HomeMy WebLinkAbout217-113aid -(t3
a g�a�l
Davies, Stephen F (CED) a ��
From:
Davies, Stephen F (CED)
Sent:
Monday, December 16, 2019 9:03 AM
To:
Seth Nolan
Cc:
Guhl, Meredith D (DOA); Carlisle, Samantha J (CED)
Subject:
RE: Miss Labeled Electronic Dataset
Attachments:
TRANS MITTAL_2171130_Seaview-7_81ank_DVD_20191213.pdf
Hi Seth,
The DVD that Hilcorp provided on December 13" containing replacement digital well log data for Seaview 7 is blank. I
checked and confirmed this using two different PCs. Would you all please provide another DVD containing the Seaview
7 data? Attached is a copy of the transmittal letter that accompanied the blank DVD.
Thank you,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesCDalaska.gov.
From: Davies, Stephen F (CED)
Sent: Wednesday, December 11, 2019 9:52 AM
To: Seth Nolan <snolan@hilcorp.com>
Cc: Guhl, Meredith D (DOA) <meredith.guhl@alaska.gov>; Carlisle, Samantha J (CED) <samantha.carlisle@alaska.gov>
Subject: Miss Labeled Electronic Dataset
Seth,
While working through the data from Hilcorp's Seaview wells, I noticed that one set of data submitted for Seaview 7
(AOGCC e -Set No. T28836) actually contains the following data recorded in Seaview 6.
Name
Hilcorp_Alaska_Seaview_6_LAS.Ias
® Hilcorp Seaview_6 480ft_TD_2in Field Lithology_Log,pdf
1 Hilcorp Seaview_6 48Oft_TD_2in_Field Lithology_Log.tif
® Hilcorp Seaview 6 48Oft_TD_5in_Field_Lithology_Log,pdf
Lam: Hilcorp Seaview_6 480ft_TD_5in Field_LithoIogy_Log,tif
Date modified
Type
Size
9/21/2017 4:47 P M
LAS File
267
9,211-'2017 4:47 PM
Adobe Acrobat D...
224
9/25,12017 2:25 PM
TIF File
632
9/21:2'174:47 PM
Adobe Acrobat D.-
302
9/25/20172:25 PM
TIF File
661
I checked the Batas for Seaview 6 to see if the labels had inadvertently been switched, but no, the data shown above is
also included in the collection for Seaview 6 (T28835). I also checked all other datasets that were logged in at AOGCC at
about that same time, but I did not find the above data for Seaview 7. So, could Hilcorp please submit the .las, .pdf, and
Alf files similar to those above for Seaview 7?
Thank you,
Steve Davies
Debra Oudean Hilcorp Alaska, LLC
GeoTech 3800 Centerpoint Drive
Anchorage, AK 99503
Tele: 907 777-8337
Hilrn�p MaA., I.M. Fax: 907 777-8510
E-mail: doudean@hilcorp.com
DATE 12/11/2019
To: AOGCC
Natural Resources Technician
333 W 7th Ave Ste 100
Anchorage, AK 99501
EdW
J Hilcorp Alaska Seaview 7_LAS
9/1.12017 7:29 AM
Hilcorp_Seaview_7 320ftTD 2in_Field_Lit...
9/25120172:24 PM
Hilcorp Seaview_7_32M TD 2in_Field Lit...
8/29/26176:24 PM
Hilcorp Seaview_7 320ft_TD_5in_Field _Lit ...
9/25/20172:22 PM
o. Hilcorp_5ea%iew7_320ftTD_5in_Field Lit...
V29120176:24 PM
.J Seavi._w 7 Mair•, Pass
9.11/2017 4:06 PM
Seaview7
9/1/20174:06 PM
fh Seaview7
9/25/20172:22 PM
LAS File
176 KB
TIF File
529 KB
PDF Document
93 KB
TIF File
541 KS
PDF Document
117 KB
LAS File
34 KB
PDF Document
892 KB
TIF File
4,778 KB
Please include current contact information if different from above.
/Z.c
\,4� , / Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Receive By: L Date:
/2 /� i�
DATA SUBMITTAL COMPLIANCE REPORT
10/28/2019
Permit to Drill 2171130 Well Name/No. SEAVIEW 7 Operator Hilcorp Alaska LLC API No. 50-231-20059-00.00
MD 322 TVD 322 Completion Date 9/11/2017 Completion Status INFO Current Status P&A UIC No
REQUIRED INFORMATION U44A
-Mvd Log _M e5 Samples Uil 2 S V, Directional Survey Yes
DATA INFORMATION
List of Logs Obtained: GR -CCL, Lithology
Well Log Information:
Log/
Interval CHI
Electr
Data
Digital
Dataset
Type
Med/Frmt
Number Name
ED
C
28704 Digital Data
ED
C
28704 Digital Data
ED
C
28704 Digital Data
Log
C
28704 Log Header Scans
Log
C
28836 Mud Log
ED
C
28836 Digital Data
ED C 28836 Digital Data
ED C 28836 Digital Data
ED C 28836 Digital Data
ED C 28836 Digital Data
Log C 28836 Log Header Scans
Well Cores/Samples Information:
Name
(from Master Well Data/Logs)
Log Log Run
Interval CHI
Scale Media No
Start
Stop CH
Received
Comments
322
2
10/17/2017
Electronic Data Set, Filename: Seaview 7 Main
Pass.las
10/17/2017
Electronic File: Seaview 7.pdf
10/17/2017
Electronic File: Seaview 7.tif
0
0
2171130 SEAVIEW 7 LOG HEADERS
2
10
320
10/17/2017
2 Lithology Logs
10
320
10/17/2017
Electronic Data Set, Filename:
H i Icorp_Alaska_Seaview_7_LAS.las
10/17/2017
Electronic File:
H i I corp_Seavi ew_7_320ft_T D_5i n_Field_Litholog
y_Log.tif
10/17/2017
Electronic File:
H i I co rp_Seaview_7_320ft_T D_2i n_Fi eld_Litholog
y_Log.pdf
10/17/2017
Electronic File:
H i I co rp_Seaview_7_320ft_T D_2i n_Fi eld_Litholog
y_Log.tif
10/17/2017
Electronic File:
H i I corp_Seaview_7_320ft_T D_5i n_Field_L ith o log
y_Log.pdf
0
0
2171130 SEAVIEW 7 LOG HEADERS
Sample
Interval
Set
Start Stop
Sent
Received
Number
Comments
AOG(C Page I oft Monday. October 28. 2019
d
D
a
a
E
O
U
`o
0
0
O
/"�
0
O
p
O
Z
VQ\x
Y Y Y
N
a
in
m
m Q
a
Z
a o Z
L L p
FL
U a m
Q
o a no
0 o m
U U J
¢
�
V
a
a � ¢
N
"
NrN
FL
m
CL
J
m
U
p
m
O
W
a
O
a
a
Q
m
W0)
n
O
w
N
E
LL E
" a
"
/
V
U
i
O
LL
N
N
m O 0
E J E
Z
Z
" w m
Q
"
° °m
J C
O "
J
a
n
E
5
li
O
U
U U
C �
c
o
G o
N
�
000
0
E
¢
m
U N
O
O
U
Z
C
J
Y Y
y
E
Q
c
oO
E
o
N
E
U
r
�
0
m
G
m
Q
� m
0
U
O 2 C)
a
Z
—
a
r
m
(�
e -
N
r
Q
�
Y Y
C
0
m
O
n
~
o
W
E n
O
2
p - "
0
2
d
—
a
O
a `/� x
K a
~ m
W
U
m
D
tia
c
O
r
N
N
f
Q
C
O p
Z
Q
o
O
D
O "
a
m 0
0
J
o.
o.
E
m
E
H
LL
o'
O
0
O
O
N
a O
O
6
U d C7
U
U
K
U
d
D
a
a
E
O
U
`o
Guhl, Meredith D (CED)
From: Frank, Kevin J (DNR)
Sent: Friday, October 11, 2019 8:57 AM
To: Guhl, Meredith D (CED)
Subject: Re: Seaview 7, PTD 217-113, Extended Confidentiality?
Hi Meredith
No there has been no such request made. Thanks for checking.
Cheers,
Kevin's n
Get Outlook for iOS
From: Guhl, Meredith D (CED) <meredith.guhl@alaska.gov>
Sent: Friday, October 11, 2019 8:36:52 AM
To: Frank, Kevin 1 (DNR) <kevin.frank@alaska.gov>
Subject: Seaview 7, PTD 217-113, Extended Confidentiality?
Hi Kevin,
Has Hilcorp requested extended confidentiality for Seaview 7 strat test well, due for release after today, October 11,
2019?
Thank you,
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
mered ith.gu h I @a laska.eov
Direct: (907) 793-1235
CONFIDENTIALITYNOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.¢uhl@alaska.¢ov.
H
IliLwrp Ah.A.. LLC
DATE 08/22/2018
25
Seth Nolan Hilcorp Alaska, LLC
GeoTech II 3800 Centerpoint Drive
Anchorage, AK 99503
Tele: 907 777-8308
Fax: 907 777-8510
E-mail: snolan@hilcorp.com
CONHOENTIAL
RECUVED
To: Alaska Oil & Gas Conservation CommissWO LONGER
Meredith Guhl CONFIDENTIAL
Petroleum Geology Assistant
333 W 7th Ave Ste 100 OCT 1 1 2019
Anchorage, AK
99501
SEAVIEW STRATIGRAPHIC TESTS
WELL SAMPLE INTERVAL
Seaview 7 30' -J30f1 Wgotal samples)
Please include current contact information if different from above.
AUG 2 2 2018
AOGCC
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Date: 6 ( 2 3
Guhl, Meredith D (DOA)
From:
Cody Dinger <cdinger@hilcorp.com>
Sent:
Thursday, December 7, 2017 7:46 AM
To:
Guhl, Meredith D (DOA)
Cc:
Davies, Stephen F (DOA)
Subject:
FW: Formations at TD for Pearl & Seaview Strat Test Wells
Hi Meredith,
Here are the formations at TD below.
Thanks,
Cody
From: David Buthman
Sent: Thursday, December 07, 2017 7:18 AM
To: Cody Dinger <cdinger@hilcorp.com>
Subject: RE: Formations at TD for Pearl & Seaview Strat Test Wells
Hi Cody,
Here's the formations at TD listing, below.
Rgds,
Dave
Formation at TD:
Strat Test Well
Name
Formation at TD
Pearl 1A
Upper Middle
Sterling
Pearl
Upper Middle
Sterling
Pearl
Upper Middle
Sterling
Pearl
Upper Middle
Sterling
Pearl
Upper Middle
Sterling
Pearl
Upper Middle
Sterling
Pearl
Upper Middle
Sterling
Seaview 1
Beluga
Seaview 2
Beluga
Seaview 3
Beluga
Seaview 4
Beluga
Seaview 5
Beluga
Seaview 6
Beluga
Upper Miu..,e
Seaview 7 Sterling
DB 12/7/2017
From: Cody Dinger
Sent: Tuesday, December 05, 2017 11:28 AM
To: David Buthman <dbuthman@hilcorp.com>
Subject: FW: Formations at TO for Pearl & Seaview Strat Test Wells
Any thoughts on this?
From: Guhl, Meredith D (DOA) imaitto:meredith.auhl@alaska.eov)
Sent: Tuesday, December 05, 2017 11:26 AM
To: Cody Dinger <cdinter@hilcorp.com>
Cc: Davies, Stephen F (DOA) <steve.davies@alaska.gov>
Subject: Formations at TO for Pearl & Seaview Strat Test Wells
Hello Cody,
I'm starting a review of the data received for the Pearl and Seaview strat test wells (all 14 of them). One of the initial
issues I've noticed is none of the 10-407 forms have a formation listed at TD in Box 29. Could you please provide, at
minimum, the formation at TD for all Pearl and Seaview wells.
Thank you,
Meredith
Meredith Guhl
Petroleum Geology Assistant
Alaska Oil and Gas Conservation Commission
333 W. 7th Ave, Anchorage, AK 99501
meredith.guhl@alaska.¢ov
Direct: (907) 793-1235
CONFIDENTWITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information.
The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail,
please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at
907-793-1235 or meredith.euhl@alaska.eov.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1a. Well Status: Oil ❑ Gas E] SPLUG ❑ Other ❑ Abandoned 0 Suspended❑
20AAC 25.105 20MC 25.110
GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions:
1b. Well Class:
Development ❑ Exploratory ❑
Service ❑ Stratigraphic Test ❑✓
2. Operator Name:
Hilcorp Alaska, LLC
6. Date Comp., Susp., or
Abend.: 9/11/2017
14. Permit to Drill Number / Sundry.
217-113
3. Address:
3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503
7. Data Spudded:
August 28, 2017 •
15. API Number:
50-231-20059-00-00
4a. Location of Well (Governmental Section):
Surface: 656' FSL, 2462' FEL, Sec 9, T5S, R15W, SM, AK
Top of Productive Interval:
N/A
Total Depth:
656' FSL, 2462' FEL, Sec 9, T5S, RI 5W, SM, AK
8. Date TD Reached:
August 29, 2017
16. Well Name and Number:
Seaview 7
9. Ref Elevations: KB: pA/l,
GL:238.29' BF: N/A 44 i
17. Field / Pool(s):
N/A
10. Plug Back Depth MDf VD:
Surface
18. Property Designation:
KPB ROW/ ADL 392667
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 160814.3199 • y- 2106353.39 Zone- 4
TPI: x- y- Zone-
Total Depth: x- 160814.3199 y- 2106353.39 Zone- 4
11. Total Depth MDfrVD:
• 322'/ 322' •
19. DNR Approval Number:
N/A
12. SSSV Depth MDYTVD:
N/A
20. Thickness of Permafrost MD/TVD:
N/A
5. Directional or Inclination Survey: Yes (attached) No Q
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL) I
21. Re-drill/Lateral Top Window MD1TVD:
N/A
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR -CCL 2" MD, Lithology Log 2"/5" MD • RECEIVED
SEP 2 5 2017
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MHOLE SIZE CEMENTING RECORD D SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM PULLED
6-5/8" 17# A53B 20' 260' 20' 260' 6" 26 sx bentonite grout to P&A
24. Open to production or injection? Yes ❑ No Q
If Yes, list each interval open (MDf rVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
A �9a-'gtyu
t,2RfiF'i-E-�•F�JPI'
DA: rE
I/1111 -T_
VERIFIED
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MDrrVD)
N/A
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes No
Per 20 AAC 25.283 (1)(2) attach electronic and printed information
DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
N/A
Method of Operation (Flowing, gas lift, etc.):
N/A
Date of Test:
Hours Tested:
Production for
Test Period
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Size:
Gas -Oil Ratio:
Flow Tubing
Press.
Casing Press:
I
Calculated
24 -Hour Rate
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Oil Gravity -API (corr):
M" UIVIb i
Form 1007 Revised 512017 � /03/7 TI ED ON PAGE 2 tL � � � 1 Submit ORIGINAL onl%�,,
28. CORE DATA Conventional Core(s): Yes ❑ No ❑� • Sidewall Cores: Yes ❑ No Q
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑� `
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Permafrost - Base
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
N/A
information, including reports, per 20 AAC 25.071.
Formation at total depth:
/Y vo�G�e
NCt
31. List of Attachments: Wellbore Schematic, Drilling Reports, As Built Drawing, P&A Photos
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: Paul Mazzolini Contact Name: Cody Dinger
Authorized Title: Drilling Manager Contact Email: cclin er Q hIICOr .Com
Authorized n 04�z5 Contact Phone: 777-8389
�2A
Signature: p r� 41 Date: 1 7
INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitdnite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
0
cora Afmka. LLC
6-5iR-
TD = 322'/ TVD = 322'
Wellbore Schematic
Casing Detail
Location Anchor Point
Well Seaview 7
PTD: 217-113
API: 50-231-20059-00-00
Size
Type
Wt
Grade
Conn.
ID
Top
Btm
6-5/8"
Surf Csg
17
A -53B
Weld
6.125"
20'
260' .
Drilling Info
Hole Section
Casing
6"
6-5/8" x OH
Updated by CJD 09/25/2017
U
Well Name: Stratigraphic Test Wells
Field: Ninilchik
County/State: , Alaska
(LAT/LONG):
avation (RKB):
API M
Spud Date:
Job Name: 1741287 Seaview 7
Contractor
AFE M 1741287
AFE $:
Hilcorp Energy Company Composite Report
R
PRIM- ops summa
8/28/2017
MIRU. Move rig to Seaview 7. Spot tank, rig, pipe truck. Post permit and well sign.;Drill and drive 6-518" casing to 200'.
8/29/2017
MIRU, spot pipe truck.;Drill and drive 6-5/8" from 220' to 260'.;Drill 6" hoie from 260' to 322' TD. RDMO.
9/1/2017
MIRU Pollard Eline. PU GR and CBL tools. Log Well. Tag @ 322'.
9/11/2017
MIRU Kraxberger drilling. Spot rig over well and pipe truck. Pick up pipe cutter and RIH on 20' of drill pipe. Pressure up on cutter and rotate, good indication of
cut. POOH, inspect cutting tool.;Good. Cut @ 22'. PU 16 joints of 1" tubing and RIH. Tag bottom and begin mixing and pumping grout. Pump 26 sx of
Bentonite Grout ull 5 its every 8 sx pumped. Good returns to surface.;LD all tubing and put back on truck. Pull cut casing joint and lay down. Clean up site.
Well P&A'd. RDMO.
AS -BUILT: SEAVIEW 7
NOTES:
1. COORDINATES SHOWN ARE BASED UPON
DIFFERENTIALLY CORRECTED GPS OBSERVATIONS.
2. AS—BUILT SURVEY CONDUCTED SEPTEMBER 18,
2017.
3. ALL DISTANCES ARE IN U.S. SURVEY FEET.
4. SURVEYED NAVD88 (G12B) GROUND ELEVATION OF
SEAVIEW 7 = 238.29'
LEGEND:
O• AS—BUILT WELL LOCATION,
NO CASING VISIBLE
AS -BUILT SEAVIEW 7:
LOCATED WITHIN SECTION 9,
T5S, R15W, SM, AK
SPCS NAD27 AK Z4N:
LAT= 59'45'10.81070"N
LONG= 151'50'21.61202"W
N= 2,106,353.39'
E= 160,814.32'
OWNER:
KENAI PENINSULA BOROUGH
0 100 200
FEET
SCALE
OF AkgSI��
*: 49TH '.
��.... ..
y'. MICHAEL R. EW
1 ajf. LS -11794 ,moi
ROFESSION AVVP�O+��
-N-
i
\T55 16
i
VICINITY MAP: 1" = 1 Mile
SURVEYOR'S CERTIFICATE:
I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT
EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT
SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE
BEST OF MY KNOWLEDGE.
RFCO1V /` TT RECON, LLC
1 481 W. RECON CIR.
PALMER, AK 99645
1 DATE: 9/20/2017 1 DRAWING: HilcorpDeepAsBuilt_Seaview I SHEET: 1 OF 1 I REV:
LOT 4
DPHASE
SEAVIEW 7
>
•
0
ED
N
Z
LOT 5
LOT 6
SURVEYOR'S CERTIFICATE:
I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT
EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT
SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE
BEST OF MY KNOWLEDGE.
RFCO1V /` TT RECON, LLC
1 481 W. RECON CIR.
PALMER, AK 99645
1 DATE: 9/20/2017 1 DRAWING: HilcorpDeepAsBuilt_Seaview I SHEET: 1 OF 1 I REV:
, �,' x �,t$ e'i '` �a .�'�i` "�,. rye` �,✓(r4.� ���
�� a f r� °�� . _} ! 3 yj y� 5 —+.S (. M1 9.?n. } 4 ,• t'YP � �' .
.� SY 444 i' '1� �t. � $t i ' `"� � '}r a i ♦ , ?d r lT ajjx�^�'°.b
�a ,�, f �irr bid r ,/'rl. , I 4jreM'11. r •{� t 'F ? y r. i 4t' F
�{ 'kY ��.�w 4 1P � N � 'J�d51 (�`� „�Y yY.,�i,P J y �r�A r.�,J }(•� r �''.r
i �rT
k Wife,
X ' re AJ t.�?�✓ 1 _
�,I Y J ("� � � ■s-� Y f � < � if yi � � a �y � pmt .,V� � y<- �_')�� a .�,
, KY � t > a I • ^ yL � � v � it xt .' F r �rlr ; L#�StA yam. ? , '� 3�3�Y.� �(,yd��
1 F
y<At 14
t�9 a l� F��4- A�., '� �-�1 �+{ 1 9 '['Kyptr' ,t 1� 1 i • J < .�
��.t ri%rA�a � iF ✓:"} i-� d wF� , V. P : �� . ',,! r i '' � ,f '''-r rr � � �.J
tY�"y ..}�` t �,� d` A j e.': � r 1 er'ar ,., rvr, y ''< ^g� � 4* •.
�F' `i.� .�<y- �< <y ?1 + -�"' x SPA<`'4 �� is 'r Y • A r'♦`,1� �
f r yi r. ✓n
If o"ff
`�
lTp y t. i1 n
" , a i `..�, t i �� r rl�1T •}<r �r"r � cyj ��+ r.ia.>J�.. :.: Q' �T4 L
v.� !b' ♦! r'€ 555 .0 'tL` !'.R , y �.+`: rj ';y� } "' -�
34ee�r'�� ��ry
� H ' i t r� ' 4 ♦ � r. E 4i` of �r � T�'+ r A s+ P E +'1, l fi 1. t i f
{ i
r 44r 'Vrd'•
(x•� � ti, �{f .r�� . Yj4'�r• �� r, < ��' p � .�� 2�rt sfl U - iA�f . �,- o.{_ `, 's°
tit
rt D wt
Aj ♦# tori �a�U sr� t � s +! ,� H 31 r Y., � A� i�.i x
a}. PA r�� �. r'i�` q i �,. 1 iY2',•r 1"�ySyy ;olp�^yp���ry ; �L. �(� v h ,�'' ver +.�jh r S` �
a
n
DATE 09/25/2017
Seth Nolan
GeoTech II
RECEIVED
OCT 17 2017
AOGCC
Hilcorp Alaska, LLC
3800 Centerpoint Drive
Anchorage, AK 99503
Tele: 907 777-8308
Fax: 907 777-8510
E-mail: snolan@hilcorp.com
To: Alaska Oil & Gas Conservation Commission
Makana Bender
Natural Resource Technician
333 W 7th Ave Ste 100
Anchorage, AK
99501
CD in 217-107
Log prints and data
Prints:
Seaview 1: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 17
1 0 7
2 8
6
9
8
Seaview 2: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1
7 1 0 8
2 8
6
9
9
Seaview 3: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1
7 1 0 9
2 8
7
0
0
Seaview 4: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1
7 1 1 0
2 8
7
0
1
Seaview 5: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1
7 1 1 1
28
7
0
2
2 1
7 1 1 2
28
7
0
3
Seaview 6: GR -CCL 2" MD, Lithology Log 2"/5" MD
Seaview 7: GR -CCL 2" MD, Lithology Log 2'y5" MD 2
1 7 1 1 3
28
7
0
4
Cl): 1 Electric logs
Seaview 1 9/25/2017 2:28 PM
File folder
Seaview 2 9/25/2017 2:28 PM
File folder
Seaview 3 9/25/2017 2:29 PM
File folder
Seaview 4 9/25/2017 2:29 PM
File folder
Seaview 5 9/25/2017 2:29 PM
File folder
Seaview 6 9/25/2017 2:29 PM
File folder
. Seaview 7 9/25/2017 2:29 PM
File folder
Please include current contact information if different from above.
zC`6 3(�c
Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510
Received Bv., . _ - 11 1 Date:
Davies, Stephen F (DOA)
From: Davies, Stephen F (DOA)
Sent: Tuesday, August 29, 2017 11:09 AM
To: Paul Mazzolini; Cody Dinger; Cody Terrell; Keegan Fleming - (C)
Cc: Quick, Michael J (DOA); Bettis, Patricia K (DOA); Bender, Makana K (DOA); Guhl,
Meredith D (DOA)
Subject: Incorrect API Numbers for Seaview Wells
I owe you all an apology: the API numbers that I assigned to the Seaview stratigraphic test wells are incorrect. I used
the USGS Quad code for the Kenai Quadrangle (133) rather than the correct code for the Seldovia Quadrangle (231). The
next five digits to the right of the quad code in each API number are sequential, so the corrected API numbers will be
completely different, as shown below.
We are currently correcting this error in the AOGCC's databases, in well postings on AOGCC's website, and in the
AOGCC's paper records.
Please accept my apology for the efforts that Hilcorp must expend to correct its paper and electronic records.
A copy of this email will be placed in each of the above well files at the AOGCC to minimize future confusion. The
incorrect API numbers will not be re -used.
Let me know if you have any questions or comments.
Steve Davies
Senior Petroleum Geologist
Alaska Oil and Gas Conservation Commission (AOGCC)
CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.eov.
Current, Incorrect API
Permit
Operator
Well Name
Number
Correct API Number
2171070
HILCORP
SEAVIEW 1
50133206730000
50231200530000
2171080
HILCORP
SEAVIEW 2
50133206740000
50231200540000
2171090
HILCORP
SEAVIEW 3
50133206750000
50231200550000
2171100
HILCORP
SEAVIEW 4
50133206760000
50231200560000
2171110
HILCORP
SEAVIEW 5
50133206770000
50231200570000
2171120
HILCORP
SEAVIEW 6
50133206780000
50231200580000
2171130
HILCORP
SEAVIEW 7
50133206790000
50231200590000
We are currently correcting this error in the AOGCC's databases, in well postings on AOGCC's website, and in the
AOGCC's paper records.
Please accept my apology for the efforts that Hilcorp must expend to correct its paper and electronic records.
A copy of this email will be placed in each of the above well files at the AOGCC to minimize future confusion. The
incorrect API numbers will not be re -used.
Let me know if you have any questions or comments.
Steve Davies
Senior Petroleum Geologist
Alaska Oil and Gas Conservation Commission (AOGCC)
CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.eov.
THE STATE Alaska Oil and Gas
°fALASKA Conservation Commission
GOVERNOR BILL WALKER
Paul Mazzolini
Drilling Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.alaska.gov
Re: Exploratory Field, Exploratory Pool, Seaview 7
Hilcorp Alaska, LLC
Permit to Drill Number: 217-113
Surface Location: 590' FSL, 2519' FEL, SEC. 9, T5S, RI 5W, SM, AK
Bottomhole Location: 590' FSL, 2519' FEL, SEC. 9, T5S, RI 5W, SM, AK
Dear Mr. Mazzolini:
Enclosed is the approved application for permit to drill the above referenced stratigraphic test.
Hilcorp Alaska, LLC (Hilcorp) requests the following variances:
1. Hilcorp's request to waive wellbore surveys is APPROVED. The well depth is very
shallow (600 feet) and intent is to drill vertically.
2. Hilcorp's request to use standard water well drilling equipment that is commonly used in
the area is APPROVED under 20 AAC 25.037. The drilling rig will also use air instead of
drilling mud to remove cuttings which is also common. Due to shallow depth and nature
of the area conventional well control equipment is not needed or practical. Rig will use a
rotating head and large hose to direct returns to a tank.
3. Use of a diverter is WAIVED due to the shallow depth of the wellbore. As stated above a
rotating head system will be used as an alternate method of directing returns safely during
drilling operations.
4. Requirement under 20 AAC 25.120 to place a well abandonment marker on the casing stub
is WAIVED.
5. Hilcorp's request to use grout instead of cement to P&A wells is APPROVED. Grout is
commonly used to abandon water wells.
Additional Conditions of Approval:
1. Portable gas detection monitor (LEL) to be used on site. (minimum of 2 handheld meters)
2. Well may not be drilled any deeper than 600feet without written approval from the
AOGCC.
3. Photo document P&A operations: including casing cutoff, grout top and site clearance.
4. Transfer of wellbore to landowner for use as water well must be approved by AOGCC as
per 20 AAC 25.140
Permit to Drill: 217-113
Page 2 of 2
Dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In
addition to the well logging program proposed by Hilcorp in the attached application, the following
well logs are also required for this well:
Lithology log required in lieu of mud log.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
Photos and documentation from utility locates that demonstrate successful clearance of the drill
site must be provided to the AOGCC prior to spudding of Seaview 7.
This permit to drill does not exempt you from obtaining additional permits or approvals required
by law from other governmental agencies, and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued. A weekly status report is
required from the time the well is spudded until it is suspended or plugged and abandoned. The
report should be a generalized synopsis of the week's activities and is exclusively for the AOGCC's
internal use.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Hollis S. French
Chair
DATED this Z3 day of August, 2017.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMlboION
PERMIT TO DRILL
9n AAr. 95 nnr
1 a. Type of Work:
Drill 0 • Lateral ❑
Redrill ❑ Reentry ❑
1b. Proposed Well Class: Exploratory - Gas ❑
Stratigraphic Test ❑� • Development -Oil ❑
Exploratory - Oil ❑ Development - Gas ❑
Service - WAG ❑ Service - Disp ❑
Service - Winj ❑ Single Zone ❑
Service - Supply ❑ Multiple Zone ❑
1 c. Specify if well is proposed for:
Coalbed Gas ❑ Gas Hydrates ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
Hilcorp Alaska, LLC
5. Bond: Blanket ❑, - Single Well ❑
Bond No. 022035244 •
11. Well Name and Number:
Seaview 7 -
3. Address:
3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503
6. Proposed Depth:
MD: 600' - TVD: 600'
12. Field/Pool(s):
N/A
4a. Location of Well (Governmental Section):
Surface: 590' FSL, 2519' FEL, Sec 9, T5S, R15W, SM, AK
Top of Productive Horizon:
Total Depth:
590' FSL, 2519' FEL, Sec 9, TSS, R15W, SM, AK
7. Property Designation:
Surface: KPB ROW/ Subsurface: ADL 392667 -
8. DNR Approval Number:
NA
13. Approximate Spud Date:
8/5/2017
9. Acres in ProDerty:
NA Platted
14. Distance to Nearest PreDeft
28'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
Surface: x- 160,814.13' y- 2,106,348.84' Zone -4
10. KB Elevation above MSL (ft): 242.55 '
GL / BF Elevation above MSL (ft): 238.55
15. Distance to Nearest Well Open
to Same Pool: N/A
16. Deviated wells: Kickoff depth: N/A feet
Maximum Hole Angle: N/A degrees
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Downhole: 0-15 Surface: 0
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
6" 6 5/8" 17 A-53 Weld 150'
Surface Surface 150' 150'
19. PRESENT WELL CONDITION SUMMARY (To be completed far Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):
Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
Casing Length Size
Cement Volume MD TVD
Conductor/Structural
Surface
Intermediate
iLa
Production
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Hydraulic Fracture planned? Yes❑ No ❑+
20. Attachments: Property Plat ❑, BOP Sketch ❑ Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis[]
Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑ 20 AAC 25.050 requirements[]
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval. Contact Name: Paul Mazzolini
Authorized Name: Paul Mazzolini Contact Email: mazz0 int hilcor .
Authorized Title: Drilling Manager Contact Phone: 777-8369
r '7113
Authorized Signature: Date: z,0!
Commission Use Only
Permit to Drill {�(
Number: Z1 �- �`✓ •
API Numbe :
50- � '� �-C/�
Permit Approval ^
Date: a. 1 1
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed ethane, gas hydrates, or gas contained in shales: ly
—/
Other. 1'ij 2 , `� Samples sures: Yes No,❑,// Mud log req'd: Yes[] Nov
GL �j'tCnS �- L-+��r HzS measures: Yes ❑ NoL—d/ Directional svy sures: Yes❑ No
Spacing exception req'd: Yes ❑ Nolte Inclination -only svy req'd: Yes[] Nola/
Lc �t.(-,:-F-i p•.,. -f 67 �o p rp v Post initial injection MIT req'd: Yes❑ No❑
/e10tur d
APPROVED BY +(/� (6
Approved by: \ COMMISSIONER THE COMMISSION Date:
I A'� Submit Form and
Form 10-401 Revised 512017 aiR 1,14A rhonths from the date of approval per 20 AAC 25.005(8) Attachments in Duplicate
1 !ll��lll ����.... "� 6-2_z• 1'7
0
Hilmrp Alaska, LLC.
07/13/2017
Paul Mazzolini
Drilling Manager
Commissioner
Alaska Oil & Gas Conservation Commission
333 W. 71" Avenue
Anchorage, Alaska 99501
Re: Kenai Peninsula Shallow Stratigraphic Test Well Program Seaview 7
Dear Commissioner,
Hilcorp Alaska, LLC
P.O. Box 244027
Anchorage, AK 99524-4027
Tel 907 777 8369
Email pmazzolini@hilcorp.com
RECEIVE®
,JUL 14 7.017
AOGCC
Enclosed for review and approval is the Permit to Drill for the Seaview 7 shallow stratigraphic test well located near
Ninilchik, AK. Seaview 7 is one of the remaining 10 - 14 shallow vertical stratigraphic test wells to be drilled and
evaluated in the area between Ninilchik and Anchor Point on the southern Kenai Peninsula. The plan is to begin
drilling operations on or about August 5, 2017.
The goal of the shallow stratigraphic test well program is to penetrate 1-3 shallow coal seams and evaluate this
shallow wellbore with gamma ray and resistivity logs. A dipmeter log could also be run if requested by Geology to aid
in the evaluation of the stratigraphic test well.
Hilcorp will utilize a very experienced water well contractor on the Kenai Peninsula that will utilize best practices for
the drilling of the shallow stratigraphic test wells.
Hilcorp Alaska, LLC requests a variance from 20 AAC 25.035 (d) for utilizing diverter while drilling the shallow wells
required for the stratigraphic test well program. The basis for this variance is information gathered by Hilcorp Sr.
Geologist, David Buthman containing the shallowest gas shows and well test information from offset wells in the three
areas to be targeted by the stratigraphic well test program.
Hilcorp Alaska, LLC also requests a variance from 20AAC 25.050 for obtaining wellbore surveys due to the very
shallow wells being drilled for the stratigraphic test program.' A sign will be posted at each drilling location with the
well information required by AOGCC.
The shallow stratigraphic test wells will be drilled with air and the cuttings will be captured in a tank as per AAb 20 7 u Q,
25.047. Samples of these cuttings will be obtained every 30' for analysis. The cuttings will be sent to Kenai Gas Field
for disposal at G&I or to the Kenai Peninsula Borough landfill (authorization to do so has been obtained). Once drilled
and evaluated the wells will be plugged utilizing grout and cut off 10' below GL to complete the P&A. It is possible that
some of the landowners may want to complete wells as a water source, in which case 20 AAC 25.140 requirements
will be followed.
Approvals from surface landowners have been obtained prior to surveying, staking and preparation of the site for
each stratigraphic test well. These approvals are included as an attachment with each PTD application. Care has
been taken to place drilling locations near access roads and to minimize location site preparation by utilizing a 35'x
70' footprint.
If you have any questions, please don't hesitate to contact me at 777-8369 (office) or 317-1275 (mobile).
Suer
Paul Mazzolilini
Drilling Manager
Hilcorp Alaska, LLC Page 1 of 1
6-5/8,,
6" Hole
N
corp AWkp LLC
YY�HSQOIr�pUH i �
PROPOSED
WELLBORE
Casing Detail
Location Anchor Point
Well Seaview 7
PTD: TBD
API: TBD
Size
Type
Wt
Grade
Conn.
ID
Top
Btm
6-5/8"
Surf Csg
17
A-53
Weld
6"
Surf
150'
Drilling Info
Updated by CJD 06/9/2017
Hole Section
Casing
6-5/8"
6"
x OH
Updated by CJD 06/9/2017
Shallow Stratigraphic Test Well Plan
Seaview 7
1. MIRU truck mounted drilling unit with support equipment onto 35' x 70' location.
2. Drive 6 5/8" casing through upper 100'-150' due to unstable hole conditions -
3. Drill 6" vertical hole until one of 3 distinct coal seams is penetrated 500'- 600'. Base case is to air drill
hole to TD.
a. Samples to be gathered every 30' for geological review.
b. A lithology log will be generated.
4. Once 6" hole drilled to TD, fill with freshwater or viscosified water to keep hole full for logging, approx.
21 bbls for gauge hole to 600' (.035 bbl/ft).
5. Remove cuttings from cuttings tank and haul to G&I in Kenai Gas Field for disposal or to Kenai Borough
Landfill. (21 bbls /hole)
6. RDMO truck mounted drilling unit and support equipment. Move to next strat test well location.
7. Rig up logging unit and log 6" hole with Gamma / Resistivity. Geologist may request a dipmeter be run.
8. Rig down logging unit and move to next strat well.
9. MIRU truck mounted drilling unit with support equipment.
10. RIH with tubing and spot grout/ bentonite plug from TD to surface.
11. Set surface grout/ bentonite plug within 10' of surface, cut and remove 10' of 6 5/8" casing. Fill in
hole. No welded cap on 6 5/8" casing as per waiver from AOGCC.
12. RDMO truck mounted drilling unit and support equipment.
13. No welded cap is required on 6-5/8" surface casing per waiver from AOGCC.
14. Portable gas detectors will be placed at the Drillers console and at the cuttings tank. -
15. A lithology log will be generated and submitted to the AOGCC.
Stratigraphic Test Well Program
Project Description
The Hilcorp Alaska, LLC stratigraphic test well program will be performed from June -December of 2017, and
possibly into Q1 of 2018 depending on the ability to build packed snow and ice roads into the locations
located in swampy areas. Hilcorp anticipates drilling 16-20 stratigraphic test wells, each up to 600' deep that
will be drilled and evaluated on the southern end of the Kenai. Peninsula between Ninilchik and Anchor Point.
The areas have been named Seaview (near Anchor Point), Pearl (near Ninilchik) and Deep Creek (for the inland
locations about 5 miles south of the Happy Valley gas field). These stratigraphic test wells intend to penetrate
1-3 shallow coal seams within 500'-600' from surface. Once.these coal seams have been penetrated each
stratigraphic hole will be filled with freshwater and logged with gamma ray and resistivity tools on a single run.
Hilcorp geologists may determine that a dipmeter log also be obtained in some of the stratigraphic test wells.
The chosen contractor is very experienced in drilling wells within this shallow hole sectionyon the Kenai
Peninsula and will use air drilling to drill the stratigraphic test wells to depth. Best practices will be utilized to
drill and abandon these shallow stratigraphic test wells. Casing will be required in the top. 100' —150' of hole
due to formation instability issues and will be drilled into place. The cuttings generated from the air drilling
operations will be captured in a tank and samples will be obtained approximately every 30'. These cuttings
will be hauled to the G&I Facility in the Kenai Gas Field for disposal or taken to the Kenai Peninsula Borough
landfill.
After each test well has been evaluated, it will be plugged with grout/bentonite mixture as required to meet
regulatory requirements. Once a grout plug has been set to within 10' of surface, the casing will be cutoff
and the hole buried to complete the P&A of each stratigraphic test well. Once all drilling and data evaluation
work has been completed, all locations will be cleaned up to the individual land owners satisfaction.
Permission will be obtained from each land owner for all activities on their property to include surveying, site
preparation, drilling activities, and data collection/evaluation of each stratigraphic test well.
Thestratigraphic test well locations were chosen to minimize impact to the surface owners. The area required
for each stratigraphic test well is approximately 35'.x 70'. Should soil conditions require, rig mats will be set in
place to provide the drill rig unit and support equipment.a firm and stable work surface. The locations have
been placed near established roads and tight of ways to minimize the length of any additionally needed access
roads.
Four locations in the Deep Creek area will require packed snow and ice roads to access swampy areas so that
drilling and evaluation,work will be completed in Q4 2017 or Q12018, once the ground has sufficiently frozen.
Work for the Q4 2017 / Q12018 stratigrabhic test wells will be completed in the same manner as those drilled
and evaluated during the summer.
(COO NRDENVUL
8 May 2017
Alaska Oil and Gas Commission
ATTN: Steve Davies
Hilcorp Alaska, LLC
ATTN: Paul Mazzolini
RE: Shallow Stratigraphic Test Well Program Geologic Hazard Analysis
Hilcorp Alaska, LLC has analyzed nearby oil and gas test wells, water wells, nearby gas producing wells,
and seismic data on the southern Kenai Peninsula and do not anticipate any shallow gas at depths
between 500' and 850' for the Stratigraphic Test Well Program. Therefore a waiver is requested for
utilizing a diverter that is typical on deeper drilling oil and gas operations. The information that follows
was utilized to determine the need for the diverter to drill the shallow stratigraphic test wells.
Hilcorp Alaska, LLC is planning on drilling shallow stratigraphic test wells in three areas: Ninilchik, Deep
Creek Unit, and Anchor Point. For each of these areas, geotechnical evidence indicates no shallow
hazards.
M. Guhl 10/29/2019 4 5
HALUIBUR'TUN
Dawrlpdcn 0var6dru,,atdI0n
RWCH-12345678
135.007b9
Weak Point 10000 lbs -
12345678
0.01 lbs
GTET-12345678
165.00 Its
0
SP Ring -12345678
0.00 lbs
Cabbage Head -
12345678
10.00 lbs
TOOL STRING DIAGRAM: GTET.XRMI-ACRT
O.D. Diagram sensors @DOW9
92.310 in -0
93.625 in I
00.010 Ire 0
93.625 in --R
9 3.625 in* --0
03 ' 625 in
05.000 In
�rreedv
Tvp1 Name
RWCH
Releasable Wireline Cable Head
WP10K
Weak Point 10000 lbs
GTET
Gamma Telemeby Tool
XRMI
XRMI Navigation - Insite
XRMI_I
XRMI Imager-.Insite
ACRt
Airily Compensated True Resistivity Instrument Section
ACRt
Array Compensated True Resistivity Sonde Section
Sp
SP Ring
RSGF
Regal Standoff 6.75in
CBHD
Cabbage Head
Total
Data: GTET-XRMI-ACRT
*- Fishing Neck@59.18ft
Lcad Cell Q 5638 ft
E-_ BH Temperature Q 55.81 it
-( Qo 53-35 it
E.. GammaRayQ47.75ft
,! SP@1.88ft
Length A` ilea
60.06 H
6.25 ft
53,57 st
8.528
it
0.56 ft
0.681
0.00 ft
serial
Weight
Length
ypwd
Number
(Ihs)
(ft)
00
&MI
12345678
135.00
6,25
53.81
300.00
12345678
0.01
0.01 *
54.61
300.00
12345678
165.00
8.52
45.29
60.00
12345678
290.00
14.30
30.99
moo
12345678
206.00
11.16
19.83
30.00
12345678
50.00
5.03
14.80
120.00
12345678
200.00
14.22
0.5B
120.00
12345678
0.00
0.25
1.86
300.00
11111111
20.00
0.52 *
iota@
300.60
12345678
10.00
0.58
0.06
306.00
1,076.01
60.06
*
Not included In Total
Length and
Length Accumulation.
Date:
03 -May -1717:02:12
RWCH-12345678
135.00 it.
Weak Point 10000lbs-
1234567B
0.01 His
GTET-12345678
165.00 Ibs
XRMl4Instrument-
12345678
MOM lb.
XRMI-1 Mandrel -
12345578
206.00 its
Bell Naso -12345678
5.08lb.
Ai.auldb a
ptriemenlo
Tool Name Number
RWCH'
Re leasable Wireline
WP19R
Weak Point
GTET
Gamma TelemetryT
XRM(
XR 11 N.avi9ation=ln
XRMI-I
XRMI Imager-Insite
BLNS
Bull Nose
25,79
BH Temperature 939.31 it
Total
280.00 14.30
+-1 I. M
TOOL STRING DIAGRAM : GTET-XRMI
Mennen
Sensors Delays
Ai.auldb a
8114w
Tool Name Number
40,56 ft
62.310 in
lead 12345678
FishingNeck @39,68ft
34.31
UX
300.00
03.625 In
0.01 0.01
Load Cell( a} 36.66 ft
C-25
5ft
12845678
165.00 8.52
25,79
BH Temperature 939.31 it
12345fi78
280.00 14.30
69.919 in' �0
30,00
12345678
206.00 11.16
0.33
80.00
12945678
5.00 0.33
O.OU
34.31 ft
801.01 40.56
ZP.ccelemmeter@33.Bfift
63,625 in __`.
64.500 in -.I
65.009 in ---).
64500 in -0
62.750 in .---j
EE GammaRay@23.25 it
Pads 204, 5@3.10ft
Pads 1, 3, S Q2.87 ft
8.52 ft
14.30 Jt
aft
11,16 ft
0:33 ff
0.337
Unit
-
Seim
Y[llbs) t 1 (11) l -
1
8114w
Tool Name Number
.
lead 12345678
135.00 825
34.31
UX
300.00
is 12345878
0.01 0.01
35-'11
300.00
12845678
165.00 8.52
25,79
60.60
12345fi78
280.00 14.30
' v A -p
30,00
12345678
206.00 11.16
0.33
80.00
12945678
5.00 0.33
O.OU
300.00
801.01 40.56
included in Total Length and
Length Accumulation.
'
Data:
03-May.1716:18:07
U)
C)
CD
00
x
0
b.0
CD
C
CO
0
lj�
N
N x
m
00
x
1
00
x
U
CY)
U
-STAKED
NOTES:
1. COORDINATES SHOWN ARE BASED UPON
DIFFERENTIALLY CORRECTED GPS OBSERVATIONS.
2. AS -STAKED SURVEY CONDUCTED MAY 23, 2017.
3. ALL DISTANCES ARE IN U.S. SURVEY FEET.
4. SURVEYED NAVD88 (G128) ELEVATION OF
SEAVIEW 7 = 238.55' -
LEGEND:
0 SET BRASS CAP MONUMENT ON
5/8" X 30" REBAR
AS—STAKED SEAVIEW 7:
LOCATED WITHIN SECTION 9,
TSS, R15W, SM, AK
SPCS NAD27 AK 24N:
LAT= 59'45'10.76583"N
LONG= 151'50'21.61320"W
N= 2,106,348.84'-
E= 160,814.13'
SPCS NAD83 AK Z4N:
LAT= 59'45'08.56178"N
LONG= 151'50'29.39235"W
N= 2,106,105.37'
E= 1,300,839.33'.
OWNER:
KENAI PENINSULA BOROUGH
0 100 200
FEET La�
SCALE
*: �9 TH
P'. MICHAEL WE I : Q
AW
ESSIONNLta���Zr
North
SURVEYOR'S CERTIFICATE:
I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -STAKED
EXHIBIT REPRESENTS A.SURVEY MADE BY ME OR UNDER MY DIRECT
SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE
BEST OF MY KNOWLEDGE.
RICON, LLC
�OST �iE 481 W. RECON CIR.
11Y PALMER, AK 99645
OT 2
OLSON HILLS
LOT 4
PHASE ONE
LOT 3
o
RO ND
o
SEAVIEW 7
O�SpN
0
NARRY
0
m
D
w
U LOT 8
z
OT 5
U
z
LOT 7
LOT 6
\
SURVEYOR'S CERTIFICATE:
I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -STAKED
EXHIBIT REPRESENTS A.SURVEY MADE BY ME OR UNDER MY DIRECT
SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE
BEST OF MY KNOWLEDGE.
RICON, LLC
�OST �iE 481 W. RECON CIR.
11Y PALMER, AK 99645
Davies, Stephen F (DOA)
From:
Cody Terrell <cterrell@hilcorp.com>
Sent:
Monday, August 21, 2017 9:28 AM
To:
Davies, Stephen F (DOA)
Cc:
Cody Dinger; Paul Mazzolini
Subject:
Seaview 7 Strat Test KPB Permit
Attachments:
Seaview 07 KPB Permit 17-129P 8-2-17.pdf
Steve,
See attached KPB permit for Seaview 7 strat test well.
Regards,
Cody T. Terrell I Landman I Hilcorp Alaska, LLC
O: 907-777-8432 1 C: 713-870-4532 1 cterrell(a-)hilcorp.com
3800 Centerpoint Dr., Suite 1400 1 Anchorage I Alaska 199503
This email may contain confidential and / or privileged information
and is intended for the recipient(s) only. In the event you receive
this message in error, please notify me and delete the message.
Road Service Area
47140 E. Poppy Lane • Soldotna, Alaska 99669
(907) 262-4427 office, (907) 262-6090 lax
www.borough.kenai.ak.us/roads
R.O.W. PERMIT - PROJECT SPECIFIC
MIKE NAVARRE
BOROUGH MAYOR
'This permit Is to be completed by the RSA Director'
❑Road Construction ®Other: Drilling project - data gathering
Category of Road: WA Width WA Length NIA
Road Names: Harry Olson Rd Region/Unit: South 3
Applicant Name: Hillcorp Alaska LLC Contractor: Kraxberger Drilling
Inspector Name: Jed Painter ,m RSA Phone # 262-4427
The uired to call the Ins or for a minimum of 5Inspections: For all Road Construction
4p as fabric being plae .
-24d when the first Iiti (less then 121nches deep acted.
3n° when next Illt Is being compacted.
4r^ for substantial comp!5111 In a punch list of Items to complete
•Note
-As required by KPB ruction Standards: -Road Construction shall meet or exceed all curr tandards.
Exceptions must be Pre-afoprovedBoard or RSA Director and noted on
-Due to soil complexities the RSA recommends perms enlist icensed road construction contractor and/or engineer.
-It is the applicant's responsibility to determine then acgmr local, state, or federal permits and to ensure all construction
activity complies with all federal, s laws.
-It is the appli si dity to survey the proposed Right -of -Way for construction and property Iota ed road and all utilities in
-0 -Way.
RSA Special Provisions:
Applicant proposes to place a drill rig near the westerly terminus of Harry Olson Road for the purpose of gathering
data. Project is temporary, planned to span a period between 8.18 and 9-8, 2017. Schedule may be adjusted as
necessary, but in any case will adhere to project specifications cited in attached application.
RSA Special Provisions: Contact Road Inspector prior to start of work.
1. Drill outside of road prism if possible.
2. If drilling through road prism cannot be avoided, make road repairs before leaving site.
3. Coordinate with local residents affected to ensure adequate access during times of necessary road closure.
Approved: ® Denied: ❑ Revoked: ❑
Permit # - 17-9 mi Issue Date: 8.2-17 Permit Expires: 9.30.17
By RSA Director Date: 8-2.17
Date approved by RSA Board (if required): NIA
Regulation of Traffic Flow During Construction: Permit holder may regulate traffic by (signage! regulatory device/ barricade)
during hours of: As required during daylight hours from (date) 8.18.17 to (date) 9-30-17
KENAI PENINSULA BOROUGH AUG 01 7017
I �P', Road Service Area
L'�B- 47140 E. Poppy Lane • Soldotna. Alaska 99669
Toll-free within the Borough: 1-800-478-4427 Road Service Area
PHONE. (907) 262-4427 . FAX (907) 262-6090
y www.kpb us
PROJECT SPECIFIC RIGHT-OF-WAY (ROW) CONSTRUCTION
PERMIT APPLICATION
FIRoad Construction Project
Other (Excluding Driveways)
Please List: Drilling Project - data gathering, temporary use
1-1 Existing Road Upgrade ❑ New Road Construction
Road Construction Not 'Alternate Design F -I -Engineered Design 'Category IV Rd
to KPB 14.06 Standards
(These reouire Prior RSA board approval before construction)
It is the applicant's responsibility to determine the need for any other local, state or
federal permits and acquire the same. Similarly, it is the applicant's responsibility to
ensure all construction activity complies with all Federal, State, and Local laws.
APPLICANT NAME: Hilcorp Alaska, LLC
APPLICANT MAILINGADDRESS:3800 "e'n}erpoinL}
Dr'
CITY: Anchorage STATE
TELEPHONE: 907-777-8432 CELL Hone
CONTRACTOR NAME:' `raxbe'rge'r Drilling
02
99503
ZIP:
907-777-8580
ROAD NAME. Harry Olson Road SUBDIVISION: Olson HIIIS Phase One
EMAIL:cterrell@hilcorp.com REGIONIUNIT(DetermmedbyRSA) 53
APPROXIMATE START DA
08/18/17 APPROXIMATE COMPLETION DATE.
09/08/17
Revised 9212016 Page I or 4
REQUIRED ATTACHMENTS: OTHER ATTACHMENTS: lir apoicabler
❑✓ Attachment A (page 4) ❑Engineering Design
Preliminary Plat or Final Plat ❑Other Government Agency
Map Applications/Permits
F]As-Built Survey
Where information provided by existing topographic maps, aerial photography, and
photographs is inadequate to accurately reflect conditions of the right-of-way or
potential problems created or exacerbated by construction, additional information, surveys,
or engineering analysis may be required prior to issuance of a permit.
TRAFFIC FLOW: Applicant may request authority to regulate traffic: nYesn No during the
following hours of the day on the following dates: during project (8-18- to 9 -PI
- )
Applicant shall provide signage and safeguards in accordance with the Alaska Traffic Manual
and shall obtain any further permission for such routing from appropriate entities including but
not limited to fire, emergency medical, police, and school transportation agencies.
Road passage or alternate access must be maintained or provided to residents at all
times.
WATER BODIES: (KPB 14.40.061)
All floodplains, floodways, wetlands, streams lakes, or other water bodies adjacent to or within
50 feet of the outer boundaries of the right-of-way must be clearly delineated on a map
attached to application. Are water bodies as described above present within 50 feet of right-of-
way? DYes Ft✓ No.
Development conditions for rights-of-way accessing water bodies. No development within 100
feet of the high water mark of a waterbody within a right-of-way providing access to the
waterbody may occur without a permit. All permits issued under this section shall be submitted
to the RSA Board for its consideration. If applicable, date and Resolution No. of RSA
Board approval
Right-of-way construction permits pursuant to KPB 14.40.040-14.40.060 will not be issued to
construct any part of a road or driveway or other development within the right-of-way where the
construction or development will be parallel and within 100 feet of the ordinary high water mark
of a watercourse or lake unless necessary for access to a lot where no reasonable alternative
access exists or unless the road is for access to a bridge or public facility, waterbody, or
watercourse. Construction will ❑✓ will not occur within 100 feet of the ordinary high water
mark of a watercourse.
Pursuant to KPB 14.40.040-14.40.060 for waterbody crossings where a dedication crosses a
waterbody catalogued as important to the protection of anadromous fish under
AS 41.14.870(a) as now enacted or hereinafter amended, applicants must provide completed
application for project permits to the United States Army Corps of Engineers and
RevIse0 9212015 Page 2 W 4
Alaska Department of Fish and Game Division of Habitat. Anadromous waterbody crossings
must be designed by a licensed civil engineer and submitted to the RSA Board for review and
approval prior to construction. Designs must comply with KPB 14.40.061 requirements.
US Army Corp of Engineers Project Permit No. Issued on
AK Dept. of Fish & Game Permit No. Issued on
✓ Construction does not cross dedicated catalogued waterbody as described above.
THE KENAI PENINSULA BOROUGH SPECIFICALLY DISCLAIMS ANY WARRANTY OR
LIABILITY REGARDING LOCATION OR COORDINATION WITH UTILITY COMPANIES.
Statement of Applicant: I hereby affirm and agree that the work necessary to bring the
project described herein to applicable roads standards as described in KPB 14.06 will be, or
has been completed, to follow all permit requirements contained herein, in KPB 14.40 and
Attachment B "Mandatory Conditions'. By signing this application I certify that all the
information provided above is true and accurate to the best of my knowledge that I am the
responsible party for all project construction and that I am responsible for all communication
with the Road Service Area (RSA). I further acknowledge and agree that any violation of a
permit condition or failure to obtain a permit for work in a ROW is subject to a civil penalty of
up to 300 per day pursuant to KPB 14.40.380.
7-.�ii- r7
cant Date
INDEMNIFICATION: By signing this application, I hereby acknowledge that the permittee
shall indemnify, defend, and hold and save the borough, its elected and appointed officers,
agents and employees harmless from any and all claims, demands, suits, or liability of any
nature, kind or character including costs, expenses, and attorneys fees. The permittee
shall be responsible under this clause for any and all legal actions or claims of any character
arising from applicant or applicant's agents' performance or failure to perform this permit in any
way whatsoever. This defense and indemnification responsibility includes claims alleging acts
or omissions of the borough or its agents, which are said to have contributed to the
losses, failure, violations, or damages. KPB 14.40.060.
7 -o4 -r
of Applicant Date
Pursuant to KPB 14.40.060(c), this permit may be subject to additional conditions to
protect and manage borough ROWS by preventing damage to ROWs and adjacent
public and private properties or waterbodies. This Permit may be revoked at any
time for the Borough's convenience or for failure to comply with requirements
herein, KPB code, or other applicable local, state, or federal law.
Incomplete permit forms will be returned to applicants.
Will Road Maintenance be requested? FlYes V/IN
If yes, a separate Road Maintenance Application must be submitted by September 151 for
consideration that calendar year.
Revised &214016 Page 3 o14
RSA RIGHT-OF-WAY CONSTRUCTION PROJECT
DESCRIIPTION ATTACHMENT A
(Pursuant to KPB Chapter 14.40.050)
PROJECT DESCRIPTION: (use extra pages if necessary)
1. Brief narrative of construction plans:
Pro6ect is planned to last 5-10 days beginning Aug.18 2017 to Sep 8 2017 Schedule
may be adjusted final spud date is TBD.
2. Proposed design and method of construction:
NIA. Site use will be temporary
3. Statement of length and width of project and right-of-way to be constructed:
N/A. Site use will be temporary.
4. Approximate grade of natural terrain and final grade of proposed construction:
NIA.
5. Soil conditions of area subject to construction:___
Gravel Road,
6. Identify all properties affected, served or accessed by the proposed construction,
provide owner name and parcel numbers:
7. Brief narrative of construction plans:
N/A. Site use will be temporary and no permanent modifications are planned. Site will
be returned to pre -drilling conditions immediately following drilling operations.
8. Proposed uses after construction:
N/A. Site use will be temporary and no permanent modifications are planned. Site will
be returned to pre -drilling conditions immediately following drilling operations.
Revised 9121/2016 Page 4 of 4
S -STAKED!
S.
ROJECT LOCniFO IN SC[ 9, i 5 S. R 15 W. S.M.
"
ANCHOR PONT
NOIES:
s
-2
I. COORDINATES SHOWN ARE BASED UPON
Ci ,i
DIFFERENTIALLY CORRECTED GPS OBSERVATIONS.
l
2. AS -STAKED SURVEY CONDUCTED MAY 23, 2017.
3. ALL DISTANCES ARE IN U.S SURVEY FEET.t-
4. SURVEYED NAVD88 (G128) ELEVATION OF
SEAVIEW 7 = 238.55'
- S�}y 1-R•.
"e•
-
11
9 ip
SEAV IN 7 T`
�l
LEGEND:
rss isi5;_`1'='
_
fE SET BRASS CAP MONUMENT ON
VICINITY MAP: 1" - 1 Mile
5/8" X 30" REBAR
AS—STAKED SEATAEW 7
LOCATED WITHIN SECTION 9.
TSS. R15W. SM, AK
SPCS NAD27 AK Z4N:
LAT= 59'45'10.76583"N
LONG= 151'50'21.61320"W
N= 2.106,348.84'
E= 160,814.13'
SPCS NA083 AK Z4N:
LAT= 59'45'08.56178"N
LONG= 151'50'29.39235'W
N= 2,106,105.37'
E= 1,300.839.33'
OWNER:
KENAI PENINSULA BOROUGH
0 100 200
FEET
SCALE
TH
-.-MICHAEL R.EWIN7,
LS -11794 .•,c;'i
North
I
Te' z
OT A OLSON HILLS
PHASE ONE
LOT 3
11
0 0 HARRY _ ..
W,I LOT E
z K
LOT 5 U
I
a
I
Lor s
LOT I
i\
SURVEYOR'S CERTIFICATE:
I HEREBY CERTIFY THAI I AM REGISTERED AND LICENSED TO PRACTICE
LAND SURVEYING IN THE STATE OE ALASKA AND THAT THIS AS -STAKED
EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT
SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE
BEST OF MY KNOWLEDGE.
R ICON ,
DATE: 5/30/2017 I DRAWING: HllcorpDeepAsSloked-2 I SHEET: 1 OF 1 1REV: 0
Z-17- !l3
Davies, Stephen F (DOA)
From:
Cody Dinger <cdinger@hilcorp.com>
Sent:
Sunday, August 13, 2017 2:05 PM
To:
Davies, Stephen F (DOA)
Cc:
Paul Mazzolini; Schwartz, Guy L (DOA)
Subject:
Seaview Locates
Attachments:
Re: Seaview Locates No Conflict; Document to S Davies Locate Photos Seaview.pdf
Steve,
I have attached documentation of utility locates per our Conditions of Approval to drill the Seaview stratigraphic test
wells.
Please give me a call if you need further information.
Thanks,
Cody Dinger
509-768-8196
Steve,
Here are the locate photos for Seaview 1,2,3,4,5,7. 1 have attached an email from Enstar indicating no
conflict on wells except Seaview 4 (we are still about 40' from any gas lines).
Thanks,
Cody Dinger
509-768-8196
Seaview 7
11770
ri
3
a
N
Y
w
a
I�I11�-II
Ili _' � 1111 ,111,1
All uuq �i ul,,•
II
1111 111111
� % 111111 1.1111 Il
11. ,11'11 .111111'
,,,' 111111111IIIII III 1: 1111111��
/i
�', 1111 II,III II' 1 111
�- '. I11I11',11 111111 11111 .
t������ 111111 1111111 III 1•
%
1/Z
G�� � 1'1111111 111111111111111111111111111'111111111,1
X111 1111111111111111 1111
g ',�� �����A v`♦♦ 1111111111111111111111111111111�1111
g 1 �` 111 1 111 1111
111 I 1 1 1 I
/ � • ` . \ 11111 111 111
1 I 1 ® 1 I 1
L O
ti
0
A
T
J
J ❑
NO
n
W
N
N O
#
n
�
A
r L
�
J C
W
3
30
=
a
a
A
a
ry
Q
I�I11�-II
Ili _' � 1111 ,111,1
All uuq �i ul,,•
II
1111 111111
� % 111111 1.1111 Il
11. ,11'11 .111111'
,,,' 111111111IIIII III 1: 1111111��
/i
�', 1111 II,III II' 1 111
�- '. I11I11',11 111111 11111 .
t������ 111111 1111111 III 1•
%
1/Z
G�� � 1'1111111 111111111111111111111111111'111111111,1
X111 1111111111111111 1111
g ',�� �����A v`♦♦ 1111111111111111111111111111111�1111
g 1 �` 111 1 111 1111
111 I 1 1 1 I
/ � • ` . \ 11111 111 111
1 I 1 ® 1 I 1
L O
ti
0
A
T
J
J ❑
NO
K
71
R
A
t
3
m
=
a
a
A
ry
Q
ryJ
t
A
S
'J
Z
4O.
31000❑000
0
❑❑❑❑❑❑❑❑❑
K
71
i'
m .1
i Zf7-/�3
Davies, Stephen F (DOA)
From: Cody Terrell <cterrell@hilcorp.com>
Sent: Friday, July 21, 2017 11:40 AM
To: Davies, Stephen F (DOA)
Cc: Paul Mazzolini; Cody Dinger; Keegan Fleming
Subject: RE: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed
Yes, Seaview 3, 6, & 7 are all on KPB ROW.
We are waiting on approval by KPB. 1 will send approvals your way ASAP.
Regards,
Cody T. Terrell
Landman
Hilcorp Alaska, LLC
Direct: 907-777-8432
Cell: 713-870-4532
From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov]
Sent: Friday, July 21, 2017 9:11 AM
To: Cody Terrell <cterrell@hilcorp.com>
Subject: RE: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed
Thank you Cody. The AOGCC will also need the landowner approvals for Seaview 3, 6, and 7 before the Permits to Drill
can be granted. I assume that these are located on land owned by the Kenai Peninsula Borough or by the
State. Correct?
Regards,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies(@alaska.gov.
From: Cody Terrell [mailto:cterrell@hilcorp.com]
Sent: Friday, July 21, 2017 7:59 AM
To: Davies, Stephen F (DOA) <steve davies alaska.gov>
Subject: RE: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed
Steve,
1 attached to this email the surface owner approval for Seaview 1, along with the remaining private land owner approvals.
Please let me know if you need anything else.
Regards,
Cody T. Terrell
Landman
Hilcorp Alaska, LLC
Direct: 907-777-8432
Cell: 713-870-4532
From: Davies, Stephen F (DOA) [mailto:steve.davies(@alaska.gov)
Sent: Thursday, July 20, 2017 5:42 PM
To: Cody Terrell <cterrell@hilcorp.com>
Subject: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed
Cody,
I'm reviewing Hilcorp's Permit to Drill application for the Seaview 1 well, which reports an approximate spud date of July
24th. According to the Property Designation box on the application form, this well will be located on private
property. According to the cover letter accompanying Hilcorp's application:
"Approvals from surface landowners have been obtained prior to surveying, staking and preparation of the site
for each stratigrophic test well. These approvals are included as an attachment with each PTO application."
A copy of the landowner and surface owner approval was not attached to the Seaview 1 application. Could Hilcorp
please provide copies of these approvals to the AOGCC? The Permit to Drill for Seaview 1 cannot be granted without
these approvals.
Thanks,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas
Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential
and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If
you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware
of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov.
Remark:
AOGCC
Permit to Drill
26 July 2017
INPUT
Geographic, NAD27
OUTPUT
State Plane, NAD27
5004 -Alaska 4, U.S. Feet
SEAVIEW 7 1/1
Latitude: 59 45 10.76583 Northing1r. 2106348.837
Longitude: 151 50 21.61320 Easting/X: 160814.134
Convergence: -1 35 20.65986
Scale Factor: 1.000030941
Corpscon v6.0.1, U.S. Army Corps of Engineers
Remark:
ITSZr141PON
Permit to Drill
26 July 2017
INPUT OUTPUT
Geographic, NAD27 Geographic, NAD27
SEAVIEW 7 v1
Latitude: 59 45 10.76583 Latitude: 59.752990506
Longitude: 151 50 21.61320 Longitude: 151.839337000
Corpscon v6.0.1, U.S. Army Corps of Engineers
AOGCC
Permit to Drill
26 July 2017
INPUT
Geographic, NAD27
I
OUTPUT
Geographic, NAD83
Accuracies of conversions from NAD 27 to NAD 83 are typically 12 to 18 cm.
SEAVIEW 7 111
Latitude: 59 45 10.76583 Latitude: 59 45 08.56178
Longitude: 151 50 21.61320 Longitude: 151 50 29.39235
Datum Shift (m.): Delta Lat. = -68.208, Delta Lon = 121.476
Remark:
Corpscon v6.0.1, U.S. Army Corps of Engineers
Remark:
AOGCC
Permit to Drill
26 July 2017
INPUT OUTPUT
Geographic, NAD27 Geographic, NAD83
Accuracies of conversions from NAD 27 to NAD 83 are typically 12 to 18 cm.
SEAVIEW 7 111
Latitude: 59 45 10.76583 Latitude: 59.752378273
Longitude:151 50 21.61320 Longitude: 151.841497874
Datum Shift (m.): Delta Lat. = -68.208, Detta Lon = 121.476
Corpscon v6.0.1, U.S. Army Corps of Engineers
FIELD:
TRANSMITTAL LETTER CHECKLIST
WELL NAME: Sea l�!f'(,c�
PTD: Zj -7 �/ I S
Development _ Service Exploratory V Stratigraphic Test _ Non -Conventional
POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No. , API No. 50- _-
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69)
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-
-� from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occ .
ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals„
a
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company— Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well I" are
also required for this well:��T(�j ��/
`
Well Logging
Requirements
Gk lld�/�
az
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
r7
ti
I Lz ))
- - - - - - - [XluO AOleroldxa] syodai SseAcud Apigem to; auogd/oweu loe;060
6E
OdS 'L ma!ne9S;o 6u!ppnds of loud 00E)OV
ale0
00
ale0
aauo!ss!wwo0 .9jeQ :jau0lsslww00
04101 POPlnad aq lsnw el!s pup aql;o aouejealo In;ss000ns aleilsuowep legl seleool gpOn woq uo!leluawnoop PUB sol04d
- - SGA
o!lgnd
LCI
6uuaaw6u3 016010a0
- - - 69£9 -LLL 1u!pzzelN - d'Joeit oo'sleas 6u!ddell'anlsualxo u!elu000l paloadxa lou ;oog Ol sluaw!pas - -
- - - SOA
- - - - - - - [XluO AOleroldxa] syodai SseAcud Apigem to; auogd/oweu loe;060
6E
- - -
`aW ,Oi39 le leo5 a g;!M pale!oosse aue4law (wdd 000'LL) sl!un gg pun0; 1. �auu0'.00L -,OOS-mwlaueglaw - -
- - -
HN
- - - - - - 910 s O i AsAlns ud I Uoo a ea -
- - - - - - - - - - - ( 4 -g 1.) 9.P P q S
8E
LLOZ/9ZIL Ois
-"((udd 009Z) sl!Un £L pue'OIN,OOS =.004 iu04 aue4law-(INdd 009L) SI!un g'aW ,OOb 019¢6 aue4law;o - - "
- - SGA
- - - - - - - " " " " - - - - - - - - - - - - - - --saooz"SOO molleys;o sisRleue 0!wslaS
LCI
ale(] jddV
- - - (Wdd 00y) sliun Z Pa6w9ne ll 'sanmo SeB aled1woo !sow seg !lam Aolejoldxe L jnoneapu3-paloedxe auON - - -
saA
- - - - - - - - - - " - - - - - - - - - - ssuoz alnssaldlaAO lei.1 ualod uo poluosafd ele0
9£'
R601009
- - - 'sagw £� l-uigl!m paleool lle'sllam"/Uolejoldxa-L id loyOuV g °L monBapu3 I l jauu0 06 paseq PelOadxa suON - - -
SaA
- - - - - - - - - " - - - " - " " - sasiseaw opglns ua6oapAq o/m panssi aq ueo 1!uu9d
9E
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - -
- -- VN
- - - --RIua flam 001n1as Jod Paluan 210V U! M sIIam 10 uo! i uooIe01ue da W
bE
ON
algegojd saB SZH;o aouasaid sl
E£
- au!13 bol pue jalem gl!m peon .. llam II!jp II!m
saA
- - - - - - - - - - - um0pings uogejedo lnogl!m M000 II!m )POM
Z£
..
VN
- ... (b9 Leal) £9-d8 IdV/m sa!ldwoo p!oguew aL!o40
L£
- - -
VN
- - - - - (sivawwoo u! B!sd Intl)-ol isal :aleudoldde 6UgeJ sold-3doe
OE
VN
- - - - - - - - - - uopelnft leaw Aa4l oP's3d08
6Z
L1,0Z/L/9 SID
1o; 11e 6uisn -
SOA
- - - alenbepe Is!l dlnbe g ogewagos wej5ad pint; 6u!ll!jo
9Z
oleo jddV
- - 'aouoeld- 6u!pup Ilam jalem u0wwo0 'duel of esoy-PUB Peag 6u!lelou a buish -
- - - - VN
- "swillmn5eu leaw 1! seop'pannbef jayan!p)t
LZ
- - 'Pw Il009 ue41 /adaep ou -..,Ilam leo!yeA
- - SGA
- - - - - pesodwd-uopejadas ajogpam alenbapV
9Z
- - - - - - - -
VN
- panwdde uaaq luawuopuege jb; gob-ol. a se4'llPp-a� a JI
9Z
- - - - - - s6upino jo; duel a 6u!sN - -
SeA
- - - - - - - - - - - i!d avasap io a6eluelalenbapVbZ
- - - -
VN
-- - lsoyeuuetl gg'y'0 po; elenbape SU61SOP Bu!se0
£Z
- - - - -
VN
- " " - - - - - --suozuo4 anponpoid-umouN lle janoo ll!M 1W0
ZZ
- -
VI4
-6so yns of BUMS Owl u! -ail of aienbape lon 1W0
LZ
- - -
- VN
. . . . . . ... .... . 6so yns g jolonpuoo uo alelnw!o Ol-aienbape Ion JW0
OZ
- - las 6u!seo aoeyns ou '..HO aiogl!am aneal-II!M
VN
. . . . .......- - - - - - - smash UMOUN pe sloal0rd Bu!seo aoepnS
6L
Buuaeul6u3
- - - - - - - - - - - - - - - - 'g 091-00 Is las aq of jolonpuob .9/9 9
SGA
. . . . . . ....... . . - pap!nad-Owls lolonpuo0
9L
- - - - VN (Lluo IIaM a0loas iod) sgluow 6 uegl ssal Uo!>0npa -ai;o uogeinp Uoloe w paonpmd-aid g L
- - - - - - - - - -
VN
(.Cluo IIaM ao!nLas J0d) papRuap! ma!nal;oeale al!w qh; u!gl!M sIISM Iltl
5 L
- - - - - - -
VN
Tod) (sluawwoo L! #O!lnd) #7aWp uo!l0aful-Rg pazu0gine eleJ)s pue ease Ulyllm paleool IIaM
YL
- - - - - - - - -
SO),...item
Aep-SL ajo;aq panbjdde eq 11Ullad ueo
£L
- - - - - - - - - - - - - - - -sleoo glim pale!oosse-paloadxo e1e aue4law - - -
9aA
- - - - - lenwdde an!lejis!u!wpa inogl!m panss! aq UeO l!uuad
Zl.
LL0Z/ZZ/8 OdS
- - - - - - - - - - - 10 Slunowe Ilews RluO •wd 96nlag a41 ;o leoo pue auOISAelo'auolsllis'auolspues pappBg
- - - saA
- - - - - - - - - - - - - japio uogemasuoo 1n0gi!m panssl aq ueo I!UUad
L L
oleo iddV
-jalu!Xlu!4l a41 u!411M al 4oea1 PUB Isgsodap auulsnoel PUB le!0e16 w Aelo V Vs 41!m papPaq
- - - - SGA
- - - 90jol ui puoq aleudmdde seg joleiad0
OL
. - - - -jalu! PUSS o!1elewol6uoo"g PueS;o slapnbe gs!Aoejq RIl46ps of gsa5; "almlaued lliM L melAeaS
- SaA
- - - - - - - f ,md paloage 6luo jolejadO
6
- - - - - ,MN a4l ol,009'Z lnoge peleool aq ll!m'g ma!neGg'llom palelai-se6 to--p0lsweau agl - -
- VN
- - - - - - - - - - papnlou!leld ajogllam s! 'Pa1e!n9P 11
9
'MNN Bill of AO£' L
saA
- - - - - - 1!un 6u!(lup-u! algel!ene BOSOMS lua!OWIS
L
- sap 11 -L ma!neaS;o alluw q/L u!41!M uigl!m (deep ,b6) Ilam jalem paja4s!6ai molleg3 I Si ata4.L -
SOA
- - - - - - - - - sham ja4lo woy aouelslp jadoad paleool IIaM
9
- - - - - - - 'L 'id-jogouV }lam (Uoleloldxe RVgd io M AOL'£ all l!!M',OL Rq .S£ a aq II!M Sale paloedwl
- SO),
- - - - --Aepunoq l!un 6wpup woo aouels!p iadoad palL30i 110M
9
- - - - '.Oepunoq Xyadosd lewalxa agl wo4 ,9Z paleool aq ll!M paM •amlowls o!6oloeB molleys - - -
- ON
- - - - - - - - - - lood pougap a-ul paleool Hem
b
- - - - - - alep!len of Ilam!Sal leil9'le0!yen'(OAl/oW,009)Mope4s-ABA iagwnu llam anb!un
saA
- - - - - - - - - iagwnu pue eWeu 116m anb!un
£
- - - - •pap!Aold:;Z/g'iwod luasuo0 uaumopue1 pauft agllo Xdooe epAcud WOOM palsanbaa : LZ/L -
SeA
- - - - - - - aleudoldde lagwnu asea7
Z
- - - - - ...... •L99Z6E NoV s! 90epnsgns :6eM-Jo-1g6i8 9dN s! aoephS
VN
- - - - P940BUB aa; limed
L
- - - - - - - - - - - -
- VN
- - (a-VZ"D'(V'L'D0£0'S0`LES'd of suu0;u00 sB6'uanUOOuoN
LL
uo!lensiu!wpy
lesods!o jelnuuV -----LrO ajogS go/u0 Auh eeiVoaO�� adAljsselo le!l!ul 0l d80UTR 6uedwo0 0£LLLLZ:#Old
bas woq IIaM _ - 81S ww6wd L M31AV3 :aweN IIaM -"— _ — -- — - load g Pla!d 1S11303HO 11W113d 113M