Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout217-113aid -(t3 a g�a�l Davies, Stephen F (CED) a �� From: Davies, Stephen F (CED) Sent: Monday, December 16, 2019 9:03 AM To: Seth Nolan Cc: Guhl, Meredith D (DOA); Carlisle, Samantha J (CED) Subject: RE: Miss Labeled Electronic Dataset Attachments: TRANS MITTAL_2171130_Seaview-7_81ank_DVD_20191213.pdf Hi Seth, The DVD that Hilcorp provided on December 13" containing replacement digital well log data for Seaview 7 is blank. I checked and confirmed this using two different PCs. Would you all please provide another DVD containing the Seaview 7 data? Attached is a copy of the transmittal letter that accompanied the blank DVD. Thank you, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviesCDalaska.gov. From: Davies, Stephen F (CED) Sent: Wednesday, December 11, 2019 9:52 AM To: Seth Nolan <snolan@hilcorp.com> Cc: Guhl, Meredith D (DOA) <meredith.guhl@alaska.gov>; Carlisle, Samantha J (CED) <samantha.carlisle@alaska.gov> Subject: Miss Labeled Electronic Dataset Seth, While working through the data from Hilcorp's Seaview wells, I noticed that one set of data submitted for Seaview 7 (AOGCC e -Set No. T28836) actually contains the following data recorded in Seaview 6. Name Hilcorp_Alaska_Seaview_6_LAS.Ias ® Hilcorp Seaview_6 480ft_TD_2in Field Lithology_Log,pdf 1 Hilcorp Seaview_6 48Oft_TD_2in_Field Lithology_Log.tif ® Hilcorp Seaview 6 48Oft_TD_5in_Field_Lithology_Log,pdf Lam: Hilcorp Seaview_6 480ft_TD_5in Field_LithoIogy_Log,tif Date modified Type Size 9/21/2017 4:47 P M LAS File 267 9,211-'2017 4:47 PM Adobe Acrobat D... 224 9/25,12017 2:25 PM TIF File 632 9/21:2'174:47 PM Adobe Acrobat D.- 302 9/25/20172:25 PM TIF File 661 I checked the Batas for Seaview 6 to see if the labels had inadvertently been switched, but no, the data shown above is also included in the collection for Seaview 6 (T28835). I also checked all other datasets that were logged in at AOGCC at about that same time, but I did not find the above data for Seaview 7. So, could Hilcorp please submit the .las, .pdf, and Alf files similar to those above for Seaview 7? Thank you, Steve Davies Debra Oudean Hilcorp Alaska, LLC GeoTech 3800 Centerpoint Drive Anchorage, AK 99503 Tele: 907 777-8337 Hilrn�p MaA., I.M. Fax: 907 777-8510 E-mail: doudean@hilcorp.com DATE 12/11/2019 To: AOGCC Natural Resources Technician 333 W 7th Ave Ste 100 Anchorage, AK 99501 EdW J Hilcorp Alaska Seaview 7_LAS 9/1.12017 7:29 AM Hilcorp_Seaview_7 320ftTD 2in_Field_Lit... 9/25120172:24 PM Hilcorp Seaview_7_32M TD 2in_Field Lit... 8/29/26176:24 PM Hilcorp Seaview_7 320ft_TD_5in_Field _Lit ... 9/25/20172:22 PM o. Hilcorp_5ea%iew7_320ftTD_5in_Field Lit... V29120176:24 PM .J Seavi._w 7 Mair•, Pass 9.11/2017 4:06 PM Seaview7 9/1/20174:06 PM fh Seaview7 9/25/20172:22 PM LAS File 176 KB TIF File 529 KB PDF Document 93 KB TIF File 541 KS PDF Document 117 KB LAS File 34 KB PDF Document 892 KB TIF File 4,778 KB Please include current contact information if different from above. /Z.c \,4� , / Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Receive By: L Date: /2 /� i� DATA SUBMITTAL COMPLIANCE REPORT 10/28/2019 Permit to Drill 2171130 Well Name/No. SEAVIEW 7 Operator Hilcorp Alaska LLC API No. 50-231-20059-00.00 MD 322 TVD 322 Completion Date 9/11/2017 Completion Status INFO Current Status P&A UIC No REQUIRED INFORMATION U44A -Mvd Log _M e5 Samples Uil 2 S V, Directional Survey Yes DATA INFORMATION List of Logs Obtained: GR -CCL, Lithology Well Log Information: Log/ Interval CHI Electr Data Digital Dataset Type Med/Frmt Number Name ED C 28704 Digital Data ED C 28704 Digital Data ED C 28704 Digital Data Log C 28704 Log Header Scans Log C 28836 Mud Log ED C 28836 Digital Data ED C 28836 Digital Data ED C 28836 Digital Data ED C 28836 Digital Data ED C 28836 Digital Data Log C 28836 Log Header Scans Well Cores/Samples Information: Name (from Master Well Data/Logs) Log Log Run Interval CHI Scale Media No Start Stop CH Received Comments 322 2 10/17/2017 Electronic Data Set, Filename: Seaview 7 Main Pass.las 10/17/2017 Electronic File: Seaview 7.pdf 10/17/2017 Electronic File: Seaview 7.tif 0 0 2171130 SEAVIEW 7 LOG HEADERS 2 10 320 10/17/2017 2 Lithology Logs 10 320 10/17/2017 Electronic Data Set, Filename: H i Icorp_Alaska_Seaview_7_LAS.las 10/17/2017 Electronic File: H i I corp_Seavi ew_7_320ft_T D_5i n_Field_Litholog y_Log.tif 10/17/2017 Electronic File: H i I co rp_Seaview_7_320ft_T D_2i n_Fi eld_Litholog y_Log.pdf 10/17/2017 Electronic File: H i I co rp_Seaview_7_320ft_T D_2i n_Fi eld_Litholog y_Log.tif 10/17/2017 Electronic File: H i I corp_Seaview_7_320ft_T D_5i n_Field_L ith o log y_Log.pdf 0 0 2171130 SEAVIEW 7 LOG HEADERS Sample Interval Set Start Stop Sent Received Number Comments AOG(C Page I oft Monday. October 28. 2019 d D a a E O U `o 0 0 O /"� 0 O p O Z VQ\x Y Y Y N a in m m Q a Z a o Z L L p FL U a m Q o a no 0 o m U U J ¢ � V a a � ¢ N " NrN FL m CL J m U p m O W a O a a Q m W0) n O w N E LL E " a " / V U i O LL N N m O 0 E J E Z Z " w m Q " ° °m J C O " J a n E 5 li O U U U C � c o G o N � 000 0 E ¢ m U N O O U Z C J Y Y y E Q c oO E o N E U r � 0 m G m Q � m 0 U O 2 C) a Z — a r m (� e - N r Q � Y Y C 0 m O n ~ o W E n O 2 p - " 0 2 d — a O a `/� x K a ~ m W U m D tia c O r N N f Q C O p Z Q o O D O " a m 0 0 J o. o. E m E H LL o' O 0 O O N a O O 6 U d C7 U U K U d D a a E O U `o Guhl, Meredith D (CED) From: Frank, Kevin J (DNR) Sent: Friday, October 11, 2019 8:57 AM To: Guhl, Meredith D (CED) Subject: Re: Seaview 7, PTD 217-113, Extended Confidentiality? Hi Meredith No there has been no such request made. Thanks for checking. Cheers, Kevin's n Get Outlook for iOS From: Guhl, Meredith D (CED) <meredith.guhl@alaska.gov> Sent: Friday, October 11, 2019 8:36:52 AM To: Frank, Kevin 1 (DNR) <kevin.frank@alaska.gov> Subject: Seaview 7, PTD 217-113, Extended Confidentiality? Hi Kevin, Has Hilcorp requested extended confidentiality for Seaview 7 strat test well, due for release after today, October 11, 2019? Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 mered ith.gu h I @a laska.eov Direct: (907) 793-1235 CONFIDENTIALITYNOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.¢uhl@alaska.¢ov. H IliLwrp Ah.A.. LLC DATE 08/22/2018 25 Seth Nolan Hilcorp Alaska, LLC GeoTech II 3800 Centerpoint Drive Anchorage, AK 99503 Tele: 907 777-8308 Fax: 907 777-8510 E-mail: snolan@hilcorp.com CONHOENTIAL RECUVED To: Alaska Oil & Gas Conservation CommissWO LONGER Meredith Guhl CONFIDENTIAL Petroleum Geology Assistant 333 W 7th Ave Ste 100 OCT 1 1 2019 Anchorage, AK 99501 SEAVIEW STRATIGRAPHIC TESTS WELL SAMPLE INTERVAL Seaview 7 30' -J30f1 Wgotal samples) Please include current contact information if different from above. AUG 2 2 2018 AOGCC Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Date: 6 ( 2 3 Guhl, Meredith D (DOA) From: Cody Dinger <cdinger@hilcorp.com> Sent: Thursday, December 7, 2017 7:46 AM To: Guhl, Meredith D (DOA) Cc: Davies, Stephen F (DOA) Subject: FW: Formations at TD for Pearl & Seaview Strat Test Wells Hi Meredith, Here are the formations at TD below. Thanks, Cody From: David Buthman Sent: Thursday, December 07, 2017 7:18 AM To: Cody Dinger <cdinger@hilcorp.com> Subject: RE: Formations at TD for Pearl & Seaview Strat Test Wells Hi Cody, Here's the formations at TD listing, below. Rgds, Dave Formation at TD: Strat Test Well Name Formation at TD Pearl 1A Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Pearl Upper Middle Sterling Seaview 1 Beluga Seaview 2 Beluga Seaview 3 Beluga Seaview 4 Beluga Seaview 5 Beluga Seaview 6 Beluga Upper Miu..,e Seaview 7 Sterling DB 12/7/2017 From: Cody Dinger Sent: Tuesday, December 05, 2017 11:28 AM To: David Buthman <dbuthman@hilcorp.com> Subject: FW: Formations at TO for Pearl & Seaview Strat Test Wells Any thoughts on this? From: Guhl, Meredith D (DOA) imaitto:meredith.auhl@alaska.eov) Sent: Tuesday, December 05, 2017 11:26 AM To: Cody Dinger <cdinter@hilcorp.com> Cc: Davies, Stephen F (DOA) <steve.davies@alaska.gov> Subject: Formations at TO for Pearl & Seaview Strat Test Wells Hello Cody, I'm starting a review of the data received for the Pearl and Seaview strat test wells (all 14 of them). One of the initial issues I've noticed is none of the 10-407 forms have a formation listed at TD in Box 29. Could you please provide, at minimum, the formation at TD for all Pearl and Seaview wells. Thank you, Meredith Meredith Guhl Petroleum Geology Assistant Alaska Oil and Gas Conservation Commission 333 W. 7th Ave, Anchorage, AK 99501 meredith.guhl@alaska.¢ov Direct: (907) 793-1235 CONFIDENTWITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Meredith Guhl at 907-793-1235 or meredith.euhl@alaska.eov. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1a. Well Status: Oil ❑ Gas E] SPLUG ❑ Other ❑ Abandoned 0 Suspended❑ 20AAC 25.105 20MC 25.110 GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 1b. Well Class: Development ❑ Exploratory ❑ Service ❑ Stratigraphic Test ❑✓ 2. Operator Name: Hilcorp Alaska, LLC 6. Date Comp., Susp., or Abend.: 9/11/2017 14. Permit to Drill Number / Sundry. 217-113 3. Address: 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 7. Data Spudded: August 28, 2017 • 15. API Number: 50-231-20059-00-00 4a. Location of Well (Governmental Section): Surface: 656' FSL, 2462' FEL, Sec 9, T5S, R15W, SM, AK Top of Productive Interval: N/A Total Depth: 656' FSL, 2462' FEL, Sec 9, T5S, RI 5W, SM, AK 8. Date TD Reached: August 29, 2017 16. Well Name and Number: Seaview 7 9. Ref Elevations: KB: pA/l, GL:238.29' BF: N/A 44 i 17. Field / Pool(s): N/A 10. Plug Back Depth MDf VD: Surface 18. Property Designation: KPB ROW/ ADL 392667 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 160814.3199 • y- 2106353.39 Zone- 4 TPI: x- y- Zone- Total Depth: x- 160814.3199 y- 2106353.39 Zone- 4 11. Total Depth MDfrVD: • 322'/ 322' • 19. DNR Approval Number: N/A 12. SSSV Depth MDYTVD: N/A 20. Thickness of Permafrost MD/TVD: N/A 5. Directional or Inclination Survey: Yes (attached) No Q Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) I 21. Re-drill/Lateral Top Window MD1TVD: N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR -CCL 2" MD, Lithology Log 2"/5" MD • RECEIVED SEP 2 5 2017 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MHOLE SIZE CEMENTING RECORD D SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM PULLED 6-5/8" 17# A53B 20' 260' 20' 260' 6" 26 sx bentonite grout to P&A 24. Open to production or injection? Yes ❑ No Q If Yes, list each interval open (MDf rVD of Top and Bottom; Perforation Size and Number; Date Perfd): A �9a-'gtyu t,2RfiF'i-E-�•F�JPI' DA: rE I/1111 -T_ VERIFIED 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MDrrVD) N/A 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes No Per 20 AAC 25.283 (1)(2) attach electronic and printed information DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: N/A Method of Operation (Flowing, gas lift, etc.): N/A Date of Test: Hours Tested: Production for Test Period Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Flow Tubing Press. Casing Press: I Calculated 24 -Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity -API (corr): M" UIVIb i Form 1007 Revised 512017 � /03/7 TI ED ON PAGE 2 tL � � � 1 Submit ORIGINAL onl%�,, 28. CORE DATA Conventional Core(s): Yes ❑ No ❑� • Sidewall Cores: Yes ❑ No Q If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� ` If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Permafrost - Base Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval N/A information, including reports, per 20 AAC 25.071. Formation at total depth: /Y vo�G�e NCt 31. List of Attachments: Wellbore Schematic, Drilling Reports, As Built Drawing, P&A Photos Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: Paul Mazzolini Contact Name: Cody Dinger Authorized Title: Drilling Manager Contact Email: cclin er Q hIICOr .Com Authorized n 04�z5 Contact Phone: 777-8389 �2A Signature: p r� 41 Date: 1 7 INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitdnite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 0 cora Afmka. LLC 6-5iR- TD = 322'/ TVD = 322' Wellbore Schematic Casing Detail Location Anchor Point Well Seaview 7 PTD: 217-113 API: 50-231-20059-00-00 Size Type Wt Grade Conn. ID Top Btm 6-5/8" Surf Csg 17 A -53B Weld 6.125" 20' 260' . Drilling Info Hole Section Casing 6" 6-5/8" x OH Updated by CJD 09/25/2017 U Well Name: Stratigraphic Test Wells Field: Ninilchik County/State: , Alaska (LAT/LONG): avation (RKB): API M Spud Date: Job Name: 1741287 Seaview 7 Contractor AFE M 1741287 AFE $: Hilcorp Energy Company Composite Report R PRIM- ops summa 8/28/2017 MIRU. Move rig to Seaview 7. Spot tank, rig, pipe truck. Post permit and well sign.;Drill and drive 6-518" casing to 200'. 8/29/2017 MIRU, spot pipe truck.;Drill and drive 6-5/8" from 220' to 260'.;Drill 6" hoie from 260' to 322' TD. RDMO. 9/1/2017 MIRU Pollard Eline. PU GR and CBL tools. Log Well. Tag @ 322'. 9/11/2017 MIRU Kraxberger drilling. Spot rig over well and pipe truck. Pick up pipe cutter and RIH on 20' of drill pipe. Pressure up on cutter and rotate, good indication of cut. POOH, inspect cutting tool.;Good. Cut @ 22'. PU 16 joints of 1" tubing and RIH. Tag bottom and begin mixing and pumping grout. Pump 26 sx of Bentonite Grout ull 5 its every 8 sx pumped. Good returns to surface.;LD all tubing and put back on truck. Pull cut casing joint and lay down. Clean up site. Well P&A'd. RDMO. AS -BUILT: SEAVIEW 7 NOTES: 1. COORDINATES SHOWN ARE BASED UPON DIFFERENTIALLY CORRECTED GPS OBSERVATIONS. 2. AS—BUILT SURVEY CONDUCTED SEPTEMBER 18, 2017. 3. ALL DISTANCES ARE IN U.S. SURVEY FEET. 4. SURVEYED NAVD88 (G12B) GROUND ELEVATION OF SEAVIEW 7 = 238.29' LEGEND: O• AS—BUILT WELL LOCATION, NO CASING VISIBLE AS -BUILT SEAVIEW 7: LOCATED WITHIN SECTION 9, T5S, R15W, SM, AK SPCS NAD27 AK Z4N: LAT= 59'45'10.81070"N LONG= 151'50'21.61202"W N= 2,106,353.39' E= 160,814.32' OWNER: KENAI PENINSULA BOROUGH 0 100 200 FEET SCALE OF AkgSI�� *: 49TH '. ��.... .. y'. MICHAEL R. EW 1 ajf. LS -11794 ,moi ROFESSION AVVP�O+�� -N- i \T55 16 i VICINITY MAP: 1" = 1 Mile SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. RFCO1V /` TT RECON, LLC 1 481 W. RECON CIR. PALMER, AK 99645 1 DATE: 9/20/2017 1 DRAWING: HilcorpDeepAsBuilt_Seaview I SHEET: 1 OF 1 I REV: LOT 4 DPHASE SEAVIEW 7 > • 0 ED N Z LOT 5 LOT 6 SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS—BUILT EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. RFCO1V /` TT RECON, LLC 1 481 W. RECON CIR. PALMER, AK 99645 1 DATE: 9/20/2017 1 DRAWING: HilcorpDeepAsBuilt_Seaview I SHEET: 1 OF 1 I REV: , �,' x �,t$ e'i '` �a .�'�i` "�,. rye` �,✓(r4.� ��� �� a f r� °�� . _} ! 3 yj y� 5 —+.S (. M1 9.?n. } 4 ,• t'YP � �' . .� SY 444 i' '1� �t. � $t i ' `"� � '}r a i ♦ , ?d r lT ajjx�^�'°.b �a ,�, f �irr bid r ,/'rl. , I 4jreM'11. r •{� t 'F ? y r. i 4t' F �{ 'kY ��.�w 4 1P � N � 'J�d51 (�`� „�Y yY.,�i,P J y �r�A r.�,J }(•� r �''.r i �rT k Wife, X ' re AJ t.�?�✓ 1 _ �,I Y J ("� � � ■s-� Y f � < � if yi � � a �y � pmt .,V� � y<- �_')�� a .�, , KY � t > a I • ^ yL � � v � it xt .' F r �rlr ; L#�StA yam. ? , '� 3�3�Y.� �(,yd�� 1 F y<At 14 t�9 a l� F��4- A�., '� �-�1 �+{ 1 9 '['Kyptr' ,t 1� 1 i • J < .� ��.t ri%rA�a � iF ✓:"} i-� d wF� , V. P : �� . ',,! r i '' � ,f '''-r rr � � �.J tY�"y ..}�` t �,� d` A j e.': � r 1 er'ar ,., rvr, y ''< ^g� � 4* •. �F' `i.� .�<y- �< <y ?1 + -�"' x SPA<`'4 �� is 'r Y • A r'♦`,1� � f r yi r. ✓n If o"ff `� lTp y t. i1 n " , a i `..�, t i �� r rl�1T •}<r �r"r � cyj ��+ r.ia.>J�.. :.: Q' �T4 L v.� !b' ♦! r'€ 555 .0 'tL` !'.R , y �.+`: rj ';y� } "' -� 34ee�r'�� ��ry � H ' i t r� ' 4 ♦ � r. E 4i` of �r � T�'+ r A s+ P E +'1, l fi 1. t i f { i r 44r 'Vrd'• (x•� � ti, �{f .r�� . Yj4'�r• �� r, < ��' p � .�� 2�rt sfl U - iA�f . �,- o.{_ `, 's° tit rt D wt Aj ♦# tori �a�U sr� t � s +! ,� H 31 r Y., � A� i�.i x a}. PA r�� �. r'i�` q i �,. 1 iY2',•r 1"�ySyy ;olp�^yp���ry ; �L. �(� v h ,�'' ver +.�jh r S` � a n DATE 09/25/2017 Seth Nolan GeoTech II RECEIVED OCT 17 2017 AOGCC Hilcorp Alaska, LLC 3800 Centerpoint Drive Anchorage, AK 99503 Tele: 907 777-8308 Fax: 907 777-8510 E-mail: snolan@hilcorp.com To: Alaska Oil & Gas Conservation Commission Makana Bender Natural Resource Technician 333 W 7th Ave Ste 100 Anchorage, AK 99501 CD in 217-107 Log prints and data Prints: Seaview 1: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 17 1 0 7 2 8 6 9 8 Seaview 2: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1 7 1 0 8 2 8 6 9 9 Seaview 3: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1 7 1 0 9 2 8 7 0 0 Seaview 4: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1 7 1 1 0 2 8 7 0 1 Seaview 5: GR -CCL 2" MD, Lithology Log 2"/5" MD 2 1 7 1 1 1 28 7 0 2 2 1 7 1 1 2 28 7 0 3 Seaview 6: GR -CCL 2" MD, Lithology Log 2"/5" MD Seaview 7: GR -CCL 2" MD, Lithology Log 2'y5" MD 2 1 7 1 1 3 28 7 0 4 Cl): 1 Electric logs Seaview 1 9/25/2017 2:28 PM File folder Seaview 2 9/25/2017 2:28 PM File folder Seaview 3 9/25/2017 2:29 PM File folder Seaview 4 9/25/2017 2:29 PM File folder Seaview 5 9/25/2017 2:29 PM File folder Seaview 6 9/25/2017 2:29 PM File folder . Seaview 7 9/25/2017 2:29 PM File folder Please include current contact information if different from above. zC`6 3(�c Please acknowledge receipt by signing and returning one copy of this transmittal or FAX to 907 777.8510 Received Bv., . _ - 11 1 Date: Davies, Stephen F (DOA) From: Davies, Stephen F (DOA) Sent: Tuesday, August 29, 2017 11:09 AM To: Paul Mazzolini; Cody Dinger; Cody Terrell; Keegan Fleming - (C) Cc: Quick, Michael J (DOA); Bettis, Patricia K (DOA); Bender, Makana K (DOA); Guhl, Meredith D (DOA) Subject: Incorrect API Numbers for Seaview Wells I owe you all an apology: the API numbers that I assigned to the Seaview stratigraphic test wells are incorrect. I used the USGS Quad code for the Kenai Quadrangle (133) rather than the correct code for the Seldovia Quadrangle (231). The next five digits to the right of the quad code in each API number are sequential, so the corrected API numbers will be completely different, as shown below. We are currently correcting this error in the AOGCC's databases, in well postings on AOGCC's website, and in the AOGCC's paper records. Please accept my apology for the efforts that Hilcorp must expend to correct its paper and electronic records. A copy of this email will be placed in each of the above well files at the AOGCC to minimize future confusion. The incorrect API numbers will not be re -used. Let me know if you have any questions or comments. Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.eov. Current, Incorrect API Permit Operator Well Name Number Correct API Number 2171070 HILCORP SEAVIEW 1 50133206730000 50231200530000 2171080 HILCORP SEAVIEW 2 50133206740000 50231200540000 2171090 HILCORP SEAVIEW 3 50133206750000 50231200550000 2171100 HILCORP SEAVIEW 4 50133206760000 50231200560000 2171110 HILCORP SEAVIEW 5 50133206770000 50231200570000 2171120 HILCORP SEAVIEW 6 50133206780000 50231200580000 2171130 HILCORP SEAVIEW 7 50133206790000 50231200590000 We are currently correcting this error in the AOGCC's databases, in well postings on AOGCC's website, and in the AOGCC's paper records. Please accept my apology for the efforts that Hilcorp must expend to correct its paper and electronic records. A copy of this email will be placed in each of the above well files at the AOGCC to minimize future confusion. The incorrect API numbers will not be re -used. Let me know if you have any questions or comments. Steve Davies Senior Petroleum Geologist Alaska Oil and Gas Conservation Commission (AOGCC) CONFIDENTIALITY NOTICE., This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.eov. THE STATE Alaska Oil and Gas °fALASKA Conservation Commission GOVERNOR BILL WALKER Paul Mazzolini Drilling Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Re: Exploratory Field, Exploratory Pool, Seaview 7 Hilcorp Alaska, LLC Permit to Drill Number: 217-113 Surface Location: 590' FSL, 2519' FEL, SEC. 9, T5S, RI 5W, SM, AK Bottomhole Location: 590' FSL, 2519' FEL, SEC. 9, T5S, RI 5W, SM, AK Dear Mr. Mazzolini: Enclosed is the approved application for permit to drill the above referenced stratigraphic test. Hilcorp Alaska, LLC (Hilcorp) requests the following variances: 1. Hilcorp's request to waive wellbore surveys is APPROVED. The well depth is very shallow (600 feet) and intent is to drill vertically. 2. Hilcorp's request to use standard water well drilling equipment that is commonly used in the area is APPROVED under 20 AAC 25.037. The drilling rig will also use air instead of drilling mud to remove cuttings which is also common. Due to shallow depth and nature of the area conventional well control equipment is not needed or practical. Rig will use a rotating head and large hose to direct returns to a tank. 3. Use of a diverter is WAIVED due to the shallow depth of the wellbore. As stated above a rotating head system will be used as an alternate method of directing returns safely during drilling operations. 4. Requirement under 20 AAC 25.120 to place a well abandonment marker on the casing stub is WAIVED. 5. Hilcorp's request to use grout instead of cement to P&A wells is APPROVED. Grout is commonly used to abandon water wells. Additional Conditions of Approval: 1. Portable gas detection monitor (LEL) to be used on site. (minimum of 2 handheld meters) 2. Well may not be drilled any deeper than 600feet without written approval from the AOGCC. 3. Photo document P&A operations: including casing cutoff, grout top and site clearance. 4. Transfer of wellbore to landowner for use as water well must be approved by AOGCC as per 20 AAC 25.140 Permit to Drill: 217-113 Page 2 of 2 Dry ditch sample sets submitted to the AOGCC must be in no greater than 30' sample intervals. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by Hilcorp in the attached application, the following well logs are also required for this well: Lithology log required in lieu of mud log. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Photos and documentation from utility locates that demonstrate successful clearance of the drill site must be provided to the AOGCC prior to spudding of Seaview 7. This permit to drill does not exempt you from obtaining additional permits or approvals required by law from other governmental agencies, and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. A weekly status report is required from the time the well is spudded until it is suspended or plugged and abandoned. The report should be a generalized synopsis of the week's activities and is exclusively for the AOGCC's internal use. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Hollis S. French Chair DATED this Z3 day of August, 2017. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMlboION PERMIT TO DRILL 9n AAr. 95 nnr 1 a. Type of Work: Drill 0 • Lateral ❑ Redrill ❑ Reentry ❑ 1b. Proposed Well Class: Exploratory - Gas ❑ Stratigraphic Test ❑� • Development -Oil ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - WAG ❑ Service - Disp ❑ Service - Winj ❑ Single Zone ❑ Service - Supply ❑ Multiple Zone ❑ 1 c. Specify if well is proposed for: Coalbed Gas ❑ Gas Hydrates ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: Hilcorp Alaska, LLC 5. Bond: Blanket ❑, - Single Well ❑ Bond No. 022035244 • 11. Well Name and Number: Seaview 7 - 3. Address: 3800 Centerpoint Drive, Suite 1400, Anchorage, AK 99503 6. Proposed Depth: MD: 600' - TVD: 600' 12. Field/Pool(s): N/A 4a. Location of Well (Governmental Section): Surface: 590' FSL, 2519' FEL, Sec 9, T5S, R15W, SM, AK Top of Productive Horizon: Total Depth: 590' FSL, 2519' FEL, Sec 9, TSS, R15W, SM, AK 7. Property Designation: Surface: KPB ROW/ Subsurface: ADL 392667 - 8. DNR Approval Number: NA 13. Approximate Spud Date: 8/5/2017 9. Acres in ProDerty: NA Platted 14. Distance to Nearest PreDeft 28' 4b. Location of Well (State Base Plane Coordinates - NAD 27): Surface: x- 160,814.13' y- 2,106,348.84' Zone -4 10. KB Elevation above MSL (ft): 242.55 ' GL / BF Elevation above MSL (ft): 238.55 15. Distance to Nearest Well Open to Same Pool: N/A 16. Deviated wells: Kickoff depth: N/A feet Maximum Hole Angle: N/A degrees 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Downhole: 0-15 Surface: 0 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 6" 6 5/8" 17 A-53 Weld 150' Surface Surface 150' 150' 19. PRESENT WELL CONDITION SUMMARY (To be completed far Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate iLa Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes❑ No ❑+ 20. Attachments: Property Plat ❑, BOP Sketch ❑ Drilling Program Time v. Depth Plot ❑ Shallow Hazard Analysis[] Diverter Sketch ❑ Seabed Report ❑ Drilling Fluid Program ❑ 20 AAC 25.050 requirements[] 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Paul Mazzolini Authorized Name: Paul Mazzolini Contact Email: mazz0 int hilcor . Authorized Title: Drilling Manager Contact Phone: 777-8369 r '7113 Authorized Signature: Date: z,0! Commission Use Only Permit to Drill {�( Number: Z1 �- �`✓ • API Numbe : 50- � '� �-C/� Permit Approval ^ Date: a. 1 1 See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed ethane, gas hydrates, or gas contained in shales: ly —/ Other. 1'ij 2 , `� Samples sures: Yes No,❑,// Mud log req'd: Yes[] Nov GL �j'tCnS �- L-+��r HzS measures: Yes ❑ NoL—d/ Directional svy sures: Yes❑ No Spacing exception req'd: Yes ❑ Nolte Inclination -only svy req'd: Yes[] Nola/ Lc �t.(-,:-F-i p•.,. -f 67 �o p rp v Post initial injection MIT req'd: Yes❑ No❑ /e10tur d APPROVED BY +(/� (6 Approved by: \ COMMISSIONER THE COMMISSION Date: I A'� Submit Form and Form 10-401 Revised 512017 aiR 1,14A rhonths from the date of approval per 20 AAC 25.005(8) Attachments in Duplicate 1 !ll��lll ����.... "� 6-2_z• 1'7 0 Hilmrp Alaska, LLC. 07/13/2017 Paul Mazzolini Drilling Manager Commissioner Alaska Oil & Gas Conservation Commission 333 W. 71" Avenue Anchorage, Alaska 99501 Re: Kenai Peninsula Shallow Stratigraphic Test Well Program Seaview 7 Dear Commissioner, Hilcorp Alaska, LLC P.O. Box 244027 Anchorage, AK 99524-4027 Tel 907 777 8369 Email pmazzolini@hilcorp.com RECEIVE® ,JUL 14 7.017 AOGCC Enclosed for review and approval is the Permit to Drill for the Seaview 7 shallow stratigraphic test well located near Ninilchik, AK. Seaview 7 is one of the remaining 10 - 14 shallow vertical stratigraphic test wells to be drilled and evaluated in the area between Ninilchik and Anchor Point on the southern Kenai Peninsula. The plan is to begin drilling operations on or about August 5, 2017. The goal of the shallow stratigraphic test well program is to penetrate 1-3 shallow coal seams and evaluate this shallow wellbore with gamma ray and resistivity logs. A dipmeter log could also be run if requested by Geology to aid in the evaluation of the stratigraphic test well. Hilcorp will utilize a very experienced water well contractor on the Kenai Peninsula that will utilize best practices for the drilling of the shallow stratigraphic test wells. Hilcorp Alaska, LLC requests a variance from 20 AAC 25.035 (d) for utilizing diverter while drilling the shallow wells required for the stratigraphic test well program. The basis for this variance is information gathered by Hilcorp Sr. Geologist, David Buthman containing the shallowest gas shows and well test information from offset wells in the three areas to be targeted by the stratigraphic well test program. Hilcorp Alaska, LLC also requests a variance from 20AAC 25.050 for obtaining wellbore surveys due to the very shallow wells being drilled for the stratigraphic test program.' A sign will be posted at each drilling location with the well information required by AOGCC. The shallow stratigraphic test wells will be drilled with air and the cuttings will be captured in a tank as per AAb 20 7 u Q, 25.047. Samples of these cuttings will be obtained every 30' for analysis. The cuttings will be sent to Kenai Gas Field for disposal at G&I or to the Kenai Peninsula Borough landfill (authorization to do so has been obtained). Once drilled and evaluated the wells will be plugged utilizing grout and cut off 10' below GL to complete the P&A. It is possible that some of the landowners may want to complete wells as a water source, in which case 20 AAC 25.140 requirements will be followed. Approvals from surface landowners have been obtained prior to surveying, staking and preparation of the site for each stratigraphic test well. These approvals are included as an attachment with each PTD application. Care has been taken to place drilling locations near access roads and to minimize location site preparation by utilizing a 35'x 70' footprint. If you have any questions, please don't hesitate to contact me at 777-8369 (office) or 317-1275 (mobile). Suer Paul Mazzolilini Drilling Manager Hilcorp Alaska, LLC Page 1 of 1 6-5/8,, 6" Hole N corp AWkp LLC YY�HSQOIr�pUH i � PROPOSED WELLBORE Casing Detail Location Anchor Point Well Seaview 7 PTD: TBD API: TBD Size Type Wt Grade Conn. ID Top Btm 6-5/8" Surf Csg 17 A-53 Weld 6" Surf 150' Drilling Info Updated by CJD 06/9/2017 Hole Section Casing 6-5/8" 6" x OH Updated by CJD 06/9/2017 Shallow Stratigraphic Test Well Plan Seaview 7 1. MIRU truck mounted drilling unit with support equipment onto 35' x 70' location. 2. Drive 6 5/8" casing through upper 100'-150' due to unstable hole conditions - 3. Drill 6" vertical hole until one of 3 distinct coal seams is penetrated 500'- 600'. Base case is to air drill hole to TD. a. Samples to be gathered every 30' for geological review. b. A lithology log will be generated. 4. Once 6" hole drilled to TD, fill with freshwater or viscosified water to keep hole full for logging, approx. 21 bbls for gauge hole to 600' (.035 bbl/ft). 5. Remove cuttings from cuttings tank and haul to G&I in Kenai Gas Field for disposal or to Kenai Borough Landfill. (21 bbls /hole) 6. RDMO truck mounted drilling unit and support equipment. Move to next strat test well location. 7. Rig up logging unit and log 6" hole with Gamma / Resistivity. Geologist may request a dipmeter be run. 8. Rig down logging unit and move to next strat well. 9. MIRU truck mounted drilling unit with support equipment. 10. RIH with tubing and spot grout/ bentonite plug from TD to surface. 11. Set surface grout/ bentonite plug within 10' of surface, cut and remove 10' of 6 5/8" casing. Fill in hole. No welded cap on 6 5/8" casing as per waiver from AOGCC. 12. RDMO truck mounted drilling unit and support equipment. 13. No welded cap is required on 6-5/8" surface casing per waiver from AOGCC. 14. Portable gas detectors will be placed at the Drillers console and at the cuttings tank. - 15. A lithology log will be generated and submitted to the AOGCC. Stratigraphic Test Well Program Project Description The Hilcorp Alaska, LLC stratigraphic test well program will be performed from June -December of 2017, and possibly into Q1 of 2018 depending on the ability to build packed snow and ice roads into the locations located in swampy areas. Hilcorp anticipates drilling 16-20 stratigraphic test wells, each up to 600' deep that will be drilled and evaluated on the southern end of the Kenai. Peninsula between Ninilchik and Anchor Point. The areas have been named Seaview (near Anchor Point), Pearl (near Ninilchik) and Deep Creek (for the inland locations about 5 miles south of the Happy Valley gas field). These stratigraphic test wells intend to penetrate 1-3 shallow coal seams within 500'-600' from surface. Once.these coal seams have been penetrated each stratigraphic hole will be filled with freshwater and logged with gamma ray and resistivity tools on a single run. Hilcorp geologists may determine that a dipmeter log also be obtained in some of the stratigraphic test wells. The chosen contractor is very experienced in drilling wells within this shallow hole sectionyon the Kenai Peninsula and will use air drilling to drill the stratigraphic test wells to depth. Best practices will be utilized to drill and abandon these shallow stratigraphic test wells. Casing will be required in the top. 100' —150' of hole due to formation instability issues and will be drilled into place. The cuttings generated from the air drilling operations will be captured in a tank and samples will be obtained approximately every 30'. These cuttings will be hauled to the G&I Facility in the Kenai Gas Field for disposal or taken to the Kenai Peninsula Borough landfill. After each test well has been evaluated, it will be plugged with grout/bentonite mixture as required to meet regulatory requirements. Once a grout plug has been set to within 10' of surface, the casing will be cutoff and the hole buried to complete the P&A of each stratigraphic test well. Once all drilling and data evaluation work has been completed, all locations will be cleaned up to the individual land owners satisfaction. Permission will be obtained from each land owner for all activities on their property to include surveying, site preparation, drilling activities, and data collection/evaluation of each stratigraphic test well. Thestratigraphic test well locations were chosen to minimize impact to the surface owners. The area required for each stratigraphic test well is approximately 35'.x 70'. Should soil conditions require, rig mats will be set in place to provide the drill rig unit and support equipment.a firm and stable work surface. The locations have been placed near established roads and tight of ways to minimize the length of any additionally needed access roads. Four locations in the Deep Creek area will require packed snow and ice roads to access swampy areas so that drilling and evaluation,work will be completed in Q4 2017 or Q12018, once the ground has sufficiently frozen. Work for the Q4 2017 / Q12018 stratigrabhic test wells will be completed in the same manner as those drilled and evaluated during the summer. (COO NRDENVUL 8 May 2017 Alaska Oil and Gas Commission ATTN: Steve Davies Hilcorp Alaska, LLC ATTN: Paul Mazzolini RE: Shallow Stratigraphic Test Well Program Geologic Hazard Analysis Hilcorp Alaska, LLC has analyzed nearby oil and gas test wells, water wells, nearby gas producing wells, and seismic data on the southern Kenai Peninsula and do not anticipate any shallow gas at depths between 500' and 850' for the Stratigraphic Test Well Program. Therefore a waiver is requested for utilizing a diverter that is typical on deeper drilling oil and gas operations. The information that follows was utilized to determine the need for the diverter to drill the shallow stratigraphic test wells. Hilcorp Alaska, LLC is planning on drilling shallow stratigraphic test wells in three areas: Ninilchik, Deep Creek Unit, and Anchor Point. For each of these areas, geotechnical evidence indicates no shallow hazards. M. Guhl 10/29/2019 4 5 HALUIBUR'TUN Dawrlpdcn 0var6dru,,atdI0n RWCH-12345678 135.007b9 Weak Point 10000 lbs - 12345678 0.01 lbs GTET-12345678 165.00 Its 0 SP Ring -12345678 0.00 lbs Cabbage Head - 12345678 10.00 lbs TOOL STRING DIAGRAM: GTET.XRMI-ACRT O.D. Diagram sensors @DOW9 92.310 in -0 93.625 in I 00.010 Ire 0 93.625 in --R 9 3.625 in* --0 03 ' 625 in 05.000 In �rreedv Tvp1 Name RWCH Releasable Wireline Cable Head WP10K Weak Point 10000 lbs GTET Gamma Telemeby Tool XRMI XRMI Navigation - Insite XRMI_I XRMI Imager-.Insite ACRt Airily Compensated True Resistivity Instrument Section ACRt Array Compensated True Resistivity Sonde Section Sp SP Ring RSGF Regal Standoff 6.75in CBHD Cabbage Head Total Data: GTET-XRMI-ACRT *- Fishing Neck@59.18ft Lcad Cell Q 5638 ft E-_ BH Temperature Q 55.81 it -( Qo 53-35 it E.. GammaRayQ47.75ft ,! SP@1.88ft Length A` ilea 60.06 H 6.25 ft 53,57 st 8.528 it 0.56 ft 0.681 0.00 ft serial Weight Length ypwd Number (Ihs) (ft) 00 &MI 12345678 135.00 6,25 53.81 300.00 12345678 0.01 0.01 * 54.61 300.00 12345678 165.00 8.52 45.29 60.00 12345678 290.00 14.30 30.99 moo 12345678 206.00 11.16 19.83 30.00 12345678 50.00 5.03 14.80 120.00 12345678 200.00 14.22 0.5B 120.00 12345678 0.00 0.25 1.86 300.00 11111111 20.00 0.52 * iota@ 300.60 12345678 10.00 0.58 0.06 306.00 1,076.01 60.06 * Not included In Total Length and Length Accumulation. Date: 03 -May -1717:02:12 RWCH-12345678 135.00 it. Weak Point 10000lbs- 1234567B 0.01 His GTET-12345678 165.00 Ibs XRMl4Instrument- 12345678 MOM lb. XRMI-1 Mandrel - 12345578 206.00 its Bell Naso -12345678 5.08lb. Ai.auldb a ptriemenlo Tool Name Number RWCH' Re leasable Wireline WP19R Weak Point GTET Gamma TelemetryT XRM( XR 11 N.avi9ation=ln XRMI-I XRMI Imager-Insite BLNS Bull Nose 25,79 BH Temperature 939.31 it Total 280.00 14.30 +-1 I. M TOOL STRING DIAGRAM : GTET-XRMI Mennen Sensors Delays Ai.auldb a 8114w Tool Name Number 40,56 ft 62.310 in lead 12345678 FishingNeck @39,68ft 34.31 UX 300.00 03.625 In 0.01 0.01 Load Cell( a} 36.66 ft C-25 5ft 12845678 165.00 8.52 25,79 BH Temperature 939.31 it 12345fi78 280.00 14.30 69.919 in' �0 30,00 12345678 206.00 11.16 0.33 80.00 12945678 5.00 0.33 O.OU 34.31 ft 801.01 40.56 ZP.ccelemmeter@33.Bfift 63,625 in __`. 64.500 in -.I 65.009 in ---). 64500 in -0 62.750 in .---j EE GammaRay@23.25 it Pads 204, 5@3.10ft Pads 1, 3, S Q2.87 ft 8.52 ft 14.30 Jt aft 11,16 ft 0:33 ff 0.337 Unit - Seim Y[llbs) t 1 (11) l - 1 8114w Tool Name Number . lead 12345678 135.00 825 34.31 UX 300.00 is 12345878 0.01 0.01 35-'11 300.00 12845678 165.00 8.52 25,79 60.60 12345fi78 280.00 14.30 ' v A -p 30,00 12345678 206.00 11.16 0.33 80.00 12945678 5.00 0.33 O.OU 300.00 801.01 40.56 included in Total Length and Length Accumulation. ' Data: 03-May.1716:18:07 U) C) CD 00 x 0 b.0 CD C CO 0 lj� N N x m 00 x 1 00 x U CY) U -STAKED NOTES: 1. COORDINATES SHOWN ARE BASED UPON DIFFERENTIALLY CORRECTED GPS OBSERVATIONS. 2. AS -STAKED SURVEY CONDUCTED MAY 23, 2017. 3. ALL DISTANCES ARE IN U.S. SURVEY FEET. 4. SURVEYED NAVD88 (G128) ELEVATION OF SEAVIEW 7 = 238.55' - LEGEND: 0 SET BRASS CAP MONUMENT ON 5/8" X 30" REBAR AS—STAKED SEAVIEW 7: LOCATED WITHIN SECTION 9, TSS, R15W, SM, AK SPCS NAD27 AK 24N: LAT= 59'45'10.76583"N LONG= 151'50'21.61320"W N= 2,106,348.84'- E= 160,814.13' SPCS NAD83 AK Z4N: LAT= 59'45'08.56178"N LONG= 151'50'29.39235"W N= 2,106,105.37' E= 1,300,839.33'. OWNER: KENAI PENINSULA BOROUGH 0 100 200 FEET La� SCALE *: �9 TH P'. MICHAEL WE I : Q AW ESSIONNLta���Zr North SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -STAKED EXHIBIT REPRESENTS A.SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. RICON, LLC �OST �iE 481 W. RECON CIR. 11Y PALMER, AK 99645 OT 2 OLSON HILLS LOT 4 PHASE ONE LOT 3 o RO ND o SEAVIEW 7 O�SpN 0 NARRY 0 m D w U LOT 8 z OT 5 U z LOT 7 LOT 6 \ SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAT I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OF ALASKA AND THAT THIS AS -STAKED EXHIBIT REPRESENTS A.SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. RICON, LLC �OST �iE 481 W. RECON CIR. 11Y PALMER, AK 99645 Davies, Stephen F (DOA) From: Cody Terrell <cterrell@hilcorp.com> Sent: Monday, August 21, 2017 9:28 AM To: Davies, Stephen F (DOA) Cc: Cody Dinger; Paul Mazzolini Subject: Seaview 7 Strat Test KPB Permit Attachments: Seaview 07 KPB Permit 17-129P 8-2-17.pdf Steve, See attached KPB permit for Seaview 7 strat test well. Regards, Cody T. Terrell I Landman I Hilcorp Alaska, LLC O: 907-777-8432 1 C: 713-870-4532 1 cterrell(a-)hilcorp.com 3800 Centerpoint Dr., Suite 1400 1 Anchorage I Alaska 199503 This email may contain confidential and / or privileged information and is intended for the recipient(s) only. In the event you receive this message in error, please notify me and delete the message. Road Service Area 47140 E. Poppy Lane • Soldotna, Alaska 99669 (907) 262-4427 office, (907) 262-6090 lax www.borough.kenai.ak.us/roads R.O.W. PERMIT - PROJECT SPECIFIC MIKE NAVARRE BOROUGH MAYOR 'This permit Is to be completed by the RSA Director' ❑Road Construction ®Other: Drilling project - data gathering Category of Road: WA Width WA Length NIA Road Names: Harry Olson Rd Region/Unit: South 3 Applicant Name: Hillcorp Alaska LLC Contractor: Kraxberger Drilling Inspector Name: Jed Painter ,m RSA Phone # 262-4427 The uired to call the Ins or for a minimum of 5Inspections: For all Road Construction 4p as fabric being plae . -24d when the first Iiti (less then 121nches deep acted. 3n° when next Illt Is being compacted. 4r^ for substantial comp!5111 In a punch list of Items to complete •Note -As required by KPB ruction Standards: -Road Construction shall meet or exceed all curr tandards. Exceptions must be Pre-afoprovedBoard or RSA Director and noted on -Due to soil complexities the RSA recommends perms enlist icensed road construction contractor and/or engineer. -It is the applicant's responsibility to determine then acgmr local, state, or federal permits and to ensure all construction activity complies with all federal, s laws. -It is the appli si dity to survey the proposed Right -of -Way for construction and property Iota ed road and all utilities in -0 -Way. RSA Special Provisions: Applicant proposes to place a drill rig near the westerly terminus of Harry Olson Road for the purpose of gathering data. Project is temporary, planned to span a period between 8.18 and 9-8, 2017. Schedule may be adjusted as necessary, but in any case will adhere to project specifications cited in attached application. RSA Special Provisions: Contact Road Inspector prior to start of work. 1. Drill outside of road prism if possible. 2. If drilling through road prism cannot be avoided, make road repairs before leaving site. 3. Coordinate with local residents affected to ensure adequate access during times of necessary road closure. Approved: ® Denied: ❑ Revoked: ❑ Permit # - 17-9 mi Issue Date: 8.2-17 Permit Expires: 9.30.17 By RSA Director Date: 8-2.17 Date approved by RSA Board (if required): NIA Regulation of Traffic Flow During Construction: Permit holder may regulate traffic by (signage! regulatory device/ barricade) during hours of: As required during daylight hours from (date) 8.18.17 to (date) 9-30-17 KENAI PENINSULA BOROUGH AUG 01 7017 I �P', Road Service Area L'�B- 47140 E. Poppy Lane • Soldotna. Alaska 99669 Toll-free within the Borough: 1-800-478-4427 Road Service Area PHONE. (907) 262-4427 . FAX (907) 262-6090 y www.kpb us PROJECT SPECIFIC RIGHT-OF-WAY (ROW) CONSTRUCTION PERMIT APPLICATION FIRoad Construction Project Other (Excluding Driveways) Please List: Drilling Project - data gathering, temporary use 1-1 Existing Road Upgrade ❑ New Road Construction Road Construction Not 'Alternate Design F -I -Engineered Design 'Category IV Rd to KPB 14.06 Standards (These reouire Prior RSA board approval before construction) It is the applicant's responsibility to determine the need for any other local, state or federal permits and acquire the same. Similarly, it is the applicant's responsibility to ensure all construction activity complies with all Federal, State, and Local laws. APPLICANT NAME: Hilcorp Alaska, LLC APPLICANT MAILINGADDRESS:3800 "e'n}erpoinL} Dr' CITY: Anchorage STATE TELEPHONE: 907-777-8432 CELL Hone CONTRACTOR NAME:' `raxbe'rge'r Drilling 02 99503 ZIP: 907-777-8580 ROAD NAME. Harry Olson Road SUBDIVISION: Olson HIIIS Phase One EMAIL:cterrell@hilcorp.com REGIONIUNIT(DetermmedbyRSA) 53 APPROXIMATE START DA 08/18/17 APPROXIMATE COMPLETION DATE. 09/08/17 Revised 9212016 Page I or 4 REQUIRED ATTACHMENTS: OTHER ATTACHMENTS: lir apoicabler ❑✓ Attachment A (page 4) ❑Engineering Design Preliminary Plat or Final Plat ❑Other Government Agency Map Applications/Permits F]As-Built Survey Where information provided by existing topographic maps, aerial photography, and photographs is inadequate to accurately reflect conditions of the right-of-way or potential problems created or exacerbated by construction, additional information, surveys, or engineering analysis may be required prior to issuance of a permit. TRAFFIC FLOW: Applicant may request authority to regulate traffic: nYesn No during the following hours of the day on the following dates: during project (8-18- to 9 -PI - ) Applicant shall provide signage and safeguards in accordance with the Alaska Traffic Manual and shall obtain any further permission for such routing from appropriate entities including but not limited to fire, emergency medical, police, and school transportation agencies. Road passage or alternate access must be maintained or provided to residents at all times. WATER BODIES: (KPB 14.40.061) All floodplains, floodways, wetlands, streams lakes, or other water bodies adjacent to or within 50 feet of the outer boundaries of the right-of-way must be clearly delineated on a map attached to application. Are water bodies as described above present within 50 feet of right-of- way? DYes Ft✓ No. Development conditions for rights-of-way accessing water bodies. No development within 100 feet of the high water mark of a waterbody within a right-of-way providing access to the waterbody may occur without a permit. All permits issued under this section shall be submitted to the RSA Board for its consideration. If applicable, date and Resolution No. of RSA Board approval Right-of-way construction permits pursuant to KPB 14.40.040-14.40.060 will not be issued to construct any part of a road or driveway or other development within the right-of-way where the construction or development will be parallel and within 100 feet of the ordinary high water mark of a watercourse or lake unless necessary for access to a lot where no reasonable alternative access exists or unless the road is for access to a bridge or public facility, waterbody, or watercourse. Construction will ❑✓ will not occur within 100 feet of the ordinary high water mark of a watercourse. Pursuant to KPB 14.40.040-14.40.060 for waterbody crossings where a dedication crosses a waterbody catalogued as important to the protection of anadromous fish under AS 41.14.870(a) as now enacted or hereinafter amended, applicants must provide completed application for project permits to the United States Army Corps of Engineers and RevIse0 9212015 Page 2 W 4 Alaska Department of Fish and Game Division of Habitat. Anadromous waterbody crossings must be designed by a licensed civil engineer and submitted to the RSA Board for review and approval prior to construction. Designs must comply with KPB 14.40.061 requirements. US Army Corp of Engineers Project Permit No. Issued on AK Dept. of Fish & Game Permit No. Issued on ✓ Construction does not cross dedicated catalogued waterbody as described above. THE KENAI PENINSULA BOROUGH SPECIFICALLY DISCLAIMS ANY WARRANTY OR LIABILITY REGARDING LOCATION OR COORDINATION WITH UTILITY COMPANIES. Statement of Applicant: I hereby affirm and agree that the work necessary to bring the project described herein to applicable roads standards as described in KPB 14.06 will be, or has been completed, to follow all permit requirements contained herein, in KPB 14.40 and Attachment B "Mandatory Conditions'. By signing this application I certify that all the information provided above is true and accurate to the best of my knowledge that I am the responsible party for all project construction and that I am responsible for all communication with the Road Service Area (RSA). I further acknowledge and agree that any violation of a permit condition or failure to obtain a permit for work in a ROW is subject to a civil penalty of up to 300 per day pursuant to KPB 14.40.380. 7-.�ii- r7 cant Date INDEMNIFICATION: By signing this application, I hereby acknowledge that the permittee shall indemnify, defend, and hold and save the borough, its elected and appointed officers, agents and employees harmless from any and all claims, demands, suits, or liability of any nature, kind or character including costs, expenses, and attorneys fees. The permittee shall be responsible under this clause for any and all legal actions or claims of any character arising from applicant or applicant's agents' performance or failure to perform this permit in any way whatsoever. This defense and indemnification responsibility includes claims alleging acts or omissions of the borough or its agents, which are said to have contributed to the losses, failure, violations, or damages. KPB 14.40.060. 7 -o4 -r of Applicant Date Pursuant to KPB 14.40.060(c), this permit may be subject to additional conditions to protect and manage borough ROWS by preventing damage to ROWs and adjacent public and private properties or waterbodies. This Permit may be revoked at any time for the Borough's convenience or for failure to comply with requirements herein, KPB code, or other applicable local, state, or federal law. Incomplete permit forms will be returned to applicants. Will Road Maintenance be requested? FlYes V/IN If yes, a separate Road Maintenance Application must be submitted by September 151 for consideration that calendar year. Revised &214016 Page 3 o14 RSA RIGHT-OF-WAY CONSTRUCTION PROJECT DESCRIIPTION ATTACHMENT A (Pursuant to KPB Chapter 14.40.050) PROJECT DESCRIPTION: (use extra pages if necessary) 1. Brief narrative of construction plans: Pro6ect is planned to last 5-10 days beginning Aug.18 2017 to Sep 8 2017 Schedule may be adjusted final spud date is TBD. 2. Proposed design and method of construction: NIA. Site use will be temporary 3. Statement of length and width of project and right-of-way to be constructed: N/A. Site use will be temporary. 4. Approximate grade of natural terrain and final grade of proposed construction: NIA. 5. Soil conditions of area subject to construction:___ Gravel Road, 6. Identify all properties affected, served or accessed by the proposed construction, provide owner name and parcel numbers: 7. Brief narrative of construction plans: N/A. Site use will be temporary and no permanent modifications are planned. Site will be returned to pre -drilling conditions immediately following drilling operations. 8. Proposed uses after construction: N/A. Site use will be temporary and no permanent modifications are planned. Site will be returned to pre -drilling conditions immediately following drilling operations. Revised 9121/2016 Page 4 of 4 S -STAKED! S. ROJECT LOCniFO IN SC[ 9, i 5 S. R 15 W. S.M. " ANCHOR PONT NOIES: s -2 I. COORDINATES SHOWN ARE BASED UPON Ci ,i DIFFERENTIALLY CORRECTED GPS OBSERVATIONS. l 2. AS -STAKED SURVEY CONDUCTED MAY 23, 2017. 3. ALL DISTANCES ARE IN U.S SURVEY FEET.t- 4. SURVEYED NAVD88 (G128) ELEVATION OF SEAVIEW 7 = 238.55' - S�}y 1-R•. "e• - 11 9 ip SEAV IN 7 T` �l LEGEND: rss isi5;_`1'=' _ fE SET BRASS CAP MONUMENT ON VICINITY MAP: 1" - 1 Mile 5/8" X 30" REBAR AS—STAKED SEATAEW 7 LOCATED WITHIN SECTION 9. TSS. R15W. SM, AK SPCS NAD27 AK Z4N: LAT= 59'45'10.76583"N LONG= 151'50'21.61320"W N= 2.106,348.84' E= 160,814.13' SPCS NA083 AK Z4N: LAT= 59'45'08.56178"N LONG= 151'50'29.39235'W N= 2,106,105.37' E= 1,300.839.33' OWNER: KENAI PENINSULA BOROUGH 0 100 200 FEET SCALE TH -.-MICHAEL R.EWIN7, LS -11794 .•,c;'i North I Te' z OT A OLSON HILLS PHASE ONE LOT 3 11 0 0 HARRY _ .. W,I LOT E z K LOT 5 U I a I Lor s LOT I i\ SURVEYOR'S CERTIFICATE: I HEREBY CERTIFY THAI I AM REGISTERED AND LICENSED TO PRACTICE LAND SURVEYING IN THE STATE OE ALASKA AND THAT THIS AS -STAKED EXHIBIT REPRESENTS A SURVEY MADE BY ME OR UNDER MY DIRECT SUPERVISION. DIMENSIONS AND OTHER DETAILS ARE CORRECT TO THE BEST OF MY KNOWLEDGE. R ICON , DATE: 5/30/2017 I DRAWING: HllcorpDeepAsSloked-2 I SHEET: 1 OF 1 1REV: 0 Z-17- !l3 Davies, Stephen F (DOA) From: Cody Dinger <cdinger@hilcorp.com> Sent: Sunday, August 13, 2017 2:05 PM To: Davies, Stephen F (DOA) Cc: Paul Mazzolini; Schwartz, Guy L (DOA) Subject: Seaview Locates Attachments: Re: Seaview Locates No Conflict; Document to S Davies Locate Photos Seaview.pdf Steve, I have attached documentation of utility locates per our Conditions of Approval to drill the Seaview stratigraphic test wells. Please give me a call if you need further information. Thanks, Cody Dinger 509-768-8196 Steve, Here are the locate photos for Seaview 1,2,3,4,5,7. 1 have attached an email from Enstar indicating no conflict on wells except Seaview 4 (we are still about 40' from any gas lines). Thanks, Cody Dinger 509-768-8196 Seaview 7 11770 ri 3 a N Y w a I�I11�-II Ili _' � 1111 ,111,1 All uuq �i ul,,• II 1111 111111 � % 111111 1.1111 Il 11. ,11'11 .111111' ,,,' 111111111IIIII III 1: 1111111�� /i �', 1111 II,III II' 1 111 �- '. I11I11',11 111111 11111 . t������ 111111 1111111 III 1• % 1/Z G�� � 1'1111111 111111111111111111111111111'111111111,1 X111 1111111111111111 1111 g ',�� �����A v`♦♦ 1111111111111111111111111111111�1111 g 1 �` 111 1 111 1111 111 I 1 1 1 I / � • ` . \ 11111 111 111 1 I 1 ® 1 I 1 L O ti 0 A T J J ❑ NO n W N N O # n � A r L � J C W 3 30 = a a A a ry Q I�I11�-II Ili _' � 1111 ,111,1 All uuq �i ul,,• II 1111 111111 � % 111111 1.1111 Il 11. ,11'11 .111111' ,,,' 111111111IIIII III 1: 1111111�� /i �', 1111 II,III II' 1 111 �- '. I11I11',11 111111 11111 . t������ 111111 1111111 III 1• % 1/Z G�� � 1'1111111 111111111111111111111111111'111111111,1 X111 1111111111111111 1111 g ',�� �����A v`♦♦ 1111111111111111111111111111111�1111 g 1 �` 111 1 111 1111 111 I 1 1 1 I / � • ` . \ 11111 111 111 1 I 1 ® 1 I 1 L O ti 0 A T J J ❑ NO K 71 R A t 3 m = a a A ry Q ryJ t A S 'J Z 4O. 31000❑000 0 ❑❑❑❑❑❑❑❑❑ K 71 i' m .1 i Zf7-/�3 Davies, Stephen F (DOA) From: Cody Terrell <cterrell@hilcorp.com> Sent: Friday, July 21, 2017 11:40 AM To: Davies, Stephen F (DOA) Cc: Paul Mazzolini; Cody Dinger; Keegan Fleming Subject: RE: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed Yes, Seaview 3, 6, & 7 are all on KPB ROW. We are waiting on approval by KPB. 1 will send approvals your way ASAP. Regards, Cody T. Terrell Landman Hilcorp Alaska, LLC Direct: 907-777-8432 Cell: 713-870-4532 From: Davies, Stephen F (DOA) [mailto:steve.davies@alaska.gov] Sent: Friday, July 21, 2017 9:11 AM To: Cody Terrell <cterrell@hilcorp.com> Subject: RE: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed Thank you Cody. The AOGCC will also need the landowner approvals for Seaview 3, 6, and 7 before the Permits to Drill can be granted. I assume that these are located on land owned by the Kenai Peninsula Borough or by the State. Correct? Regards, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies(@alaska.gov. From: Cody Terrell [mailto:cterrell@hilcorp.com] Sent: Friday, July 21, 2017 7:59 AM To: Davies, Stephen F (DOA) <steve davies alaska.gov> Subject: RE: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed Steve, 1 attached to this email the surface owner approval for Seaview 1, along with the remaining private land owner approvals. Please let me know if you need anything else. Regards, Cody T. Terrell Landman Hilcorp Alaska, LLC Direct: 907-777-8432 Cell: 713-870-4532 From: Davies, Stephen F (DOA) [mailto:steve.davies(@alaska.gov) Sent: Thursday, July 20, 2017 5:42 PM To: Cody Terrell <cterrell@hilcorp.com> Subject: Seaview 1 (PTD #217-107) - Landowner and Surface Owner Approvals Needed Cody, I'm reviewing Hilcorp's Permit to Drill application for the Seaview 1 well, which reports an approximate spud date of July 24th. According to the Property Designation box on the application form, this well will be located on private property. According to the cover letter accompanying Hilcorp's application: "Approvals from surface landowners have been obtained prior to surveying, staking and preparation of the site for each stratigrophic test well. These approvals are included as an attachment with each PTO application." A copy of the landowner and surface owner approval was not attached to the Seaview 1 application. Could Hilcorp please provide copies of these approvals to the AOGCC? The Permit to Drill for Seaview 1 cannot be granted without these approvals. Thanks, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.davies@alaska.gov. Remark: AOGCC Permit to Drill 26 July 2017 INPUT Geographic, NAD27 OUTPUT State Plane, NAD27 5004 -Alaska 4, U.S. Feet SEAVIEW 7 1/1 Latitude: 59 45 10.76583 Northing1r. 2106348.837 Longitude: 151 50 21.61320 Easting/X: 160814.134 Convergence: -1 35 20.65986 Scale Factor: 1.000030941 Corpscon v6.0.1, U.S. Army Corps of Engineers Remark: ITSZr141PON Permit to Drill 26 July 2017 INPUT OUTPUT Geographic, NAD27 Geographic, NAD27 SEAVIEW 7 v1 Latitude: 59 45 10.76583 Latitude: 59.752990506 Longitude: 151 50 21.61320 Longitude: 151.839337000 Corpscon v6.0.1, U.S. Army Corps of Engineers AOGCC Permit to Drill 26 July 2017 INPUT Geographic, NAD27 I OUTPUT Geographic, NAD83 Accuracies of conversions from NAD 27 to NAD 83 are typically 12 to 18 cm. SEAVIEW 7 111 Latitude: 59 45 10.76583 Latitude: 59 45 08.56178 Longitude: 151 50 21.61320 Longitude: 151 50 29.39235 Datum Shift (m.): Delta Lat. = -68.208, Delta Lon = 121.476 Remark: Corpscon v6.0.1, U.S. Army Corps of Engineers Remark: AOGCC Permit to Drill 26 July 2017 INPUT OUTPUT Geographic, NAD27 Geographic, NAD83 Accuracies of conversions from NAD 27 to NAD 83 are typically 12 to 18 cm. SEAVIEW 7 111 Latitude: 59 45 10.76583 Latitude: 59.752378273 Longitude:151 50 21.61320 Longitude: 151.841497874 Datum Shift (m.): Delta Lat. = -68.208, Detta Lon = 121.476 Corpscon v6.0.1, U.S. Army Corps of Engineers FIELD: TRANSMITTAL LETTER CHECKLIST WELL NAME: Sea l�!f'(,c� PTD: Zj -7 �/ I S Development _ Service Exploratory V Stratigraphic Test _ Non -Conventional POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No. , API No. 50- _- (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69) In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occ . ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals„ a Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company— Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well I" are also required for this well:��T(�j ��/ ` Well Logging Requirements Gk lld�/� az Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 r7 ti I Lz )) - - - - - - - [XluO AOleroldxa] syodai SseAcud Apigem to; auogd/oweu loe;060 6E OdS 'L ma!ne9S;o 6u!ppnds of loud 00E)OV ale0 00 ale0 aauo!ss!wwo0 .9jeQ :jau0lsslww00 04101 POPlnad aq lsnw el!s pup aql;o aouejealo In;ss000ns aleilsuowep legl seleool gpOn woq uo!leluawnoop PUB sol04d - - SGA o!lgnd LCI 6uuaaw6u3 016010a0 - - - 69£9 -LLL 1u!pzzelN - d'Joeit oo'sleas 6u!ddell'anlsualxo u!elu000l paloadxa lou ;oog Ol sluaw!pas - - - - - SOA - - - - - - - [XluO AOleroldxa] syodai SseAcud Apigem to; auogd/oweu loe;060 6E - - - `aW ,Oi39 le leo5 a g;!M pale!oosse aue4law (wdd 000'LL) sl!un gg pun0; 1. �auu0'.00L -,OOS-mwlaueglaw - - - - - HN - - - - - - 910 s O i AsAlns ud I Uoo a ea - - - - - - - - - - - - ( 4 -g 1.) 9.P P q S 8E LLOZ/9ZIL Ois -"((udd 009Z) sl!Un £L pue'OIN,OOS =.004 iu04 aue4law-(INdd 009L) SI!un g'aW ,OOb 019¢6 aue4law;o - - " - - SGA - - - - - - - " " " " - - - - - - - - - - - - - - --saooz"SOO molleys;o sisRleue 0!wslaS LCI ale(] jddV - - - (Wdd 00y) sliun Z Pa6w9ne ll 'sanmo SeB aled1woo !sow seg !lam Aolejoldxe L jnoneapu3-paloedxe auON - - - saA - - - - - - - - - - " - - - - - - - - - - ssuoz alnssaldlaAO lei.1 ualod uo poluosafd ele0 9£' R601009 - - - 'sagw £� l-uigl!m paleool lle'sllam"/Uolejoldxa-L id loyOuV g °L monBapu3 I l jauu0 06 paseq PelOadxa suON - - - SaA - - - - - - - - - " - - - " - " " - sasiseaw opglns ua6oapAq o/m panssi aq ueo 1!uu9d 9E - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- VN - - - --RIua flam 001n1as Jod Paluan 210V U! M sIIam 10 uo! i uooIe01ue da W bE ON algegojd saB SZH;o aouasaid sl E£ - au!13 bol pue jalem gl!m peon .. llam II!jp II!m saA - - - - - - - - - - - um0pings uogejedo lnogl!m M000 II!m )POM Z£ .. VN - ... (b9 Leal) £9-d8 IdV/m sa!ldwoo p!oguew aL!o40 L£ - - - VN - - - - - (sivawwoo u! B!sd Intl)-ol isal :aleudoldde 6UgeJ sold-3doe OE VN - - - - - - - - - - uopelnft leaw Aa4l oP's3d08 6Z L1,0Z/L/9 SID 1o; 11e 6uisn - SOA - - - alenbepe Is!l dlnbe g ogewagos wej5ad pint; 6u!ll!jo 9Z oleo jddV - - 'aouoeld- 6u!pup Ilam jalem u0wwo0 'duel of esoy-PUB Peag 6u!lelou a buish - - - - - VN - "swillmn5eu leaw 1! seop'pannbef jayan!p)t LZ - - 'Pw Il009 ue41 /adaep ou -..,Ilam leo!yeA - - SGA - - - - - pesodwd-uopejadas ajogpam alenbapV 9Z - - - - - - - - VN - panwdde uaaq luawuopuege jb; gob-ol. a se4'llPp-a� a JI 9Z - - - - - - s6upino jo; duel a 6u!sN - - SeA - - - - - - - - - - - i!d avasap io a6eluelalenbapVbZ - - - - VN -- - lsoyeuuetl gg'y'0 po; elenbape SU61SOP Bu!se0 £Z - - - - - VN - " " - - - - - --suozuo4 anponpoid-umouN lle janoo ll!M 1W0 ZZ - - VI4 -6so yns of BUMS Owl u! -ail of aienbape lon 1W0 LZ - - - - VN . . . . . . ... .... . 6so yns g jolonpuoo uo alelnw!o Ol-aienbape Ion JW0 OZ - - las 6u!seo aoeyns ou '..HO aiogl!am aneal-II!M VN . . . . .......- - - - - - - smash UMOUN pe sloal0rd Bu!seo aoepnS 6L Buuaeul6u3 - - - - - - - - - - - - - - - - 'g 091-00 Is las aq of jolonpuob .9/9 9 SGA . . . . . . ....... . . - pap!nad-Owls lolonpuo0 9L - - - - VN (Lluo IIaM a0loas iod) sgluow 6 uegl ssal Uo!>0npa -ai;o uogeinp Uoloe w paonpmd-aid g L - - - - - - - - - - VN (.Cluo IIaM ao!nLas J0d) papRuap! ma!nal;oeale al!w qh; u!gl!M sIISM Iltl 5 L - - - - - - - VN Tod) (sluawwoo L! #O!lnd) #7aWp uo!l0aful-Rg pazu0gine eleJ)s pue ease Ulyllm paleool IIaM YL - - - - - - - - - SO),...item Aep-SL ajo;aq panbjdde eq 11Ullad ueo £L - - - - - - - - - - - - - - - -sleoo glim pale!oosse-paloadxo e1e aue4law - - - 9aA - - - - - lenwdde an!lejis!u!wpa inogl!m panss! aq UeO l!uuad Zl. LL0Z/ZZ/8 OdS - - - - - - - - - - - 10 Slunowe Ilews RluO •wd 96nlag a41 ;o leoo pue auOISAelo'auolsllis'auolspues pappBg - - - saA - - - - - - - - - - - - - japio uogemasuoo 1n0gi!m panssl aq ueo I!UUad L L oleo iddV -jalu!Xlu!4l a41 u!411M al 4oea1 PUB Isgsodap auulsnoel PUB le!0e16 w Aelo V Vs 41!m papPaq - - - - SGA - - - 90jol ui puoq aleudmdde seg joleiad0 OL . - - - -jalu! PUSS o!1elewol6uoo"g PueS;o slapnbe gs!Aoejq RIl46ps of gsa5; "almlaued lliM L melAeaS - SaA - - - - - - - f ,md paloage 6luo jolejadO 6 - - - - - ,MN a4l ol,009'Z lnoge peleool aq ll!m'g ma!neGg'llom palelai-se6 to--p0lsweau agl - - - VN - - - - - - - - - - papnlou!leld ajogllam s! 'Pa1e!n9P 11 9 'MNN Bill of AO£' L saA - - - - - - 1!un 6u!(lup-u! algel!ene BOSOMS lua!OWIS L - sap 11 -L ma!neaS;o alluw q/L u!41!M uigl!m (deep ,b6) Ilam jalem paja4s!6ai molleg3 I Si ata4.L - SOA - - - - - - - - - sham ja4lo woy aouelslp jadoad paleool IIaM 9 - - - - - - - 'L 'id-jogouV }lam (Uoleloldxe RVgd io M AOL'£ all l!!M',OL Rq .S£ a aq II!M Sale paloedwl - SO), - - - - --Aepunoq l!un 6wpup woo aouels!p iadoad palL30i 110M 9 - - - - '.Oepunoq Xyadosd lewalxa agl wo4 ,9Z paleool aq ll!M paM •amlowls o!6oloeB molleys - - - - ON - - - - - - - - - - lood pougap a-ul paleool Hem b - - - - - - alep!len of Ilam!Sal leil9'le0!yen'(OAl/oW,009)Mope4s-ABA iagwnu llam anb!un saA - - - - - - - - - iagwnu pue eWeu 116m anb!un £ - - - - •pap!Aold:;Z/g'iwod luasuo0 uaumopue1 pauft agllo Xdooe epAcud WOOM palsanbaa : LZ/L - SeA - - - - - - - aleudoldde lagwnu asea7 Z - - - - - ...... •L99Z6E NoV s! 90epnsgns :6eM-Jo-1g6i8 9dN s! aoephS VN - - - - P940BUB aa; limed L - - - - - - - - - - - - - VN - - (a-VZ"D'(V'L'D0£0'S0`LES'd of suu0;u00 sB6'uanUOOuoN LL uo!lensiu!wpy lesods!o jelnuuV -----LrO ajogS go/u0 Auh eeiVoaO�� adAljsselo le!l!ul 0l d80UTR 6uedwo0 0£LLLLZ:#Old bas woq IIaM _ - 81S ww6wd L M31AV3 :aweN IIaM -"— _ — -- — - load g Pla!d 1S11303HO 11W113d 113M