HomeMy WebLinkAbout220-011DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20761-61-00Well Name/No. COLVILLE RIV UNIT CD5-23L1-01Completion StatusWAGINCompletion Date3/3/2020Permit to Drill2200110Operator ConocoPhillips Alaska, Inc.MD11001TVD7452Current StatusWAGIN5/18/2020UICYesWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR/ResNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC3/23/2020 Electronic File: CD5-23L1-01 EOW NAD27.pdf32222EDDigital DataC3/23/2020 Electronic File: CD5-23L1-01 EOW NAD27.txt32222EDDigital DataC3/23/2020 Electronic File: CD5-23L1-01 EOW NAD83.pdf32222EDDigital DataC3/23/2020 Electronic File: CD5-23L1-01 EOW NAD83.txt32222EDDigital Data0 0 2200110 COLVILLE RIV UNIT CD5-23L1-01 LOG HEADERS32222LogLog Header ScansC5/8/20207727 11001 Electronic Data Set, Filename: CD5-23L1-01 GAMMA RES.las33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 2MD Final Log.cgm33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 5MD Final Log.cgm33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 5TVDSS Final Log.cgm33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 2MD Final.pdf33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 5MD Final.pdf33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 5TVDSS Final.pdf33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 EOW NAD27.pdf33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 EOW NAD27.txt33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 EOW NAD83.pdf33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 EOW NAD83.txt33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 Survey Listing.txt33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 Surveys.txt33004EDDigital DataMonday, May 18, 2020AOGCCPage 1 of 3CD5-23L1-01GAMMA RES.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20761-61-00Well Name/No. COLVILLE RIV UNIT CD5-23L1-01Completion StatusWAGINCompletion Date3/3/2020Permit to Drill2200110Operator ConocoPhillips Alaska, Inc.MD11001TVD7452Current StatusWAGIN5/18/2020UICYesWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYMud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date: 3/3/2020Release Date: 1/27/2020C5/8/2020 Electronic File: CD5-23L1-01_Final_TD @ 11001 Unconfirmed.csv33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01_Final_TD @ 11001 Unconfirmed.xlsx33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01_25_tapescan_BHI_CTK.txt33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01_5_tapescan_BHI_CTK.txt33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01_output.tap33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 2MD Final Log.tif33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 5MD Final Log.tif33004EDDigital DataC5/8/2020 Electronic File: CD5-23L1-01 5TVDSS Final Log.tif33004EDDigital Data0 0 2200110 COLVILLE RIV UNIT CD5-23L1-01 LOG HEADERS33004LogLog Header ScansMonday, May 18, 2020AOGCCPage 2 of 3
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-103-20761-61-00Well Name/No. COLVILLE RIV UNIT CD5-23L1-01Completion StatusWAGINCompletion Date3/3/2020Permit to Drill2200110Operator ConocoPhillips Alaska, Inc.MD11001TVD7452Current StatusWAGIN5/18/2020UICYesComments:Compliance Reviewed By:Date:Monday, May 18, 2020AOGCCPage 3 of 3M. Guhl5/18/2020
Transmittal #1273 Detail
Date: 5/8/2020
To (External Party):From (CPAI Contact):
Email*: abby.bell@alaska.gov Email*: richard.e.elgarico@conocophillips.com
First
Name*:Abby First Name*: Ricky
Last Name*: Bell Last Name*: Elgarico
Phone
Number:(907) 79 Phone Number: (907) 265-6580
Company: AOGCC Company: ConocoPhillips
Address: 333 West 7th Ave.Address: 700 G Street
City: Anchorage City: Anchorage
State: AK State: AK
Zip Code: 99501 Zip Code: 99501
Transmittal Info
Sent Via: FTP Tracking #:
Justification:
Data Detail
Quantity*:Description*:Type*:
1 CD4-215l1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 CD5-23L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 CD5-23L1-01 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 3R-105 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-105L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-107 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-107L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 CD4-214L1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 3O-04L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3O-04L1-01 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
Received by the AOGCC 05/08/2020
PTD: 2200110
E-Set: 33004
1 3O-04L1PB1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF
Digital
Attachments:
Received By:
___________________________
Signature:
___________________________
Date:
_________________
Approver:
___________________________
Signature:
___________________________
Date:
_________________
Abby Bell Abby Bell 05/08/2020
! "# $
%&' %&' &(! )))))))))))))))))))))) * +*,
&! - !.
. /! &
!0
$
1 2
%&
!
/* (3 ! * 4 5 ,6*-&!&
!
(*
,(
* % 76(" 892:034
9:
,
+9*; <0,= 5 $+
/* (3 9 .&24 , <0,= 7&6 &
!
(* #> $> ?>
,% #> $> ?>= <0,= ,*;(!( <0,=
, #> $> ?>
* %*
$@3 *4&1 .(
(( 6>0 ,A<0,=
! * *(!
3( <4
+
1
9
,,
<
/
* B* C @ &
-
$
*(*
+
+*! C @ &
",D%&,"6=3<4 <
&,&8%&
:<,"6%"
2
:
* < (
3:A+.+( . *4
D
,
* ( ><:
,
+ *
><:
$>%3*4
/>D
6
,,"
:8
8
%&
&"6=,%
&
<<%%
&
!! "#!$#%$&
'
()*+$,-&.'*
''*'*'
/ &*
/&0-& &&1
1''
/ &
/&0-& &&1
/ &
/&0-& &&1&00' &0'
* *
*&&**&*
* *
*
*
+
.
112.
! * * A 7$(*! .
.! .A* **
( ,$(+ *
.
! !
+.
.+!!$.
*. $. $.!+ **.! .(! . !
.*!
.*+** .BA$.(
**$!!$
* +(*$
-#
%&.%&"6&"<"&,%&6"
6
%&,"6
:,6"",,%&",D< ",,%&",D,=D
"%?" "<"&,%&6"
6
<
&,
",
9
,,
< ,
20
#)"",!$##
*
#)"",!$##
,9%&6"
6
%(@. * 3<0,=(,9 !E(
F&
!E (4
%?" ",D",3<4 8"6",3<0,=4
/0/G
DH
71><27>2/,=%.:6,6"."<"&,I""?".",
513434 ** *(!
6
,%
&,",
'1
(,
>9 >9 ;F >
6
"+ 6"+
:A,
+
>9 >9
:!>/26 10
! A 1$(! .
.!
By Samantha Carlisle at 2:54 pm, Apr 08, 2020
DLB 04/17/2020
G
DLB4033
RBDMS HEW 4/14/2020
Colville River Field/Alpine Oil Pool
Completion Date
3/3/2020
HEW
3725
VTL 4/14/20
011
7
DSR-4/8/2020
!"
#
$%
&""#'
&#'
!"
(
)
!*#
#
!
!
++
&
!
*
"#
, +
!"#$%
"$&!
'%
-" "$(%!)(!
&!.
/!
*
0
)"
)"
*
)"
1*
)"
2
)"
3
)"
2
)"
(
)"
((
)"
(
)"
(1
)"
(4
)"
(5
)"
)"
(5
$6-
)
'
"
7'
8"7'
&"".
! +#
%
'
+
&*"
%
%+
!
!
"'
&*"
%
'
!%
'
%!+%!
'
&*
9&
*#
#
&
%
(
(34
(2
0-$$0)
6:-6
"
",
& 8$6)$
-
- ;
<
!"*
)
#
'
"
'
* #
&"".+
&
!
%
%+
!
"'
'
&*"
"'
&+
%
'
%
(
(34
!"*+"
,!$-
)"
*
!
&
'
*&
"
&""#
#
%
'
*
!" '
&#'
#
'
% +
%'
%&
&
'
%
(
(34
&!.
"
&!.
+&
7
.
/0
#.
!
"
!
9&
!"
%
"%
!
,
&*"
!"
+"
!
!
=14
"%
%
=11
&#
%
!
!
!
+
!+
*#
#
%
++
"%
"
"&
*
&*"
!
$0'
"
!
!
#
&
& %
"%
%& +
"
"
!
%
!
%&
"
!
%
"% #
++
- !
++
%
"%
;
=
0
)> '
;
)> '
;= +=0
)> '
;
%
'
;
&%% #
)> '
$*
'
$!
/)
%
/& +
)
!
: #
?&
!+'
0&
'
?
8 +
*
@
"
%!
"
&"
+
!
%
!
"
#
!"
!
/)
&"*
%
$0
"&
*
1
+
A
3=(2=((==
/
+
!
%+
"
'
*
%
!
*A
/&
&
(
(34'
&*"
%
'
!%
'
%!+%!
'
&*
9&
*#
#
&
'
&+'
*&
"
%
#'
%"* #'
&
&'
&
"%
'
&
&
'
'
+ !" '
% +#
/
+
!
%+
"'
*
&""#
!
*A
&*"
#
*#
"
9&
*#
(
(34
/&
&
(
(34'
!
!
"
!"
+"'
&""#
#
%
'
&#'
!
9&
&+'
*&
"
#
'
% +
%'
%&
&
6%
!
$
B
0
7
+
;
/
$%
$76+
=('
@
/"
(13'
7
-
"
(13C
&"*
6%
"
&
%!
&
! ,
%"
/
!
%
*
%"
?A
(2
6
!
%+
9&"
(
(34
'
%&
&
3'
&*"
!
2
#
"% '
&
%
'
*"'
! !
&
!
&%% "
!&
!
!
#
"& %
+
"+
!
!
"+
)
!
"%
%
%&
"
"
!
"& %
"% '
"
'
"
(
!
!
%& +
#
!
%
"
(C
&*"
%
"
!
*
% #
%& '
!+
!
%
& !
!
$%
8 +'
0
'
6
/&"%'
D#&
/&"%'
&*"
* '
;
)> '
0
)> '
!&='
$!
A%
8"
=14
6
7(( &*"
!
#
"% '
&
%
'
*"
4/7/20
!"#$%&'( ) *)* +,-'.'$.%-'+ !" )!"
))
(/&
)+
(/&
+
0
(/&)
(/&++1/& ,&22&$&3 &/&*
&&&'4/(2&%-)
5* ,25+ )
6/&5*
6/&
Last Tag
Annotation Depth (ftKB)End Date Wellbore Last Mod By
LAST TAG:CD5-23L1 jennalt
Last Rev Reason
Annotation End Date Wellbore Last Mod By
REV REASON: OPENHOLE SIDETRACK 4/4/2020 CD5-23L1 jennalt
Casing Strings
Casing Description
OPEN HOLE
OD (in)
6 3/4
ID (in)Top (ftKB)
8,621.0
Set Depth (ftKB)
27,430.0
Set Depth (TVD)…Wt/Len (l…Grade Top Thread
Notes: General & Safety
End Date Annotation
4/4/2020 NOTE:
HORIZONTAL, CD5-23L1, 4/8/2020 10:59:29 AM
Vertical schematic (actual)
X O
OPEN HOLE; 8,621.0-27,430.0
INTERMEDIATE; 34.0-8,620.8
NIPPLE; 8,227.7
NIPPLE; 8,183.1
XO THREADS; 8,133.5
PACKER; 8,129.3
XO THREADS; 8,121.5
GAS LIFT; 6,398.3
GAS LIFT; 5,882.0
GAS LIFT; 3,583.3
SURFACE; 37.0-2,219.6
INJ VALVE; 2,070.9
NIPPLE; 2,070.9
CONDUCTOR; 33.3-115.0
HANGER; 31.0
WNS INJ
KB-Grd (ft)
36.55
Rig Release Date
1/24/2018
CD5-23L1
...
TD
Act Btm (ftKB)
12,687.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032076160
Wellbore Status
INJ
Max Angle & MD
Incl (°)
91.96
MD (ftKB)
11,234.74
WELLNAME WELLBORE
Annotation
LAST WO:
End DateH2S (ppm)DateComment
HORIZONTAL, CD5-23L1-01, 4/8/2020 11:00:50 AM
Vertical schematic (actual)
X O
OPEN HOLE; 8,621.0-27,430.0
INTERMEDIATE; 34.0-8,620.8
NIPPLE; 8,227.7
NIPPLE; 8,183.1
XO THREADS; 8,133.5
PACKER; 8,129.3
XO THREADS; 8,121.5
GAS LIFT; 6,398.3
GAS LIFT; 5,882.0
GAS LIFT; 3,583.3
SURFACE; 37.0-2,219.6
INJ VALVE; 2,070.9
NIPPLE; 2,070.9
CONDUCTOR; 33.3-115.0
HANGER; 31.0
WNS INJ
KB-Grd (ft)
36.55
Rig Release Date
1/24/2018
CD5-23L1-01
...
TD
Act Btm (ftKB)
11,001.0
Well Attributes
Field Name
ALPINE
Wellbore API/UWI
501032076161
Wellbore Status
INJ
Max Angle & MD
Incl (°)
101.43
MD (ftKB)
9,580.31
WELLNAME WELLBORE
Annotation End DateH2S (ppm)DateComment
Page 1/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/19/2020
18:00
2/20/2020
00:00
6.00 DEMOB WHDBOP RURD P Remove front of tiger tank dike, bed
truck on location, remove tiger tank
from dike. NES tire guy on locaton,
check and air up tires in preparation of
Rig Move, Load out remaining fluid
from rig pits, blow down steam lines,
continue pre-move checklist, crane
broke down call out mechanic, grader
broke down. Crane up and running
remove CD5-23 wellhouse and stage
out of rig path. grader on location,
prep location for rig, continue
unloading pits
0.0 0.0
2/20/2020
00:00
2/20/2020
00:30
0.50 DEMOB WHDBOP RURD P Continue unloading fluid from rig pits,
prep well for rig, and secure cellar
flooring, NES trucks on location
0.0 0.0
2/20/2020
00:30
2/20/2020
02:30
2.00 DEMOB WHDBOP RURD T Wait on vac truck to return for final
load. PJSM with Rig crew and
operators, vac truck experienced
mechanical failure on pony motor at
10 acre pad, mech dispatched from
Deadhorse. work unloading NaBr or
milling fluid to get truck empty to
unload last load of New Mud from rig.
0.0
2/20/2020
02:30
2/20/2020
06:00
3.50 DEMOB WHDBOP RURD T Mobilize vac truck to CD1 mud plant to
offload NaBr into upright,
2/20/2020
06:00
2/20/2020
08:00
2.00 DEMOB WHDBOP DMOB P Crew change, Vac truck for last load of
mud on location 06:00, spot in and off
load while PJSM with NES rig move
crew. Pits to jack, spot sow, pull mats.
0.0 0.0
2/20/2020
08:00
2/20/2020
08:30
0.50 MIRU MOVE MOB P Move service mod off well, back to
edge of pad.
0.0 0.0
2/20/2020
08:30
2/20/2020
09:18
0.80 MIRU MOVE MOB P Sub to jack, spot sow, pull mats, open
barn doors, pull sub off well, move rig
down pad.
0.0 0.0
2/20/2020
09:18
2/20/2020
10:00
0.70 MIRU MOVE MOB P Back rig over well CD5-23i, spot up,
place mats, set sub on mats, rig off so,
measure and spot inner mats for
service mod.
0.0 0.0
2/20/2020
10:00
2/20/2020
10:54
0.90 MIRU MOVE MOB P Spot service mod next to Sub, spot
outer mats, set down, rig off sow.
0.0 0.0
2/20/2020
10:54
2/20/2020
13:00
2.10 MIRU WHDBOP RURD P Extend PUTZ, hook up comms, stage
Tioga on cellar, set stack - 4 point,
square up with turnbuckles.
0.0 0.0
2/20/2020
13:00
2/20/2020
15:00
2.00 MIRU WHDBOP RURD P String haywire, attach to CTC, PJSM,
pull test to 900 psi on tugger
*** Note: Rig Accept @ 13:00 hrs
0.0 0.0
2/20/2020
15:00
2/20/2020
18:00
3.00 SLOT WELLPR CTOP P Secure coil to reel, cut off CTC, hang
reel in slings
0.0 0.0
2/20/2020
18:00
2/20/2020
19:00
1.00 SLOT WELLPR CTOP P Remove stripper from INJH, clean,
inspect, and swap out 2" Brass to 2-
3/8" Brass.
0.0 0.0
2/20/2020
19:00
2/20/2020
19:30
0.50 SLOT WELLPR CTOP P NES on location, PJSM with crew 0.0 0.0
2/20/2020
19:30
2/20/2020
20:15
0.75 SLOT WELLPR CTOP P Remove King Pin/Booster, open
bombay doors, Load out 2" coiled
tubing reel
*** Note: 2" String #53724/Spool
#16631
0.0 0.0
Rig: NABORS CDR3-AC
Page 2/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/20/2020
20:15
2/20/2020
20:45
0.50 SLOT WELLPR CTOP P Bring in, and set 2-3/8" reel
*** Note: 2-3/8" String #5770
(SLB)/Spool #DR209503
0.0 0.0
2/20/2020
20:45
2/20/2020
21:45
1.00 SLOT WELLPR CTOP P Install King Pin/Booster, close bombay
doors and secure, lay down spill dike
on bombay doors. set reel into saddle
clamps.
0.0 0.0
2/20/2020
21:45
2/20/2020
22:21
0.60 SLOT WELLPR CTOP P Install stripper and hook up hydraulic
lines
0.0 0.0
2/20/2020
22:21
2/20/2020
23:21
1.00 SLOT WELLPR CTOP P Swap out 2" gripper blocks to 2-3/8"
gripper blocks
0.0 0.0
2/20/2020
23:21
2/21/2020
00:00
0.65 SLOT WELLPR CTOP P Swap out INJH Gooseneck rollers 0.0 0.0
2/21/2020
00:00
2/21/2020
03:00
3.00 SLOT WELLPR CTOP P Finish swapping out gripper blocks
and goose neck rollers, and inspect.
0.0 0.0
2/21/2020
03:00
2/21/2020
06:00
3.00 SLOT WELLPR CTOP P Continue securing saddle clamps and
torque to spec, install inner reel iron
as per RP.
0.0 0.0
2/21/2020
06:00
2/21/2020
08:00
2.00 SLOT WELLPR CTOP P test wire - good. Install pressure
bulkhead, string rope for haywire pull.
0.0 0.0
2/21/2020
08:00
2/21/2020
16:00
8.00 SLOT WELLPR CTOP P Swap BOP rams, and horses head
rollers, secure inner reel iron,
0.0 0.0
2/21/2020
16:00
2/21/2020
18:00
2.00 SLOT WELLPR CTOP P Crew change, cleared inside reel ice
and snow, installed grapple and cable,
placed tugger into sheave,
0.0 0.0
2/21/2020
18:00
2/21/2020
19:45
1.75 SLOT WELLPR CTOP P PJSM, pull test grapple and re-torque,
Stab coiled tubing into INJH, trimmed
coil (5.0')
0.0 0.0
2/21/2020
19:45
2/21/2020
20:45
1.00 SLOT WELLPR CTOP P PJSM, RU LRS, PT line 2,500 psi,
load 5 bbl into reel
0.0 0.0
2/21/2020
20:45
2/21/2020
21:21
0.60 SLOT WELLPR CTOP P Vacate fluid from hose, secure
costumer line, RD LRS
0.0 0.0
2/21/2020
21:21
2/21/2020
23:21
2.00 SLOT WELLPR CTOP P Swap out lubricator riser for height
adjustment, obtain RKB's
measurments
0.0 0.0
2/21/2020
23:21
2/22/2020
00:00
0.65 MIRU WHDBOP RURD P Grease and fluid pack surface lines
and BOP stack, perform shell test
4,500 psi
0.0 0.0
2/22/2020
00:00
2/22/2020
00:42
0.70 MIRU WHDBOP BOPE P Test BOP's (250 psi low / 4500 psi
high, annular to 2500 psi), witness
waived by Austin Mcleod of the
AOGCC
Swab 1 and 2 not holding Grease
both, swab#1 pass, geese swab #2 -
pass
0.0 0.0
2/22/2020
00:42
2/22/2020
04:12
3.50 MIRU WHDBOP BOPE P Test 1. Swab 2
Test 2. Blind/Shear, BOP TV2, Charlie
4, 5, 8, &12
Test 3. BOP TV 1, Charlie 3, 7, & 11
Test 4. Manual choke D & Super
choke C
Test 5. Romeo 3, Bleeder 3, Tango 2,
Charlie 2, & 10
Test 6. Charlie 1, 9, Bravo 5, and
Tango 1 – install TIW test joint
Test 7. Lower 2-3/8"” pipe slip rams,
TIW #1, Romeo 1, Bleeder 1
0.0 0.0
Rig: NABORS CDR3-AC
Page 3/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/22/2020
04:12
2/22/2020
07:12
3.00 MIRU WHDBOP BOPE T Test 7. Lower 2-3/8"” pipe slip rams,
TIW #1, Romeo 1, Bleeder 1
Trouble with test, trouble shooting leak
path, pull and reset test joint, attempt
high side still leaking. Attempt to test
3" rams, fail, pull test joint break down,
clean and dope fittings, re torque, start
test
0.0 0.0
2/22/2020
07:12
2/22/2020
08:00
0.80 MIRU WHDBOP BOPE P Test 11. 3 ” pipe slip rams, TIW#2
Test 7. Lower 2-3/8"” pipe slip rams,
TIW #1, Romeo 1, Bleeder 1
Test 8. Annular BOP
0.0 0.0
2/22/2020
08:00
2/22/2020
09:00
1.00 MIRU WHDBOP BOPE T B8 grease , B8 fail 0.0 0.0
2/22/2020
09:00
2/22/2020
11:00
2.00 MIRU WHDBOP BOPE P Test 10. Bravo 7 -9:12-9:43
Test 11. 3 ” pipe slip rams, TIW#2 -
9:47 - 10:06
Test 12. Draw down accumulator-
accumulator pressure 3100 psi,
stabilized pressure 2,350 psi, time to
200 psi increase 19 sec, entire
recovery 45 sec,N2 4 bottle average
1900 psi.
Tested all gas alarms
0.0 0.0
2/22/2020
11:00
2/22/2020
12:48
1.80 MIRU WHDBOP CTOP P Skid cart, test wire, 56 Ohhms &
greater than 2k MeggaOhms, install
CTC and nozzle - install CT counter
on horses head. Working in parralell
to swap out failed B8
0.0 0.0
2/22/2020
12:48
2/22/2020
13:12
0.40 MIRU WHDBOP BOPE T Continue to swap out B8 0.0 0.0
2/22/2020
13:12
2/22/2020
14:00
0.80 MIRU WHDBOP CTOP P Start loading reel with seawater over
the drain to keep moving forward while
continuing to swap out B8 in parralel.
S/D with 10 bbls sea water away
0.0 0.0
2/22/2020
14:00
2/22/2020
15:12
1.20 MIRU WHDBOP BOPE T Complete swap out of B8, re flood
stack.
Test B8 - fail, suspect leaking at MM
valves, grease valves and close blinds
0.0 0.0
2/22/2020
15:12
2/22/2020
15:30
0.30 MIRU WHDBOP BOPE P Test B8 0.0 0.0
2/22/2020
15:30
2/22/2020
19:18
3.80 MIRU WHDBOP PRTS P PT tiger tank line to 2500 psi - good.
Install QTS and fill coil.
0.0 0.0
2/22/2020
19:18
2/22/2020
19:48
0.50 MIRU WHDBOP CTOP P Test inner reel valve and pac-off
(good)
0.0 0.0
2/22/2020
19:48
2/22/2020
20:06
0.30 MIRU WHDBOP CTOP P RD testing equipment, 0.0 0.0
2/22/2020
20:06
2/22/2020
20:24
0.30 MIRU WHDBOP CTOP P Shut down, break off INJH check wire
and install big hole nozzle
0.0 0.0
2/22/2020
20:24
2/22/2020
20:54
0.50 MIRU WHDBOP CTOP P Line up to reverse, bring both mud
pumps online at 2 bpm each 4 bpm,
heard movement 20-30 seconds, shut
down pump, bring pumps online again
up to 4 bpm no movement heard,
brake off INJH and remove nozzle
0.0 0.0
2/22/2020
20:54
2/22/2020
23:06
2.20 MIRU WHDBOP CTOP P RU cutter, issues MU Otis connector,
cut coil to a mule shoe, continue MU
cutter, cut coil, found wire at 8', brake
off cutter, boot wire,
0.0 0.0
Rig: NABORS CDR3-AC
Page 4/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/22/2020
23:06
2/22/2020
23:24
0.30 MIRU WHDBOP CTOP P Re-boot wire, stab INJH, perform
second slack attempt up to 4 bpm
4,931 psi, no movement observed,
unstab INJH,
0.0 0.0
2/22/2020
23:24
2/23/2020
00:00
0.61 MIRU WHDBOP CTOP P MU CTC 0.0 0.0
2/23/2020
00:00
2/23/2020
00:30
0.50 MIRU WHDBOP CTOP P Continue MU CTC, pull test to 35 k 0.0 0.0
2/23/2020
00:30
2/23/2020
01:42
1.20 MIRU WHDBOP CTOP P Re-head BHI UQ, and test eline
>2000/58.6 megOhms
0.0 0.0
2/23/2020
01:42
2/23/2020
02:18
0.60 MIRU WHDBOP CTOP P PT BHI UQ to 4,000 psi. leak at pull
plate connection, shut down re-torque,
PT 4000 psi (good)
0.0 0.0
2/23/2020
02:18
2/23/2020
02:48
0.50 MIRU WHDBOP CTOP P MU Nozzle, pump 1 coil volume
forward, while pre-loading PDL
0.0 0.0
2/23/2020
02:48
2/23/2020
03:30
0.70 MIRU WHDBOP CTOP P Finish up pre-loading PDL, load BOT
4-1/2" MB XL WS
0.0 0.0
2/23/2020
03:30
2/23/2020
06:36
3.10 PROD1 RPEQPT PULD P PD, WS setting assembly, issue with
PDL, mechanic call to increase
hydraulic pressure in order to lift 3"
tool string. Continue to PD BHA #1.
Space out low, double ball valves
buried on first attempt. Complete PD.
0.0 82.3
2/23/2020
06:36
2/23/2020
07:00
0.40 PROD1 RPEQPT TRIP P RIH, large WOB increase, Park coil,
PU, Park, WOB moving with pressure,
not true WOB.
Pumping seawater taking returns to
the tiger tank.
82.3 112.0
2/23/2020
07:00
2/23/2020
07:42
0.70 PROD1 RPEQPT CTOP P Park @ 1500' and adjust CT
gooseneck alignment and first roller
PU, RIH, PU, RIH
112.0 1,622.0
2/23/2020
07:42
2/23/2020
09:54
2.20 PROD1 RPEQPT TRIP P Cntinue to RIH 1,622.0 7,873.0
2/23/2020
09:54
2/23/2020
10:12
0.30 PROD1 RPEQPT DLOG P Tie in to the K1 for a -10' correction 7,873.0 7,917.0
2/23/2020
10:12
2/23/2020
11:54
1.70 PROD1 RPEQPT CTOP P RIHa few feet, stripper leaking, park
pipe, increase stripper pressure, still
leaking, close annular, bleed off and
no flow test above annular, PJSM,
replace side door stripper inner
elements - 2-3/8 eroded to 2-5/8" ID
by rusty pipe. PT upper void annular
to stripper - good, open bag,
7,917.0 7,948.0
2/23/2020
11:54
2/23/2020
12:18
0.40 PROD1 RPEQPT TRIP P RIH to 8900' bit depth - drift run 7,948.0 8,900.0
2/23/2020
12:18
2/23/2020
12:36
0.30 PROD1 RPEQPT TRIP P PUH to logging depth - jet whipstock
setting area at 2 bpm.
8,900.0 8,165.0
2/23/2020
12:36
2/23/2020
13:30
0.90 PROD1 RPEQPT DLOG P Log CCL from 8100 to 8830 8,165.0 8,900.0
2/23/2020
13:30
2/23/2020
14:18
0.80 PROD1 RPEQPT TRIP P PUH to 8765.72' bit depth, WS tray
oriented 150 ° ROHS
Confer w engineering, close EDC.
PU Wt 46 k lbs, down weight 23k lbs,
online w pump at 0.5 bpm, shear at
3400 psi, 2820 diff, WOBclimbed to
5.7 k lbs.
***Set TOWS @ 8750' tray oriented
150° ROHS, SD 2 k lbs.
8,900.0 8,765.7
2/23/2020
14:18
2/23/2020
16:00
1.70 PROD1 RPEQPT TRIP P POOH
Park at 7161' to align goose neck,
continue out of hole.
8,765.7 72.1
Rig: NABORS CDR3-AC
**Set TOW S @ 8750' tray oriented
150° ROHS,
Page 5/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/23/2020
16:00
2/23/2020
17:30
1.50 PROD1 RPEQPT PULD P Bump up, space out, PUD BHA #1 72.1 0.0
2/23/2020
17:30
2/23/2020
18:48
1.30 PROD1 RPEQPT PULD P PD BHA #2, window milling asembly,
both mill and reamer 3.80 no go.
0.0 80.5
2/23/2020
18:48
2/23/2020
20:33
1.75 PROD1 RPEQPT TRIP P RIH with Milling Assembly BHA #2 80.5 7,790.0
2/23/2020
20:33
2/23/2020
21:09
0.60 PROD1 RPEQPT DLOG P Log formation (K1) for depth control,
unclear peaks observed, PUH to
7,790', continue logging, plus 36'
7,790.0 7,992.0
2/23/2020
21:09
2/23/2020
21:27
0.30 PROD1 RPEQPT TRIP P Continue IH 7,992.0 8,705.0
2/23/2020
21:27
2/23/2020
21:39
0.20 PROD1 RPEQPT TRIP P Close the EDC, PUW 47 k w/no pump,
continue IH
8,705.0 8,750.0
2/23/2020
21:39
2/23/2020
22:27
0.80 PROD1 RPEQPT TRIP P Dry tag TOWS 8,750', PUH obtain
pump parameters
8,750.0 8,751.4
2/23/2020
22:27
2/24/2020
00:00
1.55 PROD1 WHPST MILL P Mill window, 2.88 bpm at 2666 psi,
WHP=198, BHP=3,817, IA 455,
OA=181
8,751.4 8,752.9
2/24/2020
00:00
2/24/2020
02:00
2.00 PROD1 WHPST MILL P Mill window, 2.88 bpm at 2666 psi,
Diff=430 psi, WHP=198, BHP=3,817,
IA 455, OA=181
8,752.9 8,754.3
2/24/2020
02:00
2/24/2020
04:00
2.00 PROD1 WHPST MILL P Continue milling, 2.88 bpm at 2,842
psi,Diff=606 psi, WHP=119,
BHP=3,825, IA=767, OA=273
8,754.3 8,755.0
2/24/2020
04:00
2/24/2020
06:00
2.00 PROD1 WHPST MILL P Continue milling, 2.88 bpm at 2,705
psi,Diff=486 psi, WHP=120,
BHP=3,830, IA=859, OA=292
** Note: Bleed IA down to 500 psi
8,755.0 8,756.7
2/24/2020
06:00
2/24/2020
07:00
1.00 PROD1 WHPST MILL P Continue milling, 2.88 /2.59 bpm
in /out, CT 2,674 psi, Diff=464 psi,
WHP=178, BHP=3,836, IA=733,
OA=408
** Mill off @ 8757.8'
8,755.0 8,757.8
2/24/2020
07:00
2/24/2020
09:18
2.30 PROD1 WHPST MILL P Continue milling at 1 ft/hr, 2.88 /2.45
bpm in /out, CT 2,661 psi, Diff=402
psi, WHP=176, BHP=3,867 psi.
8,757.8 8,760.3
2/24/2020
09:18
2/24/2020
12:18
3.00 PROD1 WHPST MILL P Continue milling at 2 ft/hr, 2.88 /2.40
bpm in /out, CT 2,660 psi, Diff=415
psi, WHP=166, BHP=3,859 psi. Ct Wt
18.21 k lbs, WOB -86 lbs
8,760.3 8,765.5
2/24/2020
12:18
2/24/2020
12:54
0.60 PROD1 WHPST MILL P Mill ahead @ ~15 ft/hr, 2.88 /2.46
bpm in /out, CT 2,661 psi, Diff=402
psi, WHP=176, BHP=3,867 psi.
8,765.5 8,776.3
2/24/2020
12:54
2/24/2020
15:18
2.40 PROD1 WHPST REAM P TD rat hole @ 8776', PU Wt 48 k lbs, -
geo verified formation on shaker.
Pull above WS. Perform four reaming
passes at 1 fpm holding as milled tool
face on the down passes and on the
up passes as milled, 30 Right of, 30
Left of, and 180 out of as milled tool
face, varying the bottom stop depth to
avoid washing out the pilot hole.
8,776.3 8,776.6
2/24/2020
15:18
2/24/2020
15:30
0.20 PROD1 WHPST REAM P PU Wt 46 k lbs, PUH see -2.1k WOB
tug @ 8765.9'
Continue up hole, attempt to dry drift,
Set down twice @ 8761' BOW
8,776.6 8,745.0
2/24/2020
15:30
2/24/2020
16:48
1.30 PROD1 WHPST REAM P Perform additional 2 up down passes,
seeing WOB spike @ 8760 and 8762,
assume both DSM and string reamer.
Dry drift at 150 and 330 ROHS, S/D
twice at 7061'
8,745.0 8,761.0
Rig: NABORS CDR3-AC
Page 6/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/24/2020
16:48
2/24/2020
19:48
3.00 PROD1 WHPST REAM P Perform reaming passes up at 300,
330, 360 (0), and 150 on the up pass,
as milled on the in pass.
8,761.0 8,740.0
2/24/2020
19:48
2/24/2020
20:06
0.30 PROD1 WHPST REAM P RIH, drift window exit @ 20 fpm, set
down @ 8,763', pick up hole clean,,
attempt again with same results x 2
8,740.0 8,763.0
2/24/2020
20:06
2/24/2020
20:24
0.30 PROD1 WHPST REAM P Ream down at milled TF 150° ROHS 8,763.0 8,767.0
2/24/2020
20:24
2/24/2020
20:36
0.20 PROD1 WHPST TRIP P PUH for tie in 8,767.0 7,710.0
2/24/2020
20:36
2/24/2020
20:54
0.30 PROD1 WHPST DLOG P Log formation (HRZ), +1.5' 7,710.0 7,993.0
2/24/2020
20:54
2/24/2020
21:06
0.20 PROD1 WHPST TRIP P RIH, dry drift window exit, set down
4.7k 8,766', PUH clean 47 k
7,993.0 8,766.0
2/24/2020
21:06
2/24/2020
21:18
0.20 PROD1 WHPST REAM P Continue pushing on it 4.7k DHWOB
dropped off continued pushing in hole
to TD 8,776'
8,766.0 8,776.0
2/24/2020
21:18
2/24/2020
21:30
0.20 PROD1 WHPST REAM P Ream up 1 fpm up to 8,760', turn
around, RBIH, started taking weight at
8,770', continued pushing on it get
weight back and continued IH to TD
8,776'
8,776.0 8,776.0
2/24/2020
21:30
2/24/2020
23:18
1.80 PROD1 WHPST TRIP P POOH 8,776.0 80.5
2/24/2020
23:18
2/25/2020
00:00
0.70 PROD1 WHPST PULD P PUD milling assembly 80.5 0.0
2/25/2020
00:00
2/25/2020
00:30
0.50 PROD1 WHPST PULD P PUD milling assembly 0.0 0.0
2/25/2020
00:30
2/25/2020
00:54
0.40 PROD1 WHPST CTOP P MU nozzle, stab INJH, jet stack 0.0 0.0
2/25/2020
00:54
2/25/2020
02:39
1.75 PROD1 DRILL PULD P PD build section assembly BHA# 3 0.0 82.5
2/25/2020
02:39
2/25/2020
04:19
1.68 PROD1 DRILL TRIP P Tag up, reset counters, RIH 82.5 7,730.0
2/25/2020
04:19
2/25/2020
04:31
0.20 PROD1 DRILL DLOG P log formation for depth control +7.5' 7,730.0 7,802.0
2/25/2020
04:31
2/25/2020
04:43
0.20 PROD1 DRILL TRIP P Continue IH, closed EDC 7,802.0 8,700.0
2/25/2020
04:43
2/25/2020
05:01
0.30 PROD1 DRILL TRIP P RIH throught window, set down 8,766'
4.5k DHWOB
8,700.0 8,776.0
2/25/2020
05:01
2/25/2020
06:01
1.00 PROD1 DRILL DRLG P Bring pump online 2.6 bpm at 2589
psi, Diff=571, WHP=243, BHP=3,888,
IA=247, OA=123
stalls get started
8,776.0 8,792.0
2/25/2020
06:01
2/25/2020
06:25
0.40 PROD1 DRILL TRIP P Jog in open hole while verifying
directionl data.
send 5x5 sweep
8,792.0 8,787.0
2/25/2020
06:25
2/25/2020
07:37
1.20 PROD1 DRILL DRLG P RBIH and drill ahead, Stall @ 8795
PU W 46 k lbs
Restart and drill to stall at 8805', PU
46 k lbs
Restart and drill to stall at 8808', PU
46 k lbs
Restart and drill to stall at 8825', PU
46 k lbs
Restart and drill to stall at 8805', PU
46 k lbs
8,787.0 8,830.0
2/25/2020
07:37
2/25/2020
07:49
0.20 PROD1 DRILL TRIP P PU 46 k lbs, pull bit up into rat hole,
RBIH to drill.
8,830.0 8,830.0
Rig: NABORS CDR3-AC
Page 7/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/25/2020
07:49
2/25/2020
08:19
0.50 PROD1 DRILL DRLG P Drill ahead to 8861', CTC and quick
connector past the window.
8,830.0 8,861.0
2/25/2020
08:19
2/25/2020
08:49
0.50 PROD1 DRILL TRIP P PUH into the rat hole, coil connector
passed window freely. RBIH to drill.
8,861.0 8,861.0
2/25/2020
08:49
2/25/2020
11:31
2.70 PROD1 DRILL DRLG P CT 3134 @ 2.7 / 1.8 bpm in/out. Free
spin diff 864 psi, BHP 3,931 psi
holding 10.1 at the window. CT Wt
18.8 k lbs, WOB 2.9 k lbs, WH 187
psi, IA 434 psi, OA 363 psi. Average
ROP over interval on bottom 135 Ft/hr
8,861.0 9,225.0
2/25/2020
11:31
2/25/2020
12:01
0.50 PROD1 DRILL TRIP P PU Wt 47 k lbs, PUH, get clean fluid
above us, park, open edc, continue up
hole pumping 2.9 bpm
9,225.0 7,880.0
2/25/2020
12:01
2/25/2020
12:25
0.40 PROD1 DRILL DLOG P Tie int othe K1 for a -5.5' correction
Pull up hole and tie HRZ into K1 for
Geo
9,225.0 7,791.0
2/25/2020
12:25
2/25/2020
13:55
1.50 PROD1 DRILL TRIP P POOH, jog tubing @ 500'. Tag up 7,791.0 82.5
2/25/2020
13:55
2/25/2020
14:49
0.90 PROD1 DRILL PULD P PUD BHA #3. 82.5 0.0
2/25/2020
14:49
2/25/2020
17:13
2.40 PROD1 DRILL PULD P PD BHA #4. Rib steer 3.80" go, 3.79"
no go. Unable to PD in normal
manner with no go ring in stack. Load
lower section, Bit, RSM and DGS in
stack hung off false bowl. Added no
go ring, made up upper section to
lower and continued PD.
0.0 78.4
2/25/2020
17:13
2/25/2020
18:55
1.70 PROD1 DRILL TRIP P RIH to 500', shut EDC, shallow test
motor good. Continue in hole.
78.4 7,735.0
2/25/2020
18:55
2/25/2020
19:07
0.20 PROD1 DRILL DLOG P Tie into the K1 for a -5.5' correction. 7,735.0 7,781.0
2/25/2020
19:07
2/25/2020
19:37
0.50 PROD1 DRILL TRIP P Continue to RIH, WOB spike to 2.9 k
lbs @ 8770.9'
Continue to RIH
7,781.0 9,225.0
2/25/2020
19:37
2/25/2020
20:25
0.80 PROD1 DRILL DRLG P CT 2719 psi @ 2.77 / 2.47 bpm
in /out. Free spin diff 593 psi, BHP
3930 psi, WH 259 psi, IA 307 psi, OA
202 psi, OBD CT 14.4 k lbs, WOB
2.89 k lbs.
Gas cut returns export returns outside.
Average ROP over interval on bottom
148 Ft/hr
9,225.0 9,344.0
2/25/2020
20:25
2/25/2020
21:01
0.60 PROD1 DRILL WPRT T PU off bottom to circulate out gas, 48
k lbs.
Jog hole while exproting returns, MM
plugged off, by passed micro motion
and blew down. Run back in hole to
drill
9,344.0 9,344.0
2/25/2020
21:01
2/25/2020
21:25
0.40 PROD1 DRILL DRLG P CT 2692 psi, @ 2.76 / 2.11 bpm
in /out, free spin diff 451 psi, CT Wt
12.9 k WOB 2.5 k lbs
9,344.0 9,406.0
2/25/2020
21:25
2/25/2020
22:43
1.30 PROD1 DRILL DRLG T PU Wt 49 k lbs
Continue to retun gas cut mud,
increase target to 10.2 ppgat the
window
Increase BHP from 3972 psi to 3980
psi, WEllhead from 258 to 278 psi.
Returns fell from 2.09 bpm to 1.88
bpm
PU to window, clean up returns, RBIH
9,406.0 9,406.0
2/25/2020
22:43
2/25/2020
23:43
1.00 PROD1 DRILL DRLG P CT 2,705 psi, 2.77 / 2.05 bpm in/out,
free spin diff 439 psi, WH 302 psi, IA
320 psi, OA 264 psi. CT 14.2 k lbs,
WOB 3.1 k lbs
9,406.0 9,567.0
Rig: NABORS CDR3-AC
Page 8/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/25/2020
23:43
2/26/2020
00:00
0.27 PROD1 DRILL WPRT T PU off bottom to circulate out gas, 48
k lbs.
Jog hole while exproting returns, MM
plugged off, by passed micro motion
and blew down. Run back in hole to
drill
9,567.0 9,519.0
2/26/2020
00:00
2/26/2020
01:06
1.10 PROD1 DRILL WPRT T Continue from bottom to circulate out
gas, 48 k lbs.
Jog hole while exproting returns. Run
back in hole to drill
9,519.0 9,354.0
2/26/2020
01:06
2/26/2020
01:24
0.30 PROD1 DRILL DRLG P BOBD, 2.77 bpm at 2,986 psi,
Diff=420, WHP=343, BHP=4026,
IA=44, OA=131
9,354.0 9,354.0
2/26/2020
01:24
2/26/2020
02:06
0.70 PROD1 DRILL WPRT T PUH, to clear well of gas cut returns 9,354.0 9,306.0
2/26/2020
02:06
2/26/2020
02:48
0.70 PROD1 DRILL TRIP T Pull to cased hole, pulled tight @
8,780', RBIH, turn around and
continue pulling above window clean,
close choke. consult with town team,
order SW for killing well.
9,306.0 8,607.0
2/26/2020
02:48
2/26/2020
08:48
6.00 PROD1 DRILL CIRC T Recip pipe waiting on SW, cordinate to
get SW loaded onto vac truck. phone
wells support for additional truck
support, 1 AES truck on location
loading SW, other truck is delayed
wtih LRS on pump job, will be
released shortly. returns truck on way
back to Alpine.
8,607.0 8,607.0
2/26/2020
08:48
2/26/2020
16:00
7.20 PROD1 DRILL CIRC T Continue recip pipe waiting on SW.
Bring KCl/SW up to 3%, mud plant
building Duo-vis
8,607.0 8,607.0
2/26/2020
16:00
2/26/2020
18:00
2.00 PROD1 DRILL CIRC T RIH to 8,700', Bring pump on line work
rate up to 9.0 bpm. Pumped 930 BBls
8,607.0 8,700.0
2/26/2020
18:00
2/26/2020
20:30
2.50 PROD1 DRILL OTHR T Shut down pump, Monitor pressures,
Annular pressure 4041PSI. Reload
pits for drilling ops
8,700.0 8,700.0
2/26/2020
20:30
2/26/2020
20:36
0.10 PROD1 DRILL TRIP P Pits loaded with drilling fluid, RIH to
drill
8,700.0 8,789.0
2/26/2020
20:36
2/26/2020
20:42
0.10 PROD1 DRILL DLOG P Log RA for +1.5' 8,789.0 8,800.0
2/26/2020
20:42
2/26/2020
21:00
0.30 PROD1 DRILL TRIP P Continue trip in to drill. Clean pass
through window
8,800.0 9,581.0
2/26/2020
21:00
2/26/2020
21:42
0.70 PROD1 DRILL DRLG P 9581', Drill, 2.78 BPM @ 4079 PSI
FS, BHP=4087, RIW=16.4.
DHWOB=2.2K. Drilling with Seawater/
3%KCL
9,581.0 9,691.0
2/26/2020
21:42
2/26/2020
21:48
0.10 PROD1 DRILL WPRT P Pick up to check parameters,
PUW=52K
9,691.0 9,691.0
2/26/2020
21:48
2/26/2020
22:48
1.00 PROD1 DRILL DRLG P 9691', Drill 2.77 BPM @ 3716 PSI FS,
BHP=4102
9,691.0 9,805.0
2/26/2020
22:48
2/26/2020
22:54
0.10 PROD1 DRILL WPRT P BHA Wiper, PUW=52K 9,805.0 9,805.0
2/26/2020
22:54
2/26/2020
23:42
0.80 PROD1 DRILL DRLG P 9805', Drill, 2.76 BPM @ 4100 PSI
FS, BHP=4110
9,805.0 9,885.0
2/26/2020
23:42
2/26/2020
23:48
0.10 PROD1 DRILL WPRT P BHA wiper, reshoot survey due to high
vibration, PUW=52K
9,885.0 9,885.0
2/26/2020
23:48
2/27/2020
00:00
0.20 PROD1 DRILL DRLG P 9885', Drill, 2.81 BPM @ 3153 PSI
FS, BHP=4129
9,885.0 9,904.0
2/27/2020
00:00
2/27/2020
00:06
0.10 PROD1 DRILL DRLG P 9904', Drilling, 2.82 BPM @ 2551 PSI
FS, BHP=4137
9,904.0 9,915.0
Rig: NABORS CDR3-AC
Page 9/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/27/2020
00:06
2/27/2020
00:12
0.10 PROD1 DRILL WPRT P 9915, PUH to shoot survey. High
vibration drilling on bottom interfering
with survey data, PUW=55K. Start
pumping Duo vis @ 9915. Choke
closed, WHP=720
9,915.0 9,915.0
2/27/2020
00:12
2/27/2020
00:36
0.40 PROD1 DRILL DRLG P 9915', Drill, 2.81 BPM @ 2550 PSI
FS. BHP=4130
9,915.0 9,981.0
2/27/2020
00:36
2/27/2020
01:06
0.50 PROD1 DRILL WPRT P 9981', Wiper trip to bottom of build
9280', PUW=55K
9,981.0 9,981.0
2/27/2020
01:06
2/27/2020
02:42
1.60 PROD1 DRILL DRLG P 9981', Drill, 2.78 BPM @ 2970 PSI
FS. BHP=4155, RIW-10.5K., DHWOB-
2.8K
9,981.0 10,173.0
2/27/2020
02:42
2/27/2020
02:48
0.10 PROD1 DRILL WPRT P 10,173', ick up and restart, PUW=49K 10,173.0 10,173.0
2/27/2020
02:48
2/27/2020
04:18
1.50 PROD1 DRILL DRLG P 10173', Drill, 2.78 BPM @ 3109 PSI
FS, BHP=4176
10,173.0 10,380.0
2/27/2020
04:18
2/27/2020
04:39
0.35 PROD1 DRILL WPRT P Wiper trip to end of build, ~ 9230',
PUW=51K
10,380.0 9,230.0
2/27/2020
04:39
2/27/2020
05:00
0.35 PROD1 DRILL WPRT P Wiper back in hole, RIW 7 k 9,230.0 10,380.0
2/27/2020
05:00
2/27/2020
08:45
3.75 PROD1 DRILL DRLG P BOBD, 2.78 bpm at 3,321 psi,
Diff=478 psi, WHP=884, BHP=4,233,
IA=0, OA=76
10,380.0 10,735.0
2/27/2020
08:45
2/27/2020
09:39
0.90 PROD1 DRILL WPRT P Wiper up hole PUW 62 k, clean pass
through window exit
10,735.0 7,862.0
2/27/2020
09:39
2/27/2020
09:51
0.20 PROD1 DRILL DLOG P Log formation for depth control, no
correction
7,862.0 7,905.0
2/27/2020
09:51
2/27/2020
10:45
0.90 PROD1 DRILL WPRT P Wiper back in hole, RIW 17 k, clean
through window exit
7,905.0 10,735.0
2/27/2020
10:45
2/27/2020
12:45
2.00 PROD1 DRILL DRLG P BOBD, 2.8 bpm at 3,315 psi, Diff=456
psi, WHP=724, BHP=4,248, IA=4,
OA=84, PU BHA wiper from 10,725',
PUW=49 k
10,735.0 10,969.0
2/27/2020
12:45
2/27/2020
14:30
1.75 PROD1 DRILL DRLG P OBD, 2.8 bpm at 4,004 psi, Diff=1,165
psi, WHP=791, BHP=4,303, IA=4,
OA=84, PU BHA wiper from 10,894' &
10,974' PUW=49 k
10,696.0 11,135.0
2/27/2020
14:30
2/27/2020
14:48
0.30 PROD1 DRILL WPRT P Wiper up hole PUW 49 k 11,135.0 10,135.0
2/27/2020
14:48
2/27/2020
15:12
0.40 PROD1 DRILL WPRT P Wiper back in hole, RIW 15 k 10,135.0 11,135.0
2/27/2020
15:12
2/27/2020
17:12
2.00 PROD1 DRILL DRLG P BOBD, 2.98 bpm at 3,585 psi,
Diff=508 psi, WHP=769, BHP=4,300,
IA=6, OA=92
11,135.0 11,315.0
2/27/2020
17:12
2/27/2020
17:24
0.20 PROD1 DRILL WPRT P Stall, Pick up and restart, PUW=50K 11,315.0 11,315.0
2/27/2020
17:24
2/27/2020
18:30
1.10 PROD1 DRILL DRLG P 11315', Drill, 3 BPM @ 3618 PSI FS,
BHP=4320
11,315.0 11,447.0
2/27/2020
18:30
2/27/2020
18:36
0.10 PROD1 DRILL WPRT P 11447, Pick up - restart drilling,
PUW=50K
11,447.0 11,447.0
2/27/2020
18:36
2/27/2020
20:06
1.50 PROD1 DRILL DRLG P 11447', Drill, 3 BPM @ 3600 PSI FS,
BHP=4333, RIW=4.1K, DHWOB=2K
11,447.0 11,585.0
2/27/2020
20:06
2/27/2020
20:48
0.70 PROD1 DRILL WPRT P 11585', Pull 1000' wiper trip.
PUW=51K
11,585.0 11,585.0
2/27/2020
20:48
2/27/2020
21:42
0.90 PROD1 DRILL DRLG P 11585', Drill, 3 BPM @ 2989 PSI FS,
BHP=4346
11,585.0 11,674.0
2/27/2020
21:42
2/27/2020
21:54
0.20 PROD1 DRILL WPRT P 11674, BHA wiper, Reshoot survey,
PUW=49K
11,674.0 11,674.0
2/27/2020
21:54
2/27/2020
23:54
2.00 PROD1 DRILL DRLG P 11674', Drill, 3 BPM @ 3572 PSI FS,
BHP=4358
11,674.0 11,880.0
Rig: NABORS CDR3-AC
Page 10/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/27/2020
23:54
2/28/2020
00:00
0.10 PROD1 DRILL WPRT P 11180', Pull wiper trip to window with
tie in
11,880.0 11,880.0
2/28/2020
00:00
2/28/2020
00:48
0.80 PROD1 DRILL WPRT P On wiper trip to window with tie in 11,880.0 8,760.0
2/28/2020
00:48
2/28/2020
00:54
0.10 PROD1 DRILL DLOG P Log RA for +10.5' 8,760.0 8,780.0
2/28/2020
00:54
2/28/2020
01:54
1.00 PROD1 DRILL WPRT P Continue wiper trip in hole 8,780.0 11,880.0
2/28/2020
01:54
2/28/2020
02:36
0.70 PROD1 DRILL DRLG P 11880', Drill. 3 BPM @ 2909 PSi FS,
BHP=4363. Trying to get back to 90°
inc. At 11905 reduce pump rate and
increase WOB. Unable to build
inclination
11,880.0 11,930.0
2/28/2020
02:36
2/28/2020
03:06
0.50 PROD1 DRILL WPRT P Pull off bottom, Consult town. Trip for
bent motor / orienter BHA.Pump
sweeps
11,930.0 11,850.0
2/28/2020
03:06
2/28/2020
06:06
3.00 PROD1 DRILL TRIP P POOH for BHA. AVG DLS for ribsteer
in L1 @ 4.25°. Open EDC @ 8736'
11,850.0 78.3
2/28/2020
06:06
2/28/2020
07:36
1.50 PROD1 DRILL PULD P Tag up at surface, spaceout, PUD
Lateral Drilling Assembly BHA #4
78.3 0.0
2/28/2020
07:36
2/28/2020
07:54
0.30 PROD1 DRILL CTOP P Perform Function test 0.0 0.0
2/28/2020
07:54
2/28/2020
09:30
1.60 PROD1 DRILL PULD P PU/PD conventional lateral drilling
assembly BHA #5,
0.0 86.7
2/28/2020
09:30
2/28/2020
11:00
1.50 PROD1 DRILL TRIP P RIH pumping down the back side with
drilling fluid
86.7 7,750.0
2/28/2020
11:00
2/28/2020
11:12
0.20 PROD1 DRILL DLOG P Log formation for depth control, - 10.0' 7,750.0 7,809.0
2/28/2020
11:12
2/28/2020
12:30
1.30 PROD1 DRILL TRIP P Continue IH 7,809.0 11,930.0
2/28/2020
12:30
2/28/2020
14:30
2.00 PROD1 DRILL DRLG P BOBD, 2.98 bpm at 4,382 psi,
Diff=1,375 psi, WHP=707,
BHP=4,283, IA=3, OA=81
11,930.0 12,132.0
2/28/2020
14:30
2/28/2020
18:12
3.70 PROD1 DRILL DRLG P OBD, 2.98 bpm at 4,382 psi,
Diff=1,375 psi, WHP=707,
BHP=4,283, IA=3, OA=81
12,132.0 12,330.0
2/28/2020
18:12
2/28/2020
19:00
0.80 PROD1 DRILL WPRT P Wiper to 11480, PUW=52K, Reshoot
survey, Check drilling parameters
12,330.0 12,330.0
2/28/2020
19:00
2/28/2020
20:06
1.10 PROD1 DRILL DRLG P 12330', Drill, 2.88 BPM @ 4177 PSI
FS, BHP=4387, High vibrations 3-5's
12,330.0 12,440.0
2/28/2020
20:06
2/28/2020
21:48
1.70 PROD1 DRILL WPRT P Drilled into higher pressure zone,
Annular from 4666 to 5697 PSI. WHP
from 830 to 1370 PSI. Pull wiper to
window
12,440.0 8,730.0
2/28/2020
21:48
2/28/2020
22:06
0.30 PROD1 DRILL PRTS P Perform 15 min static pressure survey 8,730.0 8,730.0
2/28/2020
22:06
2/28/2020
22:12
0.10 PROD1 DRILL WPRT P Continue wiper trip back to bottom to
drill. Call Alpine oil board to reduce
CD5-25 injection from 11K BPD @
2800 PSI injection pressure to 1K
BPD @ 2300 PSI injection pressure
8,730.0 8,800.0
2/28/2020
22:12
2/28/2020
22:18
0.10 PROD1 DRILL DLOG P Log RA marker for +4' correction 8,800.0 8,808.0
2/28/2020
22:18
2/28/2020
23:30
1.20 PROD1 DRILL WPRT P Continue wiper to bottom 8,808.0 12,400.0
2/28/2020
23:30
2/29/2020
00:00
0.50 PROD1 DRILL DRLG P 12,400' Drill, 2.8 BPM @ 3531 PSI
FS, BHP=4517
12,400.0 12,445.0
2/29/2020
00:00
2/29/2020
01:06
1.10 PROD1 DRILL DRLG P 12445Drill, 2.8 BPM @ 3531 PSI FS,
BHP=4634
12,445.0 12,510.0
2/29/2020
01:06
2/29/2020
01:12
0.10 PROD1 DRILL WPRT P 12510 P/U to reshoot survey,
PUW=58K
12,510.0 12,510.0
Rig: NABORS CDR3-AC
Page 11/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
2/29/2020
01:12
2/29/2020
02:48
1.60 PROD1 DRILL DRLG P 12510', Drill, 2.7 BPM @ 3215 PSI
FS. BHP=4625. Reduce pump rate
due to high vibration
12,510.0 12,607.0
2/29/2020
02:48
2/29/2020
03:00
0.20 PROD1 DRILL WPRT P Pull 100' wiper, PUW=58K 12,607.0 12,607.0
2/29/2020
03:00
2/29/2020
03:48
0.80 PROD1 DRILL DRLG P 12607', Drill, 2.5 BPM @ 3703 PSi FS,
BHP=4642
12,607.0 12,655.0
2/29/2020
03:48
2/29/2020
03:54
0.10 PROD1 DRILL WPRT P 12655', BHA wiper, PUW=59K,
Reshoot surveys
12,655.0 12,655.0
2/29/2020
03:54
2/29/2020
04:24
0.50 PROD1 DRILL DRLG P 12655',Drill, 2.59 BPM @ 3703 PSI
FS, BHP=4638. Still getting high
vibration
12,655.0 12,687.0
2/29/2020
04:24
2/29/2020
04:30
0.10 PROD1 DRILL DRLG P 12687, Encountered another high
pressure area, Annular @ 4643 to
5713 PSI. WHP from 1110 PSI to 1444
12,687.0 12,687.0
2/29/2020
04:30
2/29/2020
04:54
0.40 PROD1 DRILL WPRT P Pull 800' wiper trip. PUW=46K, Unable
to get turned around @ 11,800.
Continue wiper trip to window
12,687.0 11,800.0
2/29/2020
04:54
2/29/2020
06:00
1.10 PROD1 DRILL WPRT P Attempt to turnaround unsuccessful,
continue trip to the window
11,800.0 8,700.0
2/29/2020
06:00
2/29/2020
06:24
0.40 PROD1 DRILL TRIP P Perform static pressure survey above
window 12.9 ppg/5,018 psi/1,657psi,
discuss plan forward with town team.
8,700.0 8,700.0
2/29/2020
06:24
2/29/2020
09:24
3.00 PROD1 DRILL TRIP P POOH, arrange fluids in the pits to
pump 11.8 ppg down the backside.
8,700.0 86.7
2/29/2020
09:24
2/29/2020
11:00
1.60 PROD1 DRILL PULD P At surface, spaceout, PUD drilling
assembly BHA #5
86.7 0.0
2/29/2020
11:00
2/29/2020
11:54
0.90 PROD1 DRILL CIRC P MU otis cap, bullhead 11.8 ppg
completion fluid down back side. Load
NS OH Anchored billet into rig
pipeshed.
Note:Initial pressures WHP 1738 psi
final WHP 506 psi.
0.0 0.0
2/29/2020
11:54
2/29/2020
13:24
1.50 PROD2 STK PULD P PU/PD OH Anchored Billet setting
assembly BHA #6
0.0 79.8
2/29/2020
13:24
2/29/2020
15:12
1.80 PROD2 STK TRIP P RIH 79.8 7,730.0
2/29/2020
15:12
2/29/2020
15:30
0.30 PROD2 STK DLOG P Log formation HRZ w/-9.5' 7,730.0 7,816.0
2/29/2020
15:30
2/29/2020
16:06
0.60 PROD2 STK TRIP P Continue IH, PUW 38 k 7,816.0 9,363.0
2/29/2020
16:06
2/29/2020
16:12
0.10 PROD2 STK OTHR P At set depth, TOB @ 9350, Bring
pumps online, See tool shift @ 4920
PSI, Set down 1.5K on billet
9,363.0 9,363.0
2/29/2020
16:12
2/29/2020
18:12
2.00 PROD2 STK TRIP P POOH after setting billet, Oen EDC @
8700', Continue out
9,363.0 68.0
2/29/2020
18:12
2/29/2020
19:54
1.70 PROD2 STK PULD P PJSM, PUD BHA # 6 N.S. billet
running tools
68.0 0.0
2/29/2020
19:54
2/29/2020
21:36
1.70 PROD2 STK PULD P PJSM, PD BHA # 7 L1-01 kick off /
drilling BHA W 1° AKO motor, Agitator,
and HYC bit, Make up to coiltral to coil
and surface test tool, Check packoffs.
Tag up and set counters
0.0 86.6
2/29/2020
21:36
2/29/2020
23:18
1.70 PROD2 STK TRIP P RIH BHA #7, Shallow test agitator @
500' 2.8 BPM @ 4800. 1450 Diff
86.6 7,750.0
2/29/2020
23:18
2/29/2020
23:30
0.20 PROD2 STK DLOG P 7750 Tie into HRZ for -10' correction,
PUW=40K
7,750.0 7,789.0
2/29/2020
23:30
3/1/2020
00:00
0.50 PROD2 STK TRIP P 7789', Continue in hole, Clean pass
through window
8771' Midnight depth
7,789.0 8,771.0
Rig: NABORS CDR3-AC
Page 12/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/1/2020
00:00
3/1/2020
00:06
0.10 PROD2 STK TRIP P Continue in hole, Dry tag TOB @ 9351 8,771.0 9,351.0
3/1/2020
00:06
3/1/2020
01:00
0.90 PROD2 STK MILL P PUH, Bring on pumps 2.75 BPM @
5136 PSI FS. NHP=5158. Call TOB @
9349.63' oriented to HS.
9,351.0 9,350.6
3/1/2020
01:00
3/1/2020
01:30
0.50 PROD2 STK MILL P Go to 2 FPH 9,350.6 9,351.6
3/1/2020
01:30
3/1/2020
01:48
0.30 PROD2 STK MILL P Go to 3 FPH 9,351.6 9,352.6
3/1/2020
01:48
3/1/2020
02:30
0.70 PROD2 DRILL DRLG P 9352.6', Drill ahead, 2.76 BPM @
5136 PSI FS
9,352.6 9,395.0
3/1/2020
02:30
3/1/2020
02:36
0.10 PROD2 DRILL WPRT P Wiper trip to dry drift billet area,
PUW=43K. Clean trip past billet
9,395.0 9,395.0
3/1/2020
02:36
3/1/2020
05:18
2.70 PROD2 DRILL DRLG P 9395', Drill ahead, 2.76 BPM @ 4974
PSI FS, BHP=5207, RIW=11.1K,
DHWOB=4.4K, WHP=1468
9,395.0 9,525.0
3/1/2020
05:18
3/1/2020
05:30
0.20 PROD2 DRILL WPRT P BHA wiper PUW 71 k, RBIH 9,442.0 9,525.0
3/1/2020
05:30
3/1/2020
05:42
0.20 PROD2 DRILL DRLG P BOBD, 2.8 bpm at 5,132 psi, Off
bottom diff=1,340 psi, WHP=1,479,
BHP=5,142, IA=10, OA=92
9,525.0 9,573.0
3/1/2020
05:42
3/1/2020
06:42
1.00 PROD2 DRILL DRLG T Loss of DHWOB, detained pulling 93
k, work pipe x 5 pumping 0.7 bpm,
unable to move pipe, attempt to bleed
WHP 1,439 psi to 1,243 psi, work
pipe, still detained, pull in tention 93 k,
bring pump online 2 bpm, pull into
tention, pipe moving freely. contnue
pulling to the window
9,573.0 7,750.0
3/1/2020
06:42
3/1/2020
07:00
0.30 PROD2 DRILL DLOG T Log HRZ + 9.0', arrange fluids in pits 7,750.0 7,803.0
3/1/2020
07:00
3/1/2020
07:18
0.30 PROD2 DRILL TRIP T RBIH, 7,803.0 8,651.0
3/1/2020
07:18
3/1/2020
07:48
0.50 PROD2 DRILL CIRC T Pull up hole slowly, hesitating for fluid
to be moved.
8,651.0 8,700.0
3/1/2020
07:48
3/1/2020
08:12
0.40 PROD2 DRILL CIRC T Line up down the backside, bullhead
90 bbl of 11.8 ppg
8,700.0 8,700.0
3/1/2020
08:12
3/1/2020
08:36
0.40 PROD2 DRILL TRIP T RBIH 8,700.0 9,573.0
3/1/2020
08:36
3/1/2020
09:00
0.40 PROD2 DRILL DRLG P BOBD, 2.77 bpm at 5,083 psi, Off
bottom diff=1,341 psi, WHP=587,
BHP=5,226, IA=6, OA=91
9,573.0 9,586.0
3/1/2020
09:00
3/1/2020
09:12
0.20 PROD2 DRILL WPRT P Wiper up hole slowly allowing pump
pressure to drop back down
9,586.0 9,500.0
3/1/2020
09:12
3/1/2020
09:24
0.20 PROD2 DRILL WPRT P Wiper back in hole, RIW 12 k 9,500.0 9,586.0
3/1/2020
09:24
3/1/2020
11:39
2.25 PROD2 DRILL DRLG P BOBD, 2.77 bpm at 5,083 psi, Off
bottom diff=1,341 psi, WHP=587,
BHP=5,226, IA=6, OA=91
9,586.0 9,682.0
3/1/2020
11:39
3/1/2020
11:48
0.15 PROD2 DRILL WPRT P BHA, wiper PUW 63 k, RIW 12 k 9,682.0 9,682.0
3/1/2020
11:48
3/1/2020
12:24
0.60 PROD2 DRILL DRLG P BOBD, 2.77 bpm at 5,083 psi, Off
bottom diff=1,341 psi, WHP=587,
BHP=5,226, IA=6, OA=91
9,682.0 9,690.0
3/1/2020
12:24
3/1/2020
12:42
0.30 PROD2 DRILL WPRT P Pull wiper up hole to 9,400', PUW 62
k, wiper back in hole RIW
9,690.0 9,690.0
3/1/2020
12:42
3/1/2020
14:42
2.00 PROD2 DRILL DRLG P OBD, 2.77 bpm at 5,523 psi, On
bottom diff=1,532 psi, WHP=631,
BHP=5,214, IA=9, OA=101
9,690.0 9,857.0
3/1/2020
14:42
3/1/2020
17:06
2.40 PROD2 DRILL DRLG P OBD, 2.77 bpm at 5,449 psi, On
bottom diff=1,253 psi, WHP=631,
BHP=5,214, IA=9, OA=101
9,857.0 10,096.0
Rig: NABORS CDR3-AC
Page 13/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/1/2020
17:06
3/1/2020
17:30
0.40 PROD2 DRILL WPRT P 10.096', Pull 800' wiper trip.
PUW=46K
10,096.0 10,096.0
3/1/2020
17:30
3/1/2020
19:12
1.70 PROD2 DRILL DRLG P 10,096', Drill, 2.8 BPM @ 5056 PSI
FS, BHP=5214
10,096.0 10,230.0
3/1/2020
19:12
3/1/2020
19:24
0.20 PROD2 DRILL WPRT P 10,230', BHA wiper, PUW=48K.
Reshoot surveys
10,230.0 10,230.0
3/1/2020
19:24
3/1/2020
20:36
1.20 PROD2 DRILL DRLG P 10230', Drill, 2.71 BPM @ 4831 PSI
FS, BHP=5228
10,230.0 10,350.0
3/1/2020
20:36
3/1/2020
21:00
0.40 PROD2 DRILL WPRT P 10350', BHA wiper, PUW=46K,
Reshoot surveys. MWD tool not
responding correctly. Troubleshoot
10,350.0 10,350.0
3/1/2020
21:00
3/1/2020
23:00
2.00 PROD2 DRILL TRIP T POOH for unresponsive BHA, Open
EDC @ 8689'
10,350.0 70.0
3/1/2020
23:00
3/2/2020
00:00
1.00 PROD2 DRILL PULD T At surface, Tag up and space out,
PUD BHA # 7
70.0 70.0
3/2/2020
00:00
3/2/2020
00:30
0.50 PROD2 DRILL PULD T PUD BHA #7. Inspect CT for flat
spots, Min thickness .189"
70.0 0.0
3/2/2020
00:30
3/2/2020
01:30
1.00 PROD2 DRILL PULD T PD BHA #8 from pre loaded PDL,
Make up to coil and surface test, Tag
up and space out
0.0 86.0
3/2/2020
01:30
3/2/2020
03:00
1.50 PROD2 DRILL TRIP T RIH BHA #8 with 1° AKO motor and
RR HYC bit. Shallow test agitator @
500'
86.0 7,750.0
3/2/2020
03:00
3/2/2020
03:06
0.10 PROD2 DRILL DLOG T Log HRZ for -10' correction,
PUW=41K
7,750.0 7,786.0
3/2/2020
03:06
3/2/2020
04:00
0.90 PROD2 DRILL TRIP T Continue in well, Clean trip through
window and billet
7,786.0 10,355.0
3/2/2020
04:00
3/2/2020
07:42
3.70 PROD2 DRILL DRLG P 10350', Drill, 2.73 BPM @ 4833 PSI
FS, BHP=5193, RIW=10.5, fighting
weight transfer issues, PUW's 48-72k
10,355.0 10,605.0
3/2/2020
07:42
3/2/2020
08:03
0.35 PROD2 DRILL WPRT P Wiper up hole PUW 65 k to 9,650 10,605.0 9,650.0
3/2/2020
08:03
3/2/2020
08:24
0.35 PROD2 DRILL WPRT P Wiper back in hole, RIW 10 k 9,650.0 10,649.0
3/2/2020
08:24
3/2/2020
10:24
2.00 PROD2 DRILL DRLG P BOBD, 2.73 bpm at 4,746 psi, Diff=
1,130 psi, WHP=1,701, BHP=5,222,
IA=9, OA=96
10,649.0 10,715.0
3/2/2020
10:24
3/2/2020
12:18
1.90 PROD2 DRILL DRLG P OBD, 2.72 bpm at 4,788 psi, Diff=
1,130 psi, WHP=1,701, BHP=5,231,
IA=9, OA=96
10,715.0 10,779.0
3/2/2020
12:18
3/2/2020
12:33
0.25 PROD2 DRILL WPRT P Wiper up hole, PUW 65 k 10,779.0 9,676.0
3/2/2020
12:33
3/2/2020
12:48
0.25 PROD2 DRILL WPRT P Wiper back in hole, RIW 10 k 9,676.0 10,779.0
3/2/2020
12:48
3/2/2020
14:48
2.00 PROD2 DRILL DRLG P BOBD, 2.73 bpm at 4,746 psi, Diff=
1,130 psi, WHP=1,701, BHP=5,222,
IA=9, OA=96
10,779.0 10,905.0
3/2/2020
14:48
3/2/2020
16:48
2.00 PROD2 DRILL DRLG P BOBD, 2.73 bpm at 4,746 psi, Diff=
1,130 psi, WHP=1,701, BHP=5,222,
IA=9, OA=96
10,905.0 10,958.0
3/2/2020
16:48
3/2/2020
17:36
0.80 PROD2 DRILL WPRT P Wiper to window, PUW=62K 10,958.0 7,750.0
3/2/2020
17:36
3/2/2020
17:42
0.10 PROD2 DRILL WPRT P RBIH to log HRZ 7,750.0 7,894.0
3/2/2020
17:42
3/2/2020
18:00
0.30 PROD2 DRILL DLOG P 7894, Log HRZ for +14' Correction 7,894.0 7,808.0
3/2/2020
18:00
3/2/2020
19:24
1.40 PROD2 DRILL WPRT P 7808', Continue wiper to bottom.
Clean through window and past billet
7,808.0 10,958.0
3/2/2020
19:24
3/2/2020
19:48
0.40 PROD2 DRILL DRLG P 10958', Drill, 2.68 BPM @ 4056 PSI
FS, BHP=5251
10,958.0 10,989.0
Rig: NABORS CDR3-AC
Page 14/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/2/2020
19:48
3/2/2020
19:54
0.10 PROD2 DRILL WPRT P 10989, BHA Wiper, PUW=62K, 10,989.0 10,989.0
3/2/2020
19:54
3/2/2020
20:06
0.20 PROD2 DRILL DRLG P 10989', Drill, 2.68 BPM @ 4961 PSI
FS
10,989.0 11,001.0
3/2/2020
20:06
3/2/2020
23:06
3.00 PROD2 DRILL WPRT T BHA wiper, PUW=82K, Reshoot
surveys Set down stuck pipe @
10997'. PUW 89K, Work pipe. Able to
orient freely. Unable to get any
reaction from DHWOB sensor. Pump
5 X 5 sweeps. Go to neutral weight
S/D pump try relaxing. Try lowering
annular pressure. Unable to lower
pressure. Get LVT into pits and prep to
pump
11,001.0 10,997.0
3/2/2020
23:06
3/3/2020
00:00
0.90 PROD2 DRILL WPRT T Pump 14 BBls LVT down CT. Stop at 6
BBls out. Let soak. Work pipe. Park in
compression. Pump 2 BBls out. Let
soak work pipe. Goto neutral weight
pump 2 bbls out of coil. Work pipe
10,997.0 10,997.0
3/3/2020
00:00
3/3/2020
00:18
0.30 PROD2 DRILL WPRT T Pump 42 BBl beaded liner running pill
down CT
10,997.0 10,997.0
3/3/2020
00:18
3/3/2020
00:24
0.10 PROD2 DRILL SFTY T PJSM with LRS to pump crude 10,997.0 10,997.0
3/3/2020
00:24
3/3/2020
02:12
1.80 PROD2 DRILL WPRT T 35 BBl beaded pill out CT. S/D pumps
and let soak in tension. Work pipe,
Pump 5 BBls out in compression. Let
soak. Work pipe. Goto neutral weight.
Pump last of pill out CT Work PIPE
10,997.0 10,997.0
3/3/2020
02:12
3/3/2020
04:18
2.10 PROD2 DRILL WPRT T PT LRS to 5K. Working frozen valve
issues on pump truck
10,997.0 10,997.0
3/3/2020
04:18
3/3/2020
04:30
0.20 PROD2 DRILL WPRT T LRS online down CT w/crude 2.6 BPM
@ 4350 PSI
10,997.0 10,997.0
3/3/2020
04:30
3/3/2020
05:00
0.50 PROD2 DRILL WPRT T 25 BBls away S/D pump LRS truck
over heated
10,997.0 10,997.0
3/3/2020
05:00
3/3/2020
05:36
0.60 PROD2 DRILL WPRT T LRS back online with crude down the
CT
10,997.0 10,997.0
3/3/2020
05:36
3/3/2020
05:42
0.10 PROD2 DRILL WPRT T LRS offline, Pumped 108 BBls crude,
Isolate LRS vac customer line
10,997.0 10,997.0
3/3/2020
05:42
3/3/2020
05:54
0.20 PROD2 DRILL WPRT P Work pipe free 10,997.0 10,997.0
3/3/2020
05:54
3/3/2020
07:00
1.10 DEMOB DRILL WPRT P Pull wiper to window 10,997.0 7,720.0
3/3/2020
07:00
3/3/2020
08:12
1.20 PROD2 DRILL RGRP P Swap out levelwind ram (DS) 7,720.0 7,750.0
3/3/2020
08:12
3/3/2020
08:36
0.40 PROD2 DRILL DLOG P Clean up work area, RIH, Log
formatoin for depth + 9.0 bpm
7,750.0 7,792.0
3/3/2020
08:36
3/3/2020
09:18
0.70 PROD2 DRILL TRIP P RIH to above window, pumping lubed
drilling fluid down back side.
WHP=2,045
7,792.0 8,630.0
3/3/2020
09:18
3/3/2020
10:06
0.80 PROD2 DRILL CIRC P Line up down the backside, pump 150
bbl drilling fluid
8,630.0 8,630.0
3/3/2020
10:06
3/3/2020
12:06
2.00 PROD2 DRILL TRIP P Change of plans, TD called early @
11,001', POOH
8,630.0 82.3
3/3/2020
12:06
3/3/2020
13:06
1.00 PROD2 DRILL CIRC P Continue circulating down backside. 8,630.0
3/3/2020
13:06
3/3/2020
14:36
1.50 PROD2 DRILL PULD P PJSM, PUD/LD/Inspect drilling
assembly BHA #8
** Note: Major wear observed on
ako/motor bend, thorough housing,
upload pictures to s:drive
82.3 0.0
Rig: NABORS CDR3-AC
Page 15/15
CD5-23
Report Printed: 4/5/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/3/2020
14:36
3/3/2020
16:36
2.00 DEMOB WHDBOP CIRC P Clear RF, MU nozzle stab INJH,
bullhead freeze protect (dead crude),
jet stack and surface lines
0.0 0.0
3/3/2020
16:36
3/3/2020
17:06
0.50 DEMOB WHDBOP PULD P Unstab INJH, slide cart back, 0.0 0.0
3/3/2020
17:06
3/4/2020
00:00
6.90 DEMOB WHDBOP CTOP P Blow down rig lines, tiger tank line,
brake off hardline, vacate fluid from
pits, off load returns from tiger tank,
RD high pressure lines in PUTZ.
inspect INJH, load KDTH trucks, RD
transducers in cellar, stage tree cap
and flange,
0.0 0.0
Rig: NABORS CDR3-AC
$ODVND,QFB:16 ! "# $"%&'%"%&%()%)
*++'%$
+,-
+ +./0
1#$$% + 2+
$+,$ &'(-.+/' #0*121+
$ODVND,QFB:16
!" &'( &'()*&+* &'()*&+*2+* !"
+ &'(-.+/' #0*12!
+ &'( +3
+*4+
+3*1'.02
!*1'.0
!4
4
32
5
!53"!6+7,)$3 %#3 "# '1
$+'
$+1+!1+#56% 5!6% 7###3
$'+ &'(##+/+++/++ 518 5.18/.8(715** /88((/.+ $++/++#+/++.+9*:;71/**(
* *9*(;''/( ( 289:;$ 18,: #189:$!1 &'()*&+*3#" (<*<'+'+ * /87 :+/8: .5(*7/+++-+#
$!+1 &'()*&+**/+ !3!)- + ;8,-:8
:5!6% 8
:89:56% 8
:,<+15((7/:.*8+/+++/+++/++(8/
*++'%$
+,-
+ +./0
1#$$% + 2+
$+,$ &'(-.+/' #0*121+&RQRFR3KLOOLSV$ODVND,QFB:16:HVWHUQ1RUWK6ORSH&'$OSLQH:HVW3DG&'&'/&'/2+* !"
+ &'(-.+/' #0*12!
+ &'(;8
:
1,!
8 2:,8
:(<*.<'+'+
$=>&=& ="
8:/. 7'+/:8 &'($*&)?=.+0 &'(2*'<(+<'+*. *'<(+<'+*.,@A%'@!=@, 4=,@A%'@ @,&7.8/8''5*71/8* &'($'&)?,@=,!=0*'<(+<'+*. *'<(*<'+*.,&
?4
)>0
B*+92 ,&
?4
)>?A))%0
B*+92'5*18/1*'5'1+/87 &'($(&)?,&&4&A*<(<'+*: *<(<'+*:,@A%'@!=@, 4=,@A%'@ @,&'5(:7/(1:5 8+/. &'($7&)?,@=,!=0*<(<'+*: *< <'+*:,@A%'@!=@, 4=,@A%'@ @,&:58 ./71:5.*(/7. &'($ &)?,@=,!=0*<*+<'+*: *<*7<'+*:,&
?4
)>0
B*+92 ,&
?4
)>?A))%0
B*+92:5. '/++:5:( /( &'()*,&
0 &'()*2'<' <'+'+ '<' <'+'+,4= 4=,&"":5:8 /7.15((7/:. &'()*,0 &'()*2'<' <'+'+ '<'1<'+'+,4= 4=,&""15( +/++*+51+'/7: &'()*&+*0 &'()*&+*2(<*<'+'+ (<(<'+'+8
:=89:#>89:56% 8
:5!6% 8
:
,-8
:,- 8
:!18:18:- 8:' 896?:
,!!15((7/:. :1/7: *(8/1* .5 +1/+* (5*.*/:1 &*5 '8/+ .57(:/.8 518:511:/77 (7.58 (/.8 8/+7 &(5 +'/ 7 ,4=0.215( +/++ :1/:. *(./: .5 +1/*+ (5*8+/. &*5 * /:*.57(:/: 518:51:./*+ (7.588(/.: 8/.( &(57::/ . ,4=0:2C415(88/1 1+/1: *(1/+: .5 +:/1. (5*7:/+8 &*5 +7/ ..57(:/.' 518:51.7/*1 (7.58.7/.8 1/.. &(57.'/:* ,4=0:215(:(/(1 1*/. *(:/:+ .5 +:/ : (5*( /8. &*571(/.:.57(:/(( 518:518*/ 1 (7.58: /(+ 7/1: &(57 ./7. ,4=0:2157+(/ 8 1'/1' *7+/+: .5 +./.8 (5*'+/(8 &*57:+/8..57(./ * 518:5178/+' (7.581:/+1 :/ 1 &(57(:/8+ ,4=0:2157((/(. 17/(. *7*/88 .5 + /:8 (5+1./'1 &*578*/1+.57( /8* 518:51''/ . (7.5.*8/7+ ./*1 &(57*+/ + ,4=0:2157.*/ * 1 /11 *7(/ ' .5 +'/7' (5+8./*' &*57(:/:'.57('/*. 518:5:1*/1 (7.5.(:/:8 8/7 &(5(.7/' ,4=0:215 +'/(8 1./.7 *77/(( .571:/.( (5+7'/(8 &*57'+/.1.57':/7: 518:5:88/:7 (7.5. 8/(1 8/'7 &(5(77/:' ,4=0:215 ' / ' 1:/.' *78/*1 .571 /7' (5+'(/ ( &*57+./.(.57' /*. 518:5:7./.7 (7.5.81/+. 1/++ &(5(''/88 ,4=0:215 (/87 *++/*8 *78/:: .571+/:* (5+++/(1 &*5(1'/7(.57'+/ 8 518:5:'7/(+ (7.5.:(/1+ /88 &(5'1 /8: ,4=0:215 :+/(+ *+*/7( *7:/(+ .57: /:* '51.:/': &*5(.:/(1.57* / 8 518:5:+*/1' (7.5.1./71 ./+: &(5'.+/** ,4=0:2158*(/78 *+*/7( *7./(. .57.1/'7 '51 +/.. &*5(8*/+1.57+:/11 518:5..7/+. (7.5:*7/'( '/. &(5'(:/(7 ,4=0:21587*/ 8 *++/' *7./+. .57.(/18 '51'./ . &*5(78/* .57+(/.* 518:5. +/ . (7.5:':/.+ 7/(( &(5'**/7' ,4=0:2158.(/87 *++/*+ *77/+* .578:/'1 '51+*/ ( &*5(':/':.5(1:/+7 518:5.'7/*1 (7.5:78/+7 1/7+ &(5*:+/: ,4=0:215.+7/+8 11/*' *7'/(' .578(/'* '5:../ ( &*5(*+/(+.5(1'/18 518:5811/:( (7.5:8(/ ( 8/( &(5* '/*7 ,4=0:2
*++'%$
+,-
+ +./0
1#$$% + 2+
$+,$ &'(-.+/' #0*121+&RQRFR3KLOOLSV$ODVND,QFB:16:HVWHUQ1RUWK6ORSH&'$OSLQH:HVW3DG&'&'/&'/2+* !"
+ &'(-.+/' #0*12!
+ &'(8
:=89:#>89:56% 8
:5!6% 8
:
,-8
:,- 8
:!18:18:- 8:' 896?:
,!!15.(7/': 18/.( *77/'' .57 1/+7 '5: (/ 7 &*5'1'/7*.5(::/.1 518:58. /71 (7.5::+/17 *+/+. &(5*'(/7: ,4=0:215.8(/:+ 18/ * *78/'+ .57 /87 '5:'1/78 &*5'. /8:.5(: /(1 518:58 */+: (7.5:1./*1 8/.+ &(5+1 /*( ,4=0:215.17/+7 1 /+. *71/.( .57 '/ 1 '5:+(/18 &*5' 1/.'.5(:'/(7 518:58' /'8 (7.51*'/8' *'/ &(5+8 /.* ,4=0:215:(*/1+ 17/* * (/:( .5771/ 7 '5..+/.' &*5'7*/::.5(.1/'1 518:5 1*/8. (7.51'1/.1 **/+8 &(5+':/(. ,4=0:215: (/18 1(/:. * 8/'( .577:/++ '5. +/.. &*5'('/ 1.5(../. 518:5 .*/ 7 (7.51(:/8: *+/1( &(5++8/7 ,4=0:215:: /77 1(/+* * 1/'' .5778/** '5.'*/.+ &*5''+/8:.5(. /:8 518:5 7'/'7 (7.51 +/++ 1/:. &'51. /+8 ,4=0:2151*(/. 1'/*: *8(/8( .5777/:( '5817/:1 &*5'**/8:.5(.7/ : 518:5 * /'8 (7.51 :/78 * /:7 &'5178/.1 ,4=0:215177/+: 1*/ + *8 /'( .577(/: '588 /81 &*5'+(/ 7.5(.(/8+ 518:57: /1+ (7.5188/+* /.( &'51*8/ . ,4=0:2151.(/18 1'/(+ *88/:8 .577'/:8 '58(8/.* &*5*18/(7.5(.'/8* 518:57 8/.1 (7.51.'/8( 8/+. &'5::8/:. ,4=0:2*+5++7/** 1'/.( *8:/(: .577*/ 7 '58+./'1 &*5*:1/::.5(.*/'1 518:57'./' (7.51.:/71 /'( &'5: ./+' ,4=0:2*+5+(7/1+ 1(/ . *8 /:. .57(1/: '5 ../(( &*5*:(/+(.5(81/8+ 518:5(1./* (7.51:7/.7 :/ : &'5:'8/ * ,4=0:2*+5+8'/1+ 1(/'' *87/'7 .57(:/*1 '5 +/(' &*5*. /:(.5(8./17 518:5(.+/+* (7.511*/7+ /17 &'5.1:/8. ,4=0:2*+5+:8/'( 1*/ * *8'/8: .57(./'( '5 './1: &*5*81/*1.5(88/1: 518:5(7./ 7 (7.511./ 1 1/1' &'5.. /7* ,4=0:2*+5*'7/87 ::/.* *8*/(' .57(./* '571*/7 &*5* ./('.5(88/1+ 518:5(*+/.: (7:5++:/.' :/*+ &'5.(./+( ,4=0:2*+5* (/*' 1*/'8 *8'/ . .57(./*8 '5787/(: &*5*7:/ +.5(88/1* 518:5':(/ 7 (7:5+*./++ 1/1. &'5.+:/ 8 ,4=0:2*+5*:7/.* ::/8 *8'/(+ .57(./*1 '57(7/'8 &*5*(:/18.5(88/17 518:5' (/'7 (7:5+' /1' :/(* &'58../+* ,4=0:2*+5'*./7+ :1/7' *8(/': .57(./.7 '57+(/+7 &*5*'1/'1.5(8./71 518:5''*/:( (7:5+(7/18 (/:* &'5877/(8 ,4=0:2*+5'7 / 7 :1/.1 *8 /1 .57(./1( '5(. /1* &*5*'*/:(.5(8./8: 518:5*17/ 8 (7:5+7*/:: 1/ : &'58*8/(* ,4=0:2*+5'.7/ ' :1/7' *88/'1 .57(:/*( '5(7./.: &*5**7/::.5(8./:: 518:5*88/(+ (7:5+7:/'8 */.( &'5 :./ + ,4=0:2*+5(+'/'7 :1/ * *8./.: .57(:/(1 '5('+/.. &*5*+:/88.5(8:/*7 518:5*(1/*. (7:5+ (/17 /(: &'5 1/11 ,4=0:2*+5((+/(8 :1/.1 *88/:' .57(:/ 8 '5'1(/(7 &*5*+'/7:.5(8:/(* 518:5***/8' (7:5+ 1/ . (/ 8 &'5 ('/*+ ,4=0:2*+5(8(/:8 :1/88 *8:/*. .57(:/.' '5'8+/8( &*5+1 /''.5(8:/7. 518:5+.:/.: (7:5+88/*8 7/+ &'571:/:1 ,4=0:2*+5(: /*: :1/1 *8./:8 .57(:/.1 '5'(1/.: &*5+1+/.1.5(8:/ 7 518:5+ ./:7 (7:5+.+/*. */11 &'57../.: ,4=0:2*+57''/'* 1+/+( *8./:* .57(:/:+ '5'+(/ : &*5+:'/11.5(8:/ 518:5+'*/ + (7:5+../'7 +/' &'577*/+1 ,4=0:2*+57 (/77 :1/:: *88/. .57(:/:( '5*.(/*' &*5+.8/*'.5(8:/ : 518.511+/1+ (7:5+:(/ + (/7( &'57*+/** ,4=0:2*+57:1/(* :1/ 7 *87/7 .57(1/+* '5*(:/(: &*5+8./'+.5(8:/.8 518.51 /11 (7:5+1*/.' 8/7: &'5(.7/7' ,4=0:2*+5 ''/1: :1/'1 *8(/+* .57(1/( '5*+8/+8 &*5+ ./.8.5(81/*+ 518.51'(/71 (7:5*++/ + 7/(7 &'5(7+/:' ,4=0:2*+5 .(/:: :8/:8 * :/77 .577*/+8 '5+ :/+ &*5+7+/1:.5(.+/:* 518.5:. /*. (7:5**8/(' *+/*8 &'5':1/1. ,4=0:2*+58+(/77 :./1* * ./1* .577'/7* '5+(+/87 &*5+(+/++.5(.'/*8 518.5:7./ 7 (7:5*'8/.7 (/1: &'5'8+/78 ,4=0:2*+58(1/*: :./7 * 8/1* .577(/:8 *511./8. &*5+*8/':.5(.(/8* 518.5:*7/(+ (7:5*(1/:+ (/+: &'5''7/.: ,4=0:2*+588./8: ::/:+ * ./*' .5777/.1 *51.*/7 &*5++ /*8.5(.7/ 7 518.5.:./:8 (7:5* +/(1 7/.1 &'5*18/(7 ,4=0:2
*++'%$
+,-
+ +./0
1#$$% + 2+
$+,$ &'(-.+/' #0*121+&RQRFR3KLOOLSV$ODVND,QFB:16:HVWHUQ1RUWK6ORSH&'$OSLQH:HVW3DG&'&'/&'/2+* !"
+ &'(-.+/' #0*12!
+ &'(8
:=89:#>89:56% 8
:5!6% 8
:
,-8
:,- 8
:!18:18:- 8:' 896?:
,!!*+581'/ : ::/:1 * 8/.1 .577 /'1 *517:/ 7 &11 /7*.5(. /+7 518.5.87/.. (7:5* 1/8. */(. &'5*.*/7: ,4=0:2*+5.' /77 :1/ 7 * /(7 .577 /.7 *51*:/ * &1:'/+:.5(. /71 518.5.(7/7: (7:5*.'/(1 7/:7 &'5*(:/.+ ,4=0:2*+5.8*/(8 :1/ * * 7/++ .5778/+7 *5::8/+7 &188/.'.5(. /.1 518.5.+*/.* (7:5*:./*+ (/.( &'5*+'/17 ,4=0:2*+5.:'/:( :1/1. * (/.( .5778/*7 *5:88/.. &1 ./'8.5(. /:1 518.58:'/' (7:5*18/*. '/7: &'5+:*/ 1 ,4=0:2*+5:*./(7 1'/'* * 7/:8 .577 /7: *5:( /8: &17'/(+.5(. /'( 518.58 +/:. (7:5'*+/ * ./'. &'5+7./'8 ,4=0:2*+5:7'/(+ 1+/78 * (/+1 .5777/1+ *5:*(/'8 &1(*/( .5(.7/8 518.58':/'7 (7:5''*/++ 1/1. &'5+''/7 ,4=0:2*+5:.7/ * :./.+ * 7/+ .577 /7' *5.:7/7( &1*./+*.5(. /*. 518.5 11/*' (7:5'(7/. 1/+. &*511+/7 ,4=0:2*+51+'/7: :8/1+ * :/1. .5778/.( *5. :/:* &1+ /::.5(.8/7: 518.5 .(/'1 (7:5'7 /(. *./:+ &*518'/ . ,4=0:2**5++*/++ :8/1+ * :/1. .57 '/+8 *5888/11 &:.+/ :.5(:*/:* 518.57:+/.: (7:5'.:/:* +/++ &*5:87/'* %4D
Baker Hughes Gf Date:
March 20, 2020
---
Abby Bell
AOGCC
333 West Ph Ave, Suite 100
Anchorage, Alaska 99501
22001s
3222
Letter ®f Transmittal
MAR 2 J 2020
Harvey Finch !" OG V V
Baker Hughes
795 East 94th Avenue
Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
CD5-23L1
CD5-23L1-01
(2) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Harvey Finch
Baker Hughes
Wellplanner
Harvey.Finch(@bakerhughes.com
THE STATE
'ALASKA
GOVERNOR MIKE DUNLEAVY
James Ohlinger
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Re: Colville River Field, Alpine Oil Pool, CRU CD5-23L1-01
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 220-011
Alaska Oil and Gas
Conservation Commission
Surface Location: 420' FNL, 2862' FEL, SEC. 18, T1IN, R4E, UM
Bottomhole Location: 782' FNL, 2026' FWL, SEC. 18, TI IN, R4E, UM
Dear Mr. Ohlinger:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Enclosed is the approved application for the permit to redrill the above referenced service well.
The permit is for a new wellbore segment of existing well Permit No. 217-155, API No. 50-103-20761-
00-00. Production should continue to be reported as a function of the original API number stated
above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by
law from other governmental agencies and does not authorize conducting drilling operations until all
other required permits and approvals have been issued. In addition, the AOGCC reserves the right to
withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an
AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension
of the permit.
Sincerely,
V*r
ce
DATED this tl
jday of January, 2020.
STATE OF ALASKA
AL, .A OIL AND GAS CONSERVATION COM ON
PERMIT TO DRILL
20 AAC 25.005
JAN 2 1 20,20
1 a. Type of Work:
Drill ❑ Lateral
Redrill ❑ Reentry ❑
1b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG Service - Disp ❑
Stratigraphic Test ❑ Development - Oil ❑ Service - Winj ❑ Single Zone E
Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
1 c. Specify if well is proposed for:
Coalbed Gas ❑ Gas Hydrates ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
5. Bond: Blanket R • Single Well ❑
Bond No. 5952180
11. Well Name and Number:
CRU CD5-231_1-01
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
6. Proposed Depth: r Vb
MD: 13,250' - TVD. 7391'
12. Field/Pool(s):
Colville River Unit /
Alpine Oil Pool
4a. Location of Well (Governmental Section):
Surface: 420' FNL, 2862' FEL, Sec. 18, T11 N, R4E, UM
Top of Productive Horizon:
2469' FNL, 520' FWL, Sec. 07, T11N, R4E, UM
Total Depth:
782' FNL, 2026' FWL, Sec. 18, T11N, R4E, UM
7. Property Designation: _ /, _-3
AS ASRC-NPR2, A§J�C-HPTTTASRC-NPR4
8. DNR Approval Number:
932126, 932128, 932669, 932671
13. Approximate Spud Date:
1/29/2020
9. Acres in Propertv:
22522
14. Distance to Nearest Property:
11,150'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
Surface: x- 349116. y- 5965797 • Zone- 4
10. KB Elevation above MSL (ft): 70
GL / BF Elevation above MSL (ft): 33.7
15. Distance to Nearest Well Open
to Same Pool: 1077' (CD5-20L1) '
16. Deviated wells: Kickoff depth: 9,300 feet
Maximum Hole Angle: 102 degrees
17. Maximum Potential Pressures in psig (see 20 AAC 25.035)
Downhole: 4900 • Surface: 4154
18. Casing Program: Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
4-1/4" 2-7/8" 6.5# L-80 ST -L 4510'
8740' 7390' 13,250' 7391' Uncemented Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
27,430' 7330' N/A 27,430' 7330' N/A
Casing Length Size Cement Volume MD TVD
Conductor 82' 20" 10 yds 115' 115'
Surface 2183' 10.75" 288 sx 15.8 ppg Class G 2220' 2179'
Production 8587' 7.625" 242 sx 15.8 ppg Class G 8621' 7444'
Perforation Depth MD (ft): Open Hole 8621'- 27,430' Perforation Depth TVD (ft): Open Hole 7444'- 7330'
Hydraulic Fracture planned? Yes 11 No ❑✓ '
20. Attachments: Property Plat El BOP Sketch Drilling Program
Diverter Sketch g Seabed Report H
Time v. Depth Plot
Drilling Fluid Program
Shallow Hazard Analysis
�✓ 20 AAC 25.050 requirements
21. Verbal Approval: Commission Representative: Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Contact Name: Shane Germann
Authorized Name. James Ohlinger Contact Email: Shane. ermann c0 .com
Authorized Title: Staff CTD Engineer Contact Phone: 907-263-4597
Authorized Signature: Date:
Commission Use Only
Permit to Drill
Number: ^Ull
API Number: 4,1—
150-%U� � 76,/S SC 1—00
Permit Approva
Date: ( �� ftt) I'd
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales:
Other:BaP trst -110 Samples req'd: Yes ❑ Nolo Mud log req'd: Yes ❑ No
Sao �-t
�}6�v�vfCLr /—e-Vlk7f r— Sf jO ZSD U�H2S measures: Yes Q No❑ Directional svy req'd: Yes[ No❑
q14C z S, Spacing xception req'd: Yes ElNo0 Inclination -only svy req'd: Yes No '
af } rC�Ll e-1-110t&,� ill G� 6, f� �� ��� b� Post initial injection MIT req'd: Yes[`] No❑
� y 717D%h ✓ CL /O v1 fhC' �Gt/"a''vd� lat ¢C�/
t APPROVED BY
Approved by: COMMISSIONER THE I ate:
lvb
S mit Form and
Form to 01 Re is 5/2 7 Thi per it is valid for 24 months from the date of appmva r 0 ( hments in Duplicate
sConocoPhillip
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
January 15, 2020
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill two laterals out of the CRU CD5-23
(PTD# 217-155) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin in early February 2020. The objective will be to drill two laterals, CRU
CD5-231_1 and CD5-231_1-01, targeting the Alpine A and C -sand intervals.
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20
AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of
being limited to 500' from the original point.
Attached to permit to drill applications are the following documents:
- Permit to Drill Application Forms (10-401) for CD5-231_1 and CD5-231_1-01
- Detailed Summary of Operations
- Directional Plans for CD5-231_1 and CD5-231_1-01
- Current Wellbore Schematic
- Proposed CTD Schematic
If you have any questions or require additional information, please contact me at 907-263-4597.
Sincerely,
Shane Germann
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Alpine CTD Laterals
C135-231-1 & CD5-231-1-01
Application for Permit to Drill Document
1.
Well Name and Classification......................................................................................................... 2
(Requirements of 20 AAC 25.005(f) and 20 AAC 25.005(b)).................................................................................................................. 2
2.
Location Summary.......................................................................................................................... 2
(Requirements of 20 AAC 25.005(c)(2))................................................................................................................................................. 2
3.
Blowout Prevention Equipment Information................................................................................. 2
(Requirements of 20 AAC 25.005 (c)(3))................................................................................................................................................ 2
4.
Drilling Hazards Information and Reservoir Pressure.................................................................. 2
(Requirements of 20 AAC 25.005 (c)(4))................................................................................................................................................ 2
5.
Procedure for Conducting Formation Integrity tests.................................................................... 2
(Requirements of 20 AAC 25.005(c)(5))................................................................................................................................................. 2
6.
Casing and Cementing Program....................................................................................................3
(Requirements of 20 AAC 25.005(c)(6))................................................................................................................................................. 3
7.
Diverter System Information.......................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(7))................................................................................................................................................. 3
8.
Drilling Fluids Program................................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(8))................................................................................................................................................. 3
9.
Abnormally Pressured Formation Information............................................................................. 4
(Requirements of 20 AAC 25.005(c)(9))................................................................................................................................................. 4
10.
Seismic Analysis............................................................................................................................. 4
(Requirements of 20 AAC 25.005(c)(10))............................................................................................................................................... 4
11.
Seabed Condition Analysis............................................................................................................ 4
(Requirements of 20 AAC 25.005(c)(11))............................................................................................................................................... 4
12.
Evidence of Bonding...................................................................................................................... 4
(Requirements of 20 AAC 25.005(c)(12))............................................................................................................................................... 4
13.
Proposed Drilling Program.............................................................................................................4
(Requirements of 20 AAC 25.005(c)(13))............................................................................................................................................... 4
Summaryof Operations................................................................................................................................................... 4
LinerRunning.................................................................................................................................................................. 5
14.
Disposal of Drilling Mud and Cuttings........................................................................................... 6
(Requirements of 20 AAC 25.005(c)(14))............................................................................................................................................... 6
15.
Directional Plans for Intentionally Deviated Wells........................................................................ 6
(Requirements of 20 AAC 25.050(b))..................................................................................................................................................... 6
16.
Quarter Mile Injection Review........................................................................................................ 6
(Requirements of 20 AAC 25.402).......................................................................................................................................................... 6
17.
Attachments.................................................................................................................................... 6
Attachment 1: Directional Plans for CD5-231-1 & CD5-231-1-01 laterals......................................................................... 6
Attachment 2: Current Well Schematic for CD5-23........................................................................................................ 6
Attachment 3: Proposed Well Schematic for CD5-231-1 & CD5-231-1-01 laterals........................................................... 6
Attachment 4: Quarter Mile Injection Review.................................................................................................................. 6
Page 1 of 6 January 15, 2020
PTD Application: CD5-231-1 & CD5-231-1-01
1. Well Name and Classification
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))
The proposed laterals described in this document are CD5-231-1 & CD5-231-1-01. All laterals will be classified
as "Development' wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c) (2))
These laterals will target the Alpine A and C sand packages. See attached 10-401 form for surface and
subsurface coordinates of the CD5-231-1 & CD5-231-1-01.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c) (3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,500 psi. Using the
maximum formation pressure in the area of 4900 psi in CD5-25 (i.e. 12.6 ppg EMW), the maximum
potential surface pressure in CD5-23, assuming a gas gradient of 0.1 psi/ft, would be 4154 psi. See
the "Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in CRU CD5-23 was measured at the datum to be 4564 psi (11.9 ppg EMW) on
12/1/2019. Formation pressures are expected to lower to around 4000 psi (10.3 ppg EMW) once CTD
operations commence due to shutting off injection. The maximum downhole pressure in the CD5-23 vicinity is
to the south in the CD5-25 injector. Pressure was measured to be 5850 psi, at the datum, (15.2 ppg EM" in
January of 2020. Injection will be turned off prior to drilling the CD5-23 laterals in order to lower formation
pressure to an acceptable level.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b)) i
CD5-23 has injected gas, so there is a possibility of encountering free gas while drilling the CD5-23 laterals. If
gas is detected in the returns the contaminated mud can be diverted to a storage tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c)) ✓
The major expected risk of hole problems in the CD5-23 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The CD5-23 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation
integrity test is not required.
Page 2 of 6 January 15, 2020
PTD Application: CD5-231_1 & CD5-231_1-01
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c) (6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm MD
MD
MD
TVDSS
TVDSS
Conductor
CD5-23L1
9300'
13,350'
7436'
7482'
2-7/8", 6.5#, L-80, ST -L slotted liner,-
iner;aluminum
Surface
115'
1530
520
Surface
aluminumbillet on to
CD5-23L1-01
8740'
13,250'
7390'
7391'
2-7/8", 6.5#, L-80, ST -L slotted liner;
2179'
3580
2090
Production
7-5/8"
de to ment sleeve
Existing Casing/Liner Information
Category
OD
Weight
f
Grade
Connection
Top MD
Btm MD
Top
TVD
Btm
TVD
Burst
psi
Collapse
psi
Conductor
20"
94.0
H-40
Welded
Surface
115'
Surface
115'
1530
520
Surface
10-3/4"
45.5
L-80
H d 563
Surface
2220'
Surface
2179'
3580
2090
Production
7-5/8"
29.7
L-80
H d 563
Surface
8621'
Surface
7444'
6890
4790
Tubing
4-1/2"
12.6
L-80
H d 563
Surface
8947'
Surface
7485'
8430
7500
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c) (8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System f
— Window milling operations: Water -Based PowerVis milling fluid (8.6 ppg)
1.
— Drilling operations: Water-based PowerVis mud (8.6 ppg). This mud weight will not hydrostatically
overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.8 ppg NaCl / NaBr completion fluid in order to
provide formation over -balance and well bore stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the CD5-23 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 January 15, 2020
PTD Application: CD5-231_1 & CD5-231_1-01
Pressure at the CDS-23 Window (8750' MD, 7461' TVD) Usinq MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c) (9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c) (10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
CRU well CD5-23 is an Alpine A -Sand injector equipped with 4-1/2" tubing and 7" production casing. The CTD
sidetrack will utilize two laterals to target the A and C -sands to the south of CD5-23. The laterals will increase A
and C -sand resource recovery and throughput.
Prior to CTD rig up, service coil will mill out the 3.725" XN-nipple at 8228' MD to 3.80" ID. CDR3 will set a
mechanical whipstock (4-1/2" monobore) inside the 4-1/2" tubing at the planned kick off point of 8750' MD. The
CD5-231_1 lateral will exit through the 4-1/2" tubing at 8750' MD and drill to a planned TD at 13,350' MD, targeting
the A sand to the south. The lateral will be completed with 2-7/8" slotted liner from TD up to 9300' MD with an
aluminum billet for kicking off.
The CD5-231_1-01 lateral will kick off at 9300' MD and drill to a planned TD of 13,250' MD targeting the C sand to
the south. It will be completed with 2-7/8" slotted liner from TD up into the 4-1/2" tubing at 8740' MD with a
deployment sleeve and seal bore assembly.
Pre -CTD Work
1. RU Slickline: Dummy whipstock drift, SBHP
2. RU CTU: Mill out XN-Nipple to 3.80" ID, cleanout if fill is encountered.
3. Prep site for Nabors CDR3-AC.
Page 4 of 6 January 15, 2020
Pumps On 1.9 bpm)
Pumps Off
Formation Pressure 10.3 •
4000 psi
4000 psi
Mud Hydrostatic 8.6
3337 psi
3337 psi
Annular friction i.e. ECD, 0.080psi/ft)
700 psi
0 psi
Mud + ECD Combined
no chokepressure)
4037 psi
overbalanced -37psi)
3337 psi
underbalanced -663psi)
Target BHP at Window 11.8
4578 psi
4578 psi
Choke Pressure Required to Maintain
Target BHP
541 psi
1241 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c) (9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c) (10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
CRU well CD5-23 is an Alpine A -Sand injector equipped with 4-1/2" tubing and 7" production casing. The CTD
sidetrack will utilize two laterals to target the A and C -sands to the south of CD5-23. The laterals will increase A
and C -sand resource recovery and throughput.
Prior to CTD rig up, service coil will mill out the 3.725" XN-nipple at 8228' MD to 3.80" ID. CDR3 will set a
mechanical whipstock (4-1/2" monobore) inside the 4-1/2" tubing at the planned kick off point of 8750' MD. The
CD5-231_1 lateral will exit through the 4-1/2" tubing at 8750' MD and drill to a planned TD at 13,350' MD, targeting
the A sand to the south. The lateral will be completed with 2-7/8" slotted liner from TD up to 9300' MD with an
aluminum billet for kicking off.
The CD5-231_1-01 lateral will kick off at 9300' MD and drill to a planned TD of 13,250' MD targeting the C sand to
the south. It will be completed with 2-7/8" slotted liner from TD up into the 4-1/2" tubing at 8740' MD with a
deployment sleeve and seal bore assembly.
Pre -CTD Work
1. RU Slickline: Dummy whipstock drift, SBHP
2. RU CTU: Mill out XN-Nipple to 3.80" ID, cleanout if fill is encountered.
3. Prep site for Nabors CDR3-AC.
Page 4 of 6 January 15, 2020
PTD Application: CD5-231_1 & CD5-23L1-01
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
2. Set top of 4-1/2" monobore whipstock at 8750' MD
3. CD5-23L1 Lateral (A sand - South)
a. Mill 3.80" window at 8750' MD.
b. Drill 4-1/4" bi-center lateral to TD of 13,350' MD.
c. Run 2-7/8" slotted liner with an aluminum billet from TD up to 9300' MD.
4. CD5-231_1-01 Lateral (C sand - South)
a. Kick off of the aluminum billet at 9300' MD.
b. Drill 4-1/4" bi-center lateral to TD of 13,250' MD.
c. Run 2-7/8" slotted liner with deployment sleeve and seal bore from TD up to 8740' MD.
5. Obtain SBHP, freeze protect, ND BOPE, and RDMO Nabors CRD3-AC.
Post -Rig Work
1. Return to production
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
- Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
- Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
- When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
- The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Liner Running
- The CD5-23 laterals will be displaced to an overbalancing fluid (11.8 ppg NaCl / NaBr) prior to running
liner. See "Drilling Fluids" section for more details.
- While running 2-7/8" slotted liner, a joint of 2-7/8" non -slotted tubing will be standing by for
emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew
conducts a deployment drill with this emergency joint on every slotted liner run. The 2-7/8" rams will
provide secondary well control while running 2-7/8" liner.
Page 5 of 6 January 15, 2020
PTD Application: CD5-231_1 & CD5-231_1-01
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AAC 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the Alpine Waste Injection Facility for grind and inject disposal.
• Incidental fluids generated from drilling operations will also be injected at the Alpine Waste Injection Facility
in disposal well (CD1-01A) or trucked to Kuparuk 1 B disposal facilities if the Alpine facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Alpine Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
— The Applicant is the only affected owner.
— Please see Attachment 1: Directional Plans
— Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
— MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
— Distance to Nearest Property Line (measured to CRU boundary at closest point)
Lateral Name
Distance
CD5-23L1
11,150'
CD5-23L1-01
11,150'
— Distance to Nearest Well within Pool
Lateral Name Distance Well
CD5-23L1 1114' CD5-201_1
CD5-23L1-01 1077' CD5-201_1
16. Quarter Mile Injection Review
(Requirements of 20 AAC 25.402)
The only wells that lie within %-mile of the proposed CD5-23 laterals are the CD5-23 mother bore, CD5-98L1,
CD5-20, and CD5-20L1. See the attached quarter mile review for further details.
17. Attachments
Attachment 1: Directional Plans for CD5-23L 1 & CD5-23L 1-01 laterals
Attachment 2: Current Well Schematic for CD5-23
Attachment 3: Proposed Well Schematic for CD5-23L 1 & CD5-23L 1-01 laterals
Attachment 4. Quarter Mile Injection Review
Page 6 of 6 January 15, 2020
Weill CRU XX -XX Nabors CDR3-AC: 4 -Ram BOP Configuration 2- Date I January 14, 2020
3/8" Coiled Tubing and 3" BHA
Quick Test Sub to Oti
Top of 7" Otis
Distances from top of
Excluding quick -test
Top of Annular
CL Annular
Bottom Annular Flan(
CL Blind/Shears
CL 2-3/8" Combi's
CL 3" Combi's
CL VBR's
CL of Top S
Top of Swal
CL Swab 1
Flow Tee
CL SSV
CL Master
LDS
Ground
Tree Size 1 4 1/16
ne
ConocoPhilli s
p
ConocoPhillips Alaska Inc_WNS
Western North Slope
CD5 Alpine West Pad
CD5-23
C135-231-1-01
Plan: CD5-23L1-O1_wp04
Standard Planning Report
07 January, 2020
Baker Hughes S
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Baker Hughes
Well CD5-23
Mean Sea Level
CD5-23 actual @ 70.25usft (Doyon 19)
True
Minimum Curvature
Project Western North Slope, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
ConocoPhillips
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaska InC_WNS
Project:
Western North Slope
Site:
CD5 Alpine West Pad
Well:
CD5-23
Wellbore:
CD5-231-1-01
Design:
CD5-23L1-01_wp04
ConocoPhillips
Planning Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Baker Hughes
Well CD5-23
Mean Sea Level
CD5-23 actual @ 70.25usft (Doyon 19)
True
Minimum Curvature
Project Western North Slope, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Wei Ilbore CD5-231-1-01
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(nT)
BGGM2017 12/31/2018 16.25 80.76 57,412
Design CD5-23L1-01_wp04
Audit Notes:
Version: Phase: PLAN Tie On Depth: 9,300.00
Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction
(usft) (usft) (usft) (°)
-33.70 0.00 0.00 160.00
Plan Sections
Site
CD5 Alpine West Pad
Site Position:
Northing:
5,965,782.04 usft Latitude:
700 18' 48.988 N
From:
Map
Turn
Easting:
349,218.85 usft Longitude:
151' 13' 19.334 W
Position Uncertainty:
System
0.00 usft
Slot Radius:
13.200in Grid Convergence:
-1.15 °
Well
CD5-23
(usft)
(I
(I
(usft)
Well Position
+NI -S
0.00 usft
Northing:
5,965,796.76 usft Latitude:
70° 18'49.113 N
9,300.00
+E/ -W
0.00 usft
Easting:
349,115.66 usft Longitude:
151° 13'22.353 W
Position Uncertainty
0.00
0.00 usft
Wellhead Elevation:
0.00 usft Ground Level:
33.70 usft
Wei Ilbore CD5-231-1-01
Magnetics Model Name Sample Date Declination Dip Angle Field Strength
(nT)
BGGM2017 12/31/2018 16.25 80.76 57,412
Design CD5-23L1-01_wp04
Audit Notes:
Version: Phase: PLAN Tie On Depth: 9,300.00
Vertical Section: Depth From (TVD) +N/ -S +E/ -W Direction
(usft) (usft) (usft) (°)
-33.70 0.00 0.00 160.00
Plan Sections
Measured
TVD Below
Dogleg
Build
Turn
Depth
Inclination
Azimuth
System
+N/ -S
+E/ -W
Rate
Rate
Rate
TFO
(usft)
(I
(I
(usft)
(usft)
(usft)
(°/loouslft)
(°110ousft)
(°/100usft)
(°) Target
9,300.00
89.90
129.89
7,436.48
3,231.65
-1,546.65
0.00
0.00
0.00
0.00
9,500.00
102.03
136.95
7,415.73
3,095.33
-1,402.47
7.00
6.06
3.58
30.00
9,660.00
102.03
148.40
7,382.39
2,971.11
-1,307.74
7.00
0.00
7.16
90.00
9,860.00
89.90
155.45
7,361.65
2,796.00
-1,214.43
7.00
-6.06
3.50
150.00
10,000.00
89.90
165.25
7,361.89
2,664.31
-1,167.40
7.00
0.00
7.00
90.00
10,200.00
89.76
173.25
7,362.48
2,467.98
-1,130.12
4.00
-0.07
4.00
91.00
10,700.00
89.76
153.25
7,364.55
1,991.64
-986.72
4.00
0.00
-4.00
-90.00
11,050.00
89.52
167.24
7,366.75
1,663.06
-868.72
4.00
-0.07
4.00
91.00
11,550.00
89.17
147.25
7,372.48
1,204.34
-676.33
4.00
-0.07
-4.00
-91.00
12,050.00
89.17
167.25
7,379.73
745.64
-483.96
4.00
0.00
4.00
90.00
12,350.00
89.38
155.25
7,383.53
462.10
-387.70
4.00
0.07
-4.00
-89.00
12,650.00
89.59
167.25
7,386.23
178.56
-291.45
4.00
0.07
4.00
89.00
13,250.00
89.59
143.25
7,390.55
-362.33
-42.07
4.00
0.00
0.00
-90.00
1/7/2020 5:29:39PM Page 2 COMPASS 5000.14 Build 85H
`. ConocoPhillips
ConocoPhillips Planning Report Baker Hughes
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaskalnc_WNS
Project:
Western North Slope
Site:
CD5 Alpine West Pad
Well:
CD5-23
Wellbore:
CD5-231-1-01
Design:
CD5-23L1-01_wp04
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well CD5-23
Mean Sea Level
CD5-23 actual @ 70.25usft (Doyon 19)
True
Minimum Curvature
Planned Survey
Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination
Azimuth
System
+N/ -S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(°)
(usft)
(usft)
9,300.00 -
89.90
129.89
7,436.48
3,231.65
-1,546.65
-3,565.74
0.00
0.00
5,969,058.60
347,634.37
TIP/KOP
9,400.00
95.97
133.40
7,431.36
3,165.33
-1,472.07
-3,477.91
7.00
29.94
5,968,990.80
347,707.60
9,500.00
102.03
136.95
7,415.73
3,095.33
-1,402.47
-3,388.34
7.00
29.76
5,968,919.42
347,775.77
Start DLS
7.00 TFO 90.00
9,600.00
102.03
144.10
7,394.89
3,019.89
-1,340.33
-3,296.19
7.00
89.26
5,968,842.75
347,836.38
9,660.00
102.03
148.40
7,382.39
2,971.11
-1,307.74
-3,239.20
7.00
89.56
5,968,793.33
347,867.98
Start DLS
7.00 TFO 150.00
9,700.00
99.60
149.82
7,374.89
2,937.39
-1,287.57
-3,200.62
7.00
149.86
5,968,759.22
347,887.47
9,800.00
93.54
153.35
7,363.45
2,850.07
-1,240.34
-3,102.41
7.00
149.77
5,968,670.97
347,932.93
9,860.00
89.90
155.45
7,361.65
2,796.00
-1,214.43
-3,042.74
7.00
149.96
5,968,616.39
347,957.75
Start Turn
7.00
9,900.00
89.90
158.25
7,361.72
2,759.22
-1,198.70
-3,002.80
7.00
90.00
5,968,579.31
347,972.73
10,000.00
89.90
165.25
7,361.89
2,664.31
-1,167.40
-2,902.91
7.00
90.01
5,968,483.80
348,002.11
Start DLS
4.00 TFO 91.00
10,100.00
89.83
169.25
7,362.12
2,566.80
-1,145.33
-2,803.73
4.00
91.00
5,968,385.87
348,022.22
10,200.00
89.76
173.25
7,362.48
2,467.98
-1,130.12
-2,705.67
4.00
91.01
5,968,286.77
348,035.44
Start DLS
4.00 TFO -90.00
10,300.00
89.76
169.25
7,362.89
2,369.17
-1,114.90
-2,607.61
4.00
-90.01
5,968,187.68
348,048.67
10,400.00
89.76
165.25
7,363.31
2,271.66
-1,092.83
-2,508.43
4.00
-90.01
5,968,089.75
348,068.77
10,500.00
89.76
161.25
7,363.72
2,175.92
-1,064.01
-2,408.61
4.00
-90.01
5,967,993.47
348,095.66
10,600.00
89.76
157.25
7,364.14
2,082.43
-1,028.59
-2,308.64
4.00
-90.01
5,967,899.29
348,129.20
10,700.00
89.76
153.25
7,364.55
1,991.64
-986.72
-2,209.01
4.00
-90.01
5,967,807.68
348,169.22
Start DLS
4.00 TFO 91.00
10,800.00
89.69
157.25
7,365.03
1,900.85
-944.86
-2,109.37
4.00
91.01
5,967,716.07
348,209.25
10,900.00
89.62
161.25
7,365.62
1,807.36
-909.43
-2,009.40
4.00
91.01
5,967,621.90
348,242.79
11,000.00
89.55
165.25
7,366.34
1,711.62
-880.61
-1,909.59
4.00
91.01
5,967,525.61
348,269.68
11,050.00
89.52
167.24
7,366.75
1,663.06
-868.72
-1,859.89
4.00
91.01
5,967,476.82
348,280.59
Start DLS
4.00 TFO -91.00
11,100.00
89.48
165.25
7,367.18
1,614.50
-856.84
-1,810.19
4.00
-91.01
5,967,428.04
348,291.50
11,200.00
89.41
161.25
7,368.15
1,518.77
-828.02
-1,710.38
4.00
-91.02
5,967,331.75
348,318.39
11,300.00
89.34
157.25
7,369.23
1,425.28
-792.59
-1,610.41
4.00
-91.02
5,967,237.58
348,351.92
11,400.00
89.27
153.25
7,370.44
1,334.50
-750.73
-1,510.78
4.00
-91.02
5,967,145.98
348,391.95
11,500.00
89.20
149.25
7,371.77
1,246.85
-702.64
-1,411.98
4.00
-91.03
5,967,057.39
348,438.27
11,550.00
89.17
147.25
7,372.48
1,204.34
-676.33
-1,363.03
4.00
-91.01
5,967,014.37
348,463.71
Start DLS
4.00 TFO 90.00
11,600.00
89.17
149.25
7,373.20
1,161.83
-650.02
-1,314.09
4.00
90.01
5,966,971.34
348,489.16
11,700.00
89.17
153.25
7,374.65
1,074.19
-601.93
-1,215.28
4.00
90.03
5,966,882.75
348,535.48
11,800.00
89.17
157.25
7,376.10
983.41
-560.07
-1,115.66
4.00
90.03
5,966,791.15
348,575.50
11,900.00
89.17
161.25
7,377.55
889.92
-524.65
-1,015.70
4.00
90.03
5,966,696.98
348,609.03
12,000.00
89.17
165.25
7,379.00
794.20
-495.84
-915.89
4.00
90.03
5,966,600.71
348,635.91
12,050.00
89.17
167.25
7,379.73
745.64
-483.96
-866.19
4.00
90.01
5,966,551.92
348,646.82
Start DLS
4.00 TFO -89.00
12,100.00
89.20
165.25
7,380.44
697.08
-472.07
-816.50
4.00
-89.01
5,966,503.14
348,657.72
12,200.00
89.27
161.25
7,381.77
601.35
-443.26
-716.69
4.00
-89.03
5,966,406.86
348,684.60
12,300.00
89.34
157.25
7,382.97
507.86
-407.84
-616.73
4.00
-89.02
5,966,312.68
348,718.14
12,350.00
89.38
155.25
7,383.53
462.10
-387.70
-566.84
4.00
-89.01
5,966,266.53
348,737.35
Start DLS
4.00 TFO 89.00
12,400.00
89.41
157.25
7,384.06
416.34
-367.57
-516.95
4.00
89.01
5,966,220.38
348,756.56
12,500.00
89.48
161.25
7,385.02
322.85
-332.15
-416.98
4.00
89.02
5,966,126.20
348,790.09
12,600.00
89.55
165.25
7,385.86
227.12
-303.33
-317.17
4.00
89.02
5,966,029.92
348,816.97
12,650.00
89.59
167.25
7,386.23
178.56
-291.45
-267.47
4.00
89.01
5,965,981.13
348,827.88
117/2020 5:29:39PM
Page 3
COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Planning Report Baker Hughes
Database:
EDT 14 Alaska Production
Vertical
Company:
ConocoPhillips Alaskalnc_WNS
Project:
Western North Slope
Rate
Site:
CD5 Alpine West Pad
(usft)
Well:
CD5-23
-279.56
Wellbore:
CD5-231-1-01
34.26
Design:
CD5-231-1-01_wp04
4.00
Planned Survey
-215.32
-17.99
Measured
TVD Below
Depth
Inclination Azimuth
System
(usft)
(°) (°)
(usft)
Start Turn 0.00
-321.75
12,700.00
89.59 165.25
7,386.59
12,800.00
89.59 161.25
7,387.31
12,900.00
89.59 157.25
7,388.03
13,000.00
89.59 153.25
7,388.75
13,100.00
89.59 149.25
7,389.47
13,200.00
89.59 145.25
7,390.19
13,250.00
89.59 143.25
7,390.55
Planned TD at 13250.00
7,366.75
1,663.06
-868.72
Start DLS 4.00 TFO -91.00
11,550.00
Casing Points
1,204.34
-676.33
Start DLS 4.00 TFO 90.00
Measured Vertical
7,379.73
745.64
Depth Depth
Start DLS 4.00 TFO -89.00
12,350.00
(usft) (usft)
462.10
-387.70
13,250.00 7,390.55 4-1/4"
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Well CD5-23
Mean Sea Level
CD5-23 actual @ 70.25usft (Doyon 19)
True
Minimum Curvature
Name
Plan Annotations
Map
Vertical
Dogleg
+N/ -S
+E/ -W
Section
Rate
(usft)
(usft)
(usft)
(°/100usft)
130.00
-279.56
-217.77
4.00
34.26
-250.74
-117.95
4.00
-59.23
-215.32
-17.99
4.00
-150.02
-173.46
81.65
4.00
-237.67
-125.37
180.46
4.00
-321.75
-71.28
277.97
4.00
-362.33
-42.07
326.09
4.00
Name
Plan Annotations
Map
Map
Azimuth
Northing
Measured
Vertical
Local Coordinates
(usft)
Depth
Depth
+N/ -S
+E/ -W
5,965,836.05
(usft)
(usft)
(usft)
(usft)
Comment
9,300.00
71436.48
3,231.65
-1,546.65
TIP/KOP
9,500.00
7,415.73
3,095.33
-1,402.47
Start DLS 7.00 TFO 90.00
9,660.00
7,382.39
2,971.11
-1,307.74
Start DLS 7.00 TFO 150.00
9,860.00
7,361.65
2,796.00
-1,214.43
Start Turn 7.00
10,000.00
7,361.89
2,664.31
-1,167.40
Start DLS 4.00 TFO 91.00
10,200.00
7,362.48
2,467.98
-1,130.12
Start DLS 4.00 TFO -90.00
10,700.00
7,364.55
1,991.64
-986.72
Start DLS 4.00 TFO 91.00
11,050.00
7,366.75
1,663.06
-868.72
Start DLS 4.00 TFO -91.00
11,550.00
7,372.48
1,204.34
-676.33
Start DLS 4.00 TFO 90.00
12,050.00
7,379.73
745.64
-483.96
Start DLS 4.00 TFO -89.00
12,350.00
7,383.53
462.10
-387.70
Start DLS 4.00 TFO 89.00
12,650.00
7,386.23
178.56
-291.45
Start Turn 0.00
13,250.00
7,390.55
-362.33
-42.07
Planned TD at 13250.00
Toolface
Map
Map
Azimuth
Northing
Easting
(°)
(usft)
(usft)
-90.01
5,965,932.34
348,838.79
-90.01
5,965,836.05
348,865.67
-90.01
5,965,741.88
348,899.21
-90.01
5,965,650.27
348,939.23
-90.01
5,965,561.68
348,985.55
-90.01
5,965,476.53
349,037.93
-90.01
5,965,435.38
349,066.32
Casing
Hole
Diameter
Diameter
(in)
(in)
2.875
4.250
1/7/2020 5:29:39PM Page 4 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Anticollision Report Baker Hughes cp
Company:
ConocoPhillips Alaska Inc_WNS
Project:
Western North Slope
Reference Site:
CD5 Alpine West Pad
Site Error:
0.00 usft
Reference Well:
CD5-23
Well Error:
0.00 usft
Reference Wellbore
CD5-231-1-01
Reference Design:
CD5-23L1-01_wp04
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well CD5-23
CD5-23 actual @ 70.25usft (Doyon 19)
CD5-23 actual @ 70.25usft (Doyon 19)
True
Minimum Curvature
2.00 sigma
EDT 14 Alaska Production
Offset Datum
Reference
CD523L1-01_wp04
GYD-GC-SS
Gyrodata gyro single shots
Filter type:
GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
MWD+IFR2+SAG+MS
Interpolation Method:
MD Interval 25.00usft
Error Model:
ISCWSA
Depth Range:
9,300.00 to 13,250.00usft
Scan Method:
Tray. Cylinder North
Results Limited by:
Maximum ellipse separation of 3,000.00 usft
Error Surface:
Combined Pedal Curve
Warning Levels Evaluated at: 2.79 Sigma
Casing Method:
Added to Error Values
Survey Tool Program Date 1(7/2020
From To
(usft) (usft) Survey (Wellbore) Tool Name Description
68.75
420.86 CD5-23 Srvy 1 - SLB_GWD70 (CD5-23)
GYD-GC-SS
Gyrodata gyro single shots
476.62
2,149.61 CD5-23 Srvy 2 - SLB_MWD+GMAG (CD5
MWD+IFR2+SAG+MS
OWSG MWD + IFR2 + Sag + Multi -Station Correction
2,196.91
2,290.64 CD5-23 Srvy 3 - SLB _MWD-Inc-Only-Fille
MWD -INC _ONLY (INC>10°) MWD-INC—ONLY—FILLER ( INC>10°)
2,384.39
8,560.75 CD5-23 Srvy 4 - SLB_MWD+GMAG (CD5
MWD+IFR2+SAG+MS
OWSG MWD + IFR2 + Sag + Multi -Station Correction
8,657.49
8,713.47 CD5-23 Srvy 5 - SLB _MWD+GMAG (CD5
MWD+IFR2+SAG+MS
OWSG MWD + IFR2 + Sag + Multi -Station Correction
8,713.47
9,300.00 CD5-23L1_wp03 (CD5-23L1)
MWD+IFR2+SAG+MS
OWSG MWD + IFR2 + Sag + Multi -Station Correction
9,300.00
13,250.00 CD5-23L1-01_wp04 (CD5-231-1-01)
MWD OWSG
OWSG MWD - Standard
Summary
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
1/7/2020 4:14:13PM Page 2 COMPASS 5000.14 Build 85H
Reference
Offset
Distance
Measured
Measured
Between
Between
Separation Warning
Site Name
Depth
Depth
Centres
Ellipses
Factor
Offset Well - Wellbore - Design
(usft)
(usft)
(usft)
(usft)
CD5 Alpine West Pad
CD5-08 - CD5-08 - CD5-08
Out of range
CD5-09 - CD5-09 - CD5-09
Out of range
CD5-10 - CD5-10 - CD5-10
Out of range
CD5-11 - CD5-11 - CD5-11
Out of range
CD5-11 - CD5-11 - CD5-11
Out of range
CD5-11 - CD5-11 L1 - CD5-11 L1_wp05 (Draft A)
Out of range
CD5-11 - CD5-11 L1 - CD5-11 L1_wp05 (Draft A)
Out of range
CD5-11 - CD5-11 L1-01 - CD5-11 L1-01_wp03 (Draft A)
Out of range
CD5-11 - CD5-11 L1-01 - CD5-11 L1-01_wp03 (Draft A)
Out of range
CD5-12 - CD5-12 - CD5-12
Out of range
CD5-17 - CD5-17 - CD5-17
Out of range
CD5-17 - CD5-17L1 - CD5-17L1
Out of range
CD5-18 - CD5-18 - CD5-18
Out of range
CD5-18 - CD5-18L1 - CD5-181_1
Out of range
CD5-19 - CD5-19 - CD5-19
Out of range
CD5-19 - CD5-19L1 - CD5-19L1
Out of range
CD5-20 - CD5-20 - CD5-20
9,771.30
13,250.00
1,120.22
932.67
5.973 CC, ES
CD5-20 - CD5-20 - CD5-20
11,800.00
15,325.00
1,321.64
1,086.02
5.609 SF
CD5-20 - CD5-201_1 - CD5-201_1
9,836.54
13,350.00
1,077.34
892.84
5.839 CC
CD5-20 - CD5-20L1 - CD5-201_1
9,850.00
13,375.00
1,077.38
892.76
5.836 ES
CD5-20 - CD5-20L1 - CD5-201_1
12,400.00
15,950.00
1,477.84
1,221.76
5.771 SF
CD5-21 - CD5-21 - CD5-21
Out of range
CD5-22 - CD5-22 - CD5-22
Out of range
CD5-23 - CD5-23 - CD5-23
9,323.08
8,650.00
407.31
403.00
94.518 CC, ES
CD5-23 - CD5-23 - CD5-23
10,388.64
7,800.00
426.43
414.63
36.134 SF
CD5-23 - CD5-231_1 - CD5-23L1_wp04
9,324.99
9,325.00
0.39
-1.01
0.477 STOP Drilling, CC, ES, SF
CD5-24 - CD5-24 - CD5-24
Out of range
CD5-24 - CD5-24L1 - CD5-24L1
Out of range
CD5-24 - CD5-24L1 PB1 - CD5-24L1 PB1
Out of range
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
1/7/2020 4:14:13PM Page 2 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Anticollision Report Baker Hughes ,'
Company:
ConocoPhillips Alaska Inc_WNS
Project:
Western North Slope
Reference Site:
CD5 Alpine West Pad
Site Error:
0.00 usft
Reference Well:
CD5-23
Well Error:
0.00 usft
Reference Wellbore
CD5-23L1-01
Reference Design:
CD5-23L1-01_wp04
Summary
Site Name
Offset Well - Wellbore - Design
CD5 Alpine West Pad
CD5-25 - CD5-251-1 - CD5-251-1
CD5-26 - CD5-26 - CD5-26
CD5-26 - CD5-26 - CD5-26
CD5-26 - CD5-261-1 - CD5-261-1
CD5-26 - CD5-26L1 - CD5-261-1
CD5-313 - CD5-313 - CD5-313
CD5-313 - CD5-313PB1 - CD5-313PB1
CD5-314 - CD5-314 - CD5-314
CD5-314X - CD5-314X - CD5-314X
CD5-315 - CD5-315 - CD5-315
CD5-315 - CD5-315PB1 - CD5-315PB1
CD5-316 - CD5-316 - CD5-316
CD5-316 - CD5-316PB1 - CD5-316PB1
CD5-92 - CD5-92 - CD5-92
CD5-98 - CD5-98 - CD5-98
CD5-98 - CD5-98 - CD5-98
CD5-98 - CD5-98 - CD5-98
CD5-98 - CD5-981-1 - CD5-981-1
CD5-98 - CD5-981-1 - CD5-981-1
CD5-98 - CD5-981-1 - CD5-98L1
Plan: CD5-27 (12C) - CD5-27 - CD5-27 (12C) wp03
Plan: CD5-28 (13C) - CD5-28 - CD5-28 wp07
Plan: CD5-29 (14C) - CD5-29 - CD5-29 wp01 v3 (14C)
Plan: CD5-31 (14B) - CD5-31 - CD5-31 wp01 v3 (14B)
Plan: CD5-32 (15B) - CD5-32 - CD5-32 wp01 v3 (15B)
Plan: CD5-33 (16B) - CD5-33 - CD5-33 wp01 v3 (16B)
Plan: CD5-34 (Sliver 1) - CD5-34 - CD5-34 wp02
Plan: CD5-35 (Sliver 2) - CD5-35 - CD5-35 wp01 v3 (Sliv
Plan: CD5-36 (Sun 5) - CD5-36 - CD5-36 wp02 v5 (Sun 5
Plan: CD5-93 (12A) - CD5-93 - CD5-93 wp02 v3 (12A)
Plan: CD5-94 (13A) - CD5-94 - CD5-94 wp03 v3 (13A) -
Plan: CD5-94 (13A) - CD5-94PH1 - CD5-94PH1 wp01 v3
Plan: CD5-95 (14A) - CD5-95 - CD5-95 wp01 v3 (14A)
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Well CD5-23
CD5-23 actual @ 70.25usft (Doyon 19)
CD5-23 actual @ 70.25usft (Doyon 19)
True
Minimum Curvature
2.00 sigma
EDT 14 Alaska Production
Offset Datum
Reference Offset Distance
Measured Measured Between Between Separation Warning
Depth Depth Centres Ellipses Factor
(usft) (usft) (usft) (usft)
13,000.00
21,300.00
1,404.03
1,031.66
13,068.62
21,425.00
1,406.25
1,028.79
13,200.00
21,650.00
1,419.26
1,033.68
12,943.15
21,175.00
1,332.99
990.69
13,000.00
21,275.00
1,335.77
989.40
13,100.00
21,450.00
1,347.77
994.94
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
3.770 CC
3.726 ES
3.681 SF
3.894 CC
3.856 ES
3.820 SF
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Out of range
Offset Design
CD5 Alpine West Pad - CD5-20 - CD5-20 - CD5-20
Survey Program: 84-GYD-GC-SS, 1130-MWD+IFR2+SAG+MS, 2386-MWD+IFR2+SAG+MS,
12257-MWD-INC_ONLY (INC>101), 12314-MWD+IFR2+SAG+MS
Reference
Offset
Semi Major
Axis
Distance
Measured
Vertical
Measured
Vertical
Reference
Offset
Azimuth
Offset Wellbore
Centre
Between
Between
Minimum
Separation
Depth
Depth
Depth
Depth
from North
+NIS
+E/ -W
Centres
Ellipses
Separation
Factor
(usft)
(usft)
(usft)
(usft)
(usft)
(usft)
(°)
(usft)
(usft)
(usft)
(usft)
(usft)
9,300.00
7,506.73
12,300.00
7,445.65
52.67
123.62
42.61
4,217.99
-719.39
1,288.79
1,116.23
172.56
7.469
9,314.98
7,506.64
12,325.00
7,447.05
52.55
123.61
43.09
4,196.84
-706.13
1,281.11
1,109.14
171.97
7.450
9,328.84
7,506.34
12,350.00
7,448.59
52.45
123.57
43.50
4,175.71
-692.86
1,273.64
1,101.21
172.43
7.386
9,350.00
7,505.49
12,375.00
7,450.30
52.29
123.54
44.18
4,154.57
-679.63
1,266.36
1,093.90
172.46
7.343
9,350.00
7,505.49
12,400.00
7,452.19
52.29
123.50
44.05
4,133.42
-666.43
1,259.19
1,085.48
173.71
7.249
9,370.49
7,504.22
12,425.00
7,454.21
52.18
123.47
44.66
4,112.26
-653.26
1,252.15
1,078.33
173.82
7.204
9,384.37
7,503.11
12,450.00
7,456.28
52.10
123.45
45.02
4,091.08
-640.15
1,245.29
1,071.00
174.29
7.145
9,400.00
7,501.61
12,475.00
7,458.38
52.02
123.42
45.43
4,069.87
-627.09
1,238.57
1,063.91
174.66
7.091
9,412.09
7,500.28
12,500.00
7,460.52
51.98
123.39
45.69
4,048.63
-614.07
1,232.00
1,056.77
175.23
7.031
9,425.92
7,498.57
12,525.00
7,462.69
51.94
123.37
46.01
4,027.33
-601.16
1,225.52
1,049.80
175.72
6.974
9,450.00
7,495.11
12,550.00
7,464.86
51.86
123.35
46.74
4,005.92
-588.44
1,219.11
1,043.43
175.68
6.939
Offset Site Error: 0.00 usft
Offset Welt Error: 0.00 usft
Warning
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
1/7/2020 4:14:13PM Page 3 COMPASS 5000.14 Build 85H
N
d
L
2
L
N
Y
6
m
5
2_8,�a`
0
K ¢ K K o
� ^S
0
J
M J
N N O
L6 Ci
O
U Urn
ED J ry Q
F 02
W 0
gym
W
O
m�
J a
J
3
z� un4p��m
of Adm_
2L600
g
y L O
0 O J
N y N
d
0 U
E �6 N
Q N N
N N Y ❑
�UUU �p
`' 3
au)R:0
IL` d4
J
N
ui
C
a
C
(uygsn O5E) (+)gljoN/(-)glIOS
T 0 C�
O O c
0 0 0 0 0 0 0 N
LL LL LL LL LL LL LL LL LL
0 0 o 0 0 0 0 0 0 o m
w'n oo
(.o LL w w E cn cn cn cn cn cn cn E ~
.�
O m 0 0 0 H O O o 0 0 0 0 H
c a m m m m m m L'Co m m m m m
o Q � cn cn cn Ln cn <n cn <n cn cn cn LL
LO avov.-r.-rnMrnv rrn
v
�000CV N �00Mc0 Sfl rt0
(p GOM�000 K)fD cO cD CO N
O MNOOrNdO MOD In N M
M M C? C? N CV N
N Z
N O O O O O O O O O O O 0 0
_ O U O O O O O O O O O O O O O
C7 O O O O O O r 0 0 0 0
N -cn
–J..*—
M0�000)0m09O a0 O)
O z10
U O O O O O O O O O O O O O
r
� r c Y M O N N N[ `7 t 0C> � r
r r M 0 r C' O
+ V' M N W (D V c+7 N
cD
w O
co
N i[yM �O�oO C' c0 '7 �L'O CO M
�Ci�cD� r MeY .0
Q 0 + M0 r0c0 c00cD0 r<D c0
N O O r p V 0 c D^ r Vr M
W M M M N N N N
pppp M J Ct W
� M M M tff V r M� r V rUJ N�
WO N G V C t t 0 N 0 C' J( p O
LD O > M W fD (O CO (0 [D r r w OD 0
co
r r r r r r r r r r r r r
L co
M
p aD N OLn C' � in
z l[) GOOK N
V NNN NNNNN
-��� t2 O V c0t2 t0�
Lo
U O M M O O t D to N r r co 0 0
C00000r r Cl) Lq Lq
ON N 00)00) 00000 m
�O NOO w wa0 a0 W aD w.000c0
O
W O O O O O O O O O O O O O O
+ 0 0 0 0 0 0 0 0 0 0 0 0 0
00000000InLO
Oococn000�R�2
N r 0� O M O N
O_ N_ N N M
c9O ��N MV �n cnr o000��
Z O
+
�a
O
V
O
c
O
U
(uJ13sn oSb) (+)uljoN/(-)43noS
n
c
0
A- WNS INJ WELLNAME CD5-23 -LLBORE C015-23
COil0001'I
T
Well Attributes Max Angle & MD
TD
IIIIIpS r
Alaska. Inc
ellbore APVUWI
Field Name171
ALPINE 10320761
Wellbore Shhu 1 ci (') MD (RKB)
IN .15 19,914.56
Ac! etm (ftKB)
27,430.0
CommemH2S (ppm)
Date Annotation End Date KBlard (R)
Rig Release Date
SSSV: NIPPLE
LAST WO: 36.55
124/2018
HORIZONTAL, CD5-23, 1111320196:06:42 AM
Last Tag
Vertical schematic (a I)
Annotation
Depth (RKB) End Date WeE
Last Mod By
LAST TAG:
C05-23
jennalt
Last Rev Reason
HANGER; 310
Annotation
End Data Wellbore
Last Mod By
Rev Reason: Pre CTD - Drift 8 SBHP
11/12/2019 JCD5,23
Iclaytg
Casing Strings
Casing Description OD (in) ID (in)
Top (RKB) Set Depth (RKB) Se[ Depth (ND)... NR/len p... Grade Top 7hreatl
�1
CONDUCTOR 20 19.12
33.3 115.0 115.0 94.00 H40
Welded
.
Casing Description OD (In) ID (in)
Top (ftKB) Set Depth (ftK8) Set Depth (ND)... Wt/Len (I... Grade Top Thread
SURFACE 103/4 9.95
37.0 2,219.6 2,179.0 45.50 L-80
Hyd 563
Casing Description OD (in) 10 lin)
Top(ftKB) Set Depth(RKB) Set Depth (TVD) WVLen(L.. Gmde Top Thread
INTERMEDIATE 75/8 6.88
34.0 8,620.8 7,444.3 29.70 L80
Hyd563
..................- ""..............."""'."""'
Casing Description OD in ID in
g pti ( ) ( )
T RKB Set
( ) Depth (ftK8) Set Depth (ND)... WULen (1... Grade Tap Thread
OPEN HOLE 63/4
8,621.0 27.430.0
,6
Tubing Strings
Tubing Description Strirg Ma... ID (in)
Top (nKB) Sat Depth (2. Sat bspth (ND) (... Wt (IbM) Gmde
lop Connection
Tubing 41/2 3.96
31.0 8,946.5 7,485.1 12.60 L-80
H563
CONDUCTOR, 33.3-115.0
Completion Details
Top (NO) Top Incl
Nominal
Top (ftKB) (RKB) ('I nem Des Com
ID (in)
31.0 31.0 0.00 HANGER
FMC 4-112" Tubing Hanger H563
3.958
NIPPLE: 2,070.9
2,070.9 2,039.2 20.13 NIPPLE
NIPPLE,LANDING,4 12",X,3.813, HYD563
3.813
INJ VALVE; 2.070.9
8,129.3 7,337.8 70.77 PACKER
Baker permanent production packer 4.5" TC -11 x 7 5/8" 29#
3.870
8,183.1 7,354.7 72.57 NIPPLE
NIPPLE,LANDING,4 12",X,3.813", HYD563
3.813
i I
8,227.7 7,367.5 74.04 NIPPLE
NIPPLE,LANDING,412",3.813"XN, 3.725"No-go HYD563
3.725
8,231.0 7,368.4 74.13 LINER
CROSSOVERA 112"HYD563 X TXP,BP,24"
3.958
8,232.9 7,368.9 1 74.18 LINER
Tubing,4 12",12.6#,L80, TXP
3.958
8.941.3 7,484.6 84.20 SHOE
Orange Peel Shoe (MILLED OUT FROM 1.00" TO 3.70" ON 3.700
SURFACE, 37.02,219.6
31231201$)
Other In Hole Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (NO)
Top Incl
GAS LIFT; 3.51333
Top (ftKB)
I (RKB)
I (")
I Des
ComRun
Dale
ID (in)
2,070.9
2,039.2
20.13
INJ VALVE
4.5" MCX INJ VALVE (SN:4281676-1) ON 3.813"X-
LOCK
11/12201
9
1.563
i t
i
e -
Mandrel Inserts
St
all
on Tap (ND)
N Top (RKB) (RKB) Make
Valve Latch Pont Size TRO Run
Model OD ()n) Sem Type Type (in) (psi)
Run Date Com
GAS LIFT, 5.862.0
1 3,583.3 3,453.8 SLB KBMG 1 GAS LIFT DMY BK -5
1/132019
Camco
2 5,882.0 5,595.5 SLB KBMG 1 GAS LIFT DMY BK -5
121/2018 No
Camco
Latch
3 6,398.3 6,077.2 SL8 KBMG 1 GAS LIFT DMY BK -5
1/162019
Camco
GAS LIFT: 6.3983
Notes: General & Safety
End Dam
Annotation
2/9/2018 NOTE: RUNNING NECK AND FISHING SWIVELED OFF DV IN STA #2. WOBBLE RING & SPRING
RECOVERED.
1 /1 612 01 9 NOTE: CONVERTED if PROD
TO INJECTOR
NOTE:
XO THREADS, e,1215-
,1215PACKER.
PACKER.8,129.3
XO THREADS, 8,1335
NIPPLE; 8.183.1
NIPPLE. 8,2277
INTERMEDIATE, 34.08620.8
PERF PUP: 8.9306
)I
SHOE; 6,941 3'
OPEN HOLE: 8,621 0-27 430 0
A
0
N N
a n
n. n
Z Z
0 000 0
� J
Ok O
vp �N
_ V NN`
V 117 v
O M N
O
0 04
1,
p
I I
i I
' 1 1
1 I
I I
' I I
I I
I 1
� I I
' 1 I
• �' 1 I
I i
•
i 1
I 1
I i
1 I
1
1 ,
„
I
I I
I I
I I
I I
I I
I I
i I
1 I
p 1 1
CO
1 1
p
rn
G ^
p
p
CO
pO
M
I 1
Lo
N Q. ,r
ih
o
in
in
eo
iv
00
p
O
�
p
CM
� r
N
O @
LO
ih
M
N
N
@
U
p
O
O�
V
p
O
N
00"0\
V
00
CV
�* _a
N Z
m
c
o
c
co
a
Y
N
a
Z
c
J
a
Z
m
c
J
0
N N
a n
n. n
Z Z
0 000 0
� J
Ok O
vp �N
_ V NN`
V 117 v
O M N
O
0 04
1,
,1
1,
I I
i I
' 1 1
1 I
I I
' I I
I I
I 1
� I I
' 1 I
• �' 1 I
I i
•
i 1
I 1
I i
1 I
1
1 ,
„
I
I I
I I
I I
I I
I I
I I
i I
1 I
p 1 1
CO
1 1
G ^
„
CO
pO
I 1
Lo
N Q. ,r
m
MSH
N
`
♦jj � � , 1
00
1 _
II
I,
rl
tr
,I
r,
,r
II
Ir
,r
,r
I,
rr
r,
CV
b o
O
O
N
ju-)
!I
1
'
1 t
+
it
11
,1
Ulm
00
00
q
O
N
//Al^
r— N
\♦♦♦
0
N N
a n
n. n
Z Z
0 000 0
� J
Ok O
vp �N
_ V NN`
V 117 v
O M N
O
0 04
1,
,1
1,
1 ,
„
apo
G ^
„
CO
pO
Lo
N Q. ,r
I1
MSH
N
`
♦jj � � , 1
II
, i
II
I,
rl
tr
,I
r,
,r
II
Ir
,r
,r
I,
rr
r,
1
b o
!I
1
'
1 t
+
it
11
,1
Ulm
\
\
\\
\
2
}
\§
}
—
k k
\
\
\
ci
\\\}\@}\¥
){/}\})\\
\�
k
& k
§
}
}
)\
>
k k
j
\
\
\k
%
\ o
oIn
\
\
E
\
)
\
3:§
§
§
ASRC-NPR4
SRC-AiPR2
S
•a
�n
Y
i�
n�
ASRC-NPR3
8
0175 2 �
Nieli Pad
C -5
wep Path
cbs
CD5-231 1 Open Interval1jlr
CD5-231-11-01 Open Interval
CD5-23L1 01 1/4 Butter
C135-231-1-01 0114 Buifer
x� r
Weld m radlti i
ASRC-NPR4 6
t— I Aipsne PA
—
j Umt b3undary
ci? ofd �
Q'•.'PAi Lease
' $�
CVIIoc6PhiI'ip
Alaska
N
CDS-23L1 & CDS-23L1-01
10-403 Sundry
0 0-2
0.4
1/1412020
Miles
Remark:
AOGCC
PTD No. 210-011 Coordinate Check
23 January 2020
INPUT
Geographic, NAD27
OUTPUT
State Plane, NAD27
5004 - Alaska 4, U.S. Feet
CRU CD5-23L1-01 1/1
Latitude: 70 18 49.11300 NorthingN: 5965796.791
Longitude: 151 13 22.35300 Easting/X: 349115.649
Convergence: -1 09 05.11050
Scale Factor: 0.999925862
Corpscon v6.0.1, U.S. Army Corps of Engineers
TRANSMITTAL LETTER CHECKLIST
WELL NAME: �1=�'� S L C
PTD:
Development 4/Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: Cil 1tx'/ �� /i/f�� POOL:
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
LATERAL
The permit is for a new wellbore segment of existing well Permit
No. '_71.Z-11' API No. 50--,623-_ 76;-- 66.
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name L PH) and API number (50- -
- -� from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
well logs to be run. In addition to the well logging program proposed by
(Company) in the attached application, the following well logs are
also required for this well:
/
Well Logging
✓
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool COLVILLE RIVER, ALPINE OIL - 120100
Well Name: COLVILLE RIV UNIT CD5-23L1-01 Program SER Well bore seg ❑d
PTD#: 2200110 Company ConocoPhillips Alaska, Inc. Initial Class/Type
SER/PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal ❑
Administration
1
Permit fee attached
NA
2
Lease number appropriate_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - -
Yes
Surface location in ASRC,NPR4; top productiv_e_interval & TD_ in ASRC-NPR2
3
Unique well name and number - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yes -
_ . - _
4
Well located in_a_definedpo _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes -
_ - - COLVILLE_ RIVER, ALPINE- OIL - 120100, governed by CO 443C. - - - - - - - -
5
Well located proper distance from drilling unit_bounda y- --- - - _ - - . - - - - - - - - -
Yes
CO No. 443C contains- no spacing -restrictions with respect to drilling_unit boundaries.- -
6
Well located proper distance from other wells- - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yes -
- - - - - - CO No._443C has no_interwell spacing restrictions. Wellbore will be more than 500' -
7
Sufficient acreage available in -drilling unit- - - - - - - - - - - - - - - - - - - - - -
Yes -
- - - _ - - from an external property line_ where_ ownership or -------
- - - - - -
8
8
-if deviated, is -wellbore plat -included - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yes -
- _ - _ As planned, well will conform to spacing requirements.- . _ _ _ _ - - _ --------------
9
Operator only affected party_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _Yes
-------------------------------------
10
Operator has appropriate_ bond in force - - - - - - - - - - - - - - - - - - - - - - _ _ - - _ - -
Yes -
- - - - - - - - - - - - - - - - _ _ _ _ -----------------------------
11
Permit_can be issued without conservation order- - - - - - - - - - - - - - - - - - - - - - -
Yes
- - - - - - _ - _ - - - - - - - - - - - - - - - - - - -
Appr Date
12
Permit can be issued without administrative_approval - - - - - - - - - - - - - - - - - - - - - - - - -
Yes -
- - - - - - - - - - - - - - - - - - - - - - - - - - -
13
Can permit be approved before 15-daywait____ _______
Yes
SFD 1/23/2020
-- - - - - --
---------------------------------------
---------- -----
14
Well located within area and -strata authorized by Injection Order # (put 10# in_comments)_(For_
Yes -
- Injection governed by Area Injection -Order No, 1.8D. - - - - - - - - .
15
All wells -within 1/4_mile area of review identified (For service well only) - - - - - - - - - - - - - - -
Yes -
- - - - - - CRU CD5-20, CD5-20L1, CD5-23,_CD5-98, CD5-98L1- - -
16
Pre -produced injector; duration of pre production less than 3 months _(For service well only) _ _
No_ -
- - - - - - - - - - - - - - - - - - - - - - - -
17
Nonconven. gas conforms to AS31.05.030(j 1_.A),(y2.A-D) - - - - - _ _ _ _
NA- -
- - - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ - - - - - - - -
18
Conductor string -provided - - - - - - - - - - - - - - - - _ _ _ _ _ _
NA_ _
- _ - - - - Conductor -set-for-CRU-CD5-23 - - - _ _ _ _ - --------------------
Engineering
19
Surface _casing_pmtects all -known USDWs - - - - - - - - - - - - - - - - - - - - - - -
NA_
- - - _ Surface casing set for CRU_CD5-23_ - - - - -
20
CMT-vol_adequate_to circulate on conductor _& surf_csg - _ _ -
NA_ -
- - - - - _ Surface casing set and fully_cemented - - - - - -
21
CUT vol_adequate_to tie-in long string to surf csg- - _ _ - - - -
NA_
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
22
CMT -will coverall known productive horizons_ _ - _ _ _ _ _ _ _ _
No
- _ _ _ Productive- interval will be completed with_ uncemented liner
23
Casing designs adequate for C,_T, B &_ permafrost - - - - - - - - - - - - -
Yes
- - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - .
24
Adequate tankage_orreserve pit - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yes-
_ - Rig has steel tanks; all _waste -to approved disposal wells_ - - - - - - -- - - - - - - - - -- - - -
25
If a- re -drill, has_a_ 10-403 for abandonment been approved - - - - - - - - - - - - - - - - - - - - - -
NA_
- - - _ _ _ - - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
26
Adequate wellbore separation proposed - - - - - - - - - - - - - - - - - - - - - - - - - - -
Yes -
- - - - - - Anti -collision analysis complete; no major risk failures -- - -- - - - - - - - - - - - - - - - - - - -
27
If_diverterrequired, does itmeet_ regulations _______________________________
NA________________
Appr Date
28
Drilling fluid- program schematic & equip list adequate- - - - - - - - - - - - - - - - - - _ _ _ _ _
-
Yes -
- Max formation_ pressure is_4900 psig(12.6 ppg EMW); will drill -w/ 8.6_ppg EMW an_d maintain ov_erbal_w/ MPD - - -
VTL1/27/2020
29
BOPEs._dothey meet regulation - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -
Yes-
- - - -- - - - -- - - - - - - ---- - -- ------ - - - --- - - - - - - - - - - - - - - - - - - - - - - - - - - -- - -
30
BOPE_press rating appropriate; test to -(put psig in comments)- - - - - - - - - - - - - - - - - - - -
Yes -
- - - - - _ MPSP si 4154 psig; will test SOPs_to 4500-psig _ _ _ _ _ - - - - - - - - _ _ _ - - - _ - - - - - - - -
31
_ hoke_manifoldcompliesw/API_RP-53(May$4)____________________________Yes________-___________________________________________--
32
Work will occur without operation shutdown_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
- - - _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ _ _ - - - -
33
Is presence_ ofH2Sgas probable ------- _________________________
Yes -------H2Smeasures
required -------------------------- -------------------
34
Mechanical -condition of wells within AOR verified (For service well only) - - - - - - - - - _ _
Yes -
_ _ _ _ _ _ CD5-23, CD5-98,_CD5-98L1, CD5720 &_CD5-20L1 in AOR and mech cond verified - - - - - - - - - -
35
Permit can be issued w/o hydrogen_ sulfide measures - - - - - - - - - - - - - - - - - - - - - - - - -
No- -
_ _ _ _ _ - 1-12S has been encountered_in Alpine Oil Pool wells drilled from CD5_Pad._H2S_measures required.
Geology
36
Data presented on potential overpressure zones
Yes _
- Maximum expected r_eservoirpressure is about 12.6 ppg_EMW,_ & expected_ reservoir pressure is
Appr Date
37
Seismic analysis of shallow gas -zones- - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _
NA_ _
- - about- 11.9_ppg EMW; will be drilled with 8.6 ppg mud using coiled tubing and Managed Pressure_
SFD 1/23/2020
38
Seabed condition survey -(if off_ -shore) - - - - - - - - - - - - - - - - - - - _ - _ - -
NA_ -
- - - - - - Drilling technique to maintain borehole stability in shale sections and manage reservoir -pressure.-
39
Contact name/phone for weekly -progress reports [exploratory only] - - - - - - - - - - - - - - - - -
NA_ -
- - - - - - Some potential for encountering free gas while drilling. -Mitigation-discussed on page 2._