HomeMy WebLinkAbout219-0601. Operations Abandon Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Performed: Suspend Perforate Other Stimulate Alter Casing Change Approved Program Plug for Redrill Perforate New Pool Repair Well Re-enter Susp Well Other: ______________________ Development Exploratory Stratigraphic Service 6. API Number: 7. Property Designation (Lease Number): 8. Well Name and Number: 9. Logs (List logs and submit electronic data per 20AAC25.071): 10. Field/Pool(s): 11. Present Well Condition Summary: Total Depth measured feet feet true vertical feet feet Effective Depth measured feet feet true vertical feet feet Perforation depth Measured depth feet True Vertical depth feet Tubing (size, grade, measured and true vertical depth) Packers and SSSV (type, measured and true vertical depth) 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: 13. Prior to well operation: Subsequent to operation: 15. Well Class after work: Daily Report of Well Operations Exploratory Development Service Stratigraphic Copies of Logs and Surveys Run 16. Well Status after work: Oil Gas W DSPL Electronic Fracture Stimulation Data GSTOR GINJ SUSP SPLUG Sundry Number or N/A if C.O. Exempt: Contact Name: Authorized Title: Contact Email: Contact Phone: 2. Operator Name: Senior Pet. Engineer: Senior Res. Engineer: CollapseBurstTVDLengthCasing Authorized Signature with date: Authorized Name: 5. Permit to Drill Number: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Size 14. Attachments (required per 20 AAC 25.070, 25.071, & 25.283) Gas-Mcf measuredPlugs Junk measured STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS 3. Address: 4. Well Class Before Work: Representative Daily Average Production or Injection Data Casing Pressure Tubing PressureOil-Bbl measured true vertical Packer WINJ WAG Water-Bbl MD 15.Well Class after work: Exploratory Development ServiceStratigraphic 16.Well Status after work:Oil Gas WDSPL a GSTOR GINJ SUSP SPLUG 5.070, 25.071, & 25.283) WINJ W AG tion: tion: Gas-Mcf Representative Daily Average Production or Injection Data Casing Pressure Tubing PressureOil-Bbl W ater-Bbl summary: olumes used and final pressure: epth feet epth feet true vertical depth) d and true vertical depth) Plug Perforations Fracture Stimulate Pull Tubing Operations shutdown Perforate Other Stimulate Alter Casing Change Approved Program Perforate New Pool Repair Well Re-enter Susp Well Other: ______________________ Development Exploratory Stratigraphic Service 6. API Number: mber):8.Well Name and Number: onic data per 20AAC25.071):10.Field/Pool(s): ry: ured feet feet tical feet feet ured feet feet tical feet feet CollapseBurstTVD 5.Permit to Drill Number: Size measuredPlugs Junkmeasured 4. W ell Class Before W ork: measured true vertical Packer MD Form 10-404 Revised 3/2020 Submit Within 30 days of Operations By Samantha Carlisle at 11:22 am, Nov 05, 2020 ConocoPhillips Alaska, Inc. PO Box 100360, Anchorage, AK 99510 219-060 50-103-20803-60-00 ASRC-NPR2, ASRC-NPR3, ASRC-NPR4, ASRC-AA0092344 CD5-98L1 None Colville River Field/Alpine Oil Pool 29480 7562 None None 26819 7539 14159 7439 Conductor 80' 20" 120 120 Surface 2247' 10.75" 2286 2177 Intermediate 14325' 7.625" 14362 7480 Slotted Liner 12664' 4.5" 26825 7539 14182 - 26825 7443 - 7539 see attached see attached see attached 14182' - 26825' MD Please see attached summary 798 948 1082 1810 594 no test available N/AKaylie Plunkett Senior Production Engineer Kaylie Plunkett Kaylie.B.Plunkett@conocophillips.com 265-6450 Scale Inhibition ✔ ✔ ✔✔ ✔ Kaylie Plunkett Digitally signed by Kaylie Plunkett Date: 2020.11.05 10:49:29 -09'00' DSR-11/5/2020 RBDMS HEW 11/5/2020 SFD 11/5/2020 VTL 2/24/21 CD5-98 & CD5-98L1 Scale Inhibition Treatment 10/5/20 – 10/6/20 Hybrid Scale Inhibitor Squeeze Job pumped from 1700 hrs on 10/5/20 to 1600 hrs on 10/6/20. LRS = Little Red Services - Initial pressure TBG/IA/OA - 1885/1792/42 - LRS pumped 431 bbls WAW5206/Diesel/M209 preflush at 5.0 bpm, TBG/IA/OA - 448/1618/113 - LRS pumped 431 bbls Seawater and SCW3001 scale inhibitor at 5.0 bpm, TBG/IA/OA - 0/1573/173 - LRS pumped 3398 bbls Dead Crude/M209 overflush at 2.0 – 4.3 bpm, TBG/IA/OA - 490/1600/150 Interval treated: CD5-98: 14362’ – 31468’ MD CD5-98L1: 14182’ – 26825’ MD Tubing: 4.5”, L-80, 14217’ MD, 7451’ TVD Packer: Halliburton TNT Packer, 13935’ MD, 7379’ TVD SSSV: None, no SSSV required. 7 O N O rn O \ N O N U N N C m U 11: 10 U W IO U M ID U IJ U N I� U N I0 U JO _U }a>❑ 7c Q cl U> a>❑ U> CL a�I 3: a>❑ a ✓_+ E rl O rl O col O ro O N U> U U J U J U N D L d m m N N> m m m� N 41 ❑ ❑ ❑ ❑ z 2 E E EX E2 E E� E� Ew Ef 3 3 a J (/J O N LL' C (0 K C N a' C N l6 C N C N C m C In ❑ ❑ 1(l J J J Ifl J N T m- N T m E N y m V N ❑ >, ❑ 0 T ❑ T ❑ >, ❑ >, ❑ C LL > ll> IL> LL LL�- LL— LL j > > > > I> > ON .N N N N y m NUI N N N N m N a J m N y N fn M O In m (n m w. .UI a N LL N a N a N m N U' �I O �I m ofI oou U m �I U m U N �I U N �I U N �I U N ❑ c N N N m 'm z N Z m d ❑d❑ d C)E ❑ w ❑ U ❑ U 0, l0LL I0L IL IL IL I0L Q N0 0 0 g 0 ov 'E .gNm .0 0 0a 04 0Q oQ 0Q 0E E oN OW OoQ cE o o — o . _ o>o c �.E.E.E.E.F mouoUo oNon0 V ON Nro =W N Nc0 �ro =m NN NN ON NN N Y W O W LL Y1 y W O� W rn W rn 1m W rn WOE WOE❑ Wrn Wrn W rn W rn WOE Wrn W rn 0 a U D rn rn rn m rn rn m rn m m m rn m IL a > 0 0 0 0 0 0 0 0 0 0 0 0 0 W L M 1\ In IA IA N Y] N In N IA in IL m m a m m a rn m m m rn m a m rn O W O 0 V 0 J _ _ O U U O Z u N O M O O QO V N rn m rn O y � N N S rn N Q N a N rn N J d N v aa, 0 o GON 0 m o E J 0 N 0 0 � a:z N `Q r U 0 d Z rn J f s Y ' N m_ d 0 0 W J J � Q J O ❑ oC \) U H 01 Q E E Z 0o Z EE U rn 0 m z 0 � m m m m m m m m m m m m 0m 3 m N Yo N N N m m N N N m m N m m m m m m m m m m 75 m aF,.. O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ � > O C7 N a m �0 c0 co �o �o co co �o co �0 i0 co O) Q Z N 0 a R 0 C W a Z M M M M M M M M M M M M M N � O Q a E E — 0 z 0 , o O O m c w0 0:z J 0 O U U U U U U U U U U U U U j Q O J ❑W ❑W ❑W ❑W ❑W a K D J J m PO W W W W W W 7 0 c C C N ^ o pl pl E O p fi Z f/1 vi N 47 E E J J O O J J m m c ❑ of of p �+ p �+ NI 0 NI 0 NI 0 NI 0 w+ E a a W W Z o O o O JI JI ❑ ❑ p p K 3NQC�n 30Z Of J3 NV .Q Z ¢IfI Z ?Vl vQ> NQ I u❑NV F53 p 1 UIS 1 O E U ❑ E U p Z' U p Z U; p Z Uy a Z` > p 1 USU p 1 p STppS a U. U. JmILL E I Qy I I I I Q ISI N I. _ I W a •y UN a 1 U m a l U m I a� 2 ' a NayU p pa'y N K1 Q U w U w U N ��� UN (i U N U N � U m U U I bi �o d ti dZ d Z_ d d�I d d�1Z mSr2 a a LL N N U IL 0 U LLO L G IL L L yO dm .22 0.2 0 NN NL Cn. C V C V N V C N C N CNCdCN E E £ E ESN �JJ _iV E E E E m E n N OJ OD Jm Op W I VJp N OJ Op J O UJ N V J 0 UJ c0 " E O E m O wrn m wrn wrny w�iE wrn wdi turn wm Wrn wrn wrn wm wrn wrn wU wU 0 � � Irn U rn rn rn m rn rn rn rn m rn rn rn rn rn rn d a - o N a N o N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 N W L � rn � m N rn H rn N rn � rn to rn . m � rn H rn � rn N N N N N a rn o, rn m rn W 0 U m U C V J Q a J v a ON a L) _ U o 0 Q rn h ❑ m A a F 2 C � o GM W w � a3 m w J y cn,^ J > ❑ Q Jc OV o Q O E Q Z o E m z m m A m m m m m m m m m m iy m m m m m 3 � p p m m p ❑ m O m p m p m p m ❑ m ❑ m O m p m O m p m p m ❑ '. m m m m m m m m m m m m m m m m '0 c p 0 a a a 0 0 a a a a 0 a 0 '0 a rn N I O O NU U U U U U U U U U U U U U U U U U OQ m ❑ 2 p ❑ ❑ ❑ p p p ❑ ❑ ❑ ❑ 10 p O a a a w w w w w w w w w w w w w w w w V E 0 0 O CD O 0 O o ZO n 3 3 3 3 0 0 3 3 m o U O O O O O O O O W W W W W W W W75 N N r T N N ❑ N ❑ N Cl0 W ❑ W ❑ W ❑ N ❑ U U F F C m o Q Z Z Z Z Z Z Z Z Z Z Z 1 p y� Or U a m rna rnN rna mU rn� as mN rn9 w w O O W W U U J J ❑T❑ T❑ T❑ T❑ T U a T❑ U a U a T❑ U a T❑ U d U d U a U a J J a 2 a Z a 2 a Z d21 d Z a 2 a Z % i J J ILN IL �j IL �j IL fn LLN LLN llN LLy U U N Vi U VI V N 'C U N U N .0 U N _C U N U U V• c, �j E N oa E oa C'W'Wa N oa oa C N oa N oa N oa C V1 mC, (may c m N E G E u E u E u E u E u E 2m u E 0¢ O¢ O y �) N a 0 d p d 0 a p a o a 0 d 0 a o m W m W U .m. in Y N c a w U w U W U W U W U W U w U W U N T N S m =_ ❑ O Q a a w h U m m rn m m m rn m nut m m O' N N N pN N N N N a y O 0 ❑ W - t a N z aI m m m rn m m o� m v m W O C Ot N d V Q J O d N W 6 E E Z U m W d N Q O a7 A y O J ¢ C J a /� li (D O N U U C O c O p a N N O N a O UU E ¢ z /}�\ m Q A N v C � o F Z m mC m K N = ❑ a E m O E N a c V/ >cl J = = O Q O c O � @ c Q E a U 2 In m m m m m m m m m m rn a N ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ m C Q N O f0 D7 D7 m W m p Ot d m m Z � W b O ❑ ❑ ❑ ❑ f5 ❑ 5 ❑ ❑ J E G� W E n O t+� N N t7 M M M M th N U p O F N ? W C = N — 6 E y E Z pn d 2 N G N = O W 1� m w V m o O Obi y Q o o Q o 0 N U U U U U U U U 5 .� .0 U On -'o o n mo d ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ o d w O ° o O Eo m m w w w w w w w w J 3 Z U m 0 0 U K V E d A E 0 U P 0 v a O O O M O O 0 Z N M r U � 6 N 0 yz Q J O U C = N N /F LL N d E5 O CL Q n = a 0 0 W U d 0 C 0 J o, J a� d o = N o 0 0 N N r E E o U y Q � o N U U z 2 m C > o � W �/� V/ J JN JQ y O d q � ° U c 0 Q e n E Q z E o z a 3 N r o o 10 O p r m N r � N C 6 Y E � E d d A E 0 U P 0 v a STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1 a. Well Status: Oil ❑� • Gas❑ SPLUG ❑ Other ❑ Abandoned ❑ Suspended ❑ 20AAC 25.105 20AAC 25.110 GINJ ❑ WINJ ❑ WAGE] WDSPL ❑ No. of Completions: 1 b. Well Class: Development 0 Exploratory ❑ Service ❑ Stratigraphic Test ❑ 2. Operator Name: ConocoPhillips Alaska, Inc. 6. Date Comp., Susp., or Aband.: 8/9/2019 14. Permit to Drill Number/ Sundry: 219-060 - 3. Address: P.O. Box 100360 Anchorage, AK 99510-0360 7. Date Spudded: 7/20/2019 15. API Number: 50-103-20803.60-00 ' 4a. Location of Well (Governmental Section): Surface: 281' FNL, 2402' FEL, Sec 18, T11N, R4E, UM Top of Productive Interval: 247' FNL, 2833' FEL, Sec 12, T11N, RX, UM Total Depth: 3186' FNL, 592' FEL, Sec 19, T11N, R4E, UM 8. Date TO Reached: 7/28/2019 16. Well Name and Number: CRU CD5-98L7 ' 9. Ref Elevations: KB:73.4 - GL: 34 - BF: 17. Field / Pool(s): Collville River Field/Alpine Oil Pool - 10. Plug Back Depth MDrrVD: N/A 18. Property Designation: A$RC-NPR4, ASRC-AA0092344, ASRC-NPR2-ASRC-NPR3 ' 41b. Location of Well (State Base Plane Coordinates, NAD 27): Surface: x- 349576. y- 5965926 Zone- 4 - TPI: x- 344327 y- 5971348 Zone- 4 Total Depth: x- 351254 y- 5957707 Zone- 4 11. Total Depth MDr VD: 29480/7562 • 19. DNR Approval Number: 932669,340757,932128 12. SSSV Depth MD/TVD: N/A 20. Thickness of Permafrost MD/ VD: 1325/1320 ' 5. Directional or Inclination Survey: Yes ❑� - (attached) No ❑ Submit electronic and printed information per 20 AAC 25.050 13. Water Depth, if Offshore: N/A (ft MSL) 21. Re-drill/Lateral Top Window MD11VD: 14120/7429 22. Logs Obtained: List all logs run and, pursuant to AS 31.05.030 and 20 AAC 25.071, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Types of logs to be listed include, but are not limited to: mud log, spontaneous potential, gamma ray, caliper, resistivity, porosity, magnetic resonance, dipmeter, formation tester, temperature, cement evaluation, casing collar locator, jewelry, and perforation record. Acronyms may be used. Attach a separate page if necessary RECEIVE GR/Res SEP 0 9 2019 23. CASING, LINER AND CEMENTING RECORD CASING WT. PER GRADE SETTING DEPTH MD SETTING DEPTH TVD HOLE SIZE CEMENTING RECORD AMOUNT FT. TOP BOTTOM TOP BOTTOM PULLED 20 78.6 H-40 39 119 39 119 142 10 yds 10.75 45.5 L-80 39 2286 39 2177 f13.5 890sx 11.0ppg DeepCrete 7.625 29.7 L-80 37 14362 37 7480 19.875xl1 480sx 15.8ppg Class G 4.5 12.6 L-80 14161 26825 7438 7539 16.5 Slotted Liner 24. Open to production or injection? Yes [2] No ❑ If Yes, list each interval open (MDrrVD of Top and Bottom; Perforation Size and Number; Date Perfd): COMPLETION A E PERF PUPS @: �� 14182-26625 MD and 7539......6/1/2019 E R--�FI ED 25. TUBING RECORD SIZE DEPTH SET (MD) PACKER SET (MD/TVD) 41/2 14217 13935/7379 14159/7538 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. Was hydraulic fracturing used during completion? Yes E] No Q Per 20 AAC 25.283 (i)(2) attach electronic and printed information DEPTH INTERVAL (MD) AMOUNT AND KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production: 9/4/2019 Method of Operation (Flowing, gas lift, etc.): FLOWING MW/GAS LIFT Date of Test: 4/2019 -ongoing Hours Tested: 38 Production for ITest Period Oil -Bbl: 700 Gas -MCF: 684,000 Water -Bbl: 1400 Choke Size: 38 beabs Gas -Oil Ratio: 975 Flow Tubing Press. 900 Casinq Press: 1700 lCalculated 24 -Hour Rate Oil-Bbl:Gas-MCF: 650.000 Water -Bbl: 1 a Oil Gravity - API (torr): 37 Form 10-407 Revised 5/2017 Vn to14111 CONTINUED ON PAGE 2RBpMS '"BSEP t 0 2019 Sub `t O I NIAL only 28. CORE DATA Conventional Core(s): Yes ❑ No 0 • Sidewall Cores: Yes ❑ No 0 , If Yes, list formations and intervals cored (MDfTVD, Fromlro), and summarize lithology and presence of oil, gas or water (submit separate pages with this form, if needed). Submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results per 20 AAC 25.071. 29. GEOLOGIC MARKERS (List all formations and markers encountered): 30. FORMATION TESTS NAME MD TVD Well tested? Yes ❑ No ❑� If yes, list intervals and formations tested, briefly summarizing test results. Permafrost - Top Surface Surface Permafrost - Base 1325 1320 Attach separate pages to this form, 9 needed, and submit detailed test Top of Productive Interval 14115 7428 information, including reports, per 20 AAC 25.071. Formation @ TPI -Alpine C C-30 2478 2321 K-3 6917 3732 Albian 97 7996 3984 Albian 96 9487 4494 HRZ 11210 5168 Kalubik 13091 6926 Kuparuk C 13489 7186 LC/Milureach 13720 7301 13729 7305 TD 29480 7562 Formation at total depth: AI ine C 31. List of Attachments: Daily Operations Summary, Definitive Survey, Cement Report, Schematic Information to be attached includes, but is not limited to: summary of daily operations, wellbore schematic, directional or inclination survey, core analysis, in orwll test results. r 20 AAC 25.070. 32. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Authorized Name: G.L. Alvord Contact Name: Matt Smith Authorized Title: Alaska Drilling Manager Contact Email: Matt.Smith2 co .com Authorized / Contact Phone: 265-6337 Z-ot °L Signature: (, l! /L Date: �let I INSTRUCTIONS General: This form and the required attachments provide a complete and concise record for each well drilled in Alaska. Submit a well schematic diagram with each 10-407 well completion report and 10404 well sundry report when the downhole well design is changed. All laboratory analytical reports regarding samples or tests from a well must be submitted to the AOGCC, no matter when the analyses are conducted. Item 1a: Multiple completion is defined as a well producing from more than one pool with production from each pool completely segregated. Each segregated pool is a completion. Item tb: Well Class - Service wells: Gas Injection, Water Injection, Water-Alternating-Gas Injection, Salt Water Disposal, Water Supply for Injection, Observation, or Other. Item 4b: TPI (Top of Producing Interval). Item 9: The Kelly Bushing, Ground Level, and Base Flange elevations in feet above Mean Sea Level. Use same as reference for depth measurements given in other spaces on this form and in any attachments. Item 15: The API number reported to AOGCC must be 14 digits (ex: 50-029-20123-00.00). Item 19: Report the Division of Oil & Gas / Division of Mining Land and Water: Plan of Operations (LO/Region YY-123), Land Use Permit (LAS 12345), and/or Easement (ADL 123456) number. Item 20: Report measured depth and true vertical thickness of permafrost. Provide MD and TVD for the top and base of permafrost in Box 29. Item 22: Review the reporting requirements of 20 AAC 25.071 and, pursuant to AS 31.05.030, submit all electronic data and printed logs within 90 days of completion, suspension, or abandonment, whichever occurs first. Item 23: Attached supplemental records should show the details of any multiple stage cementing and the location of the cementing tool. Item 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 1, and in item 23 show the producing intervals for only the interval reported in item 26. (Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval). Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, or Other (explain). Item 28: Provide a listing of intervals cored and the corresponding formations, and a brief description in this box. Pursuant to 20 AAC 25.071, submit detailed descriptions, core chips, photographs, and all subsequent laboratory analytical results, including, but not limited to: porosity, permeability, fluid saturation, fluid composition, fluid fluorescence, vitrinite reflectance, geochemical, or paleontology. Item 30: Provide a listing of intervals tested and the corresponding formation, and a brief summary in this box. Submit detailed test and analytical laboratory information required by 20 AAC 25.071. Item 31: Pursuant to 20 AAC 25.070, attach to this form: well schematic diagram, summary of daily well operations, directional or inclination survey, and other tests as required including, but not limited to: core analysis, paleontological report, production or well test results. Form 10-407 Revised 5/2017 Submit ORIGINAL Only CD5 - 98 Alpine A/C Dual Lateral Producer Final Schematic TNT Production Pa at 13,945' MD HP Sliding sleeve for Selectivity 14,000' MD 3-1/2" 9.3# TN110SS 20" 94# H-40 Welded Conductor to 115' MD 10-3/4" 45.5# L-80 TXP x BTC Surface Casing at 2,286' MD 4-'/" x 1" GLM 4-112" 12.6# L-80 Hyd563 4%"x1"GLM 7 518" 29.7# L-80 TXP Intermediate Casing at 14,362' MD 4-%" x 1" GLM Upper Completion: 1) 4 1/2"-12.6# Hyd563 tubing 2) Shallow nipple profile 3.813" ID 3) 4-1/2"x 1" Carrico KBMG GLM (xx') w/DCK2 pinned for 2500 psi casing to tbg shear 4) SLB DHG 5)TNT Packer 6) X Nipple profile, 2.813" 7) TNT Packer 8) XN Nipple profile, 2.813" Lower Completion: 8) Plop and drop liner in C sand - no junction -4.5" 12.6# L-80 w/ perf pups 9) ZXP liner top packer & Flexlock Liner Hanger XO 5" Hydril 521 Box X 4-%" H563 pin -4.5" Hydri1563 12.6# L-80 w/ Frac Ports C sand Lateral 6 1/2" Hole TD 14,134'- 29,480' MD 4 %" 12.6# L-80 Hyd563 Liner w/ perf pups 0 0 0 0 0 0 0 0 4 %" TNT Production Packer A sand Lateral at 6 1/2" Hole TD 14,169' MD ZXP liner top packer 14,341' — 32,468' MD at 14,200' MD ports to CorwomPhillips Alaska. Inc. WNS PROD WELLNAME CD5-98 WELLBORE CD5-98 AST WO: clwae. asm+a 94pn AM Last Tag VervckacnenmEc leceull AnnoWlon pepM MKB1 For Date WeI1Wr0 Lae, MM ey HANGED; XO LAST TAG: CD5.98 jerown .............. Last Rev Reason ................. _......._.......... Annotation, End ptWeIIWre LasIMM By 019Doh Rev Reason: Post Frac Wellwork X2019 claylg ............................................................... Casing Strings Casino Description CONDUCTOR OD(in) ID lint TOP Mx01 0tleephoMKa1 Se, OeptN nVD1... ft"n B... Graee A 1925 39.5 119.5 1194 94.00 H40 Top Th,. CpineDeacN, SURFACE Do ON IDlln) TOPIMKB) SeYDepM IrH,B) Set ppM lP/OL.. ML"11... GrMe ID3/4 988 39.2 2,286.2 2,177.2 45.50 L-80 Tap Ttrrne TXP-M CONDUCTOR 941194 Cape.Oeacrlptlon INTERMEDIATE Do (in) To (In) TOppa(Bi ISIN DePM MKS) Set DapN(Past MLen 11 Grate 7518 6.88 3].3 14,3619 7,4802 2930 L. Top IDrtae TXP-M suRPACE; Oe.x-2-o- Caging patent ASAND LINER ODlln1 ID rn) raP MKEe Is. Depas Mass an, Depth jTVD1... vNLen ll... Graee 4112 3.96 14200.1 31468.0 7,7164 12.60 L-80 Tap Th. IHyd563 Liner Details NIPPLE, 2,4710 Top(mcB) Too (TVD)Mouls Top net mmlMa open Nwnmelto Ms 14,220.1 7,451.8 77.15 RACKOFF "RS" Rackoff Seal Nipple 4,270 GAS LIFT; 5,3147 14,222.2 74522 77.11 HANGER "DG Flex -Lock Liner Hanger 4.620 14,229.3 74538 77.1 XO, 55 H553P x 5 HUIB 3.920 REDUCING GAs uFr;ly4Ta, 14,8232 ],518.9 8.3 FRACSLEEVE Baker ac seeve# ,Hytl563 2645 2.645" OD Ball 15,5518 7522.8 81 FRACSLEEVE Sake acsleeve O, Hyd 2.595 2,9". 595" OD Bell 16441.9 7,5233 06 FRACSLEEVE Baer acsleeve#19.Hyd563 2515 2.515' OD Ball Gas DVT', 1SINIX 17,249.9 7,532.1 8690 FRAC SLEEVE aker acsleeve#18, ytl 3 2495" OD Ball 2.495 -' 9 ],5355 90.68 FRACSLEEVE er csleeve plJ, Hytl563 455 W11."EURNIPSENSOR: ---1 2455" OD Ball +Aetna T6-655 ],556.3 86.68 FRACSLEEVE U.Malt.rdernessISHY663 2415 PACKER; 139347 2415 OD Ball 19,3934 7,93.9 8905 FRACSLEEVE B.N.1foacSienevES15, Hyv563 2.375 2375" OD Bali EUDWG SLEEVE: I.J.4 20.203.2 7,5M 89.58 FRACSLEEVE Baker larsheave.X4. hyd563 2335 2.335' OD Ball 21,0132 7.5800 90.11 FRACSLEEVE Baker ft=sleeve #13, Hyd563 2.295 2295" OD Ball xl%+1E: P.011`31,8162 7598.4 89,81 FRACSLEEVE Baker fins,sleeve #12. Hyd563 2255 1255" OD Ball 27621.7 7,595.8 90.04 FRACSLEEVEaer acsleeve#11,Hyd5 2215 2215' OD Ball PACKER; 14.1591 3,46) 7,602.6 89.31 FRAC SLE VE a r acsleeve #10, Hy DS 2.1)5" ODS, NIPPLE; Wake 24.075T 7,613.3 88.82 FRACSLEEVE Base.sleeve#9, Hytl563 2.15 Lo..R. le Mr. 2.135' GO Ball MOLE ..RE, 1eM71 25, 41. 7,6274 89.01 FRACSLEEVE .7 raz sleeve #8, Hytl563 " Dept ---2"W5 25,725.6 7,6390 Islas.FRACSLEEVE Baker Mae sleeve #7, Hyd563 2.55 2055" OD Ball 26,5.5 7,6540 86.32 FRAC SLEEVE Baker few sleeve #, Hytl56 .15 2.015 OD Ball wTERMEOIATE, 31.8+4sMe 27747 ],99.8 8863 FRACSLEEVE a r Tac sleeve N5, Hytl563 1. 75 1.9)5.OD Ball 28,156'S ),689.9 8975 FRAC SLEEV aer csleeve#4, Hytl 19M 1.935' OD Ball 28,962.5 7,694.8 8934 FRAC SLEEVE #3,Hyd563 1895 OaD B 11 29,768.3 7,704.1 8950 FRACSLEEVEaer Tart sleeve#2, 11'0563.855 185 OD Ball X 572 6 77114 89.51 FRACSLEEVEer csleeve#1, Hyd993 1.815 1.815" ODD, Tubing Strings Tubing Descripion String TUBING PROD 4112 Me...IDlm1 T.p'MEel set Depth (n.. Ott Dept n lND1 l...vn Mdn) Jere ee rapeonneexpn 3.96 35.0 14,2166 ),4510 12.60 L-80 Hytl563 Completion Details TRPPVD) Top MKS) MIKEN ha N21 PI IMm Dee Com Nominal ID On) 350 35.0 000 HANGER FMC 4-112" Tubing Hanger Hydnl HYD 563 3958 2,4710 2315-7 43.77 NIPPLE NIPPLE,IANDIN ,4 la -,W.787 H563 181 13,9109 7.371.7 71.39 AUGE7 PUMP SLB Solid Gauge Malrcleal w/ 11mm encapsulated I wire, 11563 3.884 SENSOR 1 2 7,3787 7203 XO-REDUCIN XO PUP, 41011ydnl 563 x3-117'8563 pin 2992 1 7 ),339.1 7207.PACKER Halliburton TNT Packer, -11T 11563 2SOD 13,90 .4 73966 73.53091 -N7 -SLEEVE SLIDING, 3-11 ' AP - LB, X Profile, Up 2.813 SLEEVE t0 open 14,On1 7418.9 75. NIPPLE NIPPLE ,IANDING,312",X,2.813",Hydn1563-High Burst .13 14,159.1 ),438.3 A.18 PACKER Halliburton TNT Packer, 312" H58 2.900 14,176.5 ],4422 77.37 NIPPLE NIPPLE,IANDING.312',XN, 281 ",EUE 80 2750 14,198.8 ],4186 JZ27 LOCATOR Baker Me emcal ocabq EUE rd M1ear screws 'below 3000 b a or) 14,19].7 7,44.8 77.26 MULE SHOE Baker VJLEG 2,980 A Rise LINER, tope I m.awo wNs PROD WELLNAME CDS-98 WELLBORE CD5-98 ConocoPhillips AIH.�� II1� F- I E:::] c0s3a. s.vm+3.aao z3AM Mandrel Inserts wma a<nam,m PotiM1 n w R:%O .............................. __........ on Tap11V0) M TOPIRKBI Otl(B) Make MaMI ODllnl 3ery ypq TyW Tp Type PoILSIxe Ilnl TRO Run (M1) Run Oap5,314] 3,41D Gamm KBMG 1GAS LIFT GLV BK 0.188............... .............114761 5,4160 Gamm KBMG 1 GAS LIFT GLV BK 0.1813,8449 7349.5 Camco KBMG 1 GAS LIFT OV BK U."Notes: General & Safety Annoblion tt NOTE'. VieWScllemaiicw/AlaskaSchema1ic100 0.1184ZVM.]��1,411H G LIFT: 5.3L] GIS LET. 11.48 .1 Gab LIFT:IRSM.B GLUGE PUMPSENSOR: 1Z.OH ngC EE: +%.1 SLIOIW SIEEVE: 13.91M.4 NIPPIE: 14.073 Pg MR: I4,IW.1 NIPPIE: 10.18.E LOCATOR: 14,1WB MULE$H0E: 1418].] INTERMEDIATE', W,314W+9 A SAND LINER: I41M 1- 31..O ___wry, WNS PROD WELLNAME CDS-98 WELLBORE CD5-98L1 ConocoPhillip$ Well Attribul Max Angle e l TD^^^ Freta Name WeOan gpVUW1 W¢IIMne 91aNs ncl^^) MO'. A[(Bim lXNe) Al8$kd IUC. ALPINF ECIDT9ni'mT Donn u CO66BL1,&VAfB8i0'.RAM Last Tag VxYWVJuaNN:tamal AnnoMon Nil EM Oad Wellpon Las ttMM 81 WWCPRE00 LAST TAC' CDS98Lt jennall .........................._._............. ......._ Last Rev Reason Annimation Ene Oah Wcnlnre umtml .............................................................. .......... _. Rev Rea50n: IATERAL 9/5/2019 CD5-98L1 ennalt Casing Strings Gsin9 Des[npTE (in) C SAND PO,TED LINER 412 IO tin) 3.96 Top tNNB) Sel Oep011flNB) Sel Cepin tNOj... WVLen tI.. Glabe 14,1014 26,825.0 J,5389 12.60 L-80 Top TN,eab H563 ::j Liner Details CONOUCTOR'E41t9A Top INN81 Tani tNNB) Top 110 Il Orc Com Nominal l0 (in) 14,1514 7.4386 A.16 ETTIN HRDE Liner Setting Sleeve 5" x TL -80 4.200 9VRPACe3B.T0.202 SLEEVE 14,1]].1 1,4420 11.9p X0,5" H527.4.5"H5fi3 pm pin 3.958 NIPPLE; 2x10 I jX0 REDUCING Notes: General & Safety OA9 urr. 5.93<1 End D. Annotation 9/512019 NOTE: Vi WSChematiCW/Alaska Schematic10.0 3AS UFT; n,M 1 G93 Ul 198N.p OA VPUMPMNSOR; 19.9109 PACKER: 13Wa.7 9DUWG &&EMIL 13,%0.4 N11iii 1407)3 INTERMEDIATE: V 310.3019 o -u C 6AND PORTEp LINER; 10.161.0.]6,0150 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (ftKB) End Depth (KKB) 6/4/2019 6/4/2019 1.00 MIRU MOVE RURD P Mobilize rig to CD5-98. 0.0 0.0 12:00 13:00 6/4/2019 614/2019 1.50 MIRU MOVE RURD P Scope Derrick down. 0.0 13:00 14:30 SIMOPS: Disconnect air, water, steam interconnects. 6/4/2019 6/4/2019 1.00 MIRU MOVE RURD P Lower Cattle Chute on Rear Pipe 0.0 0.0 14:30 15:30 Shed Roof. SIMOPS: unbridle traveling blocks, pin top drive, continue disconnection of interconnects. 6/4/2019 6/4/2019 1.00 MIRU MOVE RURD P Secure traveling blocks and energy 0.0 0.0 15:30 16:30 track, continue disconnecting interconnects. Swap to cold start power. Disconnect electrical interconnects. 6/4/2019 6/4/2019 1.00 MIRU MOVE MOB P Prep to Skid rig floor. 0.0 0.0 16:30 17:30 SIMOPS: Stomp pump module away from pits module. 6/4/2019 6/4/2019 2.00 MIRU MOVE MOB P Skid rig floor to move position. 0.0 0.0 17:30 19:30 1 1 1SIMOPS: Move pits complex. 614/2019 6/4/2019 3.50 MIRU MOVE MOB P Lower Derrick. 0.0 0.0 19:30 23:00 SIMOPS: Move Casing shed; change out tire on pits complex. 6/412019 6/5/2019 1.00 MIRU MOVE MOB P Separate Pipe Shed module from sub. 0.0 0.0 23:00 00:00 SIMOPS: Continue Change of tire on pits complex. 6/5/2019 6/5/2019 2.50 MIRU MOVE MOB P Continue to stomp pipe shed away 0.0 0.0 00:00 02:30 from Sub. SIMOPS: Complete tire change on pits complex. 6/512019 615/2019 2.50 MIRU MOVE MOB P Hook up Sow to Pipe shed and 0.0 0.0 02:30 05:00 mobilize away from Sub. Stomp Sub off Of CD5-24. SIMOPS: move rig mats for use in moving Sub on pad for upcoming movement. 6/5/2019 6/5/2019 1.00 MIRU MOVE MOB P Hook up Sows to Sub and start pulling 0.0 0.0 0500 06:00 sub onto and down CD5 pad. 6/5/2019 6/5/2019 3.00 MIRU MOVE MOB P Spot sub and unhook Sow and Jeep. 0.0 0.0 06:00 09:00 Stomp Sub over CDS-98. Level and Shim Sub module. SIMOPS: Stage Pit module near Sub module. 6/5/2019 6/5/2019 2.00 MIRU MOVE MOB P Set Rig mats for pipe shed module 0.0 0.0 09:00 11:00 spot. SIMOPS: Spot Pump module near pits module. 615/2019 6/5/2019 1.00 MIRU MOVE MOB P Spot pipe shed module near Sub with 0.0 0.0 11:00 12:00 Sow. 615/2019 6/5/2019 0.25 MIRU MOVE MOB P Unhook and release Sow form Pipe 0.0 0.0 12:00 12:15 Shed module once spotted. 615/2019 6/5/2019 3.00 MIRU MOVE MOB P Stomp Pipe Shed to Sub, spot, shim 0.0 0.0 12:15 15:15 and pin module. 615/2019 6/5/2019 1.00 MIRU MOVE MOB P Raise Derrick (w/ PJSM), retract and 0.0 0.0 15:15 16:15 store raising rams. SIMOPS: Spot motor complex near pump module with Sow. 6/5/2019 6/5/2019 0.75 MIRU MOVE MOB P Skid Rig Floor to drilling position. 0.0 0.0 16:15 17:00 SIMOPS: Spot rasing shed near pipe shed with Sow. 6/5/2019 6/5/2019 2.00 MIRU MOVE MOB P Spot casing shed into place with 0.0 0.0 17:00 19:00 stompers. Spot Pit module into place with stompers. Page 1/58 ReportPrinted: 8/1212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log sten Depth Start Time End Time Dv(hr) Phase Op Co. Ac" Code Time P -T -X Operation (flKB) End Depih(WO) 6/5/2019 615/2019 1.50 MIRU MOVE MOB P Spot Pumps module next to Pits 0.0 0.0 19:00 20:30 module with stompers. 6/5/2019 6/5/2019 1.50 MIRU MOVE MOB P Spot Motors module next to Pumps 0.0 0.0 20:30 22:00 module with stompers. 6/5/2019 6/6/2019 2.00 MIRU MOVE RURD P Raise Cattle Chute. 0.0 0.0 2200 00:00 SIMOPS: switch to 3516 Cat power. 6/6/2019 6/6/2019 2.50 MIRU MOVE RURD P Unpin Top Drive, Inspect Derrick, Rig 0.0 0.0 00:00 02:30 Up and Scope Up Derrick, Connect Kelly Hose on Rig Floor, Disconnect Scoping Lines. 6/6/2019 6/6/2019 3.50 MIRU MOVE RURD P Lower Down Cellar and install flooring. 0.0 0.0 02:30 05:00 Work on Interconnect Hoses, stairways, post well sign and other signage, trim Herculite, Centrifugal Pumps, Handrails, Water, Steam, Air to all modules. Function Test Pipe Shed equipment. Drain Lines to BOP deck. Work on Rig Acceptance Checklist. RIG ACCEPTED: 06:00 6/6/2019 6/6/2019 2.00 MIRU MOVE RURD P Change Out Saver Sub, Die Blocks 0.0 0.0 06:00 08:00 and Bell guide to 4.51F (w/PJSM). SIMOPS: Test Eddie Pump and Lines to Ball Mill. 6/6/2019 6/6/2019 4.00 MIRU MOVE RURD P Remove Knife Valve and Pup from 0.0 0.0 08:00 12:00 Diverter Tee, install blanking Flange. NU Diverter Tee, 17.5" Riser and Surface Bag. SIMOPS: Onload 9.6ppg DrillPlex Spud Mud to pits. 6/6/2019 6/6/2019 5.00 MIRU MOVE NUND P NU Surface stack. Torque all bolts on 0.0 0.0 12:00 17:00 Diverter Tee, Riser, Bag. Move Flow Box into position and seal. Install Riser, MU Flow line, Jet lines, Hole Fill line. SIMOPS Continue loading 9.6ppg DrillPlex Spud Mud to pits. 6/6/2019 6/6/2019 2.00 MIRU MOVE SLPC P Slip and Cut 141'(18 wraps) of drilling 0.0 0.0 17:00 19:00 line. Calibrate blocks, check Crown -0 - Matic, lop drive inspection post saver sub change out. 6/6/2019 6/6/2019 1.50 MIRU MOVE RURD P Clean, Repair and Install PVC Low 0.0 0.0 19:00 20:30 Pressure Riser. Air up all boots and calibrate TOTCO and Flow Paddle. SIMOPS: Check SLB Standpipe Transducer. 6/6/2019 6/62019 2.75 MIRU MOVE PULD P PU NMDC, Jars and 5" HWDP. Build 0.0 0.0 20:30 23:15 Stands and rack back in Derrick. 6/6/2019 6/6/2019 0.50 MIRU MOVE RURD P Flood All surface mud lines and 0.0 0.0 23:15 23:45 Pressure test HP Mud Lines from Mud Pumps to Top Drive, 500 psi / 3500 psi. Test Jet Line and Flow Paddle. Fill Hole: 52 bbls. 6/6/2019 6/7/2019 0.25 MIRU MOVE SFTY P Pre Spud Meeting for well and PJSM 0.0 0.0 23:45 00:00 for PU BHA#1 (Surface interval BHA). 6/7/2019 6/7/2019 0.50 MIRU MOVE SFTY P Continue Pre -Spud meeting and 0.0 0.0 00:00 00:30 PJSM on PU of BHA#1 for Surface Interval. 6/712019 6/7/2019 3.00 MIRU MOVE BHAH P PU BHA#1 for surface interval per 0.0 0.0 00:30 03:30 SLB and Gyro Representatives. 6/72019 6/7/2019 0.50 SURFAC DRILL DDRL P RIH,Shallow Hole Test of BHA. 0.0 120.0 03:30 04:00 Contact bottom at 120' MD. Page 2158 Report Printed: 811212019 a Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan oepN Stan Time End Time Our (m) Phase Op Code Activity Cone Time P -T -X Operation (WB) End DBPN (ftKB) 6/7/2019 6/7/2019 2.00 SURFAC DRILL DDRL P Drill 13.5" hole from 120'MD to 120.0 281.0 04:00 06:00 281'MD, 281' TVD, 550 GPM, 850 PSI, 50 RPM, 2k TQ, 2-4k WOB; off bottom = 750 PSI, PU = 62k, SO = 62k, ROT = 60k, TQ = 5k. AST = 0, ART = 1.04, ADT = 1.04, Total Bit Hours = 1.04, Total Jars = 129.62. 6/7/2019 6/7/2019 6.00 SURFAC DRILL DDRL P Drill 13.5" hole from 281'MD to 281.0 793.0 06:00 12:00 793'MD, 793' TVD, 500 GPM, 1040 PSI, 60 RPM, 3k TQ, 5-25k WOB; off bottom = 900 PSI, PU = 80k, SO = 89k, ROT = 88k, TQ = 1 k. AST = 0.71, ART = 2.59, ADT = 3.3, Total Bit Hours = 4.34, Total Jars = 130.44. 6/7/2019 6/7/2019 5.50 SURFAC DRILL DDRL P Drill 13.5" hole from 793'MD to 793.0 1,319.0 12:00 1730 1319'MD, 1312' TVD, 500 GPM, 1120 PSI, 85% NO, 60 RPM, 5-6k TO, 8- 1Ok WOB; off bottom = 1020 PSI, PU = 96k, SO = 96k, ROT = 96k, TQ = 2k. AST =1.12, ART = 1.84, ADT = 2.96, Total Bit Hours = 7.3, Total Jars = 133.4. 6/7/2019 6/7/2019 0.50 SURFAC DRILL SVRG P Service Rig. Rig Inspections. Change 1,319.0 1,319.0 17:30 18:00 out hose in Ball Mill. Work on Mud Pumps. 6/7/2019 6/7/2019 1.50 SURFAC DRILL RGRP T Troubleshoot Amphion System for Rig 1,319.0 1,319.0 18:00 19:30 Pump problem. Reboot of Amphion System brought Rig Pumps back on line. SIMOPS: Replace hose in Ball Mill. C/O Packing on charge pump. 6/7/2019 6/8/2019 4.50 SURFAC DRILL DDRL P Drill 13.5" hole from 1319'MD to 1,319.0 1,699.0 19:30 00:00 1699'MD, 1676' TVD, 600 GPM, 1550 PSI, 49% F/0, 60 RPM, 3-4k TO, 5-8k WOB; PU = 100k, SO = 105k, ROT = 94k, TQ = 4k. AST = 0.39, ART = 1.74, ADT = 2.13, Total Bit Hours = 9.43, Total Jars = 135.53. 6/8/2019 6/8/2019 1.50 SURFAC DRILL DDRL Drill 13.5" hole from 1699'MD to 1,699.0 1,795.0 00:00 01:30 1795'MD, 1765' TVD, 600 GPM, 1550 PSI, 49% FlO, 60 RPM, 34k TQ, 7-8k WOB; off bottom = 1361 PSI, PU = 100k, SO = 105k, ROT= 104k, TQ = 1.5k. AST =1.12, ART = 1.84, ADT = 2.96, Total Bit Hours = 7.3, Total Jars = 133.4. 6/8/2019 618/2019 0.50 SURFAC DRILL SVRG P Service Rig. Lubricate/Service Top 1,795.0 1,795.0 01:30 02:00 1 1 Drive. Work on Amphion System. 6/8/2019 6/8/2019 2.00 SURFAC DRILL RGRP T Troubleshoot Amphion System for Rig 1,795.0 1,795.0 02:00 04:00 Pump problem. Reboot of Amphion System multiple times, Rig Pumps back on line. 618/2019 6/8/2019 2.00 SURFAC DRILL DDRL P Drill 13.5" hole from 1796MD to 1,795.0 1,883.0 04:00 06:00 1883'MD, 1844' TVD, 610 GPM, 1587 PSI, 49% F/O, 60 RPM, 3-5k TQ, 15k WOB; off bottom = 1300 PSI, PU = 108k, SO = 106k, ROT = 106k, TQ = 1.5k. AST =1.23, ART = 1.16, ADT = 2.39, Total Bit Hours = 11.82, Total Jars = 137.92. Page 3158 Report Printed: 8112/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log sten Depth Stan Time End nme Our (hr) Phase Op code Activity Code Time P-T-X Operation (ftKB) End DepN mKB) 6/8/2019 6/8/2019 5.50 SURFAC DRILL DDRL P Drill 13.5" hole from 1883'MD to 1,883.0 2,296.0 06:00 11:30 2296'MD, 2184' TVD, 780 GPM, 2375 PSI, 49% F/O, 60 RPM, 4-6k TO, 12- 22k WOB; off bottom = 2130 PSI, PU = 111k, SO= 110k, ROT= 110k, TQ = 2.5k. AST =1.07, ART = 2.38, ADT = 3.45, Total Bit Hours = 15.27, Total Jars = 141.37. 6/8/2019 6/8/2019 0.50 SURFAC CASING CIRC P Pump 40bbl bit balling sweep; 2,296.0 2,218.0 11:30 12:00 Circulate @ 795 GPM, 2220 PSI, 60 RPM, 2-3k TQ. Rack back 1 stand while pumping bit balling sweep during BU from 2296' MD to 2218' MD. 6/8/2019 6/8/2019 1.00 SURFAC CASING CIRC P Circulate @ 795 GPM, 2160 PSI, 60 2,218.0 1,985.0 12:00 13:00 RPM, 2-3k TQ. Rack Back 1 stand per BU from 2218' MD to1985' MD; 15,640 strokes total. 6/8/2019 6/8/2019 0.50 SURFAC CASING OWFF P Observe Well for Flow for 30 min 1,985.0 1,985.0 13:00 13:30 (STATIC); 5 rpm, 2-3k TO; Blow Down Top Drive. 6/8/2019 6/8/2019 1.50 SURFAC CASING TRIP P POOH from 1985' MD to 850' MD 1,985.0 850.0 13:30 15:00 racking back stands of 5" DP in derrick. UW 90k, DW 90k. 6/8/2019 6/8/2019 0.50 SURFAC CASING OWFF P Observe Well for Flow (STATIC). 850.0 850.0 15:00 15:30 PJSM for laying Down BHA. 6/8/2019 6/8/2019 3.50 SURFAC CASING BHAH P Rack Back all HWDP stands. Lay 850.0 0.0 15:30 19:00 Down BHA per SLB DD Rep. 6/8/2019 6/8/2019 0.75 SURFAC CASING CLEN P Clean and Clear Rig Floor. 0.0 0.0 19:00 19:45 6/8/2019 6/8/2019 1.75 SURFAC CASING RURD P Rig Up to Run 10-3/4" Surface Casing, 0.0 0.0 19:45 21:30 Drain Stack, MU Pup to Landing Joint. Dummy run Surface Hanger. 6/8/2019 6/8/2019 0.25 SURFAC CASING SFTY P PJSM Run Surface Casing. 0.0 0.0 21:30 21:45 6/8/2019 6/9/2019 2.25 SURFAC CASING PUTB P MU Shoe Track with Baker Lock. TO 0.0 280.0 21:45 00:00 connections to 23k. Check Boats (GOOD). Continue Casing run of 10- 3/4" Casing to 280' MD fill every joint. 6/9/2019 6/9/2019 7.00 SURFAC CASING PUTB P Continue Pick Up 10-3/4" Casing from 280.0 1,510.0 00:00 07:00 280' MD to 1510' MD, fill every joint and top off every 10. 6/9/2019 6/9/2019 0.75 SURFAC CASING CIRC P Circulate BU staging up pumps. ICR 1,510.0 1,510.0 07:00 07:45 2 bpm, 160 psi, PVT 131 BBLs, F/O 57%. 2.5 bpm, 150 psi, PVT 131 BBLs, F/O 40%. 3 bpm, 140 psi, PVT 131 BBLs, F/O 40%. DW: 89k. 3.5 bpm, 146 psi, PVT 130 BBLs, F/O 56%. DW: 87k. 4 bpm, 170 psi, PVT 127 BBLs, F/O 56%. DW: 84k. 4.5 bpm, 189 psi, PVT 130 BBLs, Flo 34%. DW: 88k. 5 bpm, 209 psi, PVT 131 BBLs, F/O 33%. DW: 87k. 5.5 bpm, 231 psi, PVT 131 BBLs, F/O 31%. DW: 86k. FCR 6 BPM, 251 psi, PVT 131 BBLs, F/O 34%. UW: 97k DW: 85k. 165 BBLs pumped. 6/9/2019 6/9/2019 2.25 SURFAC CASING PUTS P Continue Pick Up 10-3/4" Casing from 1,510.0 2,244.0 07:45 10:00 1 I 1510' MD to 2244' MD, fill every joint and top off every 10. 6/9/2019 6/9/2019 1.00 SURFAC CASING PUTB P MU FMC 10-3/4" Casing Hanger and 2,244.0 2,286.0 10:00 11:00 Landing joint as per FMC Rep. Wash 1 to bottom, UW = 120k, DW = 107k, Land Hanger @ 2,286' MD. Page 4/58 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log somt Depth Stan Tene End Time our (hr) Phase op Code Aaiviry Code Time P -T -X Operation (AKS) End Depth (RKB) 6/9/2019 6/9/2019 1.00 SURFAC CEMENT CIRC P Circulate and condition mud staging 2,286.0 2,286.0 11:00 12:00 up to 8 bpm, 130 psi. UW 126k, DW 123k 6/9/2019 6/9/2019 2.00 SURFAC CEMENT CIRC P Circulate Reciprocate Pipe while 2,286.0 2,286.0 12:00 14:00 conditioning mud @ 8 bpm, 285 psi, UW 133k, DW 125k. SIMOPS: Blow Down Top Drive and Rig Up Cement Lines. PJSM Surface Cement Job. 6/9/2019 6/912019 4.00 SURFAC CEMENT CMNT P Cement Surface Casing per SLB 2,286.0 2,286.0 14:00 18:00 Cementing Schedule. PT Lines 1500 psi / 3500 psi. Pump 75 BBLs 10.5 ppg Mud Push, 4.7 bpm @ 72 psi; Drop Bottom Plug; Pump 302.6 BBLs Lead Cement, 4.1 bpm @ 140 psi; Pump 60.2 BBLs 15.8 ppg Tail Cement, 1.8 bpm @ 126 psi; Drop Top Plug; Pump 20 BBLs Fresh Water; Chase with Rig Pumps with 194.2 BBLs 10.0# DrillPlex Mud, 1929 strokes 8 bpm @841 psi; Slow to 3 bpm 500 psi; Bump Plug; Hold 1000 psi for 5 min; check floats (Holding). Cement in Place 17:28 6/912019 6/10/2019 6.00 SURFAC CEMENT WOC P Flush Bag and Surface Riser w/ Black 2,286.0 2,286.0 1800 00.00 Water, Flush and Clean out Flow Line, Shaker, Mud Trough, Cuttings Pit, clean cellar box. MU 160 psi gauge to surface stack, refill stack and shut in bag at 19:15. Stack Drained due to need to change out Conductor Valve, Riser Filled and shut back in at 20:00. Begin Monitoring Pressure. No Pressure seen through 23:59. Clean DEMCO Cement Line Valves, BWM on BOP Equipment. 6/10/2019 6/10/2019 6.00 SURFAC CEMENT WOC P Continue Wait on Cement to cure. C/O 2,286.0 2,286.0 00:00 06:00 gauge to 160 psi, initial indication 10 psi. No Pressure increase observed at 06:00. SIMOPS: Continue to Clean Pits; Set Wellhead in Cellar; Remove Starting Head from BOP deck; Pull Mousehole and Shrewhole; PM on tuggers, Drawworks, Top Drive, Mud Pumps. 6/10/2019 6/10/2019 5.50 SURFAC CEMENT WOC P Continue Wait on Cement to cure. 2,286.0 2,286.5- 06:00 11:30 SIMOPS: Clean Mud Pits; Change Out Valves and Seats on Pump #2; Turn HCR Valves 180 degrees; Make Up 12.6' High Pressure Riser to DSA and Adapter Spool; Weld Bracing on Cellar Landing; Continue to work on MP2 Work orders on Draw Works, Iron Roughneck and Pipe Shed. 6/10/2019 6/10/2019 0.50 SURFAC CEMENT PULD P PJSM; Open Annular Preventer, Drain 2,286.0 0.0 11:30 12:00 Stack. Per FMC Rep: Back Out Landing Joint, Lay Down same. 6/10/2019 6/10/2019 0.50 SURFAC CEMENT RURD P PJSM; Rig Down Volant CRT, 0.0 0.0 12:00 12:30 Elevators and Bail Extensions. 6/10/2019 6/10/2019 2.25 SURFAC CEMENT NUND P ND Surface Bag. Pull Flow Riser, 0.0 0.0 12:30 14:45 Stand Back Surface Bag, break and remove bolls on 17.5" Riser, Diverter Tee and Starting head, LD same. SIMOPS: Clean and clear Rig floor of all running equipment. Page 5/58 Report Printed: 8112/2019 -, Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth Start Time Entl Time Our (hr) Phase Op Code Activity Code Time P -T -X Dpera6on (fIKB) End DWM(ftKB) 6/10/2019 6/10/2019 1.00 SURFAC WHDBOP NUND P MU, RIH and set 10-3/4" Water Cap 0.0 0.0 14:45 15:45 on Surface Hanger. Test Seals to 300 psi for 5 min (witnessed and failed). Top Seal held 100 psi, bottom seal held no pressure. Pull and RD Water Cap. 6/10/2019 6/10/2019 1.00 SURFAC WHDBOP NUND P Per FMC Rep: NU well Head and test 0.0 0.0 15:45 16:45 seals 07000 psi 10 min (witnessed). 6/10/2019 6/10/2019 1.25 SURFAC WHDBOP NUND P NU Adapter, DSA, 3' Spool, 12.5' HP 0.0 0.0 16:45 18:00 Riser, BOP Stack. Move Joes Box into Drilling Position. 6/10/2019 6/102019 5.50 SURFAC WHDBOP RURD P Torque HP DSA, Riser, BOP Slack; 0.0 0.0 18:00 23:30 RU Choke and Kill hoses; Install Flow Line. Set Test Plug. Install MPD Test plug, Chink Joes Box, Set Mousehole and Shrewhole. RU Test hoses. MU Floor Dart Valve. 6/10/2019 6/11/2019 0.50 SURFAC WHDBOP RURD P Prime Mud Pumps. Fill Stack. 0.0 0.0 23:30 00:00 6/11/2019 6/11/2019 2.00 SURFAC WHDBOP PRTS P Test MPD as directed @ 300 gpm, 0.0 0.0 00:00 02:00 @150 gpm. Install Trip Nipple. 6/11/2019 6/1112019 0.50 SURFAC WHDBOP NUND P Fill Stack and Choke Manifold. Shell 0.0 0.0 02:00 02:30 lest (GOOD). 6/11/2019 6111/2019 3.50 SURFAC WHDBOP BOPE P Test BOPE, all Tests 250 psi 13500 0.0 0.0 02:30 06:00 psi, 5 min each. Super Choke and manual tested to 1500 psi. All tests Charted. 5" test Joint, 2-7/8" VBRs Upper Cavity and Lower Cavity, Choke Valves 1-15, Manual and Super Choke, Choke and Kill Manuals and HCRs, 4" Valve on Kill Line, 5" TIW, 5" Dart, Upper and Lower IBOP. (ALL PASS) Witness Waived by AOGCC Representative Lou Laubenstein. 6/11/2019 6/11/2019 0.50 SURFAC WHDBOP RURD P Blow Down and Rig Down all test 0.0 0.0 06:00 06:30 Equipment. (PJSM held) 6/11/2019 6111/2019 0.50 SURFAC WHDBOP MPSP P Pull Test Plug and set Wear Ring per 0.0 0.0 06:30 07:00 FMC Rep. 6/11/2019 6111/2019 0.50 SURFAC DRILLOUT RURD P Stage UnderReamer on Rig Floor. Rig 0.0 0.0 07:00 07:30 Up Exceed Tongs. SIMOPS: PJSM: PU BHA 6/11/2019 6/112019 2.75 SURFAC DRILLOUT BHAH P PU Intermediate Interval BHA per SLB 0.0 675.0 07:30 10:15 Rep to 675' MD. UW 75k; DW 83k. 6/11/2019 6/11/2019 0.75 SURFAC DRILLOUT TRIP P RIH from 675' MD to 1905' MD with 5" 675.0 1,905.0 10:15 11:00 DP stands out of Derrick. Pick Up joints of 5"DP from Pipe Shed from 1905' MD to 1990' MD. UW 105k, DW 103k. 6/112019 6/1112019 0.50 SURFAC DRILLOUT CIRC P Shallow Hole Test MWD @675 gpm, 1,990.0 1,990.0 11:00 11:30 1446 psi while circulating Bottoms Up. 6/11/2019 6/1112019 0.50 SURFAC DRILLOUT RURD P Blow Down Top Drive, Rig Up to test 1,990.0 1,990.0 11:30 12:00 10.75" Casing to 3500 psi for 30 min (Charted) 6/11/2019 6/112019 0.50 SURFAC DRILLOUT PRTS P Pressure test 10-3/4" Surface Casing 1,990.0 1,990.0 12:00 12:30 to 3500 psi for 30 min. (Charted, PASS) 6/11/2019 6/11/2019 0.25 SURFAC DRILLOUT RURD P Blow Down and Rig Down Test 1,990.0 1,990.0 12:30 12:45 Equipment. 6111/2019 6/11/2019 1.25 SURFAC DRILLOUT COCF P RIH from 1990' MD to 2080' MD with 1,990.0 2,080.0 12:45 14:00 pipe form Pipe Shed, Wash Down at 84 gpm to Cement Stringer at 2146' MD. Wash and Ream down to Cement Plug @ 2183' MD, 136 gpm, 120 psi, 30 rpm, 3-4k TQ. Page 6158 Report Printed: SI12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log rt sfad Depth start Time End Time Our (hr) Phase O Coda Op viy Activity Code Time P-T- X Operetlon KB) End Depth (fiKB) 6/1112019 6/11/2019 5.00 SURFAC DRILLOUT DRLG P Drill Cement Plugs, Float Collar, Shoe 2,080.0 2,318.0 14:00 19:00 Track, Float Shoe and Rat Hole to 2318' MD, 400-668 gpm, 710-1420 psi, 30-80 rpm, 4-1 Ok TO, 31 % FO, 3- 25k WOB. SIMOPS: Displace well to 9.6 LSND once past Float Shoe. 6/11/2019 6/11/2019 0.50 SURFAC DRILLOUT RURD P Rig Up equipment for FIT Test, 2,318.0 2,274.0 19:00 19:30 continue to circulate for even 9.5 ppg -SND mud in/out. 6/11/2019 6/11/2019 1.00 SURFAC DRILLOUT FIT P FIT test, 27 strokes to 1040 psi, Shut- 2,274.0 2,274.0 19:30 2030 In pressure form 1040 to 900 psi in 10 min. (Charted, 18.7 ppg FIT) 2.7 bbls pumped, 2.5 bola returned. 6/11/2019 6/11/2019 1.50 INTRMI DRILL DDRL P Drill 9-7/8" Intermediate hole from 2,274.0 2,420.0 20:30 22:00 2318' MD to 2420' MD, 2250' TVD, 700 gpm, 1350 psi, 36% FO, 80 rpm, 5k To, 10k WOB, ECD 10.35 ppg, PU 106k, SO 104k, 2-3k TO. SPRs @ 21:40: @2368' MD, 2230' TVD, MW = 9.6 ppg LSND Pump #1: 30 spm = 130 psi; 40 spm = 160 psi Pump #2: 30 spm = 130 psi; 40 spm = 160 psi 6/11/2019 6/12/2019 2.00 INTRMI DRILL OTHR P Drop 1.25" OD Ball to activate/unlock 2,420.0 2,420.0 22:00 00:00 Rhino UnderReamer. Rotate and Reciprocate 5' while pumping @ 12 spm per SLB Rep. 63 psi, 30 rpm, 2- 3k TO. Note 100 psi increase at 150 strokes, continue to pump to 420 strokes. Stage pumps up to 50 spm Q 1355 psi then observe pressure fall to 55 psi. UnderReamer activated/unlocked. Stage pumps to 800 gpm, Original Pressure to 1400 psi- Reamer Open at 1150 psi. PU to 2388' MD, confirm open. PU 114k, TRPM before open 3860 rpm, after open 3720 rpm. 6/12/2019 6/12/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 2420' 2,420.0 3,029.0 00:00 06:00 MD to 3029' MD, 2686' TVD. 820 gpm, 1357 psi, 36% FO, 150 rpm, 5-6k To, 7k WOB, ECD 10.47 ppg, PU 117k, SO 11 Ok, Rot 113k, 3k TO, ADT - 3.86, Total Bit hours = 5.4, Total Jars = 146.77. 6/12/2019 6/12/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 3029' 3,029.0 3,887.0 06:00 12:00 MD to 3887' MD, 3082' TVD. 820 gpm, 1830 psi, 36% FO, 150 rpm, 9-1 ok TO, 10-17k WOB, ECD 11.33 ppg, PU 127k, SO 109k, Rot 112k, 5k TO, ADT = 3.89, Total Bit hours = 9.92, Total Jars = 150.66. 6/12/2019 6/1212019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 3887' 3,887.0 4,911.0 12:00 18:00 MD to 4911' MO, 3330' TVD. 850 gpm, 2110 psi, 38% FO, 180 rpm, 10-11 k To, 15-23k WOB, ECD 11.91 ppg, PU 128k, SO 105k, Rot 109k, 3-5k TO, ADT = 4.13, Total Bit hours = 13.42, Total Jars = 154.79. Page 7158 ReportPrinted: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Time End Time our (hr) Phase Op Code Activity Code Time P -T -X Operation Stan Depth (ftKB) End Depm(ftKB) 6/12/2019 6/13/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 4911' 4,911.0 5,863.0 18:00 0000 MD to 5863' MD, 3534' TVD. 850 gpm, 2660 psi, 38% FO, 180 rpm, 7-8k TO, 15k WOB, ECD 12.04 ppg, PU 139k, SO 111k, Rot 117k, 4k TQ, ADT = 3.95, Total Bit hours = 17.37, Total Jars = 158.74. 6/13/2019 6/13/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 5863' 5,863.0 6,632.0 00:00 0600 MD to 6632' MD, 3698' TVD. 850 gpm, 2683 psi, 37% FO, 180 rpm, 10k TO, 16k WOB, ECD 11.8 ppg, PU 133k, SO 113k, Rot 122k, 5k TO, ADT = 4.19, Total Bit hours = 21.56, Total Jars = 162.93. Pumped sweeps as needed. 6/13/2019 6/13/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 6632' 6,632.0 7,569.0 06:00 12:00 MD to 7569' MD, 3895' TVD. 850 gpm, 2862 psi, 37% FO, 180 rpm, 12k TO, 9-12k WOB, ECD 11.46 ppg, PU 145k, SO 110k, Rot 124k, 7k TO, ADT = 4.34, Total Bit hours = 25.9, Total Jars = 167.27. Pumped sweeps as needed. 6/13/2019 6/13/2019 2.75 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 7569' 7,569.0 7,970.0 12:00 14:45 MD to 7970' MD, 3979' TVD. 850 gpm, 2910 psi, 37% FO, 180 rpm, 11-12k TO, 8-27k WOB, ECD 11.56 ppg, PU 145k, Rot 124k, 7k TO, ADT = 1.99, Total Bit hours = 27.89, Total Jars = 169.29. 6/13/2019 6/13/2019 0.50 INTRMI DRILL OTHR T Lost High Line Power (to all of Alpine 7,970.0 7,970.0 14:45 15:15 field), Swap to Rig Generator Power. 6/13/2019 6/13/2019 2.75 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 7970' 7,970.0 8,301.0 15:15 18:00 MD to 8301' MD, 4047' TVD. 853 gpm, 2290 psi, 37% FO, 180 rpm, 13k TO, 13-22k WOB, ECD 11.66 ppg, PU 151 k, SO 116k, Rot 130k, 8k TO, ADT = 1.91, Total Bit hours = 29.80, Total Jars = 171.17. 6/13/2019 6/14/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 8301' 8,301.0 8,962.0 18:00 00:00 MD to 8962' MD, 4145' TVD. 855 gpm, 2665 psi, 37% FO, 180 rpm, 12-13k TO, 25k WOB, ECD 11.45 ppg, PU 148k, SO 118k, Rot 133k, 7k TO, ADT = 4.03, Total Bit hours = 33.83 Total Jars = 175.2. 6/14/2019 6/14/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 8962' 8,962.0 9,807.0 00:00 0600 MD to 9807' MD, 4288' TVD. 850 gpm, 2895 psi, 37% FO, 180 rpm, 12k TO, 11k WOB, ECD 11.21 ppg, PU 161 k, SO 118k, Rot 140k, 7-8k TO, ADT = 4.28, Total Bit hours = 38.11, Total Jars = 179.48. 6/14/2019 6/14/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 9807' 9,807.0 10,511.0 06:00 1200 MD to 10511' MD, 4633' TVD. 850 gpm, 2860 psi, 37% FO, 150 rpm, 14k TO, 10k WOB, ECD 11.00 ppg, PU 170k, SO 125k, Rot 147k, 8k TO, ADT = 4.16, Total Bit hours = 42.27, Total Jars = 183.64. Page 8158 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depm Start Time End TIM our (hr) Phase Op Code Activity Code Time P -T -X Operabon (ftKB) End Depth (nKB) 6/14/2019 6/14/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 10511' 10,511.0 11,312.0 1200 18:00 MD to 11312' MD, 5261' TVD. 850 gpm, 2800 psi, 37% FO, 170 rpm, 161k To, 15k WOB, ECD 11.35 ppg, PU 208k, SO 127k, Rot 151 k, 13k To, ADT = 3.92, Total Bit hours = 46.19, Total Jars = 187.56. 6/14/2019 6/15/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 11312' 11,312.0 12,067.0 1800 00:00 MD to 12067' MD, 6000' TVD. 850 gpm, 3262 psi, 37% FO, 170 rpm, 20k TO, 16k WOB, ECD 11.3 ppg, PU 255k, SO 157k, Rol 189k, 15k TO, ADT = 3.61, Total Bit hours = 49.8, Total Jars = 191.17. 6/15/2019 6/15/2019 6.00 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 12067' 12,067.0 12,629.0 00:00 06:00 MD to 12629' MD, 6542' TVD. 850 gpm, 3235 psi, 36% FO, 140 rpm, 21 k TO, 6.5k WOB, ECD 11.24 ppg, PU 355k (with no break over) or PU, SO or Rot weights, ADT = 4.32, Total Bit hours = 54.12, Total Jars = 195.49. 6/15/2019 6/15/2019 1.50 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 12629' 12,629.0 12,723.0 06:00 07:30 MD to 12723' MD, 6628' TVD. 850 gpm, 3526 psi, 36% FO, 140 rpm, 13k TO, 6.5k WOB, ECD 11.23 ppg, PU 285k, SO 158k, Rol 1921k, 13k TO, 6/15/2019 6/15/2019 1.25 INTRMI DRILL CIRC P Circulate BU while rotating and 12,723.0 12,723.0 07:30 08:45 reciprocating from 12723' MD to 12635' MD, 850 gpm, 3526 psi, 36% FO, 140 rpm, 12k TO Off Bottom, PU 285k, SO 159k, Rot 192k, Rot TO 13k, 1,464 bbls pumped. 6/15/2019 6/15/2019 0.25 INTRMI DRILL OWFF P Observe the well for flow. 12,723.0 12,723.0 0845 09:00 6/15/2019 6/15/2019 0.50 INTRMI DRILL RURD P Pull Trip Nipple, Install RCD bearing 12,723.0 12,723.0 09:00 09:30 1 1 1 as per MPD Rep. 6/15/2019 6/15/2019 2.50 INTRMI DRILL DDRL P Drill 9.875" Intermediate from 12723' 12,723.0 12,991.0 0930 12:00 MD to 12991' MD, 6850' TVD. 850 gpm, 3619 psi, 150 rpm, 24k TO, 301k WOB, ECD 11.62 ppg, PU 285k, SO 157k, Rot 192k, 19k TO, ADT = 2.26, Total Bit hours = 56.38, Total Jars = 197.75. 6/15/2019 6/15/2019 6.00 INTRMI DRILL DDRL P Drill 9.875"" Intermediate from 12991' 12,991.0 13,573.0 12:00 18:00 MD to 13573' MD, 7232' TVD. 845 gpm, 3704 psi, 110 rpm, 25k To, 24k WOB, ECD 11.78 ppg, PU 325k, SO 1451k, Rot 190k, 17k TO, ADT = 3.86, Total Bit hours = 60.24, Total Jars = 201.61. 6/15/2019 6/16/2019 6.00 INTRMI DRILL DDRL P Drill 9.875"" Intermediate from 13573' 13.573.0 14,045.0 18:00 00:00 MD to 14045' MD, 7412' TVD. 850 gpm, 3610 psi, 100 rpm, 22k TO, 18k WOB, ECD 11.52 ppg, PU 330k, SO 145k, Rot 187k, 18k TO, ADT = 4.63, Total Bit hours = 64.87, Total Jars = 206.24. 6/16/2019 6/16/2019 3.50 INTRMI DRILL DDRL P Drill 9.875"" Intermediate from 14045' 14,045.0 14,370.0 00:00 03:30 MD to TD at 14370' MD, 7486' TVD. 850 gpm, 3630 psi, 100 rpm, 25k TO, 241k WOB, ECD 11.47 ppg, PU 315k, SO 143k, Rot 185k, 78k TO, ADT = 3.29, Total Bit hours = 68.16, Total Jars = 209.53. Page 9158 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Depth Stan Tane End Time Dur (hr) Phase Op Code Aa fty Cafe Time P -T -k Operation (MB) End Depth (WB) 6/16/2019 6/16/2019 4.75 INTRMI CASING CIRC P Pump Final Survey, LayDown Single, 14,370.0 14,304.0 03:30 08:15 Rotate and Reciprocate pipe from 14369' MD to 14304' MD, 3700 psi, 150 rpm, 18-20k TQ, ECD 11.4 ppg, Rot 184k, 17k TQ off. Rack back every 3rd BU. 39822 total strokes pumped. 6/16/2019 6/16/2019 2.25 INTRMI CASING CIRC P Continue to Rotate and Reciprocate 14,304.0 14,230.0 08:15 10:30 while weighting up system to 10.8 ppg from 14304' MD to 14230' MD, 3700 psi, 150 rpm, 18-20k TO, ECD 11.4, Rot 194k, 17k TQ, Rack back every 3rd BU. 39822 total strokes pumped.. Obtain baseline parameters: 50 rpm, 18k TQ, 3470 psi, 800 gpm, 38601 2695 TRPM. 6/16/2019 6/16/2019 0.50 INTRMI CASING OWFF P Observe Well for Flow (STATIC). 14,230.0 14,230.0 10:30 11:00 6/16/2019 6/16/2019 1.00 INTRMI CASING OTHR P Drop Ball and pump down per SLB DD 14,230.0 14,230.0 11:00 12:00 Rep. 250 gpm, 650 psi, 1587 strokes, 140 gpm, 392 psi, 426 strokes, no indication Rhino UnderReamer closed, stage up to 800 gpm to confirm status of UnderReamer. No confirmation after comparing baseline parameters. Total 7159 strokes pumped. 6/16/2019 6/16/2019 6.00 INTRMI CASING BKRM P BROOH while Laying Down Drill Pipe 14,230.0 13,317.0 12:00 18:00 in the mousehole from 14230' MD to 13317' MD maintaining 11.3 EMW on connections with MPD. 675-610 gpm, 2625-2223 psi, 29-26 FO%, 100-150 rpm, 17k TQ,Rot 198k. 6/16/2019 6/17/2019 6.00 INTRMI CASING BKRM P BROOH while Laying Down Drill Pipe 13,317.0 12,030.0 18:00 00:00 in the mousehole from 13317' MD to 12030' MD maintaining 11.3 EMW on connections with MPD. 675 gpm, 2500 psi, 31 FO%, 100 rpm, 17k TQ,Rot 169k.. Pumped Hi -Vis sweep at 12120' MD. 6/17/2019 6/17/2019 6.00 INTRMI CASING BKRM P BROOH while Laying Down Drill Pipe 12,030.0 10,633.0 00:00 0600 in the mousehole from 12030' MD to 10633' MD maintaining 11.3 EMW on connections with MPD. 675 gpm, 2325 psi, 27 FO%, 100 rpm, 12-13k TQ, Rot 145k with pumps on. 6/17/2019 6/17/2019 6.00 INTRMI CASING BKRM P BROOH while Laying Down Drill Pipe 10,633.0 9,058.0 06:00 12:00 in the mousehole from 10633' MD to 9058' MD maintaining 11.3 EMW on connections with MPD. 600-675 gpm, 1775 psi, 30 FO%, 100-125 rpm, 12k TQ, Rol 110k with pumps on. 6/17/2019 6/17/2019 4.00 INTRMI CASING BKRM P BROOH while Laying Down Drill Pipe 9,058.0 7,925.0 12:00 16:00 In the mousehole from 9058' MD to 7925' MD maintaining 11.3 EMW on connections with MPD. 700 gpm, 1774 psi, 30 FO%, 100-125 rpm, 12k TO, Rol 128k with pumps on. 6/17/2019 6/17/2019 1.50 INTRMI CASING CIRC P Condition mud and circulate while 7,925.0 7,925.0 16:00 17:30 Rotating and Reciprocating from 7925' MD to 7831' MD. 800 gpm, 2290 psi, FO 30%,150 rpm, 12K TO (off), Rot 128k. 6/17/2019 6/17/2019 0.75 INTRMI CASING OWFF P Observe Well for Flow (STATIC). 7,925.0 7,625.0 17:30 18:15 1 6/17/2019 6/17/2019 0.75 INRMI CASING KURD P Pull MPD bearing and install Trip 7,925.0 7,925.0 18:15 19:00 1 1 Nipple. Take SPR's Page 10158 ReportPrinted: 811212019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Stan Time End Time Dur (hr) Phase Op Code Activity Code Time P-T-x Operation (flKB) End Depth n1KB) 6/17/2019 6/18/2019 5.00 INTRMI CASING BKRM P BROOH while Laying Down Drill Pipe 7,925.0 6,500.0 1900 0000 in the mousehole from 7925' MD to 6500' MD. 700 gpm, 1950 psi, 29 FO°%, 100 rpm, 7-9k TQ, Rot 120k with pumps on. 6/18/2019 6/18/2019 6.00 INTRMI CASING BKRM P BROOH while laying down DP from 6,500.0 5,600.0 0000 0600 6,500'to 5,600' MD at 700 GPM. Ran Pumps between 1,950-2,100 psi with 29% flow out at 100rpm. Observed torque between 7 and 9k ft/lbs. with a rotating weight of a 108k with pumps on. Pumped a 12.8/ppg Hi-Visc weighted sweep at 5.750' MD. 6/18/2019 6/18/2019 6.00 INTRMI CASING BKRM P Continued to BROOH while laying 5,600.0 5,230.0 06:00 12:00 down DP from 5,600'to 5,230' MD at 850 GPM. Ran pumps at — 2,700 psi with 32% flow out at 100-rpms. Observed torque between 7 and 9k fUlbs. with a rotating weight of 11 Ok with pumps on. Pumped a second 50 bbl. 12.8 ppg Hi-Visc weighted sweep at 5,350' MD. Total fluid loss for the past 12hrs — 5 bbls 6/18/2019 6/18/2019 3.00 INTRMI CASING BKRM P Continued to BROOH while laying 5,230.0 5,093.0 1200 1500 down DP from 5,230' to 5,093' MD at 850 GPM. Ran pumps at 2,730 psi with 32% flow out at 100-rpms. Cont. to observe torque between 7-9k fl/lbs. with a rotating weight of 110k with pumps on. Pumped a 50 bbl. 12.8 ppg Hi-Visc sweep at 5,350'— 5,093' MD and experienced a 73-bbl. loss and a high ECD of 13.89. 6/18/2019 6/18/2019 2.50 INTRMI CASING BKRM P Back reamed out of hole and 5,093.0 5,001.0 15:00 17:30 continued to work pipe from 5,093' to 5,001' MD at 650 GPM. Ran pumps at 1,765 psi with 28% flow out at 100- rpms. Observed torque at 7k fl/lbs, and staged up pump rate to 850 gpm and increased pipe rotation. Continued to pump the 50 bbl. of 12.8 ppg HiVisesweep. 6/18/2019 6/19/2019 6.50 INTRMI CASING BKRM P Continued to BROOH while laying 5,001.0 4,045.0 17:30 00:00 down DP from 5,001' to 4,045' MD at 850 GPM. Ran pumps at 2,250 psi with 30% How out at 125-rpms. Continue to observe torque between 7 -9k ft/lbs. with a rotating weight of 105k with pumps on. Pumped a 50 bbl. 12.8 ppg Hi-Visc sweep at 4,250' MD.Total Losses for the last 24hrs - 78 bbls. 6/19/2019 6/19/2019 6.00 INTRMI CASING BKRM P Continued to BROOH while laying 4,045.0 3,265.0 00:00 06:00 down DP from 4,045' to 3,265' MD at 850 GPM. Ran pumps at 2,360 psi with 30-80% flow out at 125-rpms. Continue to observe torque between 3 -4k ft/lbs. with a rotating weight of 98k with pumps on. Pumped a 28 bbl. 12.8 ppg Hi-Visc sweep at 3,475' MD. Page 11158 ReportPrinted: 8/12/2019 Uperations Summary (with Timelog Depths) C D5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depth(ftKB) 6/19/2019 6/19/2019 6.00 INTRMI CASING BHAH P Continued to BROOH while laying 3,265.0 2,950.0 0600 12:00 down DP from 3,265'to 2,950' MD at 675 GPM. Ran pumps at 1,380 psi with 30% flow out at 125-rpms. Continue to observe torque between 4k ft/lbs. with a rotating weight of 98k, pumps on. Pumped a 60 bbl. 12.8 ppg Hi-Visc sweep at 3,080' MD. 6/19/2019 6/19/2019 5.00 INTRMI CASING BHAH P Continued to BROOH while laying 2,950.0 2,461.0 1200 1700 down DP from 2,950 to 2,461' MD at 675 GPM. Ran pumps at 1,415 psi with 30% flow out at 125-rpms. Observed torque while rotating at 4k ft/lbs. with a rotating weight of 98k with pumps on. 6/19/2019 6/19/2019 1.00 INTRMI CASING PMPO P Pump out pf hole from 2,461'to 2,370' 2,461.0 2,370.0 17:00 18:00 MD with 750 GPM while laying DP down. Ran pumps at 1,662 psi with a flow out of 31%. Pick up weight; 105k, Slack off weight 102k. 6/19/2019 6/19/2019 1.00 INTRMI CASING PMPO P Continued to pump out of hole from 2,370.0 2,190.0 18:00 19:00 2,370'to 2,190' MD with 795 GPM. Increased Pumps to 1,810 psi with a flow out of 43%. Pulled BHA through shoe without issue. Pick up weight 105k, slack off weight 102k. 6/19/2019 6/19/2019 2.50 INTRMI CASING PMPO P Rotated and reciprocated from 2,270' 2,190.0 2,180.0 1900 21:30 to 2,180' MD with 800 GPM at 30 rpms and 1,810 psi. observed 40-60% flow out, torque remained 1-2k ft/lbs. Pumped 4ea Hi -Weight Nut -plug sweeps, total strokes 28, 726. Mud returned clean. Pick up weight was 105k and Slack off, 107k. 6/19/2019 6/20/2019 2.50 INTRMI CASING PMPO P Observed well for flow; well static. 2,180.0 1,050.0 21:30 0000 POOH to 2,180'to 1,050' MD at 300 GPM/71 SPM and observed 14% flow out with 250-320 psi.Total losses 67 bbls. 6/20/2019 6/20/2019 1.00 INTRMI CASING PMPO P Continue to POOH from 1,050'to 675' 1,050.0 675.0 0000 01:00 MD at 300 GPM, 260 psi with 12% now out. 6/20/2019 6/20/2019 1.00 INTRMI CASING OWFF P OWFF for 10 min. Well Static. 675.0 441.0 01:00 0200 continued to lay down 5 joints of HWDP, jars, and observed 19k overpull at 479' MD with a 22k overpull at 441' MD. Drained stack observed clay build up on trip nipple and in stack, suspected additional clay build on DP collar wear -bushing. Notified FMC. 6/20/2019 6/20/2019 0.50 INTRMI CASING SVRG P Serviced top drive and blocks. 441.0 441.0 02:00 02:30 6/20/2019 6/20/2019 2.50 INTRMI CASING CIRC P Filled stack and took returns across 441.0 210.0 02:30 05:00 shakers, increased pump rate from 250 - 600 -800 GPM while rotating pipe at 50 rpms with 5k ft/lbs. Pulled 62k on pipe, no overpull. Continue to lay down BHA as per SLB. 6/20/2019 6/20/2019 2.75 INTRMI CASING PMPO P Continued to lay down BHA from 210' 210.0 0.0 0500 0745 to surface, pick up weight 54k slack off weight 44k. No further rotation or circulation was required. Page 12158 ReportPrinted: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth start Time EM Time Dur (hr) Phase Op CMO Activity Code Time P -T -X Operation (MB) End Depth (ftKB) 6/20/2019 6/2012019 2.25 INTRMI CASING CLEN P Clean and cleared rig Floor, flushed 0.0 0.0 07:45 10:00 and prepped BOP's for ram change. Drained Stack and pulled wear bushing. 6/20/2019 6/20/2019 1.25 INTRM1 CASING SVRG P Held Pre -job safety meeting for ram 0.0 0.0 10:00 11:15 change and drill line slip and cut SIMOPS. Changed upper pipe rams to 7-5/8" fixed and completed drill line Islip and cut. 6/2012019 6/20/2019 0.75 INTRMI CASING BOPE P Rig up and test annular and 7-5/8" 0.0 0.0 11:15 12:00 upper pipe rams. 250 psi for low and 2500 psi for Annular, 250 psi for low and 3500 psi f/high for pipe rams. Tests good. All tests were charted as required. 6/2012019 6/20/2019 1.00 INTRM1 CASING BOPE P Rig down BOP test equipment and 0.0 0.0 12:00 13:00 cleared floor. 6/20/2019 6/20/2019 1.50 INTRMI CASING RURD P Rigged up casing equipment for 0.0 0.0 13:00 14:30 1 1 running 7-5/8" intermediate. 6120/2019 6/20/2019 3.50 INTRMI CASING PUTB P Performed pre -job safety meeting for 0.0 715.0 14:30 18:00 running 7-518" casing as per engineering planned detail. Ran csg from surface to 715' MD filling pipe staying 1jt behind top off every 10. Pick up weight 57k, Slack off -46k. 6/20/2019 6/21/2019 6.00 INTRMI CASING PUTB P Continue to run 7-5/8" intermediate 715.0 2,131.0 1800 00:00 csg string from 715.0'to 2,131' MD per the engineering detail. Continue to fill every 10 joints, Pick up weight 110K, Slack off weight 112k. Total losses in hole last 24hrs. - 9 bbls. 6/21/2019 612112019 6.00 INTRMI CASING PUTB P Made csg weight transition from 39# 2,131.0 3,850.0 00:00 06:00 to 29.7# 7-5/8" as per csg detail. Continue to run intermediate from 2,131' to 3,850' MD while filling every joint topping off every 10. Continued to monitor fluid displacement in pit 2, Pick up weight - 139k, Slack off weight -125k. 6/21/2019 6/21/2019 6.00 INTRMI CASING PUTB P Continue to run intermediate as per 3,850.0 5,995.0 06:00 12:00 detail from 3,850'to 5,995' MD filling every joint while monitoring fluid displacement in pit 2. Pick up weight - 155k, Slack off weight -116k. 6/21/2019 6/21/2019 6.00 INTRMI CASING PUTS P Continue to run 29.7# intermediate 5,995.0 8,114.0 12:00 16:00 csg as per engineering detail from 5,995'to 8,114' MD. Circulated bottoms up from 8,114' MD staging up in Y. bbl. increments until reaching scheduled target of 7 bbls..5 BPM - 134 psi; 1.0 BPM -200 psi; 1.5 BPM - 220 psi; 2.0 BPM -240 psi; 2.5 BPM - 255 psi; 3.0 BPM -270 psi; 3.5 BPM - 295 psi; 4.0 BPM -295 psi; 4.5 BPM - 295 psi; 5.0 BPM -313 psi; 5.5 BPM - 335 psi; 6.0 BPM -350 psi; 6.5 BPM - 365 psi; 7.0 BPM -395 psi. Pick up weight - 172k, Slack off weight -128k. 6/21/2019 6/22/2019 6.00 INTRMI CASING PUTS P Continue to run intermediate csg as 8,114.0 9,115.0 18:00 00:00 per detail from 8,114' to 9,115' MD filling every 10 joints while monitoring fluid displacement in pit 2. Pick up weight 178k, Slack off weight 117K. Total fluid losses for tower- 0.0 bbls. Page 13168 ReportPrinted: 811212019 la Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Stan lune End Time Dur (hr) Phase Op Cade Acth tty Code Time P -T-% Operalmn (ftKB) End Depth (fWB) 6/22/2019 6/22/2019 6.00 INTRMI CASING PUTS P Continue to run 7-518" intermediate 9,115.0 11,280.0 00:00 06:00 csg as per engineering detail from 9,115' to 11,280' MD while filling every 10 joints. Continue to monitor fluid displacement in pit 2. Pick up weight — 260k, Slack off weight 140k. 6/22/2019 6/22/2019 6.00 INTRMI CASING PUTB P Continue to run 7-5/8" intermediate 11,280.0 13,059.0 06:00 12:00 csg as per engineering detail from 11,280" to 13,059' MD while filling every 10 joints. Continue to monitor Fluid displacement in pit 2. Pick up weight— 127k, Slack off weight 95k. 6/22/2019 6/22/2019 1.25 INTRMI CASING PUTB P Continue to run 7-5/8" intermediate 13,059.0 13,326.0 12:00 13:15 csg as per engineering detail from 13,059" to 13,326' MD while filling every 10 joints. Continue to monitor fluid displacement in pit 2, Pick up weight — 0.0, Slack off weight —170k. 6/22/2019 6/22/2019 1.25 INTRMI CASING PUTB P Circulated and reciprocated csg from 13,326.0 13,363.0 13:15 14:30 13,326'to 13,363' MD with % bpm at 380 psi, step up to 1.0 bpm at 396 psi, final at 1.5 bpm with 420 psi. Pick up weight - 350k, Slack off weight — 170k, Breakover noted at 420k. Total strokes pumped — 556. Continued to monitor fluid displacement in pit 2. 6/22/2019 6/22/2019 3.50 INTRMI CASING PUTB P Continued to run 7-5/8" intermediate 13,381.0 13.921.0 14:30 18:00 csg as per engineering detail from 13,381'to 13, 921' MD while filling every 10 joints and monitoring fluid displacement in pit 2. Pick up weight - 350k, Slack off weight 166k. Experienced running difficulty at 13, 880' MD, worked pipe through tight areas with 14k ft/lbs. at % bpm and 306 psi. Attempted to break over at 490k without success, came down and continue to run csg dropping ROP to 25ft. per/min. 6/22/2019 6/23/2019 6.00 INTRMI CASING PUTB P Continued to run 7-5/8" intermediate 13,921.0 14,250.0 18:00 0000 csg as per engineering detail from 13,921'to 14,250 MD filling every 10 joints while monitoring Fluid displacement in pit # 2. Slack off weight; 100k with an average ROP of 50 ft/hr. 6/23/2019 6/23/2019 1.50 INTRMI CASING PUTS P Continued to run 7-5/8" intermediate 14,250.0 14,321.0 00:00 01:30 csg as per engineering detail from 14,250'to 14,321' MD while filling every 10 joints. Monitored fluid displacement on pit 2, Slack off weight 100k with an average ROP of 50 ft/hr. 6/23/2019 6/23/2019 0.50 INTRMI CASING PUTB P Made up FMC 7-518" fluted hgr and 14,321.0 14,361.0 01:30 02:00 landing joint and torqued the Hyddl 563 connection to 10,300 f/lbs. Made up cement hose on Volant cement swivel sub assembly, landed hgr in wellhead at 14,361' MD. Picked -up to 14,356' and began to stage up pumps at % bbl increments to 7 bpm. Page 14/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 `qW Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time our (m) Phaw Op Code Ac fiy Cole Time P-T-X Operation (N(a) End Depm (ftKB) 6/23/2019 6/23/2019 4.00 INTRMI CEMENT CIRC P Continued and slowly staged up 14,356.0 14,338.0 02:00 06:00 pumps at''/: bpm to 7 bpm while reciprocating pipe. Experienced tight hole and over pulled while working pipe. Freed pipe at 450k. Continue to work pipe to landing ring and encountered circulation pack-off. Shut pumps down and worked pipe free. Staged pumps up to 4 bpm again at % bbl increments. Lost circulation and shut pumps down. Slowly brought pumps back on line to 2 bpm with approx. 1 bbl returns. Initial pump rates; % bbl - 300psi; 1.0 bbl - 400psi; 1.5 bbls - 475psi; 2.0 bbls — 550psi; 2.5 bbls - 675psi; 3.0 bbls — 680psi; 3.5bbls — 690psi; 4.0 bbls — 720psi; 4.5 bbls-725psi; 5.0 bbls-750psi; 5.5 bbls — 775psi; 6.0 bbls — 835psi; 6.5 bbls — 835psi; 7.0 bbls — 850psi. 6/23/2019 6/23/2019 6.00 INTRM1 CEMENT CIRC P Continue to circulate and condition 14,360.0 14,338.0 06:00 12:00 mud while reciprocating from 14,360' to 14,338' MD with 2.0 bpm at 346 psi. Flow out was observed between 2- 10%, Pick up weight was observed at 350k, Slack off weight 160k. Continue to stage pumps up at % bpm to 4.5 bpm. Continue to circulate out heavy mud, 11.3 ppg with the return rate continually displaying improvement. Total strokes pumped— 16,725. 6/23/2019 6/23/2019 2.00 INTRM1 CEMENT CIRC P Continue to circulate and condition 14,338.0 14,360.0 1200 1400 mud while reciprocating from 14,338' to 14,360' MD with 4.5 bpm at 452 psi. Observed Sow out at 12% with a pick- up weight of 350k and a slack off weight of 160k. No losses at this time recorded. Strokes pumped 3,443, totaling 20,168. Conducted a pre-job safety meeting for cementing with all involved parties. SIMOPS change cup prior to Cement work. Page 15158 Report Printed: 8/12/2019 -, Uperations Summary (with Timelog Depths) C D5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start DepN StaM1 Time End Time Dur (hr) Phase Op Code Activit' Code Time P -T -X Operation (fiKa) End Depth (fixe) 6/23/2019 6/23/2019 4.50 INTRMI CEMENT CMNT P Pumped cement as per 14,360.0 14,361.0 14:00 18:30 CPAI/Schlumberger cement detail while reciprocating from 14, 360' to 14,338' MD. SLB pump 60 bbls of 11.5 ppg of Mud push and dropped lop plug, followed by pumping 99.1 bbls of 15.8 cement. Dropped bottom plug and pumped 20.2 bbls of H2O and SBL swapped over to rig pumps at 4.5 bpm and 452 psi. Flow out was observed at 12%, Pick-up weight - 350k, Slack -off weight 160k. Observed cement outrunning pumps based on steep hole inclination and noted the bottom plug landed early. With 16 bbls of cement out of shoe, observed pack - off and noting losses, attempt to pick up and move pipe at 90k over with no movement. Set hgr down in its appropriate profile without issue. Varied pump rate to obtain best returns, (1-3) bpm, top plug landed early at 6,136 strokes, pressure was observed at 1,600 psi. CIP at 1805 hrs. Total cement pumped 99 bbls, total losses, 29 bbls. 6/23/2019 6/23/2019 1.00 INTRMI CEMENT CMNT P Maintained 1600 psi for 5 -min, bled off 0.0 0.0 18:30 19:30 and shut in verifying floats. No pressure observed. Broke cement hose loose and observed for flow. Floats held. 6/23/2019 6/23/2019 2.50 INTRMI CEMENT WWSP P Rigged down remaining rasing 0.0 0.0 19:30 22:00 equipment, blew down cement hose and surface lines. Laid down 7-5/8" landing joint and volant tool. Pumped out BOP Stack, picked up 4" Test joint and R/R tool, installed 7-5/8" mandrel mg hgr pack -off, Tested Pack -off at 250 psi low and 5000psi high for 10 - min each, test good, witnessed by COP Rep. 6/23/2019 6/24/2019 2.00 INTRMI WHDBOP WOC P SIMOPS Closed blind rams, bleed 0.0 0.0 22:00 00:00 down Koomey unit, changed out upper rams from 7-5/8" fixed to 2-7/8" x 5- 1/2" VBRS. Total losses reported - (43 bbls) - 29 bbls of cemenU14 bbls of 10.8 ppg mud. 6/2412019 6/24/2019 2.00 INTRMI WHDBOP CMNT P Changed out NC -50 Saver Sub and 0.0 0.0 00:00 02:00 install 4.0" XT39 sub in conjunction with changing the top drive die blocks. 6/24/2019 6/24/2019 1.00 INTRMI WHDBOP BOPE P Installed FMC test Plug, rigged up to 0.0 0.0 02:00 03:00 test BOP's, flooded stack and lines, bled air from system, and installed test sub on top drive. 6/24/2019 6/24/2019 3.25 INTRMI WHDBOP BOPE P Test BOPE, all Tests 250 psi / 3500 0.0 0.0 03:00 06:15 psi, 5 min each. Super Choke and manual tested to 1000 psi. All tests Charted. 4" test Joint, 2-7/8" x 5-112" VBRS Upper and Lower Cavities, Choke Valves 1-15, Manual and Super Choke, Choke and Kill Manuals and HCRs, 4" Valve on Kill Line, 4" TIW & Dart, Upper and Lower IBOP. Performed Koomey drawdown and alarm test (ALL PASS) Witness Waived by AOGCC Representative Adam Earl. Page 16158 ReportPrinted: 8/1212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Oepth Start Time EM Time our (hr) Phase Op Code AcWty Cade Time P -T-% Operation (RKB) End Depth(W13) 6/24/2019 6/24/2019 1.50 INTRMI WHDBOP BOPE P Rigged down test equipment, pulled 0.0 0.0 06:15 07:45 test plug, installed wear bushing. 6/24/2019 6124/2019 2.00 INTRMI DRILLOUT BHAH P Made up 6-1/2" BHA as per SLB on 0.0 346.0 07:45 09:45 elevators from surface to 346' MD. monitored displacement on pit 8, pick up weight - 55k, Slack off weight - 50k. SIMOPS Annular LOT with 300 bbls water flush and 61 bbls freeze protect. 6/24/2019 6/24/2019 1.50 INTRMI DRILLOUT SVRG P Service top drive blocks.Trouble shot 346.0 346.0 09:45 11:15 decoder on Drawworks, continued to run operations with one motor without issue until solved. 6/24/2019 6/24/2019 2.50 INTRM1 DRILLOUT PULD P Continue to pick and RIH with 4.0" 346.0 3,000.0 11:15 13:45 doubles on elevators from 346'to 3000' MD while monitoring displacement in pit 8. Pick up weight - 84k, Slack off weight - 72k, filling every 30 doubles. 6/24/2019 6/24/2019 2.00 INTRM1 DRILLOUT PULD P Shallow hole test as per SLB Log 90' 3,000.0 3,193.0 13:45 15:45 for free ringing pipe signature from 3000'to 3,193' MD at 240 GPM and 1,330 psi at 450 ft/Hr. Pick up weight - 86k, Slack off weight - 72k. No signature/confirmation. 6/24/2019 6/24/2019 2.25 INTRMI DRILLOUT PULD P Continue to pick and RIH with 4.0" 3,193.0 5,351.0 1545 1800 Doubles on elevators from 3,193' to 5,351' MD while continuing to monitor fluid displacement on pit 8. Pick up weight - 90k, Slack off weight - 75k while filling every 30 doubles. 6/24/2019 6/25/2019 6.00 INTRMI DRILLOUT PULD P Continue RIH on elevators with 4.0" 5,351.0 9,533.0 18:00 00:00 Doubles from 5,351' to 9,533' MD while monitoring fluid displacement on pit 8. Pick up weight — 120k, Slack off weight — 80k filling pipe every 30 doubles/20 stands. Performed sonic logging at 5,351'to 5,541', 5,984 to 6,048', 6,681 to 6,744' MD, pumped a2 240 gpm with 1,675 psi while logging. 6/25/2019 6/25/2019 6.00 INTRMI DRILLOUT PULD P Continue RIH with single 4.0" 14.0# 9,533.0 12,098.0 00:00 06:00 DP on elevators from 9,533'to 11,658' MD while monitoring fluid displacement in pit 8. Continue to fill on every 20 stands. Sonic logged from 11,658'to 12,098' MD. Pump rate, 240 gpm at 1,950 psi at 11,658 while logging. 6/25/2019 6/2512019 4.75 INTRMI DRILLOUT PULD P Continued RIH with singles on 12,098.0 13,328.0 06:00 10:45 elevators utilizing the mousehole for connections from 11,658'to 13,328' MD while continuing to monitor fluid displacement in pit 8. Performed sonic log at 450 ft/hr. with 240 gpm at 1950 psi. Flow out was 12%, Pick up weight —124k, Slack off weight — 90k. 6125/2019 6/25/2019 1.25 INTRMI DRILLOUT PULD P Continue to RIH on elevators with 13,328.0 13,741.0 10:45 12:00 singles from 13,328'to 13,741' MD while monitoring fluid displacement in pit 8. Performed sonic log in recorded mode as per SLB at 900 ft/hr. Pick up weight 220k, Slack off weight -101 k. Total loses - 0, / O.A. pressure; 435 psi at 11:30. Page 17/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stmt Depth Start Time End Time our (hr) Phase Op Code Aclivity Cade Time P -T -X Operation (flKB) End Depth (W13) 6/25/2019 6/25/2019 4.00 INTRMI DRILLOUT PULD P Continue to RIH on elevators utilizing 13,741.0 14,150.0 12:00 16:00 mousehole for connections from 13,931' to 14,150' MD while monitoring fluid displacement in pit 8. Performed real time sonic log at 250 fl/hr. with 240 gpm at 2,170 psi, flow out 11 % and identified /correlate RA tag per SLB. Pick up weight - 2201k, Slack off weight- 101k. 6/25/2019 6/25/2019 1.50 INTRM1 DRILLOUT PULD P Rig up to pressure test casing and 14,150.0 14,150.0 16:00 17:30 annulus. Tested to 3,500 psi for 30 min, Test good. Bled pressure and laid down test equipment. 6/25/2019 6/25/2019 1.00 INTRMI DRILLOUT SLPC P Conducted a PJSM for Slipping and 14,150.0 14,150.0 17:30 18:30 Cutting Drill Line and slipped 55' of new tine on the drum. Recalibrated blocks, and Totco. 6/25/2019 6/25/2019 0.50 INTRMI DRILLOUT SVRG P Swiced, Top drive, Blocks, washpipe 14,150.0 14,150.0 18:30 19:00 1 1 land crown assebly. 6/25/2019 6/25/2019 0.50 INTRMI DRILLOUT PULD P Established drilling parameters and 1,415.0 14,150.0 19:00 19:30 checked SLB tools. Pick up weight - 105k, Slack off weight - 105k, ROT = 147k, Torque - 15k Ft/lbs., GPM - 180 with 1,375 psi. 6/25/2019 6/26/2019 4.50 INTRMI DRILLOUT PULD P Reamed down from 14,150'to 14,251' 14,150.0 14,290.0 19:30 00:00 MD. Encountered 5k WOB and drilled through obstruction with 18k Nibs. between 60 - 100 rpms with 1,425 psi and a 180 gpm. Tagged plugs at - 14,251' MD and continued to drill cement and shoe track. Continue to drill the 20' rat hole, and 20' of new hole to 14,290 MD' 6/26/2019 6/26/2019 2.00 INTRMI DRILLOUT PULD P Continue to drill new hole to 14,390' 14,290.0 14,390.0 00:00 02:00 MD, Back reamed through shoe and racked back one stand in prep for FIT. 6/26/2019 6/26/2019 2.00 INTRMI DRILLOUT CIRC P CBU and establish consistent mud 14,390.0 14,341.0 02:00 04:00 weight in and out at 200 gpm and 2,180 psi rotating at 40 rpms. Pick up weight - 260k, Slack off weight 110k while reciprocating 40' sections above the shoe. Total strokes -4,085. OWFF for 10 min. - Well static. 6/26/2019 6/26/2019 1.00 INTRMI DRILLOUT FIT P Conducted PJSM and rigged up for 14,341.0 14,341.0 04:00 05:00 formation integrity test. Flooded lines and functioned BOP equipment. Performed test to the specified requirements; 12.5 ppg at 739 psi max, total bbls pumped -14. Test good. Rigged down test equipment, blew down kill and cement lines. Observed Well for Flow for 10 min. Well Static. 6/26/2019 6/26/2019 1.00 INTRMI DRILLOUT MPDA P Conducted PJSM for pulling trip nipple 14,341.0 14,390.0 05:00 06:00 and the installation of RCD bearing. Removed trip nipple and installed bearing as per MPD Rep. Picked up one stand and ran back to bottom. Page 18/58 Report Printed: 8/1212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Sten Depth SW Time End Time Our (Fir) pease Op Code Activity Cade Time P -T-% Operation (flKB) End Depth (M(B) 6/26/2019 6/26/2019 4.00 PRODi DRILL DDRL P Drilled 6-1/2" production hole from 14,390.0 14,526.0 06:00 10:00 14,390'to 14,526' MD at 7,504' TVD with 240 gpm and 2,759 psi. Observed 10% flow out at 60 rpms and 100 ft/hr. Torque, 20k fl/lbs. WOB between 10- 15k lbs. ECD's were noted at 11.67 with a bottom pressure at 2,693 psi. Pick up weight -260k, slack off weight —110k. ROT was 105k at 21 k Ft/lbs. ADT, Bit, and jar time — 1.87 hrs. Prep to strip out of hole — SLB tool failure. 6/26/2019 6/26/2019 0.75 PROD1 DRILL SMPD T Stripping out hole from 14,526'to 14,526.0 14,310.0 10:00 10:45 14,310' MD with MPD. 240 psi pulling and 100 psi in slips at 1000ff/hr. Flow out — 8%, Pick up weight — 285k, Slack weight -120k. 6/26/2019 6/26/2019 0.50 PROM DRILL OWFF T Observed well for flow for 30 -min. Well 14,310.0 14,310.0 1045 11:15 Static. 6/26/2019 6/26/2019 0.75 PROD1 DRILL SMPD T Continue to strip out of hole from 14,310.0 13,200.0 11:15 12:00 14,310'to 13,200' MD with MPD. Back pressure 380 psi while pulling and 100 psi in slips at 4,0001111hr. Flow out was at 8% Pick up weight - 285k, slack off - 120k while monitoring fluid displacement in pit 8. 6/26/2019 6/26/2019 1.75 PRODt DRILL SMPD T Continue to strip out of hole from 13,200.0 11,935.0 12:00 13:45 13,200'to 11,935' MD with MPD. Back pressure 380 psi while pulling, and 100 psi in slips at 4,000ff/hr. Flow out increased to 9%. Pick up weight — 250k, slack off weight —11 ok while monitoring fluid displacement in pit 8. 6/26/2019 6/26/2019 0.50 PROD1 DRILL SMPD T Identified flow discrepancy and swap 11,935.0 11,935.0 13:45 14:15 from mud pump 2 to 1 on the injection line. Identified faulty popoff on pump 2, change valve and continued with operation. SIMOPS—serviced top drive and iron roughneck. 6/26/2019 6/26/2019 3.75 PROM DRILL SMPD T Continue to strip out of hole with MPD 11,935.0 7,008.0 14:15 18:00 from 11,935'to 7,008' MD with MPD. Back pressure 272 psi while pulling and 100 psi in slips at 5.000ft/hr. Flow out remained at 9%, Pick up weight - 170k, slack off weight — 70k while monitoring fluid displacement in pit 8. 6/26/2019 6/27/2019 6.00 PRODt DRILL SMPD T Continue to strip out of hole with MPD 7,008.0 406.0 18:00 00:00 from 7,008'to 406' MD. Back pressure, 241 psi while pulling, 100 psi while in slips at 5,000ft/hr. Flow out, 9%, Pick up weight -250k, Slack off weight — 110k while monitoring displacement in pit 8. Observed well for flow for 15 -min. Well Static. Conducted PJSM for removing RCD bearing and installation of the trip nipple. Shut pumps down and line up on hole fill over top and manually strapping the trip tank. Pulled back in derrick one stand and prep for laying down BHA. CA pressure at 17:00 — 460 psi. Losses for tour — 0.0 Ms. Page 19158 ReportPrinted: 8/12/2019 Uperations Summary (with Timelog Depths) CDS-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Siert Depth StartTime End Tune our (hr) Phase Op Cme Activity Cade Time P -T -X Operation (flKB) End Depth (aKB) 6/27/2019 6/27/2019 2.50 PROD? DRILL BHAH T Conducted PJSM for laying down 406.0 0.0 00:00 02:30 BHA. Pulled and laid down the BHA #3 as per SLB rep. Racked back jars and HWDP, laid down the remaining BHA assembly. Removed and inspected bit no physical damage noted. Pick up weight -50k, Slack off weight 49k. Removed power drive sleeve and replaced. Cleaned rig floor and picked up BHA #4. 6/27/2019 6/27/2019 0.50 PRODt DRILL SVRG P Serviced blocks, top drive, wash pipe, 0.0 0.0 02:30 03:00 and changed dies in the ST -80. 6/27/2019 6/27/2019 2.00 PROD1 DRILL BHAH T Conducted PJSM for picking up BHA 0.0 373.0 03:00 05:00 #4. Made up the BHA from surface to 373'. Picked up tools from pipe shed and torqued as per SLB rep. 6/27/2019 6/27/2019 1.00 PROD1 DRILL TRIP T Tripped BHA into hole on elevators 373.0 1,763.0 05:00 06:00 from 373'to 1,763' MD. Pick up weight — 70k, slack off weight — 60k with continuous hole fill. Applied tripping schedule and filled pipe every 20 stands while monitoring fluid displacement in pit 8. 6/27/2019 6/27/2019 6.00 PROD1 DRILL TRIP T Continued to trip in hole with BHA #4 1,763.0 10,900.0 06:00 12:00 on elevators as per tripping schedule from 1,763'to 10,900' MD. Pick up weight— 105k, slack off - 70k. Filling pipe every 20 stands while monitoring fluid displacement in pit 8. SIMOPS— Finished commissioning NOVOS as per NOV Rep. O.A. Pressure at 03:00 —135 psi / Tour losses — 0.0. 6/27/2019 6/27/2019 2.75 PROD1 DRILL TRIP T Continue to trip in hole on elevators as 10,900.0 14,124.0 1200 14:45 per schedule from 10,900' to 14,124' MD. Pick up weight - 273k, slack off weight - 140k filling every 20 stands. Continue to monitor fluid displacement in pit 8. Changed iron roughneck hose. 6/27/2019 6/27/2019 0.75 PROD1 DRILL OWFF T Observed well for flow for 10 min. Well 14,124.0 14,124.0 14:45 15:30 Static. Pulled Trip nipple and installed RCD bearing. 6/27/2019 6/27/2019 1.25 PROW DRILL REAM T Wash and ream from 14,124'to 14,124.0 14,402.0 15:30 16:45 14,402' MD at 220 gpm and 1,935 psi with a rotating weight of 119k while closing MPD chokes on connections. 6/27/2019 6/27/2019 0.25 PROD1 DRILL SMPD T Bail struck derrick, recorded 14,402.0 14,303.0 16:45 17:00 equipment damage, right side bail from drillers cabin struck lower derrick support bracket. Assessed damage and stripped out of hole 2 stands into shoe from 14,402'to 14,303' MD and secured well. Pick up weight -290k, slack off weight 140k. 6/27/2019 6/28/2019 7.00 PROD1 DRILL RGRP T CPAI management was notified and 14,303.0 14,303.0 17:00 00:00 1st report generated. Conducted a safety stand down meeting followed with a detailed assessment of the damaged equipment. Weld repair required to the lower support member on derrick followed by a full visual inspection of the derrick, top drive and rail assembly and pipe elevator. Both bails removed and replaced, pending inspection. O.A pressure - 200 psi, total tour losses - 0.0 Page 20/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 %0 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stat) Depth Stall Time End Time our (hi Phase Op Cade Adivity Code Time P -T -X Operation hKB) End Depth(ftKB) 6/28/2019 6/28/2019 0.50 FROM DRILL DDRL P Re-setAmphion and crown o-matic, 14,303.0 14,303.0 0000 00:30 adjusted link tilt compensating for the long bails. Function tested bail positioning for board clearance, and calibrated blocks accordingly. 6/28/2019 6/28/2019 2.00 FROM DRILL DDRL P Bled pressure off MPD and tripped in 14,303.0 14,526.0 0030 02:30 one stand on elevators through the shoe. Observed 81k WOB and continued to run in hole. Functioned SLB tooling while circulating and reciprocating from 14,431'to 14,526' MD looking for gas. Circulated at 220 gpm and 2,025 psi with 19f ft/lbs. at 40 rpms. Pick up weight — 228k, slack off weight — 1041k. Total Gas units observed — 410 units 6/28/2019 6/28/2019 3.50 FROM DRILL DDRL P Drilling 6-1/2" production hole from 14,526.0 14,687.0 02:30 06:00 14,521 14,687' MD at 7,520 TVD. Increased pump to 245 gpm with 11% flow out at 1,810 psi while rotating at 120 rpms with 19k ft/lbs. Pick up weight— 2201k, slack off weight — 1251k. rotating weight — 144k with 171k ft/lbs. ECD's — 10.1 — 10.3 ppg 6/28/2019 6/28/2019 6.00 PROD1 DRILL DDRL P Continue drilling from 14,687'to 14,687.0 15,544.0 06:00 12:00 15,544' MD, 7,518' TVD. Pumps remained at 245 gpm with slight increase of 14% flow out at 2,240 psi while rotating at 160 rpms with 10K ft/lbs. 19k weight on bit. Off bottom pressure - 2,200 psi, pick up weight - 190k, slack off weight 1251k with a rotating weight of 144k, and 17k ft/lbs 6/28/2019 6/28/2019 6.00 FROM DRILL DDRL P Continue to drill 6-1/2" hole from 15,544.0 16,585.0 1200 1800 15,544'to 16,585' MD, 7,523 TVD. Pumps at 270 gpm with 171k weight on bit 2,440 psi. w/pumps on and off. Continue to rotate at 160 rpms with 10 -12k Ft/lbs. Pick up weight 1861k, slack off weight 1171k and string weight - 144k. Torque — 5k f1/lbs., observed slight ECD increase to 10.7 ppg with total units of gas, 3237. 6/28/2019 6/29/2019 6.00 FROM DRILL DDRL P Continue to drill 6-1/2" hole from 16,585.0 17,633.0 18:00 0000 16,585'to 17,633' MD, 7,530' ND. with 18k on bit. Flow in is at 270 gpm with 2,720 psi, pumps off -2,675 psi. Continue to rotate at 160 rpms with 10 -12k ft/lbs. Pick up weight— 187k, slack off weight — 114k. String weight — 145k at 6k fl/fibs. ECD's — 11.5 ppg, total units of gas — 4200. ADT — 13.93, hrs, Bit hrs. — 13 93, Jar hrs. — 15.80. Page 21/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log SW Depth Start Time End Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (M1KB) End Depth(WB) 6/29/2019 6/29/2019 6.00 PROD1 DRILL DDRL P Continue drilling 6-1/2" production 17,633.0 18,264.0 00.00 06:00 hole with MPD from 17,633'to 18,260' MD. TVD — 7,537', 10k weight on bit with 270 gpm, and 2,760 psi with pumps on, 2,665 psi w/pumps off at 120 rpms. Pick up weight 189k, down weight 115k, string weight 147147k w/7k ftAbs. ECD's 10.8 ppg, gas returned 3,800 units. Encountered Fault Et at 18,264' MD, stalled and lost circulation, picked off bottom with 10k overpull, freed pipe and continued to lose circulation. Pumped down drill pipe at 2 bbl per min. with no returns. Lined up injection pump and filled backside at 25 gpm and 85 gpm on drill pipe with 600 psi. Continued to rotate at 10 rpm, pick up weight 190k, slack off weight 115k. 6/29/2019 6/29/2019 1.75 PROD1 DRILL CIRC P Continued to circulate at 84 gpm and 18,264.0 18,234.0 06:00 07:45 600 psi, pumped 30 bbl LCM pill, squeezed in loss zone with 200 psi back pressure, and recorded 75% returns. 6/29/2019 6/29/2019 4.25 PROD1 DRILL DDRL P Continued to drill ahead with MPD 18,264.0 18,768.0 07:45 12:00 from 18,264' to 18,768' MD, 7,562' TVD with 18k weight on bit at 240 gpm and 2,150 psi with pumps and 2,140 psi pumps off. Pipe rotation; 140 rpm and 1O fUlbs. Pick up weight 192k, down weight 112k and string weight 147k with 6k ft/lbs. readback. ECD's 10.6 ppg, and gas 4916 units. 6/29/2019 6/29/2019 6.00 PROD1 DRILL DDRL P Continued to drill 6-1/2" production 18,768.0 19,270.0 12:00 18:00 hole with MPD from 18,768'to 19,270' MD, 7,572' TVD. Weight on bit varied between 4-18k at 240 gpm and 2,260 psi with pumps on and 2,260 psi pumps off. Rotating pipe at 140 rpms with a torque readback of 9-12k ft/lbs. Pick up weight, 198k, down weight, 107k with a string weight of 143k and 7k fUlbs. torque. ECD's 10.48 ppg and Gas returned — 2,905 units. 6/29/2019 6/30/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6-1/2" production hole 19,270.0 20,006.0 18:00 00:00 with MPD from 19,270'to 20,006' MD, 7,582 TVD. 4-18k weight on bit at 240 gpm and 2,260 psi with pumps on, 2,260 psi with pumps off. Rotating between 120-140 rpms with 9 to 11k ft/lbs. Pick up weight 198k, down weight 106k, string/rotating weight 142k with a bottom hole torque of 13k fl/lbs. ECD's 10.59 ppg, gas returned 2905 units. Pumped 20bbl Low vise, and 20 bbl Hi Vise sweep at 19,340' MO. Actual drilling time 3.63 hrs; Bit time 24.69, Jar him 26.56. Daily tour loss to formattion - 978 bbls Page 22/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Dep[h Start Time End Time Cur (m) Phase Op Corte Activity Corte Time P -T -X Operation (ftKB) Eno Dept (ftKB) 6/30/2019 6/30/2019 6.00 PROD1 DRILL DDRL P Continue to drill 6-1/2" production hole 20,006.0 20,856.0 00:00 06:00 with MPD from 20,006'to 20,856' MD, TVD 7,591'. Weight on bit 4-20k, at 240 gpm with 2,390 psi pumps on and 2,345 psi pumps off. Rotating at 140- 150 rpms with 12-12k ft/lbs. Pick up weight 198k, down weight 106k and string weight 151 k with 13k ft/lbs. ECD's 10.59 ppg gas returns 2,253 units. Pumped 21 -low and 20 bbl high vise anti jamming sweep at 20,480' MD. Actual drilling time 3.85 hrs, bit time 33.19hrs, and jar time 35.06. 6/30/2019 6/30/2019 6.00 PROD1 DRILL DDRL P Continue to drill production hole with 20,856.0 21,713.0 0600 1200 MPD from 20,856'to 21,713' MD, TVD 7,600'. Weight on bit 15-23k at 240 gpm with 2,455 psi with pumps on and 2,455 psi pumps off. Rotating at 140 rpms at 12k ft/lbs. Pick up weight 2005k down weight 86k and string weight 139k with 9k ft/lbs. ECD's 10.9 ppg gas returns 2,546 units. Pumped a 24 bbl low and 14 bbl high vise anti - jamming sweep at 21,170' MD. Actual drilling time 4.04, Bit time 37.23 his, and jar time 39.10 his 6/30/2019 6/30/2019 1.50 PROD1 DRILL DDRL P Continue drilling production hole with 21,713.0 21,903.0 1200 1330 MPD from 21,713'to 21,903' MD, TVD 7,602. Weight on bit 19k at 261 gpm at 2,930 psi with pumps off and 2,930 psi pumps off. Rotating at 140 rpms with 16k ft/lbspick up weight 203k down weight 203k and string weight 140k with 9k ftlbs. ECD's 10.9 ppg actual drilling time .63, bit time 37.86 his, and jar time 39.73 hrs. 6/30/2019 6/30/2019 1.50 PRODi DRILL SIPB P Conducted MPD Drawdown test for 21,903.0 21,903.0 1330 1500 ballooning and hydrostatic overbalance at 5 rpms and 9k ft/lbs Data / Charts submitted to engineering for review. Verified well is breathing, Ballooning. 6/30/2019 6/30/2019 3.00 PRODi DRILL DDRL P Continued to drill production hole with 21,903.0 22,379.0 15:00 18:00 MPD from 21,903'to 22,379' MD, 7,601' TVD. Weight on bit 19k at 261 gpm with 2,930 psi [umps on and 2,930 psi with pumps off. Rotating at 140 rpms with 16k fUlbs. Pick up weight 203k, down weight 83k and string weight 140k and 9k fUlbs. ECD's 11.1 gas return 5,828 units. Actual drilling time 1.7 hrs, bit time 39.56 furs, and jar time 41.43 hrs. 6/30/2019 7/1/2019 6.00 PROD1 DRILL DDRL P Continued to drill 6-1/2" production 22.379.0 23,205.0 18:00 00:00 hole with MPD from 22,379' to 23,205' MD, TVD 7,601'. Weight on bit 19k ft/lbs. with 261 gpm at 2,930 psi with pumps on, pumps off 2,930 psi. Rotating at 140 rpms with 16k ft/lbs. Pick up weight 203k down weight 83k, and string weight 140k with 9k ft/lbs. ECD's 11.13 ppg, max gas returns 5,828 units. Actual drilling time 1.7 hrs, Bit time 39.56, and Jar time 41.43 hrs. Page 23158 ReportPrinted: 8/12/2019 uperations Summary (with Timelog Uepths) CD5-98 is Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth start Time End Time D,ir(ho Phase DIP Code Activity Code Time P -T -X Operation (RK8) End Depth(RKB) 7/1/2019 7/1/2019 4.75 PROD1 DRILL DDRL P Continued to drill with MPD from 23,205.0 23,475.0 00:00 04:45 23,205' to 23,475' MD and 7,607' TVD at 240 gpm and 2,790 psi with pumps on and 2,725 psi with pumps off. Rotating at 140 rpms with torque ranging between 14-16k ft/lbs. Pick up weight 206k, down weight 101k and string/rotating weight at 140k and 9k fl/lbs. ECD's - 11.19 ppg with 2,353 units of gas returned. Pumped a Low - high visc anti -jamming sweep at 23,370' MD and again at 23, 410' MD. Actual Drilling time -2.13 hrs, Bit time — 45.77 hrs, Jar time — 47.64 trouble shooting MWD tooling 7/1/2019 7/1/2019 2.00 PROD1 DRILL CIRC T Circulated bottoms up and 23,475.0 23,424.0 04:45 06:45 reciprocated pipe at 240 GPM with 2,960 psi at 40 rpms with 10k fUlbs. flow back at 11 % racked back one stand 23,424' MD. 7/1/2019 7/1/2019 0.50 PROD1 DRILL SVRG T Changed out top drive bell guide and 23,424.0 23,424.0 06:45 07:15 adjusted tilt link clamps. 7/1/2019 7/1/2019 4.75 PROD1 DRILL BKRM T Back reamed out of hole from 23,424' 23,424.0 21,333.0 07:15 12:00 to 21,.330' MD at 200 gpm and 1,620 psi with 120 rpms and 10k ft/lbs. 8% flow back. 7/1/2019 7/1/2019 6.00 PROD1 DRILL BKRM T Continue to back ream out of hole 21,333.0 18,103.0 12:00 18:00 from 21,333'to 18,103' MD with 200 gpm and 1,501 psi at 120 rpms. 61k It/lbs. and 10% flow out. Pick up weight 180k down weight 117k, string/rotating weight 146k with 5-6k fit/lbs 7/1/2019 7/2/2019 6.00 PROD1 DRILL SIPS T Circulated bottoms up to remove gas 18,103.0 18,103.0 18:00 00:00 in well, prepped for finger printing in efforts to determine pore pressure. Circulated 9.0 ppg, 6,200 total strokes pumped and observed 626 units of returned gas. Conducted test while monitoring pressures and volumes at MPD monitor and trip tank. Starting pressure 249 psi with a final shut of 130 psi. Total volume bled to tank 23.85 bbls. Circulated bottoms up to clear well of any induced gas. Pumped at 245 gpm w 2,195 psi. Gas units returned 4,308. Performed SIMOPS— processed 4.5 production liner in pipe shed. O.A. pressure @ 23:00 — 185 psi; total losses 137 bbls. 7/2/2019 7/2/2019 1.00 PROD1 DRILL CIRC T Continue circulating bottoms up to 18,103.0 18,103.0 0000 01:00 remove gas in well. 245 gpm, 2,195 psi. 6,825 strokes pumped (687 bbls) pumped with total gas of 4308 units. 7/2/2019 7/2/2019 4.50 PROD1 DRILL SMPD T Strip Out Of Hale from 18,103' MD to 18,103.0 14,300.0 01:00 0530 14,300' MD maintaining Back Pressure Through MPD chokes and supplying pressure through the injection line using Mud Pump #1 @ 5 bpm. PU Wt = 1831k, SO Wt = 110k. Monitoring Displacement on Trip Tank and manually strapping the pit every 5 stands OA Pressure @ 05:00 170 psi. Page 24158 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Depth Stan Time End Time our(hr) Phese Op Code Activity Code Time P -T-% Dpamon (Po(B) End Depth (aKB) 7/2/2019 7/2/2019 0.50 PRODI DRILL SVRG T Serviced Top Drive, Wash Pipe & ST- 14,300.0 14,300.0 05:30 06:00 80. Replaced dies on ST -80 and pressured washed Wash Pipe. SIMOPS: Removed Fluid from Pits to prepare for 9.7 ppg Brine Displacement. 7/2/2019 7/2/2019 1.50 PROD1 DRILL CIRC T Circulate @ 215 gpm, 1565 psi, 10% 14,300.0 14,300.0 06:00 07:30 FO, Weight Up Brine to 9.7 ppg and prepare pits for displacement. 7/2/2019 7/2/2019 2.25 PROD1 DRILL CIRC T Displace well to 9.7 ppg Visoosifed 14,300.0 14,300.0 07:30 09:45 Brine: Pump 30 bbl Hits 9.7 ppg spacer, pump 664 bola 9.7 ppg Viscosifled Brine @ 263 gpm, ICP 2950 psi, FCP 1660 psi, 40 rpm, 3-4k TO, 12% FO, 33 bbls lost during displacement. 7/2/2019 7/2/2019 0.75 PROD1 DRILL OWFF T Shut in MPD chokes 93 psi, 65psi 14,300.0 14,300.0 09:45 10:30 after 20 minutes. Bleed off pressure in 4 stages. 3.5 bbls returned. 7/2/2019 7/2/2019 1.00 PROD1 DRILL OWFF T OWFF @ RCD: Initial Flow 3.2 bph, 14,300.0 14,300.0 10:30 11:30 after 60 minutes .36 bph. 7/2/2019 7/2/2019 0.50 PRODI DRILL SMPD T Strip Out Of Hole from 14,300' MD to 14,300.0 13,826.0 11:30 12:00 13,826' MD with 4" Drill Pipe being racked back in Derrick. PU Wt: 174k, SO Wt = 130k; holding back pressure via MPD, 50 psi in slips, 190 psi out of slips. Monitor Displacement via pit 3. Tour losses = 37 bola 7/2/2019 7/2/2019 6.00 PROD1 DRILL SMPD T Continue Stripping Out Of Hole from 13,826.0 2,178.0 12:00 18:00 13,826' MD to 2,178' MD with 4" Drill Pipe being racked back in Derrick. PU Wt: 76k, SO Wt = 70k; holding back pressure via MPD, 50 psi in slips, 190- 115 psi out of slips. Monitor Displacement via pit 3. 7/2/2019 7/2/2019 1.50 PRODI DRILL SMPD T Continue Stripping Out Of Hole from 2,178.0 400.0 18:00 19:30 2,178' MD to 400' MO with 4" Drill Pipe being racked back in Derrick. PU Wt: 50k, SO Wt = 50k; holding back pressure via MPD, 50 psi in slips, 190- 115 psi out of slips. Monitor Displacement via pit 3. 7/2/2019 7/2/2019 1.00 PRODI DRILL OWFF T Observe Well for flow via MPD valve. 400.0 400.0 19:30 20:30 (slows to no flow, STATIC) 7/2/2019 7/2/2019 0.75 PROD1 DRILL MPDA T Remove RCD bearing and install trip 400.0 400.0 20:30 21:15 nipple and hole FII line. OA Pressure @ 22:30 125 psi 7/2/2019 7/2/2019 1.75 PRODI DRILL BHAH T Rack back 4 stands of 4" HWDP and 400.0 0.0 21:15 23:00 jars. Lay Down SLB BHA #4 per SLB Rep. 7/2/2019 7/2/2019 0.50 PROD1 DRILL RURD T Clean and Clear Rig floor, move BHA 0.0 0.0 23:00 23:30 components and un needed BHA Subs. 7/2/2019 7/3/2019 0.50 PRODI DRILL MPSP T Pull 6.875" wear ring and install test 0.0 0.0 23:30 00:00 plug in tubing spool. SIMOPS: Prep for BOPE test. Tour losses: 80.8 bbls 7/3/2019 7/3/2019 2.50 PROD1 WHDBOP RURD T Rig Up test equipment. Flood with 0.0 0.0 00:00 02:30 water. Proceed with Body Test. Contact AOGCC Inspector Lou Laubenstein. Page 25158 Report Printed: 8/12/2019 uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth start Time End Time our (hr) Phase Op Cade Advity Code Time P -T -X Operabon (RKB) End Depth mK8) 7/3/2019 7/3/2019 5.00 PROW WHDBOP BOPE T Test BOPE. Test witnessed by 0.0 0.0 02:30 07:30 AOGCC Representative Lou Laubenstein. All tests 250 psi Low / 3,500 psi High. 5 min High / Low, all charted, Manual and Super Choke tested 250 psi Low / 2000 psi High. Tested with 4" and 4.5" test joints. Test Annular, Upper VBR 2-7/8"x5", Lower VBR 2-7/8"x5", Chokes Valves 1-15, Manual and Super Choke, Choke and Kill Manual and HCRs, 4" valve on kill line, XT39 FOSV, XT39 Dart Valve, Lower IBOR Perform Koomey Drawdown, Accumulator Pressure 3000 psi, Manifold Pressure 1500 psi, Accumulator 1600 psi after all functions on bottles, 15 sec for 200 psi build, 102 seconds to full system pressure with electric pump and air pumps. 6 bottle Nitrogen Average 1883 psi, Closing Time Annular 23 seconds, Upper VBR 21 seconds, Blind/Shear Rams 16 seconds, Lower Pipe Rams 17 seconds, Choke HCR 2 seconds, Kill HCR 2 seconds. Witnessed by AOGCC Representative Lou Laubenstein. 7/3/2019 7/3/2019 1.00 PROD1 WHDBOP RURD T Rig Down, Blow Down all test 0.0 0.0 07:30 08:30 equipment. SIMOPS: Prep for Upper IBOP Change Out. Install Grease Fitting on top drive traction motor. 702019 7/3/2019 0.50 PROD1 WHOBOP MPSP T Pull test plug, Install wear ring (7" ID). 0.0 O.0 08:30 09:00 Lay Down Test Joint. 7/3/2019 713/2019 5.00 PROD1 WHDBOP RGRP T Change Out Upper IBOP and Saver 0.0 0.0 09:00 14:00 Sub. Monitor well on pit 3. (6 bph static loss rate) 7/3/2019 7/3/2019 1.75 PRODi WHDBOP BOPE T Test Upper IBOP and Saver Sub to 0.0 0.0 14:00 15:45 250 psi Low / 3,500 psi High (Charted). Witness of this particular retest waived by AOGCC Representative Lou Laubenstein (all previous test witnessed). Change Out 3 valves on BOP Test Manifold. 7/3/2019 7/3/2019 2.25 PROD1 DRILL SLPC T Slip and Cut 141' of Drilling Line (18 0.0 0.5- 15:45 18:00 wraps). SIMOPS: Install 132" Top Drive Bails and 4" elevators, Calibrate Block Height, Change Out Wash Pipe, Adjust Link Tilt. 7/3/2019 7/3/2019 0.25 PROD? DRILL SFTY T PJSM Pick Up BHA #5 with SLB DO 0.0 0.0 18:00 18:15 and MWD Rep. 7/3/2019 7/3/2019 2.25 PROD1 DRILL BHAH T Pick Up BHA *5 and per SLB DO and 0.0 385.0 18:15 20:30 MWD Rep. Maintain Constant hole fill over the top manually strapping trip tank after BHA in hole. 7/3/2019 7/3/2019 3.25 PRODi DRILL TRIP T Trip in hole w/ BHA#5 from Derrick 385.0 2,000.0 20:30 23:45 checking hard band on Drill Pipe on way in replacing bad joints with new joints. Replaced 10 joints. Monitor displacement on Pit #3 manually strapping every 5 stands. PU Wt 80k, SO Wt 72k. 7/3/2019 7/4/2019 0.25 PROD? DRILL CIRC T Pertorm Shallow Hole Test of BHA as 2,000.0 2,000.0 23:45 00:00 1 per SLB DO Rep. Pumped 220 gpm, j 1190 psi. Page 26158 Report Printed: 811212019 Uperations Summary (with Timelog Depths) 4 CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Star) Depth Steri Time End Time Dur (hr) Phase Do Code ActVay Code Time P -T -X Operation (RKB) End Depth (ftKB) 7/4/2019 7/4/2019 6.00 PROD1 DRILL TRIP T Trip in hole from 2000' MD to 8,498' 2,000.0 8,498.0 00:00 06:00 MD from the Derrick. Replace bad hard band joints as found. Replaced 18 more joints (28 total so far) in the string. Monitoring displacement on trip with pit #3, manually strapping every 5 stands. Filled pipe every 20 stands. 7/4/2019 7/4/2019 5.00 PRODi DRILL TRIP T Trip in hole from 8,498' MD to 14,247' 8,498.0 14,247.0 0600 11:00 MD w/ 4" Drill Pipe from Derrick. Replace bad hard band joints as found. Replaced 4 more joints (32 total so far) in the string. PU Wt 1851k, SO Wt 130k. Monitoring displacement on trip with pit #3, manually strapping every 5 stands. Filled pipe every 20 stands. Located RATag at 13,887' MD. OA Pressure @ 11:00 175 psi. 7/4/2019 7/4/2019 0.50 PRODt DRILL OWFF T Observe Well for Flow. (STATIC with 14,247.0 14,247.0 11:00 11:30 slight loss) 7/4/2019 7/4/2019 0.50 PROD1 DRILL RURD T Pull Trip Nipple. Install MPD RCD 14,247.0 14,258.0 11:30 12:00 Bearing. SIMOPS: OWFF (STATIC with slight loss); PJSM, Circulate well over to 9.1 ppg FloPro Drilling Mud. Tour losses 65 BBLs 7/4/2019 7/4/2019 3.00 PROD1 DRILL CIRC T Displace well to 9.1 ppg FloPro drilling 14,258.0 14,258.0 12:00 15:00 mud. Pump 30 bbl HiMs spacer. Pump 639 bbl 9.1 ppg FloPro, 226 gpm, ICP 1,820 psi, FCP 2,000 psi. PU Wt 180 k, SO Wt 117k. 7/4/2019 7/4/2019 3.00 PROD1 DRILL STRP T Strip in hole from 14,258' MD to 14,258.0 19,053.0 15:00 18:00 19,053' MD with 4" Drill Pipe from the derrick holding 60 psi out of slips and 240 psi in slips. PU Wt: 203k, SO Wt 103k. Monitoring displacement on trip with pit #4, manually strapping every 5 stands. Filled pipe every 20 stands. 7/4/2019 7/4/2019 2.50 PROD1 DRILL STRP T Strip in hole from 19,053' MD to 19,053.0 23,037.0 18:00 20:30 23,037' MD with 4" Drill Pipe from the derrick holding 60 psi out of slips and 240 psi in slips. PU Wt: 218k, SO Wt 109k. Monitoring displacement on trip with ph #4, manually strapping every 5 stands. Filled pipe every 20 stands. 7/4/2019 7/4/2019 1.25 PROD1 DRILL REAM T Ream last 5 stands to bottom while 23,037.0 23,475.0 20:30 21:45 Circulating Bottoms Up from 23,037' MD to 23,475' MD. Performed Downlink test per SLB DD. TQ 9k, ROT Wt 145k, pumped 235 gpm, 2725 psi (breaking over to 2520 psi). 7/4/2019 7/5/2019 2.25 PROD1 DRILL CIRC T Continue to Circulate Bottoms Up 240 23,475.0 23,475.0 21:45 00:00 gpm, 2750 psi, no rotation on stand #243. PU Wt 197k, SO Wt 120k. Take Slow Pump Rates. Losses for day 226 BBLs. 7/5/2019 7/5/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 23,475' 23,475.0 23,762.0 00:00 06:00 MD to 23,762' MD, 7,607' TVD, 245 gpm, 3,225 psi on, 3,180 psi off, 30-60 rpm, 12 TO, 12-20 WOB, PU Wt 209k, SO Wt 145k, ROT Wt 145k, TO 10k, ECD 10.43 ppg, Max gas 875 units, ADT 2.14, BIT hours 2.14, Jar hours 49.78. SPRs taken @ 00:00, 23,475' MD. Page 27158 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 I& Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth start Imre End Time our (hr) Phase op Code Ar ity Code Time P -T -X Operation (flKB) End Depth (ttKB) 715/2019 7/5/2019 5.50 PRODi DRILL DDRL P Drill 6.5" production hole from 23,762' 23,762.0 24,141.0 06:00 11:30 MD to 24,141' MD, 7,612' TVD, 230 gpm, 3,360 psi on, 2,850 psi off, 70 rpm, 16k TO, 15-17k WOB, PU Wt 225k, SO Wt Not Available, ROT Wt 144k, TQ 11k, ECD 10.70 ppg, Max gas 1,846 units, ADT 3.72, BIT hours 5.86, Jar hours 53.50. 7/5/2019 7/5/2019 0.25 PROD1 WHDBOP RURD P Pull off bottom and Blow Down Top 24,141.0 24,141.0 11:30 11:45 Drive, Rig Up Head Pin to circulate, 100 gpm, 1110 psi. Rig Up Test lines. 7/5/2019 7/5/2019 0.50 PRODt WHDBOP BORE P Test Upper IBOP 250 psi Low / 3,500 24,141.0 24,141.0 11:45 12:15 psi High, 5 minutes each (Charted), 7/5/2019 715/2019 0.25 PROD1 WHDBOP RURD P Rig Down test equipment and 24,141.0 24,141.0 12:15 12:30 circulating equipment, Blow Down Top Drive 7/5/2019 715/2019 5.50 PROD1 DRILL DDRL P Drill 6.5" production hole from 24,141' 24,141.0 24,565.0 12:30 18:00 MD to 24,565' MD, 7,620' TVD, 230 gpm, 3,400 psi on, 70 rpm, 14-16k TO, 15k WOB, PU Wt 2251k, SO Wt Not Available, ROT Wt 144k, TO 11 k, ECD 10.80 ppg, Max gas 4,726 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.09, BIT hours 8.95, Jar hours 56.59. SPRs taken @ 16:25, 24,425' MD. 7/5/2019 7/5/2019 2.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 24,565' 24,565.0 24,626.0 18:00 2000 MD to 24,626' MD, 7,621' TVD, 230 gpm, 3,080 psi on, 30 rpm, 9-10k TO, 7-8k WOB, PU Wt 215k, SO Wt 781k, ROT Wt 139k, TO 11 k, ECD 10.76 ppg, Max gas 3,082 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 0.83, BIT hours 9.78, Jar hours 57.42. 7/5/2019 7/5/2019 3.50 PROD1 DRILL CIRC T Troubleshoot MWD downlink. 24,626.0 24,565.0 20:00 23:30 Downlink attempted with different parameters, different mud pumps, different flow rates, etc. Downlink attempted to be sent manually. No confirmation of downlink success. Contact CPAI Engineer. Attempt to send new column of fluid down string and send downlink as new fluid is at tool. 7/5/2019 7/6/2019 0.50 PROD1 DRILL CIRC P Obtain downlink and send survey to 24,565.0 24,626.0 23:30 00:00 confirm downlink while reciprocating pipe. Pick up stand from derrick. Losses for day 235 BBLs. 7/6/2019 7/6/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 24,626' 24,626.0 25,093.0 00:00 06:00 MD to 25,093' MD, 7,628' TVD, 12k WOB, 230 gpm, 3,312 psi on, 70 rpm, 12-14k TQ, PU Wt 219k, SO Wt Not Available, ROT Wt 142k, TO 12k, ECD 10.75 ppg, Max gas 3,046 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.82, BIT hours 13.6, Jar hours 61.24. Page 28158 Report Printed: 8/12/2019 a' Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth Start Time End Time our (m) Phase Op Code Activity Code Time P -T -X Operhon (nKB) End Depth (MS) 7/6/2019 7/6/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 25,093' 25,093.0 25,569.0 06:00 12:00 MD to 25,569' MD, 7,637' TVD, 15k WOB, 230 gpm, 3,510 psi on, 70 rpm, 14-15k TO, PU Wt 226k, SO Wt Not Available, ROT Wt 146k, To 11 k, ECD 10.96 ppg, Max gas 2,281 units, MPD Baric Pressure on 0 psi, off 280 psi, ADT 3.76, BIT hours 17.27, Jar hours 64.91. SPRs taken @ 10:57, 25,470' MD. 7/6/2019 7/6/2019 6.00 PRODi DRILL DDRL P Drill 6.5" production hole from 25,569' 25,569.0 26,045.0 12:00 18:00 MD to 26,045' MD, 7,642' TVD, 6-15k WOB, 230 gpm, 3,590 psi on (3,560 psi off), 70 rpm, 12-14k TO, PU Wt 221 k, SO Wt Not Available, ROT Wt 145k, TO 13k, ECD 11.09 ppg, Max gas 2,286 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.22, BIT hours 20.49, Jar hours 68.13. 7/6/2019 7/7/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 26,045' 26,045.0 26,288.0 18:00 00:00 MD to 26,288' MD, 7,639' TVD, 6-15k WOB, 230 gpm, 3,590 psi on, 70 rpm, 12-14k TO, PU Wt 221 k, SO Wt Not Available, ROT Wt 145k, TO 12-14k, ECD 10.89 ppg, Max gas 330 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 2.40, BIT hours 22.89, Jar hours 70.53. Losses for day 769 BBLs. 7/7/2019 7/7/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 26,288' 26,288.0 26,712.0 00:00 0600 MD to 26,712' MD, 7,663' TVD, 6-15k WOB, 230 gpm, 3,486 psi on, 70 rpm, 12-14k TO, PU Wt 227k, SO Wt Not Available, ROT Wt 148k, TO 12k, ECD 10.97 ppg, Max gas 209 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.49, BIT hours 26.38, Jar hours 74.02. 7/7/2019 7/7/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 26,712' 26,712.0 26,886.0 06:00 12:00 MD to 26,886' MD, 7,668' TVD, 6-15k WOB, 230 gpm, 3,590 psi on, 70 rpm, 12-14k TO, PU Wt 227k, SO Wt Not Available, ROT Wt 148k, TO 121k, ECD 11.09 ppg, Max gas 2,286 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 1.58, BIT hours 27.96, Jar hours 75.60. 7/7/2019 7/7/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 26,886' 26,886.0 27,271.0 12:00 18:00 MD to 27,271' MD, 7,681' TVD, 14k WOB, 230 gpm, 3,712 psi on, 70 rpm, 15-16k TO, PU Wt 227k, SO Wt Not Available, ROT Wt 148k, TO 12k, ECD 11.13 ppg, Max gas 2,213 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 2.84, BIT hours 30.80, Jar hours 78.44. 7/7/2019 7/8/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 27,271' 27,271.0 27,628.0 18:00 00:00 MD to 27,628' MD, 7,686' TVD, 14k WOB, 230 gpm, 3,580 psi on, 70 rpm, 13-14k TO, PU Wt 230k, SO Wt Not Available, ROT Wt 150k, TO 12k, ECD 11.13 ppg, Max gas 852 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.40, BIT hours 34.20, Jar hours 81.84. Losses for day 837 BBLS. Page 29158 Report Printed: 8/1212019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log sten oepm Sten Mme End Time our (hr) Phase Op Code AcN4 Code Time P -T -X Operation (MHS) End Depth (ftKa) 7/8/2019 7/8/2019 6.00 PROW DRILL DDRL P Drill 6.5" production hole from 27,628' 27,628.0 28,044.0 00:00 06:00 MD to 28,044' MD, 7,688' TVD, 12k WOB, 225 gpm, 3,685 psi on, 75 rpm, 14-16k TQ, PU Wt 224k, SO Wt Not Available, ROT Wt 146k, TO 13k, ECD 11.05 ppg, Max gas 789 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.37, BIT hours 38.57, Jar hours 86.21. 7/6/2019 7/8/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 28,044' 28,044.0 28,579.0 06:00 12:00 MD to 28,579' MD, 7,692' TVD, 15k WOB, 225 gpm, 3,705 psi on, 75 rpm, 16-18k TO, PU Wt 236k, SO Wt Not Available, ROT Wt 145k, TO 13k, ECD 11.30 ppg, Max gas 1,731 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.44, BIT hours 43.01, Jar hours 90.65. SPRs taken @ 11:14, 28,523' MD. 7/8/2019 7/8/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 28,579' 28,579.0 29,094.0 12:00 18:00 MD to 29,094' MD, 7,696' TVD, 14k WOB, 225 gpm, 3,778 psi on, 75 rpm, 15-17k TO, PU W1241 k, SO Wt Not Available, ROT Wt 146k, TO 13.5k, ECD 11.36 ppg, Max gas 2,311 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.19, BIT hours 47.20, Jar hours 94.84. 7/8/2019 7/9/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 29,904' 29,094.0 29,570.0 18:00 00:00 MD to 29,570' MD, 7,702' TVD, 17k WOB, 225 gpm, 3,880 psi on, 75 rpm, 15-18k TO, PU Wt 237k, SO Wt Not Available, ROT Wt 149k, TO 14k, ECD 11.29 ppg, Max gas 1,652 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.52, BIT hours 51.72, Jar hours 99.36. Losses for day 883 BBLS. 7/9/2019 7/9/2019 6.00 PROD? DRILL DDRL P Drill 6.5" production hole from 29,570' 29,570.0 29,855.0 00:00 06:00 MD to 29,855' MD, 7,704' TVD, 15k WOB, 225 gpm, 3,715 psi on, 75 rpm, 15-17k TO, PU Wt 237k, SO Wt Not Available, ROT Wt 149k, TO 14k, ECD 11.13 ppg, Max gas 780 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 2.73, BIT hours 54.45, Jar hours 102.09. SPRs taken @ 01:00, 29,567' MD. 7/9/2019 7/9/2019 6.00 PRODt DRILL DDRL P Drill 6.5" production hole from 29,855' 29,855.0 30,370.0 06:00 12:00 MD to 30,370' MD, 7,709' TVD, 25-30k WOB, 225 gpm, 3,790 psi on, 75 rpm, 17-19k TQ, PU Wt 238k, SO Wt Not Available, ROT Wt 146k, TO 14k, ECD 11.35 ppg, Max gas 1547 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.29, BIT hours 58.74, Jar hours 106.38. 7/9/2019 7/9/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 30,370' 30,370.0 30,807.0 12:00 18:00 MD to 30,807' MD, 7,713' TVD, 10-14k WOB, 225 gpm, 3,915 psi on, 75 rpm, 17-19k TO, PU Wt 245k, SO Wt Not Available, ROT Wt 144k, TO 14.5k, ECD 11.39 ppg, Max gas 1,545 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.12, BIT hours 62.86, Jar hours 110.50. SPRs taken @ 14:23, 30,523' MD. Page 30/58 Report Printed: 811212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Start Time EM Time our (hr) Phase Op Code Activity Code Time P-T-X Operation (flKe) End Depth (flKI3) 7/9/2019 7/10/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 30,807' 30,807.0 31,190.0 18:00 00:00 MD to 31,190' MD, 7,715' TVD, 17k WOB, 223 gpm, 3,900 psi on, 75 rpm, 17-18k TQ, PU Wt 241 k, SO Wt Not Available, ROT Wt 149k, TO 15k, ECD 11.45 ppg, Max gas 579 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.22, BIT hours 67.08, Jar hours 114.72. Losses for day 1,052 BBLs. 7/10/2019 7/10/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 31, 190' 31,190.0 31,524.0 00:00 06:00 MD to 31,524' MD, 7,717' TVD, 12k WOB, 225 gpm, 3,960 psi on, 75 rpm, 18-20k TQ, PU Wt 243k, SO Wt Not Available, ROT Wt 149k, TQ 16k, ECD 11.74 ppg, Max gas 789 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.95, BIT hours 71.03, Jar hours 118.67. 7/10/2019 7/10/2019 6.00 PRODi DRILL DDRL P Drill 6.5" production hole from 31,524' 31,524.0 31,952.0 06:00 12:00 MD to 31,952' MD, 7,716' TVD, 9k WOB, 225 gpm, 3,936 psi on, 75 rpm, 18-20k TQ, PU Wt 246k, SO Wt Not Available, ROT Wt 142k, TQ 16.5k, ECD 11.75 ppg, Max gas 926 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.40, BIT hours 75.43, Jar hours 123.07. 7/10/2019 7/10/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 31,952' 31,952.0 32,320.0 12:00 18:00 MD to 32,320' MD, 7,721' TVD, 5k WOB, 230 gpm, 3,990 psi on, 80 rpm, 19k TO, PU Wt 246k, SO Wt Not Available, ROT Wt 142k, TQ 16.5k, ECD 11.99 ppg, Max gas 994 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 3.90, BIT hours 79.33, Jar hours 126.97. 7/10/2019 7/11/2019 6.00 PROD1 DRILL DDRL P Drill 6.5" production hole from 32,320' 32,320.0 32,468.1 18:00 00:00 MD to 32,468' MD, 7,767' TVD, 11 k WOB, 230 gpm, 4,070 psi on, 80 rpm, 19k TO, PU Wt 246k, SO Wt Not Available, ROT Wt 142k, TQ 16.5k, ECD 11.69 ppg, Max gas 347 units, MPD Back Pressure on 0 psi, off 280 psi, ADT 4.45, BIT hours 83.78, Jar hours 131.42. Losses for day 1,075 BBLs. 7/11/2019 7/11/2019 6.00 PROD1 CASING CIRC P While Circulating 2x Bottoms Up, Take 32,468.1 32,267.0 00:00 06:00 the final Survey, Lay Down Double, Send Downlink to zero directional tool, Rotate and Reciprocate from 32,454' MD to 32, 267' MD at 248 gpm, 4,020 psi, 10% FO, 80 rpm, 18K TQ, 1,893 BBLs pumped. Lay Down 1 stand. SPRs taken @ 05:30, 32,267' MD. 7/11/2019 7/11/2019 3.50 PRODi CASING SIPB P Perform pore pressure Draw Down via 32,267.0 32,267.0 06:00 0930 MPD, @ 32,367' MD, 5 rpm, TO 16K, Start 414 psi, after 24 cycles, 157 psi, 49.5 BBLs bled back. Pore Pressure 9.4 pPg 7/11/2019 7/11/2019 2.50 PROD1 CASING CIRC P Circulate Bottoms Up From 32,367' 32,267.0 32,158.0 09:30 12:00 MD to 32,158' MD, 248 gpm, 3,900 psi, 10% FO, 60 rpm, 18K TQ, ECD 11.54 ppg, Max Gas 3,440 units. Page 31/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) t CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log sten Depth sten Time End Time our (hr) Phe a Op Cove Actrvf y Code Time P -T -X Opergon (flKB) End Depth (Wlt) 7/11/2019 7/11/2019 0.50 PROD1 CASING CIRC P Continue to Circulate Bottoms Up from 32,158.0 32,158.0 12:00 12:30 32,158' MD to 32, 158' MD, 248 gpm, 3,900 psi, 10% FO, 60 rpm, 18K TO, ECD 11.34 ppg, Max Gas 2,585 units. Dropped 2.36" Drift w/ 120'tail into stand 335. 7/11/2019 7/11/2019 5.50 PROD1 CASING BKRM P BROOH from 32,158'MD to 32,158.0 30,188.0 12:30 18:00 30,188'MD, 235 gpm, 3,440 psi, 60 rpm, 19K TO, 11 % FO, ECD 11.25 ppg, Up Wt 236K, SO Wt Not Available, ROT Wt 141k 7/11/2019 7/12/2019 6.00 PRODi CASING BKRM P BROOH from 30,188' MD to 28,450' 30.188.0 28,450.0 18:00 00:00 MD, 235 gpm, 3,440 psi, 60 rpm, 18.5K TQ, 11 % FO, ECD 11.05 ppg, Up Wt 231 K, SO Wt Not Available, ROT Wt 142K, pump 23 BBL Low Vis, 34 BBL Hi Vis @ 29,200' MD. Losses for day 411 BBLs. 7/12/2019 7/12/2019 6.00 PROD1 CASING BKRM P BROOH from 28,450' MD to 27,000' 28,450.0 27,000.0 00:00 06:00 MD, 235 gpm, 3,000 psi, 60 rpm, 17- 19K TQ, 10 % FO, ECD 10.70 ppg, MPD Back Pressure, off 280 psi. SO Wt 78K, ROT Wt 142K. 7/12/2019 7/12/2019 4.00 PROD1 CASING BKRM P Continue BROOH from 27,000' MD to 27,000.0 25,900.0 06:00 10:00 25,900' MD, 235 gpm, 3,000 psi, 60 rpm, 17-19K TQ, 10 % FO, ECD 10.70 ppg, MPD Back Pressure, off 280 psi. PU Wt 225K, SO W181 K, ROT Wt 145K, 14K TO. 7/12/2019 7/12/2019 4.50 PROD1 CASING CIRC P Displace well to 9.7 ppg Brine, (Held 25,900.0 25,820.0 10:00 14:30 PJSM) Rotate and Reciprocate from 25,900' MD to 25,820' MD, 235 gpm, 2,850 psi, 25 rpm, 15k TO, 10% FO. 1,430 BBLs pumped. 81 BBLs lost. Take SPRs @ 25,876' MD. 7/12/2019 7/12/2019 2.00 PROD1 CASING OWFF P Perform Well Draw Down via MPD, 25,820.0 25,820.0 14:30 16:30 initial build to 95 psi, after 12 cycles (1 of 30 sec, 3 of 1 min, 3 of 2 min, 4 of 4 min) 21 psi. 17 BBLs flowback. 7/12/2019 7/12/2019 5.50 PROD1 CASING OWFF P OWFF using cup measurement. initial 25,820.0 25,820.0 16:30 22:00 flowback rate 10.71 BPH, measure every 15 minutes with decreasing flow rate to 0.67 BPH. Contact CPAI Engineer. Flow is breathing. Decision to Strip OOH. 7/12/2019 7/13/2019 2.00 PROD1 CASING STRP P Strip Out of hole from 25,820' MD to 25,820.0 25,020.0 22:00 00:00 25,020 maintaining back pressure with MPD and mud pump #2 @ 5 bpm. MPD pressure in slips 120 psi, out of slips 80 psi. PU Wt at star t was 245K, PU Wt steadily rose to 269K, SO Wt 98K, Monitor Well Displacement on pit #3. Losses for day 405 BBLs. 7/13/2019 7/1312019 2.00 PROD? CASING BKRM P BROOH from 25,020' MD to 24,500' 25,020.0 24,500.0 00:00 02:00 MD, 235 gpm, 2,150 psi, 30 rpm, TO 14-16k, FO 8%, ECD 10.30 ppg, MPD back pressure with pumps off 85 psi, PU Wt 226K, SO Wt 81 K, Rot Wt 145K, TO 14K. Page 32/58 Report Printed: 8112120191 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log shirt Depth shirt Time End Time Dur (M) Phase op code Activity Code Time P -T -x Operation (WB) End Depth (NCB) 7/13/2019 7/13/2019 1.00 PROD1 CASING STRIP P Strip OOH from 24,500' MD to 24,327' 24,500.0 24,327.0 02:00 03:00 MD, maintaining back pressure with MPD chokes and Pump #2 on backside, 3 bpm, MPD back pressure in slips 120 psi, out slips 80 psi, PU Wt 226K, SO Wt 99K, Monitoring well on pits #2 #3. Experienced overpull to 251 K. Circulate and Ream stand down, Observe Gas measurement rising at surface. 7/13/2019 7/13/2019 1.50 PROD1 CASING CIRC P Circulate gas out while rotating and 24,327.0 24,325.0 03:00 04:30 reciprocating from 24,417' MD to 24,325' MD, 230 gpm, 2,138 psi, 50 rpm, TQ 15k, Max Gas 2427 units. Pumped 518 BBLs. 7/13/2019 7/13/2019 1.50 PROD1 CASING BKRM P BROOH from 24,325' MD to 23,750' 24,325.0 23,750.0 04:30 06:00 MD, 230 gpm, 1,900 psi, 50 rpm, TQ 14-16k, FO 8%, ECD 10.30 ppg, MPD back pressure with pumps off 80 psi, PU Wt 225K, SO Wt 95K, Rot Wt 149K, 7/13/2019 7/13/2019 6.00 PROD1 CASING BKRM P BROOH from 23,750' MD to 21,536' 23,750.0 21,536.0 06:00 1200 MD, 235 gpm, 2,013 psi, 50 rpm, TO 14-16k, FO 8%, ECD 10.32 ppg, MPD back pressure with pumps off 80 psi, PU Wt 220K, SO Wt 88K, Rot Wt 147K, 7/13/2019 7/13/2019 6.00 PROD1 CASING BKRM P BROOH from 21,536' MD to 19,517' 21,536.0 19,517.0 12:00 18:00 MD, 235 gpm, 1,890 psi, 50 rpm, TO 14-16k, FO 8%, ECD 10.32 ppg, MPD back pressure with pumps off 80 psi, PU Wt 213K, SO Wt 110K, Rol Wt 145K, 7/13/2019 7/14/2019 6.00 PROD1 CASING BKRM P BROOH from 19,517' MD to 17,350' 19,517.0 17,350.0 18:00 00:00 MD, 235 gpm, 1,840 psi, 50 rpm, TQ 14-16k, FO 8%, ECD 10.25 ppg, MPD back pressure with pumps off 80 psi, PU Wt 21 OK, SO Wt 108K, Rot Wt 148K, Losses for day 263 BBLs. 7/14/2019 7/14/2019 6.00 PROD1 CASING BKRM P BROOH from 17,350' MD to 15,361' 17,350.0 15,361.0 00:00 06:00 MD, 235 gpm, 1,840-1,620 psi, 50 rpm, TQ 9-16K, FO 8%, ECD 10.25 ppg, MPD back pressure with pumps off 80 psi, PU Wt 185K, SO Wt 117K, Rot Wt 145K, MWD went down at 02:20. 7/14/2019 7/14/2019 4.00 PROD1 CASING BKRM P BROOH from 15,361' MD to 14,161' 15,361.0 14,161.0 06:00 10:00 MD, 235 gpm, 1,620 psi, 50 rpm, TO 12K, FO 8%, ECD Not Available, MPD back pressure with pumps off 80 psi, PU Wt 180K, SO Wt 115K, Rot Wt 145K, 7/14/2019 7/14/2019 2.00 PROD1 CASING CIRC P Circulate and Reciprocate until Hole 14,161.0 14,070.0 10:00 12:00 clean from 14,161' MD to 14,070' MD, 235 gpm, 1620 psi, FO 9%, 60 rpm, 1 O TO off, Rol Wt 150K. 548 BBLs Pumped. 7/14/2019 7/14/2019 1.75 PRODt CASING OWFF P OWFF per CPAI and MPD. PU Wt 14,070.0 14,070.0 12:00 13:45 200K, SO Wt 11 OK. SPRs taken a 12:00, 14,161' MD. SIMOPS: Slip and Cut Drilling Line, 141'. Page 33158 Report Printed: 8112120191 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth Stift Time EM Time our (le) Phase Op Code Activity Code Time P -T -X Operelion (RKB) End Deptlt (flKB) 7/14/2019 7/14/2019 4.25 PROD1 CASING STRIP P Strip OOH from 14,070' MD to 9,472' 14,070.0 9,472.0 13:45 16:00 MD per stripping schedule, maintaining back pressure with MPD chokes and Pump #1 on backside, 4 bpm, MPD back pressure in slips 80 psi, out slips 150 psi, PU Wt 130K, SO Wt 80K, Monitoring well on pits #2 #3. 7/14/2019 7/14/2019 2.50 PROD1 CASING STRIP P Strip OOH from 9,472' MD to 6,536' 9,472.0 6,536.0 18:00 20:30 MD per stripping schedule, maintaining back pressure with MPD chokes and Pump #1 on backside, 3.5 bpm, MPD back pressure in slips 80 psi, out slips 150 psi, PU Wt 105K, SO Wt 80K, Monitoring well on pits #2 #3. 7/14/2019 7/14/2019 0.50 PROD1 CASING RGRP P Service Top Drive, Blocks, Iron 6,536.0 6,536.0 20:30 21:00 Roughneck. 7/14/2019 7/14/2019 1.50 PROD1 CASING STRP P Strip OOH from 6,536' MD to 4,852' 6,536.0 4,852.0 21:00 22:30 MD per stripping schedule, maintaining back pressure with MPD chokes and Pump #1 on backside, 3.5 bpm, MPD back pressure in slips 80 psi, out slips 150 psi, PU W1 96K, SO Wt 75K, Monitoring well on pits #2 #3. 7/14/2019 7/15/2019 1.50 PRODi CASING PULD P Pick Up and RIH18 joints of HWDP, 4,852.0 4,852.0 22:30 00:00 rack back same (pipe management in derrick) for Liner run drill pipe string. Losses for day 180 BBLs. 7/15/2019 7/15/2019 3.50 PRODt CASING STRIP P Strip OOH from 4,852' MD to 835' MD 4,852.0 835-0- 00:00 03:30 per stripping schedule, maintaining back pressure with MPD chokes and Pump #1 on backside, 3.5 bpm, MPD back pressure in slips 80 psi, out slips 150 psi, Monitoring well on pits #2 #3. 7/15/2019 7/15/2019 5.00 PROD1 CASING OWFF P OWFF. 835.0 835.0 03:30 08:30 Initial flow back rate 7.1 bbis/hr. After 1 hr: 2.6 bbis/hr After 2 hr: 1.3 bbis/hr After 3 In: 0.63 bbls/hr After 4 hr: 0.28 bbis/hr After 5 hr. 0.28 bbls/hr Confer with town, OK to proceed ahead. 7/15/2019 7/15/2019 1.00 PROD1 CASING MPDA P Pull MPD RCD bearing and install 835.0 835.0 08:30 09:30 MPD trip nipple. 7/15/2019 7/15/2019 0.50 PROD1 CASING TRIP P TOOH racking back DP in derrick. 835.0 385.0 09:30 10:00 Monitor well on Trip Tank. PU Wt 60k, SO Wt 46k. 7/15/2019 7/15/2019 3.25 PRODi CASING PULD P Lay Down BHA #5 per SLB DD Rep. 385.0 0.0 10:00 13:15 Rack Back 2 stands of 4" HWDP from BHA in derrick. 7/15/2019 7/15/2019 1.75 COMPZI WHDBOP RURD P Pull wear ring (6.875" ID) and install 0.0 0.0 13:15 15:00 test plug per FMC Rep. SIMOPS: Rig Up for BOPE Test. Page 34158 ReportPrinted: 811212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Deem Start Time End Time Dur inn Prime, Op Code Activity Code Time P -T -x Operation (MB) End Depth(RKB) 7/15/2019 7/15/2019 4.50 COMPZI WHDBOP BOPE P BOPE test:Test all BOPE equipment 0.0 0.0 1500 19:30 250 Low / 3,500 High 5 min each. (All test charted and All test Passed). 4" and 4.5" test joints used on all rams and annular preventer Test Annular preveri 2-7/8 x 5-1/2" VBRs in UPR and LPR, Chokes Valves 1-15, Manual and Super Choke, Choke and HCR manual and HCRs, 4" valve on kill line, 4" FOSV, 4" Dart, Upper and Lower IBOP. Manual and Super Choke tested to 2,000 psi for bleed and hold pressure.Koomey drawdown test, Accumulator 2975 psi, manifold 1500 psi, acummulator 1700 psi after all functions, 14 sec for 200 psi build (2 elec Pumps, 62 sec for full build (2 elec pumps and 2 air pumps. 6 Nitrogen bottle Averagel950 psi. Closing times: Annular 23 sec, UPR 21 sec, Blind/Shear Rams 16 sec, LPR 17 sec, Choke HCR 2 sec, Kill HCR 2 sec. Test Pit and Trip tank gain/loss alarms, Flow Out high Alarm, Test H2S alarms. Witness waived by AOGCC Representative Jeff Jones 7/11/19, 11:30, 7/15/2019 7/15/2019 0.75 COMPZI WHDBOP RURD P Pull Test Plug and set wear ring 0.0 0.0 19:30 20:15 (6.875" ID) per FMC Rep. 7/15/2019 7/15/2019 1.75 COMPZI CASING RURD P Rig Up Casing Tongs, Elevators, 0.0 0.0 20:15 22:00 Running Equipment, Rig Floor and Pipe/Casing Shed for running 4.5" Liner Lower Completion. 7/15/2019 7/15/2019 0.50 COMPZI CASING SFTY P PJSM on Running 4.5"' Liner Lower 0.0 0.0 2200 2230 completion. Discussion included Llne of Fire and Exclusion zones on rig floor and in pipe/casing sheds. 7/15/2019 7/16/2019 1.50 COMPZI CASING PULD P Pick Up and Run in Hale with 4.5" liner 0.0 450.0 2230 0000 lower completion. 7/16/2019 7/16/2019 6.00 COMPZI CASING PULD P Continue to run in hole from with 4.5" 450.0 3,675.0 0000 0600 Liner 12.6# L80 HYD563 as per engineering detail from 450' to 3,675' MD. Pick up weight - 77k, Down weight - 76k while monitoring fluid displacement in pit #3 with constant hole fill. 7/16/2019 7/16/2019 6.00 COMPZI CASING PULD P Continued to run in hole with 4.5" liner 3,675.0 8,740.0 0600 1200 as per engineering detail from 3,675' to 8,740' MD. Pick up weight - 98k, Down weight - 77k while monitoring fluid displacement in pit #3 with constant hole fill. Fluid loss over last 12 hrs. - 29 bbls. 7/16/2019 7/16/2019 6.50 COMPZt CASING PULD P Continued to run hole with 4.5' liner as 8,740.0 14,298.0 12:00 18:30 per engineering detail from 8,740'to 14,298' MD. Pick up weight - 126k, Down weight - 102k while monitoring fluid displacement in pit #3 with constant hole fill. Page 35/58 Report Printed: 8/12/2019 a , Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Depth Stan Time End Time our (hr) Phase Op Code AcdAy Cade Time P -T -X Operatlon (AKB) End Depth (fixe) 7/16/2019 7/16/2019 3.00 COMPZI CASING PULD P Made up X -over atop of 4.5" liner, 14,298.0 14,298.0 18:30 21:30 Joint # 353 Q 14,298' MD. Torque / Drag data points: > Static pipe, No pumps, Rotation, or Reciprocation; Tq-71k; PU-157k; DW - 99k. > At 1 bpm and 10 rpm: Tq-8.0k; PU- 145k; DW -99k > At 2 bpm and 20 rpm: Tq-7.8k; PU- 130k; DW -119k > At 3 bpm and 30 rpm: Tq-7.0k; PU- 149k; DW -118k > Total pumped 375bbis/3918 strokes > Total fluid loss -10 bbl/hr. 7/16/2019 7/17/2019 2.50 COMPZI CASING PULD P Continued to run in hole with 4.5" liner 14,298.0 16,714.0 21:30 00:00 as per engineering detail from 14,298' to 16,714' MD. Pick up weight — 160k, Down weight — 100k while monitoring fluid displacement in pit #3. Continued with constant hole fill. 7/17/2019 7/17/2019 3.50 COMPZI CASING PUTB P Continued to RIH with 4.5" Liner from 16,714.0 17,207.0 00:00 03:30 16,714'to 17,207'MD. Pick up weight — 160k, Down weight — 100k while monitoring fluid displacement in pit #3 with constant hole fill. Made up 4.5" liner running tool assembly as per Baker Rep. 7/17/2019 7/17/2019 0.50 COMPZI CASING TRIP P TIH on DP from 17,207'to 17,460' 17,207.0 17,460.0 03:30 04:00 MD. Staged pumps up from 1 bpm at 97 -psi to 2 bpm at -148 psi and finally, 3 bpm at 246 -psi for torque and drag reference points. At 3 bpm without rotation: > Pick up weight -158k > Down Weight -99k At 3 bpm with rotation at 30 rpms: > Pick up weight— Stalled at 8k fl/lbs. torque. > Down weight— 124 with 7k flU bs. torque. 7/17/2019 7/17/2019 2.00 COMPZI CASING TRIP P Continued to TIH the 4.5" liner on DP 17,460.0 20,820.0 04:00 06:00 from 17,460' to 20,820' MD. Down weight -84k while monitoring fluid displacement in pit #3 with constant hole fill. 7/17/2019 7/17/2019 6.00 COMPZI CASING TRIP P Continued to TIH the 4.5" liner on DP 20,820.0 28,840.0 06:00 12:00 from 20,820 to 28,840' MD. Down weight -84k while monitoring fluid displacement in pit #3 with constant hole fill. Fluid loss over the last 12 hrs. — 12 bbls. OA press. 0.0 psi. 7/17/2019 7/17/2019 3.00 COMPZI CASING TRIP P Continued to TIH with 4.5" liner from 28,840.0 31,468.0 12:00 15:00 28,840'to 31,468' MD. Down weight - 98k while monitoring fluid displacement on pit #3 with constant hole fill. Page 36158 ReportPrinted: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Sten Time End Time our (hr) Phase Op Code AdhVity Code Time P -T -X Opendion (ftKB) End Depth (MB) 7/17/2019 7/17/2019 1.75 COMPZ1 CASING TRIP P Obtained setting parameters: Pick up 31,468.0 31,468.0 15:00 16:45 weight- 229k, down weight- 94k, established circulation at 3 bpm and 740 psi. Shut down pumps and dropped 1.625" ball, pumped down at 3 bpm at 660-740 psi for 1000 strokes, slowed pumps down 1 bpm from 170- 100 psi. Ball on seat at 1105 strokes, pressure increased to 2,300 psi. Released liner hanger and set ZXP packer per Baker Rep. Pressured up to 4,290 psi bled off and set down on hanger with dog sub. Confirmed with no rotation, and again with rotation at 15 rpm, Bk ft/lbs. confirmed top of liner set at 14,200' MD. 7/17/2019 7/17/2019 0.50 COMPZ1 CASING PRTS P Rigged up and pressure tested liner to 31,468.0 31,468.0 16:45 17:15 2,500 psi for 10 -min. Test good and charted. 7/17/2019 7/17/2019 2.75 COMPZ1 WELLPR CIRC P Racked back two Stands and 31,468.0 31,468.0 17:15 20:00 circulated Bottoms up staging pumps to 5 bpm at 612 psi. Total strokes pumped 5,876. Final circulation at 800 psi with 8% flow back with max Gas at 1,288 units. 7/17/2019 7/17/2019 0.75 COMPZ1 WELLPR OWFF P Observed well for flow—well static 31,468.0 31,468.0 20:00 20:45 7/17/2019 7/17/2019 1.25 COMPZ1 WELLPR PULD P Trip out of hole from 14, 100' to 13,130' 14,100.0 13,130.0 20:45 22:00 MD laying down 6 -stands of HWDP while monitoring fluid loss and filling over hole. 7/17/2019 7/17/2019 0.50 COMPZ1 WELLPR SVRG P Serviced Top Drive and blocks. 13,130.0 13,130.0 22:00 22:30 7/17/2019 7/18/2019 1.50 COMPZ1 WELLPR TRIP P Continue to trip out of hole from 13,130.0 11,995.0 22:30 00:00 13,130'to 11,995' MD. Pick up weight - 161k while monitoring fluid displacement in pit #3 with constant hole fill. Flow out 8%. Observed fluid loss for the last 12 hrs. 10 bbls. OA pressure - 0.0 psi 7/18/2019 7/18/2019 6.00 COMPZ1 WELLPR TRIP P Continue to trip out of hole from 11,995.0 484.0 00:00 06:00 11,995'to 484' MD. Pick up weight - 50k while monitoring fluid displacement in pit #3 with constant hole fill. Flow out 10%. 7/18/2019 7/18/2019 1.25 COMPZ1 WELLPR TRIP P Continued to trip out of hole from 484' 484.0 50.0 06:00 07:15 to 50' MD, pick up weight 47k, continued to monitor fluid loss in pit #3 while filling over hole. 7/18/2019 7/18/2019 0.75 COMPZ1 WELLPR BHAH P Laid down liner running tools per 50.0 0.0 07:15 08:00 Baker rep. Pick up weight 44k. Inspected dog sub, verified ZXP packer set — confirmed by Baker and COP rep. Cleared and cleaned rig floor. 7/18/2019 7/18/2019 1.50 COMPZ1 WELLPR SVRG P Slip and cut drill line, serviced and re- 0.0 0.0 08:00 09:30 calibrated top drive and blocks. Continued to monitor well bore fluid in pit #3 with constant hole fill. 7/18/2019 7/18/2019 2.00 PROD2 WHPST BHAH P Clean and cleared rig floor, moved 0.0 0.0 09:30 11:30 whipstock BHA tolling to rig floor as per Baker Rep. Page 37158 Report Printed: 8112120191 e Operations Summary (with Timelog Depths) C D5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth start Time End Time our (hr) Phase Op code Ac vily code Time P.T.X Operation ms) End Depth (Wfi) 7/18/2019 7/18/2019 0.50 PROD2 WHPST BHAH P Made up Whipstock BHA as per 0.0 120.0 11:30 12:00 Baker / BLB reps. from surface to 120' MD. Pick up weight 55k, down weight 54k. Continued to monitor well bore fluid in pit #3 while filling over hole. Total fluid loss for past 12 hrs. 5 blots, OA pressure 0.0 psi. 7/18/2019 7/18/2019 1.25 PROD2 WHPST BHAH P Continued to make up whipstock BHA 120.0 229.0 12:00 13:15 as per Baker / SLB reps. Orient MWD with Whipstock from 120.0' to 229.0' MD. Pick up weight 55k, down weight 54k while monitoring well bore fluid in pit #3. Continued to fill over hole. 7/18/2019 7/18/2019 4.75 PROD2 WHPST TRIP P Tripped whipstock BHA/Milt assembly 229.0 7,800.0 13:15 18:00 on 4.0" DP from 229'to 7,800' MD. Pick up weight 103k down weight 81 k while monitoring fluid displacement in pit #3. Continued to fill pipe every 20 stands. Shallow hole test at 2000' with MWD at 225 GPM and 600 psi. Communications verified. Flow out at 11%. 7/18/2019 7/18/2019 4.00 PROD2 WHPST TRIP P Continued to trip in hole with 7,800.0 13,991.0 1800 2200 whipstocklmill assembly from 7,800'to 13,991' MD. Logged RATag at 13,884.5'MD Pick up weight 177k down weight 130k while monitoring fluid displacement in pit #3 with constant pipe fill every 20 stands. 225 GPM, at 600 psi with 11 % flow out. 7/18/2019 7/19/2019 2.00 PROD2 WHPST WPST P Logged while tripping in hole from 13,991.0 14,098.0 22:00 00:00 13,991'to 14,098' MD, attempted to orient whipstock at 45 degrees High right, worked pipe, fell outside allowable 45-50 set degree, received variance from COP engineering to set at 40-55 degrees high right. 7/19/2019 7/19/2019 1.25 PROD2 WHPST OWFF P Observed well for flow prior to 14,098.0 14,098.0 00:00 01:15 stabbing seal assembly. Well Static. 7/19/2019 7/19/2019 1.00 PROD2 WHPST WPST P Picked up stand #148, dropped 14,098.0 14,134.0 01:15 02:15 bottom single, tagged no-go at 14,205' MD slacked off 7k, set anchor at 15k, picked up 10k over -pull to confirm set, set confirmed. Set down at 38k, sheared bolt off slide, picked up to confirm shear, shear successful. Top of Whipstock set 14,120' MD, Bottom of Whipstock 14,134' MD. Final set parameters, 45' high right as per schedule. 7119/2019 7/19/2019 0.75 PROD2 WHPST PRTS P Rigged up to lest seal assembly, 14,134.0 14,134.0 02:15 03:00 closed annular, opened kill, pressured up to 1100 psi and held 10 -min, and pumped 44 strokes total. Test good. Rigged down test equipment. Pressure test recorded and charted. 7/19/2019 7/19/2019 0.50 PROD2 WHPST WPST P Obtained milling parameters without 14,134.0 14,120.0 03.00 03:30 pumps; pick up weight 170k, down weight 133k. Pumps on at 275 gpm with 1,505 psi and 13% flow out; Pick up weight 166k, Down weight 132k, rotating weight 15k with 5,000 fUlbs. Tagged window at 14,120' MD. Page 38158 Report Printed: 811212019 seddlil Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Time End Time Dur (no Phase Op code Activity Code Time P -T -X O p ,ration nt(ftKB)De Start Depth EM Depth (flKB) 7/19/2019 7/19/2019 8.50 PROD2 WHPST WPST P Milled window as BOT Rep and 14,120.0 14,140.0 03:30 12:00 schedule from 14,120'to 14,140' MD at 275 gpm and 1,527 psi. rotating between 60-100 rpms with 5-11,000 ft/lbs. torque and 13% flow out. Pumped High-Visc sweep at 14, 125' MD and again at 14,133' MD. Total fluid loss last 12hrs. 0.0 bola, O.A. pressure 10.0 psi. 7/19/2019 7/19/2019 1.50 PROD2 WHPST WPST P Continued to mill as per BOT and 14,140.0 14,148.0 12:00 1330 milling schedule from 14,140'to 14,148' at 275 gpm with 1,527 psi. rotating at 100 rpms between 5 and 11,000 it/lbs torque. 13% flow out, Rotating weight 150k, again pumping a High-Visc sweep at 14,143' MD. 7/19/2019 7/19/2019 1.00 PROD2 WHPST WPST P Dressed window as per BOT rep from 14,148.0 14,129.0 13:30 14:30 14,148'to 14,129' MD at 100 rpms with torque running between 4 and 8,000 ft/lbs. while pumping 275 gpm at 1,435 psi moving through the window with three passes. With pumps off and no rotation, pass through window without issue. Window deemed cleaned and polished. Pick up weight 178k down weight 131k. 7/19/2019 7/19/2019 1.50 PROD2 WHPST TRIP P TOOH, broke double #148 from string 14,129.0 14,010.0 14:30 16:00 and picked up signal in mouse hole and racked back in derrick. Circulated bottoms up above Whipstock from 14,110'to 14,010' MD at 275 gpm and 1,340 psi. Pick up weight 177k down weight 131 k. Total strokes pumped 4,628. 7/19/2019 7/19/2019 0.50 PROD2 WHPST OWFF P Observed well for flow - Well Static. 14,010.0 14,010.0 16:00 16:30 7/19/2019 7/20/2019 7.50 PROD2 WHPST TRIP P Tripped out of hole from 14,010'to 14,010.0 146.0 16:30 00:00 13,924' MD on elevators. Pick up weight 178k down weight 130k. With pumps on at 275 GPM and 1,345 psi at 150 ft per hr. logged RATag for final confirmation, continued to pull out of hole, confirmed RA tag at 13,884.5' MD. SLB Logged placed in well file. Continued to trip put of hole from 12, 785' to 146' MD while filling over hole and monitoring fluid loss in Pit #2. Held PJSM for laying down Baker BHA. Total losses over last 12 his. - 15.1 bbls. O.A. pressure 10 psi 7/20/2019 7/20/2019 2.50 PROD2 WHPST BHAH P Laid down Baker milling BHA as per 146.0 0.0 00:00 02:30 Rep. Cleaned magnets, and managed tools going back in hole with SLB BHA. Manually strapped pits before and after BHA removal. Cleared and cleaned rig floor. 7/20/2019 7/20/2019 0.50 PROD2 WHPST SVRG P Rigged up wash tool and RIH to clean 0.0 0.0 02:30 03:00 BOP'S. Reciprocated pipe with pumps on from top of Tubing spool to the top of annular. Serviced blocks, Top Drive, and ST80. Page 39/58 ReportPrinted: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stall Depth Stall Tim End rime Dur (no Phase Op GDde Adfty Code Time P-T-X Operation (WS) End Depth (flKB) 7/20/2019 7/20/2019 2.00 PROD2 WHPST BHAH P Performed PJSM with SLB for picking 0.0 734.4 03:00 05:00 up BHA. Made up drilling motor and BHA as per approved detail. Scribed motor as per SLB D/D. Reset Totco depth to 734.4' MD. Continue to flow over hole while monitoring fluid returns in pit 2. 7/20/2019 7/20/2019 1.00 PROD2 WHPST TRIP P Tripped in hole on elevators from 734' 734.4 2,351.0 05:00 06:00 to 2,351' MD while monitoring fluid displacement in pit 2. Manually strapped every 5 stands. Performed shallow MWD test at 1,500' while pumping 222 gpm with 715 psi. Pick up weight 75k, down weight 69k at 1,500' MD. 7120/2019 7/20/2019 6.00 PROD2 WHPST TRIP P Continued to trip in hole from 2,351' to 2,351.0 12,880.0 06:00 12:00 12,880' MD while monitoring fluid displacement in pit 2 with constant hole fill. Continued to strap every 5- stands, and filling pipe every 20. Pick up weight 152k, down weight 112k. Total fluid loss f/last 12-hrs. 0 bbls. O.A. pressure 0.0 psi. 7/20/2019 7/20/2019 0.50 PROD2 WHPST TRIP7'— Continued to trip in hole from 12,880' 12,880.0 13,755.0 12:00 12:30 to 13,755' MD while monitoring fluid displacement in pit 2. Continued hole fill and manually strapping every 5- stands and filling pipe every 20. Pick up weight 1523k down weight 112k. 7/20/2019 7/20/2019 1.00 PROD2 WHPST TRIP P Picked up stand #142 and tripped in 13,755.0 13,884.0 12:30 13:30 hole with 250 gpm at 1,510 psi and logged RA tag. Tagged RA at 13, 884' MD as per MWD. Reset bit depth/confirmed with MWD. Orient motor as per SLB rep. Pick up weight 155k down weight 130k, pick up weight 152k down weight 112k. 7/20/2019 7/20/2019 4.50 PROD2 WHPST DRLG P Continued to RIH to 14,148' and 13,884.0 14.175.0 13:30 18:00 started control drilling to 14,175' MD at 7,444 TVD at 270 gpm and 1,750 psi with 14% flow out. 5-12k weight on bit, Pick up weight 155k down weight 130k rotational 125k, and 4-8k Polbs. torque. Controlled drilling from 14,175' to 14,198' MD at 60 rpms 8k ft/lbs. Continued to monitor fluid displacement in pit 2 and calling out tossestgains every 5 stands. Actual Slide Time - 1.64 /Actual Drilling Time -2.01 /Actual Bit Time -2.01 /Actual Jar Time -133.43 7/20/2019 7/20/2019 5.50 PROD2 WHPST DRLG P Continued to control drill 6.5" kick-off 14,175.0 14,323.0 18:00 23:30 as per SLB rep from 14,175'to 14,323' MD, 7,459' TVD at 270 gpm at 1,750 psi. 10 to 20klbs weight on bit with 14% flow out. Pick weight 180k down weight 135k. Rotation weight 147k, and 4-8k ft/Ibs. torque. Took MWD survey as per SLB, verified position. Separation parameters: 8.3' center to center at 14,275' MD; 12.3' center to center at 14,323' MD. total length drilled from kick-off - 175'. Picked up off bottom and OWFF for 10-min. Well Static. Actual Slide Time-2.891 Actual Drilling time-4.11 /Total bit hours —6.12 / Total jar hours — 137.54. Page 40158 Report Printed: 81121'2019 Operations Summary (with Timelog Depths) AM C D5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Start Time Eml Time Our(hr) Phase Op Code Advity Code Time P -T -X Operation (ftKB) Ertl Depth(ftKB) 7/20/2019 7/21/2019 0.50 PROD2 WHPST TRIP P Picked up off bottom on elevators from 14,323.0 14,040.0 2330 00:00 14,323' to 14,040' MD and monitored hole fill in pit #2. Pick up weight - 180k down weight— 135k. Continued to pull out of hole and through window without rotation. Observed slight overpull between 3-5k on blocks. O.A. pressure at 21:00 — 220 psi / fluid loss over last 12hrs — 0.0 bbls. 7/21/2019 7/21/2019 6.00 PROD2 WHPST TRIP P Continued to trip out of hole from 14,040.0 2,000.0 0000 06:00 14,404'to 2,000' MD while monitoring hole fill and fluid displacement in pit #2. Continued to manually strap every 5 -stands, continue to cull DP for bent and damaged wear bands. Laid down 4-Jts. Pick up weight 90k down weight 85k at 2,000' MD. 7/21/2019 7/21/2019 1.00 PROD2 WHPST TRIP P Continued top trip out of hole from 2,000.0 360.0 06:00 07:00 2,000' to 360' MD while monitoring hole over and fluid displacement in pit #2. continued to manually strap every 5-syands. Pick up weight 60k down weight 45k. 7/21/2019 7/21/2019 0.25 PROD2 WHPST OWFF P Observed well for flow for 15 -min. Well 360.0 360.0 07:00 07:15 Static 7/21/2019 7/21/2019 2.00 PROD2 WHPST BHAH P Laid down BHA#7 as per SLB rep. 360.0 0.0 07:15 09:15 Cleaned magnets and continued to lay clown assembly. 7/21/2019 7/21/2019 1.50 PROD2 WHPST CLEN P Cleared, and clean rig floor pulled 0.0 0.0 09:15 10:45 wear bushing and installed BOP test plug. 7/21/2019 7/21/2019 4.25 PROD2 WHDBOP BOPE P Tested BOPE equipment 250 Low/ 0.0 0.0 10:45 15:00 3,500 High 5 min each. (All tests passed and charted with first time pass rate.) Tests were conducted using both the 4.0" and 4.5" on all rams and annular preventer. Tested annular and the 2-7/8 x 5-1/2" VBRs in UPR and LPR, Chokes Valves 1-15, Manual and Super Choke, Choke and HCR manual and HCRs, 4" valve on kill line, 4" FOSV, 4" Dart, Upper and Lower IBOP. Manual and Super Choke tested to 2,000 psi for bleed and hold pressure. Koomey drawdown test, accumulator 3000 psi, manifold 1500 psi. Post functioning the accumulators read 1700 psi with 18 - seconds for 200 psi build (2 electric pumps, 88 sec for full build both electric pumps and 2 air pumps. 6 Nitrogen bottle Average 1950 psi. Closing times: Annular 23 -seconds, UPR 21 -seconds, Blind/Shear Rams 16 -seconds, LPR 17 -seconds, Choke HCR 2 -seconds, Kill HCR 2 -seconds. Test Pit and Trip tank gain/loss alarms, Flow Out high Alarm, Tested H2S/CO2 alarms without issue. Witness waived by AOGCC Representative Matt Hererra 7/20/2019 at 12:50. Page 41/58 Report Printed: 811212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Depth Start Time End Time Wr(hr) Phase Op Code Activity Code Time P -T -X Operation dtKB) End Depth ptKB) 7/21/2019 7/21/2019 1.75 PROD2 WHDBOP BOPE P Rigged down BOPE test equipment, 0.0 0.0 15:00 16:45 pulled test plug and installed wear bushing as per FMC rep. W/B I. D. 6- 875". Removed master bushings in rotary and installed PS -21 slips, prepared rig floor BHA #8 7121/2019 7/21/2019 1.25 PROD2 DRILL BHAH P Performed PJSM for BHA handling. 0.0 148.0 16:45 18:00 Picked up SLB BHA #8 as per detail from to 146' MD. Monitored hole 811 on pit 3. Pick up weight 50k down weight 48k 7/21/2019 7/21/2019 1.25 PROD2 DRILL BHAH P Continued to PU BHA#8 from 148' to 148.0 343.0 1800 19:15 343' MD Tripped in hole with HWDP. Changed over to PS -21 pipe slip assembly 7/21/2019 7/22/2019 4.75 PROD2 DRILL TRIP P Tripped in hole on elevators from 343' 343.0 9,370.6- ,370.019:15 19 15 00:00 to 1,500' MD while monitoring fluid displacement in pit #3. Pick up weight 55k down weight 52k at 400' MD. Performed MWD shallow hole test as per SLB DID. Pumped at 240 gpm with 1,010 psi. Tool communication verified. Continued to TIH from 1,500' to 9,370' MD while displacing pipe every 20 stands with 9.0 ppg FloPro. Continued to manually strap returns every 5 -stands. 7/22/2019 7/22/2019 3.00 PROD2 DRILL TRIP P Continued to trip in hole on elevators 9,370.0 13,836.0 00:00 03:00 from 9,370' MD to 13,836' MD filling pipe every 20 stands with 9.0 ppg FloPro. Continued to strap fluid displacement every 5 -stands. 7122/2019 7/22/2019 1.00 PROD2 DRILL MPDA P Performed PJSM with MPD rep for 13,836.0 13,836.0 03:00 04:00 installation of RCD bearing. OWFF for 10 -min, Well Static. Removed trip nipple, installed bearing. Observed 7k drag while pushing DP through new bearing. 7122/2019 7/22/2019 1.00 PROD2 DRILL SVRG P Performed PJSM for hanging blocks 13,836.0 13,836.0 04:00 05:00 and slip/cut drill line. Slipped and cut 110' of line, cleaned and cleared tools, disregarded old line, and calibrated blocks in Amphion. 7/22/2019 7/22/2019 1.00 PROD2 DRILL TRIP P Continued to trip in hole on elevators. 13,836.0 14,026.6- 05:00 06:00 Picked up stand #144, logged RA tag as per SLB DID Rep. Pumped 245 gpm with 1,935 psi. Pick up weight 187k down weight 119k. RA survey confirmed 13, 884' MD. Continued to trip in hole through window, experienced no drag, shot survey. 7/22/2019 7/22/2019 1.00 PROD2 DRILL TRIP P Washed and reamed from 14,026' to 14,026.0 14,323.0 06:00 0700 14,323' MD while rotating at 40 rpms, 6k fl/lbs. torque, at 245 gpm with 1,905 psi. Experienced 7% flow out. Began displacing well from 9.7 Brine with 9.0 FloPro as per schedule. Page 42/58 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) CDS-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Depth Slav rime End Time Our (hr) Phase Op Corte Activity Code Time P-T-X Opera lon (ftKB) End Depth (flKB) 7/22/2019 7/22/2019 5.00 PROD2 DRILL DDRL P Began drilling 6.5" production hole 14,323.0 14,826.0 07:00 12:00 from 14,323'to 14,826' MD, TVD 7,433' with 15k weight on bit, 257 gpm at 2,110 psi on, 950 psi off. 150 rpms torque on 8k ft/lbs., off 7k FtAbs. with a 7% flow out. Pick up weight 192k, down weight 112k, and rotating weight 137k. Actual drilling time 4.12 hrs. / Total bit hrs. 5.99 / total jar hrs. 141.66. Completed displacement to 9.0 ppg FloPro @ 07:45, Total strokes pumped 4,385. (SPR @ 14,404' MD, 7,487' TVD: (MP-1 20/30 SPM = 420/660 psi) / (MP-2 20/30 SPM = 460/680 psi)) 7/22/2019 7/22/2019 4.50 PROD2 DRILL DDRL P Continued to drill 6.5" production hole 14,826.0 15,047.0 12:00 16:30 from 14,826'to 15,047' MD, 7,531' TVD. Weight on bit from 14-20k lbs. at 257 gpm with 2,050 psi on, 2,095 psi off. 120 rpms torque on 13k ft/lbs., torque off 81k ft/Ibs. with 11% flow out. Pick up weight 196k down weight 115k rotating weight 141k. actual drilling time 3.5 hrs. Total bit hrs. 7.68, Total jar hrs. 144.78. 7/22/2019 7/22/2019 1.50 PROD2 DRILL CIRC T Rotated and reciprocated from 15,047' 15,047.0 14,970.0 1630 18:00 to 14,970' MD, troubleshot MWD tools as per SLB. Rotating between 30-160 rpms, 6-11 k ft/lbs. and pumping between 225-257 gpm with 1,690 to 2,110 psi. Observed 12% flow out. 7/22/2019 7/22/2019 2.50 PROD2 DRILL CIRC T Continued to troubleshoot MWD from 14,970.0 14,970.0 1800 20:30 14,970'to 14,882' MD. Performed multiple downlinks established communication and performed test as per SLB rep. Reamed back to bottom and continued drilling forward from 15,047' MD. 7/22/2019 7/23/2019 3.50 PROD2 DRILL DDRL P Continue to drill from 15,047 to 15,047.0 15,720.0 20:30 00:00 15,720' MD at 7,439' TVD. Weight on bit 14-20klbs, with 255 GPM and 2,260 psi on and 2,180 psi off. Rotating at 130 rpms with 12kft/Ibs. torque on and 8kfl/lbs. torque off. Observed flow out at 11%. Pick up weight 191 k down weight 118k and rotating weight at 148k. Actual drilling time 3.74, Total bit hrs. 11.02, Total Jar Hrs. 148.56. O.A. Pressure at 23:00 was recorded at 320 psi, Fluid losses from the last hrs. 0.0 bbls. 7/23/2019 7/23/2019 5.50 PROD2 DRILL DDRL P Continue to drill from 15,720'to 15,720.0 16,506.0 00:00 05:30 16,506' MD at 7,436' TVD. Weight on bit 14-20klbs, with 245 GPM and 2,240 psi on and 2,195 psi off. Rotating at 120 rpms with 11 kft/lbs. torque on and 8kft/Ibs. torque off. Observed flow out at 11%. Pick up weight 198k down weight 117k and rotating weight at 156k. Actual drilling time 4.25, Total b8 hrs. 15.27, Total Jar Hrs. 152.81. 7/23/2019 7/23/2019 0.50 PROD2 DRILL SVRG P Serviced rig, greased wash pipe, 16,506.0 16,506.0 05:30 06:00 1 I I greased and serviced the PS-21 slips, inspected hydraulic hoses Page 43158 ReportPrinted: 8/1212019 e Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log smn Depm Stan Time End Time Our (hr) Phase Op Code AddvM Code Time PJA Operation (ftKB) End Depth (WB) 7/23/2019 7/23/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 16,506' to 16,506.0 17,349.0 0600 12:00 17,349' MD, 7,446' TVD. Weight on bit 14-20kfl/Ibs. at 245 GPM and 2,447 on and 2,195 psi off. Rotating at 150 rpms with 11 kft/lbs torque on and 8kff/lbs torque off. Observed flow out at 11%. Pick up weight 198k down weight 117k and rotating weight 1561k. Actual drilling time 4.02 hrs. Total bit hrs. 21.08, Total Jar time 156.75 hrs. > SPR's at 16,683' MD; FloPro — 9.1 ppg MP #1- 30/40 SPM — 940 / 1,240 psi MP #2 - 30/40 SPM — 920 / 1,160 psi O.A. Pressure 360 psi / Losses over last 12hrs. — 0.0 bbls. 7/23/2019 7/23/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 17,349'to 17,349.0 17,690.0 12:00 18:00 17,690' MD, 7,545' TVD. Weight on bit 14-20kf tlbs. at 255 GPM and 2,705 on and 2,695 psi off. Rotating at 150 rpms with 12kf tlbs torque on and 8kft/Ibs torque off. Observed flow out at 11%. Pick up weight 195k down weight 108k and rotating weight 143k. Actual drilling time 1.42 hrs. Total bit hrs. 22.05, Total Jar time 158.17 hrs. 7/23/2019 7/24/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 17,690'to 17,690.0 18,197.0 18:00 00:00 18,197' MD 7,477' TVD. Weight on bit 14-20kft/Ibs at 255 GPM and 2,515 psi on and 2,690 psi off. Rotating at 120 — 150 rpms with 10-12kft/Ibs torque on and 7kft/lbs torque off. Observed flow out at 11 %. Pick up weight 193k down weight 106k, rotating weight 146k. Actual drilling time 4.14 hrs. Actual bit hrs. 28.66, Actual Jar time 164.33 hrs. O.A pressure at 22:30 560 psi Fluid loss over last 12hrs 11 WIS. > SPR's at 17,539' MD; FloPro-9.0 ppg MP #1- 30/40 SPM — 1,160 11,400 psi MP #2 - 30/40 SPM — 1,100 / 1,460 psi 7/24/2019 7/24/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 18,197'to 18,197.0 18,798.0 00:00 06:00 18,798' MD, 7,475' TVD. Weight on bit 14-20k/lbs at 245 gpm with 2,710 psi on and 2,651 psi off. Rotating at 150 rpms with 12kff/Ibs torque on and 8kft/Ibs torque off. Observed 11 % flow out. Pick up weight 1951k Down weight 96k, rotating weight 140k. Actual drilling time 4.41 hrs. Actual bit time 33.07 hrs. and total Jar time 168.74 hrs. Note: Crossed Fault E1 at 18,396' MD without observing any significant fluid losses or gains. Page 44158 Report Printed: 811212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Deem startTime End Time Our (hr) Phase Op Code AdAty Code Time P -T -X Operation (flKB) End Depth (flKB) 7/24/2019 7/24/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 18,798'to 18,798.0 19,534.0 06:00 12:00 19,534' MD, 7,486' TVD. Weight on bit 18kllbs with 244 gpm and 2,753 psi on and 2,698 psi off. Rotating at 150 rpms with 121iNlbs torque on and 8kft/Ibs torque off. Observed flow out at 12%. Pick up weight 2021k down weight 85k rotating weight 140k. Actual drilling time 2.39 hrs. Total bit time; 35.46 hrs. Total Jar time 168.74 hrs. O.A Pressure at 07:00 — 500 psi. / Total fluid losses for lastl2hrs. 208 bbls > Time 04:20 SPR's at 18,583' MD, 7,478 TVD, MW — 9.0 FloPro >> MP41 20 / 30— 1,12011,350 psi >> MP42 20 / 30 — 1,160 / 1,360 psi 7/24/2019 7/24/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" from 19,534' to 19,534.0 20,247.0 1200 18:00 20,247' MD at 7,490' TVD. Weight on bit 15k/lbs with 254 gpm at 2,831 psi on and 2,796 psi off. Rotating at 150 rpms with 14kft/Ibs torque on and 8kft/lbs torque off. Observed 12% flow out. Pick up weight 200k down weight 97k, rotating weight 139k. Actual drilling time 4.31 hrs. Actual bit time 39.77 hrs. Total Jar time 177.31 hrs. 7/24/2019 7125/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 20,274'to 20,247.0 20,960.0 18:00 00:00 20,960' MD, 7,498' TVD. Weight on bit 15k/Ibs with 255 gpm and 2,880 psi on and 2,750 psi off. Rotating at 150 rpms with 15k f flbs torque on and 8k ft/lbs torque off. Observed 12% flow out. Pick up weight 21 Ok down weight 87k rotating weight 140k. Actual drilling time 3.92 hrs. Actual bit time 43.69 hrs. Total Jar time 181.23 hrs. O.A Pressure at 23:30— 480 psi / Total fluid losses for the last 12hrs. 480 bbls > Time 13:30 / SPR's at 19,720' MD, 7,490 TVD, MW — 9.0 FloPro >> MP41 30 140 — 1,380 / 1,600 psi >> MP42 30 140 — 1,360 / 1,640 psi > Time 23:301 SPR's at 19,720' MD, 7,490 TVD, MW — 9.0 FloPro >> MP41 30 / 40 — 1,380 / 1,600 psi >> MP42 30140 — 1,360 / 1,640 psi 7/25/2019 7125/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" from 20,960'to 20,960.0 21,720.0 00:00 06:00 21,720' MD at 7,492' TVD. Weight on bit 15k/lbs with 255 gpm at 2,880 psi on and 2,750 psi off. Rotating at 150 rpms with 15kft/lbs torque -on and Bkff/lbs torque -off. Observed 12% flow out. Pick up weight 210k/lbs down weight NIA rotating weight 142k/lbs. Actual drilling time 4.03 hrs. Actual bit time 49.95. Total Jar time 185.26 hrs. Page 45158 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Depth Start Time End Time Dur (hr) Phase Op Code Activity Code Time P -T -X Operation (ftKB) End Depm(ftKB) 7/25/2019 7/25/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" from 21,720'to 21,720.0 22,671.0 0600 12:00 22,671' MD at 7,481' TVD. Weight on bit 19k/lbs with 244 gpm and 2,880 psi on and 2,750 psi off. Rotating at 150 rpms with 19kftl/lbs torque -on and 10kft/lbs torque -off. Observed 12% flow out. Pick up weight 218olbs, down weight N/A, rotating weight 130k/lbs. Actual drilling time 3.88 hrs. Actual bit time 51.60 hrs. Total jar time 189.14 his > SPR's at 21,905' MD, 7,490 TVD MW -9.0 ppg FloPro / Time: 07:30 >> MP #1 — 20/30 1,300 psi / 1,540 psi >> MP #2 — 20/30 1,340 psi 11,540 psi > Fluid Gain/Loss in last 12hrs. 0.0 / 161 bbls > O.A. pressure: 500 psi. 7/25/2019 7/25/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" from 22,671'to 22,671.0 23,528.0 12.00 18:00 23,528' MD at 7,490 TVD. Weight on bit 18k/lbs with 244 gpm at 2,880 psi on and 2,750 psi off. Rotating at 150 rpms with 19kft/lbs torque on and 10kft/lbs torque off. Observed 12% flow out. Pick up weight 218k down weight N/A, rotating weight 130k. Actual drilling time 3.73 hrs. Actual bit time 57.20 hrs. Total Jar time 192.87 hrs. 7/25/2019 7/26/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" from 23,528'to 23,528.0 24,387.0 1800 0000 24,387' MD at 7,493' TVD. Weight on bit 18k/lbs with 245 gpm at 2,970 psi on and 2,960 psi off. Rotating at 150 rpms with 21 kf /lbs torque on and 12kft/lbs torque off. Observed 12% flow out. Pick up weight 211k down weight N/A, rotating weight 148k. Actual drilling time 3.61 hrs. Actual bit time 58.94 hrs. Total Jar time 196.48 hrs. SPR's at 24,000' MD, 7,490 TVD MW - 9,1+ ppg FloPro / Time: 21:30 MP #1 — 20/30 1,120 psi/ 1,360 psi MP #2 — 20/30 1,120 psi / 1,360 psi Fluid Gain/Loss in last 12hrs. 0.0 / 104 bbls O.A. pressure: 350 psi. at 23:00 7/26/2019 7/26/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" L1 from 24,387' 24,387.0 25,192.0 00:00 06:00 to 25,192' MD, 7,510' ND. Weight on Bit 16k/lbs at 245 gpm with 3,245 psi on and 3,035 psi off. Rotating at 120 rpms with 19kf /lbs torque on and 12kft/lbs off. Observed 12% flow out. Pick up weight 218k down weight 0.0, rotating weight 150k/lbs. Actual drilling time 4.06 hrs. Total Bit time 64.87 hrs. Total Jar time 200.54 hrs. Page 46158 Report Printed: 8/12/2019 ' Operations Summary (with Timelog Depths) d CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan DePdl Stan Time End7xne Da(hr) Phase op Code A ily Code Time P-T-X operallm (ftKB) EM Depth(ftKB) 7/26/2019 7/26/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 25,192'to 25,192.0 25,682.0 06:00 12:00 25,682' MD, 7,538' TVD. Weight on Bit 17ulbs at 245 gpm with 2,960 psi on and 2,770 psi off. Rotating at 100 rpms with 19kf /lbs torque on and 12kft/lbs off. Observed 12% flow out. Pick up weight 217k down weight 0.0, rotating weight 147k/lbs. Actual drilling time 4.09 hrs. Total Bit time 68.96 hrs. Total Jar time 204.63 hrs. > O.A Pressure at 10:00 - 260 psi > Total fluid losses for the past 12-hrs. 230 bbls 7/26/2019 7/26/2019 6.00 PROD2 DRILL DDRL P Continued to drill 6.5" Lt from 25,682' 25,682.0 26,385.0 1200-. 18:00 to 26,385' MD, 7,547' TVD. Weight on Bit 15k/lbs at 245 gpm with 2,990 psi on and 2,990 psi off. Rotating at 120 rpms with 19kf /lbs torque on and 14kff/Ibs off. Observed 12% flow out. Pick up weight 255k down weight 0.0, rotating weight 142k/lbs. Actual drilling time 3.78 hrs. Total Bit time 70.87 hrs. Total Jar time 208.41 hrs. 7/26/2019 7/26/2019 2.75 PROD2 DRILL DDRL P Continue to drill from 26,385' To 26,385.0 26,727.0 18:00 20:45 26,727' MD, 7,547' TVD. Bit Weight 15kfUlbs with 245 gpm and 2,990 psi on and 2,990 psi off. Rotating at 120 rpms with 19kf tlbs with torque on and 14kff/Ibs with torque off. Observed 12% flow out. Pick up weight 255k, Down weight 0.0 Rotating weight 142k. 7/26/2019 7/26/2019 2.75 PROD2 DRILL DDRL P At 26,727' MD Bit Stalled at 24kf tlbs 26,727.0 26,746.0 20:45 23:30 torque, with 570 psi pressure drop. Total fluid loss 184 bbl per hr. Continued to drill to 26,746' MD, picked up to 26,724' and rotated at 5 rpms with 14kfMbs off bottom at 42 GPM and 580 psi with 80% losses. Build and pumped one 37 ppb LCM pill and circulated, -2,750 strokes. Picked up to 26,735' and shut in choke and squeezed at 150 psi. for 8-mins. Bled pressure off backside and drilled remaining stand. Connection; adjusted back pressure to 340 psi which was unattainable and re-adjusted to 300 psi. Held 300 psi until connection break, Final back pressure recorded 267 psi upon connection MU. Found loss rate at 75 bbls per hour and continued to drill. 7/26/2019 7/27/2019 0.50 PROD2 DRILL DDRL P Continued to drill from 26 746'to 26,746.0 26,768.0 23:30 00:00 26,768' MD at 7,536' TVD. Weight on bit 12kft/Ibs at 255 gpm with 3,198 psi torque on and 3,100 psi torque off. Rotating at 100 rpms with 16kf flbs on and 13kf tlbs torque off. Flow out was 9%. Pick up weight 255k down weight 0.0 rotating weight 148k. Actual drilling time 2.72 hrs. Actual Bit time 73.59 hrs. Total Jar time 211.3 hrs. Total fluid losses from last 12-hrs. - 483 bbl. O.A. Pressure 150 psi at 23:30 Page 47/58 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depth Stars Time End Time our thin Phase Op Cotle Achvily Corte Time P -T -X Operation (XKB) End Depth(RKB) 7/27/2019 7/27/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 26,768'to 26,768.0 27,043.0 00:00 06:00 27,043' MD, 7,540' TVD. Weight on bit 15k/lbs with 255 gpm at 3,165 psi on and 3,102 psi off. Rotating at 100 rpms with 19kft/Ibs torque on and 14kfUlbs torque off. Observed flow out at 11%. Pick up weight 257k/lbs down weight 0.0, and rotating weight at 146k/lbs. Encountered stuck floats, pumped 30 bbl Hi/lo sweep to clear. Actual drilling time 2.29 hrs, Actual bit time 75.88 hrs. Total time on Jars, 213.42 hrs. 7/27/2019 7/27/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 27,043'to 27,043.0 27,815.0 06:00 12:00 27,815' MD, 7,550' TVD. Weight on bit 15k/lbs with 245 gpm at 3,065 psi on and 3,060 psi off. Rotating at 110 rpms with 12kf /lbs torque on and 14kf /lbs torque off. Observed flow out at 11 % Pick up weight 269k/lbs, down weight 0.0, and rotating weight at 143k/lbs. Max Gas observed at 10,877. Actual drilling time 3.94, Actual bit time 79.82 hrs. Total time on Jars, 217.36 hrs. SPR at 26,955' MD, 7,540 TVD. MW — 9.1 ppg Time: 04:30 MP #1 / Strokes @ 20 - 1,060 psi / @ 30 — 1,310 psi MP 42 / Strokes @ 20 - 1,060 psi / @ 30 — 1,290 psi Fluid losses reported f/last 12-hrs. 630 bbls O.A. Pressure — 120 psi @ 12:00 7/27/2019 7/27/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 27,815'to 27,815.0 28,577.0 12:00 1800 28,577' MD, 7,553' TVD, Weight on bit 13k/lbs with 255 gpm at 2,860 psi on and 2,880 psi off. Rotating at 120 rpms with 22kfUlbs torque on and 14kft/lbs torque off. Observed flow out at 11%. Pick up weight 284k/lbs down weight 0.0, and rotating weight at 146k/lbs. ECD's — 10.94 ppg. Actual drilling time 4.07, Actual bit time 83.76 hrs. Total time on Jars, 221.43hrs. Page 48158 ReportPrinted: 8/12/2019 Operations Summary (with Timelog Depths) r CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log start Depm Start Tome EM Time Dur(hr) Phase Op Core Activity care Time P -T -X Operadw (KKB) Er Depm(flKS) 7/27/2019 7/28/2019 6.00 PROD2 DRILL DDRL P Continued to drill from 28,577'to 28,577.0 29,166.0 18:00 00:00 29,166' MD, 7,559' TVD. Weight on bit 12-181k/lbs with 255 gpm at 3,255 psi on and 3,215 psi off. Rotating at 100 rpms with 22kR/lbs torque on and 14kit/lbs torque off. Observed flaw out at 11%. Pick up weight 284k/lbs down weight 0.0, and rotating weight at 148k/lbs. ECD's — 10.91 ppg. Actual drilling time 4.29, Actual bit time 88.18 hrs. Total time on Jars, 225.72hrs. SPR at 27,909' MD, 7,551 TVD. MW — 9.1 ppg Time: 12:40 MP #1 / Strokes @ 20 - 1,140 psi / @ 30 — 1,340 psi MP #2 / Strokes @ 20 - 1,120 psi / @ 30 —1,360 psi SPR at 29,050' MD, 7,558 TVD. MW — 9.1 ppg Time: 22:15 MP #1 / Strokes @ 20 - 1,120 psi / @ 30 — 1,380 psi MP #2 / Strokes @ 20 - 1,110 psi / @ 30 — 1,345 psi Fluid losses reported Mast 12-hrs. 620 bbls O.A. Pressure — 100 psi @ 22:30 Total Losses Reported F/MI-1,250 bola 7/28/2019 7/28/2019 8.00 PROD2 DRILL DDRL P Continued to drill the 6.5' production 29,166.0 29,480.0 00:00 08:00 hole from 29,166 to 29,480 MD at 7,663' ND. Weight on bit 1 Ok/lbs with 255 gpm at 3,330 psi on and 3,210 psi off. Rotating between 70-100 rpms with 22kftAbs torque on, and 14 torque off. Observed flow out at 10%. Pick up weight 257k1lbs down weight O.Ok/lbs, rotating weight 154kAbs. ECD's at 10.83 ppg, Max Gas 8,919 units. Actual drilling time — 94.80, Bit time — 96.67 hrs. and total Jar time — 232.34 hrs. 7/2812019 7128/2019 4.00 PROD2 CASING CIRC P Called TD at 29,480' MD. Racked one 29,480.0 29,342.0 08:00 12:00 stand back and circulated bottoms up. Reciprocated and rotated pipe at 29,342' MD at 255 gpm 13,250 psi and 60 rpms with torque at 17k/fts. ECD's 10.64 ppg, rotating weight 140k/lbs. SPR's @ 29,480' MD, 7,663' TVD MW 9.1 ppg at 08:10 MP41: 20/30-1,10011,320 psi MP42: 20/30— 1,080 / 1,320 psi Total losses for last 12-hrs. 475 bbls 7/28/2019 7/28/2019 2.00 PROD2 CASING CIRC P Continued to circulate bottoms up 29,342.0 29,437.0 12:00 14:00 while rotating and reciprocating pipe from 29,342'to 29,437' MD. Pump rate remained at 255 gpm at 60 rpms. Torque remained at 17kftlbs. Rotating weight 140k/lbs, ECD's at 10.64 ppg. Total strokes pumped — 17,448 each. 7/28/2019 7/28/2019 2.50 PROD2 CASING SIPS P Performed pore pressure test at 5 29,437.0 29,437.0 14:00 1630 rpms and rotating with 16kft/Ibs torque. Initial pressure 405 psi, after 19 cycles 253 psi, total returns - 54.75 bbls. Pore pressure was identified at 9.66 ppg. Page 49158 Report Printed: 811212019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Time End Time Our(hr) Phase Op Code Anvity Code Time P-T-X Operation Slant Depth (ftKB) End Depth rtKB) 7/28/2019 7/28/2019 1.50 PROD2 CASING BKRM P Continued to circulate in efforts to 29,437.0 29,342.0 16:30 18:00 remove gas while back reaming from 29,437' to 29,342' MD at 255 gpm and 60 rpms with 17kft/lbs of torque. Rotating weight 140k/lbs. ECD's were 10.64 ppg. Dropped 2.36" hollow drift with 110'tail in stand 305. 7/28/2019 7/28/2019 4.50 PROD2 CASING BKRM P Continued to circulate out gas while 29,342.0 29,246.0 18:00 22:30 back reaming from 29,342'to 29,246' MD. Set up and pumped through gas buster at 170 gpm with 1,725 psi and 40 rpms. Swapped back to flow line after 10,000 strokes with only 1,200 gas units observed. Continued to back ream out of hole pulling 600 ft/hr. while pumping 255 gpm at 3,000 psi. Held 280 psi with MPD. Max torque observed 18k ft/lbs. rotating weight 161 k/lbs. down weight-0.0k. 7/28/2019 7/29/2019 1.50 PROD2 CASING BKRM P Continued to back ream from 29,246' 29,246.0 28,550.0 22:30 0000 to 28,550' MD. Observed gas increase peaking at -8,000 units. Re-routed returns to gas buster and circulated gas out while holding 380 psi on MPD. Total losses reported - 195 bbls. 7/29/2019 7/29/2019 6.00 PROD2 CASING BKRM P Continued to back ream from 28,550' 28,550.0 26,481.0 00:00 0600 to 26,481' MD with 255 gpm at 2,800 psi and 11% flow out while rotating at 80 rpm with 15k/lbs torque. Rotating weight 152k. Maintaining back pressure at 380 psi, equivalent to 10.0 ppg 7/29/2019 7/29/2019 3.50 PROD2 CASING BKRM P Continue to back ream from 26,481'to 26,481.0 24,955.0 06:00 0930 24,955' MD with 255 gpm at 2,800 psi with 12% flow out. ECD's were 10.22 ppg while rotating at 75 rpms with 10k/lbs of torque. Rotating weight 147k, pick up weight 220k/lbs, Down weight remains at 0.0 lbs. 7/29/2019 7/29/2019 2.50 PROD2 CASING CIRC P Circulated bottoms up while 24,955.0 24,876.0 09:30 1200 reciprocating from 24,995'to 24,876' MD at 255 gpm and 2,800 psi. Observed 12% flow out with 10kNlbs torque. Rotating weight remained at 147k/lbs with an ECD of 10.16. Total Fluid loss over the last 12-hrs. 185 bbls. O.A. pressure at 07:00 / 120.0 PSI. 7/29/2019 7/29/2019 1.00 PROD2 CASING CIRC PContinued to circulate bottoms up 24,876.0 24,864.0 12:00 1300 while reciprocating from 24,876'to 2, 864' MD at 255 gpm and 2,800 psi. Observed flow out at 12% while rotating at 75 rpms with 10kf /lbs of torque. ECD's were observed at 10.13 ppg. Pick up weight 147k/lbs. Page 50/58 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stag Time End Time our (hr) Phase Op carie Actively CDda Time P -T -X Operation SWit Depth (10K8) End DepM (flKB) 7/29/2019 7/29/2019 4.50 PROD2 CASING DISP Displaced 9.1 ppg FloPro to 10.0 24,864.0 24,864.0 13:00 17:30 Brine, pumped a 25 bbls of high -Vis spacer while reciprocating from 24,959'to 24,864' MD at 255 gpm. Initial circulating pressure was 2,400 psi at 240 gpm with a final circulating pressure of 2,170 psi. Observed 12% flow out at 75 rpms and 10kftAbs of torque. Rotating weight 147k. Pick up weight 2191k/Ibs, down weight 83k/lbs and final rotating weight 150k/lbs with torque increasing to 14kfUlbs. 7/29/2019 7/29/2019 2.00 PROD2 CASING OWFF Monitored well for flow, SIMOPS 24,864.0 24,864.0 17:30 19:30 Serviced Equipment on dg floor. 729/2019 7/30/2019 4.50 PROD2 CASING SMPD Stripping out of hole as per MPD 24,864.0 22,295.0 19:30 00:00 schedule / Rep from 24,864' to 22,295' MD while maintaining back pressure in slips and utilizing mud pump 1 at 40 strokes per min as per detailed pressure / depth chart. Manually strapping trip tank every 5 stands Pick up weight 134k/lbs down weight remains at 84k/lbs. Total losses for the last 24-hrs 310 Wis. Average loss during stripping —17 bbls per 5 - stands. O.A. pressure at 23:30 — 80 psi SPR's at 24,947' MD, 7,500' TVD, MW 10.0 ppg, Time -23:30 MP41: 20 130 — 480 psi 1780 psi MP -#2: 20 130 — 440 psi 1720 psi 7/30/2019 7/30/2019 7.00 PROD2 CASING SMPD P Strip out of hole from 22,295' MD to 22,295.0 17,921.0 00:00 07:00 17,921' MD, Laid down 61 doubles to pipe shed tubs.. Re -shoot survey @ 18,676' for SLB. P/U=240k, S/0=941k. 7/30/2019 7/30/2019 3.00 PROD2 CASING SMPD P Continued to strip out of the hole from 17,921.0 14,692.0 07:00 10:00 17,921' MD to 14,692' MD with 4" DP. Racked back DP in Derrick. P/U=218k, S/0=109k. Monitored displacement on pit #3. 7/302019 7/30/2019 2.50 PROD2 CASING CIRC P CBU while reciprocating from 14,692' 14,692.0 14,692.0 10:00 12:30 MD to 14,597' MD. GPM = 240, SPP=1,700 psi, RPM = 120, Torque = 8K, ROT=143, Max Gas = 987 units. 7/30/2019 7/30/2019 1.00 PROD2 CASING SMPD P Strip out of hole from 14,692 MD to 14,692.0 14,042.0 12:30 13:30 14,042' MD, Racked back DP in Derrick. P/U=207k, S/0=113k. Monitored displacement on pit #3. No excess drag when pulling BHA through window. 7/30/2019 7/30/2019 1.00 PROD2 CASING SLPC P Slipped and cut 157' of drill line (20 14,042.0 14,042.0 13:30 14:30 wraps). Serviced top drive, blocks, draw works, SIMOPS, monitored well on pits #2, and #3. 12 We breathe back. 7/30/2019 7/30/2019 3.50 PROD2 CASING SMPD P Strip out of hole from 14,042' MD to 14,042.0 7,375.0 14:30 18:00 7.375' MD, Racked back DP in Derrick. P/U=118k, S/O=82k. Monitored displacement on pit #3. Page 51158 ReportPrinted: 8/1 212 01 9 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Time End Time D, (m) Phase Op Code Activity Code Time P -T -X Operation Start Depth (MB) End Depth(ftKB) 7/30/2019 7/30/2019 5.25 PROD2 CASING SMPD P Strip out of hole from 7,375' MD to 7,375.0 532.0 18:00 23:15 532' MD, Racked back DP in Derrick. P/U=110k, S/0=74k @ 5,000' MD. Monitored displacement on pit #3. Encountered severe tool joint wear on some connections at 7,000' MD. L/D 4 singles to the pipe shed. Observed overtorqued connections with rig tongs. B/O torque=54k. 7/30/2019 7/31/2019 0.75 PROD2 CASING OWFF P OWFF through MPD. Shut in choke to 532.0 532.0 23:15 0000 verify pressure drops every 15 minutes. Reduced ballooning flow trend was observed after each choke shut in sequence. Estimated cumulative bleed back of -22 bbls (8 bph) at 7/31/2019 00:00. SIMOPS - Cleaned and cleared rig floor, prepped tools for RCD bearing swap, prepped tools for laying down BHA #8 w/ SLB. Held a PJSM prior to changing out RCD bearing to trip nipple. 7/31/2019 7/31/2019 6.50 PROD2 CASING OWFF P OWFF through MDP. Shut in choke to 532.0 532.0 00:00 06:30 verify pressure drops every 15 minutes. 7/31/2019 7/31/2019 1.00 PROD2 CASING MPGA P Pulled RCD bearing and installed trip 532.0 532.0 06:30 07:30 nipple as per MDP representative. Hooked up jet pump line, purged system, and verified mud fill. 7/31/2019 7/31/2019 2.50 PROD2 CASING BHAH P POOH from 532' MD to 343' MD. 532.0 0.0 07:30 10:00 Racked back one stand and laid down two singles to in the pipe shed. Changed out jars for one joint of HWDP Racked back two stands of HWDP in preparation for the subsequent liner run. UD BHA#8 as per SLB DD. The bit was observed to be ringed out. 7/31/2019 7/31/2019 1.00 COMPZ2 CASING BHAH P Cleaned and cleared rig floor of all 0.0 0.0 10:00 11:00 j non essential tools and equipment. 7/31/2019 7/31/2019 1.50 COMPZ2 CASING PUTB P Rigged up to run 4-1/2" liner as per 0.0 0.0 11:00 12:30 Doyon casing. 7/31/2019 7/31/2019 5.50 COMPZ2 CASING PUTB P Held PJSM. RIH to 5,500' MD with 4- 0.0 5,500.0 12:30 18:00 1/2" 12.6 ppf L-80 H563 liner as per planned tally. UW = 86k, DW = 78k, and monitored displacement via pit #2. 7/31/2019 8/1/2019 6.00 COMPZ2 CASING PUTB P RIH w/ 4-1/2" 12.6 ppf L-80 H563 liner 5,500.0 12,580.0 18:00 00:00 with spaced out ported joints from 5,500' MD to 12,580' MD. PIU = 98k, S/O = 82k. Maintained constant hole fill and manually strapping trip pit every 10 joints. 8/1/2019 8/1/2019 1.00 COMPZ2 CASING PUTB P RIH w/ 4-1/2" 12.6 ppf L-80 H563 liner 12,580.0 12,643.0 00:00 01:00 with spaced out ported joints from 12,580' MD to 12,643' MD. PIU - 150k, S/O = 98k. Maintained constant hole fill and manually strapping trip pit every 10 joints. 8/1/2019 8/1/2019 0.50 COMPZ2 CASING PUTB P PJSM. P/U and M/U BOT Liner 12,643.0 12,643.0 01:00 01:30 Setting Sleeve. Torqued to 3,800 ftlbs. Changed out handling equipment to 4". Page 52158 Report Printed: 8/1 212 01 9 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Time EW Time Dur(hr)Phase Op Code Activity CWe Time P4 -X Operation Stan Depth (rt KB) EM Depth (flKB) 8/1/2019 8/1/2019 1.50 COMPZ2 CASING RUNL P RIH with liner on 4" DIP from 12,643' 12,643.0 14,003.0 01:30 03:00 MD to 12,765' MD. Established circulation. 1 bpm/60 psi, 2 bpm/80 psi, and 3 bpm/154 psi. Continued to RIH from 12,765' MD to 14,003' MD. Obtained base line torque and drag data prior to entering open hole: 1 bpm/62 psi 2 bpm/84 psi Torque at 10 RPM = 8.5 kftlbs Torque at 20 RPM = 9.0 kftlbs P/U Weight = 167 kftlbs @ 1 bpm S/O Weight = 107 kftlbs @ 1 bpm 8/1/2019 8/1/2019 3.00 COMPZ2 CASING RUNL P RIH from 14,003' MD to 18,560' MD. 14,003.0 18,560.0 03:00 06:00 Observed 3k through the window. Constant hole fill. Manually strap trip pit every 5 stands. P/U = 195 klbs, & S/O = 92 kibs. 8/1/2019 8/1/2019 6.00 COMPZ2 CASING RUNL P RIH from 18,560' MD to 24,367' MD. 18,560.0 24,367.0 06:00 12:00 P/U = 232 klbs, & S/O = 80 klbs. Monitored displacement with pit #2. 8/1/2019 8/1/2019 6.00 COMPZ2 CASING RUNL P RIH from 24,367' MD to 26,742' MD. 24,367.0 26,787.0 12:00 18:00 Rotated liner from 26,742' MD to 26,787' MD. Rotating weight = 134 kbls, 10 RPM, and Torque= 14.5 kftlbs. Monitored displacement with pit #2. 8/1/2019 8/1/2019 3.00 COMPZ2 CASING RUNL P Rotated liner from 26,787' MD to 26,787.0 26,825.0 18:00 21:00 26,851' MD at 10 rpm (P/U = 248 klbs). Picked up to a setting depth of 26,825' MD. Dropped 29132" phenolic ball and pumped it down at 3 bpm (SPP 478 psi) for 800 strokes. Reduced the pump down rate to 1.5 bpm (SPP 175 psi) until the ball finally seated at 1178 strokes. Pressured up to 3,000 psi. Lowered the string till the hookload reached 88 kllbs. Picked up to release and disengage from the liner. Pressured up to 4,572 psi and blew the ball with the test pump. Verified release of the running tool from the 4 1/2" liner. L/D single joint of DP and racked back one stand of OR P/U = 198 klbs, & S/O = 135 klbs. 8/1/2019 81112019 1.75 COMPZ2 WELLPR CIRC P Circulated a total of 4,600 strokes @ 4 14,000.0 14,000.0 21:00 22:45 bpm (SPP 530 psi & 5% flow). 8/1/2019 811/2019 0.50 COMPZ2 WELLPR CIRC P Recorded slow pump rates at 14,000' 14,000.0 14,000.0 22:45 23:15 MD (MW=10 ppg) Mud Pump #1 20 spm = 210 psi 30 spm = 360 psi Mud Pump #2 20 spm = 230 psi 30 spm = 370 psi 8/1/2019 8/212019 0.75 COMPZ2 WELLPR OWFF P OWFF @ 14,000'. Found well to be 14,000.0 14,000.0 23:15 00:00 flowing at 2.6 bph. Continued monitoring the well for flow. Observed flow back every 15 minutes. Rates gradual declined to 1.8 bph. 8/2/2019 8/2/2019 2.75 COMPZ2 WELLPR OWFF P OWFF. Conducted breathing test. 14,000.0 14,000.0 00:00 02:45 Verified shut in pressure reduction. 8/2/2019 8/212019 0.25 COMPZ2 WELLPR CIRC P Pumped 100 bbls (10.2 ppg) slug at 4 14,000.0 14,000.0 0245 03:00 bpm with SPP 500 psi. P/U =195 klbs. Page 53158 Report Printed: 8/12/2019 Uperations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stan Time End Time our ft) Phase Op Code Acaviry Code Time P-T-X Operabon Stan Dept (kKB) End Dept (111<8) 8/2/2019 8/2/2019 3.00 COMPZ2 WELLPR TRIP P POOH with 4" DP from 14,000' MD to 14,000.0 9,900.0 03:00 06:00 13,489' MD. LID 24 joints of 4" HWDP from 13,489' MD to 13,394' MD. Resumed POOH from 13,394' MD to 9,900' MD.. PIU = 130k, and SIO = 91 k. 8/2/2019 812/2019 4.50 COMPZ2 WELLPR TRIP P POOH from 9,900' MD to 5,537' MD 9,900.0 5,537.0 06:00 10:30 with 4" DP (Racked stands back in derrick). UW = 100k and DW = 85k. 8/2/2019 8/2/2019 0.50 COMPZ2 WELLPR OWFF P OWFF (Static) for 30 minutes, slight 5,537.0 5,537.0 10:30 11:00 drop. 8/2/2019 8/2/2019 4.00 COMPZ2 WELLPR TRIP P POOH from 5,537' MD to Surface with 5,537.0 0.0 11:00 15:00 4" DP (Racked stands back in derrick). Also laid down Baker Liner running tool. 8/2/2019 8/2/2019 0.50 COMPZ2 WHDBOP MPSP P Pulled wearbushing and set upper lest 0.0 0.0 15:00 15:30 plug. 812/2019 8/2/2019 1.00 COMPZ2 WHDBOP RURD P Rigged up to test BOPs. 0.0 0.0 15:30 16:30 8/2/2019 8/2/2019 6.00 COMPZ2 WHDBOP BOPE P Tested BOPS: All Rams, Annular, and 0.0 0.0 16:30 22:30 valves were tested to Low 250 psi/High 3,500 psi. Tested annular, Rams #1, & #3 with 4" & 4 1/2" test plugs. Tested 4" FOSV and 4" dart valve. All primary and remote BOPE controls, Koomey and Driller's station were tested. The lower kelly IBOP initial lest failed. 8/2/2019 8/3/2019 1.50 COMPZ2 WHDBOP RGRP T Changed out lower IBOP and saver 0.0 0.0 22:30 00:00 1 1 sub on top drive. 8/3/2019 8/3/2019 1.00 COMPZ2 WHDBOP RGRP P Changed out Lower IBOP and saver 0.0 0.0 00:00 01:00 sub. 8/312019 8/312019 0.50 COMPZ2 WHDBOP BOPE P Tested lower IBOP Low 250 psi/ High 0.0 0.0 01:00 01:30 2,500 psi. Passed. 8/3/2019 8/3/2019 1.50 COMPZ2 WHDBOP MPSP P B/D choke manifold, and Choke/Kill 0.0 0.0 01:30 03:00 Lines. Cleaned and cleared rig floor. Pulled test plug and installed 12" x 6 7/8" ID x 10 3/4" OD wear ring. 8/3/2019 8/3/2019 1.25 COMPZ2 FISH BHAH P M/U and scribed Whipstock Retrieval 0.0 0.0 03:00 04:15 1 1 BHA. 8/3/2019 813/2019 1.75 COMPZ2 FISH TRIP P RIH with Whipstock retieval BHA from 0.0 3,011.0 04:15 06:00 161' MD to 3,011' MD w/ 4" DP from derrick. UW = 81 k, and DW = 80k. Shallow tested the MWD at 2,061' MD. 8/3/2019 8/3/2019 6.00 COMPZ2 FISH TRIP P RIH from 3,011' MD to 13,960' MD. w/ 3,011.0 13,960.0 06:00 12:00 4" DP from derrick. UW = 220k, and DW = 120k. Logged R/A tag at 13,885' MD. 8/3/2019 8/3/2019 4.50 COMPZ2 FISH FISH P Washed down from 13,960' MD to 13,960.0 14,082.0 12:00 16:30 14,140' MD at 250 gpm (1,500 psi, 13% FLow, UW = 206k, DW = 120k. As per Baker rep, oriented 135 degrees LOHS, washed whipstock slot X4, Attempted to hoo. Washed slot X5. Oriented 45 degrees ROHS. Eventually hooked whipstock at 14,129' MD. Jarred free with 6 hits. UW= 213k. POOH to 14082' MD. 8/3/2019 8/3/2019 1.50 COMPZ2 FISH CIRC P CBU at 250 gpm (SPP 1,500 psi and 14,082.0 14,082.0 16:30 18:00 13% Flow). Initial loss rate was 100 bbls/hr. Losses gradually reduced when lowering the flow down to 3.8 bpm. Page 54/58 Report Printed: 8/1212019 n . Operations Summary (with Timelog Depths) t CDS-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Stam Time I End Time our (hr) Phase Op Code Activity Cod. Time P -T -X Operation Start Dept (ftKB) End Dept (WS) 8/3/2019 8/3/2019 0.75 COMPZ2 FISH CIRC P Recorded Slow pump rates and 14,082.0 14,082.0 18:00 1845 circulated: #1 Mud Pump 20 spm / 270 psi 30 spm 1450 psi #2 Mud Pump 20 spm / 260 psi 30 spm / 440 psi 8/3/2019 8/3/2019 3.00 COMPZ2 FISH TRIP P POOH from 14,082' MD to 11,815' 14,082.0 11,815.0 18:45 21:45 MD. Monitored hole for swabbing and adjusted pulling speed to obtain proper hole fill, 1,080 - 1,800 fph. PIU = 180k. Monitored well with constant fill on pit #2. 8/3/2019 8/4/2019 2.25 COMPZ2 FISH OWFF P OWFF at 11.815' MD. The well 11,815.0 11,815.0 21:45 00:00 ballooned back a total of 8.7 bbls until static conditions were finally observed: Time (min)/Flow Out (bph): 10/15 20/9.6 30/5.4 40/3.0 50/1.2 60/0.6 7010,23 80/0.05 90/0 120/0 8/4/2019 8/4/2019 6.00 COMPZ2 FISH TRIP P POOH from 11,815' MD to 1,324' MD. 11,815.0 1,324.0 00:00 06:00 Monitored well with constant fill on pit #2. 8/4/2019 8/4/2019 1.00 COMPZ2 FISH TRIP P POOH from 1,324' MD to 255' MD. 1,324.0 255.0 06:00 07:00 Monitored well (10 bph static losses) 8/4/2019 8/4/2019 2.50 COMPZ2 FISH BHAH P PJSM. L/D hook and whipstock 255.0 0.0 07:00 09:30 assembly as per Baker Hughes Rep. 8/4/2019 8/4/2019 1.00 COMPZ2 RPCOMP CLEN P Cleaned and cleared rig floor of all 0.0 0.0 09:30 10:30 non essential tools and equipment, Staged clean out BHA on rig floor. 8/4/2019 8/4/2019 1.50 COMPZ2 RPCOMP SLPC P PJSM. Slipped and cut drill line (17 0.0 0.0 10:30 1200 wraps). Serviced top drive, blocks, draw works, and iron roughneck. 8/4/2019 8/4/2019 1.00 COMPZ2 RPCOMP BHAH P PJSM. P/U clean out BHA as per 0.0 147.0 12:00 13:00 Baker rep to 147'. UW=47k, and DW= 50k. 8/4/2019 8/4/2019 7.00 COMPZ2 RPCOMP TRIP P RIH from 147' MD to 14,130' MD w/ 4" 147.0 14,130.0 13:00 20:00 DP from the derrick. UW = 205k and DW = 120k. Monitored displacement on pit #2. Filled pipe every 20 stands for displacement. 8/4/2019 8/4/2019 1.00 COMPZ2 RPCOMP CIRC P Filled pipe at 5 bpm (785 psi, 8% Flow 14,130.0 14,205.0 20:00 21:00 out, UW= 205k, DW= 120k). Observed pressure increase at 14,205' MD (905 psi), Set down with 5klbs @ 14,225' MD, Page 55158 ReportPrinted: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Time End Time our (hQ PhaseOp Code Aoliviry Cod. Time P-T-X Operation Start Depth (ftKB) End Depth(ftKB) 8/4/2019 8/5/2019 3.00 COMPZ2 RPCOMP CIRC P Pumped 75 bbls Hi Vis Sweep at 210 14,205.0 14,205.0 21:00 00:00 gpm (780 psi, 7% flow out put. Max gas = 219, and total strokes = 7,365. Recorded Slow pump rates and circulated: #1 Mud Pump 20 spm 1260 psi 30 spm 1370 psi #2 Mud Pump 20 spm / 240 psi 30 spm / 370 psi 8/5/2019 8/5/2019 2.75 COMPZ2 RPCOMP OWFF P OWFF. Observed 41.3 bbls flow back 14,205.0 14,205.0 00:00 0245 until static conditions were reached. 8/5/2019 8/5/2019 1.75 COMPZ2 RPCOMP TRIP P POOH from 14,205' MD to 13,529' MD 14,205.0 13,529.0 02:45 0430 on elevators whilst L/D 4" DP to pipe shed. Monitored hole fill on pit #2. P/U = 215k and SO = 90k. 8/5/2019 8/5/2019 0.25 COMPZ2 RPCOMP OWFF P OWFF. Static. 13,529.0 13,529.0 04:30 0445 8/5/2019 8/5/2019 1.25 COMPZ2 RPCOMP TRIP P POOH from 13,529' MD to 13,130' MD 13,529.0 13,130.0 04:45 06:00 on elevators whilst UD 4" DP to pipe shed. Monitored hole fill on pit #2. P/U = 200k and SO = 115k. 8/5/2019 8/5/2019 6.00 COMPZ2 RPCOMP TRIP P POOH from 13,130' MD to 9,849' MD 13,130.0 9,849.0 06:00 12:00 on elevators whilst L/D 4" DP to pipe shed. Monitored hole fill on pit #2. P/U = 132k and SO = 90k. 8/5/2019 8/5/2019 6.00 COMPZ2 RPCOMP TRIP P POOH from 9,849' MD to 7,120' MD 9,849.0 7,120.0 12:00 18:00 on elevators whilst UD 4" DP to pipe shed. Monitored hole fill on pit #2. P/U = 110k and SO = 88k. 8/5/2019 8/6/2019 6.00 COMPZ2 RPCOMP TRIP P POOH from 7,120' MD to 3,380' MD 7,120.0 3,380.0 18:00 00:00 on elevators whilst UD 4" DP to pipe shed. Monitored hole fill on pit #2. P/U =81k and SO=61 k. 8/6/2019 8/6/2019 4.50 COMPZ2 RPCOMP TRIP P POOH from 3,380' MD to O' MD on 3,380.0 0.0 00:00 04:30 elevators whilst UD 4" DP to pipe shed. Monitored hole fill on pit #2. 8/6/2019 8/6/2019 1.50 COMPZ2 RPCOMP BHAH P Changed out BHA while OWFF: 0.0 0.0 04:30 06:00 Cleaned magnets, L/D string mills and jars. M/U bull nose, floats, and magnets. 8/6/2019 8/6/2019 6.00 COMPZ2 RPCOMP TRIP P RIH from surface to 12,896' MD with 0.0 12,896.0 06:00 12:00 4" DP from the derrick. UW = 188k and DW = 108k. Monitored displacement on pit #2. Filled pipe every 20 stands. 8/6/2019 8/6/2019 1.75 COMPZ2 RPCOMP CIRC P Displaced well to 10.2 ppg Corrosion 12,896.0 12,896.0 12:00 1345 Inhibited Brine. Rotated and reciprocated pipe from 12,857' MD to 12,952' MD. 253 gpm, Observed the following parameters: ICP = 720 psi, FCP = 710 psi, F/O = 9%, UW = 188k, DW = 108k, RTW = 139k, TO = 10k, Total strokes = 6,354, Max gas = 635, and Losses = 96 bbls. 8/6/2019 8/6/2019 2.00 COMPZ2 RPCOMP OWFF P OWFF Observed 34 bbls flow back 12,896.0 12,896.0 13:45 15:45 until static conditions were reached in 90 minutes. Page 56/58 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) + CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log Start Time End Time Our (hr) Phase Op Cotle Activity Cotle Time P-T-X Operation Start Depth (ftKa) End Depth mK5) 8/6/2019 8/6/2019 2.25 COMPZ2 RPCOMP TRIP P POOH from 12,896' MD to 12,022' MD 12,896.0 12,022.0 15:45 1800 on elevators whilst UD 4" DP to pipe shed. UW = 150k and DW = 111 k. Pumped 20 bbls dry job at 12,477' MD. 8/6/2019 8/7/2019 6.00 COMPZ2 RPCOMP TRIP P POOH from 12,022' MD to 8,149' MD 12,022.0 8,149.0 18:00 0000 on elevators whilst L/D 4" DP to pipe shed. UW = 105k and DW = 85k. Monitored well w/ constant hole fill via pit #2. 8/7/2019 8/7/2019 6.00 COMPZ2 RPCOMP TRIP P POOH from 8,149' MD to 4,067' MD 8,149.0 4,067.0 00:00 06:00 on elevators whilst L/D 4" DP to pipe shed. UW = 89k and DW = 86k. Monitored well w/ constant hole fill via pit #2. 8/7/2019 8/7/2019 4.00 COMPZ2 RPCOMP TRIP P POOH from 4,067' MD to surface on 4,067.0 0.0 06:00 10:00 elevators whilst L/D 4" DP to pipe shed. Monitored well w/ constant hole f II via pit #2. 8/7/2019 8/7/2019 0.75 COMP22 RPCOMP BHAH P UD BHA: magnet, pups, Floats, and 0.0 0.0 10:00 10:45 bull nose. 8/7/2019 8/7/2019 0.50 COMPZ2 RPCOMP WWWH P Pulled wear ring in preparation to 0.0 0.0 10:45 11:15 wash wellhead and BOPS. 8/7/2019 8/7/2019 0.75 COMPZ2 RPCOMP WWWH P Made stack washer, washed wellhead, 0.0 0.0 11:15 1200 and BOP stack. 415 gpm, 20, rpm. UD stack washer and last two joints of DR 8/7/2019 8/7/2019 1.50 COMPZ2 RPCOMP RURD P Rigged up to run 4 1/2" Upper 0.0 0.0 12:00 1330 Completions. 8/7/2019 8/7/2019 4.50 COMPZ2 RPCOMP RCST P RIH from surface to 1,280' MD w/ 4 0.0 1,280.0 13:30 1800 1/2" 12.6 ppf L-80 H563 as per planned upper completions detail. UW= 54k, and DW=59k. Tested I-Wire after termination to 5,000 psi for 5 minutes (Witnessed). 8/7/2019 8/8/2019 6.00 COMPZ2 RPCOMP RCST P RIH from 1,280' MD to 6,289' MD w/4 1,280.1) 6,289.0 18:00 00:00 1/2" 12.6 ppf L-80 H563 as per planned upper completions detail. UW= 79k, and DW=81k. Tested I-Wire every 10-15 joints. 8/8/2019 8/8/2019 6.00 COMPZ2 RPCOMP RCST P RIH from 6,289' MD to 11,839' MD w/ 6,289.0 11,839.0 00:00 0600 4 1/2" 12.6 ppf L-80 H563 as per planned upper completions detail. UW= 129k, and DW = 102k. Tested I- Wire every 10-15 joints. 8/8/2019 8/8/2019 4.00 COMPZ2 RPCOMP RCST P RIH from 11,839' MD to top of No Go 11,839.0 14,186.0 06:00 1000 at top of liner at 14,228' MD w/ 4 1/2" 12.6 ppf L-80 H563 as per planned upper completions detail. UW= 162k, and DW = 102k. Tested I-Wire every 10-15 joints. UD 3 joints to 14,148'. P/U 37.95' space outjoint. RIH to -1 14,186' MD. 8/8/2019 8/8/2019 50 COMPZ2 RPCOMP RCST P As per FMC rep, M/U hanger and 14,186.0 14,186.0 10:00 11:30 Landing joint. Terminated I-Wire on hanger and tested to 5,000 psi for 5 minutes. (Witnessed). 8/8/2019 8/8/2019 0.50 COMPZ2 RPCOMP RCST P per FMC rep, landed hanger, and 14,186.0 14,217.0 11:30 12:00 ran in lock down screws. WLEG @ JAs 14,216.63' MD. In hole 341 full clamps, 7 half clamps. Page 57/58 Report Printed: 8/12/2019 Operations Summary (with Timelog Depths) CD5-98 Rig: DOYON 25 Job: DRILLING ORIGINAL Time Log $tartTime End Time our (m) Phase Op Code Activity Code Time P -T -X Operation Start Depth (ftKB) End Depth(ftKB) 8/8/2019 8/8/2019 3.50 COMPZ2 RPCOMP PRTS P R/U to test tubing and annulus. Tested 14,217.0 14,217.0 12:00 1530 tubing to 4,200 psi. Pressure dropped at 4 minutes into the test by 100 psi in 3 minutes. Began losing pressure faster, Bled off pressure. Consulted with engineer. Halliburton packer was set at 2,400 psi. and 2,600 psi. Tested IA to 1,500 psi for 30 minutes (Charted). 8/8/2019 8/8/2019 0.50 COMPZ2 RPCOMP CIRC P Sheared SOV at 2,200 psi. Pumped 8 14,217.0 14,217.0 15:30 16:00 bbls @ 1.5 bpm and 360 psi to ensure full shear. R/D pumping equipment on landing joint. OWFF for 10 minutes. (Static). 8/8/2019 8/8/2019 1.00 COMPZ2 WHDBOP PRTS P Pulled landing joint. Set HP type H 14,217.0 14,217.0 16:00 17:00 BPV as per FMC. Instaled landing joint. Tested BPV in direction of flow. to 2,200 psi for 10 minutes (Charted). Pumped 1 SPM to maintain test pressure. OWFF for 30 minutes (Static). L/D landing joint. 8/8/2019 8/8/2019 3.50 COMPZ2 WHDBOP NUND P N/D BOPs. UD trip nipple, removed 14,217.0 14,217.0 17:00 20:30 Joes box, kill lines, choke lines, rack back BOP stack, N/D 14.5' riser, 3' spool, and 11" x 13 5/8" DSA, 8/8/2019 8/9/2019 3.50 COMPZ2 WHDBOP NUND P As per FMC and SLB repsm 14,217.0 14,217.0 20:30 0000 terminated I -Wire. N/U adapter and frac tree. 8/9/2019 8/9/2019 3.00 COMPZ2 WHDBOP NUND P M/U Flange and frac tree as per FMC 14,217.0 14,217.0 00:00 0300 rep. 8/9/2019 8/9/2019 1.00 COMPZ2 WHDBOP PRTS P Tested adapter flange to 5,000 psi 14,217.0 14,217.0 03:00 0400 (Witnessed) 8/9/2019 8/9/2019 1.00 COMPZ2 WHDBOP PRTS P Filled Frac tree with diesel. Tested 14,217.0 14,217.0 04:00 05:00 Frac tree to 250 psi/10,000 psi for 10 minutes each. 8/9/2019 8/9/2019 1.00 COMPZ2 WHDBOP PRTS P Pulled test dart and HP BPV. Rigged 14,217.0 14,217.0 05:00 06:00 up in preparation to pump freeze protect. Pressure tested manifold and hardlines to 2,500 psi. 8/9/2019 8/9/2019 2.00 COMPZ2 WHDBOP FRZP P Pumped 86 bbls of diesel freeze 14,217.0 14,217.0 06:00 0800 protect from the ball mill into the IA and lined up U -tubed to balance at 2,000' TVD. Installed H BPV SIMOPS: Lowered cattle chute, disconnected pits and pump interconnects, and prepped to scope down derrick. 8/9/2019 8/9/2019 4.00 DEMOB MOVE DMOB P Scoped derrick down, secured top 14,217.0 14,217.0 08:00 1200 drive, energy track, bails, roof caps on tuggers, and cleaned pits. 8/9/2019 8/9/2019 2.00 DEMOB MOVE OMOB P Raised C -Section and Pin.Opened 14,217.0 14,217.0 12:00 14:00 doors on rig floor and extended mast cylinders. Continue remove fluids from pits and ball mill. 8/9/2019 8/9/2019 2.00 DEMOB MOVE DMOB P Held a safety stand up. Skidded rig 14,217.0 14,217.0 14:00 16:00 floor, and derrick. Ball mill emptied of fluids. Released from well CD5-98 on 08/09/2019 at 16:00 hrs. Page 58/58 Report Printed: 8/12/2019 NADConversion Western North Slope CD5 Alpine West Pad CDS-98L1 F6- 27 AJuiSP 4 ConocoPhillips Definitive Survey Report 14 August, 2019 Final Definitive Survey Verified and Signed -off All targets and/or well position objectives have been achieved. ❑ Yes ❑ No I have checked to the best of my ability that the following data is correct: E) Surface Coordinates O Declination 8 Convergence 2 GRS Survey Corrections stephen.fell@c ❑ Survey Tool Codes ontractor.cono a SLB De cophillips.com Client Representative: MatthewSmith.' Date: ConocoPhillips ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project: Western North Slope TVD Reference: CD5-98 Actual @ 73.45usft (D25) Site: COS Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) Well: CD5-98 North Reference: True Wellbore: CD5-981_1 Survey Calculation Method: Minimum Curvature Design: CD5-98L7 Database: EDT 14 Alaska Production Project Western North Slope, North Slope Alaska, United States Map System: US State Plane 1927 (Exact solution) System Datum: Mean Sea Level Geo Datum: NAD 1927 (NADCON CONUS) Using Well Reference Point Map Zone: Alaska Zone 04 Using geodetic scale factor yWY CD5-98 ACTUAL Tie On Depth: Well Position +N/S 0.00 usft Northing: +El -W 0.00 usft Easting: Position Uncertainty 0.00 usft Wellhead Elevation: 1,426.06 CDS98 Srvy 2- SLB _MWD+GMAG(CD MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Mult4Sbuion Correcl6/7/2019 8:27:0, Wellbore CD5.98L1 Magnetics Model Name Sample Date BGGM2018 6/15/2019 Design CD5-98L1 Audit Notes: Version: 1.0 Vertical Section: 5,965,926.49 usft Latitude: 349,577.80 usft Longitude: 0.00 usft Ground Level: 70° 18'50.480 N 151°13'6.948W 33.90 usft Declination Dip Angle Field Strength (9 0 Inn 16.09 Phase: ACTUAL Tie On Depth: Depth From (TVD) +N/S +EI -W (usft) lush) (usft) 39.55 0.00 0.00 80.73 14,075.51 Direction C) 176.10 57,376 Survey Program Data From To (usft) (usft) Survey (Wellbore) Tool Name Description Survey Date 124.86 705.01 CD5-98 Srvy 1 - SLB_GWD70 (CD5-98) GYD-GC-SS Gyrodata gyro single shots 6/7/2019 8:24:0 802.88 1,426.06 CDS98 Srvy 2- SLB _MWD+GMAG(CD MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Mult4Sbuion Correcl6/7/2019 8:27:0, 1,484.04 1,745.70 CDS98 Srvy 3- SLB_GWD70 (CDS-98) GYD-GC-SS Gyrodata gyro single shots 6/8/2019 8:24:0, 1,802.20 2,214.38 CDS-98 Srvy 4-SLB_MWD+GMAG(CD MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Multi -Station Coned6/7/2019 8:27:01 2,305.63 2,305.63 CD5-98 Srvy 5- SUB _MWD_INC-Filler(C MWD-INC_ONLY(INC>10°)MWD-INC_ONLY_FILLER(INC>10`) 6/11/2019 802:1 2,399.18 14,075.51 CD5-98 Srvy 6-SLBMWD+GMAG(CD MWD+IFR2+SAG+MS OWSG MWD +IFR2+ Sag +Multi -Station Correct6/12/20198:06:1 14,120.00 14,344.65 CD5-981.7 Srvy 1-SLB_MWD-INC only MWD -INC ONLY (INC>l0°) MWD -INC_ ONLY FILLER ( INC>10°) 7/22/2019 9:41: 14,439.17 14,534.05 C135-9811 Srvy 2- SLB _MWD+GMAG(C MWD+IFR2+SAG+MS OWSG MWD + IFR2 + Sag + Mufti -Station Correcl7/22/201912:55 14,629.21 14,629.21 CDS98L1 Srvy 3-SLB_MWD-INC-ONLY MWD-INC_ONLY(INC>10°)MWD-INC_ONLY FILLER(INC>10°) 7/22/2019 12:55 14,724.28 18,523.06 C135-981.1 Srvy 4-SLB_MWD+GMAG(C MWD+IFR2+SAG+MS OWSG MWD+IFR2+ Sag +Multi -Station Coned7/22/20191255 18,617.37 18,617.37 CD5-981_1 Srvy 5- SLB _MWD -INC -ONLY MWD -INC _ ONLY (INC>10°)MWD-INC _ ONLY FILLER(INC>10°) 7/24/201912:55 18,713.94 29,420.46 CD5-98L1 Srvy 6-SLB_MWD+GMAG(C MWD+IFR2+SAG+MS OWSG MWD+IFR2+ Sag +Multi -Station Coned7/24/201912:55 Survey Map Map Vertical MD Inc Azl TVD TVDSS +WS +E/ -W Northing Easting OLS Section (usft) (1) P) (usft) (usft) (usft) (usft) (ft) (ft) (-/100') (ft) Survey Tool Name 39.55 0.00 0.00 39.55 53.90 am 0.00 5,965,92649 349,577.80 000 0.00 UNDEFINED 124.66 0.42 205.38 124.66 51.21 -0.28 -0.13 5,965,926.21 349,577.66 0.49 0.27 GYD-GC-SS (1) 139.82 0.62 174.75 139.82 66.37 -0.41 -0.15 5,965,926.08 349,577.64 2.21 0.40 GYD-GCSS(1) 237.65 0.78 206.68 237.64 164.19 -1.54 440 5,965,924.96 349,577.37 0.42 1.50 GYD-GCSS(1) 8/14!1019 12:48:20PM Page 2 COMPASS 5000. 14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project: Westem North Slope TVD Reference: CD5-98 Actual Q 73.45usft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) Well: CDS-98 North Reference: True Wellbore: CD5.9811 Survey Calculation Method: Minimum Curvature Design: CD5-9811 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Aid TVD TVDSS +W -S +E/ -W Northing Easting DLS Section (11x11) (1) (°) Nam (11sft) (usf) (11611) (ft) Ift) (°11001 (ft) Survey Tool Nam 325.13 0.77 196.48 325.11 251.66 -2.63 -6.83 5,965,923.87 349,576.91 0.16 2.57 GYD-GCSS(1) 422.09 0.22 319.42 422.07 348.62 -3.11 -1.14 5,965,923.40 349,576.60 0.94 3.03 GYD-GC-SS(1) 516.11 0.42 20.89 516.09 442.64 -2.66 -1.14 5,965,923.86 349,576.61 0.39 2.57 GYD-GC-SS(1) 614.06 0.66 344.04 614.04 640.59 -1.78 -1.16 5,965,924.73 349,576.60 0.42 1.69 GYD-GC-SS(1) 705.01 1.26 330.68 704.97 631.52 4).40 -1.80 5,965,926.12 349,576.00 0.70 0.28 GYD-GCSS(1) 802.88 3.78 319.35 802.74 729.29 2.98 4.42 5,965,929.56 349,573.44 2.61 3.28 MWD+IFR2+SAG+MS(2) 859.17 5.10 314.36 858.86 785.41 6.14 -7.42 5,965,932.78 349,570.50 2.44 5.63 MWD+IFR2+SAG+MS(2) 953.51 6.89 314.14 952.68 879.23 13.01 -14.48 5,965,939.79 349,563.58 1.90 -13.97 MIND+IFR2+SAG+MS (2) 1,047.90 8.73 315.35 1,046.19 972.74 22.05 -23.58 5,965,949.01 349,554.67 1.96 -23.61 MWD+IFR2+SAG+MS (2) 1,142.36 10.10 316.15 1,139.38 1,065.93 33.13 34.36 5,965,960.30 349,544.12 1.46 -35.39 MWD+IFR2+SAG+MS(2) 1,188.38 10.75 319.46 1,184.64 1,111.19 39.30 39.94 5,965,966.58 349,538.65 1.92 41.93 MWD+IFR2+SAG+MS(2) 1,236.25 12.06 321.20 1,231.56 1,158.11 46.59 45.98 5,965,973.99 349,532.77 2.83 -49.61 MWD+IFR2+SAG+MS(2) 1,332.06 13.28 320.74 1,325.04 1,251.59 62.91 59.21 5,966,990.57 349,519.86 1.28 -66.79 MWD+IFR2+SAG+MS(2) 1,426.06 14.41 320.81 1,416.30 1,342.85 80.34 -73.4 5,966,008.27 349,505.99 1.20 -85.15 MWD+IFR2+SAG+MS(2) 1,484.04 15.71 321.60 1,472.29 1,398.84 92.08 -82.87 5,965,020.20 349,4%.80 2.27 -97.51 GYD-GCSS(3) 1,555.92 17.21 320.91 1,541.22 1,46].77 107.96 -95.62 5,966,036.34 349,484.37 2.10 -114.22 GYD-GCSS (3) 1,651.07 19.56 319.98 1,631.51 1,558.06 131.09 -114.74 5,966,059.84 349,465.71 2.49 -138.59 GYD-GC-SS (3) 1,745.70 23.02 317.25 1,719.67 1,646.22 156.81 -137.50 5,966,086.01 349,443.48 3.80 -165.81 GYD-GC-SS(3) 1,802.20 24.66 318.74 1,771.35 1,697.90 173.79 -152.77 5,965,103.29 349,428.55 3.09 -183.78 MWD+IFR2+SAG+MS(4) 1,895.00 28.24 320.39 1,854.42 1780.97 205.27 -179.54 5,966,135.29 349,402.42 3.94 -217.01 MWD+IFR2+SAG+MS(4) 1,989.35 31.20 319.91 1,936.35 1,862.90 241.17 -209.52 5,966,171.79 349,373.17 3.15 -254.87 MWD+IFR2+SAG+MS(4) 2,083.43 34.M1 318.87 2,015.42 1,941.97 279.84 -242.70 5,966,211.11 349,340.77 3.45 -295.70 MWD+IFR2+SAG+MS (4) 2,178.35 37.00 318.83 2,092.50 2,019.05 321.54 -279.15 5,966,253.53 349,305.17 2.74 339.79 MWD+IFR2+SAG+MS(4) 2,214.38 38.02 319.41 2,121.08 2,047.63 338.13 -293.50 5,966,270.40 349,291.15 3.00 557.32 MWD+IFR2+SAG+MS(4) 2,286.00 39.28 319.68 2,177.01 2,103.56 372.16 -322.53 5,966,305.01 349,262.82 1.77 393.25 Interpolated Station 10 314" 2,305.63 39.62 319.75 2,192.17 2,118.72 381.68 330.59 5,966,314.68 349,254.95 1.77 403.29 MM -INC _ONLY (INC>10°)(5) 2,399.18 41.81 320.07 2,263.08 2,189.63 428.36 569.88 5,966,352.14 349,216.60 2.35 452.54 MWD+IFR2+SAG+MS(6) 2,493.82 44.39 319.65 2,332.17 2,258.72 477.79 411.57 5,966,412.39 349,175.91 2.74 506.69 MWD+IFR2+SAG+MS(6) 2,587.97 45.68 319.96 2,398.71 2,325.26 528.67 454.56 5,966,464.12 349,133.96 1.39 558.38 MWD+IFR2+SAG+MS(6) 2,681.83 46.92 320.64 2,463.55 2,390.10 580.88 497.90 5,966,517.19 349,091.67 1.42 {13.42 MWD+IFR2+SAG+MS (6) 2,776.94 48.11 320.40 2,527.79 2,454.34 635.02 542.50 5,966,572.20 349,048.17 1.26 -670.46 MWD+IFR2+SAG+MS(6) 2,870.86 50.10 320.41 2,589.27 2,515.82 689.72 587.74 5,966,627.79 349,004.04 2.12 -728.12 MWD+IFR2+SAG+MS(6) 2,964.88 53.01 321.34 2,647.72 2,574.27 746.85 534.19 5,966,685.83 348,958.74 3.19 -788.27 MWD+IFR2+SAG+MS (6) 3,068.09 54.31 321.59 2,702.96 2,629.51 805.58 -680.97 5,965,745.49 348,913.16 1.41 350.05 MWD+IFR2+SAG+MS (6) 3,152.29 55.88 320.68 2,756.86 2,683.41 865.72 -729.45 5,966,806.59 348,865.90 1.85 -913.36 MWD+IFR2+SAG+MS(6) 3,246.12 57.83 320.06 2,808.16 2,734.71 926.22 -779.56 5,966,868.07 348,817.01 2.15 -977.13 MWD+IFR2+SAG+MS(6) 3,340.41 59.70 318.98 2,857.05 2,783.60 987.54 531.90 5,966,930.42 348,765.92 2.21 -1,041.86 MWD+IFR2+SAG+MS(6) 3,435.03 61.65 318.78 2,903.39 2,829.94 1,049.68 -886.15 5,966,993.63 348,712.92 2.07 -1,107.55 MWD+IFR2+SAG+MS(6) 3,529.33 63.94 318.83 2,946.50 2,873.05 1,112.79 541.38 5,967,057.83 348,658.97 2.43 -1,174.27 MWD+IFR2+SAG+MS(6) 81142019 12:48:20PM Page 3 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project Western North Slope TVD Reference: CDS-98 Actual @ 73.45usft (D25) Site: CDS Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) Wen: CD5-98 North Reference: True Wellbore: CD5-98L1 Survey Calculation Method: Minimum Cun2ture Design: CD5-981-1 Database: EDT 14 Alaska Production Survey 8/1412019 12:48:20PM Page 4 COMPASS 5000.14 Build 85H Map Map vertical MD Inc AN TVD TVDS$ +N/-3 +E/ -W Northing Easgng DIS Section (usft) 0 (•) (usft) (usft) (unit) (waft) (ft) pct (°11001 (ft) Survey Tool Name 3,622.86 65.98 318.12 2,986.08 2,912.63 1,176.22 -997.56 5,967,122.37 348,604.08 2.29 -1,241.38 MWD+1FR2+SAG+MS(6) 3,717.05 68.56 317.84 3,022.48 2,949.03 1,240.75 -1,0M.71 5,967,188.05 348,547.24 2.75 -1,309.72 MWD+IFR2+SAG+MS(5) 3,811.58 69.54 316.87 3,056.28 2,982.83 1,305.69 -1,115.51 5,967,254.16 348,488.75 1.41 -1,378.57 MWD+IFR2+SAG+MS(6) 3,905.49 70.8 316.06 3,088.38 3,014.93 1,369.66 -1,176.30 5,967,319.34 348,429.26 1.29 -1,496.54 MWD+IFR2+SAG+MS(6) 3,999.76 72.95 316.82 3,117.95 3,044.50 1,434.52 -1,237.98 5,967,385.42 348,368.90 2.73 -1,515.44 MWD+IFR2+SAG+MS(6) 4,095.47 75.23 317.23 3,194.19 3,070.74 1,501.86 -1,300.71 5,967,454.00 348,307.53 2.42 -1,586.90 MWD+IFR2+SAG+MS(6) 4,189.18 76.17 317.47 3,167.33 3,093.88 1,568.65 -1,362.24 5,967,522.00 348,247.36 1.03 -1,657.72 MWD+IFR2+SAG+MS (6) 4,283.03 76.23 317.83 3,189.72 3,116.27 1,636.01 -1,423.63 5,967,590.57 348187.33 0.38 -1,729.10 MWD+IFR2+SAG+MS(6) 4,377.04 76.67 317.75 3,211.75 3,138.30 1,703.70 -1,485.04 5,967,659.47 348,127.30 0.48 -1,800.81 MWD+IFR2+SAG+MS(6) 4,470.39 76.51 317.59 3,233.40 3,159.95 1,770.83 -1,546.18 5,967,727.81 348,067.51 0.24 -1,871.95 MWD+IFR2+SAG+MS(6) 4,563.75 77.01 317.16 3,254.78 3,181.33 1,837.70 -1,607.73 5,967,795.89 348,007.33 0.70 -1,942.85 MWD+IFR2+SAG+MS(6) 4,657.68 77.11 317.23 3,275.79 3,202.34 1,904.79 -0,669.87 5,967,864.21 347,946.55 0.13 -2,014.01 MWD+IFR2+SAG+MS(6) 4,751.62 77.56 317.46 3,296.41 3,222.96 1,972.27 -1,732.04 5,967,932.92 347,885.75 0.53 -2,085.57 MWD+IFR2+SAG+MS(6) 4,846.27 77.53 316.61 3,316.82 3,243.37 2,039.90 -1,795.03 5,968,001.79 347,824.13 0.88 -2,157.33 MWD+IFR2+SAG+MS(6) 4,940.94 77.22 316.07 3,337.51 3,264.06 2,106.74 -1,858.80 5,968,069.88 397761.71 0.65 -2,228.35 MWD+IFR2+SAG+MS(6) 5,036.48 77.28 315.81 3,358.60 3,285.15 2,173.70 -1,923.60 5,968,138.12 347,698.27 0.27 -2,299.56 MWD+IFR2+SAG+MS(6) 5,130.57 77.89 314.40 3,378.83 3,305.38 2,238.79 -1,988.46 5,968,204.50 347,634.74 1.60 -2,368.92 MWD+IFR2+SAG+MS (6) 5,224.19 77.85 313.70 3,398.50 3,325.05 2,302.43 -2,054.24 5,968,269.4 347,570.24 0.73 -2,436.89 MWD+IFR2+SAG+MS(6) 5,318.00 77.61 313.53 3,418.4 3,394.99 2,365.66 -2,120.61 5,968,333.98 347,505.16 0.31 -2,504.49 MWD+IFR2+SAG+MS(6) 5,412.44 77.70 313.40 3,438.63 3,365.18 2,429.13 -2,187.57 5,968,398.77 347,439.49 0.16 -2,572.36 MWD+IFR2+SAG+MS(6) 5,505.87 77.70 313.04 3,458.53 3,385.08 2,491.64 -2,254.09 5,968,462.60 347,374.24 0.38 -2,639.26 MWD+IFR2+SAG+MS(6) 5.601.16 77.78 312.81 3,478.77 3,405.32 2,555.06 -2,322.28 5,968,527.36 347,307.35 0.25 -2,707.17 MWD+IFR2+SAG+MS(6) 5,695.29 77.30 312.68 3,499.08 3,425.63 2,617.44 -2,389.78 5,968,591.08 347,241.12 0.53 -2,774.00 MWD+IFR2+SAG+MS (6) 5,788.73 77.73 313.14 3,519.28 3,445.83 2,679.55 -2,456.59 5,968,654.52 347,175.56 0.67 -2,840.52 MWD+IFR2+SAG+MS(6) 5,882.96 78.0 314.58 3,539.09 3,465.64 2,743.39 -2,523.02 5,968,719.66 347,110.43 1.52 -2,908.72 MWD+IFR2+SAG+MS(6) 5,976.76 77.85 315.96 3,55B.71 3,485.26 2,808.55 -2,587.57 5,968788.10 347,047.21 1.45 -2,978.13 MWD+IFR2+SAG+MS(6) 6,071.62 77.56 318.11 3,578.91 3,505.46 2,876.37 -2,650.73 5,968,855.16 346,985.42 2.24 -3,050.08 MWD+IFR2+SAG+MS (6) 6,164.91 78.13 318.41 3,598.55 3,525.10 2,944.42 -2,711.45 5,968,924.41 346,926.08 0.69 3,122.11 MM+IFR2+SAG+MS(6) 6,257.72 77.75 318.75 3,617.95 3,544.50 3,012.48 -2,771.49 5,968,993.66 346,867.42 0.54 3,194.10 MWD+IFR2+SAG+MS(6) 6,352.23 77.88 320.00 3,637.90 3,564.45 3,082.59 -2,831.64 5,969,064.96 346,808.69 1.30 3,268.14 MWD+IFR2+SAG+MS (6) 6,446.66 77.64 321.39 3,657.92 3,584.47 3,154.00 -2,890.10 5,959,137.51 346,751.68 1.6 3,343.36 MWD+IFR2+SAG+MS(6) 6,540.88 77.62 321.02 3,678.18 3,604.73 3,225.71 -2,947.75 5.969.210.36 346,695.4B 0.40 -3,418.83 MWD+IFR2+SAG+MS(6) 6,635.25 77.53 319.87 3,698.57 3,625.12 3,296.75 -3,006.42 5,969,282.56 346,638.24 1.19 -3,493.70 MWD+IFR2+SAG+MS(6) 6,729.37 77.40 319.16 3,718.99 3,645.54 3,366.63 3,066.07 5,969,353.62 346,580.01 0.75 3,567.48 MWD+IFR2+SAG+MS(6) 6,824.50 78.04 319.21 3,739.23 3,665.78 3,436.98 -3,126.83 5,969,425.16 346,520.68 0.67 -3,641.80 MWD+IFR2+SAG+MS (6) 6,917.66 77.69 319.64 3,758.81 3,685.36 3.506.16 3,186.07 5,969,495.51 346,462.84 0.59 -3,714.85 MWD+IFR2+SAG+MS(6) 7,012.95 77.94 320.06 3,778.92 3,705.47 3,577.35 -3,246.13 5,969,567.89 346,404.23 0.50 -3,789.97 MWD+IFR2+SAG+MS(6) 7,107.18 77.88 320.27 3,798.66 3,725.21 3,648.11 3,305.15 5,969,639.80 346,346.64 0.23 3,864.57 MWD+IFR2+SAG+MS (6) 7,201.50 7T97 319.34 3,818.45 3,745.00 3,718.78 3,364.87 5,969,711.66 346,288.35 0.97 -3,939.15 MWD+IFR2+SAG+MS(6) 7,296.23 78.09 319.04 3,838.04 3,764.59 3,788.70 -3,425.24 5,969,782.76 348229.40 0.34 4,013.01 MWD+IFR2+SAG+MS(6) 8/1412019 12:48:20PM Page 4 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project Western North Slope TVD Reference: CD5-98 Actual @ 73.45usg (D25) Site: CD5 Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usR (D25) Well: CD5-98 North Reference: True Wellbore: CD5-981-1 Survey Calculation Method: Minimum Curvature Design: C05-981.1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Asl TVD TVDSS +NIS +FJ -W Northing Easting DLS Section (Daft) (*) (1) (usft) (us(t( (weft) ("M (ti (ft) r/1007 (ft) Survey Tool Name 7,389.54 78.05 318.72 3,857.33 3,783.88 3,857.48 3,485.28 5,969,852.72 346,170.75 0.34 4,085.71 1AWD+IFR2+SAG+MS(6) 7,482.56 77.99 318.02 3,876.64 3,803.19 3,925.49 3,545.73 5,969,921.93 346,111.68 0.74 -0,157.68 MWD+IFR2+SAG+MS(6) 7,576.69 78.00 317.46 3,896.21 3,822.76 3,993.63 3,607.65 5,969,991.29 346,051.15 0.58 4,229.88 MWD+IFR2+SAG+MS(6) 7,670.93 77.99 317.58 3,915.82 3,842.37 4,061.61 3,669.90 5,970,060.50 345,990.28 0.13 4,301.94 MWD+IFR2+SAG+MS(6) 7,765.87 77.96 317.96 3,935.60 3,862.15 4,130.37 3,732.31 5,970,130.49 345,929.26 0.39 4,374.78 MWD+IFR2+SAG+MS(6) 7,858.07 77.90 317.95 3,954.88 3,881.43 4,197.33 3,792.69 5,970,198.64 345,870.24 0.07 4,445.69 MWD+IFR2+SAG+MS(6) 7,952.49 77.87 318.24 3,974.69 3,901.24 4,266.03 3,854.35 5,970,268.56 345,809.97 0.30 4,518.44 MWD+IFR2+SAG+MS(6) 8,046.64 78.15 318.77 3,994.25 3,920.80 4,335.01 3,915.37 5,970,338.75 345,750.35 0.63 4,591.41 MWD+IFR2+SAG+MS(6) 8,140.93 77.93 319.07 4,01379 3,940.34 4,404.55 3,975.98 5,970,409.47 345,691.15 0.39 4,664.91 MWD+IFR2+SAG+MS(6) 8,235.96 78.02 318.48 4,033.59 3,960.14 4,474.45 4,037.23 5,970,480.59 345,631.31 0.61 4,738.82 MWD+IFR2+SAG+MS(6) 8,330.25 77.93 317.54 4,053.23 3,979.78 4,543.D0 4,098.93 5,970,550.35 345,571.01 0.98 4,811.40 MMD+IFR2+SAG+MS (6) 8,425.30 77.93 317.08 4,073.11 3,999.66 4,611.32 4,161.95 5,970,619.91 345,509.37 0.47 4,883.85 MWD+IFR2+SAG+MS(6) 8,519.32 78.08 316.21 4,092.65 4,019.20 4,678.19 4,225.08 5,970,688.03 345,447.59 0.92 4,954.86 MWD+IFR2+SAG+MS(6) 8,613.45 78.15 317.04 4,112.04 4,038.59 4,745.14 4,288.34 5,970,756.23 345,385.69 0.87 5,025.97 MWD+IFR2+SAG+MS(6) 8,706.45 78.05 317.38 4,131.21 4,057.76 4,811.92 4,350.16 5,970,824.23 345,325.23 0.37 5,096.80 MWD+IFR2+SAG+MS(6) 8,803.10 77.99 317.50 4,151.27 4,077.82 4,881-56 4.414.11 5,970,895.13 345,262.69 0.14 5,170.63 MWD+IFR2+SAG+MS(6) 8,897.78 78.09 317.82 4,170.90 4,037.45 4,950.02 4,476.49 5,970,964.83 345201.70 0.35 5,243.18 MW0+1FR2+SAG+MS(6) 6,991.99 77.81 317.94 4,190.56 4,117.11 5,018.36 4,538.29 5,971,034.38 345,141.29 0.32 5,315.57 MWD+IFR2+SAG+MS (6) 9,083.23 77.91 316.94 4,209.75 4,136.30 5,084.06 4,598.62 5,971,101.28 345,082.29 1.08 5,385.22 MWD+IFR2+SAG+MS(6) 9,176.80 77.93 315.83 4,229.33 4,155.88 5,150.31 4.661.73 5,971,168.76 345,020.52 1.16 5,455.61 MWD+IFR2+SAG+MS(6) 9,271.97 77.97 314.44 4,249.20 4,175.75 5,216.27 4,727.39 5,971,236.03 344,956.21 1.43 5,525.89 MND+IFR2+SAG+MS(6) 9,365.83 78.00 314.4 4,268.74 4,195.29 5,280.78 4792.71 5,971,301.2 344,892.20 0.42 5,594.69 MWD+1FR2+SAG+MS(6) 9,460.00 78.05 315.85 4,288.28 4,214.83 5,346.31 4,857.45 5,971,368.63 344,828.78 1.05 5,664.47 MWD+IFR2+SAG+MS(6) 9,554.99 78.00 317.25 4,307.99 4,234.54 5,413.76 4,921.36 5,971,437.35 344,766.25 1.44 -5,736.12 MND+IFR2+SAG+MS (6) 9,648.83 77.72 318.47 4,327.73 4,254.28 5,481.79 4,982.91 5,971,506.59 344,708.07 1.31 5,808.18 MWD+IFR2+SAG+MS (6) 9,742.94 77.84 318.46 4,347.65 4,274.20 5,550.64 5,043.90 5,971,576.64 344,646.48 0.13 -5,881.02 MND+IFR2+SAG+MS(6) 9,835.4 78.00 318.37 4,%7.00 4,293.55 5,618.30 5,103.93 5,971,645.48 344587.82 0.20 5.952.60 MWD+IFR2+SAG+MS(6) 9,929.46 75.50 317.61 4,388.55 4,315.10 5,686.29 5,165.18 5,971,714.69 344,527.96 2.77 5,024.61 MND+IFR2+SAG+MS (6) 10,023.45 71.54 316.00 4,415.21 4,341.76 5,751.99 5,226.84 5,971,781.60 344,467.62 4.52 5,094.35 MN4D+IFR2+SAG+MS(6) 10,118.37 68.86 315.29 4,447.36 4,373.91 5,815.85 5,289.27 5,971,846.69 344406.49 2.91 5,162.31 MWD+IFR2+SAG+MS(6) 10,213.23 65.40 313.80 4,484.23 4,410.78 5,877.15 5,351.54 5,971,909.23 344,345.47 3.92 5,227.71 MND+IFR2+SAG+MS (6) 10,306.42 61.99 312.87 4,525.52 4,452.07 5,934.48 5,412.29 5,971,967.76 344285.88 3.77 5,289.04 MWD+IFR2+SAG+MS(6) 10,401.52 58.30 311.52 4,572.85 4,499.40 5,989.88 5,473.37 5,972,024.37 344,225.93 4.07 5,348.47 MND+IFR2+SAG+MS (6) 10,495.63 54.63 310.30 4,624.83 4,551.38 6,041.26 5,532.63 5,972,076.92 344,167.72 4.05 5,403.76 MN4D+IFR2+SAG+MS (6) 10,589.85 49.28 308.55 4,682.88 4,609.43 6,088.40 5,589.89 5,972,125.19 344,111.41 5.86 5,464.68 MWD+IFR2+SAG+MS(6) 10,683.38 46.54 307.50 4,745.57 4,672.12 6,131.16 5,644.65 5,972,169,04 344,057.63 3.05 5,501.07 MND+IFR2+SAG+MS(6) 10,776.99 43.85 307.26 4,811.53 4,738.08 6,171.48 5,697.32 5,972,210.41 344005.68 2.88 5,544.89 MWD+IFR2+SAG+MS(6) 10,871.87 39.55 306.75 4,882.36 4,808.91 6,209.47 5,747.70 5,972,249.39 343,956.07 4.55 5,586.22 MND+IFR2+SAG+MS (6) 10,965.76 34.94 305.68 4,957.08 4,883.63 6,243.06 5,793.52 5,972,283.89 343,910.94 4.96 5,622.84 MW0+1FR2+SAG+MS(6) 11,065.49 30.81 304.74 5,040.82 4,967.37 6,274.28 5,837.72 5,972,315.99 343,867.37 4.17 5,657.00 MWD+IFR2+SAG+MS(6) 8.04/2019 12:48:20PM Page 5 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project: Western North Slope TVD Reference: CD5-98 Actual @ 73.45usft (D25) Site: CD5 Alpine West Pad MD Reference: CDS-98 Actual @ 73.45usft (D25) Well: CD5-98 North Reference: True Wellbore: CD5-9817 Survey Calculation Method: Minimum Curvature Design: CDS-980 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Azi TVD TVDSS +N(S +El -W Northing Easting DLS Section (usf) (1) r) (usft) (uslt) (usft) (usft) (ft) (ft) (°/1001 (ft) Survey Tool Name 11,164.19 28.22 304.81 5,118.00 5,044.55 6,299.20 5,873.61 5,972,341.62 343,83"9 2.92 5,684.31 MWD+IFR2+SAG+MS(6) 11,246.05 24.24 304.52 5,200.40 5,126.95 6,322.30 5,907.00 5,972,365.38 348,799.08 4.33 6,709.62 MWDAFR2+SAG+MS(6) 11,343.39 20.69 303.53 5,290.32 5,216.87 6,343.13 5,937.80 5,972,386.82 343,768.70 3.67 6,732.50 MWD+IFR2+SAG+MS(6) 11,437.88 17.83 303.36 5,379.52 5,306.07 6,360.30 5,963.81 5,972,404.51 343,743.05 3.03 6,751.41 MWD+IFR2+SAG+MS(6) 11,531.69 14.80 301.65 5,469.54 5,396.09 6,374.49 5,986.01 5,972,419.14 343,721.14 3.27 6,767.07 MWD+IFR2+SAG+MS(6) 11,625.57 10.83 293.32 5,561.07 5,487.62 6,384.28 5,004.32 5,972,429.30 343,703.02 4.65 6,778.08 MWD+IFR2+SAG+MS(6) 11,719.80 7.66 280.62 5,654.07 5,580.62 6,368.94 5,018.63 5,972,434.24 343,688.81 3.98 6,783.71 MWD+IFR2+SAG+MS(6) 11,815.53 6.93 263.41 5,749.04 5,675.59 6,389.46 6,030.64 5,972,435.0 343,676.82 2.40 5,785.04 MWD+IFR2+SAG+MS(6) 11,909.98 6.14 222.21 5,842.93 5,769.48 6,385.05 6,039.70 5,972,430.78 343,667.67 4.92 6,781.27 MWD+IFR2+SAG+MS(6) 12,003.10 7.28 196.79 5,935.43 5,861.98 6,375.72 6,04475 5,972,421.55 343,662.43 3.38 6,772.30 MWD+IFR2+SAG+MS(6) 12,094.75 7.94 181.99 6,026.28 5,952.83 6,363.83 6.046.65 5,972,409.70 343,660.30 2.25 6,760.57 MWD+1FR2+SAG+MS(6) 12,188.55 9.17 172.33 6,119.04 6,045.59 6,349.95 6.45.87 5,972,395.81 343,660.79 2.01 5,746.66 MWD+IFR2+SAG+MS(6) 12,283.55 13.04 165.19 6,212.24 6,138.79 6.332.08 6,042.12 5,972,377.87 343,66,IA9 4.32 6,728.58 MWD+IFR2+SAG+MS(6) 12,377.11 14.69 162.35 6,303.08 6,229.63 6,310.57 6,035.83 5,972,356.23 343,670.05 1.91 5,706.69 MWD+IFR2+SAG+MS (6) 12,470.49 17.85 159.87 6,392.71 6,319.26 6,285.84 6,027.31 5,972,331.34 343,678.07 3.46 6,681.44 MWD+IFR2+SAG+MS(6) 12,564.00 21.27 157.28 6,480.81 6,407.36 6,256.73 6,015.82 5,972,302.01 343,688.97 3.77 5,651.61 MWD+IFR2+SAG+MS(6) 12,650.04 24.88 154.15 6,569.15 6,495.70 6,222.47 6,000.28 5,972,267.45 343,703.82 3.97 6,616.37 MWD+IFR2+SAG+MS(6) 12,753.80 28.81 150.67 6,652.80 6,579.35 6,185.01 5,980.60 5,972,229.60 343,722.74 4.51 5,577.66 MWD+IFR2+SAG+MS(6) 12,847.33 33.01 149.04 6,733.03 6,659.58 6,143.49 5,955.45 5,972,187.61 343,746.06 4.58 6,534.60 MWD+IFR2+SAG+MS(6) 12,941.37 35.85 148.03 6,810.59 6,737.14 6,098.16 5,928.68 5,972,141.73 343,772.91 3.08 5,487.48 MWD+IFR2+SAG+MS(6) 13,036.23 40.07 145.64 6,885.37 6,811.92 6.49.36 5.896.73 5,972,092.31 343,803.88 4.71 5,436.62 MWD+IFR2+SAG+MS(6) 13,131.58 43.23 144.90 6,956.60 6,883.15 5,997.30 6,860.62 5,972,039.54 343,838.93 3.35 5,382.22 MWD+IFR2+SAG+MS(6) 13,225.49 46.57 143.66 7,023.12 6,949.67 5,943.50 5,821.91 5,971,984.98 343,876.55 3.05 5,325.91 MWD+IFR2+SAG+MS(6) 13,318.79 50.54 142.91 7,064.86 7,011.41 5,887.46 5,780.10 5,971,928.12 343,917.23 4.30 5,267.16 MWD+IFR2+SAG+MS(6) 13,414.06 53.45 143.10 7,143.51 7,070.06 5,827.51 5,734.93 5,971,857.28 343,961.18 3.06 5,204.27 MWD+IFR2+SAG+MS(6) 13,509.41 57.05 142.55 7,197.83 7,124.38 5,765.09 5,687.59 5,971,803.93 344,007.27 3.89 5,138.77 MWD+IFR2+SAG+MS(6) 13,603.25 60.11 143.08 7,246.73 7,173.28 5,701.28 5,639.19 5,971,739.17 344,054.37 3.26 6,071.82 MWD+IFR2+SAG+MS(6) 13,697.21 63.66 143.52 7,291.00 7,217.55 5,634.85 5,589.67 5,971,671.76 344,102.54 3.80 5,002.17 MWD+IFR2+SAG+MS (6) 13,791.37 67.58 143.82 7,329.86 7,256.41 5,565.76 5,538.88 5,971,601.68 344,151.94 4.17 5,929.79 MWD+IFR2+SAG+MS(6) 13,887.19 70.71 144.14 7,363.97 7,290.52 5,493.35 5,486.23 5,971,528.23 344,203.12 3.28 5,853.96 MWD+IFR2+SAG+MS (6) 13,981.66 73.42 143.76 7,393.06 7,319.61 5,420.69 5,433.34 5,971,454.53 344,254.54 2.89 5,777.87 MWD+IFR2+SAG+MS(6) 14,075.51 75.24 144.89 7,418.40 7,344.95 5,347.29 5,380.65 5,971,380.09 344,305.75 2.26 5,701.05 MWD+IFR2+SAG+MS(6) 14,120.00 76.27 144.39 7,429.35 7,355.90 5,312.12 5,355.69 5,971,349.44 344329.99 2.56 -5,664.27 Interpolated Station 7Sle" 14134.00 77.65 145.81 7,432.51 7,359.05 5,300.93 5,347.89 5,971,333.10 394,337.57 14.01 5,652.58 MM -INC _ ONLY (INC>10°)(7) 14,154.41 76.86 145.71 7,437.01 7,363.56 5,284.48-5,336.69 5,971,316.42 344,348.44 3.95 5,635.40 MWD -INC ONLY(7NC>10°)(7) 14,248.84 81.19 145.24 7,454.98 7,381.53 5,208.12 5,284.16 5,971,239.03 344399.43 4.61 5,555.69 MWD-INC_ONLY (INC>10°)(7) 14,344.65 84.98 144.78 7,466.52 7,393.07 5,130.22 5,229.63 5,971,160.06 344,452.38 3.98 5,474.21 MWD-INC_ONLY(INC>10°)(7) 14,439.17 89.98 144.33 7,470.67 7,397.22 5,053.31 5,174.88 5,971,052.08 344505.57 5.31 5.393.76 MWD+IFR2+SAG+MS(8) 14,534.05 94.93 142.94 7,465.61 7,393.16 4,977.00 5,118.70 5,971,009.66 344560.21 5.42 5,313.80 MWD+IFR2+SAG+MS(e) 8/142019 12:48.20PM Page 6 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project: Western North Slope TVD Reference: CD5-98 Actual @ 73.45usft (D25) Site: CDS Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) Well: CDS-98 North Reference: True Wellbore: CD5-981.1 Survey Calculation Method: Minimum Curvature Design: CD5-9811 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc Ail TVD TVDSS +N/ -S +E/ -W Northing Easting OLS Section (usfq r) 0 (usft) (usft) (waft) (usft) (ft) (1q (°/1001 (ft) Survey Tool Name 14,629.21 95.97 142.84 7,457.57 7,384.12 4,901.46 5.61.54 5,970,928.W 344,615.64 1.10 5,234.54 MWD -INC ONLY(INC,101)(9) 14,724.28 95.99 142.74 7,47.87 7,374.22 4,826.16 5,004.36 5,970,851.57 344,671.49 0.11 5,155.52 MWD+IFR2+SAG+MS (10) 14,818.94 91.98 142.80 7,441.09 7,367.64 4,750.98 -4,947.24 5,970,775.27 344,727.09 4.24 5,076.64 MWD+IFR2+SAG+MS (10) 14,913.59 91.90 142.13 7,437.88 7,364.43 4,675.97 4,889.61 5,970,699.13 344,783.20 0.71 4,997.88 MWD+IFR2+SAG+MS(10) 15,009.28 89.77 143.80 7,436.49 7,363.04 099.60 4,831.99 5,970,821.62 344,839.28 2.83 491776 MWD+IFR2+SAG+MS(10) 15,104.19 90.00 146.57 7,436.68 7,363.23 4,521.69 4,777.81 5,970,542.64 344891.89 2.93 4,836.39 MWD+IFR2+SAG+MS(10) 15,199.36 90.02 145.79 7,436.66 7,363.21 4,442.62 4,724.84 5,970,462.54 344,943.26 0.82 4,753.86 MWD+IFR2+SAG+MS(10) 15,293.36 90.00 149.52 7,436.65 7,363.20 4,363.22 4,674.56 5,970,382.15 344,991.94 3.97 4,671.22 MWD+IFR2+SAG+MS(10) 15,388.18 89.53 153.71 7,437.04 7,363.59 4,279.82 4,629.49 5,970,297.87 345,035.32 4.45 4,584.94 MWD+IFR2+SAG+MS(10) 15,483.18 89.54 155.83 7,437.81 7,364.36 4,193.89 4,589.00 5,970,211.15 345,074.08 2.23 4,496.46 MWD+IFR2+SAG+MS(10) 15,578.46 89.62 157.17 7,438.51 7,365.00 4,106.52 4,551.01 5,970,123.04 345,110.31 1 A 4,40070 MWD+IFR2+SAG+MS(10) 15,673.48 89.57 155.09 7,439.18 7,365.73 4,019.63 4,512.56 5,970,035.41 345,147.00 2.19 4,317.0 MWO+IFR2+$AG+MS (10) 15,768.09 89.67 152.93 7,439.80 7,366.35 3,934.60 4,471.10 5,969,949.57 345,186.75 2.29 4,229.74 MWD+IFR2+SAG+MS(10) 15,862.94 90.34 152.68 7,439.80 7,366.35 3,850.23 4,427.76 5,969,864.36 345,228.39 0.75 4,142.62 MWD+IFR2+SAG+MS(10) 15,958.44 89.96 153.35 7,439.55 7,366.10 3,765.13 4,384.42 5,969,778.41 345,270.01 0.81 4,054.77 MWD+IFR2+SAG+MS(10) 16,053.13 91.08 152.22 7,438.69 7,365.24 3,680.93 4,341.12 5,969,693.37 345,311.61 1.68 3,967.82 MWD+IFR2+SAG+MS(10) 16,147.22 90.53 151.81 7,437.37 7,363.92 3,597.85 4,296.97 5,969,609.43 345,354.08 0.73 -3,881.93 MWD+IFR2+SAG+MS (10) 16,243.39 90.34 153.08 7,436.63 7,%3.18 3,512.59 4.252.49 5,969,523.30 345,396.85 1.34 41,793.84 MWD+IFR2+SAG+MS(10) 16,335.05 89.94 152.83 7,436.41 7,362.96 3,430.96 4,210.81 5,969,440.85 345,436.88 0.51 -3,709.56 MWD+IFR2+SAG+MS(10) 16,433.28 90.02 153.40 7,436.45 7,363.00 3,343.34 4,166.39 5,969,352.38 345,479.53 0.59 3,619.12 MWD+IFR2+SAG+MS(10) 16,525.42 90.02 150.44 7,435.41 7,362.96 3,262.06 4,123.03 5,969,270.24 345,521.25 3.21 -3,535.07 MWD+IFR2+SAG+MS(10) 16,622.76 89.99 151.63 7,436.40 7,%2.95 3,176.90 4,075.89 5,969,184.16 345,566.67 1.22 3,446.90 MWD+IFR2+SAG+MS (10) 16,716.99 89.93 150.42 7,436.47 7,363.02 3,094.6 4,030.24 5,969,100.84 345,610.66 1.29 -3,361.55 MWD+IFR2+SAG+MS (10) 16812.02 89.72 150.39 7,436.76 7,363.31 3,011.83 -3,983.31 5,969,017.29 345,655.92 0.22 3,275.92 MWD+IFR2+SAG+MS(10) 16,908.23 89.26 148.17 7,437.62 7,364.17 2,929.13 -3,934.17 5,968,933.62 345,703.39 2.36 -3,190.07 MWD+IFR2+SAG+MS(10) 17,002.01 89.34 148.70 7,438.76 7,365.31 2,849.23 -3,885.08 5,968,852.76 345,750.87 0.57 41,107.01 MWD+IFR2+$AG+MS(10) 17,096.02 89.38 148.23 7,439.81 7,366.36 2,769.11 -3,835.91 5,968,771.68 345,798.41 0.50 -3,023.73 MWD+IFR2+SAG+MS (10) 17,193.16 88.57 150.40 7,441.55 7,368.10 2,685.59 -3,785.35 5,968,687.19 345,846.29 2.38 -2,937.03 MWD+IFR2+SAG+MS(10) 17,287.62 88.56 151.66 7443.92 7,370.47 2,602.98 -3,740.62 5,968,603.68 345,890.36 1.33 -2,851.50 MWD+IFR2+SAG+MS(10) 17,382.56 90.01 156.07 7,445.10 7,371.65 2,517.77 -3,698.81 5,968,517.67 345,930.44 4.89 -2.763.65 MWD+IFR2+SAG+MS(10) 17,477.87 89.74 161.88 7,445.31 7,371.86 2,428.85 3,664.63 5,968,428.08 345,962.83 6.10 -2,672.60 MWD+IFR2+SAG+MS(10) 17,573.87 89.88 163.98 7,445.63 7,372.18 2,337.08 3,636.45 5,968,335.77 345,989.16 2.19 -2,579.13 MWD+IFR2+SAG+MS(10) 17,668.24 86.06 160.01 7,448.97 7,375.52 2,247.42 -3,607.32 5,966245.55 346,016.50 5.84 -2,487.70 MWD+IFR2+SAG+MS(10) 17760.11 85.14 157.76 7,455.02 7,382.57 2,161.98 3,574.32 6968,159.48 346047.77 2.64 -2,400.21 MWD+IFR2+SAG+MS(10) 17,856.82 84.17 151.58 7,465.04 7,391.59 2,074.99 3,533.15 5,968,071.69 346,087.19 6.44 -2,310.62 MWD+IFR2+SAG+MS (1 D) 17,951.38 86.19 148.47 7,472.99 7,399.54 1,993.38 3,486.08 5,967,989.16 346,132.61 3.91 -2,226.00 MWD+IFR2+SAG+MS(10) 18,047.75 89.78 146.84 7,476.37 7,402.92 1,912.03 -3,434.56 5,967,906.80 346182.49 4.09 -2,141.33 MWD+IFR2+SAG+MS(10) 16143.31 89.57 146.91 7,476.92 7,403.47 1,832.00 3,382.34 5,967,825.75 346,233.09 0.23 -2,057.93 MWD+IFR2+SAG+MS(10) 18,238.63 89.96 148.25 7,477.31 7,403.86 1,751.54 -3,331.24 5,967,744.28 346282.56 1.46 -1,974.18 MWD+IFR2+SAG+MS(10) 18,333.19 89.60 148.44 7,477.67 7,404.22 1,671.05 -3,281.61 5,W7,652.82 346,330.56 0.43 -1,890.50 MWD+IFR2+SAG+MS(10) 81142019 12:48.20PM Page 7 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversicn Local Coordinate Reference: Well CD5-98 Pmjsct: Western North Slope TVD Reference: CD5-98 Actual @ 73.45usft (D25) Site: CD5 Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) MN: CDS-98 North Reference: True Wellbore: CD5-981-1 Survey Calculation Method: Minimum Curvature Design: CD5-981-1 Database: EDT 14 Alaska Production Survey Map Mop Vertical MD Inc Azl TVD TVDSS +WS +E1 -W Northing Easting OLS Section (usft) (1) P) (usft) lust" (usft) (usf" (t" (ft) (°/100') (ft) Survey Tool Name 18,427.45 89.70 149.34 7,478.25 7,404.80 1,590.35 -3,232.91 5,967,581.17 346,377.63 0.98 -1,806.67 MWDHFR2+SAG+MS(10) 18,523.06 90.79 149.13 7,477.84 7,404.39 1,508.20 -3,184.01 5,967,498.06 346,424.88 1.16 -1,721.38 MWDNFR2+SAG+MS(10) 18,617.37 90.63 149.10 7,476.67 7,403.22 1,427.27 -3,135.60 5,967,416.18 346,471.65 0.17 -1,637.34 MWD -INC -ONLY (INC,10') (11) 18,713.94 90.72 149.07 7,475.53 7,402.08 1,344.42 .7,085.99 5,967,332.36 346,519.59 0.10 -1,551.31 MWD+IFR2+SAG+MS(12) 18,8W.72 90.68 150.15 7,474.37 7,400.92 1,262.67 3,038.05 5,967,249.67 346,565.88 1.14 -1,466.49 MWD+IFR2+SAG+MS (12) 18,903.89 89.83 149.32 7,473.95 7,400.50 1,180.48 -2,990.08 5,967,166.54 346,612.19 1.25 -1,381.22 MWD+IFR2+SAG+MS(12) 18,998.34 88.66 148.97 7,475.19 7,401.74 1,099.40 -2,941.65 5,967,084.52 346,658.99 1.29 -1,297.04 MWD+IFR2+SAG+MS(12) 19,093.51 88.68 149.06 7,477.40 7,403.95 1,017.84 -2,892.67 5,967,001.99 346,706.32 0.10 -1,212.33 MWD+IFR2+SAG+MS(12) 19,168.28 88.72 149.36 7,479.55 7,406.10 936.45 -2,844.17 5,966,919.65 346,753.18 0.32 -1,127.82 MWD+IFR2+SAG+MS(12) 19,283.51 88.75 151.42 7,481.65 7,408.20 853.68 -2,797.13 5,966,835.96 346,798.54 2.16 -1,042.05 MWD+IFR2+SAG+MS (12) 19,378.90 88.78 156.06 7,483.71 7,410.26 768.17 -2,754.94 5,966,749.64 346,839.00 4.86 -953.87 MWD+1FR2+SAG+MS(12) 19,474.90 88.90 157.95 7,485.66 7,412.21 679.82 -2,717.45 5,966,660.56 346,874.72 1.97 -863.18 MWD+IFR2+SAG+MS(12) 19,569.65 68.68 156.26 7,487.66 7,414.21 592.56 -2,680.60 5,9W572.59 346,909.81 1.80 -773.61 MWD+IFR2+SAG+MS(12) 19,664.73 88.53 152.25 7,489.97 7,416.52 506.96 -2,639.32 5,966,486.18 346,999.36 4.22 -685.40 MWD+IFR2+SAG+MS(12) 19,759.28 89.11 147.79 7,491.92 7,418.47 425.10 -2,592.10 5,965,403.40 346,994.93 4.76 -600.51 MWD+IFR2+SAG+MS(12) 19,853.21 89.21 148.65 7,493.30 7,419.85 345.26 -2,542.63 5,966,322.59 347,042.78 0.92 -5517.49 MWD+IFR2+SAG+MS(12) 19,949.68 88.85 147.24 7,494.93 7,421.48 263.52 -2,491.44 5,966,239.84 347,092.32 1.51 -432.45 MWD+IFR2+SAG+MS(12) 20,044.55 88.92 142.32 7,496.78 7,423.33 186.05 -2,4W.75 5,966,161.30 347,145.44 5.19 ]51.44 MWD+IFR2+SAG+MS(12) 20,138.74 89.11 141.37 7,498.40 7,424.95 112.00 -2,378.57 5,966,086.10 347,202.12 1.03 -273.60 MWD+IFR2+SAG+MS (12) 20,234.79 88.98 145.94 7,500.00 7,426.55 34.66 -2,321.67 5,966,007.65 347,257.6 4.76 -19258 MWD+IFR2+SAG+MS(12) 20,328.15 89.69 150.99 7,501.08 7,427.63 -04.88 -2,272.86 5,965,927.15 347,304.66 5.46 -109.90 MWD+IFR2+SAG+MS(12) 20.424.22 89.6 150.85 7,501.80 7,428.35 -128.84 -2,226.17 5,965,842.28 347,349.66 0.28 -2Z% MWD+IFR2+SAG+MS(12) 20,519.64 9020 148.16 7,502.08 7,428.63 -211.05 -2,177.76 5,965,759.12 347,396.42 2.92 62.36 MWD+IFR2+SAG+MS(12) 20,614.89 90.35 163.28 7,501.62 7,428.17 -294.10 -2,131.19 5,965,675.16 347,441.31 5.38 148.39 MWD+IFR2+SAG+MS(12) 20,708.54 91.11 154.41 7,500.43 7,426.98 378.15 -2,089.91 5,965,590.31 347,480.89 1.45 235.05 MWD+IFR2+SAG+MS(12) 20,804.19 90.36 152.69 7,499.20 7,425.75 -463.78 -2,47.31 5,965,503.85 347,521.76 1.96 323.38 MWD+IFR2+SAG+MS(12) 20,898.84 89.80 149.90 7,499.07 7,425.62 596.79 -2,001.86 5,965,419.95 347,565.54 3,1 409.29 MWD+IFR2+SAG+MS(12) 20,995.71 89.88 150.28 7,499.34 7,425.89 -630.76 -1,953.55 5,965,335.04 347,612.15 0.40 496.35 MWD+IFR2+SAG+MS(12) 21,090.96 90.12 151.94 7499.34 7,425.89 -714.15 -1,907.54 5,965,250.75 347,656.48 1.76 582.68 MWD+IFR2+SAG+MS(12) 21,184.25 90.51 155.97 7,498.83 7,42538 -797.95 -0,866.58 5,965,166.15 347,695.74 4.39 669.07 MWD+IFR2+SAG+MS(12) 21,279.22 90.64 156.32 7,497.87 7,424.42 -884.80 -1,828.18 5,965,078.56 347,732.90 0.39 756.34 MWD+IFR2+SAG+MS(12) 21,373.98 90.75 154.86 7,496.72 7,423.27 A71.09 -1,789.04 5,964,991.51 347,769.80 1.52 897.09 MM+IFR2+SAG+MS(12) 21,470.63 90.53 156.0 7,495.64 7,422.19 -1,059.12 -1,749.17 5,964,902.70 397807.89 1.59 937.63 MWD+IFR2+SAG+MS(12) 21,564.36 90.68 156.77 7,494.65 7,421.20 -1,145.13 -1,711.93 5,964,815.97 347,893.40 0.43 1,025,8 MWD+IFR2+SAG+MS(12) 21,659.52 90.67 159.09 7,493.53 7,420.08 -1,233.30 -1,676.18 5,964,727.10 347,877.38 2.44 1,116.38 MWD+IFR2+SAG+MS (12) 21,754.79 90.72 158.67 7,492.38 7,418.93 -1,322.17 -1,641.85 5,964,637.57 347,909.91 0.44 1,207.37 MWD+IFR2+SAG+MS(12) 21,850.16 89.% 160.19 7,491.81 7,418.36 -1,411.45 -1,608.35 5,964,547.64 347,941.62 1.78 1,298.73 MWD+IFR2+SAG+MS(12) 21,945.64 90.48 160.12 7,491.44 7,417.99 -1,501.26 -1,575.93 5,964,457.21 347,972.23 0.55 1,390.54 MWD+IFR2+SAG+MS(12) 22,041.05 90.63 162.56 7,490.52 7,417.07 -1,591.65 -1,545.41 5,964366.24 348,000.93 2.56 1,482.79 MWD+IFR2+SAG+MS (12) 22,135.98 90.99 160.60 7,489.18 7,415.73 -1,681.70 -1,515.42 5,964275.61 348,029.11 2.10 1,574.67 MWD+IFR2+SAG+MS(12) 8/14!2018 12.48.20PM Page 8 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Coordinate Reference: Well CD5-98 Project: Western North Slope TVD Reference: CD5-98 Actual @ 73.45usft (D25) Sits: CDS Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) Wan: CDS-98 North Reference: True Waltham: CDS-981-1 Survey Calculation Method: Minimum Curvature Design: CDS-981.1 Database: EDT 14 Alaska Production Survey 81142019 12:48:20PM Page 9 COMPASS 5000.14 Build 85H Map Map Vertical MD Inc Azi TVD TVDSS +N/.R +E/ -W Northing Easting DLS Section WI) (*) P) (craft) loan) (uaft) (usfry (tq (ft) (°/1001 (ft) Survey Tool Name 22,232.04 90.09 15379 7,488.27 7,414.82 -1,770.19 -1,476.21 5,964,186.40 348,064.53 7.15 1,665.49 MM+IFR2+SAG+MS (12l 22,327.0 91.09 151.25 7,487.29 7,413.84 -1,85478 -0,434.21 5,964,100.95 348,106.82 2.86 1,752.88 MWD+IFR2+5AG+MS(12) 22,422.15 91.15 148.96 7,465.49 7,411.99 -1,935.90 -1,387.00 5,964,017.90 348,152.3B 2.42 1,838.02 MWD+IFR2+SAG+MS(12) 22,516.59 91.20 148.40 7,483.50 7,410.05 -2,017.56 -1,337.92 5,963,936.28 348,199.83 0.60 1,921.84 MWD+IFR2+5AG+MS(12) 22,611.62 91.09 148.12 7,481.60 7408.15 -2,098.36 -1,287.94 5,963,854.50 348,248.18 0.32 2,005.85 MWD+IFR2+SAG+MS(12) 22,705.40 90.68 148.04 7,480.14 7,406.69 -2,178.80 -1,237.83 5,963,773.08 348,296.66 0.44 2,089.52 MWD+IFR2+SAG+MS(12) 22,801.10 89.91 148.58 7,479.65 7,406.20 -2,259.38 4,188.09 5,963,691.53 348,344.78 0.99 2,173.29 MWD+IFR2+SAG+MS(12) 22,896.72 89.40 148.27 7,480.23 7,406.78 -2,340.84 -1,138.02 5,963,609.09 348,393.20 062 2,257.97 MWD+IFR2+SAG+MS(12) 22,991.70 89.34 152.25 7,481.27 7,407.82 -2,423.29 -1,090.91 5,963,525.72 348,438.64 4.19 2,343.44 MWD+IFR2+SAG+MS(12) 23,086.96 89.21 154.61 7,4B2.48 7,409.03 -2,508.48 -1,048.31 5,963,439.70 348,479.53 2.48 2431.32 MWD+IFR2+SAG+MS(12) 23,182.87 88.92 155.02 7,484.04 7,410.59 -2,595.26 -1,007.50 5,963,352.13 348,518.58 0.52 2,520.68 MWD+IFR2+SAG+MS(12) 23,278.04 88.93 154.29 7,485.83 7,412.38 -2,681.25 -966.77 5,963,265.34 348,557.5B 0.77 2,609.25 MWD+IFR2+5AG+MS(12) 23,372.76 88.69 15530 7,487.79 7,414.34 -2,766.93 .26.44 5,963,178.87 348,596.18 1.10 2,697.47 MWD+IFR2+SAG+MS(12) 23,468.06 88.28 154.61 7,490.31 7,416.85 -2,853.26 -886.11 5,963,091.76 348,634.78 0.84 2,786.35 MWD+IFR2+SAG+MS(12) 23,562.63 89.53 155.54 7,492.12 7,418.67 -2,938.99 -M17 5,963,00.5.26 348,672.89 1.65 2,874.58 MWD+IFR2+SAG+MS(12) 23,657.93 89.12 153.43 7,493.24 7,419.79 -3.024.98 -805.22 5,962,918.47 348,712.20 2.26 2,963.17 MWD+IFR2+SAG+MS(12) 23,752.71 89.21 153.04 7,494.63 7,421.18 -3,109.60 -762.55 5,962,833.02 348,753.17 0.42 3,050.50 MWD+IFR2+SAG+MS(12) 23,844.15 90.31 156.23 7,49501 7,421.55 -3,192.21 -723.38 5,962,749.65 348,790.67 3.69 3,135.58 MWD+IFR2+SAG+MS (12) 23,943.41 90.36 154.57 7,494.43 7,420.98 -3,282.46 -682.06 5,962,658.60 348,830.17 1.67 3,228.43 MWD+IFR2+SAG+MS(12) 24,038.90 90.41 151.20 7,493.79 7,420.34 -3,367.44 4138.55 5,962,572.77 348,871.97 3.53 3,316.18 MWD+IFR2+SAG+MS(12) 24,132.88 89.77 148.84 7,493.64 7,420.19 -3,448.84 -891.59 5,962,490.5 348,917.28 2.60 3,400.58 MWD+IFR2+SAG+MS(12) 24,230.41 89.96 147.51 7,493.87 7,420.42 -3,531.70 -540.16 5,962,406.58 348,967.04 1.38 3,486.76 MWD+IFR2+SAG+MS(12) 24,325.51 89.70 149.94 7,494.15 7,420.70 41,612.98 -490.79 5,962,324.34 349,014.76 2.57 3,571.20 MWD+IFR2+SAG+MS(12) 24,420.42 89.89 151.32 7,494.49 7,421.04 -3,695.68 444.25 5,962,240.72 349,059.64 1.47 3,656.89 MWD+IFR2+SAG+MS(12) 24,515.84 88.98 151.76 7,495.43 7,421.98 -3,779.57 -39878 5,962155.95 349,103.42 1.06 3,743.67 MWD+IFR2+SAG+MS(12) 24.611.31 Was 152.90 7,497.21 7,423.76 -3,864.10 -354.45 5,962,070.55 349,146.04 1.20 3,831.02 MWD+IFR2+SAG+MS(12) 24,706.23 89.28 156.02 7,498.74 7,425.29 -3,949.73 -313.54 5,961,984.13 349,185.22 3.31 3,919.23 MWD+IFR2+SAG+MS(12) 24,800.98 89.55 156.20 7,499.71 7,426.26 4,036.35 -275.17 5,961,896.76 349,221.85 0.34 4,008.27 MWD+IFR2+SAG+MS(12) 24,896.83 89.72 156.35 7,600.32 7,426.87 4,124.10 -236.61 5,961,808.26 349,258.64 0.24 4,098.44 MWD+IFR2+SAG+MS(12) 24,991.46 88.87 154.89 7,501.48 7,428.03 4,210.28 -197.55 5,961,721.32 349,295.96 1.79 4,187.08 MWD+1FR2+5AG+MS(12) 25,086.17 86.91 154.26 7,504.97 7,431.52 4,295.76 -156.92 5,961,635.06 349,334.8] 2.17 4,275.12 MWD+IFR2+SAG+MS(12) 25,182.46 86.16 155.65 7,51079 7,437.34 4,382.83 -116.23 5,961,547.19 349,373.80 1.64 4,364.76 MWD+IFR2+SAG+MS(12) 25,275.02 84.03 154.73 7,518.70 7,445.25 4,466.54 -77.54 5,961,462.73 349,410.81 2.51 4,450.91 MWD+IFR2+SAG+MS(12) 25,371.63 84.69 153.96 7,528.20 7,454.75 4,553.20 -35.91 5,961,375.26 349,450.69 1.05 4,540.20 MWD+IFR2+SAG+MS(12) 25,467.43 87.86 151.52 7,534.42 7,460.97 4,638.16 7.87 5,961,289.45 349,492.75 4.17 4,627.94 MM+IFR2+5AG+MS (12) 25,563.87 88.93 148.75 7,537.12 7,463.67 4,721.75 55.87 5,961,204.92 349,539.07 3.08 4,714.61 MWD+IFR2+SAG+MS (12) 25,659.93 89.26 143.00 7538.64 7465.19 4,801.23 109.73 5,961,124.38 349,591.32 5.99 4,797.55 MWD+IFR2+SAG+MS(12) 25,754.76 90.05 144.41 7,539.21 7,465.76 4,877.65 165.86 5,961,046.85 349,645.90 170 4,877.63 MWD+IFR2+SAG+MS(12) 25,848.79 88.22 147.63 7,539.81 7,466.36 4,955.61 218.41 5,960,967.86 349,696.87 3.54 4,958.99 MWD+IFR2+SAG+MS (12) 25,944.41 88.85 149.34 7,541.42 7,467.97 b,03TQ 268.38 5,960,885.38 349,745.20 1.83 5,043.70 MWO+1FR2+5AG+MS(12) 81142019 12:48:20PM Page 9 COMPASS 5000.14 Build 85H ConocoPhillips Definitive Survey Report Company: NADConversion Local Co-ordinate Reference: Well CD5-98 Project: Western North Slope TVD Reference: CD5-98 Actual @ 73.45usft (025) She: CDS Alpine West Pad MD Reference: CD5-98 Actual @ 73.45usft (D25) Well: CD5-98 North Reference: True Wellbore: CD5-981-1 Survey Calculation Method: Minimum Curvature Design: CD5-981-1 Database: EDT 14 Alaska Production Survey Map Map Vertical MD Inc AzI TVD TVDSS +N/S +E/ -W Northing Seating DLS Section (usm (') (9 (usft) (waft) (usft) (wft) 01) (1q (°/1001) (ft) Survey Tool Name 26,039.72 88.71 155.66 7,543.45 7,470.00 5,121.60 312.36 5,960,800.04 349,787.47 6.63 5,130.98 MWD+IFR2+SAG+MS(12) 26,135.40 88.92 157.02 7,545.43 7,471.98 -5,209.21 350.74 5,960,711.68 349.824.10 1.44 8221.00 MWD+IFR2+$AG+MS(12) 26,229.84 89.41 155.24 7,546.81 7,473.35 5,295.56 388.96 5,960,624.59 349,860.57 1.95 5,309.75 MWD+IFR2+SAG+MS(12) 26,325.03 89.19 148.58 7,547.97 7,474.52 5,379.49 433.75 5,960,539.79 349,903.66 7.00 5,396.53 MWD+IFR2+SAG+MS(12) 26,420.82 91.78 147.60 7,547.16 7,473.71 5,460.79 484.37 5,960,457.50 349,952.65 2.89 5,481.9 MWD+IFR2+SAG+MS (12) 26,516.66 91.71 148.74 7,544.24 7,470.79 5,542.18 534.90 5,960,375.12 350,001.53 1.19 5,565.73 MWD+IFR2+SAG+MS(12) 26,611.51 91.42 150.28 7,591.65 7,468.20 5,623.88 583.00 5,960,292.48 350,047.9B 1.65 5,650.51 MWD+IFR2+SAG+MS(12) 26,706.50 91.75 152.79 7,539.02 7,465.57 5,707.35 628.26 5,960,206.13 350,091.55 2.66 5,736.87 MWD+IFR2+SAG+MS(12) 26,801.18 88.90 155.05 7,538.49 7,465.04 5,792.37 669.87 5,960,122.29 350,131.45 3.84 5,824.53 MWD+IFR2+SAG+MS(12) 26,825.00 89.02 153.61 7,538.92 7,465.47 5,813.83 680.19 5,960,100.63 350,141.34 6.05 5,846.65 Interpolated Station 412" 26,897.86 89.41 149.22 7,539.91 7,466.46 5,877.79 715.03 5,960,035.99 350,174.89 6.05 5,912.83 MWD+IFR2+SAG+MS(12) 26,992.65 89.23 147.98 7,541.04 7,467.59 5,958.69 764.42 5,959,954.12 350,222.69 1.32 5,996.90 MWD+IFR2+SAG+MS (12) 27,088.11 89.20 14B.12 7,542.35 7,468.90 5,039.68 814.93 5,959,872.14 350,271.51 0.15 6,081.14 MWD+IFR2+SAG+MS (12) 27,183.50 89.20 147.97 7,543.68 7,470.23 6,120.61 865.41 5,959,790.22 350,320.36 0.16 6,165.32 MWD+IFR2+SAG+MS(12) 27,278.95 89.27 147.50 7,544.95 7,471.50 5,201.32 916.36 5,959,708.52 350,369.68 0.50 6,249.30 MWD+IFR2+SAG+MS(12) 27,374.01 89.38 150.15 7,546.07 7,472.62 6,282.64 965.56 5,959,626.24 350,417.24 2.79 6,333.78 MWD+IFR2+SAG+MS(12) 27,469.04 89.38 152.68 7,547.10 7,473.65 5,366.07 1,011.02 5,959,541.92 350,461.01 2.66 6,420.11 MWD+IFR2+SAG+MS(12) 27,564.34 89.23 154.42 7,548.26 7,474.81 6,451.39 1,053.46 5,959,455.77 350,501.74 1.83 6,508.12 MWD+IFR2+SAG+MS(12) 27,659.71 89.27 154.42 7,549.51 7,476.06 5,537.40 1,094.64 5,959,368.96 350,541.18 0.04 6,596.74 MWD+IFR2+SAG+MS (12) 27,755.49 89.23 153.49 7,550.76 7,477.31 6,623.45 1,136.69 5,959,282.09 350,581.49 0.97 6,685.44 MWD+IFR2+SAG+MS(12) 27,850.15 89.30 153.87 7,551.97 7,478.52 5,708.28 1,178.66 5,959,196.44 350,621.75 0.41 6,772.94 MWD+IFR2+SAG+MS(12) 27,945.77 89.51 157.48 7,552.97 7,479.52 6,795.40 1,218.03 5,959,108.56 350,659.37 3.78 6,862.53 MWD+IFR2+SAG+MS(12) 28,041.11 89.68 161.20 7,553.64 7,480.19 5,884.59 1,251.67 5,959,018.72 350,691.21 3.91 6,953.81 MWD+IFR2+SAG+MS(12) 28,135.97 89.89 165.12 7,554.0 7,480.55 6,975.36 1,279.14 5,958,927.42 350,716.86 4.14 7,046.24 MWD+IFR2+SAG+MS(12) 28,231.01 89.95 165.92 7,554.13 7,480.68 -7,067.38 1,302.90 5,958,834.95 350,738.77 0.84 7,139.66 MWD+IFR2+SAG+MS(12) 28,327.6 90.03 163.62 7,554.15 7,480.70 -7,160.05 1,328.13 5,958,741.80 350,762.14 2.40 7,233.64 MWD+IFR2+SAG+MS(12) 28,421.68 89.98 161.79 7,554.14 7,480.69 -7,250.39 1,366.26 5,958,650.92 350,788.45 1.93 7,325.88 MWD+IFR2+SAG+MS(12) 28,517.07 90.50 161.39 7,553.74 7,480.29 -7,340.90 1,386.39 5,958,559.84 350,816.75 0.69 7,418.23 MWD+IFR2+SAG+MS(12) 28,611.14 89.10 159.27 7,554.07 7,480.62 -7,429.47 1,418.05 5,958470.66 350,846.63 2.70 7,508.75 MWD+IFR2+SAG+MS(12) 28,706.20 89.38 157.58 7,555.33 7,481.88 -7,517.86 1,453.00 5,958,381.59 350,879.80 1.80 7,599.31 MWD+iFR2+SAG+MS(12) 28,802.43 89.45 156.69 7,556.31 7,482.86 -7,606.52 1,490.39 5,958,292.20 350,915.40 0.93 7,690.31 MWD+IFR2+SAG+MS(12) 28,896.23 89.12 152.55 7,557.48 7,484.03 -7,691.25 1,530.57 5,958,206.70 350,953.88 4.42 7,777.58 MWD+IFR2+SAG+MS(12) 28,991.28 89.40 151.72 7,558.71 7,485.26 -7,775.27 1,574.99 5,958,121.80 350,996.60 0.93 7,864.43 MWD+IFR2+$AG+MS(12) 29,087.30 89.76 150.16 7,559.41 7,485.96 -7,859.20 1,621.63 5,958,036.97 351,041.54 1.67 7,951.33 MWD+IFR2+SAG+MS(12) 29,183.66 89.04 147.66 7,560.42 7,486.97 -7,941.71 1,671.38 5,957,953.48 351,089.63 2.70 8037.04 MWD+IFR2+SAG+MS(12) 29,277.39 89.55 146.12 7,561.58 7,488.13 41,020.21 1,722.57 5,957,873.98 351,139.23 1.73 8118.84 MWD+IFR2+SAG+MS(12) 29,372.80 89.74 144.23 7,562.17 7,488.72 6,098.53 1,777.05 5,957,794.59 351,192.13 1.99 8,200.68 MWD+IFR2+SAG+MS(12) 29,420.46 90.10 143.48 7,562.23 7,488.78 5,137.01 1,805.16 5,957,755.55 351,219.46 1.75 8240.99 MWD+IFR2+SAG+MS(12) 29,480.00 ' 90.10 143.8 7,562.13 7,488.68 6,164.86 1,840.60 5,957,707.01 351,253.93 0.00 8,291.14 PROJECTED 0 TO 8/1412019 12:48:20PM Page 10 COMPASS 5000.14 Build 85H Company: NADConversion Project: Western North Slope Slits: CD5 Alpine West Pad Well: CDS-98 Wellbore: CDS-98L1 Design: CD5-98L1 Survey MD Inc Azi TVD TVDSS *N/S (usft) (") (°) (usft) (usft) (usft) 61/2' ON ConocoPhillips Definitive Survey Report Local Coordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Database: Well CD5-98 CDS-98 Actual @ 73.45usft (D25) CD5-98 Actual @ 73.45usft (D25) True Minimum Curvature EDT 14 Alaska Production Map Map Vertical +El -W Northing Easting US Section (usft) (ft) Ift) (°/100) (ft) Survey Tool Name 8/142019 12:48:20PM Page 11 COMPASS 5000.14 Build 85H Cement Detail Report CD5-98 Job: String: Conductor Cement DRILLING ORIGINAL, 6/4/201912:00 Cement Details Description Conductor Cement 13/10/201918 Cementing Start Date 00 Cementing End Date 3/10/2019 18:00 Wellbore Name CD5-98 Comment 10 yards cement Cement Stages Stage # 1 Description Conductor Cement Objective Top Depth (ftKB) 84.0 Bottom Depth (ftKB) 115.0 Full Return? No Vol Cement... Top Plug? No Btm Plug? No Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? No Stroke (ft) Rotated? No I Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment 10 yards of cement poured down annulus. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Yield (ft /sack) Mix H2O Ratio (gal/sa... Free Water (%) Density (Ib/gal) Plastic Viscosity top) Thickening Time (hr) CmprStr t (psi) Additives Additive Type Concentration Cone Unit label Page 1/1 Report Printed: 9/5/2019 Page 111 ReportPrinted: 9/5/20191 Cement Detail Report CD5-98 Job: String: Surface Cement DRILLING ORIGINAL, 6/4/2019 12:00 Cement Details DescriptionCementing Surface Cement I6/9/201913:45 Start Date Cementing End Date 16/9/201917:55 Wellbore Name CD5-98 Comment Cement Stages Stage # 1 Description Surface Cement Objective I Top Depth (ftKB) 39.2 Bottom Depth (ftKB) 2,296.0 Full Return? No Vol Cement... 110.0 Top Plug? Yes Btm Plug? Yes Q Pump Init (bbl/m... 4 Q Pump Final (bbl/... 34 10 Pump Avg (bbl/... P Pump Final (psi) 540.0 P Plug Bump (psi) 1,037.0 Recip? Yes Stroke (ft) 16.00 Rotated? I No Pipe RPM (rpm) Tagged Depth (ftKB) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Mud Push recieved at Surface at 267 bbl of job away. Lead slurry pumping stopped once Lead slurry received at surface after 302.6 pumped. 60.2 bbls of Tail pumped. Plug bumped @ 17:25 Cement Fluids & Additives Fluid Fluid Type Surface Lead Cement Fluid Description Estimated Top (ftKB) 39.1 Est Btm (ftKB) 1,774.9 Amount (sacks) 890 Class CD CRETE Volume Pumped (bbl) 302.6 Yield (ft'/sack) 1.91 Mix H2O Ratio (gal/sa... 6.65 Free Water (%) Density (Ib/gal) 11.00 Plastic Viscosity (cP) ThickeningTime hr 35.00 ( 1 Cm rStr t P (Psi) Additives Additive Type Concentration Cone Unit label Fluid Fluid Type Surface Tail Cement Fluid Description Estimated Top (ftKB) 1,774.9 Est Btm (ftKB) 2,296.0 Amount (sacks) 292 Class G Volume Pumped (bbl) 60.2 Yield (ft'/sack) 1.16 Mix H2O Ratio (gal/sa... 5.00 Free Water (%) Density (Ib/gap 15.80 Plastic Viscosity (cP) Thickening Time (hr) 18.00 CmprStr 1 (psi) Additives Additive Type Concentration Cone Unit label Page 111 ReportPrinted: 9/5/20191 Cement Detail Report CDS-98 String: Intermediate Casing Cement Job: DRILLING ORIGINAL, 6/4/2019 12:00 Cement Details Description Cementing Start Date Cementing End Date Wellbore Name Intermediate Casing Cement 6/23/201914:00 6/23201918:15 CD5-98 Comment Packed off when 16 bbls cemt out shoe, varied pump rate to obtain best returns, lost 29 bbls cmt of the 99 pumped. Cement Stages Stage # t Description Objective Top Depth (ftKB) Bottom Depth (ftKB) Full Return? Ivol Cement... I Top Plug? Btm Plug? Intermediate Casing The greater of 500'MD or 13,239.0 14,361.9 No 0.0 Yes Yes Cement 250'TVD of cement Q Pump Init (bbl/m... Q Pump Final (bbl/... Q Pump Avg (bbl/... P Pump Final (psi) P Plug Bump (psi) Recip? Stroke (ft) Rotated? Pipe RPM (rpm) 5 13 4 557.0 1,600.0 1 Yes 13.50 No Tagged Depth (ft(B) Tag Method Depth Plug Drilled Out To (ftKB) Drill Out Diameter (in) Comment Pumped cement as per CPA]/Schlumberger cement detail while reciprocating from 14, 360'to 14,338' MD. SLB pump 60 bbls of 11.5 ppg of Mud push and dropped top plug, followed by pumping 99.1 bbls of 15.8 cement. Dropped bottom plug and pumped 20.2 bbls of H2O and SBL swapped over to rig pumps at 4.5 bpm and 452 psi. Flow out was observed at 12%, Pick-up weight — 350k, Slack-off weight 160k. Observed cement outrunning pumps based on steep hole inclination and noted the bottom plug landed early. With 16 bbls of cement out of shoe, observed pack-off and noting losses, attempt to pick up and move pipe at 90k over with no movement. Set hgr down in its appropriate profile without issue. Varied pump rate to obtain best returns, (1-3) bpm, top plug landed early at 6,136 strokes, pressure was observed at 1,600 psi. CIP at 1805 his. Total cement pumped 99 bbls, total losses, 29 bbls. Cement Fluids & Additives Fluid Fluid Type Fluid Description Estimated Top (ftKB) Est Btm (ftKB) Amount (sacks) Class Volume Pumped (bbl) Intermediate Cement 13,239.0 14,361.9 480 G 99.1 Yield (fP/sack) Mix H2a Ratio (gal/sa... Free Water (% J Density (Ib/gal) Plastic Viscosity (cP) Thickening Time (hr) CmprStr 1 (psi) 1.16 5.07 15.80 152.5 14.50 Additives Additive Type Concentration Conc Unit label Page 1/1 ReportPrinted: 9/5/20191 21go 31176 5chiumbepgop Transmittal #: 04SEP19-SP02 Drilling & Measurements Product Delivery Customer: ConocoPhillips Alaska, Inc. Dispatched To: AOGCC: Natural Resource Tech Well Name: CD5-981_1 Date Dispatched: 4 -Sep -19 Service Order #: 19AKA0050 Dispatched By: Stephanie Pacillo Product I Description Hardcopy Di ital Copv Logging Date LWD Recorded Mode Prints: N/A Contents on CD 31 -Jul -19 Scope Resistivity 2" MD 2" TVD x 5" MD x 5" TVD RECEIVED x x SEP 0 5 2019 AC GCC Digital Data N/A Contents on CD DLIS / LAS Data x Surveys N/A Contents on CD Directional Survey Nad27 x Directional Survey Nad83 x CD 1 Contents on CD Data: DLIS/ LAS x Graphics: PDF x Surveys: PDF/TXT x Please sign and email a copy to: Please sign and email a copy to: Tom Osterkamp(a)conocophillips com Alaska PTSPrintCenterCcDslb com Attn: Tom Osterkamp Attn: Stephanie Pacillo Received B Regg, James B (CED) From: Laubenstein, Lou (CED) Sent: Friday, July 5, 2019 12:45 PM � ,`1 I �I lei To: Regg, James B (CED) IVB( Subject: CD5-98 Upper IBOP test chart 7-5-19.pdf Attachments: CD5-98 Upper IBOP test chart 7-5-19.pdf, ATTO0001.htm I am happy with the last 5 minutes, small volume makes for a hard test. If you have any more concerns or aren't happy let me know. THE STAY' °fALASKA GOVERNOR MIKE DUNLEAVY Chip Alvord Drilling Manager ConocoPhillips Alaska, Inc. PO Box 100360 Anchorage, AK 99510-0360 Alaska Oil and Gas Conservation Commission Re: Colville River Field, Alpine Oil Pool, CRU CD5-98L1 ConocoPhillips Alaska, Inc. Permit to Drill Number: 219-060 Surface Location: 281' FNL, 2402' FEL, SEC. 18, T1 IN, R4E, UM Bottomhole Location: 286' FNL, 4497' FEL, SEC. 29, TI IN, R4E, UM Dear Mr. Alvord: 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.cogcc.olaska.gov Enclosed is the approved application for the permit to drill the above referenced development well. The permit is for a new wellbore segment of existing well Permit No. 219-059, API No. 50-103-20803- 00-00. Production should continue to be reported as a function of the original API number stated above. Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. This permit to drill does not exempt you from obtaining additional permits or an approval required by law from other governmental agencies and does not authorize conducting drilling operations until all other required permits and approvals have been issued. In addition, the AOGCC reserves the right to withdraw the permit in the event it was erroneously issued. Operations must be conducted in accordance with AS 31.05 and Title 20, Chapter 25 of the Alaska Administrative Code unless the AOGCC specifically authorizes a variance. Failure to comply with an applicable provision of AS 31.05, Title 20, Chapter 25 of the Alaska Administrative Code, or an AOGCC order, or the terms and conditions of this permit may result in the revocation or suspension of the permit. S' cerely, Daniel T. Seamount, Jr. Commissioner Ad DATED this_ day of May, 2019. STATE OF ALASKA AuLKA OIL AND GAS CONSERVATION COMMON PERMIT TO DRILL 20 AAC 25.005 RECEIVED APR 11 2019 1a. Type of Work: 111b. Proposed Well Class: Exploratory - Gas ❑ Service - WAG ❑ Service - Disp ic. S eci i 1I1,�s�,o for: Drill 0 Lateral ❑ Stratigraphic Test El Development - Oil P) Service - Winj El Single Zone 21Coalbed a-sk4l tes ❑ Reddll ❑ Reentry ❑ I Exploratory - Oil ❑ Development - Gas ❑ Service - Supply ❑ Multiple Zone ❑ Geothermal ❑ Shale Gas ❑ 2. Operator Name: 5. Bond: Blanket Q Single Well ❑ 11. Well Name and Number: ConocoPhillips Bond No. 59-52-180 CRU-CD5-98L1 3. Address: 6. Proposed Depth: 12. Field/Pool(s): P.O. Box 100360 Anchorage, Alaska, 99510-0360 MD: 30708 TVD: 754 Colville River Unit Alpine Pool 4a. Location of Well (Governmental Section): 7. Property Designation: W-"J4.41Ib1fl Surface: 281' FNL, 2402' FEL, Sec. 18, T11 N, R4E, UM ASRC-NPR4,ASRC-AA092344;ASRC-NPR2, ASRC-NPR3 011 8. DNR Approval Number: 13. Approximate Spud Date: Tap of Productive Horizon: 311' FNL, 2756' FEL, Sec. 12, T11 N, R3E, UM 932669, 340757, 932128, 342658 5/8/2019 9. Acres in Property: 14. Distance to Nearest Properly: Total Depth: 4599' FNL, 5002' FEL, Sec. 20, Ti 1N, R4E, UM 5032, 3122, 8838, 3200 681'to ASRC-NPR4 4b. Location of Well (State Base Plane Coordinates - NAD 27): 10. KB Elevation above MSL (ft): 74.7 15. Distance to Nearest Well Open Surface: x- 349576 y- 5965926 Zone -4 GL / BF Elevation above MSL (ft): 33.9 to Same Pool: 1465' CD5-25Li 16. Deviated wells: Kickoff depth: 625 feet 17. Maximum Potential Pressures in psig (see 20 AAC 25.Q5) rr Maximum Hole Angle: 90 degrees Downhole: 3 ��()O Surface: 2 2°f 2s .J 1/1/9 18. Casing Program: Specifications op -Setting Depth - Bottom Cement Quantity, c.f. or sacks Hole Casing Weight Grade I Coupling Length MD TVD MD TVD (including stage data) 42" 20" 78.6 B Welded 74 41 14 115 115 10 yds 13.5" 10.75" 45.5 L-80 TXP 2255 41 41 2296 2189 991 sx 11.0ppg, 271 sx 15.8ppg G 9.875x11" 7.625" 29.7 L-80 TXP 14209 41 41 14250 7514 491sx 15.8ppg Class G 6.5" 4.5" 12.2 L-80 T -Blue 16908 13800 7449 30708 7594 Lined with blank pipe and frac ports 19. PRESENT WELL CONDITION SUMMARY (To be completed for Reddll and Re -Entry Operations) Total Depth MD (ft): Total Depth TVD (ft): Plugs (measured): Effect. Depth MD (ff): Effect. Depth TVD (ft): Junk (measured): Casing Length Size Cement Volume MD TVD Conductor/Structural Surface Intermediate Production Liner Perforation Depth MD (ft): Perforation Depth TVD (ft): Hydraulic Fracture planned? Yes❑ No 7 BOP Sketch 20. Attachments: Property Plat ❑ Drilling Program Tiv. Depth Shallow Hazard Analysis Diveot rter Sketch B Seabed Report e Dring Fluid Program l e 20 AAC 25.050 requirements8 21. Verbal Approval: Commission Representative: Date 22. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Contact Name: Andy Marushack Authorized Name: Chip Alvord Contact Email: and ..marushack CO .Com Authorized Title: Drilling Manager Contact Phone: 907-265-6337 Authorized Signature: Date:DCIII 1 Commission Use Only Permit to Drill G API Number: Permit Approv 2� IC See cover letter for other Number: `���60 50- - 80 -0O Date: Z requirements. Conditions of approval : If box is checked, well r,/ may not be used to explore fpr, test, or produce coalbed methane, gas hydrates, or gas contained in shales: L7 Other: BOP fGS .DI�ISSV �G ,Yr'b 3.7 D 0 PSr15 Samples req'd: Yes E] Noy Mud log req'd: Yes❑ NoW ,�N i1 r/7 ar'7p!'! ✓P ✓I tr �" ttS1" Z S Cpli;9&basures: Yes ❑ No Q' Directional svy req'd: Yes 2' No[,--],/ Spacing exception req'd: Yes ❑ No& Inclination -only svy req'd: Yes E]Noy' Post initial injection MIT req'd: Yes ElNoL-I APPROVED BY S- / Z 119 Approved by: COMMISSIONER THE COMMISSION Date: �/ ( ///��� ^ • 1 Submit Form and (�I-'bffiL74-4 e p17 This permit is valid for �4 nRIf®�iNellf aCproval per 20 AAC 25.005 Attachatents in Dnplicater )I� ConocoPhillips Alaska, Inc. Post Office Box 100360 Anchorage, Alaska 99510-0360 Telephone 907-276-1215 April 10, 2019 Alaska Oil and Gas Conservation Commission 333 West 71 Avenue, Suite 100 Anchorage, Alaska 99501 Re: Application for Permit to Drill CRU CD5-98LI Dear Sir or Madam: ConocoPhillips ConocoPhillips Alaska, Inc. hereby applies for a Permit to Drill an onshore production well from the CD5 drilling pad with rig Doyon 25. The intended spud date for this well is 5/8/2019. CRU CD5-98L I is planned to be an Alpine C Sand upper lateral producer out of the CD5-98 parent well (covered in separate PTD). When the CD5-98LI is commenced, the parent well will have run and cemented 10-3/4" surface casing to above the C30 Sand. 7-5/8" intermediate casing will have been run and cemented to 250' TVD above the uppermost hydrocarbon bearing interval. A 6-1/2" lateral will have been drilled in the Alpine A Sand and lined with a 4-1/2" liner, with a whipstock set above for the CD5-98L I kickoff in the Alpine C Sand. The CD5-98LI lateral will then be drilled in the Alpine C Sand and partially lined with 4-1/2" liner. The well will be completed with a 4-1/2" upper completion. A waiver is requested to set the production packer approximately 1,000' above the casing shoe as per 20 AAC 25.412(b). Please find attached the information required by 20 AAC 25.005 (a) and (c) for your review. Pertinent information attached to this application includes the following: 1. Form 10-401 Application For Permit to Drill per 20 AAC 25.005 (a) 2. A proposed drilling program 3. A proposed completion diagram 4. A drilling fluids program summary 5. Pressure information as required by 20 AAC 25.035 (d)(2) 6. Directional drilling / collision avoidance information as required by 20 AAC 25.050 (b) Information pertinent to the application that is presently on file at the AOGCC: 1. Diagrams of the BOP equipment, diverter equipment and choke manifold lay out as required by 20 AAC 25.035 (a) and (b). 2. A description of the drilling fluids handling system. 3. Diagram of riser setup. If you have any questions or require further information, please contact Andy Marushack at 265-6337 (andy.j.marushack@ConocoPhillips.com) or Chip Alvord at 265-6120. Sincer ly, cc: CD5-98LI Well File / Ann Haggerty -Sherrod ATO 1530 j4X;/—� Johnson Njoku ATO 1720 Chip Alvord ATO 1570 Andy Marushack Katheryn Hoffineister ATO 1760 Drilling Engineer Lanston Chin Kuukpik Corp Applicatio Permit to Drill, Well CRU CD5-981-1 Saved: 11 -Apr -19 CD5-98L1 Application for Permit to Drill Document Table of Contents 1. Well Name (Requirements of 20 AAC 25.005 ()9)............................................................ 3 2. Location Summary (Requirements of 20 AAC 25.005(c)(2)) ............................................ 3 Requirementsof 20 AAC 25.050(b)................_........................................................................................... 3 3. Blowout Prevention Equipment Information (Requirements of20AAC 25.005(c)(3)) 3 4. Drilling Hazards Information (Requirements of20AAC 25.005 (c)(4)) ........................4 5. Procedure for Conducting Formation Integrity Tests (Requirements of 20 AAC 25.005 (c) (5))......................................................................................................................... 5 6. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) .......... 5 7. Diverter System Information (Requirements of 20AAC 25.005(c)(7)) ......................... 5 8. Drilling Fluid Program (Requirements of20AAC 25.005(c)(8)) ....................................6 9. Abnormally Pressured Formation Information (Requirements of 20 AAC 25.005 (c)(9)) ................................................................................................................................... 7 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) ......................................... 7 11. Seabed Condition Analysis (Requirements of'20 AAC 25.005 (c)(11)) ........................7 12. Evidence of Bonding (Requirements of20AAC 25.005 (c)(12)) ...................................7 13. Proposed Drilling Program (Requirements of 20 AAC 25.005 (c)(13)) .........................7 14. Discussion of Mud and Cuttings Disposal and Annular Disposal ....................... 8 (Requirements of 20 AAC 25.005(c)(14))............................................................................. 8 15. Attachments............................................................................................................... 8 Attachmentt Cement Summary................................................................................................................. 8 CD5-98L1 APD Page 1 of 15 Printed: 11 -Apr -19 Applicatiol Permit to Drill. Well CRU CD5-981-1 Saved: 11 -Apr -19 Attachment 2 Drilling Hazards Summary ................................................................................................... 8 Attachment 3 Completion Schematic ........... ......................................................................................... I..... 8 Attachment 4 Directional Plan.................................................................................................................. 8 CD5-98L1 APD Page 2 of 15 Printed. 11 -Apr -19 Applicatioi Permit to Drill, Well CRU C135-981-1 Saved: 11 -Apr -19 1. Well Name (Requirements of 20 AAC 25.005 (9) The well for which this application is submitted will be designated as CRU CD5-98L1 2. Location Summary (Requirements of20AAC25.005(c)(2)) Location at Surface 281' FNL, 2402' FEL, Sec. 18, TI 1N, ME UM NAD 1927 Northings: 5,965,926 Eastings: 349,576 RKB Elevation 74.7' AMSL Pad Elevation 33.9'AMSL Top of Productive Horizon Heel Total 311' FNL, 2756' FEL, Sec. 12, TI 1N, R3E UM NAD 1927 Northings: 5,971,282 Eastings: 344,402 Measured De th, RKB: 13,820' Total Vertical De th, RKB: 7,449' S: Total Vertical Depth, SS.- Total Depth Toe 4599' FNL, 5002' FEL, Sec. 20, Tl 1N, ME, UM NAD 1927 Northings: 5,956,276 Eastings: 352,100 Measured Depth, RKB: 30 708' Total Vertical Depth, RKB: 7,594' Total Vertical Depth, SS: 1 7-569= Requirements of20 AAC 25.050(b) Please see Attachment 4: Directional Plan The Applicant is the only affected owner. -4-97.0 SS f 3. Blowout Prevention Equipment Information (Requirements of20AAC25.005(c)(3)) Please reference BOP and diverter schematics on file for Doyon 25. CD5-98L1 APD Page 3 of 15 Printed: 11 -Apr -19 ��.0_ 'x116 j I Q Loepp, Victoria T (DOA) From: Marushack, Andy J <AndyJ.Marushack@conocophillips.com> Sent: Wednesday, May 1, 2019 7:59 AM To: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL]CRU CD5-98(PTD 219-059); C135-981-1(PTD219-060) Pressures Attachments: 2. CD5-98 10-401.xls; 2. C135-981-1 10-401.xis Follow Up Flag: Follow up Flag Status: Flagged Hello Victoria, Sorry about that. After discussing with our Reservoir Engineer, the latest max predictions for formation pressure are 3,700 psi. I have Updated the 10-401 applications and copied the calcs below. Please let me know if there is anything else I can do to help. Sincerely, Andy CDS-98 Casing Size (in) Csg Setting Depth MD/TVD(ft) Fracture Gradient(pp) Pore pressure (psi) ASP Drilling (psi) 20 120/120 10.9 51 56 10.75 2,296/2,189 14.5 964 1,432 7.625 14,250/7,514 12.5 3,700 3,167 4.5 31,844/ 7,749 12.5 3,700 n/a 1. ASP CALCULATIONS Drilling below 20" conductor ASP = [(FG x 0.052) - 0.1 ] D _ [(10.9 x 0.052) - 0.1 ] x 120 = 56 psi OR ASP = FPP - (0.1 x D) = 977 - (0.1 x 2190') = 745 psi 2. Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.1] D = [(14.5 x 0.052) - 0.1] x 2189' = 1432 psi OR ASP = FPP - (0.1 x D) = 3700 - (0.1 x 7514') = 2949 psi Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1 ] D _ [(12.5 x 0.052) - 0.1] x 7514 = 4132 psi OR ASP = FPP - (0.1 x D) -- 3700- (0.1 x 7749') = 2925 psi CDS -98 Ll Casing Size (in) Csg Setting Depth MD/TVD(ft) Fracture Gradient (ppg) Pore pressure (psi) ASP Drilling (psi) 20 120/120 10.9 51 56 10.75 2,296 / 2,189 14.5 964 1,432 7.625 14,250/7,514 12.5 3,700 3,167 4.5 30,708/ 7,594 12.5 3,700 n/a 2. ASP CALCULATIONS 4. Drilling below 20" conductor ASP = [(FG x 0.052) — 0.11 D =[(10.9x0.052)-0.1]x120=56psi OR ASP = FPP — (0.1 x D) = 977 — (0.1 x 2190') = 745 psi Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) — 0.1 ] D _ [(14.5 x 0.052) — 0.1] x 2189' = 1432 psi OR ASP = FPP — (0.1 x D) = 3700 — (0.1 x 7514') = 2949 psi 6. Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) — 0.11 D _ [(12.5 x 0.052) — 0.1 ] x 7514 = 4132 psi OR ASP = FPP — (0.1 x D) = 3700— (0.1 x 7594') = 2940 psi From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Sent: Tuesday, April 30, 2019 10:32 AM To: Marushack, Andy 1 <Andy.J.Marushack@conocophillips.com> Subject: [EXTERNAL]CRU CD5-98(PTD 219-059); CD5-98L1(PTD 219-060) Pressures Andy, The pore pressures and MPSP on the 10-401 form versus the ASP calculations are inconsistence. Please review and send me revised pressures or calculations. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil & Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 Applicatiol Permit to Drill, Well CRU CD5-981-1 Saved: 11 -Apr -19 4. Drilling Hazards Information (Requirements of20AAC25.005 (c)(4)) The following presents data used for calculation of anticipated surface pressure (ASP) during drilling of this well: Casing Size in Csg Setting Depth MD D ft Fracture Gradient(psi) Pore pressure ASP Drilling (psi) 20 1 120/120 10.9 51 56 10.75 2,296 / 2,189 14.5 964 1,4 7.625 14,250 / 7,514 12.5 3,950 3/f67 4.5 30,708/ 7,594 12.5 3,950 /n/a ASP is determined as the lesser of 1) surface pressure at breakdown of the formatioX casing seat with a gas gradient to the surface, or 2) formation pore pressure at the next casing point less; gas gradient to the surface as follows: 1) ASP= [(FG x 0.052) - 0.1]*D Where: ASP = Anticipated Surface pressure in psi FG = Fracture gradient at the casing seat in Ib/gal 0.052 = Conversion from lb./gal to psi/ft 0.1 = Gas gradient in psi/ft D = true Vertical depth of casing seat in ft RKB OR 2) ASP=FPP-(0.1xD) Where: FPP = Formation Pore Pressure at the next FPP = 0.4525 x TVD 1. ASP CALCULATIONS 1. Drilling below 20" conductor ASP - [(FG x 0.052) - 0.1 D = [(10.9 x 0.052 - 0.1] x 120 = 56 psi OR ASP = FPP - (0.1 x = 977 - (0 x 2190') = 745 psi 2. Drilling below 10-3/4" s face casing ASP - [(FG x1 52) - O.I J D _ [(t .5 x 0.052) - 0.1] x 2189' = 1432 psi OR ASP = FPP (0.1 x D) - 3950 - (0.1 x 7514') = 3199 psi 3. Drilling below 7- /8" intermediate casing ASP= FG x 0.052) - 0.1] D = [(12.5 x 0.052) - 0.1 ] x 7514 = 4132 psi OR AS = FPP - (0.1 x D) = 3950- (0.1 x 7594') = 3190 psi 0 015 CD5-981-1 APD Page 4 of 15 Printed.. 11 -Apr -19 Application' Permit to Drill, Well CRU CD5-98L1 Saved: 11 -Apr -19 (B) data on potential gas zones; The well bore is not expected to penetrate any gas zones. (C) data concerning potential causes of hole problems such as abnormally geo pressured strata, lost circulation zones, and zones that have a propensity for differential sticking; Please see Attachment 2 - Drilling Hazards Summary 5. Procedure for Conducting Formation Integrity Tests (Requirements of20AAC 25.005 (c)(5)) Drill out surface casing shoe and perform LOT test or FIT in accordance with the Alpine LOT / FIT procedure that ConocoPhillips Alaska has on file with the Commission. G. Casing and Cementing Program (Requirements of 20 AAC 25.005(c)(6)) Casin and Cementing Program Detailed in CD5-98 PTD CsglTbg Hole Size Weight Grade Conn. Length Top MD/TVD Btm MD/TVD Cement Program OD (in) (Ib/ft) (n) (II) (h) 20 42 94 H-40 Welded 80 41/41 120/120 10 yards Cement to Surface with 10.75 13.5 45.5 L-80 2,255 41/41 2,296 / 2,189 991 sx DeepCrete Lead 11.0 ppg, H563 271 sx Class G Tail Slurry 15.8 H563 / 7.625 9.875 29.7/39 L-80 UP 14,209 41/41 14,250 / 7,514 491 sx of Class G at 15.8 ppg x11 4.5 6.5 12.2 L-80 Blue 16,908 13,800 / 7,449 30,708/7,594 No cement, Perforation Sub 7. Diverter System Information (Requirements of20AAC25.005(c)(7)) It is requested that a waiver of the diverter requirement under 20 AAC 25.035 (h) (2) is granted. At CD5, more than twenty-four penetrations have been completed and there has not been a significant indication of shallow gas or gas hydrates above the C30 where casing will be set. CD5-9811 APD Page 5 of 15 Printed., 11 -Apr -19 Applicatio. Permit to Drill, Well CRU CD5-981_1 Saved: ll -Apr -19 8. Drilling Fluid Program (Requirements of20AAC25.005(c)(8)) Production Hole: J The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 — 9.5 ppg with calcium carbonate and KCl and utilize MPD for adding backpressure during connections. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-98L1 APD Page 6 of 15 Printed: 11 -Apr -19 Surface Intermediate Production Hole Size in. 13.5 9.875 x 11 6.5 Casing Size in. 10.75 7.625 4.5 Density PPG 9.0 — 10.0 9.6 —10.8 8.8-9.5 1 PV CP 30-80 10 10 YP Ib./100 ftz 100-200 20-28 10-15 Funnel Viscosity s/qt. 300 50-60 40-50 Initial Gels Ib./100 ft' 50 10 6 30 Minute Gels Ib./100 ftz 60 15 8 API Fluid Loss cc/30 min. N.C. —15.0 5.0 4.0 HPHT Fluid Loss cc/30 min. n/a 8.0-12.0 10.0 PH 11.0 9.5-10.0 9.0-9 .5 Production Hole: J The horizontal production interval will be drilled with a water-based mud drill -in fluid (FloPro) weighted to 9.0 — 9.5 ppg with calcium carbonate and KCl and utilize MPD for adding backpressure during connections. Diagram of Doyon 25 Mud System on file. Drilling fluid practices will be in accordance with appropriate regulations stated in 20 AAC 25.033. CD5-98L1 APD Page 6 of 15 Printed: 11 -Apr -19 Application Permit to Drill, Well CRU CD5-980 Saved: 11 -Apr -19 9. Abnormally Pressured Formation Information(Requirementsof20AAC25.005(c)(9)) N/A - Application is not for an exploratory or stratigraphic test well. 10. Seismic Analysis (Requirements of 20 AAC 25.005 (c)(10)) N/A - Application is not for an exploratory or stratigraphic test well. 11. Seabed Condition Analysis (Requirements of20 AAC 25.005 (c)(11) N/A - Application is not for an offshore well. 12. Evidence of Bonding (Requirements of20AAC25.005 (c)(12)) Evidence of bonding for ConocoPhillips Alaska, Inc. is on file with the Commission. 13. Proposed Drilling Program(Requirements of20 AAC 25.005 (c)(13)) The proposed drilling program is listed below. Please refer to Attachment 3: Completion Schematic. 1. End PTD for CD5-98 and begin PTD for CD5-98L1. 2. Pick up and run in hole with 6-1/2" drilling BHA. 3. Drill 6-1/2" hole to section TD (LWD Program: GR/RES) 4. Pull out of hole with drilling BHA. 5. Run 4.5" perforated pup liner, plop and drop in Alpine C lateral. 6. Run in hole whipstock retrieval BHA and retrieve whipstock. 7. RIH with 4.5" tubing with Baker Premier production packer. a. NOTE: A waiver is requested to set the production packer approximately 1000' MD above the intermediate casing shoe as per 20 AAC 25.412(b). This is to set the packer above the C sand window and maintain slickline accessibility to secure the well in the future. 8. Space out and land hanger. 9. Pressure test hanger seals to 5000 psi. 10. Drop ball and rod to set production packer, test tubing to 4,200 psi, chart test. 11. Bleed tubing pressure to 2,200 psi and test IA to 3,850 psi, chart test. 12. Install HP-BPV and test to 2,500 psi. 13. Nipple down BOP. 14. Install tubing head adapter assembly. N/U tree and test tree to 5000 psi/10 minutes. 15. Freeze protection tubing and annulus. 16. Secure well. RDMO. CD5-98L1 APD Page 7 of 15 Printed: 11 -Apr -19 Application Permit to Drill, Well CRU CD5-981_1 Saved: 11 -Apr -19 14. Discussion of Mud and Cuttings Disposal and Annular Disposal (Requirements of 20 AAC 25.005 (c)(14)) Incidental fluids developed from drilling operations on well CD5-98 will be injected into a permitted surface casing x production casing annulus on CD5. The C135-98 surface/intermediate casing annulus will be flushed with 300 bbls of fresh water prior to freeze protecting with diesel to 2000' TVD. Significant hydrocarbon zones include only the Alpine and Kuparuk sand based on pre -drill interpretations. There will be 500' of cement placed above the top of the Kuparuk reservoir. Once CD5-98 and CD5-98L1 have been drilled and completed, consideration may be given to permit this well for annular injection. An application for Sundry Operations form 10-403 will then be filed. Annular pumping of fluids occurring due to drilling operations, per regulation 20 AAC 25.080 could then begin once properly permitted. As stated above, any zones containing significant hydrocarbons will be isolated prior to initiating annular pumping. There will be no USDW's open below the shoe or potable/industrial water wells within one mile of the receiving zone. Reference the enclosed directional drilling plan for other formation markers in this well. Surface casing will be set near the base of the Schrader Bluff Formation (C-40). These 450-500' thick shales are part of the Colville Group and are known to provide vertical barriers to fluid flow in other areas. The maximum volume of fluids to be pumped down the annulus of this well will not exceed 35,000 bbl without the specific permission of the AOGCC. Fluid densities will range from diesel to a maximum of 12.0 ppg for drilling fluid wastes. Using 12.0 ppg fluid and the rig's specified maximum pumping pressure of 1,500 psi for annular injection, the maximum pressure at the surface casing shoe is estimated by: Max Shoe Pressure = (12.0 ppg) * (0.052) * (Surf. Shoe TVD) + 1,500 psi _ (12.0 ppg) * (0.052) * (2,189') + 1,500 psi = 2,866 psi Pore Pressure = 1,049 psi Therefore Differential = 2,866 — 1,049 = 1,817 psi. The internal casing pressure is conservative, since frictional losses while pumping have not been taken into consideration. The surface and intermediate casing strings exposed to the annular pumping operations have sufficient strength by using the 85% collapse and burst ratings listed in the following table: OD Wt (ppf) Grade Range Connection Type Collapse 86% Of Collapse Burst 85% of Burst 10-3/4" 45.5 L-80 3 HYD563/BTCM 2470 psi 2100 psi 5210 psi 4429 psi 7-5/8" 29.7 L-80 3 HYD563/BTCM 4790 psi 4071 psi 6890 psi 5856 psi 15. Attachments Attachment I Cement Summary Attachment 2 Drilling Hazards Summary Attachment 3 Completion Schematic Attachment 4 Directional Plan CD5-98L1 APD Page 8 of 15 Printed: 11 -Apr -19 Application ..,r Permit to Drill, Well CRU CD5-98L1 Saved: 11 -Apr -19 Attachment 1 — Cement Summary CD5-98L1 Cementing Program: CD5-98 Cement Schematic (wp. 5) 20" 94# H-40 Welded Conductor to 120' .............................. 10-314" 45.5# L-80 HYD563/TXP 2,296' MD 12,189' TVD @ 39° inc. ......................... ................... 9-718" x 11" Hole Top of Cement 13,070- MID /7,049'. TVD Kuparuk C 13,482' MD / 7,299' TVD KOP in Alpine C Alpine 13,820'. MID /7,449',TVD ...... 13,749' MD / 7,412' TVD -� ` 7-518" 29.7 L-80 HYD6631TXP 8, 394 Alpine A TXP Casing 14,078' MD / 7,496' TVD ��. `� 14,250' MD / 7,514' TVD @ 87° ` r CD5-98 A Sand 6-112" Hole i CD5-981-1 C Sand 6-112" Hole 31,844' MD/ 7,749@89° 30,708' MD/ 7,594@89° CD5-98L 1 APD Page 9 of 15 Printed 11 -Apr -19 I Application ..r Permit to Drill, Well CRU CD5-98L1 Saved: 11 -Apr -19 10.75" Surface Casing run to 2,296' MD / 2,189' TVD Cement from 2296' MD to 17961(500' of tail) with Class G + Adds. @ 15.8 PPG, and from 1796to surface with 11.0 ppg DeepCrete. Assume 250% excess annular volume in permafrost and 50% excess below the permafrost (1325' MD), zero excess in 20" conductor. Lead slurry from 1,796' MD to surface with Arctic Lite Crete @ 11.0 ppg Conductor (120'— 41) X 1.3645 ft3/ft X 1.0 (0% excess) = 108 ft' Permafrost to Conductor (1,325'— 120 X 0.3637 ft3/ft X 3.5 (250% excess) = 1,547 ft' Top of Tail to Permafrost (1,796'— 1,3251 X 0.3637 ft3/ftX 1.5 (50% excess) =257W Total Volume= 108 + 1,547 + 257 = 1,912 ft3 => 991 sx of 11.0 ppg DeepCrete @ 1.93 ft3 /sk Tail slurry from 2,296' MD to 1,796' MD with 15.8 ppg Class G + additives Shoe to Top of Tail (2,296' —1,796) X 0.3637 ft3/ft X 1.50 (50% excess) = 273 ft3 Shoe Joint (80) X 0.5400 ft3/ft X 1.0 (0% excess) = 43 ft' Total Volume = 273 + 43 = 316 ft3 => 271 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.17 ft3/sk 7.625" Intermediate Casine run to 14,250' MD / 7,514' TVD Top of slurry is designed to be at 13,070' MD, which is 250' TVD above the prognosis shallowest hydrocarbon bearing zone Kuparuk C. Assume 40% excess annular volume. *I I" Under reamer is 90' above the 9-7/8" bit. Tail slurry from 14,250' MD to 13,070' MD with 15.8 ppg Class G + additives Shoe to top of 9-7/8" Hole (14,250'— 14,160) X 0.2148 ft3/ftX 1.40 (40% excess) = 27 ft3 11" Hole to to Top of Cement (14,160'— 13,0701 X 0.3428 ft3/ft X 1.40 (40% excess) = 522 ft3 Shoe Joint (801 X 0.2578 ft'/ft X 1.0 (0% excess) = 21 ft3 Total Volume = 27+ 522 + 21 = 570 ft3 => 491 sx of 15.8 ppg Class G + 0.2% D046 antifoamer, 0.3% D065 dispersant and 0.8% 5002 accelerator @ 1.16 ft3/sk CD5-98L1 APD Page 10 of 15 Printed: 11 -Apr -19 Application. ,r Permit to Drill, Well CRU CD5-9811 Saved: 11 -Apr -19 Attachment 2 — Drilling Hazards Summary (To be posted in Rig Floor Doghouse Prior to Spud) 13-1/2" Hole / 10-3/4" Casing Interval Event Risk Level Mitigation Strategy Conductor Broach Low Monitor cellar continuously during interval. Well Collision Low Gro single shots, traveling cylinder diagrams Abnormal Reservoir Pressure Low Monitor well at base of permafrost, increased mud weight, decreased Gas Hydrates Low mud viscosity, increased circulating times, controlled drilling rates, Abnormal Reservoir Pressure Low low mud temperatures Running Sands and Gravel Low Maintain planned mud parameters, Increase mud weight, use Hydrogen Sulfide gas Low weighted sweeps. Lost Circulation Low Reduced pump rates, mud rheology, lost circulation material, use of low density cement slurries 9-7/8" x 11" Hole / 7-5/8" Casing Interval Event Risk Level Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent Lost circulation Low circulating density (ECD) monitoring, mud rheology, lost circulation Abnormal Reservoir Pressure Low material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. No mapped faults occur across the path of the planned wellbore. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers 6-1/2" Open Hole Production Interval (C Sand) Event Risk Level Mitigation Strategy Lost circulation Low Reduced pump rates, reduced trip speeds, real time equivalent circulating density (ECD) monitoring, mud rheology, lost circulation material Hole swabbing on tris Low Annular pressure applied by managed pressure drilling equipment. Abnormal Reservoir Pressure Low Well control drills, increased mud weight. Hydrogen Sulfide gas Low H2S drills, detection systems, alarms, standard well control practices, mud scavengers CD5-98L1 APD Page 11 of 15 Printed., 11 -Apr -19 Application .,,. Permit to Drill, Well CRU CD5-981-1 Saved: 11 -Apr -19 Well Proximitv Risks: Directional drilling / collision avoidance information as required by 20 ACC 25.050 (b) is provided in the following attachments. Drilling Area Risks: Reservoir Pressure: Offset production has the potential to reduce the reservoir pressure. LCM material will be on location to deal with losses. Weak sand stringers could be present in the overburden. LCM material will be available to seal in losses in the intermediate section. Lower Shale Stability: HRZ/Kalubik/Miluveach and instability in the intermediate interval will require higher mud weights and managed pressure drilling in order to stabilize the formations. Standard LCM material and well bore strengthening pills are expected to be effective in dealing with lost circulation if needed. CD5-98L1 APD Page 12 of 15 Printed: 11 -Apr -19 Applicatior, . -, Permit to Drill, Well CRU CD5-9811 Saved: 11 -Apr -19 Attachment 3 — Completion Schematic CD5 - 98 Alpine A/C Dual Lateral Producer Proposed Schematic TNT Production Pa at 13,720' MD HP Skiing sleeve for Selectivity 13,800' MD C sand Lateral 4-%"x 1" GLM 6 1/2" Hole TD 13,820'- 30,708' MD 4-%" 12.6# L-00 Hyd563 Liner w/ pert pups 0 0 0 0 0 0 0 0 ------------------------------. ---- 4-%x" 12.6# L-80 M 3-1/2" 9.3# TNNOSS TNT Production Packer A sand Lateral at 6 12" Hole TD 14,000' MD ZXP liner top packer 141205' — 31,844' MD at 14,055' MD Liner w/ frac ports I® --------------- 3-1/2" .-...___.._ CD5-98L1 APD Page 13 of 15 Printed: 11 -Apr -19 20" 94# H-40 Welded Upper Completion: Conductor to 115' MD 1) 4 %"-12.69 Hyd563 tubing 2) Shallow nipple profile 3.813" ID 3) 4-11W x 1" Camco KBMG GLM (xx°) w/DCK2 I pinned for 2500 psi casing to tbg shear 4) SLB DHG 12 5)TNT Packer I 6) X Nipple profile, 2.813" 7) TNT Packer I : 10-3/4" 45.5# L410 HYD 563 x 8)X Nipple profile, 2.813" BTC Lower Completion: Surface Casing at 2,296' MD 8) Plop and drop liner in C sand - no junction -4.5" 12.6# L-80 w/ pert pups I 9) ZXP liner top packer 8 Flexlock Liner Hanger 4-%" x 1" GLM 9 I XO 5" Hyddl 521 Box X 4-111V H563 pin I I I -4.5" Hydril563 12.6# L-80 w/ Frac Ports I I I I I I 4-112" 126# L•80 Hyd563 I I I I 4-1/:" x 1" GLM I I 7 5/8" 29.7# L-80 TXP I Intermediate Casing at 14,205' MD TNT Production Pa at 13,720' MD HP Skiing sleeve for Selectivity 13,800' MD C sand Lateral 4-%"x 1" GLM 6 1/2" Hole TD 13,820'- 30,708' MD 4-%" 12.6# L-00 Hyd563 Liner w/ pert pups 0 0 0 0 0 0 0 0 ------------------------------. ---- 4-%x" 12.6# L-80 M 3-1/2" 9.3# TNNOSS TNT Production Packer A sand Lateral at 6 12" Hole TD 14,000' MD ZXP liner top packer 141205' — 31,844' MD at 14,055' MD Liner w/ frac ports I® --------------- 3-1/2" .-...___.._ CD5-98L1 APD Page 13 of 15 Printed: 11 -Apr -19 d z to s March O6 2019 CD5-98L1 wp04.1 K assured [ecth 75/8 x 11 Flan 125 C< 74 70usft (1251 41- 1 0 9� T' N ^ m o iN o N N 1/o x601/.I o A 33� o 0 0 0 0 0 0 0 0 0 N N 900 DDI 7.615 plan Summ 0 �t---- CS -97 (ItE-P1 xg04. a 0 1380 Sec MD Inc Ad 12000 15000 18000 21000 24000 27000 33G 30 CYC -CI E 13224 - 14444 113820.00 73.49 14RW 7449.48 5251.39 -524287 0.00 1400 - I'ts0 horizontal [ocadure 213812.8] 75.34 139.11 g 5242.01 14190 - 14318 Had far W' 2290.0013820.00 CC599111E-A vw4.1 KV[+IFF-PX-CP7 EC TQC KC Pane 143]0 - 14558 Slxd 4.W11WME, 543' TF, W 51548' 138220.0014350.00 CIE: LI xu04 IPC.TFEKC 7449,6913821... 7 `E78 x 11 543 -5957,00 Hold fa 16.11' 514394.39100.39 14146 14350.0015750.00 CCS-98LI vn04 K V C 7594.70 3C7CPFG 4-1]2 6-1]2 h 4)IOCITLS, 135' TF, br 31273 Sb.W K EC C A 2018 01 14350 00 30708,50 C[5-9811 04 KV CdFF-PX-CP3-E( 14550 14140 Had ha 16%01W R aonetic odel 8late: -Jul -19 7%1.70 -959752 27189 CA OW 9974.57 CDS%L12Toe1224eJ1-1 TD: 307085'K9,]594.TM 300 60 14]40 - 14920 14920 15100 15100 15758 15]50 1£408 16400 17050 17850 17]00 te35g 18350 19000 190o 19fi50 19650 - 20300 Ins. 21600 2100 - 22900 14000 14175 14350 14525 14700 14875 15050 240 120 zzsoo - 24200 24£00 - 25500 K assured [eoth 25WO -'26710 £urlace Location 26610 46110 Ceolh F. Cwh To E Ivev7FWn Tool hacked by cceoted by 210 Sec MD Inc Ad 150 2811➢ -- 29410 40.80 190.0 ..508111E-11 x c04.1 CYC -CI E Macaroni J. Fvan 113820.00 73.49 14RW 7449.48 5251.39 -524287 0.00 29410 - 30709 1900.00 2293.0 CC& as II1FP1 xc04.1 6V CH4-PX-CP2E( 213812.8] 75.34 139.11 ]452.92 5242.01 180 648(145 Had far W' 2290.0013820.00 CC599111E-A vw4.1 KV[+IFF-PX-CP7 EC TQC KC Pane -525587 0.00 OW -645418 Slxd 4.W11WME, 543' TF, W 51548' 138220.0014350.00 CIE: LI xu04 IPC.TFEKC 7449,6913821... 7 `E78 x 11 543 -5957,00 Hold fa 16.11' 514394.39100.39 14146 14350.0015750.00 CCS-98LI vn04 K V C 7594.70 3C7CPFG 4-1]2 6-1]2 h 4)IOCITLS, 135' TF, br 31273 Sb.W K EC C A 2018 01 14350 00 30708,50 C[5-9811 04 KV CdFF-PX-CP3-E( 474974 4.88 x Had ha 16%01W R aonetic odel 8late: -Jul -19 Ev sanino this I acknov leads that I have been Infom ad of all disks. checked that the data is correct. ensured It can cleteness. and 87 surrounding v are are assigned to the cromr eesition. and 1 amrove the scan and collision avoidance clan as set out in Me audit nark.! Warove It as Me basis for the final v ell clan and v ellsits dray inns. I also ackncv ledge Nat unless notified olhery ise all targets have a 100 feet lateral tolerance. reeared by hacked by cceoted by K aonetic h Orth is 16.071 East of True Korth (K aonetic [eclination) K aonetic [ic 8 Field Etrenath: 80.72° 57373nT Sec MD Inc Ad m AWS AFP -W Dle9 TFaw VSea Tarot Macaroni J. Fvan 113820.00 73.49 14RW 7449.48 5251.39 -524287 0.00 O.W 649165 KOP: 15.9'fi00ME, -26°TF, br 128' Lllholcov Colunn 213812.8] 75.34 139.11 ]452.92 5242.01 -52]4.8] 15.902500 648(145 Had far W' 313862.W 75.M 139.11 ]40.52 522106 -525587 0.00 OW -645418 Slxd 4.W11WME, 543' TF, W 51548' 414378.28 100.39 14146 7479.55 4828.95 4929,12 4.00 543 -5957,00 Hold fa 16.11' 514394.39100.39 14146 ]476.65 014.55 491954 0.00 (100-54!238 h 4)IOCITLS, 135' TF, br 31273 Sb.W 814]0].12 8948 152.18 ]449.70 4554.43 474974 4.88 1350056!585 CD5981-11. HadIn418 JH Had ha 16%01W 730708.50 8948 152.18 7%1.70 -959752 27189 CA OW 9974.57 CDS%L12Toe1224eJ1-1 TD: 307085'K9,]594.TM Ev sanino this I acknov leads that I have been Infom ad of all disks. checked that the data is correct. ensured It can cleteness. and 87 surrounding v are are assigned to the cromr eesition. and 1 amrove the scan and collision avoidance clan as set out in Me audit nark.! Warove It as Me basis for the final v ell clan and v ellsits dray inns. I also ackncv ledge Nat unless notified olhery ise all targets have a 100 feet lateral tolerance. reeared by hacked by cceoted by Peeroved bv: S. CeLacc J. Fvan P. Conat CD5-98L1 wp04.1 I II, 20 _ 0 I I ,000 ,0-3/4 x 13-1/2 )ICO I i L 2500 u e U O 0 O J r O D° O Ol O O O o N u 5000 bO 0 O 4-1/2 x s-1 /2 r $�o I 0 7-5/8 x 11 i ' ^ '��� O �O 7500 7-5/8 x 9-7/8 6v 11 4-1/2 x 6-1 /2 1CC00 -7500 -5000 -2500 0 2500 5000 7500 10000 bertical Eecticn at 164.20' s CD5-98L1 w 04.1 While drilling production section, stay within 100 feet laterally of plan, unless notified otherwise. 0 7-5/8 x 11- 1 7 -5/8 7-5/8 x 9-7/8 6v 11 4�0 3000 p00 _._._.__'.. __� _._.10 3/4 , 11 4p x 13-1/2 O 1000 b000 ',,. 0 000 I ^� 19 0 20 0 I 2g 93000--- vi 2y000 '!. �'I 260p0 -6000 ,N�1 2a000 1 SpA 0 90 goo - 2 o1/2 a, =0 � g O' O 4 -9000 t�� .P\—.. ,- -.._� _ 4 -1/2x6 -l/2--- 90& x 6 1/2 ----- - I - -12000 -9000. -6000 -3000 0 3000 6000 9000 V est(-)/East(41 ConocoPhillips Alaska Inc_WNS Western North Slope CD5 Alpine West Pad Plan: CD5-98 (11 B) - Slot 98 50103xxxxx00 CD5-981-1 Plan: CD5-981-1 wp04 Standard Proposal Report 11 April, 2019 ConocoPhillips ConocoPhillips Database: OAKEDMPI Company: ConocoPhillips Alaska lnc_WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-98 (11B) Wellbore: CD5-9BL1 Design: CD5-981_1 wp04 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: C05-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (D25) Plan D25 @ 74.70usft (D25) True Minimum Curvature Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: Using Well Reference Point Map Zone: Using geodetic scale factor sfte CD5 Alpine West Pad Site Position: Northing: Latitude; From: Map Easting: Longitude: Position Uncertainty: 0 00 usft Slot Radius: 13.200 in Gdtl Convergence: Plan survey Tool Program Date 4/11/2019 Depth From Depth To (usft) (usft) Survey (Wellbore) 1 13,820.00 14,350.00 CD5-98L1 wp04 (C135-981-1) 2 14,350.00 15,850.00 CD5-981_1 wp04 (CD5-98L1) 3 14,350.00 30,708.50 CD5-981_1 wp04 (CD5-981.1) Latitude: Longitude: 0.00 usft Ground Level: Dip Angle 16.07 80.72 -1.15 ° 33.90 usft Field Strength (n T) 57,373 Tie On Depth: 13,820.00 +E/ -W Direction Well Plan: CD5-98 (11 B) - Slot 98 Well Position +N/ -S Northing: J +E/ -W Easting: Position Uncertainty 0.00 usft Wellhead Elevation: Wellbore CD5-98L1 Magnetics Model Name Sample Dale Declination BGGM2018 7/1/2019 Design CD5-98L1 wp04 - — _— Audit Notes: Version: Phase: PLAN Vertical Section: Depth From (TVD) +N/ -S (usft) (usft) 40.80 0.00 Plan survey Tool Program Date 4/11/2019 Depth From Depth To (usft) (usft) Survey (Wellbore) 1 13,820.00 14,350.00 CD5-98L1 wp04 (C135-981-1) 2 14,350.00 15,850.00 CD5-981_1 wp04 (CD5-98L1) 3 14,350.00 30,708.50 CD5-981_1 wp04 (CD5-981.1) Latitude: Longitude: 0.00 usft Ground Level: Dip Angle 16.07 80.72 -1.15 ° 33.90 usft Field Strength (n T) 57,373 Tie On Depth: 13,820.00 +E/ -W Direction (usft) 0.00 164.20 J Tool Name Remarks INC -TREND Inclinometer +known azi trend MWD MWD - Standard MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 411112019 9:11:41AM Page 2 COMPASS 5000.14 Build 85D ConocoPhillips Database: Company: Project: Site: Well: Wellbore: Design: Plan Sections Measured Depth (usft) 13,820.00 13,832.80 13,862.80 14,378.28 14,394.39 14,707.12 30,708.50 OAKEDMPI ConocoPhillips Alaska Inc_WNS Western North Slope CDS Alpine West Pad Plan: CD5-98 (11 B) CD5-98L1 CD5-98L1 wp04 Inclination Azimuth 73.49 140.00 75.34 139.11 75.34 139.11 100.39 141.46 100.39 141.46 89.48 152.18 89.48 152.18 Vertical Build Depth +N/ -S (usft) (usft) 7,449.48 5,251.39 7,452.92 5,242.01 7,460.52 5,220.06 7,479.56 4,826.95 7,476.65 4,814.55 7,449.70 4,554.43 7,594.70 -9,597.52 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: +EI -W (usft) -5,282.87 -5,274.87 -5,255.87 -4,929.42 -4,919.54 -4,749.74 2,716.55 ConocoPhillips Standard Proposal Report Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (D25) Plan D25 @ 74.70usft (025) True Minimum Curvature Dogleg Build Turn Rate Rate Rate (°1100usft) (°1100usft) (°1100usft) 0.00 a00 0.00 15.90 14.42 46.94 0.00 0.00 0.00 4.88 4.86 0.45 0.00 0.00 0.00 4.88 -3.49 3.43 0.00 0.00 0.00 TFO (°) Target 0.00 -25.00 0.00 5.43 0.00 135.00 CD5-981-1 T01 Heel 1 0.00 CD5-981-1 T02 Toe 1: 4/112019 9:11:41AM Page 3 COMPASS 5000.14 Build 85D ConocoPhillips ConocoPhillips Standard Proposal Report Database: OAKEDMPI Local Co-ordinate Reference: Well Plan: CDS-98(11 B) - Slot 98 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Plan D25 @ 74.70usft (D25) Project. Western North Slope MD Reference: Plan D25 Q 74.70usft (D25) Site: CD5 Alpine West Pad North Reference: True Well: Plan: CD5-98 (11 B) Survey Calculation Method: Minimum Curvature Wellbore: CD5-98L1 Design: CD5-98Li wp04 Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -NI-S -E/.W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100usft) (°1100usft) (°1100usft) 13,820.00 73.49 140.00 7,449.48 5,251.39 -5,282.87 5,491.85 0.00 0.00 0.00 KOP: 15.9°/100' DLS, -25° TF, for 12.8' 13,821.00 73.64 139.93 7,449.77 5,250.65 -5,282.25 £,490.78 15.90 14.41 -7.00 7-518 z 11 13,832.80 75.34 139.11 7,452.92 5,242.01 -5,274.87 5,480.45 15.90 14.43 -6.94 Hold for 30' 13,862.80 75.34 139.11 7,460.52 5,220.06 -5,255.87 5,454.16 0.00 0.00 0.00 Start 4.88°1100' DLS, 5.43° TF, for 515.48' 13,900.00 77.15 139.29 7,469.36 5,192.71 -5,232.26 -6,421.42 4.88 4.86 0.47 14,000.00 82.01 139.75 7,487.44 5,117.93 -5,168.43 .6,332.07 4.88 4.86 0.46 14,100.00 86.87 140.20 7,497.13 5,041.73 -5,104.45 .6,241.33 4.88 4.86 0.45 14,200.00 91.73 140.65 7,498.36 4,964.68 -5,040.76 -6,149.85 4.88 4.86 0.45 14,300.00 96.59 141.10 7,491.11 4,887.34 -4,977.84 -6,058.29 4.88 4.86 0.45 14,378.28 100.39 141.46 7,479.56 4,826.95 4,929.42 -5,987.00 4.88 4.86 0.46 Hold for 16.11' 14,394.39 100.39 141.46 7,476.65 4,814.55 4,919.54 -5,972.38 0.00 0.00 0.00 Start 4.88°1100' DLS, 135° TF, for 312.73' 14,400.00 100.20 141.65 7,475.65 4,810.23 4,916.11 .5,967.29 4.88 -3.45 3.51 14,500.00 96.73 145.12 7,460.93 4,730.85 -4,857.15 -5,874.85 4.88 -3.47 3.47 14,600.00 93.24 148.55 7,452.24 4,647.48 -4,802.67 -5,779.60 4.88 -3.49 3.42 14,700.00 89.73 151.94 7,449.65 4,560.72 -4,753.08 -5,682.81 4.88 -3.51 3.40 14,707.12 69.48 152.18 7,449.70 4,554.43 4,749.74 5,675.85 4.88 -3.51 3.39 Hold for 16001.38' 14,800.00 89.48 152.18 7,450.54 4,472.28 4,706.40 5,585.00 0.00 0.00 0.00 14,900.00 69.48 152.18 7,451.45 4,383.84 4,659.74 5,487.20 0.00 0.00 0.00 15,000.00 89.48 152.18 7,452.35 4,295.40 -4,613.08 -5,389.39 0.00 0.00 0.00 15,100.00 89.48 152.18 7,453.26 4,206.96 -4,566.42 -5,291.58 0.00 0.00 0.00 15,200.00 89.48 152.18 7,454.17 4,118.52 -4,519.76 -5,193.78 0.00 0.00 0.00 15,300.00 8948 152.18 7,455.07 4,030.07 -4,473.10 -5,095.97 0.00 0.00 0.00 15,400.00 89.48 152.18 7,455.98 3,941.63 -4,426.44 4,998.16 0.00 0.00 0.00 15,500.00 89.48 152.18 7,456.89 3,653.19 4,379.78 4,900.36 0.00 0.00 0.00 15,600.00 89.48 152.18 7,457.79 3,764.75 4,333.12 4,802.55 0.00 0.00 0.00 15,700.00 89.48 152.18 7,458.70 3,676.31 -4,286.46 4,704.74 0.00 0.00 0.00 15,800.00 89.48 152.18 7,459.60 3,587.86 4,239.80 4,606.94 0.00 0.00 0.00 15,900.00 89.48 152.18 7,460.51 3,499.42 4,193.14 4,509.13 0.00 0.00 0.00 16,000.00 89.48 152.18 7,461.42 3,410.98 4,146.48 4,411.32 0.00 0.00 0.00 16,100.00 89.48 152.18 7,462.32 3,322.54 4,099.82 -4,313.52 0.00 0.00 0.00 16,200.00 89.48 152.18 7,463.23 3,234.10 4,053.16 4,215.71 0.00 0.00 0.00 16,300.00 89.48 152.18 7,464.13 3,145.65 4,006.50 4,117.90 0.00 0.00 0.00 16,400.00 89.48 152.18 7,465.04 3,057.21 -3,959.84 4,020.10 0.00 0.00 0.00 16,500.00 89.48 152.18 7,465.95 2,968.77 -3,913.18 -3,922.29 0.00 0.00 0.00 16,600.00 89.48 152.18 7,466.85 2,880.33 -3,866.52 -3,824.48 0.00 0.00 0.00 16,700.00 89.48 152.18 7,467.76 2,791.89 -3,819.86 -3,726.68 0.00 0.00 0.00 16,800.00 89.48 152.18 7,468.67 2,703.44 -3,773.20 -3,628.87 0.00 0.00 0.00 16,900.00 89.48 152.18 7,469.57 2,615.00 -3,726.54 -3,531.06 0.00 0.00 0.00 17,000.00 89.48 152.18 7,470.48 2,526.56 -3,679.88 -3,433.26 0.00 0.00 0.00 17,100.00 89.48 152.18 7,471.38 2,438.12 -3,633.22 3,335.45 0.00 0.00 0.00 17,200.00 89.48 152.18 7,472.29 2,349.68 -3,586.56 -3,237.64 0.00 0.00 0.00 17,300.00 89.48 152.18 7,473.20 2,261.23 -3,539.90 -3,139.84 0.00 0.00 0.00 17,400.00 89.48 152.18 7,474.10 2,172.79 -3,493.24 -3,042.03 0.00 0.00 0.00 17,500.00 89.48 152.18 7,475.01 2,084.35 -3,446.57 -2,944.22 0.00 0.00 0.00 17,600.00 89.48 152.18 7,475.91 1,995.91 -3,399.91 -2,846.42 0.00 0.00 0.00 17700.00 89.48 152.18 7,476.82 1,91)7.46 -3,353.25 -2,748.61 0.00 0.00 0.00 411112019 9: 11:41AM Page 4 COMPASS 5000.14 Build 850 ConocoPhillips ConocoPhillips Standard Proposal Report Database: OAKEDMPI Local Co-ordinate Reference: Well Plan: CDS-98(11 B) - Slot 98 Company: ConocoPhillips Alaska Inc_WNS TVD Reference: Plan D25 @ 74.70usft (D25) Project: Western North Slope MD Reference: Plan D25 @ 74.70usft (D25) Site: CDS Alpine West Pad North Reference: True Well: Plan: CD5-98 (11 B) Survey Calculation Method: Minimum Curvature Wellbore: CD5-98L1 Azimuth Depth Design: CD5-9811 wp04 Section Rate Planned Survey Measured Vertical Vertical Dogleg Build Nm Depth Inclination Azimuth Depth +NIS +El -W Section Rate Rate Rate (usft) (°) (°) (usft) (usft) (usft) (usft) (°1100usR) (°1100usft) (°1100usft) 17,800.00 89.48 152.18 7477.73 1,819.02 -3,306.59 -2,650.80 0.00 0.00 0.00 17,900.00 89.48 152.18 7,478.63 1,730.58 -3,259.93 -2,553.00 0.00 0.00 0.00 18,000.00 89.48 152.18 7,479.54 1,642.14 -3,213.27 -2,455.19 0.00 0.00 0.00 18,100.00 89.48 152.18 7,480.45 1,553.70 -3,166.61 -2,357.38 0.00 0.00 0.00 18,200.00 89.48 152.18 7,481.35 1,465.25 3,119.95 -2,259.58 0.00 0.00 0.00 18,300.00 89.48 152.18 7,482.26 1,376.81 -3,073.29 -2,161.77 0.00 0.00 0.00 18,400.00 89.48 152.18 7,483.16 1,288.37 -3,026.63 -2,063.96 0.00 0.00 0.00 18,500.00 89.48 152.18 7,484.07 1,199.93 -2,979.97 -1,966.16 0.00 0.00 0.00 18,600.00 89.48 152.18 7,484.98 1,111.49 -2,933.31 -1,868.35 0.00 0.00 0.00 18,700.00 89.48 152.18 7,485.88 1,023.04 -2,886.65 -1,770.54 0.00 0.00 0.00 18,800.00 89.48 152.18 7,486.79 934.60 -2,839.99 -1,672.74 0.00 0.00 0.00 18,900.00 89.48 152.18 7,487.69 846.16 -2,793.33 -1,574.93 0.00 0.00 0.00 19,000.00 89.48 152.18 7,488.60 757.72 -2,746.67 -1,477.12 0.00 0.00 0.00 19,100.00 89.48 152.18 7,489.51 669.28 -2,700.01 -1,379.32 0.00 0.00 0.00 19,200.00 89.48 152.18 7,490.41 580.83 -2,653.35 -1,281.51 0.00 0.00 0.00 19,300.00 89.48 152.18 7,491.32 492.39 -2,606.69 -1,183.70 0.00 0.00 0.00 19,400.00 89.48 152.18 7,492.23 403.95 -2,560.03 -1,085.90 0.00 0.00 0.00 19,500.00 89.48 152.18 7,493.13 315.51 -2,513.37 -988.09 0.00 0.00 0.00 19,600.00 89.48 152.18 7,494.04 227.07 -2,466.71 390.28 0.00 0.00 0.00 19,700.00 89.48 152.18 7,494.94 138.62 -2,420.05 -792.48 0.00 0.00 0.00 19,800.00 89.48 152.18 7,495.85 50.18 -2,373.39 -694.67 0.00 0.00 0.00 19,900.00 89.48 152.18 7,496.76 38.26 -2,326.73 -596.86 0.00 0.00 0.00 20,000.00 89.48 152.18 7,497.66 -126.70 -2,280.07 -499.06 0.00 0.00 0.00 20,100.00 89.48 152.18 7,498.57 -215.14 -2,233.41 -401.25 0.00 0.00 0.00 20,200.00 89.48 152.18 7,499.48 -303.59 -2,186.75 -303.44 0.00 0.00 0.00 20,300.00 89.48 152.18 7,500.38 -392.03 -2,140.09 -205.64 0.00 0.00 0.00 20,400.00 89.48 152.18 7,501.29 480.47 -2,093.43 -107.83 0.00 0.00 0.00 20,500.00 89.48 152.18 7,502.19 -568.91 -2,046.77 -10.02 0.00 0.00 0.00 20,600.00 89.48 152.18 7,503.10 -657.35 -2,000.11 87.78 0.00 0.00 0.00 20,700.00 89.48 152.18 7,504.01 -745.80 -1,953.45 185.59 0.00 0.00 0.00 20,800.00 89.48 152.18 7,504.91 -834.24 -1,906.79 283.40 0.00 0.00 0.00 20,900.00 89.48 152.18 7,505.82 -922.68 -1,860.13 381.20 0.00 0.00 0.00 21,000.00 89.48 152.18 7,506.72 -1,011.12 -1,813.47 479.01 0.00 0.00 0.00 21,100.00 89.48 152.18 7,507.63 -1,099.57 -1,766.80 576.82 0.00 0.00 0.00 21,200.00 89.48 152.18 7,508.54 -1,188.01 -1,720.14 674.62 0.00 0.00 0.00 21,300.00 89.48 152.18 7,509.44 -1,276.45 -1,673.48 772.43 0.00 0.00 0.00 21,400.00 89.48 152.18 7,510.35 -1,364.89 -1,626.82 870.24 0.00 0.00 0.00 21,500.00 89.48 152.18 7,511.26 -1,453.33 -1,580.16 968.04 0.00 0.00 0.00 21,600.00 89.48 152.18 7,512.16 -1,541.78 -1,533.50 1,065.85 0.00 0.00 0.00 21,700.00 89.48 152.18 7,513.07 -1,630.22 -1,486.84 1,163.66 0.00 0.00 0.00 21,800.00 89.48 152.18 7,513.97 -1,718.66 -1,440.18 1,261.46 0.00 0.00 0.00 21,900.00 89.48 152.18 7,514.88 -1,807.10 -1,393.52 1,359.27 0.00 0.00 0.00 22,000.00 89.48 152.18 7,515.79 -1,895.54 -1,346.86 1,457.08 0.00 0.00 0.00 22,100.00 89.48 152.18 7,516.69 -1,983.99 -1,300.20 1,554.88 0.00 0.00 0.00 22,200.00 89.48 152.18 7,517.60 -2,072.43 -1,253.54 1,652.69 0.00 0.00 0.00 22,300.00 89.48 152.18 7,518.50 -2,160.87 -1,206.88 1,750.50 0.00 0.00 0.00 22,400.00 89.48 152.18 7,519.41 -2,249.31 -1,160.22 1,848.30 0.00 0.00 0.00 22,500.00 89.48 152.18 7,520.32 -2,337.75 -1,113.56 1,946.11 0.00 0.00 0.00 22,600.00 89.48 152.18 7,521.22 -2,426.20 -1,066.90 2,043.92 0.00 0.00 0.00 22,700.00 89.48 152.18 7,522.13 -2,514.64 -1,020.24 2,141.72 0.00 0.00 0.00 22,800.00 89.48 152.18 7,523.04 -2,603.08 -973.58 2,239.53 0.00 0.00 0.00 22,900.00 89.48 152.18 7,523.94 -2,691.52 -926.92 2,337.34 0.00 0.00 0.00 23,000.00 89.48 152.18 7,524.85 -2,779.96 -880.26 2,435.14 0.00 0.00 0.00 23,100.00 89.48 152.18 7,525.75 -2,868.41 -833.60 2,532.95 0.00 0.00 0.00 41112019 9:11:41AM Page 5 COMPASS 5000.14 Build 85D ConocoPhillips Database: OAKEDMPl Local Co-ordinate Reference: Company: ConocoPhillips Alaska Inc WNS TVD Reference: Project Western North Slope MD Reference: Site: CD5 Alpine West Pad North Reference: Well: Plan: CD5-98 (11 B) Survey Calculation Method: Wellbore: CD5-9811 Dogleg Design: CD5-9811 wp04 Depth ConocoPhillips Standard Proposal Report Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (1325) Plan D25 @ 74.70usft (D25) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth +N/.S +El -W Section Rate Rate Rate (usft) (^) (_) (usft) (usft) (usft) (usft) (°/100usR) ("NOOusft) (°1100usft) 23,200.00 8948 152.18 7,526.66 -2,956.85 -786.94 2,630.76 0.00 0.00 0.00 23,300.00 89.48 152.18 7,527.57 -3,045.29 -740.28 2,728.56 0.00 0.00 0.00 23,400.00 89.48 152.18 7,528.47 -3,133.73 -693.62 2,626.37 0.00 0.00 0.00 23,500.00 89.48 152.18 7,529.38 -3,222.17 -646.96 2,924.18 0.00 0.00 0.00 23,600.00 89.48 152.18 7,530.28 -3,310.62 -600.30 3,021.98 0.00 0.00 0.00 23,700.00 89.48 152.18 7,531.19 -3,399.06 -553.64 3,119.79 0.00 0.00 0.00 23,800.00 89.48 152.18 7,532.10 -3,487.50 -506.98 3,217.60 0.00 0.00 0.00 23,900.00 89.48 152.18 7,533.00 -3,575.94 460.32 3,315.40 0.00 0.00 0.00 24,000.00 89.48 152.18 7,533.91 -3,664.39 Al 166 3,413.21 0.00 0.00 0.00 24,100.00 89.48 152.18 7,534.62 -3,752.83 -367.00 3,511.02 0.00 0.00 0.00 24,200.00 89.48 152.18 7,535.72 -3,841.27 -320.34 3,608.82 0.00 0.00 0.00 24,300.00 89.48 152.18 7,536.63 -3,929.71 -273.68 3,706.63 0.00 0.00 0.00 24,400.00 89.48 152.18 7,537.53 4,018.15 -227.02 3,804.44 0.00 0.00 0.00 24,500.00 89.48 152.18 7,538.44 4,106.60 -180.36 3,902.24 0.00 0.00 0.00 24,600.00 89.48 152.18 7,539.35 4,195.04 -133.70 4,000.05 0.00 0.00 0.00 24,700.00 89.48 152.18 7,540.25 -0,283.48 -87.04 4,097.86 0.00 0.00 0.00 24,800.00 89.48 152.18 7,541.16 4,371.92 40.37 4,195.66 0.00 0.00 0.00 24,900.00 89.48 152.18 7,542.07 4,460.36 6.29 4,293.47 0.00 0.00 0.00 25,000.00 89.48 152.18 7,542.97 4,548.67 52.95 4,391.28 0.00 0.00 0.00 25,100.00 89.48 152.18 7,543.88 4,637.25 99.61 4,489.08 0.00 0.00 0.00 25,200.00 89.48 152.18 7,544.78 4,725.69 146.27 4,566.89 0.00 0.00 0.00 25,300.00 89.48 152.18 7,545.69 4,814.13 192.93 4,684.70 0.00 0.00 0.00 25,400.00 89.48 152.18 7,546.60 4,902.57 239.59 4,782.50 0.00 0.00 0.00 25,500.00 89.48 152.18 7,547.50 4,991.02 286.25 4,880.31 0.00 0.00 0.00 25,600.00 89.48 152.18 7,548.41 -5,079.46 332.91 4,978.12 0.00 0.00 0.00 25,700.00 89.48 152.18 7,549.31 -5,167.90 379.57 5,075.92 0.00 0.00 0.00 25,800.00 89.48 152.18 7,550.22 -5,256.34 426.23 5,173.73 0.00 0.00 0.00 25,900.00 89.48 152.18 7,551.13 -5,344.78 472.89 5,271.54 0.00 0.00 0.00 26,000.00 89.48 152.18 7,552.03 -5,433.23 519.55 5,369.34 0.00 0.00 0.00 26,100.00 89.48 152.18 7,552.94 5,521.67 566.21 5,467.15 0.00 0.00 0.00 26,200.00 89.48 152.18 7,553.85 -5,610.11 612.87 5,564.96 0.00 0.00 0.00 26,300.00 69.48 152.18 7,554.75 -5,698.55 659.53 5,662.76 0.00 0.00 0.00 26,400.00 89.48 152.18 7,555.66 -5,786.99 706.19 5,760.57 0.00 0.00 0.00 26,500.00 8948 152.18 7,556.56 -5,875.44 752.85 5,858.38 0.00 0.00 0.00 26,600.00 89.48 152.18 7,557.47 -5,963.88 799.51 5,956.18 0.00 0.00 0.00 26,700.00 89.48 152.18 7,558.38 -6,052.32 846.17 6,053.99 0.00 0.00 0.00 26,800.00 89.48 152.18 7,559.28 -6,140.76 892.83 6,151.80 0.00 0.00 0.00 26,900.00 89.48 152.18 7,560.19 -6,229.20 939.49 6,249.60 0.00 0.00 0.00 27,000.00 89.48 152.18 7,561.09 -6,317.65 986.15 6,347.41 0.00 0.00 0.00 27,100.00 89.48 152.18 7,562.00 5,406.09 1,032.81 6,445.22 0.00 0.00 0.00 27,200.00 89.48 152.18 7,562.91 -6,494.53 1,079.47 6,543.02 0.00 0.00 0.00 27,300.00 89.48 152.18 7,563.81 -6,582.97 1,126.13 6,640.83 0.00 0.00 0.00 27,400.00 89.48 152.18 7,564.72 -6,671.42 1,172.79 6,738.64 0.00 0.00 0.00 27,500.00 69.48 152.18 7,565.63 -6,759.86 1,219.45 6,836.44 0.00 0.00 0.00 27,600.00 89.48 152.18 7,566.53 -6,848.30 1,266.11 6,934.25 0.00 0.00 0.00 27,700.00 89.48 152.18 7,567.44 -6,936.74 1,312.77 7,032.06 0.00 0.00 0.00 27,800.00 89.48 152.18 7,568.34 -7,025.18 1,359.43 7,129.86 0.00 0.00 0.00 27,900.00 89.48 152.18 7,569.25 -7,113.63 1,406.09 7,227.67 0.00 0.00 0.00 28,000.00 89.48 152.18 7,570.16 -7,202.07 1,452.75 7,325.48 0.00 0.00 0.00 28,100.00 89.48 152.18 7,571.06 -7,290.51 1,499.41 7,423.28 0.00 0.00 0.00 28,200.00 89.48 152.18 7,571.97 -7,378.95 1,546.07 7,521.09 0.00 0.00 0.00 28,300.00 89.48 152.18 7,572.88 -7,467.39 1,592.73 7,618.90 0.00 0.00 0.00 28,400.00 89.48 152.18 7,573.78 -7,555.84 1,639.40 7,716.70 0.00 0.00 0.00 28,500.00 89.48 152.18 7,574.69 -7,644.28 1,686.06 7,814.51 0.00 0.00 0.00 4/11/2019 9:11:41AM Page 6 COMPASS 5000.14 Build 85D ConocoPhillips Database: CAKEDMPI Company: ConocoPhillips Alaska Inc WNS Project: Western North Slope Site: CD5 Alpine West Pad Well: Plan: CD5-98 (11B) Wellbore: CD5-98L1 Nat„n• CD5-981_1 wD04 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (D25) Plan D25 @ 74.70usft (D25) True Minimum Curvature Planned Survey Measured Vertical Vertical Dogleg Build Turn Depth Inclination Azimuth Depth -N/,S +E/ -W Section Rate Rate Rate (usft) C) C) (usft) (usft) (usft) (usft) (-/100usft) ("1100nsft) (°1100usft) 28,600.00 89.48 152.18 7,575.59 -7,732.72 1732.72 7,912.32 0.00 0.00 0.00 28,700.00 89.48 152.18 7,576.50 -7,821.16 1,779.38 8,010.12 0.00 0.00 0.00 28,800.00 89.48 152.18 7,577.41 -7,909.60 1,826.04 8,107.93 0.00 0.00 0.00 28,900.00 89.48 152.18 7,578.31 -7,998.05 1,872.70 8,205.74 0.00 0.00 0.00 29,000.00 89.48 152.18 7,579.22 -8,086.49 1,919.36 8,303.54 0.00 0.00 0.00 29,100.00 89.48 152.18 7,580.12 -8,174.93 1,966.02 8,401.35 0.00 0.00 0.00 29,200.00 89.48 152.18 7,581.03 -8,263.37 2,012.68 8,499.16 0.00 0.00 0.00 29,300.00 89.48 152.18 7,581.94 -8,351.81 2,059.34 8,596.96 0.00 0.00 0.00 29,400.00 89.48 152.18 7,582.84 -8,440.26 2,106.00 8,694.77 0.00 0.00 0.00 29,500.00 89.48 152.18 7,563.75 -8,528.70 2,152.66 8,792.58 0.00 0.00 0.00 29,600.00 89.48 152.18 7,584.66 -8,617.14 2,199.32 8,890.38 0.00 0.00 0.00 29,700.00 89.48 152.18 7,585.56 -8,705.58 2,245.98 8,988.19 0.00 0.00 0.00 29,800.00 69.48 152.16 7,586.47 -8,794.02 2,292.64 9,086.00 0.00 0.00 0.00 29,900.00 89.48 152.18 7,587.37 -8,882.47 2,339.30 9,183.80 0.00 0.00 0.00 30,000.00 89.46 152.18 7,588.28 -8,970.91 2,385.96 9,281.61 0.00 0.00 0.00 30,100.00 89.48 152.18 7,589.19 -9,059.35 2,432.62 9,379.42 0.00 0.00 0.00 30,200.00 89.48 152.18 7,590.09 -9,147.79 2,479.28 9,477.22 0.00 0.00 0.00 30,300.00 89.48 152.18 7,591.00 -9,236.23 2,525.94 9,575.03 0.00 0.00 0.00 30,400.00 89.48 152.18 7,591.90 -9,324.68 2,572.60 9,672.84 0.00 0.00 0.00 30,500.00 89.48 152.18 7,592.81 -9,413.12 2,619.26 9,770.64 0.00 0.00 0.00 30,600.00 89.48 152.18 7,593.72 -9,501.56 2,665.92 9,868.45 0.00 0.00 0.00 30,700.00 89.48 152.18 7,594.62 -9,590.00 2,712.56 9,966.26 0.00 0.00 0.00 30,708.50 89.48 152.18 7,594.70 -9,597.52 2,716.55 9,974.57 0.00 0.00 0.00 TD: 30708.5' MD, 7594.7' TVD Design Targets Target Name -hiVmiss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W Northing Easting -Shape V) V) (usft) (usft) (usft) (usft) (usft) Latitude Longitude CD5-98L1 TOt Heel 122 0.00 0.00 7,449.70 - plan hits target center -Circle (radius 100.00) CD5-981_1 T02 Toe 1221 0.00 0.00 7,594.70 - plan hits target center - Circle (radius 100.00) 4/11/2019 9:11:41AM Page 7 COMPASS 5000.14 Build 85D ConocoPhillips Database: OAKEDMPI Company: ConocoPhillips Alaska lnc_WNS Project: Western North Slope Site: CDs Alpine West Pad Well: Plan: CDS-98 (11 B) Wellbore: CD5-98L1 Design: CD5-98L1 wp04 Casing Points Measured Depth (usft) 159.80 2,296.67 13,821.00 30,708.50 Plan Annotations Measured Depth (usft) 13,820.00 13,832.80 13,862.80 14,378.28 14,394.39 14,707.12 30,708.50 Vertical Hole Depth Diameter (usft) (in) 159.80 20 2,189.70 10-3/4 x 13-1/2 7,449.69 7-5/8 x 11 7,594.70 4-1/2x6-1/2 Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: ConocoPhillips Standard Proposal Report Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (025) Plan D25 Q 74.70usft (D25) True Minimum Curvature Casing Hole Diameter Diameter Name (in) (in) 20.000 48.000 10.750 13.500 7.625 11.000 4.500 6.500 Vertical Local Coordinates Depth -N/-S +EI -W (usft) (usft) (usft) Comment 7,449.48 5,251.39 -5,282.87 KOP: 15.9'/100' DLS, -25° TF, for 12.8' 7,452.92 5,242.01 -5,274.87 Hold for 30' 7,460.52 5,220.06 -5,255.87 Start 4.88'/100' OILS, 5.43° TF, for 515.48' 7,479.56 4,826.95 4.929.42 Hold for 16.11' 7,476.65 4,814.55 -4,919.54 Start 4.88°/100' OILS, 135' TF, for 312.73' 7,449.70 4,554.43 -4,749.74 Hold for 16001.38' 7,594.70 -9,597.52 2,716.55 TD: 30708.5' MD, 7594.7' TVD 41112019 9.11:41AM Page 8 COMPASS 5000.14 Build 85D ConocoPhillips Alaska Inc_WNS Western North Slope CD5 Alpine West Pad Plan: CD5-98 (118) CD5-98LI 50103xxxxx00 CD5.981-1 wp04.1 ConocoPhillips Clearance Summary Anticollision Report 06 March, 2019 Tm. Cylinder NSurvey orth Proximity scan on Current Data (North Reremnce) Reterenca Deel9¢ CD5 Alpine.. Pad- Plan: CD5b0(11B)-CDS-901-1-CD5.90L1 salads Datum HelghL Plan D35@14.14uaR(D35) Scan Range: 1],.H.001.30.]0.... ue R. Measured Depth. Scan Radlue Is 3,3.6.]1 -ft. CW ance Factor cutoff is Unlimited. Max Ellipse Sepa...n is Unlimited Gial Scale Fahr P,Oh sl Vemon: 5000.14 Build: RISE) ScanT..i Sran TYP.: "® ConocoPhillips ConocoPhillips Anticollision Report for Plan: COS -98 (11B) - CD5-981.1 wp04.1 ColocoPhillips Alaska Inc _WNS Western North Slope V. C,11. a, North PmYmtty$.an cn Cement Survey Dila ploex Neremncel 2.8WA1 19.689.48 ReMenu Dpgn: red Alpine Weal Pad -flan: ODS46 N1B1-006-961.1-CD64BL1 np04 15,200,0 4,944 EIIIpss Sepandem Sean Nana: 13,820AD to 30.708.60 ask Meadunb DepM. 22.58223 2,95038 Scan Radius N 3.266." Usk. CWe.- Facb1 CumR. Uni i.d. Max CIUPae Sapan km Is Unlimlmd 2,332.92 29.103.00 Mpaund Mlnlmum @M¢aaunl Ellipse alseeund CNannw Sumnury lease, 0. an, Name DspM DNbnce DaP sepantien D.Mh Fxmr M.I.A. U ams n Wunlns Omparlson ANU Name-WeIIWn Name -Desip (sank IwN (.am hies usk COS Alpine West Pad CD5-20-CD5-20-CD9.20 CD5-W-co5-20-CDS2D CDS25-CD5-20L1-CD5-WL1 CD6 -CD5-20L1-CDS20L1 CDS22-CD5-22-CD5-22 CDS22-CD5-22-CD5-22 CDS22-CD5-21-CD5-22 CDS23-CD5-23-CD5.20 CD5­23-CDS-23-CDS23 CDS23-CD5-23-CDS23 CD5-25-CD5-25-CDS25 CD5.25-CD5-25-00S25 CDS25-CM-25LI CD5­25L1 CDS25-005-251-1-CD5-251-1 CDS25-CD5-251-1-CDS250 COS313-CD5313P81-CDS313PB1 005315- Coal -CD5415 CDS-315 - CM415 - CDS-31 CDB -31 5 - CD5d 15 - CD5.315 CDS315-CD5-315PB1-MS-315PB1 CD5315.CD5-315PB1-CD5-315PB1 CD5­315-CD5-315PB1-CD5315PB1 Plan: CD5-26 (l1C)-CDS26 -CD5-26 arp05 (11A) Nen: CD5-26 (11C)-CDS20L1-CD5-2611 wp3 Nan: CD5-9 (12C) -CD5-27-CD5-27wp02 W (12C) Nan: CDS27 (12C). CDS27-CDS27wP0210 (12C) Nan: CD5-9(12C)-CD5-27-CD547a 2e3(12C) Plan: CDS28 (13C) -CDS25-CD -28 02 W (13C) 19,668.40 2.8WA1 19.689.48 2,299.44 15,200,0 4,944 EIIIpss Sepandem Pau - 22.58223 2,95038 2!,56233 2,332.92 29.103.00 4.779 Clesnn eFant Pass - 15.022.98 2,80720 15,022.98 2,323.99 10.300A0 5.120 C¢Mre Malano Pass - 0,990A1 2.913.88 0,998.41 2,301.08 22,523.57 4.755 Clearance Faces Pan - 18.167.89 2,611.02 18,157.89 ?042.35 8.800.00 4591 Came DMnm Pass - 16.091.86 2,813.02 18,001 Be 2,41.53 0.900.00 4.573 Planes SWamWn Paas - 16,01223 2,619.50 10,012.23 2,045.08 8.900.57 4.567 Ceaance F.W' Pass - 14,803.54 1,353.59 14,803.54 772.57 11,300.57 2.331 Caea Di n. Pass - M,720.00 1,355.35 14,720.03 "2.95 11.4W.W 2.327 E11W BapamWn Pass - 14.592.82 1,380.98 14,692,2 780.55 11,857.57 2.326 Cleannu Fazbr Pass 22,551.24 1,441.0 22.55124 557.95 7,9W.W 2.470 Elapses Sepa2Wn Pa. 30,83229 1,519.35 30.83229 892.69 10,000.00 2.25 Clearance Faces Pass 22,551.24 1,441.40 22,55134 857.85 7,957.57 2.470 CenOe DlMan. Pass - 22,336.38 1.459.74 9,338.38 847.75 12.700.00 2.305 Btpse Sepanlbn Pa36- 9.430.38 1,460,40 27.438.38 847.91 12800.00 2.384 Clearance Fack4 Pass - 30.656.67 2.925.42 30,&56.87 2,348.88 12500.00 8074 Cie.. Facbr Pass - 28.310.57 1.7029 28,310.57 1,268.50 11,10D.W 3.405 Centre Delay Paas 28,590.88 1.811.98 2,30.88 134220 11,557.57 3.100 ElliM Weston Pa4a- 2,ne.15 1.840.09 2,7m.15 1,254.05 11,7W.W 3.142 Ckamnu Facbr Pass. 28,670.29 1,32.77 20,570.29 1,353.42 11,300.00 3.09 CaMre DislenW Pass 28,997.16 1,070.90 20,997.16 1,330.32 11,700.00 3.425 Ellipse Sepmakn Pass - 29,4W.29 1,940.77 29,400.29 1,38259 12.200.00 3.324 Cleannu Feder Pass - 30,825.80 423.82 3,625.98 20530 13,1W.0D 3.057 Cleennce Feeler Pass - 3D,625.3 423.82 30,82598 M.20 13,157,0 3,9 Cleadan sftc Pass - 28,30.10 1,23]0 28,058.10 740.15 11,557.00 2,349 Canam Dn. Adze - 29,13.70 1,308.19 29,186.70 71624 11,9c0.W 2200 takes ftemsen Rem - n,35100 1,334.2 20.351.00 725.3 12,100.3 2.193 Cleannu Facbr Paas - 26.145.3 2303.50 26,145.3 1}44.08 9,357.57 4.805 CenOe Eden. Pass 3 Marth, W19 - 14:47 Pepe 201`6 COMPASS Ill" ConocoPhil I i ps Coo6coPhillips Abske Inc _WNS Western North Slope Anticollision Report for Plan: CDS-98 (11B)-CD"8L1 wp04.1 Tnv. Cylinder NaM PmalmHy Scan on Cumnl Surv%Mla (Nom Rereranw) Refnence DnlBn: CM Alpine Weal Pad - Plan: C06-98 "IBS -00648.1-CDiABL1 wp04 Scan Rame.: 13,820.00 b W,706.50 .11, Measured DIM. Scan Radius 4 3,250.77 uaN. CWA.mm FA tp,.bNb UcIl.NI. Max Elllpe 8epamM,.la UnIMNN Measured Mlnlmum @lA... mod Ellipse @M.aeund claannu Summary BnMI Sib Name Dome Dlabnce Daen SepaMun Mo. Factor Name. Slan6on Wamirp comparison SO None -WNIBen Name - Damn IueN Man) (ueN bah) caR Pion: 005-26(13C)-CD5-28- CDS20 M02 v3(13C) 26,500.06 2,231.03 28,500.06 1,718.90 9,000.00 4.339 Ellipse Sapam00n Pass - Plan :CD5.2B(IX)-CDS28-CD5-20 x,4020(13C) 27,014.97 2.355.41 9,414.97 1,7&5.4" 10.500.00 4.133 CIWRnce Factor Pass- PIan:CD 90(12B)-CDS80(120)-C05-90 M02W 13,054.53 1,377.91 9,054.53 1,157.70 17,100.00 8.257 Centre Distance Pan- PIen:CDi90(I2B)-WS90(12B)-CD5-90 M02 20.811.34 1.520.13 20,811.34 053.94 31.767.10 2.317 clearance Factor Pass- Plan:GD5.92-WA 92-CDS92 MOD 14.427.26 794.47 14,42736 47899 10,4000o 2.518 Ckarence Facbr Pma- Plan:CDS92-005-92-CD5-92x,405 13,850.62 SN24 13,85082 45581 10,000.00 3.768 EBilae Separation Pass- Ran: CDS93(IM -CDS93-CD5A3 x,4020,42.7) 14,451.52 1258.02 14,451.62 1,071.67 10,70080 0151 CNaIaIMR Factor PaSs- Pace CD5-93(12A)-CDS93-W5A3 M020(12A) 13,846.91 124214 13.046.91 1,166,79 10,800.D0 16,484 Comm Di9alar Paas- Pan:C05-94(13.7)-CDS94-CD5-94 np03 V3 (IM) 14,544.77 2.115.05 14.W.77 1,793.15 10,6W.00 0.570 Clea. F.mol Paa- PlanCflS (13A)-CDS94PH1-WS94PH1.01 14,W.77 2,115.D5 14,W.n 1,793.02 10,650.00 0.588 Cie.Fadm Pa3a- Pbn:CD5S(1(118)-CDS98-W5-0B(II (8"04.1 -- Preim: CDS29(14C)-CDS29-CD-29xp010(14C 20,099.95 24303-76 20,899.95 2,047811 7,100.00 9002 Centre Ubama Pma- Preim:CDS29(14C)-CD5-29-CDS29MDIv3(I4C 21,270.02 2,347.15 21,278.02 1,998.20 7,790.00 6.888 Elio.S,,oaon Pd58- Prato CDS29(14C).CD5-29-CDS2WVD10(14C 22097.16 2.726.84 22,097.16 2232.31 9,W0.00 5.514 Cl mance Faclor Pd3s- Preto : CDS95(1M)-C05-95-C06-95M01 a3 (14A 15,62"85 2,529.82 15.627.65 2195.78 9,300.00 7.574 Caere Damon Pass. pollen. CD5­95(I")-C05.95-W6-95MDI0(14A 15,179.30 2,559.77 15.179.38 2.136.13 9,900.00 8.342 EHHW Separation Pasa- Reim, CDS95(I")-CD5-95-CDS-95.ap01J (I4A 14,638.58 2,670,40 14.838.58 2,198.42 10,600.50 5.657 CkamnceFehr Pass- PRM.: CDS90(15A)-CD5A6-CD5-96 op020(9B 14,569.18 2,614.16 14,569.18 2.388.60 8180950 11.590 Centre Dsnrw Pass. P.l. CD&N(15A)-CDNQS-CDSWxp020(130 27,059.36 2.980.72 27.059.36 $355.9 25,838.82 4129 Ckmlce Factor Pass- Pre1m: CDS97(16A)-CDS97-CD&W xpOt 0(IDA 17,665.44 3,112.27 17,885.44 2.00388 7.700.00 9.530 CeMn Monts Pass- P.I.CDS7(16A)- COW. C05�97 M010(I6A 17.00831 3,145.82 17,DO2.31 2,82851 0.500.0D 9.914 EApw Sapamonn Pab- PRIm: WS97(18A)-WS97-W5-97 on0l0(16A 10856.30 3,257.48 18,256.30 2871.07 9,400.00 &430 Cllnnce Factor Pass- NIS CD5-24-CDS24-005-24MID 28,99137 2.774.98 28,98197 2177.82 11,400.00 4.047 Canoe Mstance Pa. - OOL89:505-24-CDS24-W5-24x,410 R,: C05-24 - (30S24 - W5-24 MID 29.3"095 2,780.47 29,34645 2,189.52 11,80D.00 4.551 EIIIpce Separdl.n Pace - RD, W5-24-CDS24-W534 MID 30.056.31 2,827]5 30,058.31 2,14956 12800.00 4,481 Clearer F.Mr PaR- R9:W5-24-C 24.(05-24 28,20054 2,799.76 20,280.84 2241.21 10,650.00 5.013 Came DionM2 PeR- Rig C05-24-CD5-24-505.24 28.780.80 2,802A7 29,780.80 $184.32 12,300.00 4.534 Ellipse Seppmeen Pon - RPMS.24-CDS24-CD5.24 29.964.59 2.009.17 29,964.59 2187.14 12503.00 4.516 Cbnanc¢FaCbr Paao- OB ktamh. 2019 - 1441 Pa0a3p18 WMPASS ConocoPhil lips Anticollision Report for Plan: CDS-98 (1113) - C135-981-1 wp04.1 Survev tool nrooram F. To BurveyNhn Survey Ton! heal lush 40.80 1.900.00 GYDGUss 1,900.00 2,290.00 R&M-IFRAK-CP -SC 2,280.00 13,820.00 MN9sIFRAK-CA -SC 13,020.00 14,550.00 Cn5-981-1 w1N14 INC.TREND 14,350.00 15,850.00 CD5-981.1 wp34 MWD 14350.00 30,708.50 CM -98L1 wp54 MWDNFRAI( SC FJ800eetmr semis ere mfrelaled awss eervey iml aeon I mels. Calculated eliPses inmi,rete Wdsm a m. Sep iet'wn is the acwal dislanw besween elllpsdlds. Distance Beeemn Me s is Ne YrelghtiM d sMsm aseesen welfare mntma. CMas4. Factor=Diesar Between Pmlles I(DisUM. Between Rofles-DOW Separsten). Nt slam coordinates were miNu%M tzsng Me Minimum Curvaiem meMW. Conocolehillips Alaska Inc WNS Western North Slope 0 Memh, 2019 14,47 Page 4 06 Comi 10:53, MuM W 2019 CD5-98L1 wp04.1 Ladder View 300 c 0 j 0200 W of m d V O m X100 — m V 0 15000 17500 20000 22500 25000 27500 30000 INeasured Eeoth ELFbEh FFCCFPA CPEINC EETPILE th Fran Eeoth To Eurvev/Flan Tool T E RE Nan 40.80 1900.00 CC5-98 (11E -P) Ao04.1 CYE -CC -EE 7449.69 13821.00 7-5/8 x 11 1900.00 2290.00 CE5-98 (11E -P) Ao04.1 AV E+I1FF-Pk-CP2-EC 7594.70 3070E.50 4-1/2x6-1/2 2290.0013820.00 C15-98 (11E -P) vo04.1 AV E+IFF-PH-CP2-EC 13820.0014350.00 CC5-98L1 %A o04 (CE5-98L1) INC+TFE(`E 14350.0015850.00 C C 5-98L 1 to o04 (C E 5-98L1) KV E 14350.00 30708.50 CC5-98L1 Ho04 (CE5-98L1) NV E+IFF-PN-CP2-EC 60 __....— _...... — —...I 0 Z6 `m d w m c30 -- — v o m d v 0 14000 14250 14500 14750 15000 Fartlal INeasured Eeoth 14:51, March 06 2019 CD5-98L1 wp04.1 TC View ELFVEO FFCCFPE EEC TIC I, CETP ILE Fran To Tcal AC Inc Pzi TVC Clea TFace Target Annotation 40.80 1900.00 CYC-CC'E13820.00 73.49 140.00 7449.4E 0.00 0.00 VC F: 15.91100' C LE. -25°T F. for 12E' 1900.00 2290.00 EVC+IFF-PN-CP2-EC 13832.80 75.34 139.11 7452.92 15.90 -25.00 Fad for 30' 2290.00 13820.00 EV CLIFF-PV-CP2-EC 13862.80 75.34 139.11 7460.82 0.00 0.00 Stan 4.88°/100'ILE. 5.43 -TF. far 515.48' 13820.0014350.00 IPC.TF EPC 14350.0015850.00 AVC 14378.28 100.39 141.4E 7479.55 14394.39 100.39 141.46 7476.65 4.88 0.00 5.43 0.00 Fcl0 for 16.11' Etart 4.881100 CLE. 135 -TF. for 31273' 14350.00 30708.50 EV 1.IFF-PI,-CP2-EC 14707.12 89.48 1522.18 7449.70 4.88 135.00 C15-9811 1. Fee1122418JWow for16001.38' 30708.50 89.48 152.18 7594.70 0.00 0.00 CC5-90112.Tce 122418JFTE:20708.5'EE.7594.7'16C CPEPC CETPILE Tbl AC Pana 7449.69 13821.00 7-5/8 x 11 7594.70 30708.50 4-1/2 x 6-1/22 0 180 D5-98 (11B -A) wp04. 30 50 0 - - 13820 0 0 13820 - 14000 12 14000 - 14190 14190 - 14370 300 fi0 14370 - 14550 14550 - 14740 14740 14920 9 6 14920 15100 15100 - 15750 15750 16400 16400 - 17050 270 90 17050 - 17700 17700 - 18350 18350 - 19000 19000 - 19650 19650 20300 0300 - 21600 90 1600 - 22900 240 12C 2900 24200 12 4200 - 25500 5500 - 26810 6810 28110 1 8110-29410 210 150 9410 30709 180 1L:SfMOd1 �)VB CD5-98L1 wp04.1 13820.00 To 16000.00 AC Flipbook ELFbEV FFCC FAN ossa (118-a) 1nrp04. 0 0 13820 -14000 13820 oth Fron Cloth To Tool 40.80 1900.00 C1LCC �9 1900.00 2290.00 hV CeIFF-Pk-CP 14000 -14190 2290.00 13820.01) h Ci FF -Pk -CP 90 13820.00 14350.00 IPC.a FEPC 14350.00 15850.00 KV 1 330 is 0 30 14190 -14370 14350.00 30708.50 PV C+IFF-Pk-CP - 14370 14550 as 60 i a 14550 - 14740 - 14740 14920 CP81PC CEIP IL£ TbC PC Pane 7549.69 13821.00 11 300 60 14920 -15100 1/2 x - 7594.70 30708.50 4.1/2 x 6-1/2 2 15100 - 15750 15750 16400 N Pzi TFace 13832.80 140.00 5.00 16400 -17050 1383^e.80 139.11 -25.00 1 ga 13862.80 139.11 0.00 17050 - 17700 14378.28 141.46 5.43 90 14394.39 141.46 0.00 270 17700 -18350 14707.12 152.18 135.00 30708.50 152.18 0.00 18350 - 19000 19000 - 19650 3 19650 20300 20300 - 21600 240 120 21600 - 22900 22900 - 24200 24200 - 25500 25500 - 26810 212 150 90 26810 28110 180 28110 - 29410 29410 - 30709 fa -a W." CD5-98L1 wp04.1 16000.00 To 30709.00 AC Flipbook ELF%EV FFCCFPK D5.98 (118-A) Wp04. 0 13820 Fron Ceoth 70 Tool eth 40.80 1900.00 CVL -CC 5 0 13820-14000 1900.00 2290.00 KV C4IFF-PkCA; 2290.0013820.00 KV 14IFF-WCP 90 14000 -14190 13820.0014350.00 IP C ITF E P C 1730 330 30 14350.00 15850.00 KV C 14190 -14370 14350.00 30708.50 KV [.IFF -Pk -CP 14370 - 14550 60 14550-14740 14740 -14920 CP511,C CETPILS Tec n C None 7449.69 13821.00 7-5/8 x 11 7594.70 30708.50 4-1/2 x6-1/2 300 6Q 14920 -15100 15100 - 15750 15750 16400 A C Pzi TFace 138220.00 140.00 0.00 13832.80 139.11 -25.00 16400 -17050 13862.80 139.11 0.00 14378.228 141.46 5.43 17050 -17700 14394.39 141.46 0.00 90 270 14707.12 152.18 135.00 17700 -18350 30708.50 152.18 0.00 I 18350 19000 19000 19650 3 19650 20300 20300 - 21600 240 120 21600 22900 60 22900 - 24200 24200 - 25500 25500 26810 210 150 90 26810 28110 180 28110 29410 29410 - 30709 CD5-98L1 wPO4.1 16000.00 To 30709.00 1 Spider E astina !9500 usftrin) ConocoPhillips Alaska Inc WNS Western North Slope C135 Alpine West Pad Plan: CDS-98 (11B) 50103xxxxx00 CD5-981-1 Plan: CD5-98L1 wp04 Error Ellipse Survey Report 11 April, 2019 Company: ConocoPhillips Alaska lnc_WNS Project: Western North Slope Site: CDs Alpine West Pad Well: Plan: CDS-98 (11 B) Wellbore: CD5-98L1 Design: CD5-981_1 wp04 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well PlanCD5-98 (11B) -Slot 98 Plan D25 @ 74.70usft (025) Plan D25 @ 74.70usft (D25) True Minimum Curvature 2.00 sigma OAKEDMPI Project Western North Slope, North Slope Alaska, United States Map System: System Datum: Mean Sea Level Geo Datum: (usft) (usft) Survey (Wellbore) Using Well Reference Point Map Zone: 40.80 1,900.00 CDS-98(11 B -A) wp04.1 (CD5-98) Using geodetic scale factor Gyrodata gyro single shots 1,900.00 2,290.00 CD5-98(11 B-A)Wp04.1(CD5-98) MWD+IFR-AK-CAZ-SC Site CD5 Alpine West Pad 13,820.00 CD5-98(11 B -A) wp04.1 (CD5-98) MWD+IFR-AK-CAZ-SC Site Position: Northing: 14,350.00 CD5-981_1 wp04(CD5-98L1) Latitude: From: Map Easting: 15,850.00 CD5-981_1 wp04(CD5-98L1) Longitude: Position Uncertainty: 0.00 usft Slot Radius: 13.200 in Grid Convergence: -1.15 ° MWD+IFRAKCAZSCC Well. Plan: CD5-98 (118) - Slot 98 Well Position +NIS Northing: Latitude: +EI -W Easting: Longitude: Position Uncertainty 0.00 usft Wellhead Elevation: 0.00 usft Ground Level: 33.90 usft Wellbore CD5-981_1 Magnetics Model Name Sample Date Declination Dip Angle Field Strength 1°) 19 (nT) BGGM2018 7/1/2019 16.07 80.72 57,373 Design C135-981_1 wp04 Audit Notes: Version: Phase: PLAN Tie On Depth: 13,820.00 Vertical Section: Depth From (TVD) +N1 -S +EI -W Direction (usft) (usft) (usft) (°I 40.80 O.Do 0.00 164.20 Survey Tool Program Date 4/11/2019 From To (usft) (usft) Survey (Wellbore) Tool Name Description 40.80 1,900.00 CDS-98(11 B -A) wp04.1 (CD5-98) GYD-GCSS Gyrodata gyro single shots 1,900.00 2,290.00 CD5-98(11 B-A)Wp04.1(CD5-98) MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 2,290.00 13,820.00 CD5-98(11 B -A) wp04.1 (CD5-98) MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 13,820.00 14,350.00 CD5-981_1 wp04(CD5-98L1) INC+TREND Inclinometer +known azi trend 14,350.00 15,850.00 CD5-981_1 wp04(CD5-98L1) MWD MWD -Standard 14,350.00 30,708.50 CD5-98L1 wp04(CD5-9BL1) MWD+IFR-AK-CAZ-SC MWD+IFRAKCAZSCC 4/112019 9:23:03AM Page 2 COMPASS 5000.14 Build 65D Company: ConocoPhillips Alaska lnc_WNS Project: Western North Slope Site: CDS Alpine West Pad Well: Plan: CD5-98 (11 B) Wellbore: CD5-98L1 Design: CD5-981.7 wp04 ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Plan Survey Tool Program Date 4/11/2019 Depth From Depth To (usft) (usft) Survey (Wellbore) Tool Name Remarks 1 40.80 1,900.00 CD5-98 (11 B -A) wp04.1 (CD5-98 GYD-GC-SS Gyrodata gyro single shots 2 1,900.00 2,290.00 CDS-98 (11 B-A)wp04.1(CD5-98 MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 3 2,290.00 13,820.00 CD5-98 (11B -A) wp04.1 (CD5-98 MWD-IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC 4 13,820.00 14,350.00 CD5-981_1 wPO4(CDS-98L1) INC+TREND Inclinometer + known azi trem 5 14,350.00 15,850.00 CD5-981_1 wp04 (CD5-98L7) MWD MWD - Standard 6 14,350.00 30,708.50 CD5-98L1 wp04 (CD5-981_1) MWD+IFR-AK-CAZ-SC MWD+IFR AK CAZ SCC Position uncertainty and bias at survey station Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (D25) Plan D25 Qa 74.70usft (D25) True Minimum Curvature 2.00 sigma OAKEDMPI Measured Inclioafion Az1muM vertical Ri9hside "..I v mcal Ma9nnude somiina}or semi -minor Dep* DeP* Ener Blas Error Bias Error Bias of Bias Error Ener Azimu* Tool fusm 1°I PI (..ft) (..ft) (o,m (usn) (ush) (uaal (usm (usm (.oft) (..n) (,I 13,82000 73.49 Mel) 7M948 27.09 -9.15 9844 0.85 30.15 8.32 936 9857 17.29 13669 INC+TREND(1. 4) 13,82100 7364 139.93 7.49.77 27.09 -9.15 9844 0.85 30.15 8.32 938 98.57 17.29 13669 INC -TREND (1, 4) 13.83280 7534 139.11 7,452.92 2]38 +9.12 99.23 0.01 30.15 833 936 99.31 1]31 136.74 INC+TREND(1, 41 13,08280 75.34 139.11 7,460.52 2747 -9.12 10522 0.81 30.23 8.34 9.35 105.20 17.38 137.02 INC+TREND(1, 4) 13.900.00 77.15 139,29 7.469.36 28.05 .9.05 118.52 082 sew 835 9.34 118.58 17.50 137.50 INC+TREND(1, 4) 14,000.00 82,01 13975 7,487.44 30.87 5.84 174.30 085 3218 0.37 9.30 17433 17.07 13855 INC+TREND(1,4) 14,100.00 88.87 140.20 7.497.13 39.03 4.58 243.77 0.88 3934 8.38 926 24381 10.15 13e14 INC+TREND(1. 4) 14,20000 91.73 140.65 7.98.36 4192 -8.27 317.10 0.91 41.79 8.39 922 317.16 10.39 139.53 INC+TREND(1, 4) 14.300.00 96.59 141.10 7,491.11 5806 -7.91 39370 0.94 55.02 838 9.18 39379 1882 139.04 INCrTREND(1. 4) 14,378.28 100.39 141.46 7,479.55 56.39 -7.59 423.04 1.14 56.34 8.37 9.17 423.19 1875 139.94 MWD(1, 5) 14,394.39 100.39 141.48 7,476.65 5689 9.58 42300 122 56.35 8.37 9.18 423.15 18.76 13994 Mello (1. 5) 14,400.00 10020 141.65 7,05.85 58.41 -7.61 42295 125 56.35 0.37 9.10 423.14 10.76 139.94 mm (1, 5) 14,500.00 98.73 145.12 7.460.93 5676 6.90 421.19 1.91 5636 8.38 sm 422.91 1081 13994 um (1. 5) 14,80000 9324 148.55 7,452.24 5870 -0.16 417.96 2.54 56.37 8.35 929 422.71 10.90 13994 MwD(1. 5) 14,70000 8913 151.91 7,449.65 58.38 -836 413.32 3.13 58.40 835 938 422.54 19.04 139.94 M (1, 5) 14,707.12 89.48 152.18 7,44970 58.38 4.37 41293 3.17 56.41 8.35 9.39 422.52 19.05 139.94 M (1, 5) 14,800.00 89.48 152.18 7.50.54 58.40 4.37 412.79 355 56.44 885 849 422.38 1922. 139.94 M (1, 5) 14,900.00 8948 152.18 7,451.45 56.45 5.37 412.65 3.94 58.49 8.35 9.62 42223 19.41 13994 MM (1, 5) 15,000.00 N48 152.18 7,452.35 5650 -837 412.53 474 5655 835 9.T7 422.10 19.62 13994 MWD(1, 5) 15,10000 89.40 152.18 7,453.28 56.57 -0.37 412.43 674 5662 8.35 9.92 422.00 1986 139.95 M (1, 5) 15200.00 89.48 152.18 7,454.17 58.65 4.37 412.36 5.14 56.69 8.35 10.10 421.92 20.11 139.95 MWD(1, 5) 151300.00 8948 15218 7.455.07 56.73 4.37 41231 5.54 5878 8.35 1020 421.86 2038 139.98 MWD(1, 5) 15.00.0 89.48 152.16 7.55.98 58.83 -8.37 412.29 5.94 56.87 8.35 10.40 42183 2067 139.97 MWD(1, 5) 15.500.00 09.48 152.10 7,456.69 W93 -0.37 41229 8.34 $8.98 8.36 10.70 42181 20.88 13997 MWD(1, 5) 15,600.00 09.40 152.18 7,457.79 57.05 -0.37 412.32 8.74 57.09 am 1092 421.82 21.31 13998 mm (1, 5) 15,70000 8948 452.18 7,458.70 57.17 437 41237 7.14 57.21 8.36 11.15 421.86 21.65 140.00 MWD(1, 5) 15.800.00 89.48 152.18 7,459.60 57.30 4.37 412.44 ]54 57,35 8.36 11.40 421.91 22.00 14001 MVID(1. 5) 151900.00 8948 15218 7,16051 56.57 4.38 412.86 159 56.62 8.36 871 422.45 1971 139.94 MWD+IFR-AA-CASC(2,5) 411112019 9:23:03AM Page 3 COMPASS 5000.14 Build 85D Company: ConocoPhillips Alaska lnc WNS Project: Western North Slope Site: CDS Alpine West Ped Well: Plan: CDS-98 (11B) Wellbore: CD5-9811 Design: CD5-981-1 wp04 Position uncertainty and blas at survey station ConocoPhillips Error Ellipse Report Local Coordinate Reference: ND Reference: MO Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (D25) Plan D25 @ 74.70usft (D25) True Minimum Curvature 2.00 sigma OAKEDMPI Mea4urW Incllnffien "..0, Var6cal High.lde Latent Ve"ical Magnitude Semi -Mor Samiminor Dep% nep0i Error Bias Error 8ns Error Bias of Bias Error Ener gzimuN T.W tura) n f) (--ft) (uan) (usn) (--ft) (usn) (ural (usn) (usn) (u.e) (usn) r) 15,000.00 8948 152.18 7,461.42 56.61 -838 412.83 1.59 5666 836 869 422A2 1980. 139.94 MADaIFR AK CA SC(25) 16,100.00 89.48 152.18 7,462.32 56.65 -0.38 41280 1.59 %.69 835 867 422.39 19.89 13994 MAD IFR AK -CA -SC (2 5) 16,200.00 89.48 152.18 7.,163.23 WAB 4.38 412.78 1.59 56.73 8.36 8.65 422.37 19.99 139.94 MWUMFR-AK-CA SC (2, 5) 16,30000 8948 152.18 7,464.13 56.73 8.38 412]] 159 5878 8.36 864 422.34 MD8 13990 MWD+IFR-AK- A -SC (2, 5) 16,40000 8948 152.18 7,06504 58.78 8.38 412.75 1.59 5682 8.36 862 42233 20.18 139.95 MWD+IFR-AK-CAZ-SC(2, 5) 16,500.00 89.40 152.18 7,46595 56.03 -838 412.74 1.59 %.87 837 8.61 422.31 2028 13995 MM+IFR-AK-CAZ-SC(2, 5) 16,80000 8948 152.18 ],086.85 56.88 -8.38 41273 1.59 56.92 8.37 859 422.30 20.39 139.95 MAD+IFR-AK-CAZ-SC(2, 5) 18,700.W 89.48 152.18 7,467.76 WA3 438 412.73 1.59 56.97 6.37 058 422.29 20.50 139.95 MWD+IFR-AK-CA -SC (2. 5) 1080000 89.48 152.18 7,468.67 5898 8.38 412.72 159 $7,03 8.37 857 42228 Man 139.% IAM+IFR-AK-CAZ-SC(2. 5) 16,900.00 8908 152.18 7.469.57 5704 4.38 412.72 1.59 5].08 837 8.56 422.28 2072 139.95 M IFR-AK-CAZ-SC(2, 5) 17,000.00 8948 152.18 7,47048 57.10 -8.38 41273 1.59 57.14 8.37 8.55 422.28 20.83 139% MWD+IFR-AK-CAZSC(2, 5), 17.100.00 89.48 152.18 7.471.30 57.16 -838 41274 1.59 57,20 8.37 8.55 422.28 2095. 139.% MADNFR-AK-CAZSC(2, 6) 17,200.00 89.48 152.18 7.472.29 57,22 3.38 412.75 159 5727 8.37 854 422.29 21.07 139.97 MAD+IFR-AK-CA -8C(2. 5) 17.30000 8948 152.18 7,473.20 S]29 8.38 412.76 1.59 5]33 8.37 053 422.30 21.19 139.97 MWD+IFR-AK-C -SC (2. 5) 17.40000 89.48 152.18 7,47410 57.35 4.38 412.78 1.59 57.00 837 8.53 422.31 2131 13997 MPMHFR-AK-CAZSC(2, 5) 17,50000 89.48 152.18 7.475.01 57,42 -8.38 412.80 1.59 57,47 837 8.53 42232 21.43 139.98 MWD+IFR-AK-CAZ-SC(2, 5) 17,60000 09.40 152.18 7.475.81 57.49 -8.38 41282 1.59 57.54 8.38 8.53 422.34 21.56 13995 MWD+IFR.AK-CAZSC(2, 5) 17,700.00 89.48 152.18 7.476.82 57.57 -8.38 41285 1.59 57.61 8.38 8.53 422.38 2160 139.93 MAD+IFR-AK-CAZ-SC(2, 5) 17,800.00 89.48 152.18 7,477.73 57.64 4.30 412.88 159 57.69 038 8.53 422.38 21.82 139.99 MWD+1FR-AK-CAZ-SC (2, 5) 17,900.00 89.48 152.18 7,478.63 57]2 8.38 412.91 159 57,77 8.38 8.53 422.41 21.96 140.00 MAD+IFR-AK-CA -W (2. 5) 18,00000 8948 152.18 7,479,54 57.80 -8.38 41295 1.59 57.85 8.38 8.53 422.44 22.09 14000 MM+IFR-AK-C/ -SC (2. 5) 10,100.00 8948 152.18 7,480.45 57.89 -838 41299 1.59 57.83 8.38 8.54 42 R 22.23 140.01 MWD+IFR-AK-CA -So(2. 5) 18,200.00 89.48 152.18 7,481.35 57.97 -8.38 41303 159 50.01 8.30 0.54 422.51 22.37 14001 MWD+1FR.M.0 Z-SC(2,5) 18,300.00 8948 152.18 7.482.26 58.08 538 413.08 1.59 58.10 an 055 422.55 22.51 140.02 MAD+IFR-AK-CAZ-SC(2, 5) 18,00000 8948 152.18 7.483.18 58.14 8.38 413.13 1.59 58.19 8.38 B% 422.59 22.65 14002 MWD+IFR-N(-CA2-SC(2, 5) 18,50000 8948 152.18 7.480.07 58.24 8.38 413.18 1.59 5838 8.38 8.57 42283 22.79 140.03 MAD+IFR-AK-CA-SC(2, 5) 18,60000 89.48 152.18 7.484.98 58.33 4.38 41324 1.59 5887 838 8.58 422.68 2294 14003 MWDHFR-AK-CA-ac(2, 5) 10.700.00 0948 152.18 7.485.88 50.42 -838 41329 1.59 5847 8.39 8.59 422,73 23.09 14004 MWD+IFR-AK-CAZ-SC(2,5) 10800.00 8948 152.18 7,486.79 5852 5.30 413.36 159 58.% 8.39 8.60 422.78 23.24 14004 MM+IFR-AK-CAZ-SC(2, 5) 18.900.00 8948 152.18 7,487.69 58,62 4.30 413.42 159 %.88 8.39 8.62 422.84 2339 140.05 MAD+IFR-AK-CAZ-SC(2, 5) 19,00000 8948 152.18 7.48880 58.72 8.38 41349 159 %,76 839 863 422.90 23.54 14000 MAD+IFR-N(-CAZ-SC(2, 5) 19,10000 8948 152.18 7,489.51 5882 8.38 413.% 1.59 58.87 839 865 422% 23.69 140.06MWD+IFR-AK-CA.SC(2. 5) 19,200.00 8848 152.18 7,40.41 58.93 -838 413.64 1.59 58.97 8.39 8.67 423.03 23.85 140.07 MAD+IFR-AK-CAZ-$C(2. 5) 19.300.0 89.48 152.18 7,491.32 59.03 -8.38 41371 1.59 59.08 8.39 069 423.10 24.00 14008 MWD+IFR-AK-CAZSC(2, 5) 19,400.00 89.48 152.18 7,49223 59.14 -8.30 41380 159 59.19 8.39 071 423.17 24.16 140.= MWO+IFR-AK-CAZSC(2, 5) 19,50000 8948 152.18 7.493.13 5925 830 413.88 159 59.30 8.39 073 42324 2432 140.09 MWD+IFR-AR-CAZ-SC(2, 5) 19,800.00 8948 152.18 7.49404 59.37 4.38 413.87 1.59 59.41 8.39 875 423.32 24.48 140.10 MAD+IFR-AK-0A -SC (2. 5) 19,700.00 8948 152.18 7.494.94 59.40 4.38 414.06 1.59 5952 8.39 8.77 423,40 2464 140.11 MAD+1FR-AK-CA-SC(2, 5) 19,800,= 09.40 152.18 7,4%.85 5060 -8.38 414.15 1.59 5964 800 880 42348 24.81 140.11 MWD+1FR-AK-CA-W(2,5) 19.900.00 8948 152.18 7.496.76 5972 -8.38 414.25 1.59 5976 840 8.82 423.57 24.97 140.12 MWD+IFR-AK-CAZ-SC(2, 5) 20000.00 8948 152.18 ],49].66 5984 3.30 414.35 159 59.88 B.40 885 423.66 25.14 140.13 MWD+IFR-AK-CAZ-SC(2,5) 20,100.00 8948 152.18 7.498.57 59.96 038 414.45 1.59 00.00 8.40 8.88 423.75 25,30 140.14 MW +IFR-AK-CAZ-SC(2, 5) 20,200.00 8948 152.18 7,49948 60.08 -8.38 414.56 159 60.13 8.40 891 42384 25.47 140.15 MAD+117R-AK-CAZSC(2.5) 20,300.00 8908 152.18 7,500.38 60.21 -8.38 41467 1.59 60,25 840 6.94 423.94 2504 140.16 MWD+IFR-AK-CA-SC(2, 5) 20.400.00 89.48 152.18 7,501.29 60.34 -8,38 414.78 1.59 60.38 8.40 8.97 424.04 25.81 140.16 MAD+1FR-AK-CAZ-SC(2.5) 20500.00 89,48 152.18 7,502.19 60.47 -038 414,90 1.59 60.51 840 900 424.15 25.98 140.17 WMOFR-AK-CAZSC(2. 5) 20,600.00 89.48 152.18 7,933.10 60.80 -8.38 015.02 1.59 60.64 8.40 903 42425 26.15 140.18 MWD+IFR-AK-CAZSC(2,5) 20,700.00 89.48 152.18 7,50401 60.73 4.38 415.14 1.59 60.77 840 9.07 424.36 26.32 140.19 MWD+IFR-AR-0AZ-SC(2.5) 20,000.00 8948 152.18 7,504.91 60.07 4.38 415.26 1.59 6091 840 9.10 424A8 26.50 14020 MAD+IFR-AK-CA-SC(2, 5) 20930.00 09.48 152.18 7,505.82 61,01 -8.38 415.39 1.59 61.05 8.41 9.14 424.59 26.67 14021 MAD+IFR-AI(-C -W(2, 5) 21,000.00 8948 152.18 7.5%.72 61.14 -8.38 415.52 1.59 61.19 841 9.18 424,71 26,85 140.22 MM+IFR-AK-CAZ-SC (2,5) 21,100.00 09.48 152.18 7,507.63 61.29 4.30 415.66 1.59 61.33 841 921 424.83 27.02 140.23 MWD+1FR-AK-CAZ-SC(2, 5) 21200= 8948 152.18 7,50854 61.43 8.38 415.80 159 61.47 841 925 424.96 27.20 140.24 MP IFR-AK-CAZ-SC(2, 5) 21,300.00 8948 152.18 7,50944 61.57 S38 415.94 1.59 61.61 8.41 929 425,= 27.38 14025 MWD+IFR-AK-CA-SC(2, 5) 4/112019 9.23:03AM Page 4 COMPASS 5000.14 Build 85D Company: ConocoPhillips Alaska lnc_WNS Project: Western North Slope Site: CDs Alpine West Pad Well: Plan: CD5-98 (11 B) Wellbore: CD5-981.1 Design: CD5-981-1 wp04 Position uncertainty and bias at survey station ConocoPhillips Error Ellipse Report Local Coordinate Reference: TVD Reference: MO Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CDS-98 (11 B) - Slot 98 Plan D25 Q 74.70usft (D25) Plan D25 @ 74.70usft (D25) True Minimum Curvature 2.00 sigma OAKEDMPI Measured 1.01na4on R Iiauv, veiricm ul9halde Lateral varticel Mag.JWde samlmajer s¢mimmor Depth Wan, Error Bias Error Blas Error Bias ad Bias Error Error Aalmuth Tool (usft) P) C) Juan) (.aft) (usft) (ush) (usft) (use) (usft) luet4 luaft) (--ft) 11) 21.400.00 8948 152.18 7,510.35 61.72 -8.38 41608 1.59 6176 8.41 933 42522 2]56 14028 MWD+IFR-AK-CAZ-SC(2. 5) 21,500.00 89.48 152.18 7,511.26 61,87 -0.38 41623 1.59 6191 841 9.38 42535 27.74 14027 MWD+IFR-AK-CAZ-SC(2, 5) 21,60000 89.48 152.18 7,512.16 62.02 -838 416.30 169 62.06 841 942 42549 27.92 140.28 MWD+IFR-AK-CAZ$C(2, 5) 21,700.00 89.48 152.18 7,513.07 62.17 4.38 41853 159 62.21 8,41 9.46 42563 28.10 140.29 MW IFR-AK.CAZ-SC(2. 5) 21,800.00 8948 152.10 7,513.97 6232 5.38 416.69 1.59 6236 8.41 9.51 425.77 2828 140.30 MWD+IFR-AK-CAZ-SC(2, 5) 21,90000 8948 152.18 7,514.88 6247 -0.38 416.85 1.59 6251 841 955 42591 2846 140,31 MWD+1FR-AK-CAZ-W(2, 5) 2200000 8948 152.18 ],515.]9 6263 538 417.01 159 62.67 842 960 426.06 28.64 140.33. MM+IFR-AK-0P.SC(2, 5) 22,100.00 89.40 152.18 7,51669 8279 5.30 417.18 1.59 62.83 8.42 965 426.21 20.83 140.34 MM.IFR-AI(-CA -SC (2, 5) 22200.00 8948 152.18 7,517,60 62.95 -8.38 417.35 1.59 62.99 8.42 9.70 426.37 2001. 140.35 MW WR-AK-CAZ-SC(2, 5) 22.300.00 8948 152.18 7,518.50 63.11 -0.38 417.52 1.59 63.15 8.42 975 426.52 29.20 140.38 MW0+1FR-AK-CAZ-SC(2, 5) 2260000 89.48 152.18 7,51941 63.27 -8.30 417.69 1.59 6331 8.42 9.80 42888 29.38 140.37 MWD+1FR-AK-CAZ-SC(2. 5) 22,500.00 0940 152.18 7,52032 6344 5.30 41187 159 6348 8.42 985 426.85 29.57 14038 MWD+IFR-AR-C -SC (2, 5) 22,800.00 89.48 152.18 ],52122 6360 5.38 41805 159 63.64 842 9.90 427.01 29.75 14040 MWD+IFR-AK-,WSC(2, 5) 22.700.00 8948 152.18 7,522.13 63.77 -838 418.24 1.59 83.81 842 995 427.18 29.94 14041 MWD+IFR-AK-CAZ-SC(2, 5) 2200000 8948 152.18 7,523.04 63.94 538 418.42 159 6398 842 10.00 427.35 30.13 140.42 MWD+IFR-AK-CA2-6C(2, 5) 22.90000 8948 152.18 7,52394 64.11 530 418.62 159 64.15 842 Mrs 427.53 30.31 14043 MWD+IFR-AK-CAZ-SC(2, 5) 23,000,00 8940 152.18 1.524.85 8428 5.38 418.81 1.59 64.32 843 10.11 427.71 30.50 14045 MWD+IFR-AK-CA-6C(2, 5) 23,100.00 8948 152.18 7,525.75 64.46 -8.38 419.01 159 64.49 8.43 1017 427.89 3069 140.46 MWD+IFR-AK-CAZ-SC(2,5) 23$00.00 89.48 152.18 7,526.66 64.63 -838 419.21 1.59 64.67 843 10.23 42807 30.88 14047 MWD+IFR-AK-CAZ-SC(2, 5) 23,30000 89.46 152.18 7,527.57 64.81 -6,38 419.41 159 6485 0.43 1028 428.26 31.07 14049 MWD+1FR-M-CAZ-SC(2, 5) 23.40000 8940 152.18 7,528.47 64.99 430 419.61 159 65.02 6.43 1034 42845 31.26 140.50 MWD+IFR-AK-0A2-SC(2, 5) 23,500.00 09.48 152.18 7,529.38 65.17 5.38 41982 1.59 65.20 8,43 1040 428.64 31.45 14051 MWD+IFR-AK-CA-SC(2,5) 23,800.00 8948 152.18 7,630.28 65.35 -8.38 420.04 1.59 65.39 8.43 1046 428.83 31.64 14053 MWDMFR-AK-C -SC (2+ 5) 23,700.00 89AS 152.18 7,531.19 65.53 -038 420.25 1.59 6557 843 10.52 429.03 31.83 140.54 MM+IFR-AK-CAZ-SC(2, 5) 23,800.00 8940 152.18 7,532.10 6531 4.38 420.47 1.59 65.75 843 lam 42923 32.02 140.56 MM+IFR-AK-CP -SC (2. 5) 23,900.00 09.48 152.18 7,533.00 6590 5.38 42069 1.59 65.94 8.43 10.64 429.43 32.21 140.57 MWD+IFR-AK-CAZ-SC(2, 5) 24,000.00 8948 152.18 7,533.91 66.09 -8.38 420.91 1.59 66.12 B43 10.70 429.64 32.40 140.50 MWD+IFR-AK-CAZSC (2,5) 24,100.00 8948 152.18 7,534.02 56.27 -838 421,14 1.59 66.31 8.44 10.76 42985 32.59 14060 MM+)FR-AK-CAZ-SC(2, 5) 2420000 8948 152.18 7,535.72 6&46 -6.38 421.37 159 66.50 6.44 1083 430.06 3279 14061 MWD+IFR-AK-CAZ-SC(2. 5) 24,30000 0940 152.18 7,53683 6866 5.30 421.60 1.59 8869 8.44 1089 43028 3298 14063 MWD+IFR-At(-CAZ-SC(2, 5) 24.400.00 89.48 152.18 7,537.53 66.85 0.38 421.84 1.59 66.89 8.44 10.96 430.49 33.17 140.64 MWD+IFR-M.0C -SC (2, 5) 24.500.00 8948 152.10 7,538.44 67.04 -8.38 422.08 1.59 67.08 6.44 11.02 430.72 33.36 140.66 MWD+IFR.AK-C -SC (2, 5) 24,600.00 89.48 152.18 7,539.35 6124 -8.38 422.32 1.59 67.28 844 1109 43094 3355 140.67 MWDMFR-AK-CAZ C(2. 5) 24,700.00 8948 152.18 7,540.25 67.43 4.30 422.57 159 6]47 844 11.15 431,17 33.75 140.69 MWD+IFR-AK-CAZ-SC(2, 5) 24,800.00 09.40 15218 7,541.16 67,63 4.38 422.81 159 6167 8.44 11.22 431.40 3394 140]0 MWD+IFR-AK-CAZ-W(2.5) 24.900.00 8948 152.18 7,54207 67.83 838 42307 1.59 67.87 8.46 929 431.63 34.13 140.72 MM+IFR-AKCAZSC(2, 5) 25,00000 8948 152.18 7.542.97 68.03 -8.38 423.32 1.59 68.07 844 11.35 431.86 34.33 140.73 1AWD+IFR-AK-CA-SC (2.5) 25.100.00 89.48 152.18 7,543.88 68.23 -038 423.58 1.59 6827 8.44 11.42 432.10 3452 14075 MWD+IFR-AK-CAZSC(2.5) 25200.00 0948 152.18 7.544.78 6844 538 423.84 159 6847 8.45 1149 432.34 34.71 140.76 MWD+IFR-AK-CAZ-SC(2,5) 25,300.00 8948 152.18 7,54569 6864 5.38 424.10 1.59 68.68 8.45 11.56 43258 34.90 14078 MW IFR-AK-CAZ-SC(2, 5) 25.00000 8948 152.10 7.545.60 68.85 -8.38 424.37 159 68.88 845 1163 432.83 35.10 140.80 MWDAFR-AR-CAZ-SC(2, 5) 25,500.00 8948 152.18 7,547.50 69.05 -8.38 42463 1.59 Sam 845 1130 43308 35.29 14081 MWV+IFR-ARCA-SC(2,5) 25,00.00 8948 152.18 7.548.41 6926 838 424.91 1.59 6930 845 11.77 43333 3548 140.83 MWD+IFR-M.,WSC 12.5) 25,700.00 09.48 152.18 7,54931 6947 538 425.18 1,59 69.51 845 11.84 433.59 3560 140.85 MW +IFR-AK-CAZ-SC(2, 5) 25.800.00 8948 152.10 7,550.22 69.68 -8.38 42548 1.59 69.72 8.45 11.92 433.84 35.87 140,86 MWD+IFR-AK-CAZ-SC(2,5) 25,900.00 Was 152.18 7.551.13 6989 -838 425.74 1,59 69.93 845 11.99 434.11 36.07 140.80 MWD+1FR-AK-CA2-SC(2, 5) 26,00000 8948 152.18 7,6520:1 70.11 -838 426.02 1.59 70.14 8.45 1206 434.37 38.28 14090 MWD+IFR-AK-CA-SC(2, 5) 26,10000 8948 152.18 7,55294 7032 838 426.31 1.59 7038 8.45 12.13 434.63 3645 140.91 MWD+IFR-AK-CA SC(2,5) 26,200.00 0948 152.18 7,553.85 70.54 4.3B 428.60 1.59 70.57 045 1221 434,90 36.65 140.93 MWD+1FR-AK-CAZ-SC(2, 5) 26,300.00 8948 152.10 7.554.75 70.75 -8.38 426.89 1.59 70.79 8.46 1228 435.18 36.84 140.95 MWD+IFR-AK-CAZ-SC(2, 5) 28,400.00 8948 152.18 7,555% 70.97 -an 427.19 1.59 71.01 846 12.36 43545 37.03 14096 MW0+IFR-M-CAZ-SC(2, 5) 26,50000 8948 152.18 7.556.56 71.19 0.38 42748 159 71.23 846 12.43 43573 3123 140.98 MWD+IFR-AK-0A2-SC(2, 5) 26,600.00 8946 152.18 7,55147 71.41 5.30 42770 1.59 7145 8.46 1251 438.01 37.42 141.00 MWD+IFR-AK-CASC(2, 5) 26.700.00 89.48 152.10 7,558.38 71.63 -8.38 428.09 1.59 7167 8.46 1258 438.29 37.61 14102 MWD+IFR-AK-CAZ-SC(2, 5) 4/11/2019 9:23.03AM Page 5 COMPASS 5000.14 Build 85D Company: ConocoPhillips Alaska lnc WNS project: Westem North Slope Site: CDs Alpine West Pad Well: Plan: CD5-98 (11 B) Weltbore: CD5-981-1 Design: C05-9811 wp04 Position uncertainty and blas at survey station ConocoPhillips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 @ 74.70usft (D25) Plan D25 @ 74.70usft (D25) True Minimum Curvature 2.00 sigma OAKEDMPI Measured Incllnafipn A9muth wmr .l Ri9h.ide lateral vmmal Ma9aiad. Semlmal.r Sarni -minor Cep& pep& E., Blas Error Blas Error Bias .1 Blas Ermr Error Puma& Tool (dam (9 N I..N Nan) (u.n) (uan) Nan) (.an) (9.n) (usn) (uan) (oss) 11) 28800.00 89.48 152.18 7,559.28 7195 B38 428.40 1.59 7169 8.46 1266 436.58 37.80 14103 MVA+IFR-AKCA-SC(2. 5) 26,900.00 8948 152.18 7,560.19 7208 -8.38 42870 1.59 7211 846 12.74 436.86 30.00 14105 MM-IFRR AK- CP -SC (2, 5) 27,000.00 8948 152.18 7,561.09 72.30 -0.38 429.02 1.59 7234 846 12.81 43715 38.19 141.07 MM -IFR AK -CA -SC (2r 5) 27,100.00 8940 152.18 7.562.00 72.53 -038 429.33 159 72.58 846 12.89 437,45 38.38 141.09 MVA+IFRAK-CA-SC (Z 5) 27.200.00 89.40 152.18 7,56291 7275 4.38 429.65 1.59 7279 848 1297 437.74 3858 14111 MWD.iFR-AK-CA-SC(2, 5) 27,30000 89.48 15218 7,663.81 7298 5.38 42997 1.59 7101 847 1305 438.04 38.77 141.12 MWD+1FRAKLALSC(2, 5) 27,400.00 89.48 152.18 7,554.72 73.21 5.38 430,29 1.59 73.24 e47 13.13 438.35 38.96 141.14 MWD+IFR-AK-CA -SC (2, 5) 27,500.00 0948 15218 7,565.63 73.44 -838 430.62 1.59 7347 8.47 13.21 438.65 39.15 WAS MWD+IFR-AWCALSC(2, 5) 27,00.00 Was 152.18 7,566.53 73.67 430 43095 1.69 73.70 847 13.29 438.98 3934 141.18 MWD+IFR-AK-CA-SC(2, 5) 2770000 89.48 152.18 7,56744 MM 5.38 431.28 1.59 7393 8.47 13.37 439.27 39.54 141.20 MWD+IFR-AK-CMSC(2,5) 27,80000 8948 152.18 7,568.34 74.13 -838 43162 1.59 74.17 847 1345 43958 39.73 141.22 MWD+IFR-M.CA SC (2, 5) 27,900.00 89.48 152.18 7,569.25 74.37 -am 431.96 159 74.40 B.47 1353 43990 39.92 14123 M IFR-AK-CMSC (2, 5) 20,00000 89.48 152.18 7,570.16 74.60 -838 432.30 159 74.64 847 13.61 44022 40.11 141.25 MM -IFR AK-CA-SC(25) 28.100.00 8948 152.18 7,57106 74.84 5.30 432.84 1.59 74.87 847 1369 440.54 40.30 1412]MWD+IFR-AK-CA-SC(2, 5) 28,20000 89.48 152.18 7,571.97 75.07 5.38 43299 1.59 75.11 8.47 1077 440.85 4049 141.29 MM+IFR-AK-CA2 C(2.5) 28.300.0 8948 1$2.18 7,572.88 75.31 -8.38 43333 1.59 75.35 0.47 13.85 441.19 4068 14131 MW0+IFR-AK-CAZSC(2.5) 28,40000 8948 152.18 7,573.78 75.55 -0.38 433.69 159 75.58 &0 13.93 44162 40.87 14133 MWD+IFR-AK-CA -W(2, 5) 20.500.00 8948 152.18 7,57669 7579 -038 434.04 1.59 75.82 848 1402 441.85 4108 141.35 MWD+IFR-AK-CAZSC(2,5) 28.800.00 09.48 152.18 7.575.59 76.03 4.38 434.40 1.59 78.03 848 14.10 442.18 41.25 141.37 MWD+IFR-AK-CA -SC (2, 5) 28.70000 8948 152.18 7,578.50 76.27 -8.38 43476 1.59 76.30 848 14.18 442.52 4144 141.39 MWD+IFR-AK-CASC(2, 5) 28,800.00 89.48 152.18 7,577,41 76.51 -0.38 435.12 1.59 78.55 848 14.27 44286 41.63 141.41 MWD+1FR-AK-CA-SC(2. 5) 20.900.00 8948 152.18 7,578.31 7876 -8.38 43548 169 76.79 8.48 14.35 44320 41.82 141.43 MWD+IFR-N(-CA-SC(2, 5) 29,000.00 0940 15218 7,579.22 7)00 -8.38 435.85 1.59 77.03 8.48 1443 44155 42.01 14145 MW IFRA&CA -W(2, 5) 29.10.0 0948 152.18 7,580.12 77.25 4.38 436.22 1.59 A.28 848 1452 443.90 4220 14147 MWD+IFR-AK-CA -SC (2, 5) 29,200.00 8948 152.18 7,581.03 77.49 4.38 43660 1.59 7152 848 140 44425 4239 14149 MWD+IFR-AK-CAZ C(2, 5) 2$300.00 8948 152.18 ],581.94 77.74 -0.38 436.97 169 77.77 848 14.69 444.60 42.58 141.51 MWD.IFR-AK-CA-SC(2, 5) 29,400.00 8948 152.18 7,582.84 77.99 -838 437.35 1.59 78.02 8.49 14.77 444.98 42.77 141.53 MWD+1FR-AK-CA-SC(2.5) 29,500.0 0948 152.18 7.583.75 7824 838 437.73 1.59 78.27 849 lass 44531 42.95 141.55 MM+IFR-A3(-CMSC(2, 5) 29,600.00 Was 152.18 ],58466 78.48 5.36 438.12 1.59 7852 849 14.94 44888 43.14 141.57 MWD+IFR-AK-CA -SG (2. 5) 29700.00 8948 152.18 7.505.56 7874 41.38 43851 1.59 7877 8.49 1503 446.04 4333 141.59 MWD+IFR-M-CMSC(2, 5) 29.0000 89.48 152.18 7,586.47 78.99 -0.38 438.89 159 79.02 849 15.11 44841 43.52 141.61 MWD+IFR-AK-CAZ C(2. 5) 29,900.00 8948 152.18 7,587.37 7924 -0.38 43929 1.59 79.27 8.49 15.20 446.77 4370 141.63 MWD+1FR-AK-CA-SC(2, 5) 30,000.00 8948 152.18 7,688.28 79.49 -0.38 43968 1.59 79.52 8,49 1529 447.15 43.89 141.65 MWD+IFR-AK CA -SC (2. 5) 30.100.00 0946 152.18 7,589.19 7974 4.38 440.00 1.59 79.78 849 1537 447.52 44.07 141.87 MWD+IFR-At(-C -SC (2, 5) 30$0000 8948 152.18 7,590.09 80.00 5.38 44048 1.59 8003 8.49 1546 447.90 44.26 141.69 MW IFR AK-CAZSC(2, 5) 30300.00 8948 152.18 7,591.00 8025 4.3a 44068 169 00.28 849 1555 40.28 4445 141.71 MWD+IFRAK-CAZSC(2, 5) 30,40000 8948 152.18 7,59190 80.51 -0.38 441,29 1.59 80.54 849 15.64 44866 4463 141.73 MWD+IFR-AK-CAZSC(2, 5) 30.50.00 8948 152.18 7,592.81 80.77 -8.38 441.70 159 80.80 8.0 1572 449.04 44.81 14175 MWD+1FR-AK-CA-SC(2, 5) 30,600.0 09.40 152.18 7,593.72 81.02 538 44211 1.59 81.05 6.50 15.81 44943 45.00 141.n MWD+IFR-AK-CALSC(2, 5) 30.70000 8948 152.18 7,594.62 8128 4.38 442.52 1.59 8131 8.50 1580 449.02 45.18 1410 MM+IFR-AK-CA-W(2, 5) 30,708.50 8848 152.18 7,594.70 81.30 -8.38 442.56 159 8133 8.50 15.91 44985 4520 141.80 MWD+IFRAI(-CP -SC (2, 5) 411112019 9:23'03AM Page 6 COMPASS 5000.14 Build 85D Company: Con=Phillips Alaska lnc_WNS Project: Western North Slope Site: CDS Alpine West Pad Well: Plan: CD5-98 (11 B) Wellbore: CD5-98L1 Design: CD5-98L1 WP04 ConocoPhiliips Error Ellipse Report Local Co-ordinate Reference: TVD Reference: MD Reference: North Reference: Survey Calculation Method: Output errors are at Database: Design Targets Target Name -hitlmiss target Dip Angle Dip Dir. TVD +N/ -S +E/ -W -Shape (1 (1) (usft) (usft) (usft) CD5-98Ll T01 Heel 122 0.00 0.00 7,44970 - plan hits target center -Circle (radius 100.00) CD5-981_1 T02 Toe 1224 0.00 0.00 7,594.70 - plan hits target center -Circle (radius 100.00) Casing Points Northing (usft) Well Plan: CD5-98 (11 B) - Slot 98 Plan D25 (d 74.70usft (D25) Plan D25 @ 74.70usft (D25) True Minimum Curvature 2.00 sigma OAKEDMPi Eastmg (usft) Latitude Longitude Measured Vertical Local Coordinates Casing Hole Depth Depth +E/ -W Diameter Diameter (usft) (usft) Name (in) (in) 159.80 159.80 20 20.000 48.000 2,296.67 2,189.70 10-3/4x13-1/2 10.750 13.500 13,821.00 7,449.77 7-5/8 x 11 7.625 11.000 30,708.50 7,594.70 4-112x6-1/2 4.500 6.500 Plan Annotations Measured Vertical Local Coordinates Depth Depth +N/ -S +E/ -W (usft) (usft) (usft) (usft) Comment 13,820.00 7,449.48 5,251.39 -5,282.87 KOP: 15.9°/100' DLS, -25" TF, for 12.8' 13,832.80 7,452.92 5,242.01 -5,274.87 Hold for 30' 13,862.80 7,460.52 5,220.06 -5,255.87 Start 4.88°/100' DLS, 5.430 TF, for 515.48' 14,378.28 7,479.56 4,826.95 4,929.42 Hold for 16.11' 14,394.39 7,476.65 4,814.55 -4,919.54 Start 4.88°/100'DLS, 135" TF, for 312.73' 14,707.12 7,449.70 4,554.43 -4,749.74 Hold for 16001.38' 30,708.50 7,594.70 -9,597.52 2,716.55 TD: 30708.5' MD, 7594.7' TVD Checked By: Approved By: Date: 411112019 923: 03AM Page 7 COMPASS 5000.14 Build 85D Pool Report 15:08, March O62019 CD5-98L1 r(LL(O[ vue n,f,,.,1 eIhfl wp04.1 [['YI,O,uIl4W19Y ,:,e Quarter ([°%116 Ye 1]]<I6Y (IgafiaNa.l[«LI Mile View CO�1 `p-, O9.( � 't W�1 `Q�SWQfi, Cp5'SAWV' `pS.gzW�Dy. 8%Ikvi dosO 1r1A� 7000 __, .A 11y 500 350C- C N 9P ] I 1 0- + I 0, �p5 O 3500 -350C- 0 O VJ li M1 Oyq 1fi H ' 1y M1 ASPS', s3 Gas M� G� M1P �Oy 9 -7000 Afip1 WP GO M1P ' �� W�2 C Ap0 Al M1fi 9b DoH y Gp5' 11 315P81 -10500-- _— _. __ —_ 5"`1 G� royg5 1��'� - �Ng9P -4�� 5.315 1 ty4 - y t5 �CDY313 hfi� -7000 -3500 0 3500 7000 10500 14000 -14000 -10500 West(-)/East(+) (3500 usft/in) 15:11, March N W19 CD5-981_1 wp04.1 Quarter Mile View ILLLLL IL 1/1111111/ U. 11 1(1 ILM IIH: «-. ^G 11'1° i i€ ..', m 05 Closest Wells g664 depth labels are 7000-- G0 6 , 7200'tvd to600'tvtl 6 CD5-92 plan next to CD5-98 3500- -CD5-25 actual next -to CD5-98 w 1A CD5-23 actual next to CD5-98 ]3. CD5-90 plan within QM j CD5-26 plan within QM CO CD5-27 plan within QM 3 6 3500 -- — _ — o w "Q� -7000 12 �Vr GID� 72 7 CUSs1$PB1 ]a 7 9 16 �ry6 rL�6 625,1 -10500 -- 7 1-, ]6 'COS21sCOyy1 Yp0 16. -14000 -10500 -7000 -3500 0 3500 7000 10500 14000 West( -)/East(+) (3500 usft/in) CD5-98L1wp04.1 Surface Location - —--------- - B. CPAI Coordinate Converter Datum:NAD83 Region: alaska C Latitude/Longitude recimal Degrees C UTM Zone:1 — r South C•' State Plane Zone: F --]-]Units us -Ft C Legal Description fNAD27 only) ❑ x Datum. INAD27 Region: alaska C Latitude/Longitude IDecimalDegrees C UTM Zone: True r South G State Plane Zone:F I Units: us -ft 3W C Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates:- ---- X: 1489610.96 X: 349577.818477796 Y: 15965672.43 Y: 5965926.46025775 ( Transform Quit I Help CD5-98L1w 04.1 Surface Location CPAI Coordinate Converter - ❑ x Datum: NAD83 Region: akska li C Latitude/Longitude IDecimalDegrees C UTM Zone: F— r South G State Plane Zone: F- --�-] Units: FUS ft C Legal Description [NAD27 only] ;-Starting Coordinates: X 1489610.96 Y: 15965672.43 Datum NAD27 Region: alaska C Latitude/Longitude IDecimalDegrees C UTM Zone: True r South C Slate Plane Zone: Units: us -R R Legal Desaiption (NAD27 only) Township: 011 N . Ranga 004 I` J Meridian U . $edion 1g FNL -281.11736 FEL 2401.6215 Transform -) 4uit Heb ;D5 -98L1 p04.1 Surface Casing M CPAI Coordinate Converter Datum: NAD83 Region: alaska • Latitude/Longitude Decimal Degrees • UTM Zone: r— r- South G State Plane Zone: [" :,:] Units: us -ft • Legal Description (NAD27 only) Starting Coordinates: X: 11489307.45 Y: 1596SO49.25 Datum FN—AD-27----,l Region: ,!asks f Latitude/Longilude IDecimalDegrees r UTM Zone: True r South C State Plane Zone: Units: us -ft r Legal Descripfion (NAD27 only) Ending Coordinates: X: 1349274.319720197 Y: I 5966303.29210046 r._—_.._.___...__.- ransform._. ..., quit Help CD5-98Liw 04.1 Surface Casin CPAI Coordinate Converter — ❑ X Datum: NA683 Region: alaska C Latitude/Longitude Decimal Degrees C UTM Zone: �`— r South C• State Plane Zone: F7-:1 Units: us -ft l- Legal Description (NAD27 only) Starting Coordinates: X 1489307.45 Y: 5%6049.25 Datum: FEWRegion: alaska r Latitucle/Longitude IDecimalDegrees C UTM Zone: True r South C State Plane Zone: 1" : Units: us -0 fi Legal Description (NAD27 ons ) Township: 011 FN—,l Range: pp4 [E-:,:] Meridian:LI . Section:7 FNL. 5190.3631 FEL � 2711.2086 ETransform _ QUt I Help M5-98L1wPO4.1 Kick-off Point TOW M CPAI Coordinate Converter From: Datum: INAD83 I Regions lalaska r LatitudelLongitude IDecimalDegrees • UTM Zone: I — r South G State Plane Zone: q . I Units: us -ft • Legal Description (NAD27 only) Datum INAD27 I Region:alaska r Latitude/Longitude IDecimalDegrees —� t' UTM Zone True r South R State Plane Zone: I" J Units: us -Ft C Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates: x: 1484435.02 X: 344402.023210079 Y: 15971028.47 N 5971282.70943582 lwp04.1 Kick-off Point 4 CPAI Coordinate Converter Datum: NAD83 3 Region jalaska r Latitude/Longitude Decimal Degrees (' UTM Zone: f— r South C State Plane Zone: Iq Unittt urft i Legal Descrphon (NAD27 only) Starting Coordinates: Y' 11484435.02 Y: 15971028.47 Transform Quit Help — ❑ x Datum: NAD27 Region: alaska • Latitude/Longitude Decimal Degrees f•UTM Zone True r South r' State Plane Zone: F-----3 Units: us ft G` Legal Description (NAD27 only) Legal Township: D71 N Range: 003 Meridian I" D Section: 12 FNL 311.08801 FEL � 2756.8657 '-- — -- quit Help P CD5-98L1wp04.1 Top of Production Alpine A Q CPA] Coordinate Converter — Datum: NAD83 Region: alaska • Latitude/Longitude IDecimal Degrees J r UTM Zone: I — r South G State Plane Zone: I' J Units: us-lt r Legal Desctiplion (NAD27 only) ❑ _ x Datum: INAD27 I Region: alaska r: Latitude/Longitude IDecimal Degrees f• UTM Zone: True r South • State Plane Zone: 1' � Units: us -ft • Legal Description (NAD27 only) Starting Coordinates: Ending Coordinates: X: 11484366.53 X: 344333.535757513 Y: 15971113.52 Y: 15971367.76290057 )�—�TmnsForm quit Help 1 Top of M CPAI Coordinate Converter Datum: NAD83 Region: alaska r Latitude/Longitude IDecimal Degrees J r UTM Zone: I — r South StatePlane Zone: 1' Units: us -ft i Legal De>cnplion INAD^c7 onlyj Starting Coordinates: Y, 11484366.53 Y: 5971113.52 A - ❑ x Datum: NAD27 Region: alaska C Latitude/Longitude IDecimal Degrees J f UTM Zone: True r South C Slate Plane Zone: 1' D Units: us -ft r Legal Description (NAD27 only) Township: 011 I"J Range: 003 I` J Meridian: U . Section:l2 FFD 227.46977 FEL 2827.0792 {� Transform _.! Quit Help 1WD04.1 TD Q CPAI Coordinate Converter Datum: NAD83 Region: alaska r Latitude/Longitude IDecimalDegrees J r- UTM Zone: F— r South G State Plane Zone: F--:-:1 Units: us -ft C' Legal Description (NAD27 only) Sterling Coordinates: ----- X: 1492134 Y: 15956023 Datum: NAD27 . Region: alaska r LatRude/Longitude IDecimalDegrees * UTM Zone: True r South C• State Plane Zone: F7:-:1 Units: us -Ft r Legal Description (NAD27 only) Ending Coordinates: X: 352100.489181218 Y: 5956276.88368823 r'--'----..-..._..-'---- 1...__.._... TranaForm _ Quit Help CD5-98L1w 04.1 TD CPAI Coordinate Converter - ❑ X Datum: NADg3 Region: alaska . C Latitude/Longitude IDecimal Degrees r UTM Zone:I— r South G State Plane Zone:q . Units: us -ft r Legal Description (NAD27 only) Starling Coordinates: X 1492134 Y: 5956023 Datum: NAD27 Region: alaska . • Latitude/Longitude IDecimalDegrees f UTM Zone: True r South {^ Stale Plane Zone: I' -7J Units: us -ft . C•' Legal Deecrlption (NAD27 only) Township: 011 � Ranga OOq E . Meridian: )" J Section: 20 FNL . 4599.4292 FEL 5002.7588 I r" --..._..__._-_.._.... Quit Help ( Transform REV I DATE I BY I CrAPP DESCRIPTION I REV DATE BY I CK I APP I DESCRIPTION 1 4/24/15 1 CZ I DB I C. A. 1 UPDATED PER K150003ACS 12 5/2/16 CZ I GD C. A. UPDATED PER K160003ACS ALPINE SATELLITE DEVELOPMENT LOCATION OF THIS SURVEY T12 cD-5 PAD Q 11N CDS # .r�`"`•� CD4 TO ALPINE ACCESS ROAD ,. CD N HrA�rr•.=� 0 v` m0 zD LL IT001 VICINITY MAP NOT TO SCALE LEGEND: O PROPOSED CONDUCTOR • EXISTING CONDUCTOR SECTION 7, T. 11 N., R. 4 E., U.M. SECTION 18, T. 11 N., R. 4 E., U.M. pP� CD-5 OF noo PAD pES�GN SNOV`DER ��Qao�,�s�1�N�x000�m 01`aj1 ��ON NN O- O� up�p T PLANT N N 0 NOTE: 15'4o 52" p O CONDUCTOR CD5-x14 WAS PLUGGED AND p ABANDONED APRIL 2016. cME m KUUKPIK m UMIAQ ALPINE SURVEY OFFICE PHONE-907-6704739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD-5 WELL CONDUCTORS Alaska, Inc. AS-BUILT LOCATIONS CADD FILE NO. DRAWING NO: PART: REV: 15-03-02-1 04/18/2015 1 CE-CD50-1025 1 1 OF 3 2 1 4/24/15 1 CZ I DB I C. A. 1 UPDATED PER K150003ACS 12 15/2/161 CZ I GD I C. A. I UPDATED PER K160003ACS 49.211 151' 13 20.820 287 2508 27.5 ALL CONDUCTORS ARE LOCATED IN PROTRACTED SEC. 18, T 11 N, R 4 E, U.M. WELL 'Y' 'X' LAT.(N) LONG.(W) SFNL INEIF LS GNO EXIST.PAD CD5-x99 5,965,666.90 1 489 591.67 70' 18 49.211 151' 13 20.820 287 2508 27.5 33.9 CD5-x01 5,965,661.64 1 489 572.44 70' 18 49.155 151' '1321.378 293 2489 27.6 34.1 CD5-x02 5,965,656.28 1 489 553.29 70' 18 49.099 151' 13 21.934 299 2470 28.1 34.1 CD5-x03 5,965,650.92 1 489 534.00 70' 18 49.042 151 13 22.493 305 2451 _f8_ _4 34.1 CD5-x04 5,965,645.24 1 489 514.77 70' 18 48.982 151' 13 23.051 _S1 �1 2432 26.6 34.2 CD5-x05 5,965,639.80 1 489 495.46 70' 18 48.925 151' 13 23.611 316 2412 28.1 34.3 CD5-x06 5,965,634.56 1 489 476.20 70' 18 48.870 151' 13 24.170 322 2393 27.7 34.3 CD5-x07 5,965,629.08 1 489 457.08 70' 18 48.812 151' '1324.724 328 2374 27.9 34.3 CD5-x08 5,965,623.88 1 489 437.69 70' 18 48.757 151' 13 25.287 334 2355 28.1 34.3 CD5-x09 5,965,618.27 1 489 418.53 70' 18 48.698 151' 13 25.842 340 2336 27.3 34.2 CD5-x10 5,965,613.12 1 489 399.13 70' `18 _Y51' 13 26.405 345 2317 28.1 34.1 CD5-x11 5,965,607.66 1 489 379.86 70' 18 48.586 151' 13 26.964 351 2297 27.9 34.1 CD5-x12 5,965,602.23 1 489 360.56 7o' 18 48.529 151' 13 27.524 357 2278 28.0 34.1 CD5-x13 5,965 596.59 1 489,341.43 70' 18 48.470 151' 13 28.079 363 2259 26.1 34.2 .,� i. 489,322.33 -79'!8-; 8.114- 95i= }3-z6-633- 3fr8- 3z40- 27.6 34.2- CD5-14X 5,965,589.94 1 489317.35 70' 18 48.400 151' 13 28.777 370 2235 27.5 33.8 CD5-x15 5,965,586.10 1 489 303.11 70' 18 48.359 151' 13 29.190 373 2221 26.8 34.2 CD5-x16 5,965,580.48 1 489,283.58 70' 18 48.300 151' 13 29.757 380 2202 27.6 34.0 CD5-x17 5,965,575.11 1489264.31 70' `18 151' 13 30.316 386 2183 27.7 34.0 CD5-x18 5 965 569.79 1,489,245.23 70' 18 48.187 151' 13 30.869 391 2164 27.7 33.9 CD5-x19 5,965,564.42 1 489 225.90 70' 18 48.131 151' 13 31.430 397 2144 28.0 33.9 CD5-x20 5,965,558.96 1 489 206.70 70' 18 48.073 151' 13 31.987 403 2125 1 25.8 33.8 CD5-x21 5,965,553.51 1 489 187.22 70' 18 48.016 151' 13 32.552 409 2106 27.8 33.8 CD5-x22 5,965,548.14 1 489 168.15 70' 18 47.959 151' 13 33.105 415 2087 27.7 33.7 CD5-x23 5,965,542.72 1,48 70' 18 47.902 _T51' 13 33.666 420 2068 26.4 33.7 CD5-x24 5,965.537.42 1.489.129.64 70' 18 _T7 84-6 151' 13 34.222 _T2 �6 2049 28.0 33.7 CD5-x25 5.965.532.01 1 489 110.28 70' 18 47.789 151' 13 34.783 432 2029 27.7 33.7 CD5-x26 5 965 526.59 1,489,091.09 70' 18 47.732 151' 13 35.340 438 2010 26.3 33.7 CD5-x27 5,965,521-20 1489071.88 70' 18 47.675 151' 13 35.897 444 1991 27.5 33.7 CD5-x28 5,965,515.81 1 489 052.48 70' 18 47.618 151' 13 36.460 449 1972 27.4 33.6 CD5-x29 5,965,510.40 1 489 033.34 70' 18 47.561 151' 13 37.015 455 1953 27.6 33.6 CD5-x30 5 965 504.97 70' 18 47.504 151' 13 37.575 461 1934 25.3t3M3653 965 499.57 1 489 994.73 70' 18 47.447 151' 13 38.135 467 1915 26.6CD5-x32 5 965 494.13 1 5.45 70' 18 47390 151' 13 38.694 473 189526.6CD5-x33 5 965 488.75 1 488 956.35 70' 18 47333 151' 13 39.248 478 1876 27.0 Should be 1,488,994.73 NOTES 1. COORDINATES SHOWN HEREON ARE ALASKA STATE PLANE, ZONE 4, NAD 83. 2. ELEVATIONS SHOWN ARE BRITISH PETROLEUM MEAN SEA LEVEL KUUKPIK (B.P.M.S.L.) U M I A Q 3. CONDUCTOR CD5-x14 WAS PLUGGED AND ABANDONED APRIL, 2016. ALPINE SURVEY OFFICE PHONE: 907-670.4739 ALPINE MODULE:CD50 UNIT: CD ConocoPhillips ALPINE PROJECT CD -5 WELL CONDUCTORS Alaska, Inc. AS -BUILT LOCATIONS CADD FILE N0. DRAWING N0: PART: REV: 15-03-02-1 04/18/2015 1 CE-CD50-1025 1 of 3 2 i ■ Tier 1: Standard • Intervals without issues noted for Tier 2 or 3 ■ Tier 2: Challenging Orientation • Drillingwithin 30°of horizontal inclination AND drilling within 300of magnetic East/West azimuth in extreme northern or southern locations ■ Tier 3: Critical Steering Driller's Target of 50' Radius or Less • Lease line constraint • Small Geologic Target ■ Failure of Major Risk Rule (Close Approach) • Defined during directional planning, based on the positional uncertainty • Theoretical intersection of the path of the well being planned with an offset well • If HSE risks are eliminated, the Tolerable Collision Risk assessment can be implemented ■ Tier 4: Single section containing both Tier 2 and Tier 3 challenges ■ Tier 1 (Standard): • Directional interval across which no special mitigations are needed ■ Tier 2 (Challenging Orientation): • Increase non-magnetic insulation of MWD tool in the BHA • Take rotational check shots and/or increase survey frequency at the start of a BHA run • Alter well directional plan, if feasible • Consider gyro surveys where feasible ■ Tier 3 (Critical Steering): • Increase survey frequency across critical interval • Increase correction frequency across critical interval • Take rotational check shots and/or increase survey frequency if the critical interval is at the start of a BHA run • Define escalation based on deviation from plan • Minor Risked close approach intervals with a high financial or scope risk should strongly consider the use of relevant mitigations ■ Tier 4 (Critical Steering & Challenging Orientation): • Consider all Tier 2 & 3 mitigations ei ]eCwoeoFhillips TRANSMITTAL LETTER CHECKLIST WELL NAME: G R (, C b 5— 9<� �_ I / PTD: 19 — 060 VDevelopment Service _ Exploratory _ Stratigraphic Test _ Non -Conventional FIELD: G 0 1 V t 1 1 P_ R l Vey ynl'OOL: Alpine. / Check Box for Appropriate Letter / Paragraphs to be Included in Transmittal Letter CHECK OPTIONS TEXT FOR APPROVAL LETTER MULTI The permit is for a new wellbore segment of existing well Permit LATERAL No.',19-05a9 , API No. 50 -J03 -'a080 3 L__--0/).� `// (If last two digits Production should continue to be reported as a function of the original in API number are API number stated above. between 60-69 In accordance with 20 AAC 25.005(f), all records, data and logs acquired for the pilot hole must be clearly differentiated in both well Pilot Hole name ( PH) and API number (50- - from records, data and logs acquired for well name on permit). The permit is approved subject to full compliance with 20 AAC 25.055. Approval to produce/inject is contingent upon issuance of a conservation Spacing Exception order approving a spacing exception. (Company Name) Operator assumes the liability of any protest to the spacing exception that may occur. All dry ditch sample sets submitted to the AOGCC must be in no greater Dry Ditch Sample than 30' sample intervals from below the permafrost or from where samples are first caught and 10' sample intervals through target zones. Please note the following special condition of this permit: production or production testing of coal bed methane is not allowed for Non -Conventional (name of well) until after (Company Name) has designed and Well implemented a water well testing program to provide baseline data on water quality and quantity. (Company Name) must contact the AOGCC to obtain advance approval of such water well testing program. Regulation 20 AAC 25.071(a) authorizes the AOGCC to specify types of J well logs to be nm. In addition to the well logging program proposed by (Company Name) in the attached application, the following well logs are also required for this well: Well Logging Requirements Per Statute AS 31.05.030(d)(2)(B) and Regulation 20 AAC 25.071, composite curves for well logs run must be submitted to the AOGCC within 90 days after completion, suspension or abandonment of this well. Revised 2/2015 Loepp, Victoria T (DOA) From: Marushack, Andy 1 <Andy.J.Marushack@conocophillips.com> Sent: Wednesday, May 1, 2019 7:59 AM To: Loepp, Victoria T (DOA) Subject: RE: [EXTERNAL]CRU CD5-98(PTD 219-059); CD5-98L1(PTD 219-060) Pressures Attachments: 2. C135-98 10-401.xis; 2. CD5-981-1 10-401.xis Follow Up Flag: Follow up Flag Status: Flagged Hello Victoria, Sorry about that. After discussing with our Reservoir Engineer, the latest max predictions for formation pressure are 3,700 psi. I have Updated the 10-401 applications and copied the calcs below. Please let me know if there is anything else I can do to help. Sincerely, Andy CD5-98 Casing Size (in) Csg Setting Depth MD/TVD(ft) Fracture Gradient(ppg) Pore pressure (psi) ASP Drilling (psi) 20 120/120 10.9 51 56 10.75 2,296/2,189 14.5 964 1,432 7.625 14,250/7,514 12.5 3,700 3,167 4.5 31,844/ 7,749 12.5 3,700 n/a 1. ASP CALCULATIONS Drilling below 20" conductor ASP = [(FG x 0.052) - 0.1] D _ [(10.9 x 0.052) - 0.1] x 120 = 56 psi OR ASP =FPP-(0.1 xD) = 977 - (0.1 x 2190') = 745 psi 2. Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) - 0.11 D _ [(14.5 x 0.052) - 0.1 ] x 2189' = 1432 psi OR ASP = FPP - (0.1 x D) - 3700 - (0.1 x 7514') = 2949 psi 3. Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) - 0.1 ] D _ [(12.5 x 0.052) - 0.1 ] x 7514 = 4132 psi OR ASP= FPP - (0.1 x D) -- 3700- (0.1 x 7749') = 2925 psi CDS -98 L3 Casing Size (in) Csg Setting Depth MD/VD(ft) Fracture Gradient(ppg) Pore pressure (psi) ASP Drilling (psi) 20 120/120 10.9 51 56 10.75 2,296 / 2,189 14.5 964 1,432 7.625 14,250/7,514 12.5 3,700 3,167 4.5 30,708/ 7,594 12.5 3,700 n/a 2. ASP CALCULATIONS 4, Drilling below 20" conductor ASP = [(FG x 0.052) — 0.1 ] D = [(10.9x0.052) -0.l] x 120= 56 psi OR ASP = FPP — (0.1 x D) = 977 — (0.1 x 2190') = 745 psi Drilling below 10-3/4" surface casing ASP = [(FG x 0.052) — 0.1] D _ [(14.5 x 0.052) — 0.11 x 2189' = 1432 psi OR ASP = FPP — (0.1 x D) = 3700 — (0.1 x 7514') = 2949 psi 6. Drilling below 7-5/8" intermediate casing ASP = [(FG x 0.052) — 0.1 ] D = [(12.5 x 0.052) — 0.11 x 7514 = 4132 psi OR ASP = FPP —(0.1 xD) = 3700— (0.1 x 7594') = 2940 psi From: Loepp, Victoria T (DOA) <victoria.loepp@alaska.gov> Sent: Tuesday, April 30, 2019 10:32 AM To: Marushack, Andy J <Andy.J.Marushack@conocophillips.com> Subject: [EXTERNAL]CRU CD5-98(PTD 219-059); CD5-98L1(PTD 219-060) Pressures Andy, k The pore pressures and MPSP on the 10-401 form versus the ASP calculations are inconsisteno¢. Please review and send me revised pressures or calculations. Thanx, Victoria Victoria Loepp Senior Petroleum Engineer State of Alaska Oil 8 Gas Conservation Commission 333 W. 7th Ave Anchorage, AK 99501 WELL PERMIT CHECKLIST Field 8 Pool COLVILLE RIVER, ALPINE OIL - 120100 Well Name: COLVILLE RIV UNIT CD5-98L1 Program DEV Well bore seg PTD#:2190600 Company CONOCOPHILLIPS ALASKA INC. Initial Class/Type DEV / PEND GeoArea 890 Unit 50360 On/Off Shore On Annular Disposal Administration 1 Permit fee attached. . . . . . . . . . ................ NA.... - 2 Lease number appropriate- - - - - - - - - - - - - - Yes - - - - - - - - - - - - - - - - - - 13 Unique well name and number Yes 4 Well located in a -defined pool.. - - - - - - - - - - - - - - - ------- .... - - Yes 5 Well located proper distance from drilling unit boundary- - - - - - - - - - - - -------- - Yes - - - - - - - - - - - - - - - - 6 Well located proper distance from other wells. - .... - - _ - - _ ... Yes - - - - - - 7 Sufficient acreage available in. drilling unit- - - - - - .... ...... _ _ _ - Yes 8 If deviated, is wellbore plat. included - - - - - - - - - - - - - - - - - - - - - -------- Yes - Directional. plan view and wellbore cross-section included.. - - - - 9 Operator only affected party ... ............. -----------. Yes-- 10 Operator has. appropriate bond in force - - -- - ---- - - - - - - - - - - - - - - - - - - Yes - - 11 Permitcan be issued without conservation order . . . . . . ...................... Yes Appr Date 12 Permit can be issued without administrative approval - _ - - Yes 13 Can permit be approved before 15 -day wait. - .. - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes ... _ .. ......... ... .... . DLB 4/16/2019 14 Well located within area and strata authorized byInjectionOrder # (put IO# [ncpmments).(For- NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 15 All wellswithin1/4mile area of review identified (For service well only)- - - ----- - - - - - - - NA_ 16 Pre -produced injector; duration of pre production less than -3 months (For service well only) .. NA............................................................. 17 Nonconven, gas conforms to AS31,05:030(L1•A).0,2.A-D) - - - - - - - -- - -- - - - - - - - - - NA_ 18 Conductor string.provided ___ _ _ _ _ _ _ _ _ _ _ _ - - NA. - - - - _ Conductor set for -CRU CD5.99- Engineering X19 Surface casing. proteots allknown_ USDWs - _ - ... ..... ......... _ - NA - - - - - - - - - - - - - - - - - - - 20 CMT vol adequate to circulate on conductor 8 surf_csg - - - - - - - - - - - - - - ------- NA - _ - _ - 167% excess planned for CRU-CD5-99- 21 CMT. vol, adequate to tie-in long string to surf csg...... - - - - - - - .... NA _ - - _ ........ .. - . .... .. - .. - 22 CMT -will cover all known productive horizons... . .......... . . . . . . . . No - _ - - _ Productiveintervalwill be completed with uncemented liner with pert pups - - - - - 23 Casing designs adequate for CJ. 6 &-permafrost- - - - - - - - - - - - - ------ - - - - - - Yes 24 Adequate tankage. or reserve pit - . . . ................. Yes - - - Rig has steel tanks; all waste to approved disposal well 25 If a re -drill, has a 10-403 for abandonment been approved _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____ NA 26 Adequate wellbore separation proposed . .. . ....... . . . - _ - - - - _ .. Yes - - - Anti -collision analysis complete; no major risk failures - - - - - - 27 If diverter required, does it meet regulations. - - - - - - - - - - - NA- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Appr Date 28 Drilling fluid program schematic & egaip list adequate- _ - - _ - - - - - _ - ...... Yes - - Max formation pressure is 3700 psig(9.5.ppg EMW);-will drill w/ 9.0710.8 ppg EMW VTL 5/1/2019 29 BOPEs, do they meet regulation - _ - - - - - ..... Yes 30 BOPE press rating appropriate; test to.(put psig in comments)_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes . MPSP is 2925 psig; will test 60Ps-to 3500psig.............. - - 31 Choke. manifold complies w/API_RP-53 (May 64)...... - - .. - - Yes 32 Work will occur without operation shutdown- - - - - - - - - - - - - - - - ........ - Yes - - - - - - - - - - - - - - - - - - - - - - - - 33 Is presence of H2S gas probable. _ . _ - - - No... ... . . 34 Mechanical condition of wells within AOR verified (For service well only) - - .... NA ..... . . . .. . ............. . . . . . . . . . . . . . . . . ................. . 35 Permitcan be issued w/o hydrogen sulfide measures _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Yes .. - .. H2S not encountered in offset wells.- However,. rig will be. equipped with operational sensors/alarms. Geology 36 Datapresentedon potential overpressure zones ............ ....... . . . . . Yes Appr Date 37 Seismic analysis of shallow gaszones- - - - - - - - - - - - - - - - -- - -------- - - - - NA - - - - - - - - - - - - - - - - - - - DLB 4/16/2019 38 Seabed condition survey.(if off -shore) . . . . . . . ..................... - - NA 139 Contact name/phone for weeklypfogress reports [exploratory only] - - - - - - ........ NA Geologic Date: Engineering Date Public Date Commissioner: Commis ioner: Commissioner 6141 el 0