Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout218-130DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2181300 Well Name/No. HANSEN H-04-1-04 Operator Bluecrest Alaska Operating LLC API No. 50-231-20064-63-00 MD 20094 TVD 6596 Completion Date 3//22/2019 Completion Status 1-0I1- Current Status 1-0I1- UIC No REQUIRED INFORMATION 64 /Vj J� Dp Lt Mud Log Alo Samples l� Of Directional Survey Yes J DATA INFORMATION List of Logs Obtained: GR/Res/DEN/Neu/PWD/ M.rdl Qc S (from Master Well Data/Logs) Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval OH/ Type Med/Frmt Number Name Scale Media No Start Stop CH Received Comments ED C 30743 Digital Data 17600 20150 5/13/2019 Electronic Data Set, Filename:H04� YY'. J(u6 ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-03-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-04-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-05-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-06-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-07-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-08-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-09-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: Hansen H04 Nabors AM Report 02-10-2019.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: H04-1-04.dbf ED C 30743 Digital Data 5/13/2019 Electronic File: h04-104.hdr ED C 30743 Digital Data 5/13/2019 Electronic File: H04-L04.mdx ED C 30743 Digital Data 5/13/2019 Electronic File: h04-LO4r.dbf ED C 30743 Digital Data 5/13/2019 Electronic File: h04-LO4r.mdx ED C 30743 Digital Data 5/13/2019 Electronic File: 1-104-104_SCL.DBF ED C 30743 Digital Data 5/13/2019 Electronic File: H04-L04_SCL.MDX AOGCC Pagc I of4 Monday„ July 1, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to ONII 2181300 Well Name/No. HANSEN H-04-1-04 Operator Bluecrest Alaska Operating LLC API No. 50-231-20064-63-00 MD 20094 TVD 6596 Completion Date 3/22/2019 Completion Status 1-0I1- Current Status 1-OfL UIC No ED C 30743 Digital Data 5/13/2019 Electronic File: H04-L04_tvd.dbf ED C 30743 Digital Data 5/13/2019 Electronic File: H04-L04_tvd.mdx ED C 30743 Digital Data 5/13/2019 Electronic File: BLUE CREST ENERGY H-04 FINAL REPORT.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: 1104-L04 - Drilling Dynamics Log MD.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 - Formation Log MD.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 - Gas Ratio Log MD.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 - LW D Combo Log MD.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: 1104-1-04 - Drilling Dynamics Log MD.tif ED C 30743 Digital Data 5/13/2019 Electronic File: H04-1-04 - Formation Log MD.tif ED C 30743 Digital Data 5/13/2019 Electronic File: 1104-L04 - Gas Ratio Log MD.tif ED C 30743 Digital Data 5/13/2019 Electronic File: 1104-1-04 - LWD Combo Log MD.tif ED C 30743 Digital Data 5/13/2019 Electronic File: 1104-1-04 Show Report #1 18440- 18850.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: 1104-1-04 Show Report #1 18440- 18850.x1sm ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 Show Report #2 18870- 19100.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 Show Report #2 18870- 19100.xlsm ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 Show Report #3 19384- 19900.pdf ED C 30743 Digital Data 5/13/2019 Electronic File: H04 -L04 Show Report #3 19384- 19900.xlsm Log C 30743 Log Header Scans 0 0 2181300 HANSEN H-04-1-04 LOG HEADERS ED C 30912 Digital Data 17634 20068 6/21/2019 Electronic Data Set, Filename: BlueCrest_H04- L04_EcoScope Images_RM_LAS.las ED C 30912 Digital Data 17608 20104 6/21/2019 Electronic Data Set, Filename: BlueCresl_1104- L04_EcoScope_ RM_LAS.Ias ED C 30912 Digital Data 6/21/2019 Electronic File: BlueCrest_H04-L04_EcoScope Images_RM_OLIS.dlis AOGC(' Page 2 of 4 Monday, July 1, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2181300 Well Name/No. HANSEN H-04-1-04 MD 20094 TVD 6596 Completion Date 3/22/2019 ED C 30912 Digital Data ED C 30912 Digital Data ED C 30912 Digital Data ED C 30912 Digital Data ED C 30912 Digital Data ED C 30912 Digital Data Operator Bluecrest Alaska Operating LLC API No. 50-231-20064-63-00 Completion Status 1 -OIL ED C 30912 Digital Data ED C 30912 Digital Data Log C 30912 Log Header Scans 0 0 ED C 30912 Digital Data 0 0 ED C 30912 Digital Data 0 0 Well Cores/Samples Information: Name Cuttings INFORMATION RECEIVED Completion Report DY Production Test Informatior /Y / NA Geologic Markers/Tops YO COMPLIANCE HISTORY Completion Date: 3/22/2019 Current Status 1 -OIL UIC No 6/21/2019 Electronic File: BlueCrest_H04- Mechanical Integrity Test Information Y / NA L04_ EcoScope_RM_DL IS.dlis 6/21/2019 Electronic File: BlueCrest_H04- Cuttings Samples (D NA L04_ EcoSoope_2in_RM_17690-20094ftMD. Pdf 6/21/2019 Electronic File: BlueCrest_H04- L04_EcoScope_2in_RM_I nvertTVD. Pdf 621/2019 Electronic File: BlueCrest_H04- L04_EcoScope_Sin _RM_17690-20094ftMO. Pdf 6/21/2019 Electronic File: BlueCrest_H04- L04_EcoScope_Sin _RM_I nvertTVD. Pdf 621/2019 Electronic File: BlueCrest_H04- L04_EcoSoope_Image _5in_RM_17690- 20094ftMO.Pdf 621/2019 Electronic File: H04-1-04_Surveys to surface_final.pdf 6/21/2019 Electronic File: 1-104-1-04_Surveys to surface_final.xlsx 2181300 HANSEN H-04-1-04 LOG HEADERS 1-104-1-04 ASP Final Survey PDF 1-104-1-04 ASP Final Survey Excel Interval Start Stop Sent Received 18440 20094 3/26/2019 Sample Set Number Comments 1707 Directional / Inclination Data�Y Mud Logs, Image Files, Digital Data�N Core Chips Y / Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files OY Core Photographs Y / A� Daily Operations Summary 0Y Cuttings Samples (D NA Laboratory Analyses YO -NA ) AOGCC Page 3 of Monday, July 1, 2019 DATA SUBMITTAL COMPLIANCE REPORT 7/1/2019 Permit to Drill 2161300 Well Name/No. HANSEN H-04-1-04 Operator Bluecrest Alaska Operating LLC API No. 50-231-20064-63.00 MD 20094 TVD 6596 Completion Date 3/22/2019 Completion Status 1-0I1- Current Status 1-0I1 UIC No Release Date: 11/19/2018 Description Date Comments Comments: Compliance Reviewed By: Date: '� � I / I q AO(i('(' Page of Monday, July I, 2019 3 1 0 1 9 1 1 1 2 1 J LIN 2 G 218130 30912 21 8130 30 74 3 lueC.fest Energy BlueCrest Alaska Operating LLC 3301 C Street, Suite 202 Anchorage, AK 99503 Tel: (907) 754-9550 " ,r ^ -r@ E i Fax: (907) 677-0204 ' "� �. MAY 10 2019 Transmittal AOGCC Today's Date 5/10/2019 Final Well Data for Well Transmittal #: 2019-08 To. Ms Meredith Guhl H04 L02 From: Andrew Buchanan _ ._..._— Company: I AOGCC Re: Final Well Data -- Final Well Data for Well ..... .... ............ ..........- Company: BlueCrest Alaska Operating LLC Well: H04 CD's contain the Final Well Data for H04: Final Well Data for Well H04 Main Final Well Data for Well H04 L01 Final Well Data for Well H04 L02 Final Well Data for Well H04 L03 Final Well Data for Well H04 L04 Final Well Data for Well H04 L05 Final Well Data for Well H04 L06 Final Well Data for Well H04 L07 Regards Andrew Buchanan BlueCrest Energy STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION RECEIVED MAY 0 9 2019 WELL COMPLETION OR RECOMPLETION REPORT ANDA0(jCC 1a. Well Status: Oil Q Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Q Exploratory El GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry: BlueCrest Alaska Operating LLC Comp: 3/22/2019 218-130 3. Address: 7. Date Spudded: 15. API Number: 3301 "C" Street, Suite 202, Anchorage, AK 99503 12/27/2018 50.231-2006483.00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 2069' FSL, 1541' FEL, Sec 2, T4S, R15W, SM 2/12/2019 L04 H04 L04 Top of Productive Interval: 9. Ref Elevations: KB: 180.5 • 17. Field / Pool(s): 1868' FSL, 580' FEL, Sec 32, T3S, R15W, SM GL:145.8 V_. 141.4 Hansen,Undefined Cosmopolitan Oil Total Depth: 18. Property Designation: � - 10. Plug Back Depth MD/TVD: 2696' FSL, 1895' FEL, Sec 32, T3S, R15W, SM 20094' MD / 6596' TVD Fee Hansen,AD1_18790,ADL 384403 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 168804 y- 2144597.65 Zone- 4 20094' MD / 6596' TVD LOCI 14-007 TPI: x- 154082.59 y- 2150009.61 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- 152790.62 y- 2150874.58 Zone- 4 488' MD / 488' TVD N/A 5. Directional or Inclination Survey: Yes L4J (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A ift MSL) 1 18,440' MD 17125' TVD KOP L04 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary ALL LOGS WERE SLB LWD: GR-Res--Den-Neu-PWD Final Mudlogging Report / Mud Log / Lithology Log (Nabors-CanRig) Formation Log / LWD Combo Log / Gas Ratio Log / Drilling Dynamics Log 23. CASING, LINER AND CEMENTING RECORD WT. PER SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT GRADE TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 20 0.500" wall A525 41 115.5 41 115.5 Driven N/A - Rotary Drilled/Driven WA 13.375 72 L-80 40.5 5800 40.5 3593 17.5" 787 bbls Lead 1176 bbls Tail N/A 9.625 47 P-110 37.8 15406 37.8 7055 12.25" 139 bbls 15.8 ppg G -Tail N/A 4.5 15.2 P-110 15211 20864 6988 7127 8.5" Slotted Liner - no cement N/A 3.5 9.3 L80 10.61 15246 10.61 6988 N/A Production Tubing String N/A 24. Open to production or injection? Yes Q N0 ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3.5" 15246' MD 15211' MD / 6988' TVD Well completed with 4-1/2" slotted liner in mainbore; see attached lower liner tally for set depths and details. There are no perforations since a slotted liner was run in the well. L04 is completed as a barefoot lateral with KOP of 18440' , MD (7125' TVD) and TD of 20094' MD (6596' TVD). Production from fishbone 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes LJ No laterals drains into slotted liner in mainbore. COMPLETION; Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED D 7 2 N/A N/A VERIFIED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): 3/25/2019 as lifted 3/25/2019 Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 12 hours ITest Period 1,206 & OL( 609000 1'b I W 8 37 500 Flow Tubing Press. Casing Press: 1575 Calculated 24 -Hour Rate Oil -Bbl: 1200 1600M Gas -MCF: Water -Bbl: 15 Oil Gravity - API (torr): 27 Form 10407 Revised 5/2017,��0 Alr^MCONTINUED ON PAGE 2 RBDMSJ.L- N1AY 0 9 2019 Submit ORIGINIAL only i 9 / •f -h -i �l 28. CORE DATA Conventional Co,s): Yes ❑ No Q Sidewall Cores: les ❑ No Q If Yes, list formations and intervals cored (MD/TVD, From/ro), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. N/A 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑v If yes, list intervals and formations tested, briefly summarizing test results. Hemlock 19146 6981 Starichkof 19922 6666 Attach separate pages to this form, if needed, and submit detailed test information, including reports, per 20 AAC 25.071. TPI (matches 4a & 4b) 18,440 7,125 BPI (TD) 20,094 6,596 Formation at total depth: lHernlock 31. List of Attachments: Operations Summary, Actual Wellbore Diagram, List of Formation Tops, Mud Wt vs. Depth Data, Final Definitive Directional Surveys, Slotted Liner String Tally (4-1/2"), Tubing String Tally (3-1/2"), Wellhead & Tree Schematic, Pressure Test Results Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Andrew Buchanan Contact Name: Tom McKay Authorized Title: Vice President Ala a Operations Contact Email: tom.mckavabluecrestenerov com AuthorizedQ Contact Phone: 907-754-9566 Signature: �- ! ate: `— INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Forth 10-407 Revised 5/2017 Submit ORIGINAL Only lust Energy 3301 C Street, Suite 202, Anchorage, AK 99503 Thomas McKay, PE Phone: (907)754-9566 Email: tom.mckay@bluecrestenergy.com April 9, 2019 Alaska Oil and Gas Conservation Commission 333 West 7th Avenue, Suite 100 Anchorage, Alaska 99501 Cosmopolitan Project RE: Well Completion Report Form 10-407: Horizontal / Multilateral "Fishbone" Production Well H04 Rev 1 Lateral L04 PTD No. 218-130 API No. 50-231-20064-63-00 Dear Commissioners, BlueCrest Alaska Operating LLC hereby submits a completed Form 10-407 Well Completion Report with Attachments for the onshore horizontal / multilateral production well H04 Rev 1 Lateral L04. This well was drilled and completed using BlueCrest Rig #1. The well is currently undergoing an extended flow test on gas lift after installing the 4-1/2" slotted liner completion. Note that the flow test results, etc., as per AOGCC request, will be covered under a subsequent 10-407 package, along with other required well production tests and reports. Please find attached for the review of the Commission, the completed Form 10-407, and the information required by 20 ACC 25.070 for this wellbore, covering the drilling and completion of the "fishbone" multilateral, and the running of the upper 3-1/2" tubing string. If you have any questions or require further information, please do not hesitate to contact Tom McKay at 907-754-9566 (office phone). Sincerely, l� Larry Burgess Alaska Manager BlueCrest Energy Alaska I!ue rNest Energy H04 Rev 1 — Lateral L04 Form 10-407 Well Completion Report List of Attachments Cosmopolitan Project AOGCC Item No. Description A Cover Letter w/ Attachment Headers 1 AOGCC Form 10-407 Well Completion Report (2 pages) 2 Operations Summary (Daily Running Summary / Recap) 3 Actual Wellbore Schematic (as Completed) 4 Detailed List of Formation Tops / Geologic Markers (Box 29) 5 Mud Weight vs Depth Data 6 Definitive Wellbore Survey (Directional Survey) H-04 As Built Schematic 4-3-2019 Auxin 26" Hole ---'"a 20" 0.50" Wall A252 Conductor @ +/-187' MD I TVD SCSSV (01488' MD Rig 1 RKS: 34.65' H -16A Elevation: 145.8' KB to MSL: 180.46' 17'/2" Hole , 133/8" 72# LAO BTC Casing @ +I-4195' MD - 3-%" 9.31f LA0 Tubing GLM 3 wl IPO Valve @ 4,696' MD, 3,197' TVD Jl Nlpple2@ 5,097'MD,3,340'WD GLM 2 w/ IPO Valve @ 10.661' MD, 5.346' TVD 12-'/." Hole L-01 L-02 Lln Lo< L -os NOP 1e,O W'MO KOP 19,9ee'MO 9-5/8"53.5#P-110 Casing TOP I7,BBP MO KOP 19,d 'MO L.03 KOP 10.230'MO KOP 20.038' MD TO 1T,200'MD TO 1.$M'MIT TO 19A17'Me TD N.090'MO TO 20,735 -MD KOP 20,820- MD @ 15,406 MD +l- 7,0TVD TD 21358'MD TD 21,21.906-MI)/55' 1 @ 1 1 14p5IMDe 6'6,717'rvD y i y y Tit zo.M Me 1 y MID _ 11 _ Flex Joint .... ..a� ' Rexmbly mbly DON Chemical IDlecOon Sub @ 13,596' MD,6,409' TVD Locator Seal AssemblyI @ 15,207' No GLM 1 wl Valve MD, 6,65OrM6. @ 1d,288' MD, 6,656'TVD SGM vat OH Gauge@ 8 ill" Hole 15,116' MD, 6,952' TVD 4'/" 15.2# LA0 TSH -563 Slotted I Blank Liner Prepares D. Ross 4-3-1-1 9 T. McKay, 22March2019 H04 Lower Lateral ACTUAL Completion with Slotted liner in 20" Conductor to beset @82' Mainbore and Seven (7) Open Hole BGL Fishbone Ribs Ilu 'Ne Energy 13-3/8" 72# L80 BTC @ 5800' MD 3-Y4" 9.3# IBT-MOD Production Tubing 4-%" x 9-5/8" Liner Hanger & Liner Top Packer 9-S/8" 47.0# P110 H563 @ 15406' MD Fishbone ribs are 8-%" open holes spaced approx every 800' with 4-Y4" slotted liner run in the mainbore after the seven ribs were drilled; ribs were drilled in order from L01 to L07 using open hole sidetracks to initiate each rib; ribs penetrate all layers of Starichkof and Hemlock pay sands L01 L02 L03 L04 L05 L06 L07 4-Yz" 15.2# H563 Slotted Liner @ 20867' MD H-04 Formation Tops SSTVD MD TVD H-04 Add -180.5' Beluga -1978.18 2330 2158.68 Upper Tyonek A -3308.35 5510 3488.85 Lower Tyonek -6020.31 130241 6200.81 Starichkof -6853.97 15342 7034.47 Hemlock -6945.3 16786 7125.8 H-04-1-01 Starichkof -6631.02 17158 6811.52 H-04-1-02 Hemlock -6904.77 17179 7085.27 Starichkof -6544.78 18186 6725.28 H-04-1-03 Hemlock -6832.52 18287 7013.02 H -04-L04 Hemlock -6800.62 19146 6981.12 Starichkof -6485.96 19922 6666.46 H-04-1-05 Hemlock -6791.27 20028 6971.77 Starichkof -6510.86 20697 6691.36 H-04-1-06 Hemlock -6823.52 20671 7004.02 Starichkof -6569.83 21320 6750.33 H-04-1-07 Hemlock -6885.62 213081 7066.12 Starichkof -6651.92 219321 6832.42 WeliView Well Name: HO4 BC - Daily Recap Dally Operations Rpta filen Deb EMbem summary 38.0 1202019 1/21/2019 - Back ream out of hole F111,219' TI 8,400' as per K&M instructions . 1000Igpm - 3500/pai - RPm1140 - Max gas 285 units - 110-150 back ground gas - Bad( ream one stand slowly to allow shakers to dean up FI 6,400' T 8,310'- Continue back reaming F/ 8.310; T/ 6,700' as per D&M instructions - 1000/gpm - 3250/psi - RPMI140 - 12kttorque - ECD 11.06 - Max gas 183 units - Started packing off @ 6,633'- Slacked off to 6,702'and worked pipe @ 2 FVMin until shakers cleaned up - Bad( reamed out of hole F/6,612' T/ 5.920'(M 5 -15 Ft/Mki as hole dictated - 1000/gpm - 4250/pal - RPM/140 - 7-10krrorque - String Wt 150k - Max gas 183 units - ECD 10.91 ppg - Stopped C 6,920' and look strings Wis. P/U Wt 17Dk - 510 Wt 130k - Rot Wt 150k - Began pulling BHA through shoe @ 100/gpm & 180Ipsl F15,92D' T/ 6,818'- Hole packed off with 20k overflAl and pressured up to 570 psi - Stopped pump and slacked string to 5,950'- Circulated and reciprocated pipe F/5,950' T/5,910 @ 1000/gpm - 2800/psi - Pulled BHA into casing F/6,910' T/ 5,778' no problems - -- - Perfomled dean up cycles 390 1212019 1222019 - Performed dean up cycle, rad( back one stand each bottoms up to 5,305' - 1000 gpm - 2750 psi - 120 RPM - 8k Torque - Flow checked 15 minutes - Blew doom mud line and top drive - FI trip tank - Clean rig floor - Cut and slip IVY of drilling line - Monitor well on Trip tank - 12 bb./hr losses -Service rig -Pumped dry job, blow down lines and TO - POOH on elevators F/ 5305' T/ 3,863'- Observedl0k overpull and trending upwards to 20k ® 3,900'- Make up top drive and RIH to 3,995'- upon establishing circulation,observed padkoff - Worked pipe and established full circulation and rotary - Reamed into hole TI 4,182' - Bad( reamed out of hole Ff 4,182'T/ 1,837'@ 20 Ft/Min as per K&M instructions - 1000 gpm - 1800 psi - RPM 120 - String Wt 130k - Circulate and reciprocate pipe F/ 1,837' T/ 1,746'a 5 Ft/Min - 1000 gpm - 2000 psi -120 RPM - 4k Torque - Circulated bottoms up x 6 - Back reamed FI 1,746' T/995' @ 20 FVMIn 1000 gpm -1800 psi - RPM 120 - POOH on elevators to 340'- PJSM - Lay down BHA with crane assist - Monitor wag on trip tank 40.0 1222019 1232019 - Lay down BHA with crane assist - Geer floor of all BHA tools and equipment - Bring casing tools and equipment to rig floor with crane - Mondor well on Trip tank - Drain stack, dosed Winds and changed top rams to 9 518", changed wash pipe to Chevron style - Monitored well on Trip tank - Make up test joint, xo, and wear bushing running tool and retrieved wear bushing - Set test plug, filled stack and lines with water and tested rams 205!3500 for 5 minutes - Rigged down test equipment, removed test joint and plug - Changed out drilling bales and elevators to casing bales and elevators - Safety meeting with crews - Run 9 518" casing with Volant tool - Tenans inspecting threads and GBR confirming torque with torque graph - Flling pipe on the fly and topping off every 20 joints 41.0 123/2019 1242019 Run 9.625" 47# P110 HYD 563 casing. From joint #62 to # 256. ruling each joint, top off every 20 joints. Good metal displacement. 42.0 124/2019 1252019 Run 9.625" 479 P110 HYD 663 casing. From joint #266 to # 338. Filling each joint, top off every 20 joints. Good metal displacement. Land hanger on depth. Shoe a 15405'. Circulate and condition mud system, wellbore. Rig up cementers. MU plug launcher and hardline, SLB loaded Imes with 5 bola water and checked for leaks. SLB pressure tested Ines at 300 low 3500 high, good tests. Dropped first plug. Rig pumped 98 bbis 13 ppg MudPush II at 4 bpm and shut down. SLB dropped 2nd bottom plug and pumped 139.3 bbis (678 sx) 15.8 ppg Class G cement at 3.5 bpm.SLB dropped top plug, then displaced with 10 bbis water. The rig pumped 10 BBLS 13 ppg MP2 with no fiber @ 4 BPM 400 psi, followed by 1105 BELS 10.5 PPG OBM. Slowed to 3 bpm with 40 bbl to go. (Rig pumped 12.068 strokes) Pumped half the shoe track. Did not bump the plug. Held 400 psi (FCP of 580 ps0 for 6 minutes, bled off and floats held. Bled back 114 DDI Into trash can on ng floor. Mit( water temp at 70 deg. Pumped 50% excess . Did not attempt to reciprocate the smng.CIP at 21:54 hrs, 01-24.2019. RD and released Schlumberger. 43.0 125/2019 1(262019 Lay down landing joint. Change out casing bales and elevators to diiIIIng bales and elevators. PfU a stand, make up running tool to pack off. Set pack off in well head prone. LLOS. Test to 5000, 10 mins. good. Strap & tally 210 JTS 5" XT50 DP with pre-instaled W WT super sliders, pick up via mousehole and stand back. Cleaning pits, transfer 891 BELS 10.5 ppg OBM to mud plant for centrifuging and storage in uprights 14,16,21). Change out casing rams to VBR's In upper pipe ram. 440 1;26/2019 1;27/2019 Change out top pipe rams to VBR's (3.5" x 5.5"). Change out washpipe on top drive from Chevron style to Mechanical. Clean pits in active system and reserve module. Rig up to test DOPE. Test with State witness. One faiVpass. miscellaneous sensor went flat. Rig down test equipment. PJSM: P/U BHA#5 with Cruz crane assist. 450 1/272019 1/2812019 TIH with BHA#5 to 2530' MD. Test MWD tools. TIH to 8765' MD. crew change. TIH to 15209. Tag up on cement stringers. Stage pumps up to 465 GPM, 2400 PSI. Ream down to 15283'. One joint above float collar. Circulate and condition to achieve even MW infout. Rig up test casing to 3500 PSI. 30 mins. Charted. Begin drilling shoe track. 46.0 1/2812019 1129/2019 rill shoe track, and clean out to TO of 12Y.." hole. 15420'. CBU. Clean pits 1,5. Displace out 10.5 ppg OBM with 9.4 ppg MOBM. Clean pits, build volume. Drill 20 feet of thew hole. CBU. Perform FtT to 13.5 PPG EMW. Build volume. 47.0 2 2 9 1 1 Buildvolume of 9.4 ppg CGC03. Build base mud in Mud plant, ship to reserve module, add Megamul emulsifier, w ' up to 9.4 ppg, ship 280 BBLs to active. Fill shaker pits. Drill 8h" hole from 15440'to 16.828'M 1_01 48.0 1/30 2019 wirecuonal ofillpro u on hole L01 from 18,828' to 17,200. BROOK Install 48 NRDPP on stands 166 to 181. Open hole etrack 1_01 back Into Mother bore Q 16,060' drill 90" tangent to 16,455' MD. 49. 1/312019 2 12 19 rediona ril L nom 1 ,455' to 8, . 5 5 , 2700 PP, 25k TO, 160 RPM, 280k Up Wt, 120k Dn Wt, 200k Rot , 1.9 ECD, 9.5 PPG M. www.peloton.com Page 6110 Report Printed: 312012019 WeIIView Well Name: H04 BC - Daily Recap Daly Oparationa RIx4 www.pelotori Page 8/10 Report Printed: 312012019 SW DOW End cafe Slxnmar 019 H to 16840. ren m 1 to m 0'to 7620'. in n m L03 17 0. Drill L03 to 17,957' MD. 2122019 2/312019 D rectional drill SW hoe with rotary steerablesystem from 17957' to 19,017'. Lost 15 BBLS in 4 mina, 225 BPH. Slowed pumps down. Staged pumps back to 400 GPM. 25 BPH loss rate. Pump 50 BBLS LCM, 30#/BBL, slowed losses to 12 BPH. BROOH to 18,625'. Placing NRDPP on each stand coming out 213201 B 4 0 9 Service Rig. BROOH from 18625' to 17,310' MD. Repair lop drive, cylinder on compensator. Pumping 350 GPM, well static. Complete repairjDb. BROOH from 17,310'to 15,354' MD. Inside casing. 2 412018 2/52018 BR H m 15354'to 14848'. Attemnpt to pull on elevators m 14849 to 14655, dreg increased 35k, would not break over. Continue BROOH from 14,655'to 8100' MD. Good hole fill. Well static. Some of the XT54 will have to be laid down. 2/5/2019 2/812019 BROOH from 8100' to 7081'. POOH on elevators to the BHA. Lay down BHA with crane assist. Gear and clean rig floor, adjust Baylor brake, hang two SLR's in derrick. TIH w/ 25 aids. 5" DP, Prepare to come out side ways. Wom hard banding. '0 2162019 2172019 - PJSM - Lay down 5" DP - assist W WT with removal of NRDPPs on each joint, clean each Joint with passing of sponge ball with Magtec Vac assist - Repair alignment of pipe skate and beaver slide with shims - Lay down 5" DP(total 75 jnts), Monitor well on trip tank - Remove XOs from TD, change Inserts on elevators to 5.5" - RIH with 51 stands of 5.5" DP - Service Rig - POOH laying down 153 joints of 5.5" DP deaning pipe in pipe shed with sponge ball with Magtec Vac Truck assist - RIH with 41 Stands 5.5" DP from derrick - POOH 11 Stands inspecting with Premium - Continue POOH laying down 5.5" DP and cleaning in pipe shed with sponge and Magtec Vac Truck assistance 56 0 2/712019 2/812019 - PJSM - POOH and layed down 71 joints of 5.5" XT -54 DP(total 249 XT -54 ). - Washed each joint In mouse hole and cleaned Inside of joints with sponge ball using Magtec Vac Truck In pipe shed - Cleared rig floor - Prepared test tools, removed wear bushing, and installed test plug - Tested ROPE with 5" & 5.5" DP 250/3500 psi low/high for 5 minutes - Performed accumulator draw down test and check Nitrogen x 6 bottles Q 2400 psi - Removed test plug and installed wear bushing, layed down test equipment - Placed tree Into cellar with crane - PJSM with crane am and picked up BHA #6 to 161'- Cleaned rig floor and readied tools for picking up 5" XT -50 DP - RIH picking up (75) joints of 5" XT -50 DP to 2.530' monitoring well on trip tank - Fliled pipe every 20 stands - ( Performed shallow test with Directional tools @ 1,774', good test) - Serviced rig - RIH with 5" XT -50 DP from derrick removing NRDPPs to 2,721' monitoring well on Trip tank 57.0 2/812019 2/9/2019 - PJSM - RIH with 5" XTSO DP from derrick removing all NRDPPs from each stand / 2,721 16,800', monitoring displacement on trip tank and filling every 20 stands - Service Rig - C/O elevator Inserts to 5.5" and RIH picking up 5.5" HT -55 DP from pipe shed F16,800' T/ 13,624', drifting each joint - Monitor well on trip tank and filling pipe every 20 stands ( NRDPPa were installed before picking up DP on pipe rocks and pipe shed as per pre -job plan of placement depths ) - RIH picking up (36) joints of5.5" XT -54 FI 13,624'T/ 14,755' monitoring well on trip tank - Fill pipe every 20 stands - RIH with 5.5" XT -54 DP from derrick FI 14,755'T/ 15,315 monitoring displacement on trip tank - Circulate and condition until Mud Wt Inlout the same, 9.5 ppg - Hang blocks - Slip and cul drilling line 58.0 2/912019 2/1012019 . Repaired hydraulic line cutter- Monitored well on trip tank - Cut and slipped 100' of drilling line - Tightened deadman damp, installed drawworks guard, installed SLM hook load sensor - Calibrated Rigminder block height and observed starting wrap on drum was not properly seated - Unpooled wraps on drum and respooled OK - Calibrated Rigminder block height and SLM hook load sensor - Monitored well on trip tank - Performed Mad Pass and confirmed depth correlation to be correct and all smart tools func0oning properly - RIH F/ 15,472' TI 17,570'- Filled pipe every 10 stands - SOW 135k - Circulated and conditioned mud while reciprocating and rotating pipe F/ 17,570'11 17,650' with 400/gpm - 1900Ipsi - 22-28k torque - Trenching Fl 17,670 T/ 17,690'- Kick off and time drilling F/ 17,690'T/ 17,716'- Drilling L04 FI 17.716'T/ 17,866 as per DO parameters 590 2/102019 2111/2019 - Drillin 117,865 TI 19,635' as per Directional Driller and K&M parameters - 160/RPM - 470/440/gpm - 230022 si - WOB/1025k - 24-26ktTorque - P/U Wt 31 Ok - S/O Wt 135k - Rot Wl 21 Ok ECD 11.68 ppg - Max gas 255 units Take SCRs every 5DO' drifted, serviced rig while performing SCRs 60.0 2/1112019 2/12/2019 - Drilled L04 F/ 19,635 20,094- as per Directional Driller It K&M parameters with 45 gpm - 21 00/p - WOBH 0-12k -160/RPM - 26krrorque - PN Wt 300k - Rot Wt 210k - ECD 11.65 ppg - Max gas 126 units - Pic ked up off bottom, stopped rotary, recycled pumps, and took final survey - BROOH F20,094' T/ 18,320' as per K&M parameters with 4301gpm - 2100/psl -160/RPM - 24k/Torque ( 5 it/min F/ 20,094'T/1 9,918' S 15 11/min F/ 19,918' T/ 18,320') - Reamed F/ 18,320' T/18,420' - Trenching F/ 18,420'T/ 18, 160/RPM - 24k/Torque - 450/gpm - 2150/psi - OAkN/OB - ECD 11.26 ppg - Time drilling for sidetre LAS ! 18,440'T/ 18,454' - continue drilling original hole F/ 18,454'T/ 18,550' as per DD & K&M parameters 160/RPM - 24 -28k/Torque - 450/gpm - 2150/psi-1523klWOB - ECD 11.44 EGD - PIU Wt 330k - S!O 135k - Rot Wt 218k 1.0 2!1212019 2/13/2019 - Drilled ahead in L05 F118,550' T/ 19,071' as per DD & K&M parameters -160/R M - 24-26 orque - 440/gpm - 2150/psi - WOB/10-15k - PN Wt 330k - S/O Wt 135k - Rot Wt 215k - ECD 11.55 - Max gas 200 units - Charged oil and filters in lube oil pump on Top Drive - Drilled F119,071' T/ 19,888' as per DO & K&M parameters - 180IRPM - 24-28k/Torque - 440/gpm - 2200/psi - WPB/1Q-15k - P!U Wt 310k - Rot Wt 215k - ECD 11.71 ppg - Max gas 258 units - Mud VA In 9.2 ppg - Mud Wt out 9.3 ppg ( The L05 build section started I IQ 19,197' wkh 3°1100' build rate) 62.0 2113/2019 2/142019 - Drilled LOS F/ 19,888'T/ 20,654" as per DD & K&M parameters - 180/RPM - 24-28k/Torque - 430/gpm - 2230/psi - WOB/10-15k - PN Wt 320k - ROT Wt 208k - Max gas 193 units - 11.60 - Changed lube oil pump discharge fitter- Drilled L05 F/ 20.664'T/ 20,735' (TD) as per DO & K&M parameters - 180/RPM - 26kfTorque - 4401gpm - 2250/psl - WOB/8-14k - P/U Wt 305k - Rot Wt 208k - ECD 11.84 ppg - Max gas 193 units - BROOH F120,735 TI 18,541' as per K&M parameters - RPW150. 24-26k/torque - 4401gpm - 2200/psi - ( Pulled T/ 19,44(Y Q 3 ft/Min & pulled T/ 19,541 ® 10 ft/Min) - Inspect NRDDPs while coming out of We www.pelotori Page 8/10 Report Printed: 312012019 WeliView° Well Name: HO4 BC - Daily Recap Dally Operations R" Sten Dare End Date summary 63.0 2/14/2019 21162019 - BROOH F/ 19,541 9,1 3 as per K&M parameters -14D.150/RPM - 28krrorque - 440/gpm - 2 00/psi - Rolating P/U Wt 200k - Adding 8.0 ppg pre mix mud Into system to maintain 9.2 ppg - Blow down TO and rig up to circulate Q 200/gpm with FOSV & side entry sub - Remove wash pipe and change out upper quill seals, change oil and fitters and install new wash pipe - R/D circulating assembly, establish circulation and rotary, work pipe 60' - RAl circulating assembly and circulate Q 200/gpm - Change out saver sub - Rig Service - R/ circulating assembly 64. 2/15/2019 2l1 2019 - Ddlling O6 / 19,513' 1120,855' as per DID & K M parameters - 170-1901RPM - 24-28krrorque - 440. 450/gpm- 425/psi - WOB - 10-15k - P/U Wt 330k - Rot Wt 205k - ECD 11.76 ppg - Max gas 181 units - Took SCRs every 500' 65.0 2/16/2019 211712019 - Drilla LOB F/ 20,855'T/ 21,358' (TD) as per DO & K&M parameters 0 RPM/190 - 26krrorque - 450/gpm - 2445/psl - WOBI10-15k - P/U Wt 325k - Rot Wt 210k - ECD 12.8 ppg - Max gas 135 units - BROOH F1 21,358'T/21,172'®3ft/min&F/21,172'T/19,91TC 1581min-1601RPM-440Igpm-2400/psl- Ream back to 20,009'- Flushed Top Drive gear box with HD32, Drain, and changed suction screen and discharge fiiter - Filled with 75W-90 new oil - Cleaned washpipe and lubricated quill seals - Circulated @ 200/gpm while servicing - Reamed down F120,009' TJ 20,018'- Trenched F/20,018' TI 20,038' as per DD parameters - 440/gpm - 2200/psl - 160/RP Time drilled Fl 20,038'T/ 20,050' - WOBN 5k - 160/RPM - 26k/Torque - 440/gpm - 22001psi -DrillinI L07 / 20,050' T/ 20,060' -160/RPM - 26-28krTorque - WOBI15k - 440/gpm - 2200/psl - P/U Wt 321 at 210k - ECD 11.34 ppg - Pumps shut down, Picked up off bottom, cycled pumps, found plugged jet, alternated parameters and cleared bit 660 2117/2019 01812019 - Drilled L07 F/ 20,067'T/ 20,394' as per DO & K&M parameters -1901 P - 24krTorque - 450/gpm - 2330/psi - WOB/15k - PIU Wt 315k - Rot Wt 210k - ECD 11.68 ppg - Max gas 62 units - Low lube oil psi shut down TD - Charged discharge filler & serviced rig while circulating @ 200 gpm - Drilled L07 F120,394' T/ 20,760' as per Dd & K&M parameters - 19o/RPM - 26kttorque - 450/gpm - 2360/psi - WOB/10.16k - P/U Wt 325k - ROT Wt 210k - ECD 11.7 ppg - Max gas 154 units - Took SCRs every 500' drilled - Drained oil out of TD, Replaced lube oil pump and fitters, filled with new 75W-90 oil & circulating @ 200/gpm - Serviced rig - Drilled L07 F/ 20,760' IT/ 20,872' as per DO & K&M parameters - 1901RPM - 23-26k/Torque - WOBI10-17k - 450/gpm - 2400/psl - P/U Wt 320k - Rot Wt 210k - ECD 11.63 ppg - Max gas 122 units 67. 2/18/2019 PJ1912019 - Drilled L07 F/ 20,872'T/ 21,148' as per DD & K&M parameters-1901RPM - 24krrorque - WOB/15-30 k - 460475/gpm - 2425/2625/psi - P/U Wt 335k - Rot Wt 220k - ECD 11.82 ppg - Max gas 117 units - TDS shut down due to low oil pressure - Stand back one stand and drain oil in TO, - checked lube oil Dow sensor - Filled with new oil and changed filters - Drilled L07 F/ 21,148' Tl 21,260' as per DD & K&M parameters - 190/RPM - 27krTorque - WOS/15-22K - 475/gpm - 2650/psi - P/U Wt 340k - Rot Wl 230k - ECD 11.94 ppg - Max gas 116 units - Drilled L07 F/ 21,148' TI 21,830' as per DD & K&M parameters - 190/RPM - 24- 26krrorque - WOB/15-20k - 475/gpm - 2600 psi - P/U Wt 335k - Rot Wt 205k - ECD 12.11 - Max gas 127 units - Took SCRs every 500' drilled. 88.0 2/1912019 2120/2019 - Drilled L07 F/ 21,830' (TD) as per DD & K&M parameters -160/RPM .24-26krrorque - WOB112-20k - 465/gpm - 2650/psi - PIU Wt 345k - Rot Wt 210k - Max gas 70 units - ECD 12.11 ppg - Took surveys and SCRs - BROOH L07 F/ 21,966' T/ 20,758 as per K&M parameters - 1601RPM - 26krrorque - 465/gpm - 26501ps1- Service Rig - Establish parameters and begin Trenching as per DD F/ 20.800'T/ 20,820' as per DD parameters - I SO/RPM - 24krrorque - 465/gpm - 2525/psi - Ti (ling F120,820' T120,834' as per DD Parameters -150/RPM - 24krrorque - 4651gpm - 2525Ipsl -Drillin LO F/ 20,834' T/ 20,853' as per DD & K&M parameters - 1801RPM - 26krTorque - WO6/15k - 485lgpm - /psi - PIU Wt 330k - Rot Wt 205k - ECD 11.67 ppg - Take SCRS - Top Drive shutting down - Change Flow paddle on TO lube system & circulate C 200/gpm - Drilling L08 F/ 20,853'T/ 20,867' as per DD & K&M parameters -1 SOIRPM - 26k/Torque - W01311 6k - 466/gpm - 26DOrjpsl - P/U Wt 330k - Rot Wt 205k - TDS continued shutting down - Switched spare wires In service loop - Serviced Rig - TDS persisted to shut down - TO L08 was called 20,86T - Changed oil and filters on TDS and BROOH F/20,867' 7/ 20.830'@ 1 1/2 ft/min circulating bottoms up each stand reamed - 160/RPM - 29k/Torque - 465/gpm - 26001psi - BR PIU Wt 210k - ECD 11.65 ppg 69.0 2/2012019 2/2112019 TO of H04 Mother bore @ 20867'. BROOH from l0 5'. 470 GPM, 160 RPM, 29k TO, 15 to 207min. slight pack off seen @ 20385'. Drop back in 10 feet, pulled slower, and it cearted up. BROOH from 20365' to 17,106 MD. Maintain 470 GPM, 160 RPM, 22k TO. Encountered minor cuttings beds from 17,556' to 17,105'. Shakers unloaded. 100% increase in cuttings load seen on shakers. 70.0 2/21/2019 212212019 BROOH from 17,105'to 15,668'. Varying pulling speeds with downhole conditions. Full drilling parameters. CBU two stands below shoe from 15,668 to 15,595'. Pulled Into casing with no rotary. No drag seen. Back ream out 3 stands into the casing from 15,408 to 15,130. Monitor well, static. Make up Halliburton storm packer and hang string off 65 feet from Door. Rig up and test ROPE. Witness waived by AOGCC. 71.0 2/2212019 2232019 Complete Koomey draw down test. Blow down choke manifold. Rig down test equipment. Drain stack Pull test plug. Set wear ring. Retrieve stone packer. Rig up filter cart, and pump TO gear oil through for one hour. (New filters were dirty after job). RID cad. BROOH from 15,128' to 10,060' MD. Monitor well on active pit system. Good hole fill. 72.0 21232019 2242019 Continue to BROOH from 10,060' to stand #11. 1203' bit depth. CBU. Monitor well. Static. Drop Gyro. POO on elevators to 634' MD. 73.0 2242019 2/252019 Trip out of hole on elevators. Gyro surveys recorded each stand to shrink the ellipse of uncertainty or future wel planning. Lay down BHA#6. Bit grade 2 -3 -BT -A -X -1 -CT -TD. Clean and Gear rig Boor of BHA oomponems. Prepare to run 4W liner. Load pipe shed with hanger and PBR with crane. Set GBR power tongs and graphing system on floor. Rig up. Remove drilling bales and elevators. Install casing bales and elevators. Install HT55 saver sub. Pick up firstjoint and baker loo silver Bullert shoe. Run 145 joints of 415" P110 HYD 563 15.2# liner. AVG torque=8200 fgins. Remove easing bales and elevators. Install drilling bales and elevators. Pick up hanger/PBRXO. Make up to casing string. Mix up 5 gallons of "palmic', pour into top of hanger, let set up for 20 mine. Trip In tole to 5686.22' (Length of liner and running tools). www.peloton.com Page 7f10 Report Printed: 3/20/2019 IU'NSt H04 -L04 Survey Geodetic Report Energy (Det Survey) comments MD He Incl 1-1 Aalm True f -I TVDSS 11111 TVD Old CIkM: BlueCre51 closure In Vertical Section Azimuth: 300.000'(TIue NOM) Field: COemopolikn Unit Fasting INUSI Vertical Seaton Origin: 0.000 fl. DODO ft Structure l Slot: Well: Cosmopolitan Pad l H-04(3) HN ,C)�{ y111 lrC TVD Reference Datum: WO Reference Elevation: Rotary Table 179650ftaE0ve Ma. Borehole: H04-L04'y1F iY`z^ ,y Ground Elevatlon: 145200tle1ove MSL APIA: 532312006163 M 59.8511190]0 -151.80167280 Magnetic Declinatlon: 14.4]4' Survey Name: H04LM MAS Total Gravity Field Strength: 10012613mgn(9.W685 Based) Survey Daft: February 10, 2019 000 Gravity Model: DO% Tort I AHD I DDI I ERD Ratio: 223328'117335044 h 17.03812.431 Saw Total Magrretk Field Strength: 55079653 nT Coordinate Reference Syshm: NAD27 Alaska State Plana, Zone 04 US Fine 0.05 Magnetic Dip Angie: 72.8]0' Location Let I Long: N 59' 51'M.48657, W 151' 46 6.02209' 0.60 Declination Data: January 15.2019 Location Grid NIEYA: N 2144597,860 MS. E 168803610 WS 0.54 Magnetic Declination Model: 1.10 M2018 CRS Grid Comergence Angle: -15532' 083 North Reference: True NOM Gdd Scale Factor: 1.00002484 214459].52 Grid Conve,gence Uaedc 0.0000 - Vanden I Patch: 2.10544.0 258.14 Total Cort Mag North- I'me North: 14,4741- 117 I'm 178 1 -.1 c -,i 1. .1 Hna,l comments MD He Incl 1-1 Aalm True f -I TVDSS 11111 TVD Old VSEL an, AND fln closure In NS Oil EW (III DLS ril"I NoMing 1111.15) Fasting INUSI Lathude L0,1gNude 1-1 RTE 0.00 0.60 000 -179.65 000 0.00 000 0.00 0.00 000 NIA 2144597.86 168803.61 M 59.8511190]0 -151.80167280 34.45 0.00 000 -14520 MAS 0.00 000 0.00 0.00 000 000 2144597.86 168803.61 59.85819010 -151.80167280 Saw 0.31 23144 -93.15 Saw 0.05 0.14 0.14 -0.09 -0.11 0.60 214459]]8 168803.50 59.85319046 -151.80167340 18100 0.54 255.22 1.35 181.00 OA6 083 082 -036 -0.14 030 214459].52 168802.86 59.858184]1 -151.80167683 7]530 0.64 258.14 95.64 2]529 117 I'm 178 4513 -1.69 011 2144597.32 168601.91 59.85818911 -151.80168197 370.20 0.75 26)35 19054 370.19 2.09 2.95 2.92 -072 -282 016 2144597.22 168800]] 5985818873 -151.80168817 465.00 1.40 295.51 28am 464.97 373 472 4.56 -0.44 -0.55 077 2144597.55 168799.04 59.85818950 -151.80169]61 Salim 2.21 281.40 360,01 elan 6.60 272 7.49 024 -7A9 0.86 2144598.60 168796.13 59.85819135 -151.110171352 655.00 3.45 28182 475.15 654.80 11.04 1239 12.12 1.18 -12.06 1.31 214499937 168791.59 59.85819393 -151.80173640 748.60 5.14 279.75 569.48 749.13 1].]2 1947 19.18 248 -19.02 1.79 2144S)0.% 168784.66 59.85819749 -151.80177627 844.20 I'M 2]].39 663.53 WAS 27.19 2966 29.37 3.97 -29.10 223 2144602.62 168]]4.62 59.$5820155 -151.80183110 938.50 9,21 278.18 75x85 936.50 3967 43.15 42.85 5.60 -42.46 210 2144604.82 168761.32 59.85820656 -151.80190374 1037.30 11.65 28160 85402 1033.67 56.48 6103 60.72 893 -Mm 256 2144608.42 16874381 59.85821514 -151.80199947 1080.14 12.65 282.32 895.90 1075.55 M05 ]0.04 69.72 IDD -6888 2.36 2144610.53 168]35.05 59.85822026 -151.80204744 1173.22 15.15 285.88 986.24 1165.89 86.56 9239 9200 1631 -90.51 2.84 2144616.62 168713.54 59.85823532 -151.80216525 1268.32 17.56 29015 10]].49 1257.14 112.76 11816 11956 24.65 -115.97 2.83 2144625.66 16BORM 59.85825814 -151.80230353 1351n 20.00 28970 1164.60 134374 14135 148.61 147.78 34.68 -14365 2.67 2144836.43 18866095 56.$5628556 -151.80245411 1453.88 22.48 287,92 1251.78 1431.43 1]5.1] 182.% 181.74 45.64 -17592 2,72 2144648.27 168628.99 59.85831556 -151.80262962 1548.73 2484 28SW 1338.65 1518.30 212.45 220,75 21974 57.61 -212.05 251 2144661.21 16859320 59.85834829 -151.60282613 1641.68 27.12 286.59 1422.20 1601.85 252.20 261,46 260.42 69.91 -Mm 2.64 2144674.57 168554.74 59.85838196 -151.80303719 - 1733.26 29.37 28575 1502.87 1682.51 294.28 304.79 303.75 8197 -292.48 249 2144(387.]6 16851346 59.85541494 -151.80326358 1826.71 3194 2MA9 1583.26 1762.91 340.43 352.44 35139 94.79 -338.36 275 2144701.82 16846791 ;38.85845003 -151.80351315 1922.88 31.33 284.53 1663.78 1843.3 39120 40SW 403.95 108.39 -389.14 2.54 2144716.80 168417.55 56.85640123 -151.80378930 ad 547 36.71 284.]6 1739.14 1918.79 443.07 45879 457.74 12200 -441.18 2.57 214473181 168365.90 59.85652444 -151.80407235 2108]4 39.00 284.62 1812.78 1992.3 498.27 516.02 51496 13(1.51 -49654 246 2144747,82 168310.95 59.$5856413 -151.80437347 2201.34 4118 28538 1883.62 2063.27 59587 57565 5]459 15195 -5MA4 2.41 2144764.83 168253.80 59.85860637 -151.80468673 2298.96 4325 23499 1954.43 2134.08 617.98 639.90 636.84 16877 -616.14 2.18 2144783.33 16818227 59.85865239 -151.80502396 2392.33 4534 285.09 202269 2202.34 602'm 706.50 705A3 186.06 -680.48 2.19 21448W,W 168128.45 59.85869966 -151.8053]3]8 2486.29 47.92 28543 2087.21 2266.86 ]43.3] 77439 Mn 20404 -746.34 2.76 2144822.12 16806307 5985874884 -151.80573215 2580.05 50.27 28560 2148.60 2328.25 81698 84556 614.59 222.99 -814.62 2.51 2144842.93 167991 $9.85880069 -151.80610351 2673.36 52.32 285.41 2606.91 2386.59 88].4] 918.46 917.40 242,46 -881.78 2.20 21408644.29 16]825.]3 59.85885392 -151.80648513 2767.32 54.71 265.77 2282.111 244246 960.64 934.00 992.94 262.76 -957.51 2.56 2144886.57 16785356 59.658911945 -151.80688088 2861.77 57.11 285.57 231574 249539 1036.42 1072.22 1071.15 283.88 -103285 256 2144909.73 16777864 59.85896123 -15180729049 2955.87 Sam 285.06 23%.12 2514.77 1113.90 115232 1151.25 305.03 -1110.10 268 2144932911 167702,19 59.35902507 -151.80771069 344749 62.75 26497 2403.29 2583.94 1191A2 123257 123150 325.83 -1187.62 345 214485587 16762516 59.85908193 -151.80813230 3142.03 San 28533 2450.68 2630.33 12]3.5] 1317.56 1316.49 34804 -1269.65 274 2144960.30 167543.86 5939914268 -151.80857851 32lam 67.47 28530 2488.24 2667.89 13X71 1403.51 1402.44 370.74 -135255 229 2145005.25 167461.61 59.85920476 -151.80902939 3329.87 66.90 284.85 2523.18 2702.83 1441.07 1490.81 1489.74 393.44 -1436.85 1.56 2145030.24 16737].96 59.85928885 -151.80918791 3423.43 63.82 284.82 25X.92 2736.57 152529 15]8.0] 1577.00 415.19 -152120 0.09 2145054.87 167294.24 59.35932195 -151.80991673 351885 68.84 285.45 2591.31 2770.96 1611.11 166687 1665.79 438.9] -1606.91 062 2145080.38 16720919 59.85939134 -15181041295 Cosmopolitan Unit\Cosmopolitan Pad\H04\H04-L04\H04-L04 Drilling Office 2.10.544.0 . Schlumberger -Private 4/3/2019 3:12 PM Page 1 of 4 Commsms &e";A MD Incl M. hue TVDSS 3706.36 68.83 285.60 2658.93 379924 68.9] 266.24 2892.36 305.0 68.92 28592 2]2].05 3968.29 69.10 286.09 2760.18 4082.16 66.88 26510 2]93.84 417559 68.40 26624 2827.9 426908 68.86 265.]] 2861.94 4362.79 68.51 285.89 2896.00 4456.71 68.93 285.74 2930.11 454996 69.16 286.39 2963.43 464229 MAO 20.00 2996.81 4739.52 88.70 286.09 3932.32 4832.43 69.07 286.7 3065]9 4925.35 0.99 285.67 3099.04 518.79 68.98 285.81 3132.55 5113.10 69.21 286.40 3166.20 5207.20 69.28 286.60 3199.55 5300.71 66.86 286.34 3232.94 99525 66.84 266.34 326703 5488.48 68.77 285.67 3300.74 5583.10 68.91 265.49 3334.87 %75,% 68.87 285.90 3388.26 5]]2.62 68.81 268.0 UO3.19 50000 00 28620 341302 582698 69.35 MAO 3422.0 592043 68.1 286.44 34551 014.44 0.1 20.87 340.0 6107.26 68.24 287.0 303.83 6201.26 014 287.53 350.64 6295.03 0.41 20.20 303.24 6399.10 69.26 20.07 307.21 6482.0 68.91 284.92 360.67 077.0 0.98 20.97 361.72 07226 0.19 20.62 3728.81 9680 0.19 20.0 3762.71 685942 68.76 MOO 3796.55 6953.87 68.66 20.0 3830.1 ]1].00 68.93 265.1 306.53 7140.85 MAO 21.74 3098.37 7234.40 NAB 265.00 3932.4 732643 68.57 285.1 3986.87 7421.15 68.91 285.23 4090.49 7515.10 68.82 z1.3z 4034.36 ]08.]9 0.0 21.33 400.11 ]]03.55 6878 MAO 4102.27 7797.02 69.07 21.71 4135.0 7690.]0 66.45 265.38 4169.81 ]91.0] 6900 20.16 4203.0 0]].30 0.79 285.90 4237.26 8170.90 661 20.4 4271.09 820.20 8672 286.0 43022 8360.83 68.1 286.51 4339.83 152.79 0.0 20.4 4373.19 817.93 68.90 286.41 440].65 81151 0.61 287.33 4441.56 935.44 68.45 287.0 44751 8827.61 68.55 20.43 450912 8921.0 0.74 20.39 413.1 9016.1 0.0 287.42 4578.30 9110.4 69.26 286.29 4611.]9 9216,05 0.54 286.28 4150 9297.30 0.19 28.11 4679.13 9392.40 68.98 286.97 471308 10.21 0.00 20.48 4]46.]1 TVD VSEC AND Closure N8 2838.58 1]80.]6 184198 1840.90 486.20 2872.01 1864.81 1928.63 192].55 509.91 2906]0 1952.28 2018.74 2017.65 534.93 2939.83 2036.06 2105.09 2104.00 50.74 2973.49 212105 219212 2191.63 M.74 3007.52 220547 22]9.]4 2218.64 606.66 3041.59 228994 2368.60 2365.69 Nom 307565 237059 2451.10 2452.99 61.0 310976 2459.49 2511.67 2510.56 678.36 3143.06 2543.95 2628.70 262].58 702.45 317646 2627.55 U14.]8 211366 726.46 3211.97 2715.40 2805.30 2804.17 751.47 324544 2799.54 289197 2890.& 115.55 32]669 2883.70 2918.73 2917.61 799.35 331220 2968.24 3065.96 3064.83 M.01 334585 305916 315108 3152.93 80.45 3379.20 3139.32 3242.05 3240.91 872.45 3412.`.5 322425 3329.40 332825 897.21 3460 3309.93 347.58 3416.42 922.02 3480.39 3394.27 3504.50 3503.34 90.5.86 3514.52 34]9.]4 3592.75 3591.59 969.69 350.91 3563.60 3679.29 3678.13 993.10 3582.84 3651.14 3769.53 3]0.3] 101789 3592.67 367594 3795.06 3793.92 1024.0 360225 370045 3620.31 3819.14 1032.06 30559 3785.31 3907.0 390.43 1056.74 30953 387061 3995.28 391.09 101.0 3703.48 3954.6 40186 4080.45 1101.46 373829 410.13 410.96 416].]2 1133.81 3]]2.0 4125.00 4256.13 4254.86 110.0 306.0 4209.0 4313.66 4342.0 1182.73 3840.32 4294.0 431.43 430.14 1205.39 3874.37 430.18 45190 4518.0 1228.95 39046 40.75 4808.16 406.87 1252.98 312.36 4550.35 4695.51 4694.22 1276.41 397620 4631.60 082.63 081.34 1390.10 401049 020.12 4870.0 459.34 1324.11 40418 48126 407.46 4956.17 130.63 407002 4688.93 51099 043.70 1370.71 4112.09 4913.0 5132.12 5130.81 1393.07 4146.52 09.0 5219.0 018.31 1415.75 4160.14 5141N 5306.03 004.71 1438.31 4214.01 5225.63 5393.66 092.33 1460.66 424].]6 5309.79 18106 1]9.]1 1482.28 4281.92 5394.91 5569.45 5568.9 150421 4315.53 17899 00.9 05527 1526.7 4349.46 5563.35 94399 5742% 1548.88 430.34 560.0 030.99 58290 1572.53 4161 932.09 017.97 5916.57 106.55 445014 01884 605.24 003.1 1620.85 41.87 5902.0 603.15 091.]3 116.00 451948 596.10 6182.29 610.0 1671.0 4552.1 07242 629.99 6266.55 105.0 407,30 61062 6356.9 6355.23 172092 4621.21 043.56 643.89 64243 1746.23 4655.59 6328.88 6531.31 7.129.60 1]]243 4689.31 112.16 01106 01549 170.92 0230 186.0 671.0 90293 1826.56 057.95 60516 6793.21 679149 1853.81 4791.44 6670.4 6880.79 079.0 187920 4825.15 670..31 6968.16 6966.42 190310 480.78 039.78 7055.13 7053.39 1927.0 4892.73 6926.11 7143.97 714222 1953.24 4926.36 701140 723151 7229.78 1978.45 EW DLS NolMing E4M61g LMUd. Lolgitu6z -1690.37 0.34 2145105.95 167126.39 59.85945510 151.81086691 -1855.53 0.20 2145132.18 167041.91 :19.85952049 . -151.81133013 -1858.86 066 2145158.20 16695926 59.85959548 -151.81178336 -1945A5 0.31 214518551 186873.38 59.85965973 -151.81225436 -2028.46 028 2145211.57 168791.05 59.83971883 -151812]0596 -2112.73 0.45 214523].85 166707,45 59.85978445 -15181316428 -2196.39 0.74 2145264.05 16662448 59.85981990 -051.81361931 -2260.08 0.68 2145290.33 166541.48 59.85991553 -151.81407452 -236496 0.39 214016.42 166456.16 59.85999061 -151.81453138 -244632 OAT 2145342.56 166374.59 59.86004598 -151.81498969 -2531.95 070 2145968.91 168291.64 59.86011172 -151.815440 -2614.62 0.85 2145395.16 16620985 59.96017736 -151.81589427 -270161 0.26 2145122.54 166123.37 59.86024575 -151.81636745 -271.87 0.41 214548.87 166040.80 59.86031157 -15181682035 -2868.30 0.51 21450493 165959.04 59.98037663 -05181]2]421 -2952.26 0.14 2145500.87 165874.76 59.8804131 451.81]]3089 -3036.90 0.0 214552].60 165790.81 59.86050811 -151 81819132 -3121.27 021 2145554.88 10707.15 59.8609643 -15181865027 _ -3205.03 O W 2145591.91 165624 09 0.8606412 -151.81910590 320.65 0.1 2145660.01 165540.17 0.86071192 -1510195,B819 3873.20 0.67 214563524 165457.30 %.8077743 -15182002070 3459.21 025 2145661.25 1653]2.9] 59.86084221 -1518218311 -3541.53 042 214560.92 165290.32 59.66090619 -151 82093834 -3628.29 0.11 214914.06 16521.26 59.8097396 -151.82140830 -302.64 t2t 2145721.82 16579.91 08099332 -151.82154185 -39].05 121 2145729.55 165155.90 59.86101267 -15182167355 -37019 0.55 2145756.50 165072.0 0.010011 -151.82212907 -384.78 0.43 2145783.90 1109.0 0.0114878 -1518225650 -3927.29 00 214011.73 11070 0.0121873 -1518230340 4010.53 009 2145840.33 11825.30 0.0129075 -1518234870 -4093.94 1.32 21406].8 11]4261 59.8613591 .151.8231137 4178.41 144 2145893.81 11658.81 59.86142444 -1518246092 420.0 0.40 214018.76 11574.0 0014034 -151.824010 4348.26 1.1 2145944.62 11490.28 59.861M070 -151.82532487 4433.20 040 2145970.95 1640602 59.86161636 -151.8298696 457.35 9.12 2145993.66 11322.53 59.96168638 -151.82624474 401.19 0.0 214022.0 11239.3] 59.0174511 -15182670082 4685.0 0.47 214048.93 11155.39 0.0181069 -151.82716141 4769.43 0.38 2140]4.]2 1107248 0018740 -151.82]6160] 4853.87 1.10 2146100.09 163998.70 59.86193802 -151.8260711 4938.0 0.43 210124.73 163905.13 0.019010 -151826930 5022.0 010 2146149.]0 163821.26 08620611 4518289932E 5106.0 0.41 2148174.52 10738.49 0.021229 -151.8294003 _. -5190.73 091 2146199.16 163654.40 002183]1 -151.8299998 57542 0.15 2146223.08 163570.33 0.022427] -151.8303609 -5361.1 020 2146247.33 163465.33 59.11E2302EE -151.8396349 -545.45 048 2146271.9 163101.5 59.0236264 -151.83129369 -5529.76 0.90 2146296.% 183317,89 5986242466 -151.83175235 -561649 0.98 2146322A9 163234.83 59.86248925 -151.8322987 .W9789 0.34 2146348.]] 10151.92 08625185 .151.832021 -570.91 0.1 214075.35 16306.78 086262124 -151.83311866 -5865.14 038 214102]] 16290.26 086268991 -1518339692 -5950.55 0.31 214130.1 162900.59 59.862]59]0 -151.834119 -032.73 024 21419.17 162819.09 0.028208 -151.8348866 -6117.79 0.29 21411.55 19]31.14 59.8628156 -151.83495143 -6201.25 0.97 2146512.12 162651.99 5986296369 -151.831059 -621.0 028 2146100 162569.31 0.86303524 -151.005923 -6366.21 0.89 2146569.27 162488.53 59.86310759 .151.83630298 -64926 0.21 2146599.16 162406.26 08018309 -151.8367181 4533.0 0.0 2146628.69 16232270 0.03290 -151.83721362 -661]41 120 2146658.35 162239.80 59.86332695 -151.8376691 -901.26 0.77 214083.12 16210.4 0.86339374 -151.8381207 -6]1.]9 0.72 21467M6$ 1629360 0963400 -151.83858030 -8889.95 0.9 214937.24 161989.16 59.86352903 -151.8391361 -6953.81 049 21491]1 161906.01 59.86359785 -151.8319391 Cosmopolitan UnN\Cosmopolitan Pad\1104\1104-1-04\1104-1-04 Drilling Office 2.10.544.0 .Schlumberger-PrIVate 4/3/20193:12 PM Page 2 of MD Intl ANm True WDSS ND VSEC AND clown, NS EW OLS Northing Using LMWOe LongNu04 COmmenl 9560.37 69.07 286.09 47M 40 4960.05 7096.63 7319.47 7317,71 2002.36 -7038.42 1.38 2146790.92 161822.08 M.M3N315 451.83986023 %7375 WW2 264.59 4813.72 4993.37 7160.83 7406.70 740483 2024.71 -7122.75 O.W 214681555 161736.39 %%372414 -151.84041900 9787.11 W41 281.78 4846.78 W26.43 7265.04 7494.01 7492.22 2046.84 -7207.21 0.0 2146639.97 161654.% %.80784W -151 M087852 9661.17 WM 284.9'7 488022 W%.87 7349.91 7581.92 1560.12 2069.41 -7292.17 0.54 2146664.& 16157024 5986384616 -151.84134079 9855.01 68.98 285.60 4913.92 %93.57 7430.62 76m.W 786)70 20W.W -7376.65 0.63 2146890.22 161486.42 59.86390918 -151.04180043 1WW.17 69.05 26561 4948.00 5127.65 7520.72 7758.35 77%54 2116.% -7462.19 0.22 214691659 161401.57 5986397483 -151.80226578 10144.92 68.97 285.70 4%1.94 5161.59 7606.6 7846.81 7&5.01 2140.57 -7547.33 0.14 214694292 161317.11 5986404040 -151&272900 10237.19 69.39 28551 931474 5194.39 7689.99 793306 7931.25 2163.77 -700.39 0.49 2146968.37 16123V1 5986410373 -15184318095 10331.86 6931 28522 %48.13 MV.78 7775.73 802167 W19.85 218.24 -771583 0.30 214WNA6 16114993 %%416781-151.843MM0 10425.43 69.25 285.51 W81.23 WW.0 78%.39 6109.17 810135 2210.45 4800.20 0.33 214701965 16106623 5986423115 -151.8410482 10517.11 68.66 285.76 5114.15 5293.% 794329 8194.73 8192.91 2233.55 -7882.% 0.0 214044.63 160984.% %.86429119 -151.8445208 1061084 69.16 285.05 5147.68 5327.53 8027.92 8282.18 82%.36 2295.79 -799.69 0.90 2147070.51 160900.85 %86435763 -151.84931177 10704.% %92 28.16 5181.41 5361.9 811269 8369.70 8367.64 2278.12 -8051.76 1.90 2147094.14 1W816.% %66441M3 -151.645473% 10798.48 66.82 282.74 521526 5394.91 819585 845730 84M.M 228.75 -8137.14 043 2147116.M 1W731.77 %.86146938 -151.84593806 10891.8 68.79 28327 5248.95 5428.60 827691 8544.19 8502.12 2317.M -82130 OM 21413193 1606419 59.66152272-151.MMW66 1ON727 983 264.24 5283.51 549.16 6364.51 933.33 031.20 2338.% -839.38 095 2147161.47 160561.71 %.045954 -151.8466682 1108124 0.93 29.91 M1737 5497.02 &4901 8720.98 8718.84 2360.% -8393.21 0.67 2147185.9 160177.53 %.86461077 -151.64733130 11175A9 68.84 284.90 951.32 530.97 8533.% BW8.91 880676 2383.17 -8478.18 0.10 2147210.75 1W39.18 %.047943 -151.847793% 11267.45 941 28455 5384.84 564.49 016.51 994.54 MUM 2404.94 -89180 0.53 2147234.77 160310.96 59.66476184 -15184944M - IIWa23 63.75 284.36 5119.9 5599.47 879.42 mean 8981.2 2427.21 -861134 0.40 214725937 1W225.28 %9&62259 -1513487139! 114%M 68.79 20.26 Mm.9 NZ125 80.35 W7047 90948 244914 -8731.1 0.9 2147283.9 16014183 %86188324 -151 M917143 11%0.64 6917 20.81 548.36 568.01 881.21 9168.52 91532 247223 481625 OW 2147308.8 16008.61 59.86191511 -151.8403305 1161431 68.78 MM 520.97 5700M 895.8 920.595 9243.74 2494.49 490.81 043 2147333.8 15W73.72 59.05%814 -151.85009310 11739.27 6903 285.51 555.15 573480 9641.19 9334.55 9332.34 2517.% -8966.% 0.N 21473M.91 159666.85 M.Wa)m17 -151.85055&7 11833.52 68.N 285.07 5563.98 57M.M 9126.28 9422.51 N2030 2540.81 -981.18 0.49 2147384.46 15980/87 59051329 -151.85102013 11924.32 W.m 285.57 59163 %01.48 929.16 9507.16 9%4.9 2563.17 -9152.82 0.N 2147409.04 1%723.0 59.0519354 -151.85146134 1618.M 69.13 28554 5655.73 595.38 9293.28 9W5.M 9592.85 206.75 -U37.M 0.47 2147431.90 159639.65 59.862885 -151.0192510 12112.M Nm 28554 5669.36 %69.01 9378.28 9682.84 96M.M 261026 -982.8 0.19 214740171 159555.75 59.092201 -151.85238526 1220.16 63.9 284.0 5723.01 599.0 9462.78 977022 868.00 2633.24 -9406.37 O.M 214745.98 159411.11 SABW8471 -151.85284393 1239.16 69.02 265.34 85.75 5936.40 951199 98.95 955.73 26%.17 -8491.06 0.38 214751120 159368.8 %8659726 -151033 74 12392.91 6889 28530 5789.9 509.63 991.35 99M.M 9942.32 2679.05 -9574.57 0.05 2147536.34 159305.21 58.8855007-151.8M7599 1248.9 68.76 285.34 63239 0151 816.33 1032.39 16030.16 2702.26 -6%29 0.25 2147561.0 159221.15 W.M57296 -151.85422015 1291.22 9.% 286.08 59518 6037.52 9801.41 10120.19 1011197 2726.04 -9743.9 0.76 21458.91 159137.30 58.0563784 -151.8546808 128395 NM 286.51 5891.21 W70.0 9865.48 190]2 10204.49 27M.31 -996.8 044 2147614.44 15054.94 %.868048 -151.851319 12769.34 68.96 286.09 5925.51 619.16 9971.95 1029573 10293.49 2775.30 -9912.30 0.42 214611.74 158970.22 %8977223 -151.85559680 12864.42 67.4 28512 5960.9 6140.45 1057.67 1038462 10381.76 279.9 -99%.10 1.57 214760.0 1MM6.11 %.B0MW4-151.BWW28 129M.37 68.16 286.67 599627 6175.92 1014225 10471.01 10166.76 2824.49 -1008051 096 21495.49 1509.38 %66%0613 -151.8%51228 13051.65 68.8 28718 W30.M 621024 10226.75 1057.75 1055.48 264981 -10163.9) 0.9 21493.06 158721.14 %.658552 -151.8596370 13145.08 M.44 28.28 6064.75 99.40 10311.9 1064431 1012.40 WSA4 -10246M 0.25 21475114 15863883 %66604600 -15.8574155 13238.01 68.91 296.44 698.54 M78.19 10395.9 10731.28 182895 2900.75 -10329.38 0.% 214778.49 15855670 %6911449 -151.8886636 13330]9 89.9 296.33 613182 6311.47 10490.05 108116 10815.M 2925.18 -1042.4 0.20 214W5.9 1044.30 %8018113 -151.856318% 13424.91 68.78 29.04 6165.67 631532 1056.33 1605.71 1099.37 2919.0 -104%.81 0.41 214791.91 158390.0 %6662491 -151.8977744 1351924 67.93 265.6 62946 63W.11 1065035 10993.% 1091.05 2973.% -10%1.16 0.99 2148%.15 1030.0 %6031316 -1513%23613 136139 68.26 265.9 93577 641542 1835.40 11M1.19 11078.86 298.21 -10665.73 035 214881.06 156223.08 %8663779 .15185969662 - 1370184 68.32 20.0 6270.% 6 %18 1082003 1110.49 11166.15 3021.01 -1849.77 048 2147910.13 1%13937 %6944246 -15136615365 13M325 69.15 MAO 6305.13 6484.78 1908.20 11257.40 11250 3015.11 -10835.30 138 21479N.W 15605187 %.895921 -151369/935 13695.49 6932 286.15 6337.53 01218 10969.91 11313.76 11311.42 3066.99 -1618.41 0.9 214962.29 157972A3 %.06.57724 -151861071% 139632 69.30 285.95 6370.38 SWa03 118522 1143166 11429.32 362.89 -11M2.N 049 214988.8 15789.85 M.86663851-151881M123 140936 6928 266.12 640342 6563.07 111W.9 11519.6 11516]2 311703 -1109.88 0.17 214M1529 15785.34 %0670135 -1513619694 141756 9.35 266.11 643625 W15.M 11214.43 11606.0 116310 3141.16 -11170.40 0.N 214M41 W 157112.W W.MCr7016 -15136244285 14269.9 69.31 2M.29 646951 8649.16 11330.0 11694.16 1101,81 316576 412507 0.18 214809.9 157638.54 %86683724 -151.682M3W 14364.39 %87 285.53 6W322 886287 1141565 117MA1 11780.0 318899 -1133992 0.84 214MM 11 18554.37 918666331 -151.89023 1448.05 M.20 285.27 653638 81603 11499.0 110890 11866% 321300 -11423.33 0.47 2148120.M 184161 5986896605 -151.86381921 1451.0 0.63 265.16 6569.73 849.38 115859 11984 1195.12 323624 -11 W876 036 214814593 18386.84 %.M79940 -151.86428411 14615.17 69.17 265.17 6M231 89.36 1199.88 1209.8 1204261 4%13 -11%3.22 037 2148171]1 18303.04 %.8809180 -151.864436 14739.31 6960 285.32 8635.0 W1551 1950.79 1213308 12130.72 328230 -11678.23 048 214816.5 182189 %881546 -151.66520628 14833.4 9.91 285.M 66%20 68186 118400 12221.19 122189 3305.71 -11763.17 0.72 214822230 181MA1 69,072189-151.0MN4 14926.9 %M 28594 802.9 892.31 11924.45 1230828 12305.9 332930 -1184.00 OM 214824816 1805126 %.8828312 -151.8661240 1%21.03 60.39 286.02 67X% 8916.8 1200961 12396.05 1239.6 339.4 -1191.38 0.65 214827461 1568.% %.0734900 -151.06%NB 1511549 68.20 29.08 677185 6951.% 12091.78 1249.81 12481.45 3377.73 -1201572 0.21 2146301.16 15693.91 %9741515 -151.970429 1529.61 9.48 286M 630622 6965.8 12178M 12570.36 1268.6 349.8 -1209.77 0.% 2148327.74 1%801.W %867481% -151.8674949 15302.4 69.9 287,22 681021 70190 12264.09 1265)85 12655.46 M27.W -1216248 0.89 2149M.45 15818.% %867550M-151.8679W38 127097 7007 29.19 6864.12 701337 12326.81 1272264 12719.61 397.02 -122439 1.9 219976.9 1%657.6 %857M4M -151.86328315 958' 154069 71.14 2930 M7576 70.55.41 123%16 127559 12752.62 345138 -1227501 am 21498.63 156626.88 598863230 -151.06845390 Cosmopolitan Unit\Cosmopolitan Pati\HO4\HO4-L04\HO4-LO4 Drilling office 2.10.544.0 . Schlumberger-Private 4/3/2019 3:12 PM Page 3 of 4 H04 Rev 1 Actual Mud Weight vs. Depth Data Table Days Depth MW From MD ppg Operational Notes Spud 0 8.6 PU DP / Prepare BHA / fill conductor 0 267 8.8 Spud well / drill to 308' for RSS BHA 1 758 9.0 Drill to 310'/ TOH for RSS BHA / TIH & Drill 17-1/2" 2 2430 9.8 IlDrill 17-1/2" surface section / 68 deg angle 3 3860 10.2 Drill 17-1/2" surface section / 68 deg angle 4 4910 10.25 Drill 17-1/2" surface section / 69 deg angle 5 5810 10.45 Drill 17-1/2" surface section to 5810' MD / BROOH 6 5810 10.4 BROOH for casing / LD BHA / RU to run 13-3/8" 7 5810 10.2 Run 13-3/8" surface casing 8 5810 10.3 Run 13-3/8" surface casing 9 5810 10.0 1 Run & cement 13-3/8" surface casing 10 5810 10.0 Displace cement / bump plug / install starter head 11 5810 9.6 NU & test BOPE / clean pits / build OBM / top job 12 5810 9.6 Work on top drive / MU BHA #3 cleanout BHA / PU DP 13 5810 9.6 TD rail alignment / RIH w/ singles & cleanout BHA 14 5810 10.5 Test casing to 3K; drill out shoe track / swap to OBM 15 5810 10.5 POOH for RSS BHA / Test BOPE 16 5810 10.5 Test BOPE / Dummy Run 9-5/8" Hgr / RIH w/ RSS BHA 17 5963 10.5 RIH / Drill out shoe / FIT 13.2 ppg / Drill ahead 18 8590 10.5 Drill intermediate section w/ RSS BHA 19 11031 10.55 Drill intermediate section w/ RSS BHA 20 12790 10.55 Drill intermediate section w/ RSS BHA 21 14394 10.6 Drill intermediate section w/ RSS BHA 22 15420 10.55 Drill intermediate section w/ RSS BHA to Csg Point 23 15420 10.55 Circ & Cond at TD / Backream out for Casing 24 15420 10.55 Backream out for Casing 25 15420 10.5 POOH for casing / LD BHA / Test csg rams / RU to run csg 26 15420 10.55 Run 9-5/8" casing 27 15420 10.5 Run 9-5/8" casing 28 15420 10.6 Run 9-5/8" casing; land at 15406' MD; cement same 29 15420 10.65 Cement 9-5/8" / clean pits / chg rams / MU drill pipe 30 15420 10.65 Test BOPE / MU BHA 5 for production section 31 15420 10.2 1 RIH / test csg to 3500 OK / clean out shoe track 32 15440 9.3 Swap mud systems/ drill 20'/ run FIT to 13.5 ppg EMW 33 16828 9.4 Drill 8-1/2" section to 1-01 / TD in L01 lateral/ BROOH 34 16445 9.4 Trench & timedrill to L02 lateral 35 18230 9.5 TD in L02 lateral / BROOH 36 17957 9.5 BROOH L02 / Trench - ST- Drill L03 37 19017 9.5 TD in L03 lateral / BROOH / spot LCM pill 38 19017 9.5 BROOH to inspect / change BHA / chk Super Sliders 39 19017 9.5 BROOH to inspect / change BHA / chk Super Sliders 40 19017 9.5 Inspect BHA / LDDP / remove worn out Super Sliders 41 19017 9.5 Manage drill pipe / test ROPE 42 19017 9.5 PU DP / MU BHA / RIH to drill L04 43 17690 9.55 RIH / Circ and condition mud / Prep to drill L04 44 17865 9.3 Trench & timedrill to L04 lateral / reduce MW 45 19635 9.2 Drill L04 lateral / seepage mud losses ongoing 46 20094 9.2 Finish & Backream L04 / Trench & drill L05 lateral 47 19888 9.25 Drill L05 lateral 48 20735 9.3 Drill LOS lateral / BROOH in L05 49 19513 9.2 Drill L06 lateral 50 20855 9.2 Drill L06 lateral 51 21358 9.2 Finish L06 / BROOH / Trench & ST to L07 52 20872 9.2 Drill L07 lateral 53 21830 9.2 Drill L07 lateral 54 21966 9.2 ITrench & ST to L08 / Drill L08 lateral partially / top drive issues / BROOH 55 20867 9.2 TD of L08 Mother Bore is 20867' MD / BROOH to shoe 56 20867 9.2 Hang Off & Test BOPE - 14 days / BROOH 57 20867 9.2 BROOH 58 20867 9.2 BROOH / POOH on elevators 59 20867 9.2 LD BHA / MU 4-1/2" slotted liner / RIH 60 20867 9.2 Run 4-1/2" slotted liner / enter LO3 wrong lateral BROOH 61 20867 9.25 IBROOH / Pump out with 4-1/2" slotted liner 62 20867 9.2 Lay down 4-1/2" liner 63 20867 9.2 Lay down 4-1/2" liner/ Repair Top Drive 64 20867 9.3 Service rig / wait on Top Drive parts and Tech 65 20867 9.3 Tesco Tech arrived / tear down Top Drive / repair same 66 20867 9.3 Complete Top Drive repairs / MU Cleanout BHA -7 / RIH 67 20867 9.3 Manage drill pipe / RIH w/ cleanout BHA -7 68 20867 9.3 RIH w/ cleanout BHA -7 / hang off on RTTS packer at shoe 69 20867 9.25 Test BOPE /Release RTTS /Ream in hole clean out L01 junction 70 20867 9.25 Clean out open hole / dress junctions for liner / clean to TD 71 20867 9.3 BROOH and dress each junction area 72 20867 9.3 BROOH and dress each junction area/ BR & Pump Out 73 20867 9.3 Pump out for liner 74 20867 9.4 LD Cleanout BHA / MU 4-1/2" slotted liner / RIH on 5-1/2" DP 75 20867 9.4 Run liner to TD / set hanger & packer / circ well to brine 76 20867 9.2 Circ Well to Completion Brine / POOH / LDDP 77 20867 9.25 LDDP / RU and run 3-1/2" tubing upper completion 78 20867 9.25 RIH w/ 3-1/2" tubing upper completion & accessories 79 20867 9.25 RIH w/ 3-1/2" tubing / land same / shear valve / test SSSV - OK 80 20867 9.25 LD landing joint / set TWC / clean BOP stack / remove BOP 81 20867 9.25 Remove adapter spool / NU & pressure test tree / Slickline work 82 20867 9.25 Turn well over to production / install GLV / cold stack rig 83 20867 1 9.25 ISet Top Drive in shipping cradle / cold stack rig 84 H04 Fishbone Well Naming & Numbering Index Well Name PTD No. from AOGCC API No. from AOGCC Final TD (MD) Notes H04 Mainbore 218-126 50-231-20064-00-00 20867 Final completed wellbore with 4-1/2" slotted liner in 8-1/2" hole H04-1-01 218-127 50-231-20064-60-00 17200 8-1/2" Open Hole completion 1404-1-02 218-128 50-231-20064-61-00 18230 8-1/2" Open Hole completion 1-104-1-03 218-129 50-231-20064-62-00 19017 8-1/2" Open Hole completion 1404-1-04 218-130 50-231-20064-63-00 20094 8-1/2" Open Hole completion 1-104-1-05 218-131 50-231-20064-64-00 20735 8-1/2" Open Hole completion H04-1-06 218-132 50-231-20064-65-00 21358 8-1/2" Open Hole completion 1404-1-07 218-133 50-231-20064-66-00 21966 8-1/2" Open Hole completion KOP TD Actual Lateral Lateral Planned Actual Actual Footage Volume (bbls) H04 Mainbore 15479 20867 5388 378 LO1 16382 16060 17200 1140 80 L02 17180 16860 18230 1370 96 L03 17980 17690 19017 1327 93 L04 18780 18440 20094 1654 116 LOS 19580 19220 20735 1515 106 L06 20382 20038 21358 1320 93 L07 21180 20820 21966 1146 80 Total 14860 1043 Top Prod Interval TPI NAD 27 TD NAD 27 MD X Y Govt Sect MD % Y Govt Sect H-04 15406 156626.45 2148387.65 318' FSL, 3275' FEL, Sec. 33, T35, R15W SM 20867 152064.83 2151357.513158' FSL, 2634' FEL, Sec. 32, T3S, R15W SM H-04-LO1 16060 156047.05 2148669.5 584' FSL, 3862' FEL, Sec. 33, T3S, R15W SM 17200 155176.67 2149306.03 1196' FSL, 4749' FEL, Sec. 33, T3S, R15W SM H -04-L02 16860 155369.4 2149093.85 989' FSL, 4551' FEL, Sec. 33, T3S, R15W SM 18230 154323.31 2149854.92 1720' FSL, 335' FEL, Sec. 32, T3S, R15W SM H-04-LO3 17690 154696.95 2149580.21 1456' FSL, 5236' FEL, Sec. 33, T3S, R35W SM 19017 153688.88 2150327.54 2175' FSL, 982' FEL, Sec. 32, T3S, R15W SM H-04-LO4 18440 154082.59 2150009.61 1868' FSL, 580' FEL, Sec. 32, T3S, R15W SM 20094 152790.62 2150874.58 2696' FSL, 1895' FEL, Sec. 32, T3S, R15W SM H -04-L05 19220 153431.59 2150438.89 2279' FSL, 1242' FEL, Sec. 32, T3S, RSSW SM 20735 152250.73 2151247.85 3054' FSL, 2445' FEL, Sec. 32, T3S, R15W SM H-04-LO6 200381 152750.511 2150891.73 2712' FSL,1936' FEL, Sec. 32, T3S, R15W SM 213581 151719.8 2151598.67 3390' FSL, 2985' FEL, Sec. 32, T3S, R15W SM H -04-L07 208201 152104.111 2151331.71 3134' FSL, 2594' FEL, Sec. 32, T3S, R15W SM 219661 151206.781 2151953.08 3729' FSL, 3508' FEL, Sec. 32, T3S, R15W SM 01 1246 17� l2$ 1,21 t5b 13t 132 133 r rIV" V OUX 1'4' 21e-1 3 0 fill hABORS / CANAIG RECEIVED MAR 2 6 2019 Will: H0 :_ : _ ry Sample Boxes) Main, API: 50-231-20064-00-00 (Shipping Box #2 - 5 Dry Sample Boxes) Main, API: 50-231-20064-00-00 (Shipping Box #3- 7 Dry Sample Boxes) 1-01, 1-02, L03, 1-04, 1-05, L06, L07 API: 50-231-20064-60-00, 61-00, 62-00, 63-00, 64-00, 65-00, 66-00 TD: 2/19/2019 Set Type Frequency Operator: BlueCrest Alaska Operating Date: 2/20/2019 5810'- 20867' TD LLC Washed and Dried 30' Well Name: H04 - Main, L01, L02, L03, 1-04, 1-05, 1-06, 1-07 prepared By: Benjamin Handley/ Barbara Delaney 16850'- 18230' TD Kenai Peninsula Borough, Washed and Dried 333 W 7th Ave, Suite 100 Location: Alaska Shipping: Anchorage, AK 99501 18440'- 20094' TD Hansen Field Washed and Dried Attn: Meredith Guhl (907)739-1235 Will: H0 :_ : _ ry Sample Boxes) Main, API: 50-231-20064-00-00 (Shipping Box #2 - 5 Dry Sample Boxes) Main, API: 50-231-20064-00-00 (Shipping Box #3- 7 Dry Sample Boxes) 1-01, 1-02, L03, 1-04, 1-05, L06, L07 API: 50-231-20064-60-00, 61-00, 62-00, 63-00, 64-00, 65-00, 66-00 TD: 2/19/2019 Set Type Frequency Interval (Feet/ MD) Main (11 Boxes, 504 Envelopes) Washed and Dried 30' 5810'- 20867' TD L01 (1 BOX & 39 Envelopes) Washed and Dried 30' 16040'- 17200' TD L02 (1 BOX & 46 Envelopes) Washed and Dried 30' 16850'- 18230' TD Loa (1 BOX & 44 Envelopes) Washed and Dried 30' 17690'- 19017' TD L04 (1 BOX & 55 Envelopes) Washed and Dried 30' 18440'- 20094' TD L05 (1 BOX & 51 Envelopes) Washed and Dried 30' 19220' - 20735' TD L06 (1 BOX & 46 Envelopes) Washed and Dried 30' 19988'- 21358' TD L07 (1 BOX & 39 Envelopes) Washed and Dried 30' 20827'- 21966' TD i Total Number of Dry Sample Boxes: 18 & Total Number of Envelopes: 824 Number of Dry Sample Boxes: 18 Packaged into 3 Large Shipping Boxes .05hipping Box #1: H04 Main Well Bore (6 Dry Sample Boxes) 6 Number of Envelopes: 283 5810• To 114300 Shipping Box #2: H04 Main Well Bore (5 Dry Sample Boxes) Number of Envelopes: 221 Shipping Box #3: H041-01, H041-02, H041-03, H041-04, 1-1041-05, H041-06, 1-1041-07 (7 Dry Sample Boxes) Number of Envelopes: 320 BLUECREST RIG #1 / JOB #: A1744/ WELL: H04 - Main, 1-01, L02, L03, L04, L05, L06, L07 X03 THE STATE 01ALASKA GOVERNOR BILL WALKER Larry Burgess Alaska Manager BlueCrest Alaska Operating, LLC 3301 C Street, Suite 202 Anchorage, AK 99503 Alaska Oil and Gas Conservation Commission Re: Hansen Field, Undefined Oil Pool, H04 -L04 BlueCrest Alaska Operating, LLC Permit to Drill Number: 218-130 Surface Location: 2173' FSL, 1552' FEL, SEC. 2, T4S, RI 5W, SM Bottomhole Location: 2687' FSL, 1852' FEL, SEC. 32, T3S, R15W, SM 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.olaska.gov Dear Mr. Burgess: Enclosed is the approved application for the permit to redrill the above referenced development well The permit is for a new wellbore segment of existing well Permit 218-126, API No. 50-231-20064-22- 00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair {l DATED thistg day of November, 2018. STATE OF ALASKA ALA A OIL AND GAS CONSERVATION COMMIS, N PERMIT TO DRILL frzrh�iTsYFYrTrF1 1a. Type of W 1 b. Proposed Well Class: to ry ❑Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: Drill ✓ Lateral tratigraphic Test ✓ Development - Oil ❑Service -Winj ❑ Single Zone ❑✓ Coalbed Gas ❑Gas Hydrates Redrill Reentry xploratory - Oil Development - Gas Service -Supply ❑ Multiple Zone ❑ Geothermal ❑Shale Gas 2. Operator Name: 5. Bond: Blanket ✓❑ Single Well ❑ 11. Well Name and Number: BlueCrest Alaska Operating LLC Bond No. 5511251547 H04- L04 ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 3301 "C" Street, Suite 202, Anchorage, AK 99503 MD: 20,051' TVD: 6,613' Hansen, Undefined Oil Pool 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 2173' FSL, 1552' FEL, Sec. 2, T4S, R15W SM ADL 18790, ADL 384403, Fee -Hansen ' Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 1859' FSL, 548' FEL, Sec. 32, T3S, R15W SM LOCI 14-007 11/15/2018 Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 2687' FSL, 1852' FEL, Sec. 32, T3S, R15W SM 14423 2493' (YO1664) 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 180.5 15. Distance to Nearest Well Open Surface: x-168813 y- 2144623.035 Zone- 4 GL / BF Elevation above MSL (ft): 145.25 to Same Pool: 2842'- H1AL1 16. Deviated wells: Kickoff depth: 18405 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 115 degrees Downhole: 3,549 psi Surface: 2,842 psi (using 7,070' TVD) 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) Driven 20 0.5" wall A252 Welded 152 41 41 193 193 N/A - Rotary Drilled / Driven 17.5 13.375 72 L-80 BTC 5583 40 40 5623 3531 Lead: 715 bbls, 12.0 ppg Tail: 167 bbls 15.8 ppg Class G 12.25 9.625 47 P110 Hyd 563 15443 38 38 15481 7067 Tail: 132 bbis, 15.8 ppg Class G TOC: 13,981' MD / 6,546' TVD �-- - a o(J- Cc, P. S 6613 8.5 4.5 15.2 Pilo Hyd 563 6741 15381 7042 22122 7063 Slotted Liner- No Cement; 100' lap 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): N/A Perforation Depth TVD (ft): WA Hydraulic Fracture planned? Yes ❑ No ✓❑ 20. Attachments: Property Plat ✓❑ BOP Sketch ✓ Dulling Program ✓ Time v. Depth Plot Shallow Hazard Analysis Dive at Sketch ✓ Seabed Report Drifting Fluid Program ✓ 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Thomas McKay Authorized Name: Larry Burgess Contact Email: tom.mckavCdbluecrestenergy.com Authorized Tifle: Alaska Manager Contact Phone: 907-754-9566 Authorized Signature: Date: 11 -Oct -18 Commission Use Only Permit to Drill '7 �i // API Number. Permit Approval See cover letter for other Number. !�(/ %�D 50- �� �'' �-C/-��-_C Date: ` 1 requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, as hydrates, Other: L /i / Samples Yes No or gas contained in shales: Mud log Yes.. .- 35� �S ` 0 req'd: [_1 req'd: o HzS measures: Yes ❑ No Directional svy req' . es E440 Spacing exception req'd: Yes dNo ❑ Inclination -only svy req'd: Yes o Post initial injection MIT req'd: Yes D10 APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: r t l4 t I I '("o Submit permit is valid fdF �4� Inof� f rAtebf a �i g) Submit Form and p V 1R` I V H L pproval per 20 AAC 25.1005( q achments in Duplicate I 04 10-401 Revised 510147- `" lue)est Energy 3301 C Street, Suite 202, Anchorage, AK 99503 Thomas W. McKay, P.E. Phone: (907) 754-9566 Email: tom.mckay@bluecrestenergy.com October 11, 2018 Alaska Oil and Gas Conservation Commission 333 West 7`" Avenue, Suite 100 Anchorage, Alaska 99501 Cosmopolitan Project RE: Application for Permit to Drill: Horizontal Production Well H04-11-04 Fishbone Multilateral Producer Form 10-401; Fishbone Multilateral Well Design Dear Commissioners, BlueCrest Alaska Operating LLC hereby applies for a Permit to Drill for the onshore horizontal production well 1104-L04 — Fishbone Lateral Producer. This well will be drilled and completed using BlueCrest Rig #1. The planned spud date could be as early as 15 Nov 2018. 1-104-1-04 will be a multilateral producer, drilled as a "fishbone" style rib drilled off the mainbore up into the full section of reservoir present on this Lease. The 1-104-1-04 lateral well will be part of a grass roots producer drilled from the H04 slot. The H04 Fishbone Producer well will not be fracture stimulated but instead will rely on the seven (7) rib wellbores like 1-104-1-04 to drain the hydrocarbon fluids, etc. into the main bore which will be cased with a 4-1/2" slotted liner. The well will be completed with 3-1/2" upper completion tubing and lifted using gas lift as needed. Please find attached for the review of the Commission form 10-401, and the information required by 20 ACC 25.005 for this well. Please note that the eight (8) total Spacing Exceptions for this H04 well and its laterals have already been submitted to the AOGCC. Also note that seven (7) additional APD packages such as this one attached for 1-104-1-04 will be submitted for each well 'rib" numbered L01 through L07, which are proposed to be open hole sidetracks off the mainbore. As per AOGCC regulations, each rib requires its own unique name and APD. If you have any questions or require further information, please do not hesitate to contact Tom McKay at 907-754-9566 (office) or 907-350-9544 (cell). Sincerer Larry Burgess Alaska Manager BlueCrest Alaska Operating LLC Cosmopolitan Project H04 BlueCrest H04 Fishbone APD Package - Main Bore + Fishbone Lower Laterals Section Topic A Cover Letter B APD Table of Contents C Form 10-401 1 Well Name 2 Location Summary 3 BOPE Information 4-a Drilling Hazards Information 4-b Pressure Model Plot 4-c Drilling Hazards Summary 5 LOT/FIT Procedure 6 Casing & Cementing Program 7 Diverter System Information 8 Drilling Fluid Program 9 Abnormally Pressured Formation Information 10 Seismic Analysis 11 Seabed Condition Analysis 12 Evidence of Bonding 13 Proposed Drilling Program 14 Discussion of Mud & Cuttings Disposal and Annular Disposal 15 Attachments 15-1 Drilling Procedure - Proposed Drilling Program 15-1a Wellbore Schematic - Cross Sectional Color View 15-1b Wellbore Schematic - Excel Section Review 15-1c Wellbore Schematic - Visio Version 15-2 Directional Plan 15-3 Casing Design & Cement Volume Calculations 15-4 Formation Integrity & LOT Procedures 15-5 BOP & Choke Manifold Configuration 15-6 Wellhead & Tree Configuration 15-7 Diverter Configuration & Schematics 15-8 H04 Lease Map 15-9 H04 As -Built Surface Slot Location 15-10 H04 New Well Rig Elevation Form Well Identifier ISurface X Y IDepth 2149401.42 MD Legal Coordinates H04 (Pl) Surface Location 168812.804 2144623.035 2173' FSL, 1552' FEL, Sec. 2, T4S, R15W SM H04 (Pl) SCP 165349.46 2145687.06 -3353.43 5623.05 3143' FSL, 5044' FEL, Sec. 2, T4S, R15W SM H04 (131) ICP (Top of Production) 156564.79 2148421.8 -6889.98 15481 350' FSL, 3337' FEL, Sec. 33, T35, R15W SM H04 (Pl) TD 151037.26 2152075.44 -6886.54 22122.01 3847' FSL, 3680' FEL, Sec. 32, T3S, R15W SM -6466.66 18379.17 3451' FSL, 3058' FEL, Sec. 1796' FSL, 447' FEL, Sec. 32, T3S, R15W SM 1104-1-01 (131) KOP (Ton of Production) I 1S60R9 1111 71 dR6r,7 dd -rgrl ri irml Ar I c41' ca iQia cc c... » Toc o,r a cnn H04 -L01 (Pl) TD 155000.35 2149401.42 -6536.55 17413.75 3081' FSL, 2473' FEL, Sec. 1286' FSL, 4928' FEL, Sec 33, T3S, R15W SM H04 -L02 (P1) KOP (Top of Production) 155462.09 2149089.34 -6951.32 16777.86 2716' FSL, 1899' FEL, Sec. 987' FSL, 4458' FEL, Sec. 33, T3S, R15W SM 1-104-1-02 (P1) TD 154213.31 2149933.44 -6466.66 18379.17 3451' FSL, 3058' FEL, Sec. 1796' FSL, 447' FEL, Sec. 32, T3S, R15W SM 1-104-1-03 (Pl) KOP (Top of Production) 154774.06 2149555.27 -6951.58 17608.87 3141' FSL, 2569' FEL, Sec. 1433' FSL, 5158' FEL, Sec. 33, T3S, R15W SM 1104-1-03 (P1) TD 153496.35 2150416.47 -6436.55 19250.37 2258' FSL, 1177' FEL, Sec. 32, T3S, R15W SM 32, T3S, R15W SM 1104-1-04 (Pl) KOP (Top of Production) 154113.81 2149999.68 -6951.51 18404.82 1859' FSL, 548' FEL, Sec. 32, T3S, R15W SM 1104-1-04 (Pl) TD 152833.34 2150864.47 -6436.55 20050.65 2687' FSL, 1852' FEL, Sec. 32, T3S, R15W SM 1-104-1-05 (131) KOP (Top of Production) 153450.871 2150447.6 -6951.55 19204.97 2288' FSL, 1223' FEL, Sec. 32, T3S, R15W SM nuv-wD krli flu 15LLL3.Ly L151L/5.44 -b4bb.b3 20779.65 3081' FSL, 2473' FEL, Sec. 32, T35, R15W SM 1-104-1-06 (Pl) KOP (Top of Production) 152787.44 2150894.87 -6951.55 20005.16 2716' FSL, 1899' FEL, Sec. 32, T3S, R15W SM 1104-1-06 (131) TD 151648.29 2151662.49 -6516.66 21461.68 3451' FSL, 3058' FEL, Sec. 32, T3S, R15W SM 1-104-1-07 (P1) KOP (Top of Production) 152129.13 2151338.82 -6951.54 20799.25 3141' FSL, 2569' FEL, Sec. 32, T3S, R15W SM 1-104-1-07 (Pl) TD 1 151145.251 2152002.44 -6606.64 22048.92 3777' FSL, 3570' FEL, Sec. 32, T3S, R15W SM Wellbore Nearest Producing Well Distance To Nearest Producer (ft) Nearest Property Line Distance (ft) H04 Hansen 1AL1 2590 Y01664 543 H04 -L01 Hansen 1AL1 2590 Y01664 4866 H04 -L02 Hansen 1ALl 2590 Y01664 4010 H04 -L03 Hansen 1AL1 2647 Y01664 3216 H04 -L04 Hansen 1AL1 2842 Y01664 2493 H04 -L05 Hansen 1AL1 2964 Y01664 1831 H04 -L06 Hansen 1AL1 2955 Y01664 1209 H04 -L07 Hansen 1AL1 2951 Y01664 660 nue est Energy Application for Permit to Drill Document Cosmopolitan Project H04-10410-401 APD Discussion Sections Horizontal Multilateral Producer H04 — L04 Fishbone Lateral Table of Contents 1. Well Name...................................................................................................................3 Requirementsof 20 AAC 25.005(f).............................................................................................................. 3 2. Location Summary........................................................................................................3 Requirements of 20 AAC 25.005(c)(2).......................................................................................................... 3 Requirements of 20 AAC 25.050(b).............................................................................................................. 3 3. Blowout Prevention Equipment Information..................................................................4 Requirements of 20 AAC 25.005(c)(3).......................................................................................................... 4 4. Drilling Hazards Information.........................................................................................4 Requirements of 20 AAC 25.005 (c)(4).........................................................................................................4 DrillingHazards Summary: ................................................................... ....... — .................................. .... 6 5. Procedure for Conducting Formation Integrity Tests.......................................................7 Requirements of 20 AAC 25.005 (c)(5)......................................................................................................... 7 6. Casing and Cementing Program.....................................................................................7 Requirements of 20 AAC 25.005(c)(6).......................................................................................................... 7 7. Diverter System Information .........................................................................................7 Requirements of 20 AAC 25.005(c)(7).......................................................................................................... 7 B. Drilling Fluid Program...................................................................................................8 Requirements of 20 AAC 25.005(c)(8).......................................................................................................... 8 9. Abnormally Pressured Formation Information................................................................8 Requirements of 20 AAC 25.005 (c)(9)......................................................................................................... 8 10. Seismic Analysis...........................................................................................................8 Requirements of 20AAC25.005 (c)(10).......................................................................................................8 11. Seabed Condition Analysis............................................................................................8 Requirements of 20 AAC 25.005 (c)(11)....................................................................................................... 8 12. Evidence of Bonding.....................................................................................................9 Requirements of 20 AAC 25.005 (c)(12)....................................................................................................... 9 13. Proposed Drilling Program............................................................................................9 Requirements of 20 AAC 25.005 (c)(13)....................................................................................................... 9 11Page H04 -L04 10-401 APD Discussion Sections lNest Energy Cosmopolitan Project H04 -L04 10-401 APD Discussion Sections 14. Discussion of Mud and Cuttings Disposal and Annular Disposal.......................................9 Requirements of 20 AAC 25.005 (c)(14)....................................................................................................... 9 15. Attachments.................................................................................. Attachment 1 Drilling Procedure............................................................................. Attachment 2 Directional Plan............................................................................. Attachment 3 Casing Design Calculations............................................................. Attachment 4 Formation Integrity And Leak Off Test Procedure .............................. Attachment 5 BOP & Choke Manifold Configuration .............................................. Attachment 6 Wellhead & Tree Configuration....................................................... Attachment 7 Diverter Schematics....................................................................... Attachment8 Lease Map............................................................................................ Attachment 9 As -Built Slot Survey............................................................................... Attachment 10 New Well Elevation Farm................................................................... ..................................... ........................................ 9 ........................................ 9 ................... I ....... ............. 9 21Page H04 -L04 10-401 APD Discussion Sections lst Energy Cosmopolitan Project F104-1-0410-401 APD Discussion Sections 1. Well Name Requirements of 20 AAC 25.005 (f) Each well must be identified by a unique name designated by the operator and a unique API number assigned by the commission under 10 AAC 25.040(6). For a well with multiple well branches, each branch must similarly be identified by a unique name and API number by adding a suffix to the name designated for the well by the operator and to the number assigned to the well by the commission. Well Name: 1-104-1-04 Fishbone Lateral To include the 1-104-1-04 fishbone lateral drilling and completion only. NOTE: This well will be proposed as a "fishbone" design with a mainbore named as H04, and seven (7) open hole "barefoot" laterals drilled by open hole sidetrack from the mainbore to be named as: 1104-1-01, 1104-1-02, 1-104-1-03, H04 - L04, 1-104-1-05, 1-104-1-06, and 1-104-1-07. The seven (7) laterals or "ribs" will be drilled upward into all the Hemlock and Starichkof reservoir layers at an inclination of 115 degrees, and each will have its own APD package to be submitted. This particular package (1-104-1-04) is for the H04-1-04 drilling and completion operations only. 2. Location Summary Requirements of 20 AAC 25.005(c)(2) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (1) a plat identifying the property and the property's owners and showing (A)the coordinates of the proposed location of the well at the surface, at the top of each objective formation, and at total depth, referenced to governmental section lines. (B) the coordinates of the proposed location of the well at the surface, referenced to the state plane coordinate system for this state as maintained by the National Geodetic Survey in the National Oceanic and Atmospheric Administration; (C) the proposed depth of the well at the top of each objective formation and at total depth; (D) other information required by 10 AA 25.050(6); Location at Top of Productive Interval Location at Surface 2173' FSL, 1552' FEL, Sec. 02, T4S, R15W SM Measured Depth, RKB: 18,405' ASP Zone 4 NAD 27 Coordinates Northing: 2,144,623.035' Easting: 168,812.804' RKB Elevation 180.50'AMSL Pad Elevation 145.25'AMSL Location at Top of Productive Interval 1859' FSL, 548' FEL, Sec. 32, T3S, R15W SM ASPZone4 NAD27Coordinates Northing: 2,149,999.68' Easting: 154,113.81' Measured Depth, RKB: 18,405' Total Vertical Depth, RKB: 7,128' Total Vertical Depth, SS: 6,952' Location at Total Depth 2687' FSL, 1852' FEL, Sec. 32, T3S, R15W SM ASP Zone 4 NAD 27 Coordinates Northing: 2,150,864.47' Easting: 152,833.34' Measured Depth, RKB 1 20,051' Total Vertical Depth, RKB: 6,613' ' Total Vertical Depth, SS: 6,437' Requirements of 20 AAC 25.050(b) If a well is to be intentionally deviated, the application for a Permit to Drill (Form 10-401) must (1) include a plat, drown to a suitable scale, showing the path of the proposed wellbore, including all adjacent wellbores within 100 feet of any portion of the proposed well, Please see Attachment 2: Directional Plan Please see Attachments 7-8: Diverter Schematics / Lease Map (2) for all wells within 200 feet of the proposed wellbore (A) list the names of the operators of those wells, to the extent that those names are known or discoverable in public records, and show that each named operator has been furnished o copy of the application by certified mail; or (B) state that the applicant is the only affected owner. The Applicant is the only affected owner. 3 1 P a g a H04 -L04 10-401 APO Discussion Sections Ist Energy Cosmopolitan Project H04-104 10-401 APD Discussion Sections 3. Blowout Prevention Equipment Information Requirements of 20 AAC 25.005(c)(3) application fora Permit to Drill must be accompanied by each of thefollowing items, except for an item already on file with the commission and identified in the application: (3) a diagram and description of the blowout prevention equipment (BOPE) as required by 20AAC 25.035, 20AAC25.036 or20AAC25.037, as applicable; Please see Attachment 5: BOP & Choke Manifold Configuration 4. Drilling Hazards Information Requirements of 20 AAC 25.005 (c)(4) An application for a Permit to Drill mb v v, j , ompanied by each of the following items, except for on item already on file with the commission and identified in the application: (4) information on drilling hazards, including (A) the maximum downhole pressure that may be encountered, criteria used to determine it, and maximum potential surface pressure based on a methane gradient,- The radient; The expected reservoir pressure in the Starichkof / Hemlock Sands is 0.472 psi/ft, or 9.07 ppg EMW at 6,951' TVDss taken per MDT's on Cosmopolitan 1. The maximum known pressure in the upper Kenai sands is 9.66 ppg @ 3,841' TVDss per MDT's taken on Cosmopolitan 1. To be conservative, the highest pressure gradient of 9.66 ppg or 0.502 psi/ft will be used to determine MPSP at the production interval of 6,900' TVDss. The maximum potential surface pressure (MPSP) based on the above maximum pressure gradient, a methane gradient (0.10), and the planned vertical depth of the Starichkof / Hemlock formation is: MPSP=(6,900TVDss) (0.502 - 0.1 psi/ft) =2,774 psi MPSP=(7,070TVD) (0.502 - 0.1 psi/ft) =2,842 psi (using TVD instead of TVDss for this calculation) MAX BHP=(7,070TVD) (0.502 psi/ft) =3,549 psi (using TVD instead of TVDss for this calculation) (B) data on potential gas zones, The Sterling, Beluga and Tyonek sands within the Kenai group have been known to contain gas. The intermediate section will be drilled with a minimum mud weight of 10.5 ppg, the maximum known pressure through these sections is 9.66 ppg J @ 3,841' TVDss per MDT's taken on Cosmopolitan 1. (C) data concerning potential causes of hole problems such as abnormally geo-pressured strata, lost circulation zones, and zones that have a propensity for differential sticking, Please see the Drilling Hazards Overview below. 41 Pa g H04-1-0410-401 APD Discussion Sections nue st Energy iI 201 Ti Cosmopolitan Project 'CD4 -L04 10-401 APD Discussion Sections Pressure Model (EMW) wl �a A(V 2.44 ).01 8 9 10 11 12 13 14 15 16 17 18 19 20 EMW (PPG) —Lithostatic Stress • MDT Data —Frac Gradient—Moving Average—Planned Mud Weight 5 1 P a g e FG4-1 04 10 101 APD Discussion Sections lNeSr Energy Drilling Hazards Summary: 17-'/=" Hole Section / 13-%" Casing Cosmopolitan Project 1-104-104 10-401 APD Discussion Sections Event Risk Level Mitigation Strategy Clay Balling Maintain planned mud parameters, Increase mud weight, use Lost Circulation Low weighted sweeps, reduce fluid viscosity, control ROP. Abnormal Pressure in LCM pills, lost circulation material. Surface Formations Low Diverter drills, increased mud weight. Directional Control low BHA design, on -sight geologic review, avoid "drilling the line". Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use Tight Hole of low density cement slurries, control running speeds. J v�/ 12-%" Hole Section / 9-%" Casing (`jp 14? Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost Circulation Low circulating density (ECD) monitoring, mud rheology, Pre -planned LCM pills, lost circulation material. Hole swabbing on Reduced trip speeds, mud properties, proper hole filling, real time trips low equivalent circulating density (ECD) monitoring, weighted sweeps. Sloughing Coals, Low Increased mud density and fluid composition according to plan, Tight Hole controlled trip speeds, ECD monitoring, optimized hydraulics for Pressure Low hole cleaning. Abnormal Reservoir Low H2S drills, detection systems, alarms, standard well control Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide Gas low HZS drills, detection systems, alarms, standard well control practices, mud scavengers. 8-V" Hole Section / 5-f" Slotted Liner Event Risk Level Mitigation Strategy Fluid density according to plan, reduced pump rates, reduced trip Lost Circulation Low speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material. Hole swabbing on Reduced trip speeds, mud properties, proper hole filling, real time trips Low equivalent circulating density (ECD) monitoring, weighted sweeps. Directional Control Low BHA design, on -sight geologic review. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide Gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers. 61Page H04-1-0410-401 APD Discussion Sections lue(.fest Energy Cosmopolitan Project H04-Lo4 10-401 APD Discussion Sections 5. Procedure for Conducting Formation Integrity Tests Requirements of 20 AAC25.005 (c)(5) i to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the oppi,cotion: (5) a description of the procedure for conducting formation integrity tests, as required under 20 AAC 25.030(f); Please see Attachment 4: Formation Integrity and Leak Off Test Procedure — N/A for Fishbone Open Hole Laterals 6. Casing and Cementing Program Requirements of 20 AAC 25.005(c)(6) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (6) a complete proposed casing and cementing program as required by 10 AAC 25.030, and a description of any slotted liner, pre -perforated liner, or screen to be installed; NOTE: INFORMATION IN THIS SECTION REFERS TO THE H04 MAINBORE ONLY Casing and Cementing Program See also Attachment 4: Cement Volume Calculation Summary Csg/Tbg Hole Sire Weight Weight Grade Conn Length Top MD/TVD Btm MD/TVD Cement Program OD (in) (in) ng (fu (ft) 20" N/A .5001 A525 Weld 152' 41'/41' 193'/ 193' N/A Wal 5,623'/ 882 TOTAL BBLS 13-3/8' 17-1/2" 72 L-80 BTC 5,583' 40'/40' 3,531' LEAD: 572 bbls 12.00 ppg Kenai Lead "G" TAIL: 167 bbls 15.8 ppg Class 9-5/8" 12-1/4" 47 P-110 Hydril563 15,443' 38'/38' 15,481'/ 132 TOTAL BBLS "G" 7,067' TAIL: 132 bbls 15.8 ppg Class TOC: 13,981' MD/ 6,546' TVD No cement required 4-1/2" 8-1/2" 15.2 P-110 Hydri1563 6,741' 15,381'/ 22,122'/ Slotted liner completion 7,042' 7,063' 100' liner lap Please see Attachment 3: Casing Design Calculations NOTE: Due to the high inclination at the 9-5/8" intermediate shoe, a tractor would be required to run a CBL/USIT log on this shoe. In addition, since the H04 well is not to be hydraulically fracture stimulated, it is requested that the AOGCC waive the CBL /USIT requirement on the 9-5/8" cement job on the H04 well. 7. Diverter System Information Requirements of 20 AAC 25.005(c)(7) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (7) a diagram and description of the diverter system as required by 20 AA 25.035, unless this requirement is waived by the commission under 20 AAC 25.035(h)(2), Please see Attachment 5: BOP and Choke Manifold Configuration. NOTE: A request and justification to waive the requirement for a diverter system while drilling the H04 surface section will be submitted under a separate cover letter. 71Page H04 -L0410-401 APD Discussion Sections iilt�r•r., .. FW r"' Cosmopolitan Project 1104-1-04_10-401 APD Discussion Sections 8. Drilling Fluid Program Requirements of 20 AAC 25.005(c)(8) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (8) o drilling fluid program, including a diagram and description of the drilling fluid system, as required by 20 AAC 15.033; Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. Drilling will be done with drilling fluids having the following properties over the listed intervals in the following Table. NOTE: the base case drilling fluid program is to drill the surface section with a fresh water conventional barite based system. The intermediate section will be drilled with a oil based conventional barite mud system. However, based on the results seen in the H14 and H12 flowback production test histories, it is planned to drill the H04 production section using a solids free oil based mud system with no barite, using only salt and calcium carbonate for weighting and bridging material, in order to minimize near wellbore formation damage in the reservoir section. Since the well design does not allow for any type of well stimulation or acid clean up after completion, it is vital for well productivity to drill the reservoir with as light a mud weight as possible, and with as few solids as possible, in an effort to minimize formation damage. Parameter Surface Intermediate Production Type WBM OBM OEM Name Spud Mud Versa Pro Versa Pro Density (ppg) 9.8 10.5 8.8-9.7 ✓ Oil:Water Ratio N/A 80:20 75:25 6/3 RPM 17-20 12-14 8-10 PV (Ibs/300ft2) <28 <28 API Fluid Loss (cc/30min) NC HTHP Fluid Loss (cc/30min) <5.0 <5.0 Electric Stability (mlVolts) >600 >600 pH 8.5-9.5 Chlorides <2,000 9. Abnormally Pressured Formation Information Requirements of 20 AAC 25.005 (c)(9) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (9) for an exploratory or stratigraphic test well, a tabulation setting out the depths of predicted abnormally geo-pressured strata as required by 10 AAC25.033(f); Not applicable: Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis Requirements of 20 AAC 25.005 (c)(10) An application for o Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (SO) for an exploratory or stratigraphic test well, a seismic refraction or reflection analysis as required by 20 AAC 25.061(0); Not applicable: Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis Requirements of 20 AAC 25.005 (c)(11) An application for a Permit to Drill must be accompanied by each of the following items, except for an item already on file with the commission and identified in the application: (11) for a well drilled from on offshore platform, mobile bottom -founded structure, jack-up rig, or floating drilling vessel, on analysis of seabed conditions as required by 20AAC 25.061(b); Not applicable: Application is not for an offshore well. alPage H04-104 10-401 APD Discussion Sections lC lst Energy Cosmopolitan Project H04 -L04 10-401 APD Discussion Sections 12. Evidence of Bonding Requirements of 20 AAC 25.005 (c)(12) An application for a Permit to Drill must be accompanied by each of the following items, except for on item already on file with the commission and identified in the application: (12) evidence showing that the requirements of 20 AAC 25.015 (Bonding)have been met; Evidence of bonding for BlueCrest Alaska Operating LLC is on file with the Commission. 13. Proposed Drilling Program Requirements of 20 AAC 15.005 (c)(13) A copy of the proposed drilling program; the drilling program must indicate if a well is proposed for hydraulic fracturing as defined in 20AAC 25.183(m); to seek approval to perform hydraulic fracturing, a person must make a separate request by submitting an Application for Sundry Approvals (Form 10- 403) D403) with the information required under 20 AAC 25.280 and 20 AAC 25.283; (13) a copy of the proposed drilling program; Please refer to Attachment 1— Drilling Procedure. Note: The H04 well will NOT be hydraulically stimulated. 14. Discussion of Mud and Cuttings Disposal and Annular Disposal Requirements of 20 AAC 25.005 (c)(14) An application for a Permit to Drill must be e,_. jmpamed by each of the following items, except for an item already on file with the commission and identified in the application: (14) a general description of how the operator plans to dispose of drilling mud and cuttings and a statement of whether the operator intends to request authorization under 20 AAC 25.080 for an annular disposal operation in the well.; Solid and liquid wastes generated during the drilling process will be disposed of at Hilcorp Alaska, LLC's Kenai Gas Field (KFG) Grind & Injection (G&I) Facility or AIMM Technologies' (hydrokinetics) facility in Kenai. Dried water base cuttings from the surface section are planned to be properly disposed of in a local landfill after being tested using the filter paint test. No annular disposal is planned for this well. 15. Attachments Attachment 1 Drilling Procedure with Wellbore Schematics Attachment 2 Directional Plan Attachment 3 Casing Design and Cement Volume Calculations Attachment 4 Formation Integrity And Leak Off Test Procedure Attachment 5 BOP & Choke Manifold Configuration Attachment 6 Wellhead & Tree Configuration Attachment 7 Diverter Schematics Attachment 8 Lease Map Attachment 9 As Built Slot Survey Attachment 10 New Well Elevation Form 9lPage H04-0410-401 APD Discussion Sections DI UCNest Energy Attachment 1 Cosmopolitan Project H04 -L04 10-401 Fishbone APD Attachments H04 -L04 10-401 Fishbone APD Attachments H04 Fishbone Multilateral Well — Skeleton Procedure for Drilling Reservoir Section The seven (7) ribs of the fishbone production section will be drilled in the following sequence using a 8.8-9.4 ppg low -solids CBM starting mud weight: o Drill the first fishbone rib "LO3" up into the Hemlock and Starichkof pay sands as per the APD and directional plan for H12-LO1. o Circulate cuttings to a point past the BHA. o Backream LO3 rib back to mainbore. Circulate hole clean. o Once back in the mainbore, position the bit and RSS BHA at the open hole sidetrack depth for L02 as directed by the Operations Geologist. o Trench and open hole sidetrack the mainbore to the low side and drill ahead to the kickoff point for the L02 rib. o Repeat the LO3 drilling procedure above to drill the L02 rib, and the subsequent ribs L03, L04, LOS, L06 and L07. o The last rib could be designated as LOS which will simply be a continuation to TD of the mainbore to be drilled under the H04 Mainbore APD. o NOTE: more than one bit run is expected to be required to drill the multiple ribs, and the two-week AOGCC BOP test frequency will also need to be incorporated into the Daily Operations Plan. o Drill the H04 mainbore to TD, and circulate the well clean. o Backream to the 9-5/8" shoe. o Circulate hole clean and cap well as required; prepare to POOH for the 4-1/2" slotted liner. o Backream / POOH on elevators, and lay down BHA. Rig up to run 4-1/2" slotted liner lower completion. Rev 0 T. McKay 08 Oct 2018 2400 3200 4000 4800 o= o- 81 4: 8: 4800 5600 6400, 7200 8000 8800 9800 10400. 11200 .o 5800 6600 T--,7-,2,00, '. r-- 8000 6800 9800 10400 0 500 1000 1500 2000 25008US 1:12500 ypJ O J O O 11200 Last Updated: TWM, 09 Oct 2018 ^193' MD/TVD Drilled In Bit: 17-1/2" PDC Bit RSS: PDX6 MWD: PowerPUlse LWD: arcVISION(GR/RES) 17-1/2" Open Hole 5,623' MD/ 3,531' TVD ' Bit: 12-1/4" PDC RSS: Xceed 675 MWD: PowerPulse LWD: arcVISION(GR/RES) 15,481' MD / 7,0677V Bit: 8-1/2" PDC RSS: Xceed 675 MWD: Telescope LWD: GeoSphere adnVISION LLL 12-1/4" Open Hole H04 Fishbone Production Well (Main Bore / Lower Lateral / Starichkof / Hemlock Primary Target) --------------- 4 3-1/2" Production Tubing to Surface GLM's / SSSV / DH Gauges / CIM 12.0 ppg Lead 715 bbls WBM 25% Excess 9.8-10.0 ppg Spud Mud Top of Tail 4,623' MD 8.8-9.7 ppg VersaPro 15.8 ppg Class G Tail Slotted Liner 167 bbls 25% Excess Incl 69 deg 41/2" 15.2# P110 H563 Slotted Liner Azim 286 de¢ TOC @ 13,981' MD 15.8 ppg Class G 132 bbls 50% Excess OBM 10.5 ppg VersaPro Liner Hgr & Liner Top Packer 9-5/8" 47# P330 H563 I I I I I I Incl 77 deg Azim 291 deg OBM 8-1 2 1 1 Un -cemented 8.8-9.7 ppg VersaPro Open Hole I I Slotted Liner No Frac's 41/2" 15.2# P110 H563 Slotted Liner Un -Cemented Slotted Liner Completion Max Incl 115 deg in Mainbore Azim 302.4 dee T. McKay, 285ept2018 20" Conductor to be set @ 152' BGL 13-3/8" 72# L80 BTC @ 5623' MD 3-W 9.3# IBT-MOD Production Tubing 4-%" x 9.5/8„ Liner Hanger & Liner Top Packer 7 H04 Lower Lateral Completion with Slotted Liner in Mainbore and Seven 9-5/8"47.0/53.5# N80/P110 H563 @ 15481' MD (7) Open Hole Fishbone Ribs Ilue est Energy Fishbone ribs are 8-%" open holes spaced approx every 800' with 4-%" slotted liner run in the mainbore after the seven ribs are drilled; ribs are drilled in order from L01 to L07 using open hole sidetracks to initiate each rib; ribs penetrate all layers of Starichkof and Hemlock pay sands LO1 L02 L03 l L04 LOS LO6 L07 4-36" 15.2# H563 Slotted Liner @ 22122' MD 131 ueNest Energy Attachment 2: Cosmopolitan Project H04-10410-401 Fishbone APD Attachments H04 -L04 10-401 Fishbone APD Attachments St H04-1.04 (P1) Proposal Geodetic Report Schtwiflivger Energy (Def Plan) u'. BlusCurst VeM:M Section Azimuth: 291 000 ° (True NOM) ' Ceemowliten UnitI u 014.050.20500,0.0% 15 PIiten Pad/H DLS R8 Exclusion Zona GougedTINOMing on. EaotlrM H6410ibofl(vStuVl3eloOdgn: GraElevtio u 0Aole MSLE ova Ifll W231.0��s Magnotic Declared.: 14.510- ley Name: HG4-L04(Pt) Total Gnovity Fluid Shonglh: 101.2613mgn(9.80065 Snood) ay Date: September 24, 2018 Grevfly Modal: DO% I AHD 10011 ERD Rate: 143,021 '117287A78 ft 16.84212.425 Total Magnetic Field Stmn9M: 55009.179 uT dinote Forenoon. System: MD27 Alaska State Plane, Zone W, US Feet Ma9MUNDIPAngie: 72.874° Uon Lot l Lang: N59° 51' 29.73683', W 151°40'5.85554' Oeclinatlon Dab: December 01, 2018 Um Grid WE YIE: N 2144623.035 WS, E 168012.8040US Magnetic Declination Model: HDGM 2018 GrldCwrvergenro Aogls: -1.5582° NOM RorbnonOe: True Nouh Seale Factor: 100002484 Grid Convergence Used: 00000' Ion I Patch: 2.10.514 0 Total Cwr Mao Nord Trus NoM: 14.5103 ° comments MO Incl Azlm True NDSS TVD VSEC N9 EW TF DLS Dino Exclusion Lone Exclusion Zona GougedTINOMing EaotlrM IRI 1°I 11I Ifll (RI IRI Ifll Ifll 1°I Index (°naoR) Dlmaalry Index ANrt Anele (nTl (nus) (Rus) RTE 0.00 0.00 000 -180.50 000 000 000 em 28W WA 0.00 ITA3 16222.50 2144623.04 16881280 100.00 000 283.00 -00.50 100.00 0.00 Gm 0.00 283M 000 0.00 17.13 18222.]6 21 21 16881200 200.00 0.00 283.00 19.50 20000 0.00 000 000 283M 0.00 0.00 17.13 16222.95 21"62304 16881280 300.00 0.00 20300 119.50 300.00 000 0.00 000 283M 0.00 000 17.13 1622313 21"62304 1081280 Cry 1/100 400.00 0.00 283.00 219.50 4W(10 0.0 0.00 000 283M 0.00 0.00 17.13 16223.32 2144623.04ifi881260 500.00 1.00 28300 319.49 49999 ON 0.20 -085 283M top 0.00 17.18 162)3.61 214462325 16881196 Cry 27100 600.00 200 20.0 419.46 59996 3.46 0)9 -340 283M 1.00 0.04 1729 16375.31 21"(2391168809.43 70000 4.0) 283.00 51932 699.82 8.64 1m -@.W 283M 2.00 1.54 17.67 16728.04 214462523 1:880036 Cry 2.9100 800.00 800 28300 618.93 )9943 17.27 392 -16.99 2.76R 2.00 202 1026 17267.79 2144627,42 168795.92 90000 8.50 283.82 718.12 1190.62 29.78 6.86 -29.26 1.9511 2.50 2.41 19.15 18076.92 2144630.69 16878374 100.0 11.00 284.26 81867 9WA7 46.50 10.98 4568 1.51R 250 2.71 20.30 19117.41 214463525 168767.44 1100.00 1350 264.55 914.39 1094.89 (1 16.26 -@622 1.24R 2.50 2.97 2167 20346.61 2144641.09 168747.04 1200.00 16.00 28474 1011.09 1191.59 92.95 22.70 -90.85 105R 2.50 3.18 23.22 21724.07 2144818.19 168722.60 130000 18W 284.89 110669 1287,09 122.42 30.28 -119.51 OSHR 2W 3.35 24.91 23213.96 2144656.55 168694.16 140000 2099 28500 1200.70 1331.20 15601 30.99 -152.14 0.81R 2.50 3.52 26.73 24785.77 2144666.15 160661.)) 1500.00 2349 28508 1293.25 103]5 VOSS 48.82 -100.70 072R 250 3.67 28.84 2641405 2144876.96 160625.50 1600.00 25.99 285.16 1384.06 1564.56 235.30 59.73 -mS11 0.65R 2.50 380 30.83 28077,70 2144668.90 16850540 170000 28.19 28522 1472.96 1653.46 280.84 71.73 -27328 0.61R 250 392 32.60 2975922 214002.17 160541.57 1800.00 WAS 285.27 1559.78 174028 330.19 84.77 -321.15 O.WR 2.50 003 34]9 31444.00 2144716.$1 168494.07 1900.00 33.49 26531 1644.35 1824.85 383.28 98.84 -372.61 0.62R 250 CIS 36.94 3311971 2144731.97 168443.02 2000.00 3599 285.35 1726.51 1907.01 439.99 11391 427.56 049R 2.W 412 39.12 34775.83 214048.53 10300.49 2100.00 30.49 285.39 1806.11 198661 600.21 129.95 485.92 0.4611 2.50 4.31 41.34 36403.28 214006.15 160330.59 2200.00 40.99 285.42 1883.00 2063.50 563.04 148.93 -50.55 04411 2.50 4.39 43.0 37994.16 214084.80 168269.44 23M 4349 285" 1957.02 2137,52 630.74 164.81 -612.35 0.42R 2.W 4.47 45.84 39541.50 2144804.44 168205.15 240.00 4599 28547 2028.04 220854 700.00 183.57 £80.19 GAR 2.W 4.55 48.12 41039.09 2144825.04 168137.84 250.0 40.49 28549 205.92 2276.42 773.80 20.17 -7W.95 0.39R 2.W 4.62 W.42 42401.38 2144816.56 1684" 1 2600.00 MISS 285.52 2160.54 2311.04 049.04 223.57 -024.48 0.37R 2.50 4.68 52.73 43863.30 214486895 16799469 270.0 5349 285.54 2221.76 2402.26 928.54 2447n -900.65 036R 2.W 415 0,05 45180.57 2144892.17 167919.12 280.0 55.99 285.55 227948 24W.98 109.82 266.61 -979.32 035it 2.W 481 57.39 46420.83 2144916.19 167841.0 290.0 5049 285.57 2333.59 2514.09 103.53 289.18 -100.32 064R 2.50 487 5913 0604.46 2144940.94 16n60.71 3000.0 60.99 285.59 2383.97 2564.0 1179.51 31237 -1143.52 0.33% 250 4.93 6208 48701.05 21091HIA0 1676)8.1) 31W,W 6349 285.61 2430.51 261t04 1267.61 336.17 -1228.75 0.32R 2.50 4.90 64.43 49724.55 2144992 W 16750.62 320000 65.99 285.62 20320 2653.70 1357.64 maw -1315.85 0.32R 2.50 504 66.79 50663.19 21401920 167507.22 3300.0 66.49 285,6,1 2511.88 2692.30 1449.45 38534 -1404.65 0.318 2W 5.0 HAS 51517.45 2145046.44 167419.12 End Cry 3314.37 68.85 285.64 2517.11 2697.61 146218 38895 -1417.51 HIS 2.50 50 6SW 51633.18 214WW40 167406.33 340nm S8.0 285.64 2518.00 2720.50 1542.29 410A8 -149444 HIS 0.0 5.12 69.50 5163369 21407401 167330.50 3W1100 OAS 285.64 258408 2764.58 1SSSA4 43562 -1584.26 HIS 0.0 5.16 69.50 51634.29 2145101.0 167240.94 3500.00 68.85 285.64 2620.15 2800.65 17280 460.76 -1674.07 HS 000 5.19 69.50 51131 2145129.16 167151.84 370.00 6885 28864 265023 2836]3 1820.86 485.90 -1763.88 HS 00 5.22 69.W 51635.49 214515073 167062,74 3800.00 6885 285.64 2692.31 2872.81 1913.72 511.04 48010 HS 0.0 5.24 60.W 51636.0 2145184.30 16697365 3900.00 68.85 28564 2728.38 2900.88 200.57 536.18 -1943.51 HS 000 527 69.50 51636.0 2145211.80 166884.55 4(0.00 6885 28564 2764.46 2944.96 2099.43 561.32 -203132 HS 00 530 6SW 51637,28 2145239.45 166795AS 4100.00 68.85 28564 2800.54 2981.04 2192.29 506.46 -2123.14 HS 0.00 532 69.50 $1637.87 2145267.0 1667035 4200 68.85 28564 2836.61 3017,11 228515 61160 321295 HS 0.00 531 69.50 5163847 2145294.59 16661725 4300 68.85 285.64 2872 W 300.19 2378.00 63074 -230.77 HIS O.0 5.36 69.50 5163907 2145322.17 166528.15 4400.00 68,85 205.64 29D0,77 3089.27 2470.86 661.88 -2392.58 HS 0.00 5.39 Sam 51639.66 2145319,74 16643905 450.0 60.85 28564 2 .84 3125.34 256372 687.0 -2482.39 HIS 0.00 5.41 WS) 51640.26 2145077.31 166349.95 460.0 60.85 285.64 2980.92 3161 A2 n%.W 712.16 -2572.21 HS 0.00 5.43 69W 5164096 2145104.89 166280.88 Cosmopolitan UniACosmoplitan Pao\H75-P2\H75-P2\H15-P2 (Pi) Drilling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:23 PIA Pagel of 4 Cam�Ms MD Incl gzim True NDSB ND VSEL NS EW Dlreclienal Excluclon Zone Excluslon2one GeoMp TI Na(W E(WS) (ftl (% (% Iftl Iftj lftl IN (ft) (°) 0 0DLSM) (°I100ft) OH0cu6y Index Alart An91e (n7,) IftGS) (ftGS) 4700.00 68.05 205.64 3017.00 319750 274943 MW -2682.02 H6 0.00 545 69M 51MIA5 2145432.46 166171.76 4000.00 68.65 28564 3053.07 3233.57 2842.29 762.44 -2751.83 HS 0.00 547 69M 51642.05 2145460.03 166082.68 4900.00 60.85 285.64 3089.15 326965 2935.15 78757 -2841.65 HS 0.00 5.48 69.50 51642.64 2145487.61 165993.56 2900.00 60.85 285.64 3125.23 330573 3028.00 812.71 -2931.46 HS 0.00 5.50 69.50 5164324 214%15.18 165904.46 5100.00 68.85 28564 3161.30 3341.80 3120.86 837.85 3021.27 HS 0.00 5.52 69.50 51643.84 214554275 165615.36 5200.00 68.85 285.64 3197.30 3377.88 3213]2 662.99 -3111.09 HS 0.00 5.53 69.M 51644.43 2145570.33 18572626 530000 68.85 28564 3233.46 341396 3306.50 888.13 3200.90 HS 0.00 5.55 69.50 51645.03 2145597.90 165637.16 54W.W "As 285.64 326953 3450.03 3399A3 91327 329071 HS 0.00 5.57 69.50 51645.62 2145625.47 165548.06 Upper Tv S19.31 W85 28584 327650 345700 341737 91613 330808 HS 0.00 557 69.50 5164574 2145830,80 165530.88 55W.W 68.85 285.84 3305.61 3486.11 3492.29 SWA1 -338053 HS 0.08 5.50 69.50 51646.22 2145653.05 165458.97 MOO.% 68.85 28564 3341.69 3522.19 3585.15 96355 3470.34 HS 0.00 5.60 69.50 5164682 2145880.62 1606987 133R'Cp 5623.05 6685 285.84 MWOO 3530.50 300655 96935 3491.04 HS 0.00 560 8950 51646.95 214568697 185349.33 57W.W 085 285.64 3377.76 3550.26 3678.01 Mass 3560.16 HS 0.00 5.61 69.50 5160.41 2145700.19 165280.77 5800.00 68.85 285.64 341384 3594.34 MOM 1013.83 3649.97 HS O.W 5.62 69.50 51648.01 214573577 165191.87 SWOM 0,85 285.64 3449.92 3630.2 3863.72 1038.97 373978 HS 0.00 5.84 69.50 5164860 2145763.34 165102.57 6000.00 68.85 28564 348599 3666.49 395658 1064.11 -3029.60 HS 0.00 565 89.90 5164920 2145790.91 165013.47 6100.00 68,85 285.64 3522.07 3702.57 404944 1089,25 391941 HS 0.00 566 69.50 51649.79 2145818.49 164924.37 6200.90 6885 28564 3550.15 3738.65 4142.29 1114.39 4009.22 HS 000 5.68 69.50 51650.39 2145846.06 164835.27 6300.00 68.85 28564 3594.22 3774.72 423515 1139.0 4099.04 HS 0.00 5.69 69.50 $1650.98 2145873.63 16046.18 UTon D 017.13 6885 28564 3600.40 378DW 4251.05 1143.84 4114.42 HS 0.0 569 MW 51651.08 214597835 16030.92 6400.00 6865 285.64 3630.30 3810.80 4320.01 1184.87 4188.85 HS 0.00 5.70 69.50 51651.0 2145901.20 164657.08 650.00 68.85 28564 3666.37 3846.87 4420.87 118981 4278.66 HS 0.00 5.71 6950 51652.17 2145928.78 164567.98 660.00 68.85 285.64 3702.45 366295 451372 1214.95 4360.48 HS 0.00 5.72 69.W 51652.76 2145956.35 164178M 6700.90 60.05 28564 3738.53 391903 4606.58 1240.09 4450.29 HS 0.00 5.74 W.W 5165336 214596392 16438978 MOM 68.65 20564 3774.60 3955.10 469944 1265.23 4548.10 HS 010 575 69.51 5165395 21401160 164300.60 69W.W 68.85 28564 3810.68 399118 092.30 1290.37 4637.92 HS OW 576 6951 51654.55 2146039.07 16421158 7000.90 60.85 285.64 3046.76 4027.26 4085.15 1315.51 477.73 HS O.W 5.77 6951 51655.14 214606664 164122.48 7100.90 68.85 28564 3082.83 4063.33 4976.01 1340.65 4817.54 HS OW 578 69.51 51655.73 214609422 164033.39 7200.00 68.85 285.64 3918.91 4099.41 W7087 1365.79 4907.36 HS O.W 579 69.51 51656.33 2146121.79 16394429 7300.00 60.85 285.64 3954.99 4135.49 5163.73 1390.93 4997.17 Hs 000 5.90 69.51 51690.92 214614936 163855.19 74W.W 6885 285.64 399106 417156 5256.50 1416.07 5086.99 HS 000 5.81 69.51 51657.52 2146176.94 16370.0 7WoW 68.85 265.64 4027.14 4207.64 534944 1441.21 5176.W HS 000 582 69.51 51658.11 2146204.51 16367699 76W.W 68.85 285.64 490322 424312 5902.39 146635 626661 HS O.W 583 69.51 51658.70 2146232.00 163W7.89 MW.W 60.85 285.64 4909.29 4279.79 5535.16 1491.49 -535643 HS OW 5.84 69.51 51690.30 214635966 16349879 78W.W 68.85 285.64 4135.37 4315.87 9028.01 151662 -644624 HS ow 5.85 69.51 51659.89 214625723 16340969 79W.W 68.85 285.64 4171,45 4351.95 2720.87 154176 -Moe 05 HS O.W 586 69.51 51690.48 2146314.80 163320.60 8000.00 68.85 285.64 4207,52 4386.02 5813.73 1566.90 5625.87 HS ow 5.87 69.51 51661.07 2146342.36 163231.90 81MOD 085 28564 424360 4424.10 580.9 1%2.04 5715.68 HS O.W 587 89.51 51661.67 2146369.95 163142AO 8200.00 6085 285.64 427988 4460.18 5999.44 1617.18 -505.49 HS O.W 5.88 0.51 51662.26 2146397.52 163053.30 830000 68.85 285.64 4315.75 4496.25 609230 1642.32 .9095.31 HS O.W 5.89 0.51 51662.85 2146425.0 16296420 840000 6885 285.64 4351.83 4532.33 6185.16 1667.46 -5985.12 HS 0.00 590 0.51 51663.44 2146452.67 162875.10 85000 68.85 28664 438791 4568.41 6278.01 16U W 5074.93 HS 000 5.91 69.51 516M N 214640.24 162786.90 8600.00 68.85 28564 4423.98 4904.48 637087 1717.74 5164.75 HS 0.00 5.92 0.51 51664.0 2146W7.81 162896.90 8700.00 0.85 285.64 4460.M 4640.9 646373 1742.88 $254.90 HS 0.00 592 0.51 51665.22 2146535.39 162607.81 0000.00 MS5 205.64 4496.14 4676.84 6556.% 170.02 5344.38 HS 000 5.93 69.51 51666.81 214652.96 162518.71 800,00 68.85 205.64 4532.21 01271 664944 1793.16 -6434.19 HS 0.00 5.94 69.51 51666AD 2146%oW 10429.61 U T7poe2H 099. f9 W85 28564 450W 4746W 6741.9 1818.10 552328 HS O0 595 W51 5166889 214661766 16234123 90W.W 68.85 205.64 456029 4748.79 6742.30 1818.30 552490 HS 0.00 SAS 6951 51666.99 2146618.11 162340.51 91W.W 6885 28564 4801.37 084.87 035.16 1843.44 4613.0 HS O.W 5.95 6951 5107.9 214684568 10251.41 92W.W 66.85 28564 4640.44 4820.94 692802 180.9 5703.0 HS 0.00 5.96 6951 51660.17 2146673.25 10162.31 930.90 68.85 285.64 487652 485702 7020.87 1893'2 5703.44 HS 0.00 5.97 6951 5160.77 21467W.83 162073.21 9W.0 68.85 205.61 4712.60 4893.10 711373 1918.0 5803.26 HS 0.00 5.98 69.51 5160.36 2146728.40 161984.11 9500.90 68.05 28564 4748.67 4929.17 7206.59 1944.W 5973.07 Hs O.W 5.98 6951 51669.95 2146755.97 161895.01 U TponeBI 9599.86 085 28564 478470 496520 7299.31 1989.10 -7062.76 HS OW 599 69.51 51670.54 214878351 161806.04 %00.0 60.85 285.64 084.75 496525 7299.45 1969.14 -71162.0 HS 0.0 5.99 6951 51670.54 21467810 16180592 9700.00 68.85 285.64 482083 W01.33 7392.30 1994.28 -TIU70 HS 0.90 6.0 69.51 51671.13 2146011.12 161716.82 9WOM 0.0 285.64 48W.W W3740 7485.16 2019.42 -724251 HS O D 6.90 69.51 51671'2 2146030.69 161627.72 %W.W 0.85 285.64 489208 W73A8 7578.02 2044.90 -0332.32 HS 0.0 6.01 6951 51672.31 2146866.27 161538.62 1000o.W 0,85 285.64 492906 5109.9 7670.0 206910 -7422.14 HS O.W 6.02 6951 516M.90 214093.04 161449.% 10190.00 0.85 285.64 4965.13 5145.63 "0.73 2094.84 -7511.95 HS O.W 6.02 69.51 51673.48 2146921,41 1613MA2 102W.00 0.85 20.64 5001.21 5181.71 7856.59 2119.98 -760136 HS ow 60 69.51 51674.07 2146948.9 16127132 U Tva J 10207.45 0.85 28584 5003.90 5184.40 7863.51 2121.85 760846 HS O.0 603 0.51 51874.12 21405f.01 161264.68 10300.00 68.85 28564 W37.29 5217,79 7949.45 2145]2 -0691.9 HS 0.00 6.04 0.51 51674.9 214076.56 161182.22 1040000 68.0 285.64 M7336 525306 004231 2170.26 -7781.39 HS 000 6.04 0.51 5167525 210904.13 161093.13 10W0.00 0.0 285.64 5109.44 5289.94 8135.16 2195.40 -7871.21 HS ow 605 69.51 51675.84 21003170 161004.03 106W.00 60.85 285,64 5145.52 5328.02 8228o2 222054 -796102 HS 0.00 6.90 69.51 51676.43 2147059.20 160914.0 10700.00 0.0 285.64 5181.0 592.09 8320.0 224568 -WW83 HS OW 6.06 69.51 5167.0 2147006.05 160825.0 1900000 0.0 285.64 5217.67 5390.17 841373 2270.81 .414085 HS ODD 6.07 69.51 516.4,61 2147114.42 160736.73 10900.00 68.85 28564 525375 5434.25 656% 2295.95 .4230.46 HS 0,00 6.07 69.51 51678.19 2147142.00 16W47A3 11000.00 6865 28564 5269.62 M7032 WNA5 232109 3320.7 HS 0,00 6.0 0.51 5167878 214710.57 160558.53 11100.00 6885 285.64 M25.90 5506.40 8692.31 234623 -8410.09 HS 0.00 600 0.51 51679.37 2147197.14 160469.43 11200.00 6885 285.64 061.90 5542.48 0785.16 2371.37 3499.90 HS ON 6.09 0.51 51679.96 210224.72 160360.34 11300.00 60.85 28564 5398.05 W78.M 8878.02 2396.51 39971 HS 000 BW 69.51 51690.54 214552.29 160291,24 1149000 68.85 28564 5434.13 5614.0 8970.88 242165 -0679.53 HS 0.00 6.10 0.51 5101.13 214M7986 160202.14 1150.00 68.85 28564 50021 MM.71 906374 2446'9 570.34 HS 0.00 6.11 6951 51681.72 2147W7,44 1W113.04 1160.W 66.85 285.64 5508.28 M8678 9156.59 201.93 4859.15 HS 0.00 6.11 69.51 51682.30 2147335.01 1WO23.94 1170.W 68.85 28564 55429 5722.86 924945 2497.07 5948.97 HS 000 6.12 69.51 51682.89 2147M.9 159934.84 Cosmopolitan Unit\Cosmoplitan Pad\H15-P2\H75-P2\H75-P2 (P7) Drilling Office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:23 PM Page 2 of 4 Cosmopolitan Unit\Cosmoplifan Pad\H75-P2\H15-P2\H15-P2 (P1) Drilling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:23 PM Page 3 of 4 MD Ind M. True TVDSS TVD VSEL NS EW TF OLS Dimclional Ezcluai"n Zona Eacluelon Zone C»oMap TI Hmbmp E44tlnp Commanb (a) V) PI (6) (R) IN (a) (R) (9 1'If9on1 Dlf"ulry b6ox aeH A"?% (nT) (Rus) (Mls) 11000.110 6685 285.64 5578.44 575sM 9342.31 252221 4M8]8 HS 000 6.12 6951 5160340 2147390.16 15994574 119110.00 68.85 28sM 5614.51 5795.01 9435.17 2547.35 -9128.59 HS 0.00 6.13 69.51 51684.06 214741773 159756,64 1200000 60.85 285.64 5fi50.59 5031.09 9528.02 2572.49 -9218.41 HS 000 6.13 6951 51604.65 2147445.30 159%7.55 121W00 60.85 285.64 S 6.67 5867.17 MOAB 2597.0 -9308.22 HS 000 6.14 6952 51605.23 2147472.87 159578.45 12200.00 88.85 285.84 5722.74 5903.24 9713.74 282217 -9396.04 HS 0.00 6.14 6952 516B5.0 2147SMAS 159489.35 12300.00 60,05 28564 5750.82 5939.32 9006.60 264791 -948785 HS 0.00 6.15 69, S2 51606.40 214752802 159400.25 12400.00 68.85 285.64 5794.90 597540 9899.45 2673.05 -9577.66 H6 0.00 6.15 6852 5168699 2147555.59 159311.15 12500.00 68.85 285.64 5830.97 6011.47 9992.31 2696.19 -%67.48 H6 0.00 6.16 69.52 51607.57 2147583.17 159222.05 12600.00 68.05 285.84 5867.05 6047.% 10085.9 272333 .9757.29 HS 000 6.16 6952 51688.16 214761074 159132.95 1270000 68.85 28564 5903.13 6083.63 10178.03 2748.47 .9847.10 HS 0.00 6.17 6952 51608.74 214763831 159043.85 12800.00 68.85 285.64 593930 611930 1027080 2773.61 -9936.92 H6 0.00 6.17 69.52 5168932 2147665.89 158954]5 Lawe7 TnnO 12e95.62 69.65 285.64 59)3.)0 6154.20 10359.67 279765 -10022.80 HS 000 618 69.52 51689.88 214769225 10800 12900.0. 68.85 28584 597538 6155.78 10383.74 27%.75 -9702673 HS 0.00 6.18 6952 $168991 2147693.46 15886566 1300000 60.85 28564 6011.36 6191.86 1"56.60 2823.89 -1011654 HS 0.00 6.18 69.52 516%.49 214772103 158778.58 13100.00 60.85 285.64 6047.43 6227.93 1054948 2849.03 -102%.38 HS 000 6.19 6914 5101.07 214774861 158687.46 13200.00 6885 285.64 6083.51 6264.01 10642.31 2874.0 -102%.17 HS 0.00 6.19 6952 51691.66 2147776.18 1565%.% 13300.00 68.85 285.64 6119.59 MOM 10735.17 2899.31 -10365.98 HS 0.00 620 69.0 5102.24 2147803.75 156509.26 LTro k MUM 68.85 28564 6142.20 632210 10793.37 2915.08 -10442.28 HS 0.00 a20 69.52 5169280 2147821.04 158453.41 13400.00 68.85 285.64 6155.0 6M6.16 10020.03 2924.45 -10475.80 IS 0.00 6.20 6952 51692.02 214703133 158420.16 13500.00 60.85 285.64 6191.74 6372.24 10920.09 2949.59 -10565.61 HS 0.00 en 6952 51693.40 214785890 15833106 _ 1360000 60.85 285.64 6227.82 640832 11013]4 2974.73 4065543 HS 0.00 6.21 09.52 5169399 2147886.47 158241.16 LTo k 1362048 6685 285.64 823520 641570 11032.75 29M 67 -1%73.80 HS 0.00 62f 6952 51894.11 2147892.11 158223.73 13700.00 68.85 285.64 6263.89 6444.39 11106.60 2999.86 -10745.24 HS 0.00 6.21 69.52 51694.57 214791405 158152.87 13800.0. 68.85 285.64 6299.97 "BOAT 11199.46 302580 -10835.05 HS 0.00 612 6952 51695.15 2147941.62 15806377 139M.00 60.05 285.64 6336.05 65I&M 11292.31 3650.14 -10924.87 HS 000 612 69.52 5169573 2147969.19 15797467 1400000 68.05 28564 6372.12 6552.62 11305.17 3075.28 -11014.68 HS 000 623 8952 51696.31 2147996.76 157885.9 L riw D 1401047 6885 28584 6315% 655640 11394.89 3071.92 -11024.08 HS 080 623 69.52 510637 214799985 15787624 14100.00 68.85 285.64 6406.20 6S%&70 11478.03 3100.42 -11104.49 HS 000 623 69.52 5169189 2140024.34 157796.47 14200.00 60.85 285.64 6444.28 6624.78 11570.69 3125.56 -11194.31 HS ON 623 69.52 51697,47 214005191 157707.37 14300.00 60,05 28564 6460.35 6660.05 11663.74 3150.70 -112".9 HS 0.00 6.24 6952 51698.05 2148079.48 157618.27 14400.00 68.05 285.64 6516.43 66%.93 11756.60 3175.84 -1137393 HS 000 6.24 6952 51690.63 2148107,06 157529.17 14500.00 60.05 28564 6552.51 6733.01 11049.46 3200.98 -1140.75 HS 0.00 825 69U 5169921 214813463 1944006 Lr kE 14590.34 68.85 2ea64 656510 6165.60 11933.35 3223.69 -11544.69 HS 000 a25 69.52 51899.74 2148159.54 151359.50 14600.00 60.85 285.64 654.50 670.08 11942.32 3226.12 -11553.56 HS 0.00 6.25 6952 51699.79 214816220 157350.96 1470000 68.65 28564 6624,66 6805.16 1203517 3251.26 -11643.37 HS 0.00 625 6952 51700.37 2148189.78 1928180 14800.00 68.85 285.64 6660.74 fi84124 12120.03 3276.40 -11733.19 HS 000 626 69.52 51700.95 214021735 157172.78 14900.00 60.05 285.64 66%.81 6877.31 12220.09 3301.54 .11823.00 HS 0.00 626 899 51701.53 2148244.92 157063.68 15000.00 6805 205.64 932.89 6913.39 1231375 3326.60 -1191281 HS 0.00 6.27 69.52 51702.11 214827250 158994.58 Sfm k"1 CDN 15089.00 6685 2WM 670..00 694550 1239639 3349.06 -1199215 HS 0.00 627 69.14 5110262 214829704 158915.28 Mb 15100.00 Sees 205.64 6768.97 fi949.47 12406.60 3351.82 -12002.63 HS 0.00 6.27 89.9 51702.69 2148300.07 156905.48 Sf" hkof 15164.95 6685 2MM 679240 892.90 1246692 336615 -12060.97 HS ON 621 89.52 51703.06 214017,98 156841.81 Cry 31100 15165.56 60.05 205.64 6792.62 6973.12 12467.48 3360.30 -12061.51 35.378 000 617 69.52 51703.06 2148318.15 15684707 15200.00 69.70 28628 6804.81 6885.31 12499.57 397.16 -12092.48 XUR 3.00 628 70.14 5190744 214832784 156816.35 Sfn hkofF 1520609 6989 28642 860797 6988.10 1250713 337929 -12099.76 35.MR 340 628 70.26 5195478 2146330.11 156808.13 15300.00 7216 288.09 683748 701798 12593.86 3405.% -12102.76 34.558 300 680 71.95 52474.84 214835821 15926.86 Sl�kofE 15301.69 7220 288.12 683880 1018.50 1259546 3406M -1218.29 34.MR 3.00 630 71.0 5248326 21400 75 1592&35 Sfm k&O 15383.40 1423 28956 8861.00 1041.10 1293.83 343085 -12258.32 34.12R 3.00 632 73.46 52913.41 214MM02 15885203 15400.00 74.64 289.85 6866.5 784655 12689.62 3438.24 -12273.37 M.84R 300 633 73]9 9996.99 2148391.82 156537.13 9 -NB' 1548180 7666 281.25 688614 706884 12188.08 346319 -1234684 33.7R 3.00 630 1530 5338a55 214842136 1585&.44 15500.00 7713 291.57 689044 7070.94 12786.58 300.55 -12364.07 33.UR 300 6.35 75.0 53411.90 214"28.58 15654740 Sfa ILhk&A 1555625 78.54 292.53 8902.30 1082.80 12841.56 3491.19 -1241&03 33.42R 3.00 636 76.72 53460 2148450.81 156497.01 - SfM k"IC 15567.46 lam 292.72 89".50 108500 12852.55 349542 -12425.18 33.39R 3.00 636 76.93 5379.17 214845511 15648699 15600.00 79.63 29326 6910.50 MIN 128MA9 359.90 -12454.60 33.288 3.00 6.37 77.55 53894.90 214640.39 1S649.91 Ml fik&B 1569419 82.01 294.84 025.70 71M20 12977.92 3546." -12MO.M 33.03R 300 639 19.31 M2d4% 214850963 156373.84 15700.00 82.14 294.92 692642 7106.92 12903.00 3548.21 -12"4.73 M.UR 3.00 eM 79.47 54262.61 2148511.13 156368.91 15800.00 M.66 296.57 037.91 711841 13002.06 359136 -12634.19 32.838 3.00 641 81.40 M572.17 2148556.70 156280.65 15900.00 919 298.19 6"5.01 795.51 13181.10 369.23 -12722.75 M.MR 300 643 83.34 MU1.16 2140684.% 156193.37 1600000 09.71 299.01 6"7.17 712822 13200.16 3605.69 -12810.17 U.M 3.00 645 85.30 550912 214865518 15619.30 End Cry 16011.46 90.00 300.00 6M7.75 7128.25 1329148 3691.41 -12820.11 HS 3.00 645 6552 5502504 2148661.77 156097.9 Cry&IW 16021.46 90.00 300.00 6M7.75 712835 1330136 3896.41 -1282617 7.UR 0.00 645 85.52 55025.05 2148%700 156089.00 16100.00 9234 30031 6946.15 7126.65 1398.9 3735.85 -120%.66 TUR 3.00 647 87.0 5510.94 214908.27 156022.21 KOP Cry VIM 16120.00 92.93 300.39 6M523 7125]3 133%.59 3745" -12913.% LS 3.00 6A7 W22 016682 214918." 156005.25 16200.00 91.33 MOM 6M226 7122.76 1307.46 3706.39 -12914.85 LS 2.00 648 86.69 55101.24 2148761.14 155937,42 Crv2110o 16270.00 89.93 300.39 6M1.49 7121.99 13546.51 3141.00 -1384323 1014311 2.00 6.49 85.35 5501147 2149%.18 15590.02 16300.00 09.81 300.98 6"156 7122.06 IM7609 3037.11 -13069.03 101.43R 200 650 05.07 54988.91 2148614.19 155052.65 16400.00 09A1 302." 694223 712213 1367435 30%." -1310..86 10142R 2.00 6.51 ".13 54804.49 2140069.41 15576920 EM Cry 164%" 89.19 384." 6942.91 7123.41 1072&96 3920.96 -13200.59 HS 2.00 6.14 8362 54851.10 2148901.58 15572341 16500.00 0919 3".04 6943.53 712603 1377178 3"5.56 -13237.0 HS 000 614 83.62 54851.14 2140927.9 15568T67 166M00 89.19 384." 69".94 7125.44 1386920 4001.53 -13319.00 HS 0.00 6.0 83.62 5485124 2148%530 155608.36 1900.00 89.19 304.04 694635 7126.85 IM66.61 4057.50 -13402.73 HS 000 653 83.62 MMI& 2149043.58 15514&05 Cry 6100 16777.60 09.19 30404 6"7.44 7127" 14042.28 410698 -1346710 5219L 000 654 8362 54851.40 2149%8.80 155461.89 16800.00 89.60 30351 6947.60 7126.18 1404.04 411339 -13485.65 52.18L 300 654 ".16 54%700 2149101.70 158443.69 Cm WIN 16141.54 90.00 303.00 6947,75 712825 1408509 4125.20 -1350166 161- 300 6.55 84.66 M956.0 214911400 155426.00 KOP Cry N100 16900,00 92.35 302.93 6946,14 7126.64 1416183 4167.06 -13%9A7 LS 300 6.56 86.96 5511593 2149150.46 155361.38 Cosmopolitan Unit\Cosmoplifan Pad\H75-P2\H15-P2\H15-P2 (P1) Drilling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:23 PM Page 3 of 4 Commends MD Mcl Haim True NO33 NO VSEL NS EW TF OLS Duro ExcluMan Zona Euluaion Zone GecMp TM1 NoMip E»dng 13.375 IRI (% (% (R) (ft) (ft) (R) (ft) (% Index ('/tooft) DlMcufty lnMx Alert Angle (nTl (ftus) (f4U3) 16120.000 17000.00 9035 302.93 6943,78 7124.20 14259.63 4222.23 -13653.31 LS 200 657 05.04 54986.91 2149215.07 15527898 Cry 21100 170%% 8935 302.93 6943.91 7124.41 14308.55 424942 -13695.33 67.671. 200 6.50 04.00 5489928 2149243.38 155237.77 End Cry 17085.00 89.62 302.29 694471 7124.72 14342.63 426020 -13724.01 HS 2.00 6.59 64.52 51941.13 2149263.04 15520882 17100.00 89.62 302.29 6944.32 7124.82 14357.54 4276.29 -13737.50 HS 000 6.59 04.52 54941.14 2149Y1.39 155198.36 1720000 8962 302.29 6944.99 7125.49 14455.61 4329]1 -13022.03 HS 000 6.59 84.52 549,022 2149327.09 165113.30 173M N 89.62 302.29 6945.65 7126.15 14553.67 4383.12 -13906.57 HS ON fi 60 84.52 54941.29 214938278 155030.25 17400.00 89.62 30229 6946.32 712682 14651.73 4436.53 -1399111 HS ON 6.60 8452 54941.37 2149438.48 154947.19 17500.00 B9.62 302.29 OWN 7127.48 14749.80 4489.95 -14075.64 HS 0.00 861 Si 5494144 2149494.17 154864.14 1760000 Me 302.29 6947.65 7128.15 14047.06 454336 -14180.18 HS 0.00 6.61 8452 54941.51 2149549.87 15478108 Cry 3/100 17808.87 89.62 30229 6947.71 7120.21 14856.56 4548.10 -14167.68 10.02R 0.00 6.61 84.52 54941.52 2149554.81 154,43.71 Cry 31100 17621n 90.00 302.35 694775 7120.25 14869.21 4555.00 -14178.58 0.2111 300 6.62 84.87 5497244 2149562.00 15478300 7000.0 92.35 302.36 6946.15 7126.65 14945.89 4596.86 -14244,64 0.218 3.00 6.63 87.12 5512399 214960684 151698.10 KOP Civ 21100 1771000 9265 302.35 6945.71 7126.21 1495588 460220 -14253.08 LS 3.00 6.63 0740 55137.23 214961121 154899.81 1780000 90.85 30286 8942.97 7123.47 15043.87 4850.35 -1432906 LS 2.00 6.64 85.88 55038.81 214966141 15461516 CNY/100 17860.00 89.65 30236 6942.71 7123.21 1510269 468247 -1437914 167.31R 200 6.65 84.53 54942.10 2149694.90 15456538 End Cry 17868.70 8948 30240 894278 7123.20 15111.22 4687.13 -1438709 HS 200 6.65 64.35 54925.90 2149699.75 154558.16 17900.00 8948 30240 694306 7123.56 15141.90 470390 -1441352 HS 0.00 6.65 84.35 %925.92 2149717.24 15453220 1800000 8948 30240 6943.98 7124,40 1523993 4757.48 -14497.94 HE 000 6.66 04.35 54926.00 2149773.10 151449.26 -- 18100.00 8948 302,40 6944.89 7125.39 1633795 481107 -14582.37 HS 000 666 64.35 54926.07 2149826.96 15436632 18200.00 NAB 302.40 694580 7126.30 15435.97 4864.65 -14666.80 HS 0.00 667 04.35 54926.14 2149004.82 154283.37 18300.00 8948 30240 6946.71 712721 155.19.99 491623 -1475123 IS 000 6.67 84.35 54926.21 2149940.66 154200.43 18400.00 8948 30240 6947.63 7128.13 15832.02 4971.82 44835.65 HS ON 6.68 84.35 54926.28 2149996.54 154117.49 Cry&100 18404.02 . 0948 30240 6947.67 7128.17 15638.74 497640 -14839]2 4.19R 0.00 668 84.35 51926.29 2149999.23 154113,49 Cry&100 1842230 90.00 302,44 694715 712825 15653.87 4903.77 -14854.48 OAR 300 668 64.85 54970.82 2150009.00 15409900 10500.00 9233 302.44 6946.17 7126.67 15730.01 5025.44 -14920.03 CAR 3.00 669 8700 55122.47 2150052.44 154034.60 18600.00 95.33 30245 693949 711999 1582719 5078.97 -15004.23 0.1R 3.00 6.71 89.96 55193.95 2150100.24 15395189 18700.00 96.33 302.46 6927.60 7108.10 15925.09 5132.24 -15000.00 0.11R 300 6.72 87.16 5512602 215018317 1SM69.59 18800.00 101.33 30246 6910.52 7091.02 16021.85 5185.11 -15171.13 0.118 3.00 674 8128 54918.92 2150218.89 15378793 10900.00 104.33 302.47 6000.32 7068.82 16117.20 523741 -15253.39 0.11R 3.00 616 8140 54573.38 2150273.43 153707.13 190MM 107.33 302.47 6661.04 7041.54 16211.47 5209.09 -15334.55 0.118 300 6.77 78.53 54090.51 2150327.27 15362740 19100.00 110.33 30240 602877 7009.27 16304.22 5339.90 -15414.38 011R 3.00 6.78 7566 53472.04 215038023 153548.97 19200.00 113.33 302.49 6791.58 697208 16395.18 538915 -1549260 0.1111 3.00 Sal) M.79 5272011 21M432.19 153472.06 End Cry 1925583 115.01 30249 6768.73 6949.23 16445.09 5417.10 -15535.64 HS 3.00 6.01 71.19 5224315 2150480.71 15342986 19300.00 11501 30249 6750.06 693058 16484.32 5438.61 -1556941 HS 000 6.01 71.19 52242.97 2150483.12 153398.86 19400.00 115.01 30249 6707.79 688819 16573.13 5487.28 -15645.85 HS 0.00 6.61 71.19 52242.36 2150533.86 153321.59 1950000 115.01 302,49 6665.51 684601 1606194 5535.98 -15722.30 HS ON 682 71.19 52241.74 2150584.80 15324607 19600.0 11501 302.49 6623.24 6803.74 16750]5 558464 -1998.74 HS ON 682 71.19 52241.13 2150635.34 15317140 1070000 11501 30249 658097 6761.47 16839.56 5633.32 -15875.18 HS 0.00 883 71.19 52240.52 2150606.08 153096.31 1980000 115.01 30249 8538.70 6719.20 1692837 588200 -1595163 HE ON 6.83 71.10 52239.90 2150736.82 153021.22 19900.00 115.01 302.49 6496.43 6676.93 17017.18 5730.68 -16028.07 HE 000 6.84 71.10 52239.29 2150787.56 152948.13 20000.00 115.01 30249 6454.78 6634.66 17105.99 5779.38 -1610451 HE 0100 6.84 71.18 52236.9 2150030.30 15287103 TO 20050.65 115.01 302.49 64n75 6613.25 • 17150.97 5804.01 -78743.23 0.00 684 71.18 52238.36 2150864.00 152833.00 Survey Error Model: ISCWSA R» 0 -'- 31) 95,000% Confidence 27955 sigma Survey Program: Daecdpllon Part MD From (ft) MO To (ft) EOU Fres, (ft) H.6307 Ilnl Caeip Diamemr ExP::,ad M» Ilnl Inclim., (d., Sumy Tool Type 0.000 1500.000 11100.000 17.500 13.375 SLB_81WDSTD OOOD 5623.040 11100.000 17.500 13.375 SLB_MWD+GMAG 5623040 7050.000 11100000 12.250 9.625 SLB_MWDSTD 5623040 15401.000 11100000 12.250 9,625 SLe_MWD+GI G 15401.000 16120.000 11100000 0.500 0000 SLB_MWOSTD 15401.000 16120.000 11100000 0.500 0000 SLB_MWD+GI.NG 16120000 16900.000 11100.000 0.500 ONO SLB_MWD4TD 16900.000 110`10.000 1(100.000 0.500 0.000 SLB_MWD+GMAG 17710.000 20050.647 11100.000 8.500 0000 SLB MWD+GMAG BoraM1ols / Survey 1101-1.01 / H04101 H04-L01/HW4 01 H04101/H04101 H04{01/1104{01 HN01/1104101 HN -L02 / H04{02 1104-L04 / 1104104 Cosmopolitan Unit\Cosmoplitan Pad\H75-P2\H75-P2\H15-P2 (P1) Drilling office 2.8.572.0 . Schlumberger -Private 10/10/2018 2:23 PM Page 4 of 4 vemcN section Mane (0.00 ft N, 0.00 R E) 0 391.00° Venicel Sect. (ft) veTcA$C onMIne (0.00 R N. 0.00 R E) 0 391.00° Venicel Section (ft) WEST (ft) EAST i x s 0 N Xhlumb fg,PHn to WEST (t) EAST Offset Trajectory H04-L03(PI)(Def Plan) H04-L02(PI)(Def Pian) Allow I Sep. I Controlling 0.00 281.91 -168.3] -261.91 1.01 004 1404-1-04 (P1) Anti -Collision Summary Report Analysis Date-24hr Time: September 25, 2018- 11:25 Analysis Method: 3D Least Distance Client: SlueCrest Reference Trajectory: 14041.04 (Pi) (Def Plan) Field: Cosmopolitan Unit Depth Interval: Every 10.00 Measured Depth (8) Structure: Cosmopoitan Pad Rule Set: D&M AntiCollision Standard S002 v5.1/5.2 Slot: H-04 Min Pb: All local minima indicated. Well: H04 Version/Patch: 2.10.544.0 Borehole: 14041_04 Database t Project: localhosttdr long -Cook Inlet Scan MD Range: 17710.0011- 20050.8511 120.07 83451 Trajectory Error Model• ISCWSA03D 95.000% Confidence 2.7955 sigma, for subject well. For 112.49 296.15 259.08 4.99 Offset Trajectories Summary 114.51 Offset Selection Criteria 155040 22.04 Wellhead distance scan: Restricted within 61061.158 2224.28 1981.8= Selection filters: Definitive Surveys - Definitive Plans- Definkive surveys exclude definitive plans - All Non -Def Surveys when no Def -Survey is set in a borehole -All Non -Def Plans when no Def -Plan is set in a borehole Offset Trajectory H04-L03(PI)(Def Plan) H04-L02(PI)(Def Pian) Allow I Sep. I Controlling 0.00 281.91 -168.3] -261.91 1.01 004 143.14 -95.81 -143.10 -0.01 80.76 124.70 -281 -43.95 0.97 119.30 119.99 38.87 -0.69 1.49 338.23 115.0 261.11 223.1 4. 341.15 104.03 2]1.3] 237.12 4.98 800,15 113.69 7'23.93 686.47 1086 194.56 111.141 120.07 83451 2.64 371.58 112.49 296.15 259.08 4.99 1664.91 114.51 1588,14 155040 22.04 Hansen #1A (Def Surrey) 2541.18 743.48 2045.20 2536.95 740. 204266 1]98.01 5.1 2451.44 729 NJ1 172208 5.05 2415.02 725.95 1930.72 1889.07 4.99 240D.67 ]2].18 1915.5] 16]3.51 4.96 239293 719.64 1912.84 167329 409 2214 01 721.7 1 ]32.55 1492.31 4 61 1]29.50 718,55FUN14F 1010961 3.61 H041_01 (P1) (Def Plan) 55782 8827 498.341 469.34 9.59 2616.48 115.99 2538.72 2500.48 34.20 OSF1.50 1]]1000 OSF1.W 1]]20.00 0SF1.50 18190.00 OSF1.W 1831000 OSF1.50 19320.W OSF1.50 19370,00 OSF150 20050.65 OSF1.50 1]]10.00 OSFl 50 18130.00 OSF1.50 20050.85 OSF1.50 1]]10.00 0SF1,50 1]]30.00 OSF1.W 18000.00 OSF1.50 18100.00 OSF1.50 1814000 OSF1.50 181W.0 OSF1.50 18610.00 OSFi.W 20050.65 7126.21 OSF<5.00 712577 ]12621 ]12].30 6822.10 6900.97 OSP500 6613.25 712621 OSF<5.00 7125.66 OSF>5.00 6613.25 254742 ]126.21 ]125.36 ]124.48 ]125.39 ]125.]5 ]125.94 ]119.03 661325 OSF1.50 17710,00 7126.21 OSF1.50 20050.65 5513.25 OSF<5.00 OSF>5.00 OSF<5.00 OSF<1.50 OSF>1.50 OSF<1.00 OSF>1.00 Alert I Status Fail Major Enter Major Minirt-O-SF Exit Major Exit Minor Minis Fait Alan TO Waming Alen Enter Alen Exit Alen TD Warning Alert MinPts MIn% Minta Enter Alen Exit Alen Enter Alen Mints MlnPN Peas Minis TD Hansen #1 (Def Survey) Pass 254742 741.49 2052.82 180603 5.18 OSF1.50 18230.00 ]126.5] Mints 254].39 741.36 20U311 1806.03 5.16 OSF1.W 18240.00 7126.67 MINPT-0-EOU 254].38 ]41.2] 2052.84 1006.09 5.16 OSF1.00 18260.00 7126.85 Mirjn-ct 2710.28 728.46 2224.28 1981.8= OSF1.50 19610.00 6]99.52 MinPI-0-SF 286026 685.69 2402.79 2174.57 6.26 OSF1.50 20050.65 6613.25 TD Hansen #1AL1 (DaF Survey) Pam 2704.16 669 .50 225].48 2034.66 6.0 OSF1.W 17710.00 7126.21 MlnPts 2988.83 ]18.02 246980 2250.61 8.21 OSF1.50 19850.00 6782.61 IL_K225.61J 718.0 2489.5 2250.60 6.21 OSF1.50 19660.00 6]]8.38 MinPt-0-SF 2969.28 721.2 2488.0 2247.99 6.18 OSF1.50 19840.00 6702.29 Min%a 2989.58 721.69 2488.10L22447,88 6.18 0SF1S0 19870.00 6889.81 MINPT-O-EOU MinlotOADP Schlumberger -Private 2973.40 723.34 249082 2250.06 6.1 OSF1.50 20050.65 661325 H16POl (Def Survey) hStt9iMM, Paas Min%s Min% -O SF Min% -0 -SF Min% -O -SF Minft MInPI-OSF MmPls MmPt-cn Min%s Pass MlnP MmRP SF MmRP F MmPt-0-SF MInPtOSF MinPt.O-ADP MINPTOEOU MInPI-Cn MhPt-O-SF MinPls Min% -0 -SF Minft MInPt4 Ct MinPtOSF MINPT-O-EOU Minft TD Pass Min%s MinPls MInPI-O-ADP MInPI-O-SF TD Pass MlnPla AMPM Min%-6AOP M1nPIOSF TD Peat MlnPls Minft MinP1-0-ADP MinPt-OSF TD Pass MinPls Min%a MInPtOADP Min%OSF TO Paas MlnPls MinPls MmPt-O-ADP 3117.74 255.1]294].3 2862.57 18.39 OSF1.50 17710.00 7126.21 3120.13 255.59 2949.41 2884. 18. OSF1.50 1"80.00 7123.83 3134.99 256.76 2963.48 2878.2 18.3 OSF1.50 18170.00 7126.03 3144.95 258.99 2973.29 288] 18.4 OSF1.50 18390.00 7128.03 3153.12 258.4 2980.46 2894.6 1836 OSF1.50 18550.00 7123.98 3138.67 265.96 2981.03 26]2 ]1 11.7 OSF1.50 19370.00 6900.97 313789 265.75 29603 28]2.1 17.77 OSF1.50 19460.00 688292 31378 265.81 2980.41 2872.17 1778 OSF1.50 19480.00 6854.47 3163.15 324.781 2W.301 2830.37 14.651 OSF1.50 20050.65 6613.25 H16 (Def Survey) 3117.74 255.1] 2947.3D 2882.57 1839 OSF150 17710.00 7126.21 3120.13 255.59 2949.41 2864.54 18. OSF1.50 1"80.00 7123.83 3134.99 256.76 2963.48 2878.22 18.3 OSF1.50 18170.00 7128.03 3142.08 256.58 2970.70 2885.50 18.4 OSF1.50 18330.00 7127.49 3149.84 260.96 275.34 2888.68 18.1 OSF1.50 18500.00 7126.87 3149.04 260.77 2974. 2888.2 18.18 OSF1.50 18580.00 7121.74 3149.02 260.7 274.8 2888.27 18.16 OSF1.50 18590.00 7120.89 3149. 260.69 297489 2888.31 18.18 OSF1.50 18810.00 7119.03 3153.75 280.37 2979.84 2893.3] 18.2 OSF1.50 18880.00 7073.67 3158.21 282.05 2983.1 2896.1 18.14 OSF1.50 1902000 7035.48 3181.]8 265.13 2984.]0 2896.65 1]. OSF1.50 19380.00 6896.74 3161.71 285.1 2984.6 2896.00 17.95 OSF1.50 19420.00 679.83 3181.71 285.11 2984.65 2896.61 17.95 OSF1.50 19430.00 8875.60 3183.63 285.38 2986.39 2898.2 179 OSF1.50 19690.00 785.]0 3171.16 287.86 29922] 2903.31 17.82 OSF1.50 20030.00 8821.98 3171.32 268.08 n92.28IL2203IJ 17801 OSF1.50 20040.00 681.75 3171.50 268.09 2992.44 290341 17.80 OSF1.50 20050.65 6613.25 1116A-L08(P3)(Def Plan) 320064 299.52 3000.64 2901.13 1608 OSF1.50 17710.00 7126.21 32011.78 29869 3000.66 2901. 16.07J OSF1.50 1"8000 7123.83 3210.36 302.33 3008. 2908.03 15.98 OSF1.50 18820.00 7118.03 3219.84 305.04 3016.15 2914]9 1588 OSF1.50 1934000 6913.85 3253.81 305.84 3049.59 294].9] 16.01 OSF1.50 20050.65 6613.25 H16A-L05(P3)(Def Plan) - 3200.64 299.52 300064 2901.13 16.08 OSF1.50 1]]10.00 7126.21 3200.78 299.69 3000.66 2901.0 16,7O5F1.50 1]]8000 7123.83 3210.36 30233 3006 29080 15.98 OSF150 18620.00 7118.03 3219.84 30504 3016.15 N14.791 15,Nl OSF1.50 1934000 6913.65 3253.81 30584 3049.59 294].9] 16.01 OSF1.50 2005085 8813.25 H16A-L7(P3)(Def Plan) 3200.64 299.52 3000.fi4 2901.13 1808 OSF1.50 17710.00 7126.21 3200]8 299.69 WIMMI 29010911 16.0 OSF1.5D 17780.00 7123.83 3910.36 302.33 3008.4 29080 15.98 OSF1.50 1862000 7118.03 3219.84 30504 3016.15 2914.79 15,mi OSF1.50 19340.00 6913.65 3253.81 305.84 3049.59 2947.7 16.01 OSF1.50 20050.65 6613.25 H16A(P3)(Dal Plan) 3200.64 289.52 3000.64 2901.13 1608 OSF1.50 17710.00 7126.21 3200.78 299.69 3000.66 290109 16.7 OSFI,50 1]]80.00 7123.83 3210.36 302.33 3008 2908.03[ 15.98 OSF1.50 18620.00 7118.03 3219.84 305.04 3016.15 2914.]9 1588 OSF1.50 19340.00 8913.65 3253.61 305.84 3049.59 294].9] 16.01 OSF1.50 20050.85 8613.25 H16A-L04(P3)(Daf%en) 3200.64 299.52 300064 2901.13 16.08 OSF1.50 17710.00 7126.21 3200]8 299.89 30W.661 201.021 16,071O5F1.50 17780.00 7123.83 3210.38 302.33 3008.48 2908.0 15.98 OSF1.50 1862000 7118.03 SshlumDefger-PNvats hStt9iMM, Paas Min%s Min% -O SF Min% -0 -SF Min% -O -SF Minft MInPI-OSF MmPls MmPt-cn Min%s Pass MlnP MmRP SF MmRP F MmPt-0-SF MInPtOSF MinPt.O-ADP MINPTOEOU MInPI-Cn MhPt-O-SF MinPls Min% -0 -SF Minft MInPt4 Ct MinPtOSF MINPT-O-EOU Minft TD Pass Min%s MinPls MInPI-O-ADP MInPI-O-SF TD Pass MlnPla AMPM Min%-6AOP M1nPIOSF TD Peat MlnPls Minft MinP1-0-ADP MinPt-OSF TD Pass MinPls Min%a MInPtOADP Min%OSF TO Paas MlnPls MinPls MmPt-O-ADP 323716 309.53 3031.08 292823 1574 OSF1.50 20050.65 6613.25 H1SA-L03 (P3) (Def Plan) Pass OSF1.50 17710.00 7126.21 MinPls OSF1.50 20050.65 320064 299.523000.64 2901.13 16.08 OSF1.50 17710.00 7126.21 7126.21 3200.78 299.69 WW.ffil 2901.09N 160711 OSF1.50 17780.00 7123.83 MINPT-O-EOU 3219.99 308$2 3013.92 2611.37 15.70 OSF1.50 19830.00 670852 OSF1.50 3228.84 305.86 302480 2922.97 1588 OSF1.50 20050.65 6613.25 H16A.LD2 (P3) (DefPlan) 7126.75 Minn-CICY OSF1.50 1839D.00 7128.03 MInRt SF OSF1.50 18570.00 7122.54 3200.66 299.47 3000.691 2901.19 1608 OSF1.50 1]]1 DIM 7126.21 18600.00 3202.52 299.74 3002.38 29D2.7jL___16,0j 7089.03 OSF150 1794000 7123.93 7058.51 3208.30 300.32 3007.76 2907.98 16.07 OSF1.50 1824000 7126.67 MInPt-=t 3232.19 301.71 3030.73 2930.4 16.12 OSF1.50 19060.00 7022.77 OSF1.60 3387.69 279.97 3200.72 3107.72 18.21 OSF1.50 20050.65 661325 1116A101 (P3) (Def Plan) 321003 29687 3010,451 2911 161 16.16 381885 238.89 365926 379.96 2407 H12103 (Def Survey) H12 -L02 (Def Survey) H12 -L04 (Def Survey) 4053.63 273.93 3870.88 3779.70 22.2 4050.26 273.14 386].84 3T7].12 22.32 4050.24 27312=3867.81 3777.12 22.32 4050.23 273.10 388284 3]]213 22.32 4050.55 273.98 388].5] 3776.58 22.2 4049.80 273.67 3867.0 3]]8.1 22.27 4049.77 273. 386].0 3]]8.14 22.28 eD49.7 273.59 3867.04 3776.17 22.28 405D.01 275.61 3865.90 3]]4.40 22.12 4048.75 274.95 3863.13 3]]1.80 22.15 4046.]2 274.9 3883.12 3]71.81 22.15 00488 2]4.81 3863.15 3771 88 22.16 4042.15 2]8.46 3857.52 376589 22.0 4040.55 276.113856.15 3764.4 22.02 404052 276.0 3856.1 3]64.44 22.03 F= 27&05 3856,15 3764.46 2203 4031.90 278.54 3845.88 3]53.38 21.7 4028.46 278.08 38427513]50.39 21 80 4028.45 278.05 3642.76 375040 21.80 4033.10 279.2 F 384(5,611 3753.86 21.74 4033.43 279.81 3848.5 3]53.62 21.69 4035.80 28011 3848.84 3755.80 21.88 405363 273.93 3870.68 37]9.]0 22.2] 40.50.26 273.14 3667,84 37]].1F 22.32 4050.24 2]3.12 366]8 37]].12 22.32 4050.23 273.10 386284 3777.13 2232 4050.55 274.00 38137.58 3]]6.55 22.25 4049.41 273.7 3886.5 3]75. 2226 4049.4 273.69 3888.81 3775.71 22.27 4050.9 274.3 3887.] 3776.418.91 4055.07 274.1] 38]1.96 3780.904037.]5 321.39 3823.17 3]18.374037.59 321.28 3823.09 3716.33 4037.54 321.19 3823.09 3716.35 18.91 403].52 321.12 3823.11 3716.40 18.81 4041.39 319.80 3627.99 3721.79 1902 4053.63 273.93 387068 377970 22.2 405D.26 273.14 386T841 37]].1 22.32 4050.24 273.1 3867.8 3]77.12 22.32 MinPI-O-SF Pass MinPls MinPts MinPI-O-SF TD Pess MinPls MinP4O-SF Min%-OSF MmPt-O-SF TD Pass OSF1.50 17710.00 7126.21 MinPls OSF1.50 20050.65 661325 TD Pass OSF1.50 17710.00 7126.21 MinPI-O-SF OSF1.50 17920.00 7123.75 MinPt-O-ADP OSF1.50 17930.00 7123.64 MINPT-O-EOU OSF1.50 17940.00 7123.93 MInPl- Ct OSF1.50 18040.00 7124.84 MlnPt-0-SF OSF1.50 18120.00 7125.57 Minn -O -ADP OSF1.50 18130.00 7125.66 MINPT-0EOU OSF1.50 18140.00 7126.75 Minn-CICY OSF1.50 1839D.00 7128.03 MInRt SF OSF1.50 18570.00 7122.54 MinPt Is OSF1.50 18580.00 7121.74 MINPT-O-EOU OSF1.50 18600.00 7119.99 MInPt-CtCI OSF1.50 18810.00 7089.03 MinPl-OSF OSF1.50 18940.00 7058.51 MinP1-0-ADP OSF1.50 1895000 7055.81 MINPT-O.EOU OSF1.50 1898000 7053.06 MInPt-=t OSF1.50 19200.00 13972.08 MMPI O -SF OSF1.50 19410.00 8884.06 Mh% OSF1.60 19420.00 8879.83 MIOPI-CtC OSF1.50 19750.00 6740.34 MINPT-0EOU OSF1.50 19830.00 0706.52 Minins OSF1.50 20050.65 661325 MinPt-O-SF Pass OSF1.50 1771000 7126.21 WPt-OSF OSF1.50 17920.00 7123.75 MinPI-O-ADP OSF1.50 17930.00 7123.84 MINPT-O OU OSF1.50 17940.00 7123.93 MinP1-CICt OSF1.50 1804000 7124.84 MhPI-O-SF OSF1.50 18170.00 7126.03 Minft OSF1.50 18190.00 7128.21 MmPt43tCt OSF1.50 18380.00 7127.94 Wft OSF1.50 18680.00 7113.48 MInPI-OSF OSF1.50 19830.OD 6706.52 MlnPt-OSF OSF1.50 1985000 6698.07 MmPt-O-ADP OSF1.50 19860.00 5693.84 MINPT-O-EOU OSF1.50 19870.00 6689.61 MinmI ct O F150 20050.65 5513.25 TD Pass OSFL50 17710.00 7126.21 MinPt-O-SF OSF1.50 1792000 7123.75 Minm-O-ADP OSF1.50 17930.00 7123.84 MINPT-O-EOU Schlumberger -Private F4050.2 273.10 3867.84 377).13 2232 OSF1.W 17940.00 7123.93 MinPt-Cl0t 4050.55 273.98 3887.57 3]]6.58 22.25 OSF1.W lW40.W 7124.86 MInRt F 4049.80 273.67 3W7 02R 3])6.13 22.2] OSF1.50 18120.00 ]125.5] Minpt-6ADP 4049.77 273.63r 3N7.041 3]]6.14 22.28 OSF1.50 18130.00 7125.68 MINPT-O{OU 4049.7 2]3.59 3867.04 3776.17 22.28 0SF1.50 18140.00 7125.75 MinPt-=t 405001 275.61 3865.94 3774.40 22.1 0SF1.50 18390.00 7128.03 MmPt-O-SF 4046.75 274.95 3863.13 3]]1.8F 22.15 0SF1.50 18570.00 7122.54 MlnPI-O-ADP 404672 274. 3863.12 3=]1.81 22.15 0SF1.50 18580.00 ]121.]4 MINPT-O-EOU 4046.6 274.81 386315 3771.88 22.16 0SF1.W 18800.00 7119.99 Mint-CtCt 4040.47 278.40 385587 3764.07 22.00 0SF1.W 18910.00 7088.32 MinPI-O-SF 4039.73 276.30 3855.20 3]fi3.43 2200. OSFIM 19020.00 7035.46 Mint -O -ADP 4039.]3 276.2 3855.2 3]63.43 2200. OSF1.W 19030.00 7032.38 MinPts 4039.72 2]].05 3854.69 3762,67F---21-9411 OSF1.50 19180.00 6979.91 MinPt-O-SF 4039.W 2".05r 3854661 3762641 21.94 OSF1.50 1920000 8972.08 MlnPls 4039.89 2n 04 3854.86 3762.64 2194 OSF1.50 19210,0 8988.10 MmPt-CICI 4040.50 2]].33 3855.29 3]63.1] 21.93 OSF1.50 1938000 8905.19 MhPt-O-SF 4070.84 276.65 3688.08 3794.19 22.15 OSF1.50 20050.85 6813.25 TD H12 (Def Surrey) pass 4053.63 273.93 3870.68 3779.70 222 OSF1.50 1771000 7126.21 MinRt SF 4050.26 273.13 3867.843)7].1 F2232 0SF1.50 17920.00 7123.75 MmPt4 ADP 4050.24 273.11 386].84F 3777.12 2232 0SF1.50 17930.00 7123.84 MINPT-O-EOU 4050.2 273.10 3867.84 3777.14 22.32 0SF1.50 17940.00 7123.93 mmPt-CtCI 4050.55 273.97 3867.58 3776.58 22.2 0SF1.W 18040.00 7124.84 MInPt-OSF 4049.80 273.67 3867.0"' 37]6.1 2227 0SF1.W 18120.00 7125.57 MinPt-OADP 4049.77 273.83 388].0 3)]6.14 2228 0SF1.W 18130.00 7125.66 MINPT4 EOU 4049]6 273.59 386]04 3]]6.17 22.28 OSF1.W 18140.00 7125.75 Mi m-CICI 4050.01 275.81 3865.94 3]]440 22.12 OSF1.50 18390.W 7128.03 MinPI-O-SF 4046.75 274.94 3883.13 3]]1.81 22.15 OSF1.W 18570.00 7122.54 MinPt-O-ADP 4046.72 274. 3M.121 3771.82 22.16 OSF1.W 18580.00 7121.74 MINPT-O{OU 4048. 274.81 3883.18 3]71.88 22.16 0SF1.50 18600.00 7119.99 Minpf-Ctct 4040.47 276.40 3655.88 3]64.0] 22.00 OSF1.50 18910.00 7066.32 MInPI-O-SF 403913 276.30 3855.213783.43 22.00 0SF1.50 19020.00 ]035.48 MMPI -0 -ADP 4039.] 27&29= 3763.44 22.01 0SF1.50 19030.00 7032.38 MinPts 4039.72 277.05 3854.89 3782.6 21.9 0SF1.50 19180.00 69]9.91 MMRF 4039.69 277.04 3854.66 37W."l 21.94 0SF1.50 19200.00 6972.98 MinPa, 403989 277.04 3854.86 3762.64 21.94 OSF1.5D 19210.00 8968.10 MinPt-CtCt 4040.50 277.33 3855.29 37631721.93 0SF1.W 19380.00 6905.19 MmPt.OSF 4063.75 278.85 38]].5 3784.9 2t. OSFtW 19950.00 6655.79 Mlnpts 4066.52 278.85 3880.29 3)8].88 21.9fl OSF1.50 20050.65 6613.25 MMPI -O -SF H12-L05(Def Survey) Pass 4053.63 27393 3870.69 37)9)1 22.2] OSF1.50 17710.00 7126.21 MinP1-O-SF 4050.28 273.13 38678411 3777.131[---22M OSF1,50 17920.00 712376 MrPt-O-ADP 405024 273.11 3867.F 3])7.13 22.32 OSF1.50 17930.00 7123.84 MINPT-O-EOU 4050.2 273.09 3867.84 3777.14 22.32 0SF1.50 17940.00 7123.93 MmPt- Ct 4050.55 273.97 3887.58 3778.58 22.2 0SF1.50 18040.00 7124.84 MInPt-0SF 404980 273.86 388].03 3776.1 22.27 0SF1.50 18120.00 7125.57 MinPl43-AOP 404977 27362r 3887.0 F 3776.15 22.28 0SF1.50 18130.00 7125.88 MINPT-O-EOU 4049.7 273.58 3867.04 3776.17 22.26 0SF1.W 18140.00 7125.75 MmRP Ct 4050.01 275.W 3885.95 3774.41r==72011 0SF1.50 18390.00 7128.03 WR-OSF 4048]5 274.94 3863.13 3771.81 22.15 0SF1.50 18570.00 7122.54 MmP143-ADP 404fi72 274.8 3663.12 3771.82 22.16 0SF1.W 18580.00 7121.74 MINPTBEOU 4048.8 274.81 3863.16 377189 22.16 0SF1.W 18W0.00 7119.99 MmPt-CtCI 4040.47 276.39 3855.88 3764.08 22.0 OSF1.50 18910.00 7088.32 MmPt-O-SF 4039.73 276.30 385521 3763.44 22.00 OSF1.W 18020.00 7035.48 MMPI -O -ADP 4039.]3 276.2 385521 3763.44 22.01 OSF1.50 19030,0 7032.38 Minft 4039.]2 2P.04 385410 3762,47-71-911 OSF1.50 19180.00 6979.91 MmPt-O-SF 4039.89 277.04 3854.67 3762.65 r 21.95 OSF1.50 19200.W 697208 Minpls 4039.89 2]7.04 3854.87 3762.85 21.95 OSF1.50 19210.W 6968.10 Milpl- ct 4040.50 277.33 3855.29 3763.18 21.93 0SF1.50 193W.00 8905.19 MmPt-O-SF 4063.75 278.8 38]).52 3]8490 219 0SF1.50 199W.00 8855.79 MinPts 4068.52 278.85 3880.29 3787,61L__21 9 0SF1.50 20050.85 6613.25 MmPt- F Schlumberger -Private H12-106 (Def Survey) Pass 4053.63 273,93 38]0.68 377970 22.2 0SF1.50 17710.00 712621 MinPI-O-SF 4050.26 2]3.13 3867.840017.1 F 22.32 CSF1.50 17920.00 7123.75 MinPt-O-ADP 405024 273.11 3861. 37".12 22.32 OSFi.W 17930.00 7123.84 MINPT-O-EOU 0050.2 273.10 3867.84 3"7.14 22.32 0SF1.W 17940.00 7123.93 MinPt4YCt 4050.55 273.97 W15TS8 3776.58 22.25 0SF1.W 18(X0.8 7124.84 Min%-0SF 4049.80 273.67 3887.0 37]8.1 22.2] 0SF1.50 18120.00 7125.57 Min%-OADP 4049.71 273.6 3WS0 3]]6.14 22.28 0SF1.50 18130.00 7125.68 MINPT-O.EOU 4049.] 2]3.59 3887.04 37]6.1] 22.28 0SF1.50 18140.00 ]125.]5 MInPt-mt 405001 275.61 3865.84 3774.40J=22 0SF1.50 18390.00 7128.133 Min%-O-SF 4046.75 274.94 3863.13 3]71.81 22.15 0SF1.50 18570.00 ]122.54 Mln%-0-ADP 404672 274.90 3863.1F 3771.82 22.16 0SF1.50 18500.00 7121.74 MINPT-O-E0U 4046.8 274.81 3863.16 3771.88 22.16 OSFLM 18000.00 7119.99 Min%-Cla 404047 276.40 3855.88 37640) 22.N 0SF1.W 18910.00 7086.32 4039.73 276.30 3855.213763.43 22W 0SF1.W 19020.00 7035.48 Min%-OSF Min%-O-ADP 4039]3 276.2 385621 3763.44 22.01 0SF1.50 1803080 7032.38 Min%s 4039.72 2".05 3854.69 3762. 21. 0SF1.50 191W.W %79.91 Min%-O-SF 4039.69 277.00 3854.661 37E.64 21.94 0SF1.50 1928.00 %7298 Min% 4039.68 277.04 3854.8 37%.84 2194 0SF1.50 19210.00 N68.10 Min%-CtD 4040.50 277.33 3855.29 37%17 21.93 0SF1.W 193%.00 N05.19 Min%-0SF 4M.75 2]8.8 3877,5 37849 219 0SF1.W 19950.00 6655.79 Minpu 4066.52 278.85 38W.29 3787.66 21.95 0SF1.50 201350.65 6613.25 Min%-0-SF H12-L01 (Def Survey) 4064.29 2714 3863.00 3]92.84 22.54 0SF1.50 17710.00 7126.21 Pass 40%.10 276.34 3873.54 3]81.76 22.10 0.SF150 18270.00 MinPls 1126.94 MinPt-0-SF 4(X9.72 274.92 3866.11 22.17 0SF1.50 10030.00 ]116.9] MmPt-0-ADP 4049.22 317.61 3837.15 3]3181 19 JAN OS%5D 18740.00 7101.89 Mins 400.9.16 317.43 3837.21 3731.73 19.19 0SF1.W 18760.00 7098.47 Min%-CtCt 4216.35 298.14 4018.60 3920.21 21.42 0SF1.W 20050.65 6613.25 TO Survey) Pass 4496.69 176261 4378,811 432G.43111 38.50 0SF1.50 17710.00 7126.21 MinPls 556927 134.63 5479.14 5434.64 62.56 0SF1.50 20050.65 6613.25 TO H14PB2(Dat Survey) 0581.87 258.06 4389.47 4303.81 26.62 0SF1.50 17860.00 7123.21 Pass 0.559.71 258.14 4387,26 4301.57 26.60 0SFL50 18130.00 7125.66 Min%-0-SF 0.559.70 258.14 438].2 43015 .60 26 0SF1.50 18140.00 7125.75 Mine-O-SF 4563.94 258.95 439095 4304.9 26.54 0SF1.50 18470.W 7127.65 Min%s 4585.07 259.9 4391.39 430509 264 0SF1.50 186M.W 7118.9 Min%-O-ADP Min% 45]6.99 261.11 440250 4315.8 26.40 0SF150 19090.00 7012.72 MinPts 4581.33 377.98 4328.98 4203.35 18.23 0SF1.50 1938.00 N30.56 MinPls 480041 369.67 441347 4290.54 1895 0SH 50 2005065 6613.25 TO H14P81 (Def Survey) 4]00.41 255.0 453].07 4452.3 2779 0SF1.W 17]1000 7126.21 Pass 4679.15 282.19 4504.03 441fi 97 26.8 0SF1.50 18720.W 7105.09 MlnPls 4677.52 261,97r 4502,5411 4415. 2688 0SF1.50 18870.00 7076.02 MinPt-O-SF 46]].51 MTN 4502.55 4415.56 2688 0SF1.60 18800.00 ]073.6] Min%s Min%-aCt 48]899 263.51 4500.99 441348 26.72 0SF1.50 19150.00 W91.28 Min%43tCt 46".01 263.W 458.00 4413.44 26.71 0SF1.50 19170.00 N83.75 MINKE0U 46".05 263.61 458.98 4413.43 28.71 0SF1.W 1918.00 6976.02 Min%-O-ADP 46".38 263.7] 4501.21 4413.8 26.8 0SF1.W 19255.83 6949.23 Min%-0SF 4691]0 265.37 4614.46 4426.3 26.81 0SF1.W 19810.8 6714.97 Min%-O-SF 4702.09 266.10 4524.36 4435.99 26.60 0SF1.50 20050.65 6613.25 Min%-O-SF H14PB3 (Def Survey) Pose 0]]1.01 256.434599.73 4514.58 2&01 0SF1.50 1]]10.00 7126.21 Mins 4771.9 258.83 4596.99 4513.04 D.] 0SF1.50 18040.00 712484 MinP1-OSF 0"O.W 258.68 459].]8 451188 27.76 OSFtW 18200.00 712630 MInPI-CtCt 4"0.N 2W.74 4597.76 4511.84 27.76 0SF1.50 1E30.OD 7126.57 MINPT-0EOU 4770.61 258.79 469].]8 4511.83 27.75 0SFt.50 18250.8 7126.76 MlnPt-0-ADP 5shlumbareer-Private Survey) H14 (Def Survey) H14 (Det Survey) 4770.81 258.92 4597.87 4511.89 27.7 4775.57 260.80 4601.38 4514.7] 477556 260.] 4601.3 4514.] 27.57 4]75.56 288.79 4601.37 4514.77 27.57 4788.66 260.54 4614.64 4528.12 2].67 4780.29 267.51 460162 4512.78F 26.90 477964 267.42 4801. 4512.2 26.90 26740 460184 4512.24 26.91 4782.80 266.84 4604.58 4515.98 26.98 4834.10 48]8.52 4881.50 4883.02 4887.07 4889.97 4889.]6 4889.] 4882.50 468229 4882.20 4866.50 4901.60 4911.76 4911.80 4769.63 256.2 d598.4 4513.36 28.02 4769.68 258.30 4598.48 4613.Mp. 28.02 477249 258.80 4599.63 4513, 2])8 477088 258.56 4598.1 4512.32F 27.78 477086 25&54=F -65J-232 27.78 4]]0.85 258.52 4598.18 4512.33 27.78 4]]1.56 258.83 4598.81 4512.9 27.7] 4780.49 2W.01 4806.83 4520.49 2]88 4806.45 259.42 4633.17 4547.02 27.89 206,661 4695.31 4627.40 35.59 OSF1.50 18310.00 712].30 OSF1.W 18870.00 7112.21 OSF1.50 18880.00 7110.89 OSF1.50 1869D.W 7109.52 OSF1.50 19190.0 8978.02 OSF1.50 19780.00 6738.11 OSF1.50 19850.00 6696.07 OSF1.5D 19860.00 6893.84 OSF1.50 20050.85 6613.25 OSF1.50 20050.65 6613.25 OSFi.W 17710.OD OSF1.W 17780.W OSF1.50 17840.00 OSF1.50 17990.00 OSF1.50 18170.00 OSF1.50 18220.00 OSF1.50 18230.00 OSF1.W 19110.00 OSF1.W 19170.00 OSF1.50 19180.0 OSF1.50 1945000 OSF1.50 19810.00 DSF1.50 20040.00 OSF1.W 20050.65 OSF1.W 17550.W OSF1.50 17560.W OSF1.50 18010.2 OSF1.50 181 W.W OSF1.50 18170.00 OSF1.50 18180.00 OSFi.W 18320.00 OSF1.W 18700.00 OSF1.50 19250.37 7126,21 7123.83 7123.18 7124.38 7128.03 7126.48 7126.57 7005.77 6983.75 8979.91 6867.15 6714.97 6617.75 6613.25 7127.82 7127.88 7088.93 7052.91 702.10 704].25 7002.03 8845.83 6613.25 MinPt-OSF MinPl-OSF Min% MinPt-CICt MinPI-O-SF MMPI -O -SF MinPle MInPt-CtCI TD Pass MinPls Pass MInPu MmPN MmPt-O-SF MinPla WRSF MInPt-0-ADP Min% MmPt-OSF MInP MInPI-CtCt MinPt- SF MinPls MinPts MinPt-OSF MInft MmPt-O-SF MinPt-O-SF MInPt-D-ADP MINPT-O-EW MInPt-CtCt Min%-OSF MinPt-O-SF TD Pass 4054.13 252.26 4685.62 4601.8] 2897 OSF1.50 1690000 7126.64 4859.38 255.47 4688.74 42391 28.64 OSF1.50 16980.2 ]1244] MinPts 4860.52 256.30 4689.32 424.2 28.55 OSF1.W 17060.W 7124.51 MInP(s MinPt-O-ADP 4861.05 2N.76 468957 460631 28. OSF1.W 17110.2 7124.89 4871.55 2M.7 4700.0 1 4614.63 28.5 OSF1.50 174W.W 7127.42 MinPt-O-SF 4881.48 257.0 4]0976 4624.0 28.59 OSF1.50 1"80.00 7121.70 MinPts 4882.96 257.87 471072 462509 28.51 OSF1.50 17840.00 7115.80 MinPts 4886.97 258 71L 4714.1511 4628.2 28. OSF1.50 1792.00 7092.86 MinkF 4890.05 260.26 4716.22 46297 282 OSF1.W 18170.00 7050.10 Minft 4689.92 26D.W 4716.13 4629.7 28.29 OSF1.W 18200.00 7041.39 MlnPI-O-SF 4889.2 2W.1 4716.1 4629.73 28.29 OSFi.W 18210.W 7038.38 MinPI-O-ADP 4889.8 260.16 4718.13 4629)4 28.30 OSF1.50 18220.2 7035.32 MINPT-O{00 Min%-CICt 4891.92 2N,57 47128 4631.36 28.26 OSF1.50 16410.00 6967.89 4892.62 261.69 4717.83 4630,9j2j 28.1 OSF1.50 18530.00 6917.66 MinPls 489256 261.68 4717]8 4830. 28.15 OSF1.W 18560.00 6904.99 MlnP[CSF 4892.55 261.67 4]17]8 4630.89 28.15 OSF1.W 18570.00 620.78 MinPls 4894.]1 2834 4718.] 4631.3 27.97 OSFi.50 18960.W MinPl-Ct 6735.95 MinM 4894.83 263.43 471888 4631,401 27.9 OSF1.50 1210.2 6714.82 489871 263.27 4]228] 4635.44 28.01 OSFL50 19250.37 6613.25 Min% -0 -SF TD Pass 5134.23 204001 4996.51 4930231 38.69 OSF1.50 1925037 661325 MinPts 4878.67 253.82 4707.27 4623.0 28.95 OSF1.W 17190.2 6824.90 MinPl-OSF Xhlu nber8er-Private H14PB2 (Def Survey) H14PB3 (Def Survey) 4883.32 252.76 471449 4630.56 29.09 OSF1.50 17452.56 6713.25 70 19809 32.81 196.81 16529 N/A MAS =10.00 (m) 0.00 0.00 196. 32.81 196.81165.2 N/A MAS=10.00 (m) 30.00 30.00 S.68.Pass 198.09 32.81 196.81 165.29 152204.12 MAS =10.00(m) 35.25 35.25 mm% 188.32 32.81196.88 165,51 529.]9 MAS =10.00(m) 120.00 12000 WRP 192.81 32.81 187MI 159.aOl 46.37 MAS =10.00 (m) 950.00 947.99 MIN"-O{OU 192.84 32.81 188.98 180.03 41.91 MAS =10.00 (m) 1020.00 1016.79 Minft 213.82 32.81 203.62 181.0 23. MAS = MOD (m) 1500.00 1473.74 MIN"-O-EOU 347.75 3261 330.80 314.9 22.1 MAS =10.00 (m) 2390.00 2WIM MmR-OSF 352.41 3281 335.26 319.60 22.12 MAS =IOM (m) 241080 2215.45 MlnR-O-SF 871.06 57.21 832.49 81385 23 OSF1.50 4070.00 2978.83 MInPIASF MmR-O-SF 1225.17 ]3.39 1175.87 1151.7 2541 OSF1.50 5120.00 336869 MInR-O-SF 1887.24 119.33 1807.31 178]91 23.9 OSF1.50 7050.00 4086.52 2642.44 124.49 2559.06 251]9 321 OSF1.50 9310.00 4926.72 MmR-0 F 2]20.48 128.07 2634.72 2592.41 32.13 OSF1.50 954000 5012.23 MinR-0SF 2845.58 134.93 2755.25 2710.85 31.89 OSF1.50 981000 $149.79 Ming -O -SF 2979.17 142.16 2884.01 2837.00 316 OSF1.50 10310.00 5298.50 Ming -O -SF MmPt-O-SF 3125.56 149.53 3025.49 29780 31.5 OSF1.50 10]4000 545636 3572.94 176.19 3455,10 3398.7 30.6 OSFI.5D 12060.00 5"0.10 Ming-0SF MmR4 F 3852.30 180.23 3531.77 3472.0 30. OSF1.50 12300.00 6038.33 3915.85 184.24 3785.98 3721.61 30.41 OSF1.50 1306080 6320.87 MInPt-OSF 425811 216.30 4113.53 4041.81 29 fie OSF1.50 14070.00 8896.37 Ming-OSF 4474.02 228.68 4321.20 4245.35 2949 OSF1.50 14710.00 6934.30 Ming-0.SF 4569.30 233.45 4413.29 4335. 29.5 OSF1.50 15000.00 7033.03 MinR-0SF 4602.70 256.50r 4431. 4348.2 27.02 OSF1.50 18300.00 7113.36 MMR -O -SF 4588.82 251.82 4420,5 4337.0 2].45 OSF1.50 16830.00 6976.58 Minns 4588.79 251.79LL=="20.5M 4337.01 2745 OSF1.W 16840.00 6972.66 MinR-OADP 4588] 251.67 4420.61 433708 27.46 OSF1.W 1667000 6980.65 MINP.- EOU 4597.22 263.12 4428.11 43".10 27.35 OSF1.50 1]22000 6612.14 MInN-M 4594.39 253.46 4425.05 4340.92 27.3 OSF1.50 17430.00 6]22.84 MhPt-0.SF 4594.11 25341 4424.81 4340.]0 27.30 OSF1.60 17452.56 6713.25 MmR-O-SF Mift 19809 3281 19681 16529 NIA MA6=10.00 (m) 0.00 0 Pass.00 198.0 32.81 196.81 185. N/A MAS=10.00 (m) 3000 30.00 Surface 19809 32.81 19681 165.29 152204.12 MAS =10.00(m) 35.25 35.25 WPM 198.32 32.81196. 165.51 529.79 MAS -10.00(m) 120.00 12000 WRP 192.81 32.81 187.20 15980 48.37 MAS =10.00(m) 950.00 947.99 MINP7-O-EOU 192.84 32.81 im."I 160.03 41.91 MAS =10.00(m) 1020.00 1016.79 mm is 213.82 32.81 203.62 181.0 23.8 MAS =10.00(m) 1500.00 1473.74 MINPT EOU 347.75 32.81 330.80 314,N 22.1 MAS =1000 (m) 239D.00 2201.58 Ming -O -SF 352.41 32.81 335.25 319.60 22.12 MAS =10.00 (m) 2410.00 2215.45 Ming -O -SF 871.06 57.21 832.49 813.65 233 OSF1.50 4070.00 2978.83 WnR-0.SF 1225.17 73.39 1175.87 11511 2541 OSF1.50 5120.00 3388.99 MInR-0 F 1887.24 119.33 1807.31 1767,91 239 OSF1.50 7050.00 4088.52 MmR-0 F 2842.44 124.49 2559.06 2517.94 32.12 OSF1.50 9310.00 4928.]2 Ming-OSF 2720.48 128.07 2634.72 2592.G 32.13 OSF1.W 9540.00 5012.23 Ming-OSF 2845.58 134.94 2755.25 2710.65 31.89 OSF1.50 991000 5149.79 Ming-0.SF 2979.17 142.16 2684.01 2837.00 31.5] OSF1.50 10310.00 5298.50 Ming -O -SF 3125.56 149.53 3025.49 2976.02 316 OSF1.50 10740.00 5458.38 MInR-O-SF MmR43SF 3572.94 176.20 345509 3396.7 30.6 OSF1.50 12080.00 5949.10 3852.30 180.24 3531.77 34n.07 30.5 OSF1.50 12300.00 6038.33 MInR-0SF 3915.85 194.24 3785.98 3721.61 30.41 OSF1.50 lW60OD 6320.87 Ming-OSF 4258.11 216.30 4113.53 4041.81 29.68 OSF1.50 1487000 6696.37 MhPI-O-SF 44]4.02 228.68 4321.19 4245.34 2948 OSF1.50 14710.00 8934.30 Ming -O -SF 4589.30 233.45 4413.29 4335.85 294 OSF150 15000.00 7033.03 MmR-O-SF 4688.46 247.18 4533.31 445128 28.63 OSF1.50 15550.00 7125.57 WnR4 SF 4724.39 247.39 4559.13 "77 00 28.75 OSF1.50 15780.00 7128.25 Mins 4729.62 246.45 458365 "8116 28.6fi OSF1.50 15830.00 7128.25 MInR-"F 4745.68 251.99 45]ZS "93.89 2836 OSF1.W 16000.00 7128.25 Ming-0SF 4755.04 253.17 4585.93 4501.8] 28.28 OSF1.50 1630000 7113.38 MInft Ming -D -SF YhlumbeM,P&ate H16A-LO](P3)(Oaf PMn) H16 (Def Survey) H16A-L01(P3)(Oaf Plan) 4761.93 252.18 4593.48 4509..75=28 OSF1.50 18470.00 ]084.85 4761.34 251.87 4593.0911 45094 1 28.46 OSFI.5D 16570.00 7051.23 MmRP F 4761.31 251. 4593.0 4509.4] 28.48 OSF1.W 16580.60 7058.59 MinN-0-ADP 4]81.26 251.70 4593.13 4509.N8 OSF1.50 OSF1.50 1662000 ]04].53 MINPT-0-EOU 4781.38 251.] 4813.2 4529. 28.8 OSF1.50 1]320.00 6769.82 Min%-Clct 4784.69 251.65 4816.59 4533.04 28.63 OSF1.W 17452.56 6713.25 MlnPls TO Pass 238.13 32.81 236.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 238.13 32.81 236.84 205.32 144748.39 MAS=10.00 (m) 35.25 35.25 Surface 23].31 MAI 234.95 204.50 219.92 MAS =10.00 (m) 220.00 220.00 WRP 23].3532.81 234 SOL 204.54 199.69 MAS =10.00 (m) 240.00 240.00 MinPls 285.11 32.81 258.90 23231 53.54 MAS =10.00(.) 980.00 957.84 MINPT-O-EOU 285.14 32,511L_2N.8811 232.34 52.99 MA5=10.00(.) 970.OD 987.69 WPM 304.50 32.81 294.10 271.6122 MAS=10.60(.) 1500.00 1473.74 MINPT-0EOU - ]63.28 131.95 721.59 ]01.32.8 OSHM 4320.00 30]1.5] MhPI-6SF 827.83 66.69 ]82.99 761.1.9 OSF1.50 4650.00 3194.26 MmPt-O-SF 1358.]1 122.48 1278.89 1236.257 OSF1.50 7050.00 4088.52 MInPI-O-SF 1496.9] 102.59 1428.21 139431 OSF1.W 7720.00 4335.60 MlnPt-OSF 1562.67 106.99 1490.97 1455.61 OSFt50 8040.00 44.54.5] MInPI-OSF 15]].30 107.97 1504.94 14693313 OSF1.50 8110.00 4480.60 MinM-O-SF 1600.31 109.76 1526.]] 1490.560O5F1.50 8220.00 4521.49 MmPt-O F 28]8.89 235.00 2]21.85 284384 OSF1.50 14520.00 8863013 MInPt-O-SF 2911.35 23].50 2]5264 26]3.84] OSF1.5D 14880.00 6923.15 MinR-"F 3025.8] 242.45 2883.91 2783.4279O5F1.W 15200.OD 7081.74 MinR-OSF 308].19 289.8 2893. 2]9].0 OSF1.60 15530.00 7121.51 MmM-OSF 290.98 2907.99 2811.320 OSF1.50 15680.2] ]128.25 MinPls3102.30 3162.49 297.48 2963.86 2665.00 OSF1.50 163W.00 ]113.36 MmPt-O-SF 3206.91 305.09 3003.19 2901.8281 OSF1.5D 17050.00 6884.43 MMR-OSF 3210.90 292.38 3015.68 2918552 OSF1.W 17120.00 8854.86 MinPt-OSF 321710 294.]1 3020.3 2922.342 OSFi.60 17230.00 6607.89 MIOPMOSF 3221.79 294.46 3025.15 2927.33 16.46 OSF1.50 17452.58 6713.25 MinPls TD 235.13 32.81 238.84 205.32 WA MAS =10.00 (m) 0.00 0.00 Pass 238.13 32.81 238.84 205.32 144]48.39 MAS =10.00(m) 35.25 35.25 Surface 23].31 32.81 234.95 204.50 219.92 MAS =10.N(m) MOM 220.00 WRP 237.35 32.81 234.88 204.54 199.89 MAS =10.00 (m) 24000 240.00 MinPls 265.11 32.81 25&921 232.3111 53.54 MAS=10.00 (m) 9W.00 957.84 MINPT-O.EOU 285.14 32.81 258. 232.30 5299 MAS =10.00 (m) 970.00 987.89 MlnPts 304.50 32.81 294.10 271.8 33 22R MAS =10.00 (m) 1M0.00 14]3.]4 MINPT-O-EOU 763.26 62.00 721.56 701.2 1878 OSF1.W 4320.00 30]1.5] MmM-OSF 827.83 W.73 782.96 761,09 18.90 OSFi.W 465000 3194.26 MinPt-OSF 1358.71 122.52 1276.65 1236.19 16.]8 OSF1.50 70W.60 0086.52 MiaPt-O-SF 1496.97 102.68 1428.14 1394.29 220 OSF1.50 772000 4335.W MlnPt-O-SF 192.67 107.119 1490.90 14W58 22.11 OSF1.5D 8040.00 4454.57 MInPt-"F 15]].30 108.W 1504.87 W9 22 22.11 OSF1.W 8110.OD 4080.60 MinPI-O-SF 1WD.31 109.87 1528.69 1490.45 22.06 OSFi.W 8220.00 4521.49 Min% -O -SF 2878.89 235.27 2]21.6] 2643.62 1823 OSF1.50 1452000 6863.W MinPt-O-SF 2911.35 237.77 2752.8 2873.58 I&A OSF1.50 146N.00 8923.15 MlnPt-O-SF 2989.86 248.6 2823.] 2741.1 18,11 OSF1.50 15060.00 7054.54 MmPt-OSF 3039.57 250.70 2872.11 27W,88 18.2 OSF1.50 15660.27 7128.25 MinPb 3048.18 251.10 2860.5 2797,0 182 OSF1.50 15850.60 7128.25 MmPI-0 F 3079.58 250.70 2912.12 2828.88 18.4 OSF1.W 16NO.OD 7113.36 MinPI-O-SF 3090.87 249.05 2924.51 2MI.82 16.85 OSF1.50 16050.60 7088.97 Mint-OSF 31089 251.4 2940.] 285].2 1861 OSF1.50 1M00.60 W72.M MinPt-O-SF 3109.03 251.9 2940.]2 2857.06 185 OSF1.50 16910.00 6M.W Minft 3120.57 250.8 2953.26 2870.10 187 OSF1.50 17300.00 6]]8.12 MIam 3128.06 250.28 2960.88 2877.78 18.62 OSF1.W 17452.56 6713.25 MlnPt-O-SF TO 238.13 32.81 236.84 205.32 NIA MAS = 10.00 (m) 0.00 0.60 Pass 238.13 32.81 236.84 205.32 104748.39 MAS =10.00 (m) 35.25 35.25 Surface 23].31 32.81 230.95 204.50 219.92 MAS =10.00 (m) 220.00 220.00 WRP MinPts khlumberger-PrWte H16A-L94 (P3) (DO Plan) H15A-L06 (P3) (DO Plan) 237.35 32.81 234.88 204.54 199.69 MAS =10.00(.) 240.00 240.00 285.11 32.81 258. 232.31 53.54 MAS =10.00(.) 980.00 957.84 MINPT4 EOU 265.14 32.81 2588 232.34 52.99 MAS =10.W(m) 970.00 987.69 MmRs 304.50 32.81 294.10 271.61 MAS =10.00 (m) 1500.00 1473.74 MINPT-O.EOU 763.26 61.95 ]21.59 701.32 188 OSF1.50 4320.00 3071.57 Ml,,R4}SF 827.83 66. 69 782.99 761,1 16.92 OSF1.50 4650.00 3194.26 MhPt-0.SF 1358.71 122.46 1278.89 1236.2 16.78 OSF1.W 7050.00 4088.52 MinPt-0-SF 1496.97 102.59 1428.21 1394.3$ 22.1 OSF1.W 7720.00 4335.60 MmPt SF 1562.67 108.99 1490.97 W6.1a 22.13 OSF1.50 13040.00 4454.57 MinPt-0SF 1577.30 107.97 1504.94 1469.X 221 OSF1.50 8110.00 4480.80 MinPt-0.SF 1600.31 109.76 1526.77 1490.5 220 0SFL50 8220.00 4521.49 MmR43.SF 2878.89 235.0 2721.85 26Q.85 184 OSF1.50 14520.00 8863.86 MInPt-0SF 2911.35 237.50 2752.64 26]3.85 18.4] OSF1.7 14680.00 6923.15 MInR43SF 3025.87 242.45 288391 2783.42 18.79 0SF1.W 15200.0 7081.74 MInN-0SF 3087.19 289.8 2893. 2]97.36 1603 OSF1.50 15530.00 7124.51 Ming-OSF 3102.30 280.98 290].99 2811.32 1604 OSF1.50 1567.27 7128.25 MlnP 3162.49 297.46 2963.86 2865.0 16.00 OSF1.50 163W.00 7113.36 Ming-0.SF 3206.91 305.09 3003.19 2901.82 1581 0SF150 17050.00 8884.43 WnPt0.SF 321].1 297.15 3018.] 29200 16.2 OSF1.50 17452.56 6713.25 MmPt4 F MinPk 238.13 3281 236.84 205.32 NIA MAS =19.90(.) 9.90 0,09Pass Su ace 238.13 32.81 238.84 205.32 144748.39 MAS=10.00 (m) 35.25 35.25 23].31 32.81 234.95 204.50 219.92 MAS =10.00 (.) 220.00 27.7 WRP 237.35 32,81[_234 UL 204.54 193.69 MAS =10.00 (m) 240.00 240.00 Mins 285.11 32.81 258.90 232.31 53.54 MAS =10.00 (m) 980.00 957.84 MINPT-O-EOU 285.14 32.81 258.88 232.34 52.99 MAS =10.00 (m) 970.W 967.69 Min% 304.50 32.81 2NA0 271.6 33.28 MAS=10.W(in) 1500.7 1473.74 MINPT-0-EOU 763.26 61.95 721.59 701.32 18.80 OSF1.50 QW.W 371.57 Ming -O -SF MiiiPt-0.SF 827.83 66.89 782.99 761.1 18.92 OSF1.50 4850.00 3194.26 1358.71 122.46 1276.89 1238.25 167 OSF1.50 7050.00 4088.52 MinPt-0SF 1498.97 102.59 1428.21 13N3 22.12 OSF1.W 7720.00 4335.60 MinR-0SF 1562.67 108.98 14W.97 1455.6 22.13 OSF1.7 8040.00 4454.57 Mir PI-0SF 1577.30 107.97 1504.94 1469.33 22.13 0SF1.7 8110.7 N80.60 Minh-0.SF 19W.31 1W76 1528.77 1490.58 22.0 OSF1.50 8220.00 4521.49 MmPt4 SF 2878.89 235.00 201.85 2843.89 18. OSF1.50 14520.00 8863.86 MsPW-SF 2911.35 237.W 2]52.64 2873.85 18.4 OSF1.50 14660.00 8923.15 MInN-0SF 3025.87 242.45 2863.91 2783.4 18] OSF1.7 15200.00 708114 MInPt-OSF 3087.19 289.82 2893. 278].3 1603 OSF1.7 15530.00 7124.51 MInPt-OSF 3102.30 2W.W 277.99 28113 16.0 0SF1.W 15660.27 7128.25 Min% 3182.49 297.46 2963.86 26650 18.0 OSF1.50 16300.7 7113.36 Minh-OQSF WnPt0.SF 327.91 305.09 3W3.19 271.82 1581 OSF1.50 1707.00 8884.43 3210.90 292.36 3015.7 291854 16.5 0SF1.50 17120.00 8854.7 MInPt-0SF 3217.10 294.71 3020.30 2922.3 16.42 OSF1.50 17230.00 687.89 Minln SF 322119 294.48 302515 2927.33 16.46 0SF1.7 17452.56 6713.25 MsPls TD 238.13 32.81 236.84 205.32 NIA MAS =1090 (m) 09 0.00 Pass0 238.13 32.81 236.84 205.32 144]48.39 MAS =10.00 (m) 35.25 35.25 Surface 23].31 32.81 234.95 204.50 219.92 MAS =10.00(m) 220.00 220.00 WRP 237.35 32.81 234.88 20454 199.69 MAS=10.00 (m) 240.00 240.00 MmPls 265.11 32.81 2589 232.31 53.54 MAS =10.7 (m) 960.00 8.57.84 MINP7-0-EOU MlnP 265.14 32.81 258.8 232.34 52.99 MAS =10.W(m) 970.W 987.69 304.50 32.81 294.10 271.6 33.26 MAS =10.00 (.) 1500.7 1473.74 MINPT-O-EOU 763.26 61.95 721.59 701.32 18.80 OSF1.50 4320.7 3071.57 NnR-0.SF 827.83 66.69 782.99 761.1 18.9 OSF150 487.00 3194.26 MInPt-0-SF Minh-OSF 1358.71 122.46 1276.69 1236.25 161 OSF1.50 707.00 4086.52 MmR-0SF 1498.97 102.59 1428.21 1394.3 22.1 OSF1.W 7720.00 4335.60 MmR-0SF 1562.67 106.99 147.97 1455.6 22.1 OSF1.7 74D00 4454.57 1577.30 107.97 1504.94 1469.3 22.1 OSF1.7 8110.W 4480.60 MlnPI-0-SF 16W.31 17.76 1526.77 1490.5 22.0 OSF150 8220.W 4521.49 Minh-0.SF 2878.89 235.00 2721.85 2643.6 18. O NZO 14520.00 6883.66 MMPt-0.SF 2911.35 237.50 2752.64 2673.8 18.4 OSF1.50 1467.00 8923.15 MinR SF 3025.87 242.45 2863.91 2763.4 18.7 OSF1.50 15200.OD 7081.74 MmR4 F Ming -04F Schlumberger -Private 3087.19 289.8211 289164 2780.3 160 0SF1.W 15530.00 7124.51 3102.30 29098 2907,99 2811.32 18.0 OSF1.W 15660.27 7128.25 Min% 3162,49 297.46 2963.86 2865.04 16.00 OSF1.50 18300.007113.W MmPt-0-SF MmPt-OSF 3208.91W5.09 3003.19 2901.82 15.81 0SF1.50 17050,00 8884.43 MmPtO-SP 3210.90 292.36 3015.66 291854 1652 0SF1.50 17120.00 8854.88 3217.10 294.71 3020.3 2922.3 16.42 0SF1.50 17230.00 6807.89 MInPIOSF 3221.]9 29448 3025.15 2927.33 16.46 OSF1.50 170.52.56 6713.25 Min% TO H1 A -L02 (P3) (Def Plan) �--s�.-.-------ry�---g, _ -- -- - 238.13 32.81 238.84 205.32 NIA MAS = 10.00 (m) 0.00 0.00 238.13 32.81 236.94 205.32 14474839 MAS =1000 (m) 35.25 35.25 Surface 237.31 32.81 234.95 204.50 219.92 MAS =1000 (m) 220.00 220.00 WRP MNP6 237.35 32.61 234.88 ]04.54 199.89 MAS=10.00 (m) 240.00 240.00 285.11 32.81 258. 232.31 53.54 MAS =10.00 960.00 MINPTOEOU (m) 957.84 Mlnft 265,14 32.81 258.8 232.34 52.99 MAS =10,001m) 970.00 987.69 MINPT-0-E01J 304.50 32.81 294.10 271.69 33.2 MAS=10.001m) 1500.00 1473.74 763.26 61.95 ]21.59 701.32 18.8 0SF1.50 4320.00 3071.57 MlnPt-O-SF 827.83 66.69 ]82.99 761.1 18.9 0SF1.50 4650.00 3194.26 _ MmPt-O-SF MInPtOSF 135831 122.48 1276.69 12362 16.7 0SF1.50 7050.00 4086.52 _ 1498.97 102.59 1428.21 1394.3 2212 0SF1.W ]]20.00 4335.80 MInP[OSF MInPt43-SF 1562.87 105.99 1490.97 1455,6 22.13 OSF1.W 8040.00 4454.57 1577.30 107.97 1504.94 1469.33 22.13 OSF1.W 8110.00 4480.60 MInPI-OSF 1600.31 109.]6 1526.77 1490.58 22.08 OSF1.50 822000 4521.49 MinPI-O-SF 2878.89 235.00 2721.85 2843.8 18. OSF1.50 1452000 6883.88 Min% -O -SF 2911.35 237.50 2752.64 2673.85 184 0551.50 14680.00 11923.15 MInPtOSF MmPtOSF 3025.87 242.45 2863.91 27634 187 0SF1.50 15200.00 7081.74 3087.19 289.82 2893. 2797.3 16.03 OSF1.W 15530.00 7124.51 MlnPt-OSF 3102,30 290.98 2907.99 2811.32 16.04 OSF1.W 15860.27 7128.25 Min% 3162.49 29]46 2963.86 2885. 1800 OSF1.50 16300.00 7113.36 MlnPI-OSF 3208.91 305.09 3003.19 2901.82 15.81 OSF1.50 17050.00 6884.43 MmPt-O-SF 3210.90 292.38 3015.% 2918.5 16.5 0SF150 17120.00 8854.86 WnRI SF 3217.10 29411 3020.30 2922.39 184 0851.50 17230.00 8807.89 MmPtOSF 3221.79 294.8 3025.15 2927.33 1646 OSFI 50 17452.56 6713.25 MinP1s TO H16A-LO(P3)(Oef Pian) 238.13 32.81 236.84 205.32 NIA MAS = 10.00 (m) 0.00 0.00 Pan 8urtace 236.13 32.81 236.84 205.32 144748.39 MAS =10.00 (m) 35.25 35.25 237.31 32.81 234.95 204.50 219.92 MAS =10.00 (m) 220.00 220.00 WRP 237.35 32.81 234.88 20454 199.69 MAB=10.00(m) 240.00 240.00 MlnPfs 265.11 32.81 258. 23231 53.54 MAS =10.W(m) 980.00 957.84 MINPTOEOU 265.14 32.81 2588 232.30 52.99 MAS =10.W (m) 970.W 967.69 MlnP 304.50 32.81 294.10 271.6 33.26 MAS =10.W(m) 150080 1473.74 MINPTOEOU 763.26 61.95 721.59 701.32 1880 OSF1.50 4320.80 30]1.57 MinPt-OSF 827.63 66.69 782.99 761.14 18.9 0SF1.50 4850.00 3194.26 MlnPt-O-SF 1358.71 122.48 1276.89 12362 i6.] 0551.50 7050.00 4086.52 MInPI-O-SF 149(1.97 102.59 1428.21 1394.3 221 0SF1.50 7720.00 433580 WnPt-O-SF 1582.67 106.98 1480.97 1455.6 22.1 OSF1.W 8040.00 4454.57 MlnPI-OSF 1577.30 107.97 1504.94 1469.3 2213 OSF1.W 8110.00 4480.60 MInPt-OSF 16W.31 1W.76 1526]7 1490.56 22.80 OSF1.50 8220.W 4521.49 MinPt-OSF 2878.89 235.00 2721.85 2843,89 18.4 OSF1.50 14520.80 8863.88 MhPt-O-SF 2911.35 237.50 2752.64 2673.85 18. OSF1.50 14880,00 8923.15 MInPt-O-SF MmPIOSF 3025.87 242.5 2863.91 2783.4 181 0551.50 152W.00 7081.74 3087.19 289.82 289364 2797.m 160 0SF1.50 15530.00 7124.51 WnRI SF Minft 3102.30 290.96 290299 2811.32 1604 0SF1.50 15660.27 7128.25 3162.49 297.46 2963.88 2865,04 0SF1.50 MmPt-0SF 18300.00 7113.36 MmPtOSF 3206.91 305.09 WW.19 2901.82 1561 0SF1.% 17050.00 6884.43 3210.90 292.36 3015.66 2918.5416.52 OSF1.50 17120.W 6854.88 MinPt-OSF 3217.10 294.71 3020.3 292239 16.42 OSF1.50 17230.80 6807.89 MlnPI-OSF MinWs 3221.79 29446 3025.15 2927.33 1646 OSF1.50 1745256 6713.25 TD 1116A-1.03(P3)(Def Plan) 236.13 32.81 238.84 205.32 WA MAS 10,00 (m) 0.00 000 Pass Surface 238.13 32.81 238.84 205.32 144746.39 MAS=10.00(.) 35.25 35.25 WRP Schlumberger -Private 23].31 32.81 234.95 204.50 219.92 MAS=10.00(m) 220.110 220.00 MinPln 23].35 32.81 234.88 204.54 199.69 MAS=10.00 (m) 240.00 240.OD MINPT-O-EOU 285.11 32.81 258.9 232.31 5354 MAS =10.00 960.00 (m) 95].84 MinM 265.14 32.81 258.88 232.34 52.99 MAS =10.00 (m) 970.00 967.69 MINPT-O.EOU 304.50 32.81 294.10 271 69 33.2 MAS =10.00 (m) 1%0.00 14]3.]4 Mss -O -SF 763.26 61.95 721.59 70132 18.80 OSF1.50 4320.00 30]1.5] MInPt-O-SF 827.83 66.69 78299 ]61.14 18.92 OSF1.50 4650.00 3194.26 MlnPI-OSF 1358.71 122.46 1276.69 1236.25 16.78 OSF1.50 7050.00 4086.52 Mint-OSF 1498.97 102.59 1428.21 1394.39 22.12 OSF1.50 ]720.00 4335.60 MInPt-0.SF 1562.67 106.99 1490.97 1455.69 2213 OSF1.50 8040.00 4454.57 Mint -O -SF 15]7.30 107.97 1504.94 1469.33 22.1 OSF1.50 8110.00 448D.% MmR-O-SF 1800.31 109.76 1528.]7 1490.56 22.0 OSF1.50 8220.00 4521.49 MMRF 2878.89 235.00 2721.85 26438 18.4 OSF1.50 14520.00 6863.88 MinR-0SF 2911.35 237.50 2752.64 2673.8 18.47 OSF1.50 14880.00 6923.15 MMR-OSF 3025.87 242.0.5 2883.91 2783.42 18.7 OSFI.% 15200.OD 7081.74 MMR-OSF 3087.19 289. 2893. 2]913F 18.03 OSF1.% 1553090 7124.51 MhMs 3102.30 290.98 29DZ99 2811.32 16.04 OSFI.% 15860.27 7128.25 MinM-OSF 3162.49 297.46 2963.86 2865.04 16.00 OSF1.50 1830090 7113.36 Min%-0.SF 3206.91 305.09 3003.19 Ml.Ul 15.81 OSF1.50 17050.00 6884.43 MhR-0.SF 3210.90 292.38 3D15.% 2918.54 16.52 OSF1.50 17120.0 8854.68 MMR-0.SF 3217.10 294.]1 3020.302922.39 16.42 OSF1.50 17230.00 %7.89 Minft 3221 ]9 29446 3025.15 2927.33 16.46 OSF1.50 17452.56 6713.25 TD H16A(P3)(Dd Plan) Pass 238.13 32.81 236.84 205.32 NIA MAS =10,00 (m) 0.00 0.00 Surtace 238.13 32.81 236.84 205.32 144748.39 MAS =10.00 (mj 35.25 35.25 WRP 23].31 32.81 234.95 204.50 219.92 MAS =10.00(.) 220.00 220.00 Minft 237.35 32 * 811 234% 204.54 199.69 MAS =IOM (m) 240.00 240.00 MINPT-O.EOU 265.11 32.81 258.Al 232.31JI 53.54 MAS =10.00 (m) 960.0 957.84 Minft 2%.14 3Z81L__L68.8jj 232.34 52.99 MAS =10.00(m) 970.00 967.89 MINPT-O-EOU 304.50 32.81 294.10 271,69 33.2 MAS -10.00(m) MOM 14]3.]4 MmMP SF ]63.28 61.95 721.59 7013 18.8 OSF1.50 4320.00 3071.57 MMR.OSF 827.83 %.89 782.99 761.1 18.92 OSF1.00 4%0.00 3194.26 MinPt-OSF 1358.71 122.46 127689 1236.25 16]8 OSF1.50 ]050.0 4%6.52 1496.9] 102.59 1428.21 1394.3 22.12 OSF1.50 ]]20.00 4335.% Mine -O -SF 1582.87 10.99 1490.97 1455.6 22.13 OSF1.50 8010.00 4459.57 Mint-0.SF 157].30 17.9] 1504.94 1469.33 22.1 OSF1.50 8110.00 4480.60 MinPt-0.SF MnPt-0.SF 1%0.31 109.76 1526.]] 1490.5 22.0 OSF1.9O 8220.00 4521.49 MInP(-"F 2878.89 235.00 2]21.85 26438 18.4 OSF1.50 14520.00 6883.68 MinPt-"F 291135 237.% 2752.84 2673.8 18.4 OSF1.5D 14%0.00 6923.15 MInPt-"F 3D25.8] 242.0.5 2863.91 27834 18. OSF1.50 15200.00 7081.74 MmM.OSF 308].19 289. 2893.6 2]00.3 16. OSFI.% 15%0.00 7124.51 Minft 3102.30 290.98 297.99 2811.3 16. OSFI.% 15%0.2] 7128.25 Min%-0.SF 3162.49 27.46 290.86 2%5.0 16.00 OSF1.00 1%00.00 7113.36 MmMt SF 3206.91 305.09 3003.19 2901.82 15.81 OSF1.50 17050.00 %84.43 MlnPI-0.SF 321090 292.36 3015.% 2918.5 16.5 OSF1.50 1]120.00 %54.% MinRt SF 3217.10 294.]1 3020.30 2922.39 16.4 OSF1.50 17230.00 %7.89 MinNs 3221.79 294.46 3025.15 2927.33 1646 OSF1.50 17452.56 6713.25 H16P8l(Det Survey) Pass 238.13 32.81 238.84 20532 NIA MAS =10.00 (m) 0.00 0.00 Surface 238.13 32.81 23684 205.32 144748.39 MAS =1O.OD J.) 35.25 35.25 WRP 23].31 32.81 234.95 204.50 219.92 MAS =10.00(m) 220.0 MOO Minft 237.35 32.81234.88 204.54 199.% MAS =10.00 (m) 240.00 240.OD MINPT-OSOU 265.11 32.81 258.9 232.31 53.54 MAS =10.00 (m) 9%.00 957.84 MinNs 265.14 32.81258. 232.34 52.99 MAS =IOM (m) 970.0 97.69 MINPT-O-EOU 304.50 32.81 294.10 27159 33.2 MAS =10.00 (m) 1500.00 1473.74 MMR-OSF 763.28 62.00 721.% 701.27 18.7 OSF1.50 4320.00 30]1.5] MInR-"F 54hlumberger-Prlvate Schlumberger -Private 827.83 66.73 782.98 761.09 18.90 OSF1.50 4650.00 3194.26 MinPt-O-SF 1358.71 122.52 1276.65 1236.19 16.78 OSF1.50 7050.00 4086.52 WR-O-SF 1496.97 102.88 1428.14 1394.2 22,0 OSF1.50 7720.00 433560 Min%-O-SF 1562.67 107.09 1490.90 1455.58 OSF1.50 8040.00 4454.57 Min%-I SF 1577.30 108.08 1506.87 1469.2 22.11 OSF1.50 8110.00 4480.60 MInlat-O-SF 1800.31 109.87 1526.69 14M.45 OSF1.50 8220.00 4521.49 Min%43-SF 2878.89 235.27 2721.67 264162 OSF1.W 14520.00 6883.86 Min%-OSF 2911.35 237.77 2752.46 2673.5 18.45 OSF1.W 14680.00 6923.15 Min%-0-SF 2989.86 248. 2823.] 2]41.1 18.10 OSF1.50 15080.00 7054.54 MinPts 3039.57 250.70 2872.11 2786.88 18.25 OSFI.W 15880.27 7128.25 MisP.- F 3048.18 251.10 2650.45 2797.08 18.27 OSF1.50 15560.9 7128.25 Min%-O-SF 3079.58 250.70 2912.12 2828.88 18,49 OSF1.M 18300.9 7113.38 MIOPI-6SF 3090.87 249.05 2924.51 2841.82 18.66 OSF1.50 115450.00 ]088.9] Min%-O-SF 3108.69 251.4 29403 1 2857 271E 1661 OSF1.50 18840.00 897288 MlaRs 3108.03 251.96L=2940.72 285).06 18.5 OSF1.50 16910.00 6943.98 Minft 3120.57 250.48 2953.26 2870.101L_18.) OSF SO 1739.00 6778.12 Min%-OSF 312806 250.28 2960.88 2877.78 18.82 OSF1.50 17452.56 6713.25 TO Slanchkof State 1 (Def Survey) Pass 13221.03 32.61 13219.74 1316822 WA MAS =10.00(m) 0.00 0.00 SuAace 1322075 32.81 13219.44 1318) 94 446348.65 MAS =10.00 (m) 35.25 35.25 W RP 13220.47 32.81 13218.38 1318].6 16316.95 MAS =10.00 (m) 250.00 25000 MInp 13190.34 3281 131]].81 1315].53 1173.7 MAS =10.00 (m) 910.9 96.51 Min%-O-SF 1391.9 32.81 13083.91 13048.25 826. MAS =10.9 (m) 1380.9 1362A9 Min%-O-SF 12815.07 37.17 12789.81 12777.90 53].91 OSF1.50 1980.9 1890.)) Min%-O-SF 11404.74 49.45 11371.10 11355,29 OSF1.50 3830.9 2889.41 MInPt-O-SF 9911.48 66.17 9886.36 9845.29 235.2j OSF1.50 5600.9 3547.44 MinPt-O-SF 8728.83 81.11 8673.46 8647.721 169.0 OSRSO TOW.9 4086.52 Min%s 7496.88 80.29 7443.54 7418.40 1 1490 OSF1.50 8640.00 4877.84 Min%-O-SF 5559.93 126.05 5473.94 5433.87 F---s-g.-311 OSF1.50 11550.00 5759.W MInP(-O-SF 4528.56 182.52 4405.77 4345.04 OSF1.50 142211.00 6752.13 Min%-0SF 4350.70 2110.81 4216.45 4149.8A O5F1.50 157W.00 7128.25 Min%{)SF 4339.12 200.31 4205.21 4138.81 OSF1.M 1587(1.00 ]128.25 Min%40SF 4330.99 199.97 419].31 41310 OSF1.M 15970.00 7128.25 Min%-0SF 4326.14 199.76 4192.60 4126.3 OSF1.W 16050.W 7128.25 Mine-OSF 4320.98 199.59 4187.54 4121.3 OSF1.W 16180.00 7124.53 Min%-OSF 4319.58 199.57 41 W.18 4120.01 OSF1.W 16240.9 7119.87 _ Min%-OSF 4318.59 199.48 4185.23 4119.11 OSF1.M 1890.9 7113.36 MsPts 4318.29 195.5 418].5 4122.70 33.30 OSF1.W 16330.9 7109,40 MINPT-O OU 4318.10 195.02 4187.71 4123.08 33.40 OSF1.50 16380.9 7101.78 Mine-=t 440420 180.34 4283.60 4223.86 36.85 OSFlS0 17452.9 6713.25 TO CosmoNlilan State 1 (Def Survey) Pass 18223.16 3281 18221.18 18190.35 NIA MAS=10.00 (m) 000 0.9 Surface 18223.13 32.81 1822115 18190.32 NI MAS =10.00 (m) 20.00 20.00 WRn -SF 18223.12 32.81 18221.1 18190.31 NIA MAS =10.9 (m) 30.9 39.W MINPT-O-EOU 18223.12 32.81 18221.14 18190.31 NIA MAS =10.W (m) 35.25 36.25 WRP 18038.42 3281 15029.76 15005.62 2721.9 MAS =10.00(m) 1500.00 1473.74 Min%-OSF 13688.31 65.42 13693.10 13622.89 3386 OSF1.50 7050.00 4086.52 MinPb 1192.49 81.60 10945.64 10920.8 222.1 OSF1.50 10410.00 5335.67 Min%-0-SF 8182.55 151.04 8078.61 803160 86.75 OSF1.50 14460.00 6841.36 Min%43SF 692233 182.67 6797.40 6739.8 59.6fi OSF1.W 1639.00 7113.36 Min%-OSF 6158.12 1W.20 8026.61 5965.92 50.65 OSF1.W 17452.56 6713.25 Mins Schlumberger -Private Offset Trajectory I tSeparation Allow I Sap. I Controlling I Reference Trajectory I Risk Level Man H04-1.03(PI)(Def Plan) 1-104-1-04 (P1) Anti -Collision Summary Report Analysis Date-24hr Time: September 25, 2018- 11:26 Analysis Method: Normal Plane Ghent BlueCrest Reference Trajectory: H04-1.04 (Pi) (Dei Plan) Field: Cosmopolitan Unit Depth Interval: Every, 10.00 Measured Depth (ft) Structure: Cosmopolitan Pad Rule Set: DSM AntiCollislon Standard 5002 v5.115.2 Slot: H-04 Min Pis: All local minima indicated. WON: H04 Version / Patch: 2.10.544.0 Borehole: 1104-1.04 Database 1 Project: Iocalhos WrIlling-Cook Inlet Scan MD Range: 17710.00ft - 20050.65ft 4IQ 85 -0.01 OSF1.W Trajectory Error Model: ISCWSA03-D 95.000% Confidence 2.7955 sigma, for subjectwell. For MINPT-O,EOU 0.39 Offset Trajectories Summary Offset Selection Criteria OSF1.50 17740.00 7124.98 Wellhead distance scan: Restricted within 61061.15 it 97.50 Selection fifters: Definitive Surveys - Definitive Plans - Definitive surveys exclude definitive plans OSF1.50 18228.48 7126.56 OSF11.00 - All Non -Def Surveys when no Def -Surrey is set in a borehole - All Non -Def Plans when no Def -Plan is set in a borehole Offset Trajectory I tSeparation Allow I Sap. I Controlling I Reference Trajectory I Risk Level Man H04-1.03(PI)(Def Plan) Fail Major 0.00 281.91 -188.3'! _281.91 -0.01 OSF1.50 1]]10.00 ]12621 OSF<5.00 OSF<L50 OSF<t00 Enter Major 0.04 143.]] -96.23 14373 -0.01 OSF1.50 1]]20.00 7125.77 MinN-O-SF 0.17 1".03r--%L27j 4IQ 85 -0.01 OSF1.W 17730.00 7125.36 MINPT-O,EOU 0.39 144.29-9621143.8 -0.01 OSF1.50 17740.00 7124.98 MinPt-dAOP 97.50 14800 -1.59 -5050 0.98 OSF1.50 18228.48 7126.56 OSF11.00 ExIll Major 148.05 148.26 4878 -0.21 1.50 OSF1.50 18358.99 7127.75 OSF-1.50 Exit Minor 338.2 115,05C261.10 223.18 4. OSF1.50 19325.50 6919.78 MlnPts 1-104-1.02 (Pt) (Def Plan) Waming mart 210.40 143931 114021 66471 2.20 OSF1,50 17710.00 7128.21 OSF<5.00 Enter Alen 483.81 14888 384.13 334.93 4.90 OSF1.50 18280.87 ]12].04 TO Hansen MA (Def Survey) Warning Net 2467.43 741.1] 1972.99 1728.26 5.00 OSF1.50 18320A8 7127.40 OSF<500 Enter Alen 1]8146 742.331 1286.24 1030.121 3.80 OSF1.50 20050.65 6613.25 MiaPts Hansen #1(Def Survey)- -- -- 254].36 ]41.2] 205284 1806.09 5.16 OSF1.50 18263.41 7126.88 MinPt-CtOt Pass 2547.40 741.41 2052.]8 1805.99 5.16 OSF1.50 18281.88 ]12]05 MINPT-tTEOU 2547.51 741.54 2052.80L 1N6,96L 5.16 OSF1.50 18300.33 7127.22 MinPt-O-ADP 2548.74 742.10 2053.67 1806.674F--5 1-6 OSF1.50 18383.08 7127.97 MlaPI-O-SF 2614.95 768.5 2102.2 1=__5_1 11 OSF1.50 18942.11 7057.95 MlnPte Hansen #1AL1 (Oaf Survey) Pass 2]]3.17 696.15 2308.73 207].02 5.98 OSF1,50 1771000 ]126.21 Miaft 2968.6 718.11 2489.53 2250.51 6.21 OSF1.5D 19685.69 6775.97 MlnPt-CICI 296935 723.01 2487.40 2246.74 8.17 OSF1.50 19883.64 6692.30 MINPTOEOU 2970.46 ]23.83 248].56 22468 616 OSF1.50 19900.48 6676.73 297416 726.98 248976 224].] 6.1 OSF1.5D 20050.65 6613.25 MinPI.O-ADP MinPt-0SF H16PB1(Def Survey) 3119.51 882.0 257472962.M 18.24 OSF150 17710.00 7126.21 Pass 3121.57 25].6863.96 is. OSF1.50 17]84.83 7124.20 MinPts MioPf O.SF 3122.71 257.7865.0 18.2 OSF1.50 17794.34 7123.56 MinPt-O-SF 3135.]4 258.8876.90 18.2 OSF1.50 1812502 7125.62 MinPt-O-SF 3143.01 259.4883.5 18.2 OSF1.50 18274.84 7126.98 MinPt-OSF 3150.03 280.00 2976.37 2890.0 16.2 OSF1.50 18404.85 7126.17 Minlot-041F 313E8 265.89 2960.41 2872.18 17.78 OSF1.50 19474.52 6856.79 MinPt-CtCt 3137.90 265. 2980.3 28]211 17.77 OSF1.50 19493.31 6848.84 MINPTOEOU 3137.95 265.85 2M.4q 17.77 OSF1.50 19502.71 6844.87 MlnPt-bADP Schlumberger -Private 3143.61 26632 2965 47 2876.89 1774 OSF1.50 19663.82 6776.77 MinPt-0SF 3158.57 37T831 2906361 2780.7411 12.57 OSF1.50 19876.81 6686.73 MinPts H18(Def S."y) Pass 3119.51 257.43 294757 1 2862.09 18.24 OSFi.50 1771000 7126.21 MinPts 3121.57 257.61 2949.50 2863.96 182 OSF1.50 17764.83 7124.20 MInPt-O-SF 3122.77 257.71 2950.63 2865.06 18.2 OSF1.50 1794.34 7123.58 MInPI-O-SF 3135.74 258.84 2962.86 2876.90 18.2 OSF1.50 18125.02 7125.62 WPI-OSF 3138.73 259.08 290.68 2879.65 18.2 OSF1.50 18184.94 7126.16 MinPt-0-SF 3148.57 259.95 2974.94 2888.62 18.2 OSF1.50 18404.15 7128.16 MInPt-O-SF 3149.00 260.70 2974.87 2888.30 18.18 OSF1.50 18606.51 7119.37 MlnPt-CIOI 3149.03 280.] -2974,8511 2888.25 18.18 OSF1.50 18822.80 7117.73 MINPT-0{01J 314904 2079. 297485 2888.25 18.18 OSFL50 18828.17 7117.38 MInPI-O-ADP 3161.71 265.10 298465 2896.61 17.95 OSF1.50 19423.16 8878.50 MInPI-CICt 3161.72 MA 2984.6 2896.58 17.95 OSF1.50 19441.47 8870]8 MINPT-O-EOU 3161.74 265.17 2984.83 2898.517.95 OSF1.50 19450.58 8888.91 MmPt4 ADP 317229 269.27 299244 2903all 17.73 OSF1.50 20050.85 6613.25 Ming-0SF H18A-LD6 (P3)(Daf Plan) Pass 3200.68 299.62 3000.59 2901.04 16.07 OSF1.50 17715.25 7125.97 MinPls 3200.7 299.76 3000,611 201,021 16.06 OSF1.50 17774.10 7123.97 MinPt-O-ADP 322]94 30].08 3022.89 2920.88 15.81 OSF1.50 19505.88 8843.53 MinPIOSF 3262.31 308.77 3056.13 2953.54 1589 OSF150 20050.85 6813.25 TD H16A-L05(P3)(Def Plan) 320066 299.623000.59 2901.04 16.07 OSF1.50 1771525 7125.97 Pass MinPts 3200.]7 299.76 3000.61 2901 021 16.06 06F1.50 17774.10 7123.97 MinPI-O-ADP 3227.94 307.08 3022.89 2920.86 15.81 OSF1.50 19505.88 8843.53 MhPl-0-SF 3261.83 308.90 3055.57 2952.93 15.89 OSF1.50 20050.65 661325 TO H1M-L07(P3)(Def Plan) 3200.86 299.82 3000.59 2901.04 16.07 OSF1.50 1]]1525 7125.97 Pass Minfis 3200.7 29936 3000.61 290102 16.06 OSF1.50 1774.10 7123.97 MInPt-O-ADP 322794 307.08 3022.89 2920.86 15,81 OSF1.50 1950588 6843.53 MInPt-0SF 3262.31 308.77 3056.13 2953.54 15,89 OSF1.50 2005065 6613.25 TD H16A (P3) (Def Mon) 3200.66 299.82 300059 2901.04 16.07 OSF1.50 17715.25 712597 Pass MlnPts 3200.77 299.76 3000.61 2901.02 16.06 OSF1.50 17774.10 712397 MinPI-O-ADP 3227.94 307.08 3022.89 2920.86 15.81 OSF1.50 19505.88 6843.53 Min%-OSF 3262.31 308.77 3056.13 2953.54 15.89 OSF1.50 20050.65 6613.25 TD HiBA-L04(P3)(Def Plan) - -_-- - 320066 299.623000.59 2901.04 16.07 OSF1.50 17]15.25 712597 Pass MinPts 3200.77 299.76 3000.612901.02 1606 OSF1.50 17774.10 7123.97 MInPt-O-ADP 3238.05 31025 330.88 292T80f 15,701 OSF1.50 20050.85 6613.25 MInPl-O-SF Hi6A-L03(P3)(Dot Plan) 3200.88 299.62 3000.59 290194 18.07 OSF1.50 17715.25 ]1259] Pas. MlnPts 320017 299.76 3000 .612901.02 16.06 OSF1.50 17774.10 712397 MInPt-O-ADP 3219.94 308.88 3013.69 2911.06 15.68 OSFl.50 19811.11 6714.51 MinPt-O-SF H16A.LO2(P3) (DefPlan) Pass 3200.88 299.82 3000.60 2901.08 16.07 OSF1.50 17710.00 7128.21 MlnPls 3214.4] 302.17 3012.70 2912.31 16.WJ OSF1.50 18405.85 7128.18 MinPt-O-SF 3231.57 302.68 302945 2928.89 16.06 OSF1.50 18989.21 704473 TO H16A-LO1 (P3)(Def Plan) Pass 3210.59 299.50 3010.55 2911.02 16.12 OSF1.50 1]]10.00 712621 Minma 3211.26 299.65 3011.16 2911.61 16,121 OSF150 1733.02 7125.24 MInPt-O-SF 3218.22 300.01 3017.88 291820 16.14 OSF1.50 17872.06 7123.31 TO 4112-L3 (Def Surrey) Pass 4050.2 273.09 3867.84 377.14 22.32 OSF1.50 17942.13 7123.95 MinPt-CtCI Schlumberger -Private Schlumberger-PrWate 4050.24 273.12 3867.83 3777.12 22.32 0SF1.50 17952.12 7124.04 MINPT-0-EOU 405026 273.14 3867. 3777.1 22.32 0SF1.50 17962.12 7124.13 MmPl-0-ADP 4049] 273.57 M67 05 3]]6.19 22.28 OSF1.50 18142.09 7125.77 MIaP1-CICt 4049.77 273.5 36610 3]]6.1 22.28 OSF1.50 18152.09 7125.86 MMpts 40a6.69 27482 366315 37]1.8] 22.18 OSF1.50 18598.29 7120.15 Min%-C1CI 404669 274.8 3863.14 3]]1.86 22.16 OSF1.50 18601.02 7119.89 Mlnft 4040.51 2]8.02 385617 3764.49 22.03 OSF1.50 18960.56 7052.90 MinR-CICt 404052 Mod 3856. t5 3764.45 22.03 0SF1.50 18970.29 ]050.1] MINPT-0-E0U 4040.55 278.10 3856.16 3]64.45 22.02 0SF1.50 18980.00 ]04].40 MInRt DP 4028.45 278.4 3842.76 3750.41 21.80 0SF1.SD 19420.30 6879.71 MinPt-CtC1 4D28.46 2]8.9 3842.]5 3]50.38 21.80 0SF1.50 19430.28 68]5.49 MINPT-0-E0U 4028.50 2]8.13 3842.75 3750.3] 21.80 OSFi.50 19439.45 6871.61 MmPt-O-ADP 4033.42 27990 38464 3753.52 21.69 OSF1.50 19820.07 8710.72 MINPT-O{OU 4033.50 280.00 3846.51 3753. 2168 OSF1.50 19840.011 6]02.2) MinPt-6ADP 4036.71 28106 3849.00 3755.64 2161 OSF1.50 20050.65 6613.25 MlnP60-SF H12-L02(Dei Survey) 4050.2 273.08 3867.84 3]7].14 2232 0SF1.50 17942.13 7123.95 Pass MinP1LYq 4050.24 2]3.12 3861.83 3777.12 22.32 0SF1.50 17952.12 7124.04 MINPT EOU 405026 273.14 386].84 377].11 22.32 0SF1.50 17952.12 7124.13 Min% -0 -ADP 4049.40 273.69 386661 37]5]1 22.27 OSF1.50 18182.02 7126.14 MisPI-CtCt 4049.40 273.7 38885 377568 22.27 OSF1.50 18191.98 7126.23 MINPT-O-EOU 404942 2]3.]5 38865 3175.6 22.26 OSF1.50 18201.97 7126.32 MInPt-0-ADP 4050.9 274.32 3867.76 3116.65 22.23 OSF1.50 18380.97 ]12].95 MsPt-QCt 4050.98 274.3 3887J5 377663 2222 OSF1.50 18390.90 7128.04 Minft 4059.39 275.39 3875.47 3764.00 22.1 0SF1.50 18760.17 7098.44 MInRt F 4037.52 321.09 3823.13 3716.42 18.91 0SF1.50 198]3.86 6687.98 MhPls H12{" (DdSurvey) --- _---- - - 4050.2 27309 386]84 3711.14 22.32 OSF1.50 1]942.13 Pass 7123.95 MinPt-OtC1 4050.24 273.1 38678 3]]712 22.32 OSF1.50 17952.12 7124.04 MINPT-O-EOU 4050.28 273.14 386].8 3]]7.42 22.32 OSF1.50 1]962.12 7124.13 MinPt-O-ADP 4049.]6 273.57 385705 3176.19 22.28 OSF1.50 18142.09 7125.77 MhPt-CICt 4049.]] 273.5 3861.04 3]]6.1] 22.28 OSF1.50 18152.09 7125.86 Wft 4098.6 274.82 3863.15 377187 22.16 0SF1.50 18596.29 7120.15 MMPI -0C% 4046.69 274.8 3863.14 3111.8 22.16 0SF1.50 18801.02 7119.89 MNPta 4039.7 276.30 3855.20 376343 22.00 0SF1.50 19035.36 ]030.]0 MInMI VQ 4039.74 276. 3855,19 3] 8340 22.00 0SF1.50 19044.63 702].75 MINPT4 EOU 4039.]] 276.37 385519 3]63.31 22.D0 OSF1.50 180.53.88 ]024.]8 MmPl-0ADP 4039.88 277.05 385466 376264 21.94 OSF1.50 19205.74 6989.80 MinP1-CICI 9039.71 2]].13 3854.63 3762.58 21.94 OSF1.50 19223.03 6962.54 MINPT-O{OU 4039.74 277.17 3854.63 3]62.57 21.93 OSF1.50 19231.53 8959.32 MlnPt-0-ADP 4047.38 278.47 3861A1 3768.91 21.87 OSF1.50 19558.82 6822.00 4081.83 280.52 3894.48 3801.30 21.90j CSF150 20050.65 8613.25 MinP1-USF MInPt-O F H12 (Del Survey) Pass 9050.2 273.09 3867.84 3777.14 22.32 OSF1,50 17942.13 7123.95 Min%-C1C1 4050.24 273.1111 386].8 37]].13 22.32 0SF1.50 17952.12 7124.04 4050.26 273.14 386]8 37]].13 22.32 OSF1.50 17962.12 7124.13 MINPT-0-EOU MMPI -0 -ADP 4W8) 273.57 386705 377619 22.26 OSF1.50 18142.0 7125.77 MinPi-Mt 4049.]] 4735 388].0 3776.1 22.28 OSF1.50 18152.09 7125.88 MinPls 4046.89 274.82 386315 3771.81 22.16 OSF1.50 1559828 7120.15 WR -Mt 4048.892748 3863.15 3]71.88 22.16 OSF1.50 18601.02 7119.89 MinPts 4039.]3 27630 385520 3763.43 22.0 OSF1.50 19035.36 ]030.]0 MmPl- t 4039.74 2]6.3 3855.19 3763.40 22.00 OSF1.50 19044.63 7027.75 MINPT-O-EOU 4039]] 276.37 38551 EW 3M 22.00 0SF1.50 19053.86 ]024]8 MmRP DP 4039.89 2]].04 3864.66 3762.64 21.94 0SF1.50 19205]4 8969.80 MinPt-CtU 4039.71 2]].13 38$4.63 3182.58 21.94 0SF1.50 19223.03 6982.84 MINPT-O-EOU 4039.74 2]].17 3854.64 3762.571_21." OSF1.50 19231.63 6959.32 Min% -O -ADP 4047.38 278.48 3861.41 3]68.92 21.8] OSF1.50 19556.82 8822.00 MInPt-O-SF 4068.30 28(1.11 3861.23 3788.19 21MI OSF1.50 20037.4 6819.00 MinP1-0-SF 4068.97 280.16 3881.87 3788.81 21.88 0SF1.50 20050.65 6613.25 TD Schlumberger-PrWate 912-L05 (Def $UNay) Paas 4050.2 273.09 386785 3777.15 22.32 OSF150 17942.13 7123.95 MInPt-CIC( 4050.24 2]3.11 386]8 3777.13 22.32 OSF1.50 1795212 7124.04 MINPT-O-EOU 405026 273.13 3867.85 3777.1 22.32 OSF1.50 17962.12 7124.13 -- 273.56 3867.05 3776.19 22.28 OSF1.50 18142.09 ]125.]7 MInPt-O-ADP MlnPt-QCt Q49]]2]3.5 3807.0 37]8.1 22.28 OSFI.W 18152.09 7125.86 4046. 27482 3863.15 377187 22.16 OSF1.50 18598.29 7120.15 Min% Minn-C10 4046.69 2748 3863.15 3]71.87 22.16 OSF1.50 18601.02 7119.89 40397 276.29 3855.20 3763.43 22.00 OSF1.50 19035.36 ]030.]0 Minns Minn-QCt 4039.74 276.3 3855.1 3763.41 22.00 OSF1.50 19049.63 ]027.75 MINPT-O-EOU 4039.]] 278.37 MO 370.4 22.00 OSFI.W 19053.86 ]024.]8 4039.68 2]].04 3854.67 3762.65 21.95 OSFI.W 19205.74 69119.80 Minn-O-ADP Minm-CiO 4039.71 277.123854.63 3762.59 21.94 OSF1.50 19223.03 6862.84 4039.74 271.16 304.641 3762.58 2194 OSF1.50 19231.83 MINPT-O{OU 8959.32 MlnPI-O-ADP 4047.38 278A6 3861.41 3]66.92 2187 OSF150 19556.82 682200 MMRF 4068.30 280.11 3881.23 3788.19 21.86 OSF1.50 20037.04 8819.00 4088.97 280.15 3881.8] 378882 21 86 OSF1.50 20050.85 6613.25 Mine[OSF TD 1112L08 (Def Survey) Pass 4050.23 21309 386]84 377].14 22.32 OSF1.50 1]942.13 7123.95 4050.24 27311FF-78-7-7-8411 3]]7.13 22.32 OSF1.50 17952.12 7124.04 Minn-mt 4050.26 273.14 386784 3]7713 22.32 OSF1.50 17982.12 7124.13 MINPT-O-EOU 4049.] 273.57 386705 3776.19 22.28 OSFLW 18142.09 7125.71 MinPtOADP 4049.77 2]3. 386].05 37761 22.28 OSF1.60 18152.09 7125.86 Minn-QCI Min% 4048. 274.82 386315 3771 87 22.16 OSF1.50 1808.29 7120.15 Minn-CIO 4046.0 274.3863.15 3711.8 22.16 OSF1.W 18601.02 7119.89 4039.7 276.30 3855.20 3763.43 22.00 OSF1.50 19035.36 ]030.]0 Min% 4039.74 2]6.3 3855.19 3763.40 22.00 OSF1.50 19044.0 7027.75 Minn-C(Ct MINPT-O-EOU 4039]] 276.37 3855.19 3]83.3 22.00 OSF1.50 19053.86 ]024.78 409.68 2]].04 3854.66 3762.64 21.94 OSF1.50 19205.74 690.80 MmRn DP MlnPI-CtCt 409.71 27].133854.63 3762.58 21.94 OSFI.W 19223.03 6962.84 4039.74 277.17 3854.(Aj 3762.57 21.94 OSF1.W 19231.63 6959.32 MINPTOEOU 4047.38 278A6 3881.41 3]68.92 21.8 OSF1.50 19556.82 Minn-O-ADP 022.0 Minn-O-SF 400.30 2W41 301.23 3788.19 21.88 OSF150 2037.04 019.00 40669] 280.16 3881.87 3786.81 21.86 OSF1.50 200085 6613.25 Miinn-O-SF TO H12-101 (DefSurvey) 406651 2]2.82 3884.30 3793.8 2243 OSF1.50 1]711.43 7126.15 PBea Minns 4067.94 272.92 3885.66 3795.02 22,431 OSF1.50 17749.20 7124.67 4049.90 274.89 3886.44 37]5.2122.19 OSF1.W 18626.% 7117.29 MinPt-O-SF 4049.161 317.39 3837.241 3731 771 19.19 OSF1.50 18764.72 7091.% MhPt-O-SF Minn. H14PB2 (Def Survey) Pass 4559]0 258.12 4387.26 4301.59 26.60 OSF1.50 18140.07 7125.75 MmPtCtCt 4559.72 258.1 438723 L 430153 26.0 OSFI.W 18160.05 7125.94 4559]6 20.23 438]25 4301.5 26.59 OSF1.60 18170.05 7126.03 MINPT-O-EOU 4565.10 2600 4391.35 430802 26.43 OSF1.50 1862].2] 7117.28 Minn-O-ADP 4579.99 37846 4327.311 4201.511 1820 OSF1.50 19190.54 6975.81 Minns MinPts H14PB1 (Def Survey) 4713.61 257.1 4542.0 4456.6 27.60 OSF1.60 17713.66 ]126.05 Pass 48]7.51 261.97 4502.54 4415.55 26.88 OSFI.W 18681.04 70]3,42 Minns 4876.99 263.52 4%0.98 4413.47 26.72 OSFI.W 19151.70 6990.65 MinP1-C1C1 Minn-CtCt 4677.0 263.]9 400.90 4413.30 280 OSFI.W 19194.93 6974.09 MINPT-O-EOU 46]].18 20.90 4%0.92 4413.28 26.0 OSF1.50 19212.00 6967.30 Minn-O-ADP 4]08]8 268.50 4529.48 U40.281 2640 OSF150 20050.65 6613.25 MinPFO-SF 1414 133 (Def Survey) 256.9 4599. 4514.31 2796 OSFI.W 17710.00 ]126.21 Pass M47112 4]]0.56 258.66 459].]9 451190 27.76 OSFI.W 18195.92 Min% 7126.26 Minn-CICI 4770.64 25891 4597.70 4511.73 27.74 OSF1.50 1054.72 7126.80 MINPT-O-EOU 4]70.]5 259.04 4597.72= 27.73 OSF1.50 18284.84 ]127.0] On658 260.79 001.37 4814.7/ 27.57 OSF1.50 18884.88 7110.23 Minn-0-ADP Minn-CtCt Sahlumbeger-Privale 4]]559 26088FF 460134 4514.71 27.58 0SF1.50 18705.36 ]10].31 MINPT-O-EOU 4]]564 260.93 4601.36 4514.]1 27.55 0SF150 18715.60 7105.n MInRt 4]]96 287.40 460104 451223 26.90 0SF1.5D 19854.89 6698.00 -ADP MinPt C( 4]]9.66 267.46 460103 4512.21 26.90 0SFI,W 19863.95 6692.1] MsRs 4]8].64 266.58 4608.26 4111111 AM 0SF1.50 20050.65 6613.25 MIOPI -0 -SF H14(Def SUmy) Pass 4881.48 258.55 4708.7 4622.9 2842 OSF1.50 1771674 7125.91 MinPts 488536 258.97 4712.39 4626.40 28.4 0SF1.50 17855.33 7123.19 MInFt-O-SF 0888.75 260.33 4]158] 462942 28.28 0SF1.50 18236.10 7126.65 MInPt-CtC 4889.]] 260. 4]15.8 41329011 28.27 0SF1.50 18248.07 ]126.]4 Mlnpp 4882.20 26464 4705.44 4617.56 27.77 0SF1.50 191]],0 8980.91 MIOPI-CICt 4882.21 264694]05.42 4617.62 27.76 0SF1.50 19188.68 877.32 MINPT-O-EOU 4882.26 26415 4]05.43 4a17 511 27.76 0SF1.50 19195.94 6973.89 MsPI-0-ADP 4911.74 269. 4731.fi5E 4642.10 27,2 0SFIM 2002517 8623.60 MINPT-O-EM 4911.83 269.]5 4]31.6] 4842.0 2].41 0SF1.50 20044.44 6615.88 MlnPt-OADP 4911.87 269.79 4731.89 4642,081 27.40 0SF1.50 20050.65 681325 MinM-O-SF Survey) Pass ]91]55 113.941 7041.16 7803.61 105,401 0SF1.50 19255.23 6949.48 MinPts ]91].55 11393 7841.17 7803.63 105,2 0SF1.50 19257.29 694861 MinPt-CtCt 854279 109.35 846946 6433.44 118.56 0SF1.50 19600.35 6803.59 TO H04-LOt(Pt)(Oef Plan) Pass Survey) Pass 4888.08 261.17 4513.64 4426.91 27.02 0SF1.50 18723.22 683801 MmPt-CIU 4688.10 261.21 4513.64 4426.90 27.02 0SF1.50 18732.35 6832,16 MinPts 4706.53 263.38 453062 4443.15 2890 0SF1.50 19250.37 6613.25 MInlst 3 SF H14P63 (Oet Survey) Paan 4754.30 25410 4584.56 4500.19 28.17 0SF1.50 16909 75 7126.26 MinPts 4]57]4 254.76 458].5] 4602AII 28.1 0SF1.50 16999.79 712428 MIOPI -O -SF 4]]0.22 256,70 4598.76 4513.5' 219 0SF1.50 17130580 7128.19 Minlst-OSF 4]]085 258.51 4598.18 4512.34 27.78 0SF1.50 161]].61 7047.94 Min%-CICt 4770.89 258.59 4596.1 451230 27.77 0SF1.50 18196.65 704238 MINPT-O{OU 4770.95 258.67 4598.18 4512. 27.77 0SF1.50 16215.59 7036.68 MlnRt MP 4818.45 263.39 4840,53 4553.061 2].53 0SF150 19250.37 8613.25 MmPt-O-SF H14(Daf Survey) 4858.61 255.79 4687.96 460302 28.60 0SF1,50 16904,78 Pass 7126A5 MinPts 4860.79 256.91 4689.11L_4003,8 2848 0SF1.50 17071.18 7124.62 MInPt-O-ADP 4664.14 25].3] 4892.24 4fi06] 28.45 0SF1.50 1]209.23 7125.55 4878.74 25833 4706.20 46204 28.43 0SF1.50 1]608.]4 7128.21 MmR-OSF 4889. 260.18 4716.13 4829.73 28.29 0SF1.50 18222.80 7034.62 MlnPt-O-SF Minm-C 488991 280.2 4]18.1 4829.)1 28.29 0SF1.50 18232.10 7031.56 48925 261.67 4717]8 4830.89 28.15 0SF1.50 18554.06 6903.27 Min%s MmRP Cl 4692.58 M.7 4717.76 463084 28.14 0SF1.50 18582.87 680.32 MINPT-O-EOU 4692.62 281.79 4717.77 483083 28.13 0SF1.50 18592.28 6891.34 MinR-OADP 4894]1 263.41 4718.]] 4631.29 27.97 0SF1.50 18958.42 6736.62 MinPI-CICt 4894,74 263.50 4718] 463124 27.96 0SF1.50 1877.08 8]28.]3 MINPT-0-EOU 4684.]] 263.54 4718]5 4831.23 L 27.96 0SF1.50 18986,2 6724.79 MinM-O-ADP 490341 264.74 4]26.59 4638.67 2].68 0SF1.50 19250.37 6613.25 MinPt-O-SF Su"Y) Pass 6421.96 IU.961 6M2.Wl 6289.02 73.06 0SF1.50 18452.95 6950.22 MinPts 8421.98 132.91 6332.98 6289.07 ]3.09 0SF1.50 18458.17 8948,02 MinPt-CICt 7763.27 115.54 7685.82 764714 101.91 0SF1.50 19250.37 6613.25 TO Survey) Pass 4]48.69 252.25 4561.20 4497.44 28.35 0SF1.50 16795.86 7128.14 MinPt-CI 4]49.]6 252,6 4561.13 4497.30 28.33 0SF1.50 16802.81 7128.19 MINPT-O{OU $ hlumberger-PrWate H14 (Def Survey) H14 (Def Survey) 4749.85 252.56 4581.15 4497.29 28.31 OSF1.50 18805.98 7128.21 16150.00 4]63.3] 259.6 4589.9 4503.71 27.62 OSF1.50 1]25].24 7078.79 Min%43J1DP 4]63.]3 280.13 4589.98 450360 27.57 OSF1.50 1]283.8] ]0]2.59 MINPT-o-EOU 4769.53 265.12 45924 4504.41 27.08 OSF1.50 17539.28 6995.02 Min% -O -ADP 4]82.55 275.5 45985 4507.05 28.13 OSF1.0 1802].33 8]91.96 Min%O-ADP 4783.08 276.14 4598.84506. 28.07 OSF1.50 18055.11 6780.22 MINT EOU 4798.97 284.01 4809.30 4514.01 25.43 OSF1.50 183]9.1] 6643.25 MinM-0-ADP 7128.16 MinPt.O-SF OSF1.50 18617.92 6643.25 Min% MAS =I0.O Im) MsPt-O-SF 94].99 Minn. MAS =10.00 (m) Pass 9832.1 252.47 4863.50 45]9.6 28.82 OSF1.50 16120.71 7125.69 2390.00 483814 250 9 4870.52 4587.20 29.03 OSF1.50 18452.12 7123.36 MinPis 4838.1 250.91 4670.54 4587.23 29.03 OSF150 18458.80 7123.45 MinPls 4881.13 25 9. 468].8] 4601 ]3 28.21 OSF1.50 1]146.34 7100.71 MinNLtct 4861.38 259.]0 468]90 480166 28.18 OSF1.50 17164.72 709251 MINPT-O-EOU 4902.50 278.81 471630 46236 26.48 OSF1.50 18109.65 6]57.1] MInPI-O-ADP 491319 285.40 4]22.60 4627.79 25.91 OSF1.50 183]9.1] 8843.25 MinP1-0-ADP 13080.00 6320.7 Min% -O -SF OSFi.O 1470.0 6696.37 Min% -O -SF Mm% -O -SF 14710.0 034.30 MInP(-0SF OSF1.50 1500.00 7033.03 MinR-O-SF Pass 4781.96 255.97 4610. 4525.9 28.13 OSF1.50 18650.00 6]98.]6 OSF1.50 4782.49 256.51 4811.16 45259 28.07 OSFi.O 18090.00 6781.85 MInPLs 4791.45 258.38 4620.20 4535.07 28.14 OSF1.0 18417.92 8843.25 Mini to TD 4790.36 4836.93 4859.45 4860.69 4860.91 48]0.27 4887,08 4695.58 4903.77 4909.01 ]031.16 5570.02 192.81 192.84 213.82 34].75 352.41 8]1.06 1225.17 18724 2642.44 2]20.08 2845.58 29]9.1] 3125.56 35]2.94 3652.30 3915.85 4258.11 44]4.02 4569.30 4688.38 4790.36 4837.41 48]4.16 476.58 180,51��690].64 685065 61.6 198.4][ 5435.421 5371.54 43.55 32.81 187.20r 159.80 46.37 32.81 203.62 32.81 330.80 32.81 335.26 57.20 832.49 ]3.38 1175.87 119.32 187.32 124.48 2559.07 128.05 2634.73 134.0 2755.26 142.14 2884.03 149.51 3025.51 1]6.1] 3455.11 180.21 3531)8 194.22 3768.00 216.27 4113.55 228.65 4321.22 233.42 4413.31 244.32 4525.17 247.U4 25.34 251.]711 4868.231 28.96 Fess OSF1.50 16150.00 7126.16 MinPN OSF1.0 1644000 7124.16 MInP OSF1.0 17020.00 7121.58 Mfti 6 OSFi.0 17100.00 7113.23 MINPT-O{OU OSF1.50 1715D.00 7106.33 Min%s OSF1.50 17540.00 7008.62 Mine OSF1.50 17920.00 8853.70 MMM-0SF OSF1.0 18080.00 6781.85 Minft OSF1.50 18260.OD 6710.00 Mine OS%.50 16417.92 6643.25 TD .Pais OSF1 50 16150.00 7128.16 MinPt.O-SF OSF1.50 18617.92 6643.25 Min% MAS =I0.O Im) 95050 94].99 Minn. MAS =10.00 (m) 1020.00 1016.79 MIN"-O-EOU MAS =10.00 (m) 1500.00 1473.74 MinPt-"F MAS =10.00 (m) 2390.00 2201.56 Min%-0SF MA-10.00(in) 2410.00 2215.45 Min% -O -SF OSF1.50 4070.00 2978.63 Min% -O -SF OSF1.50 5120.00 3368.99 MsP1-0SF OSF1.50 7050.00 4088.52 MmR% F OSF1.50 9310.00 4928.72 Min%-0SF OSF1.0 9540.00 5012.23 MinPt-OSF OSF1.0 9910.00 510.79 Min% -O -SF OSF1.50 1031050 5298.0 MInPt-O-SF OSF1.50 1740.0 5458.36 Min% -O -SF OSF1.50 1200.00 5949.10 MMRF OSF1.0 1230.00 6038.33 Min%-0SF OSF1.0 13080.00 6320.7 Min% -O -SF OSFi.O 1470.0 6696.37 Min% -O -SF OSF1.50 14710.0 034.30 MInP(-0SF OSF1.50 1500.00 7033.03 MinR-O-SF OSF1.50 1540.00 7121.9 MmPt4 F OSF1.50 16150.00 7128.16 MinR-0SF OSF1.50 18440.OD 7090.96 Mmn OSF1.50 17060.00 6880.18 Mins OSF1.50 1718D.00 6829.15 Min%-OADP Schlumberger -Private 4876.67 253.62 4707.27 4623.06 28.95 OSF1.50 17190.00 6820.90 Minh -0 -SF 4883.32 252.76 471449 4630.56 29.09 OSP 50 17452,56 671325 TD H14PB2(Oef Survey) Pass 19809 32.81 196.81 16529 N/A MAS =1000 (m) 000 0.00 Surtace 196.0 32.81 196.81 165.2 N/A MAS =1000 (m) 3000 30.00 MinPis 198.09 32.81 196.81 155.29 152204.12 MAS =10.00 (m) 35.25 35.25 198.32 32.81196.6 185.51 529.79 MAS =10.00 (mJ 120.00 120.00 WRP 192.61 32.81 18].20 159.80 46.37 MAS =10.W (m) 950.00 947.99 MIND]-O-EOU MmRs 192.84 32.81 186.98 160.03 41.91 MAS =10.0(.) 1020.W 1016.79 MINPT-O{OU 213.82 32.81 203.62 181.02 2384 MAS=10.0(.) 15N.0 1473.74 MhPt-O.SF 347.75 32.81 330.80 314. 22.12 MAS=10.00(.) 23W.W 2201.58 WnPIOSF 352.41 32.81 335.26 31950 2212 MAS =10.00(.) 2410.00 2215.45 MmRN F 871.06 57.21 832.49 813.85 23.3 OSF1.50 4070.00 2978.0 WN -"F 1225.17 73.39 1175.87 1151.] 25.41 OSF1.50 5120.00 3388.99 MinPt-OSF 1887.24 119.33 1807.31 1767.91 23.94 OSF1.W 7050.0D 4W6.52 MinPt-OSF 2642.44 12449 2559.06 2517.94 32.1 OSN.W 9310.W 492612 MmPt.0.SF 2]20.48 128.07 2834.72 2592.41 32.1 OSF1.50 040.0 5012.23 MW( -O -SF 2845.58 134.93 2755.25 2710.65 31.8 OSF1.50 9910.00 5149.79 MinR-O-SF 2979.17 142.18 2884.01 2837.00 318 OSF1.50 10310.00 52N.W MInPt-O-SF 3125.56 149.53 3025.49 2976.0 31.5 DSF1.W 10740.0 5458.38 MmPIO F 3572.94 176.19 3455.10 3396.] 30.6 OSF1.50 1200.00 5949.10 MinPtOSF 3652.30 180.23 3531.7] 3472.0 305 OSF1.W 1230.00 6038.33 MMR-OSF 3915.85 194.24 3785.98 3721.61 30.41 OSF1.W 13080.00 6320.87 Mine-OSF 4258.11 216.30 4113.53 4041.81 29. OSF1.W 14070.W 6898.37 Mine-OSF 44]4.02 228.88 4321.20 4245.35 29.49 OSF1.0 14710.W 6934.30 MinR-O-SF 0.569.30 233.45 441329 4335.85 29.50 OSF1.50 1500.0 7033.03 Mi PIOSF 4602.70 2565 4431. 4346.20 27.0 OSF1.50 1630.00 7113.36 MinNs 4588.82 251.82 4420. 433]00 2].45 O IC50 1683000 8976.58 MInPtOADP 458879 251.7 442D.5 433] 01 27,46 OSF1.50 16640.00 8972.86 MINPTOEOU 4588.]5 251.67 4420.81 433].08 27.0 OSF1.W 16870.00 690.65 MInPI-M 459722 253.12 4428.11 4344.10 2735 OSF1.0 17220.00 6812.14 4594.39 25346 4425.05 434092 27.30 OSF1.W 17430.0 6722.84 MinM-OSF 4594.11 25341 4424.81 4340.70 27.30 OSF1.50 17452.% 671315 MinP1-O-SF MmR. H14PB3(Def Survey) 19809 32.81 196.81 165.29 WA MAS 10.00 (m) 0.00 0.00 Pass Surtece FF-198-OR1 32.81 1N.81= WA MAS=10.00(m) MOD 30.00 Nn% 198.09 32.81 198.81 165.29 152204.12 MAS=10.W(m) 35.25 35.25 198.32 32.81196.6 165.51 529.]9 MAS=10.N(m) 120.W 120.00 WRP 3281187.20 159.0 46.37 MAS =10.W 950.0 MINPT-O{OU _.LO2.61J (m) 947.99 WNS 192.84 32.81 188.98 180.03 41.91 MAS =10.00 (m) 1020.00 1010.]9 MINPT-O.EOU 213.82 32.81 203.82 181.02 23. MAS =10.00 (m) 150.00 1473.74 MInPIOSF 34].75 32.81 330.0 314.94 22.1 MAS =1000(m) 230.00 2201.56 MMPtOSF 352.41 32.81 335.25 319.(10 22.12 MAS =10.00(m) 2410.00 2215.45 WnNOSF 871.W 57.21 832.0 813.85 23.33 OSF1.W 4070.W 2978.63 MmM-OSF 1225.17 73.39 1175.87 1151,78 25.41 OSF1.W 5120.0 3388.99 1887.24 119.33 1N7.31 1767.91 23.9 OSF1.50 7050.0 4086.52 Min -O-SF 2642.44 124.49 2559.06 2517.N 32.1 OSF1.50 9310.W 4926.72 MinIsW-SF 2720.48 128.07 2834.72 2592.Q 32.1 OSF1.50 954000 5012.23 Mine -O -SF 280.5.58 134.94 2755.25 2710.65 31.8 OSF1.50 010.00 5149.79 MInPIOSF 2979.17 142.16 2884.01 283TOO 316 OSF1.50 10310.00 MinRO-SF 5298.50 WR4N SF 3125.56 149.53 3025.49 2976.02 315 OSFt50 10740.00 5458.36 MInNOSF 35]2.94 176.20 3455.09 33N.7 308 OSF1.W 12060.0 5949.10 Minh-OSF 3652.30 180.24 3531]] Un 07 30.5 OSF1.50 12300.00 6038.33 3915.85 194.24 3785.98 3721.61 30.41 OSF1.W 13060.0 WR-OSF 6320.87 Minh-OSF 4258.11 216.30 4113.53 4041.81 2968 OSF1.W 14070.0 6696.37 MinPt-0.SF 4474.02 228.68 4321.19 4245.34 29.48 OSF1.50 14710.0 6934.30 WNOSF 4569.30 233.45 4413.29 433585 29.4 OSF1.50 15000.00 7033.03 4898.46 247.18 4533.31 4451.28 286 OSF1.50 1550.00 7125.57 WRn SF 4724.39 247.39 4559.13 44]]00 287 OSF1.50 1670.00 7128.26 MinMs 4729.62 248.45 4563.65 448116 28.6 OSF1.W 15830.00 7128.25 MmRN F 4745.88 261.99 457].5 4493.8 2836 OSF1.W 1800.00 7128.25 Minh-OSF Minft Schlumbeger-PNvate 4755.04 253.17 0.585.93 4501.87=28 0SF1.50 16300.00 7113.36 4761.93 252.18 4593A8 45097 280 0SF1.W 18470.00 7084.85 Min%-O-SF 4761.34 251.87 4593.0 4509.4fi 28.46 OSF1.W 18570.00 MInPI-0-SF 7081.23 Min%-0-ADP 4761.31 251. 4593.0 4509.4] 28.46 OSF1.50 16580.00 7056.69 4761.2 251.70 4593.13 4509.56 28A8 OSF1.50 18820.00 ]04].53 MINPT-O-EOU MinM-CICt 478138 251.7 4813.23 4528.8 288 0SF1.50 17320.00 6769.62 Min% 4784.69 251.65 4616.59 4533.04 28.63 0SF150 17452.56 6713.25 TD H16A-LO](P3)(Daf Plan) 238.13 32.81 238.84 20532 NIA MAS =10.00 (m) 0.00 0.00 Peas 238.13 32.81 236.84 205.32 144748.39 MAS =10.00(m) 35.25 35.25 Surface 237.31 32.81 234.95 204.50 219.92 MAS =10.00 WRP (m) 220.00 220.00 Min%s 237.35 32.81 234.88 204.54 188.69 MAS =10.00 (m) 24000 24060 MINP7-0-EOU 265.11 32.81 258.90 232.31 53.54 MAS: 10.00 (m) 980.00 957.84 WnPW 265.14 32.81 258.88 232.34 52.99 MAS=10.00 (m) 9]0.00 967.69 MINPTOEOU 304.50 32.81 294.10 V1,69 33, MAS=10.00(m) 1500.00 14]3.74 MinPt-OSF 763.28 61.95 721.59 M132 18.80 OSF1.50 4320.0 371.57 MinPI-O-SF 827.83 88.69 ]62.99 76114 18.9 OSF1.50 4850.0 3194.28 MinPt-O-SF 135811 122.46 1VIS 1238.25 16.7 OSF1.50 ]050.00 4086.52 1496.97 102.59 1428.21 1394. 22.1 OSF1.W 7720.00 4335.60 MInPt-O-SF MmRP F 1582.7 106.99 1490.7 1465.622.1 0SF1.50 8040.00 4454.57 177.30 17.97 1504.94 1469.3 22.1 0SF1.W 8110.00 4480.80 MmPtO F 1600.31 109.76 1528.77 14W.56 22.08 OSF1.0 8220.00 4521.49 MinPt-OSF 2878.89 235.00 2721.85 2643,89 OSF1.W 14520.0 6883.66 MlnPI-OSF 2911.35 237.50 275264 2673851 OSF1.50 14880.00 6923.15 MinPI-0-SF 3025.87 242.45 2863.91 2]83.4216] 0SF1.50 15200.00 ]081.]4 MInPIOSF 308].19 289.8 2893. 2]9].36 16.03 0SF1.50 1553000 7124.51 MmRP F 3102.30 290.98 297.9 2811 .32 16.04 0SF1.50 15660.27 7128.25 Min% 3162.49 297.48 2963.88 286504 16.00 0SF1.W 16300.00 MmR-OSF 7113.36 MmP1-OSF 3206.91 30509 3003.19 2901.82 15.81 OSF1.W 17050.00 6884.43 Min%-O-SF 3210.80 292.36 3015.66 2918,M 16.52 OSFi.W 17120.0 6854.66 3217.10 294.]1 3020.3 2922.3 1642 OSF1.50 17230.00 687.89 MinPt-0.SF MinPls 3221.79 284.46 3025.15 2927.33 16.46 OSF1.50 17452.56 6713.25 TD H16 (Df Survey) 238.13 3281 236.84 205.32 N/A MAS =10.00 (m) 0.00 0.00 236.13 32.81 23584 205.32 144746.39 MAS =10.00 (m) 35.25 35.25 SuHam 237.31 32.81 234.95 204.50 219.92 MAS =10.00 (m) 220.00 220.00 WRP 237.35 32.81 234.88 204.541N,69 MAS =10.00 (m) 240.W 240.00 MinNs MINPT-O-EOU 265.11 32.81 258. 232.31 7.54 MAS =10.W(m) 9W.00 957.84 Minft 26514 32.81L__L58,88JI 232.34 52.99 MAS =10.00(m) 970.00 967.89 304.50 32.81 294.10 271 89 33. MAS =10.W(m) 100.00 14]3.]4 MINPTOEOU 763.26 62.W 721.56 701.27 18.7 0SF1.W 4320.00 371.57 MlnPI-OSF MmR-O-SF 82].83 88.]3 782.96 761.0 18.90 OSF1.50 4650.7 3190.26 MinPt-0.SF 13W.71 122.52 1276.65 1236.19 16.]8 OSF1.50 ]OW.W 4086.52 1498.97 102.68 1428.14 13N.N 22.0 OSF1.50 7720.00 4335.W MhPIOSF 1562.67 107.09 1490.7 1455.58 22.1 1 05F1.5D 8040.00 4454.57 MMRSF 17].30 108.08 1504.87 1469,22 22.11 0SF1.W 8110.00 44W.60 Minh-OSF 1WO.31 109.87 1528.89 14N,45 220 0SF7.0 8220.00 4521.49 MinR-OSF 278.89 235.27 2721.67 264362 18.4 OSF1.W 14520.W 6883.66 Min%-OSF 2911.35 23].]7 2752.46 26735 18.45 OSF1.50 14680.7 6923.15 Mine-OSF 2989.86 248. 2823.] 2]41.1] 1810 OSF1.50 1We0.W 7054.54 Mi.lN-0-SF 3039.57 20.70 2872.11 2788.811 18.25 OSF1.50 1760.27 7128.25 Min% MinPt-0.SF 3048.18 251.10 2880A5 2]9]08 18.2A OSF1.50 1050.7 7128.25 MinPt-OSF 3079.58 250.70 2912.12 2828.88 18.4A 0SF1.50 1837.00 7113.38 MmROSF 3090.7 249.05 2924.51 28418 18.6A 0SF1.50 1647.00 ]088.97 MmRP F 3108.69 251.4 2940.]5 285]2 1861 0SF1.W 16640.00 6972.66 3109.03 251.96 2940.] 2857.0 18.58 0SF1.W 16910.00 6943.96 Minft 3120.57 20.48 2953.26 2870.10 18.76 OSF1.W 17300.7 Minft 7]8.12 MhP1-O-SF 3128.06 2W.28 296088 28]].78 18.82 OSF1.50 17452.56 6713.25 TD H16A-LOt(P3)(Def Plan) 238.13 32.81 236.84 205.32 N/A MAS =1000 (m) 000 000 Pass Surface 238.13 32.81 236.84 205.32 144]48.39 MAS =10,00nn) 35.25 3525 WRP Schlumbereer-Private 237.31 32.81 234.95 204.50 219.92 MAS =10.00(3) 220.00 220.00 Min% 237.35 32.81 234.88 204.54 199.68 MAS=10.00 (m) 240.00 240.00 265.11 32.81 258.9 232.31 53.54 MAS 10.W(.) 960.00 957.84 MINPT-0-EOU 265.14 32.81 258. 232.34 52.99 MAS =10.W(.) Min% 970.0 967.69 MINPT4 EOU 304.50 32.81 294.10 271.69 33.2 MAS =10.00 (m) 1500.00 1473.74 763.26 61.95 721.59 701.32 18.8 OSF1.50 4320.00 $071.57 Min% -O -SF MInR1 SF 827.83 66.69 782.99 761.14 189 OSF1.W 4650.00 3194.26 MmPt-O-SF 1358.71 122.46 1276.69 1236.25 16.78 OSF1.W 7050.00 4086.52 1496.97 102.59 1428.21 1394.39 22.12 OSFi.W 7]20.00 4335.60 MinPt-04iF 1562.67 106.99 1490.97M5.69 22.13 OSF1.50 W46W 4454.57 MhN-OSF 1577.30 107.97 1504.94 1469.33 22.13 051,1.50 8110.00 4480.00 MhP1-0.SF 16W.31 109.76 1526.77 1490.56 22.0 OSF1.50 8220.00 4521.49 MinPt-O-SF 2878.89 235.00 2721.W 2643.89 18.4 OSF1.50 14520.00 8883.6 MInPt-O-SF MNPt-0 F 2911.35 07.W 2752.64 2673.85 180 OSF1.50 14600.00 6923.15 3025.87 242.45 2863.91 2783.4 18.7 OSF1.5D 15200.00 7081.74 MinPt-"F 3087.19 289-wr 280, 2797.36 160 OSF1.50 1550.0 7124.51 Mlnk-OSF 3102.30 2W.5 2907.99 2811.32 16..R OSF1.50 15680.27 7128.25 MlnPts 3162.49 29]46 2963.86 2865.04 16.00 051,1.50 1833.00 7113.38 MinPt-O-SF 3206.91 305.09 3003.19 2901.82 1581 OSF1.50 170W.00 688443 MmPt-O-SF 321].1 297.1 3018.]4 2920.02 16.2 OSF1.50 17452.56 6713.25 MInlst- F - MlnPfs H16A-L04(P3)(Oef Plan) 238.13 32.81 236.4 205.32 NIA MAS =10.00 (m) 0.00 0.00 Pass 238.13 32.81 236.84 205.32 144748.39 MAS =10.W(m) 35.25 35.25 Surface 23231 32.81 234.95 204.00 219.92 MAS =10.00(.) 220.0 220.W WRP 237.35 32.81[_234.88 20454 199.69 MAS =10.00(m) 240.00 240.W MinPls 265.11 MINPT40.EOU 32.81 258.0 232.31 53.54 MAS -10.00(m) 980.00 957.84 Min% 265.14 32.81 2M.8 232.34 52.99 MAS =10.00(.) 970.00 967.69 304.00 32.81 294.10 271.6 33.28 MA5=10.W(m) 1500.0 1473.74 MINPT4 EOU Min%-0.SF 76326 61.0 721.59 701.32 18.m OSF1.50 4320.0 3071.57 827.83 5.69 782.99 761.1 189 OSF1.50 4600.00 3194.28 ManPt-O-SF 135.71 122.46 1276.69 1236.2 16> OSFL50 7000.00 4086,52 MmPt-0.SF 1496.97 102.59 1428.21 1394.3 22.12 MF .50 7720.00 4335,60 Minlst- SF 152.67 106.99 140.97 1458 22.13 OSF1.W 8040.00 4454.67 MInPt-"F 1577.30 107.97 1504.94 1469 33 221 OSF1.W 8110.00 4400.60 Minm-OSF 1000.31 109.76 1528.77 1490.56 22.08 OSF1.50 8220.0 4521.49 MlnPt-O-$F 2878.89 235.00 2721.85 2643.89 18.46 OSF1.50 14520.00 8863.66 MhPt-O-SF 2911,35 237.50 2752.64 2673.85 18.47 OSF1.50 14600.0 6923.15 MlnPt-0.SF 3025.87 242.45 2863.91 2783.42 18.7 OSF1.50 152W.00 7081.74 MlnP1-O-SF 3087.19 269.8C 2893. 279].36 16.0 OSF1.50 15530.00 7124.51 MInP1-O-SF 3102.30 290.5 2907.99 281132 16.0 OSF1.50 1550.27 7128.25 MlnPts 3162.49 297.48 2963.86 2865,04 16.00 OSF1.W 16300.00 7113.36 MinP1-04iF 3206.91 305.09 3003.19 201.82 1581 OSFi.W 17050.W 6884.43 MlaPt-O-SF 3210.00 292.38 301586 2918. 1fi.52 OSF1.50 17120.00 (54.W MInPt-O-SF 321].10 294]1 3020.30 2922.3 16.4 OSF1.50 17230.00 00789 MInPl-O-SF 3221.79 29446 3925.15 2927.33 16A6 OSF1.50 17452.56 6713.25 MinPle TO H16A-LO6 (P3) (Def Plan) 238.13 32.81 25.84 205.32 N/A MAS =10.00(m) 0.00 0.00 Peva 238.13 32.81 23684 205.32 144748.39 MAS =1600 (m( 3525 35.25 Surface 23].31 32.81 234.95 204.5 219.92 MAS =10.W(m) 220.00 220.00 WRP 237.35 32.81 234.88 204.54 10.69 MAS=10.00 (m) 240.W 240.W MinPls 25.11 32.81 258.90 232.31 53.54 MAS =10.00 (m) 900.00 957.84 MINPT-6EOU MInft 25.14 32.81 258.5J1 23234 52.99 MAS =10.00 (m) 970.00 967.69 304.50 32.81 294.10 271.69 33.2 MAS =10.00(m) 150.00 1473.74 MINP74}EOU MlnP1-OSF 70.26 61.0 721.59 701.3 18.8 OSF1.W 4320.00 3071.57 Min%-OSF 827.83 W.5 782.99 761.14 1892 OSF1.50 450.00 3194.26 MinP1-O-SF 1358.71 122.6 1276.69 123625 .]8 16 OSF1.W 7050.W 456.52 1496.97 102.59 1428.21 1394.3 22.12 OSF1.50 7]20.0 4335.W WnPt-O-SF 1562.67 108.99 1490.97 1456.61 221 OSF1.50 8040.00 4456.57 MmP1-O-SF MMRF 15..30 107.97 1504.94 1469.33 22.1 OSF1.50 9110.00 44W.W MmPt-OSF 150.31 109.76 1528.7714W.5((( 220 OSF1.M 8220.00 4521.49 MmP1.O-SF 2878.89 235.00 2721.85 2W as 1846 OSF1.W 14520.W 653.66 2911.35 237.50 2752.64 2873.85 18.47 OSF1.W 1450.00 6923.15 MinPt-OSF Mint-0.SF Schlumbeger-Private 3025.87 242.45 2863.91 2]83.42 j 18.7 OSF1.50 15200.00 ]081.]4 MinPt.OSF 3087.19 289.8 2893.E 2797.3 160 OSF1.50 15530.00 7124.51 Mlnpis 3102.30 290.98 2907.% 2811.3 16.0 OSF1.50 15660.27 7128.25 MinPt-O-SF 3162.49 297.46 296386 2865,N 1600 OSF1.50 16300.00 7113.36 MinPt-OSF 3208.91 3210.90 3217.10 305.09 292.36 29471 300319 2901.82 15.81 3015.66 2918. 16.5 OSF1.50 OSF1.50 OSF1.50 IMOM 1712000 17230.00 6884.43 6854.66 6807.89 MlnPt-OSF MinR-O-SF MmPls 3020.302922.39 16A 3221.]9 294.46 3025.15 2927.33 16A6 OSF1.50 17452.56 5713.25 TD HI6 02(P3)(Def Plan) Pass 238.13 32.81 236.84 205.32 N/A MAS =10.00 (m) 0.00 000 Surface 238.13 23].31 32.81 23664 205.32 144748.39 32.81 234.95 204.50 219.92 MAS =10,00(m) MAS =1000 (m) 35.25 220.00 35.25 220.011 WRP Minpts 23735 265.11 32.81 32.81 234.88 258. 204.54 199.69 232.31 53.54 MAS =10.00(m) MAS = IOM (m) 24000 96000 240.00 957.84 MINPT-O.EOU MinPts 265.14 32.81 258. 232.34 52.99 MAS =IOM (m) 970.00 967.69 MINPT-O-EOU 304.50 32.81 294.10 271.69 33.2 MAS =1000 (m) 1500.00 14]3.]4 MmPt-0 F 763.26 61.95 721.59 7D132 188 OSF1.50 4320.00 30]1.5] MinRI F 827.83 66.69 782.89 761.14 18.92 OSF1.5D 4850.00 3194.26 MinPt-0SF 1358.71 1496.97 1562.67 15]].30 1600.31 2878.89 2911.35 3025.87 3087.19 3102.30 122.46 102.59 105.99 10].9] 10916 MOD 237.50 242.45 289.8 290.98 1276.69 1428.21 1490.97 1504.94 1526.77 2721.85 2752.64 2863.91 1236.25 1394.39 1455.6 1469.33 1490.56 2643,89 26738 2783.42 1878 22.12 22.13 22.1 220 18 4A 18.473 187 OSF1.50 OSF1.8 OSF1.50 OSF1.50 QSF1.50 OSF1.W OSF1.50 OSF1.50 OSF1.W OSF1.50 7050.00 ]720.8 804000 8110.00 8220.00 14520.00 14680.00 15200.00 1553000 15880.2] 4086.52 4335.60 4454.57 4480.60 4521.49 68153.66 6923.15 ]081]4 7124.51 7128.25 WPI.OSF MinPI-O-SF WPI-0.SF MInPI-0.SF MinPt."F MmPt-0.SF MMR-OSF MinPt-OSF MmPls MhPt-0.SF 2893.6 2797.36 16.03 2907.99 2811.321 16.9 3162.49 297A6 2983.86 2865.04 16.0 OSF1.50 16300.00 7113.36 WnPI-O-SF 3208.91 305.09 3003.19 2901.82 15.81 OSFIM 17050.00 6884.43 Min%-OSF 3210.90 3217.10 292.36 294.71 3015.66 2918.54 16.5 OSF1.50 OSF1.50 17120.00 17230.00 6854.66 6807.89 MMRF WPM 3020.30 2922.39 16.4 322179 294.46 3025.15 2927.33 16.46 OSF1.50 17452.56 6713.25 TO H16A{05(P3)(Def Plan) 238.13 3281 236.84 205.32 N/A WS 10.M (m) p.W 0.00 Pass Surface 238.13 237.31 32.81 236.84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS=ID.W (m) MAS =10.00 (m) 35.25 220.00 35.25 22000 WRP MinPls 237.35 265.11 32.81 32.81 234.88 258.90 204.54 199.69 232.31 53.54 MAS 10.00 (m) MAS =10.00(m) 240.00 980.00 240.00 957.84 MINPT-O-EOU MInft 265.14 32.81 258. 23234 52.99 MAS=10.00 (m) 970.00 987.89 MINPT-0.EOU 304.50 32.81 294.10 271 SG 33.2 MAS=10.00(.) 1500.00 1473.74 _ MinM-,NSF 763.26 61.95 721.59 70132 18.80 OSF1.50 4320.W 3071.57 MlnPI-0SF 827.83 66.69 782.99 761.1 16.92 OSF1.50 4650.8 3194.26 MMPI-0.SF 1358.71 122.46 1276.69 1236.25 16.]8 OSF1.50 705000 4086.52 MInPt-O-SF 1496.97 102.59 1428.21 1394.39 22.12 OSF1.50 7720.00 4335.60 Mii-R0SF 1562.67 106.99 1490.97 145669 22.1 OSFL50 8040.00 4454.57 MlnPt-"F 1577.30 107.97 1504.94 1489.33 22.1 OSF1.50 8110.00 4480.60 MlnPt-0 F 1600.31 109.76 15267] 148056 22.0 OSF1.5D 8220.00 4521.49 MInN-"F 2878.89 2911.35 3025.87 387.19 3102.30 3162.49 235.00 237.50 242.45 289.82 28.8 297.46 2721.85 2752.64 2863.91 26,1189 26738 278342 1848 18A 16.7 OSF1.50 OSF1.W OSF1.8 OSF1.50 OSF1.50 OSF1.50 14520.00 14680.00 15200.W 15530.W 15660.27 1638.8 6863.66 6923.15 ]081.]4 7124.51 7128.25 7113.36 MinPt-OSF MinPt-O-SF MinPt-0-SF MmPls MlnPt-O-SF MinPI-O-SF 2893. 2]97.3 18.0 281.99 2963.86 2811.32 2865,04111 16. 16.0 328.91 3210.90 3217.10 305.09 3003.19 292.36 301566 29471 3020. 2901.82 2918.54 15.81 165 OSF1.50 OSF1.50 OSF1.50 1]050.00 17120.00 17230.00 884.93 850.66 807.89 MInPI-0.SF MmRP SF MnPN 2922.3 16.4 3221.79 294.46 3025.15 2927.33 16,46 OSF1.50 17452.56 6713.25 TD H16A-L03 (P3) (Def Plan) P.238.13 32.81 23884 205.32 N/A MAS =10,00(m) 0.00 0.00 Surface Schlumbeger-Prbata 238.13 23].31 32.81 236.84 205.32 144748.38 32.81 234.95 204.50 218.82 MAS=10.00(.) MAS=10.00 (m) 35.25 220.00 35.25 220.00 WRP Min%s 237.35 285.11 32.81 234.88 32.81 258.90 204.54 199.69 232.31 53.54 MRS =10.W MAS=10.00(m) 240.00 96080 240.00 957.84 MINPT-O-EOU MInPI.s 286.14 32.81 258. 232.34 52.99 MAS =10.00 (m) 970.00 96].88 MINPT-0.EOU 304.50 32.81 294.10 271.6 33.2 MAS =10.00 (m) 1500.00 14]3.]4 Min%OSF 763.28 61.95 721.59 701.3 18.80 OSF1.50 4320.00 3071.57 Min%-"F 827.83 66.89 782.99 761.1 18.92 OSF1.W 4850.00 3194.26 Min%-0SF 1358.71 1498.97 122.48 1276.69 102.59 1428.21 1236.2 1394.39 16.]8 22.12 OSF1.50 OSF1.50 ]050.00 772080 4086.52 4335.60 Min%-O-SF Min%-0-SF 1582.87 15)1.30 1800.31 2878.89 2811.35 106.98 1490.9] 107.97 1504.94 109.78 1528.7] 235.00 2721.85 237.50 2]52.84 1455.89 1489.33 1490.58 28438 26]3.85 22.1 22.13 22.08 16. 18.47 OSFL50 OSF1.50 OSF1.50 OSF1.50 D$F1.50 8040.00 8110.00 8220.00 14520.00 1/680.00 4454.5] 4480.80 4521.49 8863.88 8923.15 Min!NOSF Min%0SF Min%-0-SF Min%-0SF Min%-0SF 3025.8] 308].19 242.46 2883.91 289.82 2893.8 278342 18.7 OSFt.50 OSF1.50 15200.00 15530.00 7081.]4 7124.51 Min%-O-SF Min%s 2797.36 18.0 3102.30 290.98 2907.98 2811.32 16.0 OSF1.50 15880.27 7128.25 MmPtOSF 3182.49 297.46 2963.86 2865.0 160 OSF1.50 16300.00 7113.36 Min%-O-SF 3206.91 305.09 3003.19 290182 15.81 OSF1.50 17050.00 8884.43 MInR-"F 3210.90 3217.10 292.36 3015.68 29185 294.71 3020.3 2922.3 16.5 16.42 OSF1.50 OSF1.W 17120.00 17230.OD 8854.88 8807.89 Min%-0SF Minpm 3221]9 29446 3025.15 2927.33 16.48 OSF1.50 17452.58 6713.25 TO H18A(P3)(Def Plan) 236.13 3281 238.04 205.32 NIA MAS =10.00 (m) 000 0.00 Pass Surtace 238.13 23].31 32.81 236.84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS =10.00(m) MAS =10.00(m) 35.25 220.00 35.25 220.011 WRP Min% 237.35 285.11 32.81 234.88 32.81 258. 204.50 199.89 232.31 53.54 MAS=10.00 (m) MAS 10.W 240.00 95D.D0 240.00 957.84 MINP 4OEOU Minft 265.14 32.81 258. 232.34 52.99 MAS 10.W (m) 97080 987.69 MINPT-O-EOU 3114.50 783.26 32.81 294.10 61.95 721.59 271.H 701.32 33.2 18.8 MAS =10.00 (m) OSF1.50 1500.00 4320.00 1473.74 3071.57 Mln%0SF Mln%OSF 82].83 88.69 782.99 761,14 189 OSF1.50 4650.00 3184.28 Min%.OSF 1358.71 122.48 1278.89 1236.25 16.78 OSF1.50 7050.00 4088.52 Min%-OSF 1496.97 1562.67 1577.30 102.59 1428.21 106.99 1490.97 107.97 1504.94 139439 1455.69 14683322.13 22.12 F 22.13 OSF1.W OSF1.50 OSF1.50 7720.0D 8040.00 8110.00 4335.60 4454.57 4480.80 Min%-OSF Min%-O-SF Mln%-0.SF 1600.31 2878.89 109.76 1526.77 235.00 2721.85 1490.56 2643.89 22.08 18.4 OSF1.50 0SF1.50 8220.00 14520.00 4521.49 6863.86 Min%0SF MinPt - F 2911.35 237.50 2752.64 2673.85 18.4 OSF1.5D 14680.00 6923.15 Min%-0SF 3025.87 24245 2863.91 278142 18.7 OSF1.50 15200.00 7081.74 Min%-0SF 3087.19 289.82 2893.8 279]3616. OSF1.W 15530.0D 7124.51 Min P6 3102.30 291198 2907.99 2811.3 18. OSF1.50 15860.27 7128.25 Min%-O-SF 3182.49 297.46 2963.86 2885.11 16.0 OSF1.50 1630080 7113.36 Min%-0-SF 3206.91 3210.90 3217.10 305.09 3003.19 282.36 3015.68 N4.71r 3020. 2901.82 2918.5 15.81 16.5 OSF1.5D DSF1.50 OSF1.80 17050.00 17120.00 17230.00 8884.43 685488 8807.89 Mln%-0SF Min%OSF Mine 2922.3 164 3221.79 294.46 3025.15 2927.33 16.46 OSF1.50 17452.56 671325 TO H16PB1(Def Survey) Pass 238.13 32.81 238.84 205.32 NIA MAS =10.00 (m) 0.00 0.00 Surtece 238.13 23).31 32.81 236.84 205.32 144748.39 32.81 234.95 204.50 219.92 MAS =1080 (.) MAS =10.00(m) 35.25 220.00 35.25 220.00 WRP Min%s 237.35 285.11 265.14 32.81 234881 32.81 258.90 32.81256.8 204.54 189.69 232.31 53.54 232.34 62.98 MAS = 10.00 (in) MAS =10.00(m) MAS=10.00(.) 240.00 980.00 970.00 240.00 957.84 967.89 MINPTOEOU Min% MINPT-O-EOU 3(14.50 32.81 294.10 2]1.69 33= MAS=I0.00Im) 1500.00 14]3.74 Min%-OSF Schlumberger-Private Schlumberger -Private 763.26 827.83 62.00 88.]3 721.58 ]82.96 ]01.2] ]61.09 18.]8 1890 OSF1.50 OSF1.50 432080 4850.003194.W 30]1.5] MinP14SF MInR-O-SF 1358.71 122.52 12]6.85 1236.19 16.]8 OSF1.50 7050.00 4086.52 MmR-O-SF 1496.97 10258 1428.14 1394.2 22.0 OSF1.5D 7720 0.0 4335.80 MinR-0SF 1562.67 157].30 107.09 108.08 1480.90 1504.8] 1455.58 1469.22 11 22. 22.11 OSF1.0 OSF1.50 8040.00 811D.W 4454.57 4480.60 Ming-0SF MinPI-0-SF 160.31 2878.89 2911.35 2989.86 109.87 1526.69 149D.45 235.27 2]21.6] 2643.8 23].7] 2752.46 2673 5t 248.6 2823.] 2]41.1 22.0 18.4 1841 18.10 OSF1.50 OSF1.50 OSF1.50 OSF1.W 5220.00 14520.00 14680.00 1500.00 4521.49 886386 8923.15 7054.54 MhR-O-SF MmPI-0-SF MInPt-"F Min% 3039.67 3048.18 25070 251.10 2872.11 2880.45 27886 2]9],0 18.25 18.27 OSF1.50 OSF1.50 15660.27 15850.97 7128.25 7128.25 MInPt-0SF MinPt-O-SF 3079.58 W0.87 250.70 249.05 2912.12 2924.51 282888 2841.82 18.4 186 OSF1.50 OSF1.50 1830.0 18450.00 7113.38 7088.97 MlnPI-O-SF MInPt-O-SF 3108.69 3109.03 3120.57 251.4 2940.]5 251.96 2940.] 250.48 2953.26 285]2 18.61 OSF1.50 OSF1.50 OSF1.0 16840.00 16910.00 1]300.00 6972.66 694396 6778.12 Min% _ MinPls Ming -O -SF 285]0 18.58 2870.1 18.76 3128.06 25025 2960.88 28]7]8 18.82 OSF1.50 17452.56 6713.25 TO Stanchkof State 1(Def Survey) 13221.03 32.81 13219.74 13188.22 N/A MAS =10.00 (m) 000 0.00 Pass Surface 13220.75 13220.4 32.81 32.81 13219.44 13218. 13187.94 448348.65 11 16316.95 MAS =40.00(m) MAS =10.00 (m) 35.25 250.00 35.25 250.00 WRP MInP18 1318].8 13190.34 32.81 13177.81 13157.5 1173.7 MAS =10.00 (.) 910.00 908.51 MinPt-0SF 13081.08 12815.07 11404.74 9911.46 8728.83 32.81 37.17 49.45 66.17 81.11= 13063.91 13046.25 12789.81 12]]].90 11371AD 11355.29 9686.36 045.29 826.63 537.91 360.64 235.20 MAS =10.W(.) OSF1.50 OSF1.50 OSF1.50 OSF1.50 1380.00 10D.0 3830.97 560.0 7050.00 1382.49 1890.77 2889.41 3547.44 4056.52 MmPt-OSF MlnPt-O-SF MhPt-O-SF MInPI-OSF MlnPls 864].]2 1694 7498.68 80.29 ]443.54 7418.4 149.02 OSF1.5D sw 00 16]].80 MInR-"F 5559.93 4528.58 4360.70 4339.12 126.05 182.52 2W.81 297.31 547394 400517 4216.45 4205.21 5433.87 4346.04 4149.89 4138.81 69.31 37.88 32.6 32.67 OSF1.0 OSF1.50 OSF1.50 OSF1.50 11550.00 14220.W 15760.0 IW7O.W 5759.50 6752.13 7128.25 7128.25 MlnPI-0SF MinPt-O-SF MhPt-0.SF MMPI8SF 4330.99 4328.14 4328 0.9 199.7 199.76 199.59 4197.31 4192.0 417.54 4131.0 41W.39 4121.39 3266 OSF1.50 OSFI.SD OSF1.W 15970.00 16050.00 18180.00 7128.25 7128.25 7124.53 MInR-0.SF MInR-"F MinR.OSF 431958 199.57 4188.16 4120.01 32.64 OSF1.W 16240.97 7119.7 MmR-OSF 4318.591 4318.29 4318.10 99.48 418523 195.5 418].5 195.02 417.71 4119.11 32.65 OSF1.0 OSF1.50 OSF1.50 16WD.W 16330.0 18397.00 7113.36 7109.10 7101.78 MmRs MINPT-O-EOU Ming -=t 4122.70 33.30 4123.08 3340 4404.20 180.34 4283.60 4223.86 36.85 OSF1.50 17452.56 6713.25 TD C smopolltan State 1 (Def SUNey) Pass 18223.16 18223.13 18223.12 32.111 18221.18 3281 16221.15 32.81 174 1610.35 NIA 18190.32 N/ 1819031 N/A MAS =10.97 Im) MAS =10.00 (m) MAS =10.W (m) 0.00 20.00 30.0 0.00 2000, 30.00 Surface Ming-O-SF MINPT-O-EOU 18223.12 18038.42 32.81 18221.14 18190.31 N/A 3281 18029.70 18005.62 2721.9 MAS =ID.W(m) MA5=10.00(.) 35.25 150.0 35.25 1473.74 WRP MhR- SF 13688.31 1102.49 8182.55 65.42 81.60 151.04 13643.10 13622.89 3386 OSF1.50 OSFI.SD OSF1.0 7050.00 10410.00 14480.00 4086.52 5335.67 6841.36 MinPts MMR43SF Ming-OSF 1045.64 878.61 10920,89 222.10 8031.50 86.75 6922.33 6156.12 182.67 10.20 6]9].40 6739.6 59.86 OSF1.0 OSF1.W 16300.97 17452.56 7113.36 6713.25 MmKR SF Mine 6026.81 59fi5.92 6D.65 Schlumberger -Private North Intermediate hole xnw�,ge,.ex.m Production hole JueC est Energy Attachm Cosmopolitan Project H04 -L04 10-401 Fishbone APD Attachments H04 -L04 10-401 Fishbone APD Attachments NOTE: The Rib Laterals in H04 are left as open hole completions after drilling, and as such, there are no casing design nor cement volume calculations to present in this section of the respective L01 through L07 Lateral APD's. lNest Energy Attachmen Cosmopolitan Project H04-1-04 10-401 Fishbone APD Attachments H04 -L04 10-401 Fishbone APD Attachments NOTE: The Rib Laterals in H04 are left as open hole completions after drilling, and as such, there are no FIT / LOT Procedures to present in this section of the respective 1-01 through L07 Lateral APD's. /I eNest Energy Attachrr Cosmopolitan Project H04-1-04 10-401 Fishbone APD Attachments H04 -L04_10-401 Fishbone APD Attachments nlue esr Energy Cosmopolitan Project BOP & Choke Manifold Configuration 5K# WI H 10K# 49 3/32" BOTTO FLANGE 1° N 66 5/8" o M ® �LO a a. �D ai 27 3/4" 0 i� 41 11/16" 13 5/8"X10K# CAMERON BOP STACK BLUECREST ENERGY 13 5/8-MOK CARBON BOP STACK 2 --TAfESY. ua'o _ - - - _FS 1 1/6/161 LftWARWKaIEW-.._.-. 6/22/15 4- 1-1 e.1 1o.., n1u I=: B5BC7002 2 10-401 APD Attachments BOP & Choke Manifold Configuration W 0 v 20 IM a 6Nlmas w6 01E Wa � es lean pLEfpN J 1 16 % IIX FIC VKVE 11 2 tllINO%V 2 1 16 % IIX f)G 2i0 Y11VE t FROM W BORE aadn tK6 E J I Ic 6q6 % 1IX 1 5'I0G0 InD U161� J 1 IC % IN I NEWIE QWS IIX 2 i �I WMA E DOM J 0/16' % 10 VALVE 11 R/�S K10 41610: V1UM 2 1/16' % la I COBE 60UIKK VALVE OM WEtI - N O I 1 I A VIEW A SHAKER LINE SHAKER LINE PANIC LINE POORER SSER PANIC LINE D� CAMERON 3 1/16 X 10K C & K MANIFOLD 1O BLUECREST ENERGY 1. 3. J. fJJIEXCNJ116% to C kK WAFOLD � u I• I .I 0 lst Energy Diverter r-- 'OPENING PORT I -- (� J l CLOSING PORT G FLANGED ----- M AS CAST N --0----- I —O— --- B Cosmopolitan Project BOP & Choke Manifold Configuration E CAST —1 a P AS CAST I -T- _ K F CLAMP — L AS CAST HUB Nominal Dimensions—Inches—with 2000 psi Bottom Connections A B I C D E F G H J K L M N 0 P 5244 Hub 16.' 51 .. 12r'x 23% Tri 6i,. 27th 461E 5114 5644 62% 60 1% Lub sovs6 Nominal Dimensions—inches—with 3000 psi Bottom Connections A B Hi�pp &W117 C D 121h I E I F I 1 Hub 1 231A 515 G H J gr. On 27th K 45Y. L 513. M 561'. N 5244 O I P 50 W. 54Y. 10-401 APD Attachments BOP & Choke Manifold Configuration lNest Energy Attachment r Cosmopolitan Project 1-104-1-0410-401 Fishbone APD Attachments H04 -L0410-401 Fishbone APD Attachments Ilue est Energy Cosmopolitan Project Wellhead/Tree u 1/:b )pA FS I I I I j I I\ I L ll]e 5,000051 s ` e 5 051 w/VOaz sFM 09fo L -M bJ1' 5s sir s,00G ry I v1!' s.Op1051 M5 z Ulb' S..M 951 NSF I 10 SIY 5,000 051 e Cl + I 1 •� I 1 VX OM 65.9]' SA'CY. MGP M05' I ' i I I xssnr snaonl I I ��5lrlwf(D MAWNEI MMK E0 I I MW I I 1 I I I I I 0-222_W VILLKaa S15T[11 m'WCY I ��.,2y—•:.��7 tx 1 cilli li Sn nir 1-11? u fl9'OO6G.---"'tel _44.SL""xli !IG SM rpTIM'"KEN 9519'00 T _ •l/2'OO �1~ I IMM FIN 10-401 APD Attachments Wellhead/Tree 131 ue(.-iest Energy Attachment 7 Cosmopolitan Project H04 -L04 10-401 Fishbone APD Attachments H04 -L04 10-401 Fishbone APD Attachments NOTE: The Rib Laterals in H04 are to be drilled from an open hole mainbore below the 9- 5/8" casing shoe using the BlueCrest Rig 1 BOP stack and choke manifold for well control (no Diverter system applicable), and as such, there are no Diverter Schematics to present in this section of the respective L01 through L07 Lateral APD's. tSlueNesr Energy Attachment 8: Cosmopolitan Project 1-104-1-04 10-401 Fishbone APD Attachments H04 -L04 10-401 Fishbone APD Attachments H04 and H04 -L04 with 1000' Radius Around Production Section ADL38440 Corfu ent"21111 'G2971SH W.Sr,H14 SEC 26. T35. R15W. SM H72 SEC J]. T35, R15W. SM Ha,s�H12-L en 1 H12 -L T 1 Hansen 1A H04-1-04 Surface Location (NAD 27) Northing: 2,144,623.03', Easting 168,812.80' 2,173' FSL, 1,552' FEL, Sec. 2, US, R15W SM Surface Casing Point Northing: 2,145,687.06', Easting 165,349.46' 3,143' FSL, 5,044' FEL, Sec. 2, T4S, R15W SM Kick Off Point Northing: 2,149,999.68', Easting: 154,113.81' 1859' FSL, 548' FEL, Sec. 32, T3S, R15W SM Total Depth Northing: 2,150,864.47', Easting: 152,833.34' 2,68T FSL, 1,852' FEL, Sec. 32, T3S, R15W SM mossomor- H-1$LO SEC 4. T4S, R15 W. SL: Cosmopolitan Unit Development Data 26/09/2018 Comparry I BlueCrest Energy T3S. R15W. SM ADL18790 0 1000 2000 3000 4000 50001t11S 1:30000 SEC 35, T35, R1�W ,4!0 SEC 36, PETREL. IueC,fest Energy Attachm Cosmopolitan Project H04-1-0410-401 Fishbone APD Attachments H04 -L0410.401 Fishbone APO Attachments NOTE: The 20" Conductor and Surface Slot Location as -built schematic for H04, to be prepared by Lounsbury Surveyors, will be provided to include in this APD package when the 20" is set and the as -built schematic is completed. tSlue)est Energy Attachment 10: Cosmopolitan Project 1-104-1-0410-401 Fishbone APD Attachments H04 -L04 10.401 Fishbone APD Attachments NOTE: The New Well Elevation Form for H04, to be prepared by SLB Directional Drillers, will be provided to include in this APD package when the BlueCrest Rig 1 is on the H04 well, actual elevation measurements can be taken, and the surface slot as -built schematic has been completed. TRANSMITTAL LETTER CHECKLIST WELL NAME: GL <'� ! C PTD: Z/ /.5L) LATERAL Development _ Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: "5Z__eA POOL: % (/(dL T . 6� t / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI Permit The permit is for a new wellbore seg.m�e7nt �f e�xi,�sti,n�r LATERAL /well No. 7__A,—/ ,�& API No. 50-� ,/ V (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50 --- from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 davs after com letion, sus ension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool HANSEN, HANSEN UNDEF OIL - 290100 Well Name: HANSEN H-04-1-04 Program DEV Well bore seg ❑d PTD#:2181300 Company BLUECREST ALASKA OPERATING LLC _ _.. _.. Initial Class/Type DEV/PEND GeoArea 820 _ Unit 10370 On/Off Shore On Annular Disposal ❑ Administration 17 Nonconven. gas conforms to AS31.05.030(j.1.A),0.2.A-D) NA 1 Permit fee attached _ NA _ 2 Lease number appropriate Yes Surface Location lies within Fee -Hansen; Portion of Well Passes Thm ADL0018790; 3 Unique well name and number Yes TO lies in ADL0384403. _ 4 Well located in a defined pool _ _ No Hansen Undefined Oil Pool 5 Well located proper distance from drilling unit boundary Yes 6 Well located proper distance from other wells. No SPACING EXCEPTION REQUIRED, HANSEN, HANSEN UNDEF OIL - 290100, governed by statewide spacing re 7 Sufficient acreage available in drilling unit Yes As planned, this well does NOT conform with statewide spacing requirements. 8 If deviated, is wellbore plat. included Yes SPACING EXCEPTION REQUIRED: Well lies within same governmental. quarter section as Hansen 1A. 9 Operator only affected party Yes 10 Operator has appropriate bond in force Yes _ Appr Date 11 Permit can be issued without conservation order No SPACING EXCEPTION REQUIRED: Well lies within same governmental quarter section as Hansen 1A. 12 Permit can be issued without administrative approval Yes SFD 10/17/2018 13 Can permit be approved before 15 -day wait _ Yes _ 14 Well located within area and. strata authorized by Injection Order # (put IO# in comments) (For NA.. 15 All wells. within 1/4 mile area of review identified (For service well only) NA. _ 16 Pre -produced injector: duration of pre -production less than 3 months (For service well only) NA _ 18 Conductor string provided Yes _ Engineering 19 Surface casing protects all known USDW s Yes See H-04 (PTD 218-126) for details 20 CMT vol adequate. to circulate. on conductor & surf csg _ _ Yes 21 CMT vol adequate to tie-in long string to surf csg Mo. 22 CMT will cover all known productive horizons Yes 23 Casing designs adequate for O, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes 25 If a re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes 27 If diverter required, does it meet regulations _ NA Appr Date 28 Drilling Fluid program schematic & equip list adequate Yes GLS 11/5/2018 29 BOPEs,. do they meet regulation Yes 30 BOPE.press rating appropriate; test to (put psig in comments) Yes 31 Choke manifold complies w/API RP -53 (May 84) No 32 Work will occur without operation shutdown Yes 33 Is presence of H2S gas probable No 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit can be issued w/o hydrogen sulfide measures Yes H2S not observed in nearby Hansen wells. Rig has sensors and alarms. Geology 36 Data presented on potential overpressure zones Yes "J-shaped" well branch targets. Starichkof sand and Hemlock. Planned mud weights in conjunction with Appr Date 37 Seismic analysis of shallow gas zones NA Managed Pressure Drilling technique appear adequate to control maximum anticipated downhole SFD 10/17/2018 38 Seabed condition survey (if off -shore) NA pressures of 9.1 - 9.6 ppg, which are based on MDT measurements of reservoir pressure in nearby well. 39 Contact name/phone for weekly progress reports [exploratory only] NA Geologic Engineering Public 4th Lateral spoke . Will be left OH. Commissioner: Date: Co isslone . Date Date it Itedle,