Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-102DATA SUBMITTAL COMPLIANCE REPORT 10/2812019 Permit to Drill 2171020 Well Name/No. PEARL 2 Operator Hilcorp Alaska LLC API No. 50-133-20672-00-00 MD 600 TVD 600 Completion Date 8/8/2017 Completion Status INFO Current Status P&A UIC No REQUIRED INFORMATION Lf � . . c / MnlVLog D16Nr/ Samples Yes✓ Directional Survey No ✓ DATA INFORMATION List of Logs Obtained: GR/CCL, Lithology Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Type Med/Frmt Number Name Scale Media No Log C 28550 Log Header Scans ED C 28550 Digital Data ED C 28550 Digital Data ED C 28824 Digital Data ED C 28824 Digital Data ED C 28824 Digital Data Log C 28824 Log Header Scans Log C 28824 Mud Log 25 Well Cores/Samples Information: Interval Name Start Stop Wet Samples 0 600 INFORMATION RECEIVED (from Master Well Data/Logs) Interval OH/ Start Stop CH Received Comments 0 0 2171020 PEARL 2 LOG HEADERS 596 9 8/29/2017 Electronic Data Set, Filename: Pearl 2 Main Pass.las 8/29/2017 Electronic File: Pearl 2.pdf 10 600 8/29/2017 Electronic Data Set, Filename: H i I corp_Alaska_Pearl_2_LAS.las 8/29/2017 Electronic File: Hilcorp_Pearl_2_600ft_TD_2i n_Fi eld_LithologyLo g.pdf 8/29/2017 Electronic File: H i Icorp_Pea rl_2_600ft_T D_5i n_Field_Litholog yLo g.pdf 0 0 2171020 PEARL 2 LOG HEADERS 10 600 8/29/2017 Lithology Logs, 2" & 5" Sample Set Sent Received Number Comments 8/22/2018 1666 1 box wet samples AOGC(Page 1 of2 Monday, October 29, 2019 DATA SUBMITTAL COMPLIANCE REPORT 10/28/2019 Permit to Drill 2171020 Well Name/No. PEARL 2 Operator Hilcorp Alaska LLC API No. 50.133-20672-00-00 MD 600 TVD 600 Completion Date 8/8/2017 Completion Stap INFO Current Status P&A UIC No Completion Report 0 Directional / Inclination Data Y Dwuti Logs, Image Files, Digital DataOY /^^ nn NCI A II Core Chips Y / Production Test Information Y V Mechanical Integrity Test Information Y / NA Composite Logs, Image, Data Files Y kx,i LCore Photographs y/ Geologic Markers/Tops 9 Daily Operations Summary ) Cuttings Samples DNA Laboratory Analyses Y / NA COMPLIANCE HISTORY Completion Date: 8/8/2017 Release Date: 9/8/2019 Description Date Comments Comments: Compliance Reviewed By: Date: ` ( / AOGCC Page 2 of 2 Monday, October 28, 2019 Guhl, Meredith D (CED) From: Frank, Kevin J (DNR) Sent: Monday, September 9, 2019 9:33 AM To: Guhl, Meredith D (CED) Subject: RE: Pearl 2, PTD 217-102, Extended Confidentiality? No ma'am Petroleum Geologist Resource Evaluation Section Manager SOA -Dept. of Natural Resources Division of Oil and Gas 550 West 7th. Suite 1100 Anchorage, AK 99501-3560 (907) 269-8791 kevin.fra n k@a laska.gov CONFIDENTIAL and PROPRIETARY pursuant to AS 38.05.020(6)(10),(11), and (12) and other applicable laws: This email message including any attachments is for the sole use of the intended recipient(s) and may contain confidential, privileged, or proprietary information also protected under AS 43.05.230 and AS 40.25.100 or other applicable law; any release of this information without proper approval is not authorized. If you are not the intended recipient, any unauthorized disclosure, copying, distribution or action in reliance on the contents of this document is prohibited. If you have received this document in error, please inform the sender immediately and destroy all copies of the original message. From: Guhl, Meredith D (CED) Sent: Monday, September 9, 2019 8:32 AM To: Frank, Kevin J (DNR) <kevin.frank@alaska.gov> Subject: Pearl 2, PTD 217-102, Extended Confidentiality? Hello Kevin, Has Hilcorp requested extended confidentiality for Pearl 2, PTD 217-102, due for release after September 8, 2019? Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.euhl@alaska.aov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith GUN at 907-793-1235 or meredith.euhl CoDalaska.eov. 0 IIiL•uq. ANA.. 1.1.(: DATE 08/22/2018 Seth Nolan Hilcorp Alaska, LLC GeoTech II 3800 Centerpoint Drive Anchorage, AK 99503 Tele: 907 777-8308 Fax: 907 777-8510 E-mail: snolan@hilcorp.com CONFIDENIIAL. To: Alaska Oil & Gas Conservation Commission Meredith Guhl Petroleum Geology Assistant 333 W 7th Ave Ste 100 Anchorage, AK 99501 DATA TRANSMITTAL PEARL STRATIGRAPHIC TESTS WELL SAMPLE INTERVAL PEARL 2 30'- 600' (20 total samples) Please include current contact Information if different from above. ac-- Eby 6c.0 NO LONGER CONFIDENTIPRECENED SEP 0 8 2019 AUG 2 2 2018 AOGCC Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Guhl, Meredith D (DOA) From: Cody Dinger <cdinger@hilcorp.com> Sent: Thursday, December 7, 2017 7:46 AM To: Guhl, Meredith D (DOA) Cc: Davies, Stephen F (DOA) Subject: FW: Formations at TD for Pearl & Seaview Strat Test Wells Hi Meredith, Here are the formations at TD below. Thanks, Cody From: David Buthman Sent: Thursday, December 07, 2017 7:18 AM To: Cody Dinger <cdinger@hilcorp.com> Subject: RE: Formations at TD for Pearl & Seaview Strat Test Wells Hi Cody, Here's the formations at TD listing, below. Rgds, Dave Formation at TD: Strat Test Well Name Formation at TD Pearl 1A Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Seaview 1 Beluga Seaview 2 Beluga Seaview 3 Beluga Seaview 4 Beluga Seaview 5 Beluga Seaview 6 Beluga 1 Upper Mi(, -,e Seaview 7 Sterling DB 12/7/2017 From: Cody Dinger Sent: Tuesday, December 05, 2017 11:28 AM To: David Buthman <dbuthman@hilcorp.com> Subject: FW: Formations at TD for Pearl & Seaview Strat Test Wells Any thoughts on this? From: Guhl, Meredith D (DOA)[mailto:meredith.ftuhl@alaska.eov) Sent: Tuesday, December 05, 2017 11:26 AM To: Cody Dinger <cdinter@hilcorp.com> Cc: Davies, Stephen F (DOA) <steve.davies@alaska.eov> Subject: Formations at TO for Pearl & Seaview Strat Test Wells Hello Cody, I'm starting a review of the data received for the Pearl and Seaview strat test wells (all 14 of them). One of the initial issues I've noticed is none of the 10-407 forms have a formation listed at TO in Box 29. Could you please provide, at minimum, the formation at TD for all Pearl and Seaview wells. Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 mered ith.euhl @alaska.eov Direct: (907) 793-1235 CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.euhl@alaska.eov. STATE OF ALASKA ' ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG Ia. Well Status: Oil ❑ Gas ❑ SPLUG ❑ Other ❑ Abandoned 0 ' Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAG[-] WDSPL ❑ No. of Completions: ib. Well Class: Development ❑ Exploratory ❑ Service ❑ Stratigraphic Test Q 2. Operator Name: Hilcorp Alaska, LLC 6. Date Comp., Susp., or Abend.: 8/8/2017 14. Permit to Drill Number / Sundry: 217-102 3. Address: 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 7. Date Spudded: July 20, 2017. 15. API Number: 50-133-20672-00-00 4a. Location of Well (Governmental Section): Surface: 1655' FSL, 176' FWL, Sec 13, TIS, R14W, SM, AK Top of Productive Interval: N/A Total Depth: 1655' FSL, 176' FWL, Sec 13, T1 S, RI 4W, SM, AK 8. Date TD Reached: July 21, 2017 16. Well Name and Number: Pearl 9. Ref Elevations: KB: t2-{-. GL: 123.6. BF: N/A 17. Field / Pool(s): N/A 10. Plug Back Depth MDfTVD: Surface 18. Property Designation: KPB ROW - 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 204156.16 y- 2227699.78 • Zone- 4 TPI: x- y- Zone- Total Depth: x- 204156.16 y- 2227699.78 Zone- 4 11. Total Depth MD/TVD: , 600'/ 600' 19. DNR Approval Number: N/A 12. SSSV Depth MDffVD: N/A 20. Thickness of Permafrost MD/TVD: N/A 5. Directional or Inclination Survey: Yes U (attached) No Q Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: I N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR -CCL 2" MD, Lithology Log 2"/5" MD RECEIVED SEP 2 2 2017 23. CASING, LINER AND CEMENTING RECORD AOGGG WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM PULLED 6-5/8" 17# A53B 20' 100' 20' 100' 6" 48 sx pumped to P&A 24. Open to production or injection? Yes ❑ No ❑✓ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): QSAN1`'t� •-" 1ATr 11,3 11' ,f:A'vFI', V� 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes U No v - Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED N/A 27. PRODUCTION TEST Date First Production: N/A Method of Operation (Flowing, gas lift, etc.): N/A Date of Test: Hours Tested: Production for Test Period Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Flow Tubing Press. Casing Press: I Calculated 24 -Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (corr): Form 10-407 Revised 5/2017��// /O, 3,gCONTINUED ON PAGE 2 R13DMS �.� SEP 2 9 20Vbmh ORIGINIIAL only '0010441-17'0010441-17S 28. CORE DATA Conventional Core(s): Yes ❑ No 0 ' Sidewall cores: Yes ❑ No ❑� - If Yes, list formations and intervals cored (MD/ VD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� ` If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Permafrost - Base Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval N/A information, including reports, per 20 AAC 25.071. Formation at total depth: f'd&Ue I 8TH /&C, 31. List of Attachments: Wellbore Schematic, Drilling Reports, P&A Photos, As Built Drawing Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Paul Mazzolini Contact Name: Cody Dinger Authorized Title: Drilling Manager Contact Email: Cdin er Q hI cor .Com_ Authorized Contact Phone: 777-8389 Signature: — Date: � , 2 INSTRUCTIONS General: This form and the required attachme provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 41b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 6-5/8, H Wellbore Schematic Casing Detail Location Ninilchik Well Pearl 2 PTD: 217-102 API: 50-133-20672-00-00 Size Type Wt Grade Conn. ID Top Btm 6-5/8" Surf Csg 17 A-53 Weld 6.125" 20 100' i TD=600'/TVD =600' ❑rillina Infn Hole Section I Casing Updated by CJD 09/22/2017 H Well Name: Stratigraphic Test Wells Field: Ninilchik County/State: , Alaska (LAT/LONG): svation (RKB): API #: Spud Date: Job Name: 1741286 Pearl 2 Drilling Contractor AFE #: 1741286 AFF 4 Hilcorp Energy Company Composite Report Adilli ,,.,: ' Ops Summary _. 7/20/2017 MIRU - Spot Rig, cuttings tank, spot pipe truck, post permits and well sign. Talk with surrounding land owners about traffic, everybody good.;Drill 6" hole x 6- 5/8" casing to 100' shoe at 100'). Drill open hole F/100' to 360'. 7/21/2017 MIRU, warm up rig, circ well clean.;Drill 6" hole F/360' MD to TD @ 600' MD. Catch samples every 30'. POOH, LO pipe, clean out cuttings tank, clear location. RDMO. 7/25/2017 MIRU Pollard Eline. Run GR and CBL logging tools. Tag @ 594'. 8/8/2017 MIRU Kraxbarger drilling. Spot rig over well and pipe truck.;Pick up pipe cutter and RIH on 20' of drill pipe. Pressure up on cutter and rotate, good indication of cut. POOH, inspect cutting tool. Good. Cut @ 22'.;PU 30 joints of 1" tubing and RIH. Tag bottom and begin mixing and pumping grout. Pump 48 sx of Bentonite Grout, pull 5 jts every 8 sx pumped. Good returns to surface.;LD all tubing and put back on truck. Pull cut casing joint and lay down. Clean up site. Well P&A'd. RDMO. AS -BUILT: PEARL 2 NOTES: 1. COORDINATES SHOWN ARE BASED UPON DIFFERENTIALLY CORRECTED GPS OBSERVATIONS. 2. AS—BUILT SURVEY CONDUCTED SEPTEMBER 18, 2017. 3. ALL DISTANCES ARE IN U.S. SURVEY FEET. 4. SURVEYED NAVD88 (G12B) GROUND ELEVATION OF PEARL 2 = 123.59' LEGEND: Q AS—BUILT WELL LOCATION, NO CASING VISIBLE AS—BUILT PEARL 2: LOCATED WITHIN RANDI'S ROAD RIGHT—OF—WAY, LEONARD CATLEDGE SUBDIVISION. SPCS NAD27 AK Z4N: LAT= 60'05'16.65058"N LONG= 151'37'13.87559"W N= 2,227,699.78' E= 204,156.16' - OWNER: KENAI PENINSULA BOROUGH ' 0 250 500 FEET L� SCALE OF A`., 49 TH MICHAEL R. LS -11794 rFq' • . • .S�QO� �` ROPESS10RK� -N- i PROJECT LOC a� N PEARL 2 � to rRIET711 11III1! MA Im l Tis Splp r VICINITY MAP: 1" = 1 Mile get LEONARD CATLEDGE SUED. TRACT C LEONARD CATLEDGE SUBD. TRACT B LOT 7 LOT 6 LOT 5 LEONARD CATLEDGE SUBD. WILSON 1977 SUBD. TRACT -A TRACT 1 PEARL 2 LOT a LOT 3 LOT 2 O Rq TRACT 73 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 Nps RO qo 3� c� 2 2� 2y UNSUBDIVIDED ~� SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. RECONN RECON, LLC 481 W. RECON CIR. PALMER, AK 99645 1 DATE: 9/20/2017 1 DRAWING: HilcorpDeepAsBuilt_Deep I SHEET: 1 OF 1 REV: .fes v s IIJ Y h " - �"� , • �:,,ay .,� „mac �. • �� - ,., t � tom.. � . . r w ol c ( Z i" .q i LT Seth Nolan GeoTech II RECEIVES Hilmq .Atmkin, 1.1A: AUG 2 9 2017 AOGCC DATE 08/24/2017 Hilcorp Alaska, LLC 3800 Centerpoint Drive Anchorage, AK 99503 Tele: 907 777-8308 Fax: 907 777-8510 E-mail: snolan@hilcorp.com CONHOENT IAI_ To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician 333 W 7th Ave Ste 100 Anchorage, AK 99501 Log prints and data Prints: 21 7 0 7 9 2$ 5 4 9 Pearl IA: Array Compensated True Resistivity 2" MD, Lithology Log 2'/5" MD NO LONGER CONFIDENTIAL SEP 0 8 2019 Pearl 2: GR -CCL 2" MD, Lithology Log 2"/5" MD 21 7 1 0 2 2 8 5 5 0 Pearl 3: GR -CCL 2" MD, Array Compensated True Resistivity 2" MD, Extended Range Micro Imager with Dip results, Lithology Log 2"/5" MD 21 7 0 80 28 55 1 Pearl 4: GR -CCL 2" MD, Lithology Log 2"/5" MD Pearl 5: GR -CCL 2" MD, Lithology Log 2"/5" MD 21 7 0 94 28 5 5 2 21 7095 28553 Pearl 6: Array Compensated True Resistivity 2" MD, Extended Range Micro Imager with Dip results, Lithology Log 2"/5" MD Pearl 7: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1 7 0 8 1 28 5 5 4 217096 28555 Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: A Id 1„ I Date: Seth Nolan GeoTech II HH6 3rp A1,Wkn_UAl C0NFIOINT IA1 CD: 1 Electric logs Pearl IA Mudlogs Pearl 2 GR -CCL . Pearl 2 Mudlogs Pearl 3 GR -CCL Pearl 3 Mudlogs . Pearl 4 GR -CCL . Pead 4 Mudlogs Pearl 5 GR -CCL . Pearl 5 Mudlogs Pearl 6 Mudlogs . Pearl 7GR-CCL Pearl 7 Mudlogs PEARL-IAACRT 08JUL 17 .PEARL -3 ACRT OSIUL17 . PEARL -6 ACRT 08JUL17 Hilcorp Alaska, LLC 3800 Centerpoint Drive Anchorage, AK 99503 Tele: 907 777-8308 Fax: 907 777-8510 E-mail snolan@hilcorp.com Please include current contact information if different from above. 8/9017 8:18 AM File folder 8/9/2017 8:10 AM File folder 8/9/2017 8:09 AM File folder 81912017 8: 10 AM File folder 819M 178:16 AM File folder 8/9/2017 8:10 AM File folder 8/9/2017 8:09 AM File folder 8/9/2017 8:10 AM File folder 8!912017 8:09 AM File folder 8/9/2017 8:17 AM File folder 8/9/20178:10 AM File folder 81912017 8:09 AM File folder 81912017 8:06 AM File folder 813/2017 8:07 AM File folder SN12017 8:07 AM File folder Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received By: Date: 7,/7- /b2-- Davies, Stephen F (DOA) From: Cody Dinger <cdinger@hilcorp.com> Sent: Tuesday, July 18, 2017 3:41 PM To: Davies, Stephen F (DOA); Schwartz, Guy L (DOA); Quick, Michael J (DOA) Cc: David Buthman; Paul Mazzolini; Cody Terrell Subject: Pearl 2 KPB ROW Permit Attachments: D00071317-07132017141303.pdf KPB ROW permit extension for Pearl 2 is attached. Thanks, Cody 509-768-8196 Get Outlook for iOS<https://aka.ms/oOukef> From: Painter, Jed<jpainter@kpb.us<mailto:jpainter@kpb.us>> Sent: Tuesday, July 18, 2017 3:30 PM Subject: FW: 17-035P To: Cody Dinger <cdinger@hilcorp.com<mailto:cdinger@hilcorp.com>> Cody, Attached is your PEARL 2 extension. Thanks, Jed Road Service Area 47140 E. Poppy. Lane • Soldotna,.Alaska 99669 (907) 262-4427 office, (907) 262.6090 tax www.borough.kenal.ak.us/roads R.O.W. PERMIT - PROJECT SPECIFIC a P MIKE NAVARRE BOROUGH MAYOR 'This permit is to be completed by the RSA Director' [—]Road Construction ®Other: Drilling project — data gathering Category of Road: NIA Width NIA Length NIA Road Names: Randi's Rd RegionlUnit: West 4 Applicant Name: Hilicorp Alaska LLC Contractor: Krakberger Drilling Inspector Name: Jed Painter RSA one # 262-4427 The uired to call the Inspector for a minimum of 6Inspections: For all Road Construction -1Lwhennext ng plat -2st lin (less than 12 Inches deep acted. -3ft is being compacted.-4ial com lesu t in a punch list of Items to complete-5on N -As required by KPO uctlon Standards: - r to all meet or 91 teed all curre and rda. E cs dons must be r -a roved Board or RSA Director and noted o -Due to soil complexities the RSA recommends perms osis icensed road construction contractor andror engineer. -It is the applicant's responsibility to determine the acquu local, slate, or federal permits and to ensure all construction activity complies with all federal aws. -11 is the appli i City to survey the proposed Right -of -Way for consWction and property iota e}ua ad road and all utilities in Way. RSA Special Provisions: Applicant proposes to place a drill rig near the westerly terminus of Randi's Road for the purpose of gathering data. Project Is temporary, planned to span a 5 -day period between 6.15 and 6.20, 2017. Schedule may be adjusted as necessary, but in any case will adhere to project specifications cited in attached application. RSA Special Provisions: Contact Road Inspector prior to start of work. 1. Drill outside of road prism if possible. 2. If drilling through road prism cannot be avoided make road repairs before leaving site. 3. Coordinate with local residents affected to ensure adequate access during times of necessary road closure. Approved: ® Denled: ❑ Revoked; ❑ x 725NA 70 71r* 7 Permit # I _� 35P Permit Issue Date: 5.4.17 Permit Expires: 7.1.17 By RSA Dfrector. -- L� _ Date: 5.4-17 Date approved by RSA Board (If required): NIA Regulation of Traffic Flow During Construction: Permit holder may regulate traffic by (signaget regulatory devicel barricade) during hours of: As required during daylight hours from (date) 6.15.17 to (date) 6.20.17 Zl7- ioZ Davies, Stephen F (DOA) From: Cody Dinger <cdinger@hilcorp.com> Sent: Wednesday, July 12, 2017 10:06 AM To: Davies, Stephen F (DOA); Quick, Michael J (DOA) Cc: Paul Mazzolini Subject: Pearl 2 Locates (Shallow Hazard) (PTD# TBD) Attachments: Pearl 2 Locate Photos.docx; Enstar Locates for Pearl 2,4,5,7.pdf Steve, Please find the attached documentation for Pearl 2 locates. We should hear back from the KPB on the ROW permit extension today and will provide that to you ASAP. Give me a call if you have any questions. Thanks, Cody Dinger 509-768-8196 From: Cody Dinger Sent: Wednesday, July 12, 2017 9:47 AM To: 'Davies, Stephen F (DOA)' <steve.davies@alaska.gov>; Mike Quick <michael.quick@alaska.gov> Cc: Paul Mazzolini <pmazzolini@hilcorp.com> Subject: Pearl 4 Locates (Shallow Hazard) (PTD# 217-094) Steve, Per Permit to Drill Condition of Approval: "Photos and documentation from utility locates that demonstrate successful clearance of the drill site must be provided to the AOGCC prior to spudding of Pearl 4" Please find the attached documentation for Pearl 4 locates. Give me a call if you have any questions. Thanks, Cody Dinger 509-768-8196 i 1 r rte( �.✓ ��. �� _ l' Pearl 2 Locate Photos 4Alaska vneCall NOTICE OF INTENT TO EXCAVATE Header Code Ticket No. 2017280118 Original Call Dave 7/102017 9:12'00 AM vVak To Degin Date 77122017 9'.12 00 .A4 Company HILCORP i ontact Narne. CODY DINGER t ontact Phone (509)-768-8156 ext Cprdacl Fa,, Atornate Contact. Plane NINILCHIK Street RANDIS RD Nearest Intersecting Street Second Intersecting Street: Map Page KA5124 Subdivision. STERLING HWV STANDARD NORMAL Pager. Cell Alternate Phone' Door! Unit. Additional Dig Information PLS Lnr_. 50' RAD OF THE WELL "PEARL 2" AT THE END OF THE CULDESAC ON RANDIS RD. MAPS TO FOLLOW VIA EMAIL WnULO LIKE TO RELIEVE A CALL IF N1C Bilbng Info ,vol 1108 A Type of Work VVA.TER WELLS DPR 4 FT DPR 10 FT Remarks ;:71'3 COORDINATES. LAT 60.071291 LONG 151.637078 1IC;KEI SENT TO ACS KS, HEA HOMER L.1 u �• XIL W� (., 0 w 0 rTi n t7 2 to M 0 cm U m H to W U w N to Cc0 K cr onF— z Z W m r N N z CC 1 i I 1 T Ln 1 L i wl I I I � 1 1 � I I ;r_ V��V% i dd Nw d8 N% dd NN di; N% dd %rK dJ NK dZ ~nw d3 Nh�Nx ddld _N �.Uq I Ii. � 1 Ld f L C-1 W V u IL -J - u 0 ' I i H (P 0 J I i c' I x s x cn LI) Z Z i 2 Y 1 I i m r N N z CC 1 L i I I I � 1 1 � I I � 1 Ld IL -J - CE 0 I i I x s x LI) Z Z i 2 Y 1 I I i lel J J CL ILI LLI L Ln I (n 1�� ; LJ 4laska OneCall NOTICE OF INTEN T TO EXCAVATE Header Code Ticket No. 2017280118 Onginal Call Date 7/102017 9.12:00 APA vVmk To Begin Date 7712/2017 9:12 00 AM Company HILCORP Contact Name : CODY DINGER uontact Phone. (509)-768-8196 ext t ndart Fa,, flBemate Contact. Place, NINILCHIK Street RANDS RD Nearest Intersecting Street Awond Intersechnq Street- Map Page KAS 124 Subdraision. STERLING HWY STANDARD NORMAL Pager: Cell. Alternate Phone: Door / Unit. A4dmonal Dig Information. PLS LOC, 50' PAD OF THE WELL "PEARL 2" AT THE END OF THE CULDESAC ON RANDIS RD. MAPS TO FOLLOW VIA EMAIL. WOULD LIKE TO RECIEVE A CALL IF N/C 6dlmg Info WQ+JOB A Type O(Work DPR 4 FT WATER WELLS DPR 10 FT Pemarks jPS COORDINATES LAT 60,071291 LONG -151.637078 I li,KE: SENT TO ACS KS, .HEA HOMER �U N ISI � I i i i L w i I u I I i r 1 W N% N% 1 NN Nw N% N% Nu NHINk L ulx i d3 $ dd iu d! P, A! du d'id i u' N I . I I I i O \ I ' � I IjI I Q L. W Q i F - W f— cl O I J i z I W I s I i I I � x H z z Q (n H H In z z z z Q rQ J J Uicn CL Y. I Ca 1 �j 2< I I I . I O ' � I I Q W i F - Q I J i I W I s I i I I � x z z z Q H In z z z z J J CL lJ W ulul I__ In IF 2< Davies, Stephen F (DOA) From: Cody Dinger <cdinger@hilcorp.com> Sent: Wednesday, July 12, 2017 9:47 AM To: Davies, Stephen F (DOA); Quick, Michael J (DOA) Cc: Paul Mazzolini Subject: Pearl 4 Locates (Shallow Hazard) (PTD# 217-094) Attachments: Hilcorp Locates for Pearl 4,5,7.pdf; Pearl 4 Locate Photos.docx; Enstar Locates for Pearl 2,4,5,7.pdf Steve, Per Permit to Drill Condition of Approval: "Photos and documentation from utility locates that demonstrate successful clearance of the drill site must be provided to the AOGCC prior to spudding of Pearl 4" Please find the attached documentation for Pearl 4 locates. Give me a call if you have any questions. Thanks, Cody Dinger 509-768-8196 THE STATE °fALASKA GOVERNOR BILL WALKER Paul Mazzolini Drilling Manager Hilcorp Alaska LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: Exploratory Field, Exploratory Pool, Pearl 2 Hilcorp Alaska LLC Permit to Drill Number: 217-102 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Surface Location: 1654' FSL, 196' FWL, Sec. 13, TIS, R14W, SM, AK Bottomhole Location: 1654' FSL. 196' FWL, Sec. 13. TIS. R14W. SM. AK Dear Mr. Mazzolini: Enclosed is the approved application for permit to drill the above referenced stratigraphic Test well. Hilcorp Alaska, LLC requests the following variances: 1. Hilcorp's request to waive wellbore surveys is APPROVED. The well depth is very shallow (600 ft) and intent is to drill vertically. 2. Hilcorp's request to use standard water well drilling equipment that is commonly used in the area is APPROVED under 20 AAC 25.037. The drilling rig will also use air instead of drilling mud to remove cuttings which is also common. Due to shallow depth and nature of the area conventional well control equipment is not needed or practical. Rig will use a rotating head and large hose to direct returns to a tank. 3. Use of a diverter is WAIVED due to the shallow depth of the wellbore. As stated above a rotating head system will be used as an alternate method of directing returns safely during drilling operations. 4. Requirement under 20 AAC 25.120 to place a well abandonment marker on the casing stub is WAIVED. 5. Hilcorp's request to use grout instead of cement to P & A wells is APPROVED. Grout is commonly used to abandon water wells. Additional Conditions of Approval: 1) Portable gas detection monitor (LEL) to be used on site. (minimum of 2 meters) 2) Well may not be drilled any deeper than 600ft without written approval from the AOGCC. 3) Photo document P&A operations: including casing cutoff, grout top and site clearance. PTD No: 217-102 July 13, 2017 Page 2 of 2 All dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by Hilcorp in the attached application, the following well logs are also required for this well: Lithology log required in lieu of mud log. Photos and documentation from utility locates that demonstrate successful clearance of the drill site must be provided to the AOGCC prior to spudding of Pearl 2. Written proof of extension of operator's permit from Kenai Peninsula Borough must be received prior to spudding of Pearl 2. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the AOGCC's internal use. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair DATED thisi 3 day of July, 2017. STATE OF ALASKA AL, . -,(A OIL AND GAS CONSERVATION COMM'. ON PERMIT TO DRILL fr711eY_CWFYr71Tc1 1 a. Type of Work: 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1 c. Specify if well is proposed for: Drill 121. Lateral ❑ Stratigraphic Test 121 ' Development -Oil ❑ Service - Winj ❑ Single Zone ❑ Coalbed Gas ❑ Gas Hydrates ❑ RedrilI❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service -Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket 2]. Single Well ❑ 11. Well Name and Number: Hilcorp Alaska, LLC Bond No. 022035244 • Pearl 2 ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 MO 600' • TVD: 600' • N/A 4a. Location of Well (Governmental Section): Surface: 1654' FSL, 196' FWL, Sec 13, T1 S, R14W, SM, AK 7. Property Drre��s��ig��nat n: � /�%'r8 /u-' / '7. // /.7 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: Kenai Peninsula Borough 6/28/2017 9. Acres in Property: 14. Distance to Nearest Propertv: Total Depth: 1654' FSL, 196' FWL, Sec 13, T1 S, R14W, SM, AK N/A Platted KPB ROW 30' FSL, 40' FWL 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 127.3 15. Distance to Nearest Well Open Surface: x-204,176.06' ' y- 2,227,698.98'. Zone -4 GL / BF Elevation above MSL (ft): 123.3 to Same Pool: N/A 16. Deviated wells: Kickoff depth: N/A feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: N/A degrees Downhole: 0-15 Surface: 0 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling I Length 1 MD TVD MD TVD (including stage data) 6.. 6 5/8" 17 A-53 Weld 150' 1 Surface Surface 150' 150' 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (fl): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes ❑ No ❑Q 20. Attachments: Property Plat ❑, BOP Sketch ❑ Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis❑ Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑ 20 AAC 25.050 requirements❑ 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Paul Mazzolini Authorized Name: Paul Mazzolini Contact Email: mazzolini hllCor .0 m Authorized Title: Drilling Manager Contact Phone: 777-8369 �ol,tj \ / Authorized Signature: Date:67/16 /2,017 Commission Use Only Permit to Drill �7 24 API Number: Permit Approval "7��3-1�'( See cover letter for other Number: /'-�C2- 50-��3-ZG�u%Z-e2� -e Date: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed thane, gas hydrates, or gas contained -in shales: Other: SwtTC Samples req'd: Yes; No❑/ ,�/ Mud log req'd: Yes❑ NoLy , RJsrs H�-- LE1R ���- HzS measures: Yes ❑ Not/ Directional svy req'd: Yes[] No[jr /�rt 1AN01TT+DI-9 S DNPPZ D JftL_ Spacing exception req'd: Yes ❑ NoF?( Inclination -only svy req'd: Yes[_] No�/ Post initial injection MIT req'd: Yes❑ NoD �i fl v�eu�,r k u/rr_d' ✓J ✓ APPROVED BY q I, .� I t I "( Approved by: COMMISSIONER THE COMMISSION Date: \+,1I1 %1f /r -1 71" 7 M 1 a ,�7 /�%� -713, / { r Submit Form Form 1110-401 Revised 5/2017 5 t s d 4 months 1 O 1 \ 1 11 Y /"l ( (D� 6 (AAAJ�1* �Aqr from the date of approval per 20 AAC 25.005(g) and Attachments in Du licate H Hilmrp Alaska, LLC 07/10/2017 Paul Mazzolini Drilling Manager Commissioner Alaska Oil & Gas Conservation Commission 333 W. 7'h Avenue Anchorage, Alaska 99501 Re: Kenai Peninsula Shallow Stratigraphic Test Well Program Pearl 2 Dear Commissioner, Hilcorp Alaska, LLC P.O. Box 244027 Anchorage, AK 99524-4027 Tel 907 777 8369 Email pmazzolini@hilcorp.com RECEIVED JUL 1 1 2017 Enclosed for review and approval is the Permit to Drill for the Pearl 2 shallow stratigraphic test well located near Ninilchik, AK. Pearl 2 is one of 16 - 20 shallow vertical stratigraphic test wells to be drilled and evaluated in the area between Ninilchik and Anchor Point on the southern Kenai Peninsula. The plan is to begin drilling operations during the week of July 17, 2017. The goal of the shallow stratigraphic test well program is to penetrate 1-3 shallow coal seams and evaluate this shallow wellbore with gamma ray and resistivity logs. A dipmeter log could also be run if requested by Geology to aid in the evaluation of the stratigraphic test well. Hilcorp will utilize a very experienced water well contractor on the Kenai Peninsula that will utilize best practices for the drilling of the shallow stratigraphic test wells. Hilcorp Alaska, LLC requests a variance from 20 AAC 25.035 (d) for utilizing diverter while drilling the shallow wells required for the stratigraphic test well program. The basis for this variance is information gathered by Hilcorp Sr. Geologist, David Buthman containing the shallowest gas shows and well test information from offset wells in the three areas to be targeted by the stratigraphic well test program. Hilcorp Alaska, LLC also requests a variance from 20 AAC 25.050 for obtaining wellbore surveys due to the very — shallow wells being drilled for the stratigraphic test program. \A sign will be posted at each drilling location with th well information required by AOGCC. IRV,✓Y<� The shallow stratigraphic test wells will be drilled with air and the cuttings will be captured in a tank as per AAC 20 25.047. Samples of these cuttings will be obtained every 30' for analysis. The cuttings will be sent to Kenai Gas Field for disposal at G&I or to the Kenai Peninsula Borough landfill (authorization to do so has been obtained). Once drilled and evaluated the wells will be plugged utilizing grout and cut off 10' below GL to complete the P&A. It is possible that some of the landowners may want to complete wells as a water source, in which case 20 AAC 25.140 requirements will be followed. Approvals from surface landowners have been obtained prior to surveying, staking and preparation of the site for each stratigraphic test well. These approvals are included as an attachment with each PTD application. Care has been taken to place drilling locations near access roads and to minimize location site preparation by utilizing a 35' x 70' footprint. If you have any questions, please don't hesitate to contact me at 777-8369 (office) or 317-1275 (mobile). Sincerely, CQ ZMazzolini Drilling Manager Hilcorp Alaska, LLC Page 1 of 1 Location Ninilchik PROPOSED Well Pearl PTD: TBD Hilco.p Alaslce, LLC WELLBORE API: TBD 6-5/8" 6" Hole TD = 600' / TVD = 600' Casing Detail Size Type Wt Grade Conn. ID Top Btm 6-5/8" Surf Csg 17 A-53 Weld 6" Surf 150' Drilling Info Updated by CJD 06/9/2017 Hole Section Casing 6-5/8" 6" x OH Updated by CJD 06/9/2017 Shallow Stratigraphic Test Well Plan Pearl 2 1. MIRU truck mounted drilling unit with support equipment onto 35'x 70' location. 2. Drive 6 5/8" casing through upper 100'-150' due to unstable hole conditions 3. Drill 6" vertical hole until one of 3 distinct coal seams is penetrated 500'- 600'. Base case is to air drill hole to TD. a. Samples to be gathered every 30' for geological review. b. A lithology log will be generated. ✓ 4. Once 6" hole drilled to TD, fill with freshwater or viscosified water to keep hole full for logging, approx. 21 bbls for gauge hole to 600' (.035 bbl/ft). 5. Remove cuttings from cuttings tank and haul to G&I in Kenai Gas Field for disposal or to Kenai Borough Landfill. (21 bbls /hole) 6. RDMO truck mounted drilling unit and support equipment. Move to next strat test well location. 7. Rig up logging unit and log 6" hole with Gamma / Resistivity. Geologist may request a dipmeter be run. 8. Rig down logging unit and move to next strat well. 9. MIRU truck mounted drilling unit with support equipment. 10. RIH with tubing and spot grout / bentonite plug from TD to surface. 11. Set surface grout / bentonite plug within 10' of surface, cut and remove 10' of 6 5/8" casing. Fill in hole. No welded cap on 6 5/8" casing as per waiver from AOGCC. 12. RDMO truck mounted drilling unit and support equipment. 13. No welded cap is required on 6-5/8" surface casing per waiver from AOGCC. 14. Portable gas detectors will be placed at the Drillers console and at the cuttings tank. 15. A lithology log will be generated and submitted to the AOGCC. Stratigraphic Test Well Program Project Description The Hilcorp Alaska, LLC stratigraphic test well program will be performed from June -December of 2017, and possibly into Q1 of 2018 depending on the ability to build packed snow and ice roads into the locations located in swampy areas. Hilcorp anticipates drilling 16-20 stratigraphic test wells, each up to 600' deep that will be drilled and evaluated on the southern end of the Kenai Peninsula between Ninilchik and Anchor Point. The areas have been named Seaview (near Anchor Point), Pearl (near Ninilchik) and Deep Creek (for the inland locations about 5 miles south of the Happy Valley gas field). These stratigraphic test wells intend to penetrate 1-3 shallow coal seams within 500'-600' from surface. Once these coal seams have been penetrated each stratigraphic hole will be filled with freshwater and logged with gamma ray and resistivity tools on a single run. Hilcorp geologists may determine that a dipmeter log also be obtained in some of the stratigraphic test wells. The chosen contractor is very experienced in drilling wells within this shallow hole section on the Kenai Peninsula and will use air drilling to drill the stratigraphic test wells to depth. Best practices will be utilized to drill and abandon these shallow stratigraphic test wells. Casing will be required in the top 100'— 150' of hole due to formation instability issues and will be drilled into place. The cuttings generated from the air drilling operations will be captured in a tank and samples will be obtained approximately every 30'. These cuttings will be hauled to the G&I Facility in the Kenai Gas Field for disposal or taken to the Kenai Peninsula Borough landfill. After each test well has been evaluated, it will be plugged with grout/bentonite mixture as required to meet regulatory requirements. Once a grout plug has been set to within 10' of surface, the casing will be cut off and the hole buried to complete the P&A of each stratigraphic test well. Once all drilling and data evaluation work has been completed, all locations will be cleaned up to the individual land owners satisfaction. Permission will be obtained from each land owner for all activities on their property to include surveying, site preparation, drilling activities, and data collection/evaluation of each stratigraphic test well. The stratigraphic test well locations were chosen to minimize impact to the surface owners. The area required for each stratigraphic test well is approximately 35' x 70'. Should soil conditions require, rig mats will be set in place to provide the drill rig unit and support equipment a firm and stable work surface. The locations have been placed near established roads and right of ways to minimize the length of any additionally needed access roads. Four locations in the Deep Creek area will require packed snow and ice roads to access swampy areas so that drilling and evaluation, work will be completed in Q4 2017 or Q1 2018, once the ground has sufficiently frozen. Work for the Q4 2017 / Q1 2018 stratigraphic test wells will be completed in the same manner as those drilled and evaluated during the summer. CONFIDENTIAL 8 May 2017 Alaska Oil and Gas Commission ATTN: Steve Davies Hilcorp Alaska, LLC ATTN: Paul Mazzolini RE: Shallow Stratigraphic Test Well Program Geologic Hazard Analysis Hilcorp Alaska, LLC has analyzed nearby oil and gas test wells, water wells, nearby gas producing wells, and seismic data on the southern Kenai Peninsula and do not anticipate any shallow gas at depths between 500' and 850' for the Stratigraphic Test Well Program. Therefore a waiver is requested for utilizing a diverter that is typical on deeper drilling oil and gas operations. The information that follows was utilized to determine the need for the diverter to drill the shallow stratigraphic test wells. Hilcorp Alaska, LLC is planning on drilling shallow stratigraphic test wells in three areas: Ninilchik, Deep Creek Unit, and Anchor Point. For each of these areas, geotechnical evidence indicates no shallow hazards. M. Guhl 10/29/2019 HALLIBURTON TOOL STRING DIAGRAM : GTET-XRMI-ACRT Description Overbody Description O.D. Diagram Sensors @ Delays Length Accumulated Length 60.06 ft 0 2.310 in Fishing Neck @ 59.18 ft RWCH.12345678 03.625 in _� 6.25 ft 135.00 lbs E�-Load Cell @ 56.38 ft F- BH Temperature @ 55.81 ft Weak Point 10000 lbs- 12345678 0 0.010 in' 0.01 lbs 53.81 it F- 2-Accelerometer@53.36ft GTET-12345678 03.625 in P 8.52 It 165.0016. (-_ GammaRay@47.75ft 45.29 ft SP Ring-12345678 0.00 lbs 03.625 in' (- SP @ 186 ft 0.58 ft Cabbage Head- 0 3.625 in 12345678 0 5.000 in O.Se, it 10.00 lbs 0.00 ft Serial Weight Length ACL ngtthhted MSp MnemonicTool Name Number (Ibs) (ft) ed (try (fpm) RWCH Releasable Wireline Cable Head 12345678 135.00 6.25 53.81 300.00 WP101K Weak Point 10000 lbs 12345678 0.01 0.01 54.61 300.00 GTET Gamma Telemetry Tool 12345678 165.00 8.52 45.29 60.00 XRMI XRMI Navigation - Insite 12345678 290.00 14.30 30.99 30.00 XRMI-I XRMI Imager- Insite 12345678 206.00 11.16 19.83 30.00 AGRI Array Compensated True Resistivity Instrument Section 12345678 50.00 5.03 14.80 120.00 ACRt Army Compensated True Resistivity Sonde Section 12345678 200.00 14.22 0.58 120.00 SP SP Ring 12345678 0.00 0.25 1.86 300.00 RSOF Regal Standoff 5.75in 11111111 20.00 0.52 10.86 300.00 CBHD Cabbage Head 12345678 10.00 0.58 0.00 300.00 Total 1,076.01 60.06 ' Not included in Total Length and Length Accumulation. Data: GTET-XRMI-ACRT Date: 03-May-1717:02:12 HALURURTUN TOOL STRING DIAGRAM : GTET-XRMI Description Overbody Description O.D. Diagram Sensors @ Delays Length Accumulated Length 40.56 ft 02.310 in 0 0I- Fishing Neck @ 39.68 it RWC14-12345678 0 3.625 In -� 6.25 fi 135.00 lbs Lead Cell @ 36.88 ft F._ 6H Temperature 36.31 ft Weak Point 10000 the. 12345678 00.010 In' 0.01 lbs 34 31 n Z-Accelerometer@33.86ft GTET-12345678 03.625 in -► 8.52 It 165.00 lbs F GammaRay@28.25ft 25.79 ft XRMI-I Instrument - 12345678 04.500 in 14.30 ft 290.00 lbs 11.49 ft 0 5.000 in XRMI-I Mandrel- 12345678 04.500 In 11.16 ft 206.00 Ibis Pads 2, 4, 6@ 3.10 ft Pads 1,3,5@2.87ft 11.33 ft Bull Nose -12345678 02.760 In _� 0.33tt 5.00 Ibs 0.00 ft Serial Weight Length Accumulated q. MSpeedo MnamenieTool Name Number (lbs) (ft( (ft) (fpm) RWCH Releasable Wireline Cable Head 12345678 135.00 6.25 34.31 300.00 WP10K Weak Point 10000 lbs 12345678 0.01 0.01 36.11 300.00 GTET Gamma Telemetry Tool 12345678 165.00 8.52 25.79 60.00 XRMI XRMI Navigation - Itlsite 12345678 200.00 14.30 11.49 30.00 XRMI-I XRMI Imager - Insite 12345678 206.00 11.16 0.33 30.00 Bli Bull Nose 12345678 5.00 0.33 0.00 300.00 Total 801.01 40.56 Not included in Total Length and Length Accumulation. Data: GTET-XRMI Date: 03 -May -17 16:18:07 35' Shallow Strat Well Drilling Site Plan Drill Cuttings Tank —20'x8'x6' Pipe Truck - 32'x8' 35,000 lbs Drill Rig - 40'x8' 62,000 lbs 70' S -STAKED NOTES: 1. COORDINATES SHOWN ARE BASED UPON DIFFERENTIALLY CORRECTED GPS OBSERVATIONS. 2. AS—STAKED SURVEY CONDUCTED MARCH 15, 2017. 3, ALL DISTANCES ARE IN U.S. SURVEY FEET. 4. SURVEYED NAVD88 (G12) GROUND ELEVATION OF PEARL 2 = 123.3' ' LEGEND: 0 SET BRASS CAP MONUMENT ON 5/8" X 30" REBAR AS—STAKED PEARL 2: LOCATED WITHIN SECTION 13, T1S, R14W, SM, AK SPCS NAD27 AK Z4N: LAT= 60'05'16.64749"N North LONG= 151'37'13.48286'W N= 2,227,698.98' E= 204,176.06' SPCS NAD83 AK Z4N: LAT= 60'05'14.49942"N LONG= 151'37'21.43554"W N= 2,227,457.62' E= 1,344,195.67' 0 250 500 FEET I I SCALE Sol VICINITY .�►_:ter VICINITY MAP: 1" = 1 Mile / d LEONARD CATLEDGE SUED. TRACT C f LEONARD CATLEDGE S SUED. TRACT B LOT 7 LOT 6 LOT 5 LEONARD CATLEDGE SUBD.- o W1LS0N 1977 SUED. TRACT -A TRACT 1 2 LOT 4 /LOT 12/ lLOT 12 OPEARL TRACT 131(3 LOT 8 LOT 9 LOT 10 LOT 11 LOT 12 q0 3 c>� 2 c� 2 Qy M_ UNSUBDI FADED C9 7 U U OF. q/ ��� SURVEYOR'S CERTIFICATE: i Q�� ' • • �jp��tS� I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE co.ylT �9 �� EXHIBIT REPRESENTS A SURVEY MADE LAND SURVEYING IN THE STATE OFL BYK ME OR UNDER MY DIRECT AS -STAKED * AND THAT THIS 49 H ///���VVV * �/� SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE "' • • -' • ri;; 'i'" " / BEST OF MY KNOWLEDGE. y:•MICHAELR.EWIgG •'e 1� LS -11794 i ,1�9F�pRofasIONAI.�P��z r lh, RECON, LLC RUCON��.✓.✓����481 W. RECON CIR. PALMER, AK 99645 1 OF 1 1 REV: 0 Davies, Stephen F (DOA) From: Painter, Jed <1Painter@kpb.us> Sent: Thursday, July 13, 2017 2:19 PM To: dduffy@hilcorp.com Cc: Davies, Stephen F (DOA) Subject: Permit 035P Attachments: D00071317-07132017141303.pdf David, Your attached permit was extended until July 31, 2017. Thanks, Jed Road Service Area b 47140 E. Poppy Lane • Soldoina,Alaska 99669 (907) 262-4427 office, (907) 262.6090 fax www.borough. kenal.ak.us/roads MIKE NAVARRE BOROUGH MAYOR R.O.W. PERMIT - PROJECT SPECIFIC 'This permit Is to be completed by the RSA Director' ❑Road Construction ®Other: Drilling project — data gathering Category of Road: NIA Width NIA Length NIA Road Names: Randi's Rd Region/Unit: West 4 Applicant Name: Hlllcorp Alaska LLC Contractor: Krakberger Drilling Inspector Name: Jed Painter RSA Phone If 262-4427 I lisl4flQuIred to call the I s actor for a minimum of 51n ections: For all Road Construction -181 asLthefirst ng pfac -2n° wIIR (less than 12 Inchesdeep cted.•3'd wft Is being compacted. •4'h foialcom I esu t in a punch IIs1 of Items to complete-5'hon Nola •As required by KPB uctlon Standards: - hair oft n shall meet or exceed II curre andards. Exce Vons mu be Pre -a roved Board or RSA Director and not d on -Due to sol complexities the RSA recommends permit enlist a;ensed road rxmslructbn contractor arxUor engineer. •II is the applipnl's responsibility to determine the acquue tical, stale, or federal permits and to ensure all coaslrucUon activity complies with all lederel s aws. -Il is the appli si ility to survey the proposed Right-ot-Way for constmch'n and propedy Iota sed road and all utilities in o -Way. RSA Special Provisions: Applicant proposes to place a drill rig near the westerly terminus of Randi's Road for the purpose of gathering data. Project is temporary, planned to span a 5 -day period between 6.15 and 6.20, 2017. Schedule may be adjusted as necessary, but in any case will adhere to project specifications cited in attached application. RSA Special Provisions: Contact Road Inspector prior to start of work. 1. Drill outside of road prism if possible. 2. If drilling through road prism cannot be avoided make road repairs before leaving site. 3. Coordinate with local residents affected to ensure adequate access during times of necessary road closure. Approved: ® Denied: ❑ Revoked: ❑ 5X7;rNp 70 7I 7 Permit q 11-035e Permit Issue Date: 5.4-17 Permit Expires: 7.1.17 By RSA Director/ Date: 5.4.17 ` 7— A �7) Dale approved by RSA Board (If required): N/A Regulation of Tralfic Flow During Construction: Permit holder may regulate traffic by(signagerregulatory device/barricade) during hours of: As required during daylight hours from (date) 6.15.17 to (date) 6.20.17 J Davies, Stephen F (DOA) From: David Duffy <dduffy@hilcorp.com> Sent: Thursday, July 13, 2017 11:14 AM To: 'Painter, Jed' Cc: Cody Dinger; Davies, Stephen F (DOA); Cody Terrell; Kevin Tabler Subject: FW: Hilcorp Permit 17-035P, request to extend Jed, Thanks for your verbal approval to extend our KPB permits to accomplish our drilling program this summer. When you get a chance, please forward an email confirmation to me, with a CC to Steve Davies at the AOGCC regarding extension Hilcorp's permits to drill within KPB ROWS at Our Lane (Pearl 4) and Randis Road (Pearl 2). Much appreciated, David Duffy, Landman Hilcorp Alaska, LLC Direct: 907-777-8414 Cell: 907-301-2629 dduffy@hilcorp.com This email may contain confidential and / or privileged information and is intended for the recipient(s) only. In the event you receive this message in error, please notify me and delete the message. From: Cody Dinger Sent: Thursday, July 13, 2017 8:43 AM To: David Duffy <dduffy@ hilcorp.com>; 'Painter, Jed' <jpainter@kpb.us> Cc: Cody Terrell <cterrell@hilcorp.com>; Keegan Fleming - (C) <kfleming@hilcorp.com>; Paul Mazzolini <pmazzolini@hilcorp.com> Subject: Re: Hilcorp Permit 17-035P, request to extend FYI for all - Spoke with Jed this morning and he verbally approved permission to proceed on "Pearl 4" - Our Lane road. Thanks for the time this morning Jed and maybe we'll see you tomorrow. Cody Dinger 509-768-8196 Get Outlook for iOS Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Wednesday, July 12, 2017 9:09 AM To: Cody Terrell Cc: Paul Mazzolini; David Duffy; Kevin Tabler Subject: RE: Pearl 2 (PTD #217-102) - Questions Thank you Cody. Please provide documentation of the permit extension before Pearl 2 spuds. Thanks again, Steve Davies AOGCC CONFIDENTIALITY NOTICE; This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.Rov. From: Cody Terrell [mailto:cterrell@hilcorp.com] Sent: Tuesday, July 11, 2017 10:04 PM To: Davies, Stephen F (DOA) <steve.davies@alaska.gov> Cc: Paul Mazzolini <pmazzolini@hilcorp.com>; David Duffy <dduffy@hilcorp.com>; Kevin Tabler <ktabler@hilcorp.com> Subject: RE: Pearl 2 (PTD #217-102) - Questions Steve, The Pearl 2 strat test well is located on a KPB ROW at the end of Randis Road as you previously stated. The application had a typo and should have indicated this as being KPB ROW property. Attached is Hilcorp's right to access and drill the strat test well on this location. We are currently in contact with KPB to extend the permit since the prq]ect is taking a little longer than anticipated. I will provide you with documentation orpermit extension as soon as we hear back from the borough. Regards, Cody T. Terrell Landman Hilcorp Alaska, LLC Direct: 907-777-8432 Cell: 713-870-4532 From: Davies, Stephen F (DOA)[mailto:steve.davies@alaska.gov) Sent: Tuesday, July 11, 2017 3:05 PM To: Cody Terrell <cterrell@hilcorp.com> Cc: Paul Mazzolini <pmazzolini@hilcorp.com> Subject: Pearl 2 (PTD #217-102) - Questions Cody, The Property Designation box (Box 7) on Hilcorp's Permit to Drill application for Pearl 2 indicates the property affected by this well is "Private Fee' land, but on the Kenai Peninsula Borough (KPB) Parcel Viewer and on the surveyor's As - Staked plat, the well location appears to lie within an area""h�arked as a cul-de-sac at the end of Randis Road. Is the location, below, correct? If so, does this location within the 11 -de -sac lie on private land or within KPB Right -of - Way? Please provide proof that Hilcorp has been granted the right to drill Pearl 2 by the affected property owner. Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.eov. Road Service Area $ 50L 47140 E. Poppy Lane • Soldotna, Alaska 99669 (907) 262-4427 office, (907) 262-6090 fax www.borough.kenai.ak.us/roads MIKE NAVARRE BOROUGH MAYOR R.O.W. PERMIT - PROJECT SPECIFIC 'This permit is to be completed by the RSA Director' ❑Road Construction ®Other: Drilling Droiect - data gathering Category of Road: N/A Width N/A Length N/A Road Names: Randi's Rd Region/Unit: West 4 Applicant Name: Hillcorp Alaska LLC Contractor: Krakberger Drilling Inspector Name: Jed Painter RSA Phone # 262-4427 The wired to call the Inspector for a minimum of 5 inspections: For all Road Construction -1" as fabric being placed -2n° when the first lift (less than 12 inches deep i acted. 3^' when next lift is being compacted. -4U for substantial com I u in a punch list of Nems to complete 5'" ion •NWe -As required by KPB tion Standards: -Road Construction shall meet or exceed all curer tandards. Exce tions must be Prey roved Board or RSA Director and noted on -Due to soil complexities the RSA recommends perms His icensed road construction contractor and/or engineer. -II is the applicant's responsibility to determine the acgmr local, state, or federal permits and to ensure all construction activity complies with all federal s ws. -It is the a si lity to survey the proposed Rightof-Way for construction and properly I ed road and all utilities in o -Way. RSA Special Provisions: Applicant proposes to place a drill rig near the westerly terminus of Rands s Road for the purpose of gathering data. Project is temporary, planned to span a 5 -day period between 6.15 and 6.20, 2017. Schedule may be adjusted as necessary, but in any case will adhere to project specifications cited in attached application. RSA Special Provisions: Contact Road Inspector prior to start of work. 1. Drill outside of road prism if possibie. 2. If drilling through road Prism cannot be avoided, make road repairs before leaving site. 3. Coordinate with local residents affected to ensure adequate access during times of necessary road closure. Approved: ® Denied: ❑ Revoked: ❑ Permit # (1 —L? 3'5 P Permit Issue Date: 5-4-17 Permit Expires: 7-1-17 By RSA Director. — Date: 5-4-17 Date approved by RSA Board (if required): WA Regulation of Traffic Flow During Construction: Permit holder may regulate traffic by (signage/ regulatory device/ barricade) during hours of: As required during daylight hours from (date) 6.15-17 to (date) 6-20.17 �l KENAI PENINSULA BOROUGH APR 2 6 1011 4 Road Service Area P 47140 E. Poppy Lane o Soldotna, Alaska 99669 Road Service Area Toll -tree within the Borough: 1-800-478-4427 PHONE: (907) 262-4427 • FAX: (907) 262-6090 www.kpb.us PROJECT SPECIFIC RIGHT-OF-WAY (ROW) CONSTRUCTION PERMIT APPLICATION Road Construction Project Other (Excluding Dn a ays) Please List: alrategraphic (i.e., geologic) lest well, temporary use Existing Road Upgrade New Road Construction Road Construction Not 'Alternate Design ❑'Engineered Design ❑"Category IV Rd to KPB 14.06 Standards (These require prior RSA board approval before construction) It is the applicant's responsibility to determine the need for any other local, state or federal permits and acquire the same. Similarly, it is the applicant's responsibility to ensure all construction activity complies with all Federal, State, and Local laws. APPLICANT NAME. Hilcorp Alaska, LLC APPLICANT MAILING ADDRESS: 3800 Centerpoint Drive, Suite 1400 CITY:Anchorage p TELEPHONE: 907-777-8414 CELL: CONTRACTOR NAME: Kraxberger Drilling ROAD NAME:Randi's Road dduffy@hilcorp.com STATE: AK ZIP: 99503 FAX: 907-777-8580 Leonard Catledge Subdivision (Determined by RSA) W 4 APPROXIMATE START DATE: 6/15/17 APPROXIMATE COMPLETION DATE: 6/20/17 Project is planned to last —5 days beginning as June 15, schedule may be adjusted as needed. Revised 9nlaO16 Pape t of 4 REQUIRED ATTACHMENTS: 7 Attachment A (page 4) Preliminary Plat or Final Plat 'Map OTHER ATTACHMENTS: (dapplcabe) ❑Engineering Design ❑Other Government Agency Applications/Permits F]As-Built Survey Where information provided by existing topographic maps, aerial photography, and photographs is inadequate to accurately reflect conditions of the right-of-way or potential problems created or exacerbated by construction, additional information, surveys, or engineering analysis may be required prior to issuance of a permit. TRAFFIC FLOW: Applicant may request authority to regulate traffic: / Yes ❑ No during the following hours of the day on the following dates: June 15 -June 20, day jght hours. Applicant shall provide signage and safeguards in accordance with the Alaska Traffic Manual and shall obtain any further permission for such routing from appropriate entities including but not limited to fire, emergency medical, police, and school transportation agencies. Road passage or alternate access must be maintained or provided to residents at all times. WATER BODIES: (KPB 14.40.061) All floodplain, floodways, wetlands, streams lakes, or other water bodies adjacent to or within 50 feet of the outer boundaries of the right-of-way must be clearly delineated on a map attached to application. Are water bodies as described above present within 50 feet of right-of- way? Yes 0✓ No. Development conditions for rights-of-way accessing water bodies. No development within 100 feet of the high water mark of a waterbody within a right-of-way providing access to the waterbody may occur without a permit. All permits issued under this section shall be submitted to the RSA Board for its consideration. If applicable, date and Resolution No. of RSA Board approval Right-of-way construction permits pursuant to KPB 14.40.040-14.40.060 will not be issued to construct any part of a road or driveway or other development within the right-of-way where the construction or development will be parallel and within 100 feet of the ordinary high water mark of a watercourse or lake unless necessary for access to a lot where no reasonable alternative access exists or unless the road is for access to a bridge or public facility, waterbody, or watercourse. Construction will awill not occur within 100 feet of the ordinary high water mark of a watercourse. Pursuant to KPB 14.40.040-14.40.060 for waterbody crossings where a dedication crosses a waterbody catalogued as important to the protection of anadromous fish under AS 41.14.870(a) as now enacted or hereinafter amended, applicants must provide completed application for project permits to the United States Army Corps of Engineers and Revised 9/21/2016 Pape 2 014 Alaska Department of Fish and Game Division of Habitat. Anadromous waterbody crossings must be designed by a licensed civil engineer and submitted to the RSA Board for review and approval prior to construction. Designs must comply with KPB 14.40.061 requirements. P US Army Corp of Engineers Project Permit No. Issued on AK Dept. of Fish & Game Permit No. Issued on Construction does not cross dedicated catalogued waterbody as described above. THE KENAI PENINSULA BOROUGH SPECIFICALLY DISCLAIMS ANY WARRANTY OR LIABILITY REGARDING LOCATION OR COORDINATION WITH UTILITY COMPANIES. Statement of Applicant: I hereby affirm and agree that the work necessary to bring the project described herein to applicable roads standards as described in KPB 14.06 will be, or has been completed, to follow all permit requirements contained herein, in KPB 14.40 and Attachment B "Mandatory Conditions". By signing this application I certify that all the with the Road Service Area (RSA). I further acknowledge and agree that any violation of a permit condition or failure to obtain a permit for work in a ROW is subject to a civil penalty of up to $300 pesr ursuant to KPB 14.40.380. of Date INDEMNIFICATION: By signing this application, I hereby acknowledge that the permittee shall indemnify, defend, and hold and save the borough, its elected and appointed officers, agents and employees harmless from any and all claims, demands, suits, or liability of any nature, kind or character including costs, expenses, and attorneys fees. The permittee shall be responsible under this clause for any and all legal actions or claims of any character arising from applicant or applicant's agents' performance or failure to perform this permit in any way whatsoever. This defense and indemnification responsibility includes claims alleging acts or omissions of the borough or its agents, which are said to have contributed to the losses, failure, viaW,4 ay , or damages. KPB 14.40.060. nt Pursuant to KPB 14.40.060(c), this permit may be subject to additional conditions to protect and manage borough ROWs by preventing damage to ROWs and adjacent public and private properties or waterbodies. This Permit may be revoked at any time for the Borough's convenience or for failure to comply with requirements herein, KPB code, or other applicable local, state, or federal law. Incomplete permit forms will be returned to applicants. Will Road Maintenance be requested? Yes [—,/]No If yes, a separate Road Maintenance Application must be submitted by September 1" for consideration that calendar year. Revlxd 9/112018 Peg. 3 d 4 RSA RIGHT-OF-WAY CONSTRUCTION PROJECT DESCRIIPTION ATTACHMENT A (Pursuant to KPB Chapter 14.40.050) PROJECT DESCRIPTION: (use extra pages if necessary) 1. Brief narrative of construction plans: Project is planned to last —5 days beginning as June 15 schedule may be adiusted as needed. 2. Proposed design and method of construction: N/A Site use will be temporary. 3. Statement of length and width of project and right-of-way to be constructed: N/A Site use will be temporary. 4. Approximate grade of natural terrain and final grade of proposed construction: N/A 5. Soil conditions of area subject to construction: Gravel road bed. 6. Identify all properties affected, served or accessed by the proposed construction, provide owner name and parcel numbers: KPB 1572308 (FJygenrig) has house accessed from end of Randi'c road Other parcels (KPB 157 309 151723007 and 1572310) are undeveloped See attached plat. 7. Brief narrative of construction plans: N/ASite use will be temporary, and no permanent modifications are planned, Site will b returned P turned torep drillina conditions immediately following drilling operations 8. Proposed uses after construction: N/A Site use will be temporary and no permanent modifications are planned. Site will be returned to are -drilling conditions immediately following drilling operations. Revkee W W016 Page 4 of 4 STAKED NOTES: 1. COORDINATES SHOWN ARE BASED UPON DIFFERENTIALLY CORRECTED GPS OBSERVATIONS, 2. AS -STAKED SURVEY CONDUCTED MARCH 15, 2017 3. ALL DISTANCES ARE IN U.S. SURVEY FEET. 4. SURVEYED NAVD88 (G12) GROUND ELEVATION OF PEARL 2 = 123.3' LEGEND: 0 SET BRASS CAP MONUMENT ON 5/8" X 30" REBAR AS -STAKED PEARL 2: LOCATED WITHIN SECTION 13, TIS, R14W, SM, AK SPCS NAD27 AK Z4N: LAT= 60'05'16.64749"N LONG= 151'37'13.48286"W N= 2,227,698.98' E- 204,176.06' SPCS NAD83 AK Z4N: LAT= 60'05'14.49942"N LONG= 151'37'21.43554"W N= 2,227,457.62' E= 1,344,195.67' 0 250 500 FEET SCALE *. 49 TH w •.* ...................... ... ry�yy LS 11794 ' MICHAEL R. EIMNG •� Q `'tl\�ROFESSgNPI�P�\� �- North i Tis 18 1 17 24 %---19 / 20 - i MBe SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -STAKED EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. R� j.��jj RECON. LLC 4 ' " O'..: 4811 W, RECON CIR. PALMER, AK 99645 SHEET: 1 LEONARD CATLEDGE SIDD. TRACT C LEONARD CATLEDGE SU6O. TRACT B LOT 7 LOT B LOT 5 LEONARD CATLEDGE SUED. o WILSON 1977 SUBD. TRACT -A TRACT 2 LOT 4 /LOT 12/ %LO 12 OPEARL / S /S R LOT 0 LOT B LOT NT LOT 11 LOT 12 - U S V J2 UNSUBDINDED y a n U U C SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -STAKED EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. R� j.��jj RECON. LLC 4 ' " O'..: 4811 W, RECON CIR. PALMER, AK 99645 SHEET: 1 Legend Kee sve l.d, ECOSYSTEM SOM �♦ -Troy � - t b.0 aTa Tnw ` -•r` �, a '� j�. � PadiKay OoYna Gas 6.t2w,OUH ro 5:'.r � I50' buffer 1. l•... i .<-; • ,, 100' buffer 1 ,A It. Strategraphic Well LUFSnla 11,5500 OJRu Sma Plana 4 RAD irQ.? paxl Rantli's Road N Proximity to Wetlands _ Page 3 of 3 IS Wed Apr 262001'7`700/ 1 7:47:11 AM _ KPB Parcel Viewer '"<� Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Tuesday, July 11, 2017 3:05 PM To: Cody Terrell Cc: Paul Mazzolini (pmazzolini@hilcorp.com) Subject: Pearl 2 (PTD #217-102) - Questions Cody, The Property Designation box (Box 7) on Hilcorp's Permit to Drill application for Pearl 2 indicates the property affected by this well is "Private Fee" land, but on the Kenai Peninsula Borough (KPB) Parcel Viewer and on the surveyor's As - Staked plat, the well location appears to lie within an area marked as a cul-de-sac at the end of Randis Road. Is the location, below, correct? If so, does this location within the cul-de-sac lie on private land or within KPB Right -of - Way? Please provide proof that Hilcorp has been granted the right to drill Pearl 2 by the affected property owner. Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.¢ov. wKenai Peninsula Borough Pa,rcei viewer Toolsp RID) Distarice Area Feet (Po � 4*1 p Find location by Address Find Street by Name Find Parcel by ID Find Parcel by p,.,ner io A Expor, Hero I M. Search... O CIO Point Polygon RID) Distarice Area Feet (Po Enabde 5oappng Select Snapping Acres (ac) Layers Q Sign in F3 OR Mark LaVLong Zoom to on Map Lat/Long X Clear Map Parcel Report Print +EI 4P Alaska Mapper - Map X + v — O X Settings and more -- Q .: v alaska.gov mar Per/rontroller?do=view&mew=mapKmap=16/- 162778 30 39(?,41 91 �= — LS r St4ftallAlaSka Alaska Meppw-WELTS Logout (Lagged in as Stephen F Davies) ter, Run Query Map Options - u cmr` r , i r : , i a. - - _ Pearl 2: Nearby Water WellsIt =_= -= WELTS: #221679•0" Depth: ExcavatedSpring =-_- ----= ----== -=- -- Pearl 2 LAS: #5013, WELTS#:14347 I Depth: 160''; 1,350' oho qKi. ___-_-__-= _-_-_____ WELTS:#21818 •_______-___-=-__-__-_-__-=________- Depth: Not Reported ( 2-17 -/DZ. Davies, Stephen F (DOA) Z From: David Buthman <dbuthman@hilcorp.com> 111 ,.1 17 Sent: Tuesday, May 30, 2017 4:33 PM To: Davies, Stephen F (DOA) Cc: Paul Mazzolini; Monte Mabry Subject: RE: Pearl 1 A Strat Test Well (PTD #219-079) Attachments: Shall owgeologichazards_AOGCC_Daviesfollowup.docx Hi Steve, Attached report addresses your issues, below. If you have additional questions or requests, don't hesitate to contact me. Rgds, Dave From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Friday, May 26, 2017 1:09 PM To: Paul Mazzolini <pmazzolini@hilcorp.com>; David Buthman <dbuthman@hilcorp.com> Subject: Pearl 1A Strat Test Well (PTD #219-079) Dave and Paul: I'm working through the Permit to Drill application for the Pearl 1A strat test well. Maybe I've missed something, but where does Pearl 1A lie with respect to seismic section UNO 01-10? Could Hilcorp please provide a copy of this seismic section with the Pearl 1A, 3, and 6 strat tests plotted to scale on it with respect to horizontal location along the line and vertical depth? Although section UNO 01-10 doesn't display strong amplitudes above about 1.0 seconds, located near the center of the section is a zone where the seismic signal clearly loses coherence. Several weakly continuous reflectors visible within this zone below about 1.0 second appear to sag downward. This area is reminiscent of gas chimneys that I have seen on other seismic surveys (an example from Google is shown below). Is this a gas chimney? If so, how far is it from the planned Pearl 1A, 3 and 6 strat test wells? If Pearl 1A, 3 and 6 are near this feature, what risk does it pose as a shallow drilling hazard. Could you please convert 1.0 seconds travel time to depth for me? <7_ 18 researchgatenet . 2-0 3.0 Top Balder; - Top Ekofisk E _ x_ Base chalk � :ter * aaY 4-0 Base Cret— aceous 4.5, 1I91�r1/93R `i 3krn Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. 2 30 May 2017 Alaska Oil and Gas Commission ATTN: Steve Davies Hilcorp Alaska, LLC ATTN: Paul Mazzolini RE: Follow Up Discussion Zl"7-ia2 ccow DD urrm Ile- 4 C Shallow Stratigraphic Test Well Program Geologic Hazard Analysis -Z 1��t5 -7 The report addresses issues in the 5/26/2017 email from Steve Davies of the AOGCC, requesting the following: 1. Seismic sections that pass through stratigraphic test wells Pearl 1A, 3, and 6 plotted to scale and vertical depth. Discussion below. 2. Discussion of seismic coherence on UNO 01-10: is this a gas chimney? Is it a drilling hazard? Discussion below. 3. Can you convert 1 seconds of travel time to depth? Depth converted seismic lines are included below. M. Guhl 10/29/2019 n R 2 Remark: AOGCC Permit to Drill 11 July 2017 INPUT Geographic, NAD27 Pearl 2 Latitude: 60 05 16.64749 Longitude: 151 37 13.4 8286 OUTPUT State Plane, NAD27 5004 -Alaska 4, U.S. Feet 1/1 NorthingN. 2227698.9E1 Easti n g/X: 204176.062 Convergence: -1 24 16.75296 Scale Factor: 0.999999595 Corpscon v6.0.1, U.S. Army Corps of Engineers FIELD: TRANSMITTAL LETTER CHECKLIST WELL NAME: 14_7' I PTD: Z1- 49 Z_ Development_Service _Exploratory /Stratigraphic Test _ Non -Conventional POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance -with AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50-_- from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occ r. / ,AX ditch sample sets submitted to the AOGCC must be in no greater i/ Dry Ditch Sample than 30' sample intervals.from below the pennaftest or frQm iv Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (COmnanV Name l must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be nm. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are Well Logging also required for this well: / l `n U 1� T l/4' Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Al Revised 2/2015i�Lc Cwt Sic S G(CCes 4� Ql�e_ l% J /y�7�v v2c%l445�' WELL PERMIT CHECKLIST Field & Pool _ _ _ Well Name: PEARL 2 Program STIR — _ Well bore seg ❑ PTD#:2171020 Company HILCORP ALASKA LLC Initial Class/Type STR / PE. lD GeoArea 820 Unit On/Off Shore D_n Annular Disposal ❑ Administration 117 Nonconven, gas conforms to AS31,05.0300A.A),0,2.A-D) _ _ ...... NA... '1 Permit. fee attached. _ _ _ _ _ _ _ _ NA 2 Lease number appropriate..... _ _ _ Yes _ _ 7/11: Requested proof.of authorization to drill from Hilcorp. 7/13: receive report of verbal extension of 3 Unique well. name and number _ _ _ _ _ .... Yes _ Hilcorp's permit. from Kenai Peninsula Borough to drill this well. SFD 4 Well located in. a_ defined_ pool _ _ _ _ _ _ _ No ... _ Well will be located within Kenai Peninsula Borough Right of Way. 5 Well located proper distance from drilling unit. boundary. _ _ _ _ Yes _ _ _ Pearl 2 will lie 3,5.00' SW of.P&A'd_exploratory welt Pearl. l.. Pearl will lie 1,350'from. the nearest _ 6 Well located proper distance from other wells _ _ _ _ _ _ _ Yes _ _ water well that is registered in DNR's Well Log Tracking System database. 7 Sufficient acreage available in drilling unit. _ _ _ _ _ Yes _ _ _ Very shallow (600' MD / ND), vertical strat test well to validate shallow geologic structure. 8 If. deviated, is. wellbore plat included ... _ _ _ _ _ NA _ _ _ _ Shallow well.will penetrate aquifers, only small amounts of methane gas expected. Impacted area will be 9 Operator only affected party....... _ _ _ _ _ _ Yes _ _ a 35' by 70' drill site. Well will. be located within Right of Way boundary. Nearest. 10 Operator has. appropriate_ bond in force _ _ _ _ .. _ _ _ _ _ Yes _ .... _ house or cabin appears to be.about 200' away... Appr Date 11 Permit can be issued without conservation order. _ ... Yes .. . . . . . . . . . .......... . _ _ _ 12 Permit. can be issued without administrative_ approval Yes ^-O 7/13/2017 _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. 13 Can permit be approved before 15 day wait ........ _ _ _ _ _ Yes .. 14 Well located within area and strata authorized by Injection Order# (put. 10# in comments), (For NA...... 15 All wells. within 1/4 mile area of review identified (For service well only) _ _ ... _ _ NA . . . . . . . ........ 16 Pre -produced injector; duration of pre production less than 3 months. (For service well. only) . _ NA_ 18 Conductor string. provided _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . _ _ . _ . _ 6-5/e'' conductor lobe driven to 150 ft Engineering 19 Surface casing_ protects all known USDWs .. _ . NA.... _ drilling HO to 6QO. ft..No,casing set. _ Will be filled with grout. to surface for P&A 20 CMT vol adequate to circulate on conductor. & surf csg . . . . . . . . . . .............NA.. _ . _ no surface casing. to be run, 21 CMT.vol adequate to tie-in long string to.surf csg. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA_ 22 CMT will cover all known productive horizons _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ NA _ . _ _ . _ At P&A, grout to be placed from depth to surface for abandonment 23 Casing designs adequate for C, T, B &_permafrost . . .. . . . . . . . . . . . ............NA..... _ _ _ No casing run. OH to 600 it for strat testing ........... _ 24 Adequate tankage. or reserve pit _ _ ... _ .......... NA.... _ _ _ Will use air to drill..Cuttings hauled to approved facility 25 Ifa.re-drill,has. a10-403 for abandonment been approved . . . . . ............... NA _ _ _ ..... 26 Adequate wellbore separation proposed _ _ _ _ _ _ _ _ _ _ NA. _ _ ... _ Vertical well No other wells in area X27 If diverter required, does it meet regulations_ ... _ _ _ _ _ NA .. _ _ _ _ _ Diverter waived: To be drilled with water well equipment... Appr Date !,28 Drilling Fluid program schematic & equip list adequate _ _ _ _ _ _ _ _ .. _ _ . _ NA _ _ _ _ _ Will use air drilling to bring cuttings to surface.. Samples every 30 ft MJQ 7/12/2017 29 BOPEs,.do they meet regulation ..... _ _ _ _ _ _ _ _ _ .... _ _ NA_ _ _ _ _ _ _ _ Consists of a roatating_head with, boey line for cuttings 30 BOPE press rating appropriate; test to (put psig in comments)...... _ _ _ _ _ _ _ _ NA_ ... 31 Choke manifold complies w/API. RP -53 (May 84).. 32 Work will occur without operation shutdown _ _ _ _ .. _ _ NA _ _ _ _ . Will drill well, fill wellbore with water and log with Eline,_then P&A well to surface_ 33 IS presence of 1-12S gas probable------------------------------------- No__......---------------._......---------..._._............-------._...._. 34 Mechanical_ condition of wells within AOR verified (For service well only) .. _ _ _ _ _ NA 35 Permit can be issued w/o hydrogen sulfide measures _ ... _ _ _ _ _ _ _ _ _ Yes ....... None expected based on Pearl l_ exploratory_ well,. located 3,500' NE .... . ..... . . . . . ....... . . . . . . . Geology 36 Data presented on potential overpressure zones ......... . . . . . . . . .... Yes _ _ _ _ _ None expected.. Pearl 1 exploratory well encountered, maximums of 1 unit (200. PPM) methane gas. Appr Date 37 Seismic. analysis of shallow gas _zones _____ _ _ _ _ _ _ _ .......... NA _ _ _ between surface and 855' MD/TVD, 3,units. (600 PPM). between 855' and 900' _MDrTVD), and 10 units_ SFD 7/11/2017 38 Seabed condition survey (if off -shore) .. . ........... . . _ _ _ ......... NA. _ _ _ _ _ _ (2,000 PPM) between 900' and 1000' MD/TVD. while drilling with 8.9ppg mud. Near surface sediments 39 Contact name/phone for weekly. progress reports [exploratory only] _ _ .......... Yes _ _ _ _ _ _ are not expected to contain laterally extensive, trapping seals, Contact: Paul Mazzolinl 777-8369 Geologic Date: Engineering Date Public Photos and documentation from utility locates that demonstrate successful clearance of the drill site and written proof of extension Commissioner: Commissioner: C i ' Date of H'Icorp's permit from Kenai Peninsula Borough must be provided to the AOGCC prior to spudding of Pearl 2. SFD 7-13-17 0 Ito