Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout218-137DATA SUBMITTAL COMPLIANCE REPORT
2/25/2019
Permit to Drill
2181370 Well Name/No. KUPARUK RIV UNIT 3H-13AL1-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089-62-00
MD
9473
TVD 5997 Completion Date
11/20/2018 Completion Status 1 -OIL
Current Status 1 -OIL UIC No
REQUIRED INFORMATION
Mud Log No ✓
/
Samples ✓
No
Directional Survey Yes
DATA
INFORMATION
List of Logs Obtained: GR/Res
(from Master Well Data/Logs)
Well Log Information:
Log/
Electr
Data
Digital
Dataset
Log Log Run Interval OH I
Type
Med/Frmt Number Name
_ _
Scale Media No Start Stop
P CH
Received
Comments
ED
C
30083 Digital Data
12/10/2018
Electronic File: 3H-13AL1-02 EOW - NAD27.pdf
ED
C
30083 Digital Data
12/10/2018
Electronic File: 3H-13AL1-02 EOW - NAD27.txt
ED
C
30083 Digital Data
12/10/2018
Electronic File: 3H-13AL1-02 EOW - NAD83.pdf
ED
C
30083 Digital Data
12/10/2018
Electronic File: 3H-13AL1-02 EOW - NAD83.txt
Log
C
30083 Log Header Scans
0 0
2181370 KUPARUK RIV UNIT 3H-13AL1-02
LOG HEADERS
ED
C
30115 Digital Data
7052 9473
12/13/2018
Electronic Data Set, Filename: 3H-13AL1-02
GAMMA RES.las
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 21VID Final.cgm
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 5MD Final.cgm
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 5TVDSS Final.cgm
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 2MD Final.pdf
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 51VID Final.pdf
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 5TVDSS Final.pdf
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 EOW - NAD27.pdf
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 EOW - NAD27.txt
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 Final Surveys TO
9473.csv
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 Final Surveys TO
9473.x1sx
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 Survey Listing.txt
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 Surveys.txt
AOGCC
Page 1 of 3
Monday, February 25, 2019
DATA SUBMITTAL COMPLIANCE REPORT
2/25/2019
Permit to Drill 2181370 Well Name/No. KUPARUK RIV UNIT 3H-13AL7-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089.62-00
MD
9473
TVD 5997 Completion Date 11/20/2018
Completion Status 1-0I1. Current Status 1-0I1- UIC No
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-
Mechanical Integrity Test Information Y / NA
Composite Logs, Image, Data Files 'o
Core Photographs Y/&
Geologic Markers/Tops
02_25_tapescan_BHI CTK.tM
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-
COMPLIANCE HISTORY
02_5_tapescan_BH I_CTK.txt
ED
C
30115 Digital Data
12/13/2018
Electronic File: 31-1-13AL1-02_output.tap
ED
C
30115 Digital Data
12/13/2018
Electronic File: 3H-13AL1-02 2MD Final.tif
ED
C
30115 Digital Data
12/13/2018
Electronic File: 31-1-13AL1-02 5MD Final.tif
ED
C
30115 Digital Data
12/13/2018
Electronic File: 31-1-13AL1-02 5TVDSS Final.tif
Log
C
30115 Log Header Scans
0 0
2181370 KUPARUK RIV UNIT 3H-13AL1-02
LOG HEADERS
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion Report 0
Directional / Inclination Data
Mud Logs, Image Files, Digital Data Y /�
Core Chips Y
Production Test Information/ NA
Mechanical Integrity Test Information Y / NA
Composite Logs, Image, Data Files 'o
Core Photographs Y/&
Geologic Markers/Tops
Daily Operations Summary
Cuttings Samples Y /�
Laboratory Analyses Y NA
COMPLIANCE HISTORY
Completion Date: 11/20/2018
Release Date: 10/31/2018
Description
Date Comments
Comments:
AOG( ( Page 2 of 3 Monday, February 25, 2019
DATA SUBMITTAL COMPLIANCE REPORT
2/25/2019
Permit to Drill 2181370 Well Name/No. KUPARUK RIV UNIT 31-1-13AL1-02 Operator CONOCOPHILLIPS ALASKA, INC. API No. 50-103-20089-62-00
MD 9473 TVD 5997 Completion Date 11/20/2018 Completion Status 1-0I1
Compliance Reviewed By:
Current Status 1-0I1- UIC No
Date:
AOGCC Page 3 of 3 Monday, February 25, 2019
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION nrr CJ ifl1R
WELL COMPLETION OR RECOMPLETION REPORT AND
1a. Well Status: Oil❑ • Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions:
1b. Well Class:` v,r,,
Development Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Abend.: 11/20/2018
14. Permit to Drill Number/ Sundry:
218-137 '
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
11117/2018
15. API Number:
50-103-20089-62-00 ,
4a. Location of Well (Governmental Section):
Surface: 1182' FNL, 281' FWL, Sec 12, T12N, R8E, UM
Top of Productive Interval:
3330' FNL, 450' FEL, Sec 2, T12N, R8E, UM
Total Depth:
1525' FNL, 144' FEL, Sec 2, T12N, R8E, UM
8. Date TD Reached:
11/17/2018
16. Well Name and Number:
'KRU 3H-13AL1-02
9. Ref Elevations: KB: 71'
GL: 34 BF:
17. Field / Pool(s):
Kupamk River Field/Kuparuk River Oil
Pool
10. Plug Back Depth MD/TVD:
N/A
18. Property Designation:
ADL25531
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 498655 y- 6000475 Zone- 4
TPI: x- 497923 y- 6003607 Zone- 4
Total Depth: x- 498228 y- 6005412 Zone- 4
11. Total Depth MD/rVD:
9473 MD/ 5997 TVD '
19. DNR Approval Number:
LONS 84-134 & LONS 84-149
12. SSSV Depth MDrrVD:
N/A
20. Thickness of Permafrost MDTrVD:
1628MD/ 1628 TVD
5. Directional or Inclination Survey: Yes E (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD1TVD:
7462 MD/ 5992' TVD
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/Res
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
16' 62.5 H-40 36' 110' 36' 110' 24" 245 sx AS I
9-5/8" 36 J-55 35' 3072' 35' 2929' 12.25" 1300 sx ASIII, 400 sx G, 70 sx ASI
7" 26 J-55 33' 5970' 33' 5173' 8.5" 300sx G, 175 sx ASI
3-1/2" 9.3 L-80 5808' 7755' 5808' 5983' 6.125" 311 sxG
2-3/8" 4.6 L-80 7720' 9473' 5990' 5997' 3" Slotted Liner
24. Open to production or injection? Yes ❑� No ❑
If Yes, list each interval open (MO/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
Slotted Liner 7722'-9473' MD and 5990'- 5997' TVD" I(t118
". - - -.- -
IIIIIe- -
--
25. TUBING RECORD
SIZE I DEPTH SET (MD) PACKER SET (MD/rVD)
3-1/2" 1 5836' 1 5808' MD/ 5050' TVD
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes ❑ No ❑�
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
12/1/2016
Method of Operation (Flowing, gas lift, etc.):
Gas Lift
Date of Test:
12/3/2018
Hours Tested:
14
Production for
Test Period __O�
Oil -Bbl:
924
Gas -MCF:
588
Water -Bbl:
734
Choke Size:
176
Gas -Oil Ratio:
637
Flow Tubing
Press. 238
Casing Press:
1053
Calculated
24 -Hour Rate
Oil -Bbl:
1584
Gas -MCF:
1008
Water -Bbl:
1258
Oil Gravity - API (corr):
23.6
Form 10407 Revised 5/2017 V7 -t- 21:7ONTINUED ON PAGE 2 RDDMS MU IEC'L 124 Submit ORIGINIAL on
/ 9 x.8. -a.I shck t
28. CORE DATA Conventional Corals): Yes ❑ No ❑Q Sidewall Cores: Yes ❑ No ❑�
If Yes, list formations and intervals cored (MD/TVD, Fromffo), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1628
1628
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
7462
5992
information, including reports, per 20 AAC 25.071.
Formation @ TPI -
Kuparuk A-1
TD
9473
5997
Formation at total depth:
Ku aruk A
31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: James Ohlin er Contact Name: Keith Herring -
Authorized Title: Staff CTD Engineer Contact Email: keith.e.herring@cop.com
Authorized Contact Phone: 263-4321
Signature: 11911's
Date: 102
INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
3H -13A Final CTD Schematic •• -• • 1 �-
3-1/2" Camco DS -nipple at 502' MD (2.813" min ID)
18", 82.5#, H-40 3-1/2" 9.3# LA0 EUE 8rd Tubing to surface
shoe at 1 10'MD
3-1/2" Camco KBUG gas lift mandrels 2720', 4118', & 5077' MD
3-1/2" Carhop MMM gas lift mandrel 5757' MD
9-5/8", 36# J-55 11 3-1/2" Camco D -nipple at 5803' MD (2.750" min ID)
shoe at 3072' MD
Baker 3-1/2" GBH -22 seal assembly at 5812' MD (3" ID)
Liner too
Baker 5" x 7" ZXP liner top packer at 5808' MD
sidetracked at
5970' MD (1997)
KOP a( 7315' MD _
C Pe
-santl rfs Baker Y1/2"XL Monobore
7229'-7249' MD hipstock
Tight spat in 3-1/2"
liner 7268'-7313' MD ' ' '
3H-13AL1-D3 TD = 8243' MD
2-3/8" sicced liner wl deployment sleeve
TOL = 7258' MD. BOL = 7644' MD
3H-1MI-1-02 TD = 9473' MD
2-318" slotted liner wl aluminum billet
----------------------- - TOL=7720'MD, BOL =WT IOD
kar 3-1/2" XL MOnobore
ilpstock ______ ___ % Anchoretl billet= 76BB' MD
sand pads
7258'-7308' MD
7356'-7386' MD _ _ _ __
7372'-7380'MD - ----- --
- 3H-13AL1Pa1 TD=90B5'MD
nMoretl billet=7745' MD
3-1/2". 9.3#, L -BO linerI L
5808'-7755' MD
:d liner wl anchored aluminum billet
?'MD, BOL = 10100' MD
-13AL1 Al Pat TD = 10699' MD
F = 7357' ELMD
A stuck at 10462' MD
- 2-318" BHA (DAL = 68.39')
- 2" Coiled tubing (DAL = 3037)
'D= 10535' MD
ier wl anchored aluminum billet
1, BOL = 10347' MD
�- KUP PROD WELLNAME 3H -13A WELLBORE 3H-13AL1-02
ConoeoPhillips
Well Attributes
Max
Max Angle
gle&B)
TD
WaSka.lnr,
Flew Nane
KUPARUK RNER UNIT
wxte.;APwvn LWWBore stlnu
50103200&962 PROD 992]
'1,426.35
ACaMlrae)
LomTYRI
FIRIPpm1
Oale (Wpb6on EM Oah
NBGM(RT
BE Release Dale
150
12/22/2017 LnaWO.
37.01
1/9/1988
3HneALIN, I.IYA191SLE.PM
Last Tag
Vane9 xMma4c WAS)
An.....,OepIR
IRS.) El. (A.S.NWlbere
Last MW By
Last T89.
sooPn
Last Rev Reason
IMNOER. 270
Annouaon
End Dane
WeIIMR
IMW ay
Rev Reason: Added CID OneTl9p dISPOL NZG. 119. spots 1i/1.10
jennall
Casing Strings
Lasln9 nascnptlon OD pp
N pn) TeplNtBl eel Depth lrtltBl Set OepM (IWI..
yA'Len p_. erWe
Tep TM1mtl
AL1 -02 LINER 23]0
1.99 ],)21.9 9,4]3.0
460 LA0
STL
Liner Details
NominI ID
Top IRNa1
T pIND IRRBI
Top l
Ilem Des
Com
(in)
),Y219
5.9899
ISSR
0834
ALUMINUM
Aluminum Llner Top Biller
1920.
CONSORT. Eonpp
BILLET
NIPPLE, ams
Notes: General & Safely
Ena Dale
.mn..
12/138018
NOTE: Vfew Scdenwlk
wl Alaska Sc0emaod00
O96 LIFT'. 2720
I
SURFACE: So CS ON e—
GAS LIFT. a 11].6
ons UPT', E(R71
G46 uEP. E.]5].2
NIPPLE.E.O.
C
LOGATOR:5909.9
FA
SLAaby:5a120
n
WIMOW ERAS
PRCp1CTION POST W. ED
5.9]D.D
RPERF, ]2E.OT2J90—
TIGHT SPOT TORISO
(PERF, 125e.073ISO�
2 SET CTO LINER TOP: ] 257 9
TOFF SPOT. 73130
LINER, RFOS,F]]SS.G—
ALINUNER.].OS7IF7 NAS
ut LINER pW xn�M.�
]YA10,]s]D
..6
KIN U NEP: 7 MI 99073.9
. perations Summary (With Timelog L-pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Sdd repth
Stam Time
End True
DwM
cipcode
Atavly Code
TMe P -T -x
oposion
(mKB)
End Depth(aKB)
10/23/2018
10/23/2018
4.00
MIRU
MOVE
RURD
P
Work RD check list, prep injector &
0.0
0.0
09:30
13:30
reel for move, route inspection,
coordinate pre -rig work
10/23/2018
10/23/2018
6.50
MIRU
MOVE
RURD
P
Continue RD checklist, trucks to arrive
0.0
0.0
13:30
20:00
-19:00 his, continued coordiantion w/
pre -rig OPS, DTH notified to break
down tiger -tank line, disconnet hi -line
power
10/23/2018
10/23/2018
0.40
MIRU
MOVE
RURD
P
Peak sows on location spot trucks,
0.0
0.0
20:00
20:24
PJSM
10/2312018
10/23/2018
1.30
MIRU
MOVE
RURD
P
Jack service unit, attach sow and
0.0
0.0
20:24
21:42
move service unit to beginning of
access road. 10 minutes to pick up
service side mats, wind increasing
sharply. Some issues with hydraulic
systems at the outset, - 10-15 min
troubleshoot.
10/23/2018
10/23/2018
0.40
MIRU
MOVE
RURD
P
Jack sub, attach sow and stage
0.0
0.0
21:42
22:06
behind service unit. Pull cellar sills,
plywood, and herculite. Pad
inspection with pad operator/
company rep. Sign off on
environmental form.
10/23/2018
10/23/2018
0.50
MIRU
MOVE
RURD
P
Drop sows, attach jeeps, reattach
0.0
0.0..
22:06
22:36
-
tandem sows to service and sub.
Performed final walk around. Notify
security of eminent move.
10/23/2018
10/23/2018
0.60
MIRU
MOVE
MOB
P
Roll off pad @ 22:38 toward 31-1-13 -
0.0
0.0
22:36
23:12
17.5 miles
10/23/2018
10/23/2018
0.30
MIRU
MOVE
MOB
P
1.8 miles, at 2G access to spine road,
0.0
0.0
23:12
23:30
make sharp, off camber turn with
service and sub & continue toward 3H.
10/2312018
10/24/2018
0.50
MIRU
MOVE
MOB
P
Pass through CPF2, continue on
0.0
0.0
23:30
00:00
1toward 3H-14.
10/24/2018
10/24/2018
5.30
MIRU
MOVE
MOB
P
Complete move from 2G -Pad to 3H-
0.0
0.0
00:00
05:18
Pad
10/24/2018
10/24/2018
1.00
MIRU
MOVE
MOB
P
Crew change, drop jeeps, lay herculte,
0.0
0.0
05:18
06:18
pull tree cap
10/24/2018
10/24/2018
3.70
MIRU
MOVE
MOB
P
Begin spotting sub, remove platform
0.0
06:18
10:00
hand mils & raise BOP's to clear tree.
Thermal siphon blocking rig landing,
call out facilities w/cra{Q�e,. cut down
thermal siphon, continGe spotting sub,
raise BOP's to max height to clear tree
flange w/ BOP studs when setting
down off jack.
Spotted mats under sub
10/24/2018
10/24/2018
1.00
MIRU
MOVE
MOB
P
Spotted pits & laid mats, spotted TT
0.0
0.0
10:00
11:00
150' from rig
10/24/2018
10/24/2018
2.00
MIRU
MOVE
RURD
P
Begin RU check list, safe out walk
0.0
0.0
11:00
13:00
ways & landing, connect PUTZ, unlock
reel & injector, begin NU BOPE
Shop & 1/2 -Way House arrive on pad
& spotted
10/24/2018
10/24/2018
1.50
MIRU
WHDBOP
NUND
P
Continue RU checklist, complete NU
0.0
0.0
13:00
14:30
BOPE, MU TT hard-line
Rig Accept: 10124 @ 14:30 tire
10/24/2018
10/24/2018
2.00
MIRU
WHDBOP
RURD
P
Complte RU checklist
0.0
0.0-
14:30
16:30 I
Page 1139 ReportPrinted: 1112 012 01 8
.: , perations Summary (with Timelog ">pths)
3H-13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
smn Depm
SIm1Tme
and Time
Dw(hr)
Plena
opcade
Amvdy Code
Time P-T-x
opffl 4
(Po®)
BN Depen Mort
10124/2018
10/24/2018
2.00
MIRU
WHDBOP
BOPE
P
Fluid pack, perform shell test, leak at
0.0
0.0
16:30 -
18:30
wing valve flange, valve crew
attempting to solve issue, test gas
alarms. S/I swab #1 in an attempt to
bypass and move forward with BOP
test, will attempt to blind while we cut
coil. Crew change. Leek at bleeder
on test, panel, repair.
10/24/2018
10/24/2018
3.50
MIRU
WHDBOP
BOPE
P
Re-aftempt shell test, leak at bleeder
0.0
0.0
18:30
22:00
on the night cap, repair. Pressure up,
leak at wing valve bonnet post valve
crew tightening. Shut Swab 1 and
attempt to move forward, Swab one
leaking past, bleeding out bonnet on
wing valve. Vac slack, pull wing valve,
blind flow block, fluid pack.
10/24/2018
10/25/2018
2.00
MIRU
WHDBOP
BOPE
P
Shell test -good. Test BOPE's,
0.0
0.0
22:00
00:00
250/4900 psi 2500 psi annular,
(witnessed by Lou Laubenstein of the
AOGCC)
"•Start BOP test @ 22:00
Valve crew returned and grease
locked swab #1 after test #1 --10 min
@ startof test #4 pressures dropping
fast, -re-grease stack -11:30
10/25/2018
10/25/2018
4.70
MIRU
WHDBOP
BOPE
P
Complete-re-grease stack, 131
0.0
0.0
00:00
04:42
Fail/Pass on re-grease. - 52 minutes
total for Test #4
Had to exercise the annular a few time
to get it to hold. Completed draw
down.
10/25/2018
10/2512018
1.30
MIRU
WHDBOP
BOPE
P
Clear floor, test Inner reel iron
0.0
0.0
04:42
06:00
10/25/2018
10/25/2018
1.50
SLOT
WHDBOP
PRTS
P
PT PDL's & tiger tank line, clear floor,
0.0
0.0
06:00
07:30
slide in cart
BOP Test 9.5 hrs
10/25/2018
10/25/2018
1.00
SLOT
WELLPR
CIRC
P
PJSM, remove UCC, cut & seal a-line,
0.0
0.0
07:30
08:30
stab on, reverse circulate, up to 3.8
bpm, pop off
10/25/2018
10/25/2018
1.90
SLOT
WELLPR
CTOP
P
RU hydraulic cutter, cut off CTC, cut
0.0
0.0
08:30
10:24
500' of pipe, found a-line at 12', tested
e-line
10/25/2018
10/25/2018
1.80
SLOT
WELLPR
CTOP
P
Ream coil, instal CTC, pull test to
0.0
0.0
10:24
12:12
25K, head a-line, mistall UQC, PT to
4200 psi
1025/2018
10/25/2018
2.60
SLOT
WELLPR
CIRC
P
MU nozzle, stab on, circulate 1 coil
0.0
0.0
12:12
14:48
volume forward @ 2 bpm, begin PU
tools, put mill & motor in hole, add 1'
riser to stack for spacing out tools
1025/2018
10/25/2018
0.60
SLOT
WELLPR
CIRC
P
Clear all SIMOPS around TT, bleed IA
0.0
0.0
14:48
15:24
down to 500 psi, climbs back to 950
psi, bleed OA down to 679 psi
10/25/2018
10/25/2018
1.60
SLOT
WELLPR
PULD
P
PJSM, PU/PD BHA#1 Milling
0.0
51.0
15:24
17:00
Assemlby (2.72" stabalizer, BOT
straight motor, D331 ridge-set mill),
SSV not fully open, resolve
Mill 2.79" no go
10/25/2018
10/25/2018
1.20
SLOT
WELLPR
TRIP
P
RIH w/ BHA#1, EDC open, Getting
51.0
4,990.0
17:00
18:12
some gas back at surface.
10/25/2018
10/25/2018
0.20
SLOT
WELLPR
DLOG
P
Tie into unique peak above K1 for+ 1'
4,990.0
5,014.0
18:12
18:24
I
I
I
correction
Page 2/39 ReportPrinted: 1112012018
,. . perations Summary (with Timelog . pths)
IF m
14
3H -13A
..
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Cog
gat oepm
SMTm0
Fid Tkm
DIM
pha..e
op code
NAvdr code
Terse P -T -x
oceras^
(m(B)
End Depth(nNa)
10/25/2018
10125/2018
0.10
SLOT
WELLPR
TRIP
P
Continue to RIH.
5,014.0
5,206.0
18:24
18:30
10/25/2018
10/2512018
0.10
SLOT
WELLPR
DLOG
P
Logging again to appease the Geo. no
5,206.0
5,245.0
18:30
18:36
correction.
10/25/2018
10/2512018
1.50
SLOT
WELLPR
DISP
P
Continue in hole, slight CT Wt boble,
5,245.0
5,777.0
18:36
20:06
@ 5803', RIH to 5815' sat down, 4 k
WOB. PU 34 k lbs.
PUH slowly, ramp up rate from 0.9 to
1.75 bpm. Current losses 1.25 bpm to
the formation against an open choke.
Tum coil and well over to milling fluid.
10/25/2018
10/25/2018
1.00
SLOT
WELLPR
MILL
P
Close EDC, PU Wt 35 k bs, ramp
5,777.0
5,794.0
20:06
21:06
pump to milling rate.
CT 3014 psi @ 1.80 bpm in, 1.13 bpm
out, free spin diff 427 psi, WH 1 psi, IA
922 psi, OA770 psi.
CT Wt 17 k lbs, RIH, clean @ 5803'
no motor work or WOB.
Stall @ 5815', PU 34 k lbs, mill
through obstruction to 5825'.
Pick up through area, Clea, no motor
work
10/25/2018
10/25/2018
0.50
SLOT
WELLPR
MILL
P
Drift with pumps off
5,794.0
7037.0
21:06
21:36
10/25/2018
10/25/2018
0.40
SLOT
WELLPR
DLOG
P
Log the K1 for -10' correction.
7,037.0
7,104.0
21:36
22:00
10/25/2018
10/25/2018
0.20
SLOT
WELLPR
MILL
P
Continue to RIH dry, set down @
7,104.0
7,263.81
22:00
22:12
7263.81, WOB 1.6, PU Wt 40 k Ibs.
" Bleed IA to 775 psi - gas
10/25/2018
10/25/2018
0.60
SLOT
WELLPR
MILL
P
Milling tubing issue @ 7263.8'
7,263.8
7,379.0
22:12
22:48
CT 2961 psi @ 1.75 bpm in, 1.10 bpm
out, free spin 394 psi, IA776 psi OA
787 psi, WH 1 psi
CT Wt 19 k Ibs, Mill through easily,
PU, clean. Continue to RIH
10/25/2018
10/25/2018
0.40
SLOT
WELLPR
MILL
P
Set down @ 7379', PU 40 k lbs, RBIH,
7,379.0
7,400.0
22:48
23:12
saw nothing tis time, mill to 7,400' -
clean
10/25/2018
10/25/2018
0.20
SLOT
WELLPR
DLOG
P
PUH Wt 38 k lbs, PUH to 7082' and tie
7,400.0
7,099.0
23:12
23:24
into the K1 for a +1' correction
10/25/2018
10/26/2018
0.60
SLOT
WELLPR
DLOG
P
PUH to 5775' bit depth, logg CCL to
7,099.0
7,400.0
23:24
00:00
below planned WS set depth.
10/26/2018
10/26/2018
1.50
SLOT
WELLPR
DLOG
P
Continue to log CCL to below planned
7,099.0
7,400.0
00:00
01:30
WS set depth.
Time out 5x5 sweeps
10/26/2018
10/2612018
1.60
SLOT
WELLPR
TRIP
P
Park, open EDC, PU Wt 38 k lbs.
7,400.0
45.0
01:30
03:06
chase sweeps to bit then POOH.
10/26/2018
10/26/2018
1.40
SLOT
WELLPR
PULD
P
Bump up, bleed off pumps, open up at
45.0
0.0
03:06
04:30
the stack, flood up, flowchec observed
flow. Tag up, space out, PUD BHA#1
10/26/2018
10/26/2018
1.70
PROD1
RPEQPT
PULD
P
PU & PD BHA #2, 3.5 " monobore XL
0.0
73.0
04:30
06:12
whipstock, mill came out 2.79" no-go
10/2612018
10/26/2018
1.40
PROD1
RPEQPT
TRIP
P
RIH w/BHA #2, EDC open
73.0
7,090.0
06:12
07:36
10/26/2018
10/26/2018
0.20
PROD1
RPEQPT
DLOG
P
Log K1 for -9' correction, PUW = 34K
7,090.0
7,130.0
07:36
07:48
1026/2018
1026/2018
0.40
PRODT
RPEQPT
TRIP
P
Continue RIH, adrive at setting depth,
7,130.0
7,350.5
07:48
08:12
close EDC, PUW = 35K, bring up
pumps, sheard off WS @ 3700 psi, set
down 4K, TOWS -7340', oriented 30"
ROHS, set down 5K, good, PUW =
36K
Page 3139 ReportPrinted: 11/20/2018
Aerations Summary (with Timelog . pths)
3H -13A
'
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SU
Stait Time
End Time
Ekr(h1
Pheed
Op(.Ode
Activity Code
Time P -T-%
Opetaion
(Po®)
End Depth WS)
10/26/2018
10/26/2018
1.10
PROD1
RPEQPT
CIRC
P
Open EDC, pump 44 bbl 113K LSRV
7,350.5
7,342.0
08:12
09:18
pill, w/ 44 bbl out bit, bullhead 30 bbl
into perfs, bleeding down IA & OA
10/26/2018
10/2612018
1.70
PROD1
RPEQPT
TRIP
P
POOH, park at 535', flow -check well,
7,342.0
73.0
09:18
11:00
have flow, swap tools, pre -load PDL
(Unusual WOB values from DPS when
POOH), PJSM
10/26/2018
10/26/2018
1.00
PROD1
RPEQPT
PULD
P
PUD BHA#2
73.0
0.0
11:00
12:00
10/26/2016
10/26/2018
0.70
PRODt
WHPST
PULD
P
PD BHA #3 Window Assembly (0.6*
0.0
74.0
12:00
12:42
AKO motor, 2.80 string reamer, 2.80"
-
window mill),
10/26/2018
10/26/2018
0.80
PROD1
WHPST
RGRP
P
Allow Peter Obden time to adjust PLC
74.0
74.0
12:42
13:30
software on inj/reel (Rig Service)
10/26/2018
10/26/2018
0.80
PROD1
WHPST
PULD
P
Complete PD BHA#3, slide in car[,
74.0
74.0
13:30
14:18
changeout pack -offs, MU to coil, tag
up, set counters
10/2612018
10/2612018
1.30
PROD1
WHPST
TRIP
P
RIH w/BHA #3
74.0
7,105.0
14:18
15:36
10/26/2018
10/26/2018
0.10
PROD1
WHPST
OLOG
P
Log K7 for -9' correction, close EDC,
7,105.0
7,129.0
15:36
15:42
PUW = 36K
10/26/2018
10/26/2018
0.30
PROD1
WHPST
TRIP
P
Continue RIH, dry tag TOWS at
7,129.0
7,341.5
15:42
16:00
7342.2', PUW = 37K, tag pumping at
7341.5'
10/26/2018
10/26/2018
1.00
PROD1
WHPST
WPST
P
Milling window, 1.8 bpm, FS = 455 psi,
7,341.5
7,342.5
16:00
17:00
CWT = 18K, WOB = 1.3K, circ = 3335
psi, WHP = 0 psi, losses -10 bph
10/26/2018
10/26/2018
3.00
PROD1
WHPST
WPST
P
Milling window 1 ft/hr,
7,342.5
7,346.5
17:00
20:00
CT 3345 psi, 1.83 bpm in, 1.72 bpm
out, FS = 455 psi, WH 9, IA 731 psi,
OA 822 psi
CWT = 13K, WOB = 2.3, WOB fell off
sharply from 7345.5' with increase in
moto work
Losses 6 bph
10/26/2018
10/2612018
3.40
PROD1
WHPST
WPST
P
CT 3387 psi, 1.83 bpm in, 1.73 bpm
7,346.5
7,350.5
20:00
23:24
out, FS = 455 psi, WH 9, IA 735 psi,
OA871 psi
CWT = 15K, WOB = 0.75, Estimate
bottom of window 7347'
Losses 6 bph
10/26/2018
10/27/2018
0.60
PROD?
WHPST
WPST
P
Start drilling open hole
7,350.5
7,357.4
23:24
00:00
CT 3546 psi, 1.83 bpm in, 1.73 bpm
out, FS = 455 psi, WH 9, IA 738 psi,
OA 900 psi
CWT = 15K, WOB = 0.75,
Losses 6 bph
10/27/2018
10/27/2018
0.60
PROD1
WHPST
WPST
P
Drill rat hole @ 8-15 Whir.
7,357.4
7,362.0
00:00
00:36
Losses 3 bph
Bleed OA from 900 psi to 627 psi
Bleed IA from 740 psi to 680 ps
10/27/2018
10/27/2018
1.80
PROD1
WHPST
WPST
P
Performed reaming passes, as milled
7,362.0
7,362.0
00:36
02:24
30 'ROHS, HS, 60, and 210' ROHS.
Small, diminishing, spike in motor
work @ -7342' on the first 4 passes.
-515 Ib WOB lug at 7345' on up pass
at 210 *ROHS.
Dry drift - clean, tag rat hole bottom
Losses 3 bph
Page 4139 ReportPrinted: 11/20/2018
aerations Summary (with Timelog . .pths)
3H-13A
..
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Slant Time
End Tine
DwM
%use
Op Code
A ity Code
Time P-T-X
OPMEOn
rt Dept,
S (nKB)
1
End Daps ()
10/27/2018
10/27/2018
0.40
PROD1
WHPST
DISP
P
PU Wt 38k PUH, park, open EDC,
7,362.0
7,287.0
02:24
02:48
pump 10 bbl sweep, chase with new
mud @ 2.20 bpm in, 2.06 bpm out,
open choke, WH 16 psi. displace
sweep to wellbore.
10/27/2018
10/27/2018
1.30
PROD1
WHPST
DISP
P
POOH chasing sweep to surface while
7,362.0
60.0
02:48
04:06
displacing wellbore to new mud -
System #1
Choke acting up, most likely window
cuttings.
10/27/2018
10/27/2018
1.30
PROM
WHPST
PULD
P
PJSM, Bump up, space out, PUD &
60.0
0.0
04:06
05:24
LD BHA#3, window milling assembly.
10/27/2018
10/27/2018
0.70
PROD1
DRILL
CIRC
P
Jet stack
0.0
0.0
05:24
06:06
10/27/2018
10/27/2018
3.10
PROD1
DRILL
PULD
T
PU & PD BHA #4, AL1 build/turn
0.0
0.0
06:06
09:12
drilling assembly (2.5 'AK motor with
RB Baker bit), check pack offs
Hung up high-bend motor working
through stack & past swab/master,
work to free BHA, pull back up into
PDL, pop off lubricator, re-grease
motor, index bit to correct orientation,
pour 5 gal LVT down slack, complete
PD
10/27/2018
10/27/2018
1.50
PROD1
DRILL
TRIP
P
RIH w/ BHA #4
0.0
7,090.0
09:12
1042
10/27/2018
10/27/2018
0.10
FROM
DRILL
DLOG
P
Log K1 for-8.5' correction
7,090.0
7,108.0
10:42
10:48
10/27/2018
10/27/2018
0.60
PROD1
DRILL
TRIP
P
Continue RIH, close EDC, PUW =
7,108.0
7,362.0
10:48
11:24
37K, pull into cased hole to trouble-
shoot DD's HSTF values, RBIH
10/27/2018
10/27/2018
1.60
PROD1
DRILL
DRLG
P
Drilling, 1.8 bpm in, 1.66 bpm out, FS
7,362.0
7,512.0
11:24
13:00
= 550 psi, CWt = 15.4K, WOB = 2.4K,
circ = 3281 psi, BHP = 3469 psi, WHP
= 160 psi, bump up from 11.2 ppg to
11.3 ppg, losses healing, returns =
95%, avg ROP = 93 fph
" RA tag = 7347', TOWS = 7340',
BOW = 7347'
10/27/2018
10/27/2018
3.10
FROM
DRILL
DRLG
P
Drilling, 1.8 bpm in, 1.7 bpm out, 11.4
7,512.0
7,670.0
13:00
16:06
ppg at window, CWT= 11.8K, WOB =
1.8K, BHP = 3581 psi, circ = 3378 psi
EOB called at 7670'
10/27/2018
10/27/2018
0.50
PROM
DRILL
DLOG
P
Log K1 for +1' correction, confirm RA
7,670.0
7,370.0
16:06
16:36
at 7347'
10/27/2018
10/27/2018
1.30
FROM
DRILL
TRIP
P
POOH, EDC open
7,370.0
72.0
16:36
17:54
10/27/2018
10/27/2018
1.30
PROM
DRILL
PULD
P -
Bump up, Space out, Crew change,
72.0
0.0
17:54
19:12
PUD BHA #4, AL1 buildlturn drilling
assembly.
10/27/2018
10/27/2018
1.00
FROM
DRILL
PULD
P
PU & PD BHA#5, AL1 lateral drilling
0.0
65.9
19:12
20:12
assembly, 0.5° AKO W HYC A2 RR
bit, Check 7 replace pack offs. Bump
up, set counters and away we go!
10/27/2018
10/27/2018
1.40
PROD1
DRILL
TRIP
P
RIH, Park @ 500' and shallow test
65.9
7,090.0
20:12
21:36
agitator,grab screen shots.
BPM Diff psi Frequency Hz
1.0 380 20.4
1.5 800 15.0
1.8 1244 1244
Page 5139 Report Printed: 11120/2018
. perations Summary (with Timelog pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Slmt7xna
Entl Tine
Dur (Td
PhaseOp
Code
Activity Code
Time P -M
Operation
B (fiKBP�
EndDepth flKB
f )
10/27/2018
10/27/2018
0.20
PROD?
DRILL
DLOG
P
Tie into the K1 for a -9.5' correction.
7,090.0
7,114.5
21:36
21:48
10/27/2018
10/272018
0.30
PROD1
DRILL
TRIP
P
PU Wt 35 k lbs, continue to RIH.
7,114.5
7,670.0
21:48
22:06
Widow & build clean.
10/27/2018
1012812018
1.90
PROD1
DRILL
DRLG
P
CT 4183 psi @ 1.84 bpm in, 1.70 bpm
7,670.0
7,890.0
22:06
00:00
out, Free spin diff 1470 psi, annular
3644 psi, WH 194 psi, IA 684 psi, OA
666 psi. Mud conditioned down
quickly, picked up to reacquire
numbers
CT 4017 psi @ 1.83 bpm in, 1.73 bpm
out, free spin 1113 psi.
CT Wt 11 k Ib, WOB 2.2 k lbs, ROP
100 fl/hr.
7920' PU Wt 39 k lbs, pump 5x5
low/high sweep
Average ROP 115 ft/hr
10/28/2018
10/28/2018
1.40
PROD1
DRILL
DRLG
P
CT 4183 psi @ 1.84 bpm in, 1.70 bpm
7,890.0
8,070.0
00:00
01:24
out, Free spin diff 1470 psi, annular
3644 psi, WH 194 psi, IA 684 psi, OA
666 psi. Mud conditioned down
quickly, picked up to reaquire numbers
CT 4017 psi @ 1.83 bpm in, 1.73 bpm
out, free spin 1113 psi.
CT Wt 11 k Ib, WOB 2.2 k lbs, ROP
100ft/hr.
7920' PU Wt 39 k lbs, pump 6x5
lowthigh sweep
Average ROP 128 ft/hr
1028/2018
10/28/2018
0.20
PROD1
DRILL
WPRT
P
PU Wt 39 k lbs
8,070.0
7,673.0
01:24
01:36
400'wiper#1
10282018
10/28/2018
0.20
PROD?
DRILL
WPRT
P
RBIH
7,673.0
8,070.0
01:36
01:48
RIH Wt 16 k lbs
10/28/2018
1028/2018
0.70
PROD1
DRILL
DRLG
P
CT 4252 psi @ 1.83 bpm in, 1.73 bpm
8,070.0
8,235.0
01:48
02:30
out, Free spin diff 1261 psi, annular
3684 psi, WH 202 psi, IA 691 psi, OA
724 psi.
CT Wt 5.6 k Ib, WOB 2.7 k lbs, ROP
245 ft/hr.
Average ROP 235 ft/hr
10/28/2018
1028/2018
2.10
PROD1
DRILL
DRLG
P
Hit something hard 8235', PU and
8,235.0
8,425.0
02:30
04:36
restart, PU Wt 42 k lbs
CT 4563 psi @ 1.83 bpm in, 1.74 bpm
out, annular 3680 psi,
CT Wt 5.8 k Ib, WOB 2.5 k lbs, ROP
16 -200 fl/hr.
Drilled through@ 8241' took a little
influx, pinched in choke to 11.8 at the
window.
1.83 bpm in, 1.72 bpm out
Average ROP 90 it/hr
10/28/2018
10/28/2018
0.20
PROD1
DRILL
WPRT
P
PU Wt 41 klbs
8,425.0
7,680.0
04:36
0448
745'wiper#2
10/282018
10/28/2018
0.20
PRODt
DRILL
WPRT
P
RBIH
7,680.0
8,425.0
04:48
05:00
RIH Wt 16 k lbs
10/2812018
1028/2018
1.00
PROD1
DRILL
DRLG
P
CT 4245 psi @ 1.79 bpm in, 1.69 bpm
8,425.0
8,512.0
05:00
06:00
out, 1,162 free spin diff, annular 3784
psi,
CT Wt 8.8 k to, WOB 2 k IDS, ROP 135
ft/hr, PUW = 45K, crew change
Page 6/39 Report Printed: 11/2012018
perations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
struma
End Time
Our (M)
Phase
OP Code
Activity Code
Time P -T -X
Opaati,
SmdONdt
(F5
End Depth8,6 (0.0
10/28/2018
10/28/2018
2.00
PROD1
DRILL
DRLG
P
Drilling, FS = 1138 psi, CWT = 0.5K,
8,512.0
6,600.0
06:00
08:00
WOB = 1.2K, BHP = 3753 psi, W HP =
240 psi, circ = 4313 psi, -93% returns,
pump 5x5 sweeps, lower ROP through
125 API lithology (down'to 40 fph),
Avg ROP 44 fph
10/28/2018
10/28/2018
2.00
PROD1
DRILL
DRLG
P
Drilling, CWT =3.3K, WOB =1.5K,
8,600.0
8,684.0
08:00
10:00
BHP = 3764 psi, circ = 4470 psi, -91%
retruns, continued lower ROP (45 - 70
fph), drilling w/ negative CWT, PUW's
_-44K-46K, Avg ROP 42 fph
10/28/2018
10/28/2018
0.60
PROM
DRILL
WPRT
P
Wiper up -hole to window, chasing
8,684.0
7,080.0
10:00
10:36
sweeps, PUW = 48K
Pulled early to allow Peter O'brien
chance to verify ini/mel changes &
reboot software update prior to leaving
slope, & clean up higher gamma silt
interval
10/28/2018
10/28/2018
0.20
PROD1
DRILL
DLOG
P
Log K1 for+4' correction
7,080.0
7,120.0
10:36
10:48
10/28/2018
10/28/2018
0.30
PROM
DRILL
SVRG
PPeter
verifies inj/reel changes &
71120.0
7,120.0
10:48
11:06
reboots software, software install
complete (shut -down pump, shut-in
choke)
10/28/2018
10/28/2018
0.90
PROD1
DRILL
WPRT
P
Wiper in -hale, RIW = 10.3K, BHP
7,120.0
8,684.0
11:06
12:00
spiked at 8687', PUW = 44K, line-up
to choke A, RBIH, stacking weight
beginning at 8625' up through Iowa Al
silt
10/28/2018
10/28/2018
2.00
PROD1
DRILL
DRLG
P
BOBD, CWT= -7K, WOB =1.I K, BHP
6,684.0
8,920.0
12:00
14:00
= 3783 psi, W HP = 275 pis, circ =
4367 psi
CWT coming back drilling past higher
gamma interval, drilling break at
-8760', Avg ROP 118 fph
Blew -down choke B, medium sized silt
cavings observed
10/28/2018
10/28/2018
1.70
PROD1
DRILL
DRLG
P
Drilling, CWT = 4.3K,WOB = 1.8K,
8,920.0
9,085.0
14:00
15:42
BHP = 3830', circ = 203 psi, BHA
wiper from 8955', PUW = 42K, pump
5x5 sweeps
10/28/2016
10/28/2018
0.30
PROD1
DRILL
WPRT
P
Wiper up -hole, PUW =42K
9,085.0
8,265.0
15:42
16:00
10/28/2018
10/28/2018
0.80
PROD1
DRILL
WPRT
P
Wiper in-hole, stack weight at 8349',
8,265.0
9,085.0
16:00
16:48
PU, RBIH, stacking weigt at 8390' to
8442', up to -2.7K WOB on PU's,
pump HiVis sweeps, continue stacking
through to 8635', PUW = 52K
Bore & annular climbing, begin
packing off, PUH, pulling heavy
through to 8500'(-5K WOB),
reciprocate to work off packoff, pulled
up to 65K
10/28/2018
10/28/2018
2.00
PROD?
DRILL
TRIP
T
Pull to window, building sweeps,
9,085.0
7,233.0
16:48
18:48
circulate bottoms up, pump, large
amounts off large cavngs returned to
the shaker.
Page 7/39 Report Printed: 11/20/2018
perations Summary (with Timelog . _pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time log
Sdrtrima
Eq Tire
drtnr)
phase
Op catla
AWAY cane
rens P -r -x
opera§M
San Depth
MM
Ea Depth tea)
10/28/2018
10/2812018
2.00
PROD1
DRILL
CIRC
T
RIH, window and build clean, turned
7,233.0
7,220.0
18:48
20:48
around in middle of build, pulled to just
below window, RBIH to EOB, clean,
pull to just below window chasing 5x5
sweep, clean - sweep carried 1/8"
caving's to surface,
RBIH to 7780, trip in was clean.
PU Wt, 36 k lbs, dean, Pull -4k WOB
@ 7760', RBIH, SID @ 7667' 4.5K
WOB, PU 52 K, 4.5 k WOB, pop free.
Tum around at 7737' RBIH to 7780'
clean, PU 36 k lbs, 4.3 k lbs WOB @
7759' again. Tum around @ 7579',
RBIH, to 7781', pull 10 it/min, pumping
1.8 bpm, -Cleanl
Build clean window clean.
10/28/2018
10/28/2018
1.80
PROD1
DRILL
TRIP
T
Continue out of hole, chase three
7,220.0
70.0
20:48
22:36
separate 5x5 sweeps timed to exit at
Window, 3000', and surface.
Diminishing solids returns each time.
Perform shallow jog at surface, Pre
load PDL while POOH.
Last sweep at surface was clean.
10/28/2018
10/29/2018
1.40
PROD1
DRILL
PULD
T
Bump up, PUD and LD BHA # 5. Bit
70.0
0.0
22:36
00:00
graded 1,1, NO
10/29/2018
10/29/2018
1.40
TROO1
PULD
T
PU & PD BHA #6, Billet W open hole
0.0
70.0
00:00
01:24
anchors.
10/29/2018
10/29/2018
1.30
PROD1
STK
TRIP
T
RIH
70.0
7,090.0
01:24
02:42
10/29/2018
10/29/2018
0.20
PROD1
STK
DLOG
T
Tie into the K1 marker for -8'
7,090.0
7,123.4
02:42
02:54
1
correction.
10/29/2018
10/29/2018
0.50
PROM
STK
WPST
T
Continue in hole, PU Wt 37 k @
7,123.4
7,756.8
02:54
03:24
7285', park, down on pump,
Close EDC, continue in hole, Window
and build clean.
Park on depth, PU 30k to neutral CT
Wt, Online w pump, observe sheer @
4600 psi.
Stack 3 k WOB on billet, PU Wt 36 K
10/29/2018
10/29/2018
1.50
PROD1
STK
TRIP
T
PU Wt 36 K
7,756.8
70.0
03:24
D4:54
PUH, Open EDC, Continue out of
hole.
10/29/2018
10/29/2018
1.40
PRO
STK
PULD
T
Bump up, PUD & LD BHA #6. Crew
70.0
0.0
04:54
06:18
change.
10/29/2018
10/29/2018
1.30
PROD1
STK
PULD
T
PD BHA#7 KO/Lateral Assembly
0.0
73.0
06:18
07:36
(NOV agitator, 0.5°AKO motor, RB
P104 bit), slide in cart, MU to coil, tag
up, set counters
10/29/2018
10/29/2018
1.40
PROM
STK
TRIP
T
RIH w/ BHA *7, close EDC, shallow
73.0
7,090.0
07:36
09:00
test @ 645' & grab transducer
screenshot, 1.8 bpm, circ = 4430 psi,
FS = 1070 psi
10/29/2018
10/29/2018
0.20
PROD1
STK
DLOG
T
Log K1 for -8' correction, PUW = 34K
7,090.0
7,134.0
09:00
09:12
10/29/2018
10/29/2018
0.70
PROD1
STK
TRIP
T
Continue RIH, dry tag TOB at 7746.5',
7,134.0
7,745.8
09:12
09:54
PUW = 38K, pumping 1.8 bpm, milling
at 7745.8'
10/29/2018
10/29/2018
0.30
PROD1
STK
KOST
T
Milling, pumping 1.82 bpm, FS = 1070
7,745.8
7,754.4
09:54
10:12
psi, CWT = 16.2K, WOB =.I K, BHP
= 3608 psi, WHP = 112 psi, circ =
4247 psi
WOB & motorwork milling off
immediatley,
begin chasing to find any
WOB, not seeing WOB or motorwork
Page 8139 ReportPrinted: 11120/2018
aerations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SW Tone
End Tyne
OorM
phase
Op Code
Acift Code
Time P -T -x
opgetion
stedoepth
il")
End Dpth(MO)
10/29/2018
10/29/2018
0.10
PR551
STK
KOST
T
PUH, PUW = 37K, RBIH to dry tag
7,754.4
7,756.0
10:12
10:18
billet & troubleshot issue, tag TOB
7752.8', a lot of aluminum over
shakers
10/29/2018
10/29/2018
0.80
PROD1
STK
KOST
T
Go back to milling, stall getting going,
7,756.0
7,762.0
10:18
11:06
milling from 7756', CWT = 13K, WOB
= 1.36K, dip = 1476 psi, chasing WOB
to get away from billet, stall at
7758.4' (approx slips depth), PUW =
42K, drill to 7762' & stall (up to 115
fph), PUW = 38K, begin dragging -4K
WOB at 7755', RBIH & stall at 7758',
RBIH, packing off, rate out falls to 0
bpm out
10/29/2016
10/29/2018
0.40
PRODi
DRILL
CIRC
T
Packed off at MM beginning at 7752',
7,762.0
7,329.0
11:06
11:30
PUH to above billet w/ no returns, no
over pull or negative WOB, large
caving appear over shaker, pump
10x10 sweeps working PUH to cased
hole, packed off again at
7617' (believe at surface), blow down
choke B, swap over, packed off
immediately in cased hole (believe
packed off at surface).
10/29/2018
10/29/2018
0.80
PROM
DRILL
CIRC
T
Blow down, choke A&B, blowdown
7,329.0
7,030.0
11:30
12:18
MM & snake, back on choke B,
packed off, BHP climbing, chokes by-
passed as both are packed off, open
MP lines to check pressures to
determine pack -off location, see 1200
psi on MP line, pack -off likely in return
line. Confer w/ town, decision made to
reduce pump rate.
10/29/2018
10/29/2018
1.00
PROD1
DRILL
CIRC
T
Slowly PUH, formulate plan to reverse
7,030.0
6,856.0
12:18
13:18
circulate through return line: shutdown
pumps, close lower 2" pipe -slip rams,
close SR 1 & SR2, close R8, open
RC1 & RC2, bleed off above rams
through riser, MU 2" 90 on riser. Pump
back & have communication through
return line hose. Line up down coil,
have returns, though quickly re -pack
off
10/29/2018
10/29/2018
1.20
PROM
DRILL
CIRC
T
Bi -pass chokes & MM, pump at 1.9
6,856.0
6,841.0
13:18
14:30
bpm (11.14 prig at window), pump
sweeps, circulate bottoms up, blow
down chokes A & B, snake MM &
button back up. Have returns, chokes
& MM are all cleared.
10/29/2018
10/29/2018
0.20
PROD1
DRILL
DLOG
T
Log, K1 for +.5' correction
6,841.0
7,340.0
14:30
14:42
_
10/2912018
10/29/2018
0.80
PROD1
DRILL
CIRC
T
RIH to TOB, pump 5x5 sweeps, chase
7,340.0
7,340.0
14:42
15:30
1
to TOWS, circulate bottoms up
10/29/2018
10/29/2018
0.20
PROM
DRILL
TRIP
T
RBIH to TOB, drop pumps, tag at
7,340.0
7,758.0
15:30
15:42
7759', PUW = 35K (approximate depth
of slips)
10/29/2018
10/29/2018
1.50
PROD1
DRILL
TRIP
T
RBIH, 1.8 bpm at —3.5 fph, pass
7,758.0
7,762.4
15:42
17:12
7758', continue in slow to 7762', BHP
= 3775 psi, WHP = 249 psi, CWT =
15.5K, WOB=.25K, increasing WOB
& motonvark from 7761'
Page 9139 Report Printed: 11/20/2018
derations Summary (with Timelog . pths)
3H-13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Tine
EW line
Dff(hn
Ruse
op CMD
Ach*Cade
Time P-T.X
opmbw
SW DepN
MM)
EM Depin(MB)
10/29/2018
10/29/2018
1.30
PROD?
DRILL
DRLG
T
Drilling from 7762.4', CWT= 16K,
7,762.4
7,772.0
17:12
18:30
WOB = 1.4K, dp = 1360 psi, WOB
spiking to 2.4K, then falling off,
increase ROP to 112 fph, seeing little
WOB, PUH above billet, PUW =44K,
RBIH to tag bottom (If in old hole
should now know)
10/29/2018
10/29/2018
0.60
PROD1
DRILL
DRLG
T
Drilling, CWT =7K, WOB =2.4K,BHP
7,772.0
7,848.0
18:30
19:06
= 3748 psi, WHP = 152 psi, NBI
indicates getting away from old hole
10/29/2018
10/29/2018
0.40
PROD1
DRILL
TRIP
T
Dry drift billet area up & down, clean,
7,848.0
7,848.0
19:06
19:30
PUW = 48K, short -1.8K WOB spike at
7805'
10/292018
10/2912018
2.20
PROM
DRILL
DRLG
T
Drilling, CWT= 1OK, WOB = 1.7K,
7,848.0
8,181.0
19:30
21:42
BHP = 3721 psi, WHP = 138 psi, -
97% returns, pumps 5x5 sweeps, Avg
ROP 151 fph
Swap to mud system #2, new mud at
bit 7912'
10/292018
10/292018
0.30
PROD1
DRILL
WPRT
T
Wiper up-hole, PUW =38K
8,181.0
7,780.0
21:42
22:00
10/29/2018
10/29/2018
0.30
PROD1
DRILL
WPRT
T
Wiper in-hole, RIW = 16K
7,780.0
8,181.0
22:00
22:18
10/29/2018
10/30/2018
1.70
15ROD1
DRILL
DRLG
T
Drilling, 1.8 bpm, CWT= 11K, WOB =
8,181.0
8,486.0
22:18
00:00
2K, BHP = 3737 psi, WHP = 335 psi,
circ = 4500 psi, drop to 1.5 bpm to
allow DD to grab survey
10/30/2018
10/30/2018
0.60
PRODt
DRILL
DRLG
T
OBD, CT Wt 8 k be, 1.6 k WOB,
8,486.0
8,565.0
00:00
00:36
holding 11.8 ppg @ the window
WH 246 psi, IA 690 psi, OA 740 psi
PU 8553'44 k
free spin on restart 1006 psi
10/30/2018
10/30/2018
0.20
PROD1
DRILL
WPRT
T
PU Wt 37 k Ibs, Wiper trip #2-800'
8,565.0
7,790.0
00:36
00:48
Drag neg WOB, -1.68 K lbs, @ 7800'
10/30/2018
10/30/2018
0.30
PROD1
DRILL
WPRT
T
RBIH
7,790.0
8,565.0
00:48
01:06
Stack out 7792'4.7 K WOB, 7804'3.3
k WOB, and 7816'2.3 k WOB,
bounced on don, didn't pick up.
Clean the rest of the way to bottom.
10/30/2018
10/30/2018
1.00
PROD1
DRILL
DRLG
T
CT 4200 psi @ 1.79 bpm in 1.74 bpm
8,565.0
8,704.0
01:06
02:06
out, free spin diff 1027 psi, CT RIH Wt
16 k lbs, annular 3800 psi
OBD, CT Wt 6 k lbs, WOB 1.94 k lbs,
10/302018
10/30/2018
2.00
PROD1
DRILL
DRLG
T
8,706' PU WT 45k lbs - Something
8,704.0
8,770.0
02:06
04:06
hard, ROP fell to 23 ft/hr
CT Wt 4.8 k lbs, WOB 2.30 k bs, ROP
33 N hr - most likely found the fault
Gamma climbed rapidly to 143 API
max 153, seeing soft clay balls at the
shaker.
10/302018
10/30/2018
0.70
PROD1
DRILL
DRLG
T
Drilling break, Gamma claned up and
8,770.0
8,877.0
04:06
04:48
resistivity returned to normal.
10/302018
10/302018
0.30
PROD1
DRILL
DRLG
T
On another hard spot. ROP down to
8,770.0
8,878.0
04:48
05:06
10 f/hr.
10/302018
10/3012018
0.50
PROM
DRILL
DRLG
T
Drilling break and losses, 1.78 in, 1.34
8,878.0
8,965.0
05:06
05:36
bpm out, slowly healing
PU 39 k RBIH,
10/30/2018
10/3012018
0.60
PROD1
DRILL
WPRT
T
PU Wt 40 k lbs, Wiper trip #3 to
8,965.0
7,358.0
05:36
06:12
window for tie in.
10/30/2018
10/30/2018
0.20
PROM
DRILL
DLOG
T
Tie into the RA tag for+2' correction.
7,358.0
7,392.0
06:12
06:24
10/30/2018
10130/2018
0.60
PROD1
DRILL
WPRT
T
RBIH
7,392.0
8,965.0
06:24
07:00
Page 10139 Report Printed: 11/2012018
Aerations Summary (with Timelog - _pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
sranrme
End Tore
DmIhn
Phase
Op Code
Activity Cade
T. P -T -x
operation
S(ftKB)N
End Dr?dt (11103)
10/30/2018
10/30/2018
0.90
PROD1
DRILL
DRLG
T
Ct 4637 psi, @ 1.83 bpm in, 1.76 bpm
8,965.0
9,085.0
07:00
07:54
out, Free spin diff 1123 psi, annular,
3824 psi, IA 703, Oa 784 psi
CT WT 7 k lbs, WOB 1.86 k lbs
9053' PU Wt 39 k lbs
Average WOB.
10/30/2018
10/30/2018
2.00
PROD1
DRILL
DRLG
P
Drill ahead
9,085.0
9,365.0
07:54
09:54
9191' PU Wt 52 k lbs, pump 5x5
sweep and pul BHA Wper, RBIH
ROP increased from 100 to 240 as
sweep exited, adding 1% 776 to high
vis
10/30/2018
10/3012018
0.30
PROD1
DRILL
WPRT
P
PU Wt 40 k lbs, Wiper trip #1 - 800'
9,365.0
8,565.0
09:54
10:12
10/30/2018
10/30/2018
0.30
PROD1
DRILL
WPRT
P
RBIH,
8,565.0
9,365.0
10:12
10:30
S/D 8786', PU and try to work through
x3, no luck
Rolled TF from HS to as drilled, RIH
no issue
10/30/2018
1O 0/2018
4.40
PRODt
DRILL
DRLG
P
Ct 4784 psi, @ 1.82 bpm in, 1.76 bpm
9,365.0
9,765.0
10:30
14:54
out, Free spin diff 1219 psi, annular,
3838 psi, IA 703, Oa 797 psi
CT WT 5 k lbs, WOB 1.58 k Ibs
10/30/2018
10/30/2018
0.30
PR001
DRILL
WPRT
P
PU Wt 39 k His, Wiper trip #2 - 800'
9,765.0
8,958.0
14:54
15:12
10/30/2018
10/30/2018
0.30
PROD1
DRILL
WPRT
P
RBIH, clean
8,958.0
9,765.0
15:12
15:30
10/30/2018
10/30/2016
4.00
PROD1
DRILL
DRLG
P
Ct 4859 psi, @ 1.81 bpm in, 1.69 bpm
9,765.0
9,969.0
15:30
19:30
out, Free spin diff 1062 psi, annular,
3909 psi, WH 191, IA 707, OA 809
psi, CT WT 3 k lbs, WOB 1.1 k lbs -
ROP 30 -100 ft/hr
10/30/2018
10/30/2018
0.60
1 PROD1
DRILL
WPRT
P
Geo wiper, PUW=43K
9,969.0
9,969.0
19:30
20:116
10/30/2018
10/3672018
1.90
FROM
DRILL
DRLG
P
Drilling, 1.8 bpm, CWT = -1.5K, WOB
9,969.0
10,062.0
20:06
22:00
= 1.35K, BHP = 3902 psi, WHP = 162
psi, PU's to continue drilling, Avg ROP
49 fph
Mud Swap to system #3, hit bit at
10,026'
10/30/2018
10/30/2018
1.50
PROD1
DRILL
DRLG
P
Drilling, 1.8 bpm, CWT= 2K, WOB =
10,062.0
10,200.0
22:00
23:30
1.3K, BHP = 3890 psi, WHP = 306 psi,
circ = 4768 psi, pump 5x5 sweeps,
03012016
10/31/2018
0.50
PROD1
DRILL
WPRT
P
Begin wiper to window, PUW=40K
10,200.0
8,775.0
2
23::30
00:00
10/31/2018
10/31/2018
1.50
PROD1
DRILL
WPRT
P
Continue wiper towindow, rate out
8,775.0
7,360.0
00:00
01:30
drops, packing off, RBIH, stack WOB
at 8775', unable to move down or up,
sit at just over PUW, pumpiing, allow
pack -off to erode, pull free, silt -stone
over shakers from lagged depth of
8775', slow down, pump 5x5 sweeps,
circulate sweeps to surface.
10/31/2018
10/31/2018
0.10
PROD1
URFILL
DLOG
P
Log RA for+4'correction
7,360.0
7,380.0
01:30
01:36
10/31/2018
10/31/2018
1.20
PROD1
DRILL
WPRT
P
Wiper in-hole, ran through trouble7,380.0
10,200.0
01:36
02:48
interval
8750 - 8775' at min rate, saw
1.6K WOB at 8761', then fell off, RIW
= 5K
Page 11/39 ReportPrinted: 11/20/2018
: perations Summary (with Timelog ..pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
St Tme
EMTme
DxM
poria
opcoda
AWrry Code
tone P -r -x
Dpwafm
��lh
0")
EM Deps+(m(3)
10/31/2018
10/31/2018
2.20
PROD1
DRILL
DRLG
P
Drilling, 1.8 bpm, FS = 1090 psi, CWT
10,200.0
10,356.0
02:48
05:00
= 2K, WOB = 1K, BHP = 3900 psi,
WHP = 259 psi, circ = 4736 psi, PUW
= 48K from 10,293', PUW = 54 from
10,331-
10/3112018
10/31/2018
4.80
PROD1
DRILL
DRLG
P
Drilling, CWT= -0.5K, WOB=1K,
10,356.0
10,535.0
05:00
09:48
BHP =3949 psi, WHP=289 psi, circa
= 4822 psi
10/31/2018
10/31/2018
3.20
PROD1
DRILL
WPRT
P
Geo called TD@ 10535'
10,535.0
78.0
09:48
13:00
PU WT 40 k lbs - launch 10x10 TD
sweeps, while PUH slowly.
Increase to normal POOH rate and
chase sweeps to surface.
Time tow additional 5x5 sweeps for
the trouble area @ 8700' and the
build.
Saw some motor work @ 8713',
continued out of hole
Lots of very small but fresh cavings at
2300 bit depth, surged well near
surface, quite a bit of aluminum and
some larger, more rounded rocks at
the shaker.
10/3112018
10/31/2018
1.30
PROD1
DRILL
TRIP
P
RBIH
398.0
7,080.0
13:00
14:18
10/31/2018
10/31/2018
0.20
PROD1
DRILL
DLOG
P
Tie into K1 for -8.5' correcion.
7,080.0
7,163.0
14:18
14:30
10/31/2018
10/31/2018
0.20
PROD1
DRILL
DLOG
P
Park @ 7326 09 CTMD, 5953.08'
7,163.0
7,326.0
14:30
14:42
TVD
Trap 3763 psi
1 min 3683 psi 11.89 ppg
2 min 3632 psi 11.80 ppg
3 min 3632 psi 11.73 ppg
4 min 3612 psi 11.61 ppg
5 min 3588 psi 11.59 ppg
10/31/2018
10/31/2018
1.80
PROD1
DRILL
TRIP
P
Continue to RIH, window, build, and
7,326.0
10,328.0
14:42
16:30
falut at 8700' clean
10/31/2018
10/31/2018
2.30
PROD?
DRILL
DISP
P
POOH displacing well to liner running
10,328.0
78.2
16:30
18:48
pill - 52 bbls top of pill 4400'.
Painted Yellow flag 8478.4'
10/31/2018
10/31/2018
0.50
PROD1
DRILL
OWFF
5
At surface, check well for flow (no-
78.2
78.2
18:48
19:18
flow), PJSM
. 10/31/2018
10/31/2018
0.45
PROD1
DRILL
PULD
P
LO drilling assembly on a dead well
78.2
0.0
19:18
19:45
10/31/2018
10/31/2018
0.30
PROD1
DRILL
OTHR
P
Perform Function test on BOP stack.
78.2
19:45
20:03
(good test), LD test joint
10/31/2018
10/31/2018
0.40
COMPZ1
CASING
PUTB
P
Prep RF for liner ops, PJSM
0.0
0.0
20:03
2027
10/31/2018
10/31/2018
2.75
COMPZI
CASING
PUTB
P
PU 55 joints of slotted liner with non-
0.0
1,840.7
20:27
23:12
ported bullnose and shorty
deployment sleeve.
10/31/2018
10/31/2018
0.25
COMPZ1
CASING
PUTB
P
RD liner running equipment
1,840.7
1,840.7
23:12
23:27
10/31/2018
1111/2018
0.55
COMM
CASING
PULD
P
PJSM, PU1MU CoilTrak tools,
1,840.7
1,884.9
23:27
00:00
(hanging dg hook -load 21.49 k),
spaceout, close 2-3/8" on tool string,
bring cart forward
11!112618
11/1/2018
0.45
COMPZI
CASING
PULD
P
Swap out float valves in UQC, stab
1,884.9
1,884.9
00:00
00:27
INJH, surface test BHI CoilTrak tools
(good -test), function open rams, tag
up, reset counters
11/1/2018
11/1/2018
1.44
COMPZI
CASING
RUNL
P
RIH w/liner segment#1
1,884.9
7,296.1
00:27
01:53
Page 12139 ReportPrinted: 11120/2018
_perations Summary (with Timelog ..pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SWUM
Eq rens
DW(M
MUG
op code
AC&4Cade
rico P -T -x
operation
StMDepol
(IOa3)
ErW DWM(WJ3)
11/1/2018
11/1/2018
0.10
COMPZI
CASING
RUNL
P
Correct to the EOP flag minus 11.0',
7,296.1
7,296.1
01:53
01:59
PUW
11/1/2018
11/1/2018
0.30
COMPZ1
CASING
RUNL
P
Continue RIH
7,296.1
8,166.0
01:59
02:17
11/1/2018
11/1/2018
1.75
COMPZI
CASING
RUNL
P
Start working liner towardsboltom,
8,166.0
9,960.0
02:17
04:02
PUW's 4550k
11/1/2018
11/1/2018
0.20
COMPZI
CASING
RUNL
P
Continue RIH to bottom
9,960.0
10,347.0
04:02
04:14
11/1/2018
11/1/2018
2.00
COMPZI
CASING
TRIP
P
Off bottom, PUW 34 k, remove liner
10,347.0
58.0
04:14
06:14
length from depth, lined up across the
top, POOH
11/1/2018
11!1/2018
0.60
COMPZI
CASING
PULD
P
Crew change, PJSM, bump up, flow
58.0
0.0
06:14
06:50
check, LD BHA#8, IowefAL1
completion running assembly.
11/1/2018
11/1/2018
0.40
COMPZ1
CASING
PUTB
P
Prep floor to run liner
58.0
0.0
06:50
07:14
11/1/2018
11/1/2018
0.50
COMPZI
CASING
SVRG
P
Lock out comy to repair hydralic weep
0.0
0.0
07:14
07:44
on HCR - B8, (recently replaced)
11/1/2018
11/1/2018
1.20
COMPZI
CASING
PUTB
P
Pickup and run 19joints under an
0.0
763.7
07:44
08:56
anchored billet. (763.69' LOA)
11/1/2018
11/1/2018
0.90
COMPZI
CASING
PUTB
P
PU BHA# 9,Upper completion
763.7
837.1
08:56
09:50
running assembly.
11/1/2018
11/1/2018
1.60
COMPZI
CASING
RUNL
P
RIH, Tie.into the windowflag fora -8.9'
837.1
8,062.0
09:50
11:26
correction, Close EDC. PU Wt 351k lbs
@ 7226'
Encounter sharp WOB increase as
bull nose approached the billet @
7745'.
Stack 10 k WOB @ 7877', slow
running speed from 26 ft/min to 17
lt/min
Stack 10.9 k WOB again at 8,062 bit
depth, PU Wt 37 k lbs
11/1/2018
11/1/2018
1.60
COMPZI
CASING
PULL
T
PUH, park, open EDC, POOH, update
8,062.0
844.0
11:26
13:02
window flag depth to account for
planed BHA change.
11/1/2018
11/1/2018
0.80
COMPZI
CASING
PULD
T
Bump up, flow check, 0.4 bbls to fill
844.0
809.1
13:02
13:50
stack, LD liner running tools.
11/1/2018
11/1/2018
0.90
COMPZI
CASING
PULD
T
MU BHA #10, (drop off HOT, pick up
809.1
809.1
13:50.
14:44
GS and make up shorty to liner)
11/1/2018
17/1/2018
1.80
COMPZI
CASING
RUNL
T
Bump up, set counters, RIH,
809.1
8,506.7
14:44
16:32
PU Wt 35 k lbs @ 7209', WOB -3 on
pick up.
RIH widow, billet clean, S/D 8506'
PU Wt 36 k lbs, RBIH, SID 8506.6'&
4.2 k WOB
Pump 1.5 bpm, only built 104 psi diff,
S/D , discuss, pump 1.7 bpm, max
safe for BHP, built 3576 psi on CT and
127 psi diff
11/1/2018
11/1/2018
2.00
COMPZI
CASING
TRIP
T
PU, WOB -2.2klbs POOH with ALI
8,506.7
809.1
16:32
18:32
upper completion. Suspect EDC has
failed.
Park at 6864', cycle EDC open then
closed,
11/1/2018
11/1/2018
0.45
COMPZI
CASING
PULD
T
At surface, check well for flow, unstab
809.1
764.9
18:32
18:59
INJH, MU test plate to end of coil, PT
4,100 psi (good -test), move cart back,
continue inspecting CDiltrak Tools,
found
EDC failure, PJSM for
contengencies while swapping out
tools,
11/1018
11/1/2018
0.50
COMPZI
CASING
PULD
T
Swap out upper section,
764.9
764.9
18:59
9
19:29
Page 13139 Report Printed: 11120120181
_ aerations Summary (with TimelOg L pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SWTMS
rsa Toe
av(n4
ros=e
opOoae
naway cafe
rarer -r -x
opar, em
SWI Depth
(wok
EnaDepth PSI
11/1/2018
1111/2018
0.25
COMPZI
CASING
PULD
T
Move cart forward, MU Coil, perform
764.9
809.1
1929
19:44
1 surface test (good -test)
11/1/2018
11/1/2018
0.10
COMPZ1
CASING
PULD
T
Stab on INJH, tag up reset counters,
809.1
809.1
19:44
19:50
-1
RIH w1BHA#11
11/1/2018
11/1/2o18
o0
COMPZI
CASING
RUNL
T
RIH, w/19 Its of slotted liner, ported
809.1
7,222.0
19:50
20:50
bullnose, and shorty deployment
sleeve, BHA#11 linersegment#2
11/1/2018
11/1/2018
0.15
COMPZI
CASING
RUNL
T
Correct to the EOP flag plus 16.0',
7,222.0
7,222.0
20:50
20:59
1
PUW 35 k, minus 4.4 k DHWOB
11/1/2018
11/112018
0.20
COMPZI
CASING
RUNL
T
Continue IH
7,222.0
7,830.0
20:59
21:11
11/1/2018
1111/2018
0.40
COMPZ1
CASING
RUNL
T
Log the Ki for depth control, minus
7,830.0
7,830.0
21:11
21:35
25' (minus 9.0')
11/1/2018
11/1/2018
0.25
COMPZI
CASING
RUNL
T
Continue RIH
7,830.0
8,506.0
21:35
21:50
11/1/2018
11/1/2018
0.15
COMPZ1
CASING
RUNL
P
Set down, 2.3 k, PUW 37 k, set back
8,506.0
7,730.0
21:50
21:59
down, 3.5 k, bring pump up to 1.4 bpm
at 3,953 psi, 1,099 psi diff, PUW 32 k
minus 2.2 DH WOB, liner released,
park at remove liner length from
counter depths
11/1/2018
11/1/2018
1.50
COMPZI
CASING
TRIP
P
POOH, pumping min rate down the
7,730.0
44.2
21:59
23:29
coil, PJSM Q 2,500'
11/1/2018
11/2/2018
0.51
COMPZ1
CASING
PULD
P
At surface, check well for flow, LD
44.2
0.0
23:29
00:00
setting tools BHA#10
11/2/2018
11/212018
0.75
COMPZI
CASING
PULD
P
PU/MU OH Anchored Billet, MU
0.0
73.4
00:00
00:45
ColliTrak tools, MU UQC, surface test
tools (good -test), stab and MU INJH,
tag up, reset counter depths
11/212018
11/2/2018
1.20
COMPZI
CASING
TRIP
P
RIH, with OH Anchored Billet (open-
73.4
7,095.0
00:45
01:57
EDC), pumping min rate 0.35 bpm at
356 psi
11/2/2018
111212018
0.30
COMPZI
CASING
DLOG.
P
Log the K1 marker correction of minus
7,095.0
7,121.0
01:57
02:15
7.5', close EDC, PUW 35 k
11/2/2018
11/212018
0.20
COMPZI
CASING
TRIP
P
Continue IH
7,121.0
7,741.0
02:15
02:27
11/2/2018
1112/2018
0.20
COMPZI
CASING
WPST
P
Set down 2.2 k DHWOB, PUH to
7,741.0
7,730.0
02:27
02:39
neutral weight, bring pump up at 0.5
bpm up to shear 2,600 psi, PUW 38 k
11/2/2018
11/2/2018
1.50
COMPZ1
CASING
TRIP
P
POOH, pumping 0.72 bpm at 1,127
7,730.0
44.2
02:39
04:09
psi, PJSM Q 500' from surface
11/2/2018
11/2/2018
0.50
COMPZI
CASING
PULD
P
At surface, LD setting tools on a dead
44.2
0.0
04:09
04:39
1
well.
11/2/2018
11/2/2018
1.00
PROD2
STK
PULD
P
PU BHA# 13, AL1 -01 drilling
0.0
78.2
04:39
05:39
assembly, 0.7" AKO w HYC A2 bit,
bump up, set counters.
11/212018
1112/2018
1.00
PROD2
STK
TRIP
P
RIH,
78.2
7,091.0
05:39
06:39
11/2/2018
11/212018
0.20
PROD2
STK
DLOG
P
Tie into the K1 marker for -8'
7,091.0
7,122.0
06:39
06:51
correction
11/2/2018
1112/2018
1.40
PROD2
STK
DISP
P
Continue to RIH
7,122.0
7,730.0
06:51
08:15
Tag TOB @ 7730.4', PUH while
displacing drilling mud to surface.
11/212018
1112/2018
1.50
PROD2
STK
KOST
P
Time mill off billet
7,730.0
7,732.2
08:15
09:45
CT 4305 psi @ 1.80 bpm in 1.80 bpm
out, free pinn 1075 psi, CT WT 16.7 k
lbs, WOB 0.4 k lbs
WH 275 psi IA 694 psi, OA 719 psi.
11/2/2018
11/212018
0.60
PROD2
STK
KOST
P
Start targeting 0.5 k WOB, step up to
7,732.2
7,740.8
09:45
10:21 1
I
5, 10 and 15 ft,hr
Page 14/39 ReportPrinted: 11/20/2018
Summary (with Timelog , pths)
3H -13A
lipperations
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SWTme
End now
or(hr)
pta
Op Code
ACMyCale
Time P -T -X
OpereHon
Stell OEpT
(Mra)
End Depth (MB)
11/2/2018
11/2/2018
0.80
PROD2
DRILL
DRLG
P
Drilling ahead
7,740.8
7,792.0
10:21
11:09
Ct Wt 13 k Ibs, WOB 2 k lbs, ROP 100
11/hr
Drill to 7790', PU Wt 41 k bs, PUH,
slight over pull at bilet, 0.8 k lbs WOB
RBIH, dirty drift, billet clean
11/2/2018
11/2/2018
0.80
PROD2
DRILL
DRLG
P
OBD
7,792.0
7,891.0
11:09
11:57
CT Wt 13.6 k Ibs, WOB1.6 k Ibs, ROP
200 ftlhr
11/2/2018
11/212018
0.40
PROD2
DRILL
WPRT
P
PU for DD wipers, dirty surveys and
7,891.0
7,891.0
11:57
12:21
threading the needle betwen AL1,
P81.
Disscussed w town, PUH and shot
checkshot above billet.
RBIH
11/2/2018
11/2/2018
1.00
PROD2
DRILL
DRLG
15
CT 4451 psi, @ 1.81 bpm in, 1.80
7,891.0
8,046.0
12:21
13:21
bpm out, free spin diff 1205 psi,
annular 3731 psi.
CT 12.8 k Ibs, WOB 2.1 k Ibs, ROP
200 f/hr
Average ROP over interval 155
11/2/2018
11/2/2018
0.80
PROD2
DRILL
DRLG
P
Having dificully getting turned down
8,046.0
8,074.0
13:21
14:09
PU 44 k lbs, RBIH slowliy
PU 39k lbs, RBIH slowly
Time drill
11/2/2018
11/2/2018
1.70
PROD2
DRILL
DRLG
P
PU Wt 38 k lbs, adjust rate back to 1.8
8,074.0
8,300.0
14:09
15:51
CT 4435 psi, 1.79 bpm in, 1.79 bpm
out, free spin 1181 psi, annular 3747
psi, WH 188 psi, IA 697, OA 760
CT 8.4 k lbs, WOB 2.4 k lbs, ROP 200
Mr.
11/2/2018
11/2/2018
0.20
PROD2
DRILL
WPRT
P
PU, 41 k Ibs -1 MOB coming off
8,300.0
7,764.0
15:51
16:03
bottom
slight negWOB overpulls (ria 7928, and
7780'
11/2/2018
11/2/2018
0.20
PROD2
DRILL
WPRT
P
RBIH
7,764.0
8,300.0
16:03
16:15
S/D @ 7764' and 7776'
reduce pump rate and RIH
11/2/2018
11/2/2018
1.20
PROD2
DRILL
DRLG
P
CT 4435 psi, 1.79 bpm in, 1.79 bpm
8,300.0
8,529.0
16:15
17:27
out, free spin 1193 psi, annular 3747
psi, WH 180 psi, IA 699, OA 780
CT 8.4 k lbs, WOB 2.4 k lbs, ROP 200
ft(hr.
PU Wt 37 k lbs, adjust rale to 1.9
CT 4704 psi, 1.90 bpm in, 1.90 bpm
out, free spin 1298 psi, annular 3732
psi, WH 150 psi
CT 8.6 k lbs, WOB 2.2 k Ibs, ROP 200
Whir.
11/2/2016
11/2/2018
1.60
PROD2
DRILL
DRLG
P
OBD @ 228 fph, 1.9 bpm at 5,206 psi,
8,529.0
8,700.0
17:27
19:03
Diff --1,315 psi, WHP=36, BHP=3,605,
IA=701, OA=800
11/2/2018
11/2/2018
0.50
PROD2
TRILL
WPRT
P
wiper up hole with sweeps, PUW 35 k
8,700.0
7,760.0
19:03
19:33
11/2/2018
11/2!2018
0.45
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW 16 k
7,760.0
8,700.0
19:33
20:00
11/2/2018
11/2/2018
2.30
PROD2
DRILL
DRLG
P
BOBD, 1.9 bpm at 3,796 psi,
8,700.0
9,101.0
20:00
22:18
Diff --1,325 psi, WHP=166,
BHP=3,809, IA=702, OA=806
11/2/2018
11/22018
1.10
PROD2
DRILL
WPRT
P
Wiper up hole, PUW 39 k
9,101.0
7,360.0
22:18
23:24
11/2/2018
11/22018
0.20
PROM
DRILL
DLOG
P
Log RA marker correction of plus 2.0'
7,360.0
7,362.0
23:24
23:36
Page 15/39 ReportPrinted: 11/20/2018
Aerations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stall Time
EndTM
Dur(hr)
Phase
Cp Code
Ac" Code
Tore P -T -X
Operation
Start Depth
(WB)
End DepM OW)
11/2/2018
11/3/2018
0.40
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW 10 k
7,362.0
8,823.0
23:36
00:00
11/3/2018
11/3/2018
0.15
PROD2
DRILL
WPRT
P
Continue wiper in hole, RIW 10 k
8,823.0
9,101.0
00:00
00:09
11/3/2018
11/3/2018
1.00
PROD2
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,977 psi,
9,101.0
9,241.0
00:09
01:09
Diff -1,360 psi, WHP=164,
BHP=3,820, IA=700, OA=811
11/3/2018
11/3/2018
0.10
PROD2
DRILL
WPRT
P
BHA Wiper PUW 45 k
9,241.0
9,241.0
01:09
01:15
11/3/2018
11/3/2018
1.75
PROD2
DRILL
DRLG
P
BOBD, 1.9 bpm at 5,109 psi,
9,241.0
9,455.0
01:15
03:00
Diff -1.367 psi, WHP=227,
BHP=3,849, IA=701, OA=819
Note: New Mud at the bit 9,394'
11/3/2018
11/3/2018
0.34
PROD2
DRILL
DRLG
P
PUH, obtain drilling parameters,
9,455.0
9,500.0
03:00
03:20
BOBD, 1.9 bpm at 4,698 psi,
Diff -1,349, WHP=340, BHP=3,830,
IA=696, OA=804
11/3/2018
11/3/2018
0.45
PROD2
DRILL
WPRT
P
Wiper up hole 1000', PUW 39 k
9,500.0
8,500.0
03:20
03:47
11/3/2018
11/3/2018
0.40
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW
8,500.0
9,500.6-
03:47
04:11
11/3/2018
11/3/2018
1.90
PROD2
DRILL_
DRLG
P
BOBD, 1.9 bpm at 4,489 psi,
9,500.0
9,773.0
04:11
06:05
Diff --1,130, WHP=387, BHP=3,846,
IA=694, OA=771
Average ROP over interval 143 ft/hr
11/3/2018
11/3/2018
0.45
PROD2
DRILL
WPRT
P
PU wt 42 k, crew change pick up,
9,773.0
9,773.0
06:05
06:32
1 00'wiper, RBIH Wt 8.9 k lbs
11/3/2018
11/3/2018
0.60
PROD2
DRILL
DRLG
P
CT 4650 psi @ 1.88 bpm in, 1.80 bpm
9,773.0
9,900.0
06:32
07:08
out, Free spin diff 1211 psi, Annular
3875 psi, 11.8 ppg @ the window
WH 335 psi, IA 694 psi, OA 755 psi
BOBD, CT Wt 0 k lbs, WOB 1.34 k Ibs,
ROP 100-200 ft/hr
Average ROP over interval ff/hr 211
11/3/2018
11/3/2018
0.40
PROD2
DRILL
WPRT
P
PU Wt 44 kwiper #2
9,900.0
8,896.0
07:08
07:32
11/3/2018
11/3/2018
0.40
PROD2
DRILL
WPRT
P
RBIH Ct Wt
8,896.0
9,900.0
07:32
07:56
11/3/2018
11/3/2018
0.90
PROD2
DRILL
DRLG
P
OBD
9,900.0
10,018.0
07:56
08:50
CT 5025 psi @ 1.88 bpm Free spin diff
1202 psi,
CT Wt -1 k Ibs, WOB 1. k lbs, ROP
100-200 ft/hr
Average ROP over interval ft/hr 131
11/3/2018
11/3/2018
0.40
PROD2
DRILL
DRLG
P
DD having issue building angle, PU
10,018.0
10,068.0
08:50
09:14
and restart with lower pump rate, 1.53
bpm
CT 5025 psi @ 1.88 bpm Free spin diff
1202 psi,
CT Wt -1 k Ibs, WOB 1. k Its, ROP
100-200 ft/hr
Average ROP over interval ft/hr 125
11/3/2018
11/3/2018
0.80
PROD2
DRILL
DRLG
P
Built angle. to 88', PU 40 k lbs,
10,068.0
10,137.0
09:14
10:02
increase rate back to 1.9
CT 4878 psi, @ 1.88 bpm in, 1.86
bpm out, Annular 3898 psi, WH 271
psi, IA 695 psi, OA 776 psi
CT Wt -4.8 k lbs, WOB 1 k Ibs, ROP
150 f imin
PU 10081, 44 k Ibs
Average ROP over interval fUhr 86
Page 16/39 Report Printed: 11/2 012 01 8
• ,aerations Summary (with Timelog . )ths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Shit Thee
End lire
or (M
Phase
op Code
Ac" Code
Time P -T -x
opmetim
start Depth
(MB)
End Depth()
11/32018
11/3/2018
1.70
PROD2
DRILL
DRLG
P
Sudden dop in ROP @ 10137', drilling
10,137.0
10,265.0
10:02
11:44
break @ 10,140'
CT 4878 psi, @ 1.88 bpm in, 1.86
bpm out, Annular 3898 psi, WH 271
psi, 1A 695 psi, OA 776 psi
CT Wt -4.8 k lbs, WOB 1 k lbs, ROP 8
- 150 ft/min
PU's 10081, 44 k lbs
10138 48 k
10169 42 k
10185 43 k
10204 43 k
10230 46 k
10247 46k
Pump 5x5, Average ROP over interval
R/hr 75
11/3/2018
11/3/2018
1.00
PROD2
DRILL
WPRT
P
PU Wt 46 kwiper #3
10,265.0
7,360.0
11:44
12:44
Hole and billet des on trip out of hole,
returned 0.5 bible solids
11/3/2018
11/3/2018
0.10
PROD2
DRILL
DLOG
P
Tie into the RA tag for a +4' correction
7,360.0
7,381.0
12:44
12:50
11/3/2018
11/32018
1.86
PROD2
DRILL
WPRT
P
Wiper back in hole, RIW
7,381.0
10,266.0
12:50
14:38
billet clean,
Stack WOB to 4 k x4, PU's to -2 k lbs
WOB from 8340-8390'
Orient TF to as drilled, pump to min
rate, and lower RIH speed to 30 ft/min,
slid through.
Hole otherwise clean to bottom.
While increasing rate to 1.9 bpm,
experienced 2 annular pressure
events and pulled heavy 48 k lbs ,
packing off.
Launched 5x5 sweep pulled up hole
slowly pumping 1.9 bpm, pressures
back to normal. lower pump rate to 1.7
bpm and attempt to RIH, no luck
11/32018
11/312018
0.40
PROD2
DRILL
WPRT
P
PUH on 500' wiper while adding low
10,266.0
10,266.0
14:38
15:02
torqu to high and low vis pit pits as
well as Alpine beads to Hi Vs
Tum around @ 9776' RBIH
11/3/2018
11/32016
2.96
PROD2
DRILL
DRLG
P
CT 4345 psi, @ 1.70 bpm in, 1.70
10,266.0
10,421.0
15:02
18:00
bpm out, Annular 3913 psi, WH 311
psi, IA IA 698, OA 789
CT Wt -4.9 k lbs, WOB 1.76 k lbs,
PPU @ 10297', 52 k Itis
Pumping sweeps 5x5 w beads in the
hi -vis
11/3/2018
11/32018
4.20
PROM
DRILL
DRLG
P
Continue Drilling ahead with beaded
10,421.0
10,696.0
18:00
22:12
sweeps, 1.9 bpm at 4,420 psi,
Diff --1,152 psi, WHP=244,
BHP=3,938, IA=700, OA=813, PU's
35-45 k
11/3/2018
11/4/2018
1.80
PROD2
DRILL
WPRT
P
TDALl-01 Lateral, PUH 35 k, heistate
10,696.0
7,316.0
22:12
00:00
for sweeps to exit bit, POOH, launch
and time out sweeps @ EOB and
window, continue Wiper to the swab
valve.
11/4/2018
11/4/2018
1.50
PROD2
DRILL
WPRT
P
Continue wiper to the swab valve,
7,316.0
78.3
00:00
01:30
pumping 1.83 bpm at 4,725 psi,
perform jog @ 1,071'- 1,453',
recovered some carvings across
shaker, retrieve sample and upload
picture to s:ddve, continue wiper to
surface
Page 17/39 Report Printed: 1 112 012 01 8
• aerations Summary (with Timelog , aths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Time
End Tire
DIN 00
PM"
op Code
I A-MyCode
Time P -T -X
Operation
stat Depth
(81®)
End D" (WB)
11/4/2018
11/4/2018
0.20
PROD2
DRILL
WPRT
P
Tag up at surface, reset counter
78.3
78.3
01:30
01:42
depths
11/412018
11/4/2018
0.20
PROD2
DRILL
TRIP
P
—Daylight savings—
78.3
7,095.0
01:42
01:54
—o
RIH to confirm TD
11/4/2018
11/4/2018
20
PR552
DRILL
DLOG
P
Log the K1 correction of minus 9.5',
7,095.0
7,316.0
01:54
02:06
PUW
11/4/2018
11/4/2018
0.20
PR5D2
DRILL
CTOP
P
Perform Pressure Survey, Shutdown
7,316.0
7,316.0
02:06
02:18
mud pump, close choke
71' RKB to Sea Lvl
11.6 ppg ECD
3,595 psi
Press Sensor (TVD) 5,947.88-
11/412018
11/4/2018
2.20
PROD2
DRILL
WPRT
T
Continue IH, started taking CT weight
7,316.0
10,420.0
02:18
04:30
@ 8,392'(4k bobble) no pickup,
continued IH, 9,045' set down, noticed
packing off and pulling heavy (52k),
worked pipe, continued back up hole
to 8,000', RBIH, fairly clean toward
bottom, struggling to get back to
bottom @ 10,420', pull wiper to the
window.
11/4/2018
11/4/2018
2.20
PROD2
DRILL
WPRT
T
Pull wiper to the window, PUW 45 k
10,420.0
7,360.0
04:30
06:42
Up down passes @ 10,286, 10135,
10107'
-1 k WOB bobble @ 8348'
11/4/2018
11/4/2018
0.20
PROD2
DRILL
DLOG
T
Tie int oth RA tag for +2' correcion
7,360.0
7,396.0
06:42
06:54
11/4/2018
11/4/2018
1.00
PROD2
DRILL
TRIP
T
RBIH to confirm TD and lay in liner
7,396.0
9,720.0
06:54
07:54
running pill
Encounter motor work in multiple
spots, 8375, 9030, 9451, 9720'
SID multiple times 9720', varied pump
rate, running speed, and TF, PU's 45 k
lbs
fine fresh cavings and lots of fine
cuttings at the shaker, looks like we
are drilling ahead at – 120 filhr
11/4/2018
11/4/2018
1.80
PROD2
DRILL
WPRT
T
Consult w engineering on path
9,720.0
7,280.0
07:54
09:42
forward, Roll into clean out mode,
transfer liner running pill back to pit 6
KW and build 50 bbl's each to and hi
vis, hi vis out of active mud to allow
room for expected returns at surface.
While building sweeps, PUH slowly,
minor pack o8 events @ 9200, 9075,
9891', 8364' and pulled heavy at 8344'
RBIH, 3 k WOB, PU, 35 k lbs, PUH
Billet and window clean.
"'•additional 1.4 bbl's of cuttings
returned since RBIH post swab wiper
11!4/2018
11/4/2018
1.60
PROD2
DRILL
WPRT
T
Pump 5x5, chase to surface while
7,280.0
7,097.0
09:42
11:18
jogging coil from 6559 to 7275'. Some
large rocks and a large amount of fine
cavings returned to the shaker.
Steady state of cavings that had been
returning diminished significantly.
Pumped additional 5x5, greatly
diminished amount of large rocks, only
a couple versus 100's.
11/4/2018
11/4/2018
0.20
PROD2
DRILL
DLOG
T
Tie into the Kt for a+3' correction.
7,097.0
7,112.2
11:18 1130
Page 18139 Report Printed: 11/20/2018
perations Summary (with Timelog . pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SWTM
EWTme
SWM
Pham
Op Code
A .ty Code
Tkne P -T -X
Operation
Slat Depth
QKB)
End Depth OK13)
11/4/2016
11/4/2018
1.40
PROD2
DRILL
WPRT
T
RIH, window and build clean, pumping
7,112.2
10,699.0
11:30
12:54
1 bpm and running 50 ft/min.
Some motor work @ 7776', 9432', and
SID @ 10,290'. PU 40 it lbs.
11/4/2018
11/4/2018
0.30
PROD2
DRILL
WPRT
T
PU, 38 k lbs, Stage pump to 1.9 bpm,
10,699.0
10,630.0
12:64
13:12
POOH slowly at rate chasing sweep
out of open hole.
Three annular pressure spikes with a
sligh drop in out rate 38 bbls pumped.
11/4/2018
11/4/2018
1.00
PROD2
DRILL
WPRT
T
Increase pulling speed to 50 ft/min,
10,630.0
7,863.0
13:12
14:12
POOH
Stage sweeps for build and the
window.
neg WOB over pulls @ 9461' and
8377' with annular pressure spikes.
11/4/2018
11/4/2018
0.80
PROD2
DRILL
WPRT
T
Baker coil trac tools lost power, slow
7,863.0
7,718.0
14:12
15:00
pulling speed to 3 ftfmin.
Sweeps exiting early, Started to pack
off and pull heavy @ 7779'
Attempt to RIH, setting down at 7755'
Pulling up to 50 it @ 7746.
Work pipe, returns fluctuating. Pull
past billet, full returns
11/4/2018
11/4/2018
0.80
PROD2
DRILL
WPRT
T
Pull through build blind. No over pull
7,718.0
7,718.0
15:00
15:48
on CT Wt.
Sweeps from the billet landed with a
few rocks, mostly small cavings.
Pumped 4 sweeps in cased hole, third
and fourth clean.
11/4/2018
11/4/2018
2.75
PROD2
DRILL
WPRT
T
POOH, to surface without comms to
7,718.0
78.2
15:48
18:33
BHA
11/4/2018
11/4/2018
1.00
PROD2
DRILL
PULD
T
Al surface, PUD failed drilling BHA
78.2
0.0
18:33
19:33
#13, unstab INJH, test edine (good -
test), slide cart back, hooked up test
cable to BHA test tools (bad -test),
continue PUD
11/4/2018
11/4/2018
1.15
PROD2
DRILL
PULD
T
PD cleanout _BHA #14
0.0
68.4
19:33
20:42
11/4/2018
11/4/2018
1.25
PROD2
DRILL
TRIP
T
Tag up, reset counters, RIH w/BHA
68.4
7,090.0
20:42
21:57
#14 cleanout assembly with D331 and
agitator.
91/4/2o18
11/4/2018
0.20
PROD2
DRILL
DLOG
T
Log the K1 marker correction of minus
7,090.0
7,124.0
21:57
22:09
1
8.5'
*** Note: End of BHI DT
11/4/2018
11/4/2018
0.45
PROD2
DRILL
TRIP
T
Continue RIH thru window, timeout
7,124.0
7,900.0
22:09
22:36
5x5 sweep,
*— Note: 7,733-7,776' notice +2.2 k
DHWOB
11/4/2018
11/4/2018
1.00
PROD2
DRILL
WPRT
T
Pull wiper up to the tubing, PUW 36 k,
7,900.0
5,500.0
22:36
23:36
notice
*** Note: Minus 6.0 k pull @ 7,730' as
DTF
11/412018
11/5/2018
0.40
PROD2
DRILL
TRIP
T
Continue trip back in hole, RIW 14 k
5,500.0
7,646.0
23:36
00:00
11/5/2018
11/5/2018
0.55
PROD2
DRILL
TRIP
T
Continue trip back in hole Teen, RIW
7,646.0
9,000.0
00:00
00:33
14 k
11/5/2018
11/5/2018
1.00
PROD2
DRILL
WPRT
T
Wiper up hole into the tubing, PUW 38
9,000.0
5,800.0
00:33
01:33
.
k, 7,763' minus 1.0 k, 8,983' minus
2.5 k
Page 19/39 ReportPrinted: 11120120181
an aerations Summary (with Timelog . pths)
3H -13A
..,..
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Cog
Slav Tile
rya TYrc
Oir(ix)
{Tess
OP CoOe
Acivny Cotle
1Ma P -T -x
Cppaim
sun Dgnh
(11103)
End DRIh(fif0)
11/5/2018
11/5/2018
0.25
PROD2
DRILL
TRIP
T
RBIH
5,800.0
7,090.0
01:33
01:48
11/5/2018
11/5/2018
0.10
PROD2
DRILL
DLOG
T
Log the K1 marker correction of plus
7,090.0
7,110.0
01:48
01:54
2.5'
11/5/2018
11/5/2018
1.70
PROD2
DRILL
TRIP
T
Continue trip in hole, RIW 14 k, 7,730'
7,110.0
10,699.0
01:54
03:36
0.9 k, 9,450' 0.3 k, 10,251' 1.0 k,
10,400' 0.6 k, 10,470' setdown, PUH
38 k, RBIH, confirm TD 10,699', pump
1 0x1 0 sweep
11/5/2018
11/5/2018
1.80
PROD2
DRILL
WPRT
T
PUH slowly notice annular pressure
10,699.0
10,465.0
03:36
05:24
swings, slowly work coil up hole,
10,465' pull heavy, turn around and
are unable to move pipe, returns
slowly deminished to zero. Countinue
to work pipe to establish returns.
11/5/2018
11/5/2018
7.10
PROD2
DRILL
CTOP
T
Circulate 14.7 bbl of LVT down coil, let
10,465.0
10,465.0
05:24
12:30
soak, work pipe staging CT Wt up to
86 k lbs, and -16 k lbs. Alempted
various pump rates and dumped
choke while pulling max.
11/5/2018
11/5/2018
3.50
PROD2
DRILL
CTOP
T
Build 10 bbl 100 k LSRV Hi -vis pill,
10,465.0
10,465.0
12:30
16:00
displace down coil to open hole. Let
sit static 1 hr. Open EDC. Stage
pumps to 3 bpm, reduce WH to - 350
psi, no circulation. Diconnect from
BHA, pump up to 2 bpm, cyle pipe
to 80 k - 15 k lbs. no movement CT
depth 10461.6 to 10444.8"
11/5/2018
11/5/2018
2.00
PROD2
DRILL
CTOP
T
Trapped WH of 660 psi, slowly falling,
10,465.0
10,465.0
16:00
18:00
11/5/2018
11/5/2018
1.40
PROD2
DRILL
CTOP
T
Make up and confirm kill fluid is up to
10,465.0
10,465.0
18:00
19:24
weight 11.8 ppg, with added lubes 42
bbl, confirm 100 bbls of kill fluid
without
11/5/2018
11/5/2018
0.65
PROD2
DRILL
CTOP
T
Work pipe, unsuccessful
10,465.0
10,465.0
19:24
20:03
11/5/2018
11/5/2018
1.00
PROD2
DRILL
CTOP
T
Pump kill 11.8 ppg kill fluid down back
10,465.0
10,465.0
20:03
21:03
side. 1,800slow/ si
p y dropping to 992
psi (65 bbis)
11/5/2018
11/5/2018
1.50
PROD2
DRILL
CTOP
T
Pump additional 5 bbis while working
10,465.0
10,465.0
21:03
22:33
pipe -10k -+95k
11/5/2018
11/5/2018
0.50
PR552
DRILL
CTOP
T
Circulate 11.8 ppg tubed kill weight
10,465.0
10,465.0
22:33
23:03
fluid down the coil Q 1.5 bpm
11/5/2018
11/5/2018
0.75
PROD2
DRILL
CTOP
T
Mondor well for Now, work pipe twice
10,465.0
10,465.0
23:03
23:48
with no success.
11/5/2018
11/6/2018
0.20
PROD2
DRILL
CTOP
T
Open 1x2 on pump in sub on RF,
10,465.0
10,465.0
23:48
00:00
monitor well for flow.
11/6/2018
11/6/2018
1.00
PROD2
DRILL
CTOP
T
Fill hole, loss rate 1.2 bbis every hour.
10,465.0
10,465.0
00:00
01:00
SLB on location with hot -tap, run hand
thm rig orientation. PJSM
11/6/2016
11/6/2018
0.40
PROD2
DRILL
CTOP
T
PJSM with dg crew on pipe recovery,
10,465.0
10,465.0
01:00
01:24
no flow at surface
11/6/2018
11/6/2018
0.25
PROD2
DRILL
CTOP
T
41 k, (no flow) function closed Upper
10,465.0
10,465.0
01:24
01:39
and Lower 2 inch rams, manually lock
rams.
11/6/2018
11/6/2018
0.50
PROD2
DRILL
CTOP
T
line up and blow down riser to the pit
10,465.0
10,465.0
01:39
02:09
11/6/2018
11/6/2018
0.50
PROD2
DRILL
CTOP
T
Install pipe slips, dog collar, and dog
10,465.0
10,465.0
02:09
02:39
collar, secure coil at stump
11/6/2018
11/6/2018
1.40
PROD2
DRILL
CTOP
T
PJSM, (no -flow), install hot -tap, drill
10,465.0
10,465.0
02:39
04:03
hole into coil, monitor flow inside coil,
fluiid appears to be high -vis
Page 20139 ReportPrinted: 11/20/2018
Summary (with Timelog . pths)
3H -13A
lipAerations
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
swtarre
End Tire
draa)
Phase
op Cone
AcWftyCode
rmreP-T.xCpemtlan
SW Depen
(N®)
End oepM(N®)
11/6/2018
11/6/2018
1.50
PROD2
DRILL
CTOP
T
Remove hot -tap, cut coil above 87"
10,465.0
10,465.0
04:03
05:33
from rig floor, install e -line clamp. trim
coil to obtain 20' of slack e -line.
11/6/2018
11/6/2018
0.50
PROD2
DRILL
CTOP
T
Install coil clamp, clean and organize
10,465.0
10,465.0
05:33
06:03
RF for changeout
11/6/2018
11/6/2018
6.40
PROD2
DRILL
CTOP
T
Complete change out, discuss path
10,465.0
10,465.0
06:03
12:27
forward, lockout and cut wire at
injector, install T bar, take control of
wire at stump, Pull tension, remove
lower wire clamp, cut additional tubing
to allow space for roll bar to clear
while skidding cart.
"' note 80" max coil length to clear
lower wire grab.
Reattach lower wire clamp, skid cart
and start installing spoolable
connector on injector side of pipe.
Install Tiber clamp to wire, RON (30
ton strain gauge) n tugger limited to 5k
lbs.
Pull tension on e -line, working up in
300 Ib increments up to 2700 lbs on
the RON, confer with town engineer to
pull over working limit of cable (2700
lbs), and cable releases at 2950 lbs
after-20o'slack pulled from coil.
Hanging weight of cable after release
= 1000 lbs indicating that the cable
released at the anchor.
"147.3' of slack pulled"`
*'Loss rate = 1 bbl/hr"
11/6/2018
11/612018
1.00
PROD2
DRILL
CTOP
T
SLB e -line on location, discuss plan
10,465.0
10,465.0
1227
1327
forward, conduct rig orientation and
PJSM
11/6/2018
1116/2018
1.50
PROD2
DRILL
CTOP
T
Spot e -line unit outside rig and R/U
10,465.0
10,465.0
13:27
14:57
equipment to spool CDR3's e -line onto
SLB's empty drum
11/612018
11/6/2018
1.75
PROD2
DRILL
CTOP
T
Begin pulling e-Ime cable out of hole,
10,465.0
10,465.0
14:57
16:42
slow down and pull by hand -500 ft
from surface
11/6/2018
11/6/2018
1.00
PROD2
DRILL
CTOP
T
E -line and anchor out of hole, R/D e-
10,465.0
10,465.0
16:42
17:42
line, top off inside of coil with KWF,
R/U scaffold
11/6/2018
11/6/2018
0.50
PROD2
DRILL
CTOP
T
Fill coil w/11.8 ppg KWF
10,465.0
10,465.0
17:42
18:12
11/6/2018
11/6/2018
0.50
PROD2
DRILL
CTOP
T
PJSM, with rig and SLB craws
10,465.0
10,465.0
18:12
18:42
11/6/2018
11/6/2018
0.40
PROD2
DRILL
CTOP
T
Spot SLB e -line unit and whale next to
10,465.0
10,465.0
18:42
19:06
rig while installing BOT 5 -pitch CTC
and pull test 25 k
11/6/2018
11/6/2018
3.00
PROD2
DRILL
CTOP
T
RU B-line,
10,465.0
10,465.0
19:06
22:06
11/6/2018
11/612018
1.00
PROM
DRILL
CTOP
T
SLB aline heading up firing head.
10,465.0
10,465.0
22:06
23:06
11/6/2018
11/6/2018
0.40
PROD2
DRILL
CTOP
T
Bring up tools from ground and space
10,465.0
10,465.0
23:06
23:30
out fast line sheave in mast.
11/6/2018
11/6/2018
0.30
PROD2
DRILL
CTOP
T
PU/MU SLB drift (weight bar)
10,465.0
10,465.0
23:30
23:48
11/6/2018
11/7/2018
0.20
PROM
DRILL
CTOP
T
RIH, pumping 1.0 bpm @ 1,524 psi
10,465.0
10,465.0
23:48
00:00
250', POCH
11/7/2018
1117/2018
2.00
PROD2
DRILL
CTOP
T
PJSM, notify Caelus, COP Security,
10,485.0
10,465.0
00:00
02:00
and DSO radio silence
11/7/2018
11/7/2018
1.00
PROD2
DRILL
CTOP
T
RIH, pumping 1.0 bpm tripping 150
10,465.0
10,465.0
02:00
03:00
fpm
towards bottom 8,050'
Page 21139 Report Printed: 1 112 0/2 01 8
,Jerations Summary (with Timelog . aths)
3H-13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Star Time
6p Tine
phase
OPCode
Activi(y Cada
Time P-T-X
Operation
start Depth
(110)
Bid Depth (WB)
11/7/2018
1117/2018
1.2
1.20
PROD2
DRILL
CTOP
T
Pull up hole 7,980', SL PUW 946 k,
10,465.0
10,465.0
03:00
04:12
hesitate for fluid movement, Bre cutter,
indication at surface of full function.
RIH to 8,046', POOH
11/7/2018
11/7/2018
0.40
PROD2
DRILL
CTOP
T
PJSM, LD cutter
10,465.0
10,465.0
04:12
04:36
11/7/2018
11!7/2018
3.50
PR0D2
DRILL
CTOP
T
RD, pump in sub, 2x2, and 90 's,
10,465.0
10,465.0
04:36
08:06
install lifting sub onto 5 pitch CTC,
lower traveling blocks, latch up
11!7/2018
11/7/2018
1.25
PROD2
DRILL
CTOP
T
PJSM before pulling on tubing, PU to
10,465.0
10,465.0
08:06
09:21
42K string weight, open up lower pipe
rams, open up bleeder valves to
confirm zero pressure underneath
upper pipe rams, open upper pipe
rams and remove slips and dog collar,
begin pulling tension on coil, 4 cycles
at 60K, 3 cycles at 65K, 3 cycles at
70K, 3 cycles at 75K (60K on CTC
due to weight of elevators), pipe still
not free. Discuss with town engineer
plan forward.
11/7/2018
11/7/2018
2.00
PROD2
DRILL
CTOP
T
Decision made to pump down coil to
10,465.0
10,465.0
09:21
11:21
determine If there is circulation
through the cut, bring string weight
down to 41.5K, shut upper 2" pipe
rams, set slips and dog collar, install
XO from Baker lifting sub (2-3/8 8rd
ELIE to 1502), 2x2 valve. Valves too
high to operate from scaffolding so
decision made to take Baker lifting sub
out of the rig-up to put valves at a safe
working height.
11/7/2018
1117/2018
0.50
PROD2
DRILL
CTOP
T
Line up to pump down coil taking
10,465.0
10,465.0
11:21
11:51
returns through the drilling choke.
Pump 3 bbls at 0.3bpm/650psi, no
returns, increase pump rate to 1
bpm/1300 psi and pump an additional
2 bbls for a total of 5 Wit 11.8 KW F,
no returns seen at surface
11/7/2018
11/7/2018
0.50
PROD2
DRILL
CTOP
T
Prep rig floor for rigging up SLB a-line,
10,465.0
10,465.0
11:51
12:21
wait on a-line to show up on location
after madatory 8 hour rest period.
11/7/2018
11/7/2018
0.75
PROD
DRILL
CTOP
T
Call for scaffold crew to move
10,465.0
10,465.0
12:21
13:06
scaffolding up T due to pipe stretch
from pulling tension on coil
1117/2018
11/7/2018
1.40
PROD2
DRILL
CTOP
T
Make decision to work pipe some
10,465.0
10,465.0
13:06
14:30
more, build scaffold up 3', dg up baker
ifting sub
11/7/2018
11/7/2018
1.00
PROD2
DRILL
CTOP
T
Measure rig floor to bottom of CTC -
10,465.0
10,465.0
14:30
15:30
91" rior to working ( ) p' g pipe, latch up to
liftig sub, open upper pipe rams, pull
'
slips and dog collar, work pipe 7
cycles between 75K and 25K, bring
string weight back to 41.5K and
measure distance to CTC (72"),
indicating that we are still stuck.
11/7/2018
11/7/2018
1.20
PROD2
DRILL
CTOP
T
Prep dg floor for a-line operations
10,465.0
10,465.0
0
16:42
2018
11/7/2018
1.50
PROD2
DRILL
CTOP
T
PJSM, call for radio silence, RU and
10,465.0
10,465.0
L16:42
18:12
a" cutter,
2018
1117/2018
2.00
PROD2
DRILL
CTOP
T
Bring cutter to the floor and MU quick
104650
10,465.0
2
2012
union
Page 22139 ReportPrinted: 1112012018
. perations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Slat Time
End line
a+(nh
phase
Cp Cafe
Activity Cafe
Time P -T-%
pperapq,
sten Depth
(}pig)
End perry(RKa)
11/7/2018
11/7/2018U.15
PROD2
DRILL
CTOP
T
RIH, come on line with pump 0.6 bpm
10,465.0
10,465.0
20:12
20:57
B 1,209 psi, 1.0 bpm @ 1600 psi, 5
bbl away, noticed pressure spike to
trip at 2,100 psi, shut down pump,
check surface lines and line up,
surface lines seems to be free,
calculate vol from first cut depth
(severing head) to top of Nabors CTC,
6.25 bbl, may be the 4" part of the
severing head wedged into the BHI
upper quick float valves.
11/7/2018
11/8/2018
3.05
PROD2
DRILL
CTOP
T
Continue RIH 100 fpm down to 7,3351,
10,465.0
10,465.0
20:57
00:00
PUH and work wire down hole,
pressure up in increments 1,000 psV
bleed, 2,000 psi/bleed, 3,000
psi/bleed, and 4,000' psi/bleed,
midnight depth 7,357'-
111812018
11/8/2018
1.75
PROD2
DRILL
CTOP
T
Continue to work aline down hole,
10,465.0
10,465.0
00:00
01:45
pressure up and bleed off, working in
stages 1,000 psi, 2,000 psi, 3,000 psi,
4,000 psi, unable to move down hole
further, phone town team, decision
was made to perfrom cut @ 7,357'
1118/2018
11/8/2018
2.00
PROD2
DRILL
CTOP
T
After cut, unable to move up or down
10,465.0
10,465.0
01:45
03:45
hole with a -line, bring pump up 0.59
bpm at 549 psi returns to surface,
worked eline, still unable to move up
or down, increase pump rate up to 1.7
bpm at 1,130 psi, pulled eline tools
free, continue POOH
11/82018
11/8/2018
1.25
PROD2
DRILL
CTOP
T
At 209, call for radio silence, PJSM,
10,465.0
10,465.0
03:45
05:00
LD SLB cutter, RD equipment from cut
end of coil
11/8/2018
1118/2018
1.00
PROD2
DRILL
CTOP
T
Bring blocks down and attach to lifting
10,465.0
10,465.0
05:00
06:00
sub
11/82018
11/8/2018
1.00
PROD2
DRILL
CTOP
T
Latch onto lifting sub, open pipe rams,
10,465.0
7,357.0
06:00
07:00
remove slips and dog collar, PU -20'
at 37K holding steady, appear to have
a goad cut, set back down to original
depth and set pipe rams, slips, and
dog collars
11/8/2018
11/8/2018
3.50
PROD2
DRILL
CTOP
T
Release SLB a -line, RD equipment
7,357.0
7,357.0
07:00
10:30
from cut end of coil, trim coil and dress
stump end for spoolable CTC, make
up to spoolable connector on injector
and downhole side of coil
11/8/2018
1118/2018
0.50
PROD2
DRILL
CTOP
T
Stab on with injector, test packoffs,
7,357.0
7,357.0
10:30
-f -1/8/2018
11:00
1
pull test connector to 25K
11/8/2018
1.00
PROD2
DRILL
CTOP
T
POOH slowly 1.5 fpm 30K watch for
7,357.0
7,000.0
11:00
12:00
spoolable connector coming through
injector, over horses head, and get 3
wraps on reel with connector
11/8/2018
1118/2018
2.35
PROD2
DRILL
CTOP
T
Continue POOH slowly at 80 fpm,
7,000.0
500.0
12:00
14:21
pumping across the top to keep hole
full
11/8/2018
11/8/2018
0.65
PROD2
DRILL
CTOP
T
Flow check, confirm well is dead
500.0
500.0
14:21
15:00
11/8/2018
11/82018
0.90
PROD2
DRILL
CTOP
T
Break riser, POOH at 20 fpm until cut
500.0
0.0
15:00
15:54
is seen at surface, cut looks good
11/8/2018
11/8/2018
0.50
PROD2
DRILL
CTOP
T
Stab back on with injector, conduct
0.0
0.0
15:54
16:24
PJSM with HAL N2 for reel blowdown,
come online with Nitrogen at 1500
scf/min for 8 minutes (11000 scf N2
total),
observed 15 bbls of KWF
returns
to the Tiger Tank
Page 23139 ReportPrinted: 11120/2018
-perations Summary (with TimelOg L aths)
3H -13A
0
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log'
5tadrM12018
FiMriro
dr�q
Melee
Op Coda
A ily Code
Tyne RT -X
oro�n
Start Depth
(ftKe)
�d Depth M(B)11/8/2018
11/812018
1.50
PROM
DRILL
CTOP
T
Bleed down N2 from coil and surface
0.0
0.0
16:24
17:54
fines, RD Hal. N2, unstab INJH,
install clamp onto free end of coil, skid
Icartback
11/8/2018
11/8/2018
0.50
PROD2
DRILL
CTOP
T
Cleanup and organize RF
0.0
0.0
17:54
18:24
11/8/2016
11/8/2018
1.20
PROD2
DRILL
CTOP
P
Grease all equipment and fluid pack
0.0
0.0
18:24
19:36
1
all lines. Prep RF for testing
11/8/2018
11/812018
1.00
PROD2
DRILL
CTOP
P
Obtain shell test, swab leaking by
0.0
0.0
19:36
20:36
phone out Valve crew, service
wellhead valves.
11/8/2018
11/912018
3.40
PROD2
DRILL
BOPE
P
Start BOP test, witness waived by
0.0
0,0
20:36
00:00
Guy Cook, November 08, 2018 @
15:14 pm, 250 psi low/4,800 psi
High/2,500 psi Annular, Test #8
midnight
*** Sim -ops: Dress and install graple
into free end of coil, remove and pin
out counters
11/9/2018
11/9/2018
3.00
PROD2
DRILL
BOPE
P
Continue BOP test, Witness waived by
0.0
0.0
00:00
03:00
Guy Cook, November 08, 2018 @
15:14 pm, 250 psi low/4,800 psi
High/2,500 psi Annular, Test #8 - 14
*** Sim -ops: remove inner reel iron
11/912018
11/9/2018
0.50
PROD2
DRILL
BOPE
P
Test #14-15, perform drawdown test
0.0
0.0
03:00
03:30
(7.0 hr test)
11/9/2018
11/9/2018
4.00
PROD2
DRILL
CTOP
T
Continue Reel Swap, remove
0.0
0.0
03:30
07:30
counters, rig down inner reel Iron and
bulkhead, install grapple
11/9/2018
11/9/2018
2.50
PROD2
DRILL
CTOP
T
Pull test grapple, PJSM for
0.0
0.0
07:30
10:00
unstabbing, unstab coil tubing
11/9/2018
11/9/2018
1.25
PROD2
DRILL
CTOP
T
Position reel, RU shackles and slings,
0.0
0.0
10:00
11:15
remove saddle clamps, open back
doors
11/9/2018
11/9/2018
1.00
PRM
DRILL
CTOP
T
Load old reel onto Peak truck, pick up
0.0
0.0
11:15
12:15
reel #52348 and load onto rig
11/9/2018
11/9/2018
5.75
PROD2
DRILL
CTOP
T
position and secure new reel, install
0.0
0.0
12:15
18:00
new stripper brass, install inner reel
iron, makeup and pull test grapple
11/9/2018
11/9/2018
2.50
PROD2
DRILL
CTOP
T
Crew Change, PJSM, install new
0.0
0.0
18:00
20:30
stripper and secure to INJH, inspect,
adjust, and secure inner reel iron
11/9/2018
11/9/2018
1.50
PROM
DRILL
CTOP
T
Install and pull test grapple, re -tighten
0.0
0.0
20:30
22:00
grapple, remove all banding and
shipping material from reel
11/9/2018
11/9/2018
1.25
PROD2
DRILL
CTOP
T
PJSM, stab coiled tubing into INJH
0.0
0.0
22:00
23:15
11/9/2018
11/10/2018
0.75
PROD2
DRILL
CTOP
T
Prep free end of coiled tubing for CTC
0.0
0.0
23:15
00:00
installation
Sim -ops: PJSM, blow air thru CSL,
RU little red services to CSL,
11/10/2018
11/10/2018
0.80
PROD2
DRILL
CTOP
T
Continue MU new coiled tubing
0.0
0.0
00:00
00:48
_
reel.load 5 bbl of meothonal into reel,
dress free end of coiled tubing for
CTC, pull test 35 k (good -test)
11/10/2018
11/10/2016
1.00 1
PROD2
DRILL
CTOP
T
Head up BHI upper quick connect,
0.0
0.0
00:48
01:48
(good -test), >2000/65. install nozzle
11/1012018
11/10/2018
2.00
PROD2
DRILL
CTOP
T
Slide cart forward, stab onto stump,
0.0
0.0
01:48
03:48
follow meothanol with fresh water,
taking
returns to kill tank.
Page 24/39 ReportPrinted: 111120120181
perations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Sbrl Tme
End Tme
Dwihr)
Phase
Op CoOe
AdNiry Cotle
Time P -T -X
DpwaUan
Stat Depth
000)
End DepthdlW
11/10/2018
11/10/2018
1.20
PROD2
DRILL
CTOP
T
Line up to test inner reel valve and
0.0
0.0
03:48
05:00
pac-off 250 psi low/4,800 psi high
11/10/2018
11/10/2018
2.50
SLOT
WELLPR
PULD
T
PU/MU cleanout BHA#15
0.0
62.4
05:00
07:30
11/10/2018
11/10/2018
1.55
SLOT
WELLPR
TRIP
T
RIH with cleanout BHA#15, pumping
62.4
7,060.0
07:30
09:03
11.8 KWF at 1 BPM IAlOA=
657psi/509psi
11/10/2018
11/10/2018
0.15
SLOT
WELLPR
DLOG
T
Log Kt, +19' correction
7,060.0
7,088.0
09:03
09:12
11/10/2018
11/10/2018
0.30
SLOT
WELLPR
TRIP
T
Continue to RIH, Wt Chk at 71 DO' =
7,088.0
7,340.0
09:12
09:30
30K, slow down and tum around at
7340', did not stack out on whipstock
or stuck end of coil
11/10/2018
11/10/2018
1.50
SLOT
WELLPR
CIRC
T
PUH to new TOWS depth 7315' and
7,340.0
7,315.0
09:30
11:00
displace well to 8.6 ppg Power Pro
11/10/2018
11/10/2018
2.00
SLOT
WELLPR
CIRC
T
On bottom, recip pipe and clean hole
7,315.0
7,315.0
11:00
13:00
pumping 1.8 BPM, drop rate to 1.6
BPM for 15 minutes to calibrate
choke, continue to recip pipe while
building sweeps in mud pits, circ�3800
psi diff=400 psi IA=669 OA=569
11/10/2018
11/10/2018
2.25
SLOT
WELLPR
CIRC
T
POOH pumping with 1.8 BPM, making
7,315.0
62.4
13:00
15:15
multipleo
/ gging passes and pumping
three 5x5 sweeps
11/10/2018
11/10/2018
1.60
SLOT
WELLPR
PULD
T
PUD BHA #15, WHP=775 psi
62.4
0.0
15:15
18:51
11/10/2018
11/10/2018
1.30
PROD1
RPEQPT
PULD
T
PD, WS setting BHA
0.0
73.6
16:51
18:09
11/10/2018
11/10/2018
1.50
PROM
RPEQPT
TRIP
T
RIH, with WS settling BHA#16, 3-1/2"
73.6
7,090.0
18:09
19:39
Monobore XL Whipstock
11/10/2018
11/10/2018
0.20
PROM
RPEQPT
DLOG
T
Log the K1 marker correction of minus
7,090.0
7,128.8
19:39
19:51
6,0'
11/10/2018
11/10/2018
0.20
PRODt
RPEQPT
DLOG
T
Continue IH to setting depth, close
7,128.8
7,325.5
19:51
20:03
EDC
11/1012018
11/10/2018
0.15
PROD1
RPEQPT
DLOG
T
7,315', (Anchor @ 0" HS), PUW 35 k,
7,325.5
7,315.0
20:03
20:12
RBIH to setting depth, PUW 32 k,
bring pump up to shear 5,400 psi, set
down 5.5 k DHWOB, PUW 35 k
11/10/2018
11/10/2018
1.50
PRODt
RPEQPT
TRIP
T
POOH, pumping 1.2 bpm at 2,775 psi
7,315.0
73.6
20:12
21:42
11/10/2018
11/10/2018
1.00
PROM
RPEQPT
PULD
T
PUD, WS setting tools
73.6
0.0
21:42
22:42
11/10/2018
11111/2018
1.30
PROD1
WHPST
PULD
T
PD, Window milling assembly
0.0
74.3
22:42
00:00
11/11/2018
11/11/2o18
1.40
PROD?
WHPST
TRIP
T
RIH, w/window milling assembly 0.6°
74.3
7,090.0
00:00
01:24
ako motor, re -run string reamer
(run#6) 2.80"OD and new DSM
2.80"OD
11/11/2018
11/11/2018
0.20
PROD1
WHPST
DLOG
T
Log the K1 marker correction of minus
7,090.0
7,128.0
01:24
01:36
6.5'
11/11/2018
11/11/2018
0.30
PRODt
WHPST
TRIP
T
Continue IH
7,128.0
7,315.0
01:36
01:54
11/11/2018
11/11/2018
0.10
PROW
WHPST
WPST
T
Dry tag TOWS @ 7,315', PUW 35 k
7,315.0
7,315.0
01:54
02:1
11/1112018
11/11/2018
5.00
PROD1
WHPST
WPST
T
Bdng pump online @ 1.7 bpm @
7,315.0
7,318.0
02:00
07:00
4,056 psi, Diff --530, WHP=325,
BHP=3,651, IA=659, OA=533
11/11/2018
11/11/2018
2.00
PROM
WHPST
WPST
T
Continue milling window @ 1.9
7,318.0
7,321.0
07:00
09:00
BPM/4120 psi, WHP=310 psi,
Diff=650 psi, BHP=3630 psi,
IA/OA--683/632,
WOB=1500 lbs
Page 25/39 ReportPrinted: 11/20/2018
Aerations Summary (with Timelog , pths)
3H-13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
StarlTime
6b Tme
OurlM
Pham
Op Catle
Actihly Coda
Tme P-T-X
Opmallaa
Stark Depth
(Ito)
End Depth M<a)
11/11/2018
11/11/2018
1.75
PROD1
WHPST
WPST
T
Continue milling window @1.9
7,321.0
7,325.0
09:00
10:45
BPM14020psi, WOB drops to 1030 lbs,
T/1/0=313/690/669, Di"- 10,
BHP=4245
11/11/2018
11/11/2018
2.00
PROD1
WHPST
WPST
T
Through window, mill 11' of rathole.
7,325.0
7,336.0
10:45
12:45
1.9BPM, circ=4200psi, Diff=750psi,
WOB=2300lbs, BHP=4400psi,
T/1/O=33716921688
11/11/2018
11/11/2018
2.40
PROD1
WHPST
REAM
T
Dress window, make 5 reaming
7,336.0
7,315,0
12:45
15:09
passes at 1 fpm, 2 at as drilled TF, 30°
ROHS, 30' LOHS, and 180' ROHS,
come offline with pumps and dry drift
window, clean.
11/11/2018
11/11/2018
1.60
TROD1
TRIP
T
Open EDC and POOH pumping 1.9
7,315.0
74.3
15:09
16:45
BPM
11/11/2018
11/11/2018
1.25
PROD1
WHPST
PULD
T
At surface, spaceout, PUD milling
74.3
0.0
16:45
18:00
BHA#17
Note: Mills gauged 2.80 no-go
11/11/2018
11/11/2018
1.00
PROD1
DRILL
PULD
T
PD, pre-loaded Bulk[ assembly
0.0
72.2
18:00
19:00
11/11/2018
11/11/2018
1.30
PROD1
DRILL
TRIP
T
Tag up, reset counters, RIH w/ Build
72.2
7,080.0
19:00
20:18
BHA#18, 2.5° ako, P104 bi-center bit
11/11/2018
11/11/2018
0.20
PROD1
DRILL
DLOG
T
Log the Kl markercormction of minus
7,080.0
7,108.3
20:18
20:30
5.5'
11/11/2018
11/11/2018
0.30
PROD1
DRILL
TRIP
T
Continue IH to bottom, close EDC,
7,108.37,336.0
20:30
20:48
PUW 36 k
11/11/2018
11/11/2018
0.70
PROD1
DRILL
DRLG
T
OBD, 1.9 bpm at 4,100 psi, Diff=600
7,336.0
7,423.0
20:48
21:30
psi, BHP=3,710, WHP=335, IA=691,
OA=638
11/11/2018
11/11/2018
0.20
PROD1
DRILL
WPRT
T
Short wiper up hole, PUW 37 k
7,423.0
7,090.0
21:30
21:42
11/11/2018
11/11/2018
0.20
PROD1
DRILL
DLOG
T
Log the K1 marker no correction,
7,090.0
7,335.0
21:42
21:54
continue IH log the RA marker, PUW
37 k
- Note: Offical Window Depths
TOWS=7,315'
BOW=7,320'
RA Marker-7321'
11/11/2018
11/11/2018
0.20
PROD1
DRILL
WPRT
T
Continue IH
7,335.0
7,423.0
21:54
22:06
11/11/2018
11/12/2018
1.90
PR0D1
DRILL
DRLG
T
BOBD, 1.9 bpm at 4,086 psi, Diff--515
7,423.0
7,616.0
22:06
00:00
psi, WHP=298, BHP=3,706, IA=694,
OA=673
11/12/2018
11/12/2018
2.20
PROD1
DRILL
DRLG
T
OBD, 1.9 bpm at 4, 181 psi, DlfF-530
7,616.0
7,760.0
00:00
02:12
psi, WHP=323, BHP=3,666, IA=688,
OA=649
Note: New mud at the bit @ 7,620'
11/12/2018
11112/2018
1.50
PR0D7
DRILL
TRIP
T
POOH
7,760.0
78.3
02:12
03:42
11/12!2018
91M212018
1.25
PROD1
DRILL
PULD
T
At surface, space out, PUD build
78.3
0.0
03:42
04:57 1
assembly
11/12/2018
11/12/2018
1.25
PROD1
DRILL
PULD
T
Make up and PD AL1 lateral drilling
0.0
78.3
04:57
06:12
BHA#19
11/12/2018
11/12/2018
1.50
PROD1
DRILL
TRIP
T
RIH
78.3
7,073.0
06:12
07:42
11/12/2018
11/12/2018
0.20
PRUD1
URILL
T
Log K1,-7.6 correction
7,073.0
7,117.0
07:42
07:54
11/12/2018
11/12/2018
0.30
PROD1
DRILL
TRIP
T
wt check @71 00'=34K, continue to
7,117.0
7,760.0
07:54
08:12
RIH to build TO
Page 26139 ReportPrinted: 1112012018
„ ,aerations Summary (with Timelog , aths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Tirtre log
StatTime
EMTme
Our (M)
Phase
Op Code
Nfivity Code
Time P -T -X
pperalion
Sled Depth
(RKB)
End Depth M)
11/1212018
11/1212018
0.40
PROM
DRILL
DRLG
T
Record free spin, diff=1671 psi, reset
7,760.0
7,827.0
08:12
08:36
WOB and tag build TD at 7660', drill
ahead, WOB=2700 lbs, Diff=1820 psi,
circ=5546 psi, BHP=5734 psi,
T/1/0=336/6811552, wt check
@7764'=35K
11/12/2018
11/12/2018
0.20
PROM
DRILL
WPRT
T
Returns drop off to 0.4 BPM (pumping
7,827.0
7,804.0
08:36
08:48
1.9 BPM), PUH to 7804' PUW=35K
11/1212018
11/1212018
0.10
PROM
DRILL
WPRT
T
RBIH
7,804.0
7,827.0
08:48
08:54
11/12/2018
11/12/2018
0.10
PROM
DRILL
DRLG
T
OBD, lose returns ay 7864'
7,827.0
7,864.0
08:54
09:00
11/1212018
11/12/2018
0.10
PROM
DRILL
WPRT
T
Pick up to above 7827' to let losses
7,864.0
7,827.0
09:00
09:06
heal, PUW=39K
11/1212018
11/12/2018
0.10
PROM
DRILL
WPRT
T
RBIH
7,827.0
7,864.0
09:06
09:12
11/12/2018
11/1212018
0.10
PROD?
DRILL
DRLG
T
OBD, plan for wipers to end of build
7,864.0
7,900.0
09:12
09:18
every 100'
11/1212018
11/12/2018
0.05
PROM
DRILL
WPRT
T
Wiper to EOB, PUW=38K
7,900.0
7,772.0
09:18
09:21
11/12/2018
11/12/2018
0.05
PROM
DRILL
WPRT
T
RBIH
7,772.0
7,900.0
09:21
09:24
11/12/2018
11/12/2018
0.60
PROM
DRILL
DRLG
T
OBD, WOB=16001bs, circ=5440 psi,
7,900.0
8,000.0
09:24
10:00
diff -1850 psi, BHP=5600 psi,
T/1/0=310/6841588
11/1212018
11/12/2018
0.10
PROM
DRILL
WPRT
T
Wiper trip to End of Build, PUW=38K
8,000.0
7,766.0
10:00
10:06
11/12/2018
11/12/2018
0.10
PROD1
DRILL
WPRT
T
RBIH
7,766.0
8,000.0
10:06
10:12
11/12/2018
11/12/2018
3.50
PROM
DRILL
DRLG
T
OBD, performing BHA wipers every
8,000.0
8,400.0
10:12
13:42
100' drilled, 1.9 BPM @ 5512 psi,
Diff --2035 psi, BHP=5755 psi,
T/1/0=307/687/602, WOB=2520 lbs,
PUW=37K@8100', 37K@8200',
40K@8358'
11/12/2018
11/1212018
0.25
PROM
DRILL
WPRT
T
Wiper trip to EOB 7770', PUW=40K
8,400.0
7,770.0
13:42
13:57
11/12/2018
11/12/2018
0.35
PROM
DRILL
WPRT
T
RBIH, set down 1400 Ibis WOB at
7,770.0
8,400.0
13:57
14:18
8300' MD (near end of high GR
section), PU 10' and RBIH no problem
11/1212018
11/12/2018
3.00
PROM
DRILL
DRLG
T
OBD at 1.9 BPM/5634 psi,
8,400.0
8,810.0
14:18
17:18
WOB=2510 lbs, Diff --1961 psi,
BHP=5731 psi, T/1/0=277/697/673,
pull BHA wipers every 100',
PUW's=37K@8505', 38K@8600',
38K@8700-
1111212018
11/12/2018
0.87
PROM
DRILL
WPRT
T
Wiper up hole to the window, PUW 38
8,810.0
7,336.0
17:18
18:10
k
11112/2018
11/12/2018
0.20
PROD1
DRILL
DLOG
T
Log the RA marker correction of plus
7,336.0
7,363.0
18:10
18:22
1
1
2.5'
11/12/2018
11/1212018
0.65
PROM
DRILL
WPRT
T
Wiper back in hole, RIW 10 k, 8,200'
7,363.0
8,749.0
18:22
19:01
notice pump (bore) pressure climbing,
continue IH, attempt to bring pump
rate up to drilling rate, 1.53 bpm at
2000 psi Diff.
11/12/2018
11/12/2018
2.80
PROM
DRILL
TRIP
T
POOH, to inspect BHA (agitator),
8,749.0
78.2
19:01
21:49
performing Jog above window, and @
1,990' (700'),
Page 27139 Report Printed: 11/20/2018
Aerations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
821 Tone
Erb Tine
Our@0
Phase
Op Cotle
Mdrky Cotle
7me P -T -x
Operalim
slad oePM
(fit®)
End Depth lfll(B)
11/12/2018
11/12/2018
1.69
PROD1
DRILL
PULD
T
At surface, space out, PUD drilling
78.2
0.0
21:49
23:30
BHA#19
"' Note: Found Lower Bearing
housing on mud motor had backed
completly off.
11/12/2018
11/13/2018
0.49
PROD1
DRILL
PULD
T
PD, All lateral drilling BHA #20
0.0
78.2
23:30
00:00
11/13/2018
11/13/2018
1.00
PROD1
DRILL
PULD
T
Finish PD lateral drilling BHA #20
78.2
78.2
00:00
01:00
11/13/2018
11/13/2018
1.60
PROD1
DRILL
TRIP
T
RIH, with AL1 lateral drilling BHA#20,
782
7,090.0
01:00
02:36
0.5° ako, RR bi-center bit, surface test
agitator@ 517' (good -test)
11/13/2018
11/13/2018
0.20
PROD1
DRILL
DLOG
T
Log the K1 correction of minus 5.5',
7,090.0
7,128.0
02:36
02:48
PUW 37k
"' Note: 7.5 hire NPT (BHI)
11/13/2018
11/13/2018
0.65
PROD?
DRILL
TRIP
T
Continue IH, setting down @ 8,228',
7,128.0
8,296.0
02:48
03:27
PUW 38 k, lower pump rate RBIH,
clean pass spot brought pump back
up to 1.5 bpm, set down again at DTF
8,296', PUW 50k, -6 k DHWOB,
continued up hole, seeing drag -1.1 k-
3.2 k,
11/13/2018
11/13/2018
1.20
PROD1
DRILL
WPRT
T
Continue PUH, pumping bottoms up,
8,296.0
7,605.0
03:27
04:39
sand in sample (no -rocks), make call
Ito TT.
11/13/2018
11/13/2018
0.30
PROD1
DRILL
WPRT
T
RBIH to 8,200', line up and pump 5x5
7,605.0
8,200.0
04:39
04:57
sweep hilow,
11/13/2018
11/13/2018
1.00
PROD1
DRILL
WPRT
T
Chase sweep to surface
8,200.0
5,500.0
04:57
05:57
11/13/2018
11(13/2018
1.20
PROW
DRILL
TRIP
T
RBIH, log K1 +2' correction, set dawn
5,500.0
8,254.0
05:57
07:09
@ 8222' WOB=2K PUW=38K, pull up
50' and RIH, set down @ 8254'
WOB=3.1 K PUW=38K, pick up 100'
and RIH again, set down @ 8212'
WOB=3.5K PUW=45K, pick up 40'
and RBIH, set down @ 8245'
WOB=2.6K PUW=38K
11/13/2018
11/13/2018
0.30
PRODt
DRILL
WPRT
T
PUH and confer with Town Engineer
8,254.0
7,342.0
07:09
07:27
11/13/2018
11/13/2018
0.20
PROD1
DRILL
WPRT
T
RBIH to a cleanout depth of 8100'
7,342.0
8,100.0
07:27
07:39
.
11/13/2018
11/13/2018
3.20
PROD1
DRILL
WPRT
T
Cleanout hole from 8100' pumping
8,100.0
78.2
07:39
10:51
5x5 sweeps and making multiple jogs
in on way out of hole, HOT tool cutting
out on way out of hole, will inspect at
surface and run new BHA
11/13/2018
11/13/2018
1.10
PROD1
DRILL
PULD
T
Tag up, PUD ALl lateral drilling BHA
78.2
0.0
10:51
11:57
#20
11/13/2018
11/13/2018
1.50
PROD1
STK
PULD
T
Make up and PD aluminum billet
0.0
73.4
11:57
13:27
1
WOH Anchor BHA #21
11/13/2018
11/13/2018
1.40
PROD1
STK
TRIP
T
RIH with BHA #21 @ 60 fpm w/EDC in
73.4
7,054.0
13:27
14:51
Open position, slow down through
window, build, and openhole sections
11/13/2018
11/13/2018
0.20
PRODi
STK
DLOG
T
Log K1, -7' correction
7,054.0
7,120.0
14:51
15:03
11/13/2018
11/13/2018
0.40
PROD1
STK
TRIP
T
RIH to 6011.78' and pull slack out of
7,120.0
8,011.8
15:03
15:27
coil to set Top of Billet at 8000'
Page 28139 Report Printed: 11120/2018
perations Summary (with Timelog . _pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
stenrme
End lkne
Dix IN)
nese
Dp code
n<uwN Code
Tkw P -Tat
opereuon
Stift Depth
M)
End Depth MM
11/13/2018
11/13/2018
0.20
PROD
STK
WPST
T
PUW=34K pre-set, close EDC and
8,011.8
8,011.8
15:27
15:39
come online w/pumps, sheared at
5166 psi / 1.2 BPM (DiH=1500 psi), set
down 3600 lbs to confirm Openhole
Anchored Billet is set.
11/13/2018
11/13/2016
1.50
PROD1
STK
TRIP
T
POOH
8,011.8
61.7
15:39
17:09
11/13/2018
11/13/2018
2.00
PROD1
STK
PULD
T
PUD, setting tools, crew change,
61.7
0.0
17:09
19:09
PJSM, swap out tools, PU motor and
agitator, LD MWD tool, PU Res tool,
MU HOT-FVS, scribe to motor.
11/13/2018
11/13/2018
1.00
PROM
9 -TK -TU -LD
T
PD, kickoff/drilling BHA, MU to upper
0.0
78.3
19:09
20:09
quick, surface test (good -test), MU
INJH, tag up, re -set counter depths,
check pac-offs (good)
11/1312018
11/13/2018
11/13/2018
1.25
FR
STK
TRIP
T
RIH, w/kickoff/drillingHA
B#22,
78.3
7,090.0
20:09
21:24
•" Note: Test agitator 1.5 bpm @
4,141 psi, and 1.9 bpm @ 5,100 psi
11/13/2018
11/13/2018
0.20
PROD1
STK
DLOG
T
Log the K1 marker correction of minus
7,090.0
7,128.0
21:24
21:36
7.5', PUW 34 k
11/13/2018
11/13/2016
0.50
TROD1
TRIP
T
Continue IH, dry tag TOB @ 8,000',
7,128.0
8,000.0
21:36
22:06
2.5k DHWOB, PUW 35 k
11/13/2018
11/13/2018
0.13
PROD1
STK
KOST
T
PUH, obtain drilling parameters, 1.9
8,000.0
7,999.0
22:06
22:13
bpm at 5,082 psi, Diff -1,215 psi,
WHP=256, BHP=3,725, IA=698,
OA=645
11/13/2016
11/13120180.80
PROD1
STK
KOST
T
Kickoff billet @ time drilling @ 1 ft/hr
7,999.0
8,000.2
22:13
23:01
11/13/2018
11/13/2018
0.60
PROD1
STK
KOST
T
Kickoff billet @ time drilling -92 2 R/hr
8,000.2
8,001.2
23:01
23:37
11/13/2018
11/13/2018
0.20
PROD1
STK
KOST
T
Kickoff billet @ time drilling @ 3 R/hr
8,001.2
8,001.9
23:37
23:49
11/13/2018
11/14/2018
0.17
PROD1
DRILL
DRLG
T
Drill ahead @ 1 k DHWOB
8,001.9
8,011.0
23:49
00:00
11/14/2018
11/14/2018
0.67
PROD1
DRILL
DRLG
T
Drilling Ahead, 1.9 bpm at 5,082 psi,
8,011.0
8,124.0
00:00
00:40
Diff --1,215 psi, WHP=189,
BHP=3,748, IA=698, OA=648
DHWOB=2.0 k
CTSW=11.0 k
11/14/2018
11/14/2018
0.10
PROD1
DRILL
WPRT
T
PUH, dry drift kickoff point (clean) ,
8,124.0
7,970.0
00:40
00:46
PUW 35 k
11/14/2018
11/14/2018
0.10
PROD1
DRILL
WPRT
T
Wiper back in hole, RIW 12 k
7,970.0
8,124.0
00:46
00:52
-PRO
11/14/2018
11/14/2018
1.30
D1
DRLG
T
OBD, 1.9 bpm at 5,115 psi, Diff -1,215,
8,124.0
8,350.0
00:52
02:10
WHP=213, BHP=3,747, IA=698,
OA=649
DHWOB=1.9-2.4 k
CTSW=8-12 k
11!1412018
11/14/2018
0.20
PRODt
DRILL
WPRT
T
Wiper up hole, PUW 38 k
8,350.0
8,080.0
02:10
02:22
11/14/2018
11/14/2018
0.20
PRODt
DRILL
WPRT
T
Wiper back in hole, RIW 12 k
8,080.0
8,350.0
02:22
11/1412018
2016
1.35
PRODI
DRILL
DRLG
T
BOBD, 1.9 bpm at 4,962 psi,
8,350.0
8,550.0
02:34
Diff=1,155 psi, WHP=210,
!!!!
BHP=3,789, IA=701, OA=671
DHWOB=2.5 k
CTSW=9.0 k
Page 29139 Report Printed: 11/2012018
perations Summary (with Timelog _ _pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Slav Time
EM Tme
our Qu)
Phase
OP Cade
rcwiy Code
Time P -T -X
operation
sten Depth
Me)
FSM Depth MUM
11/14/2018
11/14/2018
0.15
PROD1
DRILL
WPRT
T
100' Wiper up hole, PUW 40 k
8,550.0
8,550.0
03:55
04:04
11/1412018
11/14/2016
1.50
PROD1
DRILL
DRLG
T
OBD, 1.9 bpm at 5,114 psi,
8,550.0
8,780.0
04:04
05:34
BHP=3,787, WHP=207, IA=702,
OA=671
DHWOB=2.1 k
CTSW=8.0 k
11/14/2018
11/142018
0.30
PROD1
DRILL
WPRT
T
Wiper up hole, PUW 35K
6,760.0
8,035.0
05:34
05:52
11/14/2018
11114/2018
0.20
PROD1
DRILL
WPRT
T
Wiper back in hole, RIW 12K
8,035.0
8,780.0
05:52
06:04
11/14/2018
11/14/2018
0.70
PROD1
DRILL
DRLG
T
BOBD, 1.9 bpm at 5650 psi,
8,780.0
8,880.0
06:04
06:46
Diff=1,670 psi, WHP=210, BHP=5470
DHWOB=2.5 k
11/14/2018
11/14/2016
o.10
PRODt
DRILL
DRLG
T
100'wiper up hole, PUW=40K
8,880.0
8,880.0
06:46
06:52
11/14/2018
11/14/2018
0.80
PROD1
DRILL
DRLG
T
BOBD. 1.9 bpm at 5419 psi, Diff=1490
8,880.0
8,980.0
06:52
07:40
psi, WHP=210, BHP=5289, IA=703,
OA ---693
DHWOB=2.1 K
11/142018
11/14/2018
0.10
PROD1
DRILL
WPRT
T
100' wiper Up hole,PUW=35K
8,980.0
8,980.0
07:40
07:46
11/14/2018
11/14/2018
0.50
PROD1
DRILL
DRLG
T
OBD, 1.9 BPM @ 5583 psi, Diff=1564
8,980.0
9,080.0
07:46
08:16
psi, WHP=219, BHP=5412, IA=703,
OA -693
WOB=2.1K
11/14/2018
11/1412018
0.10
PROD1
DRILL
WP RT
T
100'wiper up hole, PUW=35K
9,080.0
9,080.0
08:16
08:22
11/14/2018
11/14/2018
1.50
PROD1
DRILL
DRLG
T
OBD, 1.9 BPM @ 5584 psi, Diff=1561
9,080.0
9,190.0
08:22
09:52
psi, WHP=233 psi, BHP=5362 psi,
IA=703, OA=697
WOB=2.2K
11/14/2018
71/142018
0.80
PR0D1
DRILL
WPRT
T
Window Wiper, PUW=38K
9,190.0
7,334.0
09:52
10:40
11/142018
11/14/2018
o.76
PROD1
DRILL
WPRT
T
Wiper back in hole, RIW=12K
7,334.0
9,190.0
10:40
11:22
11/142018
11/14/2018
0.50
15ROD1
DRILL
DRLG
T
OBD, 1.9 BPM @ 5619, Diff=1550,
9,190.0
9,290.0
11'22
11:52
BHP=5349
WOB=1540 Ibs
HKLD=2K
*Mud Swap: Begin pumping new mud
at 9262"
11/14/2018
11/14/2018
0.10
PROD1
DRILL
WPRT
T
BHA Wiper 100' up hole, PUW=36K
9,290.0
9,290.0
11:52
11:58
11/14/2018
11/14/2018
0.60
PROD1
DRILL
DRLG
T
OBD, 1.9 BPM @ 4920 psi,
9,290.0
9,390.0
11:58
12:34
Diff=1102psi, WHP=289, BHP=4863,
IA=697, OA=664
WOB=2.3K
11/14/2018
11/14/2018
0.10
PROD1
DRILL
WPRT
T
100'wiper uphole, PUW=36K
9,390.0
9,390.0
12:34
12:40
11/14/2018
11/14/2018
0.80
PROD1
DRILL
DRLG
T
OBD, 1.9 BPM @ 5270 psi, Diff=1511,
9,390.0
9,490.0
12:40
13:28
WHP=321, BHP=5346, IA=696,
OA=655, WOB=2.5K
11/14/2018 11/142016
0.10
PROD1
DRILL
WPRT
T
100'wiper uphole,PUW=39K
9,490.0
9,490.0
13:28 13:34
Page 30139 ReportPrinted: 11/2012018
aerations Summary (with Timelog . .pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SM TM
ew Tire
DN"
Ph1
�tAtl=
ArlA'IIrC�B
rrI118 P -r -Jt
�r�
S D.PM
em nepn(flka)
11/14/2018
11/14/2018
0.80
PROD1
DRILL
DRLG
T
OBD, 1.9 BPM @ 5127 psi, Diff -1302,
9,490.0
9,590.0
13:34
14:22
WHP=306, BHP=5229, IA=695,
OA=629, WOB=2.2K
11/14/2018
11/14/2018
0.20
PROD1
DRILL
WPRT
T
Wiper trip, PUW=38K
9,590.0
8,590.0
14:22
14:34
11/14/2018
11/14/2018
0.30
PROD1
DRILL
WPRT
T
RBIH
8,590.0
9,590.0
14:34
14:52
11/14/2018
11/14/2018
1.30
TRODI
DRLGTRLG
T
BOBD, 1.9 BPM @ 5301 psi,
9,590.0
9,741.0
14:52
16:10
Diff --1450, WHP=299, BHP=5332,
IA=694, OA=11, WOB=2.4K
MWD tools acting up @ 9671' (DGS,
HOT, DPS, RES all intermittent,
continue drilling ahead)
11/14/2018
11/14/2018
2.25
PROD1
DRILL
TRIP
T
Decision made to POOH to inspect
9,741.0
78.3
16:10
18:25
and changeout BHA, PUW=38K
11/14/2018
11/14/2018
2.20
PROD1
DRILL
PULD
T
PJSM, Driller side PDL froze„ work SL
78.3
0.0
18:25
20:37
free, PUD, AL1 drilling BHA#22
11/14/2018
11/14/2018
1.70
PROD1
DRILL
PULD
T
PD preloaded tools, AL1 drilling BHA
0.0
78.3
20:37
22:19
#23, PU/MU INJH to BHI tools, perfom
sufaoe test (ggod-test), continue onto
stabbing the INJH, space out, re -set
depths
11/14/2018
11/14/2018
1.35
PROD1
DRILL
TRIP
T
RIH MALI drilling assembly 0.5'- ako
78.3
7,090.0
22:19
23:40
motor, and RR bi-center bit.
11/14/2018
11/14/2018
0.20
PROD1
DRILL
DLOG
T
Log the K1 marker correction of minus
7,090.0
7,128.0
23:40
23:52
5.5'
11/1472018
11/15/2018
0.13
PROD-
DRILL
TRIP
T
Continue IH
7,128.0
7,430.0
23:52
00:00
"** Note:7.3 hrs NPT (BHI)
11/15/2018
11/15/2018
0.80
PROM
DRILL
TRIP
T
Continue IH
7,430.0
9,741.0
00:00
00:48
11/15/2018
11/15/2018
1.00
PRODt
DRILL
DRLG
T
BOBO, 1.9 bpm at 4,944 psi,
9,741.0
9,897.0
00:48
01:48
Diff --1,096 psi, WHP=332,
BHP=3,882, IA=692, OA=594
11/15/2018
11/15/2018
0.10
PROD1
DRILL
WPRT
T
100'BHA wiper up hole, PUW
9,697.0
9,812.0
01:48
01:54
11/15/2018
11/15/2018
0.10
PROD1
DRILL
WPRT
T
Wiper back in hole, RIW 9.4 k
9,812.0
9,897.0
01:54
02:00
11/15/2018
11/15/2018
1.25
PROD1
DRILL
DRLG
T
BOBO, 1.9 bpm at 4,944 psi,
9,897.0
10,100.0
02:00
03:15
Diff -1,096 psi, WHP=332,
BHP=3,882, IA=692, OA=594
11/15/2018
11/15/2018
1.10
PROD1
DRILL
WPRT
T
TD 10,100', chase 5x5 to window
10,100.0
7,315.0
03:15
04:21
11/15/2018
11/15/2018
1.60
PROD1
DRILL
WPRT
T
Continue wiper to the swab valve,
7,315.0
69.5
04:21
0557
PUW 35 k, performing jogs @ 5,000',
1,500', and 500'
11/15/2018
11/15/2018
1.30
PROD1
DRILL
TRIP
T
Trip back in hole
69.5
7,000.0
05:57
07:15
11/15/2018
11/15/2018
0.10
PROD1
DRILL
DLOG
T
Log K1,+27'conection
7,000.0
7,113.0
07:15
07:21
11/15/2018
11/15/2018
0.40
PROD1
DRILL
DLOG
T
Perform static pressure survey above
7,113.0
7,300.0
07:21
07:45
the window, trap 11.8 ppg and falls off
to 11.6 ppg in 14 minutes
11!15/2018
11/15/2018
0.10
PROD1
DRILL
DLOG
T
Continue to RIH, log RA, no
7,300.0
7,361.0
07:45
07:51
correction,
11/15/2016
11/15/2018
1.00
PROD1
DRILL
TRIP
T
RIH, confirm TO at 10,100', PUW=33K
7,361.0
10,100.0
07:51
08:51
11/15/2018
11/15/2018
1.10
PROD1
DRILL
DISP
T
Circulate off bottom while weighting up
10,100.0
10,100.0
08:51
09:57
liner
running pill, 1.55 BPM @ 4050
psi
Page 31139 ReportPrinted: 1112012018
Aerations Summary (with Timelog , .pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Slat True
End7me
Du (hr)
Phm
Op Code
ACWXJCode
Tune P.T-X
Operation
Start Depar
(al®)
End DepN(WB)
11/15/2018
11/15/2018
1.50
FROM
DRILL
DISP
T
Lay in 11.8 ppg NaBR liner running pill
10,100.0
6,000.0
09:57
11:27
with 2 ppb alpine beads (52 BELS),
paint TD flag at 8633.4' and
11/15/2018
11/15/2018
1.20
PROM
DRILL
U1,5 I,
T
Continue POOH laying in 11.8 ppg
6,000.0
78.3
11:27
12:39
NaBR completion fluid, paint window
flag @ 5778.3'
11/15/2018
11/15/2018
0.60
PROM
DRILL
DISP
T
Flow check well to confirm killed,
78.3
78.3
12:39
13:15
SIMOPS: PJSM for running liner
11/15/2018
11/15/2o18
0.5o
PROD1
DRILL
PULD
T
Lay down BHA#23
78.3
0.0
13:15
13:45
11/15/2018
11/15/2018
0.70
PROD?
CASING
PUTB
T
Prep rig floor for running liner
0.0
0.0
13:45
14:27
11/15/2018
11/1512018
2.00
FROM
CASING
PUTB
T
Make up Non=ported bullnose, 47
0.0
1,495.8
14:27
16:27
joints of 2-3/8" 4.7# L-80 ST -L Slotted
Liner, and shorty deployment sleeve
11/15/2018
11/15/2018
1.40
5ROD1
CASING
PULD
T
Pick up coil track tools for liner running
1,495.8
1,540.0
16:27
17:51
BHA #24
11/15/2018
11/15/2018
1.00
PROD1
CASING
RUNL
T
RIH with lower liner segment
1,540.0
7,240.0
17:51
18:51
11/15/2018
11/15/2018
0.50
PROD1
CASING
RUNL
T
Come offline with pumps, continue
7,240.0
8,420.0
18:51
19:21
RIH, HKLD=I9K
11/16/2018
11/15/2018
0.10
FROM
CASING
DLOG
T
slow down to log K1, O' correction
8,545.0
8,603.0
19:21
19:27
11/15/2018
11/15/2018
0.70
PROD1
CASING
RUNL
T
continue in hole, work liner down from
8,603.0
10,100.0
19:27
20:09
8603' to 8805' making multiple
pickups, weight starts to come back
and continue RIH at 50 fpm, 14K
HKLD
11/15/2018
11/15/2018
0.10
PR5D1
CASING
RUNL
T
Tag bottom at 10,100', PUW=45K, set
10,100.0
8,604.2
20:09
20:15
back down and come online with
pumps 1.4BPMI3000psi, release off
liner, PUW=33K
11/15/2018
11/15/2618
2.00
PROD1
CASING
TRIP
T
Trip out of hole, pumping down
8,604.2
44.2
20:15
22:15
1
backside
11/15/2018
11/15/2018
0.50
FROM
CASING
PULD
T
L/D lower liner running BHA#24
44.2
0.0
22:15
22:45
11/15/2018
11/15/2018
1.00
FROM
CASING
PUTB
T
Prep Rig floor for running liner
0.0
0.0
22:45
23:45
11/15/2018
11/16/2018
0.25
PROD1
CASING
PUTB
T
Start PU upper slotted liner segment
0.0
94.3
23:45
00:00
11/16/2018
11/16/2018
2.00
PRODt
CASING
PUTB
T
Continue PU slotted liner 3-363
94.3
1,128.2
00:00
02:00
11/16/2018
11116/2018
0.25
FROM
CASING
PULD
T
RD liner running equipment.
1,128.2
1,128.2
02:00
02:15
11/16/2018
11/162018
0.60
PROD1
CASING
PULD
T
PUIMU ColitrakTools, surface test
1,128.2
1,172.4
02:15
02:51
(good -test), inspect pac-off (good),
"' Note: Hanging weight 5,600 lbs
11/16/2018
11/16/2018
1.25
PROD1
CASING
RUNL
T
Tag up, reset counters, RIH w/BHA
1,172.4
7,182.0
02:51
04:06
1
#25
11/16/2018
11/16/2018
0.15
PROD1
CASING
RUNL
T
Correct to the EOP flag (minus 9.16'),
7,182.0
7,182.0
04:06
04:15
PUW 35 k
11/1612018
11/16/2018
1.70
PROD1
CASING
RUNL
T
Continue IH, work liner down 6,232'-
7,182.0
8,603.1
04:15
05:57
8603.4'
11/161201811/16/2018
0.60
PROD1
CASING
RUNL
T
Bring pump up to 1.4 bpm @ 2,046
8,603.1
8,603.1
05:57
06:33
psi, 59 psi differential pressure, unable
to release from liner. decision was
made to POOH
11/16/2018
11/16/2018
1.50
PROD1
CASING
RUNL
T
Line up across the top, POOH
8,603.1
1,123.3
06:33
08:03
11/162618
11/16/2018
0.50
PROD1
CASING
PULD
T
At surface, check well for flow, LD
1,123.3
1,123.3
08:03
08:33
Coiltrak tools, found EDC
Page 32139 ReportPrinted: 11/20/2018
Aerations Summary (with Timelog � pths)
3H -13A
C.nocoPhilllps
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
SFetroe
Erre rma
OuDX(hr)please
op Cage
Activity Code
Tone 0.T -X
Operation
slatyo"
(Po®)
EM Depth (100)
11/16/2018
11/16/2018
1.50
PRODt
CASING
PULD
T
77U -new BHA#26, surface test (good-
1,123.3
1,172.4
08:33
10:03
test), stab INJH
"' Note: Hanging weight 5,800 Ilbs
11/16/2018
11/16/2018
1.25
PROW
CASING
RUNL
T
RIH, w/upper liner segment 36 jts of
1,172.4
7,128.4
10:03
11:18
slotted liner, shorty deployment
sleeve, and ported bullnose
11/16/2018
11/16/2018
0.15
PROD1
CASING
RUNL
T
Correct to the EOP flag (minus 9.76)
7,128.4
7,128.4
11:18
11:27
11/16/2018
11/1612018
0.50
PROD1
CASING
RUNL
T
Continued IH clean to TO 8603.4'
7,128.4
8,603.4
.11:27
11:57
'- Note: NPT time 5 him (BHI)
11/16/2018
11/16/2018
0.20
PROD1
CASING
RUNL
T
Set down on bottom, PUW 36 k, bring
8,603.4
7,475.4
11:57
12:09
pump up to 1.5 bpm at 3,400 psi, 1019
psi differentual, PUW 32 k
11/16/2018
11/16/2018
1.00
PROD1
CASING
TRIP
T
POOH, pumping across the top
7,475.4
44.2
12:09
13:09
11/16/2018
11/16/2018
0.70
PROD1
CASING
PULD
T
Atsurface, check well for flow, LD
44.2
0.0
13:09
13:51
setting tools on a dead well.
11/16/2018
11/16/2018
0.60
PROD1
CASING
CTOP
T
Perform a function test
0.0
0.0
13:51
14:27
11/16/2018
11/16/2018
0.65
PROD1
CASING
PULD
T
Pi OH Anchored Billet and CoilTrak
0.0
73.4
14:27
15:06
toolst, MU UQC, surface test (good -
test), Stab INJH, tag up, reset counter
depths
11/16/2018
11/16/2018
1.46
PROD1
CASING
TRIP
T
RIH, w/OH Anchored Billet BHA#27
73.4
7,095.0
15:06
16:30
11/16/2018
11/16/2018
0.20
PROW
CASING
DLOG
T
Log the K1 correction of minus 7.0',
7,095.0
7,119.0
16:30
16:42
-
PUW 35 k, close EDC @ 7305.7'
11/16/2018
11/16/2018
0.20
PROD1
CASING
TRIP
T
Continue IH
7,119.0
7,474.4
16:42
16:54
11/16/2018
11/16/2018
0.20
PROW
CASING
WPST
T
Set down on depth, PUH 32 k, bring
7,474.4
7,463.7
16:54
17:06
pump up to shear @ 3,100 psi, PUW
34 k
11116/2018
11/16/2018
1.30
PRODt
CASING
WPST
T
POOH, tag up, PJSM, flow check
7,463.7
73.0
17:06
18:24
11/16/2018
11/16/2018
070
PROD1
CASING
PULD
T
LD BHA #26
73.0
0.0
18:24
19:06
11/16/2018
11/16/2018
0.90
PRODS
STK
PULD
P
PU BHA#27 KO/Drill Assembly
0.0
78.0
19:06
20:00
(agitator, 0.5° AKO motor, RB Hughes
P104 bit), slide in cart, change out
UQC checks, check pack -offs, good,
MU to coil
11116/2018
11/16/2018
1.30
PRODS
STK
TRIP
P
RIH w/ BHA #28, shallow test at
78.0
7,090.0
20:00
21:18
500' (pipe vibrating significantly,
though little to no read-out on
transducer screen, possibly b/c
pumping 11.8 KW)
11/16/2016
11/16/2018
0.10
PRODS
STK
DLOG
P
Log K1 for a-6.5' correction
7,090.0
7,120.0
21:18
21:24
11/16/2018
11/16/2018
0.30
PRODS
STK
TRIP
P
Continue RIH
7,120.0
7,288.0
21:24
21:42
11/16/2018
11/16/2018
0.80
PROD3
STK
DLOG
P
Displace to PowerPro drilling fluid w/
7,288.0
7,288.0
21:42
22:30
EDC closed, PUW = 32K
11/16/2018
11!16/2618
0.30
PR553
STK
TRIP
P
Continue RIH, dry tag TOB @ 74623,
7,288.0
7,461.8
22:30
22:48
come up to milling rate„ PUW = 32K,
tag 7461.8' pumping
11/1612018
11/16/2018
0.90
PRODS
STK
KOST
P
Milling off billet 1 fph for 1 ft, CWT =
7,461.8
7,462.8
22:48
23:42
18K, WOB=0.5K„BHP =3705 psi,
WHP = 381 psi,
11/16/2018
11/17/2018
0.30
PRODS
STK
KOST
P
Go to 2 fph for 1 ft, CWT = 16K, WOB
7,462.8
7,463.4
23:42
00:00
= .1 K
Page 33139 Report Printed: 11/20/2018
Aerations Summary (with Timelog . _pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Sial Tna
Bet TIMDalh4
Pham
Op Code
ikinly Catle
Tare P -T -x
Operation
Slat Depth
(WB)
Ertl Depth MO)
11/17/2018
11/17/2018
0.20
PROD3
STK
-0-ST
P
Continue 2 fph for 1 ft
7,463.4
7,463.8
00:00
10GA2
11/172018
11117/2018
0.30
PRODS
STK
KOST
P
Go to 3 fph for 1', begin pushing on it
7,463.8
7,464.8
00:12
00:30
1
11/172018
11/17/2018
0.70
PRODS
DRILL
DRLG
P
Drilling, CWT = 3.5K, WOB = 1.5K,
7,464.8
7,584.0
00:30
01:12
BHP = 3684 psi, WHP = 322 psi, circ
= 4791, 1.9 bpm in, 1.85 bpm out,
pump 5x5 sweeps
11/172018
11/17/2018
0.20
PRODS
DRILL
WPRT
P
PUW = 35K, drift billet area up &
7,584.0
7,584.0
01:12
01:24
down, clean, RBIH
11/1712018
11/172018
1.80
PRODS
DRILL
DRLG
P
OBD, CWT= 15K, WOB= 1.4K, BHP
7,584.0
7,900.0
01:24
03:12
= 3680 psi, WHP = 245 psi, circ =
4900 psi, 1.9 bpm, pull 100' wipers
every 100', towards planned 400' drill
interval, pump 5x5 sweeps, Avg ROP
= 175 fph
PUW's = 36K -39K, capture transducer
sceen off bottom
11/17/2018
11/17/2018
0.20
PRODS
DRILL
WPRT
P
Wiper up -hole, PUW =36K
7,900.0
7,500.0
03:12
03:24
11/17/2018
11/17/2018
0.20
PROD3
DRILL
WPRT
P
Wiper in-hole, RIW = 15K
7,500.0
7,90G.0
03:24
03:36
11/17/2018
11/17/2018
0.70
PROD3
DRILL
DRLG
P
Drilling, 1.9 bpm, FS = 1050 psi, CWT
7,900.0
8,000.0
03:36
04:18
= 13K, WOB = 2.5K, BHP = 3688 psi,
WHP = 278 psi, circ = 5069 psi,
continue 100' drilled & 100' wiper
POW's = 37K
11/1712018
11/17/2018
0.15
PROD3
DRILL
WPRT
P
1 00'wiper up hole PUW 37 k
8,000.0
8,000.0
04:18
04:27
11/17/2018
11117/2018
0.70
PRODS
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,758 psi, Diff=239
8,000.0
8,100.0
04:27
05:09
psi, WHP=323, BHP=3,754, IA=695,
OA=688
11/172018
11/1712018
0.15
PRODS
DRILL
WPRT
P
100' wiper up hole PUW 37 k
8,100.0
8,100.0
05:09
05:18
11/17/2018
11/17/2018
0.42
PROD3
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,782 psi, Diff=239
8,100.0
8,200.0
05:18
05:43
psi, WHP=323, BHP=3,754, IA=695,
OA=688
11/17/2016
11/17/2018
0.15
FROM
DRILL
WPRT
P
100' wiper up hole PUW 37 k
8,200.0
8,200.0
05:43
05:52
11/172018
11/172018
0.45
PRODS
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,782 psi, Diff --239
8,200.0
8,300.0
05:52
06:19
psi, WHP=323, BHP=3,754, IA=695,
OA=688
11/17/2018
72018
0.30
PRODS
DRILL
WPRT
P
800' wiper up hole, PUW 37 k
8,300.0
7,500.0
06:19
06 7
06:3
11/17/2018
11/172018
0.20
PRODS
DRILL
WPRT
P
Wiper back in hole, RIW 11 k
7,500.0
8,300.0
06:37
06:49
11/17/2018
11/17/2018
0.65
PRODS
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,815 psi, Diff -368
8,300.0
8,400.0
06:49
07:28
psi, WHP=323, BHP=3,754, IA=695,
OA=688
11/17/2618
11/17/2018
0.15
PRODS
DRILL
WPRT
P
1 00'wiper up hole PUW 3Tk
8,400.0
8,400.0
07:28
07:37
11/17/2018
11/1712018
0.65
PROD3
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,815 psi, Diff -368
8,400.0
8,500.0
07:37
08:16
psi, WHP=323, BHP=3,754, IA=695,
OA=688
/2018
11/178:16
11/17/2018
0.15
FROD3
DRILL
WPRT
P
100' wiper up hole PUW 37 k
8,500.0
8,500.0
0
08:25
11/17/2018
11117/2018.
0.60
PRODS
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,815 psi, Diff=368
8,500.0
8,665.0
08:25
09:13
psi, WHP=323, BHP=3,754, IA=695,
OA=688
Page 34139 ReportPrinted: 11/2 012 01 8
Aerations Summary (with Timelog . .pths)
3H-13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log.
SleaTitre
rsrtlTire
DurlM
P6ese
2ECode
/ufivHyCetle
TimeRT-X
Operatlm
Steri Depth
(100),
End Depth (110)
11/17/2018
11/17/2018
0.75
PROD3
DRILL
WPRT
P
Wiper up hole inside pipe, w/5x5
8,665.0
7,315.0
09:13
09:58
sweep
11/17/2018
11/17/2018
0.60
PRODS
DRILL
WPRT
P
Continue pulling up hole, chasing 5x5
7,315.0
7,090.0
09:58
10:34
sweep, pump bottoms up.
11/17/2018
11/17/2018
0.20
PRODS
DRILL
DLOG
P
Log the K1 marker correction of (+05)
7,090.0
7,120.0
10:34
10:46
11/17/2018
11/17/2018
0.25
PRODS
DRILL
WPRT
P
RIH, perform static pressure survey
7,120.0
7,302.0
10:46
11:01
above window @ 7,302', close choke
in 11.8 ppg, shut pump down, monitor
annular pressure, 11.6 ppg,
11/17/2018
11/17/2018
0.40
PRODS
DRILL
WPRT
P
Continue wiper back in hole. RIW 11
7,302.0
8,665.0
11:01
11:25
k
11/17/2018
11/17/2018
0.70
PROD3
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,815 psi,
8,665.0
8,765.0
11:25
12:07
Diff--1,039 psi, WHP=253,
BHP=3,781, IA=697, OA=688
11/17/2018
11/17/2018
0.15
PRO53
DRILL
WPRT
P
100' wiper up hole POW 37 k
8,765.0
8,765.0
12:07
12:16
11/17/2018
11/17/2018
1.00
PROD3
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,877 psi,
8,765.0
8,866.0
12:16
13:16
Diff-1,119 psi, WHP=222,
BHP=3,809, IA=701, OA=710
11/171201811/17/2018
0.15
PROD3
DRILL
WPRT
P
100' wiper up hole POW 37 k
8,866.0
8,866.0
13:16
13:25
11/17/2018
11/17/2018
1.00
PRODS
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,877 psi,
8,866.0
8,985.0
13:25
14:25
Diff=1,119 psi, WHP=222,
BHP=3,809, IA=701, OA=710
11/17/2018
11/17/2018
0.15
PROD3
DRILL
WPRT
P
100' wiper up hole POW 37 k
8,985.0
8,985.0
14:25
14:34
-
11/17/2018
11/17/2018
1.00
PROD3
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,877 psi,
8,965.0
9,065.0
14:34
15:34
Dift=1,119 psi, WHP=222,
BHP=3,809, IA=701, OA=710
11/17/2018
11/17/2010
0.35
PRODS
DRILL
WPRT
P
800', wiper up hole, PUW 37 k
9,065.0
8,265.0
15:34
15:55
11/17/2018
11/17/2018
0.35
-PROD3
DRILL
WPRT
P
Wiper back in hole, RIW 15 k
8,265.0
9,065.0
15:55
16:16
11/17/2018
11/17/2018
1.74
PRODS
DRILL
DRLG
P
BOBD, 1.9 bpm at 4,877 psi,
9,065.0
9,216.0
16:16
18:00
Diff=1,119 psi, WHP=222,
BHP=3,809, IA=701, OA=710
11/17/2018
11/17/2018
2.00
PROD3
D ILL
DRLG
P
Crew change, BOBD, CWT =3.8K, FS
9,216.0
9,470.0
18:00
20:00
= 1098 psi @ 1.9 bpm, circ = 5220 psi,
BHP = 3818 psi (11.8 EMW @
window), pump 5x5 sweeps
11/17/2018
11/17/2018
1.50
PRODS
DRILL
WPRT
P
Wiper to window, PUW=37K, MAD
9,470.0
7,300.0
20:00
21:30
pass 7500'-7320'@ 5 fpm (for
resistivity)
11/17/2018
11/17/2018
0.50
PRODS
DRILL
DLOG
P
Obtain SBHP
7,300.0
7,300.0
21:30
22:00
Trap 11.87 ppg EMW (3,666 psi), MD
= 7300', TVD-sensor = 5939.4', allow
to drop to 3620' psi, bleed to 3602
psi, built back up to 3618 psi (EMW =
11.72 ppg)
' Seat mud pump #2 (Nabors 112 hour
per tour used)
11/17/2018
11/17/2018
0.30
PRODS
DRILL
DLOG
P
Log RA for +2'correction
7,300.0
7,357.0
22:00
22:18
11/17/2018
11/17/2018
0.70
PROD3
DRILL
TRIP
P
TD called, RBIH, confirm TD at 9470'
7,357.0
9,470.0
22:18
23:00
11/17/2018
11/18/2018
0.99
PRODS
DRILL
WPRT
P
Wiper to swab, PUW=37K
9,470.0
7,630.0
23:00
00:00
11/18/2018
11/18/2018
PROD1
7,630.0
00:00
00:00
Page 35139 ReportPrinted: 1112012018
-perations Summary (with Timelog _ .pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stettnme
Endrin
Di
%use
Op Code
Ac Ay cede
rine P -T-%
OpaaYon
Slam Depth
(MM)
Ed Depth (Po(B)
11/18/2018
11/18/2018
1.80
PRODS
DRILL
WPRT
P
Continue wiper to swab
7,630.0
78.0
00:00
01:48
11/18/2018
11/18/2018
1.30
PRODS
DRILL
WPRT
P
RBIH
78.0
7,090.0
01:48
03:06
11/18/2018
11/18/2018
0.20
PROD3
DRILL
DLOG
P
Log Kt for -7' correction
7,090.0
7,124.0
03:06
03:18
11/18/2018
11/18/2018
0.10
PRODS
DRILL
WPRT
P
Continue RIH to 7300'
7,124.0
7,300.0
03:18
03:24
11/18/2018
11/18/2018
0.20
PRODS
DRILL
DLOG
P
SBHP: bleed to 3599 psi, MD bit =
7,300.0
7,300.0
03:24
03:36
1
7300', TVD_ sensor=5939',-15 min
BHP at 3611 psi, 11.7 ppg EMW
11/18/2018
11/18/2018
0.90
PRODS
DRILL
WPRT
P
Continue RIH, RIW = 13K, confirm TD
7,300.0
9,473.0
03:36
04:30
at 9,473'
11/18/2018
11/182018
1.15
PROD3
DRILL
TRIP
P
POOH, laying in 12.0 ppg beaded
9,473.0
7,315.0
04:30
05:39
LRP up to the window
11/182018
11/18/2018
0.90
PRODS
DRILL
TRIP
P
Continue POOH, displacing well to
7,315.0
6,645.0
05:39
06:33
12.0 ppg completion fluid.
11/18/2018
11118/2018
0.20
PRODS
DRILL
TRIP
P
Perform flow check before pulling to
6,645.0
6,645.0
06:33
06:45
surface (no -flow)
11/18/2018
11/18/2018
1.25
PRODS
DRILL
TRIP
P
Continue POOH
6,845.0
78.3
06:45
08:00
11/182018
11/182018
0.50
PRODS
DRILL
PULD
P
At surface, check well for flow (no-
78.3
78.3
08:00
08:30
flow)
`"' Note: 8 bph loss rate
11/18/2018
11/18/2018
0.50
PRODS
DRILL
PULD
P
LD Drilling BHA on a dead well.
78.3
0.0
08:30
09:00
11/18/2018
11/18/2018
0.50
PRODS
CASING
PUTB
P
Prep RF for liner ops
0.0
0.0
09:00
09:30
11/182018
11/182018
2.75
PROD3
CASING
PUTB
P
PU/MU 55 jts of slotted 2-3/8" liner,
0.0
1,750.7
09:30
12:15
MU Liner Top Billet, and non -parted
bullnose.
11/18/2018
11/18/2018
0.50
PRODS
CASING
PUTB
P
RD liner running equipment
1,750.7
1,750.7
12:15
12:45
11/18/2018
11/18/2018
0.75
PRODS
CASING
PULD
P
PU/MU Coiltrak tools with blind sub,
1,750.7
1,795.3 .
12:45
13:30
slide cart forward, replace checks in
the upper quick, check pac-offs
(Change -out)
11/18/2018
11/18/2018
1.00
PRODS
CASING
RUNL
P
Tag up, reset counters, RIH
1.,795.3
7,202.0
13:30
14:30
11/18/2018
11/18/2018
0.15
PROD3
CASING
RUNL
P
Correct to EOP (-7.64'), PUN/ 37 k
7,202.0
7,196.4
14:30
14:39
11/16/2018
11/18/2016
0.50
PROD3
CASING
RUNL
P
Continue IH
7,196.4
9,078.0
14:39
15:09
11/18/2018
11/18/2018
0.45
PRODS
CASING
RUNL
P
Set down @ 9,078', PUW 39k,
9,078.0
9,473.0
15:09
15:36
continue to work pipe IH, continued
RIH clean from 9, 108'to bottom.
11/18/2018
11/182018
0.15
PRODS
CASING
RUNL
P
Bring pump up 1.5 bpm, PUW 32
9,473.0
9,473.0
15:36
15:45
11/18/2018
11/18/2018
1.15
PRODS
CASING
TRIP
P
Pumping across the top, remove liner
9,473.0
44.2
15:45
16:54
length from counters, POOH
11/18/2018
11/18/2018
0.60
PROD3
CASING
PULD
P
Check well for flow, PJSM, LD setting
44.2
0.0
16:54
17:30
tools on a dead well
11/18/2018
11/182018
1.20
PROD4
STK
PULD
P
PU BHA#30 KO/Drill Assembly
0.0
78.0
17:30
18:42
(Agitator, 0.7" AKO, RB P104 bit),
slide in cart, check pack -offs, good,
MU to coil, tag up, set counters
11/18/2018
11/18/2018
1.30
PROD4
STK
TRIP
P
RIH w/BHA #30, shallow test tools,
78.0
7,090.0
18:42
20:00
good
11/18/2018
11/182018
0.20
PROD4
STK
DLOG
P
Log Kt for-8correction
7,090.0
7,120.0
20:00
20:12
Page 36139 Report Printed: 1112 012 01 8
Aerations Summary (with Timelog , pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
rime Log
Smtl inns
EIM Tone
Dir(Or)
Pham
op Cope
AcU*Cope
Time P.T-x
oWaUW
am Npm
(01(3)
EM Depth dWB)
11/18/2018
11/18/2018
1.20
PROD4
STK
DISP
P
Displace to PowerPro, PUW = 31K
7,120.0
7,300.0
20:12
21:24
11/18/2018
11/18/2018
0.80
PROD4
STK
DLOG
P
Continue RIH, MAD pass fro 7550' up
7,300.0
7,550.5-
21:24
22:12
to 7350'
11/18/2018
11/1812018
0.40
PROD4
STK
TRIP
P
RIH, dry tag TOB @ 7720', PUW =
7,550.0
7,719.8
22:12
22:36
35K, bring up rate, RBIH, begin milling
@ 7719.6, PU to adjust TF
11/18/2018
11/18/2018
0.90
PROD4
STK
KOST
P
Milling 1 fph for 1 ft, FS = 1080 psi @
7,719.8
7,720.8
22:36
23:30
1.87 bpm, BHP = 3721 psi, WHP =
215 psi, circ = 5097 psi
11/18/2018
11/1912018
0.50
PROD4
STK
KOST
P
Go to 2 fph for 1 ft
7,720.8
7,721.8
23:30
00:00
11/19/2018
11/1912018
0.30
PROD4
STK
KOST
P
Go to 3 fph for 1 ft, begin pushing on it
7,721.8
7,722.8
00:00
00:18
@ 3'in
11/19/2018
11/19/2018
0.60
PROD4
DRILL
DRLG
P
Drilling, 1.87 bpm, CWT= 14.3K,
7,722.8
7,800.0
00:18
00:54
WOB=.8K, BHP =3737 psi, WHIP=
207 psi, circ = 4964 psi, pump 5x5
sweeps, PUW = 38K
11/19/2018.
11/19/2018
0.10
PROD4
DRILL
WPRT
-F-
Drift billet area up & down, slight WOB
7,800.0
7,800.0
00:54
01:00
bobble at 7720' PUH
11/19/2018
11/19/2018
2.00
PROD4
DRILL
DRLG
P
Drilling, FS = 1100 psi @ 1.9 bpm,
7,800.0
7,963.0
01:00
03:00
CWT =I5K, WOB=1.7K, BHP=
3736 psi, WHIP = 202 psi, circ = 5190
psi, BHA wiper every 100', lower ROP
beginning @ 7954'
Holding 11.9 ppg for 1 -for -1, blow
down MM, come down to 11.8 ppg &
maintain 1 -for -1
11/19/2018
11/19/20181.00
PROD4
DRILL
DRLG
P
Drilling, 1.9 bpm, BHP= 3713 psi,
7,963.0
8,000.0
03:00
04:00
WHIP= 187 psi, circe = 5104 psi, dp =
1313 psi, drilling through higherAPI
interval w/ low ROP (-25 fph)
11/19/2018
11/19/2018
0.10
PROD4
DRILL
WPRT
P
100 ft Wiper, PUW = 38K, RIW = 15K
8,000.0
8,000.0
04:00
04:08
11/19/2018
11/19/2018
2.70
PROD4
DRILL
DRLG
P
Drilling, FS = 1150 psi @ 1.9 bpm,
8,000.0
8,125.0
04:06
06:48
BHP = 3690 psi, WHIP = 163 psi, circ
= 5022 psi
11/19/2018
11/19/2018
0.30
PROD4
DRILL
WPRT
P
Wiper up hole to 7,400', PUW 40 k
8,125.0
7,400.0
06:48
07:06
11/19/2018
11/19/2018
0.30
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW 13.9 k
7,400.0
8,125.0
07:06
07:24
11/19/2018
11/19/2018
2.00
PROD4
DRILL
DRLG
P
BOBD, 1.9 bpm at 5,023 psi,
8,125.0
8,171.0
07:24
09:24
Diff --1,098 psi, WHP=236, IA=702,
OA=709
11/19/2018
11/19/2018
0.10
PROD4
DRILL
WPRT
p
200' wiper up hole, PUW 38 k
8,171.0
7,971.0
09:24
09:30
11/19/2018
11/19/2018
0.10
PROD4
DRILL
WPRT
P
Wiper back in hole, RIW 12.8 k
7,971.0
8,171.0
09:30
09:36
11/19/2018
11/19/2018
1.40
PROD4
DRILL
DRLG
P
BOBD, 1.9 bpm at 5,023 psi,
8,171.0
8,200.0
09:36
11:00
Diff --1,098 psi, WHP=236, IA=702,
OA=709
11/19/2018
11/1912618
0.20
PROD4
DRILL
WPRT
P
Wiper up hole to 7,909, PUW 39-k-
8,200.0
7,900.0
11:00
11:12
11/19/2018
11/1912018
0.20
PROD4
DRILL
WPRT
P
wiper back in hole, RIW 9.8 k
7,900.0
8,200.0
11:12
11:24
11/19/2016
11/19/2018
0.25
PROD4
DRILL
DRLG
P
BOBD, 1.9 bpm at 5,023 psi, Dift=984
8,200.0
8,210.0
11:24
11:39
psi, WHP=336, IA=702, OA=709
11/19/2018
11/19/2018
0.60
PROD4
DRILL
WPRT
P
Wiper up hole to above window, PUW
8,210.0
7,090.0
11:39
12:15
38 k
11/19/2018
11/19/2018
0.20
PROD4
DRILL
DLOG
P
Log the K1 marker correction plus 1.0'
7,090.0
7,126.0
12:15
12:27
Page 37139 Report Printed: 11/20/2018
perations Summary (with Timelog - _pths)
3H -13A
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Time
6q Tbrre
D' (h')
Ruse
Op Cafe
Aati�rily Catle
11me P -T -X
Ope2don
SM DepthSial
lrn�
End Depth lN®)
11/19/2018
11/19/2018
0.50
PROD4
DRILL
WPRT
P
With bottoms up, RIH RIW 14.7 k
7,126.0
8,210.0
12:27
12:57
'"' Note: Set down 8,165'
11/19/2018
11/19/2018
1.25
PROD4
DRILL
DRLG
P
BOBD, 1.9 bpm at 5,023 psi, Diff -984
8,210.0
8,243.0
12:57
14:12
psi, WHP=336, IA=702, OA=709
11/19/2018
11/19/2018
0.25
PROD4
DRILL
WPRT
P
Wiper to the billet, PUW 37 k
8,243.0
7,740.0
14:12
14:27
Note: Called TO early do to hole
conditions/150API
11/19/2018
11/19/2018
0.40
PROD4
DRILL
WPRT
P
RBIH to 7,950', RIW 13.3 k
7,740.0
7,950.0
14:27
14:51
11/19/2018
11/19/2018
2.00
PROD4
DRILL
WPRT
P
POOH chasing sweeps, performing
7,950.0
78.3
14:51
16:51
jogs @ 5,200', 3,200', and 517'
11/19/2018
11/1912018
1.15
PROD4
DRILL
TRIP
P
Tag up, reset counter depths, RIH
78.3
7,090.0
16:51
18:00
11/19/2018
11/19/2018
0.15
PROD4
DRILL
DLOG
P
Log the K1 correction of minus 8.0'
7,090.0
7,126.0
18:00
18:09
11/19/2018
11/19/2018
0.15
PROD4
DRILL
CLOG
P
Perform Static Pressure Survey @
7,126.0
7,300.0
18:09
18:18
7,300', 5,939' (TVD), 3,632 psi (11.76
ppg)
11/19/2018
11/19/2018
0.55
PROD4
DRILL
TRIP
P
Continue IH off bottom @ 7,950', PUW
7,300.0
7,950.0
18:18
18:51
34 k
11/19/2018
11/19/2018
1.00
PROD4
DRILL
TRIP
P
POOH, laying in 12.0 ppg beaded liner
7,950.0
5,500.0
18:51
19:51
running pill up into cased hole, 5,500',
Painting EDP flags TD and above
window
11/19/2018
11/19/2018
1.00
PROD4
DRILL
TRIP
P
Continue POOH, displacing well to
5,500.0
78.3
19:51
20:51
12.0 ppg completion fluid
11/19/2018
11/1912018
0.50
PROD4
DRILL
PULD
P
At surface, check well for Flow, PJSM
78.3
78.3
20:51
21:21
11/19/2018
11/19/2018
0.55
PROD4
DRILL
PULD
P
LD drilling BHA on a dead well
78.3
0.0
21:21
21:54
11/19/2018
11/19/2018
0.45
PROD4
CASING
PUTB
P
Prep rig floor for liner ops, PJSM
0.0
0.0
21:54
22:21
11/19/2018
11/19/2018
1.15
COMM
CASING
PUTB
P
MU AL1 -03 liner segment 22 its,
0.0
685.0
22:21
23:30
shorty deployment sleeve, and non -
ported bullnose.
11/19/2018
11/20/2018
0.50
COMPZ4
CASING
PULD
P
Begins PU Liner running tools BHA
685.0
685.0
23:30
00:00
#31
11/20/2018
11/20/2018
0.30
COMPZ4
CASING
PULD
P
Complete PU Liner running tools BHA
685.0
730.0
00:00
00:18
#31, slide in cart, change out checks,
MU to coil, tag up, set counters
11/20/2018
11/20/2018
2.90
COMPZ4
CASING
RUNL
P
RIHw/BHA#31,-6.13'correction to
730.0
7,944.0
00:18
03:12
window flag, PUW = 35K, continue
RIH to 7944', PUW = 40, RBIH, bring
up pumps 1.55 bpm (dp = 1000 psi),
release off liner, PUW = 34K, BOM =
7944', TOL- 7258'
11/20/2018
11/20/2018
0.30
C0MPZ4
EASING
CLOG
P
Obtain SBHP (15 min): MD = 7243.6',
7,944.0
7,224.0
03:12
03:30
TVD sensor= 5927.3', Annular=
3667 psi, EMW = 11.91 ppg
Note: EMW = 11.76 ppg on last SBHP
wl9 ppg PowerPro in the well
11/20/2018
11/2012018
2.00
COMPZ4
CASING
DISP
P
Open EDC, displace well to seawater,
7,234.0
2,500.0
03:30
05:30
POOH
11/20/2018
11/2012618
1.70
COMPZ4
CASING
FRZP
P
Ffreeze protect from 2500'to surface,
2,500.0
44.0
05:30
07:12
POOH
11120/2018
11/20/2018
1.30
COMPZ4CASING
PULD
P
PJSM, PUD & LD BHA#31
44.0
0.0
07:12
08:30
"SITP = 1180 psi, IA= 670 psi, OA=
482 psi
Page 38139 Report Printed: 1112 012 01 8
perations Summary (with Timelog pths)
3H-13A
Rig: NABORS CDR3-AC
Job: DRILLING SIDETRACK
Time Log
Sfarlrma
FiW rme
o�0ej
Phase
oP code
Asti yCode
Thier-Tx
ocean
sed oepm
MKS)
6a DeO (ram)
11/20/2018
11/20/2018
1.50
DEMOB
WHDBOP
RURD
P
Clear rig floor, MU nozzle, stab on,
0.0
0.0
08:30
10:00
flush stack, pop off, break-off nozzle,
blow down surface lines, clear floor,
Working RD checklist.
11/20/2018
11/20/2018
1.o0
DEMOB
WHDBOP
RURD
P
Remove UQC checks, work RD
0.0
0.0
10:00
11:00
checklist, vac out stack, freeze protect
tree
11/20/2018
11/20/2018
1.00
DEMOB
WHDBOP
NUND
P
ND BOP
0.0
0.0
11:00
12:00
Rig Released: 11/20 12:00 hrs
Page 39139
Report Printed:
11120/2018
�-I
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 3H Pad
3H-13AL1-02
50-103-20089-62
Baker Hughes INTEQ
Definitive Survey Report
07 December, 2018
BA,(ER 01
UGHES
a GE company
ConocoPhillips 6A RHES
ConocoPhilli s Definitive Survey Report G
i
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Local Co-ordinate Reference:
Well 31-1-13
Project:
Kuparuk River Unit
TVD Reference:
311-13A @ 71.00usft (31-1-13A)
Site:
Kuparuk 3H Pad
MD Reference:
3H -13A @ 71.00usft (3H -13A)
Well:
3H-13
North Reference.
True
Wellbore:
3H-13AL11-02
Survey Calculation
Method.
Minimum Curvature
Design:
3H-13AL1-02
Database:
EDT 14 Alaska Production
Project
Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS)
Using Well Reference
Point
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Well
3H-13
Well Position
+N/S 0.00 usft
Northing:
6,000,475.46usft
Latitude:
70° 24'45,119 N
+E/ -W 0.00 usft
Easting:
498,655.42usft
Longitude:
150° 0'39.419 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
usft
Ground Level:
0.00 usft
Wellbore
3H-13AL1-02
Magnetics
Model Name Sample Date
Declination
Dip Angle
Field Strength
0
0
(nn
BGGM2018 11/1/2018
16.83
80.91
57,435
Design
3H-13AL1-02
Audit Notes:
Version:
1.0 Phase: ACTUAL
Tie On Depth:
7.456.57
Vertical Section:
Depth From (TVD)
+N/ -S
-E/-W Direction
(usft)
(usft)
(usft) (•)
71.00
0.00
0.00 0.00
17/7/2018 3A5'02PM Page 2 COMPASS 5000 14 Build 85D
�. ConocoPhillips B"ucHe ri
ConocoPhilli s T
p Definitive Survey Report
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Local Coordinate Reference:
Well 31-1-13
Project :
Kupanuk River Unit
Map
ND Reference:
3H -13A @ 71.00usft (3H -13A)
Vertical
Site
Kuparuk 3H Pad
Inc
MD Reference:
3H -13A @ 71.00usft (3H -13A)
NDSB
Well:
3H-13
North Reference:
True
Wellbore:
3H-13AL7-02
Survey Calculation Method:
Minimum Curvature
Design:
3H-13AL1-02
Northing
Database:
EDT 14 Alaska Production
Section
Survey Program
(usft)
Date
V)
(usft)
(usft)
From
To
IN)
(ft)
(°1100.)
Survey
(usft)
(waft)
Survey (Wellbore)
Tool Name
Description
Start Date
95.00
5,900.00
31-1-13 (3H-13)
GCT -MS
Schlumberger GCT multishot
1/12/2001
6.113.56
7,260.49
3H-13AATDB(311-13A)
MWD
MWD - Standard
9/18/2001
7,315.00
7,396.26
3H-13AL1PB3 MWD-INC(3H-13AL1PB3
MWD-INC_ONLY
MWD -INC -ONLY -FILLER
11/11/2018
7,426.34
7,456.57
3H-13AL1PB3 MWD(3H-13AL1PB3)
MWD
MWD -Standard
11/11/2018
7,462.00
7,495.22
31-1-13AL1-02 MWD-INC(3H-13AL1-02)
MWD -INC ONLY
MWD -INC -ONLY -FILLER
11/16/2018
7,525.98
9,428.65
3H-13AL1-02 MWD (3H-13AL1-02)
MWD
MWD -Standard
11/16/2018
Survey
Survey
End Data
11/11/2018
11/13/2018
11/16/2018
11/17/2018
Annotation
TIP
KOP
Interpolated Azimuth
1217/2016 3:45r02PM Page 3 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
AidTVD
NDSB
+WS
+E/ -W
DLS
Northing
EasNng
Section
Survey Tool Name
(usft)
V)
V)
(usft)
(usft)
(usft)
(usft)
IN)
(ft)
(°1100.)
(ft)
7,45657
9]82
46.59
5.992.74
-5,921.74
3,128.36
73731
6,003,603.64
497.918.75
49.04
3,12836
MWD (4)
7.462.00
97.35
49.21
5,99203
-5,921.03
3,131.97
-733.32
6,003,607.24
497,922,74
48.60
3,131.97
MWD -INC -ONLY (5)
7,495.22
95.93
47.00
5,968.19
5,917.19
3.154.00
408.76
6,003,62927
497,947.30
7.87
3.154.00
MWD -INC _ONLY (5)
7,525.98
93.47
46.89
5,985.67
-5,914.67
3.174.93
4gi6.36
6,003,650.19
497,969.70
8.01
3,174.93
MWD (6)
7,556.52
91.87
47,54
5,98424
-5,91324
3,195.65
-663.97
6,003.670.91
497,992.09
5.65
3,195.65
MWD (6)
7,591.18
8868
46.00
5,984.08
-5,913.08
3,219.38
63872
6003.694.64
498.017.34
10.22
3,219.38
MWD (6)
7,62226
8840
4496
5,984.87
-5,913.87
3,241.17
-61857
6,003,71841
498,039.50
3.46
3,241.17
MWD (6)
7,650.54
87.39
43.19
5,985.91
-5,914.91
3,261.47
-596,91
6.003.736.71
498.059.16
7.20
3,26147
MWD l6)
7,682.51
86.74
43.57
5,987.54
-5,916.54
3.284.68
574.98
6,003,759.91
498,081.09
2.35
3,28488
MWD (6)
7,712.59
86.56
44.07
5,989.30
-5,918.30
3.306.34
-554.19
6,003,781.57
498,101.88
1.76
3,306.34
MWD(6)
7,740.36
65.91
42.17
5,991.13
-5,920.13
3,326.57
-53525
6,003,801.79
498.120.82
7.22
3,326.57
MWD (6)
7,770.82
86.56
41.02
5.993.13
-5,922.13
3,349.30
-515.07
6,003,824.51
498.141.00
4.33
3.349.30
MWD (6)
7,800.89
85.27
40.52
5,995.27
-5,924.27
3.372.01
495.49
6,003,84122
498,160.59
4.60
3,37201
MWD(6)
7,83085
84.55
39.21
5,997,93
-5,926.93
3.394.92
476.36
6,003,870.12
498.179.72
4.97
3,39492
MWD (6)
7,86030
83.25
37.15
6,001.06
-5,930.06
3.417.93
458.26
6,003,893.13
498,197.82
8.24
3,417.93
MWD (6)
7,891.33
85.17
35.97
6,004.19
-5,933.19
3,44273
439.87
6.003.917.92
498.216.21
7.25
3,442.73
MWD(6)
7,92044
87.14
35.48
8,006.14
-5,935.14
3,466.31
422.91
6,003.941.50
498.233.17
6.W
3,466.31
MWD(6)
Survey
End Data
11/11/2018
11/13/2018
11/16/2018
11/17/2018
Annotation
TIP
KOP
Interpolated Azimuth
1217/2016 3:45r02PM Page 3 COMPASS 5000.14 Build 85D
Survey
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips (Alaska) Inc. -Kup2
Local Coordinate Reference:
Well 31-1-13
Project: Kuparuk River Unit
TVD Reference:
31-1-13A @ 71.00usft (31-1-13A)
Site: Kupamk 3H Pao
MD Reference:
31-1-13A @ 71.00usft (3H -13A)
Well: 31-1-13
North Reference:
True
Wellbore: 31-1-13AL1-02
Survey Calculation Method:
Minimum Curvature
Design: 3H-13AL1-02
Database:
EDT 14 Alaska Production
Survey
12/712018 3'45:02PM Page 4 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
Azl
TVD
TVDSS
+N/-S+FJ-W
DLS
(ustt)
(°)
(°)
(ustt)
(ustt)
Wait)
(usft)
Northing
Easting
Section
Survey Tool Name Annotation
(ft)
(ft)
IN)
7.951.34
89,08
34,31
6,007.16
-5.93616
3.49164
405.25
6,003.966.82
498.250.84
783
3,491.64
MWD (6)
7,980.51
89.63
33.63
6.007.49
-5,936.49
3,515.83
-388.95
6003,991.00
498,267.14
3.00
3,515.83
MWD (6)
8,011.23
91 Al
3208
6,00T21
-5,936.21
3,541.63
-372.29
6,004,016.80
498,283.81
7.68
3,541.63
MWD(6)
8,04150
93.66
31.26
6,005.87
-5,93087
3.567.36
356.41
6,000.042.53
498.299.69
T.91
3,567.36
MWD (6)
8,071.13
93.72
29.38
6.003.96
-5,93296
3,59289
-341.48
6,004.06805
498314.62
6.34
3,592.89
MWD (6)
8,10192
94.09
28.60
6,001.86
-5,930.86
3.619.76
-326.60
6,004,09491
498.329.51
2.80
3,619.76
MWD(6)
8,13078
94.06
28.34
5,999.81
-5,928.81
3,645.30
-313.32
6,004,120.45
498,342.79
7.81
3.645.30
MWD (6)
8.162.12
93.47
24.12
5,997.76
-5,926,76
3,673.58
-299.99
6,004,148.73
498,356.12
781
3.673.58
MWD (6)
8,19155
91.50
21.18
5.996.48
-5,925.48
3,70051
-28867
6,004,17586
498,36745
12.02
3,700.71
MWD (6)
8,220.67
91.26
21.30
5.995.78
-5,924.78
3,72785
-278.12
6,004,202.98
498,378.00
0.92
3,727,85
MWD (6)
8,25029
90.89
20.13
5,995.22
-5,924.22
3,75555
-26765
6.004,23068
498.388.48
4.14
3,755.55
MWD (6)
8,281.14
89.69
17.88
5,995,07
-5,924.07
3,784.71
-257.60
6,004,259.84
498,398.53
8.27
3,78071
MWD (6)
8,310.76
88.92
15.38
5,995.43
-5,924.43
3,813.09
-249.13
6,004,28821
498,407.01
8.83
3,813.09
MWD (6)
8,341.04
90.09
13.63
5,995.69
-5,924.69
3,84240
-24154
6,004,317.52
498,414.59
6.95
3,842.40
MWD (6)
8,371.07
92.03
12.98
5,995.13
-5,924.13
3,871.62
.234.63
6,004,346.73
498,421.51
6.81
3,871.62
MWD (6)
8,400.94
93.96
11.37
5,993.57
-5.922.57
3,900.77
-228.34
6,004,375.89
498,427.80
8.41
3,900.77
MWD (6)
8,430.82
94.18
10.19
5,99145
-5,920.45
3,930.05
-222.77
6,004,405.16
498,433.38
401
3,930.05
MWD (6)
8.460.77
94.30
8.88
5,989.24
-5,916.24
3,959.51
-217.82
6,004634.61
498,438.33
4.38
3,959.51
MWD (6)
8,490.65
93,84
7.50
5,987.11
-5,916.11
3,989.01
-213.57
6,004,464.11
498,42.59
4.86
3,989.01
MWD (6)
8,520.82
93.04
6.31
5,985.30
-5,91430
4,018.90
-209.95
6,004.494.00
498.446.21
475
4,018.90
MWD (6)
8,551.02
93.04
5.03
5,983.70
-5,91270
4,048.91
-206.97
6,004.524.01
498,449.20
4.23
4,046.91
MWD (6)
8,581.60
92.70
3.89
5,982.17
-5,911.17
4,079.36
-204.60
6,004,55945
498.451.58
3.89
4,079.36
MWD (6)
8,612.14
91.78
0.40
5,980.98
-5.909.98
4,109.85
-20346
6,004,584.94
498,452.72
11.81
4,109.85
MWD (6)
8,640.33
91.04
358,90
5.980.28
-5,909.28
4,138.03
-203.63
6,004,613.11
498,452.56
5.93
4,138.03
MWD (6)
8,671.18
88.19
354.48
5,98049
-5,909.49
4,16882
-205.41
6,004,643.90
49645078
17.05
4,168.82
MWD (6)
8,70053
8748
351.43
5,981.60
-5,910.60
4,197.92
-209.01
6,004,673.00
496447.19
1066
4,197.92
MWD (6)
8,731.00
88.86
350.81
5,982,57
-5,911.57
4.228.01
-213.71
6,004,703.09
498.44249
4.96
4,228.01
MWD (6)
8765.77
87.45
349.05
5,983.69
-5,912.69
4,26223
-219.78
6,004.737.30
496436.43
6.48
4,262.23
MWD (6)
8.791.14
86.58
34776
5.985.01
-5,914.01
4,287.04
-224.88
6,004,762.12
498,431.34
6.13
4,28704
MWD (6)
8.822.81
87.26
34587
5.98672
-5.915.72
4.317.83
-232.09
6,004,792.90
498,424.13
6.33
4,317.83
MWD (6)
8.851 A3
8677
34362
5.988.21
-5.91721
434540
-239.61
6,004,820.47
498,41662
8.04
4345.40
MWD(6)
12/712018 3'45:02PM Page 4 COMPASS 5000.14 Build 85D
ConocoPhillips SA ER ES 0
ConocoPhilli 5 UGH
p Definitive Survey Report -
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Local Co-ordinate Reference:
Well 3HA3
Project:
Kuparuk River Unit
TVD Reference:
3H -13A @ 71.00usft (3H -13A)
Site
Kuparuk 3H Pad
MD Reference:
3H -13A @ 71.00usft (3HA 3A)
Well:
31-1-13
North Reference:
True
Wellbore:
3HA21AL1-02
Survey Calculation Method:
Minimum Curvature
Design:
31-1-13AL1-02
Database:
EDT 14 Alaska Production
Survey
12/7/2018 3:45:02PM Page 5 COMPASS 5000 14 Build 85D
Map
Map
Vertical
Inc
Azi
TVD
TVDSS
-N/-S
+E1 -W
DLS
-
(usft)
Wait)
(°)
(')
(usft)
(usft)
(usft)
usft)
Northing
Ea sting
(°1100'
Section
Survey Tool Name Annotation
8,880.17
86.19
342.07
5,989.47
-5,91847
4.37284
-248.08
6,004,847.91
496408.16
7.31
4,372.84
MWD (5)
8.911.19
8932
339.47
5,990.14
-5,919.14
4.402.12
-258.29
6,004,877,18
498,39795
9.14
4,402.12
MWD (6)
8.941.94
88.40
33805
5,990.76
5,91976
4.430.77
-269.43
6,004,905.84
498,38682
5.50
4,430.77
MWD (6)
8.972.18
89.39
339.22
5,991.34
-5,920.34
4458.93
-280.44
6,004,933,99
498.37581
5.07
4,456.93
MWD (6)
9,000.11
90.00
341.68
5,991.49
5,920.49
4,48525
-289.79
6,004,960.31
498,366.47
9.07
4,48525
MWD (6)
9,029.64
90.95
342.07
5,991.24
-5,920.24
4.513.31
-298.97
6,004,988.37
498.35129
3.48
4,513.31
MWD (6)
9,061.02
92.21
34034
5,990.38
-5.91938
4.54300
-309.08
6,005,018.06
498.347.19
6.82
4,543.00
MWD (6)
9,090.54
92,83
339.87
5.989.08
-5,916.08
4,570.73
-319.11
6,005,045.79
498.337.16
2.63
4,570.73
MWD (6)
9,120.62
93.81
339.51
5,987,34
-5,916.34
4.598.90
-329.54
6,005,073.95
498.326.74
347
4,598.90
MWD (5)
9,150.05
90.25
340.83
5,986.30
-5,91530
4,626.56
-339.51
6,005,101,62
498.316.77
12.90
4,628.56
MWD (6)
9,17767
8969
339.71
5,986.31
-5,915.31
4,652.46
-348.80
6,005,127.52
498,307.49
4.55
4,652.46
MWD(6)
9,210.69
89.29
341.32
5,98660
-5.915.60
4,683.68
-359.85
6,005,158.74
498,296.45
5.01
4,68368
MWD (6)
9,243.60
87.20
341,81
5,987.61
-5,916.61
4.714.89
-370.25
6,005,189.94
498.286.05
6.52
4.714.89
MWD (6)
9,270.46
8732
342.63
5.98890
-5,917.90
4,740.44
-378.44
6,005,215.49
498,2778T
308
4,740.44
MWD (6)
9,301.22
8600
343.39
5,990.15
5,919.15
4.769.83
-38742
6,005,244.88
498,268.89
3.31
4,769.83
MWD (6t
9,330.49
87.61
343.48
5,991.27
-5,92027
4,797.86
-395.76
6,005,272.91
498,260.56
1.37
4,797.86
MWO(6)
9,360.56
86.28
34.76
5,992.88
-5,921.86
4,826.74
403.98
6,005,301.79
498,252.35
6.13
4,826.74
MWD (6) 1
9,395.63
8702
346.79
5,994.93
-5,923.93
4,860,68
412.58
6,005,335.72
498.24375
6.15
4,860.68
MWD (6)
9,428.65
8846
349.02
5,996.23
-5,925.23
4,892.94
419.49
6,005,367.98
498.23685
8.03
4,892.94
MWD (6)
9673.00
88,46
349.02
5,997.42
-5,926.42
4,93646
427.94
6,005,411.60
498.228.41
0.00
4,936.46
PROJECTEDto TD
12/7/2018 3:45:02PM Page 5 COMPASS 5000 14 Build 85D
BAYUCHE PRINT DISTRIBUTION LIST
a GE company
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME 3H-13AL1-02
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT
Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider(o�bakerhughes.com
STATUS Final Replacement:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. 90X)
PERSON ATTENTION
V
1 RP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&G WO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Benson Blvd.
.Anchorage, Alaska 99508
2 ConocoPhillkps Alaska Inc.
Attn: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99510
3 F.xxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska -AOGCC
�Attn: Natural Resources Technician If
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR -Division of0d & Gas ***
Arta: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd
Anchorage, Alaska 99508
v_
21 8137
30115
a sign and return one copy of this transmittal form to:
coPhillips Alaska, Inc.
Osterkamp (WNS Petroleum Technician)
i Street.
orage, Alaska 99510
data.
LOG TYPE GR - RES
LOG DATE November 19. 2018
TODAYS DATE December 11, 2018
Revision
Details:
Rev. Requested by: ---
FIELD/
FINAL
CD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRIN i
X Ur PRIN
# OF COPIES
# OF COPIES
I# OF COPIES
4 4
IX OGGG
P
0 0 0 10 0
0 1 1 1 1 1 0 p
0 1 0 1 1 1 0 0
0 1 0 1 1 0 0
TOTALS FOR THIS PAGE: 0 1 3 0 0
BT�aGEcompany ER
GHES
As
Date:
December 7, 2018
Abby Bell
AOGCC
333 West 7`^ Ave, Suite 100
Anchorage, Alaska 99501
218137
Letter of Transmittal
Michael Soper
Baker Hughes, a GE Company
795 East 94`^ Avenue
Anchorage, Alaska 99515
find enclosed the directional survey data for the following well(s):
3H-13AL1PB1
3H-13AL1PB2
3H-13AL1-01PB1
3H-13AL1PB3
3H-13AL1
3H-13AL1-02
3H-13AL1-03
(7) Total prints
DEC 10 2018
AOGCC
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Note: Please feel free to send us an email in place of return mail.
Michael Soper, Baker Hughes, Applications Engineer
Michael.SoperCa@BakerHuehes.com
ConocoPhillips
ConocoPhillips (Alaska) Inc. -Kup2
Kuparuk River Unit
Kuparuk 3H Pad
3H-13AL1-02
60-103-20089-62
Baker Hughes INTEQ
Definitive Survey Report
07 December, 2018
218137
30083
BA ER (�
F�UGHES
a GE company
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: Conocc Phillips(Alaska) Inc.-Kup2
Local Co-ordinate Reference:
Project: Kuparuk River Unit
TVD Reference:
Site: Kuparuk 3H Pad
MD Reference:
Well: 31-1-13
North Reference:
Wellbore: 31-1-13AL1-02
Survey Calculation Method:
Design: 31-1-13AL1-02
Database:
Well 3H-13
3H -13A @ 71.00usft (3H -13A)
3H -13A (off 71.O0usft (3H -13A)
True
Minimum Curvature
EDT 14 Alaska Production
Project
Kuparuk River Unit, North Slope Alaska, United Stales
j
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Mean Sea Level
Geo Datum:
NAD 1927 (NADCON CONUS)
Using Well Reference Point
Map Zone:
Alaska Zone 04
Using geodetic scale factor
Well
3H-13
Well Position
+N/ -S 0.00 usft
Northing:
6,000,475.46usft
Latitude:
y
70° 24'45.119 N f
+E/ -W 0.00 usft
Elating:
498,655.42usft
Longitude:
150" 0'39.419 W
Position Uncertainty
0.00 usft
Wellhead Elevation:
usft
Ground Level:
fI
0.00 usft #
Wellbore
3H-13AL1-02
_
t
Magnetics
Model Name Sample Date
Declination
Dip Angle
1
Field Strength
(1)
r)
(nn
BGGM2018 11/1/2018
16.83
80.91
57,435 I
--U
Design
3H-13ALL02
Audit Notes:
Version:
1.0 Phase: ACTUAL
Tie On Depth:
7,456.57
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
Direction
j
(usft)
(usft)
(usft)
(•)
1
d
71.00
0.00
0.00
0.00
I
12/72018 3:45:02PM Page 2 COMPASS 5000.14 Build 85D
ConocoPhillips RA ER
UGH
ConocoPhillips Definitive Survey Repo
S
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Local Coordinate Reference:
Well 3H-13
.�
Project:
Kuparuk River Unit
TVD Reference:
3H -13A @ 71.00usft (3H -13A)
Vertical
Site:
Kuparuk 3H Pad
MD Reference:
3H -13A @ 71.00usft (3H -13A)
TVD
j
Well:
31H-13
North Reference:
True
DLS
Section
Wellbore:
311-13AL1-02
Survey Calculation Method:
Minimum Curvature
(0)
(usR)
Design:
3H-13AL1-02
Database:
EDT 14 Alaska Production
(°1100')
Survey Program
Date
Annotation
From
To
Survey
Survey
(usR)
(usft) Survey (Wellbore)
Tool Name
Description
Start Date
End Date
95.00
5,900.00 31-1-13 (3H-13)
GCT -MS
Schlumberger GCT multishot
1/12/2001
6,003,60364
6,113.56
7,260.49 3H-13AATDB(3H-13A)
MWD
MWD -Standard
9/18/2001
7,462.00
7,315.00
7,396.26 3H-13AL1PB3 MWD-INC(3H-13AL1PB3
MWD -INC -ONLY
MWD -INC -ONLY -FILLER
11/11/2018
11/11/2018
7426.34
7,456.57 3H-13AL1PB3 MWD(3H-13ALIPB3)
MWD
MWD -Standard
11/11/2018
11/13/2018
7462.00
7,495.22 3H-13ALl-02 MWD-INC(3H-13AL1-02)
MWD-INC_ONLY
MWD -INC -ONLY -FILLER
11/16/2018
11/16/2018 j
7,525.98
9,428.65 3H-13AL1-02 MWD(3H-13AL1-02)
MWD
MWD - Standard
11/16/2018
11/17/2018 3Cp
Interpolated Azimuth
7,525.98
93.47
46.89
5,965.67
5,914.67
Survey
121712018 3:45:02PM Page 3 COMPASS 5000.14 Build 85D
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+EI -W
Northing
Seating
DLS
Section
Neff)
0
(0)
(usR)
Waft)
(usR)
(usR)
(°1100')
Survey Tool Name
Annotation
(ft)
(R)
(ft)
7,456.57
97.82
46.59
5,992.74
5,921.74
3,128.36
-737.31
6,003,60364
497,918.75
49.04
3,128.36
MV/D(4)
TIP
7,462.00
97.35
49.21
5,992.03
5,921.03
3,131.97
-733.32
6,003,607.24
497,922.74
48.60
3,131.97
MWD-INC_ONLY (5)
KOP
7,495.22
95.93
47.00
5,988.19
5,917.19
3,154.00
-708.76
6,003,62927
497,947.30
7.87
3,154.00
MWD -INC ONLY (5)
Interpolated Azimuth
7,525.98
93.47
46.89
5,965.67
5,914.67
3,174.93
686.36
6,003,650.19
497,969.70
8.01
3,174.93
MVID(6)
7,556.52
91.87
47.54
5,98424
-5,913.24
3,19565
663.97
6,003,670.91
497,992.09
5.65
3,195.65
MWD (6)
7,591.18
88.68
1600
5,964.08
5,913.08
3,219.38
638.72
6,003,694.64
498,017.34
10.22
3,219.38
MWD(6)
7,622.26
88.40
44.96
5,984.87
5,913.87
3,241.17
616.57
6,00$716.41
498,039.50
3.46
3,241.17
MWD(6)
7,650.54
87.39
43.19
5,985.91
5,914.91
3,261.47
-596.91
6,003,736.71
496,059.16
7.20
3,261.47
MWD (6)
7,682.51
86.74
43.57
5,987.54
-5,916.54
3,284.68
-574.98
6,003,759.91
498,081.09
2.35
3,28468
MWD (6)
7.712.59
86.56
44.07
5,989.30
-5,918.30
3,306.34
-554.19
6,003,781.57
498,101.86
1.76
3,306.34
MWD(6)
7,740.36
85.91
42.17
5,991.13
-5,920.13
3,326.57
535.25
6,003,801]9
498,120.82
7.22
3,326.57
MWD (6)
7,770.82
86.56
41.02
5,993.13
-5,922.13
3,349.30
515.07
6,003,824.51
498,141.00
4.33
3,349.30
MWD (6)
j 7,800.89
85.27
40.52
5,995.27
-5,924.27
3,372.01
495.49
6,003,847.22
498,160.59
4.60
3,372.01
MWD (6)
jy 7,830.85
84.55
39.21
5,997.93
-5,926.93
3,394.92
476.36
6,003,870.12
498,179.72
4.97
3,394.92
MWD (6)
7,850.30
83.25
37.15
6,001.06
-5,930.06
3,417.93
-458.26
6,003,893.13
498,19782
8.24
3,417.93
MWD(6)
7,891.33
85.17
35.97
6,004.19
-5,933.19
3,442.73
-039.87
6,003,917.92
498,216.21
7.25
3,442.73
MWD(6)
7,920,4
87.14
35.48
6,006.14
-5,935.14
3,466.31
422.91
6,003,941.50
498,233.17
6.97
3,466.31
MWD (6)
121712018 3:45:02PM Page 3 COMPASS 5000.14 Build 85D
y=�
a
m
4
a
O
M
O
W
p
c
I
III
E
E
z
o
I
sees
SS
m m io
m m
m io io m �?
m
m m'
�o �p
a�
m
is u
m
ipso
a
-0-0-0
�
m
�
A m
N n
0
NN�
V
N O
O)
0 G
m
Q O
N S
W
P
Q
Q
10
U Oi
N
1p
�Mp
p
y yy'
0
O
M N
Ips N O
n
Q Q?
M Cml
M
O Im•1
Oi N
N N^
p
Y41
N
N
tD 0
1p IM1
n A
0�1
O
p
-i
>
m
M
Cl
lh
(h M
M
m m m
m m
m m lh 1+1
<
V V
P P
P
P 4
Y Q
Y<
m
n
T
ty
m
m
m
o
in No
m N
m m
m 'v
r'Sm
b
N r
P N
O V...
mO 0 Q P Q
V<
IM
OO Q
m f0
1G
(O
2
Q
Q
J
P
n]
f
f 0 m N
f
m
n �p
m
OI OI
M P
M
N
IMO
fOV
>
M
M
f�
W
6 C ^N
N
N
N
t7
M
N y C M
m
aV
m
m
m T N
m 0
mm m m mm
m 0 0 Ol Q
0
Q N
N N
Oml
m Omi
mm m
0
Q
Omi I
p
O.
1
Y
O
m
S
0)
N
O
Oi O
r 0
p p
bp m
CI N
I� a) tD,
O
O P
T
T
p
O O
m
dOi,
o
m
ry�ry p
y
p�
O
p
�p
O
M P
P
Ny
N4,
10
1VV0
M
W
n'
_ i
O
q
O
S
y O
O
O
g [�
�'
S S
Np N
S S
p
S O
y y
0 p 00 00 S$
,Q
,yQ
O
S
y
O Op
y y
Op 00
O
O
�R
S
S S
E
o
m
m
m
m
16
� 16
16 16
i6 to to
to cu
cd cd e a �
lc
lti i6
e e
�
� �
� �
^
�
T
m
N
�
t4 CJ
Oi m
lV 1�
m m
N
O Q
O O
O
O pS� m
m
N
Q
N
o>
�
i
�
�
'J• � $
(�
Cj
t?
1�1 �
� •
� N N
N N
N N N N
N
N •
• i
i
i �
� N
f o
S
oui
5
Z
N
0m
1
10
W
1p0
0
pp
n M
p
N r
O N t�
O
Op
� r
y10�
Oq
mpt�
0
T O
N1y O
m
O
�m
8 p
2 S
p
O
p q
o f
8
N
ry
N N
T C V
N
N
N
N
m m
10
m m
m Ol O� Ol
O
S
M
m
N
N N N m a;
m
`m
$i m
8
m
L9
m
p
m
m
m
Si m
m m m
_ m
m m rn
m
m
m rn
V h
N
Y7
N
Yl
h N
� �
� � �
Vl N
0 N N Yr N
N
•(r N
N
•N
9 4
Y7
N
pN
U
� V
N
m
10
(p
Ip
N
N N N
N h
h N N N
N
•N N
UI N
N
N N
N N
N
YI
C
m
�•
M
m
�p
mm
V
10
� m
p pp
�
p
�
mm
m m W
CI
0 0
P m
P
O m
O A
0
V)
O
a
tM0
2
O
M
N
m
N
�1�p7p
N
N
(•1 m
N
C'1
t2 V
m YO]
N
m
N
m
N^
G �
M
N
N
N
M m
m
n
d
a
Z
o
0
8
2
2
M
MG
'8
M
8
8 8
v S
4 m .p
m S
8 18, R 8
8
8 o
n S
R'
o,
e
N
1I
o;
m m
m
fO
U
Y
Y
OJ•
�jO
N
N
�
0 W
� YI
to0 ��
fpNU
0
O 100
� 1st
�
N O
r
C
�y
p
O (•!
ry
10 Ol
ON
VV
p m
Q
...
N
p
8
m
0
C
..
m
..
0
O�
O
m
m
N N N
M M.
P 4_
m
m
IM1
lc m vm
i
m
mm
m m
m
m m
m m
m
m
a
m
4
a
O
M
0
m
fi
m'
Qo
0
7i
m
�
o
c
a
a
Q
�
O
U
v
'
E
v
z
�
0
0
0
H
U
Ngggggg���g��gg�g�g�a
m
� Ips
N�
O
r
m M m 0
P
m m e m
N�
M
bm
NV
y
Ih
Q
'
P
Cat
Y V so
P O
Y
N N
N
q
N� N t0
fmr0 r 0�
m mp
d y O
P
O
O
Z
m
J 0 I�
Oi VI
VI
{OO
lV
C) N < (O
CI
C] r t0 10
OI O
r
r
J
Yq
0
M
E
S
m
of
m
-
m
N
N
N N
wpm
m e
m
171
�+
Ct
m m
Ct
m
N N
m m m
m
m� ;;
i m v
w
e
P
Q v
v
v v
v e v
v
v e e v
v i
m
t
v
m em
m
m
`8
n
m io n�
m m n
m m
m�
N
YI y N
m l�
LL'
i
C O
S
00
O o
0 0
O
s
O
0
a
U
`u
m
C V
n
m
m e
e
n
m o$
in m m
o n m
v m
d'
m
t m
a
ati
m m
o
of
lmv
m m rti 6
oe
ca' ImJ
of N
m c?
JF�
2
0O
}�
pp
m
g r
ONI
N
m O
I�
po �p
P N O m m
Q
m
m m r 10
Oel O
C�
P
O
N
b m m n
0 m
m
�i
Q P
N N
Omi
} v
Q
e m
P
N m
O
OI m
� r m�
N 0
% m
A OI
Oi
OI
Ifl Ip (O
IU N VI VI f0
N
I�
Oi O
m
N g m
m m
lmV
m
N
N
m
m
m `m rn
m
Yl N
19
p
r
m
Iel
P
N m
0
A m m m
pN
V N m m
N Q
(D
m
V
v
m
N
N
N h
m
m N N N N
N
m m
N N
qC
Y
N
m
m rl
m
m
n o°i m
d
m
d
N
N
lyi
lyi
x
4
l p
a
N
J
J
O
m
m
m
�y p
C! e
m
p
O
m CI
mm
y�
m N Imo N N
(V
l7
O ry
O (p N O
1p
Y P
C m
m m
m
m
m m
m
m$ m m m
rm
m rm m rm
m m
U
Y44
Y
M lti
of
=
a
N
O
r_
m e
m
�_
b NO�p
pp
N
yy��
IpNpp O N m�
P
IIpp
N OO mo�y�
Y� p
p
r
1p O
Q Q
M
C
..
O
lel
0 0
0
f N N
N
m lC (ml tml
d
y
E
T
�� m
m m
m
m
m Oi
T
Oi pi m 0 li
li
Oi q pi m
m m
{�y
THE STATE
°fALASKA
GOVERNOR BILL WALKER
James Ohlinger
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 3H-13AL1-02
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 218-137
Surface Location: 1182' FNL, 281' FWL, SEC. 12, T12N, R8E, UM
Bottomhole Location: 966' FNL, 5204' FEL, SEC. 01, TI 2N, R8E, UM
Dear Mr. Ohlinger.
333 West 7th Avenue
Anchorage, Alaska 99501
Main: 907.297.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Enclosed is the approved application for the permit to redrill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 196-197, API No. 50-103-20089-
01-00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
ST
DATED this3 � day of October, 2018.
Sincerely,
Daniel T.
Commissioner
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
9n AAr- og ring
1a. Type of Work:
Drill ❑ Lateral ❑Q
Redrill ❑ Reentry 01
1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG Service - Disp ❑
Stratigraphic Test ❑ Development - Oil ❑� ' Service - Winj ❑ Single Zone
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
tc. Specify if well is proposed for:
Coalbed Gas ❑ Gas Hydrates ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
5. Bond: Blanket ❑✓ • Single Well ❑
Bond No. 5952180
11. Well Name and Number:
KRU 3H-13AL1-02 '
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
6. Proposed Depth:
MD: 10000' TVD: 6060'
12. Field/Pool(s):
Kuparuk River Field!
Kuparuk River Oil Pool '
4a. Location of Well (Governmental Section):
Surface: 1182' FNL, 281' FWL, Sec 12, T12N, R8E, UM
Top of Productive Horizon:
3368' FNL, 465' FEL, Sec 02, T12N, R8E, UM
Total Depth:
966' FNL, 5204' FEL, Sec 01, T12N, R8E, UM
7. Property Designation:
ADL 25531
8. DNR Approval Number:
LONS 84-134 & LONS 84-149
13. Approximate Spud Date:
10/24/2018
9. Acres in Property:
2560
14. Distance to Nearest Property:
6630'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
Surface: x- 498655 y- 6000475 Zone- 4
10. KB Elevation above MSL (ft): 76'
GL / BF Elevation above MSL (ft): 34'
15. Distance to Nearest Well Open
to Same Pool: 156,31-1-13A
16. Deviated wells: Kickoff depth: 7430 • feet
Maximum Hole Angle: 95 degrees
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Downhole: 4897 • Surface: 4299
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade Coupling I Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.7# L-80 ST -L 2350'
7650' 6005' 10000' 6060' Slotted
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MO (ft): Effect. Depth TVD (ft): Junk (measured):
7755' 6203' N/A 7653' 6150' N/A
Casing Length Size Cement Volume MD TVD
Conductor/Structural 74' 16" 245 sx AS 1 110' 110'
Surface 3037' 9-5/8" 1300 sx ASII I, 400 sx G, 70 sx ASI 3072' 2929'
Production 5937' 7" 300 sx G, 175 sx AS 1 5970' 5173'
Liner 1947' 3-1/2" 311 sx G 7755' 6203'
Perforation Depth MD (ft): 7229'- 7249', 7258'- 7308' Perforation Depth TVD (ft): 5927'- 5938', 5943'- 5969'
7356' - 7366', 7372' - 7380' 5994'- 6000', 6002'- 6007'
Hydraulic Fracture planned? Yes❑ No P
20. Attachments: Property Plat ❑ BOP Sketch
Diverter Sketch
e Drilling Program B Time v. Depth Plot B Shallow Hazard Analysis
Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements e✓
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval. Contact Name: Keith Herring
Authorized Name: James Ohlinger Contact Email: Keith. E.Herrin c0 .Com
Authorized Title: Staff CTD ngineer Contact Phone: 907-263-4321
Authorized Signature: Date: 101:2-1pCo
Commission Use Only
Permit to Drill
Number: ($--13*
API Number:
50-fo3^BOO-'6s't^
Permit Approval
Date:
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: 19,
Other: B670 7-t,5 j- /V - fb 00 PS � .1., Samples req'd: Yes ❑ No&' Mud log req'd: Yes ❑ No [y
Directional svy req'd: Yes [ErNo❑
r, V1 Lzr 7" I—f ✓f✓>' %"lr S t 7b 1 ✓5�a measures: Yes [r No[-] Directional
{rR%- /`c!•f9 G Y �'2'J a D ,1}f}L' zS, �/ Jit b�g Pbon req'd: Yes ❑ No L7 Inclination -only svy req'd: Yes ❑ No, §-_
�S pr�n�Cd 1n Post initial injection MIT req'd: Yes[] Nog
J )to a{lo r,1-thr kr �447FF O/tri f- ✓� bG
I -Yt«a
APPROVED BY / Q
Approved by: COMMISSIONER THE COMMISSION Date: d
Q� ��
1 /r �T�oni tlb-401 Revised 5/2017 This pemtit is a I or
h o
h
Submit Form and
el per 20 AAC 25.QA5(g) , Attachments in 13mlirate
Qq A05atot 18
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
October 23, 2018
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill four laterals out of the KRU 3H -13A
(PTD# 196-197) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin on October 24, 2018. The objective will be to drill four laterals KRU 3H-
13AL1, 31-1-13AL1-01, 3H-13AL1-02 and 3H-31AL1-03 targeting the Kuparuk A -sand interval.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20
AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of
being limited to 500' from the original point.
Attached to this application are the following documents:
- Permit to Drill Application Forms (10-401) for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03
- Detailed Summary of Operations
- Directional Plans for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03
- Current wellbore schematic
- Proposed CTD schematic
If you have any questions or require additional information, please contact me at 907-263-4321.
Sincerely,
Keith Herring
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Kuparuk CTD Laterals
31-1-13AL1, 3H-13AL1-01, 31-1-13AL1-02, & 31-1-13AL1-03
Application for Permit to Drill Document
1.
Well Name and Classification........................................................................................................ 2
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))...................................................................................................................2
2.
Location Summary.......................................................................................................................... 2
(Requirements of 20 AAC 25.005(c)(2))..................................................................................................................................................2
3.
Blowout Prevention Equipment Information................................................................................. 2
(Requirements of 20 AAC 25.005(c)(3)).................................................................................................................................................2
4.
Drilling Hazards Information and Reservoir Pressure.................................................................. 2
(Requirements of 20 AAC 25.005(c)(4)).................................................................................................................................................2
5.
Procedure for Conducting Formation Integrity tests................................................................... 2
(Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2
6.
Casing and Cementing Program.................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3
7.
Diverter System Information.......................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3
8.
Drilling Fluids Program.................................................................................................................. 3
(Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3
9.
Abnormally Pressured Formation Information.............................................................................4
(Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4
10.
Seismic Analysis............................................................................................................................. 4
(Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4
11.
Seabed Condition Analysis............................................................................................................ 4
(Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4
12. Evidence of Bonding...................................................................................................................... 4
(Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4
13. Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4
Summaryof Operations...................................................................................................................................................4
LinerRunning...................................................................................................................................................................5
14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 6
15. Directional Plans for Intentionally Deviated Wells....................................................................... 6
(Requirements of 20 AAC 25.050(b))......................................................................................................................................................6
16. Attachments....................................................................................................................................6
Attachment 1: Directional Plans for 31-1-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 3H-13AL1-03 laterals ..........................6
Attachment 2: Current Well Schematic for 3H-13A.........................................................................................................6
Attachment 3: Proposed Well Schematic for 3H-13AL1, 31-1-13AL1-01, 3H-13AL1-02, & 31-1-13AL1-03 laterals ............6
Page 1 of 6 October 23, 2018
PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 31-1-13AL1-03
1. Well Name and Classification
(Requirements of 20 AAC 25.005(o and 20 AAC 25.005(b))
The proposed laterals described in this document are 3H-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, and 31-1-13AL1
03. The laterals will be classified as "Development -Oil' wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface
and subsurface coordinates of the 31-1-13AL1, 31-1-13AL1-01, 3H-13AL1-02, and 31-1-13AL1-03.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,800 psi. Using the
maximum formation pressure in the area of 4,897 psi in 31-1-22 (i.e. 15.5 ppg EMW), the maximum
potential surface pressure in 31-1-13A, assuming a gas gradient of 0.1 psi/ft, would be 4,299 psi. See
the "Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 3H -13A was measured to be 2,567 psi (8.3 ppg EMW) on 9/16/2015. The
maximum downhole pressure in the 3H -13A vicinity is the 3H-22 at 4,897 psi (15.5 ppg EMW) measured on
6/17/2018.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) 11
The offset injection wells to 3H -13A have injected gas, so there is a possibility of encountering free gas while
drilling the 31-1-13A laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage
tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 31-1-13A laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 3H -13A laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation
integrity test is not required.
Page 2 of 6 October 23, 2018
PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm
MD
MD
MD
TVDSS
TVDSS
Conductor
3H-13AL1
7,750'
10,600'
5,932'
5,935'
2-3/8", 4.7#, L-80, ST -L slotted liner;
0'
110'
1640
670
Surface
aluminum billet on to
3H-13AL1-01
7,430'
10,600'
5,940'
5,900'
2-3/8", 4.7#, L-80, ST -L slotted liner;
2929'
3520
2020
Production
7"
aluminum billet on to
3H-13AL1-02
7,650'
10,000'
5,929'
5,984'
2-3/8", 4.7#, L-80, ST -L slotted liner;
4980
4320
Liner
3-1/2"
9.3
aluminum billet on to
3H-13AL1-03
7,330'
10,000'
5,910'
5,942'
2-3/8, 4.7#, L-80, ST -L slotted liner;
10540
Tubing
3-1/2"
9.3
J-55
with de to mant on to
Existing Casing/Liner Information
Category
OD
Weight
f
Grade
Connection
Top
MD
Btm
MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
0'
110'
0'
110'
1640
670
Surface
9-5/8"
36.0
J-55
BTC
0'
3072'
0'
2929'
3520
2020
Production
7"
26.0
J-55
BTC
0'
5970'
0'
5173'
4980
4320
Liner
3-1/2"
9.3
L-80
BTC -MOD
5808'
7755'
5049'
6203'
10160
10540
Tubing
3-1/2"
9.3
J-55
EUE 8rd
0'
5836'
0'
5071'
6980
7400
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Chloride -based PowerVis mud (8.6 ppg)
— Drilling operations: Chloride -based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically
overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide
formation over -balance and shale stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases,
the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke.
BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment
Information".
In the 3H -13A laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
Page 3 of 6 October 23, 2018
PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Pressure at the 3H-13 Window (7338' MD. 5985' TVD) Usina MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
Well KRU 3H -13A is a Kuparuk A -sand producer equipped with 3-1/2" tubing and 3-1/2" production liner.
The CTD sidetrack will utilize four laterals to target the A sand to the north and south of the 314-13A parent
wellbore. The laterals will increase recovery and add additional resources.
Pre -CTD Work
1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP.
2. RU Service Coil: Mill out "D" nipple and conduct fill cleanout.
3. Prep site for Nabors CDR3-AC rig.
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" EOPE, test.
2. 3H-13AL1 Lateral (A1 sand - south)
a. Set top of whipstock at 7338' MD.
Page 4 of 6 October 23, 2018
Pumps On 1.8 bpm)
Pumps Off
A -sand Formation Pressure 8.3
2567 psi
2567 psi
Mud Hydrostatic 8.6
2677 psi
2677 psi
Annular friction i.e. ECD, 0.08psi/ft)
587 psi
0 psi
Mud + ECD Combined
no chokepressure)
3264 psi
Overbalanced -697psi)
2677 psi
Overbalanced -110psi)
Target BHP at Window 11.8
3672 psi
3672 psi
Choke Pressure Required to Maintain
Target BHP
408 psi
995 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
Well KRU 3H -13A is a Kuparuk A -sand producer equipped with 3-1/2" tubing and 3-1/2" production liner.
The CTD sidetrack will utilize four laterals to target the A sand to the north and south of the 314-13A parent
wellbore. The laterals will increase recovery and add additional resources.
Pre -CTD Work
1. RU Slickline: Drift tubing with dummy whipstock and obtain SBHP.
2. RU Service Coil: Mill out "D" nipple and conduct fill cleanout.
3. Prep site for Nabors CDR3-AC rig.
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" EOPE, test.
2. 3H-13AL1 Lateral (A1 sand - south)
a. Set top of whipstock at 7338' MD.
Page 4 of 6 October 23, 2018
PTD Application: 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03
b. Mill 2.80" window at 7338' MD.
c. Drill 3" bi-center lateral to TD of 10600' MD.
d. Run 2-3/8" slotted liner with aluminum billet from TD up to 7750' MD.
3. 3H-13AL1-01 Lateral (A2/A3 sand - south)
a. Kick off of the aluminum billet at 7750' MD.
b. Drill 3" bi-center lateral to TD of 10600' MD.
c. Run 2-3/8" slotted liner with aluminum billet from TD up to 7430' MD.
4. 311-13AL1-02 Lateral (Al sand - north)
a. Kickoff of the aluminum billet at 7430' MD.
b. Drill 3" bi-center lateral to TD of 10000' MD.
c. Run 2-3/8" slotted liner with aluminum billet from TD up to 7650' MD.
5. 3H-13AL1-03 Lateral (A2/A3 sand -north)
a. Kickoff of the aluminum billet at 7650' MD.
b. Drill 3" bi-center lateral to TD of 10000' MD.
c. Run 2-3/8" slotted liner with deployment sleeve from TD up to 7330' MD.
6. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC rig.
Post -Rig Work
1. Obtain SBHP.
2. Change out gas lift design.
3. Return well to production.
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
- Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
- Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slickline.
- When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
- The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA un -deployment, the steps listed above are observed, only in reverse.
Liner Running
- The 3H -13A laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids"
section for more details.
- While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency
deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a
Page 5 of 6 October 23, 2018
PTD Application: 31-1-13AL1, 31-1-13AL1-01, 31-1-13AL1-02, & 31-1-13AL1-03
deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide
secondary well control while running 2-3/8" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AA 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
- The Applicant is the only affected owner.
- Please see Attachment 1: Directional Plans
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
- MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
- Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name Distance
3H-13AL1
4760'
3H-13AL1-01
4820'
3H-13AL1-02 •
6630'
3H-13AL1-03
6850'
Distance to Nearest Well within Pool
Lateral Name
Distance
Well
3H-13AL1
703'
31-1-12A
3H-13AL1-01
703'
31-1-12A
3H-13AL1-02
155'
31-1-13A
3H-13AL1-03
155'
31-1-13A
16. Attachments
Attachment 1: Directional Plans for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, & 3H-13AL1-03laterals
Attachment 2: Current Well Schematic for 3H -13A
Attachment 3: Proposed Well Schematic for 3H-13AL1, 3H-13AL1-01, 3H-13AL1-02, &3H-13AL1-03 laterals
Page 6 of 6 October 23, 2018
ConocoPhillips
Project: Kuparuk River Unit
Site: Kupanak 3H Pad
mernilc ea:n: e�
wty:inlrn.a
WELLBORE DETAILS: 3H-13AL1
xEFExExcE Il
Parent Wellbore: 3H -13A
c9aal,ae Ixa) aelrerce: Wel3x-t; clue wun
Well: 3H-13
sue:vm.nna.sn
Te an MD'. ]3011.00
vemwHnml antrerce: 3Ht3�J6.aounl3x43)
Se lion Nsl xerererce: ald-to.oax,sooEj
Wellbore: L1
Plan: 3X513ALt_wp04 ((3H-1H-13gH-13AL1)
p.l:°�in�rt0i
8kazuretl Oq,N Rehienx 3H13 � JB.WIsa13413)
—
MOEe1. eaouml
ceeuanm Ineuwa: Mdm:nn cwewre
BAIUGHES
a GEc.., ,'
p bzL;163_L ur
IlLagl!-2+ -
:II-JI/311JIAL1 dll-EE/311'_^[HO Al 1 "Pil-9.h11-no
II .'All
''All :LH P11n
111 111111=1 I I'll.
_ RA
I
7650
200 "'i
1.
c999 3143:n14P_ (51;:R1 -➢-3111,fl
it JI
] 5001. II loll :'I.I 1 311 1 I _I:
6750
9ld � 1
filo
/�11 .f1 1+I1'I LL
61001 n l 311 unr-1.1
58501 'II IUi91-19 UO�q `°Op uy II 1. aPul
_ -xomi
y
5400 11. 11 -fi4 n -01 1 a � 11 fYuf'INI
G 4950 - ----
j4500 u:mal all Mil
C �- all-xL I1-11 t 1 I'Ill (,���
W, 4050 ca -.-
311 ! 111 JI ail riv H �I)-IJIII l
-1.31n16^_n 'nl-wx.a L:x1Hn - - soon
1
310
O 50 3 I I 111-1ti,n nl.lvnbl5 n11 'M li �1 sl0n u � 't lx I4 111 113111 n11 �141nH1
u
-1F 411-Ik c^ O[' n1 11i-Id/iN I1�I ql
S _ _ 311-ILnI 14N
o B(1QIN II -I -11'11 1
250-
Sn-I. III
ISOD
1� -'n1i 11 2 Ai II 1i R 311/ 1V P/ 5 _ u 11 11 1 V.1 ,%1 Bill-IIAI2411. .
13sD 3N s•u�nnPly. u �o-u rnnnm
.III .1 1.3
900
' d L IIV IH I I I yam.
450
I I� S/uJ
311-Inli l -In II 1 II-4Vf � 1 • ��
_ r r
911 II I'_ll "Yfi '
311 19I3FFIUC
'•� it l-IM1a11-1rrr\1'111 311a Y1311 fK slilNi II .IJ+I IS"L 11 I:va ICI.I 'V
IH
900 J,: _ I
11 _ I"i/"33n11-:+V ovn
1350 .III-In11I Hef. .
-1800101-- -750.61- 540 4 _-•--I---
-]650 T 56
00 6950 6300 50 540950 -1500 -0050 3600 3150-2]00 -1250 -1800 -I 350 9 22 90 550 9d0 150 1800 50 700 150 16060 4 1
0 4050 3$0U 495D 400 5650 63D0 07 50 Z00
3xnn311-n1 Westf-1/f?acil+l l`da0 iixft/inl ._._..._ M-mmla 311-1.O14d3A
3H-13 @ 75.ODusit (3H-13)
ConocoPhillips
_ConocoPhillips Export Company
Kuparuk River Unit
Kuparuk 3H Pad
3H-13
3H-13AL1-02
Plan: 3H-13AL1-02_wp02
Standard Planning Report
22 October, 2018
BER
GHES
BA
`. ConocoPhiilips
ConocoPhillips Planning Report RF UGHES
a GEmmpa,
Database:
EDT 14 Alaska Production
Company:
_ConomPhillips Export Company
Project:
Kuparuk River Unit
Site:
Kuparuk 3H Pad
Well:
31-1-13
Wellbore:
3H-13AL1-02
Design:
3H-13ALl-02_wp02
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
We113H-13
Mean Sea Level
31-1-13 @ 76.00usft (3H-13)
True
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site Kupamk 3H Pad
Site Position:
Northing:
6,000,110.73 usft
Latitude: 70° 24'41.531 N
From: Map
Easting:
498,655.44usft
Longitude: 150° 0'39,416 W
Position Uncertainty: 0.00 usft
Slot Radius:
0.000in
Grid Convergence: -0.01 °
Well 3H-13
Well Position +N/ -S 0.00 usft Northing: 6,000,475.46 usft . Latitude: 70° 24'45.119 N
+E/ -W 0.00 usft Easting: 498,655.42 usft - Longitude: 150° 0'39.419 W
Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft
Wellbore 3H-13AL1-02
Magnetics Model Name Sample Date Declination Dip Angie Field Strength
(°) V) (nT)
BGGM2018 11/1/2018 16.83 80.91 57,435
Design 3H-13AL1-02_vep02
Audit Notes:
Version: Phase: PLAN Tie On Depth: 7,430.00
Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction
(usft) (usft) (usft) (°)
0.00 0.00 0.00 0.00
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/ -S
+E/ -W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°1100usft)
(°/100usft)
('110(jusft)
(°) Target
7430.00
89.32
48.89
5,940.13
3,094.19
-748.87
0.00
0.00
0.00
0.00
7,530.00
95.38
45.38
5,936.04
3,162.11
-675.68
7.00
6.06
-3.51
-30.00
7,700.00
90.28
34.61
5,927.63
3,291.99
-566.78
7.00
-3.00
-6.34
-115.00
8,000.00
90.26
13.60
5,926.19
3,564.29
-444.95
7.00
-0.01
-7.00
-90.00
8,250.00
81.61
358.34
5,944.00
3,811.32
418.92
7.00
-3.46
-6.10
-120.00
8,360.00
85.50
351.66
5,956.36
3,920.12
428.46
7.00
3.54
-6.08
-60.00
8,460.00
90.02
346.30
5,960.27
4,018.14
-447.55
7.00
4.51
-5.36
-50.00
8,860.00
90.01
14.30
5,960.16
4,414.16
-445.47
7.00
0.00
7.00
90.00
9,200.00
85.20
350.97
5,974.54
4,751.06
-429.85
7.00
-1.42
-6.86
-102.00
9,450.00
89.87
7.85
5,985.36
4,999.84
-432.35
7.00
1.87
6.75
75.00
9,850.00
90.36
35.85
5,984.55
5,367.42
-284.96
7.00
0.12
7.00
89.00
10,000.00
90.35
25.35
5,983.63
5,496.35
-208.71
7.00
0.00
-7.00
-90.00
10!222018 6:20'34PM Page 2 COMPASS 5000.14 Build 85D
ConocoPhillips BR
ConocoPhillips Planning Report UGHES
a Uco.paq
Database:
EDT 14 Alaska Production
Local Coordinate Reference:
Well 3H-13
Company:
_ConocoPhillips Export Company
TVD Reference:
Mean Sea Level
Project:
Kuparuk River Unit
MD Reference:
31-1-13 @ 76.00usft (31-1-13)
Site.
Kuparuk 3H Pad
North Reference:
True
Well:
31-1-13
Survey Calculation Method:
Minimum Curvature
Wellbore:
31-1-13AL1-02
Measured
Design:
3H-13AL1-02_wp02
Planned Survey
Measured
TVD Below 46
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination
Azimuth
System
tN/S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(1
(e)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°)
(usft)
(usft)
7,430.00
89.32
48.89
5,940.13
3,094.19
-748.87
3,094.19
0.00
0.00
6,003,569.47
497,907.18
TIP/KOP
7,500.00
93.56
46.43
5,938.37
3,141.30
-697.16
3,141.30
7.00
-30.00
6,003,616.57
497,958.90
7,530.00
95.38
45.38
5,936.04
3,162.11
-675.68
3,162.11
7.00
-30.06
6,003,637.38
497,980.38
Start 7 die
7,600.00
93.29
40.93
5,930.75
3,213.02
-627.96
3,213.02
7.00
-115.00
6,003,688.27
498,028.10
7,700.00
90.28
34.61
5,927.63
3,291.99
-566.78
3,291.99
7.00
-115.34
6,003,767.22
498,089.29
3
7,800.00
90.28
27.61
5,927.14
3,377.56
-515.15
3,377.56
7.00
-90.00
6,003,852.77
498,140.92
7,900.00
90.27
20.61
5,926.65
3,468.78
-474.34
3,468.78
7.00
-90.03
6,003,943.98
498,181.75
8,000.00
90.26
13.60
5,926.19
3,564.29
-444.95
3,564.29
7.00
-90.07
6,004,039.48
498,211.16
4
8,100.00
86.77
7.54
5,928.78
3,662.50
-426.61
3,662.50
7.00
-120.00
6,004,137.67
498,229.51
8,200.00
83.31
1.43
5,937.43
3,761.76
-418.82
3,761.76
7.00
-119.84
6,004,236.92
498,237.32
8,250.00
81.61
358.34
5,944.00
3,811.32
-418.92
3,811.32
7.00
-119.31
6,004,286.47
498,237.23
6
8,300.00
83.37
355.29
5,950.54
3,860.80
-421.67
3,860.80
7.00
-60.00
6,004,335.95
498,234.49
8,360.00
85.50
351.66
5,956.36
3,920.12
-428.46
3,920.12
7.00
-59.60
6,004,395.27
498,227.71
6
8,400.00
87.31
349.51
5,958.87
3,959.50
-434.99
3,959.50
7.00
-50.00
6,004,434.64
498,221.19
8,460.00
90.02
346.30
5,960.27
4,018.14
-447.55
4,018.14
7.00
-49.87
6,004,493.28
498,208.63
7
8,500.00
90.02
349.10
5,960.26
4,057.22
-456.07
4,057.22
7.00
90.00
6,004,532.35
498,200.12
8,600.00
90.02
356.10
5,960.23
4,156.32
-468.94
4,156.32
7.00
90.00
6,004,631.45
498,187.27
8,700.00
90.02
3.10
5,960.20
4,256.26
-469.64
4,256.26
7.00
90.00
6,004,731.38
498,186.60
8,800.00
90.02
10.10
5,960.17
4,355.53
-458.15
4,355.53
7.00
90.00
6,004,830.64
498,198.10
8,860.00
90.01
14.30
5,960.16
4,414.16
-445.47
4,414.16
7.00
90.01
6,004,889.26
498,210.79
8
8,900.00
89.43
11.56
5,960.35
4,453.15
-436.52
4,453.15
7.00
-102.00
6,004,928.24
498,219.75
9,000.00
87.99
4.71
5,962.60
4,552.05
-422.37
4,552.05
7.00
-101.99
6,005,027.13
498,233.91
9,100.00
86.57
357.85
5,967.36
4,651.85
-420.14
4,651.85
7.00
-101.83
6,005,126.92
498,236.16
9,200.00
85.20
350.97
5,974.54
4,751.06
-429.85
4,751.06
7.00
-101.51
6,005,226.12
498,226.47
9
9,300.00
87.04
357.74
5,981.31
4,850.26
-439.65
4,850.28
7.00
75.00
6,005,325.34
498,216.68
9,400.00
88.92
4.48
5,984.84
4,950.14
-437.72
4,950.14
7.00
74.54
6,005,425.18
498,218.64
9,450.00
89.87
7.85
5,985.36
4,999.84
-432.35
4,999.84
7.00
74.30
6,005,474.88
498,224.02
10
9,500.00
89.93
11.35
5,985.45
5,049.13
-424.01
5,049.13
7.00
89.00
6,005,524.16
498,232.36
9,600.00
90.06
18.35
5,985.46
5,145.73
-398.40
5,145.73
7.00
88.99
6,005,620.75
498,257.99
9,700.00
90.18
25.35
5,985.25
5,238.49
-361.20
5,238.49
7.00
88.99
6,005,713.49
498,295.20
9,800.00
90.30
32.35
5,984.84
5,326.02
-312.98
5,326.02
7.00
89.01
6,005,801.01
498,343.43
9,850.00
90.36
35.85
5,984.55
5,367.42
-284.96
5,367.42
7.00
89.04
6,005,842.39
498,371.46
11
9,900.00
90.36
32.35
5,984.24
5,408.82
-256.93
5,408.82
7.00
-90.00
6,005,883.78
498,399.49
10,000.00
90.35
25.35
5,983.63
5,496.35
-208.71
5,496.35
7.00
-90.02
6,005,971.30
498,447.72
Planned TD
at 10000.00
10/222018 6: 20: 34PM Page 3 COMPASS 5000.14 Build 85D
Local Coordinates
Hole
ConocoPhillips
ConocoPhillips
Planning Report
Database:
EDT 14 Alaska Production
Local Co-ordinate Reference:
Company:
_ConocoPhillips Export Company
TVD Reference:
Project:
Kuparuk River Unit
MD Reference:
Site:
Kupamk 3H Pad
North Reference:
Well:
3H-13
Survey Calculation Method:
Wellbore:
3H-13AL1-02
5,960.27
Design:
3H-13AL1-02_wp02
9,200.00
Casing Points
9,450.00
5,985.36
9,850.00
Measured Vertical
10,000.00
5,983.63
Depth Depth
9
4,999.84
(usft) (usft)
Name
5,367.42
10,000.00 5,983.83 2 3/8"
11
Local Coordinates
Hole
Plan Annotations
Measured
Vertical
Depth
Depth
(usft)
(usft)
7,430.00
5,940.13
7,530.00
5,936.04
7,700.00
5,927.63
8,000.00
5,926.19
8,250.00
5,944.00
8,360.00
5,956.36
8,460.00
5,960.27
8,860.00
5,960.16
9,200.00
5,974.54
9,450.00
5,985.36
9,850.00
5,984.55
10,000.00
5,983.63
Local Coordinates
Hole
«N/S
+E/ -W
(in)
(usft)
(usft)
Comment
3,094.19
-748.87
TIP/KOP
3,162.11
-675.68
Start 7 dls
3,291.99
-566.78
3
3,564.29
444.95
4
3,811.32
418.92
5
3,920.12
428.46
6
4,018.14
447.55
7
4,414.16
445.47
8
4,751.06
429.65
9
4,999.84
432.35
10
5,367.42
-284.96
11
5,496.35
-208.71
Planned TD at 10000.00
BAF�UGHES
a GEcompany
Well 3H-13
Mean Sea Level
3H-13 @ 76.00usft (311-13)
True
Minimum Curvature
Casing
Hole
Diameter
Diameter
(in)
(in)
2.375
3.000
10222018 6:20:34PM Page 4 COMPASS 5000.14 Build 85D
ConocoPhillips BAER
ConocoPhillips Travelling Cylinder Report UGHES
aGEmmpany
Company:
ConocoPhillips (Alaska) Inc. -Kup2
Project:
Kupamk River Unit
Reference Site:
Kuparuk 3H Pad
Site Error:
0.00 usft
Reference Well:
3H-13
Well Error:
0.00 usft
Reference Wellbore
3H-13AL1-02
Reference Design:
3H-13AL1-02_wp02
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 3H-13
3H-13 @ 76.00usft (3H-13)
3H-13 @ 76.00usft (311-13)
True
Minimum Curvature
1.00 sigma
EDT 14 Alaska Production
Offset Datum
Reference
3H-13AL1-02_wp02
Filter type:
NO GLOBAL FILTER: Using user defined selection & filtering criteria
Interpolation Method:
MD Interval 25.00usft Error Model: ISCWSA
Depth Range:
7,430.00 to 10,000.00usft Scan Method: Tray. Cylinder North
Results Limited by:
Maximum centercenter distance of 1,192.40 usft Error Surface: Pedal Curve
Site Name
Offset Well - Wellbore - Design
Kupawk 3H Pad
311-10-3H-10CL2-3H-1 OCL2
311-10 - 3H40CL2-02 - 3H-10CL2-02
311-11 -3H-11 -3H-11
3H -11 -3H -11A -3H -11A
3H -11-3H-11 AL1-3H-11AL7
3H-11 - 311-11 AL1 -01 - 3H-11 AL1 -01
3H-12 - 311-12 - 311-12
311-12 - 3H -12A- 3H -12A
3H -12-311i - 3H-12AL1
3H-12 - 3H-12AL2 - 3H-1 2AL2
3H-12 - 3H-12AL3 - 3H-12AL3
3H-12-3H-12APB7-3H-12APB1
3H-13 - 3H -13A - 3H -13A
311-13-311-13AL1-3H-13AL1_wpG4
3H-13 - 3HA 3AL1-01 - 3H-13AL1-01_wp01
3H-13 - 311-13AL1-03 - 3H-13AL1-03_wp03
3H-14 - 3H-14 - 3H-14
3H -14 -3H -14A -3H -14A
3H-14-3H-14APB1-3H-14APB1
3H-14 - 3H -14B - 3H -14B
3H-14-3H-141311-3H-14BL1
3H-14-311-14BL2-3H-14BL2
311-14 - 3H-14BL3 - 311-14BL3
311-14 - 3H-14BL4 - 311-14BL4
311-17 - 3H-17 - 3H-17
3H-19 - 311-19 - 311-19
Reference
Date 10/22/2018
Centre to
No -Go
Allowable
Survey Tool Program
Measured
Centre
Distance
From
To
Depth
Distance
(usft)
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
100.00
5,905.00 3H-13 (3H-13)
GCT -MS
Schlumberger OCT multishot
Out of range
6,118.56
7,300.00 3H -13A ATDB(3H-13A)
MWD
MWD - Standard
7,300.00
7,430.00 3H-13AL1_wp04(3H-13AL7)
MWD
MWD -Standard
7,430.00
10,000.00 311-13AL1-02_wp02(3H-13AL1-02)
MWD
MWD - Standard
Out of range
7,630.00
7,700.00
Casing Points
212.38
971.60
Pass - Major Risk
Measured Vertical
Casing
Hole
Out of range
Depth Depth
Diameter
Diameter
(usft) (usft)
Name
(in)
(in)
212.34
10,000.00 6,059.63 2 3/8"
Pass - Major Risk
2.375
3.000
Site Name
Offset Well - Wellbore - Design
Kupawk 3H Pad
311-10-3H-10CL2-3H-1 OCL2
311-10 - 3H40CL2-02 - 3H-10CL2-02
311-11 -3H-11 -3H-11
3H -11 -3H -11A -3H -11A
3H -11-3H-11 AL1-3H-11AL7
3H-11 - 311-11 AL1 -01 - 3H-11 AL1 -01
3H-12 - 311-12 - 311-12
311-12 - 3H -12A- 3H -12A
3H -12-311i - 3H-12AL1
3H-12 - 3H-12AL2 - 3H-1 2AL2
3H-12 - 3H-12AL3 - 3H-12AL3
3H-12-3H-12APB7-3H-12APB1
3H-13 - 3H -13A - 3H -13A
311-13-311-13AL1-3H-13AL1_wpG4
3H-13 - 3HA 3AL1-01 - 3H-13AL1-01_wp01
3H-13 - 311-13AL1-03 - 3H-13AL1-03_wp03
3H-14 - 3H-14 - 3H-14
3H -14 -3H -14A -3H -14A
3H-14-3H-14APB1-3H-14APB1
3H-14 - 3H -14B - 3H -14B
3H-14-3H-141311-3H-14BL1
3H-14-311-14BL2-3H-14BL2
311-14 - 3H-14BL3 - 311-14BL3
311-14 - 3H-14BL4 - 311-14BL4
311-17 - 3H-17 - 3H-17
3H-19 - 311-19 - 311-19
Reference
Offset
Centre to
No -Go
Allowable
Measured
Measured
Centre
Distance
Deviation Warning
Depth
Depth
Distance
(usft)
from Plan
(usft)
(usft)
lush)
(usft)
Min centre to center distance or covement point SF - min separation factor. ES - min ellinse senaratinn
10222018 3'30: 21PM Page 2 COMPASS 5000.14 Build 85D
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
7,630.00
7,700.00
1,181.04
212.38
971.60
Pass - Major Risk
Out of range
Out of range
7,630.00
7,700.00
1,181.04
212.34
971.63
Pass - Major Risk
Out of range
7,605.39
7,650.00
155.27
17.56
147.43
Pass- Major Risk
7,449.92
7,450.00
1.55
1.35
0.25
Pass- Major Risk
7,449.91
7,450.00
1.55
1.30
0.25
Pass - Major Risk
9,191.58
9,225.00
25.39
0.36
25.16
Pass - Minor 1/10
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
9,330.00
7,875.00
1,082.69
284.27
802.93
Pass - Major Risk
Out of ranae
Min centre to center distance or covement point SF - min separation factor. ES - min ellinse senaratinn
10222018 3'30: 21PM Page 2 COMPASS 5000.14 Build 85D
WELL DETAILS: 3H-13
+N/ -S +E/ -W Northing Easting Latitude Longitude
0.00 0.00 6000475.46 496655.42 70° 24'45.119 N 150° 0'39.419 W
Sec MD Inc Azi TVDSS +N/ -S +EAW Dleg TFace vsect Annotation
1 7430.00 89.32 48.89 5940.13 3094.19 -748.87 0.00 0.00 3094.19 TIP/K0P
2 7530.00 95.38 45.38 5936.04 3162.11 -675.68 7.00 -30.00 3162.11 Start 7 d15
3 7700.00 90.28 34.61 5927.63 3291.99 -566.78 7.00 -115.00 3291.99 3
4 8000.00 90.26 13.60 5926.19 3564.29 .444.95 7.00 -90.00 3564.29 4
5 8250.00 81.61 358.34 5944.00 3811.32 -418.92 7.00 -120.00 3811.32 5
6 8360.00 85.50 351.66 5956.36 3920.12 -428.46 7.00 -60.00 3920.12 6
7 8460.00 90.02 346.30 5960.27 4018.14 -447.55 7.00 -50.00 4018.14 7
8 8860.00 90.01 14.30 5960.16 4414.16 -445.47 7.00 90.00 4414.16 8
9 9200.00 85.20 350.97 5974.54 4751.06 -429.85 7.00 -102.00 4751.06 9
10 9450.00 89.87 7.85 5985.36 4999.84 -432.35 7.00 75.00 4999.84 10
11 9850.00 90.36 35.85 5984.55 5367.42 -284.96 7.00 89.00 5367.42 11
12 10000.00 90.35 25.35 5983.63 5496.35 -208.71 7.00 -90.00 5496.35 Planned TO at 10000.00
I
F`
Mean ;
c
Project: Kuparuk River Unit
Site: Kuparuk 3H Pad
Well: 3H-13
3H-i3/1L1-02
°
wee':=�e None last
wae"aa F.0,
s'.ewin naxa..
p Nq 90.9+
WELLBORE DETAILS: 3H-13ALt-02
FEFSENCE INFORWTION
BA <ER
F�UGHES
Parent Wetlbore: 3H-13ALt
Te on MD' 7430.00
coarEinele lxk�Relarerce: we13a-13.T:ue Nosh
V.1 (m) . MeanamL
S 6lo1-N.00N.e(CE)
ConoeoPhillips
Wellbore:
Plan: 3H-t0AL1-02 wp02(3H.13/3X.13AL1-02)
elaoiami
ro NS)Rnk .:
w .w Deets Rehm 8&3®7eww ((.13)
GEmmpany
Mmml
Cdehic, *b . M. Cu.
WELL DETAILS: 3H-13
+N/ -S +E/ -W Northing Easting Latitude Longitude
0.00 0.00 6000475.46 496655.42 70° 24'45.119 N 150° 0'39.419 W
Sec MD Inc Azi TVDSS +N/ -S +EAW Dleg TFace vsect Annotation
1 7430.00 89.32 48.89 5940.13 3094.19 -748.87 0.00 0.00 3094.19 TIP/K0P
2 7530.00 95.38 45.38 5936.04 3162.11 -675.68 7.00 -30.00 3162.11 Start 7 d15
3 7700.00 90.28 34.61 5927.63 3291.99 -566.78 7.00 -115.00 3291.99 3
4 8000.00 90.26 13.60 5926.19 3564.29 .444.95 7.00 -90.00 3564.29 4
5 8250.00 81.61 358.34 5944.00 3811.32 -418.92 7.00 -120.00 3811.32 5
6 8360.00 85.50 351.66 5956.36 3920.12 -428.46 7.00 -60.00 3920.12 6
7 8460.00 90.02 346.30 5960.27 4018.14 -447.55 7.00 -50.00 4018.14 7
8 8860.00 90.01 14.30 5960.16 4414.16 -445.47 7.00 90.00 4414.16 8
9 9200.00 85.20 350.97 5974.54 4751.06 -429.85 7.00 -102.00 4751.06 9
10 9450.00 89.87 7.85 5985.36 4999.84 -432.35 7.00 75.00 4999.84 10
11 9850.00 90.36 35.85 5984.55 5367.42 -284.96 7.00 89.00 5367.42 11
12 10000.00 90.35 25.35 5983.63 5496.35 -208.71 7.00 -90.00 5496.35 Planned TO at 10000.00
I
F`
Mean ;
c
West( -)/East(+) (500 us@/in)
5416
■■■■■■l�llIBM
■■■Emmi
l■■■■■■■■o■
■■■1
510
5510--
1■■■■■
■
FAIR
■
■■■1
;;1■■■■■■�fril■...■.NEI
605
5101.
1■■■■■
I
WE
.
NMI
1■■■
■�ii�l31M■■■■■■■1
5700
Q J
-i
1■■■■��■■■■■■
5795
Z
3H-1
/3H-1 AL
1■■■■■
■■■■■
5890
1■■■
ONE
■\1��A�■■�■■■■1
111■■■■■■■��r,:��■■■■■■■■■1
1■■■■■■
-I 3A
lA3
._.. --.
MH
3H."dat
0■■■■1
;
1■■■
up
MEMO
5
i;►��i�■■■■■■■■1
1■■■■■■■r�.�®■■■■1
6080
6 7 48
P
anngd lDul
1
11111"m
[ 7 d1
3H-1
8H-1 A
----------
H-13
LI -02
�■■
lll�llll!_■��■tl
West( -)/East(+) (500 us@/in)
5416
510
5510--
605
5101.
5700
Q J
-i
5795
Z
3H-1
/3H-1 AL
5890
]
-13 H
-I 3A
lA3
._.. --.
MH
3H."dat
5985
;
up
5
6080
6 7 48
P
anngd lDul
SI
[ 7 d1
3H-1
8H-1 A
H-131
H-13
LI -02
6175
6270
3
-13A
-02 F
u112
6365
ea L
vertical section at u.uu- (9S ustV]n)
1
KUP PROD
3H -13A
ConoeoPhllllp$
Well Attributes
Max Angie&MD JTD
AWska lrlC
wenw,c APuuwl seta N,me wenbore seas
nnl l'1 m01nKB1 Act elm lxkel
501032008901 KUPARUK RIVER UNIT PROD
5930 6,9]4.11 ],)550
Comment USE(Pind Gale
SSSV'. NIPPLE 250 412/2015
Mndatwn Cretale
Las(WC'. 116/1997
K KINJOl Rip NNmu DMe
3201 1/9/1988
314-13A6'2ROm541809PM
area scromac anu
gnnotation peIXn (flHel EnE Date gnnafalion
Last MOUBy End Date
Last Ta :SLIP ],624.0 9/16/2015 Rev
9
Reason: GLVC/O,TAG, H2S pproven 9/2912015
HANGE
as ng nags
T -7-n9 Dowiptmn OD (in) IDlintTop
CONDUCTOR 16
15062
PRE
36.0
6tt Cepin Ou'le
110.0
Sinoeptn lrvDl-. woLen P... ..Toprnreaa
1100 5250 H-40 WELDED
VmngD ription 00 (in, /Olin)
Top(MIN
Set pawn PKIR
Set TURK (ND1—wpLeo ll... Grade TopTN—
SURFACE 9518
8.921
35
.0 3.0]18
94 38.
29200155 BTC
was
Mae Dnactiptun OD do IDlin)
PROWCTION Post 7
62]6
Top (ana)
330
Sn Depth IflN81
5,970.0
Set DWIM1 pyM...ILen (I... Gm]e TOP
5,1]25 28.00155 BTC
IDrW
SR
Caingeeacxpnon US (in) do
(and
ToRIXKB)
Set Depth laKM
Sat Depth lrvolw11
... Len B...G�tl� Top
TK—d
LINER 31l
2.992
5,8084
],)550
9.30 NO BTCMOD
Liner Details
TOP PKlU 1,OVIlpMBI Topmdl'1
uem Des eom
rvo(iin) to
9n1
cOxOucioR:3e DnOO
5,8084 5,049.) 40501T
PACKER
AKER LINER TIEBACK SLEEVE wIBAKER G2
R LINER TOP PACKER
PRE
5.250
5,8223 5.060.3 I 0411 HANGER
BAKER HMC LINER HANGER
NIPPLE SOTS
5,829.1 50654 494] SBE
BAKER SEAL BORE EXTENSION
4000
Tubing Strings
GA6 LIFT: 212a.t
1n6mppewnpton Stdn9 Ma_. IO in) roplKKel Set OePm ld. set Depen lrv011 wglon0 erne rop connmmn
TUBING 31/2 2992 2)0 5,:3364 50)10 930 J-55 EUE 8rd
Completion Details
NwninallD
TOp(flKBI Top (TOM (ase) Topineir) Item Dc own (in)
27.0 27.0 0.16 HANGER McEvoy 3112' BOOM GEN III Tubing hanger w/155 Pup 2.992
EUE find top
501.5 5014 0.85 NIPPLE 312" Cameo DS'Nipp)e 4.59OD. 2.812"ID 2812
SURFACE MO-ZO718—
5,5029 5,045.5 4051 NIPPLE 3112" CAMCO V Nipple wl 2.759' No-GOPmBIe 2.50
5809.8 5.050.9 40.50 LOCATOR BAKER LOCATOR 3.000
GASUFT:4,1176
5,8120 5,052.4 40,50 SEAL AS MSY BAKER GBH SEAL ASSEMLY w/10'STROKE & 3000
SPECIAL LOCATOR TO STAB INTO LINER TIE -BACK
SLEEVE/PACKER
GASUFT:5p771
tither In Hole )Wireline retrievable plugs, valves, pumps, fish, etc.)
ToplrvDl
mP ma
TOP nKeI Inset
1'1 oea
Coen Run Oak ID pnl
5,946.0 5,1550
4106 NANDOW
SIDETRACK CASING WINDOW 1/61199] 6.000
Perforations & Slots
GASUFTE.n72
IPpt
TT
Top Ovid)
IND)
(Dem
i .
Top (I
wesqu g
MKB)
(it")
Lone
DM
D
Typo
Com
7,229.0
7,249.0
5.9273
59379 C4.
UNIT 8,
5/912002
4.0 RPERF
25' HSD, PJ DP ChgE
31HAM
60 deg ph
xIvPLE:5.m2.9
7,258.0
7,3080
5,9427
5,969.2 A-3,
A2,3H-
1121/199]
40 TrI
180 deg. phasing; 212'
13A
HSDCamer
),355.0
7,365.0
59944
5899.6 71,3H
-13A
8/252009
8.0 VE—RF
YHMXMillenium, 60
deg pH
LOCATOR.Eedi
].3]2.0
7,380.0
6.002.7
6,0913.9 A
-1. 3H -13A
8/2512009
6.0 APERF
Y' HMX MIIIenlum. 60
deg pH
Mandrel Inserts
6E4KSY:50120
M
atl
N Top laKB)
Top (ND)
(flKB)
Mahe
Model
OOlin)
6zw
Valve
TyPe
LNnn
Type
Pon Size
III
TRO Run
have
Run DMe
Co.
1 2.]20.1
2,851.1
Cam04
KBUG
1
GASLIFF
GLV
BK
0.156
1,3190
9/2512015
800
91132
015
2 4,1178
3.]44.0
US Do
BUG
1
GAS LIFT
GLV
BK
0.158
1.280.0
9252015
9:30
9/132
015
WINDOW;5948.0
J 5,077.1
4.4879
Cameo
KBUG
1
GAS LIFT
GLV
BK
0.188
1 ]030
9/2WO15
9:00
911312
015
PRODUCTION Fon Sa,
65,9]00
4 5,]5].2
50108
MCC
MMM
112
GASLIFF
OV
FW
0.188
00
9/292015
230
91
0155
Notes: General & Safety
Em oak Annotation
1/611997 NOTE'.WELL SIDETRACKED- ORIGINAL COMPLETION DATE IW1968
RPERFJ.SRI.D72ASO�
1/2012004 NOTE: WAIVERED WELL IAx OACOMMUNICATION
811612009 NOTE: TIGHT SPOT M 7260' -Tat 3'
'r129/2010 NOTE View Schematic w/Flasks SChematic)0
IPERR7.2M0I
APERE7.M6.D7,MSa—
APERF.7372D7.380.0—
LINER: SAM.4.7.7550
31-1-13A Proposed CTD Schematic
110' MD
', 36# J-55
at 3072' MD
icked at
MD (1997)
C -sand parts
7229-7249' MD
sand pads
7258'-7308' MD
7356'-7366' MD
7372'-7380' MD
L -BO liner
5808'-7755' MD
3-112" Camco DS -nipple at 502' MD (2.813" min ID)
3-1/2" 9.3# L-80 EUE find Tubing to surface
3-1/2" Camco KBUG gas lift mandrels 2720', 4118', 8 5077' MD
3-1/7' Camco MMM gas lift mandrel 5757' MD
3-1/2" Camoo D -nipple at 5803' MD (2.750" min ID)
Baker 3-1/2" GBH -22 seal assembly at 5812' MD (3" ID)
Liner too
Baker 5" x 7" ZXP liner top packer at 5808' MD
Baker 5" x 7" HMC liner hanger at 5822' MD
Baker SBE (12' length with 4" ID seal bore)
Landing collar at 7654' MD
Tightspotm 3-i/2"
liner 7268'-7313' MD
KOP at 7338' MD
Baker 3-1/2" XL
Monobore whipstock
3H-13AL1-03 wp03
TD @ 10,000' MD
Liner top at 7330' MD
3H-13AL1-02 wp02
TD @ 10,000' MD
Liner Billet at 7650' MD
3H-13AL1-01 wp01
TD @ 10,600' MD
Liner Billet @ 7430' MD
3H-13AL1 wp04
TD @ 10,600 MD
Liner Billet @ 7,750' MD
From: Hernno. Keith E
To: Boyer, David L (DOA)
Subject: FW: KRU 31-1-13A (PTD #196-197)
Date: Tuesday, October 23, 2018 1:21:47 PM
Attachments: imaae001.uno
3H-13AL1 wD04 MD - NAD27.hct
3H-13AL1-01 wo01 MD - NAD27.hct
3H-13AL1-02 wD02 MD - NAD27.txt
3H-13AL1-03 wD03 MD - NAD27.tM
Dave,
Please see the attached.
Thanks,
Keith Herring
CTD Engineer
907.263.4321 (Office)
907.570.2410 (Mobile)
700 G Street, ATO — 664
Kcith.F 11eDin��JconacoDhllbs can
ConocoPhillips
Alaska
From: Herring, Keith E
Sent: Tuesday, October 23, 2018 12:00 PM
To: Davies, Stephen F (DOA) <steve.davies@alaska.gov>
Subject: KRU 3H -13A (PTD #196-197)
Hi Steve,
Please see the attached text files for KRU 3H -13A.
Thanks,
Keith Herring
CTD Engineer
907.263.4321 (Office)
907.570.2410 (Mobile)
700 G Street, ATO — 664
Keith. F.I lerrin.0conocooh i I I ins.can
ConocoPhillips
Alaska
From: Boyer. David L (DOA)
To: "Keith.E Herrina(akop.com"
Cc: Davies Stephen F (DOAI; Loeoo Victoria T (DOAI
Subject: Digital Survey for KRU 3H-13AL1
Date: Tuesday, October 23, 2018 1:19:00 PM
Importance: High
Hi Keith,
Victoria just dropped off the PTD for KRU 3H-13AL1. Please e-mail a digital copy (Excel or ASCII
format) of the survey for this first lateral. We will be requesting the others later. This really speeds
up the review.
Thanks,
Dave Boyer
AOGCC
TRANSMITTAL LETTER CHECKLIST
WELL NAME: K Q LA, —3H — 1.3A L 1 — C)p` s
PTD: 2113-137—
evelopment _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: POOL: K LA p a rGt- 1< 011
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
/
LATERAL
No. 194— 19'x, API No. 50- 103 aon A9 �.
v
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
_-� from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
sam les are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well tesdag program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
1/
(Companv Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
V
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100
PTD#:2181370 Company CONOCOPHILLIPS ALASKA INC Initial Class/Type
Well Name: KUPARUK RIV UNIT 311=13ALLQ2--___..Program DEy__— Well bore seg
_DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑
Administration
17
Nonconven. gas conforms to AS31,05.0306. 1.A)&Q2.A-D) - - - - - - - - - - - - - - - -
NA
- _ - - - _ - - - - - -
1
Permit fee attached... - - - - - - - - - - - . - - - - ....
NA
2
Lease number appropriate- - - - - - - - - - - - - - - - - - - -
Yes
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3
Unique well name and number - - - - - - -
Yes
- - - - - -
4
Well located in a defined pool- - - - ........ - - - - - _ -
Yes
5
Well located proper distance from drilling unit boundary- - - - _ - - - ........
Yes
6
Well located proper distance from other wells - - - . ... - - - - - - .
Yes
- - - - - - - - - - -
7
Sufficient acreage available indrillingunit - - - - - - - - - - - - -
Yes
- - - - - - - - - - - -
l8
If deviated, is wellbore plat. included - ----- - - - - - - - - - - .. - - - - - - - - .
No
- _ Directional. plan view is included. -
I9
Operator only affected part. - - - - ........... . . . . .........
Yes
- - - - -
10
Operator has. appropriate bond in force- - - - - -
----------
Yes
.. ..
Appr Date
11
Permit can be issued without conservation order- - - ..... - ... - - - -
Yes
- - - - - - - - - - - -
12
Permit can be issued without administrativeapproval_ ... - -
Yes
- - - - - - - - - -
DLB 10/24/2018
13
Can permit be approved before 15 -day wait - - - . . . . . . .........
Yes
........ ......
14
Well located within area and strata authorized by Injection Order # (put IO# in- comments) (For
NA
- -
15
All wells. within 1/4 mile area of review identified (For service well only)- _ - - - - - - - -
NA
- - - -
16
Pre -produced injector; duration of pre production less than 3 months. (For service well only)
NA
18
Conductor string. provided - - - - - - - -------- - - - - - - - - - - - -
NA
- Conductor setfor KRU. 311-13
Engineering
19
Surface casingprotects all -known USDWs . . . . .. . .. . . . . . .....
NA
Surface casing set for KRU 3Hr13
20
CMT vol adequate to circulate. on conductor & surf_csg ------- - - - - - - - - - - - - -
NA
Surface casing set and fully cemented - - - -
21
CMT vol adequate to tie-in long string to. surf csg- _ - - --- - - - - - - - - - -
NA
- - - - - - - - - -
22
CMT. will coverall known productive horizons - - - - - .. - - .....
No.....
Productive interval will be completed with uncemented slotted liner
23
Casing designs adequate for C.. T, B &_ permafrost. - - _ -
Yes
- -
24
Adequate tankage or reserve pit - - - - .......
Yes
Rig has steel tanks; all waste. to approved disposal wells
25
If a re -drill, has a 10-403 for abandonment been approved - - - - - - - - - - - - -
NA
- - - - - - - - - - - - - - -
26
Adequate wellbore separation proposed - -
Yes
Anti -collision analysis complete; no major risk failures -
27
If.diverter required, does it meet regulations - _ - .. - - - -
NA
Appr Date
28
Drilling fluid program schematic .& equip list adequate. - - - - - -
Yes
Max formation pressure if 4897 psig(15,5.ppg EMW ); will drill w/ 8.6 ppg EMW. and maintain overbal w/ MPD..
VTL 10/31/2018
29
BOPEs,.do they meet regulation - - - - - - - - - - - - - - - - - -
Yes
30
BOPE.press rating appropriate; test to.(put prig in comments)-- - - - - - - - - - - -
Yes
MPSP is 4299 psig;w ill test BOPS to 4800.psig - - - - - -
31
Choke. manifold complies w/API. RP -53 (May 84) - - ... - - - -
Yes
- - - - - - - - - - - - -
32
Work will occur without operation shutdown.. - - - - - - - - . -
Yes -
- - - - - - - - - - - - - - - -
33
is presence of H2S gas probable - - - - - - - - -- - - - - - - - - - - - . ...
Yes
H2S measures required....
34
Mechanical. condition of wells within AOR verified (Foc service well only) . . . . . . . .. . .....NA
-
.. - - - . - .........
35
Permit can be issued w/o hydrogen sulfide measures - - - - - - - - - - - -
No
3H -Pad wells are H2$cbearing.-H2S. measures are required,
Geology
36
Datapresentedon potential overpressure zones.. - ....... - - -
Yes -
- - - - - - - - - - - - - - -
Appr Date
37
Seismic analysis of shallow gas zones - - - - - - -
NA
- - - - - - - - -
DLB 10/24/2018
38
Seabed condition survey (if off -shore) _ - . - - - - ...... -
NA
- - - - - - - - - - - - - - - - - - - - -
39
Contact name/phone for weekly -progress reports (exploratory only] _ -
NA -
- . . .. . . . . . . . . . ........ .
Geologic Date: Engineering Date Public Date
Commissioner: Commissioner: Commissioner