86.59 198.31 5,917.66 1,525.34 -707.92 7.00 3.53 6.07 60.00 9,450.00 89.81 211.94 5,923.98 1,344.82 -792.61 7.00 1.61 6.82 77.00 9,775.00 89.82 189.19 5,925.04 1,042.53 -906.05 7.00 0.00 -7.00 -90.00 9,875.00 95.18 184.68 5,920.68 943.42 -918.12 7.00 5.36 4.51 -40.00 9,975.00 95.14 177.65 5,911.67 843.91 -920.15 7.00 -0.04 -7.03 -90.00 10,075.00 90.63 183.01 5,906.64 744.10 -920.73 7.00 4.52 5.36 130.00 10,350.00 90.59 202.26 5,903.70 477.04 -980.61 7.00 -0.01 7.00 90.00 10,550.00 91.06 188.27 5,900.81 284.60 -1,033.13 7.00 0.23 -7.00 -88.00 10,600.00 91.05 191.77 5,899.88 235.38 -1,041.83 7.00 0.00 7.00 90.00 10222018 6.2O.09PM Page 3 COMPASS 5000.14 Build 850 ConocoPhillips BA ER ConocoPhillips Planning Report F�UGHES aGEcompeny Database: EDT 14 Alaska Production Local Co-ordinate Reference: Wel13H-13 Company: _ConocoPhillips Export Company TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 31-1-13 @ 76.00usft (31-1-13) Site: Kuparuk 3H Pad North Reference: True Well: 31-1-13 Survey Calculation Method: Minimum Curvature Wellbore: 311-13AL1-01 Design: 3H-13AL1-01_wp01 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/ -S +E/-yy Section Rate Azimuth Northing Easting (usft) (•) (°) (usft) (usft) (usft) (usft) (°1100usft) (°) (usft) (usft) 7,750.00 91.51 163.96 5,931.99 2,97420 -521.88 -2,974.20 0.00 000 6,003,44945 498,134.13 TIP/KOP 7,800.00 95.01 163.96 5,929.14 2,926.23 -508.09 -2,926.23 7.00 0.00 6,003,401.49 498,147.91 7,850.00 98.51 163.96 5,923.26 2,878.52 494.37 -2,878.52 7.00 0.00 6,003,353.78 498,161.62 Start of 7 dis 7,900.00 96.25 166.65 5,916.83 2,830.56 481.79 -2,830.56 7.00 130.00 6,003,305.83 498,174.18 8,000.00 91.70 171.99 5,909.89 2,732.59 463.33 -2,732.59 7.00 130.35 6,003,207.86 498,192.63 8,025.00 90.56 173.31 5,909.40 2,707.80 460.13 -2,707.80 7.00 130.72 6,003,183.07 498,195.82 3 8,100.00 91.47 178.48 5,908.07 2,633.03 -454.77 -2,633.03 7.00 80.00 6,003,108.31 498,201.17 8,200.00 92.66 185.39 5,904.47 2,533.22 -458.14 -2,533.22 7.00 80.09 6,003,008.50 498,197.79 8,300.00 93.81 192.30 5,898.82 2,434.62 -473.47 -2,434.62 7.00 80.34 6,002,909.92 498,182.43 8,325.00 94.09 194.03 5,897.10 2,410.34 -479.15 -2,410.34 7.00 80.73 6,002,885.64 498,176.75 4 8,400.00 94.53 199.28 5,891.46 2,338.71 -500.58 -2,336.71 7.00 85.00 6,002,814.03 498,155.31 8,425.00 94.67 201.03 5,889.45 2,315.32 -509.17 -2,315.32 7.00 85.39 6,002,790.64 498,146.72 5 8,500.00 92.03 205.58 5,885.07 2,246.58 -538.78 -2,246.58 7.00 120.00 6,002,721.92 498,117.10 8,550.00 90.27 208.60 5,884.06 2,202.09 -561.54 -2,202.09 7.00 120.27 6,002,677.43 498,094.33 6 8,600.00 90.02 205.11 5,883.94 2,157.48 -584.12 -2,157.48 7.00 -94.00 6,002,632.83 498,071.74 8,700.00 89.53 198.13 5,884.33 2,064.58 -620.94 -2,064.58 7.00 -94.01 6,002,539.94 498,034.91 8,800.00 89.05 191.14 5,885.56 1,967.89 -646.19 -1,967.89 7.00 -93.98 6,002,443.27 498,009.65 8,900.00 88.58 184.16 5,887.63 1,868.86 -659.49 -1,868.86 7.00 -93.90 6,002,344.25 497,996.34 8,950.00 88.36 180.66 5,888.96 1,818.93 -661.59 -1,818.93 7.00 -93.75 6,002,294.33 497,994.23 7 9,000.00 85.68 182.92 5,891.56 1,769.03 -663.15 -1,769.03 7.00 140.00 6,002,244.43 497,992.66 9,050.00 83.01 185.19 5,896.49 1,719.41 -666.66 -1,719.41 7.00 139.88 6,002,194.81 497,989.14 8 9,100.00 83.02 188.71 5,902.57 1,670.15 -672.66 -1,670.15 7.00 90.00 6,002,145.56 497,983.12 9,150.00 83.06 192.24 5,908.64 1,621.35 -681.69 -1,621.35 7.00 89.57 6,002,096.77 497,974.09 9 9,200.00 84.82 195.28 5,913.92 1,573.07 -693.52 -1,573.07 7.00 60.00 6,002,048.50 497,962.26 9,250.00 86.59 198.31 5,917.66 1,525.34 -707.92 -1,525.34 7.00 59.68 6,002,000.78 497,947.84 10 9,300.00 87.38 201.72 5,920.29 1,478.44 -725.01 -1,476.44 7.00 77.00 6,001,953.88 497,930.75 9,400.00 89.00 208.54 5,923.45 1,388.01 -767.44 -1,388.01 7.00 76.82 6,001,863.47 497,888.31 9,450.00 89.81 211.94 5,923.98 1,344.82 -792.61 -1,344.82 7.00 76.60 6,001,820.29 497,863.13 11 9,500.00 89.81 208.44 5,924.14 1,301.61 -817.76 -1,301.61 7.00 -90.00 6,001,777.09 497,837.98 9,600.00 89.81 201.44 5,924.48 1,210.99 -859.90 -1,210.99 7.00 -89.99 6,001,686.49 497,795.82 9,700.00 89.82 194.44 5,924.80 1,115.92 -890.69 -1,115.92 7.00 -89.96 6,001,591.43 497,765.02 9,775.00 89.82 189.19 5,925.04 1,042.53 -906.05 -1,042.53 7.00 -89.94 6,001,518.05 497,749.65 12 9,800.00 91.16 188.07 5,924.83 1,017.82 -909.80 -1,017.82 7.00 40.00 6,001,493.34 497,745.89 9,875.00 95.18 184.68 5,920.68 943.42 -918.12 -943.42 7.00 40.01 6,001,418.95 497,737.56 13 9,900.00 95.18 182.93 5,918.42 918.58 -919.77 -918.58 7.00 -90.00 6,001,394.12 497,735.91 9,975.00 95.14 177.65 5,911.67 843.91 -920.15 -843.91 7.00 -90.16 6,001,319.45 497,735.52 14 10,000.00 94.01 179.00 5,909.68 819.01 -919.42 -819.01 7.00 130.00 6,001,294.55 497,736.24 In n7s nn 9n 63 183.01 5.906.64 744.10 -920.73 -744.10 7.00 130.11 6=1,219.68 497734.91 1022!2018 6.20:09PM Page 4 COMPASS 5000.14 Build 85D ConocoPhillipsER ConocoPhillips Planning Report BJUGHES aGEcompany Database: EDT 14 Alaska Production Company: _ConocoPhillips Export Company Project: Kupamk River Unit Site: Kupamk 3H Pad Well: 31-1-13 Wellbore: 3H-13AL1-01 Design: 3H-13AL1-01_wp01 Planned Survey Measuretl TVD Below y5 Depth Inclination Azimuth System ✓ +N/ -S (usft) (°) (°) (usft) (usft) 15 -922.43 -719.16 7.00 10,100.00 90.63 184.76 5,906.37 10,200.00 90.62 191.76 5,905.28 10,300.00 90.60 198.76 5,904.22 10,350.00 90.59 202.26 5,903.70 16 2,974.20 6,000,999.44 497,692.52 10,400.00 90.71 198.76 5,903.13 10,500.00 90.94 191.77 5,901.68 10,550.00 91.06 188.27 5,900.81 17 -479.15 6,000,905.82 497,657.47 10,600.00 91.05 191.77 5,899.88 Planned TO at 10600.00 6,000,809.43 497,631.15 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3H-13 Mean Sea Level 31-1-13 @ 76.00usft (31-1-13) True Minimum Curvature Vertical Dogleg -EI-W Section Rate (usft) (usft) (°/100usft) Toolface Map Map Azimuth Northing Easting (1 (usft) (usft) 719.16 -922.43 -719.16 7.00 90.00 Measured 6,001,194.72 497,733.21 620.27 -936.79 -620.27 7.00 90.02 6,001,095.84 497,718.84 523.86 -963.09 -523.86 7.00 90.10 2,974.20 6,000,999.44 497,692.52 477.04 -980.61 -477.04 7.00 90.17 8,025.00 6,000,952.63 497,675.00 430.22 -998.13 -430.22 7.00 -88.00 -479.15 6,000,905.82 497,657.47 333.82 -1,024.44 -333.82 7.00 -88.04 5,884.06 6,000,809.43 497,631.15 284.60 -1,033.13 -284.60 7.00 -88.14 7 6,000,760.22 497,622.44 235.38 -1,041.83 -235.38 7.00 90.00 6,000,711.00 497,613.74 10,600.00 5,899.88 2 3/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +NIS +E/ -W (usft) (usft) (usft) (usft) Comment 775000 5,931.99 2,974.20 -521.88 TIPIKOP 7,850.00 5,923.26 2,878.52 -494.37 Start of 7 cls 8,025.00 5,909.40 2,707.80 -460.13 3 8,325.00 5,897.10 2,410.34 -479.15 4 8,425.00 5,889.45 2,315.32 -509.17 5 8,550.00 5,884.06 2,202.09 -561.54 6 8,950.00 5,888.96 1,818.93 -661.59 7 9,050.00 5,896.49 1,719.41 -666.66 8 9,150.00 5,908.64 1,621.35 -681.69 9 9,250.00 5,917.66 1,525.34 -707.92 10 9,450.00 5,923.98 1,344.82 -792.61 11 9,775.00 5,925.04 1,042.53 -906.05 12 9,875.00 5,920.68 943.42 -918.12 13 9,975.00 5,911.67 843.91 -920.15 14 10,075.00 5,906.64 744.10 -920.73 15 10,350.00 5,903.70 477.04 -980.61 16 10,550.00 5,900.81 284.60 -1,033.13 17 10,600.00 5,899.88 235.38 -1,041.83 Planned TD at 10600.00 10222018 6:20.'09PM Page 6 COMPASS 5000.14 Build 85D ✓ ConocoPhillipsBAKER ConocoPhillips Travelling Cylinder Report HUGHES aGEcompany Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kuparuk River Unit Reference Site: Kupamk 3H Pad Site Error: 0.00 usft Reference Well: 3H-13 Well Error: 0.00 usft Reference Wellbore 3H-13AL7-01 Reference Design: 3H-13AL1-01_wp01 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3H-13 311-13 @ 76.00usft (3H-13) 31-1-13 @ 76.00usft (31-1-13) True Minimum Curvature 1.00 sigma EDT 14 Alaska Production Offset Datum Reference 3H-13A1_7-01_wp01 Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria From Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 7,750.00 to 10,600.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum center -center distance of 1,252.40 usft Error Surface: Pedal Curve Survey Tool Program Date 10/22/2018 From TO Reference Offset (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 5,905.00 3H-13 (3H-13) GCT -MS Schlumberger GCT mul ishot 6,118.56 7,300.00 31-1-13AATDB(31-1-13A) MWD MWD - Standard Depth 7,300.00 7,750.00 3H-13A1_1_wp04(311-13AL1) MWD MWD -Standard Offset Well - Wellbore - Design 7,750.00 10,600.003H-13AL7-01_wp01(31-1-13AL1-01) MWD MWD - Standard (usft) Casing Points Kuparuk 3H Pad _ Measured vertical Casing Hole Depth Depth Diameter Diameter Out of range (usft) (usft) Name (in) (in) 10,600.00 5,975.88 2 3/8' Out of range 2.375 3.000 Summary Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Site Name Depth Depth Distance (usft) from Plan Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Kuparuk 3H Pad 3H-10 - 3H-10 - 3H-10 Out of range 3H-10 - 3H -10B - 3H-108 Out of range 3H-10 - 3H -10C - 3H -10C Out of range 31-1-10 - 3H-10CL7 - 31-1-10CL1 Out of range 3H-10 - 3H-10CL2 - 3H-10CL2 Out of range 3H-10 - 3H-10CL2-01 - 3H-10CL2-01 Out of range 3H-10 - 3H-10CL2-02 - 3H-10CL2-02 Out of range 3H-10 - 3H-10CPB1 - 3H-10CPB1 Out of range 3H-11 - 3H-11 - 31-1-11 Out of range 3H-11 - 3H -11A - 3H -11A Out of range 3H-11 - 3H-11 AL1 - 3H-11 AL1 Out of range 3H-11 - 3H-11 AL1 -01 - 3H-11AL1-01 Out of range 3H-12 - 3H-12 - 311-12 Out of range 3H -12 -3H -12A -3H -12A 9,250.00 8,950.00 691.33 221.50 470.92 Pass - Major Risk 31-1-12 - 3H-12AL7 - 3H-12AL1 8,282.71 7,710.00 901.45 209.65 692.71 Pass- Major Risk 31-1-12-3H-12AL2-3H-12AL2 8,375.00 7,950.00 733.26 211.20 523.90 Pass -Major Risk 3H-12 - 311-12AL3 - 3H-12AL3 8,290.60 7,925.00 707.37 210.34 498.34 Pass- Major Risk 3H-12 - 3H-12APB1 - 31-1-12APBl Out of range 3H -13 -3H -13-3H-13 8,700.00 6,400.00 857.27 40.99 817.61 Pass - Major Risk 3H -13 -3H -13A -3H -13A 7,757.93 7,100.00 427.10 8.67 419.02 Pass - Major Risk 3H-13-3H-13AL7-3H-13AL1_wp04 9,425.88 9,400.00 15.94 0.32 15.67 Pass - Minor 1/10 3H-13-3H-13ALI-02-3H-13ALi-02_wp02 7,761.59 7,100.00 430.89 5.82 425.38 Pass - Major Risk 3H-13-3H-13AL1-03-3H-13AL7-03_wp03 7,761.59 7,100.00 430.89 5.82 425.38 Pass - Major Risk 3H-14 - 3H-14 - 3H-14 Out of range 31-1-14 - 3H -14A - 3H -14A Out of range 31-1-14-3H-14APB7-3H-14APB1 Out of range 3H -14 -3H -14B -3H -14B Out of range CC - Min centre to center distance or covergent point, SF- min separation factor, ES - min ellipse separation 1027/2018 3:12:57PM Page 2 COMPASS 5000.14 Build 85D ConocoPhillips Project: Kuparok RWerd SNB: k3N Pad =.,=r. nmmm rMa WELLBORE DETAILS: 3H-13AL1-01 REFERENCE INFMMAVON Parent Wallb": 3H- 3AL1 C nm INIEI Reh nm: Wel3n13jm Nm6 Wall: SH -13 3H.13 sewW naSm Tie. MD: 7750.00 Veram ReMara: Nmn smw.D Wellbore: 3H-13AL1-01 Op,iyla: mer Northing V$) 6.ae1 section Ns) Reiweme, Plan: 3N-13AL1-01_w01(3H-1313X.BALI-01) noa.1�00cAuo� Longitude 3M 3 @76. WNInNI]) Ahewe0WwW Wxm. 3X130 0.00 6000475.46 ceMee6n Nemm. w mem CuneMa C g Mean f 6500 6000 5500 5000 ossoo 0 v 0a0 02500 �zooc r 31500 N 1000 Kin BAT HESS WELL DETAILS: 3H-13 +N/ -S +E/ -W Northing Easting 0 Latitude Longitude 0.00 0.00 6000475.46 498655.42 70° 24'45.119 N 150` 0'39.419 W Sec MD Inc Azi TVDSS +N/ -S +E1 -W Dleg TFace VSect Annotation 1 7750.00 91.51 163.96 5931.99 2974.20 -521.88 0.00 0.00 -2974.20 TIPIKOP 2 7850.00 98.51 163.96 5923.26 2878.52 -494.37 7.00 0.00 -2878.52 Start of 7 dis 3 8025.00 90.56 173.31 5909.40 2707.80 460.13 7.00 130.00 -2707.80 3 4 8325.00 94.09 194.03 5897.10 2410.34 -479.15 7.00 80.00 -2410.34 4 5 8425.00 94.67 201.03 5889.45 2315.32 509.17 7.00 85.00 -2315.32 5 6 8550.00 90.27 208.60 6884.06 2202.09 -561.54 7.00 120.00 -2202.09 6 7 8950.00 88.36 180.66 5888.96 1816.93 561.59 7.00 -94.00 -1818.93 7 8 9050.00 83.01 185.19 5896.49 1719.41 -666.66 7.00 140.00 -1719.41 8 9 9150.00 83.06 192.24 5908.64 1621.35 .681.69 7.00 90.00 -1621.35 9 10 9250.00 86.59 198.31 5917.66 1525.34 -707.92 7.00 60.00 -1525.34 10 11 9450.00 89.81 211.94 5923.98 1344.82 -792.61 7.00 77.00 -1344.82 11 12 9775.00 89.82 189.19 5925.04 1042.53 -906.05 7.00 -90.00 -1042.53 12 13 9875.00 95.18 184.68 5920.68 943.42 -918.12 7.00 -40.00 -943.42 13 14 9975.00 95.14 177.65 5911.67 843.91 -920.15 7.00 -90.00 -843.91 14 15 10075.00 90.63 183.01 5906.64 744.10 -920.73 7.00 130.00 -744.10 15 16 10350.00 90.59 202.26 5903.70 477.04 -980.61 7.00 90.00 477.04 16 17 10550.00 91.06 188.27 5900.81 284.60 -1033.13 7.00 -88.00 -284.60 17 18 10600.00 91.05 191.77 5899.88 235.38 -1041.83 7.00 90.00 -235.38 Planned TD at 10600.00 g Mean f 6500 6000 5500 5000 ossoo 0 v 0a0 02500 �zooc r 31500 N 1000 Kin BAT HESS 'NONE .500 0 0 0 8 8 I■■■■■■■■■IFf ■■■■ ■■1 I■■■■■■■■■►ii 1■■■■■■■■��rrr�■■■■■■■■I �■FJIU■■ ■■■ ■■■I ■■■■® ■■■■■1 I■■■■■■■t°��:. ■■■■■■ II■■■■■■ZU' 1l■�■■■■■ 1■■■■■ZIN � �■�i�' ■■■■I II■■■■®■��!�!!■■■■■■■■I �I■■■■®��1■■■■■■■■1 'NONE .500 0 0 0 8 8 West( -)Bast(+) (500 usftlin) 0 Vertical Section at 180.00° (95 usft/in) KUP PROD 3H -13A ConOCoPhillips MMMLA Weil .!tributes Max Angle &MD 7D A.ska Inc. I.,IWre08I901 Fi51AF FR`O'Da SlMuz 501032000901 KUPARUK RIVER UNIT PROD ncl59 MOIIINBI ACI BIm IflKBI 5934 6,9)4.11 ],]55.0 AnnoVt'pn Fntl Ga@ Leat 0#p: 1/6)199] KB.Grd up 119 RNux 9rte 3]01 1/9/1988 Comment 1125(ppro I gale SSSV: NIPPLE 250 4/2/2015 3Nt3A, wl&2m54.te ee vM Vinausplairratic atlas pnnolrtion OepIM1 INKaI End Oele AnnaWbn Leal Moc By EM Oeh Last Tag'. SLM ]8240 9/1612015 Rev Reason: GLV CIO, TAG, H2S yproven 9/29/2015 'amng-S rings Casing CescdpLon oo(ml to TOPInKBI WNinth INKBI Sat Weld 1T9O1... Widen(L. Case Top Thread CONDUCTOR 16 15.062 360 1100 1100 62.501440 WELDED Cxing Descrlpion OD (in) to lin) TophtKid SadNP11CKBI Set DepIM1 NVUT WbLen 1- Grade TOP nuad SURFACE 9518 8.921 350 3,Ofl8 2,929A 3600155 BTC Casing Onsionotlan OO(in) IDllnl Top IXKB) SN Noth (flKBI Set NO INBL.. WxLan p... Grade TOP Ilies PRODUCTION Post 7 6.276 330 5,8]00 5,1725 26.00155 BTC SIT Casing Neniplion Oo lint Mile) Top(XKB) Bel OepIM1 IXK9) aN OepIn FIND).. WnLen g... GMe Tap TIsead LINER 312 2.992 5.808.4 ],]55.0 930 L-80 BTC -MOD ;..UCTop; Liner Details to mvINK01 mpIrv0l lnKgl Top 140 nem Dee In gni 5,808.9 5,049.] 40.50 KI SComLE BAKERLINER TIEBACK SLEEVE wIBAKER G2 5.250 a66v00 PACKER PACKS ACKE ZXP LINER TOP PACKER 5,8223 50803 4048 HANGER BAKER HMC LINER HANGER 4.375 NIPPLE:EOfS 5829.1 50654 40.475BE I BAKER SEAL BORE EXTENSION 4.000 Tubing Strings Tebing Cescriplion Slriy Ma... 1011n) Top IXKBI $eloepiM1 lX.. Sft CepIM1 IND))... 0#1116),21 Grade Top ConnMbn Cas LIFT: 2.Tmt TUBING 3112 2.992 270 5636.9 5,0]10 9.30155 EUE so Completion Details Nominal lO Top (MB) Top(MINXKBI Toplzl(°I 1.Oaa Cam Ilnt 270 27.0 0.16 HANGER McEvoy 31/2" 5000# GEN III Tubing hanger wl 155 Pup 2.992 BUB BN lop SOIS 501.4 0.85 NIPPLE 31IT Camw DS' Nipple 45O'OD, 2ALr' ID 2.812 SURFACE 3?O31ma- 5,502.9 5.045.5 4051 NIPPLE 311T CAMCO'P Nipple wl 2.]50 -No -GO Profile 2.750 5,809.9 5.0509 4050 LOCATOR BAKER LOCATOR 3.000 3S LIFT; s.0 Ia 5,812.0 5.052.4 40.50 SEALASSY BAKER GBH SEAL ASSEMLY sold' STROKE B 3.000 SPECIAL LOCATOR TO STAB INTO LINER ME -BACK SLEEVEIPACKER GAS LIFT; 5.0n1 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) TeplNO) mpl 1 Top INKin InKid FI ces CO. Run Gate mgni 59460 5,1559 4106 WINDOW SIDETRACK CASING WINDOW 1/6/199] 6.000 Perforations & Slots 6M1o1 GPSLIFT:S]ST2 M Tonum BM OVDI IsM1OWI TOprftKTQ7,229 Btm IflKBI g5,9 Ifll(B) lana Bata n Type Coon ],229.0 7,2490 5,92)2 5,93].9 C-0,UNIT B, 5/912002 4.0 RPERF O PJ OF Chgs, 3K13A 60,1TSO, 80 Oag ph NIPPED s.em.e 7.2580 7,308.0 5,942.] 5,9692 A-3. A-2, 3H- 1/2111997 4.0 (PERF 100 deg. phasing; 21,2' 13A HSDCarrier 7,356.0 73660 5.9044 5,9996 A-1, 3W13A OY2N2009 6.0 APERF 2" HMX Milleniom, 6O deg pH ].3]20 7,3800 8,0021 6,006.9 A-1, 31143A 8,25,2009 60 APERF 2"HMX Millenium, SO LOCATOR. S.a�.9 deg pH Mandrel Inserts at sou Assr:6e¢G all N Tap 1X1181 TOP (rvO) label Make Mode Galin) Ses' Valro Type Lakh Type Pon slza (in) TRO Run (psi) Ron Dale Cam 1 2,720.1 2,651.1 Camw KBUG 1 GASLIFr GLV BK 0.156 1319.0 9/252015 000 81132 015 2 1 3,744.0 Camw KBUG 1 GASLIFT GLV BK 0.156 1,280.0 91252015 9:30 911312 015 3 5,0]].1 4,4879 Damon KBUG 1 GASLIFT GLV BK 0.108 1.303.0 91252015 9:00 wwpdw: 5.9aeo 91im 0155 PRooucrlox POrt ert; 4 5,]5]2 5,0108 Camw MMM 1112 GAS LIFT OV RK 0.188 0.0 9292015 2:30 330.5.970.0 911312 1115 Notes: General & Safety Em Wale AnnoWlion 11fi/t99] NOTE. WELL SIDETRACKED -ORIGINAL COMPLETION DATE I/4/1988 CPSR072aIll-72,00-1202006 NOTE:WAIVEREDWELL IAROACOMMUNICATION &162009 NOTE: TIGHT SPOT M-]268'-]313' 1129/2010 NOTE: Yew Schematics/Alaska Schematic9.O (PERF;>259.07.3R90- ,PFA1:7]06.0.]3a6A- PPERF,75720.],380O- LINER:OACIT ]7550 31-1-13A Proposed CTD Schematic 16", 62.5#, H40 shoe at 110' MD' ',36#J55 at 3072' MD 7", 260, J-55 sidetracked at 5970' MD (1997) C -sand perfs 7229-7249' MD sand parts 7258'-7308' MD 7356'-7366' MD 7372'-7380' MD r1/2", 9.3#, 1. 0 liner 08'-7755' MD 3-1/2" Camco DS -nipple at 502' MD (2.813" min ID) 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Camco KBUG gas lift mandrels 2720', 4118', 8 5077' MD 3-1/2" Camco MMM gas lift mandrel 5757' MD 3-1/2" Camco D -nipple at 5803' MD (2.750" min ID) Baker 3-1/2" GBH -22 seal assembly at 5812' MD (3" ID) Liner too Baker 5" x 7" ZXP liner top packer at 5806' MD Baker 5" x 7" HMC liner hanger at 5822' MD Baker SBE (12' length with 4" ID seal bore) Landing collar at 7654' MD Tight spot in 3-1/2" liner 7268'-7313' MD KOP at7338' MD Baker 3-1/2" XL Monobore whipstock 3H-13AL1-03 wp03 TD @ 10,000' MD Liner top at 7330' MD 3H-13AL1-02 wp02 TD @ 10,000' MD Liner 8dlet et 7650' MD 10,600' MD lillet (077430' MD 3H-13AL1 wp04 TD @ 10,600 MD Liner Billet @ 7,750' MD TRANSMITTAL LETTER CHECKLIST WELL NAME: K R, U. 3H -(3A L l- O G PTD: � 15 -113-6 t, evelopment _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: K U p ✓ z K i' Ii2 1/ POOL: K u pa,y a k 0; Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit / LATERAL No. 196 — 19 API No. 50- 10_-3-_246R-4 --DA-_00.V/ (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - _-_) from records, data and logs acquired for well name on ermit . The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company—Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Comoanv Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of J well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, v/ composite curves for well logs run must be submitted to the AOGCC composite within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field 8 Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 PTD#:2181360 Company CONOCOPHILLIPSMI-A515A INC Initial Class/Type Well Name: KUPARUK RIV UNLT 3H-13AL1-01 Program DEV Well bore seg DEV/PEND GeoArea $90 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas. conforms to AS31,05.030(j. 1.A),6,2.A-D) _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ NA 1 Permit fee attached ... . . . . ....... . . .. .... . . . . . . ..... . . NA ... - -- 2 Lease number appropriate ..... . . . . . . . ...... . . . . . ... . . . . . Yes ...... ................... 3 Unique well name and number ... . . . . . ...... . . ....... . . Yes 4 .Well located in a defined pool .......... ....................... .. ... Yes.. _.....--. 5 Well located proper distance from drilling unit. boundary_ .. _ _ .. Yes 6 Well located proper distance from other wells _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ .... 7 Sufficient acreage. available in drilling unit _ _ _ _ _ _ Yes 8 If deviated, is wellbore plat. included _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No. ... _ Directmonal plan view included, 9 Operator only affected party.. _ Yes 10 Operator has. appropriate bond in force _ _ _ _ _ _ _ .. _ _ Yes Appr Date 11 Permit can be issued without conservation order _ _ .. _ Yes DLB 10/24/2018 12 Permit can be issued without administrative approval _ _ _ _ _ _ Yes _ _ .... 13 Can permit be approved before 15 -day wait. _ _ _ _ .. _ _ _ Yes 14 Well located within area and strata authorized by Injection Order # (put. 10# in. comments) (For NA. _ _ _ _ _ _ _ _ _ _ _ 15 All wells within 114 mileareaof review identified (For service well only)_ 16 Pre -produced injector; duration of pre production less than 3 months _(For service well only) _ NA _ 18 Conductor string. provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ Conductor set forKRU. 3H-13 Engineering 19 Surface casing protects all known USDWs .. _ _ _ _ _ _ .. .. _ _ _ _ NA _ Surface casing set for KRU 3H-13. 20 CMT vot adequate to circulate on conductor 8 surf. csg . _ _ _ _ _ _ _____ _ _ _ _ NA_ _ Surface casing set and fully cemented 21 CMT vol adequate to tie-in long string to surf csg_ _ _ _ _ _ . ... NA _ 22 CMT. will cover all known productive horizons. _ _ ... _ No. Productive. interval will be completed with uncemented slotted I(ner 23 Casing designs adequate for C, T, B &. permafrost _ _ _ ...... _ _ Yes 24 Adequate tankage or reserve pit _ _ . _ _ Yes Rig has steel tanks; all waste. to approved disposal wells 25 If a_ re -drill, has. a 10-403 for abandonment been approved _ _ _ _ .... _ _ _ _ NA 26 Adequate wellbore separation proposed... _ _ _ .. _ Yes Anti -collision analysis complete; no major risk failures 27 If diverter required, does it meet regulations _ _ _ _ _ _ NA Appr Date 28 Drilling fluid program schematic $ equip list adequate _ _ _ _ Yes _ _ Max formation. pressure Is 4897 psig(15.5 ppg.EMW): will drill w/ 8.6. ppg EMW and. maintain overbal w/ MPD VTL 10/31/2018 29 BOPEs,_do they meet regulation _ _ _ _ _ _ _ Yes 30 BOPE_press rating appropriate; test to (put psig in comments)_ _ Yes MPSP is 4299; will test BOPS to 4800 psig_ 31 Choke. manifold complies w/API RP -53 (May 84) _ _ _ _ Yes 32 Work will occur without operation shutdown _ _ _ _ _ _ _ _ _ Yes 33 Is presence of 1-12S gas probable..... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ H2S measures required. _ 34 Mechanical -condition of wells within AOR verified (For service well only) . _ _ _ _ . NA. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 35 Permit can be issued w/o hydrogen. sulfide measures _ _ ...... _ _ . _ _ _ No. 3H -Pad wells are_H2S,bearing.. 1-12S. measures are required. Geology '36 Data, presented on potential overpressure zones... _ ..... _ _ _ _ Yes Appr Date 37 Seismic analysis of shallow gas. zones_ _ ..... _ NA DLB 10/24/2018 38 Seabed condition survey (if off -shore) _ _ ... NA 39 Contact name/phone for weekly progress reports_ [exploratory only] _ _ _ _ _ _ _ _ _ NA Geologic Date: Engineering Date Public Date Commissioner: Commissioner: Commissioner