Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-129DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2181290 Well Name/No. HANSEN 1-1-04-1-03 Operator Bluecrest Alaska Operating LLC API No. 50-231-20064-62-00 MD 19017 TVD 6725 Completion Date 3/22/2019 Completion Status 1-0IL Current Status 1-0I1- UIC No REQUIRED INFORMATION v CG I� Mud Log Ws-fp p��`.p� Samples .No Directional Survey Yes • -J DATA INFORMATION List of Logs Obtained: GR/Res/DEN/Neu/PWD rv"-d" / (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OKI Type Med/Frmt Number Name Scale Media - - - No Start Stop CN Received Comments ED C 30742 Digital Data 16801 19050 5/10/2019 Electronic Data Set, Filename: 1-104-1-03.1as ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors --AM 02-01-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-02-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-03-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-04-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-05-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-06-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-07-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: Hansen H04 Nabors AM Report 02-08-2019.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04-L03.dbf ED C 30742 Digital Data 5/10/2019 Electronic File: h04-103.hdr ED C 30742 Digital Data 5/10/2019 Electronic File: H04-L03.mdx ED C 30742 Digital Data 5/10/2019 Electronic File: h04-LO3r.dbf ED C 30742 Digital Data 5/10/2019 Electronic File: h04-L03r.mdx ED C 30742 Digital Data 5/10/2019 Electronic File: 1104-1-03_SCL.DBF ED C 30742 Digital Data 5/10/2019 Electronic File: H04 -L03 SCL.MDX AOGCC Page[ of4 Monday, July 1, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2151290 Well Name/No. HANSEN H-04-1-03 Operator Bluecrest Alaska Operating LLC API No. 50-231-20064-62-00 MD 19017 TVD 6725 Completion Date 3/22/2019 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03_TVD.DBF ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03_TVD.mdx ED C 30742 Digital Data 5/10/2019 Electronic File: BLUE CREST ENERGY H-04 FINAL REPORT.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 - Drilling Dynamics Log MD.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04 -L03 - Formation Log MD.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 - Gas Ratio Log MD.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: 1104-1-03 - LW D Combo Log MD.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 - Drilling Dynamics Log MD.tif ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 - Formation Log MD.tif ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1-03 - Gas Ratio Log MD.tif ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 - LWD Combo Log MD.tif ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 Show Report #1 17640- 17900. pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 Show Report #1 17640- 17900.x1sm ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 Show Report #2 18430- 18713.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: 1104-1-03 Show Report #2 18430- 18713.xlsm ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 Show Report #3 18770- 19010.pdf ED C 30742 Digital Data 5/10/2019 Electronic File: H04-1_03 Show Report #3 18770- 19010.xlsm Log C 30742 Log Header Scans 0 0 2181290 HANSEN H-04-103 LOG HEADERS ED C 30911 Digital Data 16823 18981 6/21/2019 Electronic Data Set, Filename: BlueCrest_H04- L03_EcoScope lmages_RM_LAS.Ias ED C 30911 Digital Data 16794 19016 6/21/2019 Electronic Data Set, Filename: BlueCrest_H04- L03_EcoScope_RM_LAS.Ias ED C 30911 Digital Data 6/21/2019 Electronic File: BlueCrest_H04-L03_EcoScope Images_ RM_DLIS.dlis AOC,('(' Page 2 o1'4 Monday, July I, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2181290 Well Name/No. HANSEN H -04-L03 Operator Sluecrest Alaska Operating LLC API No. 50-231-20064-62-00 MD 19017 TVD 6725 Completion Date 3/22/2019 Completion Status 1 -OIL Current Status 1 -OIL UIC No ED C 30911 Digital Data 621/2019 Electronic File: BlueCrest_1-104- L03_EcoScope_RM_OLI S.dlis ED C 30911 Digital Data 6/21/2019 Electronic File: BlueCrest H04- L03_EcoScope_2in_RM_16860-19017ftMD. Pdf ED C 30911 Digital Data 6/21/2019 Electronic File: BlueCrest H04- L03_EcoScope_2in_R M_InvertTVD. PDF ED C 30911 Digital Data 6/21/2019 Electronic File: BlueCrest_H04- 1-03_EcoScope5in_RM_16860-19017ftMD. Pdf ED C 30911 Digital Data 621/2019 Electronic File: BlueCrest_H04- L03_Ec0Scope_5in_RM_I nvertTVD. Pdf ED C 30911 Digital Data 6/21/2019 Electronic File: BlueCrest H04- L03_EcoScope_I mage_51n_R M_16860- 19017ftMD.Pdf ED C 30911 Digital Data 6/21/2019 Electronic File: 1-104-1-03_Surveys to surface_final.pdf ED C 30911 Digital Data 6/21/2019 Electronic File: 1-104-1-03_Surveys to surface_final.xlsx Log C 30911 Log Header Scans 0 0 2181290 HANSEN H-04-1-03 LOG HEADERS ED C 30911 Digital Data 0 0 1-104-1-03 ASP Final Survey PDF ED C 30911 Digital Data 0 0 1-104-1-03 ASP Final Survey Excel Well Cores/Samples Information: - - - - - - - Sample Interval Set Name Start Stop Sent Received Number Comments Cuttings 17690 19017 3/26/2019 1706 INFORMATION RECEIVED -- Completion Report Yv Directional / Inclination Data Mud Logs, Image Files, Digital Data fl NA Core Chips Y 12A Production Test Informatior )/ NA Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files Core Photographs Y / A Geologic Markers/Tops V Daily Operations Summary Cuttings Samples Y NA Laboratory Analyses Y eA COMPLIANCE HISTORY Completion Date: 3/22/2019 AOGCC Page 3 of 4 Monday, July 1, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/112019 Permit to Drill 2181290 Well Name/No. HANSEN H -04-L03 Operator Bluecrest Alaska Operating LLC MD 19017 TVD 6725 Completion Date 3/22/2019 Completion Status 1-0I1 Current Status 1-011- Release -OILRelease Date: 11/19/2018 Description Date Comments Comments: Compliance Reviewed By: , API No. 50-231-20064-62-00 UIC No Date: —7/ / I A0GC( Page 4 of'4 Monday, July I, 2019 21 8129r -Z,1` --'C, , 3091 _Ei'i" [.)f1 'Ichlumbergep� Transmittal #: 26JUN19-SP01 � 10/ L.rDrilling & Measurements I ` 03 Product Delivery Customer BlueCrest Energy, LLC Dispatched To: AOGCC: Meredith Guhl Well No H04 -- 1-104-1-07 Date Dispatched: 26 -Jun -19 Service Order # 18AKA0054 Dispatched By: Stephanie Pacillo Product Description Hardcopy Digital Copy Logging Date Color Log Prints: N/A Contents on CD 24 -Feb -19 EcoScope* 5" MD X 2" MD x 5" Invert TVD X 2" Invert TVD X 5" EcoScope Image X Digital Data N/A Contents on CD Recorded Mode DLIS / LAS Data X Survey N/A Contents on CD Directional Survey Nad27 X .,"Updated Definitive Survey` EOW CD 1 Contents on CD Data: DLIS/ LAS X Graphics: PDF X '"'Survey: XLS/PDF X Please sign and email a copy to: Please sign nd em it a copy to: abuchanan bluecrest n4qv.com AlaskaPTS rintCen r slb.com Attn: Andrew Buchanan Attn: Stephan�e Pacillo Received By: Schlumberger -Private 218129 30911 218129 131ue,cl est Energy BlueCrest Alaska Operating LLC 3301 C Street, Suite 202 Anchorage, AK 99503 Tel: (907) 754-9550 Fax: (907) 677-0204 FIECEIVED MAY 10 2019 Transmittal AOGCC 3074 Today's Date: 5/10/2019 Final Well Data for Well Transmittal #: 2019-08 To: Ms. Meredith Guhl Final Well Data for Well From: Andrew Buchanan Company: ; AOGCC Re: Final Well Data Final Well Data for Well Company: Well: BlueCrest Alaska Operating LLC H04 CD's contain the Final Well Data for H04: Final Well Data for Well H04 Main Final Well Data for Well H04 1-01 Final Well Data for Well H04 L02 Final Well Data for Well H04 L03 Final Well Data for Well H04 L04 Final Well Data for Well H04 LOS Final Well Data for Well H04 L06 Final Well Data for Well H04 L07 Regards Andrew Buchanan BlueCrest Energy STATE OF ALASKA I MAY 0 9 2019 ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT A 1a. Well Status: Oil Q Gas ❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended LJ 1b. Well Class: 20MC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 2. Operator Name: 6. Date Comp., Susp., or BlueCrest Alaska Operating LLC Comp: 3/22/2019 Development Q Exploratory E] Service ❑ Stratigraphic Test ❑ 14. Permit to Drill Number / Sundry: 218-129 3. Address: 7. Date Spudded: 15. API Number: 3301 "C" Street, Suite 202, Anchorage, AK 99503 12/27/2018 50-231-20064-62-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 2089' FSL, 1541' FEL, Sec 2, T4S, R15W, SM 2/3/2019 L03 H04 L03 Top of Productive Interval: 1456' FSL, 5236' FEL, Sec 33, T3S, R15W, SM Total Depth: 2175' FSL, 982' FEL, Sec 32, T3S, R15W, SM 9. Ref Elevations: KB: 180.5 • GL:145.8 ¢jP1:141.4 • 17. Field / Pool(s): Hansen,Undefined Cosmopolitan Oil 10. Plug Back Depth MD/TVD: 19017' MD / 6725' TVD 18. Property DIsignation: - Fee Hansen,ADL18790,ADL 384403 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 168804 rsy��, may- 2144597.65 Zone- 4 19017' MD / 6725' TVD LOCI 14-007 TPI: x- t5489B95- *ef y- 2149580.21 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- 153688.88 y- 2150327.54 Zone- 4 488' MD / 488' TVD N/A 5. Directional or Inclination Survey: Yes � (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) • 17,690' MD / 7117' TVD KOP L03 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary ALL LOGS WERE SLB LWD: GR-Res--Den-Neu-PWD Final Mudlogging Report / Mud Log / Lithology Log (Nabors-CanRig) Formation Log / LWD Combo Log / Gas Ratio Log / Drilling Dynamics Log 23• CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD CASING AMOUNT FT TOP BOTTOM TOP BOTTOM PULLED 20 0.500" wall A525 41 115.5 41 115.5 Driven N/A - Rotary Drilled/Driven N/A 13.375 72 L-80 40.5 5800 40.5 3593 17.5" 787 bbls Lead / 176 bbls Tail N/A 9.625 47 P-110 37.8 15406 37.8 7055 12.25" 139 bbls 15.8 ppg G -Tail N/A 4.5 15.2 P-110 15211 20864 6988 7127 8.5" Slotted Liner - no cement N/A 3.5 9.3 L80 1 10.61 15246 10.61 6988 N/A Production Tubing String WA 24. Open to production or injection? Yes Q No 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): Well completed with 4-1/2" slotted liner in mainbore; see attached lower liner SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3.5" 15246' MD 15211' MD / 6988' TVD tally for set depths and details. There are no perforations since a slotted liner was run in the well. L03 is completed as a barefoot lateral with KOP of 17690' MD (7117' TVD) and TO of 19017' MD (6725' TVD). Production from fishbone laterals drains into slotted liner in mainbore. • COMPLETION D T 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes No Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED ZZ 2011 N/A N/A V" FIED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): 3/25/2019 as lifted 3/25/2019 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: (ff v Choke Size: Gas -Oil Ratio: 12 hours Test Period 100' L, 6 c+ 160N61 60,0660 � 37 1500 Flaw Tubing Press. R110 Casing Press: 1575 Calculated 24 -Hour Rate Oil -Bbl: 1200 Gas -MPF: 6 Water -Bbl: 15 10il Gravity - API (torr): 27 Form 10-407 Revised 5/2017 S -/(n - CONTINUED ON PAGE 2 RBDMSJ.L'_- MAY 0 9 2019 Submit ORIGINIAL onl 1iflo * PtB5/z+t111 28. CORE DATA Conventional Co_,$): Yes ❑ No✓ ❑ Sidewall Cores: !es ❑ No ❑✓ If Yes, list formations and intervals cored (MU/I VD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. N/A 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑✓ If yes, list intervals and formations tested, briefly summarizing test results. Hemlock 18287 7013 • Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. TPI (matches 4a & 4b) 17,690 7.117 BPI (TD) 19,017 6,725 Formation at total depth: JHemlock 31. List of Attachments: Operations Summary, Actual Wellbore Diagram, List of Formation Tops, Mud Wt vs. Depth Data, Final Definitive Directional Surveys, Slotted Liner String Tally (4-1/2"), Tubing String Tally (3-1/2"), Wellhead & Tree Schematic, Pressure Test Results Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Andrew Buchanan Contact Name: Tom McKay Authorized Title: Vice Preside Alaska Operations Contact Email: tom mckav(&bluecrestenercv com Authorized r q Contact Phone: 907-7549566 Signature: J — 17 Date: INSTRUCTIONS General: This forth and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only IIne est Energy 3301 C Street, Suite 202, Anchorage, AK 99503 Thomas McKay, PE Phone: (907) 754-9566 Email: tom.mckay@bluecrestenergy.com April 9, 2019 Alaska Oil and Gas Conservation Commission 333 West 7`h Avenue, Suite 100 Anchorage, Alaska 99501 Cosmopolitan Project RE: Well Completion Report Form 10-407: Horizontal / Multilateral "Fishbone" Production Well H04 Rev 1 Lateral L03 PTD No. 218-129 API No. 50-231-20064-62-00 Dear Commissioners, BlueCrest Alaska Operating LLC hereby submits a completed Form 10-407 Well Completion Report with Attachments for the onshore horizontal / multilateral production well H04 Rev 1 Lateral L03. This well was drilled and completed using BlueCrest Rig #1. The well is currently undergoing an extended flow test on gas lift after installing the 4-1/2" slotted liner completion. Note that the flow test results, etc., as per AOGCC request, will be covered under a subsequent 10-407 package, along with other required well production tests and reports. Please find attached for the review of the Commission, the completed Form 10-407, and the information required by 20 ACC 25.070 for this wellbore, covering the drilling and completion of the "fishbone" multilateral, and the running of the upper 3-1/2" tubing string. If you have any questions or require further information, please do not hesitate to contact Tom McKay at 907-754-9566 (office phone). Sincerely, ;47 Larry Burgess Alaska Manager BlueCrest Energy Alaska nue est Energy H04 Rev 1 — Lateral L03 Form 10-407 Well Completion Report List of Attachments Cosmopolitan Project AOGCC Item No. Description A Cover Letter w/ Attachment Headers 1 AOGCC Form 10-407 Well Completion Report (2 pages) 2 Operations Summary (Daily Running Summary / Recap) 3 Actual Wellbore Schematic (as Completed) 4 Detailed List of Formation Tops / Geologic Markers (Box 29) 5 Mud Weight vs Depth Data 6 Definitive Wellbore Survey (Directional Survey) H-04 As Built Schematic 4-3-2019 l2ue Hole i ED&V 6�:0.50" Wall A252 Conductor @ 1 i +/-187'MD/TVD 1 � i TRMAXX-5E SCSSV @ 486 MD 1' Rig 1 RK8: 34.65' H -16A Elevation: 145.8' KB to MSL: 180,46' 1. 17 %" Hole , 13-3/8" 72# L-80 BTC Casing @ +/- 4195' MD 3-/V' 9.3# L-80 Tubing — GLM 3 w/ IPO Valve @ 4,696 MD, 3,197' TVD —XNlpple2@ 5,097'MD,3,340'TVD GLM 2 wl IPO Valve @ 10.661' MD, 5,WWO 12-'/." Hole 13,596'MD,6,409' TVD �- Locator Seal Assembly@ 15,207- MD GLM 1 w/ 114" OrtBce Valve / a14,288'MD,6,656'TWD SGMw/DHGauge @ 8 1/2" Hole L-01 102 LOi Lyd 9-5/8"53.5#P-110 Casin B KOP1a,OR MO KOP[g800'MO KOP t],BBO'MD ft.11bdM'MD KOP 1B.33V MD L -OB =0311- �] TO 1],t00'MO TO tN2WMO TO 1BAt]'MO TO 20ABa'MD To 16,7M'MD KW Mo KOP 20.620- Me @15,406 MD +/-7,055'TVD TO 21f5a•MD TO ztaea•MD I UA58'MD. 1dA58'MD, 6,717' WD KoP 1614]. MD j TD 16,41'Me Five J.1pA A ,. Rapmbly OLIN Chemical Injection Sub@ ,:.: ,..�. .. 13,596'MD,6,409' TVD �- Locator Seal Assembly@ 15,207- MD GLM 1 w/ 114" OrtBce Valve / a14,288'MD,6,656'TWD SGMw/DHGauge @ 8 1/2" Hole 15,116' MD, 6,952' TVD 4'/2" 15.2# L-80 TSH -563 Slatted / Blank Liner Prepared By D. Ross 4.3-19 T. McKay, 22March2019 H04 Lower Lateral ACTUAL 20 Conductor Completion with Slotted Liner in to beset @82' Mainbore and Seven (7) Open Hole BGL Fishbone Ribs Ilu es It 13-3/8" 72# L80 Energy BTC @ 5800' MD 3-54" 9.3# IST -MOD Production Tubing 4-54" x 9-5/8" Liner Hanger & Liner Top Packer 9-5/8" 47.0# P110 H563 @ 15406' MD Fishbone ribs are 8-%" open holes spaced approx every 800' with 4-54" slotted liner run in the mainbore after the seven ribs were drilled; ribs were drilled in order from LO3 to L07 using open hole sidetracks to initiate each rib; ribs penetrate all layers of Starichkof and Hemlock pay sands LOS L02 L03 L04 L05 L06 L07 4-54" 15.2# H563 Slotted Liner @ 20867' MD H-04 Formation Tops SSTVD MD ND H-04 Add -180.5' Beluga -1978.18 2330 2158.68 Upper Tyonek A -3308.35 5510 3488.85 Lower Tyonek -6020.31 13024 6200.81 Starichkof -6853.97 15342 7034.47 Hemlock -6945.3 16786 7125.8 H-04-1-01 Starichkof -6631.02 17158 6811.52 H -04-L02 Hemlock -6904.77 17179 7085.27 Starichkof -6544.78 18186 6725.28 H-04-1-03 Hemlock -6832.52 18287 7013.02 H -04-L04 Hemlock -6800.62 19146 6981.12 Starichkof -6485.96 19922 6666.46 H-04-1-05 Hemlock -6791.27 20028j 6971.77 Starichkof -6510.86 20697 6691.36 H-04-1-06 Hemlock -6823.52 20671 7004.02 Starichkof -6569.83 21320 6750.33 H-04-1-07 Hemlock -6885.621 21308 7066.12 Starichkof -6651.921 219321 6832.42 WeIIView Well Name: H04 BC - Daily Recap Dally Operations Rpt0 start nate EM DeIe S�mg,. 36 0 1/20/2019 1121/2019 - Back ream out of hole Fit 1,217 TI 8,400' as per K&M instructions - I0001gpm - 3500/psi - RPm/140 - ax gas 285 units -110-150 back ground gas - Back ream one stand slowly to allow shakers to dean up F18,400' T 8,319- Continue back reaming F/ 8.310'; 718,700' as per D&M instructions -1000/gpm - 3250Ipsi - RPW140 - 1210lorque - ECD 11.06 - Max gas 183 units - Started packing off C 6,633'- Slacked off to 6,702'and worked pipe @ 2 FtM1in until shakers cleaned up - Back reamed out of hole F/6,812' T/ 5,920' (ID 5 -15 FUMln as hole dictated -1000/gpm - 4250/psi - RPM/140 - 7-10k/Torque - String Wt 150k - Max gas 183 units - ECD 10.91 ppg - Stopped r@ 5,920' and took strings Wls, PIU Wt 170k - SIO Wt 130k - Rot Wt 150k - Began pulling BHA through shoe @ 100/gpm & 180/psi F15,920' Tl 5,818' - Hole packed off with 20k overfull and pressured up to 570 psi - Stopped pump and slacked string to 5,950'- Circulated and reciprocated pipe F/5,950' T/5,910 @ 1000/9pm - 2800/psi - Pulled BHA Into casing F/6,910' T/ 5,778' no problems - Performed clean up cycles 390 121/2019 1122/2019 - Performed clean up cycle, rack back one stand each bottoms up to 5,305'- 11000gpm - 2760 psi - 120 RPM - 8k Torque - Flow checked 15 minutes - Blew down mud line and top drive - Fill trip tank - Clean rig floor - Cul and slip 110' of drilling line - Monitor well on Trip tank - 12 bb./hr losses - Service rig - Pumped dry job, blow down lines and TO - POOH on elevators F/ 5305' T/ 3,863'- ObservedlOk overpull and trending upwards to 20k Q 3,900' - Make up top drive and RIH to 3,996 - upon establishing circulation,observed packoff - Worked pipe and established full circulation and rotary - Reamed into hole T/ 4,182'- Back reamed out of hole r/ 4,182' Tl 1,837'0 20 FUMin as per K&M instructions - 1000 gpm - 1800 psi - RPM 120 - String Wt 130k - Circulate and reciprocate pipe F/ 1,83T T/ 1,746' ® 5 Ft/Min - 1000 gpm - 2000 psi -120 RPM - 4k Torque - Circulated bottoms up x6 -Back reamed F/ 1,746TINS @ 20 FNMin 1000 ppm -1800 psi - RPM 120 - POOH on elevators to 340'- PJSM - Lay down BHA with crane assist- Monhor well on trip tank 40.0 1122/2019 1232019 - Lay down BHA with crane assist - Clear floor of all BHA tools and equipment - B ng casing tools and equipment to rig floor with crane - Monitor well on Trip tank - Drain stack, dosed blinds and charged top rams to 9 518', changed wash pipe to Chevron style - Monitored well on Trip tank - Make up test joint, xo. and wear bushing running tool and retrieved wear bushing - Set test plug, filled stack and lines with water and tested rams 205/3500 for 5 minutes - Rigged down test equipment, removed test joint and plug - Changed out drilling bales and elevators to casing bales and elevators - Safety meeting with crews - Run 9 618" casing with Volant tool - Tenons inspecting threads and GBR confirming torque with torque graph - Rlling pipe on the fly and topping off every 20 joints 41.0 1232019 1242019 Run 9.625" 470 P110 HYD 563 casing. From joint #62 to # 258. Filling each joint, top off every 20 joints. Good metal displacement. 42.0 1242019 1/252019 Run 9.625" 47# P110 HYD 563 casing. From joint #256 to # 338. Filling each joint, top off every 20 joints. Good metal displacement. Land hanger on depth. Shoe @ 15406'. Circulate and condition mud system, wellbore. Rig up camenters. MU plug launcher and hardline, SLB loaded Imes with 5 bbls water and checked for leaks. SLB pressure tested lines at 300 low 3500 high, good tests. Dropped first plug. Rig pumped 98 bbls 13 ppg MudPush If at 4 bpm and shut down. SLB dropped 2nd bottom plug and pumped 139.3 bbls (678 sx) 15.8 ppg Class G cement at 3.5 bpm.SLB dropped top plug, then displaced with 10 bbls water. The rig pumped 10 BBLS 13 ppg MP2 with no fiber ® 4 BPM 400 psi, followed by 1105 BBLS 10.5 PPG OBM. Slowed to 3 bpm with 40 bbl to go. (Rig pumped 12.068 strokes) Pumped hell the shoe track. Did not bump the plug. Held 400 psi (FCP of 680 psi) for 5 minutes, bled off and floats held. Bled back 114 bbl Into trash can on rig floor. Mbit water temp at 70 deg. Pumped 50% excess. Did not attempt to reciprocate the shing.CIP at 21:54 Ins, 01-24-2019. RD and released Schlumberger. 43.0 1252019 1262019 Lay down landing joint. EVenge out casing bales and elevators to drilling bales and a evators. PIU a stand, make up rimming tool to pack off. Set pack off in well head profile. LLDS. Test to 5000, 10 mins. good. Strap & tally 210 JTS 5")(T50 DP with pre -instated W WT super sliders, pick up via mousehoie and stand back. Cleaning pits, transfer 891 BBLS 10.5 ppg OBM to mud plant for centrifuging and storage in uprights 14,16,20. Change out casing rams to VBR's In upper pipe ram. M.0 1/262019 12712019 Change out top pipe rams to VSR's (3.5"x 5.5'). Change out washpipe on top m vron e e to Mechanical. Clean pits in active system and reserve module. Rig up to test ROPE. Test with State witness. One faillpass, miscellaneous sensor went flat. Rig down teat equipment. PJSM: PIU BHA#5 with Cruz crane assist. 450 1/27/2019 1282019 TIH with BHA#5 to 2530' MD. Test MWD tools. TIH to 8765' MD. crew change. TIH to 15209. Tag up on cement stringers. Stage pumps up to 465 GPM, 2400 PSI, Ream down to 15283'. One joint above float collar. Circulate and condition to achieve even MW infout. Rig up test casing to 3500 PSI. 30 mins. Charted. Begin drilling shoe track. 112912019 Drill shoe track, and cleanout to TD of 12Y:' ho . 16420'. CBU. Clean pits 1,5. Displaceout 10.5 ppg OBM with 9.4 ppg MOSM. Clean pits, build volume. Drill 20 feet of brew hole. CBU. Perforin FIT to 13.5 PPG EMW. Build volume. 47.0 1129/201§— 1 19 a volume of 9.4 ppg CsCO3. Build base mud in Mud plant, ship to reserve module, add Megamul emulsifier, w ' t up to 9.4 ppg, ship 280 BBLS to ac5ve. Fill shaker pits. Drill 8X" hole from 1544W to 16,828' M LOt 48.0 I1301 U-3-1120115 Directional call EN'production hole L01 from 16,828'to 17,200. BROOK Install 48 NRDPP on stands 1 to 181. Open no detrack 1_01 back Into Mother bore @ 16,060' drill 90" tangent to 16,455' MD. 49. 11311 019 12019 Directional dniljLWrom 16,455' to . 615 GPM, 2700 PP, 25k TO, 160 RPM, 280k Up Wt, 120k On WL 200k Rot W171 1.9 ECD, 9.5 PPG MW. www.peloton.com Page 61110 Report Printed: 312012018 WeIlView" Well Name: H04 BC - Daily Recap Dalry operations RO# Built Mui En40aui a,yltpner. 50.0 019 BROOH to 16W. Trench1 to n to 17620. Begin mL03 1 . Drill L03 to 17,95T MD. 51.0 212/2019 21312 tit Direc[bnal dril 8' "hole with rotary steers system from 17957' l0 19,017'. Lost 1b B LS In 4 mhre, 5 BPH. Slowed pumps tlown. Staged pumps Dark to 400 GPM. 25 BPH loss rate. Pump 50 BBLS LCM, 30NBBL, slowetl bsses to 12 BPH. BROOH to 18,625. Placing NRDPP on each stand coming out 52.0 2/312 1 42 19 ervice Rig. BR H rom 18625'to 17,310' MD. Repair top drive, cylinder an compensator. Pumping 350 GPM, well static. Complete repeirjob. BROOH from 17,310' to 15,354' MD. Inside casing. 53 U 29/2019 2152019 BR H m 15354' to 14849'. Ademnpl to pull on elevators om 148491014655, tlreg inveasetl 35k, would not break over. Continue BROOH from 14,655'to 8100' MD. Good hole fill. Well static. Some of the X754 will have to be laltl down. 54.0 2/512019 2/8/2019 BR H from 8100' to 7081'. P Hon elevators to the HA Lsy own BHA with vane assist. Bra dean rig floor, adjust Baylor brake, hang two SLR's In derrick. TIH w125 Bids. 5" DP, Prepare to come out side ways. Wom hard banding. 55.0 2/8/2019 217/2019 - PJSM - Lay down 5" DP - assist W WT with removal o NRDPPs on each joint, dean each joint with passing of sponge ball with Magtec Vac assist - Repair alignment of pipe skate and beaver slide with shims - Lay down 5" DP(total 75 jnts), Monitor well on trip tank - Remove XOs from TD, change Inserts on elevators to 5.5*'- RIH with 51 stands of 5.5" DP - Service Rig - POOH laying down 153 joints of 5.5" DP cleaning pipe in pipe shed with sponge ball with Magtec Vac Truck assist- RIH with 41 Stands 5.5" DP from derrick - POOH 11 Stands inspecting with Premium - Continue POOH laying down 5.5" DP and cleaning in pipe shed with sponge and Magtec Vac Truck assistance 56 0 - 217 19 2/8/2019 - PJSM - POOH and layed down 71 joints of 5.5" XT -54 DP(total 249 XT -54 ). - Washed each joint In mouse hole and cleaned Inside of joints with sponge ball using Magtec Vac Truck In pipe shed - Cleaned rig floor - Prepared test tools, removed wear bushing, and Installed test plug - Tested BOPE with 5" & 5.5" DP 250/3500 psi low/high for 5 minutes - Performed accumulator draw down test and check Nitrogen x 6 bottles Q 2400 psi - Removed test plug and installed wear bushing, iayed down test equipment - Placed tree into cellar with crane - PJSM with vane crew and picked up BHA 116 to 161' - Cleaned rig floor and readied tools for picking up 5" XT -50 DP - RIH picking up (75) joints at 5" XT -50 DP to 2,530' monitoring well on trip tank - Filled pipe every 20 stands - ( Performed shallow test with Directional tools C 1,774', good test) - Serviced rig - RIH with 5" XT -50 DP from derrick removing NRDPPs to 2,721' monitoring well on Trip tank 57.0 2/82019 2/9/2019 - PJ M - RIH with 5" XT50 DID from der Ick removing all NRDPP- nom each sta 2,721' TI 8,800, monitoring displacement on trip tank and filling every 20 stands - Service Rig - CIO elevator Inserts to 5.5" and RIH picking up 5.5" HT -55 DP from pipe shell F/ 6,800' T/ 13.824', drifting each joint - Monitor well on trip tank and filling pipe every 20 stands ( NRDPPs were installed before picking up DP on pipe racks and pipe shed as per pre -job plan of placement depths ) - RIH picking up (36) joints of5.5" XT -54 F/ 13,624'T/ 14,755' monitoring well on trip tank - Fill pipe every 20 stands - RIH with 5.5" XT -54 DP from derrick F/ 14,755'T/ 15,315' monitoring displacement on Dip tank - Circulate and condition until Mud Wt iNoul the same, 9.5 ppg - Hang blocks - Slip and cul drilling line 58.0 2/9/2019 2/102019 - aired hydreulie line cutter - Monitored well on hip tank - tit and slipped 00' of drilling line - Tightened dead man damp, Installed drawworks guard, installed SMhook load sensor - Celibreled Rigminder block height and bee ad staving wrap on drum was not propedy $eatad - Unspooled wraps on drum and respooled q( -Calibrated RigmInder block he and SLM hook ball sensor - Monitored well on trip tank - Perfonmatl Mad Pass and wnormed depth co to be cerred and all smart rods fundloning property - RIH F115,472' Tl 17,570' - Filled pipe every 10 stands -SOW 135k - Groulated and conditioned mud while reciprocating and rotating pipe F/ 17,570' Tf 17,850' with 40agpm - 190Olpsi - 22-28k to -Trenching F/ 17,870 7117,890' -Kick off and time drilling F/ 17,890' T/ 17,716' - Drllling L04 F/ 17,716' TJ17,885' as per DO parameters 54 0 2/102019 2/1112019 - Doilin 04 117,865' T/ 19,635' es per Diredional Driller and K&M parameters -1WM M - 470/4401gpm - 2300122 si - WOB/10125k - 24-26k/Tonque - P/U Wl 310k - S/O Wt 135k - Rot volt 21 Ok ECD 11.68 ppg - Max gas 255 units Take SCRs every 500' drilled, serviced rig while performing SCRs 60.0 2/112019 2/12 0 9 -Drilled L04 F1 19,635 ) as per Directional Driller & K&Mparameters with 4 gpm - 2100/psi - WOB/10-12k - 160/RPM - 26k/Torque - P/U Wt 30Ok - Rot Wt 21 Ok - ECD 11.65 ppg - Max gas 126 units - Picked up off bottom, stopped rotary, recycled pumps, and took final survey - BROOH F20,094' T/ 18,320' as per K&M parameters with 430/gpm - 2100/psi-180/RPM - 24k/Torque ( 5 ft/min F/ 20,094'T/19,918'& 15 f !min F/ 19,918' TI 18,320') - Reamed F/ 18,320'T/18,420'- Trenching F118,420' T/ 18, 160/RPM - 24k/Torque - 450/gpm - 2150/psi - 0-8kNVOB - ECD 11.26 ppg - Time drilling for sidetn L05 / 18,440' TI 18,454'- continue drilling original hole F/ 18,454' T/ 18,550' as per DD & K&M parameters W 160/RPM - 24 -28k/Tonque - 450/gpm - 2150/psi-15231UWOB - ECD 11.44 ECD, PN Wt 330k, S/O 135k -Rot Wl 218k 85.0 2/1 19 1312019 - Drilled ahead in LOS F/ 18.550'T/ 19, 1' as per DO & K&M parameters - 18OMPM - 24-28 onque - 4401gpm - 2150/psl - WOB/10-15k - P/U Wt 330k - S/O Wt 135k - Rot Wt 215k - ECD 11.55 - Max gas 200 units - Changed oil anal filters in lube oil pump on Top Drive - Drilled F/ 19,071'T/ 19,888' as per DD & K&M parameters -1 SOIRPM - 24-28k/Torque - 440Igpm - 22001psi - WPB/10-15k - PIU Wt 31 Ok - Rot Wt 215k - ECD 11.71 ppg - Max gas 258 units - Mud Wt in 9.2 ppg - Mud Wt out 9.3 ppg ( The L05 build section started 0 19,197' with 3"/100' build rate) 2/1312019 21142019 - Drilled L05 F/ 19,888' TI 20,664" as per DO & K&M parameters - 1 B0/RPM - 24-28k/Torque - 430/9pm - 2230/psi - WOB/10-15k - P/U Wt 320k - ROT Wt 208k - Max gas 193 units - 11.80 - Changed lube oil pump discharge filter - Drilled LOS F/ 20,664' T/ 20,735' (TD) as per DO & K&M parameters - 18OfRPM - 26k/Torque - 440/gpm - 225D/psi - WOB18-14k - PIU Wt 305k - Rot Wt 208k - ECD 11.84 ppg - Max gas 193 units - BROOH F/ 20,735 T/ 19,541' as per K&M parameters - RPM/150 - 24-26kvorque - 440/gpm - 2200/psi - ( Pulled T/ 19.440'Q 3 Win & pulled TI 19,541 Q 101VMIn) - Inspect NRDDPs while coming out of hole www.peloton.com Page 6110 ReportPrinted: 3202019 Wellftw- Well Name: H04 BC - Daily Recap Dally Operations RCt# Sinn Dale ao4oaw seama(r 63.0 211412OT9— 2115/2019 - BROOH F/ 19,54 1 as per K&M parameters - 4 5 - 26kRorque - 440/gpm - 2200/psi - Rotating P!U Wt 200k - Adding 8.0 ppg pre mix mud Into system to maintain 9.2 ppg - Blow down TD and ng up to circulate @ 200/gpm with FOSV & side entry sub - Remove wash pipe and change out upper quill seals, change oil and fitters and install new wash pipe - R/D circulating assembly, establish circulation and rotary, work pipe 60'- R/U circulating assembly and circulate @ 200/gpm - Change out saver sub - Rig Service - 5Q circulating assembly 64. 2/15/2019 W1612019 - Drilling 06 / 19,513' TI 20,855' as per DD & K M parameters - 170-190/RPM - 24-28k/rorque - 440- 450/gpm - 425/psl - WOB - 1 D -15k - PN W1 331)k - Rot Wt 205k - ECD 11.76 ppg - Max gas 181 units - Took SCRs every 500' 65. 2/1611010 7/2019 - Drlle OB FJ 20,855' 7121,358' (rD) as per DD 8 M parameters 0 RPMI190-26klTorque - 460/gpm - 2445Ipsl • WOB/10-15k - PN Wt 325k - Rol Wt 210k - ECD 12.8 ppg - Max gas 135 units - BROOH F/ 21,358' T/ 21,172' @ 3 ft/min & F/ 21,172'T/ 19,917'@ 15 R/min-160/RPM - 440/gpm - 2400/psl - Ream back to 20.009'- Flushed Top Drive gear box with HD32, Drain, and changed suction screen and discharge fitter - Filled with 75W-90 new oil - Cleaned washpipe and lubricated quill seals - Circulated @ 2001gpm while servicing • Reamed down F/ 20,009'T/ 20,018'- Trenched F/ 20,018' T/ 20,038' as per DD parameters - 440/gpm - 2200/psi -160/R me drilled F120,038' T/ 20,050' - WOB/15k - 160/RPM - 26k/Torque - 440/gpm - 2200/psi -Dn11in L07 12D,060' TI20,060' - t 6D/RPM - 26-28k/Torque - WOBJ15k - 440/gpm - 2200/psi - P/U Wt 321 k -Rot 210k -ECD 11.34 ppg -Pumps shutdown. Picked up off bottom, cycled pumps, found plugged jet, alternated parameters and Geared b8 68.0 2/17!20 9 2/18/2019 - Del d L07 FI 20,087 TI 20,394' as per DD & M parameters - 1 IRP - 4k/rorque - 450/gpm - 2330/psl - W08115k - PN Wt 315k - Rot Wt 210k - ECD 11.08 ppg -Max gas 62 units -Low lube oil psi shut down TD - Chalgetl discharge filter &serviced rig whfle circulating @ 200 gpm - Dnikd L07 FI 20,394' TI 20,760' as per Dd & K&M parameters - 790/RPM • 26kltorque - 450/ppm - 2350/psi - WOBl10-16k - PN WI 325k - ROT Wt 21 Ok - ECD 11.7 ppg -Mex gas 154 units - Took SCRs every 500' drilletl • Orainetl oil out of TD, Replacetl lune oli pump antl filters, "sled w8h new 75W-90 oil & circulating @ 200/gpm - Serviced rig - Drllletl L07 F/ 20,760' jT/ 20,872' as per DD 8 K&M parameters -190/RPM - 23-26klTolque WOBl10-17k - 450/gpm - 2400/psi - PN Wt 320k - Rat Wt 21 Ok - ECD 11.63 ppg • Max gas 122 units 67.0 20 9 19/2019 - rill L07 F/ 20,872' Tf 21,148' as per DD M parameters - 1W RPM - 24k 020 - WOB/15.30k - 480�751gpm • 24252625/psl - PN Wt 335k - Rot Wt 220k - ECD 11.82 ppg - Max gas 117 units - TDS shut down due to low oil pressure - Stand back one stand and drain oil in TD -checked lube oil flaw sensor - Fllled with new oil and changed filters - Drilled L07 F121,148' T/ 21,260' as per DD & KBM parameters - I901RPM - 27k/Torque - WOS/15-22K - 475/gpm - 2660/psl - PN Wt 340k - Rot Wt 230k - ECD 11.94 ppg - Max gas 116 units - Drilled L07 FI 21.148'T/ 21,830' as per DD & K&M parameters - 19DtRPM - 24- 26kfrorque - W0811 5-20k - 475/gpm - 2600 psi - PN Wt 335k - Rot Wt 205k - ECD 12.11 - Max gas 127 units - Took SCRs every 500' drilled. 680 2/19/2019 2/20/2019 - Drilled L07 F/ 21,830' (TD) as per DD & K M parameters -160/RPM - 24.261UTorque • WOB/12-20k - 465/gpm - 2650/psl - PN Wt 345k - Rot Wt 210k - Max gas 70 units - ECD 12.11 ppg - Took surveys and SCRs - BROOH L07 F/ 21,966' T/ 20,758 as per K&M parameters - 180/RPM - 28k7orque - 465/gpm - 2650/psi - Service Rig - Establish parameters and begin Trenching as per DD F/ 20,800' T/ 20,820' as per DO parameters -15OR2PM - 24k/Torque - 465/gpm - 2525/psi - TI Ring F120,820' T/ 20,834' as per DD Parameters -15D/RPM - 24k1Torque - 465/gpm - 2525/psi - Dril1inkLOJFJ 20,834' T/ 20,853' as per DD & K&M parameters -180/RPM - 26k1Torgm - WOB/15k - 465/gpm - 25W1psi - PILI Wt 33Dk - Rot Wt 205k - ECD 11.67 ppg - Take SCRS - Top Drive shutting down - Change Flow paddle on TD lube system & circulate @ 200/gpm - Drilling L08 F120,853' T/ 20,867' as per DD & K&M parameters - 180/RPM - 26k/rorque - W013/1 5k - 466/gpm - 26OOrJpsl - P/U Wt 330k - Rot Wt 205k - TDS continued shutting down - Sw9ched spare wires in service loop - Serviced Rig - TDS persisted to shut dawn - TD LOB was called @ 20,86T - Changed oil and filters on TDS and BROOH F/20,867' T/ 20,830'C 1 112 fl/min circulating bottoms up each stand reamed - 160/RPM - 29k/Torque - 465/gpm - 2600/psi - SR PILI Wt 210k - ECD 11.65 ppg 9.0 2/20/2019 2/21 2019 TD of HD4 Mother ore67. BROOH from to 5'. 470 GPM, 160 RPM, 29k TO, 15 to 207min. slight pack off seen @ 20385'. Drop back in 10 feet, pulled slower, and it cleaned up. BROOH from 20365' to 17,105' MD. Maintain 470 GPM, 160 RPM, 22k TO. Encountered minor cuttings beds from 17,556' to 17,105'. Shakers unloaded. 100% increase in cuttings load seen on shakers. 70.0 2/21220 9 2/2212019 BROOH from 17,1OV io- 15,668'. Varying pulling -s-p-e6as with downholeconditions. Full drilling parameters. CBU two stands below shoe from 15,668 to 15,595'. Pulled into casing with no rotary. No drag seen. Back ream out 3 stands into the casing from 15,408 to 15,130. Monitor well, static. Make up Halliburton storm packer and hang string off 65 feet from floor. Rig up and test ROPE. Witness waived by AOGCC. 71.0 2/22/2019 2/232019 Complete Koomey draw down test. Blow dawn choke manifo I Rig down test equipment. Drain stack Pull test plug. Set wear ring. Retdeve stone packer. Rig up filter cart, and pump TD gear oil through for one hour. (New filters were dirty after job). R/D cart. BROOH from 15, 128'to 10,080' MD. Monitor well on active pit system. Good hole fill. 72.0 2232019 2242019 Continue to BROOH from 10,0�'to stand #77, 1203' b8 depth. CBU. Monitor well. Static. rop Gyro. POOH on elevators to 634' MD. 73.0 2242079 2252019 rip out of hole on elevators. o surveys recorded each stand to shrink the ellipse o uncertainty or future well planning, Lay down BHA#6. Bit grade 2-3-ST-A-X-ILT-TD. Clean and clear rig floor of BHA components. Prepare to run 4W' liner. Load pipe shed with hanger and PBR with crane. Set GBR power tongs and graphing system on floor. Rig up. Remove drilling bales antl elevators. Install casing bales and elevators. Install HT55 saver sub. Pick up first joint and baker loci silver Bu lert shoe. Run 145 joints of 4W, P110 HYD 663 15.2# liner. AVG torque=8200 Mns. Remove casing bales and elevators. Install drilling bales and elevators. Pick up hanger1PBR,X0. Make up to casing string. Mlx up 5 gallons Of'palmix', pour into top of harnger, let set up for 20 mins. Trip In hole to 5686.22' (Length of liner and running tools). wwvr.peloton.com Page 7110 ReportPrinted: 312012019 D1 uNSt 1104-1-03 Survey Geodetic Report SsmumberBer Energy (Def Survey) -------- Client ,_-.._....,.._ BlueCresl ..y, nm.r.eea: Vemcal Section Admulh: uan 300.000'(T. Nodr) Field: Cosmopolitan Unit Vertical Ssdknn Origin: 0.000 it, 0.000 It Wall elSlot H�mopoliten Pad /H4M(3) ,R'1 s $ 1v TVD Reference Elevation: apiary 179.650 It above MSL 9orehm.: 1104103 � \ Ground Elevation: 145.200 ft above MSL APIA: 502312006462 Magnetic DecllnrtlOn: 14.474' Survey Name: 1104103 Total Gravity Field Strength: 1001.2613mgn (9.80665 Based) Survey Dale: Fenuary 02, 2019 Gravity Model: DOX Tort / AHD I DDI 1 ERD Rano: 214.481 - / 16285.32511 / 6.9169 / 2.264 Total Magnetic Field Strength: 55079.653 nT Coordinate Reference System: NAD27 Alaska State Plane, Zone 04, US Feel Magnetic Dip Angle: 72.870' Location Let I Long: N 50' 51' 29A86ST. Vy 151' 48' 6.02209' Declination Data January 15, 2019 Location Grid NIE YD(: N 2144597.860 ftUS, E 168603.610 WS Magnetic Declination Me&]: HDGM 2018 CRS Grid Comergence Mgte: -1.5582- North Reference: Tota NOM Grid Scale Factor: 1.00002484 Grid Convergence Uaed: Dom ° Version I Patch: 2.10.544.0 Totel Corr Mag NOrthF,True NOM: 14.4741' Commerce, MD (111 Incl Pt Asim True M TVDSS 1111 TVD rflt VSEC M) AND (111 Closure PoI NS (111 EW Iq1 OLS 1°1100111 Nadhmg IH ) Easting fl 1 Latitude Longftude 1 1 it WE 0.00 0.00 0.50 -1]9.65 0.00 111 0.00 0.00 O.DD 0.00 N/A 2144597.86 168803.61 59.858190170 -151.80167280 34.45 0.00 0.00 -145.20 34.45 0.00 0.00 0.00 000 0.00 0.00 2144597.86 168803.61 59.5581%70 -151.801617280 %.50 0.31 231.44 -93.15 %.50 0.05 0.14 0.14 -0.09 -0.11 0.60 2144597.18 168503.50 59.8581%46 -151.80167340 181.00 0.54 255.22 1.35 181.00 0.46 0.83 0.82 -0.36 -0.74 0.30 2144597.52 168802.86 59.8581M71 -151.80167683 275.30 0.64 258.14 95.64 275.29 1.17 1.80 1.8 -0.58 -1.69 0.11 2144597.32 168801.91 69.85818911 -151.80168197 370.20 0.75 267.35 190.54 370.19 2.09 2.95 2.92 -0.2 -2.82 0.16 2144597.22 168800.171 59.8581118733 -151.80168817 465.00 1.40 285.54 285.32 464.97 3.3 4.72 4.58 -0.44 -4.56 DT' 2144597.55 168799.04 59.85818950 -151.80169761 560.40 2.21 281.40 380.67 560.32 6.60 7.R 7.49 0.24 -7.49 0.% 2144598.30 168796.13 59.85819135 -151.80171352 6%.00 3.45 281.82 475.15 654.80 11.04 12.39 12.12 1.18 -1206 1.31 2144599.37 168791.59 59.85819393 -151.80173840 749.60 5.14 279.75 569.48 749.13 17.72 19.47 19.18 2.48 -19.02 1.79 2144600.86 168784.66 59.85819749-151.801TT627 644.20 7.23 277.39 663.53 843.18 27.19 29.66 29.37 3.97 -29.10 2.23 2144602.62 168774.62 59.85820155 -151.80183110 938.50 9.21 278.18 756.85 936.% 39.67 43.15 42.85 5.80 42.46 2.10 2144604.82 168761.32 59.85820658 -151.80190374 1037.30 11.65 281.60 854.02 1033.67 56.48 61.03 60.72 8.93 -60.06 2.55 2144608.42 168743.81 59.85821514 -151.801999417 1080.14 12.65 282.32 895.90 1075.55 65.0 70.04 69.72 10.80 -68.88 2.36 2144610.% 168735.05 59.8582206 -151.80204744 1173.22 15.15 285.88 986.24 1165.89 %.50 92.39 92.00 16.31 -90.54 2.84 2144616.62 160713.54 59.85823532 -151.80216525 120.32 117.1% 290.15 1077.49 1257.14 112.76 119.16 118.% 24.65 -115.97 2.83 2144625.66 168688.35 59.85825814 -151.80230353 1359.79 20.00 289.70 1164.09 1343.74 141.75 10.61 147.78 34.68 -143.65 2.67 2144636.43 168660.95 59.85828558 -151.80245411 1453.88 22.48 287.92 1251.78 1431.43 175.17 182.69 181.74 45.64 -175.92 2.72 2144648.27 10628.99 59.85831556 -151.80262962 1518.73 24.84 288.69 1338.65 1518.30 212.45 220.75 219.74 57.61 -212.05 2.51 2144661.21 168593.20 59.85834829 -151.80282613_ 1641.68 27.12 286.59 1422.20 1601.85 252.20 261.46 260.42 69.91 -250.86 2.64 2144674.57 168554.74 59.85838196 -151.803037' 1733.26 29.37 285.75 1502.817 1682.52 294.28 304.79 303]5 81.97 -292.48 2.49 2144687.76 10513.46 59.85&11494 -151.80326358 1826.71 31.94 285.49 1583.26 11762.91 340.43 352.4 351.39 94.79 -338.36 2.75 2144701.82 168467.94 59.85645003 -151.80351315 1922.88 34.33 284.53 1663]8 1843.43 391.20 405.00 403.95 108.39 -389.14 2.54 214716.80 1664117.% 59.85848723 -151.80378930 2015.47 36]1 284]6 1739.14 1918.79 443.07 458.9 457.74 122.00 441.18 2.57 214731.81 166065.90 59.85852444 -151.80407235 2108.4 39.00 284.62 1812.78 1992.43 496.27 516.02 514.96 136.51 496.54 2.46 214477.82 166310.95 59.85856413 -151.8043737 2201.34 41.18 285.38 1883.62 2063.27 555.817 575.65 574.59 151.95 -554.14 2.41 214764.63 168253.80 59.85860637 -151.8046181173 2296.96 43.25 284.99 1954.43 2134.08 617.98 09.90 638.84 168.77 .616.14 2.18 214783.33 168192.27 59.85865239 -151.805023% 2392.33 45.34 285.09 2022.69 2202.34 682.32 706.50 705.43 186.06 -68046 2.19 2144802.36 168128.45 59.85869966 -151.80537378 2486.29 47.92 285.43 2087.21 2266.86 748.37 714.79 773.73 204.04 -1746.34 2.76 2144822.12 168063.07 59.856174884 -151.8093215 2580.05 50.27 285.60 2148.60 2328.25 816.98 845.65 844.59 222.99 -814.62 2.51 2144842.93 167995.34 59.85860069-151.806IM51 2673.36 52.32 285.41 2206.94 23%.59 887A7 918.46 917.40 242.46 -884]8 2.20 2144864.29 167925.73 59.85885392 -151.80648513 2767.32 54.71 285.77 2262.81 2442.46 960.64 994.00 992.94 262.176 -957.54 2.5li 21448486.57 167853.55 59.85890945 .151.80688068 2861.77 57.11 285.57 2315.74 2495.39 1036.42 102.22 1071.15 283.88 -1032.85 2.55 2144%9.73 167778.84 59.85896723 -151.80729049 29%.0 59.59 285.06 2365.12 2514.717 1113.90 1152.32 1151.25 305.03 -1110.10 2.0 2144932.98 167702.19 59.85902507 -151.8071069 3047.49 62.75 284.97 2409.29 2588.94 1191.42 1232.9 1231.50 325.83 -1187.62 3.45 2144955.87 167625.26 59.85908193 -151.80813230 3142.03 65.32 285.33 245.68 2630.33 1273.57 1317.56 1316.49 348.04 -1269.65 2.74 2144980.30 10513.85 59.85914268 -151.6%9851 3235.83 67.47 285.30 2488.24 2667.89 13%.71 1403.51 1402.44 370.74 -1352.55 2.29 2145005.25 167461.61 59.8592076 -151.80902939 3329.87 68.90 284.85 2523.18 2702.83 1441.07 1490.81 1489.74 393.44 -1436.85 1.% 210.5030.24 10377.% 59.85926685 -151.80948791 342343 68.82 284.82 2556.92 2736.57 1525.29 1578.07 1577.00 415.9 -1521.20 0.09 2145%4.87 1029424 59.85932795 -151.80934673 3518.65 68.84 285.45 2591.31 2770.96 1611.11 1666.87 1865.79 438.97 -1606.91 0.62 2145080.38 16809.19 59.859:19134 -151.81041295 3611.54 66.94 285.n 2624.77 2804.42CosmopLIMR5UniflCosmdol5ifign Pad\FAT4W4103\Hd42M-16%.37 Dm 2145105.95 167126.39 59.8594%t0 -151.810%691 Drilling Office 2.10.544.0 . Schlumberger -Private 4/3/2019 1:59 PM Page 1 of 4 Commams MD Incl A Tragi TVDSS TVD VSEC AMD Closure NS EW OLS Nnrthl" Eawng LWKa Lon9Ma40 IRI 1% 19 (MIIe1 lel Itt) (MI IRI Mt (9180(41 IM 1 ( ) M (°) 3706.36 68.83 285.60 2658.93 2838.58 178016 1841.98 1840.90 480.20 -1775.53 0.20 2145132.18 17041.91 59.85952049 -151.81133013 3799.24 68.97 286.24 2692.36 2872.01 1864.81 1928.63 1927.55 509.97 -180.86 0.66 2145158.20 166959.26 59.85958548 -151.81178338 3895.80 68.92 285.92 2727.05 2906.70 1952.28 2018.74 2017.65 534.93 -1945.45 0.31 2145185.51 16673.38 59.85%5373 -151.81225436 3988.29 69.10 286.09 2760.18 2939.83 2036.06 2105.09 2104.0 558.74 -2028.46 0.26 2145211.57 166791.05 59.85971883 -151.81270586 4082.16 66.88 285.70 2793.84 2973.49 2121.0.5 2192.72 2191.63 582.74 -2112.73 0.45 2145237.85 166707.45 59.85978445 -151.81316428 4175.59 68.40 2%.24 2927.87 3007.52 2205.47 2279.74 2278.64 606.68 -2196.39 014 2145264.05 166624.48 59.85984%D -151.81361931 4269.08 68.86 28517 2861.94 3041.59 2289.94 2366.80 2365.69 630.68 -2280.08 0.68 2145290.33 166541.48 59.85931553 -151.81407452 4362.79 69.51 285.89 2896.00 3075.65 2374.59 2454.10 2452.99 654.50 -2360.06 0.39 2145316.42 166458.16 59.859%064 -151.81453138 44%17 0.% 285.74 2930.11 3109.76 2459.49 2501.67 2540.56 678.36 -2448.32 0.47 2145342.56 166374.58 59.86004588 -151.81498969 4549.96 69.16 286.39 2%3.43 3143.% 2543.95 2628.70 2627.58 702.45 -2531.95 0.70 2145368.91 166291.64 59.86011172 -151.81544458 4642.29 68.46 286.00 2996.81 3176.46 2627.55 2714.78 2713.66 M6A6 -2614.62 0.85 2145395.16 166209.65 59.86017736 -151.81589427 4739.52 68.70 286.09 3032.32 3211.97 2715.40 2805.30 2804.17 751.47 -2701.61 0.26 2145422.50 166123.37 59.86024575 -151.81636745 4832.43 69.07 286.17 306519 3245.44 2799.54 2891.97 2890.84 775.55 -2784.87 0.41 2145448.87 1%040.80 59.86031157 -151.81682035 4925.35 68.99 285.67 3099.04 3278.69 288310 278.73 2977.61 79S.35 -2868.30 0.51 2145474.93 165958.04 59.86037663 -151.81M7421 501819 68.98 285.81 3132.55 3312.20 2%8.24 3065.96 3064.83 823.01 -2952.26 0.14 21457087 1657496 59.86044131 -151.81773089 5113.10 69.21 266.40 3166.20 3345.85 36376 3154.% 3152.93 847.45 -3036.90 0.63 2145527.60 165790.81 59.86050811 -151.81819132 527.20 69.28 286.60 3199.55 3379.20 3139.32 3242.05 3240.91 872.45 -3121.27 0.21 21455K86 10707.15 59.86057643 -151.81865027 530011 68.88 286.34 3232.94 3412.59 3224.25 3329.40 3328.25 897.21 -3205.03 0.50 2145581.91 165624.03 59.86064412 451.819105% 5395.25 68.84 286.34 327.:1 376.66 3309.93 3417.58 3416.42 922.02 -3289.65 0.04 2145609.01 165540.17 59.%71192 -151.819 56619- 5488.48 68.77 285.67 3300.74 3480.39 3394.27 3504.% 3503.30 945.98 -3373.20 0.67 2145635.24 1654.57.30 W.MDM743 -151.820020, 5583.10 68.94 285.49 3331.7 %14.52 3479.74 3 .75 3591.59 969.69 -3458.21 0.25 214%61.25 16572.97 59.86084221 -151.82048311 5675.86 68.7 285.0 3%8.26 3507.91 3563.60 379.29 378.13 MAD -3541.53 0.42 2145686.92 165290.32 59.%0%619 -151.82093634 5772.62 68.81 2%.0 3003.19 3582.84 3651.14 3769.53 3768.37 1017.89 -3628.29 0.11 2145714.06 165204.26 59.860973% -151.82140830 13-3/8- 5800.00 69.08 286.20 3413.02 3592.87 367594 379508 370.92 1024.98 4652,84 1.21 214572].82 16517991 59.86099332 -151.82154185 5826.0 69.35 286.40 3022.60 3602.25 3700.45 3820.31 3819.14 1032.06 -36]7.05 1.21 2145M9.M 165155.% 59.86101267 -151.8217355 5920A3 68.84 286.44 30.55.94 3635.59 3785.31 397.60 3906.43 10M.74 -3760.79 0.55 2145756.W 165072.86 59.86108011 -151.82212%7 6010.40 68.84 286.7 3489.88 3669.53 370.61 39%.28 304.09 101.86 -384498 0.43 2145783.90 164969.58 59.8611478 -051.82258598 6107.26 0.24 287.80 3523.83 3703.48 3950.86 4081.66 4060.45 1107.46 3927.29 0.98 2145811.73 16497.80 59.86121873 -151.82303480 6201.26 6829 287.53 3558.64 373829 4000.13 4168.98 416712 1133.81 -470.7 0.09 2145840.33 164825.30 59.9612%75 -151.8234766 6295.03 68.41 286.20 3593.24 3772.89 4125.00 4256.13 4254.86 1159.09 4093.90 1.32 214587.88 164742.61 59.86135984 -151.82394137 6389.10 69.26 285.07 3627.21 3806.86 4209.98 4343.86 4342.58 1182.73 -4178.41 1.44 2145893.81 1646%.81 59.86142444 -151.7440092 6482.85 68.91 284.92 3660.67 3800.32 4294.56 4431.43 44W.14 12%.39 -4263.0 0.40 2145918.76 164574.86 59.86148634 -151.824861% 6577.63 68.98 285.97 %9492 3874.37 4380.18 4519.88 4518.59 1228.95 4348.26 1.04 2145944.62 164490.28 59.8615570 -151.8253247 672.26 68.79 285.62 3728.81 3%8.46 446515 4608.16 460.7 1252.98 -4033.20 D.40 2145970.95 164406.02 59.86161636 -151.825786% 6765.96 68.79 285.50 3762.71 3942.36 4550.35 4695.51 4694.22 1276.41 4517.35 0.12 2145996.66 164322.0 59.86168038 -151.82624474 6859.42 68.76 280.0 3796.M 3976.20 4630.0 4782.63 4781.34 1300.10 4W1.19 0.56 214W22.63 164239.37 50.86174511 -151.8270082 6953.87 68.66 285.60 38W.84 401DA9 4720.12 4870.63 4869.34 1324.11 405.86 0.47 2146048.0 164155.39 59.8018109 -151.82716141 7047.0 7.93 285.84 3864.53 4044.18 4804.26 4957.46 4956.17 1307.63 4769.43 0.38 2146074.72 16472.48 69.8617496 -151.8276167 7140.85 68.80 28414 3998.37 4078.02 4898.93 5040.99 6043]0 1370.71 4a53.7 1.10 214610.0 163968.70 59.8619372 -151.8287541 7230.40 68.48 285.0 3932.44 4112.0 473.0 5132.12 5130.81 1393.07 4938.08 0A3 214612413 163%5.13 59.86199910 -151.82853350 7328.43 60.7 285.4 3966.87 4106.52 5057.56 5219.62 718.31 1415.75 5022.59 0.10 2146149.70 163921.26 59.862%104 -151.82899326 7421.15 0.91 285.23 4WO.49 410.14 5141.08 5306.03 5304.71 1436.31 -5106.0 0.41 2146174.52 10738.49 59.871227 -151.829447D3 7515.10 68.82 284.32 4034.36 4214.01 5225.63 53%.% 5392.33 14W.66 -5190.73 0.91 2146199.16 163654AO W.86218371 -151.82%0798 760819 68.96 284.33 4%8.11 4247.76 509.79 5481.06 599.71 1482.28 -5275.42 0.15 2146223.08 10570.33 59.8622427] -151.830368E 7703.55 68.78 284.40 4102.27 4281.92 794.91 5M9A5 5568.7 1504.21 -5361.04 0.20 2146247.33 163485.33 59.86230266 -151.83083446 7797.02 69.07 28417 4135.88 4315.53 5478.99 5656.67 5655.27 1526.17 -5445.45 0.48 2146271.58 163401.55 59.86236264 -151.83129368 78010 68.45 285.38 4169.81 4309.46 563.35 743.99 5742.59 1548.88 -552916 0.90 21462%.W 10317.89 59.86242486 -151.83175235 7984.7 69.0 286.16 4203.69 4383.34 569.69 6830.99 M29.59 15M.W -%13.49 0.98 2146322.49 163234.83 59.86248925 -151.832277 8077.30 68.79 285.90 4237.26 4416.91 5732.09 5917.97 5916.57 15%.M -M7.0 0.34 2146348.77 163151.92 59.86255485 -151.83266264 8170.0 68.84 286.44 4271.7 44W14 5816.84 W05.24 00.84 1620.85 -5780.91 0.54 2146375.35 1680018 59.86262124 -151.8331187 8265.20 68.72 286.80 475.22 4484.7 5902.7 603.15 6091.73 1646.0 -7265.14 0.38 214640297 162985.26 59.86268991 -151.8337692 830.83 68.84 286.51 4339.83 4519.48 5989.10 6182.29 6180.96 171.8 -WW.M 0.31 21460W.64 162900.58 59.86275970 -151.83404157 8452.79 68.63 286.44 4373.19 4552.84 60M.42 627.99 70.7 1695.85 -6032.73 0.24 214647.17 162819.09 59.8628208 -151.8344880 8547.93 68.W 286.41 4407.65 4587.W 617.7 638.7 635523 1720.92 -619.79 0.29 2146484.% 16273414 59.862894% -151.83495143 8641.51 68.61 287.33 4441.% 4621.21 6243.% 6043.89 6442.43 174623 -671.25 0.97 2146512.12 162651.99 59.862%609 -151.0540552 8735.44 68.05 287.55 4475.94 4655.59 6328.88 6531.31 6529.80 1772.43 -784.65 0.28 2146540.58 162%9.34 59.%W3 4 -151.83585923 8827.61 68.55 288.43 47912 4689.37 6412]6 6617.06 6615.49 1798.92 6%6.21 0.89 214657.27 17488.53 59.8631759 -151.8363029B 8921.50 0.74 288.39 4543.94 4M3.59 6 98.7 704.59 6702.93 1826.56 -6449.26 0.21 214099.16 17406.26 59.8631879 -151.8775481 9016.64 68.88 287.42 4578.7 477.95 6585.16 6793.21 6791.49 18%.81 -6533.59 0.% 214678.69 16232210 59.%3257% -151.83721362 9110.41 69.26 286.29 4611.79 4791.44 W70.44 688099 079.06 1879.20 6617.41 1.20 21466%.% 162239.0 7.033205 -151.83766960 9200.05 68.54 20.28 4645.5D 4825.15 6755.31 6969.16 6%6.42 1%390 .701.26 O.M 214%83.12 17156.44 59.86339374 -151.8372587 927.W 69.19 286.11 4679.13 485818 03918 7055.13 70%.99 1927.96 -6784.79 O.M 214709.64 16273.60 59.863459% -151.8385807 092.40 M.% 286.97 4713.08 4892.73 6926.17 713.7 7142.22 1953.24 0869.95 0.7 2146737.24 161989.16 7.8635290 451.83804W1 9086.21 69.00 286.48 474611 4926.W 7011.40 7231.50 7M918 1978.45 6953.81 0.49 21476411 161906.01 59.0637785 .151.83949991 9%0.37 69.7 285.09 4760.40 4960.05CosmopN*PPUnit\CosmcloRign Pad\FI94M4-L03\Hff44M -707.42 1.38 2146790.92 161822.0 59.86366315 451.83%6023 UriIiing once 2.10.544.0 Schlumberger -Private 4/3/2019 1:59 PM Page 2 of 4 Commem ND HH Inct 11 ASM True 1% TVDSS Iftl TVD Iftl VSEC Iftl AHD Iftl Cloture NS lftl EW DLS No"hing ee08ng WhuM l.ongltuC %13.15 59.12 284.59 4813.]2 4993.37 718D.83 ]406.]0 Iftl ]404.93 2024.71 Iftl -]122.]5 1°/100ft1 0.50 (R 1IN 2146815.55 SI 161]38.39 1°I VI 59.863)2414 -151.84041900 9767.11 69.41 284.78 4846.78 5026.43 7265.04 7490.D1 7492.22 2046.84 -7207.21 0.36 2146839.97 161651.% 59.86378456 -151.84087852 9861.17 68.93 284.97 48%.22 5059.87 7349.91 7581.92 75%.12 2069.41 4292.17 0.51 2146864.84 16157024 59.66384616 -151.84134079 9955.01 68.98 285.60 4913.92 5093.57 7434.62 7669.50 ]66].70 2092.50 -7376.65 0.63 214685.22 181486.42 59.86390918 -151.84180043 10050.17 69.05 285.81 4948.00 5127.65 790.2 7758.35 7756.50 2116.55 -7462.19 0.22 2146916.59 161401.57 59.86397483 -151.84226578 10144.92 68.97 285.70 4981.94 5161.59 76%.46 7846.81 7845.01 2140.57 -]54].33 0.14 2146942.92 161317.11 59.%40404D -151.84272900 10237.19 69.39 285.51 5014.74 5194.39 7689.% 7933.06 7931.25 2163.77 450.39 0.49 2146968.37 161234.71 59.86410373 -151.84318095 10331.88 69.31 285.22 5048.13 522].]8 79513 8021.67 8019.85 2187.24 -]]15.83 0.30 2146994.16 161149.93 59.86416781 -151.84364580 10425.43 69.25 285.50 5081.23 5260.86 7860.39 8109.17 8107.35 221045 -78%.20 0.33 214]019.65 161066.23 %.86423115 -151.84410482 1017.11 %.% 285.78 5114.15 9%.5 7943.29 8194.73 8192.91 2233.55 -7882.% 0.69 2147044.98 16%84.% %.86429419 -151.84455308 1%10.84 69.16 285.05 5147.88 5327.53 %27.92 8282.18 8280.36 2256.79 -7966.89 O.m 2147070.51 1%%0.85 %.86435763 -151.845011]] 10704.% 68.92 283.16 5181.41 5361.% 8112.09 8369.70 836].84 2278.12 -%51.76 1.5 2147094.14 160816.59 59.86441583 -151.84547355 10798.48 68.82 282.74 5215.26 5394.91 8195.85 8457.30 8458.34 2297.75 -8137.14 0.43 2147116.08 160]31.7] 59.66446938-151.M59M6 10891.67 68.79 283.27 5248.95 5428.60 8278.94 8544.19 8542.12 2317.30 -8121.80 0.53 2147137.93 160647.68 59.66452272 -151.84639866 1098].2] 68.83 284.24 5263.51 5463.16 8364.51 %33.33 8631.20 2338.50 -638.38 0.95 214]161.4] 160%1.71 5486458054 -151.846%972 11081.24 68.93 284.91 531].3] 5097.02 8449.01 8720.98 8718.84 23%.% -M93.21 0.67 2147185.83 160477.50 50.8646492 -151.84733130 11175.49 68.84 284.90 5351.31 5530.97 8533.90 8%8.91 88%.76 2383.17 -M78.18 0.10 2147210.75 16%93.18 59.86470243 -151.8779358 11267.45 68.41 284.56 5384.84 5%4.49 8616.51 8%4.54 8892.38 2404.94 -8%1.00 0.% 217234.1 160310.98 58.8676184 -151.84824420 11363.23 68.75 284.36 5419.82 5599.47 8702.42 8%3.70 8981.52 2427.21 -867.34 OAO 21472%.37 160225.28 %.86482259-151.8871397- 11456.53 68.79 285.26 505.60 5633.25 87%.35 570.67 90M.48 2449.44 -8731.41 0.0 217283.88 160141.83 %.86468324 -151.849171, 115%.64 69.17 284.81 5487.36 5%7.01 8871.21 91%.52 9156.32 272.23 -8816.25 0.60 2173%.97 160057.64 59.86494541 -151.84963305 11644.31 68.78 284.69 5520.97 95.9 8955.57 9245.95 9243]4 2494.49 -89%.81 0.43 2147333.52 1599]3.]2 S.%500614 -151.8%09310 11]39.2] 69.03 285.50 55%.15 5]34.80 9041.19 9334.55 9332.34 2517.59 -89%.34 0.88 2173%.94 159888.85 50.%5%917 -151.855567 11833.52 68.89 265.07 5588.98 5768.63 9126.28 9422.51 9420.30 2540.81 -9071.18 0.49 2147384.46 159804.67 %.%5132% -151.85102013 11924.32 %.69 285.57 %21.83 %01.48 %08.16 957.16 954.95 2%3.17 -9152.82 0.% 2174%.04 159723.% 59.%519354 -151.85146034 12018.5 69.13 285.51 %55.73 5835.36 %93.28 955.% 9592.85 2566.75 -9237.5 0.47 2147034.5 159639.65 %.865585 -151.85192510 12112.53 68.% 285.54 5689.36 5869.01 9378.28 9682.80 9660.63 2610.26 -9322.0] 0.19 214746D.71 159555.5 58.86532201 -151.8538526 12206.16 68.92 284.96 5723.01 5902.66 9062.78 9770.22 9768.00 2633.24 -9406.37 0.% 2147485.98 15972.11 59.8653&171 -151.85284393 123%.16 69.02 285.34 5756.75 59%.40 957.59 %57.95 9855.73 2656.17 -9491.% 0.39 2147511.20 15388.07 59.551726 -151.833074 12392.91 68.99 285.30 5789.96 569.63 9631.35 9944.55 9942.32 2679.06 -074.57 0.05 2147536.34 15935.21 59.8655%7 -151.8575917 12487.08 68.76 285.34 %23.92 6003.57 9716.33 1532.39 10030.16 2702.26 -%%.29 0.25 217%1.85 159221.15 59.86557298 -151.85422015 125122 68.96 286.08 5857.87 6031.% 9801.41 10120.19 10117.97 2726.4 .9743.82 0.76 214]5].91 1%137.30 %.%563784 -151.85468007 12673.95 68.89 286.51 591.21 690.86 9885.48 10206.72 10204.49 275.31 -9826.87 0.44 2147614.44 159051.94 59.86570407 -151.85513196 12769.34 68.96 286.09 5925.51 6105.16 9971.% 10295.73 10293.49 2]]5.30 -%12.30 0.42 217641.74 158970.22 59.865]]223 -151.85559684 12864.42 67.47 286.22 %60.60 6140.45 10057.67 10384.02 10381]8 2799.86 -%7.10 1.57 214765.60 158886.11 59.86583924 -151.85e)5828 1295.37 68.16 286.67 5996.27 6175.92 10142.25 10471.01 10468.76 2824.49 -10080.54 O.% 2147695.49 15853.38 59.%590843 -151.8%81228 13051.65 68.67 287.28 6030.59 6210.24 10226.5 1057.75 105M.48 2849.81 -10163.5 0.82 214)723.% 15721.14 59.86597552 -151.85%370 13145.0 68.44 287.28 6064.75 6244.0 1%11.5 10644.71 1%42.40 2875.64 -10246.53 0.25 217751.14 158638.83 S.666046% -151.85741555 13238.01 %.91 286.44 6098.54 6278.19 1095.88 10731.28 10728.95 2900.75 -10329.38 0.96 214978.49 15855610 59.86611449 -151.8578%% 13330.79 69.06 2%.33 8131.82 6311.47 10080.05 10817.89 10815.55 2%5.18 -10412.47 0.20 21755.17 15674.30 59.86618113 .151.8583185 13424.91 6818 286.04 6165.67 6345.32 1%65.33 10905.71 1053.37 2949.% -104%.81 0.41 2147831.94 153%.65 %.86624791 -151.85]7744 13519.24 67.0 285.63 6200.46 635.11 1%5.35 1090.39 10%1.05 2973.59 -10581.16 0.99 214785.15 1%36.96 %.86631316 -151.85923643 13613.88 6826 285.5 6235.77 6415.42 10735.40 11081.19 11078.86 299].21 -10665.73 0.35 217884.06 158223.08 59.6663775 -151.85%9662_ 13707.84 68.32 286.06 6270.53 645.18 10820.03 11168.49 11166.15 3021.01 -10]49.)2 0.48 2147910.13 151399] 59.86644248 -151.860153] 1353.25 69.15 285.40 6305.13 6484.78 10906.20 11257AO 11255.% 300.5.11 -10635.30 1.08 2147936.55 158%1.87 59.86650821 -151.86%1935 13895.49 69.72 286.15 6337.53 6517.18 10969.91 11343.76 11341.2 3068.59 -10918.41 0.98 217962.29 15792.43 %.8665M24 -151.%1071% 13989.32 69.30 285.95 6370.38 655.03 11075.22 11431.66 11429.32 3092.89 -11002.68 0.49 214]988.8] 157888.65 59.86%3851 -151.86153123 1406216 69.28 286.42 640.42 6%3.9 1115.03 11519.% 11516.2 3117.03 -11086.88 0.17 2148015.29 1578%.34 59.86670435 -151.86198830 14175.69 69.% 286.11 6436.25 6615.% 11244.43 116%.5 11603.65 3141.16 -11170.40 0.08 2148041.69 15)122.5 59.866]]016 -151.86244285 14269.92 69.31 286.29 6469.51 6649.16 11330.05 11694.16 11691.81 3165.76 -11255.9 0.18 214800.% 157638.54 59.86%3724 -151.862535 14364.39 68.87 285.58 65%.22 6%2.87 11415.65 11782.41 1175.% 3109.99 -11339.92 D.84 214595.11 157554.37 59.%690331 -151.8633653 140.57.05 69.20 285.27 6536.38 916.03 11499.40 11%8.94 118%.% 3213.5 -11423.33 0.47 2148120.38 157471.61 5S.86696605 -151.%381921 1455L66 69.52 285.16 6569.73 6749.38 1155.00 11957.47 1195.12 3236.24 -1158.76 0.36 2148145.% 157386.84 59.56702940 -151.86428411 14645.17 69.17 285.17 6602.71 6782.36 11669.% 12044.97 12042.61 M%.13 -11593.22 O.3] 2148171.11 157303.04 59.86]09180 -151.86743% 1739.31 69.60 285.32 6635.86 6815.51 11754.79 12133.08 1213092 3282.30 -1198.23 0.48 21481%.% 157218.69 59.5715496 -151.%%0628 14833.52 68.94 285.50 6669.20 6848.85 11840.06 12221.19 12218.83 3305.71 -11763.17 0.72 214922.30 157134.41 59.8672199 -151.86566852 14926.9 69.00 285.94 902.69 689.34 11924.45 123%.28 12305.9 3329.30 -11847.00 0.44 214948.16 157051.26 59.%)28312 -151.8661270 1591.03 68.39 286.02 6736.92 6916.57 12009.61 12396.05 12393.69 335.7 -1101.38 0.65 214974.61 156%7.% 5.%]30900 -151.866%388 15115.49 68.20 2%.% 6]]1.85 6951.5 12%4.78 12483.81 12481.45 33]7.]3 -12015.72 0.21 2148301.16 156883.91 59.86741515 -151.867042% 15%.61 0.48 286.5 656.22 6%5.87 12178.88 12570.36 12567.99 349.9 -12098.]] 0.5 2148327.74 15801.55 S.%7495 451.66749483 1539.7 69.% 29.22 6840.21 7019.86 12264.09 1265].85 12655.46 3127.5 -1219.48 0.89 214835.45 1%718.56 %.8675585 .151.8679538 15370.97 70.07 288.19 6864.12 7043.] 12326.81 12722.04 12719.61 347.9 -12203.63 1.96 2148376.62 156657.% %.89604% -151.8696315 9SS" 15406.5 71.14 288.34 6875.6 7OM41 12359.16 1275508 1275262 345738 -1227501 3.09 214839.83 05662688 59.86763234 451.6684590 15148.73 ]2.45 288.% 6889.11 705.76 12398.92 12)95.9 1993.16 370.22 .12313.51 3.09 2148001.71 1%568.3 %.8676935 -151.86%6347 15541.01 75.% 291.02 6914.22 7093.9Cosmoo;j%9Unit\Cosnl@P Mn PacW41K@4-L03kH9n 3 .12397.05 4.61 2148434.02 1%506.% %.86]]4933 -151.8691159 Uriiiing orrice 2.10.544.0 . Schlumberger-Private 4/3/2019 1:59 PM Page 3 of 4 Comments MD 1X1 1.1 PI Atlm True PI TVDSS 1X1 TVD 1X1 VSEC (Fit AHD Iftl Ciocun 1X1 NS He EW Ift) DLS P1i60m NomMrg IX 1 E.Wrig (ftus) Latitude Longitude 1.1 71 15634.62 80.24 293.63 6933.52 7113.17 1259.04 12976.03 129]2.69 3535.06 -12481.74 5.32 2148471.11 156422.32 59.86784429 -151.86957908 15]2].90 84.46 294.37 6945.94 7125.59 12668.96 13068.45 13064.18 3572.66 -12566.18 4.59 2148510.99 156338.94 59.86794691 -151.87003865 15823.82 89.91 296.64 6950.65 7130.30 12764.43 13164.22 13158.60 3613.90 -12652.61 6.15 2148554.9 156253.66 59.86805948 -151.87050909 15919.64 90.40 297.46 69W.39 7130.04 12860.12 13260.04 1322.64 3657.47 -12737.95 1.00 21486W.45 156169.54 59.86817845 -151.87097361 Tie -In Surwv 16011.79 90.97 298.11 6949.29 7128.94 12952.20 13352.18 13342.86 3700.43 -12819.46 0.94 214860.5.60 156089.22 59.86829572 -151.87141736 16104.81 89.79 299.77 6948.67 7128.32 13045.19 13445.20 13433.56 3745.44 -12900.86 2.19 2148692.81 156009.07 59.86841862 -151.87186047 16198.31 88.79 298.69 6949.83 7129.48 13138.67 13538.69 13524.66 3791.09 -12982.45 1.57 2148740.66 155928.76 59.86854327 -151.87230460 16290.86 90.05 298.94 6950.9 7130.42 13231.22 13631.26 13615.03 3835.70 -13063.55 1.39 2148787.47 155848.90 59.86866509 -151.8794610 16385.69 91.57 299.38 6949.43 7129.08 13326.01 13726.05 13707.49 3881.89 -13146.33 1.67 2148835.89 155767.40 59.86879121 -151.87319676 16479.77 90.14 299.11 6948.02 7127.67 13420.06 13820.12 13799.23 3927.85 -13228.41 1.55 2148884.06 155686.60 59.86891669 -151.936439- 16573.24 90.15 300.30 6947.79 7127.44 13513.53 13913.59 13890.26 3974.17 -13309.60 1.27 2148932.57 155606.70 59.86904316 -151.874085 16666.71 91.11 302.01 6946.76 7126.41 13606.97 14007.05 13980.75 4022.52 -13389.88 2.10 2148983.08 155528.06 59.86917520 -151.874520: 16760.47 90.21 303.47 6945.68 7125.33 13700.61 14100.81 14070.88 4073.22 -13468.43 1.83 2149035.91 155450.61 59.86931367 -151.87495031 Ti.In Survey 16855.96 91.82 304.80 6943.99 7123.64 13795.84 14196.28 14162.06 4126.79 -13547.45 2.19 2149091.61 155373.07 59.86945999 -151.8753809 16949.17 90.00 304.44 6942.51 7122.16 13888.73 14289A7 14250.88 4179.74 -13624.15 1.99 2149146.63 15997.85 59.86960460 -151.8799615 17043.01 89.82 304.59 6942.65 7122.30 13982.28 14383.31 14340.43 4232.91 -13701.47 0.25 2149201.88 15922.00 59.86974983 -151.87621917 17136.37 90.01 304.41 6942]9 7122.44 14075.35 14476.67 14429.57 4285.79 -13]78.41 0.28 2149256.84 155146.9 59.66989425 -151.87663810 In30.76 89.74 303.2 6943.00 7122.65 14169.W 14571.06 14519.97 4338.66 AW6.60 0.78 2149311.82 155069.80 59.87003865 -151.87706386 17324.32 89.51 303.72 6943.61 712326 14262.86 14664.62 14609.77 439060 -13934.42 0.25 2149365.85 154993.42 59.87016050 -151.87748757 17418.50 91.22 303.43 6943.01 749.86 14356.85 14758.79 14700.28 4442.68 -14012.88 1.84 2149420.05 154916.40 59.8703293 -151.87791479 17512.42 92.03 304.62 6940.35 7120.0 14450.W 14852.68 14790.35 4495.21 -14090.69 1.53 214904.68 154840.05 59.87046019 -151.87833846 17606.28 90.81 305.26 6938.02 7117.67 14543.98 14946.51 14879.99 4548.95 -14167.61 1.47 2149530.49 15064.62 59.87061296 -151.8795729 17698.15 90.7 304.75 6936.75 7116.40 14635.49 15038.37 14967.76 4601.64 -14242.85 0.87 2149585.21 154690.83 59.995688 -151.99199 17792.33 92.96 3U4A3 6933.69 7113.34 14729.31 15132.49 1509.95 405.08 -14320.34 2.35 2149640.73 154614.83 50.87000282 -151.9958895 17887.21 99.21 39.15 6923.64 7103.29 14823.12 15226.79 15147.76 4710.21 -14396.83 7.18 2149697.93 154539.86 59.9105340 -151.88000550 17980.69 101.18 39.29 6907.09 7086.74 14914.39 15318.9 15234.73 4765.86 -14470.09 2.11 2149755.55 154468.14 59.9120510 -051.88040447 1895.40 103.07 306.43 689.20 7066.85 15006.32 15411.38 15322.49 4821.40 -14544.17 2.18 2149813.09 154395.59 59.913911 -151.8808990 18168.46 104.53 304.76 6865.00 7044.65 15096.26 15501.75 15408.82 494.00 -14617.65 2.34 214989.9 154323.9 59.915098 -151.88120805 18263.00 106.59 303.44 6839.64 7019.29 15187.09 15592.9 15496.52 4925.06 44693.06 2.56 2149920.76 154249.58 59.87164022 -151.88161868 1839.39 108.02 303.80 6811.56 6991.21 1597.03 1569.94 15583.55 494.96 -14768.10 1.56 2149972.68 154175.92 59.87177646 -151.8820931 18451.48 109,42 303.79 6781.37 6961.9 15365.94 15772.05 15669.57 5024.52 -04842.15 1.49 2150024.24 154103.24 59.9191182 -151.88243057 18544.72 112.42 304.44 6748.08 6927.3 15452.80 15859.13 15753.54 5073.36 -14914.25 3.28 215095.02 154032.49 59.9204518 -151.88282320 18639.83 114.17 305.63 910.46 6890.11 15539.82 15946.48 15837.42 5123.W -14985.78 2.17 21W127.09 153962.35 59.921911 -151.88321272 18731.92 114.80 305.9 692.30 6651.95 15623.22 16030.29 15917.68 5172.35 AW53.88 0.69 2150177.77 153895.60 59.9231551 -151.88358360 18825.72 116.13 305.37 6631.97 6811.62 15707.51 16114.98 15998.9 921.55 -15122.81 1A5 21W228.83 153828.04 59.9244988 -151.883958' 18919.74 117.43 303.88 6589.60 6769.25 15791.17 16198.91 1699.73 5269.24 -15191.87 1.0 2150278.39 153760.30 59.9256013 -151.884335 18928.66 117.31 303.20 6585.50 670.15 15799.07 16206.83 1609.41 5273.62 -15198.47 6.90 2150282.94 153753.9 59.9259208 -151.88437102 19017.00 117.31 303.20 6544.9 6724.62 1597.44 16285.33 16163.56 5316.60 -1964.15 0.00 2150327.69 153689.33 59.990943 -151.88472869 Survey Error Modal: ISCWSA Rev 0- 3O 95.000% COMidence 2.7955 sigma Survey Program: Descdp6on Pan MD From MD To EOU Frey Hole Sin Casing Diameter rvey SuTool T YPe Bonllola/Surrey 1X1 1X1 mi IMI lint 1 0.000 UAW Ad SMs 16.WO 13.375 SLB_NSG+SSHOT-DepN Only 11OF101I HN04{01 1 0.000 1037.300 Act Sas 16.00 13.375 SLB NSG+SSHOT 1104-1.01 11104-101 1 1037.300 5772.620 Ad SM. KWO 13.375 SLB MWD+GMAG H0 Wl 11104101 1 972.620 15302.470 Ad SMs 12.250 9.625 SLB MWD+GMAG 110 41.01 1 1101101 1 15302.470 16011.90 Act SMs 8.500 D.000 SLS MWD+GMAG 1101.1.01 1 110 4-1.01 1 16011.7% 16355.960 Act SMs 8.500 0.000 SLB_MWD+GMAG H04L02/1104102 1 16855.960 18928.660 Act Sire 8.500 0.000 SLB MWD+GMAG HOW -Wo I1104 03 1 18929.660 19017.000 Act SM. 8.500 O.Ow Sla BLIND+TREND H041-031 M4 03 Cosmopolitan Unit\Cosmopolitan Pad\HM1404-1-03\1104-1-03 Ddiling office 2.10.544.0 . Schlumberger -Private 4/3/20191:59 PM Page 4 of 4 H04 Rev i Actual Mud Weight vs. Depth Data Table Days Depth MW From MD ppg Operational Notes Spud 0 8.6 PU DP / Prepare BHA / fill conductor 0 267 8.8 Spud well / drill to 308' for RSS BHA 1 758 9.0 Drill to 310'/ TOH for RSS BHA / TIH & Drill 17-1/2" 2 2430 9.8 Drill 17-1/2" surface section / 68 deg angle 3 3860 10.2 Drill 17-1/2" surface section / 68 deg angle 4 4910 10.25 Drill 17-1/2" surface section / 69 deg angle 5 5810 10.45 Drill 17-1/2" surface section to 5810' MD / BROOH 6 5810 10.4 BROOH for casing / LD BHA / RU to run 13-3/8" 7 5810 10.2 Run 13-3/8" surface casing 8 5810 10.3 Run 13-3/8" surface casing 9 5810 10.0 1 Run & cement 13-3/8" surface casing 30 5810 10.0 Displace cement / bump plug / install starter head 11 5810 9.6 NU & test BOPE / clean pits / build OBM / top job 12 5810 9.6 Work on top drive / MU BHA #3 cleanout BHA / PU DP 13 5810 9.6 TD rail alignment / RIH w/ singles & cleanout BHA 14 5810 10.5 Test casing to 3K; drill out shoe track / swap to OBM 15 5810 10.5 POOH for RSS BHA / Test BOPE 16 5810 10.5 ITest BOPE / Dummy Run 9-5/8" Hgr / RIH w/ RSS BHA 17 5963 10.5 RIH / Drill out shoe / FIT 13.2 ppg / Drill ahead 18 8590 10.5 Drill intermediate section w/ RSS BHA 19 11031 10.55 Drill intermediate section w/ RSS BHA 20 12790 10.55 Drill intermediate section w/ RSS BHA 21 14394 10.6 Drill intermediate section w/ RSS BHA 22 15420 10.55 Drill intermediate section w/ RSS BHA to Csg Point 23 15420 10.55 Circ & Cond at TD / Backream out for Casing 24 15420 10.55 Backream out for Casing 25 15420 10.5 POOH for casing / LD BHA / Test csg rams / RU to run csg 26 15420 10.55 Run 9-5/8" casing 27 15420 10.5 Run 9-5/8" casing 28 15420 10.6 Run 9-5/8" casing; land at 15406' MD; cement same 29 15420 10.65 Cement 9-5/8" / clean pits / chg rams / MU drill pipe 30 15420 10.65 Test BOPE / MU BHA 5 for production section 31 15420 10.2 RIH / test csg to 3500 OK / clean out shoe track 32 15440 9.3 Swap mud systems / drill 20'/ run FIT to 13.5 ppg EMW 33 16828 9.4 Drill 8-1/2" section to LOl / TD in L01 lateral / BROOH 34 16445 9.4 Trench & timedrill to L02 lateral 35 18230 9.5 TD in L02 lateral / BROOH 36 17957 9.5 JBROOH L02 / Trench - ST - Drill L03 37 19017 9.5 TD in L03 lateral / BROOH / spot LCM pill 38 19017 9.5 BROOH to inspect / change BHA / chk Super Sliders 39 19017 9.5 BROOH to inspect / change BHA / chk Super Sliders 40 19017 9.5 Inspect BHA / LDDP / remove worn out Super Sliders 41 19017 9.5 Manage drill pipe / test BOPE 42 19017 9.5 PU DP / MU BHA / RIH to drill L04 43 17690 9.55 RIH / Circ and condition mud / Prep to drill L04 44 17865 9.3 Trench & timedrill to L04 lateral / reduce MW 45 19635 9.2 Drill L04 lateral / seepage mud losses ongoing 46 20094 9.2 Finish & Backream L04 /Trench & drill L05 lateral 47 19888 9.25 Drill LOS lateral 48 20735 9.3 Drill L05 lateral / BROOH in L05 49 19513 9.2 Drill L06 lateral so 20855 9.2 Drill L06 lateral 51 21358 9.2 Finish L06 / BROOH / Trench & ST to L07 52 20872 9.2 Drill L07 lateral 53 21830 9.2 Drill L07 lateral 54 21966 9.2 ITrench & ST to L08 / Drill L08 lateral partially / top drive issues / BROOH 55 20867 9.2 TD of L08 Mother Bore is 20867' MD / BROOH to shoe 56 20867 9.2 Hang Off & Test BOPE - 14 days / BROOH 57 20867 9.2 BROOH 58 20867 9.2 BROOH / POOH on elevators 59 20867 9.2 LD BHA / MU 4-1/2" slotted liner / RIH 60 20867 9.2 Run 4-1/2" slotted liner / enter LOl wrong lateral BROOH 61 20867 9.25 BROOH / Pump out with 4-1/2" slotted liner 62 20867 9.2 1 Lay down 4-1/2" liner 63 20867 9.2 Lay down 4-1/2" liner / Repair Top Drive 64 20867 9.3 Service rig / wait on Top Drive parts and Tech 65 20867 9.3 Tesco Tech arrived / tear down Top Drive / repair same 66 20867 9.3 Complete Top Drive repairs / MU Cleanout BHA -7 / RIH 67 20867 9.3 Manage drill pipe / RIH w/ cleanout BHA -7 68 20867 9.3 RIH w/ cleanout BHA -7 / hang off on RTTS packer at shoe 69 20867 9.25 ITest BOPE / Release RTTS / Ream in hole clean out 1.O3 junction 70 20867 9.25 IClean out open hole / dress junctions for liner / clean to TD 71 20867 9.3 BROOH and dress each junction area 72 20867 9.3 BROOH and dress each junction area / BR & Pump Out 73 20867 9.3 Pump out for liner 74 20867 9.4 LD Cleanout BHA / MU 4-1/2" slotted liner / RIH on 5-1/2" DP 75 20867 9.4 Run liner to TD / set hanger & packer / circ well to brine 76 20867 9.2 Circ Well to Completion Brine / POOH / LDDP 77 20867 9.25 LDDP / RU and run 3-1/2" tubing upper completion 78 20867 9.25 RIH w/ 3-1/2" tubing upper completion & accessories 79 20867 9.25 RIH w/ 3-1/2" tubing / land same / shear valve / test SSSV - OK 80 20867 9.25 LD landing joint / set TWC / clean BOP stack / remove BOP 81 20867 9.25 Remove adapter spool / NU & pressure test tree / Slickline work 82 20867 9.25 Turn well over to production / install GLV / cold stack rig 83 20867 9.25 Set Top Drive in shipping cradle / cold stack rig 84 H04 Fishbone Well Naming & Numbering Index Well Name PTD No. from AOGCC API No. from AOGCC Final TO (MD) Notes H04 Mainbore 218-126 50-231-20064-00-00 20867 Final completed wellbore with 4-1/2" slotted liner in 8-1/2" hole H04-LO3 218-127 50-231-20064-60-00 17200 8-1/2" Open Hole completion 1-104-1.02 218-128 50-231-20064-61-00 18230 8-1/2" Open Hole completion 1-104-1-03 218-129 50-231-20064-62-00 19017 8-1/2" Open Hole completion 1-104-1.04 218-130 50-231-20064-63-00 20094 8-1/2" Open Hole completion H04 -LOS 218-131 50-231-20064-64-00 20735 8-1/2" Open Hole completion 1-104-1-06 218-132 50-231-20064-65-00 21358 8-1/2" Open Hole completion 1-104-1.07 218-133 50-231-20064-66-00 21966 8-1/2" Open Hole completion KOP TO Actual Lateral Lateral Planned Actual Actual Footage Volume (bbls) H04 Mainbore 15479 20867 5388 378 LO1 16382 16060 17200 1140 80 L02 17180 16860 18230 1370 96 L03 17980 17690 19017 1327 93 L04 18780 18440 20094 1654 116 L05 19580 19220 20735 1515 106 L06 20382 20038 21358 1320 93 L07 21180 20820 21966 1146 80 Total 14860 1043 Top Prod Interval TPI NAD 27 TD NAD 27 MD X Y Govt Sea MD % Y Govt Sect H-04 15406 156626.45 2148387.65 318' FSL, 3275' FEL, Sec. 33, T3S, R15W SM 20867 152064.83 2151357.51 3158' FSL, 2634' FEL, Sec. 32, T3S, R15W SM H -04-L01 16060 156047.05 2148669.5 584' FSL, 3862' FEL, Sec. 33, T3S, R15W SM 17200 155176.67 2149306.03 1196' FSL, 4749' FEL, Sec. 33, T3S, R15W SM H -04-L02 16860 155369.4 2149093.85 989' FSL, 4551' FEL, Sec. 33, T3S, R15W SM 18230 154323.31 2149854.92 1720' FSL, 335' FEL, Sec. 32, T3S, R1SW SM H -04-L03 17690 154696.95 2149580.21 1456' FSL, 5236' FEL, Sec. 33, T3S, R15W SM 19017 153688.88 2150327.54 2175' FSL, 982' FEL, Sec. 32, T3S, R15W SM H-04-LD4 18440 154082.59 2150009.61 1868' FSL, 580' FEL, Sec. 32, T3S, R15W SM 20094 152790.62 2150874.58 2696' FSL, 1895' FEL, Sec. 32, T3S, R15W SM H -04-L05 19220 153431.59 2150438.89 2279' FSL, 1242' FEL, Sec. 32, T3S, R15W SM 20735 152250.73 2151247.85 3054' FSL, 2445' FEL, Sec. 32, T3S, R15W SM H -04-L06 20038 152750.51 2150891.73 2712' FSL, 1936' FEL, Sec. 32, T3S, R15W SM 21358 151719.8 2151598.67 3390' FSL, 2985' FEL, Sec. 32, T3S, R15W SM H -04-L07 208201 152104.111 2151331.71 3134' FSL, 2594' FEL, Sec. 32, T3S, R15W SM 219661 151206.781 2151953.08 3729' FSL, 3508' FEL, Sec. 32, T3S, R15W SM �1l+1�� rtry VV74 1 aw' 2-1(&' 129 0��IU IVABORs / cANAIG RECEIVED MAR 2 6 2019 Dry Sample Boxes) Main, q' API: 50-231-20064-00-00 (Shipping Box #2 - 5 Dry Sample Boxes) Main, API: 50-231-20064-00-00 (Shipping Box #3- 7 Dry Sample Boxes) 1-01, 1-02, 1-03, L04, 1-05, 1-06, L07 API: 50-231-20064-60-00, 61-00, 62-00, 63-00, 64-00, 65-00, 66-00 TD: 2/19/2019 Set , l7( Main (11 Boxes, 504 Envelopes) Operator: BLC Crest Alaska Operating Date: 2/20/2019 (2q L03 (1 BOX & 44 Envelopes) (3 p L04 (1 BOX & 55 Envelopes) Well Name: H04 - Main, 1-01, L02, L03, 1-04, 1-05, 1-06, 1-07 Prepared By: Benjamin Handley/ Barbara Delaney 133 Kenai Peninsula Borough, 17690'- 19017' TD 333 W 7th Ave, Suite 100 Location: Alaska Shipping: Anchorage, AK 99501 Washed and Dried Hansen Field 19220'- 20735' TD Attn: Meredith Guhl (907)739-1235 Dry Sample Boxes) Main, q' API: 50-231-20064-00-00 (Shipping Box #2 - 5 Dry Sample Boxes) Main, API: 50-231-20064-00-00 (Shipping Box #3- 7 Dry Sample Boxes) 1-01, 1-02, 1-03, L04, 1-05, 1-06, L07 API: 50-231-20064-60-00, 61-00, 62-00, 63-00, 64-00, 65-00, 66-00 TD: 2/19/2019 Type Set , l7( Main (11 Boxes, 504 Envelopes) l7l 1-01 (1 BOX & 39 Envelopes) �?g L02 (1 BOX & 46 Envelopes) (2q L03 (1 BOX & 44 Envelopes) (3 p L04 (1 BOX & 55 Envelopes) l 3 i L05 (1 BOX & 51 Envelopes) l3 L06 (1 BOX & 46 Envelopes) 133 L07 (1 BOX & 39 Envelopes) 17690'- 19017' TD Total Number of Type Frequency Interval (Feet/ MD) Washed and Dried 30' 5810'- 20867' TD 103 Washed and Dried 30' 16040' - 17200' TD 130,4 Washed and Dried 30' 16850'- 18230' TD 005 Washed and Dried 30' 17690'- 19017' TD qo& Washed and Dried 30' 18440'- 20094' TD (qo-} Washed and Dried 30' 19220'- 20735' TD 1906 Washed and Dried 30' 19988'- 21358' TD 1-4b9 Washed and Dried 30' 20827'- 21966' TD 1-4 tD imple Boxes: 18 & Total Number of Enveloues: 824 Number of Dry Sample Boxes: 18 Packaged into 3 Large Shipping Boxes 'Shipping Box #1: H04 Main Well Bore (6 Dry Sample Boxes) 0 Number of Envelopes: 283 solo* To 1,4500 Shipping Box #2: H04 Main Well Bore (5 Dry Sample Boxes) Number of Envelopes: 221 Shipping Box #3: 11041-01, 11041-02, 11041-03, 11041-04, H041-05, H041-06, H041-07 (7 Dry Sample Boxes) Number of Envelopes: 320 BLUECREST RIG #1 / JOB #: A1744 / WELL: H04 - Main, L01, L02, L03, L04, L05, L06, L07 THE STATE °fALASKA GOVERNOR BILL WALKER Larry Burgess Alaska Manager BlueCrest Alaska Operating, LLC 3301 C Street, Suite 202 Anchorage, AK 99503 Re: Hansen Field, Undefined Oil Pool, H04 -L03 BlueCrest Alaska Operating, LLC Permit to Drill Number: 218-129 Alaska Oil and Gas Conservation Commission Surface Location: 2173' FSL, 1552' FEL, SEC. 2, T4S, R15W, SM Bottomhole Location: 2258' FSL, 1177' FEL, SEC. 32, T3S, R15W, SM 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279 1433 Fax: 907.276.7542 www.aogcc.olaska.gov Dear Mr. Burgess: Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit 218-126, API No. 50-231-20064-22- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair DATED this l day of November, 2018. STATE OF ALASKA ALA A OIL AND GAS CONSERVATION COMMIS N PERMIT TO DRILL 20 AAC 25.005 7a. Type of rk: ib. Proposed Well Class: ❑Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill Lateral' tretigrephic Test- v Development -Oil ❑Service-Winj ❑ Single Zone Q Coalbed Gas E] Gas Hydrates Redrill Reentry xploretory - Oil Development -Gas Service - Supply ❑ Multiple Zone ❑ Geothermal E] Shale Gas 2. Operator Name: 5. Bond: Blanket . Q Single Well ❑ 11. Well Name and Number: BlueCrest Alaska Operating LLC Bond No. 5511251547. 1104 • L03 , 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 3301 "C" Street, Suite 202, Anchorage, AK 99503 MD: 19,250' TVD: 6,613' Hansen, Undefined Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 2173' FSL, 1552' FEL, Sec. 2, T4S, R15W SM ADL 18790, ADL 384403, Fee -Hansen Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 1433' FSL, 5158' FEL, Sec. 33, T3S, R1 5W SM LOCI 14-007 11/15/2018 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 2258' FSL, 1177' FEL, Sec. 32, T3S, R15W SM 14423 3216' (YO1664) 41b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 180.5 15. Distance to Nearest Well Open Surface: x-168813 y- 2144623.035 Zone- 4 GL / BF Elevation above MSL (ft): 145.25 to Same Pool: 2647' - H1AL1 16. Deviated wells: Kickoff depth: 17609 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 115 degrees Downhole: 3,549 psi . Surface: 2,842 psi (using 7,070' TVD) 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling I Length MD TVD MD TVD (including stage data) Driven 20 0.5" wall A252 Welded 152 41 41 193 193 N/A - Rotary Drilled / Driven 17.5 13.375 72 L-80 BTC 5583 40 40 5623 3531 Lead: 715 bbls, 12.0 ppg Tail: 167 bbls 15.8 ppg Class G 12.25 9.625 47 Pilo Hyd 563 15443 38 38 15481 7067 Tail: 132 bbls, 15.8 ppg Class G TOC: 13,981' MD / 6,546' TVD L 3 O L•SZ 661.3 8.5 4.5 1 15.2 Pilo Hyd 563 6741 15381 7042 22122 7063 Slotted Liner - No Cement; 100' lap 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ff): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): N/A Perforation Depth TVD (ft): N/A Hydraulic Fracture planned? Yes ❑ No ❑✓ 20. Attachments: Property Plat O BOP Sketch Drilling Program Time v. Depth Plot Shallow Hazard Analysis Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Thomas McKay Authorized Name: Larry Burgess Contact Email: lom.mckayObluecresteneray.com Authorized Title: Alaska Manager Contact Phone: 907-754-9566 Authorized Signature: Date: 11 -Oct -18 Commission Use Only Permit to Drill �7 j� b "-1 z- API Number: `� Permit Approval See cover letter for other Number: LC 50- " J (J� z ate: I 1 , a requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: Other:�f /J� �i -� 5�� J Li Samples req'd: Yes E]No � Mud log req'd: Ye s �s HzS measures: Yes ❑ No © Directional svy req'd: es Spacing exception req'd: Yes J No [.� Inclination -only svy req'd: Yes QJo Post initial injection MIT req'd: Yes QJo APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: 0r le -S-16 Submit Form and �'Oo rm 10-401 Revised 51201 This permit is valid jet 2"opt�fr�r� J die df approval per 20 AAC 25.0 ) An�ms in Duplicate e - toueNest Energy 3301 C Street, Suite 202, Anchorage, AK 99503 Thomas W. McKay, P.E. Phone: (907) 754-9566 Email: tom.mckay@bluecrestenergy.com October 11, 2018 Alaska Oil and Gas Conservation Commission 333 West 71" Avenue, Suite 100 Anchorage, Alaska 99501 Cosmopolitan Project RE: Application for Permit to Drill: Horizontal Production Well H04-1-03 Fishbone Multilateral Producer Form 10-401; Fishbone Multilateral Well Design Dear Commissioners, BlueCrest Alaska Operating LLC hereby applies for a Permit to Drill for the onshore horizontal production well H04 -L03 — Fishbone Lateral Producer. This well will be drilled and completed using BlueCrest Rig #1. The planned spud date could be as early as 15 Nov 2018. 1-104-1-03 will be a reservoir present on this Lease. The 1-104-1-03 lateral well will be part of a grass roots producer drilled from the H04 slot. The H04 Fishbone Producer well will not be fracture stimulated but instead will rely on the seven (7) rib wellbores like 1-104-1-03 to drain the hydrocarbon fluids, etc. into the main bore which will be cased with a 4-1/2" slotted liner. The well will be completed with 3-1/2" upper completion tubing and lifted using gas lift as needed. Please find attached for the review of the Commission form 10-401, and the information required by 20 ACC 25.005 for this well. Please note that the eight (8) total Spacing Exceptions for this H04 well and its laterals have already been submitted to the AOGCC. Also note that seven (7) additional APD packages such as this one attached for H04-1-03 will be submitted for each well "rib" numbered L01 through L07, which are proposed to be open hole sidetracks off the mainbore. As per AOGCC regulations, each rib requires its own unique name and APD. If you have any questions or require further information, please do not hesitate to contact Tom McKay at 907-754-9566 (office) or 907-350-9544 (cell). Sincerely Larry Burgess ' Alaska Manager BlueCrest Alaska Operating LLC 1ue est Energy Cosmopolitan Project H04 BlueCrest H04 Fishbone APD Package - Main Bore+ Fishbone Lower Laterals Section Topic A Cover Letter B APD Table of Contents C Form 10-401 1 Well Name 2 Location Summary 3 BOPE Information 4-a Drilling Hazards Information 4-b Pressure Model Plot 4-c Drilling Hazards Summary 5 LOT/FIT Procedure 6 Casing & Cementing Program 7 Diverter System Information 8 Drilling Fluid Program 9 Abnormally Pressured Formation Information 10 Seismic Analysis 11 Seabed Condition Analysis 12 Evidence of Bonding 13 Proposed Drilling Program 14 Discussion of Mud & Cuttings Disposal and Annular Disposal 15 Attachments 15-1 Drilling Procedure - Proposed Drilling Program 15-1a Wellbore Schematic - Cross Sectional Color View 15-1b Wellbore Schematic - Excel Section Review 15-1c Wellbore Schematic - Visio Version 15-2 Directional Plan 15-3 Casing Design & Cement Volume Calculations 15-4 Formation Integrity & LOT Procedures 15-5 BOP & Choke Manifold Configuration 15-6 Wellhead & Tree Configuration 15-7 Diverter Configuration & Schematics 15-8 H04 Lease Map 15-9 H04 As -Built Surface Slot Location 15-10 H04 New Well Rig Elevation Form L m N tD W N lD H ;i M 00 G O V G M W G G C lCn M C G N N N co G N 00 n N 7 N N M m N N .-i m m .-i V N ry V00 'D W 7 N 00 lD m Ln 0 0~0 0 V r c Ln N v ono m ri a N N of 00 a m N H n N N O N e -I o N N � e -I N 0 N iN-I r-1 N O m O O ti W N N N N N N N 0�0 N N N N N 'n-1 ID ,HD-1 M O .n-1 Ql 77 m N 00 0) m m m O a m 'iLq '-i m m m m v v tri m v v v v tmn 000 000 v m V~1 lW0 N V�1 m m N I? T m ICT F- 19TT F- F- LP�� H N N N N N N N M N N M N N N N N N N N N M m m M M M m M M M M M M (N w v D m D N n m D N u T U u m w w m u v N w w V w w w w O M O M 00 M 00 N V N .--1 N m e r< m 0 N M 4 tD Ni M O M n W J m N N J J M J O J J N J J m J J J W V1 J J 00 W W N J W rl W W O W W O W W W LL W W e -i ll LL cT W LL LL LL LL LL W LL LL N lD N N N .--I 00 tD N N N N Vt Vi N N V'1 N Zn N 00 N N N 00 N N N m V01 .-� m N V ti r-1 co N t7 00 O to N co V a V m N tD W N lD H ;i M 00 V O V I M W l0 I, m I M N N N 00 MO co N V 00 n ti 7 N m M m N N .-i m m .-i V ti ry V00 'D W tlt N 00 lD m tD 0 0~0 0 V r c W N v ono m ri a N N of 00 a m oN v n o O ti 00 o v N � m m 0 0) a o 00 O m O O ti W N N N N N N N 0�0 N N N N N 'n-1 ID ,HD-1 M O .n-1 Ql 77 m N 00 0) m m m O a m 'iLq '-i m m m m v v n m v v v v tmn 000 000 v m V~1 lW0 N V�1 m m N I? T m ICT 19TT LP�� m N tD W N lD H ;i n N n I °N° I I I I l0 I I I OO w N d' o . MO n a V -� n ti N m ry m N N m kq m m ^ V 00 V00 'D W tlt N 00 lD m tD -i lD N Cr! c o C' v m Ul ri V N of 00 a m oN v n tD O cn 00 m 0 N .� n m 0 v a o 00 O m O O ti W O N N N N N N N N N O N 00 ID M O tD VI V N 00 0) m m m O m O O N H N v v n v v v v a N v N N 191.0 N N T T N I? T m N tD W V T N 7 V n n co n l0 V n m N d' MO Oc-I V ct Ct m V N V kq V ^ V 00 V00 V r,:N 'f1 n rl m mN lD m C' V Ul V N c6 N m w v n tD O 00 m N .� m �D a n (P �D m 0 N tD W O to ct O m N K m 00 O N 00 ID M O tD VI V N 00 0) m m m O m O O N H N v v n v v v v a N v N N N N N N V H N N N N N N N N N N N N N N N N T v D m D N n m D N T n m v m m N V n N M M O M O M 00 M 00 N V N .--1 N m e r< m 0 N M 4 tD Ni M O M n W m N N Ct tD M 00 O tD N i� m N m V1 N 00 C N V rl m N O O O V cf e -i 00 cT W N tp N lD N N N .--I 00 tD N N N N Vt Vi N N V'1 N N N N N N N H X C C C O 0 O O O O 0 O O O v u u u u v v C O O O O O O O O O u `0 O O o O o O O O J a a a a a a a a 0 H h r H H H H ru0 m 3 u o O o O o O a O o O O O O O o F- Y {- Y F- Y F- Y F- Y F - 0J a s a s a s a s a s a s a s w,y �--� �y e -i H N N N M m V V N N LD lD N 0 0 0 o 0 0 0 0 0 0 0 0 0 0 v v 0 0 0 0 0 0 0 CD 0 0 Vv 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 x x x x x x x x x x x x x x x x x x Wellbore Nearest Producing Well Distance To Nearest Producer (ft) Nearest Property Line Distance (ft) H04 Hansen 1AL1 2590 Y01664 543 H04-LO1 Hansen IAL1 2590 Y01664 4866 H04-LO2 Hansen 1AL1 2590 Y01664 4010 H04-LO3 Hansen 1AL1 2647 Y01664 3216 H04-LO4 Hansen IAL1 2842 Y01664 2493 H04405 Hansen 1AL1 2964 Y01664 1831 H04-LO6 Hansen 1AL1 2955 Y01664 1209 H04-LO7 Hansen 1AL1 2951 Y01664 660 lust Energy Application for Permit to Drill Document Cosmopolitan Project H04 -L03 10-401 APD Discussion Sections Horizontal Multilateral Producer H04 — L03 Fishbone Lateral Table of Contents 1. Well Name...................................................................................................................3 Requirements of 20 AAC25.005(f)..............................................................................................................3 2. Location Summary........................................................................................................3 Requirements of 20 AAC 25.005(c)(2).......................................................................................................... 3 Requirements of 20 AAC 25.050(b).............................................................................................................. 3 3. Blowout Prevention Equipment Information..................................................................4 Requirements of 20 AAC 25.005(c)(3).......................................................................................................... 4 4. Drilling Hazards Information.........................................................................................4 Requirements of 20 AAC 25.005 (c)(4)......................................................................................................... 4 Drilling Hazards Summary: ..... ...................................................... .................................................... 6 S. Procedure for Conducting Formation Integrity Tests.......................................................7 Requirements of 20AAC25.005 (c)(5).........................................................................................................7 6. Casing and Cementing Program.....................................................................................7 Requirements of 20 AAC 25.005(c)(6).......................................................................................................... 7 7. Diverter System Information .........................................................................................7 Requirements of 20 AAC 25.005(c)(7).......................................................................................................... 7 8. Drilling Fluid Program...................................................................................................8 Requirements of 20 AAC 25.005(c)(8).......................................................................................................... 8 9. Abnormally Pressured Formation Information................................................................8 Requirements of 20 AAC 25.005 (c)(9)......................................................................................................... 8 10. Seismic Analysis...........................................................................................................8 Requirements of 20 AAC 25.005 (c)(10)....................................................................................................... 8 11. Seabed Condition Analysis............................................................................................8 Requirements of 20 AAC 25.005 (c)(11)....................................................................................................... 8 12. Evidence of Bonding.....................................................................................................9 Requirements of 20 AAC 25.005 (c)(12)....................................................................................................... 9 13. Proposed Drilling Program............................................................................................9 Requirements of 20 AAC 25.005 (c)(13)....................................................................................................... 9 11Page H04 -L03 10-401 APD Discussion Sections r Cosmopolitan Project H04 -L03_10-401 APD Discussion Sections 14. Discussion of Mud and Cuttings Disposal and Annular Disposal.......................................9 Requirements of 20 AAC 25.005 (c)(14)....................................................................................................... 9 15. Attachments................................................................................................................9 Attachment1 Drilling Procedure................................................................................................................. 9 Attachment2 Directional Plan.................................................................................................................... 9 Attachment 3 Casing Design Calculations.................................................................................................... 9 Attachment 4 Formation Integrity And Leak Off Test Procedure..................................................................... 9 Attachment 5 BOP & Choke Manifold Configuration.....................................................................................9 Attachment 6 Wellhead & Tree Configuration..............................................................................................9 Attachment 7 Diverter Schematics.............................................................................................................. 9 Attachment8 Lease Map....................................................................................................................................... 9 Attachment9 As -Built Slot Survey..........................................................................................................................9 Attachment 10 New Well Elevation Form.............................................................................................................. 9 2 1 P a g e H04 -L03 10-401 APD Discussion Sections �I t31ueNst Energy Cosmopolitan Project H04-1-0310-401 APD Discussion Sections 1. Well Name Requirements of 20 AAC 25.005 (f) Each well must be identified by a unique name designated by the operator and o unique API number assigned by the commission under 20AAC 25.040(6). For a well with multiple well branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. Well Name: 1-104-1-03 Fishbone Lateral To include the H04-1-03 fishbone lateral drilling and completion only. NOTE: This well will be proposed as a "fishbone' design with a mainbore named as H04, and seven (7) open hole "barefoot" laterals drilled by open hole sidetrack from the mainbore to be named as: H04-1-01, 1-104-1-02, H04-1.03, H04 - L04, H04-1-05, H04-LO6, and 1-104-1.07. The seven (7) laterals or "ribs" will be drilled upward into all the Hemlock and Starichkof reservoir layers at an inclination of 115 degrees, and each will have its own APD package to be submitted. This particular package (H04-LO3) is for the H04-1-03 drilling and completion operations only. 2. Location Summary Requirements of 20 AAC25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (2) a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration, - (C) the proposed depth of the well at the top of each objective formation and at total depth; (D) other information required by 10 AA 25.050(6); Location at Top of Productive Interval Location at Surface 2173' FSL, 1552' FEL, Sec. 02, T4S, R15W SM Measured Depth, RKB: 17,609' ASP Zone 4 NA D 27 coordinates Northing: 2,144,623.035' Easting: 168,812.804' RKB Elevation 180.50'AMSL Pad Elevation 145.25'AMSL Location at Top of Productive Interval 1433' FSL, 5158' FEL, Sec. 33, T3S, R15W SM ASP Zone 4 NAD 17 Coordinates Northing: 2,149,555.27' Easting: 154,774.06' Measured Depth, RKB: 17,609' Total Vertical Depth, RKB: 7,128' Total Vertical Depth, 55: 6,952' Location at Total Depth 2258' FSL, 1177' FEL, Sec. 32, T3S, R15W SM ASP Zone 4 NAD 27 Coordinates Northing: 2,150,416.47' Easting: 153,496.35' Measured Depth, RKB: 19,250' Total Vertical Depth, RKB: 6,613' Total Vertical Depth, 55: 6,437' Requirements of 20 AAC25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plot, drawn to o suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 100 feet of any portion of the proposed well, Please see Attachment 2: Directional Plan Please see Attachments 7-8: Diverter Schematics / Lease Map (2) for all wells within 200 feet of the proposed wellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished a copy of the application by certified moil; or (B) state that the applicant is the only affected owner. The Applicant is the only affected owner. 31 Pa g H04 -L0310-401 APD Discussion Sections lue est Energy cosmopolitan Project 1-104-1-0310-401 APD Discussion Sections 3. Blowout Prevention Equipment Information Requirements of 20 AAC25.005(c)(3) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPE) as required by 20AAC 15.035, 10AAC25.036, or 20AAC25.037, as applicable; Please see Attachment 5: BOP & Choke Manifold Configuration 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximum downhole pressure that may be encountered, criteria used to determine it, and maximum potential surface pressure based on a methane gradient, The expected reservoir pressure in the Starichkof / Hemlock Sands is -0.472 psi/ft, or 9.07 ppg EMW at 6,951' TVDss taken per MDT's on Cosmopolitan 1. The maximum known pressure in the upper Kenai sands is 9.66 ppg @ 3,841' TVDss per MDT's taken on Cosmopolitan 1. To be conservative, the highest pressure gradient of 9.66 ppg or 0.502 psi/ft will be used to determine MPSP at the production interval of 6,900' TVDss. The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.10), and the planned vertical depth of the Starichkof / Hemlock formation is: MPSP=(6,900TVDss) (0.502 - 0.1 psi/ft) =2,774 psi MPSP=(7,070TVD) (0.502 — 0.1 psi/ft) =2,842 psi (using TVD instead of TVDss for this calculation) MAX BHP=(7,070TVD) (0.502 psi/ft) =3,549 psi (using TVD instead of TVDss for this calculation) 0) data on potential gas zones; The Sterling, Beluga and Tyonek sands within the Kenai group have been known to contain gas. The intermediate section ( will be drilled with a minimum mud weight of 10.5 ppg, the maximum known pressure through these sections is 9.66 ppg @ 3,841' TVDss per MDT's taken on Cosmopolitan 1. (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see the Drilling Hazards Overview below. 41Page H04-1-0310-401 APD Discussion Sections tSlue(,iest Energy 111 111 4000 N p 5000 ll�or000 Cosmopolitan Project 1-104-1-0310-401 APD Discussion Sections Pressure Model (EMW) UpperTyonek, 3292.44 Lower Tyonek, 6059.01 Starichkof, 6874.84 Hem lock, 6902.77 8000 8 9 10 11 12 13 14 15 16 17 18 19 20 EMW (PPG) —Lithostatic Stress • MDT Data —Frac Gradient —Moving Average —Planned Mud Weight 51Paga H04-1.0310-401 APD Discussion Sections Iil ueNesr Energy Drilling Hazards Summary: 17-%" Hole Section / 13-%" Casing Cosmopolitan Project H04-1-0310-401 APD Discussion Sections Event Risk Level Mitigation Strategy Clay Balling Maintain planned mud parameters, Increase mud weight, use Lost Circulation Low weighted sweeps, reduce fluid viscosity, control ROP. Abnormal Pressure in LCM pills, lost circulation material. Surface Formations Low Diverter drills, increased mud weight. Directional Control LOW BHA design, on -sight geologic review, avoid "drilling the line". Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use Tight Hole of low density cement slurries, control running speeds. 12-%" Hole Section / 9-%" Casing Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost Circulation Low circulating density (ECD) monitoring, mud rheology, Pre -planned LCM pills, lost circulation material. Hole swabbing on Reduced trip speeds, mud properties, proper hole filling, real time trips LOW equivalent circulating density (ECD) monitoring, weighted sweeps. Sloughing Coals, Low Increased mud density and fluid composition according to plan, Tight Hole controlled trip speeds, ECD monitoring, optimized hydraulics for Pressure Low hole cleaning. Abnormal Reservoir Low H2S drills, detection systems, alarms, standard well control Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide Gas Low HZS drills, detection systems, alarms, standard well control practices, mud scavengers. 8-%" Hole Section / 5-W Slotted Liner Event Risk Level Mitigation Strategy Fluid density according to plan, reduced pump rates, reduced trip Lost Circulation low speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material. Hole swabbing on Reduced trip speeds, mud properties, proper hole filling, real time trips LOW equivalent circulating density (ECD) monitoring, weighted sweeps. Directional Control Low BHA design, on -sight geologic review. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide Gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers. 6 1 P a g e H04 -L03 10-401 APD Discussion Sections nue sit Energy Cosmopolitan Project 1-104-1-03_10-401 APD Discussion Sections S. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC 25.005 (c)(5) An application for a Permit to Drill must be accompanied by each of the following items, except far on item already on file with the commission and identified in the application: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.030(f); Please see Attachment 4: Formation Integrity and Leak Off Test Procedure – N/A for Fishbone Open Hole Laterals 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 10 AAC 25.030, and a description of any slotted liner, pre -perforated liner, or screen to be installed,' NOTE: INFORMATION IN THIS SECTION REFERS TO THE H04 MAINBORE ONLY Casing and Cementing Program See also Attachment 4: Cement Volume Calculation Summary Csglrbg Hole size Weight Grade Conn Length Top MD17VD Btm MD/ND Cement Program OD (in) (in) (Ib/ft) (R) (ft) (ft) 20" N/A .5001 A525 Weld 152' 41'/41' 193'/ 193' N/A Wal 5,623'/ 882 TOTAL BBIS 13-3/8' 17-1/2" 72 L-80 BTC 5,583' 40'/40' LEAD: 572 bbls 12.00 ppg Kenai Lead 3,531' TAIL: 167 bbls 15.8 ppg Class "G" 9-5/8" 12-1/4" 47 P-110 Hydril563 15,443' 38'/38' 15,481'/ 132 TOTAL BBLS "G" 7,067' TAIL: 132 bbls 15.8 ppg Class TOC: 13,981' MD/ 6,546' ND No cement required 4 -1/2" 8-1/2" 15.2 P-110 Hydril563 6,741' 15,381'/ 22,122'/ slotted liner completion 7,042' 7,063' 100' liner lap --T—1 I I I Please see Attachment 3: Casing Design Calculations NOTE: Due to the high inclination at the 9-5/8" intermediate shoe, a tractor would be required to run a CBL/USIT log on this shoe. In addition, since the H04 well is not to be hydraulically fracture stimulated, it is requested that the AOGCC waive the CBL /USIT requirement on the 9-5/8" cement job on the H04 well. 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (7) a diagram and description of the diverter system as required by 20 AAC 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2); Please see Attachment 5: BOP and Choke Manifold Configuration. NOTE: A request and justification to waive the requirement for a diverter system while drilling the H04 surface section will be submitted under a separate cover letter. 71Page H04-1.0310-401 APD Discussion Sections DlueNest Energy Cosmopolitan Project 1-104-1-0310-401 APD Discussion Sections Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) .: 'Ii L,on for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (8) a drilling fluid program, including a diagram and description of the drilling fluid system, as required by 10AAC25.033,- Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Drilling will be done with drilling fluids having the following properties over the listed intervals in the following Table. NOTE: the base case drilling fluid program is to drill the surface section with a fresh water conventional barite based system. The intermediate section will be drilled with a oil based conventional barite mud system. However, based on the results seen in the H14 and H12 flowback production test histories, it is planned to drill the H04 production section using a solids free oil based mud system with no barite, using only salt and calcium carbonate for weighting and bridging material, in order to minimize near wellbore formation damage in the reservoir section. Since the well design does not allow for any type of well stimulation or acid clean up after completion, it is vital for well productivity to drill the reservoir with as light a mud weight as possible, and with as few solids as possible, in an effort to minimize formation damage. Parameter Surface Intermediate Production Type WBM OEM OEM Name Spud Mud VersaPro VersaPro Density (ppg) 9.8 10.5 8.8-9.7 Oil:Water Ratio N/A 80:20 75:25 6/3 RPM 17-20 12-14 8-10 PV (Ibs/100ft) <28 <28 API Fluid Loss (cc/30min) NC HTHP Fluid Loss (cc/30min) <5.0 <5.0 Electric Stability (mlVolts) >600 >600 pH 8.5-9.5 Chlorides <2,000 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) An application for o Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (9) for on exploratory or stratigraphic test well, a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 20 AAC 25.033(f), Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20AAC25.005 (c)(10) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (10) for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.061(a), Not applicable: Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identifred in the application: (11) for a well drilled from an offshore platform, mobile bottom -founded structure, jack-up rig, or floating drilling vessel, an analysis of seabed conditions as required by 20 AAC 25.061(6); Not applicable: Application is not for an offshore well. 8 1 P a g a H04 -L03 10-401 APD Discussion Sections lueC,lest Energy Cosmopolitan Project 1-104-1-0310-401 APD Discussion Sections 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (11) evidence showing that the requirements of 20 AAC 15.025 (Bonding)have been met; Evidence of bonding for BlueCrest Alaska Operating LLC is on file with the Commission. 13. Proposed Drilling Program Requirements of 20AAC25.005 (c)(13) A copy of the proposed drilling program; the drilling program must indicate if a well is proposed for hydraulic fracturing as defined in 20 AAC 25.283(m); to seek approval to perform hydraulic fracturing, a person must make a separate request by submitting an Application for Sundry Approvals (Form 1a 403) with the information required under 20 AAC 25.280 and 20 AAC 15.283; (13) a copy of the proposed drilling program, Please refer to Attachment 1— Drilling Procedure. Note: The H04 well will NOT be hydraulically stimulated. 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC 25.080for an annular disposal operation in the well.; Solid and liquid wastes generated during the drilling process will be disposed of at Hilcorp Alaska, LLC's Kenai Gas Field (KFG) Grind & Injection (G&I) Facility or AIMM Technologies' (hydrokinetics) facility in Kenai. Dried water base cuttings from the surface section are planned to be properly disposed of in a local landfill after being tested using the filter paint test. No annular disposal is planned for this well. 15. Attachments Attachment 1 Drilling Procedure with Wellbore Schematics Attachment 2 Directional Plan Attachment 3 Casing Design and Cement Volume Calculations Attachment 4 Formation Integrity And Leak Off Test Procedure Attachment 5 BOP & Choke Manifold Configuration Attachment 6 Wellhead & Tree Configuration Attachment 7 Diverter Schematics Attachment 8 Lease Map Attachment 9 As Built Slot Survey Attachment 10 New Well Elevation Form 9lPage H04 -L03 10-401 APD Discussion Sections t31 ueNest Energy Attachment 1 Cosmopolitan Project H04-1-0310-401 Fishbone APD Attachments H04 -L.0310-401 Fishbone APD Attachments H04 Fishbone Multilateral Well — Skeleton Procedure for Drilling Reservoir Section The seven (7) ribs of the fishbone production section will be drilled in the following sequence using a 8.8-9.4 ppg low -solids OBM starting mud weight: o Drill the first fishbone rib "L01" up into the Hemlock and Starichkof pay sands as per the APD and directional plan for H12 -LOS. o Circulate cuttings to a point past the BHA. o Backream LO3 rib back to mainbore. Circulate hole clean. o Once back in the mainbore, position the bit and RSS BHA at the open hole sidetrack depth for L02 as directed by the Operations Geologist. o Trench and open hole sidetrack the mainbore to the low side and drill ahead to the kickoff point for the L02 rib. o Repeat the L01 drilling procedure above to drill the L02 rib, and the subsequent ribs L03, L04, LOS, LO6 and L07. o The last rib could be designated as L08 which will simply be a continuation to TO of the mainbore to be drilled under the H04 Mainbore APD. o NOTE: more than one bit run is expected to be required to drill the multiple ribs, and the two-week AOGCC BOP test frequency will also need to be incorporated into the Daily Operations Plan. o Drill the H04 mainbore to TD, and circulate the well clean. o Backream to the 9-5/8" shoe. o Circulate hole clean and cap well as required; prepare to POOH for the 4-1/2" slotted liner. o Backream / POOH on elevators, and lay down BHA. Rig up to run 4-1/2" slotted liner lower completion. Rev 0 T. McKay 08 Oct 2018 2400 3200 4000 4800 5800 6400 7200 8000 8800 9800 10400 11200 o t� N tFfy O_ rTj w FOj $' CNN' w: CS �= Ed �= F� S \ 2400 3200 4000 4800 5800 8400 7200 8000 8800 9600 10400 11200 H04 Multi -Lateral 0 500 1000 1500 2M 25MUS Sca/e Date 1:12500 10/10/2018 1:12500 ZSvfe Prepared by. 13 ebuchenen Reid COIIIIOpOIlU9n PETRFI Last Updated: TWM, 09 Oct 2018 ^193' MD/TVD Drilled In Bit: 17-1/2" PDC Bit RSS: PDX6 MWD: PowerPulse LWD: arcVI51ON (GR/RES) 17-1/2" 15.8 ppg Class G Tail Open Hole Bit: 12-1/4" PDC RSS: Xceed 675 12-1/4" MWD: PowerPulse Open Hole LWD: arcVI51ON (GR/RES) 15,481' MD / 7,067' TVD (Lower Lat) Bit: 8-1/2" PDC RSS: Xceed 675 MWD: Telescope 8-1/2" LWD: GeoSphere Open Hale 15.8 ppg Class G Tail adnVISION H04 Fishbone Production Well (Main Bore/ Lower Lateral/ Starichkof / Hemlock PrimaryTarget) J 3-1/2" Production Tubing to Surface GLM's / SSSV / DH Gauges / CIM PaLiner HgrLiner Top Packer 1 I 9-5/8" 47## P110 H563 1 I I I I I I I I I I I I I I 4-1/2" 15.2# P110 H563 Slotted Liner JUn -Cemented Slotted Liner Completion in Mainbore 12.0 ppg Lead 715 bb1s WBM 25% Excess 9.8-10.0 ppg Spud Mud Top of Tail 4,623' MD 15.8 ppg Class G Tail 167 bbis 25% Excess Incl 69 deg TOC @ 13,981' MD 15.8 ppg Class G 132 bbis 50% Excess OEM 10.5 ppg VersaPro Incl 77 deg OBM Un -cemented 8.8-9.7 ppg VersaPro Slotted Uner I Frac's Max Incl 115 deg Azim 302.4 dee T. McKay, 28Sept2018 H04 Lower Lateral Completion with 20" Conductor Slotted Liner in Mainbore and Seven to be set @ 152' BGL (7) Open Hole Fishbone Ribs 13-3/8" 72# L80 BTC @ 5623' MD 3%" 9.3# IBT-MOD Production Tubing 4-%"x 9-5/8" Liner Hanger & Liner Top Packer 9-5/81'47.0/53.5# N80/P130 H563 @ 15481' MD Ilue est Energy Fishbone ribs are 8-%" open holes spaced approx every 800' with 4-Yz" slotted liner run in the mainbore after the seven ribs are drilled; ribs are drilled in order from L01 to L07 using open hole sidetracks to initiate each rib; ribs penetrate all layers of Starichkof and Hemlock pay sands 1.O1 L02 L03 L04 LOS L06 L07 4-'/z" 15.2# H563 Slotted Liner @ 22122' MD 1S1 uCNest Energy Attachment Cosmopolitan Project H04-1-0310-401 Fishbone APD Attachments H04 -L03 10-401 Fishbone APD Attachments �C,rest 1-104-1-03 (P1) Proposal Geodetic Report > MIm Energy (DIN Plan) L Blue ndmt Veri Section Azimuth: 291.000°(True North) TVDSS Cosmopolitan Unit VmfivW S.Airm Origin: "Do ft, O.000ft .lure lSid: C.mopolibn Pad/X-04 ° F TVD Reenumm Datum: EYCluei.n Zone Zone H00 ��� i Northing abo�e IASL 180 WO ft50 bat.: Hoa-La3 G Ibil GVD nJElandsEllmmtlon: ft above MSL Ifl) 50231xxxxx82 ■ Magnetic Declination: 14,510- • Na.: 1-104.1.03 Doll Total Gravity Flold SNanglh: 1001.2613mgn(9.80665 sand) •Data: Sepbmber24,2018 Gm K'Modal: DOX AHD I D01 I ERD Rano: 136.668 ° 116487.726 ft 16.784 12.313 Total Magnetic Fluid Stranglb: 55009.179 nT dingle Refamoroa Syatam: MD27 Alralm Stab Plane, Zone N. US Feat Mag.6c Dip Angle: ".874° Don Lat I Long: N59° ST291368T, W 151-48' 585554- Dedination Dole: Decembm01.2010 Bon Grid WE YIX: N 2144623.035 WS, E 168812.804 ftUS Mag.tl< Doolmaflon Model: HDGM2018 Grid Conver,mem Arr,W -15582 ° Node Rafa rmm: True North Scab Factor: 1.00002484 add Converge.. Used: 0.0000 ° on I Patch: 2.10.544.0 Total Cort Man North -+True Node: 14,5103- Commands Comment MO In<I Aatm True TVDSS TVD VSEL NS EW TF OLS EYCluei.n Zone Zone GeoMag Th Northing Emitting (°) Ifl) (ft) Ifll (ft) Ifll (°) cDirectionalultyIdex (°11001) OlMcutty Index Alert Angle (nT) (71143) (fti13) RTE 000 0.00 000 -180.50 0.00 0.00 am 0.00 283. N/A 0.00 17.13 16222.50 2144623.04 16881280 100.00 0.00 28300 40.50 100.00 0.00 0.00 0.00 28334 0.00 0.00 17.13 16222.]6 214462304 168812.80 200.00 0.00 283.00 1950 200.00 0.00 000 0.00 283M 0.00 000 17.13 16222.95 2144623.04 168812.80 300.00 0.00 283.00 119.50 300.00 000 000 000 283M 000 0.00 17.13 16223.13 2144623.04 168812.80 Cry 1/100 400.00 0.00 283.00 219.50 40000 0.00 0.00 0.00 283M 0.00 0.00 17.13 16223.32 2144623.04 16881280 503.00 100 28300 319.49 499.99 0.86 030 -0.85 283M 100 000 17.18 16273.61 214462325 16881196 cr,V100 600.00 2.00 283.00 41946 599.96 3.46 0.9 3.40 283M 1.00 0.84 17.29 16375.31 2144623.91 168809.43 70000 4.00 283.00 51932 69982 8.64 1.96 3.50 283M 200 1.54 17.67 16)20.04 2144625.23 168804.36 Crt2.5/100 800.00 600 283.00 61883 799.43 17.27 392 -1699 2.76R 200 202 1626 1346719 2144827,42 16879692 900.00 650 283.82 718.12 898.62 29.78 6.86 -29.26 1.95R 2.50 2.41 19.15 18076.92 2144630.69 16878374 100000 1100 284.26 816.67 997.17 4658 10.98 45.68 1.51R 250 2.71 20.30 19117.41 2144635.25 168767A4 110000 1350 28455 914.39 100689 67,65 1626 -6622 1.24R 2.50 2.97 21.67 2034661 214464109 168747.04 1200.00 1600 28434 1011.09 119159 92.95 2210 -90.05 105R 2,50 3.18 23.22 21724 07 2144640.19 168722.60 1300.00 18.50 284.69 1106.59 1287.09 122.42 30.28 .119.61 0.91R 2.50 3.36 24.91 23213.96 2144656.55 160694.16 1400.00 20se 285.00 1200]0 1381.20 156.01 56.99 -152.14 0.8111 2.50 352 2673 2478577 2144686.15 160661.77 1500.00 2349 285.08 129325 1473.75 193.66 48.82 -186]0 0"R 2.50 367 28.64 26414.05 2144676.96 168625.50 1600.00 2599 205.16 1384.06 1564.56 23530 5973 329.11 ow 2.50 3.80 30.63 28077.70 2144688.98 168585.40 1700.00 2649 28532 147296 1653.46 280.84 71.73 -273.28 061R 2.50 392 3288 29759.22 2144702.17 168541.57 1800.00 30.99 285.27 1559.78 1740.28 330.19 64." 321.15 0,568 2.50 4.03 3 IF9 31444.00 214471651 168494.07 1900.00 3349 285.31 1644.35 1824.85 303.20 98.84 372.61 0.52R 2.50 4.13 36.94 33119.71 2144731.97 168443.02 2000.00 35.99 285.35 1726.51 190701 439.99 11391 -427.56 0.498 2.50 422 3912 31775.83 2144748.53 168388.49 2100.00 WAS 285.39 1806.11 1986.61 500.21 12995 465.92 0481 2.50 431 4134 3640328 2144766.15 160330.59 220000 40.99 285.42 1883.40 2063.50 563.84 14693 547.55 0.44R 2.50 4.39 4358 37994.16 214478480 168269." 230000 43.49 285.44 1957.02 213T.52 630.74 164.81 512.35 0.4211 250 4.47 4584 39541.50 2144804.44 160205.15 2400.00 45.99 265.47 2028.04 2208.54 700.89 18357 380.19 OAR 2.50 4.55 48.12 41039.09 214482504 16813784 250000 48.49 285.49 209592 2276.42 "3.86 203.17 -750.95 0.391 250 462 50.42 42481.38 2144846.56 168067,64 2600.00 50.99 285.52 2160.54 2341.04 849.84 223.57 324.48 0.37R 250 4.68 52.73 43863.38 214486895 167994.69 2700.00 53.49 285.54 2221.6 2402.26 928.54 24413 40085 0.36R 2.50 4.75 5505 45150.57 2144892.17 167919.12 280000 W." 285.55 2279.48 2459.90 1009.82 266.61 -97932 0.35R 2.50 4.81 67.39 4642683 2144918.19 167841.08 2900.00 58.49 28557 2333.59 2514.09 1093.53 289.18 -1060.32 0.34R 250 4.87 5913 47604.46 2144940,94 167760.71 Saloom Go" 28559 238397 2564.47 1179.51 312.37 -114352 0.33R 2.50 4.93 6200 48704.05 214496640 167678.17 310000 63.49 285.61 2430.54 2611.04 1267.61 336.17 -122815 0.321 250 4.98 64.43 49714.55 21"992.50 167593.62 320000 65.93 285.62 247320 2653.70 1357.64 360.50 -1315.85 0.32R 2.50 5.04 66.79 50663.19 214501920 167507.22 3300.00 6849 285.64 251188 2692.30 1449.45 M&M -140485 0.31R 2.50 509 69.16 51517.45 2145046.44 167419.12 End Cry 331437 68.85 28564 2517.11 2697.61 146218 388.95 -141TS4 HS 2.50 5.09 69.50 51633.18 214WWAO 167406,33 340000 68.85 28564 254800 2728.50 1542.29 410.48 -1494.44 HS 000 5.12 69.50 51633.69 214507401 167330.04 3500.00 WAS 285.64 258408 2764.58 1635.14 435.62 -158426 HS 0.00 5.16 69.% 51634.29 2145101.58 167240.94 3600.00 0.85 285.64 2620.15 2000.65 1"8.00 46076 -1674.07 HS 0.00 5.19 Saw 51634.89 2145129.16 167151.84 370000 68.85 28564 265623 2836.73 1820.86 48590 -1763.88 HS 000 5.22 69.50 51635.49 214515613 16706214 380000 68.85 28564 2692.31 2872.81 1913.2 511.04 -1853.70 HIS 000 5.24 6950 51636.08 214510490 16697365 390000 68.85 28564 272638 2900.00 2006.57 53648 -1943.51 H6 000 5.27 69.50 51636.68 2145211.00 16688455 400000 68.85 285.64 2764A6 2944.96 2099.43 561.32 -2033.32 HS 000 530 69.50 51637.28 2145239.45 16679545 410000 6885 285.64 2800.54 296104 219229 WAS .2123.14 HS 0.00 5.32 69.50 51637AT 2145267.02 166706.35 4200.00 68.85 285.64 283661 3017.11 2285.15 61180 -2212.95 HS 000 534 69.50 51638.47 2145294.59 16661715 4300.00 68.85 28664 2072.69 3053.19 2378.00 636.74 .2302.77 HS 0.00 5.36 69.50 51639.OT 2145322.17 166528.15 4400.00 68.85 285.64 2908.77 308927 2470.86 661.80 -2392.58 HS 0.00 539 69.50 51639,66 2145349.74 166439.05 4500.00 68,85 205.64 2914.80 312534 2563.72 687.02 -2482.39 HS 0.00 5.41 69.50 51640.26 2145377.31 166349.95 4600.00 60.85 285.64 2950.92 3161.42 2656.50 712.16 -2572.21 HS 0.00 5.43 69.50 5164086 2145404.89 166260.86 Cosmopolitan Unit\Cosmoplitan PacKH15-P2\H15-P2\H15-P2 (P7) Drilling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:13 PM Page 1 of 4 COmmsn4 Upper Tionek 1338' Cs9 U TmnekO U Twnek H U 7WnekI U riw i MO (ft) Incl (°) A.I. Tme (% NOSE (ft) NO Ifll VSEL Ift) NS (ft) EW Iftl 1F /% OLS PIt00k) DlmpBonal Exclusion Zona Oiflkuky ftMex RIeH Exaluabn Zana AO9k in GOMa97,) InTI NOIMS) (kU5) E(MS) IflUS) 470000 68.85 285.64 3017.00 319T.W 2749.43 ]3).30 -2662.02 HS 000 5.65 69.50 51641.65 3105432.46 ifi61fl JB 400000 68.65 28564 3053.07 3233.57 2842.29 7W," -2751.03 H8 0.00 5.47 69.07 5164205 2145460.03 166171.76 4900.00 6085 285.84 3009.15 3269.65 2835.150.00 2041.65 HS 0.00 548 69.50 5164264 2145407.61 165993.% 5000.00 60.85 285.64 3125.23 3305.73 3020.00 812.71 -2931.46 HS 000 5.07 6907 51643.24 2145515.18 165904.46 51W.W 66.85 285.64 3161.30 3311.80 3120.06 837.85 -302127 HS 0.00 5.9 NM 51643.84 2145562.75 16%15.36 520000 60.85 28564 3197.36 3377.88 3213.72 862." -3111.09 HS 000 553 69,50 51644.43 2145570.33 165726.26 510000 66.85 285.64 323346 3413.96 3WRW 86813 3200.90 HS OW 555 69.5051645.03 214558290 165637.16 51W.W 68.85 285,64K69.53 3450.03 3399.43 913.27 -VN.71 HS 0.00 5.57 691W 51645.62 214%2547 165548.06 541931 66.65 285.64 3278W 345707 3417.37 91813 3308.06 HS 0.0 5.57 0.W 51645)4 2f456W.W 185%O.BB 5500.00 0,85 285.64 3305.61 3486.11 3492.29 938.41 33800 HS 0.00 5.W 69.07 51646.22 214%53.05 1654W.97 %00.00 68.85 28564 3341.69 3522.19 355.15 963.55 3470.34 HS 000 5,07 69.W 51646.82 214%80.62 165369.87 5623.05 was 28564 33W.W 353007 3"655 969.35 3491.04 HS 0.0 5.W 0907 51646.95 21450697 165349.33 5700.00 68.85 285.64 3377,76 3558.26 3878.01 988.69 350.16 HS 000 5.61 69.W 51647.41 2145707.19 165280.77 580000 68.85 285.64 3413.84 3594.34 377086 1013.83 -3649.87 HS O.W 562 69.50 51648.01 21/5735.77 16519167 S9MM 66.85 285.64 3449.92 3630.42 386372 1038.97 -3739.78 HS 0.00 564 Man 51648.0 2145763.31 165102.57 WOO" 68.85 205.64 3485.99 W6649 39%.% 1064.11 3829.60 HS 0.00 585 %IN 5164920 2145790.91 16W1347 6100.07 68.05 28564 3522.07 370257 404944 1089.25 -3919.41 HS 0.00 5.66 69.50 51649.79 214%1649 164924.37 6200.07 68.85 285.64 35%.15 37MS5 4142.29 1114.39 )009.22 HS 0.00 5.68 69.07 5160739 2145846.07 16483527 6300.00 6085 285.64 3594.22 377072 4235.15 113953 4099.04 HS 0.00 5.69 69.W 51607.98 214%73.0 164746.18 6317.13 MM 28564 3800.40 3780.90 4251.05 1143.84 4114.42 H3 O.W 669 89.07 51851.06 214%7835 1647W..92 6400.00 Wes 285.64 3630.311 381080 4328.01 1164.61 4188.65 HS 0.00 5.70 WW 51651.0 214507120 164657.07 6500.07 0.85 285.64 366637 3846.87 420.87 1189.81 427888 HS O.W 5.71 69.07 51652.17 214W28.78 164567." 66MM 6885 265.64 370245 3002.95 4513]2 1214.95 4368.48 HS 0.0 5.72 69.07 51652]6 214075S35 16447866 6700.00 W.85 28564 373853 3919.03 4607.% 1240.09 445S29 HS 0.0 5.74 69.50 51653.36 2145983.92 164389,78 6600.00 66.85 285.64 3774.60 3955.10 4fi0.44 1265.23 451810 HS O.W 575 68.51 51653.95 2146011.5) 164300.07 6900.00 6885 285.64 3810.60 3991.18 479230 1280.37 4637.92 HS 0.00 576 69.51 51654.55 21W".07 16421158 7000.00 6865 285.64 3046.76 4027.26 4885.15 131551 472713 HS 0.00 &A 0.51 5165514 2146066.64 164122.46 7100.00 68.85 285.64 3082.03 4063.33 4978.01 1340.65 4817.54 HS 0.00 578 0.51 51655.73 214609422 164033.39 720007 66.05 285.64 3918.91 4099.41 W70.07 136579 4WTM HS 0.00 5.79 69.51 5165633 2146121.79 16394.29 7300.07 68.85 28564 3954.99 413549 5163.73 1307.93 407.17 HS 000 5.80 6951 516%.92 2146149.36 163855.19 74W.W 68.85 285.64 3991.06 4171.% 52N.% WSW -5086.89 HS 000 5.81 69.51 516520 2146176.94 1637WW 7500.07 6885 20.64 4027.14 4207.64 5349.4 141.21 517607 HS O.W 5.82 6951 51650.11 2146204.51 163676.99 700.W 6B.85 285.64 4%3.22 4243.72 542.30 1466.35 5185.61 HS 0.00 5.83 69.51 51658.70 2146232.0 163%7.89 "W W 0.85 285.64 407929 4279.79 5535.16 1491.49 -5358.43 HS OM 5.64 fi9.51 51659.30 21406 66 163198.79 78W.W 085 285.64 4135.37 431507 %28.01 1516.62 544624 HS 0.00 5.85 69.51 5165S0 214620723 16UO.69 7900.00 68.85 28561 4171.45 4351.95 5720.97 15416 5535.05 HS O.W 5.07 69.51 51660.48 2146314.00 15332007 80O.W 0.85 28561 420752 430.02 %13.73 1556.07 562587 HS O.W 5.87 69.51 61%1.07 2146342.30 16M31 8100.00 6885 285.64 424360 424.10 070658 1592.04 -5715.68 HS OW 587 69.51 51661.67 2106369.95 .W 16314240 820000 6885 285.64 4279.68 440.18 099.44 1617.18 5005.49 HS 0.00 5.88 0.51 51552.26 2146397.52 163053.30 830007 68.85 285.64 4315.75 449625 5092.30 1642.32 -5085.31 HS 0.00 589 0,51 51662.85 2146425.W 162964.20 8400.07 68.85 285.64 4351.83 453233 6185.16 1667.46 -005.12 HS 000 5.80 69.51 $1663.44 2146452.67 16875.10 800.07 66.65 285.64 4387.91 4%8.41 6278.01 16260 5074." HS 0.00 5.91 59.51 51564.64 2146407.24 107WW 8600.07 0.65 285.64 4423.0 4604.48 6370.87 1717.74 $164.75 HS O.W 5.92 051 51664.63 2146W7.81 1626%." 8700.00 60.85 28564 4460.06 4640.55 6463.73 1742.88 5264.% HS 0.00 5.92 6951 5166522 2146535.39 162607.81 8007.00 66.85 28.64 4".14 467664 65%.0 170.02 5344.38 HS 0.00 5.93 69.51 5107581 2146562.96 162518.71 8"0.07 68.0 28564 453221 4712.71 6649.44 1793.16 5434.19 HS O.W 5.94 69.51 516%.40 2146590.53 152429.61 09919 66.65 28564 45WW 4748.W 6741.65 181810 .6523.28 HS OW 5.95 0.51 5188899 214M17W 162341.23 900000 WM 28564 4558.29 4748.79 6742,30 1810.30 504.00 HS OW 5.95 69.51 51666.99 2146610.11 162340.51 9100.00 68.8 28564 4604.37 4784.87 035.16 10434 5613.82 HS O.W 5.95 69.51 St697.% 2148645.68 16225141 9200.00 0,85 285.64 4640.44 4820.94 692802 1068.58 570363 HS OW 5% 69.51 5158.17 2146673.25 16215231 9300.00 085 285.64 4676.52 487.02 7020.87 109372 57934 HS 0.00 5.97 69.51 51668.77 2146707.83 162073.21 940000 6885 28564 4712.60 4893.10 711373 1918.86 5803.26 HS OW 5" N.51 5169.36 2146728.40 161904.11 9WOW 68.85 28564 4740.67 4929.17 7206.6 194.07 57307 HS 0.00 598 0.51 5166895 214675597 161095.01 9W9.86 4.85 28564 4784.70 496520 7299.31 196.10 -7M.78 HS O.W 599 0.51 51670.54 2146763.51 161"604 96W.W 6885 285.64 4784.75 4"5.25 7299.45 1969.14 - W .W HS 000 5.99 69.51 51670.54 2146783.55 161805.92 970.00 WAS 285.64 4820.0 W01.33 702.30 1994.28 -7152.70 HS OW 6.00 59.51 51671.13 2146811.12 161716.82 9800.07 60.85 285.64 4856." 073740 7485.16 201942 -724251 HS O.W 607 5951 51671.72 2145838.69 16107.72 %MM 0.85 285.64 4892.6 073.40 7578.02 2N4,N -733232 HS 0.00 6.01 6951 51672.31 214686627 161538.62 1000000 0.85 28564 4929.06 5109.56 7670.88 206970 -7422.14 HS 0.00 602 6951 51672.90 10107.07 0.85 285.64 4965.13 5145.63 1763.73 2094.84 -751195 HS 0.00 602 2146893.84 161449.52 1020000 58.85 28564 W01.21 518111 78%.59 2119.98 -760176 HS O.W 6.0 69.51 51673.48 214692141 161350.42 1020745 W85 28664 WW.W 5184.40 7863.51 2121.85 -7Wa46 HS OW 6.03 69.51 51674.07 2106948.98 161271.32 10300.07 6885 28564 W37,29 529,99 7949.45 2145.12 7691.58 HS 000 6.04 051 51674.12 214051.4 161264.86 iNW.00 6885 285.64 W73.26 5253.86 804231 2170.26 -7701.38 HS O.W 604 0.51 51674.% 214976W 16118222 100000 6885 28564 51W.4 5289.94 8135.15 2195.40 -0071.21 HS OW 605 69.51 51675.25 214704.13 161093.13 1MMM 68.85 205.64 5145.52 532602 822802 2220.54 -0961.02 HS 000 6.07 0.51 51675.84 2147031.70 161004.03 10700.00 68.65 20564 5181.59 536209 832088 224568 -0050.03 HS OW 607 0.51 51676.43 214705920 150914.93 10000.00 68.85 265.64 521767 5398.17 841373 227081 3140.65 HS OM 607 69.51 69.51 51671.02 51677,61 214706.85 214711042 15082583 16073613 10907.00 68.85 205.64 5253.75 5434.25 BW6." 2295.95 523046 HS 0.00 607 0.51 51678.19 2147142.07 107647.63 11007.00 60.85 285.64 528982 5170.32 859945 232109 5320.27 HS 0.00 6.08 69.51 51678.78 2147169.57 10550.53 11100.0 60.05 285.64 5325" 5506.40 862.31 231623 540.6 HS 0.00 6.08 69.51 51679.37 2147197.14 160469.43 11200.07 0785 285.64 5361." 551248 8785.16 2371.37 5489." HS 0.00 6.09 6951 51679.% 2147224,72 16WW.34 11300.07 66.85 28564 5396.05 078.55 W7602 2396.51 SW9.71 HS O.W 5.09 6951 51600.54 214725229 150291.24 114W.W W.65 285.64 5434.13 5614.63 8970.00 242165 5679.53 HS 0.00 6.10 69.51 51681.13 2147279.86 1W2W.14 11WO.W WAS 285.64 5470.21 %W71 900.74 244679 5769.31 HS O.W 6.11 69.51 51681.72 2147307.44 160113.04 11507.00 07.85 20764 5075.28 5666.78 915S59 2471.0 SBW15 HS 0.0 6.11 69.51 5102.30 2147335.01 750023.91 11700.00 0.85 285,641 042.36 572286 W4945 2497.07 594897 HS 0.00 6.12 69.51 51882.6 2147362.50 159934.84 Cosmopolitan Unit\Cosmoplitan Pao\H75-P2\H15-P2\H75-P2 (P1) Dolling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:13 PM Page 2 of 4 Commend MD Ifl) Incl l9 MineTrue (°) TVO(M 1R) TVD (ft) VSEL IRI HS (ft) EW Inl TF (°) DLS Directional Exclusion Zone /°I1('11M) Olifleulty !odea ANrt Exaluelon An9bZane GeoMag Th W) Ho (MS) IM15) Feeling (RUB) 11800.00 6885 285.64 5578.44 5758.94 9312.31 2522.21 -903678 HB OOU 6,12 69.51 5168348 2147390.16 159045]4 11900.00 San 28564 5614.51 995.01 9435.17 254735 -9128.59 HS 0.00 6.13 6951 516MM 214417.]3 159758.64 12000.00 6685 285.64 5650.69 5031.09 9528.02 2572.49 -921841 HS am 6.13 69.51 51684.65 21444530 15%67.55 12100.00 6885 28564 5686.67 5867.17 9620.88 2597.63 -9308.22 HS am 6.14 69.52 51685.23 21474287 1599845 12200.00 68.85 28564 5722.74 5903.24 9713.74 2622.77 -939804 HS 0.00 6.14 69.52 51605.02 21460045 159489.35 12300.00 fi8.85 28564 958.02 Man 9806.60 264.91 -9487A5 HS 0.00 6.15 69.52 51666.40 214528.02 159400.25 12400.00 68.85 285.64 5794.90 595.40 989945 267305 -9577.66 HS 000 6.15 69.52 51680.99 2147555.59 159311.15 12500.00 was 205.64 5030.97 601147 9992.31 2698.19 -9667.48 HS 000 6.16 69.52 51687.57 214503.17 159222.05 1200000 68.85 285.64 509.05 604.55 10085.17 2723.33 -9757.29 HS 0.00 6.16 69.9 51688.16 2147610.74 159132.95 12700.00 68.85 285.64 5903.13 6003.63 10178.03 2748.4 -904.10 HS 0.00 6.17 69.52 51688,74 214638.31 15904305 12000.00 68.85 28564 5939.20 6119.70 1970aB 2773.61 -9936.92 HS 0.00 6.17 6952 51689.32 21476w.89 150954.75 Lower Trynek 1269562 68.85 28564 5973.70 6154.20 10359.9 2797.65 40022.80 HS am &18 69.9 51889.88 21469225 158869.56 12900.00 60.05 20564 597528 615578 10363.74 3798.75 -10026.73 HS 000 618 69.52 51689.91 21469346 150865.86 13000.00 was 285.64 6011.36 6191.86 10456.60 293.89 -10116.54 HS am 618 69.52 51690A9 214721.03 15976.56 13100.00 68.85 205.64 604.43 6227.93 10549.46 2849.03 -10206.36 HS am 6.19 899 51691.07 2147748.61 158607,46 13200.00 60.05 28564 063.51 6264.01 10642.31 294.17 -1996.17 HS am 6.19 69.52 61691,66 2147776.18 158598.36 13300.00 80.65 285.64 6119.59 6300.09 1935.17 2899.31 -103&5.% H3 am 620 69.9 51692.24 2147803.75 158509.28 L TvonakB 1339.69 60.05 28564 6142.20 92270 10793.37 291506 -10442.28 HS 0.00 am 69.9 51692.60 214821.04 159453.41 13400.00 60.05 Waal 6155.66 6336,16 1090.03 2924.45 4045.80 HS am 6.20 6952 5169202 214783133 158420.16 13500.00 68.65 285.64 619174 69224 10920.89 2949.59 -10565.61 HS am 620 69.9 51893.40 2147050.90 158331.06 13600.00 WM 285.64 6227.82 6400.32 11013.74 297013 -INO.43 HE am 6.21 699 5169399 214086.4 158241.96 L TwekC 13620.46 was 285.64 93520 841570 11032,75 2979.87 4093.00 HS 0.00 6.21 69.62 51&94.11 2147892.11 15923.73 1370000 6885 285.64 6263.89 6444.39 11106.60 2999.86 -1074524 HS 0,00 6.21 69.9 5169157 2147914.05 15819.9 1380000 0,85 28564 629997 6480.4 11199.6 Maw -10835,05 HS 0.00 6.22 69.9 51695.15 214941.9 1580fi377 13900.00 was 285.64 6M6.05 6516.55 11292.31 3050.14 -10924.9 HS 000 6.22 69.9 51695.73 214969.19 199461 14000.00 6885 28564 6372.12 659.9 11385.17 307528 -11014.60 HE 0.00 623 69.9 51696.31 214996.76 15788557 L ryonek0 1401047 68.85 28664 637590 8558.40 11394.69 397.92 4102408 HS am 623 69.52 5169637 21499985 15787624 14100.00 68.85 28564 640820 6588.70 11478.03 3100.42 -11104.49 HS a0a 623 69.52 $1696.89 214894.34 15779647 14200.00 68.85 285.64 6444.28 69178 11570.89 3125.56 -11194.31 HS a00 623 69.9 5169747 214805191 1979.37 14300.00 6885 285.64 6480.35 6%am 1166374 315010 -11284.12 HS 0.00 6.24 6952 51698.05 214899.48 19618.27 14400.00 60.05 28564 6516.43 669693 11756.60 317584 -11373.93 HS 000 6.24 69.9 5169&63 214819.06 157529.17 14500.00 was 285.64 659.51 6733.01 1184946 3200.90 -1146375 HS 000 6.25 69.9 51699.21 2148134.63 157440.08 LTo k 1459034 was 28564 6595.10 96&60 11933.35 322369 41544.09 HS 000 625 69.9 51899.74 214815954 157359.50 14600.00 was 205.64 6588.59 969.08 11942.32 3226.12 -11553.% HS am 6.25 6952 51699.79 2148162/0 151350.90 1400.00 6885 28.5.64 69466 6805.16 12035.9 3251.26 -11643.37 HS 0.00 825 69.9 51700.37 214810978 15T261.88 14800.00 68.85 265.64 6660.74 684124 1212803 327640 -11733.19 HS 000 6.26 69.9 51700.95 2148217.35 157172.78 14900.00 6&W 28544 669681 8077.31 12220.89 3307,54 -11823.00 HS 0.00 6.26 69.9 51701.53 214944.92 157083,68 15000.00 68.85 28564 932.89 6913.39 12313.75 Maw -11912.81 HE 000 6.27 69.52 5179.11 214972.5D 15699/58 Slerla8ka7COel Mb 1508900 6685 28564 676500 maw 12396.39 3349.06 -11992.75 HS 0.00 827 8952 51702.82 2148297.0.1 15691528 15100.00 was 28564 6768.97 6949.4 12406.60 3351.82 -1209.63 HS 0.00 6.27 69.52 51702.69 2148300.9 15690548 SEanchkaf 15164.95 68.65 28564 6792.40 w72.90 1246&92 338815 -12060.97 HS 0.00 627 09.9 51703.06 214831798 15684.61 Crv&iW 15165.56 68.85 28564 6792.62 693.12 12467.48 3368.30 .12061.51 35.37R 000 6.27 69.9 51703.06 2148318.15 15017.9 190000 69.70 28620 6004.81 6985.31 12499.57 3377.16 -1209.40 3a14R 300 628 70.14 51901.44 2148327.84 156016.35 SlerlOWF 1520..09 6989 28642 W76D 988.10 125913 3379.29 -1209876 35.09R 3.00 &28 70.28 51964.78 2148330.17 158809.13 15300.00 72.15 200.09 6837A0 701198 1259385 MEOB -1219]6 34.SSR 3.00 630 71.95 94404 2148358.21 156726.86 Sln kofE 15301.69 72.20 28&12 883800 701&50 1269&46 340556 -12184.29 34.MR 300 630 71.98 94&126 2148359.75 1592635 Slarichka/D 15383.40 74.23 288.56 6861.60 7042.10 12673.83 343085 -12259.32 34.12R 3.00 6.32 73.48 981341 214838802 15685203 15400.00 74.64 289.85 6868.05 704655 12689.9 343624 -1227337 34.04R 300 an 7319 9996.99 2148391.9 156637.13 9d8' 15481.00 7688 291.25 686814 706680 12788.08 349.19 -1234684 33.7R 3.00 634 7&30 5338655 2148421.38 156561.44 15500.00 77.13 29157 6890.44 7070.94 12786.50 34055 -12384.9 33.62R 300 5.35 75.66 534190 214848.58 15654.40 Shn,4 oWA 1.5&5&25 78.54 292.53 690230 709.80 12841.58 3491.19 -12415.03 33.42R 300 636 76.72 5371&4 214845061 15849701 Slark* /C 155946 78.82 292.72 6904.50 708500 12862.55 349542 -1242516 33.39R 3.00 836 7&93 6379.17 214845511 15648a99 15600.00 79.63 293.26 6910.58 7091.00 12884.49 350]90 -1245460 3328R 3.00 6.37 7755 53094.90 2148468.39 156457,91 Sfan4hkofB 15694.79 82.01 294.64 592570 7106.20 12977.92 354604 -12540.04 33.03R 3.00 639 7937 54244.86 214WMW 15&373.54 15100.00 9.14 29492 6926.42 7106.92 12983.08 3548.21 -1254473 33.02R 390 639 7947 5426261 2148511.13 155368.91 1580000 84.55 296,57 5937.91 7118.41 1309.06 359135 -12534.19 32.83R 300 6.41 8140 5492.17 2148556.70 15628065 1590000 87.19 298.19 594501 7125.51 13181.18 3637.23 -1272275 912R 300 6.43 63.34 5491.16 2148604.96 156193.37 1600000 89.71 299.81 594712 7128.22 13280.16 3685.69 -12810.17 9.67R 300 6.45 Ban 5509]2 2148655.78 15610730 End Cry 15011.45 Mao 30000 6947.75 7128.25 1329148 369141 -12820.11 HS 3.00 645 85.52 559504 2140661.71 156097.9 C. 31100 1602146 90.00 maw 5947,75 7120.25 13301.36 3696.41 -12828.77 79R 000 645 85.9 5502505 214069.00 15508900 16100.00 9231 30031 5945.15 712665 13378.87 3735.85 -12898.66 7.9R 300 6.47 9.60 5514.94 214900.27 15602221 KOPCrv21100 16120.00 92.93 300.39 694523 7125.73 13398.59 374594 -12913.90 LS 3DO 6.47 80.22 55166.82 214918.84 15600525 1900.00 9133 30039 694226 7122.76 134746 3786.39 -1299.85 LS 2.00 648 Bass 5510124 214876114 155937,42 Cry 21100 1970.00 89.93 300.39 694149 7121.99 1354651 39100 -1304323 101.43R 2,00 649 8535 559141 214998.18 15598.9 16300.00 Mal 300.98 694156 712206 13576.09 3037.11 -13069.03 10143R 2.00 5.50 Mar 54988 91 2148814.19 155B9.65 1640000 8941 302.94 6942.23 712213 139425 3890.04 .13153.86 101.4R 2.00 651 84.13 51904.49 2148869.41 155769.28 End Cm 16456.04 89.19 304.4 694.91 7123.41 1372896 3920.% -13200.59 HS 2.00 fi.9 83.9 5485110 214890150 15923.41 16W 09.19 30404 6943.53 712403 13771.78 3945.56 -13237.9 HS am 6.52 83.9 5485114 2148927.17 155687.9 16600.00 89.19 304.04 0944.94 112544 13869.20 4001.53 -13319.08 HS am an 83.9 54851.24 214898538 155806.36 1900.00 69.19 304.04 6946.35 7126.85 13966.61 4057M -1349.73 HE am 6.53 83.9 54851.33 214904358 1559505 Cry 31100 1977.68 09.19 30404 69444 7127.94 1404228 4100.98 -1319.10 9.19L am 6.54 83.62 5405140 2149088M 155461.89 1660000 8960 303.51 694158 7128.18 14064.04 4113.38 -13185.65 9.18L 3.00 6.54 84.16 5499.00 214919)0 155443.69 Cry Y100 169154 90.00 30300 6947.75 712825 14005.09 412520 -13503.66 la- 3.00 6.55 84.58 54956.9 214911400 155426.00 KOP Cry 2/100 16900,00 9235 302.93 6946.14 7126.64 1416183 419.88 -135694 LS 300 6.56 was 55115.93 214910,46 15536138 Cosmopolitan Unit\Cosmoplitan PaMH15-P21H75-P2\H75-P2 (P1) ofilling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:13 PM Page 3 of 4 Cosmopolitan Unit\Cosmoplitan Pad\H75-P2\H75-P2\H15-P2 (P1) Drilling Office 2.8.572.0 .Schlumberger -Private 10110120182:13 PM Page 4of4 MD Incl Rzlm True MOSS N) VSEL NB EW TF OLS Eacluvlan Zmle Ezcleelon Zone GeoMag NOMIIp E(MS) Commenb (ft) (% (ry (10 IRI IM (ft) IRI oulty Zonal 1°I 1'/tOOR) Dimeunybwx men A"?Ih (nTl T) 1RU51 (MS) 17000.00 90.35 302.93 6943.78 712428 14259.63 4222.23 -13653.37 LS 200 6.57 85.04 54986.91 2149215.01 155278.98 Cry 211M 1705.00 0935 302.93 6943.91 712441 14308.55 424942 -1369533 67671- 2.00 6.58 84.08 54899.28 2149243.38 155237]7 End Cry 1700500 09.62 302.29 8944.22 7124.72 14342.83 4260.20 -13724.01 HS 2.00 6.59 84.52 54941.13 2149263.04 155208.82 17100.00 89,62 302.29 6944.32 7124,82 1457.5 427629 -13737.5 HS 0.00 6.59 84.52 54941.14 2149271.39 155196.36 17200.00 8962 302.29 6944.99 7125.49 1445.61 4329.71 -13822.03 H$ 0.00 6.59 84.52 5494122 2169327,09 1511330 17300.00 89.62 30229 6945.65 7126.15 14553.67 4303.12 -13906.57 HS 000 660 84.52 5194129 2149382.78 155030.25 17400.00 89.62 302.29 6946.32 712682 14651.73 4436.5 1399111 HS 0.00 660 84.52 54941.37 2149438.48 154947.19 17500.00 89.62 302.29 6946.90 7127.48 14749.80 4489.95 -14075.64 HS 0,00 fi 61 84.52 5494144 2149494.17 154064.14 17600.00 89.62 302.29 6947.65 7128.15 14847.06 4543.36 4415.18 HS 0.00 661 84.52 5494151 214954987 154701.08 Cry 915 17608.87 • 09.62 302.29 6947,71 7128.21 14056.5 4548.10 -14167.5 1002R 000 fiat 84.52 54941.52 214955461 15477311 Civ 3/100 1762117 90.00 302.35 6947,75 7128.25 14869.21 455500 44170.5 0.21R 300 6.62 5.87 597244 21495200 154763.00 17700.00 92.35 302.36 6948.15 7126.5 14945.89 4596.86 -14244.64 021R 3,00 663 8712 512399 21496055 154690.10 17800.00 95.35 302.37 6939.44 7119.94 15043.69 465.26 44328.91 0.21R 300 665 89.99 5193.80 214966132 154615.32 17900.00 98.35 302.30 6927.52 7108,02 15141M 4703.43 -14412.75 02111 3.00 666 87.13 5124.36 2149716.74 154532.95 10000.00 101.35 302.40 6910.42 7090.92 15237.59 475.20 -14495.94 0.21R $00 668 5.25 54915.91 2149771.76 154451.23 10100.00 104.35 3MA1 6000.19 7068,69 15333.15 4000.44 -14570.25 021R 300 6.69 81.38 5459.16 2149826.22 154370.37 18200.00 107.35 302.42 6060.09 704139 1527,44 4859.99 -14659.45 0.21R 3.00 611 78.5 5085.30 2149879.96 154290.59 1830000 110.35 302.43 6020.59 7009.09 15520.19 491073 -14739.33 0.221R 300 6.72 7563 53466.01 214993266 154212.13 18400.00 11335 302.44 6791.38 6971.5 1511.16 495.51 -1401765 0.2211 300 6,74 7216 5271344 2149984.75 154135.18 EM Cry 10455.03 115.00 302.45 6768.04 6949.34 1580.37 4987.45 -14060.02 HS 3.00 615 71.19 52243.35 215012.83 154093.55 1850.00 115.00 302.65 6749.84 6930.34 1570031 5009.31 -14094.41 HIS 000 615 71.19 5224308 215035.62 15405977 10600.00 115.00 302.45 6707.50 6888.08 15709.14 557.94 -14970.90 HS 000 875 71.19 5224247 215586.31 15395.5 18700.00 115.00 302.45 6665.33 6845.83 1577.97 $106.57 -1547.30 HS 000 616 71.19 52241.86 215137,01 153909.51 1000000 11500 302.45 0623.07 6803.57 1566.80 515520 -15123.86 IS 0.00 616 71.19 5224125 215018770 15MM 37 10900.00 115.00 302.45 6580.01 6761.31 1605.63 520383 -15200.34 HS 000 6.77 71.19 52240.5 215238.39 15375924 19000.00 11500 302.45 6538.55 6719.5 16144.45 5252.46 -1527882 HS 0.00 6.77 71.19 52240.03 215M89M 15365.11 1910000 115.00 302.45 596.29 57619 1623320 5301.09 -1535.30 HS 000 618 71.19 5223941 21533917 153608.96 19200.00 115.00 302.45 554.03 6631.5 16322.11 534972 -15429.78 HIS 000 618 71.18 52238.80 215390.47 15353384 TO 1925037 . 115.00 302.45 532.75 6613.25 , 16366.85 5374.21 -15468.31 0.00 678 71.18 52238.5 215516.5 153496.00 Surney Error Model: ISCWSA Rev 0" 31) 9500096 Confidence 2,7955 agma Suety Program: MD From MD To EDIT Fran Hide Size Caving Mamabr Eao;:: Max Oevcnptlon Pan Indindbn Survey Tod Ty, a Ahola l Suety (R) IRI (R) (In) (In) 4se1 1 0.000 1500.000 1/100.000 17.500 13,375 SLB_MW H5-L011 H04-L01(P 2 5 0.03.048 52 1/100.000 17.50 13,375 SLB M_D .GWG H04-1.01 H04 -101(171)I) 2 5623.048 7055 .0 1/100.000 12.250 9625 SLB_MWD.SMS7D H0 I 3 5483.048 1581.50 1/100.000 12.25 9485 SLB M WlIH04-1.01(171) H04 -Lot l H04-L01(PI l 3 1581,000 16120000 19000.000 8.500 0000 MD -SM SLB_MWD-STD H04-1-0111404-L01(Pl) 4 15/21060 1612050 19000.000 8.55 0.000 SLBMWD-SM H04 -Lot IH04-1-02(PI) 4 16120.000 18900.000 1/100.000 950 0.05 SLB_MWPSTO d 16900.000 105.58 1/100.000 8.55 0.000 SLB MWD+GMAG MO 10311404-L02(Pt) 0047,031 1404-7,03(171) Cosmopolitan Unit\Cosmoplitan Pad\H75-P2\H75-P2\H15-P2 (P1) Drilling Office 2.8.572.0 .Schlumberger -Private 10110120182:13 PM Page 4of4 VNEGI$ on Mane (0.00 k N, 0.00 k E) @ 291.00° vertical Secpon(k) vemcMn (0.00 k N. N, 0.0 0.0 00 k E7 ®29 1.00° vertical Section (ft) Icuw t5p00 luau 12WJ t5wp __....____ . .. _...— Xp'•__._.. --------------- - ---- •-_------- _.. --- _........ __.. ------- ---- ____- 1... _____ vemcMn (0.00 k N. N, 0.0 0.0 00 k E7 ®29 1.00° vertical Section (ft) WEST (k) EAST Schlumberger-Prlvate WEST (k) EAST Icuw t5p00 tgOOP .12pC9 .t ippp __....____ . .. _...— Xp'•__._.. --------------- - ---- •-_------- _.. --- _........ __.. WEST (k) EAST Schlumberger-Prlvate WEST (k) EAST - -tAgN .12pC9 .t ippp __....____ . .. _...— ------- ---- ____- 1... _____ Offset Trajectory Seoarali I All.. I Sep. I Controlling I ReferammTrajector,Risk Level I Alert I Status tiO4-L02(Pi)(Def Plan) H04 -L03 (P1) Anti -Collision Summary Report Analysis Date-24hr Time: September25, 2018-11:13 Analysis Method: 3D Least Distance Client. Blwcrost Reference Trajectory: H04103(Pill (Def Plan) Field: Cosmopolitan Unit Depth Interval: Every 10.00 Measured Depth (a) Structure: Cosmopolitan Pad Rule Set: D&M AntlCollision Standard 5002 v5.1/5.2 Slot: H-04 Min Pts: All local minima Indicated. Well: H04 Version I Patch: 2.10.544.0 Borehole: H04 -L03 Database l Project: localhostlddllhlg-Cook Inlet Scan MD Range: 16900.00%-192501 14239 -95,31 Trajectory Error Modem ISCWSA03-D 95.000% Confidence 2.7955 sigma, for subject well. For 16910.90 7126.25 7124.47 MInPt-O-ADP Offset Trajectories Summary 81.34 Offset Selection Criteria -1.37 42.07 0.98 0SF1.50 Wellhead distance scan: Restricted within 60260.87 ft OSF>100 Minlet4 F Selection fitters: Definitive Surveys - Definitive Plans - Definitive surveys exclude definitive plans 119.01 38.39 -2.85 1.46 - All Noi Surveys when no DefSu my is set in a borehole - All Non -Def Plana when no Def -Plan is set in a borehole 7127.48 Offset Trajectory Seoarali I All.. I Sep. I Controlling I ReferammTrajector,Risk Level I Alert I Status tiO4-L02(Pi)(Def Plan) 26488 2. 885.28 2185.]8 195710 579 OSF1.50 1891000 7126.25 _Fa 0.00 2]]63 -185.52 -2]].63 -D.Ot OSF1.50 16900.00 7128.64 OSF�5D0 OSF<t50 OSF�1.00 Enter Major 0.04 14239 -95,31 -142.34 -0.Oi 0SF1.50 16910.90 7126.25 7124.47 MInPt-O-ADP 81.34 123.41 -1.37 42.07 0.98 0SF1.50 17390.00 712615 OSF>100 Minlet4 F 116.16 119.01 38.39 -2.85 1.46 0SF1.W 17500.00 7127.48 OSF>1.50 Exit Major 338.12 113.71 261.85 224.3 4.4 OSF1.50 18450.00 6951A6 6613.25 Exit Minor 340.02 104.82 269.71 235.20 4.91 OSF1.50 18490.00 691 OSF>5.00 MInPt-O-SF Exit Alen H16PBI(De(Survey) 865.01 115.54 787.56 74848 11.34 OSF150 19250.37 6613.25 TO H04-L01(Pi)(Def Plan) Schlumberge,litivate Warning Algid 189.53 115.541 11207 73.98 2.47 OSF1.50 16900.00 7126.64 O1 Enter Alert 367.37 111.78 292.41 255.58 4.97 O1 17320.09 7126.28 OSF>SAO 1817.17 117.15 1738.84 170D.02 23.51 OSF1.50 19250,37 8613.25 Exit Alert TO Hansen #1A (Dad Survey) 2541.18 743A8 2045.2011 OSF1.50 1]]10.00 7126.21 Waming Alert 2536.94 740.95 20426 1]959 5.1 O1 17730.00 7125.18 MinPts 2446.57 7WAALlEg.5 1]16.54 5.03 OSF1.50 18010.00 7088.93 M,ri 2417.16 72627 193285 1690.88 500 OSF1.50 180w,00 7071.14 0SF<5.00 Min%s 2392.16 726.51 1808.16 1863.fi 4.9 0SF1.5D 18160.00 ]052.91 Enter Alen MlnPts 2203.02 ]22.24 1721.2 1480.] 4.5 0SF1.50 18700.00 680.5.83 2024.18 ]08.28 1551661 1315.90 4.29 OSF1.50 19250.37 6613.25 Minft Mope Hansen pf (Def Survey) 254576 740.96 2051.45 1804.80 5.16 0SF1.50 1812000 7063.63 Pass 2545.36 7Q.731 2051,191 18m.621 5.16 O1 1818000 7047.25 MinPt-O-SF 2545.34 740.71 205120 1804.64 5.16 0SF1.50 1819000 7044.34 violets 2676.94 ]01.56 2208.89 1975.38 573 0SF1.50 19250.37 6613.25 MinPt-CtOt TO Herwen N1AL1 (Def Survey) Pas. 26488 2. 885.28 2185.]8 195710 579 OSF1.50 1891000 7126.25 2641.80 68412 2184.9] 1957.08 519 01 16970.00 7124.62 MinPt-O-SF 2641.71 684.61 2186.96 1957.11 5.79 0SF1.SD 16960.00 7124.47 MInPt-O-ADP 2641.64 684.37 2185.04 195727 5.80 0SF1.50 17970.00 7124.28 MINPT-O-EOU 2835.83 656.41 2399.21 2181.42 6.51 OSF1.W 18380.00 6979.71 MInPt-CtCt 29]3.31 716.8 2685.0 2256.06 6.23 OSF1.50 19250.37 6613.25 Mori Mini H16PBI(De(Survey) P68€ Schlumberge,litivate 3085.8) 254.68 2925.57 2841.01 18.30 O.SF1.50 16930.00 7125.56 3095.67 254.67 2925.58 Min%-CtCI 2841.00 18.30 0SF1.50 16940.00 7125.28 3095.80 254.71 2925.138 284&8 18.3 0SFI.W 16980.00 ]124.4] Min%s 3101.48 254.88 2931.38 2846.8 18.3 0SF1.50 17200.00 7125.49 MIn%-0.SF 3120.10 255.60 2949.3] 2864.50 18.38 0SF1.50 17780.00 7121.70 MinPt-OSF 3134.53 256.52 2883.19 28]8.02 18.3 0SF1.50 18170.00 7050.10 Min%-OSF 3148.39 258.85 2975.16 2890.04 18. 0SF1.50 18410.00 6987.89 Min% -SF 3157.85 258.80 2986.3 2901.05 18.51 0SF1.50 18580.00 6898.53 MlnPt-"F 3158.41 257.38 2986.4 29010 18.47 0SF1.50 18590.00 6892.31 MINPT-O. Olj 3162.10 258.40 2988. 2902.] 18.35 0SF1.50 18870.00 6858.50 MinPt -ADP 3163.64 260.29 2989.78 2903.3 18.24 0SF1.50 18730.00 6833.15 Min% -O -ADP 3169.71 261.8 2884.9] 29080 18.24 0SF1.50 18950.00 8740.18 Min%-0.SF 3189.63 261.]4 2995.01 290809 18.23 0SF1.5() 18980.00 8]35.95 MINPT-O-EOU 31]6.]2 261.52 3002.04 2915.20 16.28 0SFi.5O 19250.37 6613.25 MlnPla TO 416 (Def Survey) 3095.67 254.66 2925.5] 2841.01 18.39 0SF1.50 16930.00 7125.56 Pan 3095.67 254.6] 2925.58 2841.00 18.30 0SF1.50 16940.00 7125.28 Min%-CtCI 3085.80 254.71 2925.86 2841.08 18.30 0SF1.5() 16880.00 7124.47 MinPls 3101.48 254.66 2931.3. 2846.8 18.33 0SF1.5O 17200.00 7125.49 Min%-0SF 3120.10 255.60 2949.3] 2864.5 18. 0SF1.50 17780.00 7121.70 Min%-0.SF 3134.53 256.52 2983.19 2878.0 183 0SF1.50 181]0.00 7050.10 MinPt-OSF 3143.02 258.06 2971.98 2886,9 18.48 0SF1.5O 18350.00 6881.09 Min%-0SF 3155.88 259.4 2982.62 2896.48 18.31 0SF1.50 18580.00 6904.99 Min%-6SF 3179.04 257.55 300].01 2921.4 18.5 0SF1.50 18970.00 6731.73 Minft 318976 258.88 301885 2930.. 18.55 0SFt.5O 19100.00 66]8.]9 Min% -$F 3199.62 259.33 3026.41 2840.29 18.5] 0SF1.50 19250.3] 8613.25 Min%s TO H18A-L01 (P3)(Oel Plan) 3189.09 306.35 2884.54 2882.]5 1506 0SF1.50 16900.00 ]126.64 Pass 3192.32 307.93 2986.70 2884.36 15.60 0SF1.50 16970.00 7124.62 MIOPIs 3207.37 298.90 30718 2908.48 16.1 0SF1.50 17480.00 7127.35 Min% -SF 3451.26 27.98 32]2.2] 3183.27 19.38 0SF1.50 19250.37 6613.25 Min%-6SF TO H16A-L05 (P3) (Def Plan) 3168.09 306.35 2984.54 2882.75 15.66 0SF1.50 16900.00 7126.64 Pass 319232 30],93 2866.70 2884.38 15.60 0SF1.50 16970.00 7124.62 Min%s 3195.49 295.48 2998.17 2900.00 16.2 0SF1.50 17040.00 7124.31 MIn%-0SF 3200.51 298, 3000.5 2901.10 16.08 0SF1.50 Min%-0.SF 320052 299.42 3000.58 2901.1 16.08 0SF1.50 17830.00 17640.00 7128.23 7128.16 MINPT-0.E0U 3200.74 299.69 3000.6 2901.0 16.07 0SF1.60 1]]80.00 7121.70 Min%-OADP 327.94 300.74 307.12 2807.20 1605 0SF1.50 18370.00 6883.55 Min%s 3212.21 301.10 3011.14 2911.10 18.0 0SF1.50 18540.00 6913.44 MInPtOSF 3248.89 301.19 3045.57 2895.50 16.22 0SF1.50 19250.37 8613.25 Min%-OSF TO 416-0-LD](Pal (DBf Plan) 3188.09 306.35 2984.54 2882.]5 15.88 0SF1.50 16900.00 ]126.64 Pass 3192.32 37.93 2986.]0 2684.38 15.60 0SF1.50 18970.00 7124.62 MlnPfa 3195.49 285.48 2898.1] 2900.00 1627 0SF1.50 17040.00 7124.31 Min%-6SF 3200.51 MA 3000. 29()1.10 16.08 MInPt 0 F 3200.52 299.42 3000.5 2801.10 16.08 0SF1.50 0SF1.5O 17630.00 17640.00 7128.23 7128.16 MINPT-6E0U 320014 299.8 3000. 2901-05 16.0 0SF1.50 1]780.00 7121.70 Min% -O -ADP 3207.94 300.74 307.12 290]2 160 0SF1.50 18370.00 8983.55 Min%s 3212.21 301.10 3011.14 2911.1 16.0 0SF1.50 18540.00 6913.44 Min%-0SF 3248.89 301.19 3045.57 2845.50 16.22 0SF1.50 19260.3] 6613.25 Min%-0.SF TO H16A(P3)(Def Plan) 3189.09 306.35r 2984.54 2882.75 15.66 0SF1.50 16900.O0 7126.64 Pass 3192.32 307.93 2986]0 2884.38 15oOf 0SF1.50 16970.00 7124.62 Mins 3195.49 295.48 2998.1] 2900.00 16.27 0SF1.50 17040.00 7124.31 MnPt4]SF 3200.51 298.4 3000.5 2801.10 16.08 0SF1.50 17630.00 7128.23 Mln%-O-SF 3200.52 299.42 3000.56 2901.1 1608 0SF1.50 17640.00 7128.16 MINPT-0.E0U 3200.74 299.6 3000.6 29010 16.0 0SF1.50 17780.00 ]121.70 MIn%-6ADP MInPU Schlumberger -Private 3207.94 300.74 3007.12 290].2 16.05 0SF1.9 18370.00 6983.55 3212.21 301.10 3011.14 2911.10 18.05 OSF1.50 1854'00 6913.44 Mln%-0.SF 3248.69 301.19 3045.57 2945.50 16.22 OSF1.50 19250.37 6613.25 Minlst-O-SF TD H16A-LO3(P3)(Def Plan) Pa. Pass 3169.09 306.35 2964.54 2882]5 1566 051`1.50 16900.00 ]126.64 3192.32 307.93 2986.70 2884.38 1560 OSFi.9 16970.00 7124.62 3195.49 295.48 2998.1] 2900.00 16.27 0SF1.9 1]040.00 7124.31 Min%43SF 3200.51 2994 3000.5 2901.10 16.08 OSF1.50 Min%-O-SF inPt-OOU 3200.52 299.42 3000.58 2901.1 16.08 OSF1.50 1]630.00 1]640.00 7128.23 ]128.18 MIN T-O-ADP 3200.74 299.69 3000.6 2901.0 16.0] 0SF1.9 17780.00 7121.70 Min 320].94 300.74 3007.12 2907.20 1605 OSF1.50 183]090 6983.55 MlnPts 323651 304.81 3027.07 2925.80 15.94 OSF1.50 19250.37 fi613.25 Min%-0.SF Min%-0.SF H16A-LOO (P3)(Def Plan) _ Pass 3169.09 306.35r-2W-4-5-4r-28-82-751 1566 051`1.50 16900.00 7126.64 319232 307.93 2986.]0 2884.38 15.60 OSF1.50 16970.00 7124.62 MinPis 3195.49 295.48 2998.17 2900.00 16.2 OSF1.50 17040.00 7124.31 Min%-O-SF 3200.51 299.42 3000.5 2901.10 18.08 OSF1.50 Min%-O-SF 3200.52 299.42 3000, 2901.1 1608 OSF1.50 17630.00 1]640.00 7128.23 7128.16 MINPT-0.EOU 3200.74 299. 3000.8 2901.0 16.01 OSF1.50 17760.00 ]121]0 Min%-O-ADP 0-ADP 32 TN 300.74 300].12 290]20 16.05 OSF1.9 18370.00 8983.55 3212.21 301.10 3011.10 2911.10 1605 051`150 18500.00 891304 MinPMun% 3246.69 301.19 3045.5] 2945.50 16.22 OSF1.50 19250.37 6613.25 Min%-0-SF TD H16A-L04 (P3) (Def Plan) 3189.09 308.35 2984.54 2882.]5 15.66 OSFt50 16900.00 712604 Pass 3192.32 307.93 2988]0 2884.38 15.60 OSF1.9 16970.00 7124 MlnPts 3195.49 295.48 2998.17 2900.00 16.27 OSF1.50 17040.00 .62 7120.31 Min%-O-SF 3200.51 299.4 3000.58 2901.10 16.08 OSF1.50 Min%-O-SP 3200.52 299.42 $00058 2901.10 1808 OSF1.9 17630.00 17800.00 7128.23 ]128.18 MINPT-0.EOO MO.74 320794 299.69 39.74 3000.6 39].12 29105 16.0] 0SFi.9 17780.00 7121.70 Min%-O-ADP Min%s 321221 301.10 3011.14 29].20 16.0 2911.10 16.0 0SF1.50 031`1.50 183]0.00 18500.00 6983.55 6913.44 Min%-0-SF 3246.69 301.19 3045.57 294550 16.22 OSF1.50 19250.37 6613.25 Min%-0SF TD H16A-L02(P3)(Def Plan) 3189.09 306.35r-78-4.54 2682.]5 15.66 OSFL50 1690.00 ]12654 Pass 319232 307.93 2986.70 2884,381 15.01 OSF1.50 16970 ]124.62 MinPls.00 3195.49 295.48 2996.17 2900.00 16.2 OSF1.50 1]040.9 7124.31 Min%-O-SF 329.51 299.4 3000.58 2901,10 16.08 0SF1.50 17830.00 7128.23 MInP140.SF JnPl-0OU 3200.52 299.42 309.58 291.1 16.08 OSF1.50 17800.00 7128.16 MIN 3212.78 303.92 3009.84 298.8fi 15.9 OSF1.50 1899.9 6]23.28 MinPt-O-ADP 3225.55 300.25 3025.05 2925.30 16.16 OSF1.50 19250.37 8613.25 Min%-0.SF ,SF H12-L01(Def Survey) 4054.07 271.55pr-3172.7111 378252 22.47 OSF1,50 17010.00 7124 Pass.23 4054.0 271.53 36]2.71 3782.53 22.47 051`1.50 17030.00 7124.25 Min%s 4057.16 271.74 38]5.67 3785.4 22.4] 0SF1.9 1]290.9 Min%-CiCt 4061.83 271.82 3880.29 3]9.01 22.49 OSF1.50 17600.9 7126.09 7128.15 Min%-O-SF 4089.04 271.43 3887.]5 3797.60 22.5 OSF1.50 17860.00 7113.41 Min%-0.SF 4031.4] 275.98 384].15 3755.4 21.98 O.SF1.50 18580.00 69499 Min%-0SF 4027.14 319.23 3813.99 3707.91 18.98 OSF1.50 16870.9 6858.50 Min%-0SF 4024.52 318.38 3811.90 3]06.14 19.02 OSF1.50 18]9.9 6807.79 Min%-O-SF 4024.46 318.30 3811.9 3]06.16 1902 OSF1.50 1889.00 6803.57 MMinPt--AOP 4024.42 318.13 3812.00 370629 19.03 0SF1.50 18820.00 6]9.12 MINPT40.E0U 404].56 MOO 3838.53 3734.50 19.45 0SF1.50 19250.37 6613.25 Min%-CtCt TD H12-1-02 (Def Survey) 005407 27155= 3]82.52 22.47 051`1.50 17010.00 712423 PON 4050,116 271.53 3872.71 3782.53 22.47 OSF150 1]03000 ]124 MinPls 4057.16 27114 3876.6] 3785.4 224 OSF1.509.00 1]2 .25 7126.09 MInPan% 4055.80 274.14 38]2.72 3781.6 222 OSF1.9 17650.00 7128.04 Min%4}SF Min%-0SF .Schlumberger-PrWate 4050.02 2]3.08 386]. 3]78. 22.32 OSF1.50 1]930.00 7103.43 405000 273.07= 3]]6.94 22.32 OSFI.W 1]840.00 71D1.80 Min%-0-FDP 4049.99 273.02 3887.65 3776.97 2233 OSFI.W 1]980.00 7088.38 MINPT-0-EOU EOE 4050.26 2]3.90 386].33 3]76.38 22.2 OSF1.50 18040.00 7082.64 Mine ctct 4048.06 273.58 3866.34 3]]5.4 22.28 OSF1.50 18180.00 7052.91 WR-O-SF 004903 2]3.55 3889.3 37]5.48 22.28 OSFI.W 181]0.00 7050.10 Min%-O-ADP 409901 2]3.50 3886.35 3]]5.52 2228 OSF1.50 1819.9 ]044.34 MINPT-0-EOU EOE 4050]3 273.9 3867.]5 3778.7 22.2 OSFI.SD 18380.00 69]9.71 Min cict 4055.30 273.87 38]239 3781.43 22.2 OSFi.9 18640.0D 6871.18 MinPis 4048.12 2]899 3861,801 3769.131 2I.Ml OSF1.50 19250.37 6613.25 Min%-O43F Min%s H12+1,03 (DMSurvey) 4054.0] 271.5 38]2]1 3782.52 22.491O5F1.50 17010.00 ]124.23 Pass 4054.0 271.53 38]2.71 3782.53 2247 OSF1.50 1703000 7124.25 MinP1e 4057.16 271.74 3876W 3]8542 22.4 OSF1.50 1]290.00 MinPPCTCt 4055.60 274.14 38]2]2 3781.6fi 222] OSF1.50 17650.9 ]12608 7128.04 Min%-OSF 4050.02 2]3.09 388].6 3]]6.93 22.32 OSF1.50 1]930.00 7103.43 MMPI-O-SF 4050.00 2]3.0 3881.83 3]7694 22.32 OSF1.50 17940.00 ]101.80 Min%-O-ADP 4049. 273.02 3887.65 3776.97 22.33 OSF1.W 17960.00 ]098.38 MINPT-O-EDD 4050.28 273.88 386].34 3]]6.3] 22.2 OSF1.50 IW40.00 ]082.84 Min%-EOU 4049.44 2]3.52 388cla 8]6 3775.9 22.28 OSF1.50 18120.00 ]083.83 Mln%O$F 9049.41 2]34] 38W7 3]]5.93 22.29 OSF1.W 18130.00 ]061.03 Min%-O-ADP 4049.39 273.38 3866.81 3776.01 22.29 OSF1.50 18150.00 ]055.6] MINPT-O-EOU 40W.75 275.00 3887.08 3]]5,]5 22.1 OSF1.50 18410.00 6967.89 MInPI-0101 4049.]7 274.81 3866.3] 3]]5.18 2220 OSF1.50 18490.00 8934.57 Min%-OSF 4049.73 274.58 38118.3] 3]]5.18 22.20 OSF1.M 18500.9 6930.34 Min%-O-ADP 4048.] 274.45 3866.41 3]]5.25 22.21 OSF1.50 1852000 6921.89 MINPT-OADP 406239 2]5.28 3868.58 3777.13 22.1 OSFI.60 18710.00 6841.9 Min%-EOU m-0tct 0052.20 275.17 3888.43 3]]7.0 22.16 OSF1.W 18750.OD 6824.70 Min 4052.18 275.1 3866.4 3]]7,03 22.16 OSF1.50 1876D.9 6820.47 Min%-O-ADP 4052.1 2]5.13 3868.43 3]7].05 22.1] OSF1.50 18]70.00 8816.24 MINPT-0in%{OU 4056.00 2]7.0.5 38]09] 3778.95 22.03 OSF1.50 19080.00 6685.24 -EOU MRCt 4053.0 276.71 36811.2 37]6. 22.04 OSF1.50 19250.37 6613.25 Min - SF Min%e H12-LO4 (Def Survey) 4054.07 271.55 3872.71 3782.52 22.6] OSF150 17010.00 7124 Pass 4054.06 271M 271.53 38]2.]1 3782.53 2247 OSF1.50 17030.00 7124,25 MIOPts 4057.16 2]1]4 3875.67 3]854 224 OSF1.50 1]280.00 ]128.09 MinP,nC Ect 4055.80 274.14 3872)2 378166 2227 OSF1.W 17850.00 7128.04 Min%-OSF 4050,02 273.09 388].64 3]]6.9 22.32 OSF1.50 1]930.00 7103.43 Min%-OSF 40W.00 2]3.0 386].63 3]]6.84 22.32 DSF1.5D 1]940.00 7101.80 MMMPI-ADP 40/9.9 273.02 386].&5 3776.97 22.33 OSFIM 17860.00 7098.36 MINPT-0.EOU 4050.26 2]3.88 388].34 37]8.3) 22.26 OSF1.9 18040.00 ]082.84 MinO.EOU 4099.44 2]3.52 3868.78 3]]5.62 22.28 OSF1.50 18120.00 ]063.83 Min%-OSF 4049.41 2]3.4 3888.]8 37]5.93 22.28 OSF1.50 18130.00 ]061.03 Min%-O-ADP 4049.39 273.38 3888.81 3]]6.01 22.29 OSF1.W 18150.00 7055.6) MINPT-O-EDD 409.75 275.00 3887.08 3]75.]5 22.1 OSF1.50 18410.00 6987.89 Min%-EOU 4049]7 2]4.61 3888.3] 3775.16 22.20 OSF1.50 18480.00 8934.57 MinPI-O-SF 4049.73 274.9 3888.37 3]]5.18 22.20 OSF1.W 18500.00 6930.34 Min%-0-ADP 4048.] 2]4.45 3868.41 3]]5.25 22.21 OSF1.W 18520,00 6921.89 MINPT PT-O-E E U OU 4052.39 275.26 3868.M__3777..13 13 22.18 OSF1,50 18710.00 6841.9 n 4052.20 2]5.1] 3868.43 3]7]0 22.16 OSF1.50 18]9.00 8824.70 Min%OSF 4052.18 275.15=1 377]03 22.16 OSFI.W 1879.00 6820.47 MMsPt ADP 40521 275.13 38138.43 37]7.05 22.17 OSFI.W 18]]0.00 6816.24 MIinPt -AOU EOE 4063.66 274R7 3800.22 3788, 222 OSF1.50 18220.9 862S.M Min 406475 2]462 3881.34 3790.12 22.28 OSF1.50 19250.37 M13.25 Min%-0SF TO H12 (Oet Survey) 40540] 271 38]2.71 3]82.52 22A7 OSF1.50 17010.9 7124.23 Paso 4054.0 271.53 38]2.]1 378253 22.4] OSF1.5D 17030.00 7124.25 mim% Min%s 4057.16 2]1.]4 38]5.67 3785.42 22.4 OSFI.W 17290.W 7126.09 Min 4055.80 274.14 38]2.72 3781,6] 22.2 OSF1.50 176W.00 7128.04 MiinM-CtCtF 4050.02 273.09 386]. 3]78. 22.32 OSF1.50 1]930.00 7103.43 MInPI-0.SF MMhPt-ADP Rhlumberger-Private 4050.00 273.0 M67M 3776.94 22.32 OSF1.50 17940.00 7101.80 4049. 273.02 386LM 3776.97 2233 OSFI.M 17960.OD 7098.38 MINn O-EOU 4050.28 2]3.88 388].34 3776.38 22.26 OSF1.60 IW40.M 792.64 MIaP1-CICS 4049.44 273.52 3866.76 3]]5.92 22.28 OSF1.50 18120.00 7063.63 MmRP SF 4049.41 273.4 3868.7 37]5.93 2229 OSF1.W 18130.00 7061.03 MmRP ADP 4049.39 273.38 3866.81 3]]6.01 22.29 OSFI.W 18150.00 7055.67 MINPT-O-EOU 4050.75 275.00 38137.09 3]]5.75 22.17 OSF1.W 18410.00 6967.89 MinRt Ct 4049.77 274.61 3886.37 3]]5,17 22.20 OSF1.50 18490.00 6934.57 MinR-OSF 4049.73 274.55 3888.37 3775.18 22.20 OSF1.50 18500.006930.M MIaP-O-ADP 4049.] 274.45 3866.41 3775.28 22.21 OSF1.50 18520.00 6921.89 MINPT-0-EOU 4052.39 275.26 3868.56 3777.13 22.16 OSF1.50 18710.00 6841.60 MMpt43tCl 4052.20 275.17 3868.4311 3777.0 22.16 OSF1.W 18750.00 6624.70 MinPt-OSF 405218 275.1 3668.4 3]77,04 22.16 OSFI.W 18760.00 6820.47 MinPt-OADP 4052.18 275.12 3888,43 3]7].05 22.17 OSF1.50 18770.00 6816.24 MINPT-O-EOU 406366 27467 3880.22 3788. 22.2 OSF1.50 19220.00 682608 MinPl-CtCt 4064.75 274.62 3881.34 3790.13 22.28 OSF1.50 19250.37 6613.25 Mi RP la TO H12 -L05 (Def Survey) - 4054.0] 271.5 38]2.]1 3]82.52 22.4] OSF1.50 17010.00 7124.23 `7784¢, 4054.0 271.52 3872.72 3782.54 2247 OSF1.50 1]030.00 7124.25 MinMa 4057.16 27173 3875.68 3]85.43 22.4 OSF1.50 17290.00 MhR% Ct 7126.09 MInR-O-SF 4055.80 274.13 3872)2 3781.67 22.2] OSF1.50 17650.00 7128.04 40.50.02 273.08 3867.84 37]89 2232 OSFI.SD 17930.00 7103.43 MMRF 4050.00 27398 386]64 3776.94 22.32 OSF1.W 17940.00 7101.80 MinPt-OADP 4049. 273.01 3867.65 3776.96 22.33 OSF1.50 17960.97 7098.38 MINPT-O-EOU 4097.26 273.88 386].34 3776.38 22.2 OSF1.50 1940.9 7082.64 MinM.CI 4049.44 2]3.51 3866.]]3775. 2228 OSF1.50 18120.00 7063.83 MmPt-O-SF 4049.41 273.47=1 377594 22,29 OSFI.50 18130.00 7061.03 MMPIOADP 4049.39 273.37 3866.61 3]]6.02 22.29 OSF1.W 18150.00 7055.67 MINPTOEOU 4050.75 275.00 3887.09 3]]5.75 22.1] OSFt.9 18410.00 8987.89 MinR.CtM 4049.]] 274.60 3886.38 3]]5.1] 22.20 OSF1.W 1849000 6934.57 MMM-OSF 4049.73 274.55 3886.3] 3775.18 22.20 OSF1.50 18500.00 6930.34 MinPI-O-ADP 4049,] 274.44 3886.41 3775.26 22.21 OSF1.50 18520.00 8921.89 MINPT-O-EOU 4052.39 275.26 3868.56 3777.14r 22.16 OSF1.50 18710.00 M41.W MmRP Ct 4052.20 275.17 3868.43 37770 22.18 OSF1.50 18750.00 6824.70 MInR-"F 4052.18 275.1 3868.43 3777.04 22.17 OSF1.W 18760.OD 6620.47 MinR-OADP 4052.18 275.12 3888.44 3777.06 22.17 OSF1.50 18770.0 6816.24 MINPTOEOU 406366 274.66 3880.22 3788.99 22.2 OSF1.50 19220.00 6826.08 MinM-C[Ct 406475 274.62 3881.34 3790.13 2228 OSFL50 192W.37 6813,25 MInPt-O.SF TD H12 -LOB (OatSurvey) Pass 405407 271. 3812.]1F 3782.52 22.4] OSF1.50 17016.09 7124.23 4054.06 27153 38]2.]1 3782.53 22.47 OSF1.50 17030.0 7124.25 Mtn%s 4057.16 271.74 3875.67 3]85.42 22.47 OSF1.50 17290,00 7126.9 Min%-CICt 4055.80 274.14 3872.72___1781.67 22.2 OSF1.50 1769.00 7128.04 MmR-O-SF 4050.02 273.09 3867.64 37]8.94F 22.32 OSF1.50 17930.00 7103.43 MInP1OSF 4050.OD 273.07 388].83 3776.94 22.32 OSF1.W 17940.00 7101.80 MmRes OADP 4048. 273.02 3867.65 3776.97 2233 OSF1.W 17960.OD 7098.38 MINPTOEOU 4050.28 273.88 366134 3]]6.38 22.2fi OSF1.50 18040.W 7082.64 MIOPI-CICt 4049.44 273.52 3866.76 3776 92JF 22.28 OSF1.50 1812D.M 7063.63 MinKI SF 4049.41 273.4 3666.7 377593 2229 OSF1.50 18130.00 7061.03 MlnlstOADP 4049.39 273.38 3866.81 3776.01 22.29 OSIat50 1819.00 7055.67 MINPT-O-EOU 4050.75 275.9 386].09 3775.75 22.1 OSF1.50 18410.00 6967.89 MlnR,-tC1 4048.77 274.61 3888.37 3]]5.17 22.20 OSF1.W 18490.00 6934.57 MI R Ot F 404973 274.ssr WN.371 3]]5.18 22.20 OSF1.W 18WO.00 6930.34 MmR-O-ADP 4049,] 274.45 3886.41 3]]5.28 22.21 OSF1.50 1M20.W 6921.89 MINPT.O-EOU 4052.39 275.26 3888.56 3777.13r 22.16 OSF1.50 18710.0 6841.97 MIOPI -M 4052.20 275.17 3888.433]710 22.16 OSF1.50 18750.00 M24.70 MiaPt-O-SF 4052.18 275.1 3888.43 3]7704 22.16 OSF1.50 1879.00 920.47 MinP1OADP 492.1 275.12 3868.43 3]7].05 2217 OSF1.W 18770.00 6816.24 MINPT EOU 4083.9 274,67 388022 3788.9 22.2] OSF1.W 19220.00 6626.08 MinM-CtCI 4064.75 27462 3881.34 3790.13 22.28 OSF1.50 19250.37 M13.25 MinP1-OSF TO Survey) Peas RhlumWq,Prwate Sshlumberger-Private 4333.83 1W.511 4208.441 4143.32 34.32 OSF1.50 t69o.00 7126.64 5100.07 14]87 5001,11 4952.20 5212 OSF1.50 19250.37 6613.25 Min%s TO H14PB2(Del survey) Pass 45]3.55 253. 4409 4319.6 2] 13 OSF1.50 16900.00 7126.64 45]3.28 257.09 4401.53 4316.19 26.]9 OSF1.50 17340.00 7128.42 MlnPis 4561.86 258.06 4389.48 4303.80 28.6 OSF1.50 17860.00 7113.41 VmPI-O-SF 4559.94 257.89 4387.88 430206 28.63 OSF1.50 18090.00 7071.14 Min%-O-SF 4559.96 257.88438181 430198 26.62 OSF1.50 18130.00 7081.03 Min%-0IDt 409.97 257.1 438].82 4301.99 28.62 OSF1.W 18140.00 7058.37 MinPts 4570.16 259.16 4397.02 4310.89 28.5 OSF1.50 18650.00 6866.95 Min%-O-SF 4593.12 259.7] 4419.58 4333.35 2663 OSF1.50 19130.00 6684.12 Mln%-O-SF 4598.76 290.85 6404.83 43p8n 23.62 OSF1,W 19250.37 661325 MmPtOADP MinPts H14PB1(Def Survey) Pass 46946 253.8 4525.10 4440.80 27.84 OSF1.50 16900.00 7126.60 4695.07 253.91 4525.47 4441.16 27. OSF1.50 1694000 7125.28 MinPis 4899]] 255.1] 4529.33 444460 27.73 OSF1.50 17180.00 ]125.35 MIUPI-O-SF 4899.89 255.30 452938 4444.5 21.12 OSF1.W 17190.00 7125.42 MINPT-0-EOU 4700.51 258.1 4529.4 4444.3 21. OSF1.50 17320.W 7126.28 Min%-O-ADP F=-- 256.12 4529.44 4444.39 27.63 OSF1.50 17330.00 7126.35 Min%s 4693.19 281.83 0.518.30 4431.36 26.98 OSF1.W 18080.00 6947.24 Min%-act 4538.11 261.22 4513.64 4428.90 21.02 OSF1.W 18700.W 6845.83 Min%-OSF 6898.0 261.19 4513.64 4426.90 27.02 OSF1.0 18710.00 8841.60 Min%-O-ADP 4685.00 261.16 4513.64 4426.92 27.02 OSF1.50 187W.00 683].3] MINPT-C-EOU 47W.54 28161 4525.80 "W.93= OSF1.50 19220.00 02668 Mi.pt- Ct 470162 261.65 4526.86 4439.97 27.05 OSF1.50 192W.37 6613.25 Min%OSF TD H14PB3(Def Survey) - Pass 4]51.32 252874682 411 4498.44 OSF1.50 16900.00 7126.64 4763.88 255AII 4593.2 4508.51 28.11 OSF1.50 1722000 7125.62 MinPls 4]6485 255.23 4594.37 450.62 28.11 OSF1.50 17310.00 ]126.22 MinPte 4789.15 255] 4598.3 4513.3 28.0] OSF1.W 1700.00 7127.48 Min%-OSF 4769.63 2562 45984 4513.3 28.02 OSF1.0 17550.W 7127.82 Mine 4769.88 2W.30 4598.48 4513.38SF 28.02 OSF1.50 175W.W 7127.86 Min%s ns 4]]2.49 258.80 4599.83 4513.89 2].] OSF1.50 18010.00 ]088.93 Min% 4770.88 258.58 4598.18 4512.32 27.78 OSF1.50 161W.00 7052.91 Min%O8F 4170.88 258.54 4596.17 4512,32 27.78 OSF1.W 18170.00 7050.10 Min%-0-ADP 4]]0.85 20.52 408.18 4512.33 27.78 OSF1.50 18180.0 7047.25 MINPT-O{OU 4771.0 258.63 4598.81 4512.9 27. OSF1.W 16320.0 7002.03 MInPt-CICt 4780.49 260.01 0806.83 4520.48 27.68 OSF1.W 18700.00 6845.53 Min%-OSF 4536.45 259.42 4633.17 454].02 27.89 OSF1.50 19250.37 8813.25 Min%-04F TO H14(Del Survey) Pass 4654.13 252.26 466562 46018] 2897 OSF150 1690000 ]126.&1 4859.38 255.4] 4688.]4 46-91 28.64 OSF1.50 16960.00 7124.47 MinPts 4580.52 258.30 4689.3 400.2 28.55 OSF1.W 17060.00 7124.51 MinPls 4861.W 256.76 468957 4W4 3:111 28.50 OSF1.W 17110.W 7124.89 Min%-0-ADP 4871.55 256.72 4700.01 4614.83 28.5 OSF1.50 1149.9 7127.42 Min%-O-SF 4881.48 257.08 4]09.76 482440 28.59 OSF1.50 1"W.9 7121.70 Min%s 4882 .96 257.87 4710.72 4625.09 2851 OSF1.50 17640.00 7115.W Minft 4886.9] 258.]3 4714.1 46282 28.4 OSF1.W 17990.00 7092.86 Min%-ft t-O-SF 4890.05 260.26 4716.22 4629.] 28.2 OSF1.W 18170.0 700.10 Min% 4889.92 20.20 4718.1 4829.1 28.29 OSF1.0 18200.00 7041.39 Min SF 4889.W 2w.ioFF4716.12 4829.73 26.29 OSF1.50 18210.9 7038.38 Min%-O-ADP 4889.8 260.16 4]16.13 4629.]4 28.30 OSF1.50 18220.00 7035.32 MINPT-O-EOU 4891.92 280.54]17.88 463136 282fi OSF1.50 18610.00 6967.89 Min%CiCI 4892.62 261.69 4]1]83 4630.92 26.14 OSF1.0 18530.00 6917.66 MInP6 4892.0 261.88 471].] 4830.88 28.15 OSF1.50 18560.00 6904.99 Min%-OSF 4892.0 261.67 471]78 0830.89 28.15 OSF1.50 185]0.00 690.76 Min%s 4894.71 283.4 4]1078 4631.3 27.97 OSF1.50 189W.W 6735.95 Min%-CtCt 4894.83 283.43 4]18.88 483140 27.9] OSF1.50 19010.00 6714.82 MinPis 4898.71 263.27 4722.87 4635.40 28.01 OSF1.W 19250.37 6613.25 Min%-OSF TO Sshlumberger-Private Survey) H14PB2(Det Survey) H 14PB3(Df Surrey) 5134.23 204.00 49%.511 4930231 3869 OSF1.50 19250.3] W13.25 0.0 198.0 32.81 MAI 165. NIA MAS =10.00 (m) 30.00W.00 MinPts 4876.67 253.62 4707.27 4623.0 28.95 OSF1.0 17190.00 8824.90 35.25 4883.32 252.76 4714.49 4630.56 2909 OSF1.50 17452.56 6713.25 Min% -O -SF 120.00 120.00 WRP 182.81 32.81 187.20 159.80 TD 198W 3281 196.81 16529 NIA MAS =10.00 (m) 0.00 0.00 180.03 198.09 3261 196.81 185. NIA MAS=1000 (m) 30.00 30.00 Surtace 198.09 32.81 196.81 165.29 152204.12 MAS = 10.00 (m) 35.25 35.25 Min%s 198.32 32.81 196. 185.51 529.79 MAS=10.W (m) 120.00 120.00 WRP 192.81 32.81 187.20 159,801 48.37 MAS =10.0 (m) 950.08 84].99 MINPI-0-EOU 192.84 32-811 186,981 160.03 41.91 MAS=10.0 (m) 1020.00 1016.79 MmRs 213.82 32.81 203.62 181.02 23. MAS =10.00(m) 1500.00 1473.74 MINPT-O-EOU 347.]5 32.81 330.80 314.9 22.1 MAS =10.00(m) 2390.00 2201.56 MinPt-0SF 352.41 32.81 335.26 319.60 22.12 MAS=10.00(.) 2410.W 2215.45 Min%-OSF 871.06 57.21 832.49 813.85 23. OSF1.50 40]000 2978.63 Min%-OSF 1225.1] 73.39 11]5.8] 1151.7 25.41 OSF1.50 5120.00 3388.99 MhPl-0.SF 1887.24 119.33 1807.31 176T.91 23. OSF1.0 ]050.00 408852 Min% -SF 2642.44 124.49 2559.06 2517. 32.12 OSF1.50 9310.W 4926.72 Min%-OSF 2]20.48 128.07 2834.]2 2592.41 32.13 OSF1.50 mom 5012.23 Min% -O -SF 2845.58 134.93 2755.25 MOM 31.8 OSF1.50 9910.00 5149.]9 Min% -O -SF 29]9.17 142.16 2884.01 2837.00 31.6 OSF1.W 10310.00 5298.50 Min%ASF 3125.56 149.53 3025.49 29]8.0 31.58 OSF1.W 10740.W 5458.36 Min%-DSF 35]2.94 1]6.19 3455.10 3396.74 30.60 OSF1.50 12080.00 5949.10 Min%-0.SF 3652.30 180.23 3531.]] 34]20] 30.5 OSF1.50 12308.00 6038.33 Min% -O -SF 3915.85 194.24 3785.98 3721.61 30.41 OSF1.50 13000.00 6320.87 MinPt SF 4258.11 216.30 4113.53 4041.81 29.68 OSF1.50 14070.0 6698.3] Min%-OSF 44]4.02 228.88 4321.20 4245.35 2949 OSF1.50 14710.00 8934.30 Min%OSF 450.30 233.45 4413.29 4335.8 29.50 OSF1.50 15000.00 7033.03 Min%-O.SF 4802.70 256, 4431. 434!1.2 27.02 OSF1.0 16300.00 ]113.36 Min%ASF 4588.82 251.82 4420.5 433].00 27.45 OSF1.W 16830.00 6976.58 MInPW 458878 251.] 4420.5 433].01 27.45 OSF1.50 16840.00 697256 mmm% AOP 4588.] 251.67 4420.61 433708 2146 OSF1.50 16870.00 6960.&5 MINPT-O-EOU 4597.22 253.12 4428.11 4344.10 27.35 OSF1.0 17220.00 6812.14 Min%CtM 4594.39 253.46 4425054340.92 2130 OSF1.50 1]430.00 6722.84 Min% -O -SF 4594.11 25341 4424.61 4340]0 2].30 OSPo.50 17452.56 6713.25 MinPt-O-SF MinPts INN 32.81 196.81 165.29 NIA MAS =1090 (m) 0.00 0.0 198.0 32.81 MAI 165. NIA MAS =10.00 (m) 30.00W.00 30 Surtace uff ace 198.09 32.81 198.81 185.29 152204.12 MAS =10.00 (m) 35.25 35.25 ft 198.32 32.81 198.6 165.51 529.79 MAS =10.0(m) 120.00 120.00 WRP 182.81 32.81 187.20 159.80 48.37 MAS =I0.W Im) 950.00 947.99 MINPT-O-EOU 192.84 32.811 186.98 180.03 4191 MAS =10.00(m) 1020.00 1016.79 Min%s 213.82 32.81 203.62 1810 23.84 MAS =10,00(m) 1500.00 14]3.74 MINPT EOU 34].]5 32.81 330.80 314.94 22.12 MAS=1000(.) 2390.00 2201.56 Min%-OSF 352.41 32.81 335.25 319.60 22.12 MAS=ID.W(m) 241000 2215.45 Min% -O -SF 871.06 67.21 832.49 813. 23.3 OSF1.50 4070.00 29]8.83 MmPt- -SF 1225.1] 73.39 1175.87 1151.7 2541 OSF1.50 5120.00 3388.99 Min%-0SF 188].24 119.33 180].31 1767,91 23.90 OSF1.50 7050.W 4086.52 Min% -0-$F 2842.44 124A9 2559.06 2517.94 32.12 OSF1.50 9310.08 4926.]2 Min%-0.SF 2]20.48 128.07 2634]2 2592.40 32.13 OSF1.50 9540.00 5012.23 Min%A-SF 2845.58 134.94 2755.25 2]1065 31.8 OSF1.50 9910.00 5149.79 Min%ASF 2979.17 142.16 2884.01 283].0 31.6 OSF1.W 10310.W 6298.50 Min%ASF 3125.56 149.53 3025.49 2976.0 31.5 OSF1.50 10740.0 5058.36 Min%-OSF 3572.94 176.20 3455.09 3396.7 0. OSF1.50 12060.00 5949.10 Min%-0.SF 3652.30 180.24 3531.]] 3472.0 30.5 OSF1.50 1230.00 6038.33 Min%A-SF 3915.85 190.24 3785.98 3721.61 30.41 OSF1.50 1300.08 6320.87 Min%-0.SF 0258.11 216.30 4113.53 4041.81 29.68 OSF1.50 10070.W 6696.3] Min%-0.SF 4474.02 228.68 0321.19 4245. 29 OSF1.50 14710.00 6934.30 Min%ASF 4589.30 233.45 4413.29 4335.8 29.4 OSF1.W 1500.00 7033.03 Min%-0SF 0898.46 247.18 4533.31 4451.2 28.63 OSF1.0 15550.08 7125.57 Min% -O -SF Min%s 54hlumberger-Private Pass Pess P.S. 1118M1.07 (P3) (Def Plan) H16 (Def Sun ) 4724.39 247.39 0.559.13 44)]00 26.]5 OSF150 15180.00 1128.25 4129.62 248.45 4583.65 4481.1 28.66 OSF1.W 1583000 7128.25 Min%-OSF 4745,88 251. 45]].5 4493.8 2836 OSF1.50 18000.00 1128.25 Min% -O -SF 4155.04 253.17 4585.93 4501.8] 28.2 OSF1.50 16300.00 7113.36 Min%s 4781.93 252.18 450.48 4509] 28.4 OSFi.W 16470.00 7084.85 Min%-0SF 4761.34 251.87 4593.0 4509.4 2846 OSF1.50 16510.00 1081.23 MMRF 4161.31 251.8 4593.0 4509.47 28.46 OSF1.50 1658000 7058.59 Min% -0 -ADP 4]81.2 251.10 4593.13 4509.55 28.48 OSF1.50 16620.00 7047.53 MINPT-0-E01.1 478138 251,7 4613.23 452 6 28.6 OS%.50 1]320.00 6169.62 Min%-qD1 4784.69 251.55 461659 4533.04 28.63 OSF1.60 17452.66 6713 MinPts % .25 TD 238.13 32.81 2313.84 205.32 WA MAS =10.00 (m) 0.00 0 Pass00 238.13 32.81 238.84 205.32 144748.38 MAS=10.00 (m) 35.25 35.25 SuAece 23].31 32.81 234.95 204.50 219.92 MAS =1000 (m) 220.00 220.00 WRP 231.35 32.81 234.88 204.54 199.89 MAS=t0.N lm) 240.00 24000 MWRP 285.11 32.81 258.90 232.31 0.54 MAS =10.00 (m) 980.00 951.80 MINPT-M,n% 265.14 32.81 258.88 232.34 52.99 MAS =10.00 (m) 910.00 98].89 MiEOU nPts 30/.50 3281 294.10 2716 3326 MAS=10.00 (m) 1500.00 14]3.]4 MINPT-0-EOU 763.26 81.95 121.59 ]01.32 18.80 OSF1,50 43W.N 3011.51 Minlst-6SF 827.83 66.69 ]82.99 ]61.14 189 OSF1.50 4650.00 3194.26 Min% -O -SF 1358.11 122.0 12]6.89 12362 16J OSF1.W ]NO.W 4088.52 Min% -SF 1498.91 102.59 1428.21 1394.3 22.12 OSF1.50 ))20.W 4335.60 Min%-OSF 1562.61 1N.99 140.97 1455.6 22.13 OSF1.50 W/ .N 4454.51 MinPt-O-SF 15)).30 10].9) 1504.94 1469. 22.13 OSF1.50 8110.00 44W.W Min% -&SF 100.31 109.76 1526.]] 140.5 22.08 OSF1.W 8220.00 4521.49 Min!N ?SF 2878.89 235.00 2121.85 2843.8 18.4fi OSFi.W 14520.W 6663.66 Min% -O -SF 2911.35 231.50 2)52.64 2613.85 18.4] OSF1.50 14660.98 6923.15 Min% -O -SF 3025.81 242A5 2663.91 2)83.4 18.7 OSF1.50 1520.00 1081)4 Min%-OSF 3987.19 289.82 2693.6 2)9].3 160 OSF1.W 15530.00 7124.51 Min% -SF 3102.30 2W.W 290].99 28113 16. OSFt.N 15660.2] 7128.25 Min% MinPts 316249 29].46 203.86 286504 16.00 OSF1.50 16300.0 1113.36 Min 325.91 W5.09 3003.19 2901.82 15.81 OSF1.50 17050.00 8884.43 MInPt-O-SF 3210.90 292.38 W15.W 2918.5 16.5 O.SF1.60 17120.00 6854.66 Min%4JSF 3211.10 294.11 3020.3 2922.3 16.42 OSF1.W 17230.0 6607.89 Min% -O -SF 3221.)9 290.46 3025.15 292].33 16.46 OSF1.50 17452.56 8113.25 Min%s TD 238.13 32.81 236.84 205.32 N/A MAS =10.00 (ml 000 0.00 Pass 238.13 32.81 236.84 205.32 144748.39 MAS=1OW(mJ 35.25 35.25 Surface 23].31 3281 234.95 204.50 219.N MAS -10.00(m) 220.00 20.W WRP 231.35 32.81 239.88 204.54 iW.69 MAS =10.00(m) 240.00 240.00 MinF4s 285.11 32.81 258.9 232.31 53.56 MAS =10.00(m) 980.00 957.84 MINPr4Min% 265.14 32.61 258.8 232.34 52.W MAS=10.W (m) 91D.W 987,69 MIEOU 304.50 32.81 291.10 2)1.89 33.2 MAS =10.00 (m) 150.00 1413]4 MINPT-Min% )63.26 62.00 721.56 701.2 18.7 OSF1.66 4320.00 30)1.5] Min%4)SF 821.83 66.13 ]82.96 761.0 18.90 OSF1.W 0650.0 3194.26 Min%-OSF 1358.71 122.52 1216.65 1236.19 16.18 OSF1.50 7050.W 0088.52 Min%-OSF 146,97 102.68 1428.14 1394.29 2209 OSF1.50 1120.00 4335.0 Min% -O -SF 1582.6) 101.09 140.87 1455.58 22.11 OSF1.W 8040.00 4454.5) Min%-0SF 15]].30 108.98 1504.81 1069.2 22.11 OSF1.60 8110.00 0080.60 MmPt4D F 1600.31 109.81 1526.69 149045 22. OSF1.W 8220.W 4521A9 Min%-0SF 2818.89 235.27 2121.67 2843.6 18. OSF1.50 14520.N 8863.66 MinPI-O-SF 2911.35 231.]) 2152.8 2813.58 18. OSF1.50 146W.00 6923.15 Min% -0 -SF 2989.86 248.6 2823.) 2)41.1] 18.1 OSF1.50 15080.00 ]054.54 MmPI43SF 3039.51 250.10 2872.11 2]888 18.25 OSF1.W 15660.2) ]128.25 MinPls 3048.18 251.10 281WAS 2)9).0 182> OSF1.60 15850.98 7128.25 Min% -SF 30)9.58 250.70 2912.12 2828.86 1849 OSF1.50 163W.00 7113.36 Min% -O -SF 3090.8) 249.05 2924.51 2841.8 18.6 OSF1.50 16450.00 ]088.9] Min%ASF 3108.89 251.42 2940.] 285].2] 18.61 OSF1.W 16840.00 692.68 Min% -O -SF t.0 -SF 3109.03 251,98 2940.] 2857.0 18.58 OSF1.W 16910.0 6N3.W 3120.51 250.48 2953.26 28)0.10 16) OSFL50 11398.00 6118.12 Min%s 3128.06 250.28 2980.88 2811.78 18.82 OSF1.50 17452.56 8713.25 Min% -O -SF TD khlumbeTa,Ptl .te H16A-1-01(P3)(Def Plan) 238.13 32181 236.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 Pass 238.13 32.81 238.84205.n 144]48.39 MAS =10.001m) 35.25 35.25 Surtace 237.31 32.81 234.95 204.50 219.92 MAS =10.00 (m) 220.00 220.00 RP WR15 237.35 32.81 234.88 20454 199.69 MAS=10.W (m) 240.00 240.00 MinMINPTOEOU 285.11 32.81 256.90 232.31 53.54 MAS =ID.00 Im) 960.00 957.84 265.14 32.81 258. 232.34 5299 MAS =10,00(m) 970.00 96].89 Min%s 304.50 32.81 294.10 271.6 33.2 MAS =10.00(.) 1500.00 1473.74 MINPT-0.EOU 763.28 61.0 721.59 701.32 18.80 OSF1.W 4320.00 3071.57 Min%-OSP 827.83 66.69 782.99 761.1 18.92 OSF1.50 4850803194,n Min%-O-SF 1358.71 122.46 1276.69 1236.25 16.7 OSF1.50 7050.00 4088.52 Min%-O-SF 1496.97 102.59 1428.21 13943 22.12 OSFI.9 7720.00 4335.60 Min%ASF 1582.67 108.99 1490.97 1455.6 22.13 OSF1.W 8040.OD 4454.5] Min%-OSF 1577.30 107.97 1504.94 1469.33 22.1 OSF1.50 6110.9 448D.9 Min%-0-SF 1600.31 109.76 1526.77 1490.58 2208 OSF1.50 8220.00 4521.49 MinP1-0.SF 2878.89 235.00 2]21.8526Q.8 18.4 OSF1.W 14520.00 8863.88 Min%-0-SF 2911.35 237.50 2752.64 26]3.8 18.47 OSFI.9 14680.00 6923.15 Min%ASF 3025.87 242.45 2883.91 2783.42 1879 OSF1.50 152W.W 7NI.74 Min%-65F 3087.19 289.8 2893.8 2797.36 1603 OSF1.50 15530.00 7124.51 Min%O-SF t-ln SF 3102.30 290.98 2907.99 281132 16.0 OSF1.50 15660.27 7128.25 3162.49 29]48 298386 2865.04 16.00 OSFI.9 16300.00 7113.36 Min%OSF 3206.91 305.09 300319 2%1.82 15.81 OSF1.50 17050.0 6884.43 Min%-O-SF 321].17 29].1 3018.] 2820.02 16.29 OSF150 1]452.56 6713.25 Min%-O-SF M0-SF 1-116A-L04 (P3) (Def Plan) 238.13 32.81 236.84 205.32 N/A MAS =10.00(. 0.00 0.00 Pass) 238.13 32.81 236.86205.n 144748.39 MAB =10.00 (m) 35.25 35.25 Surface 237.31 32.81 234.95 2(X.50 219.92 MAS =10.00 (m) 220.00 220.00 WRP 237.35 M.811 234.88 204.54 199.69 MAB =10.00 (m) 240.00 240.00 Min% 265.11 32.81 258.8 232.31 53.56 MAS=10.0 (m) 96D.N 07.64 MINPT-0.EOU 265.14 32.81 258.88 232.34 52.99 MAS =10.00 (m) 9]0.00 987.89 MinPls 304.50 32.81 294.10 2]18 33.2 MAS=10.00(;) 100.00 1473.74 MINPTA-EOU 763.26 61.95 721.59 701.32 1880 0$Fi.9 4NO.W 3071.57 Min%-OSF 82TW 66.69 782.99 761.14 18.92 OSF1.50 4850.9 3194.28 Min%-0.5F 1358.71 122.46 1276.69 1236.25 16.]8 OSF1.50 709.00 4088.52 Min%-O-SF 1498.97 102.59 1428.21 1394. 22.1 OSF1.50 7720.00 4335.60 Min%ASF 1582.67 108.99 149.97 1455.6 22.1 OS%.W 8040.9 4454.57 Min%ASF 1577.30 107.97 104.94 1489.3 22.1 OSF1.50 8110.9 980.0 Min%-0.SF 16W.31 109.76 1526.77 149D.5 220 OSF1.50 8220.00 4521.49 Min%OSF 2878.89 235.00 2721.85 2W,8 184 OSF1.50 14520.00 6863.66 %ASF MinMinRO 2911.35 237.50 2752.64 26788 18.4] OSF1.W 1490.W 6923.15 F 3025.8] 242.45 2883.91 2783.42 18.]9 OSF1.50 1520D.W 701.74 Min%-O-SF 3087.19 2NA 2893. 279].36 160 OSF1.50 15530.00 7124.51 Min%OSF 3102.30 28098 297.99 28113 16.0 OSF1.50 1569.27 7128.25 MIOPIs 3162.49 297.46 2963.86 2865.0 16.00 OSF1.W 18300.00 7113.36 Min%-OSF 3206.91 305.09 3003.19 201.82 15.81 OSF1.50 17050.0 8884.43 Min%-0-SF 3210.0 292.38 3015.88 2918. 16.5 OSF1.50 17120.00 8854.68 Min%-O-SF 3217.10 294.71 3020.30 2922.39 18.4 OSF1.50 17230.00 697.89 Min%OSF 3221.79 294.46 3025.15 2927.33 16.46 OSFt.9 17452.56 6713.25 MlnPls TO H16A-LN(P3)(Del Plan) 23813 32.81 236.84 205.32 WA MAS =10.00(m) 000 0.00 Pass 238.13 32.81 23869 205.32 14474838 MAS =10.00 (m) 35.25 35 Surface 237.31 32.81 32.01 236.95 204.50 219.92 MAS=1O.OD(.) 220.00U0.00 W RP 237.35 32.81 234.88 204.54 199.69 MAS=IO.W (m) 240.0 240.00 MRla 285.11 32.81232.31 53.54 MAS =10.001m) 99.00 957.84 MINPT-O.EOU 285.14 32.81 258.258.9 232.34 52.99 MAS =10.00 (m) 970.00 967.69 Minft 304.50 32.81 294.10 271.6 33.2 MAS =10.9 (m) 190.0 14]3.]4 MINPT$EOU 763.26 61.95 721.59 701.3 18.9 OSF1.50 4320.9 3071.57 Min%-OSF 827.83 9.69 782.99 761.1 18.9 OSF1.50 469.00 3184.28 Min%-0.SF 1358.71 122.48 1276.69 12382 18.7 OSF1.50 ]050.00 4088.52 MinPf-OSF 1496.9] 102.69 1628.21 1394.3 22.12 OSFi.9 7720.9 4335.80 Min%-O-SF 1562.67 19.99 14W.W 1455.89 22.1 OSF1.50 940.W 4454.57 Min%-O-SF 1577.30 10LW 1504.94 14138.33 22.1 OSF1.50 8110.00 448D.W MmPIOSF Mln%OSF Schlumberger-Private 1600.31 109.76 1526.77 1490.m 22.0 OSF1.50 822D.W 4521.49 Min% -0 -SF 2878.89 235.00 2721.85 2843.89 18.46 OSF1.50 14520.0 6863.66 MRn%-O-SF 2911.35 237.50 2752.64 2873.85 18.47 OSF1.50 14680.0 8923.15 MinPt -SF 3025.87 242A5 2883.91 2783.42 18.7 OSF1.50 152W.W 7081.74 Min%-0.SF 3087.19 289.822893.64 L 279.36 16.0 OSF1.50 15530.00 7124.51 Min% 3102.30 290.98 207.99 2811.32 18.0 OSF1.50 1 W W.27 7128.25 Min% -O -SF 3162.49 297.48 2963.86 2865. 16.0 OSF1.50 IW0.00 7113.38 Min%-0.SF 320.91 30.09 3W3.19 2901.82 15.81 OSF1.50 17050.00 684773 Min% -0 -SF 3210.0 292.36 3015.66 2918,, 16.5 OSF1.50 17120.00 6W4.W MlnPt-O-SF 321].10 2N 711E OSF1.50 172W.N 6807.89 Min%s 3221.79 294.46 3025.15 2927.33 16.46 OSF1.50 17452.56 6713.25 TD H16A-t.02(P3)(Def Plan) Pass 238.13 32.81 236.84 205.32 NIA MAS = 10.00 (m) 0.00 0.00 Surface 238.13 32,81 236.84 205.32 144748.39 MA5=1000(m) 35.25 35.25 WRP 23].31 32.81 234.95 204.50 219.92 MRS =10.00 (m) 220.00 22D.00 Mine 237.35 32.81 234.88 204.54 199.89 MAS =10.00 (m) 240.00 240.00 MINPT-0-EOU 285.11 32.81 258.90 232.31 53.54 MAS=10.W (m) 9W.W 95].84 Mlnft 265.14 32.81 258.88 232.34 52.99 MAS = 10.00 (in) 970.00 987.69 MINPT-O-EOU 304.50 32.81 294.10 271.6 33.2 MAS=10.00(in) 150.0 1473.74 Min% -O -SF 763.26 61.95 721.59 701.32 188 OSF1.50 4320.0 3071.57 MmPtOSF 827.83 66.69 782.99 761.14 18. OSF1.50 460.00 3194.28 MInPl-O-SF 1356.71 122.461276.69 1236.25 i6.] OSF1.50 7080.00 406.52 Min!N -SF 1498.97 102.59 1428.21 1394.39 OSF1.50 7]20.00 4335.W Min% -0 -SF 1562.67 108.99 1490.97 1455.69 OSF1.50 8040.00 4454.57 Min% -O -SF 1577.30 107.97 1504.94 14%n OSF1.50 8110.00 4480.0 Wn%4}SF 180.31 109.78 1528.77 1490.56 e OSF1.50 8220.00 4521.49 Min%OSF 2878.0 235.00 2]21.85 2843.8 1846 OSF1.50 14520.00 883.0 Min%OSF 2911.35 237.50 2752.84 2873.85 18.4 OSF1.50 14880.00 6923.15 Min%OSF 3025.87 242.45 2883.91 2783.42 18] OSF1.50 1520.W 7081]4 Min%OSF 3087.19 289.8 2893. 2]9].36 1fi.0 OSF1.50 155W.W 7124.51 Min%s 3102.30 20.98 2W7.99 2811.32 16.04 OSF1.50 156W.27 7128.25 Min%OSF 3162.49 297.46 2983.86 2865.04 16.00 OSF1.50 100.00 7113.36 MsPIOSF 3206.91 30509 3003.19 2901.82 15.81 OSF1.50 I70W.N 6884.43 MsP1OSF 3210.W 292.36 3015.8fi 2918.54 16.5 OSF1.50 17120.00 6854.0 Min%OSF 3217.10 294.]1 3020.30 2922.39 16. OSF1.50 1]230.00 6807.89 Min%s 3221.79 294.46 3025.15 2927.33 16.46 OSF1.50 17452.56 6713.25 TD HIM-L05(P3)(Def Plan) Pass 238.13 32.81 236.84 205.32 NIA MAS =1D00(m) D.0 0.00 SUNace 238.13 32.81 236.84 205.32 144748.39 MAS =ID.W (m) 35.25 35.25 WRP 23].31 32.81 234.95 204.0 219.92 MAS =10.N (m) 220.0 220.0 Min%s _ 237.35 32.81 234.88 204.50 199.0 MAS =10.0 (m) 240.0 240.00 MINPT-O{OU 265.11 U. 258. 232.31 53.54 MAS-10.W(m) 980.0 957.84 Min%s 265.14 32.81 258.8 232.34 52.99 MAS =10.0(.) 970.0 967.69 MINPT-O-EOU 304.50 32.81 294.10 271.6 33, MAS =ID.W(m) 1500.0 1473.74 MlnPt-O-SF 76326 61.95 721.59 701.32 18. OSF1.50 4320.W 3071.57 MhPt-O-SF 827.83 86.69 782.99 761.14 18.82 OSF1.50 4650.0 3194.26 MinPfOSF 1358.71 122.48 1276.69 1236.25 18.] OSF1.50 7050.3 486.52 Min%-0.SF 1498.97 102.59 1428.21 1394.39 22.12 OSF1.50 7720.N 4335.60 Min% -O -SF 1562.67 106.99 149097 1455,69 OSF1.W W40.N 44.54.57 Min% -O -SF 1577.30 107.97 1504.94 1469,33 OSF1.W 8110.0 4480.60 Min% -O -SF i W0.31 109.76 1528.77 1490.56 228 OSFI.W 8220.00 4521.49 MinPbO-SF 2878.0 235.W 2721.85 2"3 89 OSF1.W 14520.00 000.613 MinPt-O-SF 2911.35 237.W 2752.64 2673.85 184] OSF1.W 14680.00 6923.15 MinPt-O-SF 3025.87 242.45 280.91 2783.42 18.791 OSF1.0 15200.W 7W1.74 MinPt-O-5F 3087.19 289.82 2893. 2]9].3 16,01 OSF1.W 15530.0 7124.51 MlnPm 3102.30 2N.N 29D]99 2811,321 16.04 OSF1.W 1500.27 7128.25 Min%-OSF 3162.49 297.48 290.86 285.04 16.00 OSF1.W 16WO.W 7113.36 Min% -0 -SF 3206.91 305.09 303.19 2W1.82 15.81 OSF1.W 17050.W 6884.43 Min% -O -SF 3210.N 292.38 3015.88 2918. 16.52 OSF1.W 17120.0 8854.66 Min%-OSF 3217.10 294.71 30203 2922.3 16.42 OSFI.W 17230.00 6W7.89 MinPts 3221.79 294.46 3025.15 2927.33 18.46 OSFI.W 17452.56 6713.25 TD Schlumberger -Private H16A-1-03 (P3) (Def Plan) 238.13 32.81 236.64 205.32 NIA MAS =10.00 (m) 0.00 0.00 Pass Surlace 238.13 23].31 32.81 236 84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS =10.00 (m) MAS=10.W(m) 35.25 220.00 35.25 220.00 WRP MinPlis 237.35 285.11 32.81 32.81 234.88 204.54 199.69 258.90 232.31 53.54 MAS =10.00(.) MAS =10.00(m) 240.00 980.00 240.00 957.84 MINPT-O-EOU MinPls 265.14 32.81 258.88 232.34 52,99 MAS =10.00(.) 970.00 967.89 MINPT-O-EOU 304.50 763.28 827.83 1358.71 1496.97 15132.87 32.81 61.95 86.69 122.46 102.59 106.99 294.10 271.6 721.59 701.32 782.99 761.14 1276.69 1235.25 1428.21 13!14 39 1490.97 1455,69 33. 18.80 18. 16.7 22.112 22.1 MAS =10.00(.) OSF1.W OSF1.50 OSF1.50 OSF1.50 OSF1.50 1500.00 4320.0 4650.0 7050.00 7720.00 8040.00 14]3.]4 3071.57 3194.28 4088.52 4335.60 4454.57 MinPl-OSF MlnPt-0.SF MlnP(-0.SF MInPt-O-SF MMR4)SF MMPI-OSF 1577.30 1800.31 2878.89 107.97 109.]6 235.00 1504.94 146933 152617 149D.56 2721.85 2643,89 22.1A 22..wI 18.46 OSF1.W OSF1.50 OSF1.50 8110.00 8220.00 14520.00 4480.60 4521.49 8863.66 MInP1-OSF Min% -O -SF MInPt-0-SF 2911.35 237.50 2752.64 2673.85 1847 OSF1.50 14880.00 8923.15 MInP1-OSF - 3025.87 3087.19 242.45 289. 2863.91 2783.42 18,79 OSF1.50 OSF1.50 15200.00 15530.00 ]081.]4 7124.51 MmRI F Min% 2893. 2797.3 16,03 3102.30 3162.49 290.98 297.48 2907.99 2811,32 16.1A 2963.86 2W5,04 16.60 OSF1.W OSF1.W 15880.27 16300.00 7128.25 7113.36 MinP1-OSF Min%-OSF 3206.91 3210.90 3217.10 305.09 292.36 294.71 3003.19 2901.82 15.81 3015.66 n1B.S4 16.52 OSF1.50 OSF1.50 OSF1.60 17050.0 17120.00 17230.00 6884.43 6854.68 6807.89 Min%-0.SF Min% -0 -SF Min% 3020. 2922.3 16.42 3221.79 294.48 3025.15 2927.33 1646 OSF1.50 17452.56 6713.25 TO H16A(P3)(Def Plan) 238.13 3281 236.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 Pass 6urface 238.13 23].31 3281 236.84 205.32 144748.39 32.81 234.95 204.50 219.92 32.81 234.88 204.54 19969 32.81 258.90 232.31 53.54 MAS =10.00 (m) MAS =10.00 (m) MAS =10.00 (m) MAS =10.00(m) 35.25 220.0 240.00 980.00 35.25 220.00 240.00 957.64 WRP MinPls MINPT-0.EOU Min% 23].35 285.11 265.14 32.81 256.68 232.34 52.99 MAS =10.00(m) 970.00 967.69 MINPTOEOU 304.50 763.28 82].83 32.81 61.95 8669 294.10 271.6 721.59 701.32 782.99 761.1 33.2 18.80 18.9 MAS=10.00(m) OSFt.% OSF1.50 1500.00 4320.00 4650.00 14]3.]4 30]1.5] 3194.26 MmPt-OSF MmPt-0.SF MinPIOSF 1358.71 122.46 1276.69 1238.25 16.7 OSF1.50 70W.00 4086.52 MInPtOSF 1498.97 102.59 1428.21 1394.3 22.1 OSF4.W ]720.00 4335.60 MmPt-OSF 1%2.67 157].30 1600.31 106.98 107.97 109.76 140.97 1455.8 1504.94 1469.3 1526.]] 1490. 221 22.13 22.08 OSF1.W OSF1.W OSF1.50 8040.00 8110.00 8220.00 4454.57 4480.60 4521.49 Min%-OSF MinPt-O-SF MmPt-0.SF 2878.89 235.00 2721.85 2843.89 18.4 OSF1.50 10.520.0 %63.% MhPIOSF 2911.35 3025.87 3087.19 3102.30 3162.49 237.50 242.45 289.82 290.98 297.46 2]52.% 267585 2663.91 2]834 18.4 18.] OSF1.50 OSF1.50 OSF1.50 OSF1.W OSFi.% 14807.00 15200.00 15530.00 15%0.27 16300.0 6923.15 7081.14 7124.51 7128.25 7113.36 MmPt-OSF MInPIOSF Mine MinPl-OSF MinPt-0.SF 2893.84 279].3 18.0 2907.99 2811.3 2983.86 2885.04 16.04 16.00 3206.91 3210.80 321].10 305.09 292.36 294.71 3003.19 290182 3016% 2918.54 15.81 16.52 OSFi.W OSF1.50 OSF1.50 1]050.00 1]120.0 1]230.07 6884.43 8854.% 6807.89 MinP1-0.SF MhPt-O-SF MinPls 3020.30 2922.39 18.4 3221.79 29446 3025.15 2927.33 1646 OSF1.50 17452.56 6713.25 TD Hi6P81(Def Survey) 238.13 32.81 236.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 Pass Surface 238.13 23].31 32.81 236.84 205.32 144748.39 32.81 234.95 204.07 219.92 MAS =10.0 (.) MAS =10.0(m) 35.25 220.00 35.25 220.07 WRP MinPls 237.35 285.11 31811 32.81 234 881 204.54 199.69 258.901L_232.31 53.54 MA5=10.00(m) MAS =10.00(.) 240.0 9W.00 240.0 957.84 MINPT-O-ECU m"PN S hlumberger-Private klhlumberger-Private M.14 32.81= 232.34 52.99 MAS =10.00 (m) 970.00 987.69 304.50 32.81 284.10 2]1.6 33.28 MAS=10.00 (m) 1500.00 14]3.]4 MINPT-O-EOU ]63.26 62.00 ]21.58 ]01.2] 18.] OSF150 432000 30]1.5] Min%OSF 82].83 66.73 ]8288 781.0 18.9 IF1.51 4650.00 3194.26 Min%-0SF 1358.71 122.52 12]8.85 1238.19 16.78 OSF1.W 7050.00 41)86.52 Min%-OSF 1498.97 102.68 1428.14 1394.2 22.0 OSF1.50 ]]20.00 4336.80 Min%-O-SF 1562.67 107.09 1490.90 1455.58 22.11 CSF1.50 8040.00 4454.51 MinPt-O-SF 15]].30 10808 1504.8] 1469.22 2211 OSF1.W 8110.00 4480.80 Min%OSF 1800.31 108.87 1528.89 1490.45 22.08 OSF1.50 822000 4521.49 Min%-0.SF 28]8.89 235.2] 2]21.6] ZBd3.58 184 OSF1.50 Min%-0.SF 2911.35 237.77 2]52.48 26]3.58 18.4 CSF1.50 14520.00 14680.00 6863.88 6923.15 MinPt-O-SF 2989.86 248. 2823.74 2]41.1] 16.10 OSF1.W 15080.00 7054.54 Minl`t SF 3039.5] 250.70 2812.11 2]88. 1825 OSF1.50 15680.2] ]128.25 MinPls 3048.18 251.10 2880.0.5 2]9].0 182] CSF1.50 15850.00 7128.25 MlnP1OSF 3079.58 260.70 2912.12 2828.8 184 OSF1.50 16300.00 7113.36 MmPtOSF 3090.87 249.05 2924.51 2841.8 18.68 OSF1.50 16450.00 ]088.9] MinPI-04tF 3108.89 251.4 2940.75 285].2] 18.61 OSF1.50 16500.00 6972.66 MInPt-0.SF 3109.03 251.9 2940.]2 2857.0 18.58 OSF1.60 16910.00 6943.96 MInPb 3120.57 250.48 2953.26 2870.1 18.76 OSF1.W 11300.00 6]]8.12 MlmFt 3128.06 250.28 2960.88 2877.78 18.82 OSF1.50 17452.58 6713.25 Min%-0-SF TD Sfanchkof State 1(Def Survey) 13221.03 3281 13219,74 13188.22 N/A MAS =10.00 (mJ 0.00 0.00 Pau 13220.75 32.81 13219.44 1318].94 448348.85 MAS =10.00 (m) 3525 35.25 Surtace W RP 13220.4 32.81 13218.38 1318].0 16316,95 MAS =10.00 (m) 250.00 250.00 13190.34 32.81 131]].81 13157.5 1173.7 MAS =10.00 (m) 910.00 908.51 MinRts 13081.06 32.81 13063.91 13048.25 826.63 AS M=10.07 (m) 1380.01) 1382.49 Min%-0% 12815.07 37.17 12789.81 12777.90 537.91 OSF1.50 1980.00 1890.]] Min%-O-SF 11404.74 49.45 11371.10 11355.29 360.6 OSF1.50 3830.00 2889.41 Min%OSF 9911.46 66.17 9866.36 980.5.2 235.20 OSF1.W 580000 354L4/ Min%-0SF 8]28.83 81 .1186]3.4 864].] 169.43 OSFi.W 705000 4086.52 Min%-0-SF 749888 80.29 7443.54 7418A 149.0 OSF1.50 8640.00 4877.64 Min%s 5559.93 126.05 5473.94 5433.8 69.31 OSF1.50 11550.00 5759.50 MmPt-DSF 4528.58 182.52 4405.77 4U6,04 37.88 OSF1.W 14220.00 6752.13 Min%-0SF 4350.70 20081 4218.45 4149.89 32.8 OSF1.50 15780.00 7128.25 Min%-"F 4339.12 200.31 4205.21 4138.81 328 OSF1.50 15870.00 7128.25 Min%-O-SF 4330.99 199.97 4197.31 4131.03 OSF1.W 15970.01) 7128.25 MinPI-OSF 4326.14 199.76 4192.60 4126.39 32.66 OSF1.50 18050.00 7128.25 Min%-O-SF 4320.98 199.59 4187.54 4121.39 32.fi5 OSF1.60 16180.00 7124.53 MmP1OSF 4319.58 199.57 4185.16 4120.01 32.64 OSF1.50 16240.00 ]119.8] MmPtO F 4318.59 99.48 4185.23 4119.11 32.8 OSF1.W 18300.01) 7113.36 Min%-0SF 4318.29 =s4- 195.5 4187.52111 4122.70 33.30 OSF1.50 1833000 7109.40 Mime MINPT-0.EOU 4318.10 195.02 418].]1 412308 33.40 0.4F1.50 16380.00 ]101.]8 4404.20 180.34 428360 422386 36.85 OSF1.W 17452.56 6713.25 Min%CtCt TD Cosmopolitan State 1 (Def Survey) 18223.16 32.81 18221.18 18190.35yi��IW-IpA�y MAS =1000 (m) 0.00 000 Pass 18223.13 32.81 1822115 18190.3= MAS =1000(m) 2000 20.00 Surface 18223.12 M81FE1=1111 18190.31 N/A MAS =10.00 (m) 30.00 30.00 Min%-O-SF 18223.12 32.81 18221.14 18190.31 N/A MAS =10.00(m) 35.25 35.25 MINPT-O-EOU 18038.42 32.81 18029.78 180056 27219 MAS =10.00(.) 1500.00 14]3.]4 WRP Min%-"F t-"F 13688.31 65.42 13693.10 13622.8 338.8 OSF1.W 7050.00 4086.52 11002.49 81.80 10845.84 10920.8 222.10 OSF1.W 1041000 5335.6] 8182.55 151.04 8078.61 W31.50 W.] CSF1.50 14407.00 8841.38 Min%OSF 6922.33 182.67 6797.40 6739.6 59.8 OSF1.W 16300.00 ]113.36 Min%-0SF 6158.12 191).20 0728.81 5965.92 50.65 Min%-OSF OSF1.W 17452.W 6713.25 Masts klhlumberger-Private Offset Trejectory I_ T /Blow Sep. I Controlling Reference Tra ecto Rlsk Lavol Alert Sfahs 1-104L02 (Pt) (Def Plan) 1-104-1-03 (P1) Anti -Collision Summary Report Analysis Date44hr Time: September 25, 2018- 11:14 Analysis Method: Normal Plane Client: BlueCresl Reference Trajectory: H04.1-03 (Pi) (Def Plan) Field: Cosmopolitan Unit Depth Interval: Every 10.00 Measured Depth (0) Structure: Cosmopolitan Pad Rule Set: DBM AntiCollislon Standard 5002 v5.1/5.2 Slot: H-04 Min Pts: All local minima indicated. Well. H04 Version I Patch: 2.10.544.0 Borehole: H04-1-03 Database Project locelhoatldrilling-Cook Inlet Scan MD Range: 18900.00ft-19250.37ft Tralectory Error Model ISCWSAO 3-0 95.000% Confidence 2.7955 sigma, for subject well. For -8571 -142,941 OSF1.50 16910.00 Trajectories Summary Offset Selection CriteriaOffset 0.17 Wellhead distance scan: Restricted within 60260.87 ft -143.06 -0.Ot OSF1.50 Selection filters: Definitive Surveys - Definitive Plans -Definitive surveys exclude definitive plans MiuPI-O-SF - All Non -Def Surveys When no Def -Survey is set in a borehole -All Non -Def Plans when no Def -Plan is set in a borehole 0.39 Offset Trejectory I_ T /Blow Sep. I Controlling Reference Tra ecto Rlsk Lavol Alert Sfahs 1-104L02 (Pt) (Def Plan) Fall Mb)or 0.00 27].63 -185.52 -2]].63 -0.01 OSF1.50 16900.00 ]12664 OSF<5.00 OSF<L50 OSF<t00 Enter Major 0.04 142.98 -8571 -142,941 OSF1.50 16910.00 7126.25 0.17 143.2 -95.75 -143.06 -0.Ot OSF1.50 16920,00 7125.89 MiuPI-O-SF 0.39 143.50 -9570 143.1 -0.01 OSF1.50 16930.00 7125.56 MINPT-O-EOU 98.00 147.33 -0184 49.33 0.99 OSF1.50 17428.66 ]12].01 OSFNl 00 MinPt-O-ADP 144.32 147.43 45.61 -3.11 1.47 OSF1.W 17550.11 7127.82 OSFN.50 Exit Major 338.13 113,84 261.81 224.29 4.49 OSF1.50 16654.00 6949.78 Exit Minor TD H04-LOi(Pi)(Def Plan) Warning Alert 205.3] 142.881 109.69f 62,491 2.16 OSF1.50 16900.00 7126sal OSF15.00 413.13 146.63 31482 266.30 424 OSF1.50 17332.52 7126.37 Enter Alen TD Hansen #1A (Dei Survey) 2468.38 741.84 1973.83 172816 5.00 OSF1.50 18342.05 8994.03 OSF<S00 Warning Alen 2143.18 ]44.1] 1646.75 1399.02 4.32 OSF1.50 19250.37 8613.25 Enter Alen Mirpl, Hansen #1 (Det Survey) 2545.34 740.66 205112 1804.86 5.16 OSF1.50 18192.32 7043.66 Pass 2545.46 741092051.05 1804.36 5.16 OSF1.50 18223.49 ]0M24 MinPt-QCl 2565.61 741.29 2051.08 1804.32 5.16 OSFI.60 18238.72 7029.47 MINPT-O-EDU 2546.61 741.81 2051.]2 180418 5.15 OSF1,50 18282.99 7014.93 MinM.O-ADP 28]6.80 75627 2172.28 192053 5.31 OSF1.50 18805.60 6801.20 Mirlet F MlrPt-O-SF Hansen #1AL1 (Def Survay) Fess 284165 686.46 210500 195].19 5.60 OSF1.50 1]004.88 7124.25 2641.84 664.90 2184.89 1956.94 5.79 OSF1.% 17020.67 7124.23 MinPl-CiCt 2842.04 885.12 218494 1956.91 679 D$F1.50 1]028.58 7121.25 MINPT-O-EOU 2647.42 687.82 2188.52 1959.60 5.78 OSF1,50 17091.24 7124.76 Min% -D -ADP 2974.5 ]142 2498.01 2260.26 6251D$F1.59 19250.37 MinPt-0$F 8613.25 MinPta HI OPB1(Def Survey) Pass 3095.6] 256.83 2925.59 2841.04 18.30 0SFls0 16926.26 712568 3095.75 254.90 292549 2640.85 15.26 OSF1.50 16962.19 MinPt-=t 7124.76 MINPT-O-EOU 309584 255.00 2925.51 2840,84 1820 OSF1.50 189]5.45 ]124,53 3096.85 255.20 2926.35 28418 1826 OSFI.W 17034.51 ]124.2] MhiPt43-ADP MIaPt-0SF 3089.60 256.02 292860 28435 1822 OSF1.W 17089.43 ]124.]5 313500 258,66 2962.23 2876.3 18241 OSF1.W 18117.17 7064.36 MInPt-OSF 314213 259.28 2969.55 2683.45 18.24 OSF1.50 18258.38 7023.13 MioPt-0.SF 3174.50 262.85 2998.94 2911.65 18.18 OSF1.50 19130.73 8863.81 MhPt- SF 31]].90 283.17 300213 291413 18.18 OSF1.50 19250.37 6613.25 MinPt-OSF Minlet-OSF Schlumberger -Private 116(Def Survey) 31195.6] 254.63 2925.59 2841.04 18.30 OSF1.50 1692626 7125.68 3095.75 254.90 2925.49 2840.85 18.28 OSF1.50 18962.19 7124.76 3095.64 255.00 2825.51 2840.84 18.28 OSF1.50 16975.45 7124.53 3098.85 255.28 2926.35 2841.59 1821 OSF1.50 17034.51 ]124.2] 3099.60 256.02 2928.80 2843.58 1-82 OSF1.50 17069.43 7124.75 3135.00 258.68 2982.23 2876.33 18.2 OSF1.50 18117.17 7064.36 315716 260.82 2983.55 2806,941 18.22 OSF15D 18582.00 6904.14 3204.95 26274 3029.46 294221 18.36 OSFt50 19250.37 6613.25 Hi SA -L01 (P3) (Def Plan) 299.72 3000.59 290102 16.07 OSF1.50 17777.58 7121.90 3192.3] 2989] 299407 2895A0 16.17 OSF1.50 16900.00 7126.64 3198.38 297.66 2997.59 2898.6 161 OSF1.50 17004.76 712425 3200.07 29837 3000.83 2901.]16.1 OSF150 1]087.0] 7124.73 3208.02 299.59 3008.98 29N.431 16.12 OSF1.50 17605.26 7128.18 3216.74 299.49 30W76 2917.26 16.16 OSF1.1 17923.21 7104.51 Pass MInPI-CtCI MINPT-O-EOU MinPt-O-ADP MinPt-O-SF MInPt-O-SF MmMP F MInPI.O-SF TD Pas. Min%s MinP40 SF MinPt-O-SF MtnPt-0 SF TD Hi6A-1-05(P3)(Daf Plan) Pass 3192.37 296.9] 29940] 2895.40 16.1] OSF1.50 16900.00 7126.64 Min%s 3196.37 297.56 2997,67 2898.81 16.161 OSF1.50 16995.08 7124.31 MinPI-O-SF 3200.51 299.4 30005 2901.08 16.08 OSF1.50 17608.11 7128.20 MinPls 321.54 2994 3000.55 2901.05 1808 OSF1.50 17653.35 ]12].99 MINPT-O-EOU 3200.58 299.54 300056 2901.0 16.08 OSF1.50 17674.09 7127.53 MinPt-0-HDP 3200.74 299.72 3000.59 290102 16.07 OSF1.50 17777.58 7121.90 3200.75 299.73 3000.80 2901.01 16.07 0SF1.1 17]84.18 7121.35 MINPT43.EOU MlnPI-OADP 3211.75 302.27 3009.91 2909.48 1599 OSF1.50 18477.29 6939.94 MmPt-OSF 321519 302.56 3013,15 2912.6315.9 OSF1.50 18577.23 6897.70 Min% -O -SF 3255.34 30404 305232 295130 16.11 OSF1.50 19250.37 6613.25 TO H16A-L07(P3)(Def Plan) 3192.3] 296.97 2994.07 2895.40 1617 OSF1.50 16900.00 ]126.64 Pass MinPts 3196.37 29].56 2997.67 2898.81 16.1 OSF1,50 1699506 7124.31 MMPI -O -SF 3280.51 2994 3000.Sfi 29010 16.0 OSF1.50 17608.11 7128.20 MinPls 3200.54 MA 3000.55 2901.05 16.08 OSF1.50 17653.35 ]12].99 MINPT-O-EOU 3200.58 299.54 3000.5 29D1.0 1608 OSF1.50 17674.09 7127.53 MMPI-OADP 3200.74 299.] 3000.5 2901.02 16.07 OSF1.1 1777].58 7121.90 MINPT-O.EOU 3200.75 299.73 3000.8 2901.01 111.0] OSF1.50 17784.18 7121.35 MmPt- ADP 3211.75 30227 3009.91 290948 15.99 OSF1.50 18477.29 6939.94 MInPt-O.SF 3215.19 302.56 3013.15 2912.63 15.99 OSF1.50 18577.23 689])0 MmPt3 F 3255.34 304.04 3052.32 2951.30 16.11 OSF1.50 19250.37 8613.25 TO H16A(P3)(Def Plan) - 3192.3] 296.9] 29940] 2895.40 16.1] OSF1.50 16900.00 ]12fi64 Pass MlnPls 3196.37 297.56 299787 2898.81 16.1 OSF1.50 16995.06 7124.31 MmPt-O-SF 3200.51 299.43 I 30005 2901.0 16.08 0SF1.1 17808.11 7128.20 Min%s 3200.54 299.4 3000.5 290105 1608 OSF1.50 17653.35 ]12].99 MINPT-O-EOU 3200.58 299.54 3000.5 2901.0 16.08 OSF1.50 11674.09 ]12].53 MtnPt-O-ADP 3200.]4 299.7 3000.59 2901.02 160] OSF1.50 177]].58 7121.90 MINPT-O-EOU 3200.]5 299.73 3000. 2901.01 1607 OSF1.50 1]784.18 7121.35 MinPt-OADP 3211.75 302.27 3008.91 2909.48 1599 OSF1.50 1847].29 6939.94 MlnPt-OSF 3215.19 302.56 3013.15 2912.8 15.99 OSF1.1 18577.23 6897.70 MmPt-OSF 3255.34 304.04 305232 2951.30 16.11 OSF1.50 1925037 661325 TO H16A-L1(P3)(De Plan) 3192.3] 295.97 2994.0] 2895.40 t6 t> OSF1.50 16900.00 7126.64 Pass 3186.37 29].56 299]6] 2898.81 16.16 OSF1.50 16995.06 7124.31 Min%s MInRI SF 3200.51 299.4 3000.56 2901.08 1608 OSF1.50 1761.11 7128.20 MInft 3200.54 2994 3000.55 -E221 225 18.00 OSF1.60 17653.35 ]127.99 MINPT-O-EOU 3200.58 299.54 301.56 2901.0 16.08 OSF1.50 17674.09 ]12].53 MinPt-OADP 3200.74 299.72301.5 290102 16.07 OSF1.1 177]7.58 7121.90 MINPT4 EOU 3200.]5 299.73 3018 2901.01 16.07 OSF1.50 17784.18 7121.35 MinPt-OADP 3230.1 305.52 3026.89-2925.38 15.91 OSF1.1 19250.37 6013.25 MlnPI-O-SF SchlumbeMer.Private H16A-L06(P3)(Def Plan) Pass 3192.3] 296.97 2994.07 289540 16.17 OSF1.50 16900.00 7126.64 Min% 3196.37 297.56 2W7 67 2898,,6Jlf 16.1611 OSF1.50 16995,06 7124.31 32011.51 289.4 300056 2901 DDNJ 160 OSF1.50 17608.11 7128.0 Min% -0 -SF 3200.54 289.4 3000.55 2901.05 18.08 Mine OSF1.50 17853.35 7127.98 MINPT-O{pU 3200.58 299.54 3000.56 2901.0 16.08 DSF1.50 17674.09 7127.53 Min% -0 -ADP 3200.74 299.7 300D.5 29D1.02 16.07 OSF1.50 1777].58 7121.90 MINPT-O-EOU 3M0.75 299.73 30011.60 2901.01 16.07 OSFIM 17764.18 7121.35 Min% -O -ADP 3211.75 302.27 3009.91 2909.48 15.99 OSFI.% 18477.M 6939.94 Min%-OSF 3215.19 302.56 3013.15 2912.6 15.99 OSF1,% 18577.23 6897.70 Min% -0 -SF 3255.30 304.04 3052.32 2951.30 1611 OSF1.50 19250.37 6613.25 TO H16A-L04(P3)(Def Plan) 3192.37 296.9] 2994.0] 289540 16.1] OSF15p 1690000 Pass ]126.64 MlnPts 3196.37 297.56 299767 2898.81 16.1 OSF1.50 18995.06 7124.31 MIn%-0SF 3M0.51 29943 3000.56 2901.0 16.0 OSFIM 171M8.11 7128.20 Mins 3M0.54 2WAOLL 3000.55 2901.05 16.08 OSF1.50 17853.35 7127.99 MINPT-0-EOU 3200.58 299.54 3000.5 2M1. 18.08 OSFi.% 17874.08 7127.53 Min% -O -ADP 3200.74 299.7 3000.5 290102 1807 OSF1.50 17777.58 7121.90 MINPT-0{01J 3200.75 2M 3 300060 2901.01 16.07 OSF1.50 17]84.18 7121.35 Min% -O- OP 3211.75 302.27 3009.91 2909.481 ISM OSF1.50 18477.29 %39.94 Min% -O -SF 3215.19 30256 3013.15 2912.63 15.91 OSF1.50 18577.23 689770 MlnR-"F 3254.84 304.16 3051]4 2950.68 16.10 OSF1.50 19250.37 6613.25 TD H16A-L02 (P3) (Def Plan) 3192.3] 296.97 29940] 2895.40 16.1] OSF1.50 1690000 ]126.84 Pass 3196.37 297.56 299767 2898.81 16.16 OSF1.50 16995.06 7124.31 MinPls 3200.51 2WAIL 3MO,5gl 29010 16.08 OSF1.50 17608,11 MinPt-OSF 7128.20 MIn%S 320D.54 2%.43%0.5 290105 16.08 OSF1.50 17653.35 7127.98 MINPT-O-EOU 3200.58 299.54 3000.5 2901.04 1808 OSF1.50 17874.09 719.53 MinPt-0 DP 321267 304.24 3009.51 2908431 15.89 OSF1.50 18962.37 6734.95 MinPt-OSF 912-1-01 (Def Survey) Paas 4054.06 .53 271 387271 3782.53 22.4] OSFL50 1703078 7124.25 MinPt-CtC1 4054.06 271.54 38]2.]1 3]8252 22.4] OSF1.50 1704046 7124.32 4054.12 271.6711 3782.45 2246 OSF1.50 MINPT-O-EOU 17068.74 7124.% MINPT-O-EOU 4054.18 271.]3 38]2.89 3]62. 22.46 OSF1.50 17063.07 7124.54 Min% -0 -ADP 4056.66 92.02 3872.98 3]82. 22.4 OSF1.50 1]084.78 7124.72 Min% -O -SF 4062.78 272.67 3880.67 379011 22.4 OSF1.% 17592.91 7128.10 MIn%-0SF 4024.42 318.14L3811.% 3708.27 19.03 OSF1.50 18818.13 6795.91 W% H12-L02(Def Survey) Pass 4054.06 2]1.53 3872.71 378253 22.47 OSF1.50 1703078 7124.25 MinPt-qCt 4054.06 271.5 38]271 3782.52 22.47 OSF1.50 17040.46 7124.32 MINPT-O-EOU 4054.12 27t6l 378245 2246 OSF1.50 17058.74 7124.50 MINPT-O-EOU 4054.16 271.73 3872.% 3]824L 2246 OSF1.50 17063.07 7124.54 4054.66 272.02 3872.88 37U 2241 OSF1.50 MmPt ADP 17080.76 7124.72 Min%-0SF 4059.34 272.57 3877.30 3788.7 22.41 OSF1.50 17%4.25 7128.18 Min%-0SF 4049.9 273.03 3867.84 3776.96 22.33 OSFIM 17958.51 7098.84 Min% -M 405000 273. 386]. 3778.95 22.32 OSFI.% 17965.61 7088.84 MmPls 0049.01 273.49 3868.36 3775.52 22.28 OSF1.% 18185.28 7045.72 Min%-CIQ 0049.02 273.523866.34 377550 22.28 OSFi.% 18194.98 7042.% MINK-O-EOU 404904 273.54 386635 37]5.50 22.28 OSFi.% 18204.62 7040.00 Min% -O -ADP 4050]3 27404 386771 3]]6.69 22.25 OSF1,50 18375.79 6981.33 4052.00 2]].20 3868.8] 3774,801 22,001 OSF150 19250.37 6613.25 Min%s mim% 1412-1.03 (Def Survey) Pass 4054.0 271.53 38]2.]1 3782.53 22.47 OSF1.50 1703018 7124.25 MinPl-C1Ct 4054.06 271.543872.71 3782.52 22.47 OSFI,W 17040.48 7124.32 MINPT-O-EOU 0054.12 271.671 376245 22.46 OSFI.% 17058.74 7124.50 MINPT-O-EOU 4054.16 271.73 381269 3782.44L_2246 OSF1.50 17063.07 7124.54 Min% -O -ADP 405466 272.02 3872.98 3762.63 22531 OSF1.50 17084.76 7124.72 MIn%-O-SF Schlumberger-PrWate 4059.34 2]2.5] 3877.30 3786.77 22.41 OSF1.50 17604.25 7128.18 4049.9 273.03 64 3776.96 2233 OSF1.50 1]958.51 ]09884 MIn%OSF 4050.00 273.0 --M67 366784 3776.95 22.32 OSF1.50 17888.61 708684 Min%-CIQ 4049.38 273.3 3886.] 3]]5.99 22.29 OSF1.50 18146.30 7056.67 MlnPts Mins 4049.40 273.42 3888.80 3]]5.9 22.29 OSF1.50 18155.92 7054.04 4049.]1 274,4] 3866.40 3775.24 22.21 OSF1.50 18519.89 6921.94 Min% -O -ADP 4052.1 275.13 3868.43 377705 22.17 OSF1.50 187]332 6814.84 Min%s 4052.18 275.15 3868.43 37]]0 22.18 OSF1.50 18]82.39 6811.01 MmPt- Ct 4053.21 27648 3868.5 37]6.73 22.Ml OSF1.50 19250.37 6613.25 MinPts MmPls 1112-104 (Def Survey) Pass 4054.0 271.53 M72 71 3782.53 2247 OSF150 1]030]8 7124.25 4054.06 2]1.54 3872.]1 3782.52 22.47 OSF1.60 17040.46 7124.32 MmPt CtCt 4054.12 2]1.6] 3782.45 22.46 OSF1.50 17058.74 7124.50 MINPT-O-EOU 4054.16 -n72.6ML 271.73 3872.69 3782.4L 22.48 OS%.50 17063.07 7124.54 MINPTOEOU MmP1-O-ADP 4054.86 272.02 3872.98 3782.6 22.43 OSF1.50 17084]6 712412 4059.34 272.57 38]].30 3786.77 22.41 OSF1.50 17604.25 7128.18 Min%-OSF 4069. 273.03 386264 3776.96 22.33 OSF1.50 17958.51 7098.64 Min% -0 -SF 4050.00 273.0 3867.64 377695 22.32 OSF1.50 17988.61 7098.84 MinPt-CICt 4049.38 273.3 3888.79 3]]599 22.29 OSF1.50 18146.30 7058.87 Min%s 4049.40 273.42 3866.80 1 3775.99 22.29 O.SF1.50 18155.92 7054.04 Minft 4049.71 274.47 3886.40 3775.241122.21 OSF1.50 18519.89 6921.94 Min% -O -ADP Min% 4052.1 275.13 3888.43 3777.05 22.17 OSF1.50 18]]3.32 6814.84 4052.19 275.1 3888.4 3]]7. 22.16 OSF1.60 18782.39 6811.01 Min%-ClQ 4054.29 275.45 3870.33 3778.84 n.151 OSF1.50 18909.50 6757.30 Minft 4068.57 276.16 3884.14 3792.41 22.17 OSF1.50 1925037 6613.25 MIn%-O-SF TD H12(Def Survey) Pass 9056.0 271.53 3872.71 378253 22.47 OSF1.50 17030.78 7124.25 4054D6 271.5 38n.71 3782.53 22.47 OSF1.50 17040.48 MinPt-CtC1 7124.32 MINPT-O-EOU 4054.12 271.8 3872.6 3782.45 2246 OSF1.50 17058.14 7124.50 4054.16 271.72 3872.69 3782. 2246 OSF1.50 17083.07 7124.54 MINPT-O-EOU MaP1-O-ADP 4054.66 272.02 3872.98 3]8264 22.4 OSF150 17084.76 7124.72 405934 272.58 3877.30 378617 224 OSF1.50 17804.25 7128.18 MIn%OSF 4049.9 273.02 3867.65 377696 22.33 OSF1.50 17958.51 7098.64 Min%-OSF 4050.00 273. 3867. 37]6.96 22.32 OSF1.50 17968.61 7096.84 Min%-CICt 4049.38 273.3 3 8011 3775.99 22.29 OSF1.50 1814630 706.67 Min%s 4049.40 213.41 3866.8 3775.99 22.29 OSF1.50 18155.92 7054.4 Min%s MMP10ADP R404971 2]4.41 3866.40 3775.24 22.21 OSF1.50 18519.89 8921.94 40521 275.13 3868.43 377705 22.11 OSF1.50 18773.32 6814.84 Minft 4052.19 275.15 38684 3]170 22.16 OSF1.50 18782.39 6811.01 Min%-CtM 4054.29 275A5 3870.33 3778.84 22.15 OSF1.50 18909.50 6757.30 Wpm 4068.57 27616 3884.14 3792.41 22.17 OSF1.50 19250.37 661325 MIn%-O-SF TD H12-LOS(DefSurvey) -- 4054.0 2]1.52 3872.71 3782.53 2247 OSF1.50 1]030]8 7124.25 4054.06 271,511 387271 3782.53 22.47 OSF1,50 1]040.46 7124.32 MinPl-CICt 4054.12 27156 3872.68 378246 22.46 OSF1.50 17058.74 7124.50 MINPT-0EOU 4054.16 271.72 3872.69 3182.45 22./8 0$%.50 17063.07 7124.54 MINPT-0EOU 4054.66 272.02 38]299 3]82.64 224 OSF1.50 11084.76 7124.72 Min% -0 -ADP 4059.34 272.56 3877.30 3786.78 2242 OSF1.50 17604.25 7128.18 Min% -O -SF 4049. 273.02 3867.65 3776.97 22.33 OSF150 17958.51 7098.84 MIn%-O-SF 4050.00 273.0 3867.65 3]]6.98 22.32 OSF1.50 17968.81 1096.84 Min%-CICt 4049.38 273.3 3888.80 3]7800 22.29 OSF1.50 18148.30 1058.67 Min%s 4049.40 273.41 3886.80 3]]5.9 22.29 OSF1.50 18155.92 1054.04 MIn%s 4049]1 274.48 3866.40 3775.24 22.21 OSF1.50 18519.89 6921.94 Min% -O -ADP Min% 4052.1 275.12 3866.44 37]]06 22.17 OSF1.50 18.43.32 6814.84 Min%-Cn 4052.19 275.14[:l868.4 31]7.05 22.17 OSF1.50 18782.39 6811.01 Mins 4054,n 275.44 3810.33 37]8.85 22,151 OSF1.50 18909.50 6757.30 Min% -O -SF 4068.57 216.15 3884.14 3192.42 22.17 OSF1.50 19250.37 6613.25 TD H12-LO6(Def Survey) Pass 0054.0 271.53 381271 3782.53 2247 OSFL50 17030.78 7124.25 Min%-C1C1 Schlumberger -Private 4054.06 271.53 3872]1 3782.53 22.47 OSF1.50 17040.66 7124.32 4054.12 271,W M72.6Q 3782.45 22A6 0SF1.50 1705834 7124.50 MINK] EOU 4054.16 271.72 3872.6 2L62 44 22.48 OSF1.50 1)063.0] 7124.54 MIN"-O-EOU 4054.66 272.02 3872.98 3782. 22.431 OSF1.50 1]084.]6 7124.72 Min%-O-AOP 4059.34 272.58 3877.30 3786.77 22A 0SF1.50 17604.25 7128.18 Min% -O -SF 4049. 273.02 3867.65 377696 22.33 0SF1.50 17958.51 7098.64 Min% -O -SF 4050.00 273.04 388]. 3)]8.9 22.32 OSF1.50 17968.61 7086.84 MmP1-QCt 4049.38 273.39 3866.8 3775.99 22.29 OSF1.50 18146.30 7056.67 Min% 4049.40 2]3.41 3866.8 3775. 22.29 OSF1.50 18155.92 7054.04 Mins 404.9.]1 2]4.4] 38%.40 377524 22.21 0SF1.50 18519.89 692194 MinPt-O-AOP 0052.1 275.13 3868.43 37]]05 22.17 0SF1.60 187]3.32 6814.84 Minft 4052.19 275.1 3868.4 8)]7,0 22.16 OSF1.50 18782.39 6811.01 Min%-QCI 4054.29 275.45 3870.33 3778.84 22.151 OSF1.50 18909.50 6757.30 Min% 4068.57 276.16 3884.14 3792.41 22.17 0SF1.50 19250.37 6613.25 MinPt-O-SF TO H14PB2(EW Survey) 45]3.62 256.03 4403 9dl 4319.5 27.12 OSF1.50 16900.00 4577.11 25474 9406.92 4322.37 2].0 OSF1,50 17003.65 7126.66 7124.26 WPMWPMPass 4559.94 257.90 4387.65 4302.04 26.63 0SF1.50 (8095.00 7069.92 MmPt-O-SF 4559.97 258.0 438].58 4301.93 26.61 0SF1.50 18133.40 7060.13 MmPt4Ct 4559.99 258.07 4387.58 4301.9 26.61 0SF1.50 18142.94 7057.58 MINPr EOU 4597.38 377.13 43456011 4220.25 18.33 OSF1.50 19110.60 66]2.31 Min%-C4iDP Mins H14PB1(Def Survey) ' 4694BMRA9 2542 4525.19 4440.]8 27.81 OSF1.50 16900.00 7126.64 Pess 4]0051 256.12 4529.43 4444.39 27.63 OSF1.50 17327.63 7126.34 MlnPts 4700.53 256.17 4529.4 4444.3 27.62 O$%.50 17347.63 7126.47 MmMP CtC1 4]05.05 258.69 4533.59 6448.36 27.5 OSF1.50 1]54156 7127.80 Minft 4688.08 261.17 6513.64 4426.91 27.02 OSF1.50 18723.22 6838.01 Min%4SF 4688.10 261.21 4513. 4426.90 2].02 0SF1.50 18732.35 6832.16 Mln%47tCt 4706.53 263.38 4530.62 4463.151 26.90 0SF1.50 1925037 661325 MinM Mine -O -SF H14PB3(Def Survey) Pass 4]5430 254.10 4564.56 4500.19 28.17 OSF1.50 1690915 ]126.26 4]5].]4 254.76 4587.5] 45029] 2612 0SF1.50 169%.79 7124.28 MinPts 4770.22 256.70 4588.76 4513.52 D.98 0$%.50 17605.80 7128.19 Min%-OSF 4]70.85 258.51 4598.18 4512.34 27.78 OSF1.50 18177.61 7047.94 Min%-OSF 4770.89 258.5 4598.16 4512.30 2717 OSF1-50 18196.65 7042.38 Min%-CICt 4770.95 258.67 4598.184512.29 2717 QSFL50 18215.59 7036.68 MINPT-O-EOU 4816.45 263.39 4640.53 4551061 27.53 0SF1.50 19250.37 661325 Min% -O -ADP Min% -O -SF H14 (Def Sone,) 6858.61 255 87. .)9 4696 4603.02 28.60 (XF1.50 18904.)8 7126.65 Pass 4860.79 256,91 4689.1 4603.89 2848 0SF1.50 17071.16 7124.62 Min%s 4664.14 25737 4692.24 4606.] 2845 (XiF1.50 17209.23 7125.55 MInPt-O-ADP 4878.74 258.33 470620 4620.4 28.431 OSF1.50 17808.74 7128.21 Min%-OSF 4889.90 260.16 4716.13 462973 28.29 OSF1.50 18222.80 7036.52 Min% -O -SF 468991 260.2 4716.12 6629.71 28.29 OSF1.50 18232.10 7031.56 Min%-CICt 4892.5 261.67 4717.78 4630.89 28.15 0SF1.50 185%.06 W03.27 Min%a 4892.58 HI.75 4717.7 4630.84 28.14 0SF1.50 18582.87 6895.32 Min%-CtCt 4892.62 261.79 4717.7 4630.8 28.13 0SF1.50 18582.28 6891.34 MINPT EOU 4894.71 263.41 4718.77 4631,29 27.97 OSF1.50 18958.42 6736.62 Min% -O -ADP 4894.74 263.50[4718._7M3 1.24 27.98 OSF1.50 18977.08 8728.73 MIs%-CIQ 4894.77 26354 4718.75L_g3i.23JL 27.% OSF1.50 18988.42 6]24.79 MINK-O-EOU 4903.41 284.74 4726.59 48386] 2].88 0SF1.50 19250.37 6613.25 Min% -O -ADP Min%-OSF Survey) Pass 642198 13296 8332.96 6289.02 73.06 OSF1.50 1845295 6950.22 6421.98 132.91 6332.99 6289.07 7309 OSF1,50 18458.1] 6948.02 Min%s ]]6327 115.54 7685.62 764].]4 101.91 OSF1.50 19250.37 6613.25 MInPt-CICt TO Sunny) Pass 4]49.69 252.25 4561.20 449744 26.35 OSF1.50 16795.86 7128.14 MinPt-CtCt Schlumberger -Private H14 (Def Survey) Survey) H14(Def Survey) 4749.76 252.46 4581.13 4497.30 28.33 OSF1.50 16802.81 7128.19 Pass 4749.85 252.58 4581.15 449].29 28.31 OSF1.50 16805.98 7128.21 MINPT-O-EOU MinPt -ADP 4763.37 259.654589. 50 43.]1 27.82 OSF1.50 17257.24 ]0]8.]9 MINPTOEOU 4763.73 260.13 458998 4503.8 27.57 OSF1.W 17283.87 7072.59 253.8 4769.0 265.12 4592A5 4504.41 27.08 OSF1.% 17539.28 254.4 Min% -0 -ADP 460649 28.7 OSF1.50 17150.00 T1N.33 MinPN 254.5 13995.02 MInPI-O-ADP 4782.55 275.5 45W55 4507.05 26.13 OSF1.W 18027.33 6791.96 MINPTOEOU 4783.08 276.14 4598.66 28.07 OSF1.50 18055.11 6780.22 Min% -O -ADP 4798.97 284.01 4809.30 4514.Nl 25.43 OSF1.50 18379.17 8&13.25 4]31.38 464669 28.80 OSF1.50 18269.0 6710.W MinPls Min% -0 -SF 4832.10 252.47 4663501 45796711 28.8 OSF150 16120.71 7125.69 Pass 483814 2N).Mj 4670.5 4%72 29.03 OSF1.50 18452.12 7123.36 MlnPts 4838.1 250.91 467054 4587.23 29.03 OSF1.50 18458.60 7123.45 Mm%6 MinP.CICI 4861.13 259.4 46878 460173 28.21 OSF1.50 17146.34 7100.71 18417.92 4861.36 259.70 4887.90 4601.% 28.18 OSF1.50 17164.72 7097.51 MINPT-O{OU 4902.50 2]8.81 4716.30 4623.69 WA6 OSF1.50 18109.65 6757.17 Min% -O -ADP 4913.19 285.40 4722.60 462].]9 2591 OSF1.50 18379.17 6643.25 Min%OADP 16003 41.91 MAS -10.00(m) 1020.00 1016.79 MinPls MINPT-0-EOU Min% -O -SF 203.62 18102 23.8 MAS =10.00(.) 1500.00 Pass 4781.96 2559 48109 4525.99 28.13 OSF1.50 1805080 6798.76 2390.00 4782.49 256,51 4611.ifi 4525.99 28.0] OSF1.50 18090.00 6781.85 Min%s Min%s 479145 256.38 4620.20 4535.07 28.14 OSF1.50 1841792 6843.25 TO 4]90.36 4838.93 4859.45 4860.89 4860.91 48]0.2] 4687.08 4895.58 4903.7] 490901 703116 55]0.02 192.81 192.84 213.82 347.75 %2.41 871.06 1225.1] 1%7.24 2642.44 2720.48 2845.58 29]9.17 3125.56 3572.94 3%2.30 3915.85 42W.11 44]4.02 4%9.30 408.36 4790.38 4837.41 4874.16 Pass 247.02 4625.35 45433 29.20 OSF1.0 16150.00 7126.16 Mine 251.80 4868.] 458513 28.92 OSF1.W 16440.00 7124.16 MlnPls 2530 469041 4606.3 28.91 OSF1.50 1]020.00 ]121.58 Min%s 253.8 4691.11 4606.81 2882 OiF1.50 17100.00 7113.23 MINPT-O�EOU 254.4 4890.97 460649 28.7 OSF1.50 17150.00 T1N.33 MinPN 254.5 4700.22 4615.8 28.8 OSF1.W 17540.00 7008.62 Min% 25866 4716.29 4831.3 28.7 OSF1.W 17920.00 6853.70 Min% -O -SF 2%.48 4724.2 4839.1 28.7 OSFi.W 1090.0 6781.85 Min%s 2580 4]31.38 464669 28.80 OSF1.50 18269.0 6710.W MinPls 25].]8 4736.83 4651.23 28.67 OSF1.50 18417.92 6643.25 TO Pass 180.51 692.64 685065 fi160 OSF1.50 16150.00 7126.16 Min% -O -SF 198.4] 5435.42 53]1.54 43.55 OSF1.0 18417.92 6643.25 Min%s 32.81 187.20 159.69 46.37 MAS=10.0(m) 960.0 947.99 32.811 186.98 16003 41.91 MAS -10.00(m) 1020.00 1016.79 MinPls MINPT-0-EOU 32.81 203.62 18102 23.8 MAS =10.00(.) 1500.00 1473.74 32.81 330.80 314.94 22.13 MAS =10.00 (m) 2390.00 2201.56 MinPt SF 32.81 335.26 319.60 22.13 MAS=10.00 (m) 2410.00 2215.45 MInR-OSF MMM-OSF 57.20 832.49 813.85 23.33 OSFi.% 4070.00 2978.63 73.38 1175.87 1151.79 25.41 OSF1.W 5120.00 33%.89 Min%-OSF 119.32 1W7.32 1767.92 23..Rl OSN.50 705000 4086.52 MMR -O -SF 124.48 2%9.07 2517.96 32.1 OSF1.50 9310.0 4926.72 MInPI-O.SF 128.05 204.73 2592.42 32.1 OSF1.50 9540.00 012.23 Min%OSF 134.92 2755.26 2710.67 318 OSF1.50 9910.00 5149.]9 Min%OSF 142.14 2884.03 2837.02 31.68 OSF1.W 10310.00 5298.50 Min%-04iF Min%-OSF 149.51 3025.51 29760 31.59 OSF1.50 1240.00 5458.36 MlnR-OSF 176.17 3455.11 3396.77 30.61 OSF1.0 1200.00 5949.10 MinPI-OSF 1W.21 3531.78 3472.0 30.% OSF1.W 1230.0 608.33 Min% -O -SF 194.22 3788.00 3721.63 30.41 OSF1.50 1300.0 6320.87 216.27 4113.55 4041.84 29.6 OSF1.50 1420.00 Min% -O -SF N0.37 Mtn%OSF 228.65 4321.22 4245.3829.4 OSF1.50 14710.00 6934.30 Min%OSF 233.42 4413.31 4335.8 29.5 OSF1.50 1500.00 7033.03 MMM-OSF 244.32 4525.17 44*1.06 OSF1.W 15480.00 7121.09 MlnM-O-SF 247.04 4625.34 4543.32 29.201 OSF1.W 16150.0 7126.16 MinPt-O-SF 25177 4699.2 4%5.6 28..2A OSF1.50 16440.0 700.95 Min%s 252ALL 4705.54H Q21 72 11 29.07 OSF1.50 1700.00 %80.18 Min%5 S hlumbsgse Private 4876.58 253.55 4]0].2 4623.0 28.96 OSF1.50 17180.00 8829.15 MmP1-O-ADP 48]6.6] 253.62 4]07.2] 4623.0 28.95 OSF1.50 17190.00 682990 MinPt-O-SF 4883.32 252.76 4714.49 4630.56 29.09 OSF1.50 17452.58 6713.25 TO H14PB2(Def Survey) Pass 19809 32.81 196.81 165.29 NIA MAS = 10.00 (m) 000 000 Surface 198.0 32.81 196.81 165.29 WA MAS =10.00 (m) 30.00 3D.00 MmR. 19809 32.81 196.81 165.29 152204.12 MAS =10.00 (m) 35.25 35.25 ww 196.32 32.81 196.88 165.51 52919 MAS =10.00(m) 120.00 12000 MINPT-O-EOU 192.81 32.81 1 BT.201 159,801 48.37 MAS =10.00(.) 950.00 947.99 Wft 192.84 32.811 immi 180.03 41.91 MAS =10.00(m) 1020.00 1016.79 MINPDO-EOU 213.82 32.81 203.82 181.0 23. MAS =10.00(m) 1500.09 1473.74 MInM-OSF 347.75 32.81 330.80 314.94 22.12 MAS=10,00(m) 2390.00 2201.56 MmM-O-SF 352.41 32.81 335.26 319.60 22.12 MAS=10.00(.) 2410.09 2215.45 Mine-OSF 8]106 57.21 832.49 613.85 23. OSF1.50 407000 297863 MInP-O-SF 1225.17 73.39 1175.87 1151.78 2541 OSF1.50 512000 3388.99 Wi -O-SF 1887.24 119.33 1807.31 1]6].91 23.94 OSF1.50 7050.00 4086.52 MmRSF 2642.44 124.49 2559.06 2517. 32.12 OSF1.50 9310.00 4926.72 MInPtO-SF 2720.48 128.07 2834.72 2592.41 32.1 OSF1.50 9540.00 5012.23 MMRF 2845.58 134.93 2755.25 2710,65 31.8 OSF1.50 9910.00 5149.79 MinPt-0SF 2979.17 142.16 2884.81 2837.0 316 OSF1.50 10310.00 5298.50 MInPt-OSF 3125.56 149.53 3025.49 2976,03 31 S81 OSF1.50 10740.00 5458.36 MmM.OSF 3572.94 176.19 3455.10 3396.7 30. OSF1.50 12080.00 5949.10 MInPI-OSF 3852.30 180.23 3531.]7 U72 07 30.56 OSF1.W 12300.00 6038.33 Minh.&SF 3915.85 194.24 3785.98 3721.61 3041 OSF1.W 130/1000 6320.87 MinM-O-SF 4258.11 216.30 4113.53 0041.81 29.68 OSF1.50 14070.00 6696.37 MinPt-O-SF 4474.02 228.68 4321.2D 4245.35 2949 OSF1.50 14710.00 6830.30 MhR-OSF 4569.30 233.45 4413.29 433565 29.50 OSF1.50 15000.00 703303 MlnPt-O-SF 4802.70 256.5 0431, 4346.20 270 OSF1.50 16300.00 7113.36 Minft 4588.82 251.82 4420.58 433].0 2745 OSF1.50 16830.00 8976.58 MlnPt-O-HDP 4588.]9 251.] 0429.58 4337.01 27.45 OSF1.50 18840.00 6972.66 MINPTOEOU 4588] 251.67 4429.61 4337.08 21.46 OSF1.50 18870.00 6960.65 MinPt-CtCt 4597.22 253.12 4428.11 4344.10 27.35 OSF1.50 17220.00 6812.14 MinM.OSF 459439 253.46 442505 4340.92 27.3 OSF1.W 17430.00 672284 MinP1-O-SF 4594.11 25341 4424.81 4340.] 27.30 OSF1.50 17452.56 671325 MinPls H14PB3(Daf Survey) Pass 198.09 32.81 196.81 165.29 NIA MAS =10.00 (m) D00 000 Surtace 198.09 3281 196.81 165. A NIA MAS=IOM (m) 30.00 30.00 MmR. 198.09 32.81 196.81 165.29 152204.12 MAS =10.00 (m) 35.25 35.25 WRP 198.32 32.81 196.68 165.51 529.79 MAS =10.00(m) 120.00 120.0 MINPT-O-EOU 182.61 32.81 18720 1%.801 46.37 MAS =10.00 (m) 950.00 90799 Minft 192.84 32.8111 186.wj 160.03 41.91 MAS =10.00 (m) 1020.00 1016.79 MINPTOEOU 213.82 32.81 203.62 181.02 23.84 MAS =10.00 (m) 1500.00 14]3.]4 MinPt-OSF 347.75 32.81 330.80 31494 22,12 MAS =10.00 (m) 2390.00 2201.56 MInR-OSF 352.41 32.81 335.25 319.60 22.12 MAS =10.00 (m) 2410.00 2215.45 Mi t-OSF 871.06 57.21 832.49 81185 23.33 OSF1.W 4070.0 2978.63 MinPI-O-SF 1225.17 73.39 1175.87 1151.7 25.41 OSF1.50 5120.00 3388.99 MinPt-O-SF 1887.24 119.33 1807.31 1767.91 23.94 OSF1.50 7050.00 0086.52 MhPtOSF 2642.44 124.49 2559.06 2517.94 32.12 OSF1.50 9310.00 4926.72 WRn SF 2720.48 128.07 2834.72 2592.40 32.13 OSF1.50 9500.00 5012.23 MaPIOSF 2845.58 134.94 2755.25 nm.65 3189 OSF1.50 9910.00 5149.]9 MmPtO !` 29]9.17 142.16 2884.01 283700 3167 GSF1.50 10310.00 5298.50 MmRSF 3125.56 149.53 3025.49 2976.02 315 OSF1.50 10700.00 5458.36 MInNI SF 3572.94 176.20 3455.09 3398.74 30.6 OSF1.50 12060.00 5949.10 MInPtOSF 3652.30 180.24 3531.] 34]2.0] 30,50 OSF1.50 12300.00 803833 MI M1 F 3915.85 194.24 3785.98 3721.61 3041 OSF1.50 13080.00 6320.87 MInM-OSF 4258.11 216.30 4113.53 4041.81 29.68 OSF1.50 10070.OD 6696.37 MmR-OSF 4474.02 228.68 4321.19 4245.34 2948 OSF1.W 14710.0 6934.30 MinPt-O-SF 4569.30 233.45 4413.29 4335.85 29.49 OSF1.50 15000.00 7033.03 MInR1 SF 4698.46 247.18 4533.31 4451.28 28.6 OSF1.50 15550.00 ]125.5] MinNs 4724.39 247.39 4559.13 4477.00 28.7 OSF1.50 15780.00 7128.25 MMRSF 4729.62 248.45 4563.65 4481.16 28.6 OSF1.50 15830.00 7128.25 MInPIOSF 6chlumbeM,Prwate 4745.88 251.9 45)).56 4493.89 28.36 OSF150 18000.00 7126.25 Mhaft 4755.04 253.17 4585.93 4501.87 2828 OSF1.50 16300.00 7113.36 Min%-OSF 4761.93 252.18 4593.48 45N.75 28.43 OSF1.5D 16470.00 7084.85 Min%-OSF 4761.34 251.87 4593.09 4509.4 28.46 OSF1.50 16570.00 7061.23 Min%-O-ADP 4781.31 251. 4593.0 4509.47 28.46 OSF1.W 18580.00 7058.59 MINPT40-EOU 4)61.26 251.70 4593.13 4509.56 28.48 OSF1.50 16620.00 7047.53 Min%-CtCt 4781.38 251.73 4813.2 4529.65 28.j 05F1.50 1732000 6769.62 MinPN 4784.69 251.65 461659 4533.04 28.63 OSF1.50 1745256 6713.25 TO H16A-L07(P3)(Def Plan) Pass 238.13 32.81 23684 205.32 NIA MAS =1000 (m) 000 0.00 Surface 238.13 32.81 236.84 205.32 144748.39 MAS =10.00(m) 35.25 3525 WRP 23].31 32.81 234.95 204.50 219.92 MAS =10.00 (m) 22000 22000 MinP6 237.35 32-511 234.88 204.54 199,69 MAS =1000 (m) 240.00 240.00 MINPT-O-EOU 265.11 32.81 258.9 232.31 53.54 MAS =10.7 (m) 960.00 957.84 Min% 285.14 32.81 258.8 232.34 52.99 MAS =10.00 (m) 97000 967.69 MINPT-O-EOU 304.50 32.81 294.10 271.6 33.26 MAS-ION(m) 150000 14]3.]4 Min%-O-SF 763.26 61.95 721.59 )01.32 18.80 OSF1.50 4320.00 3071.57 MiaPt-O-SF 82].83 88.89 782.99 ]61.14 189 OSF1.50 4850.00 3194.26 Min%-0.SF 135671 122.46 12)869 1236.25 16.] OSF1.50 7050.00 4088.52 MmPt4 F 1498.9) 102.59 1428.21 1394.39 22.1 OSF1.50 7)20.00 4335.60 Min%-O-SF 1582.6) 106.99 1490.97 14558 22,13 OSF1.50 8040.00 4454.57 MinPI-O-SF 1577.30 10).9] 1504.94 1469.3 2213 OSF1.50 8110.00 4480.60 Min%-OSF 1600.31 109.76 1526.]7 14W5 2208 OSF1.50 8220.W 4521A9 Min%-O-SF 2878.89 235.00 2721.85 2843.8 18. OSF1.W 14520.01) 6863.66 Min%-0.SF 2911.35 237.50 2752.64 2673.85 18.47 OSF1.50 14680.00 8923.15 MinPt-O-SF 3025.8] 242.45 2863.91 2783.42 18.7 OSF1.50 1520000 7081.74 MinPt4}SF 3081.19 289.82893.6 279].36 16.0 OSF1.50 1553000 )124.51 Minft 3102.30 2W,9 290].99 2811.32 16.0 OSF1.50 15660.27 7128.25 Min!N }SF 3182.49 27.46 2983.88 2865.04 16.001 OSF1.50 1837.00 7113.36 MinPt }SF 3208.91 30509 W03.19 2901.82 1581 OSF1.50 17050.00 6864.43 MinPt-"F 3210.90 292.36 301508 291854 1652 OSF1.W 17120.00 6854.86 Min!R 3SF 3217.10 294.71 3020. 2922.3 1642 OSF1.50 17230.00 8807.89 MinPb 3221.79 294.46 3025.15 2927.33 16,46 OSF1.50 17452.56 671325 TO H16(Daf Survey) Pass 238.13 32.81 236.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 Su ae 238.13 32.81 238.84 205.32 144748.39 MAS =10.00 (m) 35.25 35.25 WRP 23].31 32.81ff258 204.50 219,92 MAS=10.00(m) 220.00 22D.W Minft 237.35 32.81204.54 199.69 MAS =10.00 (m) 240.00 240.00 MINPT-O-EOU 265.11 32.81232.31 53.54 MAS=10.00 (m) 97.00 95).84 Mhaft 32.81232.34 5299 MAS =10.00(m) 970.00 967.69 MINPT40-EOU 304.50 32.81 294.10 271.6 33.2 MAS =10.00(m) 1500.00 1473.74 Min%-OSF )83.26 62.01) 721.56 701.2 18.78 OSF1.W 4320.00 3071.57 Min%-O-SF 827.83 66.73 782.98 )61.0 18. OSF1.W 4WOW 3194.26 Min%-0.SF 1358.71 122.52 1276.65 1236.19 1678 OSF1.50 7050.7 4088.52 Min%-0.SF 1496.9] 10286 1428.14 1394. 22.0 OSF1.50 n20.00 4335.60 Min%41SF 1562.67 17.09 1490.90 145558 2211 OSF1.50 80413.00 4454.57 MMP(-QSF 1577.30 108.08 1504.81 1469.22 22.11 OSF1.50 8110.00 4480.W Min%-OSF 16W.31 109.87 1526.7 1490.451 22,06 OSF1.50 8220.00 4521.49 Mri-R 3 F 2878.89 235.27 2721.67 2643.82 18. OSF1.50 14520.00 886388 Min%-0SF 2911.35 237.77 2152,45 2673.58 OSF1.W 1468OW 723.15 Min%-0SF 2989.86 mm= 2741.1 18.1 OSF1.W 1507.00 7054.54 N9n% 3039.51 250.70 2872.11 27N.88 OSFLW 15680.27 7128.25 Min%-0SF 3048.18 251.10 28W.45 279T08 OSF1.W 15850.00 7128.25 Min%-OSF 379.58 250.70 2912.12 282888 OSF1.50 16300.013 7113.36 Min%-O-SF 3090.87 249.05 2924.51 284182 18.68 OSF1.W 16450.00 7088.97 Min%-0SF 3108.W 251.4 2940.] 285].2 18.61 OSF1.W 18840,00 6972.66 Min%s 3109.03 251.9CE2940.] 2857.06 18.58 OSF1.50 18910.7 6943.98 Min%s 3120.57 2W.48 2953.26 2870.10 16,76 OSF1.50 17300.W 778.12 MmPt- SF 3128.06 250.28 2950.88 2877.78 18.82 OSF1.50 17452.56 6713.25 TO Hi6A-LOt(P3)(Dot Plan) Pass 238.13 32.81 236.84 205.32 NIA MAS =1000(m) 0.00 000 Surface 5chlumberger-Private 238.13 23].31 32.81 236.84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS =10.00(.) MAS =10.00(.) 35.25 220.00 35.25 220.00 WRP MinPts 237.35 285.11 32.81 32.81 234.88 258.9 204.54 199.69 232.31 53.54 MAS=10.00 (In MAS=t0.W(m) 240.00 980.00 240.00 957.84 MINPT-O. 01J Min% 265.14 32.81 258.8 232.30 52.99 MAS=10.00(m) 970.00 967.69 MINPT-O£OU 304.50 32.81 294.10 271. 33.2 MAS =10.00 (m) 1500.00 1473.74 MmPt-O-SF 763.26 827.83 1358]1 1496.97 1562.67 1577.30 1600.31 2878.89 2911.35 61.95 86.69 122.48 102.59 106.99 107.97 109.76 235.00 237.50 721.59 782.99 1276.69 1428.21 1490.97 1504.94 1526.77 2]21.85 2752.134 701.3 761.1 12382 13N 39 1455,69 W9.33 1490.56 2643.89 2673.85 186 18.9 167 22.12 22.13 22.13 22.0 18.4 184 OSF1.50 OSF1.50 OSF1.50 OSF1.W OSF1.W OSF1.W OSF1.50 OSF1.50 OSF1.50 4320.00 4650.00 7050.00 7720.00 8040.00 8110.00 6220.00 14520.00 14860.00 3071.57 3194.26 4086.52 4335.60 4454.57 4480.60 4521.49 8663.88 6923.15 MmPt-O-SF MInPt43-SF MhN-OSF MinPt-OSF MInPt-0-SF MinPt-O-SF MInRt SF MsPt-O-SF MinPt-OSF 3025.87 3087.19 3102.30 3162.49 242.45 2863.91 289.821 2893,641 290.98 2907.99 297.46 2983.86 2783 42A 167 OSF1.50 OSF1.W OSF1.W OSF1.W 15200.00 15530.00 15880.27 16300.00 7081.74 7124.51 7128.25 7113.38 MInPI-OSF Minpb MinPt-0.SF MMPI-0.SF 2797.36 16,031 2811.3 2865.04 16.0 16.00 3206.91 321].1] 305.09 297.1 3003.19 2901.82 15.81 OSF1.50 OSF1.50 1705000 17452.56 8884.43 6713.25 MmPt( SF Min% 3016] 2920.2 16.29 H16XL04 (P3) (Df Plan) Pass 238.13 32.81 238.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 Surface 238.13 237.31 32.81 236.84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS -10.00(m) MAS=10.00(.) 35.25 220.00 35.25 220.00 WRP MlnPta 237.35 285.11 32.81 32.81 234.88 258.9 20954 199.89 232.31 53.54 MAS = low (m) MAS=10.00(.) 240.00 WON 240.0 957.84 MINPT-O-EOU MInPIs 265.14 304.50 32.81 32.61 258. 294.10 232.34 271.69 52.99 33,2] 32 MAS =10.00(.) MAS =10.00(m) 970.0 1500.00 967.69 1473.74 MINPT-O-EOU MmPt-O-SF 763.26 61.95 721.59 701.32 1880 OSF1.50 4320.00 3071.57 MmPt-O-SF 827.83 1358.71 1496.97 1582.67 1577.30 1600.31 2878.89 2911.35 66.69 122.48 102.59 108.99 107.97 109.76 235.00 237.50 782.99 1278.69 1428.21 1490.97 1504.94 1526.77 2721.85 2752.64 7611 1238.25 1394.3 145669 1069.33 1490.66 2643.89 2873.85 1692 167 22.12 22.13 22.13 22.8 ISAA 18.4 OSF1.50 OSF1.50 OSF1.W OSF1.W OSF1.50 OSF1.50 OSF1.50 OSF1.50 4650.00 7050.00 7720.00 8040.0 8110.0 8220.0 14520.00 14680.00 3194.26 4088.52 4335.60 4454.57 4080.60 452149 8863.86 W23.15 MmPt-OSF MmPt-0SF MinPt-OSF MinPt-0.SF MmPt-O-SF MhPI-O-SF MInPt-O-SF MinR1 F 3025.87 3087.19 3102.30 242.45 289.82 290.98 2883.91 2]83.4 187 O R.5015200.00 OSF1.W OSFi.W 15530.00 15880.27 7081.74 7124.51 712825 MlnPt-0SF MinPte MinPt-O-SF 2893. ZIB].3 16.0 2907.99 281132 1604 3162.49 297.46 2963.86 21365 04 16,130 OSF1.50 16300.0 7113.36 MinPt-O-SF 3206.91 3210.90 3217.10 305.09 292.36 290.71 3003.19 3015.66 2901.82 2918,54 15.81 16.52 OSF1.50 OSF1.50 OSF1.50 170SON 17120.00 17230.00 6884.43 6654.138 6807.89 MinPt-O-SF MIIRt SF MinPN 3020.3 2922.39 16.42 3221.79 294.46 3025.15 2927.33 1646 OSF1.50 17452.56 6713.25 TO H16A-LOB(P3)(Def Plan) 238.13 238.13 23].31 32.61 236.84 205.32 N/A 3281 235.84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS =10.00 (m) MAS =10.00 (m) MAS =10.0 (m) 0.00 35.25 220.OU 0.00 35.25 220.60 Pass Surace WRP Min% 237.35 285.11 32.81 32.81 234.88 258. 201.54 199.60 232.31 53.54 MAS=10.00 (m) MAS =ION (m) 240.00 9W.W 240.00 957.84 MINPT-O-EOU Minn. 255.14 32.81 258.88 232.34 52.99 MAS = ION (m) 970.00 967.60 MINPT-O-EOU 304.50 3281 294.10 271.W 33.2 MAS =10.00(.) 1500.00 1473.74 MinPt-0SF 763.26 61.95 721.59 701.M 18.8 OSF1.50 4320.00 3071.57 MinPt-0 F 827.83 66.69 782.88 761.14 18.9 OSF1.W 4650.00 3194.26 MmPt-0SF 1358.71 122.48 1276.69 12M.25 1678 OSF1.W 7050.00 4088.52 MInPt-O-SF 1496.97 1562.67 1577.30 1600.31 2878.89 102.59 106.99 107.97 160.76 235.00 1428.21 1490.97 1W4.94 1526.77 2721.85 1394,39 145569 1469.33 1490.56 2643.89 2212 22.13 22.13 22.08 18.46 OSF1.W OSF1.50 OSF1.50 OSF1.50 OSF1.50 7720.00 WON WON 8220.60 14520.00 4335.60 4454.57 4480.60 4521.49 8883.66 Min% -0 -SF MInPt-0-SF MinPt-O-SF MIOPI -O -SF Mi,,R- SF Schlumheger-Private 2911.35 237.50 2752.64 2673.85 18.4] OSF1.W 14880.UD 6923.15 3025.87 242.45 2883.91 2783a2 18 ] OSIF 50 15200.00 7081.74 MlnPt-O-SF 3087.19 M9.821 2N3.OW4 2]9].3 18.0 OSF1.50 15530.00 7124.51 MInPt-OSF 3102.30 290.98 290].99 2811.32 16.00 0SF1.50 15660.27 7128.25 Min% 3162.69 297.46jWj[jWj::jgAl 3.86 2 OSF1.50 18300.00 ]113.36 MInP604iF 3206.91 305.0903.19 2 OSF1.50 1]050.00 8884.43 MmP1-OSF 3210.90 292.385. 2 OSF1.50 1]120.00 8854.86 MInPt-O-SF 3217.10 294.]1 0$F1.W 17230.00 6807.89 MaPI-O-SF 3221.79 294.46 3025.15 2927.33 16.46 OSFi.W 17452.56 6713.25 Mi.% TO H16A-L02(P3)(Def Plan) 238.13 32.81 236.84 205.32 WA MAS-10.W(m) 0.00 080 Pass 238.13 32.81 23684 205.32 144]48.39 MAS=10.00 (m) 35.25 35.25 SudaceWRP 23].31 32.81 23495 204.50 219.92 MAS=10.00(m) 220.0 220.00 237.35 32.81 234.88 206.54 199.69 MAS=10.00 (m) 240.00 240.00 MinPls 265.11 32.81 258.90 232.31 53.54 MAS =10.00 (m) 960.00 95].84 MINPT-0-E00 265A4 32.81 258.8 232.34 52.99 MAS =10.00 (m) 970.00 967.69 Min% 304.50 32.81 294.10 271. 33. MAS =10.0 (m) 1500.0 1673.]4 MINPT-0-EOU EOU 763.26 61.95 721.59 701. 188 OSF1.50 4320.00 3071.57 Min% _ 827.83 66.69 782.99 781.1 18.9 OSF1.50 4650.00 3196.26 MinP10SF 1358.]1 122.6 1276.69 1236.25 16.7 OSF1.W 7NUD 4088.52 MMR SF 1496.97 102.59 1428.21 1394.3 22.12 OSF1.W ]]20.0 4335.60 MinPt-OSF 1582.8] 108.99 1490.97 1455.89 22.1 OSF1.50 8040.00 4454.5] MMM-0.SF 1577.30 107.97 1504.96 1469.M 22.1 0$F1.50 8110.00 4480.60 MinRt SF 1600.31 109.76 1528.]] 14N,56 22.0 OSF1.W 8220.00 4521.49 MlnPt-0 F 2878.89 235.00 2721.85 2643.8 18. OSF1.W 14520.00 6863.68 MinPt-OSF 2911.35 23].50 2752.64 M73.851====1844 OSF1.50 14880.00 6923.15 MlnPt-O-SF 3025.87 242.45 2863.91 2783.4 18.7 OSF1.50 15200.00 ]081.]4 MmPt-0.SF 3087.19 289. 2893. 2797.3 16.0 OSF1.W 15530.00 7124.51 Mii-R-0 F 3102.31) 29D.W 2907.99 28113 16.4 OSF1.W 151360.27 7128.25 Min% 3162.49 297.46 2963.86 2885.0 16.00 OSF1.50 18300.0 7113.36 MlnPt-O-SF 3206.91 305.09 3003.19 2901.82 15.81 OSF1.50 17050.00 8884.3 MinPt-0.SF 3210.90 292.36 3015.68 29185 16.52 OSF1.50 17120.00 6856.66 MinPl-OSF 321710 294.71 3020.30 2922.3 16.4 OSF1.W 17230.00 681)].89 MInPt-t4 "F 3221.79 294.46 3025.15 2927.33 16.46 OSF1.50 17452.56 6713.25 Min% TO H16A-L05 (P3) (Def Plan) 238.13 32.81 236.84 205.32 WA MAS 1000(.) .00(.) 000 Pass 238.13 32.61 236.84 205.32 144748.38 MAS=10.00 (m) 35.256.25 35.25 Surface 23].31 32.81 234.95 204.50 219.92 MAS =10.00 (m) 220.00 220.00 WHP 237.35 32.81 234.88 204.54 199.69 MAS: 10.00(m) 240.00 240.00 MWRP 285.11 32.81 258. 232.31 53.54 MAS =10.00(m) 960.00 95].84 MINPT-O-EOU 285.14 32.81 258.8 232.34 52.99 MAS=10.00 (m) 970.00 987.69 MiEOU _ 304.50 32.81 294.10 271.6 33.2 MAS=10.00 (m) 1500.0 1473.74 MINPT-O{OU ]63.26 61.95 ]21.59 ]01.3 18.8 OSF1.50 4320.00 30]1.57 MInPt-0.SF 827.83 66.69 782.99 781.1 18.9 OSF1.W 4650.00 3196.26 MinPt-0 F 1358.]1 122.48 1276.69 1236.2 16.78 OSF1.W ]050.00 4086.52 MinPt-OSF 1496.97 102.59 1428.21 1394.3 2212 OSF1.50 ]]20.0 4335.60 MmPt-0.SF 1562.67 108.99 1490.9] 1455.69 22.13 OSF1.50 8040.00 4454.5] MInPt-0.SF O -SF 157].30 107.97 1504.94 1469.33 22.13 OSF1.50 8110.00 4480.60 MmRP 1W0.31 109.76 1528.]] 1490.5 22.0 OSF1.50 8220.00 4521.49 MInPt-OSF 2878.89 235.00 2721.85 2643.8 18.46 OSF1.W 14520.W 6863.66 MinPt-04F 2911.35 23].50 2752.64 2873.85 18.6] OSF1.50 14000.00 W23.15 MlnPI-OSF 3025.87 24245 2883.91 2]83.42 18.7 OSF1.50 15200.00 7081.74 MinPl-O-SF 308].19 289.8 2893. 2]9].3 168 OSF1.50 15530.00 7124.51 MInR-0.SF t -i Ss 3102.30 290.98 290].99 28113 16.0 OSF1.W 15680.2] 7128.25 3162.49 2974 20MW.86 2865.0 16.00 OSF1.W 16300.00 ]113.38 MInPt-OSF 3208.91 305.09 3003.19 2901.82 1581 OSF1.50 170W.W 6886.43 MInPI-OSF 3210.90 292.36 3015 W 2918.54 18.5 OSFL50 1]120.00 6854.66 MWWP SF 3217.10 294.71 3020.30 2922.3 16.4 OSF1.5D 17230.00 680]89 MinPFOSF 3221.79 29445 3025.15 2927.33 16.46 OSF1.0 17452.513 6713.25 Min% TO H16A-L03 (Pal (Del Plan) Pass khlumber8ef-Private 238.13 32.81 236.84 20532 WA MAS =10.00(m) 0.00 0.00 238.13 32.81 238.84 205.32 144748.39 MAS =10.00(m) 35.25 35.25 mace 23].31 32.81 234.95 204.50 219.92 MAS =1O.W Im) 220.00 220.00 WRP 237.35 32.81 234.88 20454 198.89 MAS =10.00 (m) 200.00 24080 MinPls 265.11 32.81 258.90 232.31 53.54 MAS=10.00(m) MINPT-O{OU 265.14 32.81 258.8 232.34 52.98 MAS =10.00 (m) 980.00 970.00 957.84 987.69 Min% 304.50 32.81 294.10 271.6 33.2a =10.00(m) 1500.00 1473.74 MINPT-O-EOU 763.26 61.95 721.59 701.3 18.8 DSF1.W 4320.00 3071.57 MInR-O-SF 627.83 66.89 782.99 76114 18.9 OSF1.W 4650.00 319426 MlnR-0SF 1358.71 122.46 1276.69 1236.25 1678 OSF1.50 7050.00 4086.52 MlnP1-O-SF 1496.97 102.59 1428.21 1394.39 22.1 OSF1.50 ]]20.00 4335.80 MhPt-0.SF 1582.67 106.99 1490.97 145589 22.1 OSF1.50 8040.00 4454.57 MInR-O-SF 1577.30 10].9] 1504.94 1469.33 22.1 OSF7.50 8110.00 4480.60 Ming -"F 1800.31 109.76 1526.77 100.56 22.08 OSF1.W W20.W 4521.49 WOR-OSF 2878.89 235.00 2]21.85 2643.89 184 OSF1.50 14520.W 6863.88 Ming-0.SF 2911.35 237.50 2752.64 267385 18,4 OSF1.50 146W.00 6923.15 MInR-O-SF 3025.87 242.45 286391 27834 18] OSF1.W 15200.00 7081.74 MInR-0 F 3087.19 289. 2893.8 2]9].3 16.03 OSF1.50 15530.69 7124.51 Ming-OSF 3102.30 290.98 2697.99 2811.32 160 OSF1.50 156W.27 7128.25 MinPls 3182.49 29].46 2963.86 2865.04 16.0 OSF1.50 16369.00 7113.36 MinR-O-SF 3208.91 305.9 3003.19 2901.82 15.81 OSF1.W 17690.00 6884.43 Ming-OSF 3210.69 292.36 3015.66 29185 16.52 OSF1.W 17120.00 8854.68 Ming-0SF 3217.10 284.71 3020.30 2922.39 1642 OSF1.50 17230.0 M7.89 Ming -O -SF 3221.79 294.46 3625.15 2927.33 1646 OSF1.60 17452.56 6713.25 MinPls TO H16A(P3)(Oef Plan) 238.13 32.81 236Z4 205.32 N/A MAS = 10.00 (m) 0.00 0.00 pass 238.13 32.61 236.84205.0 144]48.39 MAS = 10.00 (m) 35.25 35.25 Surface 237.31 32.81 234.95 204.50 219.92 MAS=10.00(m) 220.00 220.00 WRP 23].35 32.81 234.88 00.54 199.69 MAS=10.0 (m) 240.W 240.00 MWRIs 285.11 32.81 258.9 232.31 53.54 MAS=ID.W 9W.W MINK-O{OU 285.14 32.81 25B.88 232.30 52.99 (m) MAS =10.00 (m) 970.00 95].84 967.69 MinPls 304.50 32.81 284.10 2718122,12 MAS =10.00(m) 1500.00 14]3.]4 MINPT-0 EOU 763.28 61.95 72159 ]01.32 OSF1.W 4320.W 3071.57 Ming-OSF 827.83 88.69 782.99 761.1 OSF1.50 465080 3194.26 MInR-0-SF 1358.71 122.48 1276.89 123625 OSF1.50 7050.00 4088.52 Ming -"F 1496.97 102.% 1428.21 1394.3 OSF1.W 7720.00 4335.80 MInPI.O-SF 1562.6] 169.99 140.97 1455. OSFi.50 W40.W 4454.57 Ming -O -SF 1577.30 107.9] 1504.94 1469. OSF1.50 8110.00 4480.W Ming-0.SF 1600.31 109.76 1526.]7 140.5 OSF1.50 8220.00 4521.49 MmR-0SIF 2878.89 235.0 2721.85 2643.8 OSF1.50 14520.00 6863.66 MmR-0SF 2911.35 237.50 2752.64 2673.8 1847 OSF1.50 14880.69 6923.15 Ming -O -SF 302587 242.45 283.91 278342 1879 OSF1.50 152W.00 7081.74 Ming -O -SF 3087.19 289.8 2893.6 2797.36 16.0 OSF1.50 15530.00 7124.51 MmR-O-SF 290.98 2907.0 28113 16.0 OSF1.50 15880.2] 7128.25 WPM 3162.49 297.6 2963.86 2865. 16.00 OSF1.W 16300.69 7113.38 Ming-OSF 32W.91 W5.09 303.19 2901.82 15.81 OSF1.50 1]OW.W 6984.43 Ming-OSF 3210.90 292.36 W15.W 2918.5 16.5 DSF1.50 17120.00 %54.66 MInPI-O-SF 3217.10 294.71 3020.30 2922.3 16.0 OSF1.50 17230.00 8807.89 Ming -O -SF 3221.79 294.48 3025.15 2927.33 16.46 OSF1.W 17452.69 6713.25 mmft TD H16PB1(Def Survey) 236.13 32.81 236.64 205.32 NIA MAS =1000 (m) 0 0.60 Pass00 238.13 32.81 23684 205.32 144748.39 MAS =10.00 (m) 35.25 35.25 Surtace 237.31 32.81 234.95 204.W 219.92 MAS=t0.W(m) 220.W 220.00 RP 23735 32.811 234.Wj 204.54 189.69 MAS =10.00(m) 240.00 240.00 MWRls 265.11 32.81 258. 232.311 5354 MAS =10.00 (m) 980.00 MINPT-O-EOU 265.14 32.81258. 232.34 52.0 M]5 =10.00 (m) 970.00 957,84 987.69 Min% MINI T-0 EOU Schlumberger-PrWate Schlumberger -Private 304.5D 32.81 294.10 2718 33.2 MAS 10.00 (m) 1500.00 1473.74 MinPt-OSF 70.26 6200 721.56 7012 18.7 OSF1.W 4320.00 3071.57 MinPI-0-SF 827.0 66.73 782.96 761.0 18.90 OSF1.W 4650.0 3194.26 Ming-OSF 1358.71 122.52 12]6.65 1236.19 16.78 OSF1.50 7050.W 4086.52 MinPt-O-SF 1498.97 102.68 1428.14 139429 22.0 OSF1.50 7]20.00 4335.00 MmPt-OSF 1562.67 107.09 1490.0 1455.58 22.11 OSF1.50 0040.00 4454.57 MinPt-OSF 1577.30 108.08 1504.87 1469.22 22.11 OSF1.50 8110.0 4480.00 MinPt-O.SF 1600.31 109.87 1526.69 14W,45 22.0 OSF1.50 8220.00 4521.49 MhPt-0.SF 28]8.89 235.27 2]21.6] 2643.62 18. OSF1.50 14520.00 6863.66 MmR-O-SF 2911.35 23777 2752.48 26735 18.4 OSF1.50 14680.00 6923.15 MinR-O-SF 2989.86 248.6 2823.] 2741.1 18.1 OSF1.50 15000.00 7054,54 MlnPts 329.57 25070 2872.11 27M 86 OSF1.50 15660.27 7128.25 MlnPt-0SF 31148.18 251.10 28W.45 279708 OSF1.W 15850.00 7128.25 Ming -O -SF 3079.58 250.70 2912.12 2828.88 18.49 OSF1.50 16300.00 7113.36 Ming-OSF 3N0.87 249.05 2924.51 2841 82 OSF1.50 1645O.OD 7088.97 MinM-O-SF 3108.69 251.42940] 2857.27 F 18.61 OSF1.0 16840.00 692.86 Morift 3109.03 251.0 2940.]2 2857.06 18.58 OSF1.W 18910.00 6843.96 Min% 3120.57 2W.48 2953.26 2870,10[L__18.76 OSF1.W 17WO.W 6]]8.12 MinPt-OSF 312806 2W.28 2960.88 2877.78 18.82 OSF1.W 17452.56 6713.25 TD Starichkof State 1 (Def Survey) Pass 13221.03 32.81 13219.74 1318822 NIA MAS = 10.00 (m) 0.0 0.00 Surface 13220.75 32.81 13219.44 13187.94 446348.55 MAS =10.00 (m) 35.25 35.25 WRP 13220.4 32.81 13218.38 13187.66 16316.95 MAS =10.00 (m) 2W.00 25D.W MinPts 131034 32.81 13177.81 13167.53 1173] MAS = 10.00 (in) 910.00 08.51 MinPI-O-SF 13081.06 32.81 1303.91 13048.25 8266 MAS =10.00(m) 1380.00 1362.49 MInPI-O-SF 12815.07 37.17 12789.81 1277].9 53].91 OSF1.50 1980.00 18W.77 MinPI-O-SF 11404]4 49.45 11371.10 11355.2 3006 OSF1.W 3830.00 2889.41 MinR-OSF 9911.46 66.17 066.38 9645.2 235.2 OSF1.W 5WO.00 3547.4 Ming -O -SF 8728.83 81.11= 8647] 169.4 OSF1.W 7050.OD 4086.52 MlnPls 7498.68 W.29 7443.54 74184 148.02 OSF1.W 8640.0D 4677.64 MinR-O-SF 5559.93 126.05 5473.94 5433,87F---69.311 OSFi.50 11550.0 5759.50 MinPt-O-SF 4528.56 182.52 440.77 4346.04 3T.M OSF1.50 1420.W 6752.13 Ming-0.SF 43W.70 2W.81 4216.45 4149.8 32.6] OSF1.50 1570.00 7128.25 MiaP(-O.SF 4339.12 200.31 4205.21 4138.81 32.87 OSF1.50 1W70.W 7128.25 MinPt-O-SF 4330.0 10.97 4197.31 4131.03 32M OSF1.50 15970.00 ]128.25 MnR43-SF 4326.14 10.76 4192.W 4126.39 32.2 OSF1.50 IWW.O 7128.25 MnR-O-SF 430.98 10.59 4187.% 4121.39 32.65 OSF1.50 16180.00 7124.53 MmR-O-SF 4319.58 IN.57 4186.16 4120.01 32,64 OSF1.50 16240.00 7119.87 MmPt OSF 4318.59 199.48 4185.23 4119.111 32Adl OSF1.50 16300.00 7113.38 Min% 4318.29 196.591 4187.5211 4122.70 33.30 OSF1.5D 16330.00 71N.40 MINPTAEOU 4318.10 195.02 418).]1 4123.08 3340 MF1.5D 1630000 7101]8 MInR-CtCt 4404.20 180.34 428360 4223.86 36.85 OSF1.50 17452.56 671325 TD Cosmopolitan State 1 (Def Survey) Pa. 18223.16 32.81 18221.18 1819035 NIA MAS =10.00 (m) 0.00 000 Surface 18223.13 32.81 18221.15 181032 N/ MAS =10.00 (m) 20.00 2000. Ming-0SF 18223.12 32.81F= 18190.31 WA MAS=10.00(m) 30.00 30.00 MINPT-O-EOU 18223.12 32.81 18221.14 1810.31 NIA MAS =10.W(m) 35.25 35.25 WRP 18038.42 32.81 18029.76 18005.62 2]21.0 MAS -10.0(m) 150D.W 1473]4 MlaR-0.SF 13888.31 65.42 13643.1 13622.8 338.62 OSF1.W 70500 4006.52 MinPta 11002.49 MAO 10945.64 10920.8 222.10 OSF1.50 10410.0 5335.67 Ming -D -SF 8182.55 151.04 8078.61 8031.00 M] OSF1.50 14460.W 6841.36 MMR- SF N22.33 182.67 6797.40 6739. 59.8 OSF1.50 18300.00 7113.36 MlnR-O-SF 8100.12 10.20 W26.61 5965.92 0065 OSF1.50 17452.56 8713.25 MinPts Schlumberger -Private 0 a z m c v DI ueN st Energy Attachr Cosmopolitan Project H04-103 10401 Fishbone APD Attachments H04-1-03 10-401 Fishbone APD Attachments NOTE: The Rib Laterals in H04 are left as open hole completions after drilling, and as such, there are no casing design nor cement volume calculations to present in this section of the respective L01 through L07 Lateral APD's. lueNest Energy Attachment 4 Cosmopolitan Project H04-10310-401 Fishbone APD Attachments H04 -L03 10-401 Fishbone APD Attachments NOTE: The Rib Laterals in H04 are left as open hole completions after drilling, and as such, there are no FIT / LOT Procedures to present in this section of the respective L01 through L07 Lateral APD's. tlueC.iest Energy Attachmen Cosmopolitan Project H04-10310-401 Fishbone APD Attachments H04 -L03 10-401 Fishbone APD Attachments Iue(.iest Energy Cosmopolitan Project BOP & Choke Manifold Configuration 5K# WI H 10K# 49 3/32" 8070 FLANGE 0 0 a u X M 66 5/8" 0Ln o_ a- vo al Ln 27 3/4" to 41 11/16" 13 5/8"X10K# CAMERON BOP STACK BLUECREST ENERGY 13 5/8.90K CAMMN BOP S'T'ACK J01*iRBt tiff-UlE3f VYO - - - p8r 1 1 1/5116 UP Jw N✓WWGt I _ 6 I5 av u.c a r. NO. r.a 6$8(,7002 i 10-401 APD Attachments BOP & Choke Manifold Configuration lue st Eniigy Cosmopolitan Project BOP & Choke Manifold Configuration 10-401 APD Attachments BOP & Choke Manifold Configuration z . W W S II j$j$yy ¢ d b y t� Y tt is S n OW m✓y g O gW b O ac Y I � I m Z Y 1 x o � Z I � N w U a/I 0-, W O 2 1 l7 ry -rvn 10-401 APD Attachments BOP & Choke Manifold Configuration lue est Energy Diverter ' OPEI PORT W � O a CLOSING PORT G PLANGED Cosmopolitan Project BOP & Choke Manifold Configuration M AS CAST N K L ASCAST- +{ f E Nominal Dimensions—inches—with 2000 psi Bottom Connections A B CAST D E F G m J — K L M N (L P 5214. Hub 18 51 ., P m AS CAST 8Vis 4 45% 1 W% F so CLAMP HUB Nominal Dimensions—inches—with 2000 psi Bottom Connections A B C D E F G H J — K L M N O P 5214. Hub 18 51 ., 12)2 1 Hub 1 2315 6 7h 8Vis 27% 45% 5174 W% 5234 so 1% Hub 18 Hub 1 Soy: 5K Nominal Dimensions—inches—with 3000 psi Bottom Connections A B I C I D J E I F G H J K L M N O I P Hub 171 Flub 1 1 54% 5014 12%2 2315! 515914 W u 2735 45% 5135 58% 52% 50 1114 10-401 APD Attachments BOP & Choke Manifold Configuration toue(.iesr Energy Attachment 6: Cosmopolitan Project H04 -L03 10-401 Fishbone APD Attachments H04-1.0310-401 Fishbone APD Attachments 1ueC,iesr Energy Cosmopolitan Project Wellhead/Tree .-vsL sono g I 1 I I I I s Vu s;.lw Iv 65 w/VG+[SfAt aPFi 631• PM- usrc som vsi I VIS' S,OW ISI MSP ! u1L' S.�M'S. MSV _ i I AST S,Om PSI I L -- 9-SA'VACLWI -LT'tSG NLV I .cm r✓: 1 i� I I uas•sawn� - � MAMpIfL MAy4fN I 14% I i I li i i' ®Gl PI L 4« 111-rn-os.n191" s.st[I le f 11-119 r 1-516 r .-U) :e 3?Waw--- I i 014 ME IVENTI l IMU,'14 9 SR'CO CSGr +I I irr.:.= ri5Nl1.IM 112111' 0. 1- 10-401 APD Attachments Wellhead/Tree lue est Energy Attachment Cosmopolitan Project H04-1-0310-401 Fishbone APD Attachments H04 -L03 10.401 Fishbone APD Attachments NOTE: The Rib Laterals in H04 are to be drilled from an open hole mainbore below the 9- 5/8" casing shoe using the BlueCrest Rig 1 BOP stack and choke manifold for well control (no Diverter system applicable), and as such, there are no Diverter Schematics to present in this section of the respective L01 through L07 Lateral APD's. tSlueNest Energy Attachment 8: Cosmopolitan Project H04 -L03 10-401 Fishbone APD Attachments H04 -L03 10-401 Fishbone APD Attachments H04 and H04 -L03 with 1000' Radius Around Production Sect IL7T ADL384403 2e ns w_snH 11 Confidential SEC 28. T3S, Rt 5W. SM SFC 2/. T3S. R15W. SM H12 SEC 26. T35, Hansen 1A 1-104-1-03 Surface Location (NAD 27) Northing: 2,144,623.03', Easting 168,812.80' 217T FSL, 1552' FEL, Sec. 2, T4S, R15W SM Surface Casing Point Northing: 2,145,687.06', Easting 165,349.46' 3,143' FSL, 5,044' FEL, Sec. 2, T4S, R15W SM Kick Off Point Northing: 2,149,555.2T, Easting: 154,774.06' 1,433' FSL, 5,158' FEL, Sec. 33, T3S, R15W SM Total Depth Northing: 2,150,416.47', Easting: 153,496.35' 2,258' FSL, 1,177' FEL, Sec. 32, T3S, R15W SM SEC 4. TES. R15W SM Cosmopolitan Unit Development Date 26/09/2018 Conpany BlueCrest Energy T3S. R15W. SM ADL16790 SEC 3.T4S.R15W.5M 0 1000 2000 3000 4000 5000RUS 1:30000 SEG 1.T lueC.fest Energy Attachm Cosmopolitan Project 1-104-1,0310-401 Fishbone APD Attachments H04-10310-401 Fishbone APD Attachments NOTE: The 20" Conductor and Surface Slot Location as -built schematic for H04, to be prepared by Lounsbury Surveyors, will be provided to include in this APD package when the 20" is set and the as -built schematic is completed. lNest Energy Attachmen Cosmopolitan Project 1-104-1-0310-401 Fishbone APD Attachments H04-1.0310-401 Fishbone APD Attachments NOTE: The New Well Elevation Form for H04, to be prepared by SLB Directional Drillers, will be provided to include in this APD package when the BlueCrest Rig 1 is on the H04 well, actual elevation measurements can be taken, and the surface slot as -built schematic has been completed. TRANSMITTAL LETTER CH/EECKLIST WELL NAME: cLd�-GCS eiL� 7T3 a /Development PTD: V Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing ell Permit LATERAL No. % API No. 50-�-a (If last two digits Production sTiould continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements JJI'er Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool HANSEN, HANSEN UNDEF OIL -290100 _ Well Name: HANSEN H -04-L03 _ .. _ .Program DEV_ _ _ Well bore seg [! PTD#. 2181290 Company BLUECREST ALASKA_ OPERATING. LLC_ _.. Initial Class/Type DEV/PEND GeoArea 820 Unit 10370 On/Off Shore OnAnnular Disposal I_' Administration 17 Nonconven.. gas conforms to AS31.05.0300.1.A).0.2.A-D) NA 15 1 Permit fee attached _ _ NA. 16 2 Lease number appropriate Yes Surface Location lies within Fee -Hansen;. Portion of Well Passes Thm ADL0018790; 3 Unique well. name and number Yes TO lies in ADL0384403. 4 Well located in a. defined pool _ _ No Hansen Undefined Oil Pool 5 Well located proper distance from drilling unit. boundary Yes 21 6 Well located proper distance from other wells Yes HANSEN, HANSEN UNDEF OIL - 290100,governed bystatewide spacing regulations.. 7 Sufficient acreage available in drilling unit Yes As planned, this well conforms with statewide spacing requirements. 8 If deviated, is wellbore plat included _ Yes 24 9 Operator only affected party Yes 25 10 Operator has appropriate bond in force _ Yes 26 Appr Date 11 Permit. can be issued without conservation order Yes Well branch does not lie with same governmental quarter section as Hansen 1A. 12 Permit can be issued without administrative approval Yes 28 SFD 10/17/2018 Yes GLS 11/5/2018 29 H2S not observed in nearby Hansen wells. Rig has sensors and alarms. "J-shaped" well branch targets. Starichkof sand and Hemlock. Planned mud weights in conjunction. with Managed Pressure Drilling technique appear adequate. to control maximum anticipated downhole. pressures of 9.1 - 9.6 ppg, which are based on MDT measurements of reservoir pressure in nearby well. Geologic 13 Can permit be approved before 15 -day wait Yes 3rd OH lateral spoke to be drilled. 14 Well located within area and strata authorized by Injection Order# (put 10# in comments) (For NA. 'ssioner IASR 15 All wells. within 1/4. mile area of review identified (For service well only).. NA 16 Pre -produced injector; duration of pre -production less than 3 months (For service well only) NA 18 Conductor string. provided.. Yes Engineering 19 Surface casing. protects all known USDWs Yes 20 CMT vol. adequate. to circulate on conductor & surf csg Yes 21 CMT vol adequate. to tie-in long string to surf csg. No. 22 CMT will cover all known productive horizons Yes 23 Casing designs adequate for C, T, B &. permafrost Yes 24 Adequate tankage or reserve pit Yes 25 If a re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes 27 If diverter required, does it meet regulations NA Appr Date 28 Drilling fluid program schematic & equip list adequate Yes GLS 11/5/2018 29 BOPEs,.do they meet. regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes 31 Choke manifold complies w/API. RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable No 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen. sulfide measures Yes Geology 36 Data presented on potential overpressure zones Yes Appr Date 37 Seismic analysis of shallow gas zones NA SFD 10/17/2018 38 Seabed condition survey (if off -shore) NA 39 Contact name/phone for weekly. progress reports [exploratory only] NA H2S not observed in nearby Hansen wells. Rig has sensors and alarms. "J-shaped" well branch targets. Starichkof sand and Hemlock. Planned mud weights in conjunction. with Managed Pressure Drilling technique appear adequate. to control maximum anticipated downhole. pressures of 9.1 - 9.6 ppg, which are based on MDT measurements of reservoir pressure in nearby well. Geologic Engineering Public 3rd OH lateral spoke to be drilled. Commissioner: 1)rs Date: yCoissioner// Date c�°r�:9�-�-r/17��f 'ssioner IASR Date Ik-l I(r1Y/, 't