Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-137DATA SUBMITTAL COMPLIANCE REPORT 2/25/2019 Permit to Drill 2181370 Well Name/No. KUPARUK RIV UNIT 3H-13AL1-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089-62-00 MD 9473 TVD 5997 Completion Date 11/20/2018 Completion Status 1 -OIL Current Status 1 -OIL UIC No REQUIRED INFORMATION Mud Log No ✓ / Samples ✓ No Directional Survey Yes DATA INFORMATION List of Logs Obtained: GR/Res (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH I Type Med/Frmt Number Name _ _ Scale Media No Start Stop P CH Received Comments ED C 30083 Digital Data 12/10/2018 Electronic File: 3H-13AL1-02 EOW - NAD27.pdf ED C 30083 Digital Data 12/10/2018 Electronic File: 3H-13AL1-02 EOW - NAD27.txt ED C 30083 Digital Data 12/10/2018 Electronic File: 3H-13AL1-02 EOW - NAD83.pdf ED C 30083 Digital Data 12/10/2018 Electronic File: 3H-13AL1-02 EOW - NAD83.txt Log C 30083 Log Header Scans 0 0 2181370 KUPARUK RIV UNIT 3H-13AL1-02 LOG HEADERS ED C 30115 Digital Data 7052 9473 12/13/2018 Electronic Data Set, Filename: 3H-13AL1-02 GAMMA RES.las ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 21VID Final.cgm ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 5MD Final.cgm ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 5TVDSS Final.cgm ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 2MD Final.pdf ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 51VID Final.pdf ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 5TVDSS Final.pdf ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 EOW - NAD27.pdf ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 EOW - NAD27.txt ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 Final Surveys TO 9473.csv ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 Final Surveys TO 9473.x1sx ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 Survey Listing.txt ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 Surveys.txt AOGCC Page 1 of 3 Monday, February 25, 2019 DATA SUBMITTAL COMPLIANCE REPORT 2/25/2019 Permit to Drill 2181370 Well Name/No. KUPARUK RIV UNIT 3H-13AL7-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089.62-00 MD 9473 TVD 5997 Completion Date 11/20/2018 Completion Status 1-0I1. Current Status 1-0I1- UIC No ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1- Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files 'o Core Photographs Y/& Geologic Markers/Tops 02_25_tapescan_BHI CTK.tM ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1- COMPLIANCE HISTORY 02_5_tapescan_BH I_CTK.txt ED C 30115 Digital Data 12/13/2018 Electronic File: 31-1-13AL1-02_output.tap ED C 30115 Digital Data 12/13/2018 Electronic File: 3H-13AL1-02 2MD Final.tif ED C 30115 Digital Data 12/13/2018 Electronic File: 31-1-13AL1-02 5MD Final.tif ED C 30115 Digital Data 12/13/2018 Electronic File: 31-1-13AL1-02 5TVDSS Final.tif Log C 30115 Log Header Scans 0 0 2181370 KUPARUK RIV UNIT 3H-13AL1-02 LOG HEADERS Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion Report 0 Directional / Inclination Data Mud Logs, Image Files, Digital Data Y /� Core Chips Y Production Test Information/ NA Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files 'o Core Photographs Y/& Geologic Markers/Tops Daily Operations Summary Cuttings Samples Y /� Laboratory Analyses Y NA COMPLIANCE HISTORY Completion Date: 11/20/2018 Release Date: 10/31/2018 Description Date Comments Comments: AOG( ( Page 2 of 3 Monday, February 25, 2019 DATA SUBMITTAL COMPLIANCE REPORT 2/25/2019 Permit to Drill 2181370 Well Name/No. KUPARUK RIV UNIT 31-1-13AL1-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089-62-00 MD 9473 TVD 5997 Completion Date 11/20/2018 Completion Status 1-0I1 Compliance Reviewed By: Current Status 1-0I1- UIC No Date: AOGCC Page 3 of 3 Monday, February 25, 2019 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION nrr CJ ifl1R WELL COMPLETION OR RECOMPLETION REPORT AND 1a. Well Status: Oil❑ • Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions: 1b. Well Class:` v,r,, Development Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 11/20/2018 14. Permit to Drill Number/ Sundry: 218-137 ' 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 11117/2018 15. API Number: 50-103-20089-62-00 , 4a. Location of Well (Governmental Section): Surface: 1182' FNL, 281' FWL, Sec 12, T12N, R8E, UM Top of Productive Interval: 3330' FNL, 450' FEL, Sec 2, T12N, R8E, UM Total Depth: 1525' FNL, 144' FEL, Sec 2, T12N, R8E, UM 8. Date TD Reached: 11/17/2018 16. Well Name and Number: 'KRU 3H-13AL1-02 9. Ref Elevations: KB: 71' GL: 34 BF: 17. Field / Pool(s): Kupamk River Field/Kuparuk River Oil Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation: ADL25531 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 498655 y- 6000475 Zone- 4 TPI: x- 497923 y- 6003607 Zone- 4 Total Depth: x- 498228 y- 6005412 Zone- 4 11. Total Depth MD/rVD: 9473 MD/ 5997 TVD ' 19. DNR Approval Number: LONS 84-134 & LONS 84-149 12. SSSV Depth MDrrVD: N/A 20. Thickness of Permafrost MDTrVD: 1628MD/ 1628 TVD 5. Directional or Inclination Survey: Yes E (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD1TVD: 7462 MD/ 5992' TVD 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16' 62.5 H-40 36' 110' 36' 110' 24" 245 sx AS I 9-5/8" 36 J-55 35' 3072' 35' 2929' 12.25" 1300 sx ASIII, 400 sx G, 70 sx ASI 7" 26 J-55 33' 5970' 33' 5173' 8.5" 300sx G, 175 sx ASI 3-1/2" 9.3 L-80 5808' 7755' 5808' 5983' 6.125" 311 sxG 2-3/8" 4.6 L-80 7720' 9473' 5990' 5997' 3" Slotted Liner 24. Open to production or injection? Yes ❑� No ❑ If Yes, list each interval open (MO/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Slotted Liner 7722'-9473' MD and 5990'- 5997' TVD" I(t118 ". - - -.- - IIIIIe- - -- 25. TUBING RECORD SIZE I DEPTH SET (MD) PACKER SET (MD/rVD) 3-1/2" 1 5836' 1 5808' MD/ 5050' TVD 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑� Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 12/1/2016 Method of Operation (Flowing, gas lift, etc.): Gas Lift Date of Test: 12/3/2018 Hours Tested: 14 Production for Test Period __O� Oil -Bbl: 924 Gas -MCF: 588 Water -Bbl: 734 Choke Size: 176 Gas -Oil Ratio: 637 Flow Tubing Press. 238 Casing Press: 1053 Calculated 24 -Hour Rate Oil -Bbl: 1584 Gas -MCF: 1008 Water -Bbl: 1258 Oil Gravity - API (corr): 23.6 Form 10407 Revised 5/2017 V7 -t- 21:7ONTINUED ON PAGE 2 RDDMS MU IEC'L 124 Submit ORIGINIAL on / 9 x.8. -a.I shck t 28. CORE DATA Conventional Corals): Yes ❑ No ❑Q Sidewall Cores: Yes ❑ No ❑� If Yes, list formations and intervals cored (MD/TVD, Fromffo), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑ If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1628 1628 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 7462 5992 information, including reports, per 20 AAC 25.071. Formation @ TPI - Kuparuk A-1 TD 9473 5997 Formation at total depth: Ku aruk A 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: Keith Herring - Authorized Title: Staff CTD Engineer Contact Email: keith.e.herring@cop.com Authorized Contact Phone: 263-4321 Signature: 11911's Date: 102 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 3H -13A Final CTD Schematic •• -• • 1 �- 3-1/2" Camco DS -nipple at 502' MD (2.813" min ID) 18", 82.5#, H-40 3-1/2" 9.3# LA0 EUE 8rd Tubing to surface shoe at 1 10'MD 3-1/2" Camco KBUG gas lift mandrels 2720', 4118', & 5077' MD 3-1/2" Carhop MMM gas lift mandrel 5757' MD 9-5/8", 36# J-55 11 3-1/2" Camco D -nipple at 5803' MD (2.750" min ID) shoe at 3072' MD Baker 3-1/2" GBH -22 seal assembly at 5812' MD (3" ID) Liner too Baker 5" x 7" ZXP liner top packer at 5808' MD sidetracked at 5970' MD (1997) KOP a( 7315' MD _ C Pe -santl rfs Baker Y1/2"XL Monobore 7229'-7249' MD hipstock Tight spat in 3-1/2" liner 7268'-7313' MD ' ' ' 3H-13AL1-D3 TD = 8243' MD 2-3/8" sicced liner wl deployment sleeve TOL = 7258' MD. BOL = 7644' MD 3H-1MI-1-02 TD = 9473' MD 2-318" slotted liner wl aluminum billet ----------------------- - TOL=7720'MD, BOL =WT IOD kar 3-1/2" XL MOnobore ilpstock ______ ___ % Anchoretl billet= 76BB' MD sand pads 7258'-7308' MD 7356'-7386' MD _ _ _ __ 7372'-7380'MD - ----- -- - 3H-13AL1Pa1 TD=90B5'MD nMoretl billet=7745' MD 3-1/2". 9.3#, L -BO linerI L 5808'-7755' MD :d liner wl anchored aluminum billet ?'MD, BOL = 10100' MD -13AL1 Al Pat TD = 10699' MD F = 7357' ELMD A stuck at 10462' MD - 2-318" BHA (DAL = 68.39') - 2" Coiled tubing (DAL = 3037) 'D= 10535' MD ier wl anchored aluminum billet 1, BOL = 10347' MD �- KUP PROD WELLNAME 3H -13A WELLBORE 3H-13AL1-02 ConoeoPhillips Well Attributes Max Max Angle gle&B) TD WaSka.lnr, Flew Nane KUPARUK RNER UNIT wxte.;APwvn LWWBore stlnu 50103200&962 PROD 992] '1,426.35 ACaMlrae) LomTYRI FIRIPpm1 Oale (Wpb6on EM Oah NBGM(RT BE Release Dale 150 12/22/2017 LnaWO. 37.01 1/9/1988 3HneALIN, I.IYA191SLE.PM Last Tag Vane9 xMma4c WAS) An.....,OepIR IRS.) El. (A.S.NWlbere Last MW By Last T89. sooPn Last Rev Reason IMNOER. 270 Annouaon End Dane WeIIMR IMW ay Rev Reason: Added CID OneTl9p dISPOL NZG. 119. spots 1i/1.10 jennall Casing Strings Lasln9 nascnptlon OD pp N pn) TeplNtBl eel Depth lrtltBl Set OepM (IWI.. yA'Len p_. erWe Tep TM1mtl AL1 -02 LINER 23]0 1.99 ],)21.9 9,4]3.0 460 LA0 STL Liner Details NominI ID Top IRNa1 T pIND IRRBI Top l Ilem Des Com (in) ),Y219 5.9899 ISSR 0834 ALUMINUM Aluminum Llner Top Biller 1920. CONSORT. Eonpp BILLET NIPPLE, ams Notes: General & Safely Ena Dale .mn.. 12/138018 NOTE: Vfew Scdenwlk wl Alaska Sc0emaod00 O96 LIFT'. 2720 I SURFACE: So CS ON e— GAS LIFT. a 11].6 ons UPT', E(R71 G46 uEP. E.]5].2 NIPPLE.E.O. C LOGATOR:5909.9 FA SLAaby:5a120 n WIMOW ERAS PRCp1CTION POST W. ED 5.9]D.D RPERF, ]2E.OT2J90— TIGHT SPOT TORISO (PERF, 125e.073ISO� 2 SET CTO LINER TOP: ] 257 9 TOFF SPOT. 73130 LINER, RFOS,F]]SS.G— ALINUNER.].OS7IF7 NAS ut LINER pW xn�M.� ]YA10,]s]D ..6 KIN U NEP: 7 MI 99073.9 . perations Summary (With Timelog L-pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sdd repth Stam Time End True DwM cipcode Atavly Code TMe P -T -x oposion (mKB) End Depth(aKB) 10/23/2018 10/23/2018 4.00 MIRU MOVE RURD P Work RD check list, prep injector & 0.0 0.0 09:30 13:30 reel for move, route inspection, coordinate pre -rig work 10/23/2018 10/23/2018 6.50 MIRU MOVE RURD P Continue RD checklist, trucks to arrive 0.0 0.0 13:30 20:00 -19:00 his, continued coordiantion w/ pre -rig OPS, DTH notified to break down tiger -tank line, disconnet hi -line power 10/23/2018 10/23/2018 0.40 MIRU MOVE RURD P Peak sows on location spot trucks, 0.0 0.0 20:00 20:24 PJSM 10/2312018 10/23/2018 1.30 MIRU MOVE RURD P Jack service unit, attach sow and 0.0 0.0 20:24 21:42 move service unit to beginning of access road. 10 minutes to pick up service side mats, wind increasing sharply. Some issues with hydraulic systems at the outset, - 10-15 min troubleshoot. 10/23/2018 10/23/2018 0.40 MIRU MOVE RURD P Jack sub, attach sow and stage 0.0 0.0 21:42 22:06 behind service unit. Pull cellar sills, plywood, and herculite. Pad inspection with pad operator/ company rep. Sign off on environmental form. 10/23/2018 10/23/2018 0.50 MIRU MOVE RURD P Drop sows, attach jeeps, reattach 0.0 0.0.. 22:06 22:36 - tandem sows to service and sub. Performed final walk around. Notify security of eminent move. 10/23/2018 10/23/2018 0.60 MIRU MOVE MOB P Roll off pad @ 22:38 toward 31-1-13 - 0.0 0.0 22:36 23:12 17.5 miles 10/23/2018 10/23/2018 0.30 MIRU MOVE MOB P 1.8 miles, at 2G access to spine road, 0.0 0.0 23:12 23:30 make sharp, off camber turn with service and sub & continue toward 3H. 10/2312018 10/24/2018 0.50 MIRU MOVE MOB P Pass through CPF2, continue on 0.0 0.0 23:30 00:00 1toward 3H-14. 10/24/2018 10/24/2018 5.30 MIRU MOVE MOB P Complete move from 2G -Pad to 3H- 0.0 0.0 00:00 05:18 Pad 10/24/2018 10/24/2018 1.00 MIRU MOVE MOB P Crew change, drop jeeps, lay herculte, 0.0 0.0 05:18 06:18 pull tree cap 10/24/2018 10/24/2018 3.70 MIRU MOVE MOB P Begin spotting sub, remove platform 0.0 06:18 10:00 hand mils & raise BOP's to clear tree. Thermal siphon blocking rig landing, call out facilities w/cra{Q�e,. cut down thermal siphon, continGe spotting sub, raise BOP's to max height to clear tree flange w/ BOP studs when setting down off jack. Spotted mats under sub 10/24/2018 10/24/2018 1.00 MIRU MOVE MOB P Spotted pits & laid mats, spotted TT 0.0 0.0 10:00 11:00 150' from rig 10/24/2018 10/24/2018 2.00 MIRU MOVE RURD P Begin RU check list, safe out walk 0.0 0.0 11:00 13:00 ways & landing, connect PUTZ, unlock reel & injector, begin NU BOPE Shop & 1/2 -Way House arrive on pad & spotted 10/24/2018 10/24/2018 1.50 MIRU WHDBOP NUND P Continue RU checklist, complete NU 0.0 0.0 13:00 14:30 BOPE, MU TT hard-line Rig Accept: 10124 @ 14:30 tire 10/24/2018 10/24/2018 2.00 MIRU WHDBOP RURD P Complte RU checklist 0.0 0.0- 14:30 16:30 I Page 1139 ReportPrinted: 1112 012 01 8 .: , perations Summary (with Timelog ">pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log smn Depm SIm1Tme and Time Dw(hr) Plena opcade Amvdy Code Time P-T-x opffl 4 (Po®) BN Depen Mort 10124/2018 10/24/2018 2.00 MIRU WHDBOP BOPE P Fluid pack, perform shell test, leak at 0.0 0.0 16:30 - 18:30 wing valve flange, valve crew attempting to solve issue, test gas alarms. S/I swab #1 in an attempt to bypass and move forward with BOP test, will attempt to blind while we cut coil. Crew change. Leek at bleeder on test, panel, repair. 10/24/2018 10/24/2018 3.50 MIRU WHDBOP BOPE P Re-aftempt shell test, leak at bleeder 0.0 0.0 18:30 22:00 on the night cap, repair. Pressure up, leak at wing valve bonnet post valve crew tightening. Shut Swab 1 and attempt to move forward, Swab one leaking past, bleeding out bonnet on wing valve. Vac slack, pull wing valve, blind flow block, fluid pack. 10/24/2018 10/25/2018 2.00 MIRU WHDBOP BOPE P Shell test -good. Test BOPE's, 0.0 0.0 22:00 00:00 250/4900 psi 2500 psi annular, (witnessed by Lou Laubenstein of the AOGCC) "•Start BOP test @ 22:00 Valve crew returned and grease locked swab #1 after test #1 --10 min @ startof test #4 pressures dropping fast, -re-grease stack -11:30 10/25/2018 10/25/2018 4.70 MIRU WHDBOP BOPE P Complete-re-grease stack, 131 0.0 0.0 00:00 04:42 Fail/Pass on re-grease. - 52 minutes total for Test #4 Had to exercise the annular a few time to get it to hold. Completed draw down. 10/25/2018 10/2512018 1.30 MIRU WHDBOP BOPE P Clear floor, test Inner reel iron 0.0 0.0 04:42 06:00 10/25/2018 10/25/2018 1.50 SLOT WHDBOP PRTS P PT PDL's & tiger tank line, clear floor, 0.0 0.0 06:00 07:30 slide in cart BOP Test 9.5 hrs 10/25/2018 10/25/2018 1.00 SLOT WELLPR CIRC P PJSM, remove UCC, cut & seal a-line, 0.0 0.0 07:30 08:30 stab on, reverse circulate, up to 3.8 bpm, pop off 10/25/2018 10/25/2018 1.90 SLOT WELLPR CTOP P RU hydraulic cutter, cut off CTC, cut 0.0 0.0 08:30 10:24 500' of pipe, found a-line at 12', tested e-line 10/25/2018 10/25/2018 1.80 SLOT WELLPR CTOP P Ream coil, instal CTC, pull test to 0.0 0.0 10:24 12:12 25K, head a-line, mistall UQC, PT to 4200 psi 1025/2018 10/25/2018 2.60 SLOT WELLPR CIRC P MU nozzle, stab on, circulate 1 coil 0.0 0.0 12:12 14:48 volume forward @ 2 bpm, begin PU tools, put mill & motor in hole, add 1' riser to stack for spacing out tools 1025/2018 10/25/2018 0.60 SLOT WELLPR CIRC P Clear all SIMOPS around TT, bleed IA 0.0 0.0 14:48 15:24 down to 500 psi, climbs back to 950 psi, bleed OA down to 679 psi 10/25/2018 10/25/2018 1.60 SLOT WELLPR PULD P PJSM, PU/PD BHA#1 Milling 0.0 51.0 15:24 17:00 Assemlby (2.72" stabalizer, BOT straight motor, D331 ridge-set mill), SSV not fully open, resolve Mill 2.79" no go 10/25/2018 10/25/2018 1.20 SLOT WELLPR TRIP P RIH w/ BHA#1, EDC open, Getting 51.0 4,990.0 17:00 18:12 some gas back at surface. 10/25/2018 10/25/2018 0.20 SLOT WELLPR DLOG P Tie into unique peak above K1 for+ 1' 4,990.0 5,014.0 18:12 18:24 I I I correction Page 2/39 ReportPrinted: 1112012018 ,. . perations Summary (with Timelog . pths) IF m 14 3H -13A .. Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Cog gat oepm SMTm0 Fid Tkm DIM pha..e op code NAvdr code Terse P -T -x oceras^ (m(B) End Depth(nNa) 10/25/2018 10125/2018 0.10 SLOT WELLPR TRIP P Continue to RIH. 5,014.0 5,206.0 18:24 18:30 10/25/2018 10/2512018 0.10 SLOT WELLPR DLOG P Logging again to appease the Geo. no 5,206.0 5,245.0 18:30 18:36 correction. 10/25/2018 10/2512018 1.50 SLOT WELLPR DISP P Continue in hole, slight CT Wt boble, 5,245.0 5,777.0 18:36 20:06 @ 5803', RIH to 5815' sat down, 4 k WOB. PU 34 k lbs. PUH slowly, ramp up rate from 0.9 to 1.75 bpm. Current losses 1.25 bpm to the formation against an open choke. Tum coil and well over to milling fluid. 10/25/2018 10/25/2018 1.00 SLOT WELLPR MILL P Close EDC, PU Wt 35 k bs, ramp 5,777.0 5,794.0 20:06 21:06 pump to milling rate. CT 3014 psi @ 1.80 bpm in, 1.13 bpm out, free spin diff 427 psi, WH 1 psi, IA 922 psi, OA770 psi. CT Wt 17 k lbs, RIH, clean @ 5803' no motor work or WOB. Stall @ 5815', PU 34 k lbs, mill through obstruction to 5825'. Pick up through area, Clea, no motor work 10/25/2018 10/25/2018 0.50 SLOT WELLPR MILL P Drift with pumps off 5,794.0 7037.0 21:06 21:36 10/25/2018 10/25/2018 0.40 SLOT WELLPR DLOG P Log the K1 for -10' correction. 7,037.0 7,104.0 21:36 22:00 10/25/2018 10/25/2018 0.20 SLOT WELLPR MILL P Continue to RIH dry, set down @ 7,104.0 7,263.81 22:00 22:12 7263.81, WOB 1.6, PU Wt 40 k Ibs. " Bleed IA to 775 psi - gas 10/25/2018 10/25/2018 0.60 SLOT WELLPR MILL P Milling tubing issue @ 7263.8' 7,263.8 7,379.0 22:12 22:48 CT 2961 psi @ 1.75 bpm in, 1.10 bpm out, free spin 394 psi, IA776 psi OA 787 psi, WH 1 psi CT Wt 19 k Ibs, Mill through easily, PU, clean. Continue to RIH 10/25/2018 10/25/2018 0.40 SLOT WELLPR MILL P Set down @ 7379', PU 40 k lbs, RBIH, 7,379.0 7,400.0 22:48 23:12 saw nothing tis time, mill to 7,400' - clean 10/25/2018 10/25/2018 0.20 SLOT WELLPR DLOG P PUH Wt 38 k lbs, PUH to 7082' and tie 7,400.0 7,099.0 23:12 23:24 into the K1 for a +1' correction 10/25/2018 10/26/2018 0.60 SLOT WELLPR DLOG P PUH to 5775' bit depth, logg CCL to 7,099.0 7,400.0 23:24 00:00 below planned WS set depth. 10/26/2018 10/26/2018 1.50 SLOT WELLPR DLOG P Continue to log CCL to below planned 7,099.0 7,400.0 00:00 01:30 WS set depth. Time out 5x5 sweeps 10/26/2018 10/2612018 1.60 SLOT WELLPR TRIP P Park, open EDC, PU Wt 38 k lbs. 7,400.0 45.0 01:30 03:06 chase sweeps to bit then POOH. 10/26/2018 10/26/2018 1.40 SLOT WELLPR PULD P Bump up, bleed off pumps, open up at 45.0 0.0 03:06 04:30 the stack, flood up, flowchec observed flow. Tag up, space out, PUD BHA#1 10/26/2018 10/26/2018 1.70 PROD1 RPEQPT PULD P PU & PD BHA #2, 3.5 " monobore XL 0.0 73.0 04:30 06:12 whipstock, mill came out 2.79" no-go 10/2612018 10/26/2018 1.40 PROD1 RPEQPT TRIP P RIH w/BHA #2, EDC open 73.0 7,090.0 06:12 07:36 10/26/2018 10/26/2018 0.20 PROD1 RPEQPT DLOG P Log K1 for -9' correction, PUW = 34K 7,090.0 7,130.0 07:36 07:48 1026/2018 1026/2018 0.40 PRODT RPEQPT TRIP P Continue RIH, adrive at setting depth, 7,130.0 7,350.5 07:48 08:12 close EDC, PUW = 35K, bring up pumps, sheard off WS @ 3700 psi, set down 4K, TOWS -7340', oriented 30" ROHS, set down 5K, good, PUW = 36K Page 3139 ReportPrinted: 11/20/2018 Aerations Summary (with Timelog . pths) 3H -13A ' Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SU Stait Time End Time Ekr(h1 Pheed Op(.Ode Activity Code Time P -T-% Opetaion (Po®) End Depth WS) 10/26/2018 10/26/2018 1.10 PROD1 RPEQPT CIRC P Open EDC, pump 44 bbl 113K LSRV 7,350.5 7,342.0 08:12 09:18 pill, w/ 44 bbl out bit, bullhead 30 bbl into perfs, bleeding down IA & OA 10/26/2018 10/2612018 1.70 PROD1 RPEQPT TRIP P POOH, park at 535', flow -check well, 7,342.0 73.0 09:18 11:00 have flow, swap tools, pre -load PDL (Unusual WOB values from DPS when POOH), PJSM 10/26/2018 10/26/2018 1.00 PROD1 RPEQPT PULD P PUD BHA#2 73.0 0.0 11:00 12:00 10/26/2016 10/26/2018 0.70 PRODt WHPST PULD P PD BHA #3 Window Assembly (0.6* 0.0 74.0 12:00 12:42 AKO motor, 2.80 string reamer, 2.80" - window mill), 10/26/2018 10/26/2018 0.80 PROD1 WHPST RGRP P Allow Peter Obden time to adjust PLC 74.0 74.0 12:42 13:30 software on inj/reel (Rig Service) 10/26/2018 10/26/2018 0.80 PROD1 WHPST PULD P Complete PD BHA#3, slide in car[, 74.0 74.0 13:30 14:18 changeout pack -offs, MU to coil, tag up, set counters 10/2612018 10/2612018 1.30 PROD1 WHPST TRIP P RIH w/BHA #3 74.0 7,105.0 14:18 15:36 10/26/2018 10/26/2018 0.10 PROD1 WHPST OLOG P Log K7 for -9' correction, close EDC, 7,105.0 7,129.0 15:36 15:42 PUW = 36K 10/26/2018 10/26/2018 0.30 PROD1 WHPST TRIP P Continue RIH, dry tag TOWS at 7,129.0 7,341.5 15:42 16:00 7342.2', PUW = 37K, tag pumping at 7341.5' 10/26/2018 10/26/2018 1.00 PROD1 WHPST WPST P Milling window, 1.8 bpm, FS = 455 psi, 7,341.5 7,342.5 16:00 17:00 CWT = 18K, WOB = 1.3K, circ = 3335 psi, WHP = 0 psi, losses -10 bph 10/26/2018 10/26/2018 3.00 PROD1 WHPST WPST P Milling window 1 ft/hr, 7,342.5 7,346.5 17:00 20:00 CT 3345 psi, 1.83 bpm in, 1.72 bpm out, FS = 455 psi, WH 9, IA 731 psi, OA 822 psi CWT = 13K, WOB = 2.3, WOB fell off sharply from 7345.5' with increase in moto work Losses 6 bph 10/26/2018 10/2612018 3.40 PROD1 WHPST WPST P CT 3387 psi, 1.83 bpm in, 1.73 bpm 7,346.5 7,350.5 20:00 23:24 out, FS = 455 psi, WH 9, IA 735 psi, OA871 psi CWT = 15K, WOB = 0.75, Estimate bottom of window 7347' Losses 6 bph 10/26/2018 10/27/2018 0.60 PROD? WHPST WPST P Start drilling open hole 7,350.5 7,357.4 23:24 00:00 CT 3546 psi, 1.83 bpm in, 1.73 bpm out, FS = 455 psi, WH 9, IA 738 psi, OA 900 psi CWT = 15K, WOB = 0.75, Losses 6 bph 10/27/2018 10/27/2018 0.60 PROD1 WHPST WPST P Drill rat hole @ 8-15 Whir. 7,357.4 7,362.0 00:00 00:36 Losses 3 bph Bleed OA from 900 psi to 627 psi Bleed IA from 740 psi to 680 ps 10/27/2018 10/27/2018 1.80 PROD1 WHPST WPST P Performed reaming passes, as milled 7,362.0 7,362.0 00:36 02:24 30 'ROHS, HS, 60, and 210' ROHS. Small, diminishing, spike in motor work @ -7342' on the first 4 passes. -515 Ib WOB lug at 7345' on up pass at 210 *ROHS. Dry drift - clean, tag rat hole bottom Losses 3 bph Page 4139 ReportPrinted: 11/20/2018 aerations Summary (with Timelog . .pths) 3H-13A .. Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slant Time End Tine DwM %use Op Code A ity Code Time P-T-X OPMEOn rt Dept, S (nKB) 1 End Daps () 10/27/2018 10/27/2018 0.40 PROD1 WHPST DISP P PU Wt 38k PUH, park, open EDC, 7,362.0 7,287.0 02:24 02:48 pump 10 bbl sweep, chase with new mud @ 2.20 bpm in, 2.06 bpm out, open choke, WH 16 psi. displace sweep to wellbore. 10/27/2018 10/27/2018 1.30 PROD1 WHPST DISP P POOH chasing sweep to surface while 7,362.0 60.0 02:48 04:06 displacing wellbore to new mud - System #1 Choke acting up, most likely window cuttings. 10/27/2018 10/27/2018 1.30 PROM WHPST PULD P PJSM, Bump up, space out, PUD & 60.0 0.0 04:06 05:24 LD BHA#3, window milling assembly. 10/27/2018 10/27/2018 0.70 PROD1 DRILL CIRC P Jet stack 0.0 0.0 05:24 06:06 10/27/2018 10/27/2018 3.10 PROD1 DRILL PULD T PU & PD BHA #4, AL1 build/turn 0.0 0.0 06:06 09:12 drilling assembly (2.5 'AK motor with RB Baker bit), check pack offs Hung up high-bend motor working through stack & past swab/master, work to free BHA, pull back up into PDL, pop off lubricator, re-grease motor, index bit to correct orientation, pour 5 gal LVT down slack, complete PD 10/27/2018 10/27/2018 1.50 PROD1 DRILL TRIP P RIH w/ BHA #4 0.0 7,090.0 09:12 1042 10/27/2018 10/27/2018 0.10 FROM DRILL DLOG P Log K1 for-8.5' correction 7,090.0 7,108.0 10:42 10:48 10/27/2018 10/27/2018 0.60 PROD1 DRILL TRIP P Continue RIH, close EDC, PUW = 7,108.0 7,362.0 10:48 11:24 37K, pull into cased hole to trouble- shoot DD's HSTF values, RBIH 10/27/2018 10/27/2018 1.60 PROD1 DRILL DRLG P Drilling, 1.8 bpm in, 1.66 bpm out, FS 7,362.0 7,512.0 11:24 13:00 = 550 psi, CWt = 15.4K, WOB = 2.4K, circ = 3281 psi, BHP = 3469 psi, WHP = 160 psi, bump up from 11.2 ppg to 11.3 ppg, losses healing, returns = 95%, avg ROP = 93 fph " RA tag = 7347', TOWS = 7340', BOW = 7347' 10/27/2018 10/27/2018 3.10 FROM DRILL DRLG P Drilling, 1.8 bpm in, 1.7 bpm out, 11.4 7,512.0 7,670.0 13:00 16:06 ppg at window, CWT= 11.8K, WOB = 1.8K, BHP = 3581 psi, circ = 3378 psi EOB called at 7670' 10/27/2018 10/27/2018 0.50 PROM DRILL DLOG P Log K1 for +1' correction, confirm RA 7,670.0 7,370.0 16:06 16:36 at 7347' 10/27/2018 10/27/2018 1.30 FROM DRILL TRIP P POOH, EDC open 7,370.0 72.0 16:36 17:54 10/27/2018 10/27/2018 1.30 PROM DRILL PULD P - Bump up, Space out, Crew change, 72.0 0.0 17:54 19:12 PUD BHA #4, AL1 buildlturn drilling assembly. 10/27/2018 10/27/2018 1.00 FROM DRILL PULD P PU & PD BHA#5, AL1 lateral drilling 0.0 65.9 19:12 20:12 assembly, 0.5° AKO W HYC A2 RR bit, Check 7 replace pack offs. Bump up, set counters and away we go! 10/27/2018 10/27/2018 1.40 PROD1 DRILL TRIP P RIH, Park @ 500' and shallow test 65.9 7,090.0 20:12 21:36 agitator,grab screen shots. BPM Diff psi Frequency Hz 1.0 380 20.4 1.5 800 15.0 1.8 1244 1244 Page 5139 Report Printed: 11120/2018 . perations Summary (with Timelog pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slmt7xna Entl Tine Dur (Td PhaseOp Code Activity Code Time P -M Operation B (fiKBP� EndDepth flKB f ) 10/27/2018 10/27/2018 0.20 PROD? DRILL DLOG P Tie into the K1 for a -9.5' correction. 7,090.0 7,114.5 21:36 21:48 10/27/2018 10/272018 0.30 PROD1 DRILL TRIP P PU Wt 35 k lbs, continue to RIH. 7,114.5 7,670.0 21:48 22:06 Widow & build clean. 10/27/2018 1012812018 1.90 PROD1 DRILL DRLG P CT 4183 psi @ 1.84 bpm in, 1.70 bpm 7,670.0 7,890.0 22:06 00:00 out, Free spin diff 1470 psi, annular 3644 psi, WH 194 psi, IA 684 psi, OA 666 psi. Mud conditioned down quickly, picked up to reacquire numbers CT 4017 psi @ 1.83 bpm in, 1.73 bpm out, free spin 1113 psi. CT Wt 11 k Ib, WOB 2.2 k lbs, ROP 100 fl/hr. 7920' PU Wt 39 k lbs, pump 5x5 low/high sweep Average ROP 115 ft/hr 10/28/2018 10/28/2018 1.40 PROD1 DRILL DRLG P CT 4183 psi @ 1.84 bpm in, 1.70 bpm 7,890.0 8,070.0 00:00 01:24 out, Free spin diff 1470 psi, annular 3644 psi, WH 194 psi, IA 684 psi, OA 666 psi. Mud conditioned down quickly, picked up to reaquire numbers CT 4017 psi @ 1.83 bpm in, 1.73 bpm out, free spin 1113 psi. CT Wt 11 k Ib, WOB 2.2 k lbs, ROP 100ft/hr. 7920' PU Wt 39 k lbs, pump 6x5 lowthigh sweep Average ROP 128 ft/hr 1028/2018 10/28/2018 0.20 PROD1 DRILL WPRT P PU Wt 39 k lbs 8,070.0 7,673.0 01:24 01:36 400'wiper#1 10282018 10/28/2018 0.20 PROD? DRILL WPRT P RBIH 7,673.0 8,070.0 01:36 01:48 RIH Wt 16 k lbs 10/28/2018 1028/2018 0.70 PROD1 DRILL DRLG P CT 4252 psi @ 1.83 bpm in, 1.73 bpm 8,070.0 8,235.0 01:48 02:30 out, Free spin diff 1261 psi, annular 3684 psi, WH 202 psi, IA 691 psi, OA 724 psi. CT Wt 5.6 k Ib, WOB 2.7 k lbs, ROP 245 ft/hr. Average ROP 235 ft/hr 10/28/2018 1028/2018 2.10 PROD1 DRILL DRLG P Hit something hard 8235', PU and 8,235.0 8,425.0 02:30 04:36 restart, PU Wt 42 k lbs CT 4563 psi @ 1.83 bpm in, 1.74 bpm out, annular 3680 psi, CT Wt 5.8 k Ib, WOB 2.5 k lbs, ROP 16 -200 fl/hr. Drilled through@ 8241' took a little influx, pinched in choke to 11.8 at the window. 1.83 bpm in, 1.72 bpm out Average ROP 90 it/hr 10/28/2018 10/28/2018 0.20 PROD1 DRILL WPRT P PU Wt 41 klbs 8,425.0 7,680.0 04:36 0448 745'wiper#2 10/282018 10/28/2018 0.20 PRODt DRILL WPRT P RBIH 7,680.0 8,425.0 04:48 05:00 RIH Wt 16 k lbs 10/2812018 1028/2018 1.00 PROD1 DRILL DRLG P CT 4245 psi @ 1.79 bpm in, 1.69 bpm 8,425.0 8,512.0 05:00 06:00 out, 1,162 free spin diff, annular 3784 psi, CT Wt 8.8 k to, WOB 2 k IDS, ROP 135 ft/hr, PUW = 45K, crew change Page 6/39 Report Printed: 11/2012018 perations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log struma End Time Our (M) Phase OP Code Activity Code Time P -T -X Opaati, SmdONdt (F5 End Depth8,6 (0.0 10/28/2018 10/28/2018 2.00 PROD1 DRILL DRLG P Drilling, FS = 1138 psi, CWT = 0.5K, 8,512.0 6,600.0 06:00 08:00 WOB = 1.2K, BHP = 3753 psi, W HP = 240 psi, circ = 4313 psi, -93% returns, pump 5x5 sweeps, lower ROP through 125 API lithology (down'to 40 fph), Avg ROP 44 fph 10/28/2018 10/28/2018 2.00 PROD1 DRILL DRLG P Drilling, CWT =3.3K, WOB =1.5K, 8,600.0 8,684.0 08:00 10:00 BHP = 3764 psi, circ = 4470 psi, -91% retruns, continued lower ROP (45 - 70 fph), drilling w/ negative CWT, PUW's _-44K-46K, Avg ROP 42 fph 10/28/2018 10/28/2018 0.60 PROM DRILL WPRT P Wiper up -hole to window, chasing 8,684.0 7,080.0 10:00 10:36 sweeps, PUW = 48K Pulled early to allow Peter O'brien chance to verify ini/mel changes & reboot software update prior to leaving slope, & clean up higher gamma silt interval 10/28/2018 10/28/2018 0.20 PROD1 DRILL DLOG P Log K1 for+4' correction 7,080.0 7,120.0 10:36 10:48 10/28/2018 10/28/2018 0.30 PROM DRILL SVRG PPeter verifies inj/reel changes & 71120.0 7,120.0 10:48 11:06 reboots software, software install complete (shut -down pump, shut-in choke) 10/28/2018 10/28/2018 0.90 PROD1 DRILL WPRT P Wiper in -hale, RIW = 10.3K, BHP 7,120.0 8,684.0 11:06 12:00 spiked at 8687', PUW = 44K, line-up to choke A, RBIH, stacking weight beginning at 8625' up through Iowa Al silt 10/28/2018 10/28/2018 2.00 PROD1 DRILL DRLG P BOBD, CWT= -7K, WOB =1.I K, BHP 6,684.0 8,920.0 12:00 14:00 = 3783 psi, W HP = 275 pis, circ = 4367 psi CWT coming back drilling past higher gamma interval, drilling break at -8760', Avg ROP 118 fph Blew -down choke B, medium sized silt cavings observed 10/28/2018 10/28/2018 1.70 PROD1 DRILL DRLG P Drilling, CWT = 4.3K,WOB = 1.8K, 8,920.0 9,085.0 14:00 15:42 BHP = 3830', circ = 203 psi, BHA wiper from 8955', PUW = 42K, pump 5x5 sweeps 10/28/2016 10/28/2018 0.30 PROD1 DRILL WPRT P Wiper up -hole, PUW =42K 9,085.0 8,265.0 15:42 16:00 10/28/2018 10/28/2018 0.80 PROD1 DRILL WPRT P Wiper in-hole, stack weight at 8349', 8,265.0 9,085.0 16:00 16:48 PU, RBIH, stacking weigt at 8390' to 8442', up to -2.7K WOB on PU's, pump HiVis sweeps, continue stacking through to 8635', PUW = 52K Bore & annular climbing, begin packing off, PUH, pulling heavy through to 8500'(-5K WOB), reciprocate to work off packoff, pulled up to 65K 10/28/2018 10/28/2018 2.00 PROD? DRILL TRIP T Pull to window, building sweeps, 9,085.0 7,233.0 16:48 18:48 circulate bottoms up, pump, large amounts off large cavngs returned to the shaker. Page 7/39 Report Printed: 11/20/2018 perations Summary (with Timelog . _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time log Sdrtrima Eq Tire drtnr) phase Op catla AWAY cane rens P -r -x opera§M San Depth MM Ea Depth tea) 10/28/2018 10/2812018 2.00 PROD1 DRILL CIRC T RIH, window and build clean, turned 7,233.0 7,220.0 18:48 20:48 around in middle of build, pulled to just below window, RBIH to EOB, clean, pull to just below window chasing 5x5 sweep, clean - sweep carried 1/8" caving's to surface, RBIH to 7780, trip in was clean. PU Wt, 36 k lbs, dean, Pull -4k WOB @ 7760', RBIH, SID @ 7667' 4.5K WOB, PU 52 K, 4.5 k WOB, pop free. Tum around at 7737' RBIH to 7780' clean, PU 36 k lbs, 4.3 k lbs WOB @ 7759' again. Tum around @ 7579', RBIH, to 7781', pull 10 it/min, pumping 1.8 bpm, -Cleanl Build clean window clean. 10/28/2018 10/28/2018 1.80 PROD1 DRILL TRIP T Continue out of hole, chase three 7,220.0 70.0 20:48 22:36 separate 5x5 sweeps timed to exit at Window, 3000', and surface. Diminishing solids returns each time. Perform shallow jog at surface, Pre load PDL while POOH. Last sweep at surface was clean. 10/28/2018 10/29/2018 1.40 PROD1 DRILL PULD T Bump up, PUD and LD BHA # 5. Bit 70.0 0.0 22:36 00:00 graded 1,1, NO 10/29/2018 10/29/2018 1.40 TROO1 PULD T PU & PD BHA #6, Billet W open hole 0.0 70.0 00:00 01:24 anchors. 10/29/2018 10/29/2018 1.30 PROD1 STK TRIP T RIH 70.0 7,090.0 01:24 02:42 10/29/2018 10/29/2018 0.20 PROD1 STK DLOG T Tie into the K1 marker for -8' 7,090.0 7,123.4 02:42 02:54 1 correction. 10/29/2018 10/29/2018 0.50 PROM STK WPST T Continue in hole, PU Wt 37 k @ 7,123.4 7,756.8 02:54 03:24 7285', park, down on pump, Close EDC, continue in hole, Window and build clean. Park on depth, PU 30k to neutral CT Wt, Online w pump, observe sheer @ 4600 psi. Stack 3 k WOB on billet, PU Wt 36 K 10/29/2018 10/29/2018 1.50 PROD1 STK TRIP T PU Wt 36 K 7,756.8 70.0 03:24 D4:54 PUH, Open EDC, Continue out of hole. 10/29/2018 10/29/2018 1.40 PRO STK PULD T Bump up, PUD & LD BHA #6. Crew 70.0 0.0 04:54 06:18 change. 10/29/2018 10/29/2018 1.30 PROD1 STK PULD T PD BHA#7 KO/Lateral Assembly 0.0 73.0 06:18 07:36 (NOV agitator, 0.5°AKO motor, RB P104 bit), slide in cart, MU to coil, tag up, set counters 10/29/2018 10/29/2018 1.40 PROM STK TRIP T RIH w/ BHA *7, close EDC, shallow 73.0 7,090.0 07:36 09:00 test @ 645' & grab transducer screenshot, 1.8 bpm, circ = 4430 psi, FS = 1070 psi 10/29/2018 10/29/2018 0.20 PROD1 STK DLOG T Log K1 for -8' correction, PUW = 34K 7,090.0 7,134.0 09:00 09:12 10/29/2018 10/29/2018 0.70 PROD1 STK TRIP T Continue RIH, dry tag TOB at 7746.5', 7,134.0 7,745.8 09:12 09:54 PUW = 38K, pumping 1.8 bpm, milling at 7745.8' 10/29/2018 10/29/2018 0.30 PROD1 STK KOST T Milling, pumping 1.82 bpm, FS = 1070 7,745.8 7,754.4 09:54 10:12 psi, CWT = 16.2K, WOB =.I K, BHP = 3608 psi, WHP = 112 psi, circ = 4247 psi WOB & motorwork milling off immediatley, begin chasing to find any WOB, not seeing WOB or motorwork Page 8139 ReportPrinted: 11120/2018 aerations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SW Tone End Tyne OorM phase Op Code Acift Code Time P -T -x opgetion stedoepth il") End Dpth(MO) 10/29/2018 10/29/2018 0.10 PR551 STK KOST T PUH, PUW = 37K, RBIH to dry tag 7,754.4 7,756.0 10:12 10:18 billet & troubleshot issue, tag TOB 7752.8', a lot of aluminum over shakers 10/29/2018 10/29/2018 0.80 PROD1 STK KOST T Go back to milling, stall getting going, 7,756.0 7,762.0 10:18 11:06 milling from 7756', CWT = 13K, WOB = 1.36K, dip = 1476 psi, chasing WOB to get away from billet, stall at 7758.4' (approx slips depth), PUW = 42K, drill to 7762' & stall (up to 115 fph), PUW = 38K, begin dragging -4K WOB at 7755', RBIH & stall at 7758', RBIH, packing off, rate out falls to 0 bpm out 10/29/2016 10/29/2018 0.40 PRODi DRILL CIRC T Packed off at MM beginning at 7752', 7,762.0 7,329.0 11:06 11:30 PUH to above billet w/ no returns, no over pull or negative WOB, large caving appear over shaker, pump 10x10 sweeps working PUH to cased hole, packed off again at 7617' (believe at surface), blow down choke B, swap over, packed off immediately in cased hole (believe packed off at surface). 10/29/2018 10/29/2018 0.80 PROM DRILL CIRC T Blow down, choke A&B, blowdown 7,329.0 7,030.0 11:30 12:18 MM & snake, back on choke B, packed off, BHP climbing, chokes by- passed as both are packed off, open MP lines to check pressures to determine pack -off location, see 1200 psi on MP line, pack -off likely in return line. Confer w/ town, decision made to reduce pump rate. 10/29/2018 10/29/2018 1.00 PROD1 DRILL CIRC T Slowly PUH, formulate plan to reverse 7,030.0 6,856.0 12:18 13:18 circulate through return line: shutdown pumps, close lower 2" pipe -slip rams, close SR 1 & SR2, close R8, open RC1 & RC2, bleed off above rams through riser, MU 2" 90 on riser. Pump back & have communication through return line hose. Line up down coil, have returns, though quickly re -pack off 10/29/2018 10/29/2018 1.20 PROM DRILL CIRC T Bi -pass chokes & MM, pump at 1.9 6,856.0 6,841.0 13:18 14:30 bpm (11.14 prig at window), pump sweeps, circulate bottoms up, blow down chokes A & B, snake MM & button back up. Have returns, chokes & MM are all cleared. 10/29/2018 10/29/2018 0.20 PROD1 DRILL DLOG T Log, K1 for +.5' correction 6,841.0 7,340.0 14:30 14:42 _ 10/2912018 10/29/2018 0.80 PROD1 DRILL CIRC T RIH to TOB, pump 5x5 sweeps, chase 7,340.0 7,340.0 14:42 15:30 1 to TOWS, circulate bottoms up 10/29/2018 10/29/2018 0.20 PROM DRILL TRIP T RBIH to TOB, drop pumps, tag at 7,340.0 7,758.0 15:30 15:42 7759', PUW = 35K (approximate depth of slips) 10/29/2018 10/29/2018 1.50 PROD1 DRILL TRIP T RBIH, 1.8 bpm at —3.5 fph, pass 7,758.0 7,762.4 15:42 17:12 7758', continue in slow to 7762', BHP = 3775 psi, WHP = 249 psi, CWT = 15.5K, WOB=.25K, increasing WOB & motonvark from 7761' Page 9139 Report Printed: 11/20/2018 derations Summary (with Timelog . pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Tine EW line Dff(hn Ruse op CMD Ach*Cade Time P-T.X opmbw SW DepN MM) EM Depin(MB) 10/29/2018 10/29/2018 1.30 PROD? DRILL DRLG T Drilling from 7762.4', CWT= 16K, 7,762.4 7,772.0 17:12 18:30 WOB = 1.4K, dp = 1360 psi, WOB spiking to 2.4K, then falling off, increase ROP to 112 fph, seeing little WOB, PUH above billet, PUW =44K, RBIH to tag bottom (If in old hole should now know) 10/29/2018 10/29/2018 0.60 PROD1 DRILL DRLG T Drilling, CWT =7K, WOB =2.4K,BHP 7,772.0 7,848.0 18:30 19:06 = 3748 psi, WHP = 152 psi, NBI indicates getting away from old hole 10/29/2018 10/29/2018 0.40 PROD1 DRILL TRIP T Dry drift billet area up & down, clean, 7,848.0 7,848.0 19:06 19:30 PUW = 48K, short -1.8K WOB spike at 7805' 10/292018 10/2912018 2.20 PROM DRILL DRLG T Drilling, CWT= 1OK, WOB = 1.7K, 7,848.0 8,181.0 19:30 21:42 BHP = 3721 psi, WHP = 138 psi, - 97% returns, pumps 5x5 sweeps, Avg ROP 151 fph Swap to mud system #2, new mud at bit 7912' 10/292018 10/292018 0.30 PROD1 DRILL WPRT T Wiper up-hole, PUW =38K 8,181.0 7,780.0 21:42 22:00 10/29/2018 10/29/2018 0.30 PROD1 DRILL WPRT T Wiper in-hole, RIW = 16K 7,780.0 8,181.0 22:00 22:18 10/29/2018 10/30/2018 1.70 15ROD1 DRILL DRLG T Drilling, 1.8 bpm, CWT= 11K, WOB = 8,181.0 8,486.0 22:18 00:00 2K, BHP = 3737 psi, WHP = 335 psi, circ = 4500 psi, drop to 1.5 bpm to allow DD to grab survey 10/30/2018 10/30/2018 0.60 PRODt DRILL DRLG T OBD, CT Wt 8 k be, 1.6 k WOB, 8,486.0 8,565.0 00:00 00:36 holding 11.8 ppg @ the window WH 246 psi, IA 690 psi, OA 740 psi PU 8553'44 k free spin on restart 1006 psi 10/30/2018 10/30/2018 0.20 PROD1 DRILL WPRT T PU Wt 37 k Ibs, Wiper trip #2-800' 8,565.0 7,790.0 00:36 00:48 Drag neg WOB, -1.68 K lbs, @ 7800' 10/30/2018 10/30/2018 0.30 PROD1 DRILL WPRT T RBIH 7,790.0 8,565.0 00:48 01:06 Stack out 7792'4.7 K WOB, 7804'3.3 k WOB, and 7816'2.3 k WOB, bounced on don, didn't pick up. Clean the rest of the way to bottom. 10/30/2018 10/30/2018 1.00 PROD1 DRILL DRLG T CT 4200 psi @ 1.79 bpm in 1.74 bpm 8,565.0 8,704.0 01:06 02:06 out, free spin diff 1027 psi, CT RIH Wt 16 k lbs, annular 3800 psi OBD, CT Wt 6 k lbs, WOB 1.94 k lbs, 10/302018 10/30/2018 2.00 PROD1 DRILL DRLG T 8,706' PU WT 45k lbs - Something 8,704.0 8,770.0 02:06 04:06 hard, ROP fell to 23 ft/hr CT Wt 4.8 k lbs, WOB 2.30 k bs, ROP 33 N hr - most likely found the fault Gamma climbed rapidly to 143 API max 153, seeing soft clay balls at the shaker. 10/302018 10/30/2018 0.70 PROD1 DRILL DRLG T Drilling break, Gamma claned up and 8,770.0 8,877.0 04:06 04:48 resistivity returned to normal. 10/302018 10/302018 0.30 PROD1 DRILL DRLG T On another hard spot. ROP down to 8,770.0 8,878.0 04:48 05:06 10 f/hr. 10/302018 10/3012018 0.50 PROM DRILL DRLG T Drilling break and losses, 1.78 in, 1.34 8,878.0 8,965.0 05:06 05:36 bpm out, slowly healing PU 39 k RBIH, 10/30/2018 10/3012018 0.60 PROD1 DRILL WPRT T PU Wt 40 k lbs, Wiper trip #3 to 8,965.0 7,358.0 05:36 06:12 window for tie in. 10/30/2018 10/30/2018 0.20 PROM DRILL DLOG T Tie into the RA tag for+2' correction. 7,358.0 7,392.0 06:12 06:24 10/30/2018 10130/2018 0.60 PROD1 DRILL WPRT T RBIH 7,392.0 8,965.0 06:24 07:00 Page 10139 Report Printed: 11/2012018 Aerations Summary (with Timelog - _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log sranrme End Tore DmIhn Phase Op Code Activity Cade T. P -T -x operation S(ftKB)N End Dr?dt (11103) 10/30/2018 10/30/2018 0.90 PROD1 DRILL DRLG T Ct 4637 psi, @ 1.83 bpm in, 1.76 bpm 8,965.0 9,085.0 07:00 07:54 out, Free spin diff 1123 psi, annular, 3824 psi, IA 703, Oa 784 psi CT WT 7 k lbs, WOB 1.86 k lbs 9053' PU Wt 39 k lbs Average WOB. 10/30/2018 10/30/2018 2.00 PROD1 DRILL DRLG P Drill ahead 9,085.0 9,365.0 07:54 09:54 9191' PU Wt 52 k lbs, pump 5x5 sweep and pul BHA Wper, RBIH ROP increased from 100 to 240 as sweep exited, adding 1% 776 to high vis 10/30/2018 10/3012018 0.30 PROD1 DRILL WPRT P PU Wt 40 k lbs, Wiper trip #1 - 800' 9,365.0 8,565.0 09:54 10:12 10/30/2018 10/30/2018 0.30 PROD1 DRILL WPRT P RBIH, 8,565.0 9,365.0 10:12 10:30 S/D 8786', PU and try to work through x3, no luck Rolled TF from HS to as drilled, RIH no issue 10/30/2018 1O 0/2018 4.40 PRODt DRILL DRLG P Ct 4784 psi, @ 1.82 bpm in, 1.76 bpm 9,365.0 9,765.0 10:30 14:54 out, Free spin diff 1219 psi, annular, 3838 psi, IA 703, Oa 797 psi CT WT 5 k lbs, WOB 1.58 k Ibs 10/30/2018 10/30/2018 0.30 PR001 DRILL WPRT P PU Wt 39 k His, Wiper trip #2 - 800' 9,765.0 8,958.0 14:54 15:12 10/30/2018 10/30/2018 0.30 PROD1 DRILL WPRT P RBIH, clean 8,958.0 9,765.0 15:12 15:30 10/30/2018 10/30/2016 4.00 PROD1 DRILL DRLG P Ct 4859 psi, @ 1.81 bpm in, 1.69 bpm 9,765.0 9,969.0 15:30 19:30 out, Free spin diff 1062 psi, annular, 3909 psi, WH 191, IA 707, OA 809 psi, CT WT 3 k lbs, WOB 1.1 k lbs - ROP 30 -100 ft/hr 10/30/2018 10/30/2018 0.60 1 PROD1 DRILL WPRT P Geo wiper, PUW=43K 9,969.0 9,969.0 19:30 20:116 10/30/2018 10/3672018 1.90 FROM DRILL DRLG P Drilling, 1.8 bpm, CWT = -1.5K, WOB 9,969.0 10,062.0 20:06 22:00 = 1.35K, BHP = 3902 psi, WHP = 162 psi, PU's to continue drilling, Avg ROP 49 fph Mud Swap to system #3, hit bit at 10,026' 10/30/2018 10/30/2018 1.50 PROD1 DRILL DRLG P Drilling, 1.8 bpm, CWT= 2K, WOB = 10,062.0 10,200.0 22:00 23:30 1.3K, BHP = 3890 psi, WHP = 306 psi, circ = 4768 psi, pump 5x5 sweeps, 03012016 10/31/2018 0.50 PROD1 DRILL WPRT P Begin wiper to window, PUW=40K 10,200.0 8,775.0 2 23::30 00:00 10/31/2018 10/31/2018 1.50 PROD1 DRILL WPRT P Continue wiper towindow, rate out 8,775.0 7,360.0 00:00 01:30 drops, packing off, RBIH, stack WOB at 8775', unable to move down or up, sit at just over PUW, pumpiing, allow pack -off to erode, pull free, silt -stone over shakers from lagged depth of 8775', slow down, pump 5x5 sweeps, circulate sweeps to surface. 10/31/2018 10/31/2018 0.10 PROD1 URFILL DLOG P Log RA for+4'correction 7,360.0 7,380.0 01:30 01:36 10/31/2018 10/31/2018 1.20 PROD1 DRILL WPRT P Wiper in-hole, ran through trouble7,380.0 10,200.0 01:36 02:48 interval 8750 - 8775' at min rate, saw 1.6K WOB at 8761', then fell off, RIW = 5K Page 11/39 ReportPrinted: 11/20/2018 : perations Summary (with Timelog ..pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log St Tme EMTme DxM poria opcoda AWrry Code tone P -r -x Dpwafm ��lh 0") EM Deps+(m(3) 10/31/2018 10/31/2018 2.20 PROD1 DRILL DRLG P Drilling, 1.8 bpm, FS = 1090 psi, CWT 10,200.0 10,356.0 02:48 05:00 = 2K, WOB = 1K, BHP = 3900 psi, WHP = 259 psi, circ = 4736 psi, PUW = 48K from 10,293', PUW = 54 from 10,331- 10/3112018 10/31/2018 4.80 PROD1 DRILL DRLG P Drilling, CWT= -0.5K, WOB=1K, 10,356.0 10,535.0 05:00 09:48 BHP =3949 psi, WHP=289 psi, circa = 4822 psi 10/31/2018 10/31/2018 3.20 PROD1 DRILL WPRT P Geo called TD@ 10535' 10,535.0 78.0 09:48 13:00 PU WT 40 k lbs - launch 10x10 TD sweeps, while PUH slowly. Increase to normal POOH rate and chase sweeps to surface. Time tow additional 5x5 sweeps for the trouble area @ 8700' and the build. Saw some motor work @ 8713', continued out of hole Lots of very small but fresh cavings at 2300 bit depth, surged well near surface, quite a bit of aluminum and some larger, more rounded rocks at the shaker. 10/3112018 10/31/2018 1.30 PROD1 DRILL TRIP P RBIH 398.0 7,080.0 13:00 14:18 10/31/2018 10/31/2018 0.20 PROD1 DRILL DLOG P Tie into K1 for -8.5' correcion. 7,080.0 7,163.0 14:18 14:30 10/31/2018 10/31/2018 0.20 PROD1 DRILL DLOG P Park @ 7326 09 CTMD, 5953.08' 7,163.0 7,326.0 14:30 14:42 TVD Trap 3763 psi 1 min 3683 psi 11.89 ppg 2 min 3632 psi 11.80 ppg 3 min 3632 psi 11.73 ppg 4 min 3612 psi 11.61 ppg 5 min 3588 psi 11.59 ppg 10/31/2018 10/31/2018 1.80 PROD1 DRILL TRIP P Continue to RIH, window, build, and 7,326.0 10,328.0 14:42 16:30 falut at 8700' clean 10/31/2018 10/31/2018 2.30 PROD? DRILL DISP P POOH displacing well to liner running 10,328.0 78.2 16:30 18:48 pill - 52 bbls top of pill 4400'. Painted Yellow flag 8478.4' 10/31/2018 10/31/2018 0.50 PROD1 DRILL OWFF 5 At surface, check well for flow (no- 78.2 78.2 18:48 19:18 flow), PJSM . 10/31/2018 10/31/2018 0.45 PROD1 DRILL PULD P LO drilling assembly on a dead well 78.2 0.0 19:18 19:45 10/31/2018 10/31/2018 0.30 PROD1 DRILL OTHR P Perform Function test on BOP stack. 78.2 19:45 20:03 (good test), LD test joint 10/31/2018 10/31/2018 0.40 COMPZ1 CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0 20:03 2027 10/31/2018 10/31/2018 2.75 COMPZI CASING PUTB P PU 55 joints of slotted liner with non- 0.0 1,840.7 20:27 23:12 ported bullnose and shorty deployment sleeve. 10/31/2018 10/31/2018 0.25 COMPZ1 CASING PUTB P RD liner running equipment 1,840.7 1,840.7 23:12 23:27 10/31/2018 1111/2018 0.55 COMM CASING PULD P PJSM, PU1MU CoilTrak tools, 1,840.7 1,884.9 23:27 00:00 (hanging dg hook -load 21.49 k), spaceout, close 2-3/8" on tool string, bring cart forward 11!112618 11/1/2018 0.45 COMPZI CASING PULD P Swap out float valves in UQC, stab 1,884.9 1,884.9 00:00 00:27 INJH, surface test BHI CoilTrak tools (good -test), function open rams, tag up, reset counters 11/1/2018 11/1/2018 1.44 COMPZI CASING RUNL P RIH w/liner segment#1 1,884.9 7,296.1 00:27 01:53 Page 12139 ReportPrinted: 11120/2018 _perations Summary (with Timelog ..pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SWUM Eq rens DW(M MUG op code AC&4Cade rico P -T -x operation StMDepol (IOa3) ErW DWM(WJ3) 11/1/2018 11/1/2018 0.10 COMPZI CASING RUNL P Correct to the EOP flag minus 11.0', 7,296.1 7,296.1 01:53 01:59 PUW 11/1/2018 11/1/2018 0.30 COMPZ1 CASING RUNL P Continue RIH 7,296.1 8,166.0 01:59 02:17 11/1/2018 11/1/2018 1.75 COMPZI CASING RUNL P Start working liner towardsboltom, 8,166.0 9,960.0 02:17 04:02 PUW's 4550k 11/1/2018 11/1/2018 0.20 COMPZI CASING RUNL P Continue RIH to bottom 9,960.0 10,347.0 04:02 04:14 11/1/2018 11/1/2018 2.00 COMPZI CASING TRIP P Off bottom, PUW 34 k, remove liner 10,347.0 58.0 04:14 06:14 length from depth, lined up across the top, POOH 11/1/2018 11!1/2018 0.60 COMPZI CASING PULD P Crew change, PJSM, bump up, flow 58.0 0.0 06:14 06:50 check, LD BHA#8, IowefAL1 completion running assembly. 11/1/2018 11/1/2018 0.40 COMPZ1 CASING PUTB P Prep floor to run liner 58.0 0.0 06:50 07:14 11/1/2018 11/1/2018 0.50 COMPZI CASING SVRG P Lock out comy to repair hydralic weep 0.0 0.0 07:14 07:44 on HCR - B8, (recently replaced) 11/1/2018 11/1/2018 1.20 COMPZI CASING PUTB P Pickup and run 19joints under an 0.0 763.7 07:44 08:56 anchored billet. (763.69' LOA) 11/1/2018 11/1/2018 0.90 COMPZI CASING PUTB P PU BHA# 9,Upper completion 763.7 837.1 08:56 09:50 running assembly. 11/1/2018 11/1/2018 1.60 COMPZI CASING RUNL P RIH, Tie.into the windowflag fora -8.9' 837.1 8,062.0 09:50 11:26 correction, Close EDC. PU Wt 351k lbs @ 7226' Encounter sharp WOB increase as bull nose approached the billet @ 7745'. Stack 10 k WOB @ 7877', slow running speed from 26 ft/min to 17 lt/min Stack 10.9 k WOB again at 8,062 bit depth, PU Wt 37 k lbs 11/1/2018 11/1/2018 1.60 COMPZI CASING PULL T PUH, park, open EDC, POOH, update 8,062.0 844.0 11:26 13:02 window flag depth to account for planed BHA change. 11/1/2018 11/1/2018 0.80 COMPZI CASING PULD T Bump up, flow check, 0.4 bbls to fill 844.0 809.1 13:02 13:50 stack, LD liner running tools. 11/1/2018 11/1/2018 0.90 COMPZI CASING PULD T MU BHA #10, (drop off HOT, pick up 809.1 809.1 13:50. 14:44 GS and make up shorty to liner) 11/1/2018 17/1/2018 1.80 COMPZI CASING RUNL T Bump up, set counters, RIH, 809.1 8,506.7 14:44 16:32 PU Wt 35 k lbs @ 7209', WOB -3 on pick up. RIH widow, billet clean, S/D 8506' PU Wt 36 k lbs, RBIH, SID 8506.6'& 4.2 k WOB Pump 1.5 bpm, only built 104 psi diff, S/D , discuss, pump 1.7 bpm, max safe for BHP, built 3576 psi on CT and 127 psi diff 11/1/2018 11/1/2018 2.00 COMPZI CASING TRIP T PU, WOB -2.2klbs POOH with ALI 8,506.7 809.1 16:32 18:32 upper completion. Suspect EDC has failed. Park at 6864', cycle EDC open then closed, 11/1/2018 11/1/2018 0.45 COMPZI CASING PULD T At surface, check well for flow, unstab 809.1 764.9 18:32 18:59 INJH, MU test plate to end of coil, PT 4,100 psi (good -test), move cart back, continue inspecting CDiltrak Tools, found EDC failure, PJSM for contengencies while swapping out tools, 11/1018 11/1/2018 0.50 COMPZI CASING PULD T Swap out upper section, 764.9 764.9 18:59 9 19:29 Page 13139 Report Printed: 11120120181 _ aerations Summary (with TimelOg L pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SWTMS rsa Toe av(n4 ros=e opOoae naway cafe rarer -r -x opar, em SWI Depth (wok EnaDepth PSI 11/1/2018 1111/2018 0.25 COMPZI CASING PULD T Move cart forward, MU Coil, perform 764.9 809.1 1929 19:44 1 surface test (good -test) 11/1/2018 11/1/2018 0.10 COMPZ1 CASING PULD T Stab on INJH, tag up reset counters, 809.1 809.1 19:44 19:50 -1 RIH w1BHA#11 11/1/2018 11/1/2o18 o0 COMPZI CASING RUNL T RIH, w/19 Its of slotted liner, ported 809.1 7,222.0 19:50 20:50 bullnose, and shorty deployment sleeve, BHA#11 linersegment#2 11/1/2018 11/1/2018 0.15 COMPZI CASING RUNL T Correct to the EOP flag plus 16.0', 7,222.0 7,222.0 20:50 20:59 1 PUW 35 k, minus 4.4 k DHWOB 11/1/2018 11/112018 0.20 COMPZI CASING RUNL T Continue IH 7,222.0 7,830.0 20:59 21:11 11/1/2018 1111/2018 0.40 COMPZ1 CASING RUNL T Log the Ki for depth control, minus 7,830.0 7,830.0 21:11 21:35 25' (minus 9.0') 11/1/2018 11/1/2018 0.25 COMPZI CASING RUNL T Continue RIH 7,830.0 8,506.0 21:35 21:50 11/1/2018 11/1/2018 0.15 COMPZ1 CASING RUNL P Set down, 2.3 k, PUW 37 k, set back 8,506.0 7,730.0 21:50 21:59 down, 3.5 k, bring pump up to 1.4 bpm at 3,953 psi, 1,099 psi diff, PUW 32 k minus 2.2 DH WOB, liner released, park at remove liner length from counter depths 11/1/2018 11/1/2018 1.50 COMPZI CASING TRIP P POOH, pumping min rate down the 7,730.0 44.2 21:59 23:29 coil, PJSM Q 2,500' 11/1/2018 11/2/2018 0.51 COMPZ1 CASING PULD P At surface, check well for flow, LD 44.2 0.0 23:29 00:00 setting tools BHA#10 11/2/2018 11/212018 0.75 COMPZI CASING PULD P PU/MU OH Anchored Billet, MU 0.0 73.4 00:00 00:45 ColliTrak tools, MU UQC, surface test tools (good -test), stab and MU INJH, tag up, reset counter depths 11/212018 11/2/2018 1.20 COMPZI CASING TRIP P RIH, with OH Anchored Billet (open- 73.4 7,095.0 00:45 01:57 EDC), pumping min rate 0.35 bpm at 356 psi 11/2/2018 111212018 0.30 COMPZI CASING DLOG. P Log the K1 marker correction of minus 7,095.0 7,121.0 01:57 02:15 7.5', close EDC, PUW 35 k 11/2/2018 11/212018 0.20 COMPZI CASING TRIP P Continue IH 7,121.0 7,741.0 02:15 02:27 11/2/2018 1112/2018 0.20 COMPZI CASING WPST P Set down 2.2 k DHWOB, PUH to 7,741.0 7,730.0 02:27 02:39 neutral weight, bring pump up at 0.5 bpm up to shear 2,600 psi, PUW 38 k 11/2/2018 11/2/2018 1.50 COMPZ1 CASING TRIP P POOH, pumping 0.72 bpm at 1,127 7,730.0 44.2 02:39 04:09 psi, PJSM Q 500' from surface 11/2/2018 11/2/2018 0.50 COMPZI CASING PULD P At surface, LD setting tools on a dead 44.2 0.0 04:09 04:39 1 well. 11/2/2018 11/2/2018 1.00 PROD2 STK PULD P PU BHA# 13, AL1 -01 drilling 0.0 78.2 04:39 05:39 assembly, 0.7" AKO w HYC A2 bit, bump up, set counters. 11/212018 1112/2018 1.00 PROD2 STK TRIP P RIH, 78.2 7,091.0 05:39 06:39 11/2/2018 11/212018 0.20 PROD2 STK DLOG P Tie into the K1 marker for -8' 7,091.0 7,122.0 06:39 06:51 correction 11/2/2018 1112/2018 1.40 PROD2 STK DISP P Continue to RIH 7,122.0 7,730.0 06:51 08:15 Tag TOB @ 7730.4', PUH while displacing drilling mud to surface. 11/212018 1112/2018 1.50 PROD2 STK KOST P Time mill off billet 7,730.0 7,732.2 08:15 09:45 CT 4305 psi @ 1.80 bpm in 1.80 bpm out, free pinn 1075 psi, CT WT 16.7 k lbs, WOB 0.4 k lbs WH 275 psi IA 694 psi, OA 719 psi. 11/2/2018 11/212018 0.60 PROD2 STK KOST P Start targeting 0.5 k WOB, step up to 7,732.2 7,740.8 09:45 10:21 1 I 5, 10 and 15 ft,hr Page 14/39 ReportPrinted: 11/20/2018 Summary (with Timelog , pths) 3H -13A lipperations Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SWTme End now or(hr) pta Op Code ACMyCale Time P -T -X OpereHon Stell OEpT (Mra) End Depth (MB) 11/2/2018 11/2/2018 0.80 PROD2 DRILL DRLG P Drilling ahead 7,740.8 7,792.0 10:21 11:09 Ct Wt 13 k Ibs, WOB 2 k lbs, ROP 100 11/hr Drill to 7790', PU Wt 41 k bs, PUH, slight over pull at bilet, 0.8 k lbs WOB RBIH, dirty drift, billet clean 11/2/2018 11/2/2018 0.80 PROD2 DRILL DRLG P OBD 7,792.0 7,891.0 11:09 11:57 CT Wt 13.6 k Ibs, WOB1.6 k Ibs, ROP 200 ftlhr 11/2/2018 11/212018 0.40 PROD2 DRILL WPRT P PU for DD wipers, dirty surveys and 7,891.0 7,891.0 11:57 12:21 threading the needle betwen AL1, P81. Disscussed w town, PUH and shot checkshot above billet. RBIH 11/2/2018 11/2/2018 1.00 PROD2 DRILL DRLG 15 CT 4451 psi, @ 1.81 bpm in, 1.80 7,891.0 8,046.0 12:21 13:21 bpm out, free spin diff 1205 psi, annular 3731 psi. CT 12.8 k Ibs, WOB 2.1 k Ibs, ROP 200 f/hr Average ROP over interval 155 11/2/2018 11/2/2018 0.80 PROD2 DRILL DRLG P Having dificully getting turned down 8,046.0 8,074.0 13:21 14:09 PU 44 k lbs, RBIH slowliy PU 39k lbs, RBIH slowly Time drill 11/2/2018 11/2/2018 1.70 PROD2 DRILL DRLG P PU Wt 38 k lbs, adjust rate back to 1.8 8,074.0 8,300.0 14:09 15:51 CT 4435 psi, 1.79 bpm in, 1.79 bpm out, free spin 1181 psi, annular 3747 psi, WH 188 psi, IA 697, OA 760 CT 8.4 k lbs, WOB 2.4 k lbs, ROP 200 Mr. 11/2/2018 11/2/2018 0.20 PROD2 DRILL WPRT P PU, 41 k Ibs -1 MOB coming off 8,300.0 7,764.0 15:51 16:03 bottom slight negWOB overpulls (ria 7928, and 7780' 11/2/2018 11/2/2018 0.20 PROD2 DRILL WPRT P RBIH 7,764.0 8,300.0 16:03 16:15 S/D @ 7764' and 7776' reduce pump rate and RIH 11/2/2018 11/2/2018 1.20 PROD2 DRILL DRLG P CT 4435 psi, 1.79 bpm in, 1.79 bpm 8,300.0 8,529.0 16:15 17:27 out, free spin 1193 psi, annular 3747 psi, WH 180 psi, IA 699, OA 780 CT 8.4 k lbs, WOB 2.4 k lbs, ROP 200 ft(hr. PU Wt 37 k lbs, adjust rale to 1.9 CT 4704 psi, 1.90 bpm in, 1.90 bpm out, free spin 1298 psi, annular 3732 psi, WH 150 psi CT 8.6 k lbs, WOB 2.2 k Ibs, ROP 200 Whir. 11/2/2016 11/2/2018 1.60 PROD2 DRILL DRLG P OBD @ 228 fph, 1.9 bpm at 5,206 psi, 8,529.0 8,700.0 17:27 19:03 Diff --1,315 psi, WHP=36, BHP=3,605, IA=701, OA=800 11/2/2018 11/2/2018 0.50 PROD2 TRILL WPRT P wiper up hole with sweeps, PUW 35 k 8,700.0 7,760.0 19:03 19:33 11/2/2018 11/2!2018 0.45 PROD2 DRILL WPRT P Wiper back in hole, RIW 16 k 7,760.0 8,700.0 19:33 20:00 11/2/2018 11/2/2018 2.30 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 3,796 psi, 8,700.0 9,101.0 20:00 22:18 Diff --1,325 psi, WHP=166, BHP=3,809, IA=702, OA=806 11/2/2018 11/22018 1.10 PROD2 DRILL WPRT P Wiper up hole, PUW 39 k 9,101.0 7,360.0 22:18 23:24 11/2/2018 11/22018 0.20 PROM DRILL DLOG P Log RA marker correction of plus 2.0' 7,360.0 7,362.0 23:24 23:36 Page 15/39 ReportPrinted: 11/20/2018 Aerations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stall Time EndTM Dur(hr) Phase Cp Code Ac" Code Tore P -T -X Operation Start Depth (WB) End DepM OW) 11/2/2018 11/3/2018 0.40 PROD2 DRILL WPRT P Wiper back in hole, RIW 10 k 7,362.0 8,823.0 23:36 00:00 11/3/2018 11/3/2018 0.15 PROD2 DRILL WPRT P Continue wiper in hole, RIW 10 k 8,823.0 9,101.0 00:00 00:09 11/3/2018 11/3/2018 1.00 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 4,977 psi, 9,101.0 9,241.0 00:09 01:09 Diff -1,360 psi, WHP=164, BHP=3,820, IA=700, OA=811 11/3/2018 11/3/2018 0.10 PROD2 DRILL WPRT P BHA Wiper PUW 45 k 9,241.0 9,241.0 01:09 01:15 11/3/2018 11/3/2018 1.75 PROD2 DRILL DRLG P BOBD, 1.9 bpm at 5,109 psi, 9,241.0 9,455.0 01:15 03:00 Diff -1.367 psi, WHP=227, BHP=3,849, IA=701, OA=819 Note: New Mud at the bit 9,394' 11/3/2018 11/3/2018 0.34 PROD2 DRILL DRLG P PUH, obtain drilling parameters, 9,455.0 9,500.0 03:00 03:20 BOBD, 1.9 bpm at 4,698 psi, Diff -1,349, WHP=340, BHP=3,830, IA=696, OA=804 11/3/2018 11/3/2018 0.45 PROD2 DRILL WPRT P Wiper up hole 1000', PUW 39 k 9,500.0 8,500.0 03:20 03:47 11/3/2018 11/3/2018 0.40 PROD2 DRILL WPRT P Wiper back in hole, RIW 8,500.0 9,500.6- 03:47 04:11 11/3/2018 11/3/2018 1.90 PROD2 DRILL_ DRLG P BOBD, 1.9 bpm at 4,489 psi, 9,500.0 9,773.0 04:11 06:05 Diff --1,130, WHP=387, BHP=3,846, IA=694, OA=771 Average ROP over interval 143 ft/hr 11/3/2018 11/3/2018 0.45 PROD2 DRILL WPRT P PU wt 42 k, crew change pick up, 9,773.0 9,773.0 06:05 06:32 1 00'wiper, RBIH Wt 8.9 k lbs 11/3/2018 11/3/2018 0.60 PROD2 DRILL DRLG P CT 4650 psi @ 1.88 bpm in, 1.80 bpm 9,773.0 9,900.0 06:32 07:08 out, Free spin diff 1211 psi, Annular 3875 psi, 11.8 ppg @ the window WH 335 psi, IA 694 psi, OA 755 psi BOBD, CT Wt 0 k lbs, WOB 1.34 k Ibs, ROP 100-200 ft/hr Average ROP over interval ff/hr 211 11/3/2018 11/3/2018 0.40 PROD2 DRILL WPRT P PU Wt 44 kwiper #2 9,900.0 8,896.0 07:08 07:32 11/3/2018 11/3/2018 0.40 PROD2 DRILL WPRT P RBIH Ct Wt 8,896.0 9,900.0 07:32 07:56 11/3/2018 11/3/2018 0.90 PROD2 DRILL DRLG P OBD 9,900.0 10,018.0 07:56 08:50 CT 5025 psi @ 1.88 bpm Free spin diff 1202 psi, CT Wt -1 k Ibs, WOB 1. k lbs, ROP 100-200 ft/hr Average ROP over interval ft/hr 131 11/3/2018 11/3/2018 0.40 PROD2 DRILL DRLG P DD having issue building angle, PU 10,018.0 10,068.0 08:50 09:14 and restart with lower pump rate, 1.53 bpm CT 5025 psi @ 1.88 bpm Free spin diff 1202 psi, CT Wt -1 k Ibs, WOB 1. k Its, ROP 100-200 ft/hr Average ROP over interval ft/hr 125 11/3/2018 11/3/2018 0.80 PROD2 DRILL DRLG P Built angle. to 88', PU 40 k lbs, 10,068.0 10,137.0 09:14 10:02 increase rate back to 1.9 CT 4878 psi, @ 1.88 bpm in, 1.86 bpm out, Annular 3898 psi, WH 271 psi, IA 695 psi, OA 776 psi CT Wt -4.8 k lbs, WOB 1 k Ibs, ROP 150 f imin PU 10081, 44 k Ibs Average ROP over interval fUhr 86 Page 16/39 Report Printed: 11/2 012 01 8 • ,aerations Summary (with Timelog . )ths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Shit Thee End lire or (M Phase op Code Ac" Code Time P -T -x opmetim start Depth (MB) End Depth() 11/32018 11/3/2018 1.70 PROD2 DRILL DRLG P Sudden dop in ROP @ 10137', drilling 10,137.0 10,265.0 10:02 11:44 break @ 10,140' CT 4878 psi, @ 1.88 bpm in, 1.86 bpm out, Annular 3898 psi, WH 271 psi, 1A 695 psi, OA 776 psi CT Wt -4.8 k lbs, WOB 1 k lbs, ROP 8 - 150 ft/min PU's 10081, 44 k lbs 10138 48 k 10169 42 k 10185 43 k 10204 43 k 10230 46 k 10247 46k Pump 5x5, Average ROP over interval R/hr 75 11/3/2018 11/3/2018 1.00 PROD2 DRILL WPRT P PU Wt 46 kwiper #3 10,265.0 7,360.0 11:44 12:44 Hole and billet des on trip out of hole, returned 0.5 bible solids 11/3/2018 11/3/2018 0.10 PROD2 DRILL DLOG P Tie into the RA tag for a +4' correction 7,360.0 7,381.0 12:44 12:50 11/3/2018 11/32018 1.86 PROD2 DRILL WPRT P Wiper back in hole, RIW 7,381.0 10,266.0 12:50 14:38 billet clean, Stack WOB to 4 k x4, PU's to -2 k lbs WOB from 8340-8390' Orient TF to as drilled, pump to min rate, and lower RIH speed to 30 ft/min, slid through. Hole otherwise clean to bottom. While increasing rate to 1.9 bpm, experienced 2 annular pressure events and pulled heavy 48 k lbs , packing off. Launched 5x5 sweep pulled up hole slowly pumping 1.9 bpm, pressures back to normal. lower pump rate to 1.7 bpm and attempt to RIH, no luck 11/32018 11/312018 0.40 PROD2 DRILL WPRT P PUH on 500' wiper while adding low 10,266.0 10,266.0 14:38 15:02 torqu to high and low vis pit pits as well as Alpine beads to Hi Vs Tum around @ 9776' RBIH 11/3/2018 11/32016 2.96 PROD2 DRILL DRLG P CT 4345 psi, @ 1.70 bpm in, 1.70 10,266.0 10,421.0 15:02 18:00 bpm out, Annular 3913 psi, WH 311 psi, IA IA 698, OA 789 CT Wt -4.9 k lbs, WOB 1.76 k lbs, PPU @ 10297', 52 k Itis Pumping sweeps 5x5 w beads in the hi -vis 11/3/2018 11/32018 4.20 PROM DRILL DRLG P Continue Drilling ahead with beaded 10,421.0 10,696.0 18:00 22:12 sweeps, 1.9 bpm at 4,420 psi, Diff --1,152 psi, WHP=244, BHP=3,938, IA=700, OA=813, PU's 35-45 k 11/3/2018 11/4/2018 1.80 PROD2 DRILL WPRT P TDALl-01 Lateral, PUH 35 k, heistate 10,696.0 7,316.0 22:12 00:00 for sweeps to exit bit, POOH, launch and time out sweeps @ EOB and window, continue Wiper to the swab valve. 11/4/2018 11/4/2018 1.50 PROD2 DRILL WPRT P Continue wiper to the swab valve, 7,316.0 78.3 00:00 01:30 pumping 1.83 bpm at 4,725 psi, perform jog @ 1,071'- 1,453', recovered some carvings across shaker, retrieve sample and upload picture to s:ddve, continue wiper to surface Page 17/39 Report Printed: 1 112 012 01 8 • aerations Summary (with Timelog , aths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Time End Tire DIN 00 PM" op Code I A-MyCode Time P -T -X Operation stat Depth (81®) End D" (WB) 11/4/2018 11/4/2018 0.20 PROD2 DRILL WPRT P Tag up at surface, reset counter 78.3 78.3 01:30 01:42 depths 11/412018 11/4/2018 0.20 PROD2 DRILL TRIP P —Daylight savings— 78.3 7,095.0 01:42 01:54 —o RIH to confirm TD 11/4/2018 11/4/2018 20 PR552 DRILL DLOG P Log the K1 correction of minus 9.5', 7,095.0 7,316.0 01:54 02:06 PUW 11/4/2018 11/4/2018 0.20 PR5D2 DRILL CTOP P Perform Pressure Survey, Shutdown 7,316.0 7,316.0 02:06 02:18 mud pump, close choke 71' RKB to Sea Lvl 11.6 ppg ECD 3,595 psi Press Sensor (TVD) 5,947.88- 11/412018 11/4/2018 2.20 PROD2 DRILL WPRT T Continue IH, started taking CT weight 7,316.0 10,420.0 02:18 04:30 @ 8,392'(4k bobble) no pickup, continued IH, 9,045' set down, noticed packing off and pulling heavy (52k), worked pipe, continued back up hole to 8,000', RBIH, fairly clean toward bottom, struggling to get back to bottom @ 10,420', pull wiper to the window. 11/4/2018 11/4/2018 2.20 PROD2 DRILL WPRT T Pull wiper to the window, PUW 45 k 10,420.0 7,360.0 04:30 06:42 Up down passes @ 10,286, 10135, 10107' -1 k WOB bobble @ 8348' 11/4/2018 11/4/2018 0.20 PROD2 DRILL DLOG T Tie int oth RA tag for +2' correcion 7,360.0 7,396.0 06:42 06:54 11/4/2018 11/4/2018 1.00 PROD2 DRILL TRIP T RBIH to confirm TD and lay in liner 7,396.0 9,720.0 06:54 07:54 running pill Encounter motor work in multiple spots, 8375, 9030, 9451, 9720' SID multiple times 9720', varied pump rate, running speed, and TF, PU's 45 k lbs fine fresh cavings and lots of fine cuttings at the shaker, looks like we are drilling ahead at – 120 filhr 11/4/2018 11/4/2018 1.80 PROD2 DRILL WPRT T Consult w engineering on path 9,720.0 7,280.0 07:54 09:42 forward, Roll into clean out mode, transfer liner running pill back to pit 6 KW and build 50 bbl's each to and hi vis, hi vis out of active mud to allow room for expected returns at surface. While building sweeps, PUH slowly, minor pack o8 events @ 9200, 9075, 9891', 8364' and pulled heavy at 8344' RBIH, 3 k WOB, PU, 35 k lbs, PUH Billet and window clean. "'•additional 1.4 bbl's of cuttings returned since RBIH post swab wiper 11!4/2018 11/4/2018 1.60 PROD2 DRILL WPRT T Pump 5x5, chase to surface while 7,280.0 7,097.0 09:42 11:18 jogging coil from 6559 to 7275'. Some large rocks and a large amount of fine cavings returned to the shaker. Steady state of cavings that had been returning diminished significantly. Pumped additional 5x5, greatly diminished amount of large rocks, only a couple versus 100's. 11/4/2018 11/4/2018 0.20 PROD2 DRILL DLOG T Tie into the Kt for a+3' correction. 7,097.0 7,112.2 11:18 1130 Page 18139 Report Printed: 11/20/2018 perations Summary (with Timelog . pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SWTM EWTme SWM Pham Op Code A .ty Code Tkne P -T -X Operation Slat Depth QKB) End Depth OK13) 11/4/2016 11/4/2018 1.40 PROD2 DRILL WPRT T RIH, window and build clean, pumping 7,112.2 10,699.0 11:30 12:54 1 bpm and running 50 ft/min. Some motor work @ 7776', 9432', and SID @ 10,290'. PU 40 it lbs. 11/4/2018 11/4/2018 0.30 PROD2 DRILL WPRT T PU, 38 k lbs, Stage pump to 1.9 bpm, 10,699.0 10,630.0 12:64 13:12 POOH slowly at rate chasing sweep out of open hole. Three annular pressure spikes with a sligh drop in out rate 38 bbls pumped. 11/4/2018 11/4/2018 1.00 PROD2 DRILL WPRT T Increase pulling speed to 50 ft/min, 10,630.0 7,863.0 13:12 14:12 POOH Stage sweeps for build and the window. neg WOB over pulls @ 9461' and 8377' with annular pressure spikes. 11/4/2018 11/4/2018 0.80 PROD2 DRILL WPRT T Baker coil trac tools lost power, slow 7,863.0 7,718.0 14:12 15:00 pulling speed to 3 ftfmin. Sweeps exiting early, Started to pack off and pull heavy @ 7779' Attempt to RIH, setting down at 7755' Pulling up to 50 it @ 7746. Work pipe, returns fluctuating. Pull past billet, full returns 11/4/2018 11/4/2018 0.80 PROD2 DRILL WPRT T Pull through build blind. No over pull 7,718.0 7,718.0 15:00 15:48 on CT Wt. Sweeps from the billet landed with a few rocks, mostly small cavings. Pumped 4 sweeps in cased hole, third and fourth clean. 11/4/2018 11/4/2018 2.75 PROD2 DRILL WPRT T POOH, to surface without comms to 7,718.0 78.2 15:48 18:33 BHA 11/4/2018 11/4/2018 1.00 PROD2 DRILL PULD T Al surface, PUD failed drilling BHA 78.2 0.0 18:33 19:33 #13, unstab INJH, test edine (good - test), slide cart back, hooked up test cable to BHA test tools (bad -test), continue PUD 11/4/2018 11/4/2018 1.15 PROD2 DRILL PULD T PD cleanout _BHA #14 0.0 68.4 19:33 20:42 11/4/2018 11/4/2018 1.25 PROD2 DRILL TRIP T Tag up, reset counters, RIH w/BHA 68.4 7,090.0 20:42 21:57 #14 cleanout assembly with D331 and agitator. 91/4/2o18 11/4/2018 0.20 PROD2 DRILL DLOG T Log the K1 marker correction of minus 7,090.0 7,124.0 21:57 22:09 1 8.5' *** Note: End of BHI DT 11/4/2018 11/4/2018 0.45 PROD2 DRILL TRIP T Continue RIH thru window, timeout 7,124.0 7,900.0 22:09 22:36 5x5 sweep, *— Note: 7,733-7,776' notice +2.2 k DHWOB 11/4/2018 11/4/2018 1.00 PROD2 DRILL WPRT T Pull wiper up to the tubing, PUW 36 k, 7,900.0 5,500.0 22:36 23:36 notice *** Note: Minus 6.0 k pull @ 7,730' as DTF 11/412018 11/5/2018 0.40 PROD2 DRILL TRIP T Continue trip back in hole, RIW 14 k 5,500.0 7,646.0 23:36 00:00 11/5/2018 11/5/2018 0.55 PROD2 DRILL TRIP T Continue trip back in hole Teen, RIW 7,646.0 9,000.0 00:00 00:33 14 k 11/5/2018 11/5/2018 1.00 PROD2 DRILL WPRT T Wiper up hole into the tubing, PUW 38 9,000.0 5,800.0 00:33 01:33 . k, 7,763' minus 1.0 k, 8,983' minus 2.5 k Page 19/39 ReportPrinted: 11120120181 an aerations Summary (with Timelog . pths) 3H -13A ..,.. Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Cog Slav Tile rya TYrc Oir(ix) {Tess OP CoOe Acivny Cotle 1Ma P -T -x Cppaim sun Dgnh (11103) End DRIh(fif0) 11/5/2018 11/5/2018 0.25 PROD2 DRILL TRIP T RBIH 5,800.0 7,090.0 01:33 01:48 11/5/2018 11/5/2018 0.10 PROD2 DRILL DLOG T Log the K1 marker correction of plus 7,090.0 7,110.0 01:48 01:54 2.5' 11/5/2018 11/5/2018 1.70 PROD2 DRILL TRIP T Continue trip in hole, RIW 14 k, 7,730' 7,110.0 10,699.0 01:54 03:36 0.9 k, 9,450' 0.3 k, 10,251' 1.0 k, 10,400' 0.6 k, 10,470' setdown, PUH 38 k, RBIH, confirm TD 10,699', pump 1 0x1 0 sweep 11/5/2018 11/5/2018 1.80 PROD2 DRILL WPRT T PUH slowly notice annular pressure 10,699.0 10,465.0 03:36 05:24 swings, slowly work coil up hole, 10,465' pull heavy, turn around and are unable to move pipe, returns slowly deminished to zero. Countinue to work pipe to establish returns. 11/5/2018 11/5/2018 7.10 PROD2 DRILL CTOP T Circulate 14.7 bbl of LVT down coil, let 10,465.0 10,465.0 05:24 12:30 soak, work pipe staging CT Wt up to 86 k lbs, and -16 k lbs. Alempted various pump rates and dumped choke while pulling max. 11/5/2018 11/5/2018 3.50 PROD2 DRILL CTOP T Build 10 bbl 100 k LSRV Hi -vis pill, 10,465.0 10,465.0 12:30 16:00 displace down coil to open hole. Let sit static 1 hr. Open EDC. Stage pumps to 3 bpm, reduce WH to - 350 psi, no circulation. Diconnect from BHA, pump up to 2 bpm, cyle pipe to 80 k - 15 k lbs. no movement CT depth 10461.6 to 10444.8" 11/5/2018 11/5/2018 2.00 PROD2 DRILL CTOP T Trapped WH of 660 psi, slowly falling, 10,465.0 10,465.0 16:00 18:00 11/5/2018 11/5/2018 1.40 PROD2 DRILL CTOP T Make up and confirm kill fluid is up to 10,465.0 10,465.0 18:00 19:24 weight 11.8 ppg, with added lubes 42 bbl, confirm 100 bbls of kill fluid without 11/5/2018 11/5/2018 0.65 PROD2 DRILL CTOP T Work pipe, unsuccessful 10,465.0 10,465.0 19:24 20:03 11/5/2018 11/5/2018 1.00 PROD2 DRILL CTOP T Pump kill 11.8 ppg kill fluid down back 10,465.0 10,465.0 20:03 21:03 side. 1,800slow/ si p y dropping to 992 psi (65 bbis) 11/5/2018 11/5/2018 1.50 PROD2 DRILL CTOP T Pump additional 5 bbis while working 10,465.0 10,465.0 21:03 22:33 pipe -10k -+95k 11/5/2018 11/5/2018 0.50 PR552 DRILL CTOP T Circulate 11.8 ppg tubed kill weight 10,465.0 10,465.0 22:33 23:03 fluid down the coil Q 1.5 bpm 11/5/2018 11/5/2018 0.75 PROD2 DRILL CTOP T Mondor well for Now, work pipe twice 10,465.0 10,465.0 23:03 23:48 with no success. 11/5/2018 11/6/2018 0.20 PROD2 DRILL CTOP T Open 1x2 on pump in sub on RF, 10,465.0 10,465.0 23:48 00:00 monitor well for flow. 11/6/2018 11/6/2018 1.00 PROD2 DRILL CTOP T Fill hole, loss rate 1.2 bbis every hour. 10,465.0 10,465.0 00:00 01:00 SLB on location with hot -tap, run hand thm rig orientation. PJSM 11/6/2016 11/6/2018 0.40 PROD2 DRILL CTOP T PJSM with dg crew on pipe recovery, 10,465.0 10,465.0 01:00 01:24 no flow at surface 11/6/2018 11/6/2018 0.25 PROD2 DRILL CTOP T 41 k, (no flow) function closed Upper 10,465.0 10,465.0 01:24 01:39 and Lower 2 inch rams, manually lock rams. 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T line up and blow down riser to the pit 10,465.0 10,465.0 01:39 02:09 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T Install pipe slips, dog collar, and dog 10,465.0 10,465.0 02:09 02:39 collar, secure coil at stump 11/6/2018 11/6/2018 1.40 PROD2 DRILL CTOP T PJSM, (no -flow), install hot -tap, drill 10,465.0 10,465.0 02:39 04:03 hole into coil, monitor flow inside coil, fluiid appears to be high -vis Page 20139 ReportPrinted: 11/20/2018 Summary (with Timelog . pths) 3H -13A lipAerations Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log swtarre End Tire draa) Phase op Cone AcWftyCode rmreP-T.xCpemtlan SW Depen (N®) End oepM(N®) 11/6/2018 11/6/2018 1.50 PROD2 DRILL CTOP T Remove hot -tap, cut coil above 87" 10,465.0 10,465.0 04:03 05:33 from rig floor, install e -line clamp. trim coil to obtain 20' of slack e -line. 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T Install coil clamp, clean and organize 10,465.0 10,465.0 05:33 06:03 RF for changeout 11/6/2018 11/6/2018 6.40 PROD2 DRILL CTOP T Complete change out, discuss path 10,465.0 10,465.0 06:03 12:27 forward, lockout and cut wire at injector, install T bar, take control of wire at stump, Pull tension, remove lower wire clamp, cut additional tubing to allow space for roll bar to clear while skidding cart. "' note 80" max coil length to clear lower wire grab. Reattach lower wire clamp, skid cart and start installing spoolable connector on injector side of pipe. Install Tiber clamp to wire, RON (30 ton strain gauge) n tugger limited to 5k lbs. Pull tension on e -line, working up in 300 Ib increments up to 2700 lbs on the RON, confer with town engineer to pull over working limit of cable (2700 lbs), and cable releases at 2950 lbs after-20o'slack pulled from coil. Hanging weight of cable after release = 1000 lbs indicating that the cable released at the anchor. "147.3' of slack pulled"` *'Loss rate = 1 bbl/hr" 11/6/2018 11/612018 1.00 PROD2 DRILL CTOP T SLB e -line on location, discuss plan 10,465.0 10,465.0 1227 1327 forward, conduct rig orientation and PJSM 11/6/2018 1116/2018 1.50 PROD2 DRILL CTOP T Spot e -line unit outside rig and R/U 10,465.0 10,465.0 13:27 14:57 equipment to spool CDR3's e -line onto SLB's empty drum 11/612018 11/6/2018 1.75 PROD2 DRILL CTOP T Begin pulling e-Ime cable out of hole, 10,465.0 10,465.0 14:57 16:42 slow down and pull by hand -500 ft from surface 11/6/2018 11/6/2018 1.00 PROD2 DRILL CTOP T E -line and anchor out of hole, R/D e- 10,465.0 10,465.0 16:42 17:42 line, top off inside of coil with KWF, R/U scaffold 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T Fill coil w/11.8 ppg KWF 10,465.0 10,465.0 17:42 18:12 11/6/2018 11/6/2018 0.50 PROD2 DRILL CTOP T PJSM, with rig and SLB craws 10,465.0 10,465.0 18:12 18:42 11/6/2018 11/6/2018 0.40 PROD2 DRILL CTOP T Spot SLB e -line unit and whale next to 10,465.0 10,465.0 18:42 19:06 rig while installing BOT 5 -pitch CTC and pull test 25 k 11/6/2018 11/6/2018 3.00 PROD2 DRILL CTOP T RU B-line, 10,465.0 10,465.0 19:06 22:06 11/6/2018 11/612018 1.00 PROM DRILL CTOP T SLB aline heading up firing head. 10,465.0 10,465.0 22:06 23:06 11/6/2018 11/6/2018 0.40 PROD2 DRILL CTOP T Bring up tools from ground and space 10,465.0 10,465.0 23:06 23:30 out fast line sheave in mast. 11/6/2018 11/6/2018 0.30 PROD2 DRILL CTOP T PU/MU SLB drift (weight bar) 10,465.0 10,465.0 23:30 23:48 11/6/2018 11/7/2018 0.20 PROM DRILL CTOP T RIH, pumping 1.0 bpm @ 1,524 psi 10,465.0 10,465.0 23:48 00:00 250', POCH 11/7/2018 1117/2018 2.00 PROD2 DRILL CTOP T PJSM, notify Caelus, COP Security, 10,485.0 10,465.0 00:00 02:00 and DSO radio silence 11/7/2018 11/7/2018 1.00 PROD2 DRILL CTOP T RIH, pumping 1.0 bpm tripping 150 10,465.0 10,465.0 02:00 03:00 fpm towards bottom 8,050' Page 21139 Report Printed: 1 112 0/2 01 8 ,Jerations Summary (with Timelog . aths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Star Time 6p Tine phase OPCode Activi(y Cada Time P-T-X Operation start Depth (110) Bid Depth (WB) 11/7/2018 1117/2018 1.2 1.20 PROD2 DRILL CTOP T Pull up hole 7,980', SL PUW 946 k, 10,465.0 10,465.0 03:00 04:12 hesitate for fluid movement, Bre cutter, indication at surface of full function. RIH to 8,046', POOH 11/7/2018 11/7/2018 0.40 PROD2 DRILL CTOP T PJSM, LD cutter 10,465.0 10,465.0 04:12 04:36 11/7/2018 11!7/2018 3.50 PR0D2 DRILL CTOP T RD, pump in sub, 2x2, and 90 's, 10,465.0 10,465.0 04:36 08:06 install lifting sub onto 5 pitch CTC, lower traveling blocks, latch up 11!7/2018 11/7/2018 1.25 PROD2 DRILL CTOP T PJSM before pulling on tubing, PU to 10,465.0 10,465.0 08:06 09:21 42K string weight, open up lower pipe rams, open up bleeder valves to confirm zero pressure underneath upper pipe rams, open upper pipe rams and remove slips and dog collar, begin pulling tension on coil, 4 cycles at 60K, 3 cycles at 65K, 3 cycles at 70K, 3 cycles at 75K (60K on CTC due to weight of elevators), pipe still not free. Discuss with town engineer plan forward. 11/7/2018 11/7/2018 2.00 PROD2 DRILL CTOP T Decision made to pump down coil to 10,465.0 10,465.0 09:21 11:21 determine If there is circulation through the cut, bring string weight down to 41.5K, shut upper 2" pipe rams, set slips and dog collar, install XO from Baker lifting sub (2-3/8 8rd ELIE to 1502), 2x2 valve. Valves too high to operate from scaffolding so decision made to take Baker lifting sub out of the rig-up to put valves at a safe working height. 11/7/2018 1117/2018 0.50 PROD2 DRILL CTOP T Line up to pump down coil taking 10,465.0 10,465.0 11:21 11:51 returns through the drilling choke. Pump 3 bbls at 0.3bpm/650psi, no returns, increase pump rate to 1 bpm/1300 psi and pump an additional 2 bbls for a total of 5 Wit 11.8 KW F, no returns seen at surface 11/7/2018 11/7/2018 0.50 PROD2 DRILL CTOP T Prep rig floor for rigging up SLB a-line, 10,465.0 10,465.0 11:51 12:21 wait on a-line to show up on location after madatory 8 hour rest period. 11/7/2018 11/7/2018 0.75 PROD DRILL CTOP T Call for scaffold crew to move 10,465.0 10,465.0 12:21 13:06 scaffolding up T due to pipe stretch from pulling tension on coil 1117/2018 11/7/2018 1.40 PROD2 DRILL CTOP T Make decision to work pipe some 10,465.0 10,465.0 13:06 14:30 more, build scaffold up 3', dg up baker ifting sub 11/7/2018 11/7/2018 1.00 PROD2 DRILL CTOP T Measure rig floor to bottom of CTC - 10,465.0 10,465.0 14:30 15:30 91" rior to working ( ) p' g pipe, latch up to liftig sub, open upper pipe rams, pull ' slips and dog collar, work pipe 7 cycles between 75K and 25K, bring string weight back to 41.5K and measure distance to CTC (72"), indicating that we are still stuck. 11/7/2018 11/7/2018 1.20 PROD2 DRILL CTOP T Prep dg floor for a-line operations 10,465.0 10,465.0 0 16:42 2018 11/7/2018 1.50 PROD2 DRILL CTOP T PJSM, call for radio silence, RU and 10,465.0 10,465.0 L16:42 18:12 a" cutter, 2018 1117/2018 2.00 PROD2 DRILL CTOP T Bring cutter to the floor and MU quick 104650 10,465.0 2 2012 union Page 22139 ReportPrinted: 1112012018 . perations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slat Time End line a+(nh phase Cp Cafe Activity Cafe Time P -T-% pperapq, sten Depth (}pig) End perry(RKa) 11/7/2018 11/7/2018U.15 PROD2 DRILL CTOP T RIH, come on line with pump 0.6 bpm 10,465.0 10,465.0 20:12 20:57 B 1,209 psi, 1.0 bpm @ 1600 psi, 5 bbl away, noticed pressure spike to trip at 2,100 psi, shut down pump, check surface lines and line up, surface lines seems to be free, calculate vol from first cut depth (severing head) to top of Nabors CTC, 6.25 bbl, may be the 4" part of the severing head wedged into the BHI upper quick float valves. 11/7/2018 11/8/2018 3.05 PROD2 DRILL CTOP T Continue RIH 100 fpm down to 7,3351, 10,465.0 10,465.0 20:57 00:00 PUH and work wire down hole, pressure up in increments 1,000 psV bleed, 2,000 psi/bleed, 3,000 psi/bleed, and 4,000' psi/bleed, midnight depth 7,357'- 111812018 11/8/2018 1.75 PROD2 DRILL CTOP T Continue to work aline down hole, 10,465.0 10,465.0 00:00 01:45 pressure up and bleed off, working in stages 1,000 psi, 2,000 psi, 3,000 psi, 4,000 psi, unable to move down hole further, phone town team, decision was made to perfrom cut @ 7,357' 1118/2018 11/8/2018 2.00 PROD2 DRILL CTOP T After cut, unable to move up or down 10,465.0 10,465.0 01:45 03:45 hole with a -line, bring pump up 0.59 bpm at 549 psi returns to surface, worked eline, still unable to move up or down, increase pump rate up to 1.7 bpm at 1,130 psi, pulled eline tools free, continue POOH 11/82018 11/8/2018 1.25 PROD2 DRILL CTOP T At 209, call for radio silence, PJSM, 10,465.0 10,465.0 03:45 05:00 LD SLB cutter, RD equipment from cut end of coil 11/8/2018 1118/2018 1.00 PROD2 DRILL CTOP T Bring blocks down and attach to lifting 10,465.0 10,465.0 05:00 06:00 sub 11/82018 11/8/2018 1.00 PROD2 DRILL CTOP T Latch onto lifting sub, open pipe rams, 10,465.0 7,357.0 06:00 07:00 remove slips and dog collar, PU -20' at 37K holding steady, appear to have a goad cut, set back down to original depth and set pipe rams, slips, and dog collars 11/8/2018 11/8/2018 3.50 PROD2 DRILL CTOP T Release SLB a -line, RD equipment 7,357.0 7,357.0 07:00 10:30 from cut end of coil, trim coil and dress stump end for spoolable CTC, make up to spoolable connector on injector and downhole side of coil 11/8/2018 1118/2018 0.50 PROD2 DRILL CTOP T Stab on with injector, test packoffs, 7,357.0 7,357.0 10:30 -f -1/8/2018 11:00 1 pull test connector to 25K 11/8/2018 1.00 PROD2 DRILL CTOP T POOH slowly 1.5 fpm 30K watch for 7,357.0 7,000.0 11:00 12:00 spoolable connector coming through injector, over horses head, and get 3 wraps on reel with connector 11/8/2018 1118/2018 2.35 PROD2 DRILL CTOP T Continue POOH slowly at 80 fpm, 7,000.0 500.0 12:00 14:21 pumping across the top to keep hole full 11/8/2018 11/8/2018 0.65 PROD2 DRILL CTOP T Flow check, confirm well is dead 500.0 500.0 14:21 15:00 11/8/2018 11/82018 0.90 PROD2 DRILL CTOP T Break riser, POOH at 20 fpm until cut 500.0 0.0 15:00 15:54 is seen at surface, cut looks good 11/8/2018 11/8/2018 0.50 PROD2 DRILL CTOP T Stab back on with injector, conduct 0.0 0.0 15:54 16:24 PJSM with HAL N2 for reel blowdown, come online with Nitrogen at 1500 scf/min for 8 minutes (11000 scf N2 total), observed 15 bbls of KWF returns to the Tiger Tank Page 23139 ReportPrinted: 11120/2018 -perations Summary (with TimelOg L aths) 3H -13A 0 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log' 5tadrM12018 FiMriro dr�q Melee Op Coda A ily Code Tyne RT -X oro�n Start Depth (ftKe) �d Depth M(B)11/8/2018 11/812018 1.50 PROM DRILL CTOP T Bleed down N2 from coil and surface 0.0 0.0 16:24 17:54 fines, RD Hal. N2, unstab INJH, install clamp onto free end of coil, skid Icartback 11/8/2018 11/8/2018 0.50 PROD2 DRILL CTOP T Cleanup and organize RF 0.0 0.0 17:54 18:24 11/8/2016 11/8/2018 1.20 PROD2 DRILL CTOP P Grease all equipment and fluid pack 0.0 0.0 18:24 19:36 1 all lines. Prep RF for testing 11/8/2018 11/812018 1.00 PROD2 DRILL CTOP P Obtain shell test, swab leaking by 0.0 0.0 19:36 20:36 phone out Valve crew, service wellhead valves. 11/8/2018 11/912018 3.40 PROD2 DRILL BOPE P Start BOP test, witness waived by 0.0 0,0 20:36 00:00 Guy Cook, November 08, 2018 @ 15:14 pm, 250 psi low/4,800 psi High/2,500 psi Annular, Test #8 midnight *** Sim -ops: Dress and install graple into free end of coil, remove and pin out counters 11/9/2018 11/9/2018 3.00 PROD2 DRILL BOPE P Continue BOP test, Witness waived by 0.0 0.0 00:00 03:00 Guy Cook, November 08, 2018 @ 15:14 pm, 250 psi low/4,800 psi High/2,500 psi Annular, Test #8 - 14 *** Sim -ops: remove inner reel iron 11/912018 11/9/2018 0.50 PROD2 DRILL BOPE P Test #14-15, perform drawdown test 0.0 0.0 03:00 03:30 (7.0 hr test) 11/9/2018 11/9/2018 4.00 PROD2 DRILL CTOP T Continue Reel Swap, remove 0.0 0.0 03:30 07:30 counters, rig down inner reel Iron and bulkhead, install grapple 11/9/2018 11/9/2018 2.50 PROD2 DRILL CTOP T Pull test grapple, PJSM for 0.0 0.0 07:30 10:00 unstabbing, unstab coil tubing 11/9/2018 11/9/2018 1.25 PROD2 DRILL CTOP T Position reel, RU shackles and slings, 0.0 0.0 10:00 11:15 remove saddle clamps, open back doors 11/9/2018 11/9/2018 1.00 PRM DRILL CTOP T Load old reel onto Peak truck, pick up 0.0 0.0 11:15 12:15 reel #52348 and load onto rig 11/9/2018 11/9/2018 5.75 PROD2 DRILL CTOP T position and secure new reel, install 0.0 0.0 12:15 18:00 new stripper brass, install inner reel iron, makeup and pull test grapple 11/9/2018 11/9/2018 2.50 PROD2 DRILL CTOP T Crew Change, PJSM, install new 0.0 0.0 18:00 20:30 stripper and secure to INJH, inspect, adjust, and secure inner reel iron 11/9/2018 11/9/2018 1.50 PROM DRILL CTOP T Install and pull test grapple, re -tighten 0.0 0.0 20:30 22:00 grapple, remove all banding and shipping material from reel 11/9/2018 11/9/2018 1.25 PROD2 DRILL CTOP T PJSM, stab coiled tubing into INJH 0.0 0.0 22:00 23:15 11/9/2018 11/10/2018 0.75 PROD2 DRILL CTOP T Prep free end of coiled tubing for CTC 0.0 0.0 23:15 00:00 installation Sim -ops: PJSM, blow air thru CSL, RU little red services to CSL, 11/10/2018 11/10/2018 0.80 PROD2 DRILL CTOP T Continue MU new coiled tubing 0.0 0.0 00:00 00:48 _ reel.load 5 bbl of meothonal into reel, dress free end of coiled tubing for CTC, pull test 35 k (good -test) 11/10/2018 11/10/2016 1.00 1 PROD2 DRILL CTOP T Head up BHI upper quick connect, 0.0 0.0 00:48 01:48 (good -test), >2000/65. install nozzle 11/1012018 11/10/2018 2.00 PROD2 DRILL CTOP T Slide cart forward, stab onto stump, 0.0 0.0 01:48 03:48 follow meothanol with fresh water, taking returns to kill tank. Page 24/39 ReportPrinted: 111120120181 perations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sbrl Tme End Tme Dwihr) Phase Op CoOe AdNiry Cotle Time P -T -X DpwaUan Stat Depth 000) End DepthdlW 11/10/2018 11/10/2018 1.20 PROD2 DRILL CTOP T Line up to test inner reel valve and 0.0 0.0 03:48 05:00 pac-off 250 psi low/4,800 psi high 11/10/2018 11/10/2018 2.50 SLOT WELLPR PULD T PU/MU cleanout BHA#15 0.0 62.4 05:00 07:30 11/10/2018 11/10/2018 1.55 SLOT WELLPR TRIP T RIH with cleanout BHA#15, pumping 62.4 7,060.0 07:30 09:03 11.8 KWF at 1 BPM IAlOA= 657psi/509psi 11/10/2018 11/10/2018 0.15 SLOT WELLPR DLOG T Log Kt, +19' correction 7,060.0 7,088.0 09:03 09:12 11/10/2018 11/10/2018 0.30 SLOT WELLPR TRIP T Continue to RIH, Wt Chk at 71 DO' = 7,088.0 7,340.0 09:12 09:30 30K, slow down and tum around at 7340', did not stack out on whipstock or stuck end of coil 11/10/2018 11/10/2018 1.50 SLOT WELLPR CIRC T PUH to new TOWS depth 7315' and 7,340.0 7,315.0 09:30 11:00 displace well to 8.6 ppg Power Pro 11/10/2018 11/10/2018 2.00 SLOT WELLPR CIRC T On bottom, recip pipe and clean hole 7,315.0 7,315.0 11:00 13:00 pumping 1.8 BPM, drop rate to 1.6 BPM for 15 minutes to calibrate choke, continue to recip pipe while building sweeps in mud pits, circ�3800 psi diff=400 psi IA=669 OA=569 11/10/2018 11/10/2018 2.25 SLOT WELLPR CIRC T POOH pumping with 1.8 BPM, making 7,315.0 62.4 13:00 15:15 multipleo / gging passes and pumping three 5x5 sweeps 11/10/2018 11/10/2018 1.60 SLOT WELLPR PULD T PUD BHA #15, WHP=775 psi 62.4 0.0 15:15 18:51 11/10/2018 11/10/2018 1.30 PROD1 RPEQPT PULD T PD, WS setting BHA 0.0 73.6 16:51 18:09 11/10/2018 11/10/2018 1.50 PROM RPEQPT TRIP T RIH, with WS settling BHA#16, 3-1/2" 73.6 7,090.0 18:09 19:39 Monobore XL Whipstock 11/10/2018 11/10/2018 0.20 PROM RPEQPT DLOG T Log the K1 marker correction of minus 7,090.0 7,128.8 19:39 19:51 6,0' 11/10/2018 11/10/2018 0.20 PRODt RPEQPT DLOG T Continue IH to setting depth, close 7,128.8 7,325.5 19:51 20:03 EDC 11/1012018 11/10/2018 0.15 PROD1 RPEQPT DLOG T 7,315', (Anchor @ 0" HS), PUW 35 k, 7,325.5 7,315.0 20:03 20:12 RBIH to setting depth, PUW 32 k, bring pump up to shear 5,400 psi, set down 5.5 k DHWOB, PUW 35 k 11/10/2018 11/10/2018 1.50 PRODt RPEQPT TRIP T POOH, pumping 1.2 bpm at 2,775 psi 7,315.0 73.6 20:12 21:42 11/10/2018 11/10/2018 1.00 PROM RPEQPT PULD T PUD, WS setting tools 73.6 0.0 21:42 22:42 11/10/2018 11111/2018 1.30 PROD1 WHPST PULD T PD, Window milling assembly 0.0 74.3 22:42 00:00 11/11/2018 11/11/2o18 1.40 PROD? WHPST TRIP T RIH, w/window milling assembly 0.6° 74.3 7,090.0 00:00 01:24 ako motor, re -run string reamer (run#6) 2.80"OD and new DSM 2.80"OD 11/11/2018 11/11/2018 0.20 PROD1 WHPST DLOG T Log the K1 marker correction of minus 7,090.0 7,128.0 01:24 01:36 6.5' 11/11/2018 11/11/2018 0.30 PRODt WHPST TRIP T Continue IH 7,128.0 7,315.0 01:36 01:54 11/11/2018 11/11/2018 0.10 PROW WHPST WPST T Dry tag TOWS @ 7,315', PUW 35 k 7,315.0 7,315.0 01:54 02:1 11/1112018 11/11/2018 5.00 PROD1 WHPST WPST T Bdng pump online @ 1.7 bpm @ 7,315.0 7,318.0 02:00 07:00 4,056 psi, Diff --530, WHP=325, BHP=3,651, IA=659, OA=533 11/11/2018 11/11/2018 2.00 PROM WHPST WPST T Continue milling window @ 1.9 7,318.0 7,321.0 07:00 09:00 BPM/4120 psi, WHP=310 psi, Diff=650 psi, BHP=3630 psi, IA/OA--683/632, WOB=1500 lbs Page 25/39 ReportPrinted: 11/20/2018 Aerations Summary (with Timelog , pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log StarlTime 6b Tme OurlM Pham Op Catle Actihly Coda Tme P-T-X Opmallaa Stark Depth (Ito) End Depth M<a) 11/11/2018 11/11/2018 1.75 PROD1 WHPST WPST T Continue milling window @1.9 7,321.0 7,325.0 09:00 10:45 BPM14020psi, WOB drops to 1030 lbs, T/1/0=313/690/669, Di"- 10, BHP=4245 11/11/2018 11/11/2018 2.00 PROD1 WHPST WPST T Through window, mill 11' of rathole. 7,325.0 7,336.0 10:45 12:45 1.9BPM, circ=4200psi, Diff=750psi, WOB=2300lbs, BHP=4400psi, T/1/O=33716921688 11/11/2018 11/11/2018 2.40 PROD1 WHPST REAM T Dress window, make 5 reaming 7,336.0 7,315,0 12:45 15:09 passes at 1 fpm, 2 at as drilled TF, 30° ROHS, 30' LOHS, and 180' ROHS, come offline with pumps and dry drift window, clean. 11/11/2018 11/11/2018 1.60 TROD1 TRIP T Open EDC and POOH pumping 1.9 7,315.0 74.3 15:09 16:45 BPM 11/11/2018 11/11/2018 1.25 PROD1 WHPST PULD T At surface, spaceout, PUD milling 74.3 0.0 16:45 18:00 BHA#17 Note: Mills gauged 2.80 no-go 11/11/2018 11/11/2018 1.00 PROD1 DRILL PULD T PD, pre-loaded Bulk[ assembly 0.0 72.2 18:00 19:00 11/11/2018 11/11/2018 1.30 PROD1 DRILL TRIP T Tag up, reset counters, RIH w/ Build 72.2 7,080.0 19:00 20:18 BHA#18, 2.5° ako, P104 bi-center bit 11/11/2018 11/11/2018 0.20 PROD1 DRILL DLOG T Log the Kl markercormction of minus 7,080.0 7,108.3 20:18 20:30 5.5' 11/11/2018 11/11/2018 0.30 PROD1 DRILL TRIP T Continue IH to bottom, close EDC, 7,108.37,336.0 20:30 20:48 PUW 36 k 11/11/2018 11/11/2018 0.70 PROD1 DRILL DRLG T OBD, 1.9 bpm at 4,100 psi, Diff=600 7,336.0 7,423.0 20:48 21:30 psi, BHP=3,710, WHP=335, IA=691, OA=638 11/11/2018 11/11/2018 0.20 PROD1 DRILL WPRT T Short wiper up hole, PUW 37 k 7,423.0 7,090.0 21:30 21:42 11/11/2018 11/11/2018 0.20 PROD1 DRILL DLOG T Log the K1 marker no correction, 7,090.0 7,335.0 21:42 21:54 continue IH log the RA marker, PUW 37 k - Note: Offical Window Depths TOWS=7,315' BOW=7,320' RA Marker-7321' 11/11/2018 11/11/2018 0.20 PROD1 DRILL WPRT T Continue IH 7,335.0 7,423.0 21:54 22:06 11/11/2018 11/12/2018 1.90 PR0D1 DRILL DRLG T BOBD, 1.9 bpm at 4,086 psi, Diff--515 7,423.0 7,616.0 22:06 00:00 psi, WHP=298, BHP=3,706, IA=694, OA=673 11/12/2018 11/12/2018 2.20 PROD1 DRILL DRLG T OBD, 1.9 bpm at 4, 181 psi, DlfF-530 7,616.0 7,760.0 00:00 02:12 psi, WHP=323, BHP=3,666, IA=688, OA=649 Note: New mud at the bit @ 7,620' 11/12/2018 11112/2018 1.50 PR0D7 DRILL TRIP T POOH 7,760.0 78.3 02:12 03:42 11/12!2018 91M212018 1.25 PROD1 DRILL PULD T At surface, space out, PUD build 78.3 0.0 03:42 04:57 1 assembly 11/12/2018 11/12/2018 1.25 PROD1 DRILL PULD T Make up and PD AL1 lateral drilling 0.0 78.3 04:57 06:12 BHA#19 11/12/2018 11/12/2018 1.50 PROD1 DRILL TRIP T RIH 78.3 7,073.0 06:12 07:42 11/12/2018 11/12/2018 0.20 PRUD1 URILL T Log K1,-7.6 correction 7,073.0 7,117.0 07:42 07:54 11/12/2018 11/12/2018 0.30 PROD1 DRILL TRIP T wt check @71 00'=34K, continue to 7,117.0 7,760.0 07:54 08:12 RIH to build TO Page 26139 ReportPrinted: 1112012018 „ ,aerations Summary (with Timelog , aths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Tirtre log StatTime EMTme Our (M) Phase Op Code Nfivity Code Time P -T -X pperalion Sled Depth (RKB) End Depth M) 11/1212018 11/1212018 0.40 PROM DRILL DRLG T Record free spin, diff=1671 psi, reset 7,760.0 7,827.0 08:12 08:36 WOB and tag build TD at 7660', drill ahead, WOB=2700 lbs, Diff=1820 psi, circ=5546 psi, BHP=5734 psi, T/1/0=336/6811552, wt check @7764'=35K 11/12/2018 11/12/2018 0.20 PROM DRILL WPRT T Returns drop off to 0.4 BPM (pumping 7,827.0 7,804.0 08:36 08:48 1.9 BPM), PUH to 7804' PUW=35K 11/1212018 11/1212018 0.10 PROM DRILL WPRT T RBIH 7,804.0 7,827.0 08:48 08:54 11/12/2018 11/12/2018 0.10 PROM DRILL DRLG T OBD, lose returns ay 7864' 7,827.0 7,864.0 08:54 09:00 11/1212018 11/12/2018 0.10 PROM DRILL WPRT T Pick up to above 7827' to let losses 7,864.0 7,827.0 09:00 09:06 heal, PUW=39K 11/1212018 11/12/2018 0.10 PROM DRILL WPRT T RBIH 7,827.0 7,864.0 09:06 09:12 11/12/2018 11/1212018 0.10 PROD? DRILL DRLG T OBD, plan for wipers to end of build 7,864.0 7,900.0 09:12 09:18 every 100' 11/1212018 11/12/2018 0.05 PROM DRILL WPRT T Wiper to EOB, PUW=38K 7,900.0 7,772.0 09:18 09:21 11/12/2018 11/12/2018 0.05 PROM DRILL WPRT T RBIH 7,772.0 7,900.0 09:21 09:24 11/12/2018 11/12/2018 0.60 PROM DRILL DRLG T OBD, WOB=16001bs, circ=5440 psi, 7,900.0 8,000.0 09:24 10:00 diff -1850 psi, BHP=5600 psi, T/1/0=310/6841588 11/1212018 11/12/2018 0.10 PROM DRILL WPRT T Wiper trip to End of Build, PUW=38K 8,000.0 7,766.0 10:00 10:06 11/12/2018 11/12/2018 0.10 PROD1 DRILL WPRT T RBIH 7,766.0 8,000.0 10:06 10:12 11/12/2018 11/12/2018 3.50 PROM DRILL DRLG T OBD, performing BHA wipers every 8,000.0 8,400.0 10:12 13:42 100' drilled, 1.9 BPM @ 5512 psi, Diff --2035 psi, BHP=5755 psi, T/1/0=307/687/602, WOB=2520 lbs, PUW=37K@8100', 37K@8200', 40K@8358' 11/12/2018 11/1212018 0.25 PROM DRILL WPRT T Wiper trip to EOB 7770', PUW=40K 8,400.0 7,770.0 13:42 13:57 11/12/2018 11/12/2018 0.35 PROM DRILL WPRT T RBIH, set down 1400 Ibis WOB at 7,770.0 8,400.0 13:57 14:18 8300' MD (near end of high GR section), PU 10' and RBIH no problem 11/1212018 11/12/2018 3.00 PROM DRILL DRLG T OBD at 1.9 BPM/5634 psi, 8,400.0 8,810.0 14:18 17:18 WOB=2510 lbs, Diff --1961 psi, BHP=5731 psi, T/1/0=277/697/673, pull BHA wipers every 100', PUW's=37K@8505', 38K@8600', 38K@8700- 1111212018 11/12/2018 0.87 PROM DRILL WPRT T Wiper up hole to the window, PUW 38 8,810.0 7,336.0 17:18 18:10 k 11112/2018 11/12/2018 0.20 PROD1 DRILL DLOG T Log the RA marker correction of plus 7,336.0 7,363.0 18:10 18:22 1 1 2.5' 11/12/2018 11/1212018 0.65 PROM DRILL WPRT T Wiper back in hole, RIW 10 k, 8,200' 7,363.0 8,749.0 18:22 19:01 notice pump (bore) pressure climbing, continue IH, attempt to bring pump rate up to drilling rate, 1.53 bpm at 2000 psi Diff. 11/12/2018 11/12/2018 2.80 PROM DRILL TRIP T POOH, to inspect BHA (agitator), 8,749.0 78.2 19:01 21:49 performing Jog above window, and @ 1,990' (700'), Page 27139 Report Printed: 11/20/2018 Aerations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log 821 Tone Erb Tine Our@0 Phase Op Cotle Mdrky Cotle 7me P -T -x Operalim slad oePM (fit®) End Depth lfll(B) 11/12/2018 11/12/2018 1.69 PROD1 DRILL PULD T At surface, space out, PUD drilling 78.2 0.0 21:49 23:30 BHA#19 "' Note: Found Lower Bearing housing on mud motor had backed completly off. 11/12/2018 11/13/2018 0.49 PROD1 DRILL PULD T PD, All lateral drilling BHA #20 0.0 78.2 23:30 00:00 11/13/2018 11/13/2018 1.00 PROD1 DRILL PULD T Finish PD lateral drilling BHA #20 78.2 78.2 00:00 01:00 11/13/2018 11/13/2018 1.60 PROD1 DRILL TRIP T RIH, with AL1 lateral drilling BHA#20, 782 7,090.0 01:00 02:36 0.5° ako, RR bi-center bit, surface test agitator@ 517' (good -test) 11/13/2018 11/13/2018 0.20 PROD1 DRILL DLOG T Log the K1 correction of minus 5.5', 7,090.0 7,128.0 02:36 02:48 PUW 37k "' Note: 7.5 hire NPT (BHI) 11/13/2018 11/13/2018 0.65 PROD? DRILL TRIP T Continue IH, setting down @ 8,228', 7,128.0 8,296.0 02:48 03:27 PUW 38 k, lower pump rate RBIH, clean pass spot brought pump back up to 1.5 bpm, set down again at DTF 8,296', PUW 50k, -6 k DHWOB, continued up hole, seeing drag -1.1 k- 3.2 k, 11/13/2018 11/13/2018 1.20 PROD1 DRILL WPRT T Continue PUH, pumping bottoms up, 8,296.0 7,605.0 03:27 04:39 sand in sample (no -rocks), make call Ito TT. 11/13/2018 11/13/2018 0.30 PROD1 DRILL WPRT T RBIH to 8,200', line up and pump 5x5 7,605.0 8,200.0 04:39 04:57 sweep hilow, 11/13/2018 11/13/2018 1.00 PROD1 DRILL WPRT T Chase sweep to surface 8,200.0 5,500.0 04:57 05:57 11/13/2018 11(13/2018 1.20 PROW DRILL TRIP T RBIH, log K1 +2' correction, set dawn 5,500.0 8,254.0 05:57 07:09 @ 8222' WOB=2K PUW=38K, pull up 50' and RIH, set down @ 8254' WOB=3.1 K PUW=38K, pick up 100' and RIH again, set down @ 8212' WOB=3.5K PUW=45K, pick up 40' and RBIH, set down @ 8245' WOB=2.6K PUW=38K 11/13/2018 11/13/2018 0.30 PRODt DRILL WPRT T PUH and confer with Town Engineer 8,254.0 7,342.0 07:09 07:27 11/13/2018 11/13/2018 0.20 PROD1 DRILL WPRT T RBIH to a cleanout depth of 8100' 7,342.0 8,100.0 07:27 07:39 . 11/13/2018 11/13/2018 3.20 PROD1 DRILL WPRT T Cleanout hole from 8100' pumping 8,100.0 78.2 07:39 10:51 5x5 sweeps and making multiple jogs in on way out of hole, HOT tool cutting out on way out of hole, will inspect at surface and run new BHA 11/13/2018 11/13/2018 1.10 PROD1 DRILL PULD T Tag up, PUD ALl lateral drilling BHA 78.2 0.0 10:51 11:57 #20 11/13/2018 11/13/2018 1.50 PROD1 STK PULD T Make up and PD aluminum billet 0.0 73.4 11:57 13:27 1 WOH Anchor BHA #21 11/13/2018 11/13/2018 1.40 PROD1 STK TRIP T RIH with BHA #21 @ 60 fpm w/EDC in 73.4 7,054.0 13:27 14:51 Open position, slow down through window, build, and openhole sections 11/13/2018 11/13/2018 0.20 PRODi STK DLOG T Log K1, -7' correction 7,054.0 7,120.0 14:51 15:03 11/13/2018 11/13/2018 0.40 PROD1 STK TRIP T RIH to 6011.78' and pull slack out of 7,120.0 8,011.8 15:03 15:27 coil to set Top of Billet at 8000' Page 28139 Report Printed: 11120/2018 perations Summary (with Timelog . _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log stenrme End lkne Dix IN) nese Dp code n<uwN Code Tkw P -Tat opereuon Stift Depth M) End Depth MM 11/13/2018 11/13/2018 0.20 PROD STK WPST T PUW=34K pre-set, close EDC and 8,011.8 8,011.8 15:27 15:39 come online w/pumps, sheared at 5166 psi / 1.2 BPM (DiH=1500 psi), set down 3600 lbs to confirm Openhole Anchored Billet is set. 11/13/2018 11/13/2016 1.50 PROD1 STK TRIP T POOH 8,011.8 61.7 15:39 17:09 11/13/2018 11/13/2018 2.00 PROD1 STK PULD T PUD, setting tools, crew change, 61.7 0.0 17:09 19:09 PJSM, swap out tools, PU motor and agitator, LD MWD tool, PU Res tool, MU HOT-FVS, scribe to motor. 11/13/2018 11/13/2018 1.00 PROM 9 -TK -TU -LD T PD, kickoff/drilling BHA, MU to upper 0.0 78.3 19:09 20:09 quick, surface test (good -test), MU INJH, tag up, re -set counter depths, check pac-offs (good) 11/1312018 11/13/2018 11/13/2018 1.25 FR STK TRIP T RIH, w/kickoff/drillingHA B#22, 78.3 7,090.0 20:09 21:24 •" Note: Test agitator 1.5 bpm @ 4,141 psi, and 1.9 bpm @ 5,100 psi 11/13/2018 11/13/2018 0.20 PROD1 STK DLOG T Log the K1 marker correction of minus 7,090.0 7,128.0 21:24 21:36 7.5', PUW 34 k 11/13/2018 11/13/2016 0.50 TROD1 TRIP T Continue IH, dry tag TOB @ 8,000', 7,128.0 8,000.0 21:36 22:06 2.5k DHWOB, PUW 35 k 11/13/2018 11/13/2018 0.13 PROD1 STK KOST T PUH, obtain drilling parameters, 1.9 8,000.0 7,999.0 22:06 22:13 bpm at 5,082 psi, Diff -1,215 psi, WHP=256, BHP=3,725, IA=698, OA=645 11/13/2016 11/13120180.80 PROD1 STK KOST T Kickoff billet @ time drilling @ 1 ft/hr 7,999.0 8,000.2 22:13 23:01 11/13/2018 11/13/2018 0.60 PROD1 STK KOST T Kickoff billet @ time drilling -92 2 R/hr 8,000.2 8,001.2 23:01 23:37 11/13/2018 11/13/2018 0.20 PROD1 STK KOST T Kickoff billet @ time drilling @ 3 R/hr 8,001.2 8,001.9 23:37 23:49 11/13/2018 11/14/2018 0.17 PROD1 DRILL DRLG T Drill ahead @ 1 k DHWOB 8,001.9 8,011.0 23:49 00:00 11/14/2018 11/14/2018 0.67 PROD1 DRILL DRLG T Drilling Ahead, 1.9 bpm at 5,082 psi, 8,011.0 8,124.0 00:00 00:40 Diff --1,215 psi, WHP=189, BHP=3,748, IA=698, OA=648 DHWOB=2.0 k CTSW=11.0 k 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T PUH, dry drift kickoff point (clean) , 8,124.0 7,970.0 00:40 00:46 PUW 35 k 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T Wiper back in hole, RIW 12 k 7,970.0 8,124.0 00:46 00:52 -PRO 11/14/2018 11/14/2018 1.30 D1 DRLG T OBD, 1.9 bpm at 5,115 psi, Diff -1,215, 8,124.0 8,350.0 00:52 02:10 WHP=213, BHP=3,747, IA=698, OA=649 DHWOB=1.9-2.4 k CTSW=8-12 k 11!1412018 11/14/2018 0.20 PRODt DRILL WPRT T Wiper up hole, PUW 38 k 8,350.0 8,080.0 02:10 02:22 11/14/2018 11/14/2018 0.20 PRODt DRILL WPRT T Wiper back in hole, RIW 12 k 8,080.0 8,350.0 02:22 11/1412018 2016 1.35 PRODI DRILL DRLG T BOBD, 1.9 bpm at 4,962 psi, 8,350.0 8,550.0 02:34 Diff=1,155 psi, WHP=210, !!!! BHP=3,789, IA=701, OA=671 DHWOB=2.5 k CTSW=9.0 k Page 29139 Report Printed: 11/2012018 perations Summary (with Timelog _ _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slav Time EM Tme our Qu) Phase OP Cade rcwiy Code Time P -T -X operation sten Depth Me) FSM Depth MUM 11/14/2018 11/14/2018 0.15 PROD1 DRILL WPRT T 100' Wiper up hole, PUW 40 k 8,550.0 8,550.0 03:55 04:04 11/1412018 11/14/2016 1.50 PROD1 DRILL DRLG T OBD, 1.9 bpm at 5,114 psi, 8,550.0 8,780.0 04:04 05:34 BHP=3,787, WHP=207, IA=702, OA=671 DHWOB=2.1 k CTSW=8.0 k 11/14/2018 11/142018 0.30 PROD1 DRILL WPRT T Wiper up hole, PUW 35K 6,760.0 8,035.0 05:34 05:52 11/14/2018 11114/2018 0.20 PROD1 DRILL WPRT T Wiper back in hole, RIW 12K 8,035.0 8,780.0 05:52 06:04 11/14/2018 11/14/2018 0.70 PROD1 DRILL DRLG T BOBD, 1.9 bpm at 5650 psi, 8,780.0 8,880.0 06:04 06:46 Diff=1,670 psi, WHP=210, BHP=5470 DHWOB=2.5 k 11/14/2018 11/14/2016 o.10 PRODt DRILL DRLG T 100'wiper up hole, PUW=40K 8,880.0 8,880.0 06:46 06:52 11/14/2018 11/14/2018 0.80 PROD1 DRILL DRLG T BOBD. 1.9 bpm at 5419 psi, Diff=1490 8,880.0 8,980.0 06:52 07:40 psi, WHP=210, BHP=5289, IA=703, OA ---693 DHWOB=2.1 K 11/142018 11/14/2018 0.10 PROD1 DRILL WPRT T 100' wiper Up hole,PUW=35K 8,980.0 8,980.0 07:40 07:46 11/14/2018 11/14/2018 0.50 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 5583 psi, Diff=1564 8,980.0 9,080.0 07:46 08:16 psi, WHP=219, BHP=5412, IA=703, OA -693 WOB=2.1K 11/14/2018 11/1412018 0.10 PROD1 DRILL WP ­RT T 100'wiper up hole, PUW=35K 9,080.0 9,080.0 08:16 08:22 11/14/2018 11/14/2018 1.50 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 5584 psi, Diff=1561 9,080.0 9,190.0 08:22 09:52 psi, WHP=233 psi, BHP=5362 psi, IA=703, OA=697 WOB=2.2K 11/14/2018 71/142018 0.80 PR0D1 DRILL WPRT T Window Wiper, PUW=38K 9,190.0 7,334.0 09:52 10:40 11/142018 11/14/2018 o.76 PROD1 DRILL WPRT T Wiper back in hole, RIW=12K 7,334.0 9,190.0 10:40 11:22 11/142018 11/14/2018 0.50 15ROD1 DRILL DRLG T OBD, 1.9 BPM @ 5619, Diff=1550, 9,190.0 9,290.0 11'22 11:52 BHP=5349 WOB=1540 Ibs HKLD=2K *Mud Swap: Begin pumping new mud at 9262" 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T BHA Wiper 100' up hole, PUW=36K 9,290.0 9,290.0 11:52 11:58 11/14/2018 11/14/2018 0.60 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 4920 psi, 9,290.0 9,390.0 11:58 12:34 Diff=1102psi, WHP=289, BHP=4863, IA=697, OA=664 WOB=2.3K 11/14/2018 11/14/2018 0.10 PROD1 DRILL WPRT T 100'wiper uphole, PUW=36K 9,390.0 9,390.0 12:34 12:40 11/14/2018 11/14/2018 0.80 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 5270 psi, Diff=1511, 9,390.0 9,490.0 12:40 13:28 WHP=321, BHP=5346, IA=696, OA=655, WOB=2.5K 11/14/2018 11/142016 0.10 PROD1 DRILL WPRT T 100'wiper uphole,PUW=39K 9,490.0 9,490.0 13:28 13:34 Page 30139 ReportPrinted: 11/2012018 aerations Summary (with Timelog . .pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SM TM ew Tire DN" Ph1 �tAtl= ArlA'IIrC�B rrI118 P -r -Jt �r� S D.PM em nepn(flka) 11/14/2018 11/14/2018 0.80 PROD1 DRILL DRLG T OBD, 1.9 BPM @ 5127 psi, Diff -1302, 9,490.0 9,590.0 13:34 14:22 WHP=306, BHP=5229, IA=695, OA=629, WOB=2.2K 11/14/2018 11/14/2018 0.20 PROD1 DRILL WPRT T Wiper trip, PUW=38K 9,590.0 8,590.0 14:22 14:34 11/14/2018 11/14/2018 0.30 PROD1 DRILL WPRT T RBIH 8,590.0 9,590.0 14:34 14:52 11/14/2018 11/14/2018 1.30 TRODI DRLGTRLG T BOBD, 1.9 BPM @ 5301 psi, 9,590.0 9,741.0 14:52 16:10 Diff --1450, WHP=299, BHP=5332, IA=694, OA=11, WOB=2.4K MWD tools acting up @ 9671' (DGS, HOT, DPS, RES all intermittent, continue drilling ahead) 11/14/2018 11/14/2018 2.25 PROD1 DRILL TRIP T Decision made to POOH to inspect 9,741.0 78.3 16:10 18:25 and changeout BHA, PUW=38K 11/14/2018 11/14/2018 2.20 PROD1 DRILL PULD T PJSM, Driller side PDL froze„ work SL 78.3 0.0 18:25 20:37 free, PUD, AL1 drilling BHA#22 11/14/2018 11/14/2018 1.70 PROD1 DRILL PULD T PD preloaded tools, AL1 drilling BHA 0.0 78.3 20:37 22:19 #23, PU/MU INJH to BHI tools, perfom sufaoe test (ggod-test), continue onto stabbing the INJH, space out, re -set depths 11/14/2018 11/14/2018 1.35 PROD1 DRILL TRIP T RIH MALI drilling assembly 0.5'- ako 78.3 7,090.0 22:19 23:40 motor, and RR bi-center bit. 11/14/2018 11/14/2018 0.20 PROD1 DRILL DLOG T Log the K1 marker correction of minus 7,090.0 7,128.0 23:40 23:52 5.5' 11/1472018 11/15/2018 0.13 PROD- DRILL TRIP T Continue IH 7,128.0 7,430.0 23:52 00:00 "** Note:7.3 hrs NPT (BHI) 11/15/2018 11/15/2018 0.80 PROM DRILL TRIP T Continue IH 7,430.0 9,741.0 00:00 00:48 11/15/2018 11/15/2018 1.00 PRODt DRILL DRLG T BOBO, 1.9 bpm at 4,944 psi, 9,741.0 9,897.0 00:48 01:48 Diff --1,096 psi, WHP=332, BHP=3,882, IA=692, OA=594 11/15/2018 11/15/2018 0.10 PROD1 DRILL WPRT T 100'BHA wiper up hole, PUW 9,697.0 9,812.0 01:48 01:54 11/15/2018 11/15/2018 0.10 PROD1 DRILL WPRT T Wiper back in hole, RIW 9.4 k 9,812.0 9,897.0 01:54 02:00 11/15/2018 11/15/2018 1.25 PROD1 DRILL DRLG T BOBO, 1.9 bpm at 4,944 psi, 9,897.0 10,100.0 02:00 03:15 Diff -1,096 psi, WHP=332, BHP=3,882, IA=692, OA=594 11/15/2018 11/15/2018 1.10 PROD1 DRILL WPRT T TD 10,100', chase 5x5 to window 10,100.0 7,315.0 03:15 04:21 11/15/2018 11/15/2018 1.60 PROD1 DRILL WPRT T Continue wiper to the swab valve, 7,315.0 69.5 04:21 0557 PUW 35 k, performing jogs @ 5,000', 1,500', and 500' 11/15/2018 11/15/2018 1.30 PROD1 DRILL TRIP T Trip back in hole 69.5 7,000.0 05:57 07:15 11/15/2018 11/15/2018 0.10 PROD1 DRILL DLOG T Log K1,+27'conection 7,000.0 7,113.0 07:15 07:21 11/15/2018 11/15/2018 0.40 PROD1 DRILL DLOG T Perform static pressure survey above 7,113.0 7,300.0 07:21 07:45 the window, trap 11.8 ppg and falls off to 11.6 ppg in 14 minutes 11!15/2018 11/15/2018 0.10 PROD1 DRILL DLOG T Continue to RIH, log RA, no 7,300.0 7,361.0 07:45 07:51 correction, 11/15/2016 11/15/2018 1.00 PROD1 DRILL TRIP T RIH, confirm TO at 10,100', PUW=33K 7,361.0 10,100.0 07:51 08:51 11/15/2018 11/15/2018 1.10 PROD1 DRILL DISP T Circulate off bottom while weighting up 10,100.0 10,100.0 08:51 09:57 liner running pill, 1.55 BPM @ 4050 psi Page 31139 ReportPrinted: 1112012018 Aerations Summary (with Timelog , .pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Slat True End7me Du (hr) Phm Op Code ACWXJCode Tune P.T-X Operation Start Depar (al®) End DepN(WB) 11/15/2018 11/15/2018 1.50 FROM DRILL DISP T Lay in 11.8 ppg NaBR liner running pill 10,100.0 6,000.0 09:57 11:27 with 2 ppb alpine beads (52 BELS), paint TD flag at 8633.4' and 11/15/2018 11/15/2018 1.20 PROM DRILL U1,5 I, T Continue POOH laying in 11.8 ppg 6,000.0 78.3 11:27 12:39 NaBR completion fluid, paint window flag @ 5778.3' 11/15/2018 11/15/2018 0.60 PROM DRILL DISP T Flow check well to confirm killed, 78.3 78.3 12:39 13:15 SIMOPS: PJSM for running liner 11/15/2018 11/15/2o18 0.5o PROD1 DRILL PULD T Lay down BHA#23 78.3 0.0 13:15 13:45 11/15/2018 11/15/2018 0.70 PROD? CASING PUTB T Prep rig floor for running liner 0.0 0.0 13:45 14:27 11/15/2018 11/1512018 2.00 FROM CASING PUTB T Make up Non=ported bullnose, 47 0.0 1,495.8 14:27 16:27 joints of 2-3/8" 4.7# L-80 ST -L Slotted Liner, and shorty deployment sleeve 11/15/2018 11/15/2018 1.40 5ROD1 CASING PULD T Pick up coil track tools for liner running 1,495.8 1,540.0 16:27 17:51 BHA #24 11/15/2018 11/15/2018 1.00 PROD1 CASING RUNL T RIH with lower liner segment 1,540.0 7,240.0 17:51 18:51 11/15/2018 11/15/2018 0.50 PROD1 CASING RUNL T Come offline with pumps, continue 7,240.0 8,420.0 18:51 19:21 RIH, HKLD=I9K 11/16/2018 11/15/2018 0.10 FROM CASING DLOG T slow down to log K1, O' correction 8,545.0 8,603.0 19:21 19:27 11/15/2018 11/15/2018 0.70 PROD1 CASING RUNL T continue in hole, work liner down from 8,603.0 10,100.0 19:27 20:09 8603' to 8805' making multiple pickups, weight starts to come back and continue RIH at 50 fpm, 14K HKLD 11/15/2018 11/15/2018 0.10 PR5D1 CASING RUNL T Tag bottom at 10,100', PUW=45K, set 10,100.0 8,604.2 20:09 20:15 back down and come online with pumps 1.4BPMI3000psi, release off liner, PUW=33K 11/15/2018 11/15/2618 2.00 PROD1 CASING TRIP T Trip out of hole, pumping down 8,604.2 44.2 20:15 22:15 1 backside 11/15/2018 11/15/2018 0.50 FROM CASING PULD T L/D lower liner running BHA#24 44.2 0.0 22:15 22:45 11/15/2018 11/15/2018 1.00 FROM CASING PUTB T Prep Rig floor for running liner 0.0 0.0 22:45 23:45 11/15/2018 11/16/2018 0.25 PROD1 CASING PUTB T Start PU upper slotted liner segment 0.0 94.3 23:45 00:00 11/16/2018 11/16/2018 2.00 PRODt CASING PUTB T Continue PU slotted liner 3-363 94.3 1,128.2 00:00 02:00 11/16/2018 11116/2018 0.25 FROM CASING PULD T RD liner running equipment. 1,128.2 1,128.2 02:00 02:15 11/16/2018 11/162018 0.60 PROD1 CASING PULD T PUIMU ColitrakTools, surface test 1,128.2 1,172.4 02:15 02:51 (good -test), inspect pac-off (good), "' Note: Hanging weight 5,600 lbs 11/16/2018 11/16/2018 1.25 PROD1 CASING RUNL T Tag up, reset counters, RIH w/BHA 1,172.4 7,182.0 02:51 04:06 1 #25 11/16/2018 11/16/2018 0.15 PROD1 CASING RUNL T Correct to the EOP flag (minus 9.16'), 7,182.0 7,182.0 04:06 04:15 PUW 35 k 11/1612018 11/16/2018 1.70 PROD1 CASING RUNL T Continue IH, work liner down 6,232'- 7,182.0 8,603.1 04:15 05:57 8603.4' 11/161201811/16/2018 0.60 PROD1 CASING RUNL T Bring pump up to 1.4 bpm @ 2,046 8,603.1 8,603.1 05:57 06:33 psi, 59 psi differential pressure, unable to release from liner. decision was made to POOH 11/16/2018 11/16/2018 1.50 PROD1 CASING RUNL T Line up across the top, POOH 8,603.1 1,123.3 06:33 08:03 11/162618 11/16/2018 0.50 PROD1 CASING PULD T At surface, check well for flow, LD 1,123.3 1,123.3 08:03 08:33 Coiltrak tools, found EDC Page 32139 ReportPrinted: 11/20/2018 Aerations Summary (with Timelog � pths) 3H -13A C.nocoPhilllps Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log SFetroe Erre rma OuDX(hr)please op Cage Activity Code Tone 0.T -X Operation slatyo" (Po®) EM Depth (100) 11/16/2018 11/16/2018 1.50 PRODt CASING PULD T 77U -new BHA#26, surface test (good- 1,123.3 1,172.4 08:33 10:03 test), stab INJH "' Note: Hanging weight 5,800 Ilbs 11/16/2018 11/16/2018 1.25 PROW CASING RUNL T RIH, w/upper liner segment 36 jts of 1,172.4 7,128.4 10:03 11:18 slotted liner, shorty deployment sleeve, and ported bullnose 11/16/2018 11/16/2018 0.15 PROD1 CASING RUNL T Correct to the EOP flag (minus 9.76) 7,128.4 7,128.4 11:18 11:27 11/16/2018 11/1612018 0.50 PROD1 CASING RUNL T Continued IH clean to TO 8603.4' 7,128.4 8,603.4 .11:27 11:57 '- Note: NPT time 5 him (BHI) 11/16/2018 11/16/2018 0.20 PROD1 CASING RUNL T Set down on bottom, PUW 36 k, bring 8,603.4 7,475.4 11:57 12:09 pump up to 1.5 bpm at 3,400 psi, 1019 psi differentual, PUW 32 k 11/16/2018 11/16/2018 1.00 PROD1 CASING TRIP T POOH, pumping across the top 7,475.4 44.2 12:09 13:09 11/16/2018 11/16/2018 0.70 PROD1 CASING PULD T Atsurface, check well for flow, LD 44.2 0.0 13:09 13:51 setting tools on a dead well. 11/16/2018 11/16/2018 0.60 PROD1 CASING CTOP T Perform a function test 0.0 0.0 13:51 14:27 11/16/2018 11/16/2018 0.65 PROD1 CASING PULD T Pi OH Anchored Billet and CoilTrak 0.0 73.4 14:27 15:06 toolst, MU UQC, surface test (good - test), Stab INJH, tag up, reset counter depths 11/16/2018 11/16/2018 1.46 PROD1 CASING TRIP T RIH, w/OH Anchored Billet BHA#27 73.4 7,095.0 15:06 16:30 11/16/2018 11/16/2018 0.20 PROW CASING DLOG T Log the K1 correction of minus 7.0', 7,095.0 7,119.0 16:30 16:42 - PUW 35 k, close EDC @ 7305.7' 11/16/2018 11/16/2018 0.20 PROD1 CASING TRIP T Continue IH 7,119.0 7,474.4 16:42 16:54 11/16/2018 11/16/2018 0.20 PROW CASING WPST T Set down on depth, PUH 32 k, bring 7,474.4 7,463.7 16:54 17:06 pump up to shear @ 3,100 psi, PUW 34 k 11116/2018 11/16/2018 1.30 PRODt CASING WPST T POOH, tag up, PJSM, flow check 7,463.7 73.0 17:06 18:24 11/16/2018 11/16/2018 070 PROD1 CASING PULD T LD BHA #26 73.0 0.0 18:24 19:06 11/16/2018 11/16/2018 0.90 PRODS STK PULD P PU BHA#27 KO/Drill Assembly 0.0 78.0 19:06 20:00 (agitator, 0.5° AKO motor, RB Hughes P104 bit), slide in cart, change out UQC checks, check pack -offs, good, MU to coil 11116/2018 11/16/2018 1.30 PRODS STK TRIP P RIH w/ BHA #28, shallow test at 78.0 7,090.0 20:00 21:18 500' (pipe vibrating significantly, though little to no read-out on transducer screen, possibly b/c pumping 11.8 KW) 11/16/2016 11/16/2018 0.10 PRODS STK DLOG P Log K1 for a-6.5' correction 7,090.0 7,120.0 21:18 21:24 11/16/2018 11/16/2018 0.30 PRODS STK TRIP P Continue RIH 7,120.0 7,288.0 21:24 21:42 11/16/2018 11/16/2018 0.80 PROD3 STK DLOG P Displace to PowerPro drilling fluid w/ 7,288.0 7,288.0 21:42 22:30 EDC closed, PUW = 32K 11/16/2018 11!16/2618 0.30 PR553 STK TRIP P Continue RIH, dry tag TOB @ 74623, 7,288.0 7,461.8 22:30 22:48 come up to milling rate„ PUW = 32K, tag 7461.8' pumping 11/1612018 11/16/2018 0.90 PRODS STK KOST P Milling off billet 1 fph for 1 ft, CWT = 7,461.8 7,462.8 22:48 23:42 18K, WOB=0.5K„BHP =3705 psi, WHP = 381 psi, 11/16/2018 11/17/2018 0.30 PRODS STK KOST P Go to 2 fph for 1 ft, CWT = 16K, WOB 7,462.8 7,463.4 23:42 00:00 = .1 K Page 33139 Report Printed: 11/20/2018 Aerations Summary (with Timelog . _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sial Tna Bet TIMDalh4 Pham Op Code ikinly Catle Tare P -T -x Operation Slat Depth (WB) Ertl Depth MO) 11/17/2018 11/17/2018 0.20 PROD3 STK -0-ST P Continue 2 fph for 1 ft 7,463.4 7,463.8 00:00 10GA2 11/172018 11117/2018 0.30 PRODS STK KOST P Go to 3 fph for 1', begin pushing on it 7,463.8 7,464.8 00:12 00:30 1 11/172018 11/17/2018 0.70 PRODS DRILL DRLG P Drilling, CWT = 3.5K, WOB = 1.5K, 7,464.8 7,584.0 00:30 01:12 BHP = 3684 psi, WHP = 322 psi, circ = 4791, 1.9 bpm in, 1.85 bpm out, pump 5x5 sweeps 11/172018 11/17/2018 0.20 PRODS DRILL WPRT P PUW = 35K, drift billet area up & 7,584.0 7,584.0 01:12 01:24 down, clean, RBIH 11/1712018 11/172018 1.80 PRODS DRILL DRLG P OBD, CWT= 15K, WOB= 1.4K, BHP 7,584.0 7,900.0 01:24 03:12 = 3680 psi, WHP = 245 psi, circ = 4900 psi, 1.9 bpm, pull 100' wipers every 100', towards planned 400' drill interval, pump 5x5 sweeps, Avg ROP = 175 fph PUW's = 36K -39K, capture transducer sceen off bottom 11/17/2018 11/17/2018 0.20 PRODS DRILL WPRT P Wiper up -hole, PUW =36K 7,900.0 7,500.0 03:12 03:24 11/17/2018 11/17/2018 0.20 PROD3 DRILL WPRT P Wiper in-hole, RIW = 15K 7,500.0 7,90G.0 03:24 03:36 11/17/2018 11/17/2018 0.70 PROD3 DRILL DRLG P Drilling, 1.9 bpm, FS = 1050 psi, CWT 7,900.0 8,000.0 03:36 04:18 = 13K, WOB = 2.5K, BHP = 3688 psi, WHP = 278 psi, circ = 5069 psi, continue 100' drilled & 100' wiper POW's = 37K 11/1712018 11/17/2018 0.15 PROD3 DRILL WPRT P 1 00'wiper up hole PUW 37 k 8,000.0 8,000.0 04:18 04:27 11/17/2018 11117/2018 0.70 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,758 psi, Diff=239 8,000.0 8,100.0 04:27 05:09 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/172018 11/1712018 0.15 PRODS DRILL WPRT P 100' wiper up hole PUW 37 k 8,100.0 8,100.0 05:09 05:18 11/17/2018 11/17/2018 0.42 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,782 psi, Diff=239 8,100.0 8,200.0 05:18 05:43 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2016 11/17/2018 0.15 FROM DRILL WPRT P 100' wiper up hole PUW 37 k 8,200.0 8,200.0 05:43 05:52 11/172018 11/172018 0.45 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,782 psi, Diff --239 8,200.0 8,300.0 05:52 06:19 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2018 72018 0.30 PRODS DRILL WPRT P 800' wiper up hole, PUW 37 k 8,300.0 7,500.0 06:19 06 7 06:3 11/17/2018 11/172018 0.20 PRODS DRILL WPRT P Wiper back in hole, RIW 11 k 7,500.0 8,300.0 06:37 06:49 11/17/2018 11/17/2018 0.65 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Diff -368 8,300.0 8,400.0 06:49 07:28 psi, WHP=323, BHP=3,754, IA=695, OA=688 11/17/2618 11/17/2018 0.15 PRODS DRILL WPRT P 1 00'wiper up hole PUW 3Tk 8,400.0 8,400.0 07:28 07:37 11/17/2018 11/1712018 0.65 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Diff -368 8,400.0 8,500.0 07:37 08:16 psi, WHP=323, BHP=3,754, IA=695, OA=688 /2018 11/178:16 11/17/2018 0.15 FR­OD3 DRILL WPRT P 100' wiper up hole PUW 37 k 8,500.0 8,500.0 0 08:25 11/17/2018 11117/2018. 0.60 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, Diff=368 8,500.0 8,665.0 08:25 09:13 psi, WHP=323, BHP=3,754, IA=695, OA=688 Page 34139 ReportPrinted: 11/2 012 01 8 Aerations Summary (with Timelog . .pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log. SleaTitre rsrtlTire DurlM P6ese 2ECode /ufivHyCetle TimeRT-X Operatlm Steri Depth (100), End Depth (110) 11/17/2018 11/17/2018 0.75 PROD3 DRILL WPRT P Wiper up hole inside pipe, w/5x5 8,665.0 7,315.0 09:13 09:58 sweep 11/17/2018 11/17/2018 0.60 PRODS DRILL WPRT P Continue pulling up hole, chasing 5x5 7,315.0 7,090.0 09:58 10:34 sweep, pump bottoms up. 11/17/2018 11/17/2018 0.20 PRODS DRILL DLOG P Log the K1 marker correction of (+05) 7,090.0 7,120.0 10:34 10:46 11/17/2018 11/17/2018 0.25 PRODS DRILL WPRT P RIH, perform static pressure survey 7,120.0 7,302.0 10:46 11:01 above window @ 7,302', close choke in 11.8 ppg, shut pump down, monitor annular pressure, 11.6 ppg, 11/17/2018 11/17/2018 0.40 PRODS DRILL WPRT P Continue wiper back in hole. RIW 11 7,302.0 8,665.0 11:01 11:25 k 11/17/2018 11/17/2018 0.70 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,815 psi, 8,665.0 8,765.0 11:25 12:07 Diff--1,039 psi, WHP=253, BHP=3,781, IA=697, OA=688 11/17/2018 11/17/2018 0.15 PRO53 DRILL WPRT P 100' wiper up hole POW 37 k 8,765.0 8,765.0 12:07 12:16 11/17/2018 11/17/2018 1.00 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 8,765.0 8,866.0 12:16 13:16 Diff-1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/171201811/17/2018 0.15 PROD3 DRILL WPRT P 100' wiper up hole POW 37 k 8,866.0 8,866.0 13:16 13:25 11/17/2018 11/17/2018 1.00 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 8,866.0 8,985.0 13:25 14:25 Diff=1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/17/2018 11/17/2018 0.15 PROD3 DRILL WPRT P 100' wiper up hole POW 37 k 8,985.0 8,985.0 14:25 14:34 - 11/17/2018 11/17/2018 1.00 PROD3 DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 8,965.0 9,065.0 14:34 15:34 Dift=1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/17/2018 11/17/2010 0.35 PRODS DRILL WPRT P 800', wiper up hole, PUW 37 k 9,065.0 8,265.0 15:34 15:55 11/17/2018 11/17/2018 0.35 -PROD3 DRILL WPRT P Wiper back in hole, RIW 15 k 8,265.0 9,065.0 15:55 16:16 11/17/2018 11/17/2018 1.74 PRODS DRILL DRLG P BOBD, 1.9 bpm at 4,877 psi, 9,065.0 9,216.0 16:16 18:00 Diff=1,119 psi, WHP=222, BHP=3,809, IA=701, OA=710 11/17/2018 11/17/2018 2.00 PROD3 D ILL DRLG P Crew change, BOBD, CWT =3.8K, FS 9,216.0 9,470.0 18:00 20:00 = 1098 psi @ 1.9 bpm, circ = 5220 psi, BHP = 3818 psi (11.8 EMW @ window), pump 5x5 sweeps 11/17/2018 11/17/2018 1.50 PRODS DRILL WPRT P Wiper to window, PUW=37K, MAD 9,470.0 7,300.0 20:00 21:30 pass 7500'-7320'@ 5 fpm (for resistivity) 11/17/2018 11/17/2018 0.50 PRODS DRILL DLOG P Obtain SBHP 7,300.0 7,300.0 21:30 22:00 Trap 11.87 ppg EMW (3,666 psi), MD = 7300', TVD-sensor = 5939.4', allow to drop to 3620' psi, bleed to 3602 psi, built back up to 3618 psi (EMW = 11.72 ppg) ' Seat mud pump #2 (Nabors 112 hour per tour used) 11/17/2018 11/17/2018 0.30 PRODS DRILL DLOG P Log RA for +2'correction 7,300.0 7,357.0 22:00 22:18 11/17/2018 11/17/2018 0.70 PROD3 DRILL TRIP P TD called, RBIH, confirm TD at 9470' 7,357.0 9,470.0 22:18 23:00 11/17/2018 11/18/2018 0.99 PRODS DRILL WPRT P Wiper to swab, PUW=37K 9,470.0 7,630.0 23:00 00:00 11/18/2018 11/18/2018 PROD1 7,630.0 00:00 00:00 Page 35139 ReportPrinted: 1112012018 -perations Summary (with Timelog _ .pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stettnme Endrin Di %use Op Code Ac Ay cede rine P -T-% OpaaYon Slam Depth (MM) Ed Depth (Po(B) 11/18/2018 11/18/2018 1.80 PRODS DRILL WPRT P Continue wiper to swab 7,630.0 78.0 00:00 01:48 11/18/2018 11/18/2018 1.30 PRODS DRILL WPRT P RBIH 78.0 7,090.0 01:48 03:06 11/18/2018 11/18/2018 0.20 PROD3 DRILL DLOG P Log Kt for -7' correction 7,090.0 7,124.0 03:06 03:18 11/18/2018 11/18/2018 0.10 PRODS DRILL WPRT P Continue RIH to 7300' 7,124.0 7,300.0 03:18 03:24 11/18/2018 11/18/2018 0.20 PRODS DRILL DLOG P SBHP: bleed to 3599 psi, MD bit = 7,300.0 7,300.0 03:24 03:36 1 7300', TVD_ sensor=5939',-15 min BHP at 3611 psi, 11.7 ppg EMW 11/18/2018 11/18/2018 0.90 PRODS DRILL WPRT P Continue RIH, RIW = 13K, confirm TD 7,300.0 9,473.0 03:36 04:30 at 9,473' 11/18/2018 11/182018 1.15 PROD3 DRILL TRIP P POOH, laying in 12.0 ppg beaded 9,473.0 7,315.0 04:30 05:39 LRP up to the window 11/182018 11/18/2018 0.90 PRODS DRILL TRIP P Continue POOH, displacing well to 7,315.0 6,645.0 05:39 06:33 12.0 ppg completion fluid. 11/18/2018 11118/2018 0.20 PRODS DRILL TRIP P Perform flow check before pulling to 6,645.0 6,645.0 06:33 06:45 surface (no -flow) 11/18/2018 11/18/2018 1.25 PRODS DRILL TRIP P Continue POOH 6,845.0 78.3 06:45 08:00 11/182018 11/182018 0.50 PRODS DRILL PULD P At surface, check well for flow (no- 78.3 78.3 08:00 08:30 flow) `"' Note: 8 bph loss rate 11/18/2018 11/18/2018 0.50 PRODS DRILL PULD P LD Drilling BHA on a dead well. 78.3 0.0 08:30 09:00 11/18/2018 11/18/2018 0.50 PRODS CASING PUTB P Prep RF for liner ops 0.0 0.0 09:00 09:30 11/182018 11/182018 2.75 PROD3 CASING PUTB P PU/MU 55 jts of slotted 2-3/8" liner, 0.0 1,750.7 09:30 12:15 MU Liner Top Billet, and non -parted bullnose. 11/18/2018 11/18/2018 0.50 PRODS CASING PUTB P RD liner running equipment 1,750.7 1,750.7 12:15 12:45 11/18/2018 11/18/2018 0.75 PRODS CASING PULD P PU/MU Coiltrak tools with blind sub, 1,750.7 1,795.3 . 12:45 13:30 slide cart forward, replace checks in the upper quick, check pac-offs (Change -out) 11/18/2018 11/18/2018 1.00 PRODS CASING RUNL P Tag up, reset counters, RIH 1.,795.3 7,202.0 13:30 14:30 11/18/2018 11/18/2018 0.15 PROD3 CASING RUNL P Correct to EOP (-7.64'), PUN/ 37 k 7,202.0 7,196.4 14:30 14:39 11/16/2018 11/18/2016 0.50 PROD3 CASING RUNL P Continue IH 7,196.4 9,078.0 14:39 15:09 11/18/2018 11/18/2018 0.45 PRODS CASING RUNL P Set down @ 9,078', PUW 39k, 9,078.0 9,473.0 15:09 15:36 continue to work pipe IH, continued RIH clean from 9, 108'to bottom. 11/18/2018 11/182018 0.15 PRODS CASING RUNL P Bring pump up 1.5 bpm, PUW 32 9,473.0 9,473.0 15:36 15:45 11/18/2018 11/18/2018 1.15 PRODS CASING TRIP P Pumping across the top, remove liner 9,473.0 44.2 15:45 16:54 length from counters, POOH 11/18/2018 11/18/2018 0.60 PROD3 CASING PULD P Check well for flow, PJSM, LD setting 44.2 0.0 16:54 17:30 tools on a dead well 11/18/2018 11/182018 1.20 PROD4 STK PULD P PU BHA#30 KO/Drill Assembly 0.0 78.0 17:30 18:42 (Agitator, 0.7" AKO, RB P104 bit), slide in cart, check pack -offs, good, MU to coil, tag up, set counters 11/18/2018 11/18/2018 1.30 PROD4 STK TRIP P RIH w/BHA #30, shallow test tools, 78.0 7,090.0 18:42 20:00 good 11/18/2018 11/182018 0.20 PROD4 STK DLOG P Log Kt for-8correction 7,090.0 7,120.0 20:00 20:12 Page 36139 Report Printed: 1112 012 01 8 Aerations Summary (with Timelog , pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK rime Log Smtl inns EIM Tone Dir(Or) Pham op Cope AcU*Cope Time P.T-x oWaUW am Npm (01(3) EM Depth dWB) 11/18/2018 11/18/2018 1.20 PROD4 STK DISP P Displace to PowerPro, PUW = 31K 7,120.0 7,300.0 20:12 21:24 11/18/2018 11/18/2018 0.80 PROD4 STK DLOG P Continue RIH, MAD pass fro 7550' up 7,300.0 7,550.5- 21:24 22:12 to 7350' 11/18/2018 11/1812018 0.40 PROD4 STK TRIP P RIH, dry tag TOB @ 7720', PUW = 7,550.0 7,719.8 22:12 22:36 35K, bring up rate, RBIH, begin milling @ 7719.6, PU to adjust TF 11/18/2018 11/18/2018 0.90 PROD4 STK KOST P Milling 1 fph for 1 ft, FS = 1080 psi @ 7,719.8 7,720.8 22:36 23:30 1.87 bpm, BHP = 3721 psi, WHP = 215 psi, circ = 5097 psi 11/18/2018 11/1912018 0.50 PROD4 STK KOST P Go to 2 fph for 1 ft 7,720.8 7,721.8 23:30 00:00 11/19/2018 11/1912018 0.30 PROD4 STK KOST P Go to 3 fph for 1 ft, begin pushing on it 7,721.8 7,722.8 00:00 00:18 @ 3'in 11/19/2018 11/19/2018 0.60 PROD4 DRILL DRLG P Drilling, 1.87 bpm, CWT= 14.3K, 7,722.8 7,800.0 00:18 00:54 WOB=.8K, BHP =3737 psi, WHIP= 207 psi, circ = 4964 psi, pump 5x5 sweeps, PUW = 38K 11/19/2018. 11/19/2018 0.10 PROD4 DRILL WPRT -F- Drift billet area up & down, slight WOB 7,800.0 7,800.0 00:54 01:00 bobble at 7720' PUH 11/19/2018 11/19/2018 2.00 PROD4 DRILL DRLG P Drilling, FS = 1100 psi @ 1.9 bpm, 7,800.0 7,963.0 01:00 03:00 CWT =I5K, WOB=1.7K, BHP= 3736 psi, WHIP = 202 psi, circ = 5190 psi, BHA wiper every 100', lower ROP beginning @ 7954' Holding 11.9 ppg for 1 -for -1, blow down MM, come down to 11.8 ppg & maintain 1 -for -1 11/19/2018 11/19/20181.00 PROD4 DRILL DRLG P Drilling, 1.9 bpm, BHP= 3713 psi, 7,963.0 8,000.0 03:00 04:00 WHIP= 187 psi, circe = 5104 psi, dp = 1313 psi, drilling through higherAPI interval w/ low ROP (-25 fph) 11/19/2018 11/19/2018 0.10 PROD4 DRILL WPRT P 100 ft Wiper, PUW = 38K, RIW = 15K 8,000.0 8,000.0 04:00 04:08 11/19/2018 11/19/2018 2.70 PROD4 DRILL DRLG P Drilling, FS = 1150 psi @ 1.9 bpm, 8,000.0 8,125.0 04:06 06:48 BHP = 3690 psi, WHIP = 163 psi, circ = 5022 psi 11/19/2018 11/19/2018 0.30 PROD4 DRILL WPRT P Wiper up hole to 7,400', PUW 40 k 8,125.0 7,400.0 06:48 07:06 11/19/2018 11/19/2018 0.30 PROD4 DRILL WPRT P Wiper back in hole, RIW 13.9 k 7,400.0 8,125.0 07:06 07:24 11/19/2018 11/19/2018 2.00 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, 8,125.0 8,171.0 07:24 09:24 Diff --1,098 psi, WHP=236, IA=702, OA=709 11/19/2018 11/19/2018 0.10 PROD4 DRILL WPRT p 200' wiper up hole, PUW 38 k 8,171.0 7,971.0 09:24 09:30 11/19/2018 11/19/2018 0.10 PROD4 DRILL WPRT P Wiper back in hole, RIW 12.8 k 7,971.0 8,171.0 09:30 09:36 11/19/2018 11/19/2018 1.40 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, 8,171.0 8,200.0 09:36 11:00 Diff --1,098 psi, WHP=236, IA=702, OA=709 11/19/2018 11/1912618 0.20 PROD4 DRILL WPRT P Wiper up hole to 7,909, PUW 39-k- 8,200.0 7,900.0 11:00 11:12 11/19/2018 11/1912018 0.20 PROD4 DRILL WPRT P wiper back in hole, RIW 9.8 k 7,900.0 8,200.0 11:12 11:24 11/19/2016 11/19/2018 0.25 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, Dift=984 8,200.0 8,210.0 11:24 11:39 psi, WHP=336, IA=702, OA=709 11/19/2018 11/19/2018 0.60 PROD4 DRILL WPRT P Wiper up hole to above window, PUW 8,210.0 7,090.0 11:39 12:15 38 k 11/19/2018 11/19/2018 0.20 PROD4 DRILL DLOG P Log the K1 marker correction plus 1.0' 7,090.0 7,126.0 12:15 12:27 Page 37139 Report Printed: 11/20/2018 perations Summary (with Timelog - _pths) 3H -13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Time 6q Tbrre D' (h') Ruse Op Cafe Aati�rily Catle 11me P -T -X Ope2don SM DepthSial lrn� End Depth lN®) 11/19/2018 11/19/2018 0.50 PROD4 DRILL WPRT P With bottoms up, RIH RIW 14.7 k 7,126.0 8,210.0 12:27 12:57 '"' Note: Set down 8,165' 11/19/2018 11/19/2018 1.25 PROD4 DRILL DRLG P BOBD, 1.9 bpm at 5,023 psi, Diff -984 8,210.0 8,243.0 12:57 14:12 psi, WHP=336, IA=702, OA=709 11/19/2018 11/19/2018 0.25 PROD4 DRILL WPRT P Wiper to the billet, PUW 37 k 8,243.0 7,740.0 14:12 14:27 Note: Called TO early do to hole conditions/150API 11/19/2018 11/19/2018 0.40 PROD4 DRILL WPRT P RBIH to 7,950', RIW 13.3 k 7,740.0 7,950.0 14:27 14:51 11/19/2018 11/19/2018 2.00 PROD4 DRILL WPRT P POOH chasing sweeps, performing 7,950.0 78.3 14:51 16:51 jogs @ 5,200', 3,200', and 517' 11/19/2018 11/1912018 1.15 PROD4 DRILL TRIP P Tag up, reset counter depths, RIH 78.3 7,090.0 16:51 18:00 11/19/2018 11/19/2018 0.15 PROD4 DRILL DLOG P Log the K1 correction of minus 8.0' 7,090.0 7,126.0 18:00 18:09 11/19/2018 11/19/2018 0.15 PROD4 DRILL CLOG P Perform Static Pressure Survey @ 7,126.0 7,300.0 18:09 18:18 7,300', 5,939' (TVD), 3,632 psi (11.76 ppg) 11/19/2018 11/19/2018 0.55 PROD4 DRILL TRIP P Continue IH off bottom @ 7,950', PUW 7,300.0 7,950.0 18:18 18:51 34 k 11/19/2018 11/19/2018 1.00 PROD4 DRILL TRIP P POOH, laying in 12.0 ppg beaded liner 7,950.0 5,500.0 18:51 19:51 running pill up into cased hole, 5,500', Painting EDP flags TD and above window 11/19/2018 11/19/2018 1.00 PROD4 DRILL TRIP P Continue POOH, displacing well to 5,500.0 78.3 19:51 20:51 12.0 ppg completion fluid 11/19/2018 11/1912018 0.50 PROD4 DRILL PULD P At surface, check well for Flow, PJSM 78.3 78.3 20:51 21:21 11/19/2018 11/19/2018 0.55 PROD4 DRILL PULD P LD drilling BHA on a dead well 78.3 0.0 21:21 21:54 11/19/2018 11/19/2018 0.45 PROD4 CASING PUTB P Prep rig floor for liner ops, PJSM 0.0 0.0 21:54 22:21 11/19/2018 11/19/2018 1.15 COMM CASING PUTB P MU AL1 -03 liner segment 22 its, 0.0 685.0 22:21 23:30 shorty deployment sleeve, and non - ported bullnose. 11/19/2018 11/20/2018 0.50 COMPZ4 CASING PULD P Begins PU Liner running tools BHA 685.0 685.0 23:30 00:00 #31 11/20/2018 11/20/2018 0.30 COMPZ4 CASING PULD P Complete PU Liner running tools BHA 685.0 730.0 00:00 00:18 #31, slide in cart, change out checks, MU to coil, tag up, set counters 11/20/2018 11/20/2018 2.90 COMPZ4 CASING RUNL P RIHw/BHA#31,-6.13'correction to 730.0 7,944.0 00:18 03:12 window flag, PUW = 35K, continue RIH to 7944', PUW = 40, RBIH, bring up pumps 1.55 bpm (dp = 1000 psi), release off liner, PUW = 34K, BOM = 7944', TOL- 7258' 11/20/2018 11/20/2018 0.30 C0MPZ4 EASING CLOG P Obtain SBHP (15 min): MD = 7243.6', 7,944.0 7,224.0 03:12 03:30 TVD sensor= 5927.3', Annular= 3667 psi, EMW = 11.91 ppg Note: EMW = 11.76 ppg on last SBHP wl9 ppg PowerPro in the well 11/20/2018 11/2012018 2.00 COMPZ4 CASING DISP P Open EDC, displace well to seawater, 7,234.0 2,500.0 03:30 05:30 POOH 11/20/2018 11/2012618 1.70 COMPZ4 CASING FRZP P Ffreeze protect from 2500'to surface, 2,500.0 44.0 05:30 07:12 POOH 11120/2018 11/20/2018 1.30 COMPZ4CASING PULD P PJSM, PUD & LD BHA#31 44.0 0.0 07:12 08:30 "SITP = 1180 psi, IA= 670 psi, OA= 482 psi Page 38139 Report Printed: 1112 012 01 8 perations Summary (with Timelog pths) 3H-13A Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Sfarlrma FiW rme o�0ej Phase oP code Asti yCode Thier-Tx ocean sed oepm MKS) 6a DeO (ram) 11/20/2018 11/20/2018 1.50 DEMOB WHDBOP RURD P Clear rig floor, MU nozzle, stab on, 0.0 0.0 08:30 10:00 flush stack, pop off, break-off nozzle, blow down surface lines, clear floor, Working RD checklist. 11/20/2018 11/20/2018 1.o0 DEMOB WHDBOP RURD P Remove UQC checks, work RD 0.0 0.0 10:00 11:00 checklist, vac out stack, freeze protect tree 11/20/2018 11/20/2018 1.00 DEMOB WHDBOP NUND P ND BOP 0.0 0.0 11:00 12:00 Rig Released: 11/20 12:00 hrs Page 39139 Report Printed: 11120/2018 �-I ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3H Pad 3H-13AL1-02 50-103-20089-62 Baker Hughes INTEQ Definitive Survey Report 07 December, 2018 BA,(ER 01 UGHES a GE company ConocoPhillips 6A RHES ConocoPhilli s Definitive Survey Report G i Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 31-1-13 Project: Kuparuk River Unit TVD Reference: 311-13A @ 71.00usft (31-1-13A) Site: Kuparuk 3H Pad MD Reference: 3H -13A @ 71.00usft (3H -13A) Well: 3H-13 North Reference. True Wellbore: 3H-13AL11-02 Survey Calculation Method. Minimum Curvature Design: 3H-13AL1-02 Database: EDT 14 Alaska Production Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 3H-13 Well Position +N/S 0.00 usft Northing: 6,000,475.46usft Latitude: 70° 24'45,119 N +E/ -W 0.00 usft Easting: 498,655.42usft Longitude: 150° 0'39.419 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3H-13AL1-02 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 0 0 (nn BGGM2018 11/1/2018 16.83 80.91 57,435 Design 3H-13AL1-02 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 7.456.57 Vertical Section: Depth From (TVD) +N/ -S -E/-W Direction (usft) (usft) (usft) (•) 71.00 0.00 0.00 0.00 17/7/2018 3A5'02PM Page 2 COMPASS 5000 14 Build 85D �. ConocoPhillips B"ucHe ri ConocoPhilli s T p Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 31-1-13 Project : Kupanuk River Unit Map ND Reference: 3H -13A @ 71.00usft (3H -13A) Vertical Site Kuparuk 3H Pad Inc MD Reference: 3H -13A @ 71.00usft (3H -13A) NDSB Well: 3H-13 North Reference: True Wellbore: 3H-13AL7-02 Survey Calculation Method: Minimum Curvature Design: 3H-13AL1-02 Northing Database: EDT 14 Alaska Production Section Survey Program (usft) Date V) (usft) (usft) From To IN) (ft) (°1100.) Survey (usft) (waft) Survey (Wellbore) Tool Name Description Start Date 95.00 5,900.00 31-1-13 (3H-13) GCT -MS Schlumberger GCT multishot 1/12/2001 6.113.56 7,260.49 3H-13AATDB(311-13A) MWD MWD - Standard 9/18/2001 7,315.00 7,396.26 3H-13AL1PB3 MWD-INC(3H-13AL1PB3 MWD-INC_ONLY MWD -INC -ONLY -FILLER 11/11/2018 7,426.34 7,456.57 3H-13AL1PB3 MWD(3H-13AL1PB3) MWD MWD -Standard 11/11/2018 7,462.00 7,495.22 31-1-13AL1-02 MWD-INC(3H-13AL1-02) MWD -INC ONLY MWD -INC -ONLY -FILLER 11/16/2018 7,525.98 9,428.65 3H-13AL1-02 MWD (3H-13AL1-02) MWD MWD -Standard 11/16/2018 Survey Survey End Data 11/11/2018 11/13/2018 11/16/2018 11/17/2018 Annotation TIP KOP Interpolated Azimuth 1217/2016 3:45r02PM Page 3 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc AidTVD NDSB +WS +E/ -W DLS Northing EasNng Section Survey Tool Name (usft) V) V) (usft) (usft) (usft) (usft) IN) (ft) (°1100.) (ft) 7,45657 9]82 46.59 5.992.74 -5,921.74 3,128.36 73731 6,003,603.64 497.918.75 49.04 3,12836 MWD (4) 7.462.00 97.35 49.21 5,99203 -5,921.03 3,131.97 -733.32 6,003,607.24 497,922,74 48.60 3,131.97 MWD -INC -ONLY (5) 7,495.22 95.93 47.00 5,968.19 5,917.19 3.154.00 408.76 6,003,62927 497,947.30 7.87 3.154.00 MWD -INC _ONLY (5) 7,525.98 93.47 46.89 5,985.67 -5,914.67 3.174.93 4gi6.36 6,003,650.19 497,969.70 8.01 3,174.93 MWD (6) 7,556.52 91.87 47,54 5,98424 -5,91324 3,195.65 -663.97 6,003.670.91 497,992.09 5.65 3,195.65 MWD (6) 7,591.18 8868 46.00 5,984.08 -5,913.08 3,219.38 63872 6003.694.64 498.017.34 10.22 3,219.38 MWD (6) 7,62226 8840 4496 5,984.87 -5,913.87 3,241.17 -61857 6,003,71841 498,039.50 3.46 3,241.17 MWD (6) 7,650.54 87.39 43.19 5,985.91 -5,914.91 3,261.47 -596,91 6.003.736.71 498.059.16 7.20 3,26147 MWD l6) 7,682.51 86.74 43.57 5,987.54 -5,916.54 3.284.68 574.98 6,003,759.91 498,081.09 2.35 3,28488 MWD (6) 7,712.59 86.56 44.07 5,989.30 -5,918.30 3.306.34 -554.19 6,003,781.57 498,101.88 1.76 3,306.34 MWD(6) 7,740.36 65.91 42.17 5,991.13 -5,920.13 3,326.57 -53525 6,003,801.79 498.120.82 7.22 3,326.57 MWD (6) 7,770.82 86.56 41.02 5.993.13 -5,922.13 3,349.30 -515.07 6,003,824.51 498.141.00 4.33 3.349.30 MWD (6) 7,800.89 85.27 40.52 5,995.27 -5,924.27 3.372.01 495.49 6,003,84122 498,160.59 4.60 3,37201 MWD(6) 7,83085 84.55 39.21 5,997,93 -5,926.93 3.394.92 476.36 6,003,870.12 498.179.72 4.97 3,39492 MWD (6) 7,86030 83.25 37.15 6,001.06 -5,930.06 3.417.93 458.26 6,003,893.13 498,197.82 8.24 3,417.93 MWD (6) 7,891.33 85.17 35.97 6,004.19 -5,933.19 3,44273 439.87 6.003.917.92 498.216.21 7.25 3,442.73 MWD(6) 7,92044 87.14 35.48 8,006.14 -5,935.14 3,466.31 422.91 6,003.941.50 498.233.17 6.W 3,466.31 MWD(6) Survey End Data 11/11/2018 11/13/2018 11/16/2018 11/17/2018 Annotation TIP KOP Interpolated Azimuth 1217/2016 3:45r02PM Page 3 COMPASS 5000.14 Build 85D Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 31-1-13 Project: Kuparuk River Unit TVD Reference: 31-1-13A @ 71.00usft (31-1-13A) Site: Kupamk 3H Pao MD Reference: 31-1-13A @ 71.00usft (3H -13A) Well: 31-1-13 North Reference: True Wellbore: 31-1-13AL1-02 Survey Calculation Method: Minimum Curvature Design: 3H-13AL1-02 Database: EDT 14 Alaska Production Survey 12/712018 3'45:02PM Page 4 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azl TVD TVDSS +N/-S+FJ-W DLS (ustt) (°) (°) (ustt) (ustt) Wait) (usft) Northing Easting Section Survey Tool Name Annotation (ft) (ft) IN) 7.951.34 89,08 34,31 6,007.16 -5.93616 3.49164 405.25 6,003.966.82 498.250.84 783 3,491.64 MWD (6) 7,980.51 89.63 33.63 6.007.49 -5,936.49 3,515.83 -388.95 6003,991.00 498,267.14 3.00 3,515.83 MWD (6) 8,011.23 91 Al 3208 6,00T21 -5,936.21 3,541.63 -372.29 6,004,016.80 498,283.81 7.68 3,541.63 MWD(6) 8,04150 93.66 31.26 6,005.87 -5,93087 3.567.36 356.41 6,000.042.53 498.299.69 T.91 3,567.36 MWD (6) 8,071.13 93.72 29.38 6.003.96 -5,93296 3,59289 -341.48 6,004.06805 498314.62 6.34 3,592.89 MWD (6) 8,10192 94.09 28.60 6,001.86 -5,930.86 3.619.76 -326.60 6,004,09491 498.329.51 2.80 3,619.76 MWD(6) 8,13078 94.06 28.34 5,999.81 -5,928.81 3,645.30 -313.32 6,004,120.45 498,342.79 7.81 3.645.30 MWD (6) 8.162.12 93.47 24.12 5,997.76 -5,926,76 3,673.58 -299.99 6,004,148.73 498,356.12 781 3.673.58 MWD (6) 8,19155 91.50 21.18 5.996.48 -5,925.48 3,70051 -28867 6,004,17586 498,36745 12.02 3,700.71 MWD (6) 8,220.67 91.26 21.30 5.995.78 -5,924.78 3,72785 -278.12 6,004,202.98 498,378.00 0.92 3,727,85 MWD (6) 8,25029 90.89 20.13 5,995.22 -5,924.22 3,75555 -26765 6.004,23068 498.388.48 4.14 3,755.55 MWD (6) 8,281.14 89.69 17.88 5,995,07 -5,924.07 3,784.71 -257.60 6,004,259.84 498,398.53 8.27 3,78071 MWD (6) 8,310.76 88.92 15.38 5,995.43 -5,924.43 3,813.09 -249.13 6,004,28821 498,407.01 8.83 3,813.09 MWD (6) 8,341.04 90.09 13.63 5,995.69 -5,924.69 3,84240 -24154 6,004,317.52 498,414.59 6.95 3,842.40 MWD (6) 8,371.07 92.03 12.98 5,995.13 -5,924.13 3,871.62 .234.63 6,004,346.73 498,421.51 6.81 3,871.62 MWD (6) 8,400.94 93.96 11.37 5,993.57 -5.922.57 3,900.77 -228.34 6,004,375.89 498,427.80 8.41 3,900.77 MWD (6) 8,430.82 94.18 10.19 5,99145 -5,920.45 3,930.05 -222.77 6,004,405.16 498,433.38 401 3,930.05 MWD (6) 8.460.77 94.30 8.88 5,989.24 -5,916.24 3,959.51 -217.82 6,004634.61 498,438.33 4.38 3,959.51 MWD (6) 8,490.65 93,84 7.50 5,987.11 -5,916.11 3,989.01 -213.57 6,004,464.11 498,42.59 4.86 3,989.01 MWD (6) 8,520.82 93.04 6.31 5,985.30 -5,91430 4,018.90 -209.95 6,004.494.00 498.446.21 475 4,018.90 MWD (6) 8,551.02 93.04 5.03 5,983.70 -5,91270 4,048.91 -206.97 6,004.524.01 498,449.20 4.23 4,046.91 MWD (6) 8,581.60 92.70 3.89 5,982.17 -5,911.17 4,079.36 -204.60 6,004,55945 498.451.58 3.89 4,079.36 MWD (6) 8,612.14 91.78 0.40 5,980.98 -5.909.98 4,109.85 -20346 6,004,584.94 498,452.72 11.81 4,109.85 MWD (6) 8,640.33 91.04 358,90 5.980.28 -5,909.28 4,138.03 -203.63 6,004,613.11 498,452.56 5.93 4,138.03 MWD (6) 8,671.18 88.19 354.48 5,98049 -5,909.49 4,16882 -205.41 6,004,643.90 49645078 17.05 4,168.82 MWD (6) 8,70053 8748 351.43 5,981.60 -5,910.60 4,197.92 -209.01 6,004,673.00 496447.19 1066 4,197.92 MWD (6) 8,731.00 88.86 350.81 5,982,57 -5,911.57 4.228.01 -213.71 6,004,703.09 498.44249 4.96 4,228.01 MWD (6) 8765.77 87.45 349.05 5,983.69 -5,912.69 4,26223 -219.78 6,004.737.30 496436.43 6.48 4,262.23 MWD (6) 8.791.14 86.58 34776 5.985.01 -5,914.01 4,287.04 -224.88 6,004,762.12 498,431.34 6.13 4,28704 MWD (6) 8.822.81 87.26 34587 5.98672 -5.915.72 4.317.83 -232.09 6,004,792.90 498,424.13 6.33 4,317.83 MWD (6) 8.851 A3 8677 34362 5.988.21 -5.91721 434540 -239.61 6,004,820.47 498,41662 8.04 4345.40 MWD(6) 12/712018 3'45:02PM Page 4 COMPASS 5000.14 Build 85D ConocoPhillips SA ER ES 0 ConocoPhilli 5 UGH p Definitive Survey Report - Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Co-ordinate Reference: Well 3HA3 Project: Kuparuk River Unit TVD Reference: 3H -13A @ 71.00usft (3H -13A) Site Kuparuk 3H Pad MD Reference: 3H -13A @ 71.00usft (3HA 3A) Well: 31-1-13 North Reference: True Wellbore: 3HA21AL1-02 Survey Calculation Method: Minimum Curvature Design: 31-1-13AL1-02 Database: EDT 14 Alaska Production Survey 12/7/2018 3:45:02PM Page 5 COMPASS 5000 14 Build 85D Map Map Vertical Inc Azi TVD TVDSS -N/-S +E1 -W DLS - (usft) Wait) (°) (') (usft) (usft) (usft) usft) Northing Ea sting (°1100' Section Survey Tool Name Annotation 8,880.17 86.19 342.07 5,989.47 -5,91847 4.37284 -248.08 6,004,847.91 496408.16 7.31 4,372.84 MWD (5) 8.911.19 8932 339.47 5,990.14 -5,919.14 4.402.12 -258.29 6,004,877,18 498,39795 9.14 4,402.12 MWD (6) 8.941.94 88.40 33805 5,990.76 5,91976 4.430.77 -269.43 6,004,905.84 498,38682 5.50 4,430.77 MWD (6) 8.972.18 89.39 339.22 5,991.34 -5,920.34 4458.93 -280.44 6,004,933,99 498.37581 5.07 4,456.93 MWD (6) 9,000.11 90.00 341.68 5,991.49 5,920.49 4,48525 -289.79 6,004,960.31 498,366.47 9.07 4,48525 MWD (6) 9,029.64 90.95 342.07 5,991.24 -5,920.24 4.513.31 -298.97 6,004,988.37 498.35129 3.48 4,513.31 MWD (6) 9,061.02 92.21 34034 5,990.38 -5.91938 4.54300 -309.08 6,005,018.06 498.347.19 6.82 4,543.00 MWD (6) 9,090.54 92,83 339.87 5.989.08 -5,916.08 4,570.73 -319.11 6,005,045.79 498.337.16 2.63 4,570.73 MWD (6) 9,120.62 93.81 339.51 5,987,34 -5,916.34 4.598.90 -329.54 6,005,073.95 498.326.74 347 4,598.90 MWD (5) 9,150.05 90.25 340.83 5,986.30 -5,91530 4,626.56 -339.51 6,005,101,62 498.316.77 12.90 4,628.56 MWD (6) 9,17767 8969 339.71 5,986.31 -5,915.31 4,652.46 -348.80 6,005,127.52 498,307.49 4.55 4,652.46 MWD(6) 9,210.69 89.29 341.32 5,98660 -5.915.60 4,683.68 -359.85 6,005,158.74 498,296.45 5.01 4,68368 MWD (6) 9,243.60 87.20 341,81 5,987.61 -5,916.61 4.714.89 -370.25 6,005,189.94 498.286.05 6.52 4.714.89 MWD (6) 9,270.46 8732 342.63 5.98890 -5,917.90 4,740.44 -378.44 6,005,215.49 498,2778T 308 4,740.44 MWD (6) 9,301.22 8600 343.39 5,990.15 5,919.15 4.769.83 -38742 6,005,244.88 498,268.89 3.31 4,769.83 MWD (6t 9,330.49 87.61 343.48 5,991.27 -5,92027 4,797.86 -395.76 6,005,272.91 498,260.56 1.37 4,797.86 MWO(6) 9,360.56 86.28 34.76 5,992.88 -5,921.86 4,826.74 403.98 6,005,301.79 498,252.35 6.13 4,826.74 MWD (6) 1 9,395.63 8702 346.79 5,994.93 -5,923.93 4,860,68 412.58 6,005,335.72 498.24375 6.15 4,860.68 MWD (6) 9,428.65 8846 349.02 5,996.23 -5,925.23 4,892.94 419.49 6,005,367.98 498.23685 8.03 4,892.94 MWD (6) 9673.00 88,46 349.02 5,997.42 -5,926.42 4,93646 427.94 6,005,411.60 498.228.41 0.00 4,936.46 PROJECTEDto TD 12/7/2018 3:45:02PM Page 5 COMPASS 5000 14 Build 85D BAYUCHE PRINT DISTRIBUTION LIST a GE company COMPANY ConocoPhillips Alaska, Inc. WELL NAME 3H-13AL1-02 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider(o�bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 90X) PERSON ATTENTION V 1 RP North Slope. EOA, PBOC, PRB-20 (Office 109) D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. .Anchorage, Alaska 99508 2 ConocoPhillkps Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 3 F.xxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC �Attn: Natural Resources Technician If 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR -Division of0d & Gas *** Arta: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd Anchorage, Alaska 99508 v_ 21 8137 30115 a sign and return one copy of this transmittal form to: coPhillips Alaska, Inc. Osterkamp (WNS Petroleum Technician) i Street. orage, Alaska 99510 data. LOG TYPE GR - RES LOG DATE November 19. 2018 TODAYS DATE December 11, 2018 Revision Details: Rev. Requested by: --- FIELD/ FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRIN i X Ur PRIN # OF COPIES # OF COPIES I# OF COPIES 4 4 IX OGGG P 0 0 0 10 0 0 1 1 1 1 1 0 p 0 1 0 1 1 1 0 0 0 1 0 1 1 0 0 TOTALS FOR THIS PAGE: 0 1 3 0 0 BT�aGEcompany ER GHES As Date: December 7, 2018 Abby Bell AOGCC 333 West 7`^ Ave, Suite 100 Anchorage, Alaska 99501 218137 Letter of Transmittal Michael Soper Baker Hughes, a GE Company 795 East 94`^ Avenue Anchorage, Alaska 99515 find enclosed the directional survey data for the following well(s): 3H-13AL1PB1 3H-13AL1PB2 3H-13AL1-01PB1 3H-13AL1PB3 3H-13AL1 3H-13AL1-02 3H-13AL1-03 (7) Total prints DEC 10 2018 AOGCC Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Note: Please feel free to send us an email in place of return mail. Michael Soper, Baker Hughes, Applications Engineer Michael.SoperCa@BakerHuehes.com ConocoPhillips ConocoPhillips (Alaska) Inc. -Kup2 Kuparuk River Unit Kuparuk 3H Pad 3H-13AL1-02 60-103-20089-62 Baker Hughes INTEQ Definitive Survey Report 07 December, 2018 218137 30083 BA ER (� F�UGHES a GE company ConocoPhillips ConocoPhillips Definitive Survey Report Company: Conocc Phillips(Alaska) Inc.-Kup2 Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 3H Pad MD Reference: Well: 31-1-13 North Reference: Wellbore: 31-1-13AL1-02 Survey Calculation Method: Design: 31-1-13AL1-02 Database: Well 3H-13 3H -13A @ 71.00usft (3H -13A) 3H -13A (off 71.O0usft (3H -13A) True Minimum Curvature EDT 14 Alaska Production Project Kuparuk River Unit, North Slope Alaska, United Stales j Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well 3H-13 Well Position +N/ -S 0.00 usft Northing: 6,000,475.46usft Latitude: y 70° 24'45.119 N f +E/ -W 0.00 usft Elating: 498,655.42usft Longitude: 150" 0'39.419 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: fI 0.00 usft # Wellbore 3H-13AL1-02 _ t Magnetics Model Name Sample Date Declination Dip Angle 1 Field Strength (1) r) (nn BGGM2018 11/1/2018 16.83 80.91 57,435 I --U Design 3H-13ALL02 Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 7,456.57 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction j (usft) (usft) (usft) (•) 1 d 71.00 0.00 0.00 0.00 I 12/72018 3:45:02PM Page 2 COMPASS 5000.14 Build 85D ConocoPhillips RA ER UGH ConocoPhillips Definitive Survey Repo S Company: ConocoPhillips (Alaska) Inc. -Kup2 Local Coordinate Reference: Well 3H-13 .� Project: Kuparuk River Unit TVD Reference: 3H -13A @ 71.00usft (3H -13A) Vertical Site: Kuparuk 3H Pad MD Reference: 3H -13A @ 71.00usft (3H -13A) TVD j Well: 31H-13 North Reference: True DLS Section Wellbore: 311-13AL1-02 Survey Calculation Method: Minimum Curvature (0) (usR) Design: 3H-13AL1-02 Database: EDT 14 Alaska Production (°1100') Survey Program Date Annotation From To Survey Survey (usR) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 95.00 5,900.00 31-1-13 (3H-13) GCT -MS Schlumberger GCT multishot 1/12/2001 6,003,60364 6,113.56 7,260.49 3H-13AATDB(3H-13A) MWD MWD -Standard 9/18/2001 7,462.00 7,315.00 7,396.26 3H-13AL1PB3 MWD-INC(3H-13AL1PB3 MWD -INC -ONLY MWD -INC -ONLY -FILLER 11/11/2018 11/11/2018 7426.34 7,456.57 3H-13AL1PB3 MWD(3H-13ALIPB3) MWD MWD -Standard 11/11/2018 11/13/2018 7462.00 7,495.22 3H-13ALl-02 MWD-INC(3H-13AL1-02) MWD-INC_ONLY MWD -INC -ONLY -FILLER 11/16/2018 11/16/2018 j 7,525.98 9,428.65 3H-13AL1-02 MWD(3H-13AL1-02) MWD MWD - Standard 11/16/2018 11/17/2018 3Cp Interpolated Azimuth 7,525.98 93.47 46.89 5,965.67 5,914.67 Survey 121712018 3:45:02PM Page 3 COMPASS 5000.14 Build 85D Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +EI -W Northing Seating DLS Section Neff) 0 (0) (usR) Waft) (usR) (usR) (°1100') Survey Tool Name Annotation (ft) (R) (ft) 7,456.57 97.82 46.59 5,992.74 5,921.74 3,128.36 -737.31 6,003,60364 497,918.75 49.04 3,128.36 MV/D(4) TIP 7,462.00 97.35 49.21 5,992.03 5,921.03 3,131.97 -733.32 6,003,607.24 497,922.74 48.60 3,131.97 MWD-INC_ONLY (5) KOP 7,495.22 95.93 47.00 5,988.19 5,917.19 3,154.00 -708.76 6,003,62927 497,947.30 7.87 3,154.00 MWD -INC ONLY (5) Interpolated Azimuth 7,525.98 93.47 46.89 5,965.67 5,914.67 3,174.93 686.36 6,003,650.19 497,969.70 8.01 3,174.93 MVID(6) 7,556.52 91.87 47.54 5,98424 -5,913.24 3,19565 663.97 6,003,670.91 497,992.09 5.65 3,195.65 MWD (6) 7,591.18 88.68 1600 5,964.08 5,913.08 3,219.38 638.72 6,003,694.64 498,017.34 10.22 3,219.38 MWD(6) 7,622.26 88.40 44.96 5,984.87 5,913.87 3,241.17 616.57 6,00$716.41 498,039.50 3.46 3,241.17 MWD(6) 7,650.54 87.39 43.19 5,985.91 5,914.91 3,261.47 -596.91 6,003,736.71 496,059.16 7.20 3,261.47 MWD (6) 7,682.51 86.74 43.57 5,987.54 -5,916.54 3,284.68 -574.98 6,003,759.91 498,081.09 2.35 3,28468 MWD (6) 7.712.59 86.56 44.07 5,989.30 -5,918.30 3,306.34 -554.19 6,003,781.57 498,101.86 1.76 3,306.34 MWD(6) 7,740.36 85.91 42.17 5,991.13 -5,920.13 3,326.57 535.25 6,003,801]9 498,120.82 7.22 3,326.57 MWD (6) 7,770.82 86.56 41.02 5,993.13 -5,922.13 3,349.30 515.07 6,003,824.51 498,141.00 4.33 3,349.30 MWD (6) j 7,800.89 85.27 40.52 5,995.27 -5,924.27 3,372.01 495.49 6,003,847.22 498,160.59 4.60 3,372.01 MWD (6) jy 7,830.85 84.55 39.21 5,997.93 -5,926.93 3,394.92 476.36 6,003,870.12 498,179.72 4.97 3,394.92 MWD (6) 7,850.30 83.25 37.15 6,001.06 -5,930.06 3,417.93 -458.26 6,003,893.13 498,19782 8.24 3,417.93 MWD(6) 7,891.33 85.17 35.97 6,004.19 -5,933.19 3,442.73 -039.87 6,003,917.92 498,216.21 7.25 3,442.73 MWD(6) 7,920,4 87.14 35.48 6,006.14 -5,935.14 3,466.31 422.91 6,003,941.50 498,233.17 6.97 3,466.31 MWD (6) 121712018 3:45:02PM Page 3 COMPASS 5000.14 Build 85D y=� a m 4 a O M O W p c I III E E z o I sees SS m m io m m m io io m �? m m m' �o �p a� m is u m ipso a -0-0-0 � m � A m N n 0 NN� V N O O) 0 G m Q O N S W P Q Q 10 U Oi N 1p �Mp p y yy' 0 O M N Ips N O n Q Q? M Cml M O Im•1 Oi N N N^ p Y41 N N tD 0 1p IM1 n A 0�1 O p -i > m M Cl lh (h M M m m m m m m m lh 1+1 < V V P P P P 4 Y Q Y< m n T ty m m m o in No m N m m m 'v r'Sm b N r P N O V... mO 0 Q P Q V< IM OO Q m f0 1G (O 2 Q Q J P n] f f 0 m N f m n �p m OI OI M P M N IMO fOV > M M f� W 6 C ^N N N N t7 M N y C M m aV m m m T N m 0 mm m m mm m 0 0 Ol Q 0 Q N N N Oml m Omi mm m 0 Q Omi I p O. 1 Y O m S 0) N O Oi O r 0 p p bp m CI N I� a) tD, O O P T T p O O m dOi, o m ry�ry p y p� O p �p O M P P Ny N4, 10 1VV0 M W n' _ i O q O S y O O O g [� �' S S Np N S S p S O y y 0 p 00 00 S$ ,Q ,yQ O S y O Op y y Op 00 O O �R S S S E o m m m m 16 � 16 16 16 i6 to to to cu cd cd e a � lc lti i6 e e � � � � � ^ � T m N � t4 CJ Oi m lV 1� m m N O Q O O O O pS� m m N Q N o> � i � � 'J• � $ (� Cj t? 1�1 � � • � N N N N N N N N N N • • i i i � � N f o S oui 5 Z N 0m 1 10 W 1p0 0 pp n M p N r O N t� O Op � r y10� Oq mpt� 0 T O N1y O m O �m 8 p 2 S p O p q o f 8 N ry N N T C V N N N N m m 10 m m m Ol O� Ol O S M m N N N N m a; m `m $i m 8 m L9 m p m m m Si m m m m _ m m m rn m m m rn V h N Y7 N Yl h N � � � � � Vl N 0 N N Yr N N •(r N N •N 9 4 Y7 N pN U � V N m 10 (p Ip N N N N N h h N N N N •N N UI N N N N N N N YI C m �• M m �p mm V 10 � m p pp � p � mm m m W CI 0 0 P m P O m O A 0 V) O a tM0 2 O M N m N �1�p7p N N (•1 m N C'1 t2 V m YO] N m N m N^ G � M N N N M m m n d a Z o 0 8 2 2 M MG '8 M 8 8 8 v S 4 m .p m S 8 18, R 8 8 8 o n S R' o, e N 1I o; m m m fO U Y Y OJ• �jO N N � 0 W � YI to0 �� fpNU 0 O 100 � 1st � N O r C �y p O (•! ry 10 Ol ON VV p m Q ... N p 8 m 0 C .. m .. 0 O� O m m N N N M M. P 4_ m m IM1 lc m vm i m mm m m m m m m m m m a m 4 a O M 0 m fi m' Qo 0 7i m � o c a a Q � O U v ' E v z � 0 0 0 H U Ngggggg���g��gg�g�g�a m � Ips N� O r m M m 0 P m m e m N� M bm NV y Ih Q ' P Cat Y V so P O Y N N N q N� N t0 fmr0 r 0� m mp d y O P O O Z m J 0 I� Oi VI VI {OO lV C) N < (O CI C] r t0 10 OI O r r J Yq 0 M E S m of m - m N N N N wpm m e m 171 �+ Ct m m Ct m N N m m m m m� ;; i m v w e P Q v v v v v e v v v e e v v i m t v m em m m `8 n m io n� m m n m m m� N YI y N m l� LL' i C O S 00 O o 0 0 O s O 0 a U `u m C V n m m e e n m o$ in m m o n m v m d' m t m a ati m m o of lmv m m rti 6 oe ca' ImJ of N m c? JF� 2 0O }� pp m g r ONI N m O I� po �p P N O m m Q m m m r 10 Oel O C� P O N b m m n 0 m m �i Q P N N Omi } v Q e m P N m O OI m � r m� N 0 % m A OI Oi OI Ifl Ip (O IU N VI VI f0 N I� Oi O m N g m m m lmV m N N m m m `m rn m Yl N 19 p r m Iel P N m 0 A m m m pN V N m m N Q (D m V v m N N N h m m N N N N N m m N N qC Y N m m rl m m n o°i m d m d N N lyi lyi x 4 l p a N J J O m m m �y p C! e m p O m CI mm y� m N Imo N N (V l7 O ry O (p N O 1p Y P C m m m m m m m m m$ m m m rm m rm m rm m m U Y44 Y M lti of = a N O r_ m e m �_ b NO�p pp N yy�� IpNpp O N m� P IIpp N OO mo�y� Y� p p r 1p O Q Q M C .. O lel 0 0 0 f N N N m lC (ml tml d y E T �� m m m m m m Oi T Oi pi m 0 li li Oi q pi m m m {�y THE STATE °fALASKA GOVERNOR BILL WALKER James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3H-13AL1-02 ConocoPhillips Alaska, Inc. Permit to Drill Number: 218-137 Surface Location: 1182' FNL, 281' FWL, SEC. 12, T12N, R8E, UM Bottomhole Location: 966' FNL, 5204' FEL, SEC. 01, TI 2N, R8E, UM Dear Mr. Ohlinger. 333 West 7th Avenue Anchorage, Alaska 99501 Main: 907.297.1433 Fax: 907.276.7542 www.aogcc.alaska.gov Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 196-197, API No. 50-103-20089- 01-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. ST DATED this3 � day of October, 2018. Sincerely, Daniel T. Commissioner STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 9n AAr- og ring 1a. Type of Work: Drill ❑ Lateral ❑Q Redrill ❑ Reentry 01 1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG Service - Disp ❑ Stratigraphic Test ❑ Development - Oil ❑� ' Service - Winj ❑ Single Zone Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ tc. Specify if well is proposed for: Coalbed Gas ❑ Gas Hydrates ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 5. Bond: Blanket ❑✓ • Single Well ❑ Bond No. 5952180 11. Well Name and Number: KRU 3H-13AL1-02 ' 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 6. Proposed Depth: MD: 10000' TVD: 6060' 12. Field/Pool(s): Kuparuk River Field! Kuparuk River Oil Pool ' 4a. Location of Well (Governmental Section): Surface: 1182' FNL, 281' FWL, Sec 12, T12N, R8E, UM Top of Productive Horizon: 3368' FNL, 465' FEL, Sec 02, T12N, R8E, UM Total Depth: 966' FNL, 5204' FEL, Sec 01, T12N, R8E, UM 7. Property Designation: ADL 25531 8. DNR Approval Number: LONS 84-134 & LONS 84-149 13. Approximate Spud Date: 10/24/2018 9. Acres in Property: 2560 14. Distance to Nearest Property: 6630' 4b. Location of Well (State Base Plane Coordinates - NAD 27): Surface: x- 498655 y- 6000475 Zone- 4 10. KB Elevation above MSL (ft): 76' GL / BF Elevation above MSL (ft): 34' 15. Distance to Nearest Well Open to Same Pool: 156,31-1-13A 16. Deviated wells: Kickoff depth: 7430 • feet Maximum Hole Angle: 95 degrees 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Downhole: 4897 • Surface: 4299 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling I Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 2350' 7650' 6005' 10000' 6060' Slotted 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MO (ft): Effect. Depth TVD (ft): Junk (measured): 7755' 6203' N/A 7653' 6150' N/A Casing Length Size Cement Volume MD TVD Conductor/Structural 74' 16" 245 sx AS 1 110' 110' Surface 3037' 9-5/8" 1300 sx ASII I, 400 sx G, 70 sx ASI 3072' 2929' Production 5937' 7" 300 sx G, 175 sx AS 1 5970' 5173' Liner 1947' 3-1/2" 311 sx G 7755' 6203' Perforation Depth MD (ft): 7229'- 7249', 7258'- 7308' Perforation Depth TVD (ft): 5927'- 5938', 5943'- 5969' 7356' - 7366', 7372' - 7380' 5994'- 6000', 6002'- 6007' Hydraulic Fracture planned? Yes❑ No P 20. Attachments: Property Plat ❑ BOP Sketch Diverter Sketch e Drilling Program B Time v. Depth Plot B Shallow Hazard Analysis Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements e✓ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Keith Herring Authorized Name: James Ohlinger Contact Email: Keith. E.Herrin c0 .Com Authorized Title: Staff CTD ngineer Contact Phone: 907-263-4321 Authorized Signature: Date: 101:2-1pCo Commission Use Only Permit to Drill Number: ($--13* API Number: 50-fo3^BOO-'6s't^ Permit Approval Date: See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 19, Other: B670 7-t,5 j- /V - fb 00 PS � .1., Samples req'd: Yes ❑ No&' Mud log req'd: Yes ❑ No [y Directional svy req'd: Yes [ErNo❑ r, V1 Lzr 7" I—f ✓f✓>' %"lr S t 7b 1 ✓5�a measures: Yes [r No[-] Directional {rR%- /`c!•f9 G Y �'2'J a D ,1}f}L' zS, �/ Jit b�g Pbon req'd: Yes ❑ No L7 Inclination -only svy req'd: Yes ❑ No, §-_ �S pr�n�Cd 1n Post initial injection MIT req'd: Yes[] Nog J )to a{lo r,1-thr kr �447FF O/tri f- ✓� bG I -Yt«a APPROVED BY / Q Approved by: COMMISSIONER THE COMMISSION Date: d Q� �� 1 /r �T�oni tlb-401 Revised 5/2017 This pemtit is a I or h o h Submit Form and el per 20 AAC 25.QA5(g) , Attachments in 13mlirate Qq A05atot 18 ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 October 23, 2018 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the KRU 3H -13A (PTD# 196-197) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin on October 24, 2018. The objective will be to drill four laterals KRU 3H- 13AL1, 31-1-13AL1-01, 3H-13AL1-02 and 3H-31AL1-03 targeting the Kuparuk A -sand interval. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10-401) for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 - Detailed Summary of Operations - Directional Plans for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 - Current wellbore schematic - Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-263-4321. Sincerely, Keith Herring Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 31-1-13AL1, 3H-13AL1-01, 31-1-13AL1-02, & 31-1-13AL1-03 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary.......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2))..................................................................................................................................................2 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program.................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 7. Diverter System Information.......................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis............................................................................................................................. 4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................ 4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding...................................................................................................................... 4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................5 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))......................................................................................................................................................6 16. Attachments....................................................................................................................................6 Attachment 1: Directional Plans for 31-1-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 3H-13AL1-03 laterals ..........................6 Attachment 2: Current Well Schematic for 3H-13A.........................................................................................................6 Attachment 3: Proposed Well Schematic for 3H-13AL1, 31-1-13AL1-01, 3H-13AL1-02, & 31-1-13AL1-03 laterals ............6 Page 1 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 31-1-13AL1-03 1. Well Name and Classification (Requirements of 20 AAC 25.005(o and 20 AAC 25.005(b)) The proposed laterals described in this document are 3H-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, and 31-1-13AL1 03. The laterals will be classified as "Development -Oil' wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 31-1-13AL1, 31-1-13AL1-01, 3H-13AL1-02, and 31-1-13AL1-03. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,800 psi. Using the maximum formation pressure in the area of 4,897 psi in 31-1-22 (i.e. 15.5 ppg EMW), the maximum potential surface pressure in 31-1-13A, assuming a gas gradient of 0.1 psi/ft, would be 4,299 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3H -13A was measured to be 2,567 psi (8.3 ppg EMW) on 9/16/2015. The maximum downhole pressure in the 3H -13A vicinity is the 3H-22 at 4,897 psi (15.5 ppg EMW) measured on 6/17/2018. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) 11 The offset injection wells to 3H -13A have injected gas, so there is a possibility of encountering free gas while drilling the 31-1-13A laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 31-1-13A laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 3H -13A laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 3H-13AL1 7,750' 10,600' 5,932' 5,935' 2-3/8", 4.7#, L-80, ST -L slotted liner; 0' 110' 1640 670 Surface aluminum billet on to 3H-13AL1-01 7,430' 10,600' 5,940' 5,900' 2-3/8", 4.7#, L-80, ST -L slotted liner; 2929' 3520 2020 Production 7" aluminum billet on to 3H-13AL1-02 7,650' 10,000' 5,929' 5,984' 2-3/8", 4.7#, L-80, ST -L slotted liner; 4980 4320 Liner 3-1/2" 9.3 aluminum billet on to 3H-13AL1-03 7,330' 10,000' 5,910' 5,942' 2-3/8, 4.7#, L-80, ST -L slotted liner; 10540 Tubing 3-1/2" 9.3 J-55 with de to mant on to Existing Casing/Liner Information Category OD Weight f Grade Connection Top MD Btm MD Top TVD Btm TVD Burst psi Collapse psi Conductor 16" 62.5 H-40 Welded 0' 110' 0' 110' 1640 670 Surface 9-5/8" 36.0 J-55 BTC 0' 3072' 0' 2929' 3520 2020 Production 7" 26.0 J-55 BTC 0' 5970' 0' 5173' 4980 4320 Liner 3-1/2" 9.3 L-80 BTC -MOD 5808' 7755' 5049' 6203' 10160 10540 Tubing 3-1/2" 9.3 J-55 EUE 8rd 0' 5836' 0' 5071' 6980 7400 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based PowerVis mud (8.6 ppg) — Drilling operations: Chloride -based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and shale stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 3H -13A laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be Page 3 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 3H-13 Window (7338' MD. 5985' TVD) Usina MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3H -13A is a Kuparuk A -sand producer equipped with 3-1/2" tubing and 3-1/2" production liner. The CTD sidetrack will utilize four laterals to target the A sand to the north and south of the 314-13A parent wellbore. The laterals will increase recovery and add additional resources. Pre -CTD Work 1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP. 2. RU Service Coil: Mill out "D" nipple and conduct fill cleanout. 3. Prep site for Nabors CDR3-AC rig. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" EOPE, test. 2. 3H-13AL1 Lateral (A1 sand - south) a. Set top of whipstock at 7338' MD. Page 4 of 6 October 23, 2018 Pumps On 1.8 bpm) Pumps Off A -sand Formation Pressure 8.3 2567 psi 2567 psi Mud Hydrostatic 8.6 2677 psi 2677 psi Annular friction i.e. ECD, 0.08psi/ft) 587 psi 0 psi Mud + ECD Combined no chokepressure) 3264 psi Overbalanced -697psi) 2677 psi Overbalanced -110psi) Target BHP at Window 11.8 3672 psi 3672 psi Choke Pressure Required to Maintain Target BHP 408 psi 995 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3H -13A is a Kuparuk A -sand producer equipped with 3-1/2" tubing and 3-1/2" production liner. The CTD sidetrack will utilize four laterals to target the A sand to the north and south of the 314-13A parent wellbore. The laterals will increase recovery and add additional resources. Pre -CTD Work 1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP. 2. RU Service Coil: Mill out "D" nipple and conduct fill cleanout. 3. Prep site for Nabors CDR3-AC rig. Rig Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" EOPE, test. 2. 3H-13AL1 Lateral (A1 sand - south) a. Set top of whipstock at 7338' MD. Page 4 of 6 October 23, 2018 PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03 b. Mill 2.80" window at 7338' MD. c. Drill 3" bi-center lateral to TD of 10600' MD. d. Run 2-3/8" slotted liner with aluminum billet from TD up to 7750' MD. 3. 3H-13AL1-01 Lateral (A2/A3 sand - south) a. Kick off of the aluminum billet at 7750' MD. b. Drill 3" bi-center lateral to TD of 10600' MD. c. Run 2-3/8" slotted liner with aluminum billet from TD up to 7430' MD. 4. 311-13AL1-02 Lateral (Al sand - north) a. Kickoff of the aluminum billet at 7430' MD. b. Drill 3" bi-center lateral to TD of 10000' MD. c. Run 2-3/8" slotted liner with aluminum billet from TD up to 7650' MD. 5. 3H-13AL1-03 Lateral (A2/A3 sand -north) a. Kickoff of the aluminum billet at 7650' MD. b. Drill 3" bi-center lateral to TD of 10000' MD. c. Run 2-3/8" slotted liner with deployment sleeve from TD up to 7330' MD. 6. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. Obtain SBHP. 2. Change out gas lift design. 3. Return well to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. - Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. - Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. - When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. - The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA un -deployment, the steps listed above are observed, only in reverse. Liner Running - The 3H -13A laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a Page 5 of 6 October 23, 2018 PTD Application: 31-1-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 31-1-13AL1-03 deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AA 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional, resistivity, and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 3H-13AL1 4760' 3H-13AL1-01 4820' 3H-13AL1-02 • 6630' 3H-13AL1-03 6850' Distance to Nearest Well within Pool Lateral Name Distance Well 3H-13AL1 703' 31-1-12A 3H-13AL1-01 703' 31-1-12A 3H-13AL1-02 155' 31-1-13A 3H-13AL1-03 155' 31-1-13A 16. Attachments Attachment 1: Directional Plans for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03laterals Attachment 2: Current Well Schematic for 3H -13A Attachment 3: Proposed Well Schematic for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, &3H-13AL1-03 laterals Page 6 of 6 October 23, 2018 ConocoPhillips Project: Kuparuk River Unit Site: Kupanak 3H Pad mernilc ea:n: e� wty:inlrn.a WELLBORE DETAILS: 3H-13AL1 xEFExExcE Il Parent Wellbore: 3H -13A c9aal,ae Ixa) aelrerce: Wel3x-t; clue wun Well: 3H-13 sue:vm.nna.sn Te an MD'. ]3011.00 vemwHnml antrerce: 3Ht3�J6.aounl3x43) Se lion Nsl xerererce: ald-to.oax,sooEj Wellbore: L1 Plan: 3X513ALt_wp04 ((3H-1H-13gH-13AL1) p.l:°�in�rt0i 8kazuretl Oq,N Rehienx 3H13 � JB.WIsa13413) — MOEe1. eaouml ceeuanm Ineuwa: Mdm:nn cwewre BAIUGHES a GEc.., ,' p bzL;163_L ur IlLagl!-2+ - :II-JI/311JIAL1 dll-EE/311'_^[HO Al 1 "Pil-9.h11-no II .'All ''All :LH P11n 111 111111=1 I I'll. _ RA I 7650 200 "'i 1. c999 3143:n14P_ (51;:R1 -➢-3111,fl it JI ] 5001. II loll :'I.I 1 311 1 I _I: 6750 9ld � 1 filo /�11 .f1 1+I1'I LL 61001 n l 311 unr-1.1 58501 'II IUi91-19 UO�q `°Op uy II 1. aPul _ -xomi y 5400 11. 11 -fi4 n -01 1 a � 11 fYuf'INI G 4950 - ---- j4500 u:mal all Mil C �- all-xL I1-11 t 1 I'Ill (,��� W, 4050 ca -.- 311 ! 111 JI ail riv H �I)-IJIII l -1.31n16^_n 'nl-wx.a L:x1Hn - - soon 1 310 O 50 3 I I 111-1ti,n nl.lvnbl5 n11 'M li �1 sl0n u � 't lx I4 111 113111 n11 �141nH1 u -1F 411-Ik c^ O[' n1 11i-Id/iN I1�I ql S _ _ 311-ILnI 14N o B(1QIN II -I -11'11 1 250- Sn-I. III ISOD 1� -'n1i 11 2 Ai II 1i R 311/ 1V P/ 5 _ u 11 11 1 V.1 ,%1 Bill-IIAI2411. . 13sD 3N s•u�nnPly. u �o-u rnnnm .III .1 1.3 900 ' d L IIV IH I I I yam. 450 I I� S/uJ 311-Inli l -In II 1 II-4Vf � 1 • �� _ r r 911 II I'_ll "Yfi ' 311 19I3FFIUC '•� it l-IM1a11-1rrr\1'111 311a Y1311 fK slilNi II .IJ+I IS"L 11 I:va ICI.I 'V IH 900 J,: _ I 11 _ I"i/"33n11-:+V ovn 1350 .III-In11I Hef. . -1800101-- -750.61- 540 4 _-•--I--- -]650 T 56 00 6950 6300 50 540950 -1500 -0050 3600 3150-2]00 -1250 -1800 -I 350 9 22 90 550 9d0 150 1800 50 700 150 16060 4 1 0 4050 3$0U 495D 400 5650 63D0 07 50 Z00 3xnn311-n1 Westf-1/f?acil+l l`da0 iixft/inl ._._..._ M-mmla 311-1.O14d3A 3H-13 @ 75.ODusit (3H-13) ConocoPhillips _ConocoPhillips Export Company Kuparuk River Unit Kuparuk 3H Pad 3H-13 3H-13AL1-02 Plan: 3H-13AL1-02_wp02 Standard Planning Report 22 October, 2018 BER GHES BA `. ConocoPhiilips ConocoPhillips Planning Report RF UGHES a GEmmpa, Database: EDT 14 Alaska Production Company: _ConomPhillips Export Company Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 31-1-13 Wellbore: 3H-13AL1-02 Design: 3H-13ALl-02_wp02 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: We113H-13 Mean Sea Level 31-1-13 @ 76.00usft (3H-13) True Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kupamk 3H Pad Site Position: Northing: 6,000,110.73 usft Latitude: 70° 24'41.531 N From: Map Easting: 498,655.44usft Longitude: 150° 0'39,416 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: -0.01 ° Well 3H-13 Well Position +N/ -S 0.00 usft Northing: 6,000,475.46 usft . Latitude: 70° 24'45.119 N +E/ -W 0.00 usft Easting: 498,655.42 usft - Longitude: 150° 0'39.419 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3H-13AL1-02 Magnetics Model Name Sample Date Declination Dip Angie Field Strength (°) V) (nT) BGGM2018 11/1/2018 16.83 80.91 57,435 Design 3H-13AL1-02_vep02 Audit Notes: Version: Phase: PLAN Tie On Depth: 7,430.00 Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (°) 0.00 0.00 0.00 0.00 Plan Sections Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +N/ -S +E/ -W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°1100usft) (°/100usft) ('110(jusft) (°) Target 7430.00 89.32 48.89 5,940.13 3,094.19 -748.87 0.00 0.00 0.00 0.00 7,530.00 95.38 45.38 5,936.04 3,162.11 -675.68 7.00 6.06 -3.51 -30.00 7,700.00 90.28 34.61 5,927.63 3,291.99 -566.78 7.00 -3.00 -6.34 -115.00 8,000.00 90.26 13.60 5,926.19 3,564.29 -444.95 7.00 -0.01 -7.00 -90.00 8,250.00 81.61 358.34 5,944.00 3,811.32 418.92 7.00 -3.46 -6.10 -120.00 8,360.00 85.50 351.66 5,956.36 3,920.12 428.46 7.00 3.54 -6.08 -60.00 8,460.00 90.02 346.30 5,960.27 4,018.14 -447.55 7.00 4.51 -5.36 -50.00 8,860.00 90.01 14.30 5,960.16 4,414.16 -445.47 7.00 0.00 7.00 90.00 9,200.00 85.20 350.97 5,974.54 4,751.06 -429.85 7.00 -1.42 -6.86 -102.00 9,450.00 89.87 7.85 5,985.36 4,999.84 -432.35 7.00 1.87 6.75 75.00 9,850.00 90.36 35.85 5,984.55 5,367.42 -284.96 7.00 0.12 7.00 89.00 10,000.00 90.35 25.35 5,983.63 5,496.35 -208.71 7.00 0.00 -7.00 -90.00 10!222018 6:20'34PM Page 2 COMPASS 5000.14 Build 85D ConocoPhillips BR ConocoPhillips Planning Report UGHES a Uco.paq Database: EDT 14 Alaska Production Local Coordinate Reference: Well 3H-13 Company: _ConocoPhillips Export Company TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 31-1-13 @ 76.00usft (31-1-13) Site. Kuparuk 3H Pad North Reference: True Well: 31-1-13 Survey Calculation Method: Minimum Curvature Wellbore: 31-1-13AL1-02 Measured Design: 3H-13AL1-02_wp02 Planned Survey Measured TVD Below 46 Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System tN/S +E/ -W Section Rate Azimuth Northing Easting (usft) (1 (e) (usft) (usft) (usft) (usft) (°1100usft) (°) (usft) (usft) 7,430.00 89.32 48.89 5,940.13 3,094.19 -748.87 3,094.19 0.00 0.00 6,003,569.47 497,907.18 TIP/KOP 7,500.00 93.56 46.43 5,938.37 3,141.30 -697.16 3,141.30 7.00 -30.00 6,003,616.57 497,958.90 7,530.00 95.38 45.38 5,936.04 3,162.11 -675.68 3,162.11 7.00 -30.06 6,003,637.38 497,980.38 Start 7 die 7,600.00 93.29 40.93 5,930.75 3,213.02 -627.96 3,213.02 7.00 -115.00 6,003,688.27 498,028.10 7,700.00 90.28 34.61 5,927.63 3,291.99 -566.78 3,291.99 7.00 -115.34 6,003,767.22 498,089.29 3 7,800.00 90.28 27.61 5,927.14 3,377.56 -515.15 3,377.56 7.00 -90.00 6,003,852.77 498,140.92 7,900.00 90.27 20.61 5,926.65 3,468.78 -474.34 3,468.78 7.00 -90.03 6,003,943.98 498,181.75 8,000.00 90.26 13.60 5,926.19 3,564.29 -444.95 3,564.29 7.00 -90.07 6,004,039.48 498,211.16 4 8,100.00 86.77 7.54 5,928.78 3,662.50 -426.61 3,662.50 7.00 -120.00 6,004,137.67 498,229.51 8,200.00 83.31 1.43 5,937.43 3,761.76 -418.82 3,761.76 7.00 -119.84 6,004,236.92 498,237.32 8,250.00 81.61 358.34 5,944.00 3,811.32 -418.92 3,811.32 7.00 -119.31 6,004,286.47 498,237.23 6 8,300.00 83.37 355.29 5,950.54 3,860.80 -421.67 3,860.80 7.00 -60.00 6,004,335.95 498,234.49 8,360.00 85.50 351.66 5,956.36 3,920.12 -428.46 3,920.12 7.00 -59.60 6,004,395.27 498,227.71 6 8,400.00 87.31 349.51 5,958.87 3,959.50 -434.99 3,959.50 7.00 -50.00 6,004,434.64 498,221.19 8,460.00 90.02 346.30 5,960.27 4,018.14 -447.55 4,018.14 7.00 -49.87 6,004,493.28 498,208.63 7 8,500.00 90.02 349.10 5,960.26 4,057.22 -456.07 4,057.22 7.00 90.00 6,004,532.35 498,200.12 8,600.00 90.02 356.10 5,960.23 4,156.32 -468.94 4,156.32 7.00 90.00 6,004,631.45 498,187.27 8,700.00 90.02 3.10 5,960.20 4,256.26 -469.64 4,256.26 7.00 90.00 6,004,731.38 498,186.60 8,800.00 90.02 10.10 5,960.17 4,355.53 -458.15 4,355.53 7.00 90.00 6,004,830.64 498,198.10 8,860.00 90.01 14.30 5,960.16 4,414.16 -445.47 4,414.16 7.00 90.01 6,004,889.26 498,210.79 8 8,900.00 89.43 11.56 5,960.35 4,453.15 -436.52 4,453.15 7.00 -102.00 6,004,928.24 498,219.75 9,000.00 87.99 4.71 5,962.60 4,552.05 -422.37 4,552.05 7.00 -101.99 6,005,027.13 498,233.91 9,100.00 86.57 357.85 5,967.36 4,651.85 -420.14 4,651.85 7.00 -101.83 6,005,126.92 498,236.16 9,200.00 85.20 350.97 5,974.54 4,751.06 -429.85 4,751.06 7.00 -101.51 6,005,226.12 498,226.47 9 9,300.00 87.04 357.74 5,981.31 4,850.26 -439.65 4,850.28 7.00 75.00 6,005,325.34 498,216.68 9,400.00 88.92 4.48 5,984.84 4,950.14 -437.72 4,950.14 7.00 74.54 6,005,425.18 498,218.64 9,450.00 89.87 7.85 5,985.36 4,999.84 -432.35 4,999.84 7.00 74.30 6,005,474.88 498,224.02 10 9,500.00 89.93 11.35 5,985.45 5,049.13 -424.01 5,049.13 7.00 89.00 6,005,524.16 498,232.36 9,600.00 90.06 18.35 5,985.46 5,145.73 -398.40 5,145.73 7.00 88.99 6,005,620.75 498,257.99 9,700.00 90.18 25.35 5,985.25 5,238.49 -361.20 5,238.49 7.00 88.99 6,005,713.49 498,295.20 9,800.00 90.30 32.35 5,984.84 5,326.02 -312.98 5,326.02 7.00 89.01 6,005,801.01 498,343.43 9,850.00 90.36 35.85 5,984.55 5,367.42 -284.96 5,367.42 7.00 89.04 6,005,842.39 498,371.46 11 9,900.00 90.36 32.35 5,984.24 5,408.82 -256.93 5,408.82 7.00 -90.00 6,005,883.78 498,399.49 10,000.00 90.35 25.35 5,983.63 5,496.35 -208.71 5,496.35 7.00 -90.02 6,005,971.30 498,447.72 Planned TD at 10000.00 10/222018 6: 20: 34PM Page 3 COMPASS 5000.14 Build 85D Local Coordinates Hole ConocoPhillips ConocoPhillips Planning Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Company: _ConocoPhillips Export Company TVD Reference: Project: Kuparuk River Unit MD Reference: Site: Kupamk 3H Pad North Reference: Well: 3H-13 Survey Calculation Method: Wellbore: 3H-13AL1-02 5,960.27 Design: 3H-13AL1-02_wp02 9,200.00 Casing Points 9,450.00 5,985.36 9,850.00 Measured Vertical 10,000.00 5,983.63 Depth Depth 9 4,999.84 (usft) (usft) Name 5,367.42 10,000.00 5,983.83 2 3/8" 11 Local Coordinates Hole Plan Annotations Measured Vertical Depth Depth (usft) (usft) 7,430.00 5,940.13 7,530.00 5,936.04 7,700.00 5,927.63 8,000.00 5,926.19 8,250.00 5,944.00 8,360.00 5,956.36 8,460.00 5,960.27 8,860.00 5,960.16 9,200.00 5,974.54 9,450.00 5,985.36 9,850.00 5,984.55 10,000.00 5,983.63 Local Coordinates Hole «N/S +E/ -W (in) (usft) (usft) Comment 3,094.19 -748.87 TIP/KOP 3,162.11 -675.68 Start 7 dls 3,291.99 -566.78 3 3,564.29 444.95 4 3,811.32 418.92 5 3,920.12 428.46 6 4,018.14 447.55 7 4,414.16 445.47 8 4,751.06 429.65 9 4,999.84 432.35 10 5,367.42 -284.96 11 5,496.35 -208.71 Planned TD at 10000.00 BAF�UGHES a GEcompany Well 3H-13 Mean Sea Level 3H-13 @ 76.00usft (311-13) True Minimum Curvature Casing Hole Diameter Diameter (in) (in) 2.375 3.000 10222018 6:20:34PM Page 4 COMPASS 5000.14 Build 85D ConocoPhillips BAER ConocoPhillips Travelling Cylinder Report UGHES aGEmmpany Company: ConocoPhillips (Alaska) Inc. -Kup2 Project: Kupamk River Unit Reference Site: Kuparuk 3H Pad Site Error: 0.00 usft Reference Well: 3H-13 Well Error: 0.00 usft Reference Wellbore 3H-13AL1-02 Reference Design: 3H-13AL1-02_wp02 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3H-13 3H-13 @ 76.00usft (3H-13) 3H-13 @ 76.00usft (311-13) True Minimum Curvature 1.00 sigma EDT 14 Alaska Production Offset Datum Reference 3H-13AL1-02_wp02 Filter type: NO GLOBAL FILTER: Using user defined selection & filtering criteria Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 7,430.00 to 10,000.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum centercenter distance of 1,192.40 usft Error Surface: Pedal Curve Site Name Offset Well - Wellbore - Design Kupawk 3H Pad 311-10-3H-10CL2-3H-1 OCL2 311-10 - 3H40CL2-02 - 3H-10CL2-02 311-11 -3H-11 -3H-11 3H -11 -3H -11A -3H -11A 3H -11-3H-11 AL1-3H-11AL7 3H-11 - 311-11 AL1 -01 - 3H-11 AL1 -01 3H-12 - 311-12 - 311-12 311-12 - 3H -12A- 3H -12A 3H -12-311i - 3H-12AL1 3H-12 - 3H-12AL2 - 3H-1 2AL2 3H-12 - 3H-12AL3 - 3H-12AL3 3H-12-3H-12APB7-3H-12APB1 3H-13 - 3H -13A - 3H -13A 311-13-311-13AL1-3H-13AL1_wpG4 3H-13 - 3HA 3AL1-01 - 3H-13AL1-01_wp01 3H-13 - 311-13AL1-03 - 3H-13AL1-03_wp03 3H-14 - 3H-14 - 3H-14 3H -14 -3H -14A -3H -14A 3H-14-3H-14APB1-3H-14APB1 3H-14 - 3H -14B - 3H -14B 3H-14-3H-141311-3H-14BL1 3H-14-311-14BL2-3H-14BL2 311-14 - 3H-14BL3 - 311-14BL3 311-14 - 3H-14BL4 - 311-14BL4 311-17 - 3H-17 - 3H-17 3H-19 - 311-19 - 311-19 Reference Date 10/22/2018 Centre to No -Go Allowable Survey Tool Program Measured Centre Distance From To Depth Distance (usft) (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 5,905.00 3H-13 (3H-13) GCT -MS Schlumberger OCT multishot Out of range 6,118.56 7,300.00 3H -13A ATDB(3H-13A) MWD MWD - Standard 7,300.00 7,430.00 3H-13AL1_wp04(3H-13AL7) MWD MWD -Standard 7,430.00 10,000.00 311-13AL1-02_wp02(3H-13AL1-02) MWD MWD - Standard Out of range 7,630.00 7,700.00 Casing Points 212.38 971.60 Pass - Major Risk Measured Vertical Casing Hole Out of range Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 212.34 10,000.00 6,059.63 2 3/8" Pass - Major Risk 2.375 3.000 Site Name Offset Well - Wellbore - Design Kupawk 3H Pad 311-10-3H-10CL2-3H-1 OCL2 311-10 - 3H40CL2-02 - 3H-10CL2-02 311-11 -3H-11 -3H-11 3H -11 -3H -11A -3H -11A 3H -11-3H-11 AL1-3H-11AL7 3H-11 - 311-11 AL1 -01 - 3H-11 AL1 -01 3H-12 - 311-12 - 311-12 311-12 - 3H -12A- 3H -12A 3H -12-311i - 3H-12AL1 3H-12 - 3H-12AL2 - 3H-1 2AL2 3H-12 - 3H-12AL3 - 3H-12AL3 3H-12-3H-12APB7-3H-12APB1 3H-13 - 3H -13A - 3H -13A 311-13-311-13AL1-3H-13AL1_wpG4 3H-13 - 3HA 3AL1-01 - 3H-13AL1-01_wp01 3H-13 - 311-13AL1-03 - 3H-13AL1-03_wp03 3H-14 - 3H-14 - 3H-14 3H -14 -3H -14A -3H -14A 3H-14-3H-14APB1-3H-14APB1 3H-14 - 3H -14B - 3H -14B 3H-14-3H-141311-3H-14BL1 3H-14-311-14BL2-3H-14BL2 311-14 - 3H-14BL3 - 311-14BL3 311-14 - 3H-14BL4 - 311-14BL4 311-17 - 3H-17 - 3H-17 3H-19 - 311-19 - 311-19 Reference Offset Centre to No -Go Allowable Measured Measured Centre Distance Deviation Warning Depth Depth Distance (usft) from Plan (usft) (usft) lush) (usft) Min centre to center distance or covement point SF - min separation factor. ES - min ellinse senaratinn 10222018 3'30: 21PM Page 2 COMPASS 5000.14 Build 85D Out of range Out of range Out of range Out of range Out of range Out of range Out of range 7,630.00 7,700.00 1,181.04 212.38 971.60 Pass - Major Risk Out of range Out of range 7,630.00 7,700.00 1,181.04 212.34 971.63 Pass - Major Risk Out of range 7,605.39 7,650.00 155.27 17.56 147.43 Pass- Major Risk 7,449.92 7,450.00 1.55 1.35 0.25 Pass- Major Risk 7,449.91 7,450.00 1.55 1.30 0.25 Pass - Major Risk 9,191.58 9,225.00 25.39 0.36 25.16 Pass - Minor 1/10 Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range Out of range 9,330.00 7,875.00 1,082.69 284.27 802.93 Pass - Major Risk Out of ranae Min centre to center distance or covement point SF - min separation factor. ES - min ellinse senaratinn 10222018 3'30: 21PM Page 2 COMPASS 5000.14 Build 85D WELL DETAILS: 3H-13 +N/ -S +E/ -W Northing Easting Latitude Longitude 0.00 0.00 6000475.46 496655.42 70° 24'45.119 N 150° 0'39.419 W Sec MD Inc Azi TVDSS +N/ -S +EAW Dleg TFace vsect Annotation 1 7430.00 89.32 48.89 5940.13 3094.19 -748.87 0.00 0.00 3094.19 TIP/K0P 2 7530.00 95.38 45.38 5936.04 3162.11 -675.68 7.00 -30.00 3162.11 Start 7 d15 3 7700.00 90.28 34.61 5927.63 3291.99 -566.78 7.00 -115.00 3291.99 3 4 8000.00 90.26 13.60 5926.19 3564.29 .444.95 7.00 -90.00 3564.29 4 5 8250.00 81.61 358.34 5944.00 3811.32 -418.92 7.00 -120.00 3811.32 5 6 8360.00 85.50 351.66 5956.36 3920.12 -428.46 7.00 -60.00 3920.12 6 7 8460.00 90.02 346.30 5960.27 4018.14 -447.55 7.00 -50.00 4018.14 7 8 8860.00 90.01 14.30 5960.16 4414.16 -445.47 7.00 90.00 4414.16 8 9 9200.00 85.20 350.97 5974.54 4751.06 -429.85 7.00 -102.00 4751.06 9 10 9450.00 89.87 7.85 5985.36 4999.84 -432.35 7.00 75.00 4999.84 10 11 9850.00 90.36 35.85 5984.55 5367.42 -284.96 7.00 89.00 5367.42 11 12 10000.00 90.35 25.35 5983.63 5496.35 -208.71 7.00 -90.00 5496.35 Planned TO at 10000.00 I F` Mean ; c Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 3H-13 3H-i3/1L1-02 ° wee':=�e None last wae"aa F.0, s'.ewin naxa.. p Nq 90.9+ WELLBORE DETAILS: 3H-13ALt-02 FEFSENCE INFORWTION BA <ER F�UGHES Parent Wetlbore: 3H-13ALt Te on MD' 7430.00 coarEinele lxk�Relarerce: we13a-13.T:ue Nosh V.1 (m) . MeanamL S 6lo1-N.00N.e(CE) ConoeoPhillips Wellbore: Plan: 3H-t0AL1-02 wp02(3H.13/3X.13AL1-02) elaoiami ro NS)Rnk .: w .w Deets Rehm 8&3®7eww ((.13) GEmmpany Mmml Cdehic, *b . M. Cu. WELL DETAILS: 3H-13 +N/ -S +E/ -W Northing Easting Latitude Longitude 0.00 0.00 6000475.46 496655.42 70° 24'45.119 N 150° 0'39.419 W Sec MD Inc Azi TVDSS +N/ -S +EAW Dleg TFace vsect Annotation 1 7430.00 89.32 48.89 5940.13 3094.19 -748.87 0.00 0.00 3094.19 TIP/K0P 2 7530.00 95.38 45.38 5936.04 3162.11 -675.68 7.00 -30.00 3162.11 Start 7 d15 3 7700.00 90.28 34.61 5927.63 3291.99 -566.78 7.00 -115.00 3291.99 3 4 8000.00 90.26 13.60 5926.19 3564.29 .444.95 7.00 -90.00 3564.29 4 5 8250.00 81.61 358.34 5944.00 3811.32 -418.92 7.00 -120.00 3811.32 5 6 8360.00 85.50 351.66 5956.36 3920.12 -428.46 7.00 -60.00 3920.12 6 7 8460.00 90.02 346.30 5960.27 4018.14 -447.55 7.00 -50.00 4018.14 7 8 8860.00 90.01 14.30 5960.16 4414.16 -445.47 7.00 90.00 4414.16 8 9 9200.00 85.20 350.97 5974.54 4751.06 -429.85 7.00 -102.00 4751.06 9 10 9450.00 89.87 7.85 5985.36 4999.84 -432.35 7.00 75.00 4999.84 10 11 9850.00 90.36 35.85 5984.55 5367.42 -284.96 7.00 89.00 5367.42 11 12 10000.00 90.35 25.35 5983.63 5496.35 -208.71 7.00 -90.00 5496.35 Planned TO at 10000.00 I F` Mean ; c West( -)/East(+) (500 us@/in) 5416 ■■■■■■l�llIBM ■■■Emmi l■■■■■■■■o■ ■■■1 510 5510-- 1■■■■■ ■ FAIR ■ ■■■1 ;;1■■■■■■�fril■...■.NEI 605 5101. 1■■■■■ I WE . NMI 1■■■ ■�ii�l31M■■■■■■■1 5700 Q J -i 1■■■■��■■■■■■ 5795 Z 3H-1 /3H-1 AL 1■■■■■ ■■■■■ 5890 1■■■ ONE ■\1��A�■■�■■■■1 111■■■■■■■��r,:��■■■■■■■■■1 1■■■■■■ -I 3A lA3 ._.. --. MH 3H."dat 0■■■■1 ; 1■■■ up MEMO 5 i;►��i�■■■■■■■■1 1■■■■■■■r�.�®■■■■1 6080 6 7 48 P anngd lDul 1 11111"m [ 7 d1 3H-1 8H-1 A ---------- H-13 LI -02 �■■ lll�llll!_■��■tl West( -)/East(+) (500 us@/in) 5416 510 5510-- 605 5101. 5700 Q J -i 5795 Z 3H-1 /3H-1 AL 5890 ] -13 H -I 3A lA3 ._.. --. MH 3H."dat 5985 ; up 5 6080 6 7 48 P anngd lDul SI [ 7 d1 3H-1 8H-1 A H-131 H-13 LI -02 6175 6270 3 -13A -02 F u112 6365 ea L vertical section at u.uu- (9S ustV]n) 1 KUP PROD 3H -13A ConoeoPhllllp$ Well Attributes Max Angie&MD JTD AWska lrlC wenw,c APuuwl seta N,me wenbore seas nnl l'1 m01nKB1 Act elm lxkel 501032008901 KUPARUK RIVER UNIT PROD 5930 6,9]4.11 ],)550 Comment USE(Pind Gale SSSV'. NIPPLE 250 412/2015 Mndatwn Cretale Las(WC'. 116/1997 K KINJOl Rip NNmu DMe 3201 1/9/1988 314-13A6'2ROm541809PM area scromac anu gnnotation peIXn (flHel EnE Date gnnafalion Last MOUBy End Date Last Ta :SLIP ],624.0 9/16/2015 Rev 9 Reason: GLVC/O,TAG, H2S pproven 9/2912015 HANGE as ng nags T -7-n9 Dowiptmn OD (in) IDlintTop CONDUCTOR 16 15062 PRE 36.0 6tt Cepin Ou'le 110.0 Sinoeptn lrvDl-. woLen P... ..Toprnreaa 1100 5250 H-40 WELDED VmngD ription 00 (in, /Olin) Top(MIN Set pawn PKIR Set TURK (ND1—wpLeo ll... Grade TopTN— SURFACE 9518 8.921 35 .0 3.0]18 94 38. 29200155 BTC was Mae Dnactiptun OD do IDlin) PROWCTION Post 7 62]6 Top (ana) 330 Sn Depth IflN81 5,970.0 Set DWIM1 pyM...ILen (I... Gm]e TOP 5,1]25 28.00155 BTC IDrW SR Caingeeacxpnon US (in) do (and ToRIXKB) Set Depth laKM Sat Depth lrvolw11 ... Len B...G�tl� Top TK—d LINER 31l 2.992 5,8084 ],)550 9.30 NO BTCMOD Liner Details TOP PKlU 1,OVIlpMBI Topmdl'1 uem Des eom rvo(iin) to 9n1 cOxOucioR:3e DnOO 5,8084 5,049.) 40501T PACKER AKER LINER TIEBACK SLEEVE wIBAKER G2 R LINER TOP PACKER PRE 5.250 5,8223 5.060.3 I 0411 HANGER BAKER HMC LINER HANGER NIPPLE SOTS 5,829.1 50654 494] SBE BAKER SEAL BORE EXTENSION 4000 Tubing Strings GA6 LIFT: 212a.t 1n6mppewnpton Stdn9 Ma_. IO in) roplKKel Set OePm ld. set Depen lrv011 wglon0 erne rop connmmn TUBING 31/2 2992 2)0 5,:3364 50)10 930 J-55 EUE 8rd Completion Details NwninallD TOp(flKBI Top (TOM (ase) Topineir) Item Dc own (in) 27.0 27.0 0.16 HANGER McEvoy 3112' BOOM GEN III Tubing hanger w/155 Pup 2.992 EUE find top 501.5 5014 0.85 NIPPLE 312" Cameo DS'Nipp)e 4.59OD. 2.812"ID 2812 SURFACE MO-ZO718— 5,5029 5,045.5 4051 NIPPLE 3112" CAMCO V Nipple wl 2.759' No-GOPmBIe 2.50 5809.8 5.050.9 40.50 LOCATOR BAKER LOCATOR 3.000 GASUFT:4,1176 5,8120 5,052.4 40,50 SEAL AS MSY BAKER GBH SEAL ASSEMLY w/10'STROKE & 3000 SPECIAL LOCATOR TO STAB INTO LINER TIE -BACK SLEEVE/PACKER GASUFT:5p771 tither In Hole )Wireline retrievable plugs, valves, pumps, fish, etc.) ToplrvDl mP ma TOP nKeI Inset 1'1 oea Coen Run Oak ID pnl 5,946.0 5,1550 4106 NANDOW SIDETRACK CASING WINDOW 1/61199] 6.000 Perforations & Slots GASUFTE.n72 IPpt TT Top Ovid) IND) (Dem i . Top (I wesqu g MKB) (it") Lone DM D Typo Com 7,229.0 7,249.0 5.9273 59379 C4. UNIT 8, 5/912002 4.0 RPERF 25' HSD, PJ DP ChgE 31HAM 60 deg ph xIvPLE:5.m2.9 7,258.0 7,3080 5,9427 5,969.2 A-3, A2,3H- 1121/199] 40 TrI 180 deg. phasing; 212' 13A HSDCamer ),355.0 7,365.0 59944 5899.6 71,3H -13A 8/252009 8.0 VE—RF YHMXMillenium, 60 deg pH LOCATOR.Eedi ].3]2.0 7,380.0 6.002.7 6,0913.9 A -1. 3H -13A 8/2512009 6.0 APERF Y' HMX MIIIenlum. 60 deg pH Mandrel Inserts 6E4KSY:50120 M atl N Top laKB) Top (ND) (flKB) Mahe Model OOlin) 6zw Valve TyPe LNnn Type Pon Size III TRO Run have Run DMe Co. 1 2.]20.1 2,851.1 Cam04 KBUG 1 GASLIFF GLV BK 0.156 1,3190 9/2512015 800 91132 015 2 4,1178 3.]44.0 US Do BUG 1 GAS LIFT GLV BK 0.158 1.280.0 9252015 9:30 9/132 015 WINDOW;5948.0 J 5,077.1 4.4879 Cameo KBUG 1 GAS LIFT GLV BK 0.188 1 ]030 9/2WO15 9:00 911312 015 PRODUCTION Fon Sa, 65,9]00 4 5,]5].2 50108 MCC MMM 112 GASLIFF OV FW 0.188 00 9/292015 230 91 0155 Notes: General & Safety Em oak Annotation 1/611997 NOTE'.WELL SIDETRACKED- ORIGINAL COMPLETION DATE IW1968 RPERFJ.SRI.D72ASO� 1/2012004 NOTE: WAIVERED WELL IAx OACOMMUNICATION 811612009 NOTE: TIGHT SPOT M 7260' -Tat 3' 'r129/2010 NOTE View Schematic w/Flasks SChematic)0 IPERR7.2M0I APERE7.M6.D7,MSa— APERF.7372D7.380.0— LINER: SAM.4.7.7550 31-1-13A Proposed CTD Schematic 110' MD ', 36# J-55 at 3072' MD icked at MD (1997) C -sand parts 7229-7249' MD sand pads 7258'-7308' MD 7356'-7366' MD 7372'-7380' MD L -BO liner 5808'-7755' MD 3-112" Camco DS -nipple at 502' MD (2.813" min ID) 3-1/2" 9.3# L-80 EUE find Tubing to surface 3-1/2" Camco KBUG gas lift mandrels 2720', 4118', 8 5077' MD 3-1/7' Camco MMM gas lift mandrel 5757' MD 3-1/2" Camoo D -nipple at 5803' MD (2.750" min ID) Baker 3-1/2" GBH -22 seal assembly at 5812' MD (3" ID) Liner too Baker 5" x 7" ZXP liner top packer at 5808' MD Baker 5" x 7" HMC liner hanger at 5822' MD Baker SBE (12' length with 4" ID seal bore) Landing collar at 7654' MD Tightspotm 3-i/2" liner 7268'-7313' MD KOP at 7338' MD Baker 3-1/2" XL Monobore whipstock 3H-13AL1-03 wp03 TD @ 10,000' MD Liner top at 7330' MD 3H-13AL1-02 wp02 TD @ 10,000' MD Liner Billet at 7650' MD 3H-13AL1-01 wp01 TD @ 10,600' MD Liner Billet @ 7430' MD 3H-13AL1 wp04 TD @ 10,600 MD Liner Billet @ 7,750' MD From: Hernno. Keith E To: Boyer, David L (DOA) Subject: FW: KRU 31-1-13A (PTD #196-197) Date: Tuesday, October 23, 2018 1:21:47 PM Attachments: imaae001.uno 3H-13AL1 wD04 MD - NAD27.hct 3H-13AL1-01 wo01 MD - NAD27.hct 3H-13AL1-02 wD02 MD - NAD27.txt 3H-13AL1-03 wD03 MD - NAD27.tM Dave, Please see the attached. Thanks, Keith Herring CTD Engineer 907.263.4321 (Office) 907.570.2410 (Mobile) 700 G Street, ATO — 664 Kcith.F 11eDin��JconacoDhllbs can ConocoPhillips Alaska From: Herring, Keith E Sent: Tuesday, October 23, 2018 12:00 PM To: Davies, Stephen F (DOA) <steve.davies@alaska.gov> Subject: KRU 3H -13A (PTD #196-197) Hi Steve, Please see the attached text files for KRU 3H -13A. Thanks, Keith Herring CTD Engineer 907.263.4321 (Office) 907.570.2410 (Mobile) 700 G Street, ATO — 664 Keith. F.I lerrin.0conocooh i I I ins.can ConocoPhillips Alaska From: Boyer. David L (DOA) To: "Keith.E Herrina(akop.com" Cc: Davies Stephen F (DOAI; Loeoo Victoria T (DOAI Subject: Digital Survey for KRU 3H-13AL1 Date: Tuesday, October 23, 2018 1:19:00 PM Importance: High Hi Keith, Victoria just dropped off the PTD for KRU 3H-13AL1. Please e-mail a digital copy (Excel or ASCII format) of the survey for this first lateral. We will be requesting the others later. This really speeds up the review. Thanks, Dave Boyer AOGCC TRANSMITTAL LETTER CHECKLIST WELL NAME: K Q LA, —3H — 1.3A L 1 — C)p` s PTD: 2113-137— evelopment _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: K LA p a rGt- 1< 011 Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit / LATERAL No. 194— 19'x, API No. 50- 103 aon A9 �. v (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - _-� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where sam les are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well tesdag program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by 1/ (Companv Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, V composite curves for well logs run must be submitted to the AOGCC within 90 da s after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 PTD#:2181370 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type Well Name: KUPARUK RIV UNIT 311=13ALLQ2--___..Program DEy__— Well bore seg _DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31,05.0306. 1.A)&Q2.A-D) - - - - - - - - - - - - - - - - NA - _ - - - _ - - - - - - 1 Permit fee attached... - - - - - - - - - - - . - - - - .... NA 2 Lease number appropriate- - - - - - - - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 Unique well name and number - - - - - - - Yes - - - - - - 4 Well located in a defined pool- - - - ........ - - - - - _ - Yes 5 Well located proper distance from drilling unit boundary- - - - _ - - - ........ Yes 6 Well located proper distance from other wells - - - . ... - - - - - - . Yes - - - - - - - - - - - 7 Sufficient acreage available indrillingunit - - - - - - - - - - - - - Yes - - - - - - - - - - - - l8 If deviated, is wellbore plat. included - ----- - - - - - - - - - - .. - - - - - - - - . No - _ Directional. plan view is included. - I9 Operator only affected part. - - - - ........... . . . . ......... Yes - - - - - 10 Operator has. appropriate bond in force- - - - - - ---------- Yes .. .. Appr Date 11 Permit can be issued without conservation order- - - ..... - ... - - - - Yes - - - - - - - - - - - - 12 Permit can be issued without administrativeapproval_ ... - - Yes - - - - - - - - - - DLB 10/24/2018 13 Can permit be approved before 15 -day wait - - - . . . . . . ......... Yes ........ ...... 14 Well located within area and strata authorized by Injection Order # (put IO# in- comments) (For NA - - 15 All wells. within 1/4 mile area of review identified (For service well only)- _ - - - - - - - - NA - - - - 16 Pre -produced injector; duration of pre production less than 3 months. (For service well only) NA 18 Conductor string. provided - - - - - - - -------- - - - - - - - - - - - - NA - Conductor setfor KRU. 311-13 Engineering 19 Surface casingprotects all -known USDWs . . . . .. . .. . . . . . ..... NA Surface casing set for KRU 3Hr13 20 CMT vol adequate to circulate. on conductor & surf_csg ------- - - - - - - - - - - - - - NA Surface casing set and fully cemented - - - - 21 CMT vol adequate to tie-in long string to. surf csg- _ - - --- - - - - - - - - - - NA - - - - - - - - - - 22 CMT. will coverall known productive horizons - - - - - .. - - ..... No..... Productive interval will be completed with uncemented slotted liner 23 Casing designs adequate for C.. T, B &_ permafrost. - - _ - Yes - - 24 Adequate tankage or reserve pit - - - - ....... Yes Rig has steel tanks; all waste. to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved - - - - - - - - - - - - - NA - - - - - - - - - - - - - - - 26 Adequate wellbore separation proposed - - Yes Anti -collision analysis complete; no major risk failures - 27 If.diverter required, does it meet regulations - _ - .. - - - - NA Appr Date 28 Drilling fluid program schematic .& equip list adequate. - - - - - - Yes Max formation pressure if 4897 psig(15,5.ppg EMW ); will drill w/ 8.6 ppg EMW. and maintain overbal w/ MPD.. VTL 10/31/2018 29 BOPEs,.do they meet regulation - - - - - - - - - - - - - - - - - - Yes 30 BOPE.press rating appropriate; test to.(put prig in comments)-- - - - - - - - - - - - Yes MPSP is 4299 psig;w ill test BOPS to 4800.psig - - - - - - 31 Choke. manifold complies w/API. RP -53 (May 84) - - ... - - - - Yes - - - - - - - - - - - - - 32 Work will occur without operation shutdown.. - - - - - - - - . - Yes - - - - - - - - - - - - - - - - - 33 is presence of H2S gas probable - - - - - - - - -- - - - - - - - - - - - . ... Yes H2S measures required.... 34 Mechanical. condition of wells within AOR verified (Foc service well only) . . . . . . . .. . .....NA - .. - - - . - ......... 35 Permit can be issued w/o hydrogen sulfide measures - - - - - - - - - - - - No 3H -Pad wells are H2$cbearing.-H2S. measures are required, Geology 36 Datapresentedon potential overpressure zones.. - ....... - - - Yes - - - - - - - - - - - - - - - - Appr Date 37 Seismic analysis of shallow gas zones - - - - - - - NA - - - - - - - - - DLB 10/24/2018 38 Seabed condition survey (if off -shore) _ - . - - - - ...... - NA - - - - - - - - - - - - - - - - - - - - - 39 Contact name/phone for weekly -progress reports (exploratory only] _ - NA - - . . .. . . . . . . . . . ........ . Geologic Date: Engineering Date Public Date Commissioner: Commissioner: Commissioner