Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout219-108DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20806-60-00Well Name/No. COLVILLE RIV UNIT CD5-26L1Completion Status1-OILCompletion Date12/4/2019Permit to Drill2191080Operator ConocoPhillips Alaska, Inc.MD17932TVD7634Current Status1-OIL4/16/2020UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR/Res/Sonic LogNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC12/10/20192202 28248 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD002_Drill.las31625EDDigital DataC12/10/201914330 14446 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD005_Drill.las31625EDDigital DataC12/10/201914383 17932 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD006_Drill.las31625EDDigital DataC12/10/201914140 14450 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD006_Ream Down 3.las31625EDDigital DataC12/10/201950 2252 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope_Gamma_Ray_ RM_LWD001_Drill.las31625EDDigital DataC12/10/201946 17932 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope_Service_RM_Well Composite.las31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Gamma_Ray_LWD001_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD002_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD005_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD006_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD006_Ream_Down_003_RM.dlis31625EDDigital DataThursday, April 16, 2020AOGCCPage 1 of 3CPAI CD5-,_26L1_Scope_Service_RM_Well Composite.las DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20806-60-00Well Name/No. COLVILLE RIV UNIT CD5-26L1Completion Status1-OILCompletion Date12/4/2019Permit to Drill2191080Operator ConocoPhillips Alaska, Inc.MD17932TVD7634Current Status1-OIL4/16/2020UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_Well Composite_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_2MD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_2TVD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_5MD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_5TVD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Canvas].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Macro].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Petrel].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Survey].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys.pdf31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Canvas].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Macro].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Petrel].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Survey].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys.pdf31625EDDigital Data0 0 2191080 COLVILLE RIV UNIT CRU CD5-26L1 LOG HEADERS31625LogLog Header ScansThursday, April 16, 2020AOGCCPage 2 of 3 DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20806-60-00Well Name/No. COLVILLE RIV UNIT CD5-26L1Completion Status1-OILCompletion Date12/4/2019Permit to Drill2191080Operator ConocoPhillips Alaska, Inc.MD17932TVD7634Current Status1-OIL4/16/2020UICNoINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:12/4/2019Release Date:8/15/2019Thursday, April 16, 2020AOGCCPage 3 of 3M. Guhl4/16/2020 RECEIVED STATE OF ALASKA JAN 10 2020 ALASKA OIL AND GAS CONSERVATION COMMISSION r, WELL COMPLETION OR RECOMPLETION REPORT AN L 1a. Well Status: Oil R] - Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 's�. "f `^ 1b. Well Class: Development I] Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Aband.: 12/4/2019 14. Permit to Drill Number / Sundry: 219-108 ' 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 11/24/2019 15. API Number: 50-103-20806-60-00 4a. Location of Well (Governmental Section): Surface: 438' FNL, 2919' FEL, Sec 18, T11N, R4E, UM • Top of Productive Interval: 132' FN L, 4634' FEL, Sec 29, T11 N, R4E, UM Total Depth: 3460' FNL, 2855' FEL, Sec 29, T11N, R4E, UM 8. Date TD Reached: 11/27/2019 16. Well Name and Number: CRU C135-261-1 . 9. Ref Elevations: KB:73 - GL:33.7 - BF: 17. Field / Pool(s): Coleville River Unit /Alpine Oil Pool 10. Plug Back Depth MD/TVD: 17,932/7634 - 18. Property Designation: ASRC.NPR4,ASRC-AA092344, ASRC-NPR2, ASRC.NPR5 4b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 349057 y- 5965780 ' Zone- 4 . TPI: x- 352456 y- 5955457 Zone- 4 Total Depth: x- 354181 y- 5952095 Zone- 4 11. Total Depth MD/TVD: . 17932/7634 - 19. DNR Approval Number: 932669, 340757, 932128, 342658 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/TVD: • 1325/1320 5. Directional or Inclination Survey: Yes Q (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD/TVD: • 14369/7614 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary GR/Res/Sonic Log 23. CASING, LINER AND CEMENTING RECORD WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED 20 94 H-40 35 115 35 115 42 10 yds 103/4 45.5 L-80 40 2240 40 2179 13.5 850sx 11.0ppg Class G 75/8 29.7 L-80 78.4 15282 78.4 7717 9.875 1003sx 15.8ppg Class G 4112 12.6 L-80 14369 17932 7614 7634 6.5 OPEN HOLE 24. Open to production or injection? Yes E] No ❑ If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation Size and Number; Date Perfd): OPEN HOLE @: 14369-17932 MD and 7614-7634 TVD ,OFr,F'LETiON DATE lijw�9 VERIFIED 25. TUBING RECORD SIZE DEPTHS T (MD) PACKER SET (MD/TVD) 4112 14610 14086/7572 14549/7634 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes ❑ No ❑ Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 12/28/2019 Method of Operation (Flo/wing, gas lift, etc.): G k 5 Z- f-� Date of Test: 1/6/2020 Hours Tested: 22 Production for Test Period Oil -Bbl: 1611 Gas -MCF: 484 Water -Bbl: 748 Choke Size: 128 beans Gas -Oil Ratio: 301 Flow Tubing Press. 436 Casinq Press: 1705 Calculated 24 -Hour Rate Oil -Bbl: 1758 Gas -MCF: 529 Water -Bbl: 816 Oil Gravity - API (corr): Form 10-407 Revised 5/2017 17' _CONTINUED ON PAGE 2 Submit ORIGINIAL only' RBDMS (� JAN 10 2020 �:_ar ' 28. CORE DATA Conventional Core(s): Yes ❑ No 21 Sidewall Cores: Yes ❑ No 2] , If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No 21 If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1325 1320 Attach separate pages to this form, if needed, and submit detailed test Top of Productive Interval 14145 7583 information, including reports, per 20 AAC 25.071. Formation @ TPI -Alpine C C-30 z 3 g I 23 C-10 K-3 Sz 1 s813 yarn K2 Albian 97 4Go ,q Zq Albian 96 14 Gaq 12,94 �IS9 HRZ 131115' Kalubik ("5( 4 39 Kuparuik C 3 s9 13,95-3, -+361 LCU/Miluveach TD 17932 7635 Formation at total depth: Alpine C 31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, oaleontological report, production or well test results, r 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: G.L. Alvord Contact Name: Matt Smith Authorized Title: Alaska Drilling Manager Contact Email: Matt. Sm02(a)cop. com Authorized Contact Phone: 263-4324 Signature: _ >�. lr • Date: 1 I l 2- INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only Winston, Hugh E (CED) From: Loepp, Victoria T (CED) Sent: Friday, January 24, 2020 11:26 AM To: Winston, Hugh E (CED) Subject: FW: CRU CD5-26L1(PTD 219-108) Completions tops correction on 10-407 Attachments: CD5-26_Completion_Tops.xlsx Hugh, Could you please include a copy of this email with the 10-407 for the subject well. We may hand correct the original 10- 407 with this information. Please handle and let me know if you have any questions. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp(a)alaska.gov CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov From: Loepp, Victoria T (CED) Sent: Friday, January 24, 2020 11:24 AM To: Haggerty -Sherrod, Ann (Northland Staffing Services) (Ann.Haggerty-Sherrod@contractor.conocophillips.com) <Ann. Haggerty -Sherrod @contractor.conocophillips.com> Cc: Hoffmeister, Kathryn E <Kathryn.E.Hoff meister@conocophillips.com>; Smith, Matt <Matt.Smith2@conocophillips.com> Subject: CRU CD5-26L1(PTD 219-108) Completions tops correction on 10-407 All, The corrected tops are noted and approved. We will update our copy of the 10-407 with this information. Please include this note with your 10-407 record of this well. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Work: (907)793-1247 Victoria. Loepp6d.alaska.QOV CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Victoria Loepp at (907)793-1247 or Victoria. LoeppCalaska.gov From: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com> Sent: Friday, January 24, 2020 11:03 AM To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Cc: Hoffmeister, Kathryn E <KathrVn.E.Hoffmeister@conocophillips.com>; Smith, Matt <Matt.Smith2@conocophillips.com> Subject: FW: CD5-26L1 Completions tops error Good morning Victoria, I am seeking direction on how to proceed from here. I received the attached email this morning from the Geologist for CD5-26 and CD5-26L1. How shall I go forward with the correction. If I re -do the second page then I would need new signatures. Chip Alvord was the original manager signature on the document and he is out now with hip surgery. However he does have someone else who is signing in his absence. We submitted this report 1/20/20 let me know how to proceed from here. Thanks, Ann From: Hoffmeister, Kathryn E <Kathryn.E.Hoffineister@conocophillips.com> Sent: Friday, January 24, 2020 10:34 AM To: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com> Subject: CD5-261_1 Completions tops error Good morning Ann, It was brought to my attention that I had a typo in my CD5-261_1 tops. The tops for the CD5-26 were correct, but when entered the C-30 through Milvueach tops for the CD5-26L1 everything was shifted down one cell. Hopefully this won't lead to any changes as the top of the productive interval and the formation at TD for both wells were correct in the original document. You may have already noticed the error, but here is the corrected tops list. Let me know if you have any questions. Thank you! Kathryn Kathryn Hoffmeister Geologist- WNS Development ATO 1760 907-263-4732 CD5 - 26 Alpine A/C Dual Lateral Producer Final Schematic 20" 94# H-40 Welded Conductor to 115' MD I I 10-3/4" 45.5# L-80 HYD 563 x BTC Surface Casing at 2,240' MD 4-'/z"x1"GLM 4-1/2" 12.6# L-80 Hyd 563 4-'/2" x 1" GLM 7 5/8" 29.7# L-80 TXP Intermediate Casing at 15,281' MD 39# at heel TOC: 12,510' MD/ 6,953' TVD 4'/2" x 1" GLM Upper Completion: 1) 4 %'-12.6# Hyd 563 tubing 2) Shallow nipple profile 3.813" X profile 3) 3x 4-1/,.' x 1" Camco KBMG GLM w/ DV 4) SLB DHG 5) TNT Packer 6) High Pressure 2.813" X sliding sleeve -up to open 7) High Burst X Nipple profile, 2.813" 8) TNT Packer 9) XN Nipple profile, 2.813" Lower Completion: 10)ZXP liner top packer & Flexlock Liner Hanger XO 5" Hydril 521 Box X 4-1/2" H563 pin 11) 4.5" Hydril563 12.6# L-80 w/ Frac Ports C sand Lateral 6 1/2" Hole TD 14,369- 17,932' MD --------------------- ConocoPhillips Alaska. Inc. 1ANS PROD WELLNAME CD5-26 WELLBORE CD5-261-1 HORIZONTAL, CD5-261-1, 19/2020 2:13:03 PM Last Tag Varaeal schematic (ac l) Annotation Depth (kKB) End Date Wellbore Last Mod By LAST TAG: CD5-26L1 jennalt Last Rev Reason HANGER; 34.4 Annotation End Date 1 Wellbore Last Mod By """"""""""""""""""""""""' """"""' """""'" "' REV REASON: Lt Lateral 12/30/2019 CD5-261-7 1jennall Casing Strings Casing Description O110 D(in) ID (in) Top (kKB) Set Depth (kKB) Set Depth (TVD)... Wtllen (1... Grade Top Thread L1 OPEN HOLE 6 1/2 14,369.0 17,932.0 7,634.3 Notes: General & Safety End Date Annotation 12/30/2019 NOTE: VIEW SCHEMATIC w/Alaska Schematic 10.0 CONDUCTOR; 35.0-115.0 SURFACE; 39.8-2,240.2- 9.8-2,240.2NIPPLE; NIPPLE;2,484.8 GAS LIFT; 4,449.3 GAS LIFT; 9,479.9 GAS LIFT; 13,998.1 GAUGE/ PUMP SENSOR; 14,068.0 PACKER; 14,085.8 SLIDING SLEEVE; 14,140.9 1 NIPPLE; 14,257.4 INTERMEDIATE; 78.4-15,281.7 111 1-1 OPEN HOLE; 14,369.0- 17,932.0 Cement Detail Report CD5-26 String: Surface Casing Cement Job: DRILLING ORIGINAL, 10/9/2019 06:00 Cement Details Description Surface Casing Cement Cementing Start Date 10/13/2019 16:00 Cementing End Date 10/13/2019 19:00 Wellbore Name CD5-26 Comment Cement Stages Stage # 1 Description Lead - Surface Casing Cement Objective Lead-Isolate surface casing annulus to surface Top Depth (ftKB) 39.3 Bottom Depth (ftKB) 1,740.0 Full Return? Yes Vol Cement... 113.0 Top Plug? No Btm Plug? Yes Q Pump Init (bbl/m... 5 Q Pump Final (bbl/... 6 Q Pump Avg (bbl/... 6 P Pump Final (psi) 920.0 P Plug Bump (psi) Recip? 1 Yes Stroke (ft) 110.00 Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Lead Cement-Pumped 288.8bbls, 11ppg, Deeperete, 0.5% D167, 0.06 gps D185, 0.1gps D047 1740' to 1328'MD 50% excess 1328'MD-surface 250% excess above permafrost depth Cement Fluids & Additives Fluid Fluid Type Pre Flush Fluid Description Estimated Top (ftKB) 0.0 Est Btm (ftKB) 0.0 Amount (sacks) Class Mudpush II Volume Pumped (bbl) 75.0 Yield (ft'lsack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) 10.50 Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Lead Cement Fluid Description Estimated Top (ftKB) 39.3 Est Btm (ftKB) 1,740.0 Amount (sacks) 850 Class V01ume G 288.8 Pumped (bbl) Yield (ft'/sack) 1.91 Mix H2O Ratio (gal/sa... 6.65 Free Water (%) Density (Ib/gal) 11.00 Plastic Viscosity (cP) 208.0 Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Fluid Fluid Type Fluid Description Estimated Top (ftKB) 1,740.0 Est Btm (ftKB) Amount 1,740.0 (sacks) Class Volume Pumped (bbl) Yield (ft'/sack) Mix H2O Ratio (gal/sa... Free Water I%) Density (Ib/gal) Plastic Viscosity (0) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration Conc Unit label Stage # 2 Description Tail - Surface Casing Cement Objective Tail-Secure the shoe and bottom 500ft of annulus Top Depth (ftKB) 1,740.0 Bottom Depth (ftKB) 2,240.2 Full Return? Vol Yes Cement... Top Plug? Yes Btm Plug? No Q Pump [nit (bbl/m... Q 5 3 Pump Final (bbl/... Q Pump Avg (bbl/... 4 P Pump Final (psi) 445.0 P Plug Bump (psi) 1,000.0 Recip? I Yes Stroke (ft) 10.00 Rotated? No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Tail-Pumped 59.5bbls, 15.8ppg Class G, with D-047 0.05gps, D-255 0.5%, D-065 0.3%, D-186 0.015% 2240'-1740'50% excess Cement Fluids & Additives Fluid Fluid Type Tail Cement Fluid Description Estimated Top (ftKB) 1,740.0 Est Btm (ftKB) Amount 2,240.0 288 (sacks) Class Volume G 59.5 Pumped (bbl) Yield (ft'/sack) 1.16 Mix H2O Ratio (gal/sa... 5.04 Free Water (%) Density (Ib/gal) Plastic 15.80 138.8 Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) Additives Additive Type Concentration I Conc Unit label Page 111 Report Printed: 1/8/2020 Cement Detail Report CD5-26 String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 10/9/2019 06:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 10/26/2019 05:19 10/26/2019 08:00 CD5-26 Comment No losses during cementing. Cement Stages Stage # 1 Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Vol Cement... Top Plug? Btm Plug? Intermediate Casing The greater of 500'MD or 12507VD 12,850.0 15,294.6 No 0.0 Yes Yes Cement of cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 4 2 8 380.0 900.0 Yes 20.00 No Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB)Drill Out Diameter (in) Comment PJSM. Blowed down top drive. R/U cement and bleeder hose. Pressure tested lines to 4,000 psi. Pumped 64 bbls of 13 ppg mud push at 4 bpm ( Pressure = 100-280 psi, F/O = 17%). Batch mixed cement. Dropped bottom plug. Pumped 214 bbls of 15.8 ppg tail cement ( Pressure = 320 psi, F/O = 16%). Dropped top plug. Pumped 20 bbls water. Displaced 663 bbls (6,580 strokes, FCP = 360 psi, F/O = 8%) w/ rig pumps to bump the plug and pressure up to 900 psi (for 5 minutes). B/O and checked floats. Cement was in place at 0810hr. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 12,850.0 15,294.0 1,036 G 1214.1 Yield (ft'/sack) Mix H2O Ratio (gai/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.06 15.80 160.3 6.18 Additives Additive Type Concentration Conc Unit label Page 1/1 Report Printed: 1/8/2020 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/9/2019 10/9/2019 1.50 MIRU MOVE RURD P Clean and secure cellar, raise up 0.0 0.0 06:00 07:30 outside stairs and landings. 10/9/2019 10/9/2019 2.00 MIRU MOVE RURD P Scope derrick in and secure/pin top 0.0 0.0 07:30 09:30 drive and prepare to layover. 10/9/2019 10/9/2019 0.75 MIRU MOVE RURD P Raise C-section and pin. SIMOPS- 0.0 0.0 09:30 10:15 unplug modules. 10/9/2019 10/9/2019 1.50 MIRU MOVE MOB P Prepare and skid rig floor. 0.0 0.0 10:15 11:45 10/9/2019 10/9/2019 0.25 MIRU MOVE MOB P Lower derrick. SIMOPS-Stomp motor 0.0 0.0 11:45 12:00 complex. 10/9/2019 10/9/2019 0.50 MIRU MOVE MOB P Continue to lower derrick. SI MOPS- 0.0 0.0 12:00 12:30 stomp motor complex. 10/9/2019 10/9/2019 2.50 MIRU MOVE MOB P Move pump, pits and casing modules, 0.0 0.0 12:30 15:00 get onto suspension and ready to hook-up to Peak trucks. Place modules to staging area. 10/9/2019 10/9/2019 3.00 MIRU MOVE MOB P Lay rig mats, raise cellar, unpin 0.0 0.0 15:00 18:00 pipeshed and move into place for truck. 10/9/2019 10/9/2019 1.50 MIRU MOVE MOB P Continue to move pipeshed into place 0.0 0.0 18:00 19:30 for truck hook-up. Move out of way of sub. 10/9/2019 10/9/2019 1.50 MIRU MOVE MOB P Stomp forward, turn stompers for 50ft 0.0 0.0 19:30 21:00 turn with sub off of well CD5-92 location for truck, install jeep. 10/9/2019 10/9/2019 0.50 MIRU MOVE MOB P Pull sub off mats at CD5-92 position 0.0 0.0 21:00 21:30 land position out of way.. 10/9/2019 10/9/2019 1.00 MIRU MOVE MOB P Move rig mats from CD5-92 to CD5- 0.0 0.0 21:30 22:30 26. 10/9/2019 10/10/2019 1.50 MIRU MOVE MOB P Move sub onto mats at CD5-26, 0.0 0.0 22:30 00:00 position with sow, remove jeep. 10/10/2019 10/10/2019 2.00 MIRU MOVE MOB P Stomp sub complex over well CD5- 0.0 0.0 00:00 02:00 26., square and level sub over well. SIMOPS-lay mats for pipeshed with two loaders, 10/10/2019 10/10/2019 1.00 MIRU MOVE MOB P Hook-up and position pipeshed with 0.0 0.0 02:00 03:00 truck. 10/10/2019 10/10/2019 1.00 MIRU MOVE MOB P Stomp pipeshed into position under 0.0 0.0 03:00 04:00 sub complex. SIMOPS - change valves in pits. 10/10/2019 10/10/2019 1.00 MIRU MOVE MOB P Continue stomp and changing 0.0 0.0 04:00 05:00 valves.Move pits with truck into position. Take -off truck and stomp into place with sub. 10/10/2019 10/10/2019 1.00 MIRU MOVE MOB P P/U pump module on truck and stage, 0.0 0.0 05:00 06:00 10/10/2019 10/10/2019 4.00 MIRU MOVE MOB P Continue to stomp and shim pipeshed 0.0 0.0 06:00 10:00 and pin to sub. 10/10/2019 10/10/2019 1.00 MIRU MOVE MOB P Square up, shim and spot pits to sub. 0.0 0.0 10:00 11:00 SIMOPS-move and shim casing module into place. 10/10/2019 10/10/2019 1.00 MIRU MOVE MOB P Square up and spot pump module to 0.0 0.0 11:00 12:00 pits. Simops-plug in pipeshed, pits to sub. 10/10/2019 10/10/2019 1.50 MIRU MOVE MOB P Square up and spot power module to 0.0 0.0 12:00 13:30 pump module. Simops-plug in pump to pits. Lower stairs around rig and address landings. 10/10/2019 10/10/2019 0.50 MIRU MOVE RURD P Raise derrick. SI MOPS -plug in power 0.0 0.0 13:30 14:00 module, start to make-up pit interconnect Page 1/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/10/2019 10/10/2019 0.50 MIRU MOVE RURD P Skid rig floor over well. 0.0 0.0 14:00 14:30 10/10/2019 10/10/2019 0.75 MIRU MOVE RURD P Raise upper and lower cattle chute. 0.0 0.0 14:30 15:15 SIMOPS-Plug in sub, turn on steam to sub. 10/10/2019 10/10/2019 0.75 MIRU MOVE RURD P Lower C-section. SIMOPS-plug in 0.0 0.0 15:15 16:00 derrick. 10/10/2019 10/10/2019 1.00 MIRU MOVE RURD P Lower cellar house and prepare to 0.0 0.0 16:00 17:00 scope up. Swap from moving gens to main Cat power per DDI electrician. 10/10/2019 10/10/2019 1.00 MIRU MOVE RURD P Scope derrick up and spot power 0.0 0.0 17:00 18:00 module. Hook up geronimo and derrick climber lines, M/U mud pits and pump room inter-connect lines, post permit to drill. 10/10/2019 10/10/2019 4.00 MIRU MOVE RURD P Remove bridle line and yokes, 0.0 0.0 18:00 22:00 connect derrick lights, hoop up kelly hose, install C.O.M., lower upper derrick ladder, hook up SRL's, SIMOPS-Load BHA, HWDP, DP into shed and strap 10/10/2019 10/11/2019 2.00 MIRU MOVE RURD P PU High pressure surface riser, make 0.0 0.0 22:00 00:00 up surface bag, install flow box, hook up hole fill and jet lines, load shed with 10 3/4" surface casing. 10/11/2019 10/11/2019 3.00 MIRU MOVE RURD P Tq up riser, set 90' MH, MU bell 0.0 0.0 00:00 03:00 nipple. SIMOPS, PU elevators, slips, BHA 10/11/2019 10/11/2019 3.00 MIRU MOVE PULD P PJSM, RIH and rack back HWDP/Jars 0.0 0.0 03:00 06:00 and DC's 10/11/2019 10/11/2019 2.00 MIRU MOVE BHAH P MU 13 1/2" Surface BHA#1 per DD, 0.0 115.0 06:00 08:00 scribe/orient MWD/UBHO 10/11/2019 10/11/2019 1.00 MIRU MOVE BHAH P MU 13 1/2" surface BHA#1 as per 115.0 115.0 08:00 09:00 Schlum DD. Conduct scribe/orient procedure. Verify offset put in correctly. 10/11/2019 10/11/2019 1.00 MIRU MOVE BHAH P Move drillcollar stand, jars and HWDP 115.0 115.0 09:00 10:00 stand from Drillers side to off drillers slide to accomodate wireline gyro rig- in. PU and RU Pollard witreline for gyro. 10/11/2019 10/11/2019 0.50 MIRU MOVE SFTY P Hold prespud meeting and AAR for rig 115.0 115.0 10:00 10:30 move. 10/11/2019 10/11/2019 0.25 MIRU MOVE SEQP P Fill conductor and riser, pressure test 115.0 115.0 10:30 10:45 mud lines to 3500psi. 10/11/2019 10/11/2019 0.25 MIRU MOVE CIRC P Establish circulation, tag base on 115.0 115.0 10:45 11:00 conductor, 350gpm, 280psi, 29%FO, 40rpm, 1-2K TQ, PU/SO=58K/66K, RTG=60K 10/11/2019 10/11/2019 1.00 SURFAC DRILL DDRL P Spud and drill 13 1/2" surface hole 115.0 184.0 11:00 12:00 from 116-184'MD. 450gpm, 574psi, 76% FO, 40rpm, 2-4K TQ, 5K WOB, PU/SO=58K/66K, RTG=60K, AST=O, ART=0.55, ADT=0.55, Total Bit Hrs=0.55, Total Jars=64.21, no losses for tour. 10/11/2019 10/11/2019 3.25 SURFAC DRILL DDRL P Continue drill 13 1/2" surface hole 184.0 370.0 12:00 15:15 from 184'-370'MD. 550gpm, 903psi, 79% FO, 40rpm, 2-4K TQ, 5K WOB, PU/SO=70K/66K, RTG=62K, AST=O, ART= 1.3, ADT=1.3, Total Bit Hrs=1.85, Total Jars=65.51, no losses for tour. Page 2/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/11/2019 10/11/2019 0.25 SURFAC DRILL OTHR P Swap rig to Hi -line power 184.0 370.0 15:15 15:30 10/11/2019 10/11/2019 2.50 SURFAC DRILL DDRL P Continue drilling 13 1/2" surface hole 370.0 595.0 15:30 18:00 from 370-595ft MD. 550gpm, 574psi, 78% FO, 40rpm, 2-4K TQ, 5K WOB, PU/SO=71 K/68K, RTG=62K, AST=O, ART=1.3, ADT=1.3, Total Bit Hrs=1.85, Total Jars=65.51, Gyro confirmation survey at 468.34'MD 10/11/2019 10/12/2019 6.00 SURFAC DRILL DDRL P Continue drilling 13 1/2" surface hole 595.0 1,039.0 18:00 00:00 from 595-1039ft MD. 550gpm, 550psi, 78% FO, 50rpm, 2-4K TQ, 5-7K WOB, PU/SO=74K/82K, RTG=74K, AST=1.07, ART=2.32, ADT=3.39, Total Bit Hrs=7.94, Total Jars=71.60, Gyro confirmation survey at 751ft, 940ft. 10/12/2019 10/12/2019 6.00 SURFAC DRILL DDRL P Continue drilling 13 1/2" surface hole 1,039.0 1,507.0 00:00 06:00 from 1039'-1507' MD. 600gpm, 1196psi, 80% FO, 50rpm, 3K TQ, 5-8K WOB, PU/SO=87K/94K, RTG=88K, AST=1.33, ART=2.13, ADT=3.46, Total Bit Hrs=11.40, Total Jars=75.06, Gyro survey at 1319'MD. 10/12/2019 10/12/2019 6.00 SURFAC DRILL DDRL P Continue drilling 13 1/2" surface hole 1,507.0 2,000.0 06:00 12:00 from 1507'-2000' MD. 800gpm, 1830psi, 24% FO, 50rpm, 5K TQ, 8K WOB, PU/SO=100K/103K, RTG=104K, pump 2 x 20bbl nutplug sweeps, AST=1.42, ART=2.75, ADT=4.17, Total Bit Hrs=15.57, Total Jars=79.23, 10/12/2019 10/12/2019 3.25 SURFAC DRILL DDRL P Continue drilling 13 1/2" surface hole 2,000.0 2,252.0 12:00 15:15 from 2000'-2252'MD, 21907VD. 800gpm, 1895psi, 24% FO, 50rpm, 5K TQ, 13K WOB, PU/SO=101K/103K, RTG=104K, AST=0.70, ART=1.61, ADT=2.31, Total Bit Hrs=17.88, Total Jars=81.54, Dump and dilute @2100' MD, 40bbl NP sweep at 2194'MD, shoot final survey as per Schlum DD. 10/12/2019 10/12/2019 0.50 SURFAC CASING CIRC P Circulate BUx1 while standing back 1 2,152.0 2,167.0 15:15 15:45 std from 2152' to 2167'MD at 800gpm, 2175psi, 24%FO, 40rpm, 5K tq, RTG WT=100k, total strokes pumped =3419 Stks 10/12/2019 10/12/2019 0.25 SURFAC CASING SRVY P Drop battery Gyro 2,167.0 2,167.0 15:45 16:00 as per Gyrodata. Let fall for 5 min and perform quadrant check as per Gyrodata. 10/12/2019 10/12/2019 1.50 SURFAC CASINGCIRC P Continue to circ BUx3 while standing 2,167.0 1,887.0 16:00 17:30 back std for each BU. from 2167" to 1887'MD. at 800gpm, 2300psi, 42% FO, 40rpm, 5K tq, RTG wt= 100k 10/12/2019 10/12/2019 0.50 SURFAC CASING OWFF P OWFF for 30min, dropping. 1,887.0 1,887.0 17:30 18:00 Page 3/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/12/2019 10/12/2019 2.50 SURFAC CASING TRIP P Blow down jet line and line up hole fill. 1,887.0 568.0 18:00 20:30 POOH on elevators from 1887'- 1165'MD. Rack back 5" HWDP and jar stand. PU/SP=105k/94K at 1800'. Experienced 15K overpull POOH at 25fpm. Maintain constant hole fill over the top. Manual strap every 5 stands. 10/12/2019 10/12/2019 2.25 SURFAC CASING BHAH P LD Schlum BHA#1 as per DD. Broke 568.0 96.0 20:30 22:45 apart collar to remove stuck Gyro tool. Found tool lower than planned as it passed thru UBHO. Broke apart BHA subs to remove Gyrodata tool from UBHO sub. LD Gyrodata tool to ground. 10/12/2019 10/13/2019 1.25 SURFAC CASING BHAH P Conitnue lay down BHA and bit. 96.0 0.0 22:45 00:00 10/13/2019 10/13/2019 2.00 SURFAC CASING RURD P Clean rig floor and remove BHA subs. 0.0 0.0 00:00 02:00 Build DC stand from drilling configuration. PU Doyon and rig up Volant tool to run 10 3/4" casing. 10/13/2019 10/13/2019 4.00 SURFAC CASING PUTB P Make-up 10.75", L-80 shoe trac assbly 0.0 845.0 02:00 06:00 as per Doyon Casing rep, Bakerloking all connections. MU torque=27k ft -lbs. Checked floats, OK. Continue running 10.75", L-80, TXPM, 45.5ppf casing from surface to 845'MD. installed centralizers as per detail. Using Volant CRT, MU torque=27k ft -lbs, PU/SO wt=71k/73k at 800ftMD. Filled casing on the fly and topped off every 10 jts. 10/13/2019 10/13/2019 1.25 SURFAC CASING PUTB P Continue running 10.75", L-80, 845.0 1,151.0 06:00 07:15 TXPM, 45.5ppf casing from 845'- 1151'MD. installed centralizers as per detail. Using Volant CRT, MU torque=27k ft -lbs,. Filled casing on the fly and topped off every 10 jts. SO wt=80k 10/13/2019 10/13/2019 2.25 SURFAC CASING PUTB P Establish circulation and pump down 1,151.0 1,496.0 07:15 09:30 hole while running in from 1151' to 1496'MD. Using Volant CRT, pump rate=2 bpm, 150psi, FO=80%. Total strokes pumped=9389stks (939bbls). SO wt=80K 10/13/2019 10/13/2019 0.50 SURFAC CASING CIRC P CBU below permafrost and stage up 1,496.0 1,536.0 09:30 10:00 pumps to 7bpm.from 1496' to 1596'MD. Pumped 1441stks, 7bpm, 197psi, 56% FO, SO wt=78K. 10/13/2019 10/13/2019 2.00 SURFAC CASING PUTB P Continue running 10.75", L-80, 1,536.0 2,085.0 10:00 12:00 TXPM, 45.5ppf casing from 1536'- 2085'MD. installed centralizers as per detail. Using Volant CRT, MU torque=27k ft -lbs,. Filled casing on the fly and topped off every 10 jts. SO wt=80k. Losses for tour=18bbls. 10/13/2019 10/13/2019 1.00 SURFAC CASING PUTB P Continue running 10.75", L-80, 2,085.0 2,240.0 12:00 13:00 TXPM, 45.5ppf casing from 2085'- 2240'MD. installed centralizers as per detail. Using Volant CRT, MU torque=27k ft -lbs,. Filled casing on the fly and topped off every 10 jts. SO wt=80k. PU and MU xover joint, hanger and landing joint per FMC/DDI reps. PU/SO wts=121 K/100K. Page 4/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/13/2019 10/13/2019 1.75 SURFAC CEMENT CIRC P Establish circulation to condition mud 2,240.0 2,240.0 13:00 14:45 for surface casing cement job while reciprocating. Staging up pump rate upmaintaining 10ppg, YP=18-25, ICP=235psi, 1.5bpm, FCP=97psi, 7bpm, FO=44% 10/13/2019 10/13/2019 0.50 SURFAC CEMENT CMNT P SD, rig up cement line to Volant 2,240.0 2,240.0 14:45 15:15 swivel. 10/13/2019 10/13/2019 0.50 SURFAC CEMENT CIRC P Re-establish circulation thru cement 2,240.0 2,240.0 15:15 15:45 line and continue to condition mud at 7bpm while reciprocating. Held PJSM, surfce cement job, total strokes pumped 7116 (711 bbls). 10/13/2019 10/13/2019 2.25 SURFAC CEMENT CMNT P Pump surface cement job as per 2,240.0 2,240.0 15:45 18:00 Schlum/CPAI detail. PU/SO wt=127K/120K, 10/13/2019 10/13/2019 1.00 SURFAC CEMENT CMNT P Continue to pump surface cement as 2,240.0 2,240.0 18:00 19:00 per Schlum detail. PU/SO wt=124K/100K. Bumped plug @1849 strokes at 3bpm w/515psi over final displacement pressure to1000psi, held for 5 minutes. Total pumped 1854stks, rigged down cement hose and checked floats, Floats held.. 10/13/2019 10/13/2019 1.00 SURFAC CEMENT WWWH P Flushed surface lines, HP riser, cycled 2,240.0 2,240.0 19:00 20:00 annular and fluided past with fluid. Pumped thru injection line on lower spool with black water @ 5bpm. Continued cleaning cement from pits, through cuttings tank, Eddy pump. Cycled annular preventer and rinsed clean. 10/13/2019 10/13/2019 1.00 SURFAC CEMENT RURD P Rigged down casing equipment. 2,240.0 2,240.0 20:00 21:00 Cleaned out and LD Volant tool. LD casing equipment and backed out landing joint as per FMC rep. 10/13/2019 10/13/2019 1.00 SURFAC CEMENT WWWH P Drained riser and cleaned out cement 2,240.0 2,240.0 21:00 22:00 from annular preventer, 4" conductor valves and cellar box. 10/13/2019 10/14/2019 2.00 SURFAC CEMENT NUND P Remove bell nipple, annular preventer 2,240.0 2,240.0 22:00 00:00 and high pressure riser. 10/14/2019 10/14/2019 3.25 SURFAC CEMENT NUND P ND Tee and slip lok adapter flange as 2,240.0 2,240.0 00:00 03:15 per FMC. Cleaned flange and layed down. Performed Halliburton Epoxy Cement Cemlok cap job as per HES rep and procedure. SIMOPS-grease choke manifold, clean rig floor cemenmting valves,removed wellside side valves for installtion. 10/14/2019 10/14/2019 1.00 SURFAC WHDBOP NUND P Nipple up FMC Gen 5 Unihead starter 2,240.0 2,240.0 03:15 04:15 and tubing head sections wellhead as per FMC rep. Tested lower wellhead seals to 1,000psi, witnessed by CPAI. 10/14/2019 10/14/2019 1.75 SURFAC WHDBOP NUND P NU high pressure riser and adapter 2,240.0 2,240.0 04:15 06:00 flange. 10/14/2019 10/14/2019 5.75 SURFAC WHDBOP NUND P Contine to NU riser and flange with 2,240.0 2,240.0 06:00 11:45 Sweeny wrench. NU BOPE, MU choke and kill lines, MU flowbox and flowline, RU MPD equipment. SI MOPS - gather elevations, RU to perform Wellworc bias testing and MPD test. Page 5/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (WB) 10/14/2019 10/14/2019 0.25 SURFAC WHDBOP NUND P Flood line, BOP, MPD skid with water 2,240.0 2,240.0 11:45 12:00 and purge. 10/14/2019 10/14/2019 1.50 SURFAC WHDBOP MPDA P Perform Wellworc Bias testsing thru 2,240.0 2,240.0 12:00 13:30 MPD sustem as per MPD rep. 10/14/2019 10/14/2019 1.00 SURFAC WHDBOP RURD P Pull MPD test cap, install trip nipple, 2,240.0 2,240.0 13:30 14:30 RU to test BOPE. BOP test waived by AGOCC, Lou Laubenstein, 06:14 10/14/2019. All test charts are to be submitted with test reports. AOGCC has a must catch for the next test cycle (60days max allowable). 10/14/2019 10/14/2019 5.50 SURFAC WHDBOP BOPE P Test BOPE. All tests 250psi 2,240.0 2,240.0 14:30 20:00 low/3500psi high for 5 charted minutes with exception of manual operated and super chokes tested to 250/2000psi for 5 charted minutes. Using 5" test jt, test annular, 2 7/8" x 5 1/2" UPR, 2 7/8" x 5 1/2" LPR. Test choke valves 1-15, manual operated and super choke, choke and kill manuals and HCR's, 4" valve on kill line, Blind/shear rams, 5" TIW #1 and #2, 5" dart, upper and lower IBOP. Perform Koomey drawdown, ACC=2950psi, Manifold=1500psi, ACCU=1600psi after all functions on just bottles. 15 secs to 200psi build with 1 electric pump, 101 secs to build to full system pressure with 2 electric and 2 air pumps. Closing times, annular=23secs, UPR=18secs, blind/shears=16secs, LPR=16sec, Choke HCR=2 sec, kill HCR=2sec. 10/14/2019 10/14/2019 0.50 SURFAC WHDBOP RURD P Rig down test equipment, blow down 2,240.0 2,240.0 20:00 20:30 choke line, kill line, top drive 10/14/2019 10/14/2019 0.50 SURFAC WHDBOP MPSP P Pull test plug and install 10" long wear 2,240.0 2,240.0 20:30 21:00 ring. Run in LDS. 10/14/2019 10/14/2019 1.00 SURFAC DRILLOUT BHAH P PU Schlum tools for BHA#2. 2,240.0 2,240.0 21:00 22:00 10/14/2019 10/15/2019 2.00 SURFAC DRILLOUT BHAH P PU BHA#2 as per Schlum DD. Gauge 2,240.0 2,240.0 22:00 00:00 all stabs and install floats as per DD. Maintain constant hole fill over the top and strap pits at start and end of BHA. SIMOPS-pressure test MPD equipment in BOP deck. 10/15/2019 10/15/2019 1.50 SURFAC DRILLOUT BHAH P Continue to PU BHA#2 from 127' to 2,240.0 2,240.0 00:00 01:30 605'MD as per SChlum DD. Gauge all stabsand install floats as per DD. Maintain constant hole fill over the top and strap trip pit at drill collars and HWDP. PU/SC=65K/65K at 700'MD. 10/15/2019 10/15/2019 1.00 SURFAC DRILLOUT TRIP P Trip in hole with 5" drillpipe from 2,240.0 2,240.0 01:30 02:30 derrick @ 100 fpm from 605' to 2017'. Maintained constant hole fill and manual strapped every 5 stands. 10/15/2019 10/15/2019 1.00 SURFAC DRILLOUT SEQP P Perform Schlum shallow test as per 2,240.0 2,240.0 02:30 03:30 DD at 2015'MD. Pumped at 650gpm, 1425psi. Circulated 1 bottoms up at 600gpm. PU/SO=99K/97K. 10/15/2019 10/15/2019 0.50 SURFAC DRILLOUT PRTS P Blow down top drive and hole fill line. 2,240.0 2,240.0 03:30 04:00 Rigged up to test casing. Flush lines and rig up sensator to OA flange. Test surface lines. Bleed air out of system Page 6/51 Report Printed: 12/31/2019 - Operations Summary (with Timelog Depths) s s� CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftK8) 10/15/2019 10/15/2019 1.00 SURFAC DRILLOUT PRTS P Perform casing test to 3500psi/30 2,240.0 2,240.0 04:00 05:00 minutes@2015' @ 2015'MD as per CPAI rep. Charted and witnessed. Bled off volume to closed pit. Record volumes and open up wellbore. Blow down kill line and rig down casing test equipment. 10/15/2019 10/15/2019 1.00 SURFAC DRILLOUT COCF P Wash and ream down to plugs/float 2,240.0 2,240.0 05:00 06:00 collar. Found cement at 2163'MD. Establish drilling rate as per Schlum DD. 600gpm/1445psi, TQ off=3-4K, TQ on=3.5K, PU/SO=1 08K/1 03K. 10/15/2019 10/15/2019 6.00 SURFAC DRILLOUT DRLG P Drill out wiper plugs and float 2,240.0 2,240.0 06:00 12:00 collar/shoe tack and rathole as per DD from 2163'MD to 2240' MD (shoe), 650gpm, 1445psi, 30-40rpm, 3-4K tq, 1 Ok WOB, RTG wt=105K, 10/15/2019 10/15/2019 0.50 SURFAC DRILLOUT DDRL P Cleaned rathole to 2252' and drilled 2,252.0 2,272.0 12:00 12:30 20 ft of new hole to 2272'MD, 650 gpm, 1445psi, 30-40rpm, 3-4K TQ, 10 -20K WOB, RTG WT=105K displacing to 9.6ppg LSND on the fly. 10/15/2019 10/15/2019 0.50 SURFAC DRILLOUT DISP P Continue to displace to 9.6 ppg LSND 2,272.0 2,272.0 12:30 13:00 mud until even in/out while rotating and reciprocating from 2271'MD to 2239'MD with 650gpm, 1073psi, FO=32%, RPM=80, TQ off=3K, PU/SO= 1 08K/1 03K, RTG wt=105K, rtg tq=3K, total pumped=4559 strokes (456bbls). 10/15/2019 10/15/2019 0.50 SURFAC DRILLOUT TRIP P Pull back into casing racking back one 2,272.0 2,272.0 13:00 13:30 stand PU Wt=108k, OWFF, Static 10/15/2019 10/15/2019 0.25 SURFAC DRILLOUT FIT P Rig up to conduct F.I.T test. 2,272.0 2,272.0 13:30 13:45 10/15/2019 10/15/2019 1.00 SURFAC DRILLOUT FIT P Perform F.I.T. test to 1050psi charted. 2,272.0 2,272.0 13:45 14:45 Rig out test equipment and lines. Calculated F.I.T.=18.9 ppg with 9.6ppg mud. 10/15/2019 10/15/2019 1.50 INTRM1 DRILL DDRL P RIH one stand to bottom and drill 9 2,272.0 2,390.0 14:45 16:15 7/8" hole from 2272' to 2390'MD, (2179'TVD), 700 gpm, 1275psi, 34% FO, 100 rpm, 6K WOB, off bottom 1257psi, PU/SO110k?109K. RTG=104K, 2K TQ. 10/15/2019 10/15/2019 0.75 INTRM1 DRILL CIRC P Obtain baseline parameters and drop 2,390.0 2,390.0 16:15 17:00 underreamer opening ball as per Schlum DD, 50rpm, 2.5K tq, 1248psi, 700gpm, PU/SO=110k/109K. RTG wt=104K, pump down ball at 50spm, 56psi, 30rpm, 2K tq. Ball on seat at 167 strokes, inc pump rate as per Schlum DD to open reamer at 1252psi. Verified open against baseline parameters and pull/ledge test. 10/15/2019 10/15/2019 0.50 INTRM1 DRILL UREM P Ream down rest of std with reamer 2,390.0 2,390.0 17:00 17:30 open from 2269-2390'MD, 850gpm, 1297psi, 100RPM, 4K TQ. Page 7/51 Report Printed: 12/31/2019 - - Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/15/2019 10/15/2019 0.50 INTRM1 DRILL DDRL P Drlg 9 7/8"x11' intermediate hole with 2,390.0 2,452.0 17:30 18:00 underreamer from 2390'-2452'MD, 2366'TVD, 850gpm, 1074psi, 65% FO, 120rpm, 6K TQ, 1 OK WOB, PU/SO=110K/109K, RTG wt=104K, 3K TQ ADT=1.45, total bit hours=1.45, total jars=82.99 SPR's at 2994md (2227'TVD), MW=9.6ppg MP#1 - 30/40spm, 120/150psi MP#2 - 30/40spm, 120/150psi 10/15/2019 10/16/2019 6.00 INTRM1 DRILL DDRL P Drlg 9 7/8"x11' intermediate hole with 2,452.0 3,883.0 18:00 00:00 underreamer from 2455'-3308'MD, 3308'MD, 850gpm, 1740psi, 72% FO, 120rpm, 6K TQ, 1 OK WOB, PU/SO=1 1 9K/1 06K, RTG wt= 116K, 4K TQ ADT=1.45, total bit hours=1.45, total jars=82.99SPR's@5963'M D, 40787VD, 9.7ppg, 10/16/2019 10/16/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 3,308.0 3,883.0 00:00 06:00 underreamer from 3308'-3900'MD, 31837VD, 850gpm, 1900psi, 74% FO, 140rpm, 8K TQ, 10-12K WOB, off bttm=1897psi, PU/SO=120K/106K, RTG wt=117K, 4.5K TQ ADT=4.21, total bit hours=10.20, total jars=91.74 10/16/2019 10/16/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 3,900.0 4,763.0 06:00 12:00 underreamer from 3900'-4763'MD, 3563'TVD, 850gpm, 2417psi, 79% FO, 150rpm, 9K TQ, 26K WOB, off bttm=2390psi, PU/SO=135K/113K, RTG wt=125K, 4.5K TQ ADT=3.95, total bit hours=14.15, total jars=95.69 10/16/2019 10/16/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 4,763.0 5,594.0 12:00 18:00 underreamer from 4763'-5594'MD, 39157VD, 850gpm, 2297psi, 79% FO, 180rpm, 9K TQ, 26K WOB, ECD=11.01 ppg, Off Bttm=2100psi, PU/SO= 1 39K/1 24K, RTG wt= 126K, 5K TQ ADT=3.97, total bit hours=18.12, total jars=96.66 Page 8/51 Report Printed: 12/31/2019 - Operations Summary (with Timelog Depths) CD5-26 01.6 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/16/2019 10/17/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 5,597.0 6,720.0 18:00 00:00 underreamer from 5594'-6720'MD, 4410'TVD, 850gpm, 2475psi, 80% FO, 180rpm, 12K TQ, 15K WOB, ECD=11.01 ppg, Off Bttm=2460psi, PU/SO=141 K/1 22K, RTG wt= 127K, 4.5K TQ ADT=3.82, total bit hours=21.94, total jars=103.48hrs Pumped to/hi jamming sweep @6346'MD Dump and dilute @ 6600'MD w/ 9.2ppg LSND mud SPR's@5963'MD, 4078'TVD, 9.7ppg, 19:35hrs #1 MP - 20/30spm, 230/270psi MP#2 - 20/30spm - 225/265psi Tour Losses=0 10/17/2019 10/17/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 6,720.0 7,739.0 00:00 06:00 underreamer from 6720'-775OMD, 48647VD, 850gpm, 2471 psi, 78% FO, 180rpm, 14K TQ, 15K WOB, ECD=10.95ppg, Off Bttm=2450psi, PU/SO=165K/135K, RTG wt=144K, 10K TQ ADT=3.86, total bit hours=25.80, total jars=107.34hrs Pumped to/hi jamming sweep @6346'MD SPR's@7000'MD, 4582'TVD, 9.7+ppg, 19:35hrs #1 MP - 20/30spm, 230/270psi MP#2 - 20/30spm - 225/265psi Tour Losses=0 10/17/2019 10/17/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 7,739.0 8,761.0 06:00 12:00 underreamer from 7739'-8761'MD, 53047VD, 850gpm, 2172psi, 78% FO, 180rpm, 17.5K TQ, 22K WOB, ECD=11.03ppg, Off Bttm=2100psi, PU/SO=177K/134K, RTG wt=147K, 10K TQ ADT=3.5, total bit hours=29.3, total jars=110.84hrs Pumped to/hi jamming sweep @6346'MD Dump and dilute 280bbls@ 7945'MD Pump LO/HIGH sweeps at 8229' and 8508' Page 9/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/17/2019 10/17/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 8,761.0 10,017.0 12:00 18:00 underreamer from 8761'-10017'MD, 5850'TVD, 850gpm, 2572psi, 78% FO, 180rpm, 20K TQ, 24K WOB, ECD=11.07ppg, Off Bttm=2500psi, PU/SO=178K/162K, RTG wt=147K, 14K TQ ADT=3.72, total bit hours=33.02, Total jars=114.56hrs Dump and dilute 280bbls@ 9630'MD SPR's@7000'MD, 45827VD, 9.7+ppg, 19:35hrs #1 MP - 20/30spm, 230/270psi MP#2 - 20/30spm - 225/265psi Tour Losses=0 10/17/2019 10/18/2019 6.00 INTRMI DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 10,017.0 11,230.0 18:00 00:00 underreamer from 10017'-11230'MD, 6390 'TVD, 850gpm, 2675psi, 74% FO, 180rpm, 24K TQ, 23K WOB, ECD=11.01 ppg, Off Bttm=2500psi, PU/SO=202K/160K, RTG wt=172K, 15K TQ ADT=4.24, total bit hours=37.26, total jars=1 1 8.80hrs Dump and dilute 280bbls@ 10580'MD SPR's@7000'MD, 45827VD, 9.7+ppg, 19:35hrs #1 MP - 20/30spm, 230/270psi MP#2 - 20/30spm - 225/265psi Tour Losses=0 10/18/2019 10/18/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 11,230.0 11,970.0 00:00 06:00 underreamer from 11230'-11970'MD, 6712'TVD, 850gpm, 2610psi, 74% FO, 180rpm, 25K TQ, 23K WOB, ECD=10.73ppg, Off Bttm=1225psi at 550gpm, PU/SO=238K/148K, RTG wt=182K, 17K TQ ADT=4.11, total bit hours=41.37, total jars=122.91 hrs Pumped 20/20 to/hi vis anti -jamming sweep at 11335'MD Dump and dilute 550bbls@ 115200'MD Page 10/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/18/2019 10/18/2019 4.25 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 11,970.0 12,563.0 06:00 10:15 underreamer from 11970'-12563'MD, 6938'TVD, 850gpm, 2760psi, 74% FO, 180rpm, 26K TQ, 19K WOB, ECD=10.85ppg, Off Bttm=1278psi at 550gpm, PU/SO=244K/146K, RTG wt=186K, 19K TQ ADT=2.83, total bit hours=44.20, total jars=125.741 hrs 10/18/2019 10/18/2019 0.75 INTRM1 DRILL CIRC P Rotate and reciprocate bottoms up 12,563.0 12,563.0 10:15 11:00 @55spm @1200psi, RPM=160, 17K TQ, SIMOPS - PJSM on pulling trip nipple and installing RCD bearing. 10/18/2019 10/18/2019 0.50 INTRM1 DRILL OWFF P Blow down Top Drive and prepare to 12,563.0 12,563.0 11:00 11:30 install RCD bearing as per MPD rep. OWFF=static. 10/18/2019 10/18/2019 0.50 INTRM1 DRILL MPDA P Pull trip nipple and install RCD as per 12,563.0 12,563.0 11:30 12:00 MPD rep. Rotate pip@5rpm. Broke in RCD bearing for 5 mins @50rpm. Follow with 100rpm for 5 mins. Tour losses=0. 10/18/2019 10/18/2019 6.00 INTRMI DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 12,563.0 12,875.0 12:00 18:00 underreamer from 12563'-12875'MD, 71107VD, 850gpm, 3270psi, 65% FO, 160rpm, 26K TQ, 19K WOB, ECD=11.48ppg, Off Bttm=1675psi at 550gpm, PU/SO=266K/144K, RTG wt=182K, 21KTQ ADT=3.95, total bit hours=48.15, total jars=129.69hrs 10/18/2019 10/19/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 12,875.0 13,346.0 18:00 00:00 underreamer from 12876-13346'MD, 73157VD, 850gpm, 3407psi, 48% FO, 160rpm, 27K TQ, 16K WOB, ECD=11.64ppg, Off Bttm=1775psi at 550gpm, PU/SO=270K/150K, RTG wt=185K, 21KTQ ADT=4.55, total bit hours=52.70, total jars=134.241 hrs SPR's@12938'MD, 7138'TVD, 10.2ppg, 19:30hrs MP#1 - 20spm, 540/250psi(MPD), 30spm, 560/210psi(MPD) MP#2 - 20spm, 540/250psi(MPD). 30spm, 560/210psi(MPD) Tour Losses=0 Page 11/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/19/2019 10/19/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 13,346.0 13,693.0 00:00 06:00 Rhino underreamer from 13346'- 13693'MD, 7463'TVD, holding 375psi back pressure MPD with injection pump on connections, (11.5ppg MWE), 850gpm, 3637psi, 57% FO, 160rpm, 28K TQ, 18K WOB, ECD=11.67ppg, ADT=5.16, total bit hours=57.86, total jars=139.401 hrs Lubes and glass bead additions working well to keep torques manageable. 10/19/2019 10/19/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 13,693.0 14,072.0 06:00 12:00 Rhino underreamer from 13693'- 14072'MD, 7570'TVD, holding 375psi back pressure MPD with injection pump on connections, (11.5ppg MWE), 850gpm, 3387psi, 57% FO, 160rpm, 28K TQ, 28K WOB, ECD=11.67ppg, ADT=4.76, total bit hours=62.62, total jars=144.16hrs SPR's@14070'MD, 7570'TVD, 10.4+ppg, 11:500hrs MP#1 - 30spm, 680/265psi(MPD), 40spm, 680/245psi(MPD) MP#2 - 30spm, 270/270psi(MPD). 40spm, 680/250psi(MPD) 10/19/2019 10/19/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 14,072.0 14,380.0 12:00 18:00 Rhino underreamer from 14072'- 14380'MD, 7612'TVD, holding 375psi back pressure MPD with injection pump on connections, (11.5ppg MWE), 850gpm, 3703psi, 57% FO, 160rpm, 23K TQ, 25K WOB, ECD=11.57ppg, ADT=4.65, total bit hours=67.27, total jars=148.81 hrs 10/19/2019 10/20/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 14,380.0 14,683.0 18:00 00:00 Rhino underreamer from 14380'- 14683'MD, 76487VD, holding 375psi back pressure MPD with injection pump on connections, (11.5ppg MWE), 850gpm, 3560psi, 58% FO, 120-160rpm (some torque shocks observed in alternating lithology), 26K TQ, 25K WOB, ECD=11.54ppg, ADT=5.32, total bit hours=72.59, total jars=154.13hrs No losses last 24 hours No PU and SO weights recorded through the shale sections. Page 12/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/20/2019 10/20/2019 6.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 14,463.0 15,145.0 00:00 06:00 Rhino underreamer from 14683'- 15145' MD, 7698'TVD, holding 375psi back pressure MPD with injection pump on connections, (11.5ppg MWE), 850gpm, 3820psi, 51% FO, 120rpm, 27K TQ, 24K WOB, ECD=11.56ppg, ADT=4.82, total bit hours=77.41, total jars=158.95hrs No PU and SO weights recorded through the shale sections. 10/20/2019 10/20/2019 2.00 INTRM1 DRILL DDRL P RWD 9 7/8"x11" intermediate hole with 15,145.0 15,294.0 06:00 08:00 Rhino underreamer from 15145'- 15294' MD, 7714'TVD, FINAL INT TD, holding 375psi back pressure MPD with injection pump on connections, (11.5ppg MWE), 850gpm, 3940psi, 51 % FO, 120rpm, 27K TQ, 24K WOB, TQ=20K off bttm, ECD=11.57ppg, ADT=1.86, total bit hours=79.27, total jars=160.81 hrs No PU and SO weights recorded through the shale sections. 10/20/2019 10/20/2019 4.00 INTRM1 CASING CIRC P CBU x 4, rack back stand after 1 BU 15,294.0 15,110.0 08:00 12:00 after reciprocating 15294'- 15, 11OVD. weight up to 10.8ppg, rpm= 160, tq=23k, gpm=850, psi=3940 10/20/2019 10/20/2019 2.00 INTRM1 CASING CIRC P Continue to circ 4xBU, R/B stand after 15,110.0 15,110.0 12:00 14:00 reciprocating 15191' to 15110', MW=10.8ppg, rpm=160, TQ=23K, GPM=850, psi=3940 10/20/2019 10/20/2019 4.00 INTRM1 CASING BKRM P BROOH from 15110'-14067"MD, 15,110.0 14,067.0 14:00 18:00 gpm=800, psi=3560, rpm= 150, tq=19- 20K, FP=61%, ECD=11.89ppg, RTG WT=186K 10/20/2019 10/21/2019 6.00 INTRM1 CASING BKRM P BROOH from 14067'-13594'MD, 14,067.0 13,594.0 18:00 00:00 gpm=775, psi=3420, rpm=125, tq=19- 22K, pulling at 225fph„ FO=61 %, ECD=11.92ppg, RTG WT=178K Encountered tight spot/pack-off @ 14073'MD. Tour Losses = 205bbls (123 bbls est. loss at 14073'MD) 10/21/2019 10/21/2019 6.00 INTRM1 CASING BKRM P BROOH F/ 13,594' MD - T/ 13,121` 13,594.0 13,121.0 00:00 06:00 MD, W/ GPM = 775, PSI = 3375, RPM = 160TQ = 22K. F/O = 60%, ECD = 12.0 PPG, RT WT = 180K 10/21/2019 10/21/2019 6.00 INTRM1 CASING BKRM P BROOH F/ 13,121' MD - T/ 12,648' 13,121.0 12,648.0 06:00 12:00 MD, W/ GPM = 800, PSI = 3102, RPM = 160, TQ = 19-20K. F/O = 50%, ECD = 11.91 PPG, RT WT = 176K Page 13151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/21/2019 10/21/2019 4.75 INTRM1 CASING CIRC P CBU X 4 Racking back a stand each 2 12,648.0 12,552.0 12:00 16:45 B/U, Pump High Vis Nut Plug & High Vis High Density sweeps, F/ 12,648'MD T/ 12,552'MD, GPM = 800, PSI = 3120, RPM = 160, TQ = 16.5K. F/O = 65%, ECD = 11.98PPG, 10/21/2019 10/21/2019 1.00 INTRM1 CASING CIRC P Drop ball (DIA.1.65) to close Rhino 12,552.0 12,552.0 16:45 17:45 reamer as per SLB rep. Parameters before, 700 gpm @ 2525, 50 rpm @ 16.5k Tq. P/U=178K, S/O=170K, ROT= 175K, TRPM=2343, After ball seat @1772 STKS, 360 PSI increase sheared @235 GPM, PSI=2100, 700 GPM, TRPM=2890, 10/21/2019 10/21/2019 0.25 INTRM1 CASING SMPD T B/D Top drive, attempt to SOOH on 12,552.0 12,552.0 17:45 18:00 elevators @ 12,552' MD. Observed 45k overpull repeated. 10/21/2019 10/21/2019 0.50 INTRM1 CASING SMPD T Continue attempt to SOOH from 12,552.0 12,525.0 18:00 18:30 12,552' MD to 12,525' MD with 50k OP, unsuccessful. 10/21/2019 10/22/2019 5.50 INTRM1 CASING BKRM P M/U to top drive and backream out @ 12,525.0 11,910.0 18:30 00:00 130 fph from 12,525' MD to 11,910' MD. 650 gpm @ 2424 psi, 160 rpm 18 -22k Tq. Maintagin ECD below 11.9 ppg, ROT wt= 165k. Tour Losses=0 bbls 10/22/2019 10/22/2019 6.00 INTRM1 CASING BKRM P BROOH from 11,910' MD to 11,465' 11,910.0 11,465.0 00:00 06:00 MD w/ GPM = 650 gpm, SPP = 2440 psi, Rotary = 160 rpm, TQ = 17-24 kftlbs, F/O = 32%, ECD =11.86 ppg, and RT Wt = 160 klbs. 10/22/2019 10/22/2019 0.75 INTRM1 CASING BKRM P BROOH from 11,465' MD to 11,420' 11,465.0 11,420.0 06:00 06:45 MD w/ GPM = 650 gpm, SPP = 2440 psi, Rotary = 160 rpm, TQ = 17-24 kftlbs, F/O = 32%, ECD =11.86 ppg, and RT Wt = 160 klbs. 10/22/2019 10/22/2019 2.25 INTRM1 CASING CIRC P CBU 2X. Pumped 80 bbls HVNP 11,420.0 11,420.0 06:45 09:00 sweep and diution. Rotated and reciprocated. GPM - 640 gpm, SPP = 2,264 psi, Rotary = 160 gpm, and TQ = 13-15 kftlbs. 10/22/2019 10/22/2019 1.00 INTRM1 CASING SMPD T Attempted to SOOH on elevators. 11,420.0 11,420.0 09:00 10:00 Observed 50 klbs OP. Attempted to work through 5 X. Observed 50 klbs OP each time. 10/22/2019 10/22/2019 2.00 INTRM1 CASING PMPO P Pumped out of hole from 11,420' MD 11,420.0 10,852.0 10:00 12:00 to 10,852' MD w/ 5" DP/ Racked back in derrick. GPM = 645 gpm, SPP = 2,320 psi, P/U Wt = 228 klbs, S/O Wt = 118 klbs, Monitored displacement on pits 2-4. B/D T/D. 10/22/2019 10/22/2019 6.00 INTRM1 CASING SMPD P SOOH on elevators w/ MPD from 10,852.0 7,363.0 12:00 18:00 10,852' MD to 7,363' MD. B/P in slips = 190 psi, B/P out of slips = 340 psi. P/U Wt = 171 klbs, S/O Wt = 116 klbs, Monitored displacement on pits 2-4. 10/22/2019 10/22/2019 1.00 INTRM1 CASING SMPD P SOOH on elevators w/ MPD from 7,363.0 6,970.0 18:00 19:00 7,363' MD to 6,970' MD. B/P in slips = 185 psi, B/P out of slips = 330 psi. Monitored displacement on pits 1-4. Page 14151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (MB) 10/22/2019 10/22/2019 1.00 INTRM1 CASING CIRC P Circulated, rotated and reciprocated 6,970.0 6,970.0 19:00 20:00 from 7,041' MD to 6,970' MD w/ GPM = 675 gpm, SPP = 2,065 ps, F/O = 40%, Rotary = 160 rpm, and TQ = 10 - 27 kftlbs to breakover. ECD = 11.7 ppg, RT Wt = 130 kibs, Total Strokes = 8000. 10/22/2019 10/23/2019 4.00 INTRM1 CASING BKRM P BROOH from 6970' MD to 6,303' MD 6,970.0 6,303.0 20:00 00:00 w/ GPM = 675 gpm, SPP = 1,950 psi, Rotary = 160 rpm, TQ = 8-12 kftlbs, F/O = 51 %, ECD = 11.76 ppg, and Rot Wt = 126 klbs. 10/23/2019 10/23/2019 3.00 INTRMI CASING BKRM P BROOH from 6,303' MD to 5,691' MD 6,303.0 5,691.0 00:00 03:00 w/ GPM = 675 gpm, SPP = 1,900 psi, Rotary = 160 rpm, TQ = 8-12 kftlbs, F/O = 51 %, ECD = 11.76 ppg, and Rot Wt = 122 klbs. 10/23/2019 10/23/2019 1.75 INTRM1 CASING CIRC P Circulated, rotated and reciprocated 5,691.0 5,691.0 03:00 04:45 from 5,691' MD to 5,740' MD w/ GPM = 675 gpm, SPP = 1,670 ps, F/O = 52%, Rotary = 160 rpm, and TQ = 8 kftlbs. ECD = 11.68 ppg, and RT Wt = 120 klbs. Pumped 40 bbis H.V. Nut plug sweep and 40 bbls weighted nut plug sweeps w/ no observed increase in cuttings returned. Total pumped strokes = 13,000. SIMOPS: L/D 16 stands of 5" DP off line. 10/23/2019 10/23/2019 1.25 INTRM1 CASING SMPD P Blowed down top drive. SOOH from 5,691.0 5,105.0 04:45 06:00 5,691' MD to 5,105' MD w/ 5" DP and racked back in derrick. P/U Wt = 99 klbs, S/O Wt = 94 klbs, Monitored displacement on pits 3-4. 10/23/2019 10/23/2019 4.00 INTRM1 CASING SMPD P SOOH on elevators w/ MPD from 5,105.0 2,162.0 06:00 10:00 5,105' MD to 2,162' MD. B/P in slips = 175 psi, B/P out of slips = 340 psi. P/U Wt = 99 klbs, S/O Wt = 94 klbs. Monitored displacement on pits 3-4. 10/23/2019 10/23/2019 1.50 INTRM1 CASING CIRC P CBU 2X. Pumped 40 bbls HVNP and 2,162.0 2,162.0 10:00 11:30 70 bbls HVNP sweeps. GPM = 580 gpm, SPP = 1,295 ps, Rotary = 60 rpm, and TQ = 3 kftlbs. 10/23/2019 10/23/2019 0.50 INTRM1 CASING OWFF P OWFF (Static). 2,162.0 2,162.0 11:30 12:00 10/23/2019 10/23/2019 0.75 INTRMI CASING SMPD P SOOH on elevators w/ MPD from 2,162.0 1,000.0 12:00 12:45 2,162' MD to 1,000' MD. B/P in slips = 175 psi, B/P out of slips = 340 psi. P/U Wt = 86 klbs, S/O Wt = 91 klbs. Monitored displacement on pits 3-4. 10/23/2019 10/23/2019 1.00 INTRM1 CASING MPDA P PJSM. Pulled MPD bearing and 1,000.0 1'000-0- 12:45 13:45 installed trip nipple. 10/23/2019 10/23/2019 0.25 INTRM1 CASING TRIP P POOH on elevators from 1,000' MD to 1,000.0 605.0 13:45 14:00 605' MD w/ 5" DP racked back in derrick. P/U Wt = 71 kfbs, S/O Wt = 81 klbs. Monitored displacement on pit 3. 10/23/2019 10/23/2019 4.00 INTRM1 CASING BHAH P PJSM. L/D BHAfrom 605' MD to 605.0 0.0 14:00 18:00 surface. Monitored displacement on pit 3. 10/23/2019 10/23/2019 1.00 INTRMI CASING BHAH P Cleaned and cleared rig floor. Laid 0.0 0.0 18:00 19:00 down remaining BHA components. 10/23/2019 10/23/2019 0.50 INTRM1 CASING WWWH P Flushed BOP stack at 7 bpm w/ 85 psi 0.0 0.0 19:00 19:30 from ground level to annular preventers. Page 15/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/23/2019 10/23/2019 1.00 INTRM1 CASING BOPE P Blowed down top drive and hole fill 0.0 0.0 19:30 20:30 line. Pumped out BOP stack and retrieved 10" Wear ring. Built 7 5/8" test joint and installed upper test plug. 10/23/2019 10/23/2019 1.00 INTRM1 CASING BOPE P Closed blind rams and bled down 0.0 0.0 20:30 21:30 Koomey. C/O upper VBRs for 7.625" straight body rams. Energized Koomey. 10/23/2019 10/23/2019 1.75 INTRM1 CASING BOPE P Rigged up to test Annular and UPR on 0.0 0.0 21:30 23:15 7.625" test joint. Tested annular to 250 psi/2500 psi (Passed). Tested UPR to 250 psi/3500 psi (Passed). Rigged down testing equipmen. Blow down. Broke down 7.625" test joint. Cleaned and cleared rig floor. 10/23/2019 10/24/2019 0.75 INTRM1 CASING SLPC P Hung the block and rigged up to slip 0.0 0.0 23:15 00:00 and cut drill line. 10/24/2019 10/24/2019 1.25 INTRM1 CASING SLPC P Slipped and cut 110' of drill line. 0.0 0.0 00:00 01:15 Unhung blocks. Calibrated Amphion/Totco, Checked Crown-o- matic. Cleared and cleaned up tools. 10/24/2019 10/24/2019 1.25 INTRM1 CASING RURD P R/U casing running equipment. 0.0 0.0 01:15 02:30 Torqued Volant to Top Drive to 37 kftlbs. 10/24/2019 10/24/2019 3.50 INTRM1 CASING PUTB P P/U 7 5/8" 39 ppf TXP from surface to 0.0 922.0 02:30 06:00 922' MD. M/U, Baker locked, and torqued shoe track to 26.1 klbs. Checked floats. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 67 klbs, and S/O Wt = 72 klbs at 850' MD. 10/24/2019 10/24/2019 6.00 INTRM1 CASING PUTB P RIH w/ 7 5/8" 39 ppf TXP casing from 922.0 3,340.0 06:00 12:00 922' MD to 3,340' MD. MUT = 26.1 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 134 klbs, and S/O Wt = 133 klbs. 10/24/2019 10/24/2019 3.25 INTRM1 CASING PUTB P RIH w/ 7 5/8" 39 ppf TXP casing from 3,340.0 4,992.0 12:00 15:15 3,340' MD to 4,992' MD. MUT = 26.1 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 170 klbs, and S/O Wt = 140 klbs. 10/24/2019 10/24/2019 0.50 INTRMI CASING RURD P PJSM. Changed out cup and stabbing 4,992.0 4,992.0 15:15 15:45 head on CRT. 10/24/2019 10/24/2019 1.75 INTRM1 CASING PUTB P RIH w/ 7 5/8" 39 ppf TXP casing from 4,992.0 5,784.0 15:45 17:30 4,992' MD to 5,784' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 184 klbs, and S/O Wt = 136 klbs. 10/24/2019 10/24/2019 0.50 INTRM1 CASING CIRC P CBU. Staging up to 6 bpm. SPP = 316 5,784.0 5,784.0 17:30 18:00 psi. Initial loss rate was 40 bph. 10/24/2019 10/24/2019 1.00 INTRM1 CASING CIRC P Continued circulating at 6 bpm. w/ ICP 5,784.0 5,784.0 18.00 19:00 = 385 psi and FCP = 320 psi. Pumped 5,800 strokes. Pumped until mud was 10.9 ppg in and out. P/U Wt = 176 klbs, and S/O Wt = 138 klbs. Page 16/51 Report Printed: 12/31/2019 -- Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (MB) End Depth (ftKB) 10/24/2019 10/25/2019 5.00 INTRM1 CASING PUTB P RIH w/ 7 5/8" 39 ppf TXP casing from 5,784.0 8,300.0 19:00 00:00 5,784' MD to 8,300' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 246 klbs, and S/O Wt = 140 klbs @ 8,000' MD. 10/25/2019 10/25/2019 2.25 INTRM1 CASING PUTB P RIH w/ 7 5/8" 29.7 ppf TXP casing 8,300.0 9,100.0 00:00 02:15 from 8,300' MD to 9,100' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. Initial Breakover Wt = 265 klbs, P/U Wt = 255 klbs, and S/O Wt = 138 klbs. 10/25/2019 10/25/2019 2.25 INTRM1 CASING CIRC P Circulated at 9,100' MD. Slowly 9,100.0 9,100.0 02:15 04:30 staging up to 6 bpm w/ ICP = 440 psi and FCP = 330 psi (11.3 ppg return mud). Total strokes = 6,200 psi. P/U Wt = 252 klbs, and S/O Wt = 142 klbs. 10/25/2019 10/25/2019 1.50 INTRM1 CASING PUTB P RIH w/ 7 5/8" 29.7 ppf TXP casing 9,100.0 10,100.0 04:30 06:00 from 9,100' MD to 10,100' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. S/O Wt = 138 klbs. 10/25/2019 10/25/2019 4.75 INTRM1 CASING PUTB P RIH w/ 7 5/8" 29.7 ppf TXP casing 10,100.0 12,351.0 06:00 10:45 from 10,100' MD to 12,351' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 310 klbs, and S/O Wt = 148 klbs. 10/25/2019 10/25/2019 0.75 INTRM1 CASING PUTB P RIH w/ 7 5/8" 29.7 ppf TXP casing 12,351.0 12,621.0 10:45 11:30 from 12,351' MD to 12,621' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 310 klbs, and S/O Wt = 148 klbs. 10/25/2019 10/25/2019 3.00 INTRM1 CASING CIRC P CBU at 12,621' MD. Reciprocated 12,621.0 12,621.0 11:30 14:30 pipe between 12,621' MD and 12,581' MD. Staged up to 6 bpm w/ ICP = 349 psi and FCP = 307 psi (11.0 ppg return mud). P/U Wt = 300 klbs, and S/O Wt = 168 klbs. 10/25/2019 10/25/2019 1.00 INTRMI CASING PUTB P RIH w/ 7 5/8" 29.7 ppf Eagle casing 12,621.0 12,931.0 14:30 15:30 from 12,621' MD to 12,931' MD. MUT = 20.0 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 316 klbs, and S/O Wt = 160 klbs. 10/25/2019 10/25/2019 2.50 INTRM1 CASING PUTB P RIH w/ 7 5/8" X-O to TXP casing 12,931.0 14,135.0 15:30 18:00 from 12,931' MD to 14,135' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. P/U Wt = 425 klbs, and S/O Wt = 152 klbs. Page 17/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/25/2019 10/25/2019 3.00 INTRM1 CASING PUTB P RIH w/ 7 5/8" 29.7 ppf TXP casing 14,135.0 15,161.0 18:00 21:00 from 14,135' MD to 15,161' MD. MUT = 21.3 kftlbs. Filled pipe on the fly using the Volant tool whilst topping off every 10th joint. Manually strapped trip pit every 10 joints. S/0 Wt = 117 klbs. 10/25/2019 10/25/2019 1.50 INTRM1 CASING CIRC P Staged up pumps to 6 bpm. SPP = 15,161.0 15,161.0 21:00 22:30 430 psi, F/0 = 22%, and Total strokes = 3,300 10/25/2019 10/25/2019 0.50 INTRM1 CASING HOSO P M/U hanger and landing joint. Landed 15,161.0 15,281.0 22:30 23:00 hanger at 15,281' MD. 10/25/2019 10/26/2019 1.00 INTRM1 CEMENT CIRC P Reciprocated pipe f/ 15,280' MD to 15,281.0 15,281.0 23:00 00:00 15,260' MD. Circulated to thin mud down to 10.6 ppg, 6 bpm, F/0 = 22%, SPP = 430 psi, Attained P/U Wt = 370 klbs once hole cleaned up. S/0 Wt = 126 klbs. Total strokes = 7,800 psi. 10/26/2019 10/26/2019 4.50 INTRM1 CEMENT CIRC P Reciprocated pipe from 15,281' MD to 15,281.0 15,281.0 00:00 04:30 15,260' MD while circulating and thing down the MW to 10.6 ppg. Staged pumps up to 8 bpm. F/0 = 23%, SPP = 595 psi, P/U Wt = 370 klbs, S/0 Wt = 126 klbs, Total strokes = 25,600. 10/26/2019 10/26/2019 4.00 INTRMI CEMENT CMNT P PJSM. Blowed down top drive. R/U 15,281.0 15,281.0 04:30 08:30 cement and bleeder hose. Pressure tested lines to 4,000 psi. Pumped 64 bbls of 13 ppg mud push at 4 bpm ( Pressure = 100-280 psi, F/0 = 17%). Batch mixed cement. Dropped bottom plug. Pumped 214 bbls of 15.8 ppg tail cement ( Pressure = 320 psi, F/0 = 16%). Dropped top plug. Pumped 20 bbls water. Displaced 663 bbls (6,580 strokes, FCP = 360 psi, F/0 = 8%) w/ rig pumps to bump the plug and pressure up to 900 psi (for 5 minutes). B/O and checked floats. Cement was in place at 0810hr. 10/26/2019 10/26/2019 2.00 INTRM1 CEMENT WWSP P Set and tested 7 5/8" pack off to 5,000 15,281.0 15,281.0 08:30 10:30 psi. 10/26/2019 10/26/2019 1.50 INTRM1 CEMENT CLEN P Cleaned and cleared rig floor of non- 15,281.0 15,281.0 10:30 12:00 essential tools. 10/26/2019 10/26/2019 2.75 INTRM1 CEMENT BOPE P R/U to drill 6 1/2" production hole. C/O 0.0 0.0 12:00 14:45 saver sub, and pipe rams to 2 7/8" x 5 1/2" VBR's. 10/26/2019 10/26/2019 2.00 INTRM1 DRILLOUT BHAH P PJSM. P/U BHA#3 from surface to 0.0 350.0 14:45 16:45 350' MD. P/U Wt = 47 klbs, and S/0 Wt = 55 klbs. Monitored returns on pit #7. 10/26/2019 10/26/2019 2.75 INTRM1 DRILLOUT PULD P RIH while picking up 4" XT39 drill pipe 350.0 2,230.0 16:45 19:30 from 350' MD to 2,230' MD. P/U Wt = 80 klbs, and S/0 Wt = 81 klbs. Monitored returns on pit #7. 10/26/2019 10/26/2019 1.00 INTRM1 DRILLOUT DHEQ P Filled pipe. Performed MWD shallow 2,230.0 2,230.0 19:30 20:30 hole test. GPM = 230 gpm and F/0 = 15%. 10/26/2019 10/26/2019 3.00 INTRM1 DRILLOUT PULD P Continued to RIH while picking up 4" 2,230.0 4,880.0 20:30 23:30 XT39 drill pipe from 2,230' MD to 4,880' MD. P/U Wt = 90 klbs, and S/0 Wt = 91 klbs. Monitored returns on pit #7. Filled pipe every 20 stands. 10/26/2019 10/27/2019 0.50 INTRM1 DRILLOUT SVRG P Serviced top drive, blocks, and crown. 4,880.0 4,880.0 23:30 00:00 1 I Page 18151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 . . . Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 10/27/2019 10/27/2019 5.00 INTRM1 DRILLOUT PULD P Continued to RIH while picking up 4" 4,880.0 7,114.0 00:00 05:00 XT39 drill pipe from 4,880' MD to 7,114' MD. P/U Wt = 96 klbs, and S/O Wt = 95 klbs. Monitored returns on pit #2. Filled pipe every 20 stands. 10/27/2019 10/27/2019 1.00 INTRM1 DRILLOUT SVRG P Inspected and maintained Top Drive. 7,114.0 7,114.0 05:00 06:00 10/27/2019 10/27/2019 3.00 INTRM1 DRILLOUT RGRP T Changed out upper I-BOP. 7,114.0 7,114.0 06:00 09:00 10/27/2019 10/27/2019 2.00 INTRM1 WHDBOP MPSP P PJSM. P/U storm packer. P/U Wt = 7,114.0 7,174.0 09:00 11:00 111 klbs, and S/O Wt = 98 klbs. RIH 60' and set packer in place. 10/27/2019 10/27/2019 1.00 INTRM1 WHDBOP RURD P PJSM. Rig up to test BOPE w/ 4" test 7,174.0 7,174.0 11:00 12:00 joint. 10/27/2019 10/27/2019 3.00 INTRM1 WHDBOP BOPE P Tested BOPE. All tests 250psi 7,174.0 7,174.0 12:00 15:00 low/3500psi high for 5 charted minutes with exception of manual operated and super chokes tested to 250/2000psi for 5 charted minutes. Using 4" test jt, test annular, 2 7/8" x 5 1/2" UPR, 2 7/8" x 5 1/2" LPR. Test choke valves 1-15, manual operated and super choke, choke and kill manuals and HCR's, 4" valve on kill line, 4" FOSV, 4" dart valve, upper and lower IBOP, and Blind/Shear Rams. Perform Koomey drawdown, ACC=2900psi, Manifold=1500psi, ACCU=1650psi after all functions on just bottles. 14 secs to 200psi build with 2 electric pumps, 97 secs to build to full system pressure with 2 electric and 2 air pumps. Closing times, annular=23 secs, UPR= 18 secs, blind/shears= 16 secs, LPR= 16 sec, Choke HCR= 2 sec, kill HCR = 2 sec. Tested PVT gain/loss and flow alarms. Tested LEL and H2S alarms. Witnessed byAOGCC Rep: Jeff Jones. 10/27/2019 10/27/2019 2.00 INTRM1 WHDBOP RURD P Rigged down BOPE testing equipment 7,174.0 7,174.0 15:00 17:00 and set 6 7/8" wear ring. 10/27/2019 10/27/2019 1.50 INTRM1 WHDBOP MPSP P PJSM. RIH to 60' with overshot 7,174.0 7,114.0 17:00 18:30 retrieval tool. Engaged overshot and pulled storm packer. L/D storm packer. 10/27/2019 10/27/2019 0.75 INTRM1 DRILLOUT SEQP P Blowed down choke manifold and 7,114.0 7,114.0 18:30 19:15 choke line. Removed PS-21's. Installed master bushing. 10/27/2019 10/27/2019 0.75 INTRM1 DRILLOUT FRZP P Freeze protect OA w/ 71 bbls diesel. 7,114.0 7,114.0 19:15 20:00 Final Shut in pressure = 625 psi. SIMOPS: Adjust upper I-BOP actuator. 10/27/2019 10/28/2019 4.00 INTRM1 DRILLOUT PULD P Continued to RIH while picking up 4" 7,114.0 9,884.0 20:00 00:00 XT39 drill pipe from 7,114' MD to 9,884' MD. P/U Wt = 125 klbs, and S/O Wt = 114 klbs. Monitored returns on pit #2. Filled pipe every 20 stands. 10/28/2019 10/28/2019 1.00 INTRMI DRILLOUT PULD P Continued to RIH while picking up 4" 9,884.0 10,300.0 00:00 01:00 XT39 drill pipe from 9,884' MD to 10,300' MD. P/U Wt = 126 klbs, and S/O Wt = 115 klbs. Monitored returns on pit #2. Page 19151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/28/2019 10/28/2019 7.00 INTRM1 DRILLOUT QEVL P Filled pipe and downlinked to LWD to 10,300.0 14,175.0 01:00 08:00 turn on SonicScope for logging cement. Continued to RIH while picking up 4" XT39 drill pipe from 10,300' MD to 14,175' MD at 1750 fph. P/U Wt = 178 klbs, and S/O Wt = 123 klbs. Monitored returns on pit #2. 10/28/2019 10/28/2019 0.75 INTRM1 DRILLOUT QEVL P Log R/Atag w/ GPM = 230 gpm, SPP 14,175.0 14,175.0 08:00 08:45 = 2,145 psi, Rotary = 60 rpm. Located tag at 14,178' MD. Relocated it with no rotation. GPM = 230 gpm, SPP = 2,144 psi, Relocated tag at 14,178' MD. 10/28/2019 10/28/2019 1.75 INTRM1 DRILLOUT QEVL P Continued to RIH while picking up 4" 14,175.0 15,022.0 08:45 10:30 XT39 drill pipe from 14,175' MD to 15,022' MD at 1750 fph (Logging cement). P/U Wt = 178 klbs, and S/O Wt = 124 klbs. Monitored returns on pit #2. 10/28/2019 10/28/2019 1.00 INTRM1 DRILLOUT CIRC P Circulated and conditioned mud at 240 15,022.0 15,022.0 10:30 11:30 gpm, SSP = 2,220 psi, Rotary = 50 rpm, and TQ = 7-8 kftlbs. Reciprocated pipe 90'. 10/28/2019 10/28/2019 0.50 INTRM1 DRILLOUT RURD P PJSM. Rigged up to test 7 5/8" casing. 15,022.0 15,022.0 11:30 12:00 10/28/2019 10/28/2019 0.75 INTRM1 DRILLOUT PRTS P PJSM. Tested 7 5/8" casing to 3,500 15,022.0 15,022.0 12:00 12:45 psi for 30 minutes (Charted).Closed UPR and pumped down DP and kill line at 1 bpm. Pumped 80 strokes (8.05 bbls) to full pressure. Bled back 7.8 bbls. 10/28/2019 10/28/2019 0.50 INTRM1 DRILLOUT BHAH P Cleaned and cleared rig floor of non- 15,022.0 15,022.0 12:45 13:15 essential tools. 10/28/2019 10/28/2019 2.00 INTRMI DRILLOUT SLPC P Slipped and cut drill line (57 wraps). 15,022.0 15,022.0 13:15 15:15 448'. 10/28/2019 10/28/2019 1.75 INTRM1 DRILLOUT COCF P Washed and reamed down to float 15,022.0 15,187.0 15:15 17:00 collar. From 15,022' MD to 15,187' MD. GPM = 150 gpm, SPP = 978 psi, Rotary = 50 rpm, TQ = 11.5 kftlbs, F/O = 14%, P/U Wt = 182 klbs, and S/O Wt = 126 klbs. 10/28/2019 10/28/2019 3.50 INTRM1 DRILLOUT DRLG P Drilled shoe track and rat hole from 15,187.0 15,294.0 17:00 20:30 15,187' MD to 15,294' MD. GPM = 150 gpm, SPP = 978 psi, Rotary = 50 rpm, TQ = 11.5 kftlbs, F/O = 14%, P/U Wt = 182 klbs, and S/O Wt = 126 klbs. 10/28/2019 10/28/2019 1.50 INTRM1 DRILLOUT DDRL P Drilled 6 1/2" Production from 15,294' 15,294.0 15,314.0 20:30 22:00 MD to 15,314' MD (7,718' TVD). WOB = 10 klbs, GPM = 200 gpm, SPP = 1,780 psi, Rotary = 60 rpm, TQ On = 13 kftlbs, TQ Off = 8 klbs, F/O = 19 %, ECD = 11.03 ppg, P/U Wt = 173 klbs, S/O Wt = 123 klbs, and Rot Wt = 139 klbs. ADT = 0.66 hrs, Total Bit Hours = 0.66 hrs, and Total Jar Hours = 84.62 hrs. 10/28/2019 10/29/2019 2.00 INTRM1 DRILLOUT CIRC P L/D double. Circulated and 15,314.0 15,269.0 22:00 00:00 conditioned mud to 10.05 ppg in and out. Rotated and reciprocated whilst conditiong mud from 15,269' MD to 15,194' MD. GPM = 215 gpm, SPP = 1975 psi, Rotary = 50 rpm, TQ = 8 kftlbs, F/O = 19%, and total strokes = 5891. Page 20/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/29/2019 10/29/2019 0.75 INTRM1 DRILLOUT OWFF P SPR's. OWFF (Static). B/D top drive 15,269.0 15,269.0 00:00 00:45 and R/U for F.I.T. 10/29/2019 10/29/2019 0.75 INTRM1 DRILLOUT FIT P Performed FIT to 1,000 psi w/ 10.05 15,269.0 15,314.0 00.45 01:30 ppg LSND. EMW for FIT was 12.5 ppg. R/D tested equipment. Blowed down lines. 10/29/2019 10/29/2019 0.50 INTRM1 DRILLOUT MPDA P Pulled trip nipple and installed MPD. 15,314.0 15,314.0 01:30 02:00 10/29/2019 10/29/2019 4.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 15,314' 15,314.0 15,405.0 02:00 06:00 MD to 15,405' MD (7,729' TVD). WOB = 7 klbs, GPM = 240 gpm, SPP = 1,840 psi, Rotary = 100 rpm, TQ On = 9 kftlbs, F/O = 15 %, ECD = 9.93 ppg, P/U Wt = 193 klbs, S/O Wt = 120 klbs, and Rot Wt = 143 klbs. ADT = 2.77 hrs, Total Bit Hours = 3.43 hrs, and Total Jar Hours = 87.39 hrs. MPD connection back pressure = 0 psi. Displaced to 9.0 ppg FloPro while drilling. SIMOPS: L/D 5" DP from derrick, and attempted to initialize Novos but was unable to initialize. 10/29/2019 10/29/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 15,405' 15,405.0 16,070.0 06:00 12:00 MD to 16,070' MD (7,756' TVD). WOB = 14 klbs, GPM = 240 gpm, SPP on = 1,970 psi, SPP off= 1,935 psi, Rotary = 140 rpm, TQ On = 10 kftlbs, TQ Off = 7 kftlbs, F/O = 15 %, ECD = 10.19 ppg, P/U Wt = 183 klbs, S/O Wt = 112 klbs, and Rot Wt = 142 klbs. ADT = 4.34 hrs, Total Bit Hours = 7.77 hrs, and Total Jar Hours = 91.73 hrs. MPD connection back pressure = 0 psi. SIMOPS: L/D 5" DP from derrick and used Novos as autodriller. 10/29/2019 10/29/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 16,070' 16,070.0 16,830.0 12:00 18:00 MD to 16,830' MD (7,762' TVD). WOB = 12.5 klbs, GPM = 250 gpm, SPP on = 2,093 psi, SPP off = 2,025 psi, Rotary = 160 rpm, TQ On = 11-12 kftlbs, TQ Off = 7 kftlbs, F/O = 15 ECD = 10.43 ppg, P/U Wt = 178 klbs, S/O Wt = 109 klbs, and Rot Wt = 148 klbs. ADT = 4.01 hrs, Total Bit Hours = 11.78 hrs, and Total Jar Hours = 95.74 hrs. MPD connection back pressure = 0 psi. Drilled with Novos slips to slips. No soft speed as per SLB rep. Page 21/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/29/2019 10/30/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 16,830' 16,830.0 17,590.0 18:00 00:00 MD to 17,590' MD (7,772' TVD). WOB = 15 klbs, GPM = 260 gpm, SPP on = 2,648 psi, SPP off = 2,568 psi, Rotary = 150 rpm, TQ On = 15 kftlbs, TQ Off = 8 kftlbs, F/O = 16 %, ECD = 10.75 ppg, P/U Wt = 178 klbs, S/O Wt = 144 klbs, and Rot Wt = 144 klbs. ADT = 3.49 hrs, Total Bit Hours = 15.27 hrs, and Total Jar Hours = 99.23 hrs. MPD connection back pressure = 0 psi. Drilled w/ Novos slips to slips. Two stands Novos stopped drilling w/ 6' left on stand and would not initialize again. Novos was rebooted a second time. No soft speed as per SLB rep. Power Drive short hop transmission stopped communicating w/ LWD at 17,010' MD. Decision was made to resume drilling and monitor directional responses moving forward. Power Drive GR and Directional data are not being transmitted, but the tool still seems to be responding to directional commands. LWD data is still transmitting in real time. 10/30/2019 10/30/2019 2.50 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 17,590' 17,590.0 17,870.0 00:00 02:30 MD to 17,870' MD (7,777' TVD). WOB = 13 klbs, GPM = 260 gpm, SPP on = 2,700 psi, Rotary = 150 rpm, TQ On = 14 kftlbs, TQ Off = 5 kftlbs, F/O = 17 %, ECD = 10.76 ppg, P/U Wt = 178 klbs, S/O Wt = 112 kibs, and Rot Wt = 144 klbs. MPD connection back pressure = 0 psi. 10/30/2019 10/30/2019 1.00 PROD1 DRILL OTHR T Troubleshooted Power Drive w/ anti- 17,870.0 17,870.0 02:30 03:30 jamming sweep. Attempted to send 60 second downlink w/ Novos (Incorrect timing sequence format). Reverted to Amphion to send the downlink. 10/30/2019 10/30/2019 2.50 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 17,870' 17,870.0 18,255.0 03:30 06:00 MD to 18,255' MD (7,777' TVD). WOB = 14 klbs, GPM = 240 gpm, SPP on = 2,495 psi, SPP off = 2,415 psi, Rotary = 150 rpm, TQ On = 14 kftlbs, TQ Off = 5 kftlbs, F/O = 17 %, ECD = 10.8 ppg, P/U Wt = 181 klbs, S/O Wt = 113 klbs, and Rot Wt = 145 klbs. ADT = 3.13 hrs (0:00 - 06:00hr), Total Bit Hours = 18.40 hrs, and Total Jar Hours = 102.36 hrs. MPD connection back pressure = 0 psi. 10/30/2019 10/30/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 18,255' 18,255.0 19,199.0 06:00 12:00 MD to 19,199' MD (7,785' TVD). WOB = 19 klbs, GPM = 250 gpm, SPP on = 2,758 psi, SPP off = 2,485 psi, Rotary 150 rpm, TQ On = 16 kftlbs, TQ Off = 8 kftlbs, F/O = 16 %, ECD = 11.1 ppg, P/U Wt = 177 klbs, S/O Wt = 108 klbs, and Rot Wt = 143 klbs. ADT = 3.52 hrs, Total Bit Hours = 21.92 hrs, and Total Jar Hours = 105.88 hrs. MPD connection back pressure = 0 psi. Drilling w/ Novos slips to slips. SIMOPS: L/D 5" DP w/ 90' mouse hole. Page 22/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/30/2019 10/30/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 19,199' 19,199.0 20,051.0 12:00 18:00 MD to 20,051' MD (7,794' TVD). WOB = 17 kibs, GPM = 255 gpm, SPP on = 2,970 psi, SPP off = 2,844 psi, Rotary = 150 rpm, TQ On = 16 kftlbs, TQ Off = 6 kftlbs, F/O = 16 %, ECD = 11.26 ppg, P/U Wt = 180 kibs, S/O Wt = 103 kibs, and Rot Wt = 143 klbs. ADT = 3.29 hrs, Total Bit Hours = 25.21 hrs, and Total Jar Hours = 109.17 hrs. MPD connection back pressure = 0 psi. Drilling w/ Novos slips to slips. 10/30/2019 10/30/2019 1.00 PROD1 DRILL OTHR T Installed Novos and Stick Slip 20,051.0 20,051.0 18:00 19:00 Channel on Totco. Troubleshooted installation and rebooted Totco. 10/30/2019 10/31/2019 5.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 20,051' 20,051.0 20,812.0 19:00 00:00 MD to 20,812' MD (7,802' TVD). WOB = 18 klbs, GPM = 255 gpm, SPP on = 3,026 psi, SPP off = 2,850 psi, Rotary = 150 rpm, TQ On = 15 kftlbs, TQ Off = 8 kftlbs, F/O = 16 %, ECD = 11.19 ppg, P/U Wt = 179 klbs, S/O Wt = 101 kibs, and Rot Wt = 143 kibs. ADT = 3.26 hrs, Total Bit Hours = 28.47 hrs, and Total Jar Hours = 112.43 hrs. MPD connection back pressure = 0 psi. 10/31/2019 10/31/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 20,812' 20,812.0 21,580.0 00:00 06:00 MD to 21,580' MD (7,814' TVD). WOB = 18 kibs, GPM = 260 gpm, SPP on = 3,320 psi, SPP off = 3,215 psi, Rotary = 150 rpm, TQ On = 14 kftlbs, TQ Off = 9 kftlbs, F/O = 16 %, ECD = 11.39 ppg, P/U Wt = 178 kibs, S/O Wt = 98 kibs, and Rot Wt = 139 kibs. ADT = 4.05 hrs, Total Bit Hours = 32.52 hrs, and Total Jar Hours = 116.48 hrs. MPD connection back pressure = 8 psi. Novos not in use due to update 03:00 - 12:00hr. 10/31/2019 10/31/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 20,580' 21,580.0 22,352.0 06:00 12:00 MD to 22,352' MD (7,827' TVD). WOB = 15 kibs, GPM = 261 gpm, SPP on = 3,333 psi, SPP off = 3,261 psi, Rotary = 160 rpm, TQ On = 16 kftlbs, TQ Off = 9 kftlbs, F/O = 19 %, ECD = 11.67 ppg, P/U Wt = 178 klbs, S/O Wt = 92 kibs, and Rot Wt = 139 kibs. ADT = 4.20 hrs, Total Bit Hours = 36.72 hrs, and Total Jar Hours = 120.68 hrs. MPD connection back pressure = 12 psi. Novos not in use. Waiting on update confirmation. 10/31/2019 10/31/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 22,352' 22,352.0 23,187.0 12:00 18:00 MD to 23,187' MD (7,832' TVD). WOB = 18 kibs, GPM = 261 gpm, SPP on = 3,450 psi, SPP off = 3,393 psi, Rotary = 160 rpm, TQ On = 15 kftlbs, TQ Off = 9 kftlbs, F/O = 19 %, ECD = 11.73 ppg, P/U Wt = 184 kibs, S/O Wt = 86 klbs, and Rot Wt = 134 kibs. ADT = 4.13 hrs, Total Bit Hours = 40.85 hrs, and Total Jar Hours = 124.81 hrs. MPD connection back pressure = 14 psi. Troubleshooting new update on Novos. Drilling w/Amphion. Page 23/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 10/31/2019 10/31/2019 2.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 23,187' 23,187.0 23,375.0 18:00 20:00 MD to 23,375' MD (7,835' TVD). WOB = 12 klbs, GPM = 255 gpm, SPP on = 3,182 psi, SPP off = 3,100 psi, Rotary = 130 rpm, TQ On = 14 kftlbs, TQ Off = 10 kftlbs, F/O = 19 %, ECD = 12.01 ppg, P/U Wt = 181 klbs, S/O Wt = 84 klbs, and Rot Wt = 135 klbs. MPD connection back pressure = 10 psi. Continued to troubleshoot new Novos update. Drilled w/Amphion. 10/31/2019 10/31/2019 1.50 PROD1 DRILL CIRC T Circulated while rotating and 23,375.0 23,375.0 20:00 21:30 reciprocating from 23,375' MD to 23,288' MD w/ GPM = 256 gpm, SPP = 3,056 psi, F/O = 19%, Rotary = 130 rpm, TQ = 10 kftlbs, ECD = 12.1 - 10.9 ppg. Total pumped strokes = 3,687 due to high ECD's 10/31/2019 11/1/2019 2.50 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 23,375' 23,375.0 23,722.0 21:30 00:00 MD to 23,772' MD (7,835' TVD). WOB = 13 klbs, GPM = 260 gpm, SPP on = 3,430 psi, SPP off = 3,284 psi, Rotary = 150 rpm, TQ On = 14 kftlbs, TQ Off = 10 kftlbs, F/O = 19 %, ECD = 11.99 ppg, P/U Wt = 176 klbs, S/O Wt = 80 klbs, and Rot Wt = 134 klbs. ADT = 3.45 hrs, Total Bit Hours = 44.3 hrs, and Total Jar Hours = 128.26 hrs. MPD connection back pressure = 10 psi. Continued to troubleshoot new Novos update. Drilled w/ Amphion. 11/1/2019 11/1/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 23,772' 23,722.0 24,323.0 00:00 06:00 MD to 24,323' MD (7,842' TVD). WOB = 9 klbs, GPM = 257 gpm, SPP on = 3,345 psi, SPP off = 3,240 psi, Rotary = 150 rpm, TQ On = 15 kftlbs, TQ Off = 10 kftlbs, F/O = 19 %, ECD = 11.3 ppg, P/U Wt = 179 klbs, S/O Wt = 85 klbs, and Rot Wt = 140 klbs. ADT = 4.57 hrs, Total Bit Hours = 48.87 hrs, and Total Jar Hours = 132.83 hrs. MPD connection back pressure = 15 psi. Continued to drill w/Amphion. Waiting on Novos update. 11/1/2019 11/1/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 24,323' 24,323.0 24,988.0 06:00 12:00 MD to 24,988' MD (7,849' TVD). WOB = 11 klbs, GPM = 257 gpm, SPP on = 3,360 psi, SPP off = 3,200 psi, Rotary = 150 rpm, TQ On = 16 kftlbs, TQ Off = 10 kftlbs, F/O = 19 %, ECD = 11.68 ppg, P/U Wt = 179 klbs, S/O Wt = 64 klbs, and Rot Wt = 137 klbs. ADT = 4.42 hrs, Total Bit Hours = 53.29 hrs, and Total Jar Hours = 137.25 hrs. MPD connection back pressure = 12 psi. Continued to drill w/ Amphion. Waiting on Novos update. Page 24/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/1/2019 11/1/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 24,988' 24,988.0 25,736.0 12:00 18:00 MD to 25,736' MD (7,849' TVD). WOB = 11 klbs, GPM = 250 gpm, SPP on = 3,230 psi, SPP off = 3,110 psi, Rotary = 130 rpm, TQ On = 15 kftlbs, TQ Off = 10 kftlbs, F/O = 20 %, ECD = 11.28 ppg, P/U Wt = 186 klbs, S/O Wt = 53 klbs, and Rot Wt = 138 klbs. ADT = 3.67 hrs, Total Bit Hours = 56.96 hrs, and Total Jar Hours = 140.92 hrs. MPD connection back pressure = 12 psi. Drilled w/ Novos. 11/1/2019 11/2/2019 6.00 PROD1 DRILL DDRL P Drilled 6 1/2" Production from 25,736' 25,736.0 26,480.0 18:00 00:00 MD to 26,480' MD (7,861' TVD). WOB = 15 klbs, GPM = 250 gpm, SPP on = 3,320 psi, SPP off = 3,204 psi, Rotary = 140 rpm, TQ On = 17 kftlbs, TQ Off = 9.5 kftlbs, F/O = 18 %, ECD = 11.49 ppg, P/U Wt = 183 klbs, S/O Wt = 72 klbs, and Rot Wt = 160 klbs. ADT = 3.94 hrs, Total Bit Hours = 60.90 hrs, and Total Jar Hours = 144.86 hrs. MPD connection back pressure = 12 psi. Drilled w/ Novos. 11/2/2019 11/2/2019 1.50 PROD1 DRILL DDRL T Drilled w/ Novos WOB limit = 18 klbs 26,480.0 26,480.0 00:00 01:30 and actual drilling was on 8 klbs. WOB exceed the Novos limit at 21 klbs thus resulting in loss of ROP and a sharp increase in torque from 17 kftlbs to 22 kftlbs. Attempted to reset and continue drilling a total of 4 times. Observed some buckling. No ROP or footage was made. 11/2/2019 11/2/2019 4.00 PROD1 DRILL CIRC T Circulated and reciprocated from 26, 26,480.0 26,473.0 01:30 05:30 473' MD to 26,410' MD w/ GPM = 250 gpm, SPP = 3,200 psi, F/O = 17%, Rotary = 50-100 rpm, TQ = 10 kftlbs, ECD = 11.1 ppg, P/U Wt = 185 klbs, S/O Wt = 77 klbs, Rot Wt = 143 klbs, Total Pumped Strokes = 14,900. Racked back one stand 4" DP in Derrick after each bottoms up. 11/2/2019 11/2/2019 1.25 PROD1 DRILL CIRC T P/U stand from Derrick and RIH from 26,473.0 26,476.0 05:30 06:45 to 26,476' MD. Rotary = 100 rpm, GPM = 250 gpm, SPP = 3,150 psi, F/O = 18%, TQ = 10-12 kftlbs, Set WOB 25 klbs (no ROP). Downlinked and set RSS to neutral. Racked back stand. 11/2/2019 11/2/2019 0.25 PROD1 DRILL OWFF T Fingerprinted well. Well was not 26,476.0 26,413.0 06:45 07:00 underbalance. Mud weight 9.0+ shut on well with 108psi, open 15sec, shut in for 5min build up to 18psi. Open choke 15sec. shut in for 5 min. Opsi build up. Plan kill fluid 9.4ppg brine for trip margin. 11/2/2019 11/2/2019 5.00 PROD1 DRILL BKRM T BROOH from 26,413' MD to 24,575' 26,413.0 24,575.0 07:00 12:00 MD w/ GPM = 250 gpm, SPP = 2,963 psi, Rotary = 80-120 rpm, TQ = 8-10 kftlbs, F/O = 15%, ECD = 10.55 ppg, P/U Wt = 180 klbs, S/O Wt = 90 klbs, and Rot Wt = 141 klbs. Page 25/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/2/2019 11/2/2019 6.00 PROD1 DRILL SMPD T Blowed down top drive and SOOH 24,575.0 19,200.0 12:00 18:00 from 24,575' MD to 19,200' MD w/ 4" DP racked back in derrick. P/U Wt = 185 klbs. Monitored displacement on pit #3. 11/2/2019 11/2/2019 3.50 PROD1 DRILL SMPD T Continued to SOOH per schedule 19,200.0 15,180.0 18:00 21:30 from 19,200' MD to 15,180' MD w/ 4" DP, racking back in the derrick. P/U Wt = 185 klbs. Monitored displacement on pit #3. 11/2/2019 11/3/2019 2.50 PROD1 DRILL DISP T PJSM. Displaced well to 9.4 ppg KW 15,180.0 15,095.0 21:30 00:00 brine. Reciprocated from 15,194' MD to 15,097' MD w/ GPM =250 gpm, SPP = 865 psi, F/O = 14%, P/U Wt = 206 klbs, S/O Wt = 107 klbs, Total Strokes = XXXX. 11/3/2019 11/3/2019 0.50 PROD1 DRILL OWFF T OWFF (Static) 15,095.0 15,095.0 00:00 00:30 11/3/2019 11/3/2019 1.00 PROD1 DRILL SLPC T PJSM. Slipped and cut 120' of drill line 15,095.0 15,095.0 00:30 01:30 (15 wraps). 11/3/2019 11/3/2019 0.50 PROD1 DRILL SVRG T Lubricated top drive/blocks, and 15,095.0 15,095.0 01:30 02:00 calibrated blocks. 11/3/2019 11/3/2019 0.50 PROD1 DRILL SMPD T SOOH from 15,180' MD to 14,610' MD 15,095.0 14,610.0 02:00 02:30 w/ 4" DP racking back in the derrick. PU/Wt = 170 klbs and Monitored displacement on pit #3. 11/3/2019 11/3/2019 1.50 PROD1 DRILL DLOG T Reciprocated up and pumped in hole 14,610.0 14,230.0 02:30 04:00 whiile logging from 14,440' MD to 14,490' MD, and 14,185' MD (R/A pip tag). 11/3/2019 11/3/2019 2.00 PROD1 DRILL SMPD T SOOH from 14,230' MD to 11,180' MD 14,230.0 11,180.0 04:00 06:00 w/ 4" DP racking back in the derrick. PU/Wt = 168 klbs and Monitored displacement on pit #3. 11/3/2019 11/3/2019 6.00 PROD1 DRILL SMPD T SOOH from 11,180' MD to 2,300' MD 11,180.0 2,300.0 06:00 12:00 w/ 4" DP racking back in the derrick. PU/Wt = 82 klbs and Monitored displacement on pit #3. 11/3/2019 11/3/2019 0.75 PROD1 DRILL SMPD T SOOH from 2,300' MD to 980' MD w/ 2,300.0 980.0 12:00 12:45 4" DP racking back in the derrick. PU/Wt = 64 kibs and Monitored displacement on pit #3. 11/3/2019 11/3/2019 0.50 PROD1 DRILL BHAH T Found washout in the bottom ofjoint 7 980.0 980.0 12:45 13:15 and on the top ofjoint 6. L/D and replaced both joints. P/U Wt = 64 klbs and S/O Wt = 55 klbs. 11/3/2019 11/3/2019 0.75 PROD1 DRILL SMPD T SOOH from 980' MD to 350' MD w/ 4" 980.0 350.0 13:15 14:00 DP racking back in the derrick. PU/Wt = 64 klbs and Monitored displacement on pit #3. 11/3/2019 11/3/2019 0.50 PROD1 DRILL OWFF T OWFF (Static). 350.0 350.0 14:00 14:30 11/3/2019 11/3/2019 1.00 PROD1 DRILL MPDA T Removed MPD bearing and installed 350.0 350.0 14:30 15:30 trip nipple. 11/3/2019 11/3/2019 2.50 PROD1 DRILL BHAH T L/D #3 BHA from 350' MD to surface. 350.0 0.0 15:30 18:00 PU/Wt = 54 klbs and S/O Wt = 53 klbs. Monitored displacement on pit #3. 11/3/2019 11/3/2019 1.00 PROD1 DRILL BHAH T Cleaned and cleared rig floor of all 0.0 0.0 18:00 19:00 non-essential tools and equipment. 11/3/2019 11/3/2019 1.00 PROD1 WHDBOP RURD T Drained stack, pulled wear ring, and 0.0 0.0 19:00 20:00 installed test plug as per FMC. Page 26151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth StartTime End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operaflon (WB) End Depth (WB) 11/3/2019 11/3/2019 1.50 PROD1 WHDBOP RURD T Rigged up to test BOPS. 0.0 0.0 20:00 21:30 11/3/2019 11/4/2019 2.50 PROD1 WHDBOP BOPE T Tested BOPE. All tests 250psi 0.0 0.0 21:30 00:00 low/3500psi high for 5 charted minutes with 4 1/2" test joint. 2 7/8" x 5 1/2" UPR, 2 7/8" x 5 1/2" LPR. Test choke valves 1-3, and 5-15, manual operated and super choke, choke and kill manuals and HCR's, 4" valve on kill line, 4" FOSV, 4" dart valve, upper and lower IBOP, and Blind/Shear Rams. AOGCC Rep Matthew Herrera waived witness on 11/2/2019 at 0836hr. 11/4/2019 11/4/2019 1.00 PROD1 WHDBOP OTHR T [DST] Adjustment 0.0 00:00 01:00 11/4/2019 11/4/2019 2.50 PROD1 WHDBOP BOPE T Tested BOPE. All tests 250psi 0.0 0.0 00:00 02:30 low/3,500psi high for 5 charted minutes with w/ the exception of manual operated and super choke (2,000 psi/2minutes). 4" Test joint. Tested annular, 2 7/8" x 5 1/2" UPR, 2 7/8" x 5 1/2" LPR. Test choke valve 4. manual operated and super choke, choke and kill manuals and HCR's. Performed Koomey drawdown. ACC = 2,950 psi, Manifold = 1,550 psi„ ACC = 1,575 psi after all functions on bottles, 17 seconds for 200 psi. Built pressure w/ 2 electric pumps, 103 seconds to build full system pressure w/ 2 electric and 2 air pumps. Closing time Annulars =23 sec. UPR = 18 sec. Blind/shear rams = 16 sec. LPR = 16 sec. Choke HCR = 2 sec. Kill HCR = 2 sec. Test PVT gain/loss and flow out alarms, Tested LEL and H2S alarms. AOGCC rep Matthew Herrera waived witness on 11/02/2019 at 0836hr. 11/4/2019 11/4/2019 1.00 PROD1 WHDBOP RURD T Pulled test plug and L/D test joint. 0.0 0.0 02:30 03:30 Blowed down choke/kill lines, choke manifold, top drive, and cleaned and cleared rig floor. Installed wear ring. 11/4/2019 11/4/2019 0.50 PROD1 DRILL SVRG T Serviced top drive, blocks, and crown. 0.0 0.0 03:30 04:00 11/4/2019 11/4/2019 2.00 PROD1 DRILL SVRG T PM's rig floor, mud pumps, P/U and 0.0 0.0 04:00 06:00 function tested PS -21 slips, 11/4/2019 11/4/2019 4.25 PROD1 DRILL SVRG T Continued with PM's and worked on 0.0 0.0 06:00 10:15 #1 mud pump. Installed PS -21's. Inspected/serviced iron roughneck and service skate. 11/4/2019 11/4/2019 1.00 PROD1 DRILL BHAH T M/U milling BHA. Monitored 0.0 0.0 10:15 11:15 displacement on bit #3. P/U Wt = 50 klbs, S/O Wt = 50 klbs. Waited on junk mill. 11/4/2019 11/4/2019 0.75 PROD1 DRILL SVRG T Continued with PM's. C/O pressure 0.0 0.0 11:15 12:00 washer pump in BOP deck.. 11/4/2019 11/4/2019 2.50 PROD1 DRILL SVRG T Continued with PM's. C/O batteries on 0.0 0.0 12:00 14:30 MCW. Cleaned and maintained rig. 11/4/2019 11/4/2019 0.50 PROD1 DRILL BHAH T Finished making up milling BHA from 0.0 295.0 14:30 15:00 87' MD to 295' MD. P/U Wt = 54 klbs, and S/O Wt =55 klbs. Page 27/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 ... ') Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/4/2019 11/4/2019 3.00 PROD1 DRILL TRIP T TIH w/ milling BHA from 295' MD to 295.0 4,041.0 15:00 18:00 4,041' MD w/ 4" DP from the derrick. P/U Wt = 83 klbs, and S/O Wt =80 klbs. Monitored displacement on pit #3. Filled pipe every 20 stands. 11/4/2019 11/5/2019 6.00 PROD1 DRILL TRIP T TIH w/ milling BHA from 4,041' MD to 4,041.0 15,220.0 18:00 00:00 15,220' MD w/ 4" DP from the derrick. P/U Wt = 173 klbs, and S/O Wt = 116 klbs. Monitored displacement on pit #3. Filled pipe every 20 stands. 11/5/2019 11/5/2019 0.50 PROD1 DRILL OWFF T OWFF at 15,220' MD (Static) 15,220.0 15,220.0 00:00 00:30 11/5/2019 11/5/2019 2.50 PROD1 DRILL DISP T Circulate and displace 9.4ppg brine to 15,220.0 15,220.0 00:30 03:00 9.Oppg Flo-Pro. (75bbls interfase) work string from 15,220' MD to 15,145' MD 280gpm, Orpm, 1250psi, Flow 14%, P/U Wt = 194 klbs and S/O Wt = 97 klbs. 11/5/2019 11/5/2019 1.00 PROD1 DRILL CIRC T Attempt to TIH from 15,220' MD, 15,220.0 15,290.0 03:00 04:00 tagged with 13k at 15,290' MD. Circulate at 15,244' MD, 200gpm, 980psi, Flow 13%. 11/5/2019 11/5/2019 1.00 PROD1 DRILL REAM T Attempt to TIH from 15,244' MD, 15,290.0 15,397.0 04:00 05:00 Tagged at 15,297' MD 30 klbs, Wash and ream from through ledges at 15,297' MD and 15,397' MD with 20rpm 8klbs torque 80gpm 130psi Rot Wt = 140 klbs. 11/5/2019 11/5/2019 1.00 PROD1 DRILL TRIP T TIH w/ milling BHA on elevators from 15,397.0 16,297.0 05:00 06:00 15,397' MD to 16,297' MD w/ 4" DP from the derrick. S/O Wt = 91 to 101 klbs. Monitored displacement on pit #3. Filled pipe every 20 stands. 11/5/2019 11/5/2019 6.00 PROD1 DRILL TRIP T TIH w/ milling BHA on elevators from 16,297.0 23,857.0 06:00 12:00 16,297' MD to 23,857' MD w/ 4" DP from the derrick. S/O Wt =80 klbs. Monitored displacement on pit #3. Filled pipe every 20 stands. Losses per tour=39bbls 11/5/2019 11/5/2019 2.25 PROD1 DRILL TRIP T Cont. RIH w/ milling BHA from 23,857' 23,857.0 26,455.0 12:00 14:15 MD to 26,455' MD w/ 4" DP from the derrick. S/O Wt = 67-74 klbs. Monitored displacement on pit #3. Filled pipe every 20 stands. 11/5/2019 11/5/2019 0.25 PROD1 DRILL REAM T Wash and ream down with milling BHA 26,455.0 26,477.0 14:15 14:30 from 26,455'MD to 26,477' MDwith 6k down, PU/SO wt 213/73k, RTG wt=140k 11/5/2019 11/5/2019 3.50 PROD1 DRILL MILL T Mill as per Baker rep from 26,477'MD 26,477.0 26,480.0 14:30 18:00 to 26,480.24 (Liklely pipe squat), 4- 6bpm, 1345-1616psi, 13%FO, 60- 80rpm, 10-12k TQ, 10-15k WOB, work pipe as directed. 11/5/2019 11/5/2019 2.50 PROD1 DRILL MILL T Continue to mill as per Baker rep from 26,480.0 26,480.0 18:00 20:30 26,480.24' MD to 26,480.35' MD, gpm=42-175, psi=725-1240, FO=7- 15%, RPM=80, TQ=12-14k, WOB=15- 20k working pipe as directed. Page 28151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/5/2019 11/6/2019 3.50 PROD1 DRILL MILL T Continue to work mill as per Baker rep 26,480.0 26,480.0 20:30 00:00 from 26,480.35' MD-26,450MD, gpm=252, psi=1700-2000 RPM=100- 130, TQ=12-14k, WOB=20k, work pipe as directed. Observe increase in torque at 25k WOB, TO 15-16K, suspected bucklint of pipe at 25k WOB. Continue milling at 20k WOB, tq=12-13k ft -lbs. Resestablish initial parameters, no depth change observed. OA@23:30=170psi Losses for tour=45bbls Cummulative hole section losses=1046bbls 11/6/2019 11/6/2019 1.00 PROD1 DRILL OWFF T Observe Well for Flow. (STATIC) 26,480.0 26,480.0 00:00 01:00 11/6/2019 11/6/2019 5.00 PROD1 DRILL SMPD T SOOH from 26,480' MD to 22,036' MD 26,480.0 22,036.0 01:00 06:00 with 4" Drill Pipe. PU Wt: 211k1bs, SO Wt = 79klbs; holding back pressure via MPD, 85 psi in slips, 415 psi out of slips. 11/6/2019 11/6/2019 6.00 PROD1 DRILL SMPD T SOOH from 22,036' MD to 15,699' MD 22,036.0 15,699.0 06:00 12:00 with 4" Drill Pipe. PU Wt: 210klbs, SO Wt = 87klbs; holding back pressure via MPD, 85 psi in slips, 400 psi out of slips. Tour losses = 47 bbls 11/6/2019 11/6/2019 1.00 PROD1 DRILL SMPD T SOOH from 15,699' MD to 15,194' MD 15,699.0 15,194.0 12:00 13:00 with 4" Drill Pipe. PU Wt: 206k1bs, SO Wt = 107klbs; holding back pressure via MPD, 85 psi in slips, 400 psi out of slips. 11/6/2019 11/6/2019 2.50 PROD1 DRILL DISP T Displace 9.0 ppg FloPro with 9.4 ppg 15,194.0 15,194.0 13:00 15:30 Brine. Circulate @ 215 gpm, 1565 psi, 10% Flow, 11/6/2019 11/6/2019 1.00 PROD1 DRILL SLPC T Slip and cut drill line , 15 wraps (118'), 15,194.0 15,194.0 15:30 16:30 calibrate and service blocks, SIMOPS- 30min OWFF, monitor hole fill on Pit 3 11/6/2019 11/6/2019 1.50 PROD1 DRILL SMPD T Continue SOOH from 15,097'- 15,194.0 13,125.0 16:30 18:00 13,125'MD, MPD holding 82psi in slips, 360psi out of slips, FO=12%, PU/SO Wt=204K/107k, monitor displacement on pits 4 and 5 11/6/2019 11/7/2019 6.00 PROD1 DRILL SMPD T Continue SOOH from 13,125'MD to 13,125.0 3,215.0 18:00 00:00 3,215'MD, MPD 82psi in slips, 140psi out of slips, FO=12%, PU/S0=93K/75K, OA pressure=150psi Tour losses=63bbls Cumulative losses=1 1 56bbls 11/7/2019 11/7/2019 1.50 PROD1 DRILL SMPD T Continue SOOH from 3,215' MD to 3,215.0 1,929.0 00:00 01:30 1,929' MD, L/D 4" drill pipe with bad hard band. MPD 82psi in slips, FO=12%, PU/SO=71 K/77K, Floats not holding. 11/7/2019 11/7/2019 0.50 PROD1 DRILL OWFF T OWFF (Static). 1,929.0 1,929.0 01:30 02:00 11/7/2019 11/7/2019 1.00 PROD1 DRILL MPDA T Removed MPD bearing and installed 1,929.0 1,929.0 02:00 03:00 I trip nipple. Page 29/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/7/2019 11/7/2019 2.50 PROD1 DRILL TRIP T POOH from 1,929' MD to 300' MD, 1,929.0 300.0 03:00 05:30 L/D 4" drill pipe with bad hard band. PU/SO=70K/77K, 11/7/2019 11/7/2019 2.00 PROD1 DRILL BHAH T LD BHA as per Baker rep. Clean and 300.0 0.0 05:30 07:30 inspect boot baskets and magnets and mill/ PU/SO=60K/55K. 10lbs+ metal on magnets, boot baskets clear, chunk missing on boot basket shroud. Hard metal wear on mill face. 11/7/2019 11/7/2019 0.50 PROD1 DRILL BHAH T Clean and clearfloor- Service PS -21 0.0 0.0 07:30 08:00 slips 11/7/2019 11/7/2019 1.50 PROD1 DRILL PULD T Pipe Management - RIH w/ 14 stds of 0.0 1,400.0 08:00 09:30 4" DP fr surface to 1400', PU/SO=54k/55K, SIMOPS-Prep doubles and strap and tally new 4" jts 11/7/2019 11/7/2019 2.50 PROD1 DRILL PULD T POOH L/D total 73 culled singles to 1,400.0 0.0 09:30 12:00 pipe shed due to bad hardbanding. Losses per tour=38bbls OA annulus=140psi @ 8:00 11/7/2019 11/7/2019 1.50 PROD1 DRILL BHAH T MU Milling Assembly BHA#5 as per 0.0 300.0 12:00 13:30 Baker Rep fr surface to 300'MD, PU/SP=54K/53K 11/7/2019 11/7/2019 4.50 PROD1 DRILL PULD T TIH from 300' to 3200'w/ 14 doubles 300.0 3,200.0 13:30 18:00 and 66 singles from pipeshed. PU/SO=79K/66K, monitor holefill and fill every 20 stads 11/7/2019 11/7/2019 5.50 PROD1 DRILL TRIP T Continue TIH fr 3200' to 15,202'MD, 3,200.0 15,202.0 18:00 23:30 w/ 4" DP from derrick, PU/SO= 1 74K/77K, monitor hole fill and fill every 20 stds 11/7/2019 11/8/2019 0.50 PROD1 DRILL OWFF T OWFF - Simops - PJSM for pulling trip 15,202.0 15,202.0 23:30 00:00 nipple and running RCD bearing, pull PS -21's Tour Losses=26bbls Acc. Losses for hole section1221 bbls 11/8/2019 11/8/2019 0.50 PROD1 DRILL MPDA T PJSM for pulling trip nipple and 15,202.0 15,202.0 00:00 00:30 running RCD bearing, pull PS -21's 11/8/2019 11/8/2019 2.00 PROD1 DRILL DISP T Displace well 9.4ppg brine to 9.Oppg 15,202.0 15,202.0 00:30 02:30 FloPro, at 271 gpm 1250psi 14% flow PU/SO= 180klbs/103klbs, 6,783 stks, Blow down top drive. 11/8/2019 11/8/2019 3.50 PROD1 DRILL SMPD T Strip in hole from 15,202' MD to 15,202.0 19,400.0 02:30 06:00 19,400' MD, w/ 4" DP from derrick, PU/SO=198klbs/90klbs, monitor hole fill and fill every 20 stds 11/8/2019 11/8/2019 6.00 PROD1 DRILL SMPD T Continue Strip in hole from 19,400' 19,400.0 26,470.0 06:00 12:00 MD to 26,470' MD, w/ 4" DP from derrick, PU/SO=212klbs/72klbs, monitor hole fill and fill every 20 stds 11/8/2019 11/8/2019 0.25 PROD1 DRILL WASH T Wash and ream from 26,470'MD- 26,470.0 26,477.0 12:00 12:15 26,477'MD, 4-6bpm, 1395-2150psi, 80rpm, 12k TQ, 15% FO. Break in new bearing at 40rpm, prior to washing down, tag bottom at 26,477'MD with 5K weight down. 11/8/2019 11/8/2019 5.75 PROD1 DRILL MILL T Mill as per Baker rep Clint, 26,481'MD, 26,477.0 26,481.0 12:15 18:00 4-6bpm, 1395-2150psi, 80-140rpm, 12 -17k TQ, 15% FO, work pipe as directed. No depth progress. Page 30/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/8/2019 11/8/2019 1.50 PROD1 DRILL MILL T Mill as per Baker rep Clint, 26,481'MD, 26,481.0 26,481.0 18:00 19:30 2-6bpm, 895-1410psi, 80-140rpm, 16K -18K TQ, 15% FO, W0B=16-18K, work pipe as directed. No depth progress. 11/8/2019 11/8/2019 0.50 PROD1 DRILL RGRP T Serviced rig, changed out leaking 26,481.0 26,481.0 19:30 20:00 1washpipe. 11/8/2019 11/9/2019 4.00 PROD1 DRILL MILL T Mill as per Baker rep Clint, 26,481'MD, 26,481.0 26,481.0 20:00 00:00 6bpm, 1410psi,140rpm, 16K -18K TQ, 15% FO, WOB=18K, work pipe as directed. Worked and hit bottom hard over 40 times, pumped two 25bbl hi - vis nut plug sweeps. No depth progress. 11/9/2019 11/9/2019 1.50 PROD1 DRILL MILL T Mill as per Baker rep Clint, 26,481'MD, 26,481.0 26,481.0 00:00 01:30 6bpm, 1410psi,140rpm, 18klbs-20klbs TQ, 15% FO, WOB= 1 8-20klbs, work pipe as directed. No depth progress. 11/9/2019 11/9/2019 0.50 PROD1 DRILL CIRC T Slow pump rates at 26,400' MD 26,481.0 26,481.0 01:30 02:00 7,860'TVD 9.2ppg mud #1 pump 20spm 700psi 30spm 900psi #2 pump 20spm 705psi 30spm 910psi Flow check (static), Blow down top drive 11/9/2019 11/9/2019 4.00 PROD1 DRILL SMPD T SOOH from 26,481'MD to 23,180' MD 26,481.0 23,180.0 02:00 06:00 with 4" Drill Pipe. PU Wt: 215klbs; holding back pressure via MPD, 50 psi in slips, 320 psi out of slips. 11/9/2019 11/9/2019 6.00 PROD1 DRILL SMPD T Continue SOOH from 23,180' MD to 23,180.0 17,955.0 06:00 12:00 17,955' MD with 4" Drill Pipe. PU Wt=210klbs,holding back pressure via MPD, 50 psi in slips, 320 psi out of slips. 11/9/2019 11/9/2019 2.50 PROD1 DRILL SMPD T Continue SOOH from 17,955' MD to 17,955.0 15,265.0 12:00 14:30 15,265' MD with 4" Drill Pipe. PU Wt=196klbs, holding back pressure via MPD, 50 psi in slips, 320 psi out of slips. 11/9/2019 11/9/2019 2.25 PROD1 DRILL DISP T Displace 9.0 ppg FloPro with 9.4 ppg 15,265.0 15,265.0 14:30 16:45 Brine @ 15,265' MD. Circulate @ 252 gpm, 935 psi, 15% Flow, 11/9/2019 11/9/2019 1.00 PROD1 DRILL SLPC T Slip and cut 15 wraps (120'), calibrate 15,265.0 15,265.0 16:45 17:45 blocks-Simops OWFF (very little vac) 11/9/2019 11/9/2019 0.25 PROD1 DRILL SMPD T Continue SOOH from 15,265' MD- 15,265.0 15,169.0 17:45 18:00 15,169'MD with 4" Drill Pipe. PU Wt: 196klbs; holding back pressure via MPD, 50 psi in slips, 320 psi out of slips. 11/9/2019 11/10/2019 6.00 PROD1 DRILL SMPD T Continue, SOON, from 15,169'MD to 15,169.0 5,637.0 18:00 00:00 5,637'MD on MPD pressures 40psi in slips/160psi out of slips, PU wt=120K 11/10/2019 11/10/2019 4.00 PROD1 DRILL SMPD T Continue to SOOH 5,675'MD- 5,675.0 420.0 00:00 04:00 420'MD, MPD prtessures 50/420psi, PU Wt=120k 11/10/2019 11/10/2019 0.25 PROD1 DRILL OWFF T OWFF, SIMOPS=PJSM on pulling 420.0 420.0 04:00 04:15 RCD bearing and running trip nipple. 11/10/2019 11/10/2019 0.75 PROD1 DRILL MPDA T Pull RCD bearing, install trip nipple 420.0 420.0 04:15 05:00 and fill line. 11/10/2019 11/10/2019 1.00 PROD1 DRILL BHAH T Lay down milling BHA assembly from 420.0 200.0 05:00 06:00 420'-200'. Page 31151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/10/2019 11/10/2019 0.75 PROD1 DRILL BHAH T Continue laying down BHA. Some 200.0 0.0 06:00 06:45 metal recovered on magnets including 2 oz+junk sub piece. Mill tip good, sand formation abrasion observed on remaining surface and sides. 11/10/2019 11/10/2019 0.75 PROD1 DRILL BHAH T Clean and clear rig floor. Prepare to 0.0 0.0 06:45 07:30 PU new RSS drilling BHA. 11/10/2019 11/10/2019 0.50 PROD1 DRILL SVRG T Service top-drive, blocks, ST-80 iron 0.0 0.0 07:30 08:00 roughneck, and PS-21 slips. 11/10/2019 11/10/2019 2.00 PROD1 DRILL BHAH T MU new RSS drilling BHA as per DD 0.0 350.0 08:00 10:00 from surface to 350'MD. 11/10/2019 11/10/2019 2.00 PROD1 DRILL TRIP T TIH from 350' to 2,201'MD w/ 4", 350.0 2,201.0 10:00 12:00 shallow test Schlum tools, 250gpm, 1034psi, 15% FO, PU/SO=76K/63K. Losses for tour=41 bbls 11/10/2019 11/10/2019 6.00 PROD1 DRILL TRIP T Continue RIH from 2201' to 7811'. 2,201.0 7,811.0 12:00 18:00 PU/SO=1 1 3K/97K. Fill pipe every 20 stds, LD and swap in any bad hard banded joits 11/10/2019 11/10/2019 1.75 PROD1 DRILL TRIP T Continue RIH from 7,87to10,300'. 7,811.0 10,300.0 18:00 19:45 PU/SO=113K/97K. Fill pipe every 20 stds, LD and swap in any bad hard banded joints. 11/10/2019 11/11/2019 4.25 PROD1 DRILL TRIP T Pump to Downlink turn on and begin 10,300.0 13,050.0 19:45 00:00 Sonic logging down at 1,OOOfph from 10,300'MD to 13,050'MD. Monitor hole displacement, fill every 20 stands, lay down bad hard banded joints and swap in good joints. SO wt= 112k at 11,950'MD. Losses for tour=80bbls Accumulated losses for hole section= 1527bbls OA Pressure = 140psi at 22:30 hrs Culled Total of 13 joints, 4", 14ppf, bad hardbanded joints 11/11/2019 11/11/2019 5.75 PROD1 DRILL DLOG T Continue RIH while sonic scope 13,050.0 15,237.0 00:00 05:45 logging (memory) from 13,050'MD to 15,237'MD. GR circulating, slacking off and rotating passes completed for PIP tag confirmation, A sand depth confirmation and sonic cement evaluation. PIP at 14,178'MD slacking off, 14,176'MD rotating. (Good correlation to initial logged depth.) 11/11/2019 11/11/2019 1.00 PROD1 DRILL SLPC T Slip and cut drill line, 5 wraps (44ft). 15,237.0 15,237.0 05:45 06:45 Calibrate Schlum Hookload and block height. SIMOPS - OWFF 11/11/2019 11/11/2019 1.00 PROD1 DRILL MPDA T Pull trip nipple and install RCD bearing 15,237.0 15,237.0 06:45 07:45 as per MPD. Function test MPD chokes, Conduct Weekly BOP Function test. 11/11/2019 11/11/2019 2.25 PROD1 DRILL DISP T Displace well from 9.4ppg brine to 15,237.0 15,237.0 07:45 10:00 9.Oppg Flo Pro at 15,237'MD. 6bpm, 1760psi, 13% FO, PU/SO=113K/96K. Gather SPR's. Page 32/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) _. . CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/11/2019 11/11/2019 0.50 PR551 DRILL DLOG T Continue sonic logging at 1,OOOfph, 15,237.0 15,423.0 10:00 10:30 from 15,237'MD to 15,423'MD. PU/S0=113K/96K, Downlink to turn off Schlum tools. 11/11/2019 11/11/2019 1.50 PROD1 DRILL TRIP T RIH from 15,423'MD-16,913'MD, with 15,423.0 16,913.0 10:30 12:00 4" DP from derrick, PU/S0=113K/97K, monitor displacement on trip tank. 11/11/2019 11/11/2019 6.00 PROD1 DRILL TRIP T Continue RIH from 16,913'MD to 16,913.0 25,303.0 12:00 18:00 25,303'MD, PU/S0=212K/85K, monitor displacement, fill pipe every 20 stds Tour Losses=51 bbls 11/11/2019 11/11/2019 1.50 PROD1 DRILL TRIP T Continue RIH from 25,203'MD- 25,303.0 26,439.0 18:00 19:30 26,439'MD, PU/S0=214K/92K, monitor displacement, fill pipe every 20 stds 11/11/2019 11/11/2019 1.25 PROD1 DRILL DHEQ T Perform Schlum Downlinks. Establish 26,439.0 26,480.0 19:30 20:45 drilling parameters and wash to bottom. Observed tag up at 26,480' with torque to 15K on bottom, 12K off bottom 26,477'MD. Pump pressure 2920/2900psi on/off bottom, PU/SO/RTG=214K/92K/139K lbs 11/11/2019 11/12/2019 3.25 PROD1 DRILL DDRL P Drill 6 1/2" production hole from 26,480.0 26,721.0 20:45 00:00 26,480'MD-26,721'MD (7,862'TVD), PSI=2930psi, RPM=100-140, On/Off TQ=19K/12K, FO=16%, ECD=10.65ppg, P U /S O/RTG =214 K/93 K/ 139 K, ADT=2.18hrs, Total bit HRS=2.18 Tour Losses=66bbls 11/12/2019 11/12/2019 6.00 PROD1 DRILL DDRL P Drill 6 1/2" production hole from 26,721.0 27,387.0 00:00 06:00 26,721' MD -27,387' MD (7,872'TVD), WOB=17K, 260 gpm, PSI=3270psi, RPM=100-140, On/Off TQ=21 K/1 8K, FO=16%, ECD=11.32ppg, PU/SO/RTG=200 K/87 K/140 K, ADT=4.54hrs, Total bit HRS=6.72, Jars=151.58hrs 11/12/2019 11/12/2019 6.00 PROD1 DRILL DDRL P Drill 6 1/2" production hole from 27,387.0 27,958.0 06:00 12:00 27,387' MD -27,958' MD (7,879'TVD), WOB=17K, 270gpm PSI=3,430psi, RPM= 80-100, On/Off TQ=20K/14K, FO=16%, ECD=11.Oppg, PU/SO/RTG=210K/76K/141 K, ADT=4.26hrs, Total bit HRS=10.98, Jars = 155.84hrs Tour Losses=55bbls 11/12/2019 11/12/2019 6.00 PROD1 DRILL DDRL P Drill 6 1/2" production hole from 27,958.0 28,420.0 12:00 18:00 27,958' MD -28,420' MD (7,879'TVD), WOB=17K, 270gpm, PSI=3,494psi, RPM= 80-100, On/Off TQ=20K/14K, FO=16%, ECD=11.16ppg, PU/SO/RTG=201 K/NA/141 K, Pumped 30/30bbls, to/hi vis sweeps at 28,240'MD ADT=3.92hrs, Total bit HRS=14.90, Jars = 159.76 MPD@28,339'MD=5psi drilling, closing chokes on connections build to 12psi, Max Peak Gas=80units Page 33/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/12/2019 11/12/2019 5.00 PROD1 DRILL DDRL P Drill 6 1/2" production hole from 28,420.0 28,815.0 18:00 23:00 28,420' MD, 28,815MD (7,882'TVD), WOB=17K, 260gpm, PSI=3,275psi, RPM= 100, On/Off TQ=21 K/1 4K, FO=16%, ECD=10.95pp9, P U/SO/RTG=200 K/NA/ 144 K, ADT=3.12hrs, Total bit HRS=18.02, Jars = 162.88 Tour Losses=86bbls 11/12/2019 11/13/2019 1.00 PROD1 DRILL DDRL T Trouble shoot SLB tools. Lost signal to 28,815.0 28,815.0 23:00 00:00 tools. change mud pumps, add mud dilution, cycle pumps. 11/13/2019 11/13/2019 0.50 PROD1 DRILL DDRL T Continue dilution, trouble shoot MWD 28,815.0 28,815.0 00:00 00:30 signal transmission. 11/13/2019 11/13/2019 5.50 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 28,815.0 29,291.0 00:30 06:00 28,815'MD-29,291'MD (7,887'TVD), WOB=17K, 270gpm, 3580psi, 100rpm, TQ on/off=21k/14k, 16% FO, ECD=11.19ppg, PU/SO/RTG=198K/NA/143K MPD closing chokes on connections, pumped 29/20bbls to -hi vis sweeps at 29,195'MD, Dump and Dilute 275bbls at 28,816'MD. ADT=3.54hrs, Total Bit=21.56hrs, Total Jar=166.42hrs 11/13/2019 11/13/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 29,291.0 29,789.0 06:00 12:00 29,291'MD-29,789'MD (7,8917VD), WOB=17K, 270gpm, 3482psi, 80rpm, TQ on/off=21.5k/15k, 15% FO, ECD=10.91 ppg, P U/S O/ RTG=197 K/N A/ 143 K. Pumped 30/30 to/hi vis sweeps at 29,673'MD. MPD closing chokes on connections. ADT=3.62hrs, Total Bit=25.18hrs, Total Jar=170.04hrs Mud Losses for 12 tour=73bbls 11/13/2019 11/13/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 29,789.0 30,340.0 12:00 18:00 29,789'MD-30,340'MD (7,897'TVD), WOB=17K, 270gpm, 3482psi, 80rpm, TQ on/off=21.5k/15k, 15% FO, ECD=10.91 ppg, P U /S O/RTG =197 K/ NA/ 143 K. MPD closing chokes on connections. ADT=3.70hrs, Total Bit=28.88hrs, Total Jar=173.74hrs Mud Losses for 12 tour=73bbls 11/13/2019 11/14/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 30,340.0 30,721.0 18:00 00:00 30,340'MD-30,721'MD (7,9007VD), WOB=17K, 270gpm, 3760psi, 100rpm, TQ on/off=22K/15K, 15% FO, ECD=11.18ppg, P U/SO/RTG=205 K/NA/ 144 K. MPD closing chokes on connections. Pumped 30/30 to/hi vis sweeps at 30,721'MD. ADT=3.34hrs, Total Bit=25.18hrs, Total Jar=177.08hrs Mud Losses for 12 tour= 100bbls Page 34/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/14/2019 11/14/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 30,721.0 31,006.0 00:00 06:00 From 30,721' MD To 31,006'MD (7,903'TVD), W013=17K, 270gpm, 3910psi, 100rpm, TQ on/off=22K/15K, 15% FO, ECD=11.22ppg, P U/SO/RTG=205 K/NA/ 144 K. MPD closing chokes on connections. Pumped 20/20 to/hi vis sweeps at 30,721'MD. ADT=1.93hrs, Total Bit=34.15hrs, Total Jar=179,01 hrs 11/14/2019 11/14/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 31,006.0 31,483.0 06:00 12:00 From 31,006' MD To 31,483'MD (7,907'TVD), W06=16K, 270gpm, 3835psi, 100rpm, TQ on/off=22K/15K, 15% FO, ECD=11.29ppg, P U/SO/RTG=205 K/NA/ 144 K. MPD closing chokes on connections. ADT=3.38hrs, Total Bit=37.53hrs, Total Jar=182.39hrs Mud Losses for 12 tour=140bbls 11/14/2019 11/14/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 31,483.0 31,803.0 12:00 18:00 From 31,483' MD To 31,803'MD (7,914'TVD), W013=16K, 270gpm, 3850psi, 100rpm, TQ on/off=22K/15K, 15% FO, ECD=11.22ppg, PU/SO/RTG=205K/NA/144K. MPD closing chokes on connections. ADT=2.47hrs, Total Bit=40.00hrs, Jars=184.56hrs 11/14/2019 11/15/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 31,803.0 32,246.0 18:00 00:00 From 31,803'MD-32,246'MD (7,920'TVD), W013=18K, 270gpm, 4055psi, 90rpm, TQ on/off=23K/15K, 15% FO, ECD=11.44ppg, P U/S O/ RTG=206 K/ N A/ 142 K. MPD closing chokes on connections. ADT=3.40hrs, Total Bit=43.40hrs, Jars=188.26hrs Mud Losses for 12 tour=123bbls 11/15/2019 11/15/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 32,246.0 32,627.0 00:00 06:00 From 32,246' MD-32,627'MD (7,924'TVD), WOB=18K, 2709pm, 3760psi, 90rpm, TQ on/off=23K/15K, 15% FO, ECD=11.34ppg, P U/S O/ RTG=204 K/ N A/ 144 K. MPD closing chokes on connections. ADT=3.03hrs, Total Bit=46.43hrs, Jars=191.29hrs Page 35/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/15/2019 11/15/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 32,627.0 33,007.0 06:00 12:00 From 32,627' MD-33,007'MD (7,925'TVD), WO6=18K, 270gpm, 3960psi, 90rpm, TQ on/off=23K/15K, 15% FO, ECD=11.36ppg, P U/SO/RTG=209 K/NA/ 144 K. MPD closing chokes on connections. ADT=2.81 hrs, Total Bit=49.24hrs, Jars=194.10hrs Mud Losses for 12 tour=181 bbls 11/15/2019 11/15/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 33,007.0 33,420.0 12:00 18:00 From 33,007' MD-33,420'MD (7931 'TVD), W0B=13K, 270gpm, 4053psi, 90rpm, TQ on/off=23K/16K, 14% FO, ECD=11.26ppg, P U/SO/RTG=224K/NA/148 K. MPD closing chokes on connections. ADT=3.63hrs, Total Bit=52.87hrs, Jars=197.73hrs. 275bbls dump and dilute 9.Oppg at 33,102'MD 11/15/2019 11/15/2019 5.50 PROD1 DRILL DDRL P Continue to drill 6 1/2" production hole 33,420.0 33,768.0 18:00 23:30 From 33,420'MD-33,768"MD (7943 -TVD), WOB=14K, 270gpm, 4032psi, 90rpm, TQ on/off=22K/16K, 14% FO, ECD=11.16ppg, P U/SO/RTG=224K/NA/148K. MPD closing chokes on connections. ADT=2.92hrs, Total Bit=55.79hrs, Jars=200.65hrs. FINAL TD REACHED 33,768'MD (7943 -TVD) 11/15/2019 11/16/2019 0.50 PROD1 CASING CIRC P Pump 30bbIsHV sweep, power down 33,768.0 33,768.0 23:30 00:00 Schlumberger tools as per DD. Circulate and condition mud at 270gpm, 4000psi, 80rpm, FO=14%, ECD=11.25.prior to Fingerprint Drawdown, final bottoms up and BROCK 11/16/2019 11/16/2019 4.25 PROD1 CASING CIRC P Continue C&C, rotate and reciprocate, 33,767.0 33,677.0 00:00 04:15 33,767@270gpm, 4020psi, 80rpm, 148K rtg wt, 14%FO. 11.25ppg ECD, 13,030 total strokes. Rack back stand, fingerprint MPD Build ups at 33,677'MD, Initial capture 220psi, BU's 80, 37, 15, 6 psi, formation balanced or less. 11/16/2019 11/16/2019 2.75 PROD1 CASING CIRC P Circ BU, rtg and circ. 33,677'MD- 33,677.0 33,580.0 04:15 07:00 33,580' MD, 270gpm, 4025psi, 14% FO, 120rpm (for better hole cleaning), 19.5k TQ, 11.16ppg ECD, 148k rtg wt BROOH @ 33,360'= 500'/hr. Page 36/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) _ CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/16/2019 11/16/2019 5.00 PROD1 CASING BKRM P BROOH 33580'MD - 32,341'MD, 33,580.0 32,341.0 07:00 12:00 270gpm, 3870psi, 80rpm, 17K TQ, 14%FO, 11.1 ppg ECD, PU/SO/RTG wt's 212K/NA/149K Dropped 2.30" Hollow drift with 120' wire tail. BROOH @ 32,900'= 7507hr. Tour Losses=136bbl 11/16/2019 11/16/2019 6.00 PROD1 CASING BKRM P BROOH from 32,341'MD-30,437'MD, 32,341.0 30,437.0 12:00 18:00 270gpm, 3630psi, 80rpm, 17K TQ, 14% FO, 10.89ppg ECD, PU/RTG=206K/143K. BROOH @ 31,780'= 10007hr. BROOH @ 31,200'= 12507hr BROOH @ 30,800'= 15007hr 11/16/2019 11/17/2019 6.00 PROD1 CASING BKRM P BROOH from 30,437'MD-27,770'MD, 30,437.0 27,770.0 18:00 00:00 270gpm, 3425psi, 80rpm, 16K TQ, 14% FO, 10.82ppg ECD, PU/RTG=204K/142K. Attempt to Strip in the hole at 28,000MD, still no down weight available. 116bbis-Losses this tour 11/17/2019 11/17/2019 4.00 PROD1 CASING BKRM P BROOH from 27,770'MD-26,445'MD, 27,770.0 26,445.0 00:00 04:00 270gpm, 3325psi, 80rpm, 15.5K TQ, 14%FO, 10.80ppg ECD, At 26,445'MD, blow down top -drive, grease washpipe ready to SOOH. 1 st attempt to Strip in the hole at 27,000'MD, no go with 68K down weight, 142K rtg wt PU wt=224k lbs at 25,600'MD. 11/17/2019 11/17/2019 2.00 PROD1 CASING SMPD P SOOH from 26,445' MD-24,924'MD 26,445.0 24,924.0 04:00 06:00 with 4" Drill Pipe. PU Wt: 224klbs; holding back pressure via MPD, 80 psi in slips, 211 psi out of slips @ 15007hr Max overpull 5klbs. 11/17/2019 11/17/2019 6.00 PROD1 CASING SMPD P SOOH from 24,924' MD-18,617'MD 24,924.0 18,617.0 06:00 12:00 with 4" Drill Pipe. PU Wt: 207k1bs; SO Wt: 95klbs. holding back pressure via MPD, 80 psi in slips, 260 psi out of slips@ 25007hr. Tour losses=71bbls 11/17/2019 11/17/2019 1.50 PROD1 CASING SMPD P SOOH from 18,617'MD-17,446'MD 18,617.0 17,446.0 12:00 13:30 with 4" Drill Pipe. PU Wt: 206klbs; SO Wt: 94klbs. holding back pressure via MPD, 80 psi in slips, 260 psi out of slips 11/17/2019 11/17/2019 2.50 PROD1 CASING DISP P Hold PJSM, displace 9.Oppg Flo Pro 17,446.0 17,446.0 13:30 16:00 mud to 9.5ppg brine, 250gpm, 1643psi, 50rpm, 9K TQ, 10% FO, PU/SO=199K/88K, total 7945stks 11/17/2019 11/17/2019 0.50 PROD1 CASING OWFF P OWFF (static) 17,446.0 17,446.0 16:00 16:30 11/17/2019 11/17/2019 1.50 PROD1 CASING SMPD P SOOH from 17,446'MD-16,119'MD 17,446.0 16,119.0 16:30 18:00 with 4" Drill Pipe. PU Wt: 208klbs; SO Wt: 101 klbs. holding back pressure via MPD, 80 psi in slips, 260 psi out of slips Page 37/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftK8) 11/17/2019 11/17/2019 1.75 PROD1 CASING SMPD P SOOH from 16,119'MD-15,150'MD 16,119.0 15,150.0 18:00 19:45 with 4" Drill Pipe. PU Wt: 208klbs; SO Wt: 101 klbs. holding back pressure via MPD, 80 psi in slips, 260 psi out of slips 11/17/2019 11/17/2019 1.25 PROD1 CASING SLPC P Inside 7 5/8" int. casing shoe, Slip and 15,150.0 15,150.0 19:45 21:00 Cut Drill Line (164'), SIMOPS - OWFF for 10 min, calibrated Amphion/Totco, 11/17/2019 11/18/2019 3.00 PROD1 CASING SMPD P SOOH from 15,150'MD-11,450'MD 15,150.0 11,450.0 21:00 00:00 with 4" Drill Pipe. PU Wt: 170klbs; SO Wt: 100k1bs. holding back pressure via MPD, 170gpm going thru MPD choke, 80 psi in slips, 260 psi out of slips, FO=10% 11/18/2019 11/18/2019 6.00 PROM CASING SMPD P SOOH 15,150'MD-4,844'MD, MPD at 11,450.0 4,844.0 00:00 06:00 170gpm, out of slips 260psi, in slips=80psi, FO=10%, PU/SP=115K/98K, laying down culled bad hard banded DP as identified. Total jts laid down=31 so far. 11/18/2019 11/18/2019 6.00 PROM CASING SMPD P SOOH 4,844'MD-445'MD, under MPD 4,844.0 445.0 06:00 12:00 at 170gpm, out of slips 260psi, in slips=80psi, FO=10%, PU/SP=52K/56K, laying down culled bad hard banded DP as identified. Laid out total of 102jts, 56 culled for hardbanding (total 88 outside) and 28 jts left in pipe shed magazines. 11/18/2019 11/18/2019 0.50 PROM CASING OWFF P OWFF before pulling RCD bearing. 445.0 445.0 12:00 12:30 11/18/2019 11/18/2019 1.00 PROM CASING MPDA P PJSM, pull RCD bearing. 445.0 445.0 12:30 13:30 11/18/2019 11/18/2019 3.00 PROM CASING BHAH P PJSM, LD BHA from 445' -surface. 445.0 0.0 13:30 16:30 11/18/2019 11/18/2019 0.75 PROM CASING BHAH P Clear and clean rig floor on non- 0.0 0.0 16:30 17:15 essential BHA equipment and tools. 11/18/2019 11/18/2019 1.75 PROM WHDBOP RURD P R/U to Test BOP's. 0.0 0.0 17:15 19:00 Page 38/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/18/2019 11/19/2019 5.00 PROD1 WHDBOP BOPE P Test BOP's, 250 low/3500psi high for 0.0 0.0 19:00 00:00 all charted with exception of manual operated and super choke tested to 250/2000psi for charted 5 minutes. Using 4" test joint, tested annular, 2 7/8" x 5 1/2" UPR, with 4 1/2" test joint, tested 2 7/8" x 5 1/2" UPR, and 2 7/8" x 5 1/2" LPR, tested choke valves 1-15, manual operated and super choke, choke and kill manuals and HCR's, 4" valve on kill line, 4" FOSV, 4" dart valve, upper and lower IBOP, blind shear rams, perform Koomey drawdown, ACC=3000psi, manifold= 1550psi. Acc=1600psi after all functions on bottles only,Average pressure remaining on 6 bottles=1908psi. 14 sec's to build 200psi, with 2 electric pumps, 102secs to full system pressure with 2 electric and 2 air pumps. Closing times, annular=23secs, UPR=18secs, blind/shear rams= 16secs, LPR=16secs, choke HCR=2 sec's, kill HCR=2sec, tested PVT gain/loss and flow out alarms, LEL and 1-12S alarms. AOGCC witness waived by Jeff Jones 06:47 11-16-2019 - BOP Testing operations completed 01:00, 11-19- 2019 11/19/2019 11/19/2019 1.00 PROD1 WHDBOP BOPE P Completed BOP testing, All primary 0.0 0.0 00:00 01:00 and secondary BOPE controls, Koomey and driller's station were tested. All tests passed initial inspection. 11/19/2019 11/19/2019 0.50 PROD1 WHDBOP RURD P Rig down testing equipment and blow 0.0 0.0 01:00 01:30 down top drive, test pump, kill line, choke line, choke manifold and gas buster. 11/19/2019 11/19/2019 0.75 PROD1 WHDBOP MPSP P Pull test plug, install wear ring as per 0.0 0.0 01:30 02:15 FMC rep, RILDS on 6.875" wear ring. Line up hole fill and fill BOP stack. 14 bbls to fill. 11/19/2019 11/19/2019 3.75 COMPZ1 CASING PULD P Make up ported bull nose to avoid 0.0 3,115.0 02:15 06:00 damage to HWDP pin end, pick up and makeup 96 singles of 4" HWDP from shed and rack in derrick for liner running string weight. Drift all on the skate with 2.3" drift and manually strap displacement every 9 joints. PU/SO= 1 04k/84K at 3125'. 11/19/2019 11/19/2019 2.00 COMPZI CASING TRIP P POOH on elevators, from 3,115' to 3,115.0 0.0 06:00 08:00 surface. 11/19/2019 11/19/2019 0.50 COMPZ1 CASING RURD P R/U to run 4.5", 12.6 ppf, L80, Hyd 0.0 0.0 08:00 08:30 563 Frac liner as per detail. 11/19/2019 11/19/2019 3.50 COMPZI CASING PUTB P Conduct team PJSM in the office , run 0.0 2,032.0 08:30 12:00 4 1/2", 12.6 ppf, L-80, Hyd 563A lateral liner, from surface to 2,032', PU/SP wts= 59K/66K. Losses for tour=58bbls, OA pressure=160psi. Page 39151 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/19/2019 11/19/2019 6.00 COMPZ1 CASING PUTB P Pick-up and run 4 1/2", 12.6 ppf, L-80, 2,032.0 7,516.0 12:00 18:00 Hyd 563 A lateral liner, from 2,032'MD- 7,516'MD, PU/SO wts= 101 K/87K. Monitor hole displacement. 11/19/2019 11/20/2019 6.00 COMPZ1 CASING PUTB P Pick-up and run 4 1/2", 12.6 ppf, L-80, 7,516.0 13,155.0 18:00 00:00 Hyd 563 A lateral liner, from 7,516'MD- 13,155'MD, PU/SOwts= 118K/101K. Monitor hole displacement. Losses=20bbls for tour 11/20/2019 11/20/2019 6.00 COMPZ1 CASING PUTB P Continued to TIH w/ "A" Lateral 4.5" 13,155.0 18,128.0 00:00 06:00 12.6ppf L-80 H563 frac liner from 13,155' MD to 18,128' MD. P/U Wt = 171 klbs, and S/0 Wt = 98 klbs. Monitored displacement on pit #4. Gathered circulating parameters while at the shoe at 15,220' MD: 1 bpm = 124 psi, 1.5 bpm = 145 pis, and 2 bpm = 170 psi. A total of 6.5 bbls of volume was pumped. Attempted to rotate at 5 k (Not successful). P/U Wt = 162 klbs, S/0 Wt = 99 klbs. 11/20/2019 11/20/2019 1.00 COMPZ1 CASING PUTB P Continued to TIH w/ "A" Lateral 4.5" 18,128.0 19,102.0 06:00 07:00 12.6ppf L-80 H563 frac liner from 18,128' MD to 19,102' MD. P/U Wt = 172 klbs, and S/0 Wt = 97 klbs. Monitored displacement on pit #4. 11/20/2019 11/20/2019 1.50 COMPZ1 CASING OTHR P PJSM. M/U Hanger and Seal Bore 19,102.0 19,188.0 07:00 08:30 Extension (X/0 to DP) from 19,102' MD to 19, i 88' MD. P/U Wt = 172 klbs, S/0 Wt = 97 klbs, Rot Wt = 156 klbs, Rotary= 10 rpm,. Monitored displacement on pit #4. 11/20/2019 11/20/2019 3.50 COMPZ1 CASING RUNL P Continued to TIH on DP w/ "A" Lateral 19,188.0 22,577.0 08:30 12:00 4.5" 12.6ppf L-80 H563 frac liner from 19,188' MD to 22,577' MD. P/U Wt = 183 klbs, and S/0 Wt = 93 klbs. Monitored displacement on pit #4. 11/20/2019 11/20/2019 3.00 COMPZ1 CASING RUNL P Continued to TIH on 14 ppf 4" DP from 22,577.0 26,276.0 12:00 15:00 the derrick from 22,577' MD to 26,276' MD. Monitored displacement on pit #4. 11/20/2019 11/20/2019 3.00 COMPZ1 CASING RUNL P Continued to TIH on 15.7 ppf 4" DP 26,276.0 28,380.0 15:00 18:00 from the derrick from 26,276' MD to 28,380' MD. P/U Wt = 210 klbs. Monitored displacement on pit #4. Encountered tight spot at 28,380' MD. Attempted to work through at GPM = 84 gpm, SPP = 700 psi, Rotary = 10 rpm, and TQ = 13 kftlbs. 11/20/2019 11/20/2019 2.00 COMPZ1 CASING RUNL T Worked through tight spot at 28,380' 28,380.0 28,380.0 18:00 20:00 MD. Pumped 84-126 gpm w/ SPP = 710-968 psi, Rotary 2-0-30 rpm. Broke through tight spot and attempted to TIH on elevators w/ no success. Attempted to pump in hole with no success. P/U Wt = 214 klbs, S/0 Wt = 42 klbs, and Rot = 143 klbs. Page 40/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/20/2019 11/21/2019 4.00 COMPZ1 CASING RUNL P Rotated 4 1/2" liner in hole from 28,380.0 29,775.0 20:00 00:00 28,380' MD to 29,775' MD w/ 5 stands of 4" HWDP from the derrick followed by 15.7 ppf 4" DP. Rotary = 20 rpm, GPM = 84 gpm, SPP = 675 psi, and TQ = 12-15kftlbs. Worked pipe through tight spots. Note* filled active w/ 9.0 ppg FloPro and displaced drillstring on the fly while rotating pipe down. 11/21/2019 11/21/2019 6.00 COMPZ1 CASING RUNL P Rotated 4 1/2" liner in hole from 29,775.0 32,035.0 00:00 06:00 28,775' MD to 32,035' MD w/ stands of 15.7 ppf 4" DP and 4" HWDP. Rotary = 20 rpm, GPM = 84 gpm, SPP = 775 psi, and TQ = 12-15kftlbs. Rot Wt = 149 klbs. 26 bph loss rate at 2 bpm while rotating string in hole. Note* filled active w/ 9.0 ppg FloPro and displaced drillstring on the fly while rotating pipe down. 11/21/2019 11/21/2019 5.00 COMPZ1 CASING RUNL P Rotated 4 1/2" liner in hole from 32,035.0 33,725.0 06:00 11:00 32,035' MD to 33,725' MD w/ stands of 15.7 ppf 4" DP and 4" HWDP. Rotary = 20 rpm, GPM = 84 gpm, SPP = 775 psi, and TQ = 16 kftlbs. Rot Wt = 131 klbs. Note* filled active w/ 9.0 ppg FloPro and displaced drillstring on the fly while rotating pipe down. 11/21/2019 11/21/2019 1.50 COMPZ1 CASING HOSO P Dropped 1.5" setting ball. Pumped 33,725.0 33,735.0 11:00 12:30 down at 84 gpm w/ 900 psi. Ball set at 1,085 strokes. Pressured up to 2,500 psi to set hanger. Sat down 50 klbs to confirm that the hanger was set. Pressured up to 4,000 psi to release. P/U to string weight 204 klbs + 5'. Set down 50 klbs to set packer in place. P/U to string weight 204 klbs + 5'. Rotated at 15 rpm (TQ = 7.5 kftlbs) and sat down 50 klbs to ensure weight transfer. Liner set in place at 33,735' MD. Top of Liner is at 14,593' MD. 11/21/2019 11/21/2019 1.00 COMPZ1 CASING PACK P Tested liner top packer to 2,500 psi 33,735.0 33,735.0 12:30 13:30 (Charted). Total strokes = 38. 11/21/2019 11/21/2019 0.75 COMPZ1 WELLPR OWFF P OWFF (Static). 33,735.0 33,735.0 13:30 14:15 11/21/2019 11/21/2019 3.75 COMPZ1 WELLPR TRIP P POOH from 14,394' MD to 10,877' MD 14,394.0 10,877.0 14:15 18:00 w/ 4" DP (Racking back in the derrick). P/U Wt = 159 klbs. Monitored displacement on trip tanks. 11/21/2019 11/21/2019 5.75 COMPZ1 WELLPR TRIP P POOH from 10,877' MD to 154' MD w/ 10,877.0 154.0 18:00 23:45 4" DP (Racking back in the derrick). P/U Wt = 145 klbs @ 8,000' MD. Monitored displacement on trip tanks. 11/21/2019 11/22/2019 0.25 COMPZ1 WELLPR BHAH P PJSM. L/D liner running tool. 154.0 0.0 23:45 00:00 Maintained constant hole fill over the top and monitored trip pit before and after BHA. 11/22/2019 11/22/2019 1.50 COMPZ1 WELLPR BHAH P L/D liner hanger running tools. 0.0 0.0 00:00 01:30 1 I I I Cleaned and cleared the rig floor. Page 41/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/22/2019 11/22/2019 1.25 PROD2 WHPST SLPC P PJSM. Slipped and cut drill line 0.0 0.0 01:30 02:45 (133717 wraps). Calibrated Amphion and Totco. Unspooled additional line from spooler for new spool install. 11/22/2019 11/22/2019 3.25 PROD2 WHPST BHAH P PJSM. P/U Whipstock BHA. 0.0 0.0 02:45 06:00 Maintained constant hole fill over the top using the jet pump and monitored returns on Pit #4. 11/22/2019 11/22/2019 1.00 PROD2 WHPST BHAH P PJSM. Continued picking up 0.0 328.0 06:00 07:00 Whipstock/Milling BHA from surface to 328' MD. P/U Wt = 57 klbs, S/O Wt = 62 klbs. Monitored displacement w/ pit #4. 11/22/2019 11/22/2019 5.00 PROD2 WHPST TRIP P PJSM.TIH w/ Whipstock/Milling BHA 328.0 6,594.0 07:00 12:00 from 328' MD to 6,594' MD. P/U Wt = 111 klbs, S/O Wt = 93 klbs. Monitored displacement w/ pit #4. 11/22/2019 11/22/2019 4.00 PROD2 WHPST TRIP P PJSM.TIH w/ Whipstock/Milling BHA 6,594.0 11,535.0 12:00 16:00 from 6,594' MD to 11,535' MD. P/U Wt = 159 klbs, S/O Wt = 121 klbs. Monitored displacement w/ pit #4. 11/22/2019 11/22/2019 1.00 PROD2 WHPST RURD P C/O Saver Sub. 11,535.0 11,535.0 16:00 17:00 11/22/2019 11/22/2019 1.00 PROD2 WHPST TRIP P PJSM.TIH w/ Whipstock/Milling BHA 11,535.0 12,542.0 17:00 18:00 from 11,535' MD to 12,542' MD. P/U Wt = 171 klbs, S/O Wt = 127 klbs. Monitored displacement w/ pit #4. 11/22/2019 11/22/2019 1.50 PROD2 WHPST TRIP P TI w/ Whipstock/Milling BHA from 12,542.0 14,392.0 18:00 19:30 12,542' MD to 14,392' MD w/ 4" from derrick. P/U Wt = 200 klbs, S/O Wt = 154 klbs. Monitored displacement w/ pit #4. Logged R/Atag at 14,180' MD. 11/22/2019 11/22/2019 1.50 PROD2 WHPST WPST P Filled pipe. Oriented whipstock to 44° 14,392.0 14,593.0 19:30 21:00 R GTF. Tagged no go at 14,593' MD. Set 15 klbs downwards. P/U 15 klbs over (X2). Set 30 klbs down to shear the bolt on milling assembly. Top of Whipstock = 14369' Bottom of Whipstock = 14383' 11/22/2019 11/22/2019 0.50 PROD2 WHPST PRTS P Tested packer to 1,000 psi for 10 14,593.0 14,593.0 21:00 21:30 minutes. B/D kill line and shut manuals for milling. 11/22/2019 11/23/2019 2.50 PROD2 WHPST MILL P Mill 6 1/2" window out of 7 5/8" casing 14,369.0 14,373.0 21:30 00:00 from 14369' MD to 14,373' MD. WOB = 3-5 klbs, GPM = 300 gpm, PSI on = 2,550 psi, Rotary = 80 rpm, TQ On = 6 -13 kftlbs, Flow Out = 11 %, 11/23/2019 11/23/2019 4.00 PROD2 WHPST MILL P Mill 6 1/2" window out of 7 5/8" casing 14,373.0 14,394.0 00:00 04:00 from 14,373' MD to 14,394' MD (7,614' TVD). WOB = 3-5 klbs, GPM = 300 gpm, PSI on = 2,550 psi, Rotary = 80- 100 rpm, TQ On = 6-13 kftlbs, Flow Out= 11 %, P/U Wt = 201 klbs, S/O Wt = 155 klbs, and Rot Wt = 201 klbs. Pumped 30 bbls Super Sweep. 11/23/2019 11/23/2019 1.50 PROD2 WHPST MILL P Worked milling BHA through window 14,394.0 14,394.0 04:00 05:30 w/ 100 rpm (X4), No rotation (X2), No Pump and Rotation (X2). Blown down top drive. 11/23/2019 11/23/2019 0.50 PROD2 WHPST OWFF P Pulled into casing and OWFF (Static). 14,394.0 14,351.0 05:30 06:00 Page 42/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/23/2019 11/23/2019 0.75 PROD2 WHPST TRIP P PJSM. POOH from 14,351' MD to 14,351.0 14,069.0 06:00 06:45 14,069' MD w/ 4" DP (Racking back in the derrick). P/U Wt = 204 klbs, and S/O Wt = 156 klbs. Monitored displacement on pit #4. 11/23/2019 11/23/2019 3.75 PROD2 WHPST PULD P PJSM. POOH while L/D 4" HWDP 14,069.0 11,514.0 06:45 10:30 singles to pipe shed from 14,069' MD to 11,514' MD. P/U Wt = 160 klbs, and S/O Wt = 123 klbs. Monitored displacement on pit #4. 11/23/2019 11/23/2019 1.50 PROD2 WHPST TRIP P PJSM. POOH from 11,514' MD to 11,514.0 8,465.0 10:30 12:00 8,465' MD w/ 4" DP (Racking back in the derrick). P/U Wt = 128 klbs, and S/O Wt = 104 klbs. Monitored displacement on trip tank. 11/23/2019 11/23/2019 3.50 PROD2 WHPST TRIP P PJSM. POOH from 8,465' MD to 198' 8,465.0 198.0 12:00 15:30 MD w/ 4" DP (Racking back in the derrick). P/U Wt = 56 klbs, and S/0 Wt = 59 klbs. Monitored displacement on trip tank. 11/23/2019 11/23/2019 1.00 PROD2 WHPST BHAH P PJSM. L/D Milling BHA from 198' MD 198.0 0.0 15:30 16:30 to surface. Monitored displacement on trip tank. 11/23/2019 11/23/2019 1.50 PROD2 WHPSTWWWH P M/U Stack washer w/ magnets and 0.0 0.0 16:30 18:00 flushed stack. 11/23/2019 11/23/2019 2.00 PROD2 WHPSTJPULD BHAH P M/U 6 1/2" Kick Off BHA #8 from 0.0 557.0 18:00 20:00 surface to 557'. 11/23/2019 11/23/2019 2.50 PROD2 WHPST P Single in 4" DP the hole (From pipe 557.0 1,970.0 20:00 22:30 shed) from 557' MD to 1,970' MD. 11/23/2019 11/23/2019 0.50 PROD2 WHPST DHEQ P Shallow tested MWD (Good). GPM = 1,970.0 1,970.0 22:30 23:00 220-270 gpm, SPP = 720-900 psi, and F/0 = 7-13% 11/23/2019 11/24/2019 1.00 PROD2 WHPST TRIP P TIH from 1,970' MD to 4,602' MD w/ 4" 1,970.0 4,602.0 23:00 00:00 DP from the derrick. Filled pipe every 20 stands. P/U Wt = 91 klbs, and S/O Wt = 89 klbs. Monitored displacement on pit #4. 11/24/2019 11/24/2019 5.50 PROD2 WHPST TRIP P TIH from 4,602' MD to 14,299' MD w/ 4,602.0 14,299.0 00:00 05:30 4" DP from the derrick. Filled pipe every 20 stands. P/U Wt = 168 klbs, and S/O Wt = 120 klbs. Monitored displacement on pit #4. 11/24/2019 11/24/2019 0.50 PROD2 WHPST TRIP P Oriented BHA 40 degrees to the right. 14,299.0 14,392.0 05:30 06:00 Shut pumps and tripped through the window. Tagged up at 14,392' MD. 11/24/2019 11/24/2019 4.00 PROD2 DRILL DDRL P Drilled to Kick Off and land in zone 14,392.0 14,450.0 06:00 10:00 from 14,392' MD to 14,450' MD. WOB = 7 klbs, GPM = 250 gpm, SPP On = 1700 psi, Rotary = 40 rpm, TQ On = 7.5 kftlbs, F/O = 13%, P/U Wt = 179 klbs, S/O Wt = 122 klbs, RT Wt = 144 klbs. ADT = 3.68 hrs. AST = 1.44 hrs. and ART = 2.24 hrs 11/24/2019 11/24/2019 2.00 PROD2 DRILL CIRC P CBU. Pumped 40 bbl sweep. TOtal 14,450.0 14,450.0 10:00 12:00 strokes 6,200. 11/24/2019 11/24/2019 0.50 PROD2 DRILL OWFF P OWFF (Static). 14,450.0 14,450.0 12:00 12:30 11/24/2019 11/24/2019 5.50 PROD2 DRILL TRIP P PJSM. POOH from 14,450' MD to 14,450.0 2,001.0 12:30 18:00 2,001 MD w/ 4" DP racked back in the derrick. P/U Wt = 74 klbs, S/O Wt = 80 klbs, Monitored displacement on trip tank. Page 43/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (ftKB) 11/24/2019 11/24/2019 1.00 PROD2 DRILL TRIP P POOH from 2,001' MD to 557' MD w/ 2,001.0 557.0 18:00 19:00 4" DP racked back in the derrick. Monitored displacement on trip tank. 11/24/2019 11/24/2019 0.50 PROD2 DRILL OWFF P OWFF (Static). 557.0 557.0 19:00 19:30 11/24/2019 11/24/2019 1.50 PROD2 DRILL BHAH P L/DBHA #8. 557.0 0.0 19:30 21:00 11/24/2019 11/24/2019 0.50 PROD2 DRILL BHAH P Clean and clear rig floor. 0.0 0.0 21:00 21:30 11/24/2019 11/24/2019 0.50 PROD2 DRILL SFTY P PJSM for slip and cut. 0.0 0.0 21:30 22:00 11/24/2019 11/25/2019 2.00 PROD2 DRILL SLPC P Slip and cut 1,995' of drill line (New 0.0 0.0 22:00 00:00 Spool). 11/25/2019 11/25/2019 1.00 PROD2 DRILL SLPC P Slipped and cut drill line. 0.0 0.0 00:00 01:00 11/25/2019 11/25/2019 0.50 PROD2 DRILL SVRG P Serviced top drive, blocks, crown, and 0.0 0.0 01:00 01:30 calibrated blocks. SIMOPS: P/U BHA components to rig floor. 11/25/2019 11/25/2019 0.50 PROD2 DRILL BHAH P P/U BHA to rig floor. 0.0 0.0 01:30 02:00 11/25/2019 11/25/2019 2.00 PROD2 DRILL BHAH P M/U RSS BHA#9 from surface to 337' 0.0 337.0 02:00 04:00 MD. 11/25/2019 11/25/2019 2.00 PROD2 DRILL TRIP P TIH from 337' MD to 2,213' MD w/ 4" 337.0 2,213.0 04:00 06:00 DP from derrick. Monitored displacement on pit #4. P/U Wt = 76 klbs, and S/O Wt = 82 klbs. 11/25/2019 11/25/2019 6.00 PROD2 DRILL TRIP P TIH from 2,213' MD to 11,688' MD w/ 2,213.0 11,668.0 06:00 12:00 4" DP from derrick. Monitored displacement on pit #4. P/U Wt = 157 klbs, and S/O Wt = 117 klbs. Filled pipe every 20 stands. 11/25/2019 11/25/2019 2.50 PROD2 DRILL TRIP P TIH from 11,688' MD to 14,172' MD w/ 11,668.0 14,172.0 12:00 14:30 4" DP from derrick. Monitored displacement on pit #4. P/U Wt = 173 klbs, and S/O Wt = 121 klbs. Filled pipe every 20 stands. 11/25/2019 11/25/2019 0.75 PROD2 DRILL DLOG P Washed down and logged R/Atag 14,172.0 14,267.0 14:30 15:15 from 14,172' MD to 14,267' MD. GPM = 240 gpm, and SPP = 1,779 psi. R/A tag observed at 14,180' MD. 11/25/2019 11/25/2019 0.75 PROD2 DRILL MPDA P PJSM. Removed trip nipple and 14,267.0 14,267.0 15:15 16:00 installed RCD bearing. 11/25/2019 11/25/2019 1.00 PROD2 DRILL TRIP P TIH from 14,267' MD to 14,450' MD w/ 14,267.0 14,450.0 16:00 17:00 4" DP from derrick. Monitored displacement on pit #4. P/U Wt = 178 klbs, and S/O Wt = 120 klbs. 11/25/2019 11/25/2019 1.00 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 14,450.0 14,512.0 17:00 18:00 14,450' MD to 14,512' MD (7,633' TVD), WOB = 15 klbs, GPM = 255 gpm, SPP on = 1,933 psi, Rotary = 100 rpm, TQ on = 10 kftlbs, F/O = 6%, ECD = 9.91 ppg, P/U Wt = 178 klbs, S/O Wt = 120 klbs, and Rot Wt = 146 klbs. MPD connection back pressure = 0 psi. ADT = 0.59 hrs, and Jar Time = 4.27 hrs. Page 44/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 . O.A. Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/25/2019 11/26/2019 6.00 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 14,512.0 15,091.0 18:00 00:00 14,512' MD to 15,091' MD (7,631' TVD), WOB = 15 klbs, GPM = 260 gpm, SPP on = 2,112 psi, Rotary = 100 rpm, TQ on = 10 kftlbs, F/O = 6%, ECD = 10.09 ppg, P/U Wt = 165 klbs, S/O Wt = 108 klbs, and Rot Wt = 150 klbs. MPD connection back pressure = 0 psi. ADT = 4.46 hrs, and Jar Time = 8.14 hrs. 11/26/2019 11/26/2019 6.00 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 15,091.0 15,690.0 00:00 06:00 15,091' MD to 15,690' MD (7,624' TVD), WOB = 14 klbs, GPM = 259 gpm, SPP on = 2,296 psi, Rotary = 80 rpm, TQ on = 10-12 kftlbs, F/O = 12%, ECD = 10.31 ppg, P/U Wt = 170 klbs, S/O Wt = 114 klbs, and Rot Wt = 146 klbs. ADT = 4.03 hrs, Bit Hours = 8.49 and Jar Time = 12.17 hrs. MPD connection back pressure = 0 psi. Pumped Anti -Jamming sweep. 11/26/2019 11/26/2019 6.00 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 15,690.0 16,408.0 06:00 12:00 15,690' MD to 16,408' MD (7,629' TVD), WOB = 15 klbs, GPM = 260 gpm, SPP on = 2,352 psi, Rotary = 80 rpm, TQ on = 10-11 kftlbs, F/O = 14%, ECD = 10.29 ppg, P/U Wt = 175 klbs, S/O Wt = 114 klbs, and Rot Wt = 142 klbs. ADT = 4.34 hrs, Bit Hours = 12.83 and Jar Time = 16.59 hrs. MPD connection back pressure = 0 psi. Pumped Anti -Jamming sweep. 11/26/2019 11/26/2019 6.00 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 16,408.0 17,155.0 12:00 18:00 16,408' MD to 17,155' MD (7,630' TVD), WOB = 19 klbs, GPM = 270 gpm, SPP on = 2,595 psi, Rotary = 90 rpm, TQ on = 12 kftlbs, F/O = 14%, ECD = 10.38 ppg, P/U Wt = 175 klbs, S/O Wt = 112 klbs, and Rot Wt = 144 klbs. ADT = 3.98 hrs, Bit Hours = 16.81 and Jar Time = 20.49 hrs. MPD connection back pressure = 0 psi. Pumped Anti -Jamming sweep. 11/26/2019 11/27/2019 6.00 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 17,155.0 17,635.0 18:00 00:00 17,155' MD to 17,635' MD (7,632' TVD), WOB = 11 klbs, GPM = 270 gpm, SPP on = 2,630 psi, Rotary = 90 rpm, TQ on = 11 kftlbs, TQ off= 7 kftlbs, F/O = 13%, ECD = 10.3 ppg, P/U Wt = 170 klbs, S/O Wt = 111 klbs, and Rot Wt = 145 klbs. ADT = 2.71 hrs, Bit Hours = 19.52 and Jar Time = 23.2 hrs. MPD connection back pressure = 0 psi. Pumped Anti - Jamming sweep. 11/27/2019 11/27/2019 3.50 PROD2 DRILL DDRL P Drilled 6 1/2" production hole from 17,635.0 17,932.0 00:00 03:30 17,635' MD to 17,932' MD (7,634' TVD), WOB = 18 klbs, GPM = 270 gpm, SPP on = 2,650 psi, Rotary = 80 rpm, TQ on = 10-12 kftlbs, TQ off= 8 kftlbs, F/O = 14%, ECD = 10.25 ppg, P/U Wt = 175 klbs, S/O Wt = 109 klbs, and Rot Wt = 146 klbs. ADT = 3.2 hrs, Bit Hours = 23.36 and Jar Time = 27.04 hrs. MPD connection back pressure = 0 psi. Page 45151 Report Printed: 12/31/2019 -` Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/27/2019 11/27/2019 1.50 PROD2 CASING CIRC P Obtained survey. Circulated, rotated 17,932.0 17,930.0 03:30 05:00 and reciprocated pipe from 17,930' MD to 17,870' MD w/ GPM = 270 gpm, SPP = 2,630 psi, F/O = 13%, ROM 70 rpm, TQ = 8 kftlbs, and ECD = 10.21 ppg, P/U Wt = 175 klbs, S/O Wt = 109 klbs, and Rot Wt = 146 klbs. 11/27/2019 11/27/2019 0.50 PROD2 CASING OWFF P Fingerprinting (Static). 17,930.0 17,930.0 05:00 05:30 11/27/2019 11/27/2019 4.50 PROD2 CASING CIRC P CBU while racking back stands after 17,930.0 17,582.0 05:30 10:00 each bottoms up from 17,930' MD to 17,582' MD w/ GPM = 270 gpm, SPP = 2,630 psi, F/O = 13%, ROM 70 rpm, TQ = 8 kftlbs, and ECD = 10.23 ppg, P/U Wt = 181 klbs, S/O Wt = 108 klbs, and Rot Wt = 142 klbs. 11/27/2019 11/27/2019 2.00 PROD2 CASING DISP P PJSM. Displaced well at 17,582' MD 17,582.0 17,582.0 10:00 12:00 to 9.5 ppg KW Brine. Rotated and reciprocated 90'w/ GPM = 268 gpm, ICP = 2,449 psi, FCP = 1,994 psi, Rotary = 60 rpm, and TQ = 7.5 kftlbs. P/U Wt = 184 klbs, S/O Wt = 110 klbs, and Rot Wt = 140 klbs. 11/27/2019 11/27/2019 0.50 PROD2 CASING OWFF P OWFF (Static). 17,582.0 17,582.0 12:00 12:30 11/27/2019 11/27/2019 3.50 PROD2 CASING SMPD P SOOH f/ 17,582' MD to 14,207' MD w/ 17,582.0 14,207.0 12:30 16:00 4" DP L/D doubles in the pipe shed. P/U Wt = 183 klbs, S/O Wt = 119 klbs, In Slips = 50 psi, Out of Slips = 80 psi. Monitored displacement on pit #4. 11/27/2019 11/27/2019 0.50 PROD2 CASING MPDA P PJSM. OWFF. Pulled RCD bearing 14,207.0 14,207.0 16:00 16:30 and installed trip nipple. 11/27/2019 11/27/2019 1.50 PROD2 CASING PULD P PJSM. POOH f/ 14,207' MD to 13,090' 14,207.0 13,090.0 16:30 18:00 MD w/ 4" DP L/D doubles in the pipe shed. P/U Wt = 179 klbs, and S/O Wt = 11 klbs, Monitored displacement on pit #4. 11/27/2019 11/27/2019 4.00 PROD2 CASING PULD P PJSM. POOH f/ 13,090' MD to 9,751' 13,090.0 9,751.0 18:00 22:00 MD w/ 4" DP L/D doubles in the pipe shed. P/U Wt = 150 klbs, and S/O Wt = 115 klbs, Monitored displacement on pit #4. 11/27/2019 11/28/2019 2.00 PROD2 CASING PULD P PJSM. POOH f/ 9,751' MD to 8,592' 9,751.0 8,592.0 22:00 00:00 MD w/ 4" DP L/D singles in the pipe shed. P/U Wt = 135 klbs, and S/O Wt = 105 klbs, Monitored displacement on pit #4. 11/28/2019 11/28/2019 6.00 PROD2 CASING PULD P POOH f/ 8,592' MD to 3,996' MD w/ 8,592.0 3,996.0 00:00 06:00 4" DP L/D singles in the pipe shed. P/U Wt = 87 klbs, and S/O Wt = 83 klbs, Monitored displacement on pit #4. 11/28/2019 11/28/2019 3.50 PROD2 CASING PULD P POOH f/ 3,996' MD to 430' MD w/ 4" 3,996.0 430.0 06:00 09:30 DP L/D singles in the pipe shed. P/U Wt = 48 klbs, and S/O Wt = 55 klbs, Monitored displacement on pit #4. 11/28/2019 11/28/2019 0.25 PROD2 CASING OWFF P OWFF (Static). 430.0 430.0 09:30 09:45 11/28/2019 11/28/2019 1.75 PROD2 CASING BHAH P PJSM. L/D BHA#9. from 430' MD to 430.0 0.0 09:45 11:30 surface. Monitored displacement on pit #4. 11/28/2019 11/28/2019 1.00 PROD2 CASING BHAH P Cleaned and cleared rig floor. 0.0 0.0 11:30 12:30 Page 46/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/28/2019 11/2 1.50 COMPZ2 FISH BHAHP PJSM. P/U Whipstock retrieval BHA 0.0 127.0 12:30 14: #10 from surface to 127' MD. P/U Wt JTimeDur = 48 klbs, and S/O Wt = 50 klbs, Monitored displacement on pit #4. 11/28/2019 11/2 1.00 COMPZ2 FISH TRIP P TIH from 127'MDto2,491'MDw/4" 127.0 2,491.0 14:00 15: DP from the derrick. P/U Wt = 66 klbs, and S/O Wt = 69 klbs, Monitored displacement on pit #4. 11/28/2019 11/28/2019 0.50 COMPZ2 FISH SVRG P Lubricate rig. 2,491.0 2,491.0 15:00 15:30 11/28/2019 11/28/2019 2.50 COMPZ2 FISH TRIP P TIH from 2,491' MD to 6,277' MD w/ 4" 2,491.0 6,277.0 15:30 18:00 DP from the derrick. P/U Wt = 101 klbs, and S/O Wt = 92 klbs, Monitored displacement on pit #4. 11/28/2019 11/29/2019 6.00 COMPZ2 FISH TRIP P TIH from 6,277' MD to 14,292' MD w/ 6,277.0 14,292.0 18:00 00:00 4" DP from the derrick. P/U Wt = 180 klbs, and S/O Wt = 128 klbs, Monitored displacement on pit #4. Logged R/Atag at 14,178' MD. 11/29/2019 11/29/2019 1.50 COMPZ2 FISH WPST P Oriented 135 degrees Left GTF. 14,292.0 14,286.0 00:00 01:30 Washed slot 5 X. Oriented 45 degrees right GTF. Set 10 klbs down weight @ 14,374' MD. P/U to 225 klbs, 40 k over (bleed of jars). P/U 255 klbs to release anchor. Racked back one stand of DP at 14,286' MD. 11/29/2019 11/29/2019 1.50 COMPZ2 FISH CIRC P CBU at 14,286' MD w/ 255 gpm, SPP 14,286.0 14,286.0 01:30 03:00 1,320 psi, and F/O = 13%. Total strokes pumped 4,921. 11/29/2019 11/29/2019 0.50 COMPZ2 FISH OWFF P OWFF (Static). 14,286.0 14,286.0 03:00 03:30 11/29/2019 11/29/2019 2.50 COMPZ2 FISH TRIP P POOH from 14,286' MD to 7,550' MD 14,286.0 7,550.0 03:30 06:00 w/ 4" DP racked back in the derrick. P/U 143 klbs. Monitored displacement on pit #4. 11/29/2019 11/29/2019 5.00 COMPZ2 FISH TRIP P POOH from 7,550' MD to 352' MD w/ 7,550.0 352.0 06:00 11:00 4" DP racked back in the derrick. Monitored displacement on pit #4. 11/29/2019 11/29/2019 2.50 COMPZ2 FISH BHAH P PJSM. L/D Whipstock and 352.0 0.0 11:00 13:30 Whipstock/retrieval BHA#10. 11/29/2019 11/29/2019 0.50 COMPZ2 FISH BHAH P Cleaned and cleared rig floor. 0.0 0.0 13:30 14:00 11/29/2019 11/29/2019 0.75 COMPZ2 CLNOUT BHAH P M/U Clean Out BHA #11. 0.0 82.0 14:00 14:45 11/29/2019 11/29/2019 3.25 COMPZ2 CLNOUT TRIP P RIH w/ BHA#11 from 82' MD to 5,008' 82.0 5,008.0 14:45 18:00 MD w/ 4" DR P/U Wt = 90 klbs, S/O Wt = 88, klbs. Monitored displacement on pit #4. Filled every 20 stands. 11/29/2019 11/30/2019 6.00 COMPZ2 CLNOUT TRIP P RIH w/ BHA#11 from 5,008' MD to 5,008.0 13,556.0 18:00 00:00 13,556' MD w/ 4" DR P/U Wt = 178 klbs, S/O Wt = 128, klbs. Monitored displacement on pit #4. Filled every 20 stands. 11/30/2019 11/30/2019 0.50 COMPZ2 CLNOUT TRIP P RIH w/ BHA#11 from 13,556' MD to 13,556.0 14,337.0 00:00 00:30 14,337' MD w/ 4" DR P/U Wt = 180 klbs, S/O Wt = 129, klbs. Monitored displacement on pit #4. Filled every 20 stands. 11/30/2019 11/30/2019 0.50 COMPZ2 CLNOUT TRIP P Worked clean out assembly w/ mill by 14,337.0 14,383.0 00:30 01:00 window at 14,369' MD to 14383' MD. (Good) Page 47/51 Report Printed: 12/31/2019 - Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 11/30/2019 11/30/2019 0.50 COMPZ2 CLNOUT TRIP P RIH to 14,602' MD. Stung into TOL w/ 14,383.0 14,602.0 01:00 01:30 GPM = 125 gpm, and SPP = 300 psi. No pressure increase was observed. P/U to 14,580' MD. Increased GPM = 210 gpm, and SPP = 680 psi (X2). Observed the TOL at 14,590' MD. 11/30/2019 11/30/2019 1.00 COMPZ2 CLNOUT CIRC P CBU at 14,588' MD w/ GPM = 251 14,602.0 14,588.0 01:30 02:30 gpm, SPP = 880 psi, F/O = 13%. Total Stokes pumped = 6,129. 11/30/2019 11/30/2019 2.50 COMPZ2 CLNOUT DISP P Displaced well to 9.5 ppg clear brine 14,588.0 14,588.0 02:30 05:00 at 14,588' MD w/ GPM = 210 - 251 gpm, SPP = 880-1,100 psi, F/O = 13%. Total Stokes pumped = 8,515. 11/30/2019 11/30/2019 2.00 COMPZ2 CLNOUT CRIH P Pumped Corrosion Inhibited brine 14,588.0 14,588.0 05:00 07:00 directtly from truck at 14,588' MD w/ GPM = 210 - 251 gpm, SPP = 880- 1,100 psi, F/O = 13%. Total Stokes pumped = 5,150. 11/30/2019 11/30/2019 0.50 COMPZ2 CLNOUT OWFF P OWFF (Static). 14,588.0 14,588.0 07:00 07:30 11/30/2019 11/30/2019 4.50 COMPZ2 CLNOUT PULD P POOH w/ clean out BHA whilst L/D 4" 14,588.0 12,500.0 07:30 12:00 DP singles from 14,588' MD to 12,500' MD. P/U Wt= 160 klbs, S/O Wt = 125 klbs. Monitored hole fill on pit #2. 11/30/2019 11/30/2019 6.00 COMPZ2 CLNOUT PULD P POOH w/ clean out BHA whilst L/D 4" 12,500.0 8,800.0 12:00 18:00 DP singles from 12,500' MD to 8,800' MD. P/U Wt= 120 klbs, S/O Wt = 109 klbs. Monitored hole fill on pit #2. 11/30/2019 12/1/2019 6.00 COMPZ2 CLNOUT PULD P POOH w/ clean out BHA whilst L/D 4" 8,800.0 4,200.0 18:00 00:00 DP singles from 8,800' MD to 4,200' MD. P/U Wt= 80 klbs, S/O Wt = 80 klbs. Monitored hole fill on pit #2. 12/1/2019 12/1/2019 5.00 COMPZ2 CLNOUT PULD P POOH while L/D 4" DP from 4,200' 4,200.0 0.0 00:00 05:00 MD to surface. Monitored hole fill on pit #2. 12/1/2019 12/1/2019 1.50 COMPZ2 CLNOUT BHAH P L/D Clean Out BHA #11. 0.0 0.0 05:00 06:30 12/1/2019 12/1/2019 0.50 COMPZ2 CLNOUT BHAH P Cleaned and cleared rig floor. 0.0 0.0 06:30 07:00 12/1/2019 12/1/2019 1.50 COMPZ2 CLNOUT SLPC P Slipped and cut 135' of drill line (17 0.0 0.0 07:00 08:30 wraps) and calibrated blocks. 12/1/2019 12/1/2019 0.50 COMPZ2 CLNOUT OTHR P Pulled wear ring. 0.0 0.0 08:30 09:00 12/1/2019 12/1/2019 1.00 COMPZ2 CLNOUT WWWH P L/D Single DP and magnets. Flushed 0.0 0.0 09:00 10:00 BOP stack. Rotary = 50 rpm, GPM = 675 GPM, SPP = 256 psi, and F/O = 33%. 12/1/2019 12/1/2019 1.00 COMPZ2 CLNOUT BHAH P L/D Magnet and Double of 4" DP. 0.0 0.0 10:00 11:00 12/1/2019 12/1/2019 1.00 COMPZ2 WHDBOP RURD P Set test plug and rigged up to test 0.0 0.0 11:00 12:00 BOPS. Rigged up to pump down the IA w/ injection line to keep hole full. 12/1/2019 12/1/2019 0.50 COMPZ2 WHDBOP BOPE P Performed shell test and fill hole down 0.0 0.0 12:00 12:30 IA. 3 bbls to fill. Page 48/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/1/2019 12/1/2019 4.00 COMPZ2 WHDBOP BOPE P Tested BOPE's. All tests 250psi 0.0 0.0 12:30 16:30 low/3500psi high for 5 charted minutes with exception of manual operated and super chokes which were tested to 250/2000psi for 5 charted minutes. Used 3 1/2" and 4 1/2" test jts,to test the annular, 2 7/8 x 5 1/2 UPR, and 27/8 x 5 1/2 LPR. Tested choke valves 1-15, manual operated and super chokes, choke and kill manuals and HCR's, 4" valve on kill line, Blind/Shear Rams, 4" FOSV, 4" dart valve, upper and lower IBOP. Perform Koomey drawdown, Accumulator = 3000 psi, Manifold =1500 psi, Accumulator =1600 psi after all functions on just bottles. 15 secs to 200 psi build with 2 electric pumps, 85 secs to build to full system pressure with 2 electric and 2 air pumps. N2 x 6 bottles Ave = 1860 psi. Closing times, annular=24 secs, UPR=21 secs, blind/shears=17 secs, LPR=16 sec, Choke HCR=2 sec, kill HCR=2sec. Tested PVT gain/loss and flow alarms. Tested LEL and 1-12S alarms. AOGCC Rep Austin McLeod waived witness on 11/29/2019 at 17:50 hr. 12/1/2019 12/1/2019 0.50 COMPZ2 WHDBOP RURD P R/D and blowed down test equipment. 0.0 0.0 16:30 17:00 Cleaned and cleared rig floor. Pull test plug. 12/1/2019 12/1/2019 2.50 COMPZ2 RPCOMP RURD P Brought up tools to the rig floor and 0.0 0.0 17:00 19:30 rigged up to run upper completions. 12/1/2019 12/1/2019 2.50 COMPZ2 RPCOMP PUTB P PJSM. RIH w/ 3 1/2" x 4 1/2" Upper 0.0 594.0 19:30 22:00 completions as per detail from 0 to 594' MD. 12/1/2019 12/1/2019 0.50 COMPZ2 RPCOMP PUTB P Changed handling equipment. M/U I- 594.0 594.0 22:00 22:30 Wire to SLB Gauge Mandrel. 12/1/2019 12/2/2019 1.50 COMPZ2 RPCOMP PUTB P Continued RIH w/4 1/2" Upper 594.0 1,788.0 22:30 00:00 completions as per detail from 594' MD to 1,788' MD. P/U Wt = 58 klbs, and S/O St = 66 klbs. 12/2/2019 12/2/2019 6.00 COMPZ2 RPCOMP PUTB P Continued RIH w/ 4 1/2" Upper 1,788.0 6,780.0 00:00 06:00 completions as per detail from 1,788' MD to 6,780' MD. P/U Wt = 92 klbs, and S/O St = 91 klbs. Monitored displacement on Pit #3. 12/2/2019 12/2/2019 6.00 COMPZ2 RPCOMP PUTB P Continued RIH w/4 1/2" Upper 6,780.0 11,350.0 06:00 12:00 completions as per detail from 6,780' MD to 11,350' MD. S/O St = 108 klbs. Monitored displacement on Pit #3. 12/2/2019 12/2/2019 4.25 COMPZ2 RPCOMP PUTB P Continued RIH w/ 4 1/2" Upper 11,350.0 14,583.0 12:00 16:15 completions as per detail from 11,350' MD to 14,583' MD. P/U Wt = 146 klbs, and S/O St = 113 klbs. Monitored displacement on Pit #3. 12/2/2019 12/2/2019 1.25 COMPZ2 RPCOMP HOSO T RIH and attempted to locate TOL. 14,583.0 14,593.0 16:15 17:30 Tagged up at 14,593' MD w/ 15 klbs down weight. No indication of shear was observed. Put in 3/4 turn and worked pipe. Attempted to locate on the down stroke. P/U Wt = 146 klbs, and S/O Wt = 113 klbs. Page 49/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/2/2019 12/2/2019 0.50 C iMPZ2 RPCOMP HOSO T L/D joint #346 and P/U 9' pup joint. 14,593.0 14,593.0 17:30 18:00 R/U to pump down tubing w/ top drive. Established circualtion at 2 bpm, SPP = 90 psi. Total strokes pumped = 86. Re -attempted to locate w/ pumps on and one full turn. 12/2/2019 12/2/2019 1.00 COMPZ2 RPCOMP HOSO T Worked completions and sting into the 14,593.0 14,593.0 18:00 19:00 TOL .f/ 14,520' MD to 14,593' MD four times to no avail. GPM 168 gpm, and SPP = 158 psi. Total strokes purred = 84. Attempted to sting in liner top (Unsuccessful). Rotated string and applied a half a turn. Worked the completions down into the liner top and set 14 klbs down weight. Pins sheared at 14,613' MD. Fully located on Joint 346 @ 14,614' MD. 12/2/2019 12/2/2019 1.00 COMPZ2 RPCOMP CIRC P L/D joint #346. B/D top drive. Pumped 14,593.0 14,555.0 19:00 20:00 30 bbls of 10 ppg clear brine. SPP = 158 psi and Total Strokes = 282. 12/2/2019 12/2/2019 1.00 COMPZ2 RPCOMP HOSO P L/D joints 344-346 and 9' pup. M/U 14,555.0 14,560.0 20:00 21:00 spaceout pups as follows: 5.82' 5.83', 3.77', 3.78', Joint #344, hanger, and landing joint. 12/2/2019 12/2/2019 1.00 COMPZ2 RPCOMP THGR P Terminated I -Wire and tested to 5,000 14,560.0 14,560.0 21:00 22:00 psi/5 minutes. P/U Wt = 143 klbs, and S/O Wt = 103 klbs. 12/2/2019 12/3/2019 2.00 COMPZ2 RPCOMP THGR T Worked 4 1/2" completions string from 14,560.0 14,593.0 22:00 00:00 14,505' MD to 14,593' MD a total of 25 times to no avail. M/U crossover to top drive and rotated one full turn to try and sting into top of liner. Located liner top. 12/3/2019 12/3/2019 1.50 COMPZ2 RPCOMP THGR P Land Hanger and RILDS. R/U test 14,593.0 14,593.0 00:00 01:30 hanger seals to 3,000 psi for 30 minutes (Charted). Monitored IA while testing (No flow). 12/3/2019 12/3/2019 1.00 COMPZ2 RPCOMP RURD P Cleaned and cleared rig floor. Blowed 14,593.0 0.0 01:30 02:30 down surface lines. L/D landing joint. 12/3/2019 12/3/2019 3.50 COMPZ2 WHDBOP NUND P Sucked out stack. Removed hole fill, 0.0 0.0 02:30 06:00 trip nipple, shrue hole & mouse hole, R/D choke & kill lines, broke bols on the stack and riser, P/U BOPs, and skidded out of the way. Picked up BOP riser and staged in BOP deck. SIMOPS: P/U frac tree to rig floor. 12/3/2019 12/3/2019 1.75 COMPZ2 WHDBOP NUND P Terminated and tested I -Wire. 0.0 0.0 06:00 07:45 12/3/2019 12/3/2019 0.25 COMPZ2 WHDBOP NUND P Prepped wellhead for adaptor flange 0.0 0.0 07:45 08:00 and frac tree. 12/3/2019 12/3/2019 3.00 COMPZ2 WHDBOP NUND P Reassembled and oriented FMC 10k 0.0 0.0 08:00 11:00 frac tree/adaptor. SIMOPS: C/O saver sub on top drive. 12/3/2019 12/3/2019 0.50 COMPZ2 WHDBOP PRTS P Test adaptor flange SBM seals to 0.0 0.0 11:00 11:30 5,000 psi for 5 minutes. 12/3/2019 12/3/2019 0.50 COMPZ2 WHDBOP OTHR P Filled tree w/ diesel and function 0.0 0.0 11:30 12:00 valves to purge. R/U to test. 12/3/2019 12/3/2019 2.00 COMPZ2 WHDBOP FRZP P R/U lines for freeze protect. Heat and 0.0 0.0 12:00 14:00 ship diesel to ball mill for freeze protect. 12/3/2019 12/3/2019 1.75 COMPZ2 WHDBOP PRTS P Pressure tested tree from 250 psi 0.0 0.0 14:00 15:45 low/10,000 psi high, CPAI witnessed. Bled off and checked IA (On Vaccum). Page 50/51 Report Printed: 12/31/2019 Operations Summary (with Timelog Depths) )_ CD5-26 Rig: HES Frac Equipment Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth (ftKB) 12/3/2019 12/3/2019 0.50 COMPZ2 WHDBOP PRTS P Rigged down test equipment. 0.0 0.0 15:45 16:15 12/3/2019 12/3/2019 0.75 COMPZ2 WHDBOP MPSP P Pulled test dart and HP-BPV. 0.0 0.0 16:15 17:00 12/3/2019 12/3/2019 1.00 COMPZ2 WHDBOP PRTS P M/U hoses and hardlines to tree and 0.0 0.0 17:00 18:00 tested to 2,250 psi. 12/3/2019 12/3/2019 1.00 COMPZ2 WHDBOP FRZP P Pumped 73 bbls diesel freeze protect 0.0 0.0 18:00 19:00 down IA (Charted). 12/3/2019 12/3/2019 1.00 COMPZ2 WHDBOP FRZP P IA pressure before U -tubing equalized 0.0 0.0 19:00 20:00 was 450 psi. Upon equalization the pressures read 220 psi. SIMOPS: R/U bridle lines and prepped derrick for scope. 12/3/2019 12/3/2019 0.50 COMPZ2 WHDBOP FRZP P Blowed down and rigged down freeze 0.0 0.0 20:00 20:30 protect lines in the cellar. 12/3/2019 12/4/2019 3.50 COMPZ2 WHDBOP SEQP T R/U lubricator and tested to 2,000 psi 0.0 0.0 20:30 00:00 (Good). Ran in w/ H-BPV via lubricator and resistance was felt while lowering into the tree. Shut in master valve and attempted to free BPV w/ no success. No upwared/downward movement was achieved once the H-BPV was stuck in the tree. Continued trying to extract the H-BPV and lubricator. 12/4/2019 12/4/2019 5.00 COMPZ2 WHDBOP WAIT T Sent FMC rep for bedrest while 0.0 0.0 00:00 05:00 evaluating lubricator issue. Monitor IA and tubing pressures every half hour, slowly dropped to 0/0 psi. SIMOPS- Complete rig work orders, change out worn valves in pit complex. 12/4/2019 12/4/2019 1.00 COMPZ2 WHDBOP WAIT T Continue waiting for FMC rep. Fully 0.0 0.0 05:00 06:00 opened master valve, pulled lubricator and inspected BPV, re -installed lubricator. SIMOPS- Lower cattle chute, R/U bridle lines on top drive. 12/4/2019 12/4/2019 0.50 COMPZ2 WHDBOP WAIT T Continue waiting for FMC rep. 0.0 0.0 06:00 06:30 Continue R/U bridle lines on top drive and set in sheaves. Continue changing out valves in pit module, work on welding projects in pit module. 12/4/2019 12/4/2019 2.00 COMPZ2 WHDBOP WAIT T Continue waiting for FMC rep. 0.0 0.0 06:30 08:30 SIMOPS- Blow down water and steam n pits. 12/4/2019 12/4/2019 1.00 COMPZ2 WHDBOP MPSP P Pull lubricator and BPV, inspect and re 0.0 0.0 08:30 09:30 -install. FMC set Type H BPV with lubricator. 12/4/2019 12/4/2019 0.50 DEMOB MOVE RURD P Secure well, install gauges, wipe 0.0 0.0 09:30 10:00 down. Install valve handles. Clean cellar box. 12/4/2019 12/4/2019 1.25 DEMOB MOVE RURD P Scope derrick down and pin to derrick. 0.0 0.0 10:00 11:15 Secure energy track. 12/4/2019 12/4/2019 0.75 DEMOB MOVE RURD P Un -Spool line off drum, secure derrick 0.0 0.0 11:15 12:00 to lay over. SIMOPS- Unplugging complexes, begin pulling Ball Mill away. Rig Release @ 12:00 hrs 12/4/19 Page 51/51 Report Printed: 12/31/2019 NADConversion Western North Slope CD5 Alpine West Pad CD5-26L1 CD5-261-1 ConocoPhillips Definitive Survey Report 06 December, 2019 Conoco hilli s p ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-26 Project: Western North Slope TVD Reference: CD5-26 Actual @ 73.0usft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-26 Actual @ 73.0usft (D25) Well: CD5-26 North Reference: True Wellbore: CD5-261_1 Survey Calculation Method: Minimum Curvature Design: CD5-261_1 Database: EDT 14 Alaska Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor Well CD5-26 Well Position +N/ -S +E/ -W Position Uncertainty 0.0 usft Northing: 5,965,780.64 usft Latitude: 70° 18'48.943 N 0.0 usft Easting: 349,057.94 usft Longitude: 151° 13'24.027 W 0.0 usft Wellhead Elevation: 0.0 usft Ground Level: 33.7 usft Wellbore CD5-26L1 Magnetics Model Name Sample Date Declination Dip Angle (usft) BGGM2018 11/25/2019 Tool Name Description Survey Date 15 85 F_ 2,054.8 CD5-26 Srvy 1 - SLB_NSG+Battery+SAG GYD-GC-SS Gyrodata gyro single shots 10/12/2019 11:3: Design CD5-26L1 MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correc110/12/2019 2:1C Audit Notes: 2,223.0 CD5-26 Srvy 3 - SLB _MWD-Inc_Only_Fi MWD-INC_ONLY (INC>10°) MWD -INC _ONLY -FILLER ( INC>10°) 10/15/2019 3:3f Version: 1.0 Phase: ACTUAL Tie On Depth: Vertical Section: Depth From (TVD) +N/ -S +E/ -W 14,678.8 (usft) (usft) (usft) (usft) 39.3 0.0 0.0 Field Strength (nT) 80.71 57, 359.59665207 14,276.8 Direction (I 158.32 Survey Program Date From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 74.0 2,054.8 CD5-26 Srvy 1 - SLB_NSG+Battery+SAG GYD-GC-SS Gyrodata gyro single shots 10/12/2019 11:3: 2,089.7 2,173.9 CD5-26 Srvy 2 - SLB_MWD+GMAG (CD MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correc110/12/2019 2:1C 2,223.0 2,223.0 CD5-26 Srvy 3 - SLB _MWD-Inc_Only_Fi MWD-INC_ONLY (INC>10°) MWD -INC _ONLY -FILLER ( INC>10°) 10/15/2019 3:3f 2,316.8 14,276.8 CD5-25 Srvy 4 - SLB_MWD+GMAG (CD MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correci10/15/2019 3:44 14,369.0 14,581.4 CD5-261_1 Srvy 1 - SLB _ MWD -Inc _Only_ MWD-INC_ONLY (INC>10°) MWD -INC -ONLY -FILLER ( INC>10°) 11/25/2019 9:04 14,678.8 17,932.0 CD5-261_1 Srvy 2 - SLB_MWD+GMAG (C MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correc111/25/2019 9:07 Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (1 0 (usft) (usft) (usft) (usft) (ft) (ft) (°lloo') (ft) Survey Tool Name 39.3 0.00 0.00 39.3 -33.7 0.0 0.0 5,965,780.6 349,057.9 0.0 0.00 UNDEFINED 74.0 0.13 201.33 74.0 1.0 0.0 0.0 5,965,780.6 349,057.9 0.4 0.03 GYD-GC-SS (1) 168.1 0.08 358.40 168.1 95.1 -0.1 -0.1 5,965,780.6 349,057.9 0.2 0.05 GYD-GC-SS (1) 262.4 0.03 36.71 262.4 189.4 0.0 0.0 5,965,780.7 349,057.9 0.1 -0.03 GYD-GC-SS (1) 357.3 0.18 126.88 357.3 284.4 -0.1 0.1 5,965,780.6 349,058.0 0.2 0.08 GYD-GC-SS(1) 451.7 0.00 95.13 451.7 378.7 -0.1 0.2 5,965,780.5 349,058.1 0.2 0.21 GYD-GC-SS (1) 546.2 0.32 9.03 546.2 473.2 0.1 0.3 5,965,780.7 349,058.2 0.3 -0.02 GYD-GC-SS (1) 640.7 0.24 46.97 640.7 567.7 0.5 0.4 5,965,781.1 349,058.4 0.2 -0.31 GYD-GC-SS(1) 734.5 0.34 107.95 734.4 661.5 0.6 0.8 5,965,781.2 349,058.8 0.3 -0.21 GYD-GC-SS (1) 828.5 2.13 175.79 828.5 755.5 -1.3 1.2 5,965,779.3 349,059.1 2.2 1.64 GYD-GC-SS (1) 12/6/2019 9:53:06AM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-26 Project: Western North Slope TVD Reference: CD5-26 Actual @ 73.0usft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-26 Actual @ 73.0usft (D25) Well: CD5-26 North Reference: True Wellbore: CD5-261-1 Survey Calculation Method: Minimum Curvature Design: CD5-261-1 Database: EDT 14 Alaska Production Survey 12/6/2019 9:53:06AM Page 3 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc AZI TVD TVDSS +N/ -S +E/ -W Northing Easting US Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 923.1 4.17 176.22 923.0 850.0 -6.5 1.6 5,965,774.2 349,059.4 2.2 6.59 GYD-GC-SS (1) 1,017.3 4.92 169.96 1,016.9 943.9 -13.8 2.5 5,965,766.7 349,060.2 1.0 13.80 GYD-GC-SS (1) 1,111.8 5.96 168.70 1,111.0 1,038.0 -22.7 4.2 5,965,757.9 349,061.7 1.1 22.60 GYD-GC-SS (1) 1,205.9 7.64 163.55 1,204.4 1,131.4 -33.4 6.9 5,965,747.1 349,064.2 1.9 33.63 GYD-GC-SS (1) 1,300.7 9.57 161.42 1,298.1 1,225.1 -47.0 11.2 5,965,733.5 349,068.2 2.1 47.78 GYD-GC-SS (1) 1,394.9 11.05 160.80 1,390.7 1,317.8 -62.9 16.7 5,965,717.4 349,073.3 1.6 64.61 GYD-GC-SS(1) 1,489.4 13.41 158.51 1,483.1 1,410.1 -81.6 23.7 5,965,698.5 349,080.0 2.6 84.61 GYD-GC-SS (1) 1,583.2 15.61 159.30 1,573.9 1,500.9 -103.6 32.1 5,965,676.4 349,088.0 2.4 108.12 GYD-GC-SS (1) 1,677.6 17.52 161.39 1,664.4 1,591.4 -128.9 41.2 5,965,650.9 349,096.5 2.1 135.02 GYD-GC-SS (1) 1,771.8 19.16 162.19 1,753.8 1,680.8 -157.1 50.4 5,965,622.6 349,105.2 1.8 164.58 GYD-GC-SS (1) 1,864.3 20.94 163.32 1,840.7 1,767.7 -187.4 59.8 5,965,592.1 349,113.9 2.0 196.20 GYD-GC-SS (1) 1,958.3 23.43 165.40 1,927.7 1,854.7 -221.6 69.3 5,965,557.8 349,122.8 2.8 231.49 GYD-GC-SS (1) 2,054.8 25.71 168.36 2,015:5 1,942.5 -260.6 78.4 5,965,518.5 349,131.1 2.7 271.15 GYD-GC-SS (1) 2,089.7 26.88 168.90 2,046.7 1,973.7 -275.8 81.4 5,965,503.3 349,133.8 3.4 286.34 MWD+IFR2+SAG+MS (2) 2,173.9 28.32 169.51 2,121.4 2,048.4 -314.1 88.7 5,965,464.8 349,140.3 1.7 324.66 MWD+IFR2+SAG+MS (2) 2,223.0 29.20 169.51 2,164.4 2,091.4 -337.3 93.0 5,965,441.5 349,144.2 1.8 347.84 MWD-INC_ONLY(INC>10°)(3) I 2,316.8 29.99 167.81 2,246.0 2,173.0 -382.7 102.1 5,965,395.9 349,152.4 1.2 393.41 MWD+IFR2+SAG+MS (4) 2,409.3 31.28 165.11 2,325.5 2,252.6 -428.5 113.2 5,965,349.9 349,162.5 2.0 440.05 MWD+IFR2+SAG+MS (4) 2,504.6 35.53 162.13 2,405.2 2,332.2 -478.9 128.1 5,965,299.3 349,176.3 4.8 492.32 MWD+IFR2+SAG+MS (4) 2,597.3 39.21 160.92 2,478.8 2,405.8 -532.2 145.9 5,965,245.7 349,193.1 4.1 548.45 MWD+IFR2+SAG+MS (4) 2,691.3 42.79 160.18 2,549.7 2,476.7 -590.3 166.5 5,965,187.1 349,212.5 3.8 610.05 MWD+IFR2+SAG+MS (4) 2,784.9 46.47 161.05 2,616.3 2,543.4 -652.4 188.3 5,965,124.6 349,233.0 4.0 675.79 MWD+IFR2+SAG+MS (4) 2,879.7 50.03 162.54 2,679.4 2,606.5 -719.5 210.3 5,965,057.1 349,253.7 3.9 746.34 MWD+IFR2+SAG+MS (4) 2,975.1 52.05 162.30 2,739.4 2,666.4 -790.2 232.7 5,964,986.0 349,274.7 2.1 820.29 MWD+IFR2+SAG+MS (4) 3,068.0 53.86 161.93 2,795.4 2,722.4 -860.8 255.5 5,964,914.9 349,296.1 2.0 894.33 MWD+IFR2+SAG+MS (4) 3,162.3 56.05 161.58 2,849.5 2,776.5 -934.1 279.7 5,964,841.2 349,318.8 2.3 971.34 MWD+IFR2+SAG+MS (4) 3,257.6 59.48 161.47 2,900.4 2,827.4 -1,010.6 305.2 5,964,764.2 349,342.8 3.6 1,051.86 MWD+IFR2+SAG+MS (4) 3,352.5 62.28 160.19 2,946.5 2,873.6 -1,088.9 332.5 5,964,685.4 349,368.4 3.2 1,134.70 MWD+IFR2+SAG+MS (4) 3,445.8 63.95 160.80 2,988.7 2,915.8 -1,167.3 360.2 5,964,606.4 349,394.6 1.9 1,217.85 MWD+IFR2+SAG+MS (4) 3,541.1 64.41 161.21 3,030.2 2,957.2 -1,248.4 388.2 5,964,524.8 349,420.9 0.6 1,303.51 MWD+IFR2+SAG+MS (4) 3,635.2 64.37 163.21 3,070.9 2,997.9 -1,329.2 414.1 5,964,443.5 349,445.2 1.9 1,388.17 MWD+IFR2+SAG+MS (4) 3,730.1 64.38 163.65 3,111.9 3,039.0 -1,411.2 438.5 5,964,361.0 349,467.9 0.4 1,473.37 MWD+IFR2+SAG+MS (4) 3,823.4 64.37 163.52 3,152.3 3,079.3 -1,491.9 462.2 5,964,279.9 349,490.1 0.1 1,557.12 MWD+IFR2+SAG+MS (4) 3,917.6 64.44 164.13 3,193.0 3,120.0 -1,573.5 485.9 5,964,197.8 349,512.1 0.6 1,641.75 MWD+IFR2+SAG+MS (4) 4,011.3 64.20 164.07 3,233.6 3,160.6 -1,654.7 509.1 5,964,116.2 349,533.6 0.3 1,725.71 MWD+IFR2+SAG+MS (4) 4,106.2 64.37 163.85 3,274.8 3,201.8 -1,736.9 532.7 5,964,033.5 349,555.6 0.3 1,810.80 MWD+IFR2+SAG+MS (4) 4,200.0 64.31 163.81 3,315.4 3,242.4 -1,818.1 556.2 5,963,951.9 349,577.5 0.1 1,894.98 MWD+IFR2+SAG+MS (4) 4,293.3 64.11 162.93 3,356.0 3,283.0 -1,898.6 580.3 5,963,870.9 349,599.9 0.9 1,978.65 MWD+IFR2+SAG+MS (4) 4,390.0 64.22 162.03 3,398.1 3,325.1 -1,981.5 606.5 5,963,787.4 349,624.4 0.8 2,065.43 MWD+IFR2+SAG+MS (4) 4,484.3 64.25 161.25 3,439.1 3,366.1 -2,062.2 633.2 5,963,706.3 349,649.5 0.7 2,150.22 MWD+IFR2+SAG+MS (4) 12/6/2019 9:53:06AM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-26 Project: Western North Slope TVD Reference: CD5-26 Actual @ 73.0usft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-26 Actual @ 73.0usft (D25) Well: CD5-26 North Reference: True Wellbore: CD5-261-1 Survey Calculation Method: Minimum Curvature Design: CD5-261-1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 4,578.3 64.08 159.68 3,480.1 3,407.1 -2,141.9 661.5 5,963,626.0 349,676.2 1.5 2,234.81 MWD+IFR2+SAG+MS (4) 4,671.5 64.25 159.15 3,520.7 3,447.7 -2,220.5 691.0 5,963,546.9 349,704.1 0.5 2,318.68 MWD+IFR2+SAG+MS (4) 4,766.3 64.34 158.61 3,561.8 3,488.8 -2,300.1 721.8 5,963,466.7 349,733.3 0.5 2,404.04 MWD+IFR2+SAG+MS (4) 4,860.3 64.31 157.72 3,602.5 3,529.6 -2,378.8 753.3 5,963,387.4 349,763.2 0.9 2,488.78 MWD+IFR2+SAG+MS (4) 4,954.7 64.34 156.95 3,643.4 3,570.5 -2,457.3 786.1 5,963,308.3 349,794.4 0.7 2,573.84 MWD+IFR2+SAG+MS (4) 5,049.6 64.27 156.88 3,684.6 3,611.6 -2,536.0 819.6 5,963,228.9 349,826.3 0.1 2,659.36 MWD+IFR2+SAG+MS (4) 5,142.6 64.35 156.89 3,724.9 3,651.9 -2,613.0 852.5 5,963,151.2 349,857.7 0.1 2,743.12 MWD+IFR2+SAG+MS (4) 5,237.3 64.20 157.31 3,766.0 3,693.0 -2,691.6 885.7 5,963,072.0 349,889.3 0.4 2,828.40 MWD+IFR2+SAG+MS (4) 5,331.1 64.47 157.77 3,806.6 3,733.7 -2,769.7 918.0 5,962,993.2 349,920.0 0.5 2,912.95 MWD+IFR2+SAG+MS (4) 5,426.6 64.47 158.76 3,847.8 3,774.8 -2,849.8 949.9 5,962,912.5 349,950.3 0.9 2,999.14 MWD+IFR2+SAG+MS (4) 5,520.7 64.43 158.92 3,888.4 3,815.4 -2,929.0 980.6 5,962,832.7 349,979.4 0.2 3,084.06 MWD+IFR2+SAG+MS (4) 5,612.4 64.43 159.16 3,927.9 3,855.0 -3,006.2 1,010.1 5,962,755.0 350,007.4 0.2 3,166.72 MWD+IFR2+SAG+MS (4) 5,704.5 64.34 159.43 3,967.8 3,894.8 -3,083.9 1,039.5 5,962,676.7 350,035.2 0.3 3,249.82 MWD+IFR2+SAG+MS (4) 5,799.0 64.31 160.19 4,008.7 3,935.7 -3,163.8 1,068.9 5,962,596.2 350,062.9 0.7 3,334.90 MWD+IFR2+SAG+MS (4) 5,893.3 64.38 160.23 4,049.5 3,976.6 -3,243.8 1,097.7 5,962,515.7 350,090.1 0.1 3,419.87 MWD+IFR2+SAG+MS (4) 5,987.1 64.42 160.42 4,090.1 4,017.1 -3,323.5 1,126.2 5,962,435.4 350,117.0 0.2 3,504.46 MWD+IFR2+SAG+MS (4) 6,080.8 63.95 161.02 4,130.9 4,057.9 -3,403.1 1,154.0 5,962,355.3 350,143.2 0.8 3,588.67 MWD+IFR2+SAG+MS (4) 6,175.3 64.00 161.50 4,172.4 4,099.4 -3,483.5 1,181.3 5,962,274.3 350,168.9 0.5 3,673.52 MWD+IFR2+SAG+MS (4) 6,272.1 63.92 161.80 4,214.8 4,141.9 -3,566.1 1,208.7 5,962,191.3 350,194.6 0.3 3,760.33 MWD+IFR2+SAG+MS (4) 6,366.0 63.89 161.52 4,256.1 4,183.2 -3,646.1 1,235.2 5,962,110.7 350,219.5 0.3 3,844.50 MWD+IFR2+SAG+MS (4) 6,457.9 63.96 161.57 4,296.6 4,223.6 -3,724.4 1,261.4 5,962,031.9 350,244.1 0.1 3,926.96 MWD+IFR2+SAG+MS (4) 6,552.3 63.95 160.99 4,338.0 4,265.0 -3,804.7 1,288.6 5,961,951.1 350,269.7 0.6 4,011.59 MWD+IFR2+SAG+MS (4) 6,646.6 63.99 161.42 4,379.4 4,306.4 -3,885.0 1,315.9 5,961,870.3 350,295.4 0.4 4,096.27 MWD+IFR2+SAG+MS (4) 6,741.1 63.89 160.74 4,420.9 4,347.9 -3,965.2 1,343.4 5,961,789.5 350,321.2 0.7 4,181.01 MWD+IFR2+SAG+MS (4) 6,835.7 63.90 161.84 4,462.5 4,389.5 A.045.7 1,370.6 5,961,708.5 350,346.9 1.0 4,265.89 MWD+IFR2+SAG+MS (4) 6,929.1 63.80 161.24 4,503.7 4,430.7 A,125.2 1,397.2 5,961,628.4 350,371.8 0.6 4,349.60 MWD+IFR2+SAG+MS (4) 7,023.4 63.86 160.33 4,545.3 4,472.3 -4,205.1 1,425.0 5,961,548.0 350,396.1 0.9 4,434.11 MWD+IFR2+SAG+MS (4) 7,117.2 63.90 160.29 4,586.6 4,513.6 -4,284.4 1,453.4 5,961,468.2 350,424.8 0.1 4,518.30 MWD+IFR2+SAG+MS (4) 7,211.4 63.86 160.02 4,628.0 4,555.1 -4,364.0 1,482.1 5,961,388.0 350,452.0 0.3 4,602.88 MWD+IFR2+SAG+MS (4) 7,307.5 63.96 159.85 4,670.3 4,597.3 -4,445.1 1,511.7 5,961,306.4 350,479.9 0.2 4,689.12 MWD+IFR2+SAG+MS (4) 7,401.3 63.99 160.94 4,711.5 4,638.5 A,524.5 1,540.0 5,961,226.4 350,506.6 1.0 4,773.38 MWD+IFR2+SAG+MS (4) 7,494.1 64.10 160.94 4,752.1 4,679.1 -4,603.3 1,567.3 5,961,147.1 350,532.2 0.1 4,856.70 MWD+IFR2+SAG+MS (4) 7,590.3 64.05 161.33 4,794.1 4,721.2 -4,685.2 1,595.3 5,961,064.6 350,558.6 0.4 4,943.16 MWD+IFR2+SAG+MS (4) 7,684.2 63.99 161.40 4,835.3 4,762.3 -4,765.2 1,622.2 5,960,984.1 350,583.9 0.1 5,027.43 MWD+IFR2+SAG+MS (4) 7,777.6 64.07 160.74 4,876.2 4,803.2 -4,844.7 1,649.5 5,960,904.2 350,609.6 0.6 5,111.32 MWD+IFR2+SAG+MS (4) 7,871.1 64.06 159.92 4,917.0 4,844.1 A,923.8 1,677.8 5,960,824.5 350,636.3 0.8 5,195.29 MWD+IFR2+SAG+MS (4) 7,965.2 64.09 158.64 4,958.2 4,885.2 -5,002.9 1,707.7 5,960,744.8 350,664.6 1.2 5,279.90 MWD+IFR2+SAG+MS (4) 8,059.6 63.96 157.81 4,999.6 4,926.7 -5,081.9 1,739.3 5,960,665.1 350,694.6 0.8 5,364.98 MWD+IFR2+SAG+MS (4) 8,154.1 63.90 158.03 5,041.1 4,968.1 -5,160.4 1,771.1 5,960,586.0 350,724.8 0.2 5,449.71 MWD+IFR2+SAG+MS (4) 8,245.6 64.19 157.81 5,081.1 5,008.1 -5,236.6 1,802.0 5,960,509.2 350,754.2 0.4 5,531.93 MWD+IFR2+SAG+MS (4) 12/6/2019 9: 53 06A Page 4 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Repoli Company: NADConversion Local Coordinate Reference: Well CD5-26 Project: Western North Slope TVD Reference: CD5-26 Actual @ 73.0usft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-26 Actual @ 73.0usft (D25) Well: CD5-26 North Reference: True Wellbore: CD5-261-1 Survey Calculation Method: Minimum Curvature Design: CD5-261-1 Database: EDT 14 Alaska Production Survey 12/6/2019 9.53.06AM Page 5 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 8,340.2 64.09 158.30 5,122.4 5,049.4 -5,315.6 1,833.8 5,960,429.6 350,784.4 0.5 5,617.05 MWD+IFR2+SAG+MS (4) 8,434.2 63.93 159.32 5,163.6 5,090.6 -5,394.4 1,864.4 5,960,350.3 350,813.4 1.0 5,701.54 MWD+IFR2+SAG+MS (4) 8,528.5 64.00 159.18 5,205.0 5,132.0 -5,473.6 1,894.4 5,960,270.4 350,841.8 0.2 5,786.30 MWD+IFR2+SAG+MS (4) 8,622.8 64.16 159.15 5,246.2 5,173.2 -5,552.9 1,924.6 5,960,190.6 350,870.3 0.2 5,871.07 MWD+IFR2+SAG+MS (4) 8,717.7 63.96 159.86 5,287.7 5,214.7 -5,632.8 1,954.4 5,960,110.1 350,898.6 0.7 5,956.41 MWD+IFR2+SAG+MS (4) 8,811.7 64.13 159.90 5,328.9 5,255.9 -5,712.2 1,983.5 5,960,030.1 350,926.1 0.2 6,040.93 MWD+IFR2+SAG+MS (4) 8,905.7 64.02 160.40 5,369.9 5,297.0 -5,791.7 2,012.2 5,959,950.0 350,953.2 0.5 6,125.42 MWD+IFR2+SAG+MS (4) 9,000.4 64.03 160.45 5,411.4 5,338.4 -5,871.9 2,040.7 5,959,869.3 350,980.1 0.0 6210.44 MWD+IFR2+SAG+MS (4) 9,094.3 64.05 161.30 5,452.5 5,379.5 -5,951.7 2,068.4 5,959,789.0 351,006.1 0.8 6,294.77 MWD+IFR2+SAG+MS (4) 9,188.1 64.09 161.30 5,493.5 5,420.5 -6,031.6 2,095.4 5,959,708.6 351,031.6 0.0 6,379.01 MWD+IFR2+SAG+MS (4) 9,282.3 64.00 161.87 5,534.7 5,461.8 -6,111.9 2,122.2 5,959,627.7 351,056.7 0.6 6,463.58 MWD+IFR2+SAG+MS (4) 9,376.8 64.19 162.64 5,576.0 5,503.1 E, 192.9 2,148.1 5,959,546.3 351,081.0 0.8 6,548.40 MWD+IFR2+SAG+MS (4) 9,470.9 64.09 163.48 5,617.1 5,544.1 -6,273.9 2,172.8 5,959,464.8 351,104.0 0.8 6,632.76 MWD+IFR2+SAG+MS (4) 9,565.2 64.25 163.61 5,658.2 5,585.2 -6,355.3 2,196.8 5,959,382.9 351,126.4 0.2 6,717.35 MWD+IFR2+SAG+MS (4) 9,659.6 64.12 163.82 5,699.3 5,626.3 -6,436.9 2,220.7 5,959,300.8 351,148.6 0.2 6,801.97 MWD+IFR2+SAG+MS (4) 9,754.0 63.96 164.05 5,740.6 5,667.6 -6,518.5 2,244.1 5,959,218.9 351,170.4 0.3 6,886.41 MWD+IFR2+SAG+MS (4) 9,849.1 64.00 162.86 5,782.3 5,709.4 -6,600.4 2,268.5 5,959,136.5 351,193.1 1.1 6,971.53 MWD+IFR2+SAG+MS (4) 9,943.1 64.06 162.11 5,823.5 5,750.5 -6,681.0 2,293.9 5,959,055.4 351,216.9 0.7 7,055.83 MWD+IFR2+SAG+MS (4) 10,037.7 64.02 161.67 5,864.9 5,791.9 -6,761.8 2,320.4 5,958,974.0 351,241.7 0.4 7,140.72 MWD+IFR2+SAG+MS (4) 10,131.7 64.19 160.90 5,905.9 5,833.0 -6,841.9 2,347.5 5,958,893.5 351,267.2 0.8 7,225.13 MWD+IFR2+SAG+MS (4) 10,226.6 64.02 160.51 5,947.4 5,874.4 -6,922.5 2,375.7 5,958,812.3 351,293.8 0.4 7,310.43 MWD+IFR2+SAG+MS (4) 10,321.2 64.13 161.11 5,988.7 5,915.8 -7,002.8 2,403.6 5,958,731.5 351,320.2 0.6 7,395.40 MWD+IFR2+SAG+MS (4) 10,415.1 63.98 161.27 6,029.8 5,956.8 -7,082.7 2,430.9 5,958,651.0 351,345.8 0.2 7,479.73 MWD+IFR2+SAG+MS (4) 10,509.9 64.14 160.69 6,071.3 5,998.3 -7,163.3 2,458.7 5,958,569.9 351,371.9 0.6 7,564.89 MWD+IFR2+SAG+MS (4) 10,603.3 63.67 160.73 6,112.4 6,039.4 -7,242.5 2,486.4 5,958,490.2 351,398.0 0.5 7,648.73 MWD+IFR2+SAG+MS(4) 10,697.2 63.65 159.82 6,154.1 6,081.1 -7,321.7 2,514.8 5,958,410.4 351,424.8 0.9 7,732.84 MWD+IFR2+SAG+MS (4) 10,791.2 63.58 159.54 6,195.8 6,122.9 -7,400.7 2,544.0 5,958,330.8 351,452.5 0.3 7,817.03 MWD+IFR2+SAG+MS (4) 10,884.5 63.59 158.96 6,237.3 6,164.4 -7,478.9 2,573.6 5,958,252.1 351,480.5 0.6 7,900.60 MWD+IFR2+SAG+MS (4) 10,979.1 63.59 158.89 6,279.4 6,206.4 -7,557.9 2,604.1 5,958,172.5 351,509.4 0.1 7,985.29 MWD+IFR2+SAG+MS (4) 11,073.2 63.35 158.94 6,321.5 6,248.5 -7,636.5 2,634.4 5,958,093.3 351,538.1 0.3 8,069.51 MWD+IFR2+SAG+MS (4) 11,167.1 63.52 159.02 6,363.4 6,290.5 -7,714.9 2,664.5 5,958,014.4 351,566.6 0.2 8,153.47 MWD+IFR2+SAG+MS (4) 11,263.9 63.45 158.87 6,406.6 6,333.7 -7,795.6 2,695.6 5,957,933.0 351,596.1 0.2 8,240.04 MWD+IFR2+SAG+MS (4) 11,357.2 63.97 157.93 6,448.0 6,375.0 -7,873.5 2,726.4 5,957,854.5 351,625.4 1.1 8,323.76 MWD+IFR2+SAG+MS (4) 11,451.4 64.13 158.86 6,489.2 6,416.2 -7,952.2 2,757.6 5,957,775.2 351,654.9 0.9 8,408.42 MWD+IFR2+SAG+MS (4) 11,545.3 63.97 160.07 6,530.3 6,457.3 -8,031.3 2,787.2 5,957,695.6 351,682.9 1.2 8,492.82 MWD+IFR2+SAG+MS (4) 11,640.1 64.04 160.63 6,571.8 6,498.8 -8,111.5 2,815.9 5,957,614.8 351,710.0 0.5 8,577.96 MWD+IFR2+SAG+MS (4) 11,732.1 64.00 160.57 6,612.2 6,539.2 -8,189.5 2,843.4 5,957,536.2 351,735.9 0.1 8,660.66 MWD+IFR2+SAG+MS (4) 11,825.3 63.99 160.58 6,653.0 6,580.0 -8,268.5 2,871.2 5,957,456.7 351,762.1 0.0 8,744.35 MWD+IFR2+SAG+MS (4) 11,920.4 64.03 160.96 6,694.7 6,621.7 -8,349.2 2,899.4 5,957,375.4 351,788.7 0.4 8,829.72 MWD+IFR2+SAG+MS (4) 12,014.8 64.13 160.53 6,735.9 6,663.0 -8,429.4 2,927.4 5,957,294.7 351,815.0 0.4 8,914.55 MWD+IFR2+SAG+MS (4) 12/6/2019 9.53.06AM Page 5 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-26 Project: Western North Slope TVD Reference: CD5-26 Actual @ 73.Ousft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-26 Actual @ 73.Ousft (D25) Well: CD5-26 North Reference: True Wellbore: CD5-261-1 Survey Calculation Method: Minimum Curvature Design: CD5-261-1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (Usti) (usft) (usft) (usft) (ft) (ft) (°I100') (ft) Survey Tool Name 12,110.8 64.02 160.45 6,777.9 6,704.9 -8,510.8 2,956.2 5,957,212.8 351,842.2 0.1 9,000.84 MWD+IFR2+SAG+MS (4) 12,206.5 63.96 160.59 6,619.9 6,746.9 -8,591.9 2,984.9 5,957,131.2 351,869.3 0.1 9,086.78 MWD+IFR2+SAG+MS (4) 12,299.7 63.97 160.47 6,860.8 6,787.8 -8,670.8 3,012.8 5,957,051.7 351,895.6 0.1 9,170.42 MWD+IFR2+SAG+MS (4) 12,394.1 63.87 160.39 6,902.3 6,829.3 -8,750.7 3,041.2 5,956,971.2 351,922.4 0.1 9,255.18 MWD+IFR2+SAG+MS (4) 12,489.4 63.94 160.04 6,944.2 6,871.2 -8,831.3 3,070.2 5,956,890.1 351,949.7 0.3 9,340.76 MWD+IFR2+SAG+MS (4) 12,583.1 63.78 159.84 6,985.5 6,912.5 -8,910.3 3,099.0 5,956,810.5 351,977.0 0.3 9,424.85 MWD+IFR2+SAG+MS (4) 12,677.3 63.72 159.80 7,027.2 6,954.2 -8,989.6 3,128.2 5,956,730.7 352,004.5 0.1 9,509.29 MWD+IFR2+SAG+MS (4) 12,771.3 63.87 159.94 7,068.7 6,995.7 -9,068.7 3,157.2 5,956,651.0 352,031.9 0.2 9,593.56 MWD+IFR2+SAG+MS (4) 12,865.6 63.84 160.87 7,110.2 7,037.2 -9,148.5 3,185.6 5,956,570.7 352,058.7 0.9 9,678.16 MWD+IFR2+SAG+MS (4) 12,960.0 63.81 161.31 7,151.8 7,078.9 -9,228.6 3,213.0 5,956,490.0 352,084.6 0.4 9,762.76 MWD+IFR2+SAG+MS (4) 13,054.0 63.75 161.58 7,193.4 7,120.4 -9,308.6 3,239.9 5,956,409.5 352,109.8 0.3 9,847.03 MWD+IFR2+SAG+MS (4) 13,147.4 64.00 161.75 7,234.5 7,161.6 -9,388.2 3,266.3 5,956,329.4 352,134.6 0.3 9,930.75 MWD+IFR2+SAG+MS (4) 13,239.9 64.30 161.93 7,274.8 7,201.9 -9,467.2 3,292.2 5,956,249.8 352,158.9 0.4 10,013.77 MWD+IFR2+SAG+MS (4) 13,334.2 64.35 161.26 7,315.7 7,242.7 -9,547.9 3,319.0 5,956,168.6 352,184.1 0.6 10,098.65 MWD+IFR2+SAG+MS (4) 13,428.3 64.37 161.83 7,356.4 7,283.4 -9,628.4 3,345.9 5,956,087.7 352,209.3 0.5 10,183.33 MWD+IFR2+SAG+MS (4) 13,522.7 65.16 160.95 7,396.7 7,323.7 -9,709.3 3,373.1 5,956,006.2 352,235.0 1.2 10,268.60 MWD+IFR2+SAG+MS (4) 13,618.1 66.70 158.03 7,435.6 7,362.6 -9,790.9 3,403.7 5,955,924.0 352,263.8 3.2 10,355.72 MWD+IFR2+SAG+MS (4) 13,713.4 69.56 156.85 7,471.1 7,398.1 -9,872.5 3,437.6 5,955,841.7 352,296.1 3.2 10,444.10 MWD+IFR2+SAG+MS (4) 13,807.3 71.97 156.24 7,502.0 7,429.0 -9,953.8 3,472.9 5,955,759.8 352,329.8 2.6 10,532.69 MWD+IFR2+SAG+MS (4) 13,902.0 74.30 156.17 7,529.5 7,456.5 -10,036.7 3,509.4 5,955,676.1 352,364.6 2.5 10,623.23 MWD+IFR2+SAG+MS (4) 13,995.8 76.69 156.41 7,553.0 7,480.0 -10,119.9 3,545.9 5,955,592.3 352,399.5 2.6 10,713.99 MWD+IFR2+SAG+MS (4) 14,088.7 78.89 155.97 7,572.6 7,499.6 -10,203.0 3,582.6 5,955,508.5 352,434.5 2.4 10,804.74 MWD+IFR2+SAG+MS (4) 14,183.0 80.90 155.60 7,589.2 7,516.2 -10,287.7 3,620.7 5,955,423.0 352,470.8 2.2 10,897.53 MWD+IFR2+SAG+MS (4) 14,276.8 82.27 155.12 7,602.9 7,529.9 -10,372.0 3,659.4 5,955,338.0 352,507.8 1.5 10,990.14 MWD+IFR2+SAG+MS (4) 14,369.0 83.89 154.95 7,614.0 7,541.0 -10,454.9 3,698.0 5,955,254.2 352,544.8 1.8 11,081.52 MWD -INC _ONLY (INC>10°)(5) 14,384.4 84.62 155.67 7,615.5 7,542.6 -10,468.8 3,704.4 5,955,240.2 352,550.9 6.7 11,096.80 MWD-INC_ONLY (INC>10°) (5) 14,393.4 85.61 156.64 7,616.3 7,543.3 -10,477.1 3,708.0 5,955,231.9 352,554.3 15.3 11,105.83 MWD-INC_ONLY (INC>10°) (5) 14,485.4 88.94 156.54 7,620.7 7,547.7 -10,561.4 3,744.5 5,955,146.9 352,589.1 3.6 11,197.65 MWD-INC_ONLY(INC>10°)(5) 14,581.4 89.14 156.43 7,622.3 7,549.3 -10,649.4 3,782.8 5,955,058.1 352,625.7 0.2 11,293.59 MWD -INC -ONLY (INC>10°) (5) 14,678.8 89.13 156.32 7,623.8 7,550.8 -10,738.7 3,821.9 5,954,968.1 352,662.9 0.1 11,390.93 MWD+IFR2+SAG+MS (6) 14,773.8 89.84 155.28 7,624.6 7,551.6 -10,825.3 3,860.8 5,954,880.7 352,700.1 1.3 11,485.83 MWD+IFR2+SAG+MS (6) 14,869.9 89.49 152.52 7,625.2 7,552.2 -10,911.6 3,903.1 5,954,793.6 352,740.6 2.9 11,581.62 MWD+IFR2+SAG+MS (6) 14,964.8 90.91 153.87 7,624.8 7,551.9 -10,996.3 3,945.9 5,954,708.1 352,781.7 2.1 11,676.16 MWD+IFR2+SAG+MS (6) 15,059.4 90.80 152.38 7,623.4 7,550.5 -11,080.6 3,988.6 5,954,622.9 352,822.7 1.6 11,770.27 MWD+IFR2+SAG+MS (6) 15,154.2 89.90 150.18 7,622.9 7,549.9 -11,163.8 4,034.2 5,954,538.8 352,866.6 2.5 11,864.41 MWD+IFR2+SAG+MS (6) 15,250.0 88.87 151.77 7,623.9 7,550.9 -11,247.5 4,080.7 5,954,454.2 352,911.4 2.0 11,959.42 MWD+IFR2+SAG+MS (6) 15,344.9 89.69 149.46 7,625.1 7,552.1 -11,330.2 4,127.2 5,954,370.6 352,956.2 2.6 12,053.39 MWD+IFR2+SAG+MS (6) 15,440.4 90.03 149.93 7,625.3 7,552.3 -11,412.6 4,175.4 5,954,287.2 353,002.7 0.6 12,147.81 MWD+IFR2+SAG+MS (6) 15,534.5 90.59 154.13 7,624.8 7,551.8 -11,495.7 4,219.5 5,954,203.2 353,045.2 4.5 12,241.36 MWD+IFR2+SAG+MS (6) 15,627.0 90.59 153.13 7,623.8 7,550.9 -11,578.6 4,260.6 5,954,119.5 353,084.6 1.1 12,333.57 MWD+IFR2+SAG+MS (6) 12/6/2019 9:53:06AM Page 6 COMPASS 5000.14 Build 85H Company: Project: Site: Well: Wellbore: Design: Survey NADConversion Western North Slope CD5 Alpine West Pad CD5-26 CD5-261-1 CD5-261-1 ConocoPhillips Definitive Survey Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-26 CD5-26 Actual @ 73.Ousft (D25) CD5-26 Actual @ 73.Ousft (D25) True Minimum Curvature EDT 14 Alaska Production 1216/2019 9:53:06AM Page 7 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Azi TVD TVDSS +N/ -S +E/ -W Northing Easting DLS Section (usft) (°) (°) (usft) (usft) (usft) (usft) (ft) (ft) (°/100') (ft) Survey Tool Name 15,723.5 89.92 153.40 7,623.4 7,550.4 -11,664.8 4,304.0 5,954,032.6 353,126.3 0.7 12,429.61 MWD+IFR2+SAG+MS (6) 15,819.1 89.76 152.95 7,623.7 7,550.7 -11,750.1 4,347.2 5,953,946.4 353,167.7 0.5 12,524.88 MWD+IFR2+SAG+MS (6) 15,914.0 89.41 152.42 7,624.4 7,551.4 -11,834.5 4,390.7 5,953,861.2 353,209.5 0.7 12,619.34 MWD+IFR2+SAG+MS (6) 16,010.7 89.41 151.85 7,625.4 7,552.4 -11,919.9 4,435.9 5,953,774.8 353,253.0 0.6 12,715.48 MWD+IFR2+SAG+MS (6) 16,104.0 89.30 150.59 7,626.4 7,553.4 -12,001.7 4,480.8 5,953,692.2 353,296.3 1.4 12,808.02 MWD+IFR2+SAG+MS (6) 16,198.7 89.76 149.09 7,627.2 7,554.2 -12,083.6 4,528.4 5,953,609.4 353,342.2 1.7 12,901.69 MWD+IFR2+SAG+MS (6) 16,293.9 89.76 147.74 7,627.6 7,554.6 -12,164.6 4,578.2 5,953,527.4 353,390.4 1.4 12,995.41 MWD+IFR2+SAG+MS (6) 16,388.8 89.61 146.82 7,628.1 7,555.1 -12,244.5 4,629.5 5,953,446.5 353,440.0 1.0 13,088.56 MWD+IFR2+SAG+MS (6) 16,484.3 89.76 145.49 7,628.6 7,555.7 -12,323.8 4,682.7 5,953,366.1 353,491.6 1.4 13,181.95 MWD+IFR2+SAG+MS (6) 16,578.5 89.86 145.52 7,629.0 7,556.0 -12,401.4 4,736.1 5,953,287.4 353,543.4 0.1 13,273.77 MWD+IFR2+SAG+MS (6) 16,673.0 89.83 146.14 7,629.2 7,556.2 -12,479.6 4,789.1 5,953,208.2 353,594.9 0.7 13,366.05 MWD+IFR2+SAG+MS (6) 16,767.5 89.72 147.80 7,629.6 7,556.6 -12,558.9 4,840.7 5,953,127.9 353,644.8 1.8 13,458.74 MWD+IFR2+SAG+MS (6) 16,859.7 89.90 148.24 7,629.9 7,556.9 -12,637.0 4,889.5 5,953,048.8 353,692.0 0.5 13,549.36 MWD+IFR2+SAG+MS (6) 16,955.6 89.79 148.94 7,630.1 7,557.2 -12,718.9 4,939.4 5,952,966.0 353,740.3 0.7 13,643.89 MWD+IFR2+SAG+MS (6) 17,048.7 89.75 150.04 7,630.5 7,557.5 -12,799.1 4,986.7 5,952,884.8 353,786.0 1.2 13,735.94 MWD+IFR2+SAG+MS (6) 17,144.3 89.85 149.83 7,630.9 7,557.9 -12,881.9 5,034.6 5,952,801.1 353,832.2 0.2 13,830.55 MWD+IFR2+SAG+MS(6) 17,235.2 90.35 151.03 7,630.7 7,557.7 -12,960.9 5,079.5 5,952,721.2 353,875.5 1.4 13,920.54 MWD+IFR2+SAG+MS (6) 17,331.7 89.89 152.45 7,630.5 7,557.5 -13,045.9 5,125.2 5,952,635.3 353,919.5 1.5 14,016.45 MWD+IFR2+SAG+MS (6) 17,424.9 89.65 150.88 7,630.9 7,557.9 -13,127.9 5,169.4 5,952,552.4 353,962.0 1.7 14,108.99 MWD+IFR2+SAG+MS (6) 17,520.6 89.38 151.62 7,631.7 7,558.7 -13,211.8 5,215.4 5,952,467.6 354,006.3 0.8 14,203.93 MWD+IFR2+SAG+MS (6) 17,617.1 89.31 152.59 7,632.8 7,559.8 -13,297.1 5,260.6 5,952,381.4 354,049.8 1.0 14,299.88 MWD+IFR2+SAG+MS (6) 17,710.6 89.44 152.78 7,633.8 7,560.8 -13,380.1 5,303.5 5,952,297.6 354,091.0 0.2 14,392.87 MWD+IFR2+SAG+MS (6) 17,805.7 89.85 154.58 7,634.4 7,561.4 -13,465.4 5,345.6 5,952,211.5 354,131.4 1.9 14,487.63 MWD+IFR2+SAG+MS (6) 17,870.3 90.24 156.04 7,634.3 7,561.4 -13,524.1 5,372.6 5,952,152.3 354,157.2 2.3 14552.21 MWD+IFR2+SAG+MS (6) 17,932.0 90.24 156.04 7,634.1 7,561.1 -13,580.5 5,397.7 5,952,095.4 354,181.1 0.0 14,613.84 MWD+IFR2+SAG+MS (6) 1216/2019 9:53:06AM Page 7 COMPASS 5000.14 Build 85H P%D ;klq —ieg Loepp. Victoria T (CED) From: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty- Sherrod@contractor.conocophillips.com> Sent: Tuesday, December 31, 2019 11:16 AM To: Loepp, Victoria T (CED) Subject: RE: [EXTERNAL]Re: Extension of time for CD5-26 and CD5-261-1 Follow Up Flag: Follow up Flag Status: Flagged Thank you and have a safe and Happy New Year! E 9 From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov> Sent: Tuesday, December 31, 2019 10:53 AM To: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com> Subject: [EXTERNAL]Re: Extension of time for CD5-26 and CD5-261-1 Ann, Extension is granted for 1 week to Jan 10,2020. Happy New Year Ann! Victoria Sent from my Whone On Dec 31, 2019, at 10:39 AM, Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty- Sherrod@contractor.conocophillips.com> wrote: Good morning, I am writing to ask for an extension of time on the due date for CD5-26 and CD5-261-1 which is currently due on Friday, January 3, 2020. Many of the engineers involved in supplying data for the 10- 407 are out on vacation and not due to return until 1/6/20. 1 just returned from vacation on 2/30 but the person filling in for me did ask for the data we needed but I think people were already gone for vacation — taking that time off that could not be carried over to the new year. Any extension you can give us would be greatly appreciated. Thanks, Ann Schlumberger Drilling & Measurements Product Delivery Customer: ConocoPhillips Alaska, Inc. Dispatched To: Well Name: CD5-26L1 Date Dispatched Service Order #: 19AKA0087 21 9108 31625 Transmittal #: 10DEC19-SP02 AOGCC: Natural Resource Tech 10 -Dec -19 Dispatched By: Stephanie Pacillo Product I Description Hardcopy Digital Copy Logging Date LWD Recorded Mode Prints: N/A Contents on CD 18 -Nov -19 Scope*Service 2" MD / TVD x 5" MD / TVD x R CEIVE EC 10 2019 OGCC Digital Data N/A Contents on CD DLIS / LAS Data x Surveys N/A Contents on CD Directional Survey Nad27 x Directional Survey Nad83 x CD 1 CD Contents on CD Data: DLIS/ LAS x Graphics: PDF x Surveys: PDF/TXT x Please sign and email a copy to: Please sign and email a copy to: Tom.Osterkamp(a)conocophillips.com Alaska PTSPrintCenter(a)slb.com Attn: Tom Osterkamp Attn: Stephanie Pacillo A±(,� (I Received By: I THE STATE 'ALASKA GOVERNOR MIKE DUNLEAVY Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.aogcc.claska.gov Re: Colville River Field, Alpine Oil Pool, CRU CD5-26L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 219-108 Surface Location: 438' FNL, 2919' FEL, SEC. 18, TI IN, R4E, UM Bottomhole Location: 3404' FNL, 2616' FEL, SEC. 4, TI ON, R4E, UM Dear Mr. : Enclosed is the approved application for the permit to redrill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 219-107, API No. 50-103- 20806-00-00. Production should continue to be reported as a function of the original API number stated above. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. Sincerely, 4--/� Daniel T. Seamount, Jr. Commissioner DATED this t -S-- of August, 2019. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION PERMIT TO DRILL 20 AAC 25.005 'e JUS. L Q go 1a. Type of Work: b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ❑ 1c. Specify if well is proposed for: DrillLateral ti Stratigraphic Test ❑ Development - Oil L]' Service - Winj ❑ Single Zone ❑✓ ' Coalbed Gas 11`"Ga" 'Hyffrates El Redrill Reentry ❑ Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q Single Well ❑ 11. Well Name and Number: ConocoPhillips Bond No. 59-52-180 CRU-CD5-26L1 ' 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, Alaska, 99510-0360 MD: 29814 TVD: 7804 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation: Surface: 438' FNL, 2919' FEL, Sec. 18, T11N, R4E, UM ASRC-NPR4,ASRC-AA092344,ASRC-NPR2 Top of Productive Horizon: 8. DNR Approval Number: 13. Approximate Spud Date: 90' FNL, 4681' FEL, Sec. 29, T11 N, R4E, UM 932669, 340757, 932128 8/10/2019 9- Za' "'! -` Total Depth: 9. Acres in Property: 14. Distance to Nearest Property: 3404' FNL, 2616' FEL, Sec. 4, T10N, R4E, UM 5032, 3122, 8719, 3200 4695' to ASRC-NPR5 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 74.5 ' 15. Distance to Nearest Well Open Surface: x- 349057 y- 5965780 f Zone- 4 GL / BF Elevation above MSL (ft): 33.7 to Same Pool: 1542' CD5-25L1 16. Deviated wells: Kickoff depth: feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.035) Maximum Hole Angle: ax90 degrees Downhole: 3950 • Surface: 3169 18. Casing Program: Specifi ations Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight I Grade Coupling Length MD TVD MD TVD (including stage data) 42" 20" 78.6 B Welded 79 41 41 120 120 10 yds 13.5" 10.75" 45.5 L-80 TXP 2206 41 41 2247 2189 978sx 11.0ppg, 271 s 15.8ppg G 9.875x11" 7.625" 29.7 L-80 TXP 14054 41 41 14095 7575 978sx 15.8ppg Class G 6.5" 4.5" 12.2 L-80 T -Blue 15714 14100 7575 29814 7804 Lined with blank pipe and frac ports 19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes[-] No ❑✓ 20. Attachments: Property Plat ❑ BOP SketchDrilling Program Time v. Depth Plot Shallow Hazard Analysis e e Diverter Sketch E] Seabed Report Drilling Fluid Program 20 AAC 25.050 requirementse 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Matt Smith Authorized Name: Chip Alvord Contact Email: matt.smithUftop.com Authorized Title: Drilling Manageer%r�� Contact Phone: 907-263-4324 / ( ft Authorized Signature: I< -1. t Date: Commission Use Only Permit to Drill /--n� API Number-,,-,, �/ / 'tC1�- Permit Approval ( 1q See cover letter for other Number: 50- ate: requirements. Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, as hydrates, or gas contained in shales:Fer Other: /?0 {J fps f f p �? Jt da �� SSam fps req'd: Yes ❑ o [Tt� Mud log req'd: Yes ❑ o [� 5W Y No // a r rt t�C fC✓ � t Z )Q,. me res: Yes ❑� Directional svy req'd: Yes [vNo ❑ Spacing exception req'd: Yes E] No Lti J Inclination -only svy req'd: Yes ❑ NoF�r' Post initial injection MIT req'd: Yes ❑ NoL� APPROVED BY �'�`� �y Approved by4v�� COMMISSIONER THE COMMISSION Date: / l Form 10-401 Revised 5/2017 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g) ORIGINAL d"010'0�1'17 Submit Form and Attachments in Duplicate ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 July 25, 2019 Alaska Oil and Gas Conservation Commission 333 West Th Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-26L1 Dear Sir or Madam: ConocoPhillips ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig Doyon 25. The intended spud date for this well is 9/28/2019. CRU CD5-26L 1 is planned to be an Alpine C Sand upper lateral producer out of the CD5-26 parent well (covered in separate PTD). When the CD5-26L 1 is commenced, the parent well will have run and cemented 10-3/4" surface casing to above the C30 Sand. 7-5/8" intermediate casing will have been run and cemented to 250' TVD above the uppermost hydrocarbon bearing interval. A 6-1/2" lateral will have been drilled in the Alpine A Sand and lined with a 4-1/2" liner, with a whipstock set above for the CD5-26L 1 kickoff in the Alpine C Sand. The CDS-26L 1 lateral will then be drilled in the Alpine C Sand and partially lined with 4-1/2" liner. The well will be completed with a 4-1/2" upper completion. A waiver is requested to set the production acke approximately 1,000' above the casing shoe as per 20 AAC 25.412(b). n p W I`Vte� ti z�C�'7 -rh i 513 ri-c q ki r "i -�- G fa Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser set up. If you have any questions or require further information, please contact Greg Hobbs at 263-4749 (greg.s.hobbs@ConocoPhillips.com) or Chip Alvord at 265-6120. Sincerely, cc: Matthew Digitally signed by CD5-26L1 Well File/ Ann Haggerty -Sherrod ATO 1530 Matthew Smith Johnson N oku ATO 1720 Smith Date: 2019.07.29 � 12:13:07-0a'00' Chip Alvord ATO 1570 Matt Smith Katheryn Hoffineister ATO 1760 Drilling Engineer Lanston Chin Kuukpik Corp Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 CD5-26L1 Application for Permit to Drill Document ConocoPhillips Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 ()9)............................................................ 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................3 Requirements of 20 AAC 25.050(b)............................................................................................................. 3 3. Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) .........................4 5. Procedure for Conducting Formation Integrity Tests (Requirements of'20AAC 25.005 (e) (5)).......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))...........5 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) ..........................5 8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .................................... 6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of'20AAC 25.005 (c)(10)) ..........................................7 11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) .........................7 12. Evidence of Bonding (Requirements of20 AAC 25.005 (c)(12)) ...................................7 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) .........................7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal .......................8 (Requirements of 20 AAC 25.005 (c)(14))............................................................................. 8 15. Attachments................................................................................................................8 Attachment I Cement Summary.................................................................................................................. 8 CD5-26L1 APD Page 1 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 Attachment 2 Drilling Hazards Summary.................................................................................................... 8 Attachment 3 Completion Schematic........................................................................................................... 8 Attachment 4 Directional Plan...................................................................................................................8 CD5-26L1 APD Page 2 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 1. Well Name (Requirements of 20 AAC 25.005 (fl) The well for which this application is submitted will be designated as CRU CD5-26L1 2. Location Summary (Requirements of20AAC25.005(c)(2)) Location at Surface 438' FNL, 2919' FEL, Sec. 18, TI IN, ME, UM NAD 1927 RKB Elevation 74.5' AMSL Northings: 5,965,780 Total Vertical Depth, RKB: 7,804' Eastings: 349,057 Pad Elevation 33.7' AMSL Top of Productive Horizon Heel 90' FNL, 4681' FEL, Sec. 29, T1IN, ME, UM NAD 1927 Measured Depth, RKB: 14,095 Northings: 5,955,499 Total Vertical Depth, RKB: 7,575' Eastings: 352,409 Total Vertical Depth, SS: 7,500' Total Depth Toe 3404' FNL, 2616' FEL, Sec. 4, TI ON, ME, UM NAD 1927 Northings: 5,941,489 Eastings: 359,528 Measured Depth, RKB: 29,814 Total Vertical Depth, RKB: 7,804' Total Vertical Depth, SS: 7,729' Requirements of 20 AA 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. 3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 25. CD5-26L 1 APD Page 3 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-26L1 Saved: 29 -Jul -19 4. Drilling Hazards Information (Requirements of20 AAC 25.005 (c)(4)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size in Csg Setting Depth MD/TVD ft Fracture Gradient(psi)si Pore pressure ASP Drilling 20 120/ 120 10.9 51 56 10.75 2,247 / 2,189 14.5 964 1,432 7.625 15,280 / 7,713 12.5 3,950 3 169 4.5 29,814 / 7,804 12.5 3,950 n/a PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP) ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows: 1) ASP = [(FG x 0.052) - o.l]*D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in Ib/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 =Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP =FPP - (0.1 x D) Where: FPP = Formation Pore Pressure at the next casing point FPP = 0.4525 x TVD 1. ASP CALCULATIONS Drilling below 20" conductor ASP = [(FG x 0.052) - 0.1] D _ [(10.9 x 0.052) - 0.1 ] x 120 = 56 psi OR ASP = FPP - (0.1 x D) = 964 - (0.1 x 2189') = 745 psi Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.1] D _ [(14.5 x 0.052) - 0.1] x 2189' = 1432 psi OR ASP= FPP-(0.1 x D) = 3950 - (0.1 x 7713') = 3175 psi Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1] D _ [(12.5 x 0.052) - 0.1] x 7713 = 4268 psi OR ASP = FPP - (0.1 x D) = 3950- (0.1 x 7804') = 3169 psi CD5-260 APD Page 4 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-26L1 Saved: 29 -Jul -19 (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensityfor differential sticking; Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC25.005 (c)(s)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casing and Cementin Y, Program Csg,,Tbg Hole Size Weight Grade Conn. Length Top MD/'TVD Btm MD7TVD Cement Program OD (in) (Iblft) (ft) (ft) (ft) 20 42 94 H-40 Welded 80 41/41 120/ 120 10 yards Cement to Surface with 10.75 13.5 45.5 L-80 TCM 2,206 41/41 2,247 / 2,189 978 sx DeepCrete Lead 11.0 ppg, 271 sx Class G Tail Slurry 15.8 ppg 7.625 X875 29.7 L-80 BTCM 15,239 41/41 15,280 / 7,713 978 sx of Class G at 15.8 ppg 4.5 6.5 12.2 L-80 Blue 18,604 14,100 / 7,575 29,814 / 7,808 No cement, Perforation Sub 7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, more than twenty-four penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. CD5-26L1 APD Page 5 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-26L1 Saved: 29 -Jul -19 8. Drilling Fluid Program (Requirements of 20AAC25.005(c)(8)) Production Hole: The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 — 9.5 ppg with calcium carbonate and KCI and utilize MPD for adding backpressure during connections. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-26L1 APD Page 6 of 13 Printed: 29 -Jul -19 Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.5 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0-10.0 9.6— 10.8 8.8-9.5 PV cP 30-80 10 10 YP Ib./100 ftz 100-200 20- 28 10- 15 Funnel Viscosity s/qt. 300 50-60 40-50 Initial Gels Ib./100 ftz 50 10 6 30 Minute Gels Ib./100 ft2 60 15 8 API Fluid Loss cc/30 min. N.C. — 15.0 5.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0— 12.0 10.0 pH 11.0 9.5-10.0 9.0-9.5 Production Hole: The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 — 9.5 ppg with calcium carbonate and KCI and utilize MPD for adding backpressure during connections. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-26L1 APD Page 6 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of20 AAC 25.005 (c)(11)) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. End PTD for CD5-26 and begin PTD for CD5-26L1. 2. Pick up and run in hole with 6-1/2" drilling BHA. 3. Drill 6-1/2" hole to section TD (LWD Program: GR/RES) 4. Pull out of hole with drilling BHA. 5. Run 4.5" perforated pup liner, plop and drop in Alpine C lateral. 6. Run in hole whipstock retrieval BHA and retrieve whipstock. 7. RIH with 4.5" tubing with Baker Premier production packer. NOTE: A waiver is requested to set the production packer approximately 1000' MD above the intermediate casing shoe as per 20 AAC 25.412(b). This is to set the packer above the C sand window and maintain slickline accessibility to secure the well in the future. 8. Space out and land hanger. 9. Pressure test hanger seals to 5000 psi. 10. Drop ball and rod to set production packer, test tubing to 4,200 psi, chart test. 11. Bleed tubing pressure to 2,200 psi and test IA to 3,850 psi, chart test. 12. Install HP-BPV and test to 2,500 psi. 13. Nipple down BOP. 14. Install tubing head adapter assembly. N/U tree and test tree to 5000 psi/]0 minutes. 15. Freeze protection tubing and annulus. 16. Secure well. RDMO. CD5-26L 1 APD Page 7 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261_1 Saved: 29 -Jul -19 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CD5-26 will be injected into a permitted surface casing x production casing annulus on CD5. The CD5-26 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre -drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir. Once CD5-26 has been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi = (12.0 ppg) * (0.052) * (2,189') + 1,500 psi = 2,866 psi Pore Pressure = 1,049 psi Th erefore Differential = 2,866 — 1,049 = 1,817 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt Grade Range Connection Collapse 85% of Burst 85% of (ppf) Type Collapse Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi 15. Attachments Attachment 1 Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-26L1 APD Page 8 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 Attachment 1 — Cement Summary CD5-26L1 Cementing Program: CD5-26 Cement Schematic 9-7/8" x 11" Hole 20" 94# H-40 Welded Conductorto 115 10-3/4" 45,5# L-80 HYD5631BTCM 2,247 MD 12,189' TVD @ 31° inc. Top of Cement 12,936 MD 17,120' TVD Kuparuk C 13, 510' M D 17, 370' TV D KOP in Alpine C Alpine 14,09514 14,092' MD 17,574' TVD , 4 7-518" 293 L-80 HYD563 X BTCM Alpine A `, Casing 16,025' MD 17,767' TVD \\ 15,28010 / 7,713' TVD @ 84° \ 4 \ � r f I \ C D5-26 A Sand 6-1/2" Hole i CD5-26L 1 C Sand 6-1/2" Hole 33,734'MD17,874@89' :� 29,814'MD17,804@89' CD5-26L1 APD Page 9of13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 10.75" Surface Casing run to 2,247' MD / 2,189' TVD Cement from 2247' MD to 1747'(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 174' to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1325' MD), zero excess in 20" conductor. Lead slurry from 1,747' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (120'- 41� X 1.3645 ft3/ft X 1.0 (0% excess) = 108 ft3 Permafrost to Conductor (1,325'- 120') X 0.3637 ft3/ft X 3.5 (250% excess) = 1,547 ft3 Top of Tail to Permafrost (1,747'- 1,325') X 0.3637 ft3/ft X 1.5 (50% excess) = 232 ft3 Total Volume = 108 + 1,547 + 232 = 1,887 ft3 => 978 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk Tail slurry from 2,247' MD to 1,747' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,249' -1,747 X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3 Shoe Joint (80� X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft3 Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casing run to 15,318' MD / 7,760' TVD Top of slurry is designed to be at 12,936' MD, which is 250' TVD above the prognosis shallowest hydrocarbon bearing zone Kuparuk C. Assume 40% excess annular volume. * 1 I" Under reamer is 90' above the 9-7/8" bit. Tail slurry from 15,280' MD to 12,9736' MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8" Hole (15,280'- 15,200 X 0.2148 ft3/ft X 1.40 (40% excess) = 27 ft3 11"Hole to to Top of Cement ft(15,200'- , 12,936 X 0.3428 ft3/ft X 1.40 (40% excess) = 1,086 Shoe Joint (80� X 0.2578 ft3/ft X 1.0 (0% excess) = 21 ft3 Total Volume = 27+1,086 + 21 = 1134 ft3 => 978 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.16 ft3/sk CD5-26L1 APD Page 10 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 13-1/2" Hole / 10-3/4" Casing Interval Event Risk Level I Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gro single shots, traveling cylinder diagrams Monitor well at base of permafrost, increased mud weight, decreased Gas Hydrates Low mud viscosity, increased circulating times, controlled drilling rates, Abnormal Reservoir Pressure Low low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use Hydrogen Sulfide gas Low weighted sweeps. Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of low density cement slurries 9-7/8" x 11" Hole / 7-5/8" Casing Interval Event Risk Level Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. No mapped faults occur across the path of the planned wellbore. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/2" Open Hole Production Interval Event Risk Level I Mitigation Strategy Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. H2S drills, detection systems, alarms, standard well control practices, Hydrogen Sulfide gas Low mud scavengers CD5-26L 1 APD Page 11 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 Well Proximitv Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset production has the potential to reduce the reservoir pressure. LCM material will be on location to deal with losses. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-26L1 APD Page 12 of 13 Printed: 29 -Jul -19 Application for Permit to Drill, Well CRU CD5-261-1 Saved: 29 -Jul -19 Attachment 3 — Completion Schematic (includes Alpine C lateral, as detailed in CD5-261-1 PTD) CD5 - 26 Alpine AIC Dual Lateral Producer Proposed Schematic C sand Lateral 4-l' x 1" GLM 6 1l2' Hole TD 14,095'- 29,814' MD --————————————————————————————————————— — — — — — I 4 Yr" 12.6# L-80 Hyd 563 Liner wi pert pups 0 0 0 0 0 0 o I i y------------------------------------------I Upper TNT Packer 4-'" 12.6# L-80 Hyd563 Liner wl frac ports HP Sliding sleeve for / Selectivity 0 0 o 0 0 0 0 o o ID — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I 3-1f2" 9.3#TN110SS TNT Production Packer Asand Lateral at 6 1/2" Hole TD 14,650' MD ZXP liner top packer 15,280'— 33,734' MD at 15.130' MD CD5-26L1 APD Page 13 of 13 Printed: 29 -Jul -19 I 20" 94# HA0 Welded Upper Completion: Conductor to 115' MD 1) 4 f°-126# Hyd 563 tubing I 2) Shallow nipple profile 3.813" ID I 3) 4-X' x 1" Camco KBMG GLM (xx') vr1DCK2 I pinned for 2500 psi casing to tbg sheaf 4) TNT Packer 5) X Nipple profile, 2.813" I 6) TNT Packer I 7) X Nipple profile, 2.813" I 10-314" 45.5# L-80 HYD 563 x Lower Completion: I BTC 8) Plop and drop liner in C sand Surface Casing at 2,247' MD - no junction -4.5" 12.6# L-80 wl pert pups I 9) ZXP liner top packer & Flexlock Liner Hanger 4-f' x 1" GLM XO 5" Hydril 521 Box X 4-Y,' H563 pin I I I -4.5" Hydril563 12.6# L-80 wl Frac Ports I I I I I 4-1 r2" 12.6# L-80 Hyd 563 I I I I I 4-V x 1" GLM I I 7 518" 29.7# L-80 TXP I Intermediate Casing at 15,280' MD I I I 39# at heel C sand Lateral 4-l' x 1" GLM 6 1l2' Hole TD 14,095'- 29,814' MD --————————————————————————————————————— — — — — — I 4 Yr" 12.6# L-80 Hyd 563 Liner wi pert pups 0 0 0 0 0 0 o I i y------------------------------------------I Upper TNT Packer 4-'" 12.6# L-80 Hyd563 Liner wl frac ports HP Sliding sleeve for / Selectivity 0 0 o 0 0 0 0 o o ID — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — I 3-1f2" 9.3#TN110SS TNT Production Packer Asand Lateral at 6 1/2" Hole TD 14,650' MD ZXP liner top packer 15,280'— 33,734' MD at 15.130' MD CD5-26L1 APD Page 13 of 13 Printed: 29 -Jul -19 11:55, July 25 2019 1 DDI r 300 CD5-26U wp07 15120 - 15320 10320 - 15510 7.361 Plan Summar -`. 15510 - 15700 Q) 5 7-5/8 x 9-7/8 CoP DE 15700 - 16290 U) m 4-1/2 x 6-3/4 I 6880 - ,7460 o 1 17460 - ,8050 70 90 18050 - 18640 / 18640 - 19220 ance - I !1 19220 - ,9810 - 0 19810 - 20400 16875 20250 23625 27000 30375 6 20400 - 21580 21580 - 22750 o Measured Depth Plan D25 @ 74.50usft (D25) L O 7-5/8 x 9 7/8 N po 0 0. 0 0 4-1/2 x 6-3/4 n q 0 0 0 0 0 0 0'o 0 N N CV N u7 O ^ O O > O on '. �• _.. 0 0 14350 10500 14000 17500 21000 24500 28000 3150 330 30 14350 - 14540 Horizontal Departure 90 CD5-26 07 14540 - 14740 14740 - 14930 14930 - 15120 O `( GDS 26 wp0 I 455 -- --------------- ----------- ----- - - -- --- - _ a� I CD5-26p0 028 f.._.. Equivalent Magnetic Dist d 0 - 14300 14400 14500 14600 14700 14800 14900 15000 240 120 22750 -- 23930 23930 - 25110 Measured Depth 9 25110 - 26290 26290 27460 m Depth FroDepth To Survey/Plan Tool 210 i 150 27460 --" 28640 40.80 2200.00 CD5-26 wp07 (CD5-26) GYD-GC-SS 28640 29815 2200.0014350.00 CD5-26 wp07 (G05-26) MWD+IFR2+SAG+MS 180 14350.0014750.00 CD5-26L1 wp07 (CD5-26L1) MWD -INC ONLY (INC>10D TVD MD Name 14750.0016250.00 CD5-26L1 wp07 (CD5-26L1) MWD OWSG 7617.84 14351.00 7-5/8 x 9-7/6 14750.00 29814.46 CD5-26L1 wp07 (CD5-26L1) MWD+IFR2+SAG+MS 7804.50 29814.56 4-1/2 x 6-3/4 Magnetic Model & Date: BGGM2018 01 -Nov -19 Magnetic North is 15.890 East of True North (Magnetic Declination) Magnetic Dip & Field Strength: 80.71 ° 57361 nT Sec MD Inc Azi TVD +N/ -S +FJ -W Dleg TF.. VSect Target Annotation 1 14350.00 84.09 152.00 7617.75 -10435.52 3678.33 0.00 0.00 11021.75 KOP: 16'/100' DLS, 25° TF, for 13' Lithology Column 214363.00 85.98 152.89 7618.88 -10447.00 3684.32 16.00 25.0011034.69 Hold for 20' 314383.00 85.98 152.89 7620.28 -10464.76 3693.42 0.00 0.0011054.62 Start 4°/100' DLS, -15.73° TF, for 134.25 414517.25 91.15 151.43 7623.64 -10583.39 3756.07 4.00 -15.7311188.54 Hold for 56.84' 514574.09 91.15 151.43 7622.50 -10633.29 3783.25 0.00 0.0011245.22 CD5-2611 Tgt 01 Start 1'/100' DLS, 165.39° TF, for 190.67' 614764.76 89.30 151.91 7621.75 -10801.12 3873.72 1.00 165.3911435.45 Hold for 15049.81' 729814.56 89.30 151.91 7804.50 -24077.40 10959.17 0.00 0.0026454.20 CD5-2611 Tgt 02 TD: 29614.56' MD, 7804.5' TVD I I I By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all I surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit packl y approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 1 100 feet lateral tolerance. repared by Checked by r 300 -6 60 15120 - 15320 10320 - 15510 S. DeLapp V. Osara 15510 - 15700 J. Ryan CoP DE 15700 - 16290 3 16290 16880 6880 - ,7460 1 17460 - ,8050 70 90 18050 - 18640 / 18640 - 19220 ance - !1 19220 - ,9810 - / 1 / 19810 - 20400 6 20400 - 21580 21580 - 22750 14300 14400 14500 14600 14700 14800 14900 15000 240 120 22750 -- 23930 23930 - 25110 Measured Depth 9 25110 - 26290 26290 27460 m Depth FroDepth To Survey/Plan Tool 210 i 150 27460 --" 28640 40.80 2200.00 CD5-26 wp07 (CD5-26) GYD-GC-SS 28640 29815 2200.0014350.00 CD5-26 wp07 (G05-26) MWD+IFR2+SAG+MS 180 14350.0014750.00 CD5-26L1 wp07 (CD5-26L1) MWD -INC ONLY (INC>10D TVD MD Name 14750.0016250.00 CD5-26L1 wp07 (CD5-26L1) MWD OWSG 7617.84 14351.00 7-5/8 x 9-7/6 14750.00 29814.46 CD5-26L1 wp07 (CD5-26L1) MWD+IFR2+SAG+MS 7804.50 29814.56 4-1/2 x 6-3/4 Magnetic Model & Date: BGGM2018 01 -Nov -19 Magnetic North is 15.890 East of True North (Magnetic Declination) Magnetic Dip & Field Strength: 80.71 ° 57361 nT Sec MD Inc Azi TVD +N/ -S +FJ -W Dleg TF.. VSect Target Annotation 1 14350.00 84.09 152.00 7617.75 -10435.52 3678.33 0.00 0.00 11021.75 KOP: 16'/100' DLS, 25° TF, for 13' Lithology Column 214363.00 85.98 152.89 7618.88 -10447.00 3684.32 16.00 25.0011034.69 Hold for 20' 314383.00 85.98 152.89 7620.28 -10464.76 3693.42 0.00 0.0011054.62 Start 4°/100' DLS, -15.73° TF, for 134.25 414517.25 91.15 151.43 7623.64 -10583.39 3756.07 4.00 -15.7311188.54 Hold for 56.84' 514574.09 91.15 151.43 7622.50 -10633.29 3783.25 0.00 0.0011245.22 CD5-2611 Tgt 01 Start 1'/100' DLS, 165.39° TF, for 190.67' 614764.76 89.30 151.91 7621.75 -10801.12 3873.72 1.00 165.3911435.45 Hold for 15049.81' 729814.56 89.30 151.91 7804.50 -24077.40 10959.17 0.00 0.0026454.20 CD5-2611 Tgt 02 TD: 29614.56' MD, 7804.5' TVD I I I By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all I surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit packl y approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a 1 100 feet lateral tolerance. repared by Checked by ccepted by Approved by: S. DeLapp V. Osara J. Ryan CoP DE O CL r J C� N I a W 0� c� -- � q x N LOdM L�9Z-5C1 518fi C 0006eCb i 0008? _ N OOOL 00098 OOOS OOot F 000c 000 --T 0 0 0 0 00 0 LO Ln o co yidaa IBai}aaA anal 0 0 p �o 0 m N C) o p CO u Lq LO T 0 p U N dp U) T 5 U i 0 0 LO 0 T 0 O Ap 1 ` 0 0 LO co p 0 0 CD T 0 J O O O O O O O O O O O O y}da�EaiIaalA anarn a rn O O O LO T O O ,I4 T C) MCS l'MW J T C) O N C'7 T O C'7 LO L6 LO O T O a N T U U N Cf) O U O + O CV T C) C) V T T O O 00 O T C) C) N O T Qj O C) 0 LON Q1 O ■ y= p O� ��? o O C N CIO C) _ O LO T A, 0 O p Op O� x N r + +�+ p OO p0 O OOO Opp O� O T x in ctS LLJ O O O Op p' O r� N T O O o opp� f O0 N cLO < __ � o Opoo 0 6,� !f $oo��� CD � C^ co CLN C TCD O TOM x O J Cfl a N ° CD O Q o CD OO 0 0 O 0 O O o O C) L9 O o O U') O O o m T (+)yiaON/(-)qI noS N N ConocoPhillips Alaska Inc WNS Western North Slope C135 Alpine West Pad Plan: CD5-26 (11C) - Slot 26 50103xxxxx00 CD5-261-1 Plan: C135-261-1 wp07 Standard Proposal Report 25 July, 2019 ConocoPhilli s p Conocoph it I i ps Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-26 (11 C) Wellbore: CD5-261_1 Design: CD5-261_1 wp07 Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD5-26 (11 C) -Slot 26 Plan D25 @ 74.50usft (D25) Plan D25 @ 74.50usft (D25) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor Site CD5 Alpine West Pad Site Position: From: Map Position Uncertainty: 0.00 usft Well Plan CD5-26 (11 C) -Slot 26 Well Position +N/ -S -4.65 usft +E/ -W -160.86 usft Position Uncertainty 0.00 usft Ground Level: 33.70 usft Wellbore CD5-26L1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength (nT) BGGM2018 11/1/2019 15.89 80.71 57,361 Design CD5-26L1 wp07 Audit Notes: Version: Phase: PLAN Tie On Depth: Vertical Section: Depth From (TVD) +N/ -S +E/.W (usft) (usft) (usft) 40.80 0.00 0.00 Plan Survey Tool Program Date 7/25/2019 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 14,350.00 14,750.00 CD5-261_1 wp07 (CD5-261-1) MWD-INC—ONLY (INC>10°) MWD-INC—ONLY—FILLER (IN, 2 14,750.00 16,250.00 CD5-26L1 wp07 (CD5-26L1) MWD OWSG OWSG MWD - Standard 3 14,750.00 29,814.46 CD5-26L1 wp07 (CD5-26L1) MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + A 14,350.00 Direction 155.53 725/2019 12:07 33PM Page 2 COMPASS 5000.14 Build 85H ConocoPhillips philli Database: EDT 14 Alaska Production Company: ConocoPhillips Alaska Inc_WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-26 (11C) Wellbore: CD5-261-1 Design: CD5-261-1 wp07 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD5-26 (11 C) - Slot 26 Plan D25 @ 74.50usft (D25) Plan D25 @ 74.50usft (D25) True Minimum Curvature Plan Sections I Measured Vertical Dogleg Build Tum Depth Inclination Azimuth Depth +NIS +E/ -W Rate Rate Rate TFO (usft) (°) (°) (usft) (usft) (usft) (°/100usft) (°1100usft) (°1100usft) (°) Target 14,350.00 84.09 152.00 7,617.75 -10,435.52 3,678.33 0.00 0.00 0.00 0.00 14,363.00 85.98 152.89 7,618.88 -10,447.00 3,684.32 16.00 14.51 6.78 25.00 14,383.00 85.98 152.89 7,620.28 -10,464.76 3,693.42 0.00 0.00 0.00 0.00 14,517.25 91.15 151.43 7,623.64 -10;583.39 3,756.07 4.00 3.85 -1.08 -15.73 14,574.09 91.15 151.43 7,622.50 -10;633.29 3,783.25 0.00 0.00 0.00 0.00 CD5-2611T9t 01 14,764.76 89.30 151.91 7,621.75 -10,801.12 3,873.72 1.00 -0.97 0.25 165.39 29,814.56 89.30 151.91 7,804.50 -24,077.40 10,959.17 0.00 0.00 0.00 0.00 CD5-261-1 Tgt 02 7/25/2019 12:07*33PM Page 3 COMPASS 5000. 14 Build 85H ConocoPhillips Database: EDT 14 Alaska Production local Co-ordinate Reference Company: ConocoPhillips Alaska Inc WNS TVD Reference: Project: Western North Slope MD Reference: Site: CD5 Alpine West Pad North Reference: Well: Plan: CD5-26 (11 C) Survey Calculation Method: Wellbore: CD5-261-1 Dogleg Design: CD5-261-1 wp07 Depth Inclination ConocoPhillips Standard Proposal Report Well Plan: CD5-26 (11 C) - Slot 26 Plan D25 @ 74.50usft (D25) Plan D25 @ 74.50usft (D25) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +NIS +E/ -W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100usft) (°/100usft) (°/100usft) 14,350.00 84.09 152.00 7,617.75 -10,435.52 3,678.33 11,021.76 0.00 0.00 0.00 KOP: 16°/100' DLS, 25° TF, for 13' 14,351.00 84.24 152.07 7,617.85 -10,436.40 3,678.80 11,022.75 16.00 14.50 6.80 7-618 x 8-7/8 14,363.00 85.98 152.89 7,618.88 -10,447.00 3,684.32 11,034.69 16.00 14.51 6.78 Hold for 20' 14,383.00 85.98 152.89 7,620.28 -10,464.76 3,693.42 11,054.62 0.00 0.00 0.00 Start 4°/100' DLS, -15.73° TF, for 134.25' 14,400.00 86.63 152.70 7,621.37 -10,479.85 3,701.17 11,071.56 4.00 3.85 -1.09 14,500.00 90.49 151.62 7,623.89 -10,568.23 3,747.85 11,171.34 4.00 3.85 -1.08 14,517.25 91.15 151.43 7,623.64 -10,583.39 3,756.07 11,188.54 4.00 3.85 -1.08 Hold for 56.84' 14,574.09 91.15 151.43 7,622.50 -10,633.29 3,783.25 11,245.22 0.00 0.00 0.00 Start 1°/100' DLS, 165.39° TF, for 190.67' 14,600.00 90.90 151.50 7,622.04 -10,656.06 3,795.63 11,271.07 1.00 -0.97 0.25 14,700.00 89.93 151.75 7,621.31 -10,744.04 3,843.15 11,370.83 1.00 -0.97 0.25 14,764.76 89.30 151.91 7,621.75 -10,801.12 3,873.72 11,435.45 1.00 -0.97 0.25 Hold for 15049.81' 14,800.00 89.30 151.91 7,622.17 -10,832.21 3,890.32 11,470.62 0.00 0.00 0.00 14,900.00 89.30 151.91 7,623.39 -10,920.43 3,937.40 11,570.42 0.00 0.00 0.00 15,000.00 89.30 151.91 7,624.60 -11,008.64 3,984.48 11,670.21 0.00 0.00 0.00 15,100.00 89.30 151.91 7,625.82 -11,096.86 4,031.56 11,770.00 0.00 0.00 0.00 15,200.00 89.30 151.91 7,627.03 -11,185.07 4,078.64 11,869.80 0.00 0.00 0.00 15,300.00 89.30 151.91 7,628.25 -11,273.29 4,125.72 11,969.59 0.00 0.00 0.00 15,400.00 89.30 151.91 7,629.46 -11,361.50 4,172.80 12,069.38 0.00 0.00 0.00 15,500.00 89.30 151.91 7,630.67 -11,449.72 4,219.88 12,169.18 0.00 0.00 0.00 15,600.00 89.30 151.91 7,631.89 -11,537.94 4,266.96 12,268.97 0.00 0.00 0.00 15,700.00 89.30 151.91 7,633.10 -11,626.15 4,314.04 12,368.77 0.00 0.00 0.00 15,800.00 89.30 151.91 7,634.32 -11,714.37 4,361.12 12,468.56 0.00 0.00 0.00 15,900.00 89.30 151.91 7,635.53 -11,802.58 4,408.20 12,568.35 0.00 0.00 0.00 16,000.00 89.30 151.91 7,636.75 -11,890.80 4,455.28 12,668.15 0.00 0.00 0.00 16,100.00 89.30 151.91 7,637.96 -11,979.01 4,502.36 12,767.94 0.00 0.00 0.00 16,200.00 89.30 151.91 7,639.17 -12,067.23 4,549.44 12,867.73 0.00 0.00 0.00 16,300.00 89.30 151.91 7,640.39 -12,155.45 4,596.52 12,967.53 0.00 0.00 0.00 16,400.00 89.30 151.91 7,641.60 -12,243.66 4,643.60 13,067.32 0.00 0.00 0.00 16,500.00 89.30 151.91 7,642.82 -12,331.88 4,690.68 13,167.11 0.00 0.00 0.00 16,600.00 89.30 151.91 7,644.03 -12,420.09 4,737.76 13,266.91 0.00 0.00 0.00 16,700.00 89.30 151.91 7,645.25 -12,508.31 4,784.84 13,366.70 0.00 0.00 0.00 16,800.00 89.30 151.91 7,646.46 -12,596.52 4,831.92 13,466.50 0.00 0.00 0.00 16,900.00 89.30 151.91 7,647.67 -12,684.74 4,879.00 13,566.29 0.00 0.00 0.00 17,000.00 89.30 151.91 7,648.89 -12,772.95 4,926.08 13,666.08 0.00 0.00 0.00 17,100.00 89.30 151.91 7,650.10 -12,861.17 4,973.16 13,765.88 0.00 0.00 0.00 17,200.00 89.30 151.91 7,651.32 -12,949.39 5,020.24 13,865.67 0.00 0.00 0.00 17,300.00 89.30 151.91 7,652.53 -13,037.60 5,067.32 13,965.46 0.00 0.00 0.00 17,400.00 89.30 151.91 7,653.75 -13,125.82 5,114.40 14,065.26 0.00 0.00 0.00 17,500.00 89.30 151.91 7,654.96 -13,214.03 5,161.48 14,165.05 0.00 0.00 0.00 17,600.00 89.30 151.91 7,656.17 -13,302.25 5,208.56 14,264.84 0.00 0.00 0.00 17,700.00 89.30 151.91 7,657.39 -13,390.46 5,255.64 14,364.64 0.00 0.00 0.00 17,800.00 89.30 151.91 7,658.60 -13,478.68 5,302.72 14,464.43 0.00 0.00 0.00 17,900.00 89.30 151.91 7,659.82 -13,566.90 5,349.80 14,564.23 0.00 0.00 0.00 18,000.00 89.30 151.91 7,661.03 -13,655.11 5,396.88 14,664.02 0.00 0.00 0.00 18,100.00 89.30 151.91 7,662.25 -13,743.33 5,443.96 14,763.81 0.00 0.00 0.00 18,200.00 89.30 151.91 7,663.46 -13,831.54 5,491.04 14,863.61 0.00 0.00 0.00 7/25/2019 12:0733PM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD5-26 (11 C) - Slot 26 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Plan D25 @ 74.50usft (D25) Project: Western North Slope MD Reference: Plan 025 @ 74.50usft (D25) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-26 (11 C) Survey Calculation Method: Minimum Curvature Wellbore: CD5-26L1 Design: CD5-261-1 wp07 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/ -S +El -W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100usft) (°1100usft) (°/100usft) 18,300.00 89.30 151.91 7,664.68 -13,919.76 5,538.12 14,963.40 0.00 0.00 0.00 18,400.00 89.30 151.91 7,665.89 -14,007.97 5,585.20 15,063.19 0.00 0.00 0.00 18,500.00 89.30 151.91 7,667.10 -14,096.19 5,632.28 15,162.99 0.00 0.00 0.00 18,600.00 89.30 151.91 7,668.32 -14,184.41 5,679.36 15,262.78 0.00 0.00 0.00 18,700.00 89.30 151.91 7,669.53 -14,272.62 5,726.44 15,362.57 0.00 0.00 0.00 18,800.00 89.30 151.91 7,670.75 -14,360.84 5,773.52 15,462.37 0.00 0.00 0.00 18,900.00 89.30 151.91 7,671.96 -14,449.05 5,820.60 15,562.16 0.00 0.00 0.00 19,000.00 89.30 151.91 7,673.18 -14,537.27 5,867.68 15,661.96 0.00 0.00 0.00 19,100.00 89.30 151.91 7,674.39 -14,625.48 5,914.76 15,761.75 0.00 0.00 0.00 19,200.00 89.30 151.91 7,675.60 -14,713.70 5,961.84 15,861.54 0.00 0.00 0.00 19,300.00 89.30 151.91 7,676.82 -14,801.91 6,008.92 15,961.34 0.00 0.00 0.00 19,400.00 89.30 151.91 7,678.03 -14,890.13 6,056.00 16,061.13 0.00 0.00 0.00 19,500.00 89.30 151.91 7,679.25 -14,978.35 6,103.08 16,160.92 0.00 0.00 0.00 19,600.00 89.30 151.91 7,680.46 -15,066.56 6,150.16 16,260.72 0.00 0.00 0.00 19,700.00 89.30 151.91 7,681.68 -15,154.78 6,197.24 16,360.51 0.00 0.00 0.00 19,800.00 89.30 151.91 7,682.89 -15,242.99 6,244.32 16,460.30 0.00 0.00 0.00 19,900.00 89.30 151.91 7,684.10 -15,331.21 6,291.40 16,560.10 0.00 0.00 0.00 20,000.00 89.30 151.91 7,685.32 -15,419.42 6,338.48 16,659.89 0.00 0.00 0.00 20,100.00 89.30 151.91 7,686.53 -15,507.64 6,385.56 16,759.69 0.00 0.00 0.00 20,200.00 89.30 151.91 7,687.75 -15,595.86 6,432.64 16,859.48 0.00 0.00 0.00 20,300.00 89.30 151.91 7,688.96 -15,684.07 6,479.72 16,959.27 0.00 0.00 0.00 20,400.00 89.30 151.91 7,690.18 -15,772.29 6,526.80 17,059.07 0.00 0.00 0.00 20,500.00 89.30 151.91 7,691.39 -15,860.50 6,573.88 17,158.86 0.00 0.00 0.00 20,600.00 89.30 151.91 7,692.60 -15,948.72 6,620.96 17,258.65 0.00 0.00 0.00 20,700.00 89.30 151.91 7,693.82 -16,036.93 6,668.04 17,358.45 0.00 0.00 0.00 20,800.00 89.30 151.91 7,695.03 -16,125.15 6,715.12 17,458.24 0.00 0.00 0.00 20,900.00 89.30 151.91 7,696.25 -16,213.36 6,762.20 17,558.03 0.00 0.00 0.00 21,000.00 89.30 151.91 7,697.46 -16,301.58 6,809.28 17,657.83 0.00 0.00 0.00 21,100.00 89.30 151.91 7,698.68 -16,389.80 6,856.36 17,757.62 0.00 0.00 0.00 21,200.00 89.30 151.91 7,699.89 -16,478.01 6,903.44 17,857.42 0.00 0.00 0.00 21,300.00 89.30 151.91 7,701.11 -16,566.23 6,950.52 17,957.21 0.00 0.00 0.00 21,400.00 89.30 151.91 7,702.32 -16,654.44 6,997.60 18,057.00 0.00 0.00 0.00 21,500.00 89.30 151.91 7,703.53 -16,742.66 7,044.68 18,156.80 0.00 0.00 0.00 21,600.00 89.30 151.91 7,704.75 -16,830.87 7,091.76 18,256.59 0.00 0.00 0.00 21,700.00 89.30 151.91 7,705.96 -16,919.09 7,138.84 18,356.38 0.00 0.00 0.00 21,800.00 89.30 151.91 7,707.18 -17,007.31 7,185.92 18,456.18 0.00 0.00 0.00 21,900.00 89.30 151.91 7,708.39 -17,095.52 7,233.00 18,555.97 0.00 0.00 0.00 22,000.00 89.30 151.91 7,709.61 -17,183.74 7,280.08 18,655.77 0.00 0.00 0.00 22,100.00 89.30 151.91 7,710.82 -17,271.95 7,327.16 18,755,56 0.00 0.00 0.00 22,200.00 89.30 151.91 7,712.03 -17,360.17 7,374.24 18,855.35 0.00 0.00 0.00 22,300.00 89.30 151.91 7,713.25 -17,448.38 7,421.32 16,955.15 0.00 0.00 0.00 22,400.00 89.30 151.91 7,714.46 -17,536.60 7,468.40 19,054.94 0.00 0.00 0.00 22,500.00 89.30 151,91 7,715.68 -17,624.82 7,515.48 19,154.73 0.00 0.00 0.00 22,600.00 89.30 151.91 7,716.89 -17,713.03 7,562.56 19,254.53 0.00 0.00 0.00 22,700.00 89.30 151.91 7,718.11 -17,801.25 7,609.64 19,354.32 0.00 0.00 0.00 22,800.00 89.30 151.91 7,719.32 -17,889.46 7,656.72 19,454.11 0.00 0.00 0.00 22,900.00 89.30 151.91 7,720.53 -17,977.68 7,703.80 19,553.91 0.00 0.00 0.00 23,000.00 89.30 151.91 7,721.75 -18,065.89 7,750.88 19,653.70 0.00 0.00 0.00 23,100.00 89.30 151.91 7,722.96 -18,154.11 7,797.96 19,753.50 0.00 0.00 0.00 23,200.00 89.30 151.91 7,724.18 -18,242.32 7,845.04 19,853.29 0.00 0.00 0.00 23,300.00 89.30 151.91 7,725.39 -18,330.54 7,892.12 19,953.08 0.00 0.00 0.00 23,400.00 89.30 151.91 7,726.61 -18,418.76 7,939.20 20,052.88 0.00 0.00 0.00 23,500.00 89.30 151.91 7,727.82 -18,506.97 7,986.28 20,152.67 0.00 0.00 0.00 23,600.00 89.30 151.91 7,729.03 -18,595.19 8,033.36 20,252.46 0.00 0.00 0.00 7/25/2019 12:07.,33PM Page 5 COMPASS 5000.14 Build 85H ConocoPhillips ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Co-ordinate Reference: Well Plan: CD5-26 (11 C) - Slot 26 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Plan D25 @ 74.50usft (D25) Project: Western North Slope MD Reference: Plan 025 @ 74.50usft (D25) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-26 (11 C) Survey Calculation Method: Minimum Curvature Wellbore: CD5-261-1 Design: CD5-261-1 wp07 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/ -S +E/ -W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°I100usft) (°/100usft) (°/100usft) 23,700.00 89.30 151.91 7,730.25 -18,683.40 8,080.44 20,352.26 0.00 0.00 0.00 23,800.00 89.30 151.91 7,731.46 -18,771.62 8,127.52 20,452.05 0.00 0.00 0.00 23,900.00 89.30 151.91 7,732.68 -18,859.83 8,174.60 20,551.84 0.00 0.00 0.00 24,000.00 89.30 151.91 7,733.89 -18,948.05 8,221.68 20,651.64 0.00 0.00 0.00 24,100.00 89.30 151.91 7,735.11 -19,036.27 8,268.76 20,751.43 0.00 0.00 0.00 24,200.00 89.30 151.91 7,736.32 -19,124.48 8,315.84 20,851.23 0.00 0.00 0.00 24,300.00 89.30 151.91 7,737.54 -19,212.70 8,362.92 20,951.02 0.00 0.00 0.00 24,400.00 89.30 151.91 7,738.75 -19,300.91 8,410.00 21,050.81 0.00 0.00 0.00 24,500.00 89.30 151.91 7,739.96 -19,389.13 8,457.08 21,150.61 0.00 0.00 0.00 24,600.00 89.30 151.91 7,741.18 -19,477.34 8,504.16 21,250.40 0.00 0.00 0.00 24,700.00 89.30 151.91 7,742.39 -19,565.56 8,551.24 21,350.19 0.00 0.00 0.00 24,800.00 89.30 151.91 7,743.61 -19,653.77 8,598.32 21,449.99 0.00 0.00 0.00 24,900.00 89.30 151.91 7,744.82 -19,741.99 8,645.40 21,549.78 0.00 0.00 0.00 25,000.00 89.30 151.91 7,746.04 -19,830.21 8,692.48 21,649.57 0.00 0.00 0.00 25,100.00 89.30 151.91 7,747.25 -19,918.42 8,739.56 21,749.37 0.00 0.00 0.00 25,200.00 89.30 151.91 7,748.46 -20,006.64 8,786.64 21,849.16 0.00 0.00 0.00 25,300.00 89.30 151.91 7,749.68 -20,094.85 8,833.72 21,948.96 0.00 0.00 0.00 25,400.00 89.30 151.91 7,750.89 -20,183.07 8,880.80 22,048.75 0.00 0.00 0.00 25,500.00 89.30 151.91 7,752.11 -20,271.28 8,927.88 22,148.54 0.00 0.00 0.00 25,600.00 89.30 151.91 7,753.32 -20,359.50 8,974.96 22,248.34 0.00 0.00 0.00 25,700.00 89.30 151.91 7,754.54 -20,447.72 9,022.04 22,348.13 0.00 0.00 0.00 25,800.00 89.30 151.91 7,755.75 -20,535.93 9,069.12 22,447.92 0.00 0.00 0.00 25,900.00 89.30 151.91 7,756.96 -20,624.15 9,116.20 22,547.72 0.00 0.00 0.00 26,000.00 89.30 151.91 7,758.18 -20,712.36 9,163.28 22,647.51 0.00 0.00 0.00 26,100.00 89.30 151.91 7,759.39 -20,800.58 9,210.36 22,747.30 0.00 0.00 0.00 26,200.00 89.30 151.91 7,760.61 -20,888.79 9,257.44 22,847.10 0.00 0.00 0.00 26,300.00 89.30 151.91 7,761.82 -20,977.01 9,304.52 22,946.89 0.00 0.00 0.00 26,400.00 89.30 151.91 7,763.04 -21,065.22 9,351.60 23,046.69 0.00 0.00 0.00 26,500.00 89.30 151.91 7,764.25 -21,153.44 9,398.68 23,146.48 0.00 0.00 0.00 26,600.00 89.30 151.91 7,765.46 -21,241.66 9,445.76 23,246.27 0.00 0.00 0.00 26,700.00 89.30 151.91 7,766.68 -21,329.87 9,492.84 23,346.07 0.00 0.00 0.00 26,800.00 89.30 151.91 7,767.89 -21,418.09 9,539.92 23,445.86 0.00 0.00 0.00 26,900.00 89.30 151.91 7,769.11 -21,506.30 9,587.00 23,545.65 0.00 0.00 0.00 27,000.00 89.30 151.91 7,770.32 -21,594.52 9,634.08 23,645.45 0.00 0.00 0.00 27,100.00 89.30 151.91 7,771.54 -21,682.73 9,681.16 23,745.24 0.00 0.00 0.00 27,200.00 89.30 151.91 7,772.75 -21,770.95 9,728.24 23,845.03 0.00 0.00 0.00 27,300.00 89.30 151.91 7,773.97 -21,859.17 9,775.32 23,944.83 0.00 0.00 0.00 27,400.00 89.30 151.91 7,775.18 -21,947.38 9,822.40 24,044.62 0.00 0.00 0.00 27,500.00 89.30 151.91 7,776.39 -22,035.60 9,869.48 24,144.42 0.00 0.00 0.00 27,600.00 89.30 151.91 7,777.61 -22,123.81 9,916.56 24,244.21 0.00 0.00 0.00 27,700.00 89.30 151.91 7,778.82 -22,212.03 9,963.64 24,344.00 0.00 0.00 0.00 27,800.00 89.30 151.91 7,780.04 -22,300.24 10,010.72 24,443.80 0.00 0.00 0.00 27,900.00 89.30 151.91 7,781.25 -22,388.46 10,057.80 24,543.59 0.00 0.00 0.00 28,000.00 89.30 151.91 7,782.47 -22,476.68 10,104.88 24,643.38 0.00 0.00 0.00 28,100.00 89.30 151.91 7,783.68 -22,564.89 10,151.96 24,743.18 0.00 0.00 0.00 28,200.00 89.30 151.91 7,784.89 -22,653.11 10,199.04 24,842.97 0.00 0.00 0.00 28,300.00 89.30 151.91 7,786.11 -22,741.32 10,246.12 24,942.77 0.00 0.00 0.00 28,400.00 89.30 151.91 7,787.32 -22,829.54 10,293.20 25,042.56 0.00 0.00 0.00 28,500.00 89.30 151.91 7,788.54 -22,917.75 10,340.28 25,142.35 0.00 0.00 0.00 28,600.00 89.30 151.91 7,789.75 -23,005.97 10,387.36 25,242.15 0.00 0.00 0.00 28,700.00 89.30 151.91 7,790.97 -23,094.18 10,434.44 25,341.94 0.00 0.00 0.00 28,800.00 89.30 151.91 7,792.18 -23,182.40 10,481.52 25,441.73 0.00 0.00 0.00 28,900.00 89.30 151.91 7,793.39 -23,270.62 10,528.60 25,541.53 0.00 0.00 0.00 29,000.00 89.30 151.91 7,794.61 -23,358.83 10,575.68 25,641.32 0.00 0.00 0.00 7/25/2019 12:0733PM Page 6 COMPASS 5000.14 Build 85H ConocoPsphilli ConocoPhillips Standard Proposal Report Database: EDT 14 Alaska Production Local Coordinate Reference: Well Plan: CD5-26 (11C) - Slot 26 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Plan D25 @ 74.50usft (D25) Project: Western North Slope MD Reference: Plan D25 @ 74.50usft (D25) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-26 (11 C) Survey Calculation Method: Minimum Curvature Wellbore: CD5-261_1 Design: CD5-26L1 wp07 Planned Survey Measured Vertical Vertical Dogleg Build Tum Depth Inclination Azimuth Depth +N/ -S +E/ -W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°/100usft) (°/100usft) (°/100usft) 29,100.00 89.30 151.91 7,795.82 -23,447.05 10,622.76 25,741.11 0.00 0.00 0.00 29,200.00 89.30 151.91 7,797.04 -23,535.26 10,669.84 25,840.91 0.00 0.00 0.00 29,300.00 89.30 151.91 7,798.25 -23,623.48 10,716.92 25,940.70 0.00 0.00 0.00 29,400.00 89.30 151.91 7,799.47 -23,711.69 10,764.00 26,040.50 0.00 0.00 0.00 29,500.00 89.30 151.91 7,800.68 -23,799.91 10,811.08 26,140.29 0.00 0.00 0.00 29,600.00 89.30 151.91 7,801.89 -23,888.13 10,858.16 26,240.08 0.00 0.00 0.00 29,700.00 89.30 151.91 7,803.11 -23,976.34 10,905.24 26,339.88 0.00 0.00 0.00 29,800.00 89.30 151.91 7,804.32 -24,064.56 10,952.32 26,439.67 0.00 0.00 0.00 29,814.56 89.30 151.91 7,804.50 -24,077.40 10,959.17 26,454.20 0.00 0.00 0.00 TD: 29814.56' MD, 7804.5' TVD - 4-1/2 x 63/4 [Design Targets Target Name hit/miss target Dip Angle Dip Dir. TVD +WS +E/ -W Shape (°) (°) (usft) (usft) (usft) CD5-261_1 Tgt 01 0.00 0.00 7,622.50 -10,633.29 3,783.25 - plan hits target center -Circle (radius 100.00) CD5-261_1 Tgt 02 0.00 0.00 7,804.50 -24,077.40 10,959.17 - plan hits target center -Circle (radius 100.00) Casing Points Measured Vertical Casing Hole Depth Depth Diameter Diameter (usft) (usft) Name (in) (in) 2,335.52 2,264.00 10-3/4 x 13-1/2 10.750 13.500 14,351.00 7,617.84 7-5/8 x 9-7/8 7.625 9.875 29,814.56 7,804.50 4-1/2 x 6-3/4 4.500 6.750 Plan Annotations Measured Vertical Local Coordinates Depth Depth +WS +E/.W (usft) (usft) (usft) (usft) Comment 14,350.00 7,617.75 -10,435.52 3,678.33 KOP: 16°/100' DLS, 25° TF, for 13' 14,363.00 7,618.88 -10,447.00 3,684.32 Hold for 20' 14,383.00 7,620.28 -10,464.76 3,693.42 Start 4°/100' DLS, -15.73° TF, for 134.25' 14,517.25 7,623.64 -10,583.39 3,756.07 Hold for 56.84' 14,574.09 7,622.50 -10,633.29 3,783.25 Start 1°/100' DLS, 165.39° TF, for 190.67' 14,764.76 7,621.75 -10,801.12 3,873.72 Hold for 15049.81' 29,814.56 7,804.50 -24,077.40 10,959.17 TD: 29814.56' MD, 7804.5' TVD 7252019 12:07 33PM Page 7 COMPASS 5000.14 Build 85H 0 N m 0 Z o 0 c C wC N + v O ma y � U m m m a m w A Y � m U m r E _ Q LO E c ^ ^ C m � R V n v m a m o � A S p W •N ^ A ii ilk v h A ii �% E a •x N u�i � m O t o O .� a L V E a n 0 V D� NCL x E o O z cLb x O L o Z� t"! N m ^ E'�-� U o� ,V N m o i.. Q N L j N �i >+ m m c v u p N Lo C LCA � in p _ ' v Cc `o V if S V V Q E° c°� N � C' D M m C7 0 N a O U a z o 3 OI o -r o z E E 3 N C � a N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N (0 (0 (0 N N N N N N N N N N N l9 (0 N N N N N N (0 (0 (6 t0 (0 N N N N N (0 (6 (0 (0 (0 N N N N f0 f0 l0 f6 a L IL LL n. LL a LL a LL LL a a LL LL CL CL a a a s a LL a a a s o_ 0 v O 0 U m E U U m m O O U 0 ED E C N C N N N C N C m M M C N G m f6 N f0 C f0 l0 O G C _ C 2 LL B LL LL LL A LL f6 LL � LL N U- LL r0 LL LL ��„ lLL LLL i N N N O m p U 0 U U m N m m N m m U 0 U 0 U y N m m 0 0 0 U m N N N N U 0 U U Mn m m 0 0 0 0 E E C C C rn <n C C C <n C C (n C C G C C E °@° T T L° ° a L° m N L° ° 1° ° H L° T m ti L° T E 10 T O C @ c N m c CL 0 C d M c w c a m N c O. N m c c m N (n m a� m m m m m m m m m_ m m m m m m U U U U U U U W U U W U U U U W U U U W U U U U U U (o (o wo wo N O wo N O Co O No V mo O M (o mD to � M M m V (A r in r fo (o (o O (o M O O M O O O OD OD r` O [D n I� O (o (o (o V M O O m r O r` O r` r CM M N N w M O M O CD CJ w 6 m r` V e- M m .. � O m m m LL U 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (ci o (ri 0 0 0 0 0 o cd (ri (ri n 0 0 0 0 0 ui o 0 o ui 0 0 0 0 � 0 0 0 O L 0 0 0 0 (o O (o O M N N 1� N N M 10 00 O (o -c O N N r r N (o r- O M u7 O (O 1� CO M h r` O O M O M m r N m❑� .- N r N N N r r r r r r N M r r N N r r r r M M O a O a N N M� n (n a O M m a M M m (O M C N N N N M 7 M N N O V I� O M (l O R I� (p m 0 (C Om O O N N N N N N M m D. W (o M (( o co a 7 (D (D (o (D (o (o O T O I� R 7 r` r •- m` W m (V (V (V (V (V cV (V (V (V (V N N r r r (V (V (V (V N N I� O n O M O n O a n O a ((') r` N m m O O M N 7 'O O OD O (n OJ 0 w 0 to (n M M M M M M (O M w M M W M M (� (o (O M N O N N (o O (O CD r (O (o (o v O M (p M N M to a N O L (q G :C O O ([1 r (f1 n N (tD L( (o O R (O O N n � m (n � W M O (o (A M CO m� r N u7 O O (o O r r M cc M O (o CD D m m T Oi C2 O N �- N r N N N (o (o (o (O (o (o N r r r .- r (� to u'i m N(o N O a O N r r r r r N N ❑ .� CL O O (o O r (n O r N u7 (D 7 (O O O (O f� O m O r M r o E m o of o 0 0 0 of ri ci ri ci m o 0 o a ro o of of n o w JO C R D V o O W n n r r r r M 7 O J O N M rn N r O (o E m o 0 0 C C M M M C r r r r r r M M M M M 2 r m rn w v v 0 N fr (p 0 C O C7 C'i M C7 N N N (V r (V U Q J U 0 ry O. r O ti O O O n O V (o 't n n N m m O O M N 7 O o N m N •O (D O m O (n N M M M M M M M (l O M M O (o m r u7 M (o M N 1 m❑ V L L 'N d p m (o w (o t0 (O M w m M m M It �-D � R N O N N 0 M M M r 0 0 V O r m.: n (O V N 10 m �► C � (O Ll O (D ONi m U m n 0❑ '•• O N O N N N M O M M M O N N M O ¢f �� O O� � A N N N r L L'o X co p N U Z v «� E i ❑ o /��/� ' 0 0 0 0 0 IL 2 a m E 3 3 3 L o ' m Vp a m m 0- a m m m m N N N N O Z m N �O C a m J J J J J J M M M 0 0❑❑❑ C yl O a N N N N N N �... �.. r M M M U U U U U 3 v C v x 0 0 0 0 0 0 uJ 0 0 0 0 N N m� O �CLu O a) m 3 N N U U U U U U N N N M M U U U N N N N N 0 O CL C W ' IQ N N N N to N N ❑ ❑ ❑ U CD ECL"U E 0-- -000' mmmmmm oo mmm ❑ ❑ UUUUU (� N o m U U U U 0- d. d a_ D_ LL U U CL °i O a ❑ = ' J J J J J J J J J J J (O (O M rai rai A (n M M M M M U U U U (O N N M ❑ r 3 ' d C) N N N •y = 7 CO C ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ U U U U U N N N N N 00 O m CL UUUUU UUUUUUU L) C) U CUU, C, C, rn L C3 m N E Q M M M ❑❑❑❑❑ U 0 C O) = p• N N N N N N N N N N N N N N N N N M M M M M U U U U U U V m T G K C « E O ([) (n ([) ❑ ❑ ❑ ❑ ❑ (C) (A ([J (n ([) (A ❑ ❑ ❑ ❑ ❑ ❑ ❑ 6 A (t5 A ❑ ❑ ❑ ❑ ❑ 6 A (n � 0 ❑ ❑ ❑ ❑ ❑ C C C C C m m m m m rn �+ V U LL d d d d LL' C C amm a O U a 1� u 0 y 0 > > 0 7 2 2 2 2 0 0 0 o m 0 0 0 o v N M r N aD N ;t r �2 N 0 0 0 0 0 m o 0 0 0 0 0 0 0 0 Q� Ncnnr -� LL N ;i ;E 14 U) co a U O co rn E 0 CL c O v W E m E E E U) U) 0 c o m IL U 9 A O. � m G C m C m A r CL m m w o. m fq � n m O r 3 0 r o E m co E m N o m � cwg 'o LO o` y Q J O Yr cmi m co L N U p Y 0�♦ � � c c V T N m CL a m m i o E Z w c a m c L m m N C d m m O U S B 3 CP m CL 0 0 ,W E G N U m U U Li x 8 v m rn rn O N o Z = r U o E m U U U7 = a a Arm, 0 rn rn ? m ° d to m m c O1 E Z a U U m T C am. p Oi rn C C Qm m 1LO- K fq iq 0 y 0 > > 0 7 2 2 2 2 0 0 0 o m 0 0 0 o v N M r N aD N ;t r �2 N 0 0 0 0 0 m o 0 0 0 0 0 0 0 0 Q� Ncnnr -� LL N ;i ;E 14 U) co a U O co a� W 0 m 0 z C 0 L V N in a ym m � w K N O U ti ' U a O ■- ■- � R 0 lL dR ^ C � on-Cj A m ° i :E CL N d a 0'+ r o Ka `� wm�.n� V Oy N r' 0 m Z J J \+ O L o o z .� nmo7ii� o�„ d Q U to N X CO CD N �� !+ m m e ci L ' M a m e vn W O Nl Lo C Ln CD L(i 0 w�+ ' m U z z o V V if V U U Q E ' m m° L L) LLS N t= z 0 wvi c� a a N fA 0 CL s 0 0 c 0 U Y Q CL 3 T J N Lh 0 U V T T N 0 U a L Q w. AQA W N C Q E c 0 N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N m m a m m to m m m to m m to m m m to m A m m to to w m to a o_ a s s a s o_ o_ a n a LL a a o_ a n. a a a a a d a d a c c° ° c c c c c c c d° o mo da v� o v w c m c m a m m f0 N LL (0 t0 11 t6 f0 lL f6 N LL m N LL l0 f5 LL N N lL N (6 LL l6 f6 LL t6 N N U N N U N N N U N N y N y N y N y N ❑ U c❑ U c ❑ U c❑ U c ❑ U c❑ fA c ❑ N c❑ U c O N c❑ Uc W U c c d d d moc a cn na dU —nd U W U U W U U w U U W U cv W U U w U U w U U w U U M M ,O O t0 4 r O N M f0 O N 0 r V tD O M (0 O M fA M M M N C O O M O O N OI to O V a0 M� m r O O O O O 'O 0 O 'O W r V W 'O CO O V 0 R r r 0 r O 0 N W O W r 'Ow w N M t0 It V a N N N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 vi 0 0 0 N N 0 O 0 0 0 0 0 o N O o o ,ri O o ui o C 0 0 of o r O O u] r r '0 O ,0 O O u') r ,O r N h N ,O N ,O O ,O W O '0 N d' M V '0 � 7 '0 � O '0. N O N N O O)(11 O O) co co N M 0 r V 0 N O t0 OO m M M N M r to N CT N V M r 'O M M r O O (O (O O (fJ (O O O M O O M M tD t0 W O N N N O N M D1 V r r 'O r r V r r 'Q 10 N (D 10 to f0 f0 m O) (b (0 m — 'O N N M N N M � � O � O � � O) � 0I � � O M M N N N M 01 N to O M O M O M M O m '0 O ro N t0 N M O N tD to O r O N N O N N N N N O1 O) N O M t0 V N O M M 6 M 0 't') w o v o t0 t0 t0 r r N .- .- N 0 m r M 'O m v r c v r v r O a r O R y r y r h M Vt0 t0'O W O fP y r N N N Cl! r M r W O r O O V O C (O M M fif O W r m O N W W N W M r to m r tP W r W M r M M N (O m rn v r r to r r r r r r 'n 'n m 'n 'o m rn rn o rn rn o c6 M c6 M M M tr N O) m M O M O M 'O t0 tD � t0 N t0 N t0 to N O W O r (p N N W N N r N N r N W O N ma! r 'O t0 R N O of N m a 0 r V a 'n a 'n N t0 m N 0 m M m o7 M m M m m 'A m r O r 'O r- It 'O O '0 h O '0 N r 0 'O r O) M N M 01 O R N V M t0 O C 'O O N u M 'O O M M M— m O r t0 r O tp j N r G t LA tom c ❑ _ i t0 a u a `o d i o �14, A E z • a d " d d J J J J J J J J J J tp d N N N r r r u7 'C) u; t2 m m 'n 'n h tP O W N 'f1 C N N ❑ ❑ ❑❑ O '0 ) (% ❑ in 0' ❑ ❑ ❑ ❑ ❑ ❑ O N 0 UG ❑❑ ❑ d Z N ❑ ❑ ❑ U U U U U U U U , , , U U U U , U U U , U U U • Q N ' ' ' ' ' ' ' ' ' J J J ' ' ' J J J ' ' ' J J J ' ' ' J U EN N N N r r r r r r M O O c0 O N O) O O— Of 01 N N N N .. 3 a) L6 LA�L6�A6 L—�6 A� L 66 60A i oc c L6L6L66 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ • 'N o m d y •a U U U U U U U U U U U U U U U U U U U U U U U U U U U U d N :RN 70 d0 5 . r r r N N r r r r r r W O M M O O O) O O) O) O O) N N N N G N h m • d R A M M d E '•' p D t!1 'q '() ❑ ❑ ❑ ❑ ❑ ❑ '[) '[] '!) '() '[) '[) ❑ ❑ ❑ ❑ ❑ ❑ tt) '(] tf) 'O '() ❑ O ❑ ❑ ❑ O 'n 'i) '() 'n '() '() ❑ ❑ ❑ ❑ ❑ ❑ '() 'n 'n ❑ ❑ ❑ ❑ c c (n U V U U U U U U U U U U U U U U U U U U U U U U U U U U U U d c0) v x 0) 0) CD O N `1; 3 0 a N N N N N N N N N N N N N N N N y N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m a n. a a a a a a a a a a a a a a a d a a a a a a o_ a a a a 0- 0 O a c c c c c c c c c c 4 o2 m E m C m C m C m C m C m C m C m C m C m C 2, •C a IL _m a W m a W Y6 a LL _m a LL CO CO LL Co Co LL _m a LL _m m W _m m LL m NC CI N N N Cl N N N _N C) y N N N N N _1 w N w _N N _N , N E U) G❑ C ❑ C❑ C ❑ C❑ C ❑ C❑ C ❑ C❑ C ❑ CI m N 0 N `1 N N N C) l0 `) N m N QI m `1 0 m N N m m N 1`6 `1 0 m `1 a@ c a m a m a m c n c n m c a c n (o c a m a (� c N = N N N C) = Ol m= m C) e m N= N e m Cl N N C N al = W Ol W U U W U U W U U W U U W U U W U U W U U W U U W U U W U U (0 M d _ V N N N T t0 M (O (0 M O t0 O (!1 t0 O (0 (0 O m (0 0 m (0 0 (0 r N r O C r m N m N a0 V aD W V' a0 0; cD W V a0 N N a0 W (n � O N � d �- 4) A LL U 0 o a o 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 a C o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O i0 O (0 O O (0 (0 O N i0 O 0 (0 0 (0 (0 ,= O N N r r (0 r (O N (0 O r N O r N 0 r N r N r N N r N r y Q r (0 r r m r r ct N 0 r G m r at c0 r M O r M (O r N (0 r N (O y d N N N N N N N � O m O w(0 N V N O m N O (0 V O (0 N (0 N C N M m W W M (0 Cl '• m m r m r m r N m r <V m r W O m M N y 0 N 0 N N m (0 t0 (0 (O N N (0 N N (0 N N r N N r N N O M N m N M10 M M O M M O r 6 Q V N N N N N W N N N V r W W M 0 r N 0 V O O V O O V O 0 V O (0 V O M V O O O a V (0 O (i m m N V N (0 N OR O W CO O r 4] (0 O ' (0 N L O M QD W (O r (0 N (0 O r N m r N m r N r N r N M r N CO N m r r ct w O r r 0 r r 0 r N 0 r N (0 r N 0 r N 0 m N N N N N (V C a 2 CL 3 o M r v m C] Co m o O V m o (n M G r (0 M V M O (D m (0 N V V N V V N V O N O V N V N V P-: N T- O E Cl V7 O r r O 6 w m O O r r M r r M r r m r r m r r r r N O O C O m m 0 r r m (0 (0 (0 M M O M M C M M C M M C M M O] M M m r r N c w of m m of of 0 � � 3 a Q � m U ry d N V r 0 m M 0 r N 0 V 0 0 V 0 0 V O 0 V O (0 V O M V 0 0 O N a V (q O M m m N V N (0 m m O M W O r .- (0 (O O U0 N ( N N d L co (0 m co V M m M w M N W w (0 m m co m m 0 co co m (0 (0 m 6 0 m V O M M M iA r (0 N (0 O r N m r N m r Nr N r N Cl) r N M M C U (C N �• O1 r (0 r r m r r O r r m O r r (0 r r N r N m r N m r N (0 r N 0 U N C N❑` m r m m N N N N r y W N N N N N � � p U Lo m E D c d G ) m R m m m m m 00 z Q CO a Y 0 C) J J J J J J U p V V V V V V O N> N 3 N N N N N N N N ❑❑❑❑❑❑ �� N N N N N N N N N N N N N N N �� 6� U U U U U U N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o U� U U oU o m m m m m m 0 xa (o a U U U UUUUUU UUUUUU a a a LL a LL C a 0 P ? � v O O N N N M MM V V V V V V V V V V V V V (0 Q L U 0 N N N N N .£ N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N a c o 7 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 •N Z 'y O y y U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U -�O O U y E N O O 1 ( N N N M M M V V V V V V V V V V V V V V V V V V (0 O C m m Z C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N (n u� (n (n (n (n (n (n (n (b (n (n (n (n (n .1r U v 0: K " O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑ U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U CO O M m a rA O z o � o o c a c CI F F 0 i.. O tq U) U z WW = c a a o U U) a V� 3 v o0 mm m m N m m N N m m m m N m m m m m m N N N N N m m m m N m N N N m m N m m N m m m N m N N N m N m m m m m N N m m m m m m m m m m m m m m m m m m m m m m m a. m m m m m m m m m Q. CL a a a s a a a a a a a a a a a a a a a a a a a a a a s a s 0 0 0 a N E c c O O � O c c � O o O c c 0 O O O c c O O 0 c c c U m N U d d c@ c d a) c c 10 `6 `,4• e `M c CO E0 .E m c C m m m m M m m m M m m m m m m m m m m m 2, a LL _m a LL N a LL a LL N N a LL a LL N N a LL a LL LL LL a LL a LL N a i� d a) d a1 d m N d d ❑ d d d ❑ d d a) d d d C! d ❑ E E c❑ c aJ m `) d m u) c❑ u) c N w N d d N u) c❑ u) c N d N d d N w c u) c c d N d m m c h c❑ U) c m d m `l d m u) N d 0 coc a a m a@ n cd U) = d d o d dor N d ? a) 2a N dd d_nm@ (u d@ a) 2-nd d) .9- w U U w U U w U U w U U w U U w U w U w U U U W U U W U U w M r r M O O O m m O m r O r m r ,0 m O) M Q N 01 ,n M M r m m m d r m m M N Q) r r M r r M r m r r m r M N 0) Q r u1 Q N N cl m m N m u) m m N m r m N m c 0 M N Q M t�I N m N N m m m Q r r m r c0 r m W Oi r Q oro r r o m M N r r r N N d LL U a 0 o a o o o o o 0 0 a o 0 0 0 0 0 0 0 0 0 0 a a a o a o 0 0 0 0 0 0 0 0 0 0 0 C o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 o 07 o O o o ,ri N o O O O ui O ,[1 to LLJ N ui LL'1 0 o VI 0 0 0 0 o N 3 L y a m O N O O r N m r m O r- r M O r 6 m m m m m r O ,(] N O N r N W m r N r N r O N N ,0 O r 0 0 0 i0 ,0 m m M Q ,0 N (0 r- 0 0 M N r N r r N r r r r r t N M O m o m M M m M r m C aN M M r ,0 M r 0) r O r m 0 M m N m r m O r m M r r ,0 d O N N mN N N O O) r0 m N Q Q N Q Q m m m m O D) M m m m Q r O r O m M m W r r m N M r r M M M N a W d N m O a O r a 0 N r N N N r m O r m N r M O) r M r m m N Q N N m W M Q Q M ,0 Mu0 N m ,0 m ,0 Q N ci m O m r Q Q O CI M O O a y Q Q1 Q Q Q (M 00 m M m Q Q Q r m Q M aJ a] M Q O Qf Q O ,n m m a M m r m m rn m m W r Q O r N m Q) N N N N N N Q Q m r M M m m r m an d r O m r e- N r r N r t- 04 N N N 3 O N O M N Q M O M O m O M m r Ol O r r 0) m O N O Q Q r m 01 m m O r Q r Q r O m M G0 r r r r m rn O N T o E d m of m o v v o v v o r v of ori m m m of of o o 0 0 0 J O r = 0 �' N N N N N m N N Q m m r N N M r r r r Q r Q r r m .- m r N Q r N r Q Q N E N = N VL ❑ LA 0 U N 6 O r 0 0 r m O r m N m m N Q N M 0 M 0 N N O m O O r O O d a N r N (V N r M 0) r ci r N m m C) Q Q m ,0 m t0 Q Q M Q O m M U N U ' L Q m Q Q Q O 01 ,0n O M m m M m Q O r O r 0) Q Q r m Q M O �0 �0 Q O m m N m N m W M Q O o Q Of r M O W O 6 ,0 N N O y O' N r M m r m m M m m m r N m C N N N N N Q v m r M M m to r U d r O m r N r N r r r r r r 01 O N N � p U N Z a Lo 9 E m r ❑� c U U U U U U N 7 Cm N N N M M 2 N L W v o o ami > > > > > AN y m a V N a a a a a a s +� d t a r o 3 3 3 3 3 3 3 L U a m d m E m Z ___ m m m _ m m m N N N N N N N �� •� O V- m C m d LL• a d a a a M M M v v v a d a N ,n ,n ,n N m❑❑❑❑❑ N N ❑❑ o d c ja U a M M M M M M M M M U U U U U U U O m d d J J J M M M {n 1A ,n Q Q Q 6 t0 ,0 m M❑❑ ❑ m m r r r m m N O H m d ,p d m ,0 N N N N t0 ,0 f`� M M❑❑❑ U U U LL] LL� ,n M C7 M� ❑❑❑ U U th U U m a ,n U N N N N N � N N � (i c �0 a v . d N (V ❑ ❑ ❑ ❑ ❑ ❑ U 0 a 0 ❑ ❑ ❑ ,n 0� ifl ❑ ❑ ❑ ❑ ❑ �[] ❑ ❑ E Q E a o U U U U U U m m m U U U X X X U U m m U m U U U U U U U V m U U a s a Q Q Q a a. a rn ? ' ' J J J M M M M M M Q Q Q M�� ,0 ,0 ,0 ,0 m m U U U U U U U N l.1 E d m h N m m N N N N N c M M M M M C? t7 M m m m M M M M M M r r N N N M M O L C C � 'n ,n �n `n `n ,0 to h m m to ❑❑❑ u1 U) ,n u) 0 .r.. .. .r... ter.. �. �. .,w YI � O 0 O O❑ C ❑❑❑❑ O ❑ ❑ ❑ ❑ ❑ ❑ U U U U U U ❑ ❑ ❑ U U U U U U , , i ❑ ❑ O ❑ ❑ U U U U U ❑ m mr r r U N cV N N N m m N N � 7 Z •m o a y U U U U U , , , , X X X , 'o O O d m E t0 „7 m M M M M M M Q Q Q Q Q Q LL1 N m N m ,n ,n ,n �n ,n m❑❑ Q Q❑ m v'� ❑❑ N O a c d 07 ? Z p, N N N N N M th C7 lh M C7 M t+I M M M th M M M t+1 M (+1 U U U U U U U V T v m m 2 E � v n n n Ln A Lh to A L' Lb vh A Ln to L' n L' v Ln � U v Z O iA O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ m m m m m m m m m a _ c c U U U U U U U U U U U U U U U U U U U U U U U U a a a d Q m m H K w 0) Fil •CL i O 0 V Ei O O O O O O O O O O O o 0 0 0 o vi (ri yip •L" S" N V (� a00 M M d j M M O r r m v m o C . 0 Il C Il (U O do V (/ � tN0 rn G 2 w R N W m W O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (ri 0 0 0 (ri o ui o o (ri o Lo ui vi O m m N M u0 0 0 0 N 0 m O 1� c V m O M M m N N r O r C r M N N N m M r CO M ^ M N N M m N O N m 0 M M m N O M O M (A M M M v m M M r (O M fl� O m 0 Il� (p M O M N 00 M m M 7 M V V N I- r m (o to i(I r I- V m n n t[I r U) r ([1 m r mCI M O (U m m M m (A r m r r r r N r r m r M r r N N r r N ( MO m m O O m O O m O O m m m m m 0 m m R m m 0 m m m m m N (D m m 0 0O O m I� � m (fi Oi N N I- m r N N N N It N M N Il O O 7 M O O �2 N N G� M V M O m M O V (fl V' O V V' M M O O M O M M O M m (n m (!I m M r r m r r r r N N N N N N N r ai ( MO M m O O m O O M O O m m m m m 0 v m m v m (n o m m m m m N m m m o 0 D o m I-: m m r M V r m m m m I� M M m N N r m m m m ry ❑ "' c m m m � to � � to � > > > d N ❑ C M 7 V R m m m m m m M M M M M M (/J f/J [n 10 C > > > > > > > > > > > > > � > > > o ❑ O 3 3 3 3 3 3 o 0 0 n n �- c R a v 0 n o 0 0 0 0 0 0 0 0 0 0 0 a n C_ o o N 3 E 3 3 3 3 3 3 3 3 3 3 3 3 3 M M? M? M m m m 3 3 w c (p m M M M N N N M M M (n ((� ((1 (() (A M M M a o z N N N N C? M M M M M M M M N 0 0 0 0❑❑ U U U U U U L] N L6 M M ❑ ❑ ❑ cn �� ❑ ❑ ❑ ❑ ❑ ❑ ❑ (n (n (n M (n ❑ ❑ ❑ ❑ ❑ ❑ ( ( i i i ( ((j (n U U U ❑ ❑ o L U U U U U U U U U U U U U M M M M U U CL O fn N N N M M M NN N N N N N N N N N N N N N N N N N N N N N N N N N N M M M M M M (n (n ([1 N (n u] N N N N N N N (6 (0 f0 (U N (0 N N N N N N N lO l9 f0 l0 (0 N N N N N N a0 l0 (0 (V (0 l0 N N N N N (0 (0 [6 (0 (0 N N N N (0 N N a a L a a s n. a a s a LL a a a a a a LL LL a a a a a a a a a L c 0 ? ' U U U U OO o] 00 v v v m m m m m m >>>>>> =0 fn fn (n fnfn c c c m m (n n v N N a c c c c 3 c c c C 7 [f (!] (!] (A M M M M M M A 7 m E U U U U V N C t6 C U N U U U C (6 C U U U U C C U U U U C C U U U U C C LL N LL f6 LL N @ LL N LL L N N t0 N LL t6 N LL N (p (d LL �(�, LL (p (p (p N LL LL LL A rL NN N N U ❑ ❑ U N d N U ❑ U❑ U N d N N ❑ U❑ U N d N y p U p U N d p U C UJ !n C C (0 d d l0 2 N 10 U U C C d d N N d N to y C C N W W N (D N C C N d (`6 C C C C (6 n c n c c a c a@ c n c n (a c c m d' d N d N_ d d= -C, d d e N N= N d= N d= N d W N d d N a a a R U U W U U w U U w U U w U U w U U w U U W U U U U U U U M O m (A M M m m O M I- m (n M m N N M M N Lo N (O N M m (dj M M N N M M M m (n M N1-: M m V M O m h V V: M a f* N M m (n N M N � R m N m m m o m m a (D m O N Cl m It m M N Cl M M L2 N (p r N LL V O O O O O O O O O O O o 0 0 0 o vi (ri yip •L" S" N V (� a00 M M d j M M O r r m v m o C . 0 Il C Il (U O do V (/ � tN0 rn G 2 w R N W m W O O O O O O O O O O O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (ri 0 0 0 (ri o ui o o (ri o Lo ui vi O m m N M u0 0 0 0 N 0 m O 1� c V m O M M m N N r O r C r M N N N m M r CO M ^ M N N M m N O N m 0 M M m N O M O M (A M M M v m M M r (O M fl� O m 0 Il� (p M O M N 00 M m M 7 M V V N I- r m (o to i(I r I- V m n n t[I r U) r ([1 m r mCI M O (U m m M m (A r m r r r r N r r m r M r r N N r r N ( MO m m O O m O O m O O m m m m m 0 m m R m m 0 m m m m m N (D m m 0 0O O m I� � m (fi Oi N N I- m r N N N N It N M N Il O O 7 M O O �2 N N G� M V M O m M O V (fl V' O V V' M M O O M O M M O M m (n m (!I m M r r m r r r r N N N N N N N r ai ( MO M m O O m O O M O O m m m m m 0 v m m v m (n o m m m m m N m m m o 0 D o m I-: m m r M V r m m m m I� M M m N N r m m m m ry ❑ "' c m m m � to � � to � > > > d N ❑ C M 7 V R m m m m m m M M M M M M (/J f/J [n 10 > > > > > > > > > > > > > > > > > > > a a a a a a > > > O O M > ❑ O 3 3 3 3 3 3 o 0 0 n n �- c R a v 0 n o 0 0 0 0 0 0 0 0 0 0 0 a n o o r o ` a E 3 3 3 3 3 3 3 3 3 3 3 3 3 M M? M? M m m m 3 3 3 J 7 (p m M M M N N N M M M (n ((� ((1 (() (A M M M U a N z N N N N C? M M M M M M M M N 0 0 0 0❑❑ U U U U U U L] N L6 M M ❑ ❑ ❑ O M O d d ❑ ❑ ❑ ❑ ❑ ❑ ❑ (n (n (n M (n ❑ ❑ ❑ ❑ ❑ ❑ ( ( i i i ( ((j (n U U U ❑ ❑ (n U U ❑ L U U U U U U U U U U U U U M M M M U U ( U m CN] M N N N M M M M M O O O O N C N N N N M M M (n (n ((1 (A ([5 (h u] M M M M M M (n (n ([1 N (n u] 0 0 0 0❑❑ U U U U U U ([J m m M M ❑ ❑ ❑ ((1 � M M M (A (A ❑ U U U U U U ? ' U U U U OO o] 00 v v v m m m m m m >>>>>> =0 fn fn (n fnfn c c c m m (n n v N N m 00 Q (n N N m❑ U p z OI O 7 m M M M N N N N M M M N N N M M M M M M M M M C 7 [f (!] (!] (A M M M M M M N m m 0 0 M M M M m O O N m M M m d m 4] (n (n (n N N 4J N ((J (n N (n (n N (n ([] 4] N M a❑ a z a U U U U U U U U U U U U U U U U U U U U U U U U U U U U C m m m m m m m m m m m m m m m m m m m m m m m m m m m m y a d a a a a a a a a a s a a a a a a a a a a a a a a a R @ d U U F d' In N m 0 h Q a 3 J m N L 0 V r �r CD N L V CL s- o o 4- L O CL W O .N V .I.d ai a A U U (n � Z g 0 0 z cn U LL z LL o + 5S����C:l cD2m:5 :�i20 0 o O o co 0 0 0 o v 0 0 0 o v a 0 U Z 0 0 m CT m 30 0 Q20 as U) a� c m U 0 aD X10 a� U CD5-26Li wp07 Ladder View 15000 17500 20000 22500 25000 27500 30001 Measured Depth m 230 C 14400 14550 14700 14850 15000 Partial Measured Depth SURVEY PROGRAM CASING DETAILS From Depth To Survey/Plan Tool T D MD Nam 40.80 2200.00 CD5-26 wp07 (CD5-26) GYD-GC-SS 7617.84 14351.00 7-5/8 x 9-7/8 2200.0014350.00 CD5-26 wp07 (CD5-26) MWD+IFR2+SAG+MS 7804.50 29814.56 4-1/2 x 6-3/4 14350.00 14750.00 CD5-26L1 wp07 (CD5-26L1) MWD-INC_ONLY (INC>10°) 14750.00 16250.00 CD5-261-1 wp07 (CD5-26L1) MWD OWSG 14750.00 29814.46 CD5-261-1 wp07 (CD5-26L1) MWD+IFR2+SAG+MS m 230 C 14400 14550 14700 14850 15000 Partial Measured Depth { W CL V / ■O �i Q n o ■ rn 3 ■ T �1 T 0 p Ln Co N o co N _ � p a U N � T C. CO r rp p U Ua 3 Cl)c� C � p O _ J J N CL 3 Cl) 1� U p p m p U N p U Q N C� N co N .�- ■ p �09 S M p CD o ,,^^ LO � 3 > M ■. V s �s C T c c p U Q rn U Cl) U) w U o QC? ,6 U p Q U ti L � X a C LO p U T N �..� N LO V 0 N N 7. m (uiMsn 0009) bul4UoN 13:02, July 25 2019 CD5-26Li wp07 TC View SURVEY PROGRAM SECTION DETAILS From To Tool MD Inc Azi TVD Dleg TFace Target Annotation 40.80 2200.00 GYD-GC-SS 14350.00 84.09 152.00 7617.75 0.00 0.00 KOP: 16%100' DLS, 25°TF, for 13' 2200.00 14350.00 MWD+IFR2+SAG+MS 14363.00 85.98 152.89 7618.88 16.00 25.00 Hold for 20' 4350.0014750.00 MWD -INC ONLY (INC>10°) 14383.00 85.98 152.89 7620.28 0.00 0.00 Start 41/100' DLS, -15.73°TF, for 134.25' 4750.0016250.00 MWD OWSG 14517.25 91.15 151.43 7623.64 4.00 -15.73 Hold for 56.84' 4750.00 29814.46 MWD+IFR2+SAG+MS 14574.09 91.15 151.43 7622.50 0.00 0.00 CD5-261-1 Tgt 01 Start 1 0/100' DLS, 165.39°TF, for 190.67' 14764.76 89.30 151.91 7621.75 1.00 165.39 Hold for 15049.81' 29814.56 89.30 151.91 7804.50 0.00 0.00 CD5-26L1 Tgt 02 TD: 29814.56' MD, 7804.5' TVD CASING DETAILS TVD MD Name 7617.84 14351.00 7-5/8 x 9-7/8 7804.50 29814.56 4-1/2 x 6-3/4 0 330 30 0 1435 14350 14540 14540- 14740 `` 1 14740 14930 300 �(� 60 14930 15120 15120 - 15320 /;- 15320 15510 15510 15700 �, >> 15700 16290 16290 16880 16880 17460 270 g ~"- ---- -- 9 0 17460 18050 18050 1 8640 19220 0 19220 __ 19810 0 19810 20400 l ` 0400 - 21580 90 --- 240 120 21580 22750 2750 23930 ` 12 3930 25110 /f 5110 26290 _ 6290 27460 7460 28640 210---,. / 150 8640 29815 180 13.04, July 25 2014 CD5-26Li wp07 TC View SURVEY PROGRAM SECTION DETAILS From To Tool MD Inc Azi TVD Dleg TFace Target Annotation 40.80 2200.00 GYD-GC-SS 14350.00 84.09 152.00 7617.75 0.00 0.00 KOP: 16%100' DLS, 250TF, for 13' 2200.0014350.00 MWD+IFR2+SAG+MS 14363.00 85.98 152.89 7618.88 16.00 25.00 Hold for 20' 4350.0014750.00 MWD -INC _ONLY (INC>10q 14383.00 85.98 152.89 7620.28 0.00 0.00 Start 4%100' DLS, -15.73°TF, for 134.25' 4750.0016250.00 MWD OWSG 14517.25 91.15 151.43 7623.64 4.00 -15.73 Hold for 56.84' 4750.00 29814.46 MWD+IFR2+SAG+MS 14574.09 91.15 151.43 7622.50 0.00 0.00 CD5-261-1 Tgt 01 Start 1 %100' DLS, 165.39°TF, for 190.67' 14764.76 89.30 151.91 7621.75 1.00 165.39 Hold for 15049.81' 29814.56 89.30 151.91 7804.50 0.00 0.00 CD5-261-1 Tgt 02 TD: 29814.56 MD, 7804.5' TVD CASING DETAILS TVD MD Name 7617.84 14351.00 7-5/8 x 9-7/8 7804.50 29814.56 4-1/2 x 6-3/4 Minor Risked 0 8 60 i �+637 330 30 350 150 0 1435 14350 -- - 14540 14540 14740 / t 14740 14930 300 60 90 14930 15120 15120 15320 )0 15320 15510 94$ 15510 15700 15700 16290 D5-26 wp0 4599• 16290 16880 14499 270 I `+`+u 90 16880 17460 17460 18050 3 18050 18640 18640 19220 19220 19810 60 19810 -- 20400 0400 21580 90 1580 22750 240 120 2750 23930 12 23930 25110 5110 26290 150 6290 27460 7460 28640 210 150 8640 29815 180 180 L cn U CO � v :> 0- LO ONJ O Q V m d _ J LO� U NO co N T M d ui � M NC? LO � U UJ Co U N LOc� N � U N � U D U i 0 U i H s O F O O/� LOL � � 0,0000 N 0 / U O LO a S� M� s N T m w o r� r Lco M LO LO CL � m CL `n � U co U co N (� O 3 J O U LO T J CO N LO V O N In T 7 7 (uin}sn 0059) bul4UoN N (� 3 J O U L cn 3 0 a 3 L � 0 N M J m LOT � U U N 11) 0 co 0 U N H O O M OS y� ■ n Oo ,^ o M s LO T M W uCID InCPLOLIS m a � v � 0 U i N O d � O LO 3 U O J 3 rn C) rl LO T J (D N LO V 3 (ui/i}sn OOss) bulglJON � � U U CD5-26L1wp07 Surface Location M CPAI Coordinate Converter - From: I Datum: NAD83 - Region: alaska C' LatitudefLongitude Decimal Degrees j C UTM Zone: [- South State Plane Zone:q Units: u ft i r Legal Description (NAD27 only) ❑ X To: — -- -- - I Datum: NAD27_j Region: alaska f f Latitude/Longitude Decimal Degrees r UTM Zone: True South C- State Plane Zone: q Units: us -ft r Legal Description (NAD27 only) Starting Coordinates:- Ending Coordinates: — --- X: 11489091.09 x 349057.935239092 Y: 15965526.59 Y: 15965780.63534594 ^Transform I CD5-26L1wp07 Surface Location M CPAI Coordinate Converter From: Datum: NAD83 Region: alaska C Latitude/Longitude Decimal Degrees C` UTM Zone: `— r- South t: State Plane Zone: q Units: us -ft r Legal Des_rptier: jtrA[i27 only Starting Coordinates: - --- - - - X: 11489091.09 Y: 15965526.59 Quit Help i Datum NAD27 - Region: lalaska {' Latitude/Longitude IDecimal Degrees UTM Zone True F South X" State Plane Zone: q Units: us -ft Legal Description (NAD27 only) r- Legal Description Township: 011 N Range: 004 E Meridian: fu -----,l Section ri8 FNL437.34287 FEL 2919.1180 r .............. .............__. Transform ..._.....:.........., Quit Help r CD5-26L1wp07 Surface Casing M CPAI Coordinate Converter From: - ---- -- - -- - Datum:gp83 + Region: alaska f_' Latitude/Longitude IDecimalDegrees + i" UTM Zone:` )" South Stake Plane Zone: F7-:1 Units: us -k + f" Legal Description (NAD27 only) r Starting Coordinates:-- ---------- — X: 11489184.88 Y: 15965146.04 CD5-26L1wp07 Surface Casing M CPAI Coordinate Converter Im�� To: Datum: NAD27 Region: alaska + Latitude/Longitude Decimal Degrees�� UTM Zone True r- South 0' State Plane Zone: I4 -IJUnits: us ft + C Legal Description (NAD27 only) r— Ending Coordinates i 1 _.......................................... Transform i From: ��----- _ Datum: Ngpg3 + Region: alaska r Latitude/Longitude Decimal Degrees t UTM Zone: — r- South State Plane Zone: 4 + Units: us -ft + t✓' �eaaR Decrpkioro INgD2r r_ ly) - Starting Coordinates: - - - - X: 11489184.88 Y: 15965146.04 l X: 349151.7109168 Y: 5965400.07995503 Quit Hefp - ❑ X Datum: NAD27 Region: alaska + f LatitudelLongitude IDecimalDegrees t" UTM Zone: True j South r State Plane Zone:. 4 Units: us ft + ire Legal Description (NAD27 only) Legal Description - - - Township 011 N Range: 004 I` Meridian JU -1 Section: 118 FNL + 815.96247 IFEL 2819-1787 :................._....... . ... ...... ..............._.......I Transform s' Quit Help CD5-26L1wp07 Kick-off Point n CPAI Coordinate Converter I !- From: -_— -- -- _ I Datum: INAD83 I Region: alaska i • Latitude/Longitude IDecimal Degrees • UTM Zone: r South i t* State Plane Zone q Units us ft r Legal Description (NAD27 only) Starting Coordinates: — ❑ X To: _—.— Datum: NAD27 Region: alaska i Latitude/Longitude IDecimalDegrees r UTM Zone: ITrue South C- Stake Plane Zone: -71 q Units: us -ft f Legal Description (NAD27 only) - - r- Ending Coordinates: X: 11492558.1 f Y: 15955019.83 CD5-26L1wp07 Kick-off Point l!3 CPAI Coordinate Converter From: Datum: NpD83 Region: alaska C Latitude/Longitude Decimal Degrees r UTM Zone:® r South 6 State Plane Zone: q Units: u. -it r Legal Des,-_npt7en (t-iAD2_f e Starting Coordinates: — >e- 11492558.1 Y: J5955019.83 X: 352524.551796524 _ Y: 5955273.69259662 Transform Quit Help — ❑ X Datum: NAD27 Region: alaska { Latitude/Longitude Decimal Degrees f UTM Zone: True r South i' State Plane Zone: q Unks: us F71 C' Legal Description (NAD27 only) Legal Description Township: 011 N _ Range: 004 E + { Meridian: U , Sec6on:29 FNL 314.19089 FEL 4562.4764 Transform Quit Help CD5-26L1wp07 TD M CPAI Coordinate Converter From: Datum: NAD83 Region: jalaska i r Latitude/Longitude IDecimalDegrees UTM Zone: South i r State Plane Zone: q Units: us ft r Legal Description (NAD27 only) Starting Coordinates: X: 11499562 Y: 15941235 CD5-26L1wp07 TD M CPAI Coordinate Converter From:— Datum: NAD83 Region: alaska (� Latitude/Longitude Decimal Degrees UTM Zone: r- South Skate Plane Zone: q Units: us ft = r" Legal Description IN,`r' :- onlpJ ❑ X To: -- - - - -- - -- — Datum: INAD27 I Region: ralaska l- Latitude/Longitude Decimal Degrees = UTM Zone: True South t: State Plane Zone: q = Units: us -ft = Legal Description (NAD27 only) Ending Coordinates: X: 359527.921422306 Y: 5941488.513251 4... Quit Help - ❑ X Datum: NAD27 Region: alaska f- Latitude/Longitude IDecimalDegrees r UTM Zone True South I State Plane Zone: 1 q Units: us -ft r:- Legal Description (NAD27 only) Starting Coordinates: Legal Description - = 1499562 Township: 010 FN--, Range: 004 E _ Y: 15941235 Meridian: U = Section:fq— FNL = 3403.9891 FEL 2616.2171 Transform Quit Help REV I DATE I BY I CK I APP DESCRIPTION REV I DATE I BY APP I DESCRIPTION 1 4/24/15 1 CZ I DB I C.A. I UPDATED PER K150003ACS 1 2 5/2/16 CZ GD I C.A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT LL LOCATION OF THIS SURVEY T12 CD -5 PAD T11 N -- CD4 TO ALPINE CD5 D ���`�' ACCESS ROAD ,.t,.,, ..•'1„ CD N z r C51 1 A p P o P LL IT cD1 iP VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. p NO CD -5 OF AD SNpp�pER 0 �S\GN ��QQaoQo�QaQaa� ��oQ�Qaa�joa x !_ OQO �tP\- C'O . L' LAiWO� WN � � • " PLANT N N a NOTE: 15.40 sz" � CONDUCTOR CD5—x14 WAS PLUGGED AND ABANDONED LCMF APRIL 2016. ���0 KUUKPIK UMIAQ ALPINE SURVEY OFFICE PHONE : 907-670-4739 ALPINE MODULE: CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE-CD50-1025 1 1 OF 3 1 2 L 4-J L40 m L O N L Q� F– L- 0 – L0 O c V) Q) N a -J O 4-J L Q) N L U N t1A fB E 4- 0 O O m C: Ln E O U .O N Z 0 a Ln Ln C:L O_ O ro O v N_ L � X O � O � O � c � Cd +1 Ln a;o N Lu ■ +j Ln U m L Ln a) 4A c a) CO U m L. c m N v I-- 4.J bD ro C O U C O v ^N �W �. D L. Q� a� C O —_ E 4J 4J Q ++ E N •- 4 `�- O 41 -0 C +�+ C U L U O a+ _0C C: C 41 c: Cv a� Ln O UA cn Q C O � O � O C: .� u OLn Q O _0 3 a) L 4 O — U f0 Cn N N Q Q tab = m O J O N =3 O U '-' � Q ca Q ,4- O 0 O Ln4-1 O a-1 Q) L CB L ++ ra Ln C: O C_ — a _..I +, 4J L�iA U O � Nl V E N �G N L a) O- U bA C =3 -0 Q) a, Q C O U (1 Ln L C ca U Q 4� C E - QJ 'n 2 N L _ LL Ln a) 4A c a) CO U m L. c m N v I-- 4.J bD ro C O U C O v ^N �W �. D L. Q� ■ L Q m iB 4- 0 L fa a N t a••+ fu A U Q m 0- a� L a -d L 00 v) 4, a, N O Oroo Co fB f0 4— aL) � N � c o � U N a N U t O i fa U Z; U N fB 0 0 c +;ro—_ aJ — 4 a) O ro L N U ate+ 15- a� t N O L � fTs > M L s a••+ O _ N U N L U aJ Q O t V o U C aJ G� m > wo > +� L a) N — U N Q s '?� 0 N U U H O v O L O ;7j L m C) dA N N 0 U > ._ U U fD V 4-+ u O O =3 O L. c CT -0 aa) aJ � N a ) CL al �[ N M L L1 C () H 0 ,} — u 0 O a) > U i Q 0 V N > L L C: 0 = fB cu aJ 0 N o U ++ m u N Y s y ++ N N fTs 0 (B L fTs fp L 0 c O v 0� i TRANSMITTAL LETTER CHECKLIST WELL NAME: Lw_ ( PTD: Z'/9 —1d�3 Development _ Service _ Exploratory Stratigraphic Test _ Non -Conventional FIELD: POOL: Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit / LATERAL No. /0 7 , API No. 50-Z0 -ZLE&I, -I' & -_5�2CD i/ (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - - -� from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of well logs to be run. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100 19 Well Name: COLVILLE RIV UNIT CRU CD5-26L1 Program DEV Well bore seg PTD#:2191080 Company ConocoPhillips Alaska _Inc. _ Initial Class/Type DEV/PEND GeoArea 890 Unit On/Off Shore On Annular Disposal ❑ Administration 1 Permit fee attached NA I2 Lease number appropriate Yes Surf Loc & Top Prod Int lie in ASRC-NPR4; Portion of Well Passes Thru ASRC-AA092344; 3 Unique well -name and number Yes Portion of Productive Interval lies in ASRC-NPR2; TD lies in ASRC-NPR5. 4 Well located in a defined pool Yes COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443C. 5 Well located proper distance from drilling unit boundary Yes CO No. 4430 contains no spacing restrictions with respect to drilling unit boundaries. 6 Well located proper distance from other wells Yes CO No. 443C has no interwell spacing restrictions. Wellbore will be more than 500' 7 Sufficient acreage available in drilling unit Yes from an external property line where ownership or landownershipchanges. 8 If deviated, is wellbore plat included Yes As planned, well conforms to spacing requirements of CO 4430 9 Operator only affected party Yes Appr Date 10 Operator has appropriate_ bond in force Yes Max formation_ pressure is 3950 psig(7.9 ppg EMW ); will drill w/ 8.8-10.8 ppg EMW VTL 8/13/2019 11 Permit can be issued without conservation order Yes Appr Date 12 Permit can be issued without administrative approval Yes MPSP is 3163_ psig; will test BOPS to 3500 psig 13 Can permit be approved before 15 -day wait Yes SFD 7/31/2019 14 Well located within area and strata authorized by Injection Order # (put 10# in comments) (For NA I15 All wells within 1/4 mile area of review identified (For service well only) - - NA H2S measures required 16 Pre -produced injector: duration of pre production less_ than 3 months (For service well only) NA NA 17 Nonconven. gas conforms to AS31.05.030Q.1-.A),(j.2.A-D) NA Permit_can be issued w/o hydrogen sulfide measures 18 Conductor stringprovidedNA Geology 36 Engineering 19 Surface casing protects all known_ USDWs - NA 20 CMT vol adequate to circulate on conductor & surf csg NA 21 CMT vol adequate to tie-in long string to surf csg NA 22 CMT will cover all known productive horizons No Productive interval will be completed with uncemented pipe with frac ports 23 Casing designs adequate for C, T, B & permafrost Yes 24 Adequate tankage or reserve pit Yes Rig has steel tanks; all waste to approved disposal wells 25 If a re -drill, has a 10-403 for abandonment been approved NA 26 Adequate wellbore separation proposed Yes Anti -collision analysis complete; Major risk failures: CD5-90, CD5-98 in zone 27 If diverter required, does it meet regulations NA Appr Date 128 Drilling fluid program schematic & equip list adequate Yes Max formation_ pressure is 3950 psig(7.9 ppg EMW ); will drill w/ 8.8-10.8 ppg EMW VTL 8/13/2019 29 BOPEs, do they meet regulation Yes 30 BOPE press rating appropriate; test to (put psig in comments) Yes MPSP is 3163_ psig; will test BOPS to 3500 psig 131 Choke manifold complies w/API RP -53 (May 84) Yes 32 Work will occur without operation shutdown Yes 33 Is presence of 1-12S gas probable Yes H2S measures required 34 Mechanical condition of wells within AOR verified (For service well only) NA 35 Permit_can be issued w/o hydrogen sulfide measures Yes Although H2Swas not encountered in offset wells, rig will be equipped with operational _sensors/alarms. Geology 36 Data presented on potential overpressure zones Yes Planned mud weights appear adequate to control the operator's forecast of most likely pore pressures Appr Date 37 Seismic analysis of shallow gas zones NA in the operator's geologic prognosis._ No abnormally geopressured strata are anticipated. Managed SFD 7/31/2019 i38 Seabed condition survey (if off -shore) NA Pressure Drilling technique will be used to maintain borehole stability in shale sections. 39 Contact name/phone for weekly progress reports_ [exploratory only] NA Geologic Engineering Public Commissioner: Date: Commissioner: Date Commissioner Date ,//5 1