HomeMy WebLinkAbout219-184DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21826-60-00Well Name/No. KUPARUK RIV UNIT 3O-04L1Completion Status1-OILCompletion Date4/12/2020Permit to Drill2191840Operator ConocoPhillips Alaska, Inc.MD11874TVD6587Current Status1-OIL6/16/2020UICNoWell Log Information:DigitalMed/FrmtReceivedStart StopOH /CHCommentsLogMediaRunNoElectr DatasetNumberNameIntervalList of Logs Obtained:GR/ResNoNoYesMud Log Samples Directional SurveyREQUIRED INFORMATION(from Master Well Data/Logs)DATA INFORMATIONLog/DataTypeLogScaleC4/30/2020 Electronic File: 3O-04L1 EOW NAD27.pdf32981EDDigital DataC4/30/2020 Electronic File: 3O-04L1 EOW NAD27.txt32981EDDigital DataC4/30/2020 Electronic File: 3O-04L1 EOW NAD83.pdf32981EDDigital DataC4/30/2020 Electronic File: 3O-04L1 EOW NAD83.TXT32981EDDigital Data0 0 2191840 KUPARUK RIV UNIT 3O-04L1 LOG HEADERS32981LogLog Header Scans0 0 2191840 KUPARUK RIV UNIT 3O-04L1 PB1 LOG HEADERS32982LogLog Header ScansC4/30/2020 Electronic File: 3O-04L1PB1 EOW NAD27.pdf32982EDDigital DataC4/30/2020 Electronic File: 3O-04L1PB1 EOW NAD27.txt32982EDDigital DataC4/30/2020 Electronic File: 3O-04L1PB1 EOW NAD83.pdf32982EDDigital DataC4/30/2020 Electronic File: 3O-04L1PB1 EOW NAD83.TXT32982EDDigital DataC5/8/20208313 11874 Electronic Data Set, Filename: 3O-04L1 GAMMA RES.las33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 2MD Final.cgm33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 5MD Final.cgm33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 5TVDSS Final.cgm33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 2MD Final.pdf33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 5MD Final.pdf33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 5TVDSS Final.pdf33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 EOW NAD27.pdf33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 EOW NAD27.txt33010EDDigital DataTuesday, June 16, 2020AOGCCPage 1 of 43O-04L1 GAMMA RES.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21826-60-00Well Name/No. KUPARUK RIV UNIT 3O-04L1Completion Status1-OILCompletion Date4/12/2020Permit to Drill2191840Operator ConocoPhillips Alaska, Inc.MD11874TVD6587Current Status1-OIL6/16/2020UICNoC5/8/2020 Electronic File: 3O-04L1 EOW NAD83.pdf33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 EOW NAD83.TXT33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 Final Surveys TD at 11874 ft MD.csv33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 Final Surveys TD at 11874 ft MD.xlsx33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 Survey Listing.txt33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 Surveys.txt33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1_25_tapescan_BHI_CTK.txt33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1_5_tapescan_BHI_CTK.txt33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1_output.tap33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 2MD Final.tif33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 5MD Final.tif33010EDDigital DataC5/8/2020 Electronic File: 3O-04L1 5TVDSS Final.tif33010EDDigital Data0 0 2191840 KUPARUK RIV UNIT 3O-04L1 LOG HEADERS33010LogLog Header Scans0 0 2191840 KUPARUK RIV UNIT 3O-04L1 PB1 LOG HEADERS33012LogLog Header ScansC5/8/20208313 8752 Electronic Data Set, Filename: 3O-04L1PB1 GAMMA RES.las33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 2MD Final.cgm33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 5MD Final.cgm33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 5TVDSS Final.cgm33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 2MD Final.pdf33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 5MD Final.pdf33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 5TVDSS Final.pdf33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 EOW NAD27.pdf33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 EOW NAD27.txt33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 EOW NAD83.pdf33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 EOW NAD83.TXT33012EDDigital DataTuesday, June 16, 2020AOGCCPage 2 of 43O-04L1PB1GAMMA RES.las
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21826-60-00Well Name/No. KUPARUK RIV UNIT 3O-04L1Completion Status1-OILCompletion Date4/12/2020Permit to Drill2191840Operator ConocoPhillips Alaska, Inc.MD11874TVD6587Current Status1-OIL6/16/2020UICNoWell Cores/Samples Information:ReceivedStart Stop CommentsSentSample SetNumberNameIntervalINFORMATION RECEIVEDCompletion ReportProduction Test InformationGeologic Markers/TopsY Y / NAYComments:Compliance Reviewed By:Date:Mud Logs, Image Files, Digital DataComposite Logs, Image, Data Files Cuttings SamplesY / NAYY / NADirectional / Inclination DataMechanical Integrity Test InformationDaily Operations SummaryYY / NAYCore ChipsCore PhotographsLaboratory AnalysesY / NAY / NAY / NACOMPLIANCE HISTORYDate CommentsDescriptionCompletion Date:4/12/2020Release Date:12/13/2019C5/8/2020 Electronic File: 3O-04L1PB1_25_tapescan_BHI_CTK.txt33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1_5_tapescan_BHI_CTK.txt33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1_output.tap33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 2MD Final.tif33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 5MD Final.tif33012EDDigital DataC5/8/2020 Electronic File: 3O-04L1PB1 5TVDSS.tif33012EDDigital DataTuesday, June 16, 2020AOGCCPage 3 of 4M. Guhl6/16/2020
DATA SUBMITTAL COMPLIANCE REPORTAPI No. 50-029-21826-60-00Well Name/No. KUPARUK RIV UNIT 3O-04L1Completion Status1-OILCompletion Date4/12/2020Permit to Drill2191840Operator ConocoPhillips Alaska, Inc.MD11874TVD6587Current Status1-OIL6/16/2020UICNoTuesday, June 16, 2020AOGCCPage 4 of 4
1a. Well Status:Oil SPLUG Other Abandoned Suspended
1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
GINJ WINJ WDSPL No. of Completions: ____________________ Service Stratigraphic Test
2. Operator Name: 6. Date Comp., Susp., or 14. Permit to Drill Number / Sundry:
Aband.:
3. Address: 7. Date Spudded: 15. API Number:
4a. Location of Well (Governmental Section): 8. Date TD Reached: 16. Well Name and Number:
Surface:
Top of Productive Interval:9. Ref Elevations: KB:59 17. Field / Pool(s):
GL:19 BF:
Total Depth: 10. Plug Back Depth MD/TVD: 18. Property Designation:
4b. Location of Well (State Base Plane Coordinates, NAD 27): 11. Total Depth MD/TVD: 19. DNR Approval Number:
Surface: x- y- Zone- 4
TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD:
Total Depth: x- y- Zone- 4
5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic information per 20 AAC 25.050
22. Logs Obtained:
23.
BOTTOM
16 H-40 115
9 5/8 J-55 4029
7J-55 6769
2 3/8 L-80 6587
24. Open to production or injection? Yes No 25.
26.
Was hydraulic fracturing used during completion? Yes No
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27.
Date First Production: Method of Operation (Flowing, gas lift, etc.):
Hours Tested: Production for Gas-MCF:
Test Period
Casing Press:Calculated Gas-MCF:Oil Gravity - API (corr):
Press. 24-Hour Rate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Gas
WAG
ConocoPhillips Alaska, Inc 4/12/2020 219-184
P.O. Box 100360 Anchorage, AK 99510-0360 3/27/2020 50-029-21826-60-00
789' FNL, 1879 ' FWL, Sec 22, T13N, R9E, UM 4/3/2020 KRU 3O-04L1
3997' FNL, 2903' FEL, Sec 16, T13N, R9E, UM Kuparuk River Field/Kuparuk Oil Pool
1446' FNL, 2465' FEL, Sec 16, T13N, R9E, UM 8660/6545 ADL 25513
525516 6022030 11874/6587
LONS 85-100
520723 6024087
521147 6026639 N/A 1734/1659
8620/6519
List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray,
caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation
record. Acronyms may be used. Attach a separate page if necessary
GR/Res
CASING, LINER AND CEMENTING RECORD
N/A
CASING WT. PER
FT.GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD
AMOUNT
PULLEDTOP BOTTOM TOP
62.5 35 115 35 24 199sx AS III
36 35 5099 35 12 1/4 1200sx AS III, 375sx class G
Slotted Liner
26 33 8961 33 8 1/2 300sx Class G, 175sx AS I
4.6 9451 11874 6618 3
TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
3 1/2 8549 8477
SLOTTED LINER@
9460 - 11874 MD and 6619-6587 TVD…...04/04/2020 ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Per 20 AAC 25.283 (i)(2) attach electronic information
PRODUCTION TEST
N/A - not online WAITING FOR HOOKUP
Date of Test: Oil-Bbl: Water-Bbl: Choke Size: Gas-Oil Ratio:
Sr Pet Eng Sr Pet Geo Sr Res Eng
Flow Tubing Oil-Bbl:Water-Bbl:
WINJ
SPLUG Other Abandoned Suspended
Stratigraphic Test
No
No
(attached) No
REVISED
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
By Huey Winston at 2:29 pm, May 27, 2020
Completion Date
4/12/2020
HEW
RBDMS HEW 5/13/2020
GDSR-5/27/2020DLB 05/28/2020VTL 6/11/20
SFD 6/10/2020
1a. Well Status:Oil SPLUG Other Abandoned Suspended 1b. Well Class:
20AAC 25.105 20AAC 25.110 Development Exploratory
GINJ WINJ WDSPL No. of Completions: __________________ Service Stratigraphic Test
2.Operator Name:6.Date Comp., Susp., or 14.Permit to Drill Number / Sundry:
Aband.:
3. Address: 7.Date Spudded: 15. API Number:
4a. Location of Well (Governmental Section): 8.Date TD Reached: 16.Well Name and Number:
Surface:
Top of Productive Interval:9. Ref Elevations: KB:59 17. Field / Pool(s):
GL:19 BF:
Total Depth: 10.Plug Back Depth MD/TVD: 18.Property Designation:
4b. Location of Well (State Base Plane Coordinates, NAD 27): 11.Total Depth MD/TVD: 19.DNR Approval Number:
Surface: x- y- Zone-4
TPI: x- y- Zone- 4 12. SSSV Depth MD/TVD: 20. Thickness of Permafrost MD/TVD:
Total Depth: x- y- Zone- 4
5. Directional or Inclination Survey: Yes (attached) No 13. Water Depth, if Offshore: 21. Re-drill/Lateral Top Window MD/TVD:
Submit electronic information per 20 AAC 25.050
22.Logs Obtained:
23.
BOTTOM
16 H-40 115
9 5/8 J-55 4029
7J-55 6769
2 3/8 L-80 6587
24. Open to production or injection? Yes No 25.
26.
Was hydraulic fracturing used during completion? Yes No
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27.
Date First Production: Method of Operation (Flowing, gas lift, etc.):
Hours Tested: Production for Gas-MCF:
Test Period
Casing Press:Calculated Gas-MCF:Oil Gravity - API (corr):
Press.24-Hour Rate
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
Gas
WAG
ConocoPhillips Alaska, Inc 4/12/2020 219-184
P.O. Box 100360 Anchorage, AK 99510-0360 3/27/2020 50-029-21825-60-00
789' FNL, 1879 ' FWL, Sec 22, T13N, R9E, UM 4/3/2020 KRU 3O-04L1
3997' FNL, 2903' FEL, Sec 16, T13N, R9E, UM Kuparuk River Field/Kuparuk Oil Pool
1446' FNL, 2465' FEL, Sec 16, T13N, R9E, UM 8660/6545 ADL 25513
525516 6022030 11874/6587
LONS 85-100
520723 6024087
521147 6026639 N/A 1734/1659
8620/6519
List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data within 90 days of completion,
suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray,
caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation
record. Acronyms may be used. Attach a separate page if necessary
GR/Res
CASING, LINER AND CEMENTING RECORD
N/A
CASING WT. PER
FT.GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD
AMOUNT
PULLEDTOP BOTTOM TOP
62.5 35 115 35 24 199sx AS III
36 35 5099 35 12 1/4 1200sx AS III, 375sx class G
Slotted Liner
26 33 8961 33 8 1/2 300sx Class G, 175sx AS I
4.6 9451 11874 6618 3
TUBING RECORD
If Yes, list each interval open (MD/TVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
3 1/2 8549 8477
SLOTTED LINER@
9460 - 11874 MD and 6619-6587 TVD…...04/04/2020 ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Per 20 AAC 25.283 (i)(2) attach electronic information
PRODUCTION TEST
N/A - not online WAITING FOR HOOKUP
Date of Test: Oil-Bbl: Water-Bbl: Choke Size: Gas-Oil Ratio:
Sr Pet Eng Sr Pet Geo Sr Res Eng
Flow Tubing Oil-Bbl:Water-Bbl:
WINJ
SPLUG Other Abandoned Suspended
Stratigraphic Test
No
No
(attached) No
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
By Samantha Carlisle at 2:40 pm, May 12, 2020
6
59
SUPERCEDED
SFD 6/10/2020
Conventional Core(s): Yes No Sidewall Cores:
30.
MD TVD
Surface Surface
1734 1659
Top of Productive Interval 8653 6540
3O-04L1PB1 8751 6556
TD 11874 6587
31.List of Attachments:Daily Operations Summary, Definitive Survey, Schematic
32. I hereby certify that the foregoing is true and correct to the best of my knowledge.
James Ohlinger Contact Name: Jeff Connelly
Staff CTD Engineer Contact Email: jeff.s.connelly@cop.com
Authoriz Contact Phone:(907) 328-8854
Genera
Item 1a
Item 1b
Item 4b
Item 9:
Item 15
Item 19
Item 20
Item 22
Item 23
Item 24
Item 27
Item 28
Item 30
Item 31
28. CORE DATA Yes No
If Yes, list formations and intervals cored (MD/TVD, From/To), and summarize lithology and presence of oil, gas or water (submit separate pages with this
form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29.GEOLOGIC MARKERS (List all formations and markers encountered): FORMATION TESTS
NAME Well tested? Yes No
Permafrost - Top If yes, list intervals and formations tested, briefly summarizing test results.
Attach separate pages to this form, if needed, and submit detailed test
information, including reports, per 20 AAC 25.071.
Permafrost - Base
Formation @TPI-Kuparuk D
Formation at total depth:
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
paleontological report, production or well test results, per 20 AAC 25.070.
Authorized Name:
Authorized Title:
Signature w/Date:
INSTRUCTIONS
This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10-404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
TPI (Top of Producing Interval).
The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00-00).
Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability,
fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data within 90 days of completion,
suspension, or abandonment, whichever occurs first.
Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
No
No Sidewall Cores: Yes No
Form 10-407 Revised 3/2020 Submit within 30 days of Completion, Suspension, or Abandonment
Digitally signed by James Ohlinger
DN: CN=James Ohlinger, O=ConocoPhillips, OU=CTD,
E=James.J.Ohlinger@conocophillips.com, C=USReason: I am the author of this document
Location: your signing location here
Date: 2020-05-12 14:26:57
Foxit PhantomPDF Version: 9.7.0
James
Ohlinger
Kuparuk D
3O-04 Final CTD SchematicUpdated: JSC (4/13/2020)TOWS @ 8620' MD16" 62# H-40 shoe @ 115' MD3O-04L1-01TD @ 12,079' MDSlotted liner: 12,035' to 7930.5' (NS seal-bore recepticle)3O-04L1TD @ 11,784'' MDSlotted liner: 11,784' to 9447' MD (liner-top billet)TOWS @ 8660' MDSeal-bore deployment sleeveFor liner-top packer post rigTop at 7930'Packer not yet set: 4/12/20203O-04L1_PB1Slotted Liner: 8718' to 8656' (to preserve perf's)Wash-down depth = 8751' (No new hole drilled)Note: FCO of lateral L1-01 will require pulling liner from 8621'to 7930'
Last Tag
Annotation Depth (ftKB) End Date Wellbore Last Mod By
Last Tag: ELMD, TIED INTO K1 MARKER AT 8344' MD 8,684.0 12/29/2019 3O-04 condijw
Last Rev Reason
Annotation End Date Wellbore Last Mod By
Rev Reason: Set LTP 4/16/2020 3O-04 fergusp
Casing Strings
Casing Description
CONDUCTOR
OD (in)
16
ID (in)
15.06
Top (ftKB)
35.0
Set Depth (ftKB)
115.0
Set Depth (TVD) …
115.0
Wt/Len (l…
62.50
Grade
H-40
Top Thread
Welded
Casing Description
SURFACE
OD (in)
9 5/8
ID (in)
8.92
Top (ftKB)
35.0
Set Depth (ftKB)
5,099.2
Set Depth (TVD) …
4,029.0
Wt/Len (l…
36.00
Grade
J-55
Top Thread
BTC
Casing Description
PRODUCTION
OD (in)
7
ID (in)
6.28
Top (ftKB)
33.0
Set Depth (ftKB)
8,961.3
Set Depth (TVD) …
6,768.7
Wt/Len (l…
26.00
Grade
J-55
Top Thread
BTC
Casing Description
LINER
OD (in)
4 1/2
ID (in)
3.96
Top (ftKB)
7,951.4
Set Depth (ftKB)
8,850.0
Set Depth (TVD) …
6,686.8
Wt/Len (l…
12.60
Grade
L-80
Top Thread
IBTM
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
7,951.4 6,037.9 45.08 PACKER 2RH ZXP w/HD LINER TOP PACKER 4.310
7,970.0 6,051.0 45.08 HANGER DG FLEX-LOCK LINER HANGER 4.400
7,979.8 6,058.0 45.08 SBE BAKER SEAL BORE EXTENSION 4.000
Tubing Strings
Tubing Description
TUBING WO
String Ma…
3 1/2
ID (in)
2.99
Top (ftKB)
31.1
Set Depth (ft…
7,987.9
Set Depth (TVD) (…
6,063.7
Wt (lb/ft)
9.30
Grade
L-80
Top Connection
EUE 8rd AB
Mod
Completion Details
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Item Des Com
Nominal
ID (in)
31.1 31.1 0.08 HANGER CIW GEN IV TUBING HANGER w/ Type 'H' Profile 2.992
508.1 508.1 0.38 NIPPLE CAMCO DS NIPPLE 3.5" x 2.875" 2.875
7,901.7 6,002.8 45.10 NIPPLE CAMCO 3.5" x 2.812" DS NIPPLE SN: T070815 2.812
7,950.4 6,037.2 45.08 LOCATOR BAKER GBH LOCATOR sub w/ 7-ft Space out 2.992
7,959.1 6,043.3 45.08 SEAL ASSY Baker 80-40 Seals 2.990
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (ftKB)
Top (TVD)
(ftKB)
Top Incl
(°) Des Com Run Date ID (in) SN
7,920.0 6,015.7 45.09 Liner Top Packer Northern Solutions PTSA Liner Top Packer w/
1.781" R Nipple. 9.79' OAL Length. (2.31" G F/N
to Pull assembly) Stung into liner top @ 7930'
RKB
4/16/2020 1.781
7,930.0 6,022.8 45.09 CTD Liner CTD Liner top from 3O-04L1-01 4/10/2020 1.920
8,663.0 6,549.7 42.97 WHIPSTOCK 2.63" OD BAKER GEN 2, 3-1/2" X 4-1/2"
WHIPSTOCK, -1.5° LOHS, RA TAG AT 8670.4'
12/29/2019 1.000
8,694.0 6,572.4 42.89 Fish SLIP STOP CATCHER SUB FISH. 1/2 OF A
SLIP, 2 FULL SLIPS, SLIP RETAINER RING &
2.70" X 30" CATCHER.
10/24/2018 0.000
Perforations & Slots
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Linked Zone Date
Shot
Dens
(shots/ft
)Type Com
8,622.0 8,640.0 6,519.7 6,532.9 C-4, C-1, UNIT
B, 3O-04
5/7/1989 12.0 CMT SQZ 2 1/8" EnerJet, 60 deg.
phasing -- Squeezed behind
4-1/2" liner during 2013
RWO
8,653.0 8,669.0 6,542.4 6,554.1 A-3, 3O-04 5/7/1989 12.0 CMT SQZ 2 1/8" EnerJet, 60 deg.
phasing -- Squeezed behind
4-1/2" liner during 2013
RWO
8,675.0 8,695.0 6,558.5 6,573.1 A-1, 3O-04 1/5/2015 6.0 APERF 2.5" 6SPF, 60 DEGREE
PHASING, DEEP
penetrating chgs
8,675.0 8,695.0 6,558.5 6,573.1 A-1, 3O-04 8/8/2016 6.0 APERF 2.5'" POWERJET OMEGA
CHARGES 6 SPF, 60 DEG
PHASING
8,675.0 8,698.0 6,558.5 6,575.3 A-2, 3O-04 5/7/1989 12.0 CMT SQZ 2 1/8" EnerJet, 60 deg.
phasing -- Squeezed behind
4-1/2" liner during 2013
RWO
8,675.0 8,695.0 6,558.5 6,573.1 A-2, 3O-04 7/18/2013 6.0 APERF 3-3/8" OD 6 SPF
MILLENNIUM 60 DEG
PHASING 25gr HMX
8,710.0 8,730.0 6,584.1 6,598.8 A-1, 3O-04 9/25/1988 8.0 CMT SQZ 4 1/2" HSD Csg Gun, 45
deg. phasing -- Squeezed
behind 4-1/2" liner during
2013 RWO
Cement Squeezes
Top (ftKB) Btm (ftKB)
Top (TVD)
(ftKB)
Btm (TVD)
(ftKB) Des Start Date Com
7,950.0 8,850.0 6,036.9 6,686.8 LINER CMT 7/15/2013
Mandrel Inserts
St
ati
on
N
o/Top (ftKB)
Top (TVD)
(ftKB) Make Model OD (in) Serv
Valve
Type
Latch
Type
Port Size
(in)
TRO Run
(psi) Run Date Com
1 3,098.4 2,599.8 WTF KBMG 1 GAS LIFT GLV BK 0.156 1,329.0 12/11/2019
2 4,760.7 3,787.1 WTF KBMG 1 GAS LIFT GLV BK 0.188 1,354.0 12/11/2019
3 6,117.1 4,747.2 WTF KBMG 1 GAS LIFT OV BK 0.250 0.0 12/10/2019
4 7,166.4 5,485.2 WTF KBMG 1 GAS LIFT DMY BK 0.000 0.0 5/14/2019
5 7,843.2 5,961.6 WTF KBMG 1 GAS LIFT DMY BK 0.000 0.0 11/18/2014
3O-04, 5/12/2020 11:57:33 AM
Vertical schematic (actual)
CTD Liner; 7,930.0
PRODUCTION; 33.0-8,961.3
LINER; 7,951.4-8,850.0
CMT SQZ; 8,710.0-8,730.0
Fish; 8,694.0
CMT SQZ; 8,675.0-8,698.0
APERF; 8,675.0-8,695.0
APERF; 8,675.0-8,695.0
APERF; 8,675.0-8,695.0
WHIPSTOCK; 8,663.0
CMT SQZ; 8,653.0-8,669.0
CMT SQZ; 8,622.0-8,640.0
Liner Cement; 7,950.0 ftKB
SEAL ASSY; 7,959.1
LOCATOR; 7,950.4
Liner Top Packer; 7,920.0
NIPPLE; 7,901.6
GAS LIFT; 7,843.2
GAS LIFT; 7,166.4
GAS LIFT; 6,117.1
SURFACE; 35.0-5,099.2
GAS LIFT; 4,760.7
GAS LIFT; 3,098.4
NIPPLE; 508.1
CONDUCTOR; 35.0-115.0
HANGER; 31.1
KUP PROD
KB-Grd (ft)
40.00
Rig Release Date
7/9/1988
3O-04
...
TD
Act Btm (ftKB)
8,984.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292182600
Wellbore Status
PROD
Max Angle & MD
Incl (°)
51.60
MD (ftKB)
2,600.00
WELLNAME WELLBORE3O-04
Annotation
Last WO:
End Date
7/21/2013
H2S (ppm)
140
Date
9/25/2013
Comment
SSSV:NIPPLE
Notes: General & Safety
End Date Annotation
10/31/2018 Note: Unable to locate mandrels @ 7166 & 7832' RKB
1/27/2016 NOTE: MILLED RESIN TO 8,730 CTMD = COMPLETE
10/2/2015 NOTE: Pumped SANDLOCK-V resin frac with 8-PPA Jordan Unimin sand, 8.9-BPM, 5000-psi.
3O-04, 5/12/2020 11:57:33 AM
Vertical schematic (actual)
CTD Liner; 7,930.0
PRODUCTION; 33.0-8,961.3
LINER; 7,951.4-8,850.0
CMT SQZ; 8,710.0-8,730.0
Fish; 8,694.0
CMT SQZ; 8,675.0-8,698.0
APERF; 8,675.0-8,695.0
APERF; 8,675.0-8,695.0
APERF; 8,675.0-8,695.0
WHIPSTOCK; 8,663.0
CMT SQZ; 8,653.0-8,669.0
CMT SQZ; 8,622.0-8,640.0
Liner Cement; 7,950.0 ftKB
SEAL ASSY; 7,959.1
LOCATOR; 7,950.4
Liner Top Packer; 7,920.0
NIPPLE; 7,901.6
GAS LIFT; 7,843.2
GAS LIFT; 7,166.4
GAS LIFT; 6,117.1
SURFACE; 35.0-5,099.2
GAS LIFT; 4,760.7
GAS LIFT; 3,098.4
NIPPLE; 508.1
CONDUCTOR; 35.0-115.0
HANGER; 31.1
KUP PROD 3O-04
...
WELLNAME WELLBORE3O-04
Casing Strings
Casing Description
Liner L1 Lateral
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
9,451.5
Set Depth (ftKB)
11,874.0
Set Depth (TVD) …
6,587.5
Wt/Len (l…
4.60
Grade
L-80
Top Thread
STL
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
9,451.5 6,617.7 84.23 Aluminum
Billet
Aluminum Liner Top Billet 1.920
10,228.6 6,644.6 92.29 Deployment
Sleeve
Shorty Deployment Sleeve 1.000
3O-04L1, 5/12/2020 11:58:50 AM
Vertical schematic (actual)
Liner L1 Lateral; 9,451.5-
11,874.0
PRODUCTION; 33.0-8,961.3
LINER; 7,951.4-8,850.0
Liner L1-01; 7,930.5-12,035.2
Liner Cement; 7,950.0 ftKB
CTD Liner; 7,930.0
SEAL ASSY; 7,959.1
LOCATOR; 7,950.4
Liner Top Packer; 7,920.0
NIPPLE; 7,901.6
GAS LIFT; 7,843.2
GAS LIFT; 7,166.4
GAS LIFT; 6,117.1
Annular Fluid - Seawater;
2,500.0-7,931.0
SURFACE; 35.0-5,099.2
GAS LIFT; 4,760.7
GAS LIFT; 3,098.4
Annular Fluid - Diesel; 0.0-
2,500.0
NIPPLE; 508.1
CONDUCTOR; 35.0-115.0
HANGER; 31.1
KUP PROD
KB-Grd (ft)
40.00
Rig Release Date
7/9/1988
3O-04L1
...
TD
Act Btm (ftKB)
11,874.0
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292182660
Wellbore Status
PROD
Max Angle & MD
Incl (°)
99.53
MD (ftKB)
11,714.70
WELLNAME WELLBORE3O-04
Annotation End DateH2S (ppm)
140
Date
9/25/2013
Comment
Casing Strings
Casing Description
Liner L1-01
OD (in)
2 3/8
ID (in)
1.99
Top (ftKB)
7,930.5
Set Depth (ftKB)
12,035.2
Set Depth (TVD) …
6,676.1
Wt/Len (l…
4.70
Grade
L-80
Top Thread
ST-L
Liner Details
Top (ftKB) Top (TVD) (ftKB) Top Incl (°) Item Des Com
Nominal ID
(in)
7,930.5 6,023.5 45.08 SBR NSAK, 225 Seal Bore Receptical, (2.25") 2.250
8,621.0 6,519.4 43.36 Deployment
Sleeve
NSAK 350-238, QCLL Receptical- L80 1.920
10,371.4 6,580.1 91.61 Deployment
Sleeve
NSAK 350-238, QCLL Receptical- L80 1.920
3O-04L1-01, 5/12/2020 12:04:24 PM
Vertical schematic (actual)
Liner L1-01; 7,930.5-12,035.2
PRODUCTION; 33.0-8,961.3
CTD Liner; 7,930.0
Liner Top Packer; 7,920.0
NIPPLE; 7,901.6
GAS LIFT; 7,843.2
GAS LIFT; 7,166.4
GAS LIFT; 6,117.1
Annular Fluid - Seawater;
2,500.0-7,931.0
SURFACE; 35.0-5,099.2
GAS LIFT; 4,760.7
GAS LIFT; 3,098.4
Annular Fluid - Diesel; 0.0-
2,500.0
NIPPLE; 508.1
CONDUCTOR; 35.0-115.0
HANGER; 31.1
KUP PROD
KB-Grd (ft)
40.00
Rig Release Date
7/9/1988
3O-04L1-01
...
TD
Act Btm (ftKB)
12,035.2
Well Attributes
Field Name
KUPARUK RIVER UNIT
Wellbore API/UWI
500292182661
Wellbore Status
PROD
Max Angle & MD
Incl (°)
95.22
MD (ftKB)
10,016.96
WELLNAME WELLBORE3O-04
Annotation End DateH2S (ppm)
140
Date
9/25/2013
Comment
Page 1/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/25/2020
00:00
3/25/2020
02:00
2.00 MIRU MOVE MOB P Phase1 on spine rd. Phase 2 on
access roads and pads
Rig and ancillary equipment on
location. Stage light plants and heater
while dropping off jeeps. Loader
dressed far end of pad for Shop & 1/2
way house.
0.0 0.0
3/25/2020
02:00
3/25/2020
03:30
1.50 MIRU MOVE MOB P Prep well head, remove snow, lay pit
liner, stage mats and lay plywood
around cellar.
0.0 0.0
3/25/2020
03:30
3/25/2020
05:00
1.50 MIRU MOVE MOB P Set 1/2 way house and mats and
plywood, spot shop
0.0 0.0
3/25/2020
05:00
3/25/2020
06:48
1.80 MIRU MOVE MOB P Pull pits forward and stage out of way,
Spot Sub over well, crew change,
continue to spot sub, come off jack.
0.0 0.0
3/25/2020
06:48
3/25/2020
07:12
0.40 MIRU MOVE MOB P Spot inner mats, 0.0 0.0
3/25/2020
07:12
3/25/2020
08:18
1.10 MIRU MOVE MOB P Move pits, spot up, set outer mats,
come off jack
0.0 0.0
3/25/2020
08:18
3/25/2020
10:24
2.10 MIRU WHDBOP RURD P Work rig up checklist 0.0 0.0
3/25/2020
10:24
3/25/2020
11:24
1.00 MIRU WHDBOP NUND P Nipple up stack and gather RKB's. 0.0 0.0
3/25/2020
11:24
3/25/2020
12:24
1.00 MIRU WHDBOP RURD P Continue to work RU check list, start
to inventory pits, grease rig valves /
stack. Valve crew called out to grease
tree valves, stand by until swab test as
contingency.
0.0 0.0
3/25/2020
12:24
3/25/2020
15:00
2.60 MIRU WHDBOP RURD P Fluid pack and shell test to 4000 psi -
good
0.0 0.0
3/25/2020
15:00
3/25/2020
15:18
0.30 MIRU WHDBOP BOPE P Start BOT test 250/4000 psi 2500 psi
annular test winessed Brian Bixby,
0.0 0.0
3/25/2020
15:18
3/25/2020
15:36
0.30 MIRU WHDBOP BOPE T test 1. Swab 2 - fail 0.0 0.0
3/25/2020
15:36
3/25/2020
22:00
6.40 MIRU WHDBOP BOPE P Test 2. Blind/Shear, BOP TV2, Charlie
4, 5, 8, &12
Test 3. BOP TV 1, Charlie 3, 7, & 11
Test 4. Manual choke D & Super
choke C
Test 5. Romeo 3, Bleeder 3, Tango 2,
Charlie 2, & 10
Test 6. Charlie 1, 9, Bravo 5, and
Tango 1 – install TIW test joint
Test 7. Lower 2” pipe slip rams, TIW
#1, Romeo 1, Bleeder 1
Test 8. Annular BOP
Test 9. Upper 2” pipe slip rams, Bravo
6, & 8
Test 10. Bravo 7 – swap out 2” test
joint for 2-3/8”
Test 11. 2-3/8” pipe slip rams, TIW#2
– check N2 levels, swap to 2” test joint
Test 12. Draw down accumulator
Test 13. Stab injector and line up to
reverse circulate coil, test inner reel
valve and stripper.
Tested all gas detectors, pits, cellar,
Verified flow alarms - PVT
0.0 0.0
3/25/2020
22:00
3/25/2020
22:30
0.50 MIRU WHDBOP PRTS P Install nozzle, blow down choke,
inspect pack offs
0.0 0.0
3/25/2020
22:30
3/25/2020
23:00
0.50 MIRU WHDBOP PRTS P Re-test swab #2 (fail), call out grease
crew for re-grease
0.0 0.0
Rig: NABORS CDR3-AC
Page 2/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/25/2020
23:00
3/26/2020
00:00
1.00 MIRU WHDBOP PRTS P Call out KDTH, replace failed tiger
tank manifold block valve, test tiger
tank line, ODS PDL (good)
0.0 0.0
3/26/2020
00:00
3/26/2020
01:30
1.50 MIRU WHDBOP PRTS P Re-test Swab #2 (pass), test DS PDL
(good)
0.0 0.0
3/26/2020
01:30
3/26/2020
02:00
0.50 MIRU WHDBOP PRTS P Brake off PDL, blow down test pump,
and RD all testing equipment.
0.0 0.0
3/26/2020
02:00
3/26/2020
03:30
1.50 PROD1 WHPST PULD P PJSM, PU/MU/PD milling assembly 0.0 76.9
3/26/2020
03:30
3/26/2020
03:57
0.45 PROD1 WHPST PULD P Surface test CoilTrak tools (good), tag
up, reset counters
76.9 76.9
3/26/2020
03:57
3/26/2020
05:45
1.80 PROD1 WHPST TRIP P RIH, w/milling assembly BHA #1
Weatherford 1.0° ako motor, pumping
seawater min rate, WHP 1,187,
IA=561, OA=538
76.9 8,355.0
3/26/2020
05:45
3/26/2020
05:57
0.20 PROD1 WHPST DLOG P Log formation for depth correction of -
16'
8,348.0 8,396.0
3/26/2020
05:57
3/26/2020
07:39
1.70 PROD1 WHPST DISP P Flush well with seawater, bottoms up,
Roll hole to Duo / Pro, bottoms up
Park - close EDC - observe pressure
at 6359 sensor depth.
Bleed into BHP of 3877 psi for 11.7
ppg EMW
8,396.0 8,448.0
3/26/2020
07:39
3/26/2020
07:57
0.30 PROD1 WHPST TRIP P RIH, try tag pinch point@ 8662.2', PU
Wt 44 k lbs
Set rate, RBIH
Choke acting up, decent amount of
solids shoing up on the shaker.
8,448.0 8,662.0
3/26/2020
07:57
3/26/2020
10:45
2.80 PROD1 WHPST MILL P CT 4241 psi @ 1.86 bpm in/out, 3957
psi BHP T RIH Wt 18.7 k lbs
Stick slip issues, 8662.9' WOB to 1 k,
and again @ 8663.1' WOB to 1.8 k
lbs.
Mix new mud with additional 1% 776,
pump 10 bbl sweep, see coil WT
increase from 17.4 to 18.4 k lbs, best
effect with sweep high on the back
side 4000 - 1000' from surface.
Bleed IA and OA from ~ 1000 psi to
417 and 160 psi respectively
8,662.0 8,664.9
3/26/2020
10:45
3/26/2020
12:39
1.90 PROD1 WHPST MILL P WOB rapidly climbed from 2 k to 2.3 k
lbs, Parked stick as 10 bbl sweep was
on the back side and 1 k of CT weight
stacked up. Reengaged stick at 1 ft/hr
Mill ahead
8,664.9 8,667.1
3/26/2020
12:39
3/26/2020
13:51
1.20 PROD1 WHPST MILL P WOB rapidly climbed from 2 k to 2.4 k
lbs while milling at 1 ft/hr.
WOB rapidly fell off - BOW 8667.1'
Adding pinch - 7.2' window
8,667.1 8,668.6
3/26/2020
13:51
3/26/2020
14:39
0.80 PROD1 WHPST MILL P Drill ahead in formation.
8675' PU Wt
Dril to TD PU 44 k lbs
8,668.6 8,685.0
3/26/2020
14:39
3/26/2020
16:45
2.10 PROD1 WHPST REAM P Perform reaming pases, as milled, 30
L 30R, and 180 from as milled -
highside.
8,685.0 8,553.0
3/26/2020
16:45
3/26/2020
18:15
1.50 PROD1 WHPST TRIP P POOH 8,553.0 76.9
3/26/2020
18:15
3/26/2020
19:15
1.00 PROD1 WHPST PULD P PUD & LD milling assembly, inspect,
obtain pictures of mils, gauge 2.79" no
-go
76.9 0.0
3/26/2020
19:15
3/26/2020
19:33
0.30 PROD1 WHPST CTOP P Install nozzle, stab INJH, jet stack,
unstab INJH, brake off nozzle
0.0 0.0
3/26/2020
19:33
3/26/2020
20:51
1.30 PROD1 DRILL PULD P PD, kickoff/drilling assembly BHA #2,
surface test tools (good)
0.0 72.2
Rig: NABORS CDR3-AC
Page 3/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/26/2020
20:51
3/26/2020
22:33
1.70 PROD1 DRILL TRIP P Tag up, reset counters, RIH 72.2 8,355.0
3/26/2020
22:33
3/26/2020
22:45
0.20 PROD1 DRILL DLOG P Log formation (K1) -13.0' 8,355.0 8,400.0
3/26/2020
22:45
3/26/2020
22:57
0.20 PROD1 DRILL TRIP P Continue IH 8,400.0 8,636.0
3/26/2020
22:57
3/26/2020
23:15
0.30 PROD1 DRILL TRIP P Perform perssure survey above
window,
22:55 - AP= 4,135. EMW= 12.39 ppg
23:00 - AP= 4,091, EMW= 12.22 ppg
23:05 - AP= 3,973, EMW= 11.80 ppg
23:10 - AP= 3,984, EMW= 11.84 ppg
Bleed 100 WHP
23:15 - AP= 3,948, EMW= 11.693 ppg
Bleed 100 WHP
23:20 - AP= 3,931, EMW= 11.643 ppg
8,636.0 8,636.0
3/26/2020
23:15
3/26/2020
23:27
0.20 PROD1 DRILL TRIP P Pass through the window clean, bring
pump up to rate, 1.83 bpm @ 4,006
psi, DIff=440, BHP=4,125, IA=413,
OA=188
8,636.0 8,695.0
3/26/2020
23:27
3/26/2020
23:39
0.21 PROD1 DRILL TRIP T No WOB noticed, PUH clean 43k,
RBIH down to 8,698', PUH phone
town team.
8,695.0 8,698.0
3/26/2020
23:39
3/26/2020
23:51
0.20 PROD1 DRILL DLOG P Log RA marker 8,671', continue IH
logging RES and near bit.
8,698.0 8,702.0
3/26/2020
23:51
3/27/2020
00:00
0.15 PROD1 DRILL TRIP P PUH above WS, wait on decision
forward
8,702.0 8,702.0
3/27/2020
00:00
3/27/2020
01:18
1.30 PROD1 DRILL CIRC T Above Window, recip pipe, circulating
1.2 bpm WOO
8,702.0 8,619.0
3/27/2020
01:18
3/27/2020
01:54
0.60 PROD1 DRILL CIRC T Circulate 5x5 sweep, pump BU,
sample (frac-sand)
8,619.0 8,619.0
3/27/2020
01:54
3/27/2020
02:06
0.20 PROD1 DRILL DRLG T RIH, 1.82 bpm @ 4,030 psi, Diff=420,
attempt to find bottom down to 8,707',
8,619.0 8,707.0
3/27/2020
02:06
3/27/2020
02:42
0.60 PROD1 DRILL WPRT T pull wiper up hole w/sweep, PUW 43
K
8,707.0 8,586.0
3/27/2020
02:42
3/27/2020
03:12
0.50 PROD1 DRILL CIRC T Circulate BU, sample (frac-sand),
build addtional sweeps in pits.
continue circulating BU
8,586.0 8,580.0
3/27/2020
03:12
3/27/2020
03:24
0.20 PROD1 DRILL TRIP T RBIH, 1.87 bpm at 4,056 psi, Diff=460,
set down @ 8,614' 6k DHWOB
8,580.0 8,614.0
3/27/2020
03:24
3/27/2020
03:42
0.30 PROD1 DRILL WPRT T Pull wiper up hole to TT, pumping 1.8
bpm at 3,900 psi, pull heavy 8,523',
RBIH to 8,550', PBUH, clean continue
wiper up hole to TT.
8,614.0 8,100.0
3/27/2020
03:42
3/27/2020
04:12
0.50 PROD1 DRILL TRIP T RBIH, 1.87 bpm at 4,056 psi, Diff=460,
set down @ 8,715' 1.5k DHWOB
8,100.0 8,715.0
3/27/2020
04:12
3/27/2020
04:30
0.30 PROD1 DRILL WPRT T Pull wiper above widnow wtih sweep,
pull heavy -12 k, temporily detained
pull 50k @ 8,585', work pipe, open
choke bleed WHP in tention, popped
free,
8,715.0 8,585.0
3/27/2020
04:30
3/27/2020
05:24
0.90 PROD1 DRILL WPRT T Continue Wiper up hole, PUW 37 k
Pull heavy 8558-8577' Stack out,
work pipe free -
8,585.0 7,837.0
3/27/2020
05:24
3/27/2020
06:48
1.40 PROD1 DRILL TRIP T POOH for cklean out run- bottoms up,
Open EDC -
7,837.0 52.0
3/27/2020
06:48
3/27/2020
07:42
0.90 PROD1 DRILL PULD T Bump up, PUD BHA #2
Bit graded out 1-3-BT chipped
reamers
52.0 0.0
3/27/2020
07:42
3/27/2020
08:36
0.90 PROD1 DRILL PULD T PD BHA #3 - clean out assembly 1°
fixed motor w D331 ridge set
Tag up, set depth
0.0 55.0
Rig: NABORS CDR3-AC
Page 4/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/27/2020
08:36
3/27/2020
10:00
1.40 PROD1 DRILL PULD T RIH 55.0 8,355.0
3/27/2020
10:00
3/27/2020
10:12
0.20 PROD1 DRILL DLOG T Tie into the K1 for a -15' correction 8,355.0 8,380.0
3/27/2020
10:12
3/27/2020
12:18
2.10 PROD1 DRILL WASH T Close EDC, set rate 1.89 bpm, free
spin diff 580
RIH to 8675, WOB to 2.5 - PU Wt 40 k
Pull up though the window -clean
RBIH to 8716.6 WOB to 190 lbs PU
41 k lbs, tried to pack off, RBIH pull up
slowly and clean through window.
RBIH to 8716.6', WOB 4.1k lbs PUH
clean
RBIH to 8715' WOB2.8 k PU 41 k
clean- PUH through window clean
Chase sweeps out of hole - seeing
reduced solids to surface over time.
RBIH and dry tag 8718' 8 k WOB - PU
Wt 40 clean
8,355.0 8,711.0
3/27/2020
12:18
3/27/2020
12:42
0.40 PROD1 DRILL TRIP T PUH to log 8,711.0 8,354.0
3/27/2020
12:42
3/27/2020
12:54
0.20 PROD1 DRILL TRIP T Tie into K1 for +1' 8,354.0 8,378.0
3/27/2020
12:54
3/27/2020
13:18
0.40 PROD1 DRILL DRLG T RBIH
Slight WOB spike @ 8661'
CT 4216 psi @ 1.88 bpm, 576 free
spin, motor work at 8715.4'
Mill/Drill ahead 1 foot, 733 psi diff and
WOB to 1.9 k lbs park
Mill/Drill ahead 1 more foot with 802
psi diff and WOB 2.6 k lbs
8,378.0 8,717.4
3/27/2020
13:18
3/27/2020
14:48
1.50 PROD1 DRILL TRIP T PU Wt 44 k lbs POOH,
More sand showing up at 3000' cut
pulling speed and send 5x5 sweep
POOH, Bump up, space out
8,717.4 46.0
3/27/2020
14:48
3/27/2020
16:18
1.50 PROD1 DRILL TRIP T PUD BHA #3, clean out assembly, 46.0 0.0
3/27/2020
16:18
3/27/2020
17:06
0.80 PROD1 DRILL TRIP T PD BHA #4 - Build drillig assembly #2,
2.55 ° AKO over a RR P104
0.0 72.2
3/27/2020
17:06
3/27/2020
18:36
1.50 PROD1 DRILL TRIP T RIH 72.2 8,355.0
3/27/2020
18:36
3/27/2020
18:48
0.20 PROD1 DRILL DLOG T Log formation for depth - 13.0' 8,355.0 8,375.0
3/27/2020
18:48
3/27/2020
19:06
0.30 PROD1 DRILL TRIP T Continue IH 8,375.0 8,685.0
3/27/2020
19:06
3/27/2020
19:18
0.20 PROD1 DRILL DLOG T Tie in RA for offical window depths @
8,669.5', continue IH to bottom
8,685.0 8,718.0
3/27/2020
19:18
3/27/2020
19:30
0.20 PROD1 DRILL TRIP T PUH to confrim window area (clean) 8,718.0 8,646.0
3/27/2020
19:30
3/27/2020
20:00
0.50 PROD1 DRILL DRLG T RBIH to bottom, bring pump online
1.82 bpm at 4,111 psi, Diff=504,
WHP=574, BHP=4,156, IA=816,
OA=218, drill ahead from 8,718', stall
motor muliple times 8,718'-8,725'
8,646.0 8,725.0
3/27/2020
20:00
3/27/2020
20:24
0.40 PROD1 DRILL DRLG T BOB attempting to get 1.82 bpm at
4,012 psi, Diff=575, WHP=574,
BHP=4,156, IA=816, OA=218,
8,725.0 8,000.0
3/27/2020
20:24
3/27/2020
20:48
0.40 PROD1 DRILL TRIP T PUH, confir with TE, circulate sweeps,
pull to the above window, addtional
sweep exiting the bit, continue pulling
to the TT, RBIH, to above window
open EDC
8,000.0 8,646.0
3/27/2020
20:48
3/27/2020
21:24
0.60 PROD1 DRILL TRIP T POOH, pumping max rate, change of
plans
8,646.0 6,826.0
Rig: NABORS CDR3-AC
Page 5/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/27/2020
21:24
3/27/2020
22:00
0.60 PROD1 DRILL TRIP T RBIH to above window for displacing
well to KWF
6,826.0 8,655.0
3/27/2020
22:00
3/27/2020
22:39
0.65 PROD1 DRILL CTOP T Perfrom static pressure survey @
8,655.7'
Perform perssure survey above
window,
22:00 - AP= 4,254. EMW= 12.68 ppg
22:05 - AP= 4,218, EMW= 12.59 ppg
22:10- AP= 4,195, EMW= 12.51 ppg
22:15 - AP= 4,173, EMW= 12.44 ppg
22:20 - AP= 4,152, EMW= 12.39 ppg
22:25 - AP= 4,136, EMW= 12.18 ppg
Bleed 250 WHP
22::30 - AP= 3,962, EMW= 11.82 ppg
Bleed 250 WHP
22:38 - AP=3939, EMW= 11.641 ppg
8,655.0 8,655.0
3/27/2020
22:39
3/28/2020
00:00
1.35 PROD1 DRILL CIRC T Recip pipe, while waiting on Vac Truck
support
8,655.0 8,539.0
3/28/2020
00:00
3/28/2020
02:00
2.00 PROD1 DRILL CIRC T Continue recip pipe, transferring fluid
for displacement, RBIH to bottom
8,655'
8,539.0 8,413.0
3/28/2020
02:00
3/28/2020
02:30
0.50 PROD1 DRILL CIRC T Circulate 12.0 ppg completion fluid
down coil,
8,413.0 8,655.0
3/28/2020
02:30
3/28/2020
04:18
1.80 PROD1 DRILL TRIP T POOH, displacing well to completion
fluid
8,655.0 54.0
3/28/2020
04:18
3/28/2020
05:12
0.90 PROD1 DRILL PULD T At surface, flow check - good, LD BHA
#4 over a dead well.
54.0 0.0
3/28/2020
05:12
3/28/2020
05:30
0.30 PROD1 DRILL PUTB T PU L1-PB1, 3 joints of 2-3/8" ST-L
slotted liner wish a solid bull nose
under a shorty deployment sleve.
0.0 90.0
3/28/2020
05:30
3/28/2020
06:30
1.00 PROD1 DRILL PULD T PU BHA #5, L1-PB1 running
assembly. Crew change, Stab on,
bump up and set counters.
90.0 137.0
3/28/2020
06:30
3/28/2020
08:00
1.50 PROD1 DRILL RUNL T RIH with L1-PB1 completion 137.0 8,427.0
3/28/2020
08:00
3/28/2020
08:12
0.20 PROD1 DRILL DLOG T tie into the K1 for a -16' correction 8,427.0 8,448.6
3/28/2020
08:12
3/28/2020
08:30
0.30 PROD1 DRILL RUNL T Close EDC, PU Wt 42 k lbs RIH
Window clean, stack out at 8721' SEt
between 6.5 and 8.4 k WOB 3 times.
PU Wts 42 k lsbs clean. STack 9.6 k
WOB, pump down coil while stacked,
no change, PU and attempr to RBIH
again, same bottom
8,448.6 8,721.0
3/28/2020
08:30
3/28/2020
08:54
0.40 PROD1 DRILL RUNL T PU and consult with TE. RBIH,
Work pipe to 10 k WOB with choke
close, edc to 14 ppg EMW
No sucess breaking down suspect
bridge
8,721.0 8,721.0
3/28/2020
08:54
3/28/2020
10:30
1.60 PROD1 DRILL PULL T PUH, open EDC, POOH 8,721.0 153.0
3/28/2020
10:30
3/28/2020
10:54
0.40 PROD1 DRILL PULD T LD BHA #5 153.0 90.0
3/28/2020
10:54
3/28/2020
11:12
0.30 PROD1 DRILL PULL T remove one joint from completion,
new L1-PB1 - 2 joints of 2-3/8" STL
with a non ported bullnose under a
shorty. LOA 62.05'
90.0 60.0
3/28/2020
11:12
3/28/2020
11:36
0.40 PROD1 DRILL PULD T PU BHA #6, L1 60.0 106.0
3/28/2020
11:36
3/28/2020
13:06
1.50 PROD1 DRILL RUNL T RIH W BHA #6 - L1-PB1 completion 106.0 8,400.0
3/28/2020
13:06
3/28/2020
13:18
0.20 PROD1 DRILL DLOG T Tie into the K1 for a -16' correction 8,400.0 8,432.0
Rig: NABORS CDR3-AC
Page 6/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/28/2020
13:18
3/28/2020
13:30
0.20 PROD1 DRILL RUNL T Close EDC, PU Wt 41 k lbs, RIH to set
depth
Find bottom at 8718' PU Wt 41 k
WOB to -3.7 k lbs
RBIH, set liner on bottom, pump 1.5
bpm diff pressure 1200 psi
PU wt 41 k lsb WOB -3.0 k lbs, park
and reset depth, open EDC
8,432.0 8,623.0
3/28/2020
13:30
3/28/2020
14:48
1.30 PROD1 DRILL TRIP T POOH 8,623.0 67.0
3/28/2020
14:48
3/28/2020
15:24
0.60 PROD1 DRILL PULD T Flow check, LDBHA #7 over a dead
well.
67.0 0.0
3/28/2020
15:24
3/28/2020
16:06
0.70 PROD1 WHPST PULD T PU BHA #7 BOT 3.5" x 4.5" WS
setting assembly.
0.0 75.0
3/28/2020
16:06
3/28/2020
17:42
1.60 PROD1 DRILL TRIP T RIH, 0.0 8,363.0
3/28/2020
17:42
3/28/2020
17:54
0.20 PROD1 DRILL DLOG T Log formation for depth -13.0' 8,363.0 8,386.0
3/28/2020
17:54
3/28/2020
18:24
0.50 PROD1 DRILL TRIP T Continue IH to setting depth 8,632.12',
close EDC, bring pump up to shear
856 diff, 1,900 psi, 1.6 k DHWOB,
creep in hole stack out 3.7 k, PUH
PUW 39 k
8,386.0 8,620.0
3/28/2020
18:24
3/28/2020
19:54
1.50 PROD1 DRILL TRIP T POOH 8,620.0 74.9
3/28/2020
19:54
3/28/2020
20:18
0.40 PROD1 DRILL OWFF T At surface, check well for flow, PJSM 74.9 74.9
3/28/2020
20:18
3/28/2020
21:00
0.70 PROD1 DRILL PULD T LD settting tools ove a dead well 74.9 0.0
3/28/2020
21:00
3/28/2020
21:54
0.90 PROD1 WHPST PULD T PU window milling assembly, BHA #8 0.0 76.9
3/28/2020
21:54
3/28/2020
22:48
0.90 PROD1 WHPST TRIP T RIH 76.9 8,370.0
3/28/2020
22:48
3/28/2020
23:00
0.20 PROD1 WHPST DLOG T Log formation for depth control -14.0' 8,370.0 8,423.0
3/28/2020
23:00
3/28/2020
23:48
0.80 PROD1 WHPST DISP T Continue IH, 8,600' displace well to
milling fluid
8,423.0 8,600.0
3/28/2020
23:48
3/29/2020
00:00
0.20 PROD1 WHPST TRIP T RIH, dry tag Pinch Point @ 8622.8',
PUH obtain pump parameters.
8,600.0 8,622.8
3/29/2020
00:00
3/29/2020
02:00
2.00 PROD1 WHPST WPST T Begin milling ahead, 1.83 bpm at
4,060 psi, Diff=530, WHP=537,
BHP=4,120, IA=25, OA=194
8,622.8 8,624.3
3/29/2020
02:00
3/29/2020
03:00
1.00 PROD1 WHPST WPST T 1.85 bpm at 4,140 psi, Diff=673,
WHP=545, BHP=4,120, IA=25,
OA=194
8,624.3 8,625.0
3/29/2020
03:00
3/29/2020
04:30
1.50 PROD1 WHPST WPST T 1.85 bpm at 4,140 psi, Diff=673,
WHP=545, BHP=4,120, IA=25,
OA=194, notice WOB started
increasing steady from 8,626'
8,625.0 8,627.0
3/29/2020
04:30
3/29/2020
06:48
2.30 PROD1 WHPST WPST T 1.83 bpm at 4,202 psi, Diff=732,
WHP=550, BHP=4,130, IA=226,
OA=235
8,627.0 8,628.8
3/29/2020
06:48
3/29/2020
08:36
1.80 PROD1 WHPST WPST T 1.83 bpm at 4,202 psi, Diff=732,
WHP=536, BHP=4111
** Looks like BOW 8628.8'
8,628.8 8,629.0
3/29/2020
08:36
3/29/2020
09:30
0.90 PROD1 WHPST WPST T 1.83 bpm at 4,509 psi, Diff=992,
WHP=550, BHP=4,130, IA=226,
OA=235
8,629.0 8,630.8
3/29/2020
09:30
3/29/2020
10:06
0.60 PROD1 WHPST WPST T 1.83 bpm at 4,539 psi, Diff=943,
WHP=490, BHP=4125, IA=422,
OA=274
** Mill ahead
8,630.8 8,635.7
Rig: NABORS CDR3-AC
Page 7/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/29/2020
10:06
3/29/2020
11:36
1.50 PROD1 WHPST REAM T TD rat hole @ 8635' PU Wt 44 k lbs.
Perform reaming passes @ as milled,
30L & 30 R and 180 from as milled
(HS) from 8622' to 8631', Pump TD
sweep
8,635.7 8,619.0
3/29/2020
11:36
3/29/2020
13:36
2.00 PROD1 WHPST TRIP P Dry drift, - clean. Pump sweep out of
hole while PUH slowly, launch second
sweep, Open EDC, POOH pumping
2.2 bpm. Decent unload of metal At
~3000'. Micro Motion at 100% drive
gain.
8,619.0 57.0
3/29/2020
13:36
3/29/2020
14:42
1.10 PROD1 WHPST PULD P PUD BHA # 8, Window milling
assembly.
Mill and string reamer guaged out @
2.80 no go for both.
57.0 0.0
3/29/2020
14:42
3/29/2020
15:00
0.30 PROD1 DRILL CIRC P Stab injector and jet stack 0.0 0.0
3/29/2020
15:00
3/29/2020
15:48
0.80 PROD1 DRILL PULD P PD BHA # 9, Build #1 drilling
assembly - 2.4° AKO with RR
dynamus
RIH, Struggling with Choke B, Swap to
A., flush and inspect replace cone and
seat.
0.0 72.0
3/29/2020
15:48
3/29/2020
16:36
0.80 PROD1 DRILL TRIP P RIH 72.0 8,360.0
3/29/2020
16:36
3/29/2020
17:36
1.00 PROD1 DRILL DLOG P Log formaiton - 15.5' 8,360.0 8,388.0
3/29/2020
17:36
3/29/2020
17:48
0.20 PROD1 DRILL TRIP P Continue IH, pass through window
clean
8,388.0 8,636.0
3/29/2020
17:48
3/29/2020
18:00
0.20 PROD1 DRILL DRLG P OBD, 1.8 bpm at Diff=515 psi,
WHP=502, BHP=4,081, IA=191,
OA=239
8,636.0 8,641.0
3/29/2020
18:00
3/29/2020
18:30
0.50 PROD1 DRILL WPRT T Computers locked up, PUH off bottom
47 k, continue up hole throught the
window pumping 0.5 bpm clean, re-
boot computers (all good)
8,641.0 8,548.0
3/29/2020
18:30
3/29/2020
18:42
0.20 PROD1 DRILL WPRT P RBIH, HS TF stackout @ 8,624.5' 5k
DHWOB
8,548.0 8,624.5
3/29/2020
18:42
3/29/2020
19:00
0.30 PROD1 DRILL WPRT T PUH clean, atttemp to pass through
window x 7, 10 LOHS, 10 ROHS, 30
LOHS, 30 ROHS, no success, PU's
clean
8,624.5 8,624.5
3/29/2020
19:00
3/29/2020
19:12
0.20 PROD1 DRILL WPRT T Circulate 5x5 sweep, pull up hole
slowly pumping 1.8 bpm
8,624.5 8,500.0
3/29/2020
19:12
3/29/2020
19:24
0.20 PROD1 DRILL WPRT T RBIH, stackout @ 8,543', PUH, pulling
negitive 3.6k DHWOB, 1,500 k over
CTPUW, work pipe,
8,500.0 8,543.0
3/29/2020
19:24
3/29/2020
19:48
0.40 PROD1 DRILL WPRT T Continue POOH slowly, AP=4,500 psi,
bridge broke free @ 8,513', continue
up hole, atttempting to pack off x 5,
continue wiper to the TT, launch
addtional 5x5 sweeps.
8,543.0 7,987.0
3/29/2020
19:48
3/29/2020
20:00
0.20 PROD1 DRILL WPRT T Encounter packoff event, turn back
around and RBIH
7,987.0 8,280.0
3/29/2020
20:00
3/29/2020
20:15
0.25 PROD1 DRILL WPRT T Wiper back up hole enounter addtional
packoff events x 3,
8,280.0 8,246.0
3/29/2020
20:15
3/29/2020
20:27
0.20 PROD1 DRILL WPRT T Sweep at surface, choke plugged off,
line up to choke A, still packing off at
surface choke, work choke open and
close.
*** Note: Large pieces of debris at
shaker and in MM, 1/4-1 inch
resin/sand, Pictures on s:drive.
8,246.0 8,172.0
Rig: NABORS CDR3-AC
Page 8/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/29/2020
20:27
3/29/2020
21:33
1.10 PROD1 DRILL WPRT T RBIH, clean 4.5" with sweeps 8,172.0 8,600.0
3/29/2020
21:33
3/29/2020
22:57
1.40 PROD1 DRILL TRIP T Pull OH above TT, RBIH, open EDC,
POOH, right before tagup packed off
choke B, bi-pass choke
8,600.0 72.0
3/29/2020
22:57
3/30/2020
00:00
1.05 PROD1 DRILL PULD T At surface, PUD build assembly 72.0 0.0
3/30/2020
00:00
3/30/2020
01:12
1.20 PROD1 DRILL PULD T PD, cleanout assembly, tag up, reset
counters
0.0 62.4
3/30/2020
01:12
3/30/2020
02:48
1.60 PROD1 DRILL TRIP T RIH, with cleanout assembly BHA #10 62.4 8,360.0
3/30/2020
02:48
3/30/2020
03:00
0.20 PROD1 DRILL DLOG T Log formation for depth control -14.5' 8,360.0 8,373.0
3/30/2020
03:00
3/30/2020
04:30
1.50 PROD1 DRILL TRIP T Continue IH, pumping 1.80 bpm at
3,992 psi, Diff=430 psi, WHP=541,
BHP=4,125, IA=149, OA=231
8,627.3' - 1.0 k DHWOB with no set
down, continue IH to bottom 8,641.5' 5
k, pull wiper up to the BOW 8,629' w/
5x5 sweep, RBIH to bottom, launch
second 5x5 sweep, continue pulling to
the TT
8,373.0 8,641.5
3/30/2020
04:30
3/30/2020
05:12
0.70 PROD1 DRILL MILL T RBIH, thought window clean, drill
ahead from 8,640.5' to 8,643' @ 7 fph
1.80 bpm at 4,360 psi, Diff=304,
WHP=480, BHP=4,124, IA=305,
OA=256
8,641.5 8,643.0
3/30/2020
05:12
3/30/2020
05:48
0.60 PROD1 DRILL MILL T Clean up open hole, and cased hole
into 3.5" multiple sweeps, returns
cleaning up. Mostly sand, some
clumps.
8,643.0 7,945.0
3/30/2020
05:48
3/30/2020
06:42
0.90 PROD1 DRILL CIRC T RBIH, drift through window - clean, dry
tag bottom 8643' 4.7 K WOB.
PUH on the pump, clean through
window, back on pump, clean trip -
park and open EDC
7,945.0 8,597.0
3/30/2020
06:42
3/30/2020
08:24
1.70 PROD1 DRILL TRIP T POOH pumping 2.5 bpm - fan choke -
bit depth 4737 - 4598' sweeps at
surface. some large chunks, reduced
amount from previous.
8,597.0 42.0
3/30/2020
08:24
3/30/2020
09:30
1.10 PROD1 DRILL PULD T PUD BHA # 10,. Flush blow dow and
snake out MM.
Mill gauged out 2.78" No go.
42.0 0.0
3/30/2020
09:30
3/30/2020
10:24
0.90 PROD1 DRILL PULD T PD BHA # 11, Build assembly - 2.4 °
AKO w RR Dynamus from previous
attempt. Bump up, space out.
0.0 72.0
3/30/2020
10:24
3/30/2020
11:54
1.50 PROD1 DRILL TRIP T RIH 72.0 8,355.0
3/30/2020
11:54
3/30/2020
12:06
0.20 PROD1 DRILL TRIP T Tie for -14.5' 8,355.0 8,373.0
3/30/2020
12:06
3/30/2020
12:18
0.20 PROD1 DRILL TRIP T PU Wt 41 k lbs, Close EDC - RIH,
launch preemptive 5x5 sweep.
8,373.0 8,642.0
3/30/2020
12:18
3/30/2020
14:24
2.10 PROD1 DRILL DRLG P CT 4023 psi @ 1.83 bpm in, BHP
4051 psi, free spin 453 psi, WH 560
psi, IA 293 psi, OA 252 psi. CT RIH
Wt 16-18 k lbs. OBD, See WOB early
at 8,641', motor work at 8643'. Drill
ahead, Partial loss of returns @
8650', PU 44 k lbs WOB -3 k lbs,
torquing up, Clean up, RBIH. Drill
ahead choke cleaned up, ROP
increased to ~ 40 ft/hr. *** TD build
section #1 @ 8,697'
8,642.0 8,697.0
Rig: NABORS CDR3-AC
Page 9/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/30/2020
14:24
3/30/2020
14:54
0.50 PROD1 DRILL WPRT P PU Wt 42 k lbs
PUH on TD wiper
8,697.0 8,359.0
3/30/2020
14:54
3/30/2020
15:06
0.20 PROD1 DRILL DLOG P Tie into the K1for a +1 8,359.0 8,377.0
3/30/2020
15:06
3/30/2020
15:24
0.30 PROD1 DRILL DLOG P RBIH, window clean - WOB spike to
2.6 k lbs @ 8603
Log RA tag @ 8627.5
8,377.0 8,659.0
3/30/2020
15:24
3/30/2020
17:12
1.80 PROD1 DRILL TRIP P PUH, open EDC, POOH pumping 2.5
bpm, chasing sweeps
8,659.0 74.0
3/30/2020
17:12
3/30/2020
18:12
1.00 PROD1 DRILL PULD P At surface, tag up, spaceout, PUD
build assembly #1
74.0 0.0
3/30/2020
18:12
3/30/2020
19:30
1.30 PROD1 DRILL PULD P PU/PD, build assembly #2 0.0 72.2
3/30/2020
19:30
3/30/2020
21:42
2.20 PROD1 DRILL TRIP P RIH, @ 7,330', spike in WHP 1,100
psi, choke B plugged off switch to
choke A. bleed pressure down to
1,000 psi, free up and continue RIH
72.2 8,360.0
3/30/2020
21:42
3/30/2020
21:54
0.20 PROD1 DRILL DLOG P Log formation for depth, correction -
16.5'
8,360.0 8,388.0
3/30/2020
21:54
3/30/2020
22:06
0.20 PROD1 DRILL TRIP P Continue IH clean through window 8,388.0 8,697.0
3/30/2020
22:06
3/31/2020
00:00
1.90 PROD1 DRILL DRLG OBD, 1.84 bpm at 4,247 psi, Diff=522,
WHP=491, BHP=4,157, IA=270,
OA=242
8,697.0 8,875.0
3/31/2020
00:00
3/31/2020
02:12
2.20 PROD1 DRILL DRLG P OBD, 1.82 bpm at 4,424 psi, Diff=816,
WHP=467, BHP=4,193, IA=512,
OA=290
8,875.0 9,010.0
3/31/2020
02:12
3/31/2020
02:30
0.30 PROD1 DRILL WPRT P TD Build section @ 9,010', wiper up
hole w/5x5 sweep, pull through the
window, over pull down hole -5.2k @
8,621'
9,010.0 8,620.0
3/31/2020
02:30
3/31/2020
02:48
0.30 PROD1 DRILL WPRT T Continue pulling up hole allowing
sweep to get above
8,620.0 8,450.0
3/31/2020
02:48
3/31/2020
03:18
0.50 PROD1 DRILL WPRT T RBIH through window notice 2.3k
bobble at TOW 8,622', continue IH to
8,700', pull back up hole, over pull 1-
2k 8,646', turn around RBIH to bottom,
launch 5x5 sweep
8,450.0 9,000.0
3/31/2020
03:18
3/31/2020
04:00
0.70 PROD1 DRILL WPRT T PUH, PUW 40 k, continue wiper up
hole with 5x5 sweep, 8,622 - 3.5 k
DHWOB
9,000.0 8,600.0
3/31/2020
04:00
3/31/2020
06:30
2.50 PROD1 DRILL TRIP P POOH, pumping 1.8 bpm at 4,233 psi,
Diff=463, WHP=490, IA=587, OA=308
Jog near surface, circ bottoms up from
jog, park shallow, open EDC
8,600.0 51.0
3/31/2020
06:30
3/31/2020
07:18
0.80 PROD1 DRILL PULD P PUD, BHA # 12, 2nd stage build
assembly.
51.0 0.0
3/31/2020
07:18
3/31/2020
07:42
0.40 PROD1 DRILL BOPE P Vac stack and perform weekly BOP
function test - good
0.0 0.0
3/31/2020
07:42
3/31/2020
08:36
0.90 PROD1 DRILL PULD P PD BHA #13, NOV agitator over
hybrid motor with RB dyna pilot.
0.0 51.0
3/31/2020
08:36
3/31/2020
10:12
1.60 PROD1 DRILL TRIP P RIH
Park shallow, close EDC, test
1.0 bpm 421 psi diff - vibrations -
1/0
1.48 bpm 714 psi dff - vibrations -
2/0
1.81 bpm 1000 psi diff - vibrations -
2/0
51.0 8,366.0
3/31/2020
10:12
3/31/2020
10:24
0.20 PROD1 DRILL DLOG P Tie into the K1 for a -16' correction. 8,366.0 8,383.0
Rig: NABORS CDR3-AC
Page 10/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
3/31/2020
10:24
3/31/2020
10:48
0.40 PROD1 DRILL TRIP P Continue to RIH,
S/D in window 8624' 5.5 k lbs, PU
clean
Spin bit, RBIH, 2.5 k lbs WOB spike
slid through,
WOB spike 4.7 - 5.8 k @ 8658-8662'
8,366.0 9,010.0
3/31/2020
10:48
3/31/2020
13:48
3.00 PROD1 DRILL DRLG P CT 4669 psi @ 1.84 bpm WH 510 psi,
BHP 4195 psi, targeting 12.2 ppg
EMW at the window, 12.3 ppg @ the
bit. OBD, WOB 0.5 k lbs, ROP up to
240 ft/hr.
Drill into possible fault and then
ankerite off and on. Swap to new mud
9,010.0 9,193.0
3/31/2020
13:48
3/31/2020
16:00
2.20 PROD1 DRILL DRLG P New mud at the bit 9193'
CT 4714 psi, @ 1.86 bpm, free spin
866 psi, BHP 4218 pis.
9,193.0 9,237.0
3/31/2020
16:00
3/31/2020
21:00
5.00 PROD1 DRILL DRLG P Struggling to drop angle, time drill and
trough. Two atempts, break through
ankerite drill ahead
CT 5087 psi @ 1.86 bpm, free spin
950 psi, BHP 4320 psi, WH 484 psi, IA
724 psi, OA 313 psi.
9,237.0 9,392.0
3/31/2020
21:00
3/31/2020
23:00
2.00 PROD1 DRILL DRLG P OBD, CT5457 psi, 1.86 bpm, BHP
4253 psi,
9,392.0 9,590.0
3/31/2020
23:00
3/31/2020
23:12
0.20 PROD1 DRILL WPRT P PUH PUW 42 k, short wiper up hole to
get addtional turn x 2.
9,590.0 9,590.0
3/31/2020
23:12
4/1/2020
00:00
0.80 PROD1 DRILL DRLG P BOBD, 1.82 bpm at 5,070 psi,
Diff=1,008 psi, WHP=452,
BHP=4,251, IA=778, OA=326
9,590.0 9,675.0
4/1/2020
00:00
4/1/2020
00:24
0.40 PROD1 DRILL DRLG P OBD, 1.82 bpm at 5,506 psi,
Diff=1,475 psi, WHP=522,
BHP=4,197, IA=806, OA=330
9,675.0 9,730.0
4/1/2020
00:24
4/1/2020
00:54
0.50 PROD1 DRILL WPRT T Geo wiper up hole, unable to obtain
DLGS needed to stay within polygon,
PUW 42 k
9,730.0 8,647.0
4/1/2020
00:54
4/1/2020
01:30
0.60 PROD1 DRILL WPRT T Wiper back in hole, RIW 15 k, up
against hard line polygon,
8,647.0 9,655.0
4/1/2020
01:30
4/1/2020
02:12
0.70 PROD1 DRILL WPRT T Wiper up hole, launch 5x5 sweep,
perform 250' jog EOB (9,000'-9,250')
9,655.0 8,600.0
4/1/2020
02:12
4/1/2020
04:12
2.00 PROD1 DRILL TRIP T POOH, chasing sweep to the TT 8,600.0 78.3
4/1/2020
04:12
4/1/2020
05:42
1.50 PROD1 DRILL PULD T PUD, lateral BHA #13, Bit Grade 1-1,
plugged nozzle x 2
78.3 0.0
4/1/2020
05:42
4/1/2020
07:12
1.50 PROD1 DRILL PULD T PD, lateral BHA #14 w/re-run bi-center
bit Dyna-Pilot.
0.0 78.3
4/1/2020
07:12
4/1/2020
08:30
1.30 PROD1 DRILL TRIP T Tag up, reset counters, RIH 78.3 8,365.0
4/1/2020
08:30
4/1/2020
08:42
0.20 PROD1 DRILL DLOG T Log formation for depth control, -
15.5', PUW 42 k
8,365.0 8,381.0
4/1/2020
08:42
4/1/2020
09:00
0.30 PROD1 DRILL TRIP T Continue IH through the window
clean,
*** Note: Observed tight spot @ 8,660'
8k bobble
8,381.0 9,730.0
4/1/2020
09:00
4/1/2020
11:00
2.00 PROD1 DRILL DRLG P OBD, 1.85 bpm at 5,020 psi, Diff=911 9,730.0 9,927.0
4/1/2020
11:00
4/1/2020
13:00
2.00 PROD1 DRILL DRLG P OBD, 1.85 bpm at 5,616 psi,
Diff=1,581, WHP=297, BHP=4,298,
IA=651, OA=296
9,927.0 10,068.0
4/1/2020
13:00
4/1/2020
14:18
1.30 PROD1 DRILL DRLG P OBD, 1.85 bpm at 5,235 psi,
Diff=1,100, WHP=194, BHP=4,321,
IA=766, OA=306
10,068.0 10,140.0
Rig: NABORS CDR3-AC
Page 11/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/1/2020
14:18
4/1/2020
14:36
0.30 PROD1 DRILL WPRT P Wiper up hole with 5x5 sweep, PUW
43 k
10,140.0 9,340.0
4/1/2020
14:36
4/1/2020
14:54
0.30 PROD1 DRILL WPRT P Wiper back in hole, RIW 15 k 9,340.0 10,140.0
4/1/2020
14:54
4/1/2020
15:54
1.00 PROD1 DRILL DRLG P BOBD, 1.84 bpm at 5,016 psi,
Diff=988, WHP=363, BHP=4,288,
IA=783, OA=309
10,140.0 10,397.0
4/1/2020
15:54
4/1/2020
17:42
1.80 PROD1 DRILL WPRT P BHA Wiper, PUW=43K 10,397.0 10,397.0
4/1/2020
17:42
4/1/2020
18:42
1.00 PROD1 DRILL DRLG P 10397', Drill, 1.85 BPM @ 5150 PSI
FS, BHP=4330
10,397.0 10,399.0
4/1/2020
18:42
4/1/2020
18:54
0.20 PROD1 DRILL WPRT P Pull 100' wiper. Tough spot, PUW=49K 10,399.0 10,399.0
4/1/2020
18:54
4/1/2020
20:06
1.20 PROD1 DRILL DRLG P Continue to work tough spot. Break
out @ 10,406'. 1.84 BPM @ 5005 PSI
FS, BHP=4300
10,399.0 10,550.0
4/1/2020
20:06
4/1/2020
20:48
0.70 PROD1 DRILL WPRT P Pull 1000' wiper trip #2. with sweeps.
PUW= 42K
10,550.0 10,550.0
4/1/2020
20:48
4/1/2020
21:42
0.90 PROD1 DRILL DRLG P 10,550', Drill, 1.84 BPM @ 5000 PSI
FS, BHP=4315
10,550.0 10,720.0
4/1/2020
21:42
4/1/2020
21:48
0.10 PROD1 DRILL WPRT P Stacking, Pull 100' wiper, PUW=42K 10,720.0 10,720.0
4/1/2020
21:48
4/1/2020
23:36
1.80 PROD1 DRILL DRLG P 10,720', Drill, 1.84 BPM @ 4875 PSI
FS, BHP=4290
10,720.0 10,849.0
4/1/2020
23:36
4/1/2020
23:42
0.10 PROD1 DRILL WPRT P 10849, Stacking, BHA wiper,
PUW=45K
10,849.0 10,849.0
4/1/2020
23:42
4/2/2020
00:00
0.30 PROD1 DRILL DRLG P 10849', Drill, 1.84 BPM @ 4890 PSi
FS, BHP=4300
10,849.0 10,856.0
4/2/2020
00:00
4/2/2020
00:24
0.40 PROD1 DRILL WPRT P Pull 500' wiper for poor weight transfer 10,856.0 10,856.0
4/2/2020
00:24
4/2/2020
02:42
2.30 PROD1 DRILL DRLG P 10856', Drill, 1.84 BPM @ 5170 PSI
FS, BHP=4315
10,856.0 10,944.0
4/2/2020
02:42
4/2/2020
03:42
1.00 PROD1 DRILL WPRT P Wiper trip #3 to window with tie in. Jog
below window, 200' Clean trip up
10,944.0 8,640.0
4/2/2020
03:42
4/2/2020
03:48
0.10 PROD1 DRILL DLOG P Log RA marker for +8' correction 8,640.0 8,661.0
4/2/2020
03:48
4/2/2020
04:36
0.80 PROD1 DRILL WPRT P Continue wiper trip back to bottom. 8,661.0 10,944.0
4/2/2020
04:36
4/2/2020
06:36
2.00 PROD1 DRILL DRLG P BOBD, 1.82 bpm at 5,000 psi,
Diff=904, WHP=521, BHP=4,367,
IA=458, OA=285
10,944.0 11,168.0
4/2/2020
06:36
4/2/2020
11:48
5.20 PROD1 DRILL DRLG P OBD, 1.82 bpm at 4,485 psi, Diff=940,
WHP=573, BHP=4,328, IA=455,
OA=286
11,168.0 11,400.0
4/2/2020
11:48
4/2/2020
12:18
0.50 PROD1 DRILL WPRT P Wiper up hole, PUW 42 k (#1) 11,400.0 10,400.0
4/2/2020
12:18
4/2/2020
12:48
0.50 PROD1 DRILL WPRT P Wiper back in hole, RIW 10,400.0 11,400.0
4/2/2020
12:48
4/2/2020
14:30
1.70 PROD1 DRILL DRLG P BOBD, 1.83 bpm at 4,775 psi,
Diff=925, WHP=410, BHP=4,300,
IA=453, OA=287
11,400.0 11,586.0
4/2/2020
14:30
4/2/2020
14:42
0.20 PROD1 DRILL WPRT P Wiper up hole 200', PUW 52 k 11,586.0 11,386.0
4/2/2020
14:42
4/2/2020
14:54
0.20 PROD1 DRILL WPRT P Wiper back in hole, RIW 6 k 11,386.0 11,586.0
4/2/2020
14:54
4/2/2020
16:12
1.30 PROD1 DRILL DRLG P BOBD, 1.83 bpm at 4,775 psi,
Diff=925, WHP=410, BHP=4,300,
IA=453, OA=287
11,586.0 11,679.0
4/2/2020
16:12
4/2/2020
16:54
0.70 PROD1 DRILL WPRT P 11679', Pull 800' wipe trip, PUW= 42K 11,679.0 11,679.0
Rig: NABORS CDR3-AC
Page 12/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/2/2020
16:54
4/2/2020
18:12
1.30 PROD1 DRILL DRLG P 11679', Drill, 1.83 BPM @ 5037 PSI
FS, BHP=4373
11,679.0 11,727.0
4/2/2020
18:12
4/2/2020
18:54
0.70 PROD1 DRILL WPRT P 11727', Pull 700' wiper, PUW=42K 11,727.0 11,727.0
4/2/2020
18:54
4/2/2020
21:24
2.50 PROD1 DRILL DRLG P 11,727', Drill, 1.81 BPM @ 4800 PSI
FS, BHP=4390. Low ROP Ankorite
like.
11,727.0 11,748.0
4/2/2020
21:24
4/3/2020
00:00
2.60 PROD1 DRILL WPRT P 11748', Drill, 1.81 BPM @ 4800 PSI
FS, BHP=4400. Pump sweeps, Lube
pills to help with weight transfer.
Frequent BHA wipers
11,748.0 11,803.0
4/3/2020
00:00
4/3/2020
00:06
0.10 PROD1 DRILL DRLG P 11803', Drill, 1.86 BPM @ 4800 PSI
FS, BHP=4395
11,803.0 11,821.0
4/3/2020
00:06
4/3/2020
00:24
0.30 PROD1 DRILL WPRT P 11821', Pull 200' Wiper. PUW=42K 11,821.0 11,821.0
4/3/2020
00:24
4/3/2020
02:18
1.90 PROD1 DRILL DRLG P 11821', Drill, 1.89 BPM @ 4800 PSI
FS,
11,821.0 11,870.0
4/3/2020
02:18
4/3/2020
07:54
5.60 PROD1 DRILL WPRT P Start wiper trip to swab valve. Pump
additional sweeps at window with jog
below window, PUW=45K, Pull 500'
above window. Pump 3rd set of
sweeps. MM plugging off with resin
type debrie,
11,870.0 79.0
4/3/2020
07:54
4/3/2020
09:24
1.50 PROD1 DRILL TRIP P Tag up at surface, reset counters,
RBIH
79.3 8,365.0
4/3/2020
09:24
4/3/2020
09:36
0.20 PROD1 DRILL DLOG P Log formation for depth - 15.5' 8,365.0 8,395.0
4/3/2020
09:36
4/3/2020
09:48
0.20 PROD1 DRILL TRIP P Continue IH to above window, obtain
pressure surney @ 8,600'
8,395.0 8,602.0
4/3/2020
09:48
4/3/2020
10:18
0.50 PROD1 DRILL CTOP P 8,600' park to obtain static pressure
survey,
11.736 ppg/3,945 psi AP/8553.65
CTMD/6,411.28' TVD
8,602.0 8,602.0
4/3/2020
10:18
4/3/2020
12:00
1.70 PROD1 DRILL TRIP P Continue IH,weight bobble .75 k-2.5 k,
confirm TD @ 11,874'
8,602.0 11,874.0
4/3/2020
12:00
4/3/2020
12:15
0.25 PROD1 DRILL TRIP P Hesitate for :beaded liner runnig pill 11,874.0 11,874.0
4/3/2020
12:15
4/3/2020
13:15
1.00 PROD1 DRILL TRIP P Pull up to the window laying in 12.0
ppg, beaded LRP
11,874.0 8,370.0
4/3/2020
13:15
4/3/2020
13:30
0.25 PROD1 DRILL TRIP P Continue POOH, painting EOP flags. 8,370.0 8,365.0
4/3/2020
13:30
4/3/2020
13:42
0.20 PROD1 DRILL DLOG P Log formation for depth control + 4.5' 8,365.0 8,388.0
4/3/2020
13:42
4/3/2020
15:30
1.80 PROD1 DRILL TRIP P Continue POOH to surface 8,388.0 79.3
4/3/2020
15:30
4/3/2020
15:48
0.30 PROD1 DRILL TRIP P Found leaking seal on INJH hydraulic
oil cooler
79.3 79.3
4/3/2020
15:48
4/3/2020
16:18
0.50 PROD1 DRILL OWFF P At surface, tag up, check well for flow
(no-flow)
79.3 79.3
4/3/2020
16:18
4/3/2020
16:48
0.50 PROD1 DRILL PULD P LD drilling aassebly over a dead well 79.3 0.0
4/3/2020
16:48
4/3/2020
17:18
0.50 COMPZ1 CASING PUTB P Prep RF for liner ops, PJSM 0.0 0.0
4/3/2020
17:18
4/3/2020
20:00
2.70 COMPZ1 CASING PUTB P PU L1 slotted liner assemly wtih 58
joints, shorty deployment sleeve, non-
ported bullnose.
0.0 1,645.4
4/3/2020
20:00
4/3/2020
21:12
1.20 COMPZ1 CASING PULD P M/U coiltrack to liner. C/O checks in
UQC, M/U injector and surface test.
Check pack offs
1,645.4 1,689.7
4/3/2020
21:12
4/3/2020
22:30
1.30 COMPZ1 CASING RUNL P RIH BHA #15 1,689.7 8,508.0
Rig: NABORS CDR3-AC
Page 13/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/3/2020
22:30
4/3/2020
22:36
0.10 COMPZ1 CASING DLOG P Correct to flag for -18.5' correction,
PUW=40K
8,508.0 8,489.0
4/3/2020
22:36
4/3/2020
23:48
1.20 COMPZ1 CASING RUNL P Clean pass through window and down
to bottom @ 11870'. PUW=49K. Set
back down. Bring pumps on 1.5 BPM.
PUW=41K
8,489.0 11,870.0
4/3/2020
23:48
4/3/2020
23:54
0.10 COMPZ1 CASING TRIP P PUH, remove liner length left in hole. 11,870.0 10,209.0
4/3/2020
23:54
4/4/2020
00:00
0.10 COMPZ1 CASING TRIP P Trip out BHA #15 10,209.0 9,975.0
4/4/2020
00:00
4/4/2020
00:42
0.70 COMPZ1 CASING TRIP P Continue out of well, Paint EOP flag
@ 9400'
9,975.0 8,335.0
4/4/2020
00:42
4/4/2020
00:48
0.10 COMPZ1 CASING DLOG P Tie into K1 for +4 foot correction. BOL
@ 11874', TOL10228.4
8,335.0 8,355.0
4/4/2020
00:48
4/4/2020
02:12
1.40 COMPZ1 CASING TRIP P Continue out of well, Paint EOP flag
@ 7700
8,388.0 44.0
4/4/2020
02:12
4/4/2020
02:36
0.40 COMPZ1 CASING PULD P Tag up, Flow check well, PJSM, Lay
down BHA #15 on dead well
44.0 0.0
4/4/2020
02:36
4/4/2020
03:06
0.50 COMPZ1 CASING PUTB P Prep floor to run liner 0.0 0.0
4/4/2020
03:06
4/4/2020
04:24
1.30 COMPZ1 CASING PUTB P M/U L1 upper liner segment with
ported bullnose, 6.07" solid pup, 25
Jts slotted liner, and liner top billet
0.0 767.7
4/4/2020
04:24
4/4/2020
04:36
0.20 COMPZ1 CASING PULD P Rig down floor from liner ops 767.7 767.7
4/4/2020
04:36
4/4/2020
05:06
0.50 COMPZ1 CASING PULD P PJSM, Make up coiltrak to liner top
billet. Make up to coil and surface test.
767.7 821.3
4/4/2020
05:06
4/4/2020
06:36
1.50 COMPZ1 CASING RUNL P Trip in hole BHA #16 821.3 8,537.0
4/4/2020
06:36
4/4/2020
06:48
0.20 COMPZ1 CASING RUNL P Correct to the EOP flag, -15.8' 8,537.0 8,537.0
4/4/2020
06:48
4/4/2020
07:06
0.30 COMPZ1 CASING RUNL P Continued IH, seen bobble @ 9,427'
3.5 k
8,537.0 10,224.0
4/4/2020
07:06
4/4/2020
07:24
0.30 COMPZ1 CASING RUNL P CT PUW 47 k, - 2.08 k DOWOB, set
back down, bring pump online 1.5
bpm/847 psi diff, PUH CT PUW 41 k/0
k DHWOB, stop and remove liner
length from coutners
10,224.0 9,451.6
4/4/2020
07:24
4/4/2020
07:36
0.20 COMPZ1 CASING TRIP P POOH 9,451.6 8,620.0
4/4/2020
07:36
4/4/2020
07:45
0.15 COMPZ1 CASING DLOG P Log the RA +3.0', confirm TOL @
9,451.6', continue POOH
8,620.0 44.2
4/4/2020
07:45
4/4/2020
09:15
1.50 COMPZ1 CASING TRIP P At surface, check well for flow, PJSM 44.2 44.2
4/4/2020
09:15
4/4/2020
09:57
0.70 COMPZ1 CASING PULD P Inspect CT, found flat spot x 2,
continue to LD setting tools over a
dead well
44.2 0.0
4/4/2020
09:57
4/4/2020
10:09
0.20 PROD2 STK CTOP P Cut BHI Upper and Lower Quick off,
trim 20' of coiled tubing
**** Note: CT Length 15,480'
0.0 0.0
4/4/2020
10:09
4/4/2020
11:15
1.10 PROD2 STK CTOP P Install CTC, pull test 35 k, (good) 0.0 0.0
4/4/2020
11:15
4/4/2020
12:33
1.30 PROD2 STK CTOP P Install BHI tested Upper Quic, test
eline, P/T 4,500 psi (good)
0.0 0.0
4/4/2020
12:33
4/4/2020
13:18
0.75 PROD2 STK PULD P PU/MU, L1-01 kickoff/drilling assembly
BHA #17, surface test tools (good)
0.0 78.3
4/4/2020
13:18
4/4/2020
14:54
1.60 PROD2 STK TRIP P RIH 78.3 8,370.0
4/4/2020
14:54
4/4/2020
15:06
0.20 PROD2 STK DLOG P Log formation for depth control - 15.0' 8,370.0 8,388.0
Rig: NABORS CDR3-AC
Page 14/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/4/2020
15:06
4/4/2020
15:18
0.20 PROD2 STK TRIP P Continue IH 8,388.0 8,600.0
4/4/2020
15:18
4/4/2020
16:06
0.80 PROD2 STK DISP P Park coil hesitate for Drilling Fluid to
get to the bit (10 mins), displace well
8,600.0 8,600.0
4/4/2020
16:06
4/4/2020
16:54
0.80 PROD2 STK TRIP T Close EDC, RIH towards bottom, set
down @ 8662', x 5 at DTF. try 30°
RODTF, and 30° LODTF, no success.
phone TE, try 90° ROHS, 90° LOHS,
310° ROHS, 60° ROHS, no success.
8,600.0 8,662.0
4/4/2020
16:54
4/4/2020
18:24
1.50 PROD2 STK TRIP T POOH 8,662.0 78.3
4/4/2020
18:24
4/4/2020
20:00
1.60 PROD2 STK PULD T PUD, drilling assembly # 17 78.3 0.0
4/4/2020
20:00
4/4/2020
21:06
1.10 PROD2 STK PULD T PD BHA #18 FCO with 2° AKO motor
and 2.78 D-331 ridge set. From pre
loaded PDL. Make up to injecot and
surface test.
0.0 62.3
4/4/2020
21:06
4/4/2020
22:42
1.60 PROD2 STK TRIP T Trip in hole, Shallow test BHA @ 500',
continue in
62.3 8,360.0
4/4/2020
22:42
4/4/2020
22:48
0.10 PROD2 STK DLOG T Log K1 for -14' correction 8,360.0 8,371.0
4/4/2020
22:48
4/4/2020
23:06
0.30 PROD2 STK TRIP T Continue in well, set down in window
8424 20 FPM, PUH. RBIH 30 FPM
pop through window
8,371.0 8,660.0
4/4/2020
23:06
4/4/2020
23:54
0.80 PROD2 STK MILL T Stack out @ 8660. Try milling @ 1.48
BPM @ 3710 PSI FS, BHP=4140.
Stalled twice making no footage. Try
to work past at various speeds and
TF's. No good
8,660.0 8,660.0
4/4/2020
23:54
4/5/2020
00:00
0.10 PROD2 STK MILL T Mill obstruction, 1.8 BPM @ 4140 PSI
FS, BHP=4137
8,660.0 8,660.0
4/5/2020
00:00
4/5/2020
00:18
0.30 PROD2 STK MILL T Mill / work pipe down. Stall at 8660
and 8662. Stack out at 8666 with no
motor work. Break through down to
8697.
8,660.0 8,696.0
4/5/2020
00:18
4/5/2020
01:06
0.80 PROD2 STK REAM T Pump sweeps. Back ream up to 8650
@ HS, LS, and HS again
8,696.0 8,650.0
4/5/2020
01:06
4/5/2020
01:12
0.10 PROD2 STK OTHR T Dry drift area, Stack out @ 8662. Push
through to 8690
8,650.0 8,690.0
4/5/2020
01:12
4/5/2020
01:30
0.30 PROD2 STK REAM T Make reaming passes @ HS, 40L,
and 40R
8,690.0 8,640.0
4/5/2020
01:30
4/5/2020
01:36
0.10 PROD2 STK OTHR T Dry drift 8640 down. Stack weight @
8662
8,640.0 8,690.0
4/5/2020
01:36
4/5/2020
01:54
0.30 PROD2 STK REAM T 8690, Make additional reaming passes
@ 150L, 150R, HS
8,690.0 8,650.0
4/5/2020
01:54
4/5/2020
02:00
0.10 PROD2 STK OTHR T Dry drift down to 8690. Took very little
weight @ 8660. Looks good. Pump
sweeps. Pull up through window
pumping
8,650.0 8,690.0
4/5/2020
02:00
4/5/2020
03:42
1.70 PROD2 STK TRIP T Trip out of hole, Jog 150 back down to
350',
8,690.0 40.4
4/5/2020
03:42
4/5/2020
04:42
1.00 PROD2 STK PULD T At surface, PJSM, Tag up and space
out. PUD BHA #17
40.4 0.0
4/5/2020
04:42
4/5/2020
05:30
0.80 PROD2 STK PULD T PU/PD L1-01 kickoff/drilling assembly
BHA #19,
0.0 78.3
4/5/2020
05:30
4/5/2020
07:00
1.50 PROD2 STK TRIP T RIH 78.3 8,370.0
4/5/2020
07:00
4/5/2020
07:12
0.20 PROD2 STK DLOG T Log formation for depth control - 15.5' 8,370.0 8,394.0
4/5/2020
07:12
4/5/2020
07:24
0.20 PROD2 STK TRIP P Continue RIH through window and
8,660' clean to bottom, dry tag TOB @
9,447'
8,394.0 9,447.0
Rig: NABORS CDR3-AC
Page 15/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/5/2020
07:24
4/5/2020
07:36
0.20 PROD2 STK TRIP P PUH, PUW 39 k, obtain pump
paramerters
9,447.0 9,445.0
4/5/2020
07:36
4/5/2020
07:45
0.15 PROD2 STK WPST P RIH to mill 1.86 bpm at 4,724 psi,
Diff=898 psi, WHP=412, BHP=4,225,
IA=0, OA=213, stall motor @ 9,445',
PU and try again.
9,445.0 9,445.0
4/5/2020
07:45
4/5/2020
09:45
2.00 PROD2 STK WPST P RIH, 1.86 bpm at 4,724 psi, Diff=898
psi, WHP=412, BHP=4,225, IA=0,
OA=213
9,445.0 9,448.0
4/5/2020
09:45
4/5/2020
10:33
0.80 PROD2 DRILL DRLG P Drill ahead, 1.85 bpm at 4,853 psi,
DIff=980 psi, WHP=460, BHP=4,251,
IA=121, OA=280
9,448.0 9,550.0
4/5/2020
10:33
4/5/2020
10:45
0.20 PROD2 DRILL WPRT P PUH to drift KOP, PUW 43 k 9,550.0 9,430.0
4/5/2020
10:45
4/5/2020
10:57
0.20 PROD2 DRILL WPRT P RBIH, clean past billet,(KOP 9,445') 9,430.0 9,550.0
4/5/2020
10:57
4/5/2020
13:27
2.50 PROD2 DRILL DRLG P BOBD, 1.83 bpm at 5,362 psi,
Diff=887, WHP=372, BHP=4,255,
IA=234, OA=288
9,550.0 9,850.0
4/5/2020
13:27
4/5/2020
13:39
0.20 PROD2 DRILL WPRT P Wiper up hole to 9,460' PUW 42 k 9,850.0 9,460.0
4/5/2020
13:39
4/5/2020
13:51
0.20 PROD2 DRILL WPRT P Wiper back in hole, RIW 16 k 9,460.0 9,850.0
4/5/2020
13:51
4/5/2020
16:57
3.10 PROD2 DRILL DRLG P BOBD, 1.84 bpm at 4,772 psi,
DIff=920, WHP=381, BHP=4,271,
IA=330, OA=309
9,850.0 10,041.0
4/5/2020
16:57
4/5/2020
18:27
1.50 PROD2 DRILL DRLG P OBD, 1.84 bpm at 5,120 psi,
DIff=1,217, WHP=353, BHP=4,271,
IA=469, OA=353
10,041.0 10,260.0
4/5/2020
18:27
4/5/2020
19:00
0.55 PROD2 DRILL WPRT P 10260', Wiper trip #2, PUW=43K 10,260.0 10,260.0
4/5/2020
19:00
4/5/2020
21:36
2.60 PROD2 DRILL DRLG P 10,260', Drill, 1.86 BPM @ 4850 PSI
FS, BHP=4310
10,260.0 10,680.0
4/5/2020
21:36
4/5/2020
22:24
0.80 PROD2 DRILL WPRT P 10680', Wiper trip #3 to window with
tie in, PUW=42K
10,680.0 8,650.0
4/5/2020
22:24
4/5/2020
22:30
0.10 PROD2 DRILL DLOG P Log RA for +5.5' correction 8,650.0 8,662.0
4/5/2020
22:30
4/5/2020
23:36
1.10 PROD2 DRILL DLOG P Make MAD pass for resistivity
comparison
8,662.0 9,500.0
4/5/2020
23:36
4/6/2020
00:00
0.40 PROD2 DRILL WPRT P Continue wiper trip back to bottom 9,500.0 10,585.0
4/6/2020
00:00
4/6/2020
00:06
0.10 PROD2 DRILL WPRT P Complete wiper to bottom 10,585.0 10,683.0
4/6/2020
00:06
4/6/2020
01:36
1.50 PROD2 DRILL DRLG P 10683', Drill, 185 BPM @ 4820 PSI
FS, BHP=4300
10,683.0 10,935.0
4/6/2020
01:36
4/6/2020
01:48
0.20 PROD2 DRILL WPRT P 10935', BHA wiper, PUW=41K, Swap
mud pumps
10,935.0 10,935.0
4/6/2020
01:48
4/6/2020
03:24
1.60 PROD2 DRILL DRLG P 10935', Drill, 1.8 BPM @ 4820 PSi FS,
BHP=4345
10,935.0 11,090.0
4/6/2020
03:24
4/6/2020
04:06
0.70 PROD2 DRILL WPRT P 11,090', Wiper trip #1, 1000',
PUW=40K, Clean trip up and down
11,090.0 11,090.0
4/6/2020
04:06
4/6/2020
04:48
0.70 PROD2 DRILL DRLG P 11,090', Drill, 1.88 BPM @ 4880 PSI
FS, BHP=4371
11,090.0 11,209.0
4/6/2020
04:48
4/6/2020
04:54
0.10 PROD2 DRILL WPRT P BHA wiper, Swap back to pump 2,
PUW=40K
11,209.0 11,209.0
4/6/2020
04:54
4/6/2020
06:36
1.70 PROD2 DRILL DRLG P 11,209', Drill, 1.88 BPM @ 4890 PSI
FS, BHP=4524
11,209.0 11,383.0
4/6/2020
06:36
4/6/2020
06:54
0.30 PROD2 DRILL WPRT P Wiper up hole PUW 42 k 11,383.0 10,583.0
4/6/2020
06:54
4/6/2020
07:12
0.30 PROD2 DRILL WPRT P Wiper back in hole, RIW 14 k 10,583.0 11,383.0
Rig: NABORS CDR3-AC
Page 16/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/6/2020
07:12
4/6/2020
08:30
1.30 PROD2 DRILL DRLG P BOBD, 1.88 bpm at 5,080 psi,
Diff=956, WHP=563, BHP=4,375,
IA=336, OA=298
11,383.0 11,482.0
4/6/2020
08:30
4/6/2020
08:39
0.15 PROD2 DRILL WPRT P BHA Wiper up hole, PUW 43 k 11,482.0 11,482.0
4/6/2020
08:39
4/6/2020
10:51
2.20 PROD2 DRILL DRLG P BOBD, 1.88 bpm at 5,080 psi,
Diff=956, WHP=563, BHP=4,375,
IA=336, OA=298
11,482.0 11,703.0
4/6/2020
10:51
4/6/2020
11:03
0.20 PROD2 DRILL WPRT P BHA Wiper up hole, PUW 46 k 11,703.0 11,703.0
4/6/2020
11:03
4/6/2020
11:48
0.75 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,651 psi,
DIff=882, WHP=574, BHP=4,399,
IA=340, OA=298
11,703.0 11,801.0
4/6/2020
11:48
4/6/2020
12:48
1.00 PROD2 DRILL WPRT P Wiper up hole, PUW 43 k 11,801.0 8,640.0
4/6/2020
12:48
4/6/2020
13:00
0.20 PROD2 DRILL DLOG P Log RA marker correction + 6.0' 8,640.0 8,668.0
4/6/2020
13:00
4/6/2020
14:00
1.00 PROD2 DRILL WPRT P Wiper back in hole, RIW 16 k 8,668.0 11,801.0
4/6/2020
14:00
4/6/2020
16:12
2.20 PROD2 DRILL DRLG P BOBD, 1.87 bpm at 4,548 psi,
DIff=815, WHP=491, BHP=4,413,
IA=366, OA=301
11,801.0 11,921.0
4/6/2020
16:12
4/6/2020
16:18
0.10 PROD2 DRILL WPRT P 11921', BHA Wiper, PUW=42K 11,921.0 11,921.0
4/6/2020
16:18
4/6/2020
18:12
1.90 PROD2 DRILL DRLG P 11,921', Drill, 1.86 BPM @ 4689 PSI
FS, BHP=460
11,921.0 11,931.0
4/6/2020
18:12
4/6/2020
18:18
0.10 PROD2 DRILL WPRT P BHA wiper, PUW=42K, Low ROP 11,931.0 11,931.0
4/6/2020
18:18
4/6/2020
21:12
2.90 PROD2 DRILL DRLG P 11,931', Drill, 1.87 BPM @ 4710 PSI
FS, BHP=4460
11,931.0 12,055.0
4/6/2020
21:12
4/6/2020
21:18
0.10 PROD2 DRILL WPRT P BHA wiper, PUW=50K 12,055.0 12,055.0
4/6/2020
21:18
4/6/2020
21:48
0.50 PROD2 DRILL DRLG P 12055', Drill, 1.87 BPM @ 4675 PSI
FS, BHP=4410
12,055.0 12,080.0
4/6/2020
21:48
4/6/2020
22:12
0.40 PROD2 DRILL WPRT P 12,080', Geo called TD, PUH
circulating sweeps down coil
12,080.0 12,080.0
4/6/2020
22:12
4/7/2020
00:00
1.80 PROD2 DRILL WPRT P Start swab wiper, PUW=46K. Jog
8850-8890
12,080.0 8,564.0
4/7/2020
00:00
4/7/2020
02:06
2.10 PROD2 DRILL WPRT P Continue swab wiper trip 8,564.0 54.2
4/7/2020
02:06
4/7/2020
03:36
1.50 PROD2 DRILL WPRT P Tag up at surface, RBIH 54.2 8,387.0
4/7/2020
03:36
4/7/2020
03:42
0.10 PROD2 DRILL DLOG P Log K1 for -15' correction 8,387.0 8,378.0
4/7/2020
03:42
4/7/2020
03:48
0.10 PROD2 DRILL TRIP P Continue in well 8,378.0 8,600.0
4/7/2020
03:48
4/7/2020
04:06
0.30 PROD2 DRILL PRTS P 8600', Stop for static BHP, Sensor
depth 6468.72 TVD, BHP=3951,
EMW=11.75
8,600.0 8,600.0
4/7/2020
04:06
4/7/2020
05:24
1.30 PROD2 DRILL TRIP P Continue in well. Clean pass through
window, Slight bump @ 8660' 500LBS
8,600.0 12,079.0
4/7/2020
05:24
4/7/2020
05:36
0.20 PROD2 DRILL TRIP P Tag bottom 12,079. PUH circulating
LRP down CT
12,079.0 12,079.0
4/7/2020
05:36
4/7/2020
07:00
1.40 PROD2 DRILL TRIP P POOH, laying in beaded 12.0 ppg
beaded LRP
12,079.0 8,600.0
4/7/2020
07:00
4/7/2020
08:30
1.50 PROD2 DRILL TRIP P Continue POOH displacing well to
completion fluid
8,600.0 78.3
4/7/2020
08:30
4/7/2020
09:00
0.50 PROD2 DRILL TRIP P At surface, check well for flow, PJSM
(no-flow)
78.3 78.3
4/7/2020
09:00
4/7/2020
09:30
0.50 PROD2 DRILL TRIP P LD drilling assembly BHA #19 over a
dead well
78.3 0.0
Rig: NABORS CDR3-AC
Page 17/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/7/2020
09:30
4/7/2020
10:00
0.50 COMPZ2 CASING PUTB P Prep-RF for liner ops, PJSM 0.0 0.0
4/7/2020
10:00
4/7/2020
10:18
0.30 COMPZ2 CASING PUTB P PU liner segment #1 w/54 jts of slotted
liner, solid bullnose, and QCLL
0.0 246.3
4/7/2020
10:18
4/7/2020
12:18
2.00 COMPZ2 CASING CTOP T Notice was recieved Kuparuk Field in
phase 3 conditions, PU safety joint
secure well
246.3 246.3
4/7/2020
12:18
4/7/2020
12:30
0.20 COMPZ2 CASING SFTY P Phase 3 lifted to Rig, PJSM 246.3 246.3
4/7/2020
12:30
4/7/2020
14:06
1.60 COMPZ2 CASING PUTB P Continue PU liner segment #1
remaining 47 joints
246.3 1,663.8
4/7/2020
14:06
4/7/2020
14:48
0.70 COMPZ2 CASING PULD P PU CoilTrack tools, MU QCLL, stab on
and surface test tools (good)
1,663.8 1,707.6
4/7/2020
14:48
4/7/2020
16:06
1.30 COMPZ2 CASING RUNL P Tag up, reset counters, RIH 1,707.6 8,031.3
4/7/2020
16:06
4/7/2020
16:18
0.20 COMPZ2 CASING RUNL P Correct -23.8' at window flag, PUW 8,031.3 8,031.0
4/7/2020
16:18
4/7/2020
17:30
1.20 COMPZ2 CASING RUNL P Continue IH towards bottom 8,031.0 11,079.0
4/7/2020
17:30
4/7/2020
17:42
0.20 COMPZ2 CASING RUNL P Set on bottom, PUW 50 k/ -6 k, set out
on bottom, bring pump on line @ 1.5
bpm/1,264 diff, PUW 38 k/0.3 k, PUH,
remove liner length from counters
11,079.0 10,415.0
4/7/2020
17:42
4/7/2020
18:24
0.70 PROD2 CASING TRIP P POOH 10,415.0 8,335.0
4/7/2020
18:24
4/7/2020
18:36
0.20 COMPZ2 CASING DLOG P Log formation for TOL confirmation +
8.5'
8,335.0 8,335.0
4/7/2020
18:36
4/7/2020
19:54
1.30 COMPZ2 CASING TRIP P Continue OOH 8,335.0 44.2
4/7/2020
19:54
4/7/2020
20:06
0.20 COMPZ2 CASING OWFF P At surface, check well for flow, PJSM 44.2 44.2
4/7/2020
20:06
4/7/2020
20:18
0.20 COMPZ2 CASING PULD P LD setting tools over a dead well 44.2 0.0
4/7/2020
20:18
4/7/2020
20:48
0.50 COMPZ2 CASING PUTB P Prep RF for liner OPS, PJSM 0.0 0.0
4/7/2020
20:48
4/7/2020
23:12
2.40 COMPZ2 CASING PUTB P PU Liner segment #2 w/57 jts slotted
liner
0.0 1,750.4
4/7/2020
23:12
4/7/2020
23:24
0.20 COMPZ2 CASING RURD P R/D liner running equipment. 1,750.4 1,704.4
4/7/2020
23:24
4/7/2020
23:54
0.50 COMPZ2 CASING PULD P PJSM, M/U Coiltrack to liner. Stab
injector and surface test tools. Check
packoffs
1,704.4 1,794.2
4/7/2020
23:54
4/8/2020
00:00
0.10 COMPZ2 CASING TRIP P RIH BHA #21 EDC closed 1,794.2 2,273.0
4/8/2020
00:00
4/8/2020
01:06
1.10 COMPZ2 CASING TRIP P Continue in with BHA #21 L1-01
intermediate section
2,273.0 8,514.0
4/8/2020
01:06
4/8/2020
01:12
0.10 COMPZ2 CASING DLOG P Correct to flag for -21'' correction 8,514.0 8,494.0
4/8/2020
01:12
4/8/2020
01:42
0.50 COMPZ2 CASING TRIP P Continue in well 8,494.0 10,090.0
4/8/2020
01:42
4/8/2020
01:48
0.10 COMPZ2 CASING DLOG P Log K1 for +3' correction. 10,090.0 10,104.0
4/8/2020
01:48
4/8/2020
01:54
0.10 COMPZ2 CASING TRIP P Continue in well, Clean pass through
window
10,104.0 10,412.0
4/8/2020
01:54
4/8/2020
02:36
0.70 COMPZ2 CASING CTOP P Tag TOL 10,412. Pick up to 60K. Have
latch into lower liner segment. Set
back down. Bring on pumps 1.4 BPM
Pick up. still latched in. Bring pumps to
1.7 work pipe. Still latched. Goto 2
BPM work pipe still latched. Consult
town
10,412.0 10,412.0
Rig: NABORS CDR3-AC
Page 18/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/8/2020
02:36
4/8/2020
03:06
0.50 COMPZ2 CASING CTOP T Pull both sections of liner up to 10360.
PUW=74K Bring pumps online. Liner
has released. Attempt to work liner
back to bottom pumping. Run at liner.
Unable to get it to move
10,412.0 10,412.0
4/8/2020
03:06
4/8/2020
03:12
0.10 COMPZ2 CASING TRIP T Start out of hole, remove liner length
left in hole from counters
10,412.0 8,335.0
4/8/2020
03:12
4/8/2020
03:18
0.10 COMPZ2 CASING DLOG T Log K1 for +3' correction 8,335.0 8,352.0
4/8/2020
03:18
4/8/2020
03:24
0.10 COMPZ2 CASING TRIP T RBIH. Tag TOL pumping 1.5 BPM
@8621'
8,352.0 8,621.0
4/8/2020
03:24
4/8/2020
05:06
1.70 COMPZ2 CASING TRIP T Trip out of well pumping across the
top, Paint 7700' EOP flag
8,621.0 46.0
4/8/2020
05:06
4/8/2020
05:48
0.70 COMPZ2 CASING PULD T At surface, Flow check well, PJSM.
Lay down BHA #21 on dead well
46.0 0.0
4/8/2020
05:48
4/8/2020
09:48
4.00 COMPZ2 CASING WAIT T Wait on Tempress vibrating tool. BOT
stuck behind D-26 scissor lift module
move
0.0 0.0
4/8/2020
09:48
4/8/2020
10:30
0.70 COMPZ2 CASING PULD T PJSM, M/U BHA # 22 with tempress
vibrating tool. Make up to injector and
surface test tool
0.0 46.2
4/8/2020
10:30
4/8/2020
12:00
1.50 COMPZ2 CASING TRIP T RIH, BHA #22, EDC open 46.2 8,372.0
4/8/2020
12:00
4/8/2020
12:06
0.10 COMPZ2 CASING DLOG T Log K1 for -15.5' 8,372.0 8,356.0
4/8/2020
12:06
4/8/2020
12:12
0.10 COMPZ2 CASING TRIP T Continue in well, wt check @ 8570'
41K close EDC.
8,356.0 8,622.0
4/8/2020
12:12
4/8/2020
12:18
0.10 COMPZ2 CASING CTOP T 8622', ag TOL. Bring pump online 1.47
BPM @ 4830 PSI, BHP=4160.
Returns never come above .9 BPM
8,622.0 8,622.0
4/8/2020
12:18
4/8/2020
13:54
1.60 COMPZ2 CASING CIRC T PUH to 8607'. Open EDC, displace
well to 8.8 PPG drilling mud
8,622.0 8,607.0
4/8/2020
13:54
4/8/2020
14:00
0.10 COMPZ2 CASING CTOP T Mud all around, Shut EDC RBIH. Tag
up @ 8621. Pump 1.59 BPM @ 3800
PSI, BHP=4350.
8,607.0 8,621.0
4/8/2020
14:00
4/8/2020
14:36
0.60 COMPZ2 CASING CTOP T 8621', P/U and restart, PUW=40K 8,621.0 8,625.0
4/8/2020
14:36
4/8/2020
15:36
1.00 COMPZ2 CASING CTOP T P/U Observing packing off on back
side, PUH. More packing with over
pulls Pull heavy at 8486 packing off.
Can not RIH. Pop free coming up.
Head for 3 1/2. Get sample of returns
to geo. Sand and resin, Slight overpull
when CTC enters 3 1/2
8,625.0 7,724.0
4/8/2020
15:36
4/8/2020
16:00
0.40 COMPZ2 CASING CTOP T Clear up in 3 1/2 RBIH to clean 4 1/2.
Clean running in
7,724.0 8,620.0
4/8/2020
16:00
4/8/2020
16:30
0.50 COMPZ2 CASING CTOP T 8620', Lightly tag top of billet. Recip up
to 3 1/2".
Circulate and clean up from 8,620' to
7,700'.
8,620.0 8,620.0
4/8/2020
16:30
4/8/2020
18:30
2.00 COMPZ2 CASING CTOP T Circulate 12.0 ppg KWF in the CT and
lay in KWF.
8,620.0 44.0
4/8/2020
18:30
4/8/2020
19:30
1.00 COMPZ2 CASING CTOP T Monitor well, static. LD BHA and
remove upper checks.
MU nozzle to jet stack.
44.0 0.0
4/8/2020
19:30
4/8/2020
20:00
0.50 COMPZ2 CASING CTOP P Jet stack at 2.0 bpm.
Test Inner reel valve and
stripper250/4,000 psi
0.0 0.0
Rig: NABORS CDR3-AC
Page 19/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/8/2020
20:00
4/8/2020
21:30
1.50 COMPZ2 CASING CTOP P Unstab cart, MU night cap.
Grease tree, stack, and romeo valves.
Flush surface lines with fresh water
and fluid pack.
Shell test. Swab 2 leaking. Regrease
swab 2 - good test.
0.0 0.0
4/8/2020
21:30
4/8/2020
22:00
0.50 COMPZ2 CASING CTOP P PJSM and prep to test BOPE. 0.0 0.0
4/8/2020
22:00
4/9/2020
00:00
2.00 COMPZ2 CASING BOPE P Test BOPE to 250 psi / 4,000 psi.
Annular to 2,500 psi.
0.0 0.0
4/9/2020
00:00
4/9/2020
03:18
3.30 COMPZ2 CASING BOPE P Test 1. Swab 2
Test 2. Blind/Shear, BOP TV2, Charlie
4, 5, 8, &12
Test 3. BOP TV 1, Charlie 3, 7, & 11
Test 4. Manual choke D & Super
choke C
Test 5. Romeo 3, Bleeder 3, Tango 2,
Charlie 2, & 10
Test 6. Charlie 1, 9, Bravo 5, and
Tango 1 – install TIW test joint
Test 7. Lower 2” pipe slip rams, TIW
#1, Romeo 1, Bleeder 1
Test 8. Annular BOP
Test 9. Upper 2” pipe slip rams, Bravo
6, & 8
Test 10. Bravo 7 – swap out 2” test
joint for 2-3/8”
Test 11. 2-3/8” pipe slip rams, TIW#2
– check N2 levels, swap to 2” test joint
Test 12. Draw down accumulator
Test 13. Stab injector and line up to
reverse circulate coil, test inner reel
valve and stripper.
Tested all gas detectors, pits, cellar,
Verified flow alarms - PVT
Bravo 8 fail / pass.
LD test joint.
0.0 0.0
4/9/2020
03:18
4/9/2020
04:48
1.50 COMPZ2 CASING PUTB P PJSM for running liner.
PU upper section of liner:
dissolvable bull nose
24 joints 2 3/8" slotted liner
deployment sleeve
0.0 741.9
4/9/2020
04:48
4/9/2020
05:12
0.40 COMPZ2 CASING PULD P Install checks in UQC.
Stab on injector. Check packoff.
Check comms to BHI tools - good.
741.9 785.7
4/9/2020
05:12
4/9/2020
06:18
1.10 COMPZ2 CASING TRIP P Trip in well, BHA #23 785.7 6,408.0
4/9/2020
06:18
4/9/2020
07:36
1.30 COMPZ2 CASING TRIP P POOH BHA #23 6,408.0 45.0
4/9/2020
07:36
4/9/2020
08:12
0.60 COMPZ2 CASING PULD P PJSM, Flow check well. Unstab
injector and rack back.
45.0 0.0
4/9/2020
08:12
4/9/2020
08:24
0.20 COMPZ2 CASING PUTB P Reconfig BHA. Lay down 2 jts slotted.
P/U 10' pup, BHA #24 with QCLL, 22
Jts slotted, 2 pups, and seal bore
receptical
0.0 688.0
4/9/2020
08:24
4/9/2020
08:36
0.20 COMPZ2 CASING PULD P Make up coil trak to liner. Make up
injector and service test
688.0 734.2
4/9/2020
08:36
4/9/2020
10:12
1.60 COMPZ2 CASING TRIP P RIH BHA #24, Make a -15' correction 734.2 8,613.0
4/9/2020
10:12
4/9/2020
10:24
0.20 COMPZ2 CASING CTOP P Set down multiple times multiple
speeds. Unable to latch
8,613.0 8,613.0
4/9/2020
10:24
4/9/2020
10:30
0.10 COMPZ2 CASING TRIP P PUH to 8564 8,613.0 8,564.0
Rig: NABORS CDR3-AC
Page 20/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/9/2020
10:30
4/9/2020
10:36
0.10 COMPZ2 CASING DLOG P Log formation for a +9' correction 8,564.0 8,573.0
4/9/2020
10:36
4/9/2020
11:00
0.40 COMPZ2 CASING TRIP P RBIH to bottom. Set down on top of
liner. No latch. Shut choke. Attemp to
pump down backside. Well pressured
right up. Attemp latching multiple
times.
8,573.0 8,622.0
4/9/2020
11:00
4/9/2020
12:24
1.40 COMPZ2 CASING TRIP P POOH for cleanout BHA. 8,622.0 690.4
4/9/2020
12:24
4/9/2020
14:30
2.10 COMPZ2 CASING PULD P At surface, Flow check well. PJSM
Lay down BHA # 24
690.4 0.0
4/9/2020
14:30
4/9/2020
15:00
0.50 COMPZ2 CASING PULD P P/U BHA #25, FCO BHA With 2"
nozzle. Make up injector and surface
test.
0.0 42.8
4/9/2020
15:00
4/9/2020
16:30
1.50 COMPZ2 CASING TRIP P Trip in BHA #25, EDC open, Start mud
down CT
42.8 8,340.0
4/9/2020
16:30
4/9/2020
16:36
0.10 COMPZ2 CASING DLOG P Log gamma tie in for -15.5 8,340.0 8,355.0
4/9/2020
16:36
4/9/2020
18:00
1.40 COMPZ2 CASING TRIP P Continue in for fill clean out. Displace
well to mud
8,355.0 8,617.0
4/9/2020
18:00
4/9/2020
20:12
2.20 COMPZ2 CASING WASH P Cleanout QCLL at 8,621' and above to
7,940'.
stab into QCLL and pump.
1.86 / 1.84 bpm in/out 3,889 psi
Pull up hole and Packing off when
pulling into the 3 1/2" tubing. RIH to
8,100' and clear packoff.
Pump 5 bbl low, 5 bbls high visc.
sweep
Pull back up. 7,872' and no packoffs.
Maintain 12.2 ppg EMW at the
window.
MicroMotion packing off. Flush MM
and captured 1/2" diameter pieces of
resin.
8,618.0 8,615.0
Rig: NABORS CDR3-AC
Page 21/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/9/2020
20:12
4/9/2020
21:30
1.30 COMPZ2 CASING WASH P 8,615' 1.87 bpm in, 1.87 out 3,783 psi
annular 4,119, bore 4,228, diff: 109.
18 - 20K
8,618' set down 1k WOB.
PU: 39K nozzle out of QCLL
work nozzle back into QCLL, saw
pressure increase to 4,400 - 4,900 psi
3.7K WOB
PU 20'. RIH to 8,617' no pressure
increase seen.
wash down slowly at .4 fpm to 8,618.8
and saw pressure increase indication
of nozzle going into QCLL. PU 43K to
8,610' and wash back down flushing
QCLL to 8,619.3' and set down 2K
WOB and saw 80 psi increase.
PU and repeat. Sweep exiting the
nozzle.
Wash down 8,617.82' set down 1K
WOB, minor pressure increase.
PU wash down 8,619.21', no pressure
increase. PU.
Wash down 8,619.26 w/ 1.71 K WOB.
No pressure increase. PU 44K.
Wash down 8,619.38 w/ 2.23K WOB.
20 psi pressure increase. appears to
be repeatable depth with no pressure
increase. PU. Pump 5 x 5 sweep.
Pull up into the 3 1/2" tubing.
7,983', pressure increase to 4,300 psi
w/ CTC inside the the 3 1/2" and
viscous sweep out of the nozzle. Run
back in hole and pressure remaining
elevated at 4,268 psi. circulating
sweep out of the hole. RIH and
pressure returnned to normal at 8,260'
+/-.
8,615.0 7,993.0
4/9/2020
21:30
4/9/2020
22:12
0.70 COMPZ2 CASING WASH P RIH, Tie in at 8,331' to 8,353'. +3'
correction.
Pump sweep.
RIH to confirm tag depth.
8,610'. 1.84 bpm in, 1.91 out. 3,800
psi
sweep exiting the nozzle at 8,613'.
3,940 psi. wash down to 8,621.26
with .5K WOB.
Wash out and back into QCLL same
depth and WOB. PU to 8,613'.
Wash back down to QCLL 8,621.54'
and set down 1.85K WOB.
Good confirmation of tag depth and
clean repeatable without packoff.
7,993.0 8,621.0
4/9/2020
22:12
4/9/2020
23:42
1.50 COMPZ2 CASING WASH P Pull up hole to clean up 4.5" x 3.5"
transition.
Pull clean into 3.5" tubing with no
packoffs.
Pump 10 bbls high visc sweep and 5 x
5 sweep.
RIH 8,400' some packing off,
RIH to 8,591'. Open EDC.
8,621.0 8,591.0
4/9/2020
23:42
4/10/2020
00:00
0.30 COMPZ2 CASING WASH P POOH and increase pump rate to 2.69
in / 2.41 out, 5,361 psi
Annular velocity in 4.5" liner 240 fps.
Getting 1/2" - 3/4" resin chunks out at
+/- 8,060' nozzle depth.
POOH, jog in hole at 3,500' and at
surface. MP choke packing off.
Switch chokes.
8,591.0 8,060.0
Rig: NABORS CDR3-AC
Page 22/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/10/2020
00:00
4/10/2020
02:12
2.20 COMPZ2 CASING WASH P POOH with EDC open and cleanout
tubing to surface.
2.69 in, 5,361 psi. MM out bypassed
due to packing off.
POOH, jog in hole at 3,500' and at
surface. MP choke packing off.
Switch chokes.
8,060.0 20.0
4/10/2020
02:12
4/10/2020
04:00
1.80 COMPZ2 CASING TRIP P RIH. Close and test EDC at 500'.
Tie in 8,331' to 8,353'. -15' correction
20.0 8,353.0
4/10/2020
04:00
4/10/2020
04:54
0.90 COMPZ2 CASING WASH P 1.84 in / 1.91 out 3,650 psi
Tag 8,619.96 w/ 0.95K WOB. WOB
falling off slowly
Wash down 8,620.2. PU 42K. to
8,608'
8,620.8' at 2.3K WOB. WOB falling off
slowly to 1.6K.
PU to 8,611'.
Wash down. Tag at 8,621.12 w/ 1.33
K WOB. Set down to 2.4K WOB.
Pressure increased to 4,000 psi. PU to
8,614'.
Repeat tag. 8,621.48 with 1.99K
WOB. PU 42K.
Pull up to confirm clean entry into 3.5"
tubing.
Pull up to 7,974', packing off. Run
back in hole.
Pull back up into 3.5" tubing clean.
8,353.0 7,883.0
4/10/2020
04:54
4/10/2020
05:36
0.70 COMPZ2 CASING CIRC P Pump 20 bbls 12.0 ppg high visc. pill
at 149K LSRV, followed by 12.0 ppg
KWF.
Some packing off. Still getting resin
rocks back at bottoms up. MM
packing off.
Tag 8,620.6 at 1.5K WOB.
7,883.0 7,942.0
4/10/2020
05:36
4/10/2020
07:00
1.40 COMPZ2 CASING TRIP P Paint white flag, POOH 7,942.0 45.0
4/10/2020
07:00
4/10/2020
08:36
1.60 COMPZ2 CASING PULD P Tag up, Flow check well, PJSM Lay
down BHA #25
45.0 0.0
4/10/2020
08:36
4/10/2020
10:00
1.40 COMPZ2 CASING PUTB P P/U BHA #26 with QCLL disolvable
bull nose, 22 Jts BLANK liner, 10'
pups and NS GS spear with sealing
prong. Make up coiltrak. M/U to
insector and surface test
0.0 733.5
4/10/2020
10:00
4/10/2020
11:18
1.30 COMPZ2 CASING RUNL P Trip in well 733.5 8,545.0
4/10/2020
11:18
4/10/2020
11:30
0.20 COMPZ2 CASING DLOG P Tie into gamma, minus 14.5' 8,545.0 8,570.0
4/10/2020
11:30
4/10/2020
12:18
0.80 COMPZ2 CASING RUNL P Continue in well, Tag up @ 8621 @
min rate, Shut down pump. P/U not
latched. Trip in washing down. Pick
up. No latch. Wash back down. Jet @
1 BPM. Packed off. Shut down pump.
Holding 1500PSI Circ pressure. Pick
up. Looks like liner not on. Make
multiple attempts to latch. Trip out of
well
8,570.0 8,621.0
4/10/2020
12:18
4/10/2020
13:36
1.30 COMPZ2 CASING TRIP P POOH, pumping across top 8,621.0 45.0
4/10/2020
13:36
4/10/2020
14:00
0.40 COMPZ2 CASING PULD P At surface, Flow check well. PJSM,
Unstab injector. Pull Coiltrak from well.
BHA #26 No liner,
45.0 0.0
4/10/2020
14:00
4/10/2020
14:30
0.50 COMPZ2 CASING PULD P Reconfigure BHA. P/U non sealing NS
GS spear. Put in well, M/U coil to tool
and surface test - Good
0.0 43.8
Rig: NABORS CDR3-AC
Page 23/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/10/2020
14:30
4/10/2020
15:54
1.40 COMPZ2 CASING TRIP P RIH BHA #27 43.8 7,855.0
4/10/2020
15:54
4/10/2020
16:00
0.10 COMPZ2 CASING DLOG P Log Gamma tie in for -14.5' 7,855.0 7,876.0
4/10/2020
16:00
4/10/2020
16:06
0.10 COMPZ2 CASING TRIP P Continue in well, PUW=38K @ 7876,
zero DHWOB
7,876.0 7,933.0
4/10/2020
16:06
4/10/2020
17:30
1.40 COMPZ2 CASING TRIP P Set down on liner, PUH, PUW=41K,
DHWOB=-2.7K,
Unable to latch into section 2 of liner.
Trip out of well
7,933.0 733.5
4/10/2020
17:30
4/10/2020
21:00
3.50 COMPZ2 CASING PULD P Lay down BHI tools and solid liner
(wet).
733.5 0.0
4/10/2020
21:00
4/10/2020
21:30
0.50 COMPZ2 CASING OTHR P Load slotted liner into the pipe shed
and restrap.
0.0 0.0
4/10/2020
21:30
4/10/2020
23:24
1.90 COMPZ2 CASING PULD P PJSM for picking up liner.
PU steel bullnose, 22 joints slotted
liner, 2 pup joints (10' total), and
deployment sleeve.
MU CoilTrak tools.
Stab injector. Test CoilTrak tools -
good.
0.0 734.2
4/10/2020
23:24
4/11/2020
00:00
0.60 COMPZ2 CASING TRIP P RIH with liner. 734.2 3,100.0
4/11/2020
00:00
4/11/2020
01:18
1.30 COMPZ2 CASING TRIP P RIH with liner. Tie in, 8,535' - 8,580'. -
14.5' correction.
PU wt.: 41K
RIH and tag TOL section 2 at 8,621',
set down 3.5K WOB.
Bring pump online to 1.5 bpm to
release GS from liner. PU= 39K
BHP=3768PSI, TVD=6461.58
3,100.0 8,621.0
4/11/2020
01:18
4/11/2020
04:54
3.60 DEMOB MOVE DMOB P Liner released. Set end of CT depth.
Displace CT with seawater.
POOH. PJSM with LRS for FP.
FP well from 2,500' to surface with 30
bbls of diesel.
Tag up at surface.
7,918.6 28.3
4/11/2020
04:54
4/11/2020
07:06
2.20 DEMOB MOVE PULD P PJSM, PUD BHA # 28 Liner running
tools, Lay down tools Final SITP=1170
28.3 0.0
4/11/2020
07:06
4/11/2020
10:00
2.90 DEMOB MOVE RURD P Remove checks from UQC. Mix
corrosion inhibitor 20 BBl pill. Pump
20 BBls fresh water, 20 BBl inhibitor,
50 BBls fresh water down CT out to
TT
0.0 0.0
4/11/2020
10:00
4/11/2020
11:00
1.00 DEMOB MOVE CTOP P PJSM w HES N2 pumpers. MIRU N2
pumper, Begin cool down
0.0 0.0
4/11/2020
11:00
4/11/2020
12:30
1.50 DEMOB MOVE CTOP P PT N2 to 4K. Bring online 1500 SCF
for 15 minutes. S/D N2 bleed off to TT
0.0 0.0
4/11/2020
12:30
4/11/2020
14:00
1.50 DEMOB MOVE CTOP P Pull upper QC. Position injector / reel
for inner reel iron removal. Remove
inner reel iron - wash pipe - Pressure
bulkhead. Load pits with fresh water
flush
0.0 0.0
4/11/2020
14:00
4/11/2020
18:00
4.00 DEMOB MOVE CTOP P PSSM, Position injector for CT
removal from injector and secure.
Remove CT counters. Unstab and
secure CT to reel, install shipping
chains.
RU slings and shackles, remove
stripper/brass, continue to flush pits.
0.0 0.0
Rig: NABORS CDR3-AC
Page 24/24
3O-04
Report Printed: 5/12/2020
Operations Summary (with Timelog Depths)
Job: DRILLING SIDETRACK
Time Log
Start Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-X Operation
Start Depth
(ftKB) End Depth (ftKB)
4/11/2020
18:00
4/11/2020
21:00
3.00 DEMOB MOVE CTOP P Remove reel containment and saddle
clamps
Housekeeping in pipe shed. Send out
riser sections under pipe rack.
Remove excess cut coil. Modify
shipping boxes.
Flush and corrosion inhibit all pits.
0.0 0.0
4/11/2020
21:00
4/12/2020
00:00
3.00 DEMOB MOVE CTOP P Clean stripper and prep for storage.
Remove all inner reel iron from pipe
shed.
Send out Baker tools from pipe shed.
Remove QTS and pump in sub riser.
0.0 0.0
4/12/2020
00:00
4/12/2020
00:00
0.00 DEMOB Rig up reel for removal. Prep injector
for removal. Break down PDL's for
removal
0.0 0.0
Rig: NABORS CDR3-AC
&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN
!
"
!#$%#$&'()&*&+,&,
-..(&%
./0
. .1!2
3$%&4.45.
6%.,!"'()-./01((%2!"'()-33.&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN !"#!"'()!"'()*+!"'()*+5.$+/4#6
.!"'()-./01((%2!"'()-37
.5!"'()6 .8
.-69.
. &&+06723
4$+0672
4$"
"
&3 8
&48 #&49(),&* 5% #%44(3
%.(
%.3.73.%:;&4:7;& "%%%8
%(.!"'()%%(1(((1((:8(668(!(1///6/8/+/1/;(1((4%.%(1((7(<6;=+:17(+
+)0<)7=601;(:545<=>?% 3</> 3<=>6%763!"'()*+>>,6(+0 )?+?6(6( +:1(: ;(1;7 /78!;:1:(.0.
%7.3!"'()*++1( 4 4*0 . ?</0><
>:7;& <
><=>:;&4<
>/$.;8:((1((6(1(((1(((1((/01((?<
>
3/7
<45>/<
>)?+:?6(6(
%"&&'>@" &'&"&&
+((1((;8:((1(( !"'()2!"'()3+?+/?6((+,5$'
A"
*@ ,5$'
A"
*@AB**;8:6(1((;8:0(177 !"'()*+,5$
2!"'()*+3!?!(?6(6( !?!+?6(6(,5$"5&> "5&>,5$'&##;876(100++8;!:1(+ !"'()*+,5$2!"'()*+3!?!+?6(6( )?!?6(6(
-..(&%
./0
. .1!2
3$%&4.45.
6%.,!"'()-./01((%2!"'()-33.&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN.XSDUXN5LYHU8QLW.XSDUXN23DG22/2/5.$+/4#6
.!"'()-./01((%2!"'()-37
.5!"'()6<
>@<=>A<=>:;&4<
>:7;& <
>
/0<
>/0 <
>673<>63<>0 <>( <=;B>
/74;8:((1(( )!1+6 6;!1;+ :8/()1+( 68(:!107 ')87);1)::8))/1+( :8(6)8(7;1(! /6(87:(1// (1+) !+/1)! ,5$'
A"
*@263;8:6(1(( )!1(7 6;!177 :8/+;17( 68(:716! ')87:+17!:8)/017( :8(6)8(;+16) /6(87)7167 (16; !+!10: ,5$'
A"
*@263";8:!:1(( )7106 6;!1;( :8/60106 68(:010/ ')87761;(:8)7(106 :8(6)8(;!106 /6(87!:1+; !(1!+ !+6176 ,5$'
A"
*@263#4C
;8::(1:( /71() 6;)1(( :8/))1;; 68(7)1:! ')870+176:8);/1;; :8(6)8(;;1/) /6(87+716/ !71(; !+(1:/ ,5$'
A"
*@263#4C
;8:0(177 7617) 6;)16( :8//71:/ 68(;+167 ')8;+;1+):8)0;1:/ :8(6)8(0/1(0 /6(8:0(1;6 /61() !(71;: ,5$'
A"
*@263#4C
;876(100 7;1!6 6;)1;6 :8/:/1+0 68(;;1:( ')8;):1)/:8/(:1+0 :8(6)8+(61!6 /6(8::61); +;1/7 !(/1(: ,5$"5&>2!3;87/(10+ ;(1!; 6;016: :8/7(17! 68(07166 ')8;7)1/::8/++17! :8(6)8++(1;) /6(8:!)1!/ +:1+! !(!1/) ,5$"5&>2!3;87;(1/7 ;61+6 60!1)6 :8/7/16) 68+(71;0 ')80(+1;/:8/+:16) :8(6)8+6+1)+ /6(8:(71(6 +/1(/ !()16! ,5$"5&>2!3;8;+(1;( ;!16: 60;16; :8/701(0 68+6(10: ')806;1;!:8/6(1(0 :8(6)8+!)1!0 /6(8/;(1(( +:1!0 !(7160 ,5$"5&>2!3;8;)(17; ;)1+0 !(+10; :8/;61!7 68+!/10+ ')80/)1:(:8/6!1!7 :8(6)8+)016: /6(8//)1+; +61:/ !+61/! ,5$"5&>2!3;8;7(170 ;)1/( !(/10! :8/;/1!6 68+/61/0 ')80701!::8/6:1!6 :8(6)8+:/1;/ /6(8/601!: +!1+) !+017! ,5$"5&>2!3;80(+1+0 ;)1)! !+(1+) :8/;;16: 68+7+16! '/8((!1+0:8/6016: :8(6)8+;)1)( /6(8/(/1); +!170 !601+( ,5$"5&>2!3;80!(1++ ;!1)/ !+!17: :8/0+1!+ 68+0(1)/ '/8(6)1/7:8/!61!+ :8(6)86(!1// /6(8);)1(! +610( !!01;) ,5$"5&>2!3;80:(1;/ ;)1;+ !+;1/) :8/0)1): 686+61/( '/8()/17/:8/!/1): :8(6)866/1/6 /6(8):617; +:1(0 !/!1!6 ,5$"5&>2!3;80;;1:! ;)1:6 !6)1)7 :8/071(6 686!)1+) '/8(:610::8/!;1(6 :8(6)86)71+( /6(8))/1)0 6+167 !:7177 ,5$"5&>2!308(+!1:: ;)10: !671); :8/00160 686/)170 '/8(7:10+:8/)(160 :8(6)86:717( /6(8)!+1); +61(/ !;61)+ ,5$"5&>2!308()!1!6 ;)1:; !6;1)( :8:(+107 686701;! '/8(061/0:8/)6107 :8(6)86061:; /6(8)+/176 !16! )((1/7 ,5$"5&>2!308(;)1!/ ;;1;0 !!!1;7 :8:()167 68!+/1:; '/8++61!/:8/)/167 :8(6)8!6;1)7 /6(8!0/1;! +:1;( )671/( ,5$"5&>2!308+(016( ;016! !!/1(: :8:()1:; 68!!;1+( '/8+6!1(::8/)/1:; :8(6)8!/(1;/ /6(8!;/1(/ )10; )))10+ ,5$"5&>2!308+!)1// ;;1:6 !!/1;7 :8:(/1+: 68!:+1+: '/8+!!1/;:8/):1+: :8(6)8!7!1;: /6(8!7)1)/ )1(( ):6107 ,5$"5&>2!308+:!1!; ;;1;0 !!:10! :8:(/17; 68!;71/7 '/8+)/1+6:8/):17; :8(6)8)((16! /6(8!:61;6 !170 );!1;/ ,5$"5&>2!3086(016! ;;1:6 !!;10/ :8:(:17; 68)!(1(/ '/8+:61!):8/)717; :8(6)8))61:/ /6(8!)/1): )1)) /+71;; ,5$"5&>2!3086)!1)6 ;;17) !)(176 :8:(71/7 68):61+) '/8+7)1+6:8/);1/7 :8(6)8)7)1:0 /6(8!!!1/7 /1+0 /))1(( ,5$"5&>2!30867)1/! ;;1:/ !)(10( :8:(;167 68)0+1/+ '/8+;)1!):8/)0167 :8(6)8/()1(! /6(8!6!16) (1:/ /:;1+( ,5$"5&>2!308!(61)7 ;710+ !!017+ :8:(01++ 68/+71;( '/8+0!17/:8//(1++ :8(6)8/!(160 /6(8!+!17) /1(+ /;01/0 ,5$"5&>2!308!60170 ;;106 !)(1!: :8:(01;7 68/)!1)7 '/86(!1(;:8//(1;7 :8(6)8///106 /6(8!()1!! )1)( :+(1/6 ,5$"5&>2!308!:61)6 ;71;/ !)+1+0 :8:+(170 68/7)167 '/86+!1;6:8//+170 :8(6)8/;:1:; /6(860!1)0 )1+/ :!/170 ,5$"5&>2!308!;;1;7 ;:1+6 !)(1:7 :8:+61+; 68/0016! '/86661)/:8//!1+; :8(6)8:++1:+ /6(86;)177 :1;! :/:1!( ,5$"5&>2!308)66177 ;)1:7 !)(177 :8:+)10( 68:!+1+! '/86!!1:(:8///10( :8(6)8:)!1): /6(867!1/+ )160 :;61)/ ,5$"5&>2!308)/61)6 ;)166 !)+177 :8:+7177 68:/01(7 '/86)!1(;:8//;177 :8(6)8:7+1!7 /6(86:!10) !1:; 7(/1)7 ,5$"5&>2!3
-..(&%
./0
. .1!2
3$%&4.45.
6%.,!"'()-./01((%2!"'()-33.&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN.XSDUXN5LYHU8QLW.XSDUXN23DG22/2/5.$+/4#6
.!"'()-./01((%2!"'()-37
.5!"'()6<
>@<=>A<=>:;&4<
>:7;& <
>
/0<
>/0 <
>673<>63<>0 <>( <=;B>
/7408);:16! ;)1;0 !)!1(0 :8:6(10; 68:0+1+: '/86/!16):8/:+10; :8(6)87(!1)6 /6(86/!1:7 )1!: 7!61+/ ,5$"5&>2!308/+/17) ;/1:) !))1;( :8:6!1)6 687+01)6 '/86:+1!7:8/:)1)6 :8(6)87!+1:/ /6(86)/1)) :1!+ 7//106 ,5$"5&>2!308/):1;6 ;/17: !)/10! :8:6/17/ 687)01)+ '/86:016(:8/::17/ :8(6)87:+1:+ /6(86!71/+ !1:/ 7;+1)6 ,5$"5&>2!308/7/17/ ;:17+ !)71)+ :8:671:/ 687771/( '/867/1;::8/:;1:/ :8(6)87;01:7 /6(86!(17: :1(7 ;(/1/) ,5$"5&>2!308:((1;7 ;:100 !);1)6 :8:601(! 68;(61(6 '/86;+1++:8/7(1(! :8(6)8;+)1+; /6(866/1)6 )1+7 ;6:170 ,5$"5&>2!308:!(177 ;71+7 !)01!0 :8:!(1// 68;!+1!6 '/86;:1;::8/7+1// :8(6)8;)!1): /6(86+01/; !1!( ;/61!: ,5$"5&>2!308::(107 ;71/7 !)010; :8:!+10) 68;:+1(( '/860616::8/7610) :8(6)8;7!1++ /6(86+)1(7 61!: ;7;1)+ ,5$"5&>2!308:0(10/ ;71); !/(1;6 :8:!!16! 68;0(1/) '/860716/:8/7)16! :8(6)80(61:! /6(86(;10; 61;6 0()1)/ ,5$"5&>2!3087+;16/ ;;1/: !/+1;! :8:!)1+7 680+71/+ '/8!(+1!7:8/7/1+7 :8(6)80601/; /6(86()177 /1)+ 06;1!0 ,5$"5&>2!3087)71/! ;;17+ !/)1:; :8:!)1;7 680):1/7 '/8!()1;(:8/7/1;7 :8(6)80/;1:! /6(86(+16! 017) 0/)1/6 ,5$"5&>2!30877!1(: ;;1): !/;1)0 :8:!/1/( 680761(/ '/8!(:1!!:8/7:1/( :8(6)80;)1+( /6(8+001:! +)10/ 07710) ,5$"5&>2!308;(61/) ;71;/ (1:/ :8:!:1)/ !8((+1/+ '/8!(:1//:8/771)/ :8(6/8(+!1// /6(8+001!( 71:+ +8((/1// ,5$"5&>2!308;!6160 ;71/+ /1(6 :8:!71:: !8(!+1+0 '/8!(/1(;:8/7;1:: :8(6/8()!16) /6(86((1:7 +)176 +8(!!10) ,5$"5&>2!308;/616: ;;1/! 717) :8:!;1!/ !8(/+1(6 '/8!(61;::8/701!/ :8(6/8(:!1(; /6(86(61;6 +)1/) +8(/!1!) ,5$"5&>2!308;;61;: ;;100 +61+! :8:!01(+ !8(;+1+/ '/86071/;:8/;(1(+ :8(6/8(0!166 /6(86(7100 +)1)6 +8(;!1)/ ,5$"5&>2!3080+!1+/ ;;1/0 +)1+: :8:!01:/ !8++(1:) '/860(17(:8/;(1:/ :8(6/8+6617! /6(86+)17; :1;! +8++!1/6 ,5$"5&>2!3080):167 ;;1!+ +!177 :8:)(1/) !8+)6177 '/86;617+:8/;+1/) :8(6/8+/)1;; /6(86661:: +1)/ +8+):1)) ,5$"5&>2!308077166 ;/1)/ +!16! :8:)616! !8+761;+ '/867/1)0:8/;!16! :8(6/8+;)10/ /6(8660177 01)( +8+771+) ,5$"5&>2!3+(8((71/+ ;/1(6 +!1;) :8:))17) !86(61+: '/86:;1)!:8/;/17) :8(6/86+)1!6 /6(86!:17! 61): +86(71+) ,5$"5&>2!3+(8(!7166 ;71!0 +!1/+ :8:):17+ !86!(10: '/86:+1)6:8/;717+ :8(6/86)!1+) /6(86)!1:) ;1(/ +86!:1:( ,5$"5&>2!3+(8(:71!6 0+16! +!1(0 :8:)71(7 !86:(16/ '/86/)1/(:8/;;1(7 :8(6/86761)) /6(86/(1): +61;! +86::1)0 ,5$"5&>2!3+(8(0716: ;;1/! +61+6 :8:)71+) !86;01): '/86)710::8/;;1+) :8(6/8!(+1:; /6(86/:1;0 01/; +860:1+7 ,5$"5&>2!3+(8+671:; 0+16! ++1;; :8:)716( !8!+0166 '/86)+1:):8/;;16( :8(6/8!!+1)/ /6(86:!1+6 ;10+ +8!6:1!( ,5$"5&>2!3+(8+/71)! 061(( ++100 :8:):1!: !8!);1!+ '/86!/1)0:8/;71!: :8(6/8!:(1/: /6(86:01+: 61:+ +8!//17) ,5$"5&>2!3+(8+;7107 0+1/! +(177 :8:)/1)6 !8!7;16! '/86601)7:8/;:1)6 :8(6/8!0(1/+ /6(867/1(; )16; +8!;/106 ,5$"5&>2!3+(86+71;; 0(1/6 +(1)( :8:))1;0 !8)(71:! '/866!107:8/;/1;0 :8(6/8)+0106 /6(86;(1); !1:( +8)+/1)6 ,5$"5&>2!3+(86)71;+ 0/1)7 01;7 :8:)!1!6 !8)!71() '/86+;176:8/;)1!6 :8(6/8))01!/ /6(86;/1:! +:1:! +8)))1;: ,5$"5&>2!3+(867710! 0/10: +(1++ :8:)(1!6 !8)::1/: '/86+!1/6:8/;+1!6 :8(6/8)7;1;; /6(860(17! +1;+ +8)7)1!7 ,5$"5&>2!3+(8!(71:) 0/1/( +!1(! :8:!71!: !8)0/1/6 '/86(71/0:8/7;1!: :8(6/8/(71;/ /6(860:1/: 010( +8/(!1:+ ,5$"5&>2!3+(8!!717: 0)16+ +)17! :8:!)1;+ !8/6)1:/ '/86((1!0:8/7/1;+ :8(6/8/!71(+ /6(8!(!1:: 71(7 +8/!!1)/ ,5$"5&>2!3+(8!:;1(7 061;: +/167 :8:!610) !8//!1;7 '/8+061/::8/7!10) :8(6/8/::16/ /6(8!++1!0 )1;( +8/:!1/0 ,5$"5&>2!3
-..(&%
./0
. .1!2
3$%&4.45.
6%.,!"'()-./01((%2!"'()-33.&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN.XSDUXN5LYHU8QLW.XSDUXN23DG22/2/5.$+/4#6
.!"'()-./01((%2!"'()-37
.5!"'()6<
>@<=>A<=>:;&4<
>:7;& <
>
/0<
>/0 <
>673<>63<>0 <>( <=;B>
/74+(8!001)+ 0)1:+ +)1// :8:!(10( !8/;)1(0 '/8+;)1/+:8/7+10( :8(6/8/0:1)0 /6(8!+01!! :1() +8/0)17) ,5$"5&>2!3+(8)!(1/+ 0(16+ +61;+ :8:601/0 !8:+)167 '/8+771+7:8/7(1/0 :8(6/8:6:17( /6(8!6:1/7 +/16+ +8:6/1:+ ,5$"5&>2!3+(8)//16; 0+1)) +(1/7 :8:6016! !8:!;1/! '/8+761+/:8/7(16! :8(6/8:/(10: /6(8!!+1/( +(1!6 +8:/(1+6 ,5$"5&>2!3+(8);/1)0 0+1/7 71;; :8:6;1)) !8::;1!! '/8+:71!+:8/:01)) :8(6/8:;(17; /6(8!!:16) ;10+ +8:7017; ,5$"5&>2!3+(8/+/17! 0(1+6 /1// :8:67100 !8:0;1!: '/8+:!177:8/:;100 :8(6/87+(1;6 /6(8!!01:; 01(7 +87(016+ ,5$"5&>2!3+(8/)/16! 0+17/ !177 :8:671/+ !876717/ '/8+:+1!;:8/:;1/+ :8(6/87)(166 /6(8!)+107 ;1+; +87!71:/ ,5$"5&>2!3+(8/7:1+: 0+1;+ )1!6 :8:6:1// !87/;1/0 '/8+/01+0:8/:71// :8(6/877+1(: /6(8!))1(/ +170 +87:71!7 ,5$"5&>2!3+(8:(/106 061(: 716( :8:6/1// !87;;1+; '/8+/:16+:8/::1// :8(6/8;((1:: /6(8!):10! 017+ +870:16( ,5$"5&>2!3+(8:!/17( 0!1:/ +(1:7 :8:6)1(: !8;+71/: '/8+/+1/0:8/:/1(: :8(6/8;!(1(/ /6(8!/+1)) +61;( +8;6/1!; ,5$"5&>2!3+(8::/1;/ 0(1!7 +(1)! :8:6!1(( !8;)71+; '/8+):1(;:8/:)1(( :8(6/8;/01:; /6(8!/:1;: +(10+ +8;//1+( ,5$"5&>2!3+(8:0/1)0 ;;17+ 016( :8:6!16) !8;7:1!; '/8+)+1(6:8/:)16) :8(6/8;;;10( /6(8!:+1;+ :107 +8;;)167 ,5$"5&>2!3+(876/1!: 0+1;7 +(1:) :8:6!1(0 !80(/1;( '/8+!/1;;:8/:)1(0 :8(6/80+;1!! /6(8!::1;/ ++1:! +80+!1:; ,5$"5&>2!3+(87//17( 061)0 ++1/0 :8:6+10) !80!/1// '/8+!(1(!:8/:610) :8(6/80);1+( /6(8!761:( !17) +80)!1:! ,5$"5&>2!3+(87;/1)/ 0!10: +)1(/ :8:6(16: !80:)1/+ '/8+6!1)):8/:+16: :8(6/80771(; /6(8!701(0 01:6 +807!1+( ,5$"5&>2!3+(8;+)10) 0/16( +71!( :8:+710+ !80061;+ '/8++/1/(:8//;10+ :8(6:8((/1)( /6(8!;:10! ++17: 68((61)( ,5$"5&>2!3+(8;))10: 061+/ +:1// :8:+/10; )8(6+1): '/8+(:17;:8//:10; :8(6:8(!)1(0 /6(8!0/1// +(1): 68(!61!6 ,5$"5&>2!3+(8;7)17) 0(1(! +;1)( :8:+/1)6 )8()01;: '/8(071;):8//:1)6 :8(6:8(:61/+ /6(8)()1!0 01)/ 68(:61(: ,5$"5&>2!3+(80(/16; ;71++ +01!( :8:+:1+; )8(7;17/ '/8(;710;:8//71+; :8(6:8(0+1)! /6(8)+)1+/ +(1(( 68(061/; ,5$"5&>2!3+(80)(1)0 ;:10( 6(1): :8:+;1(6 )8+++1;6 '/8(7:1(6:8//01(6 :8(6:8+6)1/) /6(8)6:1(( !1!) 68+6717) ,5$"5&>2!3+(807(1/: ;;1+! 6610; :8:+01!6 )8+!0176 '/8(:)10+:8/:(1!6 :8(6:8+/61); /6(8)!71(6 01!6 68+/7177 ,5$"5&>2!3++8(((1)+ ;:1)) 6)1!/ :8:6(17) )8+:71(! '/8(/610):8/:+17) :8(6:8+701;6 /6(8));1;0 716; 68+;71/6 ,5$"5&>2!3++8(!(1;0 ;/1:0 6:1)0 :8:661;! )8+0)1)0 '/8(!01;0:8/:!1;! :8(6:86(71!! /6(8):+1;) 71)6 686+7170 ,5$"5&>2!3++8(:(17) ;;1)! 6;167 :8:6)1!: )866(10: '/8(6:1+;:8/:/1!: :8(6:86!!1;) /6(8)7/1): +(10) 686)71!/ ,5$"5&>2!3++8(0(17! ;;166 !61(( :8:6/16) )86):1;; '/8(++1+!:8/::16) :8(6:86/01;+ /6(8)0(1)6 +61)/ 6867:1;/ ,5$"5&>2!3++8++/1// ;;166 !)1/6 :8:6:1(+ )86:71:6 ')80071/!:8/:71(+ :8(6:86;(1/0 /6(8/(!10/ +(1+/ 68!(+1(( ,5$"5&>2!3++8+)/10! ;716! !:16; :8:6716+ )86061!7 ')807010/:8/:;16+ :8(6:8!(/1)( /6(8/6+1)/ :1:) 68!!(16: ,5$"5&>2!3++8+7/1)+ ;:1(( !01++ :8:6;10/ )8!+/1:/ ')80:+10/:8/:010/ :8(6:8!6;17) /6(8/!01!: +(1)/ 68!/;1!( ,5$"5&>2!3++86(/1:0 ;)1+6 )61+/ :8:!+1/: )8!!;1/) ')80)61!+:8/761/: :8(6:8!/+17( /6(8//;106 ++177 68!;:1/6 ,5$"5&>2!3++86!/17! ;!1); ))10/ :8:!)1;+ )8!:(1+; ')806+17):8/7/1;+ :8(6:8!7!1)+ /6(8/701)+ 01/+ 68)+!10( ,5$"5&>2!3++86:/1!7 ;:10: )71++ :8:!716; )8!;(1:0 ')80((1)0:8/7;16; :8(6:8!0!10; /6(8:((1/0 +!1;( 68))(1)! ,5$"5&>2!3++860)1:+ ;;1:/ /(1() :8:!;1)( )8)((1(6 ')8;7;1/;:8/701)( :8(6:8)+!1!; /6(8:661)! ++1/: 68)::1(0 ,5$"5&>2!3
-..(&%
./0
. .1!2
3$%&4.45.
6%.,!"'()-./01((%2!"'()-33.&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN.XSDUXN5LYHU8QLW.XSDUXN23DG22/2/5.$+/4#6
.!"'()-./01((%2!"'()-37
.5!"'()6<
>@<=>A<=>:;&4<
>:7;& <
>
/0<
>/0 <
>673<>63<>0 <>( <=;B>
/74++8!6/1(+ 0(1;! /61:( :8:!;1/) )8)+01(+ ')8;/)1;/:8/701/) :8(6:8)!61): /6(8:):1(0 ++1(: 68)061(: ,5$"5&>2!3++8!//1+; 0+1:: //1/0 :8:!71;; )8)!:17( ')8;!(1)6:8/7;1;; :8(6:8)/(166 /6(8:7(1): +(16; 68/+71(! ,5$"5&>2!3++8!;/16/ 061)( /0167 :8:!:1;+ )8)/61;7 ')8;(/1+(:8/771;+ :8(6:8)::1); /6(8:0/176 +61); 68/)(1;0 ,5$"5&>2!3++8)+/1+; 0!1)+ :(166 :8:!/1!( )8):710! ')877016;:8/7:1!( :8(6:8);+1:! /6(876+1)0 )1:! 68/:!1;7 ,5$"5&>2!3++8))/16( 0!1:( :+1/6 :8:!!1): )8);61/6 ')87/!1++:8/7)1): :8(6:8)0:1!+ /6(87)71:+ )1!7 68/;:1/! ,5$"5&>2!3++8)7/1!0 0!1(+ :+1!( :8:!+176 )8)0:10) ')876:1:/:8/76176 :8(6:8/+(1;6 /6(877)1(6 61(0 68:(01+) ,5$"5&>2!3++8/(/1+/ 0)1)( :+1); :8:601;( )8/++1+: ')87((1/7:8/7(1;( :8(6:8/6/1+! /6(8;((1() )17+ 68:!+1)+ ,5$"5&>2!3++8/!/1:0 0)1;! :)1;6 :8:671!) )8/6)10+ ')8:7!1)6:8/:;1!) :8(6:8/!;107 /6(8;671+) +(100 68:/!1:6 ,5$"5&>2!3++8/:/1!/ 0)10/ :01() :8:6)1;+ )8/!:1)0 ')8:):16):8/:/1;+ :8(6:8//(1:! /6(8;/)16; +)1+; 68:7!1;( ,5$"5&>2!3++8/0/167 0)1!! 7+1)/ :8:661!0 )8/):1/7 ')8:+;1+7:8/:!1!0 :8(6:8/:(1;+ /6(8;;61!+ ;160 68:061;7 ,5$"5&>2!3++8:6/17+ 0)16+ 7610( :8:6(1+6 )8///1;: ')8/;016;:8/:+1+6 :8(6:8/7(16( /6(80++1+7 )177 687++1); ,5$"5&>2!3++8:/)10: 07167 761/: :8:+716( )8/:)1/( ')8/:+1)0:8//;16( :8(6:8/7;10! /6(80!;10! +(1/! 687601+( ,5$"5&>2!3++8:;)10) 0;107 761!( :8:+610: )8/7!1): ')8/!!1+0:8//!10: :8(6:8/;7100 /6(80:71+0 /17) 687)716( ,5$"5&>2!3++87+)17( 001/! 761:7 :8:(;1+; )8/;61!( ')8/(/1+;:8/)01+; :8(6:8/0:106 /6(800/1+7 616/ 687:/1(0 ,5$"5&>2!3++87))1;7 071(/ 7!16; :8:(!1;! )8/0+1() ')8)7:1:):8/))1;! :8(6:8:(/17: /6+8(6!1:; ;1): 687;!1(: ,5$"5&>2!3++877)106 0:1+! 7/1)6 :8:((1!; )8/001(0 ')8))710(:8/)+1!; :8(6:8:+!10+ /6+8(/61!0 717+ 68;((1): ,5$"5&>2!3++8;+)1+) 071)6 7/1:0 :8/0/17: )8:(;1;( ')8)+(1+;:8/!:17: :8(6:8:6!17/ /6+8(0(1(7 !1!: 68;661)0 ,5$"5&>2!3++8;!:1(+ 0;1(7 7/1/0 :8/061;+ )8:+)1+; ')8!;01+0:8/!!1;+ :8(6:8:6016( /6+8+++1() !1(+ 68;!)176 ,5$"5&>2!3++8;7)1(( 0;1(7 7/1/0 :8/;71)7 )8:6!1/) ')8!/617::8/6;1); :8(6:8:!;1:; /6+8+)71)! (1(( 68;//107 "D$$
&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN
!
"
!#$%#$&'()*&+&,-&
.//(&%
/01
/ /)!2
3$%&4/45/
6%/,!"'()-./01((%2!"'()-33/&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN !"#!"'()2/3%2/3%5/$+/4#6
/!"'()-./01((%2!"'()-37
/5!"'()6 /8
/.69/
/ &&+06723
4$+0672
4$"
"
&3 8
&48 #&49(),&* 5% #%44(3
%/(
%/3/73/%:;&4:7;& "%%%8
%(/!"'()%%(1(((1((:8(668(!(1///6/8/+/1/;(1((4%/%(1((7(<6;=+:17(+
+)0<)7=601;(:545<=>?% 3<0> 3<=>6%763!"'()*++>>,6(+0 )?+?6(6( +:1(: ;(1;7 /78!;:1:(/1/
%7/3!"'()*+++1( 4 4*1 / ?<01><
>:7;& <
><=>:;&4<
>0$/;8:((1((6(1(((1(((1((/01((?<
>
307
<45>0<
>)?+:?6(6(
%"&&'>@" &'&"&&
+((1((;8:((1(( !"'()2!"'()3+?+/?6((+,5$'
A"
*@ ,5$'
A"
*@AB**;8::+10(;8::+10( !"'()*++2!"'()*++3!?6:?6(6( !?67?6(6(
.//(&%
/01
/ /)!2
3$%&4/45/
6%/,!"'()-./01((%2!"'()-33/&RQRFR3KLOOLSV$ODVND,QFB.XSDUXN.XSDUXN5LYHU8QLW.XSDUXN23DG22/3%2/3%5/$+/4#6
/!"'()-./01((%2!"'()-37
/5!"'()6<
>@<=>A<=>:;&4<
>:7;& <
>
01<
>01 <
>673<>63<>1 <>( <=;B>
074;8:((1(( )!1+6 6;!1;+ :8/()1+( 68(:!107 ')87);1)::8))/1+( :8(6)8(7;1(! /6(87:(1// (1+) !+/1)! ,5$'
A"
*@263;8::+10( )6107 6;!1:0 :8/)01!) 68(7)1(6 ')87;01/(:8)0(1!) :8(6)8(;710! /6(87+01); (16; !+(1;! ,5$'
A"
*@263";87/+1(( )6107 6;!1:0 :8:+)1/! 68(;;1!0 ')8;);1/(:8///1/! :8(6)8+(61+( /6(8::(1)! (1(( !()1+: "C$$
Transmittal #1273 Detail
Date: 5/8/2020
To (External Party):From (CPAI Contact):
Email*: abby.bell@alaska.gov Email*: richard.e.elgarico@conocophillips.com
First
Name*:Abby First Name*: Ricky
Last Name*: Bell Last Name*: Elgarico
Phone
Number:(907) 79 Phone Number: (907) 265-6580
Company: AOGCC Company: ConocoPhillips
Address: 333 West 7th Ave.Address: 700 G Street
City: Anchorage City: Anchorage
State: AK State: AK
Zip Code: 99501 Zip Code: 99501
Transmittal Info
Sent Via: FTP Tracking #:
Justification:
Data Detail
Quantity*:Description*:Type*:
1 CD4-215l1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 CD5-23L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 CD5-23L1-01 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 3R-105 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-105L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-107 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-107L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 CD4-214L1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 3O-04L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3O-04L1-01 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
Received by the AOGCC on 05/08/2020
PTD: 2191840
E-Set: 33012
1 3O-04L1PB1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF
Digital
Attachments:
Received By:
___________________________
Signature:
___________________________
Date:
_________________
Approver:
___________________________
Signature:
___________________________
Date:
_________________
Abby Bell Abby Bell 05/08/2020
Transmittal #1273 Detail
Date: 5/8/2020
To (External Party):From (CPAI Contact):
Email*: abby.bell@alaska.gov Email*: richard.e.elgarico@conocophillips.com
First
Name*:Abby First Name*: Ricky
Last Name*: Bell Last Name*: Elgarico
Phone
Number:(907) 79 Phone Number: (907) 265-6580
Company: AOGCC Company: ConocoPhillips
Address: 333 West 7th Ave.Address: 700 G Street
City: Anchorage City: Anchorage
State: AK State: AK
Zip Code: 99501 Zip Code: 99501
Transmittal Info
Sent Via: FTP Tracking #:
Justification:
Data Detail
Quantity*:Description*:Type*:
1 CD4-215l1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 CD5-23L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 CD5-23L1-01 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 3R-105 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-105L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-107 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3R-107L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 CD4-214L1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
1 3O-04L1 LWD Data - CGM, LAS,
PDF, TAPESCAN, TIF Digital
1 3O-04L1-01 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF Digital
Received by the AOGCC 05/08/2020
PTD: 2191840
E-Set: 33010
1 3O-04L1PB1 LWD Data - CGM,
LAS, PDF, TAPESCAN, TIF
Digital
Attachments:
Received By:
___________________________
Signature:
___________________________
Date:
_________________
Approver:
___________________________
Signature:
___________________________
Date:
_________________
Abby Bell Abby Bell 05/08/2020
21 91 84
32 98 2
Letter of Transmittal
Baker Hughes
Date:
S
April 30, 2020
To: -[From.—
m:
Abby Bell Harvey Finch
AOGCC ! Baker Hughes
333 West 7`" Ave, Suite 100 I i 795 East 94`" Avenue
Anchorage, Alaska 99501 Anchorage, Alaska 99515 1
r I
Please find enclosed the directional survey data for the following well(s)-
30-04U PB 1
30-04L1
30-04L1-01
RECEIVED
APR 3 0 2020
AOOCC
(3) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Harvey Finch
I
Baker Hughes
Wellplanner
Harvev.FincNC bakerhughes.com
I
Baker Hughes 5�1 1
Date:
April 30, 2020
To:
Abby Bell
AOGCC
333 West 7th Ave, Suite 100
Anchorage, Alaska 99501
2 1 91 84
3298 1
Letter of Transmittal
'From:
f Harvey Finch
Baker Hughes
795 East 94`h Avenue
Anchorage, Alaska 99515
Please find enclosed the directional survey data for the following well(s):
30-04L1PB1
30-04L1
30-04L1-01
RECEIVE®
APR 3 0 1020
AOGCC
(3) Total prints
Enclosed for each well(s):
1 hardcopy print of directional survey reports (NAD27)
1 compact disk containing electronic survey files
Harvey Finch
Baker Hughes
Wellplanner
Harvev.FinchC@bakerhughes.com
Loepp, Victoria T (CED)
From: Germann, Shane <Shane.Germann@conocophillips.com>
Sent: Monday, December 9, 2019 9:13 AM
To: Loepp, Victoria T (CED)
Cc: Ohlinger, James J
Subject: KRU 30-04 PTD & Sundry Applications
Attachments: 30-04 Proposed Schematic V1.1.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Victoria,
I'm following up after our conversation on Friday concerning the naming of the proposed 30-04 CTD laterals (1-1, 1-1-01,
& 1-1-02). After some research, the 4-1/2" scab liner that was cemented in place on 7/15/2013 was perforated through
to the A2 sand for production. It was perforated on 3 occasions (7/18/2013, 1/5/2015, & 8/8/2016) from 8675'— 8695'
MD. The original CTD schematic sent with the PTD applications made it unclear if the cemented scab liner had been
perforated, so I've updated and attached the schematic to show these perforations. I believe this would make the L1,
1-1-01, and L1-02 naming convention correct.
Please let me know if you have any questions or would like to discuss further.
Shane Germann
Coiled Tubing Drilling Engineer
Office: 907-263-4597
Cell: 406-670-1939
700 G St, ATO 664, Anchorage, AK 99501
THE STATE
°'ALASKA
GOVERNOR MIKE DUNLEAVY
James Ohlinger
Staff CTD Engineer
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.aogcc.alaska.gov
Re: Kuparuk River Field, Kuparuk Oil Pool, KRU 30-04L1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 219-184
Surface Location: 789' FNL, 1879' FWL, Sec. 22, T13N, R9E, UM
Bottomhole Location: 1457' FNL, 2179' FEL, Sec. 16, T13N, R9E, UM
Dear Mr. Ohlinger:
Enclosed is the approved application for the permit to drill the above referenced development well.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs
run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment
of this well.
This permit to drill does not exempt you from obtaining additional permits or an approval required
by law from other governmental agencies and does not authorize conducting drilling operations
until all other required permits and approvals have been issued. In addition, the AOGCC reserves
the right to withdraw the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply
with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code,
or an AOGCC order, or the terms and conditions of this permit may result in the revocation or
suspension of the permit.
Sincerely,
Price
Chair
DATED this \�5 day of December, 2019.
STATE OF ALASKA
ALA k OIL AND GAS CONSERVATION COMM 1,' /N
PERMIT TO DRILL
20 AAC 25.005
H L.170
Lr__ a fir..
DEC - 6 2019
1 a. Type of Work:
Drill El Lateral ❑�
Redrill ❑ Reentry ❑
1 b. Proposed Well Class: Exploratory -Gas ❑
Stratigraphic Test ❑ Development Oil ❑�
Exploratory - Oil ❑ Development - Gas ❑
Service - WAG ❑ Service - Disp ❑
Service Winj ❑ Single Zone ❑Q
Service - Supply ❑ Multiple Zone ❑
1 c. for:
Coalbed Gas LJ Gas Hydrates ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
5. Bond: Blanket 0 Single Well ❑
Bond No. 5952180
11. Well Name and Number:
KRU 30-04L1
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
6. Proposed Depth:
MD: 12,000' TVD{5', 6503'
12. Field/Pool(s):
Kuparuk River Pool /
Kuparuk River Oil Pool
4a. Location of Well (Governmental Section):
Surface: 789' FNL, 1879' FWL, Sec. 22, T13N, R9E, UM
Top of Productive Horizon:
1286' FSL, 2365' FWL, Sec. 16, T13N, R9E, UM
Total Depth:
1457' FNL, 2179' FEL, Sec. 16, T13N, R9E, UM
7. Property Designation: r
ADL 25513
8. DNR Approval Number:
LONS 85-100
13. Approximate Spud Date:
12/17/2019
9. Acres in Property:
2560
14. Distance to Nearest Property:
7445'
4b. Location of Well (State Base Plane Coordinates - NAD 27):
Surface: x- 524964— y- �858fiB2— gn Zone- 4
10. KB Elevation above MSL (ft): 59'
GL / BF Elevation above MSL (ft): 19'
15. Distance to Nearest Well Open
to Same Pool: 21' (3R-26)
16. Deviat a s. ' iso ept 675 feet
Pte'' k k d Maximum Hole Angle: 101 degrees
17. MaIle—ximum Potential Pressures in psig (see 20 AAC 25.035)
Downhole: 4244 Surface: 3588
18. Casing ProgranV Specifications
Top - Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade I Coupling Length
MD TVD MD TVD (including stage data)
3" 2-3/8" 4.7# L-80 ST -L 2750'
9250' 6549' 12000' 6503' Slotted Liner
19. PRESENT WELL CONDITION SUMMARY (To be completed for Redrill and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured):
8,984 6785 8694
Effect. Depth MD (ft): Effect. Depth TVD (ft): Junk (measured):
8,850 6687 N/A
Casing Length Size
Cement Volume MD TVD
Conductor 80' 16"
199 Sx ASI II 115' 115'
Surface 5064' 9-5/8"
1200 Sx ASI II, 375 Sx Class G 5099' 4029'
Production 8928' 7'
300 Sx Class G, 175 Sx ASI 8961' 6799'
Liner 899' 4-1/2"
28 bbls Class G 8850' 6687'
Perforation Depth MD (ft): 8675'- 8695'
Perforation Depth TVD (ft): 6559'-6573
Hydraulic Fracture planned? ❑ 0
20. Attachments: Property Plat El BOP Sketch
Diverter Sketch
Drilling Program
Seabed Report
Time v. Depth Plot
H Drilling Fluid Program
Shallow Hazard Analysis
20 AAC 25.050 requirements✓
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval. Contact Name: Shane Germann
Authorized Name: James Ohlinger Contact Email: Shane. Germann COP. corn
Authorized Title: St ff CTD Engineer Contact Phone: 907-263-4597
Authorized Signature: ZJDate:
Commission Use Only
Permit to Drill
Number: — I
API Number:
50- O2 Q—Z ( G _ 6-0— C)o I
Permit Approval
Date:
I
See cover letter for other
requirements.
Conditions of approval : If box is checked, well may not be used to explore for, test, or produce coalbed methane, gas hydrates, or gas contained in shales: [�
Other: SOP 7LCSfl—CSSU�C Samples req'd: Yes E]No[- Mud log req'd: Yes❑ No[V
�o g DUO �S
/l H2S measures: Yes [ir]�No❑ Directional svy req'd: Yes M"No❑
S�cing exception req'd: Yes [:1NoW inclination -only svy req'd: Yes[:] No
f0 Z �0p,P5 Post initial injection MIT req'd: Yes ❑ No Er
APPROVED BY
Approved by: COMMISSIONER THE COMMISSION Date.
a , A I P%L. /i 1 l 1 Submit Form and
Form 10-401 Rev eq 5 241 i This permit is val d for 24 months from the date of approval per 20 AAC 25.005(8 Attach ents in Duplicate
v ✓ I J� I 1 (', I l `1 /� �a/l l A7
`i
ConocoPhillips
Alaska
P.O. BOX 100360
ANCHORAGE, ALASKA 99510-0360
December 5, 2019
Commissioner - State of Alaska
Alaska Oil & Gas Conservation Commission
333 West 7th Avenue Suite 100
Anchorage, Alaska 99501
Dear Commissioner:
ConocoPhillips Alaska, Inc. hereby submits applications for permits to drill three laterals out of the KRU 30-04
(PTD# 188-062) using the coiled tubing drilling rig, Nabors CDR3-AC.
CTD operations are scheduled to begin in mid December 2019. The objective will be to drill three laterals, KRU
30-041-1, 30-041-1-01 and 30-041-1-02, targeting the KuparukA-sand interval.
It
To account for geological uncertainties, ConocoPhillips requests a variance from the requirements of 20
AAC 25.015 to allow the actual kick-off point to be anywhere along the length of the parent lateral instead of
being limited to 500' from the original point.
Attached to permit to drill applications are the following documents:
— Permit to Drill Application Forms (10-401) for 30-041-1, 30-04L1-01 and 30-041-1-02
— Detailed Summary of Operations
— Directional Plans for 30-04L1, 30-041-1-01 and 30-041-1-02
— Current Wellbore Schematic
— Proposed CTD Schematic
If you have any questions or require additional information, please contact me at 907-263-4597.
Sincerely,
Shane Germann
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Kuparuk CTD Laterals
30-041-1, 30-041-1-01 & 30-041-1-02
Application for Permit to Drill Document
1.
Well Name and Classification........................................................................................................ 2
(Requirements of 20 AAC 25.005(0 and 20 AAC 25.005(b))................................................................................................................... 2
2.
Location Summary.......................................................................................................................... 2
(Requirements of 20 AAC 25.005(c)(2)).................................................................................................................................................. 2
3.
Blowout Prevention Equipment Information................................................................................. 2
(Requirements of 20 AAC 25.005(c)(3))................................................................................................................................................. 2
4.
Drilling Hazards Information and Reservoir Pressure.................................................................. 2
(Requirements of 20 AAC 25.005(c)(4))................................................................................................................................................. 2
5.
Procedure for Conducting Formation Integrity tests................................................................... 2
(Requirements of 20 AAC 25.005(c)(5)).................................................................................................................................................. 2
6.
Casing and Cementing Program.................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(6)).................................................................................................................................................. 3
7.
Diverter System Information.......................................................................................................... 3
(Requirements of 20 AAC 25.005(c)(7)).................................................................................................................................................. 3
8.
Drilling Fluids Program.................................................................................................................. 3
(Requirements of 20 AAC 25.005(c)(8)).................................................................................................................................................. 3
9.
Abnormally Pressured Formation Information............................................................................. 4
(Requirements of 20 AAC 25.005(c)(9)).................................................................................................................................................. 4
10.
Seismic Analysis............................................................................................................................. 4
(Requirements of 20 AAC 25.005(c)(10))................................................................................................................................................ 4
11.
Seabed Condition Analysis............................................................................................................ 4
(Requirements of 20 AAC 25,005(c) (11))................................................................................................................................................ 4
12.
Evidence of Bonding...................................................................................................................... 4
(Requirements of 20 AAC 25.005(c)(12))................................................................................................................................................ 4
13. Proposed Drilling Program............................................................................................................. 4
(Requirements of 20 AAC 25.005(c)(13))................................................................................................................................................ 4
Summaryof Operations...................................................................................................................................................4
LinerRunning...................................................................................................................................................................6
14. Disposal of Drilling Mud and Cuttings.......................................................................................... 6
(Requirements of 20 AAC 25.005(c)(14))................................................................................................................................................ 6
15. Directional Plans for Intentionally Deviated Wells....................................................................... 6
(Requirements of 20 AAC 25.050(b))...................................................................................................................................................... 6
16. Attachments.................................................................................................................................... 6
Attachment 1: Directional Plans for 30-041-1, 30-04L1-01 & 30-041-1-02 laterals.........................................................6
Attachment 2: Current Well Schematic for 2M-21...........................................................................................................6
Attachment 3: Proposed Well Schematic for 30-041-1, 30-041-1-01 & 30-04L1-02 laterals...........................................6
Page 1 of 6 December 3, 2019
PTD Application: 30-%,,L-1, 30-041-1-01 & 30-041-1-02
1. Well Name and Classification
(Requirements of 20 AAC 25.005(1) and 20 AAC 25.005(b))
The proposed laterals described in this document are 30-041-1, 30-041-1-01 & 30-041-1-02. All laterals will be
classified as "Development' wells.
2. Location Summary
(Requirements of 20 AAC 25.005(c)(2))
These laterals will target the A sand package in the Kuparuk reservoir. See attached 10-401 form for surface
and subsurface coordinates of the 30-041-1, 30-041-1-01 & 30-041-1-02.
3. Blowout Prevention Equipment Information
(Requirements of 20 AAC 25.005 (c)(3))
Please reference blowout prevention (BOP) schematics on file with the Commission for Nabors CDR3-AC.
BOP equipment is as required per 20 AAC 25.036 for thru-tubing drilling operations.
— Pipe rams, blind rams and the CT pack off will be pressure tested to 250 psi and to 4,000 psi. Using the
maximum formation pressure in the area of 4244 psi in 30-10 (i.e. 13.1 ppg EMW), the maximum
potential surface pressure in 30-04, assuming a gas gradient of 0.1 psi/ft, would be 3588 psi. See the
"Drilling Hazards Information and Reservoir Pressure" section for more details.
— The annular preventer will be tested to 250 psi and 2,500 psi.
4. Drilling Hazards Information and Reservoir Pressure
(Requirements of 20 AAC 25.005 (c)(4))
Reservoir Pressure and Maximum Downhole Pressure (Requirements of 20 AAC 25.005 (c)(4)(a))
The formation pressure in KRU 30-04 was measured at the datum to be 3893 psi (11.82 ppg EMW) on
9/26/2019. The maximum downhole pressure in the 30-04 vicinity is to the south in the 30-10. Pressure was
measured to be 4244 psi, at the datum, (13.1 ppg EMW) in June of 2019.
Potential Gas Zones (Requirements of 20 AAC 25.005 (c)(4)(b))
The offset injection wells to 30-04 have injected gas, so there is a possibility of encountering free gas while
drilling the 30-04 laterals. If gas is detected in the returns the contaminated mud can be diverted to a storage
tank away from the rig.
Potential Causes of Hole Problems (Requirements of 20 AAC 25.005 (c)(4)(c))
The major expected risk of hole problems in the 2M-21 laterals will be shale instability across faults. Managed
pressure drilling (MPD) will be used to reduce the risk of shale instability associated with fault crossings.
5. Procedure for Conducting Formation Integrity tests
(Requirements of 20 AAC 25.005(c)(5))
The 30-04 laterals will be drilled under 20 AAC 25.036 for thru-tubing drilling operations so a formation integrity
test is not required.
Page 2 of 6 December 3, 2019
PTD Application: 30-6,L1, 30-041-1-01 & 30-041-1-02
6. Casing and Cementing Program
(Requirements of 20 AAC 25.005(c)(6))
New Completion Details
Lateral Name
Liner Top
Liner Btm
Liner Top
Liner Btm
Liner Details
Btm MD
MD
MD
TVDSS
TVDSS
Conductor
30-04L1
9250'
12,000'
6549'
6503'
2-3/8", 4.7#, L-80, ST -L slotted liner;
Surface
115'
1640
670
Surface
aluminum billet on to
30-041_1-01
8775'
12,000'
6550'
6523'
2-3/8", 4.7#, L-80, ST -L slotted liner,-
iner;aluminum
4029'
3520
2020
Production
7"
aluminumbillet on to
30-041-1-02
8670'
10,350'
6496'
6478'
2-3/8", 4.7#, L-80, ST -L slotted liner;
4980
4320
Liner
4-1/2"
12.6
deployment sleeve on top
Existing Casing/Liner Information
Category
OD
Weight
(Ppf)TVD
Grade
Connection
Top MD
Btm MD
Top
Btm
TVD
Burst
psi
Collapse
psi
Conductor
16"
62.5
H-40
Welded
Surface
115'
Surface
115'
1640
670
Surface
9-5/8"
36.0
J-55
BTC
Surface
5099'
Surface
4029'
3520
2020
Production
7"
26.0
J-55
BTC
Surface
8961'
Surface
6769'
4980
4320
Liner
4-1/2"
12.6
L-80
IBTM
7951'
8850'
6038'
6687'
8430
7500
7. Diverter System Information
(Requirements of 20 AAC 25.005(c)(7))
Nabors CDR3-AC will be operating under 20 AAC 25.036, for thru-tubing drilling operations. Therefore, a
diverter system is not required.
8. Drilling Fluids Program
(Requirements of 20 AAC 25.005(c)(8))
Diagram of Drilling System
A diagram of the Nabors CDR3-AC mud system is on file with the Commission.
Description of Drilling Fluid System
— Window milling operations: Water -Based PowerVis milling fluid (8.6 ppg)
— Drilling operations: Water-based PowerVis mud (8.6 ppg). This mud weight will not hydrostatically
overbalance the reservoir pressure, overbalanced conditions will be maintained using MPD practices
described below.
— Completion operations: The well will be loaded with 11.8 ppg NaCl / NaBr completion fluid in order to
provide formation over -balance and well bore stability while running completions.
Managed Pressure Drilling Practice
Managed pressure drilling (MPD) techniques will be employed to maintain a constant overbalanced pressure on
the open hole formation and promote wellbore stability throughout the coiled tubing drilling (CTD) process. Mud
weight is not, in many cases, the primary well control barrier. This is satisfied with the 5,000 psi rated coiled
tubing pack off and MPD choke. BOPE equipment provides the secondary well control as detailed in section 3
"Blowout Prevention Equipment Information".
In the 30-04 laterals we will target a constant BHP of 11.8 ppg EMW at the window. The constant BHP target
will be adjusted through choke pressure and/or mud weight increases to maintain overbalanced conditions if
increased reservoir pressure is encountered. Additional choke pressure or increased mud weight may also be
employed for improved borehole stability. Any change of circulating friction pressure due to change in pump rates
or change in depth of circulation will be offset with back pressure adjustments.
Page 3 of 6 December 3, 2019
PTD Application: 30-%,,L.1, 30-041-1-01 & 30-041-1-02
Pressure at the 30-04 Window (8675' MD, 6558' TVD) Using MPD
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
KRU well 30-04 is a Kuparuk A -Sand producer equipped with 3-1/2" tubing and 4-1/2" liner. The CTD sidetrack
will utilize three laterals to target the A -sands to the north and east of 30-04. The laterals will increase A -sand
resource recovery and throughput.
Prior to CTD rig up, E -Line will set a mechanical whipstock (TTWS) inside the 442" liner at the planned kick off
point of 8675' MD. The 30-041-1 lateral will exit through the 4-1/2" liner and 7" casing at 8675' MD and drill to a
planned TD at 12,000' MD, targeting the A sand to the north. The lateral will be completed with 2-3/8" slotted liner
from TD up to 9250' MD with an aluminum billet for kicking off.
The 30-04L1-01 lateral will kick off at 9250' MD and drill to a planned TD of 12,000' MD targeting the A sand to
the north. It will be completed with 2-3/8" slotted liner from TD up to 8775' MD with an aluminum billet for kicking
off.
The 30-041_1-02 lateral will kick off at 8775' MD and drill to a planned TD of 10,350' MD targeting the A sand to
the east. It will be completed with 2-3/8" slotted liner from TD up into the 4-1/2" liner at 8670' MD with a
deployment sleeve.
Page 4 of 6 December 3, 2019
Pumps On 1.9 bpm)
Pumps Off
A -sand Formation Pressure 11.8
4023 psi
4023 psi
Mud Hydrostatic 8.6
2933 psi
2933 psi
Annular friction i.e. ECD, 0.080psi/ft)
694 psi
0 psi
Mud + ECD Combined
no chokepressure)
3627 psi
(underbalanced -396psi)
2933 psi
(underbalanced 1090psi)
Target BHP at Window 11.8
4024 psi
4024 psi
Choke Pressure Required to Maintain
Target BHP
397 psi
1091 psi
9. Abnormally Pressured Formation Information
(Requirements of 20 AAC 25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis
(Requirements of 20 AAC 25.005(c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis
(Requirements of 20 AAC 25.005(c)(11))
N/A - Application is for a land based well.
12. Evidence of Bonding
(Requirements of 20 AAC 25.005(c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program
(Requirements of 20 AAC 25.005(c)(13))
Summary of Operations
KRU well 30-04 is a Kuparuk A -Sand producer equipped with 3-1/2" tubing and 4-1/2" liner. The CTD sidetrack
will utilize three laterals to target the A -sands to the north and east of 30-04. The laterals will increase A -sand
resource recovery and throughput.
Prior to CTD rig up, E -Line will set a mechanical whipstock (TTWS) inside the 442" liner at the planned kick off
point of 8675' MD. The 30-041-1 lateral will exit through the 4-1/2" liner and 7" casing at 8675' MD and drill to a
planned TD at 12,000' MD, targeting the A sand to the north. The lateral will be completed with 2-3/8" slotted liner
from TD up to 9250' MD with an aluminum billet for kicking off.
The 30-04L1-01 lateral will kick off at 9250' MD and drill to a planned TD of 12,000' MD targeting the A sand to
the north. It will be completed with 2-3/8" slotted liner from TD up to 8775' MD with an aluminum billet for kicking
off.
The 30-041_1-02 lateral will kick off at 8775' MD and drill to a planned TD of 10,350' MD targeting the A sand to
the east. It will be completed with 2-3/8" slotted liner from TD up into the 4-1/2" liner at 8670' MD with a
deployment sleeve.
Page 4 of 6 December 3, 2019
PTD Application: 30-u,L.1, 30-041_1-01 & 30-041_1-02
CTD Drill and Complete 30-04 Laterals:
Pre -CTD Work
1. RU Slickline: Dummy whipstock drift, C/O GLV's
2. RU E -Line: Caliper, set top of whipstock at 8675' MD
3. Prep site for Nabors CDR3-AC.
Rig Work
1. MIRU Nabors CDR3-AC rig using 2" coil tubing. NU 7-1/16" BOPE, test.
30-041-1 Lateral (A sand - North)
a. Mill 2.80" window at 8675' MD.
b. Drill 3" bi-center lateral to TD of 12,000' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 9250' MD.
3. 30-041-1-01 Lateral (A sand - North)
a. Kick off of the aluminum billet at 9250' MD.
b. Drill 3" bi-center lateral to TD of 12,000' MD.
c. Run 2-3/8" slotted liner with an aluminum billet from TD up to 8775' MD.
4. 30-041-1-02 Lateral (A sand - East)
a. Kick off of the aluminum billet at 8775' MD.
b. Drill 3" bi-center lateral to TD of 10,350' MD.
c. Run 2-3/8" slotted liner with deployment sleeve from TD up to 8670' MD
5. Obtain SBHP, freeze protect, ND BOPE, and RDMO Nabors CRD3-AC.
Post -Rig Work
1. Return to production
Pressure Deployment of BHA
The planned bottom hole assemblies (BHAs) are too long to simply isolate by closing the double swab valves on
the Christmas tree. MPD operations require the BHA to be lubricated under pressure using a system of double
swab valves on the Christmas tree, double deployment rams, double check valves and double ball valves in the
BHA, and a slick -line lubricator can be used. This pressure control equipment listed ensures there are always two
barriers to reservoir pressure, both internal and external to the BHA, during the deployment process.
During BHA deployment, the following steps are observed.
— Initially the double swab valves on the tree are closed to isolate reservoir pressure. The lubricator is
installed on the BOP riser with the BHA inside the lubricator.
— Pressure is applied to the lubricator to equalize across the swab valves. The swab valves are opened and
the BHA is lowered in place via slick -line.
— When the BHA is spaced out properly, the double deployment rams are closed on the BHA to isolate
reservoir pressure via the annulus. A closed set of double ball valves and double check valves isolate
reservoir pressure internal to the BHA. Slips on the double deployment rams prevent the BHA from
moving when differential pressure is applied. The lubricator is removed once pressure is bled off above
the deployment rams.
— The coiled tubing is made up to the BHA with the double ball valves plus the double check valves in the
closed position. Pressure is applied to the coiled tubing to equalize internal pressure and then the
double ball valves are opened. The injector head is made up to the riser, annular pressure is equalized,
and the deployment rams are opened. The BHA and coiled tubing are now ready to run in the hole.
During BHA undeployment, the steps listed above are observed, only in reverse.
Page 5 of 6 December 3, 2019
PTD Application: 30-u,L-1, 30-041_1-01 & 30-041_1-02
Liner Running
- The 30-04 laterals will be displaced to an overbalancing fluid (11.8 ppg NaCl / NaBr) prior to running
liner. See "Drilling Fluids" section for more details.
- While running 2-3/8" slotted liner, a joint of 2-3/8" non -slotted tubing will be standing by for
emergency deployment. A floor valve is made up onto this joint ahead of time, and the rig crew
conducts a deployment drill with this emergency joint on every slotted liner run. The 2-3/8" rams will
provide secondary well control while running 2-3/8" liner.
14. Disposal of Drilling Mud and Cuttings
(Requirements of 20 AA 25.005(c)(14))
• No annular injection on this well.
• All solid waste will be transported to the grind and inject facility at DS -4 Prudhoe Bay for disposal.
• Incidental fluids generated from drilling operations will be injected in a Kuparuk Class II disposal well (1 R-18
or 1 B disposal facilities) or Prudhoe DS -4 if a Kuparuk facility is unavailable.
• All wastes and waste fluids hauled from the pad must be properly documented and manifested.
• Contact Kuparuk Environmental Coordinator for questions regarding waste classification. (670-4200).
15. Directional Plans for Intentionally Deviated Wells
(Requirements of 20 AAC 25.050(b))
- The Applicant is the only affected owner.
- Please see Attachment 1: Directional Plans
- Magnetic and inclination surveys will be taken every 30 ft. No gyro will be run.
- MWD directional, resistivity, and gamma ray will be run over the entire open hole section.
- Distance to Nearest Property Line (measured to KPA boundary at closest point)
Lateral Name Distance
30-04L1
7445'
30-04L1-01
7450'
30-04L1-02
7920'
- Distance to Nearest Well within Pool
Lateral Name
Distance
Well
30-04L1
21'
3R-26
30-04L1-01
42'
3R-26
30-04L1-02
1739'
30-02
16.Attachments
Attachment 1: Directional Plans for30-04L1, 30-04L1-01 & 30-04L1-02 laterals
Attachment 2: Current Well Schematic for 30-04
Attachment 3: Proposed Well Schematic for 30-04L1, 30-04L1-01 & 30-04L1-02 laterals
Page 6 of 6 December 3, 2019
Welli KRU XX-XX Nabors CDR3-AC: 4-Ram BOP Configuration 2" Date April 24, 2019
Coiled Tubing and 2-3/8" BHA
Quick Test Sub to Ot
Top of 7" Otis
Distances from top o
Excluding quick -test
Top of Annular
CL Annular
Bottom Annular Flani
CL Blind/Shears
CL 2" Combi's
CL 2-3/8" Combi's
CL 2" Combi's
CL of Top S
Top of Swa
CL Swab 1
Flow Tee
CL SSV
CL Master
LDS
Ground
Tree Size 3 1i8
ne
ConocoPhilli s
p
ConocoPhillips Alaska Inc—Kuparuk
Kuparuk River Unit
Kuparuk 30 Pad
30-04
30-041-1
Plan: 30-041-1_wp02
Standard Planning Report
04 December, 2019
Baker Hughes g
ConocoPhillips
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaska Inc–Kuparuk
Project:
Kuparuk River Unit
Site:
Kuparuk 30 Pad
Well:
30-04
Wellbore:
30-041-1
Design:
30-04L1_wp02
ConocoPhillips
Planning Report
Baker Hughes
Local Co-ordinate Reference:
Well 30-04
TVD Reference:
Mean Sea Level
MD Reference:
30-04: @ 59.00usft (30-04:)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Project Kuparuk River Unit, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
Site Kuparuk 30 Pad
Site Position: Northing:
From: Map Easting:
Position Uncertainty: 0.00 usft Slot Radius:
Well 30-04 —
Well Position +N/ -S 0.00 usft Northing:
+E/ -W 0.00 usft Easting:
Position Uncertainty 0.00 usft Wellhead Elevation:
Wellbore 30-041-1
Magnetics Model Name Sample Date
BGGM2018 12/30/2019
6,022,094.67 usft Latitude:
525,478.25 usft Longitude:
0.000 in Grid Convergence
6,022,030.55 usft Latitude:
525,515.58 usft Longitude:
usft Ground Level:
Declination
16.28
Dip Angie
t°)
80.92
70° 28' 17.333 N
149° 47'30.897 W
0.20 °
700 28' 16.701 N
149° 47'29.806 W
0.00 usft
Field Strength
(nT)
57,401
Design 30-041-1_wp02
Audit Notes:
Version: Phase: PLAN Tie On Depth: 8,600.00
Vertical Section: Depth From (TVD) +NI -S +E/ -W Direction
(usft) (usft) (usft) (I
0.00 0.00 0.00 20.00
12/4/2019 3.14:02PM Page 2 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Planning Report Baker Hughes
Database:
EDT 14 Alaska Production
Company:
ConocoPhillips Alaska Inc_Kuparuk
Project:
Kuparuk River Unit
Site:
Kuparuk 30 Pad
Well:
30-04
Wellbore:
30-041-1
Design:
30-04L1_wp02
Local Co-ordinate Reference
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Plan Sections
Build
Turn
Rate
Rate
Measured
TFO
(°I100usft)
TVD Below
(°/100usft)
C)
Depth
Inclination
Azimuth
System
+N/ -S
+E/ -W
(usft)
(°)
(°)
(usft)
(usft)
(usft)
8,600.00
43.12
283.81
6,445.10
2,063.97
-4,748.46
8,675.00
42.93
283.66
6,499.93
2,076.12
-4,798.17
8,700.00
48.18
283.66
6,517.43
2,080.34
-4,815.50
8,799.57
90.00
283.66
6,552.18
2,101.82
-4,903.89
8,869.57
90.00
313.06
6,552.18
2,134.71
-4,964.82
8,950.00
91.92
318.35
6,550.83
2,192.24
-5,020.95
9,050.00
91.91
325.36
6,547.48
2,270.80
-5,082.65
9,275.00
86.52
340.16
6,550.59
2,470.18
-5,185.32
9,500.00
79.30
354.28
6,578.48
2,687.17
-5,234.76
9,700.00
90.11
3.23
6,596.94
2,885.78
-5,238.95
9,950.00
93.10
20.48
6,589.88
3,129.41
-5,187.85
10,300.00
90.75
356.07
6,577.94
3,472.93
-5,137.93
10,700.00
88.32
23.97
6,581.24
3,862.91
-5,069.03
10,950.00
90.79
41.30
6,583.19
4,072.61
-4,934.73
11,200.00
100.70
55.82
6,558.05
4,236.81
-4,749.19
11,400.00
93.11
43.96
6,533.94
4,364.53
-4,597.84
11,750.00
92.83
68.49
6,515.54
4,557.35
-4,309.52
12,000.00
92.70
86.01
6,503.40
4,612.24
-4,066.92
Well 30-04
Mean Sea Level
30-04: @ 59.00usft (30-04)
True
Minimum Curvature
Dogleg
Build
Turn
Rate
Rate
Rate
TFO
(°I100usft)
(°/100usft)
(°/100usft)
C)
0.00
0.00
0.00
0.00
0.29
-0.25
-0.20
-151.75
21.00
21.00
0.00
0.00
42.00
42.00
0.00
0.00
42.00
0.00
42.00
90.00
7.00
2.39
6.58
70.00
7.00
-0.01
7.00
90.00
7.00
-2.40
6.58
110.00
7.00
-3.21
6.27
118.00
7.00
5.41
4.47
40.00
7.00
1.20
6.90
80.00
7.00
-0.67
-6.97
-95.00
7.00
-0.61
6.97
95.00
7.00
0.99
6.93
82.00
7.00
3.96
5.81
55.00
7.00
-3.80
-5.93
-122.00
7.00
-0.08
7.01
90.00
7.00
-0.05
7.01
90.00
Target
121412019 3:14:02PM Page 3 COMPASS 5000 14 Build 85H
ConocoPhillips
`
ConocoPhillips
Planning Report
Baker Hughes
Database: EDT 14 Alaska Production
Local Co-ordinate
Reference:
Well 30-04
Company: ConocoPhillips Alaska Inc_Kuparuk
TVD Reference:
Mean
Sea Level
Project: Kuparuk River Unit
MD Reference:
30-04: @ 59.00usft
(30-04)
Site: Kuparuk 30 Pad
North Reference:
True
Well: 30-04
Survey Calculation Method:
Minimum Curvature
Wellbore: 30-041-1
Design: 30-04L1_wp02
Planned Survey
I Measured
TVD Below
Vertical
Dogleg
Toolface
Map
Map
Depth Inclination Azimuth
System
+N/ -S
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft) (°) I')
(usft)
(usft)
(usft)
(usft)
(°/100usft)
(°)
(usft)
(usft)
8,600.00 43.12 283.81
6,445.10
2,063.97
-4,748.46
315.43
0.00
0.00
6,024,078.03
520,760.55
TIP
8,675.00 42.93 283.66
6,499.93
2,076.12
-4,798.17
309.85
0.29
-151.75
6,024,090.01
520,710.80
KOP
8,700.00 48.18 283.66
6,517.43
2,080.34
-4,815.50
307.88
21.00
0.00
6,024,094.16
520,693.45
Start Build 42.00
8,799.57 90.00 283.66
6,552.18
2,101.82
-4,903.89
297.83
42.00
0.00
6,024,115.34
520,605.00
Start DLS 42.00 TFO 90.00
8,800.00 90.00 283.84
6,552.18
2,101.92
-4,904.31
297.79
42.00
90.00
6,024,115.44
520,604.58
8,869.57 90.00 313.06
6,552.18
2,134.71
-4,964.82
307.90
42.00
90.00
6,024,148.01
520,543.97
Start DLS 7.00 TFO 70.00
8,900.00 90.73 315.06
6,551.99
2,155.87
-4,986.68
320.31
7.00
70.00
6,024,169.10
520,522.03
8,950.00 91.92 318.35
6,550.83
2,192.24
-5,020.95
342.77
7.00
70.01
6,024,205.35
520,487.64
Start DLS 7.00 TFO 90.00
9,000.00 91.92 321.85
6,549.16
2,230.58
-5,053.00
367.83
7.00
90.00
6,024,243.57
520,455.46
9,050.00 91.91 325.36
6,547.48
2,270.80
-5,082.65
395.48
7.00
90.12
6,024,283.69
520,425.68
Start DLS 7.00 TFO 110.00
9,100.00 90.71 328.65
6,546.34
2,312.71
-5,109.87
425.56
7.00
110.00
6,024,325.50
520,398.32
9,200.00 88.31 335.22
6,547.20
2,400.89
-5,156.89
492.34
7.00
110.08
6,024,413.51
520,351.01
9,275.00 86.52 340.16
6,550.59
2,470.18
-5,185.32
547.73
7.00
110.02
6,024,482.70
520,322.34
Start DLS 7.00 TFO 118.00
9,300.00 85.70 341.71
6,552.29
2,493.76
-5,193.47
567.09
7.00
118.00
6,024,506.24
520,314.11
9,400.00 82.45 347.95
6,562.62
2,589.69
-5,219.49
648.34
7.00
117.89
6,024,602.08
520,287.76
9,500.00 79.30 354.28
6,578.48
2,687.17
-5,234.76
734.73
7.00
117.25
6,024,699.50
520,272.16
Start DLS 7.00 TFO 40.00
9,600.00 84.69 358.79
6,592.41
2,785.96
-5,240.71
825.51
7.00
40.00
6,024,798.25
520,265.87
9,700.00 90.11 3.23
6,596.94
2,885.78
-5,238.95
919.92
7.00
39.37
6,024,898.07
520,267.29
Start DLS 7.00 TFC, 80.00
9,800.00 91.32 10.12
6,595.69
2,985.03
-5,227.34
1,017.16
7.00
80.00
6,024,997.35
520,278.56
9,900.00 92.52 17.02
6,592.33
3,082.12
-5,203.90
1,116.41
7.00
80.09
6,025,094.51
520,301.66
9,950.00 93.10 20.48
6,589.88
3,129.41
-5,187.85
1,166.33
7.00
80.32
6,025,141.84
520,317.55
Start DLS 7.00 TFO -95.00
10,000.00 92.79 16.99
6,587.31
3,176.69
-5,171.82
1,216.24
7.00
-95.00
6,025,189.18
520,333.42
10,100.00 92.14 10.01
6,583.01
3,273.77
-5,148.51
1,315.45
7.00
-95.18
6,025,286.33
520,356.39
10,200.00 91.46 3.04
6,579.87
3,373.01
-5,137.16
1,412.58
7.00
-95.48
6,025,385.60
520,367.40
10,300.00 90.75 356.07
6,577.94
3,472.93
-5,137.93
1,506.21
7.00
-95.70
6,025,485.51
520,366.28
Start DLS 7.00 TFO 95.00
10,400.00 90.14 3.05
6,577.16
3,572.86
-5,138.70
1,599.85
7.00
95.00
6,025,585.42
520,365.17
10,500.00 89.52 10.02
6,577.46
3,672.15
-5,127.33
1,697.04
7.00
95.05
6,025,684.74
520,376.21
10,600.00 88.91 16.99
6,578.82
3,769.32
-5,103.99
1,796.33
7.00
95.03
6,025,781.97
520,399.21
10,700.00 88.32 23.97
6,581.24
3,862.91
-5,069.03
1,896.24
7.00
94.94
6,025,875.68
520,433.85
Start DLS 7.00 TFO 82.00
10,800.00 89.30 30.90
6,583.32
3,951.58
-5,022.99
1,995.31
7.00
82.00
6,025,964.50
520,479.58
10,900.00 90.30 37.83
6,583.66
4,034.08
-4,966.57
2,092.12
7.00
81.86
6,026,047.18
520,535.70
10,950.00 90.79 41.30
6,583.19
4,072.61
-4,934.73
2,139.23
7.00
81.83
6,026,085.82
520,567.41
Start DLS 7.00 TFO 55.00
11,000.00 92.80 44.17
6,581.62
4,109.32
-4,900.82
2,185.31
7.00
55.00
6,026,122.64
520,601.19
11,100.00 96.79 49.94
6,573.26
4,177.17
-4,827.93
2,274.01
7.00
55.09
6,026,190.74
520,673.84
11,200.00 100.70 55.82
6,558.05
4,236.81
-4,749.19
2,356.98
7.00
55.57
6,026,250.63
520,752.37
Start DLS 7,00 TFO -122.00
11,300.00 96.94 49.84
6,542.70
4,296.49
-4,670.52
2,439.97
7.00
-122.00
6,026,310.58
520,830.83
11,400.00 93.11 43.96
6,533.94
4,364.53
-4,597.84
2,528.76
7.00
-122.92
6,026,378.86
520,903.26
1214/2019 3:14:02PM
Page 4
COMPASS 5000 14 Build 85H
ConocoPhillips
Database:
EDT 14 Alaska Production
TVD Reference:
Company:
ConocoPhillips Alaska Inc Kuparuk
30-04: @ 59.00usft (30-04:)
Project:
Kuparuk River Unit
Survey Calculation Method:
Minimum Curvature
Site:
Kuparuk 30 Pad
(usft)
(usft)
Well:
30-04
(usft)
(usft)
Wellbore:
30-041-1
7.00
90.00
Design:
30-04L1_wp02
-4,443.09
2,699.57
Planned Survey
90.38
6,026,504.83
521,057.57
-4,355.39
2,774.34
7.00
90.75
Measured
521,145.09
TVD Below J
2,808.56
Depth
Inclination Azimuth
System V
+N/ -S
(usft)
(1) (1)
(usft)
(usft)
Start DLS 7.00 TFO 90.00
521,237.82
-4,165.89
11,500.00
93.08 50.97
6,528.53
4,431.99
11,600.00
93.01 57.98
6,523.20
4,489.98
11,700.00
92.90 64.99
6,518.04
4,537.63
11,750.00
92.83 68.49
6,515.54
4,557.35
Start DLS
7.00 TFO 90.00
-5,238.95
Start DLS 7.00 TFO 80.00
11,800.00
92.82 71.99
6,513.07
4,574.23
11,900.00
92.78 79.00
6,508.18
4,599.22
12,000.00
92.70 86.01
6,503.40
4,612.24
Planned TD at 12000.00
-5,069.03
Start DLS 7.00 TFO 82.00
Casing Points
ConocoPhillips
Planning Report Baker Hughes
Local Co-ordinate Reference:
Well 30-04
TVD Reference:
Mean Sea Level
MD Reference:
30-04: @ 59.00usft (30-04:)
North Reference:
True
Survey Calculation Method:
Minimum Curvature
Measured Vertical Casing
Depth Depth Diameter
(usft) (usft) Name (in)
12,000.00 6,503.40 2-3/8" 2.375
Hole
Diameter
(in)
3.000
Plan Annotations
Vertical
Dogleg
Toolface
Map
Map
+E/ -W
Section
Rate
Azimuth
Northing
Easting
(usft)
(usft)
(o/100usft)
(1)
(usft)
(usft)
-4,524.31
2,617.30
7.00
90.00
6,026,446.57
520,976.56
-4,443.09
2,699.57
7.00
90.38
6,026,504.83
521,057.57
-4,355.39
2,774.34
7.00
90.75
6,026,552.77
521,145.09
-4,309.52
2,808.56
7.00
91.11
6,026,572.65
521,190.89
-4,262.53
2,840.49
7.00
90.00
6,026,589.68
521,237.82
-4,165.89
2,897.03
7.00
90.17
6,026,615.01
521,334.36
-4,066.92
2,943.12
7.00
90.52
6,026,628.36
521,433.28
Measured Vertical Casing
Depth Depth Diameter
(usft) (usft) Name (in)
12,000.00 6,503.40 2-3/8" 2.375
Hole
Diameter
(in)
3.000
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
8,600.00
6,445.10
2,063.97
-4,748.46
TIP
8,675.00
6,499.93
2,076.12
-4,798.17
KOP
8,700.00
6,517.43
2,080.34
-4,815.50
Start Build 42.00
8,799.57
6,552.18
2,101.82
-4,903.89
Start DLS 42.00 TFO 90.00
8,869.57
6,552.18
2,134.71
-4,964.82
Start DLS 7.00 TFO 70.00
8,950.00
6,550.83
2,192.24
-5,020.95
Start DLS 7.00 TFO 90.00
9,050.00
6,547.48
2,270.80
-5,082.65
Start DLS 7.00 TFO 110.00
9,275.00
6,550.59
2,470.18
-5,185.32
Start DLS 7.00 TFO 118.00
9,500.00
6,578.48
2,687.17
-5,234.76
Start DLS 7.00 TFO 40.00
9,700.00
6,596.94
2,885.78
-5,238.95
Start DLS 7.00 TFO 80.00
9,950.00
6,589.88
3,129.41
-5,187.85
Start DLS 7.00 TFO -95.00
10,300.00
6,577.94
3,472.93
-5,137.93
Start DLS 7.00 TFO 95.00
10,700.00
6,581.24
3,862.91
-5,069.03
Start DLS 7.00 TFO 82.00
10,950.00
6,583.19
4,072.61
-4,934.73
Start DLS 7.00 TFO 55.00
11,200.00
6,558.05
4,236.81
-4,749.19
Start DLS 7.00 TFO -122.00
11,400.00
6,533.94
4,364.53
-4,597.84
Start DLS 7.00 TFO 90.00
11,750.00
6,515.54
4,557.35
-4,309.52
Start DLS 7.00 TFO 90.00
12,000.00
6,503.40
4,61224
-4,066.92
Planned TD at 12000.00
12/4/2019 3:14:02PM Page 5 COMPASS 5000.14 Build 85H
ConocoPhillips
ConocoPhillips Anticollision Report Baker Hughes
Company:
ConocoPhillips Alaska Inc_Kuparuk
Project:
Kuparuk River Unit -2
Reference Site:
Kuparuk 30 Pad
Site Error:
0.00 usft
Reference Well:
30-04
Well Error:
0.00 usft
Reference Wellbore
30-04L1
Reference Design:
30-04L1_wp02
Reference 30-04L1_wp02
Local Co-ordinate Reference
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Offset TVD Reference:
Filter type: GLOBAL FILTER APPLIED: All wellpaths within 200'+ 100/1000 of reference
Interpolation Method: MD Interval 25.00usft Error Model:
Depth Range: 8,600.00 to 12,000.00usft Scan Method:
Results Limited by: Maximum ellipse separation of 3,000.00 usft Error Surface:
Warning Levels Evaluated at: 2.79 Sigma Casing Method:
Survey Tool Program Data 12/4/2015
From To
(usft) (usft) Survey (Wellbore) Tool Name
100.00 8,600.00 30-04 (30-04) BOSS -GYRO
8,600.00 12,000.00 30-04L1_wp02 (30-041-1) MWD OWSG
Well 30-04
30-04: @ 59.00usft (30-04:)
30-04: @ 59.00usft (30-04:)
True
Minimum Curvature
2.00 sigma
EDT 14 Alaska Production
Offset Datum
ISCWSA
Tray. Cylinder North
Combined Pedal Curve
Added to Error Values
Description
Sperry -Sun BOSS gyro multishot
OWSG MWD - Standard
Summary
Reference
Offset
Distance
Measured
Measured
Between
Between
Separation Warning
Site Name
Depth
Depth
Centres
Ellipses
Factor
Offset Well - Wellbore - Design
(usftl
(usft)
(usft)
(usft)
Kuparuk 30 Pad
30-01 - 30-01A - 30-01A
Out of range
30-01 - 30-01AL2 - 30-01AL2
Out of range
30-02 - 30-02 - 30-02
10,550.00
9,350.00
735.63
618.58
6.285 CC
30-02 - 30-02 - 30-02
10,561.67
9,425.00
738.85
614.42
5.938 ES
30-02 - 30-02 - 30-02
10,569.08
9,550.00
760.94
629.09
5.771 SF
30-02 - 30-02A- 30-02A
10,550.00
9,350.00
735.63
618.47
6.279 CC
30-02 - 30-02A - 30-02A
10,561.67
9,425.00
738.85
614.31
5.933 ES
30-02 - 30-02A- 30-02A
10,569.08
9,550.00
760.94
628.98
5.767 SF
30-02 - 30-02ALl - 30-02ALl
10,550.00
9,350.00
735.63
618.47
6.279 CC
30-02 - 30-02ALl - 30-02AL1
10,561.67
9,425.00
738.85
614.31
5.933 ES
30-02 - 30-02ALl - 30-02ALl
10,569.08
9,550.00
760.94
628.98
5.767 SF
30-02 - 30-02ALl PB1 - 30-02ALl PB1
10,550.00
9,350.00
735.63
618.47
6.279 CC
30-02 - 30-02ALl PB1 - 30-02ALl PB1
10,561.67
9,425.00
738.85
614.31
5.933 ES
30-02 - 30-02AL1 PB1 - 30-02ALl PB1
10,569.08
9,550.00
760.94
628.98
5.767 SF
30-02 - 30-02AL2 - 30-02AL2
10,550.00
9,350.00
735.63
618.47
6.279 CC
30-02 - 30-02AL2 - 30-02AL2
10,561.67
9,425.00
738.85
614.31
5.933 ES
30-02 - 30-02AL2 - 30-02AL2
10,569.08
9,550.00
760.94
628.98
5.767 SF
30-02 - 30-02AL2-01 - 30-02AL2-01
10,550.00
9,350.00
735.63
618.47
6.279 CC
30-02 - 30-02AL2-01 - 30-02AL2-01
10,561.67
9,425.00
738.85
614.31
5.933 ES
30-02 - 30-02AL2-01 - 30-02AL2-01
10,569.08
9,550.00
760.94
628.98
5.767 SF
30-04 - 30-04 - 30-04
Out of range
30-04 - 30-04 - 30-04
8,625.00
8,625.00
0.00
-86.26
0.000 STOP Drilling, CC, SF
30-04 - 30-04 - 30-04
8,699.93
8,700.00
1.15
-87.07
0.013 STOP Drilling, ES
30-04 - 30-041-1-01 - 30-041-1-01_wp01
10,901.13
10,875.00
41.04
14.57
1.550 Caution Monitor Closely, SF
30-04 - 30-041-1-01 - 30-041-1-01_wp01
10,925.98
10,900.00
36.25
13.27
1.578 Caution Monitor Closely, ES
30-04 - 30-041-1-01 - 30-041-1-01_wp01
10,999.76
10,975.00
29.32
21.53
3.762 CC
30-04 - 30-041-1-02 - 30-04L1-02_wp02
Out of range
30-06 - 30-061-1-04 - 30-06L1-04
10,119.28
9,490.00
1,303.63
1,187.63
11.238 CC, ES, SF
30-10 - 30-10 - 30-10
Out of range
Kuparuk 3R Pad
3R-26 - 3R-26 - 3R-26
11,266.95
8,625.00
20.86
-112.02
0.157 STOP Drilling, CC
3R-26 - 3R-26 - 3R-26
11,280.37
8,600.00
28.60
-157.21
0.154 STOP Drilling, ES, SF
CC - Min centre to center distance or covergent point, SF - min separation factor, ES - min ellipse separation
12/4/2019 9 11:37AM Page 2 COMPASS 5000 14 Build 85H
3
2
d
Y
a
m
J
O QV
4
O o
O t0D
vi c� m
J
N� Q
w 02
Q d 0
Lu
m_
0
O ro~
m
J
w a
N Z
�
OIC M— -.;F co 9' of Z6'li � rnrno
LL O O O O O O O O O O O O O o
o�pm
f LL$g`§
7
m
H LL LL LL LL LL LL LL LL LL LL LL LL LL N
oOHH�H�HHHHHHH�.-
O
F.r000000000000000
U
O
J CO
N N 0 Cl 0 Cl 0 0 0 0 0 0 0 0 0
oz
gSoB
0)
m O m O O O O O O O O O O O O O O O O
�'
Em �'
M
a:)
CO �'�
J N
O Cn Cn(n(n(n(n(n(n(n Cn Cn Cn(n(n~
JJ J J J JJ JJ JJ J J J -p
m 0 0 !] D D D D 0 0 0 C
o LL'crrr'r��-t:f� cr car c
QM 0
��LLp�tomtamtammtamto�o�a;�o;,a;gm
0')
2 M.- Mao (O tDN
O2 CO c0 c0 o -i
O O m O m m� M t D 0 m M M O e t
M M M N M M M n m T a o M 1 J M m
N N N N N
�'r M MtpmOM�mMm01�� M �nm
o 0 e D L t 7 M� O t V l () T C D I 1` m v m 1 m C O
A $OO
>>O'
N Z
�
O to 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
o r o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
o
0 0 0 00 0 0 W O O 4") t N A N O O
O
J CO
n
ml�md'MrnmCO��mm
�
rl
•0
C ...
m O m O O O O O O O O O O O O O O O O
M
N
O N C:� 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
QM 0
O
M M C' ) m V N N
YY JC�
V
�'r M MtpmOM�mMm01�� M �nm
o 0 e D L t 7 M� O t V l () T C D I 1` m v m 1 m C O
A $OO
>>O'
V m� c:> mMMM tU C2 tDM V m0(D
(��(Omm00 NN Om �
O'
i Y Ni M N
O) co
v V V A i J !> 47 V d gIt Y
O
C u-)
y In`V'
N� V OCD
d.� d 0 I
Ln
tD
m MM�N00� 1� V mmtO tXJ IfJMN
V �'
J
W
c) t O 0 4 C 0 0 1 M m N N N t 2 J I N
m 2 N O 1+ M �-
2 N p
30.
¢
N
i!'J
O O O� c � t D CMD C epON M MtD
NNN NNNN N04 Ma's V
W
C,2 M a D m M C a D V <Y' m c Y O
m
J
�- m V M V�� m a D m N . O m L[ J -,I-
P
a
_j
J
M m 1 N N 0 (� O C O t O m l, M c6 M vi M
IyJ
mao r` oo `0 MSO
V M tD 7 �(J lo M In to
t0 tD tD tD coCSJ Cp Cp (O t0 tD CO (D tD t0 (O (O (O t0
L O
M
to l[')(OO M mm�
Z N
MMch MC')a0� o�t+1 OCD M Lo C')c0 tp
N
�
to coM COa-.-N V' N� N V Lo dr to CD
N N N N M M m M m M
CL
�0� OOmm MMS --r IZ MIS I�a-cO i-
MN 0000 tO mOMO w OOMNN
c t�-�r m m m p C D 1- m m m C O m O m m m
c D
0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0
S
LU 0
5 O Cl O LI: Li 0 0 0 0 O O Cl O O O O O O
® a
+
oino m of o ou-i0000000000
ol�omto u7 u�l�0 ou�oo�noo�no
O
o o
M t X> a O co C O C O m m m m m
OX00
FNM V Nt01�MmO rN My D f�M
-
Oz
Ll
Or
V
-
N
k
2
\
_
( /
r I T — — - —-
--
1�3
-C
0-
0 a
S
0
c
U
,,:.,.g ¥ .
} \\\
\uf�nm\ \ &\ In
§ q\ > > { }
KUP PROD WELLNAME 30-04 11 30-04
ConoeoPhillips
Alaska.irtc.
well AttrlDutes max Angle & MIJ i u
Fieltl Name Wellbore API/UWI Wellbore Status I cl (°) MD (RKB) Aot Btln (RKB)
K PAR KRIVER NIT 2 21 2 0 PR D 1.60 2,600.00 8,984.0
Comment H2S (ppm) Date Annotation End Date KB-Grd (R) Rig Release Data
SSSV:NIPPLE 140 9/25/2013 Last W0: 7/21/2013 40.00 7/9/1988
30-04,212 196:31;57 PM
Last Tag
Vertical schematic (actwi)
Annotation Depth (RKB) End Date Wellbore Last Mod By
Last Tag: RKB 8,696.0 9/26/2019 30-04 zembaej
HANGER. 31 1
Last Rev Reason
Annotation End Data Wellbore Last Mod By
Rev Reason: Updated Tag Depth 9/26/2019 30-04 zernbaej
Casing Strings
Casing Description OD (in) ID (in) Top MKS) Set Depth (ttKB) Set Depth (TVD)... WtlLen (L.. Grade Top Th road
CONDUCTOR 16 15.06 35.0 115.0 115.0 62.50 H-40 Welded
CONDUCTOR; 35.0-115.0
Casing Description OD (In) ID (In) Top (1110411) Set Depth (RKB) Set Depth (TVD)... WtlLen (I... Grade Top Thread
SURFACE 9 5/8 8.92 35.0 5,099.2 4,029.0 36.00 J-55 BTC
Casing Description OD (In) ID (In) Top (RKB) Set Depth (ttKB) Set Depth (TVD)... Wt/Len (I... Grade Top Thread
t
NIPPLE; 508.1
PRODUCTION 7 6.28 33.0 8,961.3 6,768.7 26.00 J-55 BTC
Casing Description OD (in) ID (in) Top (RKB) Set Depth (RKB) Set Depth (TVD)... Wt/Len (I Grade Top Thread
LINER 41/2 3.96 7,951.4 8,8%0 6,686.8 12.60 L-80 IBTM
Liner Details
GAS LIFT; 3,098.4
Nominal ID
Top(ftK13) Top(TVD)(RKB) Top Incl (°) Item Des Com (in)
7,951 4 6,037.9 45.08 PACKER 2RH ZXP w/HD LINER TOP PACKER 4.310
7,970.0 6,051.0 45.08 HANGER DG FLEX -LOCK LINER HANGER 4.400
GAS LIFT; 4,760.7
7,979.8 6,058.0 45.08 SBE BAKER SEAL BORE EXTENSION 4.000
Tubing Strings
Tubing Description String Ma... ID (In) Top (RKB) get Depth (R.. Set Depth (TVD) (... Wt (Ib/h) Grade Top Connection
TUBING WO 3 1/2 2.99 T. 7,987.9 6,063.7 9.30 L-80 EUE 8rd AB Mod
Completion Details
Top (TVD) Top Incl Nominal
SURFACE; 35.0-5,099.2
Top(ftKB) (RKB) (°) Item Des Com ID (In)
I
31.1 31.1 0.08 HANGER CIW GEN IV TUBING HANGER w/ Type'H' Profile 2.992
GAS LIFT; 6,117.1
508.1 508.1 0.38 NIPPLE CAMCO DS NIPPLE 3.5" x 2.875" 2.875
7,901.7 6,002.8 45.10 NIPPLE CAMCO 3.5" x 2.812" DS NIPPLE SN: T070815 2.812
7,950.4 6,037.2 45.08 LOCATOR BAKER GBH LOCATOR sub w/ 7 -ft Space out 2.992
7,959.1 6,043.3 45.08 SEAL ASSY i Baker 80-40 Seals 2.990
GAS LIFT; 7,166.4
Other In Hole (Wireline retrievable plugs, valves, pumps, fish, etc.)
Top (TVD) Top Incl
Top (RKB) (RKB) V)
Des Com
Run Date
ID (in)
8,694.0 6,572.4 42.89
Fish SLIP STOP CATCHER SUB FISH. 1/2 OF A SLIP, 2
10/24/201
0.000
GAS LIFT; 7,843.2
FULL SLIPS, SLIP RETAINER RING 8 2.70" X 30"
8
CATCHER.
Perforations & Slots
Shot
NIPPLE; 7,901.6
Dens
Top (TVD)
at. (TVD)
(sh.tslft
Top (MIKE)
Btm(ftKB)
(RKB)
(ttKB)
Linked Zone
Date
)
Type
Co'
8,622.0
8,640.0
6,519.7
6,532.9
C-4, C-1, UNIT
5/7/1989
12.0
CMT SQZ
2 1/8" EnerJet, 60 deg.
B, 30-04
phasing -- Squeezed behind
4-1/2" liner during 2013
RWO
LOCATOR, 7,950.4
8,653.0
8,669.0
6,542.4
6,554.1
A-3,30-04
5/7/1989
12.0
CMT SQZ
21/8" EnerJet, 60 deg.
phasing -- Squeezed behind
SEAL ASSY; 7,959.1
4-1/2" liner during 2013
RWO
8,675.0
8,695.0
6,558.5
6,573.1
A-1, 30-04
1/5/2015
6.0
APERF
2.5" 6SPF, 60 DEGREE
PHASING, DEEP
penetrating chgs
8,675.0
8,695.0
6,558.5
6,573.1
A-1,30-04
8/8/2016
6.0
APERF
2.5'"POWERJET OMEGA
Liner Cement; 7,950.0 We
CHARGES 6 SPF, 60 DEG
PHASING
8,675.0
8,698.0
6,558.5
6,575.3
A-2, 30-04
5/7/1989
12.0
CMT SQZ
2 1/8" EnerJet, 60 deg.
phasing -- Squeezed behind
4-1/2" liner during 2013
CMT SOZ; 8,622.0-8.640.0-
RWO
8,675.0
8,695.0
6,558.5
6,573.1
A-2, 30-04
7/18/2013
6.0
APERF
3-3/8" OD 6 SPF
MILLENNIUM 60 DEG
PHASING 25gr HMX
8,710.0
8,730.0
6,584.1
6,598.8
A-1, 30-04
9/25/1988
8.0
CMT SQZ
41/2" HSD Csg Gun, 45
deg. phasing - Squeezed
CMT SQZ; 8,653.0-8,669.0-
behind 4-1/2" liner during
2013 RWO
APERF; 8,675.0-8,6950
APERF; 8,6750$695.0
Cement Squeezes
Top (TVD) Btm (TvD)
APERF; 8,675.0-8,695.0
CMT SOZ; 8.675 0$698.0
lop (ttKB) Btm (RKB) (RKB) (RKB) Des
Start Date
Com
7,950.0 6,8bU.Ul IJ,UL515.91 6,686.8 LINER CMT I
7/15/2013
Mandrel Inserts
Fish, 8,694.0
St
an
on Top (TVD) Valve Latch Port Size TRO Run
N Top (RKB) (ttKB) Make Model OD (In) Se, Type Type (In) (psi) Run Date Co.
1 3,098.4 2,599.8 WTF KBMG GAS LIFT DMY BK 0.000 0.0 9/30/2018
CMT SOZ; 8,710.0-8.730.0-
2 4,760.7 3,787.1 WTF KBMG GAS LIFT DMY BK 0.000 0.0 9/30/2018
�El
3 6,117.1 4,747.2 WTF KBMG GAS LIFT DMY BK 0.000 0.0 10/1/2018
4 7,166.4 5,485.2 WTF KBMG 1 GAS LIFT DMY BK 0.000 0.0 5/14/2019
5 7,843.2 5,961.6 WTF KBMG 1 1 GAS LIFT DMY BK 0.000 0.0 11/18/2014
Notes: General & Safety
End Date Annotation
7/10/1994 NOTE: WAIVERED WELL: IA x OA COMMUNICATION
9/8/2003 NOTE: 31" Surf CSG Patch covering hole located 32" below OA valve. PT @ 1,500 psi - good 2013 RWO
5/18/2009 NOTE: View Schematic w! Alaska Scherr ic9.0
10/2/2015 NOTE: Placed total of 8.1 -bbl SANDLOCK-V and 1509# sand behind pipe
10/2/2015 NOTE: Pumped SANDLOCK-V resin frac with 8 -PPA Jordan Unimin sand, 8.9 -BPM, 5000 -psi.
LINER; 7,951 4-8,850.0
1/27/2016 NOTE: MILLED RESIN TO 8,730 CTMD = COMPLETE
10/31/2018 Note: Unable to locate mandrels @ 7166 8 7832' RKB
PRODUCTION; 33.0-8,961.3
0
§
\
2
v
\
a
C?
0
m
0-
/§
§
k \ c i c000
n
9a?
f \ °p0
$ f
§
E � ) �
Ea
c co ca%
f f w
Et = coS §
o�
\ / L
% k $ A 7C ( 9_\§
J e
CL w E DCU
f � )/ w K j CL co 2 ° 2
$ § §�~ . .
EA § § -j / §
3 _ai o L)
& ) § 2 § $ �&
/ 5 m§mCD
co
0 CD
3
g -
0 OL
2�
a D. 2
� k§ U n
�co
� 2 2�2 �2
[ fE.zob k -
2f ¥) 2 E§§[ 2&
Gt gg �...
§nI
422E
U
(9
E
s
co
0
U
d
y
O
Q
O
a
O
0
M
Qo 0
3oN
cl
O O�' C -j
r-
r
ANN co
O V J
o6 Q O
(D C
E
E U
O
I� O.
7 co U
(/> W n-11 U7 ,
O C7 V N d
O c a, O E 30�
O 7 V n a, N Lo o
In N _n l:l V '�1
C C Oc'J(0
U Y C r c5 co
n wcax
E 55
— m n o Q N ODO
Wr N O cc) o cn +
o
oaCo
oD
•'��'>
00 0 c�e�
J `^
E i# E E a0w m v1
c0 cl) c0 m X m
U ai U U N aa))U
N N 04 CV N LL N N
@ C7 m
M M M r c7 co D c0 Q'
r.r:r.f.r.r.r.r.:.: .: .: .: .:.: •:•r•r,`� � r•r•r•r•r•r.r•J•J•J.r•r•r•r•J•J•r•.
7M 71�1
co
1.1.1KK•L••.••.••.•1.1••.••.•1i��. L,1 ;1 ;1 ,1 ,L ,L ,L ;L ,1;� L•1•L•L•1•L•L
i•r•J.r•r•J•r•.
- - , L ti.L 1.L.L•L.1
i r•i•r•r•r•r•.
L.1.L.L.L.L.ti.L
J•r•J•r•r•r•r•.
�•1.1.1•L.L•1•L
LrL:Lf1�1rLf1�1�
r•: •:•rY•Jti�;`.
ti•1•L•1.1.t.
r•: •:•r•r.J�ry.
•. 1:�.%�.:�.:1,��,�'.:t:5.:y��.�L:ti:1.1.L•L•L•1.1•L•L•LK•L•1•L•L 1.1.1.1•Y
: •1.: •r.r •Ir.MI:.: •rI.I:.: •: •: •r.J•r•r•r•J•r•r•r•J•r•r•t•r•r•r•: •: •:•:•J•r.r..
0 �II�III I��III
(D L o� 222 c
m
C -
42
04
O NO
# U oo n oo ao 00 ' 0
M(P d. �(h in0 cD�
(Nps a00 O` N((O(noh (V co
Lo Lo d Qco oo co r- co
O @ W
Boyer, David L (CED)
From: Germann, Shane < Sha ne.Germann@conocophiIli ps.com>
Sent: Thursday, December 12, 2019 9:14 AM
To: Boyer, David L (CED)
Cc: Loepp, Victoria T (CED)
Subject: RE: [EXTERNAL]X, Y Surface Location for Three KRU 30-04 Laterals from 3)-04
Motherbore
Dave,
Thanks for catching this and letting me know. It does appear the x,y surface location on the BakerHughes documents
are accurate. I must have made a mistake while converting the coordinates. Doing the coordinate conversions again,
the surface location from box 4a (legal description) matches the x,y surface location from BakerHughes and what you
have listed below. I'm sorry for the confusion this caused.
Shane Germann
Coiled Tubing Drilling Engineer
ConocoPhillips Alaska
Office: 907-263-4597
Cell: 406-670-1939
700 G St, ATO 664, Anchorage, AK 99501
From: Boyer, David L (CED) <david.boyer2@alaska.gov>
Sent: Thursday, December 12, 2019 8:55 AM
To: Germann, Shane <Shane.Germann@conocophillips.com>
Cc: Loepp, Victoria T (CED) <victoria.loepp@alaska.gov>
Subject: [EXTERNAL]X, Y Surface Location for Three KRU 30-04 Laterals from 3)-04 Motherbore
Hi Shane,
In reviewing the PTD applications for the three 30-04 laterals, I encountered a large difference in the x, y surface
location reported on the PTD vs. the x, y calculated by Baker Hughes for the same wellhead. KRU 30-04 motherbore
(1988) was already in the AOGCC database including the Albers -150 Northing and Easting coordinates. The legal
government section description was consistent since 1988, but only the Baker x, y surface calculation matched previous
records in the RBDMS and GeoGraphix databases.
We are using the Baker surface x, y for all three laterals. For example, on the x axis alone, the discrepancy was 4500'.
made the corrections on the PTD but wanted to advise you of this anomaly. Perhaps it was a cut and paste error from
another well?
We are using: x=525515.58 & Y=6022030.55 from the survey file.
Best,
Dave Boyer
AOGCC
Transform Points
Source coordinate system
i State Plane 1927 - Aaska Zone 4
Datum:
NAD 1927 - North America Datum of 1927 (Mean)
5993905.621 476227.35
1 022030.55 525`15.58
2
Target coordinate system
Albers Equal Area (-150)
Datum:
NAD 1927 - North America Datum of 1927 (Mean)
Easting Nortt
1 7931.4 2276521.7
Da t<,2l- H U
x J -fid � 3a -oar- �e�l heud ,
rap
Type values rsto the skeet or copy paste mns ofdatafrom a spreadsheet usin—gthe keyboard sho 1. rt I cut - s . C I t I d+C I to I
,6opy and Ctd+Vto paste. Then dick on the appropriate arrow button to transform the points to the desired coordinate system.
< Back Finish L Cancel Help
Transform points
Source coordinate system
State Plane 1927 - Alaska Zane 4
Datum:
NAD 1927 - North America Datum of 1927 (Mean)
Target coordinate system
Albers Equal Area (-150)
Datum:
NAD 1927 - North America Datum of 1927 (Mean)
Eastfng I Northing
1 6541.1 12257569.5
2
Cc-)PU-E-
Ooe"�>
M w- C' ti 6 O G4af a b a,5
cyC�
ype values into the spreadsheet or copy and paste columns of data from a spreadsheet using the keyboard shortcuts Ctr1+C to
opy and Ctrl+V'to paste. Then click on the appropriate arrow button to transform the points to the desired coordinate system.
XI
_
i < Back Finish Cancel Help�
TRANSMITTAL LETTER CHECKLIST
WELL NAAIE:
,D
.o
V Development _ Service ! Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: _(� u 1� Q 1/'U 1` I Ve k 00L: t t t,l, V
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
LATERAL
The permit is for a new wellbore segment of existing well Permit
No. I — 062, API No.
V/ (If last two digits
50-D
Production should continue to be reported fun �� O�
e original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
Pilot Hole
acquired for the pilot hole must be clearly differentiated in both well
name ( PH) and API number (50- -
- _) from records, data and logs acquired for well
namD on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Spacing Exception
Approval to produce/inject is contingent upon issuance of a conservation
order approving
a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
Dry Ditch Sample
All dry ditch sample sets submitted to the AOGCC must be in no greater
than 30' sample intervals from below the
permafrost or from where
samples are first caught and 10' sam le intervals through target zones.
Please note the following special condition of this permit:
Non -Conventional
production or production testing of coal bed methane is not allowed for
(name of well) until after (Compan Name) has designed
Well
and
implemented a water well testing program to provide baseline data on
water quality and quantity, (Comnanv Name must contact the AOGCC
-7r
to obtain advance approval of such water well testing.program.
Regulation
20 AAC 25.071(a) authorizes the AOGCC to specify types of
V/
well logs to be run. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 da s after cetion, susperasion or abandonment of this well.
Revised 2/2015
WELL PERMIT CHECKLIST Field & Pool KUPARUK RIVER, KUPARUK RIV OIL - 490100 - Well Name: KUPARUK RIV UNIT 30-041-1 Program DEV_ -_Well bore seg 0
PTD#: 2191840 Company ConocoPhillips AI_aska, Inc. _ Initial Class/Type DEV/PEND GeoArea 890 Unit 11160 On/Off Shore On Annular Disposal ❑
Administration 1 Permit fee attached NA
Geologic Engineering Public
Commissioner: Date: Commissioner: Date Co missio Date
12
Lease number appropriate_
Yes
3
Unique well name and number
Yes
4
Well located in -a defined pool-
Yes
5
Well located proper distance from drilling unit boundary_
Yes
�6
Well located proper distance from other wells
Yes
7
Sufficient acreage available in drilling unit
Yes
8
If deviated, is wellbore plat included
Yes
Directional_ plan view & wellbore profile included. - -
9
Operator only affected party
Yes
10
Operator has appropriate_ bond in force
Yes
11
Permit can be issued without conservation order
Yes
Appr Date
12
Permit can be issued without administrative approval
Yes
13
Can permit be approved before 15-day_wait
Yes
DLB 12/10/2019
14
Well located within area and strata authorized by Injection Order # (put_ 10# in comments) (For
NA
15
All wells within 1/4 -mile area of review identified (For service_w_ell only)
NA_
16
Pre -produced injector: duration of pre -production Less than 3 months (For service well only)
NA_
17
Nonconven. gas conforms to AS31.05.030(j.1.A),(j.2.A-D)
NA
18
Conductor string_ provided
NA
Conductor set for_KRU 30-04
Engineering
19
Surface casing protects all known_ USDWs
NA_
Surface casing set for KRU 30-04
20
CMT vol adequate to circulate on conductor & surf csg
NA
Surface casing set and fully cemented
21
CMT vol adequate to tie-in long string to surf csg -
NA
22
CMT will cover all known productive horizons- - -
No
Productive interval will be completed with uncemented production liner
23
Casing designs adequate for C,_T, B &_ permafrost _ - - - -
Yes
24
Adequate tankage -or reserve pit -
Yes
Rig has steel tanks; all waste to approved disposal wells
25
If a_re-drill, has a_ 10-403 for abandonment been approved
NA
26
Adequate wellbore separation proposed
Yes
Anti -collision analysis complete; no major risk failures
27
If diverter required, does it _meet_ regulations
NA_ - -
Appr Date
I28
Drilling fluid program schematic_&_ equip list adequate
Yes
Max formation pressure is 4244 psig(13.1 ppg EMW), will drill w/ 8.6 ppg EMW an-dmaintain overbal w/ MPD
VTL 12/13/2019
29
BOPEs,_do they meet regulation
Yes
30
BOPE_press rating appropriate; test to (put psig in comments)
Yes
MPSP is 3588 psig; will test BOPs_to 4000-psig
31
Choke manifold complies w/API_ RP -53 (May 84)
Yes
32
Work will occur without operation shutdown
Yes
33
Is presence of 1-12S gas_ probable
Yes
1-12S measures required
34
Mechanical_ condition of wells within AOR verified (For service well only)
NA
35
Permit can be issued w/o hydrogen_ sulfide measures
No
30 -Pad wells are H2S-bearing. 1-12_S_ measures are required.
Geology
36
Data presented on potential overpressure zones
Yes
Managed pressure drilling with CTD unit.
Appr Date
37
Seismic analysis_ of shallow gas zones_
NA
DLB 12/10/2019
38
Seabed condition survey (if off -shore)
NA
31 9
-Contact name/phone for weekly progress reports [exploratory only] _ _
NA
Geologic Engineering Public