Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout219-128DSR-4/9/2020
SFD 4/10/2020VTL 4/17/20
Permit to Drill 2181280
MD 11711 TVD
REQUIRED INFORMATION
DATA SUBMITTAL COMPLIANCE REPORT
2/10/2020
Well Name/No. KUPARUK RIV UNIT 1R-231-1 13 Z Operator ConocoPhillips Alaska, Inc.
6773 Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP
Mud Log No Samples No V
DATA INFORMATION
List of Logs Obtained: GR/Res
Well Log Information:
Log/ Electr
Data Digital Dataset Log Log Run Interval
Type Med/Frmt Number Name Scale Media No Start Stop
Log 31483 Log Header Scans 0 0
ED
C
31483 Digital Data
ED
C
31483 Digital Data
ED
C
31483 Digital Data
ED
C
31483 Digital Data
ED
C
31484 Digital Data
ED
C
31484 Digital Data
ED
C
31484 Digital Data
ED
C
31484 Digital Data
Log
2191280 KUPARUK RIV UNIT 1R-231-1 PB2
31484 Log Header Scans 0 0
Log
31485 Log Header Scans 0 0
ED
C
31485 Digital Data
ED
C
31485 Digital Data
ED
C
31485 Digital Data
ED
C
31485 Digital Data
ED
C
31585 Digital Data 11088 14088
ED
C
31585 Digital Data
ED
C
31585 Digital Data
API No. 50-029-22200-60-00
UIC No
Directional Survey Yes
(from Master Well Data/Logs)
OHI
CH Received
Comments
2191280 KUPARUK RIV UNIT 1R -23L1 PB1
LOG HEADERS
11/20/2019
Electronic File: 1 R-231-1 PB1 EOW-NAD27.pdf
11/20/2019
Electronic File: 1R-231-11'61 EOW - NAD27.txt
11/20/2019
Electronic File: 1R-230PB1 EOW NA083.pdf
11/20/2019
Electronic File: 1R-23L1PB1 EOW NAD83.txt
11/20/2019
Electronic File: 1R-231-1 PB2 EOW - NAD27.pdf
11/20/2019
Electronic File: 1R-231-1 PB2 EOW - NAD27.txt
11/20/2019
Electronic File: 1R-231-1 P82 EOW NAO83.pdf
11/20/2019
Electronic File: 1R -23L1 P82 EOW NAD83.txt
2191280 KUPARUK RIV UNIT 1R-231-1 PB2
LOG HEADERS
2191280 KUPARUK RIV UNIT 1R-231-1 PB3
LOG HEADERS
11/20/2019
Electronic File: 1R-231-1 P83 EOW - NAD27.pdf
11/20/2019
Electronic File: 1R-231-1 PB3 EOW - NAD27.txt
11/20/2019
Electronic File: 1R-231-1 PB3 EOW NAD83.pdf
11/20/2019
Electronic File: 1R-2311 P83 EOW NAD83.bd
12/5/2019
Electronic Data Set, Filename: 1R-231.1 P81
GAMMA RES.las
12/5/2019
Electronic File: 1R-23L1P812MD Final.cgm
12/5/2019
Electronic File: 1R-23L1PB1 51VID Final.cgm
AOGCC Page 1 of 5 Monday, February 10, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/10/2020
Permit to Drill
2191280 Well Name/No. KUPARUK RIV UNIT 1R-2311 Operator ConocoPhillips Alaska, Inc. API No. 50-029.22200-60.00
MD
11711
TVD 6773
Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP UIC No
ED
C
31585 Digital Data
1215/2019
Electronic File: 1R-231-1 PB1 5TV15SS Final.cgm
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB1 21VID Final.pdf
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-231-11381 51VID Final.pdf
ED
C
31585 Digital Data
12/512019
Electronic File: 1R-23L1PB1 5TVDSS Final.pdf
I ED
C
31585 Digital Data
12/512019
Electronic File: 1R-231-1 P131 EOW - NAD27.pdf
I ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R -23L1 P81 EOW - NAD27.tx1
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB1 Final Surveys
14088 TD.csv
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-23L1PB1 Final Surveys
14088 TD.xlsx
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-23L1PB1 Survey Listing.txt
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB1 Surveys.txt
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R -
23L1 PB1_25_tapescan_BHI_CTK.txt
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R -
23L1 PB1_5_tapescan_BHI_CTK.txt
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-23L1PB1_output.tap
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB1 2MD
Final.cgm.meta.tif
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-23L1PB1 5MD
Final.cgm.meta.tif
ED
C
31585 Digital Data
12/5/2019
Electronic File: 1R-231-1PB1 5TVDSS
Final.cgm.meta.tif
ED
C
31586 Digital Data
11088 13010 12/5/2019
Electronic Data Set, Filename: 1R-23LIP82
GAMMA RES.Ias
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1PB2 21VID Final.cgm
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1 R-231-1 PB2 51VID Final.cgm
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R -23L1 PB2 5TVDSS Final.cgm
I ED
C
31586 Digital Data
1215/2019
Electronic File: 1R-231-1 PB221VID Final.pdf
ED
C
31586 Digital Data
12/5/2019
Electronic File: IR -231-1 P8251VID Final.pdf
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1PB25TVDSS Final.pdf
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-23111PB2 EOW - NAD27.pdf
AOGCC
Page 2 of 5
Monday, February 10, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/10/2020
Permit to Drill
2191280 Well Name/No. KUPARUK RIV UNIT IR -231-11 Operator ConocoPhillips Alaska, Inc. API No. 50-029-22200.60.00
MD
11711
TVD 6773
Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP UIC No
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB2 EOW - NAD27.txt
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB2 Final Surveys.csv
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-23L1PB2 Final Surveys.xlsx
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-23L1PB2 Survey Listing.txt
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1 P82 Surveys.bd
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R -
23L1 PB2 _25_tapescan_BHI _CTK.txt
ED
C
31586 Digital Data
12/512019
Electronic File: 1 R-
231-1 PB2_5_tapescan_SHI_CTK.txt
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB2_output.tap
ED
C
31586 Digital Data
12/5120119
Electronic File: 1R-231-1 PB2 2MD Final.tif
ED
C
31586 Digital Data
12/5120119
Electronic File: 1R-231-1 PB2 51VID Final.tif
ED
C
31586 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB2 5TVDSS Final.tif
ED
C
31587 Digital Data
11088 13760 12/5/2019
Electronic Data Set, Filename: 1R-23L1PB3
GAMMA RES.las
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB32MD Final.cgm
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1PB3 5MD Final.cgm
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1 R-231-1 P83 5TVDSS Final.cgm
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB32MD Final.pdf
ED
C
31587 Digital Data
12/5120119
Electronic File: 1R-231-1 PB35MD Final.pdf
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3 5TVDSS Final.pdf
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R -23L1 PB3 Surveys @ 13760
TD Unconfirmed.csv
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3 Surveys @ 13760
TD Unconfirmed.xlsx
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3 EOW - NAD27.pdf
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3 EOW - NAD27.txt
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 P83 Survey Listing.txt
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3 Surveys.txt
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R -
23L1 PB3_25_tapescan_BHI_CTK.txt
AOGCC
Page 3 of 5
Monday, February 10, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/10/2020
Permit to Drill
2191280 Well Name/No. KUPARUK RIV UNIT 1R -23L1
Operator ConocoPhillips Alaska, Inc. API No. 50-029.22200-60-00
MD
11711
TVD 6773 Completion Date 10/28/2019
Completion Status SUSP Current Status SUSP UIC No
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-
Release Date: 9/27/2019
Description
231-1 PB3_5_tapescan_BHI_CTK.tM
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3_output.tap
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1 R -23L1 PB32MD
Final.cgm.meta.tif
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1 R-231-1 PB35MD
Final.cgm.meta.tif
ED
C
31587 Digital Data
12/5/2019
Electronic File: 1R-231-1 PB3 5TVDSS
Final.cgm.meta.tif
Well Cores/Samples Information:
Sample
Interval
Set
Name
Start Stop
Sent Received Number
Comments
INFORMATION RECEIVED
Completion ReportDY
Directional / Inclination Data I r I
Production Test Information Y / AA
Mechanical Integrity Test Informations YY
Geologic Markersrrops D
Daily Operations Summary
COMPLIANCE HISTORY
Completion Date: 10/28/2019
Release Date: 9/27/2019
Description
Date Comments
Comments:
AOGCC
Mud Logs, Image Files, Digital Data Y /� Core Chips Y / MIL
Composite Logs, Image, Data Files Core Photographs Y C--)/®A
Cuttings Samples Y Laboratory Analyses Y&
J�/
Page 4 of 5 Monday, February 10, 2020
DATA SUBMITTAL COMPLIANCE REPORT
2/10/2020
Permit to Drill 2191260 Well Name/No. KUPARUK RIV UNIT 1R-231-1
MD 11711 TVD 6773 Co n Date 0/28/2019
Compliance Reviewed By:
Operator ConocoPhillips Alaska, Inc. API No. 50.029-22200.60-00
Completion Status SUSP Current Status SUSS / UIC No
Date: O' 2-0 Za
AOGCC Page 5 of 5 Monday, February 10, 2020
Baker at PRINT DISTRIBUTION LIST
Hughes
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME IR-23LIPB1
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT
Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider@bakerhughes.com
STATUS Final
COMPANY
2 19 128
31585
se sign and return one copy of this transmittal form to:
ocoPhillips Alaska, Inc.
I Osterkamp (WNS Petroleum Technician)
G Street.
'forage, Alaska 99510
LOG TYPE GR - RES
LOG DATE October 22, 2019
TODAYS DATE December 3, 2019
Revision
Replacement: No Details:
Rev. Requested by:
ADDRESS (FEDEX WILL NOT DELIVER TO Po BOX)
PERSON ATTENTION
4 -
BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
Ii Wells Admin Brenda Glassmaker & Peggy O'Neill
1900 E. Benson Blvd.
Anchorage, Alaska 99508
FIELD
FINAL
CD/DVDFINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
I
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINT
# OF COPIES
I#OFCOPIES
# OF COPIES
pi
2 ConocoPhillips Alaska Inc.
Atm: Ricky Elgarico
ATO 708
1700 GStreet RECEIVED
Anchorage, AK 99510 DEC 0 5 2019
3 Exxon Mobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska -AOGCC 1 1
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 ON R - Division of Oil & Gas *•* 1
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
M
6 BP Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE: 0 1 2 0 0
Baker $ PRINT DISTRIBUTION LIST
Hughes
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME 1R-23L1PB2
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT Alaska
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider@lakerhuahes.com
STATUS Final Replacement:
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
V
I BP North Slope.
EOA, PBOC, PRB-20 (Office 109)
D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill
900 E. Beason Blvd.
Anchorage, Alaska 99508
v_
219128
31585
Please sign and return one copy of this transmittal form to:
ConocoPhillips Alaska, Inc.
Tom Osterkamp (WNS Petroleum Technician)
700 G Street.
Anchorage, Alaska 99510
Ito acknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE October 24, 2019
TODAYS DATE December 3, 2019
Revision
Details:
Rev. Requested by: ---
FIELD I
FINALCD/DVD
FINAL
ATO 708
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
REPORT
LOGS
3 ExxonMobil, Alaska
CGM, Final Surveys)
(Compass)
# OF PRIN
ur rKIN
# OF COPIES
1901 -COPIES
# OF COPIES
2 ConocoPhillips Alaska Inc.
Attn: Ricky Elgarico
ATO 708
E 'V /► �i
700 G Street
`a �p
DEC
Anchorage, AK 99510
p 5 2019
3 ExxonMobil, Alaska
Attn: Lynda M. Yaskell and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
4 State of Alaska - AOGCC 1 1
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
DNR- Division of Oil & Gas ***
Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
BP Exploration (Alaska)Inc.
Petrotechnical Data Center, LR2-1
900 E. Benson Blvd.
Anchorage, Alaska 99508
TOTALS FOR THIS PAGE: 0 1 2 0 0
Baker S PRINT DISTRIBUTION LIST
Hughes
COMPANY ConocoPhillips Alaska, Inc.
WELL NAME 1R-23L1PB3
FIELD Greater Kuparuk Area
COUNTY North Slope Borough
BHI DISTRICT
Alaska
219128
31587
Please sign and return one copy of this transmittal form to:
ConocoPhillips Alaska, Inc.
Tom Osterkamp (WNS Petroleum Technician)
700 G Street.
Anchorage, Alaska 99510
Ito acknowledge receipt of this data.
LOG TYPE GR - RES
LOG DATE October 27, 2019
AUTHORIZED BY Patrick Rider
EMAIL Patrick. Rider@bakerhughes.corn TODAYS DATE December 3, 2019
Revision
STATUS Final Replacement: No Details:
Rev. Requested by: ---
COMPANY
ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX)
PERSON ATTENTION
lu
1 BP North Slope,
FOA, PBOC. PRB-20 (Office 109)
D&GWO Wells Admin Brenda Glassmakcr & Pegg) O'Neill
900 E. Benson Blvd.
Anchorage, Alaska 99508
2 ConocoPhillips Alaska Inc.
Atm: Ricky Elgarico
ATO 708
700 G Street
Anchorage, AK 99510
3 ExxonMohil, Alaska
Attn: Lynda M. Yaskeil and/or Leonardo Elias
3201 C Street, Suite 505
Anchorage, AK 99503
FIELD I
FINAL
CD/DVD
FINAL
PRELIM
LOGS
(las, dlis, PDF, META,
SURVEY
I
REPORT
LOGS
CGM, Final Surveys)
(Compass)
# OF PRINTS
# OF COPIES
# OF COPIES
# OF COPIES
1� 4 4 4
4 State of Alaska - AOGCC i
Attn: Natural Resources Technician 11
333 W. 7th Ave, Suite 100
Anchorage, Alaska 99501
5 DNR - Division of Oil & Gas ***
.Attn: Resource Evaluation
550 West 7th Avenue, Suite 1100
Anchorage, Alaska 99501
*** Stamp "confidential" on all material deliver to DNR
6�14P Exploration (Alaska) Inc.
Petrotechnical Data Center, LR2-1
,900 E. Benson Blvd.
Anchorage. Alaska 99508
fel G I73oT3i1M.I&MU01
DEC 0 5 2019
AOC;rr,
0 1 2 0 0
STATE OF ALASKA
ALA, ry OIL AND GAS CONSERVATION COMMIS. iON
REPORT OF SUNDRY WELL OPERATIONS
NOV 2 7 2019
1. Operations Abandon ❑ Plug Perforations ❑
Fracture Stimulate ❑
Pull Tubing ❑eo Us lutdown 0
Performed: Suspend ❑ Perforate ❑
Other Stimulate ❑
Alter Casing ❑ Change Approved Program ❑
Plug for Redrill ❑ erforate New Pool ❑
Repair Well ❑
Re-enter Susp Well ❑ Other: ❑
2. Operator
4. Well Class Before Work:
5. Permit to Drill Number:
Name: ConocoPhillips Alaska, Inc.
Development ❑
Stratigraphic❑
Exploratory ❑
Service ❑
219-128
3. Address: P. O. Box 100360, Anchorage, Alaska
6. API Number:
99510
50-029-22200-60-00
7. Property Designation (Lease Number):
8. Well Name and Number: KRU 1 R -23L1
ADL 25627 ALK 2560
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10.
Field/Pool(s):
N/A
Kuparuk River Field / Kuparuk River Oil Pool
11. Present Well Condition Summary:
Total Depth measured 12,180 feet
Plugs
measured None feet
true vertical 7,004 feet
Junk
measured None feet
Effective Depth measured 12,178 feet
Packer
measured 11,581 feet
true vertical 7,003 feet
true vertical 6,713 feet
Casing Length Size
MD
TVD Buret Collapse
CONDUCTOR 79 feet 16
123' MD
123' TVD
SURFACE 6,289 feet 9 5/8 "
6,331' MD
4072' TVD
PRODUCTION 12,149 feet 7
12,178' MD
7002' TVD
Perforation depth: Measured depth: 11710-11770 feet
True Vertical depth: 6774-6803 feet
Tubing (size, grade, measured and tme vertical depth)
3.5 "
J-55 11,610' MD 6,727' TVD
Packers and SSSV (type, measured and true vertical depth) PACKER- BAKER HB RETRIEVABLE PACKER 11,581' MD 6,713' TVD
12. Stimulation or cement squeeze summary:
Intervals treated (measured): N/A
Treatment descriptions including volumes used and final pressure:
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf
Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: Shut -In
e
e e e
Subsequent to operation: Shut -In
a
e e e
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
15. Well Class after work:
Daily Report of Well Operations O
Exploratory ❑
Development O Service ❑ Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work:
Oil ( Gas L] WDSPL ❑
Printed and Electronic Fracture Stimulation Data EDGSTOR
ElWINJ ❑ WAG [_1GINJ ❑ SUSPfI� 1&9+ SPLUG❑
17. 1 hereby certify that the foregoing is true and correct t0 the best of my knowledge.
Sundry Number or N/A if C.O. Exempt:
319-489
.I4 M ¢S li+xey
rr^^ Contact Name: Ryan McLaughlin
'/vnc�
Authorized Name: James Ohlin er
7"^ 0'V">"
Contact Email: ryan.mclaughlin@cop.com
Authorized Title: Staff CTD En Ineer
C
/�p Contact Phone: (907) 265-6218
t/ 2 4 /
Authorizetl Si nature:
Dale:
Form 10404 Revised 4/2017
Y7—L, /2 //6// 9
,f1WI617
IBDMS i'DEC 011019 Submit Original Only
KUP IN WELLNAME 1R-23 WELLBORE 1R-23
/• -' ' Well Attributes Max Angle & TD
�OflOCOPiII��(p5 FreleName We11EarcAPYUWI Well�ea... Icl1'I N (.Be) ....pen.)
AIBSk,'1. r1C. NI IPARIINFIVFRIINIT 5nnJ9JJ2nnnn INI F11_I 3000000 121600
SSSV'. TROP
le-z"Ieaamfinal eAM
Last Tag
Vueoleurmeelnon)
Annotation aepxi(KKBI End Odle WNIWre last Moe ay
Last Tag SW I 11)350 lal 1R-23 inninal
-------- - -- -- -
Last Rev Reason
Annotation 1 Enc naR WeIIGore last Moe By
rvarvcsR. M6
RAV Reason: Set WniDstoch 9282019 1R-23 famaj
1 1
Casing Strings
ILL
Cavae Descnotlan ODtlnl )DMI Too INKIN Se137,11 Dmill Set Noun RV.1 IMLen If G,nee rap Tnreae
CONDUCTOR 16 15.06 446 123.0 123.0 62.50 HAO WELDED
,Pme, Romm"ein .Dual ID lin) T.P(M(6) Stl Nal must Set DN. Uvox..WIILen x... Gretle top Tnreatl
SURFACE 95M 8.92 420 6,330.8 4,0nA 36.00 J-55 8TC
cmi conamnionOD 11.1 1D IIn) 101puni) Set..ph III SN DanielUIRA. YRILen x... Gretle Top Tnreatl
PRODUCTION 7 6.28 29.2 12,1777 7,002.5 26.00 L-80 NSCC
FUND) 8.440-15.0 1
Tubing Strings
TunlnA DeenlpMe Str1I No IDllnl top lKKa) Set Depth lrt.. set..On Tv.f .. AT.) Do Tap conn -.a
TUBING WO 3112 2.99 383 11,609.9 672fiJ 9.30 J-55 EUEABMOD
Completion Details
sAI YLV;'em.
Top RVD) Topmcl Nominal
Top lrtMe) InKED p) Item Dan com ID (in)
38.3 38.3 0.01 HANGER FMC GEN IV TUBING HANGER 3.WI
1,8160 1,7194 3909 SAFETYVLV CAMCOTROP-IA SAFETYVALVE 2.812
11,5299 6,689.0 61.87 NIPPLE OTIS% SELECTIVE LANDING NIPPLE 2.813
GAS UFT.%a
11,57.5 6,]067 61.89 PBR BAKER PBR 3.000
11,5812 6,713.1 61.90 PACKER BAKER HB RETRIEVABLE PACKER 2.890
11,597.5 6,720.8 61.91 NIPPLE OTIS%N NIPPLE NO GO 2.750
11,609.2 6,726.3 fit 88 SOS BAKER SHEAR OUT SUB 2992
Other In Hole (Wireline retrievable plugs,
valves, pumps, fish, etc.(
Top I,.)
loci
Top(nKB
IRKS)
IT,,
P) I
Des
Com
Run Data
ID (in)
11,682.0
6,760.]
61.66
WHIPSTOCK
Nonnern BAulions -700 Hign Expansion Wedge.
91282019
0000
I
Se14 6 degrees ROHS. w1 RA tag at 11689' p' below
top of HEW). GAL 8.8Max OD 2625'
suRFAce.42oa,Aaoe
Perforations 8 Slots
sbt
Dena
To,(Ti
sun RVDI
(snonm
Too (ft.)
Bim ixKB)
Ban
iIKS)
LimFM 2me
Data
)
iype
Com
1 IiIIVR
11)]0.0
6,]]41
18,8031-
-,U I
11511992
10.0
)PERF
45" Csg 60 deg eg pn
NumUET', 11 <ea1
B. 1R-23
Frac Summary
sam Duh P.Wani DevPned Qn) PmPWM In Fmmanan (in)
1&1111995
.N. Stan. Tap Daplhoppl) BLlnRWFIUWSysh vol cean lneq Vosurye
xlpvle.u.,e
1 1&111995 11,]11(
1,7M0
Mandrel Inserts
sr
nI
H Top RVI)
Topples) "a)
Mab Model Do (in)
Valve loco Ports. moat.
Sery Than Type (in) )pep Run Dale Com
P9RI 11'eszs
3,250.] 2,493.2
CAMCO K U - 1
GAS LIFT DMY BK 000000 1&2]/1992
M
PACKER: 11.pis
2 11484.5 6.66].5
OTIB DBD 1 1112
IGAS LIFT OMY RM 0.000 0.0 d1111992
Notes: General & Safety
End Oac Annotation
MPPIf; 11,5875
9/1 912 01 3 NOTE'. PROD CSG RKB per RIG DETAIL SHEET
11/1412019 NOTE'. View a0en is wl AlasW SAnemai0
AOs, n W33
WXIPSTOCK 11.6920
SPaD 1111..11
)PERF', U,71.. me
PRODUCTION; A 2-1217y.i�
an 0e�zt 0 Plee�o%Zo
�eaLimaL
aw.oaz'c� ® m
oeancreL
OW ,fi09'LL le 905 ,i6-£
(-O, N'01 ulw.g/'z)0W.9BS'LL 199lddlo-NX SLLO
(01.9g'z) OW b9g'L L ism pod SH JayeS
OW.899'LL1e NU Z/L-C my9S
(01 „£L9'z) OW ,0£g'L L 0 alddlu Bulpual m1palaS X SILO
,9g9' LNs lmpuew WI 6e8 SLLO,.7in
,Lgzg le Immew ull6eB wwn..V&-9
wepns m awgn1 Wg ana gon we m -C
OW ,9W le ASSS VL-dO Nl wweO LL-£
"'6i'a "r"T,�i°',6'T agewe4aS O11D 4uw1nD£z-8L
aw Ru'zL
904609-1 ON .1
OW ,Da, LL - ALLU
.ym puet0
OWd££9
ea4s 9w N96 „95'8
OW .ea 0
90430"9Z9.9L
1 R -23L1
OPERATION SHUTDOWN
DTTM JOBTYP SUMMARYOPS
START
10/26/19 DRILLING Drill ahead from 12,496 to 13,350' performing short, 400' wipers after every
SIDETRACK 100' drilled and a long wiper to the window to clean up the 7" and tie in after
200' drilled. Experiencing some set downs @ the window - 50% of the time,
spinning the bit and passing cleanly. Experiencing some WOB tugs and
spikes @ 12,650'. Briefly stuck and packed off at the window on the way up
hole on a wiper. Worked pipe, regained returns, continued on wiper trip.
Drilled to a midnight depth of 13,350'.
10/27/19 DRILLING Drill ahead from 13,350' to 13,760' pulling short wipers every 100' drilled and
SIDETRACK long wipers to the window every 200' drilled. On wiper to tubing tail, -6 WOB
tug @ 12,626' and at 11,738' (partial pack -oft), stack pipe when attempting
to RBIH, work pipe free going down, RBIH, pump sweeps circulate out, pull
through window. Difficulty running back through window. Tie into tK1, RBIH
unable to pass through window. POOH for clean out assembly. At surface
PUD BHA #12, PD BHA #13, 0.5 °AKO motor w D331. RIH to midnight
depth of 10,645'
10/28/19 DRILLING Continue to RIH from 10646'. Make multiple attempts to get through
SIDETRACK window, setting down at 11,888'. Metal in returns. Attempt to RIH while
varying pump rates and running speeds, 15-30 ft/min 0.25 to 1.8 bpm - no
success. Wash down on tray to 11,687' PUH, cut pump, RIH clean to
11,711'. Seeing WOB spikes to 1 k. Attempt to PUH through window
pumping, packed off and stuck. Worked pipe and pulled free. Attempt to
RIH pumping 1.8 bpm, S/D 11,688. PU RIH dry, pass through clean. Ramp
pumps to 1.8 bpm while RIH to 11,711'. Attempt to PUH, packed off and
stuck. Work pipe - 1 hr total to 46 k -7 k WOB no luck. Work pipe to 80k.
Three cycles pull free, well unloaded. Chase sweeps bottoms up. PUH on
swab wiper PUD BHA #13. PU BHA #14 coilTrac with nozzle. RIH and
clean up 7" with jetting passes and multiple sweeps. Chase sweeps out of
hole turning well over to seawater and freeze protecting with 30 bbls of
diesel from 2500' MD to surface. PUD BHA #14. Jet stack, blow down
same, examine with Bore -O -Scope - good. Work rig down checklist. Rig
release @ 10/29/2019 0:00
Note to file: KRU 111-231-1: Total depth set as 11,711' MD/6,773' TD by Steve Davies, senior petroleum
geologist, AOGCC. Well was drilled to 13,760' MD, drillers POOH but could not get back below 11,711'.
See daily drilling operational report for more details.
MGuhl 2/25/2020
e>ta.v1116.■ V ilmay.
STATE OF ALASKA NOV 2 2 2019
ALASKA OIL AND GAS CONSERVATION COMMISSION A � �
WELL COMPLETION OR RECOMPLETION REPORT A
ta. Well Status: oil[] Gas El SPLUG ❑ Other ❑ Abandoned ❑ Suspended E]
20MC 25.105 20MC 25.110 '
GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions:
1b. Well Class.
Development Q ' Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Abend.: 10/28/2019
14. Permit to Drill Number / Sundry:
219-128 '
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
10/18/2019
15. API Number:
50-029-22200-60-00
4a. Location of Well (Governmental Section).
Surface: 4854' FNL, 144'FWL,Sec 17, T12N, R10E, UM '
Top of Productive Interval:
4574' FNL, 1803'FWL, Sec 9, T12N, RI OE, UM
Total Depth:
N/A
8. Date TD Reached:
N/A
16. Well Name and Number:
KRU 1R-23L1/PB1, PB2, PB3
9. Ref Elevations: KB:88' •
GL: 45' . BF:
17. Field / Pool(s):
Kuparuk River Field/ Kuparuk River Pool
10. Plug Back Depth MD/TVD:
N/A
18. Property Designation.
• ADL 25627, ALK 2560
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface. x- 539830 • y- 5991630 Zone- 4 '
TPI: x- 546719 y- 5997229 Zone- 4
Total Depth: x- N/A y- N/A Zone- 4
11. Total Depth MD7 :7
NIA 11,%/1' („.7-7:j
19. DNR Approval Number:
LONS 83-134
12, SSSV Depth m/TVD-
N/A '14 r& r
20. Thickness of Permafrost MD/TVD:
/ 1752' MD/1669-TVD '
5. Directional or Inclination Survey: - Yes ❑� (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
• 11682' MD/6761' TVD '
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/Res
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
16" 62.5 H-40 44.0" 123' 44' 123' 331 sx AS 1
9-5/8" 36 J-55 42.0' 6331' 42' 4072' 1300 sx PF E, 630 sx Class G
7" 26 L-80 40.0" 12178' 40' 7003' 380 sx Class G
24. Open to production or injection? Yes ❑ No Q
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
'5"�
AT
16ft-TZd!'
VERIFIED
j{GJ
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
3-12" 11610' 11581'/6713'
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes E] No [2]
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
N/A
Method of Operation (Flowing, gas lift, etc.):
UNABLE TO COMPLETE DRILL
Date of Test:
Hours Tested:
Production for
Test--
Test Period
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Choke Size:
Gas -Oil Ratio:
Tubing
Press.
Casing Press:
Calculated
24 -Hour Rate
Oil -Bbl:
Gas -MCF:
Water -Bbl:
Oil Gravity - API (corr)
Form 10407 Revised 5/2017 v-rL- IZ/*/19 CONTINUED ON PAGE 2 Submit ORIGINIALonI
ABDMS � NOV 2 6 2019 4\lz_;& /p
28. CORE DATA Conventional Co,�ls): Yes ❑ No ❑ ' Sidewall Cores: res ❑ No ❑ .
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology, and presence of oil, gas or water (submit separate pages with this form.
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested) Yes ❑ No ❑�
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1752
1669
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
11682
6761
information, including reports, per 20 AAC 25.071.
Formation @ TPI -
Kuparuk C3
1R-23L1 PB1 TO
14088
6726
Formation @ TD- Kuparuk D
1R-231-1 PB2 TD
13010
6741
Formation @ TD- B-2
1R-231-1 PB3 TD
13760
6735
Formation @ TD- B-3
Formation at total depth: N/A
31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: James Ohlin er a h Ci �'Yvi t,rr 3a,. cS 041rContact Name: Ryan McLaughlin 00
Authorized Title: Staff CTD Engine r Contact Email: R an.McLau hlin co .com
Authorized 4+ Contact Phone: 265-6218
Signature: Date: 11121liq
INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
with each
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this forth and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
1R-21 Current CTD Schematic
16" 6291-40 shoe
012Y MID
9.5/8" 36k J-55 shoe
6331' MD
Ccand Pits
11,71a -11,770' MD
r' 26#L-80 shoe
2,178' MD
3-12 Cam. TRDP-1A SSSV M 1816 MD
3.12" 9.3#J-56 EUE 8rd Tubing to surface
3-1/2" Camco gas lib mandrel at 3251'
3-12" OTIS gas lift mandrel at 11,485'
OTIS X Selective landing nipple ®11,530' MD (2.813!'[D)
Baker 3 Ia' PBR at 11,568' MD
Baker 18 packer at 11,581' MD (2.88" ID)
OTIS XN-nipple at 11,588' MD (2.75" min ID, NO-GO)
3.12" SOS at 11,609' MD
R33L0]
TD ®11P3.TW' Mp
To -]3L1 in
TO ®I3.o10' n
O-23-1 rBIIMI®1;130'MA
R3 L1PB1
TO ®16,008' MD
ORNchor Bilet®1;190MO
Uperations
Summary
(with
Timelog
Depths)
Li
1 R-23
Rig:
End Time
NABORS
Dur(hn
1.00
CDR3-AC
Phase
MIRU
Op Code
MOVE
Adi"Cotle
CTOP
Time P -T-% Install
P damaged
Job: DRILLING
Operation
UII late, PJSM, perform
oil procedure with rig CTC,
SIDETRACK
Start Depth
CIKBJ End
0.0
Depth(RKB)
0.0
Time Log
Start Time
10/15/2019 10115/2019
12:00 13:00
repeat
with BOT external CTC, trim 2
7'
section of coil for testing, prep coil
4.00
MIRU
MOVE
CTOP
for
P (#53723/16600),
shipment.
1Begri n of reel nstall grapple into
0.0
0.0
10/15/2019 10115/2019
13:00
17:00
coil, remove inner reel iron and
bulkhead, remove wash pipe, remove
horses head counter, pin back INJH
10/15/2019
1.00
MIRU
MOVE
CTOP
P7-
counter.
d �from INJH
secure coUntab il to spolol, remove saddle
0.0
0.0
10/15/2019
17:00
18:00
TOM 5/2019
19:30
1.50
MIRU
MOVE
CTOP
P
clamps, reel in hanging
bombayPrep to rdoor dike, remove king pmove reel, from rig, reff in,
bombay doors, open doors
0.0
0.0
10/15/2019
18:00
10/15/2019
1.00
MIRU
MOVE
CTOP
P
Load out
reel, secure onto truck.
0.0
0.0
10/15/2019
19:30
19:30
20:30
10/15/2019
21:30movesidedoorper
1011512019
1.00
1.00
MIRU
MIRU
MOVE
MOVE
7 -0 -PP
CTOP
P
Moven and spot reel for pick. load
reel into rig.
Rya out sump andsinsp inspect INJH,
0.0
0.0
0.0
0.0
10/15/2019
20:30
10/15/2019
21:30
2230dles,shim
10116/2019
1.50
MIRU
MOVE
CTOP
P
Install reel in
Prep ereel � or
0.0
0.0
10/15/2019
22:30
00:00
1011612019
6.00
MI RU
MOVE
CTOP
PStab
stabbing
C
M/U Inner lreel iron, M/tor U p pressure
0.0
0.0
10116/2019
00:00
06:00
bulkhead, Nipple down BOPS, R/D
10/16/2019
6.00
MIRU
MOVE
RURD
P
cellar
Complete
hook Dup toasows & pull k trucks loff well,
0.0
O.D
10/16/2019
06:00
12:00
10/16/2019
4.50
MIRU
MOVE
MOB
P
jeep up modules
Move from 1A -Pad to 1R -Pad
0.0
0.0
TOM 6/2019
1200
16:30
10/1612019
2.30
MIRU
MOVE
MOB
P
Spots sub &pits over 1R-23, lay mats
0.0
0,0
10/16/2019
16:30
18:48checklist,
10/16/2019
1.50
MIRU
MOVE
RURD
P
drop,0.0
secure landings, move shop & 1/2-
0.0
10/1612019
1848
20:18
Way house to 1R -Pad & spot up
10/16/2019
2.20
MIRU
WHDBOP
NUND
-_
P
Continue RU
MP line t tangoocklst valvesNU BOPE, MU
0.0
0.0
1011612019
20:18
2230
1.50
MIRU
WHDBOP
RURD
P
Rig Accepted: 10/16 @ 22.30 hrs
tiger-Conthank hardline, begin greasing all171t,t
D.0
0.0
t 011612019
1011712019
22:30
00:00
valves post N2 blow -down, grease
tree valves, swabs, & tango valves
10/17/2019
10/17/2019
0.80
MIRU
WHDBOP
RURD
P
vat eComsecomplete prcomepte Rtfor BOP tereasingsts
0.0
0.0
00:00
00:48
0.70
MIRU
WHDBOP
PRTS
P
lines, cycle
off dPJSeli g choke, perform shell ed
0.0
00
10/17/2019
10/17/2019
00:48
01:30
10/17/2019
7.00
MIRU
WHDBOP
BOPE
P
Perform
3500 psi lhigh) bal BFaail Pass t onSR Psi low/
0.0
0.0
10/17/2019
01:30
08:30
Witnessed by Lou Laubenstein of
the AOGCC
10/17/2019
2.00
MIRU
WHDBOP
BOPE
P
Fill Coil test inner reel iron, pressure
bulkhead, and stripper
0.0
0.0
j019
10:30
10/17/2019
1.00
PROD1
WHPST
PRTS
P
Pressure test PDL's and TT line
00
00
019
11:302019 10/17/2019
1.00
PROD1
WHPST
RGRP
P
12:30
Paae 1117
Report Printed:
1116/2019
AWNUperations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Stan Time
End Time
our (hr)
Phase
Op Code
Activity Code
Tme P -T -x
P
Operation
PJSM.M/U BHA#1 with 1° WFT fixed
(ftKB) End
0.0
Depth(ftKB)
76.9
10/17/2019 10117/2019
1.80
PROD1
WHPST PULD
bend
motor, 2.74" String reamer, and
1230 14:18
2.74"
diamond window mill. PD BHA
#1
10117/2019 10/17/2019
2.10
PROD,
WHPST
TRIP
P
RIH, EDC open, Pumping seawater
76.9
11,120.0
1418 16:24
WHPST
DLOG
P
coil), Inspect
11,120.0
11,515.0
10/17/2019 10/17/2019
0.20
PRODt
cou ter, PUW=39Knew
1624
16:36
WHPST
FI -Sp
P7--
Continue in well, tag nipple at 11,598',
11,515.0
11,680.9
10117/2019
10/17/2019
1.30
PROD?
pickup, close EDC, bring on pumps,
1636
17:54
get right through, displace to milling
fluid, dry tag TOWS at 11,681.9'
10/17/2019
2.10
PROD1
WHPST
WPST
P
Milling pumping at 11,680.9, FS = 709
11,680.9
11,682.4
10/1712019
psi @ 1.9 bpm, CWT = 14.3K, WOB =
1754
20:00
-0.7K, annular = 4123 psi (11.8 ppg at
window), WHP = 145 psi, pump =
4791 psi1.9 bpm in, 1.82 bpm out,
vibrations climb to 3's
10/1712019
1011812019
4.00
P ROD1
WHPST
WPST
P
Milling @ 11,682.4', CWT= 13.3K,
11,682.4
11,685.2
WOB = 1.4K, annular = 4117 psi,
20:00
00:00
WHP = 148 psi, pump = 4850 psi,
vibrations to 3's
10/18/2019
0.50
PROD1
WHPST
WPST
-P7-
WOB CrWT= 1309iK
11,685.2
11,685.8
10/18/2019
0.3K685.2',
00:00
00:30
WHP = 151 psi, pump = 4786 psi
TOWS = 11,681', BOW = 11,684.5'
Pre -load DS PDL with build/turn tools
1017812019
3.00
PROD1
WHPST
WPST
P
it,
reamer g'I(PU
PUW
11,685.8
11,710.0
10/1812019
= 35K at 11,707tring
to adj sl
00:30
03:30
TF), mill rat -hole to 11,710', PUW =
36K
10/18/2019
10/18/2019
1.30
PROD!
WHPST
REAM
P
g passes SIR
11,710.0
11,710.0
335Rr & 185Rndry drift up &down,
0330
04:48
clean
1.00
PROD!
WHPST
REAM
P
Perfasses
11,710.0
11,710.0
10/18/2019
10/18/2019
ensure ultrda slmooltheaming w ndown Confrmo
04:48
05:48
TO @ 11710 after dry drift
10/18/2019
10/18/2019
2.00
PROD1
WHPST
TRIP
P
Trip out of hole, Open EDC @ 11610'
11,710.0
55.0
05:48
07:48
0.80
PRODS
WHPST
PULD
15--
Tag up, Space out, PUD BHA#1. Mills
55.0
0.0
10/!8/2019
10/18/2019
@ 2.74 Go, 2.73 No Go
07:48
08:36Dut
1.00
PROD1
DRILL
PULD
P
Reconfg BHA, Not running USR, ii
0.0
62.6
10/!8/Z019
10/18/2019
BHA #2 with 2.5° AKO motor and RB
08:36
09:36
Hughes bi center. Make up to coil and
surface test. Check pack offs.
t 0118/2019
10/18/2019
2.20
PRODi
DRILL
TRIP
P
Trip in hole, BHA#2
62.6
11,080.0
09:36
11:48
DRILL
DLOG
P
Log K1 for+21.5', Close EDC
11,080.0
11,133.0
10/18/2019
10/18/2019
0.10
PROD?
11:48
11:54
TRIP
P
nue in well, Wt chk
@window5
11.133.0
11,710.0
10/18/2019
10/18/2019
0.20
PRODI
DRILL
36KCon,
Cleanpass through
11:54
12:06
DRILL
DRLG
P
, Drill, 1.91 BPM @44U0 PSI
11,710.0
11,755.0
10/18/2019
10/18/2019
1.10
PROD1
FS, HP=4155, Drill to EOB @ 11755'
FS, B
1206
13:12
Near bit INC @ 88°
10/18/2019
10/18/2019
0.20
PROD1
DRILL
TRIP
P
End of build PUH to tie into K1
11,755.0
11,100.0
13:12
10118/2019
13:24
10/18/2019
0.20
PROD1
DRILL
D LOG
P
Log Kt for 11 foot .
11,100.0
11,132.0
13:24
10/18/2019
13:3611,132.0
10/18/2019
0.10
PRODt
DRILL
TRIP
P
RBIH to log RA marker
11,700.0
1336
13:42
Page 2/17 Report Printed: 11/612019
Operations Summary (with Timelog Depths)
r �T"►r-F_..
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Our (hr)
Phase
Op Code
Activity Code
Time P -T -X
P
Operation
Log RA @ 11,689', TOWS @ 11682,
(MB)
K 00.0
End Depth
10/18/2019
10/18/2019
0.10
PRODi
DRILL
DLOG
TOW @ 11,685, BOW @ 11,688
13:42
13:48
2.10
PROD1
DRILL
TRIP
P
Tull up through window, Open EDC,
11,724 .0
65 .1
10/18/2019
10/18/2019
POOH
13:48
10/18/2019
15:54
10/1812019
1.00
PROD1
DRILL
PU
T7___
At surface, PJSM, Tag up space out.
65.1
0.0
PUD BHA#2 build section BHA
15:54
10118/2019
16:54
10/18/2019
1.10
PROD1
DRILL
PULD
P
PD BHA#3 Drilling Assembly (NOV
0.0
78.0
Agitator, 0.5° AKO motor, new Baker
16:54
18:00
Dyna -Pilot bit), slide in cart, check
pack -offs, MU to coil, tag up, set
counters
-f0/1 8/20-19 -T-O,,
8/20-19
-1 00
PROD,
DRILL
TRIP
P
RIH w/BHA #3
78.0
11,100.0
1800
10/18/2019
19:00
10/18/2019
-0 20
PROD?
DRILL
DLOG
P
log K1 for +16' correction
11,100.0
__T11520
1900
10/18/2019
19:12
10118/2019
1.50
PROD1
DRILL
TRIP
P
Continue RIH, PUW = 36K @window,
___11,152.0
11,680.0
19:12
20:42
Stack weight at window @ 10 fpm @
DTF (-11,685'), PU & spin bit, RIH at
15 fpm, no good (-11,688), PU spin
bit, pumps off, RIH @ 30 fpm, stack at
-11,686', PUW = 36K, oreint TF 15°
ROHS @ 30 fpm, stack at
orient TF 10° ROHS @ 20 fpm no-
good
10/18/2019
10/18/2019
0.80
PROD1
DRILL
CIRC
T
Confer with town, work plan forward
11,680.0
11,680.0
(no 2.74" crayola mills on slope),
20:42
21:30
decison made to POOH for 0.5° AKO
motor, 2.74" string reamer & 2.74"
DSM
10/18/2019
10/18/2019
2.00
TROD,
DRILL
TRIP
T
POOH, tag up, PJSM
_-7-1-680.0
78.0
21:30
TO8/2019
23:30
10/19/2019
0.50
PROD1
DRILL
PULD
T
Begin PUD BHA#3
78.0
78.0
23:30
10/19/2019
00:00
10/19/2019
0.70
PROD1
DRILL
P_
T
Complete PUD BHA #3, considerable
78.0
-78.0
0.0
marking on motor, marks are LS below
00:00
00:42
wear -band & HS above wear -band,
possible binding up in window with
motor
10/19/2019
10/19/2019
1.00
PRODi
DRILL
PULD
T
PD BHA# -4 Window Dressing
0.0
63.0
Assembly (0.5° AKO motor, 2.74"
00:42
01:42
string reamer, & 2.74" DSM), slide in
cart, check pack -offs, MU to coil, tag
up, set counters
10/19/2019
-1 70/19-12019
-2 00
PR0D1
DRILL
TRIP
T
RIH w/ BHA#5 Window Dressing
63.0
11,075.0
01:42
03:42
Assembly
10/19/2019
10/19/2019
0.20
PROD1
DRILL
DLOG
T
Log K1 for +13.5' correction
11,075.0
11,137.0
03:42
03:54
DRILL
TRIP
T
Continue RIH to window, PUW - 37K
11,137.0
11,684.0
10/19/2019
10/19/2019
0.20
PR0D1
03:54
10/19/2019
04:06
10/19/2019
0.60
FRO D1
DRILL
REAM
T
Dress window, FS = 488 psi @ 1.9
11,684.0
11,684.0
bpm, mill at 1 fpm from 11,684' on
0406
04:42
initial pass (oriented 5' ROHS),
observe -90 psi motor work at
-11,686.8', then clean to past bottom
of window to11,700', back -ream at 5°
ROHS, perform an addiontal as milled
pass (down & up), clean both ways
10/19/2019
10/19/2019
1.10
PROD1
DRILL
REAM
T
Dry drift window up & down, 30 fpm,
11,684.0
11,684.0
04:42
05:48
clean
Perform additonal reaming passes,
35R, 335R, & 185R, dry drift, clean up
& down
Page 3/17 Report Printed: 111612019
- Operations Summary (with Timelog [Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
smn Depth
Stan Tune
EM Tana
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -x
Operation
(ft)(8)
End Depth (ft)(e)
10/19/2019
10/19/2019
1.90
PROM
DRILL
TRIP
T
POOH
11,684.0
60.0
05:48
07:42
10/19/2019
10/19/2019
1.00
PROM
DRILL
PULD
T
At surface, Tag up and space out.
60.0
0.0
07:42
08:42
PJSM, PUD BHA #4 Window dressing
BHA
10/19/2019
10/19/2019
0.80
PROM
DRILL
PULD
T
M/U and PD BHA #5 Lateral drilling
0.0
78.3
08:42
09:30
BHA with .5" motor and DynaPilot Bi
center bit
10/1912019
10/19/2019
2.00
PRODt
DRILL
TRIP
T
RIH BHA# 5, Shallow test agitator @
78.3
11,111.0
09:30
11:30
1500'-
Good
10119/2019
10/1912019
0.30
PROM
DRILL
DLOG
T
Log K1 for +18'correction, PUW=33K
11,111.0
11,140.0
11:30
11:48
10/19/2019
10119/2019
0.10
PROM
DRILL
TRIP
T
Continue in well. Clean pass through
11,140.0
11,740.0
11:48
11:54
window
10/1912019
10/19/2019
0.10
PRODt
DRILL
DLOG
P
Log MADD Pass
11,740.0
11,757.0
11:54
12:00
10/19/2019
10/19/2019
1.60
PROD1
DRILL
DRLG
P
11757', Drill, 1.88 BPM @ 4765 PSI
11,757.0
11,889.0
12:00
13:36
FS, BHP=4155, RIW=10.8K,
DHWOB=I.9K Swap mud to system 1.
New mud at bit 11,795'
10/19/2019
0.10
PROD1
DRILL
WPRT
P
11,866, BHA wiper, PUW=37K. New
11,889.0
11,889.0
13:42
mud around got pressures
10/19/2019
2.20
PROD1
DRILL
DRLG
P
11889', Drill, 1.92 BPM @ 4870 PSI
11,889.0
12,155.0
15:54
FS, BHP=4200, RIW=10.81k,
r36
DHWOB=2.3K. Trouble getting angle
to drop from 11970. Lower pump rate
and increase WOB.
10119/2019
080
PRODi
DRILL
WPRT
P
Pull wiper to 11715. Firs/ wiper after
12,155.0
12,155.0
16:42
drilling 400'. PUW=38K. Trip in slowly
waiting to obtain polygon extension
10119/2019
10/19/2019
1.30
PROD1
DRILL
DRLG
P
12155', Drill, 1.87 BPM @ 4810,
12,155.0
12,355.0
16:42
18:00
1 BHP=4219
10/19/2019
10/19/2019
3.30
PROD1
DRILL
DRLG
P
Drilling, PUW = 38K (obtain
12,355.0
12,497.0
18:00
21:18
parameters), FS = 1100 psi @ 1.9
bpm, CWT = 4K on bottom, WOB =
2.51K, annular = 4224 psi (11.85 ppg @
window), WHIP = 160 psi, pump =
5133 psi, drilling slowed at 12,369',
avg ROP = 43 fph
10/19/2019
10/2012019
2.70
PROD1
DRILL
DRLG
P
Drilling, CWT = 6.7K @ 3.8K WOB,
12,497.0
12,520.0
21:18
00:00
annular = 4232 psi (11.85 ppg @
window), WHIP = 204 psi, pump =
5098 psi, pump sweeps as required,
PUW = 38K from 12,504', pump 10 x
10 (LoVis with 2.5% DrillZone to aid wl
bit balling), allow pill to exit with bit
spinning off bottom, pump 5x5
sweeps, avg ROP = 8.5 fph
1012012019
0.50
PROM
DRILL
WPRT
P
Wiperto tubing tail, PUW = 35K, jog
12,520.0
11,700.0
00:30
7" casing
10/20/2019
0.10
PROD1
DRILL
DLOG
P
Log RA for+5'correction
11,752.0
00:
r10/20/2019
10/20/2019
0.40
PROD1
DRILL
WPRT
P
Wiper in-hole, RIW = 12K
12,520.0
01:00
10/2012019
1.30
PROM
DRILL
DRLG
P
Drilling, FS = 1154 psi @ 1.9 bpm,
r12,520.0
12,575.0
02:18
CWT = 12K @ 0.6K WOB, annular =
4224 psi, WHIP = 193 psi, pump =
4972 psi, drilling break at -12,575'
10/20/2019
10/20/2019
2.50
PROD1
DRILL
DRLG
P
Drilling, CWT= 11.4K, WOB= 1K,
12,668.0
02:18
04:48
annular = 4240 psi, WHP = 208 psi,
pump = 5138 psi, avg ROP = 37 fph
10/2012019
10/20/2019
0.10
PROW
DRILL
WPRT
P
BHA wiper, PUW = 40K, RIW = 11.31K
12,668.0
12,668.0
04:48
04:54
Page 4117 Report Printed: 1116/2019
operations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
DRLG
Time P -T-%
P
Operation
Drilling, FS = 1121 psi @ 1.9 bpm,
(0K13)
12,668.0
End Depth (MB)
12,746.0
10/20/2019
10/20/2019
2.00
PR0D1
DRILL
04:54
06:54
CWT = 10.2K @ 1.9K WOB, annular =
4249 psi, WHP = 190 psi, pump -
5173 psi
10/20/2019
10/20/2019
0.30
PROM
DRI
WPRT
P
12746, BHA wiper, PUW=40K
12,746.0
12,746.0
06:54
07:12
10/20/2019
10/20/2019
4.00
PROM
DRILL
DRLG
P
12746', Drill 1.88 BPM @ 5000 PSI
12,746.0
12,950.0
07:12
11:12
FS, BHP=4165, RIW=11K,
DHWOB=IK
10/20/2019
10/20/2019
0.50
PROM
DRILL
WPRT
P
1000' wiper trip #1, PUW=40K. Some
12,950.0
12,950.0
11:12
11:42
slight stacking @ 12600-12700 Lower
speed / Rate slightly
10/20/2019
10/20/2019
2.80
PROD1
DRILL
DRLG
P
12950', Drill, 1.88 BPM @ 5000 PSI
12,950.0
13,105.0
11:42
14:30
FS, BHP=4160
10/20/2019
10/20/2019
0.10
PROD1
DRILL
WPRT
P
BHA wiper, PUW=40K
13,105.0
13,105.0
14:30
14:36
10/20/2019
10/20/2019
1.50
PROD1
DRILL
DRLG
P
13105'. Drill, 1.88 BPM -@5085 PSI
13,105.0
13,193.0
14:36
16:06
FS, BHP=4245
10/20/2019
10/20/2019
0.10
PROD1
DRILL
WPRT
P
BHA Wiper, PUW=39K, RIW=BK
13,193.0
13,193.0
16:06
16:12
10/20/2019
10/20/2019
1.80
PRODi
DRILL
DRLG
P
13193', Drill, 1.88 BPM @ 5065 PSI
13,193.0
13,302.0
16:12
18:00
FS, BHP=4274,
10/20/2019
0.70
PROW
DRILL
DRLG
P
Drilling, CWT = 1.9 K @ 1.5K WOB,
13,302.0
13,350.0
18:00
annular = 4277 psi, WHP = 116 psi,
pump = 5272 psi, pump 5x5 sweeps
10/20/2019
1.00
PRODi
DRILL
WPRT
P
Wiper to tubing tail, PUW = 40K, begin
13,350.0
11,623.0
1842
F
pulling heavy at -12,880', up to -6K (at
12,791') WOB & 62K CWT, observe
motorwork, jog 7" casing
(pull heavy to varying degrees from
-12,600' to -12,860', then return to
normal weights)
10/20/2019
10/20/2019
0.10
PROD1
DRILL
DLOG
P
Window PUW = 37K, log RA for+9.5'
11,623.0
11,724.0
19:42 -
19:48
correction,
10/20/2019
10/2012019
0.70
PROD1
DRILL
WPRT
P
Wiper in-hole
11,724.0
13,350.0
19:48
20:30
12,616' stack weight, PUW = 43K, -1K
WOB, reduce rate to 1 bpm, stack at
12,605' (2.5K WOB), reduce rate to
0.9 bpm, 20 fpm, stack at 12,682' (2K
WOB) & 12,693', reduce to 0.8 bpm,
stack weight at 12,685', reduce speed
to 6 fpm, work to 12,970', begin
increasing rate & RIH speed at
12,970'.
Recap: Difficulty RIH 12,615'to
12,970', -15 fpm @ 1 bpm to get
down
10/20/2019
10/20/2019
0.50
PROD1
DRILL
WPRT
P
Wiperback up -hole, attemptto
13,350.0
12,610.0
2030
21:00
cleanup 12,970' to 12,615', 1.9 bpm,
15-25 fpm, pull to 55K, at 12,986',
12,678' negative WOB tug, observe
motor work, hole appears to be
cleaning up
10/20/2019
10/20/2019
0.70
PROD1
DRILL
WPRT
P
Wiper in-hole, stack at 12,612', 1.0 -
12,610.0
12,350.0
21:00
21:42
1.2 bpm @ 10-25 fpm, attempt to
increase rate at speed once past
12,970', stacked weight at 13,179'
RIW off bottom = 1.8K
Page 5117 ReportPrinted: 111612019
Uperations Summary (with Timelog Depths)
AV
1 R-23
Job: DRILLING SIDETRACK
Rig: NABORS CDR3-AC
Time Log
scan Depth
StartTime
End Time
Our (hr)
Phase
Op Code.
Activity Code Time
P -T -X
Operation
(ftKB) End
13,350.0
Depth (ftKB)
13,467.0
10/2012019 10/21/2019
2.30 PROD1
DRILL
DRLG P
CWDrillT=
28K@30.9K OB9 annular=
21:42 00:00
4241
psi, WHP = 92 psi, pump = 5202
psi,
avg ROP - 50 fph
1012112019
1.80
PROD1
DRILL
DRLG
P
___f3_,_467.0
13,569.0
10/21/2019
CWT'Drillino2K@ iK2WOB, annular=
00:00 01:48
4260 psi, WHIP = 127 psi, pump =
5236 psi, swap to new mud system
#2, new mud hits bit at 13,530'
DRILL
DRLG
P
New mud around, PUW = (new
13,569.0
13,750.0
10/21/2019
10/21/2019
3.20
PROD1
FS -10642K
ps
I=p3K@1K
01:48
05:00
n186 bpm, CWTaramete
WOB!@
annular = 4263 psi, WHIP = 278 psi,
pump = 4910 psi, pump 5x5 sweeps
10/21/2019
10/21/2019
0.80
PROD1
DRILL
WPRT
P
per up -hole, PUW=42K
13,750.0
13,750.0
05:00
05:48
DRLG
P
13750', @ 4937 PSI
13,750.0
13,928.0
10/21/2019
10/21/2019
3.70
PROD1
DRILL
FS, Dr43048RIWM
05:48
09:30
DHWOB=I.2K
10121/2019
7012112019
0.10
PRODt
DRILL
WPRT
P
BHA Wiper, PUW=45K
13,928.0
13,928.0
09:30
09:36
DRLG
P7—
13 1 BPM @ 4937 PSI
13,928.0
14,074.0
10/21/2019
10/21/2019
4.00
PROD1
DRILL
551087
gHP=rill,
09:36
13:36
1.10
PRODI
DRILL
WPRT
P
500'3K
14,074.0
14,074.0
10/21/2019
10/21/2019
up. SPng RIH
Good coming,Pull Stacking
13:36
14:42
Reduce pump rate to .8 BPM. Reduce
speed - 15 FPM. No DHWOB
—1
DRILL
DRLG
P
Dill, 9 io
14,074.0
14,088.0
10/21/2019
10/21/2019
10
PRODII
FS, BHPr4320814074',
070 ROPtdown 5
14:42
15:48
- 10 FPH from 30 to 50 FPH
1.30
PROD1
DRILL
WPRT
P
Stacking, Go to P/U. Very sticky,
14,088.0
11,642.0
10/21/2019
10/21/2019
Pp . Pull wiper to window with
15 48
17.06
s, 1 12,970 to 12,615 Ratty with
sweeps,
over pulls. Packing off coming up,
become detained @ packed off at
11,642', lose returns
0.30
PROD1
DRILL
CIRC
P
Work pipe a bit, pump down 8
11,642.0
11,642.0
10/21/2019
10/21/2019
pressure up backside, work pipe
17:06
17:24
down, become freeturns, regain re
10/21/2019
3.10
PROD1
DRILL
WPRT
P
Pump 5x5 sweeps, circulate bottoms
11,642.0
78.0
10/21/2019
x10 sweeps, cleanup
up,made
17:24
20:30
matle to wiperto swab to clean up
cased hole
10/21/2019
-i-0/-2-1/201 9
2.00
PROD1
DRILL
WPRT
P
Wiper in-hole
78.0
11,100.0
2030
22:3011,100.0
10/21/2019
—0 T0
PR0D1
DRILL
DLOG
P
Log K1 Tor +13'
11,124.0
10/21/2019
22:30
22:36
10/21/2019
0.80
PR0D1
DRILL
WPRT
P
tack weight at 116813 PU&roll 6K at cow,
11'124.0
__T1__682.0
10/21/2019
2236
23:24
pumps, stack at 11,685', bring on
pump, jog 7", attempt to clean up near
TOWS, stack again at 11,685', attempt
at 0.25 bpm, stack at 11,683', attempt
20° R from as milled TF, stack at
11,683', attempt 15° LOHS, no good,
confer with town, decision made to
POOH for cleanout assembly
0.60
PROD1
DRILL
TRIP
T
p sweeps, open EDC, begin
11,682.0
9,648.0
1012112019
10/22/2019
Pu
23:24
00:00
PROD1
DRILL
TRIP
T
Continue POOH, tag up, PJSM
9,648.0
78.0
10/22/2019
10/22/2019
1.60
00:00
01:36
DRILL
PULD
T
PUD BHA#5, bit came out packed off
78.0
0.0
10/22/2019
10/22/2019
0.90
PROD1
with clay, 2 plugged nozzles, & 10
01:36
02:30
chipped/broken reamer cutters
Page 6117
Report Printed:
1116/2019
Operations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Cade
Time P-T-X
Operation
PD SHA Assembly (0.5°
pflKB)
0.0
End Depth(ItKB)
72.0
10/22/2019
10/22/2019
1.20
PROD1
DRILL
PULD
T
AKO motor & 2.74" D331 ridge-set),
0230
03:42
slide in cart, MU to coil, check pack-
offs, MU to coil
10/22/2019
10122/2019
2.00
PROD1
DRILL
TRIP
T
RIH w/BHA#6
72.0
11,100.0
0342
10/22/2019
05:42
10/22/2019
0.10
PROD1
DRILL
DLOG
T
Log K1 for-13', PUW=38K
11,100.0
11,117.0
0542
05:48
10/22/2019
0.20
PROD1
DRILL
TRIP
T
Continue in well. Line up to 5° ROHS,
11,117.0
11,694.0
10/22/2019
pumping 1.9 BPM @ 4680 PSI
05:48
06:00
FSStack out @ 11694 with motorwork
and reactive torque
10/22/2019
10/22/2019
2.70
7R0D1
DRILL
CTOP
T
PUW=37K PUH, RBIH to 11699,
11,694.0
11,800.0
Stack with motor work, PUH, Recip
06:00
08:42
back to 11699. Recip with sweeps,
RBIH stack with motor work @ 11703.
PUH to 11651. Pump sweeps RBIH
pass 11,700 to 11,800'
10/22/2019
10/22/2019
0.50
PROD?
DRILL
CTOP
T
11,800 to 12,600 fairly clear Set down
11,800.0
12,600.0
@ 12603. Reip to TT
08:42
10/22/2019
09:12
10/22/2019
1.90
PROD1
DRILL
CTOP
T
Word from town. Set anchor billet @
12,600.0
12,400.0
-12,190. PUH and work hole 12,400
09.12
11:06
to TT with sweeps
10/22/2019
10/2212019
3.00
PROD1
DRILL
TRIP
T
Trip out for OH anchor billet
12,400.0
65.0
1106
10/22/2019
14:06
10/22/2019
1 A0
PROD1
DRILL
PULD
T
At surface, Tag up and space out,
65.0
0.0
PJSM, PUD BHA#6 Mill out 2.73" No
1406
15:12
Go
10/22/2019
10/22/2019
0.90
PROD1
DRILL
PULD
T
Reconfig
/M/U #oil end th OH
0.0
82.3
anchor billet. PD,A.
to
1512
16:06
surface test. Stab on well. Tag up and
space out
10/22/2019
10/22/2019
2.10
PR0D1
DRILL
TRIP
T
Trip in hole 3HA#7 Anchor billet. EDC
82.3
11,100.0
1606
10/22/2019
18:12
10/22/2019
0.10
PROD1
DRILL
DLOG
T
open
Log K1 for+ 12.5', PUW=38K
11,100.0
11,131.0
1812
10/22/2019
18:18
10/22/2019
0.50
PROD1
DRILL
TRIP
T
Continue in well, Close EDC @ 11638
11,131.0
12,201.8
Clean pass through window down to
1818
18:48
set depth @ 12201.8 oriented to 10°
ROHS
10/22/2019
10/22/2019
0.10
PROD?
DRILL
CTOP
T
At set depth and orientation. PU to
12,201.8
12,201.8
35K. Bring pumps online. See tool
1848
18:54
shift @ 5100 PSI. Set down 5K on
anchor
10/22/2019
10/22/2019
2.20
PROD1
DRILL
TRIP
T
Trip out after setting billet, PUW=39K,
12,201.6
65.0
Open EDC in cased hole
1854
10/2212019
21:06
1212019
0/2
0.90
PROD?
DRILL
PULD
T
Ta g up and space out, PUD BHA#7
65.0
0.0
billet setting tools
21:06
10/22/2019
22:00
10/2212019
0.80
PROD1
STK
PULD
T
PD BHA#8 (NOV agiator, 0.5°, & RB
0.0
78.0
22:00
10/22/2019
22:48
10/23/2019
1.20
PROD1
STK
TRIP
T
Cl)
RIH w/ BHA#8, shallow test agitator,
78.0
6,100.0
dp = 1180 psi, good action at surface
22:48
10/23/2019
00:00
10/23/2019
0.90
PR0D1
STK
TRIP
T
RIH w/BHA #8
6,100.0
11,100.0
00:00
10/23/2019
00:54
10/23/2019
0.10
PROD1
STK
DLOG
T
Log K1 for +13' correction
11,100.0
11,123.0
00:54
10/23/2019
01:00
10/23/2019
1.20
PROD1
STK
TRIP
T
Confine RIH, PUW =39K @window,
11,723.0
12,189.4
re-boot BHI direction software, unable
01:00
02:12
to orient, trouble-shoot, resolve issue,
clean through window, dry tag TOB at
12,191', bring on pumps, RBIH to mill
Page 7/17 ReportPrinted: 11/6/2019
Uperations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Used,
Start Time
End Time
our(hr)
Phase
Op Code
Activity Code
Time P -T -X
T
Operaton
FS = 1205 @ 1.9 bpm, begin
(ftKB)
12,189.5
End Depm(ftKe)
12,190.5
10/23/2019
10/23/2019
0.80
PROD1
STK
KOST
psi
milling on billet at 12,189.5', oriented
02:12
03:00
330° ROHS
I ft/hr for 1 ft
CWT = 15 SK, WOB = 0.31K, pump =
5126 psi
10/23/2019
10/23/2019
0.50
PROD,
STK
KOST
T
Go to 2 ft/hr for 1 it
12,190.5
12,191.5
0300
10/23/2019
03:30
10/23/2019
0.40
PROD7
STK
70 -ST
T
Go to 3 ft/hr for 1 ft
12,191.5
12,192.5
03:30
10/23/2019
03:54
10/23/2019
0.40
PROD1
STK
KOST
T
Begin pushing on it, looking for WOB
12,192.5
12,202.0
to gain departure (10 fph), CWT =
0354
04:18
13.1 K, WOB = 1.1 K, pump = 5162 psi,
increase to 15 fph, come up to 20 fph,
go to 30 fph, go to 60 fph, off billet
10/23/2019
10/23/2019
0.70
PROD1
DRILL
DRLG
T
Drilling, CWT = 12.2K, WOB = 1.3K,
12,202.0
12,290.0
annular = 4210 psi, WHP = 233 psi,
04:18
05:00
pump = 5258 psi, pump 5x5 sweeps
10/23/2019
10/23/2019
0.30
PROD,
DRILL
WPRT
T
PUW = 39K, dry drift billet area up &
12,290.0
12,290.0
05:00
05:18
down, clean
10/23/2019
10/23/2019
3.00
PRODt
DRILL
DRLG
T
Drilling, FS = 1195 psi @ 1.9 bpm,
12,290.0
12,465.0
CWT = 11.5K @ 2.7K WOB, annular =
05:18
08:18
4216 psi, WHP = 196 psi, pump =
5534 psi, avg ROP = 58 fph
10/23/2019
10/23/2019
3.20
PROD,
DRILL
DRLG
T
Drilling, CWT = 9.4K @ 2.61K WOB,
12,465.0
12,590.0
annular= 4222 psi, pump = 5441 psi,
08:18
11:30
PUW = 39K from 12,521', avg ROP =
39 fph
10/23/2019
10/23/2019
0.40
PR0D1
DRILL
DRLG
T
Wiper up -hole, PUW = 40K
12,590.0
11,790.0
11:30
10/23/2019
11:54
10/23/2019
0.40
PROD1
DRILL
WPRT
T
ettdownrough
,per n hole,atty 212
11'790.0
12,590.0
7 515', RIW
11:54
12:18
= 11.SK
10/23/2019
10/23/2019
3.20
PROD,
DRILL
DRLG
T
W
Drilling, FS = 1359 psi, CT = 10.7K
12,590.0
12,849.0
@ 3.2K, annular = 4227 psi, WHP =
12:18
15:30
167 psi, pump = 5535 psi, pump 5x5
sweeps as required, PUW = 43K from
12,849', avg ROP = 81 fph
10/23/2019
10/23/2019
1.10
PR0D1
DRILL
DRLG
T
Drilling, CWT = 9.8K @ 1.1 K WOB,
12,849.0
12,923.0
annular = 4233 psi, WHP = 115 psi,
1530
16:36
pump = 5555 psi, avg ROP = 67 fph
10/23/2019
10/23/2019
0.20
PROD1
DRILL
WPRT
T
BHA wiper, PUW = 43K, grab missed
12,923.0
12,923.0
1636
10/23/2019
16:48
10/23/2019
1.40
PROM
DRILL
DRLG
T
survey
Drilling, FS = 1350 psi @ 1.9 bpm,
12,923.0
13,010.0
CWT = 11.5K @ 1.25K WOB, annular
16:48
18:12
= 4200 psi, pump = 5577 psi
10/23/2019
10/23/2019
0.70
PRODI
DRILL
WPRT
T
TU Wt 41 k lbs, - clean, PUH slowly
13,010.0
11,668.0
waiting for sweeps to exit the bit -
18:12
18:54
chase sweeps up hole on 2 nd wiper
to the 7" @ 18:23. Slight neg WOB
drag until above 12,236'. No significat
overpulls, Billet and window clean.
10/23/2019
10/23/2019
0.70
PROD1
-[5R-ILL
CI RC
T
Pack off in the 7", Bit depth 11,641'
11,668.0
11,644.0
Bow rate out dropped from 79 gpm to
1854
19:36
a low of 66 gpm. RBIH, work pipe,
regain returns. Send 5x5 sweep,
while joging 7", send second 5x5,
significant cutting at the shaker, no
rocks. Chase bottoms up.
pullled through window @ 0.55 bpm
and 10ft/min.B
Page 8/17 Report Printetl: 11/6/2019
Operations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Start TIT.
End Time
Dur (ho
Phase
Op Code
Activity Code
T
Time P -T -X
operator
RBIwi er tip. set
(WB) End
11.644.0
Depth (WB)
11,092.0
10/23/2019 10/23/2019
0.30
PROD1
DRILL
CIRC
down
twico e @ H1 n
19:36 19:54
Pump 5x5 while PUH to tie in.
PR0D1
DRILL
DLOG
T
Tie into the Kt fora + 13' correction.
11,092.0
11,141.0
10/23/2019 10/23/2019
0.20
19:54 20:06
CIRC
T
pas window, set
11,141.0
11,647.0
10/23/2019
10/23/2019
0.40
PROD1
DRILL
down @(11,693'
20:06
20:30
PUH park and open EDC, launch 5x5
x2
PROD1
DRILL
CIRC
T
Chase sweeps to EDC while jogging
11,647.0
11,608.0
10/23/2019
10/23/2019
0.60
20:30
21:06
10/23/2019
2.00
PROD1
DRILL
TRIP
T
. Lots f
chasing sbillet
11.608.0
71.0
10/23/2019
cuttings nd aluminum n
21:06
23:06
sweeps, jog hole at 500'. more
aluminum at surface. Blew down MM
and chokes. Open, inspect and clean
choke.
- 1 bbl of returns on the trip.
10123/2019
10/23/2019
0.80
PR0D1
DRILL
PULD
T
PUD BHA
Bit balled p, packed with clay and
71.0
0.0
2306
23:54
some smallll r rocks, two plugged
nozzles.
10/2312019
10/24/2019
0.10
PROD(
DRILL
BOPE
T
Function test B OPE
0.0
0.0
2354
10/2412019
00:000.0
10/2412019
0.20
PROD(
DRILL
BOPE
T
Function test 80PE
0.0
0000
00:12
PULD
T
PD BHA#9, cleanout assembly, 0.5°
0.0
71.9
10/24/2019
10/24/2019
0.90
PROD?
DRILL
motor w D331 ridgeset bit.
0012
10/24/2019
01:06AKO
10/2412019
1.90
PROD1
DR ILL
TRIP
T
RIH
71.9
11,100.0
O1t06
03:00
DRILL
DLOG
T
Tie into the Kl for+ll'
11,100.0
11,130.7
10/24/2019
10/24/2019
0.10
PROD1
03:00
03:06
-[TL-OG
T
Closeto RIH, PU Wt @
11,130.7
11,693.0
10/24/2019
10/24/2019
0.30
PR0D1
DRILL
647 3D8 k continue
03:06
03:24
Stage two sweeps
0.30
PROW
DRILL
WASH
T
CT 4599 psi @1.9 bpm in/out, free
11,693.0
11,716.0
10/24/2019
10/24/2019
sping diff 560 psi, BHP 4143 psi, WH
03:24
03:42
160 psi, IA 489 psi, OA 0 psi. CT Wt
12 k Ibs.
Work down hole, slight motor work
and WOB @ 11,699'. WOB increased
to 3 k Ibs with motor work @ 11,714',
broke back then increased again by
11,716'
2.50
PRODi
DRILL
WASH
T
ging,
starttl5
kt
o @ H1
11,716.0
11,680.0
10/24/2019
10/2412019
WOWt
-7 i8 lbs 703'k
0342
06:12
overpull on CT Wt, packing off, work
pipe, regain returns, pull to casing.
RBIH to 11,720', some motor work &
WOB. PU, 39 k lbs. Pull to casing,
clean. Continue to Clean out taking
10' bites to 11,780', ciruculate bottoms
up, dry drift window, full rate down to
11,780', clean
2.70
PROD1
DRILL
WPRT
T
Open EDC, pump 10x10 sweeps @ 2
11,680.0
72.0
10/24/2019
10/24/2019
bpm, POOH, PJSM
06:12
08:54
DRILL
PULD
T
PUD BHA#9, mill came out 2.73" no-
72.0
0.0
10/24/2019
10/24/2019
0.80
PRODi
08:54
09:42
1.20
PROD(
DRILL
PULD
T
90
PO BHA#10 Drilling by (NOV
0.0
78.0
10/24/2019
10/24/2019
otor, &
Agitator, motor, & Cl bit),
09A2
10:54
slide in cart, check pack -offs, MU to
art, cheAKOck
coil,tag up, set counters
'a'
2.00
PROD1
DRILL
TRIP
T
RIH shallow test, up=
78.0
11,100.0
10/24/2019
10/24/2019
1300 psi, pump = 4910 psi, good
1054
12:54
Report Printed:
1116/2019
Page 9117
Operations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Start Time
End Time
Mthr)
Phase
—OD
Op Code
Activity Code
DLOG
Time P -T -X
7
Operation
Lag K1 for 11.5, PUW = 35K
(ftKB)
11,100.0
End Depm(ftKB)
11,131.0
14/2019
0/2
0/24/2019 1
0.10
PRI
DRILL
1254
10/24/2019
13:00
10/2412019
0.70
PROD1
DRILL
TRIP
T
Continue RIH, stack at 11,6821, PU &
11,131.0
13,010.0
13:00
13:42
get right through window clean, begin
sending new mud (system #3), stack
weight at 12,385', stack again at same
depth, PU & work through at 0.8 bpm
& 25 fpm, stack at 12,434' (PUW =
47K)
Bore pressuring up, 1 -for -1 returns
(likely plugged no=tes), begin pulling
-14K WOB, —12,420', can orient (slight
amperage increase), free pipe pulling
to 70K, pump sweeps
10/24/2019
10/24/2019
0.70
TR
DRILL
DRLG
T
PUH to BOW, jog build, pull through
13,010.0
11,642.0
window (0.5 bpm @ 10 fpm), jog 7",
13:42
14:24
pump sweeps, circulate bottoms up
(w/ new mud)
10/24/2019
10/24/2019
0.90
PROD1
DRILL
TRIP
T
RBIH, stack at 11,679, roll bit, stack
11,642.0
12,385.0
1424
15:18
again (3X), circulate sweeps to
surface, clean through window, clean
past billet,
10/24/2019
10/24/2019
1.20
PROD1
DRILL
TRIP
T
Continue RIH @ 1.9 bpm, stacked at
12,385.0
12,440.0
12,385', work down taking bites, work
15:18
16:30
to 12,396', PU, clean, RBIH, work to
12,416', PU, begin seeing weight at
12,396', losing hole, appears to be
caving, continue working down to
12,420', PUW = 43K, 5K overpull at
12,386, begin seeing weight at
12,403', work to 12,445', PU,
work/"drill" to get back to 12,445', work
to 12,469'
10/24/2019
10/24/2019
1.90
PRODt
DRILL
TRIP
T
Become detained at 12,440, �full
12,440.0
11,631.0
70K ( 13K WOB), work
16:30
18:24
pipe free, pump sweeps, pull to BOW,
jog build until full bottoms up of
sweeps, pull through window at 0.5
bpm @ 10 fpm, jog 7" pumping
sweeps, chase bottoms up.
10/24/2019
10/24/2019
0.20
PROD
DRILL
TRIP
T
RIH, attempt to dry drift w1ndow@20
11,631.0
11,673.0
18:24
18:36
ft/min, SD @ 11,683', PU 43 k lbs.
PU, RBIH and pass window cleanly.
WOB spike to 2 k @ 11,702', fell off
continued on in hole to 11,760' EOB.
PUH through window- clean.
10/24/2019
10/24/2019
2.30
PROD1
DRILL
TRIP
T
POOH spinning the bit, 1.9 bpm in and
11,673.0
61.7
1.45 bpm out. jog the tubing at 500'.
1836
10/24/2019
20:54
10/24/2019
1.40
PROD1
DRILL
PULD
T
Bump up, space out PUD BHA# 10.
61.7
0.0
2054
22:18
"Bit came out 1-4 with most reamers
sheared off.
10/24/2019
10/24/2019
1.10
PROD1
STK
PULD
T
PD BHA#11, open hole anchored
0.0
72.9
2218
10/24/2019
23:24
10/25/2019
0.60
PRODt
STK
TRIP
T
billet.
RIH wbillet.
72.9
2,757.0
2324
10/ 25/2019
00:00
10/25/2019
1.20
PROD1
STK
TRIP
7
RIH w billet.
2,757.0
11,113.0
00:00
10/25/2019
01:12
10/25/2019
0.20
PROD7
STK
DLOG
T
Tie into the K1 marker for a 14
11,113.0
11,146.6
01:12
01:24
correction.
Page 10/17 ReportPrinted: 11/612019
Operations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Dept
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time 0.T -X
Operation
(ftKB)
End Depth (ftKB)
10/25/2019
10/25/2019
1.00
PRODt
STK
WPST
T
Continue in hole to 11,635, PU Wt 39
11,146.6
12,141.8
01:24
02:24
k lbs. Park in cased hole above
window, close EDC.
Attempt to RIH, SID @ 11,709, 5 k
WOB 45k PU, repeat 5 times, PU's
ranged from 40 to 47 k lbs. saw -2.6 k
WOB on one attempt. Rolled TF to
various orientations after second
stack.
After 6th attempt, RIH to 12,141.8'.
Orient TF to 210° ROHS, PU to
neutral weight online with the pump.
Saw shear @ 4800 psi, WOB climbed
to 1.4 k, set down to 4.3 k lbs - good
set
PU Wt 43 k lbs.
10/25/2019
10/25/2019
0.30
PROD1
STK
TRIP
T
PUH to cased hole.
12,141.8
11,499.0
02:24
02:42
10/25/2019
1025/2019
0.60
PROD1
STK
CTOP
T
Park and inspect fluid on off reel side
12,141.8
11,499.0
02:42
03:18
right angle drive.
1025/2019
10/252019
1.90
PROD1
STK
TRIP
T
Continue out of hole, PJSM
11,499.0
72.0
03:18
05:12
10/25/2019
10/25/2019
1.20
PR0D1
STK
PULD
T
PUD BHA #11, crew change
72.0
0.0
05:12
06:24
10/25/2019
1025/2019
1.10
PR0D1
STK
PULD
T
PD BHA#12, slide in cart, change out
0.0
78.0
06:24
07:30
pack -offs, MU to coil, tag up, set
counters
10/25/2019
1025/2019
0.10
PROD1
STK
TRIP
T
RIH w/ BHA#12, pump pressure
78.0
78.0
07:30
07:36
climbing, bore not climbing
10/25/2019
10/25/2019
0.40
PROD1
STK
PULD
T
Bleed off pump, Pop off, open DBV,
78.0
78.0
07:36
08:00
stab back on, complete PD
10/25/2019
10/252019
2.00
PROD1
STK
TRIP
T
RIH w/ BHA#12, shallow test tools,
78.0
11,100.0
08:00
10:00
1.9 bpm, pump = 4800 psi, dp = 1092
psi
10/25/2019
1025/2019
0.10
PROD1
STK
DLOG
T
Log Kt for+21'
11,100.0
11,119.0
10:00
10:06
10/25/2019
10/25/2019
0.60
PROD1
STK
TRIP
T
Continue RIH, PUW @ window = 37K,
11,119.0
12,130.4
10:06
10:42
clean through window, dry tag TOB
12,132', PUW = 41 K, bring up pumps
10252019
10/25/2019
2.30
PROD1
STK
KOST
T
Milling at 12,130.4', FS = 1021 psi @
12,130.4
12,131.0
10:42
13:00
1.9 bpm, pump = 4906 psi,
1 ft/hr for 1 ft
Stall at 12131.3', PUW = 42K, stall
again at 12,131.24', stall at 12131.0,
observe CWT climb while time milling,
difficulty getting restarted, stick
slipping, work down in 1110's to find
weight and get restarted, add
addilonal 1% 776 to system, creep
down to 12,131.04' and go into stall
10/25/2019
10/25/2019
0.80
PRODt
STK
_ROST _KOSTT
Continue attempting to get started,
12,131.0
12,130.6
13:00
13:48
awaiting addition of lubes in system,
stall again at 12,131.04', wiper up to
BOW, awaiting lubed mud to bit, RBIH
10/252019
10/25/2019
0.80
PROD1
STK
KOST
T
With lube all the way around, put in
12,130.6
12,131.4
13:48
14:36
auto driller at 1 ft/hr at 12,130.6'
10/25/2019
10/25/2019
0.50
PROD1
STK
KOST
T
Go to 2 ft/hr for 1 ft
12,131.4
12,132.4
14:36
15:06
10/25/2019
10/252019
0.30
PROD1
STK
KOST
T
Go to 3 ft/hr for 1ft
12,132.4
12,133.4
15:06
15:24
10252019
1025/2019
0.30
PR0D1
STK
ROST KOSTT
Go to 10 fuhr, go to 20 ft/hr
1,233.4
12,140.0
15:24
15:42
Page 11117 Report Printed: 111161201 9
Uperations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
startDepth
StartTime
End Time
Our (m)
Phase
Op Code
Activity Code
Time P -T -X
Operabon
Off billet, drilling ahead, 5x5
(ftKB)
12,140.0
End Depth(ftKB)
12,221.0
10/25/2019
10/25/2019
2.20
PROD1
DRILL
DRLG
T
pump
15:42
17:54
sweeps
Unload ODS PDL
10/25/2019
10/25/2019
0.10
PROD1
DRILL
WPRT
T
Dry drift billet up —& down, clean
12,221.0
12,221.0
1754
18:00
10/25/2019
10/25/2019
1.50
PROD1
DRILL
-CTR—LG
T
CT 5310 psi @ 1.9 bpm in and out, FS
12,221.0
12,271.0
1800
19:30
1127 psi, BHP 4189 psi - targeting
11.8 @ the window, CT Wt 11.5 k lbs,
WOB variable to 3 k lbs.
10/25/2019
10/2019
25/
1.50
PROD1
DRILL
WPST
T
PU on wiper#1, PU Wt 42 k lbs.
12,271.0
11,695.0
19:30
21:00
Decision made to come all the way to
the 7" post billet sidetrack.
Jog the build with sweeps timed out in
build and fight before exiting the
window.
Jog 7" and chase up hole with sweeps
RBIH
10/25/2019
10/25/2019
0.10
PROD1
DRILL
[LOG
T
Tie into the RA tag for +5.5' correction
11,695.0
11,728.0
21:00
21:06
10/25/2019
10/25/2019
0.40
PRODi
DRILL
WPRT
T
RBIH post wiper to window
11,728.0
12,271.0
21:06
21:30
10/25/2019
10/2512019
1.10
PROD1
DRILL
-5-RG
T
CT 5450 psi @ 1.90 bpm in&out, Free
12,271.0
12,371.0
21:30
22:36
spin 956 psi, BHP 4202 psi, OBD,
WOB to 3 k lbs,
Average ROP over interval 90 ft/hr
10/25/2019
10/25/2019
0.20
PROD1
DRILL
WPRT
T
PU on first short wiper 214' staying
12,371.0
12,371.0
22:36
22:48
below the billet, PU Wt 43 k lbs -
RBIH
10/25/2019
10/25/2019
0.60
PRODi
DRILL
DRLG
T
CT 5450 psi @ 1.90 bpm in&out, Free
12,371.0
12,494.0
22:48
23:24
spin 956 psi, BHP 4202 psi, OBD,
WOB to 3 k lbs,
PU - 12,443' to roll TF - 41 k lbs
Average ROP over interval 205 Whir
10/25/2019
10/26/2019
0.60
PROD1
DRILL
WPST
T
PU on wiper #2 - long wiper to window
12,494.0
11,713.0
23:24
0000
PU Wt 42 k lbs.
10/26/2019
10/26/2019
0.70
PRODi
DRILL
WPRT
T
Continue up hole on long wiper to the
11,713.0
11,699.0
00:00
00:42
window
Jog the build with sweeps timed out in
build and fight before exiting the
window.
Jog 7" and chase up hole with sweeps
RBIH
10/26/2019
10/2612019
0.10
PROD1
DRILL
DLOG
T
Tie into the RA tag for +3' correction
11,699.0
11,733.0
0042
00:48
10/26/2019
10/26/2019
0.30
PRODi
DRILL
WPR7
T
RBIH post wiper to window
11,733.0
12,494.0
00:48
01:06
10/26/2019
10/26 12019
2.10
FROM
D1
DRILL
DRLG
T
CT 5499 psi @ 1.90 bpm in &out,
12,494.0
12,632.0
01:06
03:12
Free spin 1042 psi, BHP 4210 psi,
OBD, WOB to 3 k lbs,
10/26/2019
10/26/2019
0.40
PROD1
DRILL
WPRT
T
PU on first short wiper 460' staying
12,632.0
12,632.0
03:12
03:36
below the billet, PU Wt 41 k lbs -
RBIH
10/26/2019
10/26/2019
2.40
PROD1
DRILL
-CTR—LG
T
CT 5649 psi @ 1.90 bpm in &out,
12,632.0
12,695.0
03:36
06:00
Free spin 1183 psi, BHP 4232 psi, WH
67 psi, IA 611 psi, OA 8 psi, OBD, CT
Wt 9.6 k lbs WOB to 2.2 k lbs
10/26/2019
1.50
PROD1
DRILL
DRLG
T
Drilling, CWT = 7K @ 2.8K WOB,
12,695.0
12,753.0
06:00
07:30
annular= 4257 psi, WHP = 70 psi,
110/26/2019
pump = 5848 psi, significant clay over
shakers, pump 2x2 sweeps
Page 12117 Report Printed: 11/6/2019
s . Operations Summary (with Timelog Depths)
}YYri..
1W 1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Stan Depth
Stan Time
End Time
Dur (hr)
Phase
Op Code
AMV,ty Code
Time P -T -x
T
Opemfion
Wipertotubing tail, PUW=40K, pump
(fiKB)
12,753.0
End Depth (flKB)
11,700.0
10I26I2019
10/26/2019
1.10
PRODI
DRILL
WPRT
5x5 sweeps, jog build, stack weight at
07:30
08:36
11,716', pull through window, jog 7",
jet
XN nipple
Stack at 11,688' (5.7K WOB), PUW =
45K, through window clean at 30 fpm
10/26/2019
10/26/2019
0.10
PROD1
DRILL
DLOG
T
Log RA tag for+5' correction
11,782.0
11,728.0
08:36
10/26/2019
08:42
10/26/2019
0.50 -P-R-0-0
i
DRILL
WPRT
T
Wiper in-hole, weight bobbles at
11,728.0
12,753.0
beginning at -12,730', RIW = 10K
08:42
10126/2019
09:12
10/26/2019
1.00
PROD1
DRILL
DRLG
T
Drilling, FS = 1150 psi @ 1.9 bpm,
12,753.0
12,850.0
CWT = 1 OK 2 1.4K WOB, annular =
09:12
10:12
4249 pis, WHIP = 18 psi, pump = 5784
psi, difficulty dropping Inc, lower to
1.75 bpm per DD request, avg ROP =
97 fph
10/26/2019
10/26/2019
0.40
PROD1
DRILL
WPRT
T
400' wiper up -hole, PUN = 38K, stack
12,850.0
12,850.0
10:12
10:36
weight at -12,650'- 12,675', RIW =
10.8K
10/26/2019
10/26/2019
2.20
PROD1
DRILL
TR
T
Drilling, FS = 940 psi _@7 bpm (rate
12,850.0 ___-7-2,950.0
to aid in dropping inclination), CWT =
1036
12:48
9.8K @ 1.2 WOB, annular = 4274 psi,
WHP = 53 psi, pump = 5187 psi, ROP
slows, avg ROP = 45 fph, pump 2x2
sweeps
10/26/2019
10/26/2019
1.10
PROM
DRILL
WPRT
T
to 2x2
12,950.0
11,700.0
fortEOB9 smlallWg pulliK,
tmietlror E ng past
1248
13:54
billet, tug at 11,754', partial pack
-off (minor), turn around 8 stack
12,708', PU, stack at 12,715' (pass
12,715' at 5 fpm), clean through
window, jet XN nipple, stack at
11,688' (2X),
10/26/2019
10/26/2019
0.10
PROD1
DRILL
DLOG
T
Log RA for +5' correction
11,700.0
11,723.0
13:54
10/26/2019
14:00
70/26/2019
0.60
PROD,
DRILL
WPRT
TWiper
ii erin(possista kat
11,723.0
12,950.0
per town
14:00
14:36
geology), get by at -1 bpm at 15-30
fpm, RIW = 9.9K
70/26/2019
10126/2019
1.20
PRODt
DRILL
DRLG
T
Drilling, FS = 1074 psi @ 1.9 bpm,
12,950.0
13,051.0
CWT = 12K @ 1 K WOB, annular =
14:36
15:48
4268 psi, WHIP = 15 psi, pump = 5805
psi
10/26/2019
10/26/2019
0.40
PROD1
DRILL
WPRT
T
400' wiper, PUW = 40K, -12,665,
13,051.0
13,051.0
RBIH, go to 1.2 bpm @ -25 fph from
15:48
16:12
12,660' - 12,700', stack weight at
12,738', PUW = 39, RIW = 10.5K
10/26/2019
10/26/2019
1.30
PROD1
DRILL
DRLG
T
Drilling, FS = 1144 psi @ 1.9 bpm,
13,051.0
13,151.0
CWT = 9.71K @ 0.9K WOB, annular=
16:12
17:30
4308 psi, pump = 5865 psi
10/26/2019
10/26/2019
1.40
PROD1
DRILL
WPRT
T
Wiper to tubing tail, PUW = 39. PUH
13,151.0
11,700.0
on long wiper to the window
1730
18:54
Draggy section from 12,697 - 12,297' -
0.3 to -.8 k lbs WOB w/motor work.
Pulled 15 k lbs over CT Wt w neg
WOB and packed off @ 11,758'
Worked pipe 4 times
Worked free, returns returned, RBIH to
11,811' PUH, -1k WOB tug @ 11,678'
Jet 7" pump 2x2 sweep. RBIH - clean.
Page 13117 Report Printed: 11/6/2019
Summary (with Timelog Depths)
1 R-23
lipoperations
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
$ten Time
End Time
Dur(hn
Phase
Op code
AcbvyCode
Time P -T -X
Operation
(fIKB)
End Depth(Wti)
10/26/2019
10/26/2019
0.10
FROM
DRILL
DLOG
T
Tie int the RA lag for a +5.5'
11,700.0
11,723.0
18:54
19:00
10/26/2019
10126/2019
0.80
FROM
DRILL
WPRT
T
RBIH post wiper to window.
11,723.0
13,151.0
19:00
19:48
12,643' set down PU W143 k lbs, -2.5
k WOB
12,664' WOB to 1.5k lbs
12,757' WOB to 1.2 k lbs
12,875' WOB to 3 K set down, PU Wt
38 k lbs, cut pump to 1.66 bpm -07 k
WOB
Continue in hole
10126/2019
10/26/2019
1.80
FROM
DRILL
DRLG
T
Ct 5834 psi, @ 1.9 bpm in/out. FS
13,151.0
13,252.0
19:48
21:36
1196 psi, BHP 4314 psi -targeting
11.8 @ the window, currently 12.36
ppg @ the bit. WH 78 psi - open
choke, IA 661 psi, OA 6 psi. Ct 10 k
falling to 0 over drilled interval. WOB
1.5 k Ibs.
10/26/2019
10126/2019
1.00
FROM
DRILL
WPRT
T
PU W142 k lbs, PUH on short wiper
13,252.0
13,252.0
21:36
22:36
#1
PUH to 12,843'-400'
RBIH, pull short jog/geo wiper to
discuss planforward for invert, RBIH
10/26/2019
10127/2019
1.40
PROD1
DRILL
DRLG
T
CT 5874 psi, 1.90 bpm in/out. Free
13,252.0
13,340.0
22:36
00:00
spin 1187 psi, BHP 4335 psi. Ct Wt 3
k lbs, WOB 1.3 k Ibs.
10/27/2019
10/27/2019
0.20
FROM
DRILL
DRLG
T
Continue to drill ahead.
13,340.0
13,350.0
00:00
00:12
10/27/2019
10/27/2019
1.60
FROM
DRILL
WPRT
T
PU W 44 k lbs, PUH on long wiper to
13,350.0
11,700.0
00:12
01:48
the window.
WOB to -3.3 k Ibs tug at 12,626'
Time first sweep to exit @ 11,800'.
Pull to 11,760' while sweep exits,
RBIH to 12,000'.
PUH cutting speed @ 11,740' letting
sweep exit. @ 11,720' cut pump to
0.55 bpm and pull @ 5 ft/min through
window in to 7"
-1 k WOB lug @ 11,678 while pulling
past the window
Jet 7" chase bottoms up. RBIH @ 30
11/min through window
5 ft/min once in open hole. 3K WOB
spike @ 11,685'
10/27/2019
10/27/2019
0.10
PRODt
DRILL
DLOG
T
Tie int the RA tag for a +7'
11,700.0
11,736.0
01:48
01:54
10/27/2019
10/27/2019
0.80
FROM
DRILL
WPRT
T
RBIH post wiper to window.
11,736.0
13,352.0
01:54
02:42
12,900' S/D w 2 k WOB, PU 41 k Ibs
13,157' S/D w 2.3 k WOB, PU 42 k Ibs
13,238' S/D 3 times, PU up to 46 k Ibs,
PUH, RBIH, cut rate to 0.5 bpm, 30
ft/min.
Walk rate up after 13,250 continue to
RIH
10/27/2019
10/27/2019
1.80
PROD1
DRILL
DRLG
T
Ct 5930 psi, @ 1.9 bpm in/out. FS
13,352.0
13,461.0
02:42
04:30
1148 psi, BHP 4360 psi - targeting
11.8 @ the window, currently 12.56
ppg @ the bit. WH 16 psi - open
choke, IA 648 psi, OA 8 psi. CT RIH
WT 9 k, OBD 2.5 k lbs, WOB 1.25 k
Ibs.
Page 14117 Report Printed: 11/6/2019
Uperations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Stan Time
End Time
our (hr)
Phase
Op Code
Atlivity Code
WPRT
Time P-T-X
T
Operation sBI
k13060u400' hurt wiper
(MB)
13,461.0
Entl Dept (MB)
13,461.0
10/27/2019
10/27/2019
0.40
PR0D1
DRILL
#1 Pl1tH9
04:30
04:54
Set down @ 13,156- PU proactively
cut rate from 1.9 to 1.56
Continue to RIH @ 40 fUmin
10/27/2019
10/27/2019
2.00
PROD1
DRILL
DRLG
T
CT 5935 psi, 1.89 bpm in/out. Free
13,461.0
13,560.0
spin 1111 psi, BHP 4338 psi. Ct Wt 6
04:54
06:54
k lbs, WOB 1.3 k lbs., pumps 2x2
sweeps
10/27/2019
10127/2019
1.30
PROD1
DRILL
WPRT
T
aIW06 412,660mp
13,560.0
11,700.0
swleepsoforrbEOBing
tug
06:54
08:12
clean past billet, jog build, small tug
through window, jog 7", RBIH through
window, setdown at 11,688', roll bit,
stack again at 11,683', again at
11,678' (3X), change TF, get through
at 5 fpm
10/27/2019
10/27/2019
0.10
PROD,
DRILL
DLOG
T
Log RA for +7 correction
11,700.0
11,718.0
08:12
10/27/2019
08:18
10/27/2019
1.10
PROD1
DRILL
WPRT
T
Wiper in-hole, clean past billet, reduce
11,718.0
13,560.0
rate & speed beginng 12,615', ratty
08:18
09:24
13,126'to 13,300', RIW =4K
10/27/2019
10/27/2019
1.90
PROD,
DRILL
DRLG
T
FS = 1088 psi @ 1.9 bpm, CWT =
7560.0
13,660.0
5.4K @ 0.8K WOB, annular = 4400
09:24
11:18
psi, pump = 5924 psi, choke wide
open, begin pumping mud system #4,
at the bit 13,592', avg ROP = 53 fph
10/27/2019
10/27/2019
0.70
PRODi
DRILL
WPRT
T
400' wiper, PUW = 42K, stacking at
13,660.0
13,660.0
13,544'- 13,589', RIW = 6K
11:18
10/27/2019
12:00
10/27/2019
2.00
PRODi
DRILL
DRLG
T
Drilling, FS = 1038 psi @ 1.9 bpm,
13,660.0
13,760.0
CWT = 4.3K @ 1.2K WOB, annular =
12:00
14:00
4291 psi, WHP = 92 psi, pump = 5418
psi, avg ROP = 50 fph
10/27/2019
10/27/2019
2.40
PROD1
DRILL
WPRT
T
Wiper to tubing tail, PUW = 44K,
13,760.0
11,100.0
pulled heavy at 12,700' & 12,626', jog
1400
16:24
build
Pull heavy at 11,738', RBIH, stack
weight, pressuring up annular, partial
pack-off (have returns), can orient,
pump 5x5 sweeps, work pipe, pop free
working down, RBIH, jogging awaiting
sweeps, stack on billet, run through to
verify clean, sweeps well up-hole, pull
through window (0.5 bpm @ 5 fpm),
jog 7", jet XN nipple, difficulty working
through window (5 set-downs)
10/27/2019
10/27/2019
0.20
PROD1
DRILL
DLOG
T
PUH & log K1 for+9.5'
11,100.0
11,136.0
16:24
10/27/2019
16:36
10/27/2019
0.50
PROD
DRILL
WPRT
T--RBIH,
stack at 11,688', orient TF 10°R
11,136.0
11,688.0
of milled, attempt rolling TF with WOB,
16:36
17:06
no good, pull up to 35K (1.3 WOB),
roll TF to "pop" through, no good,
attempt again at 30 fpm, no good, PU
pump for a bit in 7", attempt 20°L at 35
fpm
10/27/2019
10/27/2019
2.60
PRODt
DRILL
TRIP
T
PUW = 42K, pumps 5x5 sweeps,
11,688.0
72.0
1706
19:42
circulate bottoms up
POOH chasing sweeps to surface on
wiper trip.
Found some small cavings in the
returns on the wiper trip, first rocks to
surface, Geo says B formation.
Page 15117 Report Printed: 1116/2019
Operations Summary (with Timelog Depths)
1 R-23
Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK
Time Log
Start Depth
Stan Time
End Time
Dur (hr)
Phase
Op Code
Ach* Catle
Time P-T-X
Operation
(WB)
End Depth (WB)
10/27/2019
10/27/2019
1.00
PROD1
DRILL
PULD
T
Bump up, PUD BHA# 12
72.0
0.0
19:42
20:42
Bit clean, no clay, all nozzles clear,
one chipped reamer.
10/27/2019
10272019
1.30
PROD1
DRILL
PULD
T
PD BHA#13 D331 clean out
0.0
62.0
20:42
22:00
assembly, sans resistivity and agitator.
Inspect pack off - good
10/27/2019
10/28/2019
2.00
PROD1
DRILL
TRIP
T
Bump up, set counters, RIH
62.0
10,645.0
22:00
00:00
10/28/2019
10/28/2019
0.10
PROD1
DRILL
TRIP
T
Bump up, set counters, RIH
10,645.0
11,105.0
00:00
00:06
10/28/2019
10/28/2019
0.10
PROM
DRILL
DLOG
T
Tie into the K1 for +11' correction.
11,105.0
11,126.0
00:06
00:12
10/28/2019
10/282019
0.30
PROM
DRILL
TRIP
T
Close EDC, continue in hole.
11,126.0
11,672.0
00:12
00:30
Call from Geo / MWD- mistake on tie
in, Pick up.
add additional +10 feet to depth
10/28/2019
10/28/2019
0.70
PROD1
DRILL
WASH
T
RIH pumping 1.86 bpm FS 453 psi,
11,126.0
11,688.0
00:30
01:12
Start taking weight 11,684'siight moto
work, sharp increase in WOB ( 1.1k)
@ 11,687.5 WOB climbed to 4.5k tool
face torqued up. Down on the pump
PU 40 k lbs, clean.
RBIH @ 1.8 bpm @ 1ft/min, same
results PU Wt 37k.
RBIH, creep forward from 11,687'.
WOB dinned to 2.8 k lbs, park, WOB
increased to 4 k stalled.
10/282019
10/28/2019
0.70
PROD1
DRILL
TRIP
T
PUH while consulting wtown.
11,688.0
11,688.0
01:12
01:54
10/282019
10/282019
0.60
PROM
DRILL
WASH
T
RIH 5 times unsucessfully
11,688.0
11,711.0
01:54
02:30
0.5 bpm - 25 ft/min
0.5 bpm - 30 ft/min
0.35 bpm - 18 ft/min
1.2 bpm - 15 ft/min
1.4 bpm - 30 ft/min
RIH to 11,687.2' at 1.90 bpm, just shy
of obstruction, PUH washing @ 1.90
bpm to 11,660'
RIH pumps off, - pass window cleanly.
Start seeing WOB @ 11,711' PUH
10/28/2019
10282019
0.40
PROD1
DRILL
WASH
T
Attempt to pull into casing, stuck and
11,711.0
11,624.0
02:30
02:54
packed off @ 11,624'
Work pipe, regain circulation, pull free
1028/2019
102812019
0.20
PROD1
DRILL
WASH
T
RBIH pumping 1.8 SID at 11,188'. PU
11,624.0
11,711.0
02:54
03:06
cut pump pas through window clean-
Ramp pump rate to 1.8 and RIH to
11,711-
10/2812019
1012812019
1.10
PROD1
DRILL
WASH
T
Attempt to PUH. Packed off and
11,711.0
11,650.0
03:06
04:12
became stuck. getting 1.2 bpm
I
returns for 1.80 bpm in.
Worked pipe from 11,701-11,699
Ct Wt to 46 k, WOB to -5 k, returns
increased, worked pipe, domped
choke, no luck, returns diiminished.
Consult with town, HOT rotating freely,
returns stedy at 1.6 bpm
Work pipe to 80 k three times.
Returns regained as pipe started to
move on third try.
Pulled free.
10/28/2019
1012812019
2.80
PROD1
DRILL
TRIP
T
PUH chasing sweeps on swab wiper.
11,650.0
78.0
04:12
07:00
1
1.5 bbl cutting returned on swab wiper
10/28/2019
10128/2019
1.00
PROD1
DRILL
HULL)
T
PUD BHA #13, blow-down & LD tools
78.0
0.0
07:00
08:00
I
I
Page 16117
ReportPrinted: 1116/2019
Uperations Summary (with Timelog Depths)
1 R-23
Rig:
NABORS CDR3-AC
Job: DRILLING
SIDETRACK
Time Log
Start DePlh
Staft Time
End TMe
Dur (hr)
Phase
Op Code
Activity
Code
Tama P -T -x
Opemon
(ftKS)
End DepM(ftKB)
10/28/2019
10/28/2019
2.70
PROM
DRILL
WAIT
T
Await plan forward, pumping managed
0.0
0.0
08:00
10:42
pressure, blow down both chokes &
micro -motion, work frozen rain on
walking paths around rig, perform
quarterly of pipe handler on skate,
clear & clean rig floor
Decsion made to RDMO, PJSM,
discuss plan forward/scope change,
begin executing plan forward
10/28/2019
10/28/2019
0.90
PROD1
DRILL
PULD
T
PD BHA#14 Nozzle
0.0
53.0
10:42
11:36
10/28/2019
10/28/2019
2.10
DEMOB
WHDBOP
TRIP
P
RIH w/ BHA #14
70.0
11,100.0
11:36
13:42
10/28/2019
10/28/2019
0.20
DEMOB
WHDBOP
DLOG
P
Log K1 for+15', close EDC
11,126.0
11,126.0
13:42
13:54
10/28/2019
10/2812019
2.00
DEMOB
WHDBOP
CIRC
P
Continue RIH, PUW = 37K, pump
11,126.0
11,680.0
13:54
15:54
multiple 5x5 sweeps, jog 7", continue
to circulate in 7", awaiting seawater to
dg
10/28/2019
10/28/2019
2.10
DEMOB
WHDBOP
CIRC
P
Displace well to seawater
11,680.0
2,500.0
15:54
18:00
10/28/2019
10/28/2019
1.80
DEMOB
WHDBOP
FRZP
P
Diesel freeze -protect from 2500'to
2,500.0
53.0
18:00
19:48
surface
10/28/2019
10/28/2019
1.20
DEMOB
WHDBOP
PULD
P
PUD BHA#14
53.0
0.0
19:48
21:00
10/28/2019
10/2812019
1.50
DEMOB
WHDBOP
CIRC
P
MU nozzle, jet stack, pop off, break off
0.0
0.0
21:00
22:30
nozzle, blow down surface lines, vac
stack, bore -0 -scope
10/28/2019
10/29/2019
1.50
DEMOB
WHDBOP
CIRC
P
Work rig down check list.
0.0
0.0
22:30
00:00
1
1
***Rig release at midnightl0-29-2019
0:00
Page 17117
ReportPrinted:
11 /612 01 9
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1R-23L1PBI
50.029-22200-70
Baker Hughes INTEQ
Definitive Survey Report
20 November, 2019
Baker Hughes
ConocoPhillips I
—,ka "5s
CpnOCOPhIlllPS
Definitive Survey Report
COmlwny. ConocoPhillips Alaska lnc Kuparuk
Local Co-orUiru4 Resonance: WeII iR-23
Project: Kopeck River Unit
WD Reverence: 1R-23®88.00usft(1 R-23)
SIN_ Kupamk 1 Pad
MD Reimenpe: IR-23(ID 88.00usft(1 R-23)
Well 1R43
North Reference'. Tete
Wellbore: 1R-23LI PBI
Survey Calculation Method'. Mlnmvm curvature
DesiOn: 1R-23LI PB1
Database: EDT 14 Alaska Pmduction
Projetl Kupamk River
Unit, Nunn Shuns Alaska. United States
Map System: US Stab Fore
1927 (Exact solution) Sysbm Datum: Mean Sea Level
Geo Datum: NAD 1927 NADCON CONUS)
Using Wall Reference Point
Map Zone'. Naska Zane 04
Using Wodeac scale hector
Well 1R43
000 us"
Northing: 5,991,6W.19usft Lalftuee:
]0.23'1]076N
Wall Poison. +NIS
0,00
Easting: 539.829.67uaft Lon9huds:
14V 40'33,721W
+EI.W
Position Uncertainty
use
0.00 use
Welmed Elevation: usft Ground Level:
000 Use
-
Millions 1R-23LI PBI
Magnegcs Model Name
Sampo Dew
Decimation Dip Angle
Field SbangM
(°) (•)
1.11
BGGM2018
11/1/2019
16.39 8088
57403
Design IR-23LI PBI
Audit Names:
Vantin: 10
Phase. ACTUAL
Te On Dentin: 11,6W.W
Without Saplion:
Depth From lND)
+WS 4 411
olrecdon
(uafl)
(WR) Wdl)
(°)
8500
000 DW
20,00
Suety Progwm
Date
Survey
Sury ey
From To
(.0) (..it)Survey
Williams)
Tool Name Description
Bwrt Dela
End Dab
10000 11.600.W
IR -23(I R-23)
GCT -MS 6chlumbergerGCTmulashol
1182001
11682.W 1177024
1R-23LIPBI MWO-INC(1R-23L1PBI)
MW INCONLY (INC>10°) Ml INCONLVFiLLER( INC11W)
10117Y1019
102012019
11.800.20 14.045.15
1R-23L1PB1 MM(iR-23LIPB1)
MWD OWSG OWGG MWD -Stencil
102012019
101222019
Page 2
COMPASS SOW 14 Said 85M
1002019 1:35: 18PM
C0noc0Phillips
ConocoPhillips
Definitive Survey Report
.4M."�91aaa
Company
CoowPhgos Alaska Inc_KupamM
Local Conminam Reference:
Well IR-23
P".d:
Site:
Kupmok Ricer Une
Kupmuk 1 Pad
WG Refinam.
MD Rdarence:
1R-23@W.00ueft(1R-43)
IR-23@88,00usft(1R-23)
Well:
11R33
North Reference:
True
WOW.:
IR-230PB1
Surrey Calculation kmthod:
Minimum
Curvature
Design:
1R-23Li PBI
Demos...
EDT 14 Alaska Pmdudi0n
Survey
MD
hart)
Inc
fl
Axl
PI
Wo
(uaftl
Wow
)rift)
.1114oUM
(deft)
(uaft)
Map
Nor111ing
pq
Map
EWing
MI
DLS
('1100•)
Sect) n Survey Taal Name
Iftl
AnnOtatiOn
11,600.00
61.91
4528
BRI 08
6e.a
5,511.92
6088.29
5.997.110.07
546,687 8a
000
7,52860 MW0-INCONLY(INCat11121
TIP
1168200
8160
44%
37MI65
0,612.65
5.56291
8,919.48
5,997329.33
54671.M
0.
7594.03 MND-INC ONLY(IN01P) (2)
KOP
• 11 710,6g
6780
4563
677300
6.68500
5,561]4
6937.68
5997.24186
..7VW
2858
?611.65 MW INC ONLY21
mtepolated Apmaim
1114014
8118
45.50
6780.87
8692.01
51)0115
8,957.68
5981,28777
so 758.94
46,39
7.64310 MWDJNC ONLY IIN6f0•)(21
Intop0181ed Aeimum
11,77024
9080
4800
6.702.97
6594.87
5622.08
697837
6997288.81
54677031
3297
7,67011 MWT INC ONLY(INC>10•)(2)
Int0p0laled Avm6m
11.600.20
9147
4797
8.782.37
689437
5.84251
1,00127
5,997.3..36
548.86010
6.
?898.80 MWtI OWSG IT
11,03021
90.46
4950
6.78187
6,03.
5,86230
?023IU
5.997.329(26
540.822.55
611
1.7M 11 MNG O.60131
11.88575
88%
5163
6782.32
8...V
568467
705127
5987.35197
.6849.07
8.94
7.75371 MWD OWSG(31
If BP4.75
.0.
54.33
6,782.93
6.694.83
5303 53
7,076.01
5,88737077
506.07451
1001
7.779.70 MWD OWSG (3)
11.925.39
9123
.73
6,78271
669471
571974
7,00962
5,9973117 10
540.09803
1007
7,03301 MWD OW5G (31
11055.99
9040
.5872
8,782.26
8.094.28
5.735.85
1,12562
g.07,403 35
.6.03.95
16..
7.827,04 ~OWSG I3)
11,997.46
.1.70
62.97
618114
e.l',
5.750,45
7,15234
5.997,410.0
546950.50
1550
7849.90 MND eWSG(3)
1201575
91 I6
As.
677972
869172
5.76380
7,17843
5,997.43145
540,97659
8,89
7,871 25 MWO OWSG (3)
1204995
tl696
8320
817948
669149
517908
7...Is
599744102
.7007.04
6.25
7,890.17 MWD OWSG (3)
1200037
9003
6735
a 779 76
6.08110
5,78181
1,23659
5897459.89
547,97459
14.09
1,91758 MW9OWSG (31
12,111.10
0951
0.85
6,77988
6691.89
5.80327
7,265.
5.997A71 60
S17.063M
5.17
7,938.10 MWO 0WS3(3)
12.14028
0714
69.75
6780J4
A.1'1
581358
728237
5,.7'.81.95
.709026
80
705712 MM MSG (3)
12.170.
0590
68.
8182,55
3,694 55
582125
7,32054
5997.492.77
547.11831
5.05
7.97678 MNO OWSG (3)
12.200.05
86.90
6569
8,764.39
68.39
5,63544
734767
5997.50411
.7 14561
764
7..6.& MWD OWSGM
12,23019
BBW
.48
6me2a
669729
564765
7.37541
5,11. 510
.7.173.11
10..
6017.54 MWD OWSGI3)
12,25007
88.05
0.40
6185.63
66970
5.080.55
7,40238
5,9.,52950
5219999
7.25
6.036.87 MWD OWBG (3)
12.29811
8780
6174
870.51
..,98 51
5,87438
142901
S9I.47
50,7$058
7.31
8.godo .97909786(3)
12,32071
..46
6041
6.787.02
6699.02
5,889.11
7,45578
599],558.41
5225325
1031
0.004.04 MNO OWSG (31
12,35094
9043
5728
670.18
6,69619
5,.4.01
140165
5,89757419
.7279.03
1042
8.107.59 MWD ON5G(3)
12,379.52
9020
54.54
670.81
8.68881
5,920.
1,505.31
5.997 590
M7 ..81
9,53
8130.73 MWD OWSG 13)
12,409 45
0.7
5134
61..35
8.89835
5.938.87
7,52819
5.991,one .48
.?326.39
1079
8,15585 Mr4D OWSG (3)
1243852
3043
095
8788.05
66.97
5.950.14
7,55227
5..7.877.0
547,34936
8.00
8.181.85 MbD WSG(3)
12.46815
.75
4708
678601
6,69001
5,97796
7,57430
8,997.04782
M7.37128
671
0,208.0 MM OWSG (3)
1249945
8958
o72
67M 45
6.8.a.
599668
?58642
59870683
647 393
4.10
5.,ao Ga MWD 09760(31
12.52985
0733
4431
6787.
6699.54
6019.
7.617..
5997689.88
.741470
6.95
6262.26 MWD OWSG(3)
17/201019 1:35: )BPM
Pegg 3
COMPASS 5000.14 Build 85H
Survey
MD
(usn)
ConocoPhillips
AN
(1)
.:
ConocoPhillip5
Definitive Survey Report
-NI-S
(use)
Company: ConomPtlllllps Alaska Inc_Kupemk
Local CO -ordinate Referi
WallL1 R-23
Plppm: Kupaluk Riv Unit
WD Reference:
IR-23®B8g0uffi(I R-23)
Slle: Kupamk I Pad
MD Reference
1R-23®88.00lufl11 R-23)
Well: 1R-23
Nonh Refamnce.
True
WellboR: IR-231-11PB1
Survey Calculatlon Method:
MIOInAm Cunalum
Oasign: 1R-231-1PR1
DabEase'
EDT 14 Alaska Pm6udlOn
Survey
MD
(usn)
Inc
(9
AN
(1)
WD
(cell)
TVDSS
(u:el
-NI-S
(use)
V -W
(Man)
Map
Npnhing
MI
Map
Eaming
mt
DLS
I°flop')
wilt l
SedlOn Survey Tool Name Annotation
un
12.55921
883]
4159
578065
6,700 65
6041.42
7630.07
5,997,711.61
54],43421
9.05
828846 MAC OWBG (3)
12.589.80
8802
3801
6,789.01
870191
5,06"81
?65]62
5,99]73490
542.454.16
An
83170 WVD OWBG(3)
1201966
a803
3731
8791.25
6.70325
808826
7,67618
5.937,76864
547.472.56
830
034850 MAID OWSG (31
12,84927
08.88
3489
9.M.C4
8704.04
611220
].693.56
5997782.68
547489.03
931
8.37495 MND OWBG(3)
12,68041
W, 8.
3213
679210
6,704.10
6,130.19
7,71072
5,997.890.76
A7GAS W
1043
040523 MWD ONSG(3)
@.71062
BO.03
20.46
6,79165
6,703a
01.13
7]2619
5,9W.02A 70
50,52216
877
0434.80 .0W8G 13)
1274009
9025
26.39
879136
5.70336
5,193,07
7,710.37
5,897,88169
UTWO Z
10.39
8480.80 MND 0WBG(3)
12.1076
0939
2440
6.79140
070346
6.21705
7.753la
5,90700564
UTUB.06
726
8,49461 MVA OWBG(31
12.80563
90.37
W4.
679153
8203.53
635008
1,76648
599]820.0
547,56199
1184
8.5280 MND OWBG(3)
12.83071
91.14
1027
5291.20
870320
627374
7,77479
5987,844.63
5257010
9.25
8554.52 MWD OAGG(31
12;86005
8231
1544
6,790.20
6)02.20
dam Id,
770353
599792350
547,57876
10.17
058460 MM OW6G (3)
1200.0
9501
1313
al. 4
870034
833185
779094
5988002.62
52588.02
11 GO
851445 MND OWBO(3)
12,915Y
97.39
fill
6.568
569788
836554
7,79821
5,998028.53
50.59115
1134
0,808.71 MND OWSG(3)
1294061
90.64
1000
6782.19
6894.19
637992
780688
5998.050.94
547695/0
840
and 22 MWD 0WSG(3)
1297081
9000
071
6,7164
8.699.E4
540.25
?805.19
5PW,OdO.M
547,59985
1005
8.692.26 MWD OWBG P)
13,00101
4882
370
577290
580198
Ann
7,80791
5998.11021
50,602.41
970
012130 MND CABG(3)
13 ON
9870
142
6.M 49
668046
6,40836
780922
5.90013941
547,60356
79
574918 MVA CMG (31
13,06075
99.54
3.57
6763.0
6,67569
649112
7,01052
5998169.11
5260470
757
01759 MWD MSG (3)
13090.72
9972
508
575614
6NOW
8527.56
181295
5990190.63
528040
7.62
8.008.09 MWD ON5G(3)
13,12046
99.M
783
6,76383
566583
6.656.69
7,01845
5,998.22770
WAI0,32
6.06
083463 MND 0NS3(3)
13,15156
9842
1002
6,74011
866111
6.58706
7.821.22
5'.996,258.16
52614.93
724
0,084.82 MVA OMG(3)
1318049
9756
11 B3
9.74509
6,65709
A.15.10
7.82860
5.998.285.31
52,62024
in
8,893.12 MND 0W60(3)
13,21117
a556
1396
6.74132
689.32
88485
1,833.50
5998,316.
.7 NO
1M
0.9'23.33 MND 0056 (3)
13,24077
9542
15 a5
6.738.23
6650]1
6,073M
7841 ..7
5,999.3449
.7 WAV
146
0,95265 MWD OWSG (3)
1327065
8418
1015
0]35.73
6.64773
6.70177
704970
5PW,373.01
52.842,87
8%
8.882.39 MWD OWSG (3)
13,301.73
"In
2022
BA346
6,64546
6,73180
7,85995
5,0840234
547,652.90
864
901330 MND OWBG(3)
1333111
94.30
23.49
0,731.25
664335
675879
787109
5,998.43014
.7ON.88
1089
9,04326 MWD ON5G(31
13,36L50
8393
2540
6729.10
804110
8780.13
1882.95
5998.45754
52,67559
1.21
8.0730 MWD OWSG(3)
13.39160
92.24
2153
6.72749
5639.49
8,013.82
7,0440
599548529
"TAW .
839
9,102.94 MWD OW5G(3)
1342163
9037
2052
6,725.80
653680
6.64184
7,965.11
5990513.31
"7697.51
iW
9,13286 MND OWBG(3)
1344951
9104
1905.
8726.45
5630.46
6,86807
1.91461
5.08.539."
"?70601
579
9.160.83 MAD OWSG (3)
17202019 195 18PM 114964 COMPASS 5000.14 B.,W 85H
Survey
ConocoPhillips
r
CpppC0Ph1llIP5
Definitive Survey Report
Co.,.,: ConoccPh1111pa Alaska lnc Kupamk
Local Co-ordinate Reference:
1A9111R-23
Project: Kupamk River Unit
ND Reference:
IR-23@8800uct OR -231
Sge: Kupamk I Pao
MD Reference:
1R-23 Q 88.00uafl(1 R-23)
Mil: 11143
Nodb Reference:
Too
Wellbore: 1R-23L1PB1
Survey Calculation Matson:
Minimumcto.ourc
Design: IR-23LIP51
Cabbex:
EDT 14 ANaka Pmdudion
Survey
11,201019 135, IBPM
Page 5
SoketHa9ke.8
Annotation
COMRISS 500014 good 9:77/
Map
Map
VaNcal
MO
Inc
Atd
NO
WEISS
NI -S
4EI-W
Northing
Eaegng
DLS
Section gp4v6y T.1 Name
(.ft)
(1)
(1)
(-aft)
luaftl
luaftl
luaftl
IRI
(ft)
Now)
MI
13,401.
NO
1824
6,]26.03
8638.03
6,69832
7,925.12
+,9905&9.9
SoT111.16
161
9.192.80 MW➢OW6G 13)
1351183
.58
19.28
&225.75
6,63/75
8926.68
?93523
5946.596.55
M7 727
Ia
9.223.14 MWD OWSG Di
13.54166
fiB 45
ta66
6,22524
563224
8.6496
7.945.35
5.99&BM.x
.7737.09
380
9252.9 MWD ON5G (3)
13,52174
68.02
2020.
&325.93
6,637.
6.983.20
Tomto
5,98865492
547742.24
163
928305 MWD OWSGI31
1360120
9c0
1997.
8.225.9
13.6379
7,01141
1.86.5..7
5996 Wo 24
54p5240
092
931308 MWD OW5G 131
13,63349
x49
on a
622564
6,632.85
20411'.
7,9229
5998,112.99
547.260.36
s
9,N4.80 MK90WBG(3)
13661.50
90.58
2105
e,M5.58
6.637.56
7.7.
2,982.16
5,891.25
542.778 31
a
931188 Qua) 0WSG(3)
13.180
x.40
2095
6225.32
8,63732
7.09530
2.99&00
599.26789
.7,2690fi
900
9.40328 MND OMG(3)
13.21613
x.64
2168
6725.10
6.63710
2.11820
&006.85
5.9x.79.23
.7]W 11
318
9,42242 MWD OWBG0)
13.74573
89.85
2216
&324.98
6,839..
7.14566
gotten
59x.8925
Wage 62
3.12
9,45263 MWD 0WSG(3)
13,22560
9609
22.04
6,7249
6639..
711324
6.@936
5998,64539
547.01992
273
940684 MWD OWSG(3)
13,0M.48
9015
2263
6.2N 93
663683
220171
8.. 132
5,996073.92
513.83173
102
9,51769 MAD 0W6G(3)
13.830.4.
9312
229
6,22463
6636.82
2,22385
8050.54
SB90,Bx.10
547,.0.01
6.13
9.541.84 MVA OW6G(3)
13x082
0981
2289
6,224.
6,036.06
7,251W
6,x221
599.923.93
.7,852.
1.11
9.57177 MWD OWSG(31
13095.84
Won
2321
6,224.86
now
7,26400
895.64
5.9x.956.38
.7x561
201
9.801125 MWD OWSG(3)
13,93556
W03
2188
0,32482
town
7.320.99
0,90..
5.998,993 45
542,8x.42
0.
9,04565 MWD 0956 (31
13960.52
6985
21.56
6224.85
8636..
2.39.11
6099.
5,99961&88
547,x955
176
967159 MWD OWSG (3)
Is .85
6900
2154
6724.91
6636.91
3.x742
6109.
5,899x993
542.8a861
914
9698.59 MWD OW3G I3)
14,01552
man
2157
6,7251M
8,63704
2.395"
8,120.11
5,999,082.93
54790046
094
9726.52 MN90WBG (3)
14,04515
09.57
20M
632526
563726
7423.00
&13069
5,99.x5.
542.91992
429
9.766.20 MMOMG(3)
14,088.
8957
2030
8225.56
663258
7463.19
6.145.58
5.99.135.9
:M793457
0.
8,298.. PROJECTED to TO
11,201019 135, IBPM
Page 5
SoketHa9ke.8
Annotation
COMRISS 500014 good 9:77/
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1R-23L1PB2
50-029-22200-71
Baker Hughes INTEQ
Definitive Survey Report
20 November. 2019
Baker Hughes a$
ConocoPhillips
kokuw kns
v
1
ConocoPhIlllps
Definitive Survey Report
Company:
Conowlshillips Alaska lnc_Kuparuk
Local Caamhmute References: W41I tR-23
Project:
Kupamk River Und
TVD Redeemer: 1R-234D88.00usfl(I R-23)
SBa:
Kumek 1R Pao
MO Reference: 1R-23(@ 88.00usfl(1 R-23)
Wen:
1R-23
North Reference: Tree
Wellbore:
1R-2311 PB2
Survey Calculation Method: Mmimumcurvature
Design:
1R-23L1PB2
Database: EDT 14 Alaska Production
Project
Kupamk River
Unit North Slope Alaska, Uneed States
Map Strauss:
US Sete Plane
1927 (Exact solu6an)
System Datum: Mean Sea Level
Geo Datum:
NAD 197 (NADCON CONUS)
Usmg Wkll Reference Paint
Map Zone:
Alaska Zone
Using geodetic scale fade
MH
IR23
Well Position
.NIS
000 usfl
Nanning: 5.991,630.19us8 LatBude:
70'23'17.076N
.V -W
0.00 ren
Easting: 539.82967usfl Longitude:
148°40'33721W
Position Uncertainty
0.00 usfl
Wellhead Elevation'. usfl Ground Level:
0.00 usfl
MMlboe
1R-231-1PB2
Mpllee..
Model Name
Semple Dab
Daclinanon DlpMple
Field Sharl9M
(9 (1)
Inn
BGGM2018
11,112019
16.37 8088
57403
Design
IR-231-1PB2
Audit Notes:
Version:
1.0
Phaae: ACTUAL
Th, On Depth: 12.17045
%mcal SeMan:
Depth Fem(TVD)
.WS . -w
Direction
(all
(mull IaeR)
fl
IS DO
000 000
15.00
Survey Program
Dab
Fran
Th
Survey
Survey
(--ft)
(malt)
Survey(Wa06oe)
Tool Na.. Description
Stan Data
End DO.
10060
11.600.00
1R-23 (IR -23)
GCT -MS SChiuml:efgelGCTiehflland
1182001
11482.00
11,77024
1R-2311 PB 1 MWD4NC(I R-2311PB1)
MW INC _ONLY (INCNO-) MWD-INCONLYFILLER (IN010-)
10)1712019
10(202019
11.800.20
12.17046
IR-23LIP81 MM(1R-23L1PBi)
MWD OWSG OVSG MND -Statement
102012019
102212019
12,190.00
12.984.88
1R-2311%2 MVA I1R23L1PB2)
MWD OMG OWSG MIND - StandaM
102312019
10242019
11202019 1:36:06PM
Page 2
COMPASS WOO. 14 Build 05H
l
ConocoPhillips
i
y
ConDC0I�N��IPS
Definitive Survey Report
Co.,.,: ConoicPhillps Alaska Inc Kupamk
Local Coaoimle Rafaren4x:
N@0li
Plojed: Kuparuk River Unit
WD Reference:
1R-23@88.00aiOR-231
SBe: Kupamk 1 R Pact
MD Reference:
1R-23 Q 88 O 0R-23)
Well: 1R-23
No.h Reference:
Tore
Wellbore: 1R3XIPB2
Survey Calculation Method:
Minimum Curvature
Deals., 1R$3L1PB2
Databau:
EDT 14 Alwort Production
Survey
llRi lg 13606PM
Annotation
TIP
KOP
COMPASS 5000.14 El 8514
G
Map
Map
Vertical
MD
I Il
Atl
WD
%088
4Ni
�_W
No(11)
a+let
OLS
Semon surrey Tool Name
(ti l
11I
1°I
jump
lueel
(-ft)
lural
I-mm,I
IN
120048
.90
6076
6]02.55
66&.55
55.26
?320.54
5 7.49L77
541,11837
5.05
7,52049 MWJO .0 (3)
12190.00
.6.
6739
..no 2
6895.02
533153
7.33863
59W,5N.15
54.1.42
166
753220 MWD OWSG 141
12222.12
...
89.10
678 a
56%.80
534388
7.68.
5997.5120
547.1.06
9.63
Tor St MWD OWSG 14)
1225142
91 fib
8625
6784.56
SAW.
5,655D5
?39x.34
5997,523.91
547193.00
945
7.569 E0 MWD OWSG 14)
12280.02
9270
Sir Is
8,78344
6.69544
rlor?M
7422.01
59978%42
547,219 fA
?84
?598.40 MWD OMG 14)
12,311.05
9111
60.81
0.70249
6.69442
580130
1440.82
5981.550.50
54,246.33
1200
7.009all MWD OWSG HI
1234057
918]
.2a
678164
raw.
50%.25
7,4425
5997565.59
54727188
925
1,62982 MWD OWBG(41
12,370.51
9184
Si
6780.07
668287
5,91259
7.499.32
5.997,682.
"729865
as,
7,65209 MWD OWBG (4)
12.400.76
9114
W63
677980
669180
P.M 33
752381
59%59992
M7,32106
9.96
7,67655 MYA OWSG 141
12.43011
9132
.73
0)79.24
669124
5,948 t3
7.51718
5,991.81885
547,344,32
960
7.88977 MM Oli(in
12.46038
0.47
4777
6.718.
689000
5.9064
7.56942
5511783047
"7,36645
9.82
7724.37 MM GMG(4)
12,49040
W7.
4391
6,77638
8,881
598951
7,590.92
5.91465946
517,20704
13.04
7750.10 MWD OW5G I4)
1252088
9318
4041
8774.62
8,693.82
601201
7,61129
5,997602.%
.7401
11.95
1777.10 MWD OWSG 14)
1255040
9359
4105
6,77272
58".72
8,034.39
7.30W
5997104..
547427N
2.
7.80371 MWD OWSG(4)
12500.01
9344
4427
677085
6,882.05
6056.71
165113
599786.97
M744.W
1059
7.0059 MWD OWSO(4)
12805.89
8209
mul
6769.64
688184
5014.30
186902
5,9977.73
Wilds 48
10.17
7.35229 MWD OWSG 01
120.05
92.0
49.13
8.168.34
6fi00.
SAW as
1.126
5997765.02
"7487.61
027
187753 MWD OWSG (4)
12666.19
91."
4653
6,76716
BVol$
6,11436
771393
5,99778497
54,51017
4.81
7W2, 55 MND OWSG 141
128%,27
91 fig
45.b
8700.33
8818.33
6,134.91
7,735.90
5,8%.80581
54753203
10.55
792005 M.0VSG on
12,726 On
9187
4186
6.78541
BBP 41
61%41
71:5.40
5897821.22
.7,55241
11 72
7064.14 MM 0NSG(4)
12,76003
%26
3664
6.1113.89
6675.89
61.51
7.778.37
5,991.85328
"1,57424
1035
7,984.80 MND Ofai(4)
12.79011
.60
38.51
6.762.11
6874.11
62W.16
7.70 as
599!.011.17
M7,592.42
711
601251 MVA 00050 14)
12,818.%
.05
3307
676021
San 21
8$2967
7.8139
5997,90DJ8
54M M
9.33
800963 MND 0003(3 (4)
12851.18
star
3145
6,757.16
...a 70
62.72
7.83088
59979991
517826.07
100
8,070.23 MWD OWSG(4)
1288042
9566
2822
o7won
851701
5201.87
1,845 00
598795323
.7..041
1131
600637 MWD OWSG(4)
1290994
9584
254
8]52.05
8.¢84.05
0,30011
raw.
5,997.91951
Straw."
92a
612712 MND OWSG (4)
12,0561
won
2913
674941
6,85141
6.33144
7,8"85
59860020'3
"7.6392
809
8,15231 MWD OWSG Iq
12964.6
96.30
W52
674627
8,8627
am 0
1.019.67
5986029%
.?61459
0.92
0.10120 MWD OWSG (4)
13010.
W30
.52
6.14132
6653.32
6A..46
16%39
Sol as
"789609
6nn
a,225" PRO3EC1EO10 TD
llRi lg 13606PM
Annotation
TIP
KOP
COMPASS 5000.14 El 8514
G
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1R-23L1PB3
50-029-22200-72
Baker Hughes INTEQ
Definitive Survey Report
20 November, 2019
Baker Hughes
ConocoPhillips
Company: ConocoPulips Alaska Inc_ Kupamk
Project: Kupamk River Unit
Sita: Kupamk 1 R Pao
Well: 1 R-23
Wellbore: 1R-2311 PB3
Daelgn: 1R-23LI PB3
Project Kuparuk River Unit, North Slope Alaska, United States
Map S'Ndi US Slate Plane 1927 (Exact solution) 8yarem land
Geo Daum: NAD 1927 (NADCON CONUS)
Map Zone: Alaska Zone
Well
IR -23
ConocoPhillips
Definitive Survey Report
Local ConNlnefe Foundation:
Wall 1R-23
TVD Reference:
1R-23 @ 88 00ush (1R-23)
MO Reference:
1R-23 Q 58.00usft (1 R.23)
North Reference:
Tore
Survey Calculation Metbad:
Mlmmum Curvature
Database:
EDT 14 Akska Preelection
Welt Position .W.6 000 Left Northing:
.E1W 0.00 unit Esedng'.
Position Uncertainty 000 usM1 Wellhead Elevation:
Wellbore
1R-23L1PB3
Dab
Me9lNtles
Model Name
Sample Oats
(us11)
BOGM2018
11112019
Design
1R -23L1 PB3
1 R-23 (1R-23)
Audit Notes:
11P024
1R-23L1PB1 MM-INC(1R-23L1P81)
Version.
10
Phase: ACI UAL
Vertical Section:
13.72047
Depth From ITVDI
(usft)
88.00
Survey Program
Descriptions
Dab
From
To
MiA INC_ ONLY FILLER(INC>10')
(us11)
(isiI
Surs"(Wellans)
100.00
11.800.00
1 R-23 (1R-23)
11.68200
11P024
1R-23L1PB1 MM-INC(1R-23L1P81)
11.80020
12.111.10
IR-23L1PBI MWD(1R-23L1PB11
12.13000
13.72047
1 R-23L1PS3 (1R-23L1P83)
Mean Sea Level
Descriptions
Using Obll Reference Pent
Schlumberger GCT mullishot
Using geodehc soak factor
MiA INC_ ONLY FILLER(INC>10')
5,99163019usft
Latrade:
539.629.67usft
Longitude:
cash
Ground Level:
DaUiruBon Dip Angle
r) (1)
16,37 8088
Tie On Depth: 12,111.10
-NI-5
(usft)
0.00
.EI -w
(Lstli
0 Co
Tool No.
Descriptions
GCT -MS
Schlumberger GCT mullishot
MWUINC ONLY INC>10-)
MiA INC_ ONLY FILLER(INC>10')
MWD OWSG
OWSG MWD- Standard
MWD OWSG
OWS(3 MIND - Standard
Dlnrnan
V)
15.01)
Survey
Sad"one
1A62001
101172019
10202019
1012512019
m4erwpin5s
70° 23 17076 N
149.40'33721W
000 Lad
Fkald Strength
071
57.403
Sai
End Dab
10202019
10122M19
102812019
11/102019 1:36 52W Page 2 COAl500014 Sudd 85H
Annotation
TIP
KOP
1120,2019 1:36'52PM Pape 3 COMPASS 5000.14 BMM 85H
ConocoPhillips
i
COn0O0Ph1llips
Definitive Survey Report
Company: C...Phillps Alaska In. K,.k
Local Coof6mate Reference:
VM111 R-23
Project: Kuparuk River Una
NO Reference:
IR-23@8800usft It R-23)
Sites Kupamk lR Pad
MD Reference:
1R-23@88OOus0(I R-23)
Wel; 1R-23
North Reference:
Tme
Wellw.: 1R4!3LIPB3
Survey Calc.1.1,.n Me0lod;
M'mimOmculva(ure
Deslpn: 1R -23L1 P83
Dam9ase:
EDT 14 Alaska Pm0.cbOn
Annotation
TIP
KOP
1120,2019 1:36'52PM Pape 3 COMPASS 5000.14 BMM 85H
Map
Map
vertical
MD
Inc
SalND
47056
4975
497-W
Narming
Eastinq
OLS
UadOp Survey Tool Name
luanl
1°1
(1)
(daft)
Idaft)
(Uan)
(deft)
(it)
(ft)
f1loo')
(ft)
12.11110
8951
88.85
6.]7909
BWI B9
500327
1265.09
1..7,171 SO
:.7.304
5.1I
?48587 MWD OWSG (3)
12130.00
8797
6943
878030
.,MMSO
561000
1.28275
5,997,41032
U708065
Bit
7.49694 MWD MSG (4)
1216056
W65
.4.
8]81.
689314
58210
1.31104
5,99148992
547,100.88
10.54
7,515.33 MAD MSG (41
1217.20
.77
6374
5..a0
689595
5.033.89
7331&5
5,99750250
:4]135.62
1122
7.53428 MWD OWBG pI
12221St
W68
62.00
8788.30
0.MW
504197
1,36582
5897,51674
.7.163 52
517
7,555.12 Mo I4)
12,2517
.21
62.44
8789.18
.7018
5.86159
7.39212
5,9753040
547,18974
157
7,575.00 MM MSG (4)
1228032
82.44
.19
6793..
6 705 N
5.01448
741775
5997.54351
547,2157
8.97
?594.16 MVA OWSG (4)
127284
8323
11942
6.79710
&7W.10
5,88116
7.740
5,991.556.31
541,24488
1&14
7,61411 MM MSG (4)
12.34224
.301
W97
6,00.82
6.712.
589602
7,474,50
5.01,561 .38
547271,91
031
1.631% MWD OWBG (4)
12.37156
9074
.31
&72.23
6.71123
5909.18
1.01&5
5.997 578
541,299.00
SO Be
7,64940 MWD MSG (41
124.37
9107
.09
6,7173
6,71373
5,92135
7.6. SO
597.50098
477.327.1
123
103865 MWD OWSG UI
124310
8773
W.20
6.8020
6114.03
5.933.67
7.5583
5,991,803.
50.5385
IS.
788729 MVA OW 14)
124617
WI,,
an
6.003.%
6115.%
5.94771
7.58315
5.997.81762
547,38026
874
770771 MVA MSG HI
12,49128
0157
SO
6,805.16
671716
5,961? 01
160873
5991.2 .0
.7.67.
445
7,728 14 MND MSG (4)
12521.23
6963
5696
680.0
6717.
5,9777
7634.61
5.991.&724
.743159
883
7149.30 MWD MSG (4)
12,55104
91.13
5755
6,7569
6711%
699314
1.66..55
599165346
54745754
6.55
7.77165 MMMSG (41
12500.0
9224
5509
87486
611685
600876
?04.14
SSW07. 20
.?40.94
.P9
7.192.82 MWD MSG (4
1261033
.OS
53.17
5.72 .96
6.114.
80X.46
7,708 62
5,99769143
.7.50.32
In.
7,O1625 MWD ON (4)
12,.8.33
36.38
SO17
6,79948
6711.40
6.04430
1.73244
5.99771499
.7.529.05
1144
7.83965 MM MSG 141
1267.36
10282
.15
6,m..
670,95
6.062 02
Tm615
5997.132..
M7$5261
1476
706288 MND OWSG I41
12700.90
1W.4.
5103
675625
6696.25
&7999
7779.53
59971%.7
.751541
1249
7,886.31 MM MSG (4)
1213.60
107
4966
6,77765
6,65985
609816
7.80177
5,9917..21
.7.598.06
7.10
],90961 MWOMSG (41
1276114
108,83
0.59
6168.85
6,00 SS
6.11729
7,823.49
59971.46
.7AI. 70
8.%
?93352 MND MSG (4)
1279133
.a So
45.84
810.45
667245
&17.1.
7,.4.52
5.997808.30
.7.0.63
697
7,958.30 MWD MSG 141
1202124
1095
4454
675280
6,1364.80
6.15755
7,885.11
5997826.
547,661 1.
691
7983,38 MWD MSG I41
12.85058
10172
44,07
674628
6658..
6.118,01
1,80607
509184850
50.6907
776
800.31 MM MSG 14)
12,7020
.87
4303
674073
6.65273
6.19911
7,905.13
5997,87071
.1.100.7
713
8033.08 MMMSG (4)
1291105
9788
..
11.7357
6,64197
8,22149
1.925.83
5.997,8019
.752147
665
8,0085 MWD ONSG (4)
12.940.80
031
3989
5..x
16. ad
624370
7,945.21
5.997.915.0
54774050
10.24
8,01.33 MWD MSG (4)
127103
9607
3634
672904
5.54104
628701
7,74.23
5997,930.91
.775963
5.18
8,11416 MND MSG 01
Annotation
TIP
KOP
1120,2019 1:36'52PM Pape 3 COMPASS 5000.14 BMM 85H
ConocoPhillips
ConocoPhillips Definitive Survey Report
Company:
C,ma.Phlllips Alaska lnc Kup...
Local Co- dlnete RaNmnce:
Mil 1R-23
P.ofeGtt
Kupamk Rive. Unil
TVD Retools.
iR-23@8B00ua8(I
R-23)
Site:
Kupamk I Pad
MD Reference:
iR-23 Q
8B.00usg(I
R-23)
Well:
IR -23
Nonh Refinance:
Tme
Wellbore:
1R231-1 PB3
Survey Calculation Method
Minimum
Curvature
Design:
IR-23LI P93
Datum.
EDT 14 Aunka P.ducbon
Survey
Map
Map
Venlcal
MD
Inc
Aai
NO
TUDSS
aN.S
iV-W
Northhlg
EMU,
DNS
Semon Survey Tool Name Annotation
Juan)
PI
11)
(.aft)
(usn)
(uan)
(Mart)
(Itl
IN)
(^nw)
IRI
13.00094
Will
3535
6,725.87
6.63787
6.290.81
190207
5,992962.01
5277739
9.
8.142.37 MWO OMG (4)
13,03103
89.13
3372
6,722.66
6634.
631540
?999.03
5997,98754
547794 16
539
8.170% MWOOWSG(4)
136609a
9597
3095
071951
0,031.51
6,34059
601493
5,998,01275
U7 Mo 94
923
6.19895 MNA OWSG(4)
13.091 D2
8569
2835
8,716.45
662645
636654
802979
5.898J138.83
A282980
065
8.227.80 MVA OWSG 14)
13.12099
9569
2571
0.71349
6,825.49
6,393.11
8.043.27
5.89806542
U7837.98
S 7
0247. MVA OW6G 0)
13,150.5.
9523
23.25
6.71086
6.622.
0419.
805548
5,990,09233
Wile)W
841
8,28612 MVA OWBG(a)
13,10061
.88
211.
6.70 .02
662002
644755
8.99679
5,99812000
52.122
702
3.315.79 MWD OWSO(4)
13210.'a
9406
1820
6,705.
6.617.
8.47585
8.076.92
598814843
54737118
10.17
8,34575 MWDOWSG(4)
13,24067
94 a3
150
8703 a5
661545
6.5.45
8,08570
5.090.17698
54787982
131
8,37555 MWD OMG 44)
13,27076
93.75
1511
8701.30
6.813.30
6533.37
009375
5.90.20
547.88772
3.82
8,405.56 MVA OWSG I4)
13,300.
9160
1209
8,699.91
6.611.91
556239
8.10073
5.99823999
52894.58
12.39
8.43542 MVA OMG HI
13.33078
8975
9.85
6,69x.55
0,61155
65919a
61.50
5998.204.
547.50015
965
8485 44 MNOOWSG 14)
13,360,70
06.16
106
5703.10
6612.10
662158
811107
5990294.22
52994.51
097
0.49525 MWD OMG (41
13,30 .70
8810
Sa3
0,70108
8,613.06
665138
811450
5988324.04
52&17.33
749
052493 MWD OWSG(4)
1342100
.900
220
6,701&
6.61384
0,08152
611551
5,998354 .19
547939 fib
1199
0654.56 MWD OWSG(4)
1345563
0970
016
6702.21
051421
5,116.14
6,11122
Sawmill 81
.7 910.21
631
0WB 19 MWD OW5G(9)
13.48061
89.11
359.23
570245
6.61445
674112
0,11709
5998413 T.
517,909.94
459
661229 MND OMG 14)
13.51065
0.37
3..23
070.12
6,61512
577114
611643
5.998,443 .80
Sal 909.13
9.01
864111 MWD OWSG(4)
13540.60
0579
357,06
S7. Ill
Al..
08m03
0.11522
5998.2361
541.90776
953
B.W9. MJVD OMG (4)
13, Sm 70
8332
1...
8107.
6,619.50
Gam VS
0,113.85
5880,503.50
52386.03
822
009816 MWD OWSG(41
".Ob
8150
35590
671140
6,62340
Sam l
6.11191
590.532.93
547Mi404
6.81
8726.04 MWD OMG (4)
13,530.68
.108
35227
6115,97
6,five7
8090.10
SAN 73
59.56210
5290079
11.99
8754.02 MWD OWSG(4)
13,0302
99.81
3.50
6,720.65
6,632.65
6,919.19
8.104.34
5.08,59177
547,896 25
5.68
8,73098 MNO OW5G (4)
13.69047
.el
351.85
6.725.99
6,637.
094045
8,09982
5.99882100
52,9919
4.23
0,80007 MWO OvB (4)
1372047
82.26
353.
6.729.97
664197
6.87737
80805
59966.40
541..1.
7.63
6835.52 MND OWSG(4)
137._.
82.26
35354
8735.29
884729
7.01578
9,0169
599068929
52683.03
0.
0,87197 PROJECTED to TO
11OOROIP 13552PM
Page 4
mk..RaSig
COMPASS 5"..14 BWM 85H
6
RECEIVED
NOV 2 2 2019
AOGCC
Baker Hughes
Date:
November 20, 2019
2 19 128
31483
Letter of Transmittal
To: From:
Abby Bell Harvey Finch
AOGCC Baker Hughes
333 West 7" Ave, Suite 100 795 East 94" Avenue
Anchorage, Alaska 99501 Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
1R-23L1PB1
1R-23L1PB2
1R-23L1PB3
1F -07L1
iF-071.1-01
(5) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Harvey Finch, Baker Hughes, Wellplanner
Harvey.Finch@bakerhuBhes.com
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1 R -23L1 PBI
50-029-22200-70
Baker Hughes INTEQ
Definitive Survey Report
20 November, 2019
219128
31483
Baker Hughes t:�
Design: lR-23L1P81
Project Kuparuk River Unit, North Slope Alaska, United States
Map System:
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips Alaska Inc_Kupamk
Local Co-ordinate Reference:
Project: Kuparuk River Unit
TVD Reference:
Site: Kuparuk 1R Pad
MD Reference:
Well: 1R-23
North Reference:
Wellbore: 1R-23L1PB7
Survey Calculation Method:
Northing:
Database:
Design: lR-23L1P81
Project Kuparuk River Unit, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Geo Datum:
NAD 1927 (NADCON CONUS)
Map Zone:
Alaska Zone 04
Well
7R-23
Well Position
•Nl-S 0.00 usft
Northing:
TO
(usft)
11,600.00
11,770.24
14,045.15
.El -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
1R-23LIP31
Magnetics
Model Name
Sample Date
BGGM2018
11/112019
Design 1R-231-1 PB1
Audit Notes:
Version: 1.0 Phase: ACTUAL
Vertical Section: Depth From (TVD)
(usft)
5800
Well 1R-23
1 R-23 (03 88.00usft (1 R-23)
1R-23 @ 88.00usft (1R-23)
True
Minimum Curvature
EDT 14 Alaska Production
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
5,991,630.19usft
539,829.67usft
usft
Declimilion
(%
16 37
Tie On Depth: 11 600.00
+N/ -S
(usft)
0 00
Latitude:
Longitude:
Ground Level:
Dip Angle
0
8088
*E/ -W Direction
(usft) (`)
0.00 2000.
Baler Rughea 5f
70° 23' 17.076 N
149" 40' 33.721 W
0.00 usft
Field Strength
(nT)
57,403
Survey Program
Dab:
Survey
Survey
From
(usft)
100.00
11682.00
n Boo 20
TO
(usft)
11,600.00
11,770.24
14,045.15
Survey (Wellbore)
1R-23 (1 R-23)
1R-23L1P81 MWD-INC(1R-23L1P81)
1R-23L1PB1 MWD (lR-231-1PBl)
Tool Name
GCT -MS
MWD4NC_ONLY(INC>10-)
MWD OWSG
Description
Schlumberger GCT multishol
MWD -INC ONLY FILLER(INC>10")
OWSG MWD - Standard
Date
1/8/2007
10/17/2019
10/20/2019
End Date
10/20/2019
10/22/2019
Page 2 COMPASS 5000.14 Build 85H
11/20/2019 1r35:18PM
Survey
ConocoPhillips
Mkor Hugh. 58
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips Alaska tnc_Kuparuk
Local Co-ordinate Reference:
Well 1R-23
Project: Kuparuk River Unit
TVD Reference:
1 R-23 @ 88.00usft (1 R-23)
Site: Kuparuk 1R Pad
MD Reference:
1R-23 <Q 88.00usft (1 R-23)
Well: 1R-23
North Reference:
True
Wellbore: 1R-231_1 PB1
Survey Calculation Method:
Minimum Curvature
Design: lR-23L1PB1
Database:
EDT 14 Alaska Production
Survey
11202019 1:35: 18PM Page 3 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Azf
TVD
TVDSS
+N/ -S
+E7 -W
Northing
Eastin
DLS
Section
Survey Tool Name
Annotation
(usft)
(°)
(°)
(usft)
(usft)
(uaft)
(waft)
(ft)
(ft)
0100') (`/100')
(ft)
11,600.00
61.91
4526
6,72188
6.633.88
5,511.92
6,86829
5.997 178,07
546.667.83
0.08
7,528.60
MWD-ING_ONLY (ING10°)(2)
TIP
11,682.00
6166
44.95
6,76065
6,67265
5.562.91
6,919.48
5,997,229.33
546,718.74
044
7.594.03
MWD -INC _ONLY (INC>10°)(2)
KOP
11,710.85
67.60
45.00
6,773.0
6,68560
5,561.34
6,937.89
5,997,247.86
54673]86
2059.
7,61765
MWO-INC_ONLY(INC>10°)(2)
Intepolated Azimuth
11740.14
81.18
45.50
6,760.87
6,692.87
5,601.15
6,95788
5,997,26777
546,756.99
46.39
7,643.10
MWD -INC _ONLY (INC>Ifl(2)
Intepolated Azimuth
11,770.24
90.80
46.00
6,7a2.97
6,689.97
5,622.08
6,979.37
5,997288.81
546778.31
32M
7,670.11
MWD-INC_ONLY (INC>1(Y)(2)
Intepolated Azimuth
11,800.20
91.47
47.97
6,782.37
6,694.37
5.642.51
7,001.27
5,997.37.36
546.800.10
6.94
7,696.80
MWD OWSG (3)
11,821021
9046
49.50
6,781.87
6.693.87
5,662.30
7,023.82
5,997,329.26
546,822.55
6.11
7723.11
MWD OWSG (3)
11,865.75
88.10
5163
6,782.32
6,694.32
5,684.87
7,05127
5,997,351.98
546849.87
8.99
7.753.71
MWD OWSG (3)
11696.75
89.63
54.33
6,782.93
6,694.93
5,703.53
7,076.01
5,997,370.77
546,874.51
10.01
7,779.70
MWD OWSG (3)
11,925.39
9123
56.73
6,782.71
6,694.71
5.71974
7099.62
5,997,387.10
546898.03
10.07
7.803.01
MWD OWSG (3)
11,95599
9046
59.72
6,782.26
6.694.26
5,735.85
7.12562
5,997,40335
546.923.95
10.09
7,827.04
MWD OWSG (3)
11,986.46
93.78
62.97
6,781.14
6,693.14
5,750.45
7,152.34
5.997,418.08
546.950.58
15.24
7,849.90
MWD OWSG (3)
t2,01575
91.78
63.24
6,779.72
6,691.72
5,763.68
7,178.43
5997,431.45
546976.59
6.89
7,871.25
MWD OWSG(3)
12,049.95
88.%
63.20
6,779.49
6,69149
5,779.09
7,20895
5,997,44702
547.007.04
8.25
7,896.17
MWD OWSG (3)
12,060.37
90.03
6735
6,77976
6,69176
5,791.81
7,236.58
5,997,459.89
597034.59
14.03
7,91758
MWD OWSG (3)
12,111.10
89.51
68.85
6, T/9.89
6,691.89
5,803.27
7,265.09
5,997,471.50
547,063.04
5.17
7,938.10
MWD OWSG (3)
12,140.28
87.14
69.75
6,780.74
669274
5,81358
7,292.37
5,99748195
547090.26
8.69
7.957.12
MWD OWSG (3)
12,170.46
8598
68.76
6,782.55
6,694.55
5.824.25
7.320.54
5997,49277
597,118.37
505
7,976.78
MWD OWSG (3)
12200.05
86.90
66.69
6784.39
6,696.39
5,835.44
7,397.87
5.997,509.11
54],145.69
764
7,996.64
MWD OWSG (3)
12,230.19
89.66
65M
6,785.29
6,697.29
5,847.65
7,375.41
5,997,516.47
547,173.11
10.00
8.017.54
MWD OWSG (3)
12,26007
8905
63.40
6,785.63
6,697.63
5,860.55
7,402.36
5,997,529.50
547,199.99
725
8,038.87
MWD OWSG (3)
12,290.11
6760
61.74
6,786.51
6,698.51
5,874.38
7,42901
5,997,543.47
547.226.56
7.39
SOW
MWD OWSG (3)
12,320.71
W).
6041
6,787.02
6,699.02
5,889.17
7,455.79
5,997,55841
547.253.25
10.31
8,084.09
MWD OWSG (3)
12,350.94
90.43
5726
6.78679
6,698.79
5,904.81
748165
5,997,574.19
547,27903
1042
8,107.59
MWD OWSG (3)
12,379.52
9028
54.51
6,78661
6.696.61
5,920.84
7,50531
5,997,59033
547,30261
9.53
8,13073
MWD OWSG (3)
12,40945
90.71
51.34
6,786.35
6,698.35
5,938.67
7,529.19
5,997,60849
547,326.39
10.79
8.155.85
MWD OWSG(3)
12,439.52
90.43
48.95
6.786.05
6,698.05
5,958.14
7,552.27
5.997,627 88
547,349.36
8.00
8.18185
MWD OWSG (3)
12,469.15
89.75
47.08
6.78601
6.698.01
5.977%
7,574.30
5,997,64782
547,371.28
6.72
8,208.00
MWD OWSG (3)
12,499.45
88.56
46.72
6,786.45
6,698.46
5,99866
7,596.42
5,997,66863
547,393.29
4.10
8,235.2
MWD OWSG (3)
12,529.65
87.33
44.31
6,78784
6,699.54
6,019.80
7,617.95
5.N7,689 89
547,414.70
6.95
8,26226
MWD OWSG (3)
11202019 1:35: 18PM Page 3 COMPASS 5000.14 Build 85H
ConocoPhillips ama agM1e,g
ConocoPhillips Definitive Survey Report
Company:
ConowPhillips Alaska lnc_Kuparuk
Project:
Kupantk River Unit
Site:
Kuparuk 1R Pad
Well:
1R-23
Wellbore:
1R-23L1PB1
Design:
1R-23L1PB1
Survey
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well 1 R-23
1 R-23 @ 88.00usft (1 R-23)
1 R-23 @ 88.00usft (1 R-23)
True
Minimum Curvature
EDT 14 Alaska Production
Annotation
11/20/2019 1:35: 18PM Page 4 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+Nl-S
+EJ -W
Northing
Easting
DLS
Section Survey Tool Name
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
iftl
(ft)
(°1100)
(ft)
12.55921
88.37
4159
6.78865
6,700.65
6.04142
7,638.07
5,997.711.61
54]434]1
9.85
8,289.46 MWD 0WSG(3)
12.58950
8687
38.81
6.789.91
6.701.91
6.064.61
7.65767
5.997,734.90
547,454.18
10.39
8,31795 MWD OWSG(3)
12,61966
88.03
37.31
6.791.25
6.703.25
6.088.26
7.67618
5.997,75864
547.472.56
6.30
8,346.50 MWD OWSG(3)
12,649.27
8889
34.69
6,792.04
6,704.04
6,112.20
7,693.58
5,99778268
547,489.83
9.31
8,37495 MW OWSG(3)
12,68041
90.89
32.13
6,792.10
6,704.10
6,138.19
7,710.72
5,997,808.76
597,506.83
10.43
8,405.23 MWD OWSG(3)
12,710.62
90.83
29.48
6.79165
6,703.65
6,16413
7,726.19
5,997,834.78
547.522.16
877
8,434.90 MWD OWSG(3)
12,740.89
90.25
26.39
6,791.36
6,703.36
6,190.87
7,740.37
5997,861.59
547.53620
10.39
8.464.88 MWD OWSG(3)
12,770.76
8939
2440
6,79146
6,703.46
621785
7,753.18
5,997.888.64
54],548.86
7.26
8,49461 MWD OWSG(3)
12,W5.63
90.37
20.46
6,791.53
6,703.53
8,250.08
7,765.48
5,997.920.93
54],56199
1164
8,529.M MWD OWSG(3)
12,830.71
91.14
18.27
6,791.20
6,703.20
6,273.74
7,77479
5,997,944.63
547,570.18
9.26
6554.52 MWD OWSG(3)
12,860.85
92.37
1546
6790.28
6,702.28
6,302.56
7]83.53
5.997,973.50
547,57876
10.17
8,584.60 MWD OWSG(3)
12.890.93
9501
13.13
6,788.34
6,700.34
6.331.65
7.790.94
5.998,00262
547,586.02
11.69
8,61446 MWD OWSG(3)
12,915.54
9739
1111
6,78568
6,697.68
6,355.54
7,796.21
5,998,026.53
547,591.15
11.24
8,638.71 MWD OWSG(3)
12,940.61
98.64
10.00
6,782.19
6,694.19
6,379.92
],800.88
5,998,050.94
547,595.70
840
6663.22 MWD OWSG(3)
12,970.61
98.80
671
6,777.64
6,689.64
6,409.25
7,805.19
5,998,080.29
547.59985
10.85
8,692.26 MWD OWSG(3)
13,001.01
98.82
3.70
6,772.98
6,684.98
6,439.16
7,80791
5,999,110.21
547,602.41
9.78
8.72130 MWD OWSG(3)
13,030.58
9870
1.42
6768.48
6,680.48
6.468.35
7,80922
5,998.13941
547,603.56
763
8,749.18 MWD OWSG(3)
13.060.75
99.54
357
6,763.69
6,675.69
6,498.12
7,810.52
5,998,169.17
547,604.70
7.57
8,777.59 MWD OWSG(3)
13,090]2
99.72
5.86
6.75868
6.670.68
6,527.56
7.812.95
5.99619863
547,606.98
7.62
8,806.09 MWD OWSG(3)
13,12046
99.04
783
6.753.83
6.665.83
6,556.69
781645
5.998,22778
547,610.32
6.86
8.834 fib MWD OWSG(3)
13,151,56
98.42
1002
6,749.11
6.661.11
6,58706
7,821.22
5,998,258.16
547,614.93
7.24
8,864.82 MWD OWSG(3)
13,180.49
97.56
11.93
6,745.09
6,657.09
6,615.18
7,826.68
5,998.286.31
547620.24
7.18
8,893.12 MWD OWSG(3)
13,211.17
96.%
13.96
6,741.32
6,653.32
6,644.85
7,833.50
5,998.316.02
547.626.90
7.33
8,923.33 MWD OWSG(3)
13,240.77
9542
15.86
6,738.23
6,650.23
6,673.30
784107
5,998,344.50
547,634.32
7.$6
8,952.65 MWD OWSG(3)
13,27065
94.18
18.15
6,735.73
6,647.73
6,70177
7,649.78
5,998,37301
647,64287
8.69
8.982.39 MWD 0WSG(3)
13,30173
94.18
2022
6,73346
6,645.46
6,731.04
7859.96
5,998,402.34
547.65290
664
9,01338 MWD OWSG(3)
43,33171
94.30
2349
8.73125
6.643.25
6,758.79
7.87109
5,998,430.14
547,663.88
10.88
9,043.26 MWD 0W8G(3)
13,361.59
93.93
23.40
6729.10
6.641.10
6.786.13
788295
5.998,45754
547.675.59
1.27
9,07300 MWD OWSG(3)
13,391,60
9224
2153
6.72749
6.639.49
6,813.82
7,894.40
5,998,485.29
547,686.89
8.39
9,102.94 MWD 0WSG(3)
13,421.63
90.37
2052.
6,72660
6,638.80
684184
7905.17
5,998.513.37
54769751
708
9,132.95 MWO 0WSG(3)
13449.51
91.04
1905
6,726.46
6638.46
5866.07
7,91461
5.998.539.64
54]706.81
579
9,160.83 MWD 0WBG(3)
Annotation
11/20/2019 1:35: 18PM Page 4 COMPASS 5000.14 Build 85H
ConocoPhillips a kKB
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips Alaska Inc_Kuparuk
Local Co-ordinate Reference:
Well 1R-23
Project
Kupamk River Unit
TVD Reference:
1 R-23 @ 88.00usfl (1 R-23)
Site:
Kuparuk 1R Pad
MD Reference:
1 R-23 @ 88.00usfl (1R-23)
Well:
1R-23
North Reference:
True
Wellbore:
1R-23LIP81
Survey Calculation Method:
Minimum Curvature
Design:
1R-23LIPB7
Database:
EDT 14 Alaska Production
Survey
Annotation
11202019 1: 35. 18PM Page 5 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Eating
DLS
Section
Survey Too] Name
(usft)
(°)
(%
(usR)
(usR
(usR)
(usk)
(ft)
()
(ft)
(°/100)
(R)
13481.58
9049
1924.
6,726.03
6638.03
6,896.37
7,925.12
5,998,569.99
547,71716
181
9.192.90
MWD OWSG (3)
13,511.83
9056
1918
6.725.75
6.637.75
6,926.68
7.935.23
5,998,59855
547,72711
1.81
9,223.14
MWD OWSG (3)
13,541.68
89.45
19.88
6.72574
663774
6.95496
7,945.35
5.998,62668
547,73709
380
9,252.99
MWD OWSG (3)
13,571.74
89.82
20.20
6,72593
6,63793
6,983.20
7,95565
5,998,65497
54774724
163
9,283.05
MWD OVISG(3)
13,601.78
90.00
1997.
6,725.98
6,637.98
7,011.41
7,96597
5,998,68324
547,757.40
0.97
9,313.09
MWD OWSG (3)
13,63349
90.49
21.08
6,725.84
6,637.85
7.041.11
7,97709
5,998,712.99
547.768.%
383
9,344.80
MWD OWSG (3)
13,661.58
90.58
2105
6,725.58
6,637.58
7,067.32
7,987.18
5,998,739.25
547.778.31
0.34
9.372.88
MWD OWSG (3)
13,691.98
90.40
2095
6,725.32
6637.32
7,095.70
7,998.08
5,998,76769
547,789.06
0.68
9,403.28
MWD OWSG (3)
13,716.13
90.64
2168
6,725.10
6,637.10
7,118.20
8,006.85
5998,790.23
54779771
3.18
9,427.42
MWD OWSG (3)
13,745.73
89.85
22.16
6,724.98
6,636.98
7,145.66
8,017.90
5,998.817.75
547,808.62
3.12
9,45700
MWD OWSG (3)
13,77560
9009
2294
6724.99
6,636.99
7.173.24
8.029.36
5.998,84539
547,819.92
2.73
9,486.84
MWD OWSG (3)
13,806.48
90.15
22.63
6.724.93
6,636.93
7.201.71
8.041.32
5.998,873.92
547,831.73
1.02
9,517.69
MWD OWSG (3)
13,83046
90.12
22.63
6,724.87
6,636.87
7,223.85
8,05054
5,996,896.10
547.840.84
0.13
9,54164
MWD OWSG(3)
13,85062
89.91
22.89
6,724.86
6,636.86
7,25166
8,052.21
5,998.923.97
547,852.36
1.11
9,571.77
MWD OWSG (3)
13,895.64
90.09
2221
6,724.86
6,636.86
7,284.00
8,075.64
5.998.956.38
547.865.61
2.01
9,606.75
MWD OWSG (3)
13,935.56
9003
21.96
6,724.82
6,63582
7,320.99
8,090.65
5,998.993.45
547,880.42
064
9,646.65
MWD OWSG (3)
13,960.52
89.85
21.56
6,724.85
6,636.85
7,344.17
8.099.90
5,999,016.68
547,889.55
1.76
9,671.59
MWD OWSG (3)
13,985.52
89.88
21.54
6,724.91
6,636.91
7,367.42
8,109.09
5,999,039.97
547,89861
0.14
9,696.59
MWD OWSG (3)
14,015.52
89.60
21.57
6.72504
6,63TG4
7.395.33
8.120.11
5.999,06793
547,903.48
0.94
9,726.57
MWD OWSG (3)
14,045.15
89.57
20.30
6,725.26
6,637.26
7,423.00
8.13069
5.999,09566
547,919.92
4.29
9,756.20
MWD OWSG (3)
14,088.00
89.57
20.30
6,725.58
6,63758
7,463.19
8,14556
5,999,135.92
547.934.57
0.00
9,799.05
PROJECTEDIOTD
Annotation
11202019 1: 35. 18PM Page 5 COMPASS 5000.14 Build 85H
NOV 2 2 2019
A0GC
Baker Hughes S
Date:
November 20, 2019
2191,28
31484
Letter of Transmittal
'To: From:
Abby Bell Harvey Finch
AOGCC Baker Hughes
333 West 7" Ave, Suite 100 ; 795 East 94" Avenue
Anchorage, Alaska 99501 Anchorage, Alaska 99515
.Please find enclosed the directional survey data for the following well(s):
1R-23L1PB1
1R-23UPB2
1R-23L1PB3
1F -07L1
1F -07L1-01
i
I
(5) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Harvey Finch, Baker Hughes, Wellplanner
Harvey. Finch C@bakerhuahes.com
I
219128
31484
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1R-23L1PB2
50-029-22200-71
Baker Hughes INTEQ Baker Hughes J
Definitive Survey Report
20 November, 2019
ConocoPhillips
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips Alaska Inc—Kuparuk
Local Co-ordinate Reference:
Project:
Kuparuk River Unit
TVD Reference:
Site:
Kuparuk 1R Pad
MD Reference:
Well:
1 R-23
North Reference:
Wellbore:
1 R-23LI PB2
Survey Calculation Method:
Design:
1R-2317 PB2
Database:
Project Kuparuk River Und, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Geo Datum:
NAD 1927 (NADCON CONUS)
MWD -INC ONLY_FILLER(INC>70')
Map Zone:
Alaska Zone 04
Survey (Wellbore)
Well
iR-23
1 R-23 (1 R-23)
Well Position
+N/5 0.00 usft
Northing:
11,800.20
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
Wellbore
1R -23L1 P62
Magnetics
Model Name
Sample Date
BGGM2018
11/1/2019
Design 1R-231-1 PB2
Audit Notes:
Version: 10 Phase: ACTUAL
Vertical Section: Depth From (TVD)
(usft)
88.00
Survey Program
Description
Date
From
To
MWD -INC ONLY_FILLER(INC>70')
(usft)
(usft)
Survey (Wellbore)
100.00
11,600.00
1 R-23 (1 R-23)
11,682.00
11,770.24
1R-23L1PB7 MWD -INC (1R-23LiP81)
11,800.20
12,170.46
IR-23LiPB1 MWD (1R -231-1P81)
12,190.00
12,964.88
1R-2311 P62 MWD (1R-2311 P82)
Well iR-23
1 R-23 @ 88 00usft (1 R-23)
1R-23 @ 88.00usft(1 R-23)
True
Minimum Curvature
EDT 14 Alaska Production
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
5,991,630.19usft
539,829.67usft
usft
Declination
(°)
1637
Tie On Depth: 12,170.46
+NIS
(usft)
0.00
+FJ -W
(usft)
0.00
Latitude:
Longitude:
Ground Level:
Dip Angle
80.88
Tool Name
Description
GCT -MS
Schlumberger GCT multishot
MWD -INC _ONLY (INC>10°)
MWD -INC ONLY_FILLER(INC>70')
MWD OWSG
OWSG MWD - Standard
MWD OWSG
OWSG MWD - Standard
Direction
(°)
15.00
Survey
Start Date
1/8!2001
10/17/2019
10/20/2019
10/23/2019
Baker Hushesg
70° 23' 17 076 N
149'40'33.721 W
0.00 usft
Field Strength
ren
57,403
Survey
End Date
10/20/2019
10/22/2019
10/24/2019
1112012019 136 06P Page 2 COMPASS 5000. 14 Build 85H
Survey
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips Alaska Inc_Kuparuk
Local Co-ordinate Reference:
Well 1 R-23
Project: Kuparuk River Unit
TVD Reference:
1R-23 @ 88.00usft (1 R-23)
Site: Kuparuk 1R Pad
MD Reference:
1R-23 @ 88.00usft (1 R-23)
Well: 1R-23
North Reference:
True
Wellbore: 1R-23L1P82
Survey Calculation Method:
Minimum Curvature
Design: 1R-23L1PB2
Database:
EDT 14 Alaska Production
Survey
Bo H.ghesg
111202019 1:36:06PM Page 3 COMPASS 5000.14 Build 85H
Map
Map
vertical
MD
Inc
Azi
TVD
TVDSS
-NIS
*EI -W
Northing
Eastin 9
DLS
Section Survey Toot Name
Annotation
(usft)
(1)
(1)
(usft)
(usft)
(usft)
(usft)
(ft)
(R)
(°1100')
(ft)
12,17046
85.98
68.76
6.782.55
6,694.55
5,824.25
7.32054
5.997,492 77
547,118.37
5.05
7,52049 MWD OWSG (31
TIP
12,190.00
W59
67.39
6.783.82
6,695.82
5.831.53
7,33863
5.997.500 15
547,136.42
7.66
7,53220 MWD OVVSG (4)
KOP
12,222.12
8960
68.10
6,784.88
6,696.88
5,843.69
7,368.34
5,997,51246
547,16606
963
7,55163 MWD OWSG (4)
12,25142
9166
66.25
6,784.56
6.696.%
5,855.05
7,395.34
5,99752397
547,193.00
9.45
7,56960 MM OWSG (4)
12,280.82
92.70
64.19
6,783.44
6,695.44
5,867.36
7,42201
5,997,53642
547.219.60
784
7588.40 MWD OWSG(4)
12,311.06
91.17
60.87
6,782.42
6,694.42
5,881.30
7,44882
5,997,550.50
547.245.33
1208
7,608.80 MWD OWSG (4)
12,340.57
91.87
5823
6,781.64
6,693.64
5,896.25
7,474.25
5,997,565.59
547.27168
925
7.629,82 MWD OWSG (4)
12,370.51
91.84
55.56
6,780.67
6,692.67
5,912.59
7499.32
5,997,582.06
547296.65
8.91
7,652.09 MWD OWSG (4)
12,400.76
91.14
52.63
6,779.88
6,691.88
5,930.33
7,523.81
5,997.599.92
547,32105
9%
7,675.56 MWD OWSG (4)
12,430.77
91.32
49.73
6.77924
6,69124
5.949.13
7.547.18
5,997.618.85
547,344.32
9.68
7,699.77 MWD OWSG (4)
12,460.38
93.47
47.77
6,778.00
6.690.00
5,968.64
7,56942
5.997,63847
547,366.45
9.82
7,724.37 MWD OWSG (4)
12,49040
9279
43.91
6,776.36
6688.36
5,989.51
7,590.92
5.997,65946
547,38TU
13.04
7,750.10 MWD OWSG (4)
12,520.80
93.78
40.41
6,77462
6,686.62
601201
7,611.29
5,997,68206
547406.08
11.95
7,777.10 MWD OWSG (4)
12,55040
9359
4105
6,77272
6,689.72
6,034.39
7,630.56
5,997.704.54
547.427.24
2.25
7,80371 MWD OWSG (4)
12,580.81
9344
44.27
6,770.85
6,682.85
6,05671
7,651.13
5,997.726 97
54744768
10.58
7,830.59 MWD OWSG (4)
12,605.99
9209
46.45
6,76964
6,68164
6,07438
7.669.02
5,997,744.73
547,465.48
10.17
7.85229 MWD OWSG J4)
12,636.05
92.86
49.13
6,768.34
6,680.34
6.094.56
7,691.26
5.997,765.02
547,48761
9.27
7,877.53 MWD OWSG (4)
12,666.19
9154
48.53
6.767.18
6.679.18
6114.38
7,713.93
5.99778497
597,510.17
4.81
7,902.55 MWD OWSG (4)
12,69627
9169
45.36
6766.33
6678.33
6,134.91
7.73590
5.997,80561
547,532.03
10.55
7,92806 MWD OWSG (4)
12.726.00
9187
41.88
6,765.41
6677.41
6,1%.41
7,756.40
5,997,82722
547552.41
11.72
7,954.14 MWD OWSG (4)
12,760.03
93.26
3864
6,763.89
6,675.89
6,182.35
7,778.37
5,997,853.28
547,574.24
10.35
7,984.88 MWD OWSG(4)
12.790.11
9350
36.51
6,762.11
667411
6,206.15
7,7%97
5,997,877.17
547.59242
7.11
8,01261 MWD OWSG (4)
12,818.96
94.05
33.87
6,76021
6,672.21
6.229.67
7,81327
5,997.900.78
547,608.88
9.33
8,03963 MWD OWSG (4)
12,85118
94.89
31.45
6.757,70
6.66970
6,256.72
7,83060
5,997.927.91
547,626.07
7.93
8,07023 MWD OWSG (4)
12,88042
9566
28.22
6,755.01
6,667.01
6,281.97
7,84508
5,997,95323
547,640.41
11.31
8,098.37 MWD OWSG (4)
12,909.94
95.84
2547
6,752.05
6,664.05
6,308.17
7,858.34
5,997,979.51
547,653.54
9.29
8,127.12 MWO OWSG (4)
12,935.61
96.00
23.13
6.749.41
6.661.41
6.331.44
7968.85
5.998,002 83
W.663.92
9.09
8,152.31 MWD OWSG (4)
12,964.86
96.30
20.52
6746.27
6.658.27
6.358.45
7,879.67
5.998,029.90
547.674.59
8.92
8,181.20 MWD OWSG (4)
13,010.00
9630
20.52
6,741.32
6,653.32
6,400.46
7,895.39
5,998,071.98
547,69009
0.00
8,225.84 PROJECTED NTD
Bo H.ghesg
111202019 1:36:06PM Page 3 COMPASS 5000.14 Build 85H
To
Nov 2 2 2019
AOGCC
Baker Hughes S
Date:
Abby Bell
AOGCC
333 West 7th Ave, Suite 10
Anchorage, Alaska 99501
219128
31485
Letter of Transmittal
November 20, 2019
From.
Harvey Finch
Baker Hughes
0 795 East 94th Avenue
Anchorage, Alaska 99515
;Please find enclosed the directional survey data for the following well(s):
1R-23L1PB1
IR-23L1PB2
1R-23L1PB3
1F -07L1
1F -07L1-01
i
(5) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Harvey Finch, Baker Hughes, Wellplanner
Harvey.Finch@bakerhughes.com
i
219128
31485
ConocoPhillips
ConocoPhillips Alaska Inc_Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1 R -23L1 PB3
50-029-22200-72
Baker Hughes INTEQ Baker Hughes�j
Definitive Survey Report
20 November, 2019
ConocoPhillips
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips Alaska Inc—Kuparuk
Local Co-ordinate Reference:
Project:
Kuparuk River Unit
TVD Reference:
Site:
Kuparuk 1R Pad
MD Reference:
Well:
1 R-23
North Reference:
Wellbore:
1 R -23L1 PB3
Survey Calculation Method:
Design:
1R -231-1P83
Database:
Project Kuparuk River Una, North Slope Alaska, United States
Map System:
US State Plane 1927 (Exact solution)
System Datum:
Geo Datum:
NAD 1927 (NADCON CONUS)
MWD4NC_ONLY_FILLER(INC>113')
Map Zone:
Alaska Zone 04
Survey (Wellbore)
Well
1 R-23
1 R-23 (1 R-23)
Well Position
-NI-S 0.00 usft
Northing:
11,800.20
+E/ -W 0.00 usft
Easting:
Position Uncertainty
0.00 us%
Wellhead Elevation:
Wellbore
1R -23L1 PB3
Magnetics
Model Name
Sample Date
BGGM2018
11/1/2019
Design 1R-23L1PB3
Audit Notes:
Version: 1.0 Phase: ACTUAL
Vertical Section: Depth From (TVD)
lush)
8800
Survey Program
Description
Date
From
To
MWD4NC_ONLY_FILLER(INC>113')
(usft)
(waft)
Survey (Wellbore)
100.00
11 600.00
1 R-23 (1 R-23)
11,682.00
11,770.24
1R-23L1PB1 MWD -INC (1R-23L1PB1)
11,800.20
12,111.10
1R-23L1PB1 MWD (1R-23L1PB1)
12.130.00
13,720 47
1 R -23L1 PB3 (1 R -23L1 PB3)
Well 1 R-23
1 R-23 @ 88.00usft (1 R-23)
1R-23 @ 88.00usft (1R-23)
True
Minimum Curvature
EDT 14 Alaska Production
Mean Sea Level
Using Well Reference Point
Using geodetic scale factor
5,991,630.19usft Latitude:
539,829.67usft Longitude:
usft Ground Level:
Declination Dip Angle
(1) (1)
16.37 80.88
Tie On Depth: 12,111.10
+N/ -S +FJ -W
(usft) (usft)
0.00 0.00
Tool Name
Description
GCT -MS
Schlumberger GCT multishot
MWD-INC_ONLY(INC>l0")
MWD4NC_ONLY_FILLER(INC>113')
MWD OWSG
OWSG MWD - Standard
MWD OWSG
OWSG MWD - Standard
eekerrwghe:g
70" 23' 17.076 N
149'40'33.721 W
0.00 usft
Field Strength
(nT)
57,403
Direction
(1
15.00
Survey
Survey
Start Date
End Date
1/8/2001
10/17/2019
10/2012019
10/20/2019
10/22/2019
10/25/2019
10/28/2019
11202019 1:36.52PM Page 2 COMPASS 5000 14 Build 85H
Survey
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company: ConocoPhillips Alaska lnc_Kuparuk
Local Co-ordinate Reference:
Well 1R-23
Project: Kuparuk River Unit
TVD Reference:
1R-23 @ 88.00usR (1R-23)
Site: Kuparuk 1 R Pad
MD Reference:
1R-23 @ 88.00usR (1R-23)
Well: 1R-23
North Reference:
True
Wellbore: 1R-23L1PB3
Survey Calculation Method:
Minimum Curvature
Design: 1R-23L1PB3
Database:
EDT 14 Alaska Production
Survey
Annotation
TIP
KOP
Baker Hughes S
11202019 1:36:52PM Page 3 COMPASS 5000. 14 Build 85H
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
-N/-S
+E/ -W
Northing
Easting
DLS
Section
(7
(1)
(usft)
(usft)
usft)
lust)
(-/100')
Survey Tool Name
(usft)
(R)
(ft)
IRI
12,111.10
8951
68.85
6,77989
6,69189
5.80327
7,265.09
5997,47150
547,063.04
5.17
7,485.87
MWD OWSG (3)
12,130,00
87.97
69.43
6.780,30
6,692.30
5,810.00
7,282.75
5997,47832
547,080.65
871
7,496.94
MWD OWSG (4)
12,160.56
86.65
66.49
6,781.74
6,693.74
5,821.45
7,31104
5,997,48992
547,108.88
10.54
7,515.33
MWD OWSG (4)
12,190.20
84.77
6374
6,783.95
6,695.95
6,833.89
7,33785
5,997,502.50
547.135.62
1122
7,534.28
MWD OWSG(4)
12,22161
86W
62.80
6,786.30
6,69830
5,84797
7,365.82
5.997,51674
547,163.52
677
7,555.12
MWD OWSG (4)
12,251.37
82.21
6244
6.789.18
6,701.18
5,861.59
7,392.12
5,997.53049
547,189.74
15.07
7,57508
MWD OWSG (4)
12,280.32
8244
69.19
6,793.04
6,705.04
5,874.48
7,41775
5,997,543.51
547.21530
6.04
7,594.16
MWD OWSG (4)
12,312.64
8323
69.42
6.797.10
6,709.10
5,887.18
7,447.40
5.997,55637
547,244.88
16.14
7,614.11
MWD OWSG (4)
12,34224
83.01
66.97
6,800.62
6,712.62
5,898.02
7,474.50
5,997,567.36
547,271.91
6.31
7,631.59
MWD OWSG (4)
12,37166
9074
68.34
6,802.23
6.714.23
5.909.18
7.501.65
5,997,57866
547,299.00
26.68
2649,40
MWD OWSG (4)
12.403.09
9107
66.09
680173
6,713.73
5.921.35
7,530.62
5,997,590.98
547,32291
723
7668.65
MWD OWSG(4)
12.431.88
87.73
63.20
6,802.03
6,714.03
5,933.67
7,556.63
5,997.60344
547,353.85
1534
7,687.29
MWD OWSG (4)
12,461.92
86.31
60.99
6,803.59
6,71559
5,94271
7,583.13
5.997.61762
547,380.28
8.74
7,707.71
MWO OWSG (4)
12,49128
87.57
60.64
6,805.16
6,717.16
5,962.01
7,60873
5.997,632.05
547.405.79
445
7,728.14
MWD OWSG (4)
12,521.23
8963
58.98
6,805.89
6,717.89
5,977.06
7,634.61
5,997,647.24
547.431.59
8.83
7,749.38
MWD OWSG (4)
12,551.84
91.13
5765
6,805.69
6,717.69
5,993.14
7,660.65
5,997,663.46
542457.54
6.55
7,771.65
MWD OWSG (4)
12,580.06
92.24
5509
6,804.86
6,716.86
6,OW,76
7,684.14
5,997,679.20
547,480.94
9.88
7,792.82
MWD OWSG (4)
12,610.33
9,195
53.17
6.802.96
6.714.96
6.026.46
7706.62
5.997,69203
547505.32
10.96
7,816.25
MWD OWSG(4)
12,640.30
9838
53.17
6,799.48
6,711.48
8,044.30
7,73244
5.997,71499
547,529.05
11.44
7,839.65
MWD OWSG (4)
1267038
102.82
53.18
6,793.95
6,705.95
6,06202
7,756.10
5,997,732.83
547.552.61
14.76
7,86288
MWD OWSG (4)
12,700.90
10.40
51.83
6,78625
6,698.25
6,079.99
7,779.53
5,997,750.93
547,57599
12.49
7,886.31
MWD OWSG (4)
12,730.88
106.96
4966
6,77765
6,68965
6,098.16
7,80177
5,997,76921
547.598.08
7.18
7,909.61
MWD OWSG (4)
12,761.14
106.83
4759
6,768.85
6,680.85
6,117.29
7.82349
5,997,78846
54261970
6.56
7,933.72
MWD OWSG (4)
12,79123
10560
45.84
6,760.45
6,672.45
6,137.10
7,844.52
5,997,808.38
547,640.63
692
7958.30
MWD OWSG (4)
12.821.24
10395
94.54
6,752.80
6,664.80
6.157.55
7,665.11
5,997,82894
547,661.10
6.91
7.983.38
MWD OWSG (4)
12,850.%
101.72
44.07
6,746.28
6,658.28
6,178.01
7,085.07
5,997,849.50
547,680.95
7.76
8,008.31
MWD OWSG (4)
12,88020
99.87
43.03
6,74073
6,652.73
6.199.11
7,905.13
5.997,87071
547,700.90
7.13
8,033.88
MWD OWSG (4)
1291105
97.88
42.52
6,735.97
6,647.97
6,221.49
7,92583
5,997,893.19
547,72147
6.65
8,060.85
MWD OWSG (4)
12,940.80
96.31
39.89
6,732.30
6,644.30
6,243.70
7,94527
5,997,915.50
547,740.60
10.24
8,087.33
MWD OWSG (4)
12.971.03
96.07
38.M
6,729.04
6,64104
6,267.01
7964.23
5,997,938.91
597,759.63
5.16
8,114.76
MWD OWSG (4)
Annotation
TIP
KOP
Baker Hughes S
11202019 1:36:52PM Page 3 COMPASS 5000. 14 Build 85H
ConocoPhillips Bake Hughe g
ConocoPhillips Definitive Survey Report
Company:
ConocoPhillips Alaska Inc_Kuparuk
Local Co-ordinate Reference:
Well 1R-23
Project
Kuparuk River Unit
TVD Reference:
1R-23 @ 88.00usft (1R-23)
Site:
Kuparuk 1R Pad
MD Reference:
iR-23 @ 88.00usft (1R-23)
Well:
iR-23
North Reference:
True
Wellbore:
iR-2311 PB3
Survey Calculation Method:
Minimum Curvature
Design:
IR-23LiPB3
Database:
EDT 14 Alaska Production
Survey
Annotation
11202019 1: 36'52PM Page 4 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Am
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Eastin g
DLS
Section
(usft)
(")
(o)
(usft)
(usft)
(usft)
(usft)
(o/100')
Survey Tool Name
(ft)
(ft)
(ft)
13,000.94
96.10
3535
6,725.87
6,637.87
6,290.81
7,982.07
5,997,962.81
54777734
9.94
8,142.37
MWO OWSG (4)
13031.03
96.13
33.72
6,722.66
6.634.66
6.315.46
7.999.03
5,997,98754
547794.16
5.39
8,170.56
MWD OWSG(4)
13,06094
95.97
30.95
6.719.51
6631.51
6.340.59
8.014.93
5,998,012 75
547,80994
9.23
8,198.95
MWD OWSG (4)
13,091.02
95.69
2835
6,716.45
6,628.45
6,366.59
8,02974
5,998,038.83
547,824.60
865
8,22790
MWD OWSG (4)
13,120.94
95.69
25.71
6,71349
662549
6,393.11
8.04327
5,998,065.42
547,837.98
8.78
8,25702
MWD OWSG (4)
13,150.58
95.23
23.25
6710.66
6,622.66
6,419.96
8,05549
5,998,092.33
547.850.06
841
8,286.12
MWD OWSG (4)
13,180.61
94.89
21.16
6,70802
6,620.02
6.44765
8,066.79
5,998,12008
547.861.22
702
8,315.79
MM OWSG (4)
13,210.76
94.06
18.20
6.705.65
6.61766
6,475.95
8,07692
5,998148.43
547,871.19
10.17
8,345.75
MWD OWSG (4)
13,24067
94.43
16.04
6,703.45
6,61545
6,504.45
8,08570
5,998 176.98
597879.82
7.31
8,375.55
MWD OWSG (4)
13,270.76
93.75
15.11
6,701.30
6,613.30
6,533.37
8,093.75
5,998,205.93
547,88772
3.82
8,405.56
MWD OWSG (4)
13.30066
91,60
1209.
6,699.91
6611.91
6,562.39
8.100.78
5.998,234.99
547,894.59
12.39
8.435.42
MWD OWSG(4)
13,330.76
8975
985
6.699.55
6.611.55
6,59194
8.106.50
5,998,264.56
547,900.15
965
8,465.44
MWD OWSG (4)
13.360.76
88.16
7.68
6,700.10
6612.10
6,621.58
8,111.07
5,998,294.22
547,904.57
8.97
8,495.25
MWD OWSG (4)
13,390.78
88.10
543
6,701.08
6,613.08
6,651.38
8,114.50
5,998,324.04
547,907.83
749
8,524.93
MWD OWSG (4)
13,42100
69.00
2.20
6,701,84
6.613.84
6,681.52
8,116.51
5.998,354 19
547903.66
11.09
8,554.56
MWD OWSG (4)
13,455.63
8978
0.16
6,702.21
6,614.21
6,716.14
8,117.22
5,998,38881
547.910.21
6.31
8,586.19
MWD OWSG (4)
13,48061
89.11
359.23
6,702,45
6,61445
6,741.12
8.117.09
5,90,413]8
597909.94
4.59
8,612.28
MWD OWSG (4)
13,51065
88.37
35828
6,703.12
6,615.12
6,771.14
8,116.43
5,998,443.80
547,909.13
401
8,641.11
MWD OWSG (4)
13,54060
85.79
357.06
6.70464
6,616.64
6601.03
8.115.22
599847367
547907.76
9.53
8,669.66
MWD OWSG (4)
13,570.70
83.32
356.94
6.707.50
6.619.50
6.830.95
8,113.65
5,998,503.58
547,90.03
8.22
8,698.16
MWD OWSG (4)
13,60o38
81.58
355.90
6,71140
6623.40
6,860.31
8.111.81
5996532.93
547,904.04
6.81
8,726.04
MWD OWSG (4)
13,630.68
81.0
35227
6.71597
6,627.97
6,890.10
8,10873
5.9%,W2 70
547,900.79
11,96
8,754.02
MWD OWSG (4)
13,660.47
80.81
350.58
6,720.65
6632.65
6,919.19
8,104.34
5.996591 77
547,80.25
5.68
8,780.98
MWD OWSG (4)
13,69047
60.61
351,85
6,725.50
6,63750
6,948.45
8,09982
5,90,621.00
547.891.57
4.23
8,808.07
MWD OWSG (4)
13,720.47
82.26
35354
6,729.97
6,641.97
6,977.87
8,06.05
5,90 ,650.40
547,887.65
7.83
,835.52
MWD OWSG (4)
13,760.0
82.26
353.54
6,735.29
6,647.29
7,01679
8,091.64
5998,68929
547,883.03
0.00
8,871.97
PROJECTED to TO
Annotation
11202019 1: 36'52PM Page 4 COMPASS 5000.14 Build 85H
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
James Ohlinger
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1R -23L1
Permit to Drill Number: 219-128
Sundry Number: 319-489
Dear Mr. Ohlinger:
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
w .aogcc.alaska.gov
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
SincerelyI& . Price
Chair
DATED this I day of November, 2019.
3BDMS14�NOV 9 5 2019
RECEIVE®
STATE OF ALASKA OCT 2 9 2019
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS AOGCC
9n AAC os oan
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑D
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool- ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: _Whipstock_❑
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
ConocoPhillips Alaska Inc
Exploratory ❑ Development Q.
Stratigraphic ❑ Service ❑
219-128 -
3. Address:
6. API Number:
PO Box 100360, Anchorage AK 99510
50-029-22200-60 ^.-c
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? N/A
KRU 11R-231-1
Will planned perforations require a spacing exception? Yes ❑ No ❑�
9. Property Designation (Lease Number):
10. Field/Pool(s):
ADL 25627, ALK 2560
1 Kuparuk River Field / Kuparuk Oil Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MO (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD):
Junk (MD):
12180' - 7004' 12178' 7003' 2841 NIA
N/A
Casing Length Size MD TVD Burst
Collapse
Conductor 79' 16" 123' 123'
Surface 6289' 9-5/8" 6331' 4072'
Production 12149' 7" 12178' 7003'
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
ITubing Size:
3-1/2"
Tubing Grade:Tubing
J-55 711610'
MD (ft):
11710'-11770'
6774'-6803'
Packers and SSSV Type: Baker HB Retrievable Packer
Packers and SSSV MD (ft) and TVD (ft): 11581' MD / 6713' TVD
12. Attachments: Proposal Summary �Wellbore schematic 0
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development ❑A • Service ❑
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations: N/A (Operations Shutdown)
IL ❑ WINJ ❑ WDSPL
❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date: 10/29/2019
Commission Representative: Victoria Loepp
GINJ ❑ Op Shutdown Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: James Ohlinger
Contact Name: Ryan McLaughli
Authorized Title: Staff CTD Engin Contact Email: an.MO1au hlin Co .COM
Contact Phone: 265-6218
Authorized Signature - Date: 9
COMMISSION USE ONLY
Conditions of approval: Notify Commission a representative may witness Sundry Number:
,soJthat
Plug Integrity ❑ BOP Test LJ Mechanical Integrity Test ❑ Location Clearance ❑
Other:75OF f-ls f- �s6o� 5 -3BDMS -�NOV 0 5 2019
lin rt v/a���<revit-r frsf �1 Z��P`X`5 wcll o�cnzfro ns and
5\
�V brV 1 1/ �uY�+-1 m Q r1J� Of
zr7
Post Initial Injection MIT Req'd? Yes ❑ No ��,/ % flq:5 � C( *te 06"--f t4) f 0+1 fiC 2-5-IDJ
Spacing Exception Required? Yes o LTJ Subsequent Form Required: /0 — 4 b 4
y1
Approved by: COMMAPPROVED BY
ISSIONER •, ���
THE COMMISSION Date:
' ' `� v , ` h I t \ A L uS�Form and
F 10-403 evil d 4/2017 Approved application is valid for 12 months from e d of approval. Attachments in Duplicate
KRU 1R-23 CTD Summary for Sundry (Operations Shutdown)
Summary of Operations:
On October 16th CDR3-AC rigged up on KRU well 1 R-23 (191-101) to drill tri -lateral CTD project. After
3 unsuccessful attempts at drilling the 1 R-231-1 lateral (219-128), primarily due to hole cleaning issues
in the 7" production casing, the decision was made to rig down CDR3-AC from 1 R-23 and set the well
up for a cement pilot hole exit for the rig to come back at a later date and complete the scope of the
project under the approved PTD
In preparation for resuming CTD operations on this well, perforations will be shot in the tubing tail,
cement will be pumped to occupy the 7" casing and plug off C -sand perforations, and the XN nipple in
the tubing tail will be milled out. A subsequent application for Sundry Approvals will be submitted for the
wellwork plans laid out.
CDR3-AC will plan to return in December 2019 to mill a cement pilot hole, set a 3-1/2" whipstock, mill a
2.80" window in the production casing at a depth of 11,662' MD, and drill the rest of the tri -lateral project
to the original scope.
Page 1 of 1 10/29/2019
McLaughlin, R an
From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Sent: Tuesday, October 29, 2019 10:18 AM
To: McLaughlin, Ryan
Cc: Ohlinger, James J
Subject: [EXTERNAL]KRU 1 R-231_1 (PTO 219-128) Operations Shutdown Request
Ryan,
Verbal approval is granted for the Operations Shutdown for CRD3-AC for KRU IR-23L1(PTD 219-128).
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria LoePg@alaska goy
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding if, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907) 793-1247 or Victoria LOenD@alaska aov
From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Sent: Tuesday, October 29, 2019 10:13 AM
To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Cc: Ohlinger, James J <James.J.Ohlinger@conocophillips.com>
Subject: 1R-23 (PTD 191-101) Operations Shutdown Request
Hello Victoria
On October 16th CDR3-AC rigged up to drill a tri -lateral project on 1R-23. After 3 unsuccessful attempts at drilling the
1R-231_1 lateral, primarily due to hole cleaning issues in the 7" production casing, the decision was made to rig down
CDR3-AC from 1R-23 and set the well up for a cement pilot hole exit for the rig to come back at a later date and
complete the scope of the project under the approved PTD.
In preparation for resuming CTD operations on this well, perforations will be shot in the tubing tail, cement will be
pumped to occupy the 7" casing and plug off C -sand perforations, and the XN nipple in the tubing tail will be milled out.
CDR3-AC will mill a cement pilot hole, set a 3-1/2" whipstock, and mill a 2.80" window in the production casing at a
depth of 11,662' MD and complete the original scope of the project under the existing permits .
i
We are requesting verbal approval for an Operations Shutdown with the Sundry to ne submitted today. We will also
ment-squeezing the c -sand perforations and setting a new whipstock prior to
submit a subsequent sundry request for ce
beginning the service coil work.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
Time Log & Summary Report AOGCC
1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/16/2019
Rig Release
Time Log
StartTme
EndT..
our
(no
Shin Depth
rIKS)
End Depth
(We)
Phase
Op Code
AefivMCode
Tune P
-T-X
Operation
10/15/2019
10/15/2019
1.00
0.0
0.0
MIRU
MOVE
CTOP
P
Install pull plate, PJSM, perform damaged coil
12:00
13:00
procedure with rig CTC, repeat with BOT
external CTC, trim 2 7' section of Coil for testing,
prep Coil for shipment.
10/15/2019
10/15/2019
4.00
0.0
0.0
MIRU
MOVE
CTOP
P
Begin decomission of reel (#53723/16600),
13:00
17:00
install grapple into Coil, remove inner reel iron
and bulkhead, remove wash pipe, remove
horses head Counter, pin back INJH counter.
10/15/2019
10/15/2019
1.00
0.0
0.0
MIRU
MOVE
CTOP
P
Unstab coiled tubing from INJH, secure Coil to
17:00
18:00
spool, remove saddle clamps, reel in hanging
10/15/2019
10/15/2019
1.50
0.0
0.0
MIRU
MOVE
CTOP
P
Prep to remove reel from rig, remove bombay
18:00
19:30
door dike, remove king pin, bombay doors, open
doors
10/15/2019
10/15/2019
1.00
0.0
0.0
MIRU
MOVE
CTOP
P
Trucks on location, PJSM, Load out reel, secure
19:30
20:30
onto truck.
10/15/2019
10/15/2019
1.00
0.0
0.0
MIRU
MOVE
CTOP
P
Move in and spot reel for pick. load reel into rig.
2030
21:30
10/15/2019
10/15/2019
1.00
0.0
0.0
MIRU
MOVE
CTOP
P
Remove side door stripper from INJH, cleanout
21:30
22:30
1
sump and inspect
10/15/2019
10/16/2019
1.50
0.0
0.0
MIRU
MOVE
CTOP
P
Set reel in saddles, shim reel hubs, Install
22:30
10000
1
saddle clamps. Prep reel for stabbing
10/16/2019
10/16/2019
6.00
0.0
0.0
MIRU
MOVE
CTOP
P
Stab CT into injector, Make up CTC, M/U Inner
00:00
06:00
reel iron, M/U pressure bulkhead, Nipple down
ROPE, RID cellar
10/16/2019
10/16/2019
6.00
0.0
0.0
MIRU
MOVE
RURD
P
Complete RD, Peak trucks arrive, PJSM, hook
06:00
12:00
up to sows & pull off well, jeep up modules
10/16/2019
10/16/2019
4.50
0.0
0.0
MIRU
MOVE
MOB
P
Move from 1A-Pad to 1R-Pad
12:00
1630
10/1612019
10/16/2019
2.30
0.0
0.0
MIRU
MOVE
MOB
P
Spots sub & pits over 1 R-23, lay mats
16:30
1848
10/16/2019
10/16/2019
1.50
0.0
0.0
MIRU
MOVE
RURD
P
Begin RU checklist, drops stairs, secure
18:48
20:18
landings, move shop & 1/2-Way house to 1 R-
Pad & spot up
10/16/2019
10/16/2019
2.20
0.0
0.0
WHDBOP
NUND
P
Continue RU checklist, NU BOPE, MU MP line
2018
22:30
FRU
to tango valves
" Rig Accepted: 10/16 Q 22:30 hm
10/16/2019
10/17/2019
1.50
0.0
0.0
MIRU
WHDBOP
RURD
P
Continue RU checklist, MU PUTZ, MU tiger-tank
2230
00:00
hardline, begin greasing all valves post N2 blow-
down, grease tree valves, swabs, & tango valves
10/17/2019
10/17/2019
0.80
0.0
0.0
MIRU
WHDBOP
RURD
P
Complete RU, Complete greasing valves,
00:00
00:48
1
Complete prep for BOP tests
10/17/2019
10/17/2019
0.70
0.0
0.0
MIRU
WHDBOP
PRTS
P
PJSM, fluid pack lines, cycle & bleed off drilling
00:48
01:30
choke, perform shell test
10/17/2019
10/17/2019
7.00
0.0
0.0
MIRU
WHDBOP
BOPE
P
Perform intial ROPE test (250 psi low / 3500 psi
01:30
08:30
high) Fail Pass on R7
" Witnessed by Lou Laubenstein of the AOGCC
10/17/2019
10/17/2019
2.00
0.0
0.0
MIRU
WHDBOP
BOPE
P
Fill Coil test inner reel iron, pressure bulkhead,
08:30
10:30
1
and stripper
10/17/2019
10/17/2019
1.00
0.0
0.0
PROD1
WHPST
PRTS
P
Pressure test PDL's and TT line
10:30
11:30
1
10/17/2019
10/17/2019
1.00
0.0
0.0
PROD1
WHPST
RGRP
P
Replace bales on top drive
11:30
12:30
10/17/2019
10/17/2019
1.80
0.0
76.9
PRODt
WHPST
PULD
P
PJSM.M/U BHA#1 with 1° WFT fixed bend
12:30
1418
motor, 2.74" String reamer, and 2.74" diamond
window mill. PD BHA#1
10/17/2019
10/17/2019
2.10
76.9
11,120.0
PROW
WHPST
TRIP
P
RIH, EDC open, Pumping seawater
1418
16:24
10/17/2019
10/17/2019
0.20
11,120.0
11,515.0
PROD?
WHPST
DLOG
P
Log K1 for+182', (new Coil), Inspect counter,
1624
16:36
PUW=39K
Page 1/14 Report Printed: 10/2912019
Time Log & Summary Report AOGCC
1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 1 0/1 61201 9
Rig Release:
Time Log
start Time
End Trite
Dw
rv)
sten Depth
(ftKB)
End Depth
(fiKB)
Phese
Op Code
AeW Cade
Time P
-FXrpsi
Ope.tbn
10/17/2019
10/17/2019
1.30
11,515.0
11,680.9
PROW
WHPST
DISP
P
in well, tag nipple at 11,598', pickup,
1636
17:54
C, bring on pumps, get right through,
to milling fluid, dry tag TOWS at
'
10/17/2019
10/17/2019
2.10
11,680.9
11,682.4
PROD1
WHPST
WPST
P
umping at 11,680.9', FS = 709 psi @ 1.9
1754
20:00
T = 14.3K, WOB = -0.7K, annular =
(11.8 ppg at window), WHP = 145 psi,
4791 psil.9 bpm in, 1.82 bpm out,
vibrations climb to 3's
10/17/2019
10/18/2019
4.00
11,682.4
11,685.2
PROD1
WHPST
WPST
P
Milling @ 11,682.4', CWT = 13.3K, WOB = 1.4K,
20:00
0000
annular = 4117 psi, WHP = 148 psi, pump -
4850 psi, vibrations to 3's
10/18/2019
10/18/2019
0.50
11,685.2
11,685.8
PROD1
WHPST
WPST
P
Milling @ 11,685.2', CWT= 13.9K, WOB=0.3K,
00:00
00:30
annular =4120 psi, WHP= 151 psi, pump=
4786 psi
TOWS = 11,681', BOW = 11,684.5'
Pre -load DS PDL with build/tum tools
10/18/2019
10/18/2019
3.00
11,685.8
11,710.0
PROD1
WHPST
WPST
P
String reamer out, begin pushing on it, PUW =
00:30
03:30
35K at 11,707' (PU to adjust TF), mill rat -hole to
11,710% PUW = 36K
10/18/2019
10/18/2019
1.30
11,710.0
11,710.0
PROD?
WHPST
REAM
P
Perform reaming passes 5R, 35R, 335R, &
03:30
04:48
185R, dry drift up & down, clean
10/18/2019
10/18/2019
1.00
11,710.0
11,710.0
PROW
WHPST
REAM
P
Perform additional reaming passes to ensure
04:48
05:48
ultra smooth window, Confirm TD @ 11710 after
dry drift
10/18/2019
10/18/2019
2.00
11,710.0
55.0
PRODi
WHPST
TRIP
P
Trip out of hole, Open EDC @ 11610'
05:48
07:48
10/18/2019
10/18/2019
0.80
55.0
0.0
PROD1
WHPST
PULD
P
Tag up, Space out, PUD BHA#1. Mills out @
0748
08:36
2.74 Go, 2.73 No Go
10/18/2019
10/18/2019
1.00
0.0
62.6
PROD1
DRILL
PULD
P
Reconfig BHA, Not running USR, PD BHA#2
0836
09:36
with 2.5° AKO motor and RB Hughes bi center.
Make up to Coil and surface test. Check pack
offs.
10/18/2019
10/18/2019
2.20
62.6
11,080.0
PROD1
DRILL
TRIP
P
Trip in hole, BHA #2
0936
11:48
10/18/2019
10/18/2019
0.10
11,080.0
11,133.0
PROD1
DRILL
DLOG
P
Lag K1 for+21.5', Close EDC
11:48
11:54
10/16/2019
10/18/2019
0.20
11,133.0
11,710.0
PROD1
DRILL
TRIP
P
Continue in well, Wt chk @ 11635 36K, Clean
11:54
12:06
pass through window
10/18/2019
10/18/2019
1.10
11,710.0
11,755.0
PROD1
DRILL
DRLG
P
11710', Drill, 1.91 BPM @ 4400 PSI FS,
1206
13:12
BHP=4155, Drill to EOB @ 11755' Near bit INC
1@88'
10/18/2019
10/18/2019
0.20
11,755.0
11,100.0
PROD1
DRILL
TRIP
P
End of build PUH totie into Kt
13:12
13:24
10/18/2019
10/18/2019
0.20
11,100.0
11,132.0
PROW
DRILL
DLOG
P
Log K1 for+1 foot.
13:24
13:36
10/18/2019
10/18/2019
0.10
11,132.0
11,700.0
PROD1
DRILL
TRIP
P
RBIH to log RA marker
13:36
13:42
10/18/2019
10/18/2019
0.10
11,700.0
11,724.0
PRODi
DRILL
DLOG
P
Log RA @ 11,689', TOWS @ 11682, TOW @
13:42
13:48
11,685, BOW @ 11,688
10/18/2019
10/18/2019
2.10
11,724.0
65.1
PROW
DRILL
TRIP
P
Pull up through window, Open EDC, POOH
13:48
1554
10/18/2019
10/18/2019
1.00
65.1
0.0
PROW
DRILL
PULD
P
At surface, PJSM, Tag up space out. PUD BHA
15:54
16:54
#2 build section BHA
10/18/2019
10/18/2019
1.10
0.0
78.0
PRODt
DRILL
PULD
-15-
PD BHA#3 Drilling Assembly (NOV Agitator, 0.5°
16:54
18:00
AKO motor, new Baker Dyna -Pilot bit), slide in
cart, check pack -offs, MU to coil, tag up, set
counters
10/18/2019
10/18/2019
1.00
78.0
11,100.0
PROD1
DRILL
TRIP
P
RIH w/BHA #3
18:00
19:00
Page 2114 ReportPrinted: 10/29/2019
Time Log & Summary Report AOGCC
1 R-23
. Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/16/2019
Rig Release
Time Log
Steri Time
End Time
our
into
Stan Depth
(RKB)
End Depth
(MB)
Phase
00 cotle
ActAy Code
Tune P
-T-X
OPeratwn
10/18/2019
10/18/2019
0.20
11,100.0
11,152.0
PROD1
DRILL
DLOG
P
log Kt for+16' correction
19:00
19:12
10/18/2019
10/18/2019
1.50
11,152.0
11,680.0
PROD?
DRILL
TRIP
P
Continue RIH, PUW = 36K @ window,
19:12
2042
Stack weight at window @ 10 fpm @ DTF
(-11,685'), PU & spin bit, RIH at 15 fpm, no good
(-11,688'), PU spin bit, pumps off, RIH @ 30
fpm, stack at -11,686', PUW = 36K, oreint TF
15° ROHS @ 30 fpm, stack at -11,688', orient
TF 10° ROHS @ 20 fpm no-good
10/18/2019
10/18/2019
0.80
11,680.0
11,680.0
PROD1
DRILL
CIRC
T
Confer with town, work plan forward (no 2.74"
crayola mills on slope), decison made to POOH
20:42
21:30
for 0.5° AKO motor, 2.74" string reamer & 2.74"
DSM
10/18/2019
10/18/2019
2.00
11,680.0
78.0
PROD1
DRILL
TRIP
T
POOH, tag up, PJSM
21:30
23:30
10/18/2019
10/19/2019
0.50
78.0
78.0
PRODI
DRILL
PULD
T
Begin PUD BHA #3
23:30
00:00
10/19/2019
10/19/2019
0.70
78.0
0.0
PROD1
DRILL
PULD
T
Complete PUD BHA#3, considerable marking
on motor, marks are LS below wear -band & HIS
0000
0042
above wear -band, possible binding up in window
with motor
10/19/2019
10/19/2019
1.00
0.0
63.0
PROD1
DRILL
PULD
T
PD BHA #4 Window Dressing Assembly (0.5°
0042
0142
AKO motor, 2.74" string reamer, & 2.74" DSM),
slide in cart, check pack -offs, MU to coil, tag up,
set counters
10/19/2019
10/19/2019
2.00
63.0
11,075.0
PROW
DRILL
TRIP
T
RIH w/ BHA #5 Window Dressing Assembly
01:42
03:42
10/19/2019
10/19/2019
0.20
11,075.0
11,137.0
PROD1
DRILL
DLOG
T
Log K1 for +1 3.5'correction
03:42
03:54
10/19/2019
10/19/2019
0.20
11,137.0
11,684.0
PROD?
DRILL
TRIP
T
Continue RIH to window, PUW=37K
03:54
04:06
10/19/2019
10/19/2019
0.60
11,684.0
11,684.0
PROD1
DRILL
REAM
T
Dress window, FS = 488 psi @ 1.9 bpm, mill at 1
04:06
0442
fpm from 11,684' on initial pass (oriented 5°
ROHS), observe -90 psi motor work at
-11,686.8', then clean to past bottom of window
to11,700', back -ream at 5° ROHS, perform an
addiontal as milled pass (down & up), clean bath
ways
10/19/2019
10/19/2019
1.10
11,684.0
11,684.0
PROW
DRILL
REAM
T
Dry drift window up & down, 30 fpm, clean
04:42
05:48
Perform additonal reaming passes, 35R, 335R,
& 185R, dry drift, clean up & down
10/19/2019
10/19/2019
1.90
11,684.0
60.0
PROD1
DRILL
TRIP
T
POOH
05:48
07'.42
10/19/2019
10/19/2019
1.00
60.0
0.0
PROD1
DRILL
PULD
T
At surface, Tag up space out. PJSM, PUD
07:42
08:42
BHA#4 Window dressing BHA
10/19/2019
10/19/2019
0.80
0.0
78.3
PROD1
DRILL
PULD
T
M/U and PD BHA #5 Lateral drilling BHA with .5`
08:42
C
09:30
motor and DynaPilot Bi center bit
10/19/2019
10/19/2019
2.00
78.3
11,111.0
PROW
DRILL
TRIP
T
00' -
RIH BHA# 5, Shallow test agitator@ 500'-
09:30
11:30
Good
10/19/2019
10/19/2019
0.30
11,111.0
11,140.0
PROD1
DRILL
DLOG
T
Log K1 for +18 -correction, PUW=33K
11:30
11:48
10/19/2019
10/19/2019
0.10
11,140.0
11,740.0
PR0D1
DRILL
TRIP
T
Continue in well. Clean pass through window
11:48
1154
10/19/2019
10/19/2019
0.10
11,740.0
11,757.0
PROW
DRILL
DLOG
P
Log MADD Pass
11:54
12:00
10/19/2019
10/19/2019
1.60
11,757.0
11,889.0
PRODt
DRILL
DRLG
P
11757', Drill, 1.88 BPM @ 4765 PSI FS,
BHP=4155, RIW=10.8K, DHWOB=I.9K Swap
12:00
13:36
mud to system 1. New mud at bit 11,795'
10/19/2019
10/19/2019
0.10
11,889.0
11,889.0
PROD1
DRILL
WPRT
P
111,866, BHAwiper, PUW=37K. New mud around
13:36
13:42
got pressures
Page 3114 Report Printed: 10/29/2019
Time Log & Summary Report Ai
1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10116/2019
Rig Release:
Time Log
Our
(hr)
Start Deptlt
(ftl B,
EnE Depth
(ftKB)
Phase
Op Cade
Activity Cafe
Tine P
-LX
OpereGon
Start Time
10/19/2019
End Time
10/19/2019
2.20
11,889.0
12,155.0
PROD1
DRILL
DRLG
P
11889', Drill, 1.92 BPM @ 4870 PSI FS,
BHP=4200, RIW=10.81k, DHWOB=2.3K. Trouble
1342
1OM95:54
getting angle to drop from 11970. Lower pump
rate and increase WOB.
10/19/2019
10/19/2019
0.80
12,155.0
12,155.0
PRODt
DRILL
WPRT
P
Pull wiper to 11715. First wiper after drilling 400'.
PUW=38K. Trip in slowly waiting to obtain
15:54
16:42
polygon extension
10/19/2019
10/19/2019
1.30
12,155.0
12,355.0
PRODi
DRILL
DRLG
P
12155', Drill, 1.87 BPM @ 4810, BHP -4219
16:42
10/19/2019
18:00
10/19/2019
3.30
12,355.0
12,497.0
-F5-Roo
DRILL
DRLG
P
Drilling, PUW = 38K (obtain parameters), FS =
1100 psi @ 1.9 bpm, CWT = 4K on bottom,
1800
21:18
WOB = 2.5K, annular = 4224 psi (11.85 ppg @
window), WHP = 160 psi, pump = 5133 psi,
drilling slowed at 12,389', avg ROP = 43 fph
10/19/2019
10/20/2019
2.70
12,497.0
12,520.0
PRODi
DRILL
DRLG
P
Drilling, CWT = 6.7K @ 3.8K WOB, annular=
4232 psi (11.85 ppg @ window), WHP - 204 psi,
21:18
00:00
pump = 5098 psi, pump sweeps as required,
PUW = 38K from 12,504', pump 10 x 10 (LOVS
with 2.5% Dri1lZOne to aid w/ bit balling), allow
pill to exit with bit spinning off bottom, pump 5x5
sweeps, avg ROP = 8.5 fph
10/20/2019
10/20/2019
0.50
12,520.0
11,700.0
PRODt
DRILL
WPRT
P
Wiper to tubing tail, PUW = 35K, jog 7" casing
00:00
00:30
10/20/2019
10/20/2019
0.10
11,700.0
11,752.0
1ROD1
DRILL
FLOG
P
Log RA for +5' correction
00:30
10/20/20 19
00:36
10/20/2019
0.40
11,752.0
12,520.0
PROD,
DRILL
WPRT
P
Wiper in-hole, RIW = 12K
00:36
10/20/2019
01:00
10/20/2019
1.30
12,520.0
12,575.0
PRODt
DRILL
DRLG
P
Drilling, FS = 1154 psi @ 1.9 bpm, CWT = 12K
@ 0.6K WOB, annular =4224 psi, WHP = 193
01:00
02:18
psi, pump = 4972 psi, drilling break at -12,575'
1020/2019
10/20/2019
2.50
12,575.0
12,668.0
PROW
DRILL
DRLG
P
Drilling, CWT= 11.4K, W0B = 1K, annular=
4240 psi, WHP = 208 psi, pump = 5138 psi, avg
02:18
04:48
ROP = 37 fph
10/20/2019
10/20/2019
0.10
12,668.0
12,668.0
PROD1
DRILL
WPRT
P
BHA wiper, PUW = 40K, RIW = 11.3K
04:48
10/20/2019
04:54
10/20/2019
2.00
12,668.0
12,746 0
-PROD
DRILL
DRLG
P
Drilling, FS = 1121 psi @ 1.9 bpm, CWT = 10.2K
@ 1.9K WOB, annular = 4249 psi, WHP = 190
04:54
06:54
psi, pump = 5173 psi
1020/2019
10/20/2019
0.30
12,746.0
12,746.0
PROD,
DRILL
WPRT
P
12746, BHA wiper, PUW-40K
0654
1020/2019
07:12
10/20/2019
4.00
12,746.0
12,950.0
PROD1
DRILL
DRLG
P
12746', Drill 1.88 BPM @ 5000 PSI FS,
BHP=4165, RIW=11K, DHWOB=IK
07.12
10202019
11:12
1020/2019
0.50
12,950.0
12,950.0
PROD1
DRILL
WPRT
P
1000'wiper trip #1, PUW=40K. Some slight
stacking @ 12600-12700 Lower speed / Rate
11.,2
1142
slightly
10/20/2019
10/20/2019
2.80
12,950.0
13,105.0
PROW
DRILL
DRLG
P
1.88 BPM @ 5000 PSI FS,
11:42
1430
BHP 41601,
10/20/2019
10/20/2019
0.10
13,105.0
13,105.0
PRODi
DRILL
WPRT
P
BHA wiper, PUW=40K
14:30
1020/2019
14:36
10/20/2019
1.50
13,105.0
13,193.0
F5'
DRILL
DRLG
P
Drill,, 1.88 BPM @ 5085 PSI FS,
13105.1P
14:36
16:06
102020,9
10/20/2019
0.10
13,193.0
13,193.0
PROD1
DRILL
WPRT
P
BHA Wiper, PUW=39K, RIW=BK
1606
1020/2019
16:12
1020/2019
1.80
13,193.0
13,302.0
PROD1
DRILL
DRLG
P
13193', Drill, 1.88 BPM @ 5065 PSI FS,
16:12
18:00
1
1
1
BHP=4274,
1020/2019
10/20/2019
0.70
13,302.0
13,350.0
PROD7
DRILL
DRLG
P
D7C9@OB,analar=
4277 psi, pump
18:00
18:42
pump 5x5 sweeps
Page 4114 Report Printed: 10/29/2019
'- Time Log & Summary Report AOGCC
IR-23
, Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/1612019
Rig Release:
Time Log
Dur
Statl B)
En( Depth
(nicB)
phase
Op Cotle
Tme
ActivRy CoEe
P
-T-X
Operetbn
Statl Tme
Ertl Time
11n
PROD1
DRILL
WPRT
P
pulling
2,980 il,upto-6K(a1t12,791')WOB&
10/20/2019 10/20/2019
0
1.00
13,350.0
3,
,623.0
eiavyaot
18:42
1942
62K CWT, observe motorwork, jog 7" casing
(pull
heavy to varying degrees from -12,600' to
-12,860', then return to normal weights)
10120/2019
10/20/2019
0.10
11,623.0
11,724.0
PROD1
DRILL
DLOG
P
Window PUW=37K,log RAfor+9.5'correction,
19:42
10/20/2019
19:48
10/20/2019
0.70
11,724.0
13,350.0
PROD1
DRILL
XPRT
P
Wiper in-hole
19:48
20:30
12,615' stack weight, PUW = 43K, -1K WOB,
reduce rate to lbpm, stack at 12,605'(2.5K
WOB), reduce rate to 0.9 bpm, 20 fpm, stack at
12,6821(2K WOB) & 12,693', reduce to 0.8 bpm,
stack weight at 12,685', reduce speed to 6 fpm,
work to 12,9701, begin increasing rate & RIH
speed at 12,970'.
Recap: Difficulty RIH 12,615' to 12,970', -15 fpm
@ 1 bpm to get down
10/20/2019
10/20/2019
0.50
13,350.0
12,610.0
PROD?
DRILL
WPRT
P
Wiper back up-hole, attempt to cleanup 12,970'
to 12,615', 1.9 bpm, 15-25 fpm, pull to 55K, at
20:30
21:00
12,986', 12,678' negative WOB tug, observe
motor work, hole appears to be cleaning up
10/20/2019
10/20/2019
0.70
i2, 610.0
12,350.0
PROD1
DRILL
WPRT
P
Wiper in-hole, stack at 12,612',1.0-1.2 bpm@
10-25 fpm, attempt to increase rate at speed
21:00
21:42
once past 12,970', stacked weight at 13,179'
RIW off bottom = 1.81K
10/20/2019
10/21/2019
2.30
13,350.0
13,467.0
PROD1
DRILL
IT
P
Drilling, FS 11138 psi @ 1.9 bpm, CWT=-2.BK
@ 0.9K WOB, annular = 4241 psi, WHP = 92
21:42
00:00
psi, pump = 5202 psi, avg ROP = 50 fph
10/21/2019
10/21/2019
1.80
13,467.0
13,569.0
PROD1
DRILL
DRLG
P
Drilling, FS = 1152 psi @ 1.9 bpm, CWT =-2K
@ 1K WOB, annular=4260 psi, WHP = 127 psi,
00:00
01:48
pump = 5236 psi, swap to new mud system #2,
new mud hits bit at 13,530'
10/21/2019
10/21/2019
3.20
13,569.0
13,750.0
PR0D1
DRILL
DRLG
P
New mud around, PUW = 42K (new
) 0 1.86 bpm,
3K@ p=46
01:48
05:00
WOB, annular68
CWT etIKn3 psi,
WHIP = 278 psi, pump = 4910 psi, pump 5x5
sweeps
10/21/2019
10/21/2019
0.80
13,750.0
13,750.0
PR0D1
DRILLRWPRTP
Wiper up-hole, PUW=42K
05:00
05:48
13,750.0
13,928.0
PRODl
DRILL131-113=4304,
I BPM
10121/2019
10/21/2019
3.70
RIW
0548
10/21/2019
09:30
10/21/2019
0.10
13,928.0
13,928.0
PROD1
DRILLBHA
Wiper, PUW=45K
09:30
10/21/2019
09:36
10/21/2019
4.00
13,928.0
14,074.0
PRODi
DRILL
13928' Dnall, 1.87 BPM @ 4937 PSI FS,
09:36
10/21/2019
13:36
10/21/2019
1.10
14,074.0
14,074.0
PROD?
DRILL14074',
Pull 500' wiper, PUW=43K.Good coming
up. Stacking RIH. Reduce pump rate to .8 BPM.
13:36
1442
Reduce speed - 15 FPM. No DHWOB
10/21/2019
10!21/2019
1.10
14,074.0
14,088.0
PRODt
DRILL
DRLG
P
14074'. 30241'14070 ROP down to 55195 I 10 FPH
14:42
1548
from 30 to 50 FPH
10/21/2019
10/21/2019
1.30
14,088.0
11,642.0
FROM
DRILL
WPRT
P
Stacking, Go to witPAIh Pull
Very sticky, PUWo12,615
wiper window with sweeps, 12,970 to 1
15:48
17:06
p,
Ratty with over pulls. Packing off coming up,
with
become detained @ packed off at 11,642', lose
returns
10/21/201910/21/2019
0.30
11,642.0
11,642.0
PROD1
DRILL
CIRC
P
backside, work pipe down, become free, regain
1706
17:24
returns
Page 5/14 ReportPrinted: 1012912019
Start Time Entl
10/21/2019 10/21/2(
17:24 20:30
22:30LL'Sb
10/21 /2019 10/21.
22:36 23:24
23:24 10000
36
Time Log & Summary Report AOGCC
IR -23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/1612019
Rig Release:
Phase
mp 5,5 sweeps, circulate bottoms up, pump
x10 sweeps, decison made to wiper to swab
dean up cased hole
Continue Rim, VUvv = son at wnmow,
weight at 11,681', PU & roll pumps, stack at
11,685', bdng on pump, jog 7", attempt to clean
up near TOWS, stack again at 11,685', attempt
at 0.25 bpm, stack at 11,683', attempt 20° R from
as milled TF, stack at 11,683', attempt 15°
LOHS, no good, confer with town, decison made
to POOH for cleanout assembly
Pump sweeps, open EDC, begin POOH
/2019 0.90 78.0 0.0 mnU urrt "' 2 plugged noales, & 10 chippedibroken reamer
cutters
/2019 1 20 0.0 72.0 PROD1 DRILL PULD T motor s& 22..74"I D331 ridge -ser, slide in cea -out Assembly (0.5' e , MU
to wil, check pack -offs. MU to coil
05:42 105:48
09:12
11:06
10/22/2019
10/22r
11:06
14:06
10/22/2019
10/22/:
14:06
15:12
t 0122/2019
107221,
15:12
16:06
10/22/2019
10/22/'.
16:06
18:12
10122/2019
10/22/
18:12
18:18
10/22/2019
10/221
18:18
18:48
10/22/2019
10/221
18:48
18:54
10/22/2019
10/22
18:54
21:06
1.9 BPM @ 4680 PSI FSStack out @ 11694 with
motorwork and reactive torque
PUW=37K PUH, RBIH to 11699, Stack with
motor work, PUH, Recip back to 11699. Recip
with sweeps, RBIH stack with motor work @
11703. PUH to 11651. Pump sweeps RBIH pass
11,700 to 11,800'
11,800 to 12,600 fairly clear Set down @ 12603.
Reip to TT
Word from town. Set anchor billet @ -12,190.
PUH and work hole 12,400 to TT with sweeps
BHA #6 Mill out 2.73" No Go
Reconfig BHA. M7U BHA#7 with OH anchor
billet. PD, M/U to coil and surface test. Stab on
well. Tag up and space out
inue in well, Close EDC @ 11638 Cle:
through window down to set depth @
I1.8 oriented to 10° ROHS
A depth and orientation. PU to 35K. Bi
ps online. See tool shift @ 5100 PSI. 1
n 5K on anchor
out after setting billet, PUW=39K, Op,
:in cased hole
up and space out, PUD BHA#7 billet:
Time Log & Summary Report AOGCC
1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/1612019
Rig Release :
Time Log
Stan Time
End Time
Dur
mr)
Swrt D)
(WB)
End DepiM1
(N(B)
Phese
Op Code
Activity Code
Operatbn
10/22/2019
10/22/2019
0.80
0.0
78.0
PROD?
STK
PULD
BHA #8 (NOV agiator, 0.5°, & RB C1)
22:00
22:48
10/22/2019
10/23/2019
1.20
78.0
6,100.0
PROD1
STK
TRIP
w/ BHA#8, shallow test agitator, dp = 1180
22:48
00:00
RTIRIH
i, good action at surface
10/23/2019
10/23/2019
0.90
6,100.0
11,100.0
PROD1
STK
TRIP
H w/BHA#8
00:00
00:54023/209
0/23/209
0.70
11,100.0
11,123.0
PROD?
STK
DLOG
g K1 for +13' correction
00:54
01:00
1023/2019
10/23/2019
1.20
11,123.0
12,189.4
PROD1
STK
TRIP
T
Contine RIH, PUW =39K @ window, re-boot BHI
01:00
02:12
direction software, unable to orient, trouble-
shoot, resolve issue, clean through window, dry
tag TOB at 12,191', bring on pumps, RBIH to mill
10/23/2019
1023/2019
0.80
12,189.5
12,190.5
PROD?
STK
KOST
T
FS = 1205 psi @ 1.9 bpm, begin milling on billet
0212
03:00
at 12,189.5', oriented 330" ROHS
1 ft/hr for 1 ft
CWT = 15.5K, WOB = 0.3K, pump = 5126 psi
10/23/2019
10/23/2019
12,190.5
12,191.5
PROM
STK
KOST
T
Go to 2 ft/hr for 1 ft
0300
03:30
1023/2019
10/23/2019
12,191.5
12,192.5
PROD1STK
KOST
T
Go to 3 ft/hr for 1 ft
03:30
0354
10/23/2019
10/23/2019
[0.40
12,192.5
12,202.0
PROD?
STK
KOST
T
Begin pushing on it, looking for WOB to gain
03:54
04:18
departure(10fph), CWT=13.1K,WOB=1.1K,
pump=5162psi, increaseto 15fph, wmeupto
20 fph, go to 30 fph, go to 60 fph, off billet
10/23/2019
1023/2019
12,202.0
12,290.0
PROM
DRILL
DRLG
T
Drilling, CWT= 12.2K, WOB = 1.3K, annular=
04:18
05:00
4210 psi, WHP = 233 psi, pump = 5258 psi,
pump 5x5 sweeps
1023/2019
10/23/2019
0.30
12,290.0
12,290.0
PROD1
DRILL
WPRT
T
PUW = 39K, dry drift billet area up & down, clean
05:00
05:18
10/23/2019
10/23/2019
3.00
12,290.0
12,465.0
PROD1
DRILL
DRLG
T
Drilling, FS = 1195 psi @ 1.9 bpm, CWT = 11.5K
05:18
08:18
@ 2.7K WOB, annular = 4216 psi, WHP = 196
psi, pump = 5534 psi, avg ROP = 58 fph
10232019
10/232019
3.20
72,465.0
12,590.0
PROM
DRILL
DRLG
T
Drilling, CWT = 9.4K @ 2.6K WOB, annular=
08:18
11:30
4222 psi, pump = 5441 psi, PUW = 39K from
12,521', avg ROP = 39 fph
1023/2019
10/23/2019
0.40
12,590.0
11,790.0
PROW
DRILL
DRLG
T
Wiper up-hale, PUW =40K
11:30
11:54
1023/2019
1023/2019
0.40
11,790.0
12,590.0
PROD1
DRILL
WPRT
T
Wiper in-hole, setdown 2.6K at 12,401', ratty
11:54
1218
through to 12,515', RIW = 11.5K
1023/2019
10/23/2019
3.20
12,590.0
12,849.0
PROD1
DRILL
DRLG
T
Drilling, FS = 1359 psi, CWT = 10.71K @ 3.2K,
12:18
1530
annular = 4227 psi, WHP = 167 psi, pump =
5535 psi, pump 5x5 sweeps as required, PUW =
43K from 12,849', avg ROP = 81 fph
1023/2019
10/23/2019
1.10
12,849.0
12,923.0
PROD1
DRILL
DRLG
T
Drilling CWT =9.SK@1.1K WOB, annular=
15:30
1636
4233 psi, WHP = 115 psi, pump = 5555 psi, avg
ROP = 67 fph
1023/2019
1023/2019
0.20
12,923.0
U,923.0
PROW
DRILL
WPRT
T
BHA wiper, PUW = 43K, grab missed survey
16:36
16:48
1023/2019
10/23/2019
1.40
12,923.0
13,010.0
PROM
DRILL
DRLG
T
Drilling, FS = 1350 psi @ 1.9 bpm, CWT = 11.5K
16:48
18:12
@ 1.25K WOB, annular = 4200 psi, pump =
5577 psi
10/23/2019
10/23/2019
0.70
13,010.0
11,668.0
PROD1
DRILL
WPRT
T
PU Wt41 klis, -dean, PUH slowlywaiting for
18:12
18:54
sweeps to exit the bit - chase sweeps up hole
on 2 nd wiper to the 7" @ 18:23. Slight neg
WOB drag until above 12,236'. No signifcat
overpulls, Billet and window clean.
Page 7114 Report Printed: 10/29/2019
�. Time Log & Summary Report AOGCC
1 R-23
. Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10116/2019
Rig Release:
Time Log
atertTme
End Tme
Dur
(hr)
Stan DepM
(flKB)
End Depth
(ftKB)
am
op Code
Acbvity Code
Tme P
-T-X
Operation
1023/2019
10/23/2019
0.70
11,668.0
11,644.0
PROD1
DRILL
CIRC
T
Pack off inthe 7", Bitdepth 11,641' flow rate out
dropped from 79 gpm to a low of 66 gpm. RBIH,
1854
1936
work pipe, regain returns. Send 5x5 sweep,
while joging 7", send second 5x5, significant
cutting at the shaker, no rocks. Chase bottoms
up.
• pullled through window @ 0.55 bpm and
10ft/min.B
10/23/2019
10/23/2019
0.30
11,644.0
71,092.0
PROD1
DRILL
CIRC
T
Attempt to RBIH on wiper trip. set down twice@
11,685' and 11,678'
19:36
1954
Pump 5x5 while PUH to tie in.
10/23/2019
10/23/2019
0.20
11,092.0
11,141.0
PROD1
DRILL
DLOG
T
Tie into the KI for a+l3'cerrection.
19:54
2006
10/23/2019
10/2312019
0.40
11,141.0
11,647.0
PROof
DRILL
CIRC
T
RBIH, attempt to pas window, set down@
2006
20:30
11,693'
PUH park and open EDC, launch 5x5 x2
1023/2019
1023/2019
0.60
11,647.0
11,608.0
PROD1
DRILL
CIRC
T
Chase sweeps to EDC while jogging
20:30
21:06
1023/2019
10/23/2019
2.00
11,608.0
71.0
PRODt
DRILL
TRIP
T
POOH chasing sweeps. Lots of cuttings and
aluminum billet in sweeps, jog hole at 500'.
21:06
2306
more aluminum at surface. Blew down MM and
chokes. Open, inspect and clean choke.
- 1 bbl of returns on the trip.
10/23/2019
10/23/2019
0.80
71.0
0.0
PROD1
DRILL
PULD
T
PUD BHA Bit balled p, packed with clay and some small
23:06
23:54
rocks, two plugged noules.
plugged
10/23/2019
10/24/2019
0.10
0.0
0.0
PROD1
DRILL
BOPS
T
Function test BOPE
23:54
00:00
1024/2019
10/24/2019
0.20
0.0
0.0
PROD1
DRILL
BOPE
T
Function test BOPE
00:00
00:12
10/24/2019
10/24/2019
0.90
0.0
71.9
PROD1
DRILL
PULD
T
PD BHA#9, cleanout assembly, 0.5° AKO motor
00:12
01:06
w D331 ridgeset bit.
1024/2019
10/24/2019
1.90
71.9
11,100.0
PROD1
DRILL
TRIP
T
RIH
01:06
03:00
1024/2019
10/24/2019
0.10
11,100.0
11,130.7
PRODt
DRILL
DLOG
T
Tieintothe Ktfor+l1'
03:00
03:06
1024/2019
10/24/2019
0.30
11,130.7
11,693.0
PROD1
DRILL
DLOG
T
Close EDC, continue to RIH, PU Wt @ 11,647'
03:06
0324
38 k lbs.
Stage two sweeps
1024/2019
10/24/2019
0.30
11,693.0
11,716.0
PROW
DRILL
WASH
T
CT 4599 psi @ 1.9 bpm in/out, free sping diff
560 psi, BHP 4143 psi, WH 160 psi, IA 489 psi,
03'24
03:42
OA 0 psi. CT Wt 12 k lbs.
Work down hole, slight motor work and WOB @
11,699'. WOB increased to 3 k lbs with motor
work @ 11,714', broke back then increased
again by 11,716'
1024/2019
10/24/2019
2.50
11,716.0
11,680.0
PROD1
DRILL
WASH
T
PU Wt 38 k lbs, PUH, start dragging, WOB to -7
k lbs @ 11,703', 5 k overpull on CT Wt, packing
03:42
06:12
off, work pipe, regain returns, pull to casing.
RBIH to 11,720', some motor work & WOB. PU,
39 k lbs. Pull to casing, clean. Continue to
Clean out taking 10' bites to 11,780', ciruculate
bottoms up, dry drift window, full rate down to
11,780', clean
1024/2019
10/24/2019
2.70
11,680.0
72.0
PROD1
DRILL
WPRT
T
Open EDC, pump 10x10 sweeps @ 2 bpm,
06:12
08:54
POOH, PJSM
1024/2019
10/242019
0.80
72.0
0.0
PRODt
DRILL
PULD
T
PUD BHA#9, mill came out 2.73" no-go
08:54
09:42
10/24/2019
10/24/2019
1.20
0.0
78.0
PROD?
DRILL
PULD
T
PD BHA#10 Drilling Assemlby (NOV Agitator,
0.5° AKO motor, & C1 bit), slide in cart, check
09:42
10:54
pack -offs, MU to coil, tag up, set counters
1024201910/24/2019
2.00
78.0
11,100.0
PROD1
DRILL
TRIP
T
RIH w/BHA#10, shallow test, dp=1300 psi,
1
pump = 4910 psi, good
1054
1254
Page 8114 Report Printed: 10/292019
Time Log & Summary Report AOGCC
t 1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept : 10/16/2019
Rig Release:
Time Log
Dur
SIM Depth
(N-'
EM Depth
(WEI)
Phase
Op Cade
Time
Aovdy Code
P
-T-X
Operation
Star ime
10/24/2019 10/24/2019
End Time
(hr)
0.10
11,100.0
11,131.0
PROW
DRILL
DLOG
T Log
K1 for 11.5', PUW = 35K
12:54 13:00
10/24/2019
10/24/2019
0.70
11,131.0
13,010.0
TR
DRILL
TRIP
T
through
Continue RIH, stack at 11,682', PU &get right
window clean, begin sending new mud
13:00
1342
(system
#3), stack weight at 12,385', stack again
at same depth, PU & work through at 0.8 bpm &
25 fpm, stack at 12,434' (PUW = 47K)
Bore pressuring up, 1 -for -1 returns (likely
plugged nozzles), begin pulling -14K WOB,
—12,420', can orient (slight amperage increase),
free pipe pulling to 70K, pump sweeps
1024/2019
10/24/2019
0.70
13,010.0
11,642.0
PRODi
DRILL
DRLG
T
bipm @ BO fpm) 9 build, 7 puImp sweeps, ps,, c rcula egh window 5
1342
14:24
bottoms up (w/ new mud)
10/24/2019
10/24/2019
0.90
11,642.0
12,385.0
PRODi
DRILL
TRIP
T
RBcirculat tt—ackat 11,679', roll sweeps to surfaceb'cleancth ou gh ain (3X),
1424
15:18
window, clean past billet,
10/24/2019
10/24/2019
1.20
12,385.0
12,440.0
PROD,
DRILL
TRIP
T
b, stacked at 12,385',
Continue RIH in 1bites,
work down taking bites, work to 12,396',
15:18
16:30
clean, RBIH, work to 12,416', PU, begin seeing
weight at 12,396', losing hole, appears to be
caving, continue working down to 12,420', PUW
= 43K, 5K overpull at 12,386, begin seeing
weight at 12,403', work to 12,445', PU,
workf'drill" to get back to 12,445', work to
12,469'
10/24/2019
10/24/2019
1.90
12,440.0
11,631.0
PROD?
DRILL
TRIP
T
Become detained at 12,440', full returns, pull to
70K (-13K WOB), work pipe free, pump sweeps,
16:30
18:24
pull to BOW, jog build until full bottoms up of
sweeps, pull through window at 0.5 bpm @ 10
fpm, jog 7" pumping sweeps, chase bottoms up.
10/24/2019
10/2412019
0.20
11,631.0
11,673.0
PROD,
DRILL
TRIP
T
RIH, attempt to dry drift window @ 20 ft/min, SD
@ 11,683', PU 43 k lbs. PU, RBIH and pass
18:24
18:36
window cleanly. WOB spike to 2 k @ 11,702',
fell off continued on in hole to 11,760' EOB.
PUH through window -dean.
1024/2019
2.30
11,673.0
61.7
PROD1
DRILL
TRIP
T
POOH spinning the bit, 1.9 bpm in and 1.45 bpm
10/24/2019
out. jog the tubing at 500'.
18:36
24
10/2019
20:54
10/24/2019
1.40
61.7
0.0
PRODt
DRILL
PULD
T
Bump
UmosNAff hu.
it amup, e o sut pace
reamers sheared
20:54
22:18
off.
1024/2019
10/24/2019
1.10
0.0
72.9
PROD1
STK
PULD
T
PD BHA#11, open hole anchored billet
2218
1024/2019
23:24
10/25/2019
0. 60
72.9
—-§TK
2,757.0
PROD1
TRIP
T
RIH w billet.
2324
1025/2019
00:00
10/25/2019
1.20
2,757.0
11,113.0
PROD,
STK
TRIP
T
RIH w billet.
00:00
10/25/2019
01:12
10/25/2019
0.20
11,113.0
11,146.6
DI
STK
DLOG
T
Tie into the Kt marker fora 14' correction.
01:12
01:24
12,141.8
PRODt
STK
WPST
T
ContinuePark
1025/2019
1025/2019
1.00
11,146.6
n cased hole abovve window, close EDG.
01:24
02:24
Attempt to RIH, S/D @ 11,709, 5 k WOB 45k
PU, repeat 5 times, PU's ranged from 40 to 47 k
lbs. saw -2.6 k WOB on one attempt. Rolled
TF to various orientations after second stack.
After 6 th attempt, RIH to 12,141.8'. Orient TF to
210° ROHS, PU to neutral weight online with the
pump. Saw shear @ 4800 psi, WOB climbed to
1.4 k, set down to 4.3 k Itis - good set
PU Wt 43 k Ibs.
102512019
10/25/2019
0.30
12,141.8
11,499.0
PR0D1
STK
TRIP
T
PUH to cased hole.
02:24
02:42
Page 9114 Report Printed: 1012912019
Time Log & Summary Report AOGCC
1 R-23
. Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/16/2019
Rig Release :
Time Log
Start Tim
End i�me
Dur
(hr)
Start B)
(ftKB)
Eno B)
(MB)
Phase
Op Code
Activily Code
Tme P
-T-%
Operation
10/25/2019
10/25/2019
0.60
12,141.8
11,499.0
PROD1
STK
CTOP
T
Park and inspect fluid on off reel side right angle
02:42
03:18
drive.
10/25/2019
10/25/2019
1.90
11,499.0
72.0
PROW
STK
TRIP
T
Continue out of hole, PJSM
03:18
05:12
10/25/2019
10/25/2019
1.20
72.0
0.0
PROD1
STK
PULD
T
PUD BHA 1, crew change
05:12
06:24
1025/2019
10/25/2019
1.10
0.0
78.0
PROD1
STK
PULD
T
PD BHA #12, slide in cart, change out pack -offs,
06:24
0730
MU to coil, tag up, set counters
10/25/2019
10/25/2019
0.10
78.0
78.0
PROD?
STK
TRIP
T
RIH w/ BHA #12, pump pressure climbing, bore
07:30
07:36
notclimbing
1025/2019
10/25/2019
0.40
78.0
78.0
PROW
STK
PULD
T
Bleed off pump, Pop off, open DBV, stab back
07:36
08:00
on, complete PD
1025/2019
1025/2019
2.00
78.0
11,100.0
PROW
T
RIH w/ BHA #12, shallow test tools, 1.9 bpm,
08:00
10:00
pump = 4800 psi, dip = 1092 psi
1025/2019
1025/2019
0.10
11,100.0
11,119.0
PRODi
DLOG
T
Log K1 for +21'
10:00
10:06
10/25/2019
10/25/2019
0.60
11,119.0
12,130.4
PROD1
rTKTRIP
TRIP
T
Continue RIH, PUW @ window = 37K, clean
1006
10:42
through window, dry tag TOB @ 12,132', PUW =
41 K, bring up pumps
1025/2019
10/25/2019
2.30
12,130.4
12,131.0
PROD1
KOST
T
Milling at 12,130.4', FS = 1021 psi @ 1.9 bpm,
10:42
13:00
pump = 4906 psi,
1 Whir for 1 fl
Stall at 12131.3', PUW = 42K, stall again at
12,131.24', stall at 12131.0, observe CWT climb
while time milling, difficulty getting restarted,
stick slipping, work down in 1/10's to find weight
and get restarted, add additonal 1% 776 to
system, creep down to 12,131.04' and go into
stall
10/25/2019
10/25/2019
0.80
12,131.0
12,130.6
PRODi
STK
KOST
7
Continue attempting to get started, awaiting
13:00
1348
addition of lubes in system, stall again at
12,131.04', wiper up to BOW, awaiting lubed
mud to bit, RBIH
1025/2019
1025/2019
0.80
12,130.6
12,131.4
PRODII
STK
KOST
T
With lube all the way around, put in auto driller at
13:48
14:36
1 ft/hr at 12,130.6'
10/25/2019
10/25/2019
0.50
12,131.4
12,132.4
PROD1
STK
KOST
T
Go to 2 Whir for 1 R
14:36
15:06
1025/2019
10/25/2019
0.30
12,132.4
12,133.4
PROD1
STK
KOST
T
Go to 3 ft/hr for 1ft
15:06
15:24
10/25/2019
10/25/2019
0.30
1,233.4
12,140.0
PRODi
STK
KOST
T
Go to 10 ft/hr, go to 20 fUhr
15:24
15:42
10/252019
10/25/2019
2.20
12,140.0
12,221.0
PROD1
DRILL
DRLG
T
Off billet, drilling ahead, pump 5x5 sweeps
15:42
17:54
Unload ODS PDL
10/25/2019
10/25/2019
0.10
12,221.0
12,221.0
PRODt
DRILL
WPRT
T
Dry drift billet up & down, clean
17:54
18:00
1025/2019
10/25/2019
1.50
12,221.0
12,271.0
PROD1
DRILL
DRLG
T
CT 5310 psi @ 1.9 bpm in and out, FS 1127 psi,
18:00
19:30
BHP 4189 psi - targeting 11.8 @ the window, CT
Wt 11.5 k lbs, WOB variable to 3 k lbs.
10/25/2019
10/25/2019
1.50
12,271.0
11,695.0
PRODi
DRILL
WPST
T
PU on wiper#1, PU Wt42 k lbs.
19:30
21:00
Decision made to come all the way to the 7" post
billet sidetrack.
Jog the build with sweeps timed out in build and
fight before exiting the window.
Jog 7" and chase up hole with sweeps
RBIH
1025/2019
10252019
0.10
11,695.0
11,728.0
PROD1
DRILL
DLOG
I T
Tie into the RA tag for +5.5' correction
21:00
21:06
10/25/2019
10/25/2019
0.40
11,728.0
12,271.0
PROD1
DRILL
WPRT
T
RBIH post wiper to window
21:06
21:30
Page 10114 Report Printed: 10/2912019
Time Log & Summary Report AOGCC
IR -23
. Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept : 10/16/2019
Rig Release
Time Log
StarlTme
End Time
our
On
Start Depth
(ftKa)
Em! Depth
Me)
Mase
Op Code
AdiAy Code
Time P
-T-X
Operation
10/25/2019
10/25/2019
1.10
12,271.0
12,371.0
FROM
DRILL
DRLG
T
CT 5450 psi @ 1.90 bpm in&out, Free spin 956
21:30
22:36
psi, BHP 4202 psi, OBD, WOB to 3 k lbs,
Average ROP over interval 90 R/hr
10/25/2019
10/25/2019
0.20
12,371.0
12,371.0
FROM
DRILL
WPRT
T
PU on first short wiper 214'staying below the
22:36
22:48
billet, PU Wt 43 k lbs -
RBIH
10/25/2019
10/25/2019
0.60
12,371.0
12,494.0
PRODi
DRILL
DRLG
T
CT 5450 psi @ 1.90 bpm in&out, Free spin 956
2248
23:24
psi, BHP 4202 psi, OBD, WOB to 3 k lbs,
PU - 12,443' to roll TF - 41 k lbs
Average ROP over interval 205 ft/hr
10/25/2019
10/26/2019
0.60
12,494.0
11,713.0
FROM
DRILL
WPST
T
PU on wiper#2- long wiper to window PU Wt 42
23:24
00:00
k lbs.
10/26/2019
10/26/2019
0.70
11,713.0
11,699.0
FROM
DRILL
WPRT
T
Continue up hole on long wiper to the window
00:00
0042
Jog the build with sweeps timed out in build and
fight before exiting the window.
Jog 7" and chase up hole with sweeps
RBIH
10/26/2019
10/26/2019
0.10
11,699.0
11,733.0
PROD1
DRILL
DLOG
T
Tie into the RA tag for+3'correction
0042
00:48
10/26/2019
10/26/2019
0.30
11,733.0
12,494.0
FROM
DRILL
WPRT
T
RBIH post wiper to window
00:48
01 06
10/26/2019
10/26/2019
2.10
12,494.0
12,632.0
PROD1
DRILL
DRLG
T
CT 5499 psi @ 1.90 bpm in & out, Free spin
01:06
03:12
1
1042 psi, BHP 4210 psi, OBD, WOB to 3 k lbs,
10/26/2019
10/26/2019
0.40
12,632.0
12,632.0
PROD1
DRILL
WPRT
T
PU on first short wiper 460' staying below the
03:12
0336
billet, PU Wt 41 k lbs - RBIH
10/26/2019
10/26/2019
2.40
12,632.0
12,695.0
PROD1
DRILL
DRLG
T
CT 5649 psi @ 1.90 bpm in & out, Free spin
03:36
06:00
1183 psi, BHP 4232 psi, WH 67 psi, IA611 psi,
OA 8 psi, OBD, CT Wt 9.6 k lbs WOB to 2.2 k
lbs
10/26/2019
1026/2019
1.50
12,695.0
12,753.0
PROD1
DRILL
DRLG
T
Drilling, CWT= 7K @ 2.8K WOB, annular=
06:00
07:30
4257 psi, WHP = 70 psi, pump = 5848 psi,
significant clay over shakers, pump 2x2 sweeps
10262019
1026/2019
1.10
12,753.0
11,700.0
PROD1
DRILL
WPRT
T
Wiper to tubing tail, PUW = 40K, pump 5x5
07:30
08:36
sweeps, jog build, stack weight at 11,716', pull
through window, jog 7", jet XN nipple
Stack at 11,688'(5.7K WOB), PUW = 45K,
through window clean at 30 fpm
1026/2019
10/26/2019
0.10
11,782.0
11,728.0
FROM
DRILL
DLOG
T
Log RA tag for+5' correction
08:36
0842
j
1026/2019
10/26/2019
0.50
11,728.0
12,753.0
PROW
DRILL
WPRT
T
Wiper in-hole, weight bobbles at beginning at
08:42
09:12
-12,730', RIW = 10K
1026/2019
10/262019
1.00
12,753.0
12,850.0
PROD1
DRILL
DRLG
T
Drilling, FS= 1150 psi @ 1.9 bpm, CWT = 101<2
09:12
10:12
1.4K WOB, annular=4249 pis, WHP = 18 psi,
pump= 5784 psi, difficulty dropping Inc, lower to
1.75 bpm per DD request, avg ROP = 97 fph
10/26/2019
10/26/2019
0.40
12,850.0
12,850.0
PROD1
DRILL
WPRT
T
400'wiper up -hole, PUW= 38K, stack weight at
10:12
10:36
1
-12,650'-12,675'. RIW = 10.8K
10/26/2019
10/26/2019
2.20
12,850.0
12,950.0
FROM
DRILL
DRLG
T
Drilling, FS = 940 psi @ 1.7 bpm (rate to aid in
1036
12:48
dropping inclination), CWT = 9.8K @ 1.2 WOB,
annular= 4274 psi, WHP = 53 psi, pump = 5187
psi, ROP slows, avg ROP = 45 fph, pump 2x2
sweeps
1026/2019
1026/2019
1.10
12,950.0
11,700.0
PROD1
DRILL
WPRT
T
Wiper to tubing tail, PUW = 40K, 2x2 timed for
12:48
13:54
EOB, small tug pulling past billet, WOB tug at
11,754', partial pack -off (minor), turn around &
stack 12,708', PU, stack at 12,715' (pass 12,715'
at 5 fpm), dean through window, jet XN nipple,
stack at 11,688' (2X),
10/26/2019
10262019
0.10
11,700.0
11,723.0
FROM
DRILL
DLOG
T
Log RA for +5' correction
1354
1400
1
Page 11114 Report Printed: 10/29/2019
r Time Log & Summary Report AOGCC
1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 1011612019
Rig Release:
Time Log
Start Tme
End Tone
Dur
(ho
Start Depth
("ka)
EMKB)
(flKe)
Phase
Op Code
T.—.p
AcfiR Cede
T
-T-X
Operation
at 12,660'
10/26/2019 10126/2019
0.60
11,723.0
12,950.0 PROW
DRILL
WPRT
per own gpvr eology), get by at -1 bpm ak t 15-30
14:00 14:36
fpm,
RIW = 9.9K
10-26/2019 10/26/2019
1.20
—12,950.0 --T3-0-51,.0
PROD1
DRILL
DRLG T
D@ril1 K W0B� anOnulars=@4268 psi, WHP = 15 psi,
14:36 15:48
pump = 5805 psi
10/26/2019
10/26/2019
0.40
13,051.0
—T-3-051,.0
PROD'
DRILL
WPRT
T
12boto
pmUW
a@P25 fph from 112,6805'_ RBIOOg stack
15:48
16:12
weight at 12,738', PUW = 39, RIW = 10.5K
10/26/2019
10/26/2019
1.30
13,051.0
—T3—,151.0
PROD1
DRILL
DRLG
T
D@ri10.9K WOB,I144 ps, annular=4308 psi, pump = 6865
16:12
17:30
psi
10/26/2019
10/26/2019
-140
13,151.0
11,700.0
PROD,
DRILL
WPRT
T
Wiper[tottubinwn doiµPUW=39wiper. PUH on long
1730
18:54
Draggy section from 12,697 - 12,297' -0.3 to -.8
k lbs WOB w/motor work.
Pulled 15 k lbs over CT Wt w neg WOB and
packed off @ 11,758' Worked pipe 4 times
Worked free, returns returned, RBIH to 11,811'
PUH, -1k WOB tug @ 11,678'
Jet 7" pump 2x2 sweep. RBIH - dean.
10/26/2019
10/26/2019
0.10
11,700.0
11,723.0
PROD1
DRILL
DLOG
T
Tie int the RA tag for a+5.5'
18:54
10726/2019
19:00V.
10/26/2019
0.80
11,723.0
13,151.0
PRO01
DRILL
WPRT
T
Q, IH per
dtowntPUo wiWt43 k lbs, -2.5 k WOB
19:00
19:48
12,664' WOB to 1.5k lbs
12,757' WOB to 1.2 k lbs
12,875' WOB to 3 K set down, PU Wt 38 k lbs,
cut pump to 1.66 bpm -07 k WOB
Continue in hole
10psi
/26/2019
1012612019
1.80
13,151.0
13,252.0
PRODt
DRILL
DRLG
T
gHP 4314Tt 5834 sps@ targeting 11 Tll�urT Not@ he window,
19:48
21:36
currently 12.36 ppg @ the bit. WH 78 psi - open
choke, IA 661 psi, OA psi. Ct 10 k falling to 0
over drilled interval. WOB 1.5 k lbs.
10/2 6/2019
10/26/2019
1. 00
13,252.0
13,252.0
PROD1
DRILL
WPRT
on short -'Per #1
PUH to 12,843'-400'
21:36
22:36
RBIH, pull short jog/geo wiper to discuss
planfonvard for invert, RBIH
10726/20,9
10/27/2019
140
—73—,252.0
13,340.0
PRODt
DRILL
DRLG
fT
Psi, BHP 4335 psi bCrt W[ auk Ibs�WOB 113871bs.
2236
10/27/2019
00:00
10/27/2019
0.20
13,340.0
13,350.0
PRODt
DRILL
DRLG
Continue to drill ahead.
00:00
00:12
10/27/2019
1.60
13,350.0
11,700.0
PROD,
DRILL
WPRTwindow.4
klbs, PUH on long wiper to the
10/27/2019
00:12
01:48
WOB to -3.3 k lbs tug at 12,626'
Time first sweep to exit @ 11,800'. Pull to
11,760' while sweep exits, RBIH to 12,000'.
PUH cutting speed @ 11,740' letting sweep exit.
@ 11,720' cut pump to 0.55 bpm and pull @ 5
ft/min through window in to 7"
-1k WOB lug @ 11,678 while pulling past the
window
Jet 7" chase bottoms up. RBIH @ 30 ft/min
through window
5 ft/min once in open hole. 3K WOB spike @
11,685'
1027/2019
10!27/2019
0.10
11,700.0
11,736.0
PR OD1
DRILL
DL L.
T
Tie int the RA tag for a +7'
01:48
01:54
Page 112114 Report Printed: 10/29/2019
Time Log & Summary Report AOGCC
1 R-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept: 10/1612019
Rig Release
Time Log
Our
Start Depth
End Depth
Time P
Start Tme
End rime
Mo
(ftK8)
(ftKe)
Phase
Op Code
A6vdy Code
-TX
Operabon
10/27/2019
10/27/2019
0.80
11,736.0
13,352.0
PROW
DRILL
WPRT
T
RBIH post wiper to window.
01:54
02:42
12,900' S/D w 2 k WOB, PU 41 k Ibs
13,157' S/D w 2.3 k WOB, PU 42 k Ibs
13,238' SID 3 times, PU up to 46 k lbs, PUH,
RBIH, cut rate to 0.5 bpm, 30 ft/min.
Walk rate up after 13,250 Continue to RIH
10/27/2019
10/27/2019
1.80
13,352.0
13,461.0
FROM
DRILL
DRLG
T
Ct 5930 psi, @ 1.9 bpm in/out. FS 1148 psi,
02:42
04:30
BHP 4360 psi - targeting 11.8 @ the window,
currently 12.56 ppg @ the bit. WH 16 psi - open
choke, IA 648 psi, OA 8 psi. CT RIH WT 9 k,
OBD 2.5 k lbs, WOB 1.25 k lbs.
10/27/2019
10/27/2019
0.40
13,461.0
13,461.0
FROM
DRILL
WPRT
T
PU Wt 39 k lbs, PUH on short wiper#1 PUH to
04:30
04:54
13,060' -400' RBIH
Set down @ 13,156'- PU proactively cut rate
from 1.9 to 1.56
Continue to RIH @ 40 ft/min
10/27/2019
10/27/2019
2.00
13,461.0
13,560.0
PROD?
DRILL
DRLG
T
CT 5935 psi, 1.89 bpm in/out. Free spin 1111
04:54
06:54
psi, BHP 4338 psi. Ct Wt 6 k lbs, WOB 1.3 k
lbs., pumps 2x2 sweeps
10/27/2019
10/27/2019
1.30
13,560.0
11,700.0
FROM
DRILL
WPRT
T
Wiper to tubing tail, PUW = 42K, pump sweeps
06:54
08:12
for EDB, WOB tug -12,660% clean past billet, jog
build, small tug through window, jog 7". RBIH
through window, setdown at 11,688', roll bit,
stack again at 11,683', again at 11,678'(3X),
change TF, get through at 5 fpm
10/27/2019
10/27/2019
0.10
11,700.0
11,718.0
PROD1
DRILL
DLOG
T
Log RA for+Tcorrecdon
08:12
08:18
10/27/2019
1027/2019
1.10
11,718.0
13,560.0
PROM
DRILL
WPRT
T
Wiper in-hole, clean past billet, reduce rate &
08:18
0924
speed beginng 12,615', ratty 13,126' to 13,300',
RI W = 4K
1027/2019
10/27/2019
1.90
13,560.0
13,660.0
PROD-
DRILL
DRLG
T
FS = 1088 psi @ 1.9 bpm, CWT = 5.4K @ 0.8K
09:24
-1:18
WOB, annular = 4400 psi, pump = 5924 psi,
choke wide open, begin pumping mud system
#4, at the bit 13,592', avg ROP = 53 fph
1027/2019
10/27/2019
0.70
13,660.0
13,660.0
FROM
DRILL
WPRT
T
400' wiper, PUW = 42K, stacking at 13,544'-
11:18
12:00
1
1
13,589', RIW = 6K
1027/2019
10/272019
2.00
13,660.0
13,760.0
FROM
DRILL
DRLG
T
Drilling, FS = 1038 psi @ 1.9 bpm, CWT =4.3K
1200
1400
@ 1.2K WOB, annular =4291 psi, WHIP =92
psi, pump = 5418 psi, avg ROP = 50 fph
10/272019
10/27/2019
2.40
13,760.0
11,100.0
PROD1
DRILL
WPRT
T
Wiper to tubing tail, PUW = 44K, pulled heavy at
1400
16:24
12,700' & 12,626', jog build
Pull heavy at 11,736, RBIH, stack weight,
pressuring up annular, parital pack -off (have
returns), can orient, pump 5x5 sweeps, work
pipe, pop free working down, RBIH, jogging
awaiting sweeps, stack on billet, run through to
verify clean, sweeps well up -hole, pull through
window (0.5 bpm @ 5 fpm), jog 7", jet XN nipple,
difficulty working through window (5 set -downs)
1027/2019
10/272019
0.20
11,100.0
11,136.0
PROD1
DRILL
DLOG
T
PUH & log K1 for+9.5'
16:24
16:36
10/27/2019
1027/2019
0.50
11,136.0
11,688.0
PROM
DRILL
WPRT
T
RBIH, stack at 11,688', orient TF 10"R of milled,
16:36
17:06
attempt rolling TF with WOB, no good, pull up to
35K (1.3 WOB), roll TF to "pop" through, no
good, attempt again at 30 fpm, no good, PU
pump for a bit in 7", attempt 20°L at 35 fpm
1027/2019
10/27/2019
2.60
11,688.0
72.0
PRODI
DRILL
TRIP
T
PUW = 42K.. pumps 5x5 sweeps, circulate
17:06
19:42
bottoms up
POOH chasing sweeps to surface on wiper trip.
Found some small savings in the returns on the
wiper trip, first rocks to surface, Geo says B
formation.
Page 13114 ReportPrinted: 10/2912019
Time Log & Summary Report AOGCC
IR-23
Well Name: 1R-23 Rig Name: NABORS CDR3-AC
Job type: DRILLING SIDETRACK Rig Accept : 10/1612019
Rig Release
Time Log
Stah Time
End Time
our
(hr)
Start Depth
(111(8)
End Depth
(111(e)
Phase
Op cod.
AchOy Code
Time P
-T-%
Operahon
10/27/2019
10/27/2019
1.00
72.0
0.0
PROD?
DRILL
PULD
T
Bump up, PUD BHA# 12
19:42
2042
Bit clean, no day, all nozzles clear, one chipped
reamer.
10/27/2019
10/27/2019
1.30
0.0
62.0
PROD1
DRILL
PULD
T
PD BHA#13 D331 dean out assembly, sans
2042
22:00
resistivity and agitator.
Inspect pack off - good
10/27/2019
10/28/2019
2.00
62.0
10,645.0
PRODi
DRILL
TRIP
T
Bump up, set counters, RIH
22:00
0000
10/28/2019
10/28/2019
0.10
10,645.0
11,105.0
PROD1
DRILL
TRIP
T
Bump up, set counters, RIH
00:00
00:06
1028/2019
10/28/2019
0.10
11,105.0
11,126.0
PROD?
DRILL
DLOG
T
Tie into the K1 for+11' correction.
00:06
0012
1028/2019
10/28/2019
0.30
11,126.0
11,672.0
PROD1
DRILL
TRIP
T
Close EDC, continue in hole.
00:12
0030
Call from Geo / MWD- mistake on tie in, Pick up.
add additional +10 feet to depth
1028/2019
10/28/2019
0.70
11,126.0
11,688.0
PROM
DRILL
WASH
T
RIH pumping 1.86 bpm FS 453 psi, Starttaking
00:30
01:12
weight 11,684' slight moto work, sharp increase
in WOB ( 1.1k) @ 11,687.5 WOB limbed to
4.5k tool face torqued up. Down on the pump
PU 40 k lbs, dean.
RBIH @ 1.8 bpm @ ift/min, same results PU Wt
37k.
RBIH, creep forward from 11,687, WOB clamed
to 2.8 k lbs, park, WOB increased to 4 k stalled.
1028/2019
10/28/2019
0.70
11,688.0
11,688.0
PROD1
DRILL
TRIP
T
PUH while consulting w town.
01:12
01:54
1028/2019
10/28/2019
0.60
11,688.0
11,711.0
PROD1
DRILL
WASH
T
RIH 5 times unsucessfully
01:54
02:30
0.5 bpm - 25 ft/min
0.5 bpm - 30 ft/min
0.35 bpm - 18 ft/min
1.2 bpm - 15 ft/min
1.4 bpm - 30 ft/min
RIH to 11,687.2' at 1.90 bpm, just shy of
obstruction, PUH washing @ 1.90 bpm to
11,660'
RIH pumps off, - pass window cleanly. Start
seeing WOB @ 11,711' PUH
10/28/2019
10/28/2019
0.40
11,711.0
11,624.0
PROM
DRILL
WASH
T
Attempt to pull into casing, stuck and packed off
0230
02:54
@ 11,624'
Work pipe, regain circulation, pull free
10/28/2019
10/28/2019
0.20
11,624.0
11,711.0
PROD1
DRILL
WASH
T
RBIH pumping 1.8 S/D at 11,188'. PU cut pump
02:54
03:06
pas through window clean-
Ramp pump rate to 1.8 and RIH to 11,711'
10/28/2019
10/28/2019
1.10
11,711.0
11,650.0
PROM
DRILL
WASH
T
Attempt to PUH. Packed off and became stuck.
03:06
0412
getting 1.2 bpm returns for 1.80 bpm in.
Worked pipe from 11,701-11,699
Ct Wt to 46 k, WOB to -5 k, returns increased,
worked pipe, domped choke, no luck, returns
diminished.
Consult with town, HOT rotating freely, returns
stedy at 1.6 bpm
Work pipe to 80 k three times. Returns regained
as pipe started to move on third try.
Pulled free.
1028/2019
10/28/2019
11,650.0
78.0
PROM
DRILL
TRIP
T
PUH chasing sweeps on swab wiper
04:12
04:12
1
I
I
1028/2019
10/28/2019
78.0
PROD1
PUD BHA#13
04:12
04:12
Page 14/14 Report Printed: 10/29/2019
OW m zL a lalos mgouµHO
aW 880'6L � al
tBdLIEZ-at
aW DEUR @ 1�11!81oV3uy-HO
aW .oWa �D al
ZedOCZ-at
aW ,oeL'EL 0 al
e9dtiEz-at
OW ,609' L L le SOS z/ L-£
(00-oN 'OI ulw „9L'Z) OW 969'L L le alddiu-NX SILO
(OI „69'Z) OW d99' L L le japed SH 184BO
OW .999' L L le'd8d ,.Z/L-£ J94BO
(OI .,£L9'Z) OW ,0£9' L L @ alddiu 6wpuel mllooleS X SIlO
594' L L le laipuew Im se6 Suo .,Z/ L-£
. L9Z£ le lwpuew N se6 oowe0 ,.Z/L-£
ooepns of 6ulgnl PJ9 3n3 99-f #£'6 „Z/L-£
OW .9M le ASSS W-d021100weO Z/L-E
ollewo4a5 alo juwlno EZ -H1
OW.9LL'U
aoys 09-1 #9Z ..L
OW ,OLLI L -.O LL' L L
sped pues-O
OW,LE£9
aoys 99-f #9£ „9/S-6
OW .EZ L loi
aoys Ob -H #Z9 ..9 L
Loepp, Victoria T (CED)
From:
Loepp, Victoria T (CED)
Sent:
Tuesday, October 29, 2019 10:18 AM
To:
McLaughlin, Ryan
Cc:
Ohlinger, James J
Subject:
KRU 1 R-231-11(PTD219-128) Operations Shutdown Request
Ryan,
Verbal approval is granted for the Operations Shutdown for CRD3-AC for KRU 1R-23L1(PTD 219-128).
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria LoeppCd)alaska.00v
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)7931247 or victoria Loeou'aalaska.aov
From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Sent: Tuesday, October 29, 2019 10:13 AM
To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Cc: Ohlinger, James J<James.J.OhIinger@conocophi IIips.com>
Subject: 111-23 (PTD 191-101) Operations Shutdown Request
Hello Victoria
On October 16th CDR3-AC rigged up to drill a tri -lateral project on 1R-23. After 3 unsuccessful attempts at drilling the
111-231-1 lateral, primarily due to hole cleaning issues in the 7" production casing, the decision was made to rig down
CDR3-AC from 1R-23 and set the well up for a cement pilot hole exit for the rig to come back at a later date and
complete the scope of the project under the approved PTD.
In preparation for resuming CTD operations on this well, perforations will be shot in the tubing tail, cement will be
pumped to occupy the 7" casing and plug off C -sand perforations, and the XN nipple in the tubing tail will be milled out.
CDR3-AC will mill a cement pilot hole, set a 3-1/2" whipstock, and mill a 2.80" window in the production casing at a
depth of 11,662' MD and complete the original scope of the project under the existing permits.
We are requesting verbal approval for an Operations Shutdown with the Sundry to be submitted today. We will also
submit a subsequent sundry request for cement -squeezing the C -sand perforations and setting a new whipstock prior to
beginning the service coil work.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
Loepp, Victoria T (CED)
From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Sent: Tuesday, October 29, 2019 10:14 AM
To: Loepp, Victoria T (CED)
Cc: Ohlinger, James J
Subject: RE: [EXTERNAL]KRU 1R-23(PTD 191-101); KRU 1R-23L1(PTD 219-128) Operations
Shutdown
Follow Up Flag: Follow up
Flag Status: Flagged
Hello Victoria,
I have sent a request for verbal approval for Operations Shutdown in a separate email. We plan on resuming drilling in
December which should fall within the 60 days period.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Sent: Tuesday, October 29, 2019 9:57 AM
To: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Cc: Ohlinger, lames J <James.J.Ohlinger@conocophi IIips.com>
Subject: [EXTERNAL]KRU 1R-23(PTD 191-101); KRU 1R-23L1(PTD 219-128) Operations Shutdown
Ryan,
KRU 11-10(201-071) CTD drilling interruption was different. Only +100' out of the window was drilled. In addition, KRU
11-10 motherbore was planned to be put back on production. For KRU 1R-23L1(PTD 219-128), three plugbacks —1000-
3000' MD per lateral were drilled. These drilling records should be captured under KRU 1R-23L1(PTD 219-128). This is an
Operations Shutdown under this PTD. Please submit a 10-403 Sundry for Operations Shutdown approval(20 AAC
25.072(a)). Will drilling be resumed within 60 days? The AOGCC should be notified for verbal approval for an Operations
Shutdown with the Sundry to follow imminently.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil 8 Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria Loeoo(aalaska.gov
1 R-23 Current CTD Schematic
18" 62# H-40 shoe
123' MD
9.5/8" 36# J-55 shoe
6331' MD
KOP C 11,682' MD
va7"HEW
C -sand parts
11,71(Y-1 770'MD
7" 26# L-80 Shoe
12,178' MD
3.112 Camco TRDP-1A SSSV at 1816' MD
3.1/2" 9.3#J-55 EUE 8rd Tubing to surface
3111" Camco gas lift mandrel at 3251'
3.1/2" OTIS gas lift mandrel at 11,485'
OTIS X Selective landing nipple @ 11,530' MD (2.813" ID)
Baker 31/2" PBR at 11,568' MO
Baker HB packer at 11,581' MD (2.89" ID)
OTIS XN-nipple at 11,598' MO (2.75" min ID, NO-GO)
3-1/7' SOS at 11,609' MD
1R-23L1PB3
TO 013,780' MD
1R-23L1P82
TO 0 13,010' MD
OH -Anchor Baal @ 12,130' MD
1R --Inn 1
TD 014,OW MD
OH-Awt w BIM 012,190' MD
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or victoria Loeoo@alaska aoy
From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Sent: Tuesday, October 29, 2019 9:18 AM
To: Loepp, Victoria T (CED) <victoria loepp@alaska.gov>
Cc: Ohlinger, James J <James J Ohlinger@conocophillips.com>
Subject: RE: [EXTERNAL]KRU 1R-23(PTD 191-101) CTD Status
Hello Victoria,
We did mill a window off of a High Expansion Wedge at 11,682' MD and drilled three plugback that were not lined. I've
attached a current CTD schematic of progress to date.
We will submit a sundry for plugging the C Sand perforations and setting a new whipstock this afternoon, as well as close
out the current sundry (319-421) for setting the High Expansion Wedge that is currently in the well.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Sent: Tuesday, October 29, 2019 8:27 AM
To: McLaughlin, Ryan <Ryan McLaughlin@conocophillips.com>
Subject: [EXTERNAL]KRU 1R-23(PTD 191-101) CTD Status
Ryan,
Was the window milled? Any drilling? If the 7" is cemented, then you will be plugging the C Sand perforations and the
sundry will be a plug for redrill. A current status WBS would be useful.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil 8 Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria LoepI20alaska.00v
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)7931247 or victoria Loepp,, alaska.aov
From: McLaughlin, Ryan <Ryan.McLauahlin@conocophillips.com>
Sent: Monday, October 28, 2019 1:41 PM
To: Loepp, Victoria T (CED) <victoria loepp@alaska.aov>
Subject: RE: [EXTERNAL]KRU 1R-23 Operations Shutdown
Victoria,
I've attached a PDF of the email. Let me know if you have trouble opening.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
From: Loepp, Victoria T (CED) <victoria.loepp@alaska.eov>
Sent: Monday, October 28, 2019 1:35 PM
To: McLaughlin, Ryan <Ryan McLaughlin@conocophillips.com>
Subject: Re: [EXTERNAL]KRU 1R-23 Operations Shutdown
Unable to open attachment. Please resend in different form -
Sent from my iPhone
On Oct 28, 2019, at 1:12 PM, McLaughlin, Ryan <Ryan McLaughlin@conocophillips.com> wrote:
Victoria,
We encountered a very similar situation in February of this year where we moved CDR3 off of the well in
order to perform some wellwork before making another attempt at drilling the laterals in June. I've
attached the email where you stated that a sundry for operations shutdown was not required.
Similarly, in our current situation on 111-23 we are not shutting down operations, we will be moving the
CDR3 off the well to prepare it for a different type of window exit, and returning to continue drilling
under the approved permits as soon as we can.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
From: Loepp, Victoria T (CED) cvictoria loepp@aIaska.gov>
Sent: Monday, October 28, 2019 11:34 AM
To: McLaughlin, Ryan <Ryan McLaughlin 2conocophillips.com>
Subject: [EXTERNAL]KRU 111-23 Operations Shutdown
Ryan,
Please submit a sundry for Operations Shutdown as soon as possible with plans outlined to return to
the well.
Thanx,
Victoria
Sent from my iPhone
On Oct 28, 2019, at 11:05 AM, McLaughlin, Ryan
<Ryan McLaughlin eco nocophi Ili ps.com> wrote:
Hello Victoria,
I would like to give you a quick operations update for 1R-23. While drilling the 111-231-1
lateral, we struggled with hole cleaning issues in the 7" casing above our High Expansion
Wedge. After our third unsuccessful attempt at drilling this lateral we made the
decision to temporarily suspend rig operations and RDMO to our next well. After rigging
off CDR3 from IR -23, we plan on submitting a sundry to perforate the tubing tail with E -
line and pump cement in the 7" casing with service coil. This will set us up to return to
1R-23 as soon as possible with CDR3 and drill the permitted laterals from a cement pilot
hole window exit.
Please let me know if you have any questions.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
<mime -attachment>
THE STATE
01ALASKA
GOvE.RNOR MIKE DUNLEAVY
Kai Starck
CTD Director
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1R -23L1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 219-128
Surface Location: 4854' FNL, 144' FWL, SEC. 17, T12N, R10E, UM
Bottomhole Location: 1775' FNL, 3116' FWL, SEC. 9, T12N, R10E, UM
Dear Mr. Starck:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc,olasko.gov
Enclosed is the approved application for the permit to redrill the above referenced development well.
The permit is fora new wellbore segment of existing well Permit No. 191-101, API No. 50-029-22200-
00-00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner
DATED this27 day of September, 2019.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMk>_ ON
PERMIT TO DRILL
20 AAC 25.005
1 a. Type of Work: •
Drill ❑ Lateral ❑'
Redrill ❑ Reentry ❑
1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑
Stratigraphic Test ❑ Development - Oil ❑� ' Service - Winj ❑ Single Zone ❑' •
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
1 c. Specify if well is proposed.for:
Coalbed Gas ❑ Gas Hydrates ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket ❑✓ Single Well ❑
11. Well Name and Number:
ConocoPhillips Alaska, Inc.
Bond No. 5952180 .
KRU 1 R-231_1
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, AK 99510-0360
MD: 14,975' TVD: 7033'
7. Property Designation:, .
Kuparuk River Field /
Kuparuk River Oil Pool
4a. Location of Well (Governments] Section):
Surface: 4854' FNL, 144' FWL, Sec 17, T12N, R10E, UM
ADL 25627 ALK 2560
Top of Productive Horizon:
8. DNR Approval Number:
13. Approximate Spud Date:
4575' FNL, 1802' FWL, Sec 9, T12N, R10E, UM
LONS 83-134
10/1/2019
9. Acres in Property:
14. Distance to Nearest Property:
Total Depth:
1775' FNL, 3116' FWL, Sec 9, T12N, R10E, UM
2560
4790' '
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 88'
15. Distance to Nearest Well Open
Surface: x- 539830 • y- 5991630 • Zone- 4
GL / BF Elevation above MSL (ft): 45' a
to Same Pool: 2918', 1R-35
16. Deviated wells: Kickoff depth: 11,680 ' feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: 99 degrees
Downhole: 3515 1 Surface: 2841
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
3" WA - - - -
- - - - Unlined delineation lateral
w/anchored billet at 14,100' MD
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
12180' 7004' N/A 12178' 7003' N/A
Casing Length Size Cement Volume MD TVD
Conductor/Structural 79' 16" 331 sx AS 1 123' 123'
Surface 6289' 9-5/8" 1300 sx PF E, 630 sx Class'G' 6331' 4072'
Production 12149' 7" 380 sx Class'G' 12178' 7003'
Perforation Depth MD (ft): 11710'-11770' Perforation Depth TVD (ft): 6774'-6803'
Hydraulic Fracture planned? Yes❑ No ❑Q
20. Attachments: Property PlatBOP Sketch
❑
Drilling Program Time v. Depth Plot
Shallow Hazard Analysis
8✓
Diverter Sketch
e Seabed Report ❑ Drilling Fluid Program
8✓ 20 AAC 25.050 requirements
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be �)
deviated from without prior written approval. Contact Name: Ryan McLaughlin Ac
Authorized Name: .lamer6hllhger �'- /¢%J1:.�/L Contact Email: an.1T1C10U hlin 00 .0001
Authorized Title: Staff CTD Engineer Contact Phone: 907-265-6218
o
Authorized Signature: Date: 9—'" —
Commission Use Only
Permit to Drill Cp�API
Number: �l <'—1
Number:
50-0,---7iz-71 �-6� --��
Permit Approval �•r
Date: 2 1 '
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to exRlore for, test, or produce coalbed methane gas hydrates, or gas contained in shales: 1Q
Other .BOP *C�Sf P rISwYG fD 35-001 5 'J . Samples req'd: Yes ❑,/�.10� Mud log req'd: Yes ,❑,/.No�
7gnr1 v! ar�!'� ✓rn fC� �� l� < Jrv61 / 5 ii$ measures: Yes Lrj No❑ Directional svy req'd: Yes Ly No El
4 I/tG/ i a�7cc i s �9ry tri 7 Spacing exception rreq'd: Yes ElNo L --J/ Inclination -only svy mcl'd: Yes ❑ No1_1�0/
9 c me Ah o0 Post initial injection MIT req 'd: Yes❑ Nog
of Phis VVeW
APPROVED
Approved by: COMMISSIONER THEHECOMMISSION Date:
1 v� 9
,�-h4t iptyevised 5/2017 Fhi pefmit is valid for
41
f a
Submit Form and
proval per 20 AAC 25.005(9) Attachments in Duplicate
./-0r%L:/YJ
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
September 17, 2019
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill three laterals out of the KRU 1 R-23
(PTD# 191-101) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin on October 1st, 2019. The objective will be to drill three laterals — 1R-
231-1 and 1 R -23L1-01 will be unlined delineation laterals to the north and east, crosscutting through the A3 and
C1 sands. 1 R-231-1-02 will be drilled to the north targeting the C1 sands and lined with 2-3/8" solid and slotted
liner from TD up into the tubing tail
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20
AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of
being limited to 500' from the original point.
Attached to this application are the following documents:
- Permit to Drill Application Forms (10401) for 1R-231-1, 1R-231-1-01, & 1R-231-1-02
- Detailed Summary of Operations
- Directional Plans for 1R-231-1, 1R-231-1-01, & 1R-231-1-02
- Current wellbore schematic
- Proposed CTD schematic
If you have any questions or require additional information, please contact me at 907-265-6218.
Sincerely,
Ryan McL in
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Kuparuk CTD Lateral
1 R-231-1, 1 R-231-1-01, & 1 R-231-1-02
Application for Permit to Drill Document
1.
Well Name and Classification........................................................................................................ 2
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))...................................................................................................................2
2.
Location Summary .......................................................................................................................... 2
(Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................... _...... ...
3.
Blowout Prevention Equipment Information................................................................................. 2
(Requirements of 20 AAC 25.005(c)(3))................................................................................................................................................. 2
4.
Drilling Hazards Information and Reservoir Pressure.................................................................. 2
(Requirements of 20 AAC 25.005(c)(4))...............................................................................................................-................................2
S.
Procedure for Conducting Formation Integrity tests................................................................... 2
(Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2
6.
Casing and Cementing Program....................................................................................................3
(Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3
7.
Diverter System Information.......................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3
8.
Drilling Fluids Program.................................................................................................................. 3
(Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3
9. Abnormally Pressured Formation Information.............................................................................4
(Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4
10. Seismic Analysis.............................................................................................................................4
(Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4
11. Seabed Condition Analysis............................................................................................................4
(Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4
12. Evidence of Bonding......................................................................................................................4
(Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4
13. Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4
Summaryof Operations...................................................................................................................................................4
LinerRunning...................................................................................................................................................................5
14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................6
15. Directional Plans for Intentionally Deviated Wells....................................................................... 6
(Requirements of 20 AAC 25.050(b))...................................................................................................................................................... 6
16. Attachments....................................................................................................................................6
Attachment 1: Directional Plans for 1R-23, 1R-231-1-01, & 1R-231-1-02.........................................................................6
Attachment 2: Current Well Schematic for 1 R-23, 1 R-231-1-01, & 1R-231-1-02...............................................................6
Attachment 3: Proposed Well Schematic for 1R-23, 1R-231-1-01, & 1 R-23L1-02...........................................................6
Page 1 of 6 September 16, 2019
PTD ADDlication: 1R -23L1, 1R-231-1-01, &1R-231-1-02
Well Name and Classification
(Requirements of 20 AAC 25.005(o and 20 AAC 25.005(b)) t✓i
The proposed laterals described in this document are 1R-23, 1 R -23L1-01, & 1R-231-1-02. The laterals will be
classified as "Development - Oil" wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the C1 and A3 sand packages in the Kuparuk reservoir. See attached 10-401 form for
surface and subsurface coordinates of 1R-23, 1R-231-1-01, & 1R-231-1-02.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the
maximum formation pressure in the area of 3517 psi in 1 R-23 (i.e. 10.0 ppg EMW), the maximum
potential surface pressure in 1 R-23, assuming a gas gradient of 0.1 psi/ft, would be 2841 psi See the
"Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 1R-23 was measured to be 3517 psi (10.0 ppg EMW) on 12/20/2010. The
maximum downhole pressure in the 1 R-23 vicinity is the 1 R-23 at 3517 psi or 10.0 ppg EMW on 12/20/2010_
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) i
No specific gas zones will be drilled; gas injection has been performed in this area, so there is a chance of
encountering gas while drilling the 1 R-23 laterals. If gas is detected in the returns the contaminated mud canbe diverted to a storage tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 1 R-23 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 1 R -23L1, 1 R-231-1-01, & 1 R-231-1-02 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling
operations so a formation integrity test is not required.
Page 2 of 6 September 16, 2019
PTD Application: 11R-231_1, 1R -23L1-01, & 1R -23L1-02
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm MD
MD
MD
TVDSS
TVDSS
Conductor
16"
62.5
H-40
Welded
Surface
Delineation lateral —will be unlined '
1R -23L1 -
N/A
N/A
N/A
N/A
with an anchored billet set at 14,100'
36.0
J-55
BTC
Surface
6331'
MD
4072'
3520
2020
Production
7"
Delineation lateral — will be unlined
1 R-231_1-01
N/A
N/A
N/A
N/A
with an anchored billet set at 12,500'
4980
4320
Tubing
3-1/2"
9.3
MD
EUEABMOD
Surface
11,610
Surface
6727'
2-3/8", 4.7#, L-80, ST -L slotted/solid
1R -23L1-02
11,605'
17,700'
6636'
6739'
liner, with oil and water tracer pups,
and sealbore deployment sleeve
Existina Casin&Liner Information
Category
OD
Weight
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
ND
Bu64s Collapse
Conductor
16"
62.5
H-40
Welded
Surface
123'
Surface
123'
10
670
Surface
9-5/8"
36.0
J-55
BTC
Surface
6331'
Surface
4072'
3520
2020
Production
7"
26.0
L-80
NSCC
Surface
12,178'
Surface
7003'
4980
4320
Tubing
3-1/2"
9.3
J-55
EUEABMOD
Surface
11,610
Surface
6727'
8430
7500
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(6))
Diagram of Drilling System ,
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Water based Power-Vis�milling fluid (8.6 ppg)
— Drilling operations: Water based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically
overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: BHA's will be deployed using standard pressure deployments and the well will
be loaded with a weighted completion fluid in order to provide formation over -balance and maintain
wellbore stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 -psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information". 11
In the IR -23 laterals we will target a constant BHP of 11.8 EMW at the window. The constant BHP target will be
adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased
Page 3 of 6 September 16, 2019
PTD Application. 1R-231_1, 1R -23L1-01, & 1R-231_1-02
reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed
for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change
in depth of circulation will be offset with back pressure adjustments.
Pressure at the 1R-23 Window 111,680' MD. 6760' TVD) Using MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 1 R-23 is an injector equipped with 3-1/2" tubing and 7" production casing. In preparation for CTD
operations on this well, the XN nipple will have to be milled out and a high expansion wedge will be set pre -rig.
CDR3-AC will mill a 2.80" window in the production casing at a depth of 11,680' MD. After that, the 1 R-231_1
delineation lateral will be drilled to the north and crosscut through the C1 and A3 sands to determine rock quality
and oil -water contact in both sand packages. A anchored billet will be set and the 1R-231-1-01 lateral will be
drilled to the east, crosscutting through the C1 and A3 sands to determine rock quality and OWC in the eastern
fault block. Finally, an anchored billet will beset and the IR -231-11-02 lateral will be drilled to the north, targeting
the C1 sands, and lined with 2-3/8" slotted liner to the tubing tail. / i�h/; po✓ t�
Pre -CTD Work H
1. RU Slickline: Dummy whipstock drift, SBHP
2. RU E -line: Caliper
3. RU CTU: Mill D -Nipple
Page 4 of 6 September 16, 2019
Pumps On 1.8 bpm)
Pumps Off
Formation Pressure 10.0
3515 psi
3515 psi
Mud Hydrostatic 8.6
3023 psi
3023 psi
Annular friction (i.e. ECD, 0.080psi/ft)
934 psi
0 psi
Mud + ECD Combined
no chokepressure)
3957 psi ,
Overbalanced -442psi)
3023 psi
Underbalanced -492psi)
Target BHP at Window 11.8
4148 psi
4148 psi
Choke Pressure Required to Maintain
Target BHP
191 psi
1125 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
Background
KRU well 1 R-23 is an injector equipped with 3-1/2" tubing and 7" production casing. In preparation for CTD
operations on this well, the XN nipple will have to be milled out and a high expansion wedge will be set pre -rig.
CDR3-AC will mill a 2.80" window in the production casing at a depth of 11,680' MD. After that, the 1 R-231_1
delineation lateral will be drilled to the north and crosscut through the C1 and A3 sands to determine rock quality
and oil -water contact in both sand packages. A anchored billet will be set and the 1R-231-1-01 lateral will be
drilled to the east, crosscutting through the C1 and A3 sands to determine rock quality and OWC in the eastern
fault block. Finally, an anchored billet will beset and the IR -231-11-02 lateral will be drilled to the north, targeting
the C1 sands, and lined with 2-3/8" slotted liner to the tubing tail. / i�h/; po✓ t�
Pre -CTD Work H
1. RU Slickline: Dummy whipstock drift, SBHP
2. RU E -line: Caliper
3. RU CTU: Mill D -Nipple
Page 4 of 6 September 16, 2019
PTD Application: 1R-231_1, 1R -23L1-01, & 1R-231_1-02
4. RU E -Line: Set High Expansion Wedge
Rise Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1116" BOPE, test.
2. 1 R-231_1 Lateral (Delineation Lateral A/C Sands - North)
a. Mill 2.80" window at 11,680' MD '
b. Drill 3" bi-center lateral to TD of 14,975' MD ,
c. Set anchored aluminum billet at 14,100' MD
3. IR -231-1-01 Lateral (Delineation Lateral A/C Sands -East)
a. Kickoff of the aluminum billet at 14,100' MD
b. Drill 3" bi-center lateral to TD of 16,520' MD
c. Set anchored aluminum billet at 12,500' MD
4. 1R-231-1-02 Lateral (Cl Sand — North)
a. Kickoff of the aluminum billet at 12,500' MD
b. Drill 3" bi-center lateral to a TD of 17,000' MD
c. Run 2-318" slotted/blank liner with oil/water tracer pups and seal bore deployment sleeve from
TD up to 11,595' MD
5. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC rig.
Post -Rig Work
1. RU E -Line: Set LTP
2. Return well to production.
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the swab valve on the
Christmas tree. MPD operations require the BHA to be lubricated under pressure using the swab valve on the
Christmas tree, deployment ram on the BOP, check valve and ball valve in the BHA, and a slick -line lubricator.
This pressure control equipment listed ensures reservoir pressure is contained during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the swab valve on the tree is closed to isolate reservoir pressure. The lubricator is installed on the
BOP riser with the BHA inside the lubricator.
— Pressure is applied to the lubricator to equalize across the swab valve. The swab valve is opened and the
BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the deployment ram is closed on the BHA to isolate reservoir
pressure via the annulus. A closed ball valve and check valve isolate reservoir pressure internal to the
BHA. Slips on the deployment ram prevent the BHA from moving when differential pressure is applied.
The lubricator is removed once pressure is bled off above the deployment ram.
— The coiled tubing is made up to the BHA with the ball valve in the closed position. Pressure is applied to
the coiled tubing to equalize internal pressure and then the ball valve is opened. The injector head is
made up to the riser, annular pressure is equalized, and the deployment ram is opened. The BHA and
coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
— The 1 R-231-1, 1 R-231_1-01, & 1 R-231_1-02 laterals will be displaced to an overbalancing fluid prior to
running liner. See "Drilling Fluids" section for more details.
Page 5 of 6 September 16, 2019
PTD Application: 1R-231-1, 1R -23L1-01, & 1R-231-1-02
- While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency
deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a
deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide
secondary well control while running 2-3/8" liner
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well. °
• All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1R-18
or 16 disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(6))
- The Applicant is the only affected owner.
- Please see Attachment 1: Directional Plans
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
- MWD directional and gamma ray will be run over the entire open hole section.
- Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name Distance
11R-231-11
4790' "
1 R -23L1-01
3041'
1R -23L1-02
2541'
Distance to Nearest Well within Pool
Lateral Name
Distance
Well
111-231-11
2918'
1 R-35
1111-231-11-011
2918'
1 R-35
1111-231-11-02
2810'
1 R-35
16. Attachments
Attachment 1: Directional Plans for the 1R -23L1, 1R -23L1-01, & 1R-23L1-02laterals
Attachment 2: Current Well Schematic for IR -23
Attachment 3: Proposed CTD Well Schematic for the 1R -23L1, 1R -23L1-01, & 1R -23L 1-02 laterals
Page 6 of 6 September 16, 2019
ConocoPhillips
x.num.m Trtv xonn WELLBORE DETAILS: IR -23L1
Project: Kuparuk River Unit _2MUM�NN Nwm'31
See: Kuparuk IR Pad rac
M.MpNc nYtl Parent Wellbore: lR-23
Well: 1R•21 s�roin. sre acea Te on MD: 11600.00
Wellbore: 1R -23L1 nie
Plan: 1R-23L1_wp02(1R-231IR•23LI) uo4N: apoum,e
Comfireb MI RdI: VleM iR-23, Tor NVN
V¢Nkel (MI) Rtlnav: 1823 ® 38.00eft 11 n2N
seem Net Rne'erx»'. 311 (MN. Omit UGHES
Meaewe3DegM1Rahreme'. 1142 08 DDcA(1110) aGEranpaM
CekJaEm M1bI Me.. C.Me
O 9DUW
b
+ 84001
t
p 9800
720D-
66001
20D-
btiO 1
O
L7
6000
14011
1801
M, IM -11
.' ♦ � � __ � —rte
I:YS/IR-� r•
1
ue -1 la.n
Z /
1800
12
-1200 -600 0 600 1300 1800 2400 1000 36U0 4200 4800 5400 6000 6600 7200 9800 8400 9000 9600 10200 10900 11400 13000 12,,00 13200 13800 14400 15000 15600 16_00 16800 1740U 18000 16600
1R_1,)1rs-1,- West( -)/East(+) (600 usft/in)
1R-23 @ 88.00usX (iR-23)
ConocoPhillips
ConocoPhillips Alaska Inc—Kuparuk
Kuparuk River Unit
Kuparuk 1R Pad
1 R-23
1 R-231-1
Plan: 1 R-231-1_wp02
Standard Planning Report
11 September, 2019
BA UGHES
a GE company
ConocoPhillipsBA ER
ConocoPhillips Planning Report UGHES
a GEcompany
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaska Inc_Kuparuk
Project:
Kuparuk River Umt_2
Site:
Kuparuk 1 R Pad
Well:
1 R-23
Wellbore:
1R-231-1
Design:
1R-23L1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well iR-23
Mean Sea Level
iR-23 @ 88.00usft (IR -23)
True '
Minimum Curvature
Project Kupamk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site Kuparuk 1R Pad
1R-23
Site Position:
Northing:
5,991,050.01 usft
Latitude:
70° 23' 11.370 N
From: Map
Easting:
539,829.93 usft
Longitude:
149° 40'33.803 W
Position Uncertainty: 0.00 usft
Slot Radius:
0.000in
Grid Convergence:
0.31 °
Well
1R-23
Well Position
+NIS
0.00
usft
Northing:
5,991,630.1g usft
Latitude:
70° 23' 17.076 N
Field Strength
+E/.W
0.00
usft
Easting:
539,829.67 usft
Longitude:
149' 40'33.721 W
Position Uncertainty
0.00
usft
Wellhead Elevation:
usft
Ground Level:
0.00 usft
Wellbore
1R-23LI
Magnetics
Model Name
Sample
Date
Declination
Dip Angle
Field Strength
BGGM2018
11/1/2019
16.37
80.88
57,403
Design
1R-23L1_wP02
Audit Notes:
Version:
Phase:
PLAN
Tie On
Depth:
11,600.00
Vertical Section:
Depth From (TVD)
+NIS
+E/.W
Direction
(usft)
(usft)
(usft)
(°)
0.00
0.00
0.00
45.00
Plan Sections
-
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+NI -S
+EAW
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°1100usft) (°1100usft)
('1100usft)
(°) Target
11,600.00
61.91
45.26
6,633.88
5,511.92
6.868.29
0.00
0.00
0.00
0.00
11,680.00
61.67
44.96
6,671.69
5,561.67
6,918.23
0.45
-0.30
-0.37
-132.30
11,709.00
66.89
44.96
6,684.28
5,580.15
6,936.69
18.00
18.00
0.00
0.00
11,755.91
88.00
44.96
6,694.42
5,612.37
6,968.86
45.00
45.00
0.00
0.00
12,000.00
88.09
62.06
6,702.81
5,756.91
7,164.25
7.00
0.04
7.00
90.00
12,250.00
90.57
44.73
6,705.75
5,905.41
7,364.14
7.00
0.99
-6.93
-82.00
12,650.00
91.45
16.74
6,698.56
6,245.75
7,566.52
7.00
0.22
-7.00
-88.00
12,950.00
100.40
35.86
6,667.34
6,511.91
7,697.60
7.00
2.99
6.37
64.00
13,300.00
88.81
14.17
6,638.94
6,825.85
7,843.47
7.00
-3.31
-6.20
-117.00
13,575.00
90.52
33.34
6,640.58
7,076.36
7,953.72
7.00
0.62
6.97
85.00
13,850.00
84.96
14.89
6,651.51
7,325.95
8,065.54
7.00
-2.02
-6.71
-107.00
14,050.00
85.11
28.94
6,668.91
7,510.33
8,139.72
7.00
0.08
7.03
90.00
14,175.00
85.17
20.16
6,679.52
7,623.51
8,191.42
7.00
0.05
-7.03
-90.00
14,575.00
66.10
358.87
6,779.39
8,000.94
8,257.82
7.00
4.77
-5.32
-135.00
14,975.00
64.96
350.17
6,945.36
8,362.88
8,223.21
2.00
-0.29
-2.18
-100.00
9/11/2019 11 11:47AM Page 2 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Planning Report UGHES
Wa RTany
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaska Inc Kupamk
Project:
Kupamk River Unit_2
Site:
Kupaluk 1 R Pad
Well:
1R-23
Wellbore:
1R -23L1
Design:
IR-23L1wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 R-23
Mean Sea Level
1 R-23 @ 88.00usft (1 R-23)
True
Minimum Curvature
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Tcolface
Map
Map
Depth
(usft)
Inclination
(°)
Azimuth
0
System
(usft)
+N/ -S
(usft)
+EI -W
(usft)
Section
(usft)
Rate
(°1100usft)
Azimuth
(°I
Northing
(usft)
Easting
(usft)
11600.00
61.91
4526
6,633.88
5,511.92
6,868.29
8,754.13
0.00
0.00
5,997,178.07
546,667.83
TIP
11,680.00
61.67
44.96
6,671.69
5,561.67
6,918.23
8,824.62
0.45
-132.30
5,997,228.08
546,717.50
KOP
11,700.00
65.27
44.96
6,680.63
5,574.33
6,930.87
8,842.51
18.00
0.00
5,997,240.81
546,730.08
11,709.00
66.89
44.96
6,684.28
5,580.15
6,936.69
8,850.74
18.00
0.00
5,997,246.66
546,735.86
Start
Build 45.00
11,755.91
88.00
44.96
6,694.42
5,612.37
6,968.86
8,896.27
45.00
0.00
5,997,279.04
546,767.85
Start
DLS 7.00 TFO
90.00
11,800.00
88.00
48.05
6,695.95
5,642.69
7,000.82
8,940.31
7.00
90.00
5,997,309.54
546,799.65
11,900.00
88.03
55.05
6,699.42
5,704.80
7,079.04
9,039.54
7.00
89.89
5,997,372.05
546,877.53
12,000.00
88.09
62.06
6,702.81
5,756.91
7,164.25
9,136.64
7.00
89.65
5,997,424.61
546,962.45
Start
DLS 7.00 TFO
52.00
12,100.00
89.07
55.12
6,705.29
5,808.98
7,249.51
9,233.75
7.00
-82.00
5,997,477.12
547,047.43
12,200.00
90.07
48.20
6,706.03
5,670.97
7,327.90
9,333.01
7.00
-81.83
5,997,539.53
547,125.48
12,250.00
90.57
44.73
6,705.75
5,905.41
7,364.14
9,382.98
7.00
-81.78
5,997,574.15
547,161.53
Start
DLS 7.00 TFO
-88.00
12,300.00
90.69
41.23
6,705.20
5,941.98
7,398.22
9,432.94
7.00
-88.00
5,997,610.90
547,195.41
12,400.00
90.93
34.24
6,703.78
6,021.00
7,459.37
9,532.07
7.00
-88.04
5,997,690.24
547,256.14
12,500.00
91.15
27.24
6,701.96
6,106.89
7,510.45
9,628.91
7.00
-88.14
5,997,776.39
547,306.75
12,600.00
91.35
20.24
6,699.78
6,198.35
7,550.67
9,722.02
7.00
-88.26
5,997,868.06
547,346.48
12,650.00
91.45
16.74
6,698.56
6,245.75
7,566.52
9,766.75
7.00
-88.42
5,997,915.53
547,362.07
Start
DLS 7.00 TFO
64.00
12,700.00
92.98
19.89
6,696.63
6,293.17
7,582.21
9,811.38
7.00
64.00
5,997,963.03
547,377.52
12,800.00
96.01
26.22
6,688.79
6,384.85
7,621.22
9,903.76
7.00
64.12
5,998,054.91
547,416.03
12,900.00
98.97
32.62
6,675.75
6,471.16
7,669.87
9,999.22
7.00
64.62
5,998,141.47
547,464.22
12,950.00
100.40
35.86
6,667.34
6,511,91
7,697.60
10,047.63
7.00
65.45
5,998,182.36
547,491.72
Start
DLS 7.00 TFO
-117.00
13,000.00
98.80
32.70
6,658.99
8,552.64
7,725.35
10,096.06
7.00
-117.00
5,998,223.23
547,519.26
13,100.00
95.52
26.47
6,646.52
6,638.87
7,774.29
10,191.65
7.00
-117.53
5,998,309.72
547,567.73
13,200.00
92.18
20.30
6,639.80
6,730.40
7,813.86
10,284.34
7.00
-118.30
5,998,401.45
547,606.81
13,300.00
88.81
14.17
6,638.94
6,825.85
7,843.47
10,372.77
7.00
-118.72
5,998,497.04
547,635.90
Start
DLS 7.00 TFO
86.00
13,400.00
89.42
21.14
6,640.49
6,921.07
7,873.77
10,461.53
7.00
85.00
5,998,592.41
547,665.70
13,500.00
90.05
28.11
6,640.95
7,011.91
7,915.41
10,555.21
7.00
84.89
5,998,683.47
547,706.85
13,575.00
90.52
33.34
6,640.58
7,076.36
7,953.72
10,627.87
7.00
84.86
5,998,748.12
547,744.81
Start
DLS 7.00 TFO
-107.00
13,600.00
90.01
31.67
6,640.46
7,097.45
7,967.15
10,652.28
7.00
-107.00
5,998,769.27
547,758.13
13,700.00
87.96
24.97
6,642.24
7,185.41
8,014.56
10,748.00
7.00
-107.01
5,998,857.47
547,805.06
13,800.00
85.95
18.26
6,647.55
7,278.18
8,051.32
10,839.60
7.00
-106.89
5,998,950.44
547,841.33
13,850.00
84.96
14.89
6,651.51
7,325.95
8,065.54
10,883.43
7.00
-106.53
5,998,998.27
547,855.29
Start
DLS 7.00 TFO
90.00
13,900.00
84.97
18.40
6,655.90
7,373.66
8,079.80
10,927.25
7.00
90.00
5,999,046.05
547,869.30
14,000.00
85.05
25.43
6,664.62
7,466.02
8,116.96
11,018.84
7.00
89.69
5,999,138.60
547,905.96
14,050.00
85.11
28.94
6,668.91
7,510.33
8,139.72
11,066.26
7.00
89.08
5,999,183.03
547,928.48
Start
OLS 7.00 TFO
50.00
14,100.00
85.12
25.43
6,673.17
7,554.64
8,162.48
11,113.68
7.00
-90.00
5,999,227.45
547,950.99
14,175.00
85.17
20.16
6,679.52
7,623.51
8,191.42
11,182.84
7.00
-89.70
5,999,296.47
547,979.57
Start
DLS 7.00 TFO
-136.00
14,200.00
83.93
18.92
6,681.89
7,646.96
8,199.74
11,205.31
7.00
-135.00
5,999,319.96
547,987.76
14,300.00
79.02
13.87
6,696.72
7,741.77
8,227.66
11,292.09
7.00
-134.88
5,999,414.91
548,015.18
14,400.00
74.20
8.65
6,719.89
7,837.10
8,246.69
11,372.96
7.00
-134.13
5,999,510.33
548,033.69
9/11/2019 11:11:47AM
Page 3
COMPASS 5000.14 Build 85H
�. ConocoPhillips BA ER
ConocoPhillips Planning Report BAT
.GE. ,,
Database:
EDT 14 Alaska Production
Company:
ConcooPhillips Alaska Inc_Kupamk
Project:
Kupamk River Unit 2
Site:
Kupamk 1R Pad
Well:
1 R-23
Wellbore:
1 R-23LI
Design:
1R-2311_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well 1 R-23
Mean Sea Level
1R-23 @ 88.00usft(1 R-23)
True
Minimum Curvature
Planned Survey
Local Coordinates
Depth
-NI-S
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Measured
(usft)
(usft) Name
TVD Below
(in)
14,97500
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination
Azimuth
System
-NIS
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
V)
(')
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°1
(usft)
(usft)
14,500.00
69.50
3.19
6,751.05
7,931.54
8,256.54
11,446.71
7.00
-132.92
5999,60482
548,043.04
14,575.00
66.10
358.87
6,779.39
8,000.94
8,257.82
11,496.68
7.00
-131.22
5,999,674.21
548,043.95
Start DLS
2.00 TFO
-100.00
14,600.00
66.01
358.33
6,789.54
8,023.78
8,257.26
11,512.44
2.00
-100.00
5,999,697.05
548,043.27
14,700.00
65.69
356.17
6,830.46
8,114.92
8,252.89
11,573.78
2.00
-99.78
5,999,788.15
548,038.41
14,800.00
65.39
353.99
6,871.86
8,205.60
8,245.08
11,632.39
2.00
-98.90
5,999,878.78
548,030.12
14,900.00
65.13
351.81
6,913.71
8,295.72
8,233.86
11,686.18
2.00
-98.00
5,999,968.83
548,018.43
14,975.00
64.96
350.17
6,945.36
8,362.88
8,223.21
11,728.14
2.00
-97.08
6,000,035.92
548,007.42
Planned TO at 14975.00
Casing Points
Local Coordinates
Depth
-NI-S
Measured
Vertical
Casing
Hole
Depth
Depth
Diameter
Diameter
(usft)
(usft) Name
(in)
(in)
14,97500
6.945.36 2-3/8"
2.375
3.000
lien Annotations
Measured
Depth
(usft)
11,600.00
11,680.00
11,709.00
11,755.91
12,000.00
12,250.00
12,650.00
12,950.00
13,300.00
13,575.00
13,850.00
14,050.00
14,175.00
14,575.00
14,975.00
Vertical
Local Coordinates
Depth
-NI-S
+EI -W
(usft)
(usft)
(usft)
6,633.88
5,511.92
6,868.29
6,671.69
5,561.67
6,918.23
6,684.28
5,580.15
6,938.69
6,694.42
5,612.37
6,968.86
6,702.81
5,756.91
7,164.25
6,705.75
5,905.41
7,364.14
6,698.56
6,245.75
7,566.52
6,667.34
6,511.91
7,697.60
6,638.94
6,825.85
7,843.47
6,640.58
7,076.36
7,953.72
6,651.51
7,325.95
8,065.54
6,668.91
7,510.33
8,139.72
6,679.52
7,623.51
8,191.42
6,779.39
8,000.94
8,257.82
6,945.36
8,362.88
8,223.21
Comment
TIP
KOP
Start Build 45.00
Start DLS 7.00 TFO 90.00
Start DLS 7.00 TFO -82.00
Start DLS 7.00 TFO -88.00
Start DLS 7.00 TFO 64.00
Start DLS 7.00 TFO -117.00
Start DLS 7.00 TFO 85.00
Start DLS 7.00 TFO -107.00
Start DLS 7.00 TFO 90.00
Start DLS 7.00 TFO -90.00
Start DLS 7.00 TFO -135.00
Start DLS 2.00 TFO -100.00
Planned TO at 14975.00
9/11/2019 11 11 47A Page 4 COMPASS 5000.14 Build 85H
ConocoPhillips BA ER
ConocoPhillips Anticoljision Report BAT
aGEcompany
Company:
ConocoPhillips Alaska lno_Kupamk
Project:
Kuparuk River Unit 2
Reference Site:
Kuparuk 1R Pad
Site Error:
0.00 usft
Reference Well:
1 R-23
Well Error:
0.00 usft
Reference Wellbore
1R -23L7
Reference Design:
1R-231-1_wp02
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well 1R-23
1 R-23 @ 88.00usft (IR -23)
IR -23 @ 88.00usft (IR -23)
True
Minimum Curvature
2.00 sigma
EDT 14 Alaska Production
Offset Datum
Reference
1R-231-1wpO2
Filter type:
GLOBAL FILTER APPLIED. All wellpaths within 200'+
100/1000 of reference
Reference
Interpolation Method:
MD Interval 25.00usft
Error Model:
ISCWSA
Depth Range:
11,600.00 to 14,975.00usft
Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum ellipse separation of 3,000.00 usft
Error Surface:
Combined Pedal Curve
Warning Levels Evaluated at: 2.79 Sigma
Casing Method:
Added to Error Values
Suryey Tool Program Date 913=19
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
100.00 11,600.0018-23(1 R-23) GCT -MS Schlumberger GCT multishot
11,600.00 14,975.00 1R-23L1_wp02(1R-231-1) MWD OWSG OWSG MWD -Standard
Summary
Kuparuk I Pad- iR-23-1R-23-1R-23
Reference
Offset
Distance
Measured
Measured
Between
Between
Separation Warning
Site Name
Depth
Depth
Centres
Ellipses
Factor
Offset Well - Wellbore - Design
(usft)
(usft)
(usftl
(usft)
Distance
Kuparuk 1R Pad
Measured
Vertlwl
Measured
Vertical
1R -23 -1R -23-1R-23
11,625.00
11,625.00
0.00
-314.61
0.000 STOP Drilling, CC, SF
1R -23 -1R -23-1R-23
11,675.00
11,675.00
0.00
-315.80
0.000 STOP Drilling, ES
1 R-23 - 1 R-23 - 1 R-23
11,900.00
11,925.00
92.87
87.73
18.046 CC, ES, SF
1R-23- 1R-231-1-01 - 1R-231-1-01_wp03
14,406.63
14,425.00
69.01
62.39
10.428 CC, ES, SF
1 R-23 - IR -231-1-02 - 1 R-231-1-02
12,824.78
12,825.00
18.56
18.20
51.314 CC
1R -23 -1R -231 -1 -02 -IR -231-1-02
12,848.67
12,850.00
19.87
17.96
10.401 ES
1R -23 -1R -231-1-02-1R-231-1-02
14,337.72
14,325.00
78.31
44.12
2.290 Caution Monitor Closely, SF
1 R-35 - 1 R-35 - 1 R-35
0.00
-0.98
0.98
0.000 STOP Drilling
Out of range
1 R-35 - 1 R-35 - 1 R-35
11.62567
6.73366
159.90
160.11
Out of range
1 R-35 - 1 R-35 - 1 R-35 TD Projection
6,88393
0.00
-31461
314.61
Out of range
1 R-35 - 1 R-35 - 1 R-35 TD Projection
6.745.40
11,61
6.745,40
11.62
Out of range
Offset Design
Kuparuk I Pad- iR-23-1R-23-1R-23
Me she son" 0.90 raft
Survey Program:
100-GCT-Mfi
Oasetwell Error. 0.00 Wit
Reference
Want
Seal Major
Asia
Distance
Measured
Vertlwl
Measured
Vertical
Resonance
Onset
Azimuth
Waal wellbore Centre
Uttep n
Schanon
611nlroum
Separation blaming
Depth
Depth
Depth
Depth
from NOM
rN/S
rEl-w
centre,
Ellipses
3epa2ao0
Factor
Ivam
(usty)
(usft)
loam
Ilan)
loon)
1°I
luaft)
(.it)
lung
(mm
lien)
11,62500
6,733.66
11,62500
6,733.66
0.31
043
136.36
5,527.45
6.88393
0.00
-0.98
0.98
0.000 STOP Drilling
11625.00
6733.66
11.62567
6.73366
159.90
160.11
138.36
5,527.45
6,88393
0.00
-31461
314.61
0.000 STOP Drilling, CO, SF
11,650.00
6.745.40
11,61
6.745,40
11.62
0.06
136.30
5,543.00
609955
0.00
-1.71
1.71
0.001 STOP Drilling
11.650.00
6,745.48
1165090
6.745.48
160.12
160.54
136130
5,543.00
600955
0100
-31521
315.21
0.000 STOP Drilling
11,675.00
6,757,32
11,67500
6,757.32
0.93
1.29
136.24
5,558.56
6915.12
0.00
-2.44
245
0.001 STOP Drilling
11.675.00
6,757.32
11,675.00
6,757.32
160.34
160.97
136.24
5,558.55
6.915.12
0.00
-315.80
315.80
0.000 STOP Drilling. Es
11699.97
6.780.62
11,700.00
6,769.19
1.00
1.72
-131.36
5,574.13
6,930.65
0.64
-1.50
2.14
0.298 STOP Drilling
11.699.97
6.760.62
11,700,00
6,789.19
160,39
161.39
-131.36
5,574.13
6,930.88
0.84
-239.13
239.76
0.003 STOP Drilling
11.724.42
6,777.45
11,725.00
6,781.14
1.01
2.15
-13138
5,589.70
6918.15
364
1.38
247
1.557 Ce ipn Monitor Closely
11,72442
6)77.45
11,725.00
6,781.14
16740
161.82
-134.36
5,569.]0
6.946.15
3.84
-22].6]
231,52
0.017 STOP Drilling
11,746.90
6781.78
11,750.00
6,793.22
1.02
2.58
-134.51
5.601
6.961.56
11.50
8]6
273
4.219
11,74690
6,781.78
11,750.00
6793.22
160.42
162.25
434.51
5.601
6.961.58
11.50
-203.79
215.29
0.053 STOP Ori
11,768.32
6.782.85
11,75.00
6.805.42
1,04
301
-133,48
5.620.73
6.976.94
22.59
19,58
3,01
7,514
11,768.32
8.782.85
11,75.W
8,805.42
190.44
182.67
-133,48
5,1
6,976.94
22,59
481.58
207,15
0109 STOP Drilling
11,790.46
8,783.62
11,800.00
6817.74
1.06
344
-130.98
5636.19
699233
34.16
30.81
3.35
10.195
11,79046
6.783.62
11,800.00
6,81].]4
160.47
163.10
-130.98
5.636.19
8,992.23
34.16
-173.45
207.61
0.165 STOP Drilling
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
9/3/2019 2.13:21PM Page 2 COMPASS 5000.14 Build 85H
Conoco4iillips
Project: Kupmuk River Unit_2
Site: Kuparuk IR Pad
Ar...T-.
laentie. lea
M•v+la Fka
WELLBORE DETAILS: IR -231-1
REFERENCE INFORMATION
Parent 11-23
CoarmwalwEl Reare"a. VIA 1R-23. True Norm
Well: IR -23
eberyN: siaxan-neonVmeal
MD. 11600.00
MID
(NDI Re Mato, Akan sea
Wellbore: 1R-231-7
as•s.mo�Ms)
Cate.
oaoEl
N O
Plan: iR-23L1_vry02 (tR-2311 R-231-1)
11"
rate. itNRJt
Mmes eooM-mI
a�6(IR'2J)
Eaw..:'R-23 88
µyyyrM hpA WMerce: I
ilj'
M 7700
raturn
eelmkem Menne: Mxmum Oumskre
WELL DETAILS: 1R-23
+NI -S +E/ -W NorthiN Easting Latitude Longitude
0.00 0.00 5991630.19 539629.67 70' 23' 17.076 N 149° 40'33.721 W
See MD Inc Azi eg TFace VS A Annotation
1 11600.00 61.91 45.26 6633.88 5511.92 6868.29 0.00 0.00 8754. 3 TIP
2 11680.00 61.67 44.96 6671.69 5561.67 6918.23 0.45 -132.30 8824. 2 KOP
3 11709.00 66.89 44.96 6684.28 5580.15 6936.69 18.00 0.00 8850. 4 Start Build 45.00
4 11755.91 88.00 44.96 6694.42 5612.37 6968.86 45.00 0.00 8896. 7 Stan DLS 7.00 TFO 90 00
5 12000.00 88.09 62.06 6702.81 5756.91 7164.25 7.00 90.00 9136. 4 Start DLS 7.00 TF0 -8 .01
6 12250.00 90.57 44.73 6705.75 5905.41 7364.14 7.00 -82.00 9382. 8 Start DLS 7.00 TFO -8 .01
7 12650 00 91.45 16.74 6698.56 6245.75 7566.52 7.00 -88.00 9766. 5 Start DLS 7.00 TFO 00
8 12950.00 100.40 35.86 6667.34 6511.91 7697.60 7.00 64.00 10047. 3 Start DLS 7.00 TFO -1 7.1
9 13300.00 88.81 14.17 6638.94 6825.85 7843.47 7.00 -117.00 10372. 7 Start DLS 7.00 TFO 85 00
10 13575.00 90.52 33.34 6640.58 7076.36 7953.72 7.00 85.00 10627. 7 Start DLS 7.00 TFO -1 71
11 13850.00 84.96 14.89 6651.51 7325.95 8065.54 7.00 -107.00 10883.3 Start DLS 7.00 TFO 90 00
12 14050.00 85.11 28.94 6668.91 7510.33 8139.72 7.00 90.00 11066.6 Start DLS 7.00 TFO -9 .01
13 14175.00 85.17 20.16 6679.52 7623.51 8191.42 7.00 -90.00 11182. 4 Start DLS 7.00 TFO -1 5.1
14 14575.00 66.10 358.87 6779.39 8000.94 8257.82 7.00 -135.00 11496. 8 Start DLS 2.00 TFO -110'1
15 14975.00 64.96 350.17 6945.36 8362.88 8223.21 2.00 -100.00 11728. 4 Planned TD at 14975. 0
Mean S
ER
I U SES
8750
c 8400
i-
IR --'T I TIO Pl Died TDeI 11497500
IR JS'l It ,< IR 211.1{01 Farlt3
Ik 31 Iroa
IR aJ/IR- LI OI�
r.
;.
3 SOSU
C
S DIS200 T10 10000
h
IR _3L1_T08
ilj'
M 7700
..
+
I IR-23LI Fault
.._
73501
IR-23LI T07
Surt OLS ]OtI TFO -135.00
O ,
IR -23L] D6 _
DOW
_T06
__
IR-13LI TOS
_
SYgrt DIS].00'T£0-9000
.:
IR 'LI T04----
Start DtS]OD TF09DD0
i 6650
- -
IR -333 1-1 T03-'
�Srurt DLS700500
SStartDIS 7000 TfrO TFO 85
6300
_
-L
IR -210 IR 2:1-1 Fault -"
-"'-
_ San DLS200TF0-11 00
- IR -23 CTD POI,,-
F 1. nl, SIen DLS ].00 TFO 6400
5950-
-
- -
IR -23 LI TO
IR -23L1 -T01
Stan DLS 700'1 FO -88.00
5600
Stan B Id 4500KOP"'Stan
8100
--
1
DLS700TFO
5250
... �3 Q'TDR
,on -L
_{
TIP'
�Wcst(-)/East(+) (350 usft/in)
Vertical Section at 45.00° (100 usft/in)
✓ KUP INJ 1R-23
ConoleoPhillipS
Weli Attributes Max
Angle&MD TD
Aa4I81fID
WollboreAPIIIIWI Force Name Wellbore Blalus 11"',
5062fl2229999 KUPARUK RIVER UNIT INJ
clMO kK81 %IDIm111K01
6510 3,00000 12,180-0
Cammenl JH351ppml OM Annotation Eno Odle
SSSV: TRW` OnW0: 1/6/1992
KB�Grtl 1X1 flip Releau usesIftm.lumrols3:H<I
42.99 tOT11991
PM
noUlion DepIh IM1NB1 EnO Dale noYtion Lasi By 17 Dale
Last Tag'. SLM 11,(1 884015 Rev Reason'. PULLED FRAC SLEEVE IeXallf 12/304016
Gazing Strings
Oast, .emotion ooltnl mllnl 1"(191 BemeplhlnKin Sel Depth IN01...ohuln(._Gratle Top Th.
CONDUCTOR 16 15.062 44.0 123.0 123.0 62.50 Hi0 WELDED
WVM'EB''E9d
Casing Oesorienon ODlInl ID IIn1 ToplaKel -cei WrI633I Bet Depth ll072* Wtllen ll...Grade TOP ThreM
SURFACE 95/8 8921 42.0 6,3308 3600- BTC
Casing Description OOlin1 )Olin Top IHK2 BelOepthlkKO) "'"TIh IND .. WVLen 11... GMe Top TMeatl
I" vi,
PRODUCTION ] 6.2]6 292 II.TJZ] ],002.5 26.00 1-80 NSCC
Tubing Strings
Turn.Description String Me.. lODn1 Top lune) Bel Depth lX..sel Depth TVD)t... wlpelX vraEa Topeonnecbon
TUBING WO 314 2.992 383 11,609.9 6]26.] 930 J-55 EUEABMOD
Completion Details
Nominal ID
Top (final Top OVD)INKe1 Top Incl(') Ibm one Com lint
CONOUCTDR: d461Z3B
38.3 310 0.01 HANGER FMC GENIV TUBIN HANGER 3.500
1,8160 1.i 3909 SAFETY VLV CAMCO TRDP-1A SAFETY VALVE 2.812
11529.9 6,6890 61.87 NIPPLE OTIS x SELECTIVE LANDING NIPPLE 2.813
11,567.5 6,706.7 61.89 PER BAKER PBR 3.000
11,581.2 6,713.1 61.90 PACKER BAKER He RETRIEVABLE PACKER 2.890
sA£ETr Wv+e+Bn
11577-5 6,72. 1. 1 NIPPLE OTIS RN NIPPLE NO GO 2750
11,609.2 6726.3 61.88 SOS BAKER SHEAR OUT SUB 2.992
Perforations & Slots
Shot
Dens
DKLIF[ApAJ
Tap IXKeI
BM(Been
TapINDI
(IIKRI
BIm IN01
e1Ke)
Zone
IshobH
Odle
tI
Type
Cam
11,]10.0
11,JJ0.0
6,]]4.1
6,803.1
C-2.0-1,
too"92
10.0 IPERF
4.5" Cog Gun', NO degp6
UNITS, 1R
3
Stimulations & Treatments
Top MDo Blm
Ceplll OepM
De
Top (TV
BIm INOI
'NiIn
1111
kXBI
Type
OaM
Lam
11710.0 11,770.D
6774.1
6,8W.1
"ED
ID/11/1he
PUMP 12,G69N OF 20140 SANG AND 2,490p OF
5
ROCKSALT. INITIAL ISIP 27M PSI, FINALISIP
14 PSI.
Man4lral Inserts
n
Mi
B O0.FALE420E.33]B
on
N Tap IRKBI
ioPiKER
1flKBI
MeU
MM01
OD(p)
OnesView
Type
ILenthn"I
Type
Port ln(Run
Ipso
RunDoneCom
3,250]
2,d93.2
CAMCO
KBUG-
1GAS
SIV
LIFT OMY
BK
0.0
0.000 6010/])1992
M
2 11 484 .1
6667.5
0IS JLBD
11/2
1 GAS LIFT I DMV
RM
0.000 0.0
4/1/1992
Notes: General & Safety
EndDme Anra.bon
GA6. UFT: 11.dG.5
10/192010 NOTE. View Schematic w/ Alaska Schemallc9.0
/19/2013 NOTE PROD CSG RKB per RIG DETAIL SHEET
NIPPIE: 1151.9
PPCKEX', 11,5613
NIPPLE: 11,59].4
IDE, II B]9.3
XPBD, I1.]t0.p
1
IPE0.F. 11 ]10R11,1N0
E
PROp1 N0N:M21i,IP]
16" 62# H-40 shoe
@123'MD
9-5/8" 36# J-55 shoe
@ 6331' MD
KOP @ 11,680' MD
via 7" HEW
FC sand perfs
11,710' - 11,770' MD
7.126# L-80 shoe @
12,178' MD
1 R-23 Proposed CTD Schematic -
3-1/2 Cameo TRDP-1A SSSV at 1816' MD
3-1/2" 9.3# J-55 EUE 8rd Tubing to surface
3-1/2" Cameo gas lift mandrel at 3251'
3-1/2" OTIS gas lift mandrel at 11,485'
OTIS X Selective landing nipple @ 11,530' MD (2.813" ID)
Baker 3-1/2" PBR at 11,568' MD
Baker HB packer at 11,581' MD (2.89" ID)
OTIS XN-nipple at 11,598' MD (2.75" min ID, No -Go)
3-1/2" SOS at 11,609' MD
1R -23L1-02 Wp02
TD @ 17,000' MD
Top of Liner Q 11605' MD IR43L1-01 Wp03
TD � 16,520' MD
Oil & Weler T/acerro Pups OH -Anchor &Ilei @ 12,500' MD
1R -23L1 Wp02
TD ®14,975' MD
OH -Anchor Billet @ 14.100' MD
Loepp, Victoria T (CED)
From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Sent: Thursday, September 26, 2019 8:54 AM
To: Loepp, Victoria T (CED)
Cc: Ohlinger, James J; Knock, Grace E
Subject: RE: [EXTERNAL]KRU 1R-231-1, 1R-231-1-01, 1 R-231-1 -02(PTD 219-128, 219-129, 219-130)
Hello Victoria,
We are planning on running blank liner from 11,605' MD to 13,850' MD which will straddle the anchored billet and block
off any production from the first two delineation laterals. The blank liner is expected to block off flow from the first two
laterals, abandoning them without cement.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Sent: Thursday, September 26, 2019 8:14 AM
To: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Subject: [EXTERNAL]KRU 1R-231-1, 1R-231-1-01, 1R-23L1-02(PTD 219-128, 219-129, 219-130)
Ryan,
For the two delineation laterals that are unlined, will they be produced or abandoned without cement? How long is the
blank portion of the 11R-231-1-02? Will this blank liner prevent any flow from the other two laterals?
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria.Loeoo(a)alaska.aov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria.Loeoo@alaska.gov
Davies, Stephen F (CED)
From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Sent: Monday, September 16, 2019 11:18 AM
To: Davies, Stephen F (CED)
Subject: RE: [EXTERNAL]KRU 1R-23 (PTD 191-101; Sundry 319-421) - Question
Steve,
That is correct. The high expansion wedge is non -isolating.
Regards,
Ryan McLaughlin
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-265-6218 Cell: 907-444-7886
700 G St, ATO 670, Anchorage, AK 99501
From: Davies, Stephen F (CED) <steve.davies@alaska.gov>
Sent: Monday, September 16, 2019 11:16 AM
To: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com>
Subject: [EXTERNAL]KRU 1R-23 (PTD 191-101; Sundry 319-421) - Question
Ryan,
Could you please confirm that the proposed High Expansion Wedge will not isolate the existing C -sand perforations in
KRU 1R-23?
Thank you,
Steve Davies
AOGCC
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission
(AOGCC), State of Alaska and is for the sole use of theintendedrecipient(s). It may contain confidential and/or privileged information. The unauthorized review, use
or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding
it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviest@alaska.gov.
TRANSMITTAL LETTER CHECKLIST
WELL NAME: / �� I)C- 2 L L I
PTD: Zl —G Zb
Development _ Service Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: lea cuc itrt ✓ POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
LATERAL
The permit is for a new wellbore segment of existing well Permit
No. q - j,�>API No.
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50-
_-_) from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are fust caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. hi addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL -490100
Well Name: KUPARUK RIV UNIT 1R-231.1 Program pEV Well bore seg
PTD#:2191280 Company ConocoPhillios Alaska Inc Initial Class/Type
DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑
Administration
1
Permit fee attached ........ . . . . . . .... . . . . . . . .... . _ .... _
_ NA
2
Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ .. _ _
Yes
_ _ _ _ Lateral well branch with KOP, top prod interval, and TD in ADL 025627.
3
Unique well. name and number - - _ - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
4
Well located in a defined pool _ _ _ . _ - -
Yes
_ .. _ Kuparuk River Oil Pool, govemed by Conservation Order No. 432D
5
Well located proper distance from drilling unit boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ ______
Yes
_ _ . Conservation Order No. 432D has no interwell- spacing -restrictions, Wellbore will be more than 500' _
6
Well located proper distance from other wells _ _ _ _ _
Yes
_ _ from an external property line whereownership or landownership. changes. As proposed,. well branch
7
Sufficient acreage available in drilling unit- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
_ _ will conform to spacing requirements.
8
Jf deviated, is. wellbore plat included - - - - - - _ - - _ _ - - - _ - - _ . _
Yes
9
Operator only affected party. - - - - - - ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______ _ _
Yes
10
Operator has appropriate bond in force _ _ ... _ _ _ .. _ _
Yes
_
11
Permit can be issued without conservation order. _ _ _ _ _ _
Yes
Appr Date
12
Permitcan be issued without administrative approval _ _ _ _ _ _ _ ..
Yes
SFO 9/23/2019
13
Can permit be approved before 15 -day wait_ _ _ _ _ _ _ _
Yes
_
14
Well located within area and strata authorized by. Injection Order # (put. 10# incomments)(For-
NA
15
All wells within 114 -mile area of review identified (For service well only)_ __ _ _ _ _ _ _ _ _
NA
16
Pre -produced injector; duration of pre production less than 3 months. (For service well only)
NA___
_ _ _ _ _ _ _ _ _ _
17
18
Nonconven, gas conforms to AS31,08 030([.1.A),([.2.A-D) _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ __
Conductor stringprovided__...... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _
NA...
NA- _ -
- .... Conductor set.for-KRU_ 1R-23.
Engineering
19
Surface casing. protects all known USDWs _ _ _ _ _ ... _ ... _ ...
NA _ _
_ _ _ . Surface casing set for KRU IRr23.
20
CMT. vol adequate to circulate on conductor _& surf_csg . . . . . . ..... . . ...... .
NA_ _ _
. _ _ .. Surface casing set and fully cemented
21
CMT -vol adequate to tie-in long string to surf csg. _ _ _ _ .. . . . . .. . .... .
NA
22
CMT -will cover all known productive horizons_ _ _ _ _ _ _ _ _________ _ __ _ __ _ _ _ _ _
No.....
_ _ _ Productiveintervalwill not be completed; unlined delineation lateral; will be abandoned
23
Casing designs adequate for CJ. B j& permafrost _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
24
Adequate tankage. or reserve pit _ _ _ _ _ _ _ _ _ ... _
Yes
_ _ Rig has steel tanks; all. waste to approved disposal wells..
25
If are -drill, has a 10-403 for abandonment been approved _ _ _ _ _ _ _ -. _ _ .
NA_
26
Adequate wellbore separation proposed _ _ _ _ _ _ _ _ _ _ .... _ .....
Yes _
_ Anti -collision analysis complete; no major risk failures
27
If.diverter required, does it meet regulations _ _ _ _ _ _ _ _ _ _ _ _ _
NA -
- -
Appr Date
28
Drilling fluid program schematic & equip list adequate_ _ ... ... _ _ _
Yes .
_ Max formation pressure is 3515 prig(10 ppg EMW); will drill w/ 8.6.ppg EMW and maintain overbolw/ MPD-
VTL 9/24/2019
29
J30PEs, do they meet regulation _ _ _ _ _ .... . . . ... . . .
Yes
- - -
30
BOPE-press rating appropriate; test to -(put prig in comments)_ ___ _ _ _ _ _ _ _ _ _ _
Yes .
_ _ _ MPSP is 2841 -prig; will test BQPs to 3500 prig...
31
Choke manifold complies w/API RP -53 (May 84)- - _ ..... _ _ _ ... _
Yes
32
Work will occur without operation shutdown- - - - - - - - - - - - - - - - - - --- - - - - - - --
Yes
33
Jr, presence of H2S gas. probable- - - - - - - - - -- - - - - - - - - - - - - - - - - _ _ . - _ - -
Yes
... _ _ H2S measures required,
34
Mechanical condition of wells within AOR verified (For. service well only) _ _ _ _ _ _ ..... _
NA
35
Permit can be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ ___ ___ _ _ _ ___ _
No..
_ Wells on.1 R -Pad are H2,S-bearing. H2S measures required.
Geology
36
Data presented on potential overpressure zones .. _ _ ... ... .. _ .
Yes
_ _ _ Expected reservoir pressure is 10.0 ppg, with soml potential of higher pressure due togas
Appr Date
37
Seismic analysisi of shallow gas zones _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
NA
_ _ _ _ injection within this area. Well branch will. be drilled using 8.6 ppg mud, a coiled -tubing dg, and
SFD 9/23/2019
38
Seabed condition survey -(if off -shore) ........ . . . . . . . .... . . ... .. . .
NA ..
_ _ _ _ managed pressure drilling technique to control formation pressures and. stabilize shale sections. by...
39
Contact namelphone for weekly_ progress reports [exploratory only], _ _ _ _ _ _ _ _ _ _ _ _ _
NA
_ _ _ _ maintaining a constant pressure gradient of about 11.8. ppg EMW...
Geologic Engineering Public
Date: Date Date
Commissioner: Commissioner: Commissioner