Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout219-0601. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program
Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: ______________________
Development Exploratory
Stratigraphic Service 6. API Number:
7. Property Designation (Lease Number): 8. Well Name and Number:
9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s):
11. Present Well Condition Summary:
Total Depth measured feet feet
true vertical feet feet
Effective Depth measured feet feet
true vertical feet feet
Perforation depth Measured depth feet
True Vertical depth feet
Tubing (size, grade, measured and true vertical depth)
Packers and SSSV (type, measured and true vertical depth)
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure:
13.
Prior to well operation:
Subsequent to operation:
15. Well Class after work:
Daily Report of Well Operations Exploratory Development Service Stratigraphic
Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas W DSPL
Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG
Sundry Number or N/A if C.O. Exempt:
Contact Name:
Authorized Title:
Contact Email:
Contact Phone:
2. Operator Name:
Senior Pet. Engineer: Senior Res. Engineer:
CollapseBurstTVDLengthCasing
Authorized Signature with date:
Authorized Name:
5. Permit to Drill Number:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge.
Size
14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283)
Gas-Mcf
measuredPlugs
Junk measured
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
3. Address:
4. Well Class Before Work:
Representative Daily Average Production or Injection Data
Casing Pressure Tubing PressureOil-Bbl
measured
true vertical
Packer
WINJ WAG
Water-Bbl
MD
15.Well Class after work:
Exploratory Development ServiceStratigraphic
16.Well Status after work:Oil Gas WDSPL
a GSTOR GINJ SUSP SPLUG
5.070, 25.071, & 25.283)
WINJ W AG
tion:
tion:
Gas-Mcf
Representative Daily Average Production or Injection Data
Casing Pressure Tubing PressureOil-Bbl W ater-Bbl
summary:
olumes used and final pressure:
epth feet
epth feet
true vertical depth)
d and true vertical depth)
Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown
Perforate Other Stimulate Alter Casing Change Approved Program
Perforate New Pool Repair Well Re-enter Susp Well Other: ______________________
Development Exploratory
Stratigraphic Service 6. API Number:
mber):8.Well Name and Number:
onic data per 20AAC25.071):10.Field/Pool(s):
ry:
ured feet feet
tical feet feet
ured feet feet
tical feet feet
CollapseBurstTVD
5.Permit to Drill Number:
Size
measuredPlugs
Junkmeasured
4. W ell Class Before W ork:
measured
true vertical
Packer
MD
Form 10-404 Revised 3/2020 Submit Within 30 days of Operations
By Samantha Carlisle at 11:22 am, Nov 05, 2020
ConocoPhillips Alaska, Inc.
PO Box 100360, Anchorage, AK 99510
219-060
50-103-20803-60-00
ASRC-NPR2, ASRC-NPR3, ASRC-NPR4, ASRC-AA0092344 CD5-98L1
None Colville River Field/Alpine Oil Pool
29480
7562
None
None
26819
7539
14159
7439
Conductor 80' 20" 120 120
Surface 2247' 10.75" 2286 2177
Intermediate 14325' 7.625" 14362 7480
Slotted Liner 12664' 4.5" 26825 7539
14182 - 26825
7443 - 7539
see attached
see attached see attached
14182' - 26825' MD
Please see attached summary
798 948 1082 1810 594
no test available
N/AKaylie Plunkett
Senior Production Engineer Kaylie Plunkett
Kaylie.B.Plunkett@conocophillips.com
265-6450
Scale Inhibition ✔
✔
✔✔
✔
Kaylie Plunkett Digitally signed by Kaylie Plunkett
Date: 2020.11.05 10:49:29 -09'00'
DSR-11/5/2020
RBDMS HEW 11/5/2020 SFD 11/5/2020
VTL 2/24/21
CD5-98 & CD5-98L1 Scale Inhibition Treatment
10/5/20 – 10/6/20
Hybrid Scale Inhibitor Squeeze Job pumped from 1700 hrs on 10/5/20 to 1600 hrs on 10/6/20.
LRS = Little Red Services
- Initial pressure TBG/IA/OA - 1885/1792/42
- LRS pumped 431 bbls WAW5206/Diesel/M209 preflush at 5.0 bpm, TBG/IA/OA - 448/1618/113
- LRS pumped 431 bbls Seawater and SCW3001 scale inhibitor at 5.0 bpm, TBG/IA/OA -
0/1573/173
- LRS pumped 3398 bbls Dead Crude/M209 overflush at 2.0 – 4.3 bpm, TBG/IA/OA -
490/1600/150
Interval treated:
CD5-98: 14362’ – 31468’ MD
CD5-98L1: 14182’ – 26825’ MD
Tubing: 4.5”, L-80, 14217’ MD, 7451’ TVD
Packer: Halliburton TNT Packer, 13935’ MD, 7379’ TVD
SSSV: None, no SSSV required.
7
O
N
O
rn
O
\
N
O
N
U
N
N
C
m
U 11:
10
U W
IO
U M
ID
U
IJ
U N
I�
U N
I0
U
JO
_U
}a>❑
7c
Q
cl
U>
a>❑
U>
CL
a�I
3:
a>❑
a
✓_+
E
rl
O
rl
O
col
O
ro
O
N
U>
U
U J
U J
U N
D
L
d
m
m
N
N>
m
m
m�
N
41
❑
❑
❑
❑
z
2
E
E
EX
E2
E
E�
E�
Ew
Ef
3
3
a
J
(/J
O
N LL'
C
(0 K
C
N a'
C
N l6
C
N
C
N
C
m
C
In ❑
❑
1(l J
J
J
Ifl J
N T
m-
N T
m E
N y
m V
N
❑ >,
❑
0
T
❑
T
❑ >,
❑
>,
❑
C
LL >
ll>
IL>
LL
LL�-
LL—
LL j
>
>
>
>
I>
>
ON
.N
N N
N y
m
NUI
N N
N N
m N
a
J
m
N y
N
fn
M O
In m
(n m
w.
.UI
a N
LL N
a N
a N
m N
U'
�I
O
�I
m
ofI
oou
U m
�I
U m
U N
�I
U N
�I
U N
�I
U N
❑
c N
N
N
m
'm z
N Z
m
d
❑d❑
d
C)E
❑ w
❑ U
❑ U
0,
l0LL
I0L
IL
IL
IL
I0L Q
N0
0
0
g 0
ov
'E
.gNm
.0 0
0a
04
0Q
oQ
0Q
0E
E
oN
OW
OoQ
cE
o
o
—
o
. _
o>o
c
�.E.E.E.E.F
mouoUo
oNon0
V
ON
Nro
=W
N
Nc0
�ro
=m
NN
NN
ON
NN
N
Y
W
O
W
LL
Y1
y
W O�
W rn
W rn
1m
W rn
WOE
WOE❑
Wrn
Wrn
W rn
W rn
WOE
Wrn
W rn
0
a
U
D rn
rn
rn
m
rn
rn
m
rn
m
m
m
rn
m
IL
a
> 0
0
0
0
0
0
0
0
0
0
0
0
0
W
L
M 1\
In
IA
IA
N
Y]
N
In
N
IA
in
IL
m
m
a m
m
a
rn
m
m
m
rn
m
a m
rn
O
W
O
0
V
0
J
_ _
O U
U
O
Z
u
N
O
M
O
O
QO
V
N
rn
m
rn
O
y
�
N N S
rn
N
Q
N
a
N
rn
N
J
d
N
v
aa,
0
o
GON
0
m
o
E
J
0
N
0 0
�
a:z
N
`Q
r
U
0 d
Z
rn
J f
s
Y
'
N
m_
d
0 0
W
J
J
�
Q
J
O
❑
oC
\)
U
H
01
Q
E
E
Z
0o
Z
EE
U
rn
0
m
z
0
�
m
m
m
m
m
m
m
m
m
m
m
m
0m
3
m N
Yo
N
N
N
m
m
N
N
N
m
m
N
m
m
m
m
m
m
m
m
m
m
75
m
aF,..
O
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
�
>
O
C7
N a m
�0
c0
co
�o
�o
co
co
�o
co
�0
i0
co
O)
Q
Z
N
0
a R
0
C
W a Z M
M
M
M
M
M
M
M
M
M
M
M
M
N
�
O
Q
a
E
E
—
0
z
0
,
o
O
O
m
c
w0
0:z
J
0
O U
U
U
U
U
U
U
U
U
U
U
U
U
j
Q
O
J
❑W
❑W
❑W
❑W
❑W
a
K
D
J
J m PO
W
W
W
W
W
W
7
0
c
C
C
N
^
o
pl
pl
E
O
p
fi
Z
f/1
vi
N
47
E
E
J
J
O
O
J
J
m
m
c
❑
of
of
p
�+
p
�+
NI
0
NI
0
NI
0
NI
0
w+
E
a
a
W
W
Z
o
O
o
O
JI
JI
❑
❑
p
p
K
3NQC�n
30Z
Of
J3
NV
.Q
Z
¢IfI
Z
?Vl
vQ>
NQ
I
u❑NV
F53
p 1
UIS
1
O
E
U
❑ E
U
p Z'
U
p Z
U;
p Z
Uy
a Z`
>
p 1
USU
p 1
p STppS
a
U.
U.
JmILL
E
I
Qy
I
I
I
I
Q
ISI
N
I.
_ I
W
a •y
UN
a 1
U m
a l
U m
I
a�
2
'
a NayU
p
pa'y
N
K1
Q
U
w
U w
U N
���
UN
(i
U N
U N
�
U m
U
U
I
bi
�o
d
ti
dZ
d Z_
d
d�I
d
d�1Z
mSr2
a
a
LL N
N
U
IL 0
U
LLO
L G
IL
L
L
yO
dm
.22
0.2
0
NN
NL
Cn.
C V
C V
N
V
C N
C N
CNCdCN
E
E
£
E
ESN
�JJ
_iV
E
E
E
E
m
E n
N
OJ
OD
Jm
Op
W I
VJp
N
OJ
Op
J
O
UJ
N
V J
0
UJ
c0
" E
O
E
m O
wrn
m
wrn
wrny
w�iE
wrn
wdi
turn
wm
Wrn
wrn
wrn
wm
wrn
wrn
wU
wU
0
�
�
Irn
U
rn
rn
rn
m
rn
rn
rn
rn
m
rn
rn
rn
rn
rn
rn
d
a
-
o
N
a
N
o
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
0
N
W
L
�
rn
�
m
N
rn
H
rn
N
rn
�
rn
to
rn
.
m
�
rn
H
rn
�
rn
N
N
N
N
N
a
rn
o,
rn
m
rn
W
0
U
m
U
C
V
J
Q
a
J
v
a
ON
a
L)
_
U
o
0
Q
rn
h
❑
m
A
a
F
2
C
�
o
GM
W
w
�
a3
m
w
J
y
cn,^
J
>
❑
Q
Jc
OV
o
Q
O
E
Q
Z
o
E
m
z
m
m
A
m
m
m
m
m
m
m
m
m
m
iy
m
m
m
m
m
3
�
p
p
m m
p
❑
m
O
m
p
m
p
m
p
m
❑
m
❑
m
O
m
p
m
O
m
p
m
p
m
❑
'.
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
'0
c
p
0
a
a
a
0
0
a
a
a
a
0
a
0
'0
a
rn
N
I
O
O
NU
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
U
OQ
m
❑
2
p
❑
❑
❑
p
p
p
❑
❑
❑
❑
10
p
O
a
a
a
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
w
V
E
0
0
O CD
O 0 O
o
ZO
n
3
3
3
3
0
0
3
3
m
o
U
O
O
O
O
O
O
O
O
W
W
W
W
W
W
W
W75
N N
r T
N
N
❑
N
❑
N
Cl0
W
❑
W
❑
W
❑
N
❑
U U
F F
C
m o Q
Z
Z Z
Z
Z
Z
Z
Z
Z
Z Z
1 p
y�
Or
U a m
rna
rnN
rna
mU
rn�
as
mN
rn9
w w
O O
W W
U U J
J
❑T❑
T❑
T❑
T❑
T
U a
T❑
U a
U a
T❑
U a
T❑
U d
U d
U a
U a
J J
a 2
a Z
a 2
a Z
d21
d Z
a 2
a Z
% i
J J
ILN
IL �j
IL �j
IL fn
LLN
LLN
llN
LLy
U U
N
Vi
U VI
V N
'C
U N
U N
.0
U N
_C
U N
U U
V• c,
�j
E N
oa
E
oa
C'W'Wa
N
oa
oa
C N
oa
N
oa
N
oa
C V1
mC,
(may
c
m
N
E
G E
u E
u E
u E
u E
u E
2m
u E
0¢ O¢
O
y
�)
N
a 0
d p
d 0
a p
a o
a 0
d 0
a o
m W m W
U
.m. in
Y
N
c
a
w U
w U
W U
W U
W U
W U
w U
W U
N T N S
m =_
❑
O
Q
a a
w
h
U
m
m
rn
m
m
m
rn
m
nut
m m
O'
N
N
N
pN
N
N
N
N
a y O
0 ❑
W
-
t
a
N z
aI
m
m
m
rn
m
m
o�
m
v m
W
O
C
Ot N d
V
Q
J
O
d
N W 6
E E
Z
U
m
W d N
Q
O
a7
A
y
O
J ¢ C
J
a
/�
li (D
O
N
U U
C O
c
O
p
a
N
N
O N
a
O
UU
E
¢
z
/}�\
m
Q
A
N
v C
�
o
F
Z
m
mC m
K
N
=
❑ a E
m
O E
N
a c
V/
>cl
J
= = O
Q
O
c
O
�
@
c
Q
E
a
U
2
In
m
m
m
m
m
m
m
m
m
m rn
a
N
❑
❑
❑
❑
❑
❑
❑
❑
m
C
Q
N O
f0
D7
D7
m
W
m
p
Ot
d
m
m
Z
�
W b
O
❑
❑
❑
❑
f5
❑
5
❑
❑
J
E
G�
W
E n
O
t+�
N
N
t7
M
M
M
M
th
N
U
p O
F
N
?
W
C
=
N
—
6
E
y
E
Z
pn d
2
N
G
N
=
O
W 1� m
w
V
m
o
O
Obi
y
Q
o o
Q
o 0
N
U
U
U
U
U
U
U
U
5
.� .0
U
On
-'o o
n mo
d
❑
O
❑
❑
❑
❑
❑
❑
❑
o
d
w
O ° o
O
Eo m
m
w
w
w
w
w
w
w
w
J
3
Z
U m 0
0
U K
V
E
d
A
E
0
U
P
0
v
a
O
O
O
M
O
O
0
Z
N
M
r
U
�
6
N
0
yz
Q
J
O
U
C
=
N
N
/F
LL
N
d
E5
O
CL
Q
n
=
a
0
0
W
U
d
0
C
0
J
o,
J
a�
d
o
=
N
o
0
0 N
N
r
E
E
o
U
y
Q
�
o
N
U
U
z
2
m
C
>
o
�
W
�/�
V/
J
JN
JQ
y
O
d
q
�
°
U
c
0
Q
e
n
E
Q
z
E
o
z
a
3
N
r
o
o
10
O
p
r
m
N
r
�
N
C
6 Y
E
� E
d
d
A
E
0
U
P
0
v
a
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
WELL COMPLETION OR RECOMPLETION REPORT AND LOG
1 a. Well Status: Oil ❑� • Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑
20AAC 25.105 20AAC 25.110
GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions:
1 b. Well Class:
Development 0 Exploratory ❑
Service ❑ Stratigraphic Test ❑
2. Operator Name:
ConocoPhillips Alaska, Inc.
6. Date Comp., Susp., or
Aband.: 8/9/2019
14. Permit to Drill Number/ Sundry:
219-060 -
3. Address:
P.O. Box 100360 Anchorage, AK 99510-0360
7. Date Spudded:
7/20/2019
15. API Number:
50-103-20803.60-00 '
4a. Location of Well (Governmental Section):
Surface: 281' FNL, 2402' FEL, Sec 18, T11N, R4E, UM
Top of Productive Interval:
247' FNL, 2833' FEL, Sec 12, T11N, RX, UM
Total Depth:
3186' FNL, 592' FEL, Sec 19, T11N, R4E, UM
8. Date TO Reached:
7/28/2019
16. Well Name and Number:
CRU CD5-98L7 '
9. Ref Elevations: KB:73.4 -
GL: 34 - BF:
17. Field / Pool(s):
Collville River Field/Alpine Oil Pool -
10. Plug Back Depth MDrrVD:
N/A
18. Property Designation:
A$RC-NPR4, ASRC-AA0092344,
ASRC-NPR2-ASRC-NPR3 '
41b. Location of Well (State Base Plane Coordinates, NAD 27):
Surface: x- 349576. y- 5965926 Zone- 4 -
TPI: x- 344327 y- 5971348 Zone- 4
Total Depth: x- 351254 y- 5957707 Zone- 4
11. Total Depth MDr VD:
29480/7562 •
19. DNR Approval Number:
932669,340757,932128
12. SSSV Depth MD/TVD:
N/A
20. Thickness of Permafrost MD/ VD:
1325/1320 '
5. Directional or Inclination Survey: Yes ❑� - (attached) No ❑
Submit electronic and printed information per 20 AAC 25.050
13. Water Depth, if Offshore:
N/A (ft MSL)
21. Re-drill/Lateral Top Window MD11VD:
14120/7429
22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days
of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential,
gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and
perforation record. Acronyms may be used. Attach a separate page if necessary RECEIVE
GR/Res SEP 0 9 2019
23. CASING, LINER AND CEMENTING RECORD
CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT
FT. TOP BOTTOM TOP BOTTOM PULLED
20 78.6 H-40 39 119 39 119 142 10 yds
10.75 45.5 L-80 39 2286 39 2177 f13.5 890sx 11.0ppg DeepCrete
7.625 29.7 L-80 37 14362 37 7480 19.875xl1 480sx 15.8ppg Class G
4.5 12.6 L-80 14161 26825 7438 7539 16.5 Slotted Liner
24. Open to production or injection? Yes [2] No ❑
If Yes, list each interval open (MDrrVD of Top and Bottom; Perforation
Size and Number; Date Perfd):
COMPLETION
A E
PERF PUPS @: ��
14182-26625 MD and 7539......6/1/2019 E
R--�FI ED
25. TUBING RECORD
SIZE DEPTH SET (MD) PACKER SET (MD/TVD)
41/2 14217 13935/7379
14159/7538
26. ACID, FRACTURE, CEMENT SQUEEZE, ETC.
Was hydraulic fracturing used during completion? Yes E] No Q
Per 20 AAC 25.283 (i)(2) attach electronic and printed information
DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED
27. PRODUCTION TEST
Date First Production:
9/4/2019
Method of Operation (Flowing, gas lift, etc.):
FLOWING MW/GAS LIFT
Date of Test:
4/2019 -ongoing
Hours Tested:
38
Production for
ITest Period
Oil -Bbl:
700
Gas -MCF:
684,000
Water -Bbl:
1400
Choke Size:
38 beabs
Gas -Oil Ratio:
975
Flow Tubing
Press. 900
Casinq Press:
1700
lCalculated
24 -Hour Rate
Oil-Bbl:Gas-MCF:
650.000
Water -Bbl:
1 a
Oil Gravity - API (torr):
37
Form 10-407 Revised 5/2017 Vn to14111 CONTINUED ON PAGE 2RBpMS '"BSEP t 0 2019 Sub `t O I NIAL only
28. CORE DATA Conventional Core(s): Yes ❑ No 0 • Sidewall Cores: Yes ❑ No 0 ,
If Yes, list formations and intervals cored (MDfTVD, Fromlro), and summarize lithology and presence of oil, gas or water (submit separate pages with this form,
if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071.
29. GEOLOGIC MARKERS (List all formations and markers encountered):
30. FORMATION TESTS
NAME
MD
TVD
Well tested? Yes ❑ No ❑�
If yes, list intervals and formations tested, briefly summarizing test results.
Permafrost - Top
Surface
Surface
Permafrost - Base
1325
1320
Attach separate pages to this form, 9 needed, and submit detailed test
Top of Productive Interval
14115
7428
information, including reports, per 20 AAC 25.071.
Formation @ TPI -Alpine C
C-30
2478
2321
K-3
6917
3732
Albian 97
7996
3984
Albian 96
9487
4494
HRZ
11210
5168
Kalubik
13091
6926
Kuparuk C
13489
7186
LC/Milureach
13720
7301
13729
7305
TD
29480
7562
Formation at total depth:
AI ine C
31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic
Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis,
in orwll test results. r 20 AAC 25.070.
32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge.
Authorized Name: G.L. Alvord Contact Name: Matt Smith
Authorized Title: Alaska Drilling Manager Contact Email: Matt.Smith2 co .com
Authorized / Contact Phone: 265-6337
Z-ot °L
Signature: (, l! /L Date: �let I
INSTRUCTIONS
General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram
with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical
reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted.
Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each
segregated pool is a completion.
Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection,
Observation, or Other.
Item 4b: TPI (Top of Producing Interval).
Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements
given in other spaces on this form and in any attachments.
Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00.00).
Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345),
and/or Easement (ADL 123456) number.
Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29.
Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of
completion, suspension, or abandonment, whichever occurs first.
Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool.
Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the
producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced,
showing the data pertinent to such interval).
Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain).
Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit
detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity,
permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology.
Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical
laboratory information required by 20 AAC 25.071.
Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and
other tests as required including, but not limited to: core analysis, paleontological report, production or well test results.
Form 10-407 Revised 5/2017 Submit ORIGINAL Only
CD5 - 98 Alpine A/C Dual Lateral Producer
Final Schematic
TNT Production Pa
at 13,945' MD
HP Sliding sleeve for
Selectivity
14,000' MD
3-1/2" 9.3# TN110SS
20" 94# H-40 Welded
Conductor to 115' MD
10-3/4" 45.5# L-80 TXP x BTC
Surface Casing at 2,286' MD
4-'/" x 1" GLM
4-112" 12.6# L-80 Hyd563
4%"x1"GLM
7 518" 29.7# L-80 TXP
Intermediate Casing at 14,362' MD
4-%" x 1" GLM
Upper Completion:
1) 4 1/2"-12.6# Hyd563 tubing
2) Shallow nipple profile 3.813" ID
3) 4-1/2"x 1" Carrico KBMG GLM (xx') w/DCK2
pinned for 2500 psi casing to tbg shear
4) SLB DHG
5)TNT Packer
6) X Nipple profile, 2.813"
7) TNT Packer
8) XN Nipple profile, 2.813"
Lower Completion:
8) Plop and drop liner in C sand
- no junction
-4.5" 12.6# L-80 w/ perf pups
9) ZXP liner top packer & Flexlock Liner Hanger
XO 5" Hydril 521 Box X 4-%" H563 pin
-4.5" Hydri1563 12.6# L-80 w/ Frac Ports
C sand Lateral
6 1/2" Hole TD
14,134'- 29,480' MD
4 %" 12.6# L-80 Hyd563 Liner w/ perf pups
0 0 0 0 0 0 0 0
4 %"
TNT Production Packer A sand Lateral
at 6 1/2" Hole TD
14,169' MD ZXP liner top packer 14,341' — 32,468' MD
at 14,200' MD
ports to
CorwomPhillips
Alaska. Inc.
WNS PROD WELLNAME CD5-98 WELLBORE CD5-98
AST WO:
clwae. asm+a 94pn AM
Last Tag
VervckacnenmEc leceull
AnnoWlon
pepM MKB1 For Date WeI1Wr0
Lae, MM ey
HANGED; XO
LAST TAG:
CD5.98
jerown
.............. Last Rev Reason
................. _......._..........
Annotation, End ptWeIIWre
LasIMM By
019Doh
Rev Reason: Post Frac Wellwork X2019
claylg
...............................................................
Casing Strings
Casino Description
CONDUCTOR
OD(in) ID lint TOP Mx01 0tleephoMKa1 Se, OeptN nVD1... ft"n B... Graee
A 1925 39.5 119.5 1194 94.00 H40
Top Th,.
CpineDeacN,
SURFACE
Do ON IDlln) TOPIMKB) SeYDepM IrH,B) Set ppM lP/OL.. ML"11... GrMe
ID3/4 988 39.2 2,286.2 2,177.2 45.50 L-80
Tap Ttrrne
TXP-M
CONDUCTOR 941194
Cape.Oeacrlptlon
INTERMEDIATE
Do (in) To (In) TOppa(Bi ISIN DePM MKS) Set DapN(Past MLen 11 Grate
7518 6.88 3].3 14,3619 7,4802 2930 L.
Top IDrtae
TXP-M
suRPACE; Oe.x-2-o-
Caging patent
ASAND LINER
ODlln1 ID rn) raP MKEe Is. Depas Mass an, Depth jTVD1... vNLen ll... Graee
4112 3.96 14200.1 31468.0 7,7164 12.60 L-80
Tap Th.
IHyd563
Liner Details
NIPPLE, 2,4710
Top(mcB) Too (TVD)Mouls Top net mmlMa open
Nwnmelto
Ms
14,220.1
7,451.8 77.15 RACKOFF "RS" Rackoff Seal Nipple
4,270
GAS LIFT; 5,3147
14,222.2
74522 77.11 HANGER "DG Flex -Lock Liner Hanger
4.620
14,229.3
74538 77.1 XO, 55 H553P x 5 HUIB
3.920
REDUCING
GAs uFr;ly4Ta,
14,8232
],518.9 8.3 FRACSLEEVE Baker ac seeve# ,Hytl563
2645
2.645" OD Ball
15,5518
7522.8 81 FRACSLEEVE Sake acsleeve O, Hyd
2.595
2,9".
595" OD Bell
16441.9
7,5233 06 FRACSLEEVE Baer acsleeve#19.Hyd563
2515
2.515' OD Ball
Gas DVT', 1SINIX
17,249.9
7,532.1 8690 FRAC SLEEVE aker acsleeve#18, ytl 3
2495" OD Ball
2.495
-' 9
],5355 90.68 FRACSLEEVE er csleeve plJ, Hytl563
455
W11."EURNIPSENSOR:
---1
2455" OD Ball
+Aetna
T6-655
],556.3 86.68 FRACSLEEVE U.Malt.rdernessISHY663
2415
PACKER; 139347
2415 OD Ball
19,3934
7,93.9 8905 FRACSLEEVE B.N.1foacSienevES15, Hyv563
2.375
2375" OD Bali
EUDWG SLEEVE: I.J.4
20.203.2
7,5M 89.58 FRACSLEEVE Baker larsheave.X4. hyd563
2335
2.335' OD Ball
21,0132
7.5800 90.11 FRACSLEEVE Baker ft=sleeve #13, Hyd563
2.295
2295" OD Ball
xl%+1E: P.011`31,8162
7598.4 89,81 FRACSLEEVE Baker fins,sleeve #12. Hyd563
2255
1255" OD Ball
27621.7
7,595.8 90.04 FRACSLEEVEaer acsleeve#11,Hyd5
2215
2215' OD Ball
PACKER; 14.1591
3,46)
7,602.6 89.31 FRAC SLE VE a r acsleeve #10, Hy
DS
2.1)5" ODS,
NIPPLE; Wake
24.075T
7,613.3 88.82 FRACSLEEVE Base.sleeve#9, Hytl563
2.15
Lo..R. le Mr.
2.135' GO Ball
MOLE ..RE, 1eM71
25, 41.
7,6274 89.01 FRACSLEEVE .7 raz sleeve #8, Hytl563
" Dept
---2"W5
25,725.6
7,6390 Islas.FRACSLEEVE Baker Mae sleeve #7, Hyd563
2.55
2055" OD Ball
26,5.5
7,6540 86.32 FRAC SLEEVE Baker few sleeve #, Hytl56
.15
2.015 OD Ball
wTERMEOIATE, 31.8+4sMe
27747
],99.8 8863 FRACSLEEVE a r Tac sleeve N5, Hytl563
1. 75
1.9)5.OD Ball
28,156'S
),689.9 8975 FRAC SLEEV aer csleeve#4, Hytl
19M
1.935' OD Ball
28,962.5
7,694.8 8934 FRAC SLEEVE #3,Hyd563
1895
OaD B 11
29,768.3
7,704.1 8950 FRACSLEEVEaer Tart sleeve#2, 11'0563.855
185 OD Ball
X 572 6
77114 89.51 FRACSLEEVEer csleeve#1, Hyd993
1.815
1.815" ODD,
Tubing Strings
Tubing Descripion String
TUBING PROD 4112
Me...IDlm1 T.p'MEel set Depth (n.. Ott Dept n lND1 l...vn Mdn) Jere ee rapeonneexpn
3.96 35.0 14,2166 ),4510 12.60 L-80 Hytl563
Completion Details
TRPPVD)
Top MKS) MIKEN
ha N21
PI IMm Dee Com
Nominal
ID On)
350 35.0
000 HANGER FMC 4-112" Tubing Hanger Hydnl HYD 563
3958
2,4710 2315-7
43.77 NIPPLE NIPPLE,IANDIN ,4 la -,W.787 H563
181
13,9109 7.371.7
71.39 AUGE7 PUMP SLB Solid Gauge Malrcleal w/ 11mm encapsulated I wire, 11563
3.884
SENSOR
1 2 7,3787
7203 XO-REDUCIN XO PUP, 41011ydnl 563 x3-117'8563 pin
2992
1 7 ),339.1
7207.PACKER Halliburton TNT Packer, -11T 11563
2SOD
13,90 .4 73966
73.53091 -N7 -SLEEVE SLIDING, 3-11 ' AP - LB, X Profile, Up
2.813
SLEEVE t0 open
14,On1 7418.9
75. NIPPLE NIPPLE ,IANDING,312",X,2.813",Hydn1563-High Burst
.13
14,159.1 ),438.3
A.18 PACKER Halliburton TNT Packer, 312" H58
2.900
14,176.5 ],4422
77.37 NIPPLE NIPPLE,IANDING.312',XN, 281 ",EUE 80
2750
14,198.8 ],4186
JZ27 LOCATOR Baker Me emcal ocabq EUE rd M1ear screws 'below
3000
b a or)
14,19].7 7,44.8
77.26 MULE SHOE Baker VJLEG
2,980
A Rise LINER, tope I
m.awo
wNs PROD WELLNAME CDS-98 WELLBORE CD5-98
ConocoPhillips
AIH.�� II1�
F- I E:::]
c0s3a. s.vm+3.aao z3AM
Mandrel Inserts
wma a<nam,m PotiM1
n
w
R:%O
..............................
__........
on Tap11V0)
M TOPIRKBI Otl(B) Make
MaMI
ODllnl 3ery
ypq
TyW
Tp
Type
PoILSIxe
Ilnl
TRO Run
(M1) Run Oap5,314]
3,41D Gamm
KBMG
1GAS LIFT
GLV
BK
0.188...............
.............114761
5,4160 Gamm
KBMG
1 GAS LIFT
GLV
BK
0.1813,8449
7349.5 Camco
KBMG
1 GAS LIFT
OV
BK
U."Notes:
General & Safety
Annoblion
tt
NOTE'. VieWScllemaiicw/AlaskaSchema1ic100
0.1184ZVM.]��1,411H
G LIFT: 5.3L]
GIS LET. 11.48 .1
Gab LIFT:IRSM.B
GLUGE PUMPSENSOR:
1Z.OH
ngC EE: +%.1
SLIOIW SIEEVE: 13.91M.4
NIPPIE: 14.073
Pg MR: I4,IW.1
NIPPIE: 10.18.E
LOCATOR: 14,1WB
MULE$H0E: 1418].]
INTERMEDIATE', W,314W+9
A SAND LINER: I41M 1-
31..O
___wry, WNS PROD WELLNAME CDS-98 WELLBORE CD5-98L1
ConocoPhillip$ Well Attribul Max Angle e l TD^^^
Freta Name WeOan gpVUW1 W¢IIMne 91aNs ncl^^) MO'. A[(Bim lXNe)
Al8$kd IUC. ALPINF ECIDT9ni'mT Donn u
CO66BL1,&VAfB8i0'.RAM
Last Tag
VxYWVJuaNN:tamal
AnnoMon
Nil EM Oad Wellpon
Las ttMM 81
WWCPRE00
LAST TAC'
CDS98Lt
jennall
.........................._._............. ......._
Last Rev Reason
Annimation
Ene Oah Wcnlnre
umtml
.............................................................. .......... _.
Rev Rea50n: IATERAL
9/5/2019 CD5-98L1
ennalt
Casing Strings
Gsin9 Des[npTE (in)
C SAND PO,TED LINER 412
IO tin)
3.96
Top tNNB) Sel Oep011flNB) Sel Cepin tNOj... WVLen tI.. Glabe
14,1014 26,825.0 J,5389 12.60 L-80
Top TN,eab
H563
::j
Liner Details
CONOUCTOR'E41t9A
Top INN81 Tani tNNB)
Top 110
Il Orc
Com
Nominal l0
(in)
14,1514 7.4386
A.16
ETTIN
HRDE Liner Setting Sleeve 5" x TL -80
4.200
9VRPACe3B.T0.202
SLEEVE
14,1]].1 1,4420
11.9p
X0,5" H527.4.5"H5fi3 pm pin
3.958
NIPPLE; 2x10
I
jX0
REDUCING
Notes: General & Safety
OA9 urr. 5.93<1
End D.
Annotation
9/512019
NOTE: Vi WSChematiCW/Alaska Schematic10.0
3AS UFT; n,M 1
G93 Ul 198N.p
OA VPUMPMNSOR;
19.9109
PACKER: 13Wa.7
9DUWG &&EMIL 13,%0.4
N11iii 1407)3
INTERMEDIATE: V 310.3019
o -u
C 6AND PORTEp LINER;
10.161.0.]6,0150
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(ftKB)
End Depth (KKB)
6/4/2019
6/4/2019
1.00
MIRU
MOVE
RURD
P
Mobilize rig to CD5-98.
0.0
0.0
12:00
13:00
6/4/2019
614/2019
1.50
MIRU
MOVE
RURD
P
Scope Derrick down.
0.0
13:00
14:30
SIMOPS: Disconnect air, water, steam
interconnects.
6/4/2019
6/4/2019
1.00
MIRU
MOVE
RURD
P
Lower Cattle Chute on Rear Pipe
0.0
0.0
14:30
15:30
Shed Roof.
SIMOPS: unbridle traveling blocks, pin
top drive, continue disconnection of
interconnects.
6/4/2019
6/4/2019
1.00
MIRU
MOVE
RURD
P
Secure traveling blocks and energy
0.0
0.0
15:30
16:30
track, continue disconnecting
interconnects. Swap to cold start
power. Disconnect electrical
interconnects.
6/4/2019
6/4/2019
1.00
MIRU
MOVE
MOB
P
Prep to Skid rig floor.
0.0
0.0
16:30
17:30
SIMOPS: Stomp pump module away
from pits module.
6/4/2019
6/4/2019
2.00
MIRU
MOVE
MOB
P
Skid rig floor to move position.
0.0
0.0
17:30
19:30
1
1
1SIMOPS: Move pits complex.
614/2019
6/4/2019
3.50
MIRU
MOVE
MOB
P
Lower Derrick.
0.0
0.0
19:30
23:00
SIMOPS: Move Casing shed; change
out tire on pits complex.
6/412019
6/5/2019
1.00
MIRU
MOVE
MOB
P
Separate Pipe Shed module from sub.
0.0
0.0
23:00
00:00
SIMOPS: Continue Change of tire on
pits complex.
6/5/2019
6/5/2019
2.50
MIRU
MOVE
MOB
P
Continue to stomp pipe shed away
0.0
0.0
00:00
02:30
from Sub. SIMOPS: Complete tire
change on pits complex.
6/512019
615/2019
2.50
MIRU
MOVE
MOB
P
Hook up Sow to Pipe shed and
0.0
0.0
02:30
05:00
mobilize away from Sub. Stomp Sub
off Of CD5-24.
SIMOPS: move rig mats for use in
moving Sub on pad for upcoming
movement.
6/5/2019
6/5/2019
1.00
MIRU
MOVE
MOB
P
Hook up Sows to Sub and start pulling
0.0
0.0
0500
06:00
sub onto and down CD5 pad.
6/5/2019
6/5/2019
3.00
MIRU
MOVE
MOB
P
Spot sub and unhook Sow and Jeep.
0.0
0.0
06:00
09:00
Stomp Sub over CDS-98. Level and
Shim Sub module.
SIMOPS: Stage Pit module near Sub
module.
6/5/2019
6/5/2019
2.00
MIRU
MOVE
MOB
P
Set Rig mats for pipe shed module
0.0
0.0
09:00
11:00
spot.
SIMOPS: Spot Pump module near pits
module.
615/2019
6/5/2019
1.00
MIRU
MOVE
MOB
P
Spot pipe shed module near Sub with
0.0
0.0
11:00
12:00
Sow.
615/2019
6/5/2019
0.25
MIRU
MOVE
MOB
P
Unhook and release Sow form Pipe
0.0
0.0
12:00
12:15
Shed module once spotted.
615/2019
6/5/2019
3.00
MIRU
MOVE
MOB
P
Stomp Pipe Shed to Sub, spot, shim
0.0
0.0
12:15
15:15
and pin module.
615/2019
6/5/2019
1.00
MIRU
MOVE
MOB
P
Raise Derrick (w/ PJSM), retract and
0.0
0.0
15:15
16:15
store raising rams.
SIMOPS: Spot motor complex near
pump module with Sow.
6/5/2019
6/5/2019
0.75
MIRU
MOVE
MOB
P
Skid Rig Floor to drilling position.
0.0
0.0
16:15
17:00
SIMOPS: Spot rasing shed near pipe
shed with Sow.
6/5/2019
6/5/2019
2.00
MIRU
MOVE
MOB
P
Spot casing shed into place with
0.0
0.0
17:00
19:00
stompers. Spot Pit module into place
with stompers.
Page 1/58 ReportPrinted: 8/1212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
sten Depth
Start Time
End Time
Dv(hr)
Phase
Op Co.
Ac" Code
Time P -T -X
Operation
(flKB)
End Depih(WO)
6/5/2019
615/2019
1.50
MIRU
MOVE
MOB
P
Spot Pumps module next to Pits
0.0
0.0
19:00
20:30
module with stompers.
6/5/2019
6/5/2019
1.50
MIRU
MOVE
MOB
P
Spot Motors module next to Pumps
0.0
0.0
20:30
22:00
module with stompers.
6/5/2019
6/6/2019
2.00
MIRU
MOVE
RURD
P
Raise Cattle Chute.
0.0
0.0
2200
00:00
SIMOPS: switch to 3516 Cat power.
6/6/2019
6/6/2019
2.50
MIRU
MOVE
RURD
P
Unpin Top Drive, Inspect Derrick, Rig
0.0
0.0
00:00
02:30
Up and Scope Up Derrick, Connect
Kelly Hose on Rig Floor, Disconnect
Scoping Lines.
6/6/2019
6/6/2019
3.50
MIRU
MOVE
RURD
P
Lower Down Cellar and install flooring.
0.0
0.0
02:30
05:00
Work on Interconnect Hoses,
stairways, post well sign and other
signage, trim Herculite, Centrifugal
Pumps, Handrails, Water, Steam, Air
to all modules. Function Test Pipe
Shed equipment. Drain Lines to BOP
deck. Work on Rig Acceptance
Checklist.
RIG ACCEPTED: 06:00
6/6/2019
6/6/2019
2.00
MIRU
MOVE
RURD
P
Change Out Saver Sub, Die Blocks
0.0
0.0
06:00
08:00
and Bell guide to 4.51F (w/PJSM).
SIMOPS: Test Eddie Pump and Lines
to Ball Mill.
6/6/2019
6/6/2019
4.00
MIRU
MOVE
RURD
P
Remove Knife Valve and Pup from
0.0
0.0
08:00
12:00
Diverter Tee, install blanking Flange.
NU Diverter Tee, 17.5" Riser and
Surface Bag.
SIMOPS: Onload 9.6ppg DrillPlex
Spud Mud to pits.
6/6/2019
6/6/2019
5.00
MIRU
MOVE
NUND
P
NU Surface stack. Torque all bolts on
0.0
0.0
12:00
17:00
Diverter Tee, Riser, Bag. Move Flow
Box into position and seal. Install
Riser, MU Flow line, Jet lines, Hole Fill
line.
SIMOPS Continue loading 9.6ppg
DrillPlex Spud Mud to pits.
6/6/2019
6/6/2019
2.00
MIRU
MOVE
SLPC
P
Slip and Cut 141'(18 wraps) of drilling
0.0
0.0
17:00
19:00
line. Calibrate blocks, check Crown -0 -
Matic, lop drive inspection post saver
sub change out.
6/6/2019
6/6/2019
1.50
MIRU
MOVE
RURD
P
Clean, Repair and Install PVC Low
0.0
0.0
19:00
20:30
Pressure Riser. Air up all boots and
calibrate TOTCO and Flow Paddle.
SIMOPS: Check SLB Standpipe
Transducer.
6/6/2019
6/62019
2.75
MIRU
MOVE
PULD
P
PU NMDC, Jars and 5" HWDP. Build
0.0
0.0
20:30
23:15
Stands and rack back in Derrick.
6/6/2019
6/6/2019
0.50
MIRU
MOVE
RURD
P
Flood All surface mud lines and
0.0
0.0
23:15
23:45
Pressure test HP Mud Lines from Mud
Pumps to Top Drive, 500 psi / 3500
psi. Test Jet Line and Flow Paddle. Fill
Hole: 52 bbls.
6/6/2019
6/7/2019
0.25
MIRU
MOVE
SFTY
P
Pre Spud Meeting for well and PJSM
0.0
0.0
23:45
00:00
for PU BHA#1 (Surface interval BHA).
6/7/2019
6/7/2019
0.50
MIRU
MOVE
SFTY
P
Continue Pre -Spud meeting and
0.0
0.0
00:00
00:30
PJSM on PU of BHA#1 for Surface
Interval.
6/712019
6/7/2019
3.00
MIRU
MOVE
BHAH
P
PU BHA#1 for surface interval per
0.0
0.0
00:30
03:30
SLB and Gyro Representatives.
6/72019
6/7/2019
0.50
SURFAC
DRILL
DDRL
P
RIH,Shallow Hole Test of BHA.
0.0
120.0
03:30
04:00
Contact bottom at 120' MD.
Page 2158 Report Printed: 811212019
a Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan oepN
Stan Time
End Time
Our (m)
Phase
Op Code
Activity Cone
Time P -T -X
Operation
(WB)
End DBPN (ftKB)
6/7/2019
6/7/2019
2.00
SURFAC
DRILL
DDRL
P
Drill 13.5" hole from 120'MD to
120.0
281.0
04:00
06:00
281'MD, 281' TVD, 550 GPM, 850
PSI, 50 RPM, 2k TQ, 2-4k WOB; off
bottom = 750 PSI, PU = 62k, SO =
62k, ROT = 60k, TQ = 5k. AST = 0,
ART = 1.04, ADT = 1.04, Total Bit
Hours = 1.04, Total Jars = 129.62.
6/7/2019
6/7/2019
6.00
SURFAC
DRILL
DDRL
P
Drill 13.5" hole from 281'MD to
281.0
793.0
06:00
12:00
793'MD, 793' TVD, 500 GPM, 1040
PSI, 60 RPM, 3k TQ, 5-25k WOB; off
bottom = 900 PSI, PU = 80k, SO =
89k, ROT = 88k, TQ = 1 k. AST = 0.71,
ART = 2.59, ADT = 3.3, Total Bit Hours
= 4.34, Total Jars = 130.44.
6/7/2019
6/7/2019
5.50
SURFAC
DRILL
DDRL
P
Drill 13.5" hole from 793'MD to
793.0
1,319.0
12:00
1730
1319'MD, 1312' TVD, 500 GPM, 1120
PSI, 85% NO, 60 RPM, 5-6k TO, 8-
1Ok WOB; off bottom = 1020 PSI, PU
= 96k, SO = 96k, ROT = 96k, TQ = 2k.
AST =1.12, ART = 1.84, ADT = 2.96,
Total Bit Hours = 7.3, Total Jars =
133.4.
6/7/2019
6/7/2019
0.50
SURFAC
DRILL
SVRG
P
Service Rig. Rig Inspections. Change
1,319.0
1,319.0
17:30
18:00
out hose in Ball Mill. Work on Mud
Pumps.
6/7/2019
6/7/2019
1.50
SURFAC
DRILL
RGRP
T
Troubleshoot Amphion System for Rig
1,319.0
1,319.0
18:00
19:30
Pump problem. Reboot of Amphion
System brought Rig Pumps back on
line.
SIMOPS: Replace hose in Ball Mill.
C/O Packing on charge pump.
6/7/2019
6/8/2019
4.50
SURFAC
DRILL
DDRL
P
Drill 13.5" hole from 1319'MD to
1,319.0
1,699.0
19:30
00:00
1699'MD, 1676' TVD, 600 GPM, 1550
PSI, 49% F/0, 60 RPM, 3-4k TO, 5-8k
WOB; PU = 100k, SO = 105k, ROT =
94k, TQ = 4k. AST = 0.39, ART = 1.74,
ADT = 2.13, Total Bit Hours = 9.43,
Total Jars = 135.53.
6/8/2019
6/8/2019
1.50
SURFAC
DRILL
DDRL
Drill 13.5" hole from 1699'MD to
1,699.0
1,795.0
00:00
01:30
1795'MD, 1765' TVD, 600 GPM, 1550
PSI, 49% FlO, 60 RPM, 34k TQ, 7-8k
WOB; off bottom = 1361 PSI, PU =
100k, SO = 105k, ROT= 104k, TQ =
1.5k. AST =1.12, ART = 1.84, ADT =
2.96, Total Bit Hours = 7.3, Total Jars
= 133.4.
6/8/2019
618/2019
0.50
SURFAC
DRILL
SVRG
P
Service Rig. Lubricate/Service Top
1,795.0
1,795.0
01:30
02:00
1
1
Drive. Work on Amphion System.
6/8/2019
6/8/2019
2.00
SURFAC
DRILL
RGRP
T
Troubleshoot Amphion System for Rig
1,795.0
1,795.0
02:00
04:00
Pump problem. Reboot of Amphion
System multiple times, Rig Pumps
back on line.
618/2019
6/8/2019
2.00
SURFAC
DRILL
DDRL
P
Drill 13.5" hole from 1796MD to
1,795.0
1,883.0
04:00
06:00
1883'MD, 1844' TVD, 610 GPM, 1587
PSI, 49% F/O, 60 RPM, 3-5k TQ, 15k
WOB; off bottom = 1300 PSI, PU =
108k, SO = 106k, ROT = 106k, TQ =
1.5k. AST =1.23, ART = 1.16, ADT =
2.39, Total Bit Hours = 11.82, Total
Jars = 137.92.
Page 3158 Report Printed: 8112/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
sten Depth
Stan Time
End nme
Our (hr)
Phase
Op code
Activity Code
Time P-T-X
Operation
(ftKB)
End DepN mKB)
6/8/2019
6/8/2019
5.50
SURFAC
DRILL
DDRL
P
Drill 13.5" hole from 1883'MD to
1,883.0
2,296.0
06:00
11:30
2296'MD, 2184' TVD, 780 GPM, 2375
PSI, 49% F/O, 60 RPM, 4-6k TO, 12-
22k WOB; off bottom = 2130 PSI, PU
= 111k, SO= 110k, ROT= 110k, TQ =
2.5k. AST =1.07, ART = 2.38, ADT =
3.45, Total Bit Hours = 15.27, Total
Jars = 141.37.
6/8/2019
6/8/2019
0.50
SURFAC
CASING
CIRC
P
Pump 40bbl bit balling sweep;
2,296.0
2,218.0
11:30
12:00
Circulate @ 795 GPM, 2220 PSI, 60
RPM, 2-3k TQ. Rack back 1 stand
while pumping bit balling sweep during
BU from 2296' MD to 2218' MD.
6/8/2019
6/8/2019
1.00
SURFAC
CASING
CIRC
P
Circulate @ 795 GPM, 2160 PSI, 60
2,218.0
1,985.0
12:00
13:00
RPM, 2-3k TQ. Rack Back 1 stand per
BU from 2218' MD to1985' MD;
15,640 strokes total.
6/8/2019
6/8/2019
0.50
SURFAC
CASING
OWFF
P
Observe Well for Flow for 30 min
1,985.0
1,985.0
13:00
13:30
(STATIC); 5 rpm, 2-3k TO; Blow Down
Top Drive.
6/8/2019
6/8/2019
1.50
SURFAC
CASING
TRIP
P
POOH from 1985' MD to 850' MD
1,985.0
850.0
13:30
15:00
racking back stands of 5" DP in
derrick. UW 90k, DW 90k.
6/8/2019
6/8/2019
0.50
SURFAC
CASING
OWFF
P
Observe Well for Flow (STATIC).
850.0
850.0
15:00
15:30
PJSM for laying Down BHA.
6/8/2019
6/8/2019
3.50
SURFAC
CASING
BHAH
P
Rack Back all HWDP stands. Lay
850.0
0.0
15:30
19:00
Down BHA per SLB DD Rep.
6/8/2019
6/8/2019
0.75
SURFAC
CASING
CLEN
P
Clean and Clear Rig Floor.
0.0
0.0
19:00
19:45
6/8/2019
6/8/2019
1.75
SURFAC
CASING
RURD
P
Rig Up to Run 10-3/4" Surface Casing,
0.0
0.0
19:45
21:30
Drain Stack, MU Pup to Landing Joint.
Dummy run Surface Hanger.
6/8/2019
6/8/2019
0.25
SURFAC
CASING
SFTY
P
PJSM Run Surface Casing.
0.0
0.0
21:30
21:45
6/8/2019
6/9/2019
2.25
SURFAC
CASING
PUTB
P
MU Shoe Track with Baker Lock. TO
0.0
280.0
21:45
00:00
connections to 23k. Check Boats
(GOOD). Continue Casing run of 10-
3/4" Casing to 280' MD fill every joint.
6/9/2019
6/9/2019
7.00
SURFAC
CASING
PUTB
P
Continue Pick Up 10-3/4" Casing from
280.0
1,510.0
00:00
07:00
280' MD to 1510' MD, fill every joint
and top off every 10.
6/9/2019
6/9/2019
0.75
SURFAC
CASING
CIRC
P
Circulate BU staging up pumps. ICR
1,510.0
1,510.0
07:00
07:45
2 bpm, 160 psi, PVT 131 BBLs, F/O
57%. 2.5 bpm, 150 psi, PVT 131
BBLs, F/O 40%. 3 bpm, 140 psi, PVT
131 BBLs, F/O 40%. DW: 89k. 3.5
bpm, 146 psi, PVT 130 BBLs, F/O
56%. DW: 87k. 4 bpm, 170 psi, PVT
127 BBLs, F/O 56%. DW: 84k. 4.5
bpm, 189 psi, PVT 130 BBLs, Flo
34%. DW: 88k. 5 bpm, 209 psi, PVT
131 BBLs, F/O 33%. DW: 87k. 5.5
bpm, 231 psi, PVT 131 BBLs, F/O
31%. DW: 86k. FCR 6 BPM, 251 psi,
PVT 131 BBLs, F/O 34%. UW: 97k
DW: 85k. 165 BBLs pumped.
6/9/2019
6/9/2019
2.25
SURFAC
CASING
PUTS
P
Continue Pick Up 10-3/4" Casing from
1,510.0
2,244.0
07:45
10:00
1
I
1510' MD to 2244' MD, fill every joint
and top off every 10.
6/9/2019
6/9/2019
1.00
SURFAC
CASING
PUTB
P
MU FMC 10-3/4" Casing Hanger and
2,244.0
2,286.0
10:00
11:00
Landing joint as per FMC Rep. Wash
1
to bottom, UW = 120k, DW = 107k,
Land Hanger @ 2,286' MD.
Page 4/58 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
somt Depth
Stan Tene
End Time
our (hr)
Phase
op Code
Aaiviry Code
Time P -T -X
Operation
(AKS)
End Depth (RKB)
6/9/2019
6/9/2019
1.00
SURFAC
CEMENT
CIRC
P
Circulate and condition mud staging
2,286.0
2,286.0
11:00
12:00
up to 8 bpm, 130 psi. UW 126k, DW
123k
6/9/2019
6/9/2019
2.00
SURFAC
CEMENT
CIRC
P
Circulate Reciprocate Pipe while
2,286.0
2,286.0
12:00
14:00
conditioning mud @ 8 bpm, 285 psi,
UW 133k, DW 125k.
SIMOPS: Blow Down Top Drive and
Rig Up Cement Lines. PJSM Surface
Cement Job.
6/9/2019
6/912019
4.00
SURFAC
CEMENT
CMNT
P
Cement Surface Casing per SLB
2,286.0
2,286.0
14:00
18:00
Cementing Schedule. PT Lines 1500
psi / 3500 psi. Pump 75 BBLs 10.5
ppg Mud Push, 4.7 bpm @ 72 psi;
Drop Bottom Plug; Pump 302.6 BBLs
Lead Cement, 4.1 bpm @ 140 psi;
Pump 60.2 BBLs 15.8 ppg Tail
Cement, 1.8 bpm @ 126 psi; Drop Top
Plug; Pump 20 BBLs Fresh Water;
Chase with Rig Pumps with 194.2
BBLs 10.0# DrillPlex Mud, 1929
strokes 8 bpm @841 psi; Slow to 3
bpm 500 psi; Bump Plug; Hold 1000
psi for 5 min; check floats (Holding).
Cement in Place 17:28
6/912019
6/10/2019
6.00
SURFAC
CEMENT
WOC
P
Flush Bag and Surface Riser w/ Black
2,286.0
2,286.0
1800
00.00
Water, Flush and Clean out Flow Line,
Shaker, Mud Trough, Cuttings Pit,
clean cellar box. MU 160 psi gauge to
surface stack, refill stack and shut in
bag at 19:15. Stack Drained due to
need to change out Conductor Valve,
Riser Filled and shut back in at 20:00.
Begin Monitoring Pressure. No
Pressure seen through 23:59. Clean
DEMCO Cement Line Valves, BWM
on BOP Equipment.
6/10/2019
6/10/2019
6.00
SURFAC
CEMENT
WOC
P
Continue Wait on Cement to cure. C/O
2,286.0
2,286.0
00:00
06:00
gauge to 160 psi, initial indication 10
psi. No Pressure increase observed at
06:00.
SIMOPS: Continue to Clean Pits; Set
Wellhead in Cellar; Remove Starting
Head from BOP deck; Pull Mousehole
and Shrewhole; PM on tuggers,
Drawworks, Top Drive, Mud Pumps.
6/10/2019
6/10/2019
5.50
SURFAC
CEMENT
WOC
P
Continue Wait on Cement to cure.
2,286.0
2,286.5-
06:00
11:30
SIMOPS: Clean Mud Pits; Change
Out Valves and Seats on Pump #2;
Turn HCR Valves 180 degrees; Make
Up 12.6' High Pressure Riser to DSA
and Adapter Spool; Weld Bracing on
Cellar Landing; Continue to work on
MP2 Work orders on Draw Works, Iron
Roughneck and Pipe Shed.
6/10/2019
6/10/2019
0.50
SURFAC
CEMENT
PULD
P
PJSM; Open Annular Preventer, Drain
2,286.0
0.0
11:30
12:00
Stack. Per FMC Rep: Back Out
Landing Joint, Lay Down same.
6/10/2019
6/10/2019
0.50
SURFAC
CEMENT
RURD
P
PJSM; Rig Down Volant CRT,
0.0
0.0
12:00
12:30
Elevators and Bail Extensions.
6/10/2019
6/10/2019
2.25
SURFAC
CEMENT
NUND
P
ND Surface Bag. Pull Flow Riser,
0.0
0.0
12:30
14:45
Stand Back Surface Bag, break and
remove bolls on 17.5" Riser, Diverter
Tee and Starting head, LD same.
SIMOPS: Clean and clear Rig floor of
all running equipment.
Page 5/58 Report Printed: 8112/2019
-, Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depth
Start Time
Entl Time
Our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Dpera6on
(fIKB)
End DWM(ftKB)
6/10/2019
6/10/2019
1.00
SURFAC
WHDBOP
NUND
P
MU, RIH and set 10-3/4" Water Cap
0.0
0.0
14:45
15:45
on Surface Hanger. Test Seals to 300
psi for 5 min (witnessed and failed).
Top Seal held 100 psi, bottom seal
held no pressure. Pull and RD Water
Cap.
6/10/2019
6/10/2019
1.00
SURFAC
WHDBOP
NUND
P
Per FMC Rep: NU well Head and test
0.0
0.0
15:45
16:45
seals 07000 psi 10 min (witnessed).
6/10/2019
6/10/2019
1.25
SURFAC
WHDBOP
NUND
P
NU Adapter, DSA, 3' Spool, 12.5' HP
0.0
0.0
16:45
18:00
Riser, BOP Stack. Move Joes Box into
Drilling Position.
6/10/2019
6/102019
5.50
SURFAC
WHDBOP
RURD
P
Torque HP DSA, Riser, BOP Slack;
0.0
0.0
18:00
23:30
RU Choke and Kill hoses; Install Flow
Line. Set Test Plug. Install MPD Test
plug, Chink Joes Box, Set Mousehole
and Shrewhole. RU Test hoses. MU
Floor Dart Valve.
6/10/2019
6/11/2019
0.50
SURFAC
WHDBOP
RURD
P
Prime Mud Pumps. Fill Stack.
0.0
0.0
23:30
00:00
6/11/2019
6/11/2019
2.00
SURFAC
WHDBOP
PRTS
P
Test MPD as directed @ 300 gpm,
0.0
0.0
00:00
02:00
@150 gpm. Install Trip Nipple.
6/11/2019
6/1112019
0.50
SURFAC
WHDBOP
NUND
P
Fill Stack and Choke Manifold. Shell
0.0
0.0
02:00
02:30
lest (GOOD).
6/11/2019
6111/2019
3.50
SURFAC
WHDBOP
BOPE
P
Test BOPE, all Tests 250 psi 13500
0.0
0.0
02:30
06:00
psi, 5 min each. Super Choke and
manual tested to 1500 psi. All tests
Charted. 5" test Joint, 2-7/8" VBRs
Upper Cavity and Lower Cavity,
Choke Valves 1-15, Manual and Super
Choke, Choke and Kill Manuals and
HCRs, 4" Valve on Kill Line, 5" TIW, 5"
Dart, Upper and Lower IBOP. (ALL
PASS) Witness Waived by AOGCC
Representative Lou Laubenstein.
6/11/2019
6/11/2019
0.50
SURFAC
WHDBOP
RURD
P
Blow Down and Rig Down all test
0.0
0.0
06:00
06:30
Equipment. (PJSM held)
6/11/2019
6111/2019
0.50
SURFAC
WHDBOP
MPSP
P
Pull Test Plug and set Wear Ring per
0.0
0.0
06:30
07:00
FMC Rep.
6/11/2019
6111/2019
0.50
SURFAC
DRILLOUT
RURD
P
Stage UnderReamer on Rig Floor. Rig
0.0
0.0
07:00
07:30
Up Exceed Tongs.
SIMOPS: PJSM: PU BHA
6/11/2019
6/112019
2.75
SURFAC
DRILLOUT
BHAH
P
PU Intermediate Interval BHA per SLB
0.0
675.0
07:30
10:15
Rep to 675' MD. UW 75k; DW 83k.
6/11/2019
6/11/2019
0.75
SURFAC
DRILLOUT
TRIP
P
RIH from 675' MD to 1905' MD with 5"
675.0
1,905.0
10:15
11:00
DP stands out of Derrick. Pick Up
joints of 5"DP from Pipe Shed from
1905' MD to 1990' MD. UW 105k, DW
103k.
6/112019
6/1112019
0.50
SURFAC
DRILLOUT
CIRC
P
Shallow Hole Test MWD @675 gpm,
1,990.0
1,990.0
11:00
11:30
1446 psi while circulating Bottoms Up.
6/11/2019
6/1112019
0.50
SURFAC
DRILLOUT
RURD
P
Blow Down Top Drive, Rig Up to test
1,990.0
1,990.0
11:30
12:00
10.75" Casing to 3500 psi for 30 min
(Charted)
6/11/2019
6/112019
0.50
SURFAC
DRILLOUT
PRTS
P
Pressure test 10-3/4" Surface Casing
1,990.0
1,990.0
12:00
12:30
to 3500 psi for 30 min. (Charted,
PASS)
6/11/2019
6/11/2019
0.25
SURFAC
DRILLOUT
RURD
P
Blow Down and Rig Down Test
1,990.0
1,990.0
12:30
12:45
Equipment.
6111/2019
6/11/2019
1.25
SURFAC
DRILLOUT
COCF
P
RIH from 1990' MD to 2080' MD with
1,990.0
2,080.0
12:45
14:00
pipe form Pipe Shed, Wash Down at
84 gpm to Cement Stringer at 2146'
MD. Wash and Ream down to Cement
Plug @ 2183' MD, 136 gpm, 120 psi,
30 rpm, 3-4k TQ.
Page 6158
Report Printed: SI12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
rt
sfad Depth
start Time
End Time
Our (hr)
Phase
O Coda
Op
viy
Activity Code
Time P-T- X
Operetlon
KB)
End Depth (fiKB)
6/1112019
6/11/2019
5.00
SURFAC
DRILLOUT
DRLG
P
Drill Cement Plugs, Float Collar, Shoe
2,080.0
2,318.0
14:00
19:00
Track, Float Shoe and Rat Hole to
2318' MD, 400-668 gpm, 710-1420
psi, 30-80 rpm, 4-1 Ok TO, 31 % FO, 3-
25k WOB.
SIMOPS: Displace well to 9.6 LSND
once past Float Shoe.
6/11/2019
6/11/2019
0.50
SURFAC
DRILLOUT
RURD
P
Rig Up equipment for FIT Test,
2,318.0
2,274.0
19:00
19:30
continue to circulate for even 9.5 ppg
-SND mud in/out.
6/11/2019
6/11/2019
1.00
SURFAC
DRILLOUT
FIT
P
FIT test, 27 strokes to 1040 psi, Shut-
2,274.0
2,274.0
19:30
2030
In pressure form 1040 to 900 psi in 10
min. (Charted, 18.7 ppg FIT) 2.7 bbls
pumped, 2.5 bola returned.
6/11/2019
6/11/2019
1.50
INTRMI
DRILL
DDRL
P
Drill 9-7/8" Intermediate hole from
2,274.0
2,420.0
20:30
22:00
2318' MD to 2420' MD, 2250' TVD,
700 gpm, 1350 psi, 36% FO, 80 rpm,
5k To, 10k WOB, ECD 10.35 ppg, PU
106k, SO 104k, 2-3k TO.
SPRs @ 21:40: @2368' MD, 2230'
TVD, MW = 9.6 ppg LSND
Pump #1: 30 spm = 130 psi; 40 spm =
160 psi
Pump #2: 30 spm = 130 psi; 40 spm =
160 psi
6/11/2019
6/12/2019
2.00
INTRMI
DRILL
OTHR
P
Drop 1.25" OD Ball to activate/unlock
2,420.0
2,420.0
22:00
00:00
Rhino UnderReamer. Rotate and
Reciprocate 5' while pumping @ 12
spm per SLB Rep. 63 psi, 30 rpm, 2-
3k TO. Note 100 psi increase at 150
strokes, continue to pump to 420
strokes. Stage pumps up to 50 spm Q
1355 psi then observe pressure fall to
55 psi. UnderReamer
activated/unlocked. Stage pumps to
800 gpm, Original Pressure to 1400
psi- Reamer Open at 1150 psi. PU to
2388' MD, confirm open. PU 114k,
TRPM before open 3860 rpm, after
open 3720 rpm.
6/12/2019
6/12/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 2420'
2,420.0
3,029.0
00:00
06:00
MD to 3029' MD, 2686' TVD. 820 gpm,
1357 psi, 36% FO, 150 rpm, 5-6k To,
7k WOB, ECD 10.47 ppg, PU 117k,
SO 11 Ok, Rot 113k, 3k TO, ADT -
3.86, Total Bit hours = 5.4, Total Jars =
146.77.
6/12/2019
6/12/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 3029'
3,029.0
3,887.0
06:00
12:00
MD to 3887' MD, 3082' TVD. 820 gpm,
1830 psi, 36% FO, 150 rpm, 9-1 ok
TO, 10-17k WOB, ECD 11.33 ppg, PU
127k, SO 109k, Rot 112k, 5k TO, ADT
= 3.89, Total Bit hours = 9.92, Total
Jars = 150.66.
6/12/2019
6/1212019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 3887'
3,887.0
4,911.0
12:00
18:00
MD to 4911' MO, 3330' TVD. 850 gpm,
2110 psi, 38% FO, 180 rpm, 10-11 k
To, 15-23k WOB, ECD 11.91 ppg, PU
128k, SO 105k, Rot 109k, 3-5k TO,
ADT = 4.13, Total Bit hours = 13.42,
Total Jars = 154.79.
Page 7158 ReportPrinted: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
Stan Depth
(ftKB)
End Depm(ftKB)
6/12/2019
6/13/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 4911'
4,911.0
5,863.0
18:00
0000
MD to 5863' MD, 3534' TVD. 850 gpm,
2660 psi, 38% FO, 180 rpm, 7-8k TO,
15k WOB, ECD 12.04 ppg, PU 139k,
SO 111k, Rot 117k, 4k TQ, ADT =
3.95, Total Bit hours = 17.37, Total
Jars = 158.74.
6/13/2019
6/13/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 5863'
5,863.0
6,632.0
00:00
0600
MD to 6632' MD, 3698' TVD. 850 gpm,
2683 psi, 37% FO, 180 rpm, 10k TO,
16k WOB, ECD 11.8 ppg, PU 133k,
SO 113k, Rot 122k, 5k TO, ADT =
4.19, Total Bit hours = 21.56, Total
Jars = 162.93. Pumped sweeps as
needed.
6/13/2019
6/13/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 6632'
6,632.0
7,569.0
06:00
12:00
MD to 7569' MD, 3895' TVD. 850 gpm,
2862 psi, 37% FO, 180 rpm, 12k TO,
9-12k WOB, ECD 11.46 ppg, PU
145k, SO 110k, Rot 124k, 7k TO, ADT
= 4.34, Total Bit hours = 25.9, Total
Jars = 167.27. Pumped sweeps as
needed.
6/13/2019
6/13/2019
2.75
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 7569'
7,569.0
7,970.0
12:00
14:45
MD to 7970' MD, 3979' TVD. 850 gpm,
2910 psi, 37% FO, 180 rpm, 11-12k
TO, 8-27k WOB, ECD 11.56 ppg, PU
145k, Rot 124k, 7k TO, ADT = 1.99,
Total Bit hours = 27.89, Total Jars =
169.29.
6/13/2019
6/13/2019
0.50
INTRMI
DRILL
OTHR
T
Lost High Line Power (to all of Alpine
7,970.0
7,970.0
14:45
15:15
field), Swap to Rig Generator Power.
6/13/2019
6/13/2019
2.75
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 7970'
7,970.0
8,301.0
15:15
18:00
MD to 8301' MD, 4047' TVD. 853 gpm,
2290 psi, 37% FO, 180 rpm, 13k TO,
13-22k WOB, ECD 11.66 ppg, PU
151 k, SO 116k, Rot 130k, 8k TO, ADT
= 1.91, Total Bit hours = 29.80, Total
Jars = 171.17.
6/13/2019
6/14/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 8301'
8,301.0
8,962.0
18:00
00:00
MD to 8962' MD, 4145' TVD. 855 gpm,
2665 psi, 37% FO, 180 rpm, 12-13k
TO, 25k WOB, ECD 11.45 ppg, PU
148k, SO 118k, Rot 133k, 7k TO, ADT
= 4.03, Total Bit hours = 33.83 Total
Jars = 175.2.
6/14/2019
6/14/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 8962'
8,962.0
9,807.0
00:00
0600
MD to 9807' MD, 4288' TVD. 850 gpm,
2895 psi, 37% FO, 180 rpm, 12k TO,
11k WOB, ECD 11.21 ppg, PU 161 k,
SO 118k, Rot 140k, 7-8k TO, ADT =
4.28, Total Bit hours = 38.11, Total
Jars = 179.48.
6/14/2019
6/14/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 9807'
9,807.0
10,511.0
06:00
1200
MD to 10511' MD, 4633' TVD. 850
gpm, 2860 psi, 37% FO, 150 rpm, 14k
TO, 10k WOB, ECD 11.00 ppg, PU
170k, SO 125k, Rot 147k, 8k TO, ADT
= 4.16, Total Bit hours = 42.27, Total
Jars = 183.64.
Page 8158 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depm
Start Time
End TIM
our (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operabon
(ftKB)
End Depth (nKB)
6/14/2019
6/14/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 10511'
10,511.0
11,312.0
1200
18:00
MD to 11312' MD, 5261' TVD. 850
gpm, 2800 psi, 37% FO, 170 rpm, 161k
To, 15k WOB, ECD 11.35 ppg, PU
208k, SO 127k, Rot 151 k, 13k To,
ADT = 3.92, Total Bit hours = 46.19,
Total Jars = 187.56.
6/14/2019
6/15/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 11312'
11,312.0
12,067.0
1800
00:00
MD to 12067' MD, 6000' TVD. 850
gpm, 3262 psi, 37% FO, 170 rpm, 20k
TO, 16k WOB, ECD 11.3 ppg, PU
255k, SO 157k, Rol 189k, 15k TO,
ADT = 3.61, Total Bit hours = 49.8,
Total Jars = 191.17.
6/15/2019
6/15/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 12067'
12,067.0
12,629.0
00:00
06:00
MD to 12629' MD, 6542' TVD. 850
gpm, 3235 psi, 36% FO, 140 rpm, 21 k
TO, 6.5k WOB, ECD 11.24 ppg, PU
355k (with no break over) or PU, SO
or Rot weights, ADT = 4.32, Total Bit
hours = 54.12, Total Jars = 195.49.
6/15/2019
6/15/2019
1.50
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 12629'
12,629.0
12,723.0
06:00
07:30
MD to 12723' MD, 6628' TVD. 850
gpm, 3526 psi, 36% FO, 140 rpm, 13k
TO, 6.5k WOB, ECD 11.23 ppg, PU
285k, SO 158k, Rol 1921k, 13k TO,
6/15/2019
6/15/2019
1.25
INTRMI
DRILL
CIRC
P
Circulate BU while rotating and
12,723.0
12,723.0
07:30
08:45
reciprocating from 12723' MD to
12635' MD, 850 gpm, 3526 psi, 36%
FO, 140 rpm, 12k TO Off Bottom, PU
285k, SO 159k, Rot 192k, Rot TO 13k,
1,464 bbls pumped.
6/15/2019
6/15/2019
0.25
INTRMI
DRILL
OWFF
P
Observe the well for flow.
12,723.0
12,723.0
0845
09:00
6/15/2019
6/15/2019
0.50
INTRMI
DRILL
RURD
P
Pull Trip Nipple, Install RCD bearing
12,723.0
12,723.0
09:00
09:30
1
1
1 as per MPD Rep.
6/15/2019
6/15/2019
2.50
INTRMI
DRILL
DDRL
P
Drill 9.875" Intermediate from 12723'
12,723.0
12,991.0
0930
12:00
MD to 12991' MD, 6850' TVD. 850
gpm, 3619 psi, 150 rpm, 24k TO, 301k
WOB, ECD 11.62 ppg, PU 285k, SO
157k, Rot 192k, 19k TO, ADT = 2.26,
Total Bit hours = 56.38, Total Jars =
197.75.
6/15/2019
6/15/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875"" Intermediate from 12991'
12,991.0
13,573.0
12:00
18:00
MD to 13573' MD, 7232' TVD. 845
gpm, 3704 psi, 110 rpm, 25k To, 24k
WOB, ECD 11.78 ppg, PU 325k, SO
1451k, Rot 190k, 17k TO, ADT = 3.86,
Total Bit hours = 60.24, Total Jars =
201.61.
6/15/2019
6/16/2019
6.00
INTRMI
DRILL
DDRL
P
Drill 9.875"" Intermediate from 13573'
13.573.0
14,045.0
18:00
00:00
MD to 14045' MD, 7412' TVD. 850
gpm, 3610 psi, 100 rpm, 22k TO, 18k
WOB, ECD 11.52 ppg, PU 330k, SO
145k, Rot 187k, 18k TO, ADT = 4.63,
Total Bit hours = 64.87, Total Jars =
206.24.
6/16/2019
6/16/2019
3.50
INTRMI
DRILL
DDRL
P
Drill 9.875"" Intermediate from 14045'
14,045.0
14,370.0
00:00
03:30
MD to TD at 14370' MD, 7486' TVD.
850 gpm, 3630 psi, 100 rpm, 25k TO,
241k WOB, ECD 11.47 ppg, PU 315k,
SO 143k, Rot 185k, 78k TO, ADT =
3.29, Total Bit hours = 68.16, Total
Jars = 209.53.
Page 9158 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Depth
Stan Tane
End Time
Dur (hr)
Phase
Op Code
Aa fty Cafe
Time P -T -k
Operation
(MB)
End Depth (WB)
6/16/2019
6/16/2019
4.75
INTRMI
CASING
CIRC
P
Pump Final Survey, LayDown Single,
14,370.0
14,304.0
03:30
08:15
Rotate and Reciprocate pipe from
14369' MD to 14304' MD, 3700 psi,
150 rpm, 18-20k TQ, ECD 11.4 ppg,
Rot 184k, 17k TQ off. Rack back every
3rd BU. 39822 total strokes pumped.
6/16/2019
6/16/2019
2.25
INTRMI
CASING
CIRC
P
Continue to Rotate and Reciprocate
14,304.0
14,230.0
08:15
10:30
while weighting up system to 10.8 ppg
from 14304' MD to 14230' MD, 3700
psi, 150 rpm, 18-20k TO, ECD 11.4,
Rot 194k, 17k TQ, Rack back every
3rd BU. 39822 total strokes pumped..
Obtain baseline parameters: 50 rpm,
18k TQ, 3470 psi, 800 gpm, 38601
2695 TRPM.
6/16/2019
6/16/2019
0.50
INTRMI
CASING
OWFF
P
Observe Well for Flow (STATIC).
14,230.0
14,230.0
10:30
11:00
6/16/2019
6/16/2019
1.00
INTRMI
CASING
OTHR
P
Drop Ball and pump down per SLB DD
14,230.0
14,230.0
11:00
12:00
Rep. 250 gpm, 650 psi, 1587 strokes,
140 gpm, 392 psi, 426 strokes, no
indication Rhino UnderReamer closed,
stage up to 800 gpm to confirm status
of UnderReamer. No confirmation
after comparing baseline parameters.
Total 7159 strokes pumped.
6/16/2019
6/16/2019
6.00
INTRMI
CASING
BKRM
P
BROOH while Laying Down Drill Pipe
14,230.0
13,317.0
12:00
18:00
in the mousehole from 14230' MD to
13317' MD maintaining 11.3 EMW on
connections with MPD. 675-610 gpm,
2625-2223 psi, 29-26 FO%, 100-150
rpm, 17k TQ,Rot 198k.
6/16/2019
6/17/2019
6.00
INTRMI
CASING
BKRM
P
BROOH while Laying Down Drill Pipe
13,317.0
12,030.0
18:00
00:00
in the mousehole from 13317' MD to
12030' MD maintaining 11.3 EMW on
connections with MPD. 675 gpm, 2500
psi, 31 FO%, 100 rpm, 17k TQ,Rot
169k.. Pumped Hi -Vis sweep at
12120' MD.
6/17/2019
6/17/2019
6.00
INTRMI
CASING
BKRM
P
BROOH while Laying Down Drill Pipe
12,030.0
10,633.0
00:00
0600
in the mousehole from 12030' MD to
10633' MD maintaining 11.3 EMW on
connections with MPD. 675 gpm, 2325
psi, 27 FO%, 100 rpm, 12-13k TQ, Rot
145k with pumps on.
6/17/2019
6/17/2019
6.00
INTRMI
CASING
BKRM
P
BROOH while Laying Down Drill Pipe
10,633.0
9,058.0
06:00
12:00
in the mousehole from 10633' MD to
9058' MD maintaining 11.3 EMW on
connections with MPD. 600-675 gpm,
1775 psi, 30 FO%, 100-125 rpm, 12k
TQ, Rol 110k with pumps on.
6/17/2019
6/17/2019
4.00
INTRMI
CASING
BKRM
P
BROOH while Laying Down Drill Pipe
9,058.0
7,925.0
12:00
16:00
In the mousehole from 9058' MD to
7925' MD maintaining 11.3 EMW on
connections with MPD. 700 gpm, 1774
psi, 30 FO%, 100-125 rpm, 12k TO,
Rol 128k with pumps on.
6/17/2019
6/17/2019
1.50
INTRMI
CASING
CIRC
P
Condition mud and circulate while
7,925.0
7,925.0
16:00
17:30
Rotating and Reciprocating from 7925'
MD to 7831' MD. 800 gpm, 2290 psi,
FO 30%,150 rpm, 12K TO (off), Rot
128k.
6/17/2019
6/17/2019
0.75
INTRMI
CASING
OWFF
P
Observe Well for Flow (STATIC).
7,925.0
7,625.0
17:30
18:15
1
6/17/2019
6/17/2019
0.75
INRMI
CASING
KURD
P
Pull MPD bearing and install Trip
7,925.0
7,925.0
18:15
19:00 1
1
Nipple. Take SPR's
Page 10158 ReportPrinted: 811212019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Stan Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P-T-x
Operation
(flKB)
End Depth n1KB)
6/17/2019
6/18/2019
5.00
INTRMI
CASING
BKRM
P
BROOH while Laying Down Drill Pipe
7,925.0
6,500.0
1900
0000
in the mousehole from 7925' MD to
6500' MD. 700 gpm, 1950 psi, 29
FO°%, 100 rpm, 7-9k TQ, Rot 120k
with pumps on.
6/18/2019
6/18/2019
6.00
INTRMI
CASING
BKRM
P
BROOH while laying down DP from
6,500.0
5,600.0
0000
0600
6,500'to 5,600' MD at 700 GPM. Ran
Pumps between 1,950-2,100 psi with
29% flow out at 100rpm. Observed
torque between 7 and 9k ft/lbs. with a
rotating weight of a 108k with pumps
on. Pumped a 12.8/ppg Hi-Visc
weighted sweep at 5.750' MD.
6/18/2019
6/18/2019
6.00
INTRMI
CASING
BKRM
P
Continued to BROOH while laying
5,600.0
5,230.0
06:00
12:00
down DP from 5,600'to 5,230' MD at
850 GPM. Ran pumps at — 2,700 psi
with 32% flow out at 100-rpms.
Observed torque between 7 and 9k
fUlbs. with a rotating weight of 11 Ok
with pumps on. Pumped a second 50
bbl. 12.8 ppg Hi-Visc weighted sweep
at 5,350' MD. Total fluid loss for the
past 12hrs — 5 bbls
6/18/2019
6/18/2019
3.00
INTRMI
CASING
BKRM
P
Continued to BROOH while laying
5,230.0
5,093.0
1200
1500
down DP from 5,230' to 5,093' MD at
850 GPM. Ran pumps at 2,730 psi
with 32% flow out at 100-rpms. Cont.
to observe torque between 7-9k fl/lbs.
with a rotating weight of 110k with
pumps on. Pumped a 50 bbl. 12.8 ppg
Hi-Visc sweep at 5,350'— 5,093' MD
and experienced a 73-bbl. loss and a
high ECD of 13.89.
6/18/2019
6/18/2019
2.50
INTRMI
CASING
BKRM
P
Back reamed out of hole and
5,093.0
5,001.0
15:00
17:30
continued to work pipe from 5,093' to
5,001' MD at 650 GPM. Ran pumps at
1,765 psi with 28% flow out at 100-
rpms. Observed torque at 7k fl/lbs,
and staged up pump rate to 850 gpm
and increased pipe rotation.
Continued to pump the 50 bbl. of 12.8
ppg HiVisesweep.
6/18/2019
6/19/2019
6.50
INTRMI
CASING
BKRM
P
Continued to BROOH while laying
5,001.0
4,045.0
17:30
00:00
down DP from 5,001' to 4,045' MD at
850 GPM. Ran pumps at 2,250 psi
with 30% How out at 125-rpms.
Continue to observe torque between 7
-9k ft/lbs. with a rotating weight of
105k with pumps on. Pumped a 50
bbl. 12.8 ppg Hi-Visc sweep at 4,250'
MD.Total Losses for the last 24hrs - 78
bbls.
6/19/2019
6/19/2019
6.00
INTRMI
CASING
BKRM
P
Continued to BROOH while laying
4,045.0
3,265.0
00:00
06:00
down DP from 4,045' to 3,265' MD at
850 GPM. Ran pumps at 2,360 psi
with 30-80% flow out at 125-rpms.
Continue to observe torque between 3
-4k ft/lbs. with a rotating weight of 98k
with pumps on. Pumped a 28 bbl. 12.8
ppg Hi-Visc sweep at 3,475' MD.
Page 11158 ReportPrinted: 8/12/2019
Uperations Summary (with Timelog Depths)
C D5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depth(ftKB)
6/19/2019
6/19/2019
6.00
INTRMI
CASING
BHAH
P
Continued to BROOH while laying
3,265.0
2,950.0
0600
12:00
down DP from 3,265'to 2,950' MD at
675 GPM. Ran pumps at 1,380 psi
with 30% flow out at 125-rpms.
Continue to observe torque between
4k ft/lbs. with a rotating weight of 98k,
pumps on. Pumped a 60 bbl. 12.8 ppg
Hi-Visc sweep at 3,080' MD.
6/19/2019
6/19/2019
5.00
INTRMI
CASING
BHAH
P
Continued to BROOH while laying
2,950.0
2,461.0
1200
1700
down DP from 2,950 to 2,461' MD at
675 GPM. Ran pumps at 1,415 psi
with 30% flow out at 125-rpms.
Observed torque while rotating at 4k
ft/lbs. with a rotating weight of 98k with
pumps on.
6/19/2019
6/19/2019
1.00
INTRMI
CASING
PMPO
P
Pump out pf hole from 2,461'to 2,370'
2,461.0
2,370.0
17:00
18:00
MD with 750 GPM while laying DP
down. Ran pumps at 1,662 psi with a
flow out of 31%. Pick up weight; 105k,
Slack off weight 102k.
6/19/2019
6/19/2019
1.00
INTRMI
CASING
PMPO
P
Continued to pump out of hole from
2,370.0
2,190.0
18:00
19:00
2,370'to 2,190' MD with 795 GPM.
Increased Pumps to 1,810 psi with a
flow out of 43%. Pulled BHA through
shoe without issue. Pick up weight
105k, slack off weight 102k.
6/19/2019
6/19/2019
2.50
INTRMI
CASING
PMPO
P
Rotated and reciprocated from 2,270'
2,190.0
2,180.0
1900
21:30
to 2,180' MD with 800 GPM at 30
rpms and 1,810 psi. observed 40-60%
flow out, torque remained 1-2k ft/lbs.
Pumped 4ea Hi -Weight Nut -plug
sweeps, total strokes 28, 726. Mud
returned clean. Pick up weight was
105k and Slack off, 107k.
6/19/2019
6/20/2019
2.50
INTRMI
CASING
PMPO
P
Observed well for flow; well static.
2,180.0
1,050.0
21:30
0000
POOH to 2,180'to 1,050' MD at 300
GPM/71 SPM and observed 14% flow
out with 250-320 psi.Total losses 67
bbls.
6/20/2019
6/20/2019
1.00
INTRMI
CASING
PMPO
P
Continue to POOH from 1,050'to 675'
1,050.0
675.0
0000
01:00
MD at 300 GPM, 260 psi with 12%
now out.
6/20/2019
6/20/2019
1.00
INTRMI
CASING
OWFF
P
OWFF for 10 min. Well Static.
675.0
441.0
01:00
0200
continued to lay down 5 joints of
HWDP, jars, and observed 19k
overpull at 479' MD with a 22k overpull
at 441' MD. Drained stack observed
clay build up on trip nipple and in
stack, suspected additional clay build
on DP collar wear -bushing. Notified
FMC.
6/20/2019
6/20/2019
0.50
INTRMI
CASING
SVRG
P
Serviced top drive and blocks.
441.0
441.0
02:00
02:30
6/20/2019
6/20/2019
2.50
INTRMI
CASING
CIRC
P
Filled stack and took returns across
441.0
210.0
02:30
05:00
shakers, increased pump rate from
250 - 600 -800 GPM while rotating
pipe at 50 rpms with 5k ft/lbs. Pulled
62k on pipe, no overpull. Continue to
lay down BHA as per SLB.
6/20/2019
6/20/2019
2.75
INTRMI
CASING
PMPO
P
Continued to lay down BHA from 210'
210.0
0.0
0500
0745
to surface, pick up weight 54k slack off
weight 44k. No further rotation or
circulation was required.
Page 12158 ReportPrinted: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depth
start Time
EM Time
Dur (hr)
Phase
Op CMO
Activity Code
Time P -T -X
Operation
(MB)
End Depth (ftKB)
6/20/2019
6/2012019
2.25
INTRMI
CASING
CLEN
P
Clean and cleared rig Floor, flushed
0.0
0.0
07:45
10:00
and prepped BOP's for ram change.
Drained Stack and pulled wear
bushing.
6/20/2019
6/20/2019
1.25
INTRM1
CASING
SVRG
P
Held Pre -job safety meeting for ram
0.0
0.0
10:00
11:15
change and drill line slip and cut
SIMOPS. Changed upper pipe rams to
7-5/8" fixed and completed drill line
Islip and cut.
6/2012019
6/20/2019
0.75
INTRMI
CASING
BOPE
P
Rig up and test annular and 7-5/8"
0.0
0.0
11:15
12:00
upper pipe rams. 250 psi for low and
2500 psi for Annular, 250 psi for low
and 3500 psi f/high for pipe rams.
Tests good. All tests were charted as
required.
6/2012019
6/20/2019
1.00
INTRM1
CASING
BOPE
P
Rig down BOP test equipment and
0.0
0.0
12:00
13:00
cleared floor.
6/20/2019
6/20/2019
1.50
INTRMI
CASING
RURD
P
Rigged up casing equipment for
0.0
0.0
13:00
14:30
1
1
running 7-5/8" intermediate.
6120/2019
6/20/2019
3.50
INTRMI
CASING
PUTB
P
Performed pre -job safety meeting for
0.0
715.0
14:30
18:00
running 7-518" casing as per
engineering planned detail. Ran csg
from surface to 715' MD filling pipe
staying 1jt behind top off every 10.
Pick up weight 57k, Slack off -46k.
6/20/2019
6/21/2019
6.00
INTRMI
CASING
PUTB
P
Continue to run 7-5/8" intermediate
715.0
2,131.0
1800
00:00
csg string from 715.0'to 2,131' MD
per the engineering detail. Continue to
fill every 10 joints, Pick up weight
110K, Slack off weight 112k. Total
losses in hole last 24hrs. - 9 bbls.
6/21/2019
612112019
6.00
INTRMI
CASING
PUTB
P
Made csg weight transition from 39#
2,131.0
3,850.0
00:00
06:00
to 29.7# 7-5/8" as per csg detail.
Continue to run intermediate from
2,131' to 3,850' MD while filling every
joint topping off every 10. Continued to
monitor fluid displacement in pit 2,
Pick up weight - 139k, Slack off
weight -125k.
6/21/2019
6/21/2019
6.00
INTRMI
CASING
PUTB
P
Continue to run intermediate as per
3,850.0
5,995.0
06:00
12:00
detail from 3,850'to 5,995' MD filling
every joint while monitoring fluid
displacement in pit 2. Pick up weight -
155k, Slack off weight -116k.
6/21/2019
6/21/2019
6.00
INTRMI
CASING
PUTS
P
Continue to run 29.7# intermediate
5,995.0
8,114.0
12:00
16:00
csg as per engineering detail from
5,995'to 8,114' MD. Circulated
bottoms up from 8,114' MD staging up
in Y. bbl. increments until reaching
scheduled target of 7 bbls..5 BPM -
134 psi; 1.0 BPM -200 psi; 1.5 BPM -
220 psi; 2.0 BPM -240 psi; 2.5 BPM -
255 psi; 3.0 BPM -270 psi; 3.5 BPM -
295 psi; 4.0 BPM -295 psi; 4.5 BPM -
295 psi; 5.0 BPM -313 psi; 5.5 BPM -
335 psi; 6.0 BPM -350 psi; 6.5 BPM -
365 psi; 7.0 BPM -395 psi. Pick up
weight - 172k, Slack off weight -128k.
6/21/2019
6/22/2019
6.00
INTRMI
CASING
PUTS
P
Continue to run intermediate csg as
8,114.0
9,115.0
18:00
00:00
per detail from 8,114' to 9,115' MD
filling every 10 joints while monitoring
fluid displacement in pit 2. Pick up
weight 178k, Slack off weight 117K.
Total fluid losses for tower- 0.0 bbls.
Page 13168 ReportPrinted: 811212019
la Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Stan lune
End Time
Dur (hr)
Phase
Op Cade
Acth tty Code
Time P -T-%
Operalmn
(ftKB)
End Depth (fWB)
6/22/2019
6/22/2019
6.00
INTRMI
CASING
PUTS
P
Continue to run 7-518" intermediate
9,115.0
11,280.0
00:00
06:00
csg as per engineering detail from
9,115' to 11,280' MD while filling every
10 joints. Continue to monitor fluid
displacement in pit 2. Pick up weight —
260k, Slack off weight 140k.
6/22/2019
6/22/2019
6.00
INTRMI
CASING
PUTB
P
Continue to run 7-5/8" intermediate
11,280.0
13,059.0
06:00
12:00
csg as per engineering detail from
11,280" to 13,059' MD while filling
every 10 joints. Continue to monitor
Fluid displacement in pit 2. Pick up
weight— 127k, Slack off weight 95k.
6/22/2019
6/22/2019
1.25
INTRMI
CASING
PUTB
P
Continue to run 7-5/8" intermediate
13,059.0
13,326.0
12:00
13:15
csg as per engineering detail from
13,059" to 13,326' MD while filling
every 10 joints. Continue to monitor
fluid displacement in pit 2, Pick up
weight — 0.0, Slack off weight —170k.
6/22/2019
6/22/2019
1.25
INTRMI
CASING
PUTB
P
Circulated and reciprocated csg from
13,326.0
13,363.0
13:15
14:30
13,326'to 13,363' MD with % bpm at
380 psi, step up to 1.0 bpm at 396 psi,
final at 1.5 bpm with 420 psi. Pick up
weight - 350k, Slack off weight — 170k,
Breakover noted at 420k. Total strokes
pumped — 556. Continued to monitor
fluid displacement in pit 2.
6/22/2019
6/22/2019
3.50
INTRMI
CASING
PUTB
P
Continued to run 7-5/8" intermediate
13,381.0
13.921.0
14:30
18:00
csg as per engineering detail from
13,381'to 13, 921' MD while filling
every 10 joints and monitoring fluid
displacement in pit 2. Pick up weight -
350k, Slack off weight 166k.
Experienced running difficulty at 13,
880' MD, worked pipe through tight
areas with 14k ft/lbs. at % bpm and
306 psi. Attempted to break over at
490k without success, came down and
continue to run csg dropping ROP to
25ft. per/min.
6/22/2019
6/23/2019
6.00
INTRMI
CASING
PUTB
P
Continued to run 7-5/8" intermediate
13,921.0
14,250.0
18:00
0000
csg as per engineering detail from
13,921'to 14,250 MD filling every 10
joints while monitoring Fluid
displacement in pit # 2. Slack off
weight; 100k with an average ROP of
50 ft/hr.
6/23/2019
6/23/2019
1.50
INTRMI
CASING
PUTS
P
Continued to run 7-5/8" intermediate
14,250.0
14,321.0
00:00
01:30
csg as per engineering detail from
14,250'to 14,321' MD while filling
every 10 joints. Monitored fluid
displacement on pit 2, Slack off weight
100k with an average ROP of 50 ft/hr.
6/23/2019
6/23/2019
0.50
INTRMI
CASING
PUTB
P
Made up FMC 7-518" fluted hgr and
14,321.0
14,361.0
01:30
02:00
landing joint and torqued the Hyddl
563 connection to 10,300 f/lbs. Made
up cement hose on Volant cement
swivel sub assembly, landed hgr in
wellhead at 14,361' MD. Picked -up to
14,356' and began to stage up pumps
at % bbl increments to 7 bpm.
Page 14/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
`qW
Rig:
DOYON 25 Job:
DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
our (m)
Phaw
Op Code
Ac fiy Cole
Time P-T-X
Operation
(N(a)
End Depm (ftKB)
6/23/2019
6/23/2019
4.00
INTRMI
CEMENT
CIRC
P
Continued and slowly staged up
14,356.0
14,338.0
02:00
06:00
pumps at''/: bpm to 7 bpm while
reciprocating pipe. Experienced tight
hole and over pulled while working
pipe. Freed pipe at 450k. Continue to
work pipe to landing ring and
encountered circulation pack-off. Shut
pumps down and worked pipe free.
Staged pumps up to 4 bpm again at %
bbl increments. Lost circulation and
shut pumps down. Slowly brought
pumps back on line to 2 bpm with
approx. 1 bbl returns. Initial pump
rates; % bbl - 300psi; 1.0 bbl - 400psi;
1.5 bbls - 475psi; 2.0 bbls — 550psi;
2.5 bbls - 675psi; 3.0 bbls — 680psi;
3.5bbls — 690psi; 4.0 bbls — 720psi;
4.5 bbls-725psi; 5.0 bbls-750psi;
5.5 bbls — 775psi; 6.0 bbls — 835psi;
6.5 bbls — 835psi; 7.0 bbls — 850psi.
6/23/2019
6/23/2019
6.00
INTRM1
CEMENT
CIRC
P
Continue to circulate and condition
14,360.0
14,338.0
06:00
12:00
mud while reciprocating from 14,360'
to 14,338' MD with 2.0 bpm at 346 psi.
Flow out was observed between 2-
10%, Pick up weight was observed at
350k, Slack off weight 160k. Continue
to stage pumps up at % bpm to 4.5
bpm. Continue to circulate out heavy
mud, 11.3 ppg with the return rate
continually displaying improvement.
Total strokes pumped— 16,725.
6/23/2019
6/23/2019
2.00
INTRM1
CEMENT
CIRC
P
Continue to circulate and condition
14,338.0
14,360.0
1200
1400
mud while reciprocating from 14,338'
to 14,360' MD with 4.5 bpm at 452 psi.
Observed Sow out at 12% with a pick-
up weight of 350k and a slack off
weight of 160k. No losses at this time
recorded. Strokes pumped 3,443,
totaling 20,168. Conducted a pre-job
safety meeting for cementing with all
involved parties. SIMOPS change cup
prior to Cement work.
Page 15158 Report Printed: 8/12/2019
-, Uperations Summary (with Timelog Depths)
C D5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start DepN
StaM1 Time
End Time
Dur (hr)
Phase
Op Code
Activit' Code
Time P -T -X
Operation
(fiKa)
End Depth (fixe)
6/23/2019
6/23/2019
4.50
INTRMI
CEMENT
CMNT
P
Pumped cement as per
14,360.0
14,361.0
14:00
18:30
CPAI/Schlumberger cement detail
while reciprocating from 14, 360' to
14,338' MD. SLB pump 60 bbls of 11.5
ppg of Mud push and dropped lop
plug, followed by pumping 99.1 bbls of
15.8 cement. Dropped bottom plug
and pumped 20.2 bbls of H2O and
SBL swapped over to rig pumps at 4.5
bpm and 452 psi. Flow out was
observed at 12%, Pick-up weight -
350k, Slack -off weight 160k. Observed
cement outrunning pumps based on
steep hole inclination and noted the
bottom plug landed early. With 16 bbls
of cement out of shoe, observed pack -
off and noting losses, attempt to pick
up and move pipe at 90k over with no
movement. Set hgr down in its
appropriate profile without issue.
Varied pump rate to obtain best
returns, (1-3) bpm, top plug landed
early at 6,136 strokes, pressure was
observed at 1,600 psi. CIP at 1805
hrs. Total cement pumped 99 bbls,
total losses, 29 bbls.
6/23/2019
6/23/2019
1.00
INTRMI
CEMENT
CMNT
P
Maintained 1600 psi for 5 -min, bled off
0.0
0.0
18:30
19:30
and shut in verifying floats. No
pressure observed. Broke cement
hose loose and observed for flow.
Floats held.
6/23/2019
6/23/2019
2.50
INTRMI
CEMENT
WWSP
P
Rigged down remaining rasing
0.0
0.0
19:30
22:00
equipment, blew down cement hose
and surface lines. Laid down 7-5/8"
landing joint and volant tool. Pumped
out BOP Stack, picked up 4" Test joint
and R/R tool, installed 7-5/8" mandrel
mg hgr pack -off, Tested Pack -off at
250 psi low and 5000psi high for 10 -
min each, test good, witnessed by
COP Rep.
6/23/2019
6/24/2019
2.00
INTRMI
WHDBOP
WOC
P
SIMOPS Closed blind rams, bleed
0.0
0.0
22:00
00:00
down Koomey unit, changed out upper
rams from 7-5/8" fixed to 2-7/8" x 5-
1/2" VBRS. Total losses reported - (43
bbls) - 29 bbls of cemenU14 bbls of
10.8 ppg mud.
6/2412019
6/24/2019
2.00
INTRMI
WHDBOP
CMNT
P
Changed out NC -50 Saver Sub and
0.0
0.0
00:00
02:00
install 4.0" XT39 sub in conjunction
with changing the top drive die blocks.
6/24/2019
6/24/2019
1.00
INTRMI
WHDBOP
BOPE
P
Installed FMC test Plug, rigged up to
0.0
0.0
02:00
03:00
test BOP's, flooded stack and lines,
bled air from system, and installed test
sub on top drive.
6/24/2019
6/24/2019
3.25
INTRMI
WHDBOP
BOPE
P
Test BOPE, all Tests 250 psi / 3500
0.0
0.0
03:00
06:15
psi, 5 min each. Super Choke and
manual tested to 1000 psi. All tests
Charted. 4" test Joint, 2-7/8" x 5-112"
VBRS Upper and Lower Cavities,
Choke Valves 1-15, Manual and Super
Choke, Choke and Kill Manuals and
HCRs, 4" Valve on Kill Line, 4" TIW &
Dart, Upper and Lower IBOP.
Performed Koomey drawdown and
alarm test (ALL PASS) Witness
Waived by AOGCC Representative
Adam Earl.
Page 16158
ReportPrinted: 8/1212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Oepth
Start Time
EM Time
our (hr)
Phase
Op Code
AcWty Cade
Time P -T-%
Operation
(RKB)
End Depth(W13)
6/24/2019
6/24/2019
1.50
INTRMI
WHDBOP
BOPE
P
Rigged down test equipment, pulled
0.0
0.0
06:15
07:45
test plug, installed wear bushing.
6/24/2019
6124/2019
2.00
INTRMI
DRILLOUT
BHAH
P
Made up 6-1/2" BHA as per SLB on
0.0
346.0
07:45
09:45
elevators from surface to 346' MD.
monitored displacement on pit 8, pick
up weight - 55k, Slack off weight - 50k.
SIMOPS Annular LOT with 300 bbls
water flush and 61 bbls freeze protect.
6/24/2019
6/24/2019
1.50
INTRMI
DRILLOUT
SVRG
P
Service top drive blocks.Trouble shot
346.0
346.0
09:45
11:15
decoder on Drawworks, continued to
run operations with one motor without
issue until solved.
6/24/2019
6/24/2019
2.50
INTRM1
DRILLOUT
PULD
P
Continue to pick and RIH with 4.0"
346.0
3,000.0
11:15
13:45
doubles on elevators from 346'to
3000' MD while monitoring
displacement in pit 8. Pick up weight -
84k, Slack off weight - 72k, filling
every 30 doubles.
6/24/2019
6/24/2019
2.00
INTRM1
DRILLOUT
PULD
P
Shallow hole test as per SLB Log 90'
3,000.0
3,193.0
13:45
15:45
for free ringing pipe signature from
3000'to 3,193' MD at 240 GPM and
1,330 psi at 450 ft/Hr. Pick up weight -
86k, Slack off weight - 72k. No
signature/confirmation.
6/24/2019
6/24/2019
2.25
INTRMI
DRILLOUT
PULD
P
Continue to pick and RIH with 4.0"
3,193.0
5,351.0
1545
1800
Doubles on elevators from 3,193' to
5,351' MD while continuing to monitor
fluid displacement on pit 8. Pick up
weight - 90k, Slack off weight - 75k
while filling every 30 doubles.
6/24/2019
6/25/2019
6.00
INTRMI
DRILLOUT
PULD
P
Continue RIH on elevators with 4.0"
5,351.0
9,533.0
18:00
00:00
Doubles from 5,351' to 9,533' MD
while monitoring fluid displacement on
pit 8. Pick up weight — 120k, Slack off
weight — 80k filling pipe every 30
doubles/20 stands. Performed sonic
logging at 5,351'to 5,541', 5,984 to
6,048', 6,681 to 6,744' MD, pumped
a2 240 gpm with 1,675 psi while
logging.
6/25/2019
6/25/2019
6.00
INTRMI
DRILLOUT
PULD
P
Continue RIH with single 4.0" 14.0#
9,533.0
12,098.0
00:00
06:00
DP on elevators from 9,533'to 11,658'
MD while monitoring fluid
displacement in pit 8. Continue to fill
on every 20 stands. Sonic logged from
11,658'to 12,098' MD. Pump rate, 240
gpm at 1,950 psi at 11,658 while
logging.
6/25/2019
6/2512019
4.75
INTRMI
DRILLOUT
PULD
P
Continued RIH with singles on
12,098.0
13,328.0
06:00
10:45
elevators utilizing the mousehole for
connections from 11,658'to 13,328'
MD while continuing to monitor fluid
displacement in pit 8. Performed sonic
log at 450 ft/hr. with 240 gpm at 1950
psi. Flow out was 12%, Pick up weight
—124k, Slack off weight — 90k.
6125/2019
6/25/2019
1.25
INTRMI
DRILLOUT
PULD
P
Continue to RIH on elevators with
13,328.0
13,741.0
10:45
12:00
singles from 13,328'to 13,741' MD
while monitoring fluid displacement in
pit 8. Performed sonic log in recorded
mode as per SLB at 900 ft/hr. Pick up
weight 220k, Slack off weight -101 k.
Total loses - 0, / O.A. pressure; 435
psi at 11:30.
Page 17/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stmt Depth
Start Time
End Time
our (hr)
Phase
Op Code
Aclivity Cade
Time P -T -X
Operation
(flKB)
End Depth (W13)
6/25/2019
6/25/2019
4.00
INTRMI
DRILLOUT
PULD
P
Continue to RIH on elevators utilizing
13,741.0
14,150.0
12:00
16:00
mousehole for connections from
13,931' to 14,150' MD while
monitoring fluid displacement in pit 8.
Performed real time sonic log at 250
fl/hr. with 240 gpm at 2,170 psi, flow
out 11 % and identified /correlate RA
tag per SLB. Pick up weight - 2201k,
Slack off weight- 101k.
6/25/2019
6/25/2019
1.50
INTRM1
DRILLOUT
PULD
P
Rig up to pressure test casing and
14,150.0
14,150.0
16:00
17:30
annulus. Tested to 3,500 psi for 30
min, Test good. Bled pressure and laid
down test equipment.
6/25/2019
6/25/2019
1.00
INTRMI
DRILLOUT
SLPC
P
Conducted a PJSM for Slipping and
14,150.0
14,150.0
17:30
18:30
Cutting Drill Line and slipped 55' of
new tine on the drum. Recalibrated
blocks, and Totco.
6/25/2019
6/25/2019
0.50
INTRMI
DRILLOUT
SVRG
P
Swiced, Top drive, Blocks, washpipe
14,150.0
14,150.0
18:30
19:00
1
1
land crown assebly.
6/25/2019
6/25/2019
0.50
INTRMI
DRILLOUT
PULD
P
Established drilling parameters and
1,415.0
14,150.0
19:00
19:30
checked SLB tools. Pick up weight -
105k, Slack off weight - 105k, ROT =
147k, Torque - 15k Ft/lbs., GPM - 180
with 1,375 psi.
6/25/2019
6/26/2019
4.50
INTRMI
DRILLOUT
PULD
P
Reamed down from 14,150'to 14,251'
14,150.0
14,290.0
19:30
00:00
MD. Encountered 5k WOB and drilled
through obstruction with 18k Nibs.
between 60 - 100 rpms with 1,425 psi
and a 180 gpm. Tagged plugs at -
14,251' MD and continued to drill
cement and shoe track. Continue to
drill the 20' rat hole, and 20' of new
hole to 14,290 MD'
6/26/2019
6/26/2019
2.00
INTRMI
DRILLOUT
PULD
P
Continue to drill new hole to 14,390'
14,290.0
14,390.0
00:00
02:00
MD, Back reamed through shoe and
racked back one stand in prep for FIT.
6/26/2019
6/26/2019
2.00
INTRMI
DRILLOUT
CIRC
P
CBU and establish consistent mud
14,390.0
14,341.0
02:00
04:00
weight in and out at 200 gpm and
2,180 psi rotating at 40 rpms. Pick up
weight - 260k, Slack off weight 110k
while reciprocating 40' sections above
the shoe. Total strokes -4,085. OWFF
for 10 min. - Well static.
6/26/2019
6/26/2019
1.00
INTRMI
DRILLOUT
FIT
P
Conducted PJSM and rigged up for
14,341.0
14,341.0
04:00
05:00
formation integrity test. Flooded lines
and functioned BOP equipment.
Performed test to the specified
requirements; 12.5 ppg at 739 psi
max, total bbls pumped -14. Test
good. Rigged down test equipment,
blew down kill and cement lines.
Observed Well for Flow for 10 min.
Well Static.
6/26/2019
6/26/2019
1.00
INTRMI
DRILLOUT
MPDA
P
Conducted PJSM for pulling trip nipple
14,341.0
14,390.0
05:00
06:00
and the installation of RCD bearing.
Removed trip nipple and installed
bearing as per MPD Rep. Picked up
one stand and ran back to bottom.
Page 18/58 Report Printed: 8/1212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Sten Depth
SW Time
End Time
Our (Fir)
pease
Op Code
Activity Cade
Time P -T-%
Operation
(flKB)
End Depth (M(B)
6/26/2019
6/26/2019
4.00
PRODi
DRILL
DDRL
P
Drilled 6-1/2" production hole from
14,390.0
14,526.0
06:00
10:00
14,390'to 14,526' MD at 7,504' TVD
with 240 gpm and 2,759 psi. Observed
10% flow out at 60 rpms and 100 ft/hr.
Torque, 20k fl/lbs. WOB between 10-
15k lbs. ECD's were noted at 11.67
with a bottom pressure at 2,693 psi.
Pick up weight -260k, slack off weight
—110k. ROT was 105k at 21 k Ft/lbs.
ADT, Bit, and jar time — 1.87 hrs. Prep
to strip out of hole — SLB tool failure.
6/26/2019
6/26/2019
0.75
PROD1
DRILL
SMPD
T
Stripping out hole from 14,526'to
14,526.0
14,310.0
10:00
10:45
14,310' MD with MPD. 240 psi pulling
and 100 psi in slips at 1000ff/hr. Flow
out — 8%, Pick up weight — 285k,
Slack weight -120k.
6/26/2019
6/26/2019
0.50
PROM
DRILL
OWFF
T
Observed well for flow for 30 -min. Well
14,310.0
14,310.0
1045
11:15
Static.
6/26/2019
6/26/2019
0.75
PROD1
DRILL
SMPD
T
Continue to strip out of hole from
14,310.0
13,200.0
11:15
12:00
14,310'to 13,200' MD with MPD. Back
pressure 380 psi while pulling and 100
psi in slips at 4,0001111hr. Flow out was
at 8% Pick up weight - 285k, slack off
- 120k while monitoring fluid
displacement in pit 8.
6/26/2019
6/26/2019
1.75
PRODt
DRILL
SMPD
T
Continue to strip out of hole from
13,200.0
11,935.0
12:00
13:45
13,200'to 11,935' MD with MPD. Back
pressure 380 psi while pulling, and
100 psi in slips at 4,000ff/hr. Flow out
increased to 9%. Pick up weight —
250k, slack off weight —11 ok while
monitoring fluid displacement in pit 8.
6/26/2019
6/26/2019
0.50
PROD1
DRILL
SMPD
T
Identified flow discrepancy and swap
11,935.0
11,935.0
13:45
14:15
from mud pump 2 to 1 on the injection
line. Identified faulty popoff on pump
2, change valve and continued with
operation. SIMOPS—serviced top
drive and iron roughneck.
6/26/2019
6/26/2019
3.75
PROM
DRILL
SMPD
T
Continue to strip out of hole with MPD
11,935.0
7,008.0
14:15
18:00
from 11,935'to 7,008' MD with MPD.
Back pressure 272 psi while pulling
and 100 psi in slips at 5.000ft/hr. Flow
out remained at 9%, Pick up weight -
170k, slack off weight — 70k while
monitoring fluid displacement in pit 8.
6/26/2019
6/27/2019
6.00
PRODt
DRILL
SMPD
T
Continue to strip out of hole with MPD
7,008.0
406.0
18:00
00:00
from 7,008'to 406' MD. Back
pressure, 241 psi while pulling, 100
psi while in slips at 5,000ft/hr. Flow
out, 9%, Pick up weight -250k, Slack
off weight — 110k while monitoring
displacement in pit 8. Observed well
for flow for 15 -min. Well Static.
Conducted PJSM for removing RCD
bearing and installation of the trip
nipple. Shut pumps down and line up
on hole fill over top and manually
strapping the trip tank. Pulled back in
derrick one stand and prep for laying
down BHA. CA pressure at 17:00 —
460 psi. Losses for tour — 0.0 Ms.
Page 19158 ReportPrinted: 8/12/2019
Uperations Summary (with Timelog Depths)
CDS-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Siert Depth
StartTime
End Tune
our (hr)
Phase
Op Cme
Activity Cade
Time P -T -X
Operation
(flKB)
End Depth (aKB)
6/27/2019
6/27/2019
2.50
PROD?
DRILL
BHAH
T
Conducted PJSM for laying down
406.0
0.0
00:00
02:30
BHA. Pulled and laid down the BHA
#3 as per SLB rep. Racked back jars
and HWDP, laid down the remaining
BHA assembly. Removed and
inspected bit no physical damage
noted. Pick up weight -50k, Slack off
weight 49k. Removed power drive
sleeve and replaced. Cleaned rig floor
and picked up BHA #4.
6/27/2019
6/27/2019
0.50
PRODt
DRILL
SVRG
P
Serviced blocks, top drive, wash pipe,
0.0
0.0
02:30
03:00
and changed dies in the ST -80.
6/27/2019
6/27/2019
2.00
PROD1
DRILL
BHAH
T
Conducted PJSM for picking up BHA
0.0
373.0
03:00
05:00
#4. Made up the BHA from surface to
373'. Picked up tools from pipe shed
and torqued as per SLB rep.
6/27/2019
6/27/2019
1.00
PROD1
DRILL
TRIP
T
Tripped BHA into hole on elevators
373.0
1,763.0
05:00
06:00
from 373'to 1,763' MD. Pick up weight
— 70k, slack off weight — 60k with
continuous hole fill. Applied tripping
schedule and filled pipe every 20
stands while monitoring fluid
displacement in pit 8.
6/27/2019
6/27/2019
6.00
PROD1
DRILL
TRIP
T
Continued to trip in hole with BHA #4
1,763.0
10,900.0
06:00
12:00
on elevators as per tripping schedule
from 1,763'to 10,900' MD. Pick up
weight— 105k, slack off - 70k. Filling
pipe every 20 stands while monitoring
fluid displacement in pit 8. SIMOPS—
Finished commissioning NOVOS as
per NOV Rep. O.A. Pressure at 03:00
—135 psi / Tour losses — 0.0.
6/27/2019
6/27/2019
2.75
PROD1
DRILL
TRIP
T
Continue to trip in hole on elevators as
10,900.0
14,124.0
1200
14:45
per schedule from 10,900' to 14,124'
MD. Pick up weight - 273k, slack off
weight - 140k filling every 20 stands.
Continue to monitor fluid displacement
in pit 8. Changed iron roughneck
hose.
6/27/2019
6/27/2019
0.75
PROD1
DRILL
OWFF
T
Observed well for flow for 10 min. Well
14,124.0
14,124.0
14:45
15:30
Static. Pulled Trip nipple and installed
RCD bearing.
6/27/2019
6/27/2019
1.25
PROW
DRILL
REAM
T
Wash and ream from 14,124'to
14,124.0
14,402.0
15:30
16:45
14,402' MD at 220 gpm and 1,935 psi
with a rotating weight of 119k while
closing MPD chokes on connections.
6/27/2019
6/27/2019
0.25
PROD1
DRILL
SMPD
T
Bail struck derrick, recorded
14,402.0
14,303.0
16:45
17:00
equipment damage, right side bail
from drillers cabin struck lower derrick
support bracket. Assessed damage
and stripped out of hole 2 stands into
shoe from 14,402'to 14,303' MD and
secured well. Pick up weight -290k,
slack off weight 140k.
6/27/2019
6/28/2019
7.00
PROD1
DRILL
RGRP
T
CPAI management was notified and
14,303.0
14,303.0
17:00
00:00
1st report generated. Conducted a
safety stand down meeting followed
with a detailed assessment of the
damaged equipment. Weld repair
required to the lower support member
on derrick followed by a full visual
inspection of the derrick, top drive and
rail assembly and pipe elevator. Both
bails removed and replaced, pending
inspection. O.A pressure - 200 psi,
total tour losses - 0.0
Page 20/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
%0
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stat) Depth
Stall Time
End Time
our (hi
Phase
Op Cade
Adivity Code
Time P -T -X
Operation
hKB)
End Depth(ftKB)
6/28/2019
6/28/2019
0.50
FROM
DRILL
DDRL
P
Re-setAmphion and crown o-matic,
14,303.0
14,303.0
0000
00:30
adjusted link tilt compensating for the
long bails. Function tested bail
positioning for board clearance, and
calibrated blocks accordingly.
6/28/2019
6/28/2019
2.00
FROM
DRILL
DDRL
P
Bled pressure off MPD and tripped in
14,303.0
14,526.0
0030
02:30
one stand on elevators through the
shoe. Observed 81k WOB and
continued to run in hole. Functioned
SLB tooling while circulating and
reciprocating from 14,431'to 14,526'
MD looking for gas. Circulated at 220
gpm and 2,025 psi with 19f ft/lbs. at 40
rpms. Pick up weight — 228k, slack off
weight — 1041k. Total Gas units
observed — 410 units
6/28/2019
6/28/2019
3.50
FROM
DRILL
DDRL
P
Drilling 6-1/2" production hole from
14,526.0
14,687.0
02:30
06:00
14,521 14,687' MD at 7,520 TVD.
Increased pump to 245 gpm with 11%
flow out at 1,810 psi while rotating at
120 rpms with 19k ft/lbs. Pick up
weight— 2201k, slack off weight — 1251k.
rotating weight — 144k with 171k ft/lbs.
ECD's — 10.1 — 10.3 ppg
6/28/2019
6/28/2019
6.00
PROD1
DRILL
DDRL
P
Continue drilling from 14,687'to
14,687.0
15,544.0
06:00
12:00
15,544' MD, 7,518' TVD. Pumps
remained at 245 gpm with slight
increase of 14% flow out at 2,240 psi
while rotating at 160 rpms with 10K
ft/lbs. 19k weight on bit. Off bottom
pressure - 2,200 psi, pick up weight -
190k, slack off weight 1251k with a
rotating weight of 144k, and 17k ft/lbs
6/28/2019
6/28/2019
6.00
FROM
DRILL
DDRL
P
Continue to drill 6-1/2" hole from
15,544.0
16,585.0
1200
1800
15,544'to 16,585' MD, 7,523 TVD.
Pumps at 270 gpm with 171k weight on
bit 2,440 psi. w/pumps on and off.
Continue to rotate at 160 rpms with 10
-12k Ft/lbs. Pick up weight 1861k, slack
off weight 1171k and string weight -
144k. Torque — 5k f1/lbs., observed
slight ECD increase to 10.7 ppg with
total units of gas, 3237.
6/28/2019
6/29/2019
6.00
FROM
DRILL
DDRL
P
Continue to drill 6-1/2" hole from
16,585.0
17,633.0
18:00
0000
16,585'to 17,633' MD, 7,530' ND.
with 18k on bit. Flow in is at 270 gpm
with 2,720 psi, pumps off -2,675 psi.
Continue to rotate at 160 rpms with 10
-12k ft/lbs. Pick up weight— 187k,
slack off weight — 114k. String weight
— 145k at 6k fl/fibs. ECD's — 11.5 ppg,
total units of gas — 4200. ADT — 13.93,
hrs, Bit hrs. — 13 93, Jar hrs. — 15.80.
Page 21/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
SW Depth
Start Time
End Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(M1KB)
End Depth(WB)
6/29/2019
6/29/2019
6.00
PROD1
DRILL
DDRL
P
Continue drilling 6-1/2" production
17,633.0
18,264.0
00.00
06:00
hole with MPD from 17,633'to 18,260'
MD. TVD — 7,537', 10k weight on bit
with 270 gpm, and 2,760 psi with
pumps on, 2,665 psi w/pumps off at
120 rpms. Pick up weight 189k, down
weight 115k, string weight 147147k
w/7k ftAbs. ECD's 10.8 ppg, gas
returned 3,800 units. Encountered
Fault Et at 18,264' MD, stalled and
lost circulation, picked off bottom with
10k overpull, freed pipe and continued
to lose circulation. Pumped down drill
pipe at 2 bbl per min. with no returns.
Lined up injection pump and filled
backside at 25 gpm and 85 gpm on
drill pipe with 600 psi. Continued to
rotate at 10 rpm, pick up weight 190k,
slack off weight 115k.
6/29/2019
6/29/2019
1.75
PROD1
DRILL
CIRC
P
Continued to circulate at 84 gpm and
18,264.0
18,234.0
06:00
07:45
600 psi, pumped 30 bbl LCM pill,
squeezed in loss zone with 200 psi
back pressure, and recorded 75%
returns.
6/29/2019
6/29/2019
4.25
PROD1
DRILL
DDRL
P
Continued to drill ahead with MPD
18,264.0
18,768.0
07:45
12:00
from 18,264' to 18,768' MD, 7,562'
TVD with 18k weight on bit at 240 gpm
and 2,150 psi with pumps and 2,140
psi pumps off. Pipe rotation; 140 rpm
and 1O fUlbs. Pick up weight 192k,
down weight 112k and string weight
147k with 6k ft/lbs. readback. ECD's
10.6 ppg, and gas 4916 units.
6/29/2019
6/29/2019
6.00
PROD1
DRILL
DDRL
P
Continued to drill 6-1/2" production
18,768.0
19,270.0
12:00
18:00
hole with MPD from 18,768'to 19,270'
MD, 7,572' TVD. Weight on bit varied
between 4-18k at 240 gpm and 2,260
psi with pumps on and 2,260 psi
pumps off. Rotating pipe at 140 rpms
with a torque readback of 9-12k ft/lbs.
Pick up weight, 198k, down weight,
107k with a string weight of 143k and
7k fUlbs. torque. ECD's 10.48 ppg and
Gas returned — 2,905 units.
6/29/2019
6/30/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6-1/2" production hole
19,270.0
20,006.0
18:00
00:00
with MPD from 19,270'to 20,006' MD,
7,582 TVD. 4-18k weight on bit at 240
gpm and 2,260 psi with pumps on,
2,260 psi with pumps off. Rotating
between 120-140 rpms with 9 to 11k
ft/lbs. Pick up weight 198k, down
weight 106k, string/rotating weight
142k with a bottom hole torque of 13k
fl/lbs. ECD's 10.59 ppg, gas returned
2905 units. Pumped 20bbl Low vise,
and 20 bbl Hi Vise sweep at 19,340'
MO. Actual drilling time 3.63 hrs; Bit
time 24.69, Jar him 26.56. Daily tour
loss to formattion - 978 bbls
Page 22/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Dep[h
Start Time
End Time
Cur (m)
Phase
Op Corte
Activity Corte
Time P -T -X
Operation
(ftKB)
Eno Dept (ftKB)
6/30/2019
6/30/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill 6-1/2" production hole
20,006.0
20,856.0
00:00
06:00
with MPD from 20,006'to 20,856' MD,
TVD 7,591'. Weight on bit 4-20k, at
240 gpm with 2,390 psi pumps on and
2,345 psi pumps off. Rotating at 140-
150 rpms with 12-12k ft/lbs. Pick up
weight 198k, down weight 106k and
string weight 151 k with 13k ft/lbs.
ECD's 10.59 ppg gas returns 2,253
units. Pumped 21 -low and 20 bbl high
vise anti jamming sweep at 20,480'
MD. Actual drilling time 3.85 hrs, bit
time 33.19hrs, and jar time 35.06.
6/30/2019
6/30/2019
6.00
PROD1
DRILL
DDRL
P
Continue to drill production hole with
20,856.0
21,713.0
0600
1200
MPD from 20,856'to 21,713' MD, TVD
7,600'. Weight on bit 15-23k at 240
gpm with 2,455 psi with pumps on and
2,455 psi pumps off. Rotating at 140
rpms at 12k ft/lbs. Pick up weight
2005k down weight 86k and string
weight 139k with 9k ft/lbs. ECD's 10.9
ppg gas returns 2,546 units. Pumped
a 24 bbl low and 14 bbl high vise anti -
jamming sweep at 21,170' MD. Actual
drilling time 4.04, Bit time 37.23 his,
and jar time 39.10 his
6/30/2019
6/30/2019
1.50
PROD1
DRILL
DDRL
P
Continue drilling production hole with
21,713.0
21,903.0
1200
1330
MPD from 21,713'to 21,903' MD, TVD
7,602. Weight on bit 19k at 261 gpm
at 2,930 psi with pumps off and 2,930
psi pumps off. Rotating at 140 rpms
with 16k ft/lbspick up weight 203k
down weight 203k and string weight
140k with 9k ftlbs. ECD's 10.9 ppg
actual drilling time .63, bit time 37.86
his, and jar time 39.73 hrs.
6/30/2019
6/30/2019
1.50
PRODi
DRILL
SIPB
P
Conducted MPD Drawdown test for
21,903.0
21,903.0
1330
1500
ballooning and hydrostatic
overbalance at 5 rpms and 9k ft/lbs
Data / Charts submitted to engineering
for review. Verified well is breathing,
Ballooning.
6/30/2019
6/30/2019
3.00
PRODi
DRILL
DDRL
P
Continued to drill production hole with
21,903.0
22,379.0
15:00
18:00
MPD from 21,903'to 22,379' MD,
7,601' TVD. Weight on bit 19k at 261
gpm with 2,930 psi [umps on and
2,930 psi with pumps off. Rotating at
140 rpms with 16k fUlbs. Pick up
weight 203k, down weight 83k and
string weight 140k and 9k fUlbs. ECD's
11.1 gas return 5,828 units. Actual
drilling time 1.7 hrs, bit time 39.56 furs,
and jar time 41.43 hrs.
6/30/2019
7/1/2019
6.00
PROD1
DRILL
DDRL
P
Continued to drill 6-1/2" production
22.379.0
23,205.0
18:00
00:00
hole with MPD from 22,379' to 23,205'
MD, TVD 7,601'. Weight on bit 19k
ft/lbs. with 261 gpm at 2,930 psi with
pumps on, pumps off 2,930 psi.
Rotating at 140 rpms with 16k ft/lbs.
Pick up weight 203k down weight 83k,
and string weight 140k with 9k ft/lbs.
ECD's 11.13 ppg, max gas returns
5,828 units. Actual drilling time 1.7 hrs,
Bit time 39.56, and Jar time 41.43 hrs.
Page 23158 ReportPrinted: 8/12/2019
uperations Summary (with Timelog Uepths)
CD5-98
is
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depth
start Time
End Time
D,ir(ho
Phase
DIP Code
Activity Code
Time P -T -X
Operation
(RK8)
End Depth(RKB)
7/1/2019
7/1/2019
4.75
PROD1
DRILL
DDRL
P
Continued to drill with MPD from
23,205.0
23,475.0
00:00
04:45
23,205' to 23,475' MD and 7,607' TVD
at 240 gpm and 2,790 psi with pumps
on and 2,725 psi with pumps off.
Rotating at 140 rpms with torque
ranging between 14-16k ft/lbs. Pick up
weight 206k, down weight 101k and
string/rotating weight at 140k and 9k
fl/lbs. ECD's - 11.19 ppg with 2,353
units of gas returned. Pumped a Low -
high visc anti -jamming sweep at
23,370' MD and again at 23, 410' MD.
Actual Drilling time -2.13 hrs, Bit time
— 45.77 hrs, Jar time — 47.64 trouble
shooting MWD tooling
7/1/2019
7/1/2019
2.00
PROD1
DRILL
CIRC
T
Circulated bottoms up and
23,475.0
23,424.0
04:45
06:45
reciprocated pipe at 240 GPM with
2,960 psi at 40 rpms with 10k fUlbs.
flow back at 11 % racked back one
stand 23,424' MD.
7/1/2019
7/1/2019
0.50
PROD1
DRILL
SVRG
T
Changed out top drive bell guide and
23,424.0
23,424.0
06:45
07:15
adjusted tilt link clamps.
7/1/2019
7/1/2019
4.75
PROD1
DRILL
BKRM
T
Back reamed out of hole from 23,424'
23,424.0
21,333.0
07:15
12:00
to 21,.330' MD at 200 gpm and 1,620
psi with 120 rpms and 10k ft/lbs. 8%
flow back.
7/1/2019
7/1/2019
6.00
PROD1
DRILL
BKRM
T
Continue to back ream out of hole
21,333.0
18,103.0
12:00
18:00
from 21,333'to 18,103' MD with 200
gpm and 1,501 psi at 120 rpms. 61k
It/lbs. and 10% flow out. Pick up
weight 180k down weight 117k,
string/rotating weight 146k with 5-6k
fit/lbs
7/1/2019
7/2/2019
6.00
PROD1
DRILL
SIPS
T
Circulated bottoms up to remove gas
18,103.0
18,103.0
18:00
00:00
in well, prepped for finger printing in
efforts to determine pore pressure.
Circulated 9.0 ppg, 6,200 total strokes
pumped and observed 626 units of
returned gas. Conducted test while
monitoring pressures and volumes at
MPD monitor and trip tank. Starting
pressure 249 psi with a final shut of
130 psi. Total volume bled to tank
23.85 bbls. Circulated bottoms up to
clear well of any induced gas. Pumped
at 245 gpm w 2,195 psi. Gas units
returned 4,308. Performed SIMOPS—
processed 4.5 production liner in pipe
shed. O.A. pressure @ 23:00 — 185
psi; total losses 137 bbls.
7/2/2019
7/2/2019
1.00
PROD1
DRILL
CIRC
T
Continue circulating bottoms up to
18,103.0
18,103.0
0000
01:00
remove gas in well. 245 gpm, 2,195
psi. 6,825 strokes pumped (687 bbls)
pumped with total gas of 4308 units.
7/2/2019
7/2/2019
4.50
PROD1
DRILL
SMPD
T
Strip Out Of Hale from 18,103' MD to
18,103.0
14,300.0
01:00
0530
14,300' MD maintaining Back
Pressure Through MPD chokes and
supplying pressure through the
injection line using Mud Pump #1 @ 5
bpm. PU Wt = 1831k, SO Wt = 110k.
Monitoring Displacement on Trip Tank
and manually strapping the pit every 5
stands
OA Pressure @ 05:00 170 psi.
Page 24158 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Depth
Stan Time
End Time
our(hr)
Phese
Op Code
Activity Code
Time P -T-%
Dpamon
(Po(B)
End Depth (aKB)
7/2/2019
7/2/2019
0.50
PRODI
DRILL
SVRG
T
Serviced Top Drive, Wash Pipe & ST-
14,300.0
14,300.0
05:30
06:00
80. Replaced dies on ST -80 and
pressured washed Wash Pipe.
SIMOPS: Removed Fluid from Pits to
prepare for 9.7 ppg Brine
Displacement.
7/2/2019
7/2/2019
1.50
PROD1
DRILL
CIRC
T
Circulate @ 215 gpm, 1565 psi, 10%
14,300.0
14,300.0
06:00
07:30
FO, Weight Up Brine to 9.7 ppg and
prepare pits for displacement.
7/2/2019
7/2/2019
2.25
PROD1
DRILL
CIRC
T
Displace well to 9.7 ppg Visoosifed
14,300.0
14,300.0
07:30
09:45
Brine: Pump 30 bbl Hits 9.7 ppg
spacer, pump 664 bola 9.7 ppg
Viscosifled Brine @ 263 gpm, ICP
2950 psi, FCP 1660 psi, 40 rpm, 3-4k
TO, 12% FO, 33 bbls lost during
displacement.
7/2/2019
7/2/2019
0.75
PROD1
DRILL
OWFF
T
Shut in MPD chokes 93 psi, 65psi
14,300.0
14,300.0
09:45
10:30
after 20 minutes. Bleed off pressure in
4 stages. 3.5 bbls returned.
7/2/2019
7/2/2019
1.00
PROD1
DRILL
OWFF
T
OWFF @ RCD: Initial Flow 3.2 bph,
14,300.0
14,300.0
10:30
11:30
after 60 minutes .36 bph.
7/2/2019
7/2/2019
0.50
PRODI
DRILL
SMPD
T
Strip Out Of Hole from 14,300' MD to
14,300.0
13,826.0
11:30
12:00
13,826' MD with 4" Drill Pipe being
racked back in Derrick. PU Wt: 174k,
SO Wt = 130k; holding back pressure
via MPD, 50 psi in slips, 190 psi out of
slips. Monitor Displacement via pit 3.
Tour losses = 37 bola
7/2/2019
7/2/2019
6.00
PROD1
DRILL
SMPD
T
Continue Stripping Out Of Hole from
13,826.0
2,178.0
12:00
18:00
13,826' MD to 2,178' MD with 4" Drill
Pipe being racked back in Derrick. PU
Wt: 76k, SO Wt = 70k; holding back
pressure via MPD, 50 psi in slips, 190-
115 psi out of slips. Monitor
Displacement via pit 3.
7/2/2019
7/2/2019
1.50
PRODI
DRILL
SMPD
T
Continue Stripping Out Of Hole from
2,178.0
400.0
18:00
19:30
2,178' MD to 400' MO with 4" Drill Pipe
being racked back in Derrick. PU Wt:
50k, SO Wt = 50k; holding back
pressure via MPD, 50 psi in slips, 190-
115 psi out of slips. Monitor
Displacement via pit 3.
7/2/2019
7/2/2019
1.00
PRODI
DRILL
OWFF
T
Observe Well for flow via MPD valve.
400.0
400.0
19:30
20:30
(slows to no flow, STATIC)
7/2/2019
7/2/2019
0.75
PROD1
DRILL
MPDA
T
Remove RCD bearing and install trip
400.0
400.0
20:30
21:15
nipple and hole FII line.
OA Pressure @ 22:30 125 psi
7/2/2019
7/2/2019
1.75
PRODI
DRILL
BHAH
T
Rack back 4 stands of 4" HWDP and
400.0
0.0
21:15
23:00
jars. Lay Down SLB BHA #4 per SLB
Rep.
7/2/2019
7/2/2019
0.50
PROD1
DRILL
RURD
T
Clean and Clear Rig floor, move BHA
0.0
0.0
23:00
23:30
components and un needed BHA
Subs.
7/2/2019
7/3/2019
0.50
PRODI
DRILL
MPSP
T
Pull 6.875" wear ring and install test
0.0
0.0
23:30
00:00
plug in tubing spool.
SIMOPS: Prep for BOPE test.
Tour losses: 80.8 bbls
7/3/2019
7/3/2019
2.50
PROD1
WHDBOP
RURD
T
Rig Up test equipment. Flood with
0.0
0.0
00:00
02:30
water. Proceed with Body Test.
Contact AOGCC Inspector Lou
Laubenstein.
Page 25158 Report Printed: 8/12/2019
uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
start Time
End Time
our (hr)
Phase
Op Cade
Advity Code
Time P -T -X
Operabon
(RKB)
End Depth mK8)
7/3/2019
7/3/2019
5.00
PROW
WHDBOP
BOPE
T
Test BOPE. Test witnessed by
0.0
0.0
02:30
07:30
AOGCC Representative Lou
Laubenstein. All tests 250 psi Low /
3,500 psi High. 5 min High / Low, all
charted, Manual and Super Choke
tested 250 psi Low / 2000 psi High.
Tested with 4" and 4.5" test joints. Test
Annular, Upper VBR 2-7/8"x5", Lower
VBR 2-7/8"x5", Chokes Valves 1-15,
Manual and Super Choke, Choke and
Kill Manual and HCRs, 4" valve on kill
line, XT39 FOSV, XT39 Dart Valve,
Lower IBOR Perform Koomey
Drawdown, Accumulator Pressure
3000 psi, Manifold Pressure 1500 psi,
Accumulator 1600 psi after all
functions on bottles, 15 sec for 200 psi
build, 102 seconds to full system
pressure with electric pump and air
pumps. 6 bottle Nitrogen Average
1883 psi, Closing Time Annular 23
seconds, Upper VBR 21 seconds,
Blind/Shear Rams 16 seconds, Lower
Pipe Rams 17 seconds, Choke HCR 2
seconds, Kill HCR 2 seconds.
Witnessed by AOGCC Representative
Lou Laubenstein.
7/3/2019
7/3/2019
1.00
PROD1
WHDBOP
RURD
T
Rig Down, Blow Down all test
0.0
0.0
07:30
08:30
equipment.
SIMOPS: Prep for Upper IBOP
Change Out. Install Grease Fitting on
top drive traction motor.
702019
7/3/2019
0.50
PROD1
WHOBOP
MPSP
T
Pull test plug, Install wear ring (7" ID).
0.0
O.0
08:30
09:00
Lay Down Test Joint.
7/3/2019
713/2019
5.00
PROD1
WHDBOP
RGRP
T
Change Out Upper IBOP and Saver
0.0
0.0
09:00
14:00
Sub. Monitor well on pit 3. (6 bph
static loss rate)
7/3/2019
7/3/2019
1.75
PRODi
WHDBOP
BOPE
T
Test Upper IBOP and Saver Sub to
0.0
0.0
14:00
15:45
250 psi Low / 3,500 psi High
(Charted). Witness of this particular
retest waived by AOGCC
Representative Lou Laubenstein (all
previous test witnessed). Change Out
3 valves on BOP Test Manifold.
7/3/2019
7/3/2019
2.25
PROD1
DRILL
SLPC
T
Slip and Cut 141' of Drilling Line (18
0.0
0.5-
15:45
18:00
wraps).
SIMOPS: Install 132" Top Drive Bails
and 4" elevators, Calibrate Block
Height, Change Out Wash Pipe,
Adjust Link Tilt.
7/3/2019
7/3/2019
0.25
PROD?
DRILL
SFTY
T
PJSM Pick Up BHA #5 with SLB DO
0.0
0.0
18:00
18:15
and MWD Rep.
7/3/2019
7/3/2019
2.25
PROD1
DRILL
BHAH
T
Pick Up BHA *5 and per SLB DO and
0.0
385.0
18:15
20:30
MWD Rep. Maintain Constant hole fill
over the top manually strapping trip
tank after BHA in hole.
7/3/2019
7/3/2019
3.25
PRODi
DRILL
TRIP
T
Trip in hole w/ BHA#5 from Derrick
385.0
2,000.0
20:30
23:45
checking hard band on Drill Pipe on
way in replacing bad joints with new
joints. Replaced 10 joints. Monitor
displacement on Pit #3 manually
strapping every 5 stands. PU Wt 80k,
SO Wt 72k.
7/3/2019
7/4/2019
0.25
PROD?
DRILL
CIRC
T
Pertorm Shallow Hole Test of BHA as
2,000.0
2,000.0
23:45
00:00
1
per SLB DO Rep. Pumped 220 gpm,
j
1190 psi.
Page 26158 Report Printed: 811212019
Uperations Summary (with Timelog Depths)
4
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Star) Depth
Steri Time
End Time
Dur (hr)
Phase
Do Code
ActVay Code
Time P -T -X
Operation
(RKB)
End Depth (ftKB)
7/4/2019
7/4/2019
6.00
PROD1
DRILL
TRIP
T
Trip in hole from 2000' MD to 8,498'
2,000.0
8,498.0
00:00
06:00
MD from the Derrick. Replace bad
hard band joints as found. Replaced
18 more joints (28 total so far) in the
string. Monitoring displacement on trip
with pit #3, manually strapping every 5
stands. Filled pipe every 20 stands.
7/4/2019
7/4/2019
5.00
PRODi
DRILL
TRIP
T
Trip in hole from 8,498' MD to 14,247'
8,498.0
14,247.0
0600
11:00
MD w/ 4" Drill Pipe from Derrick.
Replace bad hard band joints as
found. Replaced 4 more joints (32
total so far) in the string. PU Wt 1851k,
SO Wt 130k. Monitoring displacement
on trip with pit #3, manually strapping
every 5 stands. Filled pipe every 20
stands. Located RATag at 13,887'
MD.
OA Pressure @ 11:00 175 psi.
7/4/2019
7/4/2019
0.50
PRODt
DRILL
OWFF
T
Observe Well for Flow. (STATIC with
14,247.0
14,247.0
11:00
11:30
slight loss)
7/4/2019
7/4/2019
0.50
PROD1
DRILL
RURD
T
Pull Trip Nipple. Install MPD RCD
14,247.0
14,258.0
11:30
12:00
Bearing.
SIMOPS: OWFF (STATIC with slight
loss); PJSM, Circulate well over to 9.1
ppg FloPro Drilling Mud.
Tour losses 65 BBLs
7/4/2019
7/4/2019
3.00
PROD1
DRILL
CIRC
T
Displace well to 9.1 ppg FloPro drilling
14,258.0
14,258.0
12:00
15:00
mud. Pump 30 bbl HiMs spacer. Pump
639 bbl 9.1 ppg FloPro, 226 gpm, ICP
1,820 psi, FCP 2,000 psi. PU Wt 180
k, SO Wt 117k.
7/4/2019
7/4/2019
3.00
PROD1
DRILL
STRP
T
Strip in hole from 14,258' MD to
14,258.0
19,053.0
15:00
18:00
19,053' MD with 4" Drill Pipe from the
derrick holding 60 psi out of slips and
240 psi in slips. PU Wt: 203k, SO Wt
103k. Monitoring displacement on trip
with pit #4, manually strapping every 5
stands. Filled pipe every 20 stands.
7/4/2019
7/4/2019
2.50
PROD1
DRILL
STRP
T
Strip in hole from 19,053' MD to
19,053.0
23,037.0
18:00
20:30
23,037' MD with 4" Drill Pipe from the
derrick holding 60 psi out of slips and
240 psi in slips. PU Wt: 218k, SO Wt
109k. Monitoring displacement on trip
with ph #4, manually strapping every 5
stands. Filled pipe every 20 stands.
7/4/2019
7/4/2019
1.25
PROD1
DRILL
REAM
T
Ream last 5 stands to bottom while
23,037.0
23,475.0
20:30
21:45
Circulating Bottoms Up from 23,037'
MD to 23,475' MD. Performed
Downlink test per SLB DD. TQ 9k,
ROT Wt 145k, pumped 235 gpm,
2725 psi (breaking over to 2520 psi).
7/4/2019
7/5/2019
2.25
PROD1
DRILL
CIRC
T
Continue to Circulate Bottoms Up 240
23,475.0
23,475.0
21:45
00:00
gpm, 2750 psi, no rotation on stand
#243. PU Wt 197k, SO Wt 120k. Take
Slow Pump Rates.
Losses for day 226 BBLs.
7/5/2019
7/5/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 23,475'
23,475.0
23,762.0
00:00
06:00
MD to 23,762' MD, 7,607' TVD, 245
gpm, 3,225 psi on, 3,180 psi off, 30-60
rpm, 12 TO, 12-20 WOB, PU Wt 209k,
SO Wt 145k, ROT Wt 145k, TO 10k,
ECD 10.43 ppg, Max gas 875 units,
ADT 2.14, BIT hours 2.14, Jar hours
49.78. SPRs taken @ 00:00, 23,475'
MD.
Page 27158 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
I&
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depth
start Imre
End Time
our (hr)
Phase
op Code
Ar ity Code
Time P -T -X
Operation
(flKB)
End Depth (ttKB)
715/2019
7/5/2019
5.50
PRODi
DRILL
DDRL
P
Drill 6.5" production hole from 23,762'
23,762.0
24,141.0
06:00
11:30
MD to 24,141' MD, 7,612' TVD, 230
gpm, 3,360 psi on, 2,850 psi off, 70
rpm, 16k TO, 15-17k WOB, PU Wt
225k, SO Wt Not Available, ROT Wt
144k, TQ 11k, ECD 10.70 ppg, Max
gas 1,846 units, ADT 3.72, BIT hours
5.86, Jar hours 53.50.
7/5/2019
7/5/2019
0.25
PROD1
WHDBOP
RURD
P
Pull off bottom and Blow Down Top
24,141.0
24,141.0
11:30
11:45
Drive, Rig Up Head Pin to circulate,
100 gpm, 1110 psi. Rig Up Test lines.
7/5/2019
7/5/2019
0.50
PRODt
WHDBOP
BORE
P
Test Upper IBOP 250 psi Low / 3,500
24,141.0
24,141.0
11:45
12:15
psi High, 5 minutes each (Charted),
7/5/2019
715/2019
0.25
PROD1
WHDBOP
RURD
P
Rig Down test equipment and
24,141.0
24,141.0
12:15
12:30
circulating equipment, Blow Down Top
Drive
7/5/2019
715/2019
5.50
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 24,141'
24,141.0
24,565.0
12:30
18:00
MD to 24,565' MD, 7,620' TVD, 230
gpm, 3,400 psi on, 70 rpm, 14-16k
TO, 15k WOB, PU Wt 2251k, SO Wt
Not Available, ROT Wt 144k, TO 11 k,
ECD 10.80 ppg, Max gas 4,726 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 3.09, BIT hours 8.95, Jar
hours 56.59. SPRs taken @ 16:25,
24,425' MD.
7/5/2019
7/5/2019
2.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 24,565'
24,565.0
24,626.0
18:00
2000
MD to 24,626' MD, 7,621' TVD, 230
gpm, 3,080 psi on, 30 rpm, 9-10k TO,
7-8k WOB, PU Wt 215k, SO Wt 781k,
ROT Wt 139k, TO 11 k, ECD 10.76
ppg, Max gas 3,082 units, MPD Back
Pressure on 0 psi, off 280 psi, ADT
0.83, BIT hours 9.78, Jar hours 57.42.
7/5/2019
7/5/2019
3.50
PROD1
DRILL
CIRC
T
Troubleshoot MWD downlink.
24,626.0
24,565.0
20:00
23:30
Downlink attempted with different
parameters, different mud pumps,
different flow rates, etc. Downlink
attempted to be sent manually. No
confirmation of downlink success.
Contact CPAI Engineer. Attempt to
send new column of fluid down string
and send downlink as new fluid is at
tool.
7/5/2019
7/6/2019
0.50
PROD1
DRILL
CIRC
P
Obtain downlink and send survey to
24,565.0
24,626.0
23:30
00:00
confirm downlink while reciprocating
pipe. Pick up stand from derrick.
Losses for day 235 BBLs.
7/6/2019
7/6/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 24,626'
24,626.0
25,093.0
00:00
06:00
MD to 25,093' MD, 7,628' TVD, 12k
WOB, 230 gpm, 3,312 psi on, 70 rpm,
12-14k TQ, PU Wt 219k, SO Wt Not
Available, ROT Wt 142k, TO 12k, ECD
10.75 ppg, Max gas 3,046 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 3.82, BIT hours 13.6, Jar hours
61.24.
Page 28158 Report Printed: 8/12/2019
a' Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depth
Start Time
End Time
our (m)
Phase
Op Code
Activity Code
Time P -T -X
Operhon
(nKB)
End Depth (MS)
7/6/2019
7/6/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 25,093'
25,093.0
25,569.0
06:00
12:00
MD to 25,569' MD, 7,637' TVD, 15k
WOB, 230 gpm, 3,510 psi on, 70 rpm,
14-15k TO, PU Wt 226k, SO Wt Not
Available, ROT Wt 146k, To 11 k, ECD
10.96 ppg, Max gas 2,281 units, MPD
Baric Pressure on 0 psi, off 280 psi,
ADT 3.76, BIT hours 17.27, Jar hours
64.91. SPRs taken @ 10:57, 25,470'
MD.
7/6/2019
7/6/2019
6.00
PRODi
DRILL
DDRL
P
Drill 6.5" production hole from 25,569'
25,569.0
26,045.0
12:00
18:00
MD to 26,045' MD, 7,642' TVD, 6-15k
WOB, 230 gpm, 3,590 psi on (3,560
psi off), 70 rpm, 12-14k TO, PU Wt
221 k, SO Wt Not Available, ROT Wt
145k, TO 13k, ECD 11.09 ppg, Max
gas 2,286 units, MPD Back Pressure
on 0 psi, off 280 psi, ADT 3.22, BIT
hours 20.49, Jar hours 68.13.
7/6/2019
7/7/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 26,045'
26,045.0
26,288.0
18:00
00:00
MD to 26,288' MD, 7,639' TVD, 6-15k
WOB, 230 gpm, 3,590 psi on, 70 rpm,
12-14k TO, PU Wt 221 k, SO Wt Not
Available, ROT Wt 145k, TO 12-14k,
ECD 10.89 ppg, Max gas 330 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 2.40, BIT hours 22.89, Jar
hours 70.53.
Losses for day 769 BBLs.
7/7/2019
7/7/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 26,288'
26,288.0
26,712.0
00:00
0600
MD to 26,712' MD, 7,663' TVD, 6-15k
WOB, 230 gpm, 3,486 psi on, 70 rpm,
12-14k TO, PU Wt 227k, SO Wt Not
Available, ROT Wt 148k, TO 12k, ECD
10.97 ppg, Max gas 209 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 3.49, BIT hours 26.38, Jar hours
74.02.
7/7/2019
7/7/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 26,712'
26,712.0
26,886.0
06:00
12:00
MD to 26,886' MD, 7,668' TVD, 6-15k
WOB, 230 gpm, 3,590 psi on, 70 rpm,
12-14k TO, PU Wt 227k, SO Wt Not
Available, ROT Wt 148k, TO 121k, ECD
11.09 ppg, Max gas 2,286 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 1.58, BIT hours 27.96, Jar hours
75.60.
7/7/2019
7/7/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 26,886'
26,886.0
27,271.0
12:00
18:00
MD to 27,271' MD, 7,681' TVD, 14k
WOB, 230 gpm, 3,712 psi on, 70 rpm,
15-16k TO, PU Wt 227k, SO Wt Not
Available, ROT Wt 148k, TO 12k, ECD
11.13 ppg, Max gas 2,213 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 2.84, BIT hours 30.80, Jar hours
78.44.
7/7/2019
7/8/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 27,271'
27,271.0
27,628.0
18:00
00:00
MD to 27,628' MD, 7,686' TVD, 14k
WOB, 230 gpm, 3,580 psi on, 70 rpm,
13-14k TO, PU Wt 230k, SO Wt Not
Available, ROT Wt 150k, TO 12k, ECD
11.13 ppg, Max gas 852 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 3.40, BIT hours 34.20, Jar hours
81.84.
Losses for day 837 BBLS.
Page 29158 Report Printed: 8/1212019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
sten oepm
Sten Mme
End Time
our (hr)
Phase
Op Code
AcN4 Code
Time P -T -X
Operation
(MHS)
End Depth (ftKa)
7/8/2019
7/8/2019
6.00
PROW
DRILL
DDRL
P
Drill 6.5" production hole from 27,628'
27,628.0
28,044.0
00:00
06:00
MD to 28,044' MD, 7,688' TVD, 12k
WOB, 225 gpm, 3,685 psi on, 75 rpm,
14-16k TQ, PU Wt 224k, SO Wt Not
Available, ROT Wt 146k, TO 13k, ECD
11.05 ppg, Max gas 789 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 4.37, BIT hours 38.57, Jar hours
86.21.
7/6/2019
7/8/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 28,044'
28,044.0
28,579.0
06:00
12:00
MD to 28,579' MD, 7,692' TVD, 15k
WOB, 225 gpm, 3,705 psi on, 75 rpm,
16-18k TO, PU Wt 236k, SO Wt Not
Available, ROT Wt 145k, TO 13k, ECD
11.30 ppg, Max gas 1,731 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 4.44, BIT hours 43.01, Jar hours
90.65. SPRs taken @ 11:14, 28,523'
MD.
7/8/2019
7/8/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 28,579'
28,579.0
29,094.0
12:00
18:00
MD to 29,094' MD, 7,696' TVD, 14k
WOB, 225 gpm, 3,778 psi on, 75 rpm,
15-17k TO, PU W1241 k, SO Wt Not
Available, ROT Wt 146k, TO 13.5k,
ECD 11.36 ppg, Max gas 2,311 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 4.19, BIT hours 47.20, Jar
hours 94.84.
7/8/2019
7/9/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 29,904'
29,094.0
29,570.0
18:00
00:00
MD to 29,570' MD, 7,702' TVD, 17k
WOB, 225 gpm, 3,880 psi on, 75 rpm,
15-18k TO, PU Wt 237k, SO Wt Not
Available, ROT Wt 149k, TO 14k, ECD
11.29 ppg, Max gas 1,652 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 4.52, BIT hours 51.72, Jar hours
99.36.
Losses for day 883 BBLS.
7/9/2019
7/9/2019
6.00
PROD?
DRILL
DDRL
P
Drill 6.5" production hole from 29,570'
29,570.0
29,855.0
00:00
06:00
MD to 29,855' MD, 7,704' TVD, 15k
WOB, 225 gpm, 3,715 psi on, 75 rpm,
15-17k TO, PU Wt 237k, SO Wt Not
Available, ROT Wt 149k, TO 14k, ECD
11.13 ppg, Max gas 780 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 2.73, BIT hours 54.45, Jar hours
102.09. SPRs taken @ 01:00, 29,567'
MD.
7/9/2019
7/9/2019
6.00
PRODt
DRILL
DDRL
P
Drill 6.5" production hole from 29,855'
29,855.0
30,370.0
06:00
12:00
MD to 30,370' MD, 7,709' TVD, 25-30k
WOB, 225 gpm, 3,790 psi on, 75 rpm,
17-19k TQ, PU Wt 238k, SO Wt Not
Available, ROT Wt 146k, TO 14k, ECD
11.35 ppg, Max gas 1547 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 4.29, BIT hours 58.74, Jar hours
106.38.
7/9/2019
7/9/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 30,370'
30,370.0
30,807.0
12:00
18:00
MD to 30,807' MD, 7,713' TVD, 10-14k
WOB, 225 gpm, 3,915 psi on, 75 rpm,
17-19k TO, PU Wt 245k, SO Wt Not
Available, ROT Wt 144k, TO 14.5k,
ECD 11.39 ppg, Max gas 1,545 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 4.12, BIT hours 62.86, Jar
hours 110.50. SPRs taken @ 14:23,
30,523' MD.
Page 30/58
Report Printed: 811212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
EM Time
our (hr)
Phase
Op Code
Activity Code
Time P-T-X
Operation
(flKe)
End Depth (flKI3)
7/9/2019
7/10/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 30,807'
30,807.0
31,190.0
18:00
00:00
MD to 31,190' MD, 7,715' TVD, 17k
WOB, 223 gpm, 3,900 psi on, 75 rpm,
17-18k TQ, PU Wt 241 k, SO Wt Not
Available, ROT Wt 149k, TO 15k, ECD
11.45 ppg, Max gas 579 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 4.22, BIT hours 67.08, Jar hours
114.72.
Losses for day 1,052 BBLs.
7/10/2019
7/10/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 31, 190'
31,190.0
31,524.0
00:00
06:00
MD to 31,524' MD, 7,717' TVD, 12k
WOB, 225 gpm, 3,960 psi on, 75 rpm,
18-20k TQ, PU Wt 243k, SO Wt Not
Available, ROT Wt 149k, TQ 16k, ECD
11.74 ppg, Max gas 789 units, MPD
Back Pressure on 0 psi, off 280 psi,
ADT 3.95, BIT hours 71.03, Jar hours
118.67.
7/10/2019
7/10/2019
6.00
PRODi
DRILL
DDRL
P
Drill 6.5" production hole from 31,524'
31,524.0
31,952.0
06:00
12:00
MD to 31,952' MD, 7,716' TVD, 9k
WOB, 225 gpm, 3,936 psi on, 75 rpm,
18-20k TQ, PU Wt 246k, SO Wt Not
Available, ROT Wt 142k, TQ 16.5k,
ECD 11.75 ppg, Max gas 926 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 4.40, BIT hours 75.43, Jar
hours 123.07.
7/10/2019
7/10/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 31,952'
31,952.0
32,320.0
12:00
18:00
MD to 32,320' MD, 7,721' TVD, 5k
WOB, 230 gpm, 3,990 psi on, 80 rpm,
19k TO, PU Wt 246k, SO Wt Not
Available, ROT Wt 142k, TQ 16.5k,
ECD 11.99 ppg, Max gas 994 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 3.90, BIT hours 79.33, Jar
hours 126.97.
7/10/2019
7/11/2019
6.00
PROD1
DRILL
DDRL
P
Drill 6.5" production hole from 32,320'
32,320.0
32,468.1
18:00
00:00
MD to 32,468' MD, 7,767' TVD, 11 k
WOB, 230 gpm, 4,070 psi on, 80 rpm,
19k TO, PU Wt 246k, SO Wt Not
Available, ROT Wt 142k, TQ 16.5k,
ECD 11.69 ppg, Max gas 347 units,
MPD Back Pressure on 0 psi, off 280
psi, ADT 4.45, BIT hours 83.78, Jar
hours 131.42.
Losses for day 1,075 BBLs.
7/11/2019
7/11/2019
6.00
PROD1
CASING
CIRC
P
While Circulating 2x Bottoms Up, Take
32,468.1
32,267.0
00:00
06:00
the final Survey, Lay Down Double,
Send Downlink to zero directional tool,
Rotate and Reciprocate from 32,454'
MD to 32, 267' MD at 248 gpm, 4,020
psi, 10% FO, 80 rpm, 18K TQ, 1,893
BBLs pumped. Lay Down 1 stand.
SPRs taken @ 05:30, 32,267' MD.
7/11/2019
7/11/2019
3.50
PRODi
CASING
SIPB
P
Perform pore pressure Draw Down via
32,267.0
32,267.0
06:00
0930
MPD, @ 32,367' MD, 5 rpm, TO 16K,
Start 414 psi, after 24 cycles, 157 psi,
49.5 BBLs bled back. Pore Pressure
9.4 pPg
7/11/2019
7/11/2019
2.50
PROD1
CASING
CIRC
P
Circulate Bottoms Up From 32,367'
32,267.0
32,158.0
09:30
12:00
MD to 32,158' MD, 248 gpm, 3,900
psi, 10% FO, 60 rpm, 18K TQ, ECD
11.54 ppg, Max Gas 3,440 units.
Page 31/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
t
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
sten Depth
sten Time
End Time
our (hr)
Phe a
Op Cove
Actrvf y Code
Time P -T -X
Opergon
(flKB)
End Depth (Wlt)
7/11/2019
7/11/2019
0.50
PROD1
CASING
CIRC
P
Continue to Circulate Bottoms Up from
32,158.0
32,158.0
12:00
12:30
32,158' MD to 32, 158' MD, 248 gpm,
3,900 psi, 10% FO, 60 rpm, 18K TO,
ECD 11.34 ppg, Max Gas 2,585 units.
Dropped 2.36" Drift w/ 120'tail into
stand 335.
7/11/2019
7/11/2019
5.50
PROD1
CASING
BKRM
P
BROOH from 32,158'MD to
32,158.0
30,188.0
12:30
18:00
30,188'MD, 235 gpm, 3,440 psi, 60
rpm, 19K TO, 11 % FO, ECD 11.25
ppg, Up Wt 236K, SO Wt Not
Available, ROT Wt 141k
7/11/2019
7/12/2019
6.00
PRODi
CASING
BKRM
P
BROOH from 30,188' MD to 28,450'
30.188.0
28,450.0
18:00
00:00
MD, 235 gpm, 3,440 psi, 60 rpm,
18.5K TQ, 11 % FO, ECD 11.05 ppg,
Up Wt 231 K, SO Wt Not Available,
ROT Wt 142K, pump 23 BBL Low Vis,
34 BBL Hi Vis @ 29,200' MD.
Losses for day 411 BBLs.
7/12/2019
7/12/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 28,450' MD to 27,000'
28,450.0
27,000.0
00:00
06:00
MD, 235 gpm, 3,000 psi, 60 rpm, 17-
19K TQ, 10 % FO, ECD 10.70 ppg,
MPD Back Pressure, off 280 psi. SO
Wt 78K, ROT Wt 142K.
7/12/2019
7/12/2019
4.00
PROD1
CASING
BKRM
P
Continue BROOH from 27,000' MD to
27,000.0
25,900.0
06:00
10:00
25,900' MD, 235 gpm, 3,000 psi, 60
rpm, 17-19K TQ, 10 % FO, ECD 10.70
ppg, MPD Back Pressure, off 280 psi.
PU Wt 225K, SO W181 K, ROT Wt
145K, 14K TO.
7/12/2019
7/12/2019
4.50
PROD1
CASING
CIRC
P
Displace well to 9.7 ppg Brine, (Held
25,900.0
25,820.0
10:00
14:30
PJSM) Rotate and Reciprocate from
25,900' MD to 25,820' MD, 235 gpm,
2,850 psi, 25 rpm, 15k TO, 10% FO.
1,430 BBLs pumped. 81 BBLs lost.
Take SPRs @ 25,876' MD.
7/12/2019
7/12/2019
2.00
PROD1
CASING
OWFF
P
Perform Well Draw Down via MPD,
25,820.0
25,820.0
14:30
16:30
initial build to 95 psi, after 12 cycles (1
of 30 sec, 3 of 1 min, 3 of 2 min, 4 of 4
min) 21 psi. 17 BBLs flowback.
7/12/2019
7/12/2019
5.50
PROD1
CASING
OWFF
P
OWFF using cup measurement. initial
25,820.0
25,820.0
16:30
22:00
flowback rate 10.71 BPH, measure
every 15 minutes with decreasing flow
rate to 0.67 BPH. Contact CPAI
Engineer. Flow is breathing. Decision
to Strip OOH.
7/12/2019
7/13/2019
2.00
PROD1
CASING
STRP
P
Strip Out of hole from 25,820' MD to
25,820.0
25,020.0
22:00
00:00
25,020 maintaining back pressure with
MPD and mud pump #2 @ 5 bpm.
MPD pressure in slips 120 psi, out of
slips 80 psi. PU Wt at star t was 245K,
PU Wt steadily rose to 269K, SO Wt
98K, Monitor Well Displacement on pit
#3.
Losses for day 405 BBLs.
7/13/2019
7/1312019
2.00
PROD?
CASING
BKRM
P
BROOH from 25,020' MD to 24,500'
25,020.0
24,500.0
00:00
02:00
MD, 235 gpm, 2,150 psi, 30 rpm, TO
14-16k, FO 8%, ECD 10.30 ppg, MPD
back pressure with pumps off 85 psi,
PU Wt 226K, SO Wt 81 K, Rot Wt
145K, TO 14K.
Page 32/58 Report Printed: 8112120191
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
shirt Depth
shirt Time
End Time
Dur (M)
Phase
op code
Activity Code
Time P -T -x
Operation
(WB)
End Depth (NCB)
7/13/2019
7/13/2019
1.00
PROD1
CASING
STRIP
P
Strip OOH from 24,500' MD to 24,327'
24,500.0
24,327.0
02:00
03:00
MD, maintaining back pressure with
MPD chokes and Pump #2 on
backside, 3 bpm, MPD back pressure
in slips 120 psi, out slips 80 psi, PU
Wt 226K, SO Wt 99K, Monitoring well
on pits #2 #3. Experienced overpull to
251 K. Circulate and Ream stand
down, Observe Gas measurement
rising at surface.
7/13/2019
7/13/2019
1.50
PROD1
CASING
CIRC
P
Circulate gas out while rotating and
24,327.0
24,325.0
03:00
04:30
reciprocating from 24,417' MD to
24,325' MD, 230 gpm, 2,138 psi, 50
rpm, TQ 15k, Max Gas 2427 units.
Pumped 518 BBLs.
7/13/2019
7/13/2019
1.50
PROD1
CASING
BKRM
P
BROOH from 24,325' MD to 23,750'
24,325.0
23,750.0
04:30
06:00
MD, 230 gpm, 1,900 psi, 50 rpm, TQ
14-16k, FO 8%, ECD 10.30 ppg, MPD
back pressure with pumps off 80 psi,
PU Wt 225K, SO Wt 95K, Rot Wt
149K,
7/13/2019
7/13/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 23,750' MD to 21,536'
23,750.0
21,536.0
06:00
1200
MD, 235 gpm, 2,013 psi, 50 rpm, TO
14-16k, FO 8%, ECD 10.32 ppg, MPD
back pressure with pumps off 80 psi,
PU Wt 220K, SO Wt 88K, Rot Wt
147K,
7/13/2019
7/13/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 21,536' MD to 19,517'
21,536.0
19,517.0
12:00
18:00
MD, 235 gpm, 1,890 psi, 50 rpm, TO
14-16k, FO 8%, ECD 10.32 ppg, MPD
back pressure with pumps off 80 psi,
PU Wt 213K, SO Wt 110K, Rol Wt
145K,
7/13/2019
7/14/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 19,517' MD to 17,350'
19,517.0
17,350.0
18:00
00:00
MD, 235 gpm, 1,840 psi, 50 rpm, TQ
14-16k, FO 8%, ECD 10.25 ppg, MPD
back pressure with pumps off 80 psi,
PU Wt 21 OK, SO Wt 108K, Rot Wt
148K,
Losses for day 263 BBLs.
7/14/2019
7/14/2019
6.00
PROD1
CASING
BKRM
P
BROOH from 17,350' MD to 15,361'
17,350.0
15,361.0
00:00
06:00
MD, 235 gpm, 1,840-1,620 psi, 50
rpm, TQ 9-16K, FO 8%, ECD 10.25
ppg, MPD back pressure with pumps
off 80 psi, PU Wt 185K, SO Wt 117K,
Rot Wt 145K, MWD went down at
02:20.
7/14/2019
7/14/2019
4.00
PROD1
CASING
BKRM
P
BROOH from 15,361' MD to 14,161'
15,361.0
14,161.0
06:00
10:00
MD, 235 gpm, 1,620 psi, 50 rpm, TO
12K, FO 8%, ECD Not Available, MPD
back pressure with pumps off 80 psi,
PU Wt 180K, SO Wt 115K, Rot Wt
145K,
7/14/2019
7/14/2019
2.00
PROD1
CASING
CIRC
P
Circulate and Reciprocate until Hole
14,161.0
14,070.0
10:00
12:00
clean from 14,161' MD to 14,070' MD,
235 gpm, 1620 psi, FO 9%, 60 rpm,
1 O TO off, Rol Wt 150K. 548 BBLs
Pumped.
7/14/2019
7/14/2019
1.75
PRODt
CASING
OWFF
P
OWFF per CPAI and MPD. PU Wt
14,070.0
14,070.0
12:00
13:45
200K, SO Wt 11 OK. SPRs taken a
12:00, 14,161' MD.
SIMOPS: Slip and Cut Drilling Line,
141'.
Page 33158 Report Printed: 8112120191
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depth
Stift Time
EM Time
our (le)
Phase
Op Code
Activity Code
Time P -T -X
Operelion
(RKB)
End Deptlt (flKB)
7/14/2019
7/14/2019
4.25
PROD1
CASING
STRIP
P
Strip OOH from 14,070' MD to 9,472'
14,070.0
9,472.0
13:45
16:00
MD per stripping schedule,
maintaining back pressure with MPD
chokes and Pump #1 on backside, 4
bpm, MPD back pressure in slips 80
psi, out slips 150 psi, PU Wt 130K, SO
Wt 80K, Monitoring well on pits #2 #3.
7/14/2019
7/14/2019
2.50
PROD1
CASING
STRIP
P
Strip OOH from 9,472' MD to 6,536'
9,472.0
6,536.0
18:00
20:30
MD per stripping schedule,
maintaining back pressure with MPD
chokes and Pump #1 on backside, 3.5
bpm, MPD back pressure in slips 80
psi, out slips 150 psi, PU Wt 105K, SO
Wt 80K, Monitoring well on pits #2 #3.
7/14/2019
7/14/2019
0.50
PROD1
CASING
RGRP
P
Service Top Drive, Blocks, Iron
6,536.0
6,536.0
20:30
21:00
Roughneck.
7/14/2019
7/14/2019
1.50
PROD1
CASING
STRP
P
Strip OOH from 6,536' MD to 4,852'
6,536.0
4,852.0
21:00
22:30
MD per stripping schedule,
maintaining back pressure with MPD
chokes and Pump #1 on backside, 3.5
bpm, MPD back pressure in slips 80
psi, out slips 150 psi, PU W1 96K, SO
Wt 75K, Monitoring well on pits #2 #3.
7/14/2019
7/15/2019
1.50
PRODi
CASING
PULD
P
Pick Up and RIH18 joints of HWDP,
4,852.0
4,852.0
22:30
00:00
rack back same (pipe management in
derrick) for Liner run drill pipe string.
Losses for day 180 BBLs.
7/15/2019
7/15/2019
3.50
PRODt
CASING
STRIP
P
Strip OOH from 4,852' MD to 835' MD
4,852.0
835-0-
00:00
03:30
per stripping schedule, maintaining
back pressure with MPD chokes and
Pump #1 on backside, 3.5 bpm, MPD
back pressure in slips 80 psi, out slips
150 psi, Monitoring well on pits #2 #3.
7/15/2019
7/15/2019
5.00
PROD1
CASING
OWFF
P
OWFF.
835.0
835.0
03:30
08:30
Initial flow back rate 7.1 bbis/hr.
After 1 hr: 2.6 bbis/hr
After 2 hr: 1.3 bbis/hr
After 3 In: 0.63 bbls/hr
After 4 hr: 0.28 bbis/hr
After 5 hr. 0.28 bbls/hr
Confer with town, OK to proceed
ahead.
7/15/2019
7/15/2019
1.00
PROD1
CASING
MPDA
P
Pull MPD RCD bearing and install
835.0
835.0
08:30
09:30
MPD trip nipple.
7/15/2019
7/15/2019
0.50
PROD1
CASING
TRIP
P
TOOH racking back DP in derrick.
835.0
385.0
09:30
10:00
Monitor well on Trip Tank. PU Wt 60k,
SO Wt 46k.
7/15/2019
7/15/2019
3.25
PRODi
CASING
PULD
P
Lay Down BHA #5 per SLB DD Rep.
385.0
0.0
10:00
13:15
Rack Back 2 stands of 4" HWDP from
BHA in derrick.
7/15/2019
7/15/2019
1.75
COMPZI
WHDBOP
RURD
P
Pull wear ring (6.875" ID) and install
0.0
0.0
13:15
15:00
test plug per FMC Rep.
SIMOPS: Rig Up for BOPE Test.
Page 34158 ReportPrinted: 811212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Deem
Start Time
End Time
Dur inn
Prime,
Op Code
Activity Code
Time P -T -x
Operation
(MB)
End Depth(RKB)
7/15/2019
7/15/2019
4.50
COMPZI
WHDBOP
BOPE
P
BOPE test:Test all BOPE equipment
0.0
0.0
1500
19:30
250 Low / 3,500 High 5 min each. (All
test charted and All test Passed). 4"
and 4.5" test joints used on all rams
and annular preventer Test Annular
preveri 2-7/8 x 5-1/2" VBRs in
UPR and LPR, Chokes Valves 1-15,
Manual and Super Choke, Choke and
HCR manual and HCRs, 4" valve on
kill line, 4" FOSV, 4" Dart, Upper and
Lower IBOP. Manual and Super
Choke tested to 2,000 psi for bleed
and hold pressure.Koomey drawdown
test, Accumulator 2975 psi, manifold
1500 psi, acummulator 1700 psi after
all functions, 14 sec for 200 psi build
(2 elec Pumps, 62 sec for full build (2
elec pumps and 2 air pumps. 6
Nitrogen bottle Averagel950 psi.
Closing times: Annular 23 sec, UPR
21 sec, Blind/Shear Rams 16 sec,
LPR 17 sec, Choke HCR 2 sec, Kill
HCR 2 sec. Test Pit and Trip tank
gain/loss alarms, Flow Out high Alarm,
Test H2S alarms. Witness waived by
AOGCC Representative Jeff Jones
7/11/19, 11:30,
7/15/2019
7/15/2019
0.75
COMPZI
WHDBOP
RURD
P
Pull Test Plug and set wear ring
0.0
0.0
19:30
20:15
(6.875" ID) per FMC Rep.
7/15/2019
7/15/2019
1.75
COMPZI
CASING
RURD
P
Rig Up Casing Tongs, Elevators,
0.0
0.0
20:15
22:00
Running Equipment, Rig Floor and
Pipe/Casing Shed for running 4.5"
Liner Lower Completion.
7/15/2019
7/15/2019
0.50
COMPZI
CASING
SFTY
P
PJSM on Running 4.5"' Liner Lower
0.0
0.0
2200
2230
completion. Discussion included Llne
of Fire and Exclusion zones on rig
floor and in pipe/casing sheds.
7/15/2019
7/16/2019
1.50
COMPZI
CASING
PULD
P
Pick Up and Run in Hale with 4.5" liner
0.0
450.0
2230
0000
lower completion.
7/16/2019
7/16/2019
6.00
COMPZI
CASING
PULD
P
Continue to run in hole from with 4.5"
450.0
3,675.0
0000
0600
Liner 12.6# L80 HYD563 as per
engineering detail from 450' to 3,675'
MD. Pick up weight - 77k, Down
weight - 76k while monitoring fluid
displacement in pit #3 with constant
hole fill.
7/16/2019
7/16/2019
6.00
COMPZI
CASING
PULD
P
Continued to run in hole with 4.5" liner
3,675.0
8,740.0
0600
1200
as per engineering detail from 3,675'
to 8,740' MD. Pick up weight - 98k,
Down weight - 77k while monitoring
fluid displacement in pit #3 with
constant hole fill. Fluid loss over last
12 hrs. - 29 bbls.
7/16/2019
7/16/2019
6.50
COMPZt
CASING
PULD
P
Continued to run hole with 4.5' liner as
8,740.0
14,298.0
12:00
18:30
per engineering detail from 8,740'to
14,298' MD. Pick up weight - 126k,
Down weight - 102k while monitoring
fluid displacement in pit #3 with
constant hole fill.
Page 35/58 Report Printed: 8/12/2019
a , Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Depth
Stan Time
End Time
our (hr)
Phase
Op Code
AcdAy Cade
Time P -T -X
Operatlon
(AKB)
End Depth (fixe)
7/16/2019
7/16/2019
3.00
COMPZI
CASING
PULD
P
Made up X -over atop of 4.5" liner,
14,298.0
14,298.0
18:30
21:30
Joint # 353 Q 14,298' MD.
Torque / Drag data points:
> Static pipe, No pumps, Rotation, or
Reciprocation; Tq-71k; PU-157k; DW -
99k.
> At 1 bpm and 10 rpm: Tq-8.0k; PU-
145k; DW -99k
> At 2 bpm and 20 rpm: Tq-7.8k; PU-
130k; DW -119k
> At 3 bpm and 30 rpm: Tq-7.0k; PU-
149k; DW -118k
> Total pumped 375bbis/3918 strokes
> Total fluid loss -10 bbl/hr.
7/16/2019
7/17/2019
2.50
COMPZI
CASING
PULD
P
Continued to run in hole with 4.5" liner
14,298.0
16,714.0
21:30
00:00
as per engineering detail from 14,298'
to 16,714' MD. Pick up weight — 160k,
Down weight — 100k while monitoring
fluid displacement in pit #3. Continued
with constant hole fill.
7/17/2019
7/17/2019
3.50
COMPZI
CASING
PUTB
P
Continued to RIH with 4.5" Liner from
16,714.0
17,207.0
00:00
03:30
16,714'to 17,207'MD. Pick up weight
— 160k, Down weight — 100k while
monitoring fluid displacement in pit #3
with constant hole fill. Made up 4.5"
liner running tool assembly as per
Baker Rep.
7/17/2019
7/17/2019
0.50
COMPZI
CASING
TRIP
P
TIH on DP from 17,207'to 17,460'
17,207.0
17,460.0
03:30
04:00
MD. Staged pumps up from 1 bpm at
97 -psi to 2 bpm at -148 psi and finally,
3 bpm at 246 -psi for torque and drag
reference points.
At 3 bpm without rotation:
> Pick up weight -158k
> Down Weight -99k
At 3 bpm with rotation at 30 rpms:
> Pick up weight— Stalled at 8k fl/lbs.
torque.
> Down weight— 124 with 7k flU bs.
torque.
7/17/2019
7/17/2019
2.00
COMPZI
CASING
TRIP
P
Continued to TIH the 4.5" liner on DP
17,460.0
20,820.0
04:00
06:00
from 17,460' to 20,820' MD. Down
weight -84k while monitoring fluid
displacement in pit #3 with constant
hole fill.
7/17/2019
7/17/2019
6.00
COMPZI
CASING
TRIP
P
Continued to TIH the 4.5" liner on DP
20,820.0
28,840.0
06:00
12:00
from 20,820 to 28,840' MD. Down
weight -84k while monitoring fluid
displacement in pit #3 with constant
hole fill. Fluid loss over the last 12 hrs.
— 12 bbls. OA press. 0.0 psi.
7/17/2019
7/17/2019
3.00
COMPZI
CASING
TRIP
P
Continued to TIH with 4.5" liner from
28,840.0
31,468.0
12:00
15:00
28,840'to 31,468' MD. Down weight -
98k while monitoring fluid
displacement on pit #3 with constant
hole fill.
Page 36158 ReportPrinted: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Sten Time
End Time
our (hr)
Phase
Op Code
AdhVity Code
Time P -T -X
Opendion
(ftKB)
End Depth (MB)
7/17/2019
7/17/2019
1.75
COMPZ1
CASING
TRIP
P
Obtained setting parameters: Pick up
31,468.0
31,468.0
15:00
16:45
weight- 229k, down weight- 94k,
established circulation at 3 bpm and
740 psi. Shut down pumps and
dropped 1.625" ball, pumped down at
3 bpm at 660-740 psi for 1000 strokes,
slowed pumps down 1 bpm from 170-
100 psi. Ball on seat at 1105 strokes,
pressure increased to 2,300 psi.
Released liner hanger and set ZXP
packer per Baker Rep. Pressured up
to 4,290 psi bled off and set down on
hanger with dog sub. Confirmed with
no rotation, and again with rotation at
15 rpm, Bk ft/lbs. confirmed top of liner
set at 14,200' MD.
7/17/2019
7/17/2019
0.50
COMPZ1
CASING
PRTS
P
Rigged up and pressure tested liner to
31,468.0
31,468.0
16:45
17:15
2,500 psi for 10 -min. Test good and
charted.
7/17/2019
7/17/2019
2.75
COMPZ1
WELLPR
CIRC
P
Racked back two Stands and
31,468.0
31,468.0
17:15
20:00
circulated Bottoms up staging pumps
to 5 bpm at 612 psi. Total strokes
pumped 5,876. Final circulation at 800
psi with 8% flow back with max Gas at
1,288 units.
7/17/2019
7/17/2019
0.75
COMPZ1
WELLPR
OWFF
P
Observed well for flow—well static
31,468.0
31,468.0
20:00
20:45
7/17/2019
7/17/2019
1.25
COMPZ1
WELLPR
PULD
P
Trip out of hole from 14, 100' to 13,130'
14,100.0
13,130.0
20:45
22:00
MD laying down 6 -stands of HWDP
while monitoring fluid loss and filling
over hole.
7/17/2019
7/17/2019
0.50
COMPZ1
WELLPR
SVRG
P
Serviced Top Drive and blocks.
13,130.0
13,130.0
22:00
22:30
7/17/2019
7/18/2019
1.50
COMPZ1
WELLPR
TRIP
P
Continue to trip out of hole from
13,130.0
11,995.0
22:30
00:00
13,130'to 11,995' MD. Pick up weight -
161k while monitoring fluid
displacement in pit #3 with constant
hole fill. Flow out 8%. Observed fluid
loss for the last 12 hrs. 10 bbls. OA
pressure - 0.0 psi
7/18/2019
7/18/2019
6.00
COMPZ1
WELLPR
TRIP
P
Continue to trip out of hole from
11,995.0
484.0
00:00
06:00
11,995'to 484' MD. Pick up weight -
50k while monitoring fluid
displacement in pit #3 with constant
hole fill. Flow out 10%.
7/18/2019
7/18/2019
1.25
COMPZ1
WELLPR
TRIP
P
Continued to trip out of hole from 484'
484.0
50.0
06:00
07:15
to 50' MD, pick up weight 47k,
continued to monitor fluid loss in pit #3
while filling over hole.
7/18/2019
7/18/2019
0.75
COMPZ1
WELLPR
BHAH
P
Laid down liner running tools per
50.0
0.0
07:15
08:00
Baker rep. Pick up weight 44k.
Inspected dog sub, verified ZXP
packer set — confirmed by Baker and
COP rep. Cleared and cleaned rig
floor.
7/18/2019
7/18/2019
1.50
COMPZ1
WELLPR
SVRG
P
Slip and cut drill line, serviced and re-
0.0
0.0
08:00
09:30
calibrated top drive and blocks.
Continued to monitor well bore fluid in
pit #3 with constant hole fill.
7/18/2019
7/18/2019
2.00
PROD2
WHPST
BHAH
P
Clean and cleared rig floor, moved
0.0
0.0
09:30
11:30
whipstock BHA tolling to rig floor as
per Baker Rep.
Page 37158 Report Printed: 8112120191
e Operations Summary (with Timelog Depths)
C D5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
start Time
End Time
our (hr)
Phase
Op code
Ac vily code
Time P.T.X
Operation
ms)
End Depth (Wfi)
7/18/2019
7/18/2019
0.50
PROD2
WHPST
BHAH
P
Made up Whipstock BHA as per
0.0
120.0
11:30
12:00
Baker / BLB reps. from surface to 120'
MD. Pick up weight 55k, down weight
54k. Continued to monitor well bore
fluid in pit #3 while filling over hole.
Total fluid loss for past 12 hrs. 5 blots,
OA pressure 0.0 psi.
7/18/2019
7/18/2019
1.25
PROD2
WHPST
BHAH
P
Continued to make up whipstock BHA
120.0
229.0
12:00
13:15
as per Baker / SLB reps. Orient MWD
with Whipstock from 120.0' to 229.0'
MD. Pick up weight 55k, down weight
54k while monitoring well bore fluid in
pit #3. Continued to fill over hole.
7/18/2019
7/18/2019
4.75
PROD2
WHPST
TRIP
P
Tripped whipstock BHA/Milt assembly
229.0
7,800.0
13:15
18:00
on 4.0" DP from 229'to 7,800' MD.
Pick up weight 103k down weight 81 k
while monitoring fluid displacement in
pit #3. Continued to fill pipe every 20
stands. Shallow hole test at 2000' with
MWD at 225 GPM and 600 psi.
Communications verified. Flow out at
11%.
7/18/2019
7/18/2019
4.00
PROD2
WHPST
TRIP
P
Continued to trip in hole with
7,800.0
13,991.0
1800
2200
whipstocklmill assembly from 7,800'to
13,991' MD. Logged RATag at
13,884.5'MD Pick up weight 177k
down weight 130k while monitoring
fluid displacement in pit #3 with
constant pipe fill every 20 stands. 225
GPM, at 600 psi with 11 % flow out.
7/18/2019
7/19/2019
2.00
PROD2
WHPST
WPST
P
Logged while tripping in hole from
13,991.0
14,098.0
22:00
00:00
13,991'to 14,098' MD, attempted to
orient whipstock at 45 degrees High
right, worked pipe, fell outside
allowable 45-50 set degree, received
variance from COP engineering to set
at 40-55 degrees high right.
7/19/2019
7/19/2019
1.25
PROD2
WHPST
OWFF
P
Observed well for flow prior to
14,098.0
14,098.0
00:00
01:15
stabbing seal assembly. Well Static.
7/19/2019
7/19/2019
1.00
PROD2
WHPST
WPST
P
Picked up stand #148, dropped
14,098.0
14,134.0
01:15
02:15
bottom single, tagged no-go at 14,205'
MD slacked off 7k, set anchor at 15k,
picked up 10k over -pull to confirm set,
set confirmed. Set down at 38k,
sheared bolt off slide, picked up to
confirm shear, shear successful. Top
of Whipstock set 14,120' MD, Bottom
of Whipstock 14,134' MD. Final set
parameters, 45' high right as per
schedule.
7119/2019
7/19/2019
0.75
PROD2
WHPST
PRTS
P
Rigged up to lest seal assembly,
14,134.0
14,134.0
02:15
03:00
closed annular, opened kill, pressured
up to 1100 psi and held 10 -min, and
pumped 44 strokes total. Test good.
Rigged down test equipment.
Pressure test recorded and charted.
7/19/2019
7/19/2019
0.50
PROD2
WHPST
WPST
P
Obtained milling parameters without
14,134.0
14,120.0
03.00
03:30
pumps; pick up weight 170k, down
weight 133k. Pumps on at 275 gpm
with 1,505 psi and 13% flow out; Pick
up weight 166k, Down weight 132k,
rotating weight 15k with 5,000 fUlbs.
Tagged window at 14,120' MD.
Page 38158 Report Printed: 811212019
seddlil
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Time
End Time
Dur (no
Phase
Op code
Activity Code
Time P -T -X
O p ,ration
nt(ftKB)De
Start Depth
EM Depth (flKB)
7/19/2019
7/19/2019
8.50
PROD2
WHPST
WPST
P
Milled window as BOT Rep and
14,120.0
14,140.0
03:30
12:00
schedule from 14,120'to 14,140' MD
at 275 gpm and 1,527 psi. rotating
between 60-100 rpms with 5-11,000
ft/lbs. torque and 13% flow out.
Pumped High-Visc sweep at 14, 125'
MD and again at 14,133' MD. Total
fluid loss last 12hrs. 0.0 bola, O.A.
pressure 10.0 psi.
7/19/2019
7/19/2019
1.50
PROD2
WHPST
WPST
P
Continued to mill as per BOT and
14,140.0
14,148.0
12:00
1330
milling schedule from 14,140'to
14,148' at 275 gpm with 1,527 psi.
rotating at 100 rpms between 5 and
11,000 it/lbs torque. 13% flow out,
Rotating weight 150k, again pumping
a High-Visc sweep at 14,143' MD.
7/19/2019
7/19/2019
1.00
PROD2
WHPST
WPST
P
Dressed window as per BOT rep from
14,148.0
14,129.0
13:30
14:30
14,148'to 14,129' MD at 100 rpms
with torque running between 4 and
8,000 ft/lbs. while pumping 275 gpm at
1,435 psi moving through the window
with three passes. With pumps off and
no rotation, pass through window
without issue. Window deemed
cleaned and polished. Pick up weight
178k down weight 131k.
7/19/2019
7/19/2019
1.50
PROD2
WHPST
TRIP
P
TOOH, broke double #148 from string
14,129.0
14,010.0
14:30
16:00
and picked up signal in mouse hole
and racked back in derrick. Circulated
bottoms up above Whipstock from
14,110'to 14,010' MD at 275 gpm and
1,340 psi. Pick up weight 177k down
weight 131 k. Total strokes pumped
4,628.
7/19/2019
7/19/2019
0.50
PROD2
WHPST
OWFF
P
Observed well for flow - Well Static.
14,010.0
14,010.0
16:00
16:30
7/19/2019
7/20/2019
7.50
PROD2
WHPST
TRIP
P
Tripped out of hole from 14,010'to
14,010.0
146.0
16:30
00:00
13,924' MD on elevators. Pick up
weight 178k down weight 130k. With
pumps on at 275 GPM and 1,345 psi
at 150 ft per hr. logged RATag for final
confirmation, continued to pull out of
hole, confirmed RA tag at 13,884.5'
MD. SLB Logged placed in well file.
Continued to trip put of hole from 12,
785' to 146' MD while filling over hole
and monitoring fluid loss in Pit #2.
Held PJSM for laying down Baker
BHA. Total losses over last 12 his. -
15.1 bbls. O.A. pressure 10 psi
7/20/2019
7/20/2019
2.50
PROD2
WHPST
BHAH
P
Laid down Baker milling BHA as per
146.0
0.0
00:00
02:30
Rep. Cleaned magnets, and managed
tools going back in hole with SLB
BHA. Manually strapped pits before
and after BHA removal. Cleared and
cleaned rig floor.
7/20/2019
7/20/2019
0.50
PROD2
WHPST
SVRG
P
Rigged up wash tool and RIH to clean
0.0
0.0
02:30
03:00
BOP'S. Reciprocated pipe with pumps
on from top of Tubing spool to the top
of annular. Serviced blocks, Top Drive,
and ST80.
Page 39/58 ReportPrinted: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stall Depth
Stall Tim
End rime
Dur (no
Phase
Op GDde
Adfty Code
Time P-T-X
Operation
(WS)
End Depth (flKB)
7/20/2019
7/20/2019
2.00
PROD2
WHPST
BHAH
P
Performed PJSM with SLB for picking
0.0
734.4
03:00
05:00
up BHA. Made up drilling motor and
BHA as per approved detail. Scribed
motor as per SLB D/D. Reset Totco
depth to 734.4' MD. Continue to flow
over hole while monitoring fluid returns
in pit 2.
7/20/2019
7/20/2019
1.00
PROD2
WHPST
TRIP
P
Tripped in hole on elevators from 734'
734.4
2,351.0
05:00
06:00
to 2,351' MD while monitoring fluid
displacement in pit 2. Manually
strapped every 5 stands. Performed
shallow MWD test at 1,500' while
pumping 222 gpm with 715 psi. Pick
up weight 75k, down weight 69k at
1,500' MD.
7120/2019
7/20/2019
6.00
PROD2
WHPST
TRIP
P
Continued to trip in hole from 2,351' to
2,351.0
12,880.0
06:00
12:00
12,880' MD while monitoring fluid
displacement in pit 2 with constant
hole fill. Continued to strap every 5-
stands, and filling pipe every 20. Pick
up weight 152k, down weight 112k.
Total fluid loss f/last 12-hrs. 0 bbls.
O.A. pressure 0.0 psi.
7/20/2019
7/20/2019
0.50
PROD2
WHPST
TRIP7'—
Continued to trip in hole from 12,880'
12,880.0
13,755.0
12:00
12:30
to 13,755' MD while monitoring fluid
displacement in pit 2. Continued hole
fill and manually strapping every 5-
stands and filling pipe every 20. Pick
up weight 1523k down weight 112k.
7/20/2019
7/20/2019
1.00
PROD2
WHPST
TRIP
P
Picked up stand #142 and tripped in
13,755.0
13,884.0
12:30
13:30
hole with 250 gpm at 1,510 psi and
logged RA tag. Tagged RA at 13, 884'
MD as per MWD. Reset bit
depth/confirmed with MWD. Orient
motor as per SLB rep. Pick up weight
155k down weight 130k, pick up
weight 152k down weight 112k.
7/20/2019
7/20/2019
4.50
PROD2
WHPST
DRLG
P
Continued to RIH to 14,148' and
13,884.0
14.175.0
13:30
18:00
started control drilling to 14,175' MD at
7,444 TVD at 270 gpm and 1,750 psi
with 14% flow out. 5-12k weight on bit,
Pick up weight 155k down weight
130k rotational 125k, and 4-8k Polbs.
torque. Controlled drilling from 14,175'
to 14,198' MD at 60 rpms 8k ft/lbs.
Continued to monitor fluid
displacement in pit 2 and calling out
tossestgains every 5 stands. Actual
Slide Time - 1.64 /Actual Drilling Time
-2.01 /Actual Bit Time -2.01 /Actual
Jar Time -133.43
7/20/2019
7/20/2019
5.50
PROD2
WHPST
DRLG
P
Continued to control drill 6.5" kick-off
14,175.0
14,323.0
18:00
23:30
as per SLB rep from 14,175'to 14,323'
MD, 7,459' TVD at 270 gpm at 1,750
psi. 10 to 20klbs weight on bit with
14% flow out. Pick weight 180k down
weight 135k. Rotation weight 147k,
and 4-8k ft/Ibs. torque. Took MWD
survey as per SLB, verified position.
Separation parameters: 8.3' center to
center at 14,275' MD; 12.3' center to
center at 14,323' MD. total length
drilled from kick-off - 175'. Picked up
off bottom and OWFF for 10-min. Well
Static. Actual Slide Time-2.891
Actual Drilling time-4.11 /Total bit
hours —6.12 / Total jar hours — 137.54.
Page 40158
Report Printed: 81121'2019
Operations Summary (with Timelog Depths)
AM
C D5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
Eml Time
Our(hr)
Phase
Op Code
Advity Code
Time P -T -X
Operation
(ftKB)
Ertl Depth(ftKB)
7/20/2019
7/21/2019
0.50
PROD2
WHPST
TRIP
P
Picked up off bottom on elevators from
14,323.0
14,040.0
2330
00:00
14,323' to 14,040' MD and monitored
hole fill in pit #2. Pick up weight -
180k down weight— 135k. Continued
to pull out of hole and through window
without rotation. Observed slight
overpull between 3-5k on blocks. O.A.
pressure at 21:00 — 220 psi / fluid loss
over last 12hrs — 0.0 bbls.
7/21/2019
7/21/2019
6.00
PROD2
WHPST
TRIP
P
Continued to trip out of hole from
14,040.0
2,000.0
0000
06:00
14,404'to 2,000' MD while monitoring
hole fill and fluid displacement in pit
#2. Continued to manually strap every
5 -stands, continue to cull DP for bent
and damaged wear bands. Laid down
4-Jts. Pick up weight 90k down weight
85k at 2,000' MD.
7/21/2019
7/21/2019
1.00
PROD2
WHPST
TRIP
P
Continued top trip out of hole from
2,000.0
360.0
06:00
07:00
2,000' to 360' MD while monitoring
hole over and fluid displacement in pit
#2. continued to manually strap every
5-syands. Pick up weight 60k down
weight 45k.
7/21/2019
7/21/2019
0.25
PROD2
WHPST
OWFF
P
Observed well for flow for 15 -min. Well
360.0
360.0
07:00
07:15
Static
7/21/2019
7/21/2019
2.00
PROD2
WHPST
BHAH
P
Laid down BHA#7 as per SLB rep.
360.0
0.0
07:15
09:15
Cleaned magnets and continued to lay
clown assembly.
7/21/2019
7/21/2019
1.50
PROD2
WHPST
CLEN
P
Cleared, and clean rig floor pulled
0.0
0.0
09:15
10:45
wear bushing and installed BOP test
plug.
7/21/2019
7/21/2019
4.25
PROD2
WHDBOP
BOPE
P
Tested BOPE equipment 250 Low/
0.0
0.0
10:45
15:00
3,500 High 5 min each. (All tests
passed and charted with first time
pass rate.) Tests were conducted
using both the 4.0" and 4.5" on all
rams and annular preventer. Tested
annular and the 2-7/8 x 5-1/2" VBRs in
UPR and LPR, Chokes Valves 1-15,
Manual and Super Choke, Choke and
HCR manual and HCRs, 4" valve on
kill line, 4" FOSV, 4" Dart, Upper and
Lower IBOP. Manual and Super
Choke tested to 2,000 psi for bleed
and hold pressure. Koomey drawdown
test, accumulator 3000 psi, manifold
1500 psi. Post functioning the
accumulators read 1700 psi with 18 -
seconds for 200 psi build (2 electric
pumps, 88 sec for full build both
electric pumps and 2 air pumps. 6
Nitrogen bottle Average 1950 psi.
Closing times: Annular 23 -seconds,
UPR 21 -seconds, Blind/Shear Rams
16 -seconds, LPR 17 -seconds, Choke
HCR 2 -seconds, Kill HCR 2 -seconds.
Test Pit and Trip tank gain/loss alarms,
Flow Out high Alarm, Tested H2S/CO2
alarms without issue. Witness waived
by AOGCC Representative Matt
Hererra 7/20/2019 at 12:50.
Page 41/58 Report Printed: 811212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Depth
Start Time
End Time
Wr(hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
dtKB)
End Depth ptKB)
7/21/2019
7/21/2019
1.75
PROD2
WHDBOP
BOPE
P
Rigged down BOPE test equipment,
0.0
0.0
15:00
16:45
pulled test plug and installed wear
bushing as per FMC rep. W/B I. D. 6-
875". Removed master bushings in
rotary and installed PS -21 slips,
prepared rig floor BHA #8
7121/2019
7/21/2019
1.25
PROD2
DRILL
BHAH
P
Performed PJSM for BHA handling.
0.0
148.0
16:45
18:00
Picked up SLB BHA #8 as per detail
from to 146' MD. Monitored hole 811 on
pit 3. Pick up weight 50k down weight
48k
7/21/2019
7/21/2019
1.25
PROD2
DRILL
BHAH
P
Continued to PU BHA#8 from 148' to
148.0
343.0
1800
19:15
343' MD Tripped in hole with HWDP.
Changed over to PS -21 pipe slip
assembly
7/21/2019
7/22/2019
4.75
PROD2
DRILL
TRIP
P
Tripped in hole on elevators from 343'
343.0
9,370.6-
,370.019:15
19 15
00:00
to 1,500' MD while monitoring fluid
displacement in pit #3. Pick up weight
55k down weight 52k at 400' MD.
Performed MWD shallow hole test as
per SLB DID. Pumped at 240 gpm
with 1,010 psi. Tool communication
verified. Continued to TIH from 1,500'
to 9,370' MD while displacing pipe
every 20 stands with 9.0 ppg FloPro.
Continued to manually strap returns
every 5 -stands.
7/22/2019
7/22/2019
3.00
PROD2
DRILL
TRIP
P
Continued to trip in hole on elevators
9,370.0
13,836.0
00:00
03:00
from 9,370' MD to 13,836' MD filling
pipe every 20 stands with 9.0 ppg
FloPro. Continued to strap fluid
displacement every 5 -stands.
7122/2019
7/22/2019
1.00
PROD2
DRILL
MPDA
P
Performed PJSM with MPD rep for
13,836.0
13,836.0
03:00
04:00
installation of RCD bearing. OWFF for
10 -min, Well Static. Removed trip
nipple, installed bearing. Observed 7k
drag while pushing DP through new
bearing.
7122/2019
7/22/2019
1.00
PROD2
DRILL
SVRG
P
Performed PJSM for hanging blocks
13,836.0
13,836.0
04:00
05:00
and slip/cut drill line. Slipped and cut
110' of line, cleaned and cleared tools,
disregarded old line, and calibrated
blocks in Amphion.
7/22/2019
7/22/2019
1.00
PROD2
DRILL
TRIP
P
Continued to trip in hole on elevators.
13,836.0
14,026.6-
05:00
06:00
Picked up stand #144, logged RA tag
as per SLB DID Rep. Pumped 245
gpm with 1,935 psi. Pick up weight
187k down weight 119k. RA survey
confirmed 13, 884' MD. Continued to
trip in hole through window,
experienced no drag, shot survey.
7/22/2019
7/22/2019
1.00
PROD2
DRILL
TRIP
P
Washed and reamed from 14,026' to
14,026.0
14,323.0
06:00
0700
14,323' MD while rotating at 40 rpms,
6k fl/lbs. torque, at 245 gpm with
1,905 psi. Experienced 7% flow out.
Began displacing well from 9.7 Brine
with 9.0 FloPro as per schedule.
Page 42/58 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
CDS-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Depth
Slav rime
End Time
Our (hr)
Phase
Op Corte
Activity Code
Time P-T-X
Opera lon
(ftKB)
End Depth (flKB)
7/22/2019
7/22/2019
5.00
PROD2
DRILL
DDRL
P
Began drilling 6.5" production hole
14,323.0
14,826.0
07:00
12:00
from 14,323'to 14,826' MD, TVD
7,433' with 15k weight on bit, 257 gpm
at 2,110 psi on, 950 psi off. 150 rpms
torque on 8k ft/lbs., off 7k FtAbs. with a
7% flow out. Pick up weight 192k,
down weight 112k, and rotating weight
137k. Actual drilling time 4.12 hrs. /
Total bit hrs. 5.99 / total jar hrs.
141.66. Completed displacement to
9.0 ppg FloPro @ 07:45, Total strokes
pumped 4,385. (SPR @ 14,404' MD,
7,487' TVD: (MP-1 20/30 SPM =
420/660 psi) / (MP-2 20/30 SPM =
460/680 psi))
7/22/2019
7/22/2019
4.50
PROD2
DRILL
DDRL
P
Continued to drill 6.5" production hole
14,826.0
15,047.0
12:00
16:30
from 14,826'to 15,047' MD, 7,531'
TVD. Weight on bit from 14-20k lbs. at
257 gpm with 2,050 psi on, 2,095 psi
off. 120 rpms torque on 13k ft/lbs.,
torque off 81k ft/Ibs. with 11% flow out.
Pick up weight 196k down weight 115k
rotating weight 141k. actual drilling
time 3.5 hrs. Total bit hrs. 7.68, Total
jar hrs. 144.78.
7/22/2019
7/22/2019
1.50
PROD2
DRILL
CIRC
T
Rotated and reciprocated from 15,047'
15,047.0
14,970.0
1630
18:00
to 14,970' MD, troubleshot MWD tools
as per SLB. Rotating between 30-160
rpms, 6-11 k ft/lbs. and pumping
between 225-257 gpm with 1,690 to
2,110 psi. Observed 12% flow out.
7/22/2019
7/22/2019
2.50
PROD2
DRILL
CIRC
T
Continued to troubleshoot MWD from
14,970.0
14,970.0
1800
20:30
14,970'to 14,882' MD. Performed
multiple downlinks established
communication and performed test as
per SLB rep. Reamed back to bottom
and continued drilling forward from
15,047' MD.
7/22/2019
7/23/2019
3.50
PROD2
DRILL
DDRL
P
Continue to drill from 15,047 to
15,047.0
15,720.0
20:30
00:00
15,720' MD at 7,439' TVD. Weight on
bit 14-20klbs, with 255 GPM and
2,260 psi on and 2,180 psi off.
Rotating at 130 rpms with 12kft/Ibs.
torque on and 8kfl/lbs. torque off.
Observed flow out at 11%. Pick up
weight 191 k down weight 118k and
rotating weight at 148k. Actual drilling
time 3.74, Total bit hrs. 11.02, Total Jar
Hrs. 148.56. O.A. Pressure at 23:00
was recorded at 320 psi, Fluid losses
from the last hrs. 0.0 bbls.
7/23/2019
7/23/2019
5.50
PROD2
DRILL
DDRL
P
Continue to drill from 15,720'to
15,720.0
16,506.0
00:00
05:30
16,506' MD at 7,436' TVD. Weight on
bit 14-20klbs, with 245 GPM and
2,240 psi on and 2,195 psi off.
Rotating at 120 rpms with 11 kft/lbs.
torque on and 8kft/Ibs. torque off.
Observed flow out at 11%. Pick up
weight 198k down weight 117k and
rotating weight at 156k. Actual drilling
time 4.25, Total b8 hrs. 15.27, Total Jar
Hrs. 152.81.
7/23/2019
7/23/2019
0.50
PROD2
DRILL
SVRG
P
Serviced rig, greased wash pipe,
16,506.0
16,506.0
05:30
06:00
1
I
I
greased and serviced the PS-21 slips,
inspected hydraulic hoses
Page 43158 ReportPrinted: 8/1212019
e Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
smn Depm
Stan Time
End Time
Our (hr)
Phase
Op Code
AddvM Code
Time PJA
Operation
(ftKB)
End Depth (WB)
7/23/2019
7/23/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 16,506' to
16,506.0
17,349.0
0600
12:00
17,349' MD, 7,446' TVD. Weight on bit
14-20kfl/Ibs. at 245 GPM and 2,447
on and 2,195 psi off. Rotating at 150
rpms with 11 kft/lbs torque on and
8kff/lbs torque off. Observed flow out
at 11%. Pick up weight 198k down
weight 117k and rotating weight 1561k.
Actual drilling time 4.02 hrs. Total bit
hrs. 21.08, Total Jar time 156.75 hrs.
> SPR's at 16,683' MD; FloPro — 9.1
ppg
MP #1- 30/40 SPM — 940 / 1,240 psi
MP #2 - 30/40 SPM — 920 / 1,160 psi
O.A. Pressure 360 psi / Losses over
last 12hrs. — 0.0 bbls.
7/23/2019
7/23/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 17,349'to
17,349.0
17,690.0
12:00
18:00
17,690' MD, 7,545' TVD. Weight on bit
14-20kf tlbs. at 255 GPM and 2,705
on and 2,695 psi off. Rotating at 150
rpms with 12kf tlbs torque on and
8kft/Ibs torque off. Observed flow out
at 11%. Pick up weight 195k down
weight 108k and rotating weight 143k.
Actual drilling time 1.42 hrs. Total bit
hrs. 22.05, Total Jar time 158.17 hrs.
7/23/2019
7/24/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 17,690'to
17,690.0
18,197.0
18:00
00:00
18,197' MD 7,477' TVD. Weight on bit
14-20kft/Ibs at 255 GPM and 2,515 psi
on and 2,690 psi off. Rotating at 120 —
150 rpms with 10-12kft/Ibs torque on
and 7kft/lbs torque off. Observed flow
out at 11 %. Pick up weight 193k down
weight 106k, rotating weight 146k.
Actual drilling time 4.14 hrs. Actual bit
hrs. 28.66, Actual Jar time 164.33 hrs.
O.A pressure at 22:30 560 psi
Fluid loss over last 12hrs 11 WIS.
> SPR's at 17,539' MD; FloPro-9.0
ppg
MP #1- 30/40 SPM — 1,160 11,400 psi
MP #2 - 30/40 SPM — 1,100 / 1,460
psi
7/24/2019
7/24/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 18,197'to
18,197.0
18,798.0
00:00
06:00
18,798' MD, 7,475' TVD. Weight on bit
14-20k/lbs at 245 gpm with 2,710 psi
on and 2,651 psi off. Rotating at 150
rpms with 12kff/Ibs torque on and
8kft/Ibs torque off. Observed 11 % flow
out. Pick up weight 1951k Down weight
96k, rotating weight 140k. Actual
drilling time 4.41 hrs. Actual bit time
33.07 hrs. and total Jar time 168.74
hrs. Note: Crossed Fault E1 at 18,396'
MD without observing any significant
fluid losses or gains.
Page 44158 Report Printed: 811212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Deem
startTime
End Time
Our (hr)
Phase
Op Code
AdAty Code
Time P -T -X
Operation
(flKB)
End Depth (flKB)
7/24/2019
7/24/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 18,798'to
18,798.0
19,534.0
06:00
12:00
19,534' MD, 7,486' TVD. Weight on bit
18kllbs with 244 gpm and 2,753 psi on
and 2,698 psi off. Rotating at 150
rpms with 121iNlbs torque on and
8kft/Ibs torque off. Observed flow out
at 12%. Pick up weight 2021k down
weight 85k rotating weight 140k.
Actual drilling time 2.39 hrs. Total bit
time; 35.46 hrs. Total Jar time 168.74
hrs.
O.A Pressure at 07:00 — 500 psi. /
Total fluid losses for lastl2hrs. 208
bbls
> Time 04:20 SPR's at 18,583' MD,
7,478 TVD, MW — 9.0 FloPro
>> MP41 20 / 30— 1,12011,350 psi
>> MP42 20 / 30 — 1,160 / 1,360 psi
7/24/2019
7/24/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" from 19,534' to
19,534.0
20,247.0
1200
18:00
20,247' MD at 7,490' TVD. Weight on
bit 15k/lbs with 254 gpm at 2,831 psi
on and 2,796 psi off. Rotating at 150
rpms with 14kft/Ibs torque on and
8kft/lbs torque off. Observed 12% flow
out. Pick up weight 200k down weight
97k, rotating weight 139k. Actual
drilling time 4.31 hrs. Actual bit time
39.77 hrs. Total Jar time 177.31 hrs.
7/24/2019
7125/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 20,274'to
20,247.0
20,960.0
18:00
00:00
20,960' MD, 7,498' TVD. Weight on bit
15k/Ibs with 255 gpm and 2,880 psi on
and 2,750 psi off. Rotating at 150
rpms with 15k f flbs torque on and 8k
ft/lbs torque off. Observed 12% flow
out. Pick up weight 21 Ok down weight
87k rotating weight 140k. Actual
drilling time 3.92 hrs. Actual bit time
43.69 hrs. Total Jar time 181.23 hrs.
O.A Pressure at 23:30— 480 psi / Total
fluid losses for the last 12hrs. 480 bbls
> Time 13:30 / SPR's at 19,720' MD,
7,490 TVD, MW — 9.0 FloPro
>> MP41 30 140 — 1,380 / 1,600 psi
>> MP42 30 140 — 1,360 / 1,640 psi
> Time 23:301 SPR's at 19,720' MD,
7,490 TVD, MW — 9.0 FloPro
>> MP41 30 / 40 — 1,380 / 1,600 psi
>> MP42 30140 — 1,360 / 1,640 psi
7/25/2019
7125/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" from 20,960'to
20,960.0
21,720.0
00:00
06:00
21,720' MD at 7,492' TVD. Weight on
bit 15k/lbs with 255 gpm at 2,880 psi
on and 2,750 psi off. Rotating at 150
rpms with 15kft/lbs torque -on and
Bkff/lbs torque -off. Observed 12% flow
out. Pick up weight 210k/lbs down
weight NIA rotating weight 142k/lbs.
Actual drilling time 4.03 hrs. Actual bit
time 49.95. Total Jar time 185.26 hrs.
Page 45158 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Depth
Start Time
End Time
Dur (hr)
Phase
Op Code
Activity Code
Time P -T -X
Operation
(ftKB)
End Depm(ftKB)
7/25/2019
7/25/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" from 21,720'to
21,720.0
22,671.0
0600
12:00
22,671' MD at 7,481' TVD. Weight on
bit 19k/lbs with 244 gpm and 2,880 psi
on and 2,750 psi off. Rotating at 150
rpms with 19kftl/lbs torque -on and
10kft/lbs torque -off. Observed 12%
flow out. Pick up weight 218olbs,
down weight N/A, rotating weight
130k/lbs. Actual drilling time 3.88 hrs.
Actual bit time 51.60 hrs. Total jar time
189.14 his
> SPR's at 21,905' MD, 7,490 TVD
MW -9.0 ppg FloPro / Time: 07:30
>> MP #1 — 20/30 1,300 psi / 1,540
psi
>> MP #2 — 20/30 1,340 psi 11,540
psi
> Fluid Gain/Loss in last 12hrs. 0.0 /
161 bbls
> O.A. pressure: 500 psi.
7/25/2019
7/25/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" from 22,671'to
22,671.0
23,528.0
12.00
18:00
23,528' MD at 7,490 TVD. Weight on
bit 18k/lbs with 244 gpm at 2,880 psi
on and 2,750 psi off. Rotating at 150
rpms with 19kft/lbs torque on and
10kft/lbs torque off. Observed 12%
flow out. Pick up weight 218k down
weight N/A, rotating weight 130k.
Actual drilling time 3.73 hrs. Actual bit
time 57.20 hrs. Total Jar time 192.87
hrs.
7/25/2019
7/26/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" from 23,528'to
23,528.0
24,387.0
1800
0000
24,387' MD at 7,493' TVD. Weight on
bit 18k/lbs with 245 gpm at 2,970 psi
on and 2,960 psi off. Rotating at 150
rpms with 21 kf /lbs torque on and
12kft/lbs torque off. Observed 12%
flow out. Pick up weight 211k down
weight N/A, rotating weight 148k.
Actual drilling time 3.61 hrs. Actual bit
time 58.94 hrs. Total Jar time 196.48
hrs.
SPR's at 24,000' MD, 7,490 TVD MW -
9,1+ ppg FloPro / Time: 21:30
MP #1 — 20/30 1,120 psi/ 1,360 psi
MP #2 — 20/30 1,120 psi / 1,360 psi
Fluid Gain/Loss in last 12hrs. 0.0 / 104
bbls
O.A. pressure: 350 psi. at 23:00
7/26/2019
7/26/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" L1 from 24,387'
24,387.0
25,192.0
00:00
06:00
to 25,192' MD, 7,510' ND. Weight on
Bit 16k/lbs at 245 gpm with 3,245 psi
on and 3,035 psi off. Rotating at 120
rpms with 19kf /lbs torque on and
12kft/lbs off. Observed 12% flow out.
Pick up weight 218k down weight 0.0,
rotating weight 150k/lbs. Actual drilling
time 4.06 hrs. Total Bit time 64.87 hrs.
Total Jar time 200.54 hrs.
Page 46158 Report Printed: 8/12/2019
' Operations Summary (with Timelog Depths)
d
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan DePdl
Stan Time
End7xne
Da(hr)
Phase
op Code
A ily Code
Time P-T-X
operallm
(ftKB)
EM Depth(ftKB)
7/26/2019
7/26/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 25,192'to
25,192.0
25,682.0
06:00
12:00
25,682' MD, 7,538' TVD. Weight on Bit
17ulbs at 245 gpm with 2,960 psi on
and 2,770 psi off. Rotating at 100
rpms with 19kf /lbs torque on and
12kft/lbs off. Observed 12% flow out.
Pick up weight 217k down weight 0.0,
rotating weight 147k/lbs. Actual drilling
time 4.09 hrs. Total Bit time 68.96 hrs.
Total Jar time 204.63 hrs.
> O.A Pressure at 10:00 - 260 psi
> Total fluid losses for the past 12-hrs.
230 bbls
7/26/2019
7/26/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill 6.5" Lt from 25,682'
25,682.0
26,385.0
1200-.
18:00
to 26,385' MD, 7,547' TVD. Weight on
Bit 15k/lbs at 245 gpm with 2,990 psi
on and 2,990 psi off. Rotating at 120
rpms with 19kf /lbs torque on and
14kff/Ibs off. Observed 12% flow out.
Pick up weight 255k down weight 0.0,
rotating weight 142k/lbs. Actual drilling
time 3.78 hrs. Total Bit time 70.87 hrs.
Total Jar time 208.41 hrs.
7/26/2019
7/26/2019
2.75
PROD2
DRILL
DDRL
P
Continue to drill from 26,385' To
26,385.0
26,727.0
18:00
20:45
26,727' MD, 7,547' TVD. Bit Weight
15kfUlbs with 245 gpm and 2,990 psi
on and 2,990 psi off. Rotating at 120
rpms with 19kf tlbs with torque on and
14kff/Ibs with torque off. Observed
12% flow out. Pick up weight 255k,
Down weight 0.0 Rotating weight
142k.
7/26/2019
7/26/2019
2.75
PROD2
DRILL
DDRL
P
At 26,727' MD Bit Stalled at 24kf tlbs
26,727.0
26,746.0
20:45
23:30
torque, with 570 psi pressure drop.
Total fluid loss 184 bbl per hr.
Continued to drill to 26,746' MD,
picked up to 26,724' and rotated at 5
rpms with 14kfMbs off bottom at 42
GPM and 580 psi with 80% losses.
Build and pumped one 37 ppb LCM
pill and circulated, -2,750 strokes.
Picked up to 26,735' and shut in choke
and squeezed at 150 psi. for 8-mins.
Bled pressure off backside and drilled
remaining stand. Connection; adjusted
back pressure to 340 psi which was
unattainable and re-adjusted to 300
psi. Held 300 psi until connection
break, Final back pressure recorded
267 psi upon connection MU. Found
loss rate at 75 bbls per hour and
continued to drill.
7/26/2019
7/27/2019
0.50
PROD2
DRILL
DDRL
P
Continued to drill from 26 746'to
26,746.0
26,768.0
23:30
00:00
26,768' MD at 7,536' TVD. Weight on
bit 12kft/Ibs at 255 gpm with 3,198 psi
torque on and 3,100 psi torque off.
Rotating at 100 rpms with 16kf flbs on
and 13kf tlbs torque off. Flow out was
9%. Pick up weight 255k down weight
0.0 rotating weight 148k. Actual drilling
time 2.72 hrs. Actual Bit time 73.59
hrs. Total Jar time 211.3 hrs.
Total fluid losses from last 12-hrs. -
483 bbl.
O.A. Pressure 150 psi at 23:30
Page 47/58 Report Printed: 8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig:
DOYON 25 Job:
DRILLING ORIGINAL
Time Log
start Depth
Stars Time
End Time
our thin
Phase
Op Cotle
Achvily Corte
Time P -T -X
Operation
(XKB)
End Depth(RKB)
7/27/2019
7/27/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 26,768'to
26,768.0
27,043.0
00:00
06:00
27,043' MD, 7,540' TVD. Weight on bit
15k/lbs with 255 gpm at 3,165 psi on
and 3,102 psi off. Rotating at 100
rpms with 19kft/Ibs torque on and
14kfUlbs torque off. Observed flow out
at 11%. Pick up weight 257k/lbs down
weight 0.0, and rotating weight at
146k/lbs. Encountered stuck floats,
pumped 30 bbl Hi/lo sweep to clear.
Actual drilling time 2.29 hrs, Actual bit
time 75.88 hrs. Total time on Jars,
213.42 hrs.
7/27/2019
7/27/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 27,043'to
27,043.0
27,815.0
06:00
12:00
27,815' MD, 7,550' TVD. Weight on bit
15k/lbs with 245 gpm at 3,065 psi on
and 3,060 psi off. Rotating at 110 rpms
with 12kf /lbs torque on and 14kf /lbs
torque off. Observed flow out at 11 %
Pick up weight 269k/lbs, down weight
0.0, and rotating weight at 143k/lbs.
Max Gas observed at 10,877. Actual
drilling time 3.94, Actual bit time 79.82
hrs. Total time on Jars, 217.36 hrs.
SPR at 26,955' MD, 7,540 TVD. MW —
9.1 ppg Time: 04:30
MP #1 / Strokes @ 20 - 1,060 psi / @
30 — 1,310 psi
MP 42 / Strokes @ 20 - 1,060 psi / @
30 — 1,290 psi
Fluid losses reported f/last 12-hrs. 630
bbls
O.A. Pressure — 120 psi @ 12:00
7/27/2019
7/27/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 27,815'to
27,815.0
28,577.0
12:00
1800
28,577' MD, 7,553' TVD, Weight on bit
13k/lbs with 255 gpm at 2,860 psi on
and 2,880 psi off. Rotating at 120
rpms with 22kfUlbs torque on and
14kft/lbs torque off. Observed flow out
at 11%. Pick up weight 284k/lbs down
weight 0.0, and rotating weight at
146k/lbs. ECD's — 10.94 ppg. Actual
drilling time 4.07, Actual bit time 83.76
hrs. Total time on Jars, 221.43hrs.
Page 48158 ReportPrinted: 8/12/2019
Operations Summary (with Timelog Depths)
r
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
start Depm
Start Tome
EM Time
Dur(hr)
Phase
Op Core
Activity care
Time P -T -X
Operadw
(KKB)
Er Depm(flKS)
7/27/2019
7/28/2019
6.00
PROD2
DRILL
DDRL
P
Continued to drill from 28,577'to
28,577.0
29,166.0
18:00
00:00
29,166' MD, 7,559' TVD. Weight on bit
12-181k/lbs with 255 gpm at 3,255 psi
on and 3,215 psi off. Rotating at 100
rpms with 22kR/lbs torque on and
14kit/lbs torque off. Observed flaw out
at 11%. Pick up weight 284k/lbs down
weight 0.0, and rotating weight at
148k/lbs. ECD's — 10.91 ppg. Actual
drilling time 4.29, Actual bit time 88.18
hrs. Total time on Jars, 225.72hrs.
SPR at 27,909' MD, 7,551 TVD. MW —
9.1 ppg Time: 12:40
MP #1 / Strokes @ 20 - 1,140 psi / @
30 — 1,340 psi
MP #2 / Strokes @ 20 - 1,120 psi / @
30 —1,360 psi
SPR at 29,050' MD, 7,558 TVD. MW —
9.1 ppg Time: 22:15
MP #1 / Strokes @ 20 - 1,120 psi / @
30 — 1,380 psi
MP #2 / Strokes @ 20 - 1,110 psi / @
30 — 1,345 psi
Fluid losses reported Mast 12-hrs. 620
bbls
O.A. Pressure — 100 psi @ 22:30
Total Losses Reported F/MI-1,250
bola
7/28/2019
7/28/2019
8.00
PROD2
DRILL
DDRL
P
Continued to drill the 6.5' production
29,166.0
29,480.0
00:00
08:00
hole from 29,166 to 29,480 MD at
7,663' ND. Weight on bit 1 Ok/lbs with
255 gpm at 3,330 psi on and 3,210 psi
off. Rotating between 70-100 rpms
with 22kftAbs torque on, and 14 torque
off. Observed flow out at 10%. Pick up
weight 257k1lbs down weight O.Ok/lbs,
rotating weight 154kAbs. ECD's at
10.83 ppg, Max Gas 8,919 units.
Actual drilling time — 94.80, Bit time —
96.67 hrs. and total Jar time — 232.34
hrs.
7/2812019
7128/2019
4.00
PROD2
CASING
CIRC
P
Called TD at 29,480' MD. Racked one
29,480.0
29,342.0
08:00
12:00
stand back and circulated bottoms up.
Reciprocated and rotated pipe at
29,342' MD at 255 gpm 13,250 psi
and 60 rpms with torque at 17k/fts.
ECD's 10.64 ppg, rotating weight
140k/lbs.
SPR's @ 29,480' MD, 7,663' TVD MW
9.1 ppg at 08:10
MP41: 20/30-1,10011,320 psi
MP42: 20/30— 1,080 / 1,320 psi
Total losses for last 12-hrs. 475 bbls
7/28/2019
7/28/2019
2.00
PROD2
CASING
CIRC
P
Continued to circulate bottoms up
29,342.0
29,437.0
12:00
14:00
while rotating and reciprocating pipe
from 29,342'to 29,437' MD. Pump
rate remained at 255 gpm at 60 rpms.
Torque remained at 17kftlbs. Rotating
weight 140k/lbs, ECD's at 10.64 ppg.
Total strokes pumped — 17,448 each.
7/28/2019
7/28/2019
2.50
PROD2
CASING
SIPS
P
Performed pore pressure test at 5
29,437.0
29,437.0
14:00
1630
rpms and rotating with 16kft/Ibs
torque. Initial pressure 405 psi, after
19 cycles 253 psi, total returns - 54.75
bbls. Pore pressure was identified at
9.66 ppg.
Page 49158 Report Printed: 811212019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Time
End Time
Our(hr)
Phase
Op Code
Anvity Code
Time P-T-X
Operation
Slant Depth
(ftKB)
End Depth rtKB)
7/28/2019
7/28/2019
1.50
PROD2
CASING
BKRM
P
Continued to circulate in efforts to
29,437.0
29,342.0
16:30
18:00
remove gas while back reaming from
29,437' to 29,342' MD at 255 gpm and
60 rpms with 17kft/lbs of torque.
Rotating weight 140k/lbs. ECD's were
10.64 ppg. Dropped 2.36" hollow drift
with 110'tail in stand 305.
7/28/2019
7/28/2019
4.50
PROD2
CASING
BKRM
P
Continued to circulate out gas while
29,342.0
29,246.0
18:00
22:30
back reaming from 29,342'to 29,246'
MD. Set up and pumped through gas
buster at 170 gpm with 1,725 psi and
40 rpms. Swapped back to flow line
after 10,000 strokes with only 1,200
gas units observed. Continued to back
ream out of hole pulling 600 ft/hr. while
pumping 255 gpm at 3,000 psi. Held
280 psi with MPD. Max torque
observed 18k ft/lbs. rotating weight
161 k/lbs. down weight-0.0k.
7/28/2019
7/29/2019
1.50
PROD2
CASING
BKRM
P
Continued to back ream from 29,246'
29,246.0
28,550.0
22:30
0000
to 28,550' MD. Observed gas increase
peaking at -8,000 units. Re-routed
returns to gas buster and circulated
gas out while holding 380 psi on MPD.
Total losses reported - 195 bbls.
7/29/2019
7/29/2019
6.00
PROD2
CASING
BKRM
P
Continued to back ream from 28,550'
28,550.0
26,481.0
00:00
0600
to 26,481' MD with 255 gpm at 2,800
psi and 11% flow out while rotating at
80 rpm with 15k/lbs torque. Rotating
weight 152k. Maintaining back
pressure at 380 psi, equivalent to 10.0
ppg
7/29/2019
7/29/2019
3.50
PROD2
CASING
BKRM
P
Continue to back ream from 26,481'to
26,481.0
24,955.0
06:00
0930
24,955' MD with 255 gpm at 2,800 psi
with 12% flow out. ECD's were 10.22
ppg while rotating at 75 rpms with
10k/lbs of torque. Rotating weight
147k, pick up weight 220k/lbs, Down
weight remains at 0.0 lbs.
7/29/2019
7/29/2019
2.50
PROD2
CASING
CIRC
P
Circulated bottoms up while
24,955.0
24,876.0
09:30
1200
reciprocating from 24,995'to 24,876'
MD at 255 gpm and 2,800 psi.
Observed 12% flow out with 10kNlbs
torque. Rotating weight remained at
147k/lbs with an ECD of 10.16. Total
Fluid loss over the last 12-hrs. 185
bbls. O.A. pressure at 07:00 / 120.0
PSI.
7/29/2019
7/29/2019
1.00
PROD2
CASING
CIRC
PContinued
to circulate bottoms up
24,876.0
24,864.0
12:00
1300
while reciprocating from 24,876'to
2, 864' MD at 255 gpm and 2,800 psi.
Observed flow out at 12% while
rotating at 75 rpms with 10kf /lbs of
torque. ECD's were observed at 10.13
ppg. Pick up weight 147k/lbs.
Page 50/58 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stag Time
End Time
our (hr)
Phase
Op carie
Actively CDda
Time P -T -X
Operation
SWit Depth
(10K8)
End DepM (flKB)
7/29/2019
7/29/2019
4.50
PROD2
CASING
DISP
Displaced 9.1 ppg FloPro to 10.0
24,864.0
24,864.0
13:00
17:30
Brine, pumped a 25 bbls of high -Vis
spacer while reciprocating from
24,959'to 24,864' MD at 255 gpm.
Initial circulating pressure was 2,400
psi at 240 gpm with a final circulating
pressure of 2,170 psi. Observed 12%
flow out at 75 rpms and 10kftAbs of
torque. Rotating weight 147k. Pick up
weight 2191k/Ibs, down weight 83k/lbs
and final rotating weight 150k/lbs with
torque increasing to 14kfUlbs.
7/29/2019
7/29/2019
2.00
PROD2
CASING
OWFF
Monitored well for flow, SIMOPS
24,864.0
24,864.0
17:30
19:30
Serviced Equipment on dg floor.
729/2019
7/30/2019
4.50
PROD2
CASING
SMPD
Stripping out of hole as per MPD
24,864.0
22,295.0
19:30
00:00
schedule / Rep from 24,864' to 22,295'
MD while maintaining back pressure in
slips and utilizing mud pump 1 at 40
strokes per min as per detailed
pressure / depth chart. Manually
strapping trip tank every 5 stands Pick
up weight 134k/lbs down weight
remains at 84k/lbs. Total losses for the
last 24-hrs 310 Wis. Average loss
during stripping —17 bbls per 5 -
stands.
O.A. pressure at 23:30 — 80 psi
SPR's at 24,947' MD, 7,500' TVD, MW
10.0 ppg, Time -23:30
MP41: 20 130 — 480 psi 1780 psi
MP -#2: 20 130 — 440 psi 1720 psi
7/30/2019
7/30/2019
7.00
PROD2
CASING
SMPD
P
Strip out of hole from 22,295' MD to
22,295.0
17,921.0
00:00
07:00
17,921' MD, Laid down 61 doubles to
pipe shed tubs.. Re -shoot survey @
18,676' for SLB. P/U=240k, S/0=941k.
7/30/2019
7/30/2019
3.00
PROD2
CASING
SMPD
P
Continued to strip out of the hole from
17,921.0
14,692.0
07:00
10:00
17,921' MD to 14,692' MD with 4" DP.
Racked back DP in Derrick.
P/U=218k, S/0=109k. Monitored
displacement on pit #3.
7/302019
7/30/2019
2.50
PROD2
CASING
CIRC
P
CBU while reciprocating from 14,692'
14,692.0
14,692.0
10:00
12:30
MD to 14,597' MD. GPM = 240,
SPP=1,700 psi, RPM = 120, Torque =
8K, ROT=143, Max Gas = 987 units.
7/30/2019
7/30/2019
1.00
PROD2
CASING
SMPD
P
Strip out of hole from 14,692 MD to
14,692.0
14,042.0
12:30
13:30
14,042' MD, Racked back DP in
Derrick. P/U=207k, S/0=113k.
Monitored displacement on pit #3. No
excess drag when pulling BHA
through window.
7/30/2019
7/30/2019
1.00
PROD2
CASING
SLPC
P
Slipped and cut 157' of drill line (20
14,042.0
14,042.0
13:30
14:30
wraps). Serviced top drive, blocks,
draw works, SIMOPS, monitored well
on pits #2, and #3. 12 We breathe
back.
7/30/2019
7/30/2019
3.50
PROD2
CASING
SMPD
P
Strip out of hole from 14,042' MD to
14,042.0
7,375.0
14:30
18:00
7.375' MD, Racked back DP in
Derrick. P/U=118k, S/O=82k.
Monitored displacement on pit #3.
Page 51158 ReportPrinted: 8/1 212 01 9
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Time
End Time
D, (m)
Phase
Op Code
Activity Code
Time P -T -X
Operation
Start Depth
(MB)
End Depth(ftKB)
7/30/2019
7/30/2019
5.25
PROD2
CASING
SMPD
P
Strip out of hole from 7,375' MD to
7,375.0
532.0
18:00
23:15
532' MD, Racked back DP in Derrick.
P/U=110k, S/0=74k @ 5,000' MD.
Monitored displacement on pit #3.
Encountered severe tool joint wear on
some connections at 7,000' MD. L/D 4
singles to the pipe shed. Observed
overtorqued connections with rig
tongs. B/O torque=54k.
7/30/2019
7/31/2019
0.75
PROD2
CASING
OWFF
P
OWFF through MPD. Shut in choke to
532.0
532.0
23:15
0000
verify pressure drops every 15
minutes. Reduced ballooning flow
trend was observed after each choke
shut in sequence. Estimated
cumulative bleed back of -22 bbls (8
bph) at 7/31/2019 00:00.
SIMOPS - Cleaned and cleared rig
floor, prepped tools for RCD bearing
swap, prepped tools for laying down
BHA #8 w/ SLB. Held a PJSM prior to
changing out RCD bearing to trip
nipple.
7/31/2019
7/31/2019
6.50
PROD2
CASING
OWFF
P
OWFF through MDP. Shut in choke to
532.0
532.0
00:00
06:30
verify pressure drops every 15
minutes.
7/31/2019
7/31/2019
1.00
PROD2
CASING
MPGA
P
Pulled RCD bearing and installed trip
532.0
532.0
06:30
07:30
nipple as per MDP representative.
Hooked up jet pump line, purged
system, and verified mud fill.
7/31/2019
7/31/2019
2.50
PROD2
CASING
BHAH
P
POOH from 532' MD to 343' MD.
532.0
0.0
07:30
10:00
Racked back one stand and laid
down two singles to in the pipe shed.
Changed out jars for one joint of
HWDP Racked back two stands of
HWDP in preparation for the
subsequent liner run. UD BHA#8 as
per SLB DD. The bit was observed to
be ringed out.
7/31/2019
7/31/2019
1.00
COMPZ2
CASING
BHAH
P
Cleaned and cleared rig floor of all
0.0
0.0
10:00
11:00
j
non essential tools and equipment.
7/31/2019
7/31/2019
1.50
COMPZ2
CASING
PUTB
P
Rigged up to run 4-1/2" liner as per
0.0
0.0
11:00
12:30
Doyon casing.
7/31/2019
7/31/2019
5.50
COMPZ2
CASING
PUTB
P
Held PJSM. RIH to 5,500' MD with 4-
0.0
5,500.0
12:30
18:00
1/2" 12.6 ppf L-80 H563 liner as per
planned tally. UW = 86k, DW = 78k,
and monitored displacement via pit #2.
7/31/2019
8/1/2019
6.00
COMPZ2
CASING
PUTB
P
RIH w/ 4-1/2" 12.6 ppf L-80 H563 liner
5,500.0
12,580.0
18:00
00:00
with spaced out ported joints from
5,500' MD to 12,580' MD. PIU = 98k,
S/O = 82k. Maintained constant hole
fill and manually strapping trip pit
every 10 joints.
8/1/2019
8/1/2019
1.00
COMPZ2
CASING
PUTB
P
RIH w/ 4-1/2" 12.6 ppf L-80 H563 liner
12,580.0
12,643.0
00:00
01:00
with spaced out ported joints from
12,580' MD to 12,643' MD. PIU -
150k, S/O = 98k. Maintained constant
hole fill and manually strapping trip pit
every 10 joints.
8/1/2019
8/1/2019
0.50
COMPZ2
CASING
PUTB
P
PJSM. P/U and M/U BOT Liner
12,643.0
12,643.0
01:00
01:30
Setting Sleeve. Torqued to 3,800 ftlbs.
Changed out handling equipment to
4".
Page 52158 Report Printed: 8/1 212 01 9
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Time
EW Time
Dur(hr)Phase
Op Code
Activity CWe
Time P4 -X
Operation
Stan Depth
(rt KB)
EM Depth (flKB)
8/1/2019
8/1/2019
1.50
COMPZ2
CASING
RUNL
P
RIH with liner on 4" DIP from 12,643'
12,643.0
14,003.0
01:30
03:00
MD to 12,765' MD. Established
circulation. 1 bpm/60 psi, 2 bpm/80
psi, and 3 bpm/154 psi. Continued to
RIH from 12,765' MD to 14,003' MD.
Obtained base line torque and drag
data prior to entering open hole:
1 bpm/62 psi
2 bpm/84 psi
Torque at 10 RPM = 8.5 kftlbs
Torque at 20 RPM = 9.0 kftlbs
P/U Weight = 167 kftlbs @ 1 bpm
S/O Weight = 107 kftlbs @ 1 bpm
8/1/2019
8/1/2019
3.00
COMPZ2
CASING
RUNL
P
RIH from 14,003' MD to 18,560' MD.
14,003.0
18,560.0
03:00
06:00
Observed 3k through the window.
Constant hole fill. Manually strap trip
pit every 5 stands. P/U = 195 klbs, &
S/O = 92 kibs.
8/1/2019
8/1/2019
6.00
COMPZ2
CASING
RUNL
P
RIH from 18,560' MD to 24,367' MD.
18,560.0
24,367.0
06:00
12:00
P/U = 232 klbs, & S/O = 80 klbs.
Monitored displacement with pit #2.
8/1/2019
8/1/2019
6.00
COMPZ2
CASING
RUNL
P
RIH from 24,367' MD to 26,742' MD.
24,367.0
26,787.0
12:00
18:00
Rotated liner from 26,742' MD to
26,787' MD. Rotating weight = 134
kbls, 10 RPM, and Torque= 14.5
kftlbs. Monitored displacement with pit
#2.
8/1/2019
8/1/2019
3.00
COMPZ2
CASING
RUNL
P
Rotated liner from 26,787' MD to
26,787.0
26,825.0
18:00
21:00
26,851' MD at 10 rpm (P/U = 248
klbs). Picked up to a setting depth of
26,825' MD. Dropped 29132" phenolic
ball and pumped it down at 3 bpm
(SPP 478 psi) for 800 strokes.
Reduced the pump down rate to 1.5
bpm (SPP 175 psi) until the ball finally
seated at 1178 strokes. Pressured up
to 3,000 psi. Lowered the string till the
hookload reached 88 kllbs. Picked up
to release and disengage from the
liner. Pressured up to 4,572 psi and
blew the ball with the test pump.
Verified release of the running tool
from the 4 1/2" liner. L/D single joint of
DP and racked back one stand of OR
P/U = 198 klbs, & S/O = 135 klbs.
8/1/2019
81112019
1.75
COMPZ2
WELLPR
CIRC
P
Circulated a total of 4,600 strokes @ 4
14,000.0
14,000.0
21:00
22:45
bpm (SPP 530 psi & 5% flow).
8/1/2019
811/2019
0.50
COMPZ2
WELLPR
CIRC
P
Recorded slow pump rates at 14,000'
14,000.0
14,000.0
22:45
23:15
MD (MW=10 ppg)
Mud Pump #1
20 spm = 210 psi
30 spm = 360 psi
Mud Pump #2
20 spm = 230 psi
30 spm = 370 psi
8/1/2019
8/212019
0.75
COMPZ2
WELLPR
OWFF
P
OWFF @ 14,000'. Found well to be
14,000.0
14,000.0
23:15
00:00
flowing at 2.6 bph. Continued
monitoring the well for flow. Observed
flow back every 15 minutes. Rates
gradual declined to 1.8 bph.
8/2/2019
8/2/2019
2.75
COMPZ2
WELLPR
OWFF
P
OWFF. Conducted breathing test.
14,000.0
14,000.0
00:00
02:45
Verified shut in pressure reduction.
8/2/2019
8/212019
0.25
COMPZ2
WELLPR
CIRC
P
Pumped 100 bbls (10.2 ppg) slug at 4
14,000.0
14,000.0
0245
03:00
bpm with SPP 500 psi. P/U =195 klbs.
Page 53158 Report
Printed:
8/12/2019
Uperations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stan Time
End Time
our ft)
Phase
Op Code
Acaviry Code
Time P-T-X
Operabon
Stan Dept
(kKB)
End Dept (111<8)
8/2/2019
8/2/2019
3.00
COMPZ2
WELLPR
TRIP
P
POOH with 4" DP from 14,000' MD to
14,000.0
9,900.0
03:00
06:00
13,489' MD. LID 24 joints of 4" HWDP
from 13,489' MD to 13,394' MD.
Resumed POOH from 13,394' MD to
9,900' MD.. PIU = 130k, and SIO =
91 k.
8/2/2019
812/2019
4.50
COMPZ2
WELLPR
TRIP
P
POOH from 9,900' MD to 5,537' MD
9,900.0
5,537.0
06:00
10:30
with 4" DP (Racked stands back in
derrick). UW = 100k and DW = 85k.
8/2/2019
8/2/2019
0.50
COMPZ2
WELLPR
OWFF
P
OWFF (Static) for 30 minutes, slight
5,537.0
5,537.0
10:30
11:00
drop.
8/2/2019
8/2/2019
4.00
COMPZ2
WELLPR
TRIP
P
POOH from 5,537' MD to Surface with
5,537.0
0.0
11:00
15:00
4" DP (Racked stands back in derrick).
Also laid down Baker Liner running
tool.
8/2/2019
8/2/2019
0.50
COMPZ2
WHDBOP
MPSP
P
Pulled wearbushing and set upper lest
0.0
0.0
15:00
15:30
plug.
812/2019
8/2/2019
1.00
COMPZ2
WHDBOP
RURD
P
Rigged up to test BOPs.
0.0
0.0
15:30
16:30
8/2/2019
8/2/2019
6.00
COMPZ2
WHDBOP
BOPE
P
Tested BOPS: All Rams, Annular, and
0.0
0.0
16:30
22:30
valves were tested to Low 250
psi/High 3,500 psi. Tested annular,
Rams #1, & #3 with 4" & 4 1/2" test
plugs. Tested 4" FOSV and 4" dart
valve. All primary and remote BOPE
controls, Koomey and Driller's station
were tested. The lower kelly IBOP
initial lest failed.
8/2/2019
8/3/2019
1.50
COMPZ2
WHDBOP
RGRP
T
Changed out lower IBOP and saver
0.0
0.0
22:30
00:00
1
1
sub on top drive.
8/3/2019
8/3/2019
1.00
COMPZ2
WHDBOP
RGRP
P
Changed out Lower IBOP and saver
0.0
0.0
00:00
01:00
sub.
8/312019
8/312019
0.50
COMPZ2
WHDBOP
BOPE
P
Tested lower IBOP Low 250 psi/ High
0.0
0.0
01:00
01:30
2,500 psi. Passed.
8/3/2019
8/3/2019
1.50
COMPZ2
WHDBOP
MPSP
P
B/D choke manifold, and Choke/Kill
0.0
0.0
01:30
03:00
Lines. Cleaned and cleared rig floor.
Pulled test plug and installed 12" x 6
7/8" ID x 10 3/4" OD wear ring.
8/3/2019
8/3/2019
1.25
COMPZ2
FISH
BHAH
P
M/U and scribed Whipstock Retrieval
0.0
0.0
03:00
04:15
1
1
BHA.
8/3/2019
813/2019
1.75
COMPZ2
FISH
TRIP
P
RIH with Whipstock retieval BHA from
0.0
3,011.0
04:15
06:00
161' MD to 3,011' MD w/ 4" DP from
derrick. UW = 81 k, and DW = 80k.
Shallow tested the MWD at 2,061' MD.
8/3/2019
8/3/2019
6.00
COMPZ2
FISH
TRIP
P
RIH from 3,011' MD to 13,960' MD. w/
3,011.0
13,960.0
06:00
12:00
4" DP from derrick. UW = 220k, and
DW = 120k. Logged R/A tag at 13,885'
MD.
8/3/2019
8/3/2019
4.50
COMPZ2
FISH
FISH
P
Washed down from 13,960' MD to
13,960.0
14,082.0
12:00
16:30
14,140' MD at 250 gpm (1,500 psi,
13% FLow, UW = 206k, DW = 120k.
As per Baker rep, oriented 135
degrees LOHS, washed whipstock slot
X4, Attempted to hoo. Washed slot X5.
Oriented 45 degrees ROHS.
Eventually hooked whipstock at
14,129' MD. Jarred free with 6 hits.
UW= 213k. POOH to 14082' MD.
8/3/2019
8/3/2019
1.50
COMPZ2
FISH
CIRC
P
CBU at 250 gpm (SPP 1,500 psi and
14,082.0
14,082.0
16:30
18:00
13% Flow). Initial loss rate was 100
bbls/hr. Losses gradually reduced
when lowering the flow down to 3.8
bpm.
Page 54/58 Report Printed: 8/1212019
n . Operations Summary (with Timelog Depths)
t
CDS-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Stam Time
I End Time
our (hr)
Phase
Op Code
Activity Cod.
Time P -T -X
Operation
Start Dept
(ftKB)
End Dept (WS)
8/3/2019
8/3/2019
0.75
COMPZ2
FISH
CIRC
P
Recorded Slow pump rates and
14,082.0
14,082.0
18:00
1845
circulated:
#1 Mud Pump
20 spm / 270 psi
30 spm 1450 psi
#2 Mud Pump
20 spm / 260 psi
30 spm / 440 psi
8/3/2019
8/3/2019
3.00
COMPZ2
FISH
TRIP
P
POOH from 14,082' MD to 11,815'
14,082.0
11,815.0
18:45
21:45
MD. Monitored hole for swabbing and
adjusted pulling speed to obtain
proper hole fill, 1,080 - 1,800 fph. PIU
= 180k. Monitored well with constant
fill on pit #2.
8/3/2019
8/4/2019
2.25
COMPZ2
FISH
OWFF
P
OWFF at 11.815' MD. The well
11,815.0
11,815.0
21:45
00:00
ballooned back a total of 8.7 bbls until
static conditions were finally observed:
Time (min)/Flow Out (bph):
10/15
20/9.6
30/5.4
40/3.0
50/1.2
60/0.6
7010,23
80/0.05
90/0
120/0
8/4/2019
8/4/2019
6.00
COMPZ2
FISH
TRIP
P
POOH from 11,815' MD to 1,324' MD.
11,815.0
1,324.0
00:00
06:00
Monitored well with constant fill on pit
#2.
8/4/2019
8/4/2019
1.00
COMPZ2
FISH
TRIP
P
POOH from 1,324' MD to 255' MD.
1,324.0
255.0
06:00
07:00
Monitored well (10 bph static losses)
8/4/2019
8/4/2019
2.50
COMPZ2
FISH
BHAH
P
PJSM. L/D hook and whipstock
255.0
0.0
07:00
09:30
assembly as per Baker Hughes Rep.
8/4/2019
8/4/2019
1.00
COMPZ2
RPCOMP
CLEN
P
Cleaned and cleared rig floor of all
0.0
0.0
09:30
10:30
non essential tools and equipment,
Staged clean out BHA on rig floor.
8/4/2019
8/4/2019
1.50
COMPZ2
RPCOMP
SLPC
P
PJSM. Slipped and cut drill line (17
0.0
0.0
10:30
1200
wraps). Serviced top drive, blocks,
draw works, and iron roughneck.
8/4/2019
8/4/2019
1.00
COMPZ2
RPCOMP
BHAH
P
PJSM. P/U clean out BHA as per
0.0
147.0
12:00
13:00
Baker rep to 147'. UW=47k, and DW=
50k.
8/4/2019
8/4/2019
7.00
COMPZ2
RPCOMP
TRIP
P
RIH from 147' MD to 14,130' MD w/ 4"
147.0
14,130.0
13:00
20:00
DP from the derrick. UW = 205k and
DW = 120k. Monitored displacement
on pit #2. Filled pipe every 20 stands
for displacement.
8/4/2019
8/4/2019
1.00
COMPZ2
RPCOMP
CIRC
P
Filled pipe at 5 bpm (785 psi, 8% Flow
14,130.0
14,205.0
20:00
21:00
out, UW= 205k, DW= 120k). Observed
pressure increase at 14,205' MD (905
psi), Set down with 5klbs @ 14,225'
MD,
Page 55158 ReportPrinted: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Time
End Time
our (hQ
PhaseOp
Code
Aoliviry Cod.
Time P-T-X
Operation
Start Depth
(ftKB)
End Depth(ftKB)
8/4/2019
8/5/2019
3.00
COMPZ2
RPCOMP
CIRC
P
Pumped 75 bbls Hi Vis Sweep at 210
14,205.0
14,205.0
21:00
00:00
gpm (780 psi, 7% flow out put. Max
gas = 219, and total strokes = 7,365.
Recorded Slow pump rates and
circulated:
#1 Mud Pump
20 spm 1260 psi
30 spm 1370 psi
#2 Mud Pump
20 spm / 240 psi
30 spm / 370 psi
8/5/2019
8/5/2019
2.75
COMPZ2
RPCOMP
OWFF
P
OWFF. Observed 41.3 bbls flow back
14,205.0
14,205.0
00:00
0245
until static conditions were reached.
8/5/2019
8/5/2019
1.75
COMPZ2
RPCOMP
TRIP
P
POOH from 14,205' MD to 13,529' MD
14,205.0
13,529.0
02:45
0430
on elevators whilst L/D 4" DP to pipe
shed. Monitored hole fill on pit #2. P/U
= 215k and SO = 90k.
8/5/2019
8/5/2019
0.25
COMPZ2
RPCOMP
OWFF
P
OWFF. Static.
13,529.0
13,529.0
04:30
0445
8/5/2019
8/5/2019
1.25
COMPZ2
RPCOMP
TRIP
P
POOH from 13,529' MD to 13,130' MD
13,529.0
13,130.0
04:45
06:00
on elevators whilst UD 4" DP to pipe
shed. Monitored hole fill on pit #2. P/U
= 200k and SO = 115k.
8/5/2019
8/5/2019
6.00
COMPZ2
RPCOMP
TRIP
P
POOH from 13,130' MD to 9,849' MD
13,130.0
9,849.0
06:00
12:00
on elevators whilst L/D 4" DP to pipe
shed. Monitored hole fill on pit #2. P/U
= 132k and SO = 90k.
8/5/2019
8/5/2019
6.00
COMPZ2
RPCOMP
TRIP
P
POOH from 9,849' MD to 7,120' MD
9,849.0
7,120.0
12:00
18:00
on elevators whilst UD 4" DP to pipe
shed. Monitored hole fill on pit #2. P/U
= 110k and SO = 88k.
8/5/2019
8/6/2019
6.00
COMPZ2
RPCOMP
TRIP
P
POOH from 7,120' MD to 3,380' MD
7,120.0
3,380.0
18:00
00:00
on elevators whilst UD 4" DP to pipe
shed. Monitored hole fill on pit #2. P/U
=81k and SO=61 k.
8/6/2019
8/6/2019
4.50
COMPZ2
RPCOMP
TRIP
P
POOH from 3,380' MD to O' MD on
3,380.0
0.0
00:00
04:30
elevators whilst UD 4" DP to pipe
shed. Monitored hole fill on pit #2.
8/6/2019
8/6/2019
1.50
COMPZ2
RPCOMP
BHAH
P
Changed out BHA while OWFF:
0.0
0.0
04:30
06:00
Cleaned magnets, L/D string mills and
jars. M/U bull nose, floats, and
magnets.
8/6/2019
8/6/2019
6.00
COMPZ2
RPCOMP
TRIP
P
RIH from surface to 12,896' MD with
0.0
12,896.0
06:00
12:00
4" DP from the derrick. UW = 188k
and DW = 108k. Monitored
displacement on pit #2. Filled pipe
every 20 stands.
8/6/2019
8/6/2019
1.75
COMPZ2
RPCOMP
CIRC
P
Displaced well to 10.2 ppg Corrosion
12,896.0
12,896.0
12:00
1345
Inhibited Brine. Rotated and
reciprocated pipe from 12,857' MD to
12,952' MD. 253 gpm, Observed the
following parameters: ICP = 720 psi,
FCP = 710 psi, F/O = 9%, UW = 188k,
DW = 108k, RTW = 139k, TO = 10k,
Total strokes = 6,354, Max gas = 635,
and Losses = 96 bbls.
8/6/2019
8/6/2019
2.00
COMPZ2
RPCOMP
OWFF
P
OWFF Observed 34 bbls flow back
12,896.0
12,896.0
13:45
15:45
until static conditions were reached in
90 minutes.
Page 56/58 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
+
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
Start Time
End Time
Our (hr)
Phase
Op Cotle
Activity Cotle
Time P-T-X
Operation
Start Depth
(ftKa)
End Depth mK5)
8/6/2019
8/6/2019
2.25
COMPZ2
RPCOMP
TRIP
P
POOH from 12,896' MD to 12,022' MD
12,896.0
12,022.0
15:45
1800
on elevators whilst UD 4" DP to pipe
shed. UW = 150k and DW = 111 k.
Pumped 20 bbls dry job at 12,477'
MD.
8/6/2019
8/7/2019
6.00
COMPZ2
RPCOMP
TRIP
P
POOH from 12,022' MD to 8,149' MD
12,022.0
8,149.0
18:00
0000
on elevators whilst L/D 4" DP to pipe
shed. UW = 105k and DW = 85k.
Monitored well w/ constant hole fill via
pit #2.
8/7/2019
8/7/2019
6.00
COMPZ2
RPCOMP
TRIP
P
POOH from 8,149' MD to 4,067' MD
8,149.0
4,067.0
00:00
06:00
on elevators whilst L/D 4" DP to pipe
shed. UW = 89k and DW = 86k.
Monitored well w/ constant hole fill via
pit #2.
8/7/2019
8/7/2019
4.00
COMPZ2
RPCOMP
TRIP
P
POOH from 4,067' MD to surface on
4,067.0
0.0
06:00
10:00
elevators whilst L/D 4" DP to pipe
shed. Monitored well w/ constant hole
f II via pit #2.
8/7/2019
8/7/2019
0.75
COMP22
RPCOMP
BHAH
P
UD BHA: magnet, pups, Floats, and
0.0
0.0
10:00
10:45
bull nose.
8/7/2019
8/7/2019
0.50
COMPZ2
RPCOMP
WWWH
P
Pulled wear ring in preparation to
0.0
0.0
10:45
11:15
wash wellhead and BOPS.
8/7/2019
8/7/2019
0.75
COMPZ2
RPCOMP
WWWH
P
Made stack washer, washed wellhead,
0.0
0.0
11:15
1200
and BOP stack. 415 gpm, 20, rpm.
UD stack washer and last two joints of
DR
8/7/2019
8/7/2019
1.50
COMPZ2
RPCOMP
RURD
P
Rigged up to run 4 1/2" Upper
0.0
0.0
12:00
1330
Completions.
8/7/2019
8/7/2019
4.50
COMPZ2
RPCOMP
RCST
P
RIH from surface to 1,280' MD w/ 4
0.0
1,280.0
13:30
1800
1/2" 12.6 ppf L-80 H563 as per
planned upper completions detail.
UW= 54k, and DW=59k. Tested I-Wire
after termination to 5,000 psi for 5
minutes (Witnessed).
8/7/2019
8/8/2019
6.00
COMPZ2
RPCOMP
RCST
P
RIH from 1,280' MD to 6,289' MD w/4
1,280.1)
6,289.0
18:00
00:00
1/2" 12.6 ppf L-80 H563 as per
planned upper completions detail.
UW= 79k, and DW=81k. Tested I-Wire
every 10-15 joints.
8/8/2019
8/8/2019
6.00
COMPZ2
RPCOMP
RCST
P
RIH from 6,289' MD to 11,839' MD w/
6,289.0
11,839.0
00:00
0600
4 1/2" 12.6 ppf L-80 H563 as per
planned upper completions detail.
UW= 129k, and DW = 102k. Tested I-
Wire every 10-15 joints.
8/8/2019
8/8/2019
4.00
COMPZ2
RPCOMP
RCST
P
RIH from 11,839' MD to top of No Go
11,839.0
14,186.0
06:00
1000
at top of liner at 14,228' MD w/ 4 1/2"
12.6 ppf L-80 H563 as per planned
upper completions detail. UW= 162k,
and DW = 102k. Tested I-Wire every
10-15 joints. UD 3 joints to 14,148'.
P/U 37.95' space outjoint. RIH to
-1
14,186' MD.
8/8/2019
8/8/2019
50
COMPZ2
RPCOMP
RCST
P
As per FMC rep, M/U hanger and
14,186.0
14,186.0
10:00
11:30
Landing joint. Terminated I-Wire on
hanger and tested to 5,000 psi for 5
minutes. (Witnessed).
8/8/2019
8/8/2019
0.50
COMPZ2
RPCOMP
RCST
P
per FMC rep, landed hanger, and
14,186.0
14,217.0
11:30
12:00
ran in lock down screws. WLEG @
JAs
14,216.63' MD. In hole 341 full
clamps, 7 half clamps.
Page 57/58 Report Printed: 8/12/2019
Operations Summary (with Timelog Depths)
CD5-98
Rig: DOYON 25 Job: DRILLING ORIGINAL
Time Log
$tartTime
End Time
our (m)
Phase
Op Code
Activity Code
Time P -T -X
Operation
Start Depth
(ftKB)
End Depth(ftKB)
8/8/2019
8/8/2019
3.50
COMPZ2
RPCOMP
PRTS
P
R/U to test tubing and annulus. Tested
14,217.0
14,217.0
12:00
1530
tubing to 4,200 psi. Pressure dropped
at 4 minutes into the test by 100 psi in
3 minutes. Began losing pressure
faster, Bled off pressure. Consulted
with engineer. Halliburton packer was
set at 2,400 psi. and 2,600 psi. Tested
IA to 1,500 psi for 30 minutes
(Charted).
8/8/2019
8/8/2019
0.50
COMPZ2
RPCOMP
CIRC
P
Sheared SOV at 2,200 psi. Pumped 8
14,217.0
14,217.0
15:30
16:00
bbls @ 1.5 bpm and 360 psi to ensure
full shear. R/D pumping equipment on
landing joint. OWFF for 10 minutes.
(Static).
8/8/2019
8/8/2019
1.00
COMPZ2
WHDBOP
PRTS
P
Pulled landing joint. Set HP type H
14,217.0
14,217.0
16:00
17:00
BPV as per FMC. Instaled landing
joint. Tested BPV in direction of flow.
to 2,200 psi for 10 minutes (Charted).
Pumped 1 SPM to maintain test
pressure. OWFF for 30 minutes
(Static). L/D landing joint.
8/8/2019
8/8/2019
3.50
COMPZ2
WHDBOP
NUND
P
N/D BOPs. UD trip nipple, removed
14,217.0
14,217.0
17:00
20:30
Joes box, kill lines, choke lines, rack
back BOP stack, N/D 14.5' riser, 3'
spool, and 11" x 13 5/8" DSA,
8/8/2019
8/9/2019
3.50
COMPZ2
WHDBOP
NUND
P
As per FMC and SLB repsm
14,217.0
14,217.0
20:30
0000
terminated I -Wire. N/U adapter and
frac tree.
8/9/2019
8/9/2019
3.00
COMPZ2
WHDBOP
NUND
P
M/U Flange and frac tree as per FMC
14,217.0
14,217.0
00:00
0300
rep.
8/9/2019
8/9/2019
1.00
COMPZ2
WHDBOP
PRTS
P
Tested adapter flange to 5,000 psi
14,217.0
14,217.0
03:00
0400
(Witnessed)
8/9/2019
8/9/2019
1.00
COMPZ2
WHDBOP
PRTS
P
Filled Frac tree with diesel. Tested
14,217.0
14,217.0
04:00
05:00
Frac tree to 250 psi/10,000 psi for 10
minutes each.
8/9/2019
8/9/2019
1.00
COMPZ2
WHDBOP
PRTS
P
Pulled test dart and HP BPV. Rigged
14,217.0
14,217.0
05:00
06:00
up in preparation to pump freeze
protect. Pressure tested manifold and
hardlines to 2,500 psi.
8/9/2019
8/9/2019
2.00
COMPZ2
WHDBOP
FRZP
P
Pumped 86 bbls of diesel freeze
14,217.0
14,217.0
06:00
0800
protect from the ball mill into the IA
and lined up U -tubed to balance at
2,000' TVD. Installed H BPV SIMOPS:
Lowered cattle chute, disconnected
pits and pump interconnects, and
prepped to scope down derrick.
8/9/2019
8/9/2019
4.00
DEMOB
MOVE
DMOB
P
Scoped derrick down, secured top
14,217.0
14,217.0
08:00
1200
drive, energy track, bails, roof caps on
tuggers, and cleaned pits.
8/9/2019
8/9/2019
2.00
DEMOB
MOVE
OMOB
P
Raised C -Section and Pin.Opened
14,217.0
14,217.0
12:00
14:00
doors on rig floor and extended mast
cylinders. Continue remove fluids from
pits and ball mill.
8/9/2019
8/9/2019
2.00
DEMOB
MOVE
DMOB
P
Held a safety stand up. Skidded rig
14,217.0
14,217.0
14:00
16:00
floor, and derrick. Ball mill emptied of
fluids. Released from well CD5-98 on
08/09/2019 at 16:00 hrs.
Page 58/58 Report Printed: 8/12/2019
NADConversion
Western North Slope
CD5 Alpine West Pad
CDS-98L1
F6-
27 AJuiSP 4
ConocoPhillips
Definitive Survey Report
14 August, 2019
Final Definitive Survey
Verified and Signed -off
All targets and/or well position objectives have been achieved.
❑ Yes ❑ No
I have checked to the best of my ability that the following data is correct:
E)
Surface Coordinates
O
Declination 8 Convergence
2
GRS Survey Corrections
stephen.fell@c
❑
Survey Tool Codes
ontractor.cono a
SLB De
cophillips.com
Client Representative:
MatthewSmith.'
Date:
ConocoPhillips
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference:
Well CD5-98
Project:
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usft (D25)
Site:
COS Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
Well:
CD5-98
North Reference:
True
Wellbore:
CD5-981_1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-98L7
Database:
EDT 14 Alaska Production
Project Western North Slope, North Slope Alaska, United States
Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level
Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point
Map Zone: Alaska Zone 04 Using geodetic scale factor
yWY CD5-98
ACTUAL
Tie On Depth:
Well Position +N/S
0.00 usft
Northing:
+El -W
0.00 usft
Easting:
Position Uncertainty
0.00 usft
Wellhead Elevation:
1,426.06 CDS98 Srvy 2- SLB _MWD+GMAG(CD
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Mult4Sbuion Correcl6/7/2019 8:27:0,
Wellbore CD5.98L1
Magnetics Model Name Sample Date
BGGM2018 6/15/2019
Design CD5-98L1
Audit Notes:
Version: 1.0
Vertical Section:
5,965,926.49 usft Latitude:
349,577.80 usft Longitude:
0.00 usft Ground Level:
70° 18'50.480 N
151°13'6.948W
33.90 usft
Declination Dip Angle Field Strength
(9 0 Inn
16.09
Phase:
ACTUAL
Tie On Depth:
Depth From (TVD)
+N/S
+EI -W
(usft)
lush)
(usft)
39.55
0.00
0.00
80.73
14,075.51
Direction
C)
176.10
57,376
Survey Program Data
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name Description Survey Date
124.86
705.01 CD5-98 Srvy 1 - SLB_GWD70 (CD5-98)
GYD-GC-SS Gyrodata gyro single shots 6/7/2019 8:24:0
802.88
1,426.06 CDS98 Srvy 2- SLB _MWD+GMAG(CD
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Mult4Sbuion Correcl6/7/2019 8:27:0,
1,484.04
1,745.70 CDS98 Srvy 3- SLB_GWD70 (CDS-98)
GYD-GC-SS Gyrodata gyro single shots 6/8/2019 8:24:0,
1,802.20
2,214.38 CDS-98 Srvy 4-SLB_MWD+GMAG(CD
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Coned6/7/2019 8:27:01
2,305.63
2,305.63 CD5-98 Srvy 5- SUB _MWD_INC-Filler(C
MWD-INC_ONLY(INC>10°)MWD-INC_ONLY_FILLER(INC>10`) 6/11/2019 802:1
2,399.18
14,075.51 CD5-98 Srvy 6-SLBMWD+GMAG(CD
MWD+IFR2+SAG+MS OWSG MWD +IFR2+ Sag +Multi -Station Correct6/12/20198:06:1
14,120.00
14,344.65 CD5-981.7 Srvy 1-SLB_MWD-INC only
MWD -INC ONLY (INC>l0°) MWD -INC_ ONLY FILLER ( INC>10°) 7/22/2019 9:41:
14,439.17
14,534.05 C135-9811 Srvy 2- SLB _MWD+GMAG(C
MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Mufti -Station Correcl7/22/201912:55
14,629.21
14,629.21 CDS98L1 Srvy 3-SLB_MWD-INC-ONLY
MWD-INC_ONLY(INC>10°)MWD-INC_ONLY FILLER(INC>10°) 7/22/2019 12:55
14,724.28
18,523.06 C135-981.1 Srvy 4-SLB_MWD+GMAG(C
MWD+IFR2+SAG+MS OWSG MWD+IFR2+ Sag +Multi -Station Coned7/22/20191255
18,617.37
18,617.37 CD5-981_1 Srvy 5- SLB _MWD -INC -ONLY
MWD -INC _ ONLY (INC>10°)MWD-INC _ ONLY FILLER(INC>10°) 7/24/201912:55
18,713.94
29,420.46 CD5-98L1 Srvy 6-SLB_MWD+GMAG(C
MWD+IFR2+SAG+MS OWSG MWD+IFR2+ Sag +Multi -Station Coned7/24/201912:55
Survey
Map
Map
Vertical
MD
Inc
Azl
TVD
TVDSS
+WS
+E/ -W
Northing
Easting
OLS
Section
(usft)
(1)
P)
(usft)
(usft)
(usft)
(usft)
(ft)
(ft)
(-/100')
(ft) Survey Tool Name
39.55
0.00
0.00
39.55
53.90
am
0.00
5,965,92649
349,577.80
000
0.00 UNDEFINED
124.66
0.42
205.38
124.66
51.21
-0.28
-0.13
5,965,926.21
349,577.66
0.49
0.27 GYD-GC-SS (1)
139.82
0.62
174.75
139.82
66.37
-0.41
-0.15
5,965,926.08
349,577.64
2.21
0.40 GYD-GCSS(1)
237.65
0.78
206.68
237.64
164.19
-1.54
440
5,965,924.96
349,577.37
0.42
1.50 GYD-GCSS(1)
8/14!1019 12:48:20PM
Page 2
COMPASS 5000. 14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference:
Well CD5-98
Project:
Westem North Slope
TVD Reference:
CD5-98 Actual Q 73.45usft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
Well:
CDS-98
North Reference:
True
Wellbore:
CD5.9811
Survey Calculation Method:
Minimum Curvature
Design:
CD5-9811
Database:
EDT 14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
Aid
TVD
TVDSS
+W -S
+E/ -W
Northing
Easting
DLS
Section
(11x11)
(1)
(°)
Nam
(11sft)
(usf)
(11611)
(ft)
Ift)
(°11001
(ft) Survey Tool Nam
325.13
0.77
196.48
325.11
251.66
-2.63
-6.83
5,965,923.87
349,576.91
0.16
2.57 GYD-GCSS(1)
422.09
0.22
319.42
422.07
348.62
-3.11
-1.14
5,965,923.40
349,576.60
0.94
3.03 GYD-GC-SS(1)
516.11
0.42
20.89
516.09
442.64
-2.66
-1.14
5,965,923.86
349,576.61
0.39
2.57 GYD-GC-SS(1)
614.06
0.66
344.04
614.04
640.59
-1.78
-1.16
5,965,924.73
349,576.60
0.42
1.69 GYD-GC-SS(1)
705.01
1.26
330.68
704.97
631.52
4).40
-1.80
5,965,926.12
349,576.00
0.70
0.28 GYD-GCSS(1)
802.88
3.78
319.35
802.74
729.29
2.98
4.42
5,965,929.56
349,573.44
2.61
3.28 MWD+IFR2+SAG+MS(2)
859.17
5.10
314.36
858.86
785.41
6.14
-7.42
5,965,932.78
349,570.50
2.44
5.63 MWD+IFR2+SAG+MS(2)
953.51
6.89
314.14
952.68
879.23
13.01
-14.48
5,965,939.79
349,563.58
1.90
-13.97 MIND+IFR2+SAG+MS (2)
1,047.90
8.73
315.35
1,046.19
972.74
22.05
-23.58
5,965,949.01
349,554.67
1.96
-23.61 MWD+IFR2+SAG+MS (2)
1,142.36
10.10
316.15
1,139.38
1,065.93
33.13
34.36
5,965,960.30
349,544.12
1.46
-35.39 MWD+IFR2+SAG+MS(2)
1,188.38
10.75
319.46
1,184.64
1,111.19
39.30
39.94
5,965,966.58
349,538.65
1.92
41.93 MWD+IFR2+SAG+MS(2)
1,236.25
12.06
321.20
1,231.56
1,158.11
46.59
45.98
5,965,973.99
349,532.77
2.83
-49.61 MWD+IFR2+SAG+MS(2)
1,332.06
13.28
320.74
1,325.04
1,251.59
62.91
59.21
5,966,990.57
349,519.86
1.28
-66.79 MWD+IFR2+SAG+MS(2)
1,426.06
14.41
320.81
1,416.30
1,342.85
80.34
-73.4
5,966,008.27
349,505.99
1.20
-85.15 MWD+IFR2+SAG+MS(2)
1,484.04
15.71
321.60
1,472.29
1,398.84
92.08
-82.87
5,965,020.20
349,4%.80
2.27
-97.51 GYD-GCSS(3)
1,555.92
17.21
320.91
1,541.22
1,46].77
107.96
-95.62
5,966,036.34
349,484.37
2.10
-114.22 GYD-GCSS (3)
1,651.07
19.56
319.98
1,631.51
1,558.06
131.09
-114.74
5,966,059.84
349,465.71
2.49
-138.59 GYD-GC-SS (3)
1,745.70
23.02
317.25
1,719.67
1,646.22
156.81
-137.50
5,966,086.01
349,443.48
3.80
-165.81 GYD-GC-SS(3)
1,802.20
24.66
318.74
1,771.35
1,697.90
173.79
-152.77
5,965,103.29
349,428.55
3.09
-183.78 MWD+IFR2+SAG+MS(4)
1,895.00
28.24
320.39
1,854.42
1780.97
205.27
-179.54
5,966,135.29
349,402.42
3.94
-217.01 MWD+IFR2+SAG+MS(4)
1,989.35
31.20
319.91
1,936.35
1,862.90
241.17
-209.52
5,966,171.79
349,373.17
3.15
-254.87 MWD+IFR2+SAG+MS(4)
2,083.43
34.M1
318.87
2,015.42
1,941.97
279.84
-242.70
5,966,211.11
349,340.77
3.45
-295.70 MWD+IFR2+SAG+MS (4)
2,178.35
37.00
318.83
2,092.50
2,019.05
321.54
-279.15
5,966,253.53
349,305.17
2.74
339.79 MWD+IFR2+SAG+MS(4)
2,214.38
38.02
319.41
2,121.08
2,047.63
338.13
-293.50
5,966,270.40
349,291.15
3.00
557.32 MWD+IFR2+SAG+MS(4)
2,286.00
39.28
319.68
2,177.01
2,103.56
372.16
-322.53
5,966,305.01
349,262.82
1.77
393.25 Interpolated Station
10 314"
2,305.63
39.62
319.75
2,192.17
2,118.72
381.68
330.59
5,966,314.68
349,254.95
1.77
403.29 MM -INC _ONLY (INC>10°)(5)
2,399.18
41.81
320.07
2,263.08
2,189.63
428.36
569.88
5,966,352.14
349,216.60
2.35
452.54 MWD+IFR2+SAG+MS(6)
2,493.82
44.39
319.65
2,332.17
2,258.72
477.79
411.57
5,966,412.39
349,175.91
2.74
506.69 MWD+IFR2+SAG+MS(6)
2,587.97
45.68
319.96
2,398.71
2,325.26
528.67
454.56
5,966,464.12
349,133.96
1.39
558.38 MWD+IFR2+SAG+MS(6)
2,681.83
46.92
320.64
2,463.55
2,390.10
580.88
497.90
5,966,517.19
349,091.67
1.42
{13.42 MWD+IFR2+SAG+MS (6)
2,776.94
48.11
320.40
2,527.79
2,454.34
635.02
542.50
5,966,572.20
349,048.17
1.26
-670.46 MWD+IFR2+SAG+MS(6)
2,870.86
50.10
320.41
2,589.27
2,515.82
689.72
587.74
5,966,627.79
349,004.04
2.12
-728.12 MWD+IFR2+SAG+MS(6)
2,964.88
53.01
321.34
2,647.72
2,574.27
746.85
534.19
5,966,685.83
348,958.74
3.19
-788.27 MWD+IFR2+SAG+MS (6)
3,068.09
54.31
321.59
2,702.96
2,629.51
805.58
-680.97
5,965,745.49
348,913.16
1.41
350.05 MWD+IFR2+SAG+MS (6)
3,152.29
55.88
320.68
2,756.86
2,683.41
865.72
-729.45
5,966,806.59
348,865.90
1.85
-913.36 MWD+IFR2+SAG+MS(6)
3,246.12
57.83
320.06
2,808.16
2,734.71
926.22
-779.56
5,966,868.07
348,817.01
2.15
-977.13 MWD+IFR2+SAG+MS(6)
3,340.41
59.70
318.98
2,857.05
2,783.60
987.54
531.90
5,966,930.42
348,765.92
2.21
-1,041.86 MWD+IFR2+SAG+MS(6)
3,435.03
61.65
318.78
2,903.39
2,829.94
1,049.68
-886.15
5,966,993.63
348,712.92
2.07
-1,107.55 MWD+IFR2+SAG+MS(6)
3,529.33
63.94
318.83
2,946.50
2,873.05
1,112.79
541.38
5,967,057.83
348,658.97
2.43
-1,174.27 MWD+IFR2+SAG+MS(6)
81142019 12:48:20PM Page 3 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference:
Well CD5-98
Project
Western North Slope
TVD Reference:
CDS-98 Actual @ 73.45usft (D25)
Site:
CDS Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
Wen:
CD5-98
North Reference:
True
Wellbore:
CD5-98L1
Survey Calculation Method:
Minimum Cun2ture
Design:
CD5-981-1
Database:
EDT 14 Alaska Production
Survey
8/1412019 12:48:20PM Page 4 COMPASS 5000.14 Build 85H
Map
Map
vertical
MD
Inc
AN
TVD
TVDS$
+N/-3
+E/ -W
Northing
Easgng
DIS
Section
(usft)
0
(•)
(usft)
(usft)
(unit)
(waft)
(ft)
pct
(°11001
(ft) Survey Tool Name
3,622.86
65.98
318.12
2,986.08
2,912.63
1,176.22
-997.56
5,967,122.37
348,604.08
2.29
-1,241.38 MWD+1FR2+SAG+MS(6)
3,717.05
68.56
317.84
3,022.48
2,949.03
1,240.75
-1,0M.71
5,967,188.05
348,547.24
2.75
-1,309.72 MWD+IFR2+SAG+MS(5)
3,811.58
69.54
316.87
3,056.28
2,982.83
1,305.69
-1,115.51
5,967,254.16
348,488.75
1.41
-1,378.57 MWD+IFR2+SAG+MS(6)
3,905.49
70.8
316.06
3,088.38
3,014.93
1,369.66
-1,176.30
5,967,319.34
348,429.26
1.29
-1,496.54 MWD+IFR2+SAG+MS(6)
3,999.76
72.95
316.82
3,117.95
3,044.50
1,434.52
-1,237.98
5,967,385.42
348,368.90
2.73
-1,515.44 MWD+IFR2+SAG+MS(6)
4,095.47
75.23
317.23
3,194.19
3,070.74
1,501.86
-1,300.71
5,967,454.00
348,307.53
2.42
-1,586.90 MWD+IFR2+SAG+MS(6)
4,189.18
76.17
317.47
3,167.33
3,093.88
1,568.65
-1,362.24
5,967,522.00
348,247.36
1.03
-1,657.72 MWD+IFR2+SAG+MS (6)
4,283.03
76.23
317.83
3,189.72
3,116.27
1,636.01
-1,423.63
5,967,590.57
348187.33
0.38
-1,729.10 MWD+IFR2+SAG+MS(6)
4,377.04
76.67
317.75
3,211.75
3,138.30
1,703.70
-1,485.04
5,967,659.47
348,127.30
0.48
-1,800.81 MWD+IFR2+SAG+MS(6)
4,470.39
76.51
317.59
3,233.40
3,159.95
1,770.83
-1,546.18
5,967,727.81
348,067.51
0.24
-1,871.95 MWD+IFR2+SAG+MS(6)
4,563.75
77.01
317.16
3,254.78
3,181.33
1,837.70
-1,607.73
5,967,795.89
348,007.33
0.70
-1,942.85 MWD+IFR2+SAG+MS(6)
4,657.68
77.11
317.23
3,275.79
3,202.34
1,904.79
-0,669.87
5,967,864.21
347,946.55
0.13
-2,014.01 MWD+IFR2+SAG+MS(6)
4,751.62
77.56
317.46
3,296.41
3,222.96
1,972.27
-1,732.04
5,967,932.92
347,885.75
0.53
-2,085.57 MWD+IFR2+SAG+MS(6)
4,846.27
77.53
316.61
3,316.82
3,243.37
2,039.90
-1,795.03
5,968,001.79
347,824.13
0.88
-2,157.33 MWD+IFR2+SAG+MS(6)
4,940.94
77.22
316.07
3,337.51
3,264.06
2,106.74
-1,858.80
5,968,069.88
397761.71
0.65
-2,228.35 MWD+IFR2+SAG+MS(6)
5,036.48
77.28
315.81
3,358.60
3,285.15
2,173.70
-1,923.60
5,968,138.12
347,698.27
0.27
-2,299.56 MWD+IFR2+SAG+MS(6)
5,130.57
77.89
314.40
3,378.83
3,305.38
2,238.79
-1,988.46
5,968,204.50
347,634.74
1.60
-2,368.92 MWD+IFR2+SAG+MS (6)
5,224.19
77.85
313.70
3,398.50
3,325.05
2,302.43
-2,054.24
5,968,269.4
347,570.24
0.73
-2,436.89 MWD+IFR2+SAG+MS(6)
5,318.00
77.61
313.53
3,418.4
3,394.99
2,365.66
-2,120.61
5,968,333.98
347,505.16
0.31
-2,504.49 MWD+IFR2+SAG+MS(6)
5,412.44
77.70
313.40
3,438.63
3,365.18
2,429.13
-2,187.57
5,968,398.77
347,439.49
0.16
-2,572.36 MWD+IFR2+SAG+MS(6)
5,505.87
77.70
313.04
3,458.53
3,385.08
2,491.64
-2,254.09
5,968,462.60
347,374.24
0.38
-2,639.26 MWD+IFR2+SAG+MS(6)
5.601.16
77.78
312.81
3,478.77
3,405.32
2,555.06
-2,322.28
5,968,527.36
347,307.35
0.25
-2,707.17 MWD+IFR2+SAG+MS(6)
5,695.29
77.30
312.68
3,499.08
3,425.63
2,617.44
-2,389.78
5,968,591.08
347,241.12
0.53
-2,774.00 MWD+IFR2+SAG+MS (6)
5,788.73
77.73
313.14
3,519.28
3,445.83
2,679.55
-2,456.59
5,968,654.52
347,175.56
0.67
-2,840.52 MWD+IFR2+SAG+MS(6)
5,882.96
78.0
314.58
3,539.09
3,465.64
2,743.39
-2,523.02
5,968,719.66
347,110.43
1.52
-2,908.72 MWD+IFR2+SAG+MS(6)
5,976.76
77.85
315.96
3,55B.71
3,485.26
2,808.55
-2,587.57
5,968788.10
347,047.21
1.45
-2,978.13 MWD+IFR2+SAG+MS(6)
6,071.62
77.56
318.11
3,578.91
3,505.46
2,876.37
-2,650.73
5,968,855.16
346,985.42
2.24
-3,050.08 MWD+IFR2+SAG+MS (6)
6,164.91
78.13
318.41
3,598.55
3,525.10
2,944.42
-2,711.45
5,968,924.41
346,926.08
0.69
3,122.11 MM+IFR2+SAG+MS(6)
6,257.72
77.75
318.75
3,617.95
3,544.50
3,012.48
-2,771.49
5,968,993.66
346,867.42
0.54
3,194.10 MWD+IFR2+SAG+MS(6)
6,352.23
77.88
320.00
3,637.90
3,564.45
3,082.59
-2,831.64
5,969,064.96
346,808.69
1.30
3,268.14 MWD+IFR2+SAG+MS (6)
6,446.66
77.64
321.39
3,657.92
3,584.47
3,154.00
-2,890.10
5,959,137.51
346,751.68
1.6
3,343.36 MWD+IFR2+SAG+MS(6)
6,540.88
77.62
321.02
3,678.18
3,604.73
3,225.71
-2,947.75
5.969.210.36
346,695.4B
0.40
-3,418.83 MWD+IFR2+SAG+MS(6)
6,635.25
77.53
319.87
3,698.57
3,625.12
3,296.75
-3,006.42
5,969,282.56
346,638.24
1.19
-3,493.70 MWD+IFR2+SAG+MS(6)
6,729.37
77.40
319.16
3,718.99
3,645.54
3,366.63
3,066.07
5,969,353.62
346,580.01
0.75
3,567.48 MWD+IFR2+SAG+MS(6)
6,824.50
78.04
319.21
3,739.23
3,665.78
3,436.98
-3,126.83
5,969,425.16
346,520.68
0.67
-3,641.80 MWD+IFR2+SAG+MS (6)
6,917.66
77.69
319.64
3,758.81
3,685.36
3.506.16
3,186.07
5,969,495.51
346,462.84
0.59
-3,714.85 MWD+IFR2+SAG+MS(6)
7,012.95
77.94
320.06
3,778.92
3,705.47
3,577.35
-3,246.13
5,969,567.89
346,404.23
0.50
-3,789.97 MWD+IFR2+SAG+MS(6)
7,107.18
77.88
320.27
3,798.66
3,725.21
3,648.11
3,305.15
5,969,639.80
346,346.64
0.23
3,864.57 MWD+IFR2+SAG+MS (6)
7,201.50
7T97
319.34
3,818.45
3,745.00
3,718.78
3,364.87
5,969,711.66
346,288.35
0.97
-3,939.15 MWD+IFR2+SAG+MS(6)
7,296.23
78.09
319.04
3,838.04
3,764.59
3,788.70
-3,425.24
5,969,782.76
348229.40
0.34
4,013.01 MWD+IFR2+SAG+MS(6)
8/1412019 12:48:20PM Page 4 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference:
Well CD5-98
Project
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usg (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usR (D25)
Well:
CD5-98
North Reference:
True
Wellbore:
CD5-981-1
Survey Calculation Method:
Minimum Curvature
Design:
C05-981.1
Database:
EDT 14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
Asl
TVD
TVDSS
+NIS
+FJ -W
Northing
Easting
DLS
Section
(Daft)
(*)
(1)
(usft)
(us(t(
(weft)
("M
(ti
(ft)
r/1007
(ft) Survey Tool Name
7,389.54
78.05
318.72
3,857.33
3,783.88
3,857.48
3,485.28
5,969,852.72
346,170.75
0.34
4,085.71 1AWD+IFR2+SAG+MS(6)
7,482.56
77.99
318.02
3,876.64
3,803.19
3,925.49
3,545.73
5,969,921.93
346,111.68
0.74
-0,157.68 MWD+IFR2+SAG+MS(6)
7,576.69
78.00
317.46
3,896.21
3,822.76
3,993.63
3,607.65
5,969,991.29
346,051.15
0.58
4,229.88 MWD+IFR2+SAG+MS(6)
7,670.93
77.99
317.58
3,915.82
3,842.37
4,061.61
3,669.90
5,970,060.50
345,990.28
0.13
4,301.94 MWD+IFR2+SAG+MS(6)
7,765.87
77.96
317.96
3,935.60
3,862.15
4,130.37
3,732.31
5,970,130.49
345,929.26
0.39
4,374.78 MWD+IFR2+SAG+MS(6)
7,858.07
77.90
317.95
3,954.88
3,881.43
4,197.33
3,792.69
5,970,198.64
345,870.24
0.07
4,445.69 MWD+IFR2+SAG+MS(6)
7,952.49
77.87
318.24
3,974.69
3,901.24
4,266.03
3,854.35
5,970,268.56
345,809.97
0.30
4,518.44 MWD+IFR2+SAG+MS(6)
8,046.64
78.15
318.77
3,994.25
3,920.80
4,335.01
3,915.37
5,970,338.75
345,750.35
0.63
4,591.41 MWD+IFR2+SAG+MS(6)
8,140.93
77.93
319.07
4,01379
3,940.34
4,404.55
3,975.98
5,970,409.47
345,691.15
0.39
4,664.91 MWD+IFR2+SAG+MS(6)
8,235.96
78.02
318.48
4,033.59
3,960.14
4,474.45
4,037.23
5,970,480.59
345,631.31
0.61
4,738.82 MWD+IFR2+SAG+MS(6)
8,330.25
77.93
317.54
4,053.23
3,979.78
4,543.D0
4,098.93
5,970,550.35
345,571.01
0.98
4,811.40 MMD+IFR2+SAG+MS (6)
8,425.30
77.93
317.08
4,073.11
3,999.66
4,611.32
4,161.95
5,970,619.91
345,509.37
0.47
4,883.85 MWD+IFR2+SAG+MS(6)
8,519.32
78.08
316.21
4,092.65
4,019.20
4,678.19
4,225.08
5,970,688.03
345,447.59
0.92
4,954.86 MWD+IFR2+SAG+MS(6)
8,613.45
78.15
317.04
4,112.04
4,038.59
4,745.14
4,288.34
5,970,756.23
345,385.69
0.87
5,025.97 MWD+IFR2+SAG+MS(6)
8,706.45
78.05
317.38
4,131.21
4,057.76
4,811.92
4,350.16
5,970,824.23
345,325.23
0.37
5,096.80 MWD+IFR2+SAG+MS(6)
8,803.10
77.99
317.50
4,151.27
4,077.82
4,881-56
4.414.11
5,970,895.13
345,262.69
0.14
5,170.63 MWD+IFR2+SAG+MS(6)
8,897.78
78.09
317.82
4,170.90
4,037.45
4,950.02
4,476.49
5,970,964.83
345201.70
0.35
5,243.18 MW0+1FR2+SAG+MS(6)
6,991.99
77.81
317.94
4,190.56
4,117.11
5,018.36
4,538.29
5,971,034.38
345,141.29
0.32
5,315.57 MWD+IFR2+SAG+MS (6)
9,083.23
77.91
316.94
4,209.75
4,136.30
5,084.06
4,598.62
5,971,101.28
345,082.29
1.08
5,385.22 MWD+IFR2+SAG+MS(6)
9,176.80
77.93
315.83
4,229.33
4,155.88
5,150.31
4.661.73
5,971,168.76
345,020.52
1.16
5,455.61 MWD+IFR2+SAG+MS(6)
9,271.97
77.97
314.44
4,249.20
4,175.75
5,216.27
4,727.39
5,971,236.03
344,956.21
1.43
5,525.89 MND+IFR2+SAG+MS(6)
9,365.83
78.00
314.4
4,268.74
4,195.29
5,280.78
4792.71
5,971,301.2
344,892.20
0.42
5,594.69 MWD+1FR2+SAG+MS(6)
9,460.00
78.05
315.85
4,288.28
4,214.83
5,346.31
4,857.45
5,971,368.63
344,828.78
1.05
5,664.47 MWD+IFR2+SAG+MS(6)
9,554.99
78.00
317.25
4,307.99
4,234.54
5,413.76
4,921.36
5,971,437.35
344,766.25
1.44
-5,736.12 MND+IFR2+SAG+MS (6)
9,648.83
77.72
318.47
4,327.73
4,254.28
5,481.79
4,982.91
5,971,506.59
344,708.07
1.31
5,808.18 MWD+IFR2+SAG+MS (6)
9,742.94
77.84
318.46
4,347.65
4,274.20
5,550.64
5,043.90
5,971,576.64
344,646.48
0.13
-5,881.02 MND+IFR2+SAG+MS(6)
9,835.4
78.00
318.37
4,%7.00
4,293.55
5,618.30
5,103.93
5,971,645.48
344587.82
0.20
5.952.60 MWD+IFR2+SAG+MS(6)
9,929.46
75.50
317.61
4,388.55
4,315.10
5,686.29
5,165.18
5,971,714.69
344,527.96
2.77
5,024.61 MND+IFR2+SAG+MS (6)
10,023.45
71.54
316.00
4,415.21
4,341.76
5,751.99
5,226.84
5,971,781.60
344,467.62
4.52
5,094.35 MN4D+IFR2+SAG+MS(6)
10,118.37
68.86
315.29
4,447.36
4,373.91
5,815.85
5,289.27
5,971,846.69
344406.49
2.91
5,162.31 MWD+IFR2+SAG+MS(6)
10,213.23
65.40
313.80
4,484.23
4,410.78
5,877.15
5,351.54
5,971,909.23
344,345.47
3.92
5,227.71 MND+IFR2+SAG+MS (6)
10,306.42
61.99
312.87
4,525.52
4,452.07
5,934.48
5,412.29
5,971,967.76
344285.88
3.77
5,289.04 MWD+IFR2+SAG+MS(6)
10,401.52
58.30
311.52
4,572.85
4,499.40
5,989.88
5,473.37
5,972,024.37
344,225.93
4.07
5,348.47 MND+IFR2+SAG+MS (6)
10,495.63
54.63
310.30
4,624.83
4,551.38
6,041.26
5,532.63
5,972,076.92
344,167.72
4.05
5,403.76 MN4D+IFR2+SAG+MS (6)
10,589.85
49.28
308.55
4,682.88
4,609.43
6,088.40
5,589.89
5,972,125.19
344,111.41
5.86
5,464.68 MWD+IFR2+SAG+MS(6)
10,683.38
46.54
307.50
4,745.57
4,672.12
6,131.16
5,644.65
5,972,169,04
344,057.63
3.05
5,501.07 MND+IFR2+SAG+MS(6)
10,776.99
43.85
307.26
4,811.53
4,738.08
6,171.48
5,697.32
5,972,210.41
344005.68
2.88
5,544.89 MWD+IFR2+SAG+MS(6)
10,871.87
39.55
306.75
4,882.36
4,808.91
6,209.47
5,747.70
5,972,249.39
343,956.07
4.55
5,586.22 MND+IFR2+SAG+MS (6)
10,965.76
34.94
305.68
4,957.08
4,883.63
6,243.06
5,793.52
5,972,283.89
343,910.94
4.96
5,622.84 MW0+1FR2+SAG+MS(6)
11,065.49
30.81
304.74
5,040.82
4,967.37
6,274.28
5,837.72
5,972,315.99
343,867.37
4.17
5,657.00 MWD+IFR2+SAG+MS(6)
8.04/2019 12:48:20PM Page 5 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference:
Well CD5-98
Project:
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CDS-98 Actual @ 73.45usft (D25)
Well:
CD5-98
North Reference:
True
Wellbore:
CD5-9817
Survey Calculation Method:
Minimum Curvature
Design:
CDS-980
Database:
EDT 14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N(S
+El -W
Northing
Easting
DLS
Section
(usf)
(1)
r)
(usft)
(uslt)
(usft)
(usft)
(ft)
(ft)
(°/1001
(ft) Survey Tool Name
11,164.19
28.22
304.81
5,118.00
5,044.55
6,299.20
5,873.61
5,972,341.62
343,83"9
2.92
5,684.31 MWD+IFR2+SAG+MS(6)
11,246.05
24.24
304.52
5,200.40
5,126.95
6,322.30
5,907.00
5,972,365.38
348,799.08
4.33
6,709.62 MWDAFR2+SAG+MS(6)
11,343.39
20.69
303.53
5,290.32
5,216.87
6,343.13
5,937.80
5,972,386.82
343,768.70
3.67
6,732.50 MWD+IFR2+SAG+MS(6)
11,437.88
17.83
303.36
5,379.52
5,306.07
6,360.30
5,963.81
5,972,404.51
343,743.05
3.03
6,751.41 MWD+IFR2+SAG+MS(6)
11,531.69
14.80
301.65
5,469.54
5,396.09
6,374.49
5,986.01
5,972,419.14
343,721.14
3.27
6,767.07 MWD+IFR2+SAG+MS(6)
11,625.57
10.83
293.32
5,561.07
5,487.62
6,384.28
5,004.32
5,972,429.30
343,703.02
4.65
6,778.08 MWD+IFR2+SAG+MS(6)
11,719.80
7.66
280.62
5,654.07
5,580.62
6,368.94
5,018.63
5,972,434.24
343,688.81
3.98
6,783.71 MWD+IFR2+SAG+MS(6)
11,815.53
6.93
263.41
5,749.04
5,675.59
6,389.46
6,030.64
5,972,435.0
343,676.82
2.40
5,785.04 MWD+IFR2+SAG+MS(6)
11,909.98
6.14
222.21
5,842.93
5,769.48
6,385.05
6,039.70
5,972,430.78
343,667.67
4.92
6,781.27 MWD+IFR2+SAG+MS(6)
12,003.10
7.28
196.79
5,935.43
5,861.98
6,375.72
6,04475
5,972,421.55
343,662.43
3.38
6,772.30 MWD+IFR2+SAG+MS(6)
12,094.75
7.94
181.99
6,026.28
5,952.83
6,363.83
6.046.65
5,972,409.70
343,660.30
2.25
6,760.57 MWD+1FR2+SAG+MS(6)
12,188.55
9.17
172.33
6,119.04
6,045.59
6,349.95
6.45.87
5,972,395.81
343,660.79
2.01
5,746.66 MWD+IFR2+SAG+MS(6)
12,283.55
13.04
165.19
6,212.24
6,138.79
6.332.08
6,042.12
5,972,377.87
343,66,IA9
4.32
6,728.58 MWD+IFR2+SAG+MS(6)
12,377.11
14.69
162.35
6,303.08
6,229.63
6,310.57
6,035.83
5,972,356.23
343,670.05
1.91
5,706.69 MWD+IFR2+SAG+MS (6)
12,470.49
17.85
159.87
6,392.71
6,319.26
6,285.84
6,027.31
5,972,331.34
343,678.07
3.46
6,681.44 MWD+IFR2+SAG+MS(6)
12,564.00
21.27
157.28
6,480.81
6,407.36
6,256.73
6,015.82
5,972,302.01
343,688.97
3.77
5,651.61 MWD+IFR2+SAG+MS(6)
12,650.04
24.88
154.15
6,569.15
6,495.70
6,222.47
6,000.28
5,972,267.45
343,703.82
3.97
6,616.37 MWD+IFR2+SAG+MS(6)
12,753.80
28.81
150.67
6,652.80
6,579.35
6,185.01
5,980.60
5,972,229.60
343,722.74
4.51
5,577.66 MWD+IFR2+SAG+MS(6)
12,847.33
33.01
149.04
6,733.03
6,659.58
6,143.49
5,955.45
5,972,187.61
343,746.06
4.58
6,534.60 MWD+IFR2+SAG+MS(6)
12,941.37
35.85
148.03
6,810.59
6,737.14
6,098.16
5,928.68
5,972,141.73
343,772.91
3.08
5,487.48 MWD+IFR2+SAG+MS(6)
13,036.23
40.07
145.64
6,885.37
6,811.92
6.49.36
5.896.73
5,972,092.31
343,803.88
4.71
5,436.62 MWD+IFR2+SAG+MS(6)
13,131.58
43.23
144.90
6,956.60
6,883.15
5,997.30
6,860.62
5,972,039.54
343,838.93
3.35
5,382.22 MWD+IFR2+SAG+MS(6)
13,225.49
46.57
143.66
7,023.12
6,949.67
5,943.50
5,821.91
5,971,984.98
343,876.55
3.05
5,325.91 MWD+IFR2+SAG+MS(6)
13,318.79
50.54
142.91
7,064.86
7,011.41
5,887.46
5,780.10
5,971,928.12
343,917.23
4.30
5,267.16 MWD+IFR2+SAG+MS(6)
13,414.06
53.45
143.10
7,143.51
7,070.06
5,827.51
5,734.93
5,971,857.28
343,961.18
3.06
5,204.27 MWD+IFR2+SAG+MS(6)
13,509.41
57.05
142.55
7,197.83
7,124.38
5,765.09
5,687.59
5,971,803.93
344,007.27
3.89
5,138.77 MWD+IFR2+SAG+MS(6)
13,603.25
60.11
143.08
7,246.73
7,173.28
5,701.28
5,639.19
5,971,739.17
344,054.37
3.26
6,071.82 MWD+IFR2+SAG+MS(6)
13,697.21
63.66
143.52
7,291.00
7,217.55
5,634.85
5,589.67
5,971,671.76
344,102.54
3.80
5,002.17 MWD+IFR2+SAG+MS (6)
13,791.37
67.58
143.82
7,329.86
7,256.41
5,565.76
5,538.88
5,971,601.68
344,151.94
4.17
5,929.79 MWD+IFR2+SAG+MS(6)
13,887.19
70.71
144.14
7,363.97
7,290.52
5,493.35
5,486.23
5,971,528.23
344,203.12
3.28
5,853.96 MWD+IFR2+SAG+MS (6)
13,981.66
73.42
143.76
7,393.06
7,319.61
5,420.69
5,433.34
5,971,454.53
344,254.54
2.89
5,777.87 MWD+IFR2+SAG+MS(6)
14,075.51
75.24
144.89
7,418.40
7,344.95
5,347.29
5,380.65
5,971,380.09
344,305.75
2.26
5,701.05 MWD+IFR2+SAG+MS(6)
14,120.00
76.27
144.39
7,429.35
7,355.90
5,312.12
5,355.69
5,971,349.44
344329.99
2.56
-5,664.27 Interpolated Station
7Sle"
14134.00
77.65
145.81
7,432.51
7,359.05
5,300.93
5,347.89
5,971,333.10
394,337.57
14.01
5,652.58 MM -INC _ ONLY (INC>10°)(7)
14,154.41
76.86
145.71
7,437.01
7,363.56
5,284.48-5,336.69
5,971,316.42
344,348.44
3.95
5,635.40 MWD -INC ONLY(7NC>10°)(7)
14,248.84
81.19
145.24
7,454.98
7,381.53
5,208.12
5,284.16
5,971,239.03
344399.43
4.61
5,555.69 MWD-INC_ONLY (INC>10°)(7)
14,344.65
84.98
144.78
7,466.52
7,393.07
5,130.22
5,229.63
5,971,160.06
344,452.38
3.98
5,474.21 MWD-INC_ONLY(INC>10°)(7)
14,439.17
89.98
144.33
7,470.67
7,397.22
5,053.31
5,174.88
5,971,052.08
344505.57
5.31
5.393.76 MWD+IFR2+SAG+MS(8)
14,534.05
94.93
142.94
7,465.61
7,393.16
4,977.00
5,118.70
5,971,009.66
344560.21
5.42
5,313.80 MWD+IFR2+SAG+MS(e)
8/142019 12:48.20PM Page 6 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference: Well CD5-98
Project:
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usft (D25)
Site:
CDS Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
Well:
CDS-98
North Reference:
True
Wellbore:
CD5-981.1
Survey Calculation
Method:
Minimum
Curvature
Design:
CD5-9811
Database:
EDT
14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
Ail
TVD
TVDSS
+N/ -S
+E/ -W
Northing
Easting
OLS
Section
(usfq
r)
0
(usft)
(usft)
(waft)
(usft)
(ft)
(1q
(°/1001
(ft) Survey Tool Name
14,629.21
95.97
142.84
7,457.57
7,384.12
4,901.46
5.61.54
5,970,928.W
344,615.64
1.10
5,234.54 MWD -INC ONLY(INC,101)(9)
14,724.28
95.99
142.74
7,47.87
7,374.22
4,826.16
5,004.36
5,970,851.57
344,671.49
0.11
5,155.52 MWD+IFR2+SAG+MS (10)
14,818.94
91.98
142.80
7,441.09
7,367.64
4,750.98
-4,947.24
5,970,775.27
344,727.09
4.24
5,076.64 MWD+IFR2+SAG+MS (10)
14,913.59
91.90
142.13
7,437.88
7,364.43
4,675.97
4,889.61
5,970,699.13
344,783.20
0.71
4,997.88 MWD+IFR2+SAG+MS(10)
15,009.28
89.77
143.80
7,436.49
7,363.04
099.60
4,831.99
5,970,821.62
344,839.28
2.83
491776 MWD+IFR2+SAG+MS(10)
15,104.19
90.00
146.57
7,436.68
7,363.23
4,521.69
4,777.81
5,970,542.64
344891.89
2.93
4,836.39 MWD+IFR2+SAG+MS(10)
15,199.36
90.02
145.79
7,436.66
7,363.21
4,442.62
4,724.84
5,970,462.54
344,943.26
0.82
4,753.86 MWD+IFR2+SAG+MS(10)
15,293.36
90.00
149.52
7,436.65
7,363.20
4,363.22
4,674.56
5,970,382.15
344,991.94
3.97
4,671.22 MWD+IFR2+SAG+MS(10)
15,388.18
89.53
153.71
7,437.04
7,363.59
4,279.82
4,629.49
5,970,297.87
345,035.32
4.45
4,584.94 MWD+IFR2+SAG+MS(10)
15,483.18
89.54
155.83
7,437.81
7,364.36
4,193.89
4,589.00
5,970,211.15
345,074.08
2.23
4,496.46 MWD+IFR2+SAG+MS(10)
15,578.46
89.62
157.17
7,438.51
7,365.00
4,106.52
4,551.01
5,970,123.04
345,110.31
1 A
4,40070 MWD+IFR2+SAG+MS(10)
15,673.48
89.57
155.09
7,439.18
7,365.73
4,019.63
4,512.56
5,970,035.41
345,147.00
2.19
4,317.0 MWO+IFR2+$AG+MS (10)
15,768.09
89.67
152.93
7,439.80
7,366.35
3,934.60
4,471.10
5,969,949.57
345,186.75
2.29
4,229.74 MWD+IFR2+SAG+MS(10)
15,862.94
90.34
152.68
7,439.80
7,366.35
3,850.23
4,427.76
5,969,864.36
345,228.39
0.75
4,142.62 MWD+IFR2+SAG+MS(10)
15,958.44
89.96
153.35
7,439.55
7,366.10
3,765.13
4,384.42
5,969,778.41
345,270.01
0.81
4,054.77 MWD+IFR2+SAG+MS(10)
16,053.13
91.08
152.22
7,438.69
7,365.24
3,680.93
4,341.12
5,969,693.37
345,311.61
1.68
3,967.82 MWD+IFR2+SAG+MS(10)
16,147.22
90.53
151.81
7,437.37
7,363.92
3,597.85
4,296.97
5,969,609.43
345,354.08
0.73
-3,881.93 MWD+IFR2+SAG+MS (10)
16,243.39
90.34
153.08
7,436.63
7,%3.18
3,512.59
4.252.49
5,969,523.30
345,396.85
1.34
41,793.84 MWD+IFR2+SAG+MS(10)
16,335.05
89.94
152.83
7,436.41
7,362.96
3,430.96
4,210.81
5,969,440.85
345,436.88
0.51
-3,709.56 MWD+IFR2+SAG+MS(10)
16,433.28
90.02
153.40
7,436.45
7,363.00
3,343.34
4,166.39
5,969,352.38
345,479.53
0.59
3,619.12 MWD+IFR2+SAG+MS(10)
16,525.42
90.02
150.44
7,435.41
7,362.96
3,262.06
4,123.03
5,969,270.24
345,521.25
3.21
-3,535.07 MWD+IFR2+SAG+MS(10)
16,622.76
89.99
151.63
7,436.40
7,%2.95
3,176.90
4,075.89
5,969,184.16
345,566.67
1.22
3,446.90 MWD+IFR2+SAG+MS (10)
16,716.99
89.93
150.42
7,436.47
7,363.02
3,094.6
4,030.24
5,969,100.84
345,610.66
1.29
-3,361.55 MWD+IFR2+SAG+MS (10)
16812.02
89.72
150.39
7,436.76
7,363.31
3,011.83
-3,983.31
5,969,017.29
345,655.92
0.22
3,275.92 MWD+IFR2+SAG+MS(10)
16,908.23
89.26
148.17
7,437.62
7,364.17
2,929.13
-3,934.17
5,968,933.62
345,703.39
2.36
-3,190.07 MWD+IFR2+SAG+MS(10)
17,002.01
89.34
148.70
7,438.76
7,365.31
2,849.23
-3,885.08
5,968,852.76
345,750.87
0.57
41,107.01 MWD+IFR2+$AG+MS(10)
17,096.02
89.38
148.23
7,439.81
7,366.36
2,769.11
-3,835.91
5,968,771.68
345,798.41
0.50
-3,023.73 MWD+IFR2+SAG+MS (10)
17,193.16
88.57
150.40
7,441.55
7,368.10
2,685.59
-3,785.35
5,968,687.19
345,846.29
2.38
-2,937.03 MWD+IFR2+SAG+MS(10)
17,287.62
88.56
151.66
7443.92
7,370.47
2,602.98
-3,740.62
5,968,603.68
345,890.36
1.33
-2,851.50 MWD+IFR2+SAG+MS(10)
17,382.56
90.01
156.07
7,445.10
7,371.65
2,517.77
-3,698.81
5,968,517.67
345,930.44
4.89
-2.763.65 MWD+IFR2+SAG+MS(10)
17,477.87
89.74
161.88
7,445.31
7,371.86
2,428.85
3,664.63
5,968,428.08
345,962.83
6.10
-2,672.60 MWD+IFR2+SAG+MS(10)
17,573.87
89.88
163.98
7,445.63
7,372.18
2,337.08
3,636.45
5,968,335.77
345,989.16
2.19
-2,579.13 MWD+IFR2+SAG+MS(10)
17,668.24
86.06
160.01
7,448.97
7,375.52
2,247.42
-3,607.32
5,966245.55
346,016.50
5.84
-2,487.70 MWD+IFR2+SAG+MS(10)
17760.11
85.14
157.76
7,455.02
7,382.57
2,161.98
3,574.32
6968,159.48
346047.77
2.64
-2,400.21 MWD+IFR2+SAG+MS(10)
17,856.82
84.17
151.58
7,465.04
7,391.59
2,074.99
3,533.15
5,968,071.69
346,087.19
6.44
-2,310.62 MWD+IFR2+SAG+MS (1 D)
17,951.38
86.19
148.47
7,472.99
7,399.54
1,993.38
3,486.08
5,967,989.16
346,132.61
3.91
-2,226.00 MWD+IFR2+SAG+MS(10)
18,047.75
89.78
146.84
7,476.37
7,402.92
1,912.03
-3,434.56
5,967,906.80
346182.49
4.09
-2,141.33 MWD+IFR2+SAG+MS(10)
16143.31
89.57
146.91
7,476.92
7,403.47
1,832.00
3,382.34
5,967,825.75
346,233.09
0.23
-2,057.93 MWD+IFR2+SAG+MS(10)
18,238.63
89.96
148.25
7,477.31
7,403.86
1,751.54
-3,331.24
5,967,744.28
346282.56
1.46
-1,974.18 MWD+IFR2+SAG+MS(10)
18,333.19
89.60
148.44
7,477.67
7,404.22
1,671.05
-3,281.61
5,W7,652.82
346,330.56
0.43
-1,890.50 MWD+IFR2+SAG+MS(10)
81142019 12:48.20PM
Page 7
COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversicn
Local Coordinate Reference:
Well CD5-98
Pmjsct:
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usft (D25)
Site:
CD5 Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
MN:
CDS-98
North Reference:
True
Wellbore:
CD5-981-1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-981-1
Database:
EDT 14 Alaska Production
Survey
Map
Mop
Vertical
MD
Inc
Azl
TVD
TVDSS
+WS
+E1 -W
Northing
Easting
OLS
Section
(usft)
(1)
P)
(usft)
lust"
(usft)
(usf"
(t"
(ft)
(°/100')
(ft) Survey Tool Name
18,427.45
89.70
149.34
7,478.25
7,404.80
1,590.35
-3,232.91
5,967,581.17
346,377.63
0.98
-1,806.67 MWDHFR2+SAG+MS(10)
18,523.06
90.79
149.13
7,477.84
7,404.39
1,508.20
-3,184.01
5,967,498.06
346,424.88
1.16
-1,721.38 MWDNFR2+SAG+MS(10)
18,617.37
90.63
149.10
7,476.67
7,403.22
1,427.27
-3,135.60
5,967,416.18
346,471.65
0.17
-1,637.34 MWD -INC -ONLY (INC,10') (11)
18,713.94
90.72
149.07
7,475.53
7,402.08
1,344.42
.7,085.99
5,967,332.36
346,519.59
0.10
-1,551.31 MWD+IFR2+SAG+MS(12)
18,8W.72
90.68
150.15
7,474.37
7,400.92
1,262.67
3,038.05
5,967,249.67
346,565.88
1.14
-1,466.49 MWD+IFR2+SAG+MS (12)
18,903.89
89.83
149.32
7,473.95
7,400.50
1,180.48
-2,990.08
5,967,166.54
346,612.19
1.25
-1,381.22 MWD+IFR2+SAG+MS(12)
18,998.34
88.66
148.97
7,475.19
7,401.74
1,099.40
-2,941.65
5,967,084.52
346,658.99
1.29
-1,297.04 MWD+IFR2+SAG+MS(12)
19,093.51
88.68
149.06
7,477.40
7,403.95
1,017.84
-2,892.67
5,967,001.99
346,706.32
0.10
-1,212.33 MWD+IFR2+SAG+MS(12)
19,168.28
88.72
149.36
7,479.55
7,406.10
936.45
-2,844.17
5,966,919.65
346,753.18
0.32
-1,127.82 MWD+IFR2+SAG+MS(12)
19,283.51
88.75
151.42
7,481.65
7,408.20
853.68
-2,797.13
5,966,835.96
346,798.54
2.16
-1,042.05 MWD+IFR2+SAG+MS (12)
19,378.90
88.78
156.06
7,483.71
7,410.26
768.17
-2,754.94
5,966,749.64
346,839.00
4.86
-953.87 MWD+1FR2+SAG+MS(12)
19,474.90
88.90
157.95
7,485.66
7,412.21
679.82
-2,717.45
5,966,660.56
346,874.72
1.97
-863.18 MWD+IFR2+SAG+MS(12)
19,569.65
68.68
156.26
7,487.66
7,414.21
592.56
-2,680.60
5,9W572.59
346,909.81
1.80
-773.61 MWD+IFR2+SAG+MS(12)
19,664.73
88.53
152.25
7,489.97
7,416.52
506.96
-2,639.32
5,966,486.18
346,999.36
4.22
-685.40 MWD+IFR2+SAG+MS(12)
19,759.28
89.11
147.79
7,491.92
7,418.47
425.10
-2,592.10
5,965,403.40
346,994.93
4.76
-600.51 MWD+IFR2+SAG+MS(12)
19,853.21
89.21
148.65
7,493.30
7,419.85
345.26
-2,542.63
5,966,322.59
347,042.78
0.92
-5517.49 MWD+IFR2+SAG+MS(12)
19,949.68
88.85
147.24
7,494.93
7,421.48
263.52
-2,491.44
5,966,239.84
347,092.32
1.51
-432.45 MWD+IFR2+SAG+MS(12)
20,044.55
88.92
142.32
7,496.78
7,423.33
186.05
-2,4W.75
5,966,161.30
347,145.44
5.19
]51.44 MWD+IFR2+SAG+MS(12)
20,138.74
89.11
141.37
7,498.40
7,424.95
112.00
-2,378.57
5,966,086.10
347,202.12
1.03
-273.60 MWD+IFR2+SAG+MS (12)
20,234.79
88.98
145.94
7,500.00
7,426.55
34.66
-2,321.67
5,966,007.65
347,257.6
4.76
-19258 MWD+IFR2+SAG+MS(12)
20,328.15
89.69
150.99
7,501.08
7,427.63
-04.88
-2,272.86
5,965,927.15
347,304.66
5.46
-109.90 MWD+IFR2+SAG+MS(12)
20.424.22
89.6
150.85
7,501.80
7,428.35
-128.84
-2,226.17
5,965,842.28
347,349.66
0.28
-2Z% MWD+IFR2+SAG+MS(12)
20,519.64
9020
148.16
7,502.08
7,428.63
-211.05
-2,177.76
5,965,759.12
347,396.42
2.92
62.36 MWD+IFR2+SAG+MS(12)
20,614.89
90.35
163.28
7,501.62
7,428.17
-294.10
-2,131.19
5,965,675.16
347,441.31
5.38
148.39 MWD+IFR2+SAG+MS(12)
20,708.54
91.11
154.41
7,500.43
7,426.98
378.15
-2,089.91
5,965,590.31
347,480.89
1.45
235.05 MWD+IFR2+SAG+MS(12)
20,804.19
90.36
152.69
7,499.20
7,425.75
-463.78
-2,47.31
5,965,503.85
347,521.76
1.96
323.38 MWD+IFR2+SAG+MS(12)
20,898.84
89.80
149.90
7,499.07
7,425.62
596.79
-2,001.86
5,965,419.95
347,565.54
3,1
409.29 MWD+IFR2+SAG+MS(12)
20,995.71
89.88
150.28
7,499.34
7,425.89
-630.76
-1,953.55
5,965,335.04
347,612.15
0.40
496.35 MWD+IFR2+SAG+MS(12)
21,090.96
90.12
151.94
7499.34
7,425.89
-714.15
-1,907.54
5,965,250.75
347,656.48
1.76
582.68 MWD+IFR2+SAG+MS(12)
21,184.25
90.51
155.97
7,498.83
7,42538
-797.95
-0,866.58
5,965,166.15
347,695.74
4.39
669.07 MWD+IFR2+SAG+MS(12)
21,279.22
90.64
156.32
7,497.87
7,424.42
-884.80
-1,828.18
5,965,078.56
347,732.90
0.39
756.34 MWD+IFR2+SAG+MS(12)
21,373.98
90.75
154.86
7,496.72
7,423.27
A71.09
-1,789.04
5,964,991.51
347,769.80
1.52
897.09 MM+IFR2+SAG+MS(12)
21,470.63
90.53
156.0
7,495.64
7,422.19
-1,059.12
-1,749.17
5,964,902.70
397807.89
1.59
937.63 MWD+IFR2+SAG+MS(12)
21,564.36
90.68
156.77
7,494.65
7,421.20
-1,145.13
-1,711.93
5,964,815.97
347,893.40
0.43
1,025,8 MWD+IFR2+SAG+MS(12)
21,659.52
90.67
159.09
7,493.53
7,420.08
-1,233.30
-1,676.18
5,964,727.10
347,877.38
2.44
1,116.38 MWD+IFR2+SAG+MS (12)
21,754.79
90.72
158.67
7,492.38
7,418.93
-1,322.17
-1,641.85
5,964,637.57
347,909.91
0.44
1,207.37 MWD+IFR2+SAG+MS(12)
21,850.16
89.%
160.19
7,491.81
7,418.36
-1,411.45
-1,608.35
5,964,547.64
347,941.62
1.78
1,298.73 MWD+IFR2+SAG+MS(12)
21,945.64
90.48
160.12
7,491.44
7,417.99
-1,501.26
-1,575.93
5,964,457.21
347,972.23
0.55
1,390.54 MWD+IFR2+SAG+MS(12)
22,041.05
90.63
162.56
7,490.52
7,417.07
-1,591.65
-1,545.41
5,964366.24
348,000.93
2.56
1,482.79 MWD+IFR2+SAG+MS (12)
22,135.98
90.99
160.60
7,489.18
7,415.73
-1,681.70
-1,515.42
5,964275.61
348,029.11
2.10
1,574.67 MWD+IFR2+SAG+MS(12)
8/14!2018 12.48.20PM Page 8 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Coordinate Reference:
Well CD5-98
Project:
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usft (D25)
Sits:
CDS Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
Wan:
CDS-98
North Reference:
True
Waltham:
CDS-981-1
Survey Calculation Method:
Minimum Curvature
Design:
CDS-981.1
Database:
EDT 14 Alaska Production
Survey
81142019 12:48:20PM Page 9 COMPASS 5000.14 Build 85H
Map
Map
Vertical
MD
Inc
Azi
TVD
TVDSS
+N/.R
+E/ -W
Northing
Easting
DLS
Section
WI)
(*)
P)
(craft)
loan)
(uaft)
(usfry
(tq
(ft)
(°/1001
(ft) Survey Tool Name
22,232.04
90.09
15379
7,488.27
7,414.82
-1,770.19
-1,476.21
5,964,186.40
348,064.53
7.15
1,665.49 MM+IFR2+SAG+MS (12l
22,327.0
91.09
151.25
7,487.29
7,413.84
-1,85478
-0,434.21
5,964,100.95
348,106.82
2.86
1,752.88 MWD+IFR2+5AG+MS(12)
22,422.15
91.15
148.96
7,465.49
7,411.99
-1,935.90
-1,387.00
5,964,017.90
348,152.3B
2.42
1,838.02 MWD+IFR2+SAG+MS(12)
22,516.59
91.20
148.40
7,483.50
7,410.05
-2,017.56
-1,337.92
5,963,936.28
348,199.83
0.60
1,921.84 MWD+IFR2+5AG+MS(12)
22,611.62
91.09
148.12
7,481.60
7408.15
-2,098.36
-1,287.94
5,963,854.50
348,248.18
0.32
2,005.85 MWD+IFR2+SAG+MS(12)
22,705.40
90.68
148.04
7,480.14
7,406.69
-2,178.80
-1,237.83
5,963,773.08
348,296.66
0.44
2,089.52 MWD+IFR2+SAG+MS(12)
22,801.10
89.91
148.58
7,479.65
7,406.20
-2,259.38
4,188.09
5,963,691.53
348,344.78
0.99
2,173.29 MWD+IFR2+SAG+MS(12)
22,896.72
89.40
148.27
7,480.23
7,406.78
-2,340.84
-1,138.02
5,963,609.09
348,393.20
062
2,257.97 MWD+IFR2+SAG+MS(12)
22,991.70
89.34
152.25
7,481.27
7,407.82
-2,423.29
-1,090.91
5,963,525.72
348,438.64
4.19
2,343.44 MWD+IFR2+SAG+MS(12)
23,086.96
89.21
154.61
7,4B2.48
7,409.03
-2,508.48
-1,048.31
5,963,439.70
348,479.53
2.48
2431.32 MWD+IFR2+SAG+MS(12)
23,182.87
88.92
155.02
7,484.04
7,410.59
-2,595.26
-1,007.50
5,963,352.13
348,518.58
0.52
2,520.68 MWD+IFR2+SAG+MS(12)
23,278.04
88.93
154.29
7,485.83
7,412.38
-2,681.25
-966.77
5,963,265.34
348,557.5B
0.77
2,609.25 MWD+IFR2+5AG+MS(12)
23,372.76
88.69
15530
7,487.79
7,414.34
-2,766.93
.26.44
5,963,178.87
348,596.18
1.10
2,697.47 MWD+IFR2+SAG+MS(12)
23,468.06
88.28
154.61
7,490.31
7,416.85
-2,853.26
-886.11
5,963,091.76
348,634.78
0.84
2,786.35 MWD+IFR2+SAG+MS(12)
23,562.63
89.53
155.54
7,492.12
7,418.67
-2,938.99
-M17
5,963,00.5.26
348,672.89
1.65
2,874.58 MWD+IFR2+SAG+MS(12)
23,657.93
89.12
153.43
7,493.24
7,419.79
-3.024.98
-805.22
5,962,918.47
348,712.20
2.26
2,963.17 MWD+IFR2+SAG+MS(12)
23,752.71
89.21
153.04
7,494.63
7,421.18
-3,109.60
-762.55
5,962,833.02
348,753.17
0.42
3,050.50 MWD+IFR2+SAG+MS(12)
23,844.15
90.31
156.23
7,49501
7,421.55
-3,192.21
-723.38
5,962,749.65
348,790.67
3.69
3,135.58 MWD+IFR2+SAG+MS (12)
23,943.41
90.36
154.57
7,494.43
7,420.98
-3,282.46
-682.06
5,962,658.60
348,830.17
1.67
3,228.43 MWD+IFR2+SAG+MS(12)
24,038.90
90.41
151.20
7,493.79
7,420.34
-3,367.44
4138.55
5,962,572.77
348,871.97
3.53
3,316.18 MWD+IFR2+SAG+MS(12)
24,132.88
89.77
148.84
7,493.64
7,420.19
-3,448.84
-891.59
5,962,490.5
348,917.28
2.60
3,400.58 MWD+IFR2+SAG+MS(12)
24,230.41
89.96
147.51
7,493.87
7,420.42
-3,531.70
-540.16
5,962,406.58
348,967.04
1.38
3,486.76 MWD+IFR2+SAG+MS(12)
24,325.51
89.70
149.94
7,494.15
7,420.70
41,612.98
-490.79
5,962,324.34
349,014.76
2.57
3,571.20 MWD+IFR2+SAG+MS(12)
24,420.42
89.89
151.32
7,494.49
7,421.04
-3,695.68
444.25
5,962,240.72
349,059.64
1.47
3,656.89 MWD+IFR2+SAG+MS(12)
24,515.84
88.98
151.76
7,495.43
7,421.98
-3,779.57
-39878
5,962155.95
349,103.42
1.06
3,743.67 MWD+IFR2+SAG+MS(12)
24.611.31
Was
152.90
7,497.21
7,423.76
-3,864.10
-354.45
5,962,070.55
349,146.04
1.20
3,831.02 MWD+IFR2+SAG+MS(12)
24,706.23
89.28
156.02
7,498.74
7,425.29
-3,949.73
-313.54
5,961,984.13
349,185.22
3.31
3,919.23 MWD+IFR2+SAG+MS(12)
24,800.98
89.55
156.20
7,499.71
7,426.26
4,036.35
-275.17
5,961,896.76
349,221.85
0.34
4,008.27 MWD+IFR2+SAG+MS(12)
24,896.83
89.72
156.35
7,600.32
7,426.87
4,124.10
-236.61
5,961,808.26
349,258.64
0.24
4,098.44 MWD+IFR2+SAG+MS(12)
24,991.46
88.87
154.89
7,501.48
7,428.03
4,210.28
-197.55
5,961,721.32
349,295.96
1.79
4,187.08 MWD+1FR2+5AG+MS(12)
25,086.17
86.91
154.26
7,504.97
7,431.52
4,295.76
-156.92
5,961,635.06
349,334.8]
2.17
4,275.12 MWD+IFR2+SAG+MS(12)
25,182.46
86.16
155.65
7,51079
7,437.34
4,382.83
-116.23
5,961,547.19
349,373.80
1.64
4,364.76 MWD+IFR2+SAG+MS(12)
25,275.02
84.03
154.73
7,518.70
7,445.25
4,466.54
-77.54
5,961,462.73
349,410.81
2.51
4,450.91 MWD+IFR2+SAG+MS(12)
25,371.63
84.69
153.96
7,528.20
7,454.75
4,553.20
-35.91
5,961,375.26
349,450.69
1.05
4,540.20 MWD+IFR2+SAG+MS(12)
25,467.43
87.86
151.52
7,534.42
7,460.97
4,638.16
7.87
5,961,289.45
349,492.75
4.17
4,627.94 MM+IFR2+5AG+MS (12)
25,563.87
88.93
148.75
7,537.12
7,463.67
4,721.75
55.87
5,961,204.92
349,539.07
3.08
4,714.61 MWD+IFR2+SAG+MS (12)
25,659.93
89.26
143.00
7538.64
7465.19
4,801.23
109.73
5,961,124.38
349,591.32
5.99
4,797.55 MWD+IFR2+SAG+MS(12)
25,754.76
90.05
144.41
7,539.21
7,465.76
4,877.65
165.86
5,961,046.85
349,645.90
170
4,877.63 MWD+IFR2+SAG+MS(12)
25,848.79
88.22
147.63
7,539.81
7,466.36
4,955.61
218.41
5,960,967.86
349,696.87
3.54
4,958.99 MWD+IFR2+SAG+MS (12)
25,944.41
88.85
149.34
7,541.42
7,467.97
b,03TQ
268.38
5,960,885.38
349,745.20
1.83
5,043.70 MWO+1FR2+5AG+MS(12)
81142019 12:48:20PM Page 9 COMPASS 5000.14 Build 85H
ConocoPhillips
Definitive Survey Report
Company:
NADConversion
Local Co-ordinate Reference:
Well CD5-98
Project:
Western North Slope
TVD Reference:
CD5-98 Actual @ 73.45usft (025)
She:
CDS Alpine West Pad
MD Reference:
CD5-98 Actual @ 73.45usft (D25)
Well:
CD5-98
North Reference:
True
Wellbore:
CD5-981-1
Survey Calculation Method:
Minimum Curvature
Design:
CD5-981-1
Database:
EDT 14 Alaska Production
Survey
Map
Map
Vertical
MD
Inc
AzI
TVD
TVDSS
+N/S
+E/ -W
Northing
Seating
DLS
Section
(usm
(')
(9
(usft)
(waft)
(usft)
(wft)
01)
(1q
(°/1001)
(ft) Survey Tool Name
26,039.72
88.71
155.66
7,543.45
7,470.00
5,121.60
312.36
5,960,800.04
349,787.47
6.63
5,130.98 MWD+IFR2+SAG+MS(12)
26,135.40
88.92
157.02
7,545.43
7,471.98
-5,209.21
350.74
5,960,711.68
349.824.10
1.44
8221.00 MWD+IFR2+$AG+MS(12)
26,229.84
89.41
155.24
7,546.81
7,473.35
5,295.56
388.96
5,960,624.59
349,860.57
1.95
5,309.75 MWD+IFR2+SAG+MS(12)
26,325.03
89.19
148.58
7,547.97
7,474.52
5,379.49
433.75
5,960,539.79
349,903.66
7.00
5,396.53 MWD+IFR2+SAG+MS(12)
26,420.82
91.78
147.60
7,547.16
7,473.71
5,460.79
484.37
5,960,457.50
349,952.65
2.89
5,481.9 MWD+IFR2+SAG+MS (12)
26,516.66
91.71
148.74
7,544.24
7,470.79
5,542.18
534.90
5,960,375.12
350,001.53
1.19
5,565.73 MWD+IFR2+SAG+MS(12)
26,611.51
91.42
150.28
7,591.65
7,468.20
5,623.88
583.00
5,960,292.48
350,047.9B
1.65
5,650.51 MWD+IFR2+SAG+MS(12)
26,706.50
91.75
152.79
7,539.02
7,465.57
5,707.35
628.26
5,960,206.13
350,091.55
2.66
5,736.87 MWD+IFR2+SAG+MS(12)
26,801.18
88.90
155.05
7,538.49
7,465.04
5,792.37
669.87
5,960,122.29
350,131.45
3.84
5,824.53 MWD+IFR2+SAG+MS(12)
26,825.00
89.02
153.61
7,538.92
7,465.47
5,813.83
680.19
5,960,100.63
350,141.34
6.05
5,846.65 Interpolated Station
412"
26,897.86
89.41
149.22
7,539.91
7,466.46
5,877.79
715.03
5,960,035.99
350,174.89
6.05
5,912.83 MWD+IFR2+SAG+MS(12)
26,992.65
89.23
147.98
7,541.04
7,467.59
5,958.69
764.42
5,959,954.12
350,222.69
1.32
5,996.90 MWD+IFR2+SAG+MS (12)
27,088.11
89.20
14B.12
7,542.35
7,468.90
5,039.68
814.93
5,959,872.14
350,271.51
0.15
6,081.14 MWD+IFR2+SAG+MS (12)
27,183.50
89.20
147.97
7,543.68
7,470.23
6,120.61
865.41
5,959,790.22
350,320.36
0.16
6,165.32 MWD+IFR2+SAG+MS(12)
27,278.95
89.27
147.50
7,544.95
7,471.50
5,201.32
916.36
5,959,708.52
350,369.68
0.50
6,249.30 MWD+IFR2+SAG+MS(12)
27,374.01
89.38
150.15
7,546.07
7,472.62
6,282.64
965.56
5,959,626.24
350,417.24
2.79
6,333.78 MWD+IFR2+SAG+MS(12)
27,469.04
89.38
152.68
7,547.10
7,473.65
5,366.07
1,011.02
5,959,541.92
350,461.01
2.66
6,420.11 MWD+IFR2+SAG+MS(12)
27,564.34
89.23
154.42
7,548.26
7,474.81
6,451.39
1,053.46
5,959,455.77
350,501.74
1.83
6,508.12 MWD+IFR2+SAG+MS(12)
27,659.71
89.27
154.42
7,549.51
7,476.06
5,537.40
1,094.64
5,959,368.96
350,541.18
0.04
6,596.74 MWD+IFR2+SAG+MS (12)
27,755.49
89.23
153.49
7,550.76
7,477.31
6,623.45
1,136.69
5,959,282.09
350,581.49
0.97
6,685.44 MWD+IFR2+SAG+MS(12)
27,850.15
89.30
153.87
7,551.97
7,478.52
5,708.28
1,178.66
5,959,196.44
350,621.75
0.41
6,772.94 MWD+IFR2+SAG+MS(12)
27,945.77
89.51
157.48
7,552.97
7,479.52
6,795.40
1,218.03
5,959,108.56
350,659.37
3.78
6,862.53 MWD+IFR2+SAG+MS(12)
28,041.11
89.68
161.20
7,553.64
7,480.19
5,884.59
1,251.67
5,959,018.72
350,691.21
3.91
6,953.81 MWD+IFR2+SAG+MS(12)
28,135.97
89.89
165.12
7,554.0
7,480.55
6,975.36
1,279.14
5,958,927.42
350,716.86
4.14
7,046.24 MWD+IFR2+SAG+MS(12)
28,231.01
89.95
165.92
7,554.13
7,480.68
-7,067.38
1,302.90
5,958,834.95
350,738.77
0.84
7,139.66 MWD+IFR2+SAG+MS(12)
28,327.6
90.03
163.62
7,554.15
7,480.70
-7,160.05
1,328.13
5,958,741.80
350,762.14
2.40
7,233.64 MWD+IFR2+SAG+MS(12)
28,421.68
89.98
161.79
7,554.14
7,480.69
-7,250.39
1,366.26
5,958,650.92
350,788.45
1.93
7,325.88 MWD+IFR2+SAG+MS(12)
28,517.07
90.50
161.39
7,553.74
7,480.29
-7,340.90
1,386.39
5,958,559.84
350,816.75
0.69
7,418.23 MWD+IFR2+SAG+MS(12)
28,611.14
89.10
159.27
7,554.07
7,480.62
-7,429.47
1,418.05
5,958470.66
350,846.63
2.70
7,508.75 MWD+IFR2+SAG+MS(12)
28,706.20
89.38
157.58
7,555.33
7,481.88
-7,517.86
1,453.00
5,958,381.59
350,879.80
1.80
7,599.31 MWD+iFR2+SAG+MS(12)
28,802.43
89.45
156.69
7,556.31
7,482.86
-7,606.52
1,490.39
5,958,292.20
350,915.40
0.93
7,690.31 MWD+IFR2+SAG+MS(12)
28,896.23
89.12
152.55
7,557.48
7,484.03
-7,691.25
1,530.57
5,958,206.70
350,953.88
4.42
7,777.58 MWD+IFR2+SAG+MS(12)
28,991.28
89.40
151.72
7,558.71
7,485.26
-7,775.27
1,574.99
5,958,121.80
350,996.60
0.93
7,864.43 MWD+IFR2+$AG+MS(12)
29,087.30
89.76
150.16
7,559.41
7,485.96
-7,859.20
1,621.63
5,958,036.97
351,041.54
1.67
7,951.33 MWD+IFR2+SAG+MS(12)
29,183.66
89.04
147.66
7,560.42
7,486.97
-7,941.71
1,671.38
5,957,953.48
351,089.63
2.70
8037.04 MWD+IFR2+SAG+MS(12)
29,277.39
89.55
146.12
7,561.58
7,488.13
41,020.21
1,722.57
5,957,873.98
351,139.23
1.73
8118.84 MWD+IFR2+SAG+MS(12)
29,372.80
89.74
144.23
7,562.17
7,488.72
6,098.53
1,777.05
5,957,794.59
351,192.13
1.99
8,200.68 MWD+IFR2+SAG+MS(12)
29,420.46
90.10
143.48
7,562.23
7,488.78
5,137.01
1,805.16
5,957,755.55
351,219.46
1.75
8240.99 MWD+IFR2+SAG+MS(12)
29,480.00 '
90.10
143.8
7,562.13
7,488.68
6,164.86
1,840.60
5,957,707.01
351,253.93
0.00
8,291.14 PROJECTED 0 TO
8/1412019 12:48:20PM Page 10 COMPASS 5000.14 Build 85H
Company:
NADConversion
Project:
Western North Slope
Slits:
CD5 Alpine West Pad
Well:
CDS-98
Wellbore:
CDS-98L1
Design:
CD5-98L1
Survey
MD Inc Azi TVD TVDSS *N/S
(usft) (") (°) (usft) (usft) (usft)
61/2' ON
ConocoPhillips
Definitive Survey Report
Local Coordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Database:
Well CD5-98
CDS-98 Actual @ 73.45usft (D25)
CD5-98 Actual @ 73.45usft (D25)
True
Minimum Curvature
EDT 14 Alaska Production
Map Map Vertical
+El -W Northing Easting US Section
(usft) (ft) Ift) (°/100) (ft) Survey Tool Name
8/142019 12:48:20PM Page 11 COMPASS 5000.14 Build 85H
Cement Detail Report
CD5-98
Job:
String: Conductor Cement
DRILLING ORIGINAL, 6/4/201912:00
Cement Details
Description
Conductor Cement
13/10/201918
Cementing Start Date
00
Cementing End Date
3/10/2019 18:00
Wellbore Name
CD5-98
Comment
10 yards cement
Cement Stages
Stage # 1
Description
Conductor Cement
Objective
Top Depth (ftKB)
84.0
Bottom Depth (ftKB)
115.0
Full Return?
No
Vol Cement...
Top Plug?
No
Btm Plug?
No
Q Pump Init (bbl/m...
Q Pump Final (bbl/...
Q Pump Avg (bbl/...
P Pump Final (psi)
P Plug Bump (psi)
Recip?
No
Stroke (ft)
Rotated?
No
I Pipe RPM (rpm)
Tagged Depth (ftKB)
Tag Method
Depth Plug Drilled Out To (ftKB)
Drill Out Diameter (in)
Comment
10 yards of cement poured down annulus.
Cement Fluids & Additives
Fluid
Fluid Type
Fluid Description
Estimated Top (ftKB)
Est Btm (ftKB)
Amount (sacks)
Class
Volume Pumped (bbl)
Yield (ft /sack)
Mix H2O Ratio (gal/sa...
Free Water (%)
Density (Ib/gal)
Plastic Viscosity top)
Thickening Time (hr)
CmprStr t (psi)
Additives
Additive
Type
Concentration
Cone Unit label
Page 1/1
Report Printed: 9/5/2019
Page 111 ReportPrinted: 9/5/20191
Cement Detail Report
CD5-98
Job:
String: Surface Cement
DRILLING ORIGINAL, 6/4/2019 12:00
Cement Details
DescriptionCementing
Surface Cement
I6/9/201913:45
Start Date
Cementing End Date
16/9/201917:55
Wellbore Name
CD5-98
Comment
Cement Stages
Stage # 1
Description
Surface Cement
Objective
I Top Depth (ftKB)
39.2
Bottom Depth (ftKB)
2,296.0
Full Return?
No
Vol Cement...
110.0
Top Plug?
Yes
Btm Plug?
Yes
Q Pump Init (bbl/m...
4
Q Pump Final (bbl/...
34
10 Pump Avg (bbl/...
P Pump Final (psi)
540.0
P Plug Bump (psi)
1,037.0
Recip?
Yes
Stroke (ft)
16.00
Rotated? I
No
Pipe RPM (rpm)
Tagged Depth (ftKB)
Tag Method
Depth Plug Drilled Out To (ftKB)
Drill
Out Diameter (in)
Comment
Mud Push recieved at Surface at 267 bbl of job away. Lead slurry pumping stopped once Lead slurry received at surface after 302.6 pumped. 60.2 bbls of Tail
pumped. Plug bumped @ 17:25
Cement Fluids & Additives
Fluid
Fluid Type
Surface Lead Cement
Fluid Description
Estimated Top (ftKB)
39.1
Est Btm (ftKB)
1,774.9
Amount (sacks)
890
Class
CD CRETE
Volume Pumped (bbl)
302.6
Yield (ft'/sack)
1.91
Mix H2O Ratio (gal/sa...
6.65
Free Water (%)
Density (Ib/gal)
11.00
Plastic Viscosity (cP)
ThickeningTime hr
35.00 ( 1
Cm rStr t
P (Psi)
Additives
Additive
Type
Concentration
Cone Unit label
Fluid
Fluid Type
Surface Tail Cement
Fluid Description
Estimated Top (ftKB)
1,774.9
Est Btm (ftKB)
2,296.0
Amount (sacks)
292
Class
G
Volume Pumped (bbl)
60.2
Yield (ft'/sack)
1.16
Mix H2O Ratio (gal/sa...
5.00
Free Water (%)
Density (Ib/gap
15.80
Plastic Viscosity (cP)
Thickening Time (hr)
18.00
CmprStr 1 (psi)
Additives
Additive
Type
Concentration
Cone Unit label
Page 111 ReportPrinted: 9/5/20191
Cement Detail Report
CDS-98
String: Intermediate Casing Cement
Job: DRILLING ORIGINAL, 6/4/2019 12:00
Cement Details
Description
Cementing Start Date
Cementing End Date
Wellbore Name
Intermediate Casing Cement
6/23/201914:00
6/23201918:15
CD5-98
Comment
Packed off when 16 bbls cemt out shoe, varied pump rate to obtain best returns, lost 29 bbls cmt of the 99 pumped.
Cement Stages
Stage # t
Description
Objective
Top Depth (ftKB) Bottom Depth (ftKB)
Full Return? Ivol
Cement...
I Top Plug?
Btm Plug?
Intermediate Casing
The greater of 500'MD or
13,239.0 14,361.9
No
0.0
Yes
Yes
Cement
250'TVD of cement
Q Pump Init (bbl/m...
Q Pump Final (bbl/...
Q Pump Avg (bbl/...
P Pump Final (psi) P Plug Bump (psi)
Recip?
Stroke (ft)
Rotated?
Pipe RPM (rpm)
5 13
4
557.0 1,600.0
1 Yes
13.50
No
Tagged Depth (ft(B)
Tag Method Depth Plug Drilled Out To (ftKB) Drill
Out Diameter (in)
Comment
Pumped cement as per CPA]/Schlumberger cement detail while reciprocating from 14, 360'to 14,338' MD. SLB pump 60 bbls of 11.5 ppg of Mud push and
dropped top plug, followed by pumping 99.1 bbls of 15.8 cement. Dropped bottom plug and pumped 20.2 bbls of H2O and SBL swapped over to rig pumps at 4.5
bpm and 452 psi. Flow out was observed at 12%, Pick-up weight — 350k, Slack-off weight 160k. Observed cement outrunning pumps based on steep hole
inclination and noted the bottom plug landed early. With 16 bbls of cement out of shoe, observed pack-off and noting losses, attempt to pick up and move pipe at
90k over with no movement. Set hgr down in its appropriate profile without issue. Varied pump rate to obtain best returns, (1-3) bpm, top plug landed early at
6,136 strokes, pressure was observed at 1,600 psi. CIP at 1805 his. Total cement pumped 99 bbls, total losses, 29 bbls.
Cement Fluids & Additives
Fluid
Fluid Type
Fluid Description
Estimated Top (ftKB)
Est Btm (ftKB)
Amount (sacks)
Class
Volume Pumped (bbl)
Intermediate Cement
13,239.0
14,361.9
480
G
99.1
Yield (fP/sack)
Mix H2a Ratio (gal/sa...
Free Water (% J
Density (Ib/gal)
Plastic Viscosity (cP)
Thickening Time (hr)
CmprStr 1 (psi)
1.16
5.07
15.80
152.5 14.50
Additives
Additive
Type
Concentration
Conc Unit label
Page 1/1 ReportPrinted: 9/5/20191
21go
31176
5chiumbepgop Transmittal #: 04SEP19-SP02
Drilling & Measurements
Product Delivery
Customer:
ConocoPhillips Alaska, Inc.
Dispatched To:
AOGCC: Natural Resource Tech
Well Name:
CD5-981_1
Date Dispatched:
4 -Sep -19
Service Order #: 19AKA0050 Dispatched By: Stephanie Pacillo
Product I Description
Hardcopy
Di ital Copv
Logging Date
LWD Recorded Mode Prints:
N/A
Contents on CD
31 -Jul -19
Scope Resistivity 2" MD
2" TVD
x
5" MD
x
5" TVD
RECEIVED
x
x
SEP
0 5 2019
AC
GCC
Digital Data
N/A
Contents on CD
DLIS / LAS Data
x
Surveys
N/A
Contents on CD
Directional Survey Nad27
x
Directional Survey Nad83
x
CD
1
Contents on CD
Data: DLIS/ LAS
x
Graphics: PDF
x
Surveys: PDF/TXT
x
Please sign and email a copy to: Please sign and email a copy to:
Tom Osterkamp(a)conocophillips com Alaska PTSPrintCenterCcDslb com
Attn: Tom Osterkamp Attn: Stephanie Pacillo
Received B
Regg, James B (CED)
From: Laubenstein, Lou (CED)
Sent: Friday, July 5, 2019 12:45 PM � ,`1 I �I lei
To: Regg, James B (CED) IVB(
Subject: CD5-98 Upper IBOP test chart 7-5-19.pdf
Attachments: CD5-98 Upper IBOP test chart 7-5-19.pdf, ATTO0001.htm
I am happy with the last 5 minutes, small volume makes for a hard test. If you have any more concerns or aren't happy
let me know.
THE STAY'
°fALASKA
GOVERNOR MIKE DUNLEAVY
Chip Alvord
Drilling Manager
ConocoPhillips Alaska, Inc.
PO Box 100360
Anchorage, AK 99510-0360
Alaska Oil and Gas
Conservation Commission
Re: Colville River Field, Alpine Oil Pool, CRU CD5-98L1
ConocoPhillips Alaska, Inc.
Permit to Drill Number: 219-060
Surface Location: 281' FNL, 2402' FEL, SEC. 18, T1 IN, R4E, UM
Bottomhole Location: 286' FNL, 4497' FEL, SEC. 29, TI IN, R4E, UM
Dear Mr. Alvord:
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.cogcc.olaska.gov
Enclosed is the approved application for the permit to drill the above referenced development well.
The permit is for a new wellbore segment of existing well Permit No. 219-059, API No. 50-103-20803-
00-00. Production should continue to be reported as a function of the original API number stated above.
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run
must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this
well.
This permit to drill does not exempt you from obtaining additional permits or an approval required by law
from other governmental agencies and does not authorize conducting drilling operations until all other
required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw
the permit in the event it was erroneously issued.
Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska
Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an
applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC
order, or the terms and conditions of this permit may result in the revocation or suspension of the permit.
S' cerely,
Daniel T. Seamount, Jr.
Commissioner
Ad
DATED this_ day of May, 2019.
STATE OF ALASKA
AuLKA OIL AND GAS CONSERVATION COMMON
PERMIT TO DRILL
20 AAC 25.005
RECEIVED
APR 11 2019
1a. Type of Work:
111b. Proposed Well Class:
Exploratory - Gas ❑ Service - WAG ❑ Service - Disp
ic. S eci i 1I1,�s�,o for:
Drill 0 Lateral ❑
Stratigraphic Test El
Development - Oil P) Service - Winj El Single Zone 21Coalbed
a-sk4l tes ❑
Reddll ❑ Reentry ❑
I Exploratory - Oil ❑
Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑
Geothermal ❑ Shale Gas ❑
2. Operator Name:
5. Bond: Blanket Q Single Well ❑
11. Well Name and Number:
ConocoPhillips
Bond No. 59-52-180
CRU-CD5-98L1
3. Address:
6. Proposed Depth:
12. Field/Pool(s):
P.O. Box 100360 Anchorage, Alaska, 99510-0360
MD: 30708 TVD: 754
Colville River Unit
Alpine Pool
4a. Location of Well (Governmental Section):
7. Property Designation: W-"J4.41Ib1fl
Surface: 281' FNL, 2402' FEL, Sec. 18, T11 N, R4E, UM
ASRC-NPR4,ASRC-AA092344;ASRC-NPR2, ASRC-NPR3
011
8. DNR Approval Number:
13. Approximate Spud Date:
Tap of Productive Horizon:
311' FNL, 2756' FEL, Sec. 12, T11 N, R3E, UM
932669, 340757, 932128, 342658
5/8/2019
9. Acres in Property:
14. Distance to Nearest Properly:
Total Depth:
4599' FNL, 5002' FEL, Sec. 20, Ti 1N, R4E, UM
5032, 3122, 8838, 3200
681'to ASRC-NPR4
4b. Location of Well (State Base Plane Coordinates - NAD 27):
10. KB Elevation above MSL (ft): 74.7
15. Distance to Nearest Well Open
Surface: x- 349576 y- 5965926
Zone -4
GL / BF Elevation above MSL (ft): 33.9
to Same Pool: 1465' CD5-25Li
16. Deviated wells: Kickoff depth:
625 feet
17. Maximum Potential Pressures in psig (see 20 AAC 25.Q5) rr
Maximum Hole Angle:
90 degrees
Downhole: 3 ��()O Surface: 2 2°f 2s .J 1/1/9
18. Casing Program: Specifications
op -Setting Depth - Bottom Cement Quantity, c.f. or sacks
Hole Casing Weight Grade
I Coupling Length
MD TVD MD TVD (including stage data)
42" 20" 78.6 B
Welded 74
41 14 115 115 10 yds
13.5" 10.75" 45.5 L-80
TXP 2255
41 41 2296 2189 991 sx 11.0ppg, 271 sx 15.8ppg G
9.875x11" 7.625" 29.7 L-80
TXP 14209
41 41 14250 7514 491sx 15.8ppg Class G
6.5" 4.5" 12.2 L-80
T -Blue 16908
13800 7449 30708 7594 Lined with blank pipe and frac ports
19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations)
Total Depth MD (ft): Total Depth TVD (ft):
Plugs (measured): Effect. Depth MD (ff): Effect. Depth TVD (ft): Junk (measured):
Casing Length
Size Cement Volume MD TVD
Conductor/Structural
Surface
Intermediate
Production
Liner
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Hydraulic Fracture planned? Yes❑
No 7
BOP Sketch
20. Attachments: Property Plat ❑
Drilling Program
Tiv. Depth
Shallow Hazard Analysis
Diveot
rter Sketch
B Seabed Report
e Dring Fluid Program
l
e 20 AAC 25.050 requirements8
21. Verbal Approval: Commission Representative:
Date
22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be
deviated from without prior written approval.
Contact Name: Andy Marushack
Authorized Name: Chip Alvord
Contact Email: and ..marushack CO .Com
Authorized Title: Drilling Manager
Contact Phone: 907-265-6337
Authorized Signature:
Date:DCIII 1
Commission Use Only
Permit to Drill G
API Number:
Permit Approv
2� IC
See cover letter for other
Number: `���60
50- -
80 -0O
Date:
Z
requirements.
Conditions of approval : If box is checked, well
r,/
may not be used to explore fpr, test, or produce coalbed methane, gas hydrates, or gas contained in shales: L7
Other: BOP fGS .DI�ISSV �G
,Yr'b 3.7 D 0 PSr15 Samples req'd: Yes E] Noy Mud log req'd: Yes❑ NoW
,�N i1 r/7 ar'7p!'! ✓P ✓I tr �" ttS1" Z S Cpli;9&basures: Yes ❑ No Q' Directional svy req'd: Yes 2' No[,--],/
Spacing exception req'd: Yes ❑ No& Inclination -only svy req'd: Yes E]Noy'
Post initial injection MIT req'd: Yes ElNoL-I
APPROVED BY S- / Z 119
Approved by:
COMMISSIONER THE COMMISSION Date:
�/ ( ///��� ^ • 1 Submit Form and
(�I-'bffiL74-4 e p17 This permit is valid for �4 nRIf®�iNellf aCproval per 20 AAC 25.005 Attachatents in Dnplicater )I�
ConocoPhillips Alaska, Inc.
Post Office Box 100360
Anchorage, Alaska 99510-0360
Telephone 907-276-1215
April 10, 2019
Alaska Oil and Gas Conservation Commission
333 West 71 Avenue, Suite 100
Anchorage, Alaska 99501
Re: Application for Permit to Drill CRU CD5-98LI
Dear Sir or Madam:
ConocoPhillips
ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig
Doyon 25. The intended spud date for this well is 5/8/2019.
CRU CD5-98L I is planned to be an Alpine C Sand upper lateral producer out of the CD5-98 parent well (covered in separate
PTD). When the CD5-98LI is commenced, the parent well will have run and cemented 10-3/4" surface casing to above the C30
Sand. 7-5/8" intermediate casing will have been run and cemented to 250' TVD above the uppermost hydrocarbon bearing
interval. A 6-1/2" lateral will have been drilled in the Alpine A Sand and lined with a 4-1/2" liner, with a whipstock set above
for the CD5-98L I kickoff in the Alpine C Sand.
The CD5-98LI lateral will then be drilled in the Alpine C Sand and partially lined with 4-1/2" liner. The well will be
completed with a 4-1/2" upper completion. A waiver is requested to set the production packer approximately 1,000' above the
casing shoe as per 20 AAC 25.412(b).
Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information
attached to this application includes the following:
1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a)
2. A proposed drilling program
3. A proposed completion diagram
4. A drilling fluids program summary
5. Pressure information as required by 20 AAC 25.035 (d)(2)
6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b)
Information pertinent to the application that is presently on file at the AOGCC:
1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20
AAC 25.035 (a) and (b).
2. A description of the drilling fluids handling system.
3. Diagram of riser setup.
If you have any questions or require further information, please contact Andy Marushack at 265-6337
(andy.j.marushack@ConocoPhillips.com) or Chip Alvord at 265-6120.
Sincer ly, cc:
CD5-98LI Well File / Ann Haggerty -Sherrod
ATO 1530
j4X;/—� Johnson Njoku
ATO 1720
Chip Alvord
ATO 1570
Andy Marushack Katheryn Hoffineister
ATO 1760
Drilling Engineer Lanston Chin
Kuukpik Corp
Applicatio Permit to Drill, Well CRU CD5-981-1
Saved: 11 -Apr -19
CD5-98L1
Application for Permit to Drill Document
Table of Contents
1.
Well Name (Requirements of 20 AAC 25.005 ()9)............................................................
3
2.
Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................
3
Requirementsof 20 AAC 25.050(b)................_...........................................................................................
3
3.
Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3))
3
4.
Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) ........................4
5.
Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005
(c) (5)).........................................................................................................................
5
6.
Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) ..........
5
7.
Diverter System Information (Requirements of 20AAC 25.005(c)(7)) .........................
5
8.
Drilling Fluid Program (Requirements of20AAC 25.005(c)(8)) ....................................6
9.
Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9))
...................................................................................................................................
7
10.
Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) .........................................
7
11.
Seabed Condition Analysis (Requirements of'20 AAC 25.005 (c)(11)) ........................7
12.
Evidence of Bonding (Requirements of20AAC 25.005 (c)(12)) ...................................7
13.
Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) .........................7
14.
Discussion of Mud and Cuttings Disposal and Annular Disposal .......................
8
(Requirements of 20 AAC 25.005(c)(14)).............................................................................
8
15.
Attachments...............................................................................................................
8
Attachmentt Cement Summary.................................................................................................................
8
CD5-98L1 APD
Page 1 of 15
Printed: 11 -Apr -19
Applicatiol Permit to Drill. Well CRU CD5-981-1
Saved: 11 -Apr -19
Attachment 2 Drilling Hazards Summary ................................................................................................... 8
Attachment 3 Completion Schematic ........... ......................................................................................... I..... 8
Attachment 4 Directional Plan.................................................................................................................. 8
CD5-98L1 APD
Page 2 of 15
Printed. 11 -Apr -19
Applicatioi Permit to Drill, Well CRU C135-981-1
Saved: 11 -Apr -19
1. Well Name (Requirements of 20 AAC 25.005 (9)
The well for which this application is submitted will be designated as CRU CD5-98L1
2. Location Summary (Requirements of20AAC25.005(c)(2))
Location at Surface
281' FNL, 2402' FEL, Sec. 18, TI 1N, ME UM
NAD 1927
Northings: 5,965,926
Eastings: 349,576
RKB Elevation
74.7' AMSL
Pad Elevation
33.9'AMSL
Top of Productive Horizon Heel
Total
311' FNL, 2756' FEL, Sec. 12, TI 1N, R3E UM
NAD 1927
Northings: 5,971,282
Eastings: 344,402
Measured De th, RKB: 13,820'
Total Vertical De th, RKB: 7,449'
S:
Total Vertical Depth, SS.-
Total Depth Toe
4599' FNL, 5002' FEL, Sec. 20, Tl 1N, ME, UM
NAD 1927
Northings: 5,956,276
Eastings: 352,100
Measured Depth, RKB: 30 708'
Total Vertical Depth, RKB: 7,594'
Total Vertical Depth, SS: 1 7-569=
Requirements of20 AAC 25.050(b)
Please see Attachment 4: Directional Plan
The Applicant is the only affected owner.
-4-97.0 SS f
3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3))
Please reference BOP and diverter schematics on file for Doyon 25.
CD5-98L1 APD
Page 3 of 15
Printed: 11 -Apr -19
��.0_
'x116 j I Q
Loepp, Victoria T (DOA)
From: Marushack, Andy J <AndyJ.Marushack@conocophillips.com>
Sent: Wednesday, May 1, 2019 7:59 AM
To: Loepp, Victoria T (DOA)
Subject: RE: [EXTERNAL]CRU CD5-98(PTD 219-059); C135-981-1(PTD219-060) Pressures
Attachments: 2. CD5-98 10-401.xls; 2. C135-981-1 10-401.xis
Follow Up Flag: Follow up
Flag Status: Flagged
Hello Victoria,
Sorry about that. After discussing with our Reservoir Engineer, the latest max predictions for formation pressure are
3,700 psi. I have Updated the 10-401 applications and copied the calcs below. Please let me know if there is anything
else I can do to help.
Sincerely,
Andy
CDS-98
Casing Size
(in)
Csg Setting Depth
MD/TVD(ft)
Fracture
Gradient(pp)
Pore pressure
(psi)
ASP Drilling
(psi)
20
120/120
10.9
51
56
10.75
2,296/2,189
14.5
964
1,432
7.625
14,250/7,514
12.5
3,700
3,167
4.5
31,844/ 7,749
12.5
3,700
n/a
1. ASP CALCULATIONS
Drilling below 20" conductor
ASP = [(FG x 0.052) - 0.1 ] D
_ [(10.9 x 0.052) - 0.1 ] x 120 = 56 psi
OR
ASP = FPP - (0.1 x D)
= 977 - (0.1 x 2190') = 745 psi
2. Drilling below 10-3/4" surface casing
ASP = [(FG x 0.052) - 0.1] D
= [(14.5 x 0.052) - 0.1] x 2189' = 1432 psi
OR
ASP = FPP - (0.1 x D)
= 3700 - (0.1 x 7514') = 2949 psi
Drilling below 7-5/8" intermediate casing
ASP = [(FG x 0.052) - 0.1 ] D
_ [(12.5 x 0.052) - 0.1] x 7514 = 4132 psi
OR
ASP = FPP - (0.1 x D)
-- 3700- (0.1 x 7749') = 2925 psi
CDS -98 Ll
Casing Size
(in)
Csg Setting Depth
MD/TVD(ft)
Fracture
Gradient (ppg)
Pore pressure
(psi)
ASP Drilling
(psi)
20
120/120
10.9
51
56
10.75
2,296 / 2,189
14.5
964
1,432
7.625
14,250/7,514
12.5
3,700
3,167
4.5
30,708/ 7,594
12.5
3,700
n/a
2. ASP CALCULATIONS
4. Drilling below 20" conductor
ASP = [(FG x 0.052) — 0.11 D
=[(10.9x0.052)-0.1]x120=56psi
OR
ASP = FPP — (0.1 x D)
= 977 — (0.1 x 2190') = 745 psi
Drilling below 10-3/4" surface casing
ASP = [(FG x 0.052) — 0.1 ] D
_ [(14.5 x 0.052) — 0.1] x 2189' = 1432 psi
OR
ASP = FPP — (0.1 x D)
= 3700 — (0.1 x 7514') = 2949 psi
6. Drilling below 7-5/8" intermediate casing
ASP = [(FG x 0.052) — 0.11 D
_ [(12.5 x 0.052) — 0.1 ] x 7514 = 4132 psi
OR
ASP = FPP — (0.1 x D)
= 3700— (0.1 x 7594') = 2940 psi
From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Sent: Tuesday, April 30, 2019 10:32 AM
To: Marushack, Andy 1 <Andy.J.Marushack@conocophillips.com>
Subject: [EXTERNAL]CRU CD5-98(PTD 219-059); CD5-98L1(PTD 219-060) Pressures
Andy,
The pore pressures and MPSP on the 10-401 form versus the ASP calculations are inconsistence. Please review and send
me revised pressures or calculations.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil & Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
Applicatiol Permit to Drill, Well CRU CD5-981-1
Saved: 11 -Apr -19
4. Drilling Hazards Information (Requirements of20AAC25.005 (c)(4))
The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well:
Casing Size
in
Csg Setting Depth
MD D ft
Fracture
Gradient(psi)
Pore pressure
ASP Drilling
(psi)
20 1
120/120
10.9
51
56
10.75
2,296 / 2,189
14.5
964
1,4
7.625
14,250 / 7,514
12.5
3,950
3/f67
4.5
30,708/ 7,594
12.5
3,950
/n/a
ASP is determined as the lesser of 1) surface pressure at breakdown of the formatioX casing seat with a gas gradient
to the surface, or 2) formation pore pressure at the next casing point less; gas gradient to the surface as follows:
1) ASP= [(FG x 0.052) - 0.1]*D
Where: ASP = Anticipated Surface pressure in psi
FG = Fracture gradient at the casing seat in Ib/gal
0.052 = Conversion from lb./gal to psi/ft
0.1 = Gas gradient in psi/ft
D = true Vertical depth of casing seat in ft RKB
OR
2) ASP=FPP-(0.1xD)
Where: FPP = Formation Pore Pressure at the next
FPP = 0.4525 x TVD
1. ASP CALCULATIONS
1. Drilling below 20" conductor
ASP - [(FG x 0.052) - 0.1 D
= [(10.9 x 0.052 - 0.1] x 120 = 56 psi
OR
ASP = FPP - (0.1 x
= 977 - (0 x 2190') = 745 psi
2. Drilling below 10-3/4" s face casing
ASP - [(FG x1 52) - O.I J D
_ [(t .5 x 0.052) - 0.1] x 2189' = 1432 psi
OR
ASP = FPP (0.1 x D)
- 3950 - (0.1 x 7514') = 3199 psi
3. Drilling below 7- /8" intermediate casing
ASP= FG x 0.052) - 0.1] D
= [(12.5 x 0.052) - 0.1 ] x 7514 = 4132 psi
OR
AS = FPP - (0.1 x D)
= 3950- (0.1 x 7594') = 3190 psi
0
015
CD5-981-1 APD
Page 4 of 15
Printed.. 11 -Apr -19
Application' Permit to Drill, Well CRU CD5-98L1
Saved: 11 -Apr -19
(B) data on potential gas zones;
The well bore is not expected to penetrate any gas zones.
(C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation
zones, and zones that have a propensity for differential sticking;
Please see Attachment 2 - Drilling Hazards Summary
5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC 25.005 (c)(5))
Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that
ConocoPhillips Alaska has on file with the Commission.
G. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6))
Casin and Cementing Program Detailed in CD5-98 PTD
CsglTbg
Hole
Size
Weight
Grade
Conn.
Length
Top MD/TVD
Btm MD/TVD
Cement Program
OD (in)
(Ib/ft)
(n)
(II)
(h)
20
42
94
H-40
Welded
80
41/41
120/120
10 yards
Cement to Surface with
10.75
13.5
45.5
L-80
2,255
41/41
2,296 / 2,189
991 sx DeepCrete Lead 11.0 ppg,
H563
271 sx Class G Tail Slurry 15.8
H563 /
7.625
9.875
29.7/39
L-80
UP
14,209
41/41
14,250 / 7,514
491 sx of Class G at 15.8 ppg
x11
4.5
6.5
12.2
L-80
Blue
16,908
13,800 / 7,449
30,708/7,594
No cement, Perforation Sub
7. Diverter System Information (Requirements of20AAC25.005(c)(7))
It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, more than
twenty-four penetrations have been completed and there has not been a significant indication of shallow gas or gas
hydrates above the C30 where casing will be set.
CD5-9811 APD
Page 5 of 15
Printed., 11 -Apr -19
Applicatio. Permit to Drill, Well CRU CD5-981_1
Saved: ll -Apr -19
8. Drilling Fluid Program (Requirements of20AAC25.005(c)(8))
Production Hole:
J
The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 —
9.5 ppg with calcium carbonate and KCl and utilize MPD for adding backpressure during connections.
Diagram of Doyon 25 Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033.
CD5-98L1 APD
Page 6 of 15
Printed: 11 -Apr -19
Surface
Intermediate
Production
Hole Size
in.
13.5
9.875 x 11
6.5
Casing Size
in.
10.75
7.625
4.5
Density
PPG
9.0 — 10.0
9.6 —10.8
8.8-9.5 1
PV
CP
30-80
10
10
YP
Ib./100 ftz
100-200
20-28
10-15
Funnel Viscosity
s/qt.
300
50-60
40-50
Initial Gels
Ib./100 ft'
50
10
6
30 Minute Gels
Ib./100 ftz
60
15
8
API Fluid Loss
cc/30 min.
N.C. —15.0
5.0
4.0
HPHT Fluid Loss
cc/30 min.
n/a
8.0-12.0
10.0
PH
11.0
9.5-10.0
9.0-9 .5
Production Hole:
J
The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 —
9.5 ppg with calcium carbonate and KCl and utilize MPD for adding backpressure during connections.
Diagram of Doyon 25 Mud System on file.
Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033.
CD5-98L1 APD
Page 6 of 15
Printed: 11 -Apr -19
Application Permit to Drill, Well CRU CD5-980
Saved: 11 -Apr -19
9. Abnormally Pressured Formation Information(Requirementsof20AAC25.005(c)(9))
N/A - Application is not for an exploratory or stratigraphic test well.
10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10))
N/A - Application is not for an exploratory or stratigraphic test well.
11. Seabed Condition Analysis (Requirements of20 AAC 25.005 (c)(11)
N/A - Application is not for an offshore well.
12. Evidence of Bonding (Requirements of20AAC25.005 (c)(12))
Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission.
13. Proposed Drilling Program(Requirements of20 AAC 25.005 (c)(13))
The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic.
1. End PTD for CD5-98 and begin PTD for CD5-98L1.
2. Pick up and run in hole with 6-1/2" drilling BHA.
3. Drill 6-1/2" hole to section TD (LWD Program: GR/RES)
4. Pull out of hole with drilling BHA.
5. Run 4.5" perforated pup liner, plop and drop in Alpine C lateral.
6. Run in hole whipstock retrieval BHA and retrieve whipstock.
7. RIH with 4.5" tubing with Baker Premier production packer.
a. NOTE: A waiver is requested to set the production packer approximately 1000' MD above the
intermediate casing shoe as per 20 AAC 25.412(b). This is to set the packer above the C sand window
and maintain slickline accessibility to secure the well in the future.
8. Space out and land hanger.
9. Pressure test hanger seals to 5000 psi.
10. Drop ball and rod to set production packer, test tubing to 4,200 psi, chart test.
11. Bleed tubing pressure to 2,200 psi and test IA to 3,850 psi, chart test.
12. Install HP-BPV and test to 2,500 psi.
13. Nipple down BOP.
14. Install tubing head adapter assembly. N/U tree and test tree to 5000 psi/10 minutes.
15. Freeze protection tubing and annulus.
16. Secure well. RDMO.
CD5-98L1 APD
Page 7 of 15
Printed: 11 -Apr -19
Application Permit to Drill, Well CRU CD5-981_1
Saved: 11 -Apr -19
14. Discussion of Mud and Cuttings Disposal and Annular Disposal
(Requirements of 20 AAC 25.005 (c)(14))
Incidental fluids developed from drilling operations on well CD5-98 will be injected into a permitted surface casing
x production casing annulus on CD5.
The C135-98 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze
protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand
based on pre -drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir.
Once CD5-98 and CD5-98L1 have been drilled and completed, consideration may be given to permit this well for
annular injection.
An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to
drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any
zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no
USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the
enclosed directional drilling plan for other formation markers in this well.
Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are
part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas.
The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the
specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling
fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular
injection, the maximum pressure at the surface casing shoe is estimated by:
Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi
_ (12.0 ppg) * (0.052) * (2,189') + 1,500 psi
= 2,866 psi
Pore Pressure = 1,049 psi
Therefore
Differential = 2,866 — 1,049 = 1,817 psi.
The internal casing pressure is conservative, since frictional losses while pumping have not been taken into
consideration. The surface and intermediate casing strings exposed to the annular pumping operations have
sufficient strength by using the 85% collapse and burst ratings listed in the following table:
OD
Wt
(ppf)
Grade
Range
Connection
Type
Collapse
86% Of
Collapse
Burst
85% of
Burst
10-3/4"
45.5
L-80
3
HYD563/BTCM
2470 psi
2100 psi
5210 psi
4429 psi
7-5/8"
29.7
L-80
3
HYD563/BTCM
4790 psi
4071 psi
6890 psi
5856 psi
15. Attachments
Attachment I Cement Summary
Attachment 2 Drilling Hazards Summary
Attachment 3 Completion Schematic
Attachment 4 Directional Plan
CD5-98L1 APD
Page 8 of 15
Printed: 11 -Apr -19
Application ..,r Permit to Drill, Well CRU CD5-98L1
Saved: 11 -Apr -19
Attachment 1 — Cement Summary
CD5-98L1 Cementing Program:
CD5-98 Cement Schematic (wp. 5)
20" 94# H-40 Welded
Conductor to 120'
..............................
10-314" 45.5# L-80 HYD563/TXP
2,296' MD 12,189' TVD @ 39° inc.
.........................
...................
9-718" x 11" Hole
Top of Cement
13,070- MID /7,049'. TVD
Kuparuk C
13,482' MD / 7,299' TVD
KOP in Alpine C
Alpine 13,820'. MID /7,449',TVD ......
13,749' MD / 7,412' TVD -�
` 7-518" 29.7 L-80 HYD6631TXP 8, 394
Alpine A TXP Casing
14,078' MD / 7,496' TVD ��. `� 14,250' MD / 7,514' TVD @ 87°
` r
CD5-98 A Sand 6-112" Hole i CD5-981-1 C Sand 6-112" Hole
31,844' MD/ 7,749@89° 30,708' MD/ 7,594@89°
CD5-98L 1 APD
Page 9 of 15
Printed 11 -Apr -19
I
Application ..r Permit to Drill, Well CRU CD5-98L1
Saved: 11 -Apr -19
10.75" Surface Casing run to 2,296' MD / 2,189' TVD
Cement from 2296' MD to 17961(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1796to surface with
11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost
(1325' MD), zero excess in 20" conductor.
Lead slurry from 1,796' MD to surface with Arctic Lite Crete @ 11.0 ppg
Conductor
(120'— 41) X 1.3645 ft3/ft X 1.0 (0% excess) = 108 ft'
Permafrost to Conductor
(1,325'— 120 X 0.3637 ft3/ft X 3.5 (250% excess) = 1,547 ft'
Top of Tail to Permafrost
(1,796'— 1,3251 X 0.3637 ft3/ftX 1.5 (50% excess) =257W
Total Volume= 108 + 1,547 + 257 = 1,912 ft3 => 991 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk
Tail slurry from 2,296' MD to 1,796' MD with 15.8 ppg Class G + additives
Shoe to Top of Tail
(2,296' —1,796) X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3
Shoe Joint
(80) X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft'
Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer,
0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk
7.625" Intermediate Casine run to 14,250' MD / 7,514' TVD
Top of slurry is designed to be at 13,070' MD, which is 250' TVD above the prognosis shallowest hydrocarbon
bearing zone Kuparuk C. Assume 40% excess annular volume.
*I I" Under reamer is 90' above the 9-7/8" bit.
Tail slurry from 14,250' MD to 13,070' MD with 15.8 ppg Class G + additives
Shoe to top of 9-7/8" Hole
(14,250'— 14,160) X 0.2148 ft3/ftX 1.40 (40% excess) = 27 ft3
11" Hole to to Top of Cement
(14,160'— 13,0701 X 0.3428 ft3/ft X 1.40 (40% excess) = 522 ft3
Shoe Joint
(801 X 0.2578 ft'/ft X 1.0 (0% excess) = 21 ft3
Total Volume = 27+ 522 + 21 = 570 ft3 => 491 sx of 15.8 ppg Class G + 0.2% D046 antifoamer,
0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.16 ft3/sk
CD5-98L1 APD
Page 10 of 15
Printed: 11 -Apr -19
Application. ,r Permit to Drill, Well CRU CD5-9811
Saved: 11 -Apr -19
Attachment 2 — Drilling Hazards Summary
(To be posted in Rig Floor Doghouse Prior to Spud)
13-1/2" Hole / 10-3/4" Casing Interval
Event
Risk Level
Mitigation Strategy
Conductor Broach
Low
Monitor cellar continuously during interval.
Well Collision
Low
Gro single shots, traveling cylinder diagrams
Abnormal Reservoir Pressure
Low
Monitor well at base of permafrost, increased mud weight, decreased
Gas Hydrates
Low
mud viscosity, increased circulating times, controlled drilling rates,
Abnormal Reservoir Pressure
Low
low mud temperatures
Running Sands and Gravel
Low
Maintain planned mud parameters, Increase mud weight, use
Hydrogen Sulfide gas
Low
weighted sweeps.
Lost Circulation
Low
Reduced pump rates, mud rheology, lost circulation material, use of
low density cement slurries
9-7/8" x 11" Hole / 7-5/8" Casing Interval
Event
Risk Level
Mitigation Strategy
Lost circulation
Low
Reduced pump rates, reduced trip speeds, real time equivalent
Lost circulation
Low
circulating density (ECD) monitoring, mud rheology, lost circulation
Abnormal Reservoir Pressure
Low
material
Hole swabbing on tris
Low
Annular pressure applied by managed pressure drilling equipment.
Abnormal Reservoir Pressure
Low
Well control drills, increased mud weight. No mapped faults occur
across the path of the planned wellbore.
Hydrogen Sulfide gas
Low
H2S drills, detection systems, alarms, standard well control practices,
mud scavengers
6-1/2" Open Hole Production Interval (C Sand)
Event
Risk Level
Mitigation Strategy
Lost circulation
Low
Reduced pump rates, reduced trip speeds, real time equivalent
circulating density (ECD) monitoring, mud rheology, lost circulation
material
Hole swabbing on tris
Low
Annular pressure applied by managed pressure drilling equipment.
Abnormal Reservoir Pressure
Low
Well control drills, increased mud weight.
Hydrogen Sulfide gas
Low
H2S drills, detection systems, alarms, standard well control practices,
mud scavengers
CD5-98L1 APD
Page 11 of 15
Printed., 11 -Apr -19
Application .,,. Permit to Drill, Well CRU CD5-981-1
Saved: 11 -Apr -19
Well Proximitv Risks:
Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following
attachments.
Drilling Area Risks:
Reservoir Pressure: Offset production has the potential to reduce the reservoir pressure. LCM material will be on
location to deal with losses.
Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the
intermediate section.
Lower Shale Stability: HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud
weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore
strengthening pills are expected to be effective in dealing with lost circulation if needed.
CD5-98L1 APD
Page 12 of 15
Printed: 11 -Apr -19
Applicatior, . -, Permit to Drill, Well CRU CD5-9811
Saved: 11 -Apr -19
Attachment 3 — Completion Schematic
CD5 - 98 Alpine A/C Dual Lateral Producer
Proposed Schematic
TNT Production Pa
at 13,720' MD
HP Skiing sleeve for
Selectivity
13,800' MD
C sand Lateral
4-%"x 1" GLM 6 1/2" Hole TD
13,820'- 30,708' MD
4-%" 12.6# L-00 Hyd563 Liner w/ pert pups
0 0 0 0 0 0 0 0
------------------------------. ----
4-%x" 12.6# L-80 M
3-1/2" 9.3# TNNOSS TNT Production Packer A sand Lateral
at 6 12" Hole TD
14,000' MD ZXP liner top packer 141205' — 31,844' MD
at 14,055' MD
Liner w/ frac ports
I®
---------------
3-1/2"
.-...___.._
CD5-98L1 APD
Page 13 of 15
Printed: 11 -Apr -19
20" 94# H-40 Welded Upper Completion:
Conductor to 115' MD 1) 4 %"-12.69 Hyd563 tubing
2) Shallow nipple profile 3.813" ID
3) 4-11W x 1" Camco KBMG GLM (xx°) w/DCK2
I
pinned for 2500 psi casing to tbg shear
4) SLB DHG
12
5)TNT Packer
I
6) X Nipple profile, 2.813"
7) TNT Packer
I
: 10-3/4" 45.5# L410 HYD 563 x 8)X Nipple profile, 2.813"
BTC Lower Completion:
Surface Casing at 2,296' MD
8) Plop and drop liner in C sand
- no junction
-4.5" 12.6# L-80 w/ pert pups
I
9) ZXP liner top packer 8 Flexlock Liner Hanger
4-%" x 1" GLM 9
I
XO 5" Hyddl 521 Box X 4-111V H563 pin
I
I
I
-4.5" Hydril563 12.6# L-80 w/ Frac Ports
I
I
I
I
I
I
4-112" 126# L•80 Hyd563
I
I
I
I
4-1/:" x 1" GLM
I
I
7 5/8" 29.7# L-80 TXP
I
Intermediate Casing at 14,205' MD
TNT Production Pa
at 13,720' MD
HP Skiing sleeve for
Selectivity
13,800' MD
C sand Lateral
4-%"x 1" GLM 6 1/2" Hole TD
13,820'- 30,708' MD
4-%" 12.6# L-00 Hyd563 Liner w/ pert pups
0 0 0 0 0 0 0 0
------------------------------. ----
4-%x" 12.6# L-80 M
3-1/2" 9.3# TNNOSS TNT Production Packer A sand Lateral
at 6 12" Hole TD
14,000' MD ZXP liner top packer 141205' — 31,844' MD
at 14,055' MD
Liner w/ frac ports
I®
---------------
3-1/2"
.-...___.._
CD5-98L1 APD
Page 13 of 15
Printed: 11 -Apr -19
d
z
to
s
March O6 2019
CD5-98L1 wp04.1
K assured [ecth
75/8 x 11 Flan 125 C< 74 70usft (1251
41-
1
0 9� T' N ^ m o iN o N N 1/o x601/.I
o A 33�
o 0 0 0 0 0
0 0
0 0
N
N
900
DDI
7.615 plan Summ
0
�t----
CS -97 (ItE-P1 xg04. a
0
1380
Sec MD Inc Ad
12000 15000 18000 21000
24000 27000
33G 30
CYC -CI E
13224 -
14444
113820.00 73.49 14RW
7449.48
5251.39
-524287 0.00
1400 -
I'ts0
horizontal [ocadure
213812.8] 75.34 139.11
g
5242.01
14190 -
14318
Had far W'
2290.0013820.00 CC599111E-A vw4.1
KV[+IFF-PX-CP7 EC
TQC KC
Pane
143]0 -
14558
Slxd 4.W11WME, 543' TF, W 51548'
138220.0014350.00 CIE: LI xu04
IPC.TFEKC
7449,6913821...
7 `E78 x 11
543 -5957,00
Hold fa 16.11'
514394.39100.39 14146
14350.0015750.00 CCS-98LI vn04
K V C
7594.70 3C7CPFG
4-1]2 6-1]2
h 4)IOCITLS, 135' TF, br 31273
Sb.W
K
EC C A 2018 01
14350 00 30708,50 C[5-9811 04
KV CdFF-PX-CP3-E(
14550
14140
Had ha 16%01W
R aonetic odel 8late:
-Jul -19
7%1.70
-959752
27189 CA
OW 9974.57 CDS%L12Toe1224eJ1-1
TD: 307085'K9,]594.TM
300
60
14]40 -
14920
14920
15100
15100
15758
15]50
1£408
16400
17050
17850
17]00
te35g
18350
19000
190o
19fi50
19650 -
20300
Ins.
21600
2100 -
22900
14000
14175
14350
14525
14700
14875
15050
240
120
zzsoo -
24200
24£00 -
25500
K assured [eoth
25WO -'26710
£urlace Location
26610
46110
Ceolh F. Cwh To E Ivev7FWn
Tool
hacked by
cceoted by
210
Sec MD Inc Ad
150
2811➢ -- 29410
40.80 190.0 ..508111E-11 x c04.1
CYC -CI E
Macaroni
J. Fvan
113820.00 73.49 14RW
7449.48
5251.39
-524287 0.00
29410 - 30709
1900.00 2293.0 CC& as II1FP1 xc04.1
6V CH4-PX-CP2E(
213812.8] 75.34 139.11
]452.92
5242.01
180
648(145
Had far W'
2290.0013820.00 CC599111E-A vw4.1
KV[+IFF-PX-CP7 EC
TQC KC
Pane
-525587 0.00
OW -645418
Slxd 4.W11WME, 543' TF, W 51548'
138220.0014350.00 CIE: LI xu04
IPC.TFEKC
7449,6913821...
7 `E78 x 11
543 -5957,00
Hold fa 16.11'
514394.39100.39 14146
14350.0015750.00 CCS-98LI vn04
K V C
7594.70 3C7CPFG
4-1]2 6-1]2
h 4)IOCITLS, 135' TF, br 31273
Sb.W
K
EC C A 2018 01
14350 00 30708,50 C[5-9811 04
KV CdFF-PX-CP3-E(
474974 4.88
x
Had ha 16%01W
R aonetic odel 8late:
-Jul -19
Ev sanino this I acknov leads that I have been Infom ad of all disks. checked that the data is correct. ensured It can cleteness. and 87
surrounding v are are assigned to the cromr eesition. and 1 amrove the scan and collision avoidance clan as set out in Me audit nark.!
Warove It as Me basis for the final v ell clan and v ellsits dray inns. I also ackncv ledge Nat unless notified olhery ise all targets have a 100
feet lateral tolerance.
reeared by
hacked by
cceoted by
K aonetic h Orth is 16.071 East of True Korth (K aonetic [eclination)
K aonetic [ic 8 Field Etrenath: 80.72° 57373nT
Sec MD Inc Ad
m
AWS
AFP -W Dle9
TFaw VSea Tarot
Macaroni
J. Fvan
113820.00 73.49 14RW
7449.48
5251.39
-524287 0.00
O.W 649165
KOP: 15.9'fi00ME, -26°TF, br 128'
Lllholcov Colunn
213812.8] 75.34 139.11
]452.92
5242.01
-52]4.8] 15.902500
648(145
Had far W'
313862.W 75.M 139.11
]40.52
522106
-525587 0.00
OW -645418
Slxd 4.W11WME, 543' TF, W 51548'
414378.28 100.39 14146
7479.55
4828.95
4929,12 4.00
543 -5957,00
Hold fa 16.11'
514394.39100.39 14146
]476.65
014.55
491954 0.00
(100-54!238
h 4)IOCITLS, 135' TF, br 31273
Sb.W
814]0].12 8948 152.18
]449.70
4554.43
474974 4.88
1350056!585 CD5981-11. HadIn418 JH
Had ha 16%01W
730708.50 8948 152.18
7%1.70
-959752
27189 CA
OW 9974.57 CDS%L12Toe1224eJ1-1
TD: 307085'K9,]594.TM
Ev sanino this I acknov leads that I have been Infom ad of all disks. checked that the data is correct. ensured It can cleteness. and 87
surrounding v are are assigned to the cromr eesition. and 1 amrove the scan and collision avoidance clan as set out in Me audit nark.!
Warove It as Me basis for the final v ell clan and v ellsits dray inns. I also ackncv ledge Nat unless notified olhery ise all targets have a 100
feet lateral tolerance.
reeared by
hacked by
cceoted by
Peeroved bv:
S. CeLacc
J. Fvan
P. Conat
CD5-98L1 wp04.1
I II,
20 _
0
I
I
,000
,0-3/4
x 13-1/2 )ICO
I
i
L 2500
u
e
U
O
0
O
J
r
O D° O
Ol
O O O
o
N
u
5000
bO
0 O
4-1/2 x s-1 /2
r
$�o
I 0 7-5/8 x 11
i '
^
'���
O
�O
7500
7-5/8 x 9-7/8 6v 11
4-1/2 x 6-1 /2
1CC00
-7500 -5000 -2500 0 2500 5000 7500 10000
bertical Eecticn at 164.20'
s
CD5-98L1 w 04.1
While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise.
0
7-5/8 x 11-
1
7 -5/8
7-5/8 x 9-7/8 6v 11 4�0
3000
p00
_._._.__'.. __� _._.10 3/4
, 11 4p x 13-1/2
O
1000 b000
',,.
0
000 I
^�
19
0
20
0 I
2g
93000---
vi
2y000 '!.
�'I
260p0
-6000
,N�1 2a000 1 SpA
0 90
goo -
2
o1/2
a,
=0
� g
O' O 4
-9000
t��
.P\—.. ,-
-.._� _
4 -1/2x6 -l/2--- 90& x 6 1/2 -----
-
I
-
-12000 -9000. -6000 -3000 0 3000 6000 9000
V est(-)/East(41
ConocoPhillips Alaska Inc_WNS
Western North Slope
CD5 Alpine West Pad
Plan: CD5-98 (11 B) - Slot 98
50103xxxxx00
CD5-981-1
Plan: CD5-981-1 wp04
Standard Proposal Report
11 April, 2019
ConocoPhillips
ConocoPhillips
Database:
OAKEDMPI
Company:
ConocoPhillips Alaska lnc_WNS
Project:
Western North Slope
Site:
CD5 Alpine West Pad
Well:
Plan: CD5-98 (11B)
Wellbore:
CD5-9BL1
Design:
CD5-981_1 wp04
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
ConocoPhillips
Standard Proposal Report
Well Plan: C05-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (D25)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
Project Western North Slope, North Slope Alaska, United States
Map System: System Datum: Mean Sea Level
Geo Datum: Using Well Reference Point
Map Zone: Using geodetic scale factor
sfte CD5 Alpine West Pad
Site Position: Northing: Latitude;
From: Map Easting: Longitude:
Position Uncertainty: 0 00 usft Slot Radius: 13.200 in Gdtl Convergence:
Plan survey Tool Program Date 4/11/2019
Depth From Depth To
(usft) (usft) Survey (Wellbore)
1 13,820.00 14,350.00 CD5-98L1 wp04 (C135-981-1)
2 14,350.00 15,850.00 CD5-981_1 wp04 (CD5-98L1)
3 14,350.00 30,708.50 CD5-981_1 wp04 (CD5-981.1)
Latitude:
Longitude:
0.00 usft Ground Level:
Dip Angle
16.07 80.72
-1.15 °
33.90 usft
Field Strength
(n T)
57,373
Tie On Depth:
13,820.00
+E/ -W
Direction
Well
Plan: CD5-98 (11 B) - Slot 98
Well Position
+N/ -S Northing:
J
+E/ -W Easting:
Position Uncertainty
0.00 usft Wellhead Elevation:
Wellbore
CD5-98L1
Magnetics
Model Name Sample Dale
Declination
BGGM2018 7/1/2019
Design
CD5-98L1 wp04 - —
_—
Audit Notes:
Version:
Phase: PLAN
Vertical Section:
Depth From (TVD)
+N/ -S
(usft)
(usft)
40.80
0.00
Plan survey Tool Program Date 4/11/2019
Depth From Depth To
(usft) (usft) Survey (Wellbore)
1 13,820.00 14,350.00 CD5-98L1 wp04 (C135-981-1)
2 14,350.00 15,850.00 CD5-981_1 wp04 (CD5-98L1)
3 14,350.00 30,708.50 CD5-981_1 wp04 (CD5-981.1)
Latitude:
Longitude:
0.00 usft Ground Level:
Dip Angle
16.07 80.72
-1.15 °
33.90 usft
Field Strength
(n T)
57,373
Tie On Depth:
13,820.00
+E/ -W
Direction
(usft)
0.00
164.20
J
Tool Name Remarks
INC -TREND
Inclinometer +known azi trend
MWD
MWD - Standard
MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
411112019 9:11:41AM Page 2 COMPASS 5000.14 Build 85D
ConocoPhillips
Database:
Company:
Project:
Site:
Well:
Wellbore:
Design:
Plan Sections
Measured
Depth
(usft)
13,820.00
13,832.80
13,862.80
14,378.28
14,394.39
14,707.12
30,708.50
OAKEDMPI
ConocoPhillips Alaska Inc_WNS
Western North Slope
CDS Alpine West Pad
Plan: CD5-98 (11 B)
CD5-98L1
CD5-98L1 wp04
Inclination Azimuth
73.49
140.00
75.34
139.11
75.34
139.11
100.39
141.46
100.39
141.46
89.48
152.18
89.48
152.18
Vertical
Build
Depth
+N/ -S
(usft)
(usft)
7,449.48
5,251.39
7,452.92
5,242.01
7,460.52
5,220.06
7,479.56
4,826.95
7,476.65
4,814.55
7,449.70
4,554.43
7,594.70
-9,597.52
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
+EI -W
(usft)
-5,282.87
-5,274.87
-5,255.87
-4,929.42
-4,919.54
-4,749.74
2,716.55
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (D25)
Plan D25 @ 74.70usft (025)
True
Minimum Curvature
Dogleg
Build
Turn
Rate
Rate
Rate
(°1100usft)
(°1100usft)
(°1100usft)
0.00
a00
0.00
15.90
14.42
46.94
0.00
0.00
0.00
4.88
4.86
0.45
0.00
0.00
0.00
4.88
-3.49
3.43
0.00
0.00
0.00
TFO
(°) Target
0.00
-25.00
0.00
5.43
0.00
135.00 CD5-981-1 T01 Heel 1
0.00 CD5-981-1 T02 Toe 1:
4/112019 9:11:41AM Page 3 COMPASS 5000.14 Build 85D
ConocoPhillips
ConocoPhillips
Standard Proposal Report
Database:
OAKEDMPI
Local Co-ordinate Reference:
Well Plan: CDS-98(11 B) - Slot 98
Company:
ConocoPhillips Alaska Inc_WNS
TVD Reference:
Plan D25 @
74.70usft (D25)
Project.
Western North
Slope
MD Reference:
Plan D25 Q
74.70usft (D25)
Site:
CD5 Alpine West Pad
North Reference:
True
Well:
Plan: CD5-98 (11
B)
Survey
Calculation Method:
Minimum Curvature
Wellbore:
CD5-98L1
Design:
CD5-98Li wp04
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Turn
Depth
Inclination
Azimuth
Depth
-NI-S
-E/.W
Section
Rate
Rate
Rate
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100usft)
(°1100usft)
(°1100usft)
13,820.00
73.49
140.00
7,449.48
5,251.39
-5,282.87
5,491.85
0.00
0.00
0.00
KOP: 15.9°/100' DLS, -25° TF,
for 12.8'
13,821.00
73.64
139.93
7,449.77
5,250.65
-5,282.25
£,490.78
15.90
14.41
-7.00
7-518 z 11
13,832.80
75.34
139.11
7,452.92
5,242.01
-5,274.87
5,480.45
15.90
14.43
-6.94
Hold for 30'
13,862.80
75.34
139.11
7,460.52
5,220.06
-5,255.87
5,454.16
0.00
0.00
0.00
Start 4.88°1100' DLS, 5.43° TF, for 515.48'
13,900.00
77.15
139.29
7,469.36
5,192.71
-5,232.26
-6,421.42
4.88
4.86
0.47
14,000.00
82.01
139.75
7,487.44
5,117.93
-5,168.43
.6,332.07
4.88
4.86
0.46
14,100.00
86.87
140.20
7,497.13
5,041.73
-5,104.45
.6,241.33
4.88
4.86
0.45
14,200.00
91.73
140.65
7,498.36
4,964.68
-5,040.76
-6,149.85
4.88
4.86
0.45
14,300.00
96.59
141.10
7,491.11
4,887.34
-4,977.84
-6,058.29
4.88
4.86
0.45
14,378.28
100.39
141.46
7,479.56
4,826.95
4,929.42
-5,987.00
4.88
4.86
0.46
Hold for 16.11'
14,394.39
100.39
141.46
7,476.65
4,814.55
4,919.54
-5,972.38
0.00
0.00
0.00
Start 4.88°1100' DLS, 135° TF, for 312.73'
14,400.00
100.20
141.65
7,475.65
4,810.23
4,916.11
.5,967.29
4.88
-3.45
3.51
14,500.00
96.73
145.12
7,460.93
4,730.85
-4,857.15
-5,874.85
4.88
-3.47
3.47
14,600.00
93.24
148.55
7,452.24
4,647.48
-4,802.67
-5,779.60
4.88
-3.49
3.42
14,700.00
89.73
151.94
7,449.65
4,560.72
-4,753.08
-5,682.81
4.88
-3.51
3.40
14,707.12
69.48
152.18
7,449.70
4,554.43
4,749.74
5,675.85
4.88
-3.51
3.39
Hold for 16001.38'
14,800.00
89.48
152.18
7,450.54
4,472.28
4,706.40
5,585.00
0.00
0.00
0.00
14,900.00
69.48
152.18
7,451.45
4,383.84
4,659.74
5,487.20
0.00
0.00
0.00
15,000.00
89.48
152.18
7,452.35
4,295.40
-4,613.08
-5,389.39
0.00
0.00
0.00
15,100.00
89.48
152.18
7,453.26
4,206.96
-4,566.42
-5,291.58
0.00
0.00
0.00
15,200.00
89.48
152.18
7,454.17
4,118.52
-4,519.76
-5,193.78
0.00
0.00
0.00
15,300.00
8948
152.18
7,455.07
4,030.07
-4,473.10
-5,095.97
0.00
0.00
0.00
15,400.00
89.48
152.18
7,455.98
3,941.63
-4,426.44
4,998.16
0.00
0.00
0.00
15,500.00
89.48
152.18
7,456.89
3,653.19
4,379.78
4,900.36
0.00
0.00
0.00
15,600.00
89.48
152.18
7,457.79
3,764.75
4,333.12
4,802.55
0.00
0.00
0.00
15,700.00
89.48
152.18
7,458.70
3,676.31
-4,286.46
4,704.74
0.00
0.00
0.00
15,800.00
89.48
152.18
7,459.60
3,587.86
4,239.80
4,606.94
0.00
0.00
0.00
15,900.00
89.48
152.18
7,460.51
3,499.42
4,193.14
4,509.13
0.00
0.00
0.00
16,000.00
89.48
152.18
7,461.42
3,410.98
4,146.48
4,411.32
0.00
0.00
0.00
16,100.00
89.48
152.18
7,462.32
3,322.54
4,099.82
-4,313.52
0.00
0.00
0.00
16,200.00
89.48
152.18
7,463.23
3,234.10
4,053.16
4,215.71
0.00
0.00
0.00
16,300.00
89.48
152.18
7,464.13
3,145.65
4,006.50
4,117.90
0.00
0.00
0.00
16,400.00
89.48
152.18
7,465.04
3,057.21
-3,959.84
4,020.10
0.00
0.00
0.00
16,500.00
89.48
152.18
7,465.95
2,968.77
-3,913.18
-3,922.29
0.00
0.00
0.00
16,600.00
89.48
152.18
7,466.85
2,880.33
-3,866.52
-3,824.48
0.00
0.00
0.00
16,700.00
89.48
152.18
7,467.76
2,791.89
-3,819.86
-3,726.68
0.00
0.00
0.00
16,800.00
89.48
152.18
7,468.67
2,703.44
-3,773.20
-3,628.87
0.00
0.00
0.00
16,900.00
89.48
152.18
7,469.57
2,615.00
-3,726.54
-3,531.06
0.00
0.00
0.00
17,000.00
89.48
152.18
7,470.48
2,526.56
-3,679.88
-3,433.26
0.00
0.00
0.00
17,100.00
89.48
152.18
7,471.38
2,438.12
-3,633.22
3,335.45
0.00
0.00
0.00
17,200.00
89.48
152.18
7,472.29
2,349.68
-3,586.56
-3,237.64
0.00
0.00
0.00
17,300.00
89.48
152.18
7,473.20
2,261.23
-3,539.90
-3,139.84
0.00
0.00
0.00
17,400.00
89.48
152.18
7,474.10
2,172.79
-3,493.24
-3,042.03
0.00
0.00
0.00
17,500.00
89.48
152.18
7,475.01
2,084.35
-3,446.57
-2,944.22
0.00
0.00
0.00
17,600.00
89.48
152.18
7,475.91
1,995.91
-3,399.91
-2,846.42
0.00
0.00
0.00
17700.00
89.48
152.18
7,476.82
1,91)7.46
-3,353.25
-2,748.61
0.00
0.00
0.00
411112019 9: 11:41AM Page 4 COMPASS 5000.14 Build 850
ConocoPhillips
ConocoPhillips Standard Proposal Report
Database:
OAKEDMPI
Local Co-ordinate Reference:
Well Plan: CDS-98(11 B) - Slot 98
Company:
ConocoPhillips Alaska Inc_WNS
TVD Reference:
Plan D25 @ 74.70usft (D25)
Project:
Western North Slope
MD Reference:
Plan D25 @ 74.70usft (D25)
Site:
CDS Alpine West Pad
North Reference:
True
Well:
Plan: CD5-98 (11 B)
Survey Calculation Method:
Minimum Curvature
Wellbore:
CD5-98L1
Azimuth
Depth
Design:
CD5-9811 wp04
Section
Rate
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Nm
Depth
Inclination
Azimuth
Depth
+NIS
+El -W
Section
Rate
Rate
Rate
(usft)
(°)
(°)
(usft)
(usft)
(usft)
(usft)
(°1100usR)
(°1100usft)
(°1100usft)
17,800.00
89.48
152.18
7477.73
1,819.02
-3,306.59
-2,650.80
0.00
0.00
0.00
17,900.00
89.48
152.18
7,478.63
1,730.58
-3,259.93
-2,553.00
0.00
0.00
0.00
18,000.00
89.48
152.18
7,479.54
1,642.14
-3,213.27
-2,455.19
0.00
0.00
0.00
18,100.00
89.48
152.18
7,480.45
1,553.70
-3,166.61
-2,357.38
0.00
0.00
0.00
18,200.00
89.48
152.18
7,481.35
1,465.25
3,119.95
-2,259.58
0.00
0.00
0.00
18,300.00
89.48
152.18
7,482.26
1,376.81
-3,073.29
-2,161.77
0.00
0.00
0.00
18,400.00
89.48
152.18
7,483.16
1,288.37
-3,026.63
-2,063.96
0.00
0.00
0.00
18,500.00
89.48
152.18
7,484.07
1,199.93
-2,979.97
-1,966.16
0.00
0.00
0.00
18,600.00
89.48
152.18
7,484.98
1,111.49
-2,933.31
-1,868.35
0.00
0.00
0.00
18,700.00
89.48
152.18
7,485.88
1,023.04
-2,886.65
-1,770.54
0.00
0.00
0.00
18,800.00
89.48
152.18
7,486.79
934.60
-2,839.99
-1,672.74
0.00
0.00
0.00
18,900.00
89.48
152.18
7,487.69
846.16
-2,793.33
-1,574.93
0.00
0.00
0.00
19,000.00
89.48
152.18
7,488.60
757.72
-2,746.67
-1,477.12
0.00
0.00
0.00
19,100.00
89.48
152.18
7,489.51
669.28
-2,700.01
-1,379.32
0.00
0.00
0.00
19,200.00
89.48
152.18
7,490.41
580.83
-2,653.35
-1,281.51
0.00
0.00
0.00
19,300.00
89.48
152.18
7,491.32
492.39
-2,606.69
-1,183.70
0.00
0.00
0.00
19,400.00
89.48
152.18
7,492.23
403.95
-2,560.03
-1,085.90
0.00
0.00
0.00
19,500.00
89.48
152.18
7,493.13
315.51
-2,513.37
-988.09
0.00
0.00
0.00
19,600.00
89.48
152.18
7,494.04
227.07
-2,466.71
390.28
0.00
0.00
0.00
19,700.00
89.48
152.18
7,494.94
138.62
-2,420.05
-792.48
0.00
0.00
0.00
19,800.00
89.48
152.18
7,495.85
50.18
-2,373.39
-694.67
0.00
0.00
0.00
19,900.00
89.48
152.18
7,496.76
38.26
-2,326.73
-596.86
0.00
0.00
0.00
20,000.00
89.48
152.18
7,497.66
-126.70
-2,280.07
-499.06
0.00
0.00
0.00
20,100.00
89.48
152.18
7,498.57
-215.14
-2,233.41
-401.25
0.00
0.00
0.00
20,200.00
89.48
152.18
7,499.48
-303.59
-2,186.75
-303.44
0.00
0.00
0.00
20,300.00
89.48
152.18
7,500.38
-392.03
-2,140.09
-205.64
0.00
0.00
0.00
20,400.00
89.48
152.18
7,501.29
480.47
-2,093.43
-107.83
0.00
0.00
0.00
20,500.00
89.48
152.18
7,502.19
-568.91
-2,046.77
-10.02
0.00
0.00
0.00
20,600.00
89.48
152.18
7,503.10
-657.35
-2,000.11
87.78
0.00
0.00
0.00
20,700.00
89.48
152.18
7,504.01
-745.80
-1,953.45
185.59
0.00
0.00
0.00
20,800.00
89.48
152.18
7,504.91
-834.24
-1,906.79
283.40
0.00
0.00
0.00
20,900.00
89.48
152.18
7,505.82
-922.68
-1,860.13
381.20
0.00
0.00
0.00
21,000.00
89.48
152.18
7,506.72
-1,011.12
-1,813.47
479.01
0.00
0.00
0.00
21,100.00
89.48
152.18
7,507.63
-1,099.57
-1,766.80
576.82
0.00
0.00
0.00
21,200.00
89.48
152.18
7,508.54
-1,188.01
-1,720.14
674.62
0.00
0.00
0.00
21,300.00
89.48
152.18
7,509.44
-1,276.45
-1,673.48
772.43
0.00
0.00
0.00
21,400.00
89.48
152.18
7,510.35
-1,364.89
-1,626.82
870.24
0.00
0.00
0.00
21,500.00
89.48
152.18
7,511.26
-1,453.33
-1,580.16
968.04
0.00
0.00
0.00
21,600.00
89.48
152.18
7,512.16
-1,541.78
-1,533.50
1,065.85
0.00
0.00
0.00
21,700.00
89.48
152.18
7,513.07
-1,630.22
-1,486.84
1,163.66
0.00
0.00
0.00
21,800.00
89.48
152.18
7,513.97
-1,718.66
-1,440.18
1,261.46
0.00
0.00
0.00
21,900.00
89.48
152.18
7,514.88
-1,807.10
-1,393.52
1,359.27
0.00
0.00
0.00
22,000.00
89.48
152.18
7,515.79
-1,895.54
-1,346.86
1,457.08
0.00
0.00
0.00
22,100.00
89.48
152.18
7,516.69
-1,983.99
-1,300.20
1,554.88
0.00
0.00
0.00
22,200.00
89.48
152.18
7,517.60
-2,072.43
-1,253.54
1,652.69
0.00
0.00
0.00
22,300.00
89.48
152.18
7,518.50
-2,160.87
-1,206.88
1,750.50
0.00
0.00
0.00
22,400.00
89.48
152.18
7,519.41
-2,249.31
-1,160.22
1,848.30
0.00
0.00
0.00
22,500.00
89.48
152.18
7,520.32
-2,337.75
-1,113.56
1,946.11
0.00
0.00
0.00
22,600.00
89.48
152.18
7,521.22
-2,426.20
-1,066.90
2,043.92
0.00
0.00
0.00
22,700.00
89.48
152.18
7,522.13
-2,514.64
-1,020.24
2,141.72
0.00
0.00
0.00
22,800.00
89.48
152.18
7,523.04
-2,603.08
-973.58
2,239.53
0.00
0.00
0.00
22,900.00
89.48
152.18
7,523.94
-2,691.52
-926.92
2,337.34
0.00
0.00
0.00
23,000.00
89.48
152.18
7,524.85
-2,779.96
-880.26
2,435.14
0.00
0.00
0.00
23,100.00
89.48
152.18
7,525.75
-2,868.41
-833.60
2,532.95
0.00
0.00
0.00
41112019 9:11:41AM Page 5 COMPASS 5000.14 Build 85D
ConocoPhillips
Database:
OAKEDMPl
Local Co-ordinate Reference:
Company:
ConocoPhillips Alaska Inc WNS
TVD Reference:
Project
Western North Slope
MD Reference:
Site:
CD5 Alpine West Pad
North Reference:
Well:
Plan: CD5-98 (11 B)
Survey Calculation Method:
Wellbore:
CD5-9811
Dogleg
Design:
CD5-9811 wp04
Depth
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (1325)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Turn
Depth
Inclination
Azimuth
Depth
+N/.S
+El -W
Section
Rate
Rate
Rate
(usft)
(^)
(_)
(usft)
(usft)
(usft)
(usft)
(°/100usR)
("NOOusft)
(°1100usft)
23,200.00
8948
152.18
7,526.66
-2,956.85
-786.94
2,630.76
0.00
0.00
0.00
23,300.00
89.48
152.18
7,527.57
-3,045.29
-740.28
2,728.56
0.00
0.00
0.00
23,400.00
89.48
152.18
7,528.47
-3,133.73
-693.62
2,626.37
0.00
0.00
0.00
23,500.00
89.48
152.18
7,529.38
-3,222.17
-646.96
2,924.18
0.00
0.00
0.00
23,600.00
89.48
152.18
7,530.28
-3,310.62
-600.30
3,021.98
0.00
0.00
0.00
23,700.00
89.48
152.18
7,531.19
-3,399.06
-553.64
3,119.79
0.00
0.00
0.00
23,800.00
89.48
152.18
7,532.10
-3,487.50
-506.98
3,217.60
0.00
0.00
0.00
23,900.00
89.48
152.18
7,533.00
-3,575.94
460.32
3,315.40
0.00
0.00
0.00
24,000.00
89.48
152.18
7,533.91
-3,664.39
Al 166
3,413.21
0.00
0.00
0.00
24,100.00
89.48
152.18
7,534.62
-3,752.83
-367.00
3,511.02
0.00
0.00
0.00
24,200.00
89.48
152.18
7,535.72
-3,841.27
-320.34
3,608.82
0.00
0.00
0.00
24,300.00
89.48
152.18
7,536.63
-3,929.71
-273.68
3,706.63
0.00
0.00
0.00
24,400.00
89.48
152.18
7,537.53
4,018.15
-227.02
3,804.44
0.00
0.00
0.00
24,500.00
89.48
152.18
7,538.44
4,106.60
-180.36
3,902.24
0.00
0.00
0.00
24,600.00
89.48
152.18
7,539.35
4,195.04
-133.70
4,000.05
0.00
0.00
0.00
24,700.00
89.48
152.18
7,540.25
-0,283.48
-87.04
4,097.86
0.00
0.00
0.00
24,800.00
89.48
152.18
7,541.16
4,371.92
40.37
4,195.66
0.00
0.00
0.00
24,900.00
89.48
152.18
7,542.07
4,460.36
6.29
4,293.47
0.00
0.00
0.00
25,000.00
89.48
152.18
7,542.97
4,548.67
52.95
4,391.28
0.00
0.00
0.00
25,100.00
89.48
152.18
7,543.88
4,637.25
99.61
4,489.08
0.00
0.00
0.00
25,200.00
89.48
152.18
7,544.78
4,725.69
146.27
4,566.89
0.00
0.00
0.00
25,300.00
89.48
152.18
7,545.69
4,814.13
192.93
4,684.70
0.00
0.00
0.00
25,400.00
89.48
152.18
7,546.60
4,902.57
239.59
4,782.50
0.00
0.00
0.00
25,500.00
89.48
152.18
7,547.50
4,991.02
286.25
4,880.31
0.00
0.00
0.00
25,600.00
89.48
152.18
7,548.41
-5,079.46
332.91
4,978.12
0.00
0.00
0.00
25,700.00
89.48
152.18
7,549.31
-5,167.90
379.57
5,075.92
0.00
0.00
0.00
25,800.00
89.48
152.18
7,550.22
-5,256.34
426.23
5,173.73
0.00
0.00
0.00
25,900.00
89.48
152.18
7,551.13
-5,344.78
472.89
5,271.54
0.00
0.00
0.00
26,000.00
89.48
152.18
7,552.03
-5,433.23
519.55
5,369.34
0.00
0.00
0.00
26,100.00
89.48
152.18
7,552.94
5,521.67
566.21
5,467.15
0.00
0.00
0.00
26,200.00
89.48
152.18
7,553.85
-5,610.11
612.87
5,564.96
0.00
0.00
0.00
26,300.00
69.48
152.18
7,554.75
-5,698.55
659.53
5,662.76
0.00
0.00
0.00
26,400.00
89.48
152.18
7,555.66
-5,786.99
706.19
5,760.57
0.00
0.00
0.00
26,500.00
8948
152.18
7,556.56
-5,875.44
752.85
5,858.38
0.00
0.00
0.00
26,600.00
89.48
152.18
7,557.47
-5,963.88
799.51
5,956.18
0.00
0.00
0.00
26,700.00
89.48
152.18
7,558.38
-6,052.32
846.17
6,053.99
0.00
0.00
0.00
26,800.00
89.48
152.18
7,559.28
-6,140.76
892.83
6,151.80
0.00
0.00
0.00
26,900.00
89.48
152.18
7,560.19
-6,229.20
939.49
6,249.60
0.00
0.00
0.00
27,000.00
89.48
152.18
7,561.09
-6,317.65
986.15
6,347.41
0.00
0.00
0.00
27,100.00
89.48
152.18
7,562.00
5,406.09
1,032.81
6,445.22
0.00
0.00
0.00
27,200.00
89.48
152.18
7,562.91
-6,494.53
1,079.47
6,543.02
0.00
0.00
0.00
27,300.00
89.48
152.18
7,563.81
-6,582.97
1,126.13
6,640.83
0.00
0.00
0.00
27,400.00
89.48
152.18
7,564.72
-6,671.42
1,172.79
6,738.64
0.00
0.00
0.00
27,500.00
69.48
152.18
7,565.63
-6,759.86
1,219.45
6,836.44
0.00
0.00
0.00
27,600.00
89.48
152.18
7,566.53
-6,848.30
1,266.11
6,934.25
0.00
0.00
0.00
27,700.00
89.48
152.18
7,567.44
-6,936.74
1,312.77
7,032.06
0.00
0.00
0.00
27,800.00
89.48
152.18
7,568.34
-7,025.18
1,359.43
7,129.86
0.00
0.00
0.00
27,900.00
89.48
152.18
7,569.25
-7,113.63
1,406.09
7,227.67
0.00
0.00
0.00
28,000.00
89.48
152.18
7,570.16
-7,202.07
1,452.75
7,325.48
0.00
0.00
0.00
28,100.00
89.48
152.18
7,571.06
-7,290.51
1,499.41
7,423.28
0.00
0.00
0.00
28,200.00
89.48
152.18
7,571.97
-7,378.95
1,546.07
7,521.09
0.00
0.00
0.00
28,300.00
89.48
152.18
7,572.88
-7,467.39
1,592.73
7,618.90
0.00
0.00
0.00
28,400.00
89.48
152.18
7,573.78
-7,555.84
1,639.40
7,716.70
0.00
0.00
0.00
28,500.00
89.48
152.18
7,574.69
-7,644.28
1,686.06
7,814.51
0.00
0.00
0.00
4/11/2019 9:11:41AM Page 6 COMPASS 5000.14 Build 85D
ConocoPhillips
Database:
CAKEDMPI
Company:
ConocoPhillips Alaska Inc WNS
Project:
Western North Slope
Site:
CD5 Alpine West Pad
Well:
Plan: CD5-98 (11B)
Wellbore:
CD5-98L1
Nat„n•
CD5-981_1 wD04
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (D25)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
Planned Survey
Measured
Vertical
Vertical
Dogleg
Build
Turn
Depth Inclination
Azimuth
Depth
-N/,S
+E/ -W
Section
Rate
Rate
Rate
(usft) C)
C)
(usft)
(usft)
(usft)
(usft)
(-/100usft)
("1100nsft)
(°1100usft)
28,600.00
89.48
152.18
7,575.59
-7,732.72
1732.72
7,912.32
0.00
0.00
0.00
28,700.00
89.48
152.18
7,576.50
-7,821.16
1,779.38
8,010.12
0.00
0.00
0.00
28,800.00
89.48
152.18
7,577.41
-7,909.60
1,826.04
8,107.93
0.00
0.00
0.00
28,900.00
89.48
152.18
7,578.31
-7,998.05
1,872.70
8,205.74
0.00
0.00
0.00
29,000.00
89.48
152.18
7,579.22
-8,086.49
1,919.36
8,303.54
0.00
0.00
0.00
29,100.00
89.48
152.18
7,580.12
-8,174.93
1,966.02
8,401.35
0.00
0.00
0.00
29,200.00
89.48
152.18
7,581.03
-8,263.37
2,012.68
8,499.16
0.00
0.00
0.00
29,300.00
89.48
152.18
7,581.94
-8,351.81
2,059.34
8,596.96
0.00
0.00
0.00
29,400.00
89.48
152.18
7,582.84
-8,440.26
2,106.00
8,694.77
0.00
0.00
0.00
29,500.00
89.48
152.18
7,563.75
-8,528.70
2,152.66
8,792.58
0.00
0.00
0.00
29,600.00
89.48
152.18
7,584.66
-8,617.14
2,199.32
8,890.38
0.00
0.00
0.00
29,700.00
89.48
152.18
7,585.56
-8,705.58
2,245.98
8,988.19
0.00
0.00
0.00
29,800.00
69.48
152.16
7,586.47
-8,794.02
2,292.64
9,086.00
0.00
0.00
0.00
29,900.00
89.48
152.18
7,587.37
-8,882.47
2,339.30
9,183.80
0.00
0.00
0.00
30,000.00
89.46
152.18
7,588.28
-8,970.91
2,385.96
9,281.61
0.00
0.00
0.00
30,100.00
89.48
152.18
7,589.19
-9,059.35
2,432.62
9,379.42
0.00
0.00
0.00
30,200.00
89.48
152.18
7,590.09
-9,147.79
2,479.28
9,477.22
0.00
0.00
0.00
30,300.00
89.48
152.18
7,591.00
-9,236.23
2,525.94
9,575.03
0.00
0.00
0.00
30,400.00
89.48
152.18
7,591.90
-9,324.68
2,572.60
9,672.84
0.00
0.00
0.00
30,500.00
89.48
152.18
7,592.81
-9,413.12
2,619.26
9,770.64
0.00
0.00
0.00
30,600.00
89.48
152.18
7,593.72
-9,501.56
2,665.92
9,868.45
0.00
0.00
0.00
30,700.00
89.48
152.18
7,594.62
-9,590.00
2,712.56
9,966.26
0.00
0.00
0.00
30,708.50
89.48
152.18
7,594.70
-9,597.52
2,716.55
9,974.57
0.00
0.00
0.00
TD: 30708.5' MD, 7594.7' TVD
Design Targets
Target Name
-hiVmiss target Dip Angle
Dip Dir.
TVD +N/ -S
+E/ -W
Northing Easting
-Shape
V)
V)
(usft) (usft)
(usft)
(usft)
(usft)
Latitude
Longitude
CD5-98L1 TOt Heel 122
0.00
0.00
7,449.70
- plan hits target center
-Circle (radius 100.00)
CD5-981_1 T02 Toe 1221
0.00
0.00
7,594.70
- plan hits target center
- Circle (radius 100.00)
4/11/2019 9:11:41AM Page 7 COMPASS 5000.14 Build 85D
ConocoPhillips
Database:
OAKEDMPI
Company:
ConocoPhillips Alaska lnc_WNS
Project:
Western North Slope
Site:
CDs Alpine West Pad
Well:
Plan: CDS-98 (11 B)
Wellbore:
CD5-98L1
Design:
CD5-98L1 wp04
Casing Points
Measured
Depth
(usft)
159.80
2,296.67
13,821.00
30,708.50
Plan Annotations
Measured
Depth
(usft)
13,820.00
13,832.80
13,862.80
14,378.28
14,394.39
14,707.12
30,708.50
Vertical
Hole
Depth
Diameter
(usft)
(in)
159.80
20
2,189.70
10-3/4 x 13-1/2
7,449.69
7-5/8 x 11
7,594.70
4-1/2x6-1/2
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
ConocoPhillips
Standard Proposal Report
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (025)
Plan D25 Q 74.70usft (D25)
True
Minimum Curvature
Casing
Hole
Diameter
Diameter
Name (in)
(in)
20.000
48.000
10.750
13.500
7.625
11.000
4.500
6.500
Vertical
Local Coordinates
Depth
-N/-S
+EI -W
(usft)
(usft)
(usft)
Comment
7,449.48
5,251.39
-5,282.87
KOP: 15.9'/100' DLS, -25° TF, for 12.8'
7,452.92
5,242.01
-5,274.87
Hold for 30'
7,460.52
5,220.06
-5,255.87
Start 4.88'/100' OILS, 5.43° TF, for 515.48'
7,479.56
4,826.95
4.929.42
Hold for 16.11'
7,476.65
4,814.55
-4,919.54
Start 4.88°/100' OILS, 135' TF, for 312.73'
7,449.70
4,554.43
-4,749.74
Hold for 16001.38'
7,594.70
-9,597.52
2,716.55
TD: 30708.5' MD, 7594.7' TVD
41112019 9.11:41AM Page 8 COMPASS 5000.14 Build 85D
ConocoPhillips Alaska Inc_WNS
Western North Slope
CD5 Alpine West Pad
Plan: CD5-98 (118)
CD5-98LI
50103xxxxx00
CD5.981-1 wp04.1
ConocoPhillips
Clearance Summary
Anticollision Report
06 March, 2019
Tm. Cylinder NSurvey
orth Proximity scan on Current Data (North Reremnce)
Reterenca Deel9¢ CD5 Alpine.. Pad- Plan: CD5b0(11B)-CDS-901-1-CD5.90L1 salads
Datum HelghL Plan D35@14.14uaR(D35)
Scan Range: 1],.H.001.30.]0.... ue R. Measured Depth.
Scan Radlue Is 3,3.6.]1 -ft. CW ance Factor cutoff is Unlimited. Max Ellipse Sepa...n is Unlimited
Gial Scale Fahr P,Oh sl
Vemon: 5000.14 Build: RISE)
ScanT..i
Sran TYP.: "®
ConocoPhillips
ConocoPhillips
Anticollision Report for Plan: COS -98 (11B) - CD5-981.1 wp04.1
ColocoPhillips Alaska Inc _WNS
Western North Slope
V. C,11. a, North PmYmtty$.an cn Cement Survey Dila ploex Neremncel
2.8WA1
19.689.48
ReMenu Dpgn: red Alpine Weal Pad -flan: ODS46 N1B1-006-961.1-CD64BL1 np04
15,200,0
4,944 EIIIpss Sepandem
Sean Nana: 13,820AD to 30.708.60 ask Meadunb DepM.
22.58223
2,95038
Scan Radius N 3.266." Usk. CWe.- Facb1 CumR. Uni i.d. Max CIUPae Sapan km Is Unlimlmd
2,332.92
29.103.00
Mpaund Mlnlmum @M¢aaunl
Ellipse
alseeund CNannw Sumnury lease, 0.
an, Name DspM DNbnce DaP
sepantien
D.Mh Fxmr M.I.A. U ams n Wunlns
Omparlson ANU Name-WeIIWn Name -Desip (sank IwN (.am
hies
usk
COS Alpine West Pad
CD5-20-CD5-20-CD9.20
CD5-W-co5-20-CDS2D
CDS25-CD5-20L1-CD5-WL1
CD6 -CD5-20L1-CDS20L1
CDS22-CD5-22-CD5-22
CDS22-CD5-22-CD5-22
CDS22-CD5-21-CD5-22
CDS23-CD5-23-CD5.20
CD523-CDS-23-CDS23
CDS23-CD5-23-CDS23
CD5-25-CD5-25-CDS25
CD5.25-CD5-25-00S25
CDS25-CM-25LI CD525L1
CDS25-005-251-1-CD5-251-1
CDS25-CD5-251-1-CDS250
COS313-CD5313P81-CDS313PB1
005315- Coal -CD5415
CDS-315 - CM415 - CDS-31
CDB -31 5 - CD5d 15 - CD5.315
CDS315-CD5-315PB1-MS-315PB1
CD5315.CD5-315PB1-CD5-315PB1
CD5315-CD5-315PB1-CD5315PB1
Plan: CD5-26 (l1C)-CDS26 -CD5-26 arp05 (11A)
Nen: CD5-26 (11C)-CDS20L1-CD5-2611 wp3
Nan: CD5-9 (12C) -CD5-27-CD5-27wp02 W (12C)
Nan: CDS27 (12C). CDS27-CDS27wP0210 (12C)
Nan: CD5-9(12C)-CD5-27-CD547a 2e3(12C)
Plan: CDS28 (13C) -CDS25-CD -28 02 W (13C)
19,668.40
2.8WA1
19.689.48
2,299.44
15,200,0
4,944 EIIIpss Sepandem
Pau -
22.58223
2,95038
2!,56233
2,332.92
29.103.00
4.779 Clesnn eFant
Pass -
15.022.98
2,80720
15,022.98
2,323.99
10.300A0
5.120 C¢Mre Malano
Pass -
0,990A1
2.913.88
0,998.41
2,301.08
22,523.57
4.755 Clearance Faces
Pan -
18.167.89
2,611.02
18,157.89
?042.35
8.800.00
4591 Came DMnm
Pass -
16.091.86
2,813.02
18,001 Be
2,41.53
0.900.00
4.573 Planes SWamWn
Paas -
16,01223
2,619.50
10,012.23
2,045.08
8.900.57
4.567 Ceaance F.W'
Pass -
14,803.54
1,353.59
14,803.54
772.57
11,300.57
2.331 Caea Di n.
Pass -
M,720.00
1,355.35
14,720.03
"2.95
11.4W.W
2.327 E11W BapamWn
Pass -
14.592.82
1,380.98
14,692,2
780.55
11,857.57
2.326 Cleannu Fazbr
Pass
22,551.24
1,441.0
22.55124
557.95
7,9W.W
2.470 Elapses Sepa2Wn
Pa.
30,83229
1,519.35
30.83229
892.69
10,000.00
2.25 Clearance Faces
Pass
22,551.24
1,441.40
22,55134
857.85
7,957.57
2.470 CenOe DlMan.
Pass -
22,336.38
1.459.74
9,338.38
847.75
12.700.00
2.305 Btpse Sepanlbn
Pa36-
9.430.38
1,460,40
27.438.38
847.91
12800.00
2.384 Clearance Fack4
Pass -
30.656.67
2.925.42
30,&56.87
2,348.88
12500.00
8074 Cie.. Facbr
Pass -
28.310.57
1.7029
28,310.57
1,268.50
11,10D.W
3.405 Centre Delay
Paas
28,590.88
1.811.98
2,30.88
134220
11,557.57
3.100 ElliM Weston
Pa4a-
2,ne.15
1.840.09
2,7m.15
1,254.05
11,7W.W
3.142 Ckamnu Facbr
Pass.
28,670.29
1,32.77
20,570.29
1,353.42
11,300.00
3.09 CaMre DislenW
Pass
28,997.16
1,070.90
20,997.16
1,330.32
11,700.00
3.425 Ellipse Sepmakn
Pass -
29,4W.29
1,940.77
29,400.29
1,38259
12.200.00
3.324 Cleannu Feder
Pass -
30,825.80
423.82
3,625.98
20530
13,1W.0D
3.057 Cleennce Feeler
Pass -
3D,625.3
423.82
30,82598
M.20
13,157,0
3,9 Cleadan sftc
Pass -
28,30.10
1,23]0
28,058.10
740.15
11,557.00
2,349 Canam Dn.
Adze -
29,13.70
1,308.19
29,186.70
71624
11,9c0.W
2200 takes ftemsen
Rem -
n,35100
1,334.2
20.351.00
725.3
12,100.3
2.193 Cleannu Facbr
Paas -
26.145.3
2303.50
26,145.3
1}44.08
9,357.57
4.805 CenOe Eden.
Pass
3 Marth, W19 - 14:47 Pepe 201`6 COMPASS
Ill"
ConocoPhil I i ps
Coo6coPhillips Abske Inc _WNS
Western North Slope
Anticollision Report for Plan: CDS-98 (11B)-CD"8L1 wp04.1
Tnv. Cylinder NaM PmalmHy Scan on Cumnl Surv%Mla (Nom Rereranw)
Refnence DnlBn: CM Alpine Weal Pad - Plan: C06-98 "IBS -00648.1-CDiABL1
wp04
Scan Rame.: 13,820.00 b W,706.50 .11, Measured DIM.
Scan Radius 4 3,250.77 uaN. CWA.mm FA tp,.bNb UcIl.NI. Max Elllpe 8epamM,.la UnIMNN
Measured
Mlnlmum
@lA... mod
Ellipse
@M.aeund
claannu Summary BnMI
Sib Name
Dome
Dlabnce
Daen
SepaMun
Mo.
Factor Name.
Slan6on Wamirp
comparison SO None -WNIBen Name - Damn
IueN
Man)
(ueN
bah)
caR
Pion: 005-26(13C)-CD5-28- CDS20 M02 v3(13C)
26,500.06
2,231.03
28,500.06
1,718.90
9,000.00
4.339 Ellipse Sapam00n
Pass -
Plan :CD5.2B(IX)-CDS28-CD5-20 x,4020(13C)
27,014.97
2.355.41
9,414.97
1,7&5.4"
10.500.00
4.133 CIWRnce Factor
Pass-
PIan:CD 90(12B)-CDS80(120)-C05-90 M02W
13,054.53
1,377.91
9,054.53
1,157.70
17,100.00
8.257 Centre Distance
Pan-
PIen:CDi90(I2B)-WS90(12B)-CD5-90 M02
20.811.34
1.520.13
20,811.34
053.94
31.767.10
2.317 clearance Factor
Pass-
Plan:GD5.92-WA 92-CDS92 MOD
14.427.26
794.47
14,42736
47899
10,4000o
2.518 Ckarence Facbr
Pma-
Plan:CDS92-005-92-CD5-92x,405
13,850.62
SN24
13,85082
45581
10,000.00
3.768 EBilae Separation
Pass-
Ran: CDS93(IM -CDS93-CD5A3 x,4020,42.7)
14,451.52
1258.02
14,451.62
1,071.67
10,70080
0151 CNaIaIMR Factor
PaSs-
Pace CD5-93(12A)-CDS93-W5A3 M020(12A)
13,846.91
124214
13.046.91
1,166,79
10,800.D0
16,484 Comm Di9alar
Paas-
Pan:C05-94(13.7)-CDS94-CD5-94 np03 V3 (IM)
14,544.77
2.115.05
14.W.77
1,793.15
10,6W.00
0.570 Clea. F.mol
Paa-
PlanCflS (13A)-CDS94PH1-WS94PH1.01
14,W.77
2,115.D5
14,W.n
1,793.02
10,650.00
0.588 Cie.Fadm
Pa3a-
Pbn:CD5S(1(118)-CDS98-W5-0B(II (8"04.1
--
Preim: CDS29(14C)-CDS29-CD-29xp010(14C
20,099.95
24303-76
20,899.95
2,047811
7,100.00
9002 Centre Ubama
Pma-
Preim:CDS29(14C)-CD5-29-CDS29MDIv3(I4C
21,270.02
2,347.15
21,278.02
1,998.20
7,790.00
6.888 Elio.S,,oaon
Pd58-
Prato CDS29(14C).CD5-29-CDS2WVD10(14C
22097.16
2.726.84
22,097.16
2232.31
9,W0.00
5.514 Cl mance Faclor
Pd3s-
Preto : CDS95(1M)-C05-95-C06-95M01 a3 (14A
15,62"85
2,529.82
15.627.65
2195.78
9,300.00
7.574 Caere Damon
Pass.
pollen. CD595(I")-C05.95-W6-95MDI0(14A
15,179.30
2,559.77
15.179.38
2.136.13
9,900.00
8.342 EHHW Separation
Pasa-
Reim, CDS95(I")-CD5-95-CDS-95.ap01J (I4A
14,638.58
2,670,40
14.838.58
2,198.42
10,600.50
5.657 CkamnceFehr
Pass-
PRM.: CDS90(15A)-CD5A6-CD5-96 op020(9B
14,569.18
2,614.16
14,569.18
2.388.60
8180950
11.590 Centre Dsnrw
Pass.
P.l. CD&N(15A)-CDNQS-CDSWxp020(130
27,059.36
2.980.72
27.059.36
$355.9
25,838.82
4129 Ckmlce Factor
Pass-
Pre1m: CDS97(16A)-CDS97-CD&W xpOt 0(IDA
17,665.44
3,112.27
17,885.44
2.00388
7.700.00
9.530 CeMn Monts
Pass-
P.I.CDS7(16A)- COW. C05�97 M010(I6A
17.00831
3,145.82
17,DO2.31
2,82851
0.500.0D
9.914 EApw Sapamonn
Pab-
PRIm: WS97(18A)-WS97-W5-97 on0l0(16A
10856.30
3,257.48
18,256.30
2871.07
9,400.00
&430 Cllnnce Factor
Pass-
NIS CD5-24-CDS24-005-24MID
28,99137
2.774.98
28,98197
2177.82
11,400.00
4.047 Canoe Mstance
Pa. -
OOL89:505-24-CDS24-W5-24x,410
R,: C05-24 - (30S24 - W5-24 MID
29.3"095
2,780.47
29,34645
2,189.52
11,80D.00
4.551 EIIIpce Separdl.n
Pace -
RD, W5-24-CDS24-W534 MID
30.056.31
2,827]5
30,058.31
2,14956
12800.00
4,481 Clearer F.Mr
PaR-
R9:W5-24-C 24.(05-24
28,20054
2,799.76
20,280.84
2241.21
10,650.00
5.013 Came DionM2
PeR-
Rig C05-24-CD5-24-505.24
28.780.80
2,802A7
29,780.80
$184.32
12,300.00
4.534 Ellipse Seppmeen
Pon -
RPMS.24-CDS24-CD5.24
29.964.59
2.009.17
29,964.59
2187.14
12503.00
4.516 Cbnanc¢FaCbr
Paao-
OB ktamh. 2019 - 1441 Pa0a3p18 WMPASS
ConocoPhil lips
Anticollision Report for Plan: CDS-98 (1113) - C135-981-1 wp04.1
Survev tool nrooram
F.
To
BurveyNhn
Survey Ton!
heal
lush
40.80
1.900.00
GYDGUss
1,900.00
2,290.00
R&M-IFRAK-CP -SC
2,280.00
13,820.00
MN9sIFRAK-CA -SC
13,020.00
14,550.00
Cn5-981-1 w1N14
INC.TREND
14,350.00
15,850.00
CD5-981.1 wp34
MWD
14350.00
30,708.50
CM -98L1 wp54
MWDNFRAI( SC
FJ800eetmr semis ere mfrelaled awss eervey iml aeon I mels.
Calculated eliPses inmi,rete Wdsm a m.
Sep iet'wn is the acwal dislanw besween elllpsdlds.
Distance Beeemn Me s is Ne YrelghtiM d sMsm aseesen welfare mntma.
CMas4. Factor=Diesar Between Pmlles I(DisUM. Between Rofles-DOW Separsten).
Nt slam coordinates were miNu%M tzsng Me Minimum Curvaiem meMW.
Conocolehillips Alaska Inc WNS
Western North Slope
0 Memh, 2019 14,47 Page 4 06 Comi
10:53, MuM W 2019
CD5-98L1 wp04.1
Ladder View
300
c
0
j
0200
W
of
m
d
V
O
m
X100
—
m
V
0
15000 17500 20000 22500 25000 27500 30000
INeasured Eeoth
ELFbEh FFCCFPA
CPEINC EETPILE
th Fran Eeoth To Eurvev/Flan Tool T
E RE Nan
40.80 1900.00 CC5-98 (11E -P) Ao04.1 CYE -CC -EE
7449.69 13821.00 7-5/8 x 11
1900.00 2290.00 CE5-98 (11E -P) Ao04.1 AV E+I1FF-Pk-CP2-EC
7594.70 3070E.50 4-1/2x6-1/2
2290.0013820.00 C15-98 (11E -P) vo04.1 AV E+IFF-PH-CP2-EC
13820.0014350.00 CC5-98L1 %A o04 (CE5-98L1) INC+TFE(`E
14350.0015850.00 C C 5-98L 1 to o04 (C E 5-98L1) KV E
14350.00 30708.50 CC5-98L1 Ho04 (CE5-98L1) NV E+IFF-PN-CP2-EC
60
__....— _......
— —...I
0
Z6
`m
d
w
m
c30
--
—
v
o
m
d
v
0
14000 14250 14500 14750 15000
Fartlal INeasured Eeoth
14:51, March 06 2019
CD5-98L1 wp04.1
TC
View
ELFVEO FFCCFPE
EEC TIC I, CETP ILE
Fran To Tcal
AC Inc Pzi TVC
Clea
TFace
Target
Annotation
40.80 1900.00 CYC-CC'E13820.00
73.49 140.00 7449.4E
0.00
0.00
VC F: 15.91100' C LE. -25°T F. for
12E'
1900.00 2290.00 EVC+IFF-PN-CP2-EC
13832.80 75.34 139.11 7452.92
15.90
-25.00
Fad for 30'
2290.00 13820.00 EV CLIFF-PV-CP2-EC
13862.80 75.34 139.11 7460.82
0.00
0.00
Stan 4.88°/100'ILE. 5.43 -TF. far
515.48'
13820.0014350.00 IPC.TF EPC
14350.0015850.00 AVC
14378.28 100.39 141.4E 7479.55
14394.39 100.39 141.46 7476.65
4.88
0.00
5.43
0.00
Fcl0 for 16.11'
Etart 4.881100 CLE. 135 -TF. for
31273'
14350.00 30708.50 EV 1.IFF-PI,-CP2-EC
14707.12 89.48 1522.18 7449.70
4.88
135.00
C15-9811 1. Fee1122418JWow
for16001.38'
30708.50 89.48 152.18 7594.70
0.00
0.00
CC5-90112.Tce 122418JFTE:20708.5'EE.7594.7'16C
CPEPC CETPILE
Tbl AC Pana
7449.69 13821.00 7-5/8 x 11
7594.70 30708.50 4-1/2 x 6-1/22
0
180
D5-98 (11B -A) wp04.
30
50
0 -
- 13820
0 0
13820 -
14000
12
14000 -
14190
14190 -
14370
300
fi0
14370 -
14550
14550 -
14740
14740
14920
9 6
14920
15100
15100 -
15750
15750
16400
16400 -
17050
270
90
17050 -
17700
17700 -
18350
18350 -
19000
19000 -
19650
19650
20300
0300 -
21600
90
1600 -
22900
240
12C
2900
24200
12
4200 -
25500
5500 -
26810
6810
28110
1
8110-29410
210
150
9410
30709
180
1L:SfMOd1 �)VB
CD5-98L1
wp04.1
13820.00
To 16000.00
AC Flipbook
ELFbEV FFCC FAN
ossa (118-a) 1nrp04.
0
0
13820 -14000
13820
oth Fron Cloth To Tool
40.80 1900.00 C1LCC �9
1900.00 2290.00 hV CeIFF-Pk-CP
14000 -14190
2290.00 13820.01) h Ci FF -Pk -CP
90
13820.00 14350.00 IPC.a FEPC
14350.00 15850.00 KV 1
330
is 0
30
14190 -14370
14350.00 30708.50 PV C+IFF-Pk-CP
-
14370
14550
as
60
i a
14550 -
14740 -
14740
14920
CP81PC CEIP IL£
TbC PC Pane
7549.69 13821.00 11
300
60
14920 -15100
1/2 x -
7594.70 30708.50 4.1/2 x 6-1/2
2
15100 -
15750
15750
16400
N Pzi TFace
13832.80 140.00 5.00
16400 -17050
1383^e.80 139.11 -25.00
1 ga
13862.80 139.11 0.00
17050 -
17700
14378.28 141.46 5.43
90
14394.39 141.46 0.00
270
17700
-18350
14707.12 152.18 135.00
30708.50 152.18 0.00
18350
- 19000
19000
- 19650
3
19650
20300
20300
- 21600
240
120
21600
- 22900
22900
- 24200
24200
- 25500
25500
- 26810
212
150
90
26810
28110
180
28110
- 29410
29410
- 30709
fa -a W."
CD5-98L1
wp04.1
16000.00 To
30709.00
AC
Flipbook
ELF%EV FFCCFPK
D5.98 (118-A) Wp04.
0 13820
Fron Ceoth 70 Tool
eth
40.80 1900.00 CVL -CC 5
0
13820-14000
1900.00 2290.00 KV C4IFF-PkCA;
2290.0013820.00 KV 14IFF-WCP
90
14000 -14190
13820.0014350.00 IP C ITF E P C
1730
330
30
14350.00 15850.00 KV C
14190 -14370
14350.00 30708.50 KV [.IFF -Pk -CP
14370 - 14550
60
14550-14740
14740 -14920
CP511,C CETPILS
Tec n C None
7449.69 13821.00 7-5/8 x 11
7594.70 30708.50 4-1/2 x6-1/2
300
6Q
14920 -15100
15100 - 15750
15750 16400
A C Pzi TFace
138220.00 140.00 0.00
13832.80 139.11 -25.00
16400 -17050
13862.80 139.11 0.00
14378.228 141.46 5.43
17050 -17700
14394.39 141.46 0.00
90
270
14707.12 152.18 135.00
17700 -18350
30708.50 152.18 0.00
I
18350 19000
19000 19650
3
19650 20300
20300 - 21600
240
120
21600 22900
60
22900 - 24200
24200 - 25500
25500 26810
210
150
90
26810 28110
180
28110 29410
29410 - 30709
CD5-98L1 wPO4.1 16000.00 To 30709.00 1 Spider
E astina !9500 usftrin)
ConocoPhillips Alaska
Inc WNS
Western North Slope
C135 Alpine West Pad
Plan: CDS-98 (11B)
50103xxxxx00
CD5-981-1
Plan: CD5-98L1 wp04
Error Ellipse
Survey Report
11 April, 2019
Company:
ConocoPhillips Alaska lnc_WNS
Project:
Western North Slope
Site:
CDs Alpine West Pad
Well:
Plan: CDS-98 (11 B)
Wellbore:
CD5-98L1
Design:
CD5-981_1 wp04
ConocoPhillips
Error Ellipse Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Well PlanCD5-98 (11B) -Slot 98
Plan D25 @ 74.70usft (025)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
2.00 sigma
OAKEDMPI
Project
Western North Slope, North Slope Alaska, United States
Map System:
System Datum:
Mean Sea Level
Geo Datum:
(usft)
(usft) Survey (Wellbore)
Using Well Reference Point
Map Zone:
40.80
1,900.00 CDS-98(11 B -A) wp04.1 (CD5-98)
Using geodetic scale factor
Gyrodata gyro single shots
1,900.00
2,290.00 CD5-98(11 B-A)Wp04.1(CD5-98)
MWD+IFR-AK-CAZ-SC
Site
CD5 Alpine West Pad
13,820.00 CD5-98(11 B -A) wp04.1 (CD5-98)
MWD+IFR-AK-CAZ-SC
Site Position:
Northing:
14,350.00 CD5-981_1 wp04(CD5-98L1)
Latitude:
From:
Map Easting:
15,850.00 CD5-981_1 wp04(CD5-98L1)
Longitude:
Position Uncertainty:
0.00 usft Slot Radius:
13.200
in Grid Convergence: -1.15 °
MWD+IFRAKCAZSCC
Well.
Plan: CD5-98 (118) - Slot 98
Well Position
+NIS Northing:
Latitude:
+EI -W Easting:
Longitude:
Position Uncertainty
0.00 usft Wellhead Elevation:
0.00 usft Ground Level: 33.90 usft
Wellbore
CD5-981_1
Magnetics
Model Name Sample Date
Declination
Dip Angle Field Strength
1°)
19 (nT)
BGGM2018 7/1/2019
16.07 80.72 57,373
Design
C135-981_1 wp04
Audit Notes:
Version:
Phase: PLAN
Tie On Depth: 13,820.00
Vertical Section:
Depth From (TVD)
+N1 -S
+EI -W Direction
(usft)
(usft)
(usft) (°I
40.80
O.Do
0.00 164.20
Survey Tool Program
Date 4/11/2019
From
To
(usft)
(usft) Survey (Wellbore)
Tool Name
Description
40.80
1,900.00 CDS-98(11 B -A) wp04.1 (CD5-98)
GYD-GCSS
Gyrodata gyro single shots
1,900.00
2,290.00 CD5-98(11 B-A)Wp04.1(CD5-98)
MWD+IFR-AK-CAZ-SC
MWD+IFRAKCAZSCC
2,290.00
13,820.00 CD5-98(11 B -A) wp04.1 (CD5-98)
MWD+IFR-AK-CAZ-SC
MWD+IFRAKCAZSCC
13,820.00
14,350.00 CD5-981_1 wp04(CD5-98L1)
INC+TREND
Inclinometer +known azi trend
14,350.00
15,850.00 CD5-981_1 wp04(CD5-98L1)
MWD
MWD -Standard
14,350.00
30,708.50 CD5-98L1 wp04(CD5-9BL1)
MWD+IFR-AK-CAZ-SC
MWD+IFRAKCAZSCC
4/112019 9:23:03AM Page 2 COMPASS 5000.14 Build 65D
Company:
ConocoPhillips Alaska lnc_WNS
Project:
Western North Slope
Site:
CDS Alpine West Pad
Well:
Plan: CD5-98 (11 B)
Wellbore:
CD5-98L1
Design:
CD5-981.7 wp04
ConocoPhillips
Error Ellipse Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Plan Survey Tool Program Date 4/11/2019
Depth From Depth To
(usft) (usft) Survey (Wellbore) Tool Name Remarks
1 40.80 1,900.00 CD5-98 (11 B -A) wp04.1 (CD5-98 GYD-GC-SS
Gyrodata gyro single shots
2 1,900.00 2,290.00 CDS-98 (11 B-A)wp04.1(CD5-98 MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
3 2,290.00 13,820.00 CD5-98 (11B -A) wp04.1 (CD5-98 MWD-IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
4 13,820.00 14,350.00 CD5-981_1 wPO4(CDS-98L1) INC+TREND
Inclinometer + known azi trem
5 14,350.00 15,850.00 CD5-981_1 wp04 (CD5-98L7) MWD
MWD - Standard
6 14,350.00 30,708.50 CD5-98L1 wp04 (CD5-981_1) MWD+IFR-AK-CAZ-SC
MWD+IFR AK CAZ SCC
Position uncertainty and bias at survey station
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (D25)
Plan D25 Qa 74.70usft (D25)
True
Minimum Curvature
2.00 sigma
OAKEDMPI
Measured
Inclioafion
Az1muM
vertical
Ri9hside
"..I
v mcal
Ma9nnude
somiina}or
semi -minor
Dep*
DeP*
Ener
Blas
Error
Bias
Error
Bias
of Bias
Error
Ener
Azimu* Tool
fusm
1°I
PI
(..ft)
(..ft)
(o,m
(usn)
(ush)
(uaal
(usm
(usm
(.oft)
(..n)
(,I
13,82000
73.49
Mel)
7M948
27.09
-9.15
9844
0.85
30.15
8.32
936
9857
17.29
13669
INC+TREND(1. 4)
13,82100
7364
139.93
7.49.77
27.09
-9.15
9844
0.85
30.15
8.32
938
98.57
17.29
13669
INC -TREND (1, 4)
13.83280
7534
139.11
7,452.92
2]38
+9.12
99.23
0.01
30.15
833
936
99.31
1]31
136.74
INC+TREND(1, 41
13,08280
75.34
139.11
7,460.52
2747
-9.12
10522
0.81
30.23
8.34
9.35
105.20
17.38
137.02
INC+TREND(1, 4)
13.900.00
77.15
139,29
7.469.36
28.05
.9.05
118.52
082
sew
835
9.34
118.58
17.50
137.50
INC+TREND(1, 4)
14,000.00
82,01
13975
7,487.44
30.87
5.84
174.30
085
3218
0.37
9.30
17433
17.07
13855
INC+TREND(1,4)
14,100.00
88.87
140.20
7.497.13
39.03
4.58
243.77
0.88
3934
8.38
926
24381
10.15
13e14
INC+TREND(1. 4)
14,20000
91.73
140.65
7.98.36
4192
-8.27
317.10
0.91
41.79
8.39
922
317.16
10.39
139.53
INC+TREND(1, 4)
14.300.00
96.59
141.10
7,491.11
5806
-7.91
39370
0.94
55.02
838
9.18
39379
1882
139.04
INCrTREND(1. 4)
14,378.28
100.39
141.46
7,479.55
56.39
-7.59
423.04
1.14
56.34
8.37
9.17
423.19
1875
139.94
MWD(1, 5)
14,394.39
100.39
141.48
7,476.65
5689
9.58
42300
122
56.35
8.37
9.18
423.15
18.76
13994
Mello (1. 5)
14,400.00
10020
141.65
7,05.85
58.41
-7.61
42295
125
56.35
0.37
9.10
423.14
10.76
139.94
mm (1, 5)
14,500.00
98.73
145.12
7.460.93
5676
6.90
421.19
1.91
5636
8.38
sm
422.91
1081
13994
um (1. 5)
14,80000
9324
148.55
7,452.24
5870
-0.16
417.96
2.54
56.37
8.35
929
422.71
10.90
13994
MwD(1. 5)
14,70000
8913
151.91
7,449.65
58.38
-836
413.32
3.13
58.40
835
938
422.54
19.04
139.94
M (1, 5)
14,707.12
89.48
152.18
7,44970
58.38
4.37
41293
3.17
56.41
8.35
9.39
422.52
19.05
139.94
M (1, 5)
14,800.00
89.48
152.18
7.50.54
58.40
4.37
412.79
355
56.44
885
849
422.38
1922.
139.94
M (1, 5)
14,900.00
8948
152.18
7,451.45
56.45
5.37
412.65
3.94
58.49
8.35
9.62
42223
19.41
13994
MM (1, 5)
15,000.00
N48
152.18
7,452.35
5650
-837
412.53
474
5655
835
9.T7
422.10
19.62
13994
MWD(1, 5)
15,10000
89.40
152.18
7,453.28
56.57
-0.37
412.43
674
5662
8.35
9.92
422.00
1986
139.95
M (1, 5)
15200.00
89.48
152.18
7,454.17
58.65
4.37
412.36
5.14
56.69
8.35
10.10
421.92
20.11
139.95
MWD(1, 5)
151300.00
8948
15218
7.455.07
56.73
4.37
41231
5.54
5878
8.35
1020
421.86
2038
139.98
MWD(1, 5)
15.00.0
89.48
152.16
7.55.98
58.83
-8.37
412.29
5.94
56.87
8.35
10.40
42183
2067
139.97
MWD(1, 5)
15.500.00
09.48
152.10
7,456.69
W93
-0.37
41229
8.34
$8.98
8.36
10.70
42181
20.88
13997
MWD(1, 5)
15,600.00
09.40
152.18
7,457.79
57.05
-0.37
412.32
8.74
57.09
am
1092
421.82
21.31
13998
mm (1, 5)
15,70000
8948
452.18
7,458.70
57.17
437
41237
7.14
57.21
8.36
11.15
421.86
21.65
140.00
MWD(1, 5)
15.800.00
89.48
152.18
7,459.60
57.30
4.37
412.44
]54
57,35
8.36
11.40
421.91
22.00
14001
MVID(1. 5)
151900.00
8948
15218
7,16051
56.57
4.38
412.86
159
56.62
8.36
871
422.45
1971
139.94 MWD+IFR-AA-CASC(2,5)
411112019 9:23:03AM Page 3 COMPASS 5000.14 Build 85D
Company:
ConocoPhillips Alaska lnc WNS
Project:
Western North Slope
Site:
CDS Alpine West Ped
Well:
Plan: CDS-98 (11B)
Wellbore:
CD5-9811
Design:
CD5-981-1 wp04
Position uncertainty and blas at survey station
ConocoPhillips
Error Ellipse Report
Local Coordinate Reference:
ND Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (D25)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
2.00 sigma
OAKEDMPI
Mea4urW
Incllnffien
"..0,
Var6cal
High.lde
Latent
Ve"ical
Magnitude
Semi -Mor
Samiminor
Dep%
nep0i
Error
Bias
Error
8ns
Error
Bias
of Bias
Error
Ener
gzimuN T.W
tura)
n
f)
(--ft)
(uan)
(usn)
(--ft)
(usn)
(ural
(usn)
(usn)
(u.e)
(usn)
r)
15,000.00
8948
152.18
7,461.42
56.61
-838
412.83
1.59
5666
836
869
422A2
1980.
139.94 MADaIFR AK CA SC(25)
16,100.00
89.48
152.18
7,462.32
56.65
-0.38
41280
1.59
%.69
835
867
422.39
19.89
13994 MAD IFR AK -CA -SC (2 5)
16,200.00
89.48
152.18
7.,163.23
WAB
4.38
412.78
1.59
56.73
8.36
8.65
422.37
19.99
139.94 MWUMFR-AK-CA SC (2, 5)
16,30000
8948
152.18
7,464.13
56.73
8.38
412]]
159
5878
8.36
864
422.34
MD8
13990 MWD+IFR-AK- A -SC (2, 5)
16,40000
8948
152.18
7,06504
58.78
8.38
412.75
1.59
5682
8.36
862
42233
20.18
139.95 MWD+IFR-AK-CAZ-SC(2, 5)
16,500.00
89.40
152.18
7,46595
56.03
-838
412.74
1.59
%.87
837
8.61
422.31
2028
13995 MM+IFR-AK-CAZ-SC(2, 5)
16,80000
8948
152.18
],086.85
56.88
-8.38
41273
1.59
56.92
8.37
859
422.30
20.39
139.95 MAD+IFR-AK-CAZ-SC(2, 5)
18,700.W
89.48
152.18
7,467.76
WA3
438
412.73
1.59
56.97
6.37
058
422.29
20.50
139.95 MWD+IFR-AK-CA -SC (2. 5)
1080000
89.48
152.18
7,468.67
5898
8.38
412.72
159
$7,03
8.37
857
42228
Man
139.% IAM+IFR-AK-CAZ-SC(2. 5)
16,900.00
8908
152.18
7.469.57
5704
4.38
412.72
1.59
5].08
837
8.56
422.28
2072
139.95 M IFR-AK-CAZ-SC(2, 5)
17,000.00
8948
152.18
7,47048
57.10
-8.38
41273
1.59
57.14
8.37
8.55
422.28
20.83
139% MWD+IFR-AK-CAZSC(2, 5),
17.100.00
89.48
152.18
7.471.30
57.16
-838
41274
1.59
57,20
8.37
8.55
422.28
2095.
139.% MADNFR-AK-CAZSC(2, 6)
17,200.00
89.48
152.18
7.472.29
57,22
3.38
412.75
159
5727
8.37
854
422.29
21.07
139.97 MAD+IFR-AK-CA -8C(2. 5)
17.30000
8948
152.18
7,473.20
S]29
8.38
412.76
1.59
5]33
8.37
053
422.30
21.19
139.97 MWD+IFR-AK-C -SC (2. 5)
17.40000
89.48
152.18
7,47410
57.35
4.38
412.78
1.59
57.00
837
8.53
422.31
2131
13997 MPMHFR-AK-CAZSC(2, 5)
17,50000
89.48
152.18
7.475.01
57,42
-8.38
412.80
1.59
57,47
837
8.53
42232
21.43
139.98 MWD+IFR-AK-CAZ-SC(2, 5)
17,60000
09.40
152.18
7.475.81
57.49
-8.38
41282
1.59
57.54
8.38
8.53
422.34
21.56
13995 MWD+IFR.AK-CAZSC(2, 5)
17,700.00
89.48
152.18
7.476.82
57.57
-8.38
41285
1.59
57.61
8.38
8.53
422.38
2160
139.93 MAD+IFR-AK-CAZ-SC(2, 5)
17,800.00
89.48
152.18
7,477.73
57.64
4.30
412.88
159
57.69
038
8.53
422.38
21.82
139.99 MWD+1FR-AK-CAZ-SC (2, 5)
17,900.00
89.48
152.18
7,478.63
57]2
8.38
412.91
159
57,77
8.38
8.53
422.41
21.96
140.00 MAD+IFR-AK-CA -W (2. 5)
18,00000
8948
152.18
7,479,54
57.80
-8.38
41295
1.59
57.85
8.38
8.53
422.44
22.09
14000 MM+IFR-AK-C/ -SC (2. 5)
10,100.00
8948
152.18
7,480.45
57.89
-838
41299
1.59
57.83
8.38
8.54
42 R
22.23
140.01 MWD+IFR-AK-CA -So(2. 5)
18,200.00
89.48
152.18
7,481.35
57.97
-8.38
41303
159
50.01
8.30
0.54
422.51
22.37
14001 MWD+1FR.M.0 Z-SC(2,5)
18,300.00
8948
152.18
7.482.26
58.08
538
413.08
1.59
58.10
an
055
422.55
22.51
140.02 MAD+IFR-AK-CAZ-SC(2, 5)
18,00000
8948
152.18
7.483.18
58.14
8.38
413.13
1.59
58.19
8.38
B%
422.59
22.65
14002 MWD+IFR-N(-CA2-SC(2, 5)
18,50000
8948
152.18
7.480.07
58.24
8.38
413.18
1.59
5838
8.38
8.57
42283
22.79
140.03 MAD+IFR-AK-CA-SC(2, 5)
18,60000
89.48
152.18
7.484.98
58.33
4.38
41324
1.59
5887
838
8.58
422.68
2294
14003 MWDHFR-AK-CA-ac(2, 5)
10.700.00
0948
152.18
7.485.88
50.42
-838
41329
1.59
5847
8.39
8.59
422,73
23.09
14004 MWD+IFR-AK-CAZ-SC(2,5)
10800.00
8948
152.18
7,486.79
5852
5.30
413.36
159
58.%
8.39
8.60
422.78
23.24
14004 MM+IFR-AK-CAZ-SC(2, 5)
18.900.00
8948
152.18
7,487.69
58,62
4.30
413.42
159
%.88
8.39
8.62
422.84
2339
140.05 MAD+IFR-AK-CAZ-SC(2, 5)
19,00000
8948
152.18
7.48880
58.72
8.38
41349
159
%,76
839
863
422.90
23.54
14000 MAD+IFR-N(-CAZ-SC(2, 5)
19,10000
8948
152.18
7,489.51
5882
8.38
413.%
1.59
58.87
839
865
422%
23.69
140.06MWD+IFR-AK-CA.SC(2. 5)
19,200.00
8848
152.18
7,40.41
58.93
-838
413.64
1.59
58.97
8.39
8.67
423.03
23.85
140.07 MAD+IFR-AK-CAZ-$C(2. 5)
19.300.0
89.48
152.18
7,491.32
59.03
-8.38
41371
1.59
59.08
8.39
069
423.10
24.00
14008 MWD+IFR-AK-CAZSC(2, 5)
19,400.00
89.48
152.18
7,49223
59.14
-8.30
41380
159
59.19
8.39
071
423.17
24.16
140.= MWO+IFR-AK-CAZSC(2, 5)
19,50000
8948
152.18
7.493.13
5925
830
413.88
159
59.30
8.39
073
42324
2432
140.09 MWD+IFR-AR-CAZ-SC(2, 5)
19,800.00
8948
152.18
7.49404
59.37
4.38
413.87
1.59
59.41
8.39
875
423.32
24.48
140.10 MAD+IFR-AK-0A -SC (2. 5)
19,700.00
8948
152.18
7.494.94
59.40
4.38
414.06
1.59
5952
8.39
8.77
423,40
2464
140.11 MAD+1FR-AK-CA-SC(2, 5)
19,800,=
09.40
152.18
7,4%.85
5060
-8.38
414.15
1.59
5964
800
880
42348
24.81
140.11 MWD+1FR-AK-CA-W(2,5)
19.900.00
8948
152.18
7.496.76
5972
-8.38
414.25
1.59
5976
840
8.82
423.57
24.97
140.12 MWD+IFR-AK-CAZ-SC(2, 5)
20000.00
8948
152.18
],49].66
5984
3.30
414.35
159
59.88
B.40
885
423.66
25.14
140.13 MWD+IFR-AK-CAZ-SC(2,5)
20,100.00
8948
152.18
7.498.57
59.96
038
414.45
1.59
00.00
8.40
8.88
423.75
25,30
140.14 MW +IFR-AK-CAZ-SC(2, 5)
20,200.00
8948
152.18
7,49948
60.08
-8.38
414.56
159
60.13
8.40
891
42384
25.47
140.15 MAD+117R-AK-CAZSC(2.5)
20,300.00
8908
152.18
7,500.38
60.21
-8.38
41467
1.59
60,25
840
6.94
423.94
2504
140.16 MWD+IFR-AK-CA-SC(2, 5)
20.400.00
89.48
152.18
7,501.29
60.34
-8,38
414.78
1.59
60.38
8.40
8.97
424.04
25.81
140.16 MAD+1FR-AK-CAZ-SC(2.5)
20500.00
89,48
152.18
7,502.19
60.47
-038
414,90
1.59
60.51
840
900
424.15
25.98
140.17 WMOFR-AK-CAZSC(2. 5)
20,600.00
89.48
152.18
7,933.10
60.80
-8.38
015.02
1.59
60.64
8.40
903
42425
26.15
140.18 MWD+IFR-AK-CAZSC(2,5)
20,700.00
89.48
152.18
7,50401
60.73
4.38
415.14
1.59
60.77
840
9.07
424.36
26.32
140.19 MWD+IFR-AR-0AZ-SC(2.5)
20,000.00
8948
152.18
7,504.91
60.07
4.38
415.26
1.59
6091
840
9.10
424A8
26.50
14020 MAD+IFR-AK-CA-SC(2, 5)
20930.00
09.48
152.18
7,505.82
61,01
-8.38
415.39
1.59
61.05
8.41
9.14
424.59
26.67
14021 MAD+IFR-AI(-C -W(2, 5)
21,000.00
8948
152.18
7.5%.72
61.14
-8.38
415.52
1.59
61.19
841
9.18
424,71
26,85
140.22 MM+IFR-AK-CAZ-SC (2,5)
21,100.00
09.48
152.18
7,507.63
61.29
4.30
415.66
1.59
61.33
841
921
424.83
27.02
140.23 MWD+1FR-AK-CAZ-SC(2, 5)
21200=
8948
152.18
7,50854
61.43
8.38
415.80
159
61.47
841
925
424.96
27.20
140.24 MP IFR-AK-CAZ-SC(2, 5)
21,300.00
8948
152.18
7,50944
61.57
S38
415.94
1.59
61.61
8.41
929
425,=
27.38
14025 MWD+IFR-AK-CA-SC(2, 5)
4/112019 9.23:03AM Page 4 COMPASS 5000.14 Build 85D
Company:
ConocoPhillips Alaska lnc_WNS
Project:
Western North Slope
Site:
CDs Alpine West Pad
Well:
Plan: CD5-98 (11 B)
Wellbore:
CD5-981.1
Design:
CD5-981-1 wp04
Position uncertainty and bias at survey station
ConocoPhillips
Error Ellipse Report
Local Coordinate Reference:
TVD Reference:
MO Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Well Plan: CDS-98 (11 B) - Slot 98
Plan D25 Q 74.70usft (D25)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
2.00 sigma
OAKEDMPI
Measured
1.01na4on
R Iiauv,
veiricm
ul9halde
Lateral
varticel
Mag.JWde
samlmajer
s¢mimmor
Depth
Wan,
Error
Bias
Error
Blas
Error
Bias
ad Bias
Error
Error
Aalmuth Tool
(usft)
P)
C)
Juan)
(.aft)
(usft)
(ush)
(usft)
(use)
(usft)
luet4
luaft)
(--ft)
11)
21.400.00
8948
152.18
7,510.35
61.72
-8.38
41608
1.59
6176
8.41
933
42522
2]56
14028 MWD+IFR-AK-CAZ-SC(2. 5)
21,500.00
89.48
152.18
7,511.26
61,87
-0.38
41623
1.59
6191
841
9.38
42535
27.74
14027 MWD+IFR-AK-CAZ-SC(2, 5)
21,60000
89.48
152.18
7,512.16
62.02
-838
416.30
169
62.06
841
942
42549
27.92
140.28 MWD+IFR-AK-CAZ$C(2, 5)
21,700.00
89.48
152.18
7,513.07
62.17
4.38
41853
159
62.21
8,41
9.46
42563
28.10
140.29 MW IFR-AK.CAZ-SC(2. 5)
21,800.00
8948
152.10
7,513.97
6232
5.38
416.69
1.59
6236
8.41
9.51
425.77
2828
140.30 MWD+IFR-AK-CAZ-SC(2, 5)
21,90000
8948
152.18
7,514.88
6247
-0.38
416.85
1.59
6251
841
955
42591
2846
140,31 MWD+1FR-AK-CAZ-W(2, 5)
2200000
8948
152.18
],515.]9
6263
538
417.01
159
62.67
842
960
426.06
28.64
140.33. MM+IFR-AK-0P.SC(2, 5)
22,100.00
89.40
152.18
7,51669
8279
5.30
417.18
1.59
62.83
8.42
965
426.21
20.83
140.34 MM.IFR-AI(-CA -SC (2, 5)
22200.00
8948
152.18
7,517,60
62.95
-8.38
417.35
1.59
62.99
8.42
9.70
426.37
2001.
140.35 MW WR-AK-CAZ-SC(2, 5)
22.300.00
8948
152.18
7,518.50
63.11
-0.38
417.52
1.59
63.15
8.42
975
426.52
29.20
140.38 MW0+1FR-AK-CAZ-SC(2, 5)
2260000
89.48
152.18
7,51941
63.27
-8.30
417.69
1.59
6331
8.42
9.80
42888
29.38
140.37 MWD+1FR-AK-CAZ-SC(2. 5)
22,500.00
0940
152.18
7,52032
6344
5.30
41187
159
6348
8.42
985
426.85
29.57
14038 MWD+IFR-AR-C -SC (2, 5)
22,800.00
89.48
152.18
],52122
6360
5.38
41805
159
63.64
842
9.90
427.01
29.75
14040 MWD+IFR-AK-,WSC(2, 5)
22.700.00
8948
152.18
7,522.13
63.77
-838
418.24
1.59
83.81
842
995
427.18
29.94
14041 MWD+IFR-AK-CAZ-SC(2, 5)
2200000
8948
152.18
7,523.04
63.94
538
418.42
159
6398
842
10.00
427.35
30.13
140.42 MWD+IFR-AK-CA2-6C(2, 5)
22.90000
8948
152.18
7,52394
64.11
530
418.62
159
64.15
842
Mrs
427.53
30.31
14043 MWD+IFR-AK-CAZ-SC(2, 5)
23,000,00
8940
152.18
1.524.85
8428
5.38
418.81
1.59
64.32
843
10.11
427.71
30.50
14045 MWD+IFR-AK-CA-6C(2, 5)
23,100.00
8948
152.18
7,525.75
64.46
-8.38
419.01
159
64.49
8.43
1017
427.89
3069
140.46 MWD+IFR-AK-CAZ-SC(2,5)
23$00.00
89.48
152.18
7,526.66
64.63
-838
419.21
1.59
64.67
843
10.23
42807
30.88
14047 MWD+IFR-AK-CAZ-SC(2, 5)
23,30000
89.46
152.18
7,527.57
64.81
-6,38
419.41
159
6485
0.43
1028
428.26
31.07
14049 MWD+1FR-M-CAZ-SC(2, 5)
23.40000
8940
152.18
7,528.47
64.99
430
419.61
159
65.02
6.43
1034
42845
31.26
140.50 MWD+IFR-AK-0A2-SC(2, 5)
23,500.00
09.48
152.18
7,529.38
65.17
5.38
41982
1.59
65.20
8,43
1040
428.64
31.45
14051 MWD+IFR-AK-CA-SC(2,5)
23,800.00
8948
152.18
7,630.28
65.35
-8.38
420.04
1.59
65.39
8.43
1046
428.83
31.64
14053 MWDMFR-AK-C -SC (2+ 5)
23,700.00
89AS
152.18
7,531.19
65.53
-038
420.25
1.59
6557
843
10.52
429.03
31.83
140.54 MM+IFR-AK-CAZ-SC(2, 5)
23,800.00
8940
152.18
7,532.10
6531
4.38
420.47
1.59
65.75
843
lam
42923
32.02
140.56 MM+IFR-AK-CP -SC (2. 5)
23,900.00
09.48
152.18
7,533.00
6590
5.38
42069
1.59
65.94
8.43
10.64
429.43
32.21
140.57 MWD+IFR-AK-CAZ-SC(2, 5)
24,000.00
8948
152.18
7,533.91
66.09
-8.38
420.91
1.59
66.12
B43
10.70
429.64
32.40
140.50 MWD+IFR-AK-CAZSC (2,5)
24,100.00
8948
152.18
7,534.02
56.27
-838
421,14
1.59
66.31
8.44
10.76
42985
32.59
14060 MM+)FR-AK-CAZ-SC(2, 5)
2420000
8948
152.18
7,535.72
6&46
-6.38
421.37
159
66.50
6.44
1083
430.06
3279
14061 MWD+IFR-AK-CAZ-SC(2. 5)
24,30000
0940
152.18
7,53683
6866
5.30
421.60
1.59
8869
8.44
1089
43028
3298
14063 MWD+IFR-At(-CAZ-SC(2, 5)
24.400.00
89.48
152.18
7,537.53
66.85
0.38
421.84
1.59
66.89
8.44
10.96
430.49
33.17
140.64 MWD+IFR-M.0C -SC (2, 5)
24.500.00
8948
152.10
7,538.44
67.04
-8.38
422.08
1.59
67.08
6.44
11.02
430.72
33.36
140.66 MWD+IFR.AK-C -SC (2, 5)
24,600.00
89.48
152.18
7,539.35
6124
-8.38
422.32
1.59
67.28
844
1109
43094
3355
140.67 MWDMFR-AK-CAZ C(2. 5)
24,700.00
8948
152.18
7,540.25
67.43
4.30
422.57
159
6]47
844
11.15
431,17
33.75
140.69 MWD+IFR-AK-CAZ-SC(2, 5)
24,800.00
09.40
15218
7,541.16
67,63
4.38
422.81
159
6167
8.44
11.22
431.40
3394
140]0 MWD+IFR-AK-CAZ-W(2.5)
24.900.00
8948
152.18
7,54207
67.83
838
42307
1.59
67.87
8.46
929
431.63
34.13
140.72 MM+IFR-AKCAZSC(2, 5)
25,00000
8948
152.18
7.542.97
68.03
-8.38
423.32
1.59
68.07
844
11.35
431.86
34.33
140.73 1AWD+IFR-AK-CA-SC (2.5)
25.100.00
89.48
152.18
7,543.88
68.23
-038
423.58
1.59
6827
8.44
11.42
432.10
3452
14075 MWD+IFR-AK-CAZSC(2.5)
25200.00
0948
152.18
7.544.78
6844
538
423.84
159
6847
8.45
1149
432.34
34.71
140.76 MWD+IFR-AK-CAZ-SC(2,5)
25,300.00
8948
152.18
7,54569
6864
5.38
424.10
1.59
68.68
8.45
11.56
43258
34.90
14078 MW IFR-AK-CAZ-SC(2, 5)
25.00000
8948
152.10
7.545.60
68.85
-8.38
424.37
159
68.88
845
1163
432.83
35.10
140.80 MWDAFR-AR-CAZ-SC(2, 5)
25,500.00
8948
152.18
7,547.50
69.05
-8.38
42463
1.59
Sam
845
1130
43308
35.29
14081 MWV+IFR-ARCA-SC(2,5)
25,00.00
8948
152.18
7.548.41
6926
838
424.91
1.59
6930
845
11.77
43333
3548
140.83 MWD+IFR-M.,WSC 12.5)
25,700.00
09.48
152.18
7,54931
6947
538
425.18
1,59
69.51
845
11.84
433.59
3560
140.85 MW +IFR-AK-CAZ-SC(2, 5)
25.800.00
8948
152.10
7,550.22
69.68
-8.38
42548
1.59
69.72
8.45
11.92
433.84
35.87
140,86 MWD+IFR-AK-CAZ-SC(2,5)
25,900.00
Was
152.18
7.551.13
6989
-838
425.74
1,59
69.93
845
11.99
434.11
36.07
140.80 MWD+1FR-AK-CA2-SC(2, 5)
26,00000
8948
152.18
7,6520:1
70.11
-838
426.02
1.59
70.14
8.45
1206
434.37
38.28
14090 MWD+IFR-AK-CA-SC(2, 5)
26,10000
8948
152.18
7,55294
7032
838
426.31
1.59
7038
8.45
12.13
434.63
3645
140.91 MWD+IFR-AK-CA SC(2,5)
26,200.00
0948
152.18
7,553.85
70.54
4.3B
428.60
1.59
70.57
045
1221
434,90
36.65
140.93 MWD+1FR-AK-CAZ-SC(2, 5)
26,300.00
8948
152.10
7.554.75
70.75
-8.38
426.89
1.59
70.79
8.46
1228
435.18
36.84
140.95 MWD+IFR-AK-CAZ-SC(2, 5)
28,400.00
8948
152.18
7,555%
70.97
-an
427.19
1.59
71.01
846
12.36
43545
37.03
14096 MW0+IFR-M-CAZ-SC(2, 5)
26,50000
8948
152.18
7.556.56
71.19
0.38
42748
159
71.23
846
12.43
43573
3123
140.98 MWD+IFR-AK-0A2-SC(2, 5)
26,600.00
8946
152.18
7,55147
71.41
5.30
42770
1.59
7145
8.46
1251
438.01
37.42
141.00 MWD+IFR-AK-CASC(2, 5)
26.700.00
89.48
152.10
7,558.38
71.63
-8.38
428.09
1.59
7167
8.46
1258
438.29
37.61
14102 MWD+IFR-AK-CAZ-SC(2, 5)
4/11/2019 9:23.03AM Page 5 COMPASS 5000.14 Build 85D
Company:
ConocoPhillips Alaska lnc WNS
project:
Westem North Slope
Site:
CDs Alpine West Pad
Well:
Plan: CD5-98 (11 B)
Weltbore:
CD5-981-1
Design:
C05-9811 wp04
Position uncertainty and blas at survey station
ConocoPhillips
Error Ellipse Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 @ 74.70usft (D25)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
2.00 sigma
OAKEDMPI
Measured
Incllnafipn
A9muth
wmr .l
Ri9h.ide
lateral
vmmal
Ma9aiad.
Semlmal.r
Sarni -minor
Cep&
pep&
E.,
Blas
Error
Blas
Error
Bias
.1 Blas
Ermr
Error
Puma& Tool
(dam
(9
N
I..N
Nan)
(u.n)
(uan)
Nan)
(.an)
(9.n)
(usn)
(uan)
(oss)
11)
28800.00
89.48
152.18
7,559.28
7195
B38
428.40
1.59
7169
8.46
1266
436.58
37.80
14103 MVA+IFR-AKCA-SC(2. 5)
26,900.00
8948
152.18
7,560.19
7208
-8.38
42870
1.59
7211
846
12.74
436.86
30.00
14105 MM-IFRR AK- CP -SC (2, 5)
27,000.00
8948
152.18
7,561.09
72.30
-0.38
429.02
1.59
7234
846
12.81
43715
38.19
141.07 MM -IFR AK -CA -SC (2r 5)
27,100.00
8940
152.18
7.562.00
72.53
-038
429.33
159
72.58
846
12.89
437,45
38.38
141.09 MVA+IFRAK-CA-SC (Z 5)
27.200.00
89.40
152.18
7,56291
7275
4.38
429.65
1.59
7279
848
1297
437.74
3858
14111 MWD.iFR-AK-CA-SC(2, 5)
27,30000
89.48
15218
7,663.81
7298
5.38
42997
1.59
7101
847
1305
438.04
38.77
141.12 MWD+1FRAKLALSC(2, 5)
27,400.00
89.48
152.18
7,554.72
73.21
5.38
430,29
1.59
73.24
e47
13.13
438.35
38.96
141.14 MWD+IFR-AK-CA -SC (2, 5)
27,500.00
0948
15218
7,565.63
73.44
-838
430.62
1.59
7347
8.47
13.21
438.65
39.15
WAS MWD+IFR-AWCALSC(2, 5)
27,00.00
Was
152.18
7,566.53
73.67
430
43095
1.69
73.70
847
13.29
438.98
3934
141.18 MWD+IFR-AK-CA-SC(2, 5)
2770000
89.48
152.18
7,56744
MM
5.38
431.28
1.59
7393
8.47
13.37
439.27
39.54
141.20 MWD+IFR-AK-CMSC(2,5)
27,80000
8948
152.18
7,568.34
74.13
-838
43162
1.59
74.17
847
1345
43958
39.73
141.22 MWD+IFR-M.CA SC (2, 5)
27,900.00
89.48
152.18
7,569.25
74.37
-am
431.96
159
74.40
B.47
1353
43990
39.92
14123 M IFR-AK-CMSC (2, 5)
20,00000
89.48
152.18
7,570.16
74.60
-838
432.30
159
74.64
847
13.61
44022
40.11
141.25 MM -IFR AK-CA-SC(25)
28.100.00
8948
152.18
7,57106
74.84
5.30
432.84
1.59
74.87
847
1369
440.54
40.30
1412]MWD+IFR-AK-CA-SC(2, 5)
28,20000
89.48
152.18
7,571.97
75.07
5.38
43299
1.59
75.11
8.47
1077
440.85
4049
141.29 MM+IFR-AK-CA2 C(2.5)
28.300.0
8948
1$2.18
7,572.88
75.31
-8.38
43333
1.59
75.35
0.47
13.85
441.19
4068
14131 MW0+IFR-AK-CAZSC(2.5)
28,40000
8948
152.18
7,573.78
75.55
-0.38
433.69
159
75.58
&0
13.93
44162
40.87
14133 MWD+IFR-AK-CA -W(2, 5)
20.500.00
8948
152.18
7,57669
7579
-038
434.04
1.59
75.82
848
1402
441.85
4108
141.35 MWD+IFR-AK-CAZSC(2,5)
28.800.00
09.48
152.18
7.575.59
76.03
4.38
434.40
1.59
78.03
848
14.10
442.18
41.25
141.37 MWD+IFR-AK-CA -SC (2, 5)
28.70000
8948
152.18
7,578.50
76.27
-8.38
43476
1.59
76.30
848
14.18
442.52
4144
141.39 MWD+IFR-AK-CASC(2, 5)
28,800.00
89.48
152.18
7,577,41
76.51
-0.38
435.12
1.59
78.55
848
14.27
44286
41.63
141.41 MWD+1FR-AK-CA-SC(2. 5)
20.900.00
8948
152.18
7,578.31
7876
-8.38
43548
169
76.79
8.48
14.35
44320
41.82
141.43 MWD+IFR-N(-CA-SC(2, 5)
29,000.00
0940
15218
7,579.22
7)00
-8.38
435.85
1.59
77.03
8.48
1443
44155
42.01
14145 MW IFRA&CA -W(2, 5)
29.10.0
0948
152.18
7,580.12
77.25
4.38
436.22
1.59
A.28
848
1452
443.90
4220
14147 MWD+IFR-AK-CA -SC (2, 5)
29,200.00
8948
152.18
7,581.03
77.49
4.38
43660
1.59
7152
848
140
44425
4239
14149 MWD+IFR-AK-CAZ C(2, 5)
2$300.00
8948
152.18
],581.94
77.74
-0.38
436.97
169
77.77
848
14.69
444.60
42.58
141.51 MWD.IFR-AK-CA-SC(2, 5)
29,400.00
8948
152.18
7,582.84
77.99
-838
437.35
1.59
78.02
8.49
14.77
444.98
42.77
141.53 MWD+1FR-AK-CA-SC(2.5)
29,500.0
0948
152.18
7.583.75
7824
838
437.73
1.59
78.27
849
lass
44531
42.95
141.55 MM+IFR-A3(-CMSC(2, 5)
29,600.00
Was
152.18
],58466
78.48
5.36
438.12
1.59
7852
849
14.94
44888
43.14
141.57 MWD+IFR-AK-CA -SG (2. 5)
29700.00
8948
152.18
7.505.56
7874
41.38
43851
1.59
7877
8.49
1503
446.04
4333
141.59 MWD+IFR-M-CMSC(2, 5)
29.0000
89.48
152.18
7,586.47
78.99
-0.38
438.89
159
79.02
849
15.11
44841
43.52
141.61 MWD+IFR-AK-CAZ C(2. 5)
29,900.00
8948
152.18
7,587.37
7924
-0.38
43929
1.59
79.27
8.49
15.20
446.77
4370
141.63 MWD+1FR-AK-CA-SC(2, 5)
30,000.00
8948
152.18
7,688.28
79.49
-0.38
43968
1.59
79.52
8,49
1529
447.15
43.89
141.65 MWD+IFR-AK CA -SC (2. 5)
30.100.00
0946
152.18
7,589.19
7974
4.38
440.00
1.59
79.78
849
1537
447.52
44.07
141.87 MWD+IFR-At(-C -SC (2, 5)
30$0000
8948
152.18
7,590.09
80.00
5.38
44048
1.59
8003
8.49
1546
447.90
44.26
141.69 MW IFR AK-CAZSC(2, 5)
30300.00
8948
152.18
7,591.00
8025
4.3a
44068
169
00.28
849
1555
40.28
4445
141.71 MWD+IFRAK-CAZSC(2, 5)
30,40000
8948
152.18
7,59190
80.51
-0.38
441,29
1.59
80.54
849
15.64
44866
4463
141.73 MWD+IFR-AK-CAZSC(2, 5)
30.50.00
8948
152.18
7,592.81
80.77
-8.38
441.70
159
80.80
8.0
1572
449.04
44.81
14175 MWD+1FR-AK-CA-SC(2, 5)
30,600.0
09.40
152.18
7,593.72
81.02
538
44211
1.59
81.05
6.50
15.81
44943
45.00
141.n MWD+IFR-AK-CALSC(2, 5)
30.70000
8948
152.18
7,594.62
8128
4.38
442.52
1.59
8131
8.50
1580
449.02
45.18
1410 MM+IFR-AK-CA-W(2, 5)
30,708.50
8848
152.18
7,594.70
81.30
-8.38
442.56
159
8133
8.50
15.91
44985
4520
141.80 MWD+IFRAI(-CP -SC (2, 5)
411112019 9:23'03AM Page 6 COMPASS 5000.14 Build 85D
Company:
Con=Phillips Alaska lnc_WNS
Project:
Western North Slope
Site:
CDS Alpine West Pad
Well:
Plan: CD5-98 (11 B)
Wellbore:
CD5-98L1
Design:
CD5-98L1 WP04
ConocoPhiliips
Error Ellipse Report
Local Co-ordinate Reference:
TVD Reference:
MD Reference:
North Reference:
Survey Calculation Method:
Output errors are at
Database:
Design Targets
Target Name
-hitlmiss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W
-Shape (1 (1) (usft) (usft) (usft)
CD5-98Ll T01 Heel 122 0.00 0.00 7,44970
- plan hits target center
-Circle (radius 100.00)
CD5-981_1 T02 Toe 1224 0.00 0.00 7,594.70
- plan hits target center
-Circle (radius 100.00)
Casing Points
Northing
(usft)
Well Plan: CD5-98 (11 B) - Slot 98
Plan D25 (d 74.70usft (D25)
Plan D25 @ 74.70usft (D25)
True
Minimum Curvature
2.00 sigma
OAKEDMPi
Eastmg
(usft) Latitude Longitude
Measured
Vertical
Local Coordinates
Casing
Hole
Depth
Depth
+E/ -W
Diameter
Diameter
(usft)
(usft)
Name
(in)
(in)
159.80
159.80
20
20.000
48.000
2,296.67
2,189.70
10-3/4x13-1/2
10.750
13.500
13,821.00
7,449.77
7-5/8 x 11
7.625
11.000
30,708.50
7,594.70
4-112x6-1/2
4.500
6.500
Plan Annotations
Measured
Vertical
Local Coordinates
Depth
Depth
+N/ -S
+E/ -W
(usft)
(usft)
(usft)
(usft)
Comment
13,820.00
7,449.48
5,251.39
-5,282.87
KOP: 15.9°/100' DLS, -25" TF, for 12.8'
13,832.80
7,452.92
5,242.01
-5,274.87
Hold for 30'
13,862.80
7,460.52
5,220.06
-5,255.87
Start 4.88°/100' DLS, 5.430 TF, for 515.48'
14,378.28
7,479.56
4,826.95
4,929.42
Hold for 16.11'
14,394.39
7,476.65
4,814.55
-4,919.54
Start 4.88°/100'DLS, 135" TF, for 312.73'
14,707.12
7,449.70
4,554.43
-4,749.74
Hold for 16001.38'
30,708.50
7,594.70
-9,597.52
2,716.55
TD: 30708.5' MD, 7594.7' TVD
Checked By: Approved By: Date:
411112019 923: 03AM Page 7 COMPASS 5000.14 Build 85D
Pool Report
15:08, March O62019
CD5-98L1
r(LL(O[ vue n,f,,.,1 eIhfl
wp04.1 [['YI,O,uIl4W19Y ,:,e
Quarter
([°%116 Ye 1]]<I6Y (IgafiaNa.l[«LI
Mile View
CO�1
`p-, O9.( �
't
W�1 `Q�SWQfi,
Cp5'SAWV' `pS.gzW�Dy.
8%Ikvi
dosO
1r1A�
7000
__,
.A
11y
500
350C-
C
N
9P ] I
1
0-
+
I
0,
�p5
O
3500
-350C-
0
O
VJ
li
M1 Oyq 1fi H ' 1y M1 ASPS',
s3 Gas M� G� M1P �Oy 9
-7000
Afip1
WP GO M1P
'
�� W�2 C Ap0
Al
M1fi 9b
DoH y Gp5' 11
315P81
-10500--
_— _. __ —_
5"`1 G� royg5 1��'�
-
�Ng9P
-4�� 5.315 1
ty4 - y t5 �CDY313 hfi�
-7000 -3500 0 3500 7000 10500 14000
-14000
-10500
West(-)/East(+) (3500 usft/in)
15:11, March N
W19
CD5-981_1 wp04.1
Quarter Mile View
ILLLLL IL 1/1111111/ U. 11 1(1 ILM IIH:
«-. ^G 11'1° i i€ ..', m
05
Closest Wells
g664
depth labels are
7000--
G0 6 ,
7200'tvd to600'tvtl
6
CD5-92 plan next to CD5-98
3500-
-CD5-25 actual next -to CD5-98
w
1A
CD5-23 actual next to CD5-98
]3.
CD5-90 plan within QM
j
CD5-26 plan within QM
CO
CD5-27 plan within QM
3
6
3500
-- —
_ —
o
w
"Q�
-7000
12
�Vr
GID�
72 7
CUSs1$PB1
]a 7
9 16 �ry6 rL�6 625,1
-10500
--
7
1-, ]6
'COS21sCOyy1
Yp0
16.
-14000
-10500 -7000 -3500
0 3500 7000 10500 14000
West( -)/East(+) (3500 usft/in)
CD5-98L1wp04.1 Surface Location -
—--------- -
B. CPAI Coordinate Converter
Datum:NAD83 Region: alaska
C Latitude/Longitude recimal Degrees
C UTM Zone:1 — r South
C•' State Plane Zone: F --]-]Units us -Ft
C Legal Description fNAD27 only)
❑ x
Datum. INAD27 Region: alaska
C Latitude/Longitude IDecimalDegrees
C UTM Zone: True r South
G State Plane Zone:F I Units: us -ft
3W
C Legal Description (NAD27 only)
Starting Coordinates: Ending Coordinates:- ----
X: 1489610.96 X: 349577.818477796
Y: 15965672.43 Y: 5965926.46025775
( Transform Quit I Help
CD5-98L1w 04.1 Surface Location
CPAI Coordinate Converter - ❑ x
Datum: NAD83 Region: akska li
C Latitude/Longitude IDecimalDegrees
C UTM Zone: F— r South
G State Plane Zone: F- --�-] Units: FUS ft
C Legal Description [NAD27 only]
;-Starting Coordinates:
X 1489610.96
Y: 15965672.43
Datum NAD27 Region: alaska
C Latitude/Longitude IDecimalDegrees
C UTM Zone: True r South
C Slate Plane Zone: Units: us -R
R Legal Desaiption (NAD27 only)
Township: 011 N . Ranga 004 I` J
Meridian U . $edion 1g
FNL -281.11736 FEL 2401.6215
Transform -) 4uit Heb
;D5 -98L1 p04.1 Surface Casing
M CPAI Coordinate Converter
Datum: NAD83 Region: alaska
• Latitude/Longitude Decimal Degrees
• UTM Zone: r— r- South
G State Plane Zone: [" :,:] Units: us -ft
• Legal Description (NAD27 only)
Starting Coordinates:
X: 11489307.45
Y: 1596SO49.25
Datum FN—AD-27----,l Region: ,!asks
f Latitude/Longilude IDecimalDegrees
r UTM Zone: True r South
C State Plane Zone: Units: us -ft
r Legal Descripfion (NAD27 only)
Ending Coordinates:
X: 1349274.319720197
Y: I 5966303.29210046
r._—_.._.___...__.-
ransform._. ..., quit Help
CD5-98Liw 04.1 Surface Casin
CPAI Coordinate Converter — ❑ X
Datum: NA683 Region: alaska
C Latitude/Longitude Decimal Degrees
C UTM Zone: �`— r South
C• State Plane Zone: F7-:1 Units: us -ft
l- Legal Description (NAD27 only)
Starting Coordinates:
X 1489307.45
Y: 5%6049.25
Datum: FEWRegion: alaska
r Latitucle/Longitude IDecimalDegrees
C UTM Zone: True r South
C State Plane Zone: 1" : Units: us -0
fi Legal Description (NAD27 ons )
Township: 011 FN—,l Range: pp4 [E-:,:]
Meridian:LI . Section:7
FNL. 5190.3631 FEL � 2711.2086
ETransform _ QUt I Help
M5-98L1wPO4.1 Kick-off Point TOW
M CPAI Coordinate Converter
From:
Datum: INAD83 I Regions lalaska
r LatitudelLongitude IDecimalDegrees
• UTM Zone: I — r South
G State Plane Zone: q . I Units: us -ft
• Legal Description (NAD27 only)
Datum INAD27 I Region:alaska
r Latitude/Longitude IDecimalDegrees —�
t' UTM Zone True r South
R State Plane Zone: I" J Units: us -Ft
C Legal Description (NAD27 only)
Starting Coordinates: Ending Coordinates:
x: 1484435.02 X: 344402.023210079
Y: 15971028.47 N 5971282.70943582
lwp04.1 Kick-off Point
4 CPAI Coordinate Converter
Datum: NAD83 3 Region jalaska
r Latitude/Longitude Decimal Degrees
(' UTM Zone: f— r South
C State Plane Zone: Iq Unittt urft
i Legal Descrphon (NAD27 only)
Starting Coordinates:
Y' 11484435.02
Y: 15971028.47
Transform Quit Help
— ❑ x
Datum: NAD27 Region: alaska
• Latitude/Longitude Decimal Degrees
f•UTM Zone True r South
r' State Plane Zone: F-----3 Units: us ft
G` Legal Description (NAD27 only)
Legal
Township: D71 N Range: 003
Meridian I" D Section: 12
FNL 311.08801 FEL � 2756.8657
'-- — -- quit Help
P
CD5-98L1wp04.1 Top of Production Alpine A
Q CPA] Coordinate Converter —
Datum: NAD83 Region: alaska
• Latitude/Longitude IDecimal Degrees J
r UTM Zone: I — r South
G State Plane Zone: I' J Units: us-lt
r Legal Desctiplion (NAD27 only)
❑ _ x
Datum: INAD27 I Region: alaska
r: Latitude/Longitude IDecimal Degrees
f• UTM Zone: True r South
• State Plane Zone: 1' � Units: us -ft
• Legal Description (NAD27 only)
Starting Coordinates: Ending Coordinates:
X: 11484366.53 X: 344333.535757513
Y: 15971113.52 Y: 15971367.76290057
)�—�TmnsForm quit Help
1 Top of
M CPAI Coordinate Converter
Datum: NAD83 Region: alaska
r Latitude/Longitude IDecimal Degrees J
r UTM Zone: I — r South
StatePlane Zone: 1' Units: us -ft
i Legal De>cnplion INAD^c7 onlyj
Starting Coordinates:
Y, 11484366.53
Y: 5971113.52
A
- ❑ x
Datum: NAD27 Region: alaska
C Latitude/Longitude IDecimal Degrees J
f UTM Zone: True r South
C Slate Plane Zone: 1' D Units: us -ft
r Legal Description (NAD27 only)
Township: 011 I"J Range: 003 I` J
Meridian: U . Section:l2
FFD 227.46977 FEL 2827.0792
{� Transform _.! Quit Help
1WD04.1 TD
Q CPAI Coordinate Converter
Datum: NAD83 Region: alaska
r Latitude/Longitude IDecimalDegrees J
r- UTM Zone: F— r South
G State Plane Zone: F--:-:1 Units: us -ft
C' Legal Description (NAD27 only)
Sterling Coordinates: -----
X: 1492134
Y: 15956023
Datum: NAD27 . Region: alaska
r LatRude/Longitude IDecimalDegrees
* UTM Zone: True r South
C• State Plane Zone: F7:-:1 Units: us -Ft
r Legal Description (NAD27 only)
Ending Coordinates:
X: 352100.489181218
Y: 5956276.88368823
r'--'----..-..._..-'----
1...__.._... TranaForm _ Quit Help
CD5-98L1w 04.1 TD
CPAI Coordinate Converter - ❑ X
Datum: NADg3 Region: alaska .
C Latitude/Longitude IDecimal Degrees
r UTM Zone:I— r South
G State Plane Zone:q . Units: us -ft
r Legal Description (NAD27 only)
Starling Coordinates:
X 1492134
Y: 5956023
Datum: NAD27 Region: alaska .
• Latitude/Longitude IDecimalDegrees
f UTM Zone: True r South
{^ Stale Plane Zone: I' -7J Units: us -ft .
C•' Legal Deecrlption (NAD27 only)
Township: 011 � Ranga OOq E .
Meridian: )" J Section: 20
FNL . 4599.4292 FEL 5002.7588
I
r" --..._..__._-_.._.... Quit Help
( Transform
REV I DATE I BY
I CrAPP DESCRIPTION I REV DATE BY
I CK I APP I DESCRIPTION
1 4/24/15 1 CZ
I DB I C. A. 1 UPDATED PER K150003ACS 12 5/2/16 CZ
I GD C. A. UPDATED PER K160003ACS
ALPINE SATELLITE DEVELOPMENT
LOCATION OF
THIS SURVEY
T12
cD-5
PAD
Q
11N
CDS # .r�`"`•� CD4 TO ALPINE
ACCESS ROAD
,.
CD
N
HrA�rr•.=�
0
v`
m0
zD
LL
IT001
VICINITY MAP
NOT TO SCALE
LEGEND:
O PROPOSED CONDUCTOR
• EXISTING CONDUCTOR
SECTION 7, T. 11 N., R. 4 E., U.M.
SECTION 18, T. 11 N., R. 4 E., U.M.
pP�
CD-5
OF noo
PAD
pES�GN SNOV`DER
��Qao�,�s�1�N�x000�m
01`aj1 ��ON NN O-
O� up�p
T
PLANT
N
N
0
NOTE:
15'4o 52"
p O
CONDUCTOR
CD5-x14 WAS PLUGGED AND
p
ABANDONED
APRIL 2016. cME
m
KUUKPIK
m
UMIAQ
ALPINE SURVEY OFFICE
PHONE-907-6704739
ALPINE
MODULE:CD50 UNIT: CD
ConocoPhillips
ALPINE
PROJECT
CD-5
WELL CONDUCTORS
Alaska, Inc.
AS-BUILT
LOCATIONS
CADD FILE NO.
DRAWING NO:
PART:
REV:
15-03-02-1
04/18/2015
1 CE-CD50-1025
1 1 OF 3
2
1 4/24/15 1 CZ I DB I C. A. 1 UPDATED PER
K150003ACS
12 15/2/161 CZ I
GD I
C. A.
I UPDATED PER
K160003ACS
49.211
151' 13
20.820
287
2508
27.5
ALL CONDUCTORS ARE LOCATED
IN PROTRACTED SEC.
18,
T
11 N, R 4
E, U.M.
WELL 'Y' 'X' LAT.(N) LONG.(W) SFNL INEIF LS GNO EXIST.PAD
CD5-x99
5,965,666.90
1 489
591.67
70' 18
49.211
151' 13
20.820
287
2508
27.5
33.9
CD5-x01
5,965,661.64
1 489
572.44
70' 18
49.155
151'
'1321.378
293
2489
27.6
34.1
CD5-x02
5,965,656.28
1 489
553.29
70' 18
49.099
151' 13
21.934
299
2470
28.1
34.1
CD5-x03
5,965,650.92
1 489
534.00
70' 18
49.042
151 13
22.493
305
2451
_f8_ _4
34.1
CD5-x04
5,965,645.24
1 489
514.77
70' 18
48.982
151' 13
23.051
_S1 �1
2432
26.6
34.2
CD5-x05
5,965,639.80
1 489
495.46
70' 18
48.925
151' 13
23.611
316
2412
28.1
34.3
CD5-x06
5,965,634.56
1 489
476.20
70' 18
48.870
151' 13
24.170
322
2393
27.7
34.3
CD5-x07
5,965,629.08
1 489
457.08
70' 18
48.812
151'
'1324.724
328
2374
27.9
34.3
CD5-x08
5,965,623.88
1 489
437.69
70' 18
48.757
151' 13
25.287
334
2355
28.1
34.3
CD5-x09
5,965,618.27
1 489
418.53
70' 18
48.698
151' 13
25.842
340
2336
27.3
34.2
CD5-x10
5,965,613.12
1 489
399.13
70' `18
_Y51' 13
26.405
345
2317
28.1
34.1
CD5-x11
5,965,607.66
1 489
379.86
70' 18
48.586
151' 13
26.964
351
2297
27.9
34.1
CD5-x12
5,965,602.23
1 489
360.56
7o' 18
48.529
151' 13
27.524
357
2278
28.0
34.1
CD5-x13
5,965 596.59
1 489,341.43
70' 18
48.470
151' 13
28.079
363
2259
26.1
34.2
.,�
i. 489,322.33
-79'!8-;
8.114-
95i= }3-z6-633-
3fr8-
3z40-
27.6
34.2-
CD5-14X
5,965,589.94
1 489317.35
70' 18
48.400
151' 13
28.777
370
2235
27.5
33.8
CD5-x15
5,965,586.10
1 489
303.11
70' 18
48.359
151' 13
29.190
373
2221
26.8
34.2
CD5-x16
5,965,580.48
1 489,283.58
70' 18
48.300
151' 13
29.757
380
2202
27.6
34.0
CD5-x17
5,965,575.11
1489264.31
70' `18
151' 13
30.316
386
2183
27.7
34.0
CD5-x18
5 965 569.79
1,489,245.23
70' 18
48.187
151' 13
30.869
391
2164
27.7
33.9
CD5-x19
5,965,564.42
1 489
225.90
70' 18
48.131
151' 13
31.430
397
2144
28.0
33.9
CD5-x20
5,965,558.96
1 489
206.70
70' 18
48.073
151' 13
31.987
403
2125
1 25.8
33.8
CD5-x21
5,965,553.51
1 489
187.22
70' 18
48.016
151' 13
32.552
409
2106
27.8
33.8
CD5-x22
5,965,548.14
1 489
168.15
70' 18
47.959
151' 13
33.105
415
2087
27.7
33.7
CD5-x23
5,965,542.72
1,48
70' 18
47.902
_T51' 13
33.666
420
2068
26.4
33.7
CD5-x24
5,965.537.42
1.489.129.64
70' 18
_T7 84-6
151' 13
34.222
_T2 �6
2049
28.0
33.7
CD5-x25
5.965.532.01
1 489 110.28
70' 18
47.789
151' 13
34.783
432
2029
27.7
33.7
CD5-x26
5 965 526.59
1,489,091.09
70' 18
47.732
151' 13
35.340
438
2010
26.3
33.7
CD5-x27
5,965,521-20
1489071.88
70' 18
47.675
151' 13
35.897
444
1991
27.5
33.7
CD5-x28
5,965,515.81
1 489
052.48
70' 18
47.618
151' 13
36.460
449
1972
27.4
33.6
CD5-x29
5,965,510.40
1 489
033.34
70' 18
47.561
151' 13
37.015
455
1953
27.6
33.6
CD5-x30
5 965 504.97
70' 18
47.504
151' 13
37.575
461
1934
25.3t3M3653
965 499.57
1 489
994.73
70' 18
47.447
151' 13
38.135
467
1915
26.6CD5-x32
5 965 494.13
1
5.45
70' 18
47390
151' 13
38.694
473
189526.6CD5-x33
5 965 488.75
1 488
956.35
70' 18
47333
151' 13
39.248
478
1876
27.0
Should be
1,488,994.73
NOTES
1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE
4, NAD 83.
2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL KUUKPIK
(B.P.M.S.L.) U M I A Q
3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL,
2016. ALPINE SURVEY OFFICE
PHONE: 907-670.4739
ALPINE MODULE:CD50 UNIT: CD
ConocoPhillips ALPINE PROJECT
CD -5 WELL CONDUCTORS
Alaska, Inc. AS -BUILT LOCATIONS
CADD FILE N0. DRAWING N0: PART: REV:
15-03-02-1 04/18/2015 1 CE-CD50-1025 1 of 3 2
i
■ Tier 1: Standard
• Intervals without issues noted for Tier 2 or 3
■ Tier 2: Challenging Orientation
• Drillingwithin 30°of horizontal inclination AND drilling within 300of magnetic
East/West azimuth in extreme northern or southern locations
■ Tier 3: Critical Steering
Driller's Target of 50' Radius or Less
• Lease line constraint
• Small Geologic Target
■ Failure of Major Risk Rule (Close Approach)
• Defined during directional planning, based on the positional uncertainty
• Theoretical intersection of the path of the well being planned with an offset well
• If HSE risks are eliminated, the Tolerable Collision Risk assessment can be implemented
■ Tier 4: Single section containing both Tier 2 and Tier 3 challenges
■ Tier 1 (Standard):
• Directional interval across which no special mitigations are needed
■ Tier 2 (Challenging Orientation):
• Increase non-magnetic insulation of MWD tool in the BHA
• Take rotational check shots and/or increase survey frequency at the start of a BHA run
• Alter well directional plan, if feasible
• Consider gyro surveys where feasible
■ Tier 3 (Critical Steering):
• Increase survey frequency across critical interval
• Increase correction frequency across critical interval
• Take rotational check shots and/or increase survey frequency if the critical interval is at the
start of a BHA run
• Define escalation based on deviation from plan
• Minor Risked close approach intervals with a high financial or scope risk should strongly
consider the use of relevant mitigations
■ Tier 4 (Critical Steering & Challenging Orientation):
• Consider all Tier 2 & 3 mitigations
ei ]eCwoeoFhillips
TRANSMITTAL LETTER CHECKLIST
WELL NAME: G R (, C b 5— 9<� �_ I
/ PTD: 19 — 060
VDevelopment Service _ Exploratory _ Stratigraphic Test _ Non -Conventional
FIELD: G 0 1 V t 1 1 P_ R l Vey ynl'OOL: Alpine. /
Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter
CHECK
OPTIONS
TEXT FOR APPROVAL LETTER
MULTI
The permit is for a new wellbore segment of existing well Permit
LATERAL
No.',19-05a9 , API No. 50 -J03 -'a080 3 L__--0/).�
`//
(If last two digits
Production should continue to be reported as a function of the original
in API number are
API number stated above.
between 60-69
In accordance with 20 AAC 25.005(f), all records, data and logs
acquired for the pilot hole must be clearly differentiated in both well
Pilot Hole
name ( PH) and API number (50- -
from records, data and logs acquired for well
name on permit).
The permit is approved subject to full compliance with 20 AAC 25.055.
Approval to produce/inject is contingent upon issuance of a conservation
Spacing Exception
order approving a spacing exception. (Company Name) Operator
assumes the liability of any protest to the spacing exception that may
occur.
All dry ditch sample sets submitted to the AOGCC must be in no greater
Dry Ditch Sample
than 30' sample intervals from below the permafrost or from where
samples are first caught and 10' sample intervals through target zones.
Please note the following special condition of this permit:
production or production testing of coal bed methane is not allowed for
Non -Conventional
(name of well) until after (Company Name) has designed and
Well
implemented a water well testing program to provide baseline data on
water quality and quantity. (Company Name) must contact the AOGCC
to obtain advance approval of such water well testing program.
Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of
J
well logs to be nm. In addition to the well logging program proposed by
(Company Name) in the attached application, the following well logs are
also required for this well:
Well Logging
Requirements
Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071,
composite curves for well logs run must be submitted to the AOGCC
within 90 days after completion, suspension or abandonment of this well.
Revised 2/2015
Loepp, Victoria T (DOA)
From: Marushack, Andy 1 <Andy.J.Marushack@conocophillips.com>
Sent: Wednesday, May 1, 2019 7:59 AM
To: Loepp, Victoria T (DOA)
Subject: RE: [EXTERNAL]CRU CD5-98(PTD 219-059); CD5-98L1(PTD 219-060) Pressures
Attachments: 2. C135-98 10-401.xis; 2. CD5-981-1 10-401.xis
Follow Up Flag: Follow up
Flag Status: Flagged
Hello Victoria,
Sorry about that. After discussing with our Reservoir Engineer, the latest max predictions for formation pressure are
3,700 psi. I have Updated the 10-401 applications and copied the calcs below. Please let me know if there is anything
else I can do to help.
Sincerely,
Andy
CD5-98
Casing Size
(in)
Csg Setting Depth
MD/TVD(ft)
Fracture
Gradient(ppg)
Pore pressure
(psi)
ASP Drilling
(psi)
20
120/120
10.9
51
56
10.75
2,296/2,189
14.5
964
1,432
7.625
14,250/7,514
12.5
3,700
3,167
4.5
31,844/ 7,749
12.5
3,700
n/a
1. ASP CALCULATIONS
Drilling below 20" conductor
ASP = [(FG x 0.052) - 0.1] D
_ [(10.9 x 0.052) - 0.1] x 120 = 56 psi
OR
ASP =FPP-(0.1 xD)
= 977 - (0.1 x 2190') = 745 psi
2. Drilling below 10-3/4" surface casing
ASP = [(FG x 0.052) - 0.11 D
_ [(14.5 x 0.052) - 0.1 ] x 2189' = 1432 psi
OR
ASP = FPP - (0.1 x D)
- 3700 - (0.1 x 7514') = 2949 psi
3. Drilling below 7-5/8" intermediate casing
ASP = [(FG x 0.052) - 0.1 ] D
_ [(12.5 x 0.052) - 0.1 ] x 7514 = 4132 psi
OR
ASP= FPP - (0.1 x D)
-- 3700- (0.1 x 7749') = 2925 psi
CDS -98 L3
Casing Size
(in)
Csg Setting Depth
MD/VD(ft)
Fracture
Gradient(ppg)
Pore pressure
(psi)
ASP Drilling
(psi)
20
120/120
10.9
51
56
10.75
2,296 / 2,189
14.5
964
1,432
7.625
14,250/7,514
12.5
3,700
3,167
4.5
30,708/ 7,594
12.5
3,700
n/a
2. ASP CALCULATIONS
4, Drilling below 20" conductor
ASP = [(FG x 0.052) — 0.1 ] D
= [(10.9x0.052) -0.l] x 120= 56 psi
OR
ASP = FPP — (0.1 x D)
= 977 — (0.1 x 2190') = 745 psi
Drilling below 10-3/4" surface casing
ASP = [(FG x 0.052) — 0.1] D
_ [(14.5 x 0.052) — 0.11 x 2189' = 1432 psi
OR
ASP = FPP — (0.1 x D)
= 3700 — (0.1 x 7514') = 2949 psi
6. Drilling below 7-5/8" intermediate casing
ASP = [(FG x 0.052) — 0.1 ] D
= [(12.5 x 0.052) — 0.11 x 7514 = 4132 psi
OR
ASP = FPP —(0.1 xD)
= 3700— (0.1 x 7594') = 2940 psi
From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov>
Sent: Tuesday, April 30, 2019 10:32 AM
To: Marushack, Andy J <Andy.J.Marushack@conocophillips.com>
Subject: [EXTERNAL]CRU CD5-98(PTD 219-059); CD5-98L1(PTD 219-060) Pressures
Andy,
k
The pore pressures and MPSP on the 10-401 form versus the ASP calculations are inconsisteno¢. Please review and send
me revised pressures or calculations.
Thanx,
Victoria
Victoria Loepp
Senior Petroleum Engineer
State of Alaska
Oil 8 Gas Conservation Commission
333 W. 7th Ave
Anchorage, AK 99501
WELL PERMIT CHECKLIST Field 8 Pool COLVILLE RIVER, ALPINE OIL - 120100
Well Name: COLVILLE RIV UNIT CD5-98L1 Program DEV Well bore seg
PTD#:2190600 Company CONOCOPHILLIPS ALASKA INC. Initial Class/Type
DEV / PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal
Administration
1
Permit fee attached. . . . . . . . . . ................
NA....
-
2
Lease number appropriate- - - - - - - - - - - - - -
Yes
- - - - - - - - - - - - - - - - - -
13
Unique well name and number
Yes
4
Well located in a -defined pool.. - - - - - - - - - - - - - - - ------- .... - -
Yes
5
Well located proper distance from drilling unit boundary- - - - - - - - - - - - -------- -
Yes
- - - - - - - - - - - - - - - -
6
Well located proper distance from other wells. - .... - - _ - - _ ...
Yes
- - - - - -
7
Sufficient acreage available in. drilling unit- - - - - - .... ...... _ _ _ -
Yes
8
If deviated, is wellbore plat. included - - - - - - - - - - - - - - - - - - - - - --------
Yes
- Directional. plan view and wellbore cross-section included.. - - - -
9
Operator only affected party ... ............. -----------.
Yes--
10
Operator has. appropriate bond in force - - -- - ---- - - - - - - - - - - - - - - - - - -
Yes
- -
11
Permitcan be issued without conservation order . . . . . . ......................
Yes
Appr Date
12
Permit can be issued without administrative approval - _ - -
Yes
13
Can permit be approved before 15 -day wait. - .. - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
... _ .. ......... ... .... .
DLB 4/16/2019
14
Well located within area and strata authorized byInjectionOrder # (put IO# [ncpmments).(For-
NA- -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15
All wellswithin1/4mile area of review identified (For service well only)- - - ----- - - - - - - -
NA_
16
Pre -produced injector; duration of pre production less than -3 months (For service well only) ..
NA.............................................................
17
Nonconven, gas conforms to AS31,05:030(L1•A).0,2.A-D) - - - - - - - -- - -- - - - - - - - - -
NA_
18
Conductor string.provided ___ _ _ _ _ _ _ _ _ _ _ _ - -
NA. -
- - - _ Conductor set for -CRU CD5.99-
Engineering
X19
Surface casing. proteots allknown_ USDWs - _ - ... ..... ......... _ -
NA
- - - - - - - - - - - - - - - - - - -
20
CMT vol adequate to circulate on conductor 8 surf_csg - - - - - - - - - - - - - - -------
NA -
_ - _ - 167% excess planned for CRU-CD5-99-
21
CMT. vol, adequate to tie-in long string to surf csg...... - - - - - - - ....
NA
_ - - _ ........ .. - . .... .. - .. -
22
CMT -will cover all known productive horizons... . .......... . . . . . . . .
No -
_ - - _ Productiveintervalwill be completed with uncemented liner with pert pups - - - - -
23
Casing designs adequate for CJ. 6 &-permafrost- - - - - - - - - - - - - ------ - - - - - -
Yes
24
Adequate tankage. or reserve pit - . . . .................
Yes -
- - Rig has steel tanks; all waste to approved disposal well
25
If a re -drill, has a 10-403 for abandonment been approved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____
NA
26
Adequate wellbore separation proposed . .. . ....... . . . - _ - - - - _ ..
Yes
- - - Anti -collision analysis complete; no major risk failures - - - - - -
27
If diverter required, does it meet regulations. - - - - - - - - - - -
NA- -
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Appr Date
28
Drilling fluid program schematic & egaip list adequate- _ - - _ - - - - - _ - ......
Yes
- - Max formation pressure is 3700 psig(9.5.ppg EMW);-will drill w/ 9.0710.8 ppg EMW
VTL 5/1/2019
29
BOPEs, do they meet regulation - _ - - - - - .....
Yes
30
BOPE press rating appropriate; test to.(put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes
. MPSP is 2925 psig; will test 60Ps-to 3500psig.............. - -
31
Choke. manifold complies w/API_RP-53 (May 64)...... - - .. - -
Yes
32
Work will occur without operation shutdown- - - - - - - - - - - - - - - - ........ -
Yes -
- - - - - - - - - - - - - - - - - - - - - - -
33
Is presence of H2S gas probable. _ . _ - - -
No...
... . .
34
Mechanical condition of wells within AOR verified (For service well only) - - ....
NA .....
. . . .. . ............. . . . . . . . . . . . . . . . . ................. .
35
Permitcan be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Yes ..
- .. H2S not encountered in offset wells.- However,. rig will be. equipped with operational sensors/alarms.
Geology
36
Datapresentedon potential overpressure zones ............ ....... . . . . .
Yes
Appr Date
37
Seismic analysis of shallow gaszones- - - - - - - - - - - - - - - - -- - -------- - - - -
NA
- - - - - - - - - - - - - - - - - - -
DLB 4/16/2019
38
Seabed condition survey.(if off -shore) . . . . . . . ..................... - -
NA
139
Contact name/phone for weeklypfogress reports [exploratory only] - - - - - - ........
NA
Geologic Date: Engineering Date Public Date
Commissioner: Commis ioner: Commissioner
6141 el
0