Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-159DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20084-60-00Well Name/No. KUPARUK RIV UNIT 3H-01AL1Completion Status1-OILCompletion Date1/5/2020Permit to Drill2191590Operator ConocoPhillips Alaska, Inc.MD11643TVD5975Current Status1-OIL4/1/2020UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR/RESNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScale0 0 2191590 KUPARUK RIV UNIT 3H-01AL1 LOG HEADERS31935LogLog Header ScansC1/17/2020 Electronic File: 3H-01AL1 EOW - NAD27.pdf31935EDDigital DataC1/17/2020 Electronic File: 3H-01AL1 EOW - NAD27.txt31935EDDigital DataC1/17/2020 Electronic File: 3H-01AL1 EOW NAD83.pdf31935EDDigital DataC1/17/2020 Electronic File: 3H-01AL1 EOW NAD83.txt31935EDDigital DataC1/17/2020 Electronic File: 3H-01AL1PB1 EOW - NAD27.pdf31936EDDigital DataC1/17/2020 Electronic File: 3H-01AL1PB1 EOW - NAD27.txt31936EDDigital DataC1/17/2020 Electronic File: 3H-01AL1PB1 EOW NAD83.pdf31936EDDigital DataC1/17/2020 Electronic File: 3H-01AL1PB1 EOW NAD83.txt31936EDDigital Data0 0 2191590 KUPARUK RIV UNIT 3H-01AL1 PB1 LOG HEADERS31936LogLog Header ScansC1/23/20207588 11643 Electronic Data Set, Filename: 3H-01AL1 GAMMA RES.las31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 2MD Final Log.cgm31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 5MD Final Log.cgm31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 5TVDSS Final Log.cgm31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 2MD Final Log.pdf31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 5MD Final Log.pdf31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 5TVDSS Final Log.pdf31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 EOW - NAD27.pdf31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 EOW - NAD27.txt31951EDDigital DataWednesday, April 1, 2020AOGCCPage 1 of 4PB1~H-01AL1GAMMA RES.las33H DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20084-60-00Well Name/No. KUPARUK RIV UNIT 3H-01AL1Completion Status1-OILCompletion Date1/5/2020Permit to Drill2191590Operator ConocoPhillips Alaska, Inc.MD11643TVD5975Current Status1-OIL4/1/2020UICNoC1/23/2020 Electronic File: 3H-01AL1 Final Surveys TD at 11643 ft.csv31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 Final Surveys TD at 11643 ft.xlsx31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 Survey Listing.txt31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 Surveys.txt31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1_25_tapescan_BHI_CTK.txt31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1_5_tapescan_BHI_CTK.txt31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1_output.tap31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 2MD Final Log.tif31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 5MD Final Log.tif31951EDDigital DataC1/23/2020 Electronic File: 3H-01AL1 5TVDSS Final Log.tif31951EDDigital Data0 0 2191590 KUPARUK RIV UNIT 3H-01AL1 LOG HEADERS31951LogLog Header Scans0 0 2191590 KUPARUK RIV UNIT 3H-01AL1 PB1 LOG HEADERS31952LogLog Header ScansC1/23/20207588 10961 Electronic Data Set, Filename: 3H-01AL1PB1 GAMMA RES.las31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 2MD Final Log.cgm31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 5MD Final Log.cgm31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 5TVDSS Final Log.cgm31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 2MD Final Log.pdf31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 5MD Final Log.pdf31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 5TVDSS Final Log.pdf31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 EOW - NAD27.pdf31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 EOW - NAD27.txt31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 Final surveys TD 10961.csv31952EDDigital DataWednesday, April 1, 2020AOGCCPage 2 of 43H-01AL1PB1GAMMA RES.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20084-60-00Well Name/No. KUPARUK RIV UNIT 3H-01AL1Completion Status1-OILCompletion Date1/5/2020Permit to Drill2191590Operator ConocoPhillips Alaska, Inc.MD11643TVD5975Current Status1-OIL4/1/2020UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYMud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:1/5/2020Release Date:11/22/2019C1/23/2020 Electronic File: 3H-01AL1PB1 Final surveys TD 10961.xlsx31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 Survey Listing.txt31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 Surveys.txt31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1_25_tapescan_BHI_CTK.txt31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1_5_tapescan_BHI_CTK.txt31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1_output.tap31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 2MD Final Log.tif31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 5MD Final Log.tif31952EDDigital DataC1/23/2020 Electronic File: 3H-01AL1PB1 5TVDSS Final Log.tif31952EDDigital DataWednesday, April 1, 2020AOGCCPage 3 of 4 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20084-60-00Well Name/No. KUPARUK RIV UNIT 3H-01AL1Completion Status1-OILCompletion Date1/5/2020Permit to Drill2191590Operator ConocoPhillips Alaska, Inc.MD11643TVD5975Current Status1-OIL4/1/2020UICNoComments:Compliance Reviewed By:Date:Wednesday, April 1, 2020AOGCCPage 4 of 4M. Guhl4/1/2020 rft al � �� STATE OF ALASKA FEB _ Zfl2� ALASKA OIL AND GAS CONSERVATION COMMISSION 1a. Well StatuWE; LL COMPLETION SPLUG OR rR❑ECOnMPL❑ETION REPORT AND LOG Suspended❑ 1b. Well Class: 20AAC 25.105 20AAC 25.110 Development Q Exploratory ❑ GINJ ❑ WINJ ❑ WAG❑ WDSPL ❑ No. of Completions: Service ❑ Stratigraphic Test ❑ 2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number/ Sundry: ConocoPhillips Alaska, Inc. Aband.: 1/5/2020 219-159 ' 3. Address: 7. Date Spudded: 15. API Number: P.O. Box 100360 Anchorage, AK 99510-0360 12/27/2019 50-103-20084-60-00 4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number: Surface: 1546' FNL, 281' FWL, Sec 12, T12N, R8E, UM 1/2/2020 KRU*3H-01AL1/KRU 3H-01AL1PB1 Top of Productive Interval: i W:*J 9. Ref Elevations: KB:76 17. Field / Pool(s): 812' FNL, 878' FEL, Sec 12N, R8E, UM GL:39 BF: Kuparuk River Field/Kuparuk River Oil Pool Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation: 2953' FNL, 55' FEL, Sec 11, T1 2N, R8E, UM 8397/5935ADL 255474ADL 25531• 4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number: Surface: x- 498655 y- 6000111 Zone- 4 11643/5975 931886000, 931882000 TPI: x- 497499 y- 5995566 Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD: Total Depth: x- 498320 y- 5998704 Zone- 4 N/A 1764/1637 5. Directional or Inclination Survey: Yes Q (attached) No ❑ 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD: Submit electronic and printed information per 20 AAC 25.050 N/A (ft MSL) N/A 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT FT. TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 16 62.5 H 40 36 115 36 115 24 245 sx AS 1 9 5/8 36 J-55 35 3577 35 2942 12 1/4 1300sx AS III, 400sx CLASS G, 7 36 J-55 33 8076 33 6155 81/2 300sx Class G, 200sx AS 1 2 3/8 4.6 L-80 7565 11638 5765 15975 13 SLOTTED LINER 24. Open to production or injection? Yes Q No ❑ 25. TUBING RECORD If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation SIZE DEPTH SET (MD) PACKER SET (MD/TVD) Size and Number; Date Perfd): SLOTTED LINER @: 31/2 7614 7095/5415 7565-11638 MD and 5765-5975 TVD COMPLETION 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 7543/5748 DAT15 Was hydraulic fracturing used during completion? Yes ❑ No Q / 0Zv Per 20 AAC 25.283 (i)(2) attach electronic and printed information V RAED DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: Method of Operation (Flowing, gas lift, etc.): 1/16/2020 GAS LIFT Date of Test: Hours Tested: Production for Oil -Bbl: Gas -MCF: Water -Bbl: Choke Size: Gas -Oil Ratio: 1/17/2020 5hrs Test Period 526 280 269 4 645 Flow Tubing Casinq Press: Calculated Oil -Bbl: Gas -MCF: Water -Bbl: Oil Gravitv - API (corr): Press. 194 1210 24 -Hour Rate 2325 1500 1277 Nov Form 10-407 Revised 5/2017 CONTINUED ON P G 2 ubmit ORIGINIAL only /��� �jo RBDMS�'"' FEB 0 4102QS 128. CORE DATA Conventional Core(s): Yes ❑ No ❑ Sidewall Cores: Yes 1 No F,-/1 Form 10-407 Revised 5/2017 Submit ORIGINAL Only If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No Q If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1764 1637 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 8392 5934 information, including reports, per 20 AAC 25.071. Formation @ TPI -Kuparuk A 3H-01AL1PB1 TD 10961 5968 0-1-1 �/ opairo6 A' Formation at total depth: 11643 5974 31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, oaleontological regort, groduction or well test results. r 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: James Ohlin er Contact Name: James Haves Authorized Title: Staff CTD Engineer Contact Email: James. C.Ha es co p.com Authorized 40 J.*140 Oh �•��.. Contact Phone: 265-6927 Signature: Date: V/,* 0 4 r-11 101p, INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1 a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1 b: Well Class - Service wells: Gas Injection, Water Injection, Water -Alternating -Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY -123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only 16" 62# H-40 shoe (- 115' MD 9-5/8" 36# J-55 shoe @ 3577' MD Liner Top Packer K P 7763' MD C4 -sand perfs 7684'-7752' MD A -sand perfs 7758' - 7840' MD 7" 26# J-55 shoe @ 8076' MD 3H-01 Final Schematic 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Cameo MMG gas lift mandrels @ 2936', 4637', 5910'. 6517'. & 7009' RKB Baker 3-1/2" PBR 7072' MD (4" ID) Baker FHL Packer @ 7095' MD (2.93" ID) 3-1/i' DS landing nipple at 7485' MD (2.813" ID) Baker Poor Boy Overshot @ 7506' RKB Baker 3-1/2" PBR 7530' MD (3" ID) Baker FHL packer @ 7543' MD (2.937" ID) Camco D -Nipple @ 7581' MD (Milled2.80" Min ID) Camco SOS @ 7614" MD 3H-01AL1 TD 11,637' MD PBR 7,565' MD 3H-01APB1 TD 10,961' MD Top of Billet @ 9640' MD Swell Packer 3H -01A 7,834' MD TD 11,303' MD Top of Billet @ 8397' MD ConocoPhillips ldP,k.7. ItX: KUP PROD WELLNAME 31-1-01 WELLBORE 3H-01AL1 Well Attributes Max Angle & MD JTD Field Name Wellbore APUUWI Wellbore Status I cl (°) MD (ftKB) Act Btm (ftKB) 3H-01AL1 1jennalt 8.22 8,236.29 11,648.0 Comment H2S (ppm) Date Annotation Eno Data KEI rd (ft) Rig Release Date 175 4/30/2016 Last WO: I I 4201. 1/5/2020 3H-01AL7, 127/101012:07:08 PM Last Tag Vertical schematic (—I) Annotation Depth (ftKB) End Date Wellbore Last Mod By ............................................................................................ Last Tag: 3H-01AL1 1jennalt HANGER; 31.0 Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: CTD LATERAL 1112212020 31-1-01AL1 1jennalt Casing Strings Casing Description OD (in) m (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... WULen (I... Grade Top Thread AL1 LINER (CTD) 2 3/8 1.99 7,564.7 11,637.7 5,974.9 4.70 L-80 CONDUCTOR3401'15.D Annular Fluid. Diesel; 33.0. Liner Details 2.500.0; 1/4t= Nominal ID Top (ftKB) Top (TVD) (ftKB) To Incl (°) Item Des Com (in) 7,564.7 5,764.7 41.00 DEPLOYMENT Deployment Sleeve w/6' Sealbore Receptical (PBR) 2.375 SLEEVE w/6' SEALBORE RECEPTICAL (PBR) GAS LIFT; 2,935.6 7,834.2 5,961.5 60.87 SWELL Swell Packer - Halliburton 1.686 PACKER SURFACE; 35.0-3,576.7 Annular Fluid - Seavater, 45.0-L— 7,854.5 5,970.2 68.07 DEPLOYMENT SLEEVE Shorty Deployment Sleeve 1.920 7,no.o; v4rzozo 9,442.2 5,933.6 90.53 DEPLOYMENT Shorty Deployment Sleeve 1.920 GAS LIFT; 4,636.9 SLEEVE 10,657.9 5,985.1 89.21 DEPLOYMENT Shorty Deployment Sleeve 1.920 SLEEVE GAS LIFT; 5,900.9 Notes: General & Safety End Date I Annotation 1/22/2020 NOTE: VIEW SCHEMATIC w/Alaska Schematic 10.0 GAS LIFT; 6,516 6 GAS LIFT; 7,008.7 LOCATOR; 7,065.0 SEAL ASSY; 7,066.0 PBR; 7,072.2 PACKER; 7,095.2 NIPPLE; 7,485.4 OVERSHOT; 7,501.1 PBR; 7,529.5 PACKER; 7,543.3 Norther Solutions LTP; 7,560D TUBING PUNCH; 7,565.0 NIPPLE; 7,581.3 SOS; 7,613.8 (PERF; 7,712.0.7,716.0 RPERF; 7,684.0.7,752.0 (PERF; 7,722.0.7,730.0 APER F; 7,758.0.7,770.0 Whipstock; 7,762.0 PRODUCTION; 33.0.8,076.4 A LINER (CTD); 8,397.2- 11,303.0 r AL1 LINER (CTD); 7,564.7- 11,6377 KUP PROD WELLNAME 31-1-01 WELLBORE 3H-01 Conoco Well Attributes Max Angle & MD TD Field Name Wellbore APIIUWI Wellbore Status cl (°) MD (ftKB) Act Btm Ajaska, nc 8.55 3,900.60 8,167.0 NONE 1175 14/30/2016 11-ast WO: 14/11/2015 31-1-01, 1IZ7r202012:09.38 PM Last Tag Vertical sch-tie (actual) Annotation Depth (ftKB) 1 End Date Wellbore Last Mod By _................................................................................... Last Tag: RKB 7,764.0 11/9/2019 3H-01 condijw HANGER; 31 0 Last Rev Reason Annotation End Date Wellbore Last Mod By Rev Reason: Set NSLTP 1111012020 31-1-01 Izeal Casing Strings Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... W111 -en (I... Grade Top Thread CONDUCTOR 16 15.06 36.0 115.0 115.0 62.50 H-40 WELDED Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (ND)... WtMn (I... Grade Top Thread CONDUCTOR; 38.0-1150 SURFACE 95/8 8.92 35.0 3,576.7 2,942.4 36.00 J-55 BTC Annular Fluid - Diesel; 33.6 2,5170.0; 1/4/1020 Casing Description OD (in) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... WtlLen PRODUCTION 7 6.28 33.0 8,076.4 6,155.4 26.00 (I... Grade Top Thread J-55 BTC Tubing Strings Tubing Description Set String Ma... ID (in) Top (ftKB) Set Depth (ft.. Depth (TVD) (... Wt (Ibtft) Grade Top Connection TUBING -2015 WO 31/2 2.99 31.0 7,509.7 5,723.3 9.30 L-80 EUE8rdABMOD Completion Details Top (TVD) Top Incl Nominal GAS LIFT; 2,935.6 Top (ftKB) (ftKB) V Item Des Com ID (in) 31.0 31.0 0.67 HANGER FMC TUBING HANGER 2.992 7,065.0 5,392.6 42.61 LOCATOR LOCATOR 2.990 7,066.0 5,393.3 42.60 SEAL ASSY BAKER 8040 SEAL ASSEMBLY 3.000 SURFACE; 35.0-3,576.7 Annular Fluid - seawater; 45.0-L- 7,072.2 5,397.9 42.56 PBR BAKER 8040 PBR 4.000 7,770.0; 1/4/202(1 7,095.2 5,414.8 42.40 PACKER BAKER FHL RETRIEVABLE PACKER 47132 2.930 GAS LIFT; 4,6368 7,485.4 5,705.0 41.40 NIPPLE DS NIPPLE 2.813 7,503.1 1 5,718.3 41.30 JOVERSHOT IBAKER POOR BOY OVERSHOT 3.750 Tubing Description String Ma... ID (in) Top (ftKB) Set Depth (ft.. Set Depth (TVD) (... Wt (Ibnt) Gratle Top Connection TUBING - ORIGINAL 3 1/2 2.99 7,504.7 7,614.6 5,802.4 9.30 J-55 EUE8rdABMOD GAS LIFT; 5,900.9 Completion Details Top(TVD) Top Incl Nominal Top (ftKB) (ftKB) V Item Des Co. ID (in) 7,529.5 5,738.2 41.17 PBR BAKER PBR 3.000 7,543.3 5,748.5 41.10 PACKER BAKER'FHL' PACKER 2.937 GAS LIFT; 6,516.6 7,581.3 5,777.2 40.91 NIPPLE CAMCO'D' NIPPLE NO GO 2.800 -*( MILL D NIPPLE TO 2.80" )"""'"" 7,613.8 5,801.8 40.80 SOS CAMCO SHEAROUT SUB 2.937 Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.) GAS LIFT; 7,008.7 Top (TVD) Top Incl Top (ftKB) (ftKB) (°) Des Com Run Date ID (in) 7,560.0 5,761.1 41.02 Norther 2.72" Northern Solutions Liner Top Packer w/ 1.781 R- 1/10/2020 1.781 Solutions LTP Nipple (8.29' OAL) LOCATOR; 7,065.0 7,565.0 5,764.9 41.00 TUBING TUBING PUNCH, 4 FT INTERVAL, 4 SPF, 16 SHOTS 11/10/201 2.992 SEAL ASSY; 7,11%.0 PER; 7,072.2 PUNCH TOTAL 9 PACKER; 7,095.2 7,762.0 5,914.4 39.97 Whipstock 3.5" MB XL Whipstock w/OHA 0/201 9 Perforations & Slots Shot Dae NIPPLE; 7,485.4 Top (TVD) Btm (TVD) (shotslft Top (ftKB) Btm (ftKB) (ftKB) (ftKB) Linked Zone Date ) Type Com 7,684.0 7,752.0 5,855.0 5,906.8 UNIT D, C4 C- 8/21/1988 12.0 RPERF 21/8" EnerJet; 60 deg. ph 3, 3H-01 OVERSHOT; 7,503.1 7,712.0 7,716.0 5,876.2 5,879.3 C4,31-1-011 12/3/1987 2.0 IPERF 4" Densi Jet; 120 deg. ph 7,722.0 7,730.0 5,883.8 5,889.9 C4,31-1-011 12/3/1987 2.0 IPERF 4" Densi Jet; 120 deg. ph PBR; 7,529.5 PACKER; 7,543.3 7,758.0 7,770.0 5,911.4 5,920.6 A-3, 3H-01 8/21/1988 8.0 APERF 21/8" EnerJet; 60 de h 9' p 7,782.0 7,800.0 5,929.8 5,943.6 A-2,31-1-01 8/21/1988 8.0 APERF 21/8" EnerJet; 60 deg. ph Norther solutions LTP; 7,560.0 7,822.0 7,840.0 5,960.4 5,974.2 A-1, 3H-01 5/21/1988 8.0 APERF 2.5" Scallop; 90 deg. ph 7,860.0 10,659.0 5,989.5 A2, A3, 3H-01 1/4/2020 SLOTS Slotted Liner 3H -01A TUBING PUNCH; 7,565.0 9,442.6 11,637.0 A2, A3,31-1-011 1/4/2020 SLOTS Slotted Liner 3H -01L1 Mandrel Inserts NIPPLE, 7,581.3 at ab SOS; 7,613.8 on Top (TVD) ValveLatch port Size N Top (ftKB) (ftKB) Make Model OD (in) Be, Type Type (in) TRO Run (psi) Run Date Co. 1 2,935.6 2,505.5 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 11235.0 4/24/2015 2 4,636.9 3,657.9 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.158 1,238.0 4/24/2015 3 5,900.9 4,552.4 CAMCO MMG 1 1/2 GAS LIFT OV RK 0.250 0.0 4/24/2015 4 6,516.6 4,996.6 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.0001 0.0 4/17/2015 (PERF; 7,712.0-7,716.0 5 7,008.7 5,351.3 1 CAMCO IMMG 1 1 1/2 GAS LIFT DMY RK 0.000 r 0.0 4/24/2015 DCR RPERF; 7,684.0-7,752.0 Notes: General & Safety (PERF; 7,722.0-7,730.0 End Date Annotation 1/22/2020 NOTE: VIEW SCHEMATIC w/Alaska Schematic 10.0 7/7/2001 NOTE: WAVERED WELL- IA X OA COMMUNICATION AL1 LINER (CTD); 7,564.7- 1,637.7 APERF; 7,758.0-7,770.01 Whipstock; 7,762.0 APERF; 7,782.0-7,800.0�. APERF; 7,822.0-7,840.0 PRODUCTION; 33.0-8,076.4 SLOTS; 9,442.6-11,6370 SLOTS; 7,8611.0-10,659.0N 6" 62# H-40 hoe @ 115' MD 9-5/8" 36# J-55 shoe @ 3577' MD Liner Top Packer 3H-01 Proposed CTD Schematic 3-1/2" 9.3# L-80 EUE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels @ 2936', 46371, 5910', 6517', & 7009' RKB Baker 3-1/2" PBR 7072' MD (4" ID) Baker FHL Packer @ 7095' MD (2.93" ID) 3-'/2' DS landing nipple at 7485' MD (2.813" ID) Baker Poor Boy Overshot @ 7506' RKB Baker 3-1/2" PBR 7530' MD (3" ID) Baker FHL packer @ 7543' MD (2.937" ID) Camco D -Nipple @ 7581' MD (2.75" Min ID) Camco SOS @ 7614" MD .., =y a, R' ' 3H-01AL1 TD 11,637' MD PBR 7,565' MD 3H-01 APB 1 TD 10,961' MD Top of Billet @ 5658' MD Proposed KOP @ 7785' MD \ C4 -sand perts 7684'-7752' MD Swell Packer 3H -01A FA sand perts 7,835' MD TD 11,303' MD 17758'- 7840' MD Top of Billet @ 8397' MD 7" 26#shoe @ _ 8076'MD � x i ..'r'.,..y >... Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/29/2019 11/29/201900 EDurr) MIRU MOVE RURD P Prepare rig for move from 2M-21 to 0.0 0.0 12:00 13:00 3H-01 11/29/2019 11/29/2019 1.00 MIRU MOVE DMOB P Trucks on location, continue to RD, 0.0 0.0 13:00 14:00 load shop and halfway house, Crew change, EE long day, TH crew in. PJSM W Peak truckers. 11/29/2019 11/29/2019 0.50 MIRU MOVE DMOB P Walkaround, prep, skarf pad 0.0 0.0 14:00 14:30 11/29/2019 11/29/2019 0.40 MIRU MOVE DMOB P Jackup Utility Module, sow up, pull 0.0 0.0 14:30 14:54 matts 11/29/2019 11/29/2019 0.20 MIRU MOVE DMOB P Pull Pits and spot on pad for exit 0.0 0.0 14:54 15:06 11/29/2019 11/29/2019 0.60 MIRU MOVE DMOB P Jackup Sub Module, sow up, pull 0.0 0.0 15:06 15:42 away from well, spot up on pad for exit, jeep up 11/29/2019 11/29/2019 0.75 MIRU MOVE DMOB P Pickup matts, jeep up Utility Module, 0.0 0.0 15:42 16:27 11/29/2019 11/29/2019 1.00 MIRU MOVE MOB P Begin Move towards 3H -pad @ 2.5 0.0 0.0 16:27 17:27 mph 11/29/2019 11/29/2019 1.00 MIRU MOVE MOB P Hold up on 2B for changeout. 0.0 0.0 17:27 18:27 11/29/2019 11/29/2019 2.50 MIRU MOVE MOB P Continue moving rig 0.0 0.0 18:27 20:57 11/29/2019 11/29/2019 0.30 MIRU MOVE MOB P Holdup at KCS Y, check tires and 0.0 0.0 20:57 21:15 perform walkaround, fuel up loader 11/29/2019 11/29/2019 0.75 MIRU MOVE MOB P Continue moving rig 0.0 0.0 21:15 22:00 11/29/2019 11/29/2019 0.50 MIRU MOVE MOB P Holdup at 10 -pad, Nabors crew 0.0 0.0 22:00 22:30 change, perform walkaround, check tires 11/29/2019 11/30/2019 1.50 MIRU MOVE MOB P Continue moving rig, crossing CPF3 0.0 0.0 22:30 00:00 pad 11/30/2019 11/30/2019 1.90 MIRU MOVE MOB P Move to 3H pad 0.0 0.0 00:00 01:54 11/30/2019 11/30/2019 1.60 MIRU MOVE MOB P Pull jeeps, troble removing the service 0.0 0.0 01:54 03:30 unit jeeps - 30 min, 11/30/2019 11/30/2019 1.00 MIRU MOVE MOB P Sput Sub & mats, remove tree cap, 0.0 0.0 03:30 04:30 Set down. 11/30/2019 11/30/2019 1.00 MIRU MOVE MOB P Spot Pits & mats, set down 0.0 0.0 04:30 05:30 11/30/2019 11/30/2019 2.00 MIRU MOVE RURD P Crew change, PJSM, start working RU 0.0 0.0 05:30 07:30 check list. 11/30/2019 11/30/2019 1.00 MIRU WHDBOP NUND P Set stack , check tree bolts. spot truck 0.0 0.0 07:30 08:30 shop and Halfway house. Highline on location hooking up power, updated AOGCC. 11/30/2019 11/30/2019 2.40 MIRU WHDBOP RURD P Continue to RU, grease crew serviced 0.0 0.0 08:30 10:54 tree. Transfer rig to High line power @ 10:00. take on seawater. Install Tiger tank and hard line. Flood up and shell test to 4000 psi. *** Rig accept @ 10:00 11/30/2019 11/30/2019 0.10 MIRU WHDBOP BOPE T Witness waived by Austin McLeod of 0.0 0.0 10:54 11:00 the AOGCC. Test pressure 250/4000 psi low/high. Test 1.Leaking past Swab 2, call out valve crew to grease, carry on with test 11/30/2019 11/30/2019 0.70 MIRU WHDBOP BOPE T Test 2. Blind/Shear, BOP TV2'Charlie 0.0 0.0 11:00 11:42 1 1 I 4, 5, 8, &12 Fail, Grease vlave Page 1/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/30/2019 11/30/2019 0.20 MIRU WHDBOP BOPE P Retest - Test 2. Blind/Shear, BOP TV2, 0.0 0.0 11:42 11:54 Charlie 4, 5, 8, &12 Pass 11/30/2019 11/30/2019 0.20 MIRU WHDBOP BOPE P Retest Test 1.Swab 2, Pass 0.0 0.0 11:54 12:06 11/30/2019 11/30/2019 0.90 MIRU WHDBOP BOPE P Test 3. BOP TV 1, Charlie 3, 7, & 11 0.0 0.0 12:06 13:00 Test 4. Manual choke D & Super choke C Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 11/30/2019 11/30/2019 0.80 MIRU WHDBOP BOPE T Test 6. Charlie 1, 9, Bravo 5, and 0.0 0.0 13:00 13:48 Tango 1, - F B5 leaking, Grease B5 11/30/2019 11/30/2019 2.10 MIRU WHDBOP BOPE P Install TIW test joint, 0.0 13:48 15:54 Test 7. Lower 2" pipe slip rams, TIW #1, Romeo 1, Bleeder 1 Test 8. Annular BOP Test 9. Upper 2" pipe slip rams, Bravo 6, & 8 Test 10. Bravo 7 - swap out 2" test joint for 2-3/8" Test 11. 2-3/8" pipe slip rams, TIW#2 Tested all gas detectors, pits, cellar, rig floor all functioned properly, Verified flow alarms - PVT 11/30/2019 11/30/2019 1.70 MIRU WHDBOP BOPE T Blow down and swap out Swap out 0.0 0.0 15:54 17:36 B5, re flood in preparation to test B5 11/30/2019 11/30/2019 0.90 MIRU WHDBOP BOPE P Retest Test 6. Bravo 5 Pass, Crew 0.0 0.0 17:36 18:30 change Note: 7.5 hr BOPE Test 11/30/2019 11/30/2019 0.30 MIRU WHDBOP CTOP P check N2 levels, swap to 2" test joint 0.0 0.0 18:30 18:48 Test 12. Draw down accumulator, stabilized starting pressure XXXX psi, time to 200 psi increase 22 sec, full recovery time until pumps shut down 51 sec, N2 bottles - average of 4, 1900 psi. 11/30/2019 11/30/2019 0.60 MIRU WHDBOP CTOP P Stab INJH, reverse circ, test inner reel 0.0 0.0 18:48 19:24 valve and stripper 11/30/2019 11/30/2019 0.30 MIRU WHDBOP CTOP P Blow down testing equipment 0.0 0.0 19:24 19:42 11/30/2019 11/30/2019 0.20 MIRU WHDBOP CTOP P Open up to well, 1,050 WHP, shut 0.0 0.0 19:42 19:54 back in, inspect and change packoffs 11/30/2019 11/30/2019 1.30 MIRU WHDBOP PRTS P Test PDL's and Tiger Tank Line 0.0 0.0 19:54 21:12 11/30/2019 11/30/2019 1.70 SLOT WELLPR PULD P PJSM, PU/MU milling assembly 0.0 62.4 21:12 22:54 11/30/2019 11/30/2019 0.80 SLOT WELLPR PULD T Trouble with obtaining WITS to BHI, 62.4 62.4 22:54 23:42 troubleshoot 11/30/2019 12/1/2019 0.30 SLOT WELLPR TRIP P RIH w/Milling BHA#1, 0.9° ako motor 62.4 305.0 23:42 00:00 and New slick gauge D331 DSM 12/1/2019 12/1/2019 1.30 SLOT WELLPR TRIP P Continue IH with Milling Assembly 305.0 7,400.0 00:00 01:18 BHA#1, pumping 4.0 bpm, 1.0 bpm returns 12/1/2019 12/1/2019 0.50 SLOT WELLPR DLOG P Log formation HRZ (-1.5') 7,400.0 7,416.0 01:18 01:48 12/1/2019 12/1/2019 0.30 SLOT WELLPR TRIP P Continue IH, dry tag TOC @ 7,619', 7,416.0 7,619.0 01:48 02:06 PUW 29 k 12/1/2019 12/1/2019 1.50 SLOT WELLPR DISP P Displace well to Milling Fluid (Power- 7,619.0 7,619.0 02:06 03:36 pro) 12/1/2019 12/1/2019 0.50 SLOT WELLPR MILL P RIH, start milling cement 7,618.4' , 1.9 7,619.0 7,620.0 03:36 04:06 bpm at 4,295 psi, FS diff=483, WHP=70, IA=1006, OA -612 Page 2/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 12/1/2019 12/1/2019 0.30 SLOT WELLPR MILL P Stall motor, PUW 29 k, no=comms 7,620.0 7,620.0 04:06 04:24 with HOT, trouble shoot (good), re- boot software,RIH 12/1/2019 12/1/2019 0.30 SLOT WELLPR MILL P RBIH, stall motor again, PUH and re- 7,620.0 7,621.4 04:24 04:42 start, 1.86 bpm at 4,313 psi, FS diff=510 psi, WHP=70, BHP=3,342, IA= 1006, OA=618 12/1/2019 12/1/2019 2.30 SLOT WELLPR MILL P RBIH, stall motor again, PUH and re- 7,621.4 7,623.6 04:42 07:00 start, 1.86 bpm at 4,313 psi, FS diff=510 psi, WHP=70, BHP=3,342, IA= 1006, OA=618 12 stalls, some cement and metal on the shaker. 12/1/2019 12/1/2019 0.40 SLOT WELLPR DLOG P PUH & tie into the HRZ for a +0.5' 7,623.6 7,419.0 07:00 07:24 correction. 12/1/2019 12/1/2019 0.40 SLOT WELLPR DLOG P Log CCL from 7419 bit depth to 7,419.0 7,624.0 07:24 07:48 bottom 7624' 12/1/2019 12/1/2019 0.70 SLOT WELLPR MILL P Pull back reaming pass @ 180 ROHS, 7,624.0 7,629.5 07:48 08:30 Baker computer locked up, reboot, reset depth. RBIH and drill 5' with TF @ LS, 7624.5'- 7629.5 ROP up to 60 ft/hr 12/1/2019 12/1/2019 2.00 SLOT WELLPR MILL P Roll TF back to 20 ROHS, drill ahead 7,629.5 7,700.0 08:30 10:30 ROP climbed to 120 ft/hr W 0.48 k lbs WOB @ 7652' Stalls, 7657,7659,7660,7666- 657,7659,7660,7666'Drilling Drilling@ 7666'70 ft/hr, 0.2 WOB 12/1/2019 12/1/2019 5.40 SLOT WELLPR MILL P ROP dropped to 10-16 fUhr @ 7700. 7,700.0 7,741.0 10:30 15:54 7705' PU Wt 31 k lbs 7706.3 PU Wt 31 k lbs Good competent consistant cement from 7724' on down. Mill ahead @ 8 ftph W 2.5 k WOB. 12/1/2019 12/1/2019 1.10 SLOT WELLPR MILL P Softer spot w higher ROP to 57 ft/hr 7,741.0 7,759.0 15:54 17:00 CT 4492 psi @ 1.88/1.84 bpm in/out, OBD diff 784 psi, CT Wt 11.8 k lbs, WOB 1.5 k lbs, WH 5 psi, IA 1041 psi, OA 778 psi. 12/1/2019 12/1/2019 1.20 SLOT WELLPR MILL P Continue Milling, 1.86 bpm at 4193 7,759.0 7,769.0 17:00 18:12 psi, FS Diff=435, WHP=7, BHP=3406, IA= 1050, OA=840 12/1/2019 12/1/2019 1.70 SLOT WELLPR MILL P Stall Motor, PU, PUW 30 k, RBIH, mill 7,769.0 7,775.0 18:12 19:54 ahead 1.86 bpm at 4,225 psi, FS Diff=453 psi, WHP12. BHP=3,387, IA=1,050, OA=838 12/1/2019 12/1/2019 0.65 SLOT WELLPR MILL P Wiper up to TOC @ 7,580', PUW 30 k 7,775.0 7,775.0 19:54 20:33 12/1/2019 12/1/2019 0.50 SLOT WELLPR MILL P RBIH, Mill Ahead, 1.86 bpm at 4,225 7,775.0 7,776.0 20:33 21:03 psi, FS Diff=453 psi, WHP12. BHP=3,387, IA=1,050, OA=838, orientor (HOT) turned off, interfierence issues 12/1/2019 12/1/2019 0.30 SLOT WELLPR MILL P PUH, PUW 30 k, confirm TF operation 7,776.0 7,776.0 21:03 21:21 turn TF left and right (good), RBIH 12/1/2019 12/2/2019 2.66 SLOT WELLPR MILL P Mill ahead, 1.86 bpm at 4,225 psi, FS 7,776.0 7,781.0 21:21 00:00 Diff=453 psi, WHP12. BHP=3,387, IA=1,050, OA=838, orientor (HOT) turned off, interfierence issues Page 3/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/2/2019 12/2/2019 0.30 SLOT WELLPR MILL P Mill ahead chasing no WOB @ 5 fpm, 7,781.0 7,791.0 00:00 00:18 1.86 bpm at 4,225 psi, FS Diff=453 psi, WHP12. BHP=3,387, IA=1,050, OA=838, orientor (HOT) turned off, interference issues 12/2/2019 12/2/2019 0.20 SLOT WELLPR MILL P Stall motor, PUH, PUW 30 k, re -start, 7,791.0 7,794.0 00:18 00:30 1.86 bpm at 4,178 psi, FS Diff=447, WHP=7, BHP=3,421, IA=1,051 psi, OA=839 12/2/2019 12/2/2019 2.00 SLOT WELLPR MILL P Stall motor 3.5 k DHWOB, PUH re- 7,794.0 7,804.0 00:30 02:30 start, continue milling ahead @ 1.86 bpm at 4,178 psi, FS Diff=447, WHP=7, BHP=3,421, IA=1,051 psi, OA=839, bring tool back on, seems TF is responding within spec. continue milling 12/2/2019 12/2/2019 0.34 SLOT WELLPR MILL P OBM, 1.86 bpm at 4,178 psi, FS 7,804.0 7,807.0 02:30 02:50 Diff=447, WHP=7, BHP=3,421, IA=1,051 psi, OA=839 12/2/2019 12/2/2019 0.20 SLOT WELLPR MILL P Milling break 63 fph 7,807' to 7,913', 7,807.0 7,813.2 02:50 03:02 stall motor, PUH, PUW 30 k, RBIH, Mill ahead 12/2/2019 12/2/2019 0.50 SLOT WELLPR MILL P PUH, PUW 30 k, RBIH, Mill ahead, 7,813.2 7,815.0 03:02 03:32 1.86 bpm at 4,178 psi, FS Diff=447, WHP=7, BHP=3,421, IA=1,051 psi, OA=839 12/2/2019 12/2/2019 0.50 SLOT WELLPR MILL P PUH, PUW 30 k 7,815.0 7,600.0 03:32 04:02 12/2/2019 12/2/2019 0.20 SLOT WELLPR DLOG P Log formation K1 (+4.0') 7,600.0 7,627.0 04:02 04:14 12/2/2019 12/2/2019 0.10 SLOT WELLPR REAM P Ream up at 60 fph @ MTF 7,627.0 7,611.0 04:14 04:20 12/2/2019 12/2/2019 0.90 SLOT WELLPR REAM P Continue Reaming as per RP up at 7,611.0 7,617.0 04:20 05:14 1.0 fpm, down at 5 fpm 12/2/2019 12/2/2019 0.20 SLOT WELLPR TRIP P RIH and dry tag 7819' 7,617.0 7,819.0 05:14 05:26 12/2/2019 12/2/2019 1.80 SLOT WELLPR TRIP P POOH 7,819.0 60.0 05:26 07:14 Jog @ 500', continue out of hole 12/2/2019 12/2/2019 0.60 SLOT WELLPR PULD P Bump up, space out, 60.0 60.0 07:14 07:50 12/2/2019 12/2/2019 1.20 SLOT WELLPR PULD T While stripping off the well observed 60.0 60.0 07:50 09:02 the BHA move up with the injector approximately 1'. When injector cart was stopped BHA continued to move a short distance then stop once the CTC bumped up against the stripper. Stripped down, stabbed injector and worked PD checklist, RIH, bumped up and spaced out. Repeaded PUD with same result, stabbed injector, RIH, Bump up, space out deeper, push pull to 8k no movement. 12/2/2019 12/2/2019 0.20 SLOT WELLPR OWFF T Bleed in increments - 1 bbl off the 60.0 60.0 09:02 09:14 tubing. Well head fell to zero and built to 540 psi 12/2/2019 12/2/2019 0.20 SLOT WELLPR PULD T Work PD check list from current 60.0 60.0 09:14 09:26 position. Bump up set counters. 12/2/2019 12/2/2019 1.30 SLOT WELLPR TRIP T RIH 60.0 7,415.0 09:26 10:44 1PU Wt 31 k Ib At 7400' 12/2/2019 12/2/2019 0.20 SLOT WELLPR DLOG T Tie into the HRZ for a +2' correction 7,415.0 7,446.2 10:44 10:56 I Page 4/39 Report Printed: 1/27/2020 -# Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/2/2019 12/2/2019 0.70 SLOT WELLPR DLOG T Park @ 7600.76/5767.15 MD/TVD 7,446.2 7,600.0 10:56 11:38 and monitor pressure. Trap 3548 psi observe pressure fall to 3299 psi BHP = 11.00 ppg EMW "' note pressure stabilized @ 11.0 ppg, Started bleeding IA, Bottom hole pressure fell slightly, Suspect OV check leaking or TxIA. 12/2/2019 12/2/2019 0.45 SLOT WELLPR DISP T Pump 11. pph NaBr/NaCl KW to the 7,600.0 7,600.0 11:38 12:05 bit. 1.94/1.98 bpm in/out CT 4301 psi 12/2/2019 12/2/2019 1.30 SLOT WELLPR DISP T PUH displacing well to 11.3 heavy KW 7,600.0 62.7 12:05 13:23 fluid 12/2/2019 12/2/2019 1.00 SLOT WELLPR PULD T At surface, flow check - good, Bump 62.7 0.0 13:23 14:23 up, space out, close 2-3/8" deployment rams, pop off and strip up, BHA came up with injector cart. LD BHA #1 over a dead well 12/2/2019 12/2/2019 0.70 SLOT WELLPR CTOP T Examine BHA#1, OD tape measured 0.0 0.0 14:23 15:05 2.32-2.33" at the area where the 2- 3/8" deployment rams bite the tool. 12/2/2019 12/2/2019 1.75 SLOT WELLPR CTOP T Un Stab, change checks, pick up test 0.0 0.0 15:05 16:50 upper section with blind sub and nozzle. Bump up, space out, push pull- good, strip off - good. Lay down upper test tool. 12/2/2019 12/2/2019 1.00 SLOT WELLPR CIRC T Skid cart, inspect pack offs- good, 0.0 0.0 16:50 17:50 make up nozzle, stab injector, jet stack flush MM line. Lots of cement debris and frac sand retuned to the shaker. 12/2/2019 12/2/2019 1.10 SLOT WELLPR PULD P PU BHA#2, real time caliper upper 0.0 24.1 17:50 18:56 coil trak. 12/2/2019 12/2/2019 1.50 SLOT WELLPR TRIP P RIH 24.1 7,600.0 18:56 20:26 12/2/2019 12/2/2019 0.20 SLOT WELLPR DLOG P Log formation w/gamma no correction. 7,636.0 7,736.0 20:26 20:38 12/2/2019 12/2/2019 0.30 SLOT WELLPR TRIP P Continue IH to caliper logging depth, 7,736.0 7,814.0 20:38 20:56 allow fingers to fully open 12/2/2019 12/2/2019 0.20 SLOT WELLPR DLOG P Log up at 50 fpm with caliper 7,814.0 7,590.0 20:56 21:08 12/2/2019 12/2/2019 0.20 SLOT WELLPR TRIP P RBIH 7,590.0 7,814.0 21:08 21:20 12/2/2019 12/2/2019 0.20 SLOT WELLPR DLOG P Repeat pass with caliper @ 50 fpm 7,814.0 7,590.0 21:20 21:32 12/2/2019 12/2/2019 1.10 SLOT WELLPR TRIP P POOH 7,590.0 24.1 21:32 22:38 12/2/2019 12/2/2019 0.50 SLOT WELLPR OWFF P At surface, check well for flow, PJSM, 24.1 24.1 22:38 23:08 inspect Coil Wear above CTC, (min 0.11 inch) 12/2/2019 12/2/2019 0.70 SLOT WELLPR PULD P LD Caliper over a dead well 24.1 0.0 23:08 23:50 12/2/2019 12/3/2019 0.17 SLOT WELLPR CTOP P PJSM/prep changing CTC 0.0 0.0 23:50 00:00 12/3/2019 12/3/2019 2.00 SLOT WELLPR CTOP P Cut off CTC, trim 20' of coil (min 0.0 0.0 00:00 02:00 0.110"), ream and dress coil 12/3/2019 12/3/2019 0.75 SLOT WELLPR CTOP P Install new CTC, Pull test 35 k (good) 0.0 0.0 02:00 02:45 12/3/2019 12/3/2019 0.50 SLOT WELLPR CTOP P Head up BHI UQ 0.0 0.0 02:45 03:15 12/3/2019 12/3/2019 0.75 SLOT WELLPR PULD P MU BHI tools in pipeshed 0.0 0.0 03:15 04:00 Page 5/39 Report Printed: 1/27/2020 Y L.. 4 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (WEI) 12/3/2019 12/3/2019 3.00 SLOT WELLPR WAIT T Wait on Haley underreamer hot shot 0.0 54.2 04:00 07:00 from dead horse 12/3/2019 12/3/2019 1.00 SLOT WELLPR PULD T PU BHA#2 over a dead well, Coiltrak 0.0 54.2 07:00 08:00 w BOT 2-1/8" straight extreme motor over a Haley under reamer dressed for 7" with blades that open to 6.12" and a 2.80 D331 ridgeset.2.81 go, 2.80 no. Check pack offs -good, bump up 12/3/2019 12/3/2019 1.50 SLOT WELLPR TRIP T RIH, 54.2 7,598.0 08:00 09:30 PU Wt Ct 28 k lbs, form 7600' 12/3/2019 12/3/2019 0.10 SLOT WELLPR DLOG T Tie into the K1 for +2' corection 7,598.0 7,625.0 09:30 09:36 12/3/2019 12/3/2019 0.70 SLOT WELLPR DISP T Displace KW with milling fluid 7,625.0 7,598.0 09:36 10:18 12/3/2019 12/3/2019 0.20 SLOT WELLPR DISP T Shut in choke, performed injectivity 7,625.0 7,598.0 10:18 10:30 test. Inject 0.2 bpm BHP rose quickly to 3672 psi, plateaued briefly then climbed slowly to 3750 psi. Shutdown 12/3/2019 12/3/2019 0.40 SLOT WELLPR UREM T Close EDC RIH to 7620' attempt to 7,598.0 7,642.0 10:30 10:54 open blades in open section of 7" to get free spin numbers, stall. RIH to 7650' online, CT 3247 psi @ 1/1 bpm in / out, free spin 859 psi, Back ream up hole to 7642' stall. 12/3/2019 12/3/2019 1.00 SLOT WELLPR UREM T PU, try to RBIH, stack out, PUH into 7,642.0 7,615.0 10:54 11:54 tubing. RBIH to 7650'w pumps off. PUH pumping 1 bpm, fre spin 815 psi, stall at 7642'. Repeat, stall at 7641.4'. PUH to 7615' with pumps off. 12/3/2019 12/3/2019 0.10 SLOT WELLPR UREM T RIH to 7619' Set rate, CT 4471 psi @ 7,642.0 7,619.0 11:54 12:00 1.5/1.5 bpm in/out. BHP 3418 psi, Ream slowly down with multiple stalls, 12/3/2019 12/3/2019 5.00 SLOT WELLPR UREM T Reaming, CT 4317 psi @ 1.5/1.5 bpm 7,619.0 7,625.0 12:00 17:00 in/out. BHP 3423 psi. OBD CT Wt 11.3 k lbs, WOB 0.8 Mill slowly with -3 stalls per hr MicoMotion out is acting up, reading higher flow than is true. ROP 1.2 ft/hr 12/3/2019 12/3/2019 5.30 SLOT WELLPR UREM T OB reaming, CT 4120 psi 1.5/1.5 bpm 7,625.0 7,657.0 17:00 22:18 in/out. 1058 psi motor work, BHP 3427 psi, CT 13.2 k lbs, WOB 0.8 k lbs Free spin 824 psi, PU WT 28 k lbs. Multiple stalls @ 7226.5' slow going 12/3/2019 12/4/2019 1.70 SLOT WELLPR UREM T OB reaming, CT 4281 psi 1.5/1.5 bpm 7,625.0 7,627.4 22:18 00:00 in/out. 1208 psi motor work, BHP 3410 psi, CT 11.8 k lbs, WOB 0.02 k lbs Milling ahead, 6.0 ft/hr 12/4/2019 12/4/2019 2.00 SLOT WELLPR UREM T OB reaming, CT 4281 psi 1.5/1.5 bpm 7,627.4 7,628.5 00:00 02:00 in/out. Diff=1050 psi, BHP 3410 psi, CT 13 k lbs, WOB 0.02 k lbs Milling ahead, Stall @ 7627.9' 12/4/2019 12/4/2019 2.00 SLOT WELLPR UREM T OB reaming, CT 4150 psi 1.47/1.5 7,628.5 7,629.7 02:00 04:00 bpm in/out. Diff=1122 psi, BHP 3410 psi, CT 13.8 k lbs, WOB 0.02 k lbs Milling ahead, Page 6/39 Report Printed: 1/27/2020 r Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/4/2019 12/4/2019 2.00 SLOT WELLPR UREM T OB reaming, CT 4123 psi 1.47/1.5 7,629.7 7,630.9 04:00 06:00 bpm in/out. Diff=1053 psi, BHP 3401 psi, CT 13.3 k lbs, WOB 0.02 k lbs Milling ahead, Stall @ 7630.5 12/4/2019 12/4/2019 2.00 SLOT WELLPR UREM T OB reaming, CT 4120 psi 1.47/1.5 7,630.9 7,632.0 06:00 08:00 bpm in/out. Diff=1084 psi, BHP 3410 psi, CT 13.8 k lbs, WOB 0. k lbs Milling ahead, Stall @ 7631.7' 12/4/2019 12/4/2019 2.00 SLOT WELLPR UREM T OB reaming, CT 4045 psi 1.47/1.5 7,632.0 7,633.1 08:00 10:00 bpm in/out. Diff=993 psi , BHP 3410 psi, CT 13.7 k lbs, WOB 0.29 k lbs Milling ahead, Stall @ 7632.9' 12/4/2019 12/4/2019 2.00 SLOT WELLPR UREM T OB reaming, CT 4036 psi 1.47/1.5 7,633.1 7,634.2 10:00 12:00 bpm in/out. Diff=1053 psi, BHP 3407 psi, CT 13.1 k lbs, WOB 0.44 k lbs Milling ahead 12/4/2019 12/4/2019 0.90 SLOT WELLPR UREM T OB Reaming, CT 3,990 psi, 1.47/1.51 7,634.2 7,634.7 12:00 12:54 bpm in/out, Diff=1,034 psi, pump 5x5 time 2 12/4/2019 12/4/2019 1.70 SLOT WELLPR TRIP T POOH, chasing sweep to surface 7,634.7 54.2 12:54 14:36 12/4/2019 12/4/2019 0.70 SLOT WELLPR PULD T PUD and LD Hailey UR milling 54.2 0.0 14:36 15:18 assembly *** Note: Gauge - Upper Blades 5.875", Lower Blades 5.625", excessive wear on both blade pins 12/4/2019 12/4/2019 1.10 SLOT WELLPR PULD T MU, Hailey UR assembly BHA #4 0.0 54.2 15:18 16:24 12/4/2019 12/4/2019 1.30 SLOT WELLPR TRIP T RI H, with UR BHA #4, Hailey UR with 54.2 7,444.0 16:24 17:42 upper 6.1" blades, lower 4.875" blades. 12/4/2019 12/4/2019 0.30 SLOT WELLPR DLOG T Log formation for depth control -1.5'. 7,444.0 7,464.0 17:42 18:00 Close EDC 12/4/2019 12/4/2019 0.70 SLOT WELLPR TRIP T Continue in hole, RIW=13.7K 7,464.0 7,633.0 18:00 18:42 12/4/2019 12/4/2019 2.70 SLOT WELLPR UREM T 7633. Creep in hole, Stall at initial 7,633.0 7,661.0 18:42 21:24 contact them U/reem. 1.5 BPM @ 4199 PSI FS, BHP=3406 12/4/2019 12/4/2019 1.80 SLOT WELLPR UREM T 7661, Stall, PUW=27.5K, Goback to 7,661.0 7,664.0 21:24 23:12 reeming, 1.5 BPM @ 4200 PSI FS, BHP-3406 12/4/2019 12/5/2019 0.80 SLOT WELLPR UREM T 7664', Stail PUW=28.5K. Goback to 7,664.0 7,664.8 23:12 00:00 reeming 1.5 BPM @ 4199 PSI FS, BHP=3706 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T Continue under reming cement, 1.5 7,664.8 7,667.6 00:00 02:00 BPM @ 4200 PSI FS, BHP=3226 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T 7667', Continue under reaming, Low 7,667.6 7,672.7 02:00 04:00 ROP, No stalls, 1.5 BPM @ 4200 PSI FS, BHP=3431. Full returns 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T 7672.7' Continue under reaming. No 7,672.7 7,678.6 04:00 06:00 stalls, Full returns, 1.5 BPM @ 4190 PSI. BHP=3426 PSI 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,052 psi, 7,678.6 7,682.3 06:00 08:00 DIff=3,385, WHP=160, BHP=3,385, IA=949, OA=795 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,052 psi, 7,682.3 7,685.0 08:00 10:00 Diff=3,385, WHP=160, BHP=3,385, IA=949, OA=795 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,052 psi, 7,685.0 7,679.6 10:00 12:00 DIff=3,385, WHP=160, BHP=3,385, IA=949, OA=795 Page 7/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) t= 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/5/2019 12/5/2019 0.25 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,052 psi, 7,679.6 7,688.1 12:00 12:15 Diff=3,385, WHP=160, BHP=3,385, IA=949, OA=795 12/5/2019 12/5/2019 0.25 SLOT WELLPR UREM T Wiper up hole to 7,629.6'@ 1 fpm, 7,688.1 7,629.6 12:15 12:30 PUW 27 k 12/5/2019 12/5/2019 2.50 SLOT WELLPR UREM T Wiper in hole @ 1 fpm RIW 13.1 k, 7,629.6 7,688.1 12:30 15:00 *** Note: Stalled and worked past 7669' and 7672' 12/5/2019 12/5/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,052 psi, 7,688.1 7,690.2 15:00 17:00 DIff=3,385, WHP=160, BHP=3,385, IA=949, OA=795 12/5/2019 12/5/2019 3.50 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,052 psi, 7,690.2 7,694.0 17:00 20:30 Diff=3,385, WHP=160, BHP=3,385, IA=949, OA=795 12/5/2019 12/5/2019 0.50 SLOT WELLPR BKRM T Back ream up hole 7694 to 7675, 7,694.0 7,675.0 20:30 21:00 Pump 5 X 5 sweeps coming off bottom, PUW=29K 12/5/2019 12/5/2019 1.10 SLOT WELLPR TRIP T Stop and open EDC, POOH to inspect 7,675.0 55.0 21:00 22:06 BHA, Overpull @ 7581„ Milled D nipple 12/5/2019 12/5/2019 0.90 SLOT WELLPR PULD T Tag up and space out, PUD BHA #4. 55.0 0.0 22:06 23:00 All under reamer blades at surface. Blades out Upper @ 5.25", Lower out @ 4.375. Heavy wear on hinge pins. 12/5/2019 12/5/2019 0.50 SLOT WELLPR BHAH T Reconfigure BHA, swap out 2 1/8 BOT 0.0 54.2 23:00 23:30 straight motor and 2 1/4" Haily under reamer with 5" lowers and 6.1 uppers. Ran used hinge pins from 1 st run. D- 331 out 2.79 NoGo 12/5/2019 12/6/2019 0.50 SLOT WELLPR PULD T Pressure deploy BHA#5, Make up to 54.2 54.2 23:30 00:00 injector 12/6/2019 12/6/2019 0.30 SLOT WELLPR PULD T Continue pressure deploy BHA#5, 54.2 54.2 00:00 00:18 Surface test BHA, Strip on injector 12/6/2019 12/6/2019 1.40 SLOT WELLPR TRIP T Trip in well, BHA #5, EDC open 54.2 7,404.0 00:18 01:42 12/6/2019 12/6/2019 0.30 SLOT WELLPR DLOG T Close EDC, Log Tie in for -1.5' 7,404.0 7,459.0 01:42 02:00 12/6/2019 12/6/2019 0.30 SLOT WELLPR TRIP T Continue in well. 7,458.1 7,645.0 02:00 02:18 12/6/2019 12/6/2019 0.20 SLOT WELLPR UREM T 7645 bring on pumps start reaming 7,645.0 7,680.2 02:18 02:30 down 12/6/2019 12/6/2019 2.00 SLOT WELLPR UREM T 7682, Stall, pick up and restart 7,680.2 7,684.7 02:30 04:30 12/6/2019 12/6/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,370 psi, 7,684.7 7,686.5 04:30 06:30 DIff=1,182, WHP=157, BHP=3,439, IA=949, OA=827 12/6/2019 12/6/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,226 psi, 7,686.5 7,693.7 06:30 08:30 DIff=1,109, WHP=157, BHP=3,435, IA=949, OA=827 12/6/2019 12/6/2019 2.00 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,171 psi, 7,693.7 7,694.4 08:30 10:30 DIff=1,114, WHP=157, BHP=3,431, IA=949, OA=827 12/6/2019 12/6/2019 1.70 SLOT WELLPR UREM T OB reaming, 1.5 bpm at 4,194 psi, 7,694.4 7,695.4 10:30 12:12 Diff=1,126, WHP=157, BHP=3,437, IA=949, OA=827, pump 5x5 sweep 12/6/2019 12/6/2019 2.00 SLOT WELLPR UREM T Pump second 5x5, POOH, chasing 7,695.4 54.2 12:12 14:12 sweeps to surface 12/6/2019 12/6/2019 1.50 SLOT WELLPR TRIP T PJSM, PUD UR BHA#5 54.2 0.0 14:12 15:42 *** Note: Upper Blades gauged 5.5" (6.1 "), Lower Blade 4." 4.875" Page 8/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/6/2019 12/6/2019 0.50 SLOT WELLPR CTOP T PU/MU nozzle, stab INJH onto stump, 0.0 0.0 15:42 16:12 jet BOPE and surface lines @ 2.0 bpm 12/6/2019 12/6/2019 0.70 SLOT WELLPR BHAH T Clean rig floor, tear down and re-dress 0.0 0.0 16:12 16:54 UR 12/6/2019 12/6/2019 1.00 SLOT WELLPR PULD T PD BHA#6 Under reamer with 6.1" 0.0 54.2 16:54 17:54 upper blades, 5" lower blades. Make up to coil and surface test. Tag up. set counters 12/6/2019 12/6/2019 1.10 SLOT WELLPR TRIP T RIH BH #6 54.2 7,405.0 17:54 19:00 12/6/2019 12/6/2019 0.20 SLOT WELLPR DLOG T Log formation for-1.5', PUW=29K 7,405.0 7,448.0 19:00 19:12 12/6/2019 12/6/2019 0.20 SLOT WELLPR TRIP T Continue in hole, Shut EDC 7,448.0 7,618.0 19:12 19:24 12/6/2019 12/6/2019 0.90 SLOT WELLPR UREM T 7618. Bring on pumps 1.5 BPM @ 7,618.0 7,620.0 19:24 20:18 4375 PSI FS, BHP=3419. Start reaming down to 7671 then pick up to 7620. Ream back down to 7671 and stall. PUH. Motor will not come out of stall condition. Bleed off CT pressure and repeat. No good 12/6/2019 12/6/2019 1.60 SLOT WELLPR TRIP T Trip out for possible motor failure 7,620.0 54.0 20:18 21:54 12/6/2019 12/6/2019 0.80 SLOT WELLPR PULD T At surface, Tag up and space out. 54.0 0.0 21:54 22:42 PJSM PUD BHA#6 12/6/2019 12/6/2019 0.30 SLOT WELLPR BHAH T Motor has come unsrewed between 0.0 0.0 22:42 23:00 Stator section and flex drive housing. Pics on S drive. Lay down motor. P/U back up motor 12/6/2019 12/6/2019 0.80 SLOT WELLPR PULD T PD BHA#7 with 2 1/8 BOT straight 0.0 54.2 23:00 23:48 motor and haily under reamer. Upper bladed 6", Lower blades 5" M/U to coil and surface test. Check packoffs - Good 12/6/2019 12/7/2019 0.20 SLOT WELLPR TRIP T RI BHA#7 54.2 853.0 23:48 00:00 12/7/2019 12/7/2019 1.20 SLOT WELLPR TRIP T Continue in well 853.0 7,405.0 00:00 01:12 12/7/2019 12/7/2019 0.20 SLOT WELLPR DLOG T Log formtion for -2', PUW=29K 7,405.0 7,463.0 01:12 01:24 12/7/2019 12/7/2019 0.20 SLOT WELLPR TRIP T Continue in well 7,463.0 7,650.0 01:24 01:36 12/7/2019 12/7/2019 0.40 SLOT WELLPR UREM T Bring on pumps, 1.5 BPM @ 4242 PSI 7,650.0 7,683.0 01:36 02:00 FS, BHP=3383. Wash / ream down to 7683', RIW=14.3K 12/7/2019 12/7/2019 0.10 SLOT WELLPR UREM T 7683. Hard spot with stall, PUW29K. 7,683.0 7,695.0 02:00 02:06 PUH and reset 12/7/2019 12/7/2019 1.40 SLOT WELLPR UREM T 7694, Under ream, 1.5 BPM @ 4033 7,695.0 7,697.0 02:06 03:30 PSI FS, BHP=3446 12/7/2019 12/7/2019 2.00 SLOT WELLPR UREM T 7697, Stall, PUH and restart, 1.5 BPM 7,697.0 7,697.2 03:30 05:30 @ 4034 PSI FS, BHP=3448 12/7/2019 12/7/2019 2.00 SLOT WELLPR UREM T OB, Reaming down 1.51 bpm at 4,316 7,697.2 7,698.4 05:30 07:30 psi, Diff=1,185 psi, WHP=141, BHP=3449, IA=953, OA=800 12/7/2019 12/7/2019 2.00 SLOT WELLPR UREM T OB, Reaming down 1.51 bpm at 4,316 7,698.4 7,700.5 07:30 09:30 psi, Diff=1,185 psi, WHP=141, BHP=3449, IA=953, OA=800 12/7/2019 12/7/2019 2.00 SLOT WELLPR UREM T OB, Reaming down 1.51 bpm at 4,316 7,700.5 7,701.3 09:30 11:30 psi, Diff=1,185 psi, WHP=141, BHP=3449, IA=953, OA=800 12/7/2019 12/7/2019 0.35 SLOT WELLPR UREM T Ream up at 1 fpm from bottom 7701.3' 7,701.3 7,620.0 11:30 11:51 1 I to 7,620' Page 9/39 Report Printed: 1/27/2020 y# Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/7/2019 12/7/2019 1.45 SLOT WELLPR TRIP T POOH, chasing sweeps to surface 7,620.0 52.2 11:51 13:18 12/7/2019 12/7/2019 1.20 SLOT WELLPR TRIP T PJSM, PUD Reaming BHA #7 52.2 0.0 13:18 14:30 12/7/2019 12/7/2019 1.00 SLOT WELLPR CTOP T Remove BHI Upper Checks, Slide cart 0.0 0.0 14:30 15:30 forward, stab onto well, jet BOPE and surface lines. 12/7/2019 12/7/2019 0.75 SLOT WHDBOP BOPE P PT inner reel valve and pac-off. 250 0.0 0.0 15:30 16:15 low/4,000 high 12/7/2019 12/7/2019 0.75 SLOT WHDBOP BOPE P Service wellhead and rig valves for 0.0 0.0 16:15 17:00 BOPE test 12/7/2019 12/7/2019 5.00 SLOT WHDBOP BOPE P Begin testing following rig testing 0.0 0.0 17:00 22:00 checklist, witness waived by Adam Earl of the AOGCC. Test pressure 250/4000 psi low/high. All tests passed initial inspection. 12/7/2019 12/7/2019 0.70 SLOT WELLPR RURD P Skid injector to rig floor. Install quick 0.0 0.0 22:00 22:42 test sub. Reinstall float valves in upper quick connect. 12/7/2019 12/7/2019 1.00 SLOT WELLPR PULD T PJSM, Load BHA#8 into PDL, P/U 0.0 0.0 22:42 23:42 Lower BHA under reamer & BOT straight motor 12/7/2019 12/8/2019 0.30 SLOT WELLPR PULD T PD BHA#8 with Haily under reamer 0.0 54.2 23:42 00:00 with 6.1" upper blades / 5.0" lower blades & BOT 2 1/8 straight motor 12/8/2019 12/8/2019 0.60 SLOT WELLPR PULD T Continue PD BHA#8. Make up to coil 54.2 54.2 00:00 00:36 and surface test tool. Tag up and set counters 12/8/2019 12/8/2019 1.40 SLOT WELLPR TRIP T Trip in well, BHA #8, EDC open 54.2 7,405.0 00:36 02:00 12/8/2019 12/8/2019 0.30 SLOT WELLPR DLOG T Log formation for -2' correction. 7,405.0 7,458.0 02:00 02:18 PUW=30K 12/8/2019 12/8/2019 0.10 SLOT WELLPR TRIP T Continue in well to under ream cement 7,458.0 7,650.0 02:18 02:24 12/8/2019 12/8/2019 0.10 SLOT WELLPR UREM T 7650, Bring pumps online 1.52 BPM 7,650.0 7,672.0 02:24 02:30 @ 4216 PSI FS, BHP=3400. RIH working reamer open 12/8/2019 12/8/2019 2.00 SLOT WELLPR UREM T 7672', Wash down, 1.5 BPM @4761 7,672.0 7,696.8 02:30 04:30 PSI FS. Stall @ 7687, 7699 X2 12/8/2019 12/8/2019 2.00 SLOT WELLPR UREM T OBR 1.51 bpm at 4,253 psi, Diff=969, 7,696.8 7,697.6 04:30 06:30 WHP=137, BHP=3,422, IA=941, OA=738 12/8/2019 12/8/2019 2.00 SLOT WELLPR UREM T OBR 1.51 bpm at 4,253 psi, Diff=969, 7,697.6 7,699.6 06:30 08:30 WHP=137, BHP=3,422, IA=941, OA=738 12/8/2019 12/8/2019 2.00 SLOT WELLPR UREM T OBR 1.51 bpm at 4,253 psi, Diff=969, 7,699.6 7,700.2 08:30 10:30 WHP=137, BHP=3,422, IA=941, OA=738 12/8/2019 12/8/2019 2.00 SLOT WELLPR UREM T OBR 1.51 bpm at 4,339 psi, 7,700.2 7,703.0 10:30 12:30 Diff=1,098, WHP=120, BHP=3,461, IA=947, OA=767 12/8/2019 12/8/2019 2.00 SLOT WELLPR UREM T OBR 1.51 bpm at 4,339 psi, 7,703.0 7,705.0 12:30 14:30 Diff=1,098, WHP=120, BHP=3,461, IA=947, OA=767 12/8/2019 12/8/2019 3.50 SLOT WELLPR UREM T OBR 1.5 BPM @ 4053 PSI FS, 7,705.0 7,706.0 14:30 18:00 BHP=3454 12/8/2019 12/8/2019 3.00 SLOT WELLPR UREM T 7706.2 Reaming, 1.5 BPM @ 4053 7,706.0 7,707.9 18:00 21:00 PSI FS, BHP=3452 12/8/2019 12/9/2019 3.00 SLOT WELLPR UREM T 7707.9', Reaming 1.5 BPM @ 4070 7,707.9 7,709.8 21:00 00:00 PSI FS, BHP=3447 Page 10/39 Report Printed: 1/27/2020 i Operations Summary (with Timelog Depths) -1 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/9/2019 12/9/2019 2.20 SLOT WELLPR UREM T 7710', Continue to under ream 7,709.8 7,710.7 00:00 02:12 cement, 1.5 BPM @ 4070 PSI FS, BHP=3446 12/9/2019 12/9/2019 1.60 SLOT WELLPR TRIP T Sweeps coming out. Trip out to 7,710.7 49.8 02:12 03:48 inspect BHA, PUW=29K. Open EDC @7617'. Jog back in hole 500' to 800' 12/9/2019 12/9/2019 1.00 SLOT WELLPR PULD T Tag up and space out, PJSM, PUD 49.8 0.0 03:48 04:48 BHA #8, D-331 out @ 2.79 NoGo 12/9/2019 12/9/2019 0.80 SLOT WELLPR PULD T Make up new under reamer BHA#9 0.0 54.2 04:48 05:36 with 4 1/8" lower blades, 5" upper blades. PD BHA. Make up to coil and surface test 12/9/2019 12/9/2019 1.20 SLOT WELLPR TRIP T RIH with Hailey UR BHA #9 54.2 7,405.0 05:36 06:48 12/9/2019 12/9/2019 0.15 SLOT WELLPR DLOG T Log formatino for depth (-2.0') 7,405.0 7,441.5 06:48 06:57 12/9/2019 12/9/2019 0.20 SLOT WELLPR TRIP T Continue IH 7,441.5 7,650.0 06:57 07:09 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T OB Reaming, 1.52 bpm at 3,972 psi, 7,650.0 7,711.9 07:09 09:09 Diff=663, WHP=97, BHP=3,440, IA=950, OA=782 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T OB Reaming, 1.52 bpm at 3,972 psi, 7,711.9 7,713.8 09:09 11:09 Diff=663, WHP=97, BHP=3,440, IA=950, OA=782 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T OB Reaming, 1.52 bpm at 3,972 psi, 7,713.8 7,714.8 11:09 13:09 Diff=663, WHP=97, BHP=3,440, IA=950, OA=782 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T OB Reaming, 1.52 bpm at 3,921 psi, 7,714.8 7,716.1 13:09 15:09 Diff=629, WHP=104, BHP=3,443, IA=949, OA=790 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T OB Reaming, 1.52 bpm at 3,921 psi, 7,716.1 7,718.3 15:09 17:09 Diff=629, WHP=104, BHP=3,443, IA=949, OA=790 12/9/2019 12/9/2019 1.85 SLOT WELLPR UREM T OB Reaming, 1.50 bpm at 3,949 psi, 7,718.3 7,719.8 17:09 19:00 Diff=654, WHP=102, BHP=3,447, IA=949, OA=793 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T 7719.8 Reaming, 1.5 BPM @ 3950 7,719.8 7,721.8 19:00 21:00 PSI FS, BHP=3446 12/9/2019 12/9/2019 2.00 SLOT WELLPR UREM T 7721', Under reaming, 1.5 BPM @ 7,721.8 7,723.0 21:00 23:00 3950 PSI FS, BHP=3445 12/9/2019 12/10/2019 1.00 SLOT WELLPR UREM T 7723', Under reaming, 1.5 BPM @ 7,723.0 7,725.4 23:00 00:00 3950 PSI FS, BHP=3452 Midnight 7725.4 12/10/2019 12/10/2019 2.00 SLOT WELLPR UREM T Continue under reaming 1.5 BPM @ 7,725.4 7,727.3 00:00 02:00 3950 PSI FS, BHP=3455. Stall nd reset @ 7725.5, PUW=28K 12/10/2019 12/10/2019 2.00 SLOT WELLPR UREM T Continue reaming, 1.5 BPM @ 3950 7,727.3 7,729.7 02:00 04:00 PSI FS, BHP=3513 12/10/2019 12/10/2019 2.00 SLOT WELLPR UREM T Continue under reaming, 1.5 BPM @ 7,729.7 7,732.2 04:00 06:00 3950 PSI FS, BHP=3578 12/10/2019 12/10/2019 1.00 SLOT WELLPR UREM T OB reaming 1.51 bpm to 4,135 psi, 7,732.2 7,732.6 06:00 07:00 Diff=682 psi, WHP=156, BHP=3,553, IA=947, OA=819, pump sweeps 12/10/2019 12/10/2019 1.50 SLOT WELLPR TRIP T POOH, chasing sweeps to surface 7,732.6 52.4 07:00 08:30 12/10/2019 12/10/2019 1.00 SLOT WELLPR PULD T At surface space out, PUD LD 52.4 0.0 08:30 09:30 reaming BHA#9 12/10/2019 12/10/2019 1.30 SLOT WELLPR PULD T PU/MU Caliper assembly 0.0 0.0 09:30 10:48 Page 11/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) ,kap 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth (ftKB) 12/10/2019 12/10/2019 1.00 SLOT WELLPR PULD T Perform surface test w/caliper, on test, 0.0 22.0 10:48 11:48 trouble shoot, found electric issues with cable, make up new connection. Surface test good, 12/10/2019 12/10/2019 1.50 SLOT WELLPR TRIP T RIH with Caliper BHA #10 22.0 7,600.0 11:48 13:18 12/10/2019 12/10/2019 0.20 SLOT WELLPR DLOG T Log Formation for depth (-2.0) 7,600.0 7,657.7 13:18 13:30 12/10/2019 12/10/2019 0.40 SLOT WELLPR DLOG T Log down at 50 fpm 7,550'-7,727' 7,657.7 7,727.0 13:30 13:54 12/10/2019 12/10/2019 0.40 SLOT WELLPR DLOG T Make repeat pass 7,550'-7,727' 7,727.0 7,550.0 13:54 14:18 12/10/2019 12/10/2019 1.20 SLOT WELLPR TRIP T POOH, while uploaded real time data 7,550.0 21.7 14:18 15:30 to Haliburton town 12/10/2019 12/10/2019 1.00 SLOT WELLPR PULD T At surface, PUD Caliper assembly 21.7 0.0 15:30 16:30 12/10/2019 12/10/2019 0.50 SLOT WELLPR PULD T Inspect Caliper, found bent and 0.0 0.0 16:30 17:00 broken Bow Spring Centralizer. all parts returned to surface. Pre -load PDL 12/10/2019 12/10/2019 0.30 SLOT WELLPR PULD T Data in, discuss plan forward, BOT 0.0 0.0 17:00 17:18 dressed Hailey UR 4.875" in upper station, 4.125" in lower station 12/10/2019 12/10/2019 1.10 SLOT WELLPR PULD T PD Hailey UR assembly 0.0 54.2 17:18 18:24 12/10/2019 12/10/2019 1.30 SLOT WELLPR TRIP T RIH 54.2 7,405.0 18:24 19:42 12/10/2019 12/10/2019 0.20 SLOT WELLPR DLOG T Log formation for depth control (-2.0') 7,405.0 7,441.0 19:42 19:54 12/10/2019 12/10/2019 0.30 SLOT WELLPR TRIP T Continue IH 7,441.0 7,725.0 19:54 20:12 12/10/2019 12/10/2019 0.30 SLOT WELLPR UREM T Attempt to bring pump up online, 7,725.0 7,650.0 20:12 20:30 unable to fired up motor, pull up hole to 7,650', still can't bring pump online, pull up to 7,625', open EDC 12/10/2019 12/10/2019 1.40 SLOT WELLPR TRIP T POOH 7,650.0 48.0 20:30 21:54 12/10/2019 12/10/2019 0.50 SLOT WELLPR PULD T Tag up space out. PJSM PUD BHA 48.0 0.0 21:54 22:24 #11 12/10/2019 12/10/2019 1.00 SLOT WELLPR BHAH T Back off motor and under reamer. Test 0.0 0.0 22:24 23:24 motor inconclusive. Lay down motor. Everything on under reamer in spec. P/U back up motor and make up 12/10/2019 12/11/2019 0.60 SLOT WELLPR PULD T PD BHA#12 with 2 1/8" BOT straight 0.0 54.2 23:24 00:00 motor, Haily under reamer w/4.85" & 4.125' blades. Make up to coil and surface test 12/11/2019 12/11/2019 0.10 SLOT WELLPR PULD T Complete surface test BHA #12 54.2 54.2 00:00 00:06 12/11/2019 12/11/2019 1.40 SLOT WELLPR TRIP T Trip in hole BHA#12 54.2 7,405.0 00:06 01:30 12/11/2019 12/11/2019 0.10 SLOT WELLPR DLOG T Log formation for +6'. Inspect / clean 7,405.0 7,469.0 01:30 01:36 counter wheel. PUW=28K 12/11/2019 12/11/2019 0.40 SLOT WELLPR TRIP T Continue in well. 7651' close EDC 7,469.0 7,725.0 01:36 02:00 12/11/2019 12/11/2019 2.00 SLOT WELLPR UREM T 7725 start bringing pumps online. 7,725.0 7,731.0 02:00 04:00 Pressures highl.4 BPM @ 4811 PSI FS, BHP=3478. Start reaming down 12/11/2019 12/11/2019 2.00 SLOT WELLPR UREM T 7731', Continue reaming 1.4 BPM @ 7,731.0 7,735.0 04:00 06:00 4811 PSI FS, BHP=3494 Page 12/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr)Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/11/2019 12/11/2019 2.00 SLOT WELLPR UREM T 7735'. Continue to under ream down, 7,735.0 7,737.7 06:00 08:00 High vibration. 1.48 BPM @ 4304 PSI FS, BHP=3510 12/11/2019 12/11/2019 2.00 SLOT WELLPR UREM T 7737.7 Continue to ream down. less 7,737.7 7,739.0 08:00 10:00 vibration still 4 to 5. 1.48 BPM @ 4304 PSI FS, BHP=3510 12/11/2019 12/11/2019 2.00 SLOT WELLPR UREM T 7739' Ream down. Vibration down to 3 7,739.0 7,741.0 10:00 12:00 - 2.1.5 BPM @ 4956 PSI FS, BHP=3499 12/11/2019 12/11/2019 2.00 SLOT WELLPR UREM T 7741', reaming down. Vibrations at 7,741.0 7,743.2 12:00 14:00 mostly 2's 1.49 BPM @ 4654 PSI FS, BHP=3469. RIW=13.5K. Stalled @ 7742. PUW=28K Get right back to bottom 12/11/2019 12/11/2019 3.20 SLOT WELLPR UREM T 7743' Under reaming, vibrations 7,743.2 7,747.1 14:00 17:12 normal, 1.49 BPM @ 4654 PSI FS, BHP=3462 12/11/2019 12/11/2019 3.80 SLOT WELLPR UREM T 7747', continue reaming down, 7,747.1 7,751.6 17:12 21:00 vibrations at 1-2, 1.48 bpm, annular = 3458 psi, avg ROP = 1.2 fph 12/11/2019 12/12/2019 3.00 SLOT WELLPR UREM T 7751.6, continue reaming down, 7,751.6 7,755.3 21:00 00:00 annular = 3480 psi, pump = 4597 psi, avg ROP = 1.2 fph 12/12/2019 12/12/2019 2.60 SLOT WELLPR UREM T 7755.3', under -reaming down, annular 7,755.3 7,758.5 00:00 02:36 = 3473 psi, pump = 4579 psi, pump 5x5 sweeps 12/12/2019 12/12/2019 1.90 SLOT WELLPR TRIP T POOH to inspect tools & blades, 7,758.5 54.0 02:36 04:30 PUW = 27K, jog at 500', PJSM 12/12/2019 12/12/2019 0.50 SLOT WELLPR PULD T PUD BHA #12 54.0 0.0 04:30 05:00 12/12/2019 12/12/2019 0.70 SLOT WELLPR BHAH T Pull off under reamer and redress 0.0 0.0 05:00 05:42 12/12/2019 12/12/2019 0.90 SLOT WELLPR PULD T PD BHA # 13 with 2 1/8" BOT straight 0.0 54.2 05:42 06:36 motor, and Hailey Under reamer with 4.85 Upper blades / 4.125 lower blades. Make up to coil and surface test. Tag up and set counters 12/12/2019 12/12/2019 1.30 SLOT WELLPR TRIP T Trip in well, EDC open 54.2 7,405.0 06:36 07:54 12/12/2019 12/12/2019 0.30 SLOT WELLPR DLOG T Log formation for -1 foot, PUW=29K, 7,405.0 7,448.0 07:54 08:12 close EDC 12/12/2019 12/12/2019 0.10 SLOT WELLPR TRIP T Continue in well 7,448.0 7,753.0 08:12 08:18 12/12/2019 12/12/2019 2.70 SLOT WELLPR UREM T Bring pumps online, Wash down to 7,753.0 7,761.5 08:18 11:00 7758, Under ream from there, 1.48 BPM @ 4207 PSI FS, BHP=3476 12/12/2019 12/12/2019 3.00 SLOT WELLPR UREM T 7761 Continue reaming down, 1.48 7,761.5 7,765.0 11:00 14:00 BPM @ 4207 PSI FS, BHP=3476, Diff=153 12/12/2019 12/12/2019 1.50 SLOT WELLPR UREM T 7765 Continue reaming down, 1.48 7,765.0 7,766.3 14:00 15:30 BPM @ 4207 PSI FS, BHP=3476 12/12/2019 12/12/2019 0.20 SLOT WELLPR UREM T 7766', Stall, PUW=29K 7,766.3 7,766.0 15:30 15:42 12/12/2019 12/12/2019 1.60 SLOT WELLPR UREM T 7766.3 Under ream, 1.51 BPM @ 7,766.0 7,768.1 15:42 17:18 4440 PSI FS, BHP=3469 Page 13/39 Report Printed: 1/27/2020 - Operations Summary (with Timelog Depths) by 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/12/2019 12/12/2019 2.00 SLOT WELLPR UREM T 7768.1', under -reaming, 1.51 bpm @ 7,768.1 7,769.5 17:18 19:18 4466 psi, annular- 3476 psi, vibrations to 4's, reduces to 1'-2's Stall at 7769.5', PUW = 30K, stall RBIH at 7766'(2X), run through w/ pumps off, back ream up through 7766', clean, stall at 7769.4' getting started on bottom 12/12/2019 12/12/2019 2.40 SLOT WELLPR UREM T Difficulty getting restarted at 7769.5', 7,769.5 7,770.0 19:18 21:42 FS = 1035 psi @ 1.46 bpm, annular = 3455 psi, pump = 4301 psi, vibrations at 4's 12/12/2019 12/12/2019 1.30 SLOT WELLPR UREM T 7770', under -reaming, pump = 4319 7,770.0 7,770.7 21:42 23:00 psi, annular = 3455 psi, reduce speed through perfs to avoid stalling (0.6 fph) Stall at 7770.4' 12/12/2019 12/13/2019 1.00 SLOT WELLPR UREM T PU, stall attempting to get to bottom at 7,770.7 7,770.7 23:00 00:00 7768.8'(2X), run past w/ pumps off clean, stall at 7770.3', slowly work to bottom w/ mutltiple stalls 12/13/2019 12/13/2019 2.00 SLOT WELLPR UREM T Go to 7770.8', bring up pumps to 1.5 7,770.7 7,771.4 00:00 02:00 bpm, back ream at 1 fpm to 7765.1', turn around, continue reaming down, avg ROP = 0.35 fph 12/13/2019 12/13/2019 2.00 SLOT WELLPR UREM T 7771.4', under -reaming, pump = 4420 7,771.4 7,772.6 02:00 04:00 psi, annular = 3492 psi, abg ROP = 0.6 fph 12/13/2019 12/13/2019 2.00 SLOT WELLPR UREM T 7772.6', under -reaming, pump = 4388 7,772.6 7,773.9 04:00 06:00 psi, annualr = 3496 psi 12/13/2019 12/13/2019 2.00 SLOT WELLPR UREM T 7773.9', Under reaming, 1.47 BPM @ 7,773.9 7,776.2 06:00 08:00 3619 PSI FS, BHP=3554 12/13/2019 12/13/2019 0.60 SLOT WELLPR UREM T 7776.2 Under reaming, 1.47 BPM @ 7,776.2 7,777.0 08:00 08:36 4417 PSI FS, BHP=3547 12/13/2019 12/13/2019 0.50 SLOT WELLPR DLOG T 7777 start out of well, logging up, 7,777.0 7,625.0 08:36 09:06 PUW=29K 12/13/2019 12/13/2019 1.50 SLOT WELLPR TRIP T Stop and open EDC, Trip out 7,625.0 54.0 09:06 10:36 12/13/2019 12/13/2019 0.90 SLOT WELLPR PULD T At surface, PUD BHA#13 Swap out 54.0 0.0 10:36 11:30 motor and under reamer Blades out lower 3.125 Upper out @ 4.25" 12/13/2019 12/13/2019 0.90 SLOT WELLPR PULD T PD BHA# 14 with new 1/8 BOT 0.0 54.2 11:30 12:24 straight motor and Hailey under reamer with 6.1" upper blades, 4.75" lower blades. Make up to coil and surface test 12/13/2019 12/13/2019 1.30 SLOT WELLPR TRIP T Trip in well, EDC open 54.2 7,405.0 12:24 13:42 12/13/2019 12/13/2019 0.40 SLOT WELLPR DLOG T Log formation for +15. Clean counter 7,405.0 7,442.0 13:42 14:06 PUH and relog formation for zero correction 12/13/2019 12/13/2019 0.20 SLOT WELLPR TRIP T Continue in well, stop and close EDC 7,442.0 7,650.0 14:06 14:18 @ 7600 12/13/2019 12/13/2019 0.90 SLOT WELLPR UREM T 7650, Bring pumps online 1.48 BPM 7,650.0 7,711.0 14:18 15:12 @ 5250 PSI FS. Start easing down well, Stall @ 7680, Continue to wash down 7711 Heavy vibration 7680 to 7711 12/13/2019 12/13/2019 2.50 SLOT WELLPR UREM T 7711 Ream down, 1.5 BPM @ 5100 7,711.0 7,723.7- 15:12 17:42 PSI FS, BHP=3532. Vibrations @ 3 - 4. Page 14/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (WB) 12/13/2019 12/13/2019 1.80 SLOT WELLPR UREM T 7723.7', reaming down, pump 5136 7,723.7 7,726.9 17:42 19:30 psi, annular = 3589 psi Stall @ 7725.3', 7726.1', 7727.47', 7727.7', continue w/ multiple stalls 12/13/2019 12/13/2019 2.00 SLOT WELLPR UREM T 7726.9', reaming down, pump = 5160 7,726.9 7,728.5 19:30 21:30 psi, continue to encounter multiple stalls making down -hole progres FS = 1400 psi @ 1.5 bpm, slow getting to bottom after stall at 7728.2', vibrations up to 4's, avg ROP = 0.8 fph 12/13/2019 12/13/2019 1.50 SLOT WELLPR UREM T 7728.5', reaming down, pump = 5071 7,728.5 7,731.5 21:30 23:00 psi, attempt to increase speed, sustained vibration of 4's 12/13/2019 12/14/2019 1.00 SLOT WELLPR UREM T 7731.5', reaming down, pump = 4915', 7,731.5 7,733.8 23:00 00:00 2.5 fph, continued significant vibrations (4's to 5's), avg ROP = 2.3 fph 12/14/2019 12/14/2019 2.00 SLOT WELLPR UREM T 7733.8', under -reaming, pump =4917 7,733.8 7,740.9 00:00 02:00 psi, vibrations at 5's (up to 6's for short periods), avg ROP = 3.6 fph 12/14/2019 12/14/2019 3.00 SLOT WELLPR UREM T 7740.9', under -reaming, pump = 4790 7,740.9 7,756.4 02:00 05:00 psi, vibrations at 4's, vibrations drop to 2's at - 7745.5', avg ROP = 5 fph 12/14/2019 12/14/2019 2.30 SLOT WELLPR UREM T 7756.4', under -reaming, pump = 4813 7,756.4 7,762.0 05:00 07:18 psi, vibrations at 2's, Stall @ 7762 12/14/2019 12/14/2019 2.00 SLOT WELLPR UREM T 7762' Restart after stall, 1.52 BPM @ 7,762.0 7,765.0 07:18 09:18 4886 PSI FS, BHP=3621, Vibration @ 2's 12/14/2019 12/14/2019 2.70 SLOT WELLPR UREM T 7765.5. Restart after stall, PUW=30K. 7,765.0 7,767.4 09:18 12:00 1.49 BPM @ 4905 PSI FS, BHP=3667. Stalled again @ 7766.7 12/14/2019 12/14/2019 2.10 SLOT WELLPR TRIP T 7667, PUH Cycle power for DPS, 7,767.4 51.7 12:00 14:06 Open EDC @ 7650, POOH for BOPE test 12/14/2019 12/14/2019 1.60 SLOT WELLPR PULD T Tag up - Space out, PJSM PUD BHA 51.7 0.0 14:06 15:42 #14. Blades out @ 4.5 lower, 5.5" uppers, Lay down BHA. Skid injector to floor. Pull checks. 12/14/2019 12/14/2019 0.70 SLOT WELLPR CTOP P Make up swizzle stic. Jet stack in 0.0 0.0 15:42 16:24 preperation for BOPE test. Roll CT to water 12/14/2019 12/14/2019 0.50 SLOT WELLPR SVRG P Service remaining valves in 0.0 0.0 16:24 16:54 preperation for BOPE test. Valve crew here to service tree 12/14/2019 12/14/2019 0.60 SLOT WHDBOP PRTS P Flood up, shell test 0.0 0.0 16:54 17:30 12/14/2019 12/14/2019 0.50 SLOT WHDBOP BOPE T Begin test following rig testing 0.0 0.0 17:30 18:00 checklist, witnessed by Lou Laubenstein of the AOGCC. Test pressure 250/4000 psi low/high. Difficulty holding high on test #1 (swab 2), call out valve crew to grease, carry on w/ next tests 12/14/2019 12/14/2019 2.50 SLOT WHDBOP BOPE P Continue BOP test (Test pressure 0.0 0.0 18:00 20:30 250/4000 psi low/high.) Valve crew arrives, grease Swab 2 (post test #6), re -test #1, difficulty holding high Page 15/39 Report Printed: 1/27/2020 ' Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/14/2019 12/14/2019 0.60 SLOT WHDBOP BOPE T Re -grease Swab 2, function valve, no 0.0 0.0 20:30 21:06 good on high, re -grease w/ cooler grease, good low/high 12/14/2019 12/15/2019 2.90 SLOT WHDBOP BOPE P Continue with BOP test, accumulator 0.0 0.0 21:06 00:00 draw -down test, & inner reel valve 12/15/2019 12/15/2019 0.50 SLOT WHDBOP BOPE P Complete BOP test / inner reel iron 0.0 0.0 00:00 00:30 All tests passed inspection 12/15/2019 12/15/2019 0.20 SLOT WELLPR PRTS T Plumb in 100 bbl open -top tank to 0.0 0.0 00:30 00:42 tiger -tank line, pressure test hardline & manifold to 1500 psi, good, blow down with air 12/15/2019 12/15/2019 0.70 SLOT WELLPR CIRC T Displace coil to milling fluiid, blow 0.0 0.0 00:42 01:24 down drilling choke 12/15/2019 12/15/2019 0.20 SLOT WELLPR CTOP T Slide back cart, break off nozzle, 0.0 0.0 01:24 01:36 PJSM 12/15/2019 12/15/2019 1.10 SLOT WELLPR PULD T PU & PD BHA#15 Under -Reamer 0.0 0.0 01:36 02:42 (6.1" blades lower & upper), slide in cart, install checks in UQC, check pack -offs, MU to coil, tag up, set counters 12/15/2019 12/15/2019 1.40 SLOT WELLPR TRIP T RIH w/ BHA #15 0.0 54.0 02:42 04:06 12/15/2019 12/15/2019 0.30 SLOT WELLPR PULD T Log HRZ for +1' correction, PUW = 54.0 7,405.0 04:06 04:24 28K 12/15/2019 12/15/2019 0.10 SLOT WELLPR TRIP T Continue RIH, close EDC 7,405.0 7,760.0 04:24 04:30 12/15/2019 12/15/2019 2.50 SLOT WELLPR UREM T Begin under -reaming, FS = 970 psi @ 7,760.0 7,764.2 04:30 07:00 1.5 bpm, pump = 4574 psi Stalled at 7761.5' 12/15/2019 12/15/2019 2.00 SLOT WELLPR UREM T 7764.4, Under reaming, 1.5 BPM @ 7,764.2 7,767.1 07:00 09:00 4182 PSI FS, BHP=3484, Stalled @ 7767, PUW=30K 12/15/2019 12/15/2019 3.00 SLOT WELLPR UREM T 7767.14 Under ream, 1.49 BPM @ 7,767.1 7,768.5 09:00 12:00 4114 PSI FS, BHP=4102 12/15/2019 12/15/2019 3.00 SLOT WELLPR UREM T 7768.5 Under ream, 1.49 BPM @ 7,768.5 7,769.2 12:00 15:00 4150 PSI FS, BHP=3570, RIW=12.5K 12/15/2019 12/15/2019 3.00 SLOT WELLPR UREM T 7769.18, Under ream dowm. 1.51 7,769.2 7,771.2 15:00 18:00 BPM @ 4131 PSI FS,BHP=3586, many stalls at -7770.5', work through 12/15/2019 12/15/2019 3.00 SLOT WELLPR UREM T 7771.2', under -reaming, 1.5 bpm @ 7,771.2 7,773.6 18:00 21:00 435 psi, pump = 4086 psi, annular = 3592 psi, vibrations at 3's to 4's 12/15/2019 12/16/2019 3.00 SLOT WELLPR UREM T 7773.6', under -reaming, 1.5 bpm @ 7,773.6 7,777.3 21:00 00:00 428 psi, pump = 4117 psi, annular = 3610 psi, vibrations at 4's Stall at 7775.3', PU, continue reaming down 12/16/2019 12/16/2019 2.70 SLOT WELLPR UREM T 7777.3', under -reaming, 1.5 bpm @ 7,777.3 7,780.0 00:00 02:42 410 psi, pump = 4025 psi, annular = 3606 psi Pump sweeps (await to exit bit), trip to inspect tools/blades, open EDC 12/16/2019 12/16/2019 1.90 SLOT WELLPR TRIP T POOH, pumping 1.8 bpm, jog from 7,780.0 54.0 02:42 04:36 500', significant cement & metal returns unload from -500' (partially packing off choke), returns clear up, PJSM 12/16/2019 12/16/2019 1.00 SLOT WELLPR PULD T PUD BHA#15 Blades out @ 5.875 54.0 0.0 04:36 05:36 1 1 1each Page 16139 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur(hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/16/2019 12/16/2019 0.80 SLOT WELLPR PULD T PD BHA#16 with 6.0 X 6.0 blades and 0.0 54.2 05:36 06:24 re run D-331 2.79" no go. Make up to coil and surface test. Tag up and set counters 12/16/2019 12/16/2019 1.30 SLOT WELLPR TRIP T Trip in hole, BHA #16. EDC open 54.2 7,405.0 06:24 07:42 12/16/2019 12/16/2019 0.20 SLOT WELLPR DLOG T Log HRZ for -1', PUW=27K, 7,405.0 7,450.0 07:42 07:54 12/16/2019 12/16/2019 0.10 SLOT WELLPR TRIP T Continue in well, Close EDC @ 7624 7,450.0 7,643.0 07:54 08:00 12/16/2019 12/16/2019 1.10 SLOT WELLPR UREM T Stop, Bring pumps on 1.5 BPM @ 7,643.0 7,770.0 08:00 09:06 4967 PSI FS, BHP=3490. Stall @ 7647. P/U and restart. High vibrations @ 6's 12/16/2019 12/16/2019 2.90 SLOT WELLPR UREM T 7770 Stall, P/U and restart 1.49 @ 7,770.0 7,776.0 09:06 12:00 4332 PSI FS BHP=3514, Stalled multiple times 7770 to 7772 12/16/2019 12/16/2019 2.10 SLOT WELLPR UREM T 7776 Stall and reset, PUW=28K, 1.49 7,776.0 7,780.0 12:00 14:06 BPM @ 4330 PSI FS, BHP=3587 12/16/2019 12/16/2019 0.70 SLOT WELLPR UREM T 7780' Start reaming uphole @ 3 FPM, 7,780.0 7,780.0 14:06 14:48 PUW=29K. Ream up to 7755 turn around back to 7780 mostly clean 12/16/2019 12/16/2019 0.30 SLOT WELLPR UREM T 7780 Back ream up , PUW=28K 7,780.0 7,720.0 14:48 15:06 12/16/2019 12/16/2019 0.40 SLOT WELLPR UREM T 7720 Ream down, RIW 12.9K, Stall @ 7,720.0 7,780.0 15:06 15:30 7726. P/U and ream right through 12/16/2019 12/16/2019 1.00 SLOT WELLPR UREM T Pump sweeps, Ream up to 7635 7,780.0 7,780.0 15:30 16:30 waiting on sweeps 12/16/2019 12/16/2019 2.00 SLOT WELLPR TRIP T POOH chasing sweeps, PUW=29K, 7,780.0 54.0 16:30 18:30 PJSM 12/16/2019 12/16/2019 0.80 SLOT WELLPR PULD T PUD BHA#16, blades came out 54.0 0.0 18:30 19:18 6"/5.75" top/bottom, mill came out 2.78" no-go 12/16/2019 12/16/2019 1.00 SLOT WELLPR CIRC T MU nozzle, jet stack, flush micro- 0.0 0.0 19:18 20:18 motion, PU test jnt, function rams 12/16/2019 12/16/2019 0.50 SLOT WELLPR PULD T PJSM, PU BHA#17 HES Caliper 0.0 22.0 20:18 20:48 Plan: Log CCL 7775' to 7550', Log CCL HRZ to 7770' 12/16/2019 12/16/2019 0.30 SLOT WELLPR TRIP T RIH w/ BHA#17, noisy data from 22.0 270.0 20:48 21:06 caliper on RIH, pause at 269', HES trouble -shoots issue, unable to resolve, POOH for new tools 12/16/2019 12/16/2019 0.20 SLOT WELLPR TRIP T Trip to surface, tag up, PJSM 270.0 22.0 21:06 21:18 12/16/2019 12/16/2019 0.40 SLOT WELLPR PULD T LD BHA #17 22.0 0.0 21:18 21:42 12/16/2019 12/16/2019 1.10 SLOT WELLPR PULD T MU new caliper, PU BHA#18 HES 0.0 0.0 21:42 22:48 Caliper, unable to connect to caliper, trouble -shoot, no good, LD tools, test tools on rig floor 12/16/2019 12/16/2019 0.40 SLOT WELLPR WAIT T HES tech gathering & bringing 0.0 0.0 22:48 23:12 addiontal tools while hands at rig continue to trouble shoot tool issue Decsion made to PU & run dummy run while HES brings new tools to rig, clear rig floor of both calipers 12/16/2019 12/17/2019 0.80 SLOT WELLPR PULD T Load PDL, begin PD BHA#18 Dummy 0.0 62.0 23:12 00:00 1 I I Pilot -Hole Assembly Page 17/39 Report Printed: 1/27/2020 _ Etr Operations Summary (with Timelog Depths) _Z 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/17/2019 12/17/2019 0.10 SLOT WELLPR PULD T Complete PD BHA #18 Dummy 0.0 62.0 00:00 00:06 Assembly, slide in cart, check pack - offs, MU to coil, tag up, set counters 12/17/2019 12/17/2019 1.40 SLOT WELLPR TRIP T RIH w/ BHA #18 62.0 7,415.0 00:06 01:30 12/17/2019 12/17/2019 0.30 SLOT WELLPR DLOG T Log HRZ for +2' correction, PUW = 7,415.0 7,463.0 01:30 01:48 29K, close EDC, enable CCL 12/17/2019 12/17/2019 0.30 SLOT WELLPR DLOG T CCL from HRZ to 7751' 7,463.0 7,753.0 01:48 02:06 12/17/2019 12/17/2019 0.20 SLOT WELLPR TRIP T Test interference per DD, RIH to 7,753.0 7,770.0 02:06 02:18 7782', stack out attempting to enter pilot -hole (3X) No interference down to 7782' 12/17/2019 12/17/2019 0.70 SLOT WELLPR DISP T Displace to new mud system, log K1 7,770.0 7,770.0 02:18 03:00 for +3' correction Paint tubing -tail flag at 7661.95' (yellow) 12/17/2019 12/17/2019 1.60 SLOT WELLPR TRIP T POOH, tag up 7,770.0 62.0 03:00 04:36 Perform injectivity test: shut choke, pressure up to 1056 psi, shut down pumps, drops to 1054 psi in 10 min, PJSM 12/17/2019 12/17/2019 SLOT WELLPR PULD T PUD BHA #18 62.0 0.0 04:36 04:36 12/17/2019 12/17/2019 1.40 SLOT WELLPR PULD T PU BHA #19 HES Caliper 0.0 22.0 04:36 06:00 12/17/2019 12/17/2019 1.50 SLOT WELLPR TRIP T Trip in well, 22.0 7,661.0 06:00 07:30 12/17/2019 12/17/2019 0.10 SLOT WELLPR DLOG T Log K1 tie in for +.5' 7,661.0 7,661.0 07:30 07:36 12/17/2019 12/17/2019 0.10 SLOT WELLPR TRIP T Continue in well 7,661.0 7,775.0 07:36 07:42 12/17/2019 12/17/2019 0.60 SLOT WELLPR DLOG T 7775'. Open fingers, Log up to 7548. 7,775.0 7,623.0 07:42 08:18 Close fingers. RBIH to 7775 and repeat logging pass up, Stop and paint flag 7623 12/17/2019 12/17/2019 1.30 SLOT WELLPR TRIP T 7623 Trip out BHA #19 7,623.0 15.0 08:18 09:36 12/17/2019 12/17/2019 0.30 SLOT WELLPR PULD T Lay down BHA #19 15.0 0.0 09:36 09:54 12/17/2019 12/17/2019 0.60 SLOT WELLPR SFTY T PJSM with HES cementers, Vac truck 0.0 0.0 09:54 10:30 drivers, and rig personnel 12/17/2019 12/17/2019 0.70 SLOT WELLPR PULD T Pull checks, M/U BHA#20. Stab on 0.0 15.4 10:30 11:12 well 12/17/2019 12/17/2019 1.60 SLOT WELLPR TRIP T RIH BHA#20 15.4 7,615.0 11:12 12:48 12/17/2019 12/17/2019 0.10 SLOT WELLPR DLOG T At flag, 0 correction 7,615.0 7,615.0 12:48 12:54 12/17/2019 12/17/2019 1.10 SLOT WELLPR TRIP T Continue in to 7775, PUW=27K, Batch 7,615.0 7,775.0 12:54 14:00 up cement. Time starts @ 13:23 12/17/2019 12/17/2019 0.40 SLOT WELLPR PRTS T Pressure test cementer to 4900 PSI 7,775.0 7,775.0 14:00 14:24 12/17/2019 12/17/2019 1.10 SLOT WELLPR CMNT T Cementers online, .5 BPM 5 BBI water 7,775.0 7,775.0 14:24 15:30 spacer, 10 BBIs 16.5 LB/Gal cement followed by 7 MIS fresh water 12/17/2019 12/17/2019 1.20 SLOT WELLPR CMNT T Shut down cementers and isolate. 7,775.0 7,775.0 15:30 16:42 Come on with rig pump with 20 BBI Hi vis pill. .5 BPM @ 2427 PSI pump pressure Page 18/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/17/2019 12/17/2019 0.30 SLOT WELLPR CMNT T 2.2 BBIs cement out of coil. Start 7,775.0 7,000.0 16:42 17:00 laying it in 13 FPM, .5 BPM, PUW28K go to 57 FPM @ 7614. 7230 pull to safety @ 100 FPM 12/17/2019 12/17/2019 1.30 SLOT WELLPR CIRC T At safety, Pump 2 BPM circulate 7,000.0 6,990.0 17:00 18:18 Bottoms up. See slight bit of cement coming up in returns. Out micro briefly up to 10.4 PPG 12/17/2019 12/17/2019 0.20 SLOT WELLPR TRIP T Wash down to to 7565'. Estimate 6,990.0 7,565.0 18:18 18:30 TOC @ 7570. PUH slowly until 10 BBIs out of coil 12/17/2019 12/17/2019 1.70 SLOT WELLPR TRIP T POOH chasing contaminated cement 7,565.0 15.0 18:30 20:12 12/17/2019 12/17/2019 0.30 SLOT WELLPR PULD T At surface. Shut in well with 600 PSI 15.0 0.0 20:12 20:30 on it. Lay down cementing BHA#20 12/17/2019 12/17/2019 0.20 SLOT WELLPR CTOP T Test E -Line - Good test, Make up 0.0 0.0 20:30 20:42 Nozzle 12/17/2019 12/17/2019 1.80 SLOT WELLPR CIRC T Stab on injector. Circulate 50 BBI 0.0 0.0 20:42 22:30 black water pill to flush rig surface equipment 12/17/2019 12/17/2019 0.50 SLOT WELLPR CTOP T Break off nozzle, clear rig floor 0.0 0.0 22:30 23:00 12/17/2019 12/18/2019 1.00 SLOT WELLPR CTOP T Open ram doors, begin inspecting 0.0 0.0 23:00 00:00 rams, replace door seals 12/18/2019 12/18/2019 3.00 SLOT WELLPR CTOP T Continue inspecting rams, & replace 0.0 0.0 00:00 03:00 door seals, changed out UQC, pressure test UQC, flood up stack, pressure test, lower 2" doors leaking, pull & replace door seals Await cement cure time 12/18/2019 12/18/2019 1.50 SLOT WELLPR CTOP T Re -pressure test stack, (low 250, high 0.0 0.0 03:00 04:30 4000), pressure dropping, trouble shoot, re -test hi/low, good test 12/18/2019 12/18/2019 1.10 SLOT WELLPR PULD T PJSM, PD BHA#21 Pilot -Hole 0.0 72.0 04:30 05:36 Assembly (spacer pup & 2.80" D331 smooth gauge mill), slide in cart, check pack -offs, MU to coil, tag up, set counters OD EDC @ 2.36" 12/18/2019 12/18/2019 1.40 SLOT WELLPR TRIP T RIH w/ BHA #21 72.0 7,425.0 05:36 07:00 12/18/2019 12/18/2019 0.20 SLOT WELLPR DLOG T Log HRZ for -1.5' correction, close 7,425.0 7,470.0 07:00 07:12 EDC, PUW = 25K 12/18/2019 12/18/2019 1.00 SLOT WELLPR TRIP T Continue RIH to 7595', no cement tag, 7,470.0 7,610.0 07:12 08:12 PU, confer w/town, decision made to RIH to 7610', do not find TOC, PUH, circulate bottoms up 12/18/2019 12/18/2019 1.50 SLOT WELLPR WAIT T Re -log HRZ +0.5' (while circulating 7,610.0 7,445.0 08:12 09:42 bottoms up), continue circualting awaiting plan forward, appear to have green cement over shakers 12/18/2019 12/18/2019 1.30 SLOT WELLPR DLOG T Stopt at 7450', shut down pumps to 7,445.0 7,450.0 09:42 11:00 record bottom hole temp over time, temp climbs from 122°F to 136°F over 1 hr 15 min HES is sending rep to PU cement sample left at the rig. Water sample is being pulled in clean container from wash -bay Page 19/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) s, 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 12/18/2019 12/18/2019 0.60 SLOT WELLPR WAIT T Continue circulating, awaiting HES to 7,450.0 7,450.0 11:00 11:36 rig to pickup cement sample Decsion made RIH pumping full rate looking for TOC 12/18/2019 12/18/2019 1.10 PROD1 RPEQPT MILL T RIH, pumping 1.9 bpm, 10 fpm, tag 7,450.0 7,648.0 11:36 12:42 TOC at 7636', mill to 7637', -200 psi motorwork, PU & circulate bottoms up (taking "green" cement to 100 bbl open -top), mill to 7648', 2.5K WOB, 500 psi motorwork, 95 fph, PUW = 25K, circulate cutting up -hole (take slug to open -top tank) 12/18/2019 12/18/2019 1.00 PROD1 RPEQPT MILL T Milling, FS = 496 psi @ 1.9 bpm, stall 7,648.0 7,652.0 12:42 13:42 at 7649' (2X), difficulty getting started at 7652' (multiple stalls), PUW's 25K, unable to get started at 7652', PUH, annular climbing to 3931 psi, packing off, circulate below TT 12/18/2019 12/18/2019 2.30 PROD1 RPEQPT MILL T RBIH, FS = 450 psi @ 1.8 bpm, see 7,652.0 7,697.0 13:42 16:00 WOB at 7650', continue to have difficulty getting started, begin taking 1/10's (7650' is bottom) Roll bit to LS to get by 7650', bet by, roll back to 20° ROHS 12/18/2019 12/18/2019 0.30 PROD1 RPEQPT MILL T Milling, FS = 450 psi @ 1.8 bpm, dp = 7,697.0 7,716.0 16:00 16:18 984 psi, ROP = 60 fph, WOB = 2.2K 12/18/2019 12/18/2019 0.20 PROD1 RPEQPT WPRT T Wiper to TT, PUW = 28K 7,716.0 7,716.0 16:18 16:30 12/18/2019 12/18/2019 1.50 PROD1 RPEQPT MILL T Milling, FS = 450 psi @ 1.8 bpm, 7,716.0 7,729.0 16:30 18:00 pump = 4367 psi 12/18/2019 12/19/2019 6.00 PROD1 RPEQPT MILL T Milling, FS = 450 psi @ 1.8 bpm, OBM 7,729.0 7,745.0 18:00 00:00 pump = 4910 psi, WH 177 psi, IA 945 psi, OA 719 psi. ROP variab13 0- 5 ft/hr stall, 7730.6' PU 30 k lbs stall, 7734.6' PU 30 k lbs stall, 7734.8' PU 31 k lbs 12/19/2019 12/19/2019 5.00 PROD1 RPEQPT MILL T Continue to mill ahead. 7,745.0 7,762.5 00:00 05:00 CT 4994 psi @ 1.83 bpm in/out. BHP 3486 psi, CT Wt 12 k lbs, WOB 0.5 k lbs, ROP variable 0 - 6 ft/hr, WH 150 psi, IA 959 psi, OA 802 psi 7759.44' PU Wt 31 k lbs 7759.44' PU Wt 32 k lbs 7762' PU Wt 30 k lbs 12/19/2019 12/19/2019 2.50 PROD1 RPEQPT MILL T Milling, FS = 450 psi @ 1.8 bpm, 7,762.5 7,764.6 05:00 07:30 pump 4926 psi, ROP variable 1-6 fph, stall at 7763.9' 12/19/2019 12/19/2019 3.00 PROD1 RPEQPT MILL T Milling, 1.8 bpm, pump = 4717 psi, dp 7,764.6 7,768.6 07:30 10:30 = 710 psi, PUH to tubing -tail, PUW = 30K Multiple stalls at 7768.5' 12/19/2019 12/19/2019 2.20 PROD1 RPEQPT MILL T Milling, 0.9K WOB, pump = 4706, dp = 7,768.6 7,769.5 10:30 12:42 714 psi, extremly low ROP, -0.4 fph, stall at 7769', PUW = 32K, stall at 7769.5', avg ROP = 0.41 fph 12/19/2019 12/19/2019 1.30 PROD1 RPEQPT MILL T Milling, continued low ROP, struggling 7,769.5 7,769.9 12:42 14:00 to make footage, 1.8 bpm, pump = 4644 psi, stall at 7769.7', bead up hiVis pill pit, pump 7x7 beades sweeps, stall 7769.9, PUW = 32K Page 20/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/19/2019 12/19/2019 2.00 PROD1 RPEQPT MILL T Short wiper awaiting beaded sweeps 7,769.9 7,771.5 14:00 16:00 to bit, able to keep WOB with reduced stalling Mlling, FS = 465 psi @1.8 bpm, pump 4653 psi, milling "break" at 7770', stall at 7770', 7770.2', PUW = 32K 7770.68', roll to LS for 0.1', WOB drops off, ROP increased, roll back to 20° ROHS, stall at 7771.1', pump beaded sweeps 12/19/2019 12/19/2019 7.50 PROD1 RPEQPT MILL T Milling, FS = 465 psi @ 1.8 bpm, 7,771.5 7,782.0 16:00 23:30 pump = 4722 psi, at 7771.6' roll LS for 0.1', roll back to 20°, stall 7772.5' 12/19/2019 12/19/2019 0.10 PROD1 RPEQPT REAM P TD Pilot hole. Pull back ream pass #1 7,782.0 7,626.0 23:30 23:36 as milled, 20° ROHS, 5 ft/min for 10' at 7646'-7636'. 12/19/2019 12/19/2019 0.30 PROD1 RPEQPT DLOG P PUH and tie into the HRZ for a +2' 7,626.0 7,488.6 23:36 23:54 correction 12/19/2019 12/20/2019 0.10 PROD1 RPEQPT TRIP P RBIH, dry drift TOC transition - clean! 7,488.6 7,657.0 23:54 00:00 12/20/2019 12/20/2019 0.10 PROD1 RPEQPT TRIP P Continue in hole 7,657.0 7,784.0 00:00 00:06 Confirm bottom @ 7784'- Paint flag, PU 32 k lbs 12/20/2019 12/20/2019 0.90 PROD1 RPEQPT REAM P PUH, performe 2 nd back ream pass, 7,784.0 7,573.6 00:06 01:00 as milled, 20° ROHS, 5 ft/min for 10' at 7646'-7636'. Pull two back reaming passes at 200 °ROHS. Dry drift clean Paint flag @ 7573.64' Open EDC, Flow check - Fail 12/20/2019 12/20/2019 1.50 PROD1 RPEQPT TRIP P POOH pumping 1.82 bpm holding 7,573.6 72.0 01:00 02:30 11.3 EMW at TD. Jog at 500' 12/20/2019 12/20/2019 1.20 PROD1 RPEQPT PULD P PJSM, Bump up, space out, checks 72.0 0.0 02:30 03:42 not holding, PUD BHA#21 following failed checks procedure. "` Mill graded out 2.79" No Go 12/20/2019 12/20/2019 0.80 PROD1 RPEQPT CIRC P Stab injector, jet stack, unstab injector. 0.0 0.0 03:42 04:30 12/20/2019 12/20/2019 0.90 PROD1 RPEQPT PULD P PU BHA # 22, HES 24 arm caliper. 0.0 22.0 04:30 05:24 12/20/2019 12/20/2019 1.60 PROD1 RPEQPT TRIP P RIH w/ BHA #22 22.0 7,400.0 05:24 07:00 12/20/2019 12/20/2019 0.20 PROD1 RPEQPT DLOG P Log HRZ for -1.38' correction 7,400.0 7,432.0 07:00 07:12 12/20/2019 12/20/2019 0.40 PROD1 RPEQPT TRIP P Cotinue RIH, slow by TOC at 7636', 7,432.0 7,780.0 07:12 07:36 clean 12/20/2019 12/20/2019 0.20 PROD1 RPEQPT DLOG P Log 7780' to 7550' 7,780.0 7,550.0 07:36 07:48 12/20/2019 12/20/2019 0.20 PROD1 RPEQPT TRIP P Close caliper arms, RBIH 7,550.0 7781.0 07:48 08:00 12/20/2019 12/20/2019 0.20 PROD1 RPEQPT DLOG P Log 7781' to 7550' 7,781.0 7,750.0 08:00 08:12 12/20/2019 12/20/2019 1.40 PROD1 RPEQPT TRIP P Close caliper arms, POOH, PJSM 7,750.0 22.0 08:12 09:36 12/20/2019 12/20/2019 0.40 PROD1 RPEQPT PULD P LD BHA #22 22.0 0.0 09:36 10:00 12/20/2019 12/20/2019 0.70 PROD1 RPEQPT WAIT P Recieve & evaluate caliper data, load 0.0 0.0 10:00 10:42 WS on rig Page 21/39 Report Printed: 1/27/2020 y' Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (MB) End Depth (WB) 12/20/2019 12/20/2019 1.40 PROD1 RPEQPT PULD P PD BHA#23 Whipstock, break down 0.0 72.0 10:42 12:06 BHA in PDL, open EDC, carry on w/ PD Slide in cart, check pack -offs, MU to coil, tag up, set counters 12/20/2019 12/20/2019 1.30 PROD1 RPEQPT TRIP P RIH w/ BHA#23 72.0 7,425.0 12:06 13:24 12/20/2019 12/20/2019 0.40 PROD1 RPEQPT DLOG P Log HRZ for -1' correction, continue 7,425.0 7,641.0 13:24 13:48 RIH to log K1, PUW = 30K, pumps off, close EDC, log K1 for +1' correction 12/20/2019 12/20/2019 0.30 PROD1 RPEQPT WPST P Continue RIH, arrive at set depth, 7,641.0 7,772.0 13:48 14:06 bring up pumps & PU off WS, TOWS -7762', oriented HS, set down 4K WOB, good set 12/20/2019 12/20/2019 1.40 PROD1 RPEQPT TRIP P POOH, close EDC, PJSM 7,772.0 62.0 14:06 15:30 12/20/2019 12/20/2019 0.80 PROD1 RPEQPT PULD P PUD BHA #23 62.0 0.0 15:30 16:18 12/20/2019 12/20/2019 0.60 PROD1 WHPST PULD P PD BHA#24 Window Assembly (0.6° 0.0 74.7 16:18 16:54 AKO motor, new 2.80" string reamer, & 2.80" window mill) 12/20/2019 12/20/2019 1.40 PROD1 WHPST TRIP P Bump up, RIH, Park @ 7755', close 74.7 7,620.0 16:54 18:18 EDC, RIH 12/20/2019 12/20/2019 0.20 PROD1 WHPST DLOG P Log K1 for 0' correction. 7,620.0 7,646.1 18:18 18:30 12/20/2019 12/20/2019 0.40 PROD1 WHPST TRIP P Continue in hole, dry tag TOWS @ 7,646.1 7,763.0 18:30 18:54 7,763', CT Wt 11.8 k lbs, WOB 3 klbs, PU 31 k lbs PUH, set rate RBIH 12/20/2019 12/20/2019 1.40 PROD1 WHPST MILL P CT 4861 psi, BHP 3435 psi, Free spin 7,763.0 7,762.0 18:54 20:18 diff 471 psi. Stall 7 times, 7762.10 - 7762.18' tryed varying RIH speed down to as low as 0.5 ft/hr. 12/20/2019 12/20/2019 1.40 PROD1 WHPST MILL P Reduce rate to 1.52 bpm, CT 3754 psi 7,762.0 7,763.0 20:18 21:42 @ 1.53 bpm, BHP 3438 psi, Free spin 331 psi. Mill ahead 12/20/2019 12/21/2019 2.30 PROD1 WHPST MILL P Increase rate to 1.89 bpm, CT 4888 7,763.0 7,765.5 21:42 00:00 psi, BHP 3443 psi, Milling ahead, CT 10.2 k lbs, WOB 0.08 k lbs, ROP 1 ft/hr 12/21/2019 12/21/2019 2.30 PROD1 WHPST MILL P Contiune to mill exit window in 7" 7,765.5 7,768.4 00:00 02:18 Observe drop in WOB, mill off at bottom of window - 7768.4' 12/21/2019 12/21/2019 2.20 PROD1 WHPST MILL P Mill ahead, 11.8 k lbs CT Wt 0.1 k 7,768.4 7,772.0 02:18 04:30 WOB 7768.62' incresae ROP from 1 ft/hr to 1.5 ft/hr 12/21/2019 12/21/2019 0.50 PROD1 WHPST MILL P CT 4942 psi @ 1.89 bpm, BHP 3448 7,772.0 7,777.0 04:30 05:00 psi, Start drilling ahead. CT wt 9.5 lbs, WOB 2.56 k lbs, ROP 9 ft/hr TOWS = 7762', BOW = 7768.4' 12/21/2019 12/21/2019 0.70 PROD1 WHPST MILL P TD rat -hole at 7783' 7,777.0 7,783.0 05:00 05:42 12/21/2019 12/21/2019 1.90 PROD1 WHPST REAM P Perform reaming passes, HS, 30R, 7,783.0 7,783.0 05:42 07:36 30L, & LS Dry drift window up & down, clean, pump 5x5 sweeps 12/21/2019 12/21/2019 1.90 PROD1 WHPST TRIP P Open EDC, await sweeps to bit, 7,783.0 74.0 07:36 09:30 1 1 1 POOH Page 22/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (WB) 12/21/2019 12/21/2019 0.60 PROM WHPST PULD P PJSM, PUD BHA#24, string reamer & 74.0 0.0 09:30 10:06 mill came out 2.80" no-go 12/21/2019 12/21/2019 0.60 PROD1 DRILL CIRC P Blow down motor, MU nozzle, jet 0.0 0.0 10:06 10:42 stack, blow down micro -motion, break off nozzle 12/21/2019 12/21/2019 1.00 PROM DRILL PULD P PD BHA#25 Build Assembly (2.3° 0.0 72.0 10:42 11:42 AKO motor, RB Hughes bit), slide in cart, check pack -offs, MU to coil, tag up, set counters 12/21/2019 12/21/2019 1.50 PROM DRILL TRIP P RIH w/ BHA #25, close EDC 72.0 7,615.0 11:42 13:12 12/21/2019 12/21/2019 0.10 PROM DRILL DLOG P Log K1 for 0' correction 7,615.0 7,631.0 13:12 13:18 12/21/2019 12/21/2019 0.20 PROD1 DRILL TRIP P Continue RIH, clean through top of 7,631.0 7,783.0 13:18 13:30 pilot -hole, PUW = 32K, clean through window 12/21/2019 12/21/2019 0.70 PROM DRILL DRLG P Drilling, FS = 755 psi @ 1.9 bpm, 7,783.0 7,853.0 13:30 14:12 CWT = 9.9K @ 0.7K WOB, annular = 3618 psi, WHP = 293 psi, pump = 5475 psi Stall at 7790', PUW = 32K, PUW 35K from 7853' Swap to new mud system #2, hits bit @ 7843' 12/21/2019 12/21/2019 0.70 PROD1 DRILL DRLG P Drilling, reduce to 1.6 bpm, put more 7,853.0 7,917.0 14:12 14:54 WOB in attempt to build inclination, CWT = 9.7K @ 3.2K WOB, annular = 3599 psi, PUW = 29K 12/21/2019 12/21/2019 0.30 PROM DRILL WPRT P PUH for DD to log K1, LD ODS tools 7,917.0 7,615.0 14:54 15:12 12/21/2019 12/21/2019 0.30 PROD1 DRILL DLOG P Log K1 for +1' correction, RBIH 7,615.0 7,850.0 15:12 15:30 Log RA at 7770', TOWS = 7763', BOW = 7769.4' 12/21/2019 12/21/2019 0.10 PROD1 DRILL TRIP P RBIH to drill 7,850.0 7,917.0 15:30 15:36 12/21/2019 12/21/2019 2.40 PROM DRILL DRLG P Drilling, FS = 544 psi @ 1.6 bpm, 7,917.0 8,069.0 15:36 18:00 CWT = 9.2K @ 1 K WOB, annular = 3659 psi, WHP = 353 psi, pump = 4523 psi 12/21/2019 12/21/2019 2.60 PROD1 DRILL DRLG P Drilling, CT 4426 psi @ 1.6 bpm, BHP 8,069.0 8,219.0 18:00 20:36 3670 psi. WH 324 psi, IA 936 psi, OA 667 psi. CWT = 7.9K @ 1.9K WOB. 12/21/2019 12/21/2019 0.20 PROM DRILL WPRT P PU Wt 31 k lbs, Pull 200' wiper, RBIH 8,219.0 8,219.0 20:36 20:48 12/21/2019 12/21/2019 1.40 PROM DRILL DRLG P CT 4205 psi @ 1.6 bpm, BHP 8,219.0 8,341.0 20:48 22:12 3664psi, free spin 586 psi. WH 302 psi, CWT = 4.2k @ 3.0 k WOB. 12/21/2019 12/21/2019 0.70 PROM DRILL WPRT P PU Wt 31 k lbs, POOH on swab wipe. 8,341.0 7,603.0 22:12 22:54 Build TD'd. Saw -1.5k WOB tugs starting @ 8002'. High bend motor @ 90 ° ROHS when as drilled was 270° ROHS. RBIH to 8050', PUH, window, pilot hole clean, Park and open EDC 12/21/2019 12/22/2019 1.10 PROD1 DRILL TRIP P Continue to POOH. 7,603.0 1,476.0 22:54 00:00 12/22/2019 12/22/2019 0.40 PROM DRILL TRIP P Continue to POOH, PJSM, tag up, 1,476.0 70.1 00:00 00:24 space out. 12/22/2019 12/22/2019 1.20 PROM DRILL PULD P PUD BHA#25, build drilling assembly. 70.1 0.0 00:24 01:36 Page 23/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/22/2019 12/22/2019 0.20 PROM DRILL BOPE P BOPE Function test 0.0 0.0 01:36 01:48 12/22/2019 12/22/2019 1.10 PROD1 DRILL PULD P PD BHA #26, ERD A lat drilling 0.0 78.3 01:48 02:54 assembly, 0.6° AKO w A3 Hyc bit and fresh NOV agitator 12/22/2019 12/22/2019 1.50 PROM DRILL TRIP P RIH, park @ 500, close EDC, shallow 78.3 7,620.0 02:54 04:24 test agitator - good, continue in hole 12/22/2019 12/22/2019 0.20 PROD1 DRILL DLOG P Tie into the K1 for -1' correction 7,620.0 7,640.8 04:24 04:36 12/22/2019 12/22/2019 0.60 PROM DRILL TRIP P Continue to RIH. 7,640.8 8,341.0 04:36 05:12 12/22/2019 12/22/2019 2.40 PROM DRILL DRLG P Drilling, FS = 1087 psi @ 1.87 bpm, 8,341.0 8,622.0 05:12 07:36 CWT = 9K @ 1.4K WOB, annular = 3665 psi, WHP = 303 psi, pump = 5660 psi Pump efficiency down, aired up mud, add ScreenKlean, 220 fph max when continuously oscillating 12/22/2019 12/22/2019 0.40 PROM DRILL DRLG P PUW = 27K from 8622', Drilling, FS = 8,622.0 8,654.0 07:36 08:00 1160 psi @ 1.9 bpm, CWT = 3.8K @ 1 K WOB, annular = 3716 psi, WHP = 257psi, pump = 5700 psi Snubbing -4 CWT, pump sweeps, pull early wiper trip 12/22/2019 12/22/2019 0.70 PROM DRILL WPRT P Wiper up-hole, PUW = 29K, jog build, 8,654.0 7,615.0 08:00 08:42 clean through build, jog 7" casing, clean 12/22/2019 12/22/2019 0.10 PROM DRILL DLOG P Log K1 for+1' correction 7,615.0 7,644.0 08:42 08:48 12/22/2019 12/22/2019 0.40 PROM DRILL WPRT P Wiper in-hole, clean past TOC & 7,644.0 8,654.0 08:48 09:12 through window, RIW = 1O 12/22/2019 12/22/2019 2.20 PROM DRILL DRLG P Drilling, FS = 1192 psi @ 1.9 bpm, 8,654.0 8,803.0 09:12 11:24 CWT = 3.53K @ 1.65K WOB, annular = 3694 psi, WHP = 265 psi, pump = 5923 psi, quickly go back to snubbing up to -7K Pump 10 bbl beads, improved weight transfer, pump addional 10 bbl to good effect, avg ROP = 68 fph 12/22/2019 12/22/2019 2.80 PROM DRILL DRLG P Drilling, CWT = 5.4K @ 1.4K WOB, 8,803.0 9,054.0 11:24 14:12 annular = 3743 psi, WHP = 155 psi, pump = 5861 psi Continue to pump beaded pills built from the active 12/22/2019 12/22/2019 0.20 PROM DRILL WPRT P Wiper up-hole, PUW = 27K 9,054.0 8,350.0 14:12 14:24 12/22/2019 12/22/2019 0.30 PROM DRILL WPRT P Wiper in-hole, RIW = 7K 8,350.0 9,054.0 14:24 14:42 12/22/2019 12/22/2019 2.10 PROM DRILL DRLG P Drilling, FS = 1160 psi, @ 1.87 bpm, 9,054.0 9,282.0 14:42 16:48 CWT = 3.4K @ 1.3K WOB, annular = 3720 psi, WHP = 203 psi, pump = 5915 psi, 200' wiper from 9282', PUW = 28K Continue pumping beads 12/22/2019 12/22/2019 2.30 PROM DRILL DRLG P Drilling, FS = 1232 psi, @ 1.87 bpm, 9,282.0 9,483.0 16:48 19:06 CWT = 6.6K @ 1 K WOB, annular = 3753 psi, WHP = 149 psi, pump = 6056 psi Page 24/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/22/2019 12/22/2019 0.30 PROM DRILL WPRT P PU 29 k lbs, Wiper trip #2 - 1000' 9,483.0 8,478.0 19:06 19:24 12/22/2019 12/22/2019 0.40 FROM DRILL WPRT P PU 29 k lbs, RBIH 8,478.0 9,483.0 19:24 19:48 8670' slight set down 12/22/2019 12/23/2019 4.20 PROM DRILL DRLG P CT 5823 psi @ 1.86 in/out, BHP 3791 9,483.0 9,676.0 19:48 00:00 psi, targeting 11.8 ppg EMW at the window, 12.26 ppg @ the bit. Free spin 1148 psi, WH 243 psi, IA 963 psi, OA 792 psi. CT -4.6 k lbs, WOB 1 k lbs. 9514' returns fell from 78 gpm to 20 gpm, Picked up, RBIH, losses healed rapidly 9,594' PU Wt 34 k lbs 9,596' PU Wt 34 k lbs 9,623' PU Wt 38 k lbs 9677' PU Wt 37 k lbs 12/23/2019 12/23/2019 0.70 PROM DRILL DRLG P Drilling, CT 5868 psi, BHP 3786 psi, 9,676.0 9,703.0 00:00 00:42 CT Wt -5 k lbs, WOB 0.78 k lbs. 9,683' PU Wt 35 k lbs. 12/23/2019 12/23/2019 0.80 PROD1 DRILL WPRT P PU Wt 29 k lbs - pull long wiper to 9,703.0 7,716.0 00:42 01:30 window for tie in. 12/23/2019 12/23/2019 0.10 PROM DRILL DLOG P Tie into the K1 for a +3.5' correction. 7,716.0 7,636.6 01:30 01:36 12/23/2019 12/23/2019 0.40 PROM DRILL DLOG P RIH to 7716.17' MD, 5842.52' TVD 7,636.6 7,716.0 01:36 02:00 Trap 3660 psi - 12 ppg EMW observe pressure bleed stedily to 3480 psi in 7 minutes - 11.45 ppg EMW open choke bleed pressure to 3414 psi - 11.24 EMW. Obsery pressure fall to 3380 psi - 11.12 ppg EMW Bleed IA from 964 psi to 874 psi 12/23/2019 12/23/2019 1.20 FROM DRILL TRIP P RBIH 7,716.0 9,703.0 02:00 03:12 Set down twice at 8,592 and again at 8,668' pulled neg WOB to -1.6 k lbs, continue to RIH. Run out of push @ 8900' Stage beaded pill to bit, continue in hole. 12/23/2019 12/23/2019 2.90 PROM DRILL DRLG P CT 5665 psi @ 1.83 bpm, 1081 psi 9,703.0 9,903.0 03:12 06:06 free spin, BOBD CT -5 k lbs, WOB 0.9 k lbs, Swap to new mud system #3, new mud @ the bit 9,799' Old system retired with 0.9% DS and 2000' Pump 15 bbl beaded pills build from active mud 12/23/2019 12/23/2019 2.10 PROM DRILL DRLG P PUW = 37K, drilling, FS = 1131 psi, 9,898.0 10,019.0 06:06 08:12 @ 1.88 bpm, annular = 3817 psi, WHP = 277 psi, pump = 5788 psi Continue pumping beads, add —2% LoTorq to pill pit (test for increasing full active system), pump 15 bbl pill Page 25/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/23/2019 12/23/2019 0.80 PROM DRILL DRLG P Drilling, 15 bbl beaded & 2% LoTorq 10,019.0 10,103.0 08:12 09:00 pill exiting bit, PUW = 31 K, pill works to good effect, increased weight transfer & ROP PU with second lubed pill exiting bit, PUW = 28K, BOBD, again increase weight transfer 12/23/2019 12/23/2019 0.30 PROM DRILL WPRT P Wiper up-hole, PUW = 35k 10,103.0 9,103.0 09:00 09:18 12/23/2019 12/23/2019 0.50 PROM DRILL WPRT P Wiper in-hole, RIW = 5K 9,103.0 10,103.0 09:18 09:48 12/23/2019 12/23/2019 2.30 PROM DRILL DRLG P Drilling, FS = 1177 psi @ 1.88 bpm, 10,103.0 10,204.0 09:48 12:06 CWT = -1 K @ 0.8K WOB, annular = 3843 psi, WHP = 296 psi, pump = 6069 psi, lower ROP searching for pay, avg ROP = 44 fph 12/23/2019 12/23/2019 2.90 PROD1 DRILL DRLG P Drilling, CWT = snubbing, struggling 10,204.0 10,350.0 12:06 15:00 w/ weight transfer, annular = 3862 psi, WHP = 265 psi, pump = 6095 psi, avg ROP = 50 fph 12/23/2019 12/23/2019 1.50 PROD1 DRILL DRLG P Drilling, CWT = -6K @ 0.5K WOB, 10,350.0 10,427.0 15:00 16:30 annular = 3857 psi, WHP = 284 psi, pump = 5886 psi, avg ROP = 51 fph BHA wiper from 10,406', PUW = 29K, pump 15 bbl pill w/ 1 % drillZone 12/23/2019 12/23/2019 2.10 PROM DRILL DRLG P Drilling, drillZone hits bit, ROP and 10,427.0 10,510.0 16:30 18:36 weight trnsfer continue to degrade. 12/23/2019 12/23/2019 0.30 PROM DRILL WPRT P PU Wt 31 k lbs, PUH on wiper #2 10,510.0 9,513.0 18:36 18:54 12/23/2019 12/23/2019 1.80 PROM DRILL WPRT P RBIH, unable to RIH past 9,973'. PUH 9,513.0 10,510.0 18:54 20:42 slowly while staging second bead pill to the bit. RH snubbing to -10 k lbs 12/23/2019 12/24/2019 3.30 PROM DRILL DRLG P CT 5930 psi @ 1.86 bpm, free spin 10,510.0 10,564.0 20:42 00:00 1082 psi, CT Wt -10 k lbs, WOB 0.8 k lbs. ROP slow and continualy slowing down. Geos lost, targeting 86°. 12/24/2019 12/24/2019 3.00 PROD1 DRILL DRLG P OBD 10,564.0 10,618.0 00:00 03:00 CT 6037, CT WT -9.8 k Isb, WOB 0.88 k lbs, ROP. Out of zone. 12/24/2019 12/24/2019 1.50 PROM DRILL DRLG P OBD 10,618.0 10,651.0 03:00 04:30 CT 6111, CT WT -9.6 k Isb, WOB 1.0 k lbs, ROP 16 Out of zone. 12/24/2019 12/24/2019 2.50 PROM DRILL DRLG P Drilling, CWT = -9.8K @ 0.9K WOB, 10,651.0 10,715.0 04:30 07:00 annular = 3881 psi, WHP = 247 psi, pump = 6122 psi, avg ROP = 26 fph 12/24/2019 12/24/2019 3.00 PROM DRILL DRLG P Drilling, CWT = -5.8K @ 1 K WOB, 10,715.0 10,817.0 07:00 10:00 annular = 3873 psi, WHP = 298 psi, pump = 4807 psi, avg ROP = 34 fph 12/24/2019 12/24/2019 2.80 PROM DRILL DRLG P Drilling, continual pumping of beads, 10,817.0 10,900.0 10:00 12:48 CWT = -7K @ 1 K WOB, annular = 3887 psi, pump sweeps, avg ROP = 30 fph 12/24/2019 12/24/2019 1.40 PROD1 DRILL WPRT P Wiper to tubing tail, PUW = 31 K, clean 10,900.0 7,620.0 12:48 14:12 through window, clean through pilit- hole, jog 7" casing 12/24/2019 12/24/2019 0.10 PROM DRILL DLOG P Log K1 for+5' correction 7,620.0 7,632.0 14:12 14:18 Page 26/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/24/2019 12/24/2019 3.70 PROM DRILL WPRT P Wiper in-hole, clean past TOC, clean 7,632.0 10,900.0 14:18 18:00 through window, pump beaded pills to aid in getting to bottom, reduce rate & running speed Difficulty getting to bottom, 0.45 bpm, slow running speed, unable to turn around after PUS, pull 1 OK over at 9950', come up to 9200', attempt to get turned around, good, work to bottom slowly at min rate & 50 bbl beaded pill 12/24/2019 12/24/2019 3.50 PROM DRILL DRLG P Drilling, FS = 1050 psi @ 1.8 bpm, 10,900.0 10,974.0 18:00 21:30 CWT = -8K @ 0.4 WOB, annular = 4000 psi, WHP = 182 psi, pump = 6016 psi, avg ROP = 21 fph 12/24/2019 12/24/2019 1.90 PROD1 DRILL DRLG P OBD @ 1.8 bpm, CWT = -8K @ 0.85 10,974.0 11,011.0 21:30 23:24 WOB, annular = 3938 psi, WHIP = 250 psi, pump = 5050 psi ROP = 30 fph 12/24/2019 12/25/2019 0.60 PROD1 DRILL WPRT P PU Wt 39 k lbs, CPF3 called, Lost 11,011.0 10,776.0 23:24 00:00 power frame #5 & 6. PU, start generators and prepare to swap to rig power. 12/25/2019 12/25/2019 0.30 PROD1 DRILL WPRT P Continue to PUH. Rig generators 10,776.0 10,725.0 00:00 00:18 warmed up, confer with CPF# board operator to swap to rig power. CPF 3 power issues resolved 12/25/2019 12/25/2019 0.50 PROD1 DRILL TRIP P RBIH to drill, Snubbing, time out 50 10,725.0 11,011.0 00:18 00:48 bbl beads work slowly to bottom. 12/25/2019 12/25/2019 5.20 PROM DRILL DRLG P CT 4988 psi @ 1.55 bpm in/out - free 11,011.0 11,144.0 00:48 06:00 spin 816 psi, BHP 3919, 11.8 EMW @ the window, 12.66 ppg @ the bit. Ct Wt 9 k lbs, WOB 1 k lbs. 11,111 PU40klbs 11, 114 PU 42 k lbs 11,119 PU 41 k lbs 12/25/2019 12/25/2019 3.00 PROD1 DRILL DRLG P CT 4855 psi @ 1.5 bpm, BHP 3946 11,144.0 11,210.0 06:00 09:00 psi, Ct Wt -11 k Ibs, WOB 0.8 k lbs 12/25/2019 12/25/2019 3.00 PROD1 DRILL DRLG P CT 5238 psi @ 1.57 bpm, BHP 3966 11,210.0 11,245.0 09:00 12:00 psi, Ct Wt -9 k lbs, WOB 0.9 k lbs 12/25/2019 12/25/2019 3.00 PROD1 DRILL DRLG P CT 5300 psi @ 1.57 bpm, BHP 3968 11,245.0 11,279.0 12:00 15:00 psi, Ct Wt -9 k lbs, WOB 0.9 k lbs 12/25/2019 12/25/2019 1.20 PROM DRILL TRIP P CT 4853 psi @ 1.58 bpm, BHP 3970 11,279.0 11,300.0 15:00 16:12 psi, free spin 857 psi. Ct Wt 3.4 k lbs, WOB 0.84 k lbs "`New mud at the bit 11,279' 11295 PU Wt 42 k lbs 12/25/2019 12/25/2019 3.00 PROD1 DRILL TRIP P PU 36 k lbs, PUH on swab wiper. 11,300.0 78.3 16:12 19:12 12/25/2019 12/25/2019 1.50 PROM DRILL TRIP P RBIH 78.3 7,620.0 19:12 20:42 12/25/2019 12/25/2019 0.25 PROM DRILL DLOG P Log formation plus 1.5' 7,620.0 7,638.0 20:42 20:57 12/25/2019 12/25/2019 0.40 PROM DRILL TRIP P Perform SBHP @ 7,629.61' CTMD, 7,638.0 7,638.0 20:57 21:21 TVD 5,776.98', 11.089 ppg (AP -3,328 psi) 12/25/2019 12/25/2019 1.50 PROD1 DRILL TRIP P Continue IH, confirm TD 11,303' 7,638.0 11,303.0 21:21 22:51 12/25/2019 12/25/2019 0.75 PROM DRILL CIRC P Recip coil while circulating LRP 11,303.0 11,303.0 22:51 23:36 12/25/2019 12/26/2019 0.40 PROM DRILL TRIP P POOH, Laying in beaded 11.35 ppg, 11,303.0 10,804.0 23:36 00:00 paint TD flag 10,334 EOP (Yellow) Page 27/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) kx 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/26/2019 12/26/2019 1.10 PROD1 DRILL TRIP P Continue POOH laying in 11.36 ppg 10,804.0 7,763.0 00:00 01:06 beaded LRP 12/26/2019 12/26/2019 0.20 PROM DRILL TRIP P Pull through window clean, continue 7,763.0 7,620.0 01:06 01:18 POOH w/BLRP 12/26/2019 12/26/2019 0.20 PROM DRILL DLOG P Log formation for Window flag 7,620.0 7,638.0 01:18 01:30 12/26/2019 12/26/2019 1.10 PROD1 DRILL TRIP P Continue POOH 7,638.0 78.3 01:30 02:36 12/26/2019 12/26/2019 0.50 PROD1 DRILL OWFF P Check well for flow, PJSM 78.3 78.3 02:36 03:06 12/26/2019 12/26/2019 0.90 PROD1 DRILL PULD P LD, flush, and inspect BHA, inspect 78.3 0.0 03:06 04:00 coil above CTC (no flat spot observed) "' Note: No losses observed. 12/26/2019 12/26/2019 0.40 COMPZ1 CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0 04:00 04:24 12/26/2019 12/26/2019 1.60 COMPZ1 CASING PUTB P PU Lower lat completion - 25 joints 0.0 995.4 04:24 06:00 of 2-3/8" L-80 ST-L 6.4 ppf R3 slotted liner under a shorty deployment sleve capped with a non ported bull nose. LOA 995.35' Kick drill while running slotted, crew change 12/26/2019 12/26/2019 0.80 COMPZ1 CASING PULD P PU BHA# 27, swap upper checks, 995.4 1,039.6 06:00 06:48 stab injector. 12/26/2019 12/26/2019 1.20 COMPZ1 CASING RUNL P Bump up, set counters, RIH w IowerA 1,039.6 7,642.0 06:48 08:00 completion. 12/26/2019 12/26/2019 0.20 COMPZ1 CASING DLOG P Tie into window flag for -1.95', 7,642.0 7,627.0 08:00 08:12 PU Wt 29 k WOB -6.3 k lbs. 12/26/2019 12/26/2019 2.60 COMPZ1 CASING RUNL P RIH with IowerA lat completion 7,627.0 11,301.0 08:12 10:48 S/D @ 8687' work pipe S/D @ 9079' work pipe S/D @ 9812' work pipe S/D @ 9920' work pipe to bottom clean sailing after 10,245' Tag bottom 11301' WOB 1.5 k CT Wt 4 k lbs, PU Wt 35 k WOB -4.28. Stage pump to 1.5 bpm, diff 1141 psi, PU Wt 26 k lbs WOB -2.6 k lbs "'TOL 10,307.65' 12/26/2019 12/26/2019 0.80 COMPZ1 CASING TRIP P PUH, reset counters, pump 49 bbl 11,301.0 9,966.0 10:48 11:36 LRP to bit 12/26/2019 12/26/2019 2.00 COMPZ1 CASING DISP P PUH laying in fresh LRP - 49 bbls 9,966.0 62.0 11:36 13:36 Paint yellow TD flag @ 9347.4' and white window flag @ 6744.24'. 12/26/2019 12/26/2019 1.40 COMPZ1 CASING OWFF P Flow check, LD BHA 27 over a dead 62.0 0.0 13:36 15:00 well. 12/26/2019 12/26/2019 0.90 COMPZ1 CASING PUTB P PU middle A lat completion - 23 joints 0.0 917.4 15:00 15:54 of 2-3/8" L-80 ST-L 6.4 ppf R3 slotted liner under a shorty deployment sleve capped with a ported bull nose. LOA 916.19' 12/26/2019 12/26/2019 0.20 COMPZ1 CASING PULD P PU BHA #28, middle section A lat 917.4 963.0 15:54 16:06 completion. 12/26/2019 12/26/2019 0.20 COMPZ1 CASING RUNL P Bump up, set counters, RIH, w middle 963.0 7,661.7 16:06 16:18 A completion. 12/26/2019 12/26/2019 0.20 COMPZ1 CASING DLOG P Tie into window flag for minus 6.0' 7,661.7 7,661.7 16:18 16:30 PU Wt 30 k WOB -3.8 k lbs. Page 28/39 Report Printed: 1/27/2020 - Operations Summary (with Timelog Depths) 3H-01 ♦ •AM - 6 -Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/26/2019 12/26/2019 2.50 COMPZ1 CASING RUNL 77 Continue IH, intial set down 8,680', 7,661.7 10,307.0 16:30 19:00 work pipe, PUW 46/-18k DHWOB, continue IH to next set down 9,730', PUW 31 k with minimal DHWOB observed. continue IH to bottom, PUW 33 k, DWHOB -3.6 k, set back down on bottom. 12/26/2019 12/26/2019 0.15 COMPZ1 CASING TRIP P Bring pump online 1.5 bpm / 1,123 psi 10,307.0 9,391.0 19:00 19:09 diff, PUH 24 k, minus 1.8 k DHWOB. remove liner length from counters. Line up pumping across the top. 12/26/2019 12/26/2019 0.65 COMPZ1 CASING TRIP P POOH, painting TD/EOP flag @ 9,391.0 7,751.0 19:09 19:48 8,350' (Yellow) 12/26/2019 12/26/2019 0.20 COMPZ1 CASING DLOG P Log the RA marker correction of plus 7,751.0 7,768.0 19:48 20:00 7.0' 12/26/2019 12/26/2019 1.50 COMPZ1 CASING TRIP P Continue POOH, paint window EOP 7,768.0 44.2 20:00 21:30 flag @ 6,600' (White), 12/26/2019 12/26/2019 0.50 COMPZ1 CASING OWFF P At surface, check well for flow, PJSM 44.2 44.2 21:30 22:00 12/26/2019 12/26/2019 0.75 COMPZ1 CASING PULD P LD, flush, and inspect BHA 44.2 0.0 22:00 22:45 12/26/2019 12/26/2019 0.40 COMPZ1 CASING PUTB P Prep RF for Liner OPS, PJSM, 0.0 0.0 22:45 23:09 12/26/2019 12/27/2019 0.85 COMPZ1 CASING PUTB P PU upper liner completion joint 1-15 0.0 592.3 23:09 00:00 12/27/2019 12/27/2019 0.85 COMPZI CASING PUTB P Continue PU slotted liner segment #3 592.3 993.0 00:00 00:51 (15-27 jts) 12/27/2019 12/27/2019 0.60 COMPZ1 CASING RUNL P PJSM, PU BOT LTB and BHI CoilTrak 993.0 1,037.2 00:51 01:27 tools, inspect pac-off (change -out), surface test CTK tools (good -test) 12/27/2019 12/27/2019 1.40 COMPZ1 CASING RUNL P Tag up, reset counter depths to zero, 1,037.2 7,636.5 01:27 02:51 RIH 12/27/2019 12/27/2019 0.15 COMPZI CASING RUNL P Correct to the EOP flag 7636.5' plus 7,636.5 7,636.5 02:51 03:00 1.0', PUW 29 k, DHWOB -6.1 k 12/27/2019 12/27/2019 0.85 COMPZ1 CASING RUNL P Continue IH, initial S/D @ 8,966' 7,636.5 9,390.2 03:00 03:51 worked pipe down hole to 9,034', continue IH fairly clean to bottom, PUW 32 k, DHWOB - 4.9 k, set back down on bottom. 12/27/2019 12/27/2019 0.20 COMPZ1 CASING RUNL P Bring pump online 1.34 bpm at 3,822 9,390.2 8,397.2 03:51 04:03 psi, Diff=1,046 psi, PUW 24 k, DHWOB=- 2.3 k, remove liner length from counter, line up across the top *** TOL @ 8,397.2- 12/27/2019 12/27/2019 1.60 COMPZ1 CASING TRIP P POOH 8,397.2 63.4 04:03 05:39 12/27/2019 12/27/2019 0.80 COMPZ1 CASING TRIP P LD BHA # 29 over a dead well. 63.4 0.0 05:39 06:27 12/27/2019 12/27/2019 0.50 PROD2 CASING TRIP P Pull checks, stab injector, jet stack 0.0 0.0 06:27 06:57 12/27/2019 12/27/2019 0.70 PROD2 CASING CTOP P Grease and flush 0.0 0.0 06:57 07:39 12/27/2019 12/27/2019 0.50 PROD2 WHDBOP BOPE P Reverse circ, 0.0 0.0 07:39 08:09 Test 13. Stab injector and line up to reverse circulate coil, test inner reel valve and stripper. 12/27/2019 12/27/2019 1.10 PROD2 WHDBOP BOPE T Fluid pack and test swab #2 to 4k psi- 0.0 0.0 08:09 09:15 fail, grease- fail, grease - pass, shell test to 4000 psi -good release valve crew Page 29139 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time �1227/2019 Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/27/2019 4.50 PROD2 WHDBOP BOPE P Test witness waived by Adam Earl - 0.0 0.0 09:15 13:45 AOGCC Test pressure 250/4000 psi low //high. Test 1. Swab 2 Test 2. Blind/Shear, BOP TV2, Charlie 4, 5, 8, &12 Test 3. BOP TV 1, Charlie 3, 7, & 11 Test 4. Manual choke D & Super choke C Test 5. Romeo 3, Bleeder 3, Tango 2, Charlie 2, & 10 Test 6. Charlie 1, 9, Bravo 5, and Tango 1 — install TIW test joint Test 7. Lower 2" pipe slip rams, TIW #1, Romeo 1, Bleeder 1 Test 8. Annular BOP Test 9. Upper 2" pipe slip rams, Bravo 6,&8 Test 10. Bravo 7 — swap out 2" test joint for 2-3/8" Test 11. 2-3/8" pipe slip rams, TIW#2 — check N2 levels, swap to 2" test joint Test 12. Draw down accumulator, stabilized starting pressure 2400 psi, time to 200 psi increase 19 sec, full recovery time until pumps shut down 48, N2 bottles — average of 4, 2000 psi Tested all gas detectors, pits, cellar, rig floor all functioned properly, Verified flow alarms - PVT 12/27/2019 12/27/2019 0.50 PROD2 STK CTOP P Stab injector, drop off QTS, PT to 0.0 0.0 13:45 14:15 1500 psi - good, blow down, unstab injector, skid cart, install checks 12/27/2019 12/27/2019 0.90 PROD2 STK PULD P Crew change - PJSM, valve checklist 0.0 78.3 14:15 15:09 PU BHA#30, AL1 lateral drilling assembly. 0.5° AKO motor w dynamus and new agitator. Bump up, set counters. 12/27/2019 12/27/2019 1.40 PROD2 STK TRIP P RIH W BHA #30 78.3 7,620.0 15:09 16:33 12/27/2019 12/27/2019 0.20 PROD2 STK DLOG P Tie into the K1 for -0.5' correction 7,609.0 7,639.0 16:33 16:45 12/27/2019 12/27/2019 0.60 PROD2 STK DISP P PU Wt 27 K lbs 7,620.0 7,630.0 16:45 17:21 Pump mud to the bit 12/27/2019 12/27/2019 0.60 PROD2 STK DISP P Displace well bore to drilling fluid 7,630.0 7,630.0 17:21 17:57 12/27/2019 12/27/2019 0.30 PROD2 STK TRIP P Function closed EDC, continue IH 7,630.0 8,392.0 17:57 18:15 12/27/2019 12/27/2019 0.20 PROD2 STK TRIP P Dry tag TOB @ 8,392', PUH obtain 8,392.0 8,392.0 18:15 18:27 parameters. 12/27/2019 12/27/2019 1.80 PROD2 STK KOST P Kickoff Billet, 1.87 bpm at 5,658 psi, 8,392.0 8,394.7 18:27 20:15 Dlff=1,253 psi, WHP=124, BHP=3,712, IA=833, OA=565, time mill 1, 2, 3 foot as per RP with no stalls 12/27/2019 12/27/2019 1.10 PROD2 DRILL DRLG P Drill ahead, 1.87 bpm at 5,648 psi, 8,394.7 8,493.8 20:15 21:21 Diff=3,675 psi, WHP=232, BHP=3,675, IA=844, OA=590 Page 30/39 Report Printed: 1/27/2020 = Operations Summary (with Timelog Depths) 3H-01 ry • ♦ i 0 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (WB) End Depth (ftKB) 12/27/2019 12/27/2019 0.15 PROD2 DRILL WPRT P PUH, PUW 29 k, dry drift kickoff point 8,493.8 8,375.0 21:21 21:30 (Clean) *** Note: Kuparuk is in cold weather conditions, - 38°, vairance obtained for super sucker work, and loader opertions 12/27/2019 12/27/2019 0.15 PROD2 DRILL WPRT P Wiper back in hole, RIW 10 k 8,375.0 8,493.8 21:30 21:39 12/27/2019 12/27/2019 1.60 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 4,044 psi, 8,493.8 8,716.0 21:39 23:15 DIff=1,235 psi, WHP=178, BHP=3,719, IA=852, OA=830 12/27/2019 12/27/2019 0.25 PROD2 DRILL WPRT P Pull Geo wiper up hole, PUW 28 k 8,716.0 8,416.0 23:15 23:30 12/27/2019 12/27/2019 0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW 8,416.0 8,716.0 23:30 23:48 12/27/2019 12/28/2019 0.20 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 5,053 psi, 8,716.0 8,737.0 23:48 00:00 DIff=1,227 psi, WHP=204, BHP=3,719, IA=859, OA=667 12/28/2019 12/28/2019 2.00 PROD2 DRILL DRLG P OBD, 1.85 bpm at 5,948 psi, OB 8,737.0 9,019.0 00:00 02:00 Diff=1,512, WHP=195, BHP=3,719, IA=859, OA=669 12/28/2019 12/28/2019 0.75 PROD2 DRILL DRLG P OBD, 1.85 bpm at 5,948 psi, OB 9,019.0 9,125.0 02:00 02:45 Diff=1,615, WHP=195, BHP=3,739, IA=858, OA=665 12/28/2019 12/28/2019 0.30 PROD2 DRILL WPRT P Wiper up hole, PUW 31 k 9,125.0 8,425.0 02:45 03:03 12/28/2019 12/28/2019 0.25 PROD2 DRILL WPRT P Wiper back in hole, RIW 9.4 k 8,425.0 9,125.0 03:03 03:18 12/28/2019 12/28/2019 1.50 PROD2 DRILL DRLG P OBD, 1.85 bpm at 5,948 psi, OB 9,125.0 9,328.0 03:18 04:48 Diff=1,512, WHP=195, BHP=3,719, IA=859, OA=669 12/28/2019 12/28/2019 0.50 PROD2 DRILL WPRT P PUW 30 k - Geo wiper - geo's lost 9,328.0 9,143.0 04:48 05:18 12/28/2019 12/28/2019 0.10 PROD2 DRILL WPRT P RBIH 9,143.0 9,328.0 05:18 05:24 12/28/2019 12/28/2019 3.00 PROD2 DRILL DRLG P CT 5844 psi @ 1.83 bpm in/out, BHP 9,328.0 9,640.0 05:24 08:24 3725 psi, Free spin 1373 psi, OBD CT 5 k lbs, WOB 1 k lbs 12/28/2019 12/28/2019 0.50 PROD2 DRILL WPRT P PUW 33 k lbs - 3rd wiper to the 9,640.0 7,785.0 08:24 08:54 window for tie in 839'500 Ib WOB tug @ the billet 8197' small amount of motor work and -WOB to 0.6 k lbs 7955 - 7874 -500 lbs WOB 12/28/2019 12/28/2019 0.10 PROD2 DRILL DLOG P Tie into the RA tag for +3' corretion 7,785.0 7,811.0 08:54 09:00 12/28/2019 12/28/2019 0.80 PROD2 DRILL WPRT P RBIH 7,811.0 9,640.0 09:00 09:48 12/28/2019 12/28/2019 4.10 PROD2 DRILL DRLG P CT 5812 psi @ 1.82 bpm in/out, BHP 9,640.0 9,966.0 09:48 13:54 3829 psi, diff 1312 psi. OBD -3 k lbs, WOB 1.26 k lbs, WH 166 psi, IA 875 psi, OA 717 psi. 12/28/2019 12/28/2019 1.10 PROD2 DRILL DRLG P PU 33 k lbs - reduce rate in an atempt 9,966.0 10,050.0 13:54 15:00 to target more WOB in order to get some turn. CT 4839 psi @ 1.54 bpm, diff 1007 psi, BHP 3815 psi, 11.8 ppg @ the window, 12.36 ppg @ the bit. CT Wt - 5 k lbs, WOB 1.12 k lbs 12/28/2019 12/28/2019 0.20 PROD2 DRILL WPRT P PU on Wiper #1 - PU Wt 30 k lbs i 10,050.0 i 9,050.0 15:00 15:12 1 1 1 1 1 Page 31/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/28/2019 12/28/2019 1.00 PROD2 DRILL WPRT P RBIH 9,050.0 10,050.0 15:12 16:12 12/28/2019 12/28/2019 1.80 PROD2 DRILL DRLG P CT 6025 psi @ 1.82 bpm in/out, Diff 10,050.0 10,160.0 16:12 18:00 1321 psi, BHP 3885. WH 90 psi, IA 879 psi, OA 742 psi. CT Wt -5 k lbs, WOB 1.2 k lbs 12/28/2019 12/28/2019 2.00 PROD2 DRILL DRLG P OBD, 1.83 bpm at 5,748 psi, OB 10,160.0 10,260.0 18:00 20:00 Diff=1,524 psi, WHP=90, BHP=3,885, IA=869, OA=713 12/28/2019 12/28/2019 2.20 PROD2 DRILL DRLG P OBD, 1.83 bpm at 5,748 psi, OB 10,260.0 10,450.0 20:00 22:12 Diff=1,484 psi, WHP=276, BHP=3,860, IA=869, OA=713 12/28/2019 12/28/2019 0.40 PROD2 DRILL WPRT P Wiper up hole, PUW 34 k 10,450.0 9,450.0 22:12 22:36 12/28/2019 12/28/2019 0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW 7.5 k 9,450.0 10,450.0 22:36 22:54 12/28/2019 12/29/2019 1.10 PROD2 DRILL DRLG P BOBD, 1.85 bpm at 5,297 psi, Off 10,450.0 10,522.0 22:54 00:00 bottom DIff= 1,462, WHP=269, BHP=3,857, IA=869, OA=687 12/29/2019 12/29/2019 1.20 PROD2 DRILL DRLG P OBD, 1.86 bpm at 5,895 psi, On 10,522.0 10,579.0 00:00 01:12 bottom diff=1,360 psi, WHP=262, BHP=3,872, IA=870, OA=691 12/29/2019 12/29/2019 2.00 PROD2 DRILL DRLG P OBD, 1.85 bpm at 5,889 psi, 10,579.0 10,619.0 01:12 03:12 OBD=1,306 psi, WHP=223, BHP=3,899, IA=875, OA=717, crossing into high gamma +/- 150 api, continue drilling ahead 12/29/2019 12/29/2019 1.20 PROD2 DRILL DRLG P OBD, 1.84 bpm at 5,886 psi, On 10,619.0 10,638.0 03:12 04:24 bottom diff=1,378 psi, WHP=262, BHP=3,919, IA=875, OA=718 12/29/2019 12/29/2019 1.60 PROD2 DRILL DRLG P OBD, 1.84 bpm at 5,886 psi, On 10,638.0 10,661.0 04:24 06:00 bottom diff=1,378 psi, WHP=262, BHP=3,919, IA=875, OA=718 12/29/2019 12/29/2019 3.30 PROD2 DRILL DRLG P OBD, PU @ 10,662' PU Wt 32 k lbs 10,661.0 10,699.0 06:00 09:18 CT 5932 pi @ 1.83 bpm in/out, free spin 1226 psi, BHP 3945 psi - targeting 11.8 ppg @ the window - 12.7 ppg @ the bit. CT -7 k lbs, WOB 0.3 k lbs 12/29/2019 12/29/2019 1.00 PROD2 DRILL WPRT P PU Wt 33 k lbs. Pull up hole above 10,699.0 7,782.0 09:18 10:18 hot gamma. slight WOB tugs until clear of hot gamma @ 10,554'. Attempt to turn around @ 10,348', no success. Pull long wiper to window for tie in Cutting ration is breaking trend and increasing rapidly, 0.3 bbls cutting returned on the trip. 12/29/2019 12/29/2019 0.20 PROD2 DRILL DLOG P Tie into the RA tag for a +4.5' 7,782.0 7,807.0 10:18 10:30 correction. 12/29/2019 12/29/2019 1.10 PROD2 DRILL WPRT P RBIH 7,807.0 10,699.0 10:30 11:36 S/D at historic spot 9,329', work through slowly S/D 10,580' PU continue in hole. WOB spikes to 1 k from 10,567'- 10,614'. 12/29/2019 12/29/2019 3.00 PROD2 DRILL WPRT P CT 6005 psi @ 1.85 bpm in / out. 10,699.0 10,777.7 11:36 14:36 BHP 3876 psi diff 1190 psi, WH 231 psi, IA 876 psi, OA 736 psi, CT -8 k lbs, WOB 1.2 k lbs. 12/29/2019 12/29/2019 2.40 PROD2 DRILL WPRT P OBD - CT 6170 psi @ 1.85 bpm in / 10,777.7 10,830.0 14:36 17:00 out. BHP 3906 psi, WH 196 psi, IA 879 psi, OA 760 psi, CT -8 k lbs, WOB 0.92 k lbs. Page 32/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 1 rX L46:i� Y 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/29/2019 12/29/2019 2.00 PROD2 DRILL DRLG P OBD, 1.86 bpm at 5,762 psi, DIff=914, 10,830.0 10,867.0 17:00 19:00 WHP=202. BHP=3,918, IA=887, OA=790 12/29/2019 12/29/2019 2.00 PROD2 DRILL DRLG P OBD, 1.86 bpm at 5,762 psi, DIff=914, 10,867.0 10,900.0 19:00 21:00 WHP=202. BHP=3,918, IA=887, OA=790 12/29/2019 12/29/2019 1.00 PROD2 DRILL DRLG P OBD, 1.86 bpm at 5,762 psi, DIff=914, 10,900.0 10,909.0 21:00 22:00 WHP=202. BHP=3,918, IA=887, OA=790 12/29/2019 12/29/2019 0.80 PROD2 DRILL WPRT P Wiper up hole, PUW 35 k, pull heavy 10,909.0 8,450.0 22:00 22:48 @ 10,572' CTSW 47 k, DHWIOB 7.5 k 12/29/2019 12/30/2019 1.20 PROD2 DRILL WPRT P Wiper back in hole with low surface 8,450.0 10,618.0 22:48 00:00 weight -3 to -5 k, pumping beads 12/30/2019 12/30/2019 0.15 PROD2 DRILL WPRT P Continue wiper back in hole working 10,618.0 10,667.0 00:00 00:09 pipe through tight spot @ 10,544'- 10,667', stackout beads, build pill with addtional beads 12/30/2019 12/30/2019 0.85 PROD2 DRILL WPRT P PUH above tight area, Pull 52 k 10,667.0 10,220.0 00:09 01:00 CTSW, 10,598' 12/30/2019 12/30/2019 0.50 PROD2 DRILL WPRT P Unable to RBIH, circluate addtional pill 10,220.0 9,860.0 01:00 01:30 with beads and raise lube in system #6 wtih 1 % Io-torq 12/30/2019 12/30/2019 1.30 PROD2 DRILL WPRT P RBIH, work pipe back to bottom 9,860.0 10,909.0 01:30 02:48 slowly 12/30/2019 12/30/2019 3.20 PROD2 DRILL DRLG P BOBD, 1.5 bpm at 4,884 psi, Off 10,909.0 10,935.0 02:48 06:00 Bottom 1070 psi, WHP=288, BHP=3,949, IA=874, OA=733 `*'Average ROP 8 ft/hr 12/30/2019 12/30/2019 2.60 PROD2 DRILL DRLG P BOBD, 1.5 bpm at 5116 psi, 10,935.0 10,961.0 06:00 08:36 WHP=182, BHP=3921, IA=879, OA=750 12/30/2019 12/30/2019 2.90 PROD2 DRILL WPRT P PU Wt 38 k lbs 10,961.0 78.3 08:36 11:30 Unable to RBIH, town called TD, Pull swab wiper to surface. Pull heavy, 10,633 - 10,561'-5 k WOB to 50 k CT Wt, could not RBIH, clean after 10,560', billet and window clean. Jog at 680', continue out of hole, 0.5 MIS of solids returned on the trip. 12/30/2019 12/30/2019 1.40 PROD2 DRILL TRIP P RBIH 78.3 7,599.0 11:30 12:54 start 1 ppb beaded pill down the coil 12/30/2019 12/30/2019 0.10 PROD2 DRILL DLOG P Tie into the K1 for no correction. 7,599.0 7,640.0 12:54 13:00 12/30/2019 12/30/2019 0.30 PROD2 DRILL TRIP P Perform SBHP @ 7,707' CTMD, TVD 7,640.0 7,707.0 13:00 13:18 5,868' Trap 3526 psi pressure bled slowly to 3511 psi over 5 min Bleed well to 3390 psi pressure held constant after climbing the 3399 psi over 5 min Bleed well to 3352 psi, pressure increased to 3362 then stabilized over 7 minutes " BHP 11.1 ppg EMW - Page 33139 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (WB) 12/30/2019 12/30/2019 1.60 PROD2 DRILL TRIP P Continue IH to 10,550'- Beads exiting 7,707.0 10,221.0 13:18 14:54 hte bit @ 9,300' 8212'2 k WOB spike 8395'0.4 k WOB spike at billet 9338', 1.7 k WOB spike - historic S/D 10221 - slight pack off event - PU to 10095, RBIH 12/30/2019 12/30/2019 0.90 PROD2 DRILL TRIP P PUH to clean up for OH anchored 10,221.0 7,853.0 14:54 15:48 billet on wiper to window. 12/30/2019 12/30/2019 0.75 PROD2 DRILL TRIP P RBIH pumping beaded active pill to 7,853.0 9,640.0 15:48 16:33 the bit. WOB spikes at 9324'- historic and 9451' 12/30/2019 12/30/2019 2.00 PROD2 DRILL DISP P POOH laying in active beaded mud 9,640.0 78.3 16:33 18:33 pill. 12/30/2019 12/30/2019 1.70 PROD2 DRILL PULD P At surface, PUD drilling assembly wtih 78.3 0.0 18:33 20:15 open EDC, checks not holding, function BHI CoilTrak tools close EDC, continue PUD 12/30/2019 12/30/2019 1.50 PROD2 STK PULD P PD, Open Hole Anchored billet and 0.0 72.7 20:15 21:45 CoilTrak tools 12/30/2019 12/30/2019 1.50 PROD2 STK TRIP P RIH, with OH Anchored Billet 72.7 7,622.0 21:45 23:15 assembly BHA#31 12/30/2019 12/30/2019 0.20 PROD2 STK DLOG P Log formation for depth minus 1.0', 7,622.0 7,648.0 23:15 23:27 PUW 27 k 12/30/2019 12/31/2019 0.55 PROD2 STK TRIP P RIH to bottom with weight bobbles @ 7,648.0 9,037.0 23:27 00:00 7,823' (6k DHWOB), 7,836' (8k DHWOB), 8,400' (8.5k DHWOB) 12/31/2019 12/31/2019 0.30 PROD2 STK TRIP P Continue IH with OH Anchored billet 9,037.0 9,651.8 00:00 00:18 12/31/2019 12/31/2019 0.20 PROD2 STK TRIP P On depth, PUW=31 k, Run back in 9,651.8 9,640.0 00:18 00:30 hole to setting depth, bring pump up to shear @ 4,400 psi, set down DHWOB=3.58k 12/31/2019 12/31/2019 1.70 PROD2 STK TRIP P POOH 9,640.0 72.7 00:30 02:12 12/31/2019 12/31/2019 1.40 PROD2 STK PULD P PUD setting tools BHA# 31 72.7 0.0 02:12 03:36 12/31/2019 12/31/2019 0.80 PROD2 STK PULD P Install 2.5" nozzle, stab INJH, reverse 0.0 0.0 03:36 04:24 circ, unstab INJH, change out BHI Upper Quick (houred out) 12/31/2019 12/31/2019 1.30 PROD2 STK PULD P PD Kickoff/Drilling Assembly BHA#32, 0.0 78.2 04:24 05:42 bump up space out 12/31/2019 12/31/2019 0.30 PROD2 STK PULD T RIH w BHA#32 78.2 222.0 05:42 06:00 Lost comms to tool @ 85.5' MWD troubleshooting, park at 222' 12/31/2019 12/31/2019 0.40 PROD2 STK PULD T PUH, bump up, space out. 222.0 78.2 06:00 06:24 12/31/2019 12/31/2019 0.80 PROD2 STK PULD T Partial PUD, un stab injector, BHA#23 78.2 78.2 06:24 07:12 left hanging in the hole. Remove upper Quick sieve, approxi' foot of wire hanging with shorted/ burnt section 1/4" above the boot. test E - line, test tool. Repair connection, Stab injector, bump up, 12/31/2019 12/31/2019 0.30 PROD2 STK TRIP T RIH w BHA# 32. 78.2 497.0 07:12 07:30 Lose comms with tool at 497' Park, Troubleshoot tools 12/31/2019 12/31/2019 0.30 PROD2 STK TRIP T PUH, bump up, space out 497.0 78.2 07:30 07:48 Page 34/39 Report Printed: 1/27/2020 - - Operations Summary (with Timelog Depths) 3H-01 .00 , Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 12/31/2019 12/31/2019 1.00 PROD2 STK PULD T Partial PUD, un stab injector, BHA#23 78.2 78.2 07:48 08:48 left hanging in the hole. Remove upper Quick Steve, approx1' foot of wire hanging with shorted/ burnt section pulled out of the boot. 12/31/2019 12/31/2019 1.10 PROD2 STK PULD T PUD and stand back BHA, LD agitator 78.2 0.0 08:48 09:54 and motor. Cut 18' of coil - remove flat spots. Decide to pump slack. 12/31/2019 12/31/2019 2.30 PROD2 STK CIRC T Cut off CTC, boot wire, stab on, pump 0.0 0.0 09:54 12:12 slack back to 2.9 bpm, surge rate 5 times, pop off no wire movement. Stab back on, pump to 2.9 bpm, surge rate 3 times, hear wire move. pop off. 12/31/2019 12/31/2019 3.30 PROD2 STK CTOP T Cut coil, found wire at 47', rig down 0.0 0.0 12:12 15:30 hydrulic cutter and hand cut, Ream and install new CTC pull test to 35 k lbs - good, rehead, test wire - good torque up, PT to 4500 psi - good. 12/31/2019 12/31/2019 1.10 PROD2 STK PULD T PD BHA#33. 0.0 78.2 15:30 16:36 12/31/2019 12/31/2019 0.40 PROD2 STK CIRC T Pump slack forward 1 coil vol @ -1.9 78.2 78.2 16:36 17:00 bpm 12/31/2019 12/31/2019 0.20 PROD2 STK TRIP T RIH pumping 1 bpm 78.2 497.0 17:00 17:12 12/31/2019 12/31/2019 1.40 PROD2 STK TRIP P Close EDC, Shallow test agitator- 497.0 7,616.0 17:12 18:36 good, open EDC, continue to RIH pumping 1 bpm. 12/31/2019 12/31/2019 0.20 PROD2 STK DLOG P Tie into the K1 for -0.5' correction 7,616.0 7,635.9 18:36 18:48 12/31/2019 12/31/2019 1.00 PROD2 STK TRIP P Close EDC, continue in hole. Window 7,635.9 9,641.6 18:48 19:48 and billet clean. SD @ 9293' roll LS, continue in hole. Tag TOB 9641.6' PU and set rate RBIH 12/31/2019 12/31/2019 1.00 PROD2 STK KOST P CT 5870 psi @ 1.85 in/out, free spin 9,640.8 9,641.8 19:48 20:48 diff 1277 psi, BHP 3818 psi targeting 11.8 @ the window, WH 125 psi, IA 851 psi OA 613 psi. CT 12.7 k lbs, 0.6 k lbs Ease into billet, feed a few tenths then engage auto driller at 1 ft/hr 12/31/2019 12/31/2019 0.50 PROD2 STK KOST P Increase ROP to 2 f/hr CT 10.5 k lbs 9,641.8 9,642.8 20:48 21:18 WOB 0.00, WOB spiked to 1 k lbs @ 9,642'no stall, drilled off. 12/31/2019 12/31/2019 0.25 PROD2 STK KOST P Increase ROP to 3 f/hr CT Wt 8.8 lbs, 9,642.8 9,645.0 21:18 21:33 WOB 0.4 Poor weight transfer, billet milling atypical. 12/31/2019 12/31/2019 1.30 PROD2 DRILL DRLG P Drill Ahead, 1.8 bpm at 5,909 psi, On 9,645.0 9,722.0 21:33 22:51 bottom diff=3,801 psi, WHP=193, BHP=3,799, IA=860, OA=663 1/1/2020 1/1/2020 0.35 PROD2 DRILL DRLG P Drill Ahead, 1.8 bpm at 5,909 psi, On 9,722.0 9,746.0 00:00 00:21 bottom diff=3,801 psi, WHP=193, BHP=3,799, IA=860, OA=663 1/1/2020 1/1/2020 0.15 PROD2 DRILL WPRT P Pull up hole to drift kickoff point, PUW 9,746.0 9,630.0 00:21 00:30 29 k 1/1/2020 1/1/2020 0.15 PROD2 DRILL WPRT P Wiper back in hole, RIW 5.5 k 9,630.0 9,746.0 00:30 00:39 1/1/2020 1/1/2020 4.50 PROD2 DRILL DRLG P BOBD, 1.8 bpm at 5,682 psi, Off 9,746.0 10,145.0 00:39 05:09 Bottom Diff=1,187 psi, WHP=177, BHP=3,804, IA=861, OA=667 Page 35/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 1/1/2020 1/1/2020 0.30 PROD2 DRILL WPRT P Wiper up hole PUW 28k 10,145.0 9,666.5 05:09 05:27 1/1/2020 1/1/2020 0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW -3.Ok 9,666.5 10,145.0 05:27 05:45 1/1/2020 1/1/2020 6.25 PROD2 DRILL DRLG P BOBD, 1.80 bpm at 4,776 psi, Off 10,145.0 10,550.0 05:45 12:00 Bottom Diff=903 psi, WHP=209, BHP=3,862, IA=867, OA=717 1/1/2020 1/1/2020 0.30 PROD2 DRILL WPRT P Pull wiper up hole to 9,700', PUW 31 k 10,550.0 9,700.0 12:00 12:18 1/1/2020 1/1/2020 0.30 PROD2 DRILL WPRT P Wiper back in hole RIW 2.0 k 9,700.0 10,550.0 12:18 12:36 1/1/2020 1/1/2020 6.65 PROD2 DRILL DRLG P BOBD, 1.8 bpm at 5,722 psi, Off 10,550.0 10,951.0 12:36 19:15 bottom Diff=1,205 psi, WHP=150, BHP=3,836, IA=872, OA=744 "' Note: :New mud at the bit 10,654' 1/1/2020 1/1/2020 1.40 PROD2 DRILL WPRT P Wiper up hole PUW- 35k 10,951.0 7,617.2 19:15 20:39 1/1/2020 1/1/2020 0.10 PROD2 DRILL DLOG P Tie into the K1 for -2.5' correction 7,617.2 20:39 20:45 1/1/2020 1/1/2020 1.34 PROD2 DRILL WPRT P Wiper back in hole, RIW- -4.3k 7,617.2 10,951.0 20:45 22:05 1/1/2020 1/2/2020 1.91 PROD2 DRILL DRLG P BOBD, 1.5 bpm at 4758 psi, 10,951.0 11,003.0 22:05 00:00 WHP=371, BHP=3,894, IA=857, OA=666 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.57 bpm at 4,490 psi, Off 11,003.0 11,047.0 00:00 02:00 Bottom Diff=1,084 psi, WHP=283, BHP=3,943, IA=866, OA=715 1/2/2020 1/2/2020 2.40 PROD2 DRILL DRLG P BOBD, 1.57 bpm at 4,490 psi, Off 11,047.0 11,118.0 02:00 04:24 Bottom Diff=1,084 psi, WHP=283, BHP=3,943, IA=866, OA=715 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 5,300 psi, Off 11,118.0 11,169.0 04:24 06:24 Bottom Diff=1,110 psi, WHP=275, BHP=3,932, IA=866, OA=715 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 5,300 psi, Off 11,169.0 11,215.0 06:24 08:24 Bottom Diff=1,110 psi, WH P=275, BHP=3,932, IA=866, OA=715 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 5,300 psi, Off 11,215.0 11,271.0 08:24 10:24 Bottom Diff=1,110 psi, WHP=275, BHP=3,932, IA=866, OA=715 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 5,300 psi, Off 11,271.0 11,316.0 10:24 12:24 Bottom Diff=1,110 psi, WHP=275, BHP=3,932, IA=866, OA=715 1/2/2020 1/2/2020 1.20 PROD2 DRILL DRLG P BOBD, 1.86 bpm at 5,592 psi, Off 11,316.0 11,350.0 12:24 13:36 Bottom Diff=1,110 psi, WHP=260, BHP=3,932, IA=868, OA=721 1/2/2020 1/2/2020 0.30 PROD2 DRILL WPRT P Wiper up hole PUW 34 k 11,350.0 10,500.0 13:36 13:54 1/2/2020 1/2/2020 0.60 PROD2 DRILL WPRT P Wiper back in hole, RIW 0 k 10,500.0 11,350.0 13:54 14:30 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.81 bpm at 5,519 psi, Off 11,350.0 11,428.0 14:30 16:30 Bottom Diff=1,110 psi, WHP=231, BHP=3,941, IA=870, OA=740 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.85 bpm at 5,544 psi, Off 11,428.0 11,517.0 16:30 18:30 Bottom Diff=1,110 psi, WHP=255, BHP=3,966, IA=871, OA=742 1/2/2020 1/2/2020 2.00 PROD2 DRILL DRLG P BOBD, 1.84 bpm at 5,552 psi, Off 11,517.0 11,588.0 18:30 20:30 Bottom Diff=1,110 psi, WHP=255, BHP=3,960, IA=871, OA=742 1/2/2020 1/2/2020 2.50 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 5,934 psi, Off 11,517.0 11,640.0 20:30 23:00 Bottom Diff=1,110 psi, WHP=263, BHP=4,009, IA=870, OA=740 Page 36/39 Report Printed: 1/27/2020 a Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operafion (ftKB) End Depth (ftKB) 1/2/2020 1/3/2020 1.00 PROD2 DRILL TRIP P POOH for swab wiper. PU- 38k 11,640.0 9,181.0 23:00 00:00 1/3/2020 1/3/2020 2.00 PROD2 DRILL TRIP P Cont POOH for swab wiper. PU- 38k 9,181.0 71.0 00:00 02:00 1/3/2020 1/3/2020 1.50 PROD2 DRILL TRIP P RIH to K1 maker to tie in 71.0 7,621.0 02:00 03:30 1/3/2020 1/3/2020 0.10 PROD2 DRILL DLOG P Tie into the K1 for -0.0' correction 7,621.0 7,629.0 03:30 03:36 1/3/2020 1/3/2020 0.20 PROD2 DRILL OWFF P Perform SBHP test ECD=11.16 ppg, 7,629.0 7,629.0 03:36 03:48 3,350 psi @ 7,580' RKB / 5,776.72' TVD 1/3/2020 1/3/2020 1.70 PROD2 DRILL TRIP P Cont RIH to confirm TD 7,629.0 11,643.0 03:48 05:30 1/3/2020 1/3/2020 0.50 PROD2 DRILL TRIP P Confirm TD, recip pipe while 11,643.0 11,643.0 05:30 06:00 circulating Beaded LRP 1/3/2020 1/3/2020 1.50 PROD2 DRILL TRIP P POOH, while laying in beaded 11.35 11,643.0 7,050.0 06:00 07:30 ppg completion fluid up to 7,050' 1/3/2020 1/3/2020 1.10 PROD2 DRILL TRIP P Continue POOH 7,050.0 78.2 07:30 08:36 1/3/2020 1/3/2020 0.50 PROD2 DRILL OWFF P At surface, check well for flow, PJSM 78.2 78.2 08:36 09:06 1/3/2020 1/3/2020 0.30 PROD2 DRILL PULD P LD, drilling assembly BHA #33 78.2 0.0 09:06 09:24 1/3/2020 1/3/2020 0.50 PROD2 DRILL CTOP P PU Test Joint, perform Fuction test 0.0 0.0 09:24 09:54 1/3/2020 1/3/2020 0.60 COMPZ2 CASING PUTB P Prep rig floor for liner ops, PJSM 0.0 0.0 09:54 10:30 1/3/2020 1/3/2020 1.50 COMPZ2 CASING PUTB P PU liner segment #1 (32 jts) 0.0 979.8 10:30 12:00 1/3/2020 1/3/2020 0.50 COMPZ2 CASING PUTB P PU/MU CoilTrak tools, surface test 979.8 1,024.0 12:00 12:30 (good), stab INJH, tag up, reset counters 1/3/2020 1/3/2020 0.25 COMPZ2 CASING RUNL P RIHw/liner segment#1 (32jts 1,024.0 1,099.0 12:30 12:45 slotted), bring pump online 0.3 bpm, Diff=1,942 psi, shut down pump, decision was made to POOH to surface 1/3/2020 1/3/2020 0.70 COMPZ2 CASING RUNL T POOH to surface, PJSM, unstab 1,099.0 979.8 12:45 13:27 INJH, trouble shoot differiential pressure, break off Coil, slide cart back to sump, bring pump online (clear), slide cart to home position, break off GS (clear), break off BHI float sub, break apart inspect checks (clear), LD CoilTrak tools into the pipe shed (clear), All seems to be clear. 1/3/2020 1/3/2020 0.60 COMPZ2 CASING RUNL P PU/MU BHA # 34 979.8 1,024.0 13:27 14:03 1/3/2020 1/3/2020 1.30 COMPZ2 CASING RUNL P RIH w/Liner segment #1, bring pump 1,024.0 7,414.4 14:03 15:21 online 0.35 bpm at 473 psi 1/3/2020 1/3/2020 0.15 COMPZ2 CASING RUNL P Correct to the EOP flag +10.0', PUW 7,414.4 7,424.4 15:21 15:30 30 k 1/3/2020 1/3/2020 1.75 COMPZ2 CASING RUNL P Continued IH towards bottom. 7,424.4 11,643.0 15:30 17:15 Tag bottom 11 643'WOB 1.7 k CT Wt 11 k lbs, Stage pump to 1.5 bpm, diff 1212 psi, PU Wt 26 k lbs WOB 0.4 k lbs "'TOL 10,663.2' 1/3/2020 1/3/2020 2.00 COMPZ2 CASING TRIP P POOH, reset counters & lay in LRP 11,643.0 (T-0- 17:15 19:15 1/3/2020 1/3/2020 0.50 COMPZ2 CASING OWFF P Flow check& LD BHA #34 0.0 0.0 19:15 19:45 Page 37/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 1/3/2020 1/3/2020 1.00 COMPZ2 CASING P RIH w/liner segment #2 (40 jts 0.0 19:45 20:45 slotted), bring pump online 0.3 bpm, Diff=400 psi 1/3/2020 1/4/2020 3.25 COMPZ2 CASING RUNL P RIH w/ liner segment #2 (40 jts)RIH 0.0 6,065.0 20:45 00:00 1/4/2020 1/4/2020 0.10 COMPZ2 CASING RUNL P RIH w/ liner segment #2 (40 jts)RIH 6,065.0 7,660.0 00:00 00:06 1/4/2020 1/4/2020 0.20 COMPZ2 CASING DLOG P Tie into white flag at 7,663'. -4.66' 7,660.0 7,663.0 00:06 00:18 correction 1/4/2020 1/4/2020 1.30 COMPZ2 CASING RUNL P RIH w/ liner segment #2 (40 jts)RIH 7,663.0 10,663.0 00:18 01:36 Continued IH towards bottom. Tag bottom 10,663.2' WOB 1.7 k CT Wt 11 k lbs, Stage pump to 1.5 bpm, diff 1135 psi, PU Wt 27 k lbs WOB 0.4 k lbs ***TOL 9,447.51' 1/4/2020 1/4/2020 2.40 COMPZ2 CASING RUNL P Reset all counters POOH paint TD 10,663.0 44.2 01:36 04:00 flag - 7,854.22' (Yellow) paint window flag at 6044.22' (Red) 1/4/2020 1/4/2020 0.50 COMPZ2 CASING OWFF P At surface, flow check well, PJSM 44.2 44.2 04:00 04:30 1/4/2020 1/4/2020 0.70 COMPZ2 CASING PUTB P LD setting tools 44.2 0.0 04:30 05:12 1/4/2020 1/4/2020 0.30 COMPZ2 CASING PUTB P Prep RF for liner ops 0.0 0.0 05:12 05:30 1/4/2020 1/4/2020 2.20 COMPZ2 CASING PUTB P PU Liner segment#3 (52jts) 0.0 1,587.8 05:30 07:42 1/4/2020 1/4/2020 0.75 COMPZ2 CASING PUTB P PJSM, PU/MU BHI CoilTrak tools, 1,587.8 1,632.0 07:42 08:27 perform surface test (good) 1/4/2020 1/4/2020 1.30 COMPZ2 CASING RUNL P RIH with AL1 liner segment #3 (52 jst 1,632.0 7,734.0 08:27 09:45 slotted) 1/4/2020 1/4/2020 0.20 COMPZ2 CASING RUNL P Correction at the EOP flag minus 7.0', 7,734.0 7,734.0 09:45 09:57 PUW 31 k 1/4/2020 1/4/2020 0.50 COMPZ2 CASING RUNL P Continue IH 7,734.0 9,447.5 09:57 10:27 1/4/2020 1/4/2020 0.20 COMPZ2 CASING RUNL P Tag bottom, PUW 35 k, set back 9,447.5 7,859.8 10:27 10:39 down, bring pump online, 1.58 bpm at 4,240 psi, 1077 diff, PUW 25 k, remove liner length from counters 1/4/2020 1/4/2020 0.20 COMPZ2 CASING RUNL P PUH to logging depth 7,859.8 7,755.0 10:39 10:51 1/4/2020 1/4/2020 0.15 COMPZ2 CASING RUNL P Log the RA marker correction of plus 7,755.0 7,773.0 10:51 11:00 7.0' 1/4/2020 1/4/2020 0.20 COMPZ2 CASING RUNL P RIH, tag TOL @ 7854.5' 7,773.0 7,854.5 11:00 11:12 1/4/2020 1/4/2020 1.20 COMPZ2 CASING TRIP P POOH 7,854.5 44.2 11:12 12:24 1/4/2020 1/4/2020 0.50 COMPZ2 CASING PULD P At surface, check well for flow, PJSM 44.2 44.2 12:24 12:54 1/4/2020 1/4/2020 0.30 COMPZ2 CASING PULD P LD setting tools 44.2 0.0 12:54 13:12 1/4/2020 1/4/2020 0.30 COMPZ2 CASING PUTB P Prep RF for liner ops 0.0 0.0 13:12 13:30 1/4/2020 1/4/2020 0.75 COMPZ2 CASING PUTB P PU/MUALI liner segement #4 (solid 0.0 289.6 13:30 14:15 joints/ swell packer) 1/4/2020 1/4/2020 0.30 COMPZ2 CASING PUTB P PU/MU CoilTrak tools, surface test 289.6 334.2 14:15 14:33 (good) 1/4/2020 1/4/2020 1.50 COMPZ2 CASING RUNL P Tag up, reset counters, RIH 334.2 7,715.0 14:33 16:03 1/4/2020 1/4/2020 0.30 COMPZ2 CASING RUNL P At flag no correction, PUW 7,715.0 7,854.5 16:03 16:21 continue towards bottom Page 38/39 Report Printed: 1/27/2020 Operations Summary (with Timelog Depths) r Y r 3H-01 Rig: NABORS CDR3-AC Job: DRILLING SIDETRACK Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 1/4/2020 1/4/2020 0.20 COMPZ2 CASING RUNL P Tag on depth, PUW 29 k, set back 7,854.5 7,854.0 16:21 16:33 down, bring pump up to 1.5 bpm / 1,237 diff, remove liner length from counters 1/4/2020 1/4/2020 0.75 COMPZ2 CASING DISP P Circulate SW to GS 7,854.0 7,854.0 16:33 17:18 1/4/2020 1/4/2020 0.70 COMPZ2 CASING DISP P POOH, displacing well to SW 7,854.0 2,500.0 17:18 18:00 1/4/2020 1/4/2020 1.00 COMPZ2 CASING FRZP P Pump 30 bbls of diesel to freeze 2,500.0 2,500.0 18:00 19:00 protect 1/4/2020 1/4/2020 1.20 COMPZ2 CASING TRIP P POOH & LD tools 2,500.0 0.0 19:00 20:12 1/4/2020 1/5/2020 3.80 DEMOB WHDBOP RURD P Nipple down, rig down & prep to move 0.0 0.0 20:12 00:00 to 1 R-23 1/5/2020 1/5/2020 1.00 DEMOB WHDBOP RURD P PJSM, change out swab valve 0.0 0.0 00:00 01:00 1/5/2020 1/5/2020 2.00 DEMOB WHDBOP OTHR P Run through rig down check list 0.0 0.0 01:00 03:00 1/5/2020 1/5/2020 1.00 DEMOB WHDBOP NUND P ND BOPE & prep for rig move 0.0 0.0 03:00 04:00 Rig Release @ 04:00am Page 39/39 Report Printed: 1/27/2020 ConocoPhillips ConocoPhillips Alaska Inc—Kuparuk Kuparuk River Unit Kuparuk 3H Pad 3H-01AL1 50-103-20084-60 Baker Hughes INTEQ Definitive Survey Report 16 January, 2020 Baker Hughes S ConocoPhillips a�ke NuB ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 3H-01 Wellbore: 3H-01AL1 Design: 3H-01 AL 1 Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3H-01 Local Co-ordinate Reference: Well 3H-01 TVD Reference: 3H-01 @ 76.00usft (31-1-01) MD Reference: 31-1-01 @ 76.00usft (3H-01) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDT 14 Alaska Production Mean Sea Level Using Well Reference Point Using geodetic scale factor Well Position -NI-S 0.00 usft Northing: 6,000,110.73usft Latitude: +EI -W 0.00 usft Easting: 498,655.44usft Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: Wellbore 3H-01AL1 Magnetics Model Name Sample Date Declination (9 Dip Angle M BGGM2018 12/30/2019 16.20 80.87 Design 3H-01AL1 .,._,�.....�..,.. _.._ Audit Notes: Version: 1.0 Phase: ACTUAL Tie On Depth: 9,635.58 Vertical Section: Depth From (TVD) +N/.S +El -W Direction (usft) (usft) (usft) V) 76.00 0.00 0.00 15.00 70° 24'41.531 N 150'0'39.416W 0.00 usft Field Strength (nT) 57,392 1/182020 8:45.48AM Page 2 COMPASS 5000.14 Build 85H Survey Program Date From ConocoPhillips lldarlfigMs g ConocoPhillips Definitive Survey Report Survey Company: ConocoPhillips Alaska Inc_Kuparuk Local Co-ordinate Reference: Well 3H-01 Project: Kuparuk River Unit TVD Reference: 31-1-01 @ 76.00usft (31-1-01) Site: Kuparuk 3H Pad MD Reference: 31-1-01 @ 76.00usft (3H-01) Well: 31-1-01 North Reference: True Wellbore: 3H-01ALi Survey Calculation Method: Minimum Curvature Design: 3H-01 AL1 Database: EDT 14 Alaska Production Survey Program Date From To Survey Survey (uaft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 100.00 7,750.00 31-1-01 (3H-01) BOSS -GYRO Sperry -Sun BOSS gyro multishot 1/12/2001 Easting 7,763.00 7,846.02 31-1-01A MWD -INC (31-1-01A) MWD -INC -ONLY (INC>10') MWD-INC_ONLY_FILLER ( INC>10°) 12/21/2019 12/21/2019 7,876.27 8,386.85 31-1-01A MWD (31-1-01A) MWD OWSG OWSG MWD - Standard 12/21/2019 12/25/2019 8,392.00 8,420.32 3H-01AL1 PB1 MWD -INC (31-1-01AL1 PB1 MWD -INC -ONLY (INC>10°) MWD -INC -ONLY -FILLER ( INC>10°) 12/24/2019 12/30/2019 8,451.12 9,635.58 3H-01AL1P81 MWD(3H-01AL1PB1) MWD OWSG OWSG MWD - Standard 12/25/2019 12/30/2019 9,641.00 11,606.09 31-1-01AL1 MWD(3H-01AL1) MWD OWSG OWSG MWD - Standard 12/25/2019 1/3/2020 Survey Map Map Vertical i MD Inc AidTVD TVDSS +Nf3 +FJ -W Northing Easting DLS Section S& (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100') Survey Tool Name Annotation (ft) (ft) (ft) 9,635.58 90.71 11.75 5,933.15 5,857.15 -3,344.15 -838.89 5,996,767.06 497,816.03 1.61 -3,447.33 MWD OWSG 11) TIP 9,641-00 90.82 11.81 5,933.08 5,857.08 -3,338.85 -837.79 5,996,772.37 497,817.14 2.31 -3,441.91 MWD OWSG (6) KOP 9,670.50 87.21 13.62 5,933.58 5,857.59 -3,310.08 -831.30 5,996,801.13 497,823.63 13.69 -3,412.45 MWD OWSG (6) 9,700.61 84.86 13.76 5,935.67 5,859.67 -3,280.90 -824.19 5,996,830.31 497,830.74 7.82 -3,382.42 MWD OWSG (6) 9,730.66 82.42 13.81 5,939.00 5,863.00 -3,251.90 -817.07 5,996,859.31 497,837.86 8.12 -3,352.56 MWD OWSG (6) 9,760.52 79.77 14.65 5,943.62 5,867.62 -3,223.30 -809.82 5,996,887.89 497,845.12 9.30 -3,323.07 MWD OWSG (6) 9,791.00 78.87 11.63 5,949.27 5,873.27 -3,194.14 -803.01 5,996,917.05 497,851.93 10.17 -3,293.14 MWD OWSG (6) 9,820.81 80.30 10.60 5,954.66 5,878.66 -3,165.37 -797.36 5,996,94682 497,857.59 5.88 -3,263.89 MWD OWSG (6) ggg 9,851.53 82.60 13.87 5,959.22 5,883.22 -3,135.69 -790.92 5,996,975.49 497,864.03 12.92 -3,233.55 MWD OWSG (6) 9,881.50 85.01 10.61 5,962.46 5,886.46 -3,106.58 -784.61 5,997,004.60 497,870.35 13.48 -3,203.80 MWD OWSG (6) ? 9,919.59 89.05 12.87 5,964.43 5,888.43 -3,069.35 -776.87 5,997,041.83 497,878.10 12.15 -3,165.83 MWD OWSG (6) 1 9,950.69 88.89 11.32 5,964.99 5,888.99 -3,038.94 -770.35 5,997,072.23 497,884.62 5.01 -3,134.78 MWD OWSG (6) 9,979.83 88.37 13.60 5,965.69 5,889.69 -3,010.50 -764.07 5,997,100.67 497,890.90 8.02 -3,105.67 MWD OWSG (6) 10,010.01 87.17 14.22 5,966.86 5,890.86 -2,981.23 -756.82 5,997,129.94 497,898.16 4.47 -3,075.52 MWD OWSG (6) 10,040.35 87.26 16.15 5,968.34 5,892.34 -2,951.98 -748.88 5,997,159.18 497,906.10 6.36 -3,045.22 MWD OWSG (6) 10,070.13 87.57 15.31 5,969.68 5,893.68 -2,923.35 -740.82 5,997,187.81 497,914.17 3.00 -3,015.47 MWD OWSG (6) 10,102.37 90.31 14.31 5,970.28 5,894.28 -2,892.19 -732.58 5,997,218.96 497,922.41 9.05 -2,983.24 MWD OWSG (6) 10,135.79 89.75 13.26 5,970.26 5,894.26 -2,859.73 -724.625,997,251.42 497,930.38 3.56 -2,949.83 MWD OWSG (6) 1/182020 8r45:48AM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc Kuparuk Local Co-ordinate Reference: Well 31-1-01 Project: Kuparuk River Unit ND Reference: 3H-01 @ 76.00usft (31-1-01) Site: Kuparuk 3H Pad MD Reference: 3H-01 @ 76.00usft (3H-01) Well: 3H-01 North Reference: True Wellbore: 3H-01AL1 Survey Calculation Method: Minimum Curvature Design: 311-01AL1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD (usft) Inc (°) A>!1 (°) ND (usft) NDSB (usft) +WS (usft) +FJ•W Wait) Northing Eating DLS (`1100') section Survey Tool Name Annotation (ft) ( ftl (ft) 10,165.37 87.02 14.62 5,971.09 5,895.09 -2,831.04 -717.49 5,997,280.11 497,937.51 10.31 -2,920.27 MWD OWSG (6) 10,195.38 86.50 15.27 5,972.79 5,896.79 -2,802.09 -709.77 5,997,309.05 497,945.24 2.77 -2,890.31 MWD OWSG (6) 10,225.89 WAS 17.67 5,974.74 5,898.74 -2,772.89 -701.14 5,997,338.24 497,953.88 7.93 -2,859.87 MWD OWSG (6) "f 10,254.67 87.88 21.01 5,976.24 5,900.24 -2,745.78 -691.62 5,997,365.35 497,963.40 13.04 -2,831.22 MWD OWSG (6) 10,285.39 89.08 21.11 5,977.05 5,901.05 -2,717.12 1680.58 5,997,394.00 497,974.44 3.92 -2,800.68 MWD OWSG (6) 10,315.63 88.89 21.53 5,977.59 5,901.59 -2,688.95 -669.59 5,997,422.17 497,985.43 1.52 -2,770.63 MWD OWSG (6) 10,345.30 88.31 18.30 5,978.31 5,902.31 -2,661.07 -659.49 5,997,450.04 497,995.54 11.06 -2,741.08 MWD OWSG (6) j 10,375.75 88.74 16.17 5,979.10 5,903.10 -2,632.00 -650.47 5,997,479.11 498,004.56 7.13 -2,710.67 MWD OWSG (6) � 10,405.24 88.59 13.62 5,979.79 5,903.79 -2,603.51 -642.89 5,997,507.60 498,012.14 8.66 -2,681.19 MWD OWSG (6) 10,435.02 89.54 15.95 5,980.27 5,904.27 -2,574.72 -635.29 5,997,536.38 498,019.75 8.45 -2,651.42 MWD OWSG (6) 10,464.97 88.40 15.10 5,980.81 5,904.81 -2,545.87 -627.28 5,997,565.23 498,027.77 4.75 -2,621.47 MWD OWSG (6) 10,490.97 87.36 12.88 5,981.77 5,905.77 -2,520.66 -621.00 5,997,590.43 498,034.05 9.42 -2,595.50 MWD OWSG (6) 10,515.39 87.64 13.75 5,982.84 5,906.84 -2,496.92 -615.38 5,997,614.17 498,039.67 3.74 -2,571.11 MWD OWSG (6) 10,545.03 88.43 12.34 5,983.85 5,907.85 -2,468.06 -608.69 5,997,643.02 498,046.36 5.45 -2,541.51 MWD OWSG (6) f 10,575.24 89.20 13.54 5,984.48 5,908.48 -2,438.63 -601.93 5,997,672.45 498,053.13 4.72 -2,511.32 MWD OWSG (6) 10,605.15 89.75 14.45 5,984.75 5,908.75 -2,409.61 594.70 5,997,701.47 498,060.37 3.55 -2,481.42 MWD OWSG (6) ? 10,635.38 89.69 15.33 5,984.90 5,908.90 -2,380.39 -586.93 5,997,730.68 498,068.14 2.92 -2,451.19 MWD OWSG (6) 10,665.27 89.05 14.57 5,985.23 5,909.23 -2,351.52 -579.22 5,997,759.55 498,075.86 3.32 -2,421.30 MWD OWSG (6) 10,695.62 87.91 14.26 5,986.03 5,910.03 -2,322.13 -571.67 5,997,788.93 498,083.41 3.89 -2,390.97 MWD OWSG (6) 10,725.49 87.05 14.39 5,987.35 5,911.35 -2,293.22 -564.28 5,997,817.84 498,090.80 2.91 -2,361.13 MWD OWSG (6) yy 10,755.07 86.65 14.37 5,988.97 5,912.97 -2,264.61 -556.95 5,997,846.45 498,098.14 1.35 -2,331.59 MWD OWSG (6) 10,784.89 85.81 13.32 5,990.93 5,914.93 -2,235.72 -549.83 5,997,875.33 498,105.26 4.50 -2,30185 MWD OWSG (6) 10,814.87 87.05 12.52 5,992.80 5,916.80 -2,206.56 -543.14 5,997,904.49 498,111.96 4.92 -2,271.94 MWD OWSG (6) 10,845.09 87.79 13.61 5,994.16 5,918.16 -2,177.15 -536.31 5,997,933.90 498,118.79 4.36 -2,241.77 MWD OWSG (6) 10,875.46 89.42 13.33 5,994.90 5,918.90 -2,147.62 -529.24 5,997,963.42 498,125.86 5.45 -2,211.42 MWD OWSG (6) 10,905.31 91.23 13.14 5,994.73 5,918.73 -2,118.57 -522.41 5,997,992.47 498,132.70 6.10 -2,181.59 MWD OWSG (6) 10,940.02 92.03 13.64 5,993.74 5,917.74 -2,084.82 -514.37 5,998,026.21 498,140.74 2.72 -2,146.91 MWD OWSG (6) 10,970.28 93.13 13.27 5,992.38 5,916.38 -2,055.42 -507.34 5,998,055.61 498,147.78 3.83 -2,116.69 MWD OWSG (6) 11,000.25 94.12 12.56 5,990.49 5,914.49 -2,026.26 -500.65 5,998,084.76 498,154.47 4.06 -2,086.80 MWD OWSG (6) 11,030.33 95.10 12.80 5,988.07 5,912.07 -1,997.01 -494.07 5,998,114.01 498,161.06 3.35 -2,056.84 MWD OWSG (6) 11,055.70 96.59 12.50 5,985.48 5,909.48 -1,972.39 -488.55 5,998,138.63 498,166.59 5.99 -2,031.63 MWD OWSG (6) 1/162020 8:45.46AM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips amre,H"he=g ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 3H-01 Wellbore: 3H-01AL1 Design: 3H-01AL1 Survey Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database. Well 3H-01 3H-01 @ 76.0Ousft (3H-01) 3H-01 @ 76.00usft (3H-01) True Minimum Curvature EDT 14 Alaska Production Annotation 1/162020 8.45:48AM Page 5 COMPASS 5000.14 Build 85H Mop Map Vertical MD Intl Inc (°I Axl (°) TVD (usft) TVDSS (usft) +N!-9 (usR) +Ef-W (usft) Northing Easting DLS (°DLS Section Survey Tool Name (R) (ft) (R) 11,086.55 97.18 12.77 5,981.79 5,905.79 -1,942.50 481.85 5,998,168.51 498,173.29 2.10 -2,001.02 MWD OWSG (6) 11,115.25 95.24 11.83 5,978.68 5,902.68 -1,914.63 475.77 5,998,196.38 498,179.37 7.50 -1,972.53 MWD OWSG (6) 11,146.10 93.71 15.30 5,976.27 5,900.27 -1,884.74 .468.56 5,998,226.27 498,186.59 12.26. -1,941.79 MWD OWSG (6) 11,176.62 92.45 16.85 5,974.63 5,898.63 -1,855.45 -460.12 5,998,255.55 498,195.03 6.54 -1,911.32 MWD OWSG (6) 11,207.78 90.92 16.46 5,973.72 5,897.72 -1,825.61 451.19 5,998,285.38 498,203.97 5.07 -1,880.18 MWD OWSG (6) 11,237.48 90.68 15.35 5,973.30 5,897.30 -1,797.05 -443.05 5,998,313.94 498,212.11 3.82 -1,850.49 MWD OWSG (6) 11,265.92 90.06 15.20 5,973.12 5,897.12 -1,769.62 435.56 5,998,341.37 498,219.60 2.24 -1,822.05 MWD OWSG (6) 11,299.25 91.01 14.85 5,972.81 5,896.81 -1,737.43 426.92 5,998,373.55 498,228.25 3.04 -1,788.72 MWD OWSG (6) 11,325.36 92.03 15.48 5,972.12 5,896.12 -1,712.24 420.09 5,998,398.74 498,235.08 4.59 -1,762.62 MWD OWSG (6) 11,349.04 92.18 14.90 5,971.25 5,895.25 -1,689.40 -413.89 5,998,421.57 498,241.28 2.53 -1,738.96 MWD OWSG (6) 11,380.45 92.18 12.96 5,970.05 5,894.05 -1,658.94 406.34 5,998,452.03 498,248.85 6.17 -1,707.58 MWD OWSG (6) 11,405.43 90.74 12.85 5,969.41 5,89341 -1,634.60 400.76 5,998,476.37 498,254.43 5.78 -1,682.63 MWD OWSG (6) 11,430.43 90.46 14.03 5,969.15 5,893.15 -1,610.29 -394.95 5,998,500.68 498,260.24 4.85 -1,657.64 MWD OWSG (6) 11,460.38 87.54 14.19 5,969.68 5,893.68 -1,581.25 -387.65 5,998,529.71 498,267.54 9.76 -1,627.70 MWD OWSG (6) 11,494.25 87.88 15.98 5,971.03 5,895.03 -1,548.57 -378.84 5,998,562.38 498,276.36 5.38 -1,593.86 MWD OWSG (6) 11,520.25 88.80 15.99 5,971.78 5,895.78 -1,523.59 -371.69 5,998,587.36 498,283.52 3.54 -1,567.87 MWD OWSG (6) 11,550.72 88.49 17.19 5,972.50 5,896.50 -1,494.39 -362.99 5,998,616.55 498,292.22 4.07 -1,537.42 MWD OWSG (6) 11,585.50 88.06 17.56 5,973.55 5,897.55 -1,461.22 -352.61 5,998,649.72 498,302.60 1.63 -1,502.69 MWD OWSG (6) 11,606.09 88.59 18.08 5,974.15 5,898.15 -1,441.62 -346.31 5,998,669.31 498,308.91 3.61 -1,482.13 MWD OWSG (6) 11,643.00 88.59 18.08 5,975.06 5,899.06 -1,406.55 -334.86 5,998,704.38 498,320.36 0.00 -1,445.29 PROJECTEDto TD Annotation 1/162020 8.45:48AM Page 5 COMPASS 5000.14 Build 85H l✓ ConocoPhillips ConocoPhillips Alaska Inc—Kuparuk Kuparuk River Unit Kuparuk 3H Pad 3H-01AL1 PBI 50-103-20084-70 Baker Hughes INTEQ Definitive Survey Report 16 January, 2020 Baker Hughes 8 ConocoPhillips eaxn g ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 3H-01 Wellbore: 3H-01AL1 PB1 Design: 3H-01AL1 PB1 Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum Geo Datum: NAD 1927 (NADCON CONUS) Map Zone: Alaska Zone 04 Well 3H-01 Local Coordinate Reference: Well 3H-01 TVD Reference: 31-1-01 @ 76.00usft (3H-01) MD Reference: 31-1-01 @ 76.00usft (3H-01) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDT 14 Alaska Production Well Position -NI-S 0.00 usft Northing: +E/ -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore 3H-01AL1PBl Magnetics Model Name Sample Date Design Audit Notes: Version: Vertical Section: BGGM2018 12/1/2019 3H-01AL1PB1 Mean Sea Level Using Well Reference Point Using geodetic scale factor 6,000,110.73 usft 498,655.44 usft usft Declination l°) 16.24 Latitude: Longitude: Ground Level: Dip Angle 1°) 80.87 1.0 Phase: ACTUAL Tie On Depth: 8,386.85 Depth From (TVD) -W-S +FJ -W Direction (usft) (usft) (usft) 1°I 76.00 0.00 0.00 15.00 70° 24'41.531 N 150° 0'39A113 W 0.00 usft Field Strength (nT) 57,395 1/162020 8:47:49AM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips eaRrwg ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Local Co-ordinate Reference: Well 3H-01 Project: Kuparuk River Unit TVD Reference: 3H-01 @ 76.00usft (31-1-01) Site: Kupamk 3H Pad MD Reference: 31-1-01 @ 76.00usft (31-1-01) Well: 3H-01 North Reference: True Wellbore: 3H-01AL1PB1 Survey Calculation Method: Minimum Curvature Design: 3H-01AL1 PB1 Database: EDT 14 Alaska Production t Survey Program Date 9 From To Survey Survey (usft) (usft) Survey (Wellbore) Tool Name Description Start Date End Date 100.00 s 7,750.00 3H-01 (31-1-01) BOSS -GYRO Sperry -Sun BOSS gyro multishot 1/12/2001 7,763.00 7,846.02 3H -01A MWD -INC (3H -01A) MWD-INC_ONLY (INC>10°) MWD -INC_ ONLY FILLER ( INC>10°) 12/21/2019 12/21/2019 7,876.27 8,386.85 3H -01A MWD (31-1-01A) MWD OWSG OWSG MWD - Standard 12/21/2019 12/25/2019 8,392.00 8,420.32 3H-01AL1PB1 MWD -INC (3H-01AL1 PB1 MWD -INC -ONLY (INC>100) MWD-INC_ONLY_FILLER ( INC>10°) 12/24/2019 12/30/2019 8,451.12 10,920.12 3H-01AL1PBI MWD(3H-01AL1PB1) MWD OWSG OWSG MWD - Standard 12/25/2019 12/30/2019 Survey i y } Map Map Vertical MD Inc Azi TVD TVDSS +W.S +E1 -W Northing DLS Easting Section Survey Tool Name Annotation (usft) {¢ 11 11 (usft) Neill) (usft) (usft) I ('1100' lftl ) lftl 8,386.85 93.87 15.55 5,935.18 5,859.18 4,549.27 -1,156.42 5,995,562.13 497,498.31 8.82 4,693.56 MWD OWSG (3) TIP " 8,392.00 93.26 15.07 5,934.86 5,858.86 4,544.31 -1,155.07 5,995,567.08 497,499.67 15.06 4,688.42 MWD-INC_0NLY(INC>10°)(4) KOP 8,420.32 95.45 14.30 5,932.71 5,856.71 4,517.00 -1,147.91 5,995,594.39 497,506.83 8.19 4,660.18 MWD-INC_ONLY (INC>10°)(4) Interpolated Azimuth 8,451.12 97.33 13.75 5,929.28 5,853.28 4,487.30 -1,140.49 5,995,624.08 497,514.26 6.36 4,629.58 MWD OWSG (5) 8,480.89 96.84 14.42 5,925.61 5,849.61 4,458.65 -1,133.30 5,995,652.73 497,521.45 2.77 4,600.04 MWD OWSG (5) 8,510.75 96.94 15.57 5,922.02 5,846.02 4,430.01 -1,125.63 5,995,681.36 497,529.12 3.84 4,570.40 MWD OWSG (5) E8,539.81 95.42 15.32 5,918.90 5,842.90 4,402.17 -1,117.94 5,995,709.21 497,536.82 5.30 4,541.51 MWD OWSG (5) 8,569.78 93.69 14.65 5,916.52 5,840.52 4,373.31 -1,110.21 5,995,738.06 497,544.55 6.19 4,511.63 MWD OWSG(5) i 8,599.26 94.09 14.50 5,914.52 5,838.52 4,344.84 -1,102.81 5,995,766.52 497,551.96 1.45 4,482.22 MWD OWSG (5) { 8,629.26 93.04 14.14 5,912.65 5,836.65 4,315.83 -1,095.41 5,995,795.53 497,559.37 3.70 4,452.28 MWD OWSG (5) i 8,665.78 92.16 14.37 5,910.99 5,834.99 4,280.47 -1,086.42 5,995,830.88 497,568.35 2.49 4,415.81 MWD OWSG (5) 8,695.30 89.26 14.12 5,910.63 5,834.63 4,251.86 -1,079.16 5,995,859.48 497,575.62 9.86 4,386.29 MWD OWSG (5) 8,724.96 84.74 13.95 5,912.18 5,836.18 4,223.14 -1,071.98 5,995,888.21 497,582.81 15.25 4,356.69 MWD OWSG (5) 8,755.70 83.93 14.15 5,915.21 5,839.21 4,193.46 -1,064.55 5,995,917.88 497,590.24 2.71 4,326.10 MWD OWSG (5) 8,790.54 84.12 14.31 5,918.84 5,842.84 4,159.88 -1,056.04 5,995,951.46 497,598.76 0.71 4,291.45 MWD OWSG (5) 8,820.73 84.36 13.65 5,921.87 5,845.87 4,130.73 -1,048.78 5,995,980.60 497,606.02 2.32 4,261.42 MWD OWSG (5) 8,850.89 85.44 13.04 5,924.55 5,848.55 4,101.50 -1,041.85 5,996,009.83 497,612.96 4.11 4,231.39 MWD OWSG (5) 8,880.78 8776 12.74 5,926.32 5,850.32 -4,072.42 -1,035.19 5,996,038.91 497,619.62 7.83 4,201.58 MWD OWSG (5) 8,910.64 88.74 14.40 5,927.24 5,851.24 -4,043.40 -1,028.19 5,996,067.92 497,626.63 6.45 -4,171.74 MWD OWSG (5) 1/162020 8:47.49AM Page 3 COMPASS 5000. 14 Budd 65H Survey ConocoPhillips B kerMu9- ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc Kuparuk Local Co-ordinate Reference: Well 31-1-01 Project: Kuparuk River Unit ND Reference: 31-1-01 @ 76.00usft (31-1-01) Site: Kuparuk 3H Pad MD Reference: 31-1-01 @ 76.00usft (31-1-01) Well: 31-1-01 North Reference: True Wellbore: 3H-01AL1PB1 Survey Calculation Method: Minimum Curvature Design: 3H-01AL1PB1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD (usft) Inc (") AN 11 ND (usft) TVDSS (usft) +NIS (usft) +�_yy (usft) Northing Easting DLS (0)100) Section Survey Tool Name Annotation Ift) (ft) (ft) 8,941.06 89.05 15.04 5,927.62 5,851.82 44013.99 -1,020.46 5,996,097.33 497,634.36 2.34 -4,141.33 MWD OWSG (5) 8,971.04 89.11 15.05 5,928.30 5,852.30 -3,985.04 -1,012.68 5,996,126.27 497,642.15 0.20 4,111,35 MWD OWSG (5) 9,000.88 88.99 14.84 5,928.80 5,852.80 -3,956.21 -1,004.98 5,996,155.09 497,649.84 0.81 4,081.52 MWD OWSG (5) 9,030.72 89.57 16.60 5,929.17 5,853.17 -3,927.49 -996.90 5,996,183.81 497,657.93 6.21 -4,051.68 MWD OWSG (5) 9,060.82 88.89 16.61 5,929.58 5,853.58 -3,898.65 -988.30 5,996,212.65 497,666.54 2.26 4,021.60 MWD OWSG (5) 9,090.53 88.13 16.44 5,930.35 5,854.35 -3,870.18 -979.85 5,996,241.12 497,674.99 2.62 -3,99191 MWD OWSG (5) 9,120.86 86.81 17.80 5,931.69 5,855.69 -3,841.22 -970.93 5,996,270.07 497,683.91 6.25 -3,961.63 MWD OWSG (5) 9,155.85 86.77 18.02 5,933.65 5,857.65 -3,807.98 -960.19 5,996,303.30 497,694.66 0.64 -3,926.74 MWD OWSG (5) 9,181.33 88.77 16.81 5,934.64 5,858.64 -3,783.69 -952.57 5,996,327.59 497,702.28 9.17 -3,901.30 MWD OWSG (5) 9,210.70 89.63 16.73 5,935.05 5,859.05 -3,755.57 -944.10 5,996,355.71 497,710.76 2.94 -3,871.95 MWD OWSG (5) 9,240.62 91.41 16.03 5,934.78 5,858.78 -3,726.87 -935.66 5,996,384.41 497,719.20 6.39 -3,842.04 MWD OWSG (5) ( 9,270.37 91.90 15.65 5,933.92 5,85292 -3,698.26 -927.54 5,996,413.01 497,727.32 2.08 -3,812.31 MWD OWSG (5) 9,302.53 91.13 15.44 5,933.07 5,857.07 -3,667.28 -918.93 5,996,443.98 497,735.95 2.48 -3,780.16 MWD OWSG (5) 9,330.51 90.98 15.69 5,932.55 5,856.55 -3,640.34 -911.42 5,996,470.92 497,743.46 1.04 -3,752.19 MWD OWSG (5) 9,365.11 88.65 15.31 5,932.67 5,856.67 -3,607.00 -902.17 5,996,504.26 497,752.71 6.82 -3,717.59 MWD OWSG (5) 9,390.51 88.22 15.10 5,933.36 5,857.36 -3,582.49 -895.51 5,996,528.75 497,759.37 1.88 -3,692.20 MWD OWSG(5) 9,420.58 90.34 15.25 5,933.74 5,857.74 -3,553.48 -887.64 5,996,557.77 497,767.24 7.07 -3,662.13 MWD OWSG (5) 9,450.56 90.61 14.76 5,933.49 5,857.49 -3,524.52 -879.88 5,996,586.72 497,775.01 1.87 -3,632.16 MWD OWSG (5) 9,480.29 90.43 14.65 5,933.22 5,857.22 -3,495.77 -872.34 5,996,615.47 497,782.56 0.71 -3,602.43 MWD OWSG (5) p( ry 9510.30 89.79 14.10 5,933.16 5,857.16 -3,466.70 -864.89 5,996,644.54 497,790.02 2.81 -3,572.42 MWD OWSG (5) 9,54652 89.97 11.97 5,933.22 5,857.22 -3,437.26 -858.07 5,996,673.97 497,796.84 7.07 -3,542.22 MWD OWSG (5) y1, 9,570.47 89.51 11.00 5,933.36 5,857.36 -3,407.91 -852.11 5,996,703.32 497,802.80 3.58 -3,512.33 MWD OWSG (5) 9,600.83 90.22 12.02 5,933.43 5,857.43 -3,378.16 -846.05 5,996,733.06 497,808.87 4.09 -3,482.02 MWD OWSG (5) 9,635.58 90.71 11.75 5,933.15 5,857.15 -3,344.15 -838.89 5,996,767.06 497,816.03 1.61 -3,447.33 MWD OWSG(5) 9,660.40 91.20 12.00 5,932.74 5,856.74 -3,319.87 -833.79 5,996,791.34 497,821.14 2.22 -3,422.55 MWD OWSG (5) 9,690.52 F 91.84 13.61 5,931.94 5,855.94 -3,290.51 -827.11 5,996,820.70 497,827.82 5.75 -3,392.46 MWD OWSG (5) 9,720.29 91.51 14.99 5,931.07 5,855.07 -3,261.67 -819.76 5,996,849.53 497,835.17 4.76 -3,362.71 MWD OWSG (5) 9,750.00 90.49 15.97 5,930.55 5,854.55 -3,233.05 -811.84 5,996,878.15 497,843.10 4.76 -3,333.00 MWD OWSG (5) 9,780.41 89.72 1679 5,930.49 5,854.49 -3,203.87 -803.26 5,996,907.32 497,851.68 3.70 -3,302.60 MWD OWSG (5) 9,810.18 87.82 16.52 5,931.13 5,855.13 -3,175.36 -794.73 5,996,935.83 497,860.22 6.45 -3,272.85 MWD OWSG (5) 9,835.20 87.51 16.87 5,932.15 5,856.15 -3,151.41 -787.55 5,996,959.77 497,867.40 1.87 -3,24286 MWD OWSG (5) 11162020 8:47.49AM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips sake, Hughes 2�t ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc_Kuparuk Local Coordinate Reference: Well 31-1-01 Project: Kuparuk River Unit TVD Reference: 3H-01 Q 76.00usft (31-1-01) Site: Kuparuk 3H Pad MD Reference: 31-1-011 @ 76.00usft (3H-01) Well: 3H-01 North Reference: True Wellbore: 31-1-01AL1P131 Survey Calculation Method: Minimum Curvature Design: 31-1-01AL1P131 Database: EDT 14 Alaska Production Survey Map Map Vertical MD (usft) Inc (°) Azl r) TVD (usft) TVD33 (usft) +N/S (usft) +E/41 (usft) Notting Ea( ting DLS (°1100') Section Survey Tool Name Annotation (ft) ( (ft) (ft) 9,865.66 88.31 17.35 5,933.26 5,857.26 -3,122.32 -778.59 5,996,988.86 497,876.36 3.06 -3,217.45 MWD OWSG (5) 9,895.29 88.06 16.61 5,934.20 5,858.20 -3,094.00 -769.94 5,997,017.18 497,885.02 2.63 -3,187.85 MWD OWSG (5) 9,930.04 1 87.91 16.13 5,935.42 5,859.42 -3,060.68 -760.16 5,997,050.50 497,894.81 1.45 -3,153.13 MWD OWSG (5) b 9,960.31 8254 14.91 5,936.62 5,860.62 -3,03153 -752.06 5,997,079.63 497,902.91 4.21 -3,122.89 MWD OWSG (5) E$ 9,990.28 87.88 13.21 5,937.82 5,861.82 -3,002.49 -744.79 5,997,108.68 497,910.19 5.78 -3,092.94 MWD OWSG (5) s 10,020.24 88.43 11.52 5,938.79 5,862.79 -2,973.24 -738.38 5,997,137.92 497,916.60 5.93 -3,063.03 MWD OWSG (5) ti 10,050.12 89.11 10.30 5,939.43 5,863.43 -2,943.91 -732.72 5,997,167.25 497,922.26 4.67 -3,033.24 MWD OWSG (5) 10,080.11 87.63 9.78 5,940.28 5,864.28 -2,914.39 -727.50 5,997,196.76 497,927.49 5.23 -3,003.37 MWD OWSG (5) 10,105.12 86.86 &a4 5,941.48 5,865.48 -2,889.74 -723.45 5,997,221.41 497,931.54 4.86 -2,978.51 MWD OWSG (5) 10,140.11 3 86.43 7.24 5,943.53 5,867.53 -2,855.15 -718.57 5,997,255.99 497,936.43 4.73 -2,943.84 MWD OWSG (5) 10,169.96 86.25 6.36 5,945.44 5,869.44 -2,825.57 -715.04 5,997,285.57 497939.96 3.00 -2,914.36 MWD OWSG (5) 10,200.03 86.03 5.63 5,947.46 5,871.46 -2,795.73 -711.91 5,997,315.40 497,943.10 2.53 -2,884.73 MWD OWSG (5) y 10,226.35 85.51 4.81 5,949.40 5,873.40 -2,769.59 -709.52 5,997,341.54 497,945.49 3.68 -2,858.86 MWD OWSG (5) 10,261.17 84.27 4.62 5,952.50 5,876.50 -2,735.03 -706.67 5,997,376.10 497,948.35 3.60 -2,824.74 MWD OWSG (5) 10,290.11 84.37 6.86 5,955.37 5,879.37 -2,706.38 -703.79 5,997,404.75 497,951.23 7.71 -2,796.32 MWD OWSG (5) 10,325.37 85.81 3.76 5,958.39 5,882.39 -2,671.40 -700.54 5,997,439.72 497,954.49 9.66 -2,761.69 MWD OWSG (5) fi 10,361.06 87.17 6.96 5,960.57 5,884.51 -2,635.94 -697.21 5,997,475.18 497,957.82 9.73 -2,726.58 MWD OWSG (5) 10,390.82 88.00 10.08 5,961.83 5,885.83 -2,606.54 -692.81 5,997,504.57 497,962.23 10.84 -2,697.04 MWD OWSG (5) 10,415.14 1920. 9.93 5,962.42 5,886.42 -2,582.60 188.58 5,997,528.51 497,966.46 4.97 1,672.82 MWD OWSG (5) j i 10,440.36 88.93 11.39 5,962.83 5,886.83 -2,557.82 -683.92 5,997,553.29 497,971.13 5.89 -2,647.67 MWD OWSG (5) 10,480.09 90.64 11.76 5,962.98 5,886.98 -2,518.90 -675.95 5,997,592.21 497,979.11 4.40 -2,608.02 MWD OWSG (5) 10,510.00 92.80 11.83 5,962.08 5,886.08 -2,489.63 -669.84 5,997,621.47 497,985.22 7.23 -2,578.17 MWD OWSG (5) 10,539.65 94.48 11.86 5,960.19 5,884.19 -2,460.48 -663.72 5,997,650.62 497,991.34 5.63 -2,548.42 MWD OWSG (5) 10,569.88 96.18 11.17 5,957.40 5,881.40 -2,431.18 -657.75 5,997,679.91 497,997.31 6.11 -2,518.58 MWD OWSG (5) 10,599.84 9467 12.12 5,954.57 5,878.57 -2,401.97 151.73 5,997,709.12 498,003.34 5.95 -2,488.81 MWD OWSG(5) 10,630.16 93.87 13.00 5,952.31 5,876.31 1,372.46 15.16 5,997,738.62 498,009.92 3.92 -2,458.60 MWD OWSG(5) 10,660.12 91.81 13.76 5,950.82 5,874.82 -2,343.35 -638.23 5,997,767.73 498,016.85 7.33 -2,428.69 MWD OWSG (5) 10,696.02 87.57 13.39 5,951.02 5,875.02 -2,308.46 -629.81 5,997,802.61 498,025.28 11.86 -2,392.81 MWD OWSG (5) 10,720.16 87.15 13.45 5,952.13 5,876.13 -2,285.01 -624.21 5,997,826.06 498,030.88 1.76 -2,368.71 MWD OWSG (5) 10,750.19 86.28 13.84 5,953.85 5,877.85 -2,255.87 -617.14 5,997,855.19 498,037.95 3.17 -2,338.73 MWD OWSG (5) 10,780.17 84.59 14.73 5,956.24 5,880.24 -2,226.91 -609.77 5,997,884.15 498,045.33 6.37 -2,308.85 MWD OWSG (5) 11162020 8 47.49AM Page 5 COMPASS 5000.14 Build 65H ConocoPhillips sok- ugn-8 ConocoPhillips Definitive Survey Report Company: ConocoPhillips Alaska Inc Kuparuk Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 31-1-01 Wellbore: 3H-OtAL1 PB 1 Design: 3H-01AL1PB1 Survey Local Co-ordinate Reference: Well 31-1-01 TVD Reference: 31-1-01 @ 76.00usft (31-1-01) MD Reference: 31-1-01 @ 76.00usft (31-1-01) North Reference: True Survey Calculation Method: Minimum Curvature Database: EDT 14 Alaska Production 1/162020 8.47.,49AM Page 6 COMPASS 5000.14 Build 85H Map Map Vertical MD (usft) Inc 1°) Axl 11 TVD (usft) TVOSS (usft) +N1S (tuft) *H -W (usft) Northing Ea DLS (=1100') Section Survey Tool Name Annotation (ft) sting lftl lftl 10,810.24 85.05 14.47 5,958.95 5,882.95 -2,197.93 -602.22 5,997,913.12 498,052.89 1.76 -2,278.91 MWD OWSG(5) 10,840.11 83.75 15.03 5,961.87 5,885.87 -2,169.19 -594.65 5,997,941.87 498,060.46 4.74 -2,249.18 MWD OWSG (5) 10,875.04 85.24 16.23 5,965.22 5,889.22 -2,135.70 -585.28 5,997,975.34 498,069.83 5.47 -2,214.41 MWD OWSG(5) 10,905.12 86.71 15.98 5,967.33 5,891.33 -2,106.88 -576.96 5,998,004.17 498,078.16 4.96 -2,18441 MWD OWSG(5) 10,920.12 87.42 15.78 5,968.10 5,892.10 -2,092.47 -572.86 5,998,018.57 498,082.26 4.92 -2,169.44 MWD OWSG(5) 10,961.00 87.42 15.78 5,969.94 5,893.94 -2,053.17 -561.75 5,998,057.87 498,093.37 0.00 -2,12860 PROJECTEDto TD 1/162020 8.47.,49AM Page 6 COMPASS 5000.14 Build 85H Baker cl;,�: PRINT Hughes COMPANY ConocoPhillips Alaska, Inc. WELL NAME 314-01AL1PB1 FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. Ride r(a)_bakerhughes.com 1 STATUS Final COMPANY 21 91 59 319542 DISTRIBUTION LIST Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp (WNS Petroleum Technician) 700 G Street. Anchorage, Alaska 99510 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE December 30, 2019 TODAYS DATE January 21, 2020 Revision Replacement: No Details: Rev. Requested by: --- FIELD I FINAL CD/DVD FINAL PRELIM GS (las, dlis, PDF, META, SURVEY REPORT CGM, Final Surveys) (Compass) # OF PRINTS 4 # OF COPIES # OF COPIES # OF COPIES ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) LOGS LO PERSON ATTENTION 4 4 4 4 BP North Slope. EOA. PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage, Alaska 99508 2 (ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99_510 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 IECEIVED IAN 2 3 2020 4 State of Alaska - AOGCC 1 1 Attn: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR -Division of Oil & Gas *** 1 Attn: Resource Evaluation '550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-1 900 E. Benson Blvd. Anchorage, Alaska 99508 TOTALS FOR THIS PAGE: 0 1 2 0 0 9159 Baker 5�1 PRINT DISTRIBUTION LIST 31951 Hughes COMPANY ConocoPhillips Alaska, Inc. WELL NAME 3H-01ALI FIELD Greater Kuparuk Area COUNTY North Slope Borough BHI DISTRICT Alaska AUTHORIZED BY Patrick Rider EMAIL Patrick. RiderCa)bakerhughes.com STATUS Final Replacement: COMPANY ADDRESS (FEDEX WILL NOT DELIVER TO P.O. BOX) PERSON ATTENTION 1 BP North Slope. EOA. PBOC, PRB-20 (Office 109) D&GWO Wells Admin Brenda Glassmaker & Peggy O'Neill 900 E. Benson Blvd. Anchorage. Alaska 99508 2 ConocoPhillips Alaska Inc. Attn: Ricky Elgarico ATO 708 700 G Street Anchorage, AK 99510 3 ExxonMobil, Alaska Attn: Lynda M. Yaskell and/or Leonardo Elias 3201 C Street, Suite 505 Anchorage, AK 99503 Please sign and return one copy of this transmittal form to: ConocoPhillips Alaska, Inc. Tom Osterkamp (WNS Petroleum Technician) 700 G Street. Anchorage, Alaska 99510 to acknowledge receipt of this data. LOG TYPE GR - RES LOG DATE January 3, 2020 TODAYS DATE January 21, 2020 Revision No Details: Rev. Requested by: --- FIELD / FINAL CD/DVD FINAL PRELIM LOGS (las, dlis, PDF, META, j SURVEY REPORT LOGS CGM, Final Surveys) (Compass) # OF PRINTS # OF COPIES # OF COPIES 1# OF COPIES 'rf fi— 14w, " J `L, y - JAN 2 3 2020 4 State of Alaska - AOGCC 1 1 Attn: Natural Resources Technician II 333 W. 7th Ave, Suite 100 Anchorage, Alaska 99501 5 DNR - Division of Oil & Gas *** Attn: Resource Evaluation 550 West 7th Avenue, Suite 1100 Anchorage, Alaska 99501 *** Stamp "confidential" on all material deliver to DNR 6 BP Exploration (Alaska) Inc. Petrotechnical Data Center, LR2-I 900 E. Benson Blvd. Anchorage, Alaska 99508 1 TOTALS FOR THIS PAGE: 0 1 2 0 0 l01 Baker Hughes � I Date: January 16, 2020 Abby Bell AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 21 9 159 3 193 5 Letter of Transmittal Harvey Finch Baker Hughes 795 East 94th Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3H -01A 3H-01AL1PB1 3H-01AL1 JAN 17 2,920 AC (3) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Harvey Finch Baker Hughes Wellplanner Harvey.Finch@bakerhughes.com v h CD (D CD �o cD Ma 0 owl 00 CD I /"1 mzT /T U) Z J m @9 Q yj 0 0 VI 0 L 0 riO \ £ & » e E 2 ¥ f % ¥ ƒ ƒ w E £ @ ■ n R \ 3 ( § - \\ m - \ 3 0. o 0 ' « \ ( \ \ �Z \ \ / ( 0 0 CD( /).. \ \ \ / CD N ° ® o /\\ � \ ) / \} \ ( : ( } _ D - 2 ` n Cl) / k 2 0/ $ _ & f .. ; ID CL % ( - ° } ■ » f ® 7 5 [ \ 6 6 > ° ) p \ / `z g a 2 e > } \ o§ ::E' d Z < \ = z CL\ kkk = 7 \ 2/ e a 0 § @ E - i) % C) E � =c< ( § / \\ [ \ *(/ \ ( \ \ \ \ ( \ 0 CD( \ \ \ / CD ® o r�j ch � \ ) \} \ ( ( } D - 2 ` Cl) / 2 0/ $ _ & ; ID CL % ( = 7 \ 2/ e a 0 § @ E i) % E � =c< ( § / 0 \\§ *(/ ( \ \ \ / CD ® o � ƒ \} \ = 7 \ 2/ e a 0 § @ E i) % « \ ( § / 0 § n ® o � ƒ \ D - 2 .. / V N O O O O O c0 0 0 0 0 c0 c0 m c0 c0 w w 0 0 3 Op O (0 l0 Ql m m V J V J m m m W O V A J p cn m Ut N m m W O V j W x (n N O O O t0 O c0 O O O O O N W W O m m 05 N m m O m m m O N Cp J W Ut W t0 0 O W O N O 0 O O m m c0 m W m m m W m m m V V m W m (0 (0 ^ 3 c0 O J V V m m l0 N N (OJ m cD N A J O O .... n CJO J m wm w m m N w A A W w w w w er O O tD m m Ut A A N c0 A 0 W cD Ut W W W N N m W m m c0 A A N m N m O m N O -+ m m m A m t0 c0 W m N m J N O J m m N V� m O1 N cn N N N (n N U N N Ut m m Ut N C cmo cm0 cm0 cm0 cOcppD m mmpapppl Am0pp m V V m m (mn (mn (mn (mn y A A W N O cD m OD 01 W W W J W c0 J J J N N m W m c0 A A N m N m O m cn O m m m Am m cD to W m N m V N O J c0 m N N N N N N W W W W W W W W W W W W W Z cUO� N w O w 3 001 NN d w O O m A N J W N m W N m W -� W t0 c0 O m m 0 � W c0 m m W O A N m c0 V A O O O m N N c + w m J J J J J J J J J J J W bJ OD � LD EO m e C N W A AOT m V J m c0 c0 O N � W W GG A N O m m A O m A O V W'00 J A J m m N m m m O W m m c0 W O m O W V m N m N m N V m V N m N V cp O t0 cD (n Ut Ut N N Ut N V• NUt N N N N N tr (n N Z O m .m O O O O cop O O^ 0 J cp t0 -4 cD c0 (D cD c0 cD c0 (D m m w [O T w w d J J J J J J J J m m V cp c0 O N A Ut N J J (0 O N J � N w m A V w w O w N (011 cm0 W V 001 A A A A A A A A A A A A A A A A A A pmt c0 tD [O cp c0 c0 c0 c0 c0 c0 c0 c0 c0 r. .Nr S' J J V V V V V V V V V V V V J V J x pl iO cO cO ippO V 1 1 1 1 1cm�pp au pmppp m m pmt m m m m m o� a, m `-' � 'o O N A m OD O A m O .ta J N v O w J m J O m O N O N W c0 W N m A W A W W c0 W m A m m N W N N O 0 m V W N r cn O O A O O A m m W m m 1 m O Cn m Ut O m V N cT m N m J O N N c0 cn < N N W pWp W W W W W W W W W W 6 &1 6A 6A 0 N O w m c0 W N U N N A W W W W W N N N V = N m N A IJ N m V m m m N m O m A A (D W W A V N N J m W O N N A V m N m W 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 :E g:Eg g (n w m N m w W w W W W W O G7 L7 L7 L7 0 0 0 G7 O O O O O O 0 0 0 0 O m m m w m m m m m m m m m m m m m <n z 3 co ?� - u3 0 ET 0 NN N N N -t O N conn ccnn A zt Z c N O O O W O W N N N N j Cn i W w o g 0 m 0 D m m� J yA [D (0 a 0 n iD O A W O N M J 01 J m W p p C 7 yO ,� LO O Q 0 n a N O .. O N O —I O O O O 2 2 2 c C O 3 0 a1 m a W w J Oo V v w o O D O D O O '�• p .vWi cn W o w N m au cn m 0 N o 0 O = G _ �0 Q C D »' d W O W O W O W O W 0 W o fn <D cn D D D D DO j r �: r K K W v W W o o o a v = z (7 o w Z y 2 o � D D 2 O_ � ao D j W O O O O o 0 0 c � O W z -1 r O O Z Ci O Z ci GI C 3 m A A C A p0_ 0 G) G) 10 G) 10 N p K n Z Z N CD O Z 0 Z 0 d ^. 0 til m N O m N Cn n C 0 0O O 0 (DA I C CD __ a @ - N O O O K O K C O p p (D fin CA Cin n c1 c1 m 3 _ _ pD IO O IO m m o o cn cn Z cn ZW O) D (P @ T =. =3 1T =3 T Cl)f(0 C W 0V) r d F r o m 2 0 0 0 0 0 o. n m a 171 0 x x C7 O n O 0 O 2 0 2 0 NN N N N -t O N conn ccnn A zt Z c N O O O W O W N N N N j Cn W W N N a C [D (0 [0 c0 c c m 3 N 0 0 0 0 0 0 m m m OD m m m t m m m m m m m m m m m m m m r CA O = = w m 0 c O m m A W N 0 V V m m v J 0 0 0 0 m V J N 0 CO aJ Co m 0 V m m N m m p 0 0 d Op 0 O N W W W N (D O m m m m O (O U O m U 0 J U N O AA W W O V(� m V A 0 A j W 0 O m m 8 OD m 8 O O N C v O o O O O o O o o O O o O O D W �(Opp W O V N QmOM N W O V (oJ� pAOI m O O O O N U (ll A OJo (J1� A U (UO U U U U U U U N O V O W N N O W U m N A m O W 0 V m O 0 v A m 0 N N W v m U N A O W W 0 0 V 0 O N v N A V W m O m W m W 0 J m W 0 m W V 0 0 0 0 0 0 m m m OD m m m m m m m m m m m m m m m m m m m W m ^ 7 S = = c c O m m A W N 0 V V m m v J 0 0 0 0 m V J N 0 CO aJ Co m 0 V m m V .... O O O O 0 d Op 0 O N W W W N (D O m m m m O (O U O m U 0 J U N O AA W W O V(� m V A 0 A j W 0 O m m 8 OD m 8 O O N D D N 2- -74 Q C J m A D F d 7 m U U U U U U m U U U U U U (T (T U (1( U U U U U U _ U C71 t0 m jn {Up m m m m m m m m m m 000 m m m {(Jp( m W {(pT N W �4p( �Up m m m tJD J (JD (VO (JD (VD 1 J0 (VO m m O N W A a s N O m J m U A A A W N O O (O (0 au J J m A N A O A W JV 0 m 0 0 W O N 0 V A m m V m N J m O N J J O C W J 0 m A W O m O W J U W W O m 0 U A V V 10 O 0 U a A 0 0 U m U O( U m U 4( U U (T U U U m U m m m U U m m m (J( U U m (J( (J( U C G A O A W V V 0 co 0 0 W O N 10 J A m m J Q N V W m O N J V O m J 0 m A W O m O W J U W W O U m U A V V 0 O 0 m A A 0 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N w Z 0 0 O O O — IV " N N W W W A A A A U U m m m OW m J v m W 0 N m m A J O W 0 N m O W m 0 N A V O W m m A J O w N J m m A m V J m m W N O o m m m O U A W N m V m N N W m m O 0 m m V O O 0 -+ V m O O (C� m N N V N U m N N W N 0 W m N m V N O V U N m 0 0 A N NNW mTvmOO jNW � A Spt U V m m O O �OO vm'im m 0 V (ml( 0cn V ( d V A A A W m W V N W O W (m0 W O W W N V (AD (m0 m N A V (AO m U U U U Cl U m m m m O( Cn m U 4( CA U U U U U U U U m U m m m m OZ 0 0 0 (0 0 0 0 0 0 0 0 w <O 0 0 * 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W W 00 W 0 0 0 0 0 0 0 0 0 0 0 0 0V J 0 0 0 m J J V V J :-4 V V J V V J O O O 0 0 0 0 m m m V J V V m m m m U U U A A A W W W W N 3 W A A N m N W W A N V m (UO O N W A O N m (VO O N A m m W OLa m O V m y d A 0 A W A m 0 U m A d O A N W m O O W Iv O A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 0m m pmtt m p m N m m m m m m m m N m m m WW m W 00 pW m A v O N N W - N m O m O O O W A N 0 N A N N A W W UAi 41 v= a 0 0 m J m A O m 0 m m A O m A J W m J U V U A m A W A O m A Cn W A W N m m A A A N W W N W A U W 0 A m m J W W V N O .a r _ _ pp pp (n (gyp ( m W o N O VAi m N O U 0 N N N N (AT A N U Vai m W m N N A W V -W+ ` (nG N N N N N N N N N N N N N N N N N NN N N N6 N6 N N N6 N N N N N. 9 O O O j N N W W m W A A A U A U U m m m V V m OD OD W 0 .rY' m m A m O W 0 V O 0 U 0 O m m O] O) O Ut O O O c0 O O 0 m m m m 0 U A V 0 m U 0 W A W m U A A T O m N m W N W A O 0 -• 0 N V A U 0 W V O 0 N N w -� -+ O J N 0 V m W m 0 00 0 0 0 0 d d 0 d 0 0 0 d 0 d 0 d 0 d 0 0 0 C0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O 0 0 0 0 0 (D O G7 G1 G7 G7 G7 O O (.) O (.) 47 G7 G7 G7 G7 G7 G7 G7 47 47 G7 G7 G7 G1 G7 Gl O t) 67 G7 O rn m rn rn rn m m rn rn oD m rn rn m m rn oD m orn rn w rn rn m rn rn m m rn m m Z m 3 m v a o o o m n A m W O N O C m n m r! @ O (p 7 �s (D .mr W O CL 0 m m g :� w w o c S = m O O W y 3 CP �iP - oc 2 O O N O O a c w w 4 S 2 j O O m r N N A Ut A a r i ._ _.... .._ .._ _._. .__... ..._... .... y... O.. 0 2 N A N p A O N N m N m W O 100 W m U O O A WW O O O U O A lN0 0 U 0 U V V J A 0) (D U 0) O O U V N N W A A A O W N 0 A O] N A V U -+N N U O 0 O N U U W W w U U m m O U U w w w n w w aD aD au au oD co co co co co � m m m co co co co ; � 2 Z 2 c c 0 W W OD OD 00 V U U0 A Qu 00 m V O (J� O N J N N O OW O m O O 0 m N W U A N V v n O O O p�j dpi =O 0 0 O Ql A A 0 OD N U A DD w A ? — _ R a j D OW OD OOD T 0 (00 m 0 (Ole m O m N O F N 7 10 U U U U U �-n U U U U U U U U U U U U U U C 10 0 W J O) N U J 2 U U U O OJ W 0 U U U N N O N W J W 0 U U U U U U U U U U U U U U U U U U U U C 0 W au CD CD N W N N 00 N W W O N OD au 0 0 0 N Q t00 000 J m N m W W W A (Wli m � V (JO V W O N OU �� O U U J O Q) A O N m W V O N O V A A A A U U U O) 01 01 W -1 iV �I v Uf CU 00 c0 (D O A O c0 N A 0D W U w N w O w N U OJ A 'vx 01 A W OD O A m (D v (p V U U A A N U CD N W U U N N 0 0 A N A 0) O W A v m U U N N 0 0 J U 0 O A O A W N U U A w O WW W }a L A m N Cm V L W x C A Q7 N N W J A O O W O W U W O 0o U 07 W 0 Ln 01 0 V W CD O 0 U O U V W D7 0 0 0 A U U 47 A 0 0 N U U 0 N O V U U U U (n (, U U 4t (n U U U U U U U U U U U Z 0 0 f0 �0p 0 �0p �tp0 t0 0 0 OW W m m m m m 000 D W 900 900 9DD Ou W OOD OOD 0W ,000 m O U A 00 O N O V U 0 V N U N 0 m A 0 0 U V N 0 O U N W W W U Ut Q) m m W V U W W W W O U J U W 0 W U N W U 0 N U O W OD J W J A U V A W U V QD A A A A A A A A A A A A A A A A A A A A N W W W N N N N N (NP O m 0 N W m V m A � A m W 0 N 0 (OT Ol (JD W v {C W 0 W N U W U N A 00 N O N m 0 O U W N O w A W N 0 D. U 0 N A W N W fJi Q) N J N r O !] m O U W V m V-+ U (li O N N O (l� N U O W V Am W U 0 J W 0 A A N V A m O O A U U U U O) U O) J V V J OO CO M {p 0 0 O 3 pA W O W m 0 N U m O W W m N U 00 U N N V V W V V N V OD N m N O 0 0 W 0 N V U O A w W 0 m W N N U 0 QD N 0 W N o0000 00000 00000 0000 z M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m w f!i w w w w w w w w Ln w W w w w w w w pol p !.)(� G7 G7 G7 G7 G7 G7 L7 47 G7 G7 G7 G7 G7 G7 C.1 C.7 (� O o rn m m rn rn rn m rn rn rn rn m m rn m m rn rn m Z o � m D 0 v o' S m c 0 0 0 v o W 0 O W O co O �p 7 N ID ro S. O G N O 7 c = = W O O O W D 3 @ nP o N c .0) a.) E N N O (D ;v .Y` C1 C W W � 2 2 O O O n 0 3 0 0 2 �. 3 1 9 3 6 Baker Hughes g I Date: Abby Bell AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 January 16, 2020 rom: Letter of Transmittal Harvey Finch Baker Hughes 795 East 94th Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3H -01A 3H-01AL1PB1 3H-01AL1 JAN It' 2020 (3) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Harvey Finch Baker Hughes Wellplanner Harvey. Finch( c@bakerhughes.com v h CD _ CD CD Ma 0 owl co 77 rn T 1 CD cn z m E9 w � 0 0 0 V 0 _ n 0 0 O CA L71 CMLD & ¥ e \/ ■ ¥ ' * * g g @ n r>- - _ ' _ _ f \ —8. loo \ \ / t i z y 0 _ _ N 0 � O / z CD 0 ° } ` � � � 0 ; - / � 3 a •• � .. k \ m | ` } � A %f < < 2 » » j 3 'WO 0 0 » m » \ > / > j \ o \ CL ƒ } 10 \ \ ` j \ )f/ z %\E ) cn _ § } \ ƒ _ \ \ 7 2 ( 2>G &, ¥ = 8k\ 0 21 \/ i CL \ to ( ' C,W ) \ \ / & » z y \x a ` } > j 3 ( 10 \ g cn ( ¥ = U E I ; 11 .. ( - o Ch z # E g ] % o ; c / ID0 \ % n ƒ o \ { o 0 0 .. '' CD2 0) CD) =r co 0, 0 _am = — _ _0 \ 2 \ / .. CD ƒ U) a \}< _»a41 & } _ ° 0 ƒ ` , / ® i ID _ \ * > 5 k \ \ ` 4 2 2 $ \� \\ \ § { OD ~ OD 4 \ 21 T. CL \ to ( ' C,W ) \ \ / & » z y I O V v (O 00 W O) V V O mUN (0 -I m m m UNU m N (OP mCn WCn OO O O O 0 U OAm O O N m A m O W A O m O m m m m U (0 N N O U m m m m m m m m (o (0 (o (0 (0 (o (o (0 (o (o (0 3 m V U A A W A m N W A W U m m V U W W r n A W A m N W A m m A (D (D N A A W U m V N A N W W A A W A A A A A U U A W A U U -' A J O m W O W U m W U A W O U O A A U U U N V A O U N V N (il O V U N U cn cn U U U U U U U U N U U U U U U c �i (0 (p (0 (0 (D (D fp (0 (D (O (0 (O (0 (0 (0 (D (0 (O (O N G V m A m U N O O N A m m N U (O N A U N W U m m N m [O m U U (D O m N V m A N U J A m W (0 U N N O N m m m U U U U U U U U U U U U U U U U U U U c S m m m m m m m m m m m m m m m m m m m N (T� U A A A W W W W W W A A A A U U U U er UI O m U N (O m A A m m O N W U m m N m O m U U (0 O m N V m A N U V A m W (0 U N N O N m m m A A A A A A A A A A A 41 d A L A A A y Z O O N N N j W W A A A A U U O W U m A A Ui W N O (0 W W O U A W N O m V J A (0 AA U m A m A m m W O m W O W N O N O W m m A m V W A � V � U O O � V _ N m 0 0 0 0 0 Nm (W11 A W m A (OTI WN O J (NII W O V CUiI m m V O CO tD U m A U m m N � A W O O N U U UI U U U U U U U U U U U U U U N U Z 0 �s (0 CO m m A m N A m U U O N W V O W O N W O m m m m W N m m W m (0 m W A A A A A A A A A A A A A A A A A A A y m o> om m in U cn in U U v, U uW, � N N ipon d a �� T(O N O N U (UD A m tN0 A T (00 W N m N m A N U V m U N N U m W V � v ca A m W J j N m A V A W m J W O m G U m (0 O U (O O A J m (O m N cn v O W m (0 NU m U m A O N m m (0 m m m U N N � O O O O m W 0 d U W A A m N m N N m U A O U A U A m [0 N U O (0 cD m N W O A m m N m 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O Z Z O .� mww0 U)wcom0 w00mw 0)w - o G7 G7 � G'7 G7 L) G7 � G7 G7 O 0 G) 0 0 0 Z Z G) O U v U U U VI VI VI U U U U U VI N UI { { W Z _ _ d Z Z N C7 (� y V O O A A o o N O d � D N_ 3 co 00 A W m V p C T O N O p 3 N O O V -8 m m V V A W OD -- H --I co m N O O) O O U O O W 00 O O N N Cn N O w w 2 2 w = w S w y = c 0 0 0 0 0 2 O O Sn (D N N N N x (G O O O O O W i D (O (O (D 0 O n S N w Z D = 2 n O � w D D = O m D W r W W o O O Z O Z T Z G) n n 3 10 (D G� 0 0 0 Z Z Z Z n n 0 0 o O O K O v o N o U) G) z O O O 0ou O U) ! Cn E<- c) d d I C/) m r m r CLMCLM .D .0 c w v V V v O O N N N N t N y N N N N O v N O O O O O d'4 (0 (0 tD (D N y c N O 3 v m v w v 0 m 3 3 (O 0 N 7 O O d m 3 w w i 3' O O O - W y 3 @ @ b (A C O) T d o 0 O O_ C W W (3 S 2 O O O 0 (. n �. O CD 0 C/) 0 C: 0 < ( 3 �. O N N N N j co W W N i� Q. c O O Sn N N N N x (G O O O O O W i D (O (O (D = S N V n n o co o o ro co ro co 0 to to 0 W D 0 a <o Wom m m a 3 rn m r v V rn O) rn rn CT U A A A W (,J W (J N N O O O O w (D W m U N WD rn W O V A W U N tD rn W O J A U N (D rn W O U O O O O O O U O O O O O O O O U O N O O O U O O O O O N A O N U A0 N A U W N 8� U U U W rn J W 0) W U m J rn O O O m O O N O m W J N O O 0 � W J N O W U rn W N N O A rn w W W WD 0 * WD W (D w rn w W 0 W rn rn ( O O ( rn rn rn N rn m rn rn m m u5 V J (0 O pp O O W N (D O O O OD W O WD W 0) rn rn OD WD OD W W ...r N N WAO A O N U (CD W W W N rn N w -+ O O A rn V J rn U W O A N U W W J V W (D J W U rn rn rn U WAp W N N A A A U U U U U U O� m m lP J O) W O) mApD U U V N WCO V (O S N ON S J O N (NP O (m0 W W N O O A A U U U U U U U U U (Ji U S, U U U M U U U (T U C j WO O O O WD W W (O (O WO W cD (D (D W W O O WO WO N [O (D [D ([) (D tD (D WO O 2 N N O O N W W W W W W W W W N N W W A U A W O tD m rn V A U O tD J A W N IV A J W rn U O tD V O rn rn rn W 0 U m W rn U W W U J A A U W rn N rn N W A rn J U J N Q U A U W U rn J O O N WT U U WDA (h U U U U U U U 0 U (OJD� (W(�� (O(B�D (rn(D� N (W� (rn1� N (rnl� Urni VUi Vrni (rnT (rnl� (WP (rnl� (rn IrnJI Urni N (rn (Wli Urni (WT (rnit (O(�� Vrni Vrni (ml� (ml� (rnl� � N� T U A A U U rn J J J V J J J J J QJ v J dl (0 rn V U A W W N N A U O W J � A W N � N A J W rn U O O J O rn rn rn W Ou W CD U W (D U J A A U W rn N rn N tD A rn J U J N Q U A U [D U m J O O N WW WJ WV LUJ J J NW 0)J W WV 0) W J W J M J N(D UJ WW O �C Zft W A A A A U U m rn J M - WO WO 10 J O W A W O, f0 U W O N a 1 0 rnAW OM U w 1i v O U J rn U W A 6Wi WJ COn v U rn ONi O v N OAD cA0 O A N lD (rnIi WAD -N+ A t00 N ITl J J 6 6 6 6� & 6 � Wb � � bo 8o 6 6 6 ca 6 6 6 Wp io i� ro 6 6 io � o o � `2 M t0 O N W W U U J J w WD O N W S U J J - (O N J A W O J W W N Co . N (D J U N rn J N N O O O m 0) N O U V N pJ J J M O O OD W W QQ11 j A * U rn U N rn W WD (D rn A U W rn A 0) WD WO U J Wo A W A J N Cl) A rn O J tp W U O O rn m rn U U U U U U U wJ U U U U U U U U Ot rn(D i(DD mW Wrno iWo m io io io io iD Wo rn rn rn m (D io io io io io io WoWo Wo mrn rn SZ 0 0 G) 9)9) 0) 9) 9) M— m rn rn U U W W a W W N tJ O (UD ((n OJ OCD WAD O W W W A U m v OND A O W W A (Ulf V W O N W N O I N N U W JO A rn rn N J A V N J U rn N OD (D O J N U (D V W A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A y (D [0 O O t0 W O O N t0 W 0 0 10 0 W (D W W O O W WD WD 0 O 0 0 W - WD J J V J V V J J J J J J J V J J J J J V J J J J J J J J V V J pl W N rn rn W W OD N OD W �I WJp V V v V V J J J J {rn{pp rn rn Of 0) "' a 1 W N J rn m N O N (J ,WUD N W U J (D O ON A W A V (D N AW A N rn 8 � U O m m rn O U O N W A tD W N J N rn fD W U (D OD W O N 03 O J N A W J O A N rn A J rn U N O rn rn rn (D A W A U rn O rn W A A U N A W J N OJ rn N N rn N WD O rn N N P)O O N r O N (b A J J J J N rn O U O Wj CD O rn W pO A O W O rn N rn N W N W V U O rn rn U N CD CD v J J rn N A OD W WD Az. A U N o) O A co < (J w w w w w w y wy (J (J(mmJ w (J (J w w 0 w� (J w (J w w b b b A A v O W owi N N A Arn A v O W W Wrnm Ao cCn DJD m O N m WOo N fOJW m d= 0 J N N W N N N V N N N N N N N N V N O N N rn -+ -+ -+ -• ; W N O O m U W ON W N N W rn W O (UO tD rn A UOi O A W O OD N (WJE W CA O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O G) G) G7 G) G7 0 O O G) G) G) 0 G) 0 G) 0 0 G) O 0 O G) G) G) G) G) 0 G) 0 G) 0 o U N („J� [P v (P (T (T Z N N y O g y T n m m 0 3 O C p r j O a p o n CD m m C N O Wp ro (D S O a m K =� w w '- m o o r � W r 3 CP (P =o n C C W W 0 0 0 0 (D. n �. O (D 0 C O C < 3 �. -0 cn O LII M N O O O O O O O O O O o O O O O O O O O O O O o o O o w w w w w C� 'pr, N N N 8 O O O O c0 c0 OD OD m N N (D m W (O m W m A (O m N (0 m N O m A O m N N O m W (O m O O O O) O O (D (0 (O O O O N O <n O (3) w O O O O O O O N Ut A W W m (O W A N A N O (WO ,OpWD OV N A N 0)i m m W (U0 OND N J m I � m M O A N O O V V V W (JNi (AJ N N W N A W pm� A W J p m J W W o (D V m m m m W N Wm J W V1 W W A N (O O O N V W m t0 W m O m m N W m A A m O N W N m w N (O o _A A W W W W W W W U U• N � (n m (T Ut m m m m W N O N A �I O N m N N m N O OD (n N (D J N W O OJ O) J O) (n A W N m Z O m N A 8 O m m A m m W W N A A A U A N A J O) O A N N A U W N N J O (O m m W N W J w J O O m A W m m W w N N N O m 1 U m (n (n U7 (T U Ui mN m U N N mN m UN N fn (n (n N (n N m pm N o (T m Gi (C,ITi U N O O (Jn A m , 2 A N m N N A N (JO T W L mm mA n mJ N W O Ql N a co N m O m W (n A O o m A m N W W m A A A u, A N A V m m A N N N N J O (0 m m W N W J w J O O m A W m m W (O N N N O m N N N N N N N N N N N N N N N N N N N N N N N N N N W L W W W y Z N N N W W W A A A d j N m m m m V J J v m OD OD (O t0 (O O O O O N U m O A V O c m m N m O W O W m (0 N N m A V O m (0 N N m U U m W N O <O m V N m N m m (O N N m t0 A W W N O A N (0 mO A W A w A m w m m U w A W O (/� J N V W (p N A m m O W V m Ut m J m m W O N O A A O m W (D W V N A 10 A (O W m O N y m v J v v j 4 8 v J V v V v J m O O O O N N W A U N m J m m t0 W O N W V C (0 J A (D m N V W (0 m W m N J (O(�n W m (0 -� m m N W V W N m A Np m m O (m(p OD V A W W m W N N A N N OND A N v N A V V O N w (JO m m A U 4n (n N N U m Ut U m N N N U U N N m N m N m (A N N Un N N U N (P LZ 0 m m 0 0 0 0 0 0 0 0 0 m m 0 0 0 w 0 0 0 0 10 10 030 V J - W J mO 8 8 8 O OJT a?�m V m m U7 (O O N W m A m (O A O) U N V. m J J m (D O V OD � pp m V m m m A IJ N V V (n A m (O A V N w m m 0 mm U (O m W N N N V W J m N U7 O A O V V) m m N m W O m m A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A y m m m m m mm m V V V J v pJ� U W O N m t0 W 01N N N N A N W (n W _(w0 Q1 W N N m O N A Umi W C2 W N A N m A N W A w la U( A N m O m0 W _ � v N JV 07 W (D (0 m N A m (0 V m 01 m U O V m N m (D V IJ A m O 0 V m m W N (n W W O m V A W m O m W O W m W V W m U W m (n G N N N N N N N N m co(ANn N N N N N N N N N N r!a N (PN) Na o 833 a W W W W W W W W N N mm N m P)O D OJ m OVD OD N V a P A w A A W mW W N N W mJ V x m V j m m m m (n A � O m m O m m W J R J W m (n W m O (O m W � m A U W (O O m N V N J N A m (O N A W mu V A W A (O U m O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O cn w w 0 w N N N S (p U) N N N y N f�n (A lin 0 w w w w N N N p G) G7 G7 G7 i n n Cil G7 G7 G1 GI G, G) G) O d A N O N M n (D m D 'p r 3 g 2 2 2 c c o O O O N N O D D 2 2 s v T _ a C N D X Gl 7 10 C d 7C' m W 'y 3�iP nP 20 wC m rn 2 O O � C C � N N a c w w (3 2 2 O O O rn N O OD A 41V n m m 0 0 0 o p o N 3 N V V (D N O A m W CO W W V N m m 001 m � N (D O) V U GJ c0 W N OJ (p A O W N V U N W U N U• tT C N Q m co m e� � N (O W N OJ (0 N N N N N N N z o W xL, w N 0 N 0 V A W V 0 V V O) O c0 W O V ol W p O C N m cna N uv m m m N N u v U v z o o oo w a io a U3 V 8 A U3 V V A N m m m m m m m m x" 3 coo o o o o o` a W N m 0 O N O O O fn 0 N 00) V A m V7 < m cmD A A cAD W` � d O A A A (D 3 $ 3 3 3 3 N 20 0000 0,* * � M M cn Co W M 0 O O V(l(T N N z 11 0 3 m !n O S� to a n 3 _ = x c 0 0 a 0 3 0 d 2 0 0 cr m S m ''a m NM � A n m O 0 3 Ct CD 0 3 m CD 81 Z O a 0 m O c = = m — W D 3 @ o m rn O o O O a c w w n = _ O O O `fi Baker Hughes V Date: Abby Bell AOGCC 333 West 7th Ave, Suite 100 Anchorage, Alaska 99501 January 16, 2020 From: 2 19 158 3 193 4 Letter of Transmittal Harvey Finch Baker Hughes 795 East 94th Avenue Anchorage, Alaska 99515 Please find enclosed the directional survey data for the following well(s): 3H -01A 3H-01AL1PB1 3H-01AL1 ,JAN I ; `��� AOGC (3) Total prints Enclosed for each well(s): 1 hardcopy print of directional survey reports (NAD27) 1 compact disk containing electronic survey files Harvey Finch Baker Hughes Wellplanner Harvey. Finch@bakerhughes.com v h M" C CD (D X CD 00 0 *1 NO] CA O O W N O O O .P O Q wj £ ¥ » 2 Cl) - - ¥ > \ 4 { j \\ cn = a ° to \ B ' / \ e 5 \� 0 \ \ \ \ \ ƒ 7 » » O k2 / § © } ` .. �� \ n k / / - / / •• < < 0 / / L ( z \ \ 6 ) 0 0 0 ± / » z %f 0 < e 0 A \ \ \ \ _ ) \ 0 2 ! % % $ _ ~ \ \ » C / v ( - < ©f5 / 9 / 9 \ M0 — ° / ) \ ® m ( 2 ® { ( ( 2' \ < g \ \ ff o G 2 »* / g \ % 8© ( £ ¥ » 2 ¥ 0 ¥ ¥ J ƒ ƒ ` ( I cn = a ° R\ t7 ' / e 5 3 CD 0 : \ 0 Co � O k2 © } ` .. �� co ( U ; - / R3 •• . k ] %f .. A 4 < » C / % - < ©f5 / 9 / 9 \ M0 — ° / ) ( ® m ( 2 ® { ( ( 2' < g k 6 ) ff »* g % 8© ( f } \ co(D\ \ ( ^ 0 CD I \ o ; 0 ± -4 / ' \\ 10 \ \( { cn /m>1 0y ) CD c \ \ { k 2 ( ` f z/ 0 & _ § 3 CL .. _ / rn ( c z - o 0 z @ Q ($ Co 9 g2aM 'o _ � \ CD k 0 m§ 0 o ') ('D k / 0 .. 0 « ( 2 0 ƒ � _ =_< M- \ _ 0 _ sm — D CD . 0 2 (\yCDa ; - 2 w w ((Dm S 7 { { 7 § ( \ \ o { 3 , z \ \ \ 0 \ \ \ o CL CL G_7 21 N) \ \ \ \ O\l N N A A v C) O n 0 0 0 a c a OD cn T m m m m m m m m W m co m m 91 m m m m 91 m V O 0 t0 tD 0 m m W V V V N O O m W V V V W J W W Ol m U m U mm N m m (Wn (OJt m O W O N U U N V U V N N U O O 0 U U O N U U m m V m V 0 m W A W V W m A U J N U O O N Jm 0 (m0 NO �W mVOi p�UOt mm Ov 0U0NA NW pN 0m Omm ON (Alt J,(WO �m T A 0 ( N 0 N 0 m .tWO v _ N W A N A U � U m J W O t t V V V V V8 m „4 IV. O O N A 0 N U V N A A U m m 0 O O (O tD O N !\)P) A A A A m A m W a m U IJ U W A m tJ A A 0 m A a m O O O O O m V J O N W 0 U N O w W A 0 m J O m U 0 m W O O O O O W W W W W W W W W AA A (Olt (.Olt VOt 001 m m fJ0 (JO m m m V m m W O W U U U A A A U V O A V . m N m 0 N U m O m N U U U 0 N m U m N O m m O A W A 0 m U m U O U N 0 m A N N U W A N O N m pU U U U U U C tUp .tUO tU0 m m m (UO (JJt (JO N m O W m W N A N U O O M m m tN0 x Cl) 0 N m U m N O m m O A W A 0 U U m U O U N 0 m A N N A m Cl m m V O O WW A A A A U U U m m m m m m J m m m m 01 m U U U U A A A A x W J O m 0 A V O W U V 0, 0 U O O O 0 0 V m N U A 0 W m O) O U V V 0 O U U V m W m (O 0 A N W IJ U tJ m U j W W A 0 jD m U m A m m m m O m _ _ 0—Nt �p-1 — �— fJ fJ IV fmJ � W W A A A A A A A mAm A A A A y O W v N AOO W A (Jit m m V m U N A O N N W (JD W 01 m O t1 m O m V IJ m m A V TA N V O W O U W U U m � IV w 0 w j 0 A 0 A W V 0 N W O 0 O V N A A U -� O m A U W m m U U U U U U U Vt U U (lt (T Vt Ut Ut N U U U U U U U U U (n U U U U Ut z 0 0 0 0 0 0 (O tO (O t0 t0 (0 (D 0 rD 0 0 0 0 0 0 0 0 0 t0 0 0 (0 0 0.50 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04, n U N U U U U U N U (Jt U U U Vt U U U U U U U U U U U U U U U O tOD (JO O N N W U m W 9 W1 N W (OO N O N taD O (Olt W W N O (W)t OUt A N O 0 O m O V m W V m O W m O 0 N W A W O U m N N A 0 W W A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N J J V V V V V J J V J V V V fVJ V V V N O (J� V V V V V V V V V V V x� p1 N N -U+ O (a0 ta0 V d N tW0 Ol W m A tN0 W N 0+ tJlt m m (mJ N W A W N J N U m O 0 U O1 W �I CD O O V m O U O m W O m O N S O U V j m A m N � � m U 0 m 0 O 0 N V N J U O W m W N m N 0 0 O a m m W N U O A m A W W W W W W A P) m 100 V m m A ONi O 0 N V m m V U U m V O V m m J A m Wm p � CCA U N 00 m m O N O A A A N N W W W N (OD A N m W W � CD W j m m N (mJt DUD N a N I x j 01 N J 0 W m 0 m U O A m J O O m O 0 m m V .m U A m A V <D m S�S S�S 5�5 g�g S3S g�g S�g gg�g g�g g�g 3 S�g 5�5 5�5 S�S m Ul O O O O O O O O O O O O O O O O O O 0 0 0 0 0 O OZ Z Z Z CD [) •CD e n n n n< 0, W Ul N m m W m N m m N Vi w m (n m m m w N m W (n I I Iin p G7 O O O O (� O O (� (7 O G1 G7 G7 G7 n O O O O O G7 O G7 G7 O O O O O O z Z Z Z Z A v v v v O O O O N N N N cn r_ (D A W 'Q 0 O OU2 ry G 3 O N m � K W D 3 o m n rn rn n G O O O O O O N C W W � 2 2 O O O z O O :r S x so 0(1 R N 99 A a 3 tD tD (D (0 (D tD (0 (O m cD N t0 <O CD UD 0 u7 m m m m OD m W W m m OD W m N C 3 U pUp A WA(,� A W W W N rNr�1� N —— O O O U) W W imp m W O V V V O M T 0 U A m m mV O� V m m m V V V V m m x O m m m W m m Ut J W (O m m W V W O 0 A W N m A W J w !D O A (D A m A U O m W W w A U W J N (0 J m J W (D O (0 w W N W W t 0 m m m m m m m m m m m m m m m m 0 <O (O (0 N (D m m w m m (0 (p p 7 O c0 (O tD V V m W (I (W(�T M V J J mVm V (O N N N O O O O (D (O l0 O N .r C) m O J N m N m N A O � W V O m (m!( (ND W v U O W m 0 0 V m v V U W O j AO O) O O A m N N m O V Umi N V O N W W W N (ND( W N tV0 U N U U (J( U (D( U U U U U U U U U U U U U Vt U m U U 4( m U U 4( (l( C0 O O W W W W W N W W W W W O W W O N W W W O O W W O W O A A A A A W W W W W W W � W N N N N W W W .W. W , , W N W W W W N O (0 (D OD J U W N O (0 m m W O O N m W W O m J W m W m U W O W J m t0 m J J m O W O V V m W (D UJ V V V W O A m m m 0) �' m rn rn &n w v w U Nn m y m J V V V m W W N (D J m W W O m V W m W N U W O W V (O (D m J J m m m O J J wAj b s 6 6 6 &, w s 6 w w w w b A.U ..vJ N..0 N M m N m m OD O O O � U aN Ws y Z m A V O O N U W N O m m U m U A N O (p m J N U A m m V V V V V m V m A A m U U N N m O O W W W O m N A A N W W W m cD J U N A m O (D m A (D m m J A m (0 O N � V (0 (D V O W (D V t N W N ( I m m O O -a N N W A OU m m m m O O ' -+ N N N W m O m O (O V U W N O V U N 0 V U N O m m W N O 01 N OD IJ OD c0 O (D W N A IV m m m O A m O m m A m A A W A (0 0 m 0 O U O A m V [0 (0 m m U W O U m A O A W V (0 (D U O O m m U m O A m W U O U U U U Vt (P N U U N U U U U U U U U U U U U m U U (1( m U U Uf U Z m _`8i _`8i m m rn rn m m m m 9)) rn .(�i m N U N _ctOi, a m m mm U U A A A W W W N N N j Z,� O O O O m m (0 m m m m J U N m U N t0 L4 A OD U N (0 m W m U N 0 m W m U N (O m W O (D O m U J m tD W W (PCD O) CD (O N A m U m N W W W A A A A A W V OOpp m m J O O 4N IV N T A o N N w m m W m m O m m O N � m U m (D A N m v m ID W m A W V W O W (D V V m m m U N V fD A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A y V V V pV V V V J J (J�D J J J V J pV V tJpp J m m A (mT mJ (JD N A V IwD N ONi t0 N A WL W C� m N m .0N1 A A V a N N A N (ml( m (OD A O W J W W (D V m O A D U A mJ m 2 mJ O A J A m A m m U N (O O A A O W U N m O W W U O O N U U V) W m V m m N s r A J m A A m m m J O O U f0 U O A [O W U A m V N A m W V W C w U O U w W O w m m m m j U m O (Jn A 0 J O U (0 N m V N Cly w t0 N A V O W . (D N U �+ N W m O O O O m O O O O c0 O O � O cD m O U U U U U A W N = d N N m O O J O U m U O m O W 0 W V N m O N O A m A cp N O N O O (D A m W m (D O N m V N W W V V V V (0 W A m V m d il d o G o o d d d d o o a d d d 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 U) w w w w w w w w w w w w w w w w w w w w w w w w w w w w 0 Gl n e 57 ? 57 57 Gl G7 G7 G7 47 (") 47 4i G'7 G'I 47 Gl n G7 L7 O d N C/) 0 m v n N m m o, 3 K D a c 3< e d 0 m 0 cD d N O j m oa C CD N n) 7 N M (D 0 O Ll � o x x CD O O = co D 3 @ Cts b v n rn rn Z o 0 N O O a C W W � 2 2 o O o n 0 0 n 8T :r N u o n 0 m 0 c 0 C 0 Yf rn N N O 41A L ff�1 (D U o O o 0 o O O O O o O O O O O O O oo O O w 0 tD m m mmW m v J j m m m N U O m A N N � W T �2 N W W N U 0 A A d IJ IJ m V 0 N W IJ m A W O m U m m J W O U V U A J O m U V A (D m m W J W 10 A J A W w co w m (o (o (o 0 c m m m m m m mm m m m m m m m m w m m m co 0 —, 5 N W W W N (p m V m m m m J m m m m m ((,J) V V m m V 0 N .... n (0 W W m J O m W W O m m m cD (0 m t0 m m m V m U N N N N O m c0 W A m (0 � A W d (N11 d `� —• W W W W m (W11 N d (A)t J O N A v O m 0 -V+ J O O V V � � m m m V Con U0t (0n (mi( rn m m m m T 001 W U (0n (0n (Ol( (mP A A A A A A A A A i V m m V m O N W U rn m U A W N O O m m U W (0 J m A N O O N m U O U W O U N m (0 V J m O N N (0 A (0 (0 O m U W N W A U U U U U U U U (P (T U (JI U U V+ U U U U U U U U U U U U U V1 U U C G m m m m m mm m m m mp i mp m m m m p mp m mm m m m m m m m m m m m m m m m m �' O O O N A m OJ m m m m W m U N O <0 J U1 W O m U A m x U1 O m J (0 W N A O O U A W U J m m m O O W N U N m c0 W U m J N N N N N N N6 N N N N N N N N W W W W W W W W W W W W W W L y 2 U m m m m L V V V m m m (0 (0 (0 t0 O O O O N N IJ W W W A y O N U m W m m A V O W m cD O A 01 t0 N Ut m A W 0m ON1 W O m y O m 97 W N O m V a) W N O (0 O (0 m m A m V N V N U 0 W O V N N rn V O V 0 U 0 O m A m V U m O (D A m A V V m U U U m U O (0 m O O N O N W J O m W W W lYz, N mm O y N W W A N 6V1 V W (JO O O 8m N w N OED (D O x C U m U U W A O O O <0 m m W (0 m O rn m N m A A Vt m cD W U (0 O V m 0 m N A N U (0 A m V W U O O m U h1 (0 CJ j j lD U U U U U U U V1 U 01 V1 U U U U U U U U U U U U U Ut U �Up U (li U U � 0 'a (D (0 (D (0 (0 (0 (0 (0 (D t0 (0 (0 c0 (0 (0 c0 (0 (D (D c0 (D c0 ,1 y U 0 A A A W W W W N N N N O O O W (0 (0 m m m m J V J J v W 8 m U N m J U N (0 0)W O V U N O J j N m U N o m W m U W O (a (0 O N A (D J m O N W U o,J m O O N m U m J w N A J U j 0 m A W U m U V A m (!p m 8 W � A m N m N 8 W V m A m m N O V W m (D m J m (0 O O m m N m m V (p V W W (0 O O N A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A y c0 (0 (D t0 (0 (D (0 (0 (D l0 c0 (0 (0 (O (0 (0 t0 (0 (0 (0 (0 (D (0 (0 (0 (0 - m V V V V V J V V J J J V J V V V V V V V V V V - V - V V V - V - V V� O [D (D w m (D (D 10 0 10 w 0 m m m m m m m m m m m m m m V V V V V -- � a S m m (Jn o w `S1 A v, 8 m tO Mm m a Sol w@ N m� 0 0 50o m R w m m O (0 m (O N W t0 O W J U V rn A O U W N A m m (0 W A J O U U N (0 o O cL> O A N O N N U U U W U J O A U m W m J W U V (0 A m V A V 8 r w < N N N N N N N N N N �N(pp N W W W W W W W W (6(� W W W 6(� W W W W W W" U m d (3, O N m m A v O ON C, W O A V (D N (NT m A V O W m LA0 N x @ O O V O O O O O O O O (0 t0 t0 (0 O O (0 t0 m m m m m m m V m A = d W W t0 (0 W m m U A W A A 10 A m N 8 O A U U m 0 m � 8 A — m A m U O W m W O A U V U O A m V 10 O A m w U m U (O V (O m V N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O w w w w w w wW wW W wWW W W w w w w w w w '9 5? 8 d 3 m W a** N v 0 H m @ 8. 3 3 O a da m o o 3 � W D 3 @ @ o a c rn O O N O O G c N C W W � 2 2 O O O n 0 z 0 0 S Ln �f = x x c c o O O O p N O D D s x � S � � N a c y Ol 0 'O C d x m o o 3 � W D 3 @ @ o a c rn O O N O O G c N C W W � 2 2 O O O n 0 z 0 0 S Ln �f W N N O A O V W W m N O N - m c00 O O W O (mn 0 tD N O O O o O o o O O O O O O O O C 3 0 w w w V V V V m m O 0 N U1 A N N A A m O W A m J m m N A J cO 0 O O (O OD O (0 w OD WVw w m V m OD p0�) W A A 01 W 0 O .... O N W N (AD m W w W V w W (NO N r m (VJ 0 w W OW wJ N W N N N N N N N 0 N r: (0 V V V w m m 6) pp W m J (O W N W m 0) m A O O m V W N Vmi CW)1 A W (AD N O W J J A m V (OJ O � W A UOi m M 0 10 m i0 iD (o (c) 'D m w w w N w w w w w w w w w WW V V V V V P) m O J J J J m m m m W W O (D m m A N 0 O W W O m m v (O m m N m O J m O N w O w O O N OD OD m 0 W m O V m A J N W N w N N A J O O A O w N N m W O W V W N w N 0 0 (O t0 t0 t0 t0 tD c0 W (O(O 0 0 0 0 0 ID w w w N W w 00 CU CV (� cn O O O O O O O 0 0 0 m m w V1 tD m m N m O V m O w O w O O N 0 0 m w m w m A V m W N w N N A V O 0 O A O w W m m w J W N N w m N N N N N N N N N N N N N N N N N N N y Z m w N N w A J A V W t0 N N J (J W O) (O O W A x V1 W N N wO N W Nw N W O w O) W O W J W V A W . _ O (T A w O o w o w A I � OD W W J A O m � A N OD N V OJ W J N A N W O V W W N 0) N A N O OD 6l N N N A c m b b b b A b 1 b b b b b n n n n n n In b !n C O O N N N W W m m J m (0 O W A m V w O N W c W Op A w m w N V W cD O m m 0) m 0 N AAAA N A m W N O N 0 m N V V W w w W w O W w O m m O O V N w O m 0 W N m O W w O A O O J N W 0 m 0 W W A N m m N (n V+ (n N m N (n (n (n N m m m N m m m CM1 N m z m m m m m m m m m m 9DOJO v (JO (VO :-4 (JD (JO (VD (JO (VO (JO fV0 (VO (JO (JO S a J N m V m m J m 000 W N A N m m w O N A J O J W v m m m (Q (D A m W w A m W m IJ pp w m O N A 0 m m m WW IV m W W A J (D J 0 O A (D t0 V m N w N W W V 0 0 m W V m m A A A A A A A A A A A A A A A A A A A A A A A A A A A ymj 0 0 0 OO 0 0 (O O 0 0 0 w w w w w w CO w w w w w w w w M w m w w w w w w w w w w N N N N N N N N j N N (p pp � 8 : WW � : O O O O O O O m A m W m W V :t,(.OM1 A m .OJO m A N O m O OmD OAD O O (O w O w m A O w A W V N tD N J O J IJ t0 A W O O W m _ � O O A N W A N A w m w m V m w m A m w m A A W A m V A r O m w m m m m 0 A A O W W w m O m w w V (D 0 A W tD Ca O V m 0 w V m N W N N N O 0 m m O V V w W m W 0 m W N N N N N N N N N N N N N N N N N N N N n CD �1 w w w 0 tD tD O O O -� N N W 4J m W A A A m m m m rR (D W m 0 N m w N m (O j 0) w V W (p N O) w W m 10 0 V A J w V V V O m N W m W m m N Ut A A m m N O w w Vw 0 g IJ w W w W O A 01 N m m O m V V V 0 m N V tO W m m N 0 0 m A W W A M 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 mm� � C U C o � � i � c� c� i c c> � c oCDw w w w w w w w w w w w w w w w w w w w w w w is w z � 3 0 O O n CO CO cn O O O A W G Q OD U1 Z u, o cn m 0 d N sn 0 3 (D .O D 3 @ @ o u n m rn y c 0) O O G (Gn w c w w (? x x O O O 7 0 0 0 rl0 0 =. n D. 0 0 Cl) 0 (D =r -0 (1)' 0 m 0 2 to V THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY James Ohlinger CTD Team Lead ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Kuparuk River Field, Kuparuk Oil Pool, KRU 31-1-01AL1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 219-159 Surface Location: 1546' FNL, 281' FWL, SEC. 12, T12N, R8E, UM Bottomhole Location: 2988' FNL, 5279' FEL, SEC. 12, TI 2N, R8E, UM Dear Mr. Ohlinger: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.olaska.gov Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 219-158, API No. 50-103-20084- 01-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, WJ M Price Chair DATED thiswday of November, 2019. I STATE OF ALASKA 1 ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 RECEIVED NOV 12 2019 1a. Type of Work: • 1b. Proposed Well Class: Exploratory -Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c.ii i I s sed for: Drill ❑ Lateral Q Stratigraphic Test F-1Development- Oil 2Service - Winj ❑ Single Zone 0 • Co 19 bac 1 ydrates ❑ Redrill ❑ Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket ❑✓ Single Well ❑ 11. Well Name and Number: ConocoPhillips Alaska Inc Bond No.s + a0882627 0 3H-01AL1 3. Address: 6. Proposed Depth: %(. i3 1 12. Field/Pool(s): P.O. Box 100360 Anchorage, AK 99510-0360 MD: 11,600' TVD. 5,890' Kuparuk River Field / Kuparuk Oil Pool 4a. Location of Well (Governmental Section): 7. Pr perty Designation: �g Surface: 1,546' FNL, 281' PEL SEC 12, T 12N, R 8E, UM D4 PJ 1525547,. L-0025531 Top of Productive Horizon: /: A/ L_ /AID [r, /13• If 8. DNR Approval Number: 13. Approximate Spud Date: 744' FNL, 923' FEL, SEC 14, T 12N, R 8E, UM 931886000, 931882000 11/23/2019 Total Depth: ;�I I' Z•t `0 9. Acres in Property: 14. Distance to Nearest Property: 2988' FNL, ,5279' FEL, SEC 12, T 12N, R 8E, UM 2560 4,355- 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 76' 15. Distance to Nearest Well Open Surface: x- L9001 -TT ax,)// Zone- 4 GL / BF Elevation above MSL (ft): 39' to Same Pool: 75' (3H -26L1) 16. Deviated wells: Kickoff depth: 8,400' feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) / Aazi um Hole Angle: , 4e degrees Downhole: 3,526 • Surface: 2,947 18. Casing Program: Specifications Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade Coupling Length MD TVD MD TVD (including stage data) 3" 2-3/8" 4.7# L-80 ST -L 4,044' 7,556 5,682' 11,600' 5,872' Slotted Liner 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): 11 &d0 �,2ZS 5,872' NA 8,400' 5-852' NA Casing Il Length Size Cement Volume s�MD TVD Conductor/Structural 80' 16 245 sx ASI 121 121 Surface 3,601' 9.625 1300 sx AS III Lead, 400 sx Class G 3,636' 2,951' Intermediate Tail Production 8,143' 7 300 sx Class G 8,177' 6,168' Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): 7,684'-7,752' - 7,822'-7,843' 5,855'-5,907' - 5,960'-5,974' Hydraulic Fracture planned? Yes[ -1 No ❑� , 20. Attachments: Property Plat ❑ BOP Sketch Drilling Program e Time v. Depth Plot B Shallow Hazard Analysis 8 Diverter Sketch Seabed Report Drilling Fluid Program 20 AAC 25.050 requirementse 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact NaweJames Hayes Authorized Name: James Ohlinger Contact Email: %ames.c.ha eS co .Com Authorized Title: CTD Le Contact Phone: 907-265-6972 Authorized Signature: Date: j Commission Use Onl Permit to Drill API Number: / Zy—�C/D Permit Approval See cover letter for other Number: —/� 50-/6) "� —/GL' >e.t = Date: ZZ I requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, s hydrates, or gas contained in shales: Other:%69' ��% 7 7� �f 4�aR Samples req'd: Yes Mudlogreq'd:Yes❑ No[ i/ U/,No[2r ,s7M 2' ) H2S measures: Yes o❑Directional svy req'd: Yes [g/No❑ Spacing exc ptio req'd: Yes [:INoL1c Inclination -only svy req'd: Yes E] No[? S•����� c`/�©/II(J Post initial injection MIT req'd: Yes El No[— APPROVED BY t, Approved by: COMMISSIONER THE COMMISSION Date: Form 10-401 Revised 12017 This permit is valid fg�24,�p�h�o� MAt t& opro�l per 0���5,0�(g) Q.�J1 KK ��l' Submit Form and Attachments in Duplicate sConocoPhillip Alaska P.O. BOX 100360 ANCHORAGE, ALASKA 99510-0360 November 8, 2019 Commissioner - State of Alaska Alaska Oil & Gas Conservation Commission 333 West 7th Avenue Suite 100 Anchorage, Alaska 99501 Dear Commissioner: ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill two laterals out of the KRU 3H-01 (PTD# 187-110) using the coiled tubing drilling rig, Nabors CDR3-AC. CTD operations are scheduled to begin the middle of November 2019. The objective will be to drill two laterals KRU 3H -01A and 3H-01AL1 targeting the , uparuk A -sand interval. To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20 AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of /�, •��'� being limited to 500' from the original point. Attached to this application are the following documents: — Permit to Drill Application Forms (10-401) for 3H -01A and 3H-01AL1 — Detailed Summary of Operations — Directional Plans for 1 F -071L1 and 1 F-071_1-01 — Current wellbore schematic — Proposed CTD schematic If you have any questions or require additional information, please contact me at 907-265-6927. Sincerely, James Hayes Coiled Tubing Drilling Engineer ConocoPhillips Alaska Kuparuk CTD Laterals 31-1-01A & 31-1-01AL1 Application for Permit to Drill Document% ��l NABORS ALASKA y 1. Well Name and Classification...........................................................................................................2 (Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b))......................................................................................................................2 2. Location Summary.............................................................................................................................2 (Requirements of 20 AAC 25.005(c)(2))......................................................................................................................................................2 3. Blowout Prevention Equipment Information...................................................................................2 (Requirements of 20 AAC 25.005(c)(3)).....................................................................................................................................................2 4. Drilling Hazards Information and Reservoir Pressure....................................................................2 (Requirements of 20 AAC 25.005(c)(4)).....................................................................................................................................................2 5. Procedure for Conducting Formation Integrity tests.....................................................................2 (Requirements of 20 AAC 25.005(c)(5))......................................................................................................................................................2 6. Casing and Cementing Program......................................................................................................3 (Requirements of 20 AAC 25.005(c)(6))......................................................................................................................................................3 7. Diverter System Information.............................................................................................................3 (Requirements of 20 AAC 25.005(c)(7))......................................................................................................................................................3 8. Drilling Fluids Program.....................................................................................................................3 (Requirements of 20 AAC 25.005(c)(8))......................................................................................................................................................3 9. Abnormally Pressured Formation Information...............................................................................4 (Requirements of 20 AAC 25.005(c)(9))......................................................................................................................................................4 10. Seismic Analysis................................................................................................................................4 (Requirements of 20 AAC 25.005(c)(10))....................................................................................................................................................4 11. Seabed Condition Analysis...............................................................................................................4 (Requirements of 20 AAC 25.005(c)(11))....................................................................................................................................................4 12. Evidence of Bonding.........................................................................................................................4 (Requirements of 20 AAC 25.005(c)(12))....................................................................................................................................................4 13. Proposed Drilling Program...............................................................................................................4 (Requirements of 20 AAC 25.005(c)(13))....................................................................................................................................................4 Summaryof Operations.................................................................................................................................................. 4 LinerRunning.................................................................................................................................................................. 6 14. Disposal of Drilling Mud and Cuttings.............................................................................................6 (Requirements of 20 AAC 25.005(c)(14))....................................................................................................................................................6 15. Directional Plans for Intentionally Deviated Wells..........................................................................6 (Requirements of 20 AAC 25.050(b)). . .................. ............................................................................... ...... ....................................... 6 16. Attachments.......................................................................................................................................6 Attachment 1: Directional Plans for 3H -01A & 3H-01AL1 laterals.................................................................................. 6 Attachment 2: Current Well Schematic for 31-1-01........................................................................................................... 6 Attachment 3: Proposed Well Schematic for 3H -01A & 3H-01 AL1 laterals.................................................................... 6 Pagel of 6 August 1, 2017 PTD Application: 3H -01A & 3H-01 AL1 1. Well Name and Classification (Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)) The proposed laterals described in this document are 3H -01A & 3H-01AL1. All laterals will be classified as "Development -Oil" wells. 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface and subsurface coordinates of the 31-1-01A & 31-1-01AL1. 3. Blowout Prevention Equipment Information (Requirements of 20 AAC 25.005 (c)(3)) Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC. BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations. — Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 3,500 psi. Using the maximum formation pressure in the area of 3,526 psi in 31-1-26 (i.e. 11.72 ppg EMW). The maximum potential surface pressure in 31-1-26, assuming a gas gradient of 0.1 psi/ft, would be 2,955 psi. See the "Drilling Hazards Information and Reservoir Pressure" section for more details. — The annular preventer will be tested to 250 psi and 2,500 psi. 4. Drilling Hazards Information and Reservoir Pressure (Requirements of 20 AAC 25.005 (c)(4)) Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a)) The formation pressure in KRU 3H-01 was measured to be 2,671 psi (8.77 ppg EMW) on 08/7/2019. The maximum downhole pressure in the 31-1-01 vicinity is to the northwest in the 31-1-26 producer at 3,526 psi (11.72 ppg EMW) from 08/2017. Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) The offset injectors we last on MI injection five years ago so there is a low risk of drilling into high pressure injected gas. Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) The major expected risk of hole problems in the 31-1-01A laterals will be shale instability across faults. Managed pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings. 5. Procedure for Conducting Formation Integrity tests (Requirements of 20 AAC 25.005(c)(5)) The 31-1-01A laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity test is not required. Page 2 of 6 August 3, 2017 PTD Application: 3H -01A & 3H-01AL1 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) New Completion Details Lateral Name Liner Top Liner Btm Liner Top Liner Btm Liner Details MD MD TVDSS TVDSS 3H -01A 8,400' 11,600' 5,862' 5,872` 2-3/8", 4.7#, L-80, ST -L slotted liner; aluminum billet on to 3H-01AL1 7,556' 11,600' 5,682' 5,890' 2-3/8", 4.7#, L-80, ST -L slotted liner; LTP 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a diverter system is not required. 8. Drilling Fluids Program (Requirements of 20 AAC 25.005(c)(8)) Diagram of Drilling System A diagram of the Nabors CDR3-AC mud system is on file with the Commission. Description of Drilling Fluid System — Window milling operations: Chloride -based FloVis mud (8.6 ppg) — Drilling operations: Chloride -based FloVis mud (8.6 ppg). This mud weight will not hydrostatically overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices described below. — Completion operations: The well will be loaded with 11.8 ppg NaBr completion fluid in order to provide formation over -balance and well bore stability while running completions. Managed Pressure Drilling Practice Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3 "Blowout Prevention Equipment Information". In the 3H -01A laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates or change in depth of circulation will be offset with back pressure adjustments. Page 3 of 6 August 3, 2017 PTD Application: 3H -01A & 31-1-01AL1 Pressure at the 31-1-01A Window (7,785' MD and 5,932' TVD) Using MPD MPD Pressure Table Pumps On F Pumps Off A Formation Pressure 2,671 psi 8.77 B Target BHP at Window 3,640 psi 11.80 C Mud Hydrostatic 2,653 psi 8.60 D Annular Friction (ECD) 607 psi 0 psi 0.078psi/ft C+D Mud + ECD Combined (no choke pressure) 3,260 psi 2,653 psi A-(C+D) Overbalanced / Underbalanced 589 psi -18 psi B-(C+D) Choke Pressure Required to Maintain 380 psi 987 psi Target BHP at window and deeper 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005(c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005(c)(11)) N/A - Application is for a land based well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005(c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005(c)(13)) Summary of Operations Background Well KRU 3H-01 is a Kuparuk A and C sand producer equipped with 3-1/2" tubing and 7" production casing. The CTD sidetrack will utilize two laterals to target the A sand to the northeast of 3H-01. The laterals will increase resource recovery and add new resources. Prior to CTD operations, E -line will punch 2' of holes in the 3-1/2" tubing tail below the packer at 7,566' MD and the D nipple at 7,485' MD will be milled out to a 2.80" ID. The existing A and C sand perforations will be squeezed with cement and the 3-1/2" tubing tail will be cemented in place to provide a means to kick out of the 7" casing. Following the cement squeeze, Nabors CDR3 will drill a cement pilot hole to 7,815' MD and set a mechanical whipstock in the 2.80" pilot hole at the planned kick off point of 7,785" MD. Page 4 of 6 August 3, 2017 PTD Application: 3H -01A & 3H-01AL1 The 3H -01A I4tefal will exit through the 7" at 7,785' MD and TD at 11,600' MD, targeting the A sand to the northeast. It will be completed with 2-3/8" slotted liner from TD up to 8,400' MD with an aluminum billet for kicking off the 3H-OIALI lateral. The 3H-01 AL 1 lateral will drill to a TD of 11,600' MD targeting the A sand. It will be completed with 2- 3/8" slotted liner from TD up inside 3-1/2" tubing tail to 7,756' MD with a deployment sleeve. Pre -CTD Work 1. Slickline (Fullbore assist): a. SBHP b. Injectivity Test 2. Coil: a. Perf tubing tail b. Lay in Cement Plug (7" casing up to tubing tail) c. Tag TOC d. Pressure Test Cement Squeeze and Negative Test e. Mill D nipple and tag TD for depth control Rig Work MIRU Nabors Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPS, test. r:1 I / > I, f 3;' 3 H-0 I A L4tetal (A sand) a. Drill 2.80" pilot hole through cement to 7,815' MD b. Caliper pilot hole c. Set top of whipstock at 7,785' MD and mill 2.80" window d. Drill 3" bi-center lateral to TD of 11,600' MD. e. Run 2%" slotted liner with an aluminum billet from TD up to 8,400' MD. 4. 3 H -O T A L I Lateral (A sand) a. Kick off the aluminum billet at 8,400' MD. b. Drill 3" bi-center lateral to TD of 11,400' MD. c. Run 2%" slotted liner with deployment sleeve from TD up into 3-1/2" production tubing to 7,556' MD. 5. Freeze protect, ND BOPE, and RDMO Nabors CDR3- AC rig. Post-Ri2 Work 1. Obtain SBHP. 2. Install gas lift design. 3. Return to production. Pressure Deployment of BHA The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two barriers to reservoir pressure, both internal and external to the BHA, during the deployment process. During BHA deployment, the following steps are observed. — Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is installed on the BOP riser with the BHA inside the lubricator. Page 5 of 6 August 3, 2017 PTD Application: 31-1-01A & 3H-01AL1 — Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and the BHA is lowered in place via slickline. — When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from moving when differential pressure is applied. The lubricator is removed once pressure is bled off above the deployment rams. — The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized, and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole. During BHA undeployment, the steps listed above are observed, only in reverse. Liner Running — The 3H -01A laterals will be displaced to an overbalancing fluid (11.8 ppg NaBr) prior to running liner. See "Drilling Fluids" section for more details. — While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will provide secondary well control while running 2-3/8" liner. 14. Disposal of Drilling Mud and Cuttings (Requirements of 20 AAC 25.005(c)(14)) • No annular injection on this well. • All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal. • Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18 or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable. • All wastes and waste fluids hauled from the pad must be properly documented and manifested. • Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200). 15. Directional Plans for Intentionally Deviated Wells (Requirements of 20 AAC 25.050(b)) — The Applicant is the only affected owner. — Please see Attachment 1: Directional Plans — Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run. — MWD directional, resistivity, and gamma ray will be run over the entire open hole section. — Distance to Nearest Property Line (measured to KPA boundary at closest point) Lateral Name Distance 3H -01A 4,075' 3H-01 AL1 4,355' — Distance to Nearest Well within Pool Lateral Name Distance Well 3H -01A 40' 31-1-261-1 3H-01AL1 75' 31-1-261-1 16. Attachments Attachment 1: Directional Plans for 314-01A & 3H-01AL 1 laterals Attachment 2: Current Well Schematic for 3H-01 Attachment 3: Proposed Well Schematic for 3H -01A & 3H-0IAL 1 laterals Page 6 of 6 August 3, 2017 ConocoPhilli s p ConocoPhillips Alaska Inc—Kuparuk Kuparuk River Unit Kuparuk 3H Pad 3H-01 3H-01AL1 Plan: 31-1-01AL1_wp01 Standard Planning Report 17 October, 2019 ConocoPhillips Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc—Kuparuk Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 31-1-01 Wellbore: 31-1-01AL1 Design: 3H-01 AL1_wp01 ConocoPhillips Planning Repoli Local Co-ordinate Reference: Well 31-1-01 TVD Reference: Mean Sea Level MD Reference: 31-1-01 @ 76.00usft (31-1-01) North Reference: True Survey Calculation Method: Minimum Curvature Project Kuparuk River Unit, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Design Audit Notes: Version: Vertical Section: 3H-01AL1_wp01 Phase: PLAN Tie On Depth: 8,400.00 Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 0.00 0.00 0.00 20.00 1011712019 9:00:45AM Page 2 COMPASS 5000.14 Build 85H Site Kuparuk 3H Pad Site Position: Northing: 6,000,110.73 usft Latitude: 700 24'41 .531 N From: Map Easting: 498,655.44 usft Longitude: 150° 0'39.416 W Position Uncertainty: 0.00 usft Slot Radius: 0.000in Grid Convergence: -0.01 ° Well -- 3H-01 � Well Position +N/ -S 0.00 usft Northing: 6,000,110.73 usft Latitude: 70° 24'41.531 N +E/ -W 0.00 usft Easting: 498,655.44 usft Longitude: 150° 0'39.416 W Position Uncertainty 0.00 usft Wellhead Elevation: usft Ground Level: 0.00 usft Wellbore 3H-01AL1 Magnetics Model Name Sample Date Declination Dip Angie Field Strength (°) (°) (nT) BG GM2018 12/1/2019 16.24 80.87 57,395 Design Audit Notes: Version: Vertical Section: 3H-01AL1_wp01 Phase: PLAN Tie On Depth: 8,400.00 Depth From (TVD) +N/ -S +E/ -W Direction (usft) (usft) (usft) (I 0.00 0.00 0.00 20.00 1011712019 9:00:45AM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips Dogleg Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc Kuparuk Project: Kuparuk River Unit Rate TFO Site: Kuparuk 3H Pad (°/100usft) (°/100usft) Well: 31-1-01 -4,477.66 -1,201.44 Wellbore: 3H-01 AL1 0.00 0.00 Design: 3H-01AL1_wp01 7.00 6.57 Plan Sections 20.03 -4,292.19 -1,131.88 7.00 -1.29 6.94 Measured -4,204.72 TVD Below Depth Inclination Azimuth 3.49 System (usft) (°) (°} 7.00 (usft) 8,400.00 93.87 16.23 5,862.08 8,470.00 98.47 17.92 5,854.56 8,600.00 96.79 26.94 5,837.26 8,700.00 90.72 30.44 5,830.71 9,050.00 87.76 6.11 5,835.41 9,250.00 86.14 20.04 5,846.11 9,500.00 89.89 2.93 5,854.84 9,800.00 90.26 23.93 5,854.44 10,000.00 90.49 9.93 5,853.13 10,200.00 90.48 23.93 5,851.43 10,300.00 84.42 20.42 5,855.88 10,400.00 89.79 15.93 5,860.93 10,600.00 90.28 1.94 5,860.80 11,000.00 90.25 29.94 5,858.91 11,150.00 90.24 19.44 5.858.26 11,300.00 85.01 10.32 5,864.47 11,600.00 85.35 31.40 5,889.97 ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3H-01 Mean Sea Level 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature Target 10/17/2019 9:00:45AM Page 3 COMPASS 5000.14 Build 85H Dogleg Build Turn +N/ -S +E/ -W Rate Rate Rate TFO (usft) (usft) (°/100usft) (°/100usft) (°/100usft) (°) -4,477.66 -1,201.44 0.00 0.00 0.00 0.00 -4,411.15 -1,181.01 7.00 6.57 2.42 20.03 -4,292.19 -1,131.88 7.00 -1.29 6.94 100.00 -4,204.72 -1,084.00 7.00 -6.07 3.49 150.00 -3,874.94 -975.06 7.00 -0.85 -6.95 -97.00 -3,680.88 -930.01 7.00 -0.81 6.96 97.00 -3,436.98 -880.49 7.00 1.50 -6.84 -78.00 -3,146.82 -811.20 7.00 0.12 7.00 89.00 -2,955.97 -753.10 7.00 0.12 -7.00 -89.00 -2,765.12 -695.00 7.00 -0.01 7.00 90.00 -2,672.67 -657.31 7.00 -6.06 -3.51 -150.00 -2,577.83 -626.18 7.00 5.37 -4.49 -40.00 -2,380.75 -595.20 7.00 0.24 -7.00 -88.00 -1,999.95 -486.46 7.00 -0.01 7.00 90.00 -1,863.85 -423.90 7.00 0.00 -7.00 -90.00 -1,719.21 -385.44 7.00 -3.49 -6.08 -120.00 -1,441.47 -279.59 7.00 0.11 7.02 90.00 Target 10/17/2019 9:00:45AM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc-Kuparuk Project: Kuparuk River Unit Site: Kuparuk 3H Pad Well: 3H-01 Wellbore: 3H-01AL1 Design: 3H-01 AL1_wp01 Planned Survey -4,115.65 -1,038.68 Measured Dogleg Toolface Depth Inclination Azimuth System (usft) +E] -W Section 8,400.00 93.87 16.23 TIP/KOP (usft) (usft) 8,470.00 98.47 17.92 Start DLS 7.00 TFO 100.00 8,500.00 98.10 20.01 8,600.00 96.79 26.94 Start DLS 7.00 TFO 150.00 8,700.00 90.72 30.44 Start DLS 7.00 TFO -97.00 7.00 8,800.00 89.87 23.49 8,900.00 89.01 16.54 9,000.00 88.17 9.59 9,050.00 87.76 6.11 Start DLS 7.00 TFO 97.00 -4,420.47 9,100.00 87.34 9.59 9,200.00 86.52 16.55 9,250.00 86.14 20.04 Start DLS 7.00 TFO -78.00 497,740.56 9,300.00 86.87 16.61 9,400.00 88.37 9.77 9,500.00 89.89 2.93 Start DLS 7.00 TFO 89.00 -3,530.85 9,600.00 90.01 9.93 9,700.00 90.14 16.93 9,800.00 90.26 23.93 Start DLS 7.00 TFO -89.00 9,900.00 90.38 16.93 10,000.00 90.49 9.93 Start DLS 7.00 TFO 90.00 10,100.00 90.49 16.93 10,200.00 90.48 23.93 Start DLS 7.00 TFO -150.00 10,300.00 84.42 20.42 Start DLS 7.00 TFO -40.00 10,400.00 89.79 15.93 Start DLS 7.00 TFO -88.00 10,500.00 90.04 8.93 10,600.00 90.28 1.94 Start DLS 7.00 TFO 90.00 10,700.00 90.28 8.94 10,800.00 90.27 15.94 10,900.00 90.26 22.94 11,000.00 90.25 29.94 Start DLS 7.00 TFO -90.00 11,100.00 90.25 22.94 11,150.00 90.24 19.44 Start DLS 7.00 TFO -120.00 11,200.00 88.50 16.41 11,300.00 85.01 10.32 Start DLS 7.00 TFO 90.00 11,400.00 85.05 17.35 11,500.00 85.16 24.37 10/17/2019 9:00:45AM ConocoPhillips Planning Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Well 3H-01 Mean Sea Level 31-1-01 @ 76.00usft (3H-01) True Minimum Curvature TVD Below -4,115.65 -1,038.68 Vertical Dogleg Toolface Map Map System +N/ -S +E] -W Section Rate Azimuth Northing Easting (usft) (usft) (usft) (usft) (°t100usft) (°) (usft) (usft) 5,862.08 -4,477.66 -1,201.44 -4,618.54 0.00 0.00 5,995,633.73 497,453.32 5,854.56 -4,411.15 -1,181.01 -4,549.06 7.00 20.03 5,995,700.23 497,473.75 5,850.23 -4,383.08 -1,171.37 -4,519.38 7.00 100.00 5,995,728.30 497,483.40 5,837.26 -4,292.19 -1,131.88 -4,420.47 7.00 100.30 5,995,819.17 497,522.90 5,830.71 -4,204.72 -1,084.00 -4,321.89 7.00 150.00 5,995,906.63 497,570.79 5,830.19 -4,115.65 -1,038.68 -4,222.69 7.00 -97.00 5,995,995.68 497,616.12 5,831.18 -4,021.75 -1,004.48 -4,122.76 7.00 -97.04 5,996,089.56 497,650.34 5,833.64 -3,924.43 -981.89 -4,023.58 7.00 -96.97 5,996,186.87 497,672.94 5,835.41 -3,874.94 -975.06 -3,974.74 7.00 -96.80 5,996,236.36 497,679.78 5,837.55 -3,825.46 -968.24 -3,925.91 7.00 97.00 5,996,285.83 497,686.61 5,842.91 -3,728.25 -945.67 -3,826.85 7.00 96.85 5,996,383.02 497,709.19 5,846.11 -3,680.88 -930.01 -3,776.98 7.00 96.48 5,996,430.38 497,724.86 5,849.16 -3,633.51 -914.32 -3,727.10 7.00 -78.00 5,996,477.74 497,740.56 5,853.32 -3,536.29 -891.54 -3,627.96 7.00 -77.79 5,996,574.95 497,763.35 5,854.84 -3,436.98 -880.49 -3,530.85 7.00 -77.51 5,996,674.25 497,774.42 5,854.92 -3,337.67 -869.30 -3,433.70 7.00 89.00 5,996,773.55 497,785.63 5,854.79 -3,240.47 -846.08 -3,334.42 7.00 88.99 5,996,870.74 497,808.86 5,854.44 -3,146.82 -811.20 -3,234.49 7.00 89.00 5,996,964.37 497,843.76 5,853.89 -3,053.17 -776.31 -3,134.55 7.00 -89.00 5,997,058.01 497,878.65 5,853.13 -2,955.97 -753.10 -3,035.28 7.00 -89.04 5,997,155.19 497,901.88 5,852.27 -2,858.77 -729.89 -2,936.00 7.00 90.00 5,997,252.38 497,925.11 5,851.43 -2,765.12 -695.00 -2,836.07 7.00 90.06 5,997,346.01 497,960.01 5,855.88 -2,672.67 -657.31 -2,736.30 7.00 -150.00 5,997,438.45 497,997.72 5,860.93 -2,577.83 -626.18 -2,636.54 7.00 -40.00 5,997,533.27 498,028.85 5,861.08 -2,480.24 -604.67 -2,537.47 7.00 -88.00 5,997,630.85 498,050.38 5,860.80 -2,380.75 -595.20 -2,440.75 7.00 -87.99 5,997,730.32 498,059.87 5,860.31 -2,281.27 -585.73 -2,344.02 7.00 90.00 5,997,829.80 498,069.35 5,859.82 -2,183.67 -564.21 -2,244.95 7.00 90.03 5,997,927.38 498,090.89 5,859.35 -2,089.43 -530.95 -2,145.02 7.00 90.07 5,998,021.60 498,124.16 5,858.91 -1,999.95 -486.46 -2,045.72 7.00 90.10 5,998,111.07 498,168.67 5,858.47 -1,910.46 -441.96 -1,946.41 7.00 -90.00 5,998,200.54 498,213.18 5,858.26 -1,863.85 -423.90 -1,896.43 7.00 -90.03 5,998,247.14 498,231.25 5,858.81 -1,816.29 -408.51 -1,846.47 7.00 -120.00 5,998,294.70 498,246.64 5,864.47 -1,719.21 -385.44 -1,747.36 7.00 -119.97 5,998,391.76 498,269.73 5,873.14 -1,622.54 -361.63 -1,648.38 7.00 90.00 5,998,488.42 498,293.55 5,881.68 -1,529.50 -326.17 -1,548.81 7.00 89.39 5,998,581.44 498,329.02 Page 4 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Planning Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well 3H-01 Company: ConocoPhillips Alaska Inc Kuparuk TVD Reference: Mean Sea Level Project: Kuparuk River Unit MD Reference: 3H-01 @ 76.00usft (3H-01) Site: Kuparuk 3H Pad North Reference: True Well: 3H-01 Survey Calculation Method: Minimum Curvature Wellbore: 31-1-01AL1 Design: 3H-01 AL1_wp01 Planned Survey Measured TVD Below Vertical Dogleg Toolface Map Map Depth Inclination Azimuth System +N/ -S +E/ -W Section Rate Azimuth Northing Easting (usft) (1) (o) (usft) (usft) (usft) (usft) (°/100usft) (1) (usft) (usft) 11,600 00 85.35 31 40 5,889.97 -1,441 47 -279.59 -1,450.16 7 00 88 79 5,998,669.46 498,375.61 Planned TD at 11600.00 Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 11,600.00 5,889.97 2-3/8" 2.375 3.000 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 8,400.00 5,862.08 -4,477.66 -1,201.44 TIP/KOP 8,470.00 5,854.56 -4,411.15 -1,181.01 Start DLS 7.00 TFO 100.00 8,600.00 5,837.26 -4,292.19 -1,131.88 Start DLS 7.00 TFO 150.00 8,700.00 5,830.71 -4,204.72 -1,084.00 Start DLS 7.00 TFO -97.00 9,050.00 5,835.41 -3,874.94 -975.06 Start DLS 7.00 TFO 97.00 9,250.00 5,846.11 -3,680.88 -930.01 Start DLS 7.00 TFO -78.00 9,500.00 5,854.84 -3,436.98 -880.49 Start DLS 7.00 TFO 89.00 9,800.00 5,854.44 -3,146.82 -811.20 Start DLS 7.00 TFO -89.00 10,000.00 5,853.13 -2,955.97 -753.10 Start DLS 7.00 TFO 90.00 10,200.00 5,851.43 -2,765.12 -695.00 Start DLS 7.00 TFO -150.00 10,300.00 5,855.88 -2,672.67 -657.31 Start DLS 7.00 TFO -40.00 10,400.00 5,860.93 -2,577.83 -626.18 Start DLS 7.00 TFO -88.00 10,600.00 5,860.80 -2,380.75 -595.20 Start DLS 7.00 TFO 90.00 11,000.00 5,858.91 -1,999.95 -486.46 Start DLS 7.00 TFO -90.00 11,150.00 5,858.26 -1,863.85 -423.90 Start DLS 7.00 TFO -120.00 11,300.00 5,864.47 -1,719.21 -385.44 Start DLS 7.00 TFO 90.00 11,600.00 5,889.97 -1,441.47 -279.59 Planned TD at 11600.00 10/17/2019 9:00:45AM Page 5 COMPASS 5000.14 Build 85H a N 3 - � p 000000000000000 LL LL LL LL LL LL LL L.L LL LL LL LL LL LL LL F F- HHHHH HF--HI-F-.- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LL J J J J tC CC''C r'C rIf'C c LL YO t 5t- �O w w w w w w w tw w0 - O M O O O o 0 0 0 0 0 0 cJ 0 C, O O O O p O 0 0 p 0 0 0 0 0 0 0 0 0 0 0 0N m O) 0 0 0 n D 0 0 0 0, 0 NO tfJ t7�O�f,;. a0 a00, OO)Nm 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 V' O Q O O O O ct N O M . N � C1� •- V O O M �!') t o m CO M t A M p a0 M c0 t- t/7O anN O�o]N o01� N� r 0IT07 W I.? cO LA N V M N O �LlON b'CO tDN I+N ISM to t!) I`- [Oc-�!- mcc! 0 cq 0P --(p aO h�0)oq NAY' 1 � N d' V O lo lo U o t f J N 1 O O M p� 1� mO n aO Mit cn t+� m V 7 NN c I? c? Oc,^ ctl� MOO^'� C7MC7 c?N N NN N� tb t� t0ZZ -T V M M oO M c, O ut N 1� V . c9 V im. V N a> N O N V tT lo R M 7 t A 0 0 o p o 0 t 6 to Loc) V'u7�L��coco N c0 co qp W M a0 aO W OO c0 t%) OD cp c0 oO cb an t!> tt1 �j to «] tt7 tf) tIJ to ll) to M N ct its V C tM M NCM V r tN O N 01 O V r O O) 0' O1 aT 'V O M O Rt M V' N M N N N N N M N Q U I f mNc V mco rna Nrna t C o I- 1- I- <- -0 N d' <t 'V N N N p M �O O>O]O�O�oJ aDN 6)rn(T �c00)tTlrn OcO � O L lO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ^ + p 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O p O� 4 7 0 0 0 0 0 V V .0 w.00 Nm cOONM V' cOO�Mcp c O W c O c 0 6� 0 0 4) O cc:)) z 0�-- r N M C Y t n O^ a 0 0 0 r N M A O V ,.x N"IL- --i �- - - - YI - --- - - o ..r7� 4a q z g z 200 z 3lor E ry o- 4 a LL y o y � � '�+' { IF' - =.`L .y ..>,{ _._Y _ -�- I•-.__— -. Y.—c r_ It .,_ _ __ — _' _ _ o :< .T y j T o �H r �f9 41 jj r' Lu IJJ 0 7E r � Lu a - -—� o 3 r a a� h i 1 Mj 4 N o o M E , z i O ' { v ro 0 r- j I as r I - L � d o � V � o O O O O O O O O O O O O O O O O O O O O O O O O 00 O O O 00 O 00 O 00 O 00 O 00 O 00 O O O 00 O 00 O R - - (uiy}jsn 'OOS) i+)fploi•U(-)�Imos C CC 3 ZI-- KUP PROD 3H-01 COnocvPhiliips Alaska, in . .• Well Attributes Max Angle & MD TD Wellbore APINWI Field Name Wellbore Status nil (°) MD (ftKB) Act atm (ftKB) 501032008400 KUPARUK RIVER UNIT PROD 48.55 3,900.00 8,167.0 Comment H21, (ppm) I Date SSSV: NONE 175 4/30/2016 Annotation End Data KB-Grd (it) Rig Release Data Last WO: 4/11/2015 42.01 11/8/1987 3H 01, 112120184:16:13 PM Verticalschematio actual Annotation Depth (ftKB) Entl Dele Last Tag: SLM 17,720.0 3/28/2015 Annotation Last Mod By I End Date Rev Reason: 1-12S pproven 1/2/2018 - HANGER, 31.0 CONDUCTOR; 36.0-1150 GAS LIFT; 2,935.6 SURFACE; 35.0-3,576] GAS LIFT; 4,636 9 GAS LIFT; 5,900.9 GAS LIFT 6,516 s GAS LIFT; 7,008.7 LOCATOR; 7,065.0 SEAL ASSY: 7,066.0 PBR; 7,072.2 PACKER; ],095.2 NIPPLE; 7,485.4 OVERSHOT; 7,503.1 PBR; 7,529.5 PACKER; 7,543.3 NIPPLE; 7,581.3 SOS; 7,613.8 (PERF; 7.712.0-7,716.0 RPERF; 7,684.0-7,752.0 (PERF; 7,722.0-7,730.0 APERF; 7,758.0-7,770.0 APERF; 7,782.0-7,800.0- APERF; 7.822.0 -7,13,10.0 - 822.0-7,840.0PRODUCTION; 33.0-8,076.4 PRODUCTION; ---- 7C-3,31-1-01 - Casing Strings Casing Description OD (in) ID (in) Top(ftKB) Set Depth (ftKB) Set Depth (TVD)... WVLen (I... Grade Top Thread CONDUCTOR 16 15.062 36.0 115.0 115.0 62.50 H-40 WELDED Casing Description OD (in) ID (in)Top (ftKB) Set Depth (ftK8) Set Depth (TVD)... Wt7Len (I... Gmde Top Thread SURFACE 9518 81921 35.0 3,576.7 2,942.4 36.00 J-55 BTC Casing Description OD (!n) ID (in) Top (ftKB) Set Depth (ftKB) Set Depth (TVD)... WVLen (I... Grade Top Thread PRODUCTION 7 6.276 33.0 8,076.4 6,155.4 26.00 J-55 BTC Tubing Strings Tubing Description String Ma... ID (in) Top (ftKB) Sel Depth (ft.. Sel Depth (TVD) (... Wt (Ib/fl) Grade Top Connection TUBING -2015 WO 3112 2.992 31.0 7,t, 5,723.3 9.30 L-80 EUEBrdABMOD Completion Details Nominal ID Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com (in) 31.0 31.0 0.67 HANGER FMC TUBING HANGER 2.992 7,065.0 5,392.6 42.61 LOCATOR LOCATOR 2.990 7,066.0 5,393.3 42.60 SEAL ASSY BAKER 80-40 SEAL ASSEMBLY 3.000 7,072.2 5,397.9 42.56 PBR BAKER 8040 PER 4.000 7,095.2 5,414.8 42.40 PACKER BAKER FHL RETRIEVABLE PACKER 47132 2.930 7,485.4 5,705.0 41.40 NIPPLE DS NIPPLE 2.813 7,503.1 1 5,718.31 41.30 1 OVERSHOT I BAKER POOR BOY OVERSHOT 3.750 Tubing Description 15tnng Ma... ID (!n) Tap (ftKB) Set Depth (ft.. Set Depth (TVD) I... Wt (Ib Grade Top Connection TUBING -ORIGINAL 31/2 2.992 7,504.7 7,614.6 5,802.4 9.30 J-55 EUE8rdABMOD Completion Details Nominal ID Top (ftKB) I Top (TVD) (ftKB) Top Incl (°) Item Des Com (in) 7,529.5 5,738.2 41.17 PBR BAKER PER 3.000 7,543.3 5,748.5 41.10 PACKER BAKER'FHL' PACKER 2.937 7,581.3 5,777.2 40.91 NIPPLE CAMCO'D' NIPPLE NO GO 2.750 7.613.8 5.801.8 40.80 SOS CAMCO SHEAROUT SUB 2.937 perforations & Slots Top (ftKB) Bt. (ftKB) Top (TVD) (ftKB) Bum (TVD) (ftKB) Zone Data Shot Dens (shols/f t) Type Com 7,684.0 7,752.0 5,855.0 5,906.8 UNIT D, C4, 8/21/1988 12.0 RPERF 2 1/8" EnerJet; 60 deg. ph 7,712.0 7,716.0 5,876.2 5,879.3 C4,31-1-01 12/3/1987 2.0 (PERF 4" Dens! Jet; 120 deg. ph 7,722.0 7,730.0 5,883.8 5,889.9 C4,31-1-01 12/3/1987 2.0 (PERF 4" Densi Jet; 120 deg. ph 7,758.0 7,770.0 5,911.4 5,920.6 A-3, 31-1-01 8/21/1988 8.0 APERF 2 1/8" EnerJet; 60 deg. ph 7,782.0 7,800.0 5,929.8 5,943.6 A-2, 3H-01 8/21/1988 8.0 APERF 2 1/8"EnerJet; 60 deg. ph 7,822.0 7,840.0 5,960.4 5,974.2 A-1, 31-1-01 5/21/1988 8.0 APERF 2.5" Scallop; 90 deg. ph Mandrel Inserts at ali N Top (TVD) Valve Latch Port Size TRO Run lop (ftKB) (ftKB) Make Model Do (In) Sam Type Type (in) (psi) Run Date Com Awl 1 2,935.6 2,505.5 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,235.0 4/24/2015 2 4,636.9 3,657.9 CAMCO MMG 1 1/2 GAS LIFT GLV RK 0.188 1,238.0 4/24/2015 3 5,900.9 4,552.4 CAMCO MMG 1 1/2 GAS LIFT OV RK 0.250 0.0 4/24/2015 4 6,516.6 4,996.6 CAMCO MMG 1 1/2 GAS LIFT DMY RK 0.000 0.0 4/17/2015 5 7,008.7 5,351.3 CAMCO MMG 1 1 1/2 GAS LIFT DMY RK 0.000 O.0 4/24/2015 DCRI Notes: General & Safety End Date Annotation 7/7/2007 NOTE: WAIVERED WELL- IA X OA COMMUNICATION 3/3/2010 NOTE: VIEW SCHEMATIC w/Alaska Schematic9.0 3H-01 Proposed CTD Schematic 16" 62# H-40 shoe Co. 115' MD 9-5/8" 36# J-55 shoe @ 3577' MD Liner Top Packer Proposed KOP @ 7785' MD 3-1/2" 9.3# L-80 ELIE 8rd Tubing to surface 3-1/2" Camco MMG gas lift mandrels @ 2936', 4637', 5910', 6517', & 7009' RKB Baker 3-1/2" PBR 7072' MD (4" ID) Baker FHL Packer @ 7095' MD (2.93" ID) 3-%" DS landing nipple at 7485' MD (2.813" ID) Baker Poor Boy Overshot @ 7506' RKB Baker 3-1/2" PBR 7530' MD (3" ID) Baker FHL packer @ 7543' MD (2.937" ID) Camco D -Nipple @ 7581' MD (2.75" Min ID) Camco SOS @ 7614" MD 3H-01AL1 wp01 TD 11,600' MD Top of Liner —7,560' MD 3H -01A wp02 0 Swell Packer TD 11,600' MD Top of Billet @ 8400' MD ConocoPhillips ConocoPhillips Alaska Inc _Kuparuk Kuparuk River Unit _2 Kuparuk 3H Pad 3H-01 3H-01AL1 3H-01AL1_wp01 Anticollision Report 16 October, 2019 ConocoPhillips Company: ConocoPhillips Alaska Inc-Kuparuk Project: Kuparuk River Unit _2 Reference Site: Kuparuk 3H Pad Site Error: 0.00 usft Reference Well: 31-1-01 Well Error: 0.00 usft Reference Wellbore 3H-01AL1 Reference Design: 3H-01AL1_wp01 Reference 3H-01AL1_wp01 ConocoPhillips Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference Interpolation Method: MD Interval 25.00usft Error Model: Depth Range: 8,400.00 to 11,600.00usft Scan Method: Results Limited by: Maximum ellipse separation of 3,000.00 usft Error Surface: Warning Levels Evaluated at: 2.79 Sigma Casing Method: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum ISCWSA Tray. Cylinder North Combined Pedal Curve Added to Error Values Survey Tool Program Date 10/16/2019 Offset Distance From To Measured Measured (usft) (usft) Survey (Wellbore) Tool Name Description 100.00 7,700.00 31-1-01 (31-1-01) BOSS -GYRO Sperry -Sun BOSS gyro multishot 7,700.00 8,400.00 3H-01A_wp02 (31-1-01A) MWD OWSG OWSG MWD - Standard 8,400.00 11,600.00 3H-01AL1_wp01 (31-1-01AL1) MWD OWSG OWSG MWD - Standard Summary Offset Design Reference Offset Distance Measured Measured Between Between Separation Warning Site Name Depth Depth Centres Ellipses Factor Offset Well - Wellbore - Design (usft) (usft) (usft) (usft) Depth Kuparuk 3H Pad Depth from North (usft) 31-1-01 - 31-1-01 - 31-1-01 8,401.86 7,700.00 309.18 306.43 112.129 CC, ES, SF 31-1-01 - 3H -01A - 3H-01A_wp02 9,255.09 9,250.00 10.95 7.56 3.233 CC 31-1-01-3H-01A-3H-01A_wp02 11,375.82 11,375.00 12.90 -44.13 0.226 STOP Drilling, SF 31-1-01-3H-01A-3H-01A_Wp02 11,400.90 11,400.00 15.13 -46.83 0.244 STOP Drilling, ES 31-1-02 - 31-1-02 - 31-1-02 0.00 -53.96 8,453.42 5,932.84 Out of range 3H-03 - 3H-03 - 31-1-03 4.81 0.00 -51.01 8,470.00 Out of range 31-1-05 - 3H-05 - 31-1-05 10,150.00 6,750.00 1,004.90 797.13 4.837 CC, ES 31-1-05 - 31-1-05 - 31-1-05 10,150.00 6,775.00 1,005.46 797.35 4.831 SF 31-1-06 - 31-1-06 - 31-1-06 5,926.23 7,550.00 5,753.61 4.86 Out of range 31-1-07 - 31-1-07 - 31-1-07 8,509.33 5,924.93 7,525.00 5,734.78 Out of range 31-1-09 - 31-1-09 - 31-1-09 -39.38 8,521.70 5,923.23 7,500.00 Out of range 3H-26 - 31-1-261-1 - 31-1-261-1 11,579.96 6,725.00 85.99 -140.10 0.380 STOP Drilling, CC, ES, SF 31-1-26 - 31-1-261-1-01 - 31-1-261-1-01 11,579.96 6,725.00 85.99 -140.10 0.380 STOP Drilling, CC, ES, SF 3H-26 - 31-1-261-1-02 - 31-1-261-1-02 11,579.96 6,725.00 85.99 -140.10 0.380 STOP Drilling, CC, ES, SF Offset Design Kuparuk 3H Pad - 31-1-01 - 31-1-01 - 31-1-01 Survey Program: 100 -BOSS -GYRO Reference Offset Semi Major Axis Measured Vertical Measured Vertical Reference Offset Azimuth Depth Depth Depth Depth from North (usft) (usft) (usft) (usft) (usft) (usft) (") 8,401.86 5,937.95 7,700.00 5,867.13 4.76 0.00 -60.46 8,416A3 5,936.64 7,675.00 5,848.18 4.77 0.00 -57.11 8,435.61 5,934.95 7,650.00 5,829.23 4.79 0.00 -53.96 8,453.42 5,932.84 7,625.00 5,810.30 4.81 0.00 -51.01 8,470.00 5,930.56 7,600.00 5,791.37 4.83 0.00 -48.30 8,484.12 5,928.50 7,575.00 5,772.47 4.84 0.00 -45.10 8,500.00 5,926.23 7,550.00 5,753.61 4.86 0.00 41.91 8,509.33 5,924.93 7,525.00 5,734.78 4.88 0.00 -39.38 8,521.70 5,923.23 7,500.00 5,715.98 4.89 0.00 -36.76 8,533.92 5,921.58 7,475.00 5,697.22 4.91 0.00 -34.28 8,550.00 5,919.46 7,425.00 5,659.83 4.93 0.00 -30.32 Offset Wellbore Centre -NIS +El -W (usft) (usft) -4,396.31 -1,491.17 4,380.01 -1,490.92 -4,36370 -1,490.65 -4,347.38 -1,490.38 4,331.05 -1,490.10 -4,314.69 -1,489.82 4,298.29 -1,489.54 -4,281.85 -1,489.27 -4,265.36 -1,489.01 -4,248.84 -1,488.73 -4,215.66 -1,488.01 Distance Between Between Centres Ellipses (usft) (usft) 309.18 306.43 317.91 315.09 327.42 324.55 337.58 334.68 348.31 345.36 359.68 356.65 371.79 368.70 384.50 381.27 397.84 394.52 411.71 408.30 440.88 437.21 Minimum Separation (usft) 2.76 2.82 2.87 2.90 295 3.04 3.09 3.23 3.32 3.41 3.66 Offset Site Error: 0.00 usft Offset Well Error: 0.00 usft Separation Factor 112.129 CC, ES, SF 112.658 114.099 116.330 118.009 118.508 120.450 119.087 119.836 120.862 120.340 Warning CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/162019 1 27 37PM Page 2 COMPASS 5000 14 Build 85H Offset Design Kuparuk 3H Pad - 31-1-01 - 31-1-01 - 31-1-01 ConocoPhillips Offset Site Error: 0 00 usft ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Well 31-1-01 Project: Kuparuk River Unit -2 TVD Reference: 31-1-01 @ 76.00usft (31-1-01) Reference Site: Kuparuk 3H Pad MD Reference: 31-1-01 @ 76.00usft (31-1-01) Site Error: 0.00 usft North Reference: True Reference Well: 31-1-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 2.00 sigma Reference Wellbore 31-1-01AL1 Database: EDT 14 Alaska Production Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Offset Datum Offset Design Kuparuk 3H Pad - 31-1-01 - 31-1-01 - 31-1-01 Offset Site Error: 0 00 usft Survey Program: 100 -BOSS -GYRO Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North +N/S +E/ -W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) 8,550.00 5,919.46 7,450.00 5,678.51 4.93 0.00 -31.61 -4,232.27 -1,488.40 42606 422.62 3.44 123.926 8,569.70 5,916.95 7,400.00 5,641.18 4.97 0.00 -27.59 -4,199.00 -1,487.57 455.90 452.25 3.65 125.010 8,581.33 5,915.51 7,375.00 5,622.56 4.99 0.00 -25.58 -4,182.33 -1,487.06 471.38 467.66 3.72 126.674 8,600.00 5,913.26 7,325.00 5,585.33 5.02 0.00 -22.16 -4,148.98 -1,485.78 503.28 499.37 3.90 128.956 8,600.00 5,913.26 7,350.00 5,603.95 5.02 0.00 -23.10 4,165.66 -1,486.46 487.25 483.53 3.72 131.153 8,614.74 5,911.63 7,300.00 5,566.72 5.06 0.00 -20.68 -4,132.31 -1,485.01 519.61 515.68 3.93 132.074 8,625.22 5,910.61 7,275.00 5,548.12 5.08 0.00 -19.42 -4,115.62 -1,484.14 536.23 532.23 4.00 133.924 8,635.46 5,909.73 7,250.00 5,529.54 5.10 0.00 -18.21 -4,098.93 -1,483.15 553.09 549.02 4.07 135.831 8,650.00 5,908.66 7,200.00 5,492.44 5.13 0.00 -16.14 4,065.49 -1,480.86 587.50 583.25 4.25 138.362 8,650.00 5,908,66 7,225.00 5,510.98 5.13 0.00 -16.88 4,082.22 -1,482.06 570.20 566.10 4.10 139.137 8,664.75 5,907.81 7,175.00 5,473.91 5.17 0.00 -14.89 -4,048.76 -1,479.58 604.97 600.70 4.27 141.746 8,674.05 5,907.39 7,150.00 5,455.40 5.19 0.00 -13.88 -4,032.01 -1,478.26 622.72 618.39 4.33 143.791 8,683.12 5,907.07 7,125.00 5,436.90 5.21 0.00 -12.91 -4,015.24 -1,476.89 640.68 636.29 4.39 145.887 8,700.00 5,906.71 7,100.00 5,418.43 5.26 0.00 -11.70 -3,998.46 -1,475.47 656.95 654.55 4.39 149.992 8,702.14 5,906.68 7,07500 5,399.98 5.26 0.00 -11.27 -3,981.65 -1,473.98 677.21 672.71 4.50 150.543 8,731.83 5,906.38 7,050.00 5,381.58 5.34 0.00 -12.78 -3,964.80 -1,472.37 695.42 691.01 4.42 157.403 8,762.29 5,906.21 7,025.00 5,363.24 5.42 0.00 -14.32 -3,947.90 -1,470.64 713.29 708.95 4.34 164.348 8,793.44 5,906.18 7,000.00 5,344.94 5.50 0.00 -15.88 -3,930.96 -1,468.80 730.81 726.55 4.27 171.276 8,825.15 5,906.30 6,975.00 5,326.69 558 0.00 -17.46 -3,913.99 -1,466.86 748.00 743.79 4.20 178.082 8,857.29 5,906.57 6,950.00 5,308A7 5.65 0.00 -19.04 -3,897.00 -1,464.83 764.86 760.72 4.14 184.716 6,889.76 5,907.01 6,925.00 5,290.28 5.72 0.00 -20.62 -3,879.98 -1,462.71 781.40 777.31 4.09 190.994 8,922.44 5,907.60 6,900.00 5,272.12 5.78 0.00 -22.19 -3,862.93 -1,460.51 797.64 793.58 4.05 196.808 8,955.19 5,908.35 6,875.00 5,253.99 5.84 0.00 -23.73 -3,645.88 -1,458.21 813.58 809.55 4.03 202.101 8,987.87 5,909.26 6,850.00 5,235.87 5.89 0.00 -25.23 -3,828.82 -1,455.81 829.23 825.22 4.01 206.683 9,020.35 5,910.32 6,825.00 5,217.77 5.93 0.00 -26.69 -3,811.76 -1,453.30 844.63 840.61 4.01 210.556 9,050.00 5,911.41 6,800.00 5,199.68 5.96 0.00 -27.94 -3,794.70 -1,450.68 859.78 855.75 4.03 213.476 9,060.54 5,911.83 6,775.00 5,181.62 5.97 0.00 -26.51 -3,777.63 -1,448.00 874.96 870.86 4.09 213.740 9,070.32 5,912.24 6,750.00 5,163.58 5.98 0.00 -25.17 -3,760.53 -1,445.28 890.36 886.20 4.16 214.055 9,080.09 5,912.66 6,725.00 5,145.58 5.99 0.00 -23.85 -3,743.40 -1,442.52 905.97 901.74 4.22 214.494 9,100.00 5,913.55 6,650.00 5,091.76 6.01 0.00 -20.73 -3,691.86 -1,434.06 954.04 949.61 4.43 215.524 9,100.00 5,913.55 6,675.00 5,109.67 6.01 0.00 -21.30 -3,709.07 -1,436.90 937.77 933.42 4.35 215.749 9,100.00 5,913.55 6,700.00 5,127.61 6.01 0.00 -21.90 -3,726.25 -1,439.72 921.87 917.60 4.27 216.103 9,119.04 5,914.46 6,625.00 5,073.87 6.04 0.00 -18.93 -3,674.64 -1,431.20 970.33 965.86 4.47 217.063 9,128.74 5,914.95 6,600.00 5,056.00 6.06 0.00 -17.78 -3,657.39 -1,428.32 986.87 982.34 4.53 217.870 9,138.41 5,915.44 6,575.00 5,038.17 6.07 0.00 -16.65 -3,640.11 -1,425.43 1,003.56 998.98 4.59 218.752 9,150.00 5,916.05 6,525.00 5,002.63 6.09 0.00 -14.99 -3,605.42 -1,419.59 1,037.44 1,032.73 4.71 220.134 9,150.00 5,916.05 6,550.00 5,020.38 6.09 0.00 -15.43 -3,622.79 -1,422.52 1,020.41 1,015.77 4.64 219.844 9,167.33 5,917.01 6,500.00 4,984.92 6.12 0.00 -13.43 -3,588.02 -1,416.65 1,054.51 1,049.75 4.76 221.551 9,176.91 5,917.55 6,475.00 4,967.23 6.14 0.00 -12.41 -3,570.61 -1,413.71 1,071.77 1,066.95 4.82 222.553 9,186.43 5,918.10 6,450.00 4,949.52 6.16 0.00 -11.42 -3,553.21 -1,410.77 1,089.20 1,064.33 4.87 223.620 9,200.00 5,918.91 6,400.00 4,914.05 6.19 0.00 -9.84 -3,518.46 -1,404,89 1,124.56 1,119.58 4.98 225.677 9,200.00 5,918.91 6,425.00 4,931.79 6.19 0-00 -10.18 -3,535.83 -1,407.83 1,106.80 1,101.88 4.92 224.950 9,214.59 5,919.81 6,375.00 4,896.26 6.23 0-00 -8.58 -3,501.14 -1,401.97 1,142.46 1,137.43 5.03 227.005 9,223.79 5,920.39 6,350.00 4,878.40 6.26 0.00 -7.68 -3,483.89 -1,399.07 1,160.59 1,155.50 5.09 228.214 9,232.88 5,920.98 6,32500 4,860.46 6.28 0.00 -6.80 -3,466.72 -1,396.21 1,178.90 1,173.76 5.14 229.489 9,250.00 5,922.11 6,30000 4,842.43 6.33 0.00 -5.41 -3,449.63 -1,393.37 1,197.45 1,192.27 5.18 231.023 9,263.13 5,922.98 6,27500 4,824.37 6.36 0.00 -6.00 -3,432.58 -1,390.52 1,216.04 1,210.80 5.23 232.348 9,430.10 5,930.06 6,250.00 4,806.29 6.80 0.00 -16.63 -3,415.56 -1,387.60 1,233.59 1,228.24 5.36 230.272 9,500.00 5,930.84 6,225.00 4,788.21 6.96 0.00 -20.93 -3,398.56 -1,384.62 1,249.49 1,243.99 5.50 227.098 9,517.29 5,930.87 6,200.00 4,770.11 7.01 0.00 -19.31 -3,381.59 -1,381.57 1,265.29 1,259.72 5.57 227.118 9,528.07 5,930.88 6,175.00 4,752.01 7.04 0.00 -18.16 -3,364.63 -1,378.46 1,281.25 1,275.62 5.63 227.716 9,538.88 5,930.89 6,150.00 4,733.91 7.07 0.00 -17.03 -3,347.67 -1,375.30 1,297.32 1,291.64 5.68 228.346 CC - Min centre to center distance or covergent point, SF - min separation factor. ES - min ellipse separation 10/16/2019 1 27 37PM Page 3 COMPASS 5000 14 Build 85H ConocoPhillips Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: ConocoPhillips Alaska Inc—Kuparuk Kuparuk River Unit _2 Kuparuk 3H Pad 0.00 usft 3H-01 0.00 usft 3H-01AL1 3H-01AL1_wp01 ConocoPhillips Anticollision Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-01 - 31-1-01 - 31-1-01 offset site Error: 0.00 usft Survey Program: 100 -BOSS -GYRO Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North -NIS -EI-W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) 9,550.00 5,930.91 6,125.00 4,715.82 7.10 000 -15.89 -3,330.72 -1,372.08 1,313.51 1,307.77 5.74 228.985 9,560.60 5,930.91 6,100.00 4,697.73 7.14 0.00 -14.80 -3,313.77 -1,368.81 1,329.81 1,324.01 5.79 229.603 9,571.48 5,930.92 6,075.00 4,679.63 7.19 0.00 -13.71 -3,296.85 -1,365.52 1,346.24 1,340.39 5.85 230.231 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27:37PM Page 4 COMPASS 5000 14 Build 85H Offset Design ConocoPhillips r ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc_Kuparuk Local Co-ordinate Reference: Well 31-1-01 Project: Kuparuk River Unit_2 TVD Reference: 3H-01 @ 76.00usft (3H-01) Reference Site: Kuparuk 3H Pad MD Reference: 31-1-01 @ 76.00usft (31-1-01) Site Error: 0.00 usft North Reference: True Reference Well: 31-1-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 2.00 sigma Reference Wellbore 3H-01AL1 Database: EDT 14 Alaska Production Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Offset Datum Offset Design Kuparuk 3H Pad - 31-1-01 - 3H -01A- 3H-01A_wp02 Offset Site Error: 0.00 usft Survey Program: 100 -BOSS -GYRO, 7700 -MWD OWSG Offset Well Error: 0.00 Usti Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North tNI-S aEt-W Centres Ellipses Separation Factor (usft) (usft) (usft) lush) (usft) (usft) (I (usft) (usft) (usft) (usft) (usft) 8,401.86 5,937.95 7,700.00 5,867.13 0.01 0.00 -60.46 -4,396.31 -1,491.17 309.18 308.95 0.23 1,328.660 8,418.43 5,936.64 7675.00 5,848.18 0.03 0.00 -57.11 -4,380.01 -1,490.92 317.91 317.66 025 1,277.043 8,424.99 5,936.03 8,425.00 5,93640 0.04 0.05 -108.45 -4,453.60 -1,194.83 0.63 0.34 0.29 2.166 Caution Monitor Closely 8,435.61 5,934.95 7,650.00 5,829.23 0.05 0.00 -53.96 -4,363.70 -1,490.65 327.42 327.15 0.27 1,220.222 8449.91 5,933.29 8,450.00 5,934.80 0.07 0.10 -122.25 -4,429.55 -1,188.24 2.01 1.66 0.35 5.714 8453.42 5,932.84 7,625.00 5,810.30 0.08 0.00 -51.01 -4,347.38 -1,490.38 337.58 337.29 0.29 1,171.991 8,470.00 5,930.56 7,600.00 5,791.37 0.11 0.00 -48.30 -4,331.05 -1,490.10 348.31 348.00 0.31 1,131.947 8,474.75 5,929.86 8,475.00 5,933.39 0.11 0.17 -137.34 -4,405.68 -1,180.93 3.92 3.51 040 9.745 8,484.12 5,928.50 7,575.00 5,772.47 0.13 0.00 -45.10 -4,314.69 -1,489.82 359.68 359.35 0.33 1,100.465 8499.61 5,926.29 8,500.00 5,932.14 0.16 0.23 -143.06 -4,382.04 -1,172.91 6.18 5.73 0.45 13.776 8,500.00 5,926.23 7,550.00 5,753.61 0.16 0.00 -41.91 -4,298.29 -1,489.54 371.79 371.44 0.35 1,070.639 8,509.33 5,924.93 7,525.00 5,734.78 0.17 0.00 -39.38 -4,281.85 -1,489.27 384.50 384.14 0.36 1,053.460 8,521.70 5,923.23 7,500.00 5,715.98 0.20 0.00 -36.76 -4,265.36 -1,489.01 397.84 397.46 0.39 1,030.960 8,524.48 5,922.85 8,525.00 5,931.07 0.20 0.31 -144.69 -4,358.63 -1,164.18 8.54 8.04 0.50 16.933 8,533.92 5,921.58 7,475.00 5,697.22 0.22 0.00 -34.28 -4,248.84 -1,488.73 411.71 411.30 0.41 1,012.624 8,549.35 5,919.55 8,550.00 5,930.18 0.25 0.39 -144.80 -4,335.49 -1,154.77 10.96 10.40 0.56 19.562 8,550.00 5,919.46 7,425.00 5,659,83 0.26 0.00 -30.32 -4,215.66 -1,488.01 440.88 440.44 0.44 1,004.204 8,550.00 5,919.46 7,450.00 5,678.51 0.26 0.00 -31.61 -4,232.27 -1,488.40 426.06 425.63 0.43 988.955 8,569.70 5,916.95 7,400.00 5,641.18 0.30 0.00 -27.59 -4,199.00 -1,487.57 455.90 455.43 0.47 960.725 8,574.23 5,916.38 8,575.00 5,929.47 0.31 0.48 -144.21 -4,312.64 -1,144.66 13.41 12.79 0.62 21.559 8,581.33 5,915.51 7,375.00 5,622.56 0.33 0.00 -25.58 -4,182.33 -1,487.06 471.38 470.88 0.50 945.493 8,599.11 5,913.36 8,600.00 5,928.93 0.37 0.58 -143.23 -4,290.09 -1,133.88 15.91 15.23 0.68 23.260 8,600.00 5,913.26 7,325.00 5,585.33 0.38 0.00 -22.16 -4,148.98 -1,485.78 503.28 502.74 0.54 932.429 8,600.00 5,913.26 7,350.00 5,603.95 0.38 0.00 -23.10 -4,165.66 -1,486.46 487.25 486.72 0.53 916.832 8,614.74 5,911.63 7,300.00 5,566.72 0.42 0.00 -20.68 -4,132.31 -1,485.01 519.61 519.04 0.57 905.712 8,624.40 5,910.69 8,625.00 5,928.57 0.45 0.66 -143.32 -4,267.87 -1,122.43 18.18 17.43 0.75 24.365 8,625.22 5,910.61 7,275.00 5,548.12 0,45 0.00 -19.42 -4,115.62 -1,484.14 536.23 535.64 0.60 894.086 8,635.46 5,909.73 7,250.00 5,529.54 0.48 0.00 -18.21 -4,098.93 -1,483.15 553.09 552.47 0.63 884.848 8,649.79 5,908.67 8,650.00 5,928.30 0.52 0.80 -141.87 -4,245.64 -1,111.00 19.94 19.12 0.82 24.374 8,650.00 5,908.66 7,200.00 5,492.44 0.52 0.00 -16.14 -4,065.49 -1,480.86 587.50 586.83 0.66 884.364 8,650.00 5,908.66 7,225.00 5,510.98 0.52 0.00 -16.88 -4,082.22 -1,482.06 570.20 569.54 0.66 867.258 8,664.75 5,907.81 7,175.00 5,473.91 0.57 0.00 -14.89 -4,048.76 -1,479.58 604.97 604.27 0.70 860.069 8,674.05 5,907.39 7,150.00 5,455.40 0.60 0,00 -13.88 -4,032.01 -1,478.26 622.72 621.99 0.73 852.954 8,675.20 5,907.35 8,675.00 5,928.03 0.60 0.91 -137.16 -4,223.08 -1,100.24 21.27 20.35 0.92 23.058 8,683.12 5,907.07 7,125.00 5,436.90 0.63 0.00 -12.91 -4,015.24 -1,476.89 640.68 639.93 0.76 847.525 8,700.00 5,906.71 7,100.00 5,418.43 0.69 0.00 -11.70 -3,998.46 -1,475.47 658.95 658.15 0.80 825.400 8,700.51 5,906.70 8,700.00 5,927.76 0.69 1.02 -129.70 -4,200.19 -1,090.18 22.40 21.32 1.08 20.761 8,702.14 5,906.68 7,075.00 5,399.98 0.70 0.00 -11.27 -3,981.65 -1,473.98 677.21 676.40 0.81 836.454 8,725.66 5,906.43 8,725.00 5,927.49 0.79 1.14 -123.98 -4,177.01 -1,080.82 23.71 22.42 1.29 18.351 8,731.83 5,906.38 7,050.00 5,381.58 0.81 0.00 -12.78 -3,964.80 -1,472.37 695.42 694.53 0.89 782.256 8,750.90 5,906.26 8,750.00 5,927.23 0.88 1.25 -119.03 -4,153.56 -1,072.18 25.31 23.79 1.52 16.650 8,762.29 5,906.21 7,025.00 5,363.24 0.93 0.00 -14.32 -3,947.90 -1,470.64 713.29 712.32 0.97 736.490 8,776.25 5,906.18 8,775.00 5,926.96 0.98 1.36 -114.82 -4,129.85 -1,064.26 27.14 25.38 1.76 15.458 8.79344 5,906.18 7,000.00 5,344.94 1.05 0.00 -15.88 -3,930.96 -1,468.80 730.81 729.76 1.05 696.473 8,801.70 5,906.20 8,800.00 5,926.70 1.08 1.48 -111.30 -4,105.91 -1,057.06 29.15 27.17 1.99 14.677 8,825.15 5,906.30 6,975.00 5,326.69 1.18 0.00 -17.46 -3,913.99 -1,466.86 748.00 746.86 1.13 661.266 8,827.26 5,906.31 8,825.00 5,926.43 1.19 1.59 -108.37 -4,081.76 -1,050.60 31.32 29.11 2.21 14.151 8,852.99 5,906.53 8,850.00 5,926.24 1.29 1.70 -106.83 -4,057.61 -1,044.14 33.03 30.61 2.42 13.675 8,857.29 5,906.57 6,950.00 5,30847 1.31 0.00 -19.04 -3,897.00 -1,464.83 764.86 763.65 1.21 631.689 8,878.89 5,906.85 8,875.00 5,926.17 1.40 1.82 -107.12 -4,033.67 -1,036.96 33.60 31.01 2.59 12.980 8,889.76 5,907.01 6,925.00 5,290.28 1.44 0.00 -20.62 -3,879.98 -1,462.71 781.40 780.11 129 605.748 8,904.81 5,907.26 8,900.00 5,926.24 1.51 1.95 -108.99 -4,009.95 -1,029.07 32.94 30.22 2.72 12.101 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27 37PM Page 5 COMPASS 5000 14 Build 85H Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 3H-01 @ 76.00usft (31H-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-01 - 3H -01A - 3H-01A_wp02 ConocoPhillips V ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Project: Kuparuk River Unit_2 ND Reference: Reference Site: Kuparuk 3H Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 31-1-01 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 3H-01AL1 Database: Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 3H-01 @ 76.00usft (31H-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-01 - 3H -01A - 3H-01A_wp02 Offset Site Error: 0.00 usft Survey Program: 100 -BOSS -GYRO, 7700 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North -N/-S +E/.W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (usft) (usft) 8,922.44 5,907.60 6,900.00 5,272.12 1.58 0.00 -22.19 -3,862.93 -1,460.51 797.64 796.27 1.37 583.316 8,930.60 5,907.77 8,925.00 5,926.45 1.61 2.10 -112.54 -3,986.48 -1,020.46 31.07 28.25 2.82 11.021 8,955.19 5,908.35 6,875.00 5,253.99 1.72 0.00 -23.73 -3,845.88 -1,458.21 813.58 812.13 1.44 564.311 8,956.12 5,908.38 8,950.00 5,926.78 1.72 2.24 -118.30 -3,963.28 -1,011.15 28.09 25.25 2.84 9.893 8,981.23 5,909.07 8,975.00 5,927.25 1.83 2.40 -127.57 -3,940.37 -1,001.15 24.31 21.57 2.73 8.888 8,987.87 5,909.26 6,850.00 5,235.87 1.85 0.00 -25.23 -3,828.82 -1,455.81 829.23 827.72 1.51 547.371 9,005.99 5,909.83 9,000.00 5,927.78 1.93 2.56 -141.03 -3,917.46 -991.16 20.70 18.24 2.46 8.408 9,020.35 5,910.32 6,825.00 5,217.77 1.99 0.00 -26.69 -3,811.76 -1,453.30 844.63 843.04 1.59 532.581 9,030.58 5,910.68 9,025.00 5,928.32 2.03 2.73 -158.33 -3,894.26 -981.87 18.20 16.06 2.14 8.512 9,050.00 5,911.41 6,800.00 5,199.68 2.11 0.00 -27.94 -3,794.70 -1,450.68 859.78 858.13 1.65 521.103 9,055.02 5,911.61 9,050.00 5,928.85 2.14 2.89 -177.88 -3,870.78 -973.29 17.30 15.13 2.17 7.959 9,060.54 5,911.83 6,775.00 5,181.62 2.16 0.00 -26.51 -3,777.63 -1,448.00 874.96 873.27 1.69 518.400 9,070.32 5,912.24 6,750.00 5,163.58 2.20 0.00 -25.17 -3,760.53 -1,445.28 890.36 888.64 1.72 516.617 9,079.73 5,912.64 9,075.00 5,929.38 2.25 3.05 168.18 -3,847.06 -965.43 17.83 15.12 2.71 6.576 9,080.09 5,912.66 6,725.00 5,145.58 2.25 0.00 -23.85 -3,743.40 -1,442.52 905.97 904.21 1.76 515.288 9,100.00 5,913.55 6,650.00 5,091.76 2.34 0.00 -20.73 -3,691.86 .1,434.06 954.04 952.20 1.84 518.632 9,100.00 5,913.55 6,675.00 5,109.67 2.34 0.00 -21.30 -3,709.07 -1,436.90 937.77 935.94 1.83 513.570 9,100.00 5,913.55 6,700.00 5,127.61 2.34 0.00 -21.90 -3,726.25 -1,439.72 921.87 920.06 1.81 509.151 9,104.80 5,913.78 9,100.00 5,929.91 2.36 3.21 159.74 -3,823.10 -958.31 18.68 15.37 3.32 5.633 9,119.04 5,914.46 6,625.00 5,073.87 2.43 0.00 -18.93 -3,674.64 -1,431.20 970.33 968.43 1.90 511.766 9,128.74 5,914.95 6,600.00 5,056.00 2.48 0.00 -17.78 -3,657.39 -1,428.32 986.87 984.94 1.93 511.194 9,130.10 5,915.02 9,125.00 5,930.43 2.49 3.37 155.81 -3,798.94 -951.91 19.05 15.24 3.82 4.990 9,138.41 5,915.44 6,575.00 5,038.17 2.53 0.00 -16.65 -3,640.11 -1,425.43 1,003.56 1,001.60 1.96 510.869 9,150.00 5,916.05 6,525.00 5,002.63 2.59 0.00 -14.99 3,605.42 -1,419.59 1,037.44 1,035.43 2.01 515.683 9,150.00 5,916.05 6,550.00 5,020.38 2.59 0.00 -15.43 -3,622.79 -1,422.52 1,020.41 1,018.41 2.00 509.556 9,155.49 5,916.35 9,150.00 5,930.96 2.62 3.53 155.50 -3,774.59 -946.26 18.55 14.37 4.18 4.442 9,167.33 5,917.01 6,500.00 4,984.92 2.69 0.00 -13.43 -3,588.02 -1,416.65 1,054.51 1,052.44 2.07 509.583 9,176.91 5,917.55 6,475.00 4,967.23 2.74 0.00 -12.41 -3,570.61 .1,413.71 1,071.77 1,069.66 2.10 509.225 9,180.82 5,917.77 9,175.00 5,931.48 2.77 3.69 158.82 -3,750.09 -941.36 17.05 12.71 4.35 3.924 9,186.43 5,918.10 6,450.00 4,949.52 2.80 0.00 -11.42 -3,553.21 -1,410.77 1,089.20 1,087.06 2.14 509.100 9,200.00 5,918.91 6,400.00 4,914.05 2.88 0.00 -9.84 -3,518.46 -1,404.89 1,124.56 1,122.37 2.19 513.133 9,200.00 5,918.91 6,425.00 4,931.79 2.88 0.00 -10.18 -3,535.83 -1,407.83 1,106.80 1,104.62 2.19 506.377 9,205.95 5,919.28 9,200.00 5,931.99 2.91 3.84 167.15 -3,725.44 -937.20 14.69 10.52 4.17 3.522 9,214.59 5,919.81 6,375.00 4,896.26 2.97 0.00 -8.58 -3,501.14 -1,401.97 1,142.46 1,14022 225 508.858 9,223.79 5,920.39 6,350.00 4,878.40 3.03 0.00 -7.68 -3,483.89 -1,399.07 1,160.59 1,158.30 2.28 508.924 9,230.75 5,920.84 9,225.00 5,932.50 3.07 4.00 -175.60 -3,700.68 -933.80 12.06 8.68 3.38 3.570 9,232.88 5,920.98 6,325.00 4,860.46 3.08 0.00 -6.80 -3,466.72 -1,396.21 1,178.90 1,176.59 2.32 509.235 9,250.00 5,922.11 6,300.00 4,842.43 3.19 0.00 -5.41 -3,449.63 -1,393.37 1,197.45 1,195.07 2.38 503.815 9,255.09 5,922.45 9,250.00 5,933.01 3.23 4.16 -145.48 -3,675.82 -931.16 10.95 7.56 3.39 3.233 CC 9,263.13 5,922.98 6,275.00 4,824.37 3.28 0.00 3.00 -3,432.58 -1,390.52 1,216.04 1,213.61 2.43 500.922 9,279.38 5,923.98 9,275.00 5,933.51 3.39 4.31 -118.36 -3,650.90 -929.28 13.19 7.61 5.58 2.365 Caution Monitor Closely 9,304.02 5,925.38 9,300.00 5,934.12 3.55 4.47 -104.44 -3,625.98 -927.41 17.10 10.28 6.82 2.507 Normal Operabons 9,329.12 5,926.64 9,325.00 5,934.93 3.72 4.65 -99.16 .3,601.13 -924.82 20.58 13.14 7.44 2.767 Normal Operations 9,354.54 5,927.75 9,350.00 5,935.95 3.90 4.82 -98.01 -3,576.37 -921.49 23.01 15.18 7.82 2.941 Normal Operations 9,380.13 5,928.70 9,375.00 5,937.18 4.07 5.02 -99.40 -3,551.74 -917.44 24.20 16.10 8.10 2.987 Normal Operations 9,405.74 5,929.48 9,400.00 5,938.62 4.25 5.21 -102.89 -3,527.24 -912.67 24.14 15.86 8.28 2.915 Normal Operations 9,430.10 5,930.06 6,250.00 4,806.29 4.42 0.00 -16.63 .3,415.56 -1,387.60 1,233.59 1,230.61 2.98 414.097 9,431.24 5,930.08 9,425.00 5,94026 4.43 5.42 -108.77 -3,502.90 -907.18 22.90 14.58 8.32 2.753 Normal Operations 9,456.48 5,930.50 9,450.00 5,942.11 4.60 5.64 -118.10 -3,478.75 -900.98 20.75 12.68 8.07 2.572 Normal Operations 9,481.46 5,930.76 9,475.00 5,943.93 4.77 5.86 -130.84 -3,454.61 -894.77 18.61 11.20 7.42 2.509 Normal Operations 9,500.00 5,930.84 6,225.00 4,788.21 4.90 0.00 -20.93 -3,398.56 -1,384.62 1,249.49 1,246.30 3.19 391.666 9,506.20 5,930.85 9,500.00 5,945.48 4.95 6.08 -144.72 -3,430.28 -889.25 17.24 10.80 6.44 2.678 Normal Operations CC - Min centre to center distance or covergent point. SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27 37P Page 6 COMPASS 5000 14 Build 85H ConocoPhillips Company: ConocoPhillips Alaska Inc-Kuparuk Project: Kuparuk River Unit -2 Reference Site: Kuparuk 3H Pad Site Error: 0.00 usft Reference Well: 3H-01 Well Error: 0.00 usft Reference Wellbore 3H-01AL1 Reference Design: 3H-01AL1_wp01 ConocoPhillips Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3H-01 31-1-01 @ 76.00usft (3H-01) 31-1-01 @ 76.00usft (3H-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 3H-01 - 31-1-01A - 3H-01A_wp02 Offset she Error: 0.00 Usti Survey Program: 100 -BOSS -GYRO, 7700 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North -NI-S +EI -W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) 11 (usft) (usft) (usft) (ush) (usft) 9,517.29 5,930.87 6,200.00 4,770.11 5.03 0.00 -19.31 -3,381.59 -1,361.57 1,265.29 1,262.04 3.25 388.940 9,528.07 5,930.88 6,175.00 4,752.01 5.11 0.00 -18.16 -3,364.63 -1,378.46 1,281.25 1,277.95 3.30 388.698 9,530.76 5,930.89 9,525.00 5,946.78 5.13 6.30 -153.88 -3,405.78 -884.43 17.03 11.37 5.66 3.010 9,538.88 5,930.89 6,150.00 4,733.91 5.19 0.00 -17.03 -3,347.67 -1,375.30 1,297.32 1,293.98 3.34 388.556 9,550.00 5,930.91 6,125.00 4,715.82 5.27 0.00 -15.89 -3,330.72 -1,372.08 1,313.51 1,310.13 3.38 388.403 9,555.52 5,930.91 9,550.00 5,947.80 5.31 6.52 -156.05 -3,381.14 -880.31 17.50 12.16 5.34 3.275 9,560.60 5,930.91 6,100.00 4,697.73 5.35 0.00 -14.80 -3,313.77 -1,368.81 1,329.81 1,326.38 3.43 388.224 9,571.48 5,930.92 6,075.00 4,679.63 5.44 0.00 -13.71 -3,296.85 -1,365.52 1,346.24 1,342.77 3.47 388.026 9,580.36 5,930.92 9,575.00 5,948.57 5.51 6.75 -157.14 -3,356.39 -876.90 18.21 12.74 5.48 3.326 9,605.15 5,930.92 9,600.00 5,949.06 5.71 6.98 -151.69 -3,331.54 -874.20 19.08 13.03 6.05 3.154 9,629.76 5,930.90 9,625.00 5,949.29 5.93 7.21 -142.48 -3,306.62 -872.21 20.38 13.17 7.20 2.829 Normal Operations 9,654.17 5,930.87 9,650.00 5,949.37 6.14 7.44 -132.52 -3,281.71 -870.20 22.24 13.61 8.64 2.575 Normal Operations 9,678.48 5,930.83 9,675.00 5,949.40 6.36 7.69 -123.95 -3,256.86 -867.42 24.47 14.49 9.97 2.453 Caution Monitor Closely 9,702.70 5,930.78 9,700.00 5,949.40 6.58 7.93 -116.59 -3,232.11 -863.90 26.95 15.79 11.16 2.415 Caution Monitor Closely 9,726.81 5,930.71 9,725.00 5,949.35 6.82 8.19 -110.21 -3,207.48 -859.61 29.61 17.39 12.22 2.423 Caution Monitor Closely 9,750.83 5,930.64 9,750.00 5,949.27 7.05 8.45 -104.62 -3,183.00 -854.58 32.40 19.23 13.16 2.461 Caution Monitor Closely 9,774.75 5,930.55 9,775.00 5,949.15 7.29 8.73 -99.66 -3,158.67 -848.81 35.27 21.24 14.03 2.515 Normal Operations 9,798.58 5,930.45 9,800.00 5,948.98 7.53 9.00 -95.19 -3,134.54 -842.29 38.20 23.39 14.81 2.579 Normal Operations 9,824.41 5,930.32 9,825.00 5,948.78 7.80 9.28 -94.83 -3,110.62 -835.05 40.57 25.05 15.52 2.614 Normal Operations 9,850.54 5,930.19 9,850.00 5,948.53 8.07 9.56 -95.79 -3,086.92 -827.07 41.58 25.49 16.09 2.584 Normal Operations 9,876.71 5,930.03 9,875.00 5,948.25 8.35 9.85 -97.70 -3,063.49 -818.38 41.17 24.63 16.55 2.488 Caution Monitor Closely 9,902.77 5,929.87 9,900.00 5,947.93 8.63 10.14 -100.57 -3,040.32 -808.98 39.37 22.50 16.87 2.334 Caution Monitor Closely 9,928.57 5,929.69 9,925.00 5,947.57 8.90 10.44 -104.65 -3,017.46 -798.87 36.22 19.22 16.99 2.131 Caution Monitor Closely 9,953.95 5,929.50 9,950.00 5,947.17 9.18 10.73 -110.55 -2,994.92 -788.08 31.84 15.07 16.77 1.898 Caution Monitor Closely 9,978.79 5,929.30 9,975.00 5,946.73 9.45 11.04 -119.67 -2,972.72 -776.60 26.52 10.67 15.86 1.673 Caution Monitor Closely 10,002.87 5,929.10 10,000.00 5,946.26 9.71 11.34 -134.77 -2,950.87 -764.44 20.97 7.65 13.32 1.574 Caution Monitor Closely 10,026.16 5,928.90 10,025.00 5,945.75 9.97 11.65 -156.32 -2,929.41 -751.63 17.22 8.42 8.79 1.958 Caution Monitor Closely 10,049.91 5,928.70 10,050.00 5,945.26 10.23 11.96 178.99 -2,907.95 -738.82 17.11 7.69 9.42 1.816 Caution Monitor Closely 10,074.30 5,928.49 10,075.00 5,944.88 10.52 12.28 162.09 -2,886.11 -726.66 19.55 5.52 14.03 1.393 Take Immediate Action 10,099.21 5,928.28 10,100.00 5,944.58 10.81 12.60 153.18 -2,863.91 -715.17 22.55 5.44 17.11 1.318 Take Immediate Action 10,124.51 5,928.06 10,125.00 5,944.38 11.11 12.93 149.30 -2,841.38 -704.35 25.05 6.09 18.96 1.321 Take Immediate Action 10,150.06 5,927.84 10,150.00 5,944.27 11.42 13.26 148.61 -2,818.52 -694.23 26.58 6.51 20.07 1.325 Take Immediate Action 10,175.72 5,927.63 10,175.00 5,944.26 11.74 13.60 150.28 -2,795.36 -684.80 26.96 6.33 20.65 1.307 Take Immediate Action 10,201.31 5,927.41 10,200.00 5,944.42 12.06 13.93 154.14 -2,771.95 -676.06 26.32 5.66 20.66 1.274 Take Immediate Action 10,226.39 5,927.57 10,225.00 5,944.85 12.38 14.27 156.72 -2,748.29 -667.99 25.00 4.72 20.28 1.233 Take Immediate Action 10,251.48 5,928.40 10,250.00 5,945.53 12.70 14.61 159.64 -2,724.41 -660.61 23.26 3.54 19.72 1.180 Take immediate Action 10,276.55 5,929.89 10,275.00 5,946.48 13.03 14.95 163.21 -2,700.34 £53.92 21.13 2.25 18.87 1.119 Take Immediate Action 10,301.55 5,932.03 10,300.00 5,947.68 13.35 15.29 167.94 -2,676.10 -647.93 18.63 1.09 17.54 1.062 Take Immediate Action 10,325.82 5,934.08 10,325.00 5,949.15 13.67 15.63 175.43 -2,651.71 -642.64 16.52 1.44 15.08 1.095 Take Immediate Action 10,350.00 5,935.57 10,350.00 5,950.55 13.99 15.97 -173.73 -2,627.19 -638.03 15.32 3.46 11.86 1.292 Take Immediate Action 10,374.50 5,936.53 10,375.00 5,951.57 14.32 16.31 -160.88 -2,602.52 -634.06 15.05 4.52 10.54 1.429 Take Immediate Action 10,398.89 5,936.92 10,400.00 5,952.20 14.65 16.65 -147.92 -2,577.75 -630.75 15.90 2.51 13.39 1.188 Take Immediate Action 10,423.75 5,937.00 10,425.00 5,952.46 14.98 16.99 -137.39 -2,552.89 -628.09 17.56 -0.20 17.76 0.989 STOP Drilling 10,448.83 5,937.05 10,450.00 5,952.52 15.32 17.33 -130.96 -2,528.05 -625.38 19.25 -1.77 21.02 0.916 STOP Drilling 10,474.14 5,937.08 10,475.00 5,952.60 15.67 17.69 -129.21 -2,503.29 -621.91 20.28 -2.34 22.62 0.897 STOP Drilling 10,499.53 5,937.08 10,500.00 5,952.69 16.01 18.05 -131.03 -2,478.65 -617.69 20.39 -2.56 22.94 0.888 STOP Drilling 10,524.85 5,937.05 10,525.00 5,952.80 16.35 18.42 -136.38 -2,454.15 -612.71 19.58 -2.40 21.97 0.891 STOP Drilling 10,549.97 5,936.99 10,550.00 5,952.92 16.69 18.79 -146.16 -2,429.82 -606.99 18.11 -1.14 1925 0.941 STOP Drilling 10,574.73 5,936.91 10,575.00 5,953.05 17.03 19.17 -162.05 -2,405.67 -600.53 16.65 2.11 14.55 1.145 Take Immediate Action 10,599.01 5,936.80 10,600.00 5,953.19 17.36 19.55 175.41 -2,381.72 -593.34 16.50 3.55 12.95 1.274 Take Immediate Action 10,623.22 5,936.68 10,625.00 5,953.35 17.69 19.94 156.05 -2,358.01 -585.42 18.79 -1.06 19.86 0.946 STOP Drilling 10,647.64 5,936.56 10,650.00 5,953.52 18.03 20.33 142.86 -2,334.56 -576.78 22.97 -3.45 26.41 0.870 STOP Drilling CC - Min Centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27 37PM Page 7 COMPASS 5000 14 Build 85H 1W Kuparuk 3H Pad - 31-1-01 - 31-1-01 A - 3H-01A_Wp02 ConocoPhillips ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Project: Kuparuk River Unit -2 TVD Reference: Reference Site: Kuparuk 3H Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 31-1-01 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 3H-01AL1 Database: Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-01 - 31-1-01 A - 3H-01A_Wp02 Offset She Error: 0 00 usft Survey Program: 100 -BOSS -GYRO, 7700 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North +N1 -S +E/ -W Centres Ellipses Separation Factor (usft) (rift) (usft) (usft) (usft) (usft) ("I (usft) (usft) (usft) (usft) (usft) 10,672.26 5,936.44 10,675.00 5,953.70 18.38 2072. 134.72 -2,311.37 -567.42 28.21 -258 30.79 0.916 STOP Drilling 10,697.08 5,936.32 10,700.00 5,953.90 18.74 21.12 129.83 -2,288.49 -557.36 34.03 0.25 33.78 1.008 Take Immediate Action 10,722.12 5,936.20 10,725.00 5,954.10 19.12 21.52 126.95 -2,265.92 -546.61 40.18 4.20 35.99 1.117 Take Immediate Action 10,747.39 5,936.08 10,750.00 5,954.32 19.49 21.92 125.34 -2,243.69 -535.18 46.53 8.78 37.75 1.233 Take Immediate Action 10,772.88 5,935.95 10,775.00 5,954.55 19.88 22.32 124.59 -2,221.82 -523.07 52.99 13.75 39.23 1.351 Take Immediate Action 10,798.80 5,935.83 10,800.00 5,954.77 20.28 22.73 124.65 -2,199.95 -510.96 58.81 18.31 40.50 1.452 Take Immediate Action 10,825.25 5,935.70 10,825.00 5,954.97 20.70 23.14 125.45 -2,177.72 -499.52 63.21 21.61 41.60 1.519 Caution Monitor Closely 10,852.10 5,935.58 10,850.00 5,955.14 21.12 23.55 126.79 -2,155.16 -488.77 66.13 23.57 42.57 1.554 Caution Monitor Closely 10,879.17 5,935.45 10,875.00 5,955.28 21.55 23.97 128.55 -2,132.27 478.71 67.54 24.12 43.42 1.555 Caution Monitor Closely 10,906.31 5,935.33 10,900.00 5,955.39 21.98 24.39 130.69 -2,109.09 -469.35 67.42 23.26 44.16 1.527 Caution Monitor Closely 10,933.34 5,935.20 10,925.00 5,955.48 22.42 24.82 133.22 -2,085.63 -460.71 65.78 21.02 44.76 1.470 Take Immediate Action 10,960.11 5,935.08 10,950.00 5,955.53 22.85 25.24 136.20 -2,061.92 -452.79 62.64 17.46 45.18 1.386 Take Immediate Action 10,986.45 5,934.97 10,975.00 5,955.57 23.28 25.66 139.77 -2,037.98 -445.59 58.07 12.70 45.37 1.280 Take Immediate Action 11,010.86 5,934.86 11,000.00 5,955.57 23.67 26.09 142.50 -2,013.83 -439.13 52.30 6.91 45.39 1.152 Take Immediate Action 11,033.74 5,934.76 11,025.00 5,955.55 24.05 26.51 144.18 -1,989.50 -433.40 46.41 1.20 45.21 1.026 Take Immediate Action 11,056.78 5,934.66 11,050.00 5,955.49 24.43 26.94 146.79 -1,965.00 -428.42 40.65 -3.82 44.47 0.914 STOP Drilling 11,079.99 5,934.56 11,075.00 5,955.41 24.82 27.36 150.76 -1,940.36 -424.20 35.13 -7.68 42.81 0.821 STOP Drilling 11,103.37 5,934.46 11,100.00 5,955.31 25.21 27.78 156.72 -1,915.60 -420.72 30.00 -9.64 39.64 0.757 STOP Drilling 11,126.92 5,934.36 11,125.00 5,955.17 25.62 28.20 165.58 -1,890.75 -418.01 25.56 -8.52 34.08 0.750 STOP Drilling 11,150.84 5,934.26 11,150.00 5,955.01 26.03 28.62 176.41 -1,865.90 -415.29 22.54 -4.13 26.67 0.845 STOP Drilling 11,175.55 5,934.35 11,175.00 5,954.82 26.45 29.05 -173.64 -1,841.15 -411.82 20.90 0.19 20.71 1.009 Take Immediate Action 11,200.57 5,934.82 11,200.00 5,954.61 26.88 29.49 -166.37 -1,816.51 407.59 19.82 1.50 18.31 1.082 Take Immediate Action 11,225.78 5,935.69 11,225.00 5,954.37 27.32 29.93 -162.51 -1,792.01 -402.61 18.72 0.23 18.48 1.013 Take Immediate Action 11,251.04 5,936.94 11,250.00 5,954.10 27.76 30.38 -162.52 -1,767.68 -396.89 17.24 -1.67 18.91 0.912 STOP Drilling 11,276.21 5,938.58 11,275.00 5,953.81 28.19 30.83 -167.41 -1,743.53 -390.43 15.28 -3.53 18.81 0.812 STOP Drilling 11,301.16 5,940.57 11,300.00 5,953.50 28.62 31.29 -179.42 -1,719.59 -383.23 13.16 -8.55 21.71 0.606 STOP Drilling 11,325.95 5,942.73 11,325.00 5,953.15 29.06 31.75 164.80 -1,695.88 -375.30 11.78 -21.16 32.94 0.358 STOP Drilling 11,350.84 5,944.89 11,350.00 5,952.79 29.49 32.21 146.65 -1,672.43 -366.66 11.68 -35.29 46.96 0.249 STOP Drilling 11,375.82 5,947.05 11,375.00 5,952.40 29.94 32.68 130.22 -1,649.25 -357.31 12.90 -44.13 57.03 0.226 STOP Drilling, SF 11,400.90 5,949.22 11,400.00 5,951.98 30.39 33.15 117.96 -1,626.37 -347.25 15.13 -46.83 61.96 0.244 STOP Drilling, ES 11,426.07 5,951.39 11,425.00 5,951.54 30.84 33.62 109.67 -1,603.81 -336.49 18.00 -45.84 63.85 0.282 STOP Drilling 11,451.34 5,953.55 11,450.00 5,951.08 31.30 34.09 104.25 -1,581.58 -325.06 21.26 43.13 64.39 0.330 STOP Drilling 11,476.72 5,955.71 11,475.00 5,950.59 31.77 34.56 100.75 -1,559.71 -312.95 24.75 -39.67 64.42 0.384 STOP Drilling 11,502.20 5,957.87 11,500.00 5,950.09 32.23 35.03 98.55 -1,538.23 -300.18 28.37 -35.91 64.29 0.441 STOP Drilling 11,527.78 5,960.02 11,525.00 5,949.56 32.71 35.50 97.23 -1,517.15 -286.76 32.09 -32.03 64.12 0.500 STOP Drilling 11,553.46 5,962.15 11,550.00 5,949.01 33.18 35.97 96.54 -1,496.48 -272.70 35.85 -28.11 63.96 0.561 STOP Drilling 11,579.25 5,964.28 11,575.00 5,948.44 33.66 36.44 96.30 -1,476.26 -258.02 39.65 -24.17 63.82 0.621 STOP Drilling CC - Min centre to center distance or covergent point SF - min separation factor, ES - min ellipse separation 10/16/2019 127 37PM Page 8 COMPASS 5000.14 Build 85H Offset Design ConocoPhillips ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Well 31-1-01 Project: Kuparuk River Unit_2 TVD Reference: 31-1-01 @ 76.00usft (3H-01) Reference Site: Kuparuk 3H Pad MD Reference: 31-11-01 @ 76.00usft (31-1-01) Site Error: 0.00 usft North Reference: True Reference Well: 31-1-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 2.00 sigma Reference Wellbore 31-1-01AL1 Database: EDT 14 Alaska Production Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Offset Datum Offset Design Kuparuk 3H Pad - 31-1-05 - 31-1-05 - 31-1-05 Offset Site Error: 0 00 usft Survey Program: 100 -BOSS -GYRO Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North +NI -S 4E/.W Centres Ellipses Separation Factor (ush) (usft) (usft) (usft) (usft) (usft) (°) Juan) (us") (usft) (usft) (usft) 10,050.00 5,928.70 7,100.00 6,145.42 130.09 75.45 -88.40 -2,643.58 -1,744.18 1,057.72 853.91 203.81 5.190 10,050.00 5,928.70 7,125.00 6,165.70 130.09 76.62 -89.43 -2,656.69 -1,750.63 1,064.99 862.22 202.76 5.252 10,050.00 5,928.70 7,150.00 6,185.98 130.09 76.79 -90.44 -2,669.81 -1,757.08 1,072.79 871.16 201.63 5.321 10,050.00 5,928.70 7,155.00 6,190.04 130.09 76.82 -90.64 -2,672.43 -1,758.37 1,074.41 873.01 201.39 5.335 10,066.02 5,928.56 7,075.00 6,125.13 130.28 76.11 -86.23 -2,630.47 -1,737.73 1,050.72 846.22 204.50 5.138 10,072.44 5,928.50 7,050.00 6,104.85 130.36 75.77 -84.72 -2,617.35 -1,731.28 1,044.29 839.05 205.24 5.088 10,078.88 5,928.45 7,025.00 6,084.56 130.43 75.43 -83.19 -2,604.24 -1,724.84 1,038.33 832.42 205.91 5.043 10,085.33 5,928.39 7,000.00 6,064.28 130.51 75.09 -81.65 -2,591.13 -1,718.39 1,032.85 826.34 206.50 5.002 10,100.00 5,928.27 6,900.00 5,983.03 130.68 73.74 -76.17 -2,538.89 -1,692.51 1,015.86 807.79 208.07 4.882 10,100.00 5,92827 6,925.00 6,003.36 130.68 74.08 -77.30 -2,551.91 -1,699.00 1,019.30 811.48 207.82 4.905 10,100.00 5,928.27 6,950.00 6,023.68 130.68 74.41 -78.42 -2,564.95 -1,705.47 1,023.32 815.87 207.45 4.933 10,100.00 5,928.27 6,975.00 6,043.99 130.68 74.75 -79.52 -2,578.03 -1,711.93 1,027.92 820.95 206.97 4.967 10,117.75 5,928.12 6,875.00 5,962.69 130.90 73.40 -73.78 -2,525.88 -1,686.02 1,012.66 804.40 208.26 4.863 10,124.27 5,928.06 6,850.00 5,942.36 130.97 73.06 -72.18 -2,512.87 -1,679.50 1,010.10 801.75 208.35 4.848 10,130.81 5,928.01 6,825.00 5,922.03 131.05 72.73 -70.57 -2,499.87 -1,672.97 1,008.03 799.69 208.34 4.838 10,150.00 5,927.84 6,700.00 5,820.35 131.29 71.04 -63.44 -2,434.97 -1,640.19 1,005.65 798.92 206.73 4.864 10,150.00 5,927.84 6,725.00 5,840.70 131.29 71.38 -64.60 -2,447.93 -1,646.74 1,004.96 797.65 207.31 4.848 10,150.00 5,927.84 6,750.00 5,861.04 131.29 71.72 -65.76 -2,460.90 -1,653.29 1,004.90 797.13 207.77 4.837 CC, ES 10,150.00 5,927.84 6,775.00 5,881.38 131.29 7205 -66.91 -2,473.89 -1,659.85 1,005.46 797.35 208.11 4.831 SF 10,150.00 5,927.84 6,800.00 5,901.70 131.29 72.39 -68.07 -2,486.88 -1,666.41 1,006.65 798.33 208.32 4.832 10,170.23 5,927.67 6,675.00 5,800.00 131.54 70.70 -60.86 -2,422.00 -1,633.66 1,006.52 800.14 206.38 4.877 10,176.83 5,927.62 6,650.00 5,779.65 131.62 70.37 -59.25 -2,409.02 -1,627.15 1,008.15 802.42 205.73 4.900 10,183.44 5,927.56 6,625.00 5,759.31 131.70 70.03 -57.64 -2,396.01 -1,620.67 1,010.33 805.34 204.99 4.929 10,200.00 5,927.42 6,575.00 5,718.62 131.90 69.36 -54.21 -2,369.96 -1,607.78 1,016.32 812.99 203.33 4.998 10,200.00 5,927.42 6,600.00 5,738.97 131.90 69.70 -55.33 -2,382.99 -1,614.22 1,013.17 808.81 204.36 4.958 10,211.54 5,927.40 6,550.00 5,698.28 132.05 69.02 -53.49 -2,356.95 -1,601.32 1,020.02 817.56 202.46 5.038 10,233.48 5,927.74 6,525.00 5,677.93 132.33 68.69 -53.11 -2,343.95 -1,594.86 1,024.03 822.30 201.74 5.076 10,253.95 5,928.52 6,500.00 5,657.57 132.58 68.35 -52.66 -2,330.96 -1,588.39 1,028.34 827.46 200.89 5.119 10,613.99 5,936.73 6,475.00 5,637.23 137.46 68.01 -70.23 -2,317.96 -1,581.90 1,032.87 836.78 196.09 5.267 10,620.09 5,936.70 6,450.00 5,616.91 137.55 67.68 -68.63 -2,304.93 -1,575.37 1,033.40 838.06 195.34 5.290 10,626.25 5,936.67 6,425.00 5,596.62 137.64 67.34 -67.03 -2,291.88 -1,568.81 1,034.42 839.92 194.50 5.318 10,632.46 5,936.64 6,400.00 5,576.36 137.72 67.00 -65.44 -2,278.80 -1,562.22 1,035.91 842.34 193.58 5.351 10,650.00 5,936.55 6,300.00 5,495.43 137.97 65.64 -59.65 -2,226.38 -1,535.73 1,046.98 857.65 189.33 5.530 10,650.00 5,936.55 6,325.00 5,515.65 137.97 65.98 -60.77 -2,239.49 -1,542.36 1,043.41 853.03 190.38 5.481 10,650.00 5,936.55 6,350.00 5,535.88 137.97 66.32 -61.91 -2,252.60 -1,548.98 1,040.43 849.09 191.34 5.438 10,650.00 5,936.55 6,375.00 5,556.12 137.97 66.66 -63.05 -2,265.71 -1,555.60 1,038.04 845.84 192.20 5.401 10,664.18 5,936.48 6,275.00 5,475.21 138.18 65.30 -57.53 -2,213.26 -1,529.09 1,050.90 863.07 187.83 5.595 10,670.63 5,936.45 6,250.00 5,454.98 138.27 64.95 -55.97 -2,200.17 -1,522.42 1,055.36 868.89 186.47 5.660 10,677.12 5,936.42 6,225.00 5,434.75 138.37 64.61 -54.43 -2,187.09 -1,515.73 1,060.28 875.22 185.06 5.729 10,683.63 5,936.39 6,200.00 5,414.52 138.46 64.27 -52.89 -2,174.03 -1,509.01 1,065.65 882.07 183.58 5.805 10,700.00 5,936.31 6,100.00 5,333.51 138.70 62.91 -47.54 -2,122.07 -1,481.85 1,091.66 914.33 177.33 6.156 10,700.00 5,936.31 6,125.00 5,353.78 138.70 63.25 -48.57 -2,135.02 -1,488.68 1,084.45 905.54 178.91 6.062 10,700.00 5,936.31 6,150.00 5,374.04 138.70 63.59 -49.61 -2,147.99 -1,495.48 1,077.75 897.33 180.42 5.974 10,700.00 5,936.31 6,175.00 5,394.28 138.70 63.93 -50.66 -2,161.00 -1,502.26 1,071.57 889.71 181.87 5.892 10,716.57 5,936.23 6,075.00 5,313.23 138.95 62.57 -45.37 -2,109.16 -1,475.01 1,099.12 923.62 175.50 6.263 10,723.23 5,936.19 6,050.00 5,292.93 139.05 62.24 -43.91 -2,096.27 -1,468.16 1,107.11 933.35 173.77 6.371 10,729.90 5,936.16 6,025.00 5,272.61 139.15 61.90 -42.47 -2,083.41 -1,461.32 1,115.53 943.52 172.01 6.485 10,736.60 5,936.13 6,000.00 5,252.27 139.25 61.56 -41.04 -2,070.58 -1,454.48 1,124.37 954.14 170.23 6.605 10,750.00 5,936.06 5,925.00 5,191.19 139.46 60.56 -37.33 -2,032.27 -1,433.86 1,153.22 988.42 164.80 6.998 10,750.00 5,936.06 5,950.00 5,211.56 139.46 60.89 -38.23 -2,045.01 -1,440.75 1,143.21 976.59 166.62 6.861 10,750.00 5,936.06 5,975.00 5,231.92 139.46 61.23 -39.16 -2,057.79 -1,447.63 1,133.64 965.25 168.39 6.732 10,763.58 5,936.00 5,900.00 5,170.81 139.67 60.22 -35.49 -2,019.55 -1,426.94 1,163.51 1,000.55 162.96 7.140 CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 1:27:37PM Page 9 COMPASS 5000 14 Build 85H Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-05 - 31-1-05 - 31-1-05 ConocoPhillips r- ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Project: Kuparuk River Unit_2 ND Reference: Reference Site: Kuparuk 3H Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 31-1-01 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 3H-01AL1 Database: Reference Design: 3H-01AL1_wp01 Offset ND Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-05 - 31-1-05 - 31-1-05 Offset Site Error: 0.00 usft Survey Program: 100 -BOSS -GYRO Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North -NIS +E/ -W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) 11) (usft) (usft) (usft) (usft) (usft) 10,770.36 5,935.97 5,875.00 5,150.41 139.77 59.89 -34.14 -2,006.86 -1,420.00 1,174.18 1,013.06 161.12 7.288 10,777.19 5,935.93 5,850.00 5,130.01 139.88 59.55 -32.81 -1,994.21 -1,413.03 1,185.18 1,025.91 159.27 7.441 10,784.01 5,935.90 5,825.00 5,109.59 139.98 59.22 -31.50 -1,981.60 -1,406.03 1,196.51 1,039.08 157.43 7.600 10,800.00 5,935.82 5,725.00 5,027.68 14023 57.88 -27.23 -1,931.30 -1,377.86 1,245.02 1,095.01 150.02 8.299 10,800.00 5,935.82 5,750.00 5,048.29 140.23 58.22 -27.99 -1,943.90 -1,384.91 1,232.38 1,080.48 151.90 8.113 10,800.00 5,935.82 5,775.00 5,068.72 140.23 58.55 -28.77 -1,956.47 -1,391.95 1,220.10 1,066.34 153.77 7.935 10,800.00 5,935.82 5,800.00 5,089.15 140.23 58.88 -29.56 -1,969.03 -1,399.00 1,208.22 1,052.58 155.64 7.763 10,81852 5,935.74 5,700.00 5,007.47 140.52 57.55 -25.20 -1,918.69 -1,370.81 1,257.76 1,109.42 146.34 8.479 10,825.51 5,935.70 5,675.00 4,987.07 140.63 57.22 -23.99 -1,906.08 -1,363.78 1,270.90 1,124.32 146.58 8.671 10,832.52 5,935.67 5,650.00 4,966.65 140.74 56.89 -22.80 -1,893.48 -1,356.76 1,284.33 1,139.50 144.83 8.868 10,850.00 5,935.59 5,550.00 4,884.80 141.01 55.56 -18.96 -1,843.32 -1,328.75 1,340.83 1,202.97 137.86 9.726 10,850.00 5,935.59 5,575.00 4,905.28 141.01 55.89 -19.59 -1,855.80 -1,335.80 1,326.30 1,186.65 139.65 9.497 10,850.00 5,935.59 5,600.00 4,925.75 141.01 56.22 -20.24 -1,868.33 -1,342.79 1,312.06 1,170.61 141.45 9.276 10,850.00 5,935.59 5,625.00 4,946.21 141.01 56.55 -20.89 -1,880.90 -1,349.76 1,298.14 1,154.88 143.26 9.061 CC - Min centre to center distance or covergent point SF - min separation factor, ES - min ellipse separation 10/162019 1 27 37PM Page 10 COMPASS 5000 14 Build 85H Offset Design Kuparuk 3H Pad - 3H-26 - 3H-261-1 - 3H-261-1 ConocoPhillips `. ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Well 3H-01 Project: Kuparuk River Unit_2 ND Reference: 3H-01 @ 76.00usft (3H-01) Reference Site: Kuparuk 3H Pad MD Reference: 3H-01 @ 76.00usft (3H-01) Site Error: 0.00 usft North Reference: True Reference Well: 3H-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 2.00 sigma Reference Wellbore 3H-01AL1 Database: EDT 14 Alaska Production Reference Design: 3H-01AL1_wpol Offset ND Reference: Offset Datum Offset Design Kuparuk 3H Pad - 3H-26 - 3H-261-1 - 3H-261-1 Offset Site Error: 0 00 Usti Survey Program: 121 -MWD OWSG, 6230 -MWD -INC -ONLY, 6350 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North +N/ -S +Et -W centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft( (°) (usft) (usft) (usft) (usft) (usft) 9,746.44 5,930.65 8,773.00 5,900.91 126.85 106.00 106.97 -3,403.91 -267.20 601.99 374.30 227.69 2.644 Normal Operations 9,800.00 5,930.44 8,750.00 5,900.76 127.39 105.43 110.71 -3,381.68 -261.32 598.88 372.82 226.06 2.649 Normal Operations 9,819.25 5,930.35 8,725.00 5,900.60 127.58 104.82 109.33 -3,357.51 -254.93 595.26 369.17 226.08 2.633 Normal Operations 9,833.65 5,930.28 8,700.00 5,901.12 127.73 104.21 108.37 -3,33341 -248.31 592.30 365.98 226.32 2.617 Normal Operations 9,850.00 5,930.19 8,675.00 5,902.44 127.90 103.61 107.35 -3,309.52 -241.07 590.39 363.94 226.45 2.607 Normal Operations 9,862.63 5,930.12 8,650.00 5,903.36 128.03 103.03 106.55 -3,285.71 -233.52 589.27 362.61 226.66 2.600 Normal Operations 9,877.18 5,930.03 8,625.00 5,903.31 128.19 102.46 105.54 -3,261.90 -225.88 588.72 361.99 226.73 2.597 Normal Operations 9,900.00 5,929.89 8,575.00 5,904.17 128.43 101.37 104.06 -3,215.07 -208.41 591.28 364.50 226.78 2.607 Normal Operations 9,900.00 5,929.89 8,600.00 5,903.56 128.43 101.90 103.97 -3,238.34 -217.53 589.44 362.87 226.57 2.602 Normal Operations 9,920.60 5,929.75 8,550.00 5,904.49 128.65 100.86 102.67 -3,192.13 -198.49 594.41 367.77 226.64 2.623 Normal Operations 9,934.84 5,92964 8,525.00 5,904.15 128.81 100.37 101.67 -3,16953 -18781 598.89 372.38 226.51 2.644 Normal Operations 9,950.00 5,929.53 8,500.00 5,903.09 128.97 99.91 100.54 -3,147.24 -176.53 604.47 378.15 226.32 2.671 Normal Operations 9,962.79 5,929.43 8,475.00 5,902.11 129.11 99.46 99.60 -3,125.10 -164.97 610.77 384.69 226.09 2.702 Normal Operations 9,976.47 5,929.32 8,450.00 5,900.65 129.26 99.03 98.55 -3,103.18 -153.04 617.93 392.13 225.80 2.737 Normal Operations 10,000.00 5,929.13 8,425.00 5,898.74 129.53 98.62 96.77 -3,081.65 -140.48 626.32 400.64 225.68 2.775 Norval Operations 10,022.80 5,928.93 8,400.00 5,897.36 129.78 98.25 98.32 -3,060.73 -126.88 635.84 410.25 225.59 2.819 Normal Operations 10,129.56 5,928.02 8,375.00 5,897.38 131.04 97.91 105.92 -3,040.54 -112.14 644.74 419.33 225.40 2.860 Normal Operations 10,200.00 5,92742 8,350.00 5,897.83 131.90 97.60 110.98 -3,020.67 -96.97 651.21 427.27 223.94 2.908 Normal Operations 10,223.37 5,927.52 8,325.00 5,897.35 132.20 97.29 110.13 -3,000.86 -81.73 657.30 433.31 224.00 2.934 Norval Operations 10,240.04 5,927.94 8,300.00 5,897.12 132.41 97.00 109.52 -2,981.41 -66,04 664.26 439.93 224.32 2.961 Normal Operations 10,250.00 5,928.33 8,275.00 5,897.27 132.53 96.73 109.15 -2,962.27 -49.95 671.99 447.13 224.85 2.989 Normal Operations 10,272.93 5,929.63 8,250.00 5,897.04 132.83 96.44 108.28 -2,942.76 -34.33 679.34 454.42 224.92 3.020 10,289.53 5,930.92 8,225.00 5,895.90 133.04 96.10 107.51 -2,922.04 -20.40 685.04 459.90 225.14 3.043 10,300.00 5,931.88 8,200.00 5,894.34 133.18 95.73 106.88 -2,900.36 -8.06 689.27 463.82 225.44 3.057 10,322.38 5,933.82 8,175.00 5,892.73 133.47 95.32 105.67 -2,878.19 3.37 692.71 467.27 225.44 3.073 10,338.81 5,934.95 8,150.00 5,891.10 133,69 94.89 104.72 -2,855.60 13.94 695.55 470.02 225.53 3.084 10,350.00 5,935.57 8,125.00 5,889.82 133.84 94.43 104.04 -2,832.54 23.51 697.60 471.97 225.63 3.092 10,372.01 5,936.46 8,100.00 5,889.01 134.13 93.94 102.96 -2,809.02 31.95 698.65 473.06 225.60 3.097 10,388.71 5,936.83 6,075.00 5,888.53 134.36 93.41 102.14 -2,785.12 39.25 698.80 473.22 225.58 3.098 10,400.00 5,936.93 8,050.00 5,888.31 134.51 92.85 101.6o -2,760.87 45.32 697.99 472.47 225.52 3.095 10,417.86 5,936.99 8,025.00 5,887.69 134.75 92.26 100.29 -2,736.27 49.69 695.81 470.41 225.40 3.087 10,431.29 5,937.02 8,000.00 5,886.70 134.94 91.62 99.24 -2,711.46 52.57 692,60 467.43 225.18 3.076 10,450.00 5,937.06 7,950.00 5,884.47 135.19 90.26 97.68 -2,661.58 54.84 684.06 459.74 224.32 3.049 10,450.00 5,937.06 7,975.00 5,885.55 135.19 90.95 97.81 -2,686.54 54.24 688.65 463.69 224.96 3.061 10,471.44 5,937.08 7,925.00 5,883.58 135.49 89.55 96.07 -2,63660 54.45 678.76 454.67 224.08 3.029 10,484.80 5,937.08 7,900.00 5,882.60 135.67 88.83 95.01 -2,611.64 53.30 673.20 449.61 223.59 3.011 10,500.00 5,937.08 7,875.00 5,881.85 135.88 88.09 93.84 -2,586.74 51.23 667.12 444.02 223.10 2.990 Normal Operations 10,511.59 5,937.07 7,850.00 5,881.99 136.04 87.35 92.99 -2,561.86 48.81 661.02 438.58 222.44 2.972 Normal Operations 10,525.05 5,937.05 7,825.00 5,882.65 136.23 86.60 92.06 -2,537.06 45.78 654.68 432.89 221.79 2.952 Normal Operations 10,538.50 5,937.02 7,800.00 5,883.29 136.41 85.84 91.13 -2,512.36 41.95 647.95 426.86 221.09 2.931 Normal Operations 10,550.00 5,936.99 7,775.00 5,884.00 136.57 85.07 90.34 -2,487.78 37.46 640.98 420.78 220.20 2.911 Normal Operations 10,565.39 5,936.94 7,750.00 5,885.49 136.79 84.30 89.34 -2,463.45 31.91 633.29 413.77 219.52 2.885 Normal Operations 10,578.80 5,936.89 7,725.00 5,887,21 136.97 83.52 88.50 -2,439.31 25.64 625.26 406.60 218.66 2.859 Normal Operations 10,600.00 5,936.80 7,700.00 5,888.23 137.27 82.74 87.04 -2,415.60 17.83 616.27 397.90 218.36 2.822 Normal Operations 10,635.06 5,936.63 7,675.00 5,889.10 137.76 81.96 89.52 -2,392.25 8.92 606.18 387.02 219.16 2.766 Normal Operations 10,715.66 5,936.23 7,650.00 5,890.21 138.94 81.18 95.20 -2,369.15 -0.56 593.80 371.25 222.55 2.668 Normal Operations 10,785.46 5,935.89 7,625.00 5,891.15 140.00 80.41 100.09 -2,346.40 -10.88 578.76 354.74 224.02 2.584 Normal Operations 10,845.13 5,935.61 7,600.00 5,892.49 140.94 79.65 104.28 -2,323.96 -21.82 561.66 337.47 224.19 2.505 Normal Operations 10,895.31 5,935.38 7,575.00 5,893.21 141.73 78.90 107.73 -2,301.89 -33.54 542.84 319.30 223.54 2.428 Caution Monitor Closely 10,937.46 5,935.18 7,550.00 5,893.69 142.40 78.16 110.57 -2,280.15 -45.87 522.74 300.30 222.44 2.350 Caution Monitor Closely 10,973.14 5,935.02 7,525.00 5,894.56 142.97 77.43 112.97 -2,258.65 -58.60 501.68 280.56 221.12 2.269 Caution Monitor Closely 11,000,00 5,934.91 7,475.00 5,895.58 143.40 76.04 114.51 -2,216.88 -86.02 457.48 236.64 220.84 2.072 Caution Monitor Closely CC - Min centre to center distance or covergent point. SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27 3 7P Page 11 COMPASS 5000 14 Build 85H 1W ConocoPhillips ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc-Kuparuk Local Co-ordinate Reference: Well 31-1-01 Project: Kuparuk River Unit_2 TVD Reference: 3H-01 @ 76.00usft (3H-01) Reference Site: Kuparuk 3H Pad MD Reference: 31-1-01 @ 76.00usft (31-1-01) Site Error: 0.00 usft North Reference: True Reference Well: 31-1-01 Survey Calculation Method: Minimum Curvature Well Error: 0.00 usft Output errors are at 2.00 sigma Reference Wellbore 31-1-01AL1 Database: EDT 14 Alaska Production Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Offset Datum Offset Design Kuparuk 3H Pad - 31-1-26 - 31-1-261-1 - 31-1-261-1 Offset Site Error: 0.00 usft Survey Program: 121 -MWD OWSG, 6230 -MWD -INC ONLY, 6350 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North +WS +Ef-W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) (°) (usft) (usft) (usft) (waft) (usft) 11,000.00 5,934.91 7,500.00 5,895.52 143.40 76.73 114.75 -2,237.53 -71.93 479.75 259.76 219.99 2.181 Caution Monitor Closely 11,015.40 5,934.84 7,450.00 5,895.30 143.65 75.35 113.12 -2,195.84 -99.51 435.48 214.95 220.52 1.975 Caution Monitor Closely 11,023.80 5,934.80 7,425.00 5,894.55 143.79 74.67 112.14 -2,174.38 -112.31 414.16 193.40 220.76 1.876 Caution Monitor Closely 11,032.63 5,934.77 7,400.00 5,893.77 143.94 73.99 111.08 -2,152.79 -124.90 393.13 172.12 221.01 1-779 Caution Monitor Closely 11,050.00 5,934.69 7,350.00 5,895,63 144.22 72.65 109.44 -2,107.88 -146.68 353.44 131.48 221.96 1.592 Caution Monitor Closely 11,050.00 5,934.69 7,375.00 5,894.07 144.22 73.32 109.55 -2,130.66 -136.49 372.89 152.22 220.67 1.690 Caution Monitor Closely 11,064.98 5,934.62 7,325.00 5,897.32 144.47 71.98 108.30 -2,084.93 -156.43 334.57 112.47 222.10 1.506 Caution Monitor Closely 11,077.22 5,934.57 7,300.00 5,898.94 144.67 71.32 107.33 -2,061.77 -165.72 316.31 93.83 222.48 1.422 Take Immediate Action 11,090.22 5,934.52 7,275.00 5,900.43 144.89 70.67 106.30 -2,038.36 -174.35 298.82 75.99 222.82 1.341 Take Immediate Action 11,100.00 5,934.47 7,250.00 5,901.64 145.05 70.02 105.44 -2,014.78 -182.57 282.00 58.71 223.29 1.263 Take Immediate Action 11,118.24 5,934.39 7,225.00 5,902.60 145.36 69.38 103.92 -1,990.99 -190.20 265.93 42.59 223.34 1.191 Take Immediate Action 11,133.34 5,934.33 7,200.00 5,903.47 145.62 68.75 102.61 -1,967.02 -197.23 250.73 27.23 223.51 1.122 Take Immediate Action 11,150.00 5,934.26 7,175.00 5,904.25 145.90 68.13 101.15 -1,942.98 -204.06 236.11 12.53 223.58 1.056 Take Immediate Action 11,165.37 5,934.27 7,150.00 5,904.57 146.17 67.51 99.78 -1,918.86 -210.61 222.16 -1.36 223.53 0.994 STOP Drilling 11,182.45 5,934.44 7,125.00 5,904.74 146.46 66.91 98.20 -1,894.57 -216.51 209.22 -14.11 223.32 0.937 STOP Drilling 11,200.00 5,934.81 7,100.00 5,905.11 146.76 66.31 96.59 -1,870.00 -221.10 197.85 -25.16 223.01 0.887 STOP Drilling 11,219.25 5,935.43 7,075.00 5,906.21 147.10 65.73 95.06 -1,845.23 -22428 188.13 -34.62 222.74 0.845 STOP Drilling 11,238.77 5,936.28 7,050.00 5,908.10 147.44 65.16 93.74 -1,820.37 -226.08 180.07 -42.43 222.50 0.809 STOP Drilling 11,258.88 5,937.41 7,025.00 5,910.19 147.79 64.60 92.47 -1,795.46 -226.49 173.85 -46.35 222.20 0.782 STOP Drilling 11,279.29 5,938.80 7,000.00 5,912.45 148.14 64.06 91.19 -1,770.57 -226.46 168.60 -53.20 221.80 0.760 STOP Drilling 11,300.06 5,940.48 6,975.00 5,915.97 148.50 63.54 90.35 -1,745.87 -224.93 165.19 -56.41 221.60 0.745 STOP Drilling 11,330.92 5,943.16 6,950.00 5,920.69 149.04 63.04 93.09 -1,721.48 -222.23 162.61 -60.77 223.38 0.728 STOP Drilling 11,361.67 5,945.83 6,924.91 5,925.98 149.59 62.55 96.03 -1,697.16 -218.98 159.60 -65.36 224.96 0.709 STOP Drilling 11,391.86 5,948.44 6,900.00 5,931.29 150.13 62.07 98.93 -1,673.02 -215.94 155.56 -70.63 226.19 0.688 STOP Drilling 11 421.62 5,951.01 6,875.00 5,936.62 150.67 61.59 101.80 -1,648.71 -213.55 150.02 -77.07 227.09 0.661 STOP Drilling 11,450.66 5,953.49 6,850.00 5,941.69 151.19 61.10 104.54 -1,624.29 -211.93 142.91 -84.71 227.63 0.628 STOP Drilling 11,478.81 5,955.69 6,825.00 5,946.21 151.71 60.61 107.02 -1,599.71 -211.11 134.29 -93.52 227.81 0.589 STOP Drilling 11,505.86 5,958.18 6,800.00 5,950.21 152.20 60.12 109.23 -1,575.04 -211.20 124.08 -103.61 227.68 0.545 STOP Drilling 11,531.71 5,960.35 6,775.00 5,953.74 152.67 59.64 111.17 -1,550.30 -212.09 112.45 -114.85 227.30 0.495 STOP Drilling 11,5W39 5,962.40 6,750.00 5,957.10 153.12 59.15 112.96 -1,525.57 -213.52 99.68 -127.05 226.73 0.440 STOP Drilling 11,579.96 5,964.34 6,725.00 5,960.86 153.56 58.68 114.98 -1,500.92 -215.29 85.99 -140.10 226.08 0.380 STOP Drilling, CC, ES, SF CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27:37PM Page 12 COMPASS 5000 14 Build 85H IW ConocoPhillips Company: ConocoPhillips Alaska Inc-Kuparuk Project: Kuparuk River Unit _2 Reference Site: Kuparuk 3H Pad Site Error: 0.00 usft Reference Well: 31-1-01 Well Error: 0.00 usft Reference Wellbore 3H-01AL1 Reference Design: 3H-01AL1_wp01 ConocoPhillips Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-26 - 31-1-261-1-01 - 31-1-261-1-01 Offset Site Error: 0.00 usft Survey Program: 121 -MWD OWSG, 6230 -MWD -INC ONLY, 6350 -MWD OWSG, 6772 -MWD -INC -ONLY, 6890 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North -NIS +E/ -W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (usft) (usft) 11) (usft) (usft) (usft) (usft) (usft) 9,461.06 5,930.56 8,890.00 5,841.52 124.38 102.33 87.31 -3,537.01 -246.88 646.18 425.34 220.84 2.926 Normal Operations 9,468.45 5,930.65 8,875.00 5,845.34 124.44 102.07 87.22 -3,524.85 -238.96 652.35 431.72 220.63 2.957 Normal Operations 9,480.62 5,930.75 8,850.00 5,851.71 124.53 101.64 87.06 -3,504.57 -225.80 662.90 442.67 220.23 3.010 9,500.00 5,930.84 8,825.00 5,858.07 124.68 101.19 86.39 -3,483.96 -213.15 673.38 453.23 220.15 3.059 9,551.68 5,930.91 8,800.00 5,864.32 125.09 100.74 90.62 -3,462.94 -201.15 683.16 461.59 221.57 3.083 9,693.55 5,930.80 8,775.00 5,870.36 126.35 100.26 101.12 -3,441.47 -189.87 689.32 465.79 223.53 3.084 9,800.00 5,930.44 8,750.00 5,875.99 127.39 99.73 109.07 -3,418.85 -180.90 688.98 467.51 221.47 3.111 9,817.25 5,930.36 8,725.00 5,881.04 127.56 99.21 108.27 -3,396.02 -172.11 687.63 465.97 221.66 3.102 9,830.61 5,930.29 8,700.00 5,885.35 127.70 98.71 107.71 -3,373.93 -161.25 688.98 467.02 221.97 3.104 9,850.00 5,930.19 8,650.00 5,890.23 127.90 97.73 106.80 -3,329.14 -139.63 692.98 470.46 222.52 3.114 9,850.00 5,930.19 8,675.00 5,888.53 127.90 98.22 106.64 -3,351.66 -150.35 690.86 468.83 222.03 3.112 9,870.95 5,930.07 8,625.00 5,891.14 128.12 97.24 105.43 -3,306.70 -128.64 695.73 473.27 222.45 3.127 9,884.36 5,929.99 8,600.00 5,891.15 128.26 96.75 104.51 -3,264.19 -117.78 698.87 476.38 22249 3.141 9,900.00 5,929.89 8,550.00 5,893.34 128.43 95.78 103.65 -3,239.15 -96.21 706.24 483.79 222.45 3.175 9,900.00 5,929.89 8,575.00 5,891.69 128.43 96.27 103.48 -3,261.65 -106.99 702.31 479.84 222.47 3.157 9,924.18 5,929.72 8,525.00 5,895.01 128.69 95.30 102.11 -3,216.50 -85.76 709.90 487.57 222.34 3.193 9,937.36 5,929.62 8,500.00 5,897.22 128.83 94.80 101.39 -3,193.64 -75.89 713.49 491.30 222.18 3.211 9,950.00 5,929.53 8,475.00 5,899.08 128.97 94.29 100.68 .3,170.50 -66.63 716.83 494.87 221.96 3.229 9,963.73 5,929.42 8,450.00 5,90073 129.12 93.77 99.87 -3,14208 -58.03 719.88 498.18 221.70 3.247 9,976.92 5,929.32 8,425.00 5,901.89 129.27 93.23 99.05 -3,123.42 -50.03 722.72 501.36 221.36 3.265 10,000.00 5,929.13 8,400.00 5,902.45 129.53 92.69 97.49 -3,099.60 42.48 725.64 504.45 221.19 3.281 10,055.37 5,928.65 8,375.00 5,903.01 130.16 92.14 101.47 -3,075.69 -35.19 728.21 506.67 221.54 3.287 10,200.00 5,927.42 8,350.00 5,90340 131.90 91.59 111.73 -3,051.71 -28.15 726.36 506.22 220.14 3.300 10,222.78 5,927.51 8,325.00 5,903.81 132.19 91.03 110.94 -3,027.57 -21.65 722.69 502.55 220.14 3.283 10,239.57 5,927.92 8,300.00 5,904.08 132.40 90.46 110.33 -3,003.29 -15.72 718.74 498.43 220.31 3.262 10,250.00 5,928.33 8,275.00 5,904.75 132.53 89.89 109.93 -2,978.95 -10.06 714.82 494.21 220.62 3.240 10,273.21 5,929.65 8,250.00 5,905.99 132.83 89.30 109.13 -2,954.53 -4.85 710.62 490.03 220.59 3.221 10,289.92 5,930.95 8,225.00 5,907.03 133.05 88.70 108.50 -2,929.87 -0.86 705.52 484.84 220.68 3.197 10,300.00 5,931.88 8,200.00 5,907.89 133.18 88.09 108.04 -2,905.10 2.36 699.98 479.14 220.84 3.170 10,322.25 5,933.81 8,175.00 5,908.97 133.47 87.47 107.03 -2,880.25 4.87 693.93 473.14 220.79 3.143 10,338.33 5,934.92 8,150.00 5,910.30 133.68 86.85 106.31 -2,855.42 7.45 688.28 467.47 220.81 3.117 10,350.00 5,935.57 8,125.00 5,911.40 133.84 86.24 105.77 -2,830.62 10.40 683.32 462.50 220.83 3.094 10,370.88 5,936.42 8,100.00 5,911.56 134.12 85.63 104.80 -2,805.82 13.56 678.85 458.07 220.78 3.075 10,387.28 5,936.81 8,075.00 5,910.65 134.34 85.03 103.94 -2,781.05 16.77 674.81 454.08 220,72 3.057 10,400.00 5,936.93 8,050.00 5,909.34 134.51 84.44 103.23 -2,756.34 20.37 671.49 450.89 220.60 3.044 10,416.77 5,936.98 8,025.00 5,907.58 134.74 83.86 101.89 -2,731.72 24.30 668.89 448.42 220.47 3.034 10430.48 5,937.02 8,000.00 5,905.61 134.93 83.29 100.75 -2,707.16 28.57 667.08 446.83 220.25 3.029 10450.00 5,937.06 7,950.00 5,903.32 135.19 62.19 99.18 -2,658.27 36.70 666.32 446.87 219.45 3.036 10,450.00 5,937.06 7,975.00 5,904.06 135.19 82.73 99.25 -2,682.68 33.37 666.24 446.11 220.13 3.027 10,471.84 5,937.08 7,925.00 5,903.02 135.49 81.65 97.63 -2,633.87 44.16 666.78 447.42 219.35 3.040 10,485.63 5,937.08 7,900.00 5,901.92 135.68 81.10 96.57 -2,609.33 48.78 666.95 448.01 218.94 3.046 10,500.00 5,937.08 7,875.00 5,900.41 135.88 80.53 95.44 -2,584.65 52.47 666.63 448.16 218.47 3.051 10,513.18 5,937.07 7,850.00 5,899.00 136.06 79.94 94.39 -2,559.81 54.91 665.45 447.56 217.89 3.054 10,526.96 5,937.04 7,825.00 5,897.88 136.26 79.34 93.32 -2,534.88 56.34 663.69 446.40 217.28 3.054 10,550.00 5,936.99 7,775.00 5,897.12 136.57 78.13 91.63 -2,484.92 57.85 659.97 444.38 215.59 3.061 10,550.00 5,936.99 7,800.00 5,897.12 136.57 78.74 91.63 -2,509.92 57.48 662.12 444.96 217.16 3.049 10,568.39 5,936.93 7,750.00 5,897.86 136.83 77.50 90.39 -2,459.94 57.47 657.49 442.35 215.14 3.056 10,582.11 5,936.88 7,725.00 5,897.64 137.02 76.87 89.40 -2,435.08 55.04 653.50 439.19 214.30 3.049 10,600.00 5,936.80 7,700.00 5,896.47 137.27 76.21 88.01 -2,410.52 50.50 647.91 434.17 213.73 3.031 10,674.86 5,936.43 7,675.00 5,895.05 138.34 75.55 93.12 -2,386.23 44.78 640.68 423.34 217.35 2.946 Normal Operations 10,776.07 5,935.94 7,650.00 5,893.59 139.86 74.90 100.05 -2,361.94 39.05 630.64 409.94 220.70 2.857 Normal Operations 10,867.67 5,935.50 7,625.00 5,892.18 141.29 74.26 106.29 -2,337.47 34.15 618.73 397.46 221.27 2.796 Normal Operations CC - Min centre to center distance or covergent point, SF - min separation factor. ES - min ellipse separation 10/16/2019 1 27 37PM Page 13 COMPASS 5000 14 Build 85H r ConoCOPhil lilts Company: ConocoPhillips Alaska Inc_Kuparuk Project: Kuparuk River Unit_2 Reference Site: Kuparuk 3H Pad Site Error: 0.00 usft Reference Well: 31-1-01 Well Error: 0.00 usft Reference Wellbore 3H-01AL1 Reference Design: 3H-01AL1_wp01 ConocoPhillips Anticollision Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset TVD Reference: Offset Design Kuparuk 3H Pad - 31-1-26 - 31-1-261-1-01 - 31-1-261-1-01 Between Survey Program: 121 -MWD OWSG, 6230-MWD-INC_ONLY, 6350 -MWD OWSG, 6772 -MWD -INC -ONLY, 6890 -MWD OWSG Reference Ellipses Offset Factor Semi Major Axis (usft) 605.37 Measured Vertical Measured Vertical Reference offset Azimuth Offset Wellbore Centre Depth Depth Depth Depth 343.54 219.36 from North .NI -S +E/ -W (usft) (usft) (usft) (usft) (usft) (usft) 1°) (usft) (usft) 10950.11 5,935.13 7,600.00 5,890.59 142.61 73.63 111.84 -2,312.84 30.16 11,000.00 5,934.91 7,575.00 5,889.44 143.40 73.01 115.14 -2,288.06 27.07 11,015.93 5,934.84 7,550.00 5,868.45 143.66 72.41 113.81 -2,263.21 24.53 11,028.20 5,934.78 7,525.00 5,887.67 143.86 71.82 112.75 -2,238.33 22.21 11,050.00 5,934.69 7,475.00 5,888.87 144.22 70.64 111.10 -2,188.61 17.12 11,050.00 5,934.69 7,500.00 5,888.00 144.22 71.23 111.14 -2,213.44 19.92 11,065.73 5,934.82 7,450.00 5,889.70 144.48 70.05 109.95 -2,163.98 12.94 11,077.86 5,934.57 7,425.00 5,890.60 144.68 69.46 109.05 -2,139.64 7.32 11,089.80 5,934.52 7,400.00 5,891.78 144.88 68.88 108.18 -2,115.61 0.54 11,100.00 5,934.47 7,375.00 5,892.58 145.05 68.30 107.37 -2,092.18 -8.11 11,111.92 5,934.42 7,350.00 5,892.53 145.25 67.74 106.30 -2,069.63 -18.89 11,122.10 5,934.38 7,325.00 5,891.97 145.43 67.21 105.26 -2,047.86 -31.15 11,131.96 5,934.34 7,300.00 5,891.60 145.60 66.70 104.23 -2,026.72 -44.49 11,141.85 5,934.29 7,275.00 5,891.97 145.76 66.20 103.27 -2,005.87 -58.28 11,150.00 5,934.26 7,250.00 5,891.73 145.90 65.73 102.30 -1,985.46 -72.71 11,161.75 5,934.25 7,225.00 5,891.78 146.11 65.27 101.18 -1,965.33 -87.53 11,172.19 5,934.31 7,200.00 5,892.74 146.29 64.83 100.25 -1,945.14 -102.24 11,183.43 5,934.46 7,175.00 5,894.20 146.48 64.39 99.31 -1,924.53 -116.32 11,200.00 5,934.81 7,150.00 5,894.73 146.76 63.96 97.85 -1,903.68 -130.09 11,208.08 5,935.04 7,125.00 5,895.27 146.90 63.53 96.82 -1,882.21 -142.89 11,221.66 5,935.52 7,100.00 5,895.59 147.14 63.12 95.34 -1,860.41 -155.11 11,236.22 5,936.16 7,075.00 5,896.19 147.39 62.70 93.79 -1,838.08 -166.33 11,250.00 5,936.88 7,050.00 5,897.34 147.63 62.29 92.34 -1,815.10 -176.10 11,268.74 5,938.05 7,025.00 5,898.61 147.96 61.88 90.58 -1,791.61 -184.53 11,286.85 5,939.38 7,000.00 5,901.20 148.27 61.48 89.21 -1,767.49 -190.52 11,309.27 5,941.28 6,975.00 5,904.96 148.66 61.09 89.05 -1,743.17 -194.90 11,339.44 5,943.90 6,950.00 5,9%08 149.19 60.70 91.37 -1,718.98 -198.54 11,368.65 5,946.43 6,925.00 5,916.34 149.71 60.34 94.00 -1,695.02 -202.01 11,397.12 5,948.90 6,900.00 5,923.25 150.22 59.98 96.87 -1,671.19 -204.99 11,425.37 5,951.33 6,875.00 5,930.33 150.73 59.70 99.93 -1,647.27 -206.66 11,452.96 5,953.69 6,850.00 5,937.28 151.23 59.56 103.04 -1,623.30 -208.12 11,479.88 5,955.98 6,825.00 5,943.87 151.73 59.53 106.12 -1,599.22 -209.47 11,506.14 5,958.20 6,800.00 5,949.50 152.20 59.52 108.93 -1,574.90 -210.78 11,531.71 5,960.35 6,775.00 5,953.73 152.67 59.51 111.17 -1,550.30 -212.08 11,556.39 5,962.40 6,750.00 5,957.10 153.12 59.15 112.96 -1,525.57 -213.52 11,579.96 5,964.34 6,725.00 5,960.86 153.56 58.68 114.98 -1,500.92 -215.29 Well 3H-01 31-1-01 @ 76.00usft (3H-01) 3H-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Site Error: 0.00 usft Offset Well Error: 0.00 usft Distance Between Between Minimum Separation Warning Centres Ellipses Separation Factor (usft) (usft) (usft) 605.37 385.61 219.76 2.755 Normal Operations 590.90 372.52 218.38 2.706 Normal Operations 576.66 357.89 218.77 2.636 Normal Operations 562.90 343.54 219.36 2.566 Normal Operations 535.73 315.07 220.66 2.428 Caution Monitor Closely 549.52 330.05 219.47 2.504 Normal Operations 521.22 300.20 221.01 2.358 Caution Monitor Closely 505.85 284.39 221.46 2.284 Caution Monitor Closely 489.80 267.95 221.85 2.208 Caution Monitor Closely 472.61 250.41 222.20 2.127 Caution Monitor Closely 454.11 231.72 222.39 2.042 Caution Monitor Closely 434.81 212.27 222.54 1.954 Caution Monitor Closely 414.93 192.35 222.58 1.864 Caution Monitor Closely 394.83 172.15 222.68 1.773 Caution Monitor Closely 374.55 151.88 222.66 1.682 Caution Monitor Closely 354.13 131.51 222.62 1.591 Caution Monitor Closely 333.86 111.28 222.58 1.500 Take Immediate Action 314.19 91.64 222.55 1.412 Take Immediate Action 295.13 72.64 222.49 1.326 Take Immediate Action 276.97 54.86 222.11 1.247 Take Immediate Action 259.65 37.94 221.71 1.171 Take Immediate Action 243.44 22.23 221.22 1.100 Take Immediate Action 228.75 8.28 220.47 1.038 Take Immediate Action 215.61 -4.37 219.98 0.980 STOP Drilling 204.90 -14.55 219.44 0.934 STOP Drilling 195.89 -23.73 219.62 0.892 STOP Drilling 186.84 -34.33 221.17 0.845 STOP Drilling 176.96 -45.73 222.69 0.795 STOP Drilling 166.71 -57.40 224.10 0.744 STOP Drilling 156.93 -67.32 224.25 0.700 STOP Drilling 146.67 -77.31 223.98 0.655 STOP Drilling 135.87 -88.68 224.55 0.605 STOP Drilling 124.47 -100.33 224.80 0.554 STOP Drilling 112.45 -112.23 224.68 0.501 STOP Drilling 99.68 -127.05 226.73 0.440 STOP Drilling 85.99 -140.10 226.08 0.380 STOP Drilling, CC, ES, SF CC - Min Centre to center distance or covergent point SF - min separation factor.. ES - min ellipse separation 10/16/2019 1 27 37PM Page 14 COMPASS 5000 14 Build 85H Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 3H-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 3H-26 - 31-1-261-1-02 - 3H-261-1-02 ConocoPhillips Y, ConocoPhillips Anticollision Report Company: ConocoPhillips Alaska Inc Kuparuk Local Co-ordinate Reference Project: Kuparuk River Unit_2 TVD Reference: Reference Site: Kuparuk 3H Pad MD Reference: Site Error: 0.00 usft North Reference: Reference Well: 31-1-01 Survey Calculation Method: Well Error: 0.00 usft Output errors are at Reference Wellbore 3H-01AL1 Database: Reference Design: 3H-01AL1_wp01 Offset TVD Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 3H-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 3H-26 - 31-1-261-1-02 - 3H-261-1-02 Offset Site Error: 0 00 usft Survey Program: 121 -MWD OWSG, 6230 -MWD -INC -ONLY, 6350 -MWD OWSG, 6772-MWD-INC_ONLY, 6890 -MWD OWSG, 7408 -MWD -INC -ONLY, 7471 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North .N/s .EJ -W Centres Ellipses Separation Factor (usft) (usft) lush) (usft) (usft) (usft) (°) (usft) (usft) (usft) lush) (usft) 11,050.00 5,934.69 7,500.00 5,881.03 144.22 69.78 110.64 -2,200.89 48.60 570.03 348.73 221.29 2.576 Normal Operations 11,050.00 5,934.69 7,525.00 5,883.18 144.22 70.06 111.08 -2,216.72 67.79 593.88 372.76 221.12 2.686 Normal Operations 11,050.00 5,934.69 7,550.00 5,886.25 144.22 70.30 111.57 -2,229.20 89.20 618.23 397.06 221.16 2.795 Normal Operations 11,050.00 5,934.69 7,575.00 5,889.28 144.22 70.49 112.03 -2,237.96 112.40 642.58 421.20 221.38 2.903 Normal Operations 11,050.00 5,934.69 7,600.00 5,891.15 144.22 70.62 112.35 -2,243.97 136.57 666.75 445.07 221.68 3.008 11,050.00 5,934.69 7,625.00 5,893.21 14422 70.69 112.66 -2,245.91 161.38 689.81 467.72 222.09 3.106 11,060.78 5,934.64 7,475.00 5,881.25 144.40 69.45 109.66 -2,182.20 32.07 547.05 325.75 221.30 2.472 Caution Monitor Closely 11,066.92 5,934.62 7,650.00 5,895.37 144.50 70.69 111.77 -2,243.52 186.14 710.81 488.63 222.19 3.199 11,068.64 5,934.61 7,450.00 5,884.76 144.53 69.12 109.25 -2,161.44 18.65 525.76 307.61 218.15 2.410 Caution Monitor Closely 11,075.46 5,934.58 7,675.00 5,896.96 144.64 70.59 111.39 -2,237.01 210.19 729.75 507.14 222.60 3.278 11,078.31 5,934.57 7,425.00 5,889.72 144.69 69.00 108.92 -2,139.28 8.26 506.63 287.94 218.69 2.317 Caution Monitor Closely 11,085.52 5,934.54 7,700.00 5,897.80 144.81 70.42 110.82 -2,226.17 232.64 745.67 522.61 223.05 3.343 11,089.80 5,934.52 7,400.00 5,891.78 144.88 68.88 108.18 -2,115.61 0.54 489.80 267.95 221.85 2.208 Caution Monitor Closely 11,100.00 5,934.47 7,375.00 5,892.58 145.05 68.30 107.37 -2,092.18 -8.11 472.61 250.41 222.20 2.127 Caution Monitor Closely 11,100.00 5,934.47 7,725.00 5,898.26 145.05 70.19 109.89 -2,210.89 252.40 757.64 534.16 223.48 3.390 11,100.00 5,934.47 7,750.00 5,898.03 145.05 69.93 109.92 -2,193.85 270.68 767.99 543.96 224.02 3.428 11,111.92 5,934.42 7,350.00 5,892.53 145.25 67.74 106.30 -2,069.63 -18.89 454.11 231.72 222.39 2.042 Caution Monitor Closely 11,120.56 5,934.38 7,775.00 5,898.17 145.40 69.67 108.53 -2,176.23 288.41 777.74 553.38 224.36 3.466 11,122.10 5,934.38 7,325.00 5,891.97 145.43 67.21 105.26 -2,047.86 -31.15 434.81 212.27 222.54 1.954 Caution Monitor Closely 11,131.96 5,934.34 7,300.00 5,891.60 145.60 66.70 104.23 -2,026.72 44.49 414.93 192.35 222.58 1.864 Caution Monitor Closely 11,132.26 5,934.33 7,800.00 5,898.13 145.60 69.40 107.75 -2,158.53 306.07 787.83 563.12 224.72 3.506 11,141.85 5,934.29 7,275.00 5,891.97 145.76 66.20 103.27 -2,005.87 -58.28 394.83 172.15 222.68 1.773 Caution Monitor Closely 11,150.00 5,934.26 7,250.00 5,891.73 145.90 65.73 102.30 -1,985.46 -72.71 374.55 151.88 222.66 1.682 Caution Monitor Closely 11,150.00 5,934.26 7,825.00 5,897.96 145.90 69.15 106.54 -2,140.98 323.88 798.49 573.45 225.05 3.548 11,150.00 5,934.26 7,850.00 5,897.77 145.90 68.91 106.57 -2,123.71 341.95 809.74 584.47 225.27 3.595 11,161.75 5,934.25 7,225.00 5,891.78 146.11 65.27 101.18 -1,965.33 -87.53 354.13 131.51 222.62 1.591 Caution Monitor Closely 11,166.94 5,934.27 7,875.00 5,897.51 146.19 68.68 105.57 -2,106.79 360.35 821.70 596.15 225.55 3.643 11,172.19 5,934.31 7,200.00 5,892.74 146.29 64.83 100.25 -1,945.14 -102.24 333.86 111.28 222.58 1.500 Take Immediate Action 11,178.24 5,934.38 7,900.00 5,897.30 146.39 68.45 104.90 -2,090.33 379.17 834.48 608.72 225.76 3.696 11,183.43 5,934.46 7,175.00 5,894.20 146.48 64.39 99.31 -1,924.53 -116.32 314.19 91.64 222.55 1.412 Take Immediate Action 11,200.00 5,934.81 7,150.00 5,894.73 146.76 63.96 97.85 -1,903.68 -130.09 295.13 72.64 222.49 1.326 Take Immediate Action 11,200.00 5,934.81 7,925.00 5,897.00 146.76 68.23 103.61 -2,073.45 397.60 847.18 621.08 226.09 3.747 11,200.00 5,934.81 7,950.00 5,896.81 146.76 68.00 103.60 -2,055.81 415.32 858.97 632.91 226.06 3.800 11,208.08 5,935.04 7,125.00 5,895.27 146.90 63.53 96.82 -1,882.21 -142.89 276.97 54.86 222.11 1.247 Take Immediate Action 11,212.49 5,935.18 7,975.00 5,896.99 146.98 67.75 102.87 -2,037.30 432.11 870.02 643.82 226.20 3.846 11,221.65 5,935.52 7,100.00 5,895.59 147.14 63.12 95.34 -1,860.41 -155.11 259.65 37.94 221.71 1.171 Take Immediate Action 11,224.27 5,935.63 8,000.00 5,897.37 147.19 67.50 102.18 -2,017.74 447.66 879.88 653.59 226.29 3.888 11,236.15 5,936.16 8,025.00 5,897.23 147.39 67.24 101.44 -1,997.39 462.18 888.85 662.51 226.34 3.927 11,236.22 5,936.16 7,075.00 5,896.19 147.39 62.70 93.79 -1,838.08 -166.33 243.44 22.23 221.22 1.100 Take Immediate Action 11,250.00 5,936.88 7,050.00 5,897.34 147.63 62.29 92.34 -1,815.10 -176.10 228.75 8.28 220.47 1.038 Take Immediate Action 11,250.00 5,936.88 8,050.00 5,897.54 147.63 66.97 100.61 -1,976.17 475.39 896.64 670.23 226.41 3.960 11,250.00 5,936.88 8,075.00 5,897.72 147.63 66.69 100.55 -1,954.42 487.72 903.88 677.92 225.96 4.000 11,268.74 5,938.05 7,025.00 5,898.61 147.96 61.88 90.58 -1,791.61 -184.53 215.61 -4.37 219.98 0.980 STOP Drilling 11,272.41 5,938.31 8,100.00 5,897.91 148.02 66.42 99.20 -1,932.29 499.34 910.43 684.16 226.28 4.024 11,284.54 5,939.20 8,125.00 5,898.58 148.23 66.14 98.47 -1,909.81 510.26 916.64 690.46 226.19 4.053 11,286.85 5,939.38 7,000.00 5,901.20 148.27 61.48 89.21 -1,767.49 -190.52 204.90 -14.55 219.44 0.934 STOP Drilling 11,309.27 5,941.28 6,975.00 5,904.96 148.66 61.09 89.05 -1,743.17 -194.90 195.89 -23.73 219.62 0.892 STOP Drilling 11,339.44 5,943.90 6,950.00 5,910.08 149.19 60.70 91.37 -1,718.98 -198.54 186.84 -34.33 221.17 0.845 STOP Drilling 11,368.65 5,946.43 6,925.00 5,916.34 149.71 60.34 94.00 -1,695.02 -202.01 176.96 45.73 222.69 0.795 STOP Drilling 11,397.12 5,948.90 6,900.00 5,923.25 150.22 59.98 96.87 -1,671.19 -204.99 166.71 -57.40 224.10 0.744 STOP Drilling 11,425.37 5,951.33 6,875.00 5,930.33 150.73 59.70 99.93 -1,647,27 -206.66 156.93 -67.32 224.25 0.700 STOP Drilling 11,452.96 5,953.69 6,850.00 5,937.28 151.23 59.56 103.04 -1,623.30 -208.12 146.67 -77.31 223.98 0.655 STOP Drilling CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 127 37PM Page 15 COMPASS 5000 14 Build 85H 1W ConocoPhillips Company: Project: Reference Site: Site Error: Reference Well: Well Error: Reference Wellbore Reference Design: ConocoPhillips Alaska Inc_Kuparuk Kuparuk River Unit _2 Kuparuk 3H Pad 0.00 usft 3H-01 0.00 usft 3H-01AL1 31-1-01AL1_wp01 ConocoPhillips Anticollision Report Local Co-ordinate Reference: ND Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Offset ND Reference: Well 3H-01 31-1-01 @ 76.00usft (31-1-01) 31-1-01 @ 76.00usft (31-1-01) True Minimum Curvature 2.00 sigma EDT 14 Alaska Production Offset Datum Offset Design Kuparuk 3H Pad - 31-1-26 - 31-1-261-1-02 - 31-1-261-1-02 Offset Site Error: 0.00 usfl Survey Program: 121 -MWD OWSG, 6230 -MWD -INC ONLY, 6350 -MWD OWSG, 6772 -MWD -INC -ONLY, 6890 -MWD OWSG, 7408 -MWD -INC -ONLY, 7471 -MWD OWSG Offset Well Error: 0.00 usft Reference Offset Semi Major Axis Distance Measured Vertical Measured Vertical Reference Offset Azimuth Offset Wellbore Centre Between Between Minimum Separation Warning Depth Depth Depth Depth from North .N/S +El -W Centres Ellipses Separation Factor (usft) (usft) (usft) (usft) (us") (usft) (°) (usft) (usft) (usft) (usft) (usft) 11,479.88 5,955.98 6,825.00 5,943.87 151.73 59.53 106.12 -1,599.22 -209.47 135.87 -88.68 224.55 0,605 STOP Drilling 11,506.14 5,958.20 6,800.00 5,949.50 152,20 59.52 108.93 -1,574.90 -210.78 124.47 -100.33 224.80 0.554 STOP Drilling 11,531.71 5,960.35 6,775.00 5,953.73 152.67 59.51 111.17 -1,550.30 -212.08 112.45 -112.23 224.68 0.501 STOP Drilling 11,556.39 5,962.40 6,750.00 5,957.10 153.12 59.15 112.96 -1,525.57 -213.52 99.68 -127.05 226.73 0.440 STOP Drilling 11,579.96 5,964.34 6,725.00 5,960.86 153.56 58.68 114.98 -1,500.92 -215.29 85.99 -140.10 226.08 0.380 STOP Dolling, CC, ES, SF CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation 10/16/2019 1 27 37PM Page 16 COMPASS 5000 14 Build 85H U O � a) Q .— Q M L a) -0 E a) m i Ln a) C O N •N C6 O C � � u L E CIJ _ 4O O l4 ^n a) v) Y 3 � N L N � a'd Q) a) O 3 v o t Y O ru N _O C Q N Q m a) Q ro LM a) U L on a) f6 o O u a) Q J aA O c : A v O -a O E _ + C c O O N to a) U u N Q C Q m R Q N VI i Q p a) 0- co cv 3 0 Q v+� v O o M t 3 O 4-1 a)N M (U cu T m Ln > of p o (, y a — u N O L L a) N _ v v N E a) D o 'n L fu LLJLLJ a) ro a v V v J - +� > a) z .c z =3 aco E > c N N uiU U 7 c ro -O X = 4`+ +`J v aNi w o v 2 c O — ro O 3 CL a) a) O 3a3) t O :3 +� C U Y � O Q) O J c a) N � o a) V T H C a) O C N C L Li IA H t/01 >- I O V > O Q 0 to V; -1 co Q O V) 2 ca a n m o @) m o Q) N C Y X_O W L a) U V) ri O O in Qi > N N rI E N = v a vi w Lu E a) cr U w E = (7 O Q c z v = 5 U w N Ln a) X E u a) m V) Vi cr- x a) a) � ? V l6 al 2 Lo - (I. H L O CL a) c O 0 U C f6 O C: O on ns un c a O F - (n a) vi C) Ln E cv c G Ln C 0 .Ln E C O U c O a) C 0 U Lnm C7 c la O f6 Y ro El Q) U _ O U ri Ln M O N tD c -I M M M M N I� N O O 0) 0) -o v � -D E C 61 y C H O 4� N a) v v o � v v C 7 p � O w C Gf c c ti ti Y � f6 OJ t0 X Q o LL—. T v - > @ 3 � U � O O m a o � �vm o � � 0 0 U > a c T w O E C cc N G o E V U OY N C o � L C U j � N o _ T O a o Y -o E oNv Y 3 f0 c o .E E v v Y o v v o -_v co m 3 C j f0 O R H C u I O v u u aj F- O £aw " ° y m T O C O °° c v c o m 7 v C pq O_ C v to v 3 v � � a Elu m v �'-> w m 0 u m " F- 0 0 O Z U L mC 3 J C a - u Z N v Z Y v w C D LL � aj 0 z .� O v o_ TRANSMITTAL LETTER CHECKLIST WELL NAME:�(�% PTD: Z -l% — / 5 ✓ Development _ Service Exploratory Stratigraphic Test Non -Conventional FIELD: C G ! y te-1, l Ve—I— POOL: Zt;- 2q j— Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of well Permit LATERAL �existing No. 2 ( — API No. 50-1-2�"`-- (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -) from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of weld until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company) in the attached application, the following well logs are / also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - PTD#:2191590 Com Administration 1 Appr Date yl��=iili[c7E►��yF�7 10 11 12 13 14 15 16 17 Well Name: KUPARUK RIV UNIT 3H-01AL1 Program DEVWell bore seg d❑ my ConocoPhillips Alaska, Inc. _.- Initial Class/Type DEV/PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑ Permit- fee attached - - - - - - - - - NA - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Lease number appropriate_ - - - Yes .... Surf Loc &_TD lie in ADL0025531; Top productive_ interval lies_ in ADL0025547._ Unique well name and number - Yes - - - - - - Kuparuk River Oil Pool, governed by Conservation Order No. 432D Well located in_a_d_efined_pool_ Yes no CO 432D Rule 3: There shall be no restrictions as t_o_w_ell spacing except that no pay shall be opened in_ Well located proper distance from_ drilling unit -boundary_ - _ Yes - - - a well_ closer_ than 500 feet to an property-line where ownership or Landownership changes.- - Well located proper distance from other wells_ _ - - - - . Yes As planned, well conforms with -spacing- requirements. Sufficient acreage -available in -drilling unit_ - Yes - - - - - - - - - If_deviated, is -wellbore plat -included - - _ . - Yes - - - - - - _ - _ Operator only affected party_ - - - Yes - - Operator has_ appropriate- bond in force - - - - - - Yes - - - - _ . Permit_can be issued without conservation order - - - - - - - Yes CDR3 is ongoing operations. Previous ops demonstrate good -truck support and adequate tankage_ - - - Permit_can be issued without administrative- appr_ova_l _ - - - - - Yes _ - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - _ - - - - Can permit be approved before 15-daywait_Yes ------ - - Sundry -- --- Well -located within area and -strata authorized by Injection Order # (put 10# in comments) (For NA Yes - A11 wells -within -1/4 mile -area -of review identified (For service well only) _ - - _ _ - - NA_ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Pre -produced injector: duration of pre -pro -duction Less_ than 3 months_ (For service well only) NA_ - - - - _ _ _ _ - - - - - . - - - - N_onconven, gas conforms to AS31.05.030(j.1_.A),(j.2.A-D) - - - - - - - - - _ NA - Drilling fluid -program schematic & equiplist_adequat_e_ Geologic Engineering Public Date: Commissioner: DaCommissioner: Date D � I Z Commissioner 18 or Conductor string_provided - - - - - - - NA_ CTD sidetrack_ from existing wellbore.- All drilling will be in the reservoir. Engineering 19 Surface protects all known USDWs - - - - - _ _ N_A_ CTD sidetrack from existing. wellbore. _All_ drilling will be in the reservoir._ 20 CMT_v_ol_ adequate to circulate_on.conductor_ & surf_csg _ _ _ _ - - NA_ - - nthe_ reservoir._ - - - CTD sidetrack from existing wellbore._ All drilling will be in -the - 21 CMT_ vol_ adequate to tie -in -long string to surf csg_ - - - NA_ - - - - - CTD sidetrack from existing wellbore.- All drilling will be in the_ reservoir._ - - - - - - - . . 22 _C_MT_will coverall known -productive horizons_ - - _ N_o_ - - - - - - CTD sidetrack from. existing wellbore._ All drilling will be in the_ reservoir._ Slotted_liner_will-be-run. 23 Casing designs adequate for C,_T, B &_permafr_ost_ - Yes - - - - - - - - - - - 24 Adequate -tankage or reserve pit - - - - - - - Yes CDR3 is ongoing operations. Previous ops demonstrate good -truck support and adequate tankage_ - - - 25 If_a_re-drill , has -a 10-403 for abandonment been approved-499Yes Sundry -- --- 26 Adequate wellbore separation -proposed - - - - - Yes - _ - _ _ - - - - - - - - _ - . . - - - 27 If_diverterrequired,does itmeet _regulations _ - _ - - - - - - - - - - Yes.. - - - - - - - - - - -- - - - - - -- - - - - - -- - - _ - - - - - - - - - - - - - Appr Date 28 Drilling fluid -program schematic & equiplist_adequat_e_ Yes . MGR 11/15/2019 29 BOPEs,_do they meet_ regulation - - - - - - - - Yes - - - - - - - - - - - - - - 30 _B_OPE_press rating appropriate; test to -(put psig in comments)_ - - Yes - 31 Choke -manifold complies w/API_RP-53 (May 84)_ - . - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ 32 Work will occur without operation shutdown - - - - Yes - CDR3 is in_ ongoin operations. - - - - - - 33 Is presence_ of 1-12S gas_ probable - - - No - - - - - - - - - . - _ - - . . 34 Mechanical_ condition of wells within AOR verified (For_ service well only) - - - - - - - _ NA_ - - - - - - - This is a development well. ----------- 135 Permit_can be issued w/o hydrogen-s-ulfide measures - - - - - - - - - - - - - . No 3H -Pad wells are H2S-bearing._ H2S_measures are required. - - - - Geology 36 Data_p_resented on potential overpressure zones - - - - - - - - - - - - - - - - - - - - Yes - - - Max. potential -res. pressure is 11.7 ppg, EMW, expected -res. pressure is 8.8 ppg EMW_. Well will be Appr Date 37 Seismic analysis_ of shallow gas -zones_ - - - - - NA drilled using 8.6_ ppg _mud,_a_ coiled -tubing rig, and -managed_ pressure drilling technique to control_ SFD 11/13/2019 38 Seabed condition survey -(if off -shore) - - - - - - - - - - N_A_ - - - - - formation pressures and stabilize shale sections with constant BHP of about_11.8ppg EMW. - 39 Contact name/phone for weekly- progress reports_ [exploratory only] - _ NA- - - . - - - - - - - - - - - - - - - - - - - - Geologic Engineering Public Date: Commissioner: DaCommissioner: Date D � I Z Commissioner