Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-128DSR-4/9/2020 SFD 4/10/2020VTL 4/17/20 Permit to Drill 2181280 MD 11711 TVD REQUIRED INFORMATION DATA SUBMITTAL COMPLIANCE REPORT 2/10/2020 Well Name/No. KUPARUK RIV UNIT 1R-231-1 13 Z Operator ConocoPhillips Alaska, Inc. 6773 Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP Mud Log No Samples No V DATA INFORMATION List of Logs Obtained: GR/Res Well Log Information: Log/ Electr Data Digital Dataset Log Log Run Interval Type Med/Frmt Number Name Scale Media No Start Stop Log 31483 Log Header Scans 0 0 ED C 31483 Digital Data ED C 31483 Digital Data ED C 31483 Digital Data ED C 31483 Digital Data ED C 31484 Digital Data ED C 31484 Digital Data ED C 31484 Digital Data ED C 31484 Digital Data Log 2191280 KUPARUK RIV UNIT 1R-231-1 PB2 31484 Log Header Scans 0 0 Log 31485 Log Header Scans 0 0 ED C 31485 Digital Data ED C 31485 Digital Data ED C 31485 Digital Data ED C 31485 Digital Data ED C 31585 Digital Data 11088 14088 ED C 31585 Digital Data ED C 31585 Digital Data API No. 50-029-22200-60-00 UIC No Directional Survey Yes (from Master Well Data/Logs) OHI CH Received Comments 2191280 KUPARUK RIV UNIT 1R -23L1 PB1 LOG HEADERS 11/20/2019 Electronic File: 1 R-231-1 PB1 EOW-NAD27.pdf 11/20/2019 Electronic File: 1R-231-11'61 EOW - NAD27.txt 11/20/2019 Electronic File: 1R-230PB1 EOW NA083.pdf 11/20/2019 Electronic File: 1R-23L1PB1 EOW NAD83.txt 11/20/2019 Electronic File: 1R-231-1 PB2 EOW - NAD27.pdf 11/20/2019 Electronic File: 1R-231-1 PB2 EOW - NAD27.txt 11/20/2019 Electronic File: 1R-231-1 P82 EOW NAO83.pdf 11/20/2019 Electronic File: 1R -23L1 P82 EOW NAD83.txt 2191280 KUPARUK RIV UNIT 1R-231-1 PB2 LOG HEADERS 2191280 KUPARUK RIV UNIT 1R-231-1 PB3 LOG HEADERS 11/20/2019 Electronic File: 1R-231-1 P83 EOW - NAD27.pdf 11/20/2019 Electronic File: 1R-231-1 PB3 EOW - NAD27.txt 11/20/2019 Electronic File: 1R-231-1 PB3 EOW NAD83.pdf 11/20/2019 Electronic File: 1R-2311 P83 EOW NAD83.bd 12/5/2019 Electronic Data Set, Filename: 1R-231.1 P81 GAMMA RES.las 12/5/2019 Electronic File: 1R-23L1P812MD Final.cgm 12/5/2019 Electronic File: 1R-23L1PB1 51VID Final.cgm AOGCC Page 1 of 5 Monday, February 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 2/10/2020 Permit to Drill 2191280 Well Name/No. KUPARUK RIV UNIT 1R-2311 Operator ConocoPhillips Alaska, Inc. API No. 50-029.22200-60.00 MD 11711 TVD 6773 Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP UIC No ED C 31585 Digital Data 1215/2019 Electronic File: 1R-231-1 PB1 5TV15SS Final.cgm ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB1 21VID Final.pdf ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-231-11381 51VID Final.pdf ED C 31585 Digital Data 12/512019 Electronic File: 1R-23L1PB1 5TVDSS Final.pdf I ED C 31585 Digital Data 12/512019 Electronic File: 1R-231-1 P131 EOW - NAD27.pdf I ED C 31585 Digital Data 12/5/2019 Electronic File: 1R -23L1 P81 EOW - NAD27.tx1 ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB1 Final Surveys 14088 TD.csv ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-23L1PB1 Final Surveys 14088 TD.xlsx ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-23L1PB1 Survey Listing.txt ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB1 Surveys.txt ED C 31585 Digital Data 12/5/2019 Electronic File: 1R - 23L1 PB1_25_tapescan_BHI_CTK.txt ED C 31585 Digital Data 12/5/2019 Electronic File: 1R - 23L1 PB1_5_tapescan_BHI_CTK.txt ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-23L1PB1_output.tap ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB1 2MD Final.cgm.meta.tif ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-23L1PB1 5MD Final.cgm.meta.tif ED C 31585 Digital Data 12/5/2019 Electronic File: 1R-231-1PB1 5TVDSS Final.cgm.meta.tif ED C 31586 Digital Data 11088 13010 12/5/2019 Electronic Data Set, Filename: 1R-23LIP82 GAMMA RES.Ias ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1PB2 21VID Final.cgm ED C 31586 Digital Data 12/5/2019 Electronic File: 1 R-231-1 PB2 51VID Final.cgm ED C 31586 Digital Data 12/5/2019 Electronic File: 1R -23L1 PB2 5TVDSS Final.cgm I ED C 31586 Digital Data 1215/2019 Electronic File: 1R-231-1 PB221VID Final.pdf ED C 31586 Digital Data 12/5/2019 Electronic File: IR -231-1 P8251VID Final.pdf ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1PB25TVDSS Final.pdf ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-23111PB2 EOW - NAD27.pdf AOGCC Page 2 of 5 Monday, February 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 2/10/2020 Permit to Drill 2191280 Well Name/No. KUPARUK RIV UNIT IR -231-11 Operator ConocoPhillips Alaska, Inc. API No. 50-029-22200.60.00 MD 11711 TVD 6773 Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP UIC No ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB2 EOW - NAD27.txt ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB2 Final Surveys.csv ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-23L1PB2 Final Surveys.xlsx ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-23L1PB2 Survey Listing.txt ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1 P82 Surveys.bd ED C 31586 Digital Data 12/5/2019 Electronic File: 1R - 23L1 PB2 _25_tapescan_BHI _CTK.txt ED C 31586 Digital Data 12/512019 Electronic File: 1 R- 231-1 PB2_5_tapescan_SHI_CTK.txt ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB2_output.tap ED C 31586 Digital Data 12/5120119 Electronic File: 1R-231-1 PB2 2MD Final.tif ED C 31586 Digital Data 12/5120119 Electronic File: 1R-231-1 PB2 51VID Final.tif ED C 31586 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB2 5TVDSS Final.tif ED C 31587 Digital Data 11088 13760 12/5/2019 Electronic Data Set, Filename: 1R-23L1PB3 GAMMA RES.las ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB32MD Final.cgm ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1PB3 5MD Final.cgm ED C 31587 Digital Data 12/5/2019 Electronic File: 1 R-231-1 P83 5TVDSS Final.cgm ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB32MD Final.pdf ED C 31587 Digital Data 12/5120119 Electronic File: 1R-231-1 PB35MD Final.pdf ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3 5TVDSS Final.pdf ED C 31587 Digital Data 12/5/2019 Electronic File: 1R -23L1 PB3 Surveys @ 13760 TD Unconfirmed.csv ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3 Surveys @ 13760 TD Unconfirmed.xlsx ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3 EOW - NAD27.pdf ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3 EOW - NAD27.txt ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 P83 Survey Listing.txt ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3 Surveys.txt ED C 31587 Digital Data 12/5/2019 Electronic File: 1R - 23L1 PB3_25_tapescan_BHI_CTK.txt AOGCC Page 3 of 5 Monday, February 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 2/10/2020 Permit to Drill 2191280 Well Name/No. KUPARUK RIV UNIT 1R -23L1 Operator ConocoPhillips Alaska, Inc. API No. 50-029.22200-60-00 MD 11711 TVD 6773 Completion Date 10/28/2019 Completion Status SUSP Current Status SUSP UIC No ED C 31587 Digital Data 12/5/2019 Electronic File: 1R- Release Date: 9/27/2019 Description 231-1 PB3_5_tapescan_BHI_CTK.tM ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3_output.tap ED C 31587 Digital Data 12/5/2019 Electronic File: 1 R -23L1 PB32MD Final.cgm.meta.tif ED C 31587 Digital Data 12/5/2019 Electronic File: 1 R-231-1 PB35MD Final.cgm.meta.tif ED C 31587 Digital Data 12/5/2019 Electronic File: 1R-231-1 PB3 5TVDSS Final.cgm.meta.tif Well Cores/Samples Information: Sample Interval Set Name Start Stop Sent Received Number Comments INFORMATION RECEIVED Completion ReportDY Directional / Inclination Data I r I Production Test Information Y / AA Mechanical Integrity Test Informations YY Geologic Markersrrops D Daily Operations Summary COMPLIANCE HISTORY Completion Date: 10/28/2019 Release Date: 9/27/2019 Description Date Comments Comments: AOGCC Mud Logs, Image Files, Digital Data Y /� Core Chips Y / MIL Composite Logs, Image, Data Files Core Photographs Y C--)/®A Cuttings Samples Y Laboratory Analyses Y& J�/ Page 4 of 5 Monday, February 10, 2020 DATA SUBMITTAL COMPLIANCE REPORT 2/10/2020 Permit to Drill 2191260 Well Name/No. KUPARUK RIV UNIT 1R-231-1 MD 11711 TVD 6773 Co n Date 0/28/2019 Compliance Reviewed By: Operator ConocoPhillips Alaska, Inc. API No. 50.029-22200.60-00 Completion Status SUSP Current Status SUSS / UIC No Date: O' 2-0 Za AOGCC Page 5 of 5 Monday, February 10, 2020 Baker at PRINT DISTRIBUTION LIST Hughes COMPANY ConocoPhillips Alaska, Inc. WELL NAME IR-23LIPB1 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider@bakerhughes.com STATUS Final COMPANY 2 19 128 31585 se sign and return one copy of this transmittal form to: ocoPhillips Alaska, Inc. I Osterkamp (WNS Petroleum Technician) G Street. 'forage, Alaska 99510 LOG TYPE GR - RES LOG DATE October 22, 2019 TODAYS DATE December 3, 2019 Revision Replacement: No Details: Rev. Requested by: ADDRESS (FEDEX WILL NOT DELIVER TO Po BOX) PERSON ATTENTION 4 - BP North Slope. EOA, PBOC, PRB-20 (Office 109) Ii Wells Admin Brenda Glassmaker & Peggy O'Neill 1900 E. Benson Blvd. Anchorage, Alaska 99508 FIELD FINAL CD/DVDFINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINT # OF COPIES I#OFCOPIES # OF COPIES pi 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico ATO 708 1700 GStreet RECEIVED Anchorage, AK 99510 DEC 0 5 2019 3 Exxon Mobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska -AOGCC 1 1 Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 ON R - Division of Oil & Gas *•* 1 Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR M 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 2 0 0 Baker $ PRINT DISTRIBUTION LIST Hughes COMPANY ConocoPhillips Alaska, Inc. WELL NAME 1R-23L1PB2 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider@lakerhuahes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION V I BP North Slope. EOA, PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Beason Blvd. Anchorage, Alaska 99508 v_ 219128 31585 Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp (WNS Petroleum Technician) 700 G Street. Anchorage, Alaska 99510 Ito acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE October 24, 2019 TODAYS DATE December 3, 2019 Revision Details: Rev. Requested by: --- FIELD I FINALCD/DVD FINAL ATO 708 PRELIM LOGS (las, dlis, PDF, META, SURVEY REPORT LOGS 3 ExxonMobil, Alaska CGM, Final Surveys) (Compass) # OF PRIN ur rKIN # OF COPIES 1901 -COPIES # OF COPIES 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 E 'V /► �i 700 G Street `a �p DEC Anchorage, AK 99510 p 5 2019 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 4 State of Alaska - AOGCC 1 1 Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 DNR- Division of Oil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR BP Exploration (Alaska)Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 2 0 0 Baker S PRINT DISTRIBUTION LIST Hughes COMPANY ConocoPhillips Alaska, Inc. WELL NAME 1R-23L1PB3 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska 219128 31587 Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp (WNS Petroleum Technician) 700 G Street. Anchorage, Alaska 99510 Ito acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE October 27, 2019 AUTHORIZED BY Patrick Rider EMAIL Patrick. Rider@bakerhughes.corn TODAYS DATE December 3, 2019 Revision STATUS Final Replacement: No Details: Rev. Requested by: --- COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION lu 1 BP North Slope, FOA, PBOC. PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmakcr & Pegg) O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 ConocoPhillips Alaska Inc. Atm: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 3 ExxonMohil, Alaska Attn: Lynda M. Yaskeil and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 FIELD I FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, SURVEY I REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES # OF COPIES 1� 4 4 4 4 State of Alaska - AOGCC i Attn: Natural Resources Technician 11 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** .Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6�14P Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 ,900 E. Benson Blvd. Anchorage. Alaska 99508 fel G I73oT3i1M.I&MU01 DEC 0 5 2019 AOC;rr, 0 1 2 0 0 STATE OF ALASKA ALA, ry OIL AND GAS CONSERVATION COMMIS. iON REPORT OF SUNDRY WELL OPERATIONS NOV 2 7 2019 1. Operations Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Pull Tubing ❑eo Us lutdown 0 Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ erforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: ❑ 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: ConocoPhillips Alaska, Inc. Development ❑ Stratigraphic❑ Exploratory ❑ Service ❑ 219-128 3. Address: P. O. Box 100360, Anchorage, Alaska 6. API Number: 99510 50-029-22200-60-00 7. Property Designation (Lease Number): 8. Well Name and Number: KRU 1 R -23L1 ADL 25627 ALK 2560 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Kuparuk River Field / Kuparuk River Oil Pool 11. Present Well Condition Summary: Total Depth measured 12,180 feet Plugs measured None feet true vertical 7,004 feet Junk measured None feet Effective Depth measured 12,178 feet Packer measured 11,581 feet true vertical 7,003 feet true vertical 6,713 feet Casing Length Size MD TVD Buret Collapse CONDUCTOR 79 feet 16 123' MD 123' TVD SURFACE 6,289 feet 9 5/8 " 6,331' MD 4072' TVD PRODUCTION 12,149 feet 7 12,178' MD 7002' TVD Perforation depth: Measured depth: 11710-11770 feet True Vertical depth: 6774-6803 feet Tubing (size, grade, measured and tme vertical depth) 3.5 " J-55 11,610' MD 6,727' TVD Packers and SSSV (type, measured and true vertical depth) PACKER- BAKER HB RETRIEVABLE PACKER 11,581' MD 6,713' TVD 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: Shut -In e e e e Subsequent to operation: Shut -In a e e e 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) 15. Well Class after work: Daily Report of Well Operations O Exploratory ❑ Development O Service ❑ Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil ( Gas L] WDSPL ❑ Printed and Electronic Fracture Stimulation Data EDGSTOR ElWINJ ❑ WAG [_1GINJ ❑ SUSPfI� 1&9+ SPLUG❑ 17. 1 hereby certify that the foregoing is true and correct t0 the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-489 .I4 M ¢S li+xey rr^^ Contact Name: Ryan McLaughlin '/vnc� Authorized Name: James Ohlin er 7"^ 0'V">" Contact Email: ryan.mclaughlin@cop.com Authorized Title: Staff CTD En Ineer C /�p Contact Phone: (907) 265-6218 t/ 2 4 / Authorizetl Si nature: Dale: Form 10404 Revised 4/2017 Y7—L, /2 //6// 9 ,f1WI617 IBDMS i'DEC 011019 Submit Original Only KUP IN WELLNAME 1R-23 WELLBORE 1R-23 /• -' ' Well Attributes Max Angle & TD �OflOCOPiII��(p5 FreleName We11EarcAPYUWI Well�ea... Icl1'I N (.Be) ....pen.) AIBSk,'1. r1C. NI IPARIINFIVFRIINIT 5nnJ9JJ2nnnn INI F11_I 3000000 121600 SSSV'. TROP le-z"Ieaamfinal eAM Last Tag Vueoleurmeelnon) Annotation aepxi(KKBI End Odle WNIWre last Moe ay Last Tag SW I 11)350 lal 1R-23 inninal -------- - -- -- - Last Rev Reason Annotation 1 Enc naR WeIIGore last Moe By rvarvcsR. M6 RAV Reason: Set WniDstoch 9282019 1R-23 famaj 1 1 Casing Strings ILL Cavae Descnotlan ODtlnl )DMI Too INKIN Se137,11 Dmill Set Noun RV.1 IMLen If G,nee rap Tnreae CONDUCTOR 16 15.06 446 123.0 123.0 62.50 HAO WELDED ,Pme, Romm"ein .Dual ID lin) T.P(M(6) Stl Nal must Set DN. Uvox..WIILen x... Gretle top Tnreatl SURFACE 95M 8.92 420 6,330.8 4,0nA 36.00 J-55 8TC cmi conamnionOD 11.1 1D IIn) 101puni) Set..ph III SN DanielUIRA. YRILen x... Gretle Top Tnreatl PRODUCTION 7 6.28 29.2 12,1777 7,002.5 26.00 L-80 NSCC FUND) 8.440-15.0 1 Tubing Strings TunlnA DeenlpMe Str1I No IDllnl top lKKa) Set Depth lrt.. set..On Tv.f .. AT.) Do Tap conn -.a TUBING WO 3112 2.99 383 11,609.9 672fiJ 9.30 J-55 EUEABMOD Completion Details sAI YLV;'em. Top RVD) Topmcl Nominal Top lrtMe) InKED p) Item Dan com ID (in) 38.3 38.3 0.01 HANGER FMC GEN IV TUBING HANGER 3.WI 1,8160 1,7194 3909 SAFETYVLV CAMCOTROP-IA SAFETYVALVE 2.812 11,5299 6,689.0 61.87 NIPPLE OTIS% SELECTIVE LANDING NIPPLE 2.813 GAS UFT.%a 11,57.5 6,]067 61.89 PBR BAKER PBR 3.000 11,5812 6,713.1 61.90 PACKER BAKER HB RETRIEVABLE PACKER 2.890 11,597.5 6,720.8 61.91 NIPPLE OTIS%N NIPPLE NO GO 2.750 11,609.2 6,726.3 fit 88 SOS BAKER SHEAR OUT SUB 2992 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.( Top I,.) loci Top(nKB IRKS) IT,, P) I Des Com Run Data ID (in) 11,682.0 6,760.] 61.66 WHIPSTOCK Nonnern BAulions -700 Hign Expansion Wedge. 91282019 0000 I Se14 6 degrees ROHS. w1 RA tag at 11689' p' below top of HEW). GAL 8.8Max OD 2625' suRFAce.42oa,Aaoe Perforations 8 Slots sbt Dena To,(Ti sun RVDI (snonm Too (ft.) Bim ixKB) Ban iIKS) LimFM 2me Data ) iype Com 1 IiIIVR 11)]0.0 6,]]41 18,8031- -,U I 11511992 10.0 )PERF 45" Csg 60 deg eg pn NumUET', 11 <ea1 B. 1R-23 Frac Summary sam Duh P.Wani DevPned Qn) PmPWM In Fmmanan (in) 1&1111995 .N. Stan. Tap Daplhoppl) BLlnRWFIUWSysh vol cean lneq Vosurye xlpvle.u.,e 1 1&111995 11,]11( 1,7M0 Mandrel Inserts sr nI H Top RVI) Topples) "a) Mab Model Do (in) Valve loco Ports. moat. Sery Than Type (in) )pep Run Dale Com P9RI 11'eszs 3,250.] 2,493.2 CAMCO K U - 1 GAS LIFT DMY BK 000000 1&2]/1992 M PACKER: 11.pis 2 11484.5 6.66].5 OTIB DBD 1 1112 IGAS LIFT OMY RM 0.000 0.0 d1111992 Notes: General & Safety End Oac Annotation MPPIf; 11,5875 9/1 912 01 3 NOTE'. PROD CSG RKB per RIG DETAIL SHEET 11/1412019 NOTE'. View a0en is wl AlasW SAnemai0 AOs, n W33 WXIPSTOCK 11.6920 SPaD 1111..11 )PERF', U,71.. me PRODUCTION; A 2-1217y.i� an 0e�zt 0 Plee�o%Zo �eaLimaL aw.oaz'c� ® m oeancreL OW ,fi09'LL le 905 ,i6-£ (-O, N'01 ulw.g/'z)0W.9BS'LL 199lddlo-NX SLLO (01.9g'z) OW b9g'L L ism pod SH JayeS OW.899'LL1e NU Z/L-C my9S (01 „£L9'z) OW ,0£g'L L 0 alddlu Bulpual m1palaS X SILO ,9g9' LNs lmpuew WI 6e8 SLLO,.7in ,Lgzg le Immew ull6eB wwn..V&-9 wepns m awgn1 Wg ana gon we m -C OW ,9W le ASSS VL-dO Nl wweO LL-£ "'6i'a "r"T,�i°',6'T agewe4aS O11D 4uw1nD£z-8L aw Ru'zL 904609-1 ON .1 OW ,Da, LL - ALLU .ym puet0 OWd££9 ea4s 9w N96 „95'8 OW .ea 0 90430"9Z9.9L 1 R -23L1 OPERATION SHUTDOWN DTTM JOBTYP SUMMARYOPS START 10/26/19 DRILLING Drill ahead from 12,496 to 13,350' performing short, 400' wipers after every SIDETRACK 100' drilled and a long wiper to the window to clean up the 7" and tie in after 200' drilled. Experiencing some set downs @ the window - 50% of the time, spinning the bit and passing cleanly. Experiencing some WOB tugs and spikes @ 12,650'. Briefly stuck and packed off at the window on the way up hole on a wiper. Worked pipe, regained returns, continued on wiper trip. Drilled to a midnight depth of 13,350'. 10/27/19 DRILLING Drill ahead from 13,350' to 13,760' pulling short wipers every 100' drilled and SIDETRACK long wipers to the window every 200' drilled. On wiper to tubing tail, -6 WOB tug @ 12,626' and at 11,738' (partial pack -oft), stack pipe when attempting to RBIH, work pipe free going down, RBIH, pump sweeps circulate out, pull through window. Difficulty running back through window. Tie into tK1, RBIH unable to pass through window. POOH for clean out assembly. At surface PUD BHA #12, PD BHA #13, 0.5 °AKO motor w D331. RIH to midnight depth of 10,645' 10/28/19 DRILLING Continue to RIH from 10646'. Make multiple attempts to get through SIDETRACK window, setting down at 11,888'. Metal in returns. Attempt to RIH while varying pump rates and running speeds, 15-30 ft/min 0.25 to 1.8 bpm - no success. Wash down on tray to 11,687' PUH, cut pump, RIH clean to 11,711'. Seeing WOB spikes to 1 k. Attempt to PUH through window pumping, packed off and stuck. Worked pipe and pulled free. Attempt to RIH pumping 1.8 bpm, S/D 11,688. PU RIH dry, pass through clean. Ramp pumps to 1.8 bpm while RIH to 11,711'. Attempt to PUH, packed off and stuck. Work pipe - 1 hr total to 46 k -7 k WOB no luck. Work pipe to 80k. Three cycles pull free, well unloaded. Chase sweeps bottoms up. PUH on swab wiper PUD BHA #13. PU BHA #14 coilTrac with nozzle. RIH and clean up 7" with jetting passes and multiple sweeps. Chase sweeps out of hole turning well over to seawater and freeze protecting with 30 bbls of diesel from 2500' MD to surface. PUD BHA #14. Jet stack, blow down same, examine with Bore -O -Scope - good. Work rig down checklist. Rig release @ 10/29/2019 0:00 Note to file: KRU 111-231-1: Total depth set as 11,711' MD/6,773' TD by Steve Davies, senior petroleum geologist, AOGCC. Well was drilled to 13,760' MD, drillers POOH but could not get back below 11,711'. See daily drilling operational report for more details. MGuhl 2/25/2020 e>ta.v1116.■ V ilmay. STATE OF ALASKA NOV 2 2 2019 ALASKA OIL AND GAS CONSERVATION COMMISSION A � � WELL COMPLETION OR RECOMPLETION REPORT A ta. Well Status: oil[] Gas El SPLUG ❑ Other ❑ Abandoned ❑ Suspended E] 20MC 25.105 20MC 25.110 ' GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 1b. Well Class. Development Q ' Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Abend.: 10/28/2019 14. Permit to Drill Number / Sundry: 219-128 ' 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 10/18/2019 15. API Number: 50-029-22200-60-00 4a. Location of Well (Governmental Section). Surface: 4854' FNL, 144'FWL,Sec 17, T12N, R10E, UM ' Top of Productive Interval: 4574' FNL, 1803'FWL, Sec 9, T12N, RI OE, UM Total Depth: N/A 8. Date TD Reached: N/A 16. Well Name and Number: KRU 1R-23L1/PB1, PB2, PB3 9. Ref Elevations: KB:88' • GL: 45' . BF: 17. Field / Pool(s): Kuparuk River Field/ Kuparuk River Pool 10. Plug Back Depth MD/TVD: N/A 18. Property Designation. • ADL 25627, ALK 2560 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface. x- 539830 • y- 5991630 Zone- 4 ' TPI: x- 546719 y- 5997229 Zone- 4 Total Depth: x- N/A y- N/A Zone- 4 11. Total Depth MD7 :7 NIA 11,%/1' („.7-7:j 19. DNR Approval Number: LONS 83-134 12, SSSV Depth m/TVD- N/A '14 r& r 20. Thickness of Permafrost MD/TVD: / 1752' MD/1669-TVD ' 5. Directional or Inclination Survey: - Yes ❑� (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: • 11682' MD/6761' TVD ' 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16" 62.5 H-40 44.0" 123' 44' 123' 331 sx AS 1 9-5/8" 36 J-55 42.0' 6331' 42' 4072' 1300 sx PF E, 630 sx Class G 7" 26 L-80 40.0" 12178' 40' 7003' 380 sx Class G 24. Open to production or injection? Yes ❑ No Q If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): '5"� AT 16ft-TZd!' VERIFIED j{GJ 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 3-12" 11610' 11581'/6713' 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes E] No [2] Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) 1AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: N/A Method of Operation (Flowing, gas lift, etc.): UNABLE TO COMPLETE DRILL Date of Test: Hours Tested: Production for Test-- Test Period Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: Tubing Press. Casing Press: Calculated 24 -Hour Rate Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravity - API (corr) Form 10407 Revised 5/2017 v-rL- IZ/*/19 CONTINUED ON PAGE 2 Submit ORIGINIALonI ABDMS � NOV 2 6 2019 4\lz_;& /p 28. CORE DATA Conventional Co,�ls): Yes ❑ No ❑ ' Sidewall Cores: res ❑ No ❑ . If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology, and presence of oil, gas or water (submit separate pages with this form. if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested) Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1752 1669 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 11682 6761 information, including reports, per 20 AAC 25.071. Formation @ TPI - Kuparuk C3 1R-23L1 PB1 TO 14088 6726 Formation @ TD- Kuparuk D 1R-231-1 PB2 TD 13010 6741 Formation @ TD- B-2 1R-231-1 PB3 TD 13760 6735 Formation @ TD- B-3 Formation at total depth: N/A 31. List of Attachments: Daily Operations Summary, Definitive Survey, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, paleontological report, production or well test results, per 20 AAC 25.070. 32. I hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er a h Ci �'Yvi t,rr 3a,. cS 041rContact Name: Ryan McLaughlin 00 Authorized Title: Staff CTD Engine r Contact Email: R an.McLau hlin co .com Authorized 4+ Contact Phone: 265-6218 Signature: Date: 11121liq INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical with each reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this forth and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 1R-21 Current CTD Schematic 16" 6291-40 shoe 012Y MID 9.5/8" 36k J-55 shoe 6331' MD Ccand Pits 11,71a -11,770' MD r' 26#L-80 shoe 2,178' MD 3-12 Cam. TRDP-1A SSSV M 1816 MD 3.12" 9.3#J-56 EUE 8rd Tubing to surface 3-1/2" Camco gas lib mandrel at 3251' 3-12" OTIS gas lift mandrel at 11,485' OTIS X Selective landing nipple ®11,530' MD (2.813!'[D) Baker 3 Ia' PBR at 11,568' MD Baker 18 packer at 11,581' MD (2.88" ID) OTIS XN-nipple at 11,588' MD (2.75" min ID, NO-GO) 3.12" SOS at 11,609' MD R33L0] TD ®11P3.TW' Mp To -]3L1 in TO ®I3.o10' n O-23-1 rBIIMI®1;130'MA R3 L1PB1 TO ®16,008' MD ORNchor Bilet®1;190MO Uperations Summary (with Timelog Depths) Li 1 R-23 Rig: End Time NABORS Dur(hn 1.00 CDR3-AC Phase MIRU Op Code MOVE Adi"Cotle CTOP Time P -T-% Install P damaged Job: DRILLING Operation UII late, PJSM, perform oil procedure with rig CTC, SIDETRACK Start Depth CIKBJ End 0.0 Depth(RKB) 0.0 Time Log Start Time 10/15/2019 10115/2019 12:00 13:00 repeat with BOT external CTC, trim 2 7' section of coil for testing, prep coil 4.00 MIRU MOVE CTOP for P (#53723/16600), shipment. 1Begri n of reel nstall grapple into 0.0 0.0 10/15/2019 10115/2019 13:00 17:00 coil, remove inner reel iron and bulkhead, remove wash pipe, remove horses head counter, pin back INJH 10/15/2019 1.00 MIRU MOVE CTOP P7- counter. d �from INJH secure coUntab il to spolol, remove saddle 0.0 0.0 10/15/2019 17:00 18:00 TOM 5/2019 19:30 1.50 MIRU MOVE CTOP P clamps, reel in hanging bombayPrep to rdoor dike, remove king pmove reel, from rig, reff in, bombay doors, open doors 0.0 0.0 10/15/2019 18:00 10/15/2019 1.00 MIRU MOVE CTOP P Load out reel, secure onto truck. 0.0 0.0 10/15/2019 19:30 19:30 20:30 10/15/2019 21:30movesidedoorper 1011512019 1.00 1.00 MIRU MIRU MOVE MOVE 7 -0 -PP CTOP P Moven and spot reel for pick. load reel into rig. Rya out sump andsinsp inspect INJH, 0.0 0.0 0.0 0.0 10/15/2019 20:30 10/15/2019 21:30 2230dles,shim 10116/2019 1.50 MIRU MOVE CTOP P Install reel in Prep ereel � or 0.0 0.0 10/15/2019 22:30 00:00 1011612019 6.00 MI RU MOVE CTOP PStab stabbing C M/U Inner lreel iron, M/tor U p pressure 0.0 0.0 10116/2019 00:00 06:00 bulkhead, Nipple down BOPS, R/D 10/16/2019 6.00 MIRU MOVE RURD P cellar Complete hook Dup toasows & pull k trucks loff well, 0.0 O.D 10/16/2019 06:00 12:00 10/16/2019 4.50 MIRU MOVE MOB P jeep up modules Move from 1A -Pad to 1R -Pad 0.0 0.0 TOM 6/2019 1200 16:30 10/1612019 2.30 MIRU MOVE MOB P Spots sub &pits over 1R-23, lay mats 0.0 0,0 10/16/2019 16:30 18:48checklist, 10/16/2019 1.50 MIRU MOVE RURD P drop,0.0 secure landings, move shop & 1/2- 0.0 10/1612019 1848 20:18 Way house to 1R -Pad & spot up 10/16/2019 2.20 MIRU WHDBOP NUND -_ P Continue RU MP line t tangoocklst valvesNU BOPE, MU 0.0 0.0 1011612019 20:18 2230 1.50 MIRU WHDBOP RURD P Rig Accepted: 10/16 @ 22.30 hrs tiger-Conthank hardline, begin greasing all171t,t D.0 0.0 t 011612019 1011712019 22:30 00:00 valves post N2 blow -down, grease tree valves, swabs, & tango valves 10/17/2019 10/17/2019 0.80 MIRU WHDBOP RURD P vat eComsecomplete prcomepte Rtfor BOP tereasingsts 0.0 0.0 00:00 00:48 0.70 MIRU WHDBOP PRTS P lines, cycle off dPJSeli g choke, perform shell ed 0.0 00 10/17/2019 10/17/2019 00:48 01:30 10/17/2019 7.00 MIRU WHDBOP BOPE P Perform 3500 psi lhigh) bal BFaail Pass t onSR Psi low/ 0.0 0.0 10/17/2019 01:30 08:30 Witnessed by Lou Laubenstein of the AOGCC 10/17/2019 2.00 MIRU WHDBOP BOPE P Fill Coil test inner reel iron, pressure bulkhead, and stripper 0.0 0.0 j019 10:30 10/17/2019 1.00 PROD1 WHPST PRTS P Pressure test PDL's and TT line 00 00 019 11:302019 10/17/2019 1.00 PROD1 WHPST RGRP P 12:30 Paae 1117 Report Printed: 1116/2019 AWNUperations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Time End Time our (hr) Phase Op Code Activity Code Tme P -T -x P Operation PJSM.M/U BHA#1 with 1° WFT fixed (ftKB) End 0.0 Depth(ftKB) 76.9 10/17/2019 10117/2019 1.80 PROD1 WHPST PULD bend motor, 2.74" String reamer, and 1230 14:18 2.74" diamond window mill. PD BHA #1 10117/2019 10/17/2019 2.10 PROD, WHPST TRIP P RIH, EDC open, Pumping seawater 76.9 11,120.0 1418 16:24 WHPST DLOG P coil), Inspect 11,120.0 11,515.0 10/17/2019 10/17/2019 0.20 PRODt cou ter, PUW=39Knew 1624 16:36 WHPST FI -Sp P7-- Continue in well, tag nipple at 11,598', 11,515.0 11,680.9 10117/2019 10/17/2019 1.30 PROD? pickup, close EDC, bring on pumps, 1636 17:54 get right through, displace to milling fluid, dry tag TOWS at 11,681.9' 10/17/2019 2.10 PROD1 WHPST WPST P Milling pumping at 11,680.9, FS = 709 11,680.9 11,682.4 10/1712019 psi @ 1.9 bpm, CWT = 14.3K, WOB = 1754 20:00 -0.7K, annular = 4123 psi (11.8 ppg at window), WHP = 145 psi, pump = 4791 psi1.9 bpm in, 1.82 bpm out, vibrations climb to 3's 10/1712019 1011812019 4.00 P ROD1 WHPST WPST P Milling @ 11,682.4', CWT= 13.3K, 11,682.4 11,685.2 WOB = 1.4K, annular = 4117 psi, 20:00 00:00 WHP = 148 psi, pump = 4850 psi, vibrations to 3's 10/18/2019 0.50 PROD1 WHPST WPST -P7- WOB CrWT= 1309iK 11,685.2 11,685.8 10/18/2019 0.3K685.2', 00:00 00:30 WHP = 151 psi, pump = 4786 psi TOWS = 11,681', BOW = 11,684.5' Pre -load DS PDL with build/turn tools 1017812019 3.00 PROD1 WHPST WPST P it, reamer g'I(PU PUW 11,685.8 11,710.0 10/1812019 = 35K at 11,707tring to adj sl 00:30 03:30 TF), mill rat -hole to 11,710', PUW = 36K 10/18/2019 10/18/2019 1.30 PROD! WHPST REAM P g passes SIR 11,710.0 11,710.0 335Rr & 185Rndry drift up &down, 0330 04:48 clean 1.00 PROD! WHPST REAM P Perfasses 11,710.0 11,710.0 10/18/2019 10/18/2019 ensure ultrda slmooltheaming w ndown Confrmo 04:48 05:48 TO @ 11710 after dry drift 10/18/2019 10/18/2019 2.00 PROD1 WHPST TRIP P Trip out of hole, Open EDC @ 11610' 11,710.0 55.0 05:48 07:48 0.80 PRODS WHPST PULD 15-- Tag up, Space out, PUD BHA#1. Mills 55.0 0.0 10/!8/2019 10/18/2019 @ 2.74 Go, 2.73 No Go 07:48 08:36Dut 1.00 PROD1 DRILL PULD P Reconfg BHA, Not running USR, ii 0.0 62.6 10/!8/Z019 10/18/2019 BHA #2 with 2.5° AKO motor and RB 08:36 09:36 Hughes bi center. Make up to coil and surface test. Check pack offs. t 0118/2019 10/18/2019 2.20 PRODi DRILL TRIP P Trip in hole, BHA#2 62.6 11,080.0 09:36 11:48 DRILL DLOG P Log K1 for+21.5', Close EDC 11,080.0 11,133.0 10/18/2019 10/18/2019 0.10 PROD? 11:48 11:54 TRIP P nue in well, Wt chk @window5 11.133.0 11,710.0 10/18/2019 10/18/2019 0.20 PRODI DRILL 36KCon, Cleanpass through 11:54 12:06 DRILL DRLG P , Drill, 1.91 BPM @44U0 PSI 11,710.0 11,755.0 10/18/2019 10/18/2019 1.10 PROD1 FS, HP=4155, Drill to EOB @ 11755' FS, B 1206 13:12 Near bit INC @ 88° 10/18/2019 10/18/2019 0.20 PROD1 DRILL TRIP P End of build PUH to tie into K1 11,755.0 11,100.0 13:12 10118/2019 13:24 10/18/2019 0.20 PROD1 DRILL D LOG P Log Kt for 11 foot . 11,100.0 11,132.0 13:24 10/18/2019 13:3611,132.0 10/18/2019 0.10 PRODt DRILL TRIP P RBIH to log RA marker 11,700.0 1336 13:42 Page 2/17 Report Printed: 11/612019 Operations Summary (with Timelog Depths) r �T"►r-F_.. 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Our (hr) Phase Op Code Activity Code Time P -T -X P Operation Log RA @ 11,689', TOWS @ 11682, (MB) K 00.0 End Depth 10/18/2019 10/18/2019 0.10 PRODi DRILL DLOG TOW @ 11,685, BOW @ 11,688 13:42 13:48 2.10 PROD1 DRILL TRIP P Tull up through window, Open EDC, 11,724 .0 65 .1 10/18/2019 10/18/2019 POOH 13:48 10/18/2019 15:54 10/1812019 1.00 PROD1 DRILL PU T7___ At surface, PJSM, Tag up space out. 65.1 0.0 PUD BHA#2 build section BHA 15:54 10118/2019 16:54 10/18/2019 1.10 PROD1 DRILL PULD P PD BHA#3 Drilling Assembly (NOV 0.0 78.0 Agitator, 0.5° AKO motor, new Baker 16:54 18:00 Dyna -Pilot bit), slide in cart, check pack -offs, MU to coil, tag up, set counters -f0/1 8/20-19 -T-O,, 8/20-19 -1 00 PROD, DRILL TRIP P RIH w/BHA #3 78.0 11,100.0 1800 10/18/2019 19:00 10/18/2019 -0 20 PROD? DRILL DLOG P log K1 for +16' correction 11,100.0 __T11520 1900 10/18/2019 19:12 10118/2019 1.50 PROD1 DRILL TRIP P Continue RIH, PUW = 36K @window, ___11,152.0 11,680.0 19:12 20:42 Stack weight at window @ 10 fpm @ DTF (-11,685'), PU & spin bit, RIH at 15 fpm, no good (-11,688), PU spin bit, pumps off, RIH @ 30 fpm, stack at -11,686', PUW = 36K, oreint TF 15° ROHS @ 30 fpm, stack at orient TF 10° ROHS @ 20 fpm no- good 10/18/2019 10/18/2019 0.80 PROD1 DRILL CIRC T Confer with town, work plan forward 11,680.0 11,680.0 (no 2.74" crayola mills on slope), 20:42 21:30 decison made to POOH for 0.5° AKO motor, 2.74" string reamer & 2.74" DSM 10/18/2019 10/18/2019 2.00 TROD, DRILL TRIP T POOH, tag up, PJSM _-7-1-680.0 78.0 21:30 TO8/2019 23:30 10/19/2019 0.50 PROD1 DRILL PULD T Begin PUD BHA#3 78.0 78.0 23:30 10/19/2019 00:00 10/19/2019 0.70 PROD1 DRILL P_ T Complete PUD BHA #3, considerable 78.0 -78.0 0.0 marking on motor, marks are LS below 00:00 00:42 wear -band & HS above wear -band, possible binding up in window with motor 10/19/2019 10/19/2019 1.00 PRODi DRILL PULD T PD BHA# -4 Window Dressing 0.0 63.0 Assembly (0.5° AKO motor, 2.74" 00:42 01:42 string reamer, & 2.74" DSM), slide in cart, check pack -offs, MU to coil, tag up, set counters 10/19/2019 -1 70/19-12019 -2 00 PR0D1 DRILL TRIP T RIH w/ BHA#5 Window Dressing 63.0 11,075.0 01:42 03:42 Assembly 10/19/2019 10/19/2019 0.20 PROD1 DRILL DLOG T Log K1 for +13.5' correction 11,075.0 11,137.0 03:42 03:54 DRILL TRIP T Continue RIH to window, PUW - 37K 11,137.0 11,684.0 10/19/2019 10/19/2019 0.20 PR0D1 03:54 10/19/2019 04:06 10/19/2019 0.60 FRO D1 DRILL REAM T Dress window, FS = 488 psi @ 1.9 11,684.0 11,684.0 bpm, mill at 1 fpm from 11,684' on 0406 04:42 initial pass (oriented 5' ROHS), observe -90 psi motor work at -11,686.8', then clean to past bottom of window to11,700', back -ream at 5° ROHS, perform an addiontal as milled pass (down & up), clean both ways 10/19/2019 10/19/2019 1.10 PROD1 DRILL REAM T Dry drift window up & down, 30 fpm, 11,684.0 11,684.0 04:42 05:48 clean Perform additonal reaming passes, 35R, 335R, & 185R, dry drift, clean up & down Page 3/17 Report Printed: 111612019 - Operations Summary (with Timelog [Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log smn Depth Stan Tune EM Tana Dur (hr) Phase Op Code Activity Code Time P -T -x Operation (ft)(8) End Depth (ft)(e) 10/19/2019 10/19/2019 1.90 PROM DRILL TRIP T POOH 11,684.0 60.0 05:48 07:42 10/19/2019 10/19/2019 1.00 PROM DRILL PULD T At surface, Tag up and space out. 60.0 0.0 07:42 08:42 PJSM, PUD BHA #4 Window dressing BHA 10/19/2019 10/19/2019 0.80 PROM DRILL PULD T M/U and PD BHA #5 Lateral drilling 0.0 78.3 08:42 09:30 BHA with .5" motor and DynaPilot Bi center bit 10/1912019 10/19/2019 2.00 PRODt DRILL TRIP T RIH BHA# 5, Shallow test agitator @ 78.3 11,111.0 09:30 11:30 1500'- Good 10119/2019 10/1912019 0.30 PROM DRILL DLOG T Log K1 for +18'correction, PUW=33K 11,111.0 11,140.0 11:30 11:48 10/19/2019 10119/2019 0.10 PROM DRILL TRIP T Continue in well. Clean pass through 11,140.0 11,740.0 11:48 11:54 window 10/1912019 10/19/2019 0.10 PRODt DRILL DLOG P Log MADD Pass 11,740.0 11,757.0 11:54 12:00 10/19/2019 10/19/2019 1.60 PROD1 DRILL DRLG P 11757', Drill, 1.88 BPM @ 4765 PSI 11,757.0 11,889.0 12:00 13:36 FS, BHP=4155, RIW=10.8K, DHWOB=I.9K Swap mud to system 1. New mud at bit 11,795' 10/19/2019 0.10 PROD1 DRILL WPRT P 11,866, BHA wiper, PUW=37K. New 11,889.0 11,889.0 13:42 mud around got pressures 10/19/2019 2.20 PROD1 DRILL DRLG P 11889', Drill, 1.92 BPM @ 4870 PSI 11,889.0 12,155.0 15:54 FS, BHP=4200, RIW=10.81k, r36 DHWOB=2.3K. Trouble getting angle to drop from 11970. Lower pump rate and increase WOB. 10119/2019 080 PRODi DRILL WPRT P Pull wiper to 11715. Firs/ wiper after 12,155.0 12,155.0 16:42 drilling 400'. PUW=38K. Trip in slowly waiting to obtain polygon extension 10119/2019 10/19/2019 1.30 PROD1 DRILL DRLG P 12155', Drill, 1.87 BPM @ 4810, 12,155.0 12,355.0 16:42 18:00 1 BHP=4219 10/19/2019 10/19/2019 3.30 PROD1 DRILL DRLG P Drilling, PUW = 38K (obtain 12,355.0 12,497.0 18:00 21:18 parameters), FS = 1100 psi @ 1.9 bpm, CWT = 4K on bottom, WOB = 2.51K, annular = 4224 psi (11.85 ppg @ window), WHIP = 160 psi, pump = 5133 psi, drilling slowed at 12,369', avg ROP = 43 fph 10/19/2019 10/2012019 2.70 PROD1 DRILL DRLG P Drilling, CWT = 6.7K @ 3.8K WOB, 12,497.0 12,520.0 21:18 00:00 annular = 4232 psi (11.85 ppg @ window), WHIP = 204 psi, pump = 5098 psi, pump sweeps as required, PUW = 38K from 12,504', pump 10 x 10 (LoVis with 2.5% DrillZone to aid wl bit balling), allow pill to exit with bit spinning off bottom, pump 5x5 sweeps, avg ROP = 8.5 fph 1012012019 0.50 PROM DRILL WPRT P Wiperto tubing tail, PUW = 35K, jog 12,520.0 11,700.0 00:30 7" casing 10/20/2019 0.10 PROD1 DRILL DLOG P Log RA for+5'correction 11,752.0 00: r10/20/2019 10/20/2019 0.40 PROD1 DRILL WPRT P Wiper in-hole, RIW = 12K 12,520.0 01:00 10/2012019 1.30 PROM DRILL DRLG P Drilling, FS = 1154 psi @ 1.9 bpm, r12,520.0 12,575.0 02:18 CWT = 12K @ 0.6K WOB, annular = 4224 psi, WHIP = 193 psi, pump = 4972 psi, drilling break at -12,575' 10/20/2019 10/20/2019 2.50 PROD1 DRILL DRLG P Drilling, CWT= 11.4K, WOB= 1K, 12,668.0 02:18 04:48 annular = 4240 psi, WHP = 208 psi, pump = 5138 psi, avg ROP = 37 fph 10/2012019 10/20/2019 0.10 PROW DRILL WPRT P BHA wiper, PUW = 40K, RIW = 11.31K 12,668.0 12,668.0 04:48 04:54 Page 4117 Report Printed: 1116/2019 operations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code DRLG Time P -T-% P Operation Drilling, FS = 1121 psi @ 1.9 bpm, (0K13) 12,668.0 End Depth (MB) 12,746.0 10/20/2019 10/20/2019 2.00 PR0D1 DRILL 04:54 06:54 CWT = 10.2K @ 1.9K WOB, annular = 4249 psi, WHP = 190 psi, pump - 5173 psi 10/20/2019 10/20/2019 0.30 PROM DRI WPRT P 12746, BHA wiper, PUW=40K 12,746.0 12,746.0 06:54 07:12 10/20/2019 10/20/2019 4.00 PROM DRILL DRLG P 12746', Drill 1.88 BPM @ 5000 PSI 12,746.0 12,950.0 07:12 11:12 FS, BHP=4165, RIW=11K, DHWOB=IK 10/20/2019 10/20/2019 0.50 PROM DRILL WPRT P 1000' wiper trip #1, PUW=40K. Some 12,950.0 12,950.0 11:12 11:42 slight stacking @ 12600-12700 Lower speed / Rate slightly 10/20/2019 10/20/2019 2.80 PROD1 DRILL DRLG P 12950', Drill, 1.88 BPM @ 5000 PSI 12,950.0 13,105.0 11:42 14:30 FS, BHP=4160 10/20/2019 10/20/2019 0.10 PROD1 DRILL WPRT P BHA wiper, PUW=40K 13,105.0 13,105.0 14:30 14:36 10/20/2019 10/20/2019 1.50 PROD1 DRILL DRLG P 13105'. Drill, 1.88 BPM -@5085 PSI 13,105.0 13,193.0 14:36 16:06 FS, BHP=4245 10/20/2019 10/20/2019 0.10 PROD1 DRILL WPRT P BHA Wiper, PUW=39K, RIW=BK 13,193.0 13,193.0 16:06 16:12 10/20/2019 10/20/2019 1.80 PRODi DRILL DRLG P 13193', Drill, 1.88 BPM @ 5065 PSI 13,193.0 13,302.0 16:12 18:00 FS, BHP=4274, 10/20/2019 0.70 PROW DRILL DRLG P Drilling, CWT = 1.9 K @ 1.5K WOB, 13,302.0 13,350.0 18:00 annular = 4277 psi, WHP = 116 psi, pump = 5272 psi, pump 5x5 sweeps 10/20/2019 1.00 PRODi DRILL WPRT P Wiper to tubing tail, PUW = 40K, begin 13,350.0 11,623.0 1842 F pulling heavy at -12,880', up to -6K (at 12,791') WOB & 62K CWT, observe motorwork, jog 7" casing (pull heavy to varying degrees from -12,600' to -12,860', then return to normal weights) 10/20/2019 10/20/2019 0.10 PROD1 DRILL DLOG P Window PUW = 37K, log RA for+9.5' 11,623.0 11,724.0 19:42 - 19:48 correction, 10/20/2019 10/2012019 0.70 PROD1 DRILL WPRT P Wiper in-hole 11,724.0 13,350.0 19:48 20:30 12,616' stack weight, PUW = 43K, -1K WOB, reduce rate to 1 bpm, stack at 12,605' (2.5K WOB), reduce rate to 0.9 bpm, 20 fpm, stack at 12,682' (2K WOB) & 12,693', reduce to 0.8 bpm, stack weight at 12,685', reduce speed to 6 fpm, work to 12,970', begin increasing rate & RIH speed at 12,970'. Recap: Difficulty RIH 12,615'to 12,970', -15 fpm @ 1 bpm to get down 10/20/2019 10/20/2019 0.50 PROD1 DRILL WPRT P Wiperback up -hole, attemptto 13,350.0 12,610.0 2030 21:00 cleanup 12,970' to 12,615', 1.9 bpm, 15-25 fpm, pull to 55K, at 12,986', 12,678' negative WOB tug, observe motor work, hole appears to be cleaning up 10/20/2019 10/20/2019 0.70 PROD1 DRILL WPRT P Wiper in-hole, stack at 12,612', 1.0 - 12,610.0 12,350.0 21:00 21:42 1.2 bpm @ 10-25 fpm, attempt to increase rate at speed once past 12,970', stacked weight at 13,179' RIW off bottom = 1.8K Page 5117 ReportPrinted: 111612019 Uperations Summary (with Timelog Depths) AV 1 R-23 Job: DRILLING SIDETRACK Rig: NABORS CDR3-AC Time Log scan Depth StartTime End Time Our (hr) Phase Op Code. Activity Code Time P -T -X Operation (ftKB) End 13,350.0 Depth (ftKB) 13,467.0 10/2012019 10/21/2019 2.30 PROD1 DRILL DRLG P CWDrillT= 28K@30.9K OB9 annular= 21:42 00:00 4241 psi, WHP = 92 psi, pump = 5202 psi, avg ROP - 50 fph 1012112019 1.80 PROD1 DRILL DRLG P ___f3_,_467.0 13,569.0 10/21/2019 CWT'Drillino2K@ iK2WOB, annular= 00:00 01:48 4260 psi, WHIP = 127 psi, pump = 5236 psi, swap to new mud system #2, new mud hits bit at 13,530' DRILL DRLG P New mud around, PUW = (new 13,569.0 13,750.0 10/21/2019 10/21/2019 3.20 PROD1 FS -10642K ps I=p3K@1K 01:48 05:00 n186 bpm, CWTaramete WOB!@ annular = 4263 psi, WHIP = 278 psi, pump = 4910 psi, pump 5x5 sweeps 10/21/2019 10/21/2019 0.80 PROD1 DRILL WPRT P per up -hole, PUW=42K 13,750.0 13,750.0 05:00 05:48 DRLG P 13750', @ 4937 PSI 13,750.0 13,928.0 10/21/2019 10/21/2019 3.70 PROD1 DRILL FS, Dr43048RIWM 05:48 09:30 DHWOB=I.2K 10121/2019 7012112019 0.10 PRODt DRILL WPRT P BHA Wiper, PUW=45K 13,928.0 13,928.0 09:30 09:36 DRLG P7— 13 1 BPM @ 4937 PSI 13,928.0 14,074.0 10/21/2019 10/21/2019 4.00 PROD1 DRILL 551087 gHP=rill, 09:36 13:36 1.10 PRODI DRILL WPRT P 500'3K 14,074.0 14,074.0 10/21/2019 10/21/2019 up. SPng RIH Good coming,Pull Stacking 13:36 14:42 Reduce pump rate to .8 BPM. Reduce speed - 15 FPM. No DHWOB —1 DRILL DRLG P Dill, 9 io 14,074.0 14,088.0 10/21/2019 10/21/2019 10 PRODII FS, BHPr4320814074', 070 ROPtdown 5 14:42 15:48 - 10 FPH from 30 to 50 FPH 1.30 PROD1 DRILL WPRT P Stacking, Go to P/U. Very sticky, 14,088.0 11,642.0 10/21/2019 10/21/2019 Pp . Pull wiper to window with 15 48 17.06 s, 1 12,970 to 12,615 Ratty with sweeps, over pulls. Packing off coming up, become detained @ packed off at 11,642', lose returns 0.30 PROD1 DRILL CIRC P Work pipe a bit, pump down 8 11,642.0 11,642.0 10/21/2019 10/21/2019 pressure up backside, work pipe 17:06 17:24 down, become freeturns, regain re 10/21/2019 3.10 PROD1 DRILL WPRT P Pump 5x5 sweeps, circulate bottoms 11,642.0 78.0 10/21/2019 x10 sweeps, cleanup up,made 17:24 20:30 matle to wiperto swab to clean up cased hole 10/21/2019 -i-0/-2-1/201 9 2.00 PROD1 DRILL WPRT P Wiper in-hole 78.0 11,100.0 2030 22:3011,100.0 10/21/2019 —0 T0 PR0D1 DRILL DLOG P Log K1 Tor +13' 11,124.0 10/21/2019 22:30 22:36 10/21/2019 0.80 PR0D1 DRILL WPRT P tack weight at 116813 PU&roll 6K at cow, 11'124.0 __T1__682.0 10/21/2019 2236 23:24 pumps, stack at 11,685', bring on pump, jog 7", attempt to clean up near TOWS, stack again at 11,685', attempt at 0.25 bpm, stack at 11,683', attempt 20° R from as milled TF, stack at 11,683', attempt 15° LOHS, no good, confer with town, decision made to POOH for cleanout assembly 0.60 PROD1 DRILL TRIP T p sweeps, open EDC, begin 11,682.0 9,648.0 1012112019 10/22/2019 Pu 23:24 00:00 PROD1 DRILL TRIP T Continue POOH, tag up, PJSM 9,648.0 78.0 10/22/2019 10/22/2019 1.60 00:00 01:36 DRILL PULD T PUD BHA#5, bit came out packed off 78.0 0.0 10/22/2019 10/22/2019 0.90 PROD1 with clay, 2 plugged nozzles, & 10 01:36 02:30 chipped/broken reamer cutters Page 6117 Report Printed: 1116/2019 Operations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Cade Time P-T-X Operation PD ­­SHA Assembly (0.5° pflKB) 0.0 End Depth(ItKB) 72.0 10/22/2019 10/22/2019 1.20 PROD1 DRILL PULD T AKO motor & 2.74" D331 ridge-set), 0230 03:42 slide in cart, MU to coil, check pack- offs, MU to coil 10/22/2019 10122/2019 2.00 PROD1 DRILL TRIP T RIH w/BHA#6 72.0 11,100.0 0342 10/22/2019 05:42 10/22/2019 0.10 PROD1 DRILL DLOG T Log K1 for-13', PUW=38K 11,100.0 11,117.0 0542 05:48 10/22/2019 0.20 PROD1 DRILL TRIP T Continue in well. Line up to 5° ROHS, 11,117.0 11,694.0 10/22/2019 pumping 1.9 BPM @ 4680 PSI 05:48 06:00 FSStack out @ 11694 with motorwork and reactive torque 10/22/2019 10/22/2019 2.70 7R0D1 DRILL CTOP T PUW=37K PUH, RBIH to 11699, 11,694.0 11,800.0 Stack with motor work, PUH, Recip 06:00 08:42 back to 11699. Recip with sweeps, RBIH stack with motor work @ 11703. PUH to 11651. Pump sweeps RBIH pass 11,700 to 11,800' 10/22/2019 10/22/2019 0.50 PROD? DRILL CTOP T 11,800 to 12,600 fairly clear Set down 11,800.0 12,600.0 @ 12603. Reip to TT 08:42 10/22/2019 09:12 10/22/2019 1.90 PROD1 DRILL CTOP T Word from town. Set anchor billet @ 12,600.0 12,400.0 -12,190. PUH and work hole 12,400 09.12 11:06 to TT with sweeps 10/22/2019 10/2212019 3.00 PROD1 DRILL TRIP T Trip out for OH anchor billet 12,400.0 65.0 1106 10/22/2019 14:06 10/22/2019 1 A0 PROD1 DRILL PULD T At surface, Tag up and space out, 65.0 0.0 PJSM, PUD BHA#6 Mill out 2.73" No 1406 15:12 Go 10/22/2019 10/22/2019 0.90 PROD1 DRILL PULD T Reconfig /M/U #oil end th OH 0.0 82.3 anchor billet. PD,A. to 1512 16:06 surface test. Stab on well. Tag up and space out 10/22/2019 10/22/2019 2.10 PR0D1 DRILL TRIP T Trip in hole 3HA#7 Anchor billet. EDC 82.3 11,100.0 1606 10/22/2019 18:12 10/22/2019 0.10 PROD1 DRILL DLOG T open Log K1 for+ 12.5', PUW=38K 11,100.0 11,131.0 1812 10/22/2019 18:18 10/22/2019 0.50 PROD1 DRILL TRIP T Continue in well, Close EDC @ 11638 11,131.0 12,201.8 Clean pass through window down to 1818 18:48 set depth @ 12201.8 oriented to 10° ROHS 10/22/2019 10/22/2019 0.10 PROD? DRILL CTOP T At set depth and orientation. PU to 12,201.8 12,201.8 35K. Bring pumps online. See tool 1848 18:54 shift @ 5100 PSI. Set down 5K on anchor 10/22/2019 10/22/2019 2.20 PROD1 DRILL TRIP T Trip out after setting billet, PUW=39K, 12,201.6 65.0 Open EDC in cased hole 1854 10/2212019 21:06 1212019 0/2 0.90 PROD? DRILL PULD T Ta g up and space out, PUD BHA#7 65.0 0.0 billet setting tools 21:06 10/22/2019 22:00 10/2212019 0.80 PROD1 STK PULD T PD BHA#8 (NOV agiator, 0.5°, & RB 0.0 78.0 22:00 10/22/2019 22:48 10/23/2019 1.20 PROD1 STK TRIP T Cl) RIH w/ BHA#8, shallow test agitator, 78.0 6,100.0 dp = 1180 psi, good action at surface 22:48 10/23/2019 00:00 10/23/2019 0.90 PR0D1 STK TRIP T RIH w/BHA #8 6,100.0 11,100.0 00:00 10/23/2019 00:54 10/23/2019 0.10 PROD1 STK DLOG T Log K1 for +13' correction 11,100.0 11,123.0 00:54 10/23/2019 01:00 10/23/2019 1.20 PROD1 STK TRIP T Confine RIH, PUW =39K @window, 11,723.0 12,189.4 re-boot BHI direction software, unable 01:00 02:12 to orient, trouble-shoot, resolve issue, clean through window, dry tag TOB at 12,191', bring on pumps, RBIH to mill Page 7/17 ReportPrinted: 11/6/2019 Uperations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Used, Start Time End Time our(hr) Phase Op Code Activity Code Time P -T -X T Operaton FS = 1205 @ 1.9 bpm, begin (ftKB) 12,189.5 End Depm(ftKe) 12,190.5 10/23/2019 10/23/2019 0.80 PROD1 STK KOST psi milling on billet at 12,189.5', oriented 02:12 03:00 330° ROHS I ft/hr for 1 ft CWT = 15 SK, WOB = 0.31K, pump = 5126 psi 10/23/2019 10/23/2019 0.50 PROD, STK KOST T Go to 2 ft/hr for 1 it 12,190.5 12,191.5 0300 10/23/2019 03:30 10/23/2019 0.40 PROD7 STK 70 -ST T Go to 3 ft/hr for 1 ft 12,191.5 12,192.5 03:30 10/23/2019 03:54 10/23/2019 0.40 PROD1 STK KOST T Begin pushing on it, looking for WOB 12,192.5 12,202.0 to gain departure (10 fph), CWT = 0354 04:18 13.1 K, WOB = 1.1 K, pump = 5162 psi, increase to 15 fph, come up to 20 fph, go to 30 fph, go to 60 fph, off billet 10/23/2019 10/23/2019 0.70 PROD1 DRILL DRLG T Drilling, CWT = 12.2K, WOB = 1.3K, 12,202.0 12,290.0 annular = 4210 psi, WHP = 233 psi, 04:18 05:00 pump = 5258 psi, pump 5x5 sweeps 10/23/2019 10/23/2019 0.30 PROD, DRILL WPRT T PUW = 39K, dry drift billet area up & 12,290.0 12,290.0 05:00 05:18 down, clean 10/23/2019 10/23/2019 3.00 PRODt DRILL DRLG T Drilling, FS = 1195 psi @ 1.9 bpm, 12,290.0 12,465.0 CWT = 11.5K @ 2.7K WOB, annular = 05:18 08:18 4216 psi, WHP = 196 psi, pump = 5534 psi, avg ROP = 58 fph 10/23/2019 10/23/2019 3.20 PROD, DRILL DRLG T Drilling, CWT = 9.4K @ 2.61K WOB, 12,465.0 12,590.0 annular= 4222 psi, pump = 5441 psi, 08:18 11:30 PUW = 39K from 12,521', avg ROP = 39 fph 10/23/2019 10/23/2019 0.40 PR0D1 DRILL DRLG T Wiper up -hole, PUW = 40K 12,590.0 11,790.0 11:30 10/23/2019 11:54 10/23/2019 0.40 PROD1 DRILL WPRT T ettdownrough ,per n hole,atty 212 11'790.0 12,590.0 7 515', RIW 11:54 12:18 = 11.SK 10/23/2019 10/23/2019 3.20 PROD, DRILL DRLG T W Drilling, FS = 1359 psi, CT = 10.7K 12,590.0 12,849.0 @ 3.2K, annular = 4227 psi, WHP = 12:18 15:30 167 psi, pump = 5535 psi, pump 5x5 sweeps as required, PUW = 43K from 12,849', avg ROP = 81 fph 10/23/2019 10/23/2019 1.10 PR0D1 DRILL DRLG T Drilling, CWT = 9.8K @ 1.1 K WOB, 12,849.0 12,923.0 annular = 4233 psi, WHP = 115 psi, 1530 16:36 pump = 5555 psi, avg ROP = 67 fph 10/23/2019 10/23/2019 0.20 PROD1 DRILL WPRT T BHA wiper, PUW = 43K, grab missed 12,923.0 12,923.0 1636 10/23/2019 16:48 10/23/2019 1.40 PROM DRILL DRLG T survey Drilling, FS = 1350 psi @ 1.9 bpm, 12,923.0 13,010.0 CWT = 11.5K @ 1.25K WOB, annular 16:48 18:12 = 4200 psi, pump = 5577 psi 10/23/2019 10/23/2019 0.70 PRODI DRILL WPRT T TU Wt 41 k lbs, - clean, PUH slowly 13,010.0 11,668.0 waiting for sweeps to exit the bit - 18:12 18:54 chase sweeps up hole on 2 nd wiper to the 7" @ 18:23. Slight neg WOB drag until above 12,236'. No significat overpulls, Billet and window clean. 10/23/2019 10/23/2019 0.70 PROD1 -[5R-ILL CI RC T Pack off in the 7", Bit depth 11,641' 11,668.0 11,644.0 Bow rate out dropped from 79 gpm to 1854 19:36 a low of 66 gpm. RBIH, work pipe, regain returns. Send 5x5 sweep, while joging 7", send second 5x5, significant cutting at the shaker, no rocks. Chase bottoms up. pullled through window @ 0.55 bpm and 10ft/min.B Page 8/17 Report Printetl: 11/6/2019 Operations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Start TIT. End Time Dur (ho Phase Op Code Activity Code T Time P -T -X operator RBIwi er tip. set (WB) End 11.644.0 Depth (WB) 11,092.0 10/23/2019 10/23/2019 0.30 PROD1 DRILL CIRC down twico e @ H1 n 19:36 19:54 Pump 5x5 while PUH to tie in. PR0D1 DRILL DLOG T Tie into the Kt fora + 13' correction. 11,092.0 11,141.0 10/23/2019 10/23/2019 0.20 19:54 20:06 CIRC T pas window, set 11,141.0 11,647.0 10/23/2019 10/23/2019 0.40 PROD1 DRILL down @(11,693' 20:06 20:30 PUH park and open EDC, launch 5x5 x2 PROD1 DRILL CIRC T Chase sweeps to EDC while jogging 11,647.0 11,608.0 10/23/2019 10/23/2019 0.60 20:30 21:06 10/23/2019 2.00 PROD1 DRILL TRIP T . Lots f chasing sbillet 11.608.0 71.0 10/23/2019 cuttings nd aluminum n 21:06 23:06 sweeps, jog hole at 500'. more aluminum at surface. Blew down MM and chokes. Open, inspect and clean choke. - 1 bbl of returns on the trip. 10123/2019 10/23/2019 0.80 PR0D1 DRILL PULD T PUD BHA Bit balled p, packed with clay and 71.0 0.0 2306 23:54 some smallll r rocks, two plugged nozzles. 10/2312019 10/24/2019 0.10 PROD( DRILL BOPE T Function test B OPE 0.0 0.0 2354 10/2412019 00:000.0 10/2412019 0.20 PROD( DRILL BOPE T Function test 80PE 0.0 0000 00:12 PULD T PD BHA#9, cleanout assembly, 0.5° 0.0 71.9 10/24/2019 10/24/2019 0.90 PROD? DRILL motor w D331 ridgeset bit. 0012 10/24/2019 01:06AKO 10/2412019 1.90 PROD1 DR ILL TRIP T RIH 71.9 11,100.0 O1t06 03:00 DRILL DLOG T Tie into the Kl for+ll' 11,100.0 11,130.7 10/24/2019 10/24/2019 0.10 PROD1 03:00 03:06 -[TL-OG T Closeto RIH, PU Wt @ 11,130.7 11,693.0 10/24/2019 10/24/2019 0.30 PR0D1 DRILL 647 3D8 k continue 03:06 03:24 Stage two sweeps 0.30 PROW DRILL WASH T CT 4599 psi @1.9 bpm in/out, free 11,693.0 11,716.0 10/24/2019 10/24/2019 sping diff 560 psi, BHP 4143 psi, WH 03:24 03:42 160 psi, IA 489 psi, OA 0 psi. CT Wt 12 k Ibs. Work down hole, slight motor work and WOB @ 11,699'. WOB increased to 3 k Ibs with motor work @ 11,714', broke back then increased again by 11,716' 2.50 PRODi DRILL WASH T ging, starttl5 kt o @ H1 11,716.0 11,680.0 10/24/2019 10/2412019 WOWt -7 i8 lbs 703'k 0342 06:12 overpull on CT Wt, packing off, work pipe, regain returns, pull to casing. RBIH to 11,720', some motor work & WOB. PU, 39 k lbs. Pull to casing, clean. Continue to Clean out taking 10' bites to 11,780', ciruculate bottoms up, dry drift window, full rate down to 11,780', clean 2.70 PROD1 DRILL WPRT T Open EDC, pump 10x10 sweeps @ 2 11,680.0 72.0 10/24/2019 10/24/2019 bpm, POOH, PJSM 06:12 08:54 DRILL PULD T PUD BHA#9, mill came out 2.73" no- 72.0 0.0 10/24/2019 10/24/2019 0.80 PRODi 08:54 09:42 1.20 PROD( DRILL PULD T 90 PO BHA#10 Drilling by (NOV 0.0 78.0 10/24/2019 10/24/2019 otor, & Agitator, motor, & Cl bit), 09A2 10:54 slide in cart, check pack -offs, MU to art, cheAKOck coil,tag up, set counters 'a' 2.00 PROD1 DRILL TRIP T RIH shallow test, up= 78.0 11,100.0 10/24/2019 10/24/2019 1300 psi, pump = 4910 psi, good 1054 12:54 Report Printed: 1116/2019 Page 9117 Operations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Mthr) Phase —OD Op Code Activity Code DLOG Time P -T -X 7 Operation Lag K1 for 11.5, PUW = 35K (ftKB) 11,100.0 End Depm(ftKB) 11,131.0 14/2019 0/2 0/24/2019 1 0.10 PRI DRILL 1254 10/24/2019 13:00 10/2412019 0.70 PROD1 DRILL TRIP T Continue RIH, stack at 11,6821, PU & 11,131.0 13,010.0 13:00 13:42 get right through window clean, begin sending new mud (system #3), stack weight at 12,385', stack again at same depth, PU & work through at 0.8 bpm & 25 fpm, stack at 12,434' (PUW = 47K) Bore pressuring up, 1 -for -1 returns (likely plugged no=tes), begin pulling -14K WOB, —12,420', can orient (slight amperage increase), free pipe pulling to 70K, pump sweeps 10/24/2019 10/24/2019 0.70 TR DRILL DRLG T PUH to BOW, jog build, pull through 13,010.0 11,642.0 window (0.5 bpm @ 10 fpm), jog 7", 13:42 14:24 pump sweeps, circulate bottoms up (w/ new mud) 10/24/2019 10/24/2019 0.90 PROD1 DRILL TRIP T RBIH, stack at 11,679, roll bit, stack 11,642.0 12,385.0 1424 15:18 again (3X), circulate sweeps to surface, clean through window, clean past billet, 10/24/2019 10/24/2019 1.20 PROD1 DRILL TRIP T Continue RIH @ 1.9 bpm, stacked at 12,385.0 12,440.0 12,385', work down taking bites, work 15:18 16:30 to 12,396', PU, clean, RBIH, work to 12,416', PU, begin seeing weight at 12,396', losing hole, appears to be caving, continue working down to 12,420', PUW = 43K, 5K overpull at 12,386, begin seeing weight at 12,403', work to 12,445', PU, work/"drill" to get back to 12,445', work to 12,469' 10/24/2019 10/24/2019 1.90 PRODt DRILL TRIP T Become detained at 12,440, �full 12,440.0 11,631.0 70K ( 13K WOB), work 16:30 18:24 pipe free, pump sweeps, pull to BOW, jog build until full bottoms up of sweeps, pull through window at 0.5 bpm @ 10 fpm, jog 7" pumping sweeps, chase bottoms up. 10/24/2019 10/24/2019 0.20 PROD DRILL TRIP T RIH, attempt to dry drift w1ndow@20 11,631.0 11,673.0 18:24 18:36 ft/min, SD @ 11,683', PU 43 k lbs. PU, RBIH and pass window cleanly. WOB spike to 2 k @ 11,702', fell off continued on in hole to 11,760' EOB. PUH through window- clean. 10/24/2019 10/24/2019 2.30 PROD1 DRILL TRIP T POOH spinning the bit, 1.9 bpm in and 11,673.0 61.7 1.45 bpm out. jog the tubing at 500'. 1836 10/24/2019 20:54 10/24/2019 1.40 PROD1 DRILL PULD T Bump up, space out PUD BHA# 10. 61.7 0.0 2054 22:18 "Bit came out 1-4 with most reamers sheared off. 10/24/2019 10/24/2019 1.10 PROD1 STK PULD T PD BHA#11, open hole anchored 0.0 72.9 2218 10/24/2019 23:24 10/25/2019 0.60 PRODt STK TRIP T billet. RIH wbillet. 72.9 2,757.0 2324 10/ 25/2019 00:00 10/25/2019 1.20 PROD1 STK TRIP 7 RIH w billet. 2,757.0 11,113.0 00:00 10/25/2019 01:12 10/25/2019 0.20 PROD7 STK DLOG T Tie into the K1 marker for a 14 11,113.0 11,146.6 01:12 01:24 correction. Page 10/17 ReportPrinted: 11/612019 Operations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Dept Start Time End Time Dur (hr) Phase Op Code Activity Code Time 0.T -X Operation (ftKB) End Depth (ftKB) 10/25/2019 10/25/2019 1.00 PRODt STK WPST T Continue in hole to 11,635, PU Wt 39 11,146.6 12,141.8 01:24 02:24 k lbs. Park in cased hole above window, close EDC. Attempt to RIH, SID @ 11,709, 5 k WOB 45k PU, repeat 5 times, PU's ranged from 40 to 47 k lbs. saw -2.6 k WOB on one attempt. Rolled TF to various orientations after second stack. After 6th attempt, RIH to 12,141.8'. Orient TF to 210° ROHS, PU to neutral weight online with the pump. Saw shear @ 4800 psi, WOB climbed to 1.4 k, set down to 4.3 k lbs - good set PU Wt 43 k lbs. 10/25/2019 10/25/2019 0.30 PROD1 STK TRIP T PUH to cased hole. 12,141.8 11,499.0 02:24 02:42 10/25/2019 1025/2019 0.60 PROD1 STK CTOP T Park and inspect fluid on off reel side 12,141.8 11,499.0 02:42 03:18 right angle drive. 1025/2019 10/252019 1.90 PROD1 STK TRIP T Continue out of hole, PJSM 11,499.0 72.0 03:18 05:12 10/25/2019 10/25/2019 1.20 PR0D1 STK PULD T PUD BHA #11, crew change 72.0 0.0 05:12 06:24 10/25/2019 1025/2019 1.10 PR0D1 STK PULD T PD BHA#12, slide in cart, change out 0.0 78.0 06:24 07:30 pack -offs, MU to coil, tag up, set counters 10/25/2019 1025/2019 0.10 PROD1 STK TRIP T RIH w/ BHA#12, pump pressure 78.0 78.0 07:30 07:36 climbing, bore not climbing 10/25/2019 10/25/2019 0.40 PROD1 STK PULD T Bleed off pump, Pop off, open DBV, 78.0 78.0 07:36 08:00 stab back on, complete PD 10/25/2019 10/252019 2.00 PROD1 STK TRIP T RIH w/ BHA#12, shallow test tools, 78.0 11,100.0 08:00 10:00 1.9 bpm, pump = 4800 psi, dp = 1092 psi 10/25/2019 1025/2019 0.10 PROD1 STK DLOG T Log Kt for+21' 11,100.0 11,119.0 10:00 10:06 10/25/2019 10/25/2019 0.60 PROD1 STK TRIP T Continue RIH, PUW @ window = 37K, 11,119.0 12,130.4 10:06 10:42 clean through window, dry tag TOB 12,132', PUW = 41 K, bring up pumps 10252019 10/25/2019 2.30 PROD1 STK KOST T Milling at 12,130.4', FS = 1021 psi @ 12,130.4 12,131.0 10:42 13:00 1.9 bpm, pump = 4906 psi, 1 ft/hr for 1 ft Stall at 12131.3', PUW = 42K, stall again at 12,131.24', stall at 12131.0, observe CWT climb while time milling, difficulty getting restarted, stick slipping, work down in 1110's to find weight and get restarted, add addilonal 1% 776 to system, creep down to 12,131.04' and go into stall 10/25/2019 10/25/2019 0.80 PRODt STK _ROST _KOSTT Continue attempting to get started, 12,131.0 12,130.6 13:00 13:48 awaiting addition of lubes in system, stall again at 12,131.04', wiper up to BOW, awaiting lubed mud to bit, RBIH 10/252019 10/25/2019 0.80 PROD1 STK KOST T With lube all the way around, put in 12,130.6 12,131.4 13:48 14:36 auto driller at 1 ft/hr at 12,130.6' 10/25/2019 10/25/2019 0.50 PROD1 STK KOST T Go to 2 ft/hr for 1 ft 12,131.4 12,132.4 14:36 15:06 10/25/2019 10/252019 0.30 PROD1 STK KOST T Go to 3 ft/hr for 1ft 12,132.4 12,133.4 15:06 15:24 10252019 1025/2019 0.30 PR0D1 STK ROST KOSTT Go to 10 fuhr, go to 20 ft/hr 1,233.4 12,140.0 15:24 15:42 Page 11117 Report Printed: 111161201 9 Uperations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log startDepth StartTime End Time Our (m) Phase Op Code Activity Code Time P -T -X Operabon Off billet, drilling ahead, 5x5 (ftKB) 12,140.0 End Depth(ftKB) 12,221.0 10/25/2019 10/25/2019 2.20 PROD1 DRILL DRLG T pump 15:42 17:54 sweeps Unload ODS PDL 10/25/2019 10/25/2019 0.10 PROD1 DRILL WPRT T Dry drift billet up —& down, clean 12,221.0 12,221.0 1754 18:00 10/25/2019 10/25/2019 1.50 PROD1 DRILL -CTR—LG T CT 5310 psi @ 1.9 bpm in and out, FS 12,221.0 12,271.0 1800 19:30 1127 psi, BHP 4189 psi - targeting 11.8 @ the window, CT Wt 11.5 k lbs, WOB variable to 3 k lbs. 10/25/2019 10/2019 25/ 1.50 PROD1 DRILL WPST T PU on wiper#1, PU Wt 42 k lbs. 12,271.0 11,695.0 19:30 21:00 Decision made to come all the way to the 7" post billet sidetrack. Jog the build with sweeps timed out in build and fight before exiting the window. Jog 7" and chase up hole with sweeps RBIH 10/25/2019 10/25/2019 0.10 PROD1 DRILL [LOG T Tie into the RA tag for +5.5' correction 11,695.0 11,728.0 21:00 21:06 10/25/2019 10/25/2019 0.40 PRODi DRILL WPRT T RBIH post wiper to window 11,728.0 12,271.0 21:06 21:30 10/25/2019 10/2512019 1.10 PROD1 DRILL -5-RG T CT 5450 psi @ 1.90 bpm in&out, Free 12,271.0 12,371.0 21:30 22:36 spin 956 psi, BHP 4202 psi, OBD, WOB to 3 k lbs, Average ROP over interval 90 ft/hr 10/25/2019 10/25/2019 0.20 PROD1 DRILL WPRT T PU on first short wiper 214' staying 12,371.0 12,371.0 22:36 22:48 below the billet, PU Wt 43 k lbs - RBIH 10/25/2019 10/25/2019 0.60 PRODi DRILL DRLG T CT 5450 psi @ 1.90 bpm in&out, Free 12,371.0 12,494.0 22:48 23:24 spin 956 psi, BHP 4202 psi, OBD, WOB to 3 k lbs, PU - 12,443' to roll TF - 41 k lbs Average ROP over interval 205 Whir 10/25/2019 10/26/2019 0.60 PROD1 DRILL WPST T PU on wiper #2 - long wiper to window 12,494.0 11,713.0 23:24 0000 PU Wt 42 k lbs. 10/26/2019 10/26/2019 0.70 PRODi DRILL WPRT T Continue up hole on long wiper to the 11,713.0 11,699.0 00:00 00:42 window Jog the build with sweeps timed out in build and fight before exiting the window. Jog 7" and chase up hole with sweeps RBIH 10/26/2019 10/2612019 0.10 PROD1 DRILL DLOG T Tie into the RA tag for +3' correction 11,699.0 11,733.0 0042 00:48 10/26/2019 10/26/2019 0.30 PRODi DRILL WPR7 T RBIH post wiper to window 11,733.0 12,494.0 00:48 01:06 10/26/2019 10/26 12019 2.10 FROM D1 DRILL DRLG T CT 5499 psi @ 1.90 bpm in &out, 12,494.0 12,632.0 01:06 03:12 Free spin 1042 psi, BHP 4210 psi, OBD, WOB to 3 k lbs, 10/26/2019 10/26/2019 0.40 PROD1 DRILL WPRT T PU on first short wiper 460' staying 12,632.0 12,632.0 03:12 03:36 below the billet, PU Wt 41 k lbs - RBIH 10/26/2019 10/26/2019 2.40 PROD1 DRILL -CTR—LG T CT 5649 psi @ 1.90 bpm in &out, 12,632.0 12,695.0 03:36 06:00 Free spin 1183 psi, BHP 4232 psi, WH 67 psi, IA 611 psi, OA 8 psi, OBD, CT Wt 9.6 k lbs WOB to 2.2 k lbs 10/26/2019 1.50 PROD1 DRILL DRLG T Drilling, CWT = 7K @ 2.8K WOB, 12,695.0 12,753.0 06:00 07:30 annular= 4257 psi, WHP = 70 psi, 110/26/2019 pump = 5848 psi, significant clay over shakers, pump 2x2 sweeps Page 12117 Report Printed: 11/6/2019 s . Operations Summary (with Timelog Depths) }YYri.. 1W 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Stan Depth Stan Time End Time Dur (hr) Phase Op Code AMV,ty Code Time P -T -x T Opemfion Wipertotubing tail, PUW=40K, pump (fiKB) 12,753.0 End Depth (flKB) 11,700.0 10I26I2019 10/26/2019 1.10 PRODI DRILL WPRT 5x5 sweeps, jog build, stack weight at 07:30 08:36 11,716', pull through window, jog 7", jet XN nipple Stack at 11,688' (5.7K WOB), PUW = 45K, through window clean at 30 fpm 10/26/2019 10/26/2019 0.10 PROD1 DRILL DLOG T Log RA tag for+5' correction 11,782.0 11,728.0 08:36 10/26/2019 08:42 10/26/2019 0.50 -P-R-0-0 i DRILL WPRT T Wiper in-hole, weight bobbles at 11,728.0 12,753.0 beginning at -12,730', RIW = 10K 08:42 10126/2019 09:12 10/26/2019 1.00 PROD1 DRILL DRLG T Drilling, FS = 1150 psi @ 1.9 bpm, 12,753.0 12,850.0 CWT = 1 OK 2 1.4K WOB, annular = 09:12 10:12 4249 pis, WHIP = 18 psi, pump = 5784 psi, difficulty dropping Inc, lower to 1.75 bpm per DD request, avg ROP = 97 fph 10/26/2019 10/26/2019 0.40 PROD1 DRILL WPRT T 400' wiper up -hole, PUN = 38K, stack 12,850.0 12,850.0 10:12 10:36 weight at -12,650'- 12,675', RIW = 10.8K 10/26/2019 10/26/2019 2.20 PROD1 DRILL TR T Drilling, FS = 940 psi _@7 bpm (rate 12,850.0 ___-7-2,950.0 to aid in dropping inclination), CWT = 1036 12:48 9.8K @ 1.2 WOB, annular = 4274 psi, WHP = 53 psi, pump = 5187 psi, ROP slows, avg ROP = 45 fph, pump 2x2 sweeps 10/26/2019 10/26/2019 1.10 PROM DRILL WPRT T to 2x2 12,950.0 11,700.0 fortEOB9 smlallWg pulliK, tmietlror E ng past 1248 13:54 billet, tug at 11,754', partial pack -off (minor), turn around 8 stack 12,708', PU, stack at 12,715' (pass 12,715' at 5 fpm), clean through window, jet XN nipple, stack at 11,688' (2X), 10/26/2019 10/26/2019 0.10 PROD1 DRILL DLOG T Log RA for +5' correction 11,700.0 11,723.0 13:54 10/26/2019 14:00 70/26/2019 0.60 PROD, DRILL WPRT TWiper ii erin(possista kat 11,723.0 12,950.0 per town 14:00 14:36 geology), get by at -1 bpm at 15-30 fpm, RIW = 9.9K 70/26/2019 10126/2019 1.20 PRODt DRILL DRLG T Drilling, FS = 1074 psi @ 1.9 bpm, 12,950.0 13,051.0 CWT = 12K @ 1 K WOB, annular = 14:36 15:48 4268 psi, WHIP = 15 psi, pump = 5805 psi 10/26/2019 10/26/2019 0.40 PROD1 DRILL WPRT T 400' wiper, PUW = 40K, -12,665, 13,051.0 13,051.0 RBIH, go to 1.2 bpm @ -25 fph from 15:48 16:12 12,660' - 12,700', stack weight at 12,738', PUW = 39, RIW = 10.5K 10/26/2019 10/26/2019 1.30 PROD1 DRILL DRLG T Drilling, FS = 1144 psi @ 1.9 bpm, 13,051.0 13,151.0 CWT = 9.71K @ 0.9K WOB, annular= 16:12 17:30 4308 psi, pump = 5865 psi 10/26/2019 10/26/2019 1.40 PROD1 DRILL WPRT T Wiper to tubing tail, PUW = 39. PUH 13,151.0 11,700.0 on long wiper to the window 1730 18:54 Draggy section from 12,697 - 12,297' - 0.3 to -.8 k lbs WOB w/motor work. Pulled 15 k lbs over CT Wt w neg WOB and packed off @ 11,758' Worked pipe 4 times Worked free, returns returned, RBIH to 11,811' PUH, -1k WOB tug @ 11,678' Jet 7" pump 2x2 sweep. RBIH - clean. Page 13117 Report Printed: 11/6/2019 Summary (with Timelog Depths) 1 R-23 lipoperations Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth $ten Time End Time Dur(hn Phase Op code AcbvyCode Time P -T -X Operation (fIKB) End Depth(Wti) 10/26/2019 10/26/2019 0.10 FROM DRILL DLOG T Tie int the RA lag for a +5.5' 11,700.0 11,723.0 18:54 19:00 10/26/2019 10126/2019 0.80 FROM DRILL WPRT T RBIH post wiper to window. 11,723.0 13,151.0 19:00 19:48 12,643' set down PU W143 k lbs, -2.5 k WOB 12,664' WOB to 1.5k lbs 12,757' WOB to 1.2 k lbs 12,875' WOB to 3 K set down, PU Wt 38 k lbs, cut pump to 1.66 bpm -07 k WOB Continue in hole 10126/2019 10/26/2019 1.80 FROM DRILL DRLG T Ct 5834 psi, @ 1.9 bpm in/out. FS 13,151.0 13,252.0 19:48 21:36 1196 psi, BHP 4314 psi -targeting 11.8 @ the window, currently 12.36 ppg @ the bit. WH 78 psi - open choke, IA 661 psi, OA 6 psi. Ct 10 k falling to 0 over drilled interval. WOB 1.5 k Ibs. 10/26/2019 10126/2019 1.00 FROM DRILL WPRT T PU W142 k lbs, PUH on short wiper 13,252.0 13,252.0 21:36 22:36 #1 PUH to 12,843'-400' RBIH, pull short jog/geo wiper to discuss planforward for invert, RBIH 10/26/2019 10127/2019 1.40 PROD1 DRILL DRLG T CT 5874 psi, 1.90 bpm in/out. Free 13,252.0 13,340.0 22:36 00:00 spin 1187 psi, BHP 4335 psi. Ct Wt 3 k lbs, WOB 1.3 k Ibs. 10/27/2019 10/27/2019 0.20 FROM DRILL DRLG T Continue to drill ahead. 13,340.0 13,350.0 00:00 00:12 10/27/2019 10/27/2019 1.60 FROM DRILL WPRT T PU W 44 k lbs, PUH on long wiper to 13,350.0 11,700.0 00:12 01:48 the window. WOB to -3.3 k Ibs tug at 12,626' Time first sweep to exit @ 11,800'. Pull to 11,760' while sweep exits, RBIH to 12,000'. PUH cutting speed @ 11,740' letting sweep exit. @ 11,720' cut pump to 0.55 bpm and pull @ 5 ft/min through window in to 7" -1 k WOB lug @ 11,678 while pulling past the window Jet 7" chase bottoms up. RBIH @ 30 11/min through window 5 ft/min once in open hole. 3K WOB spike @ 11,685' 10/27/2019 10/27/2019 0.10 PRODt DRILL DLOG T Tie int the RA tag for a +7' 11,700.0 11,736.0 01:48 01:54 10/27/2019 10/27/2019 0.80 FROM DRILL WPRT T RBIH post wiper to window. 11,736.0 13,352.0 01:54 02:42 12,900' S/D w 2 k WOB, PU 41 k Ibs 13,157' S/D w 2.3 k WOB, PU 42 k Ibs 13,238' S/D 3 times, PU up to 46 k Ibs, PUH, RBIH, cut rate to 0.5 bpm, 30 ft/min. Walk rate up after 13,250 continue to RIH 10/27/2019 10/27/2019 1.80 PROD1 DRILL DRLG T Ct 5930 psi, @ 1.9 bpm in/out. FS 13,352.0 13,461.0 02:42 04:30 1148 psi, BHP 4360 psi - targeting 11.8 @ the window, currently 12.56 ppg @ the bit. WH 16 psi - open choke, IA 648 psi, OA 8 psi. CT RIH WT 9 k, OBD 2.5 k lbs, WOB 1.25 k Ibs. Page 14117 Report Printed: 11/6/2019 Uperations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Time End Time our (hr) Phase Op Code Atlivity Code WPRT Time P-T-X T Operation sBI k13060u400' hurt wiper (MB) 13,461.0 Entl Dept (MB) 13,461.0 10/27/2019 10/27/2019 0.40 PR0D1 DRILL #1 Pl1tH9 04:30 04:54 Set down @ 13,156- PU proactively cut rate from 1.9 to 1.56 Continue to RIH @ 40 fUmin 10/27/2019 10/27/2019 2.00 PROD1 DRILL DRLG T CT 5935 psi, 1.89 bpm in/out. Free 13,461.0 13,560.0 spin 1111 psi, BHP 4338 psi. Ct Wt 6 04:54 06:54 k lbs, WOB 1.3 k lbs., pumps 2x2 sweeps 10/27/2019 10127/2019 1.30 PROD1 DRILL WPRT T aIW06 412,660mp 13,560.0 11,700.0 swleepsoforrbEOBing tug 06:54 08:12 clean past billet, jog build, small tug through window, jog 7", RBIH through window, setdown at 11,688', roll bit, stack again at 11,683', again at 11,678' (3X), change TF, get through at 5 fpm 10/27/2019 10/27/2019 0.10 PROD, DRILL DLOG T Log RA for +7 correction 11,700.0 11,718.0 08:12 10/27/2019 08:18 10/27/2019 1.10 PROD1 DRILL WPRT T Wiper in-hole, clean past billet, reduce 11,718.0 13,560.0 rate & speed beginng 12,615', ratty 08:18 09:24 13,126'to 13,300', RIW =4K 10/27/2019 10/27/2019 1.90 PROD, DRILL DRLG T FS = 1088 psi @ 1.9 bpm, CWT = 7560.0 13,660.0 5.4K @ 0.8K WOB, annular = 4400 09:24 11:18 psi, pump = 5924 psi, choke wide open, begin pumping mud system #4, at the bit 13,592', avg ROP = 53 fph 10/27/2019 10/27/2019 0.70 PRODi DRILL WPRT T 400' wiper, PUW = 42K, stacking at 13,660.0 13,660.0 13,544'- 13,589', RIW = 6K 11:18 10/27/2019 12:00 10/27/2019 2.00 PRODi DRILL DRLG T Drilling, FS = 1038 psi @ 1.9 bpm, 13,660.0 13,760.0 CWT = 4.3K @ 1.2K WOB, annular = 12:00 14:00 4291 psi, WHP = 92 psi, pump = 5418 psi, avg ROP = 50 fph 10/27/2019 10/27/2019 2.40 PROD1 DRILL WPRT T Wiper to tubing tail, PUW = 44K, 13,760.0 11,100.0 pulled heavy at 12,700' & 12,626', jog 1400 16:24 build Pull heavy at 11,738', RBIH, stack weight, pressuring up annular, partial pack-off (have returns), can orient, pump 5x5 sweeps, work pipe, pop free working down, RBIH, jogging awaiting sweeps, stack on billet, run through to verify clean, sweeps well up-hole, pull through window (0.5 bpm @ 5 fpm), jog 7", jet XN nipple, difficulty working through window (5 set-downs) 10/27/2019 10/27/2019 0.20 PROD1 DRILL DLOG T PUH & log K1 for+9.5' 11,100.0 11,136.0 16:24 10/27/2019 16:36 10/27/2019 0.50 PROD DRILL WPRT T--RBIH, stack at 11,688', orient TF 10°R 11,136.0 11,688.0 of milled, attempt rolling TF with WOB, 16:36 17:06 no good, pull up to 35K (1.3 WOB), roll TF to "pop" through, no good, attempt again at 30 fpm, no good, PU pump for a bit in 7", attempt 20°L at 35 fpm 10/27/2019 10/27/2019 2.60 PRODt DRILL TRIP T PUW = 42K, pumps 5x5 sweeps, 11,688.0 72.0 1706 19:42 circulate bottoms up POOH chasing sweeps to surface on wiper trip. Found some small cavings in the returns on the wiper trip, first rocks to surface, Geo says B formation. Page 15117 Report Printed: 1116/2019 Operations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Stan Time End Time Dur (hr) Phase Op Code Ach* Catle Time P-T-X Operation (WB) End Depth (WB) 10/27/2019 10/27/2019 1.00 PROD1 DRILL PULD T Bump up, PUD BHA# 12 72.0 0.0 19:42 20:42 Bit clean, no clay, all nozzles clear, one chipped reamer. 10/27/2019 10272019 1.30 PROD1 DRILL PULD T PD BHA#13 D331 clean out 0.0 62.0 20:42 22:00 assembly, sans resistivity and agitator. Inspect pack off - good 10/27/2019 10/28/2019 2.00 PROD1 DRILL TRIP T Bump up, set counters, RIH 62.0 10,645.0 22:00 00:00 10/28/2019 10/28/2019 0.10 PROD1 DRILL TRIP T Bump up, set counters, RIH 10,645.0 11,105.0 00:00 00:06 10/28/2019 10/28/2019 0.10 PROM DRILL DLOG T Tie into the K1 for +11' correction. 11,105.0 11,126.0 00:06 00:12 10/28/2019 10/282019 0.30 PROM DRILL TRIP T Close EDC, continue in hole. 11,126.0 11,672.0 00:12 00:30 Call from Geo / MWD- mistake on tie in, Pick up. add additional +10 feet to depth 10/28/2019 10/28/2019 0.70 PROD1 DRILL WASH T RIH pumping 1.86 bpm FS 453 psi, 11,126.0 11,688.0 00:30 01:12 Start taking weight 11,684'siight moto work, sharp increase in WOB ( 1.1k) @ 11,687.5 WOB climbed to 4.5k tool face torqued up. Down on the pump PU 40 k lbs, clean. RBIH @ 1.8 bpm @ 1ft/min, same results PU Wt 37k. RBIH, creep forward from 11,687'. WOB dinned to 2.8 k lbs, park, WOB increased to 4 k stalled. 10/282019 10/28/2019 0.70 PROD1 DRILL TRIP T PUH while consulting wtown. 11,688.0 11,688.0 01:12 01:54 10/282019 10/282019 0.60 PROM DRILL WASH T RIH 5 times unsucessfully 11,688.0 11,711.0 01:54 02:30 0.5 bpm - 25 ft/min 0.5 bpm - 30 ft/min 0.35 bpm - 18 ft/min 1.2 bpm - 15 ft/min 1.4 bpm - 30 ft/min RIH to 11,687.2' at 1.90 bpm, just shy of obstruction, PUH washing @ 1.90 bpm to 11,660' RIH pumps off, - pass window cleanly. Start seeing WOB @ 11,711' PUH 10/28/2019 10282019 0.40 PROD1 DRILL WASH T Attempt to pull into casing, stuck and 11,711.0 11,624.0 02:30 02:54 packed off @ 11,624' Work pipe, regain circulation, pull free 1028/2019 102812019 0.20 PROD1 DRILL WASH T RBIH pumping 1.8 SID at 11,188'. PU 11,624.0 11,711.0 02:54 03:06 cut pump pas through window clean- Ramp pump rate to 1.8 and RIH to 11,711- 10/2812019 1012812019 1.10 PROD1 DRILL WASH T Attempt to PUH. Packed off and 11,711.0 11,650.0 03:06 04:12 became stuck. getting 1.2 bpm I returns for 1.80 bpm in. Worked pipe from 11,701-11,699 Ct Wt to 46 k, WOB to -5 k, returns increased, worked pipe, domped choke, no luck, returns diiminished. Consult with town, HOT rotating freely, returns stedy at 1.6 bpm Work pipe to 80 k three times. Returns regained as pipe started to move on third try. Pulled free. 10/28/2019 1012812019 2.80 PROD1 DRILL TRIP T PUH chasing sweeps on swab wiper. 11,650.0 78.0 04:12 07:00 1 1.5 bbl cutting returned on swab wiper 10/28/2019 10128/2019 1.00 PROD1 DRILL HULL) T PUD BHA #13, blow-down & LD tools 78.0 0.0 07:00 08:00 I I Page 16117 ReportPrinted: 1116/2019 Uperations Summary (with Timelog Depths) 1 R-23 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start DePlh Staft Time End TMe Dur (hr) Phase Op Code Activity Code Tama P -T -x Opemon (ftKS) End DepM(ftKB) 10/28/2019 10/28/2019 2.70 PROM DRILL WAIT T Await plan forward, pumping managed 0.0 0.0 08:00 10:42 pressure, blow down both chokes & micro -motion, work frozen rain on walking paths around rig, perform quarterly of pipe handler on skate, clear & clean rig floor Decsion made to RDMO, PJSM, discuss plan forward/scope change, begin executing plan forward 10/28/2019 10/28/2019 0.90 PROD1 DRILL PULD T PD BHA#14 Nozzle 0.0 53.0 10:42 11:36 10/28/2019 10/28/2019 2.10 DEMOB WHDBOP TRIP P RIH w/ BHA #14 70.0 11,100.0 11:36 13:42 10/28/2019 10/28/2019 0.20 DEMOB WHDBOP DLOG P Log K1 for+15', close EDC 11,126.0 11,126.0 13:42 13:54 10/28/2019 10/2812019 2.00 DEMOB WHDBOP CIRC P Continue RIH, PUW = 37K, pump 11,126.0 11,680.0 13:54 15:54 multiple 5x5 sweeps, jog 7", continue to circulate in 7", awaiting seawater to dg 10/28/2019 10/28/2019 2.10 DEMOB WHDBOP CIRC P Displace well to seawater 11,680.0 2,500.0 15:54 18:00 10/28/2019 10/28/2019 1.80 DEMOB WHDBOP FRZP P Diesel freeze -protect from 2500'to 2,500.0 53.0 18:00 19:48 surface 10/28/2019 10/28/2019 1.20 DEMOB WHDBOP PULD P PUD BHA#14 53.0 0.0 19:48 21:00 10/28/2019 10/2812019 1.50 DEMOB WHDBOP CIRC P MU nozzle, jet stack, pop off, break off 0.0 0.0 21:00 22:30 nozzle, blow down surface lines, vac stack, bore -0 -scope 10/28/2019 10/29/2019 1.50 DEMOB WHDBOP CIRC P Work rig down check list. 0.0 0.0 22:30 00:00 1 1 ***Rig release at midnightl0-29-2019 0:00 Page 17117 ReportPrinted: 11 /612 01 9 ConocoPhillips ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1R-23L1PBI 50.029-22200-70 Baker Hughes INTEQ Definitive Survey Report 20 November, 2019 Baker Hughes ConocoPhillips I —,ka "5s CpnOCOPhIlllPS Definitive Survey Report COmlwny. ConocoPhillips Alaska lnc Kuparuk Local Co-orUiru4 Resonance: WeII iR-23 Project: Kopeck River Unit WD Reverence: 1R-23®88.00usft(1 R-23) SIN_ Kupamk 1 Pad MD Reimenpe: IR-23(ID 88.00usft(1 R-23) Well 1R43 North Reference'. Tete Wellbore: 1R-23LI PBI Survey Calculation Method'. Mlnmvm curvature DesiOn: 1R-23LI PB1 Database: EDT 14 Alaska Pmduction Projetl Kupamk River Unit, Nunn Shuns Alaska. United States Map System: US Stab Fore 1927 (Exact solution) Sysbm Datum: Mean Sea Level Geo Datum: NAD 1927 NADCON CONUS) Using Wall Reference Point Map Zone'. Naska Zane 04 Using Wodeac scale hector Well 1R43 000 us" Northing: 5,991,6W.19usft Lalftuee: ]0.23'1]076N Wall Poison. +NIS 0,00 Easting: 539.829.67uaft Lon9huds: 14V 40'33,721W +EI.W Position Uncertainty use 0.00 use Welmed Elevation: usft Ground Level: 000 Use - Millions 1R-23LI PBI Magnegcs Model Name Sampo Dew Decimation Dip Angle Field SbangM (°) (•) 1.11 BGGM2018 11/1/2019 16.39 8088 57403 Design IR-23LI PBI Audit Names: Vantin: 10 Phase. ACTUAL Te On Dentin: 11,6W.W Without Saplion: Depth From lND) +WS 4 411 olrecdon (uafl) (WR) Wdl) (°) 8500 000 DW 20,00 Suety Progwm Date Survey Sury ey From To (.0) (..it)Survey Williams) Tool Name Description Bwrt Dela End Dab 10000 11.600.W IR -23(I R-23) GCT -MS 6chlumbergerGCTmulashol 1182001 11682.W 1177024 1R-23LIPBI MWO-INC(1R-23L1PBI) MW INCONLY (INC>10°) Ml INCONLVFiLLER( INC11W) 10117Y1019 102012019 11.800.20 14.045.15 1R-23L1PB1 MM(iR-23LIPB1) MWD OWSG OWGG MWD -Stencil 102012019 101222019 Page 2 COMPASS SOW 14 Said 85M 1002019 1:35: 18PM C0noc0Phillips ConocoPhillips Definitive Survey Report .4M."�91aaa Company CoowPhgos Alaska Inc_KupamM Local Conminam Reference: Well IR-23 P".d: Site: Kupmok Ricer Une Kupmuk 1 Pad WG Refinam. MD Rdarence: 1R-23@W.00ueft(1R-43) IR-23@88,00usft(1R-23) Well: 11R33 North Reference: True WOW.: IR-230PB1 Surrey Calculation kmthod: Minimum Curvature Design: 1R-23Li PBI Demos... EDT 14 Alaska Pmdudi0n Survey MD hart) Inc fl Axl PI Wo (uaftl Wow )rift) .1114oUM (deft) (uaft) Map Nor111ing pq Map EWing MI DLS ('1100•) Sect) n Survey Taal Name Iftl AnnOtatiOn 11,600.00 61.91 4528 BRI 08 6e.a 5,511.92 6088.29 5.997.110.07 546,687 8a 000 7,52860 MW0-INCONLY(INCat11121 TIP 1168200 8160 44% 37MI65 0,612.65 5.56291 8,919.48 5,997329.33 54671.M 0. 7594.03 MND-INC ONLY(IN01P) (2) KOP • 11 710,6g 6780 4563 677300 6.68500 5,561]4 6937.68 5997.24186 ..7VW 2858 ?611.65 MW INC ONLY21 mtepolated Apmaim 1114014 8118 45.50 6780.87 8692.01 51)0115 8,957.68 5981,28777 so 758.94 46,39 7.64310 MWDJNC ONLY IIN6f0•)(21 Intop0181ed Aeimum 11,77024 9080 4800 6.702.97 6594.87 5622.08 697837 6997288.81 54677031 3297 7,67011 MWT INC ONLY(INC>10•)(2) Int0p0laled Avm6m 11.600.20 9147 4797 8.782.37 689437 5.84251 1,00127 5,997.3..36 548.86010 6. ?898.80 MWtI OWSG IT 11,03021 90.46 4950 6.78187 6,03. 5,86230 ?023IU 5.997.329(26 540.822.55 611 1.7M 11 MNG O.60131 11.88575 88% 5163 6782.32 8...V 568467 705127 5987.35197 .6849.07 8.94 7.75371 MWD OWSG(31 If BP4.75 .0. 54.33 6,782.93 6.694.83 5303 53 7,076.01 5,88737077 506.07451 1001 7.779.70 MWD OWSG (3) 11.925.39 9123 .73 6,78271 669471 571974 7,00962 5,9973117 10 540.09803 1007 7,03301 MWD OW5G (31 11055.99 9040 .5872 8,782.26 8.094.28 5.735.85 1,12562 g.07,403 35 .6.03.95 16.. 7.827,04 ~OWSG I3) 11,997.46 .1.70 62.97 618114 e.l', 5.750,45 7,15234 5.997,410.0 546950.50 1550 7849.90 MND eWSG(3) 1201575 91 I6 As. 677972 869172 5.76380 7,17843 5,997.43145 540,97659 8,89 7,871 25 MWO OWSG (3) 1204995 tl696 8320 817948 669149 517908 7...Is 599744102 .7007.04 6.25 7,890.17 MWD OWSG (3) 1200037 9003 6735 a 779 76 6.08110 5,78181 1,23659 5897459.89 547,97459 14.09 1,91758 MW9OWSG (31 12,111.10 0951 0.85 6,77988 6691.89 5.80327 7,265. 5.997A71 60 S17.063M 5.17 7,938.10 MWO 0WS3(3) 12.14028 0714 69.75 6780J4 A.1'1 581358 728237 5,.7'.81.95 .709026 80 705712 MM MSG (3) 12.170. 0590 68. 8182,55 3,694 55 582125 7,32054 5997.492.77 547.11831 5.05 7.97678 MNO OWSG (3) 12.200.05 86.90 6569 8,764.39 68.39 5,63544 734767 5997.50411 .7 14561 764 7..6.& MWD OWSGM 12,23019 BBW .48 6me2a 669729 564765 7.37541 5,11. 510 .7.173.11 10.. 6017.54 MWD OWSGI3) 12,25007 88.05 0.40 6185.63 66970 5.080.55 7,40238 5,9.,52950 5219999 7.25 6.036.87 MWD OWBG (3) 12.29811 8780 6174 870.51 ..,98 51 5,87438 142901 S9I.47 50,7$058 7.31 8.godo .97909786(3) 12,32071 ..46 6041 6.787.02 6699.02 5,889.11 7,45578 599],558.41 5225325 1031 0.004.04 MNO OWSG (31 12,35094 9043 5728 670.18 6,69619 5,.4.01 140165 5,89757419 .7279.03 1042 8.107.59 MWD ON5G(3) 12,379.52 9020 54.54 670.81 8.68881 5,920. 1,505.31 5.997 590 M7 ..81 9,53 8130.73 MWD OWSG 13) 12,409 45 0.7 5134 61..35 8.89835 5.938.87 7,52819 5.991,one .48 .?326.39 1079 8,15585 Mr4D OWSG (3) 1243852 3043 095 8788.05 66.97 5.950.14 7,55227 5..7.877.0 547,34936 8.00 8.181.85 MbD WSG(3) 12.46815 .75 4708 678601 6,69001 5,97796 7,57430 8,997.04782 M7.37128 671 0,208.0 MM OWSG (3) 1249945 8958 o72 67M 45 6.8.a. 599668 ?58642 59870683 647 393 4.10 5.,ao Ga MWD 09760(31 12.52985 0733 4431 6787. 6699.54 6019. 7.617.. 5997689.88 .741470 6.95 6262.26 MWD OWSG(3) 17/201019 1:35: )BPM Pegg 3 COMPASS 5000.14 Build 85H Survey MD (usn) ConocoPhillips AN (1) .: ConocoPhillip5 Definitive Survey Report -NI-S (use) Company: ConomPtlllllps Alaska Inc_Kupemk Local CO -ordinate Referi WallL1 R-23 Plppm: Kupaluk Riv Unit WD Reference: IR-23®B8g0uffi(I R-23) Slle: Kupamk I Pad MD Reference 1R-23®88.00lufl11 R-23) Well: 1R-23 Nonh Refamnce. True WellboR: IR-231-11PB1 Survey Calculatlon Method: MIOInAm Cunalum Oasign: 1R-231-1PR1 DabEase' EDT 14 Alaska Pm6udlOn Survey MD (usn) Inc (9 AN (1) WD (cell) TVDSS (u:el -NI-S (use) V -W (Man) Map Npnhing MI Map Eaming mt DLS I°flop') wilt l SedlOn Survey Tool Name Annotation un 12.55921 883] 4159 578065 6,700 65 6041.42 7630.07 5,997,711.61 54],43421 9.05 828846 MAC OWBG (3) 12.589.80 8802 3801 6,789.01 870191 5,06"81 ?65]62 5,99]73490 542.454.16 An 83170 WVD OWBG(3) 1201966 a803 3731 8791.25 6.70325 808826 7,67618 5.937,76864 547.472.56 830 034850 MAID OWSG (31 12,84927 08.88 3489 9.M.C4 8704.04 611220 ].693.56 5997782.68 547489.03 931 8.37495 MND OWBG(3) 12,68041 W, 8. 3213 679210 6,704.10 6,130.19 7,71072 5,997.890.76 A7GAS W 1043 040523 MWD ONSG(3) @.71062 BO.03 20.46 6,79165 6,703a 01.13 7]2619 5,9W.02A 70 50,52216 877 0434.80 .0W8G 13) 1274009 9025 26.39 879136 5.70336 5,193,07 7,710.37 5,897,88169 UTWO Z 10.39 8480.80 MND 0WBG(3) 12.1076 0939 2440 6.79140 070346 6.21705 7.753la 5,90700564 UTUB.06 726 8,49461 MVA OWBG(31 12.80563 90.37 W4. 679153 8203.53 635008 1,76648 599]820.0 547,56199 1184 8.5280 MND OWBG(3) 12.83071 91.14 1027 5291.20 870320 627374 7,77479 5987,844.63 5257010 9.25 8554.52 MWD OAGG(31 12;86005 8231 1544 6,790.20 6)02.20 dam Id, 770353 599792350 547,57876 10.17 058460 MM OW6G (3) 1200.0 9501 1313 al. 4 870034 833185 779094 5988002.62 52588.02 11 GO 851445 MND OWBO(3) 12,915Y 97.39 fill 6.568 569788 836554 7,79821 5,998028.53 50.59115 1134 0,808.71 MND OWSG(3) 1294061 90.64 1000 6782.19 6894.19 637992 780688 5998.050.94 547695/0 840 and 22 MWD 0WSG(3) 1297081 9000 071 6,7164 8.699.E4 540.25 ?805.19 5PW,OdO.M 547,59985 1005 8.692.26 MWD OWBG P) 13,00101 4882 370 577290 580198 Ann 7,80791 5998.11021 50,602.41 970 012130 MND CABG(3) 13 ON 9870 142 6.M 49 668046 6,40836 780922 5.90013941 547,60356 79 574918 MVA CMG (31 13,06075 99.54 3.57 6763.0 6,67569 649112 7,01052 5998169.11 5260470 757 01759 MWD MSG (3) 13090.72 9972 508 575614 6NOW 8527.56 181295 5990190.63 528040 7.62 8.008.09 MWD ON5G(3) 13,12046 99.M 783 6,76383 566583 6.656.69 7,01845 5,998.22770 WAI0,32 6.06 083463 MND 0NS3(3) 13,15156 9842 1002 6,74011 866111 6.58706 7.821.22 5'.996,258.16 52614.93 724 0,084.82 MVA OMG(3) 1318049 9756 11 B3 9.74509 6,65709 A.15.10 7.82860 5.998.285.31 52,62024 in 8,893.12 MND 0W60(3) 13,21117 a556 1396 6.74132 689.32 88485 1,833.50 5998,316. .7 NO 1M 0.9'23.33 MND 0056 (3) 13,24077 9542 15 a5 6.738.23 6650]1 6,073M 7841 ..7 5,999.3449 .7 WAV 146 0,95265 MWD OWSG (3) 1327065 8418 1015 0]35.73 6.64773 6.70177 704970 5PW,373.01 52.842,87 8% 8.882.39 MWD OWSG (3) 13,301.73 "In 2022 BA346 6,64546 6,73180 7,85995 5,0840234 547,652.90 864 901330 MND OWBG(3) 1333111 94.30 23.49 0,731.25 664335 675879 787109 5,998.43014 .7ON.88 1089 9,04326 MWD ON5G(31 13,36L50 8393 2540 6729.10 804110 8780.13 1882.95 5998.45754 52,67559 1.21 8.0730 MWD OWSG(3) 13.39160 92.24 2153 6.72749 5639.49 8,013.82 7,0440 599548529 "TAW . 839 9,102.94 MWD OW5G(3) 1342163 9037 2052 6,725.80 653680 6.64184 7,965.11 5990513.31 "7697.51 iW 9,13286 MND OWBG(3) 1344951 9104 1905. 8726.45 5630.46 6,86807 1.91461 5.08.539." "?70601 579 9.160.83 MAD OWSG (3) 17202019 195 18PM 114964 COMPASS 5000.14 B.,W 85H Survey ConocoPhillips r CpppC0Ph1llIP5 Definitive Survey Report Co.,.,: ConoccPh1111pa Alaska lnc Kupamk Local Co-ordinate Reference: 1A9111R-23 Project: Kupamk River Unit ND Reference: IR-23@8800uct OR -231 Sge: Kupamk I Pao MD Reference: 1R-23 Q 88.00uafl(1 R-23) Mil: 11143 Nodb Reference: Too Wellbore: 1R-23L1PB1 Survey Calculation Matson: Minimumcto.ourc Design: IR-23LIP51 Cabbex: EDT 14 ANaka Pmdudion Survey 11,201019 135, IBPM Page 5 SoketHa9ke.8 Annotation COMRISS 500014 good 9:77/ Map Map VaNcal MO Inc Atd NO WEISS NI -S 4EI-W Northing Eaegng DLS Section gp4v6y T.1 Name (.ft) (1) (1) (-aft) luaftl luaftl luaftl IRI (ft) Now) MI 13,401. NO 1824 6,]26.03 8638.03 6,69832 7,925.12 +,9905&9.9 SoT111.16 161 9.192.80 MW➢OW6G 13) 1351183 .58 19.28 &225.75 6,63/75 8926.68 ?93523 5946.596.55 M7 727 Ia 9.223.14 MWD OWSG Di 13.54166 fiB 45 ta66 6,22524 563224 8.6496 7.945.35 5.99&BM.x .7737.09 380 9252.9 MWD ON5G (3) 13,52174 68.02 2020. &325.93 6,637. 6.983.20 Tomto 5,98865492 547742.24 163 928305 MWD OWSGI31 1360120 9c0 1997. 8.225.9 13.6379 7,01141 1.86.5..7 5996 Wo 24 54p5240 092 931308 MWD OW5G 131 13,63349 x49 on a 622564 6,632.85 20411'. 7,9229 5998,112.99 547.260.36 s 9,N4.80 MK90WBG(3) 13661.50 90.58 2105 e,M5.58 6.637.56 7.7. 2,982.16 5,891.25 542.778 31 a 931188 Qua) 0WSG(3) 13.180 x.40 2095 6225.32 8,63732 7.09530 2.99&00 599.26789 .7,2690fi 900 9.40328 MND OMG(3) 13.21613 x.64 2168 6725.10 6.63710 2.11820 &006.85 5.9x.79.23 .7]W 11 318 9,42242 MWD OWBG0) 13.74573 89.85 2216 &324.98 6,839.. 7.14566 gotten 59x.8925 Wage 62 3.12 9,45263 MWD 0WSG(3) 13,22560 9609 22.04 6,7249 6639.. 711324 6.@936 5998,64539 547.01992 273 940684 MWD OWSG(3) 13,0M.48 9015 2263 6.2N 93 663683 220171 8.. 132 5,996073.92 513.83173 102 9,51769 MAD 0W6G(3) 13.830.4. 9312 229 6,22463 6636.82 2,22385 8050.54 SB90,Bx.10 547,.0.01 6.13 9.541.84 MVA OW6G(3) 13x082 0981 2289 6,224. 6,036.06 7,251W 6,x221 599.923.93 .7,852. 1.11 9.57177 MWD OWSG(31 13095.84 Won 2321 6,224.86 now 7,26400 895.64 5.9x.956.38 .7x561 201 9.801125 MWD OWSG(3) 13,93556 W03 2188 0,32482 town 7.320.99 0,90.. 5.998,993 45 542,8x.42 0. 9,04565 MWD 0956 (31 13960.52 6985 21.56 6224.85 8636.. 2.39.11 6099. 5,99961&88 547,x955 176 967159 MWD OWSG (3) Is .85 6900 2154 6724.91 6636.91 3.x742 6109. 5,899x993 542.8a861 914 9698.59 MWD OW3G I3) 14,01552 man 2157 6,7251M 8,63704 2.395" 8,120.11 5,999,082.93 54790046 094 9726.52 MN90WBG (3) 14,04515 09.57 20M 632526 563726 7423.00 &13069 5,99.x5. 542.91992 429 9.766.20 MMOMG(3) 14,088. 8957 2030 8225.56 663258 7463.19 6.145.58 5.99.135.9 :M793457 0. 8,298.. PROJECTED to TO 11,201019 135, IBPM Page 5 SoketHa9ke.8 Annotation COMRISS 500014 good 9:77/ ConocoPhillips ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1R-23L1PB2 50-029-22200-71 Baker Hughes INTEQ Definitive Survey Report 20 November. 2019 Baker Hughes a$ ConocoPhillips kokuw kns v 1 ConocoPhIlllps Definitive Survey Report Company: Conowlshillips Alaska lnc_Kuparuk Local Caamhmute References: W41I tR-23 Project: Kupamk River Und TVD Redeemer: 1R-234D88.00usfl(I R-23) SBa: Kumek 1R Pao MO Reference: 1R-23(@ 88.00usfl(1 R-23) Wen: 1R-23 North Reference: Tree Wellbore: 1R-2311 PB2 Survey Calculation Method: Mmimumcurvature Design: 1R-23L1PB2 Database: EDT 14 Alaska Production Project Kupamk River Unit North Slope Alaska, Uneed States Map Strauss: US Sete Plane 1927 (Exact solu6an) System Datum: Mean Sea Level Geo Datum: NAD 197 (NADCON CONUS) Usmg Wkll Reference Paint Map Zone: Alaska Zone Using geodetic scale fade MH IR23 Well Position .NIS 000 usfl Nanning: 5.991,630.19us8 LatBude: 70'23'17.076N .V -W 0.00 ren Easting: 539.82967usfl Longitude: 148°40'33721W Position Uncertainty 0.00 usfl Wellhead Elevation'. usfl Ground Level: 0.00 usfl MMlboe 1R-231-1PB2 Mpllee.. Model Name Semple Dab Daclinanon DlpMple Field Sharl9M (9 (1) Inn BGGM2018 11,112019 16.37 8088 57403 Design IR-231-1PB2 Audit Notes: Version: 1.0 Phaae: ACTUAL Th, On Depth: 12.17045 %mcal SeMan: Depth Fem(TVD) .WS . -w Direction (all (mull IaeR) fl IS DO 000 000 15.00 Survey Program Dab Fran Th Survey Survey (--ft) (malt) Survey(Wa06oe) Tool Na.. Description Stan Data End DO. 10060 11.600.00 1R-23 (IR -23) GCT -MS SChiuml:efgelGCTiehflland 1182001 11482.00 11,77024 1R-2311 PB 1 MWD4NC(I R-2311PB1) MW INC _ONLY (INCNO-) MWD-INCONLYFILLER (IN010-) 10)1712019 10(202019 11.800.20 12.17046 IR-23LIP81 MM(1R-23L1PBi) MWD OWSG OVSG MND -Statement 102012019 102212019 12,190.00 12.984.88 1R-2311%2 MVA I1R23L1PB2) MWD OMG OWSG MIND - StandaM 102312019 10242019 11202019 1:36:06PM Page 2 COMPASS WOO. 14 Build 05H l ConocoPhillips i y ConDC0I�N��IPS Definitive Survey Report Co.,.,: ConoicPhillps Alaska Inc Kupamk Local Coaoimle Rafaren4x: N@0li Plojed: Kuparuk River Unit WD Reference: 1R-23@88.00aiOR-231 SBe: Kupamk 1 R Pact MD Reference: 1R-23 Q 88 O 0R-23) Well: 1R-23 No.h Reference: Tore Wellbore: 1R3XIPB2 Survey Calculation Method: Minimum Curvature Deals., 1R$3L1PB2 Databau: EDT 14 Alwort Production Survey llRi lg 13606PM Annotation TIP KOP COMPASS 5000.14 El 8514 G Map Map Vertical MD I Il Atl WD %088 4Ni �_W No(11) a+let OLS Semon surrey Tool Name (ti l 11I 1°I jump lueel (-ft) lural I-mm,I IN 120048 .90 6076 6]02.55 66&.55 55.26 ?320.54 5 7.49L77 541,11837 5.05 7,52049 MWJO .0 (3) 12190.00 .6. 6739 ..no 2 6895.02 533153 7.33863 59W,5N.15 54.1.42 166 753220 MWD OWSG 141 12222.12 ... 89.10 678 a 56%.80 534388 7.68. 5997.5120 547.1.06 9.63 Tor St MWD OWSG 14) 1225142 91 fib 8625 6784.56 SAW. 5,655D5 ?39x.34 5997,523.91 547193.00 945 7.569 E0 MWD OWSG 14) 12280.02 9270 Sir Is 8,78344 6.69544 rlor?M 7422.01 59978%42 547,219 fA ?84 ?598.40 MWD OMG 14) 12,311.05 9111 60.81 0.70249 6.69442 580130 1440.82 5981.550.50 54,246.33 1200 7.009all MWD OWSG HI 1234057 918] .2a 678164 raw. 50%.25 7,4425 5997565.59 54727188 925 1,62982 MWD OWBG(41 12,370.51 9184 Si 6780.07 668287 5,91259 7.499.32 5.997,682. "729865 as, 7,65209 MWD OWBG (4) 12.400.76 9114 W63 677980 669180 P.M 33 752381 59%59992 M7,32106 9.96 7,67655 MYA OWSG 141 12.43011 9132 .73 0)79.24 669124 5,948 t3 7.51718 5,991.81885 547,344,32 960 7.88977 MM Oli(in 12.46038 0.47 4777 6.718. 689000 5.9064 7.56942 5511783047 "7,36645 9.82 7724.37 MM GMG(4) 12,49040 W7. 4391 6,77638 8,881 598951 7,590.92 5.91465946 517,20704 13.04 7750.10 MWD OW5G I4) 1252088 9318 4041 8774.62 8,693.82 601201 7,61129 5,997602.% .7401 11.95 1777.10 MWD OWSG 14) 1255040 9359 4105 6,77272 58".72 8,034.39 7.30W 5997104.. 547427N 2. 7.80371 MWD OWSG(4) 12500.01 9344 4427 677085 6,882.05 6056.71 165113 599786.97 M744.W 1059 7.0059 MWD OWSO(4) 12805.89 8209 mul 6769.64 688184 5014.30 186902 5,9977.73 Wilds 48 10.17 7.35229 MWD OWSG 01 120.05 92.0 49.13 8.168.34 6fi00. SAW as 1.126 5997765.02 "7487.61 027 187753 MWD OWSG (4) 12666.19 91." 4653 6,76716 BVol$ 6,11436 771393 5,99778497 54,51017 4.81 7W2, 55 MND OWSG 141 128%,27 91 fig 45.b 8700.33 8818.33 6,134.91 7,735.90 5,8%.80581 54753203 10.55 792005 M.0VSG on 12,726 On 9187 4186 6.78541 BBP 41 61%41 71:5.40 5897821.22 .7,55241 11 72 7064.14 MM 0NSG(4) 12,76003 %26 3664 6.1113.89 6675.89 61.51 7.778.37 5,991.85328 "1,57424 1035 7,984.80 MND Ofai(4) 12.79011 .60 38.51 6.762.11 6874.11 62W.16 7.70 as 599!.011.17 M7,592.42 711 601251 MVA 00050 14) 12,818.% .05 3307 676021 San 21 8$2967 7.8139 5997,90DJ8 54M M 9.33 800963 MND 0003(3 (4) 12851.18 star 3145 6,757.16 ...a 70 62.72 7.83088 59979991 517826.07 100 8,070.23 MWD OWSG(4) 1288042 9566 2822 o7won 851701 5201.87 1,845 00 598795323 .7..041 1131 600637 MWD OWSG(4) 1290994 9584 254 8]52.05 8.¢84.05 0,30011 raw. 5,997.91951 Straw." 92a 612712 MND OWSG (4) 12,0561 won 2913 674941 6,85141 6.33144 7,8"85 59860020'3 "7.6392 809 8,15231 MWD OWSG Iq 12964.6 96.30 W52 674627 8,8627 am 0 1.019.67 5986029% .?61459 0.92 0.10120 MWD OWSG (4) 13010. W30 .52 6.14132 6653.32 6A..46 16%39 Sol as "789609 6nn a,225" PRO3EC1EO10 TD llRi lg 13606PM Annotation TIP KOP COMPASS 5000.14 El 8514 G ConocoPhillips ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1R-23L1PB3 50-029-22200-72 Baker Hughes INTEQ Definitive Survey Report 20 November, 2019 Baker Hughes ConocoPhillips Company: ConocoPulips Alaska Inc_ Kupamk Project: Kupamk River Unit Sita: Kupamk 1 R Pao Well: 1 R-23 Wellbore: 1R-2311 PB3 Daelgn: 1R-23LI PB3 Project Kuparuk River Unit, North Slope Alaska, United States Map S'Ndi US Slate Plane 1927 (Exact solution) 8yarem land Geo Daum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone Well IR -23 ConocoPhillips Definitive Survey Report Local ConNlnefe Foundation: Wall 1R-23 TVD Reference: 1R-23 @ 88 00ush (1R-23) MO Reference: 1R-23 Q 58.00usft (1 R.23) North Reference: Tore Survey Calculation Metbad: Mlmmum Curvature Database: EDT 14 Akska Preelection Welt Position .W.6 000 Left Northing: .E1W 0.00 unit Esedng'. Position Uncertainty 000 usM1 Wellhead Elevation: Wellbore 1R-23L1PB3 Dab Me9lNtles Model Name Sample Oats (us11) BOGM2018 11112019 Design 1R -23L1 PB3 1 R-23 (1R-23) Audit Notes: 11P024 1R-23L1PB1 MM-INC(1R-23L1P81) Version. 10 Phase: ACI UAL Vertical Section: 13.72047 Depth From ITVDI (usft) 88.00 Survey Program Descriptions Dab From To MiA INC_ ONLY FILLER(INC>10') (us11) (isiI Surs"(Wellans) 100.00 11.800.00 1 R-23 (1R-23) 11.68200 11P024 1R-23L1PB1 MM-INC(1R-23L1P81) 11.80020 12.111.10 IR-23L1PBI MWD(1R-23L1PB11 12.13000 13.72047 1 R-23L1PS3 (1R-23L1P83) Mean Sea Level Descriptions Using Obll Reference Pent Schlumberger GCT mullishot Using geodehc soak factor MiA INC_ ONLY FILLER(INC>10') 5,99163019usft Latrade: 539.629.67usft Longitude: cash Ground Level: DaUiruBon Dip Angle r) (1) 16,37 8088 Tie On Depth: 12,111.10 -NI-5 (usft) 0.00 .EI -w (Lstli 0 Co Tool No. Descriptions GCT -MS Schlumberger GCT mullishot MWUINC ONLY INC>10-) MiA INC_ ONLY FILLER(INC>10') MWD OWSG OWSG MWD- Standard MWD OWSG OWS(3 MIND - Standard Dlnrnan V) 15.01) Survey Sad"one 1A62001 101172019 10202019 1012512019 m4erwpin5s 70° 23 17076 N 149.40'33721W 000 Lad Fkald Strength 071 57.403 Sai End Dab 10202019 10122M19 102812019 11/102019 1:36 52W Page 2 COAl500014 Sudd 85H Annotation TIP KOP 1120,2019 1:36'52PM Pape 3 COMPASS 5000.14 BMM 85H ConocoPhillips i COn0O0Ph1llips Definitive Survey Report Company: C...Phillps Alaska In. K,.k Local Coof6mate Reference: VM111 R-23 Project: Kuparuk River Una NO Reference: IR-23@8800usft It R-23) Sites Kupamk lR Pad MD Reference: 1R-23@88OOus0(I R-23) Wel; 1R-23 North Reference: Tme Wellw.: 1R4!3LIPB3 Survey Calc.1.1,.n Me0lod; M'mimOmculva(ure Deslpn: 1R -23L1 P83 Dam9ase: EDT 14 Alaska Pm0.cbOn Annotation TIP KOP 1120,2019 1:36'52PM Pape 3 COMPASS 5000.14 BMM 85H Map Map vertical MD Inc SalND 47056 4975 497-W Narming Eastinq OLS UadOp Survey Tool Name luanl 1°1 (1) (daft) Idaft) (Uan) (deft) (it) (ft) f1loo') (ft) 12.11110 8951 88.85 6.]7909 BWI B9 500327 1265.09 1..7,171 SO :.7.304 5.1I ?48587 MWD OWSG (3) 12130.00 8797 6943 878030 .,MMSO 561000 1.28275 5,997,41032 U708065 Bit 7.49694 MWD MSG (4) 1216056 W65 .4. 8]81. 689314 58210 1.31104 5,99148992 547,100.88 10.54 7,515.33 MAD MSG (41 1217.20 .77 6374 5..a0 689595 5.033.89 7331&5 5,99750250 :4]135.62 1122 7.53428 MWD OWBG pI 12221St W68 62.00 8788.30 0.MW 504197 1,36582 5897,51674 .7.163 52 517 7,555.12 Mo I4) 12,2517 .21 62.44 8789.18 .7018 5.86159 7.39212 5,9753040 547,18974 157 7,575.00 MM MSG (4) 1228032 82.44 .19 6793.. 6 705 N 5.01448 741775 5997.54351 547,2157 8.97 ?594.16 MVA OWSG (4) 127284 8323 11942 6.79710 &7W.10 5,88116 7.740 5,991.556.31 541,24488 1&14 7,61411 MM MSG (4) 12.34224 .301 W97 6,00.82 6.712. 589602 7,474,50 5.01,561 .38 547271,91 031 1.631% MWD OWBG (4) 12.37156 9074 .31 &72.23 6.71123 5909.18 1.01&5 5.997 578 541,299.00 SO Be 7,64940 MWD MSG (41 124.37 9107 .09 6,7173 6,71373 5,92135 7.6. SO 597.50098 477.327.1 123 103865 MWD OWSG UI 124310 8773 W.20 6.8020 6114.03 5.933.67 7.5583 5,991,803. 50.5385 IS. 788729 MVA OW 14) 124617 WI,, an 6.003.% 6115.% 5.94771 7.58315 5.997.81762 547,38026 874 770771 MVA MSG HI 12,49128 0157 SO 6,805.16 671716 5,961? 01 160873 5991.2 .0 .7.67. 445 7,728 14 MND MSG (4) 12521.23 6963 5696 680.0 6717. 5,9777 7634.61 5.991.&724 .743159 883 7149.30 MWD MSG (4) 12,55104 91.13 5755 6,7569 6711% 699314 1.66..55 599165346 54745754 6.55 7.77165 MMMSG (41 12500.0 9224 5509 87486 611685 600876 ?04.14 SSW07. 20 .?40.94 .P9 7.192.82 MWD MSG (4 1261033 .OS 53.17 5.72 .96 6.114. 80X.46 7,708 62 5,99769143 .7.50.32 In. 7,O1625 MWD ON (4) 12,.8.33 36.38 SO17 6,79948 6711.40 6.04430 1.73244 5.99771499 .7.529.05 1144 7.83965 MM MSG 141 1267.36 10282 .15 6,m.. 670,95 6.062 02 Tm615 5997.132.. M7$5261 1476 706288 MND OWSG I41 12700.90 1W.4. 5103 675625 6696.25 &7999 7779.53 59971%.7 .751541 1249 7,886.31 MM MSG (4) 1213.60 107 4966 6,77765 6,65985 609816 7.80177 5,9917..21 .7.598.06 7.10 ],90961 MWOMSG (41 1276114 108,83 0.59 6168.85 6,00 SS 6.11729 7,823.49 59971.46 .7AI. 70 8.% ?93352 MND MSG (4) 1279133 .a So 45.84 810.45 667245 &17.1. 7,.4.52 5.997808.30 .7.0.63 697 7,958.30 MWD MSG 141 1202124 1095 4454 675280 6,1364.80 6.15755 7,885.11 5997826. 547,661 1. 691 7983,38 MWD MSG I41 12.85058 10172 44,07 674628 6658.. 6.118,01 1,80607 509184850 50.6907 776 800.31 MM MSG 14) 12,7020 .87 4303 674073 6.65273 6.19911 7,905.13 5997,87071 .1.100.7 713 8033.08 MMMSG (4) 1291105 9788 .. 11.7357 6,64197 8,22149 1.925.83 5.997,8019 .752147 665 8,0085 MWD ONSG (4) 12.940.80 031 3989 5..x 16. ad 624370 7,945.21 5.997.915.0 54774050 10.24 8,01.33 MWD MSG (4) 127103 9607 3634 672904 5.54104 628701 7,74.23 5997,930.91 .775963 5.18 8,11416 MND MSG 01 Annotation TIP KOP 1120,2019 1:36'52PM Pape 3 COMPASS 5000.14 BMM 85H ConocoPhillips ConocoPhillips Definitive Survey Report Company: C,ma.Phlllips Alaska lnc Kup... Local Co- dlnete RaNmnce: Mil 1R-23 P.ofeGtt Kupamk Rive. Unil TVD Retools. iR-23@8B00ua8(I R-23) Site: Kupamk I Pad MD Reference: iR-23 Q 8B.00usg(I R-23) Well: IR -23 Nonh Refinance: Tme Wellbore: 1R231-1 PB3 Survey Calculation Method Minimum Curvature Design: IR-23LI P93 Datum. EDT 14 Aunka P.ducbon Survey Map Map Venlcal MD Inc Aai NO TUDSS aN.S iV-W Northhlg EMU, DNS Semon Survey Tool Name Annotation Juan) PI 11) (.aft) (usn) (uan) (Mart) (Itl IN) (^nw) IRI 13.00094 Will 3535 6,725.87 6.63787 6.290.81 190207 5,992962.01 5277739 9. 8.142.37 MWO OMG (4) 13,03103 89.13 3372 6,722.66 6634. 631540 ?999.03 5997,98754 547794 16 539 8.170% MWOOWSG(4) 136609a 9597 3095 071951 0,031.51 6,34059 601493 5,998,01275 U7 Mo 94 923 6.19895 MNA OWSG(4) 13.091 D2 8569 2835 8,716.45 662645 636654 802979 5.898J138.83 A282980 065 8.227.80 MVA OWSG 14) 13.12099 9569 2571 0.71349 6,825.49 6,393.11 8.043.27 5.89806542 U7837.98 S 7 0247. MVA OW6G 0) 13,150.5. 9523 23.25 6.71086 6.622. 0419. 805548 5,990,09233 Wile)W 841 8,28612 MVA OWBG(a) 13,10061 .88 211. 6.70 .02 662002 644755 8.99679 5,99812000 52.122 702 3.315.79 MWD OWSO(4) 13210.'a 9406 1820 6,705. 6.617. 8.47585 8.076.92 598814843 54737118 10.17 8,34575 MWDOWSG(4) 13,24067 94 a3 150 8703 a5 661545 6.5.45 8,08570 5.090.17698 54787982 131 8,37555 MWD OMG 44) 13,27076 93.75 1511 8701.30 6.813.30 6533.37 009375 5.90.20 547.88772 3.82 8,405.56 MVA OWSG I4) 13,300. 9160 1209 8,699.91 6.611.91 556239 8.10073 5.99823999 52894.58 12.39 8.43542 MVA OMG HI 13.33078 8975 9.85 6,69x.55 0,61155 65919a 61.50 5998.204. 547.50015 965 8485 44 MNOOWSG 14) 13,360,70 06.16 106 5703.10 6612.10 662158 811107 5990294.22 52994.51 097 0.49525 MWD OMG (41 13,30 .70 8810 Sa3 0,70108 8,613.06 665138 811450 5988324.04 52&17.33 749 052493 MWD OWSG(4) 1342100 .900 220 6,701& 6.61384 0,08152 611551 5,998354 .19 547939 fib 1199 0654.56 MWD OWSG(4) 1345563 0970 016 6702.21 051421 5,116.14 6,11122 Sawmill 81 .7 910.21 631 0WB 19 MWD OW5G(9) 13.48061 89.11 359.23 570245 6.61445 674112 0,11709 5998413 T. 517,909.94 459 661229 MND OMG 14) 13.51065 0.37 3..23 070.12 6,61512 577114 611643 5.998,443 .80 Sal 909.13 9.01 864111 MWD OWSG(4) 13540.60 0579 357,06 S7. Ill Al.. 08m03 0.11522 5998.2361 541.90776 953 B.W9. MJVD OMG (4) 13, Sm 70 8332 1... 8107. 6,619.50 Gam VS 0,113.85 5880,503.50 52386.03 822 009816 MWD OWSG(41 ".Ob 8150 35590 671140 6,62340 Sam l 6.11191 590.532.93 547Mi404 6.81 8726.04 MWD OMG (4) 13,530.68 .108 35227 6115,97 6,five7 8090.10 SAN 73 59.56210 5290079 11.99 8754.02 MWD OWSG(4) 13,0302 99.81 3.50 6,720.65 6,632.65 6,919.19 8.104.34 5.08,59177 547,896 25 5.68 8,73098 MNO OW5G (4) 13.69047 .el 351.85 6.725.99 6,637. 094045 8,09982 5.99882100 52,9919 4.23 0,80007 MWO OvB (4) 1372047 82.26 353. 6.729.97 664197 6.87737 80805 59966.40 541..1. 7.63 6835.52 MND OWSG(4) 137._. 82.26 35354 8735.29 884729 7.01578 9,0169 599068929 52683.03 0. 0,87197 PROJECTED to TO 11OOROIP 13552PM Page 4 mk..RaSig COMPASS 5"..14 BWM 85H 6 RECEIVED NOV 2 2 2019 AOGCC Baker Hughes Date: November 20, 2019 2 19 128 31483 Letter of Transmittal To: From: Abby Bell Harvey Finch AOGCC Baker Hughes 333 West 7" Ave, Suite 100 795 East 94" Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 1R-23L1PB1 1R-23L1PB2 1R-23L1PB3 1F -07L1 iF-071.1-01 (5) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Harvey Finch, Baker Hughes, Wellplanner Harvey.Finch@bakerhuBhes.com ConocoPhillips ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1 R -23L1 PBI 50-029-22200-70 Baker Hughes INTEQ Definitive Survey Report 20 November, 2019 219128 31483 Baker Hughes t:� Design: lR-23L1P81 Project Kuparuk River Unit, North Slope Alaska, United States Map System: ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kupamk Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 1R Pad MD Reference: Well: 1R-23 North Reference: Wellbore: 1R-23L1PB7 Survey Calculation Method: Northing: Database: Design: lR-23L1P81 Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 7R-23 Well Position •Nl-S 0.00 usft Northing: TO (usft) 11,600.00 11,770.24 14,045.15 .El -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 1R-23LIP31 Magnetics Model Name Sample Date BGGM2018 11/112019 Design 1R-231-1 PB1 Audit Notes: Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) (usft) 5800 Well 1R-23 1 R-23 (03 88.00usft (1 R-23) 1R-23 @ 88.00usft (1R-23) True Minimum Curvature EDT 14 Alaska Production Mean Sea Level Using Well Reference Point Using geodetic scale factor 5,991,630.19usft 539,829.67usft usft Declimilion (% 16 37 Tie On Depth: 11 600.00 +N/ -S (usft) 0 00 Latitude: Longitude: Ground Level: Dip Angle 0 8088 *E/ -W Direction (usft) (`) 0.00 2000. Baler Rughea 5f 70° 23' 17.076 N 149" 40' 33.721 W 0.00 usft Field Strength (nT) 57,403 Survey Program Dab: Survey Survey From (usft) 100.00 11682.00 n Boo 20 TO (usft) 11,600.00 11,770.24 14,045.15 Survey (Wellbore) 1R-23 (1 R-23) 1R-23L1P81 MWD-INC(1R-23L1P81) 1R-23L1PB1 MWD (lR-231-1PBl) Tool Name GCT -MS MWD4NC_ONLY(INC>10-) MWD OWSG Description Schlumberger GCT multishol MWD -INC ONLY FILLER(INC>10") OWSG MWD - Standard Date 1/8/2007 10/17/2019 10/20/2019 End Date 10/20/2019 10/22/2019 Page 2 COMPASS 5000.14 Build 85H 11/20/2019 1r35:18PM Survey ConocoPhillips Mkor Hugh. 58 ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska tnc_Kuparuk Local Co-ordinate Reference: Well 1R-23 Project: Kuparuk River Unit TVD Reference: 1 R-23 @ 88.00usft (1 R-23) Site: Kuparuk 1R Pad MD Reference: 1R-23 <Q 88.00usft (1 R-23) Well: 1R-23 North Reference: True Wellbore: 1R-231_1 PB1 Survey Calculation Method: Minimum Curvature Design: lR-23L1PB1 Database: EDT 14 Alaska Production Survey 11202019 1:35: 18PM Page 3 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Azf TVD TVDSS +N/ -S +E7 -W Northing Eastin DLS Section Survey Tool Name Annotation (usft) (°) (°) (usft) (usft) (uaft) (waft) (ft) (ft) 0100') (`/100') (ft) 11,600.00 61.91 4526 6,72188 6.633.88 5,511.92 6,86829 5.997 178,07 546.667.83 0.08 7,528.60 MWD-ING_ONLY (ING10°)(2) TIP 11,682.00 6166 44.95 6,76065 6,67265 5.562.91 6,919.48 5,997,229.33 546,718.74 044 7.594.03 MWD -INC _ONLY (INC>10°)(2) KOP 11,710.85 67.60 45.00 6,773.0 6,68560 5,561.34 6,937.89 5,997,247.86 54673]86 2059. 7,61765 MWO-INC_ONLY(INC>10°)(2) Intepolated Azimuth 11740.14 81.18 45.50 6,760.87 6,692.87 5,601.15 6,95788 5,997,26777 546,756.99 46.39 7,643.10 MWD -INC _ONLY (INC>Ifl(2) Intepolated Azimuth 11,770.24 90.80 46.00 6,7a2.97 6,689.97 5,622.08 6,979.37 5,997288.81 546778.31 32M 7,670.11 MWD-INC_ONLY (INC>1(Y)(2) Intepolated Azimuth 11,800.20 91.47 47.97 6,782.37 6,694.37 5.642.51 7,001.27 5,997.37.36 546.800.10 6.94 7,696.80 MWD OWSG (3) 11,821021 9046 49.50 6,781.87 6.693.87 5,662.30 7,023.82 5,997,329.26 546,822.55 6.11 7723.11 MWD OWSG (3) 11,865.75 88.10 5163 6,782.32 6,694.32 5,684.87 7,05127 5,997,351.98 546849.87 8.99 7.753.71 MWD OWSG (3) 11696.75 89.63 54.33 6,782.93 6,694.93 5,703.53 7,076.01 5,997,370.77 546,874.51 10.01 7,779.70 MWD OWSG (3) 11,925.39 9123 56.73 6,782.71 6,694.71 5.71974 7099.62 5,997,387.10 546898.03 10.07 7.803.01 MWD OWSG (3) 11,95599 9046 59.72 6,782.26 6.694.26 5,735.85 7.12562 5,997,40335 546.923.95 10.09 7,827.04 MWD OWSG (3) 11,986.46 93.78 62.97 6,781.14 6,693.14 5,750.45 7,152.34 5.997,418.08 546.950.58 15.24 7,849.90 MWD OWSG (3) t2,01575 91.78 63.24 6,779.72 6,691.72 5,763.68 7,178.43 5997,431.45 546976.59 6.89 7,871.25 MWD OWSG(3) 12,049.95 88.% 63.20 6,779.49 6,69149 5,779.09 7,20895 5,997,44702 547.007.04 8.25 7,896.17 MWD OWSG (3) 12,060.37 90.03 6735 6,77976 6,69176 5,791.81 7,236.58 5,997,459.89 597034.59 14.03 7,91758 MWD OWSG (3) 12,111.10 89.51 68.85 6, T/9.89 6,691.89 5,803.27 7,265.09 5,997,471.50 547,063.04 5.17 7,938.10 MWD OWSG (3) 12,140.28 87.14 69.75 6,780.74 669274 5,81358 7,292.37 5,99748195 547090.26 8.69 7.957.12 MWD OWSG (3) 12,170.46 8598 68.76 6,782.55 6,694.55 5.824.25 7.320.54 5997,49277 597,118.37 505 7,976.78 MWD OWSG (3) 12200.05 86.90 66.69 6784.39 6,696.39 5,835.44 7,397.87 5.997,509.11 54],145.69 764 7,996.64 MWD OWSG (3) 12,230.19 89.66 65M 6,785.29 6,697.29 5,847.65 7,375.41 5,997,516.47 547,173.11 10.00 8.017.54 MWD OWSG (3) 12,26007 8905 63.40 6,785.63 6,697.63 5,860.55 7,402.36 5,997,529.50 547,199.99 725 8,038.87 MWD OWSG (3) 12,290.11 6760 61.74 6,786.51 6,698.51 5,874.38 7,42901 5,997,543.47 547.226.56 7.39 SOW MWD OWSG (3) 12,320.71 W). 6041 6,787.02 6,699.02 5,889.17 7,455.79 5,997,55841 547.253.25 10.31 8,084.09 MWD OWSG (3) 12,350.94 90.43 5726 6.78679 6,698.79 5,904.81 748165 5,997,574.19 547,27903 1042 8,107.59 MWD OWSG (3) 12,379.52 9028 54.51 6,78661 6.696.61 5,920.84 7,50531 5,997,59033 547,30261 9.53 8,13073 MWD OWSG (3) 12,40945 90.71 51.34 6,786.35 6,698.35 5,938.67 7,529.19 5,997,60849 547,326.39 10.79 8.155.85 MWD OWSG(3) 12,439.52 90.43 48.95 6.786.05 6,698.05 5,958.14 7,552.27 5.997,627 88 547,349.36 8.00 8.18185 MWD OWSG (3) 12,469.15 89.75 47.08 6.78601 6.698.01 5.977% 7,574.30 5,997,64782 547,371.28 6.72 8,208.00 MWD OWSG (3) 12,499.45 88.56 46.72 6,786.45 6,698.46 5,99866 7,596.42 5,997,66863 547,393.29 4.10 8,235.2 MWD OWSG (3) 12,529.65 87.33 44.31 6,78784 6,699.54 6,019.80 7,617.95 5.N7,689 89 547,414.70 6.95 8,26226 MWD OWSG (3) 11202019 1:35: 18PM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips ama agM1e,g ConocoPhillips Definitive Survey Report Company: ConowPhillips Alaska lnc_Kuparuk Project: Kupantk River Unit Site: Kuparuk 1R Pad Well: 1R-23 Wellbore: 1R-23L1PB1 Design: 1R-23L1PB1 Survey Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well 1 R-23 1 R-23 @ 88.00usft (1 R-23) 1 R-23 @ 88.00usft (1 R-23) True Minimum Curvature EDT 14 Alaska Production Annotation 11/20/2019 1:35: 18PM Page 4 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Azi TVD TVDSS +Nl-S +EJ -W Northing Easting DLS Section Survey Tool Name (usft) (°) (°) (usft) (usft) (usft) (usft) iftl (ft) (°1100) (ft) 12.55921 88.37 4159 6.78865 6,700.65 6.04142 7,638.07 5,997.711.61 54]434]1 9.85 8,289.46 MWD 0WSG(3) 12.58950 8687 38.81 6.789.91 6.701.91 6.064.61 7.65767 5.997,734.90 547,454.18 10.39 8,31795 MWD OWSG(3) 12,61966 88.03 37.31 6.791.25 6.703.25 6.088.26 7.67618 5.997,75864 547.472.56 6.30 8,346.50 MWD OWSG(3) 12,649.27 8889 34.69 6,792.04 6,704.04 6,112.20 7,693.58 5,99778268 547,489.83 9.31 8,37495 MW OWSG(3) 12,68041 90.89 32.13 6,792.10 6,704.10 6,138.19 7,710.72 5,997,808.76 597,506.83 10.43 8,405.23 MWD OWSG(3) 12,710.62 90.83 29.48 6.79165 6,703.65 6,16413 7,726.19 5,997,834.78 547.522.16 877 8,434.90 MWD OWSG(3) 12,740.89 90.25 26.39 6,791.36 6,703.36 6,190.87 7,740.37 5997,861.59 547.53620 10.39 8.464.88 MWD OWSG(3) 12,770.76 8939 2440 6,79146 6,703.46 621785 7,753.18 5,997.888.64 54],548.86 7.26 8,49461 MWD OWSG(3) 12,W5.63 90.37 20.46 6,791.53 6,703.53 8,250.08 7,765.48 5,997.920.93 54],56199 1164 8,529.M MWD OWSG(3) 12,830.71 91.14 18.27 6,791.20 6,703.20 6,273.74 7,77479 5,997,944.63 547,570.18 9.26 6554.52 MWD OWSG(3) 12,860.85 92.37 1546 6790.28 6,702.28 6,302.56 7]83.53 5.997,973.50 547,57876 10.17 8,584.60 MWD OWSG(3) 12.890.93 9501 13.13 6,788.34 6,700.34 6.331.65 7.790.94 5.998,00262 547,586.02 11.69 8,61446 MWD OWSG(3) 12,915.54 9739 1111 6,78568 6,697.68 6,355.54 7,796.21 5,998,026.53 547,591.15 11.24 8,638.71 MWD OWSG(3) 12,940.61 98.64 10.00 6,782.19 6,694.19 6,379.92 ],800.88 5,998,050.94 547,595.70 840 6663.22 MWD OWSG(3) 12,970.61 98.80 671 6,777.64 6,689.64 6,409.25 7,805.19 5,998,080.29 547.59985 10.85 8,692.26 MWD OWSG(3) 13,001.01 98.82 3.70 6,772.98 6,684.98 6,439.16 7,80791 5,999,110.21 547,602.41 9.78 8.72130 MWD OWSG(3) 13,030.58 9870 1.42 6768.48 6,680.48 6.468.35 7,80922 5,998.13941 547,603.56 763 8,749.18 MWD OWSG(3) 13.060.75 99.54 357 6,763.69 6,675.69 6,498.12 7,810.52 5,998,169.17 547,604.70 7.57 8,777.59 MWD OWSG(3) 13,090]2 99.72 5.86 6.75868 6.670.68 6,527.56 7.812.95 5.99619863 547,606.98 7.62 8,806.09 MWD OWSG(3) 13,12046 99.04 783 6.753.83 6.665.83 6,556.69 781645 5.998,22778 547,610.32 6.86 8.834 fib MWD OWSG(3) 13,151,56 98.42 1002 6,749.11 6.661.11 6,58706 7,821.22 5,998,258.16 547,614.93 7.24 8,864.82 MWD OWSG(3) 13,180.49 97.56 11.93 6,745.09 6,657.09 6,615.18 7,826.68 5,998.286.31 547620.24 7.18 8,893.12 MWD OWSG(3) 13,211.17 96.% 13.96 6,741.32 6,653.32 6,644.85 7,833.50 5,998.316.02 547.626.90 7.33 8,923.33 MWD OWSG(3) 13,240.77 9542 15.86 6,738.23 6,650.23 6,673.30 784107 5,998,344.50 547,634.32 7.$6 8,952.65 MWD OWSG(3) 13,27065 94.18 18.15 6,735.73 6,647.73 6,70177 7,649.78 5,998,37301 647,64287 8.69 8.982.39 MWD 0WSG(3) 13,30173 94.18 2022 6,73346 6,645.46 6,731.04 7859.96 5,998,402.34 547.65290 664 9,01338 MWD OWSG(3) 43,33171 94.30 2349 8.73125 6.643.25 6,758.79 7.87109 5,998,430.14 547,663.88 10.88 9,043.26 MWD 0W8G(3) 13,361.59 93.93 23.40 6729.10 6.641.10 6.786.13 788295 5.998,45754 547.675.59 1.27 9,07300 MWD OWSG(3) 13,391,60 9224 2153 6.72749 6.639.49 6,813.82 7,894.40 5,998,485.29 547,686.89 8.39 9,102.94 MWD 0WSG(3) 13,421.63 90.37 2052. 6,72660 6,638.80 684184 7905.17 5,998.513.37 54769751 708 9,132.95 MWO 0WSG(3) 13449.51 91.04 1905 6,726.46 6638.46 5866.07 7,91461 5.998.539.64 54]706.81 579 9,160.83 MWD 0WBG(3) Annotation 11/20/2019 1:35: 18PM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips a kKB ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Local Co-ordinate Reference: Well 1R-23 Project Kupamk River Unit TVD Reference: 1 R-23 @ 88.00usfl (1 R-23) Site: Kuparuk 1R Pad MD Reference: 1 R-23 @ 88.00usfl (1R-23) Well: 1R-23 North Reference: True Wellbore: 1R-23LIP81 Survey Calculation Method: Minimum Curvature Design: 1R-23LIPB7 Database: EDT 14 Alaska Production Survey Annotation 11202019 1: 35. 18PM Page 5 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Eating DLS Section Survey Too] Name (usft) (°) (% (usR) (usR (usR) (usk) (ft) () (ft) (°/100) (R) 13481.58 9049 1924. 6,726.03 6638.03 6,896.37 7,925.12 5,998,569.99 547,71716 181 9.192.90 MWD OWSG (3) 13,511.83 9056 1918 6.725.75 6.637.75 6,926.68 7.935.23 5,998,59855 547,72711 1.81 9,223.14 MWD OWSG (3) 13,541.68 89.45 19.88 6.72574 663774 6.95496 7,945.35 5.998,62668 547,73709 380 9,252.99 MWD OWSG (3) 13,571.74 89.82 20.20 6,72593 6,63793 6,983.20 7,95565 5,998,65497 54774724 163 9,283.05 MWD OVISG(3) 13,601.78 90.00 1997. 6,725.98 6,637.98 7,011.41 7,96597 5,998,68324 547,757.40 0.97 9,313.09 MWD OWSG (3) 13,63349 90.49 21.08 6,725.84 6,637.85 7.041.11 7,97709 5,998,712.99 547.768.% 383 9,344.80 MWD OWSG (3) 13,661.58 90.58 2105 6,725.58 6,637.58 7,067.32 7,987.18 5,998,739.25 547.778.31 0.34 9.372.88 MWD OWSG (3) 13,691.98 90.40 2095 6,725.32 6637.32 7,095.70 7,998.08 5,998,76769 547,789.06 0.68 9,403.28 MWD OWSG (3) 13,716.13 90.64 2168 6,725.10 6,637.10 7,118.20 8,006.85 5998,790.23 54779771 3.18 9,427.42 MWD OWSG (3) 13,745.73 89.85 22.16 6,724.98 6,636.98 7,145.66 8,017.90 5,998.817.75 547,808.62 3.12 9,45700 MWD OWSG (3) 13,77560 9009 2294 6724.99 6,636.99 7.173.24 8.029.36 5.998,84539 547,819.92 2.73 9,486.84 MWD OWSG (3) 13,806.48 90.15 22.63 6.724.93 6,636.93 7.201.71 8.041.32 5.998,873.92 547,831.73 1.02 9,517.69 MWD OWSG (3) 13,83046 90.12 22.63 6,724.87 6,636.87 7,223.85 8,05054 5,996,896.10 547.840.84 0.13 9,54164 MWD OWSG(3) 13,85062 89.91 22.89 6,724.86 6,636.86 7,25166 8,052.21 5,998.923.97 547,852.36 1.11 9,571.77 MWD OWSG (3) 13,895.64 90.09 2221 6,724.86 6,636.86 7,284.00 8,075.64 5.998.956.38 547.865.61 2.01 9,606.75 MWD OWSG (3) 13,935.56 9003 21.96 6,724.82 6,63582 7,320.99 8,090.65 5,998.993.45 547,880.42 064 9,646.65 MWD OWSG (3) 13,960.52 89.85 21.56 6,724.85 6,636.85 7,344.17 8.099.90 5,999,016.68 547,889.55 1.76 9,671.59 MWD OWSG (3) 13,985.52 89.88 21.54 6,724.91 6,636.91 7,367.42 8,109.09 5,999,039.97 547,89861 0.14 9,696.59 MWD OWSG (3) 14,015.52 89.60 21.57 6.72504 6,63TG4 7.395.33 8.120.11 5.999,06793 547,903.48 0.94 9,726.57 MWD OWSG (3) 14,045.15 89.57 20.30 6,725.26 6,637.26 7,423.00 8.13069 5.999,09566 547,919.92 4.29 9,756.20 MWD OWSG (3) 14,088.00 89.57 20.30 6,725.58 6,63758 7,463.19 8,14556 5,999,135.92 547.934.57 0.00 9,799.05 PROJECTEDIOTD Annotation 11202019 1: 35. 18PM Page 5 COMPASS 5000.14 Build 85H NOV 2 2 2019 A0GC Baker Hughes S Date: November 20, 2019 2191,28 31484 Letter of Transmittal 'To: From: Abby Bell Harvey Finch AOGCC Baker Hughes 333 West 7" Ave, Suite 100 ; 795 East 94" Avenue Anchorage, Alaska 99501 Anchorage, Alaska 99515 .Please find enclosed the directional survey data for the following well(s): 1R-23L1PB1 1R-23UPB2 1R-23L1PB3 1F -07L1 1F -07L1-01 i I (5) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Harvey Finch, Baker Hughes, Wellplanner Harvey. Finch C@bakerhuahes.com I 219128 31484 ConocoPhillips ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1R-23L1PB2 50-029-22200-71 Baker Hughes INTEQ Baker Hughes J Definitive Survey Report 20 November, 2019 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc—Kuparuk Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 1R Pad MD Reference: Well: 1 R-23 North Reference: Wellbore: 1 R-23LI PB2 Survey Calculation Method: Design: 1R-2317 PB2 Database: Project Kuparuk River Und, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) MWD -INC ONLY_FILLER(INC>70') Map Zone: Alaska Zone 04 Survey (Wellbore) Well iR-23 1 R-23 (1 R-23) Well Position +N/5 0.00 usft Northing: 11,800.20 +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 1R -23L1 P62 Magnetics Model Name Sample Date BGGM2018 11/1/2019 Design 1R-231-1 PB2 Audit Notes: Version: 10 Phase: ACTUAL Vertical Section: Depth From (TVD) (usft) 88.00 Survey Program Description Date From To MWD -INC ONLY_FILLER(INC>70') (usft) (usft) Survey (Wellbore) 100.00 11,600.00 1 R-23 (1 R-23) 11,682.00 11,770.24 1R-23L1PB7 MWD -INC (1R-23LiP81) 11,800.20 12,170.46 IR-23LiPB1 MWD (1R -231-1P81) 12,190.00 12,964.88 1R-2311 P62 MWD (1R-2311 P82) Well iR-23 1 R-23 @ 88 00usft (1 R-23) 1R-23 @ 88.00usft(1 R-23) True Minimum Curvature EDT 14 Alaska Production Mean Sea Level Using Well Reference Point Using geodetic scale factor 5,991,630.19usft 539,829.67usft usft Declination (°) 1637 Tie On Depth: 12,170.46 +NIS (usft) 0.00 +FJ -W (usft) 0.00 Latitude: Longitude: Ground Level: Dip Angle 80.88 Tool Name Description GCT -MS Schlumberger GCT multishot MWD -INC _ONLY (INC>10°) MWD -INC ONLY_FILLER(INC>70') MWD OWSG OWSG MWD - Standard MWD OWSG OWSG MWD - Standard Direction (°) 15.00 Survey Start Date 1/8!2001 10/17/2019 10/20/2019 10/23/2019 Baker Hushesg 70° 23' 17 076 N 149'40'33.721 W 0.00 usft Field Strength ren 57,403 Survey End Date 10/20/2019 10/22/2019 10/24/2019 1112012019 136 06P Page 2 COMPASS 5000. 14 Build 85H Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Local Co-ordinate Reference: Well 1 R-23 Project: Kuparuk River Unit TVD Reference: 1R-23 @ 88.00usft (1 R-23) Site: Kuparuk 1R Pad MD Reference: 1R-23 @ 88.00usft (1 R-23) Well: 1R-23 North Reference: True Wellbore: 1R-23L1P82 Survey Calculation Method: Minimum Curvature Design: 1R-23L1PB2 Database: EDT 14 Alaska Production Survey Bo H.ghesg 111202019 1:36:06PM Page 3 COMPASS 5000.14 Build 85H Map Map vertical MD Inc Azi TVD TVDSS -NIS *EI -W Northing Eastin 9 DLS Section Survey Toot Name Annotation (usft) (1) (1) (usft) (usft) (usft) (usft) (ft) (R) (°1100') (ft) 12,17046 85.98 68.76 6.782.55 6,694.55 5,824.25 7.32054 5.997,492 77 547,118.37 5.05 7,52049 MWD OWSG (31 TIP 12,190.00 W59 67.39 6.783.82 6,695.82 5.831.53 7,33863 5.997.500 15 547,136.42 7.66 7,53220 MWD OVVSG (4) KOP 12,222.12 8960 68.10 6,784.88 6,696.88 5,843.69 7,368.34 5,997,51246 547,16606 963 7,55163 MWD OWSG (4) 12,25142 9166 66.25 6,784.56 6.696.% 5,855.05 7,395.34 5,99752397 547,193.00 9.45 7,56960 MM OWSG (4) 12,280.82 92.70 64.19 6,783.44 6,695.44 5,867.36 7,42201 5,997,53642 547.219.60 784 7588.40 MWD OWSG(4) 12,311.06 91.17 60.87 6,782.42 6,694.42 5,881.30 7,44882 5,997,550.50 547.245.33 1208 7,608.80 MWD OWSG (4) 12,340.57 91.87 5823 6,781.64 6,693.64 5,896.25 7,474.25 5,997,565.59 547.27168 925 7.629,82 MWD OWSG (4) 12,370.51 91.84 55.56 6,780.67 6,692.67 5,912.59 7499.32 5,997,582.06 547296.65 8.91 7,652.09 MWD OWSG (4) 12,400.76 91.14 52.63 6,779.88 6,691.88 5,930.33 7,523.81 5,997.599.92 547,32105 9% 7,675.56 MWD OWSG (4) 12,430.77 91.32 49.73 6.77924 6,69124 5.949.13 7.547.18 5,997.618.85 547,344.32 9.68 7,699.77 MWD OWSG (4) 12,460.38 93.47 47.77 6,778.00 6.690.00 5,968.64 7,56942 5.997,63847 547,366.45 9.82 7,724.37 MWD OWSG (4) 12,49040 9279 43.91 6,776.36 6688.36 5,989.51 7,590.92 5.997,65946 547,38TU 13.04 7,750.10 MWD OWSG (4) 12,520.80 93.78 40.41 6,77462 6,686.62 601201 7,611.29 5,997,68206 547406.08 11.95 7,777.10 MWD OWSG (4) 12,55040 9359 4105 6,77272 6,689.72 6,034.39 7,630.56 5,997.704.54 547.427.24 2.25 7,80371 MWD OWSG (4) 12,580.81 9344 44.27 6,770.85 6,682.85 6,05671 7,651.13 5,997.726 97 54744768 10.58 7,830.59 MWD OWSG (4) 12,605.99 9209 46.45 6,76964 6,68164 6,07438 7.669.02 5,997,744.73 547,465.48 10.17 7.85229 MWD OWSG J4) 12,636.05 92.86 49.13 6,768.34 6,680.34 6.094.56 7,691.26 5.997,765.02 547,48761 9.27 7,877.53 MWD OWSG (4) 12,666.19 9154 48.53 6.767.18 6.679.18 6114.38 7,713.93 5.99778497 597,510.17 4.81 7,902.55 MWD OWSG (4) 12,69627 9169 45.36 6766.33 6678.33 6,134.91 7.73590 5.997,80561 547,532.03 10.55 7,92806 MWD OWSG (4) 12.726.00 9187 41.88 6,765.41 6677.41 6,1%.41 7,756.40 5,997,82722 547552.41 11.72 7,954.14 MWD OWSG (4) 12,760.03 93.26 3864 6,763.89 6,675.89 6,182.35 7,778.37 5,997,853.28 547,574.24 10.35 7,984.88 MWD OWSG(4) 12.790.11 9350 36.51 6,762.11 667411 6,206.15 7,7%97 5,997,877.17 547.59242 7.11 8,01261 MWD OWSG (4) 12,818.96 94.05 33.87 6,76021 6,672.21 6.229.67 7,81327 5,997.900.78 547,608.88 9.33 8,03963 MWD OWSG (4) 12,85118 94.89 31.45 6.757,70 6.66970 6,256.72 7,83060 5,997.927.91 547,626.07 7.93 8,07023 MWD OWSG (4) 12,88042 9566 28.22 6,755.01 6,667.01 6,281.97 7,84508 5,997,95323 547,640.41 11.31 8,098.37 MWD OWSG (4) 12,909.94 95.84 2547 6,752.05 6,664.05 6,308.17 7,858.34 5,997,979.51 547,653.54 9.29 8,127.12 MWO OWSG (4) 12,935.61 96.00 23.13 6.749.41 6.661.41 6.331.44 7968.85 5.998,002 83 W.663.92 9.09 8,152.31 MWD OWSG (4) 12,964.86 96.30 20.52 6746.27 6.658.27 6.358.45 7,879.67 5.998,029.90 547.674.59 8.92 8,181.20 MWD OWSG (4) 13,010.00 9630 20.52 6,741.32 6,653.32 6,400.46 7,895.39 5,998,071.98 547,69009 0.00 8,225.84 PROJECTED NTD Bo H.ghesg 111202019 1:36:06PM Page 3 COMPASS 5000.14 Build 85H To Nov 2 2 2019 AOGCC Baker Hughes S Date: Abby Bell AOGCC 333 West 7th Ave, Suite 10 Anchorage, Alaska 99501 219128 31485 Letter of Transmittal November 20, 2019 From. Harvey Finch Baker Hughes 0 795 East 94th Avenue Anchorage, Alaska 99515 ;Please find enclosed the directional survey data for the following well(s): 1R-23L1PB1 IR-23L1PB2 1R-23L1PB3 1F -07L1 1F -07L1-01 i (5) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Harvey Finch, Baker Hughes, Wellplanner Harvey.Finch@bakerhughes.com i 219128 31485 ConocoPhillips ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1 R -23L1 PB3 50-029-22200-72 Baker Hughes INTEQ Baker Hughes�j Definitive Survey Report 20 November, 2019 ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc—Kuparuk Local Co-ordinate Reference: Project: Kuparuk River Unit TVD Reference: Site: Kuparuk 1R Pad MD Reference: Well: 1 R-23 North Reference: Wellbore: 1 R -23L1 PB3 Survey Calculation Method: Design: 1R -231-1P83 Database: Project Kuparuk River Una, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Geo Datum: NAD 1927 (NADCON CONUS) MWD4NC_ONLY_FILLER(INC>113') Map Zone: Alaska Zone 04 Survey (Wellbore) Well 1 R-23 1 R-23 (1 R-23) Well Position -NI-S 0.00 usft Northing: 11,800.20 +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 us% Wellhead Elevation: Wellbore 1R -23L1 PB3 Magnetics Model Name Sample Date BGGM2018 11/1/2019 Design 1R-23L1PB3 Audit Notes: Version: 1.0 Phase: ACTUAL Vertical Section: Depth From (TVD) lush) 8800 Survey Program Description Date From To MWD4NC_ONLY_FILLER(INC>113') (usft) (waft) Survey (Wellbore) 100.00 11 600.00 1 R-23 (1 R-23) 11,682.00 11,770.24 1R-23L1PB1 MWD -INC (1R-23L1PB1) 11,800.20 12,111.10 1R-23L1PB1 MWD (1R-23L1PB1) 12.130.00 13,720 47 1 R -23L1 PB3 (1 R -23L1 PB3) Well 1 R-23 1 R-23 @ 88.00usft (1 R-23) 1R-23 @ 88.00usft (1R-23) True Minimum Curvature EDT 14 Alaska Production Mean Sea Level Using Well Reference Point Using geodetic scale factor 5,991,630.19usft Latitude: 539,829.67usft Longitude: usft Ground Level: Declination Dip Angle (1) (1) 16.37 80.88 Tie On Depth: 12,111.10 +N/ -S +FJ -W (usft) (usft) 0.00 0.00 Tool Name Description GCT -MS Schlumberger GCT multishot MWD-INC_ONLY(INC>l0") MWD4NC_ONLY_FILLER(INC>113') MWD OWSG OWSG MWD - Standard MWD OWSG OWSG MWD - Standard eekerrwghe:g 70" 23' 17.076 N 149'40'33.721 W 0.00 usft Field Strength (nT) 57,403 Direction (1 15.00 Survey Survey Start Date End Date 1/8/2001 10/17/2019 10/2012019 10/20/2019 10/22/2019 10/25/2019 10/28/2019 11202019 1:36.52PM Page 2 COMPASS 5000 14 Build 85H Survey ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska lnc_Kuparuk Local Co-ordinate Reference: Well 1R-23 Project: Kuparuk River Unit TVD Reference: 1R-23 @ 88.00usR (1R-23) Site: Kuparuk 1 R Pad MD Reference: 1R-23 @ 88.00usR (1R-23) Well: 1R-23 North Reference: True Wellbore: 1R-23L1PB3 Survey Calculation Method: Minimum Curvature Design: 1R-23L1PB3 Database: EDT 14 Alaska Production Survey Annotation TIP KOP Baker Hughes S 11202019 1:36:52PM Page 3 COMPASS 5000. 14 Build 85H Map Map Vertical MD Inc Azi TVD TVDSS -N/-S +E/ -W Northing Easting DLS Section (7 (1) (usft) (usft) usft) lust) (-/100') Survey Tool Name (usft) (R) (ft) IRI 12,111.10 8951 68.85 6,77989 6,69189 5.80327 7,265.09 5997,47150 547,063.04 5.17 7,485.87 MWD OWSG (3) 12,130,00 87.97 69.43 6.780,30 6,692.30 5,810.00 7,282.75 5997,47832 547,080.65 871 7,496.94 MWD OWSG (4) 12,160.56 86.65 66.49 6,781.74 6,693.74 5,821.45 7,31104 5,997,48992 547,108.88 10.54 7,515.33 MWD OWSG (4) 12,190.20 84.77 6374 6,783.95 6,695.95 6,833.89 7,33785 5,997,502.50 547.135.62 1122 7,534.28 MWD OWSG(4) 12,22161 86W 62.80 6,786.30 6,69830 5,84797 7,365.82 5.997,51674 547,163.52 677 7,555.12 MWD OWSG (4) 12,251.37 82.21 6244 6.789.18 6,701.18 5,861.59 7,392.12 5,997.53049 547,189.74 15.07 7,57508 MWD OWSG (4) 12,280.32 8244 69.19 6,793.04 6,705.04 5,874.48 7,41775 5,997,543.51 547.21530 6.04 7,594.16 MWD OWSG (4) 12,312.64 8323 69.42 6.797.10 6,709.10 5,887.18 7,447.40 5.997,55637 547,244.88 16.14 7,614.11 MWD OWSG (4) 12,34224 83.01 66.97 6,800.62 6,712.62 5,898.02 7,474.50 5,997,567.36 547,271.91 6.31 7,631.59 MWD OWSG (4) 12,37166 9074 68.34 6,802.23 6.714.23 5.909.18 7.501.65 5,997,57866 547,299.00 26.68 2649,40 MWD OWSG (4) 12.403.09 9107 66.09 680173 6,713.73 5.921.35 7,530.62 5,997,590.98 547,32291 723 7668.65 MWD OWSG(4) 12.431.88 87.73 63.20 6,802.03 6,714.03 5,933.67 7,556.63 5,997.60344 547,353.85 1534 7,687.29 MWD OWSG (4) 12,461.92 86.31 60.99 6,803.59 6,71559 5,94271 7,583.13 5.997.61762 547,380.28 8.74 7,707.71 MWO OWSG (4) 12,49128 87.57 60.64 6,805.16 6,717.16 5,962.01 7,60873 5.997,632.05 547.405.79 445 7,728.14 MWD OWSG (4) 12,521.23 8963 58.98 6,805.89 6,717.89 5,977.06 7,634.61 5,997,647.24 547.431.59 8.83 7,749.38 MWD OWSG (4) 12,551.84 91.13 5765 6,805.69 6,717.69 5,993.14 7,660.65 5,997,663.46 542457.54 6.55 7,771.65 MWD OWSG (4) 12,580.06 92.24 5509 6,804.86 6,716.86 6,OW,76 7,684.14 5,997,679.20 547,480.94 9.88 7,792.82 MWD OWSG (4) 12,610.33 9,195 53.17 6.802.96 6.714.96 6.026.46 7706.62 5.997,69203 547505.32 10.96 7,816.25 MWD OWSG(4) 12,640.30 9838 53.17 6,799.48 6,711.48 8,044.30 7,73244 5.997,71499 547,529.05 11.44 7,839.65 MWD OWSG (4) 1267038 102.82 53.18 6,793.95 6,705.95 6,06202 7,756.10 5,997,732.83 547.552.61 14.76 7,86288 MWD OWSG (4) 12,700.90 10.40 51.83 6,78625 6,698.25 6,079.99 7,779.53 5,997,750.93 547,57599 12.49 7,886.31 MWD OWSG (4) 12,730.88 106.96 4966 6,77765 6,68965 6,098.16 7,80177 5,997,76921 547.598.08 7.18 7,909.61 MWD OWSG (4) 12,761.14 106.83 4759 6,768.85 6,680.85 6,117.29 7.82349 5,997,78846 54261970 6.56 7,933.72 MWD OWSG (4) 12,79123 10560 45.84 6,760.45 6,672.45 6,137.10 7,844.52 5,997,808.38 547,640.63 692 7958.30 MWD OWSG (4) 12.821.24 10395 94.54 6,752.80 6,664.80 6.157.55 7,665.11 5,997,82894 547,661.10 6.91 7.983.38 MWD OWSG (4) 12,850.% 101.72 44.07 6,746.28 6,658.28 6,178.01 7,085.07 5,997,849.50 547,680.95 7.76 8,008.31 MWD OWSG (4) 12,88020 99.87 43.03 6,74073 6,652.73 6.199.11 7,905.13 5.997,87071 547,700.90 7.13 8,033.88 MWD OWSG (4) 1291105 97.88 42.52 6,735.97 6,647.97 6,221.49 7,92583 5,997,893.19 547,72147 6.65 8,060.85 MWD OWSG (4) 12,940.80 96.31 39.89 6,732.30 6,644.30 6,243.70 7,94527 5,997,915.50 547,740.60 10.24 8,087.33 MWD OWSG (4) 12.971.03 96.07 38.M 6,729.04 6,64104 6,267.01 7964.23 5,997,938.91 597,759.63 5.16 8,114.76 MWD OWSG (4) Annotation TIP KOP Baker Hughes S 11202019 1:36:52PM Page 3 COMPASS 5000. 14 Build 85H ConocoPhillips Bake Hughe g ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Local Co-ordinate Reference: Well 1R-23 Project Kuparuk River Unit TVD Reference: 1R-23 @ 88.00usft (1R-23) Site: Kuparuk 1R Pad MD Reference: iR-23 @ 88.00usft (1R-23) Well: iR-23 North Reference: True Wellbore: iR-2311 PB3 Survey Calculation Method: Minimum Curvature Design: IR-23LiPB3 Database: EDT 14 Alaska Production Survey Annotation 11202019 1: 36'52PM Page 4 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Am TVD TVDSS +N/ -S +E/ -W Northing Eastin g DLS Section (usft) (") (o) (usft) (usft) (usft) (usft) (o/100') Survey Tool Name (ft) (ft) (ft) 13,000.94 96.10 3535 6,725.87 6,637.87 6,290.81 7,982.07 5,997,962.81 54777734 9.94 8,142.37 MWO OWSG (4) 13031.03 96.13 33.72 6,722.66 6.634.66 6.315.46 7.999.03 5,997,98754 547794.16 5.39 8,170.56 MWD OWSG(4) 13,06094 95.97 30.95 6.719.51 6631.51 6.340.59 8.014.93 5,998,012 75 547,80994 9.23 8,198.95 MWD OWSG (4) 13,091.02 95.69 2835 6,716.45 6,628.45 6,366.59 8,02974 5,998,038.83 547,824.60 865 8,22790 MWD OWSG (4) 13,120.94 95.69 25.71 6,71349 662549 6,393.11 8.04327 5,998,065.42 547,837.98 8.78 8,25702 MWD OWSG (4) 13,150.58 95.23 23.25 6710.66 6,622.66 6,419.96 8,05549 5,998,092.33 547.850.06 841 8,286.12 MWD OWSG (4) 13,180.61 94.89 21.16 6,70802 6,620.02 6.44765 8,066.79 5,998,12008 547.861.22 702 8,315.79 MM OWSG (4) 13,210.76 94.06 18.20 6.705.65 6.61766 6,475.95 8,07692 5,998148.43 547,871.19 10.17 8,345.75 MWD OWSG (4) 13,24067 94.43 16.04 6,703.45 6,61545 6,504.45 8,08570 5,998 176.98 597879.82 7.31 8,375.55 MWD OWSG (4) 13,270.76 93.75 15.11 6,701.30 6,613.30 6,533.37 8,093.75 5,998,205.93 547,88772 3.82 8,405.56 MWD OWSG (4) 13.30066 91,60 1209. 6,699.91 6611.91 6,562.39 8.100.78 5.998,234.99 547,894.59 12.39 8.435.42 MWD OWSG(4) 13,330.76 8975 985 6.699.55 6.611.55 6,59194 8.106.50 5,998,264.56 547,900.15 965 8,465.44 MWD OWSG (4) 13.360.76 88.16 7.68 6,700.10 6612.10 6,621.58 8,111.07 5,998,294.22 547,904.57 8.97 8,495.25 MWD OWSG (4) 13,390.78 88.10 543 6,701.08 6,613.08 6,651.38 8,114.50 5,998,324.04 547,907.83 749 8,524.93 MWD OWSG (4) 13,42100 69.00 2.20 6,701,84 6.613.84 6,681.52 8,116.51 5.998,354 19 547903.66 11.09 8,554.56 MWD OWSG (4) 13,455.63 8978 0.16 6,702.21 6,614.21 6,716.14 8,117.22 5,998,38881 547.910.21 6.31 8,586.19 MWD OWSG (4) 13,48061 89.11 359.23 6,702,45 6,61445 6,741.12 8.117.09 5,90,413]8 597909.94 4.59 8,612.28 MWD OWSG (4) 13,51065 88.37 35828 6,703.12 6,615.12 6,771.14 8,116.43 5,998,443.80 547,909.13 401 8,641.11 MWD OWSG (4) 13,54060 85.79 357.06 6.70464 6,616.64 6601.03 8.115.22 599847367 547907.76 9.53 8,669.66 MWD OWSG (4) 13,570.70 83.32 356.94 6.707.50 6.619.50 6.830.95 8,113.65 5,998,503.58 547,90.03 8.22 8,698.16 MWD OWSG (4) 13,60o38 81.58 355.90 6,71140 6623.40 6,860.31 8.111.81 5996532.93 547,904.04 6.81 8,726.04 MWD OWSG (4) 13,630.68 81.0 35227 6.71597 6,627.97 6,890.10 8,10873 5.9%,W2 70 547,900.79 11,96 8,754.02 MWD OWSG (4) 13,660.47 80.81 350.58 6,720.65 6632.65 6,919.19 8,104.34 5.996591 77 547,80.25 5.68 8,780.98 MWD OWSG (4) 13,69047 60.61 351,85 6,725.50 6,63750 6,948.45 8,09982 5,90,621.00 547.891.57 4.23 8,808.07 MWD OWSG (4) 13,720.47 82.26 35354 6,729.97 6,641.97 6,977.87 8,06.05 5,90 ,650.40 547,887.65 7.83 ,835.52 MWD OWSG (4) 13,760.0 82.26 353.54 6,735.29 6,647.29 7,01679 8,091.64 5998,68929 547,883.03 0.00 8,871.97 PROJECTED to TO Annotation 11202019 1: 36'52PM Page 4 COMPASS 5000.14 Build 85H THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY James Ohlinger Staff CTD Engineer ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510 Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1R -23L1 Permit to Drill Number: 219-128 Sundry Number: 319-489 Dear Mr. Ohlinger: Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 w .aogcc.alaska.gov Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. SincerelyI& . Price Chair DATED this I day of November, 2019. 3BDMS14�NOV 9 5 2019 RECEIVE® STATE OF ALASKA OCT 2 9 2019 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGCC 9n AAC os oan 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ Operations shutdown ❑D Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool- ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: _Whipstock_❑ 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: ConocoPhillips Alaska Inc Exploratory ❑ Development Q. Stratigraphic ❑ Service ❑ 219-128 - 3. Address: 6. API Number: PO Box 100360, Anchorage AK 99510 50-029-22200-60 ^.-c 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A KRU 11R-231-1 Will planned perforations require a spacing exception? Yes ❑ No ❑� 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL 25627, ALK 2560 1 Kuparuk River Field / Kuparuk Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MO (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 12180' - 7004' 12178' 7003' 2841 NIA N/A Casing Length Size MD TVD Burst Collapse Conductor 79' 16" 123' 123' Surface 6289' 9-5/8" 6331' 4072' Production 12149' 7" 12178' 7003' Perforation Depth MD (ft): Perforation Depth TVD (ft): ITubing Size: 3-1/2" Tubing Grade:Tubing J-55 711610' MD (ft): 11710'-11770' 6774'-6803' Packers and SSSV Type: Baker HB Retrievable Packer Packers and SSSV MD (ft) and TVD (ft): 11581' MD / 6713' TVD 12. Attachments: Proposal Summary �Wellbore schematic 0 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑A • Service ❑ 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: N/A (Operations Shutdown) IL ❑ WINJ ❑ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: 10/29/2019 Commission Representative: Victoria Loepp GINJ ❑ Op Shutdown Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: James Ohlinger Contact Name: Ryan McLaughli Authorized Title: Staff CTD Engin Contact Email: an.MO1au hlin Co .COM Contact Phone: 265-6218 Authorized Signature - Date: 9 COMMISSION USE ONLY Conditions of approval: Notify Commission a representative may witness Sundry Number: ,soJthat Plug Integrity ❑ BOP Test LJ Mechanical Integrity Test ❑ Location Clearance ❑ Other:75OF f-ls f- �s6o� 5 -3BDMS -�NOV 0 5 2019 lin rt v/a���<revit-r frsf �1 Z��P`X`5 wcll o�cnzfro ns and 5\ �V brV 1 1/ �uY�+-1 m Q r1J� Of zr7 Post Initial Injection MIT Req'd? Yes ❑ No ��,/ % flq:5 � C( *te 06"--f t4) f 0+1 fiC 2-5-IDJ Spacing Exception Required? Yes o LTJ Subsequent Form Required: /0 — 4 b 4 y1 Approved by: COMMAPPROVED BY ISSIONER •, ��� THE COMMISSION Date: ' ' `� v , ` h I t \ A L uS�Form and F 10-403 evil d 4/2017 Approved application is valid for 12 months from e d of approval. Attachments in Duplicate KRU 1R-23 CTD Summary for Sundry (Operations Shutdown) Summary of Operations: On October 16th CDR3-AC rigged up on KRU well 1 R-23 (191-101) to drill tri -lateral CTD project. After 3 unsuccessful attempts at drilling the 1 R-231-1 lateral (219-128), primarily due to hole cleaning issues in the 7" production casing, the decision was made to rig down CDR3-AC from 1 R-23 and set the well up for a cement pilot hole exit for the rig to come back at a later date and complete the scope of the project under the approved PTD In preparation for resuming CTD operations on this well, perforations will be shot in the tubing tail, cement will be pumped to occupy the 7" casing and plug off C -sand perforations, and the XN nipple in the tubing tail will be milled out. A subsequent application for Sundry Approvals will be submitted for the wellwork plans laid out. CDR3-AC will plan to return in December 2019 to mill a cement pilot hole, set a 3-1/2" whipstock, mill a 2.80" window in the production casing at a depth of 11,662' MD, and drill the rest of the tri -lateral project to the original scope. Page 1 of 1 10/29/2019 McLaughlin, R an From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Tuesday, October 29, 2019 10:18 AM To: McLaughlin, Ryan Cc: Ohlinger, James J Subject: [EXTERNAL]KRU 1 R-231_1 (PTO 219-128) Operations Shutdown Request Ryan, Verbal approval is granted for the Operations Shutdown for CRD3-AC for KRU IR-23L1(PTD 219-128). Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria LoePg@alaska goy CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding if, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907) 793-1247 or Victoria LOenD@alaska aov From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Sent: Tuesday, October 29, 2019 10:13 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Cc: Ohlinger, James J <James.J.Ohlinger@conocophillips.com> Subject: 1R-23 (PTD 191-101) Operations Shutdown Request Hello Victoria On October 16th CDR3-AC rigged up to drill a tri -lateral project on 1R-23. After 3 unsuccessful attempts at drilling the 1R-231_1 lateral, primarily due to hole cleaning issues in the 7" production casing, the decision was made to rig down CDR3-AC from 1R-23 and set the well up for a cement pilot hole exit for the rig to come back at a later date and complete the scope of the project under the approved PTD. In preparation for resuming CTD operations on this well, perforations will be shot in the tubing tail, cement will be pumped to occupy the 7" casing and plug off C -sand perforations, and the XN nipple in the tubing tail will be milled out. CDR3-AC will mill a cement pilot hole, set a 3-1/2" whipstock, and mill a 2.80" window in the production casing at a depth of 11,662' MD and complete the original scope of the project under the existing permits . i We are requesting verbal approval for an Operations Shutdown with the Sundry to ne submitted today. We will also ment-squeezing the c -sand perforations and setting a new whipstock prior to submit a subsequent sundry request for ce beginning the service coil work. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 Time Log & Summary Report AOGCC 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/16/2019 Rig Release Time Log StartTme EndT.. our (no Shin Depth rIKS) End Depth (We) Phase Op Code AefivMCode Tune P -T-X Operation 10/15/2019 10/15/2019 1.00 0.0 0.0 MIRU MOVE CTOP P Install pull plate, PJSM, perform damaged coil 12:00 13:00 procedure with rig CTC, repeat with BOT external CTC, trim 2 7' section of Coil for testing, prep Coil for shipment. 10/15/2019 10/15/2019 4.00 0.0 0.0 MIRU MOVE CTOP P Begin decomission of reel (#53723/16600), 13:00 17:00 install grapple into Coil, remove inner reel iron and bulkhead, remove wash pipe, remove horses head Counter, pin back INJH counter. 10/15/2019 10/15/2019 1.00 0.0 0.0 MIRU MOVE CTOP P Unstab coiled tubing from INJH, secure Coil to 17:00 18:00 spool, remove saddle clamps, reel in hanging 10/15/2019 10/15/2019 1.50 0.0 0.0 MIRU MOVE CTOP P Prep to remove reel from rig, remove bombay 18:00 19:30 door dike, remove king pin, bombay doors, open doors 10/15/2019 10/15/2019 1.00 0.0 0.0 MIRU MOVE CTOP P Trucks on location, PJSM, Load out reel, secure 19:30 20:30 onto truck. 10/15/2019 10/15/2019 1.00 0.0 0.0 MIRU MOVE CTOP P Move in and spot reel for pick. load reel into rig. 2030 21:30 10/15/2019 10/15/2019 1.00 0.0 0.0 MIRU MOVE CTOP P Remove side door stripper from INJH, cleanout 21:30 22:30 1 sump and inspect 10/15/2019 10/16/2019 1.50 0.0 0.0 MIRU MOVE CTOP P Set reel in saddles, shim reel hubs, Install 22:30 10000 1 saddle clamps. Prep reel for stabbing 10/16/2019 10/16/2019 6.00 0.0 0.0 MIRU MOVE CTOP P Stab CT into injector, Make up CTC, M/U Inner 00:00 06:00 reel iron, M/U pressure bulkhead, Nipple down ROPE, RID cellar 10/16/2019 10/16/2019 6.00 0.0 0.0 MIRU MOVE RURD P Complete RD, Peak trucks arrive, PJSM, hook 06:00 12:00 up to sows & pull off well, jeep up modules 10/16/2019 10/16/2019 4.50 0.0 0.0 MIRU MOVE MOB P Move from 1A-Pad to 1R-Pad 12:00 1630 10/1612019 10/16/2019 2.30 0.0 0.0 MIRU MOVE MOB P Spots sub & pits over 1 R-23, lay mats 16:30 1848 10/16/2019 10/16/2019 1.50 0.0 0.0 MIRU MOVE RURD P Begin RU checklist, drops stairs, secure 18:48 20:18 landings, move shop & 1/2-Way house to 1 R- Pad & spot up 10/16/2019 10/16/2019 2.20 0.0 0.0 WHDBOP NUND P Continue RU checklist, NU BOPE, MU MP line 2018 22:30 FRU to tango valves " Rig Accepted: 10/16 Q 22:30 hm 10/16/2019 10/17/2019 1.50 0.0 0.0 MIRU WHDBOP RURD P Continue RU checklist, MU PUTZ, MU tiger-tank 2230 00:00 hardline, begin greasing all valves post N2 blow- down, grease tree valves, swabs, & tango valves 10/17/2019 10/17/2019 0.80 0.0 0.0 MIRU WHDBOP RURD P Complete RU, Complete greasing valves, 00:00 00:48 1 Complete prep for BOP tests 10/17/2019 10/17/2019 0.70 0.0 0.0 MIRU WHDBOP PRTS P PJSM, fluid pack lines, cycle & bleed off drilling 00:48 01:30 choke, perform shell test 10/17/2019 10/17/2019 7.00 0.0 0.0 MIRU WHDBOP BOPE P Perform intial ROPE test (250 psi low / 3500 psi 01:30 08:30 high) Fail Pass on R7 " Witnessed by Lou Laubenstein of the AOGCC 10/17/2019 10/17/2019 2.00 0.0 0.0 MIRU WHDBOP BOPE P Fill Coil test inner reel iron, pressure bulkhead, 08:30 10:30 1 and stripper 10/17/2019 10/17/2019 1.00 0.0 0.0 PROD1 WHPST PRTS P Pressure test PDL's and TT line 10:30 11:30 1 10/17/2019 10/17/2019 1.00 0.0 0.0 PROD1 WHPST RGRP P Replace bales on top drive 11:30 12:30 10/17/2019 10/17/2019 1.80 0.0 76.9 PRODt WHPST PULD P PJSM.M/U BHA#1 with 1° WFT fixed bend 12:30 1418 motor, 2.74" String reamer, and 2.74" diamond window mill. PD BHA#1 10/17/2019 10/17/2019 2.10 76.9 11,120.0 PROW WHPST TRIP P RIH, EDC open, Pumping seawater 1418 16:24 10/17/2019 10/17/2019 0.20 11,120.0 11,515.0 PROD? WHPST DLOG P Log K1 for+182', (new Coil), Inspect counter, 1624 16:36 PUW=39K Page 1/14 Report Printed: 10/2912019 Time Log & Summary Report AOGCC 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 1 0/1 61201 9 Rig Release: Time Log start Time End Trite Dw rv) sten Depth (ftKB) End Depth (fiKB) Phese Op Code AeW Cade Time P -FXrpsi Ope.tbn 10/17/2019 10/17/2019 1.30 11,515.0 11,680.9 PROW WHPST DISP P in well, tag nipple at 11,598', pickup, 1636 17:54 C, bring on pumps, get right through, to milling fluid, dry tag TOWS at ' 10/17/2019 10/17/2019 2.10 11,680.9 11,682.4 PROD1 WHPST WPST P umping at 11,680.9', FS = 709 psi @ 1.9 1754 20:00 T = 14.3K, WOB = -0.7K, annular = (11.8 ppg at window), WHP = 145 psi, 4791 psil.9 bpm in, 1.82 bpm out, vibrations climb to 3's 10/17/2019 10/18/2019 4.00 11,682.4 11,685.2 PROD1 WHPST WPST P Milling @ 11,682.4', CWT = 13.3K, WOB = 1.4K, 20:00 0000 annular = 4117 psi, WHP = 148 psi, pump - 4850 psi, vibrations to 3's 10/18/2019 10/18/2019 0.50 11,685.2 11,685.8 PROD1 WHPST WPST P Milling @ 11,685.2', CWT= 13.9K, WOB=0.3K, 00:00 00:30 annular =4120 psi, WHP= 151 psi, pump= 4786 psi TOWS = 11,681', BOW = 11,684.5' Pre -load DS PDL with build/tum tools 10/18/2019 10/18/2019 3.00 11,685.8 11,710.0 PROD1 WHPST WPST P String reamer out, begin pushing on it, PUW = 00:30 03:30 35K at 11,707' (PU to adjust TF), mill rat -hole to 11,710% PUW = 36K 10/18/2019 10/18/2019 1.30 11,710.0 11,710.0 PROD? WHPST REAM P Perform reaming passes 5R, 35R, 335R, & 03:30 04:48 185R, dry drift up & down, clean 10/18/2019 10/18/2019 1.00 11,710.0 11,710.0 PROW WHPST REAM P Perform additional reaming passes to ensure 04:48 05:48 ultra smooth window, Confirm TD @ 11710 after dry drift 10/18/2019 10/18/2019 2.00 11,710.0 55.0 PRODi WHPST TRIP P Trip out of hole, Open EDC @ 11610' 05:48 07:48 10/18/2019 10/18/2019 0.80 55.0 0.0 PROD1 WHPST PULD P Tag up, Space out, PUD BHA#1. Mills out @ 0748 08:36 2.74 Go, 2.73 No Go 10/18/2019 10/18/2019 1.00 0.0 62.6 PROD1 DRILL PULD P Reconfig BHA, Not running USR, PD BHA#2 0836 09:36 with 2.5° AKO motor and RB Hughes bi center. Make up to Coil and surface test. Check pack offs. 10/18/2019 10/18/2019 2.20 62.6 11,080.0 PROD1 DRILL TRIP P Trip in hole, BHA #2 0936 11:48 10/18/2019 10/18/2019 0.10 11,080.0 11,133.0 PROD1 DRILL DLOG P Lag K1 for+21.5', Close EDC 11:48 11:54 10/16/2019 10/18/2019 0.20 11,133.0 11,710.0 PROD1 DRILL TRIP P Continue in well, Wt chk @ 11635 36K, Clean 11:54 12:06 pass through window 10/18/2019 10/18/2019 1.10 11,710.0 11,755.0 PROD1 DRILL DRLG P 11710', Drill, 1.91 BPM @ 4400 PSI FS, 1206 13:12 BHP=4155, Drill to EOB @ 11755' Near bit INC 1@88' 10/18/2019 10/18/2019 0.20 11,755.0 11,100.0 PROD1 DRILL TRIP P End of build PUH totie into Kt 13:12 13:24 10/18/2019 10/18/2019 0.20 11,100.0 11,132.0 PROW DRILL DLOG P Log K1 for+1 foot. 13:24 13:36 10/18/2019 10/18/2019 0.10 11,132.0 11,700.0 PROD1 DRILL TRIP P RBIH to log RA marker 13:36 13:42 10/18/2019 10/18/2019 0.10 11,700.0 11,724.0 PRODi DRILL DLOG P Log RA @ 11,689', TOWS @ 11682, TOW @ 13:42 13:48 11,685, BOW @ 11,688 10/18/2019 10/18/2019 2.10 11,724.0 65.1 PROW DRILL TRIP P Pull up through window, Open EDC, POOH 13:48 1554 10/18/2019 10/18/2019 1.00 65.1 0.0 PROW DRILL PULD P At surface, PJSM, Tag up space out. PUD BHA 15:54 16:54 #2 build section BHA 10/18/2019 10/18/2019 1.10 0.0 78.0 PRODt DRILL PULD -15- PD BHA#3 Drilling Assembly (NOV Agitator, 0.5° 16:54 18:00 AKO motor, new Baker Dyna -Pilot bit), slide in cart, check pack -offs, MU to coil, tag up, set counters 10/18/2019 10/18/2019 1.00 78.0 11,100.0 PROD1 DRILL TRIP P RIH w/BHA #3 18:00 19:00 Page 2114 ReportPrinted: 10/29/2019 Time Log & Summary Report AOGCC 1 R-23 . Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/16/2019 Rig Release Time Log Steri Time End Time our into Stan Depth (RKB) End Depth (MB) Phase 00 cotle ActAy Code Tune P -T-X OPeratwn 10/18/2019 10/18/2019 0.20 11,100.0 11,152.0 PROD1 DRILL DLOG P log Kt for+16' correction 19:00 19:12 10/18/2019 10/18/2019 1.50 11,152.0 11,680.0 PROD? DRILL TRIP P Continue RIH, PUW = 36K @ window, 19:12 2042 Stack weight at window @ 10 fpm @ DTF (-11,685'), PU & spin bit, RIH at 15 fpm, no good (-11,688'), PU spin bit, pumps off, RIH @ 30 fpm, stack at -11,686', PUW = 36K, oreint TF 15° ROHS @ 30 fpm, stack at -11,688', orient TF 10° ROHS @ 20 fpm no-good 10/18/2019 10/18/2019 0.80 11,680.0 11,680.0 PROD1 DRILL CIRC T Confer with town, work plan forward (no 2.74" crayola mills on slope), decison made to POOH 20:42 21:30 for 0.5° AKO motor, 2.74" string reamer & 2.74" DSM 10/18/2019 10/18/2019 2.00 11,680.0 78.0 PROD1 DRILL TRIP T POOH, tag up, PJSM 21:30 23:30 10/18/2019 10/19/2019 0.50 78.0 78.0 PRODI DRILL PULD T Begin PUD BHA #3 23:30 00:00 10/19/2019 10/19/2019 0.70 78.0 0.0 PROD1 DRILL PULD T Complete PUD BHA#3, considerable marking on motor, marks are LS below wear -band & HIS 0000 0042 above wear -band, possible binding up in window with motor 10/19/2019 10/19/2019 1.00 0.0 63.0 PROD1 DRILL PULD T PD BHA #4 Window Dressing Assembly (0.5° 0042 0142 AKO motor, 2.74" string reamer, & 2.74" DSM), slide in cart, check pack -offs, MU to coil, tag up, set counters 10/19/2019 10/19/2019 2.00 63.0 11,075.0 PROW DRILL TRIP T RIH w/ BHA #5 Window Dressing Assembly 01:42 03:42 10/19/2019 10/19/2019 0.20 11,075.0 11,137.0 PROD1 DRILL DLOG T Log K1 for +1 3.5'correction 03:42 03:54 10/19/2019 10/19/2019 0.20 11,137.0 11,684.0 PROD? DRILL TRIP T Continue RIH to window, PUW=37K 03:54 04:06 10/19/2019 10/19/2019 0.60 11,684.0 11,684.0 PROD1 DRILL REAM T Dress window, FS = 488 psi @ 1.9 bpm, mill at 1 04:06 0442 fpm from 11,684' on initial pass (oriented 5° ROHS), observe -90 psi motor work at -11,686.8', then clean to past bottom of window to11,700', back -ream at 5° ROHS, perform an addiontal as milled pass (down & up), clean bath ways 10/19/2019 10/19/2019 1.10 11,684.0 11,684.0 PROW DRILL REAM T Dry drift window up & down, 30 fpm, clean 04:42 05:48 Perform additonal reaming passes, 35R, 335R, & 185R, dry drift, clean up & down 10/19/2019 10/19/2019 1.90 11,684.0 60.0 PROD1 DRILL TRIP T POOH 05:48 07'.42 10/19/2019 10/19/2019 1.00 60.0 0.0 PROD1 DRILL PULD T At surface, Tag up space out. PJSM, PUD 07:42 08:42 BHA#4 Window dressing BHA 10/19/2019 10/19/2019 0.80 0.0 78.3 PROD1 DRILL PULD T M/U and PD BHA #5 Lateral drilling BHA with .5` 08:42 C 09:30 motor and DynaPilot Bi center bit 10/19/2019 10/19/2019 2.00 78.3 11,111.0 PROW DRILL TRIP T 00' - RIH BHA# 5, Shallow test agitator@ 500'- 09:30 11:30 Good 10/19/2019 10/19/2019 0.30 11,111.0 11,140.0 PROD1 DRILL DLOG T Log K1 for +18 -correction, PUW=33K 11:30 11:48 10/19/2019 10/19/2019 0.10 11,140.0 11,740.0 PR0D1 DRILL TRIP T Continue in well. Clean pass through window 11:48 1154 10/19/2019 10/19/2019 0.10 11,740.0 11,757.0 PROW DRILL DLOG P Log MADD Pass 11:54 12:00 10/19/2019 10/19/2019 1.60 11,757.0 11,889.0 PRODt DRILL DRLG P 11757', Drill, 1.88 BPM @ 4765 PSI FS, BHP=4155, RIW=10.8K, DHWOB=I.9K Swap 12:00 13:36 mud to system 1. New mud at bit 11,795' 10/19/2019 10/19/2019 0.10 11,889.0 11,889.0 PROD1 DRILL WPRT P 111,866, BHAwiper, PUW=37K. New mud around 13:36 13:42 got pressures Page 3114 Report Printed: 10/29/2019 Time Log & Summary Report Ai 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10116/2019 Rig Release: Time Log Our (hr) Start Deptlt (ftl B, EnE Depth (ftKB) Phase Op Cade Activity Cafe Tine P -LX OpereGon Start Time 10/19/2019 End Time 10/19/2019 2.20 11,889.0 12,155.0 PROD1 DRILL DRLG P 11889', Drill, 1.92 BPM @ 4870 PSI FS, BHP=4200, RIW=10.81k, DHWOB=2.3K. Trouble 1342 1OM95:54 getting angle to drop from 11970. Lower pump rate and increase WOB. 10/19/2019 10/19/2019 0.80 12,155.0 12,155.0 PRODt DRILL WPRT P Pull wiper to 11715. First wiper after drilling 400'. PUW=38K. Trip in slowly waiting to obtain 15:54 16:42 polygon extension 10/19/2019 10/19/2019 1.30 12,155.0 12,355.0 PRODi DRILL DRLG P 12155', Drill, 1.87 BPM @ 4810, BHP -4219 16:42 10/19/2019 18:00 10/19/2019 3.30 12,355.0 12,497.0 -F5-Roo DRILL DRLG P Drilling, PUW = 38K (obtain parameters), FS = 1100 psi @ 1.9 bpm, CWT = 4K on bottom, 1800 21:18 WOB = 2.5K, annular = 4224 psi (11.85 ppg @ window), WHP = 160 psi, pump = 5133 psi, drilling slowed at 12,389', avg ROP = 43 fph 10/19/2019 10/20/2019 2.70 12,497.0 12,520.0 PRODi DRILL DRLG P Drilling, CWT = 6.7K @ 3.8K WOB, annular= 4232 psi (11.85 ppg @ window), WHP - 204 psi, 21:18 00:00 pump = 5098 psi, pump sweeps as required, PUW = 38K from 12,504', pump 10 x 10 (LOVS with 2.5% Dri1lZOne to aid w/ bit balling), allow pill to exit with bit spinning off bottom, pump 5x5 sweeps, avg ROP = 8.5 fph 10/20/2019 10/20/2019 0.50 12,520.0 11,700.0 PRODt DRILL WPRT P Wiper to tubing tail, PUW = 35K, jog 7" casing 00:00 00:30 10/20/2019 10/20/2019 0.10 11,700.0 11,752.0 1ROD1 DRILL FLOG P Log RA for +5' correction 00:30 10/20/20 19 00:36 10/20/2019 0.40 11,752.0 12,520.0 PROD, DRILL WPRT P Wiper in-hole, RIW = 12K 00:36 10/20/2019 01:00 10/20/2019 1.30 12,520.0 12,575.0 PRODt DRILL DRLG P Drilling, FS = 1154 psi @ 1.9 bpm, CWT = 12K @ 0.6K WOB, annular =4224 psi, WHP = 193 01:00 02:18 psi, pump = 4972 psi, drilling break at -12,575' 1020/2019 10/20/2019 2.50 12,575.0 12,668.0 PROW DRILL DRLG P Drilling, CWT= 11.4K, W0B = 1K, annular= 4240 psi, WHP = 208 psi, pump = 5138 psi, avg 02:18 04:48 ROP = 37 fph 10/20/2019 10/20/2019 0.10 12,668.0 12,668.0 PROD1 DRILL WPRT P BHA wiper, PUW = 40K, RIW = 11.3K 04:48 10/20/2019 04:54 10/20/2019 2.00 12,668.0 12,746 0 -PROD DRILL DRLG P Drilling, FS = 1121 psi @ 1.9 bpm, CWT = 10.2K @ 1.9K WOB, annular = 4249 psi, WHP = 190 04:54 06:54 psi, pump = 5173 psi 1020/2019 10/20/2019 0.30 12,746.0 12,746.0 PROD, DRILL WPRT P 12746, BHA wiper, PUW-40K 0654 1020/2019 07:12 10/20/2019 4.00 12,746.0 12,950.0 PROD1 DRILL DRLG P 12746', Drill 1.88 BPM @ 5000 PSI FS, BHP=4165, RIW=11K, DHWOB=IK 07.12 10202019 11:12 1020/2019 0.50 12,950.0 12,950.0 PROD1 DRILL WPRT P 1000'wiper trip #1, PUW=40K. Some slight stacking @ 12600-12700 Lower speed / Rate 11.,2 1142 slightly 10/20/2019 10/20/2019 2.80 12,950.0 13,105.0 PROW DRILL DRLG P 1.88 BPM @ 5000 PSI FS, 11:42 1430 BHP 41601, 10/20/2019 10/20/2019 0.10 13,105.0 13,105.0 PRODi DRILL WPRT P BHA wiper, PUW=40K 14:30 1020/2019 14:36 10/20/2019 1.50 13,105.0 13,193.0 F5' DRILL DRLG P Drill,, 1.88 BPM @ 5085 PSI FS, 13105.1P 14:36 16:06 102020,9 10/20/2019 0.10 13,193.0 13,193.0 PROD1 DRILL WPRT P BHA Wiper, PUW=39K, RIW=BK 1606 1020/2019 16:12 1020/2019 1.80 13,193.0 13,302.0 PROD1 DRILL DRLG P 13193', Drill, 1.88 BPM @ 5065 PSI FS, 16:12 18:00 1 1 1 BHP=4274, 1020/2019 10/20/2019 0.70 13,302.0 13,350.0 PROD7 DRILL DRLG P D7C9@OB,analar= 4277 psi, pump 18:00 18:42 pump 5x5 sweeps Page 4114 Report Printed: 10/29/2019 '- Time Log & Summary Report AOGCC IR-23 , Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/1612019 Rig Release: Time Log Dur Statl B) En( Depth (nicB) phase Op Cotle Tme ActivRy CoEe P -T-X Operetbn Statl Tme Ertl Time 11n PROD1 DRILL WPRT P pulling 2,980 il,upto-6K(a1t12,791')WOB& 10/20/2019 10/20/2019 0 1.00 13,350.0 3, ,623.0 eiavyaot 18:42 1942 62K CWT, observe motorwork, jog 7" casing (pull heavy to varying degrees from -12,600' to -12,860', then return to normal weights) 10120/2019 10/20/2019 0.10 11,623.0 11,724.0 PROD1 DRILL DLOG P Window PUW=37K,log RAfor+9.5'correction, 19:42 10/20/2019 19:48 10/20/2019 0.70 11,724.0 13,350.0 PROD1 DRILL XPRT P Wiper in-hole 19:48 20:30 12,615' stack weight, PUW = 43K, -1K WOB, reduce rate to lbpm, stack at 12,605'(2.5K WOB), reduce rate to 0.9 bpm, 20 fpm, stack at 12,6821(2K WOB) & 12,693', reduce to 0.8 bpm, stack weight at 12,685', reduce speed to 6 fpm, work to 12,9701, begin increasing rate & RIH speed at 12,970'. Recap: Difficulty RIH 12,615' to 12,970', -15 fpm @ 1 bpm to get down 10/20/2019 10/20/2019 0.50 13,350.0 12,610.0 PROD? DRILL WPRT P Wiper back up-hole, attempt to cleanup 12,970' to 12,615', 1.9 bpm, 15-25 fpm, pull to 55K, at 20:30 21:00 12,986', 12,678' negative WOB tug, observe motor work, hole appears to be cleaning up 10/20/2019 10/20/2019 0.70 i2, 610.0 12,350.0 PROD1 DRILL WPRT P Wiper in-hole, stack at 12,612',1.0-1.2 bpm@ 10-25 fpm, attempt to increase rate at speed 21:00 21:42 once past 12,970', stacked weight at 13,179' RIW off bottom = 1.81K 10/20/2019 10/21/2019 2.30 13,350.0 13,467.0 PROD1 DRILL IT P Drilling, FS 11138 psi @ 1.9 bpm, CWT=-2.BK @ 0.9K WOB, annular = 4241 psi, WHP = 92 21:42 00:00 psi, pump = 5202 psi, avg ROP = 50 fph 10/21/2019 10/21/2019 1.80 13,467.0 13,569.0 PROD1 DRILL DRLG P Drilling, FS = 1152 psi @ 1.9 bpm, CWT =-2K @ 1K WOB, annular=4260 psi, WHP = 127 psi, 00:00 01:48 pump = 5236 psi, swap to new mud system #2, new mud hits bit at 13,530' 10/21/2019 10/21/2019 3.20 13,569.0 13,750.0 PR0D1 DRILL DRLG P New mud around, PUW = 42K (new ) 0 1.86 bpm, 3K@ p=46 01:48 05:00 WOB, annular68 CWT etIKn3 psi, WHIP = 278 psi, pump = 4910 psi, pump 5x5 sweeps 10/21/2019 10/21/2019 0.80 13,750.0 13,750.0 PR0D1 DRILLRWPRTP Wiper up-hole, PUW=42K 05:00 05:48 13,750.0 13,928.0 PRODl DRILL131-113=4304, I BPM 10121/2019 10/21/2019 3.70 RIW 0548 10/21/2019 09:30 10/21/2019 0.10 13,928.0 13,928.0 PROD1 DRILLBHA Wiper, PUW=45K 09:30 10/21/2019 09:36 10/21/2019 4.00 13,928.0 14,074.0 PRODi DRILL 13928' Dnall, 1.87 BPM @ 4937 PSI FS, 09:36 10/21/2019 13:36 10/21/2019 1.10 14,074.0 14,074.0 PROD? DRILL14074', Pull 500' wiper, PUW=43K.Good coming up. Stacking RIH. Reduce pump rate to .8 BPM. 13:36 1442 Reduce speed - 15 FPM. No DHWOB 10/21/2019 10!21/2019 1.10 14,074.0 14,088.0 PRODt DRILL DRLG P 14074'. 30241'14070 ROP down to 55195 I 10 FPH 14:42 1548 from 30 to 50 FPH 10/21/2019 10/21/2019 1.30 14,088.0 11,642.0 FROM DRILL WPRT P Stacking, Go to witPAIh Pull Very sticky, PUWo12,615 wiper window with sweeps, 12,970 to 1 15:48 17:06 p, Ratty with over pulls. Packing off coming up, with become detained @ packed off at 11,642', lose returns 10/21/201910/21/2019 0.30 11,642.0 11,642.0 PROD1 DRILL CIRC P backside, work pipe down, become free, regain 1706 17:24 returns Page 5/14 ReportPrinted: 1012912019 Start Time Entl 10/21/2019 10/21/2( 17:24 20:30 22:30LL'Sb 10/21 /2019 10/21. 22:36 23:24 23:24 10000 36 Time Log & Summary Report AOGCC IR -23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/1612019 Rig Release: Phase mp 5,5 sweeps, circulate bottoms up, pump x10 sweeps, decison made to wiper to swab dean up cased hole Continue Rim, VUvv = son at wnmow, weight at 11,681', PU & roll pumps, stack at 11,685', bdng on pump, jog 7", attempt to clean up near TOWS, stack again at 11,685', attempt at 0.25 bpm, stack at 11,683', attempt 20° R from as milled TF, stack at 11,683', attempt 15° LOHS, no good, confer with town, decison made to POOH for cleanout assembly Pump sweeps, open EDC, begin POOH /2019 0.90 78.0 0.0 mnU urrt "' 2 plugged noales, & 10 chippedibroken reamer cutters /2019 1 20 0.0 72.0 PROD1 DRILL PULD T motor s& 22..74"I D331 ridge -ser, slide in cea -out Assembly (0.5' e , MU to wil, check pack -offs. MU to coil 05:42 105:48 09:12 11:06 10/22/2019 10/22r 11:06 14:06 10/22/2019 10/22/: 14:06 15:12 t 0122/2019 107221, 15:12 16:06 10/22/2019 10/22/'. 16:06 18:12 10122/2019 10/22/ 18:12 18:18 10/22/2019 10/221 18:18 18:48 10/22/2019 10/221 18:48 18:54 10/22/2019 10/22 18:54 21:06 1.9 BPM @ 4680 PSI FSStack out @ 11694 with motorwork and reactive torque PUW=37K PUH, RBIH to 11699, Stack with motor work, PUH, Recip back to 11699. Recip with sweeps, RBIH stack with motor work @ 11703. PUH to 11651. Pump sweeps RBIH pass 11,700 to 11,800' 11,800 to 12,600 fairly clear Set down @ 12603. Reip to TT Word from town. Set anchor billet @ -12,190. PUH and work hole 12,400 to TT with sweeps BHA #6 Mill out 2.73" No Go Reconfig BHA. M7U BHA#7 with OH anchor billet. PD, M/U to coil and surface test. Stab on well. Tag up and space out inue in well, Close EDC @ 11638 Cle: through window down to set depth @ I1.8 oriented to 10° ROHS A depth and orientation. PU to 35K. Bi ps online. See tool shift @ 5100 PSI. 1 n 5K on anchor out after setting billet, PUW=39K, Op, :in cased hole up and space out, PUD BHA#7 billet: Time Log & Summary Report AOGCC 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/1612019 Rig Release : Time Log Stan Time End Time Dur mr) Swrt D) (WB) End DepiM1 (N(B) Phese Op Code Activity Code Operatbn 10/22/2019 10/22/2019 0.80 0.0 78.0 PROD? STK PULD BHA #8 (NOV agiator, 0.5°, & RB C1) 22:00 22:48 10/22/2019 10/23/2019 1.20 78.0 6,100.0 PROD1 STK TRIP w/ BHA#8, shallow test agitator, dp = 1180 22:48 00:00 RTIRIH i, good action at surface 10/23/2019 10/23/2019 0.90 6,100.0 11,100.0 PROD1 STK TRIP H w/BHA#8 00:00 00:54023/209 0/23/209 0.70 11,100.0 11,123.0 PROD? STK DLOG g K1 for +13' correction 00:54 01:00 1023/2019 10/23/2019 1.20 11,123.0 12,189.4 PROD1 STK TRIP T Contine RIH, PUW =39K @ window, re-boot BHI 01:00 02:12 direction software, unable to orient, trouble- shoot, resolve issue, clean through window, dry tag TOB at 12,191', bring on pumps, RBIH to mill 10/23/2019 1023/2019 0.80 12,189.5 12,190.5 PROD? STK KOST T FS = 1205 psi @ 1.9 bpm, begin milling on billet 0212 03:00 at 12,189.5', oriented 330" ROHS 1 ft/hr for 1 ft CWT = 15.5K, WOB = 0.3K, pump = 5126 psi 10/23/2019 10/23/2019 12,190.5 12,191.5 PROM STK KOST T Go to 2 ft/hr for 1 ft 0300 03:30 1023/2019 10/23/2019 12,191.5 12,192.5 PROD1STK KOST T Go to 3 ft/hr for 1 ft 03:30 0354 10/23/2019 10/23/2019 [0.40 12,192.5 12,202.0 PROD? STK KOST T Begin pushing on it, looking for WOB to gain 03:54 04:18 departure(10fph), CWT=13.1K,WOB=1.1K, pump=5162psi, increaseto 15fph, wmeupto 20 fph, go to 30 fph, go to 60 fph, off billet 10/23/2019 1023/2019 12,202.0 12,290.0 PROM DRILL DRLG T Drilling, CWT= 12.2K, WOB = 1.3K, annular= 04:18 05:00 4210 psi, WHP = 233 psi, pump = 5258 psi, pump 5x5 sweeps 1023/2019 10/23/2019 0.30 12,290.0 12,290.0 PROD1 DRILL WPRT T PUW = 39K, dry drift billet area up & down, clean 05:00 05:18 10/23/2019 10/23/2019 3.00 12,290.0 12,465.0 PROD1 DRILL DRLG T Drilling, FS = 1195 psi @ 1.9 bpm, CWT = 11.5K 05:18 08:18 @ 2.7K WOB, annular = 4216 psi, WHP = 196 psi, pump = 5534 psi, avg ROP = 58 fph 10232019 10/232019 3.20 72,465.0 12,590.0 PROM DRILL DRLG T Drilling, CWT = 9.4K @ 2.6K WOB, annular= 08:18 11:30 4222 psi, pump = 5441 psi, PUW = 39K from 12,521', avg ROP = 39 fph 1023/2019 10/23/2019 0.40 12,590.0 11,790.0 PROW DRILL DRLG T Wiper up-hale, PUW =40K 11:30 11:54 1023/2019 1023/2019 0.40 11,790.0 12,590.0 PROD1 DRILL WPRT T Wiper in-hole, setdown 2.6K at 12,401', ratty 11:54 1218 through to 12,515', RIW = 11.5K 1023/2019 10/23/2019 3.20 12,590.0 12,849.0 PROD1 DRILL DRLG T Drilling, FS = 1359 psi, CWT = 10.71K @ 3.2K, 12:18 1530 annular = 4227 psi, WHP = 167 psi, pump = 5535 psi, pump 5x5 sweeps as required, PUW = 43K from 12,849', avg ROP = 81 fph 1023/2019 10/23/2019 1.10 12,849.0 12,923.0 PROD1 DRILL DRLG T Drilling CWT =9.SK@1.1K WOB, annular= 15:30 1636 4233 psi, WHP = 115 psi, pump = 5555 psi, avg ROP = 67 fph 1023/2019 1023/2019 0.20 12,923.0 U,923.0 PROW DRILL WPRT T BHA wiper, PUW = 43K, grab missed survey 16:36 16:48 1023/2019 10/23/2019 1.40 12,923.0 13,010.0 PROM DRILL DRLG T Drilling, FS = 1350 psi @ 1.9 bpm, CWT = 11.5K 16:48 18:12 @ 1.25K WOB, annular = 4200 psi, pump = 5577 psi 10/23/2019 10/23/2019 0.70 13,010.0 11,668.0 PROD1 DRILL WPRT T PU Wt41 klis, -dean, PUH slowlywaiting for 18:12 18:54 sweeps to exit the bit - chase sweeps up hole on 2 nd wiper to the 7" @ 18:23. Slight neg WOB drag until above 12,236'. No signifcat overpulls, Billet and window clean. Page 7114 Report Printed: 10/29/2019 �. Time Log & Summary Report AOGCC 1 R-23 . Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10116/2019 Rig Release: Time Log atertTme End Tme Dur (hr) Stan DepM (flKB) End Depth (ftKB) am op Code Acbvity Code Tme P -T-X Operation 1023/2019 10/23/2019 0.70 11,668.0 11,644.0 PROD1 DRILL CIRC T Pack off inthe 7", Bitdepth 11,641' flow rate out dropped from 79 gpm to a low of 66 gpm. RBIH, 1854 1936 work pipe, regain returns. Send 5x5 sweep, while joging 7", send second 5x5, significant cutting at the shaker, no rocks. Chase bottoms up. • pullled through window @ 0.55 bpm and 10ft/min.B 10/23/2019 10/23/2019 0.30 11,644.0 71,092.0 PROD1 DRILL CIRC T Attempt to RBIH on wiper trip. set down twice@ 11,685' and 11,678' 19:36 1954 Pump 5x5 while PUH to tie in. 10/23/2019 10/23/2019 0.20 11,092.0 11,141.0 PROD1 DRILL DLOG T Tie into the KI for a+l3'cerrection. 19:54 2006 10/23/2019 10/2312019 0.40 11,141.0 11,647.0 PROof DRILL CIRC T RBIH, attempt to pas window, set down@ 2006 20:30 11,693' PUH park and open EDC, launch 5x5 x2 1023/2019 1023/2019 0.60 11,647.0 11,608.0 PROD1 DRILL CIRC T Chase sweeps to EDC while jogging 20:30 21:06 1023/2019 10/23/2019 2.00 11,608.0 71.0 PRODt DRILL TRIP T POOH chasing sweeps. Lots of cuttings and aluminum billet in sweeps, jog hole at 500'. 21:06 2306 more aluminum at surface. Blew down MM and chokes. Open, inspect and clean choke. - 1 bbl of returns on the trip. 10/23/2019 10/23/2019 0.80 71.0 0.0 PROD1 DRILL PULD T PUD BHA Bit balled p, packed with clay and some small 23:06 23:54 rocks, two plugged noules. plugged 10/23/2019 10/24/2019 0.10 0.0 0.0 PROD1 DRILL BOPS T Function test BOPE 23:54 00:00 1024/2019 10/24/2019 0.20 0.0 0.0 PROD1 DRILL BOPE T Function test BOPE 00:00 00:12 10/24/2019 10/24/2019 0.90 0.0 71.9 PROD1 DRILL PULD T PD BHA#9, cleanout assembly, 0.5° AKO motor 00:12 01:06 w D331 ridgeset bit. 1024/2019 10/24/2019 1.90 71.9 11,100.0 PROD1 DRILL TRIP T RIH 01:06 03:00 1024/2019 10/24/2019 0.10 11,100.0 11,130.7 PRODt DRILL DLOG T Tieintothe Ktfor+l1' 03:00 03:06 1024/2019 10/24/2019 0.30 11,130.7 11,693.0 PROD1 DRILL DLOG T Close EDC, continue to RIH, PU Wt @ 11,647' 03:06 0324 38 k lbs. Stage two sweeps 1024/2019 10/24/2019 0.30 11,693.0 11,716.0 PROW DRILL WASH T CT 4599 psi @ 1.9 bpm in/out, free sping diff 560 psi, BHP 4143 psi, WH 160 psi, IA 489 psi, 03'24 03:42 OA 0 psi. CT Wt 12 k lbs. Work down hole, slight motor work and WOB @ 11,699'. WOB increased to 3 k lbs with motor work @ 11,714', broke back then increased again by 11,716' 1024/2019 10/24/2019 2.50 11,716.0 11,680.0 PROD1 DRILL WASH T PU Wt 38 k lbs, PUH, start dragging, WOB to -7 k lbs @ 11,703', 5 k overpull on CT Wt, packing 03:42 06:12 off, work pipe, regain returns, pull to casing. RBIH to 11,720', some motor work & WOB. PU, 39 k lbs. Pull to casing, clean. Continue to Clean out taking 10' bites to 11,780', ciruculate bottoms up, dry drift window, full rate down to 11,780', clean 1024/2019 10/24/2019 2.70 11,680.0 72.0 PROD1 DRILL WPRT T Open EDC, pump 10x10 sweeps @ 2 bpm, 06:12 08:54 POOH, PJSM 1024/2019 10/242019 0.80 72.0 0.0 PRODt DRILL PULD T PUD BHA#9, mill came out 2.73" no-go 08:54 09:42 10/24/2019 10/24/2019 1.20 0.0 78.0 PROD? DRILL PULD T PD BHA#10 Drilling Assemlby (NOV Agitator, 0.5° AKO motor, & C1 bit), slide in cart, check 09:42 10:54 pack -offs, MU to coil, tag up, set counters 1024201910/24/2019 2.00 78.0 11,100.0 PROD1 DRILL TRIP T RIH w/BHA#10, shallow test, dp=1300 psi, 1 pump = 4910 psi, good 1054 1254 Page 8114 Report Printed: 10/292019 Time Log & Summary Report AOGCC t 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept : 10/16/2019 Rig Release: Time Log Dur SIM Depth (N-' EM Depth (WEI) Phase Op Cade Time Aovdy Code P -T-X Operation Star ime 10/24/2019 10/24/2019 End Time (hr) 0.10 11,100.0 11,131.0 PROW DRILL DLOG T Log K1 for 11.5', PUW = 35K 12:54 13:00 10/24/2019 10/24/2019 0.70 11,131.0 13,010.0 TR DRILL TRIP T through Continue RIH, stack at 11,682', PU &get right window clean, begin sending new mud 13:00 1342 (system #3), stack weight at 12,385', stack again at same depth, PU & work through at 0.8 bpm & 25 fpm, stack at 12,434' (PUW = 47K) Bore pressuring up, 1 -for -1 returns (likely plugged nozzles), begin pulling -14K WOB, —12,420', can orient (slight amperage increase), free pipe pulling to 70K, pump sweeps 1024/2019 10/24/2019 0.70 13,010.0 11,642.0 PRODi DRILL DRLG T bipm @ BO fpm) 9 build, 7 puImp sweeps, ps,, c rcula egh window 5 1342 14:24 bottoms up (w/ new mud) 10/24/2019 10/24/2019 0.90 11,642.0 12,385.0 PRODi DRILL TRIP T RBcirculat tt—ackat 11,679', roll sweeps to surfaceb'cleancth ou gh ain (3X), 1424 15:18 window, clean past billet, 10/24/2019 10/24/2019 1.20 12,385.0 12,440.0 PROD, DRILL TRIP T b, stacked at 12,385', Continue RIH in 1bites, work down taking bites, work to 12,396', 15:18 16:30 clean, RBIH, work to 12,416', PU, begin seeing weight at 12,396', losing hole, appears to be caving, continue working down to 12,420', PUW = 43K, 5K overpull at 12,386, begin seeing weight at 12,403', work to 12,445', PU, workf'drill" to get back to 12,445', work to 12,469' 10/24/2019 10/24/2019 1.90 12,440.0 11,631.0 PROD? DRILL TRIP T Become detained at 12,440', full returns, pull to 70K (-13K WOB), work pipe free, pump sweeps, 16:30 18:24 pull to BOW, jog build until full bottoms up of sweeps, pull through window at 0.5 bpm @ 10 fpm, jog 7" pumping sweeps, chase bottoms up. 10/24/2019 10/2412019 0.20 11,631.0 11,673.0 PROD, DRILL TRIP T RIH, attempt to dry drift window @ 20 ft/min, SD @ 11,683', PU 43 k lbs. PU, RBIH and pass 18:24 18:36 window cleanly. WOB spike to 2 k @ 11,702', fell off continued on in hole to 11,760' EOB. PUH through window -dean. 1024/2019 2.30 11,673.0 61.7 PROD1 DRILL TRIP T POOH spinning the bit, 1.9 bpm in and 1.45 bpm 10/24/2019 out. jog the tubing at 500'. 18:36 24 10/2019 20:54 10/24/2019 1.40 61.7 0.0 PRODt DRILL PULD T Bump UmosNAff hu. it amup, e o sut pace reamers sheared 20:54 22:18 off. 1024/2019 10/24/2019 1.10 0.0 72.9 PROD1 STK PULD T PD BHA#11, open hole anchored billet 2218 1024/2019 23:24 10/25/2019 0. 60 72.9 —-§TK 2,757.0 PROD1 TRIP T RIH w billet. 2324 1025/2019 00:00 10/25/2019 1.20 2,757.0 11,113.0 PROD, STK TRIP T RIH w billet. 00:00 10/25/2019 01:12 10/25/2019 0.20 11,113.0 11,146.6 DI STK DLOG T Tie into the Kt marker fora 14' correction. 01:12 01:24 12,141.8 PRODt STK WPST T ContinuePark 1025/2019 1025/2019 1.00 11,146.6 n cased hole abovve window, close EDG. 01:24 02:24 Attempt to RIH, S/D @ 11,709, 5 k WOB 45k PU, repeat 5 times, PU's ranged from 40 to 47 k lbs. saw -2.6 k WOB on one attempt. Rolled TF to various orientations after second stack. After 6 th attempt, RIH to 12,141.8'. Orient TF to 210° ROHS, PU to neutral weight online with the pump. Saw shear @ 4800 psi, WOB climbed to 1.4 k, set down to 4.3 k Itis - good set PU Wt 43 k Ibs. 102512019 10/25/2019 0.30 12,141.8 11,499.0 PR0D1 STK TRIP T PUH to cased hole. 02:24 02:42 Page 9114 Report Printed: 1012912019 Time Log & Summary Report AOGCC 1 R-23 . Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/16/2019 Rig Release : Time Log Start Tim End i�me Dur (hr) Start B) (ftKB) Eno B) (MB) Phase Op Code Activily Code Tme P -T-% Operation 10/25/2019 10/25/2019 0.60 12,141.8 11,499.0 PROD1 STK CTOP T Park and inspect fluid on off reel side right angle 02:42 03:18 drive. 10/25/2019 10/25/2019 1.90 11,499.0 72.0 PROW STK TRIP T Continue out of hole, PJSM 03:18 05:12 10/25/2019 10/25/2019 1.20 72.0 0.0 PROD1 STK PULD T PUD BHA 1, crew change 05:12 06:24 1025/2019 10/25/2019 1.10 0.0 78.0 PROD1 STK PULD T PD BHA #12, slide in cart, change out pack -offs, 06:24 0730 MU to coil, tag up, set counters 10/25/2019 10/25/2019 0.10 78.0 78.0 PROD? STK TRIP T RIH w/ BHA #12, pump pressure climbing, bore 07:30 07:36 notclimbing 1025/2019 10/25/2019 0.40 78.0 78.0 PROW STK PULD T Bleed off pump, Pop off, open DBV, stab back 07:36 08:00 on, complete PD 1025/2019 1025/2019 2.00 78.0 11,100.0 PROW T RIH w/ BHA #12, shallow test tools, 1.9 bpm, 08:00 10:00 pump = 4800 psi, dip = 1092 psi 1025/2019 1025/2019 0.10 11,100.0 11,119.0 PRODi DLOG T Log K1 for +21' 10:00 10:06 10/25/2019 10/25/2019 0.60 11,119.0 12,130.4 PROD1 rTKTRIP TRIP T Continue RIH, PUW @ window = 37K, clean 1006 10:42 through window, dry tag TOB @ 12,132', PUW = 41 K, bring up pumps 1025/2019 10/25/2019 2.30 12,130.4 12,131.0 PROD1 KOST T Milling at 12,130.4', FS = 1021 psi @ 1.9 bpm, 10:42 13:00 pump = 4906 psi, 1 Whir for 1 fl Stall at 12131.3', PUW = 42K, stall again at 12,131.24', stall at 12131.0, observe CWT climb while time milling, difficulty getting restarted, stick slipping, work down in 1/10's to find weight and get restarted, add additonal 1% 776 to system, creep down to 12,131.04' and go into stall 10/25/2019 10/25/2019 0.80 12,131.0 12,130.6 PRODi STK KOST 7 Continue attempting to get started, awaiting 13:00 1348 addition of lubes in system, stall again at 12,131.04', wiper up to BOW, awaiting lubed mud to bit, RBIH 1025/2019 1025/2019 0.80 12,130.6 12,131.4 PRODII STK KOST T With lube all the way around, put in auto driller at 13:48 14:36 1 ft/hr at 12,130.6' 10/25/2019 10/25/2019 0.50 12,131.4 12,132.4 PROD1 STK KOST T Go to 2 Whir for 1 R 14:36 15:06 1025/2019 10/25/2019 0.30 12,132.4 12,133.4 PROD1 STK KOST T Go to 3 ft/hr for 1ft 15:06 15:24 10/25/2019 10/25/2019 0.30 1,233.4 12,140.0 PRODi STK KOST T Go to 10 ft/hr, go to 20 fUhr 15:24 15:42 10/252019 10/25/2019 2.20 12,140.0 12,221.0 PROD1 DRILL DRLG T Off billet, drilling ahead, pump 5x5 sweeps 15:42 17:54 Unload ODS PDL 10/25/2019 10/25/2019 0.10 12,221.0 12,221.0 PRODt DRILL WPRT T Dry drift billet up & down, clean 17:54 18:00 1025/2019 10/25/2019 1.50 12,221.0 12,271.0 PROD1 DRILL DRLG T CT 5310 psi @ 1.9 bpm in and out, FS 1127 psi, 18:00 19:30 BHP 4189 psi - targeting 11.8 @ the window, CT Wt 11.5 k lbs, WOB variable to 3 k lbs. 10/25/2019 10/25/2019 1.50 12,271.0 11,695.0 PRODi DRILL WPST T PU on wiper#1, PU Wt42 k lbs. 19:30 21:00 Decision made to come all the way to the 7" post billet sidetrack. Jog the build with sweeps timed out in build and fight before exiting the window. Jog 7" and chase up hole with sweeps RBIH 1025/2019 10252019 0.10 11,695.0 11,728.0 PROD1 DRILL DLOG I T Tie into the RA tag for +5.5' correction 21:00 21:06 10/25/2019 10/25/2019 0.40 11,728.0 12,271.0 PROD1 DRILL WPRT T RBIH post wiper to window 21:06 21:30 Page 10114 Report Printed: 10/2912019 Time Log & Summary Report AOGCC IR -23 . Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept : 10/16/2019 Rig Release Time Log StarlTme End Time our On Start Depth (ftKa) Em! Depth Me) Mase Op Code AdiAy Code Time P -T-X Operation 10/25/2019 10/25/2019 1.10 12,271.0 12,371.0 FROM DRILL DRLG T CT 5450 psi @ 1.90 bpm in&out, Free spin 956 21:30 22:36 psi, BHP 4202 psi, OBD, WOB to 3 k lbs, Average ROP over interval 90 R/hr 10/25/2019 10/25/2019 0.20 12,371.0 12,371.0 FROM DRILL WPRT T PU on first short wiper 214'staying below the 22:36 22:48 billet, PU Wt 43 k lbs - RBIH 10/25/2019 10/25/2019 0.60 12,371.0 12,494.0 PRODi DRILL DRLG T CT 5450 psi @ 1.90 bpm in&out, Free spin 956 2248 23:24 psi, BHP 4202 psi, OBD, WOB to 3 k lbs, PU - 12,443' to roll TF - 41 k lbs Average ROP over interval 205 ft/hr 10/25/2019 10/26/2019 0.60 12,494.0 11,713.0 FROM DRILL WPST T PU on wiper#2- long wiper to window PU Wt 42 23:24 00:00 k lbs. 10/26/2019 10/26/2019 0.70 11,713.0 11,699.0 FROM DRILL WPRT T Continue up hole on long wiper to the window 00:00 0042 Jog the build with sweeps timed out in build and fight before exiting the window. Jog 7" and chase up hole with sweeps RBIH 10/26/2019 10/26/2019 0.10 11,699.0 11,733.0 PROD1 DRILL DLOG T Tie into the RA tag for+3'correction 0042 00:48 10/26/2019 10/26/2019 0.30 11,733.0 12,494.0 FROM DRILL WPRT T RBIH post wiper to window 00:48 01 06 10/26/2019 10/26/2019 2.10 12,494.0 12,632.0 PROD1 DRILL DRLG T CT 5499 psi @ 1.90 bpm in & out, Free spin 01:06 03:12 1 1042 psi, BHP 4210 psi, OBD, WOB to 3 k lbs, 10/26/2019 10/26/2019 0.40 12,632.0 12,632.0 PROD1 DRILL WPRT T PU on first short wiper 460' staying below the 03:12 0336 billet, PU Wt 41 k lbs - RBIH 10/26/2019 10/26/2019 2.40 12,632.0 12,695.0 PROD1 DRILL DRLG T CT 5649 psi @ 1.90 bpm in & out, Free spin 03:36 06:00 1183 psi, BHP 4232 psi, WH 67 psi, IA611 psi, OA 8 psi, OBD, CT Wt 9.6 k lbs WOB to 2.2 k lbs 10/26/2019 1026/2019 1.50 12,695.0 12,753.0 PROD1 DRILL DRLG T Drilling, CWT= 7K @ 2.8K WOB, annular= 06:00 07:30 4257 psi, WHP = 70 psi, pump = 5848 psi, significant clay over shakers, pump 2x2 sweeps 10262019 1026/2019 1.10 12,753.0 11,700.0 PROD1 DRILL WPRT T Wiper to tubing tail, PUW = 40K, pump 5x5 07:30 08:36 sweeps, jog build, stack weight at 11,716', pull through window, jog 7", jet XN nipple Stack at 11,688'(5.7K WOB), PUW = 45K, through window clean at 30 fpm 1026/2019 10/26/2019 0.10 11,782.0 11,728.0 FROM DRILL DLOG T Log RA tag for+5' correction 08:36 0842 j 1026/2019 10/26/2019 0.50 11,728.0 12,753.0 PROW DRILL WPRT T Wiper in-hole, weight bobbles at beginning at 08:42 09:12 -12,730', RIW = 10K 1026/2019 10/262019 1.00 12,753.0 12,850.0 PROD1 DRILL DRLG T Drilling, FS= 1150 psi @ 1.9 bpm, CWT = 101<2 09:12 10:12 1.4K WOB, annular=4249 pis, WHP = 18 psi, pump= 5784 psi, difficulty dropping Inc, lower to 1.75 bpm per DD request, avg ROP = 97 fph 10/26/2019 10/26/2019 0.40 12,850.0 12,850.0 PROD1 DRILL WPRT T 400'wiper up -hole, PUW= 38K, stack weight at 10:12 10:36 1 -12,650'-12,675'. RIW = 10.8K 10/26/2019 10/26/2019 2.20 12,850.0 12,950.0 FROM DRILL DRLG T Drilling, FS = 940 psi @ 1.7 bpm (rate to aid in 1036 12:48 dropping inclination), CWT = 9.8K @ 1.2 WOB, annular= 4274 psi, WHP = 53 psi, pump = 5187 psi, ROP slows, avg ROP = 45 fph, pump 2x2 sweeps 1026/2019 1026/2019 1.10 12,950.0 11,700.0 PROD1 DRILL WPRT T Wiper to tubing tail, PUW = 40K, 2x2 timed for 12:48 13:54 EOB, small tug pulling past billet, WOB tug at 11,754', partial pack -off (minor), turn around & stack 12,708', PU, stack at 12,715' (pass 12,715' at 5 fpm), dean through window, jet XN nipple, stack at 11,688' (2X), 10/26/2019 10262019 0.10 11,700.0 11,723.0 FROM DRILL DLOG T Log RA for +5' correction 1354 1400 1 Page 11114 Report Printed: 10/29/2019 r Time Log & Summary Report AOGCC 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 1011612019 Rig Release: Time Log Start Tme End Tone Dur (ho Start Depth ("ka) EMKB) (flKe) Phase Op Code T.—.p AcfiR Cede T -T-X Operation at 12,660' 10/26/2019 10126/2019 0.60 11,723.0 12,950.0 PROW DRILL WPRT per own gpvr eology), get by at -1 bpm ak t 15-30 14:00 14:36 fpm, RIW = 9.9K 10-26/2019 10/26/2019 1.20 —12,950.0 --T3-0-51,.0 PROD1 DRILL DRLG T D@ril1 K W0B� anOnulars=@4268 psi, WHP = 15 psi, 14:36 15:48 pump = 5805 psi 10/26/2019 10/26/2019 0.40 13,051.0 —T-3-051,.0 PROD' DRILL WPRT T 12boto pmUW a@P25 fph from 112,6805'_ RBIOOg stack 15:48 16:12 weight at 12,738', PUW = 39, RIW = 10.5K 10/26/2019 10/26/2019 1.30 13,051.0 —T3—,151.0 PROD1 DRILL DRLG T D@ri10.9K WOB,I144 ps, annular=4308 psi, pump = 6865 16:12 17:30 psi 10/26/2019 10/26/2019 -140 13,151.0 11,700.0 PROD, DRILL WPRT T Wiper[tottubinwn doiµPUW=39wiper. PUH on long 1730 18:54 Draggy section from 12,697 - 12,297' -0.3 to -.8 k lbs WOB w/motor work. Pulled 15 k lbs over CT Wt w neg WOB and packed off @ 11,758' Worked pipe 4 times Worked free, returns returned, RBIH to 11,811' PUH, -1k WOB tug @ 11,678' Jet 7" pump 2x2 sweep. RBIH - dean. 10/26/2019 10/26/2019 0.10 11,700.0 11,723.0 PROD1 DRILL DLOG T Tie int the RA tag for a+5.5' 18:54 10726/2019 19:00V. 10/26/2019 0.80 11,723.0 13,151.0 PRO01 DRILL WPRT T Q, IH per dtowntPUo wiWt43 k lbs, -2.5 k WOB 19:00 19:48 12,664' WOB to 1.5k lbs 12,757' WOB to 1.2 k lbs 12,875' WOB to 3 K set down, PU Wt 38 k lbs, cut pump to 1.66 bpm -07 k WOB Continue in hole 10psi /26/2019 1012612019 1.80 13,151.0 13,252.0 PRODt DRILL DRLG T gHP 4314Tt 5834 sps@ targeting 11 Tll�urT Not@ he window, 19:48 21:36 currently 12.36 ppg @ the bit. WH 78 psi - open choke, IA 661 psi, OA psi. Ct 10 k falling to 0 over drilled interval. WOB 1.5 k lbs. 10/2 6/2019 10/26/2019 1. 00 13,252.0 13,252.0 PROD1 DRILL WPRT on short -'Per #1 PUH to 12,843'-400' 21:36 22:36 RBIH, pull short jog/geo wiper to discuss planfonvard for invert, RBIH 10726/20,9 10/27/2019 140 —73—,252.0 13,340.0 PRODt DRILL DRLG fT Psi, BHP 4335 psi bCrt W[ auk Ibs�WOB 113871bs. 2236 10/27/2019 00:00 10/27/2019 0.20 13,340.0 13,350.0 PRODt DRILL DRLG Continue to drill ahead. 00:00 00:12 10/27/2019 1.60 13,350.0 11,700.0 PROD, DRILL WPRTwindow.4 klbs, PUH on long wiper to the 10/27/2019 00:12 01:48 WOB to -3.3 k lbs tug at 12,626' Time first sweep to exit @ 11,800'. Pull to 11,760' while sweep exits, RBIH to 12,000'. PUH cutting speed @ 11,740' letting sweep exit. @ 11,720' cut pump to 0.55 bpm and pull @ 5 ft/min through window in to 7" -1k WOB lug @ 11,678 while pulling past the window Jet 7" chase bottoms up. RBIH @ 30 ft/min through window 5 ft/min once in open hole. 3K WOB spike @ 11,685' 1027/2019 10!27/2019 0.10 11,700.0 11,736.0 PR OD1 DRILL DL L. T Tie int the RA tag for a +7' 01:48 01:54 Page 112114 Report Printed: 10/29/2019 Time Log & Summary Report AOGCC 1 R-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept: 10/1612019 Rig Release Time Log Our Start Depth End Depth Time P Start Tme End rime Mo (ftK8) (ftKe) Phase Op Code A6vdy Code -TX Operabon 10/27/2019 10/27/2019 0.80 11,736.0 13,352.0 PROW DRILL WPRT T RBIH post wiper to window. 01:54 02:42 12,900' S/D w 2 k WOB, PU 41 k Ibs 13,157' S/D w 2.3 k WOB, PU 42 k Ibs 13,238' SID 3 times, PU up to 46 k lbs, PUH, RBIH, cut rate to 0.5 bpm, 30 ft/min. Walk rate up after 13,250 Continue to RIH 10/27/2019 10/27/2019 1.80 13,352.0 13,461.0 FROM DRILL DRLG T Ct 5930 psi, @ 1.9 bpm in/out. FS 1148 psi, 02:42 04:30 BHP 4360 psi - targeting 11.8 @ the window, currently 12.56 ppg @ the bit. WH 16 psi - open choke, IA 648 psi, OA 8 psi. CT RIH WT 9 k, OBD 2.5 k lbs, WOB 1.25 k lbs. 10/27/2019 10/27/2019 0.40 13,461.0 13,461.0 FROM DRILL WPRT T PU Wt 39 k lbs, PUH on short wiper#1 PUH to 04:30 04:54 13,060' -400' RBIH Set down @ 13,156'- PU proactively cut rate from 1.9 to 1.56 Continue to RIH @ 40 ft/min 10/27/2019 10/27/2019 2.00 13,461.0 13,560.0 PROD? DRILL DRLG T CT 5935 psi, 1.89 bpm in/out. Free spin 1111 04:54 06:54 psi, BHP 4338 psi. Ct Wt 6 k lbs, WOB 1.3 k lbs., pumps 2x2 sweeps 10/27/2019 10/27/2019 1.30 13,560.0 11,700.0 FROM DRILL WPRT T Wiper to tubing tail, PUW = 42K, pump sweeps 06:54 08:12 for EDB, WOB tug -12,660% clean past billet, jog build, small tug through window, jog 7". RBIH through window, setdown at 11,688', roll bit, stack again at 11,683', again at 11,678'(3X), change TF, get through at 5 fpm 10/27/2019 10/27/2019 0.10 11,700.0 11,718.0 PROD1 DRILL DLOG T Log RA for+Tcorrecdon 08:12 08:18 10/27/2019 1027/2019 1.10 11,718.0 13,560.0 PROM DRILL WPRT T Wiper in-hole, clean past billet, reduce rate & 08:18 0924 speed beginng 12,615', ratty 13,126' to 13,300', RI W = 4K 1027/2019 10/27/2019 1.90 13,560.0 13,660.0 PROD- DRILL DRLG T FS = 1088 psi @ 1.9 bpm, CWT = 5.4K @ 0.8K 09:24 -1:18 WOB, annular = 4400 psi, pump = 5924 psi, choke wide open, begin pumping mud system #4, at the bit 13,592', avg ROP = 53 fph 1027/2019 10/27/2019 0.70 13,660.0 13,660.0 FROM DRILL WPRT T 400' wiper, PUW = 42K, stacking at 13,544'- 11:18 12:00 1 1 13,589', RIW = 6K 1027/2019 10/272019 2.00 13,660.0 13,760.0 FROM DRILL DRLG T Drilling, FS = 1038 psi @ 1.9 bpm, CWT =4.3K 1200 1400 @ 1.2K WOB, annular =4291 psi, WHIP =92 psi, pump = 5418 psi, avg ROP = 50 fph 10/272019 10/27/2019 2.40 13,760.0 11,100.0 PROD1 DRILL WPRT T Wiper to tubing tail, PUW = 44K, pulled heavy at 1400 16:24 12,700' & 12,626', jog build Pull heavy at 11,736, RBIH, stack weight, pressuring up annular, parital pack -off (have returns), can orient, pump 5x5 sweeps, work pipe, pop free working down, RBIH, jogging awaiting sweeps, stack on billet, run through to verify clean, sweeps well up -hole, pull through window (0.5 bpm @ 5 fpm), jog 7", jet XN nipple, difficulty working through window (5 set -downs) 1027/2019 10/272019 0.20 11,100.0 11,136.0 PROD1 DRILL DLOG T PUH & log K1 for+9.5' 16:24 16:36 10/27/2019 1027/2019 0.50 11,136.0 11,688.0 PROM DRILL WPRT T RBIH, stack at 11,688', orient TF 10"R of milled, 16:36 17:06 attempt rolling TF with WOB, no good, pull up to 35K (1.3 WOB), roll TF to "pop" through, no good, attempt again at 30 fpm, no good, PU pump for a bit in 7", attempt 20°L at 35 fpm 1027/2019 10/27/2019 2.60 11,688.0 72.0 PRODI DRILL TRIP T PUW = 42K.. pumps 5x5 sweeps, circulate 17:06 19:42 bottoms up POOH chasing sweeps to surface on wiper trip. Found some small savings in the returns on the wiper trip, first rocks to surface, Geo says B formation. Page 13114 ReportPrinted: 10/2912019 Time Log & Summary Report AOGCC IR-23 Well Name: 1R-23 Rig Name: NABORS CDR3-AC Job type: DRILLING SIDETRACK Rig Accept : 10/1612019 Rig Release Time Log Stah Time End Time our (hr) Start Depth (111(8) End Depth (111(e) Phase Op cod. AchOy Code Time P -T-% Operahon 10/27/2019 10/27/2019 1.00 72.0 0.0 PROD? DRILL PULD T Bump up, PUD BHA# 12 19:42 2042 Bit clean, no day, all nozzles clear, one chipped reamer. 10/27/2019 10/27/2019 1.30 0.0 62.0 PROD1 DRILL PULD T PD BHA#13 D331 dean out assembly, sans 2042 22:00 resistivity and agitator. Inspect pack off - good 10/27/2019 10/28/2019 2.00 62.0 10,645.0 PRODi DRILL TRIP T Bump up, set counters, RIH 22:00 0000 10/28/2019 10/28/2019 0.10 10,645.0 11,105.0 PROD1 DRILL TRIP T Bump up, set counters, RIH 00:00 00:06 1028/2019 10/28/2019 0.10 11,105.0 11,126.0 PROD? DRILL DLOG T Tie into the K1 for+11' correction. 00:06 0012 1028/2019 10/28/2019 0.30 11,126.0 11,672.0 PROD1 DRILL TRIP T Close EDC, continue in hole. 00:12 0030 Call from Geo / MWD- mistake on tie in, Pick up. add additional +10 feet to depth 1028/2019 10/28/2019 0.70 11,126.0 11,688.0 PROM DRILL WASH T RIH pumping 1.86 bpm FS 453 psi, Starttaking 00:30 01:12 weight 11,684' slight moto work, sharp increase in WOB ( 1.1k) @ 11,687.5 WOB limbed to 4.5k tool face torqued up. Down on the pump PU 40 k lbs, dean. RBIH @ 1.8 bpm @ ift/min, same results PU Wt 37k. RBIH, creep forward from 11,687, WOB clamed to 2.8 k lbs, park, WOB increased to 4 k stalled. 1028/2019 10/28/2019 0.70 11,688.0 11,688.0 PROD1 DRILL TRIP T PUH while consulting w town. 01:12 01:54 1028/2019 10/28/2019 0.60 11,688.0 11,711.0 PROD1 DRILL WASH T RIH 5 times unsucessfully 01:54 02:30 0.5 bpm - 25 ft/min 0.5 bpm - 30 ft/min 0.35 bpm - 18 ft/min 1.2 bpm - 15 ft/min 1.4 bpm - 30 ft/min RIH to 11,687.2' at 1.90 bpm, just shy of obstruction, PUH washing @ 1.90 bpm to 11,660' RIH pumps off, - pass window cleanly. Start seeing WOB @ 11,711' PUH 10/28/2019 10/28/2019 0.40 11,711.0 11,624.0 PROM DRILL WASH T Attempt to pull into casing, stuck and packed off 0230 02:54 @ 11,624' Work pipe, regain circulation, pull free 10/28/2019 10/28/2019 0.20 11,624.0 11,711.0 PROD1 DRILL WASH T RBIH pumping 1.8 S/D at 11,188'. PU cut pump 02:54 03:06 pas through window clean- Ramp pump rate to 1.8 and RIH to 11,711' 10/28/2019 10/28/2019 1.10 11,711.0 11,650.0 PROM DRILL WASH T Attempt to PUH. Packed off and became stuck. 03:06 0412 getting 1.2 bpm returns for 1.80 bpm in. Worked pipe from 11,701-11,699 Ct Wt to 46 k, WOB to -5 k, returns increased, worked pipe, domped choke, no luck, returns diminished. Consult with town, HOT rotating freely, returns stedy at 1.6 bpm Work pipe to 80 k three times. Returns regained as pipe started to move on third try. Pulled free. 1028/2019 10/28/2019 11,650.0 78.0 PROM DRILL TRIP T PUH chasing sweeps on swab wiper 04:12 04:12 1 I I 1028/2019 10/28/2019 78.0 PROD1 PUD BHA#13 04:12 04:12 Page 14/14 Report Printed: 10/29/2019 OW m zL a lalos mgouµHO aW 880'6L � al tBdLIEZ-at aW DEUR @ 1�11!81oV3uy-HO aW .oWa �D al ZedOCZ-at aW ,oeL'EL 0 al e9dtiEz-at OW ,609' L L le SOS z/ L-£ (00-oN 'OI ulw „9L'Z) OW 969'L L le alddiu-NX SILO (OI „69'Z) OW d99' L L le japed SH 184BO OW .999' L L le'd8d ,.Z/L-£ J94BO (OI .,£L9'Z) OW ,0£9' L L @ alddiu 6wpuel mllooleS X SIlO 594' L L le laipuew Im se6 Suo .,Z/ L-£ . L9Z£ le lwpuew N se6 oowe0 ,.Z/L-£ ooepns of 6ulgnl PJ9 3n3 99-f #£'6 „Z/L-£ OW .9M le ASSS W-d021100weO Z/L-E ollewo4a5 alo juwlno EZ -H1 OW.9LL'U aoys 09-1 #9Z ..L OW ,OLLI L -.O LL' L L sped pues-O OW,LE£9 aoys 99-f #9£ „9/S-6 OW .EZ L loi aoys Ob -H #Z9 ..9 L Loepp, Victoria T (CED) From: Loepp, Victoria T (CED) Sent: Tuesday, October 29, 2019 10:18 AM To: McLaughlin, Ryan Cc: Ohlinger, James J Subject: KRU 1 R-231-11(PTD219-128) Operations Shutdown Request Ryan, Verbal approval is granted for the Operations Shutdown for CRD3-AC for KRU 1R-23L1(PTD 219-128). Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria LoeppCd)alaska.00v CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)7931247 or victoria Loeou'aalaska.aov From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Sent: Tuesday, October 29, 2019 10:13 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Cc: Ohlinger, James J<James.J.OhIinger@conocophi IIips.com> Subject: 111-23 (PTD 191-101) Operations Shutdown Request Hello Victoria On October 16th CDR3-AC rigged up to drill a tri -lateral project on 1R-23. After 3 unsuccessful attempts at drilling the 111-231-1 lateral, primarily due to hole cleaning issues in the 7" production casing, the decision was made to rig down CDR3-AC from 1R-23 and set the well up for a cement pilot hole exit for the rig to come back at a later date and complete the scope of the project under the approved PTD. In preparation for resuming CTD operations on this well, perforations will be shot in the tubing tail, cement will be pumped to occupy the 7" casing and plug off C -sand perforations, and the XN nipple in the tubing tail will be milled out. CDR3-AC will mill a cement pilot hole, set a 3-1/2" whipstock, and mill a 2.80" window in the production casing at a depth of 11,662' MD and complete the original scope of the project under the existing permits. We are requesting verbal approval for an Operations Shutdown with the Sundry to be submitted today. We will also submit a subsequent sundry request for cement -squeezing the C -sand perforations and setting a new whipstock prior to beginning the service coil work. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 Loepp, Victoria T (CED) From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Sent: Tuesday, October 29, 2019 10:14 AM To: Loepp, Victoria T (CED) Cc: Ohlinger, James J Subject: RE: [EXTERNAL]KRU 1R-23(PTD 191-101); KRU 1R-23L1(PTD 219-128) Operations Shutdown Follow Up Flag: Follow up Flag Status: Flagged Hello Victoria, I have sent a request for verbal approval for Operations Shutdown in a separate email. We plan on resuming drilling in December which should fall within the 60 days period. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Tuesday, October 29, 2019 9:57 AM To: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Cc: Ohlinger, lames J <James.J.Ohlinger@conocophi IIips.com> Subject: [EXTERNAL]KRU 1R-23(PTD 191-101); KRU 1R-23L1(PTD 219-128) Operations Shutdown Ryan, KRU 11-10(201-071) CTD drilling interruption was different. Only +100' out of the window was drilled. In addition, KRU 11-10 motherbore was planned to be put back on production. For KRU 1R-23L1(PTD 219-128), three plugbacks —1000- 3000' MD per lateral were drilled. These drilling records should be captured under KRU 1R-23L1(PTD 219-128). This is an Operations Shutdown under this PTD. Please submit a 10-403 Sundry for Operations Shutdown approval(20 AAC 25.072(a)). Will drilling be resumed within 60 days? The AOGCC should be notified for verbal approval for an Operations Shutdown with the Sundry to follow imminently. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil 8 Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria Loeoo(aalaska.gov 1 R-23 Current CTD Schematic 18" 62# H-40 shoe 123' MD 9.5/8" 36# J-55 shoe 6331' MD KOP C 11,682' MD va7"HEW C -sand parts 11,71(Y-1 770'MD 7" 26# L-80 Shoe 12,178' MD 3.112 Camco TRDP-1A SSSV at 1816' MD 3.1/2" 9.3#J-55 EUE 8rd Tubing to surface 3111" Camco gas lift mandrel at 3251' 3.1/2" OTIS gas lift mandrel at 11,485' OTIS X Selective landing nipple @ 11,530' MD (2.813" ID) Baker 31/2" PBR at 11,568' MO Baker HB packer at 11,581' MD (2.89" ID) OTIS XN-nipple at 11,598' MO (2.75" min ID, NO-GO) 3-1/7' SOS at 11,609' MD 1R-23L1PB3 TO 013,780' MD 1R-23L1P82 TO 0 13,010' MD OH -Anchor Baal @ 12,130' MD 1R --Inn 1 TD 014,OW MD OH-Awt w BIM 012,190' MD CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or victoria Loeoo@alaska aoy From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Sent: Tuesday, October 29, 2019 9:18 AM To: Loepp, Victoria T (CED) <victoria loepp@alaska.gov> Cc: Ohlinger, James J <James J Ohlinger@conocophillips.com> Subject: RE: [EXTERNAL]KRU 1R-23(PTD 191-101) CTD Status Hello Victoria, We did mill a window off of a High Expansion Wedge at 11,682' MD and drilled three plugback that were not lined. I've attached a current CTD schematic of progress to date. We will submit a sundry for plugging the C Sand perforations and setting a new whipstock this afternoon, as well as close out the current sundry (319-421) for setting the High Expansion Wedge that is currently in the well. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Tuesday, October 29, 2019 8:27 AM To: McLaughlin, Ryan <Ryan McLaughlin@conocophillips.com> Subject: [EXTERNAL]KRU 1R-23(PTD 191-101) CTD Status Ryan, Was the window milled? Any drilling? If the 7" is cemented, then you will be plugging the C Sand perforations and the sundry will be a plug for redrill. A current status WBS would be useful. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil 8 Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria LoepI20alaska.00v CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)7931247 or victoria Loepp,, alaska.aov From: McLaughlin, Ryan <Ryan.McLauahlin@conocophillips.com> Sent: Monday, October 28, 2019 1:41 PM To: Loepp, Victoria T (CED) <victoria loepp@alaska.aov> Subject: RE: [EXTERNAL]KRU 1R-23 Operations Shutdown Victoria, I've attached a PDF of the email. Let me know if you have trouble opening. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 From: Loepp, Victoria T (CED) <victoria.loepp@alaska.eov> Sent: Monday, October 28, 2019 1:35 PM To: McLaughlin, Ryan <Ryan McLaughlin@conocophillips.com> Subject: Re: [EXTERNAL]KRU 1R-23 Operations Shutdown Unable to open attachment. Please resend in different form - Sent from my iPhone On Oct 28, 2019, at 1:12 PM, McLaughlin, Ryan <Ryan McLaughlin@conocophillips.com> wrote: Victoria, We encountered a very similar situation in February of this year where we moved CDR3 off of the well in order to perform some wellwork before making another attempt at drilling the laterals in June. I've attached the email where you stated that a sundry for operations shutdown was not required. Similarly, in our current situation on 111-23 we are not shutting down operations, we will be moving the CDR3 off the well to prepare it for a different type of window exit, and returning to continue drilling under the approved permits as soon as we can. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 From: Loepp, Victoria T (CED) cvictoria loepp@aIaska.gov> Sent: Monday, October 28, 2019 11:34 AM To: McLaughlin, Ryan <Ryan McLaughlin 2conocophillips.com> Subject: [EXTERNAL]KRU 111-23 Operations Shutdown Ryan, Please submit a sundry for Operations Shutdown as soon as possible with plans outlined to return to the well. Thanx, Victoria Sent from my iPhone On Oct 28, 2019, at 11:05 AM, McLaughlin, Ryan <Ryan McLaughlin eco nocophi Ili ps.com> wrote: Hello Victoria, I would like to give you a quick operations update for 1R-23. While drilling the 111-231-1 lateral, we struggled with hole cleaning issues in the 7" casing above our High Expansion Wedge. After our third unsuccessful attempt at drilling this lateral we made the decision to temporarily suspend rig operations and RDMO to our next well. After rigging off CDR3 from IR -23, we plan on submitting a sundry to perforate the tubing tail with E - line and pump cement in the 7" casing with service coil. This will set us up to return to 1R-23 as soon as possible with CDR3 and drill the permitted laterals from a cement pilot hole window exit. Please let me know if you have any questions. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 <mime -attachment> THE STATE 01ALASKA GOvE.RNOR MIKE DUNLEAVY Kai Starck CTD Director ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk River Oil Pool, KRU 1R -23L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 219-128 Surface Location: 4854' FNL, 144' FWL, SEC. 17, T12N, R10E, UM Bottomhole Location: 1775' FNL, 3116' FWL, SEC. 9, T12N, R10E, UM Dear Mr. Starck: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc,olasko.gov Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is fora new wellbore segment of existing well Permit No. 191-101, API No. 50-029-22200- 00-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, Daniel T. Seamount, Jr. Commissioner DATED this27 day of September, 2019. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMk>_ ON PERMIT TO DRILL 20 AAC 25.005 1 a. Type of Work: • Drill ❑ Lateral ❑' Redrill ❑ Reentry ❑ 1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ Stratigraphic Test ❑ Development - Oil ❑� ' Service - Winj ❑ Single Zone ❑' • Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ 1 c. Specify if well is proposed.for: Coalbed Gas ❑ Gas Hydrates ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑✓ Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska, Inc. Bond No. 5952180 . KRU 1 R-231_1 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 14,975' TVD: 7033' 7. Property Designation:, . Kuparuk River Field / Kuparuk River Oil Pool 4a. Location of Well (Governments] Section): Surface: 4854' FNL, 144' FWL, Sec 17, T12N, R10E, UM ADL 25627 ALK 2560 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 4575' FNL, 1802' FWL, Sec 9, T12N, R10E, UM LONS 83-134 10/1/2019 9. Acres in Property: 14. Distance to Nearest Property: Total Depth: 1775' FNL, 3116' FWL, Sec 9, T12N, R10E, UM 2560 4790' ' 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 88' 15. Distance to Nearest Well Open Surface: x- 539830 • y- 5991630 • Zone- 4 GL / BF Elevation above MSL (ft): 45' a to Same Pool: 2918', 1R-35 16. Deviated wells: Kickoff depth: 11,680 ' feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: 99 degrees Downhole: 3515 1 Surface: 2841 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 3" WA - - - - - - - - Unlined delineation lateral w/anchored billet at 14,100' MD 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 12180' 7004' N/A 12178' 7003' N/A Casing Length Size Cement Volume MD TVD Conductor/Structural 79' 16" 331 sx AS 1 123' 123' Surface 6289' 9-5/8" 1300 sx PF E, 630 sx Class'G' 6331' 4072' Production 12149' 7" 380 sx Class'G' 12178' 7003' Perforation Depth MD (ft): 11710'-11770' Perforation Depth TVD (ft): 6774'-6803' Hydraulic Fracture planned? Yes❑ No ❑Q 20. Attachments: Property PlatBOP Sketch ❑ Drilling Program Time v. Depth Plot Shallow Hazard Analysis 8✓ Diverter Sketch e Seabed Report ❑ Drilling Fluid Program 8✓ 20 AAC 25.050 requirements 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be �) deviated from without prior written approval. Contact Name: Ryan McLaughlin Ac Authorized Name: .lamer6hllhger �'- /¢%J1:.�/L Contact Email: an.1T1C10U hlin 00 .0001 Authorized Title: Staff CTD Engineer Contact Phone: 907-265-6218 o Authorized Signature: Date: 9—'" — Commission Use Only Permit to Drill Cp�API Number: �l <'—1 Number: 50-0,---7iz-71 �-6� --�� Permit Approval �•r Date: 2 1 ' See cover letter for other requirements. Conditions of approval : If box is checked, well may not be used to exRlore for, test, or produce coalbed methane gas hydrates, or gas contained in shales: 1Q Other .BOP *C�Sf P rISwYG fD 35-001 5 'J . Samples req'd: Yes ❑,/�.10� Mud log req'd: Yes ,❑,/.No� 7gnr1 v! ar�!'� ✓rn fC� �� l� < Jrv61 / 5 ii$ measures: Yes Lrj No❑ Directional svy req'd: Yes Ly No El 4 I/tG/ i a�7cc i s �9ry tri 7 Spacing exception rreq'd: Yes ElNo L --J/ Inclination -only svy mcl'd: Yes ❑ No1_1�0/ 9 c me Ah o0 Post initial injection MIT req 'd: Yes❑ Nog of Phis VVeW APPROVED Approved by: COMMISSIONER THEHECOMMISSION Date: 1 v� 9 ,�-h4t iptyevised 5/2017 Fhi pefmit is valid for 41 f a Submit Form and proval per 20 AAC 25.005(9) Attachments in Duplicate ./-0r%L:/YJ ConocoPhillips Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 September 17, 2019 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill three laterals out of the KRU 1 R-23 (PTD# 191-101) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin on October 1st, 2019. The objective will be to drill three laterals — 1R- 231-1 and 1 R -23L1-01 will be unlined delineation laterals to the north and east, crosscutting through the A3 and C1 sands. 1 R-231-1-02 will be drilled to the north targeting the C1 sands and lined with 2-3/8" solid and slotted liner from TD up into the tubing tail To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of being limited to 500' from the original point. Attached to this application are the following documents: - Permit to Drill Application Forms (10401) for 1R-231-1, 1R-231-1-01, & 1R-231-1-02 - Detailed Summary of Operations - Directional Plans for 1R-231-1, 1R-231-1-01, & 1R-231-1-02 - Current wellbore schematic - Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-265-6218. Sincerely, Ryan McL in Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Lateral 1 R-231-1, 1 R-231-1-01, & 1 R-231-1-02 Application for Permit to Drill Document 1. Well Name and Classification........................................................................................................ 2 (Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))...................................................................................................................2 2. Location Summary .......................................................................................................................... 2 (Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................... _...... ... 3. Blowout Prevention Equipment Information................................................................................. 2 (Requirements of 20 AAC 25.005(c)(3))................................................................................................................................................. 2 4. Drilling Hazards Information and Reservoir Pressure.................................................................. 2 (Requirements of 20 AAC 25.005(c)(4))...............................................................................................................-................................2 S. Procedure for Conducting Formation Integrity tests................................................................... 2 (Requirements of 20 AAC 25.005(c)(5))..................................................................................................................................................2 6. Casing and Cementing Program....................................................................................................3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 7. Diverter System Information.......................................................................................................... 3 (Requirements of 20 AAC 25.005(c)(7))..................................................................................................................................................3 8. Drilling Fluids Program.................................................................................................................. 3 (Requirements of 20 AAC 25.005(c)(6))..................................................................................................................................................3 9. Abnormally Pressured Formation Information.............................................................................4 (Requirements of 20 AAC 25.005(c)(9))..................................................................................................................................................4 10. Seismic Analysis.............................................................................................................................4 (Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................4 11. Seabed Condition Analysis............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11))................................................................................................................................................4 12. Evidence of Bonding......................................................................................................................4 (Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................4 13. Proposed Drilling Program.............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................4 Summaryof Operations...................................................................................................................................................4 LinerRunning...................................................................................................................................................................5 14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6 (Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................6 15. Directional Plans for Intentionally Deviated Wells....................................................................... 6 (Requirements of 20 AAC 25.050(b))...................................................................................................................................................... 6 16. Attachments....................................................................................................................................6 Attachment 1: Directional Plans for 1R-23, 1R-231-1-01, & 1R-231-1-02.........................................................................6 Attachment 2: Current Well Schematic for 1 R-23, 1 R-231-1-01, & 1R-231-1-02...............................................................6 Attachment 3: Proposed Well Schematic for 1R-23, 1R-231-1-01, & 1 R-23L1-02...........................................................6 Page 1 of 6 September 16, 2019 PTD ADDlication: 1R -23L1, 1R-231-1-01, &1R-231-1-02 Well Name and Classification (Requirements of 20 AAC 25.005(o and 20 AAC 25.005(b)) t✓i The proposed laterals described in this document are 1R-23, 1 R -23L1-01, & 1R-231-1-02. The laterals will be classified as "Development - Oil" wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the C1 and A3 sand packages in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of 1R-23, 1R-231-1-01, & 1R-231-1-02. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the maximum formation pressure in the area of 3517 psi in 1 R-23 (i.e. 10.0 ppg EMW), the maximum potential surface pressure in 1 R-23, assuming a gas gradient of 0.1 psi/ft, would be 2841 psi See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 1R-23 was measured to be 3517 psi (10.0 ppg EMW) on 12/20/2010. The maximum downhole pressure in the 1 R-23 vicinity is the 1 R-23 at 3517 psi or 10.0 ppg EMW on 12/20/2010_ Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) i No specific gas zones will be drilled; gas injection has been performed in this area, so there is a chance of encountering gas while drilling the 1 R-23 laterals. If gas is detected in the returns the contaminated mud canbe diverted to a storage tank away from the rig. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 1 R-23 laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 1 R -23L1, 1 R-231-1-01, & 1 R-231-1-02 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 September 16, 2019 PTD Application: 11R-231_1, 1R -23L1-01, & 1R -23L1-02 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details Btm MD MD MD TVDSS TVDSS Conductor 16" 62.5 H-40 Welded Surface Delineation lateral —will be unlined ' 1R -23L1 - N/A N/A N/A N/A with an anchored billet set at 14,100' 36.0 J-55 BTC Surface 6331' MD 4072' 3520 2020 Production 7" Delineation lateral — will be unlined 1 R-231_1-01 N/A N/A N/A N/A with an anchored billet set at 12,500' 4980 4320 Tubing 3-1/2" 9.3 MD EUEABMOD Surface 11,610 Surface 6727' 2-3/8", 4.7#, L-80, ST -L slotted/solid 1R -23L1-02 11,605' 17,700' 6636' 6739' liner, with oil and water tracer pups, and sealbore deployment sleeve Existina Casin&Liner Information Category OD Weight Grade Connection Top MD Btm MD Top TVD Btm ND Bu64s Collapse Conductor 16" 62.5 H-40 Welded Surface 123' Surface 123' 10 670 Surface 9-5/8" 36.0 J-55 BTC Surface 6331' Surface 4072' 3520 2020 Production 7" 26.0 L-80 NSCC Surface 12,178' Surface 7003' 4980 4320 Tubing 3-1/2" 9.3 J-55 EUEABMOD Surface 11,610 Surface 6727' 8430 7500 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(6)) Diagram of Drilling System , A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Water based Power-Vis�milling fluid (8.6 ppg) — Drilling operations: Water based PowerVis mud (8.6 ppg). This mud weight may not hydrostatically overbalance the reservoir pressure; overbalanced conditions will be maintained using MPD practices described below. — Completion operations: BHA's will be deployed using standard pressure deployments and the well will be loaded with a weighted completion fluid in order to provide formation over -balance and maintain wellbore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 -psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". 11 In the IR -23 laterals we will target a constant BHP of 11.8 EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased Page 3 of 6 September 16, 2019 PTD Application. 1R-231_1, 1R -23L1-01, & 1R-231_1-02 reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Pressure at the 1R-23 Window 111,680' MD. 6760' TVD) Using MPD 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 1 R-23 is an injector equipped with 3-1/2" tubing and 7" production casing. In preparation for CTD operations on this well, the XN nipple will have to be milled out and a high expansion wedge will be set pre -rig. CDR3-AC will mill a 2.80" window in the production casing at a depth of 11,680' MD. After that, the 1 R-231_1 delineation lateral will be drilled to the north and crosscut through the C1 and A3 sands to determine rock quality and oil -water contact in both sand packages. A anchored billet will be set and the 1R-231-1-01 lateral will be drilled to the east, crosscutting through the C1 and A3 sands to determine rock quality and OWC in the eastern fault block. Finally, an anchored billet will beset and the IR -231-11-02 lateral will be drilled to the north, targeting the C1 sands, and lined with 2-3/8" slotted liner to the tubing tail. / i�h/; po✓ t� Pre -CTD Work H 1. RU Slickline: Dummy whipstock drift, SBHP 2. RU E -line: Caliper 3. RU CTU: Mill D -Nipple Page 4 of 6 September 16, 2019 Pumps On 1.8 bpm) Pumps Off Formation Pressure 10.0 3515 psi 3515 psi Mud Hydrostatic 8.6 3023 psi 3023 psi Annular friction (i.e. ECD, 0.080psi/ft) 934 psi 0 psi Mud + ECD Combined no chokepressure) 3957 psi , Overbalanced -442psi) 3023 psi Underbalanced -492psi) Target BHP at Window 11.8 4148 psi 4148 psi Choke Pressure Required to Maintain Target BHP 191 psi 1125 psi 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background KRU well 1 R-23 is an injector equipped with 3-1/2" tubing and 7" production casing. In preparation for CTD operations on this well, the XN nipple will have to be milled out and a high expansion wedge will be set pre -rig. CDR3-AC will mill a 2.80" window in the production casing at a depth of 11,680' MD. After that, the 1 R-231_1 delineation lateral will be drilled to the north and crosscut through the C1 and A3 sands to determine rock quality and oil -water contact in both sand packages. A anchored billet will be set and the 1R-231-1-01 lateral will be drilled to the east, crosscutting through the C1 and A3 sands to determine rock quality and OWC in the eastern fault block. Finally, an anchored billet will beset and the IR -231-11-02 lateral will be drilled to the north, targeting the C1 sands, and lined with 2-3/8" slotted liner to the tubing tail. / i�h/; po✓ t� Pre -CTD Work H 1. RU Slickline: Dummy whipstock drift, SBHP 2. RU E -line: Caliper 3. RU CTU: Mill D -Nipple Page 4 of 6 September 16, 2019 PTD Application: 1R-231_1, 1R -23L1-01, & 1R-231_1-02 4. RU E -Line: Set High Expansion Wedge Rise Work 1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1116" BOPE, test. 2. 1 R-231_1 Lateral (Delineation Lateral A/C Sands - North) a. Mill 2.80" window at 11,680' MD ' b. Drill 3" bi-center lateral to TD of 14,975' MD , c. Set anchored aluminum billet at 14,100' MD 3. IR -231-1-01 Lateral (Delineation Lateral A/C Sands -East) a. Kickoff of the aluminum billet at 14,100' MD b. Drill 3" bi-center lateral to TD of 16,520' MD c. Set anchored aluminum billet at 12,500' MD 4. 1R-231-1-02 Lateral (Cl Sand — North) a. Kickoff of the aluminum billet at 12,500' MD b. Drill 3" bi-center lateral to a TD of 17,000' MD c. Run 2-318" slotted/blank liner with oil/water tracer pups and seal bore deployment sleeve from TD up to 11,595' MD 5. Freeze protect, ND BOPE, and RDMO Nabors CDR3-AC rig. Post -Rig Work 1. RU E -Line: Set LTP 2. Return well to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the swab valve on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using the swab valve on the Christmas tree, deployment ram on the BOP, check valve and ball valve in the BHA, and a slick -line lubricator. This pressure control equipment listed ensures reservoir pressure is contained during the deployment process. During BHA deployment, the following steps are observed. — Initially the swab valve on the tree is closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. — Pressure is applied to the lubricator to equalize across the swab valve. The swab valve is opened and the BHA is lowered in place via slick -line. — When the BHA is spaced out properly, the deployment ram is closed on the BHA to isolate reservoir pressure via the annulus. A closed ball valve and check valve isolate reservoir pressure internal to the BHA. Slips on the deployment ram prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment ram. — The coiled tubing is made up to the BHA with the ball valve in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the ball valve is opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment ram is opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running — The 1 R-231-1, 1 R-231_1-01, & 1 R-231_1-02 laterals will be displaced to an overbalancing fluid prior to running liner. See "Drilling Fluids" section for more details. Page 5 of 6 September 16, 2019 PTD Application: 1R-231-1, 1R -23L1-01, & 1R-231-1-02 - While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. ° • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1R-18 or 16 disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(6)) - The Applicant is the only affected owner. - Please see Attachment 1: Directional Plans - Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. - MWD directional and gamma ray will be run over the entire open hole section. - Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 11R-231-11 4790' " 1 R -23L1-01 3041' 1R -23L1-02 2541' Distance to Nearest Well within Pool Lateral Name Distance Well 111-231-11 2918' 1 R-35 1111-231-11-011 2918' 1 R-35 1111-231-11-02 2810' 1 R-35 16. Attachments Attachment 1: Directional Plans for the 1R -23L1, 1R -23L1-01, & 1R-23L1-02laterals Attachment 2: Current Well Schematic for IR -23 Attachment 3: Proposed CTD Well Schematic for the 1R -23L1, 1R -23L1-01, & 1R -23L 1-02 laterals Page 6 of 6 September 16, 2019 ConocoPhillips x.num.m Trtv xonn WELLBORE DETAILS: IR -23L1 Project: Kuparuk River Unit _2MUM�NN Nwm'31 See: Kuparuk IR Pad rac M.MpNc nYtl Parent Wellbore: lR-23 Well: 1R•21 s�roin. sre acea Te on MD: 11600.00 Wellbore: 1R -23L1 nie Plan: 1R-23L1_wp02(1R-231IR•23LI) uo4N: apoum,e Comfireb MI RdI: VleM iR-23, Tor NVN V¢Nkel (MI) Rtlnav: 1823 ® 38.00eft 11 n2N seem Net Rne'erx»'. 311 (MN. Omit UGHES Meaewe3DegM1Rahreme'. 1142 08 DDcA(1110) aGEranpaM CekJaEm M1bI Me.. C.Me O 9DUW b + 84001 t p 9800 720D- 66001 20D- btiO 1 O L7 6000 14011 1801 M, IM -11 .' ♦ � � __ � —rte I:YS/IR-� r• 1 ue -1 la.n Z / 1800 12 -1200 -600 0 600 1300 1800 2400 1000 36U0 4200 4800 5400 6000 6600 7200 9800 8400 9000 9600 10200 10900 11400 13000 12,,00 13200 13800 14400 15000 15600 16_00 16800 1740U 18000 16600 1R_1,)1rs-1,- West( -)/East(+) (600 usft/in) 1R-23 @ 88.00usX (iR-23) ConocoPhillips ConocoPhillips Alaska Inc—Kuparuk Kuparuk River Unit Kuparuk 1R Pad 1 R-23 1 R-231-1 Plan: 1 R-231-1_wp02 Standard Planning Report 11 September, 2019 BA UGHES a GE company ConocoPhillipsBA ER ConocoPhillips Planning Report UGHES a GEcompany Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_Kuparuk Project: Kuparuk River Umt_2 Site: Kuparuk 1 R Pad Well: 1 R-23 Wellbore: 1R-231-1 Design: 1R-23L1_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well iR-23 Mean Sea Level iR-23 @ 88.00usft (IR -23) True ' Minimum Curvature Project Kupamk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Site Kuparuk 1R Pad 1R-23 Site Position: Northing: 5,991,050.01 usft Latitude: 70° 23' 11.370 N From: Map Easting: 539,829.93 usft Longitude: 149° 40'33.803 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: 0.31 ° Well 1R-23 Well Position +NIS 0.00 usft Northing: 5,991,630.1g usft Latitude: 70° 23' 17.076 N Field Strength +E/.W 0.00 usft Easting: 539,829.67 usft Longitude: 149' 40'33.721 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 1R-23LI Magnetics Model Name Sample Date Declination Dip Angle Field Strength BGGM2018 11/1/2019 16.37 80.88 57,403 Design 1R-23L1_wP02 Audit Notes: Version: Phase: PLAN Tie On Depth: 11,600.00 Vertical Section: Depth From (TVD) +NIS +E/.W Direction (usft) (usft) (usft) (°) 0.00 0.00 0.00 45.00 Plan Sections - Measured TVD Below Dogleg Build Turn Depth Inclination Azimuth System +NI -S +EAW Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°1100usft) (°1100usft) ('1100usft) (°) Target 11,600.00 61.91 45.26 6,633.88 5,511.92 6.868.29 0.00 0.00 0.00 0.00 11,680.00 61.67 44.96 6,671.69 5,561.67 6,918.23 0.45 -0.30 -0.37 -132.30 11,709.00 66.89 44.96 6,684.28 5,580.15 6,936.69 18.00 18.00 0.00 0.00 11,755.91 88.00 44.96 6,694.42 5,612.37 6,968.86 45.00 45.00 0.00 0.00 12,000.00 88.09 62.06 6,702.81 5,756.91 7,164.25 7.00 0.04 7.00 90.00 12,250.00 90.57 44.73 6,705.75 5,905.41 7,364.14 7.00 0.99 -6.93 -82.00 12,650.00 91.45 16.74 6,698.56 6,245.75 7,566.52 7.00 0.22 -7.00 -88.00 12,950.00 100.40 35.86 6,667.34 6,511.91 7,697.60 7.00 2.99 6.37 64.00 13,300.00 88.81 14.17 6,638.94 6,825.85 7,843.47 7.00 -3.31 -6.20 -117.00 13,575.00 90.52 33.34 6,640.58 7,076.36 7,953.72 7.00 0.62 6.97 85.00 13,850.00 84.96 14.89 6,651.51 7,325.95 8,065.54 7.00 -2.02 -6.71 -107.00 14,050.00 85.11 28.94 6,668.91 7,510.33 8,139.72 7.00 0.08 7.03 90.00 14,175.00 85.17 20.16 6,679.52 7,623.51 8,191.42 7.00 0.05 -7.03 -90.00 14,575.00 66.10 358.87 6,779.39 8,000.94 8,257.82 7.00 4.77 -5.32 -135.00 14,975.00 64.96 350.17 6,945.36 8,362.88 8,223.21 2.00 -0.29 -2.18 -100.00 9/11/2019 11 11:47AM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Planning Report UGHES Wa RTany Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc Kupamk Project: Kupamk River Unit_2 Site: Kupaluk 1 R Pad Well: 1R-23 Wellbore: 1R -23L1 Design: IR-23L1wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1 R-23 Mean Sea Level 1 R-23 @ 88.00usft (1 R-23) True Minimum Curvature Planned Survey Measured TVD Below Vertical Dogleg Tcolface Map Map Depth (usft) Inclination (°) Azimuth 0 System (usft) +N/ -S (usft) +EI -W (usft) Section (usft) Rate (°1100usft) Azimuth (°I Northing (usft) Easting (usft) 11600.00 61.91 4526 6,633.88 5,511.92 6,868.29 8,754.13 0.00 0.00 5,997,178.07 546,667.83 TIP 11,680.00 61.67 44.96 6,671.69 5,561.67 6,918.23 8,824.62 0.45 -132.30 5,997,228.08 546,717.50 KOP 11,700.00 65.27 44.96 6,680.63 5,574.33 6,930.87 8,842.51 18.00 0.00 5,997,240.81 546,730.08 11,709.00 66.89 44.96 6,684.28 5,580.15 6,936.69 8,850.74 18.00 0.00 5,997,246.66 546,735.86 Start Build 45.00 11,755.91 88.00 44.96 6,694.42 5,612.37 6,968.86 8,896.27 45.00 0.00 5,997,279.04 546,767.85 Start DLS 7.00 TFO 90.00 11,800.00 88.00 48.05 6,695.95 5,642.69 7,000.82 8,940.31 7.00 90.00 5,997,309.54 546,799.65 11,900.00 88.03 55.05 6,699.42 5,704.80 7,079.04 9,039.54 7.00 89.89 5,997,372.05 546,877.53 12,000.00 88.09 62.06 6,702.81 5,756.91 7,164.25 9,136.64 7.00 89.65 5,997,424.61 546,962.45 Start DLS 7.00 TFO 52.00 12,100.00 89.07 55.12 6,705.29 5,808.98 7,249.51 9,233.75 7.00 -82.00 5,997,477.12 547,047.43 12,200.00 90.07 48.20 6,706.03 5,670.97 7,327.90 9,333.01 7.00 -81.83 5,997,539.53 547,125.48 12,250.00 90.57 44.73 6,705.75 5,905.41 7,364.14 9,382.98 7.00 -81.78 5,997,574.15 547,161.53 Start DLS 7.00 TFO -88.00 12,300.00 90.69 41.23 6,705.20 5,941.98 7,398.22 9,432.94 7.00 -88.00 5,997,610.90 547,195.41 12,400.00 90.93 34.24 6,703.78 6,021.00 7,459.37 9,532.07 7.00 -88.04 5,997,690.24 547,256.14 12,500.00 91.15 27.24 6,701.96 6,106.89 7,510.45 9,628.91 7.00 -88.14 5,997,776.39 547,306.75 12,600.00 91.35 20.24 6,699.78 6,198.35 7,550.67 9,722.02 7.00 -88.26 5,997,868.06 547,346.48 12,650.00 91.45 16.74 6,698.56 6,245.75 7,566.52 9,766.75 7.00 -88.42 5,997,915.53 547,362.07 Start DLS 7.00 TFO 64.00 12,700.00 92.98 19.89 6,696.63 6,293.17 7,582.21 9,811.38 7.00 64.00 5,997,963.03 547,377.52 12,800.00 96.01 26.22 6,688.79 6,384.85 7,621.22 9,903.76 7.00 64.12 5,998,054.91 547,416.03 12,900.00 98.97 32.62 6,675.75 6,471.16 7,669.87 9,999.22 7.00 64.62 5,998,141.47 547,464.22 12,950.00 100.40 35.86 6,667.34 6,511,91 7,697.60 10,047.63 7.00 65.45 5,998,182.36 547,491.72 Start DLS 7.00 TFO -117.00 13,000.00 98.80 32.70 6,658.99 8,552.64 7,725.35 10,096.06 7.00 -117.00 5,998,223.23 547,519.26 13,100.00 95.52 26.47 6,646.52 6,638.87 7,774.29 10,191.65 7.00 -117.53 5,998,309.72 547,567.73 13,200.00 92.18 20.30 6,639.80 6,730.40 7,813.86 10,284.34 7.00 -118.30 5,998,401.45 547,606.81 13,300.00 88.81 14.17 6,638.94 6,825.85 7,843.47 10,372.77 7.00 -118.72 5,998,497.04 547,635.90 Start DLS 7.00 TFO 86.00 13,400.00 89.42 21.14 6,640.49 6,921.07 7,873.77 10,461.53 7.00 85.00 5,998,592.41 547,665.70 13,500.00 90.05 28.11 6,640.95 7,011.91 7,915.41 10,555.21 7.00 84.89 5,998,683.47 547,706.85 13,575.00 90.52 33.34 6,640.58 7,076.36 7,953.72 10,627.87 7.00 84.86 5,998,748.12 547,744.81 Start DLS 7.00 TFO -107.00 13,600.00 90.01 31.67 6,640.46 7,097.45 7,967.15 10,652.28 7.00 -107.00 5,998,769.27 547,758.13 13,700.00 87.96 24.97 6,642.24 7,185.41 8,014.56 10,748.00 7.00 -107.01 5,998,857.47 547,805.06 13,800.00 85.95 18.26 6,647.55 7,278.18 8,051.32 10,839.60 7.00 -106.89 5,998,950.44 547,841.33 13,850.00 84.96 14.89 6,651.51 7,325.95 8,065.54 10,883.43 7.00 -106.53 5,998,998.27 547,855.29 Start DLS 7.00 TFO 90.00 13,900.00 84.97 18.40 6,655.90 7,373.66 8,079.80 10,927.25 7.00 90.00 5,999,046.05 547,869.30 14,000.00 85.05 25.43 6,664.62 7,466.02 8,116.96 11,018.84 7.00 89.69 5,999,138.60 547,905.96 14,050.00 85.11 28.94 6,668.91 7,510.33 8,139.72 11,066.26 7.00 89.08 5,999,183.03 547,928.48 Start OLS 7.00 TFO 50.00 14,100.00 85.12 25.43 6,673.17 7,554.64 8,162.48 11,113.68 7.00 -90.00 5,999,227.45 547,950.99 14,175.00 85.17 20.16 6,679.52 7,623.51 8,191.42 11,182.84 7.00 -89.70 5,999,296.47 547,979.57 Start DLS 7.00 TFO -136.00 14,200.00 83.93 18.92 6,681.89 7,646.96 8,199.74 11,205.31 7.00 -135.00 5,999,319.96 547,987.76 14,300.00 79.02 13.87 6,696.72 7,741.77 8,227.66 11,292.09 7.00 -134.88 5,999,414.91 548,015.18 14,400.00 74.20 8.65 6,719.89 7,837.10 8,246.69 11,372.96 7.00 -134.13 5,999,510.33 548,033.69 9/11/2019 11:11:47AM Page 3 COMPASS 5000.14 Build 85H �. ConocoPhillips BA ER ConocoPhillips Planning Report BAT .GE. ,, Database: EDT 14 Alaska Production Company: ConcooPhillips Alaska Inc_Kupamk Project: Kupamk River Unit 2 Site: Kupamk 1R Pad Well: 1 R-23 Wellbore: 1 R-23LI Design: 1R-2311_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 1 R-23 Mean Sea Level 1R-23 @ 88.00usft(1 R-23) True Minimum Curvature Planned Survey Local Coordinates Depth -NI-S Measured Vertical Casing Hole Depth Depth Diameter Measured (usft) (usft) Name TVD Below (in) 14,97500 Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System -NIS +E/ -W Section Rate Azimuth Northing Easting (usft) V) (') (usft) (usft) (usft) (usft) (°1100usft) (°1 (usft) (usft) 14,500.00 69.50 3.19 6,751.05 7,931.54 8,256.54 11,446.71 7.00 -132.92 5999,60482 548,043.04 14,575.00 66.10 358.87 6,779.39 8,000.94 8,257.82 11,496.68 7.00 -131.22 5,999,674.21 548,043.95 Start DLS 2.00 TFO -100.00 14,600.00 66.01 358.33 6,789.54 8,023.78 8,257.26 11,512.44 2.00 -100.00 5,999,697.05 548,043.27 14,700.00 65.69 356.17 6,830.46 8,114.92 8,252.89 11,573.78 2.00 -99.78 5,999,788.15 548,038.41 14,800.00 65.39 353.99 6,871.86 8,205.60 8,245.08 11,632.39 2.00 -98.90 5,999,878.78 548,030.12 14,900.00 65.13 351.81 6,913.71 8,295.72 8,233.86 11,686.18 2.00 -98.00 5,999,968.83 548,018.43 14,975.00 64.96 350.17 6,945.36 8,362.88 8,223.21 11,728.14 2.00 -97.08 6,000,035.92 548,007.42 Planned TO at 14975.00 Casing Points Local Coordinates Depth -NI-S Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 14,97500 6.945.36 2-3/8" 2.375 3.000 lien Annotations Measured Depth (usft) 11,600.00 11,680.00 11,709.00 11,755.91 12,000.00 12,250.00 12,650.00 12,950.00 13,300.00 13,575.00 13,850.00 14,050.00 14,175.00 14,575.00 14,975.00 Vertical Local Coordinates Depth -NI-S +EI -W (usft) (usft) (usft) 6,633.88 5,511.92 6,868.29 6,671.69 5,561.67 6,918.23 6,684.28 5,580.15 6,938.69 6,694.42 5,612.37 6,968.86 6,702.81 5,756.91 7,164.25 6,705.75 5,905.41 7,364.14 6,698.56 6,245.75 7,566.52 6,667.34 6,511.91 7,697.60 6,638.94 6,825.85 7,843.47 6,640.58 7,076.36 7,953.72 6,651.51 7,325.95 8,065.54 6,668.91 7,510.33 8,139.72 6,679.52 7,623.51 8,191.42 6,779.39 8,000.94 8,257.82 6,945.36 8,362.88 8,223.21 Comment TIP KOP Start Build 45.00 Start DLS 7.00 TFO 90.00 Start DLS 7.00 TFO -82.00 Start DLS 7.00 TFO -88.00 Start DLS 7.00 TFO 64.00 Start DLS 7.00 TFO -117.00 Start DLS 7.00 TFO 85.00 Start DLS 7.00 TFO -107.00 Start DLS 7.00 TFO 90.00 Start DLS 7.00 TFO -90.00 Start DLS 7.00 TFO -135.00 Start DLS 2.00 TFO -100.00 Planned TO at 14975.00 9/11/2019 11 11 47A Page 4 COMPASS 5000.14 Build 85H ConocoPhillips BA ER ConocoPhillips Anticoljision Report BAT aGEcompany Company: ConocoPhillips Alaska lno_Kupamk Project: Kuparuk River Unit 2 Reference Site: Kuparuk 1R Pad Site Error: 0.00 usft Reference Well: 1 R-23 Well Error: 0.00 usft Reference Wellbore 1R -23L7 Reference Design: 1R-231-1_wp02 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 1R-23 1 R-23 @ 88.00usft (IR -23) IR -23 @ 88.00usft (IR -23) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Reference 1R-231-1wpO2 Filter type: GLOBAL FILTER APPLIED. All wellpaths within 200'+ 100/1000 of reference Reference Interpolation Method: MD Interval 25.00usft Error Model: ISCWSA Depth Range: 11,600.00 to 14,975.00usft Scan Method: Tray. Cylinder North Results Limited by: Maximum ellipse separation of 3,000.00 usft Error Surface: Combined Pedal Curve Warning Levels Evaluated at: 2.79 Sigma Casing Method: Added to Error Values Suryey Tool Program Date 913=19 From To (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 11,600.0018-23(1 R-23) GCT -MS Schlumberger GCT multishot 11,600.00 14,975.00 1R-23L1_wp02(1R-231-1) MWD OWSG OWSG MWD -Standard Summary Kuparuk I Pad- iR-23-1R-23-1R-23 Reference Offset Distance Measured Measured Between Between Separation Warning Site Name Depth Depth Centres Ellipses Factor Offset Well - Wellbore - Design (usft) (usft) (usftl (usft) Distance Kuparuk 1R Pad Measured Vertlwl Measured Vertical 1R -23 -1R -23-1R-23 11,625.00 11,625.00 0.00 -314.61 0.000 STOP Drilling, CC, SF 1R -23 -1R -23-1R-23 11,675.00 11,675.00 0.00 -315.80 0.000 STOP Drilling, ES 1 R-23 - 1 R-23 - 1 R-23 11,900.00 11,925.00 92.87 87.73 18.046 CC, ES, SF 1R-23- 1R-231-1-01 - 1R-231-1-01_wp03 14,406.63 14,425.00 69.01 62.39 10.428 CC, ES, SF 1 R-23 - IR -231-1-02 - 1 R-231-1-02 12,824.78 12,825.00 18.56 18.20 51.314 CC 1R -23 -1R -231 -1 -02 -IR -231-1-02 12,848.67 12,850.00 19.87 17.96 10.401 ES 1R -23 -1R -231-1-02-1R-231-1-02 14,337.72 14,325.00 78.31 44.12 2.290 Caution Monitor Closely, SF 1 R-35 - 1 R-35 - 1 R-35 0.00 -0.98 0.98 0.000 STOP Drilling Out of range 1 R-35 - 1 R-35 - 1 R-35 11.62567 6.73366 159.90 160.11 Out of range 1 R-35 - 1 R-35 - 1 R-35 TD Projection 6,88393 0.00 -31461 314.61 Out of range 1 R-35 - 1 R-35 - 1 R-35 TD Projection 6.745.40 11,61 6.745,40 11.62 Out of range Offset Design Kuparuk I Pad- iR-23-1R-23-1R-23 Me she son" 0.90 raft Survey Program: 100-GCT-Mfi Oasetwell Error. 0.00 Wit Reference Want Seal Major Asia Distance Measured Vertlwl Measured Vertical Resonance Onset Azimuth Waal wellbore Centre Uttep n Schanon 611nlroum Separation blaming Depth Depth Depth Depth from NOM rN/S rEl-w centre, Ellipses 3epa2ao0 Factor Ivam (usty) (usft) loam Ilan) loon) 1°I luaft) (.it) lung (mm lien) 11,62500 6,733.66 11,62500 6,733.66 0.31 043 136.36 5,527.45 6.88393 0.00 -0.98 0.98 0.000 STOP Drilling 11625.00 6733.66 11.62567 6.73366 159.90 160.11 138.36 5,527.45 6,88393 0.00 -31461 314.61 0.000 STOP Drilling, CO, SF 11,650.00 6.745.40 11,61 6.745,40 11.62 0.06 136.30 5,543.00 609955 0.00 -1.71 1.71 0.001 STOP Drilling 11.650.00 6,745.48 1165090 6.745.48 160.12 160.54 136130 5,543.00 600955 0100 -31521 315.21 0.000 STOP Drilling 11,675.00 6,757,32 11,67500 6,757.32 0.93 1.29 136.24 5,558.56 6915.12 0.00 -2.44 245 0.001 STOP Drilling 11.675.00 6,757.32 11,675.00 6,757.32 160.34 160.97 136.24 5,558.55 6.915.12 0.00 -315.80 315.80 0.000 STOP Drilling. Es 11699.97 6.780.62 11,700.00 6,769.19 1.00 1.72 -131.36 5,574.13 6,930.65 0.64 -1.50 2.14 0.298 STOP Drilling 11.699.97 6.760.62 11,700,00 6,789.19 160,39 161.39 -131.36 5,574.13 6,930.88 0.84 -239.13 239.76 0.003 STOP Drilling 11.724.42 6,777.45 11,725.00 6,781.14 1.01 2.15 -13138 5,589.70 6918.15 364 1.38 247 1.557 Ce ipn Monitor Closely 11,72442 6)77.45 11,725.00 6,781.14 16740 161.82 -134.36 5,569.]0 6.946.15 3.84 -22].6] 231,52 0.017 STOP Drilling 11,746.90 6781.78 11,750.00 6,793.22 1.02 2.58 -134.51 5.601 6.961.56 11.50 8]6 273 4.219 11,74690 6,781.78 11,750.00 6793.22 160.42 162.25 434.51 5.601 6.961.58 11.50 -203.79 215.29 0.053 STOP Ori 11,768.32 6.782.85 11,75.00 6.805.42 1,04 301 -133,48 5.620.73 6.976.94 22.59 19,58 3,01 7,514 11,768.32 8.782.85 11,75.W 8,805.42 190.44 182.67 -133,48 5,1 6,976.94 22,59 481.58 207,15 0109 STOP Drilling 11,790.46 8,783.62 11,800.00 6817.74 1.06 344 -130.98 5636.19 699233 34.16 30.81 3.35 10.195 11,79046 6.783.62 11,800.00 6,81].]4 160.47 163.10 -130.98 5.636.19 8,992.23 34.16 -173.45 207.61 0.165 STOP Drilling CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 9/3/2019 2.13:21PM Page 2 COMPASS 5000.14 Build 85H Conoco4iillips Project: Kupmuk River Unit_2 Site: Kuparuk IR Pad Ar...T-. laentie. lea M•v+la Fka WELLBORE DETAILS: IR -231-1 REFERENCE INFORMATION Parent 11-23 CoarmwalwEl Reare"a. VIA 1R-23. True Norm Well: IR -23 eberyN: siaxan-neonVmeal MD. 11600.00 MID (NDI Re Mato, Akan sea Wellbore: 1R-231-7 as•s.mo�Ms) Cate. oaoEl N O Plan: iR-23L1_vry02 (tR-2311 R-231-1) 11" rate. itNRJt Mmes eooM-mI a�6(IR'2J) Eaw..:'R-23 88 µyyyrM hpA WMerce: I ilj' M 7700 raturn eelmkem Menne: Mxmum Oumskre WELL DETAILS: 1R-23 +NI -S +E/ -W NorthiN Easting Latitude Longitude 0.00 0.00 5991630.19 539629.67 70' 23' 17.076 N 149° 40'33.721 W See MD Inc Azi eg TFace VS A Annotation 1 11600.00 61.91 45.26 6633.88 5511.92 6868.29 0.00 0.00 8754. 3 TIP 2 11680.00 61.67 44.96 6671.69 5561.67 6918.23 0.45 -132.30 8824. 2 KOP 3 11709.00 66.89 44.96 6684.28 5580.15 6936.69 18.00 0.00 8850. 4 Start Build 45.00 4 11755.91 88.00 44.96 6694.42 5612.37 6968.86 45.00 0.00 8896. 7 Stan DLS 7.00 TFO 90 00 5 12000.00 88.09 62.06 6702.81 5756.91 7164.25 7.00 90.00 9136. 4 Start DLS 7.00 TF0 -8 .01 6 12250.00 90.57 44.73 6705.75 5905.41 7364.14 7.00 -82.00 9382. 8 Start DLS 7.00 TFO -8 .01 7 12650 00 91.45 16.74 6698.56 6245.75 7566.52 7.00 -88.00 9766. 5 Start DLS 7.00 TFO 00 8 12950.00 100.40 35.86 6667.34 6511.91 7697.60 7.00 64.00 10047. 3 Start DLS 7.00 TFO -1 7.1 9 13300.00 88.81 14.17 6638.94 6825.85 7843.47 7.00 -117.00 10372. 7 Start DLS 7.00 TFO 85 00 10 13575.00 90.52 33.34 6640.58 7076.36 7953.72 7.00 85.00 10627. 7 Start DLS 7.00 TFO -1 71 11 13850.00 84.96 14.89 6651.51 7325.95 8065.54 7.00 -107.00 10883.3 Start DLS 7.00 TFO 90 00 12 14050.00 85.11 28.94 6668.91 7510.33 8139.72 7.00 90.00 11066.6 Start DLS 7.00 TFO -9 .01 13 14175.00 85.17 20.16 6679.52 7623.51 8191.42 7.00 -90.00 11182. 4 Start DLS 7.00 TFO -1 5.1 14 14575.00 66.10 358.87 6779.39 8000.94 8257.82 7.00 -135.00 11496. 8 Start DLS 2.00 TFO -110'1 15 14975.00 64.96 350.17 6945.36 8362.88 8223.21 2.00 -100.00 11728. 4 Planned TD at 14975. 0 Mean S ER I U SES 8750 c 8400 i- IR --'T I TIO Pl Died TDeI 11497500 IR JS'l It ,< IR 211.1{01 Farlt3 Ik 31 Iroa IR aJ/IR- LI OI� r. ;. 3 SOSU C S DIS200 T10 10000 h IR _3L1_T08 ilj' M 7700 .. + I IR-23LI Fault .._ 73501 IR-23LI T07 Surt OLS ]OtI TFO -135.00 O , IR -23L] D6 _ DOW _T06 __ IR-13LI TOS _ SYgrt DIS].00'T£0-9000 .: IR 'LI T04---- Start DtS]OD TF09DD0 i 6650 - - IR -333 1-1 T03-' �Srurt DLS700500 SStartDIS 7000 TfrO TFO 85 6300 _ -L IR -210 IR 2:1-1 Fault -" -"'- _ San DLS200TF0-11 00 - IR -23 CTD POI,,- F 1. nl, SIen DLS ].00 TFO 6400 5950- - - - IR -23 LI TO IR -23L1 -T01 Stan DLS 700'1 FO -88.00 5600 Stan B Id 4500KOP"'Stan 8100 -- 1 DLS700TFO 5250 ... �3 Q'TDR ,on -L _{ TIP' �Wcst(-)/East(+) (350 usft/in) Vertical Section at 45.00° (100 usft/in) ✓ KUP INJ 1R-23 ConoleoPhillipS Weli Attributes Max Angle&MD TD Aa4I81fID WollboreAPIIIIWI Force Name Wellbore Blalus 11"', 5062fl2229999 KUPARUK RIVER UNIT INJ clMO kK81 %IDIm111K01 6510 3,00000 12,180-0 Cammenl JH351ppml OM Annotation Eno Odle SSSV: TRW` OnW0: 1/6/1992 KB�Grtl 1X1 flip Releau usesIftm.lumrols3:H<I 42.99 tOT11991 PM noUlion DepIh IM1NB1 EnO Dale noYtion Lasi By 17 Dale Last Tag'. SLM 11,(1 884015 Rev Reason'. PULLED FRAC SLEEVE IeXallf 12/304016 Gazing Strings Oast, .emotion ooltnl mllnl 1"(191 BemeplhlnKin Sel Depth IN01...ohuln(._Gratle Top Th. CONDUCTOR 16 15.062 44.0 123.0 123.0 62.50 Hi0 WELDED WVM'EB''E9d Casing Oesorienon ODlInl ID IIn1 ToplaKel -cei WrI633I Bet Depth ll072* Wtllen ll...Grade TOP ThreM SURFACE 95/8 8921 42.0 6,3308 3600- BTC Casing Description OOlin1 )Olin Top IHK2 BelOepthlkKO) "'"TIh IND .. WVLen 11... GMe Top TMeatl I" vi, PRODUCTION ] 6.2]6 292 II.TJZ] ],002.5 26.00 1-80 NSCC Tubing Strings Turn.Description String Me.. lODn1 Top lune) Bel Depth lX..sel Depth TVD)t... wlpelX vraEa Topeonnecbon TUBING WO 314 2.992 383 11,609.9 6]26.] 930 J-55 EUEABMOD Completion Details Nominal ID Top (final Top OVD)INKe1 Top Incl(') Ibm one Com lint CONOUCTDR: d461Z3B 38.3 310 0.01 HANGER FMC GENIV TUBIN HANGER 3.500 1,8160 1.i 3909 SAFETY VLV CAMCO TRDP-1A SAFETY VALVE 2.812 11529.9 6,6890 61.87 NIPPLE OTIS x SELECTIVE LANDING NIPPLE 2.813 11,567.5 6,706.7 61.89 PER BAKER PBR 3.000 11,581.2 6,713.1 61.90 PACKER BAKER He RETRIEVABLE PACKER 2.890 sA£ETr Wv+e+Bn 11577-5 6,72. 1. 1 NIPPLE OTIS RN NIPPLE NO GO 2750 11,609.2 6726.3 61.88 SOS BAKER SHEAR OUT SUB 2.992 Perforations & Slots Shot Dens DKLIF[ApAJ Tap IXKeI BM(Been TapINDI (IIKRI BIm IN01 e1Ke) Zone IshobH Odle tI Type Cam 11,]10.0 11,JJ0.0 6,]]4.1 6,803.1 C-2.0-1, too"92 10.0 IPERF 4.5" Cog Gun', NO degp6 UNITS, 1R 3 Stimulations & Treatments Top MDo Blm Ceplll OepM De Top (TV BIm INOI 'NiIn 1111 kXBI Type OaM Lam 11710.0 11,770.D 6774.1 6,8W.1 "ED ID/11/1he PUMP 12,G69N OF 20140 SANG AND 2,490p OF 5 ROCKSALT. INITIAL ISIP 27M PSI, FINALISIP 14 PSI. Man4lral Inserts n Mi B O0.FALE420E.33]B on N Tap IRKBI ioPiKER 1flKBI MeU MM01 OD(p) OnesView Type ILenthn"I Type Port ln(Run Ipso RunDoneCom 3,250] 2,d93.2 CAMCO KBUG- 1GAS SIV LIFT OMY BK 0.0 0.000 6010/])1992 M 2 11 484 .1 6667.5 0IS JLBD 11/2 1 GAS LIFT I DMV RM 0.000 0.0 4/1/1992 Notes: General & Safety EndDme Anra.bon GA6. UFT: 11.dG.5 10/192010 NOTE. View Schematic w/ Alaska Schemallc9.0 /19/2013 NOTE PROD CSG RKB per RIG DETAIL SHEET NIPPIE: 1151.9 PPCKEX', 11,5613 NIPPLE: 11,59].4 IDE, II B]9.3 XPBD, I1.]t0.p 1 IPE0.F. 11 ]10R11,1N0 E PROp1 N0N:M21i,IP] 16" 62# H-40 shoe @123'MD 9-5/8" 36# J-55 shoe @ 6331' MD KOP @ 11,680' MD via 7" HEW FC sand perfs 11,710' - 11,770' MD 7.126# L-80 shoe @ 12,178' MD 1 R-23 Proposed CTD Schematic - 3-1/2 Cameo TRDP-1A SSSV at 1816' MD 3-1/2" 9.3# J-55 EUE 8rd Tubing to surface 3-1/2" Cameo gas lift mandrel at 3251' 3-1/2" OTIS gas lift mandrel at 11,485' OTIS X Selective landing nipple @ 11,530' MD (2.813" ID) Baker 3-1/2" PBR at 11,568' MD Baker HB packer at 11,581' MD (2.89" ID) OTIS XN-nipple at 11,598' MD (2.75" min ID, No -Go) 3-1/2" SOS at 11,609' MD 1R -23L1-02 Wp02 TD @ 17,000' MD Top of Liner Q 11605' MD IR43L1-01 Wp03 TD � 16,520' MD Oil & Weler T/acerro Pups OH -Anchor &Ilei @ 12,500' MD 1R -23L1 Wp02 TD ®14,975' MD OH -Anchor Billet @ 14.100' MD Loepp, Victoria T (CED) From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Sent: Thursday, September 26, 2019 8:54 AM To: Loepp, Victoria T (CED) Cc: Ohlinger, James J; Knock, Grace E Subject: RE: [EXTERNAL]KRU 1R-231-1, 1R-231-1-01, 1 R-231-1 -02(PTD 219-128, 219-129, 219-130) Hello Victoria, We are planning on running blank liner from 11,605' MD to 13,850' MD which will straddle the anchored billet and block off any production from the first two delineation laterals. The blank liner is expected to block off flow from the first two laterals, abandoning them without cement. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Thursday, September 26, 2019 8:14 AM To: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Subject: [EXTERNAL]KRU 1R-231-1, 1R-231-1-01, 1R-23L1-02(PTD 219-128, 219-129, 219-130) Ryan, For the two delineation laterals that are unlined, will they be produced or abandoned without cement? How long is the blank portion of the 11R-231-1-02? Will this blank liner prevent any flow from the other two laterals? Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria.Loeoo(a)alaska.aov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loeoo@alaska.gov Davies, Stephen F (CED) From: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Sent: Monday, September 16, 2019 11:18 AM To: Davies, Stephen F (CED) Subject: RE: [EXTERNAL]KRU 1R-23 (PTD 191-101; Sundry 319-421) - Question Steve, That is correct. The high expansion wedge is non -isolating. Regards, Ryan McLaughlin Coiled Tubing Drilling Engineer ConocoPhillips Alaska Office: 907-265-6218 Cell: 907-444-7886 700 G St, ATO 670, Anchorage, AK 99501 From: Davies, Stephen F (CED) <steve.davies@alaska.gov> Sent: Monday, September 16, 2019 11:16 AM To: McLaughlin, Ryan <Ryan.McLaughlin@conocophillips.com> Subject: [EXTERNAL]KRU 1R-23 (PTD 191-101; Sundry 319-421) - Question Ryan, Could you please confirm that the proposed High Expansion Wedge will not isolate the existing C -sand perforations in KRU 1R-23? Thank you, Steve Davies AOGCC CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of theintendedrecipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Steve Davies at 907-793-1224 or steve.daviest@alaska.gov. TRANSMITTAL LETTER CHECKLIST WELL NAME: / �� I)C- 2 L L I PTD: Zl —G Zb Development _ Service Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: lea cuc itrt ✓ POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI LATERAL The permit is for a new wellbore segment of existing well Permit No. q - j,�>API No. (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- _-_) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are fust caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. hi addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL -490100 Well Name: KUPARUK RIV UNIT 1R-231.1 Program pEV Well bore seg PTD#:2191280 Company ConocoPhillios Alaska Inc Initial Class/Type DEV / PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached ........ . . . . . . .... . . . . . . . .... . _ .... _ _ NA 2 Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ .. _ _ Yes _ _ _ _ Lateral well branch with KOP, top prod interval, and TD in ADL 025627. 3 Unique well. name and number - - _ - - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 4 Well located in a defined pool _ _ _ . _ - - Yes _ .. _ Kuparuk River Oil Pool, govemed by Conservation Order No. 432D 5 Well located proper distance from drilling unit boundary_ _ _ _ _ _ _ _ _ _ _ _ _ _ ______ Yes _ _ . Conservation Order No. 432D has no interwell- spacing -restrictions, Wellbore will be more than 500' _ 6 Well located proper distance from other wells _ _ _ _ _ Yes _ _ from an external property line whereownership or landownership. changes. As proposed,. well branch 7 Sufficient acreage available in drilling unit- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes _ _ will conform to spacing requirements. 8 Jf deviated, is. wellbore plat included - - - - - - _ - - _ _ - - - _ - - _ . _ Yes 9 Operator only affected party. - - - - - - ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ______ _ _ Yes 10 Operator has appropriate bond in force _ _ ... _ _ _ .. _ _ Yes _ 11 Permit can be issued without conservation order. _ _ _ _ _ _ Yes Appr Date 12 Permitcan be issued without administrative approval _ _ _ _ _ _ _ .. Yes SFO 9/23/2019 13 Can permit be approved before 15 -day wait_ _ _ _ _ _ _ _ Yes _ 14 Well located within area and strata authorized by. Injection Order # (put. 10# incomments)(For- NA 15 All wells within 114 -mile area of review identified (For service well only)_ __ _ _ _ _ _ _ _ _ NA 16 Pre -produced injector; duration of pre production less than 3 months. (For service well only) NA___ _ _ _ _ _ _ _ _ _ _ 17 18 Nonconven, gas conforms to AS31,08 030([.1.A),([.2.A-D) _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ _ __ Conductor stringprovided__...... _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ NA... NA- _ - - .... Conductor set.for-KRU_ 1R-23. Engineering 19 Surface casing. protects all known USDWs _ _ _ _ _ ... _ ... _ ... NA _ _ _ _ _ . Surface casing set for KRU IRr23. 20 CMT. vol adequate to circulate on conductor _& surf_csg . . . . . . ..... . . ...... . NA_ _ _ . _ _ .. Surface casing set and fully cemented 21 CMT -vol adequate to tie-in long string to surf csg. _ _ _ _ .. . . . . .. . .... . NA 22 CMT -will cover all known productive horizons_ _ _ _ _ _ _ _ _________ _ __ _ __ _ _ _ _ _ No..... _ _ _ Productiveintervalwill not be completed; unlined delineation lateral; will be abandoned 23 Casing designs adequate for CJ. B j& permafrost _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes 24 Adequate tankage. or reserve pit _ _ _ _ _ _ _ _ _ ... _ Yes _ _ Rig has steel tanks; all. waste to approved disposal wells.. 25 If are -drill, has a 10-403 for abandonment been approved _ _ _ _ _ _ _ -. _ _ . NA_ 26 Adequate wellbore separation proposed _ _ _ _ _ _ _ _ _ _ .... _ ..... Yes _ _ Anti -collision analysis complete; no major risk failures 27 If.diverter required, does it meet regulations _ _ _ _ _ _ _ _ _ _ _ _ _ NA - - - Appr Date 28 Drilling fluid program schematic & equip list adequate_ _ ... ... _ _ _ Yes . _ Max formation pressure is 3515 prig(10 ppg EMW); will drill w/ 8.6.ppg EMW and maintain overbolw/ MPD- VTL 9/24/2019 29 J30PEs, do they meet regulation _ _ _ _ _ .... . . . ... . . . Yes - - - 30 BOPE-press rating appropriate; test to -(put prig in comments)_ ___ _ _ _ _ _ _ _ _ _ _ Yes . _ _ _ MPSP is 2841 -prig; will test BQPs to 3500 prig... 31 Choke manifold complies w/API RP -53 (May 84)- - _ ..... _ _ _ ... _ Yes 32 Work will occur without operation shutdown- - - - - - - - - - - - - - - - - - --- - - - - - - -- Yes 33 Jr, presence of H2S gas. probable- - - - - - - - - -- - - - - - - - - - - - - - - - - _ _ . - _ - - Yes ... _ _ H2S measures required, 34 Mechanical condition of wells within AOR verified (For. service well only) _ _ _ _ _ _ ..... _ NA 35 Permit can be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ ___ ___ _ _ _ ___ _ No.. _ Wells on.1 R -Pad are H2,S-bearing. H2S measures required. Geology 36 Data presented on potential overpressure zones .. _ _ ... ... .. _ . Yes _ _ _ Expected reservoir pressure is 10.0 ppg, with soml potential of higher pressure due togas Appr Date 37 Seismic analysisi of shallow gas zones _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ injection within this area. Well branch will. be drilled using 8.6 ppg mud, a coiled -tubing dg, and SFD 9/23/2019 38 Seabed condition survey -(if off -shore) ........ . . . . . . . .... . . ... .. . . NA .. _ _ _ _ managed pressure drilling technique to control formation pressures and. stabilize shale sections. by... 39 Contact namelphone for weekly_ progress reports [exploratory only], _ _ _ _ _ _ _ _ _ _ _ _ _ NA _ _ _ _ maintaining a constant pressure gradient of about 11.8. ppg EMW... Geologic Engineering Public Date: Date Date Commissioner: Commissioner: Commissioner