HomeMy WebLinkAbout219-108DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20806-60-00Well Name/No. COLVILLE RIV UNIT CD5-26L1Completion Status1-OILCompletion Date12/4/2019Permit to Drill2191080Operator ConocoPhillips Alaska, Inc.MD17932TVD7634Current Status1-OIL4/16/2020UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR/Res/Sonic LogNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC12/10/20192202 28248 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD002_Drill.las31625EDDigital DataC12/10/201914330 14446 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD005_Drill.las31625EDDigital DataC12/10/201914383 17932 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD006_Drill.las31625EDDigital DataC12/10/201914140 14450 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope Service_RM_LWD006_Ream Down 3.las31625EDDigital DataC12/10/201950 2252 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope_Gamma_Ray_ RM_LWD001_Drill.las31625EDDigital DataC12/10/201946 17932 Electronic Data Set, Filename: CPAI_CD5-26L1_Scope_Service_RM_Well Composite.las31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Gamma_Ray_LWD001_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD002_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD005_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD006_Drill_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_LWD006_Ream_Down_003_RM.dlis31625EDDigital DataThursday, April 16, 2020AOGCCPage 1 of 3CPAI CD5-,_26L1_Scope_Service_RM_Well Composite.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20806-60-00Well Name/No. COLVILLE RIV UNIT CD5-26L1Completion Status1-OILCompletion Date12/4/2019Permit to Drill2191080Operator ConocoPhillips Alaska, Inc.MD17932TVD7634Current Status1-OIL4/16/2020UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope_Service_Well Composite_RM.dlis31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_2MD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_2TVD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_5MD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CPAI_CD5-26L1_Scope Service_RM_5TVD.Pdf31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Canvas].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Macro].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Petrel].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys [Survey].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD27 EOW Compass Surveys.pdf31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Canvas].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Macro].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Petrel].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys [Survey].txt31625EDDigital DataC12/10/2019 Electronic File: CD5-26L1 NAD83 EOW Compass Surveys.pdf31625EDDigital Data0 0 2191080 COLVILLE RIV UNIT CRU CD5-26L1 LOG HEADERS31625LogLog Header ScansThursday, April 16, 2020AOGCCPage 2 of 3
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20806-60-00Well Name/No. COLVILLE RIV UNIT CD5-26L1Completion Status1-OILCompletion Date12/4/2019Permit to Drill2191080Operator ConocoPhillips Alaska, Inc.MD17932TVD7634Current Status1-OIL4/16/2020UICNoINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:12/4/2019Release Date:8/15/2019Thursday, April 16, 2020AOGCCPage 3 of 3M. Guhl4/16/2020
RECEIVED
STATE OF ALASKA JAN 10 2020
ALASKA OIL AND GAS CONSERVATION COMMISSION r,
WELL COMPLETION OR RECOMPLETION REPORT AN L
1a. Well Status: Oil R] - Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 's�. "f `^
1b. Well Class:
Development I] Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Aband.: 12/4/2019
14. Permit to Drill Number / Sundry:
219-108 '
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
11/24/2019
15. API Number:
50-103-20806-60-00
4a. Location of Well (Governmental Section):
Surface: 438' FNL, 2919' FEL, Sec 18, T11N, R4E, UM •
Top of Productive Interval:
132' FN L, 4634' FEL, Sec 29, T11 N, R4E, UM
Total Depth:
3460' FNL, 2855' FEL, Sec 29, T11N, R4E, UM
8. Date TD Reached:
11/27/2019
16. Well Name and Number:
CRU C135-261-1 .
9. Ref Elevations: KB:73 -
GL:33.7 - BF:
17. Field / Pool(s):
Coleville River Unit /Alpine Oil Pool
10. Plug Back Depth MD/TVD:
17,932/7634 -
18. Property Designation:
ASRC.NPR4,ASRC-AA092344,
ASRC-NPR2, ASRC.NPR5
4b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 349057 y- 5965780 ' Zone- 4 .
TPI: x- 352456 y- 5955457 Zone- 4
Total Depth: x- 354181 y- 5952095 Zone- 4
11. Total Depth MD/TVD:
. 17932/7634 -
19. DNR Approval Number:
932669, 340757, 932128, 342658
12. SSSV Depth MD/TVD:
N/A
20. Thickness of Permafrost MD/TVD:
• 1325/1320
5. Directional or Inclination Survey: Yes Q (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD/TVD:
• 14369/7614
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary
GR/Res/Sonic Log
23. CASING, LINER AND CEMENTING RECORD
WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD AMOUNT
CASING FT TOP BOTTOM TOP BOTTOM HOLE SIZE CEMENTING RECORD PULLED
20 94 H-40 35 115 35 115 42 10 yds
103/4 45.5 L-80 40 2240 40 2179 13.5 850sx 11.0ppg Class G
75/8 29.7 L-80 78.4 15282 78.4 7717 9.875 1003sx 15.8ppg Class G
4112 12.6 L-80 14369 17932 7614 7634 6.5 OPEN HOLE
24. Open to production or injection? Yes E] No ❑
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
OPEN HOLE @:
14369-17932 MD and 7614-7634 TVD ,OFr,F'LETiON
DATE
lijw�9
VERIFIED
25. TUBING RECORD
SIZE DEPTHS T (MD) PACKER SET (MD/TVD)
4112 14610 14086/7572
14549/7634
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes ❑ No ❑
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
12/28/2019
Method of Operation (Flo/wing, gas lift, etc.):
G k 5 Z- f-�
Date of Test:
1/6/2020
Hours Tested:
22
Production for
Test Period
Oil -Bbl:
1611
Gas -MCF:
484
Water -Bbl:
748
Choke Size:
128 beans
Gas -Oil Ratio:
301
Flow Tubing
Press. 436
Casinq Press:
1705
Calculated
24 -Hour Rate
Oil -Bbl:
1758
Gas -MCF:
529
Water -Bbl:
816
Oil Gravity - API (corr):
Form 10-407 Revised 5/2017 17' _CONTINUED ON PAGE 2 Submit ORIGINIAL only'
RBDMS (� JAN 10 2020 �:_ar '
28. CORE DATA Conventional Core(s): Yes ❑ No 21 Sidewall Cores: Yes ❑ No 2] ,
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No 21
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1325
1320
Attach separate pages to this form, if needed, and submit detailed test
Top of Productive Interval
14145
7583
information, including reports, per 20 AAC 25.071.
Formation @ TPI -Alpine C
C-30
z 3 g I
23
C-10
K-3
Sz
1
s813
yarn
K2
Albian 97
4Go
,q Zq
Albian 96
14
Gaq
12,94
�IS9
HRZ
131115'
Kalubik
("5( 4 39
Kuparuik C
3 s9
13,95-3,
-+361
LCU/Miluveach
TD
17932
7635
Formation at total depth:
Alpine C
31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
oaleontological report, production or well test results, r 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: G.L. Alvord Contact Name: Matt Smith
Authorized Title: Alaska Drilling Manager Contact Email: Matt. Sm02(a)cop. com
Authorized Contact Phone: 263-4324
Signature: _ >�. lr • Date: 1 I l 2-
INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item 1b: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
Winston, Hugh E (CED)
From: Loepp, Victoria T (CED)
Sent: Friday, January 24, 2020 11:26 AM
To: Winston, Hugh E (CED)
Subject: FW: CRU CD5-26L1(PTD 219-108) Completions tops correction on 10-407
Attachments: CD5-26_Completion_Tops.xlsx
Hugh,
Could you please include a copy of this email with the 10-407 for the subject well. We may hand correct the original 10-
407 with this information.
Please handle and let me know if you have any questions.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. Loepp(a)alaska.gov
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria.Loepp@alaska.gov
From: Loepp, Victoria T (CED)
Sent: Friday, January 24, 2020 11:24 AM
To: Haggerty -Sherrod, Ann (Northland Staffing Services) (Ann.Haggerty-Sherrod@contractor.conocophillips.com)
<Ann. Haggerty -Sherrod @contractor.conocophillips.com>
Cc: Hoffmeister, Kathryn E <Kathryn.E.Hoff meister@conocophillips.com>; Smith, Matt
<Matt.Smith2@conocophillips.com>
Subject: CRU CD5-26L1(PTD 219-108) Completions tops correction on 10-407
All,
The corrected tops are noted and approved. We will update our copy of the 10-407 with this information. Please
include this note with your 10-407 record of this well.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Work: (907)793-1247
Victoria. Loepp6d.alaska.QOV
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Victoria Loepp at (907)793-1247 or Victoria. LoeppCalaska.gov
From: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com>
Sent: Friday, January 24, 2020 11:03 AM
To: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Cc: Hoffmeister, Kathryn E <KathrVn.E.Hoffmeister@conocophillips.com>; Smith, Matt
<Matt.Smith2@conocophillips.com>
Subject: FW: CD5-26L1 Completions tops error
Good morning Victoria,
I am seeking direction on how to proceed from here. I received the attached email this morning from the Geologist for
CD5-26 and CD5-26L1. How shall I go forward with the correction. If I re -do the second page then I would need new
signatures. Chip Alvord was the original manager signature on the document and he is out now with hip
surgery. However he does have someone else who is signing in his absence. We submitted this report 1/20/20 let me
know how to proceed from here.
Thanks,
Ann
From: Hoffmeister, Kathryn E <Kathryn.E.Hoffineister@conocophillips.com>
Sent: Friday, January 24, 2020 10:34 AM
To: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com>
Subject: CD5-261_1 Completions tops error
Good morning Ann,
It was brought to my attention that I had a typo in my CD5-261_1 tops. The tops for the CD5-26 were correct, but when
entered the C-30 through Milvueach tops for the CD5-26L1 everything was shifted down one cell. Hopefully this won't
lead to any changes as the top of the productive interval and the formation at TD for both wells were correct in the
original document. You may have already noticed the error, but here is the corrected tops list.
Let me know if you have any questions.
Thank you!
Kathryn
Kathryn Hoffmeister
Geologist- WNS Development
ATO 1760
907-263-4732
CD5 - 26 Alpine A/C Dual Lateral Producer
Final Schematic
20" 94# H-40 Welded
Conductor to 115' MD
I
I
10-3/4" 45.5# L-80 HYD 563 x
BTC
Surface Casing at 2,240' MD
4-'/z"x1"GLM
4-1/2" 12.6# L-80 Hyd 563
4-'/2" x 1" GLM
7 5/8" 29.7# L-80 TXP
Intermediate Casing at 15,281' MD
39# at heel
TOC: 12,510' MD/
6,953' TVD
4'/2" x 1" GLM
Upper Completion:
1) 4 %'-12.6# Hyd 563 tubing
2) Shallow nipple profile 3.813" X profile
3) 3x 4-1/,.' x 1" Camco KBMG GLM w/ DV
4) SLB DHG
5) TNT Packer
6) High Pressure 2.813" X sliding sleeve -up to open
7) High Burst X Nipple profile, 2.813"
8) TNT Packer
9) XN Nipple profile, 2.813"
Lower Completion:
10)ZXP liner top packer & Flexlock Liner Hanger
XO 5" Hydril 521 Box X 4-1/2" H563 pin
11) 4.5" Hydril563 12.6# L-80 w/ Frac Ports
C sand Lateral
6 1/2" Hole TD
14,369- 17,932' MD
---------------------
ConocoPhillips
Alaska. Inc.
1ANS PROD WELLNAME CD5-26 WELLBORE CD5-261-1
HORIZONTAL, CD5-261-1, 19/2020 2:13:03 PM
Last Tag
Varaeal schematic (ac l)
Annotation
Depth (kKB) End Date
Wellbore
Last Mod By
LAST TAG:
CD5-26L1
jennalt
Last Rev Reason
HANGER; 34.4
Annotation
End Date
1 Wellbore
Last Mod By
""""""""""""""""""""""""' """"""' """""'" "'
REV REASON: Lt Lateral
12/30/2019
CD5-261-7
1jennall
Casing Strings
Casing Description O110 D(in) ID (in)
Top (kKB) Set Depth (kKB) Set Depth (TVD)... Wtllen (1... Grade
Top Thread
L1 OPEN HOLE 6 1/2
14,369.0 17,932.0 7,634.3
Notes: General & Safety
End Date
Annotation
12/30/2019 NOTE: VIEW SCHEMATIC w/Alaska Schematic 10.0
CONDUCTOR; 35.0-115.0
SURFACE; 39.8-2,240.2-
9.8-2,240.2NIPPLE;
NIPPLE;2,484.8
GAS LIFT; 4,449.3
GAS LIFT; 9,479.9
GAS LIFT; 13,998.1
GAUGE/ PUMP SENSOR;
14,068.0
PACKER; 14,085.8
SLIDING SLEEVE; 14,140.9 1
NIPPLE; 14,257.4
INTERMEDIATE; 78.4-15,281.7
111
1-1 OPEN HOLE; 14,369.0-
17,932.0
Cement Detail Report
CD5-26
String: Surface Casing Cement
Job: DRILLING ORIGINAL, 10/9/2019 06:00
Cement Details
Description
Surface Casing Cement
Cementing Start Date
10/13/2019 16:00
Cementing End Date
10/13/2019 19:00
Wellbore Name
CD5-26
Comment
Cement Stages
Stage # 1
Description
Lead - Surface Casing
Cement
Objective
Lead-Isolate surface
casing annulus to surface
Top Depth (ftKB)
39.3
Bottom Depth (ftKB)
1,740.0
Full Return?
Yes
Vol Cement...
113.0
Top Plug?
No
Btm Plug?
Yes
Q Pump Init (bbl/m...
5
Q Pump Final (bbl/...
6
Q Pump Avg (bbl/...
6
P Pump Final (psi)
920.0
P Plug Bump (psi)
Recip?
1 Yes
Stroke (ft)
110.00
Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB)
Tag Method
Depth Plug Drilled Out To (ftKB) Drill
Out Diameter (in)
Comment
Lead Cement-Pumped 288.8bbls, 11ppg, Deeperete, 0.5% D167, 0.06 gps D185, 0.1gps D047
1740' to 1328'MD 50% excess
1328'MD-surface 250% excess above permafrost depth
Cement Fluids & Additives
Fluid
Fluid Type
Pre Flush
Fluid Description
Estimated Top (ftKB)
0.0
Est Btm (ftKB)
0.0
Amount (sacks)
Class
Mudpush II
Volume Pumped (bbl)
75.0
Yield (ft'lsack)
Mix H2O Ratio (gal/sa...
Free Water (%)
Density (Ib/gal)
10.50
Plastic Viscosity (cP)
Thickening Time (hr)
CmprStr 1 (psi)
Additives
Additive
Type
Concentration
Conc Unit label
Fluid
Fluid Type
Lead Cement
Fluid Description
Estimated Top (ftKB)
39.3
Est Btm (ftKB)
1,740.0
Amount (sacks)
850
Class V01ume
G 288.8
Pumped (bbl)
Yield (ft'/sack)
1.91
Mix H2O Ratio (gal/sa...
6.65
Free Water (%)
Density (Ib/gal)
11.00
Plastic Viscosity (cP)
208.0
Thickening Time (hr) CmprStr
1 (psi)
Additives
Additive
Type
Concentration
Conc Unit label
Fluid
Fluid Type
Fluid Description
Estimated Top (ftKB)
1,740.0
Est Btm (ftKB) Amount
1,740.0
(sacks)
Class Volume
Pumped (bbl)
Yield (ft'/sack)
Mix H2O Ratio (gal/sa...
Free Water I%)
Density (Ib/gal) Plastic
Viscosity (0)
Thickening Time (hr) CmprStr
1 (psi)
Additives
Additive
Type
Concentration
Conc Unit label
Stage # 2
Description
Tail - Surface Casing
Cement
Objective
Tail-Secure the shoe and
bottom 500ft of annulus
Top Depth (ftKB)
1,740.0
Bottom Depth (ftKB)
2,240.2
Full Return? Vol
Yes
Cement...
Top Plug?
Yes
Btm Plug?
No
Q Pump [nit (bbl/m... Q
5 3
Pump Final (bbl/...
Q Pump Avg (bbl/...
4
P Pump Final (psi)
445.0
P Plug Bump (psi)
1,000.0
Recip? I
Yes
Stroke (ft)
10.00
Rotated?
No
Pipe RPM (rpm)
Tagged Depth (ftKB)
Tag Method
Depth Plug Drilled Out To (ftKB) Drill
Out Diameter (in)
Comment
Tail-Pumped 59.5bbls, 15.8ppg Class G, with D-047 0.05gps, D-255 0.5%, D-065 0.3%, D-186 0.015%
2240'-1740'50% excess
Cement Fluids & Additives
Fluid
Fluid Type
Tail Cement
Fluid Description
Estimated Top (ftKB)
1,740.0
Est Btm (ftKB) Amount
2,240.0 288
(sacks)
Class Volume
G 59.5
Pumped (bbl)
Yield (ft'/sack)
1.16
Mix H2O Ratio (gal/sa...
5.04
Free Water (%)
Density (Ib/gal) Plastic
15.80 138.8
Viscosity (cP)
Thickening Time (hr) CmprStr
1 (psi)
Additives
Additive
Type
Concentration
I Conc Unit label
Page 111 Report Printed: 1/8/2020
Cement Detail Report
CD5-26
String: Intermediate Casing Cement
Job: DRILLING ORIGINAL, 10/9/2019 06:00
Cement Details
Description
Cementing Start Date
Cementing End Date
Wellbore Name
Intermediate Casing Cement
10/26/2019 05:19
10/26/2019 08:00
CD5-26
Comment
No losses during cementing.
Cement Stages
Stage # 1
Description
Objective
Top Depth (ftKB)
Bottom Depth (ftKB)
Full Return?
Vol Cement...
Top Plug?
Btm Plug?
Intermediate Casing
The greater of 500'MD or
12507VD
12,850.0
15,294.6
No
0.0
Yes
Yes
Cement
of cement
Q Pump Init (bbl/m...
Q Pump Final (bbl/...
Q Pump Avg (bbl/...
P Pump Final (psi)
P Plug Bump (psi)
Recip?
Stroke (ft)
Rotated?
Pipe RPM (rpm)
4
2
8
380.0
900.0
Yes
20.00
No
Tagged Depth (ftKB)
Tag Method
Depth Plug Drilled Out To (ftKB)Drill
Out Diameter (in)
Comment
PJSM. Blowed down top drive. R/U cement and bleeder hose. Pressure tested lines to 4,000 psi. Pumped 64 bbls of 13 ppg mud push at 4 bpm ( Pressure =
100-280 psi, F/O = 17%). Batch mixed cement. Dropped bottom plug. Pumped 214 bbls of 15.8 ppg tail cement ( Pressure = 320 psi, F/O = 16%). Dropped top
plug. Pumped 20 bbls water. Displaced 663 bbls (6,580 strokes, FCP = 360 psi, F/O = 8%) w/ rig pumps to bump the plug and pressure up to 900 psi (for 5
minutes). B/O and checked floats.
Cement was in place at 0810hr.
Cement Fluids & Additives
Fluid
Fluid Type
Fluid Description
Estimated Top (ftKB)
Est Btm (ftKB)
Amount (sacks)
Class
Volume Pumped (bbl)
Intermediate Cement
12,850.0
15,294.0 1,036
G
1214.1
Yield (ft'/sack)
Mix H2O Ratio (gai/sa...
Free Water (%)
Density (Ib/gal)
Plastic Viscosity (cP)
Thickening Time (hr)
CmprStr 1 (psi)
1.16
5.06
15.80 160.3
6.18
Additives
Additive
Type
Concentration
Conc Unit label
Page 1/1 Report Printed: 1/8/2020
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/9/2019
10/9/2019
1.50
MIRU
MOVE
RURD
P
Clean and secure cellar, raise up
0.0
0.0
06:00
07:30
outside stairs and landings.
10/9/2019
10/9/2019
2.00
MIRU
MOVE
RURD
P
Scope derrick in and secure/pin top
0.0
0.0
07:30
09:30
drive and prepare to layover.
10/9/2019
10/9/2019
0.75
MIRU
MOVE
RURD
P
Raise C-section and pin. SIMOPS-
0.0
0.0
09:30
10:15
unplug modules.
10/9/2019
10/9/2019
1.50
MIRU
MOVE
MOB
P
Prepare and skid rig floor.
0.0
0.0
10:15
11:45
10/9/2019
10/9/2019
0.25
MIRU
MOVE
MOB
P
Lower derrick. SIMOPS-Stomp motor
0.0
0.0
11:45
12:00
complex.
10/9/2019
10/9/2019
0.50
MIRU
MOVE
MOB
P
Continue to lower derrick. SI MOPS-
0.0
0.0
12:00
12:30
stomp motor complex.
10/9/2019
10/9/2019
2.50
MIRU
MOVE
MOB
P
Move pump, pits and casing modules,
0.0
0.0
12:30
15:00
get onto suspension and ready to
hook-up to Peak trucks. Place
modules to staging area.
10/9/2019
10/9/2019
3.00
MIRU
MOVE
MOB
P
Lay rig mats, raise cellar, unpin
0.0
0.0
15:00
18:00
pipeshed and move into place for
truck.
10/9/2019
10/9/2019
1.50
MIRU
MOVE
MOB
P
Continue to move pipeshed into place
0.0
0.0
18:00
19:30
for truck hook-up. Move out of way of
sub.
10/9/2019
10/9/2019
1.50
MIRU
MOVE
MOB
P
Stomp forward, turn stompers for 50ft
0.0
0.0
19:30
21:00
turn with sub off of well CD5-92
location for truck, install jeep.
10/9/2019
10/9/2019
0.50
MIRU
MOVE
MOB
P
Pull sub off mats at CD5-92 position
0.0
0.0
21:00
21:30
land position out of way..
10/9/2019
10/9/2019
1.00
MIRU
MOVE
MOB
P
Move rig mats from CD5-92 to CD5-
0.0
0.0
21:30
22:30
26.
10/9/2019
10/10/2019
1.50
MIRU
MOVE
MOB
P
Move sub onto mats at CD5-26,
0.0
0.0
22:30
00:00
position with sow, remove jeep.
10/10/2019
10/10/2019
2.00
MIRU
MOVE
MOB
P
Stomp sub complex over well CD5-
0.0
0.0
00:00
02:00
26., square and level sub over well.
SIMOPS-lay mats for pipeshed with
two loaders,
10/10/2019
10/10/2019
1.00
MIRU
MOVE
MOB
P
Hook-up and position pipeshed with
0.0
0.0
02:00
03:00
truck.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
MOB
P
Stomp pipeshed into position under
0.0
0.0
03:00
04:00
sub complex. SIMOPS - change
valves in pits.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
MOB
P
Continue stomp and changing
0.0
0.0
04:00
05:00
valves.Move pits with truck into
position. Take -off truck and stomp into
place with sub.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
MOB
P
P/U pump module on truck and stage,
0.0
0.0
05:00
06:00
10/10/2019
10/10/2019
4.00
MIRU
MOVE
MOB
P
Continue to stomp and shim pipeshed
0.0
0.0
06:00
10:00
and pin to sub.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
MOB
P
Square up, shim and spot pits to sub.
0.0
0.0
10:00
11:00
SIMOPS-move and shim casing
module into place.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
MOB
P
Square up and spot pump module to
0.0
0.0
11:00
12:00
pits. Simops-plug in pipeshed, pits to
sub.
10/10/2019
10/10/2019
1.50
MIRU
MOVE
MOB
P
Square up and spot power module to
0.0
0.0
12:00
13:30
pump module. Simops-plug in pump to
pits. Lower stairs around rig and
address landings.
10/10/2019
10/10/2019
0.50
MIRU
MOVE
RURD
P
Raise derrick. SI MOPS -plug in power
0.0
0.0
13:30
14:00
module, start to make-up pit
interconnect
Page 1/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
10/10/2019
10/10/2019
0.50
MIRU
MOVE
RURD
P
Skid rig floor over well.
0.0
0.0
14:00
14:30
10/10/2019
10/10/2019
0.75
MIRU
MOVE
RURD
P
Raise upper and lower cattle chute.
0.0
0.0
14:30
15:15
SIMOPS-Plug in sub, turn on steam to
sub.
10/10/2019
10/10/2019
0.75
MIRU
MOVE
RURD
P
Lower C-section. SIMOPS-plug in
0.0
0.0
15:15
16:00
derrick.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
RURD
P
Lower cellar house and prepare to
0.0
0.0
16:00
17:00
scope up. Swap from moving gens to
main Cat power per DDI electrician.
10/10/2019
10/10/2019
1.00
MIRU
MOVE
RURD
P
Scope derrick up and spot power
0.0
0.0
17:00
18:00
module. Hook up geronimo and
derrick climber lines, M/U mud pits
and pump room inter-connect lines,
post permit to drill.
10/10/2019
10/10/2019
4.00
MIRU
MOVE
RURD
P
Remove bridle line and yokes,
0.0
0.0
18:00
22:00
connect derrick lights, hoop up kelly
hose, install C.O.M., lower upper
derrick ladder, hook up SRL's,
SIMOPS-Load BHA, HWDP, DP into
shed and strap
10/10/2019
10/11/2019
2.00
MIRU
MOVE
RURD
P
PU High pressure surface riser, make
0.0
0.0
22:00
00:00
up surface bag, install flow box, hook
up hole fill and jet lines, load shed with
10 3/4" surface casing.
10/11/2019
10/11/2019
3.00
MIRU
MOVE
RURD
P
Tq up riser, set 90' MH, MU bell
0.0
0.0
00:00
03:00
nipple. SIMOPS, PU elevators, slips,
BHA
10/11/2019
10/11/2019
3.00
MIRU
MOVE
PULD
P
PJSM, RIH and rack back HWDP/Jars
0.0
0.0
03:00
06:00
and DC's
10/11/2019
10/11/2019
2.00
MIRU
MOVE
BHAH
P
MU 13 1/2" Surface BHA#1 per DD,
0.0
115.0
06:00
08:00
scribe/orient MWD/UBHO
10/11/2019
10/11/2019
1.00
MIRU
MOVE
BHAH
P
MU 13 1/2" surface BHA#1 as per
115.0
115.0
08:00
09:00
Schlum DD. Conduct scribe/orient
procedure. Verify offset put in
correctly.
10/11/2019
10/11/2019
1.00
MIRU
MOVE
BHAH
P
Move drillcollar stand, jars and HWDP
115.0
115.0
09:00
10:00
stand from Drillers side to off drillers
slide to accomodate wireline gyro rig-
in. PU and RU Pollard witreline for
gyro.
10/11/2019
10/11/2019
0.50
MIRU
MOVE
SFTY
P
Hold prespud meeting and AAR for rig
115.0
115.0
10:00
10:30
move.
10/11/2019
10/11/2019
0.25
MIRU
MOVE
SEQP
P
Fill conductor and riser, pressure test
115.0
115.0
10:30
10:45
mud lines to 3500psi.
10/11/2019
10/11/2019
0.25
MIRU
MOVE
CIRC
P
Establish circulation, tag base on
115.0
115.0
10:45
11:00
conductor, 350gpm, 280psi, 29%FO,
40rpm, 1-2K TQ, PU/SO=58K/66K,
RTG=60K
10/11/2019
10/11/2019
1.00
SURFAC
DRILL
DDRL
P
Spud and drill 13 1/2" surface hole
115.0
184.0
11:00
12:00
from 116-184'MD. 450gpm, 574psi,
76% FO, 40rpm, 2-4K TQ, 5K WOB,
PU/SO=58K/66K, RTG=60K, AST=O,
ART=0.55, ADT=0.55, Total Bit
Hrs=0.55, Total Jars=64.21, no losses
for tour.
10/11/2019
10/11/2019
3.25
SURFAC
DRILL
DDRL
P
Continue drill 13 1/2" surface hole
184.0
370.0
12:00
15:15
from 184'-370'MD. 550gpm, 903psi,
79% FO, 40rpm, 2-4K TQ, 5K WOB,
PU/SO=70K/66K, RTG=62K, AST=O,
ART= 1.3, ADT=1.3, Total Bit
Hrs=1.85, Total Jars=65.51, no losses
for tour.
Page 2/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/11/2019
10/11/2019
0.25
SURFAC
DRILL
OTHR
P
Swap rig to Hi -line power
184.0
370.0
15:15
15:30
10/11/2019
10/11/2019
2.50
SURFAC
DRILL
DDRL
P
Continue drilling 13 1/2" surface hole
370.0
595.0
15:30
18:00
from 370-595ft MD. 550gpm, 574psi,
78% FO, 40rpm, 2-4K TQ, 5K WOB,
PU/SO=71 K/68K, RTG=62K, AST=O,
ART=1.3, ADT=1.3, Total Bit
Hrs=1.85, Total Jars=65.51, Gyro
confirmation survey at 468.34'MD
10/11/2019
10/12/2019
6.00
SURFAC
DRILL
DDRL
P
Continue drilling 13 1/2" surface hole
595.0
1,039.0
18:00
00:00
from 595-1039ft MD. 550gpm, 550psi,
78% FO, 50rpm, 2-4K TQ, 5-7K WOB,
PU/SO=74K/82K, RTG=74K,
AST=1.07, ART=2.32, ADT=3.39,
Total Bit Hrs=7.94, Total Jars=71.60,
Gyro confirmation survey at 751ft,
940ft.
10/12/2019
10/12/2019
6.00
SURFAC
DRILL
DDRL
P
Continue drilling 13 1/2" surface hole
1,039.0
1,507.0
00:00
06:00
from 1039'-1507' MD. 600gpm,
1196psi, 80% FO, 50rpm, 3K TQ, 5-8K
WOB, PU/SO=87K/94K, RTG=88K,
AST=1.33, ART=2.13, ADT=3.46,
Total Bit Hrs=11.40, Total Jars=75.06,
Gyro survey at 1319'MD.
10/12/2019
10/12/2019
6.00
SURFAC
DRILL
DDRL
P
Continue drilling 13 1/2" surface hole
1,507.0
2,000.0
06:00
12:00
from 1507'-2000' MD. 800gpm,
1830psi, 24% FO, 50rpm, 5K TQ, 8K
WOB, PU/SO=100K/103K,
RTG=104K, pump 2 x 20bbl nutplug
sweeps, AST=1.42, ART=2.75,
ADT=4.17, Total Bit Hrs=15.57, Total
Jars=79.23,
10/12/2019
10/12/2019
3.25
SURFAC
DRILL
DDRL
P
Continue drilling 13 1/2" surface hole
2,000.0
2,252.0
12:00
15:15
from 2000'-2252'MD, 21907VD.
800gpm, 1895psi, 24% FO, 50rpm, 5K
TQ, 13K WOB, PU/SO=101K/103K,
RTG=104K, AST=0.70, ART=1.61,
ADT=2.31, Total Bit Hrs=17.88, Total
Jars=81.54, Dump and dilute @2100'
MD, 40bbl NP sweep at 2194'MD,
shoot final survey as per Schlum DD.
10/12/2019
10/12/2019
0.50
SURFAC
CASING
CIRC
P
Circulate BUx1 while standing back 1
2,152.0
2,167.0
15:15
15:45
std from 2152' to 2167'MD at 800gpm,
2175psi, 24%FO, 40rpm, 5K tq, RTG
WT=100k, total strokes pumped
=3419 Stks
10/12/2019
10/12/2019
0.25
SURFAC
CASING
SRVY
P
Drop battery Gyro
2,167.0
2,167.0
15:45
16:00
as per Gyrodata. Let fall for 5 min and
perform quadrant check as per
Gyrodata.
10/12/2019
10/12/2019
1.50
SURFAC
CASINGCIRC
P
Continue to circ BUx3 while standing
2,167.0
1,887.0
16:00
17:30
back std for each BU. from 2167" to
1887'MD. at 800gpm, 2300psi, 42%
FO, 40rpm, 5K tq, RTG wt= 100k
10/12/2019
10/12/2019
0.50
SURFAC
CASING
OWFF
P
OWFF for 30min, dropping.
1,887.0
1,887.0
17:30
18:00
Page 3/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/12/2019
10/12/2019
2.50
SURFAC
CASING
TRIP
P
Blow down jet line and line up hole fill.
1,887.0
568.0
18:00
20:30
POOH on elevators from 1887'-
1165'MD. Rack back 5" HWDP and jar
stand. PU/SP=105k/94K at 1800'.
Experienced 15K overpull POOH at
25fpm. Maintain constant hole fill over
the top. Manual strap every 5 stands.
10/12/2019
10/12/2019
2.25
SURFAC
CASING
BHAH
P
LD Schlum BHA#1 as per DD. Broke
568.0
96.0
20:30
22:45
apart collar to remove stuck Gyro tool.
Found tool lower than planned as it
passed thru UBHO. Broke apart BHA
subs to remove Gyrodata tool from
UBHO sub. LD Gyrodata tool to
ground.
10/12/2019
10/13/2019
1.25
SURFAC
CASING
BHAH
P
Conitnue lay down BHA and bit.
96.0
0.0
22:45
00:00
10/13/2019
10/13/2019
2.00
SURFAC
CASING
RURD
P
Clean rig floor and remove BHA subs.
0.0
0.0
00:00
02:00
Build DC stand from drilling
configuration. PU Doyon and rig up
Volant tool to run 10 3/4" casing.
10/13/2019
10/13/2019
4.00
SURFAC
CASING
PUTB
P
Make-up 10.75", L-80 shoe trac assbly
0.0
845.0
02:00
06:00
as per Doyon Casing rep, Bakerloking
all connections. MU torque=27k ft -lbs.
Checked floats, OK. Continue running
10.75", L-80, TXPM, 45.5ppf casing
from surface to 845'MD. installed
centralizers as per detail. Using Volant
CRT, MU torque=27k ft -lbs, PU/SO
wt=71k/73k at 800ftMD. Filled casing
on the fly and topped off every 10 jts.
10/13/2019
10/13/2019
1.25
SURFAC
CASING
PUTB
P
Continue running 10.75", L-80,
845.0
1,151.0
06:00
07:15
TXPM, 45.5ppf casing from 845'-
1151'MD. installed centralizers as per
detail. Using Volant CRT, MU
torque=27k ft -lbs,. Filled casing on the
fly and topped off every 10 jts. SO
wt=80k
10/13/2019
10/13/2019
2.25
SURFAC
CASING
PUTB
P
Establish circulation and pump down
1,151.0
1,496.0
07:15
09:30
hole while running in from 1151' to
1496'MD. Using Volant CRT, pump
rate=2 bpm, 150psi, FO=80%. Total
strokes pumped=9389stks (939bbls).
SO wt=80K
10/13/2019
10/13/2019
0.50
SURFAC
CASING
CIRC
P
CBU below permafrost and stage up
1,496.0
1,536.0
09:30
10:00
pumps to 7bpm.from 1496' to
1596'MD. Pumped 1441stks, 7bpm,
197psi, 56% FO, SO wt=78K.
10/13/2019
10/13/2019
2.00
SURFAC
CASING
PUTB
P
Continue running 10.75", L-80,
1,536.0
2,085.0
10:00
12:00
TXPM, 45.5ppf casing from 1536'-
2085'MD. installed centralizers as per
detail. Using Volant CRT, MU
torque=27k ft -lbs,. Filled casing on the
fly and topped off every 10 jts. SO
wt=80k.
Losses for tour=18bbls.
10/13/2019
10/13/2019
1.00
SURFAC
CASING
PUTB
P
Continue running 10.75", L-80,
2,085.0
2,240.0
12:00
13:00
TXPM, 45.5ppf casing from 2085'-
2240'MD. installed centralizers as per
detail. Using Volant CRT, MU
torque=27k ft -lbs,. Filled casing on the
fly and topped off every 10 jts. SO
wt=80k. PU and MU xover joint,
hanger and landing joint per FMC/DDI
reps. PU/SO wts=121 K/100K.
Page 4/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/13/2019
10/13/2019
1.75
SURFAC
CEMENT
CIRC
P
Establish circulation to condition mud
2,240.0
2,240.0
13:00
14:45
for surface casing cement job while
reciprocating. Staging up pump rate
upmaintaining 10ppg, YP=18-25,
ICP=235psi, 1.5bpm, FCP=97psi,
7bpm, FO=44%
10/13/2019
10/13/2019
0.50
SURFAC
CEMENT
CMNT
P
SD, rig up cement line to Volant
2,240.0
2,240.0
14:45
15:15
swivel.
10/13/2019
10/13/2019
0.50
SURFAC
CEMENT
CIRC
P
Re-establish circulation thru cement
2,240.0
2,240.0
15:15
15:45
line and continue to condition mud at
7bpm while reciprocating. Held PJSM,
surfce cement job, total strokes
pumped 7116 (711 bbls).
10/13/2019
10/13/2019
2.25
SURFAC
CEMENT
CMNT
P
Pump surface cement job as per
2,240.0
2,240.0
15:45
18:00
Schlum/CPAI detail. PU/SO
wt=127K/120K,
10/13/2019
10/13/2019
1.00
SURFAC
CEMENT
CMNT
P
Continue to pump surface cement as
2,240.0
2,240.0
18:00
19:00
per Schlum detail. PU/SO
wt=124K/100K. Bumped plug @1849
strokes at 3bpm w/515psi over final
displacement pressure to1000psi, held
for 5 minutes. Total pumped 1854stks,
rigged down cement hose and
checked floats, Floats held..
10/13/2019
10/13/2019
1.00
SURFAC
CEMENT
WWWH
P
Flushed surface lines, HP riser, cycled
2,240.0
2,240.0
19:00
20:00
annular and fluided past with fluid.
Pumped thru injection line on lower
spool with black water @ 5bpm.
Continued cleaning cement from pits,
through cuttings tank, Eddy pump.
Cycled annular preventer and rinsed
clean.
10/13/2019
10/13/2019
1.00
SURFAC
CEMENT
RURD
P
Rigged down casing equipment.
2,240.0
2,240.0
20:00
21:00
Cleaned out and LD Volant tool. LD
casing equipment and backed out
landing joint as per FMC rep.
10/13/2019
10/13/2019
1.00
SURFAC
CEMENT
WWWH
P
Drained riser and cleaned out cement
2,240.0
2,240.0
21:00
22:00
from annular preventer, 4" conductor
valves and cellar box.
10/13/2019
10/14/2019
2.00
SURFAC
CEMENT
NUND
P
Remove bell nipple, annular preventer
2,240.0
2,240.0
22:00
00:00
and high pressure riser.
10/14/2019
10/14/2019
3.25
SURFAC
CEMENT
NUND
P
ND Tee and slip lok adapter flange as
2,240.0
2,240.0
00:00
03:15
per FMC. Cleaned flange and layed
down. Performed Halliburton Epoxy
Cement Cemlok cap job as per HES
rep and procedure. SIMOPS-grease
choke manifold, clean rig floor
cemenmting valves,removed wellside
side valves for installtion.
10/14/2019
10/14/2019
1.00
SURFAC
WHDBOP
NUND
P
Nipple up FMC Gen 5 Unihead starter
2,240.0
2,240.0
03:15
04:15
and tubing head sections wellhead as
per FMC rep. Tested lower wellhead
seals to 1,000psi, witnessed by CPAI.
10/14/2019
10/14/2019
1.75
SURFAC
WHDBOP
NUND
P
NU high pressure riser and adapter
2,240.0
2,240.0
04:15
06:00
flange.
10/14/2019
10/14/2019
5.75
SURFAC
WHDBOP
NUND
P
Contine to NU riser and flange with
2,240.0
2,240.0
06:00
11:45
Sweeny wrench. NU BOPE, MU
choke and kill lines, MU flowbox and
flowline, RU MPD equipment.
SI MOPS - gather elevations, RU to
perform Wellworc bias testing and
MPD test.
Page 5/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (WB)
10/14/2019
10/14/2019
0.25
SURFAC
WHDBOP
NUND
P
Flood line, BOP, MPD skid with water
2,240.0
2,240.0
11:45
12:00
and purge.
10/14/2019
10/14/2019
1.50
SURFAC
WHDBOP
MPDA
P
Perform Wellworc Bias testsing thru
2,240.0
2,240.0
12:00
13:30
MPD sustem as per MPD rep.
10/14/2019
10/14/2019
1.00
SURFAC
WHDBOP
RURD
P
Pull MPD test cap, install trip nipple,
2,240.0
2,240.0
13:30
14:30
RU to test BOPE.
BOP test waived by AGOCC, Lou
Laubenstein, 06:14 10/14/2019. All
test charts are to be submitted with
test reports. AOGCC has a must catch
for the next test cycle (60days max
allowable).
10/14/2019
10/14/2019
5.50
SURFAC
WHDBOP
BOPE
P
Test BOPE. All tests 250psi
2,240.0
2,240.0
14:30
20:00
low/3500psi high for 5 charted minutes
with exception of manual operated
and super chokes tested to
250/2000psi for 5 charted minutes.
Using 5" test jt, test annular, 2 7/8" x 5
1/2" UPR, 2 7/8" x 5 1/2" LPR.
Test choke valves 1-15, manual
operated and super choke, choke and
kill manuals and HCR's, 4" valve on
kill line, Blind/shear rams, 5" TIW #1
and #2, 5" dart, upper and lower IBOP.
Perform Koomey drawdown,
ACC=2950psi, Manifold=1500psi,
ACCU=1600psi after all functions on
just bottles. 15 secs to 200psi build
with 1 electric pump, 101 secs to build
to full system pressure with 2 electric
and 2 air pumps.
Closing times, annular=23secs,
UPR=18secs, blind/shears=16secs,
LPR=16sec, Choke HCR=2 sec, kill
HCR=2sec.
10/14/2019
10/14/2019
0.50
SURFAC
WHDBOP
RURD
P
Rig down test equipment, blow down
2,240.0
2,240.0
20:00
20:30
choke line, kill line, top drive
10/14/2019
10/14/2019
0.50
SURFAC
WHDBOP
MPSP
P
Pull test plug and install 10" long wear
2,240.0
2,240.0
20:30
21:00
ring. Run in LDS.
10/14/2019
10/14/2019
1.00
SURFAC
DRILLOUT
BHAH
P
PU Schlum tools for BHA#2.
2,240.0
2,240.0
21:00
22:00
10/14/2019
10/15/2019
2.00
SURFAC
DRILLOUT
BHAH
P
PU BHA#2 as per Schlum DD. Gauge
2,240.0
2,240.0
22:00
00:00
all stabs and install floats as per DD.
Maintain constant hole fill over the top
and strap pits at start and end of BHA.
SIMOPS-pressure test MPD
equipment in BOP deck.
10/15/2019
10/15/2019
1.50
SURFAC
DRILLOUT
BHAH
P
Continue to PU BHA#2 from 127' to
2,240.0
2,240.0
00:00
01:30
605'MD as per SChlum DD. Gauge all
stabsand install floats as per DD.
Maintain constant hole fill over the top
and strap trip pit at drill collars and
HWDP. PU/SC=65K/65K at 700'MD.
10/15/2019
10/15/2019
1.00
SURFAC
DRILLOUT
TRIP
P
Trip in hole with 5" drillpipe from
2,240.0
2,240.0
01:30
02:30
derrick @ 100 fpm from 605' to 2017'.
Maintained constant hole fill and
manual strapped every 5 stands.
10/15/2019
10/15/2019
1.00
SURFAC
DRILLOUT
SEQP
P
Perform Schlum shallow test as per
2,240.0
2,240.0
02:30
03:30
DD at 2015'MD. Pumped at 650gpm,
1425psi. Circulated 1 bottoms up at
600gpm. PU/SO=99K/97K.
10/15/2019
10/15/2019
0.50
SURFAC
DRILLOUT
PRTS
P
Blow down top drive and hole fill line.
2,240.0
2,240.0
03:30
04:00
Rigged up to test casing. Flush lines
and rig up sensator to OA flange. Test
surface lines. Bleed air out of system
Page 6/51 Report Printed: 12/31/2019
- Operations Summary (with Timelog Depths)
s
s� CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftK8)
10/15/2019
10/15/2019
1.00
SURFAC
DRILLOUT
PRTS
P
Perform casing test to 3500psi/30
2,240.0
2,240.0
04:00
05:00
minutes@2015' @ 2015'MD as per
CPAI rep. Charted and witnessed.
Bled off volume to closed pit. Record
volumes and open up wellbore. Blow
down kill line and rig down casing test
equipment.
10/15/2019
10/15/2019
1.00
SURFAC
DRILLOUT
COCF
P
Wash and ream down to plugs/float
2,240.0
2,240.0
05:00
06:00
collar. Found cement at 2163'MD.
Establish drilling rate as per Schlum
DD. 600gpm/1445psi, TQ off=3-4K,
TQ on=3.5K, PU/SO=1 08K/1 03K.
10/15/2019
10/15/2019
6.00
SURFAC
DRILLOUT
DRLG
P
Drill out wiper plugs and float
2,240.0
2,240.0
06:00
12:00
collar/shoe tack and rathole as per DD
from 2163'MD to 2240' MD (shoe),
650gpm, 1445psi, 30-40rpm, 3-4K tq,
1 Ok WOB, RTG wt=105K,
10/15/2019
10/15/2019
0.50
SURFAC
DRILLOUT
DDRL
P
Cleaned rathole to 2252' and drilled
2,252.0
2,272.0
12:00
12:30
20 ft of new hole to 2272'MD, 650
gpm, 1445psi, 30-40rpm, 3-4K TQ, 10
-20K WOB, RTG WT=105K displacing
to 9.6ppg LSND on the fly.
10/15/2019
10/15/2019
0.50
SURFAC
DRILLOUT
DISP
P
Continue to displace to 9.6 ppg LSND
2,272.0
2,272.0
12:30
13:00
mud until even in/out while rotating
and reciprocating from 2271'MD to
2239'MD with 650gpm, 1073psi,
FO=32%, RPM=80, TQ off=3K,
PU/SO= 1 08K/1 03K, RTG wt=105K,
rtg tq=3K, total pumped=4559 strokes
(456bbls).
10/15/2019
10/15/2019
0.50
SURFAC
DRILLOUT
TRIP
P
Pull back into casing racking back one
2,272.0
2,272.0
13:00
13:30
stand PU Wt=108k, OWFF, Static
10/15/2019
10/15/2019
0.25
SURFAC
DRILLOUT
FIT
P
Rig up to conduct F.I.T test.
2,272.0
2,272.0
13:30
13:45
10/15/2019
10/15/2019
1.00
SURFAC
DRILLOUT
FIT
P
Perform F.I.T. test to 1050psi charted.
2,272.0
2,272.0
13:45
14:45
Rig out test equipment and lines.
Calculated F.I.T.=18.9 ppg with 9.6ppg
mud.
10/15/2019
10/15/2019
1.50
INTRM1
DRILL
DDRL
P
RIH one stand to bottom and drill 9
2,272.0
2,390.0
14:45
16:15
7/8" hole from 2272' to 2390'MD,
(2179'TVD), 700 gpm, 1275psi, 34%
FO, 100 rpm, 6K WOB, off bottom
1257psi, PU/SO110k?109K.
RTG=104K, 2K TQ.
10/15/2019
10/15/2019
0.75
INTRM1
DRILL
CIRC
P
Obtain baseline parameters and drop
2,390.0
2,390.0
16:15
17:00
underreamer opening ball as per
Schlum DD, 50rpm, 2.5K tq, 1248psi,
700gpm, PU/SO=110k/109K. RTG
wt=104K, pump down ball at 50spm,
56psi, 30rpm, 2K tq. Ball on seat at
167 strokes, inc pump rate as per
Schlum DD to open reamer at
1252psi. Verified open against
baseline parameters and pull/ledge
test.
10/15/2019
10/15/2019
0.50
INTRM1
DRILL
UREM
P
Ream down rest of std with reamer
2,390.0
2,390.0
17:00
17:30
open from 2269-2390'MD, 850gpm,
1297psi, 100RPM, 4K TQ.
Page 7/51 Report Printed: 12/31/2019
- - Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
10/15/2019
10/15/2019
0.50
INTRM1
DRILL
DDRL
P
Drlg 9 7/8"x11' intermediate hole with
2,390.0
2,452.0
17:30
18:00
underreamer from 2390'-2452'MD,
2366'TVD, 850gpm, 1074psi, 65% FO,
120rpm, 6K TQ, 1 OK WOB,
PU/SO=110K/109K, RTG wt=104K,
3K TQ
ADT=1.45, total bit hours=1.45, total
jars=82.99
SPR's at 2994md (2227'TVD),
MW=9.6ppg
MP#1 - 30/40spm, 120/150psi
MP#2 - 30/40spm, 120/150psi
10/15/2019
10/16/2019
6.00
INTRM1
DRILL
DDRL
P
Drlg 9 7/8"x11' intermediate hole with
2,452.0
3,883.0
18:00
00:00
underreamer from 2455'-3308'MD,
3308'MD, 850gpm, 1740psi, 72% FO,
120rpm, 6K TQ, 1 OK WOB,
PU/SO=1 1 9K/1 06K, RTG wt= 116K, 4K
TQ
ADT=1.45, total bit hours=1.45, total
jars=82.99SPR's@5963'M D,
40787VD, 9.7ppg,
10/16/2019
10/16/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
3,308.0
3,883.0
00:00
06:00
underreamer from 3308'-3900'MD,
31837VD, 850gpm, 1900psi, 74%
FO, 140rpm, 8K TQ, 10-12K WOB, off
bttm=1897psi, PU/SO=120K/106K,
RTG wt=117K, 4.5K TQ
ADT=4.21, total bit hours=10.20, total
jars=91.74
10/16/2019
10/16/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
3,900.0
4,763.0
06:00
12:00
underreamer from 3900'-4763'MD,
3563'TVD, 850gpm, 2417psi, 79%
FO, 150rpm, 9K TQ, 26K WOB, off
bttm=2390psi, PU/SO=135K/113K,
RTG wt=125K, 4.5K TQ
ADT=3.95, total bit hours=14.15, total
jars=95.69
10/16/2019
10/16/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
4,763.0
5,594.0
12:00
18:00
underreamer from 4763'-5594'MD,
39157VD, 850gpm, 2297psi, 79%
FO, 180rpm, 9K TQ, 26K WOB,
ECD=11.01 ppg,
Off Bttm=2100psi,
PU/SO= 1 39K/1 24K, RTG wt= 126K,
5K TQ
ADT=3.97, total bit hours=18.12, total
jars=96.66
Page 8/51 Report Printed: 12/31/2019
- Operations Summary (with Timelog Depths)
CD5-26
01.6
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/16/2019
10/17/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
5,597.0
6,720.0
18:00
00:00
underreamer from 5594'-6720'MD,
4410'TVD, 850gpm, 2475psi, 80%
FO, 180rpm, 12K TQ, 15K WOB,
ECD=11.01 ppg,
Off Bttm=2460psi,
PU/SO=141 K/1 22K, RTG wt= 127K,
4.5K TQ
ADT=3.82, total bit hours=21.94, total
jars=103.48hrs
Pumped to/hi jamming sweep
@6346'MD
Dump and dilute @ 6600'MD w/
9.2ppg LSND mud
SPR's@5963'MD, 4078'TVD, 9.7ppg,
19:35hrs
#1 MP - 20/30spm, 230/270psi
MP#2 - 20/30spm - 225/265psi
Tour Losses=0
10/17/2019
10/17/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
6,720.0
7,739.0
00:00
06:00
underreamer from 6720'-775OMD,
48647VD, 850gpm, 2471 psi, 78%
FO, 180rpm, 14K TQ, 15K WOB,
ECD=10.95ppg,
Off Bttm=2450psi,
PU/SO=165K/135K, RTG wt=144K,
10K TQ
ADT=3.86, total bit hours=25.80, total
jars=107.34hrs
Pumped to/hi jamming sweep
@6346'MD
SPR's@7000'MD, 4582'TVD,
9.7+ppg, 19:35hrs
#1 MP - 20/30spm, 230/270psi
MP#2 - 20/30spm - 225/265psi
Tour Losses=0
10/17/2019
10/17/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
7,739.0
8,761.0
06:00
12:00
underreamer from 7739'-8761'MD,
53047VD, 850gpm, 2172psi, 78%
FO, 180rpm, 17.5K TQ, 22K WOB,
ECD=11.03ppg,
Off Bttm=2100psi,
PU/SO=177K/134K, RTG wt=147K,
10K TQ
ADT=3.5, total bit hours=29.3, total
jars=110.84hrs
Pumped to/hi jamming sweep
@6346'MD
Dump and dilute 280bbls@ 7945'MD
Pump LO/HIGH sweeps at 8229' and
8508'
Page 9/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/17/2019
10/17/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
8,761.0
10,017.0
12:00
18:00
underreamer from 8761'-10017'MD,
5850'TVD, 850gpm, 2572psi, 78%
FO, 180rpm, 20K TQ, 24K WOB,
ECD=11.07ppg,
Off Bttm=2500psi,
PU/SO=178K/162K, RTG wt=147K,
14K TQ
ADT=3.72, total bit hours=33.02, Total
jars=114.56hrs
Dump and dilute 280bbls@ 9630'MD
SPR's@7000'MD, 45827VD,
9.7+ppg, 19:35hrs
#1 MP - 20/30spm, 230/270psi
MP#2 - 20/30spm - 225/265psi
Tour Losses=0
10/17/2019
10/18/2019
6.00
INTRMI
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
10,017.0
11,230.0
18:00
00:00
underreamer from 10017'-11230'MD,
6390 'TVD, 850gpm, 2675psi, 74%
FO, 180rpm, 24K TQ, 23K WOB,
ECD=11.01 ppg,
Off Bttm=2500psi,
PU/SO=202K/160K, RTG wt=172K,
15K TQ
ADT=4.24, total bit hours=37.26, total
jars=1 1 8.80hrs
Dump and dilute 280bbls@ 10580'MD
SPR's@7000'MD, 45827VD,
9.7+ppg, 19:35hrs
#1 MP - 20/30spm, 230/270psi
MP#2 - 20/30spm - 225/265psi
Tour Losses=0
10/18/2019
10/18/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
11,230.0
11,970.0
00:00
06:00
underreamer from 11230'-11970'MD,
6712'TVD, 850gpm, 2610psi, 74%
FO, 180rpm, 25K TQ, 23K WOB,
ECD=10.73ppg,
Off Bttm=1225psi at 550gpm,
PU/SO=238K/148K, RTG wt=182K,
17K TQ
ADT=4.11, total bit hours=41.37, total
jars=122.91 hrs
Pumped 20/20 to/hi vis anti -jamming
sweep at 11335'MD
Dump and dilute 550bbls@
115200'MD
Page 10/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
10/18/2019
10/18/2019
4.25
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
11,970.0
12,563.0
06:00
10:15
underreamer from 11970'-12563'MD,
6938'TVD, 850gpm, 2760psi, 74%
FO, 180rpm, 26K TQ, 19K WOB,
ECD=10.85ppg,
Off Bttm=1278psi at 550gpm,
PU/SO=244K/146K, RTG wt=186K,
19K TQ
ADT=2.83, total bit hours=44.20, total
jars=125.741 hrs
10/18/2019
10/18/2019
0.75
INTRM1
DRILL
CIRC
P
Rotate and reciprocate bottoms up
12,563.0
12,563.0
10:15
11:00
@55spm @1200psi, RPM=160, 17K
TQ, SIMOPS - PJSM on pulling trip
nipple and installing RCD bearing.
10/18/2019
10/18/2019
0.50
INTRM1
DRILL
OWFF
P
Blow down Top Drive and prepare to
12,563.0
12,563.0
11:00
11:30
install RCD bearing as per MPD rep.
OWFF=static.
10/18/2019
10/18/2019
0.50
INTRM1
DRILL
MPDA
P
Pull trip nipple and install RCD as per
12,563.0
12,563.0
11:30
12:00
MPD rep. Rotate pip@5rpm. Broke in
RCD bearing for 5 mins @50rpm.
Follow with 100rpm for 5 mins.
Tour losses=0.
10/18/2019
10/18/2019
6.00
INTRMI
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
12,563.0
12,875.0
12:00
18:00
underreamer from 12563'-12875'MD,
71107VD, 850gpm, 3270psi, 65%
FO, 160rpm, 26K TQ, 19K WOB,
ECD=11.48ppg,
Off Bttm=1675psi at 550gpm,
PU/SO=266K/144K, RTG wt=182K,
21KTQ
ADT=3.95, total bit hours=48.15, total
jars=129.69hrs
10/18/2019
10/19/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
12,875.0
13,346.0
18:00
00:00
underreamer from 12876-13346'MD,
73157VD, 850gpm, 3407psi, 48%
FO, 160rpm, 27K TQ, 16K WOB,
ECD=11.64ppg,
Off Bttm=1775psi at 550gpm,
PU/SO=270K/150K, RTG wt=185K,
21KTQ
ADT=4.55, total bit hours=52.70, total
jars=134.241 hrs
SPR's@12938'MD, 7138'TVD,
10.2ppg, 19:30hrs
MP#1 - 20spm, 540/250psi(MPD),
30spm, 560/210psi(MPD)
MP#2 - 20spm, 540/250psi(MPD).
30spm, 560/210psi(MPD)
Tour Losses=0
Page 11/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
10/19/2019
10/19/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
13,346.0
13,693.0
00:00
06:00
Rhino underreamer from 13346'-
13693'MD, 7463'TVD, holding 375psi
back pressure MPD with injection
pump on connections, (11.5ppg
MWE), 850gpm, 3637psi, 57% FO,
160rpm, 28K TQ, 18K WOB,
ECD=11.67ppg, ADT=5.16, total bit
hours=57.86, total jars=139.401 hrs
Lubes and glass bead additions
working well to keep torques
manageable.
10/19/2019
10/19/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
13,693.0
14,072.0
06:00
12:00
Rhino underreamer from 13693'-
14072'MD, 7570'TVD, holding 375psi
back pressure MPD with injection
pump on connections, (11.5ppg
MWE), 850gpm, 3387psi, 57% FO,
160rpm, 28K TQ, 28K WOB,
ECD=11.67ppg, ADT=4.76, total bit
hours=62.62, total jars=144.16hrs
SPR's@14070'MD, 7570'TVD,
10.4+ppg, 11:500hrs
MP#1 - 30spm, 680/265psi(MPD),
40spm, 680/245psi(MPD)
MP#2 - 30spm, 270/270psi(MPD).
40spm, 680/250psi(MPD)
10/19/2019
10/19/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
14,072.0
14,380.0
12:00
18:00
Rhino underreamer from 14072'-
14380'MD, 7612'TVD, holding 375psi
back pressure MPD with injection
pump on connections, (11.5ppg
MWE), 850gpm, 3703psi, 57% FO,
160rpm, 23K TQ, 25K WOB,
ECD=11.57ppg, ADT=4.65, total bit
hours=67.27, total jars=148.81 hrs
10/19/2019
10/20/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
14,380.0
14,683.0
18:00
00:00
Rhino underreamer from 14380'-
14683'MD, 76487VD, holding 375psi
back pressure MPD with injection
pump on connections, (11.5ppg
MWE), 850gpm, 3560psi, 58% FO,
120-160rpm (some torque shocks
observed in alternating lithology), 26K
TQ, 25K WOB, ECD=11.54ppg,
ADT=5.32, total bit hours=72.59, total
jars=154.13hrs
No losses last 24 hours
No PU and SO weights recorded
through the shale sections.
Page 12/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/20/2019
10/20/2019
6.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
14,463.0
15,145.0
00:00
06:00
Rhino underreamer from 14683'-
15145'
MD, 7698'TVD, holding 375psi back
pressure MPD with injection pump on
connections, (11.5ppg MWE),
850gpm, 3820psi, 51% FO, 120rpm,
27K TQ, 24K WOB, ECD=11.56ppg,
ADT=4.82, total bit hours=77.41, total
jars=158.95hrs
No PU and SO weights recorded
through the shale sections.
10/20/2019
10/20/2019
2.00
INTRM1
DRILL
DDRL
P
RWD 9 7/8"x11" intermediate hole with
15,145.0
15,294.0
06:00
08:00
Rhino underreamer from 15145'-
15294'
MD, 7714'TVD, FINAL INT TD,
holding 375psi back pressure MPD
with injection pump on connections,
(11.5ppg MWE), 850gpm, 3940psi,
51 % FO, 120rpm, 27K TQ, 24K
WOB, TQ=20K off bttm,
ECD=11.57ppg, ADT=1.86, total bit
hours=79.27, total jars=160.81 hrs
No PU and SO weights recorded
through the shale sections.
10/20/2019
10/20/2019
4.00
INTRM1
CASING
CIRC
P
CBU x 4, rack back stand after 1 BU
15,294.0
15,110.0
08:00
12:00
after reciprocating 15294'- 15, 11OVD.
weight up to 10.8ppg, rpm= 160,
tq=23k, gpm=850, psi=3940
10/20/2019
10/20/2019
2.00
INTRM1
CASING
CIRC
P
Continue to circ 4xBU, R/B stand after
15,110.0
15,110.0
12:00
14:00
reciprocating 15191' to 15110',
MW=10.8ppg, rpm=160, TQ=23K,
GPM=850, psi=3940
10/20/2019
10/20/2019
4.00
INTRM1
CASING
BKRM
P
BROOH from 15110'-14067"MD,
15,110.0
14,067.0
14:00
18:00
gpm=800, psi=3560, rpm= 150, tq=19-
20K, FP=61%, ECD=11.89ppg, RTG
WT=186K
10/20/2019
10/21/2019
6.00
INTRM1
CASING
BKRM
P
BROOH from 14067'-13594'MD,
14,067.0
13,594.0
18:00
00:00
gpm=775, psi=3420, rpm=125, tq=19-
22K, pulling at 225fph„ FO=61 %,
ECD=11.92ppg, RTG WT=178K
Encountered tight spot/pack-off @
14073'MD.
Tour Losses = 205bbls (123 bbls est.
loss at 14073'MD)
10/21/2019
10/21/2019
6.00
INTRM1
CASING
BKRM
P
BROOH F/ 13,594' MD - T/ 13,121`
13,594.0
13,121.0
00:00
06:00
MD, W/ GPM = 775, PSI = 3375, RPM
= 160TQ = 22K. F/O = 60%, ECD =
12.0 PPG, RT WT = 180K
10/21/2019
10/21/2019
6.00
INTRM1
CASING
BKRM
P
BROOH F/ 13,121' MD - T/ 12,648'
13,121.0
12,648.0
06:00
12:00
MD, W/ GPM = 800, PSI = 3102, RPM
= 160, TQ = 19-20K. F/O = 50%, ECD
= 11.91 PPG, RT WT = 176K
Page 13151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/21/2019
10/21/2019
4.75
INTRM1
CASING
CIRC
P
CBU X 4 Racking back a stand each 2
12,648.0
12,552.0
12:00
16:45
B/U, Pump High Vis Nut Plug & High
Vis High Density sweeps, F/
12,648'MD T/ 12,552'MD, GPM =
800, PSI = 3120, RPM = 160, TQ =
16.5K. F/O = 65%, ECD = 11.98PPG,
10/21/2019
10/21/2019
1.00
INTRM1
CASING
CIRC
P
Drop ball (DIA.1.65) to close Rhino
12,552.0
12,552.0
16:45
17:45
reamer as per SLB rep. Parameters
before, 700 gpm @ 2525, 50 rpm @
16.5k Tq. P/U=178K, S/O=170K,
ROT= 175K, TRPM=2343, After ball
seat @1772 STKS, 360 PSI increase
sheared @235 GPM, PSI=2100, 700
GPM, TRPM=2890,
10/21/2019
10/21/2019
0.25
INTRM1
CASING
SMPD
T
B/D Top drive, attempt to SOOH on
12,552.0
12,552.0
17:45
18:00
elevators @ 12,552' MD. Observed
45k overpull repeated.
10/21/2019
10/21/2019
0.50
INTRM1
CASING
SMPD
T
Continue attempt to SOOH from
12,552.0
12,525.0
18:00
18:30
12,552' MD to 12,525' MD with 50k
OP, unsuccessful.
10/21/2019
10/22/2019
5.50
INTRM1
CASING
BKRM
P
M/U to top drive and backream out @
12,525.0
11,910.0
18:30
00:00
130 fph from 12,525' MD to 11,910'
MD. 650 gpm @ 2424 psi, 160 rpm 18
-22k Tq. Maintagin ECD below 11.9
ppg, ROT wt= 165k.
Tour Losses=0 bbls
10/22/2019
10/22/2019
6.00
INTRM1
CASING
BKRM
P
BROOH from 11,910' MD to 11,465'
11,910.0
11,465.0
00:00
06:00
MD w/ GPM = 650 gpm, SPP = 2440
psi, Rotary = 160 rpm, TQ = 17-24
kftlbs, F/O = 32%, ECD =11.86 ppg,
and RT Wt = 160 klbs.
10/22/2019
10/22/2019
0.75
INTRM1
CASING
BKRM
P
BROOH from 11,465' MD to 11,420'
11,465.0
11,420.0
06:00
06:45
MD w/ GPM = 650 gpm, SPP = 2440
psi, Rotary = 160 rpm, TQ = 17-24
kftlbs, F/O = 32%, ECD =11.86 ppg,
and RT Wt = 160 klbs.
10/22/2019
10/22/2019
2.25
INTRM1
CASING
CIRC
P
CBU 2X. Pumped 80 bbls HVNP
11,420.0
11,420.0
06:45
09:00
sweep and diution. Rotated and
reciprocated. GPM - 640 gpm, SPP =
2,264 psi, Rotary = 160 gpm, and TQ
= 13-15 kftlbs.
10/22/2019
10/22/2019
1.00
INTRM1
CASING
SMPD
T
Attempted to SOOH on elevators.
11,420.0
11,420.0
09:00
10:00
Observed 50 klbs OP. Attempted to
work through 5 X. Observed 50 klbs
OP each time.
10/22/2019
10/22/2019
2.00
INTRM1
CASING
PMPO
P
Pumped out of hole from 11,420' MD
11,420.0
10,852.0
10:00
12:00
to 10,852' MD w/ 5" DP/ Racked back
in derrick. GPM = 645 gpm, SPP =
2,320 psi, P/U Wt = 228 klbs, S/O Wt
= 118 klbs, Monitored displacement on
pits 2-4. B/D T/D.
10/22/2019
10/22/2019
6.00
INTRM1
CASING
SMPD
P
SOOH on elevators w/ MPD from
10,852.0
7,363.0
12:00
18:00
10,852' MD to 7,363' MD. B/P in slips
= 190 psi, B/P out of slips = 340 psi.
P/U Wt = 171 klbs, S/O Wt = 116 klbs,
Monitored displacement on pits 2-4.
10/22/2019
10/22/2019
1.00
INTRM1
CASING
SMPD
P
SOOH on elevators w/ MPD from
7,363.0
6,970.0
18:00
19:00
7,363' MD to 6,970' MD. B/P in slips =
185 psi, B/P out of slips = 330 psi.
Monitored displacement on pits 1-4.
Page 14151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (MB)
10/22/2019
10/22/2019
1.00
INTRM1
CASING
CIRC
P
Circulated, rotated and reciprocated
6,970.0
6,970.0
19:00
20:00
from 7,041' MD to 6,970' MD w/ GPM
= 675 gpm, SPP = 2,065 ps, F/O =
40%, Rotary = 160 rpm, and TQ = 10 -
27 kftlbs to breakover. ECD = 11.7
ppg, RT Wt = 130 kibs, Total Strokes =
8000.
10/22/2019
10/23/2019
4.00
INTRM1
CASING
BKRM
P
BROOH from 6970' MD to 6,303' MD
6,970.0
6,303.0
20:00
00:00
w/ GPM = 675 gpm, SPP = 1,950 psi,
Rotary = 160 rpm, TQ = 8-12 kftlbs,
F/O = 51 %, ECD = 11.76 ppg, and Rot
Wt = 126 klbs.
10/23/2019
10/23/2019
3.00
INTRMI
CASING
BKRM
P
BROOH from 6,303' MD to 5,691' MD
6,303.0
5,691.0
00:00
03:00
w/ GPM = 675 gpm, SPP = 1,900 psi,
Rotary = 160 rpm, TQ = 8-12 kftlbs,
F/O = 51 %, ECD = 11.76 ppg, and Rot
Wt = 122 klbs.
10/23/2019
10/23/2019
1.75
INTRM1
CASING
CIRC
P
Circulated, rotated and reciprocated
5,691.0
5,691.0
03:00
04:45
from 5,691' MD to 5,740' MD w/ GPM
= 675 gpm, SPP = 1,670 ps, F/O =
52%, Rotary = 160 rpm, and TQ = 8
kftlbs. ECD = 11.68 ppg, and RT Wt =
120 klbs. Pumped 40 bbis H.V. Nut
plug sweep and 40 bbls weighted nut
plug sweeps w/ no observed increase
in cuttings returned. Total pumped
strokes = 13,000. SIMOPS: L/D 16
stands of 5" DP off line.
10/23/2019
10/23/2019
1.25
INTRM1
CASING
SMPD
P
Blowed down top drive. SOOH from
5,691.0
5,105.0
04:45
06:00
5,691' MD to 5,105' MD w/ 5" DP and
racked back in derrick. P/U Wt = 99
klbs, S/O Wt = 94 klbs, Monitored
displacement on pits 3-4.
10/23/2019
10/23/2019
4.00
INTRM1
CASING
SMPD
P
SOOH on elevators w/ MPD from
5,105.0
2,162.0
06:00
10:00
5,105' MD to 2,162' MD. B/P in slips =
175 psi, B/P out of slips = 340 psi. P/U
Wt = 99 klbs, S/O Wt = 94 klbs.
Monitored displacement on pits 3-4.
10/23/2019
10/23/2019
1.50
INTRM1
CASING
CIRC
P
CBU 2X. Pumped 40 bbls HVNP and
2,162.0
2,162.0
10:00
11:30
70 bbls HVNP sweeps. GPM = 580
gpm, SPP = 1,295 ps, Rotary = 60
rpm, and TQ = 3 kftlbs.
10/23/2019
10/23/2019
0.50
INTRM1
CASING
OWFF
P
OWFF (Static).
2,162.0
2,162.0
11:30
12:00
10/23/2019
10/23/2019
0.75
INTRMI
CASING
SMPD
P
SOOH on elevators w/ MPD from
2,162.0
1,000.0
12:00
12:45
2,162' MD to 1,000' MD. B/P in slips =
175 psi, B/P out of slips = 340 psi. P/U
Wt = 86 klbs, S/O Wt = 91 klbs.
Monitored displacement on pits 3-4.
10/23/2019
10/23/2019
1.00
INTRM1
CASING
MPDA
P
PJSM. Pulled MPD bearing and
1,000.0
1'000-0-
12:45
13:45
installed trip nipple.
10/23/2019
10/23/2019
0.25
INTRM1
CASING
TRIP
P
POOH on elevators from 1,000' MD to
1,000.0
605.0
13:45
14:00
605' MD w/ 5" DP racked back in
derrick. P/U Wt = 71 kfbs, S/O Wt = 81
klbs. Monitored displacement on pit 3.
10/23/2019
10/23/2019
4.00
INTRM1
CASING
BHAH
P
PJSM. L/D BHAfrom 605' MD to
605.0
0.0
14:00
18:00
surface. Monitored displacement on
pit 3.
10/23/2019
10/23/2019
1.00
INTRMI
CASING
BHAH
P
Cleaned and cleared rig floor. Laid
0.0
0.0
18:00
19:00
down remaining BHA components.
10/23/2019
10/23/2019
0.50
INTRM1
CASING
WWWH
P
Flushed BOP stack at 7 bpm w/ 85 psi
0.0
0.0
19:00
19:30
from ground level to annular
preventers.
Page 15/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/23/2019
10/23/2019
1.00
INTRM1
CASING
BOPE
P
Blowed down top drive and hole fill
0.0
0.0
19:30
20:30
line. Pumped out BOP stack and
retrieved 10" Wear ring. Built 7 5/8"
test joint and installed upper test plug.
10/23/2019
10/23/2019
1.00
INTRM1
CASING
BOPE
P
Closed blind rams and bled down
0.0
0.0
20:30
21:30
Koomey. C/O upper VBRs for 7.625"
straight body rams. Energized
Koomey.
10/23/2019
10/23/2019
1.75
INTRM1
CASING
BOPE
P
Rigged up to test Annular and UPR on
0.0
0.0
21:30
23:15
7.625" test joint. Tested annular to 250
psi/2500 psi (Passed). Tested UPR to
250 psi/3500 psi (Passed). Rigged
down testing equipmen. Blow down.
Broke down 7.625" test joint. Cleaned
and cleared rig floor.
10/23/2019
10/24/2019
0.75
INTRM1
CASING
SLPC
P
Hung the block and rigged up to slip
0.0
0.0
23:15
00:00
and cut drill line.
10/24/2019
10/24/2019
1.25
INTRM1
CASING
SLPC
P
Slipped and cut 110' of drill line.
0.0
0.0
00:00
01:15
Unhung blocks. Calibrated
Amphion/Totco, Checked Crown-o-
matic. Cleared and cleaned up tools.
10/24/2019
10/24/2019
1.25
INTRM1
CASING
RURD
P
R/U casing running equipment.
0.0
0.0
01:15
02:30
Torqued Volant to Top Drive to 37
kftlbs.
10/24/2019
10/24/2019
3.50
INTRM1
CASING
PUTB
P
P/U 7 5/8" 39 ppf TXP from surface to
0.0
922.0
02:30
06:00
922' MD. M/U, Baker locked, and
torqued shoe track to 26.1 klbs.
Checked floats. Filled pipe on the fly
using the Volant tool whilst topping off
every 10th joint. Manually strapped
trip pit every 10 joints. P/U Wt = 67
klbs, and S/O Wt = 72 klbs at 850'
MD.
10/24/2019
10/24/2019
6.00
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 39 ppf TXP casing from
922.0
3,340.0
06:00
12:00
922' MD to 3,340' MD. MUT = 26.1
kftlbs. Filled pipe on the fly using the
Volant tool whilst topping off every
10th joint. Manually strapped trip pit
every 10 joints. P/U Wt = 134 klbs,
and S/O Wt = 133 klbs.
10/24/2019
10/24/2019
3.25
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 39 ppf TXP casing from
3,340.0
4,992.0
12:00
15:15
3,340' MD to 4,992' MD. MUT = 26.1
kftlbs. Filled pipe on the fly using the
Volant tool whilst topping off every
10th joint. Manually strapped trip pit
every 10 joints. P/U Wt = 170 klbs,
and S/O Wt = 140 klbs.
10/24/2019
10/24/2019
0.50
INTRMI
CASING
RURD
P
PJSM. Changed out cup and stabbing
4,992.0
4,992.0
15:15
15:45
head on CRT.
10/24/2019
10/24/2019
1.75
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 39 ppf TXP casing from
4,992.0
5,784.0
15:45
17:30
4,992' MD to 5,784' MD. MUT = 21.3
kftlbs. Filled pipe on the fly using the
Volant tool whilst topping off every
10th joint. Manually strapped trip pit
every 10 joints. P/U Wt = 184 klbs,
and S/O Wt = 136 klbs.
10/24/2019
10/24/2019
0.50
INTRM1
CASING
CIRC
P
CBU. Staging up to 6 bpm. SPP = 316
5,784.0
5,784.0
17:30
18:00
psi. Initial loss rate was 40 bph.
10/24/2019
10/24/2019
1.00
INTRM1
CASING
CIRC
P
Continued circulating at 6 bpm. w/ ICP
5,784.0
5,784.0
18.00
19:00
= 385 psi and FCP = 320 psi. Pumped
5,800 strokes. Pumped until mud was
10.9 ppg in and out. P/U Wt = 176
klbs, and S/O Wt = 138 klbs.
Page 16/51 Report Printed: 12/31/2019
-- Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(MB)
End Depth (ftKB)
10/24/2019
10/25/2019
5.00
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 39 ppf TXP casing from
5,784.0
8,300.0
19:00
00:00
5,784' MD to 8,300' MD. MUT = 21.3
kftlbs. Filled pipe on the fly using the
Volant tool whilst topping off every
10th joint. Manually strapped trip pit
every 10 joints. P/U Wt = 246 klbs,
and S/O Wt = 140 klbs @ 8,000' MD.
10/25/2019
10/25/2019
2.25
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 29.7 ppf TXP casing
8,300.0
9,100.0
00:00
02:15
from 8,300' MD to 9,100' MD. MUT =
21.3 kftlbs. Filled pipe on the fly using
the Volant tool whilst topping off every
10th joint. Manually strapped trip pit
every 10 joints. Initial Breakover Wt =
265 klbs, P/U Wt = 255 klbs, and S/O
Wt = 138 klbs.
10/25/2019
10/25/2019
2.25
INTRM1
CASING
CIRC
P
Circulated at 9,100' MD. Slowly
9,100.0
9,100.0
02:15
04:30
staging up to 6 bpm w/ ICP = 440 psi
and FCP = 330 psi (11.3 ppg return
mud). Total strokes = 6,200 psi. P/U
Wt = 252 klbs, and S/O Wt = 142 klbs.
10/25/2019
10/25/2019
1.50
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 29.7 ppf TXP casing
9,100.0
10,100.0
04:30
06:00
from 9,100' MD to 10,100' MD. MUT =
21.3 kftlbs. Filled pipe on the fly using
the Volant tool whilst topping off every
10th joint. Manually strapped trip pit
every 10 joints. S/O Wt = 138 klbs.
10/25/2019
10/25/2019
4.75
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 29.7 ppf TXP casing
10,100.0
12,351.0
06:00
10:45
from 10,100' MD to 12,351' MD. MUT
= 21.3 kftlbs. Filled pipe on the fly
using the Volant tool whilst topping off
every 10th joint. Manually strapped
trip pit every 10 joints. P/U Wt = 310
klbs, and S/O Wt = 148 klbs.
10/25/2019
10/25/2019
0.75
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 29.7 ppf TXP casing
12,351.0
12,621.0
10:45
11:30
from 12,351' MD to 12,621' MD. MUT
= 21.3 kftlbs. Filled pipe on the fly
using the Volant tool whilst topping off
every 10th joint. Manually strapped
trip pit every 10 joints. P/U Wt = 310
klbs, and S/O Wt = 148 klbs.
10/25/2019
10/25/2019
3.00
INTRM1
CASING
CIRC
P
CBU at 12,621' MD. Reciprocated
12,621.0
12,621.0
11:30
14:30
pipe between 12,621' MD and 12,581'
MD. Staged up to 6 bpm w/ ICP =
349 psi and FCP = 307 psi (11.0 ppg
return mud). P/U Wt = 300 klbs, and
S/O Wt = 168 klbs.
10/25/2019
10/25/2019
1.00
INTRMI
CASING
PUTB
P
RIH w/ 7 5/8" 29.7 ppf Eagle casing
12,621.0
12,931.0
14:30
15:30
from 12,621' MD to 12,931' MD. MUT
= 20.0 kftlbs. Filled pipe on the fly
using the Volant tool whilst topping off
every 10th joint. Manually strapped
trip pit every 10 joints. P/U Wt = 316
klbs, and S/O Wt = 160 klbs.
10/25/2019
10/25/2019
2.50
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" X-O to TXP casing
12,931.0
14,135.0
15:30
18:00
from 12,931' MD to 14,135' MD. MUT
= 21.3 kftlbs. Filled pipe on the fly
using the Volant tool whilst topping off
every 10th joint. Manually strapped
trip pit every 10 joints. P/U Wt = 425
klbs, and S/O Wt = 152 klbs.
Page 17/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/25/2019
10/25/2019
3.00
INTRM1
CASING
PUTB
P
RIH w/ 7 5/8" 29.7 ppf TXP casing
14,135.0
15,161.0
18:00
21:00
from 14,135' MD to 15,161' MD. MUT
= 21.3 kftlbs. Filled pipe on the fly
using the Volant tool whilst topping off
every 10th joint. Manually strapped
trip pit every 10 joints. S/0 Wt = 117
klbs.
10/25/2019
10/25/2019
1.50
INTRM1
CASING
CIRC
P
Staged up pumps to 6 bpm. SPP =
15,161.0
15,161.0
21:00
22:30
430 psi, F/0 = 22%, and Total strokes
= 3,300
10/25/2019
10/25/2019
0.50
INTRM1
CASING
HOSO
P
M/U hanger and landing joint. Landed
15,161.0
15,281.0
22:30
23:00
hanger at 15,281' MD.
10/25/2019
10/26/2019
1.00
INTRM1
CEMENT
CIRC
P
Reciprocated pipe f/ 15,280' MD to
15,281.0
15,281.0
23:00
00:00
15,260' MD. Circulated to thin mud
down to 10.6 ppg, 6 bpm, F/0 = 22%,
SPP = 430 psi, Attained P/U Wt = 370
klbs once hole cleaned up. S/0 Wt =
126 klbs. Total strokes = 7,800 psi.
10/26/2019
10/26/2019
4.50
INTRM1
CEMENT
CIRC
P
Reciprocated pipe from 15,281' MD to
15,281.0
15,281.0
00:00
04:30
15,260' MD while circulating and thing
down the MW to 10.6 ppg. Staged
pumps up to 8 bpm. F/0 = 23%, SPP
= 595 psi, P/U Wt = 370 klbs, S/0 Wt
= 126 klbs, Total strokes = 25,600.
10/26/2019
10/26/2019
4.00
INTRMI
CEMENT
CMNT
P
PJSM. Blowed down top drive. R/U
15,281.0
15,281.0
04:30
08:30
cement and bleeder hose. Pressure
tested lines to 4,000 psi. Pumped 64
bbls of 13 ppg mud push at 4 bpm
( Pressure = 100-280 psi, F/0 = 17%).
Batch mixed cement. Dropped bottom
plug. Pumped 214 bbls of 15.8 ppg tail
cement ( Pressure = 320 psi, F/0 =
16%). Dropped top plug. Pumped 20
bbls water. Displaced 663 bbls (6,580
strokes, FCP = 360 psi, F/0 = 8%) w/
rig pumps to bump the plug and
pressure up to 900 psi (for 5 minutes).
B/O and checked floats.
Cement was in place at 0810hr.
10/26/2019
10/26/2019
2.00
INTRM1
CEMENT
WWSP
P
Set and tested 7 5/8" pack off to 5,000
15,281.0
15,281.0
08:30
10:30
psi.
10/26/2019
10/26/2019
1.50
INTRM1
CEMENT
CLEN
P
Cleaned and cleared rig floor of non-
15,281.0
15,281.0
10:30
12:00
essential tools.
10/26/2019
10/26/2019
2.75
INTRM1
CEMENT
BOPE
P
R/U to drill 6 1/2" production hole. C/O
0.0
0.0
12:00
14:45
saver sub, and pipe rams to 2 7/8" x 5
1/2" VBR's.
10/26/2019
10/26/2019
2.00
INTRM1
DRILLOUT
BHAH
P
PJSM. P/U BHA#3 from surface to
0.0
350.0
14:45
16:45
350' MD. P/U Wt = 47 klbs, and S/0
Wt = 55 klbs. Monitored returns on pit
#7.
10/26/2019
10/26/2019
2.75
INTRM1
DRILLOUT
PULD
P
RIH while picking up 4" XT39 drill pipe
350.0
2,230.0
16:45
19:30
from 350' MD to 2,230' MD. P/U Wt =
80 klbs, and S/0 Wt = 81 klbs.
Monitored returns on pit #7.
10/26/2019
10/26/2019
1.00
INTRM1
DRILLOUT
DHEQ
P
Filled pipe. Performed MWD shallow
2,230.0
2,230.0
19:30
20:30
hole test. GPM = 230 gpm and F/0 =
15%.
10/26/2019
10/26/2019
3.00
INTRM1
DRILLOUT
PULD
P
Continued to RIH while picking up 4"
2,230.0
4,880.0
20:30
23:30
XT39 drill pipe from 2,230' MD to
4,880' MD. P/U Wt = 90 klbs, and S/0
Wt = 91 klbs. Monitored returns on pit
#7. Filled pipe every 20 stands.
10/26/2019
10/27/2019
0.50
INTRM1
DRILLOUT
SVRG
P
Serviced top drive, blocks, and crown.
4,880.0
4,880.0
23:30
00:00
1
I
Page 18151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
. . .
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
10/27/2019
10/27/2019
5.00
INTRM1
DRILLOUT
PULD
P
Continued to RIH while picking up 4"
4,880.0
7,114.0
00:00
05:00
XT39 drill pipe from 4,880' MD to
7,114' MD. P/U Wt = 96 klbs, and S/O
Wt = 95 klbs. Monitored returns on pit
#2. Filled pipe every 20 stands.
10/27/2019
10/27/2019
1.00
INTRM1
DRILLOUT
SVRG
P
Inspected and maintained Top Drive.
7,114.0
7,114.0
05:00
06:00
10/27/2019
10/27/2019
3.00
INTRM1
DRILLOUT
RGRP
T
Changed out upper I-BOP.
7,114.0
7,114.0
06:00
09:00
10/27/2019
10/27/2019
2.00
INTRM1
WHDBOP
MPSP
P
PJSM. P/U storm packer. P/U Wt =
7,114.0
7,174.0
09:00
11:00
111 klbs, and S/O Wt = 98 klbs. RIH
60' and set packer in place.
10/27/2019
10/27/2019
1.00
INTRM1
WHDBOP
RURD
P
PJSM. Rig up to test BOPE w/ 4" test
7,174.0
7,174.0
11:00
12:00
joint.
10/27/2019
10/27/2019
3.00
INTRM1
WHDBOP
BOPE
P
Tested BOPE. All tests 250psi
7,174.0
7,174.0
12:00
15:00
low/3500psi high for 5 charted minutes
with exception of manual operated
and super chokes tested to
250/2000psi for 5 charted minutes.
Using 4" test jt, test annular, 2 7/8" x 5
1/2" UPR, 2 7/8" x 5 1/2" LPR. Test
choke valves 1-15, manual operated
and super choke, choke and kill
manuals and HCR's, 4" valve on kill
line, 4" FOSV, 4" dart valve, upper
and lower IBOP, and Blind/Shear
Rams. Perform Koomey drawdown,
ACC=2900psi, Manifold=1500psi,
ACCU=1650psi after all functions on
just bottles. 14 secs to 200psi build
with 2 electric pumps, 97 secs to build
to full system pressure with 2 electric
and 2 air pumps. Closing times,
annular=23 secs, UPR= 18 secs,
blind/shears= 16 secs, LPR= 16 sec,
Choke HCR= 2 sec, kill HCR = 2 sec.
Tested PVT gain/loss and flow alarms.
Tested LEL and H2S alarms.
Witnessed byAOGCC Rep: Jeff
Jones.
10/27/2019
10/27/2019
2.00
INTRM1
WHDBOP
RURD
P
Rigged down BOPE testing equipment
7,174.0
7,174.0
15:00
17:00
and set 6 7/8" wear ring.
10/27/2019
10/27/2019
1.50
INTRM1
WHDBOP
MPSP
P
PJSM. RIH to 60' with overshot
7,174.0
7,114.0
17:00
18:30
retrieval tool. Engaged overshot and
pulled storm packer. L/D storm packer.
10/27/2019
10/27/2019
0.75
INTRM1
DRILLOUT
SEQP
P
Blowed down choke manifold and
7,114.0
7,114.0
18:30
19:15
choke line. Removed PS-21's.
Installed master bushing.
10/27/2019
10/27/2019
0.75
INTRM1
DRILLOUT
FRZP
P
Freeze protect OA w/ 71 bbls diesel.
7,114.0
7,114.0
19:15
20:00
Final Shut in pressure = 625 psi.
SIMOPS: Adjust upper I-BOP actuator.
10/27/2019
10/28/2019
4.00
INTRM1
DRILLOUT
PULD
P
Continued to RIH while picking up 4"
7,114.0
9,884.0
20:00
00:00
XT39 drill pipe from 7,114' MD to
9,884' MD. P/U Wt = 125 klbs, and
S/O Wt = 114 klbs. Monitored returns
on pit #2. Filled pipe every 20 stands.
10/28/2019
10/28/2019
1.00
INTRMI
DRILLOUT
PULD
P
Continued to RIH while picking up 4"
9,884.0
10,300.0
00:00
01:00
XT39 drill pipe from 9,884' MD to
10,300' MD. P/U Wt = 126 klbs, and
S/O Wt = 115 klbs. Monitored returns
on pit #2.
Page 19151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/28/2019
10/28/2019
7.00
INTRM1
DRILLOUT
QEVL
P
Filled pipe and downlinked to LWD to
10,300.0
14,175.0
01:00
08:00
turn on SonicScope for logging
cement. Continued to RIH while
picking up 4" XT39 drill pipe from
10,300' MD to 14,175' MD at 1750 fph.
P/U Wt = 178 klbs, and S/O Wt = 123
klbs. Monitored returns on pit #2.
10/28/2019
10/28/2019
0.75
INTRM1
DRILLOUT
QEVL
P
Log R/Atag w/ GPM = 230 gpm, SPP
14,175.0
14,175.0
08:00
08:45
= 2,145 psi, Rotary = 60 rpm. Located
tag at 14,178' MD. Relocated it with no
rotation. GPM = 230 gpm, SPP =
2,144 psi, Relocated tag at 14,178'
MD.
10/28/2019
10/28/2019
1.75
INTRM1
DRILLOUT
QEVL
P
Continued to RIH while picking up 4"
14,175.0
15,022.0
08:45
10:30
XT39 drill pipe from 14,175' MD to
15,022' MD at 1750 fph (Logging
cement). P/U Wt = 178 klbs, and S/O
Wt = 124 klbs. Monitored returns on
pit #2.
10/28/2019
10/28/2019
1.00
INTRM1
DRILLOUT
CIRC
P
Circulated and conditioned mud at 240
15,022.0
15,022.0
10:30
11:30
gpm, SSP = 2,220 psi, Rotary = 50
rpm, and TQ = 7-8 kftlbs.
Reciprocated pipe 90'.
10/28/2019
10/28/2019
0.50
INTRM1
DRILLOUT
RURD
P
PJSM. Rigged up to test 7 5/8" casing.
15,022.0
15,022.0
11:30
12:00
10/28/2019
10/28/2019
0.75
INTRM1
DRILLOUT
PRTS
P
PJSM. Tested 7 5/8" casing to 3,500
15,022.0
15,022.0
12:00
12:45
psi for 30 minutes (Charted).Closed
UPR and pumped down DP and kill
line at 1 bpm. Pumped 80 strokes
(8.05 bbls) to full pressure. Bled back
7.8 bbls.
10/28/2019
10/28/2019
0.50
INTRM1
DRILLOUT
BHAH
P
Cleaned and cleared rig floor of non-
15,022.0
15,022.0
12:45
13:15
essential tools.
10/28/2019
10/28/2019
2.00
INTRMI
DRILLOUT
SLPC
P
Slipped and cut drill line (57 wraps).
15,022.0
15,022.0
13:15
15:15
448'.
10/28/2019
10/28/2019
1.75
INTRM1
DRILLOUT
COCF
P
Washed and reamed down to float
15,022.0
15,187.0
15:15
17:00
collar. From 15,022' MD to 15,187'
MD. GPM = 150 gpm, SPP = 978 psi,
Rotary = 50 rpm, TQ = 11.5 kftlbs, F/O
= 14%, P/U Wt = 182 klbs, and S/O
Wt = 126 klbs.
10/28/2019
10/28/2019
3.50
INTRM1
DRILLOUT
DRLG
P
Drilled shoe track and rat hole from
15,187.0
15,294.0
17:00
20:30
15,187' MD to 15,294' MD. GPM =
150 gpm, SPP = 978 psi, Rotary = 50
rpm, TQ = 11.5 kftlbs, F/O = 14%, P/U
Wt = 182 klbs, and S/O Wt = 126 klbs.
10/28/2019
10/28/2019
1.50
INTRM1
DRILLOUT
DDRL
P
Drilled 6 1/2" Production from 15,294'
15,294.0
15,314.0
20:30
22:00
MD to 15,314' MD (7,718' TVD). WOB
= 10 klbs, GPM = 200 gpm, SPP =
1,780 psi, Rotary = 60 rpm, TQ On =
13 kftlbs, TQ Off = 8 klbs, F/O = 19
%, ECD = 11.03 ppg, P/U Wt = 173
klbs, S/O Wt = 123 klbs, and Rot Wt =
139 klbs. ADT = 0.66 hrs, Total Bit
Hours = 0.66 hrs, and Total Jar Hours
= 84.62 hrs.
10/28/2019
10/29/2019
2.00
INTRM1
DRILLOUT
CIRC
P
L/D double. Circulated and
15,314.0
15,269.0
22:00
00:00
conditioned mud to 10.05 ppg in and
out. Rotated and reciprocated whilst
conditiong mud from 15,269' MD to
15,194' MD. GPM = 215 gpm, SPP =
1975 psi, Rotary = 50 rpm, TQ = 8
kftlbs, F/O = 19%, and total strokes =
5891.
Page 20/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/29/2019
10/29/2019
0.75
INTRM1
DRILLOUT
OWFF
P
SPR's. OWFF (Static). B/D top drive
15,269.0
15,269.0
00:00
00:45
and R/U for F.I.T.
10/29/2019
10/29/2019
0.75
INTRM1
DRILLOUT
FIT
P
Performed FIT to 1,000 psi w/ 10.05
15,269.0
15,314.0
00.45
01:30
ppg LSND. EMW for FIT was 12.5
ppg. R/D tested equipment. Blowed
down lines.
10/29/2019
10/29/2019
0.50
INTRM1
DRILLOUT
MPDA
P
Pulled trip nipple and installed MPD.
15,314.0
15,314.0
01:30
02:00
10/29/2019
10/29/2019
4.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 15,314'
15,314.0
15,405.0
02:00
06:00
MD to 15,405' MD (7,729' TVD). WOB
= 7 klbs, GPM = 240 gpm, SPP =
1,840 psi, Rotary = 100 rpm, TQ On =
9 kftlbs, F/O = 15 %, ECD = 9.93 ppg,
P/U Wt = 193 klbs, S/O Wt = 120 klbs,
and Rot Wt = 143 klbs. ADT = 2.77
hrs, Total Bit Hours = 3.43 hrs, and
Total Jar Hours = 87.39 hrs. MPD
connection back pressure = 0 psi.
Displaced to 9.0 ppg FloPro while
drilling. SIMOPS: L/D 5" DP from
derrick, and attempted to initialize
Novos but was unable to initialize.
10/29/2019
10/29/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 15,405'
15,405.0
16,070.0
06:00
12:00
MD to 16,070' MD (7,756' TVD). WOB
= 14 klbs, GPM = 240 gpm, SPP on =
1,970 psi, SPP off= 1,935 psi, Rotary
= 140 rpm, TQ On = 10 kftlbs, TQ Off
= 7 kftlbs, F/O = 15 %, ECD = 10.19
ppg, P/U Wt = 183 klbs, S/O Wt = 112
klbs, and Rot Wt = 142 klbs. ADT =
4.34 hrs, Total Bit Hours = 7.77 hrs,
and Total Jar Hours = 91.73 hrs. MPD
connection back pressure = 0 psi.
SIMOPS: L/D 5" DP from derrick and
used Novos as autodriller.
10/29/2019
10/29/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 16,070'
16,070.0
16,830.0
12:00
18:00
MD to 16,830' MD (7,762' TVD). WOB
= 12.5 klbs, GPM = 250 gpm, SPP on
= 2,093 psi, SPP off = 2,025 psi,
Rotary = 160 rpm, TQ On = 11-12
kftlbs, TQ Off = 7 kftlbs, F/O = 15
ECD = 10.43 ppg, P/U Wt = 178 klbs,
S/O Wt = 109 klbs, and Rot Wt = 148
klbs. ADT = 4.01 hrs, Total Bit Hours =
11.78 hrs, and Total Jar Hours = 95.74
hrs. MPD connection back pressure =
0 psi. Drilled with Novos slips to slips.
No soft speed as per SLB rep.
Page 21/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/29/2019
10/30/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 16,830'
16,830.0
17,590.0
18:00
00:00
MD to 17,590' MD (7,772' TVD). WOB
= 15 klbs, GPM = 260 gpm, SPP on =
2,648 psi, SPP off = 2,568 psi, Rotary
= 150 rpm, TQ On = 15 kftlbs, TQ Off
= 8 kftlbs, F/O = 16 %, ECD = 10.75
ppg, P/U Wt = 178 klbs, S/O Wt = 144
klbs, and Rot Wt = 144 klbs. ADT =
3.49 hrs, Total Bit Hours = 15.27 hrs,
and Total Jar Hours = 99.23 hrs. MPD
connection back pressure = 0 psi.
Drilled w/ Novos slips to slips. Two
stands Novos stopped drilling w/ 6' left
on stand and would not initialize
again. Novos was rebooted a second
time. No soft speed as per SLB rep.
Power Drive short hop transmission
stopped communicating w/ LWD at
17,010' MD. Decision was made to
resume drilling and monitor directional
responses moving forward. Power
Drive GR and Directional data are not
being transmitted, but the tool still
seems to be responding to directional
commands. LWD data is still
transmitting in real time.
10/30/2019
10/30/2019
2.50
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 17,590'
17,590.0
17,870.0
00:00
02:30
MD to 17,870' MD (7,777' TVD). WOB
= 13 klbs, GPM = 260 gpm, SPP on =
2,700 psi, Rotary = 150 rpm, TQ On =
14 kftlbs, TQ Off = 5 kftlbs, F/O = 17
%, ECD = 10.76 ppg, P/U Wt = 178
klbs, S/O Wt = 112 kibs, and Rot Wt =
144 klbs. MPD connection back
pressure = 0 psi.
10/30/2019
10/30/2019
1.00
PROD1
DRILL
OTHR
T
Troubleshooted Power Drive w/ anti-
17,870.0
17,870.0
02:30
03:30
jamming sweep. Attempted to send 60
second downlink w/ Novos (Incorrect
timing sequence format). Reverted to
Amphion to send the downlink.
10/30/2019
10/30/2019
2.50
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 17,870'
17,870.0
18,255.0
03:30
06:00
MD to 18,255' MD (7,777' TVD). WOB
= 14 klbs, GPM = 240 gpm, SPP on =
2,495 psi, SPP off = 2,415 psi, Rotary
= 150 rpm, TQ On = 14 kftlbs, TQ Off
= 5 kftlbs, F/O = 17 %, ECD = 10.8
ppg, P/U Wt = 181 klbs, S/O Wt = 113
klbs, and Rot Wt = 145 klbs. ADT =
3.13 hrs (0:00 - 06:00hr), Total Bit
Hours = 18.40 hrs, and Total Jar
Hours = 102.36 hrs. MPD connection
back pressure = 0 psi.
10/30/2019
10/30/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 18,255'
18,255.0
19,199.0
06:00
12:00
MD to 19,199' MD (7,785' TVD). WOB
= 19 klbs, GPM = 250 gpm, SPP on =
2,758 psi, SPP off = 2,485 psi, Rotary
150 rpm, TQ On = 16 kftlbs, TQ Off
= 8 kftlbs, F/O = 16 %, ECD = 11.1
ppg, P/U Wt = 177 klbs, S/O Wt = 108
klbs, and Rot Wt = 143 klbs. ADT =
3.52 hrs, Total Bit Hours = 21.92 hrs,
and Total Jar Hours = 105.88 hrs.
MPD connection back pressure = 0
psi. Drilling w/ Novos slips to slips.
SIMOPS: L/D 5" DP w/ 90' mouse
hole.
Page 22/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/30/2019
10/30/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 19,199'
19,199.0
20,051.0
12:00
18:00
MD to 20,051' MD (7,794' TVD). WOB
= 17 kibs, GPM = 255 gpm, SPP on =
2,970 psi, SPP off = 2,844 psi, Rotary
= 150 rpm, TQ On = 16 kftlbs, TQ Off
= 6 kftlbs, F/O = 16 %, ECD = 11.26
ppg, P/U Wt = 180 kibs, S/O Wt = 103
kibs, and Rot Wt = 143 klbs. ADT =
3.29 hrs, Total Bit Hours = 25.21 hrs,
and Total Jar Hours = 109.17 hrs.
MPD connection back pressure = 0
psi. Drilling w/ Novos slips to slips.
10/30/2019
10/30/2019
1.00
PROD1
DRILL
OTHR
T
Installed Novos and Stick Slip
20,051.0
20,051.0
18:00
19:00
Channel on Totco. Troubleshooted
installation and rebooted Totco.
10/30/2019
10/31/2019
5.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 20,051'
20,051.0
20,812.0
19:00
00:00
MD to 20,812' MD (7,802' TVD). WOB
= 18 klbs, GPM = 255 gpm, SPP on =
3,026 psi, SPP off = 2,850 psi, Rotary
= 150 rpm, TQ On = 15 kftlbs, TQ Off
= 8 kftlbs, F/O = 16 %, ECD = 11.19
ppg, P/U Wt = 179 klbs, S/O Wt = 101
kibs, and Rot Wt = 143 kibs. ADT =
3.26 hrs, Total Bit Hours = 28.47 hrs,
and Total Jar Hours = 112.43 hrs.
MPD connection back pressure = 0
psi.
10/31/2019
10/31/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 20,812'
20,812.0
21,580.0
00:00
06:00
MD to 21,580' MD (7,814' TVD). WOB
= 18 kibs, GPM = 260 gpm, SPP on =
3,320 psi, SPP off = 3,215 psi, Rotary
= 150 rpm, TQ On = 14 kftlbs, TQ Off
= 9 kftlbs, F/O = 16 %, ECD = 11.39
ppg, P/U Wt = 178 kibs, S/O Wt = 98
kibs, and Rot Wt = 139 kibs. ADT =
4.05 hrs, Total Bit Hours = 32.52 hrs,
and Total Jar Hours = 116.48 hrs.
MPD connection back pressure = 8
psi. Novos not in use due to update
03:00 - 12:00hr.
10/31/2019
10/31/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 20,580'
21,580.0
22,352.0
06:00
12:00
MD to 22,352' MD (7,827' TVD). WOB
= 15 kibs, GPM = 261 gpm, SPP on =
3,333 psi, SPP off = 3,261 psi, Rotary
= 160 rpm, TQ On = 16 kftlbs, TQ Off
= 9 kftlbs, F/O = 19 %, ECD = 11.67
ppg, P/U Wt = 178 klbs, S/O Wt = 92
kibs, and Rot Wt = 139 kibs. ADT =
4.20 hrs, Total Bit Hours = 36.72 hrs,
and Total Jar Hours = 120.68 hrs.
MPD connection back pressure = 12
psi. Novos not in use. Waiting on
update confirmation.
10/31/2019
10/31/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 22,352'
22,352.0
23,187.0
12:00
18:00
MD to 23,187' MD (7,832' TVD). WOB
= 18 kibs, GPM = 261 gpm, SPP on =
3,450 psi, SPP off = 3,393 psi, Rotary
= 160 rpm, TQ On = 15 kftlbs, TQ Off
= 9 kftlbs, F/O = 19 %, ECD = 11.73
ppg, P/U Wt = 184 kibs, S/O Wt = 86
klbs, and Rot Wt = 134 kibs. ADT =
4.13 hrs, Total Bit Hours = 40.85 hrs,
and Total Jar Hours = 124.81 hrs.
MPD connection back pressure = 14
psi. Troubleshooting new update on
Novos. Drilling w/Amphion.
Page 23/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
10/31/2019
10/31/2019
2.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 23,187'
23,187.0
23,375.0
18:00
20:00
MD to 23,375' MD (7,835' TVD). WOB
= 12 klbs, GPM = 255 gpm, SPP on =
3,182 psi, SPP off = 3,100 psi, Rotary
= 130 rpm, TQ On = 14 kftlbs, TQ Off
= 10 kftlbs, F/O = 19 %, ECD = 12.01
ppg, P/U Wt = 181 klbs, S/O Wt = 84
klbs, and Rot Wt = 135 klbs. MPD
connection back pressure = 10 psi.
Continued to troubleshoot new Novos
update. Drilled w/Amphion.
10/31/2019
10/31/2019
1.50
PROD1
DRILL
CIRC
T
Circulated while rotating and
23,375.0
23,375.0
20:00
21:30
reciprocating from 23,375' MD to
23,288' MD w/ GPM = 256 gpm, SPP
= 3,056 psi, F/O = 19%, Rotary = 130
rpm, TQ = 10 kftlbs, ECD = 12.1 - 10.9
ppg. Total pumped strokes = 3,687
due to high ECD's
10/31/2019
11/1/2019
2.50
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 23,375'
23,375.0
23,722.0
21:30
00:00
MD to 23,772' MD (7,835' TVD). WOB
= 13 klbs, GPM = 260 gpm, SPP on =
3,430 psi, SPP off = 3,284 psi, Rotary
= 150 rpm, TQ On = 14 kftlbs, TQ Off
= 10 kftlbs, F/O = 19 %, ECD = 11.99
ppg, P/U Wt = 176 klbs, S/O Wt = 80
klbs, and Rot Wt = 134 klbs. ADT =
3.45 hrs, Total Bit Hours = 44.3 hrs,
and Total Jar Hours = 128.26 hrs.
MPD connection back pressure = 10
psi. Continued to troubleshoot new
Novos update. Drilled w/ Amphion.
11/1/2019
11/1/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 23,772'
23,722.0
24,323.0
00:00
06:00
MD to 24,323' MD (7,842' TVD). WOB
= 9 klbs, GPM = 257 gpm, SPP on =
3,345 psi, SPP off = 3,240 psi, Rotary
= 150 rpm, TQ On = 15 kftlbs, TQ Off
= 10 kftlbs, F/O = 19 %, ECD = 11.3
ppg, P/U Wt = 179 klbs, S/O Wt = 85
klbs, and Rot Wt = 140 klbs. ADT =
4.57 hrs, Total Bit Hours = 48.87 hrs,
and Total Jar Hours = 132.83 hrs.
MPD connection back pressure = 15
psi. Continued to drill w/Amphion.
Waiting on Novos update.
11/1/2019
11/1/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 24,323'
24,323.0
24,988.0
06:00
12:00
MD to 24,988' MD (7,849' TVD). WOB
= 11 klbs, GPM = 257 gpm, SPP on =
3,360 psi, SPP off = 3,200 psi, Rotary
= 150 rpm, TQ On = 16 kftlbs, TQ Off
= 10 kftlbs, F/O = 19 %, ECD = 11.68
ppg, P/U Wt = 179 klbs, S/O Wt = 64
klbs, and Rot Wt = 137 klbs. ADT =
4.42 hrs, Total Bit Hours = 53.29 hrs,
and Total Jar Hours = 137.25 hrs.
MPD connection back pressure = 12
psi. Continued to drill w/ Amphion.
Waiting on Novos update.
Page 24/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/1/2019
11/1/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 24,988'
24,988.0
25,736.0
12:00
18:00
MD to 25,736' MD (7,849' TVD). WOB
= 11 klbs, GPM = 250 gpm, SPP on =
3,230 psi, SPP off = 3,110 psi, Rotary
= 130 rpm, TQ On = 15 kftlbs, TQ Off
= 10 kftlbs, F/O = 20 %, ECD = 11.28
ppg, P/U Wt = 186 klbs, S/O Wt = 53
klbs, and Rot Wt = 138 klbs. ADT =
3.67 hrs, Total Bit Hours = 56.96 hrs,
and Total Jar Hours = 140.92 hrs.
MPD connection back pressure = 12
psi. Drilled w/ Novos.
11/1/2019
11/2/2019
6.00
PROD1
DRILL
DDRL
P
Drilled 6 1/2" Production from 25,736'
25,736.0
26,480.0
18:00
00:00
MD to 26,480' MD (7,861' TVD). WOB
= 15 klbs, GPM = 250 gpm, SPP on =
3,320 psi, SPP off = 3,204 psi, Rotary
= 140 rpm, TQ On = 17 kftlbs, TQ Off
= 9.5 kftlbs, F/O = 18 %, ECD = 11.49
ppg, P/U Wt = 183 klbs, S/O Wt = 72
klbs, and Rot Wt = 160 klbs. ADT =
3.94 hrs, Total Bit Hours = 60.90 hrs,
and Total Jar Hours = 144.86 hrs.
MPD connection back pressure = 12
psi. Drilled w/ Novos.
11/2/2019
11/2/2019
1.50
PROD1
DRILL
DDRL
T
Drilled w/ Novos WOB limit = 18 klbs
26,480.0
26,480.0
00:00
01:30
and actual drilling was on 8 klbs. WOB
exceed the Novos limit at 21 klbs thus
resulting in loss of ROP and a sharp
increase in torque from 17 kftlbs to 22
kftlbs. Attempted to reset and continue
drilling a total of 4 times. Observed
some buckling. No ROP or footage
was made.
11/2/2019
11/2/2019
4.00
PROD1
DRILL
CIRC
T
Circulated and reciprocated from 26,
26,480.0
26,473.0
01:30
05:30
473' MD to 26,410' MD w/ GPM = 250
gpm, SPP = 3,200 psi, F/O = 17%,
Rotary = 50-100 rpm, TQ = 10 kftlbs,
ECD = 11.1 ppg, P/U Wt = 185 klbs,
S/O Wt = 77 klbs, Rot Wt = 143 klbs,
Total Pumped Strokes = 14,900.
Racked back one stand 4" DP in
Derrick after each bottoms up.
11/2/2019
11/2/2019
1.25
PROD1
DRILL
CIRC
T
P/U stand from Derrick and RIH from
26,473.0
26,476.0
05:30
06:45
to 26,476' MD. Rotary = 100 rpm,
GPM = 250 gpm, SPP = 3,150 psi,
F/O = 18%, TQ = 10-12 kftlbs, Set
WOB 25 klbs (no ROP). Downlinked
and set RSS to neutral. Racked back
stand.
11/2/2019
11/2/2019
0.25
PROD1
DRILL
OWFF
T
Fingerprinted well. Well was not
26,476.0
26,413.0
06:45
07:00
underbalance.
Mud weight 9.0+ shut on well with
108psi, open 15sec, shut in for 5min
build up to 18psi. Open choke 15sec.
shut in for 5 min. Opsi build up.
Plan kill fluid 9.4ppg brine for trip
margin.
11/2/2019
11/2/2019
5.00
PROD1
DRILL
BKRM
T
BROOH from 26,413' MD to 24,575'
26,413.0
24,575.0
07:00
12:00
MD w/ GPM = 250 gpm, SPP = 2,963
psi, Rotary = 80-120 rpm, TQ = 8-10
kftlbs, F/O = 15%, ECD = 10.55 ppg,
P/U Wt = 180 klbs, S/O Wt = 90 klbs,
and Rot Wt = 141 klbs.
Page 25/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/2/2019
11/2/2019
6.00
PROD1
DRILL
SMPD
T
Blowed down top drive and SOOH
24,575.0
19,200.0
12:00
18:00
from 24,575' MD to 19,200' MD w/ 4"
DP racked back in derrick. P/U Wt =
185 klbs. Monitored displacement on
pit #3.
11/2/2019
11/2/2019
3.50
PROD1
DRILL
SMPD
T
Continued to SOOH per schedule
19,200.0
15,180.0
18:00
21:30
from 19,200' MD to 15,180' MD w/ 4"
DP, racking back in the derrick. P/U
Wt = 185 klbs. Monitored
displacement on pit #3.
11/2/2019
11/3/2019
2.50
PROD1
DRILL
DISP
T
PJSM. Displaced well to 9.4 ppg KW
15,180.0
15,095.0
21:30
00:00
brine. Reciprocated from 15,194' MD
to 15,097' MD w/ GPM =250 gpm,
SPP = 865 psi, F/O = 14%, P/U Wt =
206 klbs, S/O Wt = 107 klbs, Total
Strokes = XXXX.
11/3/2019
11/3/2019
0.50
PROD1
DRILL
OWFF
T
OWFF (Static)
15,095.0
15,095.0
00:00
00:30
11/3/2019
11/3/2019
1.00
PROD1
DRILL
SLPC
T
PJSM. Slipped and cut 120' of drill line
15,095.0
15,095.0
00:30
01:30
(15 wraps).
11/3/2019
11/3/2019
0.50
PROD1
DRILL
SVRG
T
Lubricated top drive/blocks, and
15,095.0
15,095.0
01:30
02:00
calibrated blocks.
11/3/2019
11/3/2019
0.50
PROD1
DRILL
SMPD
T
SOOH from 15,180' MD to 14,610' MD
15,095.0
14,610.0
02:00
02:30
w/ 4" DP racking back in the derrick.
PU/Wt = 170 klbs and Monitored
displacement on pit #3.
11/3/2019
11/3/2019
1.50
PROD1
DRILL
DLOG
T
Reciprocated up and pumped in hole
14,610.0
14,230.0
02:30
04:00
whiile logging from 14,440' MD to
14,490' MD, and 14,185' MD (R/A pip
tag).
11/3/2019
11/3/2019
2.00
PROD1
DRILL
SMPD
T
SOOH from 14,230' MD to 11,180' MD
14,230.0
11,180.0
04:00
06:00
w/ 4" DP racking back in the derrick.
PU/Wt = 168 klbs and Monitored
displacement on pit #3.
11/3/2019
11/3/2019
6.00
PROD1
DRILL
SMPD
T
SOOH from 11,180' MD to 2,300' MD
11,180.0
2,300.0
06:00
12:00
w/ 4" DP racking back in the derrick.
PU/Wt = 82 klbs and Monitored
displacement on pit #3.
11/3/2019
11/3/2019
0.75
PROD1
DRILL
SMPD
T
SOOH from 2,300' MD to 980' MD w/
2,300.0
980.0
12:00
12:45
4" DP racking back in the derrick.
PU/Wt = 64 kibs and Monitored
displacement on pit #3.
11/3/2019
11/3/2019
0.50
PROD1
DRILL
BHAH
T
Found washout in the bottom ofjoint 7
980.0
980.0
12:45
13:15
and on the top ofjoint 6. L/D and
replaced both joints. P/U Wt = 64 klbs
and S/O Wt = 55 klbs.
11/3/2019
11/3/2019
0.75
PROD1
DRILL
SMPD
T
SOOH from 980' MD to 350' MD w/ 4"
980.0
350.0
13:15
14:00
DP racking back in the derrick. PU/Wt
= 64 klbs and Monitored displacement
on pit #3.
11/3/2019
11/3/2019
0.50
PROD1
DRILL
OWFF
T
OWFF (Static).
350.0
350.0
14:00
14:30
11/3/2019
11/3/2019
1.00
PROD1
DRILL
MPDA
T
Removed MPD bearing and installed
350.0
350.0
14:30
15:30
trip nipple.
11/3/2019
11/3/2019
2.50
PROD1
DRILL
BHAH
T
L/D #3 BHA from 350' MD to surface.
350.0
0.0
15:30
18:00
PU/Wt = 54 klbs and S/O Wt = 53
klbs. Monitored displacement on pit
#3.
11/3/2019
11/3/2019
1.00
PROD1
DRILL
BHAH
T
Cleaned and cleared rig floor of all
0.0
0.0
18:00
19:00
non-essential tools and equipment.
11/3/2019
11/3/2019
1.00
PROD1
WHDBOP
RURD
T
Drained stack, pulled wear ring, and
0.0
0.0
19:00
20:00
installed test plug as per FMC.
Page 26151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
StartTime
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operaflon
(WB)
End Depth (WB)
11/3/2019
11/3/2019
1.50
PROD1
WHDBOP
RURD
T
Rigged up to test BOPS.
0.0
0.0
20:00
21:30
11/3/2019
11/4/2019
2.50
PROD1
WHDBOP
BOPE
T
Tested BOPE. All tests 250psi
0.0
0.0
21:30
00:00
low/3500psi high for 5 charted minutes
with 4 1/2" test joint. 2 7/8" x 5 1/2"
UPR, 2 7/8" x 5 1/2" LPR. Test choke
valves 1-3, and 5-15, manual operated
and super choke, choke and kill
manuals and HCR's, 4" valve on kill
line, 4" FOSV, 4" dart valve, upper
and lower IBOP, and Blind/Shear
Rams. AOGCC Rep Matthew Herrera
waived witness on 11/2/2019 at
0836hr.
11/4/2019
11/4/2019
1.00
PROD1
WHDBOP
OTHR
T
[DST] Adjustment
0.0
00:00
01:00
11/4/2019
11/4/2019
2.50
PROD1
WHDBOP
BOPE
T
Tested BOPE. All tests 250psi
0.0
0.0
00:00
02:30
low/3,500psi high for 5 charted
minutes with w/ the exception of
manual operated and super choke
(2,000 psi/2minutes). 4" Test joint.
Tested annular, 2 7/8" x 5 1/2" UPR, 2
7/8" x 5 1/2" LPR. Test choke valve 4.
manual operated and super choke,
choke and kill manuals and HCR's.
Performed Koomey drawdown. ACC =
2,950 psi, Manifold = 1,550 psi„ ACC
= 1,575 psi after all functions on
bottles, 17 seconds for 200 psi. Built
pressure w/ 2 electric pumps, 103
seconds to build full system pressure
w/ 2 electric and 2 air pumps. Closing
time Annulars =23 sec. UPR = 18 sec.
Blind/shear rams = 16 sec. LPR = 16
sec. Choke HCR = 2 sec. Kill HCR = 2
sec. Test PVT gain/loss and flow out
alarms, Tested LEL and H2S alarms.
AOGCC rep Matthew Herrera waived
witness on 11/02/2019 at 0836hr.
11/4/2019
11/4/2019
1.00
PROD1
WHDBOP
RURD
T
Pulled test plug and L/D test joint.
0.0
0.0
02:30
03:30
Blowed down choke/kill lines, choke
manifold, top drive, and cleaned and
cleared rig floor. Installed wear ring.
11/4/2019
11/4/2019
0.50
PROD1
DRILL
SVRG
T
Serviced top drive, blocks, and crown.
0.0
0.0
03:30
04:00
11/4/2019
11/4/2019
2.00
PROD1
DRILL
SVRG
T
PM's rig floor, mud pumps, P/U and
0.0
0.0
04:00
06:00
function tested PS -21 slips,
11/4/2019
11/4/2019
4.25
PROD1
DRILL
SVRG
T
Continued with PM's and worked on
0.0
0.0
06:00
10:15
#1 mud pump. Installed PS -21's.
Inspected/serviced iron roughneck
and service skate.
11/4/2019
11/4/2019
1.00
PROD1
DRILL
BHAH
T
M/U milling BHA. Monitored
0.0
0.0
10:15
11:15
displacement on bit #3. P/U Wt = 50
klbs, S/O Wt = 50 klbs. Waited on junk
mill.
11/4/2019
11/4/2019
0.75
PROD1
DRILL
SVRG
T
Continued with PM's. C/O pressure
0.0
0.0
11:15
12:00
washer pump in BOP deck..
11/4/2019
11/4/2019
2.50
PROD1
DRILL
SVRG
T
Continued with PM's. C/O batteries on
0.0
0.0
12:00
14:30
MCW. Cleaned and maintained rig.
11/4/2019
11/4/2019
0.50
PROD1
DRILL
BHAH
T
Finished making up milling BHA from
0.0
295.0
14:30
15:00
87' MD to 295' MD. P/U Wt = 54 klbs,
and S/O Wt =55 klbs.
Page 27/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
...
')
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/4/2019
11/4/2019
3.00
PROD1
DRILL
TRIP
T
TIH w/ milling BHA from 295' MD to
295.0
4,041.0
15:00
18:00
4,041' MD w/ 4" DP from the derrick.
P/U Wt = 83 klbs, and S/O Wt =80
klbs. Monitored displacement on pit
#3. Filled pipe every 20 stands.
11/4/2019
11/5/2019
6.00
PROD1
DRILL
TRIP
T
TIH w/ milling BHA from 4,041' MD to
4,041.0
15,220.0
18:00
00:00
15,220' MD w/ 4" DP from the derrick.
P/U Wt = 173 klbs, and S/O Wt = 116
klbs. Monitored displacement on pit
#3. Filled pipe every 20 stands.
11/5/2019
11/5/2019
0.50
PROD1
DRILL
OWFF
T
OWFF at 15,220' MD (Static)
15,220.0
15,220.0
00:00
00:30
11/5/2019
11/5/2019
2.50
PROD1
DRILL
DISP
T
Circulate and displace 9.4ppg brine to
15,220.0
15,220.0
00:30
03:00
9.Oppg Flo-Pro. (75bbls interfase)
work string from 15,220' MD to 15,145'
MD 280gpm, Orpm, 1250psi, Flow
14%, P/U Wt = 194 klbs and S/O Wt =
97 klbs.
11/5/2019
11/5/2019
1.00
PROD1
DRILL
CIRC
T
Attempt to TIH from 15,220' MD,
15,220.0
15,290.0
03:00
04:00
tagged with 13k at 15,290' MD.
Circulate at 15,244' MD, 200gpm,
980psi, Flow 13%.
11/5/2019
11/5/2019
1.00
PROD1
DRILL
REAM
T
Attempt to TIH from 15,244' MD,
15,290.0
15,397.0
04:00
05:00
Tagged at 15,297' MD 30 klbs, Wash
and ream from through ledges at
15,297' MD and 15,397' MD with
20rpm 8klbs torque 80gpm 130psi Rot
Wt = 140 klbs.
11/5/2019
11/5/2019
1.00
PROD1
DRILL
TRIP
T
TIH w/ milling BHA on elevators from
15,397.0
16,297.0
05:00
06:00
15,397' MD to 16,297' MD w/ 4" DP
from the derrick. S/O Wt = 91 to 101
klbs. Monitored displacement on pit
#3. Filled pipe every 20 stands.
11/5/2019
11/5/2019
6.00
PROD1
DRILL
TRIP
T
TIH w/ milling BHA on elevators from
16,297.0
23,857.0
06:00
12:00
16,297' MD to 23,857' MD w/ 4" DP
from the derrick. S/O Wt =80 klbs.
Monitored displacement on pit #3.
Filled pipe every 20 stands.
Losses per tour=39bbls
11/5/2019
11/5/2019
2.25
PROD1
DRILL
TRIP
T
Cont. RIH w/ milling BHA from 23,857'
23,857.0
26,455.0
12:00
14:15
MD to 26,455' MD w/ 4" DP from the
derrick. S/O Wt = 67-74 klbs.
Monitored displacement on pit #3.
Filled pipe every 20 stands.
11/5/2019
11/5/2019
0.25
PROD1
DRILL
REAM
T
Wash and ream down with milling BHA
26,455.0
26,477.0
14:15
14:30
from 26,455'MD to 26,477' MDwith 6k
down, PU/SO wt 213/73k, RTG
wt=140k
11/5/2019
11/5/2019
3.50
PROD1
DRILL
MILL
T
Mill as per Baker rep from 26,477'MD
26,477.0
26,480.0
14:30
18:00
to 26,480.24 (Liklely pipe squat), 4-
6bpm, 1345-1616psi, 13%FO, 60-
80rpm, 10-12k TQ, 10-15k WOB, work
pipe as directed.
11/5/2019
11/5/2019
2.50
PROD1
DRILL
MILL
T
Continue to mill as per Baker rep from
26,480.0
26,480.0
18:00
20:30
26,480.24' MD to 26,480.35' MD,
gpm=42-175, psi=725-1240, FO=7-
15%, RPM=80, TQ=12-14k, WOB=15-
20k working pipe as directed.
Page 28151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/5/2019
11/6/2019
3.50
PROD1
DRILL
MILL
T
Continue to work mill as per Baker rep
26,480.0
26,480.0
20:30
00:00
from 26,480.35' MD-26,450MD,
gpm=252, psi=1700-2000 RPM=100-
130, TQ=12-14k, WOB=20k, work
pipe as directed. Observe increase in
torque at 25k WOB, TO 15-16K,
suspected bucklint of pipe at 25k
WOB. Continue milling at 20k WOB,
tq=12-13k ft -lbs. Resestablish initial
parameters, no depth change
observed.
OA@23:30=170psi
Losses for tour=45bbls
Cummulative hole section
losses=1046bbls
11/6/2019
11/6/2019
1.00
PROD1
DRILL
OWFF
T
Observe Well for Flow. (STATIC)
26,480.0
26,480.0
00:00
01:00
11/6/2019
11/6/2019
5.00
PROD1
DRILL
SMPD
T
SOOH from 26,480' MD to 22,036' MD
26,480.0
22,036.0
01:00
06:00
with 4" Drill Pipe. PU Wt: 211k1bs, SO
Wt = 79klbs; holding back pressure via
MPD, 85 psi in slips, 415 psi out of
slips.
11/6/2019
11/6/2019
6.00
PROD1
DRILL
SMPD
T
SOOH from 22,036' MD to 15,699' MD
22,036.0
15,699.0
06:00
12:00
with 4" Drill Pipe. PU Wt: 210klbs, SO
Wt = 87klbs; holding back pressure via
MPD, 85 psi in slips, 400 psi out of
slips.
Tour losses = 47 bbls
11/6/2019
11/6/2019
1.00
PROD1
DRILL
SMPD
T
SOOH from 15,699' MD to 15,194' MD
15,699.0
15,194.0
12:00
13:00
with 4" Drill Pipe. PU Wt: 206k1bs, SO
Wt = 107klbs; holding back pressure
via MPD, 85 psi in slips, 400 psi out of
slips.
11/6/2019
11/6/2019
2.50
PROD1
DRILL
DISP
T
Displace 9.0 ppg FloPro with 9.4 ppg
15,194.0
15,194.0
13:00
15:30
Brine. Circulate @ 215 gpm, 1565 psi,
10% Flow,
11/6/2019
11/6/2019
1.00
PROD1
DRILL
SLPC
T
Slip and cut drill line , 15 wraps (118'),
15,194.0
15,194.0
15:30
16:30
calibrate and service blocks, SIMOPS-
30min OWFF, monitor hole fill on Pit 3
11/6/2019
11/6/2019
1.50
PROD1
DRILL
SMPD
T
Continue SOOH from 15,097'-
15,194.0
13,125.0
16:30
18:00
13,125'MD, MPD holding 82psi in
slips, 360psi out of slips, FO=12%,
PU/SO Wt=204K/107k, monitor
displacement on pits 4 and 5
11/6/2019
11/7/2019
6.00
PROD1
DRILL
SMPD
T
Continue SOOH from 13,125'MD to
13,125.0
3,215.0
18:00
00:00
3,215'MD, MPD 82psi in slips, 140psi
out of slips, FO=12%,
PU/S0=93K/75K,
OA pressure=150psi
Tour losses=63bbls
Cumulative losses=1 1 56bbls
11/7/2019
11/7/2019
1.50
PROD1
DRILL
SMPD
T
Continue SOOH from 3,215' MD to
3,215.0
1,929.0
00:00
01:30
1,929' MD, L/D 4" drill pipe with bad
hard band. MPD 82psi in slips,
FO=12%, PU/SO=71 K/77K,
Floats not holding.
11/7/2019
11/7/2019
0.50
PROD1
DRILL
OWFF
T
OWFF (Static).
1,929.0
1,929.0
01:30
02:00
11/7/2019
11/7/2019
1.00
PROD1
DRILL
MPDA
T
Removed MPD bearing and installed
1,929.0
1,929.0
02:00
03:00
I
trip nipple.
Page 29/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/7/2019
11/7/2019
2.50
PROD1
DRILL
TRIP
T
POOH from 1,929' MD to 300' MD,
1,929.0
300.0
03:00
05:30
L/D 4" drill pipe with bad hard band.
PU/SO=70K/77K,
11/7/2019
11/7/2019
2.00
PROD1
DRILL
BHAH
T
LD BHA as per Baker rep. Clean and
300.0
0.0
05:30
07:30
inspect boot baskets and magnets and
mill/ PU/SO=60K/55K. 10lbs+ metal
on magnets, boot baskets clear, chunk
missing on boot basket shroud. Hard
metal wear on mill face.
11/7/2019
11/7/2019
0.50
PROD1
DRILL
BHAH
T
Clean and clearfloor- Service PS -21
0.0
0.0
07:30
08:00
slips
11/7/2019
11/7/2019
1.50
PROD1
DRILL
PULD
T
Pipe Management - RIH w/ 14 stds of
0.0
1,400.0
08:00
09:30
4" DP fr surface to 1400',
PU/SO=54k/55K, SIMOPS-Prep
doubles and strap and tally new 4" jts
11/7/2019
11/7/2019
2.50
PROD1
DRILL
PULD
T
POOH L/D total 73 culled singles to
1,400.0
0.0
09:30
12:00
pipe shed due to bad hardbanding.
Losses per tour=38bbls
OA annulus=140psi @ 8:00
11/7/2019
11/7/2019
1.50
PROD1
DRILL
BHAH
T
MU Milling Assembly BHA#5 as per
0.0
300.0
12:00
13:30
Baker Rep fr surface to 300'MD,
PU/SP=54K/53K
11/7/2019
11/7/2019
4.50
PROD1
DRILL
PULD
T
TIH from 300' to 3200'w/ 14 doubles
300.0
3,200.0
13:30
18:00
and 66 singles from pipeshed.
PU/SO=79K/66K, monitor holefill and
fill every 20 stads
11/7/2019
11/7/2019
5.50
PROD1
DRILL
TRIP
T
Continue TIH fr 3200' to 15,202'MD,
3,200.0
15,202.0
18:00
23:30
w/ 4" DP from derrick,
PU/SO= 1 74K/77K, monitor hole fill
and fill every 20 stds
11/7/2019
11/8/2019
0.50
PROD1
DRILL
OWFF
T
OWFF - Simops - PJSM for pulling trip
15,202.0
15,202.0
23:30
00:00
nipple and running RCD bearing, pull
PS -21's
Tour Losses=26bbls
Acc. Losses for hole section1221 bbls
11/8/2019
11/8/2019
0.50
PROD1
DRILL
MPDA
T
PJSM for pulling trip nipple and
15,202.0
15,202.0
00:00
00:30
running RCD bearing, pull PS -21's
11/8/2019
11/8/2019
2.00
PROD1
DRILL
DISP
T
Displace well 9.4ppg brine to 9.Oppg
15,202.0
15,202.0
00:30
02:30
FloPro, at 271 gpm 1250psi 14% flow
PU/SO= 180klbs/103klbs, 6,783 stks,
Blow down top drive.
11/8/2019
11/8/2019
3.50
PROD1
DRILL
SMPD
T
Strip in hole from 15,202' MD to
15,202.0
19,400.0
02:30
06:00
19,400' MD, w/ 4" DP from derrick,
PU/SO=198klbs/90klbs, monitor hole
fill and fill every 20 stds
11/8/2019
11/8/2019
6.00
PROD1
DRILL
SMPD
T
Continue Strip in hole from 19,400'
19,400.0
26,470.0
06:00
12:00
MD to 26,470' MD, w/ 4" DP from
derrick, PU/SO=212klbs/72klbs,
monitor hole fill and fill every 20 stds
11/8/2019
11/8/2019
0.25
PROD1
DRILL
WASH
T
Wash and ream from 26,470'MD-
26,470.0
26,477.0
12:00
12:15
26,477'MD, 4-6bpm, 1395-2150psi,
80rpm, 12k TQ, 15% FO. Break in
new bearing at 40rpm, prior to
washing down, tag bottom at
26,477'MD with 5K weight down.
11/8/2019
11/8/2019
5.75
PROD1
DRILL
MILL
T
Mill as per Baker rep Clint, 26,481'MD,
26,477.0
26,481.0
12:15
18:00
4-6bpm, 1395-2150psi, 80-140rpm, 12
-17k TQ, 15% FO, work pipe as
directed. No depth progress.
Page 30/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/8/2019
11/8/2019
1.50
PROD1
DRILL
MILL
T
Mill as per Baker rep Clint, 26,481'MD,
26,481.0
26,481.0
18:00
19:30
2-6bpm, 895-1410psi, 80-140rpm,
16K -18K TQ, 15% FO, W0B=16-18K,
work pipe as directed. No depth
progress.
11/8/2019
11/8/2019
0.50
PROD1
DRILL
RGRP
T
Serviced rig, changed out leaking
26,481.0
26,481.0
19:30
20:00
1washpipe.
11/8/2019
11/9/2019
4.00
PROD1
DRILL
MILL
T
Mill as per Baker rep Clint, 26,481'MD,
26,481.0
26,481.0
20:00
00:00
6bpm, 1410psi,140rpm, 16K -18K TQ,
15% FO, WOB=18K, work pipe as
directed. Worked and hit bottom hard
over 40 times, pumped two 25bbl hi -
vis nut plug sweeps. No depth
progress.
11/9/2019
11/9/2019
1.50
PROD1
DRILL
MILL
T
Mill as per Baker rep Clint, 26,481'MD,
26,481.0
26,481.0
00:00
01:30
6bpm, 1410psi,140rpm, 18klbs-20klbs
TQ, 15% FO, WOB= 1 8-20klbs, work
pipe as directed. No depth progress.
11/9/2019
11/9/2019
0.50
PROD1
DRILL
CIRC
T
Slow pump rates at 26,400' MD
26,481.0
26,481.0
01:30
02:00
7,860'TVD 9.2ppg mud
#1 pump 20spm 700psi 30spm 900psi
#2 pump 20spm 705psi 30spm 910psi
Flow check (static), Blow down top
drive
11/9/2019
11/9/2019
4.00
PROD1
DRILL
SMPD
T
SOOH from 26,481'MD to 23,180' MD
26,481.0
23,180.0
02:00
06:00
with 4" Drill Pipe. PU Wt: 215klbs;
holding back pressure via MPD, 50 psi
in slips, 320 psi out of slips.
11/9/2019
11/9/2019
6.00
PROD1
DRILL
SMPD
T
Continue SOOH from 23,180' MD to
23,180.0
17,955.0
06:00
12:00
17,955' MD with 4" Drill Pipe. PU
Wt=210klbs,holding back pressure via
MPD, 50 psi in slips, 320 psi out of
slips.
11/9/2019
11/9/2019
2.50
PROD1
DRILL
SMPD
T
Continue SOOH from 17,955' MD to
17,955.0
15,265.0
12:00
14:30
15,265' MD with 4" Drill Pipe. PU
Wt=196klbs, holding back pressure
via MPD, 50 psi in slips, 320 psi out of
slips.
11/9/2019
11/9/2019
2.25
PROD1
DRILL
DISP
T
Displace 9.0 ppg FloPro with 9.4 ppg
15,265.0
15,265.0
14:30
16:45
Brine @ 15,265' MD. Circulate @ 252
gpm, 935 psi, 15% Flow,
11/9/2019
11/9/2019
1.00
PROD1
DRILL
SLPC
T
Slip and cut 15 wraps (120'), calibrate
15,265.0
15,265.0
16:45
17:45
blocks-Simops OWFF (very little vac)
11/9/2019
11/9/2019
0.25
PROD1
DRILL
SMPD
T
Continue SOOH from 15,265' MD-
15,265.0
15,169.0
17:45
18:00
15,169'MD with 4" Drill Pipe. PU Wt:
196klbs; holding back pressure via
MPD, 50 psi in slips, 320 psi out of
slips.
11/9/2019
11/10/2019
6.00
PROD1
DRILL
SMPD
T
Continue, SOON, from 15,169'MD to
15,169.0
5,637.0
18:00
00:00
5,637'MD on MPD pressures 40psi in
slips/160psi out of slips, PU wt=120K
11/10/2019
11/10/2019
4.00
PROD1
DRILL
SMPD
T
Continue to SOOH 5,675'MD-
5,675.0
420.0
00:00
04:00
420'MD, MPD prtessures 50/420psi,
PU Wt=120k
11/10/2019
11/10/2019
0.25
PROD1
DRILL
OWFF
T
OWFF, SIMOPS=PJSM on pulling
420.0
420.0
04:00
04:15
RCD bearing and running trip nipple.
11/10/2019
11/10/2019
0.75
PROD1
DRILL
MPDA
T
Pull RCD bearing, install trip nipple
420.0
420.0
04:15
05:00
and fill line.
11/10/2019
11/10/2019
1.00
PROD1
DRILL
BHAH
T
Lay down milling BHA assembly from
420.0
200.0
05:00
06:00
420'-200'.
Page 31151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/10/2019
11/10/2019
0.75
PROD1
DRILL
BHAH
T
Continue laying down BHA. Some
200.0
0.0
06:00
06:45
metal recovered on magnets including
2 oz+junk sub piece. Mill tip good,
sand formation abrasion observed on
remaining surface and sides.
11/10/2019
11/10/2019
0.75
PROD1
DRILL
BHAH
T
Clean and clear rig floor. Prepare to
0.0
0.0
06:45
07:30
PU new RSS drilling BHA.
11/10/2019
11/10/2019
0.50
PROD1
DRILL
SVRG
T
Service top-drive, blocks, ST-80 iron
0.0
0.0
07:30
08:00
roughneck, and PS-21 slips.
11/10/2019
11/10/2019
2.00
PROD1
DRILL
BHAH
T
MU new RSS drilling BHA as per DD
0.0
350.0
08:00
10:00
from surface to 350'MD.
11/10/2019
11/10/2019
2.00
PROD1
DRILL
TRIP
T
TIH from 350' to 2,201'MD w/ 4",
350.0
2,201.0
10:00
12:00
shallow test Schlum tools, 250gpm,
1034psi, 15% FO, PU/SO=76K/63K.
Losses for tour=41 bbls
11/10/2019
11/10/2019
6.00
PROD1
DRILL
TRIP
T
Continue RIH from 2201' to 7811'.
2,201.0
7,811.0
12:00
18:00
PU/SO=1 1 3K/97K. Fill pipe every 20
stds, LD and swap in any bad hard
banded joits
11/10/2019
11/10/2019
1.75
PROD1
DRILL
TRIP
T
Continue RIH from 7,87to10,300'.
7,811.0
10,300.0
18:00
19:45
PU/SO=113K/97K. Fill pipe every 20
stds, LD and swap in any bad hard
banded joints.
11/10/2019
11/11/2019
4.25
PROD1
DRILL
TRIP
T
Pump to Downlink turn on and begin
10,300.0
13,050.0
19:45
00:00
Sonic logging down at 1,OOOfph from
10,300'MD to 13,050'MD. Monitor hole
displacement, fill every 20 stands, lay
down bad hard banded joints and
swap in good joints. SO wt= 112k at
11,950'MD.
Losses for tour=80bbls
Accumulated losses for hole
section= 1527bbls
OA Pressure = 140psi at 22:30 hrs
Culled Total of 13 joints, 4", 14ppf, bad
hardbanded joints
11/11/2019
11/11/2019
5.75
PROD1
DRILL
DLOG
T
Continue RIH while sonic scope
13,050.0
15,237.0
00:00
05:45
logging (memory) from 13,050'MD to
15,237'MD. GR circulating, slacking
off and rotating passes completed for
PIP tag confirmation, A sand depth
confirmation and sonic cement
evaluation. PIP at 14,178'MD slacking
off, 14,176'MD rotating. (Good
correlation to initial logged depth.)
11/11/2019
11/11/2019
1.00
PROD1
DRILL
SLPC
T
Slip and cut drill line, 5 wraps (44ft).
15,237.0
15,237.0
05:45
06:45
Calibrate Schlum Hookload and block
height. SIMOPS - OWFF
11/11/2019
11/11/2019
1.00
PROD1
DRILL
MPDA
T
Pull trip nipple and install RCD bearing
15,237.0
15,237.0
06:45
07:45
as per MPD. Function test MPD
chokes,
Conduct Weekly BOP Function test.
11/11/2019
11/11/2019
2.25
PROD1
DRILL
DISP
T
Displace well from 9.4ppg brine to
15,237.0
15,237.0
07:45
10:00
9.Oppg Flo Pro at 15,237'MD. 6bpm,
1760psi, 13% FO, PU/SO=113K/96K.
Gather SPR's.
Page 32/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
_. . CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/11/2019
11/11/2019
0.50
PR551
DRILL
DLOG
T
Continue sonic logging at 1,OOOfph,
15,237.0
15,423.0
10:00
10:30
from 15,237'MD to 15,423'MD.
PU/S0=113K/96K, Downlink to turn off
Schlum tools.
11/11/2019
11/11/2019
1.50
PROD1
DRILL
TRIP
T
RIH from 15,423'MD-16,913'MD, with
15,423.0
16,913.0
10:30
12:00
4" DP from derrick, PU/S0=113K/97K,
monitor displacement on trip tank.
11/11/2019
11/11/2019
6.00
PROD1
DRILL
TRIP
T
Continue RIH from 16,913'MD to
16,913.0
25,303.0
12:00
18:00
25,303'MD, PU/S0=212K/85K,
monitor displacement, fill pipe every
20 stds
Tour Losses=51 bbls
11/11/2019
11/11/2019
1.50
PROD1
DRILL
TRIP
T
Continue RIH from 25,203'MD-
25,303.0
26,439.0
18:00
19:30
26,439'MD, PU/S0=214K/92K,
monitor displacement, fill pipe every
20 stds
11/11/2019
11/11/2019
1.25
PROD1
DRILL
DHEQ
T
Perform Schlum Downlinks. Establish
26,439.0
26,480.0
19:30
20:45
drilling parameters and wash to
bottom. Observed tag up at 26,480'
with torque to 15K on bottom, 12K off
bottom 26,477'MD. Pump pressure
2920/2900psi on/off bottom,
PU/SO/RTG=214K/92K/139K lbs
11/11/2019
11/12/2019
3.25
PROD1
DRILL
DDRL
P
Drill 6 1/2" production hole from
26,480.0
26,721.0
20:45
00:00
26,480'MD-26,721'MD (7,862'TVD),
PSI=2930psi, RPM=100-140, On/Off
TQ=19K/12K, FO=16%,
ECD=10.65ppg,
P U /S O/RTG =214 K/93 K/ 139 K,
ADT=2.18hrs, Total bit HRS=2.18
Tour Losses=66bbls
11/12/2019
11/12/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6 1/2" production hole from
26,721.0
27,387.0
00:00
06:00
26,721' MD -27,387' MD (7,872'TVD),
WOB=17K, 260 gpm, PSI=3270psi,
RPM=100-140, On/Off TQ=21 K/1 8K,
FO=16%, ECD=11.32ppg,
PU/SO/RTG=200 K/87 K/140 K,
ADT=4.54hrs, Total bit HRS=6.72,
Jars=151.58hrs
11/12/2019
11/12/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6 1/2" production hole from
27,387.0
27,958.0
06:00
12:00
27,387' MD -27,958' MD (7,879'TVD),
WOB=17K, 270gpm PSI=3,430psi,
RPM= 80-100, On/Off TQ=20K/14K,
FO=16%, ECD=11.Oppg,
PU/SO/RTG=210K/76K/141 K,
ADT=4.26hrs, Total bit HRS=10.98,
Jars = 155.84hrs
Tour Losses=55bbls
11/12/2019
11/12/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6 1/2" production hole from
27,958.0
28,420.0
12:00
18:00
27,958' MD -28,420' MD (7,879'TVD),
WOB=17K, 270gpm, PSI=3,494psi,
RPM= 80-100, On/Off TQ=20K/14K,
FO=16%, ECD=11.16ppg,
PU/SO/RTG=201 K/NA/141 K, Pumped
30/30bbls, to/hi vis sweeps at
28,240'MD
ADT=3.92hrs, Total bit HRS=14.90,
Jars = 159.76
MPD@28,339'MD=5psi drilling,
closing chokes on connections build to
12psi, Max Peak Gas=80units
Page 33/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/12/2019
11/12/2019
5.00
PROD1
DRILL
DDRL
P
Drill 6 1/2" production hole from
28,420.0
28,815.0
18:00
23:00
28,420' MD, 28,815MD (7,882'TVD),
WOB=17K, 260gpm, PSI=3,275psi,
RPM= 100, On/Off TQ=21 K/1 4K,
FO=16%, ECD=10.95pp9,
P U/SO/RTG=200 K/NA/ 144 K,
ADT=3.12hrs, Total bit HRS=18.02,
Jars = 162.88
Tour Losses=86bbls
11/12/2019
11/13/2019
1.00
PROD1
DRILL
DDRL
T
Trouble shoot SLB tools. Lost signal to
28,815.0
28,815.0
23:00
00:00
tools. change mud pumps, add mud
dilution, cycle pumps.
11/13/2019
11/13/2019
0.50
PROD1
DRILL
DDRL
T
Continue dilution, trouble shoot MWD
28,815.0
28,815.0
00:00
00:30
signal transmission.
11/13/2019
11/13/2019
5.50
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
28,815.0
29,291.0
00:30
06:00
28,815'MD-29,291'MD (7,887'TVD),
WOB=17K, 270gpm, 3580psi,
100rpm, TQ on/off=21k/14k, 16% FO,
ECD=11.19ppg,
PU/SO/RTG=198K/NA/143K
MPD closing chokes on connections,
pumped 29/20bbls to -hi vis sweeps at
29,195'MD, Dump and Dilute 275bbls
at 28,816'MD.
ADT=3.54hrs, Total Bit=21.56hrs, Total
Jar=166.42hrs
11/13/2019
11/13/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
29,291.0
29,789.0
06:00
12:00
29,291'MD-29,789'MD (7,8917VD),
WOB=17K, 270gpm, 3482psi, 80rpm,
TQ on/off=21.5k/15k, 15% FO,
ECD=10.91 ppg,
P U/S O/ RTG=197 K/N A/ 143 K.
Pumped 30/30 to/hi vis sweeps at
29,673'MD.
MPD closing chokes on connections.
ADT=3.62hrs, Total Bit=25.18hrs, Total
Jar=170.04hrs
Mud Losses for 12 tour=73bbls
11/13/2019
11/13/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
29,789.0
30,340.0
12:00
18:00
29,789'MD-30,340'MD (7,897'TVD),
WOB=17K, 270gpm, 3482psi, 80rpm,
TQ on/off=21.5k/15k, 15% FO,
ECD=10.91 ppg,
P U /S O/RTG =197 K/ NA/ 143 K.
MPD closing chokes on connections.
ADT=3.70hrs, Total Bit=28.88hrs, Total
Jar=173.74hrs
Mud Losses for 12 tour=73bbls
11/13/2019
11/14/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
30,340.0
30,721.0
18:00
00:00
30,340'MD-30,721'MD (7,9007VD),
WOB=17K, 270gpm, 3760psi,
100rpm, TQ on/off=22K/15K, 15% FO,
ECD=11.18ppg,
P U/SO/RTG=205 K/NA/ 144 K.
MPD closing chokes on connections.
Pumped 30/30 to/hi vis sweeps at
30,721'MD.
ADT=3.34hrs, Total Bit=25.18hrs, Total
Jar=177.08hrs
Mud Losses for 12 tour= 100bbls
Page 34/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/14/2019
11/14/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
30,721.0
31,006.0
00:00
06:00
From 30,721' MD To 31,006'MD
(7,903'TVD), W013=17K, 270gpm,
3910psi, 100rpm, TQ on/off=22K/15K,
15% FO, ECD=11.22ppg,
P U/SO/RTG=205 K/NA/ 144 K.
MPD closing chokes on connections.
Pumped 20/20 to/hi vis sweeps at
30,721'MD.
ADT=1.93hrs, Total Bit=34.15hrs, Total
Jar=179,01 hrs
11/14/2019
11/14/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
31,006.0
31,483.0
06:00
12:00
From 31,006' MD To 31,483'MD
(7,907'TVD), W06=16K, 270gpm,
3835psi, 100rpm, TQ on/off=22K/15K,
15% FO, ECD=11.29ppg,
P U/SO/RTG=205 K/NA/ 144 K.
MPD closing chokes on connections.
ADT=3.38hrs, Total Bit=37.53hrs, Total
Jar=182.39hrs
Mud Losses for 12 tour=140bbls
11/14/2019
11/14/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
31,483.0
31,803.0
12:00
18:00
From 31,483' MD To 31,803'MD
(7,914'TVD), W013=16K, 270gpm,
3850psi, 100rpm, TQ on/off=22K/15K,
15% FO, ECD=11.22ppg,
PU/SO/RTG=205K/NA/144K.
MPD closing chokes on connections.
ADT=2.47hrs, Total Bit=40.00hrs,
Jars=184.56hrs
11/14/2019
11/15/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
31,803.0
32,246.0
18:00
00:00
From 31,803'MD-32,246'MD
(7,920'TVD), W013=18K, 270gpm,
4055psi, 90rpm, TQ on/off=23K/15K,
15% FO, ECD=11.44ppg,
P U/S O/ RTG=206 K/ N A/ 142 K.
MPD closing chokes on connections.
ADT=3.40hrs, Total Bit=43.40hrs,
Jars=188.26hrs
Mud Losses for 12 tour=123bbls
11/15/2019
11/15/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
32,246.0
32,627.0
00:00
06:00
From 32,246' MD-32,627'MD
(7,924'TVD), WOB=18K, 2709pm,
3760psi, 90rpm, TQ on/off=23K/15K,
15% FO, ECD=11.34ppg,
P U/S O/ RTG=204 K/ N A/ 144 K.
MPD closing chokes on connections.
ADT=3.03hrs, Total Bit=46.43hrs,
Jars=191.29hrs
Page 35/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/15/2019
11/15/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
32,627.0
33,007.0
06:00
12:00
From 32,627' MD-33,007'MD
(7,925'TVD), WO6=18K, 270gpm,
3960psi, 90rpm, TQ on/off=23K/15K,
15% FO, ECD=11.36ppg,
P U/SO/RTG=209 K/NA/ 144 K.
MPD closing chokes on connections.
ADT=2.81 hrs, Total Bit=49.24hrs,
Jars=194.10hrs
Mud Losses for 12 tour=181 bbls
11/15/2019
11/15/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
33,007.0
33,420.0
12:00
18:00
From 33,007' MD-33,420'MD
(7931 'TVD), W0B=13K, 270gpm,
4053psi, 90rpm, TQ on/off=23K/16K,
14% FO, ECD=11.26ppg,
P U/SO/RTG=224K/NA/148 K.
MPD closing chokes on connections.
ADT=3.63hrs, Total Bit=52.87hrs,
Jars=197.73hrs.
275bbls dump and dilute 9.Oppg at
33,102'MD
11/15/2019
11/15/2019
5.50
PROD1
DRILL
DDRL
P
Continue to drill 6 1/2" production hole
33,420.0
33,768.0
18:00
23:30
From 33,420'MD-33,768"MD
(7943 -TVD), WOB=14K, 270gpm,
4032psi, 90rpm, TQ on/off=22K/16K,
14% FO, ECD=11.16ppg,
P U/SO/RTG=224K/NA/148K.
MPD closing chokes on connections.
ADT=2.92hrs, Total Bit=55.79hrs,
Jars=200.65hrs.
FINAL TD REACHED 33,768'MD
(7943 -TVD)
11/15/2019
11/16/2019
0.50
PROD1
CASING
CIRC
P
Pump 30bbIsHV sweep, power down
33,768.0
33,768.0
23:30
00:00
Schlumberger tools as per DD.
Circulate and condition mud at
270gpm, 4000psi, 80rpm, FO=14%,
ECD=11.25.prior to Fingerprint
Drawdown, final bottoms up and
BROCK
11/16/2019
11/16/2019
4.25
PROD1
CASING
CIRC
P
Continue C&C, rotate and reciprocate,
33,767.0
33,677.0
00:00
04:15
33,767@270gpm, 4020psi, 80rpm,
148K rtg wt, 14%FO.
11.25ppg ECD, 13,030 total strokes.
Rack back stand, fingerprint MPD
Build ups at 33,677'MD, Initial capture
220psi, BU's 80, 37, 15, 6 psi,
formation balanced or less.
11/16/2019
11/16/2019
2.75
PROD1
CASING
CIRC
P
Circ BU, rtg and circ. 33,677'MD-
33,677.0
33,580.0
04:15
07:00
33,580' MD, 270gpm, 4025psi, 14%
FO, 120rpm (for better hole cleaning),
19.5k TQ, 11.16ppg ECD, 148k rtg wt
BROOH @ 33,360'= 500'/hr.
Page 36/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
_ CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/16/2019
11/16/2019
5.00
PROD1
CASING
BKRM
P
BROOH 33580'MD - 32,341'MD,
33,580.0
32,341.0
07:00
12:00
270gpm, 3870psi, 80rpm, 17K TQ,
14%FO, 11.1 ppg ECD, PU/SO/RTG
wt's 212K/NA/149K
Dropped 2.30" Hollow drift with 120'
wire tail.
BROOH @ 32,900'= 7507hr.
Tour Losses=136bbl
11/16/2019
11/16/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 32,341'MD-30,437'MD,
32,341.0
30,437.0
12:00
18:00
270gpm, 3630psi, 80rpm, 17K TQ,
14% FO, 10.89ppg ECD,
PU/RTG=206K/143K.
BROOH @ 31,780'= 10007hr.
BROOH @ 31,200'= 12507hr
BROOH @ 30,800'= 15007hr
11/16/2019
11/17/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 30,437'MD-27,770'MD,
30,437.0
27,770.0
18:00
00:00
270gpm, 3425psi, 80rpm, 16K TQ,
14% FO, 10.82ppg ECD,
PU/RTG=204K/142K.
Attempt to Strip in the hole at
28,000MD, still no down weight
available.
116bbis-Losses this tour
11/17/2019
11/17/2019
4.00
PROD1
CASING
BKRM
P
BROOH from 27,770'MD-26,445'MD,
27,770.0
26,445.0
00:00
04:00
270gpm, 3325psi, 80rpm, 15.5K TQ,
14%FO, 10.80ppg ECD, At
26,445'MD, blow down top -drive,
grease washpipe ready to SOOH.
1 st attempt to Strip in the hole at
27,000'MD, no go with 68K down
weight, 142K rtg wt
PU wt=224k lbs at 25,600'MD.
11/17/2019
11/17/2019
2.00
PROD1
CASING
SMPD
P
SOOH from 26,445' MD-24,924'MD
26,445.0
24,924.0
04:00
06:00
with 4" Drill Pipe. PU Wt: 224klbs;
holding back pressure via MPD, 80 psi
in slips, 211 psi out of slips @ 15007hr
Max overpull 5klbs.
11/17/2019
11/17/2019
6.00
PROD1
CASING
SMPD
P
SOOH from 24,924' MD-18,617'MD
24,924.0
18,617.0
06:00
12:00
with 4" Drill Pipe. PU Wt: 207k1bs; SO
Wt: 95klbs. holding back pressure via
MPD, 80 psi in slips, 260 psi out of
slips@ 25007hr.
Tour losses=71bbls
11/17/2019
11/17/2019
1.50
PROD1
CASING
SMPD
P
SOOH from 18,617'MD-17,446'MD
18,617.0
17,446.0
12:00
13:30
with 4" Drill Pipe. PU Wt: 206klbs; SO
Wt: 94klbs. holding back pressure via
MPD, 80 psi in slips, 260 psi out of
slips
11/17/2019
11/17/2019
2.50
PROD1
CASING
DISP
P
Hold PJSM, displace 9.Oppg Flo Pro
17,446.0
17,446.0
13:30
16:00
mud to 9.5ppg brine, 250gpm,
1643psi, 50rpm, 9K TQ, 10% FO,
PU/SO=199K/88K, total 7945stks
11/17/2019
11/17/2019
0.50
PROD1
CASING
OWFF
P
OWFF (static)
17,446.0
17,446.0
16:00
16:30
11/17/2019
11/17/2019
1.50
PROD1
CASING
SMPD
P
SOOH from 17,446'MD-16,119'MD
17,446.0
16,119.0
16:30
18:00
with 4" Drill Pipe. PU Wt: 208klbs; SO
Wt: 101 klbs. holding back pressure via
MPD, 80 psi in slips, 260 psi out of
slips
Page 37/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment
Job:
DRILLING
ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftK8)
11/17/2019
11/17/2019
1.75
PROD1
CASING
SMPD
P
SOOH from 16,119'MD-15,150'MD
16,119.0
15,150.0
18:00
19:45
with 4" Drill Pipe. PU Wt: 208klbs; SO
Wt: 101 klbs. holding back pressure via
MPD, 80 psi in slips, 260 psi out of
slips
11/17/2019
11/17/2019
1.25
PROD1
CASING
SLPC
P
Inside 7 5/8" int. casing shoe, Slip and
15,150.0
15,150.0
19:45
21:00
Cut Drill Line (164'), SIMOPS - OWFF
for 10 min, calibrated Amphion/Totco,
11/17/2019
11/18/2019
3.00
PROD1
CASING
SMPD
P
SOOH from 15,150'MD-11,450'MD
15,150.0
11,450.0
21:00
00:00
with 4" Drill Pipe. PU Wt: 170klbs; SO
Wt: 100k1bs. holding back pressure via
MPD, 170gpm going thru MPD choke,
80 psi in slips, 260 psi out of slips,
FO=10%
11/18/2019
11/18/2019
6.00
PROM
CASING
SMPD
P
SOOH 15,150'MD-4,844'MD, MPD at
11,450.0
4,844.0
00:00
06:00
170gpm, out of slips 260psi, in
slips=80psi, FO=10%,
PU/SP=115K/98K, laying down culled
bad hard banded DP as identified.
Total jts laid down=31 so far.
11/18/2019
11/18/2019
6.00
PROM
CASING
SMPD
P
SOOH 4,844'MD-445'MD, under MPD
4,844.0
445.0
06:00
12:00
at 170gpm, out of slips 260psi, in
slips=80psi, FO=10%,
PU/SP=52K/56K, laying down culled
bad hard banded DP as identified.
Laid out total of 102jts, 56 culled for
hardbanding (total 88 outside) and 28
jts left in pipe shed magazines.
11/18/2019
11/18/2019
0.50
PROM
CASING
OWFF
P
OWFF before pulling RCD bearing.
445.0
445.0
12:00
12:30
11/18/2019
11/18/2019
1.00
PROM
CASING
MPDA
P
PJSM, pull RCD bearing.
445.0
445.0
12:30
13:30
11/18/2019
11/18/2019
3.00
PROM
CASING
BHAH
P
PJSM, LD BHA from 445' -surface.
445.0
0.0
13:30
16:30
11/18/2019
11/18/2019
0.75
PROM
CASING
BHAH
P
Clear and clean rig floor on non-
0.0
0.0
16:30
17:15
essential BHA equipment and tools.
11/18/2019
11/18/2019
1.75
PROM
WHDBOP
RURD
P
R/U to Test BOP's.
0.0
0.0
17:15
19:00
Page 38/51
Report Printed:
12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/18/2019
11/19/2019
5.00
PROD1
WHDBOP
BOPE
P
Test BOP's, 250 low/3500psi high for
0.0
0.0
19:00
00:00
all charted with exception of manual
operated and super choke tested to
250/2000psi for charted 5 minutes.
Using 4" test joint, tested annular, 2
7/8" x 5 1/2" UPR, with 4 1/2" test
joint, tested 2 7/8" x 5 1/2" UPR, and 2
7/8" x 5 1/2" LPR, tested choke valves
1-15, manual operated and super
choke, choke and kill manuals and
HCR's, 4" valve on kill line, 4" FOSV,
4" dart valve, upper and lower IBOP,
blind shear rams, perform Koomey
drawdown, ACC=3000psi,
manifold= 1550psi. Acc=1600psi after
all functions on bottles only,Average
pressure remaining on 6
bottles=1908psi. 14 sec's to build
200psi, with 2 electric pumps, 102secs
to full system pressure with 2 electric
and 2 air pumps. Closing times,
annular=23secs, UPR=18secs,
blind/shear rams= 16secs,
LPR=16secs, choke HCR=2 sec's, kill
HCR=2sec, tested PVT gain/loss and
flow out alarms, LEL and 1-12S alarms.
AOGCC witness waived by Jeff Jones
06:47 11-16-2019 - BOP Testing
operations completed 01:00, 11-19-
2019
11/19/2019
11/19/2019
1.00
PROD1
WHDBOP
BOPE
P
Completed BOP testing, All primary
0.0
0.0
00:00
01:00
and secondary BOPE controls,
Koomey and driller's station were
tested. All tests passed initial
inspection.
11/19/2019
11/19/2019
0.50
PROD1
WHDBOP
RURD
P
Rig down testing equipment and blow
0.0
0.0
01:00
01:30
down top drive, test pump, kill line,
choke line, choke manifold and gas
buster.
11/19/2019
11/19/2019
0.75
PROD1
WHDBOP
MPSP
P
Pull test plug, install wear ring as per
0.0
0.0
01:30
02:15
FMC rep, RILDS on 6.875" wear ring.
Line up hole fill and fill BOP stack. 14
bbls to fill.
11/19/2019
11/19/2019
3.75
COMPZ1
CASING
PULD
P
Make up ported bull nose to avoid
0.0
3,115.0
02:15
06:00
damage to HWDP pin end, pick up
and makeup 96 singles of 4" HWDP
from shed and rack in derrick for liner
running string weight. Drift all on the
skate with 2.3" drift and manually strap
displacement every 9 joints.
PU/SO= 1 04k/84K at 3125'.
11/19/2019
11/19/2019
2.00
COMPZI
CASING
TRIP
P
POOH on elevators, from 3,115' to
3,115.0
0.0
06:00
08:00
surface.
11/19/2019
11/19/2019
0.50
COMPZ1
CASING
RURD
P
R/U to run 4.5", 12.6 ppf, L80, Hyd
0.0
0.0
08:00
08:30
563 Frac liner as per detail.
11/19/2019
11/19/2019
3.50
COMPZI
CASING
PUTB
P
Conduct team PJSM in the office , run
0.0
2,032.0
08:30
12:00
4 1/2", 12.6 ppf, L-80, Hyd 563A
lateral liner, from surface to 2,032',
PU/SP wts= 59K/66K.
Losses for tour=58bbls,
OA pressure=160psi.
Page 39151 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/19/2019
11/19/2019
6.00
COMPZ1
CASING
PUTB
P
Pick-up and run 4 1/2", 12.6 ppf, L-80,
2,032.0
7,516.0
12:00
18:00
Hyd 563 A lateral liner, from 2,032'MD-
7,516'MD, PU/SO wts= 101 K/87K.
Monitor hole displacement.
11/19/2019
11/20/2019
6.00
COMPZ1
CASING
PUTB
P
Pick-up and run 4 1/2", 12.6 ppf, L-80,
7,516.0
13,155.0
18:00
00:00
Hyd 563 A lateral liner, from 7,516'MD-
13,155'MD, PU/SOwts= 118K/101K.
Monitor hole displacement.
Losses=20bbls for tour
11/20/2019
11/20/2019
6.00
COMPZ1
CASING
PUTB
P
Continued to TIH w/ "A" Lateral 4.5"
13,155.0
18,128.0
00:00
06:00
12.6ppf L-80 H563 frac liner from
13,155' MD to 18,128' MD. P/U Wt =
171 klbs, and S/0 Wt = 98 klbs.
Monitored displacement on pit #4.
Gathered circulating parameters while
at the shoe at 15,220' MD: 1 bpm =
124 psi, 1.5 bpm = 145 pis, and 2 bpm
= 170 psi. A total of 6.5 bbls of volume
was pumped. Attempted to rotate at 5
k (Not successful). P/U Wt = 162 klbs,
S/0 Wt = 99 klbs.
11/20/2019
11/20/2019
1.00
COMPZ1
CASING
PUTB
P
Continued to TIH w/ "A" Lateral 4.5"
18,128.0
19,102.0
06:00
07:00
12.6ppf L-80 H563 frac liner from
18,128' MD to 19,102' MD. P/U Wt =
172 klbs, and S/0 Wt = 97 klbs.
Monitored displacement on pit #4.
11/20/2019
11/20/2019
1.50
COMPZ1
CASING
OTHR
P
PJSM. M/U Hanger and Seal Bore
19,102.0
19,188.0
07:00
08:30
Extension (X/0 to DP) from 19,102'
MD to 19, i 88' MD. P/U Wt = 172 klbs,
S/0 Wt = 97 klbs, Rot Wt = 156 klbs,
Rotary= 10 rpm,. Monitored
displacement on pit #4.
11/20/2019
11/20/2019
3.50
COMPZ1
CASING
RUNL
P
Continued to TIH on DP w/ "A" Lateral
19,188.0
22,577.0
08:30
12:00
4.5" 12.6ppf L-80 H563 frac liner from
19,188' MD to 22,577' MD. P/U Wt =
183 klbs, and S/0 Wt = 93 klbs.
Monitored displacement on pit #4.
11/20/2019
11/20/2019
3.00
COMPZ1
CASING
RUNL
P
Continued to TIH on 14 ppf 4" DP from
22,577.0
26,276.0
12:00
15:00
the derrick from 22,577' MD to 26,276'
MD. Monitored displacement on pit
#4.
11/20/2019
11/20/2019
3.00
COMPZ1
CASING
RUNL
P
Continued to TIH on 15.7 ppf 4" DP
26,276.0
28,380.0
15:00
18:00
from the derrick from 26,276' MD to
28,380' MD. P/U Wt = 210 klbs.
Monitored displacement on pit #4.
Encountered tight spot at 28,380' MD.
Attempted to work through at GPM =
84 gpm, SPP = 700 psi, Rotary = 10
rpm, and TQ = 13 kftlbs.
11/20/2019
11/20/2019
2.00
COMPZ1
CASING
RUNL
T
Worked through tight spot at 28,380'
28,380.0
28,380.0
18:00
20:00
MD. Pumped 84-126 gpm w/ SPP =
710-968 psi, Rotary 2-0-30 rpm. Broke
through tight spot and attempted to
TIH on elevators w/ no success.
Attempted to pump in hole with no
success. P/U Wt = 214 klbs, S/0 Wt =
42 klbs, and Rot = 143 klbs.
Page 40/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/20/2019
11/21/2019
4.00
COMPZ1
CASING
RUNL
P
Rotated 4 1/2" liner in hole from
28,380.0
29,775.0
20:00
00:00
28,380' MD to 29,775' MD w/ 5 stands
of 4" HWDP from the derrick followed
by 15.7 ppf 4" DP. Rotary = 20 rpm,
GPM = 84 gpm, SPP = 675 psi, and
TQ = 12-15kftlbs. Worked pipe
through tight spots.
Note* filled active w/ 9.0 ppg FloPro
and displaced drillstring on the fly
while rotating pipe down.
11/21/2019
11/21/2019
6.00
COMPZ1
CASING
RUNL
P
Rotated 4 1/2" liner in hole from
29,775.0
32,035.0
00:00
06:00
28,775' MD to 32,035' MD w/ stands
of 15.7 ppf 4" DP and 4" HWDP.
Rotary = 20 rpm, GPM = 84 gpm, SPP
= 775 psi, and TQ = 12-15kftlbs. Rot
Wt = 149 klbs. 26 bph loss rate at 2
bpm while rotating string in hole.
Note* filled active w/ 9.0 ppg FloPro
and displaced drillstring on the fly
while rotating pipe down.
11/21/2019
11/21/2019
5.00
COMPZ1
CASING
RUNL
P
Rotated 4 1/2" liner in hole from
32,035.0
33,725.0
06:00
11:00
32,035' MD to 33,725' MD w/ stands
of 15.7 ppf 4" DP and 4" HWDP.
Rotary = 20 rpm, GPM = 84 gpm, SPP
= 775 psi, and TQ = 16 kftlbs. Rot Wt
= 131 klbs.
Note* filled active w/ 9.0 ppg FloPro
and displaced drillstring on the fly
while rotating pipe down.
11/21/2019
11/21/2019
1.50
COMPZ1
CASING
HOSO
P
Dropped 1.5" setting ball. Pumped
33,725.0
33,735.0
11:00
12:30
down at 84 gpm w/ 900 psi. Ball set at
1,085 strokes. Pressured up to 2,500
psi to set hanger. Sat down 50 klbs to
confirm that the hanger was set.
Pressured up to 4,000 psi to release.
P/U to string weight 204 klbs + 5'. Set
down 50 klbs to set packer in place.
P/U to string weight 204 klbs + 5'.
Rotated at 15 rpm (TQ = 7.5 kftlbs)
and sat down 50 klbs to ensure weight
transfer.
Liner set in place at 33,735' MD.
Top of Liner is at 14,593' MD.
11/21/2019
11/21/2019
1.00
COMPZ1
CASING
PACK
P
Tested liner top packer to 2,500 psi
33,735.0
33,735.0
12:30
13:30
(Charted). Total strokes = 38.
11/21/2019
11/21/2019
0.75
COMPZ1
WELLPR
OWFF
P
OWFF (Static).
33,735.0
33,735.0
13:30
14:15
11/21/2019
11/21/2019
3.75
COMPZ1
WELLPR
TRIP
P
POOH from 14,394' MD to 10,877' MD
14,394.0
10,877.0
14:15
18:00
w/ 4" DP (Racking back in the derrick).
P/U Wt = 159 klbs. Monitored
displacement on trip tanks.
11/21/2019
11/21/2019
5.75
COMPZ1
WELLPR
TRIP
P
POOH from 10,877' MD to 154' MD w/
10,877.0
154.0
18:00
23:45
4" DP (Racking back in the derrick).
P/U Wt = 145 klbs @ 8,000' MD.
Monitored displacement on trip tanks.
11/21/2019
11/22/2019
0.25
COMPZ1
WELLPR
BHAH
P
PJSM. L/D liner running tool.
154.0
0.0
23:45
00:00
Maintained constant hole fill over the
top and monitored trip pit before and
after BHA.
11/22/2019
11/22/2019
1.50
COMPZ1
WELLPR
BHAH
P
L/D liner hanger running tools.
0.0
0.0
00:00
01:30
1
I
I
I
Cleaned and cleared the rig floor.
Page 41/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/22/2019
11/22/2019
1.25
PROD2
WHPST
SLPC
P
PJSM. Slipped and cut drill line
0.0
0.0
01:30
02:45
(133717 wraps). Calibrated Amphion
and Totco. Unspooled additional line
from spooler for new spool install.
11/22/2019
11/22/2019
3.25
PROD2
WHPST
BHAH
P
PJSM. P/U Whipstock BHA.
0.0
0.0
02:45
06:00
Maintained constant hole fill over the
top using the jet pump and monitored
returns on Pit #4.
11/22/2019
11/22/2019
1.00
PROD2
WHPST
BHAH
P
PJSM. Continued picking up
0.0
328.0
06:00
07:00
Whipstock/Milling BHA from surface to
328' MD. P/U Wt = 57 klbs, S/O Wt =
62 klbs. Monitored displacement w/ pit
#4.
11/22/2019
11/22/2019
5.00
PROD2
WHPST
TRIP
P
PJSM.TIH w/ Whipstock/Milling BHA
328.0
6,594.0
07:00
12:00
from 328' MD to 6,594' MD. P/U Wt =
111 klbs, S/O Wt = 93 klbs. Monitored
displacement w/ pit #4.
11/22/2019
11/22/2019
4.00
PROD2
WHPST
TRIP
P
PJSM.TIH w/ Whipstock/Milling BHA
6,594.0
11,535.0
12:00
16:00
from 6,594' MD to 11,535' MD. P/U Wt
= 159 klbs, S/O Wt = 121 klbs.
Monitored displacement w/ pit #4.
11/22/2019
11/22/2019
1.00
PROD2
WHPST
RURD
P
C/O Saver Sub.
11,535.0
11,535.0
16:00
17:00
11/22/2019
11/22/2019
1.00
PROD2
WHPST
TRIP
P
PJSM.TIH w/ Whipstock/Milling BHA
11,535.0
12,542.0
17:00
18:00
from 11,535' MD to 12,542' MD. P/U
Wt = 171 klbs, S/O Wt = 127 klbs.
Monitored displacement w/ pit #4.
11/22/2019
11/22/2019
1.50
PROD2
WHPST
TRIP
P
TI w/ Whipstock/Milling BHA from
12,542.0
14,392.0
18:00
19:30
12,542' MD to 14,392' MD w/ 4" from
derrick. P/U Wt = 200 klbs, S/O Wt =
154 klbs. Monitored displacement w/
pit #4. Logged R/Atag at 14,180' MD.
11/22/2019
11/22/2019
1.50
PROD2
WHPST
WPST
P
Filled pipe. Oriented whipstock to 44°
14,392.0
14,593.0
19:30
21:00
R GTF. Tagged no go at 14,593' MD.
Set 15 klbs downwards. P/U 15 klbs
over (X2). Set 30 klbs down to shear
the bolt on milling assembly.
Top of Whipstock = 14369'
Bottom of Whipstock = 14383'
11/22/2019
11/22/2019
0.50
PROD2
WHPST
PRTS
P
Tested packer to 1,000 psi for 10
14,593.0
14,593.0
21:00
21:30
minutes. B/D kill line and shut
manuals for milling.
11/22/2019
11/23/2019
2.50
PROD2
WHPST
MILL
P
Mill 6 1/2" window out of 7 5/8" casing
14,369.0
14,373.0
21:30
00:00
from 14369' MD to 14,373' MD. WOB
= 3-5 klbs, GPM = 300 gpm, PSI on =
2,550 psi, Rotary = 80 rpm, TQ On = 6
-13 kftlbs, Flow Out = 11 %,
11/23/2019
11/23/2019
4.00
PROD2
WHPST
MILL
P
Mill 6 1/2" window out of 7 5/8" casing
14,373.0
14,394.0
00:00
04:00
from 14,373' MD to 14,394' MD (7,614'
TVD). WOB = 3-5 klbs, GPM = 300
gpm, PSI on = 2,550 psi, Rotary = 80-
100 rpm, TQ On = 6-13 kftlbs, Flow
Out= 11 %, P/U Wt = 201 klbs, S/O
Wt = 155 klbs, and Rot Wt = 201 klbs.
Pumped 30 bbls Super Sweep.
11/23/2019
11/23/2019
1.50
PROD2
WHPST
MILL
P
Worked milling BHA through window
14,394.0
14,394.0
04:00
05:30
w/ 100 rpm (X4), No rotation (X2), No
Pump and Rotation (X2). Blown down
top drive.
11/23/2019
11/23/2019
0.50
PROD2
WHPST
OWFF
P
Pulled into casing and OWFF (Static).
14,394.0
14,351.0
05:30
06:00
Page 42/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/23/2019
11/23/2019
0.75
PROD2
WHPST
TRIP
P
PJSM. POOH from 14,351' MD to
14,351.0
14,069.0
06:00
06:45
14,069' MD w/ 4" DP (Racking back in
the derrick). P/U Wt = 204 klbs, and
S/O Wt = 156 klbs. Monitored
displacement on pit #4.
11/23/2019
11/23/2019
3.75
PROD2
WHPST
PULD
P
PJSM. POOH while L/D 4" HWDP
14,069.0
11,514.0
06:45
10:30
singles to pipe shed from 14,069' MD
to 11,514' MD. P/U Wt = 160 klbs, and
S/O Wt = 123 klbs. Monitored
displacement on pit #4.
11/23/2019
11/23/2019
1.50
PROD2
WHPST
TRIP
P
PJSM. POOH from 11,514' MD to
11,514.0
8,465.0
10:30
12:00
8,465' MD w/ 4" DP (Racking back in
the derrick). P/U Wt = 128 klbs, and
S/O Wt = 104 klbs. Monitored
displacement on trip tank.
11/23/2019
11/23/2019
3.50
PROD2
WHPST
TRIP
P
PJSM. POOH from 8,465' MD to 198'
8,465.0
198.0
12:00
15:30
MD w/ 4" DP (Racking back in the
derrick). P/U Wt = 56 klbs, and S/0 Wt
= 59 klbs. Monitored displacement on
trip tank.
11/23/2019
11/23/2019
1.00
PROD2
WHPST
BHAH
P
PJSM. L/D Milling BHA from 198' MD
198.0
0.0
15:30
16:30
to surface. Monitored displacement on
trip tank.
11/23/2019
11/23/2019
1.50
PROD2
WHPSTWWWH
P
M/U Stack washer w/ magnets and
0.0
0.0
16:30
18:00
flushed stack.
11/23/2019
11/23/2019
2.00
PROD2
WHPSTJPULD
BHAH
P
M/U 6 1/2" Kick Off BHA #8 from
0.0
557.0
18:00
20:00
surface to 557'.
11/23/2019
11/23/2019
2.50
PROD2
WHPST
P
Single in 4" DP the hole (From pipe
557.0
1,970.0
20:00
22:30
shed) from 557' MD to 1,970' MD.
11/23/2019
11/23/2019
0.50
PROD2
WHPST
DHEQ
P
Shallow tested MWD (Good). GPM =
1,970.0
1,970.0
22:30
23:00
220-270 gpm, SPP = 720-900 psi, and
F/0 = 7-13%
11/23/2019
11/24/2019
1.00
PROD2
WHPST
TRIP
P
TIH from 1,970' MD to 4,602' MD w/ 4"
1,970.0
4,602.0
23:00
00:00
DP from the derrick. Filled pipe every
20 stands. P/U Wt = 91 klbs, and S/O
Wt = 89 klbs. Monitored displacement
on pit #4.
11/24/2019
11/24/2019
5.50
PROD2
WHPST
TRIP
P
TIH from 4,602' MD to 14,299' MD w/
4,602.0
14,299.0
00:00
05:30
4" DP from the derrick. Filled pipe
every 20 stands. P/U Wt = 168 klbs,
and S/O Wt = 120 klbs. Monitored
displacement on pit #4.
11/24/2019
11/24/2019
0.50
PROD2
WHPST
TRIP
P
Oriented BHA 40 degrees to the right.
14,299.0
14,392.0
05:30
06:00
Shut pumps and tripped through the
window. Tagged up at 14,392' MD.
11/24/2019
11/24/2019
4.00
PROD2
DRILL
DDRL
P
Drilled to Kick Off and land in zone
14,392.0
14,450.0
06:00
10:00
from 14,392' MD to 14,450' MD. WOB
= 7 klbs, GPM = 250 gpm, SPP On =
1700 psi, Rotary = 40 rpm, TQ On =
7.5 kftlbs, F/O = 13%, P/U Wt = 179
klbs, S/O Wt = 122 klbs, RT Wt = 144
klbs. ADT = 3.68 hrs. AST = 1.44 hrs.
and ART = 2.24 hrs
11/24/2019
11/24/2019
2.00
PROD2
DRILL
CIRC
P
CBU. Pumped 40 bbl sweep. TOtal
14,450.0
14,450.0
10:00
12:00
strokes 6,200.
11/24/2019
11/24/2019
0.50
PROD2
DRILL
OWFF
P
OWFF (Static).
14,450.0
14,450.0
12:00
12:30
11/24/2019
11/24/2019
5.50
PROD2
DRILL
TRIP
P
PJSM. POOH from 14,450' MD to
14,450.0
2,001.0
12:30
18:00
2,001 MD w/ 4" DP racked back in the
derrick. P/U Wt = 74 klbs, S/O Wt = 80
klbs, Monitored displacement on trip
tank.
Page 43/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (ftKB)
11/24/2019
11/24/2019
1.00
PROD2
DRILL
TRIP
P
POOH from 2,001' MD to 557' MD w/
2,001.0
557.0
18:00
19:00
4" DP racked back in the derrick.
Monitored displacement on trip tank.
11/24/2019
11/24/2019
0.50
PROD2
DRILL
OWFF
P
OWFF (Static).
557.0
557.0
19:00
19:30
11/24/2019
11/24/2019
1.50
PROD2
DRILL
BHAH
P
L/DBHA #8.
557.0
0.0
19:30
21:00
11/24/2019
11/24/2019
0.50
PROD2
DRILL
BHAH
P
Clean and clear rig floor.
0.0
0.0
21:00
21:30
11/24/2019
11/24/2019
0.50
PROD2
DRILL
SFTY
P
PJSM for slip and cut.
0.0
0.0
21:30
22:00
11/24/2019
11/25/2019
2.00
PROD2
DRILL
SLPC
P
Slip and cut 1,995' of drill line (New
0.0
0.0
22:00
00:00
Spool).
11/25/2019
11/25/2019
1.00
PROD2
DRILL
SLPC
P
Slipped and cut drill line.
0.0
0.0
00:00
01:00
11/25/2019
11/25/2019
0.50
PROD2
DRILL
SVRG
P
Serviced top drive, blocks, crown, and
0.0
0.0
01:00
01:30
calibrated blocks. SIMOPS: P/U BHA
components to rig floor.
11/25/2019
11/25/2019
0.50
PROD2
DRILL
BHAH
P
P/U BHA to rig floor.
0.0
0.0
01:30
02:00
11/25/2019
11/25/2019
2.00
PROD2
DRILL
BHAH
P
M/U RSS BHA#9 from surface to 337'
0.0
337.0
02:00
04:00
MD.
11/25/2019
11/25/2019
2.00
PROD2
DRILL
TRIP
P
TIH from 337' MD to 2,213' MD w/ 4"
337.0
2,213.0
04:00
06:00
DP from derrick. Monitored
displacement on pit #4. P/U Wt = 76
klbs, and S/O Wt = 82 klbs.
11/25/2019
11/25/2019
6.00
PROD2
DRILL
TRIP
P
TIH from 2,213' MD to 11,688' MD w/
2,213.0
11,668.0
06:00
12:00
4" DP from derrick. Monitored
displacement on pit #4. P/U Wt = 157
klbs, and S/O Wt = 117 klbs. Filled
pipe every 20 stands.
11/25/2019
11/25/2019
2.50
PROD2
DRILL
TRIP
P
TIH from 11,688' MD to 14,172' MD w/
11,668.0
14,172.0
12:00
14:30
4" DP from derrick. Monitored
displacement on pit #4. P/U Wt = 173
klbs, and S/O Wt = 121 klbs. Filled
pipe every 20 stands.
11/25/2019
11/25/2019
0.75
PROD2
DRILL
DLOG
P
Washed down and logged R/Atag
14,172.0
14,267.0
14:30
15:15
from 14,172' MD to 14,267' MD. GPM
= 240 gpm, and SPP = 1,779 psi. R/A
tag observed at 14,180' MD.
11/25/2019
11/25/2019
0.75
PROD2
DRILL
MPDA
P
PJSM. Removed trip nipple and
14,267.0
14,267.0
15:15
16:00
installed RCD bearing.
11/25/2019
11/25/2019
1.00
PROD2
DRILL
TRIP
P
TIH from 14,267' MD to 14,450' MD w/
14,267.0
14,450.0
16:00
17:00
4" DP from derrick. Monitored
displacement on pit #4. P/U Wt = 178
klbs, and S/O Wt = 120 klbs.
11/25/2019
11/25/2019
1.00
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
14,450.0
14,512.0
17:00
18:00
14,450' MD to 14,512' MD (7,633'
TVD), WOB = 15 klbs, GPM = 255
gpm, SPP on = 1,933 psi, Rotary =
100 rpm, TQ on = 10 kftlbs, F/O = 6%,
ECD = 9.91 ppg, P/U Wt = 178 klbs,
S/O Wt = 120 klbs, and Rot Wt = 146
klbs. MPD connection back pressure =
0 psi. ADT = 0.59 hrs, and Jar Time =
4.27 hrs.
Page 44/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
. O.A.
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/25/2019
11/26/2019
6.00
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
14,512.0
15,091.0
18:00
00:00
14,512' MD to 15,091' MD (7,631'
TVD), WOB = 15 klbs, GPM = 260
gpm, SPP on = 2,112 psi, Rotary =
100 rpm, TQ on = 10 kftlbs, F/O = 6%,
ECD = 10.09 ppg, P/U Wt = 165 klbs,
S/O Wt = 108 klbs, and Rot Wt = 150
klbs. MPD connection back pressure =
0 psi. ADT = 4.46 hrs, and Jar Time =
8.14 hrs.
11/26/2019
11/26/2019
6.00
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
15,091.0
15,690.0
00:00
06:00
15,091' MD to 15,690' MD (7,624'
TVD), WOB = 14 klbs, GPM = 259
gpm, SPP on = 2,296 psi, Rotary = 80
rpm, TQ on = 10-12 kftlbs, F/O = 12%,
ECD = 10.31 ppg, P/U Wt = 170 klbs,
S/O Wt = 114 klbs, and Rot Wt = 146
klbs. ADT = 4.03 hrs, Bit Hours = 8.49
and Jar Time = 12.17 hrs. MPD
connection back pressure = 0 psi.
Pumped Anti -Jamming sweep.
11/26/2019
11/26/2019
6.00
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
15,690.0
16,408.0
06:00
12:00
15,690' MD to 16,408' MD (7,629'
TVD), WOB = 15 klbs, GPM = 260
gpm, SPP on = 2,352 psi, Rotary = 80
rpm, TQ on = 10-11 kftlbs, F/O = 14%,
ECD = 10.29 ppg, P/U Wt = 175 klbs,
S/O Wt = 114 klbs, and Rot Wt = 142
klbs. ADT = 4.34 hrs, Bit Hours =
12.83 and Jar Time = 16.59 hrs. MPD
connection back pressure = 0 psi.
Pumped Anti -Jamming sweep.
11/26/2019
11/26/2019
6.00
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
16,408.0
17,155.0
12:00
18:00
16,408' MD to 17,155' MD (7,630'
TVD), WOB = 19 klbs, GPM = 270
gpm, SPP on = 2,595 psi, Rotary = 90
rpm, TQ on = 12 kftlbs, F/O = 14%,
ECD = 10.38 ppg, P/U Wt = 175 klbs,
S/O Wt = 112 klbs, and Rot Wt = 144
klbs. ADT = 3.98 hrs, Bit Hours =
16.81 and Jar Time = 20.49 hrs. MPD
connection back pressure = 0 psi.
Pumped Anti -Jamming sweep.
11/26/2019
11/27/2019
6.00
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
17,155.0
17,635.0
18:00
00:00
17,155' MD to 17,635' MD (7,632'
TVD), WOB = 11 klbs, GPM = 270
gpm, SPP on = 2,630 psi, Rotary = 90
rpm, TQ on = 11 kftlbs, TQ off= 7
kftlbs, F/O = 13%, ECD = 10.3 ppg,
P/U Wt = 170 klbs, S/O Wt = 111 klbs,
and Rot Wt = 145 klbs. ADT = 2.71
hrs, Bit Hours = 19.52 and Jar Time =
23.2 hrs. MPD connection back
pressure = 0 psi. Pumped Anti -
Jamming sweep.
11/27/2019
11/27/2019
3.50
PROD2
DRILL
DDRL
P
Drilled 6 1/2" production hole from
17,635.0
17,932.0
00:00
03:30
17,635' MD to 17,932' MD (7,634'
TVD), WOB = 18 klbs, GPM = 270
gpm, SPP on = 2,650 psi, Rotary = 80
rpm, TQ on = 10-12 kftlbs, TQ off= 8
kftlbs, F/O = 14%, ECD = 10.25 ppg,
P/U Wt = 175 klbs, S/O Wt = 109 klbs,
and Rot Wt = 146 klbs. ADT = 3.2 hrs,
Bit Hours = 23.36 and Jar Time =
27.04 hrs. MPD connection back
pressure = 0 psi.
Page 45151 Report Printed: 12/31/2019
-` Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/27/2019
11/27/2019
1.50
PROD2
CASING
CIRC
P
Obtained survey. Circulated, rotated
17,932.0
17,930.0
03:30
05:00
and reciprocated pipe from 17,930'
MD to 17,870' MD w/ GPM = 270
gpm, SPP = 2,630 psi, F/O = 13%,
ROM 70 rpm, TQ = 8 kftlbs, and ECD
= 10.21 ppg, P/U Wt = 175 klbs, S/O
Wt = 109 klbs, and Rot Wt = 146 klbs.
11/27/2019
11/27/2019
0.50
PROD2
CASING
OWFF
P
Fingerprinting (Static).
17,930.0
17,930.0
05:00
05:30
11/27/2019
11/27/2019
4.50
PROD2
CASING
CIRC
P
CBU while racking back stands after
17,930.0
17,582.0
05:30
10:00
each bottoms up from 17,930' MD to
17,582' MD w/ GPM = 270 gpm, SPP
= 2,630 psi, F/O = 13%, ROM 70 rpm,
TQ = 8 kftlbs, and ECD = 10.23 ppg,
P/U Wt = 181 klbs, S/O Wt = 108 klbs,
and Rot Wt = 142 klbs.
11/27/2019
11/27/2019
2.00
PROD2
CASING
DISP
P
PJSM. Displaced well at 17,582' MD
17,582.0
17,582.0
10:00
12:00
to 9.5 ppg KW Brine. Rotated and
reciprocated 90'w/ GPM = 268 gpm,
ICP = 2,449 psi, FCP = 1,994 psi,
Rotary = 60 rpm, and TQ = 7.5 kftlbs.
P/U Wt = 184 klbs, S/O Wt = 110 klbs,
and Rot Wt = 140 klbs.
11/27/2019
11/27/2019
0.50
PROD2
CASING
OWFF
P
OWFF (Static).
17,582.0
17,582.0
12:00
12:30
11/27/2019
11/27/2019
3.50
PROD2
CASING
SMPD
P
SOOH f/ 17,582' MD to 14,207' MD w/
17,582.0
14,207.0
12:30
16:00
4" DP L/D doubles in the pipe shed.
P/U Wt = 183 klbs, S/O Wt = 119 klbs,
In Slips = 50 psi, Out of Slips = 80 psi.
Monitored displacement on pit #4.
11/27/2019
11/27/2019
0.50
PROD2
CASING
MPDA
P
PJSM. OWFF. Pulled RCD bearing
14,207.0
14,207.0
16:00
16:30
and installed trip nipple.
11/27/2019
11/27/2019
1.50
PROD2
CASING
PULD
P
PJSM. POOH f/ 14,207' MD to 13,090'
14,207.0
13,090.0
16:30
18:00
MD w/ 4" DP L/D doubles in the pipe
shed. P/U Wt = 179 klbs, and S/O Wt
= 11 klbs, Monitored displacement on
pit #4.
11/27/2019
11/27/2019
4.00
PROD2
CASING
PULD
P
PJSM. POOH f/ 13,090' MD to 9,751'
13,090.0
9,751.0
18:00
22:00
MD w/ 4" DP L/D doubles in the pipe
shed. P/U Wt = 150 klbs, and S/O Wt
= 115 klbs, Monitored displacement on
pit #4.
11/27/2019
11/28/2019
2.00
PROD2
CASING
PULD
P
PJSM. POOH f/ 9,751' MD to 8,592'
9,751.0
8,592.0
22:00
00:00
MD w/ 4" DP L/D singles in the pipe
shed. P/U Wt = 135 klbs, and S/O Wt
= 105 klbs, Monitored displacement on
pit #4.
11/28/2019
11/28/2019
6.00
PROD2
CASING
PULD
P
POOH f/ 8,592' MD to 3,996' MD w/
8,592.0
3,996.0
00:00
06:00
4" DP L/D singles in the pipe shed.
P/U Wt = 87 klbs, and S/O Wt = 83
klbs, Monitored displacement on pit
#4.
11/28/2019
11/28/2019
3.50
PROD2
CASING
PULD
P
POOH f/ 3,996' MD to 430' MD w/ 4"
3,996.0
430.0
06:00
09:30
DP L/D singles in the pipe shed. P/U
Wt = 48 klbs, and S/O Wt = 55 klbs,
Monitored displacement on pit #4.
11/28/2019
11/28/2019
0.25
PROD2
CASING
OWFF
P
OWFF (Static).
430.0
430.0
09:30
09:45
11/28/2019
11/28/2019
1.75
PROD2
CASING
BHAH
P
PJSM. L/D BHA#9. from 430' MD to
430.0
0.0
09:45
11:30
surface. Monitored displacement on
pit #4.
11/28/2019
11/28/2019
1.00
PROD2
CASING
BHAH
P
Cleaned and cleared rig floor.
0.0
0.0
11:30
12:30
Page 46/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
(hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/28/2019
11/2
1.50
COMPZ2
FISH
BHAHP
PJSM. P/U Whipstock retrieval BHA
0.0
127.0
12:30
14:
#10 from surface to 127' MD. P/U Wt
JTimeDur
= 48 klbs, and S/O Wt = 50 klbs,
Monitored displacement on pit #4.
11/28/2019
11/2
1.00
COMPZ2
FISH
TRIP
P
TIH from 127'MDto2,491'MDw/4"
127.0
2,491.0
14:00
15:
DP from the derrick. P/U Wt = 66 klbs,
and S/O Wt = 69 klbs, Monitored
displacement on pit #4.
11/28/2019
11/28/2019
0.50
COMPZ2
FISH
SVRG
P
Lubricate rig.
2,491.0
2,491.0
15:00
15:30
11/28/2019
11/28/2019
2.50
COMPZ2
FISH
TRIP
P
TIH from 2,491' MD to 6,277' MD w/ 4"
2,491.0
6,277.0
15:30
18:00
DP from the derrick. P/U Wt = 101
klbs, and S/O Wt = 92 klbs, Monitored
displacement on pit #4.
11/28/2019
11/29/2019
6.00
COMPZ2
FISH
TRIP
P
TIH from 6,277' MD to 14,292' MD w/
6,277.0
14,292.0
18:00
00:00
4" DP from the derrick. P/U Wt = 180
klbs, and S/O Wt = 128 klbs,
Monitored displacement on pit #4.
Logged R/Atag at 14,178' MD.
11/29/2019
11/29/2019
1.50
COMPZ2
FISH
WPST
P
Oriented 135 degrees Left GTF.
14,292.0
14,286.0
00:00
01:30
Washed slot 5 X. Oriented 45 degrees
right GTF. Set 10 klbs down weight @
14,374' MD. P/U to 225 klbs, 40 k over
(bleed of jars). P/U 255 klbs to release
anchor. Racked back one stand of DP
at 14,286' MD.
11/29/2019
11/29/2019
1.50
COMPZ2
FISH
CIRC
P
CBU at 14,286' MD w/ 255 gpm, SPP
14,286.0
14,286.0
01:30
03:00
1,320 psi, and F/O = 13%. Total
strokes pumped 4,921.
11/29/2019
11/29/2019
0.50
COMPZ2
FISH
OWFF
P
OWFF (Static).
14,286.0
14,286.0
03:00
03:30
11/29/2019
11/29/2019
2.50
COMPZ2
FISH
TRIP
P
POOH from 14,286' MD to 7,550' MD
14,286.0
7,550.0
03:30
06:00
w/ 4" DP racked back in the derrick.
P/U 143 klbs. Monitored displacement
on pit #4.
11/29/2019
11/29/2019
5.00
COMPZ2
FISH
TRIP
P
POOH from 7,550' MD to 352' MD w/
7,550.0
352.0
06:00
11:00
4" DP racked back in the derrick.
Monitored displacement on pit #4.
11/29/2019
11/29/2019
2.50
COMPZ2
FISH
BHAH
P
PJSM. L/D Whipstock and
352.0
0.0
11:00
13:30
Whipstock/retrieval BHA#10.
11/29/2019
11/29/2019
0.50
COMPZ2
FISH
BHAH
P
Cleaned and cleared rig floor.
0.0
0.0
13:30
14:00
11/29/2019
11/29/2019
0.75
COMPZ2
CLNOUT
BHAH
P
M/U Clean Out BHA #11.
0.0
82.0
14:00
14:45
11/29/2019
11/29/2019
3.25
COMPZ2
CLNOUT
TRIP
P
RIH w/ BHA#11 from 82' MD to 5,008'
82.0
5,008.0
14:45
18:00
MD w/ 4" DR P/U Wt = 90 klbs, S/O
Wt = 88, klbs. Monitored displacement
on pit #4. Filled every 20 stands.
11/29/2019
11/30/2019
6.00
COMPZ2
CLNOUT
TRIP
P
RIH w/ BHA#11 from 5,008' MD to
5,008.0
13,556.0
18:00
00:00
13,556' MD w/ 4" DR P/U Wt = 178
klbs, S/O Wt = 128, klbs. Monitored
displacement on pit #4. Filled every 20
stands.
11/30/2019
11/30/2019
0.50
COMPZ2
CLNOUT
TRIP
P
RIH w/ BHA#11 from 13,556' MD to
13,556.0
14,337.0
00:00
00:30
14,337' MD w/ 4" DR P/U Wt = 180
klbs, S/O Wt = 129, klbs. Monitored
displacement on pit #4. Filled every 20
stands.
11/30/2019
11/30/2019
0.50
COMPZ2
CLNOUT
TRIP
P
Worked clean out assembly w/ mill by
14,337.0
14,383.0
00:30
01:00
window at 14,369' MD to 14383' MD.
(Good)
Page 47/51 Report Printed: 12/31/2019
- Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
11/30/2019
11/30/2019
0.50
COMPZ2
CLNOUT
TRIP
P
RIH to 14,602' MD. Stung into TOL w/
14,383.0
14,602.0
01:00
01:30
GPM = 125 gpm, and SPP = 300 psi.
No pressure increase was observed.
P/U to 14,580' MD. Increased GPM =
210 gpm, and SPP = 680 psi (X2).
Observed the TOL at 14,590' MD.
11/30/2019
11/30/2019
1.00
COMPZ2
CLNOUT
CIRC
P
CBU at 14,588' MD w/ GPM = 251
14,602.0
14,588.0
01:30
02:30
gpm, SPP = 880 psi, F/O = 13%. Total
Stokes pumped = 6,129.
11/30/2019
11/30/2019
2.50
COMPZ2
CLNOUT
DISP
P
Displaced well to 9.5 ppg clear brine
14,588.0
14,588.0
02:30
05:00
at 14,588' MD w/ GPM = 210 - 251
gpm, SPP = 880-1,100 psi, F/O =
13%. Total Stokes pumped = 8,515.
11/30/2019
11/30/2019
2.00
COMPZ2
CLNOUT
CRIH
P
Pumped Corrosion Inhibited brine
14,588.0
14,588.0
05:00
07:00
directtly from truck at 14,588' MD w/
GPM = 210 - 251 gpm, SPP = 880-
1,100 psi, F/O = 13%. Total Stokes
pumped = 5,150.
11/30/2019
11/30/2019
0.50
COMPZ2
CLNOUT
OWFF
P
OWFF (Static).
14,588.0
14,588.0
07:00
07:30
11/30/2019
11/30/2019
4.50
COMPZ2
CLNOUT
PULD
P
POOH w/ clean out BHA whilst L/D 4"
14,588.0
12,500.0
07:30
12:00
DP singles from 14,588' MD to 12,500'
MD. P/U Wt= 160 klbs, S/O Wt = 125
klbs. Monitored hole fill on pit #2.
11/30/2019
11/30/2019
6.00
COMPZ2
CLNOUT
PULD
P
POOH w/ clean out BHA whilst L/D 4"
12,500.0
8,800.0
12:00
18:00
DP singles from 12,500' MD to 8,800'
MD. P/U Wt= 120 klbs, S/O Wt = 109
klbs. Monitored hole fill on pit #2.
11/30/2019
12/1/2019
6.00
COMPZ2
CLNOUT
PULD
P
POOH w/ clean out BHA whilst L/D 4"
8,800.0
4,200.0
18:00
00:00
DP singles from 8,800' MD to 4,200'
MD. P/U Wt= 80 klbs, S/O Wt = 80
klbs. Monitored hole fill on pit #2.
12/1/2019
12/1/2019
5.00
COMPZ2
CLNOUT
PULD
P
POOH while L/D 4" DP from 4,200'
4,200.0
0.0
00:00
05:00
MD to surface. Monitored hole fill on
pit #2.
12/1/2019
12/1/2019
1.50
COMPZ2
CLNOUT
BHAH
P
L/D Clean Out BHA #11.
0.0
0.0
05:00
06:30
12/1/2019
12/1/2019
0.50
COMPZ2
CLNOUT
BHAH
P
Cleaned and cleared rig floor.
0.0
0.0
06:30
07:00
12/1/2019
12/1/2019
1.50
COMPZ2
CLNOUT
SLPC
P
Slipped and cut 135' of drill line (17
0.0
0.0
07:00
08:30
wraps) and calibrated blocks.
12/1/2019
12/1/2019
0.50
COMPZ2
CLNOUT
OTHR
P
Pulled wear ring.
0.0
0.0
08:30
09:00
12/1/2019
12/1/2019
1.00
COMPZ2
CLNOUT
WWWH
P
L/D Single DP and magnets. Flushed
0.0
0.0
09:00
10:00
BOP stack. Rotary = 50 rpm, GPM =
675 GPM, SPP = 256 psi, and F/O =
33%.
12/1/2019
12/1/2019
1.00
COMPZ2
CLNOUT
BHAH
P
L/D Magnet and Double of 4" DP.
0.0
0.0
10:00
11:00
12/1/2019
12/1/2019
1.00
COMPZ2
WHDBOP
RURD
P
Set test plug and rigged up to test
0.0
0.0
11:00
12:00
BOPS. Rigged up to pump down the IA
w/ injection line to keep hole full.
12/1/2019
12/1/2019
0.50
COMPZ2
WHDBOP
BOPE
P
Performed shell test and fill hole down
0.0
0.0
12:00
12:30
IA. 3 bbls to fill.
Page 48/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/1/2019
12/1/2019
4.00
COMPZ2
WHDBOP
BOPE
P
Tested BOPE's. All tests 250psi
0.0
0.0
12:30
16:30
low/3500psi high for 5 charted minutes
with exception of manual operated
and super chokes which were tested
to 250/2000psi for 5 charted minutes.
Used 3 1/2" and 4 1/2" test jts,to test
the annular, 2 7/8 x 5 1/2 UPR, and
27/8 x 5 1/2 LPR. Tested choke
valves 1-15, manual operated and
super chokes, choke and kill manuals
and HCR's, 4" valve on kill line,
Blind/Shear Rams, 4" FOSV, 4" dart
valve, upper and lower IBOP. Perform
Koomey drawdown, Accumulator =
3000 psi, Manifold =1500 psi,
Accumulator =1600 psi after all
functions on just bottles. 15 secs to
200 psi build with 2 electric pumps, 85
secs to build to full system pressure
with 2 electric and 2 air pumps. N2 x 6
bottles Ave = 1860 psi. Closing times,
annular=24 secs, UPR=21 secs,
blind/shears=17 secs, LPR=16 sec,
Choke HCR=2 sec, kill HCR=2sec.
Tested PVT gain/loss and flow alarms.
Tested LEL and 1-12S alarms. AOGCC
Rep Austin McLeod waived witness on
11/29/2019 at 17:50 hr.
12/1/2019
12/1/2019
0.50
COMPZ2
WHDBOP
RURD
P
R/D and blowed down test equipment.
0.0
0.0
16:30
17:00
Cleaned and cleared rig floor. Pull test
plug.
12/1/2019
12/1/2019
2.50
COMPZ2
RPCOMP
RURD
P
Brought up tools to the rig floor and
0.0
0.0
17:00
19:30
rigged up to run upper completions.
12/1/2019
12/1/2019
2.50
COMPZ2
RPCOMP
PUTB
P
PJSM. RIH w/ 3 1/2" x 4 1/2" Upper
0.0
594.0
19:30
22:00
completions as per detail from 0 to
594' MD.
12/1/2019
12/1/2019
0.50
COMPZ2
RPCOMP
PUTB
P
Changed handling equipment. M/U I-
594.0
594.0
22:00
22:30
Wire to SLB Gauge Mandrel.
12/1/2019
12/2/2019
1.50
COMPZ2
RPCOMP
PUTB
P
Continued RIH w/4 1/2" Upper
594.0
1,788.0
22:30
00:00
completions as per detail from 594'
MD to 1,788' MD. P/U Wt = 58 klbs,
and S/O St = 66 klbs.
12/2/2019
12/2/2019
6.00
COMPZ2
RPCOMP
PUTB
P
Continued RIH w/ 4 1/2" Upper
1,788.0
6,780.0
00:00
06:00
completions as per detail from 1,788'
MD to 6,780' MD. P/U Wt = 92 klbs,
and S/O St = 91 klbs. Monitored
displacement on Pit #3.
12/2/2019
12/2/2019
6.00
COMPZ2
RPCOMP
PUTB
P
Continued RIH w/4 1/2" Upper
6,780.0
11,350.0
06:00
12:00
completions as per detail from 6,780'
MD to 11,350' MD. S/O St = 108 klbs.
Monitored displacement on Pit #3.
12/2/2019
12/2/2019
4.25
COMPZ2
RPCOMP
PUTB
P
Continued RIH w/ 4 1/2" Upper
11,350.0
14,583.0
12:00
16:15
completions as per detail from 11,350'
MD to 14,583' MD. P/U Wt = 146 klbs,
and S/O St = 113 klbs. Monitored
displacement on Pit #3.
12/2/2019
12/2/2019
1.25
COMPZ2
RPCOMP
HOSO
T
RIH and attempted to locate TOL.
14,583.0
14,593.0
16:15
17:30
Tagged up at 14,593' MD w/ 15 klbs
down weight. No indication of shear
was observed. Put in 3/4 turn and
worked pipe. Attempted to locate on
the down stroke. P/U Wt = 146 klbs,
and S/O Wt = 113 klbs.
Page 49/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/2/2019
12/2/2019
0.50
C iMPZ2
RPCOMP
HOSO
T
L/D joint #346 and P/U 9' pup joint.
14,593.0
14,593.0
17:30
18:00
R/U to pump down tubing w/ top drive.
Established circualtion at 2 bpm, SPP
= 90 psi. Total strokes pumped = 86.
Re -attempted to locate w/ pumps on
and one full turn.
12/2/2019
12/2/2019
1.00
COMPZ2
RPCOMP
HOSO
T
Worked completions and sting into the
14,593.0
14,593.0
18:00
19:00
TOL .f/ 14,520' MD to 14,593' MD four
times to no avail. GPM 168 gpm, and
SPP = 158 psi. Total strokes purred =
84. Attempted to sting in liner top
(Unsuccessful). Rotated string and
applied a half a turn. Worked the
completions down into the liner top
and set 14 klbs down weight. Pins
sheared at 14,613' MD. Fully located
on Joint 346 @ 14,614' MD.
12/2/2019
12/2/2019
1.00
COMPZ2
RPCOMP
CIRC
P
L/D joint #346. B/D top drive. Pumped
14,593.0
14,555.0
19:00
20:00
30 bbls of 10 ppg clear brine. SPP =
158 psi and Total Strokes = 282.
12/2/2019
12/2/2019
1.00
COMPZ2
RPCOMP
HOSO
P
L/D joints 344-346 and 9' pup. M/U
14,555.0
14,560.0
20:00
21:00
spaceout pups as follows: 5.82' 5.83',
3.77', 3.78', Joint #344, hanger, and
landing joint.
12/2/2019
12/2/2019
1.00
COMPZ2
RPCOMP
THGR
P
Terminated I -Wire and tested to 5,000
14,560.0
14,560.0
21:00
22:00
psi/5 minutes. P/U Wt = 143 klbs, and
S/O Wt = 103 klbs.
12/2/2019
12/3/2019
2.00
COMPZ2
RPCOMP
THGR
T
Worked 4 1/2" completions string from
14,560.0
14,593.0
22:00
00:00
14,505' MD to 14,593' MD a total of 25
times to no avail. M/U crossover to
top drive and rotated one full turn to
try and sting into top of liner. Located
liner top.
12/3/2019
12/3/2019
1.50
COMPZ2
RPCOMP
THGR
P
Land Hanger and RILDS. R/U test
14,593.0
14,593.0
00:00
01:30
hanger seals to 3,000 psi for 30
minutes (Charted). Monitored IA while
testing (No flow).
12/3/2019
12/3/2019
1.00
COMPZ2
RPCOMP
RURD
P
Cleaned and cleared rig floor. Blowed
14,593.0
0.0
01:30
02:30
down surface lines. L/D landing joint.
12/3/2019
12/3/2019
3.50
COMPZ2
WHDBOP
NUND
P
Sucked out stack. Removed hole fill,
0.0
0.0
02:30
06:00
trip nipple, shrue hole & mouse hole,
R/D choke & kill lines, broke bols on
the stack and riser, P/U BOPs, and
skidded out of the way. Picked up
BOP riser and staged in BOP deck.
SIMOPS: P/U frac tree to rig floor.
12/3/2019
12/3/2019
1.75
COMPZ2
WHDBOP
NUND
P
Terminated and tested I -Wire.
0.0
0.0
06:00
07:45
12/3/2019
12/3/2019
0.25
COMPZ2
WHDBOP
NUND
P
Prepped wellhead for adaptor flange
0.0
0.0
07:45
08:00
and frac tree.
12/3/2019
12/3/2019
3.00
COMPZ2
WHDBOP
NUND
P
Reassembled and oriented FMC 10k
0.0
0.0
08:00
11:00
frac tree/adaptor. SIMOPS: C/O saver
sub on top drive.
12/3/2019
12/3/2019
0.50
COMPZ2
WHDBOP
PRTS
P
Test adaptor flange SBM seals to
0.0
0.0
11:00
11:30
5,000 psi for 5 minutes.
12/3/2019
12/3/2019
0.50
COMPZ2
WHDBOP
OTHR
P
Filled tree w/ diesel and function
0.0
0.0
11:30
12:00
valves to purge. R/U to test.
12/3/2019
12/3/2019
2.00
COMPZ2
WHDBOP
FRZP
P
R/U lines for freeze protect. Heat and
0.0
0.0
12:00
14:00
ship diesel to ball mill for freeze
protect.
12/3/2019
12/3/2019
1.75
COMPZ2
WHDBOP
PRTS
P
Pressure tested tree from 250 psi
0.0
0.0
14:00
15:45
low/10,000 psi high, CPAI witnessed.
Bled off and checked IA (On Vaccum).
Page 50/51 Report Printed: 12/31/2019
Operations Summary (with Timelog Depths)
)_ CD5-26
Rig: HES Frac Equipment Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth (ftKB)
12/3/2019
12/3/2019
0.50
COMPZ2
WHDBOP
PRTS
P
Rigged down test equipment.
0.0
0.0
15:45
16:15
12/3/2019
12/3/2019
0.75
COMPZ2
WHDBOP
MPSP
P
Pulled test dart and HP-BPV.
0.0
0.0
16:15
17:00
12/3/2019
12/3/2019
1.00
COMPZ2
WHDBOP
PRTS
P
M/U hoses and hardlines to tree and
0.0
0.0
17:00
18:00
tested to 2,250 psi.
12/3/2019
12/3/2019
1.00
COMPZ2
WHDBOP
FRZP
P
Pumped 73 bbls diesel freeze protect
0.0
0.0
18:00
19:00
down IA (Charted).
12/3/2019
12/3/2019
1.00
COMPZ2
WHDBOP
FRZP
P
IA pressure before U -tubing equalized
0.0
0.0
19:00
20:00
was 450 psi. Upon equalization the
pressures read 220 psi. SIMOPS: R/U
bridle lines and prepped derrick for
scope.
12/3/2019
12/3/2019
0.50
COMPZ2
WHDBOP
FRZP
P
Blowed down and rigged down freeze
0.0
0.0
20:00
20:30
protect lines in the cellar.
12/3/2019
12/4/2019
3.50
COMPZ2
WHDBOP
SEQP
T
R/U lubricator and tested to 2,000 psi
0.0
0.0
20:30
00:00
(Good). Ran in w/ H-BPV via lubricator
and resistance was felt while lowering
into the tree. Shut in master valve and
attempted to free BPV w/ no success.
No upwared/downward movement
was achieved once the H-BPV was
stuck in the tree. Continued trying to
extract the H-BPV and lubricator.
12/4/2019
12/4/2019
5.00
COMPZ2
WHDBOP
WAIT
T
Sent FMC rep for bedrest while
0.0
0.0
00:00
05:00
evaluating lubricator issue. Monitor IA
and tubing pressures every half hour,
slowly dropped to 0/0 psi.
SIMOPS- Complete rig work orders,
change out worn valves in pit
complex.
12/4/2019
12/4/2019
1.00
COMPZ2
WHDBOP
WAIT
T
Continue waiting for FMC rep. Fully
0.0
0.0
05:00
06:00
opened master valve, pulled lubricator
and inspected BPV, re -installed
lubricator.
SIMOPS- Lower cattle chute, R/U
bridle lines on top drive.
12/4/2019
12/4/2019
0.50
COMPZ2
WHDBOP
WAIT
T
Continue waiting for FMC rep.
0.0
0.0
06:00
06:30
Continue R/U bridle lines on top drive
and set in sheaves. Continue
changing out valves in pit module,
work on welding projects in pit
module.
12/4/2019
12/4/2019
2.00
COMPZ2
WHDBOP
WAIT
T
Continue waiting for FMC rep.
0.0
0.0
06:30
08:30
SIMOPS- Blow down water and steam
n pits.
12/4/2019
12/4/2019
1.00
COMPZ2
WHDBOP
MPSP
P
Pull lubricator and BPV, inspect and re
0.0
0.0
08:30
09:30
-install. FMC set Type H BPV with
lubricator.
12/4/2019
12/4/2019
0.50
DEMOB
MOVE
RURD
P
Secure well, install gauges, wipe
0.0
0.0
09:30
10:00
down. Install valve handles. Clean
cellar box.
12/4/2019
12/4/2019
1.25
DEMOB
MOVE
RURD
P
Scope derrick down and pin to derrick.
0.0
0.0
10:00
11:15
Secure energy track.
12/4/2019
12/4/2019
0.75
DEMOB
MOVE
RURD
P
Un -Spool line off drum, secure derrick
0.0
0.0
11:15
12:00
to lay over. SIMOPS- Unplugging
complexes, begin pulling Ball Mill
away.
Rig Release @ 12:00 hrs 12/4/19
Page 51/51 Report Printed: 12/31/2019
NADConversion
Western North Slope
CD5 Alpine West Pad
CD5-26L1
CD5-261-1
ConocoPhillips
Definitive Survey Report
06 December, 2019
Conoco hilli s
p
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Co-ordinate Reference:
Well CD5-26
Project:
Western North Slope
TVD Reference:
CD5-26 Actual @ 73.0usft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-26 Actual @ 73.0usft (D25)
Well:
CD5-26
North Reference:
True
Wellbore:
CD5-261_1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-261_1
Database:
EDT 14 Alaska Production
Project Western North Slope, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Well CD5-26
Well Position +N/ -S
+E/ -W
Position Uncertainty
0.0 usft Northing: 5,965,780.64 usft Latitude: 70° 18'48.943 N
0.0 usft Easting: 349,057.94 usft Longitude: 151° 13'24.027 W
0.0 usft Wellhead Elevation: 0.0 usft Ground Level: 33.7 usft
Wellbore
CD5-26L1
Magnetics
Model Name Sample Date
Declination
Dip Angle
(usft)
BGGM2018 11/25/2019
Tool Name Description Survey Date
15 85
F_
2,054.8 CD5-26 Srvy 1 - SLB_NSG+Battery+SAG
GYD-GC-SS Gyrodata gyro single shots 10/12/2019
11:3:
Design
CD5-26L1
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correc110/12/2019
2:1C
Audit Notes:
2,223.0 CD5-26 Srvy 3 - SLB _MWD-Inc_Only_Fi
MWD-INC_ONLY (INC>10°) MWD -INC _ONLY -FILLER ( INC>10°) 10/15/2019
3:3f
Version:
1.0 Phase:
ACTUAL
Tie On Depth:
Vertical Section:
Depth From (TVD)
+N/ -S
+E/ -W
14,678.8
(usft)
(usft)
(usft)
(usft)
39.3
0.0
0.0
Field Strength
(nT)
80.71 57, 359.59665207
14,276.8
Direction
(I
158.32
Survey Program
Date
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name Description Survey Date
74.0
2,054.8 CD5-26 Srvy 1 - SLB_NSG+Battery+SAG
GYD-GC-SS Gyrodata gyro single shots 10/12/2019
11:3:
2,089.7
2,173.9 CD5-26 Srvy 2 - SLB_MWD+GMAG (CD
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correc110/12/2019
2:1C
2,223.0
2,223.0 CD5-26 Srvy 3 - SLB _MWD-Inc_Only_Fi
MWD-INC_ONLY (INC>10°) MWD -INC _ONLY -FILLER ( INC>10°) 10/15/2019
3:3f
2,316.8
14,276.8 CD5-25 Srvy 4 - SLB_MWD+GMAG (CD
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correci10/15/2019
3:44
14,369.0
14,581.4 CD5-261_1 Srvy 1 - SLB _ MWD -Inc _Only_
MWD-INC_ONLY (INC>10°) MWD -INC -ONLY -FILLER ( INC>10°) 11/25/2019
9:04
14,678.8
17,932.0 CD5-261_1 Srvy 2 - SLB_MWD+GMAG (C
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Correc111/25/2019
9:07
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
(1
0
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°lloo')
(ft) Survey Tool Name
39.3
0.00
0.00
39.3
-33.7
0.0
0.0
5,965,780.6
349,057.9
0.0
0.00 UNDEFINED
74.0
0.13
201.33
74.0
1.0
0.0
0.0
5,965,780.6
349,057.9
0.4
0.03 GYD-GC-SS (1)
168.1
0.08
358.40
168.1
95.1
-0.1
-0.1
5,965,780.6
349,057.9
0.2
0.05 GYD-GC-SS (1)
262.4
0.03
36.71
262.4
189.4
0.0
0.0
5,965,780.7
349,057.9
0.1
-0.03 GYD-GC-SS (1)
357.3
0.18
126.88
357.3
284.4
-0.1
0.1
5,965,780.6
349,058.0
0.2
0.08 GYD-GC-SS(1)
451.7
0.00
95.13
451.7
378.7
-0.1
0.2
5,965,780.5
349,058.1
0.2
0.21 GYD-GC-SS (1)
546.2
0.32
9.03
546.2
473.2
0.1
0.3
5,965,780.7
349,058.2
0.3
-0.02 GYD-GC-SS (1)
640.7
0.24
46.97
640.7
567.7
0.5
0.4
5,965,781.1
349,058.4
0.2
-0.31 GYD-GC-SS(1)
734.5
0.34
107.95
734.4
661.5
0.6
0.8
5,965,781.2
349,058.8
0.3
-0.21 GYD-GC-SS (1)
828.5
2.13
175.79
828.5
755.5
-1.3
1.2
5,965,779.3
349,059.1
2.2
1.64 GYD-GC-SS (1)
12/6/2019 9:53:06AM Page 2 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Co-ordinate Reference:
Well CD5-26
Project:
Western North Slope
TVD Reference:
CD5-26 Actual @ 73.0usft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-26 Actual @ 73.0usft (D25)
Well:
CD5-26
North Reference:
True
Wellbore:
CD5-261-1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-261-1
Database:
EDT 14 Alaska Production
Survey
12/6/2019 9:53:06AM Page 3 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
AZI
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
US
Section
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100')
(ft) Survey Tool Name
923.1
4.17
176.22
923.0
850.0
-6.5
1.6
5,965,774.2
349,059.4
2.2
6.59 GYD-GC-SS (1)
1,017.3
4.92
169.96
1,016.9
943.9
-13.8
2.5
5,965,766.7
349,060.2
1.0
13.80 GYD-GC-SS (1)
1,111.8
5.96
168.70
1,111.0
1,038.0
-22.7
4.2
5,965,757.9
349,061.7
1.1
22.60 GYD-GC-SS (1)
1,205.9
7.64
163.55
1,204.4
1,131.4
-33.4
6.9
5,965,747.1
349,064.2
1.9
33.63 GYD-GC-SS (1)
1,300.7
9.57
161.42
1,298.1
1,225.1
-47.0
11.2
5,965,733.5
349,068.2
2.1
47.78 GYD-GC-SS (1)
1,394.9
11.05
160.80
1,390.7
1,317.8
-62.9
16.7
5,965,717.4
349,073.3
1.6
64.61 GYD-GC-SS(1)
1,489.4
13.41
158.51
1,483.1
1,410.1
-81.6
23.7
5,965,698.5
349,080.0
2.6
84.61 GYD-GC-SS (1)
1,583.2
15.61
159.30
1,573.9
1,500.9
-103.6
32.1
5,965,676.4
349,088.0
2.4
108.12 GYD-GC-SS (1)
1,677.6
17.52
161.39
1,664.4
1,591.4
-128.9
41.2
5,965,650.9
349,096.5
2.1
135.02 GYD-GC-SS (1)
1,771.8
19.16
162.19
1,753.8
1,680.8
-157.1
50.4
5,965,622.6
349,105.2
1.8
164.58 GYD-GC-SS (1)
1,864.3
20.94
163.32
1,840.7
1,767.7
-187.4
59.8
5,965,592.1
349,113.9
2.0
196.20 GYD-GC-SS (1)
1,958.3
23.43
165.40
1,927.7
1,854.7
-221.6
69.3
5,965,557.8
349,122.8
2.8
231.49 GYD-GC-SS (1)
2,054.8
25.71
168.36
2,015:5
1,942.5
-260.6
78.4
5,965,518.5
349,131.1
2.7
271.15 GYD-GC-SS (1)
2,089.7
26.88
168.90
2,046.7
1,973.7
-275.8
81.4
5,965,503.3
349,133.8
3.4
286.34 MWD+IFR2+SAG+MS (2)
2,173.9
28.32
169.51
2,121.4
2,048.4
-314.1
88.7
5,965,464.8
349,140.3
1.7
324.66 MWD+IFR2+SAG+MS (2)
2,223.0
29.20
169.51
2,164.4
2,091.4
-337.3
93.0
5,965,441.5
349,144.2
1.8
347.84 MWD-INC_ONLY(INC>10°)(3)
I
2,316.8
29.99
167.81
2,246.0
2,173.0
-382.7
102.1
5,965,395.9
349,152.4
1.2
393.41 MWD+IFR2+SAG+MS (4)
2,409.3
31.28
165.11
2,325.5
2,252.6
-428.5
113.2
5,965,349.9
349,162.5
2.0
440.05 MWD+IFR2+SAG+MS (4)
2,504.6
35.53
162.13
2,405.2
2,332.2
-478.9
128.1
5,965,299.3
349,176.3
4.8
492.32 MWD+IFR2+SAG+MS (4)
2,597.3
39.21
160.92
2,478.8
2,405.8
-532.2
145.9
5,965,245.7
349,193.1
4.1
548.45 MWD+IFR2+SAG+MS (4)
2,691.3
42.79
160.18
2,549.7
2,476.7
-590.3
166.5
5,965,187.1
349,212.5
3.8
610.05 MWD+IFR2+SAG+MS (4)
2,784.9
46.47
161.05
2,616.3
2,543.4
-652.4
188.3
5,965,124.6
349,233.0
4.0
675.79 MWD+IFR2+SAG+MS (4)
2,879.7
50.03
162.54
2,679.4
2,606.5
-719.5
210.3
5,965,057.1
349,253.7
3.9
746.34 MWD+IFR2+SAG+MS (4)
2,975.1
52.05
162.30
2,739.4
2,666.4
-790.2
232.7
5,964,986.0
349,274.7
2.1
820.29 MWD+IFR2+SAG+MS (4)
3,068.0
53.86
161.93
2,795.4
2,722.4
-860.8
255.5
5,964,914.9
349,296.1
2.0
894.33 MWD+IFR2+SAG+MS (4)
3,162.3
56.05
161.58
2,849.5
2,776.5
-934.1
279.7
5,964,841.2
349,318.8
2.3
971.34 MWD+IFR2+SAG+MS (4)
3,257.6
59.48
161.47
2,900.4
2,827.4
-1,010.6
305.2
5,964,764.2
349,342.8
3.6
1,051.86 MWD+IFR2+SAG+MS (4)
3,352.5
62.28
160.19
2,946.5
2,873.6
-1,088.9
332.5
5,964,685.4
349,368.4
3.2
1,134.70 MWD+IFR2+SAG+MS (4)
3,445.8
63.95
160.80
2,988.7
2,915.8
-1,167.3
360.2
5,964,606.4
349,394.6
1.9
1,217.85 MWD+IFR2+SAG+MS (4)
3,541.1
64.41
161.21
3,030.2
2,957.2
-1,248.4
388.2
5,964,524.8
349,420.9
0.6
1,303.51 MWD+IFR2+SAG+MS (4)
3,635.2
64.37
163.21
3,070.9
2,997.9
-1,329.2
414.1
5,964,443.5
349,445.2
1.9
1,388.17 MWD+IFR2+SAG+MS (4)
3,730.1
64.38
163.65
3,111.9
3,039.0
-1,411.2
438.5
5,964,361.0
349,467.9
0.4
1,473.37 MWD+IFR2+SAG+MS (4)
3,823.4
64.37
163.52
3,152.3
3,079.3
-1,491.9
462.2
5,964,279.9
349,490.1
0.1
1,557.12 MWD+IFR2+SAG+MS (4)
3,917.6
64.44
164.13
3,193.0
3,120.0
-1,573.5
485.9
5,964,197.8
349,512.1
0.6
1,641.75 MWD+IFR2+SAG+MS (4)
4,011.3
64.20
164.07
3,233.6
3,160.6
-1,654.7
509.1
5,964,116.2
349,533.6
0.3
1,725.71 MWD+IFR2+SAG+MS (4)
4,106.2
64.37
163.85
3,274.8
3,201.8
-1,736.9
532.7
5,964,033.5
349,555.6
0.3
1,810.80 MWD+IFR2+SAG+MS (4)
4,200.0
64.31
163.81
3,315.4
3,242.4
-1,818.1
556.2
5,963,951.9
349,577.5
0.1
1,894.98 MWD+IFR2+SAG+MS (4)
4,293.3
64.11
162.93
3,356.0
3,283.0
-1,898.6
580.3
5,963,870.9
349,599.9
0.9
1,978.65 MWD+IFR2+SAG+MS (4)
4,390.0
64.22
162.03
3,398.1
3,325.1
-1,981.5
606.5
5,963,787.4
349,624.4
0.8
2,065.43 MWD+IFR2+SAG+MS (4)
4,484.3
64.25
161.25
3,439.1
3,366.1
-2,062.2
633.2
5,963,706.3
349,649.5
0.7
2,150.22 MWD+IFR2+SAG+MS (4)
12/6/2019 9:53:06AM Page 3 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Co-ordinate Reference: Well CD5-26
Project:
Western North Slope
TVD Reference:
CD5-26
Actual @ 73.0usft (D25)
Site:
CD5
Alpine West Pad
MD Reference:
CD5-26
Actual @ 73.0usft (D25)
Well:
CD5-26
North Reference:
True
Wellbore:
CD5-261-1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-261-1
Database:
EDT 14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100')
(ft) Survey Tool Name
4,578.3
64.08
159.68
3,480.1
3,407.1
-2,141.9
661.5
5,963,626.0
349,676.2
1.5
2,234.81 MWD+IFR2+SAG+MS (4)
4,671.5
64.25
159.15
3,520.7
3,447.7
-2,220.5
691.0
5,963,546.9
349,704.1
0.5
2,318.68 MWD+IFR2+SAG+MS (4)
4,766.3
64.34
158.61
3,561.8
3,488.8
-2,300.1
721.8
5,963,466.7
349,733.3
0.5
2,404.04 MWD+IFR2+SAG+MS (4)
4,860.3
64.31
157.72
3,602.5
3,529.6
-2,378.8
753.3
5,963,387.4
349,763.2
0.9
2,488.78 MWD+IFR2+SAG+MS (4)
4,954.7
64.34
156.95
3,643.4
3,570.5
-2,457.3
786.1
5,963,308.3
349,794.4
0.7
2,573.84 MWD+IFR2+SAG+MS (4)
5,049.6
64.27
156.88
3,684.6
3,611.6
-2,536.0
819.6
5,963,228.9
349,826.3
0.1
2,659.36 MWD+IFR2+SAG+MS (4)
5,142.6
64.35
156.89
3,724.9
3,651.9
-2,613.0
852.5
5,963,151.2
349,857.7
0.1
2,743.12 MWD+IFR2+SAG+MS (4)
5,237.3
64.20
157.31
3,766.0
3,693.0
-2,691.6
885.7
5,963,072.0
349,889.3
0.4
2,828.40 MWD+IFR2+SAG+MS (4)
5,331.1
64.47
157.77
3,806.6
3,733.7
-2,769.7
918.0
5,962,993.2
349,920.0
0.5
2,912.95 MWD+IFR2+SAG+MS (4)
5,426.6
64.47
158.76
3,847.8
3,774.8
-2,849.8
949.9
5,962,912.5
349,950.3
0.9
2,999.14 MWD+IFR2+SAG+MS (4)
5,520.7
64.43
158.92
3,888.4
3,815.4
-2,929.0
980.6
5,962,832.7
349,979.4
0.2
3,084.06 MWD+IFR2+SAG+MS (4)
5,612.4
64.43
159.16
3,927.9
3,855.0
-3,006.2
1,010.1
5,962,755.0
350,007.4
0.2
3,166.72 MWD+IFR2+SAG+MS (4)
5,704.5
64.34
159.43
3,967.8
3,894.8
-3,083.9
1,039.5
5,962,676.7
350,035.2
0.3
3,249.82 MWD+IFR2+SAG+MS (4)
5,799.0
64.31
160.19
4,008.7
3,935.7
-3,163.8
1,068.9
5,962,596.2
350,062.9
0.7
3,334.90 MWD+IFR2+SAG+MS (4)
5,893.3
64.38
160.23
4,049.5
3,976.6
-3,243.8
1,097.7
5,962,515.7
350,090.1
0.1
3,419.87 MWD+IFR2+SAG+MS (4)
5,987.1
64.42
160.42
4,090.1
4,017.1
-3,323.5
1,126.2
5,962,435.4
350,117.0
0.2
3,504.46 MWD+IFR2+SAG+MS (4)
6,080.8
63.95
161.02
4,130.9
4,057.9
-3,403.1
1,154.0
5,962,355.3
350,143.2
0.8
3,588.67 MWD+IFR2+SAG+MS (4)
6,175.3
64.00
161.50
4,172.4
4,099.4
-3,483.5
1,181.3
5,962,274.3
350,168.9
0.5
3,673.52 MWD+IFR2+SAG+MS (4)
6,272.1
63.92
161.80
4,214.8
4,141.9
-3,566.1
1,208.7
5,962,191.3
350,194.6
0.3
3,760.33 MWD+IFR2+SAG+MS (4)
6,366.0
63.89
161.52
4,256.1
4,183.2
-3,646.1
1,235.2
5,962,110.7
350,219.5
0.3
3,844.50 MWD+IFR2+SAG+MS (4)
6,457.9
63.96
161.57
4,296.6
4,223.6
-3,724.4
1,261.4
5,962,031.9
350,244.1
0.1
3,926.96 MWD+IFR2+SAG+MS (4)
6,552.3
63.95
160.99
4,338.0
4,265.0
-3,804.7
1,288.6
5,961,951.1
350,269.7
0.6
4,011.59 MWD+IFR2+SAG+MS (4)
6,646.6
63.99
161.42
4,379.4
4,306.4
-3,885.0
1,315.9
5,961,870.3
350,295.4
0.4
4,096.27 MWD+IFR2+SAG+MS (4)
6,741.1
63.89
160.74
4,420.9
4,347.9
-3,965.2
1,343.4
5,961,789.5
350,321.2
0.7
4,181.01 MWD+IFR2+SAG+MS (4)
6,835.7
63.90
161.84
4,462.5
4,389.5
A.045.7
1,370.6
5,961,708.5
350,346.9
1.0
4,265.89 MWD+IFR2+SAG+MS (4)
6,929.1
63.80
161.24
4,503.7
4,430.7
A,125.2
1,397.2
5,961,628.4
350,371.8
0.6
4,349.60 MWD+IFR2+SAG+MS (4)
7,023.4
63.86
160.33
4,545.3
4,472.3
-4,205.1
1,425.0
5,961,548.0
350,396.1
0.9
4,434.11 MWD+IFR2+SAG+MS (4)
7,117.2
63.90
160.29
4,586.6
4,513.6
-4,284.4
1,453.4
5,961,468.2
350,424.8
0.1
4,518.30 MWD+IFR2+SAG+MS (4)
7,211.4
63.86
160.02
4,628.0
4,555.1
-4,364.0
1,482.1
5,961,388.0
350,452.0
0.3
4,602.88 MWD+IFR2+SAG+MS (4)
7,307.5
63.96
159.85
4,670.3
4,597.3
-4,445.1
1,511.7
5,961,306.4
350,479.9
0.2
4,689.12 MWD+IFR2+SAG+MS (4)
7,401.3
63.99
160.94
4,711.5
4,638.5
A,524.5
1,540.0
5,961,226.4
350,506.6
1.0
4,773.38 MWD+IFR2+SAG+MS (4)
7,494.1
64.10
160.94
4,752.1
4,679.1
-4,603.3
1,567.3
5,961,147.1
350,532.2
0.1
4,856.70 MWD+IFR2+SAG+MS (4)
7,590.3
64.05
161.33
4,794.1
4,721.2
-4,685.2
1,595.3
5,961,064.6
350,558.6
0.4
4,943.16 MWD+IFR2+SAG+MS (4)
7,684.2
63.99
161.40
4,835.3
4,762.3
-4,765.2
1,622.2
5,960,984.1
350,583.9
0.1
5,027.43 MWD+IFR2+SAG+MS (4)
7,777.6
64.07
160.74
4,876.2
4,803.2
-4,844.7
1,649.5
5,960,904.2
350,609.6
0.6
5,111.32 MWD+IFR2+SAG+MS (4)
7,871.1
64.06
159.92
4,917.0
4,844.1
A,923.8
1,677.8
5,960,824.5
350,636.3
0.8
5,195.29 MWD+IFR2+SAG+MS (4)
7,965.2
64.09
158.64
4,958.2
4,885.2
-5,002.9
1,707.7
5,960,744.8
350,664.6
1.2
5,279.90 MWD+IFR2+SAG+MS (4)
8,059.6
63.96
157.81
4,999.6
4,926.7
-5,081.9
1,739.3
5,960,665.1
350,694.6
0.8
5,364.98 MWD+IFR2+SAG+MS (4)
8,154.1
63.90
158.03
5,041.1
4,968.1
-5,160.4
1,771.1
5,960,586.0
350,724.8
0.2
5,449.71 MWD+IFR2+SAG+MS (4)
8,245.6
64.19
157.81
5,081.1
5,008.1
-5,236.6
1,802.0
5,960,509.2
350,754.2
0.4
5,531.93 MWD+IFR2+SAG+MS (4)
12/6/2019 9: 53 06A Page 4 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Repoli
Company:
NADConversion
Local Coordinate Reference:
Well CD5-26
Project:
Western North Slope
TVD Reference:
CD5-26 Actual @ 73.0usft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-26 Actual @ 73.0usft (D25)
Well:
CD5-26
North Reference:
True
Wellbore:
CD5-261-1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-261-1
Database:
EDT 14 Alaska Production
Survey
12/6/2019 9.53.06AM Page 5 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100')
(ft) Survey Tool Name
8,340.2
64.09
158.30
5,122.4
5,049.4
-5,315.6
1,833.8
5,960,429.6
350,784.4
0.5
5,617.05 MWD+IFR2+SAG+MS (4)
8,434.2
63.93
159.32
5,163.6
5,090.6
-5,394.4
1,864.4
5,960,350.3
350,813.4
1.0
5,701.54 MWD+IFR2+SAG+MS (4)
8,528.5
64.00
159.18
5,205.0
5,132.0
-5,473.6
1,894.4
5,960,270.4
350,841.8
0.2
5,786.30 MWD+IFR2+SAG+MS (4)
8,622.8
64.16
159.15
5,246.2
5,173.2
-5,552.9
1,924.6
5,960,190.6
350,870.3
0.2
5,871.07 MWD+IFR2+SAG+MS (4)
8,717.7
63.96
159.86
5,287.7
5,214.7
-5,632.8
1,954.4
5,960,110.1
350,898.6
0.7
5,956.41 MWD+IFR2+SAG+MS (4)
8,811.7
64.13
159.90
5,328.9
5,255.9
-5,712.2
1,983.5
5,960,030.1
350,926.1
0.2
6,040.93 MWD+IFR2+SAG+MS (4)
8,905.7
64.02
160.40
5,369.9
5,297.0
-5,791.7
2,012.2
5,959,950.0
350,953.2
0.5
6,125.42 MWD+IFR2+SAG+MS (4)
9,000.4
64.03
160.45
5,411.4
5,338.4
-5,871.9
2,040.7
5,959,869.3
350,980.1
0.0
6210.44 MWD+IFR2+SAG+MS (4)
9,094.3
64.05
161.30
5,452.5
5,379.5
-5,951.7
2,068.4
5,959,789.0
351,006.1
0.8
6,294.77 MWD+IFR2+SAG+MS (4)
9,188.1
64.09
161.30
5,493.5
5,420.5
-6,031.6
2,095.4
5,959,708.6
351,031.6
0.0
6,379.01 MWD+IFR2+SAG+MS (4)
9,282.3
64.00
161.87
5,534.7
5,461.8
-6,111.9
2,122.2
5,959,627.7
351,056.7
0.6
6,463.58 MWD+IFR2+SAG+MS (4)
9,376.8
64.19
162.64
5,576.0
5,503.1
E, 192.9
2,148.1
5,959,546.3
351,081.0
0.8
6,548.40 MWD+IFR2+SAG+MS (4)
9,470.9
64.09
163.48
5,617.1
5,544.1
-6,273.9
2,172.8
5,959,464.8
351,104.0
0.8
6,632.76 MWD+IFR2+SAG+MS (4)
9,565.2
64.25
163.61
5,658.2
5,585.2
-6,355.3
2,196.8
5,959,382.9
351,126.4
0.2
6,717.35 MWD+IFR2+SAG+MS (4)
9,659.6
64.12
163.82
5,699.3
5,626.3
-6,436.9
2,220.7
5,959,300.8
351,148.6
0.2
6,801.97 MWD+IFR2+SAG+MS (4)
9,754.0
63.96
164.05
5,740.6
5,667.6
-6,518.5
2,244.1
5,959,218.9
351,170.4
0.3
6,886.41 MWD+IFR2+SAG+MS (4)
9,849.1
64.00
162.86
5,782.3
5,709.4
-6,600.4
2,268.5
5,959,136.5
351,193.1
1.1
6,971.53 MWD+IFR2+SAG+MS (4)
9,943.1
64.06
162.11
5,823.5
5,750.5
-6,681.0
2,293.9
5,959,055.4
351,216.9
0.7
7,055.83 MWD+IFR2+SAG+MS (4)
10,037.7
64.02
161.67
5,864.9
5,791.9
-6,761.8
2,320.4
5,958,974.0
351,241.7
0.4
7,140.72 MWD+IFR2+SAG+MS (4)
10,131.7
64.19
160.90
5,905.9
5,833.0
-6,841.9
2,347.5
5,958,893.5
351,267.2
0.8
7,225.13 MWD+IFR2+SAG+MS (4)
10,226.6
64.02
160.51
5,947.4
5,874.4
-6,922.5
2,375.7
5,958,812.3
351,293.8
0.4
7,310.43 MWD+IFR2+SAG+MS (4)
10,321.2
64.13
161.11
5,988.7
5,915.8
-7,002.8
2,403.6
5,958,731.5
351,320.2
0.6
7,395.40 MWD+IFR2+SAG+MS (4)
10,415.1
63.98
161.27
6,029.8
5,956.8
-7,082.7
2,430.9
5,958,651.0
351,345.8
0.2
7,479.73 MWD+IFR2+SAG+MS (4)
10,509.9
64.14
160.69
6,071.3
5,998.3
-7,163.3
2,458.7
5,958,569.9
351,371.9
0.6
7,564.89 MWD+IFR2+SAG+MS (4)
10,603.3
63.67
160.73
6,112.4
6,039.4
-7,242.5
2,486.4
5,958,490.2
351,398.0
0.5
7,648.73 MWD+IFR2+SAG+MS(4)
10,697.2
63.65
159.82
6,154.1
6,081.1
-7,321.7
2,514.8
5,958,410.4
351,424.8
0.9
7,732.84 MWD+IFR2+SAG+MS (4)
10,791.2
63.58
159.54
6,195.8
6,122.9
-7,400.7
2,544.0
5,958,330.8
351,452.5
0.3
7,817.03 MWD+IFR2+SAG+MS (4)
10,884.5
63.59
158.96
6,237.3
6,164.4
-7,478.9
2,573.6
5,958,252.1
351,480.5
0.6
7,900.60 MWD+IFR2+SAG+MS (4)
10,979.1
63.59
158.89
6,279.4
6,206.4
-7,557.9
2,604.1
5,958,172.5
351,509.4
0.1
7,985.29 MWD+IFR2+SAG+MS (4)
11,073.2
63.35
158.94
6,321.5
6,248.5
-7,636.5
2,634.4
5,958,093.3
351,538.1
0.3
8,069.51 MWD+IFR2+SAG+MS (4)
11,167.1
63.52
159.02
6,363.4
6,290.5
-7,714.9
2,664.5
5,958,014.4
351,566.6
0.2
8,153.47 MWD+IFR2+SAG+MS (4)
11,263.9
63.45
158.87
6,406.6
6,333.7
-7,795.6
2,695.6
5,957,933.0
351,596.1
0.2
8,240.04 MWD+IFR2+SAG+MS (4)
11,357.2
63.97
157.93
6,448.0
6,375.0
-7,873.5
2,726.4
5,957,854.5
351,625.4
1.1
8,323.76 MWD+IFR2+SAG+MS (4)
11,451.4
64.13
158.86
6,489.2
6,416.2
-7,952.2
2,757.6
5,957,775.2
351,654.9
0.9
8,408.42 MWD+IFR2+SAG+MS (4)
11,545.3
63.97
160.07
6,530.3
6,457.3
-8,031.3
2,787.2
5,957,695.6
351,682.9
1.2
8,492.82 MWD+IFR2+SAG+MS (4)
11,640.1
64.04
160.63
6,571.8
6,498.8
-8,111.5
2,815.9
5,957,614.8
351,710.0
0.5
8,577.96 MWD+IFR2+SAG+MS (4)
11,732.1
64.00
160.57
6,612.2
6,539.2
-8,189.5
2,843.4
5,957,536.2
351,735.9
0.1
8,660.66 MWD+IFR2+SAG+MS (4)
11,825.3
63.99
160.58
6,653.0
6,580.0
-8,268.5
2,871.2
5,957,456.7
351,762.1
0.0
8,744.35 MWD+IFR2+SAG+MS (4)
11,920.4
64.03
160.96
6,694.7
6,621.7
-8,349.2
2,899.4
5,957,375.4
351,788.7
0.4
8,829.72 MWD+IFR2+SAG+MS (4)
12,014.8
64.13
160.53
6,735.9
6,663.0
-8,429.4
2,927.4
5,957,294.7
351,815.0
0.4
8,914.55 MWD+IFR2+SAG+MS (4)
12/6/2019 9.53.06AM Page 5 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Co-ordinate Reference: Well CD5-26
Project:
Western North Slope
TVD Reference:
CD5-26
Actual @ 73.Ousft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-26
Actual @ 73.Ousft (D25)
Well:
CD5-26
North Reference:
True
Wellbore:
CD5-261-1
Survey Calculation Method:
Minimum
Curvature
Design:
CD5-261-1
Database:
EDT 14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
(°)
(°)
(Usti)
(usft)
(usft)
(usft)
(ft)
(ft)
(°I100')
(ft) Survey Tool Name
12,110.8
64.02
160.45
6,777.9
6,704.9
-8,510.8
2,956.2
5,957,212.8
351,842.2
0.1
9,000.84 MWD+IFR2+SAG+MS (4)
12,206.5
63.96
160.59
6,619.9
6,746.9
-8,591.9
2,984.9
5,957,131.2
351,869.3
0.1
9,086.78 MWD+IFR2+SAG+MS (4)
12,299.7
63.97
160.47
6,860.8
6,787.8
-8,670.8
3,012.8
5,957,051.7
351,895.6
0.1
9,170.42 MWD+IFR2+SAG+MS (4)
12,394.1
63.87
160.39
6,902.3
6,829.3
-8,750.7
3,041.2
5,956,971.2
351,922.4
0.1
9,255.18 MWD+IFR2+SAG+MS (4)
12,489.4
63.94
160.04
6,944.2
6,871.2
-8,831.3
3,070.2
5,956,890.1
351,949.7
0.3
9,340.76 MWD+IFR2+SAG+MS (4)
12,583.1
63.78
159.84
6,985.5
6,912.5
-8,910.3
3,099.0
5,956,810.5
351,977.0
0.3
9,424.85 MWD+IFR2+SAG+MS (4)
12,677.3
63.72
159.80
7,027.2
6,954.2
-8,989.6
3,128.2
5,956,730.7
352,004.5
0.1
9,509.29 MWD+IFR2+SAG+MS (4)
12,771.3
63.87
159.94
7,068.7
6,995.7
-9,068.7
3,157.2
5,956,651.0
352,031.9
0.2
9,593.56 MWD+IFR2+SAG+MS (4)
12,865.6
63.84
160.87
7,110.2
7,037.2
-9,148.5
3,185.6
5,956,570.7
352,058.7
0.9
9,678.16 MWD+IFR2+SAG+MS (4)
12,960.0
63.81
161.31
7,151.8
7,078.9
-9,228.6
3,213.0
5,956,490.0
352,084.6
0.4
9,762.76 MWD+IFR2+SAG+MS (4)
13,054.0
63.75
161.58
7,193.4
7,120.4
-9,308.6
3,239.9
5,956,409.5
352,109.8
0.3
9,847.03 MWD+IFR2+SAG+MS (4)
13,147.4
64.00
161.75
7,234.5
7,161.6
-9,388.2
3,266.3
5,956,329.4
352,134.6
0.3
9,930.75 MWD+IFR2+SAG+MS (4)
13,239.9
64.30
161.93
7,274.8
7,201.9
-9,467.2
3,292.2
5,956,249.8
352,158.9
0.4
10,013.77 MWD+IFR2+SAG+MS (4)
13,334.2
64.35
161.26
7,315.7
7,242.7
-9,547.9
3,319.0
5,956,168.6
352,184.1
0.6
10,098.65 MWD+IFR2+SAG+MS (4)
13,428.3
64.37
161.83
7,356.4
7,283.4
-9,628.4
3,345.9
5,956,087.7
352,209.3
0.5
10,183.33 MWD+IFR2+SAG+MS (4)
13,522.7
65.16
160.95
7,396.7
7,323.7
-9,709.3
3,373.1
5,956,006.2
352,235.0
1.2
10,268.60 MWD+IFR2+SAG+MS (4)
13,618.1
66.70
158.03
7,435.6
7,362.6
-9,790.9
3,403.7
5,955,924.0
352,263.8
3.2
10,355.72 MWD+IFR2+SAG+MS (4)
13,713.4
69.56
156.85
7,471.1
7,398.1
-9,872.5
3,437.6
5,955,841.7
352,296.1
3.2
10,444.10 MWD+IFR2+SAG+MS (4)
13,807.3
71.97
156.24
7,502.0
7,429.0
-9,953.8
3,472.9
5,955,759.8
352,329.8
2.6
10,532.69 MWD+IFR2+SAG+MS (4)
13,902.0
74.30
156.17
7,529.5
7,456.5
-10,036.7
3,509.4
5,955,676.1
352,364.6
2.5
10,623.23 MWD+IFR2+SAG+MS (4)
13,995.8
76.69
156.41
7,553.0
7,480.0
-10,119.9
3,545.9
5,955,592.3
352,399.5
2.6
10,713.99 MWD+IFR2+SAG+MS (4)
14,088.7
78.89
155.97
7,572.6
7,499.6
-10,203.0
3,582.6
5,955,508.5
352,434.5
2.4
10,804.74 MWD+IFR2+SAG+MS (4)
14,183.0
80.90
155.60
7,589.2
7,516.2
-10,287.7
3,620.7
5,955,423.0
352,470.8
2.2
10,897.53 MWD+IFR2+SAG+MS (4)
14,276.8
82.27
155.12
7,602.9
7,529.9
-10,372.0
3,659.4
5,955,338.0
352,507.8
1.5
10,990.14 MWD+IFR2+SAG+MS (4)
14,369.0
83.89
154.95
7,614.0
7,541.0
-10,454.9
3,698.0
5,955,254.2
352,544.8
1.8
11,081.52 MWD -INC _ONLY (INC>10°)(5)
14,384.4
84.62
155.67
7,615.5
7,542.6
-10,468.8
3,704.4
5,955,240.2
352,550.9
6.7
11,096.80 MWD-INC_ONLY (INC>10°) (5)
14,393.4
85.61
156.64
7,616.3
7,543.3
-10,477.1
3,708.0
5,955,231.9
352,554.3
15.3
11,105.83 MWD-INC_ONLY (INC>10°) (5)
14,485.4
88.94
156.54
7,620.7
7,547.7
-10,561.4
3,744.5
5,955,146.9
352,589.1
3.6
11,197.65 MWD-INC_ONLY(INC>10°)(5)
14,581.4
89.14
156.43
7,622.3
7,549.3
-10,649.4
3,782.8
5,955,058.1
352,625.7
0.2
11,293.59 MWD -INC -ONLY (INC>10°) (5)
14,678.8
89.13
156.32
7,623.8
7,550.8
-10,738.7
3,821.9
5,954,968.1
352,662.9
0.1
11,390.93 MWD+IFR2+SAG+MS (6)
14,773.8
89.84
155.28
7,624.6
7,551.6
-10,825.3
3,860.8
5,954,880.7
352,700.1
1.3
11,485.83 MWD+IFR2+SAG+MS (6)
14,869.9
89.49
152.52
7,625.2
7,552.2
-10,911.6
3,903.1
5,954,793.6
352,740.6
2.9
11,581.62 MWD+IFR2+SAG+MS (6)
14,964.8
90.91
153.87
7,624.8
7,551.9
-10,996.3
3,945.9
5,954,708.1
352,781.7
2.1
11,676.16 MWD+IFR2+SAG+MS (6)
15,059.4
90.80
152.38
7,623.4
7,550.5
-11,080.6
3,988.6
5,954,622.9
352,822.7
1.6
11,770.27 MWD+IFR2+SAG+MS (6)
15,154.2
89.90
150.18
7,622.9
7,549.9
-11,163.8
4,034.2
5,954,538.8
352,866.6
2.5
11,864.41 MWD+IFR2+SAG+MS (6)
15,250.0
88.87
151.77
7,623.9
7,550.9
-11,247.5
4,080.7
5,954,454.2
352,911.4
2.0
11,959.42 MWD+IFR2+SAG+MS (6)
15,344.9
89.69
149.46
7,625.1
7,552.1
-11,330.2
4,127.2
5,954,370.6
352,956.2
2.6
12,053.39 MWD+IFR2+SAG+MS (6)
15,440.4
90.03
149.93
7,625.3
7,552.3
-11,412.6
4,175.4
5,954,287.2
353,002.7
0.6
12,147.81 MWD+IFR2+SAG+MS (6)
15,534.5
90.59
154.13
7,624.8
7,551.8
-11,495.7
4,219.5
5,954,203.2
353,045.2
4.5
12,241.36 MWD+IFR2+SAG+MS (6)
15,627.0
90.59
153.13
7,623.8
7,550.9
-11,578.6
4,260.6
5,954,119.5
353,084.6
1.1
12,333.57 MWD+IFR2+SAG+MS (6)
12/6/2019 9:53:06AM Page 6 COMPASS 5000.14 Build 85H
Company:
Project:
Site:
Well:
Wellbore:
Design:
Survey
NADConversion
Western North Slope
CD5 Alpine West Pad
CD5-26
CD5-261-1
CD5-261-1
ConocoPhillips
Definitive Survey Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well CD5-26
CD5-26 Actual @ 73.Ousft (D25)
CD5-26 Actual @ 73.Ousft (D25)
True
Minimum Curvature
EDT 14 Alaska Production
1216/2019 9:53:06AM Page 7 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
DLS
Section
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(°/100')
(ft) Survey Tool Name
15,723.5
89.92
153.40
7,623.4
7,550.4
-11,664.8
4,304.0
5,954,032.6
353,126.3
0.7
12,429.61 MWD+IFR2+SAG+MS (6)
15,819.1
89.76
152.95
7,623.7
7,550.7
-11,750.1
4,347.2
5,953,946.4
353,167.7
0.5
12,524.88 MWD+IFR2+SAG+MS (6)
15,914.0
89.41
152.42
7,624.4
7,551.4
-11,834.5
4,390.7
5,953,861.2
353,209.5
0.7
12,619.34 MWD+IFR2+SAG+MS (6)
16,010.7
89.41
151.85
7,625.4
7,552.4
-11,919.9
4,435.9
5,953,774.8
353,253.0
0.6
12,715.48 MWD+IFR2+SAG+MS (6)
16,104.0
89.30
150.59
7,626.4
7,553.4
-12,001.7
4,480.8
5,953,692.2
353,296.3
1.4
12,808.02 MWD+IFR2+SAG+MS (6)
16,198.7
89.76
149.09
7,627.2
7,554.2
-12,083.6
4,528.4
5,953,609.4
353,342.2
1.7
12,901.69 MWD+IFR2+SAG+MS (6)
16,293.9
89.76
147.74
7,627.6
7,554.6
-12,164.6
4,578.2
5,953,527.4
353,390.4
1.4
12,995.41 MWD+IFR2+SAG+MS (6)
16,388.8
89.61
146.82
7,628.1
7,555.1
-12,244.5
4,629.5
5,953,446.5
353,440.0
1.0
13,088.56 MWD+IFR2+SAG+MS (6)
16,484.3
89.76
145.49
7,628.6
7,555.7
-12,323.8
4,682.7
5,953,366.1
353,491.6
1.4
13,181.95 MWD+IFR2+SAG+MS (6)
16,578.5
89.86
145.52
7,629.0
7,556.0
-12,401.4
4,736.1
5,953,287.4
353,543.4
0.1
13,273.77 MWD+IFR2+SAG+MS (6)
16,673.0
89.83
146.14
7,629.2
7,556.2
-12,479.6
4,789.1
5,953,208.2
353,594.9
0.7
13,366.05 MWD+IFR2+SAG+MS (6)
16,767.5
89.72
147.80
7,629.6
7,556.6
-12,558.9
4,840.7
5,953,127.9
353,644.8
1.8
13,458.74 MWD+IFR2+SAG+MS (6)
16,859.7
89.90
148.24
7,629.9
7,556.9
-12,637.0
4,889.5
5,953,048.8
353,692.0
0.5
13,549.36 MWD+IFR2+SAG+MS (6)
16,955.6
89.79
148.94
7,630.1
7,557.2
-12,718.9
4,939.4
5,952,966.0
353,740.3
0.7
13,643.89 MWD+IFR2+SAG+MS (6)
17,048.7
89.75
150.04
7,630.5
7,557.5
-12,799.1
4,986.7
5,952,884.8
353,786.0
1.2
13,735.94 MWD+IFR2+SAG+MS (6)
17,144.3
89.85
149.83
7,630.9
7,557.9
-12,881.9
5,034.6
5,952,801.1
353,832.2
0.2
13,830.55 MWD+IFR2+SAG+MS(6)
17,235.2
90.35
151.03
7,630.7
7,557.7
-12,960.9
5,079.5
5,952,721.2
353,875.5
1.4
13,920.54 MWD+IFR2+SAG+MS (6)
17,331.7
89.89
152.45
7,630.5
7,557.5
-13,045.9
5,125.2
5,952,635.3
353,919.5
1.5
14,016.45 MWD+IFR2+SAG+MS (6)
17,424.9
89.65
150.88
7,630.9
7,557.9
-13,127.9
5,169.4
5,952,552.4
353,962.0
1.7
14,108.99 MWD+IFR2+SAG+MS (6)
17,520.6
89.38
151.62
7,631.7
7,558.7
-13,211.8
5,215.4
5,952,467.6
354,006.3
0.8
14,203.93 MWD+IFR2+SAG+MS (6)
17,617.1
89.31
152.59
7,632.8
7,559.8
-13,297.1
5,260.6
5,952,381.4
354,049.8
1.0
14,299.88 MWD+IFR2+SAG+MS (6)
17,710.6
89.44
152.78
7,633.8
7,560.8
-13,380.1
5,303.5
5,952,297.6
354,091.0
0.2
14,392.87 MWD+IFR2+SAG+MS (6)
17,805.7
89.85
154.58
7,634.4
7,561.4
-13,465.4
5,345.6
5,952,211.5
354,131.4
1.9
14,487.63 MWD+IFR2+SAG+MS (6)
17,870.3
90.24
156.04
7,634.3
7,561.4
-13,524.1
5,372.6
5,952,152.3
354,157.2
2.3
14552.21 MWD+IFR2+SAG+MS (6)
17,932.0
90.24
156.04
7,634.1
7,561.1
-13,580.5
5,397.7
5,952,095.4
354,181.1
0.0
14,613.84 MWD+IFR2+SAG+MS (6)
1216/2019 9:53:06AM Page 7 COMPASS 5000.14 Build 85H
P%D ;klq —ieg
Loepp. Victoria T (CED)
From: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-
Sherrod@contractor.conocophillips.com>
Sent: Tuesday, December 31, 2019 11:16 AM
To: Loepp, Victoria T (CED)
Subject: RE: [EXTERNAL]Re: Extension of time for CD5-26 and CD5-261-1
Follow Up Flag: Follow up
Flag Status: Flagged
Thank you and have a safe and Happy New Year! E 9
From: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Sent: Tuesday, December 31, 2019 10:53 AM
To: Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-Sherrod@contractor.conocophillips.com>
Subject: [EXTERNAL]Re: Extension of time for CD5-26 and CD5-261-1
Ann,
Extension is granted for 1 week to Jan 10,2020.
Happy New Year Ann!
Victoria
Sent from my Whone
On Dec 31, 2019, at 10:39 AM, Haggerty -Sherrod, Ann (Northland Staffing Services) <Ann.Haggerty-
Sherrod@contractor.conocophillips.com> wrote:
Good morning,
I am writing to ask for an extension of time on the due date for CD5-26 and CD5-261-1 which is currently
due on Friday, January 3, 2020. Many of the engineers involved in supplying data for the 10- 407 are out
on vacation and not due to return until 1/6/20. 1 just returned from vacation on 2/30 but the person
filling in for me did ask for the data we needed but I think people were already gone for vacation —
taking that time off that could not be carried over to the new year.
Any extension you can give us would be greatly appreciated.
Thanks,
Ann
Schlumberger
Drilling & Measurements
Product Delivery
Customer: ConocoPhillips Alaska, Inc. Dispatched To:
Well Name: CD5-26L1 Date Dispatched
Service Order #: 19AKA0087
21 9108
31625
Transmittal #: 10DEC19-SP02
AOGCC: Natural Resource Tech
10 -Dec -19
Dispatched By: Stephanie Pacillo
Product
I Description
Hardcopy
Digital Copy
Logging Date
LWD Recorded Mode
Prints:
N/A
Contents on CD
18 -Nov -19
Scope*Service
2" MD / TVD
x
5" MD / TVD
x
R
CEIVE
EC 10 2019
OGCC
Digital Data
N/A
Contents on CD
DLIS / LAS Data
x
Surveys
N/A
Contents on CD
Directional Survey Nad27
x
Directional Survey Nad83
x
CD
1 CD
Contents on CD
Data: DLIS/ LAS
x
Graphics: PDF
x
Surveys: PDF/TXT
x
Please sign and email a copy to: Please sign and email a copy to:
Tom.Osterkamp(a)conocophillips.com Alaska PTSPrintCenter(a)slb.com
Attn: Tom Osterkamp Attn: Stephanie Pacillo
A±(,� (I
Received By: I
THE STATE
'ALASKA
GOVERNOR MIKE DUNLEAVY
Chip Alvord
Drilling Manager
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.claska.gov
Re: Colville River Field, Alpine Oil Pool, CRU CD5-26L1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 219-108
Surface Location: 438' FNL, 2919' FEL, SEC. 18, TI IN, R4E, UM
Bottomhole Location: 3404' FNL, 2616' FEL, SEC. 4, TI ON, R4E, UM
Dear Mr. :
Enclosed is the approved application for the permit to redrill the above referenced development
well.
The permit is for a new wellbore segment of existing well Permit No. 219-107, API No. 50-103-
20806-00-00. Production should continue to be reported as a function of the original API number
stated above.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
4--/�
Daniel T. Seamount, Jr.
Commissioner
DATED this t -S-- of August, 2019.
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
PERMIT TO DRILL
20 AAC 25.005
'e
JUS. L Q go
1a. Type of Work:
b. Proposed Well Class: Exploratory - Gas ❑
Service - WAG ❑ Service - Disp ❑
1c. Specify if well is proposed for:
DrillLateral ti
Stratigraphic Test ❑ Development - Oil L]'
Service - Winj ❑ Single Zone ❑✓ '
Coalbed Gas 11`"Ga" 'Hyffrates El
Redrill Reentry ❑
Exploratory - Oil ❑ Development - Gas ❑
Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket Q Single Well ❑
11. Well Name and Number:
ConocoPhillips
Bond No. 59-52-180
CRU-CD5-26L1 '
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, Alaska, 99510-0360
MD: 29814 TVD: 7804
Colville River Unit
Alpine Pool
4a. Location of Well (Governmental Section):
7. Property Designation:
Surface: 438' FNL, 2919' FEL, Sec. 18, T11N, R4E, UM
ASRC-NPR4,ASRC-AA092344,ASRC-NPR2
Top of Productive Horizon:
8. DNR Approval Number:
13. Approximate Spud Date:
90' FNL, 4681' FEL, Sec. 29, T11 N, R4E, UM
932669, 340757, 932128
8/10/2019 9- Za' "'! -`
Total Depth:
9. Acres in Property:
14. Distance to Nearest Property:
3404' FNL, 2616' FEL, Sec. 4, T10N, R4E, UM
5032, 3122, 8719, 3200
4695' to ASRC-NPR5
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 74.5 '
15. Distance to Nearest Well Open
Surface: x- 349057 y- 5965780 f Zone- 4
GL / BF Elevation above MSL (ft): 33.7
to Same Pool: 1542' CD5-25L1
16. Deviated wells: Kickoff depth: feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Maximum Hole Angle: ax90 degrees
Downhole: 3950 • Surface: 3169
18. Casing Program: Specifi ations
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight I Grade Coupling Length
MD TVD MD TVD (including stage data)
42" 20" 78.6 B Welded 79
41 41 120 120 10 yds
13.5" 10.75" 45.5 L-80 TXP 2206
41 41 2247 2189 978sx 11.0ppg, 271 s 15.8ppg G
9.875x11" 7.625" 29.7 L-80 TXP 14054
41 41 14095 7575 978sx 15.8ppg Class G
6.5" 4.5" 12.2 L-80 T -Blue 15714
14100 7575 29814 7804 Lined with blank pipe and frac ports
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):
Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
Casing Length Size
Cement Volume MD TVD
Conductor/Structural
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Hydraulic Fracture planned? Yes[-] No ❑✓
20. Attachments: Property Plat ❑ BOP SketchDrilling
Program Time v. Depth Plot Shallow Hazard Analysis
e e
Diverter Sketch
E] Seabed
Report Drilling Fluid Program 20 AAC 25.050 requirementse
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Contact Name: Matt Smith
Authorized Name: Chip Alvord
Contact Email: matt.smithUftop.com
Authorized Title: Drilling Manageer%r��
Contact Phone: 907-263-4324
/
( ft
Authorized Signature: I< -1. t
Date:
Commission Use Only
Permit to Drill /--n�
API Number-,,-,, �/ /
'tC1�-
Permit Approval
(
1q
See cover letter for other
Number:
50-
ate:
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, as hydrates, or gas contained in shales:Fer
Other: /?0 {J fps f f p �? Jt da ��
SSam fps req'd: Yes ❑ o [Tt� Mud log req'd: Yes ❑ o [�
5W Y No
// a r rt t�C fC✓ � t Z
)Q,. me res: Yes
❑� Directional svy req'd: Yes [vNo ❑
Spacing
exception req'd: Yes E] No Lti J Inclination -only svy req'd: Yes ❑ NoF�r'
Post initial injection MIT req'd: Yes ❑ NoL�
APPROVED BY �'�`� �y
Approved by4v��
COMMISSIONER THE COMMISSION Date: / l
Form 10-401 Revised 5/2017 This permit is valid for 24 months from the date of approval per 20 AAC 25.005(g)
ORIGINAL d"010'0�1'17
Submit Form and
Attachments in Duplicate
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
July 25, 2019
Alaska Oil and Gas Conservation Commission
333 West Th Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill CRU CD5-26L1
Dear Sir or Madam:
ConocoPhillips
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig
Doyon 25. The intended spud date for this well is 9/28/2019.
CRU CD5-26L 1 is planned to be an Alpine C Sand upper lateral producer out of the CD5-26 parent well (covered in separate
PTD). When the CD5-26L 1 is commenced, the parent well will have run and cemented 10-3/4" surface casing to above the
C30 Sand. 7-5/8" intermediate casing will have been run and cemented to 250' TVD above the uppermost hydrocarbon
bearing interval. A 6-1/2" lateral will have been drilled in the Alpine A Sand and lined with a 4-1/2" liner, with a whipstock
set above for the CD5-26L 1 kickoff in the Alpine C Sand.
The CDS-26L 1 lateral will then be drilled in the Alpine C Sand and partially lined with 4-1/2" liner. The well will be
completed with a 4-1/2" upper completion. A waiver is requested to set the production acke approximately 1,000' above the
casing shoe as per 20 AAC 25.412(b). n p W I`Vte� ti z�C�'7
-rh i 513 ri-c q ki r "i -�- G fa
Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information
attached to this application includes the following:
1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a)
2. A proposed drilling program
3. A proposed completion diagram
4. A drilling fluids program summary
5. Pressure information as required by 20 AAC 25.035 (d)(2)
6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b)
Information pertinent to the application that is presently on file at the AOGCC:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20
AAC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser set up.
If you have any questions or require further information, please contact Greg Hobbs at 263-4749
(greg.s.hobbs@ConocoPhillips.com) or Chip Alvord at 265-6120.
Sincerely, cc:
Matthew Digitally signed by CD5-26L1 Well File/ Ann Haggerty -Sherrod ATO 1530
Matthew Smith Johnson N oku ATO 1720
Smith Date: 2019.07.29 �
12:13:07-0a'00' Chip Alvord ATO 1570
Matt Smith Katheryn Hoffineister ATO 1760
Drilling Engineer Lanston Chin Kuukpik Corp
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
CD5-26L1
Application for Permit to Drill Document
ConocoPhillips
Table of Contents
1. Well Name (Requirements of 20 AAC 25.005 ()9)............................................................ 3
2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................3
Requirements of 20 AAC 25.050(b)............................................................................................................. 3
3. Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3)) 3
4. Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) .........................4
5. Procedure for Conducting Formation Integrity Tests (Requirements of'20AAC 25.005
(e) (5)).......................................................................................................................... 5
6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))...........5
7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7)) ..........................5
8. Drilling Fluid Program (Requirements of 20 AAC 25.005(c)(8)) .................................... 6
9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9))
................................................................................................................................... 7
10. Seismic Analysis (Requirements of'20AAC 25.005 (c)(10)) ..........................................7
11. Seabed Condition Analysis (Requirements of 20 AAC 25.005 (c)(11)) .........................7
12. Evidence of Bonding (Requirements of20 AAC 25.005 (c)(12)) ...................................7
13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) .........................7
14. Discussion of Mud and Cuttings Disposal and Annular Disposal .......................8
(Requirements of 20 AAC 25.005 (c)(14))............................................................................. 8
15. Attachments................................................................................................................8
Attachment I Cement Summary.................................................................................................................. 8
CD5-26L1 APD
Page 1 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
Attachment 2 Drilling Hazards Summary.................................................................................................... 8
Attachment 3 Completion Schematic........................................................................................................... 8
Attachment 4 Directional Plan...................................................................................................................8
CD5-26L1 APD
Page 2 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
1. Well Name (Requirements of 20 AAC 25.005 (fl)
The well for which this application is submitted will be designated as CRU CD5-26L1
2. Location Summary (Requirements of20AAC25.005(c)(2))
Location at Surface 438' FNL, 2919' FEL, Sec. 18, TI IN, ME, UM
NAD 1927 RKB Elevation
74.5' AMSL
Northings: 5,965,780
Total Vertical Depth, RKB: 7,804'
Eastings: 349,057 Pad Elevation
33.7' AMSL
Top of Productive Horizon Heel 90' FNL, 4681' FEL, Sec. 29, T1IN, ME, UM
NAD 1927 Measured Depth, RKB: 14,095
Northings: 5,955,499 Total Vertical Depth, RKB: 7,575'
Eastings: 352,409 Total Vertical Depth, SS: 7,500'
Total Depth Toe
3404' FNL, 2616' FEL, Sec. 4, TI ON, ME, UM
NAD 1927
Northings: 5,941,489
Eastings: 359,528
Measured Depth, RKB: 29,814
Total Vertical Depth, RKB: 7,804'
Total Vertical Depth, SS: 7,729'
Requirements of 20 AA 25.050(b)
Please see Attachment 4: Directional Plan
The Applicant is the only affected owner.
3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3))
Please reference BOP and diverter schematics on file for Doyon 25.
CD5-26L 1 APD
Page 3 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-26L1
Saved: 29 -Jul -19
4. Drilling Hazards Information (Requirements of20 AAC 25.005 (c)(4))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size
in
Csg Setting Depth
MD/TVD ft
Fracture
Gradient(psi)si
Pore pressure
ASP Drilling
20
120/ 120
10.9
51
56
10.75
2,247 / 2,189
14.5
964
1,432
7.625
15,280 / 7,713
12.5
3,950
3 169
4.5
29,814 / 7,804
12.5
3,950
n/a
PROCEDURE FOR CALCULATING ANTICPATED SURFACE PRESSURE (ASP)
ASP is determined as the lesser of 1) surface pressure at breakdown of the formation casing seat with a gas gradient
to the surface, or 2) formation pore pressure at the next casing point less a gas gradient to the surface as follows:
1) ASP = [(FG x 0.052) - o.l]*D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from lb./gal to psi/ft
0.1 =Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP =FPP - (0.1 x D)
Where: FPP = Formation Pore Pressure at the next casing point
FPP = 0.4525 x TVD
1. ASP CALCULATIONS
Drilling below 20" conductor
ASP = [(FG x 0.052) - 0.1] D
_ [(10.9 x 0.052) - 0.1 ] x 120 = 56 psi
OR
ASP = FPP - (0.1 x D)
= 964 - (0.1 x 2189') = 745 psi
Drilling below 10-3/4" surface casing
ASP = [(FG x 0.052) - 0.1] D
_ [(14.5 x 0.052) - 0.1] x 2189' = 1432 psi
OR
ASP= FPP-(0.1 x D)
= 3950 - (0.1 x 7713') = 3175 psi
Drilling below 7-5/8" intermediate casing
ASP = [(FG x 0.052) - 0.1] D
_ [(12.5 x 0.052) - 0.1] x 7713 = 4268 psi
OR
ASP = FPP - (0.1 x D)
= 3950- (0.1 x 7804') = 3169 psi
CD5-260 APD
Page 4 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-26L1
Saved: 29 -Jul -19
(B) data on potential gas zones;
The well bore is not expected to penetrate any gas zones.
(C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation
zones, and zones that have a propensityfor differential sticking;
Please see Attachment 2 - Drilling Hazards Summary
5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC25.005 (c)(s))
Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that
ConocoPhillips Alaska has on file with the Commission.
6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))
Casing and Cementin
Y, Program
Csg,,Tbg
Hole
Size
Weight
Grade
Conn.
Length
Top MD/'TVD
Btm MD7TVD
Cement Program
OD (in)
(Iblft)
(ft)
(ft)
(ft)
20
42
94
H-40
Welded
80
41/41
120/ 120
10 yards
Cement to Surface with
10.75
13.5
45.5
L-80
TCM
2,206
41/41
2,247 / 2,189
978 sx DeepCrete Lead 11.0 ppg,
271 sx Class G Tail Slurry 15.8 ppg
7.625
X875
29.7
L-80
BTCM
15,239
41/41
15,280 / 7,713
978 sx of Class G at 15.8 ppg
4.5
6.5
12.2
L-80
Blue
18,604
14,100 / 7,575
29,814 / 7,808
No cement, Perforation Sub
7. Diverter System Information (Requirements of 20 AAC 25.005(c)(7))
It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, more than
twenty-four penetrations have been completed and there has not been a significant indication of shallow gas or gas
hydrates above the C30 where casing will be set.
CD5-26L1 APD
Page 5 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-26L1
Saved: 29 -Jul -19
8. Drilling Fluid Program (Requirements of 20AAC25.005(c)(8))
Production Hole:
The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 —
9.5 ppg with calcium carbonate and KCI and utilize MPD for adding backpressure during connections.
Diagram of Doyon 25 Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033.
CD5-26L1 APD
Page 6 of 13
Printed: 29 -Jul -19
Surface
Intermediate
Production
Hole Size
in.
13.5
9.875 x 11
6.5
Casing Size
in.
10.75
7.625
4.5
Density
PPG
9.0-10.0
9.6— 10.8
8.8-9.5
PV
cP
30-80
10
10
YP
Ib./100 ftz
100-200
20- 28
10- 15
Funnel Viscosity
s/qt.
300
50-60
40-50
Initial Gels
Ib./100 ftz
50
10
6
30 Minute Gels
Ib./100 ft2
60
15
8
API Fluid Loss
cc/30 min.
N.C. — 15.0
5.0
4.0
HPHT Fluid Loss
cc/30 min.
n/a
8.0— 12.0
10.0
pH
11.0
9.5-10.0
9.0-9.5
Production Hole:
The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 —
9.5 ppg with calcium carbonate and KCI and utilize MPD for adding backpressure during connections.
Diagram of Doyon 25 Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033.
CD5-26L1 APD
Page 6 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis (Requirements of20 AAC 25.005 (c)(11))
N/A - Application is not for an offshore well.
12. Evidence of Bonding (Requirements of 20 AAC 25.005 (c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13))
The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic.
1. End PTD for CD5-26 and begin PTD for CD5-26L1.
2. Pick up and run in hole with 6-1/2" drilling BHA.
3. Drill 6-1/2" hole to section TD (LWD Program: GR/RES)
4. Pull out of hole with drilling BHA.
5. Run 4.5" perforated pup liner, plop and drop in Alpine C lateral.
6. Run in hole whipstock retrieval BHA and retrieve whipstock.
7. RIH with 4.5" tubing with Baker Premier production packer.
NOTE: A waiver is requested to set the production packer approximately 1000' MD above
the intermediate casing shoe as per 20 AAC 25.412(b). This is to set the packer above the C
sand window and maintain slickline accessibility to secure the well in the future.
8. Space out and land hanger.
9. Pressure test hanger seals to 5000 psi.
10. Drop ball and rod to set production packer, test tubing to 4,200 psi, chart test.
11. Bleed tubing pressure to 2,200 psi and test IA to 3,850 psi, chart test.
12. Install HP-BPV and test to 2,500 psi.
13. Nipple down BOP.
14. Install tubing head adapter assembly. N/U tree and test tree to 5000 psi/]0 minutes.
15. Freeze protection tubing and annulus.
16. Secure well. RDMO.
CD5-26L 1 APD
Page 7 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261_1
Saved: 29 -Jul -19
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
(Requirements of 20 AAC 25.005 (c)(14))
Incidental fluids developed from drilling operations on well CD5-26 will be injected into a permitted surface casing
x production casing annulus on CD5.
The CD5-26 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand
based on pre -drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir.
Once CD5-26 has been drilled and completed, consideration may be given to permit this well for annular injection.
An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to
drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any
zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no
USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the
enclosed directional drilling plan for other formation markers in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are
part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the
specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling
fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular
injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
= (12.0 ppg) * (0.052) * (2,189') + 1,500 psi
= 2,866 psi
Pore Pressure = 1,049 psi
Th erefore
Differential = 2,866 — 1,049 = 1,817 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations have
sufficient strength by using the 85% collapse and burst ratings listed in the following table:
OD
Wt
Grade
Range
Connection
Collapse
85% of
Burst
85% of
(ppf)
Type
Collapse
Burst
10-3/4"
45.5
L-80
3
HYD563/BTCM
2470 psi
2100 psi
5210 psi
4429 psi
7-5/8"
29.7
L-80
3
HYD563/BTCM
4790 psi
4071 psi
6890 psi
5856 psi
15. Attachments
Attachment 1 Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Directional Plan
CD5-26L1 APD
Page 8 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
Attachment 1 — Cement Summary
CD5-26L1 Cementing Program:
CD5-26 Cement Schematic
9-7/8" x 11" Hole
20" 94# H-40 Welded
Conductorto 115
10-3/4" 45,5# L-80 HYD5631BTCM
2,247 MD 12,189' TVD @ 31° inc.
Top of Cement
12,936 MD 17,120' TVD
Kuparuk C
13, 510' M D 17, 370' TV D
KOP in Alpine C
Alpine 14,09514
14,092' MD 17,574' TVD ,
4
7-518" 293 L-80 HYD563 X BTCM
Alpine A `, Casing
16,025' MD 17,767' TVD \\ 15,28010 / 7,713' TVD @ 84°
\
4 \
� r
f I \
C D5-26 A Sand 6-1/2" Hole i CD5-26L 1 C Sand 6-1/2" Hole
33,734'MD17,874@89' :� 29,814'MD17,804@89'
CD5-26L1 APD
Page 9of13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
10.75" Surface Casing run to 2,247' MD / 2,189' TVD
Cement from 2247' MD to 1747'(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 174' to surface with
11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost
(1325' MD), zero excess in 20" conductor.
Lead slurry from 1,747' MD to surface with Arctic Lite Crete @ 11.0 ppg
Conductor
(120'- 41� X 1.3645 ft3/ft X 1.0 (0% excess) = 108 ft3
Permafrost to Conductor
(1,325'- 120') X 0.3637 ft3/ft X 3.5 (250% excess) = 1,547 ft3
Top of Tail to Permafrost
(1,747'- 1,325') X 0.3637 ft3/ft X 1.5 (50% excess) = 232 ft3
Total Volume = 108 + 1,547 + 232 = 1,887 ft3 => 978 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk
Tail slurry from 2,247' MD to 1,747' MD with 15.8 ppg Class G + additives
Shoe to Top of Tail
(2,249' -1,747 X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3
Shoe Joint
(80� X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft3
Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer,
0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk
7.625" Intermediate Casing run to 15,318' MD / 7,760' TVD
Top of slurry is designed to be at 12,936' MD, which is 250' TVD above the prognosis shallowest hydrocarbon
bearing zone Kuparuk C. Assume 40% excess annular volume.
* 1 I" Under reamer is 90' above the 9-7/8" bit.
Tail slurry from 15,280' MD to 12,9736' MD with 15.8 ppg Class G + additives
Shoe to top of 9-7/8" Hole
(15,280'- 15,200 X 0.2148 ft3/ft X 1.40 (40% excess) = 27 ft3
11"Hole to to Top of Cement
ft(15,200'- , 12,936 X 0.3428 ft3/ft X 1.40 (40% excess) = 1,086
Shoe Joint
(80� X 0.2578 ft3/ft X 1.0 (0% excess) = 21 ft3
Total Volume = 27+1,086 + 21 = 1134 ft3 => 978 sx of 15.8 ppg Class G + 0.2% D046
antifoamer, 0.3% D065 dispersant and 0.8% S002 accelerator @ 1.16 ft3/sk
CD5-26L1 APD
Page 10 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
Attachment 2 — Drilling Hazards Summary
(To be posted in Rig Floor Doghouse Prior to Spud)
13-1/2" Hole / 10-3/4" Casing Interval
Event
Risk Level
I Mitigation Strategy
Conductor Broach
Low
Monitor cellar continuously during interval.
Well Collision
Low
Gro single shots, traveling cylinder diagrams
Monitor well at base of permafrost, increased mud weight, decreased
Gas Hydrates
Low
mud viscosity, increased circulating times, controlled drilling rates,
Abnormal Reservoir Pressure
Low
low mud temperatures
Running Sands and Gravel
Low
Maintain planned mud parameters, Increase mud weight, use
Hydrogen Sulfide gas
Low
weighted sweeps.
Lost Circulation
Low
Reduced pump rates, mud rheology, lost circulation material, use of
low density cement slurries
9-7/8" x 11" Hole / 7-5/8" Casing Interval
Event
Risk Level
Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time equivalent
Lost circulation
Low
circulating density (ECD) monitoring, mud rheology, lost circulation
material
Hole swabbing on tris
Low
Annular pressure applied by managed pressure drilling equipment.
Abnormal Reservoir Pressure
Low
Well control drills, increased mud weight. No mapped faults occur
across the path of the planned wellbore.
Hydrogen Sulfide gas
Low
H2S drills, detection systems, alarms, standard well control practices,
mud scavengers
6-1/2" Open Hole Production Interval
Event
Risk Level
I Mitigation Strategy
Reduced pump rates, reduced trip speeds, real time equivalent
Lost circulation
Low
circulating density (ECD) monitoring, mud rheology, lost circulation
material
Hole swabbing on tris
Low
Annular pressure applied by managed pressure drilling equipment.
Abnormal Reservoir Pressure
Low
Well control drills, increased mud weight.
H2S drills, detection systems, alarms, standard well control practices,
Hydrogen Sulfide gas
Low
mud scavengers
CD5-26L 1 APD
Page 11 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
Well Proximitv Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following
attachments.
Drilling Area Risks:
Reservoir Pressure: Offset production has the potential to reduce the reservoir pressure. LCM material will be on
location to deal with losses.
Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the
intermediate section.
Lower Shale Stability: HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud
weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore
strengthening pills are expected to be effective in dealing with lost circulation if needed.
CD5-26L1 APD
Page 12 of 13
Printed: 29 -Jul -19
Application for Permit to Drill, Well CRU CD5-261-1
Saved: 29 -Jul -19
Attachment 3 — Completion Schematic (includes Alpine C lateral, as detailed in CD5-261-1 PTD)
CD5 - 26 Alpine AIC Dual Lateral Producer
Proposed Schematic
C sand Lateral
4-l' x 1" GLM 6 1l2' Hole TD
14,095'- 29,814' MD
--————————————————————————————————————— — — — — —
I
4 Yr" 12.6# L-80 Hyd 563 Liner wi pert pups
0 0 0 0 0 0 o I
i
y------------------------------------------I
Upper TNT Packer
4-'" 12.6# L-80 Hyd563 Liner wl frac ports
HP Sliding sleeve for /
Selectivity 0 0 o 0 0 0 0 o o ID
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
I
3-1f2" 9.3#TN110SS TNT Production Packer Asand Lateral
at 6 1/2" Hole TD
14,650' MD ZXP liner top packer 15,280'— 33,734' MD
at 15.130' MD
CD5-26L1 APD
Page 13 of 13
Printed: 29 -Jul -19
I
20" 94# HA0 Welded Upper Completion:
Conductor to 115' MD 1) 4 f°-126# Hyd 563 tubing
I
2) Shallow nipple profile 3.813" ID
I
3) 4-X' x 1" Camco KBMG GLM (xx') vr1DCK2
I
pinned for 2500 psi casing to tbg sheaf
4) TNT Packer
5) X Nipple profile, 2.813"
I
6) TNT Packer
I
7) X Nipple profile, 2.813"
I
10-314" 45.5# L-80 HYD 563 x Lower Completion:
I
BTC 8) Plop and drop liner in C sand
Surface Casing at 2,247' MD - no junction
-4.5" 12.6# L-80 wl pert pups
I
9) ZXP liner top packer & Flexlock Liner Hanger
4-f' x 1" GLM XO 5" Hydril 521 Box X 4-Y,' H563 pin
I
I
I
-4.5" Hydril563 12.6# L-80 wl Frac Ports
I
I
I
I
I
4-1 r2" 12.6# L-80 Hyd 563
I
I
I
I
I
4-V x 1" GLM
I
I
7 518" 29.7# L-80 TXP
I
Intermediate Casing at 15,280' MD
I
I
I
39# at heel
C sand Lateral
4-l' x 1" GLM 6 1l2' Hole TD
14,095'- 29,814' MD
--————————————————————————————————————— — — — — —
I
4 Yr" 12.6# L-80 Hyd 563 Liner wi pert pups
0 0 0 0 0 0 o I
i
y------------------------------------------I
Upper TNT Packer
4-'" 12.6# L-80 Hyd563 Liner wl frac ports
HP Sliding sleeve for /
Selectivity 0 0 o 0 0 0 0 o o ID
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
I
3-1f2" 9.3#TN110SS TNT Production Packer Asand Lateral
at 6 1/2" Hole TD
14,650' MD ZXP liner top packer 15,280'— 33,734' MD
at 15.130' MD
CD5-26L1 APD
Page 13 of 13
Printed: 29 -Jul -19
11:55, July 25 2019 1
DDI
r
300
CD5-26U wp07
15120 - 15320
10320 - 15510
7.361
Plan
Summar
-`.
15510 - 15700
Q) 5
7-5/8 x 9-7/8
CoP DE
15700 - 16290
U)
m
4-1/2 x 6-3/4
I
6880 - ,7460
o
1
17460 - ,8050
70
90
18050 - 18640
/
18640 - 19220
ance -
I
!1
19220 - ,9810
-
0
19810 - 20400
16875 20250 23625 27000 30375
6
20400 - 21580
21580 - 22750
o Measured Depth
Plan D25 @ 74.50usft (D25)
L O
7-5/8 x 9 7/8
N
po 0 0. 0 0 4-1/2 x 6-3/4
n q 0 0 0 0 0 0 0'o
0
N N CV N u7 O ^ O O
> O
on
'.
�•
_..
0
0 14350
10500 14000 17500 21000 24500 28000 3150
330
30
14350 - 14540
Horizontal Departure
90
CD5-26 07
14540 - 14740
14740 - 14930
14930 - 15120
O
`( GDS 26 wp0
I
455 -- --------------- ----------- ----- - - -- --- - _
a� I
CD5-26p0
028 f.._..
Equivalent Magnetic Dist
d
0 -
14300 14400 14500 14600 14700 14800 14900 15000 240 120 22750 -- 23930
23930 - 25110
Measured Depth 9 25110 - 26290
26290 27460
m
Depth FroDepth To Survey/Plan Tool 210 i 150 27460 --" 28640
40.80 2200.00 CD5-26 wp07 (CD5-26) GYD-GC-SS 28640 29815
2200.0014350.00 CD5-26 wp07 (G05-26) MWD+IFR2+SAG+MS 180
14350.0014750.00 CD5-26L1 wp07 (CD5-26L1) MWD -INC ONLY (INC>10D TVD MD Name
14750.0016250.00 CD5-26L1 wp07 (CD5-26L1) MWD OWSG 7617.84 14351.00 7-5/8 x 9-7/6
14750.00 29814.46 CD5-26L1 wp07 (CD5-26L1) MWD+IFR2+SAG+MS 7804.50 29814.56 4-1/2 x 6-3/4 Magnetic Model & Date: BGGM2018 01 -Nov -19
Magnetic North is 15.890 East of True North (Magnetic Declination)
Magnetic Dip & Field Strength: 80.71 ° 57361 nT
Sec MD Inc Azi TVD +N/ -S +FJ -W Dleg TF.. VSect Target Annotation
1 14350.00 84.09 152.00 7617.75 -10435.52 3678.33 0.00 0.00 11021.75 KOP: 16'/100' DLS, 25° TF, for 13' Lithology Column
214363.00 85.98 152.89 7618.88 -10447.00 3684.32 16.00 25.0011034.69 Hold for 20'
314383.00 85.98 152.89 7620.28 -10464.76 3693.42 0.00 0.0011054.62 Start 4°/100' DLS, -15.73° TF, for 134.25
414517.25 91.15 151.43 7623.64 -10583.39 3756.07 4.00 -15.7311188.54 Hold for 56.84'
514574.09 91.15 151.43 7622.50 -10633.29 3783.25 0.00 0.0011245.22 CD5-2611 Tgt 01 Start 1'/100' DLS, 165.39° TF, for 190.67'
614764.76 89.30 151.91 7621.75 -10801.12 3873.72 1.00 165.3911435.45 Hold for 15049.81'
729814.56 89.30 151.91 7804.50 -24077.40 10959.17 0.00 0.0026454.20 CD5-2611 Tgt 02 TD: 29614.56' MD, 7804.5' TVD
I
I
I By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all
I surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit packl
y approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a
1 100 feet lateral tolerance.
repared by
Checked by
r
300
-6 60
15120 - 15320
10320 - 15510
S. DeLapp
V. Osara
15510 - 15700
J. Ryan
CoP DE
15700 - 16290
3
16290 16880
6880 - ,7460
1
17460 - ,8050
70
90
18050 - 18640
/
18640 - 19220
ance -
!1
19220 - ,9810
-
/ 1
/
19810 - 20400
6
20400 - 21580
21580 - 22750
14300 14400 14500 14600 14700 14800 14900 15000 240 120 22750 -- 23930
23930 - 25110
Measured Depth 9 25110 - 26290
26290 27460
m
Depth FroDepth To Survey/Plan Tool 210 i 150 27460 --" 28640
40.80 2200.00 CD5-26 wp07 (CD5-26) GYD-GC-SS 28640 29815
2200.0014350.00 CD5-26 wp07 (G05-26) MWD+IFR2+SAG+MS 180
14350.0014750.00 CD5-26L1 wp07 (CD5-26L1) MWD -INC ONLY (INC>10D TVD MD Name
14750.0016250.00 CD5-26L1 wp07 (CD5-26L1) MWD OWSG 7617.84 14351.00 7-5/8 x 9-7/6
14750.00 29814.46 CD5-26L1 wp07 (CD5-26L1) MWD+IFR2+SAG+MS 7804.50 29814.56 4-1/2 x 6-3/4 Magnetic Model & Date: BGGM2018 01 -Nov -19
Magnetic North is 15.890 East of True North (Magnetic Declination)
Magnetic Dip & Field Strength: 80.71 ° 57361 nT
Sec MD Inc Azi TVD +N/ -S +FJ -W Dleg TF.. VSect Target Annotation
1 14350.00 84.09 152.00 7617.75 -10435.52 3678.33 0.00 0.00 11021.75 KOP: 16'/100' DLS, 25° TF, for 13' Lithology Column
214363.00 85.98 152.89 7618.88 -10447.00 3684.32 16.00 25.0011034.69 Hold for 20'
314383.00 85.98 152.89 7620.28 -10464.76 3693.42 0.00 0.0011054.62 Start 4°/100' DLS, -15.73° TF, for 134.25
414517.25 91.15 151.43 7623.64 -10583.39 3756.07 4.00 -15.7311188.54 Hold for 56.84'
514574.09 91.15 151.43 7622.50 -10633.29 3783.25 0.00 0.0011245.22 CD5-2611 Tgt 01 Start 1'/100' DLS, 165.39° TF, for 190.67'
614764.76 89.30 151.91 7621.75 -10801.12 3873.72 1.00 165.3911435.45 Hold for 15049.81'
729814.56 89.30 151.91 7804.50 -24077.40 10959.17 0.00 0.0026454.20 CD5-2611 Tgt 02 TD: 29614.56' MD, 7804.5' TVD
I
I
I By signing this I acknowledge that I have been informed of all risks, checked that the data is correct, ensured it's completeness, and all
I surrounding wells are assigned to the proper position, and I approve the scan and collision avoidance plan as set out in the audit packl
y approve it as the basis for the final well plan and wellsite drawings. I also acknowledge that unless notified otherwise all targets have a
1 100 feet lateral tolerance.
repared by
Checked by
ccepted by
Approved by:
S. DeLapp
V. Osara
J. Ryan
CoP DE
O
CL
r
J
C�
N
I
a
W
0�
c� --
� q
x
N
LOdM L�9Z-5C1
518fi
C 0006eCb
i
0008?
_ N OOOL
00098
OOOS
OOot F
000c
000
--T
0 0 0 0
00 0
LO Ln o
co
yidaa IBai}aaA anal
0
0
p
�o
0
m
N
C) o
p CO
u Lq
LO
T
0
p U
N
dp U)
T 5
U
i
0
0
LO
0
T
0
O
Ap
1 `
0
0
LO
co
p
0
0
CD
T
0 J
O O O O O O
O O O O O O
y}da�EaiIaalA anarn
a rn
O
O
O
LO
T
O
O
,I4
T
C)
MCS
l'MW
J
T
C)
O
N
C'7
T
O
C'7
LO
L6
LO
O T
O a
N
T U
U
N
Cf)
O U
O +
O
CV
T
C)
C)
V
T
T
O
O
00
O
T
C)
C)
N
O
T
Qj
O
C)
0
LON
Q1
O
■
y=
p
O� ��?
o
O
C
N
CIO
C)
_
O
LO
T
A,
0
O
p Op O�
x
N
r
+
+�+
p OO p0
O
OOO Opp O�
O T
x
in
ctS
LLJ
O
O
O Op
p'
O r�
N
T
O
O o opp� f
O0 N cLO
<
__
�
o
Opoo
0 6,� !f
$oo���
CD
�
C^
co
CLN
C
TCD
O
TOM
x
O
J
Cfl
a
N
°
CD
O
Q
o
CD
OO
0
0
O
0
O O
o O
C)
L9
O
o
O
U')
O O
o m
T (+)yiaON/(-)qI noS
N N
ConocoPhillips Alaska Inc WNS
Western North Slope
C135 Alpine West Pad
Plan: CD5-26 (11C) - Slot 26
50103xxxxx00
CD5-261-1
Plan: C135-261-1 wp07
Standard Proposal Report
25 July, 2019
ConocoPhilli s
p
Conocoph it I i ps
Database: EDT 14 Alaska Production
Company: ConocoPhillips Alaska Inc_WNS
Project: Western North Slope
Site: CD5 Alpine West Pad
Well: Plan: CD5-26 (11 C)
Wellbore: CD5-261_1
Design: CD5-261_1 wp07
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-26 (11 C) -Slot 26
Plan D25 @ 74.50usft (D25)
Plan D25 @ 74.50usft (D25)
True
Minimum Curvature
Project Western North Slope, North Slope Alaska, United States
Map System: System Datum: Mean Sea Level
Geo Datum: Using Well Reference Point
Map Zone: Using geodetic scale factor
Site CD5 Alpine West Pad
Site Position:
From: Map
Position Uncertainty: 0.00 usft
Well Plan CD5-26 (11 C) -Slot 26
Well Position +N/ -S -4.65 usft
+E/ -W -160.86 usft
Position Uncertainty 0.00 usft Ground Level: 33.70 usft
Wellbore CD5-26L1
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(nT)
BGGM2018 11/1/2019 15.89 80.71 57,361
Design CD5-26L1 wp07
Audit Notes:
Version:
Phase:
PLAN Tie On Depth:
Vertical Section:
Depth From (TVD)
+N/ -S +E/.W
(usft)
(usft) (usft)
40.80
0.00 0.00
Plan Survey Tool Program
Date 7/25/2019
Depth From
Depth To
(usft)
(usft)
Survey (Wellbore)
Tool Name Remarks
1 14,350.00
14,750.00
CD5-261_1 wp07 (CD5-261-1)
MWD-INC—ONLY (INC>10°)
MWD-INC—ONLY—FILLER (IN,
2 14,750.00
16,250.00
CD5-26L1 wp07 (CD5-26L1)
MWD OWSG
OWSG MWD - Standard
3 14,750.00
29,814.46
CD5-26L1 wp07 (CD5-26L1)
MWD+IFR2+SAG+MS
OWSG MWD + IFR2 + Sag + A
14,350.00
Direction
155.53
725/2019 12:07 33PM Page 2 COMPASS 5000.14 Build 85H
ConocoPhillips
philli
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaska Inc_WNS
Project:
Western North Slope
Site:
CD5 Alpine West Pad
Well:
Plan: CD5-26 (11C)
Wellbore:
CD5-261-1
Design:
CD5-261-1 wp07
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-26 (11 C) - Slot 26
Plan D25 @ 74.50usft (D25)
Plan D25 @ 74.50usft (D25)
True
Minimum Curvature
Plan Sections
I
Measured
Vertical
Dogleg
Build
Tum
Depth
Inclination
Azimuth
Depth
+NIS
+E/ -W
Rate
Rate
Rate
TFO
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(°/100usft)
(°1100usft)
(°1100usft)
(°) Target
14,350.00
84.09
152.00
7,617.75
-10,435.52
3,678.33
0.00
0.00
0.00
0.00
14,363.00
85.98
152.89
7,618.88
-10,447.00
3,684.32
16.00
14.51
6.78
25.00
14,383.00
85.98
152.89
7,620.28
-10,464.76
3,693.42
0.00
0.00
0.00
0.00
14,517.25
91.15
151.43
7,623.64
-10;583.39
3,756.07
4.00
3.85
-1.08
-15.73
14,574.09
91.15
151.43
7,622.50
-10;633.29
3,783.25
0.00
0.00
0.00
0.00 CD5-2611T9t 01
14,764.76
89.30
151.91
7,621.75
-10,801.12
3,873.72
1.00
-0.97
0.25
165.39
29,814.56
89.30
151.91
7,804.50
-24,077.40
10,959.17
0.00
0.00
0.00
0.00 CD5-261-1 Tgt 02
7/25/2019 12:07*33PM Page 3 COMPASS 5000. 14 Build 85H
ConocoPhillips
Database:
EDT 14 Alaska Production
local Co-ordinate Reference
Company:
ConocoPhillips Alaska Inc WNS
TVD Reference:
Project:
Western North Slope
MD Reference:
Site:
CD5 Alpine West Pad
North Reference:
Well:
Plan: CD5-26 (11 C)
Survey Calculation Method:
Wellbore:
CD5-261-1
Dogleg
Design:
CD5-261-1 wp07
Depth Inclination
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-26 (11 C) - Slot 26
Plan D25 @ 74.50usft (D25)
Plan D25 @ 74.50usft (D25)
True
Minimum Curvature
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Turn
Depth Inclination
Azimuth
Depth
+NIS
+E/ -W
Section
Rate
Rate
Rate
(usft) (°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°/100usft)
(°/100usft)
14,350.00
84.09
152.00
7,617.75
-10,435.52
3,678.33
11,021.76
0.00
0.00
0.00
KOP: 16°/100' DLS,
25° TF, for 13'
14,351.00
84.24
152.07
7,617.85
-10,436.40
3,678.80
11,022.75
16.00
14.50
6.80
7-618 x 8-7/8
14,363.00
85.98
152.89
7,618.88
-10,447.00
3,684.32
11,034.69
16.00
14.51
6.78
Hold for 20'
14,383.00
85.98
152.89
7,620.28
-10,464.76
3,693.42
11,054.62
0.00
0.00
0.00
Start 4°/100' DLS, -15.73° TF,
for 134.25'
14,400.00
86.63
152.70
7,621.37
-10,479.85
3,701.17
11,071.56
4.00
3.85
-1.09
14,500.00
90.49
151.62
7,623.89
-10,568.23
3,747.85
11,171.34
4.00
3.85
-1.08
14,517.25
91.15
151.43
7,623.64
-10,583.39
3,756.07
11,188.54
4.00
3.85
-1.08
Hold for 56.84'
14,574.09
91.15
151.43
7,622.50
-10,633.29
3,783.25
11,245.22
0.00
0.00
0.00
Start 1°/100' DLS, 165.39°
TF,
for 190.67'
14,600.00
90.90
151.50
7,622.04
-10,656.06
3,795.63
11,271.07
1.00
-0.97
0.25
14,700.00
89.93
151.75
7,621.31
-10,744.04
3,843.15
11,370.83
1.00
-0.97
0.25
14,764.76
89.30
151.91
7,621.75
-10,801.12
3,873.72
11,435.45
1.00
-0.97
0.25
Hold for 15049.81'
14,800.00
89.30
151.91
7,622.17
-10,832.21
3,890.32
11,470.62
0.00
0.00
0.00
14,900.00
89.30
151.91
7,623.39
-10,920.43
3,937.40
11,570.42
0.00
0.00
0.00
15,000.00
89.30
151.91
7,624.60
-11,008.64
3,984.48
11,670.21
0.00
0.00
0.00
15,100.00
89.30
151.91
7,625.82
-11,096.86
4,031.56
11,770.00
0.00
0.00
0.00
15,200.00
89.30
151.91
7,627.03
-11,185.07
4,078.64
11,869.80
0.00
0.00
0.00
15,300.00
89.30
151.91
7,628.25
-11,273.29
4,125.72
11,969.59
0.00
0.00
0.00
15,400.00
89.30
151.91
7,629.46
-11,361.50
4,172.80
12,069.38
0.00
0.00
0.00
15,500.00
89.30
151.91
7,630.67
-11,449.72
4,219.88
12,169.18
0.00
0.00
0.00
15,600.00
89.30
151.91
7,631.89
-11,537.94
4,266.96
12,268.97
0.00
0.00
0.00
15,700.00
89.30
151.91
7,633.10
-11,626.15
4,314.04
12,368.77
0.00
0.00
0.00
15,800.00
89.30
151.91
7,634.32
-11,714.37
4,361.12
12,468.56
0.00
0.00
0.00
15,900.00
89.30
151.91
7,635.53
-11,802.58
4,408.20
12,568.35
0.00
0.00
0.00
16,000.00
89.30
151.91
7,636.75
-11,890.80
4,455.28
12,668.15
0.00
0.00
0.00
16,100.00
89.30
151.91
7,637.96
-11,979.01
4,502.36
12,767.94
0.00
0.00
0.00
16,200.00
89.30
151.91
7,639.17
-12,067.23
4,549.44
12,867.73
0.00
0.00
0.00
16,300.00
89.30
151.91
7,640.39
-12,155.45
4,596.52
12,967.53
0.00
0.00
0.00
16,400.00
89.30
151.91
7,641.60
-12,243.66
4,643.60
13,067.32
0.00
0.00
0.00
16,500.00
89.30
151.91
7,642.82
-12,331.88
4,690.68
13,167.11
0.00
0.00
0.00
16,600.00
89.30
151.91
7,644.03
-12,420.09
4,737.76
13,266.91
0.00
0.00
0.00
16,700.00
89.30
151.91
7,645.25
-12,508.31
4,784.84
13,366.70
0.00
0.00
0.00
16,800.00
89.30
151.91
7,646.46
-12,596.52
4,831.92
13,466.50
0.00
0.00
0.00
16,900.00
89.30
151.91
7,647.67
-12,684.74
4,879.00
13,566.29
0.00
0.00
0.00
17,000.00
89.30
151.91
7,648.89
-12,772.95
4,926.08
13,666.08
0.00
0.00
0.00
17,100.00
89.30
151.91
7,650.10
-12,861.17
4,973.16
13,765.88
0.00
0.00
0.00
17,200.00
89.30
151.91
7,651.32
-12,949.39
5,020.24
13,865.67
0.00
0.00
0.00
17,300.00
89.30
151.91
7,652.53
-13,037.60
5,067.32
13,965.46
0.00
0.00
0.00
17,400.00
89.30
151.91
7,653.75
-13,125.82
5,114.40
14,065.26
0.00
0.00
0.00
17,500.00
89.30
151.91
7,654.96
-13,214.03
5,161.48
14,165.05
0.00
0.00
0.00
17,600.00
89.30
151.91
7,656.17
-13,302.25
5,208.56
14,264.84
0.00
0.00
0.00
17,700.00
89.30
151.91
7,657.39
-13,390.46
5,255.64
14,364.64
0.00
0.00
0.00
17,800.00
89.30
151.91
7,658.60
-13,478.68
5,302.72
14,464.43
0.00
0.00
0.00
17,900.00
89.30
151.91
7,659.82
-13,566.90
5,349.80
14,564.23
0.00
0.00
0.00
18,000.00
89.30
151.91
7,661.03
-13,655.11
5,396.88
14,664.02
0.00
0.00
0.00
18,100.00
89.30
151.91
7,662.25
-13,743.33
5,443.96
14,763.81
0.00
0.00
0.00
18,200.00
89.30
151.91
7,663.46
-13,831.54
5,491.04
14,863.61
0.00
0.00
0.00
7/25/2019 12:0733PM Page 4 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips
Standard Proposal Report
Database:
EDT 14 Alaska Production
Local Co-ordinate Reference:
Well Plan: CD5-26 (11 C) - Slot 26
Company:
ConocoPhillips Alaska Inc_WNS
TVD Reference:
Plan D25 @
74.50usft (D25)
Project:
Western North Slope
MD Reference:
Plan 025 @
74.50usft (D25)
Site:
CD5 Alpine West Pad
North Reference:
True
Well:
Plan: CD5-26 (11 C)
Survey Calculation Method:
Minimum Curvature
Wellbore:
CD5-26L1
Design:
CD5-261-1 wp07
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Turn
Depth
Inclination
Azimuth
Depth
+N/ -S
+El -W
Section
Rate
Rate
Rate
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°1100usft)
(°/100usft)
18,300.00
89.30
151.91
7,664.68
-13,919.76
5,538.12
14,963.40
0.00
0.00
0.00
18,400.00
89.30
151.91
7,665.89
-14,007.97
5,585.20
15,063.19
0.00
0.00
0.00
18,500.00
89.30
151.91
7,667.10
-14,096.19
5,632.28
15,162.99
0.00
0.00
0.00
18,600.00
89.30
151.91
7,668.32
-14,184.41
5,679.36
15,262.78
0.00
0.00
0.00
18,700.00
89.30
151.91
7,669.53
-14,272.62
5,726.44
15,362.57
0.00
0.00
0.00
18,800.00
89.30
151.91
7,670.75
-14,360.84
5,773.52
15,462.37
0.00
0.00
0.00
18,900.00
89.30
151.91
7,671.96
-14,449.05
5,820.60
15,562.16
0.00
0.00
0.00
19,000.00
89.30
151.91
7,673.18
-14,537.27
5,867.68
15,661.96
0.00
0.00
0.00
19,100.00
89.30
151.91
7,674.39
-14,625.48
5,914.76
15,761.75
0.00
0.00
0.00
19,200.00
89.30
151.91
7,675.60
-14,713.70
5,961.84
15,861.54
0.00
0.00
0.00
19,300.00
89.30
151.91
7,676.82
-14,801.91
6,008.92
15,961.34
0.00
0.00
0.00
19,400.00
89.30
151.91
7,678.03
-14,890.13
6,056.00
16,061.13
0.00
0.00
0.00
19,500.00
89.30
151.91
7,679.25
-14,978.35
6,103.08
16,160.92
0.00
0.00
0.00
19,600.00
89.30
151.91
7,680.46
-15,066.56
6,150.16
16,260.72
0.00
0.00
0.00
19,700.00
89.30
151.91
7,681.68
-15,154.78
6,197.24
16,360.51
0.00
0.00
0.00
19,800.00
89.30
151.91
7,682.89
-15,242.99
6,244.32
16,460.30
0.00
0.00
0.00
19,900.00
89.30
151.91
7,684.10
-15,331.21
6,291.40
16,560.10
0.00
0.00
0.00
20,000.00
89.30
151.91
7,685.32
-15,419.42
6,338.48
16,659.89
0.00
0.00
0.00
20,100.00
89.30
151.91
7,686.53
-15,507.64
6,385.56
16,759.69
0.00
0.00
0.00
20,200.00
89.30
151.91
7,687.75
-15,595.86
6,432.64
16,859.48
0.00
0.00
0.00
20,300.00
89.30
151.91
7,688.96
-15,684.07
6,479.72
16,959.27
0.00
0.00
0.00
20,400.00
89.30
151.91
7,690.18
-15,772.29
6,526.80
17,059.07
0.00
0.00
0.00
20,500.00
89.30
151.91
7,691.39
-15,860.50
6,573.88
17,158.86
0.00
0.00
0.00
20,600.00
89.30
151.91
7,692.60
-15,948.72
6,620.96
17,258.65
0.00
0.00
0.00
20,700.00
89.30
151.91
7,693.82
-16,036.93
6,668.04
17,358.45
0.00
0.00
0.00
20,800.00
89.30
151.91
7,695.03
-16,125.15
6,715.12
17,458.24
0.00
0.00
0.00
20,900.00
89.30
151.91
7,696.25
-16,213.36
6,762.20
17,558.03
0.00
0.00
0.00
21,000.00
89.30
151.91
7,697.46
-16,301.58
6,809.28
17,657.83
0.00
0.00
0.00
21,100.00
89.30
151.91
7,698.68
-16,389.80
6,856.36
17,757.62
0.00
0.00
0.00
21,200.00
89.30
151.91
7,699.89
-16,478.01
6,903.44
17,857.42
0.00
0.00
0.00
21,300.00
89.30
151.91
7,701.11
-16,566.23
6,950.52
17,957.21
0.00
0.00
0.00
21,400.00
89.30
151.91
7,702.32
-16,654.44
6,997.60
18,057.00
0.00
0.00
0.00
21,500.00
89.30
151.91
7,703.53
-16,742.66
7,044.68
18,156.80
0.00
0.00
0.00
21,600.00
89.30
151.91
7,704.75
-16,830.87
7,091.76
18,256.59
0.00
0.00
0.00
21,700.00
89.30
151.91
7,705.96
-16,919.09
7,138.84
18,356.38
0.00
0.00
0.00
21,800.00
89.30
151.91
7,707.18
-17,007.31
7,185.92
18,456.18
0.00
0.00
0.00
21,900.00
89.30
151.91
7,708.39
-17,095.52
7,233.00
18,555.97
0.00
0.00
0.00
22,000.00
89.30
151.91
7,709.61
-17,183.74
7,280.08
18,655.77
0.00
0.00
0.00
22,100.00
89.30
151.91
7,710.82
-17,271.95
7,327.16
18,755,56
0.00
0.00
0.00
22,200.00
89.30
151.91
7,712.03
-17,360.17
7,374.24
18,855.35
0.00
0.00
0.00
22,300.00
89.30
151.91
7,713.25
-17,448.38
7,421.32
16,955.15
0.00
0.00
0.00
22,400.00
89.30
151.91
7,714.46
-17,536.60
7,468.40
19,054.94
0.00
0.00
0.00
22,500.00
89.30
151,91
7,715.68
-17,624.82
7,515.48
19,154.73
0.00
0.00
0.00
22,600.00
89.30
151.91
7,716.89
-17,713.03
7,562.56
19,254.53
0.00
0.00
0.00
22,700.00
89.30
151.91
7,718.11
-17,801.25
7,609.64
19,354.32
0.00
0.00
0.00
22,800.00
89.30
151.91
7,719.32
-17,889.46
7,656.72
19,454.11
0.00
0.00
0.00
22,900.00
89.30
151.91
7,720.53
-17,977.68
7,703.80
19,553.91
0.00
0.00
0.00
23,000.00
89.30
151.91
7,721.75
-18,065.89
7,750.88
19,653.70
0.00
0.00
0.00
23,100.00
89.30
151.91
7,722.96
-18,154.11
7,797.96
19,753.50
0.00
0.00
0.00
23,200.00
89.30
151.91
7,724.18
-18,242.32
7,845.04
19,853.29
0.00
0.00
0.00
23,300.00
89.30
151.91
7,725.39
-18,330.54
7,892.12
19,953.08
0.00
0.00
0.00
23,400.00
89.30
151.91
7,726.61
-18,418.76
7,939.20
20,052.88
0.00
0.00
0.00
23,500.00
89.30
151.91
7,727.82
-18,506.97
7,986.28
20,152.67
0.00
0.00
0.00
23,600.00
89.30
151.91
7,729.03
-18,595.19
8,033.36
20,252.46
0.00
0.00
0.00
7/25/2019 12:07.,33PM Page 5 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Standard Proposal Report
Database:
EDT 14 Alaska Production
Local Co-ordinate Reference:
Well Plan: CD5-26 (11 C) - Slot 26
Company:
ConocoPhillips Alaska Inc_WNS
TVD Reference:
Plan D25 @
74.50usft (D25)
Project:
Western North Slope
MD Reference:
Plan 025 @
74.50usft (D25)
Site:
CD5 Alpine West Pad
North Reference:
True
Well:
Plan: CD5-26 (11 C)
Survey Calculation Method:
Minimum Curvature
Wellbore:
CD5-261-1
Design:
CD5-261-1 wp07
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Turn
Depth
Inclination
Azimuth
Depth
+N/ -S
+E/ -W
Section
Rate
Rate
Rate
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°I100usft)
(°/100usft)
(°/100usft)
23,700.00
89.30
151.91
7,730.25
-18,683.40
8,080.44
20,352.26
0.00
0.00
0.00
23,800.00
89.30
151.91
7,731.46
-18,771.62
8,127.52
20,452.05
0.00
0.00
0.00
23,900.00
89.30
151.91
7,732.68
-18,859.83
8,174.60
20,551.84
0.00
0.00
0.00
24,000.00
89.30
151.91
7,733.89
-18,948.05
8,221.68
20,651.64
0.00
0.00
0.00
24,100.00
89.30
151.91
7,735.11
-19,036.27
8,268.76
20,751.43
0.00
0.00
0.00
24,200.00
89.30
151.91
7,736.32
-19,124.48
8,315.84
20,851.23
0.00
0.00
0.00
24,300.00
89.30
151.91
7,737.54
-19,212.70
8,362.92
20,951.02
0.00
0.00
0.00
24,400.00
89.30
151.91
7,738.75
-19,300.91
8,410.00
21,050.81
0.00
0.00
0.00
24,500.00
89.30
151.91
7,739.96
-19,389.13
8,457.08
21,150.61
0.00
0.00
0.00
24,600.00
89.30
151.91
7,741.18
-19,477.34
8,504.16
21,250.40
0.00
0.00
0.00
24,700.00
89.30
151.91
7,742.39
-19,565.56
8,551.24
21,350.19
0.00
0.00
0.00
24,800.00
89.30
151.91
7,743.61
-19,653.77
8,598.32
21,449.99
0.00
0.00
0.00
24,900.00
89.30
151.91
7,744.82
-19,741.99
8,645.40
21,549.78
0.00
0.00
0.00
25,000.00
89.30
151.91
7,746.04
-19,830.21
8,692.48
21,649.57
0.00
0.00
0.00
25,100.00
89.30
151.91
7,747.25
-19,918.42
8,739.56
21,749.37
0.00
0.00
0.00
25,200.00
89.30
151.91
7,748.46
-20,006.64
8,786.64
21,849.16
0.00
0.00
0.00
25,300.00
89.30
151.91
7,749.68
-20,094.85
8,833.72
21,948.96
0.00
0.00
0.00
25,400.00
89.30
151.91
7,750.89
-20,183.07
8,880.80
22,048.75
0.00
0.00
0.00
25,500.00
89.30
151.91
7,752.11
-20,271.28
8,927.88
22,148.54
0.00
0.00
0.00
25,600.00
89.30
151.91
7,753.32
-20,359.50
8,974.96
22,248.34
0.00
0.00
0.00
25,700.00
89.30
151.91
7,754.54
-20,447.72
9,022.04
22,348.13
0.00
0.00
0.00
25,800.00
89.30
151.91
7,755.75
-20,535.93
9,069.12
22,447.92
0.00
0.00
0.00
25,900.00
89.30
151.91
7,756.96
-20,624.15
9,116.20
22,547.72
0.00
0.00
0.00
26,000.00
89.30
151.91
7,758.18
-20,712.36
9,163.28
22,647.51
0.00
0.00
0.00
26,100.00
89.30
151.91
7,759.39
-20,800.58
9,210.36
22,747.30
0.00
0.00
0.00
26,200.00
89.30
151.91
7,760.61
-20,888.79
9,257.44
22,847.10
0.00
0.00
0.00
26,300.00
89.30
151.91
7,761.82
-20,977.01
9,304.52
22,946.89
0.00
0.00
0.00
26,400.00
89.30
151.91
7,763.04
-21,065.22
9,351.60
23,046.69
0.00
0.00
0.00
26,500.00
89.30
151.91
7,764.25
-21,153.44
9,398.68
23,146.48
0.00
0.00
0.00
26,600.00
89.30
151.91
7,765.46
-21,241.66
9,445.76
23,246.27
0.00
0.00
0.00
26,700.00
89.30
151.91
7,766.68
-21,329.87
9,492.84
23,346.07
0.00
0.00
0.00
26,800.00
89.30
151.91
7,767.89
-21,418.09
9,539.92
23,445.86
0.00
0.00
0.00
26,900.00
89.30
151.91
7,769.11
-21,506.30
9,587.00
23,545.65
0.00
0.00
0.00
27,000.00
89.30
151.91
7,770.32
-21,594.52
9,634.08
23,645.45
0.00
0.00
0.00
27,100.00
89.30
151.91
7,771.54
-21,682.73
9,681.16
23,745.24
0.00
0.00
0.00
27,200.00
89.30
151.91
7,772.75
-21,770.95
9,728.24
23,845.03
0.00
0.00
0.00
27,300.00
89.30
151.91
7,773.97
-21,859.17
9,775.32
23,944.83
0.00
0.00
0.00
27,400.00
89.30
151.91
7,775.18
-21,947.38
9,822.40
24,044.62
0.00
0.00
0.00
27,500.00
89.30
151.91
7,776.39
-22,035.60
9,869.48
24,144.42
0.00
0.00
0.00
27,600.00
89.30
151.91
7,777.61
-22,123.81
9,916.56
24,244.21
0.00
0.00
0.00
27,700.00
89.30
151.91
7,778.82
-22,212.03
9,963.64
24,344.00
0.00
0.00
0.00
27,800.00
89.30
151.91
7,780.04
-22,300.24
10,010.72
24,443.80
0.00
0.00
0.00
27,900.00
89.30
151.91
7,781.25
-22,388.46
10,057.80
24,543.59
0.00
0.00
0.00
28,000.00
89.30
151.91
7,782.47
-22,476.68
10,104.88
24,643.38
0.00
0.00
0.00
28,100.00
89.30
151.91
7,783.68
-22,564.89
10,151.96
24,743.18
0.00
0.00
0.00
28,200.00
89.30
151.91
7,784.89
-22,653.11
10,199.04
24,842.97
0.00
0.00
0.00
28,300.00
89.30
151.91
7,786.11
-22,741.32
10,246.12
24,942.77
0.00
0.00
0.00
28,400.00
89.30
151.91
7,787.32
-22,829.54
10,293.20
25,042.56
0.00
0.00
0.00
28,500.00
89.30
151.91
7,788.54
-22,917.75
10,340.28
25,142.35
0.00
0.00
0.00
28,600.00
89.30
151.91
7,789.75
-23,005.97
10,387.36
25,242.15
0.00
0.00
0.00
28,700.00
89.30
151.91
7,790.97
-23,094.18
10,434.44
25,341.94
0.00
0.00
0.00
28,800.00
89.30
151.91
7,792.18
-23,182.40
10,481.52
25,441.73
0.00
0.00
0.00
28,900.00
89.30
151.91
7,793.39
-23,270.62
10,528.60
25,541.53
0.00
0.00
0.00
29,000.00
89.30
151.91
7,794.61
-23,358.83
10,575.68
25,641.32
0.00
0.00
0.00
7/25/2019 12:0733PM Page 6 COMPASS 5000.14 Build 85H
ConocoPsphilli
ConocoPhillips
Standard Proposal Report
Database: EDT 14 Alaska Production
Local Coordinate Reference:
Well Plan: CD5-26 (11C) - Slot 26
Company: ConocoPhillips Alaska Inc_WNS
TVD Reference:
Plan D25 @ 74.50usft (D25)
Project: Western North Slope
MD Reference:
Plan D25 @ 74.50usft (D25)
Site: CD5 Alpine West Pad
North Reference:
True
Well: Plan: CD5-26 (11 C)
Survey Calculation Method:
Minimum Curvature
Wellbore: CD5-261_1
Design: CD5-26L1 wp07
Planned Survey
Measured
Vertical
Vertical
Dogleg Build
Tum
Depth Inclination Azimuth
Depth
+N/ -S
+E/ -W Section
Rate Rate
Rate
(usft) (°) (°)
(usft)
(usft)
(usft) (usft)
(°/100usft) (°/100usft) (°/100usft)
29,100.00 89.30 151.91
7,795.82
-23,447.05
10,622.76 25,741.11
0.00 0.00
0.00
29,200.00 89.30 151.91
7,797.04
-23,535.26
10,669.84 25,840.91
0.00 0.00
0.00
29,300.00 89.30 151.91
7,798.25
-23,623.48
10,716.92 25,940.70
0.00 0.00
0.00
29,400.00 89.30 151.91
7,799.47
-23,711.69
10,764.00 26,040.50
0.00 0.00
0.00
29,500.00 89.30 151.91
7,800.68
-23,799.91
10,811.08 26,140.29
0.00 0.00
0.00
29,600.00 89.30 151.91
7,801.89
-23,888.13
10,858.16 26,240.08
0.00 0.00
0.00
29,700.00 89.30 151.91
7,803.11
-23,976.34
10,905.24 26,339.88
0.00 0.00
0.00
29,800.00 89.30 151.91
7,804.32
-24,064.56
10,952.32 26,439.67
0.00 0.00
0.00
29,814.56 89.30 151.91
7,804.50
-24,077.40
10,959.17 26,454.20
0.00 0.00
0.00
TD: 29814.56' MD, 7804.5' TVD - 4-1/2 x 63/4
[Design Targets
Target Name
hit/miss target Dip Angle Dip Dir.
TVD +WS
+E/ -W
Shape (°) (°)
(usft) (usft)
(usft)
CD5-261_1 Tgt 01 0.00 0.00
7,622.50 -10,633.29
3,783.25
- plan hits target center
-Circle (radius 100.00)
CD5-261_1 Tgt 02 0.00 0.00
7,804.50 -24,077.40
10,959.17
- plan hits target center
-Circle (radius 100.00)
Casing Points
Measured Vertical
Casing Hole
Depth Depth
Diameter Diameter
(usft) (usft)
Name
(in) (in)
2,335.52 2,264.00
10-3/4 x 13-1/2
10.750 13.500
14,351.00 7,617.84
7-5/8 x 9-7/8
7.625 9.875
29,814.56 7,804.50
4-1/2 x 6-3/4
4.500 6.750
Plan Annotations
Measured Vertical
Local Coordinates
Depth Depth
+WS
+E/.W
(usft) (usft)
(usft)
(usft)
Comment
14,350.00 7,617.75
-10,435.52
3,678.33
KOP: 16°/100' DLS, 25° TF, for 13'
14,363.00 7,618.88
-10,447.00
3,684.32
Hold for 20'
14,383.00 7,620.28
-10,464.76
3,693.42
Start 4°/100' DLS, -15.73°
TF, for 134.25'
14,517.25 7,623.64
-10,583.39
3,756.07
Hold for 56.84'
14,574.09 7,622.50
-10,633.29
3,783.25
Start 1°/100' DLS, 165.39° TF, for 190.67'
14,764.76 7,621.75
-10,801.12
3,873.72
Hold for 15049.81'
29,814.56 7,804.50
-24,077.40
10,959.17
TD: 29814.56' MD, 7804.5'
TVD
7252019 12:07 33PM Page 7 COMPASS 5000.14 Build 85H
0
N
m
0
Z
o
0
c
C
wC
N
+
v
O
ma
y
� U
m
m
m
a
m
w
A
Y �
m U
m r
E
_
Q
LO
E
c
^
^
C m
�
R V
n v
m a
m
o
�
A
S
p
W
•N
^
A
ii
ilk
v
h
A
ii
�%
E a
•x
N u�i
� m
O
t
o
O
.�
a
L V
E a n
0
V
D�
NCL
x
E o
O
z
cLb
x
O
L
o
Z�
t"! N
m
^
E'�-�
U
o�
,V
N
m
o
i..
Q
N
L j
N
�i
>+
m
m c v u
p
N
Lo
C
LCA
�
in
p
_
'
v Cc
`o
V
if
S
V
V
Q
E°
c°�
N
� C'
D M m C7
0
N
a
O
U
a
z
o
3
OI
o -r o
z
E
E
3
N
C
�
a
N N N N N
N N N N N N N
N N N N N
N N N N N
N N N N
N N N N N
(0 (0 (0
N N N N N N N
N N N N l9 (0 N
N N N N N
(0 (0 (6 t0 (0
N N N N N
(0 (6 (0 (0 (0
N N N N
f0 f0 l0 f6
a
L IL
LL n. LL a
LL a LL LL a a LL
LL CL CL a a
a s a LL a
a a s o_
0
v
O
0
U
m E
U U
m m O O
U 0
ED E
C N C N N
N C N C m
M M
C N G m
f6
N
f0 C f0 l0
O
G C
_
C
2 LL B LL LL
LL A LL f6 LL
� LL N U-
LL r0 LL LL
��„ lLL LLL
i
N N N O m
p U 0 U U
m N m m N m m
U 0 U 0 U
y N m m
0 0 0 U
m N N N N
U 0 U U
Mn m m
0 0 0 0
E
E
C C C
rn <n
C C C
<n
C C
(n
C C G
C C
E
°@° T T
L° ° a L° m N L°
° 1° ° H L°
T m ti L° T
E 10 T
O
C @ c N m
c CL 0 C d M
c w c a m
N c O. N m
c c m N
(n
m a� m
m m
m m m m
m m_ m m
m m m m
U U U U U
U U W U U W U
U U U W U
U U W U U
U U U U
(o (o wo
wo N O wo N O Co
O No V mo
O M (o mD to
� M M
m
V
(A r in r fo
(o (o O
(o M O O M O O
O OD OD r` O [D n
I� O (o (o (o
V M O O m
r O r` O
r` r CM M N
N w M
O M O CD
CJ w 6 m
r` V e- M
m ..
� O
m m
m LL
U
0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 (ci o (ri
0 0 0 0 0
o cd (ri (ri n
0 0 0 0 0
ui o 0 o ui
0 0 0 0
� 0 0 0
O L
0 0 0 0
(o O (o O M
N N 1� N N
M 10 00 O (o -c O
N N r
r N (o r- O
M u7 O (O 1�
CO M h r` O
O M O
M m r N
m❑�
.- N r N N
N r r r r r r
N M r r N
N r r r r
M M
O a O a N
N M� n (n a
O M m
a M M
m (O M
C
N N N
N M 7 M
N N O V I�
O M (l
O R I� (p
m 0
(C Om O
O N N N N N N
M
m
D. W
(o M (( o co a
7 (D (D (o (D (o (o
O T O
I� R 7
r` r
•- m`
W m
(V (V (V (V (V
cV (V (V (V (V N N
r r r
(V (V (V (V
N
N
I� O n O M
O n O a n O a
((') r` N m m
O O M N 7
'O
O OD O (n
OJ 0 w 0 to
(n M M M M M M
(O M w M M W M
M (� (o (O M
N O N N (o
O (O CD r (O
(o (o v O
M (p M N
M to a N
O L
(q G :C
O O
([1 r (f1 n N
(tD
L( (o O R (O O
N n � m (n � W
M O (o (A
M CO m� r
N u7 O O
(o O r r M
cc M
O
(o CD D
m m
T Oi C2 O N
�- N r N N
N (o (o (o (O (o (o
N r r r .- r
(� to u'i m
N(o N
O a O
N r r r r
r N N
❑ .�
CL
O
O (o O r (n O r
N u7 (D 7 (O
O O (O f� O
m O r M
r
o
E m
o of o 0 0
0 of ri ci ri
ci m o 0
o a ro o of
of n o w
JO
C
R D V o O
W n n r r
r r M 7 O
J O N M
rn
N r O
(o
E m
o 0 0 C C
M M M
C r r r r r r
M M M M M
2
r m rn w
v v 0
N
fr (p
0
C O
C7 C'i
M C7
N N N (V
r (V
U
Q
J
U
0
ry O.
r O ti O O
O n O V (o 't
n n N m m
O O M N 7
O o N
m
N
•O
(D O m O (n
N M M M M M M
M (l O M M
O (o m r u7
M (o M N
1
m❑
V
L L
'N d p
m (o w (o t0
(O M w m M m M
It �-D
� R
N O N N 0
M M M r
0 0 V O
r m.:
n (O V N
10 m
�►
C �
(O
Ll
O
(D ONi
m
U
m n
0❑ '••
O N O N N
N M O M M M O
N N M O ¢f
�� O O�
� A N N
N
r
L L'o X
co
p
N
U
Z v
«� E
i
❑ o
/��/�
'
0 0 0 0 0
IL
2 a m
E
3 3 3
L
o
'
m
Vp
a m m 0- a m
m m m
N N N N
O
Z
m
N
�O
C a
m
J J J J J J
M M M
0 0❑❑❑
C yl O
a
N N N N N N
�... �.. r
M M M
U U U U U
3 v C
v
x 0 0 0 0 0 0
uJ
0 0
0 0 N N m� O
�CLu
O
a) m
3
N
N
U U U U U U
N N N
M M
U U U
N N N N N 0
O
CL
C W
'
IQ
N N N N
to
N N
❑ ❑ ❑
U
CD
ECL"U
E
0--
-000'
mmmmmm
oo
mmm
❑ ❑
UUUUU
(�
N o m
U U U U
0- d. d a_ D_ LL
U U
CL
°i
O
a ❑
=
'
J
J J J J J J J
J J J
(O (O
M rai rai A (n
M M M M M
U U U U (O
N N M ❑
r
3
'
d
C)
N N N
•y
= 7
CO
C
❑ ❑ ❑ ❑ O
❑ ❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑
U U U U U
N N N N N 00
O
m
CL
UUUUU
UUUUUUU
L) C) U
CUU, C, C, rn
L C3 m N
E
Q
M M M
❑❑❑❑❑
U
0
C O)
= p•
N N N N N
N N N N N N N
N N N N N
M M M M M
U U U U U U
V
m
T G
K C
« E
O
([) (n ([)
❑ ❑ ❑ ❑ ❑
(C) (A ([J (n ([) (A
❑ ❑ ❑ ❑ ❑ ❑ ❑
6 A (t5 A
❑ ❑ ❑ ❑ ❑
6 A (n � 0
❑ ❑ ❑ ❑ ❑
C C C C C
m m m m m rn
�+
V
U
LL d d d d LL'
C C
amm
a
O
U
a
1�
u
0
y
0
> >
0 7 2 2 2 2
0 0 0 o m
0 0 0 o v
N M r N aD
N ;t r �2 N
0 0 0 0 0
m o 0 0 0
0 0 0 0 0
Q� Ncnnr
-�
LL N ;i ;E 14
U)
co
a
U
O
co
rn
E
0
CL
c
O
v
W E
m E
E
E
U)
U)
0
c o
m IL
U
9
A O.
�
m G
C
m C
m A r
CL m
m
w o.
m
fq
� n
m
O
r
3
0
r
o
E m
co
E m
N
o m
�
cwg
'o
LO
o`
y
Q
J
O
Yr
cmi m
co
L N
U
p
Y
0�♦
� � c c
V
T N m
CL
a m
m
i o
E
Z
w
c a m
c
L
m m N C
d
m m
O
U
S B
3
CP m
CL
0 0
,W
E G N U
m
U U
Li
x 8 v
m
rn rn
O N o
Z
=
r U o E
m
U U
U7
= a a
Arm,
0
rn rn
?
m °
d
to m m
c O1
E
Z a
U U
m
T C
am. p
Oi rn
C C
Qm
m
1LO- K fq iq
0
y
0
> >
0 7 2 2 2 2
0 0 0 o m
0 0 0 o v
N M r N aD
N ;t r �2 N
0 0 0 0 0
m o 0 0 0
0 0 0 0 0
Q� Ncnnr
-�
LL N ;i ;E 14
U)
co
a
U
O
co
a�
W
0
m
0
z
C
0
L
V
N
in
a
ym
m �
w
K N
O U
ti
' U
a O
■-
■-
�
R
0 lL
dR
^
C
�
on-Cj
A m
°
i
:E
CL
N
d
a
0'+
r
o
Ka
`�
wm�.n�
V
Oy
N
r'
0
m
Z
J
J
\+
O
L
o
o
z .�
nmo7ii�
o�„
d
Q
U
to
N
X
CO
CD
N
��
!+
m m
e
ci
L ' M a
m e vn W
O
Nl
Lo
C
Ln
CD
L(i
0
w�+
'
m
U
z z o
V
V
if
V
U
U
Q
E
' m m° L
L)
LLS
N
t= z
0 wvi c�
a a
N fA
0
CL
s
0
0
c
0
U
Y
Q
CL
3
T
J
N
Lh
0
U
V
T
T
N
0
U
a
L
Q
w.
AQA
W
N
C
Q
E
c
0
N N N N N N N N N N N N N N N N N N N N N N N N N N N N
N N N N N N N N N N N N N N N N N N N N N N N N N N N N
m m a m m to m m m to m m to m m m to m A m m to to w m to
a o_ a s s a s o_ o_ a n a LL a a o_ a n. a a a a a d a d a
c c° ° c c c c c c c
d° o mo da v� o v
w c m c m a m m
f0 N LL (0 t0 11 t6 f0 lL f6 N LL m N LL l0 f5 LL N N lL N (6 LL l6 f6 LL t6
N N U N N U N N N U N N y N y N y N y N
❑ U c❑ U c ❑ U c❑ U c ❑ U c❑ fA c ❑ N c❑ U c O N c❑
Uc W U c c d d d
moc a cn na dU —nd
U W U U W U U w U U W U
cv
W U U w U U w U U w U U
M M ,O O t0 4 r O N M f0 O N 0 r V tD O M (0 O M fA M
M M N C O O M O O N OI to O V a0 M� m r O O O O O 'O
0 O 'O W r V W 'O CO O V 0 R r r 0 r O 0 N W O W r 'Ow w
N M t0 It V a N N N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
vi 0 0 0 N N 0 O 0 0 0 0 0 o N O o o ,ri O o ui o C 0 0 of o
r O O u] r r '0 O ,0 O O u') r ,O r N h N ,O N ,O O ,O
W O '0 N d' M V '0 � 7 '0 � O '0. N O N N O O)(11 O O) co co
N
M 0 r V 0 N O t0 OO m
M M N M r to N CT N V M r 'O
M M r O O (O (O O (fJ (O O O M O O M M tD t0 W O N N N O N
M D1 V r r 'O r r V r r 'Q 10 N (D 10 to f0 f0 m O) (b (0 m — 'O
N N M N N M � � O � O � � O) � 0I � � O
M M N N N
M 01 N to O M O M O M M O m '0 O ro N t0 N M O N tD to
O r O N N O N N N N N O1 O) N O M t0 V N O
M M 6 M
0 't')
w o v o t0
t0 t0 r r N .- .- N
0 m r M 'O m v r c v r v r O a r O R y r y r h M Vt0 t0'O
W O fP y r N N N Cl! r M r W O r O O V O C (O
M M fif O W r m O N W W N W M r to m r tP W r W M r M M N (O
m rn v r r to r r r r r r 'n 'n m 'n 'o m rn rn o rn rn o
c6 M c6 M M
M tr N O) m M O M O M 'O t0 tD � t0 N t0 N t0 to N O W
O r (p N N W N N r N N r N W O N ma! r 'O t0 R N O
of N m a 0 r V a 'n a 'n N t0 m N 0 m M m o7 M m M m m 'A m
r O r 'O r- It 'O O '0 h O '0 N r 0 'O r O) M N M
01 O R N V M t0 O C 'O O N u M 'O O M M M— m O r t0 r O tp
j N
r G t LA
tom
c ❑ _
i t0 a u
a `o
d
i o �14, A
E
z
• a d "
d
d
J J J
J J J
J J J
J
tp d
N N N
r r r u7 'C) u;
t2 m m 'n 'n h
tP O W N 'f1
C
N N
❑ ❑ ❑❑
O '0 ) (%
❑ in
0'
❑ ❑ ❑
❑ ❑ ❑
O N 0
UG
❑❑ ❑
d
Z
N
❑ ❑ ❑
U U U U U U
U U , , , U
U U U ,
U U U ,
U U U
•
Q N
' ' ' ' ' '
' ' ' J J J
' ' ' J J J
' ' ' J J J
' ' ' J
U EN
N N N
r r r r r r
M O O c0 O N
O) O O— Of 01
N N N N
..
3
a)
L6
LA�L6�A6
L—�6 A�
L 66
60A
i oc
c
L6L6L66
❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑
• 'N o m
d y
•a
U U U U U U
U U U U U U
U U U U U U
U U U U U U
U U U U
d
N
:RN
70 d0 5
.
r r r N N
r r r r r r
W O M M O O
O) O O) O) O O)
N N N N
G
N
h
m
• d R A
M M
d E
'•' p
D
t!1 'q '()
❑ ❑ ❑ ❑ ❑ ❑
'[) '[] '!) '() '[) '[)
❑ ❑ ❑ ❑ ❑ ❑
tt) '(] tf) 'O '()
❑ O ❑ ❑ ❑ O
'n 'i) '() 'n '() '()
❑ ❑ ❑ ❑ ❑ ❑
'() 'n 'n
❑ ❑ ❑ ❑
c c
(n U
V
U U U U U U
U U U U U U
U U U U U U
U U U U U U
U U U U
d c0) v
x 0) 0)
CD
O
N
`1;
3
0
a
N
N N N N N N N N N N N N N N N y N N N N N N N N N N N N N N
N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
m m m m m m m m m m m m m m m m m m m m m m m m m m m m m m
a n. a a a a a a a a a a a a a a a d a a a a a a o_ a a a a 0-
0 O
a c c c c c c c c c c
4
o2
m E m C m C m C m C m C m C m C m C m C m C
2, •C a IL _m a W m a W Y6 a LL _m a LL CO CO LL Co Co LL _m a LL _m m W _m m LL m
NC CI N N N Cl N N N _N C) y N N N N N _1 w N w _N N _N , N
E U) G❑ C ❑ C❑ C ❑ C❑ C ❑ C❑ C ❑ C❑ C ❑
CI m N 0 N `1 N N N C) l0 `) N m N QI m `1 0 m N N m m N 1`6 `1 0 m `1
a@ c a m a m a m c n c n m c a c n (o c a m a (� c
N = N N N C) = Ol m= m C) e m N= N e m Cl N N C N al = W Ol
W U U W U U W U U W U U W U U W U U W U U W U U W U U W U U
(0 M
d _
V N N N T t0 M (O (0 M O t0 O (!1 t0 O (0 (0 O m (0 0 m (0 0 (0 r N r O
C r m N m N a0 V aD W V' a0 0; cD W V a0 N N a0 W (n
� O N �
d �-
4) A
LL
U
0 o a o 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0
a C o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O i0 O (0 O O (0 (0 O N i0 O 0 (0 0 (0 (0
,= O N N r r (0 r (O N (0 O r N O r N 0 r N r N r N N r N r
y Q r (0 r r m r r ct N 0 r G m r at c0 r M O r M (O r N (0 r N (O
y d N N N N N N N
� O
m O w(0 N V N O m N O (0 V O (0 N (0 N
C N M m W W M (0 Cl '• m m r m r m r N m r <V m r W O m M N
y 0 N
0 N N m (0 t0 (0 (O N N (0 N N (0 N N r N N r N N O M N m N
M10 M M O M M O r
6
Q V N N N N N
W N
N
N V r W W M 0 r N 0 V O O V O O V O 0 V O (0 V O M V O O O
a V (0 O (i m m N V N (0 N OR O W CO O r 4] (0 O ' (0 N
L O M QD W (O r (0 N (0 O r N m r N m r N r N r N M r N CO N
m r r ct w O r r 0 r r 0 r N 0 r N (0 r N 0 r N 0
m N N N N N (V
C a 2
CL
3
o M r v m C] Co m o O V m o (n M
G r (0 M V M O (D m (0 N V V N V V N V O N O V N V N V P-:
N
T- O E Cl V7 O r r O 6 w m O O r r M r r M r r m r r m r r r r N O
O C O m m 0 r r m (0 (0 (0 M M O M M C M M C M M C M M O] M M m r
r N c w of m m of of
0
�
� 3 a
Q � m
U ry d N V r 0 m M 0 r N 0 V 0 0 V 0 0 V O 0 V O (0 V O M V 0 0 O
N a V (q O M m m N V N (0 m m O M W O r .- (0 (O O U0 N
( N N d L co (0 m co V M m M w M N W w (0 m m co m m 0 co co m (0 (0 m 6 0 m V
O M M M iA r (0 N (0 O r N m r N m r Nr N r N Cl) r N M M
C U (C N �• O1 r (0 r r m r r O r r m O r r (0 r r N r N m r N m r N (0 r N 0
U N C N❑` m r m m N N N N
r y W N N N N
N �
� p U
Lo m E
D c
d G
)
m
R m m m m m 00
z
Q CO a Y 0 C) J J J J J J
U p V V V V V V
O N> N 3 N N N N N N N N ❑❑❑❑❑❑
�� N N N N N N N N N N N N N N N �� 6� U U U U U U N
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o U� U U oU o m m m m m m 0
xa (o a U U U UUUUUU UUUUUU a a a LL a LL
C a 0 P ? � v
O O N N N M MM V V V V V V V V V V V V V (0
Q L U 0 N N N N N .£ N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
a c o 7 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
•N Z 'y O y y U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U
-�O O U y E N O O 1 ( N N N M M M V V V V V V V V V V V V V V V V V V (0
O C m m Z C N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N
(n u� (n (n (n (n (n (n (n (b (n (n (n (n (n
.1r U v 0: K " O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ ❑
U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U U
CO
O
M
m
a
rA
O
z
o
�
o o c
a
c
CI
F F
0
i.. O
tq U)
U
z
WW
=
c
a a
o
U U)
a V�
3
v
o0
mm m m N
m m N N m
m m m N m m
m m m m N N
N N N m m m
m N m N N N
m m N m m
N m m m N
m N N N m N
m m m m m N
N m
m m
m m m m m
m m m m m m
m m m m m m
m m m a. m
m m m m m m
m m
Q.
CL a a a s
a a a a a a
a a a a a a
a a a a a
a a a a a s
a s
0
0
0
a
N E
c c
O O � O
c c
� O o O
c c
0 O O O
c c
O O 0
c c
c
U
m
N
U
d d
c@ c
d a)
c c
10 `6
`,4• e `M
c
CO E0
.E
m c C m
m m m M m
m m M m
m m
m m m
m m m m
m
2,
a LL _m a LL
N
a LL a LL
N N
a LL a LL
N N
a LL a LL LL
LL a LL a LL
N
a
i�
d
a) d a1 d
m N d d
❑
d d d
❑
d d a) d d
d C! d
❑
E
E
c❑ c
aJ m `) d m
u) c❑ u) c
N w N d d N
u) c❑ u) c
N d N d d N
w c u) c c
d N d m m
c h c❑ U) c
m d m `l d m
u)
N d
0 coc
a
a m
a@
n
cd
U)
= d d o d
dor N d
?
a) 2a N dd
d_nm@ (u
d@ a) 2-nd
d)
.9-
w U U w U
U w U U w U
U w U U w U
w U w U U
U W U U W U
U w
M r r M O
O O m m O m
r O r m r ,0
m O) M Q N
01 ,n M M r m
m m
d
r m m M N
Q) r
r M r r M r
m r r m r M
N 0) Q
r u1 Q N N
cl
m m N m
u) m m
N m
r m
N m
c 0
M N Q M t�I
N m N N m m
m Q r r m
r c0 r m W
Oi r Q oro r r
o m
M N r r r
N N
d LL
U
a
0 o a o o
o o o 0 0
a o 0 0 0 0
0 0 0 0 0 0
a a a o a o
0 0 0 0 0 0
0 0 0 0 0
C o 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
o 0
0 0
o 07 o O o
o ,ri N o O
O O ui O ,[1 to
LLJ N ui LL'1 0
o VI 0 0 0 0
o N
3 L
y a m
O N O O
r N m r m
O r-
r M O r 6
m m m m m r
O ,(] N O N r
N W m r
N r N r O
N N ,0
O r 0 0 0 i0
,0 m m M Q
,0 N
(0 r-
0 0
M
N
r N r r N
r r r r r
t N M
O m
o m M M m M
r m
C
aN M
M r ,0 M r
0) r O r m 0
M m N m r
m O r m M r
r ,0
d O
N
N mN N N
O O) r0 m N
Q Q N Q Q m
m m m O D) M
m
m m Q
r O r O m
M m W r r
m N M r r M
M M
N
a
W d
N
m
O
a
O r a 0
N r N N N
r m O r m N
r M O) r M r
m m N Q N
N m W M Q Q
M ,0 Mu0 N
m ,0 m ,0 Q
N ci m O m r
Q Q O CI M
O O
a
y
Q Q1 Q Q Q
(M 00 m M m Q
Q Q r m Q M
aJ a]
M Q O Qf Q
O ,n
m
m a
M m r m
m rn m m W r
Q O
r N m Q) N
N
N N N N Q
Q m r M M m
m r
m
an d
r
O m
r e- N r r N
r t-
04
N
N N
3
O
N O M N Q
M O M O
m O M m r
Ol O r r 0) m
O N O Q Q r
m 01 m m O
r Q r Q r
O m M G0
r r r
r m rn
O N
T
o
E d
m of m o
v v o v v o
r v of ori m
m m
of of o o 0
0 0
J
O
r
= 0
�'
N
N N N N m
N N Q m m r
N N M r r r
r Q r Q r
r m .- m
r N Q r N r
Q Q
N
E N =
N
VL
❑
LA
0
U
N 6
O r 0 0
r m O r m N
m m N Q N
M 0 M 0 N
N O m O O r
O O
d
a
N r N (V N
r M 0) r ci r
N m m C) Q Q
m ,0 m t0 Q
Q M Q O m M
U N
U
' L
Q m Q Q Q
O 01 ,0n O
M m m M m Q
O r O r 0)
Q Q r m Q M
O �0 �0 Q O
m m
N m N m W
M Q O o Q
Of r M O W
O 6
,0 N
N
O
y O' N
r M m r m
m M m m m r
N m C N
N N N N Q
v m r M M m
to r
U
d
r
O m
r N r N
r r r r r
r 01 O
N N
�
p U
N
Z a
Lo
9 E
m r
❑� c
U U U
U U
U
N 7
Cm
N N N
M M
2 N L W
v o o
ami
> > >
> >
AN
y m a V
N
a a a a a
a s
+�
d
t a r o
3 3 3 3 3
3 3
L
U a m d
m
E
m
Z
___
m m m
_
m m
m N N N N N
N N
��
•�
O
V-
m
C m d LL•
a
d
a a a
M M M
v v v
a d
a N ,n ,n ,n N
m❑❑❑❑❑
N N
❑❑
o d
c ja U
a
M M M
M M M
M M
M U U U U U
U U
O
m d
d
J J J
M M M {n 1A ,n
Q Q Q
6
t0 ,0 m
M❑❑
❑ m m r r r
m m
N
O
H m
d ,p d
m ,0 N N N
N t0 ,0
f`� M M❑❑❑
U U U
LL] LL� ,n
M C7 M�
❑❑❑
U U
th
U U
m a ,n
U N N N N N
�
N N
�
(i
c �0
a v
.
d
N (V
❑ ❑ ❑
❑ ❑ ❑
U
0 a 0
❑ ❑ ❑
,n 0� ifl
❑ ❑ ❑ ❑ ❑
�[]
❑ ❑
E Q
E
a o U U U
U U U m m m
U U U X X X
U U m m U
m U U U U U
U U
V
m
U U
a s a
Q Q Q
a a.
a
rn
?
' ' J J J
M M M M M M
Q Q Q M��
,0 ,0 ,0 ,0 m
m U U U U U
U U
N
l.1 E
d
m h N m m
N N N N N
c M M M M M
C? t7 M m m m
M M M M M
M r r N N N
M M
O
L
C C
�
'n ,n �n `n `n
,0 to h
m m to ❑❑❑
u1 U) ,n u)
0 .r.. .. .r... ter..
�.
�.
.,w
YI
� O
0 O O❑
C
❑❑❑❑ O
❑ ❑ ❑ ❑ ❑ ❑
U U U U U U
❑ ❑ ❑ U U U
U U U , , i
❑ ❑ O ❑ ❑
U U U U U
❑ m mr r r
U N cV N N N
m m
N N
�
7
Z •m o a
y
U U U U U
, , , ,
X X X
,
'o
O
O d m
E
t0 „7 m
M M M M M M
Q Q Q Q Q Q
LL1 N m N m
,n ,n ,n �n ,n
m❑❑ Q Q❑
m v'�
❑❑
N
O
a
c d 07 ?
Z p,
N N N N N
M th C7 lh M C7
M t+I M M M th
M M M t+1 M
(+1 U U U U U
U U
V
T v m m
2 E
� v n n n
Ln A Lh to A L'
Lb vh A Ln to L'
n L' v Ln �
U v Z
O
iA
O ❑ ❑ ❑ ❑
❑ ❑ ❑ ❑ ❑ ❑
❑ ❑ ❑ O ❑ ❑
❑ ❑ ❑ ❑ ❑
❑ m m m m m
m
m m
m a
_
c c
U
U U U U U
U U U U U U
U U U U U U
U U U U U
U a a a d
Q
m m
H K w 0)
Fil
•CL
i
O
0
V
Ei
O O O O O O O
O O O O
o 0 0 0 o vi (ri
yip •L" S" N V (� a00 M M
d j M M
O
r r m v m o
C . 0 Il C Il (U O
do V (/ � tN0 rn
G 2 w R
N
W m
W
O O O O O O O O O O O O O O O O O O O O O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 (ri 0 0 0 (ri o ui o o (ri o Lo ui vi
O
m m N M u0 0 0 0 N 0 m O 1� c
V m O M M m N N r O r C r M N
N N m M r CO M ^ M N N
M
m N O N m 0 M M m N O M O M (A M M M v m
M M r (O M fl� O m 0 Il� (p M O M N 00 M m M 7 M
V V N I- r m (o to i(I r I- V m n n t[I r U) r ([1 m
r mCI M O (U m m M m (A r m
r r r r N r r m r M r r N N r
r N
( MO m m O O m O O m O O m m m m m 0
m m R m m 0 m m m m m N (D m m 0 0O O m I�
� m (fi Oi
N N I- m r N N N N It
N M N Il
O O 7 M O O
�2 N
N
G�
M V M O m M O V (fl V' O V V' M
M O O M O M M O M m (n m (!I m M
r r m r r r r N N N N N N N r
ai
( MO M m O O m O O M O O m m m m m 0 v
m m v m (n o m m m m m N m m m o 0 D o m I-:
m m r M V r m m m m I� M M m N N r m m m m ry
❑ "' c
m m m
� to � � to �
> > >
d N ❑
C
M 7 V R m m m
m m m
M M M M M M
(/J f/J [n
10
C
> > > > > > >
> > > > > >
�
> > >
o
❑
O
3 3 3 3 3 3
o 0 0
n n �-
c R a v
0
n o 0 0 0 0 0
0 0 0 0 0 0
a n
C_
o o
N
3
E
3 3 3 3 3 3 3
3 3 3 3 3 3
M M? M? M
m m m 3 3
w
c
(p
m M M M
N N N M M M
(n ((� ((1 (() (A
M M M
a
o
z
N N N N C? M M
M M M M M M
N
0 0 0 0❑❑
U U U U U U
L] N L6 M M
❑ ❑ ❑
cn
��
❑ ❑ ❑ ❑ ❑ ❑ ❑
(n (n (n M (n
❑ ❑ ❑ ❑ ❑ ❑
( ( i i i (
((j (n
U U U ❑ ❑
o
L
U U U U U U U
U U U U U U
M M M M
U U
CL
O
fn
N N N M M M
NN N N N N N
N N N N N N
N N N N N N
N N N N N
N N N N
M M M M M M
(n (n ([1 N (n u]
N N N N N N N
(6 (0 f0 (U N (0
N N N N N N
N lO l9 f0 l0 (0
N N N N N N
a0 l0 (0 (V (0 l0
N N N N N
(0 (0 [6 (0 (0
N N N N
(0 N N
a a L
a a s n. a
a s a LL a a
a a a a LL LL
a a a a a
a a a a
L
c
0
?
'
U U U U OO o] 00
v v v
m m m m m m
>>>>>>
=0 fn fn (n fnfn
c c c m m
(n n v N N
a
c c
c c
3
c c
c
C 7 [f (!] (!] (A
M M M M M M
A 7
m E
U U U U V
N C t6 C
U N U U U
C (6 C
U U U U
C C
U U U U
C C
U U U U
C
C
LL N LL f6 LL
N @ LL N LL
L
N N
t0 N LL t6 N LL
N (p
(d LL �(�, LL
(p (p (p
N LL LL LL
A rL
NN N N
U ❑ ❑ U
N d N U
❑ U❑ U
N d N N
❑ U❑ U
N d N y
p U p U
N d
p U
C UJ !n
C C
(0 d d l0 2 N 10
U U
C C
d d N N d N
to y
C C
N W W N (D N
C C
N d (`6
C C C
C
(6 n c n
c c a
c a@ c n
c n (a c
c
m
d'
d N d N_ d
d= -C, d d e N
N= N d= N
d= N d W
N d d N
a a a R
U U W U U w U
U w U U w U
U w U U w U
U W U U U
U U U U
M O m (A M M
m m O M I- m
(n M m N N M
M N Lo N
(O N M m
(dj
M M N N M M M
m (n M N1-: M m
V M O m h V
V: M a f* N M
m (n N M N
� R m N m m
m o m m a
(D m O N Cl
m It m M
N Cl M M
L2
N (p
r
N LL
V
O O O O O O O
O O O O
o 0 0 0 o vi (ri
yip •L" S" N V (� a00 M M
d j M M
O
r r m v m o
C . 0 Il C Il (U O
do V (/ � tN0 rn
G 2 w R
N
W m
W
O O O O O O O O O O O O O O O O O O O O O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 (ri 0 0 0 (ri o ui o o (ri o Lo ui vi
O
m m N M u0 0 0 0 N 0 m O 1� c
V m O M M m N N r O r C r M N
N N m M r CO M ^ M N N
M
m N O N m 0 M M m N O M O M (A M M M v m
M M r (O M fl� O m 0 Il� (p M O M N 00 M m M 7 M
V V N I- r m (o to i(I r I- V m n n t[I r U) r ([1 m
r mCI M O (U m m M m (A r m
r r r r N r r m r M r r N N r
r N
( MO m m O O m O O m O O m m m m m 0
m m R m m 0 m m m m m N (D m m 0 0O O m I�
� m (fi Oi
N N I- m r N N N N It
N M N Il
O O 7 M O O
�2 N
N
G�
M V M O m M O V (fl V' O V V' M
M O O M O M M O M m (n m (!I m M
r r m r r r r N N N N N N N r
ai
( MO M m O O m O O M O O m m m m m 0 v
m m v m (n o m m m m m N m m m o 0 D o m I-:
m m r M V r m m m m I� M M m N N r m m m m ry
❑ "' c
m m m
� to � � to �
> > >
d N ❑
C
M 7 V R m m m
m m m
M M M M M M
(/J f/J [n
10
> > > > > > >
> > > > > >
> > > > > >
a a a a a a
> > >
O O M
>
❑
O
3 3 3 3 3 3
o 0 0
n n �-
c R a v
0
n o 0 0 0 0 0
0 0 0 0 0 0
a n
o o
r o
` a
E
3 3 3 3 3 3 3
3 3 3 3 3 3
M M? M? M
m m m 3 3
3
J 7
(p
m M M M
N N N M M M
(n ((� ((1 (() (A
M M M
U a N
z
N N N N C? M M
M M M M M M
N
0 0 0 0❑❑
U U U U U U
L] N L6 M M
❑ ❑ ❑
O M
O d d
❑ ❑ ❑ ❑ ❑ ❑ ❑
(n (n (n M (n
❑ ❑ ❑ ❑ ❑ ❑
( ( i i i (
((j (n
U U U ❑ ❑
(n
U U ❑
L
U U U U U U U
U U U U U U
M M M M
U U
( U m
CN] M
N N N M M M
M M O O
O O N
C
N N N N M M M
(n (n ((1 (A ([5 (h u]
M M M M M M
(n (n ([1 N (n u]
0 0 0 0❑❑
U U U U U U
([J m m M M
❑ ❑ ❑ ((1 �
M M M
(A (A ❑
U U
U U U U
?
'
U U U U OO o] 00
v v v
m m m m m m
>>>>>>
=0 fn fn (n fnfn
c c c m m
(n n v N N
m 00 Q (n
N N m❑
U
p
z OI O 7
m M M M
N N N N M M M
N N N M M M
M M M M M M
C 7 [f (!] (!] (A
M M M M M M
N m m 0 0
M M M M m
O O N
m M M m
d m
4] (n (n (n N N 4J
N ((J (n
N (n (n N (n
([] 4] N M
a❑ a
z a
U U U U U U U
U U U U U U
U U U U U U
U U U U U
U U U
U
C
m m m m m m m
m m m m m m
m m m m m m
m m m m m
m m m
m y
a d a a a a a
a a a a s a
a a a a a a
a a a a a
a a a R
@ d U U
F d' In N
m
0
h
Q
a
3
J
m
N
L
0
V
r
�r
CD
N
L
V
CL
s-
o o
4-
L
O
CL
W
O
.N
V
.I.d
ai
a
A
U U (n
� Z g
0
0 z cn
U LL z LL
o +
5S����C:l
cD2m:5 :�i20
0 o O o co
0 0 0 o v
0 0 0 o v
a
0
U
Z
0
0
m
CT
m
30
0
Q20
as
U)
a�
c
m
U
0
aD
X10
a�
U
CD5-26Li wp07 Ladder View
15000 17500 20000 22500 25000 27500 30001
Measured Depth
m
230
C
14400 14550 14700 14850 15000
Partial Measured Depth
SURVEY PROGRAM
CASING DETAILS
From Depth To
Survey/Plan
Tool T
D MD Nam
40.80 2200.00
CD5-26 wp07 (CD5-26)
GYD-GC-SS
7617.84 14351.00 7-5/8 x 9-7/8
2200.0014350.00
CD5-26 wp07 (CD5-26)
MWD+IFR2+SAG+MS
7804.50 29814.56 4-1/2 x 6-3/4
14350.00 14750.00
CD5-26L1 wp07 (CD5-26L1)
MWD-INC_ONLY (INC>10°)
14750.00 16250.00
CD5-261-1 wp07 (CD5-26L1)
MWD OWSG
14750.00 29814.46
CD5-261-1 wp07 (CD5-26L1)
MWD+IFR2+SAG+MS
m
230
C
14400 14550 14700 14850 15000
Partial Measured Depth
{
W
CL
V /
■O
�i
Q
n
o
■
rn
3
■ T
�1
T
0
p
Ln
Co
N
o
co
N
_
�
p a
U
N
�
T
C.
CO
r
rp
p
U
Ua
3
Cl)c�
C
�
p
O
_
J
J
N
CL
3
Cl) 1�
U
p p
m p
U
N
p
U
Q
N
C�
N
co N
.�-
■
p
�09 S
M
p
CD
o
,,^^
LO
�
3 >
M
■.
V
s
�s
C
T
c
c p
U
Q
rn
U Cl)
U)
w
U
o
QC?
,6
U
p
Q
U
ti
L
�
X
a
C
LO
p
U
T
N
�..�
N
LO
V
0
N
N
7.
m
(uiMsn 0009) bul4UoN
13:02, July 25 2019
CD5-26Li wp07
TC
View
SURVEY PROGRAM
SECTION DETAILS
From To Tool
MD Inc Azi TVD Dleg
TFace Target
Annotation
40.80 2200.00 GYD-GC-SS
14350.00 84.09 152.00 7617.75 0.00
0.00
KOP: 16%100' DLS, 25°TF, for 13'
2200.00 14350.00 MWD+IFR2+SAG+MS
14363.00 85.98 152.89 7618.88 16.00
25.00
Hold for 20'
4350.0014750.00 MWD -INC ONLY (INC>10°)
14383.00 85.98 152.89 7620.28 0.00
0.00
Start 41/100' DLS, -15.73°TF, for 134.25'
4750.0016250.00 MWD OWSG
14517.25 91.15 151.43 7623.64 4.00
-15.73
Hold for 56.84'
4750.00 29814.46 MWD+IFR2+SAG+MS
14574.09 91.15 151.43 7622.50 0.00
0.00 CD5-261-1 Tgt 01
Start 1 0/100' DLS, 165.39°TF, for 190.67'
14764.76 89.30 151.91 7621.75 1.00
165.39
Hold for 15049.81'
29814.56 89.30 151.91 7804.50 0.00
0.00 CD5-26L1 Tgt 02
TD: 29814.56' MD, 7804.5' TVD
CASING DETAILS
TVD MD Name
7617.84 14351.00 7-5/8 x 9-7/8
7804.50 29814.56 4-1/2 x 6-3/4
0
330
30
0
1435
14350
14540
14540-
14740
``
1
14740
14930
300 �(�
60
14930
15120
15120 -
15320
/;-
15320
15510
15510
15700
�, >>
15700
16290
16290
16880
16880
17460
270
g ~"-
---- -- 9 0
17460
18050
18050
1 8640
19220
0
19220 __
19810
0
19810
20400
l
`
0400 -
21580
90
---
240
120
21580
22750
2750
23930
`
12
3930
25110
/f
5110
26290
_
6290
27460
7460
28640
210---,.
/
150
8640
29815
180
13.04, July 25 2014
CD5-26Li wp07
TC
View
SURVEY PROGRAM
SECTION DETAILS
From To Tool
MD Inc Azi TVD
Dleg
TFace
Target
Annotation
40.80 2200.00 GYD-GC-SS
14350.00 84.09 152.00 7617.75
0.00
0.00
KOP: 16%100' DLS, 250TF, for 13'
2200.0014350.00 MWD+IFR2+SAG+MS
14363.00 85.98 152.89 7618.88
16.00
25.00
Hold for 20'
4350.0014750.00 MWD -INC _ONLY (INC>10q
14383.00 85.98 152.89 7620.28
0.00
0.00
Start 4%100' DLS, -15.73°TF, for 134.25'
4750.0016250.00 MWD OWSG
14517.25 91.15 151.43 7623.64
4.00
-15.73
Hold for 56.84'
4750.00 29814.46 MWD+IFR2+SAG+MS
14574.09 91.15 151.43 7622.50
0.00
0.00
CD5-261-1 Tgt 01
Start 1 %100' DLS, 165.39°TF, for 190.67'
14764.76 89.30 151.91 7621.75
1.00
165.39
Hold for 15049.81'
29814.56 89.30 151.91 7804.50
0.00
0.00
CD5-261-1 Tgt 02
TD: 29814.56 MD, 7804.5' TVD
CASING DETAILS
TVD MD Name
7617.84 14351.00 7-5/8 x 9-7/8
7804.50 29814.56 4-1/2 x 6-3/4
Minor Risked
0
8 60
i �+637
330
30
350
150
0
1435
14350 -- -
14540
14540
14740
/ t
14740
14930
300
60
90
14930
15120
15120
15320
)0
15320
15510
94$
15510
15700
15700
16290
D5-26 wp0
4599•
16290
16880
14499
270
I `+`+u
90
16880
17460
17460
18050
3
18050
18640
18640
19220
19220
19810
60
19810 --
20400
0400
21580
90
1580
22750
240
120
2750
23930
12
23930
25110
5110
26290
150
6290
27460
7460
28640
210
150
8640
29815
180
180
L
cn
U
CO
� v
:>
0-
LO ONJ
O
Q
V
m
d
_
J
LO�
U
NO
co
N
T
M d
ui �
M
NC?
LO
�
U
UJ
Co
U N
LOc�
N �
U
N
�
U
D
U
i
0
U
i
H
s
O
F
O
O/�
LOL
�
�
0,0000
N
0
/
U
O
LO
a
S�
M�
s
N
T
m
w
o
r� r
Lco
M
LO
LO
CL
�
m
CL
`n
�
U
co
U
co
N
(�
O
3
J
O
U
LO
T
J
CO
N
LO
V
O
N
In
T
7
7
(uin}sn 0059) bul4UoN
N
(�
3
J
O
U
L
cn
3
0
a
3
L
�
0
N
M
J m
LOT
�
U
U
N 11)
0
co
0
U
N
H
O
O
M
OS
y�
■
n
Oo
,^
o
M
s
LO
T
M
W
uCID
InCPLOLIS
m
a
�
v
�
0
U
i
N
O
d
�
O
LO
3
U
O
J
3
rn
C)
rl
LO
T
J
(D
N
LO
V
3
(ui/i}sn OOss) bulglJON
�
�
U
U
CD5-26L1wp07 Surface Location
M CPAI Coordinate Converter
- From:
I
Datum: NAD83 - Region: alaska
C' LatitudefLongitude Decimal Degrees
j C UTM Zone: [- South
State Plane Zone:q Units: u ft
i
r Legal Description (NAD27 only)
❑ X
To: — -- -- -
I Datum: NAD27_j Region: alaska
f f
Latitude/Longitude Decimal Degrees
r UTM Zone: True South
C- State Plane Zone: q Units: us -ft
r Legal Description (NAD27 only)
Starting Coordinates:- Ending Coordinates: — ---
X: 11489091.09 x 349057.935239092
Y: 15965526.59 Y: 15965780.63534594
^Transform I
CD5-26L1wp07 Surface Location
M CPAI Coordinate Converter
From:
Datum: NAD83 Region: alaska
C Latitude/Longitude Decimal Degrees
C` UTM Zone: `— r- South
t: State Plane Zone: q Units: us -ft
r Legal Des_rptier: jtrA[i27 only
Starting Coordinates: - --- - - -
X: 11489091.09
Y: 15965526.59
Quit Help
i
Datum NAD27 - Region: lalaska
{'
Latitude/Longitude IDecimal Degrees
UTM Zone True F South
X" State Plane Zone: q Units: us -ft
Legal Description (NAD27 only)
r- Legal Description
Township: 011 N Range: 004 E
Meridian: fu -----,l Section ri8
FNL437.34287 FEL 2919.1180
r .............. .............__.
Transform ..._.....:.........., Quit Help
r
CD5-26L1wp07 Surface Casing
M CPAI Coordinate Converter
From: - ---- -- - -- -
Datum:gp83 + Region: alaska
f_' Latitude/Longitude IDecimalDegrees +
i" UTM Zone:` )" South
Stake Plane Zone: F7-:1 Units: us -k +
f" Legal Description (NAD27 only)
r Starting Coordinates:-- ---------- —
X: 11489184.88
Y: 15965146.04
CD5-26L1wp07 Surface Casing
M CPAI Coordinate Converter
Im��
To:
Datum: NAD27 Region: alaska +
Latitude/Longitude Decimal Degrees��
UTM Zone True r- South
0' State Plane Zone: I4 -IJUnits: us ft +
C Legal Description (NAD27 only)
r— Ending Coordinates
i
1
_..........................................
Transform i
From: ��----- _
Datum: Ngpg3 + Region: alaska
r
Latitude/Longitude Decimal Degrees
t UTM Zone: — r- South
State Plane Zone: 4 + Units: us -ft +
t✓' �eaaR Decrpkioro INgD2r r_ ly)
- Starting Coordinates: - - - -
X: 11489184.88
Y: 15965146.04
l
X: 349151.7109168
Y: 5965400.07995503
Quit Hefp
- ❑ X
Datum: NAD27 Region: alaska +
f LatitudelLongitude IDecimalDegrees
t" UTM Zone: True j South
r State Plane Zone:. 4 Units: us ft +
ire Legal Description (NAD27 only)
Legal Description - - -
Township 011 N Range: 004 I`
Meridian JU -1 Section: 118
FNL + 815.96247 IFEL 2819-1787
:................._.......
. ...
......
..............._.......I
Transform s' Quit Help
CD5-26L1wp07 Kick-off Point
n CPAI Coordinate Converter
I !- From: -_— -- -- _
I Datum: INAD83 I Region: alaska
i
• Latitude/Longitude IDecimal Degrees
• UTM Zone: r South
i
t* State Plane Zone q Units us ft
r Legal Description (NAD27 only)
Starting Coordinates:
— ❑ X
To: _—.—
Datum: NAD27 Region: alaska
i Latitude/Longitude IDecimalDegrees
r UTM Zone: ITrue South
C- Stake Plane Zone: -71
q Units: us -ft
f Legal Description (NAD27 only)
- - r- Ending Coordinates:
X: 11492558.1 f
Y: 15955019.83
CD5-26L1wp07 Kick-off Point
l!3 CPAI Coordinate Converter
From:
Datum: NpD83 Region: alaska
C Latitude/Longitude Decimal Degrees
r UTM Zone:® r South
6 State Plane Zone: q Units: u. -it
r Legal Des,-_npt7en (t-iAD2_f e
Starting Coordinates: —
>e- 11492558.1
Y: J5955019.83
X: 352524.551796524 _
Y: 5955273.69259662
Transform Quit Help
— ❑ X
Datum: NAD27 Region: alaska
{ Latitude/Longitude Decimal Degrees
f UTM Zone: True r South
i' State Plane Zone: q Unks: us F71
C' Legal Description (NAD27 only)
Legal Description
Township: 011 N _ Range: 004 E + {
Meridian: U , Sec6on:29
FNL 314.19089 FEL 4562.4764
Transform Quit Help
CD5-26L1wp07 TD
M CPAI Coordinate Converter
From:
Datum: NAD83 Region: jalaska i
r Latitude/Longitude IDecimalDegrees
UTM Zone: South
i
r State Plane Zone: q Units: us ft
r Legal Description (NAD27 only)
Starting Coordinates:
X: 11499562
Y: 15941235
CD5-26L1wp07 TD
M CPAI Coordinate Converter
From:—
Datum: NAD83 Region: alaska
(� Latitude/Longitude Decimal Degrees
UTM Zone: r- South
Skate Plane Zone: q Units: us ft =
r" Legal Description IN,`r' :- onlpJ
❑ X
To: -- - - - -- - -- —
Datum: INAD27 I Region: ralaska
l- Latitude/Longitude Decimal Degrees =
UTM Zone: True South
t: State Plane Zone: q = Units: us -ft =
Legal Description (NAD27 only)
Ending Coordinates:
X: 359527.921422306
Y: 5941488.513251 4...
Quit Help
- ❑ X
Datum: NAD27 Region: alaska
f- Latitude/Longitude IDecimalDegrees
r UTM Zone True South
I
State Plane Zone: 1 q Units: us -ft
r:- Legal Description (NAD27 only)
Starting Coordinates: Legal Description -
= 1499562 Township: 010 FN--,
Range: 004 E _
Y: 15941235 Meridian: U = Section:fq—
FNL = 3403.9891 FEL 2616.2171
Transform Quit Help
REV I DATE I BY
I CK I APP DESCRIPTION REV I DATE I BY
APP I DESCRIPTION
1 4/24/15 1 CZ
I DB I C.A. I UPDATED PER K150003ACS 1 2 5/2/16 CZ GD
I C.A. UPDATED PER K160003ACS
ALPINE SATELLITE DEVELOPMENT
LL
LOCATION OF
THIS SURVEY
T12
CD -5
PAD
T11 N --
CD4 TO ALPINE
CD5
D
���`�' ACCESS ROAD
,.t,.,, ..•'1„
CD
N
z
r
C51 1
A
p
P
o
P LL IT cD1 iP
VICINITY MAP
NOT TO SCALE
LEGEND:
O PROPOSED CONDUCTOR
• EXISTING CONDUCTOR
SECTION 7, T. 11 N., R. 4 E., U.M.
SECTION 18, T. 11 N., R. 4 E., U.M.
p NO
CD -5
OF
AD
SNpp�pER
0 �S\GN ��QQaoQo�QaQaa�
��oQ�Qaa�joa
x !_
OQO �tP\-
C'O .
L' LAiWO�
WN � � • "
PLANT
N
N
a
NOTE:
15.40 sz"
�
CONDUCTOR
CD5—x14 WAS PLUGGED AND
ABANDONED
LCMF
APRIL 2016.
���0
KUUKPIK
UMIAQ
ALPINE SURVEY OFFICE
PHONE : 907-670-4739
ALPINE
MODULE: CD50
UNIT: CD
ConocoPhillips
ALPINE
PROJECT
CD -5 WELL CONDUCTORS
Alaska, Inc.
AS -BUILT LOCATIONS
CADD FILE NO.
DRAWING NO:
PART:
REV:
15-03-02-1
04/18/2015
1 CE-CD50-1025
1 1 OF 3 1
2
L
4-J
L40
m
L
O
N
L
Q�
F–
L-
0
–
L0
O
c
V)
Q)
N
a -J
O
4-J
L
Q)
N
L
U
N
t1A
fB
E
4-
0
O
O
m
C: Ln
E O
U
.O N
Z 0
a Ln
Ln
C:L
O_ O
ro
O v
N_ L
� X
O �
O �
O �
c
� Cd
+1
Ln
a;o
N
Lu
■
+j
Ln
U
m
L
Ln
a)
4A
c
a)
CO
U
m
L.
c
m
N
v
I--
4.J
bD
ro
C
O
U
C
O
v
^N
�W
�. D
L.
Q�
a�
C
O
—_
E
4J
4J
Q
++
E
N
•-
4
`�-
O
41
-0
C
+�+
C
U
L
U
O
a+
_0C
C:
C
41
c:
Cv
a�
Ln
O
UA
cn
Q
C
O
�
O
�
O
C:
.�
u
OLn
Q
O
_0
3
a)
L
4
O
—
U
f0
Cn
N
N
Q
Q
tab
=
m
O
J
O
N
=3
O
U
'-'
�
Q
ca
Q
,4-
O
0
O
Ln4-1
O
a-1
Q)
L
CB
L
++
ra
Ln
C:
O
C_
—
a
_..I
+,
4J
L�iA
U
O
� Nl
V
E
N
�G
N
L
a)
O-
U
bA
C
=3
-0
Q)
a,
Q
C
O
U
(1
Ln
L
C
ca
U
Q
4�
C
E
-
QJ
'n
2
N
L
_
LL
Ln
a)
4A
c
a)
CO
U
m
L.
c
m
N
v
I--
4.J
bD
ro
C
O
U
C
O
v
^N
�W
�. D
L.
Q�
■
L
Q
m
iB
4-
0
L
fa
a
N
t
a••+
fu
A
U
Q
m 0-
a� L
a -d
L
00 v)
4, a,
N
O
Oroo Co
fB
f0 4— aL)
� N �
c o �
U N a
N U
t O i
fa U
Z;
U N
fB
0 0
c +;ro—_
aJ —
4 a)
O
ro
L N
U ate+
15-
a�
t
N
O
L
�
fTs
>
M
L
s
a••+
O
_
N
U
N
L
U
aJ
Q
O
t
V
o
U
C
aJ
G�
m
>
wo
>
+�
L
a)
N
—
U
N
Q
s
'?�
0
N
U
U
H O
v
O
L
O
;7j
L m
C) dA
N
N
0
U
>
._
U
U
fD
V 4-+
u
O
O
=3
O
L.
c
CT
-0
aa)
aJ
�
N
a )
CL al
�[
N
M L
L1
C
()
H 0
,}
—
u
0
O a)
>
U
i
Q
0
V N
>
L
L
C:
0
=
fB
cu aJ
0
N
o
U
++
m
u
N
Y s
y ++
N
N
fTs
0
(B
L
fTs
fp
L
0
c
O
v
0� i
TRANSMITTAL LETTER CHECKLIST
WELL NAME: Lw_ (
PTD: Z'/9 —1d�3
Development _ Service _ Exploratory Stratigraphic Test _ Non -Conventional
FIELD: POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
/
LATERAL
No. /0 7 , API No. 50-Z0 -ZLE&I, -I' & -_5�2CD
i/
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
- -� from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100
19
Well Name: COLVILLE RIV UNIT CRU CD5-26L1 Program DEV Well bore seg
PTD#:2191080 Company ConocoPhillips Alaska _Inc. _ Initial Class/Type
DEV/PEND GeoArea 890 Unit On/Off Shore On Annular Disposal ❑
Administration
1
Permit fee attached
NA
I2
Lease number appropriate
Yes
Surf Loc & Top Prod Int lie in ASRC-NPR4; Portion of Well Passes Thru ASRC-AA092344;
3
Unique well -name and number
Yes
Portion of Productive Interval lies in ASRC-NPR2; TD lies in ASRC-NPR5.
4
Well located in a defined pool
Yes
COLVILLE RIVER, ALPINE OIL - 120100, governed by CO 443C.
5
Well located proper distance from drilling unit boundary
Yes
CO No. 4430 contains no spacing restrictions with respect to drilling unit boundaries.
6
Well located proper distance from other wells
Yes
CO No. 443C has no interwell spacing restrictions. Wellbore will be more than 500'
7
Sufficient acreage available in drilling unit
Yes
from an external property line where ownership or landownershipchanges.
8
If deviated, is wellbore plat included
Yes
As planned, well conforms to spacing requirements of CO 4430
9
Operator only affected party
Yes
Appr Date
10
Operator has appropriate_ bond in force
Yes
Max formation_ pressure is 3950 psig(7.9 ppg EMW ); will drill w/ 8.8-10.8 ppg EMW
VTL 8/13/2019
11
Permit can be issued without conservation order
Yes
Appr Date
12
Permit can be issued without administrative approval
Yes
MPSP is 3163_ psig; will test BOPS to 3500 psig
13
Can permit be approved before 15 -day wait
Yes
SFD 7/31/2019
14
Well located within area and strata authorized by Injection Order # (put 10# in comments) (For
NA
I15
All wells within 1/4 mile area of review identified (For service well only) - -
NA
H2S measures required
16
Pre -produced injector: duration of pre production less_ than 3 months (For service well only)
NA
NA
17
Nonconven. gas conforms to AS31.05.030Q.1-.A),(j.2.A-D)
NA
Permit_can be issued w/o hydrogen sulfide measures
18
Conductor stringprovidedNA
Geology
36
Engineering
19
Surface casing protects all known_ USDWs -
NA
20
CMT vol adequate to circulate on conductor & surf csg
NA
21
CMT vol adequate to tie-in long string to surf csg
NA
22
CMT will cover all known productive horizons
No
Productive interval will be completed with uncemented pipe with frac ports
23
Casing designs adequate for C, T, B & permafrost
Yes
24
Adequate tankage or reserve pit
Yes
Rig has steel tanks; all waste to approved disposal wells
25
If a re -drill, has a 10-403 for abandonment been approved
NA
26
Adequate wellbore separation proposed
Yes
Anti -collision analysis complete; Major risk failures: CD5-90, CD5-98 in zone
27
If diverter required, does it meet regulations
NA
Appr Date
128
Drilling fluid program schematic & equip list adequate
Yes
Max formation_ pressure is 3950 psig(7.9 ppg EMW ); will drill w/ 8.8-10.8 ppg EMW
VTL 8/13/2019
29
BOPEs, do they meet regulation
Yes
30
BOPE press rating appropriate; test to (put psig in comments)
Yes
MPSP is 3163_ psig; will test BOPS to 3500 psig
131
Choke manifold complies w/API RP -53 (May 84)
Yes
32
Work will occur without operation shutdown
Yes
33
Is presence of 1-12S gas probable
Yes
H2S measures required
34
Mechanical condition of wells within AOR verified (For service well only)
NA
35
Permit_can be issued w/o hydrogen sulfide measures
Yes
Although H2Swas not encountered in offset wells, rig will be equipped with operational _sensors/alarms.
Geology
36
Data presented on potential overpressure zones
Yes
Planned mud weights appear adequate to control the operator's forecast of most likely pore pressures
Appr Date
37
Seismic analysis of shallow gas zones
NA
in the operator's geologic prognosis._ No abnormally geopressured strata are anticipated. Managed
SFD 7/31/2019
i38
Seabed condition survey (if off -shore)
NA
Pressure Drilling technique will be used to maintain borehole stability in shale sections.
39
Contact name/phone for weekly progress reports_ [exploratory only]
NA
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Commissioner Date
,//5 1