Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
182-020
STATE OF ALASKA A/AKA OIL AND GAS CONSERVATION COASION REPORT OF SUNDRY WELL OPERATIONS 1.Operations Abandon ❑ Plug Perforations❑ Fracture Stimulate❑ Pull Tubing ❑ Operations shutdown El Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill ❑ 3rforate New Pool ❑ Repair Well El Re-enter Susp Well ❑ Other: Failed to install patch CI 2.Operator 4.Well Class Before Work: 5.Permit to Drill Number: Name: Hilcorp Alaska,LLC Development❑ Exploratory❑ 182-020 • 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic El Service El 6.API Number: • Anchorage,AK 99503 50-733-20147-01-00 7.Property Designation(Lease Number): 8.Well Name and Number: RECEIVED ADL0018729 • Trading Bay Unit/D-06RD a 9.Logs(List logs and submit electronic and printed data per 20AAC25.071): 10.Field/Pool(s): • ND 0 9 2015 N/A McArthur River Field/Middle Kenai G Oil Pool 11.Present Well Condition Summary: AOGCC Total Depth measured 13,838 • feet Plugs measured 13,335&13,730 feet true vertical 10,298 • feet Junk measured N/A feet Effective Depth measured 13,335 feet Packer measured 12,465,13,110,13,291 feet true vertical 9,811 feet true vertical 9,011,9,597,9,769 feet Casing Length Size MD ND Burst Collapse Structural Conductor Surface 2,477' 13-3/8" 2,477' 2,282' 3,090 psi 1,540 psi Intermediate 6,652' 9-5/8" 6,652' 4,831' 5,750 psi 3,090 psi Production 13,833' 7" 13,833' 10,291' 8,160 psi 7,020 psi Liner Perforation depth Measured depth 12,639-13,690 feet C c ,,a . True Vertical depth 9,166-10,152 feet Tubing(size,grade,measured and true vertical depth) 3-1/2" 9.2#/L-80 12,539&13,367 9,077&9,842 Baker SAB 12,465(MD)9,011 (ND) Packers and SSSV(type,measured and true vertical depth) Baker FB-2 13,110(MD)9,597(ND) Baker FB-1 13,291 (MD)9,769(ND) SSSV 323(MD)323(ND) 12.Stimulation or cement squeeze summary: Intervals treated(measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 2617 550 3060 Subsequent to operation: 0 0 0 0 0 14.Attachments(required per 20 AAC 25.070,25.071,&25.283) 15.Well Class after work: • Daily Report of Well Operations CI Exploratory❑ Development ❑ Service 0 Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16.Well Status after work: • Oil ❑ Gas ❑ WDSPL❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR 0 WINJ CI WAG ❑ GINJ❑ SUSP 0 SPLUG❑ 17.I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O.Exempt: 315-566 Contact Stan Golis Email sgolisahilcorp.com Printed Name Stan Golis Title Operations Manager Signature � Phone (907)777-8356 Date 11/6/2015 tS /z• 3• s RBDMS nv 13 2015 Form 10-404 Revised 5/2015 / Z/3�:- Submit Original Only • • Dolly Varden Platform Well: D-06RD , II SCHEMATIC Completed: 04/08/2000 PTD: 182-020 API: 50-733-20147-01 Hilcorp Alaska,LLC RKB to TBG Head=39.0' CASING DETAIL 1 J SIZE WT GRADE CONN ID TOP(MD) BTM(MD) TOP(TVD) BTM(TVD) Holes in 2 tubing _y 13-3/8" 61J-55 Butt 12.515 44.80 2,477.29 45 2,282 1,900'- 43 4,206 1,950 9-5/8" 40 N-80 Butt 8.835 42.80 5,645.02 3 ) 9-5/8" 43.5 N-80 Butt 8.755 5,645.02 6,652(TOW) 4,093 4,831 7" 29 N-80 Butt 6.184 41.45 13,833.03 41 10,291 7"Baker Model J Stage Collar at 7592.14',Stage 11250 sx,Stage II 600 sx TUBING DETAIL sw ) 3-1/2" 9.2 L-80 Imp.Butt SCC 2.992 39.70 12,539 40 9,077 3-1/2" 9.2 L-80 Imp.Butt SCC 2.992 13,111 13,367 9,598 9,842 JEWELRY DETAIL I) NO. Depth(MD) Depth(TVD) ID Item 1 39 39 2.950 3-1/2"8rd DCB Cameron Tbg hgrw/H BPV Profile 2 323 323 2.813 OTIS SSSV 3 2,304 2,162 2.867 3-1/2"SMO-1 GLM w/dummy valve and BK-2 latch Window 5652-5711 4,501 3,505 2.867 dummy L 6,465 4,713 2.867 dummy 7,864 5,601 2.867 dummy ) DVT @ 8,886 6,310 2.867 dummy I I 7592' 9,634 6,853 2.867 dummy P 10,254 7,298 2.867 dummy 10,900 7,760 2.867 dummy 11,488 8,200 2.867 dummy 12,062 8,666 2.867 dummy 12,424 8,975 2.867 dummy 1111 4 12,465 9,011 Baker SAB perm packer&K-22 anchor/seal assy. 5 12,506 9,047 2.813 3-1/2"X nipple,2.813"ID _MN 6 12,539 9,077 3-1/2"tbg tail,WLEG 4 7 13,110 9,597 Baker FB-2 top isolation packer x 5 8 13,291 9,769 Baker F-1 perm bottom isolation pkr(no MOE) 6 9 13,335 9,811 2.813 3-1/2"X nipple,2.813"ID,w/"PX"plug in place&10'of CaCO3 on plug 10 13,367 9,842 3-1/2"tbg tail,WLEG -- G2-4 PERFORATION DATA Zone TOP(MD) BTM(MD) TOP(TVD) BTM(TVD) Amount SPF Comments 7 G-2 12,639 12,657 9,166 9,182 18 Open >C G-3 12,712 12,735 9,231 9,252 23 Open Rig CO to l. ......._>1><, ::. �� g G-4 12,787 12,812 9,299 9,322 25 Open 13702' - HB-1 13,148 13,169 9,633 9,653 21 Isolated dpm on x 9 = HB-2 13,212 13,230 Isolated 4/5/00 10 _ 9,694 9,711 18 HB-2 13,255 13,280 9,735 9,758 25 Isolated H8-3 13,300 13,320 9,778 9,797 20 Isolated L , HB-4 13,400 13,450 9,873 9,921 50 Isolated TD=13833'MD PBTD=13730' HB-4 13,470 13,490 9,940 9,959 20 Isolated Hole Angle=14°@ PBTD Max Hole Angle=55°@ 2900'MD HB-4 13,518 13,550 9,986 10,017 32 Isolated KOP=800' 1-1B-5 13,565 13,595 10,032 10,061 30 Isolated HB-5 13,655 13,690 10,119 10,152 35 Isolated Revised by: JLL 11/05/15 • Hilcorp Alaska, LLC Well Operations Summary Well Name API Number Well Permit Number Start Date End Date D-06RD 50-733-20147-01 182-020 9/19/15 10/12/15 Daily Operations: 09/19/15-Saturday MOBE TO LOCATION. WIRELINE SAFETY MEETING WITH PRODUCTION. RIG UP W/L- PRESSURE TEST LUB TO 3300 PSI HIGH - 250 PSI LOW. RIH WI 3" GS W/AD-2 STOP TO 1,967' KB, WT SET STOP, POOH. RIH WI 3" GS W/ DD PACK OFF WI 10' PATCH PIPE 12'11" LOA-TO 1,967' KB, SET- POOH. RIH WI 3" GS W/ DD PACK OFF WI STINGER BOTTOM TO 1,954' KB, SET DOWN WT-SET- POOH. RIH WI 3" GS W/A STOP TO 1,941' KB WT SET STOP- POOH. STANDBY FOR PRODUCTION TO PRESSURE TEST PATCH. FAILED PRESSURE TEST. RIH WI 3" GS TO 1,941' KB, PULL A STOP. RIH W/3" GS TO 1,940' KB, PULL PATCH. RIH WI 3" GS TO 1,954' KB, PULL PATCH. RIH W/3" GS TO 1,967' KB, PULL AD-2 STOP. RIG DOWN W/L. 10/10/15-Saturday RIG UP W/L PT LUB 3,000 PSI - GOOD. RIH WI 2.9" BRAIDED LINE BRUSH TO 2,000' KB. MAKE SEVERAL PASSES- POOH. RIH W/2.5"JDC W/3 1/2 DD HOLE FINDER TO 2,000', SET. INJECT WITH WATER FLOOD TO DETERMINE IF TUBING AND CASING ARE COMMUNICATING - FAIL. PULL UP TO 1,990' FAIL. 1,980' KB - FAIL. 1,970' FAIL. 1,960' FAIL. 1,955' NO COMMUNICATION, HOWEVER TUBING PRESSURE STILL BLEEDS OFF. 1,950 PSI -SAME. 1,945' PASS- 1500 PSI - BLED TO 1100 PSI. STABILIZED FOR 30 MINUTES, POOH. RIH WI 3" GS WI AD-2 STOP TO 1,968' KB WT, SET STOP- POOH. RIH WI 3" GS WI PATCH PIPE (13' LOA)TO 1,968' KB, SET- POOH. RIH W/3" GS WI PATCH WI STINGER BOTTOM TO 1,954' KB, SET- POOH. RIH W/3" GS WI A-STOP TO 1,943' KB, SET STOP- POOH. LAY DOWN LUB-SECURE WELL. 10/11/15-Sunday ATTEND MORNING -JSA- PERMITS. BEGIN FILLING BACKSIDE TO TEST TUBING PATCH INTEGRITY. BACKSIDE STILL ON VACUUM. PUT WATERFLOOD ON TUBING. CASING PRESSURE FOLLOWS TUBING PRESSURE. RIH WI DD HOLE FINDER TO 1,943' KB (TOP OF PATCH) SET, TEST. PRESSURE UP TO 1500 PSI. RIH WI SAME SET AT 500'. HOLD 1000 PSI SOLID. POOH SLOWLY BLEEDS OFF. POOH. INSPECT TOOL-GOOD. RIH WI SAME TO 1,900' KB SET. HOLD 1000 PSI. PASS. POOH. RIH WI SAME TO 1,940' KB SET, FAIL. 1,938' KB SET, FAIL. 1,935' KB SET, FAIL. 1,930' KB SET, FAIL. 1,925' KB SET, FAIL. 1,920' KB SET, FAIL. 1,915' KB SET, FAIL. 1,910' KB SET, FAIL. 1,905' KB SET, FAIL. 1,900' KB SET, FAIL. 1,895' KB SET, FAIL. POOH. INSPECT TOOL. GOOD. RIH W/SAME TO 1,910' KB SET, FAIL. 1,900' KB SET, FAIL. 1,890' KB SET, FAIL. 1,880' KB PRESSURE UP TO 1000 PSI. SLOWLY BLEEDS OFF. POOH. DISCUSS WI CO. REP. DECIDE TO SET PATCH ON TOP OF PATCH IN HOLE. RIH WI 3" GS TO 1,942' KB WT, PULL A-STOP. RIH WI 3" GS WI PATCH (12'10" LOA)TO 1,942' KB, SET PATCH POOH. RIH W/3" GS W/ PATCH 12'8" LOA)TO 1,929' KB WT, SET PATCH POOH. RIH W/3" GS W/A-STOP TO 1,917' KB WT, SET STOP POOH. INJECT DOWN TUBING WITH WATER FLOOD.TUBING AND CASING BOTH PRESSURE UP. RIG DOWN W/L SECURE WELL FOR NIGHT. 10/12/15-Monday ATTEND MORNING SAFETY MEETING - PERMITS-JSA. RIG UP W/L. RIH W/3" GS TO 1,917' KB WT, PULL A-STOP. RIH W/ 3" GS TO 1,919' KB WT, PULL PATCH PIECE. RIH WI 3" GS TO 1,930' KB WT, PULL PATCH PIECE. RIH W/3" GS TO 1,942' KB WT, PULL PATCH PIECE. RIH WI 3" GS TO 1,955' KB WT, PULL PATCH PIECE. RIH W/3" GS TO 1,968' KB WT, PULL AD-2 STOP. RIG DOWN W/L. 1 • �\\ • • to OF 71i, 1%% , THE STATE� ., ' °f. � LAsKA. (..„- Alaska and Gas Conservation Commission u � -- __ 333 West Seventh Avenue xT, Ii GOVERNOR BILL WALKER Anchorage, Alaska 99501-3572 pF- *° Q, Main: 907.279.1433 ALAS Fax 907.276.7542 www.aogcc.alaska.gov Dan Marlowe lifKl 3E I k Operations Engineer SCA Hilcorp Alaska, LLC 1 a - 0.2.0 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Re: McArthur River Field, Middle Kenai G Oil Pool, TBU D-06RD Sundry Number: 315-566 Dear Mr. Marlowe: Enclosed is the approved application for sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, , / A2. te....i.,,,,A......_ Cathy '. Foerster Chair DATED this fel-lay of September, 2015 Encl. . . • • RECEIVED SEP 14 STATE OF ALASKA P^ 1113-11k,S ALASKA OIL AND GAS CONSERVATION COMMISSION gOGCC APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 1.Type of Request: Abandon❑ Plug Perforations❑ Fracture Stimulate ❑ Pull Tubing ❑ Operations shutdown ❑ Suspend❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change Approved Program ❑ Plug for Redrill❑ Perforate New Pool ❑ Repair Well 111 Re-enter Susp Well ❑ Other: Install Patch CI 2.Operator Name: 4.Current Well Class: 5.Permit to Drill Number: Hilcorp Alaska,LLC Exploratory ❑ Development ❑ 182-020 • 3.Address: 3800 Centerpoint Drive,Suite 1400 Stratigraphic E] Service 6.API Number: Anchorage,AK 99503 50-733-20147-01 • 7.If perforating: 8.Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No 0 J Trading Bay Unit/D-06RD • 9. Property Designation(Lease Number): 10. Field/Pool(s): ADL0018729 McArthur River Field/Middle Kenai G Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD(ft): Total Depth TVD(ft): Effective Depth MD(ft): Effective Depth TVD(ft): Plugs(measured): Junk(measured): •13,838 '10,298 - 13,335 , 9,811 13,335&13,730 N/A Casing Length Size MD ND Burst Collapse Structural Conductor Surface 2,477' 13-3/8" 2,477' 2,252' 3,090 psi 1,540 psi Intermediate 6,652' 9-5/8" 6,652' 4,831' 5,750 psi 3,090 psi Production 13,833' 7" 13,833' 9,341' 8,160 psi 7,020 psi Liner Perforation Depth MD(ft): Perforation Depth TVD(ft): Tubing Size: Tubing Grade: Tubing MD(ft): 12,639-13,690 , 9,166-10,152 3-1/2" 9.2#/L-80 12,539&13,367 Packers and SSSV Type: Packers and SSSV MD(ft)and TVD(ft): Baker SAB,Baker FB-2, Baker FB-1 &SSSV , 12,465'(MD)9,011'(TVD)13,110'(MD)9,597'(ND)13,291'(MD)9,769'(ND)&323'(MD)323'(ND) 12.Attachments: Description Summary of Proposal l 13.Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic❑ velopment❑ Service CI ' 14.Estimated Date for 15.Well Status after proposed work: Commencing Operations: 9/28/2015 OIL El WINJ WDSP❑ Suspended El 16.Verbal Approval: Date: GAS ❑ WAG ❑ GSTO❑ SPLUG ❑ Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Dan Marlowe Email dmarlowe@hilcorp.com Printed Name _ Dan Marlowe Title Operations Engineer Signat�rr2/ /( "Iyu6-' /f' Phone (907)283-1329 Date 9/14/2015 l� COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test yr Location Clearance ❑ Other: k,j/+'tt.eS5e Al IT-I A /` ,,-,-tiS) ,' -& fel c S Spacing Exception Required? Yes ❑ No I Subsequent Form Required: /0 --110'1 APPROVED BY q Approved by: COMMISSIONER THE COMMISSION Date: 7/` —7 S 'l431115-12P ef./ -7,s ORIGINAL i4,- „,--- B®M,,, SET 21 /015 Submit Form and Form 10-403 Revised 5/2015 Approved application is valid for 12 months from the date of approval. Attachments in Duplicate • • Well Work Prognosis Well: D-06rd Hilcorp Alaska,LLC Date: 09/14/15 Well Name: Trading Bay Unit D-06rd API Number: 50-733-20147-01 Current Status: Injection Well Leg: Leg#B-1 (SE corner) Estimated Start Date: 09/28/15 Rig: N/A Reg.Approval Req'd? 403 Date Reg.Approval Rec'vd: Regulatory Contact: Juanita Lovett Permit to Drill Number: 182-020 First Call Engineer: Dan Marlowe Office: 907-283-1329 Cell:907-398-9904 Second Call Engineer: Ted Kramer Office: 907-777-8420 Cell:985-867-0665 Current Bottom Hole Pressure: -3,900 psi @ 9,053'TVD 0.43 psi/ft at mid perf Maximum Expected BHP: -3,900 psi @ 9,053'TVD 0.43 psi/ft at mid perf(well is shut-in) Max.Allowable Surface Pressure: -3,300 psi water flood pressure Brief Well Summary The D-06RD was initially completed in 1982 as a gas lifted producer. In 2012 it was converted to injection by running dummy valves in the mandrels.Currently the well has Tubing by IA communication from what appears to be a leak between 500-1000'.This procedure will pinpoint the leak and install a patch. Procedure: 1. MIRU Slick-line, PT lubricator to 3,300 psi Hi 250 Low. 2. RIH with slick-line and install tubing patch at+/- 730'-760'. 3. Pressure Test IA to 2500 psi 4. RD slick-line jot 3�� w - /rtCT- IA Attachments: 1. Current Well Schematic 2. Proposed Well Schematic • •111 Dolly Varden Platform SCHEMATIC Well: D-06RD Completed: 4/8/00 Hilcorp Alaska,LLC RKB to TBG Head=39.0' 1 2 CASING AND TUBING DETAIL _SIZE WT GRADE CONN TOP BOTTOM 3 ilIMID 13-3/8" 61 0 2477' 9-5/8" 40-47 0 6652' 7" 29 N-80 Butt 0 13833' 7"DV tool at 7592' N Tubing 3-1/2" 9.2 L-80 Imp.Butt 0 12539' 3-1/2" 9.2 L-80 Imp.Butt 13111' 13367' JEWELRY DETAIL NO. Depth Item 1 39' 3-1/2"8rd DCB Cameron Tbg hgr w/H BPV 2 323' SSSV 3 2304' 3-1/2"SMO-1 GLM w/dummy valve and BK-2 latch 4501' dummy L ' 6465' dummy 7864' dummy D 8886' dummy DVT @ 9634' dummy 17592' 10254' dummy 10900' dummy 11488' dummy 12062' dummy 12424' dummy 4 12465' Baker SAB perm packer&K-22 anchor/seal assy. 5 12506' 3-1/2"X nipple,2.813"ID D 6 12539' 3-1/2"tbg tail,WLEG MIE IN 7 13110' Baker FB-2 top isolation packer 4 8 13291' Baker F-1 perm bottom isolation pkr(no MOE) 9 13335' 3-1/2"X nipple,2.813"ID, x 5 w/"PX"plug in place&10'of CaCO3 on plug 6 10 13367' 3-1/2"tbg tail,WLEG G2-4 PERFORATION DATA TOP BTM ZONE COMMENTS 12639 12657 G-2 Open I 7 x 12712 12735 G-3 Open 12787 12812 G-4 Open Rig CO to — ►� 8 13702' — 13148 13169 HB-1 Isolated dpm on x -><9 — 13212 13230 HB-2 Isolated 4/5/0010 — 13255 13280 HB-2 Isolated 13300 13320 HB-3 Isolated L 13400 13450 HB-4 Isolated TD=13833'MD PBTD=13730' 13470 13490 HB-4 Isolated Hole Angle=14°@ PBTD 13518 13550 HB-4 Isolated Max Hole Angle=55°@ 2900'MD KOP=800' 13565 13595 HB-5 Isolated 13655 13690 HB-5 Isolated(Btm perf=10152'TVD) Revised by: ILL on 8/28/15 Dolly Varden Platform , v . • • II PROPOSED Well: D-06RD Completed: 4/8/00 Ilik•orp Alaska,LLC. RKB to TBG Head=39.0' 1 w Tubinf I I 1 2 1 CASING AND TUBING DETAIL Patch ±730' J _SIZE WT GRADE CONN TOP BOTTOM ±760' 3 , 13-3/8" 61 0 2477' 9-5/8" 40-47 0 6652' 7" 29 N-80 Butt 0 13833' 7"DV tool at 7592' Tubing 3-1/2" 9.2 L-80 Imp.Butt 0 12539' 3-1/2" 9.2 L-80 Imp.Butt 13111' 13367' r • JEWELRY DETAIL NO. Depth Item 1 39' 3-1/2"8rd DCB Cameron Tbg hgr w/H BPV 2 323' SSSV 3 2304' 3-1/2"SMO-1 GLM w/dummy valve and BK-2 latch 4501' dummy 6465' dummy 7864' dummy 8886' dummy DVT @ 9634' dummy 1 1 7592' 10254' dummy 10900' dummy 11488' dummy _ 12062' dummy 12424' dummy 4 12465' Baker SAB perm packer&K-22 anchor/seal assy. 5 12506' 3-1/2"X nipple,2.813"ID 6 12539' 3-1/2"tbg tail,WLEG 7 13110' Baker FB-2 top isolation packer 4 8 13291' Baker F-1 perm bottom isolation pkr(no MOE) 9 13335' 3-1/2"X nipple,2.813"ID, x 5 w/"PX"plug in place&10'of CaCO3 on plug 6 10 13367' 3-1/2"tbg tail,WLEG = G2-4 PERFORATION DATA TOP BTM ZONE COMMENTS 12639 12657 G-2 Open :::2i47 12712 12735 G-3 Open 12787 12812 G-4 Open Rig CO to ->< 8 13702' — 13148 13169 HB-1 Isolated dpm on x 9 — 13212 13230 HB-2 Isolated 4/5/00 10 = 13255 13280 HB-2 Isolated 13300 13320 HB-3 Isolated L 13400 13450 HB-4 Isolated TD=13833'MD PBTD=13730' 13470 13490 HB-4 Isolated Hole Angle=14°@ PBTD 13518 13550 HB-4 Isolated Max Hole Angle=55°@ 2900'MD KOP=800' 13565 13595 HB-5 Isolated 13655 13690 HB-5 Isolated(Btm perf=10152'TVD) Revised by: JLL on 8/28/15 • • Wallace, Chris D (DOA) From: Larry Greenstein <Igreenstein@hilcorp.com> Sent: Tuesday, September 08, 2015 7:31 AM To: Wallace, Chris D (DOA); Regg,James B (DOA) Cc: John Lee; Stan Golis; Dan Marlowe Subject: D-06RD pressure anomaly (PTD#1820200) Attachments: D-06rd Schematic 2015-08-28.doc; D-06RD 90 day TIO.xlsx Good morning, Chris and Jim This is to notify you that we have a potential tbg x IA communication issue with the Dolly Varden D-6RD well. The well was shut-in yesterday morning and we are requesting some diagnostic wireline and pressure testing to confirm and/or repair the communication. If the repair work is successful, AOGCC notification will be provided for a witnessed MIT after bringing the well back on to stable injection. As a converted producer,this well has multiple dummy valves installed in the GLMs and it is believed one of them has been dislodged after doing some recent spinner survey work. The spinner tool got hung up near the top GLM and may have unseated this dummy valve. There wasn't any indication of communication issues with this well prior to the wireline work. Attached is a schematic and a 90 day TIO plot for the well. Larry `�pr�E'� MAI 0 2 2Q16 • • O O O O O O O O O O O O O t!l O tll O O O e/ M N N —.-a .--. t l O lA ti O N li ..,-) al O to ' /) O N c a C oLa, Ira0 ...K.... o to ' C71 In 0 o o C) Ct N.0 o 0 0 0 0 ra �. rn c n 11 NIC:)''' I N ^e t) O I k .(..# 5 4 to .r O c) O co co co co O O O O O O O O co l/7 co tl1 O til M N N .-I .•. Imagel""oject Well History File Cover P(' ; XHVZE This page identifies those items that were not scanned during the initial production scanning phase. They are available in the original file, may be scanned during a special rescan activity or are viewable by direct inspection of the file. ~ ~ (~,-O_ ~) Well History File Identifier RESt' *" DIGITAL DATA OVERSIZED (Scannable) Color items: [] Diskettes, No. [] Maps: [] Grayscale items: [] Poor Quality Originals: [] Other: NOTES: [] Other, No/Type [] Other items scannable by large scanner OVERSIZED (Non-Scannable) [] Logs of various kinds [] Other BY: BEVERLY ROBIN VINCENT ~ARIA WINDY Project proofing BY: ~ ROBIN VINCENT SHERYL MARIA WINDY Scanning Preparation ~'/ x 30 = . ~~ BY: BEVERL~INCENT SHERYL MARIA WINDY Production Scanning Stage I PAGE COUNT FROM SCANNED F~LE: PAGE COUNT MATCHES NUMBER IN SCANNING PREPARATION: BY: Stage 2 IF NO ~N STAGE 1, PAGE(S) DISCREPANCIES WERE FOUND: ~ YES NO NO BY: BEVERLY ROBIN VINCE~ MARIA WINDY (SCANNING IS COMPLETE AT THIS POINT UNLESS SPECIAL ATTENTION IS REQUIRED ON AN INDIVIDUAL PAGE BASIS DUE TO QUALI'rY, GRAYSCALE OR COLOR IMAGES ) RESCANNEDBY~ BEVERLY ROBIN VINCENT .SHERYL MARIA WINDY General Notes or Comments about this file: DATE: Is~ Quality Checked 12/10/02Rev3NOTScanned.wpd STATE OF ALASKA • RECEIVED O SKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS Jukf 6 2012 1. Operations Abandon ❑ Repair Well ❑ Plug Perforations ❑ Perforate 'r{ C . .Convert t® mrntssKn1 Performed: Alter Casing ❑ Pull Tubing❑ Stimulate - Frac ❑ Waiver ❑ Time Extension❑ f.:..:i10ragL Change Approved Program ❑ Operat. Shutdown Stimulate - Other ❑ Re -enter Suspended WeII❑ 2. Operator Hilcorp Alaska, LLC 4. Well Class Before Work: 5. Permit to Drill Number: Name: Development ❑ Exploratory ❑ 182 -020 • 3. Address: 3800 Centerpoint Drive, STE 100 Stratigraphic ❑ Service 0 6. API Number: Anchorage, AK 99503 50- 733 - 20147 -01 7. Property Designation (Lease Number): 8. Well Name and Number: Trading Bay Unit ADL 0018729 ' Dolly Varden D -06RD • 9. Logs (List Togs and submit electronic and printed data per 20AAC25.071): 10. Field /Pool(s): ... McArthur River Field / Middle Kenai G Oil Pool ' 11. Present Well Condition Summary: Total Depth measured 13,838 • feet Plugs measured 13,335 & 13,730 feet true vertical 10,296 ■ feet Junk measured None feet Effective Depth measured 13,702 feet Packer measured 12,465; 13,110; 13,291 feet true vertical 10,164 feet true vertical 9,011; 9,597; 9,769 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 2,477' 13 -3/8" 2,477' 2,252' 3,090 psi 1,540 psi Intermediate 6,652' 9 -5/8" 6,652' 4,831' 5,750 psi 3,090 psi Production 13,833' 7" 13,833' 9,341' 8,160 psi 7,020 psi Liner Liner Perforation depth Measured depth 12,639- 12,657; 12,712- 12,735; 12,787- 12,812 feet True Vertical depth 9,166- 9,182; 9,231- 9,252; 9,299 -9,322 feet 3 -1/2" 9.2# / L -80 12,539' (MD) 9,077' (TVD) Tubing (size, grade, measured and true vertical depth) 3 -1/2" 9.2# / L -80 13,367' (MD) 9,842' (TVD) Baker SAB Packer / Baker FB-1 Packer / Baker FB-1 Packer 12,465' (MD) 9,011' (TVD); 13,110' (MD) 9,597' (TVD); 13,291' (MD) 9,769' (TVD) Packers and SSSV (type, measured and true vertical depth) SSV 323' (MD 323" (TVD) 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A 4 Treatment descriptions including volumes used and final pressure: i f'tNNE J UL 2 4 2 01 N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas -Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 19 0 Subsequent to operation: 0 0 4016 . 550 2200 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ❑ Development❑ Service 9 Stratigraphic ❑ Daily Report of Well Operations 16. Well Status after work: , Oil ❑ Gas ❑ WDSPL❑ GSTOR ❑ WINJ 0 ' WAG ❑ GINJ ❑ 3USP❑ SPLUG❑ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: Contact Ted E. Kramer ,fie:/ ° V>rF Printed Name Ted E. Kramer Title Operations Engineer 7 1/) L Signature ...<„,:f4....0. '- Phone 907- 777 -8420 Date 6/26/2012 q RQDMS JUL 12 IN V v r '04 ,sz 7,4/ Form 10 -404 Revised 11/2011 Submit Original Only A • • Dolls Varden Platform UNOCAL 76 Well D -6RD Completed 4/8/01) RKB to TBG Head = 39' CASING AND TUBING DETAIL .SIZE WT GRADE CONN TOP BOTTOM 1 f, 13 -3/8" 61 0 2477' 9 -5/8" 40-47 0 6652' 2 7" 29 N -80 Butt 0 13833' 7" DV tool at 7592' Z. Tubing 3 -1/2" 9.2 L -80 Imp. Butt 0 12539' 3 3 -1/2" 9.2 L -80 Imp. Butt 13111' 1336T JEWELRY DETAIL NO. Depth Item 1 39' 3 -1/2" 8rd DCB Cameron Tbg hgr w/H BPV 2 323' SSSV 3 2304' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 4501' 3 -1 /2" SMO -1 GLM w/ R -I valve and BK -2 latch L 6465' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 7864' 3 -1 /2" SMO -1 GLM w/ R -1 valve and BK -2 latch 8886' 3 -1 /2" SMO -1 GLM w/ R -1 valve and BK -2 latch 1 1 DVT (r� 9634' 3 -1 /2" SMO -1 GLM w/ R -1 valve and BK -2 Latch 7592' 10254' 3 -1/2" SMO -1 GLM w! R -1 valve and BK -2 latch 10900' 3 -1 /2" SMO -1 GLM w/ R -1 valve and BK -2 latch 11488' 3 -1/2" SMO -1 GLM w R -1 valve and BK -2 latch 12062' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 12424' 3 -1/2" SMO -1 GLM with orifice and BK -2 latch 4 12465' Baker SAB perm packer & K -22 anchor /seal assy. 5 12506' 3 -1/2" X nipple, 2.813" ID 6 12539' 3 -1/2" tbg tail. WLLG 4 7 13110' Baker FB -2 top isolation packer ) 8 13291' Baker F - perm bottom isolation pkr (no MOE) 5 9 13335' 3 -1 /2" X nipple, 2.813" ID, w / "PX" plug in place & 10' of CaCO3 on plug 6 10 13367' 3 -112" tbg tail, WLFG - G2 - PERFORATION DATA — TOP BTM ZONE COMMENTS 12639 12657 G -2 Open . 12712 12735 G -3 Open , 7..r. --- 7 12787 12812 G -4 Open ■ IN - - 13148 13169 HB -1 Isolated Rig CO to `-IIttttti► 8 13212 13230 HB -2 Isolated 13702' X tif 9 — 13255 13280 HB -2 Isolated dpm on 10 _ 4/5'00 _ 13300 13320 HB -3 Isolated 13400 13450 HB-4 Isolated ,11 17 11'�ii»> 1»11 13470 13490 HB-4 Isolated 111 ,■ TD = 13833' NID, PBTD = 13730' 13518 13550 HB-4 Isolated 13565 13595 HB -5 Isolated Hole Angle = 14 °at PBTD 13655 13690 FIB-5 Isolated (Btm perf= 10152' TVD) Max Hole Angle = 55° 2900' MD KOP = 800' D6RDActualSchem0202 REVISED: 2/20/02 DRAWN BY: JHM • • • STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submit to: jim.reaq(alaska.gov: doa. aoacc.orudhoe.bavettalaska.gov; phoebe.brooks(6talaska.cov OPERATOR: Hilcorp Alaska, LLC FIELD / UNIT / PAD: McArthur River/Trading Bay /Dolly Varden Platform DATE: 06/14/12 OPERATOR REP: Mike Rogde AOGCC REP: Lou Grimaldi Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well D -06RD Type Inj. W TVD 9,011' Tubing 2,400 2,375 2,375 2,375 Interval P.T.D._ 1820200 Type test P Test psi 2253 Casing 500 2,940 2,920 2,915 P/F P Notes: Good solid test OA 305 480 470 470 Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA Well Type Inj. TVD Tubing Interval P.T.D. Type test Test psi Casing P/F Notes: OA TYPE INJ Codes TYPE TEST Codes INTERVAL Codes D = Drilling Waste M = Annulus Monitoring I = Initial Test G = Gas P = Standard Pressure Test 4 = Four Year Cycle I = Industrial Wastewater R = Internal Radioactive Tracer Survey V = Required by Variance N = Not Injecting A = Temperature Anomaly Survey 0 = Other (describe in notes) W = Water D = Differential Temperature Test Form 10-426 (Revised 02/2012) MIT_Dolly_06 -14 -12 HILCORP WELL SERVICE REPORT Date: _ 5/1/2012 Well Number: D -6RD Work being done: PULL GLV Location: DOLLY Supervisor: MIKE LOOMIS AFE# / Charge Code: TK001802 Wireline Unit Number: SL -4 Pollard Wireline Crew: MARK,TREVOR,GREG Tree Connection Size /Type 4.5 INT. Total Wireline Miles: 8 Tree condition GOOD Wire Test: 19 -20 Fluid Level if Identified 30 Max Depth (KB): _ 6,465 Zero Wireline at: KB Well KB: 39 Minimum Tubing ID: 2.81 Max Tool OD: 2.75 Start Tbg. & Csg. PSI 50 -50 Ending Tbg & Csg PSI 50 -50 Time Operation Details W/L valve 1 tested 11:00 MEET AT PWL SHOP GET TOOLS FOR JOB 11:30 ARRIVE AT OSK FLY TO DOLLY PLATFORM 12:15 OBTAIN PERMIT HAVE PRE JOB SAFETY MEETING 12:45 RIG UP ON D -6 13:00 RIH WITH DANIELS KOT 1 3/8 DANIELS PULLING TOOL TO 6465KB NO LATCH POOH 14:30 RIH WITH BRUSH TO 6465KB WORK POOH 15:30 RIH WITH DANIELS KOT 1 3/8 DANIELS PULLING TOOL TO 6465KB NO LATCH POOH 17:30 RIH WITH OK KOT 1 3/8 DANIELS PULLING TOOL LATCH UP JARS DON'T GO OFF 18:00 Rig off well, secure for the night 19:00 Rebuild OJ and KOT DANIELS KOT $352.00 DANIELS 1 3 \8 PULLING TOOL $188.00 BRAIDED LINE BRUSH $68.00 OK -1 KOT $352.00 3 MAN CREW 12 HOUR MIN $3240.00 Work String Detail: 1.75 RS, Stem, KJ, OJ, LSSJ Sys and Length 6" 10' 8" 3' 7' Description of any None tools or debris left in the hole: Brief Summary of Try to pull GLV #3 Total Work Completed 'Total Hours Worked! 12 1 Total Tool Cost' $960.00 1 Total Hour Cost' $3,240.00 1 Ticket # : P-4114 Day # : Daily Cost: $4,200.00 Cumulative Cost: 1 Well Downtime Hr. Shut in H2S PPM Approved by: Michael Loomis Code:) TK001802 HILCORP • WELL SERVICE REPORT Date: 5/2/2012 Well Number: D-6RD Work being done: Change Dummy Valve Location: Dolly _ Supervisor: Mike Loomis AFE# / Charge Code: TK001802 _ Wireline Unit Number: SL -9 Pollard Wireline Crew: Mark, Trevor, Greg Tree Connection Size/Type 4.5 INT Total Wireline Miles: 12 Tree condition Good Wire Test: NA Fluid Level if Identified Surface Max Depth (KB): 12,501 Zero Wireline at: RKB Well KB: 39' Minimum Tubing ID: 2.81 Max Tool OD: 2.7 Start Tbg. & Csg. PSI 50/50 Ending Tbg & Csg PSI 50/50 Time Operation Details W/L valve 1 tested 6:00 Morning Meeting, JSA, TGSM, Permit 6:30 Stand Lubricator 6:45 RIH w /OK1 KOT & 1 3/8 DANIELS TOOL 6464KB w/t LATCH JAR HIT SLIP OFF POOH NO VALVE 8:10 RIH w /OK1 KOT & 1 3/8 DANIELS TOOL 6464KB w/t NO LATCH POOH 9:30 RIH w /OK1 KOT & 1 3/8 JD TOOL 6464KB w/t NO LATCH POOH 10:45 RIH w /DANIELS KOT 1 3/8 DANIELS TOOL 6464KB NO LATCH POOH 12:15 RIH w /DANIELS KOT 1 3/8 JD TOOL 6464KB w/t NO LATCH POOH 13:50 RIH w /OK1 KOT 1.30 LIB TO 6464KB POOH EXAMINE, NO VALVE MARKS 15:00 RIH w/2.75 LIB 12501KB POOH EXAMINE LIB PRONG MARK 17:45 RIH w /OK1 KOT RK1 & VALVE TO 6464KB WORK NO SET POOH WITH VALVE 19:15 RIH w /OK1 KOT RK1 WITH PINS TO 6464KB WORK POOH NOT SHEARED 20:45 RIG DOWN FOR NIGHT CAP WELL Labor: 3 man crew and unit $3240.00 3 add hours $705.00 Tools: OK1 KOT 2nd day $296.00 1 3/8 Daniels pulling tool 2nd day $68.00 Daniels KOT 2nd day $296.00 1 3/8 JD pulling tool 2nd day $68.00 LIB $94.00 Work String Detail: 1.75 RS, Stem, KJ, OJ, LSSJ Size and Length 6" 10' 8" 3' 7' Description of any NONE tools or debris left in the hole: Brief Summary of Total Work Completed dotal Hours Worked' 15 1 Total Tool Cost' $622.00 1 Total Hour Cost' $3,945.00 Ticket # : P -4115 Day # : 2 Daily Cost: $4,567.00 Cumulative Cost: Well Downtime Hr. Shut in H2S PPM Approved by: Michael Loomis Code:) TK001802 HILCORP • WELL SERVICE REPORT Date: 5/3/2012 Well Number: D -6RD Work being done: CHANGE VALVE Location: DOLLY Supervisor: Mike Loomis AFE# / Charge Code: TK001802 Wireline Unit Number: SL -9 Pollard Wireline Crew: MARK,TREVOR,GREG Tree Connection Size/Type _ 4.5 INT Total Wireline Miles: 8 Tree condition GOOD Wire Test: _ NA Fluid Level if Identified surface _ Max Depth (KB): 12,505 Zero Wireline at: KB Well KB: 39 Minimum Tubing ID: 2.81 Max Tool OD: 2.99 Start Tbg. & Csg. PSI 50/50 Ending Tbg & Csg PSI 160/300 Time Operation Details W/L valve 1 Tested 6:00 Morning meeting, JSA, TGSM, Permit 6:45 Cut wire, repack stuffing box 7:30 RIH w /OK1 KOT and 1.25 LIB, locate and hit down 2 times, pooh, LIB shows no valve in pocket 9:00 RIH w/2.99 Braidedline Brush to # 3 mandrel @ 6464 KB, w/t pooh 10:00 Stand by for tools from the beach 11:30 RIH w /ok5 KOT and 1.30 brush to # 3 mandrel work pooh 13:00 RIH w /OK5 KOT & RK1 set valve pooh. 14:15 stand by for tubing P/T 1200psi good 15:15 stand by for IA P/T 2200psi good 16:00 RIH w/2.5 JDC to 12501 KB, w/t to latch prong, pooh with prong 17:20 RIH w/2.5 GS to 12505 KB POOH w /PLUG 2.5 JDC $128.00 2.5 GS $187.00 OK1 KOT day 2 $296.00 LIB day 2 $68.00 Braided line brush $68.00 OK5 KOT $352.00 3 Man crew 12 hour min $3240.00 3 ADD HOUR $705.00 Work String Detail: 1.75 RS, STEM XO 1.50 OJ LSSJ Sys and Length 6" 10' 6" 3' 7' Description of any NONE tools or debris left in the hole: Brief Summary of set dummy valve #3 Total Work Completed (Total Hours Worked 16 1 Total Tool Cosh $1,099.00 1 Total Hour Cost' $4,045.00 1 Ticket # : P-4116 Day # : 3 Daily Cost: $5,144.00 Cumulative Cost: Well Downtime Hr. Shut in H2S PPM Approved by: Michael Loomis Code:I TK001802 • • MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Ji Regg r--7 DATE: Tuesday, June 26, 2012 P.I. Supervisor 1 `e'? qz ,/112 SUBJECT: Mechanical Integrity Tests HILCORP ALASKA, LLC D -06RD FROM: Lou Grimaldi TRADING BAY UNIT D -06RD Petroleum Inspector Src: Inspector Reviewed By: P.I. Supry 0 NON - CONFIDENTIAL Comm Well Name TRADING BAY UNIT D - 06RD API Well Number 50 733 - 20147 - 01 - 00 Inspector Name: Lou Grimaldi Permit Number: 182 - 020 - Inspection Date: 6/14/2012 Insp Num: mitLG120614233555 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min Well i D -06RD • Type Inj W ' TVD 9011 • IA 500 2940 - 2920 2915 • PTD 1820200 - Type Test SPT Test psi 2253 OA 310 480 470 470 _ 1 Interval INITAL - P/F P ' Tubing 2375 2375 2375 2375 - Notes: This is initial test on producer after extended long term shut -in. Replaced dummy valve in tubing SPM to repair leak. Well pressured up with water flood in reasonable amount of time. Good solid test. Freshly calibrated test gages onboard for test. .D J U L 2 S Zti Tuesday, June 26, 2012 Page 1 of 1 • • Ferguson, Victoria L (DOA) From: Ferguson, Victoria L (DOA) Sent: Thursday, May 10, 2012 2:29 PM To: 'Tom Fouts - (C)' Cc: Ted Kramer; Larry Greenstein; Juanita Lovett; Schwartz, Guy L (DOA) Subject: RE: D -6RD 10 -403 Submittal Cancelation Tom, As you requested the 10 -403 submittal for D -6RD (API 50- 733 - 20147 -01), Sundry Number 312 -163 has been cancelled. Thank you, Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave, Ste 100 Anchorage, AK 99501 Work: (907)793 -1247 suANNED MAY 1 8 2. victoria.ferquson(a alaska.gov From: Tom Fouts - (C) f mailto:tfouts @hilcorp.coml Sent: Thursday, May 10, 2012 8:24 AM To: Schwartz, Guy L (DOA); Ferguson, Victoria L (DOA) Cc: Ted Kramer; Larry Greenstein; Juanita Lovett Subject: D -6RD 10 -403 Submittal Cancelation Guy & Victoria, We are requesting the cancelation of the 10 -403 submittal for D -6RD (API 50- 733 - 20147 -01) which was delivered to your office on April 24` 2012. Please feel free to contact me with any questions you may have. Thank you, Tom Fouts Construction Manager Hilcorp Alaska, LLC tfouts @hilcorp.com Direct: (907) 777 -8398 Mobile: (907) 351 -5749 • • • RECEIVED STATE OF ALASKA APR 2 4 2012 ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS AOGC C 20 AAC 25.280 1. Type of Request: Abandon ❑ Plug for Redrill ❑ Perforate New Pod ❑ Repair Well ❑ Change Approved Program ❑ Suspend ❑ Plug Perforations ❑ Perforate ❑ Pull Tubing O • Time Extension ❑ Operations Shutdowi ❑ Re -enter Susp. Well ❑ Stimulate ❑ Atter Casing ❑ Other. Convert to Injector/Replace Tubing El ' 2. Operator Name: 4. Current Well Class: 5. Permit to DriH Number: Hilcorp Alaska, LLC Development ❑ Exploratory ❑ 182-020 . , 3. Address: Stratigraphic ❑ Service ❑ 6. API I�tfmber: 3800 Centerpoint Drive, STE 100, Anchorage, AK 9503 50X33- 20147 -01 . 7. If perforating, closest approach in pool(s) openedly this operation to nearest 8. Well Name and Number.. property line where ownership or landownership ranges: Spacing Exception Required? Yes ❑ No O DdlyVarden D -6RD 9. Property Designation (Lease Number): 10. Field /Pool(s): Trading Bay Unit ADL 0018729 McArthur River /Middle Kenai G Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total De tlyvlD ( : Total Depth TVD (ft): Effective Depth MD (ft): Effective Depth TVD ( • lugs (� red): Junk (measured): 1 ; 338 i'`r (i- 10,298 13,702 10,191 13,3i5'/plug & 13,730' - 13,833' cement None Casing Length Size MD / TVD ` Burst Collapse / Structural 2 Conductor Surface 2,477' 13 -3/8" 2,477' 2' 3,090 psi 1,540 psi Intermediate 6,652' 9 -5/8" 6,652' ,831' 5,750 psi 3,090 psi Production 13,833' 7" 13,833' 9,341' 8,160 psi 7,020 psi Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: � ` .. ng Grade: Tubing MD (ft): 12,639- 12,657 9,166 -9,182 3 -1/2" 3 •.2 #/ L -80 12,539' 12,712- 12,735 9,231 -9,252 3 -1/2" r� 1 9.2 #/ L -80 13,367' 12,787- 12,812 9,299 -9,322 Packers and SSSV Type: P k s and •SSV MD (ft) and TVD (ft): Baker SAB Packer /Baker FB -2 Packer /Baker FB -1 Packer /SSSV 12,4 MD)/ 13 ,110'(MD)/13,291'(MD)/323'(MD) & 9,011'( D)/ 9, 597'(TVD)/9,769'(TVD)/323'(TVD) 12. Attachments: Description Summary of Propos' lc. W= !Class after proposed work: Detailed Operations Program ❑ BOP Sketch / Exploratory ❑ Development ❑ Service O • 14. Estimated Date for ° 15. Well Status after proposed work: 1 Commencing Operations: 5/6/2012 Oil ❑ Gas ❑ WDSPL ❑ Suspended ❑ 16. Verbal Approval: Date: N/A WINJ O • GINJ ❑ WAG ❑ Abandoned ❑ Commission Representative: N/A GSTOR ❑ SPLUG ❑ 17. I hereby certify that the foregoing is true and correct to a best of my knowledge. Contact Ted Kramer Printed Name Ted E. Kramer Title Sr. Operations Engineer Signature �� , P one (907) 777 -8420 Date 4/23/2012 COMMISSION USE ONLY Conditions of approval: Notify Commission sot t a representative may witness Sundry Number' . 3 ' � ��� _____,.) Plug Integrity ❑ BOP Test `E Mechanical Integrity Test U Location Clearance ❑ Other: 9 0 /J 1 t" ,3 2 /c) /) t ✓ - 7 7 1 p l G /y / a-5 R.-z d !_' h-_, 11-/„,7. `1a hr�- -, 0 55V re Subsequent Form Required: l� --- g Lj APPROVED BY Approved by: COMMISSIONER THE COMMISSION Date: ,,., i ) !' 3 /' .z BDN1s MAY 11 x0°12 �� Form 10 -403 Revised 1/2010 1 1 { J 1 \! \✓ 111��� 1{ V 11 l VV L. ubmit in Du lica tle4 v °., r zt /a • • Hilcorp Alaska, LLC D -6RD Conversion to Water Injection McArthur River Field WO Procedure April 22, 2012 WELL: D -6RD OBJECTIVE: To convert from gas lift to a water injection well utilizing the CUDD Hydraulic Work Over Unit. • Work Scope: Cut and pull the existing tubing, Run Injection Packer and tubing tieback on a 4 -1/2" injection tubing completion. BACKGROUND: The Dolly Varden D -6RD is a gas lifted development well that was to be converted in 2001 to . water injection. The gas lift valves were pulled and dummy valves were installed in the pockets. However, the well would not pass an MIT test after the mandrels were dummied off. Attempts were made to determnine where the tubing was leaking by running a plug but the plug would not hold and the source of the leak was not determined. CURRENT STATUS: I,,,o/ L4-C73 0(4/.4% ch 4 'd 1 c1 <o CU C / we ir: ef , '� /t'Ctq The D -6RD well is currently shut in. co mi fieferi ey t o ��,�,�rr tie Doglegs: j 2- 7' r�" ' �Cc'h4,' 6 ai y ", w6' '"/ 11 t J C � _ Depth (ft.) DLS �'"Q r ', 2,600 4.08 lo " , h eCky ,kvi , ,✓"-t' if' MASP for this well is 780 p 170 The e j 00 I PROCEDURE: 1. MIRU CUDD Hydraulic Workover Unit. 2. Ensure that H2S detection equipment is functional. 3. Shut off & disconnect gas lift supply, bleed off casing and tubing pressure. 4. Rig up chicksan or high pressure hose to 9 -5/8" casing valve and tubing. 5. Bull head 150 Bbls. Of injection water down the tubing. 6. Ensure well is dead. Disconnect well from production system per LO/TO procedures. Shut the well in. Note shut in pressures. Uonu 1 of C • • 14 Hilcorp Alaska, LLC D -6RD Conversion to Water Injection McArthur River Field WO Procedure April 22, 2012 7. R/U pumping line to the X -Mas tree, fill up tubing, observe well and confirm there is no pressure on the well head. 8. Set a BPV in tubing. 9. ND tree and seal flange. Verify that any ports in the tubing hanger have been properly plugged to prevent leakage during BOP testing. 10. Nipple up BOP stack and test. (Note: Notify AOGCC 48 hours in advance of the BOP test.) 30 psi - Cut and Pull Existing Tubing: 1. M/U 4 -1/2" EUE (pin) landing string (have TIW valve attached). 2. Monitor well to insure well is dead. 3. MIRU E -line unit. 4. Test Lubricator. 5. MU and run in hole with GR working up to 2.0" to 12,506' (Baker X nipple 2.813 "). POH. 6. MU and run in the hole with radial torch to 12,444' and verify cutter is on depth with tubing tally. And Cut 3 -1/2" tubing string. POH with Cutter. 7. POH and UD 3 -1/2" tubing while maintaining hole fill with FIW. (Note: Check tubing for NORM contamination as pulling out of the well). 8. Continue to monitor well pressures while maintaining FIW fillage to keep well drinking and on a vacuum Run Injection Packer and Injection Tubing String 9. PU scoop head over shot, hydraulic set injection packer on 4 -1/2" injection tubing string. 10. RIH with same and position scoop head over the 3 -1/2" tubing stub at 12,444'. 11. Set Hydraulic injection packer. ( 3o ,H..1 ti/Z Seit) P s,, . //A 12. Space out and land injection tubing in the tubing hanger with appropriate tension. 13. ND BOP stack and NU Injection head. SE% 137' ✓lTW G y - V 7 14. Turn well over to production. pone 7 of I • • • II Hilcora Alaska, LLC D -6RD Conversion to Water Injection McArthur River Field WO Procedure April 22, 2012 Current Schematic: RKB to TBG Head = 39' CASING AND TUBING DETAIL SIZE WT GRADE CONN TOP BOTTOM 1 13 -3/8" 61 J -55 0 2477' 9 -5/8" 40 -47 N -80 0 6652' 7" 29 N -80 Butt 0 13833' 2 7 "DV tool at 7592' L Tubing 3 -1/2" 9.2 L -80 Imp. Butt 0 12539' 3 3 -1/2" 9.2 L -80 Imp. Butt 13111' 13367' JEWELRY DETAIL N O. Depth Item U 1 39' 3 - 1/2" 8rd DCB Cameron Tbg h gr w/H BPV 2 323' SSSV 1 3 2304' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 4501' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch L 6465' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 7864' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch - 8886' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 9634' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 1 1 DVT @ 10254' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch - 7592' 10900' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 11488' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch 12062' 3 -1/2" SMO -1 GLM w/ R -1 valve and BK -2 latch - 12424' 3 -1/2" SMO -1 GLM with orifice and BK -2 latch 4 12465' Baker SAB perm packer & K -22 anchor /seal assy. - 5 12506' 3 -1/2" X nipple, 2.813" ID m e , 1b i r 6 12539' 3 - 1/2" tbg tail, WLEG Alm G 7 13110' Baker FB -2 top isolation packer 4 8 13291' Baker F -1 perm bottom isolation pkr (no MOE) 9 13335' 3 -1/2" X nipple, 2.813" ID, x w / "PX" plug in place & 10' of CaCO3 on plug 5 10 13367' 3 -1/2" tbg tail, WLEG 6 PERFORATION DATA G 2 - 4 TOP BTM ZONE COMMENTS 12639 12657 G -2 Open 12712 12735 G -3 Open 7 12787 12812 G -4 Open 7 (_ 13148 13169 HB -1 Isolated Rig CO to f 8 13212 13230 HB -2 Isolated 13702' X L` ,, 9 — dpm on �t 13255 13280 HB -2 Isolated 10 — 4/5/00 — 13300 13320 HB -3 Isolated 13400 13450 HB -4 Isolated 11111■1111 13470 13490 HB -4 Isolated , _1' 1 ''» 1 13518 13550 HB -4 Isolated 13 565 13 595 HB -5 Isolated Hole Angle =14 °at PBTD 13655 13690 HB -5 Isolated (Btm perf = 10152' TVD) Max Hole Angle = 55° @ 2900' MD KOP = 800' • • • Hilcora Alaska, LLC D -6RD Conversion to Water Injection McArthur River Field WO Procedure April 22, 2012 Proposed Schematic Dolly Varden Platform UNOCAL i WWellD -6RD Proposed 4112012 RKB to TBG Head =39' CASING AND TLBING DETAIL SIZE WT GRADE CONN TOP BOTTOM 13 -3 S" 61 0 247" 9 -5 3" 40-47 0 6652' 29 N -S0 Butt 0 13833' DV tool at , 59 2 ' - Inbing 3 -1 9.2 L -SO :mp. Butt 0 12539' 3-1 "2" 9.2 L -S0 :mp. Butt 131 :1' 13367' JEWELRY DETAIL NO. Depth Item 39' 4-1 2 Srd DCB Cameron Thg hgrw H BPV 323' SSSV 3 12400' 4 -1 2" X 7" Hydraulic set Packer. 3a 12404' 4 -1 2" X 3 -1 L" Scoop head L. ' pemparJ►a. $.K -22 auchal.eal a Y. 5 12506' 3 -1 2" X Molt 2.313" ID 6 12539' 3 -1 '2" tbg tatY, WWLEG mi - E DVT 7592' 7 13110' , _, Baber -2 top o.1ation.pacls'r 8 13291' Baker F -1 perm bottom isolation pkr (no MOE) 9 13335' 3 -1 2" X nipple. 2.813 - ID, 10 13367' 3 -1 thg tail. \\LEG s PERFORATION DATA TOP BIM ZONE CONDIENTS pm- 4 12639 1265. G - 2 Open 12712 12735 0-3 Open 12787 12812 G - Open 13148 13169 HB -1 Isolated 13212 13230 HB -2 Isolated 02 13255 13280 HB -2 Isolated 13300 13320 HB -3 Isolated 13400 13450 HB -4 Isolated 13470 13490 HB -4 Isolated • ■ 13518 13550 HB -4 Isolated 13565 13595 HB-5 Isolated Rig CO to °'- -�'°m� S 13655 13690 HB -: I s olated (Attp pad= 10152 13702' x y+ 9 — dRbEI on l a 4j00 TD = 13S33' MD. PBTD = 13'30' Hole .Anele =14'at PBTD Max Hole Anele °R: 2900' \D KOP = S00' Arta A ..f • • Hilcorp Alaska, LAX D -6RD Conversion to Water Injection McArthur River Field WO Procedure April 22, 2012 Contact Information Company Contact Equipment/Service Provided Contact Number A 1 Eline Unit 777 -8389 office Pollard Billy pp ewhite (3) x.xx" OD Radial Torch 252 -1517 cell 283 -3214 Home (1) 85 -40 Anchor Latch Seal Assy, Plastic Coated ID w/ Hydril 563 Baker Jerry Winfrey box w/ CB Ring 776 -8131 office Overshot w/ 6-1/4 shoe Grapple(s) f/ tbg stubs Baker PetroLite Todd Stone CRW 132 w/ Oxygen Scavenger 283 -4634 office 777 -8420 office Ted Kramer Operations Engineer 985- 867 -0665 cell Hilcorp Mike Dunn Reservoir Engineer 777 -8382 Office Chris Myers Area Operations Manager 777 -8333 Office 907 - 398 -9955 Cell Dona GnF S 0 1 , , 1 1 i Hilcorp Alaska Cudd Snubbing 13 %" 5M HWO Stack L_ '\ c) - 0 13 - 5 / 8" 5 c p HYDRILi t.. . v. 0 . .... cf (3 \ HEIGHT' 54-1/8' INCHEy VLIGHTI 13,800 LBS a l li l l i bra t REA1?• i 0 0 ) \ 1 I 1.1/ LP sal ImP LP Y A, Ce i s Pipe Mike Freeman — C (OD 713-252-1944 Ohl& Houston, Tx. c 1 11 „. El 111 COD caster Bonnets Instd. : ---1_(1 Und/Shear _ • •, ., .... . ) 11 — ILIP NJ LP , — - - — • II 44 _ -- • r. mu_ING 0 • _..... SPOOL n ” eh ria eft a C t t ...a 4-1/16° 94 4-1/16' 541 5M VALV S -x- -5- 2-2/W 514 2-1/16 5M M.A. ASA Pipe "ism 1-1 -, ( 0 ) . . ., . . __,„„ • • Ferguson, Victoria L (DOA) From: Ted Kramer [tkramer @hilcorp.com] Sent: Wednesday, May 02, 2012 11:53 AM To: Ferguson, Victoria L (DOA) Cc: Schwartz, Guy L (DOA) RE: Dolly y Varden D -6RD Victoria, We will install an SSV if required. Static pressure assumed is 3800 psi. Pressure on the tubing is 0 psi. Ted Kramer Sr. Operations Engineer Hilcorp Alaska, LLC Office Phone 907 - 777 -8420 Cell Phone 985 - 867 -0665 From: Ferguson, Victoria L (DOA) f mailto :victoria.ferguson @alaska.clovl Sent: Wednesday, May 02, 2012 11:28 AM To: Ted Kramer Cc: Schwartz, Guy L (DOA) Subject: RE: Dolly Varden D -6RD Ted, Are you planning to install a surface safety valve in accordance with 20 AAC 25.265? What is the static reservoir pressure assumed? Is there currently any pressure on the tubing? Thanx, Victoria From: Ted Kramer f mailto:tkramer @hilcorp.coml Sent: Wednesday, May 02, 2012 10:13 AM To: Ferguson, Victoria L (DOA) Cc: Schwartz, Guy L (DOA) Subject: RE: Dolly Varden D -6RD Victoria, The Answers to your questions are below in blue. The wellhead schematic you requested is attached. If you have any other questions , please let me know. 1 • • Ted Kramer Sr. Operations Engineer Hilcorp Alaska, LLC Office Phone 907 - 777 -8420 Cell Phone 985 - 867 -0665 From: Ferguson, Victoria L (DOA) f mailto :victoria.ferguson ©alaska.govl Sent: Tuesday, May 01, 2012 9:09 AM To: Ted Kramer Cc: Schwartz, Guy L (DOA) Subject: Dolly Varden D -6RD Ted, Received your sundry(10 -403) to replace tubing and convert to water injection. Could you please provide the following information ?: 1. Detail of the MASP calculation Since the static bottom hole pressure of D -6rd is unknown, The MASP Calculation is based on the reservoir pressure of the offset well with the highest recorded static reservoir pressure recorded after a 3 month shut in in 2009 during the Redoubt Volcano Eruption. The gradient is calculated from this static assuming a 95% water cut and a 1,000 ft column of oil on the top edge (safety factor). That gradient for this well is 0.331 psi /ft. 2. Status of the SSV. Is it still intact? There is currently not an SSV on this well. 3. Wellhead and tree schematic - Attached 4. Was the previous MIT on the tubing or the annulus? The previous MIT was conducted on the annulus. Thanx in advance, Victoria Victoria Ferguson Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave, Ste 100 Anchorage, AK 99501 Work: (907)793 -1247 victoria.ferquson(a alaska.gov 2 n 41 Dolly ValTden Platform D -6RD Current 05/02/2012 Hilrnn :11arka.1.1.4 Tubing hanger, CIW - D -6RD DCB, 11 X 3'/z EUE 133/8 X95/8X7X 8rdliftand3 %EUE 3 1/2 susp, w/ 3" type H BPV profile, 6 1/4" EN, 'A" BHTA, CIW, 3 1/8 5M non continuous control FE X External Acme line knockup Immetwour �., ..t air Valve, swab,CIW-FL, 3 1/8 5M FE, HWO, =" e: T -24 jS Tee, stdd, 3 1/8 5M X 31/85M 'I` Valve,upper master,KM -M, °_, 0 W 3 1/8 5M FE, HWO, T -24 1: ®® I II I MU- Valve, master, WKM -M, `,, 0p 3 1/8 5M FE, HWO, T -24 Adapter, CIW -FBB, 11 5M itt a1 i �e. itt FE X 3 1/8 5M, prepped for =lit 6 1/4" extended neck, 1 /2npt 4 --- = - control line port Tubing head, CIW -DCB, 1.1 lI 111 - 13 5/8 3M X 11 5M, w/ 2- 2 1/16 5M SSO, X- 4•0 - - ' Valve, CIW -F, 2 1/16 5M bottom prep w/ 1.1 [ �q)1 i0.: FE, HWO, AA 1 % VR profile `■`' In ul Casing spool, CIW -WF, :I: 135/83MX135/83M, 1at1 ! III w/ 2- 2 1/16 5M EFO ge i O Valve, CIW F, 2 1/16 5M III. iirllli,11111� x4111)11•• i FE, HWO, AA 111 i * nl Casing head, CIW -WF, r 1 13 5/8 3M X 13 3/8" csg ill thrd bottom, w/ 2- 2 1/16 111 Valve, CIW -F, 2 1/16 5M 2M EFO - _ I k. FE, HWO, A �h/411f11'-.i_ ;. 4 il- STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casin~: Repair well: Plugging: Time extension: Stimulate: ' Change approved program: Pull tubing: Variance: Perforate': X Other: X (convert to inj.) 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) Union Oil Company of California (UNOCAL) Development: 106' RT above MSL feet 3. Address Exploratory: 7. Unit or Property name P: O. Box 196247 Stratigraphic: Anchorage, AK 99519-6247 Service: X Trading Bay Unit 4. Location of well at surface ,,/ './ ',-'/ 8. Well number 673' FSL & 1220' FWL of Sec.6, T8N, R13W, SM Dolly Varden D-6RD At top of productive interval 9. Permit nu,/mt)er 2490' FNL & 1433' FEL of Sec.8, T8N, R13W, SM 82-20 -- At effective depth 10. APl number 2589' FNL & 1304' FEL of Sec.8, T8N, R13W, SM 50- 733-20147-01 At total depth 11. Field/Pool 2608' FNL & 1275' FEL of Sec.8, T8N, R13W, SM McArthur River/Hemlock Pool 12. Present well condition summarYdepth: 3,833' 'v/' Plugs (measured) r~ Total measured I / feet 13730'-13833' c..,, true vertical 10,298'~/ feet Effective depth: measured 13,730' feet Junk (measured) None AUG 24 200'~ true vertical 10,191' feet Alaska 0il & Gas Cons. Commission Casing Length Size Cemented Measured depth Al'lC~rtical depth Structural Conductor Surface 2477' 13-3/8" 2400 sx 2477' 2282' Intermediate 6652' 9-5/8" 3000 sx 6652' 4831' Production 13833' 7" 1860 sx 13833' 10298' Liner Perforation depth: measu red 13148'-13169', 13212'- 13230', 13255'- 13280', 13300'- 13320', 13400'- 13450', 13470'- 13490', 13518'-13550', 13565'-13595', 13655'-13690' true vertical 9633'-9653', 9694'-9711' , 9735'-9759', 9777'-9796', 9873'-9921', 9940'-9959', 9986'-10017', 10031'-10060', 10118'-10152 Tubing (.size, grade, and measured depth) 3-1/2", 9.2#, L-80 @ 12,539' Packers and SSSV (type and measured depth) SSSV @ 323' Baker SAB perm packer & K-22 anchor/seal assy. @ 12,465' Baker FB-2 top isolation packer @ 13,110' Baker F-1 perm bottom isolation pkr @ 13,291' 13. Attachments Description summary of proposal: x Detailed operations program: BOP sketch: Attached Procedure for Perforating, Wireline Conversion to injection and MIT 14. Estimated date for commencing operation 15. Status of well classification as: 8/28/2001 16. If proposal well verbally approved: Oil: Gas: Suspended: Name of approver Date approved Service: x (intend to convert to G-zone injector) 17. I hereby~~s true and correct to the best of my knowledge. Signed:~ ~/~7.//.~.,/ -(~hris Ruff Title: Senior Reservoir Engineer Date: 8/24/2'~ ' ~ FOR COMMISSION USE ONLY Conditions of Plugappr°val:integrity~N°tifyCommission.~BopSO 'representatiVeTest may witnessLocation clearance I Approval No. Mechanical Integrity Test~ Subsequent form required 10- t.-tOt'~ - · Approved by order of the Commissioner Cammy Oechsli Commissioner Date~ - Form 10-403 Rev 06/15/88 ORIGINA[ / SUBMIT IN TRIPLICATE UNOCAL Granite Point Field Well # D-6RD Slickline Proposal Revised 8/22/01 Rev #1 Assembled by C. Ruff/S. Tyler Obiectives: 1. Convert to an injector. a) Gage/Clean Tbg b) Replace GLV's w/Dummy Valves c) Conduct an MIT. Wireline Problems: Tubing Size: 3-1/2", 9.2#, L-80 Imp. Butt Elevations sssv Pkr X Nipple WLEG (EOT) RECEIVED 12465' 12506' 12539' AUG 24 2001 Minimum I.D. SSSV ???" @ 323' Alaska 011 & Gas Cons. C0mmissi~ 3.5" X Nipple 2.813"ID @ 12,506 Anchorage Deviation: Max 55° @ 2,900', KOP 800' TOP BTM ZONE SPF DATE COMMENTS Perforations: 12639 ~ Prop6sed G-2 Perfs TBD Proposed 12712 12735) Proposed G-3 Perfs TBD Proposed 12787 12812 G-4 12 4/30/00 13148 13155 HB-1 8 4/16/87 Isolated by WO 13155 13164 HB-1 16 4/87 & 10/84 Isolated by WO 13164 13169 HB-1 8 10/11/84 Isolated by WO 13212 13230 HB-2 2 5/2/82 Isolated by WO 13255 13280 HB-2 2 5/2/82 Isolated by WO 13300 13320 HB-3 4 4/16/87 13400 13450 HB-4 12 5/2/82 & 4/16/87 13470 13490 HB-4 12 5/2/82 &4/16/87 13518 13525 HB-4 8 4/16/87 13525 13545 HB-4 12 5/2/82 &4/16/87 13545 13550 HB-4 8 4/16/87 13565 13595 HB-5 4 4/16/87 13655 13690 HB-5 4 4/16/87 Btm perf= 10152' TVD SChematic Location http://k~diak.anch~rt~wn.un~ca~.c~m/da~redirect.asp?temp~ate=d~cViewer.asp[[4lI3=5~733201470 1 ][rmLabel3=D-6RD \\Ak~Anch~rage\Gr~u~s\~E\~EFie~dsxTbuxD~y\We~sxD-~6xD-6RDInjLpr~jects~D-6rd Conversion to Inj Procedure.doc Slickline Procedure I)-6RD Slickline Work [Gage tbg, Replace GLV's w/Dummys] Hold Prejob safety meeting w/applicable personnel. RU slickline unit, BOP's and lubricator. Pressure test to 2500 psi. MU 2.7" gauge ring onto slickline tools string. 3. RI and tag fill. ( Last fill tagged on 11/19/00 w/2.73" gauge ring @ 13,100' ) POH. 4. Break-out gauge ring. 5. MU KO & PT. RI retrieve GLV's 1 through 11. Replace with Dummy valves. II. Pressure Testing to Determine Tubular Integrity 1. Pressure test tbg/csg annulus to 2200 psi. Monitor tbg pressure. (may have to remove Dummy GLV #1 to fill up annulus, if so remember to replace the dummy before pressure testing.) 2. If csg pressure bleeds off, then RI w/Slickline, set a plug in the "X" nipple @ 12,506'. 3. Pressure test tbg to 3,000 psi. Monitor csg pressure. 4. Pressure test csg to 2200 psi. Monitor tbg pressure. Send results back to Anchorage. 5. Retrieve plug. RD Slickline. III. Conduct a Pressure MIT (Pending results from Pressure Testing) 1. Advise Tom Maunder at AOGCC of MIT at least 24 hours in advance of test. Phone number to reach him is (907) 793-1250. This will allow sufficient time for inspector to make arrangement to witness test. 2. Rig up pressure recorders on both the tubing and the tbg/csg annulus. (Only ifAOGCC Rep is not on Location) 3. Record pretest conditions of the tubing and the tbg/csg annulus on the attached form. 4. Hold a prejob safety meeting with Production Forman, and Operators. 5. Pressure test all applicable surface equipment lines to 2,500 psi. 6. Isolate the tbg/csg annulus relief valve, if applicable, for the test. Pressure up with FIW on the tbg/csg annulus to a surface pressure greater than 2200 psi. Call Anchorage if this pressure cannot be obtained. 7. Record each tubing pressure, the tbg/csg annulus pressure and time at the start of the test on the attached form. 8. After 15 minutes record each tubing and the tbg/csg annulus pressures, on the attached form. 9. After 30 minutes record each tubing and the tbg/csg annulus pressures, on the attached form. 10. Bleed down the tbg/csg annulus pressure. 11. If the pressure change for the 30 minute interval was less than 10% of the starting pressure and the pressure in the last 15 minutes of the test has either stabilized or is trending toward stabilization when compared to the change that occurred during the first 15 minute interval, both the tubing and casing have passed the integrity test. If test fails, call Anchorage. NOTE:If during test the well restablizes, then restart the test. Finish the attached form, sign and send to Anchorage for filing with AOGCC. uNOCAL ) RKB to TBG Head = 39' DVT @ 7592' Dolly Varden Platform Well D-6RD Completed 4/8/00 CASING AND TUBING DETAIL SIZE WT GRADE CONN TOP BOTTOM 13-3/8" 61 9-5/8" 4047 7" 29 N-80 7" DV tool at 7592' Tubing 3-1/2" 9.2 L-80 3-1/2" 9.2 L-80 NO. Depth Item Butt 0 2477' 0 6652' 0 13833' Imp. Butt 0 12539' Imp. Butt 13111' 13367' JEWELRY DETAIL 1 39' 3-1/2" 2 323' SSSV 3 2304' 3-1/2" 4501' 3-1/2" 6465' 3-1/2" 7864' 3-1/2" 8886' 3-1/2" 9634' 3-1/2" 10254' 3-1/2" 10900' 3-1/2" 11488' 3-1/2" 12062' 3-1/2" 12424' 3-1/2" 4 12465' 5 12506' 6 12539' 8rd DCB Cameron Tbg hgr w/H BPV SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ SMO-1 GLM w/ R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch R-1 valve and BK-2 latch SMO-1 GLM with orifice and BK-2 latch Baker SAB perm packer & K-22 anchor/seal assy. 3-1/2" X nipple, 2.813" ID 3-1/2" tbg tail, WLEG 7 13110' 8 13291' 9 13335' 10 13367' TOP BTM Baker FB-2 top isolation packer Baker F-1 perm bottom isolation pkr (no MOE) 3-1/2" X nipple, 2.813" ID, w/"PX" plug in place & 10' of CaCO3 on plug 3-1/2" tbg tail, WLEG PERFORATION DATA ZONE SPF DATE COMMENTS 12787 12812 G-4 12 4/30/00 Rig CO to 13702' dpm on 4/5/00 TD = 13833' MD, PBTD = 13730' Hole Angle = 14°at PBTD Max Hole Angle = 55° @ 2900' MD KOP = 800' 13148 13155 HB-1 13155 13164 HB-1 13164 13169 HB-1 13212 13230 HB-2 13255 13280 HB-2 13300 13320 HB-3 13400 13450 HB-4 13470 13490 HB-4 13518 13525 HB-4 13525 13545 HB-4 13545 13550 HB-4 13565 13595 HB-5 13655 13690 HB-5 8 16 8 2 2 4/16/87 Isolated by WO 4/87 & 10/84 Isolated by WO 10/11/84 Isolated by WO 5/2/82 Isolated by WO 5/2/82 Isolated by WO 4 12 12 8 12 8 4 4 4/16/87 5/2/82 & 4/16/87 5/2/82 &4/16/87 4/16/87 5/2/82 &4/16/87 4/16/87 4/16/87 4/16/87 Btm perf = 10152' TVD REVISED: 8/24/2001 DRAWN BY: TAB ALASKA OIL AND GAS CONSERVATION COMMISSION MECHANICAL INTEGRITY TEST Date Company: UNOCAL Field McArthur Rv. Fid/Dolly Platform. PKR TVD MD 9076 12,539 CASING SIZE/WT/GRADE 7"- 29#- NS0 TBG SIZE 3-1/2" REQ TEST PRESS 2,198 PRETEST TBG CSG PRESS START TIME TBG CSG PRESS 2200 15 MIN TIME TBG CSG PRESS 30 MIN TIME TBG CSG PRESS 0 9 Comments: Req Test Pressure' 9076 * .25 = 2269 psi, but 70% of the casing burst strength is 2,198 psi. Therefore MIT will only be run to 2,200 psi. Comments: P F * TUBING INJECTION FLUID P = PRODUCE WATER INJ S = SALT WATER INJ M = MISCIBLE INJECTION I = INJECTING N = NOT INJECTING ANNULAR FLUID: GRADIENT WELL TEST Initial 4-year~ DIESEL Workover GLYCOL SALT WATER Explain DRILLING MUD OTHER OTHER AOGCC WITNESS SIGNATURE COMPANY REP SIGNATURE ELECTRIC LINE PROCEDURE Well: D-6rd Facility: Dolly Varden Platform Field: McArthur River Leg: B1 Conductor: 2 APl #: 50-733-20147-01 AFE #: 149062 Operation: Perforate UNOCAL ) Objective: Perforate G2 & G3 Perforating guns to be used: Type (Strip or hollow carrier): Size: Phasing: Shots per foot: Maximum gun length: PowerJet HC 2-1/2" 60° 6 25' Status: Tubing: Tubing tail: Casing: WH Connection: Min. ID/Depth: ETD/Date: Gauge OD/Date: RKB: THF to RKB: Deviation (Max.): HzS concentration: 3-1/2", 9.2#, L-80 12,539' (upper string)& 13,367' (lower string) 7", 29#, N-80 4-1/2", 8 md. 2.813" @ 12,506' (upper); 2.813"@ 13,335' (lower) To be run ?'~-) be run 106' 39' 55° 650 ppm Special Concerns: · All guns will be shot with well shut-in. · The SAFE system will be used to fire all guns. · This is a designated H2S facility. D-6rd Perf 6-01.doc Ralph P. Holman 08/22/01 Page 1 Cohtacts: Name Office Home Cell Hal Martin 7675 345-3814 230-5163 Matt Frankforter 7877 345-0797 Don Byrne 7835 696-1583 250-2712 Dan Williamson 7677 248-7558 223-2926 Ralph Holman 7838 563-6923 229-3199 Pager 268-0977 268-5035 268-5582 I. Hold safety meeting with production, drilling and Schlumberger personnel. 1. Establish that the tree valves are not leaking. . o Review UNOCAL Perforating / Explosives Safety Checklist (attached). The SAFE system will be used to fire all guns therefore radios, welding, cathodic protection, etc. do not need to be shut down. (Note: There will be no helicopter landings during arming of perforating guns.) 4. Ensure that lubricator can be bled off to facility system. 5. Establish tag out procedure for wellhead valves while wireline is in the well. . . Spot SCBA's for rig up/rig down operation. Production will issue a hot work permit to Schlumberger for perforating. 8. Establish that well room is free of gas and H2S. o Establish whom Schlumberger is to contact for pressure test and to operate wellhead valves. 10. Warn all non-Schlumberger personnel to stay clear of gun loading / arming area. 11. Note: A pump-in sub with a valve is required below the wireline BOP's. 12. 13. Open well room exterior door prior to breaking lubricator. If well has a SSSV, ensure that it is pumped up to 3000 psi and blocked in the open position. D-6rd Perf 6-01.doc Ralph P. Holman Page 2 08/22/01 14. The Unocal on-site foreman and the Schlumberger engineer will discuss the following tie-in information: Gamma ray character and collar spacing. · Varify that there is enough data to ensure an accurate tie-in. · Required logging depths and potential wellbore problems that may prevent obtaining logs of sufficient quality at those depths. · A call will be made to the on-call supervisor or engineer of a reasonable doubt exists that the correlation is accurate. II. Pressure test lubricator with FIW or glycol depending on the temperature to 500 PSI for a low pressure test and check for leaks. Then, test to 2500 PSI or 500 PSI above shut-in tubing pressure, whichever is greater and check for leaks. III. Perforate the following intervals and record information listed on the "INDIVIDUAL GUN RUN REPORT". . PU gun, e-line jars, CCL and weight bars and RIH with well shut in noting nipples, GLM' s, etc. on the way in. . . Log up through EOT to confirm depth. RIH to TD and tie in with Schlumberger GR/CCL dated 4/9/00. . o RIH and log up into position starting at the lowermost perforated interval. When Schlumberger and UNOCAL witness have agreed on depth, fire gun. (Note: watch weight increment indicator for indication that gun fired). ZONE TOP BOTTOM FEET G3 12,712 12,735 23 G2 12,639 12,657 18 TOTAL: 41 . . POOH, RD Turn well over to Production. D-6rd Perf 6-01.doc Ralph P. Holman 08/22/01 Page 3 Unocal Corporation P.O. Box 196247 Anchorage, AK 99501 Telephone (907) 263-7660 UNOCALe) Dan Williamson Drilling Manager 12/19/OO Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 At"tn: Mr. Robert Christensen Subject: Trading Bay Unit Well D-6rd APl No. 50-733-20147-01 10-404 StressFrac G-4 Zone Dear Mr. Christensen: Please find enclosed in duplicate Form 10-404 for the StressFrac stimulation of the G4 bench in well D-6rd. The following intervals were stimulated on 12/5/00: Bench Top Bottom Feet Max. PSI G4 12,800 12,812 12 4000 G4 12,787 12,799 12 6000 TOtal: 24 If you have any questions, please contact Ralph Holman at 263-7838. Dan Williamson Drilling Manager RECEIVED JAN 22 2001 Alaska Oil & Gas Cons. Commission Anchorage STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION CUMMISSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown: Stimulate: x Plugging: Perforate: Pull tubing: Alter casing: Repair well: Other: 2. Name of Operator Union Oil of California (Unocal) 3. Address · · P.O. Box 196247 Anchorage, Alaska 99519-6247 4. Location of well at surface 673' FSL, 1220' FWL, Sec. 6, T8N, R13W, SM At top of productive interval 2490' FNL, 1433' FEL, Sec. 8, T8N, R13W, SM At effective depth 2589' FNL, 1304' FEL, Sec. 8, T8N, R13W, SM At total depth 2608' FNL, 1275' FEL, Sec. 8, T8N, R13W, SM 5. Type of Well: Development: X Exploratory: Stratigraphic: Service: 6. Datum elevation (DF or KB) 106' RT above MSL 7. Unit or Property name Trading Bay Unit 8. Well number D-6rd feet 9. Permit number/approval number 82-20 10. APl number 50-733-20147-01 11. Field/Pool McArthur River/Hemlock 12. Present well condition summary Total depth: measured 13833 true vertical 10298 feet Plugs (measured) 13730'-13833' cmt. feet Effective depth: measured 13730 true vertical 10191 feet Junk (measured) feet Casing Length Structural Conductor Surface 2477' Intermediate 6652' Production 13833' Liner Perforation depth: measured true vertical Tubing (size, grade, and measured depth) Size Cemen~d Measured depth True verticaldepth 13-3/8" 2400 sx 2477' 2282' 9-5/8" 3000 sx 6652' 4831' 7" 1860 sx 13833' 10298' 12787-12812~13148-13169~13212-1323~~13255-1328~~133~~-1332~~134~~-1345~~1347~-1349~~ 13518-13550,13565-13595,13655-13690 9293-9316~9633-9653~9694-9711~9735-9759~9777-9796~9873-9921~994~-9959~9986-1~~17~ 10031-10060,10118-10152 3-1/2",9.2#,L-80from 0'-12539'& 13111'-13367' Packers and SSSV (type and measured depth) Baker SAB @ 12465', Baker FB-2 @ 13110', Baker F-1 @ 13291' 13. Stimulation or cement squeeze summary Stimulated G4 interval with StressFrac Intervals treated (measured) 12787'-12812' Treatment description including volumes used and final pressure 12787'-12799': 2.5" x 12' StressFrac tube. Maximum pressure reached: 6000 psi 12800'-12812': 2.5" x 12' StressFrac tube. Maximum pressure reached: 4000 psi 14. Representative Daily Average Production or Injection Data OiI-BBL Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation 0 0 0 20 100 Subsequent to operation 0 0 0 20 100 15. Attachments: Copies of Logs and Surveys run: Daily Report of Well Operations: 16. Status of well classification as: Oil: X Gas: Suspended: e v,o..R ECEIVED 17. I hereby certify that the foregoing is true and correct to the best of my knowledge: Signed: Form 10-404 Rev 06/15/88 Title: JAN 22 200 AJaska 0il & Gas Cons. bomrmssi0~ Anchorage Date:/-'" ~1~ ~/ SUBMIT IN DUPLICATE STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OIL: X GAS: SUSPENDED: ABANDONED: SERVICE: 2. Name of Operator 7. Permit Number Unocal Oil Company of California (UNOCAL) 82-20/300-035 3. Address 8. APl Number P. O. Box 196247, Anchorage, Ak 99519 50- 733-20147-01 4. Location of well at surface Leg B1, Slot 10 Ste~h_~ed~.l~m.,~_~,_~:i~,.~. '~ · 9. Unit or Lease Name 673' FSL, 1220' FWL, Sec. 6, T8N, R13W, SM ~ .¢-:'0~'':?t.~7~i0?~ l .[LL~L~,,.~,~me.! '~... Trading Bay Unit At Top Producing Interval t O~B ! { 'J~' ' i. 10. Well Number 2490' FNL, 1433' FEL, Sec. 8, T8N, R13W, SM "-"--~~'[[ ~~. '.5,~,~o ~;~;;~ ~ Dolly Varden D-6RD 2608' FNL, 1275' FEL, Sec. 8, T8N, R13W, SM '~ 5. Elevation in feet (indicate KB, DF, etc.) ~ 6. Lease Designation and Serial No. McA~hur River Field 106' RT above MSL~ ADL, 18729 A-926 G zone 12. Date Spudded3/19/1982 13' Date T'D' Reached 1'14' Date C°mp" Susp' °r Aband' I 15' Water Depth' if °fish°re I 16' N°' °f C°mple~°ns4/19/82 5/10/82 90 feet MSL 1 17. Total Depth (MD+TVD)1~33, MD/10298' TVD 18. Plug Back Depth (M D+TVD)13730, MD/10191' TVD I 19' Directi°nal Sudsy I20' Depth whore SSSV sotYes: ,o: X 323 feet MD I21' Thickness °f Pormafr°stNA 22. Ty~ Electric or Other Logs Run 23. CASING, LINER AND CEMENTING RECORD S~ING DEPTH MD CASING SIZE ~. PER ~. G~DE TOP BOSOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 1~3/8" 61~ K-55 0 2477' 1%1/2" 2~0 sx 0 9-5/8" 40, 43.5, 47~ N-80 0 6652' 12-1/4" 3000 sx 0 7" 29~ N-80 0 1~33' 8-1/2" 1860 sx 0 24. Perforations open to Production (MD+~D of Top and BoEom and 25. TUBING RECORD inte~al, size and number) SIZE DEPTH SET (MD) PACKER S~ (MD) G-4 12,787'-12,812' MD 9299'-9321' ~D 10 spf 0.36" dia 3-1/2" 12,539' 12,465' 26. ACID, FRACTURE, CEMENT SQUEEZE, ~C. 0RI¢INAL DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 10731'-13835' MD 9258'-9660'~D SIoEed liner 27. PRODUCTION TEST Date First Producaon ~ Method of Operation (Fl~ing, gas lift, etc.) 4/10/2000~ Gas Lift Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ~ GAS-OIL RATIO 4/10/2000 24 TEST PERIOD => 0 0 0 NA~ NA Flow Tubing Casing Pressure CALCU~TED OIL-BBL GAS-MCF WATER-BBL OIL GRAVIS-APl (corr) Press.. 100 1~0 24-HOUR ~TE => 0 0 0 NA 28. CORE DATA Brief description of lithology, porosi~, fractures, apparent dips and presence of oil, gas or water. Submit core chips. '"' 2000 AFE #136432 Form 10-407 Rev. 7-1-80 CONTINUED ON REVERSE SIDE Submit in duplicate 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and lime of each phase. G-4 12787'-12812' 9299'-9321' No production. 31. LIST OF ATTACHMENTS Wellbore schematic, Daily Summary of Rig Operations, Directional Survey Record 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed(~~~ ~ ~~'~ ~'~ ~T / I Title R:~-Drillinq Manaqer Date ~ '~ j (~(~ INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and Icg on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other space on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the productin intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Form 10-407 Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28: If no cores ~ken, indicate "none". UNOCAL ) RKB to TBG Head = 39' SIZE WT Dolly Varden Platform Well D-6RD Completed 4/8/00 CASING AND TUBING DETAIL GRADE CONN TOP BOTTOM DVT @ 7592' G-4 13-3/8" 61 9-5/8" 40-47 7" 29 N-80 7" DV tool at 7592' Tubing 3-1/2" 9.2 L-80 3-1/2" 9.2 L-80 NO. Depth Item Butt 0 2477' 0 6652' 0 13833' Imp. Butt 0 12539' Imp. Butt 13111' 13367' JEWELRY DETAIL 1 39' 3-1/2" 2 323' SSSV 3 2304' 3-1/2" 4501' 3-1/2" 6465' 3-1/2" 7864' 3-1/2" 8886' 3-1/2" 9634' 3-1/2" 10254' 3-1/2" 10900' 3-1/2" 11488' 3-1/2" 12062' 3-1/2" 12424' 3-1/2" 4 12465' Baker 5 12506' 3-1/2" 6 12539' 3-1/2" 8rd DCB Cameron Tbg hgr w/H BPV SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM w/R-1 valve and BK-2 latch SMO-1 GLM with orifice and BK-2 latch SAB perm packer & K-22 anchor/seal assy. X nipple, 2.813" ID tbg tail, WLEG 7 13110' 8 13291' 9 13335' 10 13367' TOP BTM Baker FB-2 top isolation packer Baker F-1 perm bottom isolation pkr (no MOE) 3-1/2" X nipple, 2.813" ID, w/"PX" plug in place & 10' of CaCO3 on plug 3-1/2" tbg tail, WLEG PERFORATION DATA ZONE SPF DATE COMMENTS 12787 12812 G-4 10 4/9/00 and 4/29/00 Rig CO to 13702' dpm on 4/5/00 TD = 13833' MD, PBTD = 13730' Hole Angle = 14°at PBTD Max Hole Angle = 55° @ 2900' MD KOP = 800' 13148 13155 HB-1 13155 13164 HB-1 13164 13169 HB-1 13212 13230 HB-2 13255 13280 HB-2 13300 13320 HB-3 13400 13450 HB-4 13470 13490 HB-4 13518 13525 HB-4 13525 13545 HB-4 13545 13550 HB-4 13565 13595 HB-5 13655 13690 HB-5 8 16 8 2 2 4/16/87 isolated by WO, 4/00 4/87 & 10/84 isolated by WO, 4/00 10/11/84 isolated by WO, 4/00 5/2/82, isolated by WO, 4/00 5/2/82, isolated by WO, 4/00 4 12 12 8 12 8 4 4 4/16/87, isolated by PX plug, 4/00 5/2/82 & 4/16/87, isolated by PX plug 5/2/82 &4/16/87, isolated by PX plug 4/16/87, isolated by PX plug, 4/00 5/2/82 &4/16/87, isolated by PX plug, 4/0( 4/16/87, isolated by PX plug, 4/00 4/16/87, isolated by PX plug, 4/00 4/16/87, Btm perf = 10152' TVD D-6RD 4-8-00.doc REVISED: 5/28/00 DRAWN BY: TAB UNOCAL Alaska Drilling Drilling Summary Report D-6RD 4/3/00 to 4/30~00 413/00 4/4/OO 4/5/00 4/6/0O 4/7100 4/8/00 4/9/00 Move rig from D-25Rd to D-6RD. ND tree, NU BOPE. Test BOPE. Engage tubing hanger, pull 130K and seals pulled free. Circ BU. POOH laying down 3-1/2" tubing. RIH with packer mill on drill pipe. Tag packer at 12766' dpm (8' shallow to E-line packer set in 1987). Mill packer from 12766' to 12768.5'. Packer fell free, RIH with kelly to 12788'. POH with tight spots every collar up to 12,000'. POOH and recovered only .75' of packer, left 9.38' long seal bore extension in well. RIH with spear to 13,705'. POOH with fish, recovered 10' seal bore extension. RIH with cleanout assembly. Work thru tight spots at 13329'-13338' and at 13562'. Tag bottom at 13702'. POH, work through tight spot at 13552'. POH to 13390', circ hi-vis sweep with minimal recovery. POH to 8500' and circulate. POH to 5500' and circulate. POOH with cleanout assy. RIH with lower scab packer with plugged tubing tail on J running tool and drill pipe. Pipe filled on its own through J running tool. RU Schlumberger and run GR thru drill pipe. Correlate depth and place packer at 13291' elm. RD Schlumberger. Attempt to circulate, no circ at 500 psi. Attempt to reverse circulate, no flow up drill pipe. Pressure up drill pipe to 2500 psi without dropping ball, observe packer set at 800 psi. PU 12k lbs to shear release running tool as planned except no ball was ever dropped. POOH with drill pipe draining. J running tool and drill pipe was clear at surface. (Schlumberger logging tools probably shifted running tool sleeve closed on previous day.) RIH with upper scab packer assembly. Latch into bottom packer, unlatch and PU 1'. Drop ball and set upper scab packer at 13111' with 2500 psi. Test annulus to 1500 psi, good. Bleed pressure and PU to neutral, rotate with some difficulty 20 rounds to the right. Packer had not released. Blow ball at 3200 psi, then rotate again with less torque and packer released after 12 rounds. POOH, running tool OK. Run 3-1/2" gas lift completion with RHC plug in X nipple and isolation sleeve in SSSV nipple. Displace tubing and annulus to diesel, 500 bbls. Drop ball/bar to land in RHC plug and set SAB packer at 12465', tubing tail at 12539'. RU slickline and recover SSSV sleeve, ball/bar and RHC plug from X nipple. Pressure test ~ubing to 1500 psi to confirm packer set. ND 4/10/00 4/29/00 4/30/00 BOPE, NU and test tree. RU Schlumberger and perforate G-4 zone at 5 spf from 12787'-12812'. RD Schlumberger and release rig to D-8RD workover. RU flowline and gas lift line. Gas lift well with no inflow from formation. RU Schlumberger. Reperforate G-4 zone at 12787'-12812' with 2-1/2" gun at 5 spf. Stuck gun at 140' while POOH. Pull out of rope socket. RU slickline. Set down on fish at 127' with overshot. Pushed fish to 13,220'. Latch fish and POOH with full gun recovery, all shots fired. D-6RD still will not flow any fluid from G-4 interval. AJa~a Oit & Gas Cc~s. Con~msior~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon: Suspend: Operation shutdown: Re-enter suspended well: Alter casing: Repair well: X Plugging: Time extension: Stimulate: Change approved program: Pull tubing: X Variance: Perforate: X Other: X/convert to prod.) 2. Name of Operator 5. Type of well: 6. Datum elevation (DF or KB) Union Oil Company of California (UNOCAL) Development: 106' RT above MSL feet 3. Address Exploratory: 7. Unit or Property name P. O. Box 196247 Stratigraphic: Anchorage, AK 99519-6247 Service: X Trading Bay Unit 4. Location of well at surface ,/" ,/' ,-~ 8. Well number 673' FSL & 1220' FWL of Sec.6, T8N, R13W, SM Dolly Varden D-6RD At top of productive interval 9. Permit nuJ~ber 2490' FNL & 1433' FEL of Sec. 8, T8N, R13W, SM 82-20 At effective depth 10. APl number 2589' FNL & 1304' FEL of Sec. 8, T8N, R13W, SM 50- 733-20147-01 At total depth 11. Field/Pool 2608' FNL & 1275' FEL of Sec. 8, T8N, R13W, SM McArthur River/Hemlock Pool 12. Present well condition summary ./" Total depth: measured 13,833' ~'feet Plugs (measured) 13730'- 13833' cmt true vertical 10,298' feet Effective depth: measured 13,730' feet Junk(measured) NoneORIGINAL true vertical 10,191' feet Casing Length Size Cemented Measured depth True vertical depth Structural Conductor Surface 2477' 13-3/8" 2400 sx 2477' 2282' Intermediate 6652' 9-5/8" 3000 sx 6652' 4831' Production 13833' 7" 1860 sx 13833' 10298' Liner Perforation depth: measured 13148'-13169', 13212'-13230', 13255'-13280', 13300'-13320', 13400'-13450', 13470'-13490', 13518'- 13550', 13565'- 13595', 13655'- 13690' true vertical 9633'-9653', 9694'-9711', 9735'-9759', 9777'-9796', 9873'-9921', 9940,-9~,,~-.[.~-~V~=U 9986,-10017,, 10031,-10060,, 10118,-10152 Tubing (size, grade, and measured depth) 3-1/2", 9.3#, N-80 @ 12,843' FEB 63 000 Packers and SSSV (type and measured depth) Baker FB-1 perm packer @ 12774' Ala.qk8 Oil & Gas Cons. C0mmbl 13. Attachments Description summary of proposal: x Detailed operations program: BOP sketch: x Anchorage 14. Estimated date for commencing operation 15. Status of well classification as: 2/25/00 16. If proposal well verbally approved: Oil: Gas: Suspended: Name of approver Date approved Service: x (intend to convert to G-zone producer/ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed:~ ~ /?~ Dan Williamson Title: Drilling Manager Date: 2/2/2000 FOR COMMISSION USE ONLY Conditions of approval: Notify Commission so repres~,~.tative may witness I Approval No. Plug integrity,~ BOP Test ~ Location clearanceI &7 Mechanical Integrity Test Subsequent form required 10- ~-~ ~'~ - - ORIGINAL SIGNED-BY Robert N. Christenson ~'7 . Approved by order of the Commissioner Commissioner Date c94 '"'/ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE UNOCAL Dolly Varden ,¢'ell #D-6RD Rig Workover Proposed Workover Procedure Objective: The objective of the workover on D-6RD is to convert the well from a Hemlock injector to a G-zone producer. The well is currently a water injector in the Hemlock Benches 1 through 5. The proposed workover will remove the tubing and packer and clean out fill below the lowest HB-5 perforations. A scab isolation packer assembly will be installed to isolate the HB-1 and HB-2 perfoartions which are currently thief injection zones. A plug will be placed in the tailpipe below the lowest isolation packer to block the lower Hemlock perforations. New 3-1/2" tubing with gas lift mandrels will be run. After the rig workover, the G-4 interval will be perforated and the well will be placed on production. Future Plans: After the G-4 interval has depleted (in possibly 1-2 years), the plug below the isolation assembly will be removed and the well will be converted back to an injector in the G-4 and HB-3 thru HB-5 intervals. Proposed Workover Procedure: 1. Pressure test annulus to 2350 psi. 2. Swhut-in injection. Punch holes in tubing above injection packer at 12774'. 3. Circ kill weight brine down tubing and up annulus. 4. Pressure test wellhead. 5. Install back pressure valve. ND tree. Move in rig. 6. NU BOPE, pull BPV and install 2-way check. Test BOPE with 24 hr notice given to AOGCC for witness. 7. Puli 2-way check valve. Engage tubing hanger with landing joint. 8. Pull tubing 10' and monitor well, circulate FIW down tubing and up annulus (1-1/2 well volumes) to ensure well is clear of gas. 9. POOH laying down tubing. 10. RIH with mill and drill up packer at 12774'. POOH with mill. 11. RIH and retrieve packer with spear. 12. Clean out fill below lowest perf at 13690'. 13. If necessary, set storm packer and replace wellhead. RECEIVED FEB ru~ 2000 14. RU E-line. MU lower isolation packer with plugged tailpipe. Set lower packer at 13290'. 15. RIH with upper isolation and 3-1/2" scab liner. Stab into lower packer and set upper packer at 13100'. 16. Run 3-1/2" completion with GLMs. Set completion packer with tailpipe at appx 12540'. 17. ND BOPE, install and test tree. Release rig. AOGCCprocD-6rd.doc 2/1/00 UNOCAL Dolly Varden ¥¢ell #D-6RD Rig Workover 18. Install gas lift lines and production flowline. 19. RU E-line unit. Perforate G-4 interval at 12788'-12811' with through tubing guns. 20. Begin gas lifted prodUction of G-4 interval. AOGCCprocD-6rd.doc 2/1/00 UNOCAL ) Dolly Ya~'den Platform Well D-6RD As Completed 4-24-87 RKB to TBG Head = 39' DVT @ 7592' 3,4 NO. CASING AND TUBING DETAIL SIZE WT GRADE CONN TOP BOTTOM 13-3/8" 61 0 2477' 9-5/8" 40-47 0 6652' 7" 29 N-80 Butt 0 13833' 7" DV tool at 7592' Tubing: 3-1/2" 9.2 N-80 (IPC) DSS HTC 0 12774' 3-1/2" 9.2 N-80 Butt SC 12784' 12843' I TD = 13833' MD, PBTD = 13730' Hole Angle = 14°at PBTD Max Hole Angle = 55° @ 2900' MD KOP = 800' D-6RD schematic 4-24-87.doc REVISED: 2/1/00 JEWELRY DETAIL Depth Item 1 39 2 40 3 12774 4 12774 5 12814 6 12843 4-1/2" DCB-FBB Cameron Tbg hgr w/H BPV profile, 4-1/2" 8rd top, 4-1/2" CS bottom Xover, 4-1/2" CS 12.75 pin x 3-1/2" DSS HTC pin Baker FB-1 perm packer with 10' seal bore ext, (11.62' total seal bore) (Packer set at 12760' ELM) Tubing locater with 10.1' of seal assembly 2 jts of 3-1/2" SC butt tailpipe on bottom of seal assy, stabbed through the packer and seal bore X nipple, 2.813" ID Btm of tailpipe, 3A muleshoe PERFORATION DATA TOP BTM ZONE SPF DATE COMMENTS 13148 13169 HB-1 13212 13230 HB-2 13255 13280 HB-2 13300 13320 HB-3 13400 13450 HB-4 13470 13490 HB-4 13518 13550 I-IB-4 13565 13595 HB-5 13655 13690 HB-5 Top Perf = 9633' TVD Btm perf= 10152' TVD RECEIVED O2 000 Ne~le Oil & C, as Cons. Commisslo Anchorage n DRAWN BY: TAB UNOCAL ) Dolly ¥..'den Platform Well D-6RD Proposed 2000 Workover RKB to TBG Head = 39' CASING AND TUBING DETAIL SIZE WT GRADE CONN TOP BOTTOM 13-3/8" 61 0 2477' 9-5/8" 40-47 0 6652' 7" 29 N-80 Butt 0 13833' 7" DV tool at 7592' DVT @ 7592' Tubing (Proposed): 3-1/2" 9.2 L-80 Butt AB 0 12540' 3-1/2" 9.2 L-80 Butt AB 13100' 13290' NO. JEWELRY DETAIL Depth Item 1 39' 2 500' 3 4 12470' 5 12510' 6 12540' 3-1/2" DCB-FBB Cameron Tbg hgr w/H BPV profile SSSV 3-1/2" GLMs, appx 12 at various depths Baker SAB perm packer with MOE and K-22 tbg anchor seal assy. 3-1/2" X nipple, 2.813" ID 3-1/2" tbg tail, WLEG 7 13100' 8 13290' 9 13340' 10 13370' Baker FB-2 top isolation packer Baker F-1 perm bottom isolation packer 3-1/2" X nipple, 2.813" ID, with "PX" plug in place 3-1/2" tbg tail, WLEG G-4 Proposed TOP 12788 PERFORATION DATA BTM ZONE SPF DATE COMMENTS 12811 G-4 12 13148 13169 HB-1 13212 13230 HB-2 13255 13280 HB-2 13300 13400 13470 13518 13565 13655 13320 13450 13490 13550 13595 13690 HB-3 HB-4 HB-4 HB-4 HB-5 HB-5 Proposed after Workover Isolated during Workover Isolated during Workover Isolated during Workover Btm perf = 10152' TVD TD = 13833' MD, PBTD = 13730' Hole Angle = 14°at PBTD Max Hole Angle = 55° @ 2900' MD KOP = 800' D-6RD proposed schematic.doc REVISED: 2/1/00 RECEIVED FEB 03 000 AlaA 011 & Gas Cons. Comm~lon DRAWN BY: TAB Anchorage 20' 18'-7" 16' RIG FLOOR BOTTOM ROTARY TABLE BTM RT BEAM BOTTOM TROLLEY BEAM ~ ~ PITCHER NIPPLE TO TRIP TANK I~ ~~ TO FLOW LINE ~ 116,, RISER · I I ",, HYDRIL 13-5/8" GK 5M ANNULUR PREVENTEI~ I I I CHOKE 13-5/8" SM DOUBLE GATE BOP ( TOP PIPE RAM ~ BLIND CELLAR FLOOR I DRILL DECK FLOOR RECEIVED FEB O 3 lO00 ~ u~ Alaska 011 & Gas Cons. Comml~l!m ~ ~ 3-~" x ~" Anchorage 5M CROSSOVER SPOOL ~ ..- DOLLY VARDEN PLATFORM CBBK INLET, ALASKA I SDL DOLLY VARDEN P~TFORM BLOW OUT PREVENTER D-6RD ~Am~ NO. .TS UNOCALe D-DV-015 /30/98 ~ 1 OF 1 -'O 3BG TiME Tilde *P q TYTE OF ~ REQ (~O 1BO TBO TBO ~ ANNULUS TVD CAS~;O ~ TI~T PRESS ]]SO CSO (2~O START mA~fI.L NAME ~14 'N FLUID lkfl) ,, $ ,,IZ~.dWT/GRADE SIZE PRESS PI;~ESS imRES~ ~ ~ P F ~oV e~o ~z~o ~zoo ~z~-~-- · mING INIKC'TION FLLqD: PROIR~3~D WATER ]N] SALT WATER ]NJ MISCIBLE 12~CI3ON INJEC33NO NOT UqJEC]]NO F~ DI~EL (H.YCGL SALT WATER DRilLING MUD To Mr. Bhir Wmm~zutl (276-~4~) (File 2.16.3) WELL~: lz~tiel -- 4-1n~r ~ Workovcr __ Explain: COMPANY ~ S1GNA'IIfR.E: RE(EIVED J u L 2 7 ~.992 A~&ska U~i & Gas Cons. Commission STATE OF ALASKA ALA,.'¢KA OIL AND GAS CONSERVATION COMMISSION REPORT OF-SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown ~ Stimulate __ Plugging Perforate Notice O'f Pull tubing ~ Alter casing __ Repair well m 2. Name of Operator / 5. Type of Well: UNOCAL (Marathon Oi.1 Co. Sub-OperatOr) Development X_~_Exploratory__ 3. Address ! Stratigraphic ~ P.O. Box 190247 Anchorage, AK 9951~ Service__ 4. Location of well at surface Leg B-l, Condo #2, Dolly Varden Platform 673' FSL, 1,220' FWL, Sec. 6-SN-13W-SM At top of productive interval 1,433' FEL, 2,490' FNL, Sec. 8-8N-13W-SM At effective depth 1,304' FEL, 2,589' FNL, Sec. 8-SN-13W-SH At total depth 1,275' FEL, 2,608' FNL, Sec. 8-8N-13W-SM Other~ Cancel lation 6. Datum elevation (DF or KB) 106' KB above MSL Z Unit or Property name Trading Bay Unit 8. Well number D-6RD "9. Permit number/approval number 9-026 10. APl number 5°733-20147-01 11. Field/Pool Heml oc k feet 12. Present well condition summary Total depth: measured true vertical Effective depth: measured true vertical Casing Length Structural Conductor Surface Intermediate 2,477 ' Production 6,652 ' Liner 13,833' Perforation depth: measured true vertical 13,833' feet Plugs(measured) 13,730' 10,298' feet 13,730' feet 10,191' feet Junk (measured) None Size Cemented Measured depth 13 3/8" 2,400 sx 2,477' 9 5/8" 3,000 sx 6,652' 7" 1,860 sx 13,833' See Attachment #1 - 13,833' cmt True vertical depth 2,282' 4,831' 10,298' Tubing (size. grade, and measured depth) 3 1/2", 9.2 #, N-80, DSS HTC Tbg. @ 12,843' P k rs an S (ty, a d e suredde h ~C~er ~o~e~ ~P~-~ ~alnerP~}od. Pkr.@ 12,760' w/lO' seal bore extension.RE(]~ 13. Stimulation or cement squeeze summary 14. Intervalstreated (measured) '", ~= ~'~ ~ Treatment description including volumes used and final pressure ~J~ Oil & G3S COilS, UO Representative Daily Average Production or Injection Data ~ '~ ..... ~- OiI-Bbl Gas-Md Water-Bbl Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 15. Attachments ~ 16. Status of well classification as: Copies of Logs and Surveys run __ I Daily Report of Well Operations m : Oil ~ Gas __ Suspended 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. ned Re~/15~ %` ~ ~ ~ Title ~..e.~.. '~ ~-~, Form 10-404 Service Date \o - SUBMIT IN DUPLICATE Bench 1 Bench 2 Bench 2 Bench 3 Bench 4 Bench 4 Bench 4 Bench 5 Bench 5 Attachment #1 Well D-6RD Perforations 13,148' - 13,169' MD 13,212 - 13,230' MD 13,255 - 13,280' MD 13,300 - 13,320' MD 13,400 - 13,450' MD 13,470 - 13,490' MD 13,518 - 13,550' MD 13,565 - 13,595' MD 13,655 - 13,690' MD 9,633' -9,653 TVD 9,694' -9,711 TVD 9,735' -9,759 TVD 9,777' -9,796 TVD 9,873' -9,921 TVD 9,940' -9,959 TVD 9,986' - 10,017 TVD 10,031' - 10,060 TVD 10,118' - 10,152 TVD em/32A/DVP2 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon __ Suspend __ Alter casing __ Repair well __ Change approved program __ Pull tubing __ Variance Operation shutdown __ Re-enter suspended well __ Plugging __ Time extension __ Stimulate ~ Perforate x Other 2. Name of Operator ! 5. Type of Well: UNOCAL (Marathon Oil Co. Sub-Opera,cot) De~vel?Pment__ ! r-xp~oratory 3. P.O. Box 190247 Anchorage, AK 995119 Service-~- Address _1_ Stratigraphic / 4. Location of well at surface Leg B-i, Cond. #2, Dolly Varden Platform 673' FSL, 1,220' FW'~, Sec. 6-SN-13W-SM At top of productive interval 1,433' FEL, 2,490' FNL, Sec. 8-SN-13W-SM 2,589' FNL, Sec. 8-SN-13W-SM 2,608' FNL, Sec. At effective depth 1,304' FEL, At total 13,833' 10,298 ' 12. Present well condition summary Total depth: measured true vertical Effective depth: measured 13,730 ' true vertical 10,191 ' Casing Length Structural Conductor Surface 2,477' Intermediate 6,65 2 ' Production 13,833' Liner Perforation depth: measured Size 6. Datum elevation (DF or KB) 106' KB above MSL true vertical 7. Unit or Property name Trading Bay Unit 8. Well number D-6RD 9. Permit number 82-20 10. APl number 50-- 733-20147-01 8-8N- 13W-SM feet Plugs (measured) feet J A ~',[ .1. ....~ .~ feet ~"'~i~ ~ch0~ag~'.,~.),~ Cemented Measured depth 13-3/8" 2,400 sx 2,477' 9 5/8" 3,000 sx 6,652' 7" 1,860 sx 13,833' feet ,,, 11.~ieldTPoql nem±o ctc 13,730' - 13,833' cmt True vertical depth See Attachment #1 Tubing (size, grade, and measured depth) 3 1/2", 9.2 #, N-80, DSS HTC Tbg. @ 12,843' 2,282' 4,831' 10,298' PackersandSSSV~ypeandmeasureddepth) Baker Model FB-1 Retainer Prod. Pkr.@ 12,760' w/10' seal bore extension 13. Attachment~ 2 & 3 Description summary of proposal _~ Detailed operations program __ BOP sketch 14. Estimated date for commencing operation January 1989 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: Oil __ Gas __ Suspended __ Service Water Iniection 17. I hereby certify ~at..N~e.foregging is true and correct to the best of my knowledge. Signed . ~: Rdberts ' Title Environmental Engineer FOR COMMISSION USE ONLY Approved by order of the Commission Date 1/9/89 Conditions of approval: Notify Commission so representative may witness Plug integrity __ BOP Test ~ Location clearance __ /,, z~ Mechanical Integrity Test__ Subsequent form required 10- ~ ' Approved Oopy Returned ORIGINAL SIGNED BY /_....~...,~¢_......,~.~ LONNIE C, SMITH " Commissioner I Approval No. ¢,- ~ Form 10-403 Rev 06/15/88 SUBMIT IN TRIPLICATE Bench 1 Bench 2 Bench 2 Bench 3 Bench 4 Bench 4 Bench 4 Bench 5 Bench 5 Attachment # 1 Well D-6RD Perforations 13,148' - 13,169' MD 13,212' - 13,230' MD 13,255' - 13,280' MD 13,300' - 13,320' MD 13,400' - 13,450' MD 13,470' - 13,490' MD 13,518' - 13,550' MD 13,565' - 13,595' MD 13,655' - 13,690' MD 9,633' - 9,653' TVD 9,694' - 9,711' TVD 9,735' - 9,759' TVD 9,777' - 9,796' TVD 9,873' - 9,921' TVD 9,940' - 9,959' TVD 9,986' - 10,017' TVD 10,031' - 10,060' TVD 10,118' - 10,152' TVD em/32A/DVP !;SJ~ka ~011 .& Gas Cons, Attachment #2 TBU Well D-6RD Procedure 1. RU E-line. PT to 2500 psi. me Perforate the following intervals w/2-1/8" hollow carrier guns, 4 SPF, 0° phasing. Bench Interval DIL Footage New or Reperf 13,148' - 13,169' 13,202' - 13,212' 13,212' - 13,230' 13,300' - 13,320' 13,346' - 13,386' 13,400' - 13,450' 13,454' - 13,470' 13,470' - 13,490' 13,518' - 13,550' 13,565' - 13,595' 13,655' - 13,690' 21' Reperf 10' New 18' Reperf 20' Reperf 40' New 50' Reperf 16' New 20' Reperf 32' Reperf 30' Reperf 35' Reperf 292' 3. RD E-line. Place well back on injection. 4. Run surface injectivity test. Send data to Anchorage Engineering. Note: Maximum anticipated SBHP is 3900 psi. em/32A/DVP 2 D~LLY VARDEN PLATJ=ORM ~°~=~'~ #~ Wireline Lubricator W/Associated BOPE MANUALLY OPERATED ' BOP ------ GREASE HEAD (Hydraulically Activated) ____- LUBRICATOR 4..1/',1,6'"'. '5000 psi CHISTMAS TREE ----- 2' 5000 pal 2' 3000 psi - 13 3/8' CASING Telecopy No. (907) 276-7542 October 27, 1988 D K Corlett Region Operations gng Marathon Oil Company P 0 Box 190168 Anchorage, ~ 99519 Dear Mr Corlett,~ On September 26, 1988 we received the cement bond logs on wells D-6BD, D-15 RD2, D-16~, D-24A, and D-29RD. Thank you for your prompt help. Sincerely, Blair E WondzelI Sr Petr Engineer Jo/A.BEW. 122 Alaska ~gion Domestic Production Marathon Oil Company P.O. Box 190168 Anchorage, Alaska 99519 Telephone 907/561-5311 September 23, 1988 Mr. Blair Wondzell Alaska Oil and Gas Conservation Commission 3001 Porcupine Dr. Anchorage, AK 99501 Dear Sir: Enclosed are sepia copies of the cement bond logs you requested for Dolly Varden water injection wells D-6RD, D-15RD2, D-16RD, D-24A, and D-29RD. Should you have any questions or require further assistance please contact Mr. Norm Fahnholz at (907) 561-5311. Sincerely, D. K. Corlett Region Operations Engineer NEF/em/878/OE34 A subsidiary of USX Corporation Marathon Oil Company Alas~. jistdct Prod,uction United States P.O. Box 102380 Anchorage, Alaska 99510 Telephone 907/561-5311 August 11, 1987 Mr. Blair Wondzell Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Wondzell: Pursuant to U%C regulations administered by the state of Alaska, mechanical integrity tests were successfully performed on four water injection wells during the second quarter workover program on the Dolly Varden Platform. The wells in the workover program included D-6RD, 9RD, 14RD, and 29RD. The results of the mechanical integrity test for all wells, except D-29RD, were included with the subsequent Sundry Notice on each well. This was omitted in error for Well D-29RD. A recap of the four mechanical integrity tests is as follows: The test was performed on Well D-29RD on March~, 1987. The 9-5/8", 47#, N-80 casing and 7", 29#, N-80 liner were tested to~si for 30 minutes with no detectable pressure loss. The AOGCC waived~he right to witness the test. ,~~ /~he test was performed on Well D-6RD on April 24, 1987. The 7", 29# </ N-80 casing was tested to 2,500 psi for 30 minutes with no detectable/ itness the test oss of pressure. The AOGCC waived the right to w' ~he test was performed on Well D-9RD on April 30, 1987. The 7", 29#, N-80 casing was tested to 2,300 psi for 30 minutes with no detectable loss of pressure at surface. The AOGCC witnessed this test. RECEIVED AUG 1 4 1987 Alaska Oil & i~as Cons. Commission Anchorage Mr. Blair Wondz~' August 11, 1987 Page 2 The test was performed on Well D-14RD on May 10, 1987. The 9-5/8", 40# and 43.5#, N-80 casing and 7", 29#, N-80 liner tested to 2,400 psi for 15 minutes with no detectable pressure loss. The AOGCC waived the right to witness the test. Should you have any further questions, please contact Paul Mazzolini at 564-6433. Sincerely, D. K. Corlett District Operations Engineer PEM/DKC/em/468/0E22 RECEIVED AUG 1 4 1987 Alaska Oil & Gas Cons. Canlmlsslefl Anchorage STATE OF ALASKA ~ ALAS,. , OIL AND GAS CONSERVATION COM~,..,SSION REPORT OF SUNDRY WELL OPERATIONS 1. Operations performed: Operation shutdown [] Stimulate [] Plugging [] Perforate ~ Pull tubing Alter Casing [] Other [] 2. Name of Opera~.or UNOCAL 3. Address P.O. Box 190247 Anchorage, AK 99519 4. Location of well at surfaceLeg B-i, Cond. #2, Dolly Varden Platfo~ 673' FSL, 1,220' FWL, Sec. 6-8N-13W-SM At top of productive interval 1,433' FEL, 2,490' FNL, Sec. 8-SN-13W-SM At effective depth 1,304' FEL, 2,589' FNL, Sec. 8-8N-13W-SM At total depth 1,275' FEL, 2,608' FNL, Sec. 8-8N-13W-SM 5. Datum elevation (DF or KB) 106' KB above MSL 6. Unit or Property name Trading B~y Unit m 7. Well number 8. Approval number 7-114 , 9. APl number 50-- 733-20147-01 10. Pool Hemlock 11. Present well condition summary Total depth: measured true vertical 13,833' feet Plugs (measured) 10,298' feet 13,730' - 13,833' cmt Effective depth: measured 13,730 ' feet Junk (measured) true vertical 10,191' feet Casing Length Size Cemented Structural Conductor Surface Intermediate 2,477' 13 3/8" 2,400 sx Production 6,652' 9 5/8" 3,000 sx Liner 13,833' 7" 1,860 sx Perforation depth: measured None Measured depth ~ue Verticaldepth 2,477' 2,282' 6,652' 4,831' E i V ED true vertical See Attachment #1 ~bing(size, grade and measured depth) 3 1/2", 9.2 #, DDS HTC Tbg. @ 12,843' Packers and SSSV(type and measured depth) Baker Model FB-1 Retainer Prod. Pkr.@ 12,760' MAY 2 3 1987 ~\laska 0il & Gas Cons, Commission Anchorage w/10' seal bore extension 12. Stimulation or cement squeeze summary Intervals treated (measured) Treatment description including volumes used and final pressure 13. Representative Daily Average 1~'4~t~tez~r Injection Data OiI-Bbl Gas-Mcf Water-Bbl .Casing Pressure Tubing Pressure Prior to well operation Subsequent to operation 5/10/87 5991 1 3,000 psi 14. Attachment~: #2 & 3 Daily Report of Well Operations [] Copies of Logs and Surveys Run [] 15. I hereby certify that the foregoing is true and correct to the best of my knowledge * Marathon Oil Company - Sub Operator Signed Roy D. Roberts~.~~~'/'~- Title Environmental Enqineer Form 10-404 Rev. 12-1-85 Date 5/26/87 Submit in Duplicate Feet Bench 1 Bench 2 Bench 2 Bench 3 Bench 4 Bench 4 Bench 4 Bench 5 Bench 5 Attachment #1 Well D-6RD Perforations 13,148' - 13,169' MD 13,212' - 13,230' MD 13,255' - 13,280' MD 13,300' - 13,320' MD 13,400' - 13,450' MD 13,470' - 13,490' MD 13,518' - 13,550' MD 13,565' - 13,595' MD 13,655' - 13,690' MD 9,633' - 9,653' TVD 9,694' - 9,711' TVD 9,735' - 9,759' TVD 9,777' - 9,796' TVD 9,873' - 9,921' TVD 9,940' - 9,959' TVD 9,986' - 10,017' TVD 10,031' - 10,060' TVD 10,118' - 10,152' TVD NEF/em/32A/Sundr2 RECEIVED Alaska OJJ & Oas Cons. Attachment #2 Daily Report of Well Operations Well D-CRD 4/9/87 Finished skidding Rig #76 over D-CRD. Filled tbg w/25 bbl FIW. RU wireline, run 2.9" gauge ring to changeover (4-1/2" x 3-1/2") at 7,970' WLmeasurement. Could not get deeper. RD wireline. ND X-mas tree. 4/10/87 Nippled up BOPE. Spear tubing, pull hanger loose. Center rig over hole. Presently LD tubing. 4/11/87 Finished LD 3-1/2" tbg. Test BOPE to 3,000 psi, annular to 1,500 psi, mill on packer @ 12,777'. 4/12/87 Finished milling on packer, POOH, PU spear, RIH, spear packer, POOH. PU reverse circ junk basket, RIH. Presently pumping ball to activate junk basket. 4/13/87 Worked junk basket. POOH. LD junk sub. PU PRT & mill. RIH, mill packer @ 12,800'. POOH, LD fish. PU 6" bit, junk basket. Presently RIH. 4/14/87 Finished RIH w/6" bit & junk basket. Cleaned out to 13,721'. POOH. PU 7" csg scraper. RIH. Circ hole clean. 4/15/87 Finished circulating clean FIW. POOH. PU retrievable packer. RIH to 540', test casing to 2,500 psi, OK. RIH to 12,916', pressure test ~asing to 2,500 psi, OK. POOH. RIH with TCP guns & packer. 4/16/87 Continued RIH w/TCP guns. Run GR. CCL to correlate to DIL, set packer @ 13,118'. Perforate as follows: 13,148' - 13,164' (16') 8 JSPF; 13,300' - 13,320' (20') 4 JS?F; 13,400' - 13,450' (50') 8 JSPF; 13,470' - 13,490' (20') 8 JSPF; 13,518' - 13,550' (32') 8 JSPF; 13,565' - Daily Report of Well Operations Well D-6RD 4/16/87 (continued) 13,595' (30') 4 JSPF; 13,655' - 13,690' (35') 4 JSPF. Flow well 2 hrs., no fluid to surface. Fill tubing & circulate 425 blls. POOH LD guns. PU production packer, RIH. Packer set @ 5,294'. Release from packer. POOH. Presently LD setting tool. 4/17/87 RIH w/pkr milling BHA. Tag pkr @ 5,294' DPM. Break circ. Mill pkr. Chase pkr to 14,639' DPM. POH. SLM. Repair cathead cluch. PU spear assembly. RIH to 3,000'. Slip & cut 45' of drlg line. RIH. Tag pkt @ 13,639' DPM. Work spear into pkr. POH w/pkr. 4/18/87 Finished POH w/pkr & fshg tools. RU wireline & lub. MU 4" csg guns w/4 SPF. Locate guns @ 13,153' - 13,169' DIL. Guns misfired. POH. Found wet connection. RIH w/4" csg guns. Locate & fired guns. POH. Ail shots fired. RD wireline. Pull wear ring & test BOPE. PU 6" bit & RIH for cleanout run. Tag bottom @ 13,721' DPM. CBU. POH. MU pkr & tailpipe assembly. RIH on 3-1/2" DP. 4119187 Continued RIH w/pkr & tailpipe assembly. Pkr. taking wt @ 7,120' DPM. RU & circ. Attempt to work pkr downhole w/no success. Could not pull pkr up hole. Pkr set, could not circ. Drop pkr setting ball & set pkr w/3,100 psi. POH. LD setting tool. RIH w/PRT assembly. Tag pkr @ 7,120 DPM & mill pkr. Latch pkr & CBU. POH. Hole pulled tight @ 6,800' DPM. Appeared to lose fish. Finished POH. No fish recovered. MU spear. RIH to 2,500'. Slip & cut 95' drlg line. Continued RIH. 4/2o/87 Finished RIH. Engaged fish, POOH. RIH w/6" bit & boot baskets. POOH. RIH with bit & scraper. 4/21/87 Finished RIH w/6" bit. POOH. PU pkr. RIH. Pkr preset @ 8,286'. POOH. Picked up mill & PRT. PIH. Presently milling on packer. 4/22/87 Finished milling packer, POOH. PU bit & scraper. RIH to 8,294'. POOH. Rig up wireline. RIH w/6" magnet on wireline. Magnet stopped at 2,190'. POOH. Rig down wireline. Run 6" magnet on drillpipe to 12,000'. Presently POOH. Gas Con~... Ancho:'ag~ Daily Report of Well Operations Well D-6RD (continued) 4~23~87 Finished POOH w/magnet. Recovered iron filling and several small pieces w/metal. RU wireline. Made 3 runs with a 5.937" gauge ring and junk basket to 12,900'. Made 2 runs with a 6.00" gauge ring and junk basket to 8,160'. PU permanent packer and 10' seal bore extension and RIH. Set at 12,760'. RD wireline. RIH w/dummy seal assembly. Sting into packer. Test seals and casing to 1,500 psi, 30 min. OK. Presently LD drillpipe. 4~24~87 Finished LD drillpipe. Make up seal assembly. Pick up and run 3-1/2", 9.2~, N-80, IPC tbg w/DSS-HTC connections. 4125187 Released Rig 0230 hrs. Temporarily suspended operations WO new seal flang for X-mas tree. Ran total of 414 its. of 3-1/2" tbg w/AB DSS-HTC conn. (tbg has IPC). Ail its rabbited & all conn. tested to 5,000 psi. Displace inhibited pkr fluid on backside. Sting into pkr & space out. Seals tested to 1,500 psi. Land hanger w/10,000# dn wt. Performed csg integrity test for AOGCC, 2,500 psi for 30 min. ND BOPE & Riser. Install X-mas tree & energize seals, no test. Found improper machined neck on tbg hanger. NEF/em/32A/Sundr2 Attachment #3 Trading Bay Unit Well D-6RD (Current) 477' 13-3/8", 61# 6,652' 9-5/8", 40-47# --3-1/2", 9.2~! N-80 DSS HTC Tbg. ----12,774' Baker Tbg. Locator - 3-1/2" DSS Box. 12,760' Baker Model "FB-I" Retainer Prod. Pkr. w/10' Seal Bore Extension Baker Seal assembly ,843' 3-1/2" Butt. Tbg. Cut 3/4" Mule Shoe Perforations (DIL) Bench 1 13,148' - 13,~69' Bench 2 13,212' - 13,230' Bench 2 13,255' - 13,280' Bench 3 -13,300' - 13,320' Bench 4 13,400' - 13,450' Bench 4 13,470' - 13,4.90' Bench 4 13,518' - 13,550' Bench 5 13,565' - 13,595' Bench 5 13,6pp~ - 13,690' 13,730' PBTD 13,833' TO ~EF 5/13/87 ,, · ' :"'~. STATE OF ALASKA ~ FEB 2 0:19 . ALASh..-. OIL AND GAS CONSERVATION COMrv,,.SSION "~ " APPLICATION FOR SUNDRY APPROVALSc' w. Z OCKW__ O 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter casing [] ~ Time extension [] Change approved program [] Plugging [] Stimulate [] Pull tubing :~ Amend order [] Perforate [] Other [~ I Z 2. Name of Operator 5. Datum elevation (DF or KB) I O-/, UNOCAL 106' KB above MSL feet [/~ 3. Address P.O. Box 190247 Anchorage, AK 99519 4. Location of well at surfaceLeg B-l, Cond. #2, Dolly Varden Platfor 673' FSL, 1,220' FWL, Sec. 6-dN-13W-SM At top of productive interval 1,433' FEL, 2,490' FNL, Sec. 8-dN-13W-SM At effective depth 1,304' FEL, 2,589' FNL, Sec. 8-dN-13W-SM At total depth 1,275' FEL, 2,608' FNL, Sec. 8-dN-13W-SM 11. Present well condition summary Total depth: measured true vertical 13,833' feet Plugs (measured) 10,298 ' feet Effective depth: measured 13,730' feet Junk (measured) true vertical 10,191' feet 6. Unit or Property name Tradin~ Bay Unit 7. Well number 8. Permit number 82-20 9. APl number 50-- 733-20147-01 10. Pool Hemlock 13,730' - 13,833' cmt None Casing Length Size Cemented Measured depth Structural Conductor Surface 2,477' 13 3/8" 2,477' Intermediate 6,652' 9 5/8" 6,652' Production 13,833' 7" 1,860 sx 13,833' Liner Perforation depth: measured true vertical See Attachment #1 ~bing(size, grade and measured depth) 4 1/2", 12.6 #, N-80 @ 7,956' 3 1/2", 9,2#, N-80 @ 7,956' - 12,866' Packers and SSSV(type and measured depth) Baker Model FB-1PermPkr @ 12,802' and @12,815' 12.Attachment~: 2 & 3 Description summary of proposal [] Detailed operations prog~ram [] BOP sketch [] ~'~ ~.'~ ~ !~? b¢ D Attachment #4 ~ueVerticaldepth 2,282' 4,831' 10,298' 13. Estimated date for commencing operation March 1987 ~:.~ .,~ ./~ I~";.~ 14. If proposal was verbally approved [: ~ ~' - ~""-'"": A;[~:~a C~i & g~,~q'~te approved Name of approver "~'", 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~¢. ~~ Title En~~~l ~q~ Date 2/23/87 D. ~~. Commission Use Only Conditions of approval Notify commission so representative may witness I Approval No. ~ . . ~ ?lug integrity ~ B~P Test ~ Location clearance~ /-- ~5~ * Marathon ~il Company- Sub-Operator o .. ~ ~ ,~~~~rder of ~ __ I Approved by ~ ~:~[: ~. ¢~1I~ Commissioner the commission Date Form 10-403 Rev 12-1-85 Submit in triplicate Bench 1 Bench 2 Bench 2 Bench 4 Bench 4 Bench 4 ATTACHMENT #1 Well D-6RD Perforations 13,155' - 13,169' MD 13,212' - 13,230' MD 13,255' - 13,280' MD 13,400' - 13,450' MD 13,470' - 13,490' MD 13,525' - 13,545' MD 9,640' - 9,653' TVD 9,694' - 9,711' TVD 9,735' - 9,759' TVD 9,873' - 9,921' TVD 9,940' - 9,959' TVD 9,993' - 10,012' TVD MDC/em/32/Sundr2 ATTACHMENT #2 Application for Sundry Approval Well D-6RD Workover Procedure 1. Move Rig 76 over D-6RD. 2. Kill well and NU BOPE. 3. Pull and LD tubing. 4. Fish permanent packers at 12,802' and 12,815' and clean out to PBTD at 13,724'. 5. Perforate Hemlock Benches 1 through 4 and acidize, if necessary. 6. Run packer and completion assembly. 7. Rig down and place well on injection. 8. Run injection profile. Note: BHP is 3,750 psi @ 9,450' TVD. Workover fluid will be seawater and/or KC1 brine weighted to keep the well overbalance. Sized salt kill pills will be used as necessary to prevent excessive fluid loss. em/32/Sundr2 ATTACHMENT #3 Well D-6~D (Existing) TBG Hanger - CIW "DCB" w! 4-1/2" AB Modified Buttress Bottom '-amd 4-1/2" 8rd Top. .2,477' 13 3/8", 61# 6,652' 9-5/8", 40-47# ~-1/2", 12.6# N-80 w/AB Mod. Buttress CPLGS 7,956' 4-1/2" x 3-1/2" x-over 3-1/2", 9.2# N-80 w/AB Mod. Buttress GPLGS (Proposed) TBG Hanger - CIW "DCB" w/ 4-1/2" AB Modified Buttress Bottom and 4-1/2" 8rd Top. ~ ( .2,477' 13-3/8", 61# k ~ -6,652' 9-5/8", 40-47# 3-1/2" 9.2# N-80 Tbg w/Premium connections & IPC 12,801' Baker "G" Locator 12,802' Baker "FB-I" perm. pkr. 10' Seal Bore extension · 12,815' Baker "FB-I" perm. pkr. -10' Seal Bore extension 12,866' Mule shoe Perforations (DIL). · 13,155' - 13,169' Bench 1 ' ~3,212' - 13,230' Bench 2 -. ~-----13,255' - 13,280' Bench 2 .. 4-------13,400' - 13,450' Bench 4 (-------13,470' ~----13,525' - 13,490' Bench 4 - 13,545' Bench 4 4.------43,724' Float Collar 4--------13,833' 7", 29# p· I¢ - !13,000' Permanent pkr. !13,060' Tubing tail Perforations (DIL) [3,155' - 13,169' Bench I 13,212' - 1'3,230' Bench 2 13,255' - 13,280' Bench '2 13,344' - 13,362' Bench 3 13,400' - 13,450' Bench 4. 13,470' - 13,490' Bench 4 13,525'.- 13,545' Bench 4 13,724' Float Collar 13,833' 7", 29# - MARATHON ATTACHMENT #4 Well D-6RD OIL GO.- Orillin~ ["lippl~. -- DOLL'f VARDEN PLATFORM -- U (~ydr~ t ) _J ' . ' FI"- . -, ' ~ ~CIW Swin~- Bolt Clamp Riser ~ BOP ~fack For riilin~ From Uhdey 13 urface Oasin8 To TD.-- ~ 2 F,. Spool 12"~ 3, gOO w/Flon~ea Outlets ~ ~ ' V~lves, ~eil Room ~ioor ~ 3~' Oonduc~or .~ ,. ...~ ,-.. .. : .... ... :. . ..... ~.. /-',. STATE Of ALASKA ~ ALAS.. OIL AND GAS CONSERVATION COM,, JSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon [] Suspend [] Operation Shutdown [] Re-enter suspended well [] Alter camng u Time extension [] Change approved program [] Plugging ~] Stimulate [] Pull tubing [] Amend order [] Perforate [] Other [] 5. Datum elevation (DF or KB) 106' KB above MSL 6. Unit or Property name Tradi~K Bay Unit ~n 7. Well number D-6RD ~j~3 8. Permit number 82-20 9. APl number 50-- 733-201Z~7-01 10. Pool Hemlock 2. Name of Oper~or UNOCAL 3. Address P.O. Box 190247 Anchorage, AK 99519 - 13,833' cmt feet.,, /, 4. Location of well at surfaceLeg B-l, Cond. #2, Dolly Varden Platfor 673' FSL, 1,220' FWL, Sec. 6-8N-13W-SM At top of productive interval 1,433' FEL, 2,490' FNL, Sec. 8-8N-13W-SM At effective depth 1,304' FEL, 2,589' FNL, Sec.. 8-8N-I3W-SM At total depth 1,275' FEL, 2,608' FNL, Sec. 8-8N-13W-SM 13,833' feet PlUgs (measured) 13,730' 10,298 ' feet 11. Present well condition summary Total depth: measured true vertical Effective depth: measured 13,73.0 ' feet Junk (measured) None true vertical 10,191 ' feet Casing Length Size Cemented Measured depth Structural Conductor Surface 2,477' 13 3/8" 2,477' Intermediate 6,652' 9 5/8" 6,652' Production 13,833' 7" 1,860 sx 13,833' Liner Perforation depth: measured R E C E I V E !) True Vertical depth 2,282' 4,831' 10,298' true vertical See Attachment #1 ~bing(size, grade and measured depth) 4 1/2" 12 6 # N-80 @ 7 956' , · , , 1986 Alaska 0il & Oas Cor,s. Commission 3 1/2", 9,2#, N-80 @ 7,9565nc--h°[~e, 866' Packers and SSSV (type and measured depth) Baker Model FB-1 Perm Pkr @ 12,802' and @12,815' 12.Attachment~ ~/2 & Description summary of proposal [] Detailed operations program [] BOP sketch [] 3 13. Estimated date for commencing operation December 1986 14. If proposal was verbally approved Name of approver Date approved 15. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed _,~,_~,.~.Z.~ Title Fnvi'r'nnrnP_n-I-.a] Fn~ninPP_r' Date 12/15/86 Fo~D. P,d~rts Commission Use Only Notify commission so representative may witness [] Plug integrity [] BOP Test [] Location clearance Commissioner I Approval No. ~ ,~__TZ~ by order of the commission Date Submit in triplicate Conditions of approval * Marathon Oil Company - Sub Operator A p p rove Form 10~403 Bench 1 Bench 2 Bench 2 Bench 4 Bench 4 Bench 4 ATTACHMENT #1 Well D-6RD Perforations 13,155' - 13,169' MD 13,212' - 13,230' MD 13,255' - 13,280' MD 13,400' - 13,450' MD 13,470' - 13,490' MD 13,525' - 13,545' MD 9,640' - 9,653' TVD 9,694' - 9,711' TVD 9,735' - 9,759' TVD 9,873' - 9,921' TVD 9,940' - 9,959' TVD 9,993' - 10,012' TVD MDC/em/32/Sundry RECEIVED D ~'C 1 ? 1986 Alaska Oil & Gas Corrs. c, ommisslon AnchoJ'age Attachment #2 Dolly Varden Well D-6RD Injection Procedure Marathon requests approval for variance from Rule 6 of the TBU Area Injection Order No. 5 to allow restoring injection in TBU Well D-6RD temporarily for the purpose of obtaining an injection profile log. Well D-6RD will be worked over in the upcoming Dolly Varden Platform rig program to repair known tubing leaks. Following is the proposed procedure for restoring injection in Well D-6RD: Begin water injection into D-6RD at 2,000 psi tubing pressure. Monitor casing pressure and injected volumes. me After 24 hours, increase injection pressure as necessary to obtain a flow rate that will provide acceptable injection profile logs. Continue to monitor pressures and volumes. Be Inject into D-6RD for seven days, or until pressures and rates are stable enough to provide good profile data. 4. Rig up wireline and pressure test lubricator to 4,000 psi. RIH w/spinner tools and determine injection profile in Hemlock Benches 1, 2, and 4. 6. POH and rig down wireline. Ye Hook up surface recording equipment to D-6RD wellhead and shut well in. Record surface fall-off data. 8. Leave well shut in until rig program begins. MDC/em/32/Sundr2 RECEIVED 1 ? 1986 Alaska Oil & Oas Co,'rs. oommLsslon Anchorage ATTACHMENT #3 Well D-6RD (Exis ting) . · .. TBG Hanger - CIW "DCB" w/ 4-172" AB Modified Buttress Bottom and 4-1/2" 8rd Top. Lc 2,477' 13 3/8", 61# : 6,652' 9-5/8", 40-47~ 1/2", 12.6# N-80 v/AB Mod. Buttress CPLGS · -7,956' 6-1/2" x 3-1/2" x-over 3-1/2", 9.2# N-80 v/AB Hod. Buttress GPLGS RECEIVED I ? 1986 'Ahska Oil & Gas Co,s. i;~mtaalon Anchorage 12,801' Baker "G" Locator 12,802' Baker "FB-I" perm. pkr. · 10' Seal Bore extension -12,815t Baker "FB-I" perm. pkr. · 10' Seal Bore ex:ension 12,866' Mule shoe Perforations (DIL) · ' 13,155' - 13,169' Bench I 13,212" - 13,230' Bench 2 .. ~-------13,255' - 13,280' Bench 2 ~-----13,400' - 13,450' Bench ~--------13,470' - 13,490' Bench 4 ~-----'13,525' - 13,545' Bench 4 ,~_...----X3,724' Float Collar ~13,333' 7", 29# Unocal Oil & Gas Divisio<*'~', Unocal Corporation P.O. Box 190247 Anchorage, Alaska 99519-0247 Telephone (907) 276-7600 UNOCALe Environmental Group Alaska District October 1, 1985 Hr. C.V. Chatterton Alaska Oil & Gas Conservation Commission 3001Rorcupine Drive Anchorage, Alaska 99502 Dear Hr. Chatterton: TRADING BAY UNIT D-6RD Attached for your approval are three copies of Harathon's intention to replace the tubing hanger in Well D-6RD. Rlease~return a copy,,of the approved Sundry Notice to the undersigned. Very truly yours ....... ~Candace Lockwood Environmental Group cwl Attachments ocTO A A~as~ Oi~ & Gas Co~s. Commission knchora.~,e STATE OF ALASKA ~ ALASKA 0,- AND GAS CONSERVATION CO,..MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL ~ OTHER [] Name of Operator 7. Permit No. Union Oil Company of California* 82-20 3. Address 8. APl Number P. O. Box 6247 Anchorage, AK 99502 50- 733-20147-01 4. Location of Well Surface: Leg B-l, Cond. 673' FSL, 1220' 92, Dolly Varden Platform FWL, Sec. 6-8N-13W-SM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. ' 106' KB above MSLI ADL-18729 9. Unit or Lease Name Trading Bay Unit 10. Well Number D-6RD 11. Field and Pool McArthur River Field Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well IX Change Plans [] Repairs Made Pull Tubing ~ Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). TBU WELL D-6RD It is Marathon's intention to replace the tubing hanger in Well D-6RD, beginning November 15, 1985, as follows: 1. Kill the well with FIW and NaC1-CaC1 2. ND tree, NU BOPE and test to 3000 ps~[ 3. Pick up tubing 70' and circulate kill fluid to surface. 4. Replace the corroded tubing hanger with a new, DCB 11" nominal 5000 psi tubing hanger.. 5. Re-land the tubing hanger and pressure test the tubing hanger, tubin~!~a~:::~c.er to.1500 psi. 6. Set BPV, ND BOPE;.r~..::~j~est tree, pull BPV. 7. Return the';well to in~~n. ,._., RECEIVED *Marathon Oil Company - Sub Operator ~,!,:~,~ a ~),~ ~ fi~s Cons. Commission 14. i hereby ce~~ego~)~ Signed Lare~ '0. 'C'~1~n g The space below for Commission use correct to the best of my knowledge. Title Environmental Specialist Date 10/01/85 Conditions of APproval, if any: Approved bY roved Cc~pY,, By Order of COMMISSIONER the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Tiiplicate and "Subsequent Reports" in Duplicate Union Oil and Gas Division: Western Region Union Oil Compani 'California P.O. Box 6247, AnL.,,orage, Alaska 99502 Telephone: (907) 276-7600 union October 30, 1984 Mr. Chat Chatterton AK. Oil & Gas Conservation Commission ~OO1 Porcupine Drive Anchorage, AK 99504 Dear Hr. Chatterton: Attached are Sundry Notice Subsequents on D-2A, D-6RD, D-16RD and D-4ORD for your information and file. LOC:tJ Attachment Very truly yours, Lawrence O. Cutting Environmental Technician RECEIVED NOV 0 2 ]~4 Alaska Oil & Gas Cons. CommisSion Anchorage STATE Of ALASKA ALaSt/"~OI L AND GAS CONSERVATION ~"~MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [~ 2. Name of Operator 7. Permit No. Union Oil Company of California* .R. 2-20 3. Address 8. APl Number P.O. Box 6247 Anchorage, AK 99502 so- 733-20147-01 OTHER [] 4. Location of Well Sur face: Leg B-1, Cond #2, Dolly Varden Platform 673' FSL, 1220' FWL, Sec. 6-8N-13W-SM 5.'Elevation in feet (indicate KB, DF, etc.) 106' KB above MSL 12. I 6 . Lease Designation and Serial No. ADL-18729 9. Unit or Lease Name ..mradinq Bay Unit 10. Well Number D-6RD 11. Field and Pool McArthur River Field Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF: (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) (Submit in Duplicate) · ~ Altering Casing [] [] Abandonment [] [] Other [] 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). D-6RD OPEN BENCHF~ 1 AND 2 FOR IAt.IECTION On October 10 and 11, 1984, the ~11 was ~erforated with 2-5/8" quns at the followinq intervals: Bench % 1 Bench ~2 13,155' - 13,169' DIL, 4 HPF, 0° phasinq 13,155' - 13,169' DIL, 4 HPF, 180° phasing 13,212' - 13,230' DIL, 2 HPF, 0°.Dhasin~ 13,255' - 13,280' DIL, 2 HPF, 0° phasinq Injection rate before opening. Benches 1 and 2: Injection rate after opening Benches 1 and 2: *Marathon Oil Company - Sub.Operator 2865 BWIPD ¢. 3150 psi. 4500 ~4IPD @ 3700 psi. o 2:19114 OCT Ak Environmental 6m~ Anchorage 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~__..,~ ~ TitleENVIRONMENTAL TECHNICIAN The space below for Commission use Date 10/29/84. __ Conditions of APproval, if any: Approved by . By Order of COMMISSIONER the Commission Date Form 10-403 Rev, 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 union September 21, 1984 Mr. Chat Chatterton Alaska Oil & Gas Conservation Commission 3001Rorcupine Drive Anchorage, Ak. 99502 Dear Mr. Chatterton: SUNDRY NOTICES - DOLLY VARDEN PLATFORM Attached, for your approval are Sundry Notices on Marathon operated wells D-2A, "~)~RD~;D-7RD and D-16RD. Please return the approved Sundry Notices to the undersigned. Very truly yours, Lawrence O. Cutting Environmental Technician LOC:cwl Attachment RECEIVED SEP 2 5 1984 Alaska 0il & Gas Cons. Commission Anchorage ~ STATE OF ALASKA ;"~ ALA~ ,A OIL AND GAS CONSERVATIO,, COMMISSION SUNDRY NOTICES AND REPORTS ON WEL 1. DRILLING WELL [] COMPLETED WELL ~ OTHER [] 2. Name of Operator 7. Permit No. Union Oil Company of California 82-20 3. Address 8. APl Number P. O. Box 6247 Anchorage, AK 99502 50-733-20147 4. Location of Well Surface: Leg B-l, Cond. #2, Dolly Varden Platform 673' FSL, 1220' FWL, Sec. 6-8N-13W-SM 9. Unit or Lease Name Trading Bay Unit 10. Well Number D-6RD 11. Field and Pool 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 106; KB above MSL I ADL 18729 McArthur River Field 12. Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: (Submit in Triplicate) Perforate J~ Alter Casing [-J. Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans [] Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other q 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). It is Marathon's intention to perforate the well with 2.6" guns at 4 HPF, 0© phasing, and 4 HPF, 180© phasing, at the following intervals: B-1 13,155' B-2 1'3,212' 13,255' - 13,169' DIL - 13,230' DIL - 13,280' DIL *Marathon Oil Company - Sub Operator RECEIVED SEP 2 5 1984 .Alaska Oil & Gas Cons. Commission Anchorage 14. I hereby certify that the foregoing is true and correct to the. ~es~ of my knowledge. Signed _ %J-~-Title ENVIRONMENTAL TECH. The space below for Commission use Conditions of Approval, if any: Date 9/21/84 IilI~IMA[ S.ltilEI) Approved by BT [OillllE C. S~41Tlt COMMISSIONER Approved Copy J~®turned By Order of the Commission Date Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate February 16, 1983 Union Oil Company of.California P.O. Box 6247 Anchorage, Alaska ~99502 Ret Subsequent Reports, Sundry }~oti¢es and Reports on Wells (Form 10-403 } For the following, lists of "Notice of Intention To:" Sundry ~kfcices and Report on Wells (form 10-4'03) this office does not have on record the "Subsequent Report of~" defining the action taken, on the. approved intention. Please advise this office by Subsequent Report of the disposition of the intention. ~¢e 1 1 _Union. Date TBU G- 8RD T~.U G-SRD TBU G-23RD TBU A-11L TBU F.-4 RD CPS 33-14RD EBU 1 3-8 TBU D-9 TBUS C-27 TBUS G-6 TBU D-6RD TBU G-7 TBUS G-2 TBUS G-3 F,- 1PD i0/1/8-0 10/1/80 10/1/80 10/1/80 11/6/80 2/11/81 6/1/81 618181 1'1/25/81 1/20/&2 3/18/82 4/21/82. 5/24/82 6/30/E2 7/14/82 Brief DescriPtion of Intention Reperforate ¢-3, C-4 Reperforate B-l, B-2, B-4 Repurforate B-5, B-l, B-4 Reperforate Reperforate Perforate B zone Clean out, reperforate. Plug & abandon for sidetrack Pull tubing, roperforate Squeeze cement to abandon hemlock Change kickoff point Reperforate Revise setting abandonment retainer Repair casing Perforate LCS/JKT/g lh ~ ......~,~,~ STATE OF ALASKA ALASKA( :AND GAS CONSERVATION CO MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS · Drilling well ~ Redrill Workover operation [] 2. Name of operator Union Oil Company of California* 3. Address Post Office Box 6247, Anchorage AK 99502 4. Location of Well at surface Dolly Varden Platform 673'FSL, 1220'FWL, Sec 6-8N-13W-SM 5. Elevation in feet (indicate KB, DF, etc;) 6. Lease Designation and Serial No. 106'gR Ah~v~ MST, ADL-18729 For the Month of JUNE 7. Permit No. 82-20 8. APl Number 50- 733-20147-01 9. Unit or Lease Name Trading Bay Unit 10. Well No. D-6RD 11. Field and Pool McArthur River ,19 82 '12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13,838'TD; 0rfootage drld RU over D-6RD on 06-20-82 to repair tbg leak. Completed repairs & released rig on 06-23-82. 13. Casing or liner run and quantities of cement, results of pressura tests 14. Coring resume and brief description 15. Logs run and depth where run .1 6. DST data, perforating data, shows of H2S, miscellaneous data 17. I hereby certify that the foregoing is true and correct to the best of my knowledge· JUL 9 A!aska Oil & Gas Cons, ..... NOTE--RepOrt On this form is required for ea~'~ calendar month, regardless of the status of operations, Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10-404 *U~e.h~n C)i ~ Com~anv - Sub-Ooerator Anchorape and must be filed in duplicate with the Alaska Submit in duplicate ~ STATE OF ALASKA ,~ ' \ /~ ALASKA ~. AND GAS CONSERVATION CON;. ~SSlON ~'~/'~'/:~;;~ WELL COMPLETION OR RECOMPLETION REPORT AND LoG Classification of Service Well ~1. Status of Well OIL [] GAS [] SUSPENDED [] ABANDONED [] SERVICE]~ Water Injection ~2. Name of Operator 7. Permit Number Union Oil Company of California* 82-20 3. Address 8. APl Number : P. O. Box 6247, Anchorage, Alaska 99502 50- 733-20147 - 4. Location of well at surface Leg B-l, Cond #2, Dolly Varden Platform 9. Unit or Lease Name 673' FSL, 1220' FWL, Sec 6, TBN, R13W, SM '~ Trading Bay Unit At Top Producing Interval 10. Well Number ~ VERIFIED i433' FEL, 2490' FNL, Sec 8, TS.N, R13W, SM Surf.~] D-6RD At Total Depth j II. ~J 11. Field and Pool H. · i275~ FEL, 2608' FNL, Sec 8, TBN, R13W, SM ..... 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. I~06' KB above MStI ADL 18729 McArthur River Field 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband, I 15. Water Depth, if offshore 116. No. of Completions 3/19/82 4/19/82 5/10/82J 90 feet MStI 1 17. Total Depth (MD+TVD) 18. Plug Back Depth (ME~TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 13838'MD 10298'TVI 13730'MD 10191'T~'NEs~X NODI ------ feetMD ----- 22. Type Electric or Other Logs Run Injectivity profile, DIL/Sonic/Caliper/GR, FDC/CNL/GR, CBL/GR/CCL 23. CASING, LINER AND CEMENTING RECORD · SETTING DEPTH MD CASING SIZE WT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED . , . 7" 29# N-80 Surface 13,833' 8-1/2" 1860 sx , 24. Perforations open to Production (MD+TVD of Top andBottom and 25. TUBING RECORD interval, size and number). Hemlock Bench-4 SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" 7910' ~ 3-1/2" x 4-1/2" x-o Top .. Btm ..-,3-1/2" 12,856' MD 12,815' MD f~3,400'MD (9873'TVD) 12;,456'MD (9921'T~D) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. 13,470'MD. (9940'TVD) 13,:490'MD (9959'TVD) DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 13,525® (9993'TVD) 13,545'MD (10,012'TVD) 13,400"'13,545' 2000 gal, 7-1/2% HC1 4000 gal, 12-6 HF w/ 300 lb · ,.- . . Benzoic flake diver~er- Perfd ~w/. Geo-Vann 4" gun, 4,HPF ... . -. _. ~, . . ,. - - , . - .~ ; . ~ · . . 27. PRODUCTION TEST ' Date Firstt' Production ' "'": I Method of O.peration (Flowing, gas lift, etc,) N.A.I N.A .... Date of Test Hours Tested PRODUCTION FOR OIL~BBL GAS-MCF WATER-BBL CHOKESIZE IGAS-OILRATIO ; . - . ~EST.PERIOD I~ .., . ~ I ,' ' TO|.L-BBL GAS-MCF WATER-BBL Flow Tubi6g Casing Pressure · CALCUL,ATED OIL GRAVITY-APl (corr) · Press. ' . ; ' - , . ". 24-HOUB-.BATE _, . . 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. · . .. .. , R£¢£1VED " ' ?" ' "-" """ " ' ~:" Alaska Oil& Gas Cons. C°mrnissiort · Marathon Oil Company'- Sub-Operator ": " Anchorage Ter Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. 30. GEOLOGIC MARKERS FORMATION TESTS NAME Include interval tested, pressure data, all fluids recovered and gravity, MEAS. DEPTH TRUE VERT. DEPTH GOR, and time of each phase. __ 31. LIST OF ATTACHMENTS ~/e]_]_ ~Z.tsl:oz:¥, Cas±n§ and Tub±ns; Der_a±]_s, D±rect.±onal Suz:¥e¥ 32. I hereby/d~ify il)hat the foregoing is true and correct to the best of my knowledge S ' ' itle ~ ~1~0 ~" Date INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and Io¢ on all types of lands and leases in Alaska. Item 1' Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23' Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27' Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water WELL HISTORY - TBU WELL D-6RD (Marathon AFE 4829) 15,510'TD FIRST REPORT Moving eqpmt from rig 77 to 76. RU 15,440'PBTD to redrill Well D-6. 15,510'TD Cont RU drlg eqpmt. Bullheaded 240 bbls 9.4 ppg mud 15,440'PBTD dwn tbg--did not kill tbg. Mixed mud to 10.5 ppg. RU WL. Could not get below 4-1/2" x 3-1/2" tbg XO w/ 2-1/8" perf gun. RIH w/ 1-11/16" gun--could not get below 10,900'. POH. RIH w/ 2-1/8" gun & perfd 4-1/2" tbg @ 10,153'. RD WL. 15,510'TD RU & circ dwn tbg & displ FIW from annls thru tbg 15,440'PBTD perfs @ 10,153'WLM. Circ & incr MW to 10.3 ppg--did not kill well. Circ & incr MW to 10.7 ppg. Well dead. Set BPV & ND Xmas tree. NU BOPE. 15,510'TD NU & tstd BopE. Pulled tbg hgr free w/ only 70,000# 15,440'PBTD wt. Circ. POH & LD 131 jts 4-1/2" tbg (4949'). This is the depth that profile log showed hole in tbg. Confirmed washed out hole in pin-end of tbg recovered. RIH w/ OS PU DP. Latched tbg fish @ 5002'DPM @ 0700 hrs. 15,510'TD Could not move tbg string out of pkr. Released OS & l'5,440'PBTD POH. LD jars & bumper sub (small ID). RIH & engaged tbg fish @ 4979'. RU WL. RIH & cut tbg @ 10,280'WLM. Worked tbg to 300,000#--came free--POH. kD 159 j ts 4-1/2" tbg & 3-1/2 j ts of 3-1/2" tbg (clean cut--fill in annls). MU 6" bit & RIH PU DP. 15,510'TD Fin RIH w/ 6" bit & PU 5" DP. Tagged top of 3-1/2" 15,440'PBTD tbg fish 'inside 7" lnr @ 10,296'DPM. C&C mud. Rec lots of coal (suspect hole in 9-5/8" csg @ + 7200'). POH w/ 6" bit--no tight spots. RIH w/ 8-1/~" bit & 6 - 6-1/4" DC's. Tight @ 7094'--took 300,000# to pull free. C&C mud for WL surv. 15,510'TD Fin cond mud. POH w/ 8-1/2" bit. Ran gyro surv on 5,440'PBTD well from surf to 10,200'WLM. Tstd BOPE. WO min ID csg caliper tool to surv 9-5/8" csg. .5,510'TD WO min ID caliper tool (weather). RU & RIH w/ 5,440'PBTD caliper tool on WL. Had problem getting from 5000'-7500', Logged 9-5/8" csg from 10,180' to surf. Log showed several areas of ID reduction from 6950'-7332'. RD WL. RIH w/ 7-1/2" OD csg swedge to 7100'. CBU. Worked thru & swedged tight spots in 9-5/8" csg from 7192'-7214'. MAY 2 ? 1982 Alaska Oil & Gas Cons. Commission Anchorage Well History - TBU Well D-6RD Page 2 03-10 03-11 03-12 03-13 03-14 03-15 03-16 03-17 03-18 03-19 03-20 03-21 15,510'TD Worked 7-1/2" csg swedge 7192'-7339' in 9-5/8" csg. 9,550'PBTD RIH to 10,236'. POH. RIH w/ 7" EZSV rtnr & set @ 10,270'DPM. Estab inj into Hemlock w/ wtr @ 1-1/2 BPM, 3000#. Spotted 265 sx C1 G @ rtnr & stung in. Could not pump w/ 4500#. POH to 9550' & rev 125 sx cmt. POH. MU 9-5/8" csg scrpr & RIH. 15,510'TD RIH w/ bit & scrpr to 6900'. Circ & POH. Ran csg 6,850'PBTD insp/caliper log. Some bad spots in 9-5/8" csg above 6900'. RIH & set 9-5/8" rtnr (BP) @ 6850'DPM. Ran CBL across proposed KO interval. MU section mill. 15,510'TD RIH w/ 9-5/8" section mill. Cut section in 9-5/8" 6,850'PBTD csg from 6652'-6668'. CBU. POH w/ mill #1. RIH w/ mill 92. Could not get to 6668'. POH. 15,510'TD POH w/ section mill. RIH w/ bit & tagged @ 6440'. 6,850'PBTD CO to 6850' (BP). Plugged bit. POH--bit plugged w/ cmt, not csg shavings. RIH w/ section mill--could not get below 6573'. POH. RIH w/ bit. Washed, rotated, & pushed trash to 6775'. Circ hole clean. Rec very few csg shavings. 15,510'TD Cond mud & POH w/ 8-1/2" bit. MU section mill 92 & 6,850'PBTD RIH. Reamed 6652'-6668' & began cutting w/ mill #2 @ 6668'. Milled section 6668'-6694' (total section cut to date: 6652'-6694'=42'). 15,510'TD Fin milling section in 9-5/8" csg to 6711'. Total 6,850'PBTD section 6652'-6711' (59'). Circ to clean hole. POH. RIH w/ bit & circ to CO csg shavings to 6835'. POH w/ bit. Began RIH w/ OEDP to spot KO plug. 15,510'TD RIH w/ OEDP to 6837'. Thinned back hi visc mud. 6,476'PBTD Mixed & spotted 132 sx cmt across section. POH & rev out @ 6476'--rec contam mud. POH. Held 800# on cmt while WOC. Making rig repairs & maint while WOC. 15,510'TD Tstd BOPE while WOC. RIH w/ bit to 6712' (btm of 6,745'PBTD section). Drld hard cmt in 9-5/8" stub from 6712'-6745'. C&C mud for 2hd KO plug. POH. LD 54 j ts 5" G. RIH w/ OEDP. LD 50 j ts 5" G. RIH to ~6745'. C&C mud. 6,662'TD C&C mud while WO cmtg crew (weather). Mixed & spotted 104 sx cmt across section from 6745'. Pulled 4 stds & rev circ. Rec only heavy mud. POH w/ 5 stds. Shut BOP & held 500# on plug 8-1/2 hrs. POH. RIH w/ 8-1/2" bit & drld cmt 6511'-6662'. Circ @ 6662 ' KOP. 6,713'TD Fin circ after dressing plug. POH. RIH w/ DD #1. Oriented @ 6662' & drld to 6713' to sidetrack hole. POH w/ DD. MU BHA. RIH. C&C mud. 6,817'TD C&C mud. Ran leakoff test on 9-5/8" shoe. Reamed thru DD 91 run & drld 6713'-6764'. POH. RIH w/ DD #2. RU steering tool on WL & oriented tool for left turn. DD 6764'-6814'. POH w/ DD #2. MU BHA & RIH. 7,140'TD Fin RIH w/ bit #4. Reamed thru DD #2 run. Drld 6817'-6893'. Circ & POH. MU BHA. RIH & reamed to 6893'. Drld 6893'-7140'. RECEIVED MAY:2, ? 1982 Alaska Oil & Gas Cons. Commission Anchorage Well History- TBU Well D-6RD Page 3 03-22 7,215'TD 03-23 7,445'TD 03-24 7,690'TD 03-25 7,849'TD 03-26 8,050'TD 03-27 03-28 03-29 03-30 03-31 04-01 04-02 04-03 04-04 0.4-05 04-06 04-07 04-08 04-09 04-10 04-11 04-12 Drld 7140 '-716-0'. Surv on WL. Drld 7160 '-7215'. Dropped surv. POH. MU new bit. Dropped 16' of chain in hole while running DC's. Fished out chain. RIH. Had 38' of fill & gas cut mud off btm. C&C mud to 10.8 ppg & washed to btm. Circ & incr MW to 10.9 ppg to control hole slough. Drld 7215 '-7240'. POH. MU BHA & RIH--hole OK. Drld 7240'-7445' w/ surv @ 7423'. Drld 7445'-7621'. Circ, surv, & POH. Tstd BOPE. RIH w/ bit #8. Drld 7621'-7690'. Drld 7690'-7771'. Circ & dropped surv. POH w/ bit #8. RIH w/ DD #3 & oriented for left turn & angle drop. DD 7771 '-7849'. POH w/ DD. Fin POH w/ DD. (7771'-7849'). Surv no good. RIH w/ bit 910 & reamed thru DD run Drld 7849'-8007'. Circ, surv, & POH. RIH w/ bit #11 & drld 8007'-8050'. 8,345'TD Drld & surv 8050'-8345' w/ bit trip @ 8225'. 8,578 ' TD 8,979 'TD Drld 8345'-8578'. Circ & surv @ 0700 hrs. Surv on WL. Drld 8578'-8979' w/ wiper trip @ 8838'. Circ, surv, & POH w/ bit #12. '9,079'TD POH. Tstd BOPE. RIH w/ bit 96RR (Polycrystaline Diamond). Hole OK--20' of fill. Drld 8979'-9079' · Circ & surv @ 0700 hrs. 9,386'TD 9,487'TD POH w/ bit 96RR. RIH w/ bit #13 & drld 9079'-9386'. Drld 9386'-9425'. Circ & surv on WL. Drld 9425'- 9457'. POH--hole OK. RIH. Drld 9457'-9487'. 9,887'TD Drld & surv 9487'-9887'. Making 10-etd wiper trip @ 0700 hrs. 10,212'TD Fin RIH after wiper trip--hole OK. Drld 9887'- 10,212'. Circ, surv, & POH. 10,480'TD 10,966'TD POH w/ bit #14. RIH--hole OK. Drld 10,212'-10,480'. Drld 10,480'-10,966' w/ surv @ 10,750' on WL. Circ, surv, & POH. 11,125 'TD POH w/ bit #15. RIH. Hole OK--no fill. Drld 10,966'-11,125' . 11,156 'TD 11,375'TD Drld 11,125'-11,156'. Surv & POH w/ bit 916. set RBP @ 928'. ND BOPE & removed tbg spool. csg spool & NU BOPE. RIH & Instld Fin NU BOPE & tstd. Retr BP from 928'. bit 917. Hole OK. Drld 11,156'-11,370'. surv on WL. Drld 11,370'-11,375'. POH. RIH w/ Circ & 11,862'TD Drld 11,375'-11,862'. 12,179'TD Drld 11,862'-11,907'. Circ & surv. POH w/ bit ~17-- hole OK. RIH & drld 11,907'-12,179'. 12,443'TD Drld 12,179'-12,443'. 12~~'~. ~ Circ, surv, & POH w/ bit ~18. ~%~'' #19. Tagged bridge @ 12,140'. 12,443'-12,585' . G~s Co~s. comm'~ss~on Hole OK. RIH w/ bit Worked thru OK. Drld Well History- TBU Well D-6RD Page 4 04-13 12,881'TD 04-14 12,981'TD 04-15 13,171'TD 04-16 13,448'TD 04-17 13,703' TD 04-18 13,810'TD 04-19 13,838'TD 04-20 13,838'TD 04-21 13,838'TD 04-22 13,838 'TD 04-23 13,838'TD 04-24 13,838'TD 04-25 13,838'TD 04-26 13,838'TD 04-27 13,838'TD 04-28 13,838'TD 04-29 13,838'TD 04-30 13,838'TD Drld 12,585'-12,881'. Dropped surv & POH w/ bit 919. Hole OK. Tstd BOPE. MU BHA & RIH. Drld 12,881'-12,981'. Drld 12,981'-13,171' w/ no hole problems. Drld 13,'171'-13,448'. Circ, dropped surv, & POH w/ bit 920. Fin POH w/ bit 920. MU BHA & RIH w/ bit ~21--hole OK. Drld 13,448'-13,703'. Circ prior to making wiper trip. Circ. Made 15-std wiper trip--hole OK. Drld 13,703' to 13,711'. Surv & POH w/ bit 921. RIH & drld 13,711'-13,810 ' . Drld 13,810'-13,838'. Circ & made 20-std wiper trip. Hole OK. Circ & surv. POH. RU to run open hole logs. RIH w/ DIL, but could not get below 6915'WLM. POH. MU DIL & Sonic/Caliper tools in tandem. RIH & got to 13,826'. Logged hole OK. Presently running FDC/CNL. Fin running FDC/CNL log from 13,826'. RIH to 13,838' w/ bit--hole in good cond. Circ & POH to run 7" csg. POH w/ DP RU & ran 336 j ts 7" 29~ N-80 csg to 13,833' C&C mud for cmt job Mixed & pumped 1250 ' ' sx C1 G for 1st stage of cmt job Displ w/ drlg ' mud. Cont displ 1st stage cmt. Press incr to 4000# w/ 334j bbls. Mud displ (total 510 bbls required to displ). CIP @ 0715 hrs. Dropped bomb & opened stage tool @ 7592'. Circ & cmtd 2nd stage w/ 600 sx. CIP @ 1300 hrs, 04-21-82. PU BOPE & set slips. Cut off csg. NU & tstd BOPE. LD 5" DP. Fin LD 5" DP, HWDP, & DC's. MU 6" bit, 4-3/4" DC's & RIH on 3-1/2" DP. PU 3-1/2" DP. Cont PU 3-1/2" DP & RIH. Tagged cmt @ 7571'. Drld c. mt & stage clr @ 7592'. Tstd clr to 2500#--0K. Cont PU 3-1/2" DP & RIH. Tagged cmt @ 8806'. Drld cmt to 9012'. Tripped for new bit. Drld cmt 9012'-9243' . Drld Cmt 9243'-9381'. Circ & POH. RIH w/ bit #25 & drld cmt 9381'-9750'. Drld cmt 9750 '-9990'. CBU. POH. RIH w/ bladed junk mill. Drld cmt 9990'-10,490'. Drld @ 47 FPH. Drld cm't 10,490'-11,953'. Drlg @ 55 to 60 FPH. Drld cmt 11,953'-12,959'. Pump press built up above normal. Could not clear drill string. POH. POH w/ bladed junk mill. RIH w/ bit--reamed 12,896'-12,959'. Drld cmt 12,959'-13,730'. Circ hole clean & POH. Fin POH w/ bit. RU WL & ran CBL/GR/CCL log. Presently running gyro on WL. MAY ? Oil & Gan/':nn~ r, Well History- TBU Well D-6RD Page 5 05-01 05-02 05-03 05-04 05-05 05-06 05-07 0'5-08 05-09 05-10 13,838'TD Fin running gyro (2 runs). Tstd BOPE. RIH w/ 6" bit 13,730'PBTD & 7" csg scrpr to 13,730'. Circ to clean hole. POH. RU WL & RIH w/ perf gun. 13,838'TD RIH & perfd for sqz between Benches 3 & 4 from 13,730'PBTD 13,381'-382'. RD WL. RIH w/ retr pkr. Spotted 20 bbls fresh wtr & displ w/ FIW. Set pkr @ 13,302'. Unable t° break dwn sqz perfs w/ 6000~. Would leak off to 3000~ in 18 min. Unseated pkr & RIH to PBTD 13,730'. Rev circ & displ mud from well w/ FIW. POH w/ pkr. MU Geo-Vann guns. 13,838'TD MU 4" Vann perf guns below retr test pkr. RIH & 13,730'PBTD located guns w/ GR tool. Set pkr @ 13,254'. Dropped firing bar & perfd Hemlock Bench 4 13,400'-450'; 13,470'-490'; & 13,525'-545'DIL. Backflowed to clean perfs.. Opened APR vlv & rev circ to clear inj string. Estab inj rate. 13,838'TD Attempted to inj into Bench 4 perfs but could not 13,730'PBTD estab rate. RU pumping unit--could not inj w/ 45009. Tool having problems. Released pkr & estab rate dwn annls @ 1/4 BPM @ 30009. SI well & checked for flow. Incr wt of FIW w/ salt. Circ & killed well. POH w/ pkr & expended Vann guns. All guns fired OK. No plug in tool string. RIH w/ retr pkr & tail pipe to 13,730 ' PBTD. CBU. 13,838'TD Set retr pkr @ 13,334'. Inj FIW into Bench 4 perfs @ 13,730'PBTD 1/2 BPM @ 4000 psi. WO acid & eqpmt. Opened pkr bypass & spotted acid @ pkr. Closed bypass. Acidized perfs w/ total 6000 gals acid in 5 stages (1 stage w/ diverter). RU WI lines & began inj into Bench 4 perfs @ 0410 hrs. Present rate is 2600 BPD @ 4000#. 13,838'TD Estab stable inj rate into Bench 4 perfs @ 3450 BPD @ 13,730'PBTD 4000#. RU WL. RIH & ran injectivity profile & temp surv. RD WL. Rec pkr & rev circ FIW out of DP. Killed well w/ 9.2 ppg salt wtr. POH w/ DP & pkr. RU WL. 13,838'TD RIH w/ WL GR & JB to 13,000'. Ran & set perm pkr @ 13,730'PBTD 12,800'. RIH w/ 3-1/2" DP. POH & LD DP. MU seal assy & presently running inj tbg strings. 13,838'TD' ~in RIH w/ 3-1/2" & 4-1/2" AB modified tbg. 13,730'PBTD Hydrotstd to 50009. Stabbed into pkr & RU to test seal assy. 13,838'TD Spaced out & displ pkr fluid into annls. Landed tbg 13,730'PBTD & tstd seal assy in pkr--OK. ND BOPE & NU tree. RU WI lines & began inj wtr @ 2530 BPD. Rig released @ 2400 hrs, 05-08-82. Moving rig to well D-4. 13,838'TD Inj FIW @ aver rate of 2396 BPD into Hemlock Bench 4 13,730' PBTD perfs. FINAL REPORT Alaska Oil & Gas Cons. CoiTlrnissjoa' Anchorag9 ~?~i~: , ..TUBI,NG./'C,ASI, N(~ DETAIL ..o WELL NO.: D -'~ DATE: ~,. BY: I Descr' t '" ' Set I I.F--.lll I./[;;)t..I I ~-/I. 1~./11 ,' . . ~ ts S i ze ~t Thread Grade Range Cond i t i on .. L~~ From To . K ~ ~ ~ ~ [ 7" ,.~,~ ~ .~b ~&.~- o ...~, ~ _ .. ~ 7" Zq ~v~ L~-~o '- 7~.'6 0 - ~,~ - .7~ ~, . . , 2 7" 29 6~~ ~-Bo 8~o ~37 W~-.70 }3 6~er 710~ 3Lo~ ,__L'83 13~31. Z0 ,13933.03 ~ ',,, , , ..... i C~m~nF ' ' . . . I ~ -- i ~ I . . . ..... R CEiV .u . 5~ i2o o~ ~ nn Cz5 $ t, p3~ " " . " ' MAY 2 ? ,1982 Remarks: . 6o from 1 o ~,'7' ,.3 .~ ~ ~ I~.~ f ~ - Alaska Oil & Gas Gons. Goi'nmission -, Anchorag.~ TUB I.N.G/'C.A5 I.N(} DETAIL. WELL NO.:'b -~''~'J'~ DATE: ~.../~ - ~ ~ BY: h'j', (-', N~,.ir,,l Item Descri tion Set Jts Size Wt Thread' Gra,,de Range Condition Length From To I I ~ t ,, , ,, -. , , , . 1 'i ,._ ,. . ,, ,,, MAY ~ ?: i982 ,, Gas Cons. commissio~ PAGE 'DATE'OF SuRvEy. APRIL 29, 1982 VERTICAL SECTION DIRECTION ARATHON.OIb COMPANY -GRO (SEC29 TOgN R13W) RADING BAY UNIT LASKA OSS SURWEL EASURED DEPTH NL SPERRY-SUN INC .. COURSE ' REC'ORDcouRsEOF'"'S[jRVE'~;'.,DO6_LEG ' '.' INCLINATION DIRr'CTION SEV RECTANGULAR COORDI'~AT'--S BOSS-16012 VERTICAL. SEA DEPTH TVD DEG MIN DEG MIN ..... D'E G/1'0 O' NORTH/SOUTH VERTICAL " ~, 0,00 lO0.O0 200.00 300.00 .... 4~.d.O--,..Ob 0,00 -106,00. ORIGIN AT SUR 100,00 · -6,00 0 4 S 34 200.00~.~ .!: 9A.O0 0 8 N 6R . 300,00 ·.194,00 0 12 N 72 400,00-- 29'~'~"'00 ........ 0 20 ...... S 65 FACE 1~. W .13:. 42 W ,07 6 E ....... 0.00 N .02..N. '::, 03:."S ' '. ,06 N .$8'S 0.00 E 0.00 · 05 W -.05 · 21 U -,18 · ~+8 w' -.AT · (-,"5 ..... ;I ............... ' .... =';" 45 ........... 500.00 600.00 700.00 BO0.O0. 900,00 soo.oo sgA.oo o 599.99 ,. Ag~'~9 ........... 0 699 99:::::.;":.~.!:. :'.5 93 · 99 0 799.97:.:.i..' :. 69.~.97 1 -- 899.85--79~";'85 ................. q 2'0 S 2 2/+ ...... S 30 42 S 1 38 S 30 I S 72 42 W .3R ,88 S .3q W 12 E ,22 1,49 S ,19 W iR E .40 .L.i..2.42.. S :::. ':~].~.. ...' ,07. E .. 4R E 1'09 ~.38":'S :'. "" · . ..~ .6A E, '" 18 "E .......... 3".0 0 ...... ' 7'~-~ .O3 1.01 2.29 TJO 5 1000.00 999,q3 1100,00 1098,57 1200,00 1197,21: 1300,00 1294,96 lZl. O0, O0 1391,19 893,fl3 6 24 .592.57 8 AO 1091.21 10 17 1188,96 lq 3 128'5'~'i'9" ' 17 32 N 89 O E 2.R9 8.77 S S 86 30"'E .......... 2.3'3 --~;[6~:S' S 78 48 E 2.05 11,16 S S 77 30 E 3.78 15,~9 'S S-' 76 ~g' E ........... 3'50 ~I";'~--S 15,A9 E 42,91 E 63,53 E 15.Rz+ 2'~.-0'2 43.87 64,55 1500,00 lq8.5,81 1600,00 1578,77 1700,00 1669,81 1800,00 1758,71 1900,00 18~5,16 1379.81 20 13 1563,81 25 50 1652.71 28 ~+0 1739"1~ ~1 41 S 76 36 E 2.68 28.99 S S' 76"30 '"E ...... 2",~2" ~7.56 S S 76 30 E 2.79 /,t-7.22 S S 76 12 E 2.8~ 58.02 S -' S 76 36 E ......3;03 .... ~9,-"~Zi:--S' 121,56 E 123.25 197.63 E 200,Al 242.13 E 245.60 .~,, 2g 0-;'99'~E'-- 2 2000.00 1928.66 1822.66 2100,00 2008,93 190"2-~9'3-" 2200.00 2085,82 ... 1979.82 2300.00 ' 2159.55 . 2053.55 2~o0.00 22;50.28 :~i-24'28 35 A S 76 54 E 3.38 82.~5 S .... 38 .... 9 .........S 77- O' E ......... 3" 08 :)5'-. 92"-$ 41 20 S 76 54 E 3.19 110,36 S 43 40 S 77 6 E 2.32 125.55 S ' 46 18 .... S'-76-12 -E ..... 2,72 ............ --~1',8'7-S 402,"6"~ E 5.30,75 E 5'~'~' S-E 349.AA 40~.20 471.19 537,73 bOT;'q3 2500,00 26 ~-~, O0 2700.00 2800.00 "2-9bo. oo 2297.91 2191.91 48 36 2'~ 6--~i' · 31 225'5.-;"3 i ............ 52 42-- 2A20,~0 2314,40 54 52 . 2q78.21 2372,21 5~ 31 2 b 3 ~'~-~-9- .... 2'429.89 ...... 55 ..... 2 ' S 76 6 E 2.30 159.51 S :S 7G-'-6 'E .........4';i0 S 75 36 E 2.20 197,81 S S 75 48 E ,39 217.96'S 671.06 E 824,35 E 903,42 E ~'82JS'B--E 680.18 7'5~';-'55 .... 8~6.28 916.96 ~97;'72'--"--'-- ARATHON O-Ii~'COM-P-~¥' -GRD (SEC29 TO~N R13W) RADING BAY UNIT ['ASEA ........... OSS SURWEL TRUE SUB COURS EASURED VERTICAL SEA INCLINA "DE'PTH DEPTH T'VD ..... DEG M DATE OF.. SURVEY APRIL 29, 19~2 VKRTICAL~SECTION DIRECTION BOSS-16012 NL SPERRY-SUN INC 'RECORD' OF SURVEY K COURSE DOG-LEG TOTAL TION DIRECTION SEV RECTANGULAR COORDINATES VERTIC'/~L IN DEG MIN DEG/IO0 ..... NORTHT"SO'LTTR-- E'~S'T/WE'ST .......... SECT ION 3000.00 2593.75 2487.75 54 1 3200.00 2710.73 2604.73 53 4 3500.00 2769.87 2663.87 53 ~ '3~O0';-0-0~'K2'9';'.2"B''-~ 272T;28 55 2 5 S 75 0 E .93 258,8~ S 3 ................. S .... 75'I2'K ....... .'21 9 S 74 ~8 E .66 300.68 S 0 S 75 O E .21 ~21.69 S 1061,47 E 1078.~4 1218.20 E .. 1259,09 1295.05 K 1318.97 3500.00 2888,75 2782.75 ~ g'd-O-;"O-O ....... 29 ~ 8 · 7-2-~L~ 4-2-;"?2 3700.00 5009.47'.- "-'-:.2903,47 ~800.00 3070.62 2964.62 -39 '00; ~ O' --$'I-3' I-;'8-1------3-02 5; 8'1 53 35 S 7~ 18 E .28 36~.33 S 52 43 ........ S--73'-30-E .... 1.07 52 28 S 73 6 E .~1 ~09.35 S 52 8 S 72 42 E .~5 4~2.62 S 52 2'5 S 72 1~51.13 E 1678.~2 1'528~"'0'1-T' ........ I'5'57';8'7 ...... 1604.09 E 1656,85 1679,72 E 1715.55 qO00.O0 3193.26 3087,26 ,, 51 ~6 -'N1"0'0~'0'0-----~'5'5-;':4: :"3'I-~-9',3~ ........ 51 29 4200.00 3317.~8 3211.38 51 49 4300.00 3379,52: 3273.52 51 20 "~4-00-;0-0--~-3~7~1---'~-5~5,91" 51 28 4500.00 3504.18 3398.18 51 31 -'~%-0-0~.-0-0~3-5-6-g.--53 --- :-3-¥E'0.'53 51 ' 2'1 4700.00 3628.74 '5522.74 51 q3 . 4800.00 3690.70 3584.70 51 ~3 -~'9~0%-00'--~~'I~ ..... 36%-8.14 '" 49 32 S 72 2~ S 72 12 S 72 30 S 73 12 S'72 48 S 75 0 'S '"72'-42 S 72 18 S 72 1~ S 70 50 E .72 479.66 S E ..... .31 ............... 5"0'3';'50--~ E .ql 527.28 S E .73 550.38 S 'E" .33 ............... ~73';~3--$' 1830.54 E 1872.78 1~g:'~2'2'-K .......... 1-9'50;"85 1979.96 r 2028.75 2054.82 E 2106.89 --2"1~9'~56--E .............. 218'~;'6~ .... E .16 596.24 S 2204.35 E 2262.47 "E .........28 -- E .48 6z~2.83 S 2553.72 E 2418.20 E .01 666.70 S 2428.50 '- 24:~6.37 E .... 2.59 ......... 6'g I-;'~ 6---S --25UT;'77--E .......... 5000.00 3818.03 3712.03 51 3 S 69 12 -51-0-'0.--0-0- 3979.81 - 3775,61 .... 52 38 ' S'68' 18 5200.00 3940.05 .' 3834.05 53 16 S 67 ~2 5300.00 ~999.76' ~893.76 53 24 S 66 36 ~'~'O~'-J~O .... 405-g,~7 ..... J9'53~67': .......... 52-59 ....... S 66 12 E 1.82 717.86 S 2575,99 K 2650,2R E 1.74 ~'6'-~ 2'6W~7--'E .... 2'72878? .... E .79 776,26 S 2721,28 E 2808.69 E .89 807.~0 S 2795.20 E 2888.91 E ..... ,'52' 8-5~'.--q6'S '' 2-B-6~;'b-T-E 2'9'68;'~7 ..... 5500.00 4119.81 4013.81 53 ~ S 66 lB E ~-6-0~00 .... ~1~'9-;-.6-9-----~0-73-;~9 ........ 53 22"' S' ~6'" 5'E ........ 5700,00 4239.58 4133.58 53 2 S 65 6 E 5800.00 4300.43 4194.4~ 52 0 S 64 48 E "-'~D .....~'~ ...... /£'~'~ ~"~ ......... ~"~'~" ~ ~ ' ~ ~ ~ ~ - ¢ ~ h - ~ ~ · 1! 871.64 S ",~4' 903.9~ S · 87 937.04S 1.07 970.64 S ~ ........... ~.~-~--.,~--~ 2941.70 E 3048.85 3087.91 E 3208.99 3159.80 E 3288.29 ~.~.~ .... ~ .......... ~ ~ ~ ~ ~ ~ ......... ARATHON OIL COMPANY -GRD ¢SEC29 TOgN R13W) RADING BAY UNIT -E'A ~K'X 'OSS SURWEL · TR'UE .: SUB I o~TE' OF SURVEY APRIL VERTICAL SECTION DIRECTION NL SPERRY-SUN INC .................... RECORD' OF 'sURVEY COURSE COURSE DOG-LEG ~EASURED DEPTH VERTICAL ~''''';' ~'~' ii SEA %¥: PAGE --3''~~ 29, 1982 EOSS-16012 DEPTH TVD INCLINATION DIRECTION DEG MIN "' DEG MIN SEV RECTANG'UL'AR COORDINATES .VERTICAL · D.E G / 1'00 ....... .~-6D"~'H-/'~~6'OyH-' .... ~'-~':§-t'/lj~-§'i' ...... : ST C' T I O'N ............ 6000.00 4423.27 4317.27 . - 6100,00 6200,00 GtO0,O0 'g'~"0-0'-7o o 4485,03 4546'89:: :4440-89 , 4608'98 4502.98 ~671.68 45g~lg'~ ..... 52 0 S 63 36 E .38 1039.58 51'4~'~ ............... S':':'~'3i~"E ................ ;'~ lOtiTf4.'s 51 5o s 62 5~ E .33 I110.28 S 51 23 S 6~ $ E ,77 ' 1146'48 ' 50'58 .......s 61 AB E ........... 'A9 .......... Ti~'5;i-i 6500,00 4734.78 4628,78 50 47 6600.00 . .......... 51' 15 6700.00 4861.33' 4755.33 49 41 6800,00 4928.31' · 4822,31 46 13 "~9oo.oo 4995.~1 ~'~-69%31 .... 49 ~9 3301.77 E · 337'2.1~'E 34~5.91 , ~524.41 '.'3442.20 E. 3602.79 3511,73 E 3680,92 ~'~"8-D"-;--4'~--~ .......... -3'758 . 52 S 61 36 E .23 S'62'"1~' E ...........'71 S 62 12 E 1,56 S 67 6 E 5.0.5 'S 67 54 E ............ 3.49 1219,89 S 3648.79 E 3835.75 3 ~ i'"~";'f'8 ..... 1256,45 S . 3717,4'0 E 1292, 36 S 1324' 15 S ' 1352,56 S 3785,65 E 3990,0a 3852,76 E 4064,23 --39-2-.t'T3-4-E ........ 4"1-3 e. 46 -- 7000.00 7100,00 7200,00 7300,00 --7-Z¢ ~'(F; 00 5059.68 4e53.68 50 1.5 s 67 ,,2 --5122.89. ;..:.> 50~-6-;'~'9 ........ 51 22 ...... ~' 'G$ 30" 5184.80<:i.'." 5078.80 52 8 S 65 48 5246'14-' 5140,14 52 11 S 65 30 5307,48 52'b'[~'~8 '52--8 S 65"18 E ,59 1.381,47 S E ........ i"'48 ............. 'Ti-4~:i' ;'63 S E .9`* 14~3-.~8 s .. E ,24 1475,9~ S 'E ........ .'17 ........ 3992.20 E 4214.98 4135,41 E 4370,99 4207.36 E 4449.94 4'2'7~ 7i g-E ........'45 D '~'; 8'9'--- 7500,00 7600.00 5368,8`* 5262,8R 5431,26 ' 5325;26 7700,00 5494,38' 5388.38 7800.00 5558,47 5452.~7 --7~-O'(F?O-o 5624. ~ 4 .5'-5i' 8'. 44'" 52 10 S 65 12 50 35 S 63 42 51 8 S 64 6 49 8' S 65 30 48 18" S 68 48 E ,08 1541,88 S "E ........ 1.96 E .63 :1609.70 S E 2.27 1642,38 S E 2,62 ........ 4350,87 E 4607.R1,,__). ~-~ ~-IT'3-~-E' A 68' ~491,02 E 4763.30 ~560.~7 E ~8~0.00 ~'6~;'72-'Z ..... ~ ¢~ 5'. 15 8000.00 5691.22 RIO0.O0 5758.35 8200.00 5826.28 8300.00 5894,97 ~400.00 596~.`52 5585.22 `*7 55 5652-;35 ..... 47 '46 5720.28 46 40 5788.97 46 3`* 5f~58.32 ' ' '45' 37 S 68 30 S 68" ' 0-' S 67 `*2 S 67 18 S 67" 24 E ,45 1698,66 S E ....... ,-A o ............... fT~"EFI3--S' ' E 1.12 1753.8o s E .30 1781.61 S E '" .96 ....... 4699,05 E `*·989.56 4'TG"Tg~-O E - 5'0'6'3 ;66- 4835,87 E 51`57,04 q90.5,01 E 5209,71 4 9 g9-;"5 O- F ..... 52 A'i'; 7 6- ......... 8500.00 6054.47 5928.47 45 18 8500.00 6105.02 59'§9-;02 ..........44 '5R- 8700.00 6176.10 6070.,10 ~+ 26 8800.00 6248,03 6142.03 4.5 35 "~-90-6"~'0 O --63 i~ 0,66 6-2i'4;6'6 43 16 S 66 S 67 S 66 S 64 S 64 54 E 6 E 0 E 48 E 48 "~ ,AT 1837,03 S 5035,17 E 5353.03 ,37 ..... ~ ~ 6 ~--~, 2- s 51-~0~-~/--~ 5'A-2~. ~ 0 .94 1892,71 S 515~.93 E 5494.23 1,1.9 1921.63 S 5228.10 E 5563.67 ;32 ........ f'~5'OT~9-"~ ..........5'2g-0';29-~ ........ 5632.'35 'l A R A T H ~ ~r~-O'~I~--'~-O-R-FFA N Y )-$RD (SEC29 T09N R13W) FRADING BAY UNIT ~ L-A-S K-A' 30SS SURWEL TRUE SUR C qEASdRED VERTICA~ . SEA INC -DEPTH ~DEP'T~ TVD .... D 9000.00 -~0'~;'00 9200.00 9300.00 .... 94'0~'F0"0 .... DATE: OF. SURVEY APRIL VERTICAL SECTION DIRECTION NL SPERR RECORDOF OURSE COURS LINATION DIRECT EG MIN DEG M Y-SUN INC SURVEY .......... · E DOG-LEG , . TOTAL ION SEV RECTANGULAR COORDINATES IN" 'DEG/IO'O ..... NOR'THT':~OUT'H ........... ~sTIWE-ST ....... 9500.00 6757.01 6651.01 "~EO'0%0"O ........ 682'8,581-;':~-~'~72~';58 ..... 9700,00 5899.95 6793.95 9800.00 69'71.59 6865.59 ..... ~900-;'00---'--T0~'I-'4--- ..... 6937;14' 43 50 44'46 q~ 10 qq 20 4A 17 10000.00 7114.99 7008.99 ~3 51 1-0'[0-0 .--O-O .... T~2-3---70'81-, 2:5 ..... q 3 ' 38 10200.00 7259.20 ' 7153.20 ~4 19 1,0300,00 7330.66.'. ' 722~.66 4~q 28 [-0"~ 0'0 ;'0'0 .... :--- 7'z~0-2-;119------7296';'09 ...... ~4 22 10500.00 7a73.52 7367.52 4q 2 1'0~0'~;~0~--7~A~6. -'7'4'3'B;9'6 .......... 44-2 10700.00 7616.70 7510.70 ~ · 10800.00 7688.38 '7582.38 ~4 2 · I~9'OO;"OO~----TT6~.--I"g--~T65~.l'8 ......... 43'~ 11000.00 7832.6~ 7726.64 43 18 YTI~-O~OI:I 790-5.83 ' 779'9',~'3 ...... ~2 37 11200.00 7979.79 7873.79 ~1 58 11300.00 8055.09 79q9.09 qO 20 I-I-4-0'D~-.00~B1~-3-~.-76----- 8025.76 39'34 -' P'~ GE .... 29~ 19R2 DOSS-16012 VERTICAL S E'C T'I 0 N E 1.q6 1979,90 S 5351.37 E 5699.90 E ' " II' 56 .............. ~2'~'0-8';-. 58-'S 5-~72-;'5~7--E- --'5,'767';"4"6" E .90 2037,28 S 5~75.42 E 5836.51 E .3~ .2065.92 S 5538.72 E 5905.96 E ..... ' 61 =2 O~YZ~.'5~S ........ 5'6'0'1-;5~2--E .......... 5~)'7 ~+-; 95 11500.00 P. 209.35 810:3.35 38 40 '1-1-6-0-0 .---O'O- 82-8'778'6--'-B18I';B6 .......... 37 53 11700.00 8367.52 8261.52 36 29 11800.00 8q~8.58 83q2.58 35 13 l'Ig OO-;-O 0 ....... 85~50-; 81 ....... 842z+, 81 ....... 3q' .9 S 6q 54 ....... S 65 .... 1.'~ S 6q 35 S 6q 36 S 6~' 42 E E E E E · ~+6 2123.6~ S .......... ,' 98 ............ .78 2182,71', S · 17 2212.6~ S ,0'8 .... : ...... -22 566q.08 E 60q3.qO 57777'~'~-"'~- ........ 6'1'13;7'0 ....... 5790.88 £ 6183.70 5853.91 f 6253.ql 5gI7';O'q-E ........ 6~2~';'20 ....... S 64 12 S 63 2q S 63 30 S 65 12 S 63 6 · 56 2272.5~ S ..... · 59 .... · 67 233~.11 S · 26 2~65.48 S .... · 11 ........... 5979.79 E 6392.68 ~O qTT'8-3--E .......... 6 z~ ~-I';'71 ...... 6103.95 E 6531.01 6165.~6 E 6600.8,1 522 B';'"90--'E ........... 6670,63 '-~ 8 62 48 621q2 62 1~ 61 g8 61 18 E .23 2~28.92 S E .q3 2~93.15 S E .54 2525.81 S E ..........'69 255'8~97----5 6291.2~ E 67~0.q4 ,___ 6'55-S ;-¢4--E ..... -GA '1'Ir'; 21 -- 6q15.24 E 6879.E6 6q76,83 E 6949,11 '65 3'8'; 'O'$--E .........70'1-8 ', ~' 0--~ S 59 5 S 60 3 S 60 S 59 2 S 60 1 4 E 1.10 2592.80 S D E ..... .79 ........ -26~6-S 0 E .73 2660.06 S q E 1,69 2693,26 S 8"'E .... .96 .............. 2725';'51--S 6598.07 E 7086.87 --'66'5'7.--'2'T ~ 71'5q~.'53 ...... 6715.63 E 7221.35 677'2.q5 E 7286.61 6-8'27~g~-E .......... S 60 18 'S 61'" O' S 60 q2 S 59 q8 E .90 2756.76 S E ......... ,88 ........... --27'87.-~I-2--.S E 1.41 2816.56 S E 1.38 28~5.63 S E ....... 1.06 ...........2'87q~'2~-$ 6882.76 E 7q12.95 6'93'6-;-7'5--E ....... 7qT'q'. 50 .... 6989.5~+ E 753q.59 7040.39 -- 7592.75 7089';'57- E ....... 76 qg. 19 ........ IARATHON OIL COMPANY -GRD (SEC29 TOgN R13W) RADING BAY UNIT ,LASKA ,OSS SURWEL IEASURED TRUE SUB VERTICAL SEA DEPTH T-'VI~ DEPTH DATE OF SURVEY APRIL VERTICAL SECTION DIRECTION PaGE 5 29e 1982 BOSS-16012 NL SPERRY-SUN INC .............. REcoRD, OF-'SURVEY ............ COURSE COURSE DOG-LEG TOTAL INCLINATION DIRECTION SEV RECTANGULAR COORDINATES VERTICAL BEG MIN ....... DEG.MIN ~"DE'G/I'O0-'~'O'R-~'~SOUTH-- EAST/WEST ......... ;'SECT-ION 20 21 ,22 23 00.00 00.00 00.00 00.00 00'00 8613.85 8507.e5 63 35 8 9 7 :; . ........ .' 3 2"2 8'" 8782.29":: 8676.29 31 58 8867'..72: 8761.72 30 ~0 8954,46 88q8.46 29 ~2 S 59 46: E ,57 2902,28 S 7137,73 E 7704,46 S 60'' 6 'E ........ i.'i2 2929,57 S 7184,90 -'_ 77'5'~'. 5 ~' S 60 48 E ,62 2955.86 S 7231.28 E 7811,50 S 60 36 E 1.31 2981.30 S 7275,61 E 7853.16 S '59 "36" E ............ ]",69 3006, 11 S 'f'3"i-9"~7~ E '-7'a)'f2;5~, .25 26 .27 .28 29 00.00 00,00 00.00 O0-O0 9042.24 8966.24 28 12 '9220,48"!i.?~ii:!; !'9114,~8 25 41 9310'81< '": ]920~,81 25 7 00,00 9g01.88 9295.88 2 S 59 0 E .89 3030,56 S 7360.94 E 7560,02 "' S" 59" 6- E ...............i'"~'1 305~,39 S 7400.67 E RO0~;~9--~ S 59 18 E ' 1.30 30.77.11 S 7~8,78 E 80~9.$~ S 59 42 E .60 3098,88 S 7475,74 E 8092.~6 .... S 59 '0 .... E 1.45 ~119.9~ S 7511.28 E ..... ~'~'~'~';"~O .3000,00 .3100.00 .3200.00 .3300,00 .3qO0,O0 9494.13 9388.13 21 q3 9587,76 94'~'i-;"76 ...... 19 23' · 9682.~8 '9576.48 18 2 9777,70 . 9671,70 17 32 9875,22 9'?g'~';"22 ....... 16 5~ L3500.00 9969~22 .3600.00 10065.54 .6700,00 10162.18 S 57 12 E 2.09 ~1~0.33 S 75~q.05 E 8171.q2 S" 56'1R"E ..... 2,3~ $15~.58 S 757t.41 E 8205.0.7` S 54 48 E 1.44 3177,73 S 7599,86 E 8237,q0 S 52 30 E .86 5195.83 S 762q.q6 E 8267.11 S' 52'-'12 'E ............ ~'66 ........ -'~.-~3'.-91 S 76q7.~9-0-'-~ .... ~2'm.~"~-73 9863,22 15 39 S 5a ~2 E 1 4" . . . · . ~_ 3230 60 S 7670 qO E 8622 96 9~-5.~';~4 ....... 15 31 ........ S 52" 6'"~ .... ,'71- 52~6,62 S 7691,97 · 10056.18 14 15- S 52 36 E 1.28 3262.31 S 7712.31 [ 8373.~1 ** T~E C'ALCULATIONS ARE BASED"'ON THE' AVERA'G'E" ANGLE METHOD ** HORIZONTAL DISPLACEMENT : 8373.91 FEET AT SOUTH 67 DEG. 4 MIN. START OF SURVEY WAS 106.00 FEET ABOVE SEA LEVEL EAST (TRUE) ~RATHON OIb COMPANY · -GRD (SEC29 TOgN R13W) ~ADING BAY UNIT· :)SS SURWEL '. ~. TRUE .'A SURED VERTICAL ~E'P~H --D'EP-rR DATE OF SuRVEy APRIL VERTI'CAL SECTION DIRECTION 29, 1982 NL SPERRY-SUN INC ................ · .... RECORD .... OF"SURVE'Y"' ....... COURSE COURSE DOG-LEG INCLINATION · DIRECTION SEV BOSS-16012 SEA RECTA. NG:ULAR COORDINATES VERTICAL T'VD ................. DEG MIN DEG MIN ....... DEG/I'O 0 ....... N'OR-TH71S'O'UTH ....... K'AS'T-/I~E'ST ' 'SECTI"ON ....... 0.00 -I-'0-0-7'0'0 200.00 300.00 -'¢"00 ~0"0 0.00 -106,00 ORIGIN AT SURFACE 0,00 N 1-O-O-~O'O::. ' . -G"TU'U' '. 0 .... 4 .................. S'"34 18" '1~ ........... -'~06 ,.. ::: .09 S' PO0' O0 /!.94. O0 0 ' 8 N 68 1~ W .13 ::.: ":" '00 S 300.00 :.:.",::':"i::.194.'00' .d 12 N 72 42 W . .07 ." ';i .:'::".:: .,..10 N --"~-0-0';'0'0 29'~-;00 .................. 0 '20 ..........S"' 66' 6 E ................. , 54 ............ -~. ~S O. O0 E .06'W ....... · 271 W .60 W . 0.00 '---~"02 .... -.25 · -.59 ---. O'O ..... 500.00 700.00 800.00 -9'0' 0';'0'~ 500.00 394.00 0 20 59-9~99:...:.:...'..:...~-~3~9'~ ................... 0 2~' 9'9 9 !.::.:.' .:.: '.. 5 o A. 2 799'.:9~ .: 693,94 1 38 · -8'99:'7'0 7'9'3'";-7'0 ......... 4 1 S 2 42 W .38 .71'S ....... S-'30 12. E ............. ,22 :i i:i 1'-~32-S s 1 E .4o · 2.s4 s S. 30 AP, E ~.09 ' '.' 5,00 S S' 72 !~ 'E .....3,00 T;T3--S .09 W .~-'E · 29 E 1.76 E .2O 1,26 3.57 1'0 ;'55 1000.00 999,08 895.08 6 2 I'l-O'O-;-.O-O' 1-097,94. 9~1~'9~ ............8'4 . . . 1200.00 11e6.~3:.:i:..:..../:10~0.~3~ 10 1 1300,00 1293.34-: 'i' 1187,34 lA 4 7 2' N 89 0 E 2.~9 6.93 S S-'-8'6T'30 'E ............ 2,'33' - .. ~,-8'b S S 78 48 E 2.05 '11.32':S S 77 30 E 3.78 . '1'6.57' S ' S"76' 4F:' E ' 3.'50 ............. ~:-2'3',-4'6= S 19.58 E 20,73 · ' $ 4-'.-Eli ....... 34':-9-3'-------') ' 52.12. E 52,4.1 / · 75.82 E 76.28 j TI75";-r'5--E- ....... "1-05% 9' 8 1500,00 -1-6-00-;00 " 1700.00 1800,00 'I 9-O ~,-'0-0 S 76 36 E 2.68 31.A7 S " S"76''30 'E ........ 2.82 .... ~.ED~$ S 76 30 E 2.79 "50'77 'S!:: '.i:. :, S 76 12 E 2.84 62,22 S ..... S"76' 36' E .... ~';'03 7'~.--~9' S 219,20 E 221,66 265.79 E 269,02 3TSTg-U-'K '~'2~;' 83 .... 2000.00 1919.23 1813.23 35 4 '2~0'0,00 -19¥I.8! '1'~9'1'-,8"'f'- ....... --38-' 9' ' 2200.00 2072.95..i:. 1966.95 41 20 2300.00:' 2145.30.:..::. :..' 2039.30 ~,5 40 '~-O ~.-'00-'-----2'2-F~; 5'9 ..... 2 r0-8';"~9 ................ ~+ G'-'l 8 .... S 76 54 E 3.38 87.41 S ........ S'"77- O"E ...... 3;08-- --10i.3i- S S 76 54 E 3.19 116.28 S S 77 6 E 2.32 131.69 S S' 76'I2'E ..... 2';'T2 1-4'~--s 372.86 E 377.44 497.38 E 503.37 . 56~.~8 E 571.~5 634.89-5-- '6-~2';~3 2500.00 2280,52 -2600',00 2541-12 2700.00 2398.67 2800.00 2456.73 ~'90~-.--00 .......2,~i'-~3-07 ...... 2174.52 48 36 S 76 6 E 2.30 2255';I'2 ..........52-42 ....... S"76 .....6'"E ........ ~:'IO 2292.67 5q 52 S 75 36, E 2,20 2350.73 54 31 S 75 48 E .39 2'4'08~03 ............. 55 '2 ..........S'-75 36 E .......... ¥55 166.96 S 707.70 E 716.81 · 186,07- S- - 78-~~E 795¥~7---- 206,41 S' 864.12 E 876.24 226,38 S 943.06 E 956.71 2'~'E;-T6" S i O~2';-~F-E ~ I'I~3-7'; 76-~' [RATHON OI'[~., COMPANY -GRD (SEC29 TOgN Ri`3Wi ~ADING B~Y UNIT _ASKA DSS SURWEL =~SURED 3EPTH DEPTH TRUE VERTICA[. NL SPERRY-SUN INC RECORD OF SURVEY SUB COURSE COURSE DOG-LEG SE~ INCLINATION DIRECTION SEV T~D ....... DEG"MIN ......... DEG MIN ........ D'~G/IO0 · . . . DATE· OF SURVEY APRIL 29, 1982 VERTICAL SECTION DIRECTION BOSS-16012 ........ ' ':... 'TOTAL I RECTANGULAR COORDINATES VERTICAL .i NORTH/SOUTH EAST/WEST SE ~-~'I'ON .... 3000,00 2572,46 3100,00 2630,70 .... 3200,00 2689'74' 3300,00 2748,99 3400,00 2808.55 2466.46 54 15 S 75 0 2524.7~ ......... 5'~- 2~ .......... s .... 75' 'i2 .2583,7~ 53 49 S 7~ 48 2642,99 53 40 S 75 O 2702,~'~ ........ ' .... 53"'26 S 74 36 E ,93 267.77 S E .6 ~ ..: ":..:1309' 69 s E ,21 330'54] S E ............... · '~ O' 11oo.83 E ~1~s.1. 'l'l-'/T;-,4-2T' ' 1198.61 1257..31 E 1278,58 "t 1335,12 E 1358,37 i'~i-~ .--5-g- ' £- .... i-43- ~';- U '0 3500,00 3600.00 3700.00 3800.00 3~00.00 2867.92 2761.92 53 35 2928,'49..':: 2822";'~'~ ........... 52 ~3 3 0 5 0.8 0 :':!i(?i?.. '. : 29~4.80 52 8 --3111.80 30~'~ ............ 52"25 S 7~ 18 E ,28 "s 73-30 E .......... i';07 S 73 6 E S 72 42 E S 72 48 E .28 373,65 S --3 g6 .-.-~-5:~ 442 · 77'!'':'. S: 4 6 6-2~'1 s 1490.03 E 1517.83 1566,~2 E 1596,89 1642'19 E 1675.75 1717,57 E 1754,32 I"?'9-3-;'~-~-E--'I'g'3 3-; 16 ~+00 420 43O 0.00 0.00 0.00 0.00 0.00 3173,70 3067,70 51 ~3235 · 96 ~';':'::::':/i;!'i .'3.129.96'= .............. 5 i 3297,77 3191 · 7.7 51 3360.2~+' :!:: :"i: 325~,24 51 ~4~2.55 3"~"i g'; 55 ....... 51 46 S 72 24 E .72 29 ......... S'72"'12' ~ ............. ;31. · 49 S 72 30 E .41 20 S 73 12 E ,73 28 ...... S'72 48"E ............ .33' 48'9,95 S · ..5-1-3~~S:...-".: 537'51'S 56o,o86 186B.13 E 1911.36 2017,60 E. : 2067.55 2092.36 E 21~5.19 ....... 2~7T0-~ ...... 2'2-2-3';-0'1 460 47O 480 49O 0,00 0,00 0,00 0,00 0,00 606,10 S 62--9'32 :S 653' 18 :.S 677.05 S '. TO '~--,-4-4 s 2241.9;) E 2300.87 ~316.49 E 2~?~'.58 2.391.27 E 2~+56'75 2466.05 E 2534.92 5000,00 5100,00 5200,00 5300,00 5400,00 3798.93 3692.93 51 3 S 69 12 E 1,82 38'59'61 :i::'¥37.53.61 ~-'3'8 ............. ~--S-'-gS"'l~-"~ .... i-;'74 3919.41 '~ 3813,ql 53 16 S 67 ~2 E .79 3979.04 .... 3873.0~ 53 24 S 66 36 E .89 4039.23 393~-2'2'~ ........ 52'"59 ............. ~-'G6'"12 E ............... '52' 730.06 S 75'9.45:S 789.86-S 821.75 S 853.97 S 2610,46 E 2688,57 2684.-31'E '. 2758.46 E 28A8,18 2832.14 E 2928.46 2905,21 .... E" ' ~'~b'~ ~"3b 55O 560 570 580 0,00 4099,32 3993,32 0,00 0,00 0,00 4158.98 4219.11 4280.67 A052.98 4113.11 /4174.67 4-~352'95 .... 53 4 S 66 1P E .11 5-3-"~'2"-. ........... S" 6% 6 ..... ~ ....... ='3"~ 53 2 S 65 6 E .87 52 0 S 64 48 E 1.07 .... 52·1'3" S 64 .O'E .............. -;"6.'7 886.10 S 918.61 "S 952.26 S · 985.81 S --1-0-2'0 .--45--S 2978,40 E 3088,23 30"51.77 E 3124,25 E 3248.33 3195,55 E 3327,07 3'2~gg'58"-E ....... $'~05.g8'~ 5900,00 4341,95 4RATHO,N OIL~:COMRAN-~ -GRD (SEC29'TOgN R13W) qADING BAY UNIT OSS SURWEL DATE OF SURVEY APRIL. VERTICAL SECTION DIRECTION TRUE :i:::'. SUB :ASURED SEA DEPTH DE'PTH TVD ..... DEC. MIN NL SPERRY-SUN INC ..................... RECORD'OF SUR'V[¥ ......... COURSE COURSK DOG-LEG INCLINATION DIRECTION SEV 1982 ..................... BOSS-16012 DEG RECTANGULAR COORDINATES VERTICAL M I N ' F.., E G/1 O O ........ N'O"R-fFrZ~SO-LTTH ......... E-~'$TT'W'DST- 6000.00 4403.52 4297.52 52 0 · 6200.00 4527;24 4~21.24 ' 51 50 . 6500.00 458=,-6q .: 4483.64 51 23 6'4 00'760 ......... -4-~'5-2'7 ~; 3 ......... S 63 36 S 63 ..... 18' S 62 5q S 62 6 S' 61 4,q E .38 1055.49 S [ ...... : ....... ;'36 E .33 : "1126.58' S E .77 !'1163'15 S E '' .~ ......... I'I~.-;-8'5--S 3337.16 E 3~84.64 ~-O-T-~--E------~5-~2~;~8- 3477.30 E 3641.40 3546,35 E 3719,25 3'6I'~'81---K .............~'7~6,59 ............ 6500.00 4715.84 ~609.84 50 ~7 ~ ~ ~ ' '' 0 01 ~--~78 . 4 . :~:-7'2';'4'~ ..........51 15 ' . 6700.00 ~8'~3'13 ~737,13 49 ql 6800.00 4912,33 '" '4806,33 46 13 99"0'0';'0'0 .........4'~7'~'~-7 ...... ~7i";07' ' q9 39 S 61 S 62 S 62 S 67 S 67 36 E ,23 1236.70 S 1~ E ....... '71' 12 E 1.56 1308.52 6 E 5,03 1336.61 5'~ F .... 3.q9 .......... I3"65~.~'8-'S 36~2.96 E 3873.72 381~.~7 E ~027.42 '3885,97 E qC99.61 595'6;'58'-E ..... ~i'75',81 7000.00 7"1-0- 0~. '~' ~- 7200.00 7300.00 74'0-0700 5041.06 ~935.06 516~.87':':.!'::'."::75058.87 5226.18 5120.18 5~tf~----5'1'~1';55'- 50 13 51 22 52 8 52 11 52'8 S 67 ~2 '~S 66'30 S 65 q8 S 65 30 E .59 139~,45 S E ...... 1.~R ......... E .~4 1457.95 S E .24 1490.72 S 'E ..... '17 .............. 4027.68 E 4252.66 --;q"g~9;~'2'-E--'--'"-~3JO-;-.T8 4171.32 K ~409.70 4243.22 E 4488,67 · ~3~','9'q--: .......... ~5'67; 5 g" -. 7500,00 5348,90 52A~,90 52 10 7~-'0~-0~ :- ~'"~"~2';139 '.:': 5'30'6';'39 ........... 50"35 ...... 7700,00 5475,15':::.:~ 5369.13 51 8 7800.00 5540.557'~:'~:'543~.55 49 8 79~U~.~O~'K~"~.O~' ' 550~;"07 ..... ~8'18; ..... S 65 12 S63 .... 42 S 64 6 S 65 30 S 68 44 E .08 1556.83 S E ...... 1'.96 ..... E .63 1625.087 S E 2.27 1656.qq S E ..... 2.62 ........... "F68"5';"~q~ S 4386.63 E 4646.52 4525.94 E q801.ql 4594.77 E 4877.01 q'664'.-~-8--E ....... q'95'/";Gq ..... 8000.00 5674.10 5568.10 47 55 ~1'-~0700 ' 5741.32 - 56'35-;'32 ..... 47"46 ........... 8200.00 5809.96 5703.96 46 40 8300,00 5878,70 5772,70 46 34 '84~07'0'0------5'~';-6~-----5'~2;66 ....... 45"37 .... S 68 30 S 68' 0 S 67 42 S 67 S 67 24 E .45 1710.64 S 4733.42 5 5025.83 E .......... .qO ......... --1-F'5'~3i S 4~;'OT-K ...... 50'99;85 ........... F 1.12 1765.97 S 4869.36 ~ 5172.58 E ,30 1794.00 S 4936.35 E 5245,20 E .......... .96 ............ I8'~I~q'6--S --SO'U2~'32-E ...... 5~1-6,-E6 8500.00 6019.00 5913.00 q5 18 --~6--O- 0 m' O O - -~07T 9 , 76 5 ~8 iT'; 76 ........ 4 q 58 8700,00 6161.17 6055,17 qq 26 8B00.00 6233.61 6127.61 43 35 -8'9 0 O-;-O 0~'-6'30-~-q-3- ...... 6'200 "'~ 3 - q 3 ' 1 6 S 66 54 S "6 7 6 S 66 0 S 64 4~. S 6z~-' q 8 E .47 1849.35 S E .... ,37 .......... 718767-8'4'S E .94 1905.32 S E 1,].? 1934,67 S E ........... .32 5067,70 E 5387,74 5i'3'-2-;80--F-~--'5458.-~0 ...... 5196,75 E 5528.39 5259.12 r 5597.27 5321'";'13--E ....... 5665.75 ......... ~RATHON OIL coMPANY · GRD (SEC29 TOgN R13W) :ADING BAY UNIT ]~SKA ISS SURWEL 'ASURED VERTICAL.:;';./i:.:' ".' i:i:" SEA )EPTH DEPTH TVD · ..'.... ' . DATE. OF... SURVEY · APRIL 1982 VERTICAL SECTION DIRECTION BOSS-16012 NL SPERRY-SUN INC ............... REcoRD OF sURVE~ ......... "' ~ COURSE COURSE DOG-LEG " ":: TOT A L".' ~::.: :.:. ".'. ':. INCLINATION DIRECTICN SEV R::EC~Z!;:~:'GOLAR coORDINATEs VERTICAL ........ DEG MIN .......... D'EG ~M'IN 'D~G'/IO0 NORTH/SOUTH EAST/WEST SE~'~'N ~000,00 ~100.00 ~200.00 :' 3300°00 -, ~"4'0'0 ;'o o-- 6380.95 627 .9 6 5 .80 80 6525.56.:!i:]. :.6~19,56 q~ 8 .. S 65 30 E ,90 6597,65 "::: "6491,65 6670,29 656~.29 1992,66 S 5381,28 E 5732.37 2021,,18 .S ..,::]. 2050.06 S · 2078.~7 S 5q~3,5.7 E 5~00,85 5506,94 E 5870.~6 '5570,.15 E 5939,75 2107,30 S 5632,5~ E 6008,~5 ~500.00 P60O,O0 ~700,00 ~800,00 )900.00 2136.68'S 5695,26 E 6077,65 9.166,11 S 2195-99 ,.,s 2225.96 · S 5759,2~'E 61q8.0~ 5822,17 E 6217.64 5885.30 E 6287.46 2255,80 S 594.8,43 E 6357.23 )000.00 3100.00 7100,39 6994,59 ~3 51 S 6~ 12 E 7172,76:"."..:.: :'7066'~7~ ...... ~3 38 ........ S 63 '2~"E 724~',31:,.:']!]':'7138,31 44 19 S 63 30 E 7315,69 : 7209,69 4q 28 S 63. 12 E 7387,17 f~-~i7' 44 22 S 63 '6 E 920 930 040 0.0 0.0 0.0 .56 .59 .67 .26 ....... ; 'ti" 2285,95 S 6010.80 E 6426.~+2 6072.51 E 6qCJ5.29 61;35.02 E 6565.01 6197.5~ E 6634.89 6259.9o~--[ 67'b,~ .65 · 2316,86 S 25~8,02 S · 2379.60 S 2~11.24 S ]500.00 )GO0.O0 0700,00 3800.00 bgoo.oo 7~58,53 7352,53 44 28 S 62 q8 E 7530,07- . 7~24,07 ...... 4¢"20 ......... S '62"~2 E 7602'00:ii;:.:. 7496,00 q4 0 'S 62 18 E 7673,~ ' .7567.~ ~4 25 S 61 ~ E 77~5,59 7'~9";59 .... ~3"~9 ....... S 61 18 E · 23 2~43.26 S .............. ii"6"- 2,~75o3! S .43 2507.60 S · 5~ 2540.67 S ...... '69 ............. ~57~,92 S 6322.21 E 6774.51 638q.30 E 6844.19 64q5,81 E 6913.42 6507.q8 E 6983,10 6568.2'i~~-'~'0% ~. 99 1000.00 7818,37 7712.37 1100,00 7891,95 1200.00 7966.30: '. 7860.30 [300,00' 80~2,53~ 7936,53 l~O0.O0 8119.63 801~"~'3 4.3 18 S 59 5q E 1.10 2608.;32 S 42 .... .57-' ..........S 60' 30 E ............ .79 264i;66 S 41 58 S 60 0 E .73 2675.10 S ~0 20 S 59 2~ E 1.69 2708,0q S 39'-34 S 60 1R"E .... .96- 2739,60 S 6627,55 E 7120.04 67q~.qO E 7253.67 6800.10 E 7317.82 i, 6855.43 ~ 7~g'Cjo'g ........ 1500.00 8197.72 8091.72 1600,00 8276.6q 8170,6q 1700.00 8357,03 8251,03 1800.00 8438.7q 8332,74 i-~'0' O-JO'o- ..... ~ 5-~'T-J~'¢ ....... 8 ~'~ 5", ~ ~ 38 qO .37 5:3 36 29 35 13 3q 9 S 60 18 E .90 2770.55 S S' ~1 " b- E ........ "P.P, ...... ~.-8-0-0,-;-3'2- S S 60 42 E 1.~1 2829,43 S S 59 q8 E 1.38 2858.43 S S 59 48 E ........1.'Og ........... 2'BB'6%-.67-S .6909.69 E 7~43.!0 6963. q'O E '" 7'5'0'~.-1'7 .... ] 7015.26 E 7563.27 J 7065.10 E 7620e~7 i 7 '1-I-3-;'b'*-l---E------7 g 76' ',-1'5 ....... hR A THON 0 rL-'~C-O-J~P~ -GRD ¢SEC29 TOgN R13U) {ADIN$ BAY UNIT _-A'S K-A ......... DSS SURWEL TRUE "ASURED VERTICAL' D E'P'I'-H UEP'T-H NL SP ............................ 'RECORD SUB COURSE CO SEA TV'D DATE 'OF SURVEY APRIL 29, 1982 VERTICAL SECTION DIRECTION BOSS-16012 ERRY-SUN INC OF'SURVEY URSE DOG-LEG TOTAL INCLINATION DIRECTION SEV RECTANGULAR COORDINATES VERTICAL DEG MIN .......... DEG MIN DEG/lOO 2000.00 8604.80 8498.80 33 35 S 2-I-OOTO-O----F6¢9';-I ? 8-583;;'17 ....... 52 28 ......... 2200.00 8774.00 8668.00 31 58 S 2300.00 8860.02 $754,02 30 40 S 2 q:'O 0';' 0'0 ...... '8'96-T,-~-5'~B' '84-1'-; '4:5 ..... 29 2 ................ S 60 48 60 36 59' "56 E .57 2914.A9 S E'' 1.12 ......... --2'~~5"-S E ,62 2967°08 S E 1.~1 2992.12 S E ....... 1',69 7161.42 E 7731.02 725A.17 ~ 7836.~4 ,' 7298.60 E 7887.61 2500.00 9035.58 8929.58 2 2 ~0'0; O 0 ......9-I-2~~-9'D'YB';'69 ...... 2 2700.00 9214.81" ~9108,81 2 2800.00 9305.36 9199.36 2 ~-9~'0-"00~--~~'93 ..... 929'0 ."9' 3 .......2 8 12 S 6' 59 ......... .... 'S" . . 5 7 'S 59 0 59 ...... 59 18 59 42 59' O' · 89 3041.02 S ........... 1';2I 1.30 3086,-q6 S · 60 3107.87 S ......... 1";'A5 ................ 7380.98 E 7982.53 ~]'9",-'-9~~-[ .... ~U27.q8 7457o19 E 8070.43 7q93o83 E 8112.51 3000.00 9489.83 9383.83. 21 43 S 57 12 31-'D'O-TD-1T~?5.8~-6 .... ' '9Zi7~;'16 ....... 19 23 ....... S '56 .... 18 3200.00 9679._25 9573.25 18 2 S 54 48 3300,00 977A.60 9668.60 17 32 S 52 30 3'zFDO;-O'O ......'9870-;2'~ ...... 9'764,28 " 16'53 S 52' 12 E 2.09 3148.61 "2';35 3'I~7.us 1.~fl 3184.87 · 86 3203.22 ...... ,66' ......... 3~'2'1'~2--S 7559.38 E 8188.76 ! ~ 87 ;-OU-'E-------82'2Y-~-37 ..... } 7612.29 E 8251.62 t 7636.20 E 8280,79 } 75'59';- I'6'--E---~ 8'3~'8-~8 7 .... 3500.00 9966.58 9860.58 15 39 S 54 42 E ~6-0-0~-'0~--"--T~'0~-2~9'3-------99'5'6"~93 ...... 15'31 .... S 52 -'6 E'" 3700.00 10159.85 10053.85 14 15 S 52 36 E 1.42 8236.61 · 7I 325'3'70'5 1.28 3268.00 *'*~-THE--CA'EcUE'ATIONS ARE BASED ON THE TANGENTIAL OR 7681.17 E 8335,22 E' 7~56I";U7 .... .~' /70~29 7721.84 E 8384.91 'T E R'M TNA~'-A N b'~iE_--~T~TT-IUD--** HORIZONTAL DISPLACEMENT : 8384.91 FEET AT SOUTH 67 D:$. 4 START OF SURVEY WAS 106.00 FEET ABOVE SEA LEVEL MIN, EAST (TRUE) AR~-iHON- OIL ~"O'MPANY ~-GRD (SEC29 TOgN R13W) 'RADING BAY UNIT ~OSS SURWEL IEASURED "D E PTH' "VERT ICA[. /i:! /' SEA · , DATE OF. SURVEY A3:{IL VERTICAL~ SECTION DIRECTION 29, 1982 DE~TF-q BOSS-16012 NL SPERRY-SUN INC ' .................. RE'CORD 'OF 'SURVEY ........ ..:. .. . '.. COURSE COURSE DOG-LEG ' '- .... '":~:. ' TOTAL' ' INCLINATION DIRECTION SEV RECTANG'ULAR ·coORDINATES VERTICAL T'VO ................ DEG M I N .......... DE G' M I N DE 0 / i'O o ..... N'O ,'T 7'SOUT' ..... 'A'S-r/U ST -SEC T I'ON ..... 0.00 ' "-1-0-0~-. 0-0 200.00 500.00 ..... ~"00'; 0'0 0.00 -106.00 ORIGIN AT SURFACE i'00;'0-0 " -~."0'0 ..................... 0 .... 4 ............ S"'34 .... 1~ W .........'06 200.00~:;...: ,: ..94..00 0 8 N' 68 18 W 300.00 ::! .. '119~..00 0 12 N 72 42 W .07 --~'OV.--1TO ......... 2'9¥;-0'0 ............ 020 ..... S'66'"6 E .............. '5~' 0.00 N :..:.0~ S .. ".', 05 N · 00 E .16.W 0.00 -.O'T -.13 -.42 -.30 ........ 500.00 600.00.. 700.00 800.00 -"-9'0~;'0'0 500.00 394.00 0 20 S 2 42 U .38 ~'~-~-~79 9! :.i:i .. :':: .!.:: '~ .:...::...~'~'3-79~ .............. 0 "2~ ..... S' 30' 12 :E .....7 ....... .22 ~99"9 1'99 - 0 e2 S 1 1~ E. .40 ,. 799.97i !::!'i:"~:::'ii'693.97 1 38 S 30 48. E 1.09 , ~'9-~.-;~'2 793"'82 ........... 4" 1 ...... S' 72 I8 "E 3" O'O .10 1.01 2.~1 7;'05 1000.00 999.39 893.,59 6 24 N -Y'i-O-i3 ,'7110~ ' 1'0 ~:8-; 5'1.?'.i ~9'~;'51 .......... 8' 4 0 ...... S' 1200.00 10 17 S 1300.00 129~.83 "::i. '1188.83, 14 3 S '-I-~ O0-VO-D---~I3 .'~,';lI1 ........ 1-2T. 8'5~"01 ........ 17' 32 ' S 89 0 E 2.89 7.03 S 86' 3"O'"E ........... 2';~3 78 48 E 2.05 ' '9.59 S. · 77 30 E 3.78 13.95 S 76'fl8' E ..... 3.50' 14.01 E 2-7, 09- eL 43.36 E 63.97 E 90 15,64 27';~-'~ 43.67 64.35 --~1'¥1"~' 1500.00 1485.61 1379.61 20 13 S 76 36 --I-~-0-0.00 ..... 1578.54.'' 147"2';'5~ ........ 23" 2 .........S'76-'3'~" 1700.00 1669.55. 1563.55 25 50 S 76 30 1800.00 1758,43 1652.43 28 ~0 S 76 12 -¥90'0~0 ...... I-8~.~-~ ..... I7'38,84 .... 31' 41; S 76 36 E 2.68 27.46 S E ........... 2';82 .... E 2.79 ~5.69 S E 2.84 56.50 S E .... 3.03 .............. 68',-30 S 121.97 E 123.03 ~ lbZ';R'l =E 159¥38- ,; .... 198.02 E 200,18 242.50 E 2~5.56 .2~,1-;-3~r-1~ 2~;95 ....... 2000.00 1928.31 1822.31 35 4 S 76 54 E 3.38 -2-1~0~0~- ~200'8.5'"'5 :. Ig0~;-55 ..... 38 9 ..... S 7T "O E ...... 3.'08 2200.00 2085.41> ~...: 1979.41 ~1 20 S 76 5~ E 3.19 2300.00 2159.13 '~:; 2053.13 ~3 ~0 S 77 6 E 2.32 -2~00-;-00- - - 2'229.8'~ 2'l-~S;'g~ .............. 46 '18 ...... S '76'-12'-E ............. 2.72' 80.90 S 9-~.~6 S 108,80.S 123.99 S 344.8fl E 3~9.16 ~65.2I E ~70.86 531.03 E 537,39 2500.00 2297.z~5 2191.45 48 36 S 76 6 E 2.30 '--2"~-0-0.00'- ' 2360.82 "225-4-';'82 ........... 52 -~2 ......... S 76-' 6'E ........ 4'"1'0 2700.00 2419.90 2313.90 54 52 S 75 36 E 2.20 2800,00 2477.70 2371.70 54 ,31 S 75 48 E .39 -29'0'0'.--0'0'-- 2555,58 ..... 2'~29',-38 ............ 55' '2 ..... S '75" 3S'"E ............... ;5'5 ..... 157.95 S 17~.5i_S 196.2~S 216.39 S "--23'~;57 S 671.29 E 679.81 1{6"3i E 82~.52'. E 835.85 903.59 E 916.53 ~R~T~-'""_'D--'': tMARATHON O.IL D-GRD (SEC29 ..TRADING BAY COMPANY TODN R 131~) UNIT ALASKA BOSS SURWEL MEASURED V DEPTH DEPTH TRUE E R.T ICA L ~".: NL SPERRY-SUN INC ...................... 7RE'C'ORD oF" sUR-V~'y ...... .. SUB' COURSE ' COURSE DOG-LEG SEA INCLINATION DIRECTION SEV --TV'D-- .............. D'EG 'HIN DES MIN DATE.· OF SURVEY APR IL VERTICAL SECTION DIRECTION 'PAGE 2 29, 1982 BOSS-15012 , . . REC:TANGULAR cooRDINATEs VERTICAL NORTH/SOUTH EAST/WEST SECTION 3000.00 2593.24 2487,24 j3100.00 3200.00 t oo.oo 3400.00 2651'5.8.1:.!ii..~ ~ 2545:.58 2710.~22 '~i~: i::.:2604.22 2769,37 '2663.37 2828.77 2722.77 1.5 .............. s .... 75 ....... o 54 23 S 75 1.2 E ................ 53 40 S 75 0 E ,21 53"26 .......... S '74' 3'6 E ................. ,4~ .... 257.26 S 1061.63 E 1078.01 :278'15 S 299,1.1 S '320'12. S 341.21 $ 1140,13 E' 1218.36 E 1296.21E 1158.44 1238.67 1318.55 ) 1373.84 E 139~.27 3500.00 3600.00 3700.00 3800.00 3900.00 2888.24 2782.24 55.35 S 74 18 E .28 2948 '21/: ::'~ -: 2842.2£ ............. 52"'43 3008 · 96:::: ~ ::~::?~ 2 $ 02.96 52 8 S 72 42 E .45 025. 0 ...... 52-25 ........ s 72 .... 48'E .............. 362.76 S 1451.30 E 1478.00 384.95S 407.77 S ... ''.'.:.431:1;04 S 1528.17 E 1557.45 1604.25 E 1636.41 l&79.88'E 1715.13 454.49 S 1755.42 4000.00 "-47 oo ~200.00 4300.00 4~00.00 3192.75 3086.75 51 3254.83-':.: .:.3148.83 .......... 51 3316 '8'7 ':.:'.: :::ii:. 3210.87 51 33 79' 01' i?:;::::' .(;::.. 3273 · 01 51 344 t.40 333 ;' 0 ...... 51 46 S 72 2¢ E .72 29 ........ S'72 12'-E .......... ~i ..... 49 S 72 30 i .41 20 S 73 12 E .73 28 ....... S '72 48"E' .... .33 478.08 S 1830.70 E 1872.36 501.92 S :"'/' 525.69 S 548.80 S 5-7'1-T, ~~- 'S 1905.38 'E 1980.12 E 2054,98 E 2'I'~",-W2--K .... 1950.43 2028..53 2106,48 2-I~' 4--,--21~' 4500.00 3503.67 3397.67 4600.00 4700.00 4800.00 4900.00 3566-02...::::.:...:' 3460.02 3628 '-23 i:.'' ::::i ":': 3522.23 36~0.18 3584.18 3753.61 3647 ;-~-i ..... 51 31 S 73 O E .16 51"'2"1 ............ S .... 72' ~2-"~ ................. ~2'8 51 43 S 72 18 E .~8 51 43 S 72 18 E .O1 49 32- S 70 3d'"E ....... 2';59 594.65 S --61 '7;-71 s 641.25 S 665, 12 S 2204.50 E 2262.05 2~79.21. E 233~.84 ~"' 2353.88 E 2417.78 2~28.66 E 2495.95 2501.90 5000.0 5100.0 5200.0 5300.0 5400.0 3817.50 3879.27 3939.51 3999.23 4059.13 3711.50 51 3 S $9 12 E 1.82 716.25 S 3773.27 ........... 52 ..... 38 .......... S-'~'8-'18-' E ...... 1.7~ ...............7~4;76-S 3833.51 53 16 S 67 42 E .79 774.66 S 3893.23 53 24 S 66 36 E .89 805.80 S 3i:)-5'3'~i3 ..... 52-'59 S 66 12 E ......... .52 ......... --~3'7.86 S 2574.11 E 2649.84 2%-~ .9"~'--'27 2"8';'4'$ 2721.39 E 2808.23 2795.30 E 2888.44 2868.67 E--2P6'8'~50----- 5500.0 5700.0 5800.0 "S'g'O'O; o 4119.27 4179.15 4239.04 4299.89 43-6-I-;-3-i ..... q013.27 4073.15 4133.04 4143.89 42'55;3'1 53 A s 66 18 E .11 87o.o4 s. 5'3--22 ..............S" 6'6-- "6- 'E: ...... ,-34 ~O--~-.-~ 6 S 53 2 S 65 6 E .87 935.43 S 52 0 .S 64 48 E 1.07 969,0~ S 52 "13 S' GA .....O"E ........ ~'67 ..........-i"O-03TI3--S 29t~1.80 E 30,48.39 3088.01 E 3208.52 3159.90 E 3287.82 '3"Z31-gqI~-E 3'3 '& G',"'G 5 -GRD (SEC29 TOQN R13W) RADING BAY UNIT .OSS SURWEL TRUE EASURED VERTICAl:. :i.' DEPTH DEPTH NL SPERRY-SUN INC ..................... RECORD'OF SURVEY ......... SUB COURSE COUPSE DOG-LEG · :SEA INCLINATION DIRECTION SEV DATE' 'OF. SuRvEY APRIL VERTICAL· SECTION DIRECTION 29, 1982 BOSS-16012 TVD ............. DEG"MIN DEG REcTANGuLAR COORDINATES VERTICAL ' DE G ! 10 0 ........ N'O'R'TH ?S09J'TH ....... -E'~'STTkFE'S'T'T--' SECTION ..... 6000,00 "~'T~O"JO0 5200,00 6300.00 "g~'OD~"~'O--'-- 4422.73 4316.73 52 0 S - ' 44-E4:; 48 '.~: ..:437'8'";'~8 ........... 51'"44 ....... S 4546.35 .. '::: ~440 .35 51 50 S . . . .A608.4~. ~..:.,~ '4502.4A 51 23 S , ~'~~ .......... ~'5'~5';"I3 ..... 50 ' 5'8 .... S' 63 36 E 63'18'E 62 54 E 62 6 E 61 48"E .38 1037.97 S 3301.87 E 3~A5.43 ............... · 36 ........... T'075,15''$ , 5572;23:.iE------3-52-5';93 ........ ,33 1108,67 S 3442,30 E 3602,31 · 77 11~.87 S 3511,82 E 3680,Afl .............. -49 .......... T~8'1-;-,5'0::'S $'EBU.,-51T-~ ....... 375~";03 ......... 6500.00 ~734.23 4628.23 50 47 S 61 36 6600.00 ~797-;14 6700.00 ~860.78:~';'~':.::~75~o78 ~9 41 S 62 12 6800.00 4927'73' ~'~.: 4821.73 46 13 S 67 6 '~'9~0'~'0'0~~9-9-4~7~'~~,70" 49 39 ..... S'67 '54 .23 .......... · 71' 1.56 5.03 3,49 7000.00 5059.07 4953.07 50 13 S 67 42 ~I'00~0------.~F1-2-2.27 ..... :5D'I'6,'27 ........ 51'"22 S"66'30' 7200.00 5~.18 ' "5078.18 52 8 S 65 ~8 7300.00 5245.53: 51'39.53 52 11 S 65 30 '7~0'0-~00~--53'0-6'787------~'20D"87'" 52 8 S 65'1~ E .5° E 1-;'4'8 E .9~ E .2~ E ..... :"' .1'7 1379,86 S TZFIU;~'2 $ 1441,78 S 147~,3~ S' 1-5'07T2'1 ....S 3992.13 E 4214.3a 4135,32 E 4370.3~ A207.27.E 4449.29 7500.00 5368.23 5262.23 52 10 S 65 12 -7-6 0-0-~' 0'0--- 5-4-'50'76-fi-------5'324 ~'6'A ..... 50' 35 S '63 ' 4'2: 7700.00 5493.761:.~" ':.5387.76 51 8 S 64 7800.00 5557.8~ '.:i.5451.8~ 49 8 S 65' 30 -7900.'0'0 5'-ELr3~-/----551-7;-81 ...... qB 18' S 68 48' E ,08 E-7 -~ 1-;96 E · ,63 E 2.27 'E ' ' 2.'62 15A0.27 S 4350.79 E 'I 57-'5;-95--- S ~-4-2'1 ' 27' ' E ...... .1608'07 S .. 4~,90,92 E' 1640,76 S. ~560,36 E ........... -~5'6~,-9q-~ S ..... q6~ST--E 4607.15 'zf6-85 ;-I'R- 4762.63 4839,31 -q-? T 4-, 43 8000,00 5690.59 558~,59 47 55 S 68 30 -'l~1-0-0~IF0------5'7'~I-~56~51-;-71 .... 47 46 .... S' 68 O' 8200,00 5825.6~+ 5719.6~+ 46 40 S 67 42 8300.00 5894.33 5788.33 q6 34 S 67 .18 -~T4 O-O-;-O'O- 5'9 6 ~ ;-E8----5857~ 68 ....... A5 -'37 ..... S "67 '-24" E .45 1697.0~ S E 1.12 1752.17 S E ,30 1779,98 S E ...... .96 ......... 1~07.-75--S 4698.90 E 4988.8~ 4835.71 E 5136.32 ~902.85 E 5208.99 q~"'9.--'5'~-'E" '52EI%03 ...... 8500.00 6033.83 5927.83 ~5 18 -8GO'O-;O'O--------6-'I-O- .~-~J~ ..... 5998;38 ...... 44 58 " 8700.00 6175.46 6069.46 qq 26. 8800.00 6247.39 61A1.39 43 55 "S'9'O 0 ';UO ......... E32'0';'02 ........ G2'1~'602 ..... 43 $ 66 5A E .q7 1835.40 S S .... 67"' 6 E ...... ;37 1~'63.09-S S 6& 0 E .9A 1891.08 S S 64 q8 E 1,19 1919.99 S S 6~'qg'"E ............. °32 ........... I'9'~r9-~26--S 5035.01 E 5352.30 5~G~,--2LS--E .... 54~3-;'17 ..... 5164.77 E 5~93.49 5227.94 E 5562.93 52~0',--1~--~ ........ 5631-~'6I .... ,,ARATHO. N, OL,I.. CONPANY 3-GRD (SEC29 109N R13W) TRADING BAY UN1T ~OSS SURk~EL qEASURED TRUE '. '" SUB VERTICAL. . SEA DEPTH TVE~ DATE:oF SURVEY APRIL 29, 19~2 , VERTICAL SECTION DIRECTION ............ : ..... BOSS-16012 NL SPERR¥'-SUH INC ....... T ....... ~'EcoRD' oF'SURVEY .......... .. COURSE COURSE DOG-LEG TOTAL .. ':' , INCLINATION DIRECTION SEV RECTANGULAR COORDINATES VERTICAL DEG MIN DEG MIN ' DEG/'I~"D ..... ~'6~~'0¥'~ ......... ~Y?'"~'~¥ ................ S'~TION ............ 9000.00 6393,69 6287,69 A1 50 $ 6~ 2q E 1,~6 9100,00 5~67,37:~6361.,3'77 ......... A3 'i~ ..... S~'65"24"'E ........... 1;'56' , . 9200,00 6539'68::. ,,"6433.68 ~ 8 S 65 30 E ,90 g300,O0 6611'61':'?'::i'6505,61 ~3 52 S 65 ~ E ,34 1978.25 S 5351.21 E 5699.16 2006.:92 S .' 5~12'62 E, ~.' 57~6.71 '2035'62 S 206A,26 $~ 2092.88 S 9500,00 6756,36 6650,36 43 50 --9600 OD 6827,92:..:':':.~:::...6721,92 ........ 44 46 · . . ':.. ..:.: · . 9700.00 98OO.0O 6899 ' 2'9.:. ::L:::' : .;.: ,..::;::. 6.793' 29 44 I 0 ~q. 20 7042,48 693 ~,~"4'~ ............ A~ 17 s"65 ..... Z~'E ............ '9'8 S 64 36 E .78 S 64 36 E ...... s 6~'~2'E ....... .08-' 2121.99 S 566,3.90 E 6043.1q . 2151,39 :S:::: ..5727,25 E ';!2181"05".$'::' ;':;.'":i 5790,71 E ':'2210.97' S ' 5853,73 E 2240.88 S 5916.86 E · ' '6112.94 6182.93 6252'6,4 6322 .¥3 .... !.0000,00 10100.00 10200.00 10~00.00 £6-,+oo.oo 711A.33 7008.33 43 51 7186,57'.;.::.-..7080"5~ ............ 43'-38 · ... . · 7258-5~:':":"::L7'152,5~ 4A 19 7350.00I 722~,00 44 2~ 7401.43 729~';'4'3 .... 44' 22 S 6~ 12 E ,56 S 63 30 E .67 S 63 12 E .26 S 63 '6 E ..... 2270,88 S 597'9,61 E 2~-01-;41 s .- 60ql,65 E 2332,4q. S 610~,76 E 2563,81 S 6166,28 E 2 5 95.42 S 6 6391.91 6530.2q 6600.03 6669.85 10500.00 10600.00 10700.00 10800.00 2427,25 'S 6291.05 E 6739.66 2~59,29 S · 2491.~6 S 2524,14 S 2557.30 S 6353-26 E 6809-4.3 6415.06 E 6878.88 6476.64 E 6948.,35 65-~'7 ;'-g~--£ ......... 7'{Ji 7 · 62'~ 11000.00 7831.98 11100.00 7905,16 11200.00 7~79.15 11300.00 8054.42 tl~O0.O0 8131.08 7725,98 A5 18 S 59 5~- E 1.].0 2591,12 S 787.'3.13 41 58 S 60 0 E .73 2658.38 S 7948.~2 40 20 S 59 24 E 1.69 2691.57 S R025.'6'~- ...... '39'-'3'A "- S' 60 "16-E .......... ,9-6 2723.82 S 6597,88 E 7086,08 6 65-TT'0-I-'"E ' ' 1'1'53.--'/4. 6715,A4 E 7220,55 6772,25 E 7285,80 6827.76 E 7349.q9 11500.00 8208.67 11600,00 ,-:. 8287,18- 11700,00 8.~66,83 11800.00 ~7.88 l-i '9-0 d-',"ij'og'.q'3 o. 11 ........... 2755,O7 S 2-7-~5. A ~ s · 2814..88 S 284.3,93 S 6882.56 E 7412.13 _ 6 93-~~ E .... 7~'7'~ ;-6 8 6989.53 E 7533.77 70q0.18 E 7591.91 .... 7 'O"8-9';35-T----TEZF8 ';-55 '-~ IARATHqN. Oi'F COMPAN'¥ )-GRD (SEC29 TOgN R13W) 'RADING BAY UNIT . XLASKA 30SS SURWEL TRUE IEASURED VERTICA~ '-DEPTH D"EPTlq SUE SEA TV D VERTICAL :,'SECTION DIRECTION 29, 1982 , NL SPERRY-SUN INC ............................ RECOR'D"'OF-"SURVEY ......... .. COURSE COURSE DOG-LEG '" TOTAL . INCLINATION DIRECTION SEV RECTANGULAR COORDINATES DEG'MIN ......... DEG'MI'N ..... DEG'II"O'O--'N'O~TH'TSOUTH'--"E~S-FT~ES3 ..... BOSS-16012 VERTICAL SECTION L2000,O0 86 F21-O'OTO-O- : 8'6 2200,00 87 .2300,00 88 2-~ O0-;'-O-O .... 8 ~) 13,15 8507,15 33 35 S 59 48 96,~9:...~ 859'0';~99 .............. 32"28 ...................... S ..... 60 ..... 81.59 :-.8675,57 31 58 S 60 AP 67.01 8761.01 30 40 S 60 36 5'5',7~-' 8947.74 .... 29 2 .................. S' 59 36 E .57 2900,58 S E ............ 1";'1'~ ...... 2927,8z-$ E .62 295~.17 S E 1.3~ 2979.60 S E ' 1"69 ........... '-3-0~4~','~0-S 7137,51E 7703,63 il-B'Zl;.--6~ b .... ~YS?,~O ...... 7231,06 5 7810,66 7276.39 E 7862,31 T'3T~,"5~ ~ 7~I"~'7~ .... L2500.00 904.1,52 8935,52 27oo.oo 9219.75 i:i.':i L2800.00 9310.08 . 9204.08 L-29-O-DTD-O ....... 9A o i-.'i-A'" ': "92V5%"i'4 - ' 28 12. S 59 26 59 ............. S'59 25 A1 S 59 25 7 S 59 23 41 ..... .' S 5'9 fl E .89 3028.85 S 6'E ........ I';'21 Y'052,67/$ 18 E 1.30 30.75,39 S A2 E .60 .309:7.16 S ~ E' 1;~'5 ............ ~II'IT~2~'~ 7360,72 E 7959,16 7'4~U*"45'E-- --8'~3 7438.55 E 8048.98 7475.51 E 8091.~9 T5/T~5--E ..... 8I~2';'~3 ....... · .3000,00 9493,38 9387,3~ 21 i~"l-O"O-;', O'-O - ~ 9586':99::i :::i::.:':..<:.-9"'4-'8-0g'9-9.' .......... '1..' 9 .5200 o00 .9681:' 7'0 <!::i!<:.i>:i::::'9575- 70 18 L 3300 · 00 · 9776,927 ':.::: :: ]'::..96'70 ' 92 17 43 S 57 12 23 ............. S"56 1'8' 2 S 54 48 32 S 52.30 "53 "S"52"'12 E 2.09 3138.58 S 'E ........ 2.~5 . 31:57; 82: -$ ..' . ~ 1.A4" . ...' 3175".95 S ":' E .86 '.31.9~"04. S E' ......... ~6'G" 3212'i2 S 7543,82 E 8170,5q ! ~ 7'3';-1'9--'E---82-D5';-0 '8"~ 7599.6~'E 8236,51 762~.2A~ E " 8256,21 76-4'7'; ES--E- ...... 82~. ZF ;-8 ~ 13500,00 [-3'EO-O "0'o L3700,00 9968.q. 3 9862.43 15 10064. · .75: .:' .; ". 9--9"5'8-; 75 ............. 15 1 o 16 z :11'.0. 0 5 5- 3 9 t ,+ TH E-~-A-t.-C-~'-K'F I 0 N'S'-" A R .-" BASED 39 S 5~ 42 E 1.42 3228.82 ' 31 ........... S .... 52 ....... 6 'E'-: ........... '15 S 52 36 E 1.28 3260.52 7670.16 E 8322,05 T69]e7~"-E .... 7712.06 -E 8372.99 - ON.THE 'TRAPEZOI'DAL"OR AVS'; · HORIZONTAL DISPLACEMENT = : :.' START OF SURVEY . . 8372,99 FEET' AT SOUTH 67 DEG, 5 MIN, EAST (TRUE) WAS 106.00 FEET ABOVE SEA LEVEL May 5, 1982 Mr. Ken Thcma Marathon Oil Company P. O. Box 2380 Anchorage, Alaska 99502 Re: Our Boss Gyroscopic Survey Job Nos. Boss-16980/16012 Well: D-6 RD (SEC06 T08N R13W) Trading. Bay Unit Kenai, Alaska Survey Date: April 30, 1982 Operator: Marvin Milam Please find enclosed the "Original" and twelve (12) copies of our Boss Gyroscopic Multishot Directional Survey on the above well. This survey is a combination of Boss gyro data from Job No. Boss- 16980 dated March 7, 1982 and Job No. Boss-16012 dated April 30, 1982. Each folder presents the survey in Radius of Curvature, Average An~g!e, Tangential, and .Trapezoidal Calculations. ..... Thank you for giving us this ~pportunity to be of service. . Sincerely, ... KB/pr NL SPERRY-SUN, INC. Ken Broussard District Manager : Enclosures REC'EIVEI) MAY 1 9 1982 u. 4, Gas Cons. Commission lmchorags ,F ERR'~ --.= _ I 1 WE IARATHOIq f..]~IL. CCIMPANY [= GF<D ( ......... '"-' . .~,E{...~.:= .... TO'.:.>N F~i.:;[,'l,,J) ......................................... COMF'UTATtON DATE- RAEING BAY UNIT MAY ('h?, .1.':~h:::'2 t L A'.F.;I.::.'A. ]ERTICAL S[-.TC]-IL]N CALCULATED ALONG CLOSLIRE .L E;I...IRVEYING C:OMI='ANY ,.% ,.. -...- -;~AGF2 -~Lr..t.-,i...A DATE OF SURVE:.Y AF'RIL ......... BOSS GYROSCOF'IC- SURVEY ........... ,JOB IqLIM].:'{ER BOF;S- ..... 1 601 ~'"' I..'::E L [. Y B 1_! SI'-.I I N G E L E V. = 10 6.0 () F'F. ....................... OF:'ER A'f' OR..- h'i I L.A M ................................................ .TRUE -.- ~::,L B-oEA F:AI iR:gE L.U.,IR.:.[.:. 'iEAE;LIRED VERT i CAL VEt< F I' _.~-~L:[ NCI_ I NAT I ON D I I:;~EC'f' .I: ON .E=I- 'f H DEF'TH £ EF TH FJEG I"I I N r.'EZC.~RE!iT.'.F; DOG..-.LEG i-, "~ I ..... i ,':,E Vt:I-, I TY DEG / 100 0 0.00 .- 106.00 I 0 () _1. 00, 00 - 6.00 ...... 200 .... 200,.00 .............. ~,T, 00 300 300. O0 1~4. O0 400 400.00 . 2 94.00 ........... 500 .......... ~ CtO." Z) Q.. L '_. _. ::3.f~4 ,_00 600 599.99 493, 700 699 99 ~,v.:, 9 ....... E',O0 ....... 77P,.97 ............... 6?3,97 _ 900 oo,:, - - ,:, ~ ~-. 84 7 yb:. 84. i 000 999.4:3 89:3.4:3 ....... 11.00. 1098, =5 ,-,c,,-, ....... ~ ............ ~'. ~, ~ ~. ~ 1300 1294.91 11,:,'-' ,_,':'. 9. 1 ..... 1400 ...... 1391.12 ......... 1285. i2 1500 14o.. 73 1379 73 1600 1578, 6o 1472, ....... :L700 180 0 1900 2000 ..... °1(]0 '2200 166.,?. 72 .......1563..72 . 1 TM 61 16.'-]2 6.1 / ._l,'-, · .. 1 :::4.5.04. 17.'_::'F~. 04. l ":,~'-"-' =' .... :..~c~ ..,.,Zl- 1:322 54 2:008.80 i '.:;'02.80 · --: ' ,-m ~.. ..- 0 c, z,. 6:5: 1979.6 ..... 2300 ..... '215'.:.;'.._37 ....... '.';:053.39 ......... 4.3 _39. 2400 2230. i '-..-' '2124.12 46 18 25 O0 2297.7:3 21 ':.? 1.7:1: 4 :_=::3 2/-,0,:'~-.. 2361 12 . ..-.~._,,.,'-"-'==. 12 ='-' ,'-Ti ...... ~ ........ .~,~ - - '-' '-' ') _ 2:3 _ ;z700 z4.,:t. 2o 14.20 .s4 ._ i 2 :_--: 00 2478.01 2372.01 54 30 2':.?00 '=-'~':;':'~ 6:--~2429.6,8 ..,._,=~':' 2 i';- o L77.. 10 '-' 7/-, 19 -22' ':' 76 1.0 /.:,. 60 ':' 75 :=:0 S ' -""': ,, .,_,./2,0 -,- ]"OI"AL ........... REC'TANGLILAR CCIORD I NATES VERT I C:AL I',IOR'I'H/.':;r'I! II"H EAST. WE:.:,T E;EC]'I _. _ O. 00 0.04 S 0.0,I. '-' O, 05 bt 0.02 :=; ............. O, 4.3. S 1,02 1.93 S ....... 3-,77 S 6,06 F-:; 7,03 '.=; ....... 7..39 S 9.59 1::::. 95 S '""(' (')2 '::' .~:: .).. ._, 27. -1-7 S 36.04 S ' O. O0 O. 0 0 O. 03 W -0.0 i · - O. 16 .W ................ 0..-13 .......... 0.44 W -0 · .'-'f. 2 O. 33 W -0.,:~0 .... 0,,0-7.. W ............ O. !0 ............... 0.09 E 0.4. G', 0.2F: E 1.0 i 1 02 E '" 4.1 5. 10 E 7.06 14.01 E 1.5.64 .,::./..1. 0 E- .......... 2'-/-..84 .............. 4:3..'2:'7 F' 4:3 · /-_,._,':'. f.;' 8 E 90.531. E ........... 91.. J. 2.1.. 9':.-" 1 r:';'7 84. E I_ ='-"',, _ · ..,~ . -'1.1 .4.=, 70 '-' -" _. -.:,' ..... 1 '-.':-:. 06, F,__.,/-, Y"";.. 1 ._,":' :242..,.,'=__ '= · .:,.~: :::; 291_. 4 0 :::0 9.,-' "" :=:44 '"' "- _ . '- -: .... · ;Y 0 94. :2::3 '.E; 40:5:. 0/t ~24 Al. c. 53~ ~3 .. m . ~. --- 14.0. :3,q.S 5'2'2.90 157. 'P 8 '.E; 67 ~. 4- ~ ~76. '== c. 746.-4z-, ._I %j ~i - - · 196.27 o"" 824 .67 2~ 6.4-3 c'._, 90:3 , ~4, 2:36.60 S 9E:2, 90 E ...... 200, 2:? ........... ..' 4.._,. 4. E.--, I,%'" E 2'-.?F;. 0 I E - -:2:49. '-~'~' _. .,--..= .... E 4. 70.96 E ......... 5 ::: 7 · 50 IAIRAI'HCIIq CIIL F:ONF:'ANY ~-6, RD (SEC2'.-.-' T()gN R13W) 'RADZNG BAY UNIT ~ I_ A'..:.;I.':: A ;ERTICAL :.:; E c: 'r l o r, l C:ALCULATED ALONG CLF]E;LIF;E .: .... ' -'-"' '"" I bJffl~[_ '-" ,r.,~ ,,-y . ,FE:I'~I'~,'-.::,LN ~ .z,,_,,, ~,z lNG CAMF'ANY AI'.IC:HrIi-.-?A GE ALAF:;KA (:301"1F'I_i'~'A T I 0 N D ATE MAY 0:_::., 1 'FIE:::..' : .... ! D A T E 0 F '..':;I Jl'? V E Y A F' R i L 29, .1. '2 L:~ 2 BOSS GYROSCC~F'IC. SURVEY ,JOB NLIHBER BCd::;F;-- 160:I 2 KELLY BUSHING ELEV, = I06.00 F::' ...... OPERA'TOR-M. I LAM TRUE E:LIB-SEA L. jLIR._-,E: 1EA.:,URED VERT I C:AL VERT I CAL I hlC:L I NA'F l ON :~Er:"FH DEF'TH !]EPTH .OEG N I N C C'f U R.'.'.-.'; E: Ii 0 f."..~ - I_ E G DIRECTI(]N " .......... ' · 2 E V [:: I.-~ :[ T Y I3 E G R E:' E S D E G 110 ~.:~ T'OTAL ............ I.-, EL, i ANL: IJLAI.~ F:f]F F:'D INA TE.:, VEl:Ti' I C:AL IqC~RTH/SOLITH EAST/WEST ::;EC]'i :3100 :3:200 3900 3400 3500 3600 :'::700 3:.:_:0C) 390C) 4000 4100. 4:2 o 0 4.'_--:Cx) 4400 4500 4/:,00 .... 470O 4:'--:00 4900 5000 5100 5200 ,'.' '. -, .,., '24 ':"-"- ":"=;,7 '-'C ._,.2 ._ 4 1 ..., '.S /.::, 0 ~'' . IZ (') ,,- ..., ,.:, ..) ..'--'/- ~'.i_,._ 1. ,:,'-',:,'"" ........ ....-,,..-,~ ~._, +._, ,_,c,,:,,_, "5 z.1. 22 S 75 19 E 0:21 ..:'-'-'7,:, . 18 2710 .=;.s, 2604,5:2 =;':' ,.':I-::; S .7'J- :"-':0 E 0 66 ":"::¢'-:) 14 · -' F '-' =:;":, ' ..... ,'-, -) 2769 6,7 z6=,.:,.67 40' ::, 75 0 E () 21 · . . , ..:,...t 15 · ::, c, .-., ,.-, O 7 ": .... "-' 07 ~":' :::"6, '-' 74 6 O E O 40 :341. .... .~:"4 ,' / .~'- .,.5 · .. -.., . . . · -,,-,,-,,-, = o7o-:., p;a ' F;5: E; ':'/'":'. 79_ ,~.,:.,:,,:,,. ,4 ' ' ~...~. ,. ,., ~., ..._ ~,. ......:34 .... 74:30 E O ":' c, . . -' .... m .., · *' f-' .........,~.,.' · ',o,~,-, 51 2:.".-:4:.2 .=,, .=,'-"4:::: · -' .'. -,,:,. . :-':; 7 :':: 50 E 1 0'7 ""'" .... :,,z, 4 · 9 :300'-:,'. 26 ..... 2'-7,,('):::.. 26 S'2...27 ,.,o 7:3 . i0 E 0 .4i 4.07. :::c) :3070, 42 296, 4 42 !=,2 '::' '-' · :.:, 72 /-,9 E 0 4.5 431 07 · - ~_1 ...... .... . · ........ :31 '-' .=;'-.' ,:, 1.6, C) :::_ (].,__'7.=i-, · 6, 0 ._~. 24. :: : . S .7 ::.:.' ,80 E! C) . .."'",:,'-' 4.5_ 4. , ,. ,..=;'::' :31'-'--' /.~ 478.1 i :/._, 05 :3087 · ' ='- 45 "'- ' - · 0.:, ."51 ::5.7~. :::9 E 0, -'":' '-"-'.~' ~ '-' ~i .... · :, ..',_ ._, ._. ~._-,: ....... :31.49 1 .'.5": 51 ....... 25~.__': ':.i:. :S :: 72,.. 19 E C). '-'1 .........................,:, 01 ,-.Y 5 ':":'17 17 :_::211 1'7 N 4o ':' 72.5C) E · _ I 0.40 '=;"" · -~ .-' · · .. · _ ~._,. 7:_--: :"::37'P ...... :--: 1 3273, 7: f 51 2(:) S 7:3. 1 ':~ E 0, 7:':: 'fi4,:,'-', 8:3 .....2441 7 O ':":' :3 = 7(') =:, 1 .._ 27 "-'.:,. 72. :3 C) E 0, :':::':: 571 6,'-' · _1 . _ _ · .,.! ...i · . -. · -, r...- - .-, .':' / · . ,, . . .= .... t).:,· '-'-' :3:397.97 51 2_ O. ._,'::' 7:3. 0 E 0 16, 5'94 /'-, 9 :3566 '-"-' · :, ..' 34/-,(') :32 .~'; 1 :':21 :F; 72.6, 9 E 0 ""'-' 6,1 '7 '74 . _ . ,, _ . · .-',:, · 3/-2':: ='-' ':' F;-,':' ":' .=;-,':' 51 .4-2 :E: 72 :::0 E C) 4.6: 641 25' .... ~.l · l_ Ii ....I.~1 ,_,.,_ ," _,-_ · ,_ ...l - - m .... i · 3/-, 90,4'P :3 5 E: 4, 4'.T/ -'= .. .... 1 /!,-:':: S 72. :30 E O. 0 O 6 E, Ei · 1 !5 375:3.92 :3647.92 4-':.-; :3:1 :S 7C). 5(:) E '2.59 6:_::'F/. 78 ...........:E: 817 · 81 ....... 3.7i 1. · b: 1 .....51 3 .:.,'-' e, ;' 19 E 1 ~dZ-"- 716 .... 2 q'/ 3:=-.:79. ~°.- ,-, :--:77:3 ,5:::_ =":'"._, ~. ._,':"-',:, .:,'-' 68 · :::0 E 1 · 74. 74.4, 79 3 '-7 :'=: 9 8:3 :5:,'3:32 '-' '-' ....... :,.z, 5:2: 16, .'.:; 67.69 E C). 79 774. 6,9 · =;30(3 3?99,54 ...... ':">""':' =' ...... ................. ,.-,:.',.,, ...,4 ........ 5~:: .._ '.."~...5 ~4(')C) 4o:=i-,o 45 '-":/:"-' 45 -"" ,:, .'- · ,.z, 5.-' .=,':~ ':' ...... · . _ · ._ .. · _,._, 0 L) 4-11 ':/ F; 9 4 A 13 F, 9 4- c; .- · -- . _ · _ . ._ ._, ..._ ..... ,5/-_,C)C) ....... ~ 17.9, 46 ....... 4073, 46 ....... 53 .... 22 ...... 5'; 5700 z .-,.-,,-, :]- ..- ,:, ~. 5:/-, 4.1 '-' '-' 36 p;.:, -':, o - - -,.3 .-~, · ._ -_, .' ._, 66.60 _E ...... O. ,'.-.-.-:9 6./-, .19 E 0 ='-' _ · . · ._1.~. 6,6,. :_--:0 E C)..1. 1 . ~,6,,. 10-E .............. 0,34 65.10 E O, 87 ~, .:, (.) 0 4300 · '20 5900 ....... 4. 361.,. 62 __ ..805,84 837.E:'? 870.07 902.39. .- 935.47 4194.2(:) 52 0 ::-: /:,4. :30 F' 1.07 969. O 7 '-'%'= F, ":'. ..-'._._,..62 . ..,. ....... 12 E;...~A4. ........ 0-E- O. 67 ........... 1-003.17 :; 106.1. -"-' . /,:, E 107:::: 17 114() '-"-' . ":-';'" _ _ . . .' ,:, E J. 1 ._ ,:,./-, .... 1218.5i Er- 1238.82 1296, o/. E. 1:31':' 71 · ._* _1 ,_1. 1 .:, 7..:,. 99 E 1 '::':> :q. 42 _i4.51 ..45. E ...... 1478.1~:..., ......... 1 Pi'-"'::' :--: 2 E 1 F, · ..._1/~ . 1 E,O 4.40 E i 6.:3,::,. i/'""c':.:,o., 03 E 171= 28. · . .. ,..I · ........... 1 -"~"" ~':i' , . . / ._ ._,.._ 7 E 17'P::: 9 1',-'-~30. E:5 E 1872. 1905. ='-' .,~ E 1950 .-':'-' 1 'P :'---', C) . 2'7 E202:E:. 6:::: · --m" ~:.'" · -'. 0 o._, 1:3 '.;' ! '..--'9 o E: 7. E. - 7' 18 4.3 d ....... 22c)4 A5 E: '-"-'/-'-' . · .....-:,..-. 2'1 2279:36 E -:,.:,.:,,:~ · · "1 .'"~ · -.',o,_,4.03 E 5::417.94 ..... '-' '-"-' 1 E 2496. · " 4 .-" ,:,· ,_,'"" .. _ ~ - '--' ~..{ ~ .-, 2.50;7-: (')7E .,:._,'.:,. · '~1:-' ''"'~ -%,/. K..-' ,:o/4 5:7 [-'. ........ . . . 2647.55 E z7..:.:, 2721, ~...:, ='' E ...... '2',:: 27"-?.=;',,47 E '-'""'-"-' Al--- . .. 2A6:::, 84 E :2'.-.? 68, c", 7 2:'P41 · 97 E 5:048, 56 · :3 C) 1 F, · '-' =' ....... z.::, . E :31 -'28 · .6 4 ...... :ia)F:;-':, 17 E 32O8, 69 ._,":'160. · 06 E :'--:2:5:7 ,99.. '-"-"-' , ~.' ,'.,.. E ::::::t-.F-.. ::-: 1 .:,FEr-,~Y-SLIN WELL '...-.:11RUEYING CCIMF'ANY AI',IC:HORAGE ALASI<A [ARATHC~N OIL C:(]MF'ANY ~--E,F,:I] (:.:.;EC2'P .'T'O'.:.;'N R13W) ...... COMPUTATION DATE 'RAIl .1. NG BAY LIN I T MAY (:)3., .1. 982 d._ASKA : ,'ERTICA[. ::;E:CTION CALCULATED ~I_ONG C:LO'.::.;URE PAGE 3- I]ATE OF SURVEY APRIL 2'::'., 19::::2 BOSS GYROSCOF'IC SURVEY ....... ' ....... ,.IOB NUMBER BOSS-16012 KELLY BLISHING ELEV, = I0,":,, O0 F'T', ........ OPIERATOR-.M I LAM ................ TRUE ,"l' ,-' _ . ................... ;=,L B-oEA .... CCIURSE.. '~EASURED VERTICAL VERTICAL INC:L INAT ICoN )EF"r'H £ EF TH DEPTH DEG M I Iq . A (] 0 (] 44 '"'-' .......:: .:,, O.._, '= 4:317.05 =,~"" 0 6100 4. 4':'4 :::0 ~ ~'.7''' E:O 51 43 .. ~_~ · ~ ... ~' .2,. ~=~ ~ 6200 4546.. c,: ...... 4440 66 1 50- -. ....... .75 4._U~./._ ' ~' 4 .:, 6.:,, 45 5 (] 6600 6,7C) C) .... 6:E:OC~ /_-, :':..' 00 7000 ...... 7100 7200 7300 7/1. f') (') 7500 7600 ....... 7700 7800 7900 8000 81 O0 ::: '7, F) .. 8:300 E: 400 ,:.._, tl (.) ::-:700 880C~ 47'.'.-:"7.46 4691,4 ,'.":, 4.:5:,_', 1.10 4755.10 ,.'i ,..-,, .":, c, (-),::.) '"Icl'":"'-' 0':.-" 1'.' _L ,_, · ........ 4':'.:'95.08 4.8L::',:,'. 08 · 5OD'?. 45 ' 4953.4-5 · _'5,..:1.22 ..65 .......... 501/.:,. F;'-',4 '=; 'T,' 3. ._ .l ..:, :. '~.:-' 1 ._ ... _.._ . . ~-', .-,,_-.,,. 5:z:07, 2._-"5 .......... ..520.1. · 25 5.'..:.:68.61 5262 · 61 · _, 4 .:, 1 0:2_' .=, ':"--' ~'= 02 # ._ ._, .~ ._1 · 5494 · 1.4. 53:5:8.14 5558.22 5452.22 56,2,'-1- '-'c ':..' = . ,. _) .,.,_ _ 18.2..c) 56,'PC). '~:E: 55::::4. ':.-:::2: · _,7 .... =,. 11 .... . ,'-,. ,~. i 1 ...H '-',:, ..- c,'-", 04 57 "::,' 0, 04 [2" ~-,,.--t/! --? .-~ .... ._,,-, :.. ~. ,. / ..:, F'i'7 ::~ ::: 7:2: 59/_-,4 0'2: ='-'-'='-' · ._-z,._,,z,. /-.(] ::: 4 2:3 =" '- '-"-' 2 :E: .... · -_l ::/ ..' ,-, ,, r-, 104 78 ..... :' '"""" · . ._, 7 :., o · '78 /_-, 175,86 6,069,, :E:6 6247,7?' ,i', .1. 4..1., 7? ,1,:E:20 · 4.2 ,!,214 · 4-2 .-"5,:I. 4'? 4.1 4.6, .. 12 4. 9 '::; r) 1 '":' 51 . ':,'2 52 '7 ~.-., E-' '--J ~., ,_1 .-' ,-,. 52 9 5¢) '-'= '-1-9 8 48 .1.",':': 47 "]...'2-:; . 46 :"::'? 4/_', :34- 4.5 :':':6 44 57 '14. '25 4:':',:2,'4 4.:2: 15 Ci9 i.,.1F;: t:} IE D I R E C T ! (] N DE'-C~REES :-]; 6,3.60 :::!; 6:3. :3C) ,.:, ,:. /- .s, 1 c) · .,':' 61 . E:C) "' 61 /_-,0 .:, 6'2, :3c~ ':' 62 1':) ':' 6,7 10 '::' /_-, 7. F:'9 S 6,7. ,S9 .. 66 · 50.. 6r-~ 80 ._65.30 ,._,. 19 :':' /-, ,-7.' .&,fi.. 10 6, 5.50 68. L:: C) .. 6::::.o ~' .... 68. 0 67. E 67 '-" · 6. 7. :39 66. 6'7.10 66. 0 6,::I.. 80 ./:,4.. 80 E E E E E-, E E E E E. .. ::. ;- 3' s7 E E E E E. · DOG--i_EG .... · :, E k I::: I'", I T Y Et E G / 100 TOTAL RECTANGULAI? COORD I NA]"E~:; VERT I CAL IqORTH / :.30LIT Ft EAST / WEST SEC:T I ON C), :3',F: 1 ' "'"' . (.)..:,,:, O1 '.::: :3"'¢'-' . . · .:. u: 0:'-.: E :3,1. 45 ,1. C) 0 ':'/- 107:2: i 6, S ':": .... ' :::'--.? · _,,-, 7...--... E 35'24, n'-:;' m ~.~,., · . . . 0 ':'":' -~ 1' '-' '-' U,=,. 71.S ,:,442, 4. A E 3l-.02,47 0.77 114. 4 .9 () ':'._, :3511 . ~¢. 9. E 5:_/-,_ 80., 61 0 zp:.-, 11 54 S 20 E: 1 · · ..:' .... :,., 74 E .~ i218 2:1 ............ =, 3649 05 E '"'"'"= ...... .:,,:, · "F, ':' :36 0· 7 t 1 .,:._ 4 ..... 7 S :L:: 71 '7.6 .., = E :::91 '-" 1 5/-, 1":":' '-"~'-'=' ~...~t~ '/7 S ...... .:, / c,,-,. 90 E :E: 9:E: 9, 70 ~.,. t)2: i'::":'":' Z' '-'" .... '"'"='-' '9'-' -EE '..'1.063 :::'I. "' ':":' 05 o. 49 1 ':'~:~ 1 01 E; ':":;'":' 1 50 E 41 ...... · ._l._ m . 0 · 5~. '-.?.1:37 'i? .9 ...... '4 ~s; ::: ':..)9 '2 · ":: ,/-, ~ 421,1. · ._5 '-',:, ..1,48 ...... 1410. Of: S . 40.63.73 E 42'P2,0~ ............. ,c:) 94 1441 84 S 41 :'::5. "4 ~-:' ...... , E 4 :::7 C). 5:--: O, '7:4. _1_ 4. 74 · 40 F:: 42(":, 7,5C) E 4- 4.49.53 O,, 16 150'7 . ":"--.'.-.,..:, S 4:27':..), 31 E - 4528, 4'7 .... ,g. 0 :::_ 154. 0, ..:, 4 S 4. :35 :l. (.') ,-'-' E 4607. :39 1 · 96 :l !574, (') 1 S 4-/4.21,49 E ,-1. 6:35 · 42 0,63 .1. 60 E:. 14 :.3 44-9' ~ · :t 5 E .- 4. 7 <':,2, ::.) ./: .... o.-~ o ~_- .r - .,.:, 27 'l/.,_ '"1. ()... ,..,._,c' .':, ,.s; 4 ._, o (.]' · Pi .... :::: E ,'-I- A :3 '? ..,.,":'_ ":_ 2. ,1, 2 16, 7 0.01 S 4. 6, :29. :31 E 4914., 6,'2' 0. ,:'I. 5 1 ,'!,'P 7, 11 S 4-699. 14 E - 4':--' :39.0 ',B --. 0.4-0 1724. ._'7,_,':' :s; _._~ 7 ,,'-_, 7. · 'p 8 E 50/-,_ :::_. 1 'P 1 12 1 .... ="-' z,-,.-.,-- 95 '='l:qA "'-~/-. . / ._,.,,:. :2 4 '3 :]-,:, ..:,._,. E ..... ._ ,_ 0 30 17E:O. 05 S 4'P03.0':',' E --.':':"-',.,,: ~.~" '-.-.,' '-"-' ,, 0,_ o.../'..., 1:3 ()'7 · :30. .:,'-' 4 0 4 7 1 '-"-' ~'' 4 7 ,.5; ,..,.:,._, E ="-' ~-- "" ,.-., .z, --, · ~:~ ......... : ..... .", 5':].' 0. :'3 7 l :F: 6 ;3 16 '-' ._,~':: 10 0 4 9 E --:= :,-:' .-.:"" . ::.'-' · 41 . ,. · -;,~,~ - .- · - _ O. ¢'.<~.., .. 1 :--: 91 · 1 Fi_ ._,c. .=:_ 165 .01 E D 49:3 · 74 1 · :Lg. i920 · 0/-, ...... S .. ~..~,:,, 18 E Pl.=i/-,:::, 1°,_, 0 '-'":' 9/4. 9. :32 '" ~- '"' . .:,,. 1 S 5:2-'90.37 IE . ..,,:,::. 1. :36 .......... 'IARA'TI.-.~Cd~. OIL COMPANY }-,!,RD (SEC2'? TOgN .R13W) FRAI:)ING DAY LINIT :'., L A L:.;I-::.'~ · :,F E:, ,,I,. Y'-..:,L hi l-tELL '.3LIF:;,'VEY l I',IG F:f'INI::'ANY Ab. ICHC~RAGE ALA'.E;KA COMF'IJTA'r']'ON. DATE- - MAY c'-, .L.::, ~ ~ '''-'~..- :., ..~':::' '":' 71.'-:RTIC:AI_ L:;IECTION C!ALF:LLATIED ALOI,,IG CLOSLII:~E ,BA"I'IE CIF '.~;LIF:;,'VEY At::'R'[I_ BOSS ' G'YF~OSCOPI C SI...IF-"4VEY ,JOB NLIMBER BO:SS-160 i2 KELLY B1JS.;HING ELEV, OF'EI:.?A T OR.--.M I I_AH ]'RL!E SLIB-SEA C:OLIRSE 'fEAL--:L.IF~ED ' '"" ' ... ¥, I::.R T ~' CAI._ VERT I CAL I hlCL ! NAT :[ f]iq :) E F' T H _FI E F' T H D E F' ]' H EI E L'ii Iff I Iq 'i? 0 (')0 /-, :':;:'.? 4., ('~ 'i."/ 9100 6467,77 920 0 ,'.':, 540, 0 7 ! 9:300 o6.1. 2. O0 '? 4 00 6684, :2: 6' '.:.:' 50 0 6 756.7 5 9 6 () 0 /", 82 :'"~: ""'"' - 9 70 0 6 L--: 9':-/. 6 L:: 9:3 Ct 0 6 9'71 '-'"' .... . ..:, .,..'_ 99 Ct 0 70,12 · :--: :[ 0 o 00 '7114, 7:3 I Ct .1. 00 7 ! :::,':,. 97 . 1 ('.] 2 0 (3 7 ',~_' Y5 :_--:. '.T/:E 10:3 CI 0 7:2:30, 4. 0 104. Ct 0 7401, :--::3 105 00 74 7:3 '-' =' 106,':"~ 0 75 .,I- 4.70 I c~70,."~ 7,5, I/-, "' '" ......... ,, '"T-". t o_ ,_,':' o. o_ 76, ',:-: 8 . i ~ 10'POC~ 7759. '? 1 i 1 c)00 78:32. :":= 7 1 11 O0 7F,'c)5.55 112 o o 75;'7 !..-.' '---'-' 113 OD :3 c.~ 54. L:', 2 I 1400 :.:.: i :B 1 · 48 .! 1500 ::?: 2 C:'P. 07 1 1 ,'-, C: (3 :3 2:3 7.5 7 :I 1 7 0 0 8:3 6 7.2:3 1 1:3 0 0 8'I- 4 C-:. 2 C-: 1 1 ,::... cl.. A. :z: !5 5: 0. ._~ 1 cc .::,,..-.,,:, 0':? 41 ,I 9 6, :2:61.77 4:3 .1. 4 6,4:'-':4 o7 44 '-' 6. 506, 0 0 4:3 52 ...... -, - , q.:-q ..-.,= e:, ;..'.'~ / ,'-',, :.:~t.., .. 4:L 6650, 75 4:3 4. 9 6722.._,":":'.,:_ 44 46, /-,7'-7,'::: /- ':' 44 9 6. ::-': 6, 5. ::'. 2 44 i'if/ f/.,-' ,7,/,7. ~, -' . :::,c, 4 4 17 700 :--:, 7 j: 43 ._,~': 1 708Ct, 97 4-:3 38 7 t 5 ':.'-_' ,, ';.-.; ::: 44 J. 8 / .,::.,::,-.1., 4. 0 44 27 7 '--' ,"5 t:L' -- -- · ~;:._,~ ,'::::: 44 ""'-' :::/-, 7 '-' ~:' 4 .... · -'.J 4 28 74 :.] 8.7 Ct 44 19 ¥ 51_ 0 ,, 4-:3 . 44 c;. 7?,'_32. 1:1_ 44 :2:."1. 76 5:3, 9 ~ 4 :--:4-:9 '7726, :2,7 4:'q 18 ~ ~ :, :. ....... , 4:2 :37 78 77:. 5:2_' 4. ~ 58 "Y ,~'/ /; -4o,c,'-"-'..' 40_ I 9' ..... 4. ,:':, :3 !7;:3 :B 0103.07 ::-:::5: :B 9 :-'": 1:31,57 :':: 753 :_--:261,2:3 :36 29 :;::"::,.4, '.-., --,,-, ..... --' ...... · "o :z: ::_', 1 x" :-3424 .=, 1 2:4 ':' Iff ,[ h,l:: _. I I FIN .:,~.::k [::.R I "i'Y [; E G R F' E E; D E C; / 10 () I"OTAL I'.;:E: C'I"A N G ,..I L f.:'.'E.';: COOF:~: FI I NATES: NCIR'I'H/SC)LI]'H EA:..-.;T/WE::;T , ., i, ,.~.z, 2006,, 9';? '.-3 54.12 ,, 6,/z, "'., t') "', '~ ' ," ,-' .... ,. o ~_,. c:, ;/ .::, 54'75.49 2 0/-, 4,...,':'._':' :::; ~::; ~fi':":' 7 :2092, 95 S 5 6,01.59 · -I '""'* .~, · .' 1 ..' ..' · .)6, ,.,'::' oo/",'q.~"" ' · 1 4. . ';:" ...... "74. 9 21.5.5 :/ /:1. 6, :5; .._, / .,:.. . .,.' J. c, .I.. 1 1 '.E; 57'.-.-,'0, '.:./5 ...'~:11 04:3 ='""':"" ':.".:'4. 0, "'= 5'.--.,' , ........ ; ..... YE; :1.7 10 ";":'.'7C~ ":~'= '::' 597'i? 2:301.4 '7 S 6041 · 8'P. · g, .-:, ..:,.-., .~. ...... ~.. _ 1 ....,c' /_,.. :L 04 . A.. 0 =~ .-:, · ::,.:,/..:, c,c,.,_-~: /-, 1/-,/_" ..... .~. ,.., _, ._1 · ,_~ ,..t - - n 239!15.4 ? S 6:229: · 96, 242 7. :32 ::; 62':'.;' ~. 29 2459:3 F., S ""~'" f'](] . . ~ 6.:,:".-',· _ . 24'F/~.._F,':'._, ._,':' 6,4 ~ '::'~,. 30 .--~ f.- .-~ . · _ · .... .,-.:,.,::4, :2 ~ .?'; 6,.~-z/-, :::'-? .-, ~-,..-. - ,, /- ~-] .-_,,_-, .,- ..... ,7:37 S _, ......... ·09 n " · 2tS!91 19 L:; c .... ::,:,. 12 2625.06 S 6657.26 .-, , ~:.-,,-, ,:..- ~ ", ,'¢'...,.'-,, 4._,'-' :,/1N 6.::: .... · -! - a .. _ · 26,91 64 '-' /,772./-]9 2'7 '2:2: · :3::'::-, ::: ,'5, :i:: 2 :L::. 01 275;5. ]. 4 :.:3 6,:E:82. ,'30 27:.B5. :50 S &9:36.79 2814. '::,'4 ::-; 69::-:'.:.,'. F",8 2 :ii:,'.l. :3, 'P 9 S 7040.4:2: 287:2, 61 :.::'; 70:.5: 9.6, c] E E E E E E E T Z~ E E E E -E E E E E E .:!: = 10/.:,, 00 F"l~. VER'f' I F:AL :_.:; E C: 1" I 0 hi '.SF:'F_'i:q.;~Y-.SLU',I WI.ELL SLIRVEY I i'..lG F:L]i"ir:'ANY A Ix! C: H 0 R A G E A I_ A ::':; I..: A I"~ I:R A'T H 0 N 01 L tS CI M F'A hi Y _/..r..,r', ,, ,:.c'~ .... :"--"-TO'?N R ~.-.::~. ) COMF'UTATI ()1',t DATE'_' . ~..~ ~'~ ~,o~- -. ~,.~..~ ~.~ ~... ,~ .-~ .................. R A .F..~ I N G B A Y U N I T . i'IA Y (':,:3, 1 '::-,' :32 L A S I< A ·0 ERT.'I:F:AL SECTION C:ALC:I_ILATE:EI ALr..]HG CLOF;LIF:,rr-:' P A r} ~ E 5 [IATE OF fi:I..Ii:,:VL-'EY AI:::'RT.I_ 2'P., l'i?E:2 : BOSS - GYRCr..:?Cr'~F'I C SLtRVEY .............. ,.JOB NI_IMB[:(R BFd:;.. ....... .::;- 1 ,,'-,C~ 1 ":'.. KEL. I_Y BUSHING ELEV. =-' !06,C, 0 FT,, ..... Oi:::'ER A TE!F.;,'.- M I LAM .... TRUE. S,I. E': -..- :F:: E: A .-CI_-II_IRSEi: CF)I..IRF. i;E-. E'A S;Lff?EI] VE:RT I C:AL VERT I C:AL I NC,:L I NAT I ON D I R E;C't" I ON 'EF'TH DEF'TH DEF:'TH f'~EG M I Iq DEC'iF'? EE S 12':.') (') c) :-361:3 ='.''"'':;'-'"" c'-' PS '= :34 '"" ..... ,.~ ,:,.::, .., / .... :, :'::.'.i~ .::, ~-, ,-,-' '"D',.~ ~-, ~' ,-,'":,,..-'! '-,,-,, 12..' 10.. C). c, 6 :., / . ,::,._, .~, 1 , ..... :32 ..,::. ,:, '.'3 ,. 1.2.-.'200 8781 ':.'~ q' '-' '-":~.i ":::'"'" '::' ............. c:,/..:, / ...., 99 '-' ....... . . .. ,,~' 1 ...J · -,.-,-] c,,::: ,-, /. 1 .,::...:, 0 t /-, 7 41 ,:, 7 .::, 1 41 ::: l::) :"::'-T/ c. 1 '.::'4C)(') :.~:'."."~5Ll· 14 ' """~" '"' ' ........ ' .-, o 4,:,. 14 2':."/. :2 ,.:~" , 1 "."~Or.~ ':7041 ,,_'F.,'l ,-,,-,.-,='- o ~ .-,,:., · ............ o;-,:,~.. :: .~ ...... ~.:,. .I. 1 S 12/:, C) C) '.-7; 12, 0,54 '?; 024, 54 2,':-., 5'iF/ :i.:; 127c~0 92'20. 15 9114.15 25 41 S 12800 9310.48 '.-):204 4.:9 .... ":: 6 S ] ..... 290 c) '.T/4 (') 1 .54 '-' ;, ~ '-' '- .-; ._, ~ . 54. , 2:3 4 - 1 S .l !7:: 0 ()c)'? 4 '?'.3, 78 9' :':: 87, 78 21 4:3 .131 O0 '- ='-' . '.39 ...... 19 2::: ;/._,o7 .::;'/481. :39 - '-' ]. 320 ,:."~ ':T,, ;'.., C:', 2. 10 91576. :t 0 1 ',2,1 '.-'":.; .1. :'-~ :300 ':.",' 777. :32 '.;',' ./'_-, 71. :32 ]. 7 :'.:: 2 S _ 13400 '?:---:72,84 97/:,6, ::3,'-I- .... 'I ,,~.. ._,::,'='"'" S 1 ,:, ._, ,.., ~.. 'T,"-7,'/-,:--.~ '--"--' '-.-,'::'~/-,~ · :_:::_:: 1 =' -' - · _, ::', ::::S .... I ,m_S._l . ~ -- 1 :--: 6 0 0 10 (') 6, 5.2 0 'P'P 5 9.15 15 :31 '.S . J :7.:7C)0 .I. 0 J. 6.1, E::C) -. - .t. 0055. C-:O J. 4. 15 . HFIR.. I ZONTAL D I'.S;F'LAC:EMENT = "'-"'°7:3,._,._, · ..'._,""':"- 5'P. :":":,:) E" 60, 10 E 60, :i:':0 E /:,0. ,,,:,0 E"' 59.60 E 5'P. 0.. 1:-]: 5'.:.:',, 10 E 59. :2,0 E '-'-. 69 E: o_~ ::! . · 59'. 0 E 57.1':.-.~ E 56.2,0 E 5,:1.. F-:O [E 52.50 E ~'- '~" .,' 54./_-,'.:.:' E 52. lO E I:: 0 ('J -.-L IE IS SEVIER I T Y D FZ iS / I 0 O. 57 'I_._'[2 c). 6:2 1.31 :i.. 69 ........ 0 · 89 I · 21 · O. 1. zl. 5 2, O'P :2. 35 !. 44 0. 0.66 :1 4° 0.7 t - 1.28 FEET AT SCIUTH 67 DEG. TCl 'r'A [~ i:::~EF':TANGI. JI_ AF? C:IZH:] F,:D I NA"FES VI:ER'I' :[ IZ:AI_ I .... "' "'.._ .:,E_.TI N Jk f I-tf.:.,rH rTH EA'.F.;T!WEST "" 'F' · 2'F;0() 6,4 S /137 7:, El 770:':: t::::::: '-"':~'--"-/ ':..;'4 '"' .._ .~ .... .~ -, .:, 71 E:4, ':~::: E 7757, ';:',", .. · ",9 ~.;: a 23 S '72:3 t :31 E .7:31 (-~, ./ 2 .,..~ '1'. -' . - · · -'-'~: 64E 78;S2, 2 ':~ 7'--/ 6/-, ':'-7,:: z :,. '-'")- 4 ':' . , /:] E · ~ :.11 ,:.,(. t) , 4 E .... 7319 -~" '~":/ , 6 .... .:,Oz.,:,, 1 S -- 7:36,0, EE .......795'?~ 4-:--_.: ...... :qo :-i 9 7' 4 S 7 4 o 0 '7 ~.'~ E '-' ' ' = .- ......... ,:, 00 .... 2 :2, 0'~.~'7, ""'-' ,:.:, :.'E; '747'::,_, · '7~ F E.i:CxE~ .... 1,7~"~ 311 A. '~''-''-' -' ~ _ ....,::, .:, z ...., 1 i. :30 E 813:2:. ,:, 1 :.:~b~, 6 5 S 754 Zl., 0'7 E ',q 17 q, -31 "._, .... 1. :E::3':'._. 757:3.44. E - - · :B205 ,..:74 ... :":: 1 -" ' 01 ':' ""'::'""' :/ :.':: 9 I--- :-::25:/-, 77 / ~'",..._, / --~ .:' ;: ......... :31 '.-:;'4.11 S 762..:;I. 5(:) E :.:):266.4 7 .... · ,-,'-,,:,,':: (-) :::./12, 1 :':: :::; 764'7 !.;;:3 E - ,::, ,'; ._,.., 'q '-"--":' ':":' L.; 7670 4 "' . . ..: E :-_'i: :3 :2 2 . :3.1. ._ ;:.. ,-. ~.,m ,_, E:':~ d 4, :-': 9 S 7/-,_ ''-/.. .1 , '"-/.. :--:_ E :3 3 4 o._,, 3260.59 S 7712.32.E - 8:37:3.25 ..... 4 Mlhi. EAF-;T AT hID = 1:_--:70c) ]"HE CAI.._CL!L. A TION F'RF,.-..:EEIURE::-': ARE BASEl.] ON THE I_IE;E OF THREE DIMENSIONAL RADILt:S I_]F CLIRVATI_IRE h'iFTFIC~D. IARATHC~N O~L r':FII,IPANY ~--6RD (E:EC29' TOgN .F,'.IE:W) E;F'ERRY-F;LIN WELL E;UF~'VEY.[i'E'.~ COHI:'ANY A N (": H O R A G E ~ L A'.:;I.::.' A ,T.:C HPl..I"r'R ]"I ON [)A T'E M A Y N :.3, 1 'F;:32 F' A IS E /-, DA]"E Of:: E;LIRVIEY AI'::'RIL ,JOb IxlUMbER BOSS-16012 KELLY BLISHING ELEV, = lO,f':,. CIO F'T. OPERA]'C~R-M l LAId INTEF:F'CILATED VALLIES FOR EVEN 1000 FEET C. IF I'iEAS;LII::~ED DIEt:'TH TRUr...- ,'1!? A E;i. iF7 !70 L,'ER T I C A L ] ri;; F' 7' 1-.t Ei-.FT... F:' T H E;UB- SEA To'r','.'.1L VERT I CAL. REECTN I'-.IGLIL. AI:.~ COCIF;;EI INA TE::T.; MD...-TVD F. fEF'TH iqOF:~ TFI/::'.!;C.~I...ITH E..r.:,'.E;T I W. E::::-:;T [) ]. F'I::EREtqCE VEF, T I C:AL C 0 R F,.' E C ]' ]. 0 N ..THE C:ALC:LII_ATICIN F'ROC:EEd_IRE'S ARE BASE."D ON ]"HE:'.U:~f;E. OF' THREE D IMIF. NS ION£;I... RAD!I..IS OF CL.IRVA-H_IRE ME::I'HOD, :=;F'I'{F;eF:Y-.::;LIN I. IrL:L.L SLIR',..¢E-Y I I,.IG COMF'AI',IY A 1'.4 C H OI:;,'AF~E AL, ASI<A AF,'ATFIC'Ihl 13IL COMPANY -6RI:'I (SEC2'? ]"09N Ri.3W) 'F?A.t:I ! NI.'3 BAY I...IN I T ,. .. i:::L-.IMF'I...IT~'tT I L-.:N .[)A'I'E MAY O:3: .1.'::/'="? F' A G t;; 7 DAT[E Cfi= ._lOB NI_IME',EI:? BEI:F.;S..- 160 .t 2 KELLY BU.'=;HING EL. EV, = 10/"... O0 FT, ......... OF'ERA TCIR....M I LAM .......................................... !I'qTERF'CILATED VALUE:::; FOR EVEN 100 FEET OF SLIB..-::_:;EA ['~[EF"]'I'"I 'r'R U E S U B-.. :..:_-; E A T' 0 TA L. Vf.::l:;: T :[ C:AL. VI:=. RTI 13AL I:'d=ZC:TANGLtL. AF:~, C:O0 F':,'I]. I NATES MD---'TVI) VER'I" I CAL DEF'TI--.! .... DEPTH..: . NORTH/SF~U'FH : EAST/WEST ..... DIFFERE;NC:E ........ C:ORRECTION ...... 806 · ....... 1 .'.} 06 1107 120 ::--..: t ......... 1.'::1! ..... i .1415 .1.. .15:21 .!. _. ld,2':=' i 1740 ]. 1 :-_--,'.54 I 0. 0. O0 (). O0 O. O0 O. O0 O. O0 0.01 O. 03 0.13 0.44 1.44 -2.47 4 IP 6.02 O, 72 3 "' ~ . 'IAIR~TFIOIW OIL ').--:-,':-,RD. ( '.E;EL-:77i;? TO':?N R .1. :2, W ) ~RqD~NG F:AY UI:4ZT ~ !... A S I.::' A ,'"' *! I'- ' 17:i; F' .E F:.:R Y- IEiLIIx[ {:J E L L .::, I.j R v I'Z Y ]. N G C CIM F'A l",! Y F.'.l b!l:: H I]l~ A I? E A [.. (-I ({; K A COMF'U'F;:,T :r ON MA Y 0 :_--.~, 1 '.:782 F t-'~ L, E DA]-E CG:' '.:-.';L.IRVIi:Y AI-:'RZL 2'rT."., :[ '.:.:' L:: 2 ..... ,J 0 B N LI M B F:: R B 0 ~.':.; '.E;- 16012 KE L l.. Y l{'~t-I(':;l"l I i",l('j E L t:~ V. := J. O/-,, 00 i'-- 'F, OF'E F't:A TF_IF;:- I'11 I_.AM ............ 4 E A '.::; I..I !:] .-F: .U 3EF'TH INTERPFILATE.T..I VAL. UES F(]R EVEN iOC) FEE'F OF SL.IB-SEA DEF'TH TRUE VERT ! CAI .... DEPTH · :,_ E,-'.:,E~ VERT I CAI_. DEF:'TFI FI1 Al REC TANC. iLILAF:( COCIRD I NATES I',IORTH/SE~UTH EAST/NEST MD-'TVD Ii..'[ F F: E R Ii-: Iq lC E V E'.: R l' I C iq L C 0 IR R E C T .~ 0 N .1. 972 2:2>--:7 :2:365 25 ! 2 .--,., --,e .': ,"7 /' _l '7'2" ':' :.'..i: 02 .'1. :7:: .1. 9:2 :.3:7:: 6 1 :}.':~:29 _. :.-:: 6 ':? z!. 'F::.:.:.--'5',',:-: 4020 4.1. 01 4 34. 2 ,.'t !5 (.'.)3 49:24 .1. 90 6, 00 2006, O0 2.1. 0 6 .., 00 2206.00 2 :.-:: 06,00.. ':';1, t')/-, 00 .,: ....It 2506,. 00 2,.':,06. O0 2 '70,S · 00 · -"" (') A ("i 0 .,::. ,-, .. _ ,~ :7:':? (') 6, O0 :..--'." ':.'m: 0 6,, 0 ¢.'.) :2: .1. C' 6. ,:.Z." 0 ?.: 20/:,. 00 :_.-..~:306. O0 :3,.1- 0/_-,, 00 ::-: 50 c'-, ,, 00 - :2:.,'706, 00 1800. O0 .1. 900.00 2 (:)00.0 o 2100. O0 .2:2C)0.0.0 2:_--:00. C) 0 :2400.00 .~: 7,(..) (2, 0 26(')0. O0 2700 ,, 00 2:30 O, 00 . 2900. O0 3000, 00 · .:3100.00 7:200, C) 0 :'::400,00 :':,'/-, 00, 00 77, 73..::: I 12.8'7 134.4.9 0(,). ',':'('.', .1. 5; .1., 25 2:2_' 6,0 261.77 :297.52 :3:32 ~ · 36'P. 20 · _o _ ,~ 444,69 4 ',_--:.'::. 0 .5:2: I. 4,,':_., 'Z':." I;: ,--~ ._, ..~, c.. 5P5; 4:3 .:,.: ~:, 61 671. !4 O0 E 23 :E 34 E O0 · E 51 E /..,' 07 E 09 E :-':4-E :30 E ,_-,6.64 90; 46_ 121.07 :1, 5-;9.40 .: 206.'61 2:'/:, 9.2: 7: 3 42. :2 7. 415.31 555. '27 · ,-, "'1 t-, .-' .-,. / .-,.,.',, 04 r--~ 1 ,!. '?:36. 7,'.'.:: 997.26 '1057.64 11.1.:3.87 1 ':' 18 23.82 :30. A 1 :_'--:8. :3:3 ,.':I. 7, 21 62,, 72 72, 7:--: · 0 71,0:3 6, F-:, 14 1:,5. :24 6,2.89 61.0 4-,C). O0 60. ':'"'-' 60. 7:L:: 61.2:3 IA.K.,,'ATHON OIL CFIMF'AlxlY I=ARD (SEC2? ...TO'F'N R,t:',N). %'A.O T. NG BAY LIN IT !L. A S K(4 F-;F'ERRY-SUN WE:I_I_ SL.IRVEYING C:C~HF'ANY 'ANCI..flnRAOE AI_ASI<F.~ ................. L-:I.'J M F-'.U T A"F I ~'i kl ] -L~tI:. - - MAY 03, 1982 PAGE_' 'ii:' DATE OF 5;LIF~VEY APR I L '29, 1 '.:.,'::::2 ,_lOB iqLIF1BE:2R BOS'.=-;-= 16012 KELLY B1..:I:=;HING ELEv, = .t06, 00 FT, OF'ER~TOR-M I L, AM Z Ix!T'EIRF'OI....ATED VALUES FOR EVEN lOC.) FEET OF: '.qI..JB-SEA E I:F FI'--i TRUE S;I..IB-SEA TOTAl_ 1EASURED VERT I CAI.,. VERT I CAI_ REC:TAI~GL~LAR COCdRD I i,.IA T E'S HD-TVD }EF']'H ......... DEF']'H BEF'TH .Nt..IR~ H/~:, jl_.l FH E:AST/WE:ST D I F'FERENCE VER'I' I CAL ) C: C.~ R RE C: T ICIN ................ ':'..- 4'.:.? 8 .1. :B F.: 0 c'-,, o 03700, C)0 7 t. 1. '10 S 2560, 62 5.1.4::_,'. ......... :::'-.';0/-,, C.x) ....... 3~sx)O.. O0 ...................... -= - ':' ........... /,.,7 ,/:,i.. b; ...... 2,S79 · 7~- 5::: I 0 4C~06, O0 · :B'PO0.00. 80':?. :,:-::0 S 5477 4...106 .0 ..... 0 : 40 A ('~ , O.O. 8,S 2, L=', 1 ~.,c. ....... 56 ~I.~ .......... _42D.~ .... 00 ...... ;_. 4100', .00 ........... 'P 16, :E:'7__ S · -,(- - ,:~--r.-, 5',=-: O'P 4.30 ~,, 00 .4-.,.- .) U, 00 .~ ~ ..:., 23 '..:.; 597'2 4406. O0 4300, O0 ....... 6i :st4. .... 4506.,., O0 ....... 4400. _00 ..... /:,:,T:'95 4606. O0 4500. O0 ./::,4.54. 4706.00. 4.600. O0 ....... 6,613 .....~].:=:06.. 0C~ ........... .4.700. O0 ,.'=,7/=,7 490/_-,. O0 "-1800.00 6'.-.? I. 6, 5006. O0 4-'.:.?00. 00 .......... 7. 075: ..... .=_5106 · 00 ...... .5 C; Ct 0 · 00 7'2:.~:4. 5206. O0 51 O0 · O0 7:.:.:'-.?7 .5:?06. O0 ~.?00.00 7 P_:/., ~') ~ 40 z. 00 .=, :q ~'~ ('). 00 7:.--.:72 5./:,0/=,. O0 5500,, O0 !AIRATHON Oil_ COHF'AI',IY )::-;;,RD ( SEC2'5' TO':7.'N R :1 :.'.:.:W ) 'F;;A[)]'tqG B,AY LINTT )EF'TI-I . E;F'ERRY-Ei;I..IN bJEL..L E;LIRVFYIIxlG COMF'AI",IY A N E: H 0 R A r3 E A L A '.!.:; K A f.5:L-11'11::'lJ T A T I 0 N Ii A TI!"- MA Y 3'-' 9P, 2 t..:,, :L. _ INTEI:?F'OI_ATED VAI_I..IES FOR EVEN '.-.';'29 .I. 9 ,!- 22 'i.:,' -- I:'" £ ~--~ '.../ ..~ ,,.-., ,]:. '970:.7:~ 'F' E: 4 :--: 9':7.'E:7 10.126 1('265 .104 05 ~ 0 545 VERT I (AL :~; IJ El- E; E A T 0 T A L : VERT I (AL RECTANGULAR .... DEF:'TH .... NFIF?TH/::-]OLITH 5706.00 5600,, 00 580/:,. 00 570C,. O0 5'F' 06.00 5 :::'.: 00,00 6006. O0 5900. O0 ,.":,.106.00 d-, 000. 00 6206,00 6,100, 00 6 :.7.,'06. 00 6200.00 640/_-,. 0 o 63 o o. 00 6506, 00 6400, 00 6 E, 06 ,, 0':) 6500.00 170:3.2 ! 744.. ,19 .1. E:24., 2 186.,:'::, 64 .1. '? ():3,..1. 7 194:3. ._! .."! 1 '-"-"-' 9::: .'-" ,"', .,L ~ . ;2022, 0 ("~ 20/:, 1.97 2101 214. 2, :2.1. .,..';' .1. 8:3. -'/.::,"- · ..' '? 'T.' r5 =-' .,_.,_ .... 2'26,'7, 30 2:309.60 · -, .-, e_-.-, 0 '--t 5:39 7 . :34. 2442~ 0 6,806. O0 /z, 700.00 6'P 06.00 6, E: 00,, ('),.'":~ 7006.00 . /:,900.00 7.1,. 06. O0 7000.00 720/_-,. 00 7100.00 73 C, 6.00 ... 7'.::: (.', 0.00 7 4-0 6.0 0 7:3 0 0.0 (.) 7506.00 7'4. 00.00 10(") FEET OF "" I" , ..... . . .::,L B -.- .:, I::: ~ DEPTH (FIORD INA TI.ZE; MI]- T VD [.:-A:~;T/WE.'.:.:;T - D 1F'FERENtT:E "" 1~ 61 E · :, .4'7 . S 4-S16.30. E · :, 4':."~ 14.0'7E E; .5()0'?. 01 E · _,'::' .... .:,.I 01.. 61E o.,:... / ,:,, 0'5: E ~-. I~,;i ,"'"~ ~ . · : .... .:,6,1 06 E ':' 5445 47 E ':' ~"-;~:'-'"" .=12 ....... , .:., ..:, E · :, o'-::,'.."t~ 17 E ':'..., 5707 , :38 ~: '-' F, 79/., 48 E /'% .... .... ,8E:4.. 57. E ':' 5'---~ 72 ::7,:] E ._,c. /.,_ 0 .~5_ 8...t 2 E .: ...... 6145,14__E . - S 62:2:2. E,O E '._:; 6:3 ] 'P. :2',8 [-.:. 2:31 / '-~ 1 .--~ .-.~ / ~,:,:,,.:. 4.81 - 2,:1.10.40 2495.73 2~:q":'/: 1 :2 !57 ,'1.. :20 2,:':,09'. 98 2646.57 · ~'r ." ..,'2 "2' '.:" .- · 2723 ..'79 2762.57 · ':., ,,:::~ (') .'.':, ,-, - ......... ,.-., (.) 2E:,q. 2.4.:::: 2801. 'i;,' 0 2920, 3 0 .,:'. 2:/ 2999, :::4 :30:39.89 PAGE 10 DATE OF SURVEY APRIl. 29, 19El::' dOB NUMBER Br~:z;~q- .... 16t) 1 ="" KELI_Y BI_I::31..iIN(3 ELEV, = 106. O0 F'T. .... F~F'ERATOR-M I LAM ............ . ..,:::, = . . . 45. · .:,. 47 41. f46 40.4.6 · 3E:. 01 ":'"'-i 79 · .':)/.~.r':"' :'59. ] 1 :..:.::...-.-:. 1 .1. .. 4 O. 24 :39./:,7 :39, 42 ':":' 4.0 ._, ,-'1 · :::'7 · ~'-' .. , 4-0.0 40 0~-- m ...i :E;Pr:~;I-?RY-.'.:;UN WELL :=;URVE¥ING COHPANY ANCI-tORAI]~E ALASKA IARATHON OIL I';:OMF'ANY' )=.E, RD ..... (.SEC2?.. T. OgN .R.t3W) ......................... COIdI=-'UTAT. IEdq DATE "RADING BAY L.INIT MAY 03, 19:32 !LA - ', · F'AGE i :t DATE OF :-];URVEY AF'R I L 2'=:), 1 ':.-; :32 ,_tL"IB NI..IME:ER B fl ::; F; '_ _ _ 1601 ..":' i<EL. LY BI.J:-:~HING EL. EV, = 10,S. 00 FT, 0 F'E R A T 0 R- M I L. A M INTERF'OLATEL] VALUES FOR EVEN 100 FEET OF SI..IB-F;li::A DEF'TI..~ . .::,LI~ -.:,F...A TOTAL TRLIE "' ~ "'' , "IIZF~SUF,'ED VERT I CAI_ VERT II':AL REI]:TAI',!GLILARi: ci3r]RFiI NATE._ HD-TVD '~E'F'TH ........ DEF,.TH. [ EF'] 1-4 NORTH/::.';OLITH ' ' EA.=.] '" .... ... ................. /W[.:.c, 1 ti I FFERENCE .......... VERT I CAL. '~ C l.-.l R R E c;;r ]: O lq .....~ t 0685 7606, 10825. 7706. .1. 0?6:3 7806. ] .1..1. ()0 7906. I. I ""'-' = 80 06 .!. !:366 ] 14':'.-'.6 1162:=: 1 .I. 74l,'=--: I ]. 870 _.. ]. :.7.: ]..!.0 I :,..-...' 2 '2:3 .... 123,.t4. I :I. 2572 .... 12 E.:--': 4 '-'7'-'F; ~ 2?04 00 7/-, 00, 00 '-' ='-''-' "'? '----' '-?':' '-":' O0 7700 O0 '"' ~''''' ~'' ~ '--' '=': ' .... ::._,/o. 7~. ..... . 6576, c,:3' E () 0 ': 7:E:O 0" 00 '=.'/-,':-'~, '.:'4, : 6 E, 57, 61 E · . .~... _ ,.~.... ,.~.. _ .._l: . '. - 00 790(]. 00 '..:'/-, 70, '-''::' '-" ":" /- "' ............... :,,.,_...:, ...... :, 7.=, 6:31 . E 8.1, o../..,_. ('.~ ......... A ;:r c.~ c) o . o ...... 0 271 ._,':'. 4./-, ...... S /-, 80 c.;, .72 E 8'206 00 ',310 ("~ 0 ("~ '-'- ::~'-' ':' ...... · .' 1 ._ .:,, ':~...,_';' ..., E,. :=: 8 (] ,67 E 8:::(] 6.00 :::2(") 0 00 27':72 4.5 S 694'=; ""':' ....... . . .... ·. ,=,._, e :: 4 ('1/-, 00 8 ::: (3 ('} 00 2':'":'":' '- = .............. ._,=,. ::~._, :=; 70 ! 4.47 E '-"-' :3 ? CRT:'-', ?3 E :::!-30A 00 840A O0 .::,:,/=,4 ':"~ ..... :=:/=,C,~/_=-,. O0 ..... 8DO0 ~ O0 287.?:q. t 2 S ..... 7133..43- E :=-.:7C.~6.00 :F.:600,00 :..-:."? :3 0 ,, 67 L=.: 7 ! -3'.:?. ,':,8 E ::.=.: 80 E,, 00 8700, 00 296 :I. ,, 5,.I. S 724. 4. :3'? E A'?06.00 ........ :3800, O0 2990, S7 S . '729;2,. 48 E 'P 006. Ct 0 L=:'? 0 O. 00 :3018, '?'P :"_-'; 7 :'=: 44, 4 6 F '? I (]./-,_. 00 90 cZ). 0 · 00 304-6, :32 o'-' 7 ::: .... ::: 9 , '? 7 E 9..,_'.:' o. 6 .00 . ':'... 1 o_ o. . Ct 0 3071 . 'F.' :3 ._,':' 7432 . o; ,.,~-- E 9 :::,:]/-,. () 0 9'.--' A 0 00 ::: 09/-,' :1. 7 :E; 747:3 '- ~-' ............... . ......... ~: ::/....I E '.-:,' 4-Ct 6.00 '? :2, 00. 00 :31 .t 9.2'? :'=; 7512.9 :=: E :307'::? 50 :315 7, 76 3.194,61 :q229, 61 ......... LcI2A,('!. '- :" ...... ,'/' 3290.07 :3:317.35 :3342. 16 · ':, '5 ~ '=, ;:-,'384, 74 :3404 ,, 2:1. :342'2. :30 3438.82 :'=': 4 ;5 :'::, 24 :'::4/=, (.'-.,, 47 3 4 7:3.3 () 3: 4. ::::9.05 :34'?:=:. 87 I'IAF~'AT}"If3!~,! Oil.. COHPANY .O-:,_'-,R.r.) ( $EC2'?, 'TO2N TRAP!h!G E:AY UNIT SPERRY-..:.--.;UN WELL -"t .... :,..r~v~:~ IIqCi COMPANY I]r''l''''~ ~3 ii: ..t'. A N C H (3 R A G r"- A L A ::3 t< A DA'I"E OF' SURVEY AI:'"R I L. '2'P., .1. 'Pt-32 COi".iI:::'UTA",rI t.3N DA'TE NAY' r,~:':: .,._ .................... ~ ':",.-.:":'... ,_ .::. , lOP, NI. INP, ER BFP.::;S- 1Z:,("~ i .<"" k'.'l!i~.LL.Y BU:Z;H.[Iq(~ ELEV. = 10c":,. O0 OPF RATC~r.!~-.H I L~M INT.ERF'CILATED VALUES FOR t.-ZVE.'N 100 I'-:EET OF C-';UB-S[EA DEF'TH TRLIE ::-.;LIB,.-:,-7:E~ r' i:.:A'.::.:l F~'E ~::f V[:T. RT ;[ CAL VERT I C:AI._ .F..CEF'TH F..IEF'TH DEF'TI.-~ TO"FAL Rt/C:"FANOU!_.AR ]:C O!:Rh I F.IATES HD-TYI] NCIRTFI/'::]CII_ITI-I E"'AST / [,~EST D I F:'FERENCE. ~;ER 1"I C:AL CC~RRE:F:T I I.]N ....... 1 :'::() 1 '::" '::'~ ~ ' ' 'P 4(') 0, (] C) ......._, ... ::,0 e,, C10 ...... ~. :.?, ], ] 9 ?606 oc~ '-'~ ' ' I'''''-''-''= ':~70A O0 '7600, O0 .1. :3:3:30 5;'806.00 . 9700. 00 I, :3,~. :34 9906.00 9800.00 . 1:35:3 :? ! 0006,00 'F'900 ,, 00 1. ::/: 4.'2 ;t 010 <5, 00 I 0000. 00 ]. :3700 I 0161, :E',C~ 10055, :30 :3 :[ 41,2 9 :..:: ' Y54:3, 1 7 E · '2:1 ,:, 1 F~'.-..' S / ._,, ,:,. :-'.'~ 8 5:1,:.,"" c..) .r.:] ("1 c. 7/-, ~'~'.., ":"~ - :.'5: ! 99, 6:3S 76:.'-.': I, ('.':,'.;~ "] :32..: ! ::2:, :'36 :--;.. 76 5."-'J. F-: 9"-. :3234,90 :.:.-..; 767'8.9' 1 :7.: :7_' .[5 .i . :734 L--; 77()0.9 1 " · '2:2/', 0 ~;9 '"' - · :, 771.-° :32 6.57 5.41 4., ?5 4., .55:7.: ,_~ ~, .'I~ :3.78 1. S2 CAI_CU[_AT T. (_iN PROCEDURES USE A L. I NEAR I N't'F::].q,'F'CILAT I L-rf'..I B['::-.TWE[-.-:h.! THE NEAREST 20 FOOT MI] (F.'F:F~M F;:ADILIS CIF CLIF:VATLIRE) . F'OINI,::,. -~o~0'. oo TRUE NORTH ',. Marathon Oil Company Our Boss ~yroscopic Survey Job No. Boss-16012 Well: D-6 RD (SEC06 T08N R13W) Trading Bay Unit Kenai, Alaska Survey Date: April 30, 1982 Operator: Marvin Milam Scale: 1" = 1000' .. oo ' ~oo. oo .,~boo. oo s'ooo, oo ~'ooo. oo --4000, O0 HOR I ZONTRL PROJECT l ON 13700 Marathon Oil Company Our B~ss Gyroscopic Survey Job No. Boss-16012 Well: D-6 RD (SEC06 T08N R13W) Trading Bay Unit Kenai, Alaska Survey D~te: April 30, 1982 Operator: Marvin Milam Scale: 1" = 3000' 0.00 . 3000.00 6000.00 9000.00 8373.25' @ S67o 04'E k13700 12000.00~ 3o5o. oo 6oho. oo 9o'oo. oo VERT I CFIL PROJECT I ON Suggested form to be inserted in each "Active" well folder to check for timely compliance with our regulations. - Ope~ato~, ~el 1- ~ama ~nd N-um~f Reports and Materials to be received by: R.,~t~ired [~te Received' Remarks Cc~qpletion Report Yes ~.--_~~__~ ~ .~ ~ _ Well Histo~ Yes ~_ ~7_~ ~/~,, - ~ - Pt ~ ., . . . ~re ~ips ~ ,, .... ~~.~.~ ., , ~ t / Core ~scription ~.~ ~__~ . - ~ ,~ ,, ,,~ ,, Registered Su~ey Plat ~~ -- ~ ~ ~, , , , , Incl ~a~on Su~oy ~~ . ~ ~ ~ ~ Dire~ional sU~ey. YeS -p / ~' I $ ~ ~ k ;~ d~ Drill St~ Test Rem~s ~.~~. ~-- ~ - d~/ ,. ,.. , Pr~u~ion Test Re~rts ,7~_~' .' .~_ ~ ? ~,__ d/~/ ,, ~s R= · Yes ~--'/'?--g~ ~i'" , ....... Document TransmittAl Union Oil Company of Cali ~a , D'ATE SUBMITTED AC~:OUNTING MONTH 5-!7-82 , , TO * FROM x~ Mr_ Harry Kug!er ** R. ¢..Warthen State 0 & G Cons. Comm. PO Box 6247 3001 Porcupine Drive Anchorage, Alaska. 99502 TELEPHONE NO. TRANSMITTING THE FOLLOWING: D-6 RD' 1 ea.',Magnetic tape #1279 and verification list. , , 1 ea. Blueline and sepia of the following' DIFL 2" and 5" DIFL TVD 2" , , BHC-GR 2" and 5" CNL-FDC 5" FDC-GR 5" ..... ! ea. Directional survey ~ PLEASE S I~AND RETURN ONE COlbY ..... , ..... :~u~gO .... ~ ug , , , FORM 1-2M02 (REV. 1 1-72) PRINTED IN U.S.A. i ' F'~,, STATE OF ALASKA ,~'~ ~~ ~ ALASKA ~.AND GAS CONSERVATION C~ MISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIO" 1. Drilling well [~ Redrill Workover operation [] / 2. Name of operator Union Oil Company of California 3. Address P.O. Box 6247, Anchorage AK 99502 4. Location of Well at surface 673' FSL, 1220' FWL, Sec 6, T8N, R13W, 'S.M. 5. Elevation in feet (indicate KB, DF, etc.) 106' KB above MSL 6. Lease Designation and Serial No. ADL-18729 For the Month of April ,19 7. Permit No. ' 82-20 8. APl Number 50-733-20147 9. Unit or Lease Name Trading Bay Unit 10. Well No. D-6RD 11. Field and Pool ,, McArthur River Field 82 12. Depth at end of month, footage drilled, fishing jobs, directional drilling problems, spud date, remarks 13,838' TD 4452' drilled during April 13. Casing or liner run and quantities of cement, results of pressur9 tests 336 jts of 7", 299, N-80 casing run with shoe at 13,833'. Float collar at 13,724' and stage collar at 7592' Cement: Stage I 1250 sx C1 G Stage II 600 sx C1 G Pressure tested stage collar to 2500 psi--OK. 14. Coring resume and brief description NA 15. Logs run and depth where run DIL/Soni c/Caliper/GR FDC/CNL/GR CBL/GR/CCL 13,826'-6450' 13,826'-2500' 13,730' ~1 6. DST data, perforating data, shows of H2S, miscellaneous data NA 17.1 hereb/~ certify that~ng IS true and correct to the best of my knowledge. NOT¢~red foreach calend%a; Oil a s month, regardless of the us of operations, and must be filed in duplicate with the Alaska Conservation Commission by the 15th of the succeeding month, Unless otherwise directed. Form 10-404 Submit in duplicate ,-~ .... ~,' ,,~ STATE OF ALASKA ALASKA ¢ !AND GAS CONSERVATION CO;~ ~ISSION MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIO 1. Drilling wel~ Redrill Workover operation [-]' 2. Name of operator Union Oil company of California* 3. Address P. O. Box 6247, Anchorage AK 99502 4. Location of Well at surface 673 'FSL, 1220'FWL, Sec 6-8N-13W-SM 5. Elevation in feet (indicate KB, DF, etc.) I 6. Lease Designation and Serial No. 106'KB Above MSLI ADL-18729 For the Month of. MARCH ,19 82 7. Permit No. 82-20 8. APl Number 50- 733-20147 9. Unit or Lease Name Trading Bay Unit 10. Well No. D-6RD 11. Field and Pool McArthur River Field ~12. Depth at end of month, fOotage drilled, fishing jobs, directional drilling problems, spud date, remarks 9386'TD; 6662'KOP 2724' Drilled during March Milled section in 9-5/8" casing from 6652'-6711', across section. Spotted KO plug 13. Casing or liner run and quantities of cement, results of pressur9 tests NA 14. Coring resume and brief description NA 15. Logs run and depth where run Gyro from surf to 10,200' 6. DST data, perforating data, shows of H2S, miscellaneous data · ~ oil ~, ~,~ Co~ 4r~Cbora£o' 17. I hereby,~=e~tify that the foregoing is true and correct to the best of my knowledge. SIGNEJ;~'~/~'"'/'~ ~'J ~' ~ T ..~ · DATE ' N~~eport on this form is required for each calendar month, regardless of the status of operations, and must be filed in duplicate with the Alaska Oi~d Gas Conservation Commission by the 15th of the succeeding month, unless otherwise directed. Form 10~04 *Na~at~o~ 0~ CO~a~ - S~-O~e~O~ Submit in duplicate STATE OF ALASKA ,~"~ ALASKA ~L AND GAS CONSERVATION CC ,,,~MISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL [] OTHER [] 2. Name of Operator 7. Permit No. Union Oil Company of California 82-20 3. Address 8. APl Number P.O. Box 6247, Anchorage, AK 99502 50- 733-20147 4. Location of Well Surface: Leg B-l, Cond #2, Dolly Varden Platform 673' FSL, 1220' FWL, Sec 6-8N-13W-SM 5. Elevation in feet (indicate KB, DF, etc,) 106' KB above MSL 6. Lease Designation and Serial No. ADT,-18729 9. Unit or Lease Name Trading Ba7 Unit 10. Well Number D-6RD 11. Field and Pool McArthur River Field 12. (Submit in Triplicate) Perforate [] Alter Casing [] Perforations Stimulate [] Abandon [] Stimulation Repair Well [] Change Plans ~ Repairs Made Pull Tubing [] Other [] Pulling Tubing (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Duplicate) [] Altering Casing [] Abandonment [] Other 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Due to 9-5/8" casing problems below 6950' MD, it is necessary to revise the D-6RD drilling plans. The 8-1/2" hole will now be drilled from a new kickoff point at approximately 6700' MD to the original location at 13,829' MD; 10,350' TVD. Seven-inch~casing will be run to surface and cemented with approximately 1400 sacks and the well will be completed as a Hemlock injector. Verbal approval for~the above procedure was received from J. Trimble on 03-10-82 by D. Stover. *Marathon Oil Company - Sub-Operator 14. I h~certify that the for~egoing is true and correct to the best of my knowledge. Signed Title DIST DRI~ SUPT The sp/~fbelow for Commission use Con~dns of Approval, if any: Date 3/18/82 Approved -~opy Returned By Order of Approvedby J]¥ HA~RY ~. KUGL£~ COMMISSIONER the Commission FOrm 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ~ ...... i' i -'i" -1~ ' ? , ' it,."' ,_ . , i ,,, , . , , . . '.t ~ ~ , ~ . , ~ ! i ; : . ~, ,:_: ;.,..,-~-+._~..t.~-;_t l-t -I-J--! - .-t-~ .. DOLLY .,VARDEN.- pLATFOt, ., . , , ~ ~ _~_,. ....,, .... ._ ~_~WELL..~,.~..,,~. ............. ~ , .... ~ .... ~ . · , t , , SCALE I -1000 . . _ I ~ ~ ........... ~ ~ ............ I ' · ." ; ,' .'-', ..... ,..i.. ] -.~ ~ l ........ ~ ..... i ..... ,..~ I ~ ~ , -I , ,- . ......... i .... ~ ! :-'"'";'I-"i'''t ..... r-] 'T ........ : ....... r-~ -, r - ' ~ :' ' i ' ~ ; ' ' ' , ~ ' . ~ i = I ~ I I I I ' / I I ' ' ' : ' ' ' ' ' ' '~ ~ ~ ' I '- ' ' - ' · .' : ' .615 ' . ~~.~ ........ I ~ ...... ' .... ~ ...... 514 "- ~ : ~ ~ : ' ~ ~ ' ',i [ ~ '. . ' ; ; ; ' : i '~ , ; ' ' ; , .; ~ ~ , ' , , ] ...... , t . . . ' . , , , · . , 8 g : j : ; ' : ; : ~ : :--'i', :'I : ~' ~I-':-i. ~.", "' , ; I i ~ ' : : ' : ' ; ~ ' ' ' : ; I : : ' ' : ' ~ ' , ' ' · ' i ' '-," ' ' ?'t*-'-'":'-'-'-":' ' -':'"'-~'u:-"4-'-I'/~t" .... : ..... ": ........ ~ ...... ? .... : ....... ~': ................ ! .......... : ~..:: .... i'.:;: ~'~'t": ~'":';" ;-:'"."r'.:.. '"'"'l':'-:"-T~°~;:- - : [ I ~ ~ ; ~ ; ~ ' ; , ' ~ :, · ' '~ · ' .0 .... ;.~ ~ ~ : I ~ ' . ~..'~ .: .... I.._~ . _ ~ ; ~.~.: . i .... ~ .... ~, · ,.~ '..- . ; :-~- ~ .... ~--: --~ : ' : ,''~ . , ' '. '~ ...... - ' ' .......... ~ 'i ; .........,'"" : .t- :'"~-' ' ~ ~ I i ,i ' : ' ' ,',, ..... ~ , ~ ': ,, -' J ' .... : ...... ..., ,., ..... ...... ,_.,...., ......... .,._: ...... ,,. ' ~ , ' ~, : ~ ' --- - : - i ! - { ~ ~ , ~ ~ , ' ' 'TARGET ~. ~ ....... - , iN~LE'~eOS~-d-I t 'l'~' ' 1500 ~, ; , .... 5000 ......... TVD:4862;-- ~ ~ ............... ~'~ ........................ i'-'~ ................., ....... ~-' -~'4-': ~'+~- '~", ........ ~ ....: '3000- AVERAGE ANGLE; 39~'13'" , T : , . ..~ ..... I~11' ' · ] , ; ': .... 3,g29;DEP=8541 _ .i.: i..i I · 1 .... i. <.: .,-:--4 l.i ..: -! : . i i.-: February 9, 1951 Mr. Bobert T. Anderson District Land Manager Union Oil Company of California Po O. Box 624? Anehorag`e, Alaska 99'502 Trading Bay Unit D-6 RD Union Oil Company of California Perrait No. 82-90 Sur. Loc. 6?3tFSL, 1220~FWL, Sec 6, TSN, R13~, S~. Bottomhole Loc: 2344~-FI~L, Ii?0~F~L, See 8, TS~, R13W, S~. Dear ~r. Anderson~ Bnclosed is the approved application for permit to drill the above referenced well. ' 9]el I setup!es and a mud Icg. are not required. A continuous directional survey is required as per 20 AAC 25.050(b)(5). If available, a tape containing the digitized log infomnation shall be submitted on ~ll lol~s for eopyin~ except experimental lo/~s, velocity surveys and dipmeter surveys. ~/any rivers in Alaska and their drainage systems have been classified as important for the spawnin/~ or migration of anadroraous fish. Opel, at ions in these areas are subject to AS 16.05.870 and the regulations p~omul~ated thereunder (Title 5, Alaska Administrative Code). Prior to commencing` operations you may be contacted by the Habitat Coordinatorts Office, Department of Fish and Game. Pollution of any waters of the State is prohibited by AS 46, Chapter 3, Article-7 and the regulations promulgated thereunder (Title 18, Alaska Administrative Code, Chapter 70) and by the Federal Water Pollution Control Act, as amended. Prior to con~aencin~ operations you may be contacted by a representative of the Department of Environmental Conservation. Mr. Robel~t T. Anderson Trading Bay Unit D-6 RD To aid us in scheduling field work, we would appreciate your notifying this office within 48 hours after the well is spudded. ~¥e would also like to be notified so that a representative of the Commission may be present to witness testing of blowout preventer equipment before surface casin~ shoe is drilled. In the event of suspension or abandonment, please give this office adequate advance notifioation so that we may have a witness p~esent. Very truly yours, i l/ ~ ,,.,' ' C. V. Chatterton Chail~aan of BY ORD~ OF THE Alaska Oil and Gas ~nservation ~isston Enc 10 sure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. CVC ~ be Union Oil and Gas ~son: Western Region Union Oil Company of California P.O. Box 6247, Anchorage, Alaska 99502 Telephone: (907) 276-7600 unl,a,n Robert T. Anderson District Land Manager February 2, 1982 Hr. Chat Chatterton Ak. Oil & Gas Conservation Committee 3001Rorcupine Drive Anchorage, Alaska 99504 WEST FORELAND AREA State of Alaska HcArthur River Field Dolly Yarden Rlatform, TBUS D-6 Rd. ADL-18729 (8-86-71-5575-601351) Dear Hr. Chatterton: Enclosed for your approval are three (3) fully executed copies of the above captioned Rermit to Drill TBUS D-6 Rd. from the Dolly Varden Rlatform. Also enclosed is our Check No. 19181 in the amount of $100.00 to cover filing fees. Very truly yours, sk Enclosures (4) cc: $. R. Callender A. Lannin-LA Office ECEIVEI) FEB 0 3 ]982 Alaska 0il & 6as Cons. C0mrnissi0~ Anchorage la. Type of work. STATE OF ALASKA ALASKA ~ AND GAS CONSERVATION CO""MISSlON PERMIT TO DRILl. 20 AAC 25.005 DRILL [] lb. Type of well EXPLORATORY [] SERVICE REDRILL [~ DEVELOPMENT OIL [] DEEPEN [] DEVELOPMENT GAS [] STRATIGRAPHIC [] SINGLE ZONE [[] MULTIPLE ZONE [] 2. Name of operator Union Oil Company of California* 3. Address P. O. Box 6247, Anchorag.e__A~_ 99502 4. Location of well at surface Leg B-l, Cond #2 673' FSL, 1220' FWL, Sec 6-8N-13W-SM , At top of proposed producing interval 2100' FNL, 1500' FEL, Sec 8-8N-13W-sM At total depth 2344' FNL, 1170' FEL, Sec 8-8N-13W-SM 5. Elevation in feet (indicate KB, DF etc.) ] 6. Lease designation and serial no. 106 'KB MSL I ADL-18729 A-926 12. Bond information (see 20 AAC 25.025) '- Type Blanket Drlg Bond Surety and/or number B-2-165-724-1 9. Unit or lease name Trading Bay Unit 10. Well number D-6RD 11. Field and pool McAt thur River Amount 15. Distance t'o near~st drilling or completed 13. Distance and direction from nearest town 14. Dist'ance to nearest property or lease line 21 mi. NW of Kenai miles 4180 feet well 1700- 16, Proposed depth (MD & TVD) 17. Number of acres in lease 18. Approximate spud date 906 IMD 3501 TVD feet 3085 02-03-82 19. If deviated (see 20 AAC 25.050) ~20. Anticipated pressures ¢¢¢¢ '~psig~_. KICK OFF POINT 9664 feet.M^x, oM HO, 32 °t(see 20 AAC 25.035 (c)(2)4~t'~~_2:' psig@ 2~ **Maximum possible surface psi=FP ( , ' ~ . ' Proposed Cas[ng~ Cementing Program' ~ feet Surface TO (TVD) *Based on survey taken on P-6 SIZE' / Casing Weight Hole 22. Describe proposed program: CASING AND LINER N-80 I Butt . . . Length 7006 ' SETT. I NG DEPTH MD TOP TVD ' 14995 ' 6900 ' I I 1 I MD BOTTOM TVD 13;9061 10;350 I QUANTITY OF CEMENT (include stage data} ]_z'00 sx. Plug existing wellbore and sidetrack @ 9664'MD in 9-5/8" csg. Drill 8-1/2" hole to projected TD @ 13,906'MD; 10,350'TVD. Run & cmL 7" liner (top & 6900'MD). Run tbg string & complete as a Hemlock injector. RECEIVED FEB 03 ]982 .. *Marathon Oil Company - SUb-Operator 23. ' hereby certify that the foregoing is true and correct tO the ~e~i~owledge SIGNED / ~..,/~.~ ~A'.~ TITLE n{~+. Land . --~ '-~' / ' i .... Mqr The s~ace below for. Commission use Robert Ti A~derson Alaska Oil & Gas Cons. Comm/ssioo Anchorage DATE 2/2/8,2 , , CONDITIONS OF APPROVAL "Samples required ] Mud log required []YES ~N0 ' / []YEs /~O ~ESOirecti°nalSurvey required'[]NO per'm~ nu~-~7--- - J Appr0-~-~i-al~late' ' , APPROVED BY .:~. ' --[ 7 / Form 10401 Rev. 7-1-80 JAPI number 50- ~33-' SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE February 9, 1982 by order of the Commission Submit in triplicate - MARATHON OIL GO.- -- DOLLY VARD£N PLATFORM -- Mu~ }/ Flowli~¢ -- Driilinc. j IXlipple- U 0 0 ~-~-~n ~-- C~W £winB- Bolt [oo o -- Dio,~r~m~ 2_ --13s/8"x 5,000~ Riser ~_ BOP _qfc~ck For Drillin~t From Uhclcr 133/6" .~ur{(~ce C~sing To T.D.-- RECEIVED · o o o,1 FEB 0 ~ 1982 ~~[]] Alaska Oil & Gas Cons. Comn~lssior~ Anchorage Well Room Floor C, ollc~r 1'3 ~/s" _Surface O~si.B 28" 33' C~onducto! .... · . . V~ MARATHON OIL i COMPANY,A.,, · . i DOLLY VARDEN PLATFORM l_i L :! :WELE NO D~'6 RD -]--i :: ' LEG' B"I CONDUCTOR 2 -~'-H"~-""i-:' SCAL-E'-'-I ":' I;000 ............. --I I' : "I' JULY; 20, '1981 , I ; I '! . : , ~ ; ' ~ i :i ~ BESSE, EPPS'E~ POTTS ;" ' : i , ru~ I ~,MER I CA N · . ..., i.i , i oo0 ;000' :000 7000 gO00 I 3000 · iL lc : Ex isting Well : ,%. : I 1 : i ! ; : "! ; ' IKOP "'"x ,_:_.... i L :' ~.; ....... ' TVD:6815 i '~.42o . Drop 2°/ I00' .................... :TMD=9664 ~'": "' 'X o ' ' ': ....... ': ' ' ·i . ; : ' DEP=6163 ~s',~° . i · ' ~ , ' ' :. ' ' [' : !' : i " ' i · TVD--7::555 '~," - ' i ' ' TMD=I0361 ~, !I !'ii! :': : : · ! ' ~E~=~5oo \i" . ' , ' ' ; TMD I 1000 , i ' i '. ' i i'i' !' :' ', 'i ' ''' : : i JX ' AVERAGE A, NGLE : ' ...: i :' :' .. : ' : ' ' : : ! ! i ~ X ". ~2° 18 ....... T-!'!-': ..... r"l-':T";',-~ .'." .... ;: .: t: ·, I ....... , i : ' . , , ' . . , ~ ' : ~' i.. ..,i ~-I:~ ~ !'. , .~ :: I'~ .~,, i 1'~~ i'~''~;'t ' · ' : , [ ," t ~ ' I 1 · : · , ' ~ , i . : ; : , I ; i ! : :- I' : :"' "*"""": '- ~' ' ;TARGETi : . i ' ' : "} '. [ : * ' ! -' ' i . ~ : ' ' '.TVD = 9700 \ : :' : ' ' ,'1- 'FFR h '~ 1QR9 = ;TMD =131 37 ~, · ...... : ....... i ...... !..:.i._).:..L-:_i-:.L: ..... ! ........ :-.:..-:-:-..i-.:..:-,~-,,-,., ..... ~,~,uc .... DEP='801 ' ~. ' ', ....... .: ' - 'i '' \ : ' ' J' ' ' , .' i'i! - .N;=l~Oii'&GasCon~.Commission , , . : . . ' ' /~chora~le ! 8 u L ~ ' TV D: I0350 ,l '" ~ : '. t .t TMD = 13906 t , : . ' , ! ' ' t ~ DEP = 8405 i I ]; 6000 7000 5000 DEPARTURE ALONG 'LINE OF SECTION i &-24 · 4 7 ~ :,/:./ I/ / ~ .~/ :~0;;4- I ,.,,'~ "-"'~ / / '/.i I / ;-"~e d I /oF.~ ~,~.L ~-: ~o '~ ::1:~-~ / / ~ . D-Il D-I ~-- j ~ i ..~,~.- .~,,~o /! i 5..,/ / I - DOLLY~ ~ ~"u -~'' 'D-3qA / ~ ~rd / 0 0 UN.- MRO KUS'E 7 KU '1 D c? "o~ D-22 ~ . ~o' .9~,?.O / · / · KU - IA .9~~,\ LEGE,~JD COMP PROD., B'I INJ. B-I -~- Pile' . S- I AbAND. 15 - ABAND. IN~. ~-~ · p BENCH -I WELL PTS. 982 3ns. Commission MARATHON OIL COMPANY ANCHORAGE DIVISION SHELL FC. FC-i FC-IA TRADING BAY UNIT McARTHUR RIVER FIELD 7" 2 HE MLOCK ~£NCi ~ - ', CONTOUR INTERV/~L -- I00 FT Author J L. rL'T3H I CHECK LIST FOR NEW WELL PERMITS Comp any Lease & Well No. ITEM APPROVE DATE (1) Fee (2) Loc y thru 8) thru 11) ~2 thru 20) (5) /. (6) Add:~ 2-c)~'~ · · 3. 4. 5. 6. 7. 8. · 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. YES NO Is the permit fee attached ........................................ ~~_ Is well to be located in a defined pool ................ Is well located proper distance from property line ..... Is well located proper distance from other wells ....... Is sufficient undedicated acreage available in this pool Is well to be deviated and is well bore plat included .. Is operator the only affected party .................... ' Can permit be approved before ten-day wait ............. Does operator have a bond in force .................................. Is a conservation order needed .................................... Is administrative approval needed ......... , ................... ~... Is conductor .string provided ...................................... Is enough cement used to circulate on conductor and surface ...... . __._ ~j~ Will cement tie in surface and intermediate or production strings . Will cement cover all known productive horizons ..~ ................ Will surface'casing protect fresh water zones ..................... . Will all casing give adequate safety in collapse, tension and burst Is this well to be 'kicked off from an existing wellbore ........... Is old wellbore abandonment procedure included on 10-403 .......... Is adequate well bore separation propoSed .......................... Is a diverter system required ....................................... Are necessary diagrams of diverter and BOP equipment attachedP ..... Does BOPE have sufficient pressure rating - Test to ~oc~o ~'g Does the choke manifold comply w/API RP-53 (Feb.78) Additional requirements ............................................. Additional Remarks: REMARKS Ge ol ogy: En .giBg~iug: -2C WVA ~ JKT~__~AD / rev! 01/13/82 INITIAL GEO. UNIT ON/OFF POOL CLASS STATUS AREA NO. SHORE Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPEN. DIXi ,, No Special'effort has been made to chronologically organize this category of information. PASE 1 PAGE 2 PAGE PAGE PAGE 5 PAGE PAGE 7 PAGE 8 PAGE PASE 10 PAGE 12 PAGE PAGE PAGE 15 PAGE PAGE PAGE PAGE PAGE 20 PAGE PAGE 22 PAGE PAGE 24 PAGE 25 PAGE PASE 27 PAGE 26 PAGE 29 PAGE ~o : ::