Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout198-131Pages NOT Scanned in this Well History File XHVZE This page identifies those items that were not scanned during the initial scanning project. They are available in the original file and viewable by direct inspection. /~/- ]"~/ File Number of Well History File PAGES TO DELETE Complete RESCAN Color items - Pages: Grayscale, halftones, pictures, graphs, charts- Pages: ,~ Poor Quality Original- Pages: [] Other- Pages: DIGITAL DATA [] Diskettes, No. [] Other, No/Type OVERSIZED [] Logs of various kinds [] Other COMMENTS: Scanned by: Beverly Mildred Damtha well Date: [] TO RE-SCAN Notes: Re-Scanned by: Beverly Mildred Daretha Nathan Lowell Date: /si BP EXPLORATION, Alaska Date: 01-26-99 Trans# 90195 BADAMI LOG DATA Enclosed are the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166 Sw Rec Rec Date Company Comments Name Type Code B1-28 OH 20-Sep-98 SPERRY MWD, MD, ROP, NGP, DGR, EWR4- OTHER SERVICES DIR. DRILLING, MUDLOGGING B1-28 OH 20-Sep-98 SPERRY MWD, TVD, NGP, DGR, EWR4- OTHER SERV DIR DRILLING, MUDLOGGING B1-28L1 DISK 25-Aug-98 SPERRY MWD, MPT, GR, EWR4, ROP Please sign and return one copy of this Carla H. Mclntosh Petrotechnical Data Center LOG DATA AOGCC-1 blueline/1 sepia/1 disk Howard Oakland PETROFINA-1 blueline/1 sepia/1 disk Mike Engle DNR - 1 blueline/1 disk Tim Ryherd BP - - 1 blueline Dave Goodwin MB 7-2 BP- - 1 blueline Ken Lemley (distributed by Dave Goodwin) RECEIVED JAN 2_ 7 1999 Petrotechnical Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 BP EXPLORATION, Alaska Date: 01-20-99 Trans# 90170 BADAMI LOG DATA AND DISKS Enclosed are the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166 SwName RecType RecDate Company Code Comments B1-28 DISK 19-Sep-98 SPERRY MWD, MPT, GR, EWR4, ROP B1-28L1 OH 26-Aug-98 SPERRY MWD, MD, ROP, NGP, DGR, EWR4 B1-28L1 OH 26-Aug-98! SPERRY MWD, TVD, NGP, DGR, EWR4 B1-28L2 OH 09-Sep-98! SPERRY MWD, MD, ROP, NGP, DGR, EWR4 B1-28L2 OH 09-Sep-981 SPERRY MWD, TVD, NGP, DGR, EWR4 B1-28L2 DISK 08-Sep-98! SPERRY MWD, MPT, GR, EWR4, ROP Please sign and return one copy of this tran~sm~ Carla H. Mclntosh i~~/~~ Petrotechnical Data Center LOG DATA ' AOGCC-1 blueline/1 sepia/1 disk Howard Oakland PETROFINA-1 blueline/1 sepia/1 disk Mike Engle DNR - 1 blueline/1 disk Tim Ryherd BP - - 1 blueline Dave GOodwin MB 7-2 BP--1 correlation blueline Ken Lemley RECEIVED JAN 21 1999 Al~a 0il & Gas Cons. Commisaon Andlofa~ Petrotechnical Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 Performance Enquiry Report Operator BP Exploration Date 03:51, 18 Dec 98 Page The analysis is l¥om - 22:45, 17 Aug 98 - to - 22:45, 17 Aug 98 Programs in Result Table: B 1-28 Well Type Time From Time To Duration Description E.M.W.(equivalent mud weight) Hole Size MDR B1-28 Event 22:45, 17 Aug 98 22:45, 17 Aug 98 0 hr 0 min Obtained required level of integrity 14.0 6 Facility Datefrime 28 Jul 98 29 Jul 98 30 Jul 98 31 Jul 98 01 Aug 98 02 Aug 98 03 Aug 98 04 Aug 98 05 Aug 98 Badami CPF Progress Report Well B 1-28L 1 Rig Nabors 28E 21:00-06:00 06:00-06:00 06:00-08:30 08:30-09:00 09:00-12:45 12:45-13:00 13:00-13:15 13:15-14:00 14:00-22:15 22:15-23:15 23:15-06:00 06:00-06:00 06:00-23:15 23:15-00:00 00:00-01:15 01:15-02:15 02:15-02:45 02:45-05:15 05:15-05:30 05:30-05:45 05:45-06:00 06:00-14:30 14:30-16:30 16:30-17:30 17:30-19:30 19:30-20:30 20:30-06:00 06:00-17:30 17:30-18:00 18:00-21:00 21:00-22:15 22:15-01:00 01:00-01:30 01:30-02:45 02:45-04:00 04:00-05:00 05:00-06:00 06:00-19:45 19:45-20:45 20:45-21:30 21:30-21:45 21:45-22:15 22:15-23:45 23:45-03:00 03:00-05:00 05:00-06:00 06:00-06:30 06:30-06:45 06:45-13:30 13:30-14:00 14:00-15:30 15:30-17:15 17:15-17:45 17:45-19:45 Duration 9hr 24 hr 2-1/2 hr 1/2 hr 3-3/4 hr 1/4 hr 1/4 hr 3/4 hr 8-1/4 hr 1 hr 6-3/4 hr 24 hr 17-1/4 hr 3/4 hr 1-1/4 hr 1 hr 1/2 hr 2-1/2 hr 1/4 hr 1/4 hr 1/4 hr 8-1/2 hr 2 hr 1 hr 2 hr 1 hr 9-1/2 hr 11-1/2 hr 1/2 hr 3 hr 1-1/4 hr 2-3/4 hr 1/2 hr 1-1/4 hr 1-1/4 hr 1 hr 1 hr 13-3/4 hr 1 hr 3/4 hr 1/4 hr 1/2 hr 1-1/2 hr 3-1/4 hr 2 hr 1 hr 1/2 hr 1/4 hr 6-3/4 hr 1/2 hr 1-1/2 hr 1-3/4 hr 1/2 hr 2 hr Activity Rig moved 0.50 % Rig moved 100.00 % Fill pits with Water based mud Held safety meeting Drilled to 223.0 ft Circulated at 223.0 ft Laid down 124.0 ft of 5in OD drill pipe Made up BHA no. 1 Drilled to 554.0 ft Cleared Flowline Drilled to 800.0 ft Drilled to 2200.0 ft Drilled to 3225.0 ft Circulated at 3225.0 ft Pulled out of hole to 661.0 ft Pulled BHA Made up BHA no. 2 R.I.H. to 3180.0 ft Washed to 3225.0 ft Functioned downhole tools at 3225.0 ft Drilled to 3250.0 ft Drilled to 3414.0 ft Pulled out of hole to 213.0 ft Pulled BHA Made up BHA no. 3 R.I.H. to 3414.0 ft Drilled to 3750.0 ft Drilled to 4326.0 ft Serviced Mud shakers Drilled to 4548.0 ft Circulated at 4548.0 ft Pulled out of hole to 213.0 ft Pulled BHA Made up BHA no. 4 R.I.H. to 3216.0 ft R.I.H. to 4548.0 ft Drilled to 4590.0 ft Drilled to 5460.0 ft Circulated at 5460.0 ft Pulled out of hole to 4490.0 ft Functioned downhole tools at 4490.0 ft R.I.H. to 5460.0 ft Circulated at 5460.0 ft Pulled out of hole to 220.0 ft Pulled BHA Rigged up Casing handling equipment Rigged up Casing handling equipment Held safety meeting Ran Casing to 5444.0 ft (9-5/8in OD) Ran Casing on landing string to 5444.0 ft Circulated at 5444.0 ft Mixed and pumped slurry - 245.000 bbl Displaced slurry - 400.000 bbl Circulated at 2181.0 ft Page Date 1 17 December 98 Facility Date/Time 06 Aug 98 07 Aug 98 08 Aug 98 09 Aug 98 10 Aug 98 11 Aug 98 Badami CPF Progress Report Well B1-28L1 Rig Nabors 28E Page Date 19:45-20:00 20:00-23:15 23:15-23:45 23:45-00:45 00:45-02:00 02:00-04:30 04:30-05:00 05:00-06:00 06:00-09:00 09:00-12:00 12:00-13:00 13:00-14:00 14:00-16:00 16:00-20:30 20:30-21:00 21:00-00:00 00:00-00:15 00:15-01:15 01:15-04:00 04:00-04:45 04:45-05:15 05:15-06:00 06:00-07:30 07:30-08:00 08:00-08:45 08:45-12:00 12:00-12:15 12:15-12:30 12:30-13:00 13:00-06:00 06:00-06:45 06:45-14:30 14:30-16:00 16:00-17:00 17:00-17:30 17:30-18:00 18:00-18:30 18:30-06:00 06:00-10:00 10:00-10:30 10:30-00:15 00:15-01:15 01:15-02:30 02:30-03:30 03:30-06:00 06:00-01:00 01:00-03:30 03:30-06:00 06:00-08:45 08:45-10:30 10:30-12:00 12:00-16:00 16:00-16:30 16:30-06:00 Duration 1/4 hr 3-1/4 hr 1/2 hr 1 hr 1-1/4 hr 2-1/2 hr 1/2 hr lhr 3 hr 3 hr 1 hr 1 hr 2hr 4-1/2 hr 1/2 hr 3 hr 1/4 hr 1 hr 2-3/4 hr 3/4 hr 1/2 hr 3/4 hr 1-1/2 hr 1/2 hr 3/4 hr 3-1/4 hr 1/4 hr 1/4 hr 1/2 hr 17 hr 3/4 hr 7-3/4 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 1/2 hr 11-1/2 hr 4 hr 1/2 hr 13-3/4 hr 1 hr 1-1/4 hr 1 hr 2-1/2 hr 19 hr 2-1/2 hr 2-1/2 hr 2-3/4 hr 1-3/4 hr 1-1/2 hr 4 hr 1/2 hr 13-1/2 hr Activity Held safety meeting Mixed and pumped slurry - 1064.000 bbl Displaced slurry - 161.000 bbl Cleared Flowline Rigged down Cement head Removed Divertor Installed Casing head Installed BOP stack Rigged up HCR valve Rigged up Blind ram Rigged up Bell nipple Tested Choke manifold Installed BOP stack Tested BOP stack Installed B ore protector Made up BHA no. 5 Tested MWD - Via string Serviced Block line R.I.H. to 2179.0 ft R.I.H. to 3794.0 ft Circulated at 3794.0 ft R.I.H. to 5355.0 ft Circulated at 5355.0 ft Tested Casing - Via annulus and string Held drill (Kick (well kill)) Drilled installed equipment - Float shoe Drilled to 5480.0 ft Circulated at 5480.0 ft Tested Casing - Via annulus and string Drilled to 6940.0 ft Circulated at 6940.0 ft Drilled to 7405.0 ft Circulated at 7405.0 ft Pulled out of hole to 5416.0 ft R.I.H. to 7405.0 ft Drilled to 7414.0 ft Circulated at 7414.0 ft Drilled to 8200.0 ft Drilled to 8390.0 ft Circulated at 8390.0 ft Drilled to 9059.0 ft Circulated at 9059.0 ft Pulled out of hole to 7400.0 ft R.I.H. to 9059.0 ft Drilled to 9215.0 ft Drilled to 9996.0 ft Circulated at 9996.0 ft Pulled out of hole to 6200.0 ft Pulled out of hole to 648.0 ft Pulled BHA Made up BHA no. 6 R.I.H. to 9900.0 ft Reamed to 9996.0 ft Drilled to 10650.0 ft 2 17 December 98 Facility Badami CPF Progress Report Well B 1-28L1 Page Rig Nabors 28E Date 3 17 December 98 Date/Time 12 Aug 98 13 Aug 98 14 Aug 98 15 Aug 98 16 Aug 98 17 Aug 98 06:00-06:00 06:00-07:30 07:30-09:00 09:00-12:30 12:30-13:30 13:30-16:00 16:00-17:30 17:30-01:30 01:30-04:00 04:00-06:00 06:00-08:00 08:00-08:15 08:15-13:30 13:30-14:00 14:00-17:00 17:00-18:00 18:00-22:30 22:30-23:00 23:00-03:30 03:30-06:00 06:00-06:30 06:30-07:00 07:00-07:30 07:30-08:30 08:30-10:00 10:00-11:00 11:00-14:00 14:00-16:00 16:00-21:00 21:00-22:30 22:30-00:00 00:00-02:00 02:00-03:00 03:00-06:00 06:00-07:00 07:00-10:00 10:00-12:45 12:45-13:00 13:00-14:45 14:45-20:15 20:15-20:45 20:45-21:00 21:00-01:00 01:00-06:00 06:00-07:00 07:00-11:00 11:00-12:00 12:00-13:15 13:15-14:30 14:30-15:30 15:30-16:45 16:45-18:00 18:00-19:00 19:00-20:45 Duration 24 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr 1 hr 2-1/2 hr 1-1/2 hr 8 hr 2-1/2 hr 2 hr 2 hr 1/4 hr 5-1/4 hr 1/2 hr 3 hr 1 hr 4-1/2 hr 1/2 hr 4-1/2 hr 2-1/2 hr 1/2 hr 1/2 hr 1/2 hr 1 hr 1-1/2 hr 1 hr 3 hr 2 hr 5 hr 1-1/2 hr 1-1/2 hr 2 hr 1 hr 3 hr 1 hr 3 hr 2-3/4 hr 1/4 hr 1-3/4 hr 5-1/2 hr 1/2 hr 1/4 hr 4 hr 5 hr 1 hr 4 hr 1 hr 1-1/4 hr 1-1/4 hr 1 hr 1-1/4 hr 1-1/4 hr 1 hr 1-3/4 hr Activity Drilled to 11980.0 ft Drilled to 12055.0 ft Circulated at 12055.0 ft Pulled out of hole to 5445.0 ft Serviced Block line R.I.H. to 12055.0 ft Circulated at 12055.0 ft Laid down 11407.0 ft of 5in OD drill pipe Pulled BHA Retrieved B ore protector Rigged up Casing handling equipment Tested Pipe ram Ran Casing to 3000.0 ft (7in OD) Circulated at 3000.0 ft Ran Casing to 5422.0 ft (7in OD) Circulated at 5422.0 ft Ran Casing to 5422.0 ft (7in OD) Circulated at 8997.0 ft Ran Casing to 12035.0 ft (7in OD) Circulated at 12035.0 ft Circulated at 12035.0 ft Pumped Water based mud spacers - volume 53.000 bbl Mixed and pumped slurry - 41.000 bbl Displaced slurry - 443.000 bbl Wait on cement Rigged down Casing handling equipment Installed Seal assembly Rigged up Logging/braided cable equipment Conducted electric cable operations Rigged down Logging/braided cable equipment Repaired HCR valve Installed Kelly Installed BOP test plug assembly Rigged up Well control Repaired Blind ram Rigged up BOP stack Repaired Blind ram Tested Blind ram Repaired Blind ram Tested BOP stack Retrieved BOP test plug assembly Installed Bore protector Made up BHA no. 7 Singled in drill pipe to 6200.0 ft Circulated at 6200.0 ft Singled in drill pipe to 11840.0 ft Serviced Kelly Reamed to 11873.0 ft Circulated at 11873.0 ft Tested Casing Held drill (Kick (well kill)) Drilled cement to 11950.0 ft Drilled installed equipment - Float collar Drilled to 12075.0 ft Facility Date/Time 18 Aug 98 19 Aug 98 20 Aug 98 21 Aug 98 22 Aug 98 Badami CPF Progress Report Well B1-28L1 Rig Nabors 28E Page Date 20:45-22:00 22:00-22:45 22:45-03:00 03:00-04:30 04:30-06:00 06:00-09:30 09:30-10:30 10:30-12:00 12:00-12:45 12:45-17:30 17:30-06:00 06:00-09:30 09:30-10:00 10:00-12:00 12:00-13:00 13:00-13:15 13:15-13:30 13:30-13:45 13:45-14:00 14:00-17:00 17:00-17:15 17:15-19:00 19:00-21:00 21:00-02:30 02:30-03:30 03:30-04:30 04:30-05:30 05:30-06:00 06:00-06:15 06:15-06:45 06:45-08:30 08:30-13:00 13:00-13:15 13:15-15:00 15:00-16:45 16:45-17:45 17:45-18:15 18:15-18:30 18:30-19:15 19:15-19:30 19:30-20:45 20:45-21:00 21:00-23:30 23:30-00:00 00:00-06:00 06:00-15:30 15:30-16:00 16:00-06:00 06:00-13:45 13:45-14:45 14:45-15:00 15:00-17:00 17:00-17:15 17:15-18:30 Duration 1-1/4 hr 3/4 hr 4-1/4 hr 1-1/2 hr 1-1/2 hr 3-1/2 hr 1 hr 1-1/2 hr 3/4 hr 4-3/4 hr 12-1/2 hr 3-1/2 hr 1/2 hr 2 hr 1 hr 1/4 hr 1/4 hr 1/4 hr 1/4 hr 3 hr 1/4 hr 1-3/4 hr 2 hr 5-1/2 hr 1 hr 1 hr 1 hr 1/2 hr 1/4 hr 1/2 hr 1-3/4 hr 4-1/2 hr 1/4 hr 1-3/4 hr 1-3/4 hr 1 hr 1/2 hr 1/4 hr 3/4 hr 1/4 hr 1-1/4 hr 1/4 hr 2-1/2 hr 1/2 hr 6 hr 9-1/2 hr 1/2 hr 14 hr 7-3/4 hr 1 hr 1/4 hr 2 hr 1/4 hr 1-1/4 hr Activity Circulated at 12075.0 ft Performed formation integrity test Drilled to 12130.0 ft Functioned downhole tools at 12130.0 ft Pulled out of hole to 11000.0 ft Pulled out of hole to 190.0 ft (cont...) Pulled BHA Downloaded MWD tool Made up BHA no. 8 R.I.H. to 12130.0 ft Drilled to 12337.0 ft Drilled to 12384.0 ft (cont...) Circulated at 12384.0 ft Drilled to 12416.0 ft Circulated at 12416.0 ft Flow check Pulled out of hole to 11999.0 ft Flow check Circulated at 11999.0 ft Pulled out of hole to 648.0 ft Flow check Pulled BHA Made up BHA no. 8 R.I.H. to 11999.0 ft Serviced Block line R.I.H. to 12416.0 ft Functioned downhole tools at 12416.0 ft Circulated at 12416.0 ft Circulated at 12416.0 ft (cont...) Pulled out of hole to 11999.0 ft Functioned M.W.D. tool Pulled out of hole to 655.0 ft Flow check Pulled BHA Made up BHA no. 8 Functioned M.W.D. tool R.I.H. to 1607.0 ft Functioned M.W.D. tool R.I.H. to 4397.0 ft Functioned M.W.D. tool R.I.H. to 7309.0 ft Functioned M.W.D. tool R.I.H. to 12415.0 ft Took MWD survey at 12415.0 ft Drilled to 12644.0 ft Drilled to 12927.0 ft Circulated at 12927.0 ft Drilled to 13260.0 ft Drilled to 13453.0 ft Serviced Pistons Drilled to 13493.0 ft Circulated at 13493.0 ft Flow check Pulled out of hole to 12400.0 ft 4 17 December 98 Facility Date/Time 23 Aug 98 24 Aug 98 25 Aug 98 26 Aug 98 27 Aug 98 28 Aug 98 B adami CPF Progress Report Well B 1-28L1 Page Rig Nabors 28E Date 5 17 December 98 18:30-18:45 18:45-19:30 19:30-06:00 06:00-07:00 07:00-07:30 07:30-16:45 16:45-18:45 18:45-19:00 19:00-21:00 21:00-21:30 21:30-06:00 06:00-10:00 10:00-11:30 11:30-06:00 06:00-10:30 10:30-12:15 12:15-12:30 12:30-15:15 15:15-15:30 15:30-16:45 16:45-18:30 18:30-19:15 19:15-19:30 19:30-22:00 22:00-22:15 22:15-03:15 03:15-03:30 03:30-06:00 06:00-07:30 07:30-08:30 08:30-09:45 09:45-13:15 13:15-15:00 15:00-15:30 15:30-16:30 16:30-18:30 18:30-19:30 19:30-20:00 20:00-20:30 20:30-03:00 03:00-06:00 06:00-10:30 10:30-14:00 14:00-14:15 14:15-15:30 15:30-16:15 16:15-17:00 17:00-19:15 19:15-19:45 19:45-21:00 21:00-03:00 03:00-03:30 03:30-04:30 04:30-06:00 Duration 1/4 hr 3/4 hr 10-1/2 hr 1 hr 1/2 hr 9-1/4 hr 2 hr 1/4 hr 2 hr 1/2 hr 8-1/2 hr 4 hr 1-1/2 hr 18-1/2 hr 4-1/2 hr 1-3/4 hr 1/4 hr 2-3/4 hr 1/4 hr 1-1/4 hr 1-3/4 hr 3/4 hr 1/4 hr 2-1/2 hr 1/4 hr 5 hr 1/4 hr 2-1/2 hr 1-1/2 hr 1 hr 1-1/4 hr 3-1/2 hr 1-3/4 hr 1/2 hr lhr 2 hr 1 hr 1/2 hr 1/2 hr 6-1/2 hr 3 hr 4-1/2 hr 3-1/2 hr 1/4 hr 1-1/4 hr 3/4 hr 3/4 hr 2-1/4 hr 1/2 hr 1-1/4 hr 6 hr 1/2 hr 1 hr 1-1/2 hr Activity Flow check R.I.H. to 13493.0 ft Drilled to 13746.0 ft Drilled to 13789.0 ft Serviced Liner Drilled to 14067.0 ft Circulated at 14067.0 ft Flow check Pulled out of hole to 12040.0 ft Held drill (Kick while drilling) Circulated at 12040.0 ft Circulated at 12040.0 ft R.I.H. to 14060.0 ft Drilled to 14450.0 ft Drilled to 14553.0 ft Circulated at 14553.0 ft Flow check Pulled out of hole to 11999.0 ft Flow check R.I.H. to 14553.0 ft Circulated at 14553.0 ft Circulated at 14553.0 ft Flow check Pulled out of hole to 11999.0 ft Flow check Pulled out of hole to 655.0 ft Flow check Pulled BHA Installed Logging/braided cable equipment Conducted electric cable operations Serviced Formation logs Conducted electric cable operations Conducted electric cable operations Serviced Formation logs Conducted electric cable operations Serviced Formation logs Rigged down sub-surface equipment - Formation logs Installed Hanger plug Held safety meeting Tested BOP stack Rig waited · Materials Rig waited · Materials Installed Cable Held safety meeting Installed Logging/braided cable equipment Conducted electric cable operations Serviced Formation logs Conducted electric cable operations Held safety meeting Installed Formation logs R.I.H. to 11823.0 ft Held safety meeting Installed Formation logs Conducted electric cable operations Facility · Badami CPF Progress Report Well B1-28L1 Page 6 Rig Nabors 28E Date 17 December 98 Date/Time 29 Aug 98 30 Aug 98 06:00-06:15 06:15-09:15 09:15-10:45 10:45-11:30 11:30-14:30 14:30-16:00 16:00-17:00 17:00-18:00 18:00-22:30 22:30-00:00 00:00-00:15 00:15-00:45 00:45-01:45 01:45-02:00 02:00-06:00 06:00-07:30 07:30-08:30 08:30-09:00 09:00-09:30 09:30-11:30 11:30-12:15 12:15-12:45 12:45-13:15 13:15-13:45 13:45-14:30 14:30-15:30 15:30-17:00 17:00-18:30 18:30-21:30 2I :30-00:00 00:00-04:30 04:30-05:00 05:00-06:00 Duration 1/4 hr 3 hr 1-1/2 hr 3/4 hr 3 hr 1-1/2 hr 1 hr 1 hr 4- I/2 hr 1-1/2 hr 1/4 hr 1/2 hr 1 hr 1/4 hr 4 hr 1-1/2 hr 1 hr 1/2 hr 1/2 hr 2 hr 3/4 hr 1/2 hr 1/2 hr 1/2 hr 3/4 hr 1 hr 1-1/2 hr 1-1/2 hr 3 hr 2-1/2 hr 4-1/2 hr 1/2 hr 1 hr . - - Activity Conducted electric cable operations Ran logs on tubulars Ran logs on tubulars R.I.H. to 14543.0 ft Ran logs on tubulars Pulled out of hole to 11831.0 ft Removed Logging/braided cable equipment Serviced Block line Pulled out of hole to 120.0 ft Rigged down sub-surface equipment - Formation logs Held safety meeting Installed Casing handling equipment Ran Liner to 580.0 ft (4-1/2in OD) Installed Liner hanger Ran Liner in stands to 9260.0 ft Ran Liner to 14553.0 ft'(4-1/2in OD) Installed Other sub-surface equipment Functioned Liner hanger Pulled Drillpipe in stands to 13509.0 ft Laid down I474.0 ft of Drillpipe Functioned Liner hanger Singled in drill pipe to 13039.0 fi Ran Drillpipe in stands to 14548.0 ft Functioned Liner hanger Pulled Drillpipe in stands to 13039.0 ft Laid down 994.0 ft of 3-1/2in OD drill pipe Circulated at 11999.0 ft Laid down 1395.0 ft of 3-1/2in OD drill pipe Pulled Drillpipe in stands to 0.0 ft Made up BHA no. 10 R.I.H. to 12310.0 ft Functioned downhole tools at 12288.0 ft ~Dr!!!ed t° 123!0'0 fl? ~~~ ell compliance Report-- File on Left side of folder 198-131-0 BADAMI UNIT Roll #1: Start: Stop Roll #2: MD 14553 TVD 10816 Completion Date: B1-28L1 50- 029-22899-60 BP EXPLORATION (AL^SRA) nqC Start Stop 10/18/98 Completed Status: 1-OIL Current: Name Interval D 8849 1 SPERRY MPT/GR/EWR4 OH L COMBO GAS-MD 1 10815 OH L COMBO GAS-TVD 1 14553 OH L NGP/DGR/EWR4-MD FINAL 5462-14553 OH L NGP/DGR/EWR4-MD FINAL 5462-12309 OH L NGP/DGR/EWR4-TVD FINAL 4529-10816 OH L NGP/DGR/EWR4-TVD FINAL 4529-10738 OH R GYRO CONT MULTI GYRODATA CSNG 0-11700 CH R SRVY RPT SPERRY 11700-14553. OH Sent Received T/C/D 1/26/99 1/27/99 10/7/98 10/8/98 10/7/98 10/8/98 1/20/99 1/21/99 1/20/99 1/21/99 1/20/99 1/21/99 1/20/99 1/21/99 12/22/98 12/24/98 12/22/98 12/24/98 Daily Well Ops Was the well cored? yes no Comments: Are Dry Ditch Samples Required? y And Received? yes no Analysis Description Received? yes(~/ Sample Set # Wednesday, November 08, 2000 Page 1 of 1 r ~ ' STATE OF ALASKA --;~ ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR REOOMPLETION REPORT AND LOG HOLE #1 1. Status of Well Classification of Service Well [] Oil [] Gas [] Suspended [] Abandoned E~] Service 2. Name of Operator 7. Permit Number BP Exploration (Alaska)Inc. 98-131 3. Address 8. APl Number P.O. Box 196612, Anchorage, Alaska 99519-6612 50-029-22899-60 4. Location of well at surface ,- · - 9. Unit or Lease Name 7~~' Badami Unit 3858' NSL, 5266' WEL, SEC. 9, T9N, R20E, UM.' ' i.~-.,,,~.~. ,,,~ At top of productive interval ~ 3284' NSL, 902' EWL, SEC. 3, T9N, R20E, UM..-/""__' /~.~.~ Ii ~~~i 10. Well Number B 1 At total depth '~" J~.~.l 11. Field and Pool 3791' NSL, 1247' EWL, SEC. 3, T9N, R20E, UM ' ' ':';: ~;': ~-! Badami 5. Elevation in feet (indicate KB, DF, etc.) 16. Lease Designation and Serial No. Plan KBE = 55.62'I ADL365533 12. Date Spudded7/30/98 I 13' Date T'D' Reached I 14' Date C°mp" Susp" °r Aband'115' Water depth' if °ffsh°re 16' N°' °f C°mpleti°ns8/25/98 10/18/98¢' N/A MSL One 17. Total Depth (MD+~/D)I18. Plug Back ,Depth (MD+TVD) I19. Directional Survey 120. Depth where SSSV set 121. Thickness of Permafrost 14553' 10816 FTI 14553 10816 FTI [] Yes I--] No N/A MD . 1900' (Approx.) 22. Type Electric or Other Logs Run MWD, ZDENS, MAC-GR, Gyro, STAR 23. CASING, LINER AND CEMENTING RECORD CASING SE%I-lNG DEPTH HOLE SIZE WT. PER FT. GRADE TOP BOTTOM SIZE CEMENTING RECORD AMOUNT PULLED 20" 91.1 # H-40 37' 110' 24" 260 sx Arctic Set (Approx.) 9-5/8" 40# L-80 35' 5442' 12-1/4" 2022 sx PF 'E', 385 sx 'G' 7" 29# Pl10 33' 12034' 8-1/2" 205 sx Class 'G' 4-1/2" 12.6# L-80 13977' 14553' 6" Uncemented slotted liner 24. Perforations open to Production (MD+TVD of Top and 25. TUBING RECORD Bottom and interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 4-1/2" Slotted Liner N/A MD TVD MD TVD 13977' - 14553' 10315'- 10816' 26. AC~D, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 27. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) October 22, 1998I Flowing Date of Test Hours Tested PRODUCTION FOR OIL-DEL GAS-MCF WATER-DEL CHOKE SIZE I GAS-OIL RATIO TEST PERIOD I Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (CORR) Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Form 10-407 Rev. 07-01-80 Submit In Duplicate 29. Geologic Markers 30. Formation Tests Measured True Vertical Include interval tested, pressure data, all fluids Marker Name Depth Depth recovered and gravity, GOR, and time of each phase. Top Badami Sands K2 13435' 9886' Base Badami Sands F4 14139' 10451' Base Badami Sands 15 14398' 10677' 31. List of Attachments Summary of Daily Drilling Reports, Surveys 32. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed ~_~~ Mike E. Miller Title Badami Drilling Team Leader Date B1-28L1 98-131 Prepared By Name/Number: Carol Withey, 564-4114 Well Number Permit No. / Approval No. INSTRUCTIONS GENERAL: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska, ITEM 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. ITEM 5.' Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. ITEM 16 AND 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. ITEM 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). ITEM 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. ITEM 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-In, Other-explain. ITEM 28: If no cores taken, indicate 'none'. Form 10-407 Rev. 07-01-80 RECEIVED S£? O 8 1998 BPXA PDO B.P. EXPLORATION BADAMI FIELD, WELL NO. B~-2,L~ 0 R! 6INA L NORTH SLOPE, ALASKA Gyro Continuous Muitishot Survey Inside 7" CASING Survey date: 15 -AUGUST, 1998 Job number: AK0898GCE486 CONTENTS JOB NUMBER :AK0898GCE486 1. DISCUSSION , SURVEY CERTIFICATION SHEET 2. SURVEY DETAILS 3. INRUN SURVEY LISTING 4. QUALITY CONTROL 5. EQUIPMENT AND CHRONOLOGICAL REPORT DISCUSSION JOB NUMBER' AK0898GCE486 Tool 790 was run in WELL #B1-28L1 on ATLAS 5/16" wireline inside 7" CASING. The survey was completed without any problems. SURVEY CERTIFICATION SHEET JOB NUMBER: AK0898GCE486 The data for this survey and the calculations for this survey were obtained and performed by me according to standards and procedures as set forth by Gyrodata Limited, true and correct to the best of my knowledge. TOM STODDARD OPERATIONS ENGINEER The data and calculations for this survey have been checked by me and conform to the standards and procedures as set for[h by Gyrodata Limited. This report represents a directional survey of this well based on the original data obtained at the wellsite. Checked by :- JACK E. MAY OPERATIONS MANAGER SURVEY DETAILS JOB NUMBER: AK0898GCE486 CLIENT: B.P. EXPLORATION RIG: SCHLUMBERGER LOCATION: WELL: BADAMI FIELD, ALASKA B1-28L1 LATITUDE: 70.15 N LONGITUDE: 147.4 W SURVEY DATE: SURVEY TYPE : 15 -AUGUST, 1998 GYRO CONTINUOUS MULTISH©T DEPTH REFERENCE: ROTARY TABLE ELEVATION 55.1' MAX. SURVEY DEPTH: 11700' SURVEY TIED ONTO: N/A SURVEY INTERVAL: 0-11700' APl NUMBER: TARGET DIRECTION: 050-029-22899-60 51.33 GRID CORRECTION: N/A CALCULATION METHOD: MINIMUM CURVATURE SURVEYOR: TOM STODDARD QUALITY CONTROL REPORT JOB NUMBER: AK0898GCE486 TOOL NUMBER: 790 MAXIMUM GYRO TEMPERATURE: 75.46 C MAXIMUM AMBIENT TEMPERATURE: 54.46 C MAXIMUM INCLINATION: 62.02 AVERAGE AZIMUTH: 55.3 WIRELINE REZERO VALUE: 0.0 REZERO ERROR/K: N/A CALIBRATION USED FOR FIELD SURVEY: 2640 CALIBRATION USED FOR FINAL SURVEY: 2640 PRE JOB MASS BALANCE OFFSET CHECK: -.47 POST JOB MASS BALANCE OFFSET CHECK~: USED O.O/N/A CONTINUOUS CONDITION OF SHOCK WATCHES -.51 UPON ARRIVAL AT RIG: O.K. UPON COMPLETION OF SURVEY: O.K. UPON RETURN TO ATLAS O.K. BO-I-I'OM LINE COMPARISIONS M.D. INC AZIMUTH TVD NORTHING EASTING MWD 11659 38.19 50.85 FINAL SURVEY 11650 38.64 50.72 8590.0 3820 5400 8583.2 3756 5435 FUNCTION TEST JOB NUMBER: AK0898GCE486 5 Survey stations were collected at the measured depth shown below. The tables show the repeatability of the gyro tool in both inclination and azimuth at one measured depth. INCLINATION M.D. ft 1 2 3 4 5 2700 13.20 13.20 13.20 13.20 13.20 AZIMUTH M.D. ft 1 2 3 4 5 2700 54.13 54.17 53.92 54.00 54.02 EQUIPMENT REPORT JOB NUMBER: AK0898GCE486 DOWNHOLE ELECTRONICS SURFACE ELECTRONICS PRIMARY TOOL No. 790 GYRO SECTION DATA SECTION POWER SECTION BACKUP TOOL No. 783 GYRO SECTION DATA SECTION POWER SECTION A0162 C0111 C0083 A0147 C0089 C0086 COMPUTER POWER SUPPLY PRINTER INTERFACE COMPUTER POWER SUPPLY PRINTER INTERFACE A0433 A0085 A0079 A0143 A0349 A0107 A0029 A0055 WIRELINE COMPANY: CABLE SIZE: 5/16" ATLAS RUNNING GEAR 2.5" HOUSING W/ROLLERS AND 3" ECCENTRIC BAR TOTAL LENGTH OF TOOL: 23' MAXIMUM O.D.: 4.5 INCHES TOTAL WEIGHT OF TOOL: 320 POUNDS CHRONOLOGICAL REPORT JOB NUMBER: AK0898GCE486 FRIDAY, 8/14/98 07:00 11:00 13:00 15:00 21:00 TO SLOPE. ARRIVE ATLAS CHECK TOOLS TO BADAMI CHECK TOOL W/WlRELINE O.K. SATURDAY, 8/15/98 05:30 08:00 09:00 16:30 18:45 21:15 22:30 ALERTED SPOT UNIT MU TOOL. PICK LIP GYRO, RIH SURVEY TO t 1700'. SURVEY OUT CONTINUOUS. LD TOOL. BD TOOL. SUNDAY,8/I 6/98 01:00 PROCESS RESULTS.. 15:00 TO DEADHORSE 16:00 STANDBY FOR JOB AT POINT MAC A Gyro da t a D i r e c t i ona I Survey for B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, NORTH SLOPE, ALASKA Job Number: AK0898GCE486 Run Date: 15-Aug-98 15:30:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.150000 deg. N Sub-sea Correction from Vertical Reference: 55.1 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 51.333 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gyro d a t a D i r e c t i ona i Survey B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL DEPTH feet SUBSEA VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet 0.0 0.00 0.00 0.00 100.0 .12 167.64 .12 200.0 .23 171.41 .11 300.0 .20 142.12 .11 400.0 .32 140.04 .12 0.0 -55.1 0.0 0.0 0.0 100.0 44.9 -.0 .1 167.6 200.0 144.9 -.2 .4 169.5 300.0 244.9 -.3 .8 163.9 400.0 344.9 -.3 1.2 155.3 0.0 N 0.0 E .1 S .0 E .4 S .1 E .7 S .2 E 1.1 S .5 E 500.0 .79 159.29 .49 600.0 1.62 170.75 .87 700.0 2.08 173.85 .46 800.0 3.28 175.54 1.20 900.0 3.91 175.63 .64 500.0 600.0 699.9 799.8 899.6 444.9 -.5 2.2 154.6 1.9 S .9 E 544.9 -1.4 4.2 160.7 4.0 S 1.4 E 644.8 -3.1 7.4 165.8 7.2 S 1.8 E 744.7 -5.7 12.1 169.3 11.8 S 2.2 E 844.5 -9.2 18.3 171.5 18.1 S 2.7 E 1000.0 4.91 172.04 1.03 1100.0 6.32 171.30 1.42 1200.0 6.73 171.26 .41 1300.0 6.42 170.98 .31 1400.0 5.30 171.83 1.13 999.3 1098.8 1198.2 1297.5 1397.0 944.2 -13.3 26.0 172.1 1043.7 -18.2 35.8 172.0 1143.1 -23.9 47.1 171.8 1242.4 -29.6 58.6 171.7 1341.9 -34.7 68.8 171.6 25.7 S 3.6 E 35.4 S 5.0 E 46.6 S 6.7 E 58.0 S 8.5 E 68.1 S 10.0 E 1500.0 3.84 172.93 1.46 1600.0 3.63 171.56 .23 1700.0 3.09 166.52 .62 1800.0 2.35 165.65 .74 ].900.0 ]..65 168.32 .71 1496.7 1596.5 1696.3 1796.2 1896.1 1441.6 -38.8 76.8 171.7 1541.4 -42.1 83.3 171.7 1641.2 -44.9 89.1 171.6 1741.1 -46.9 93.9 171.3 1841.0 -48.4 97.3 171.1 76.0 S 11.1 82.4 S 12 . 0 88.2 S 13.1 92.8 S 14.2 96.2 S 15.0 2000.0 ]..31 169.39 .35 2100.0 .80 161.96 .52 2200.0' .69 131.92 .40 2300.0 1.07 95.68 .65 2400.0 4.73 58.42 3.93 1996.1 2096.1 2196.1 2296.0 2395.9 1941.0 -49.6 99.9 171.1 2041.0 -50.4 101.7 171.0 2141.0 -50.5 102.9 170.7 2240.9 -49.7 103.6 170.0 2340.8 -45.0 102.5 167.4 98.7 S 15.5 E ].00.5 S 15.9 E 101.6 S 16.6 E 102.1 S 18.0 E 100.0 S 22.4 E A Gy r o d a t a D i r e c t i o n a i S u rve y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page 2 MEASURED DEPTH feet I N C L AZIMUTH deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 500.0 600.0 700.0 750.0 800.0 7.42 57.95 10.30 60.88 13.20 53.95 15.53 51.16 17.84 52.47 2.69 2495.3 2440.2 -34.5 99.5 161.6 2.92 2594.1 2539.0 -19.2 97.5 152.7 3.22 2692.0 2636.9 1.0 97.6 140.8 4.86 2740.5 2685.4 13.4 98.7 133.5 4.69 2788.4 2733.3 27.7 101.8 125.5 94.4 S 31.4 E 86.6 S 44.7 E 75.6 S 61.7 E ,' 68.0 S 71.5 E 59.1 S 82.8 E 850.0 9OO.O 950.0 000.0 050.0 20.73 54.71~ 23.50 58.76 24.86 60.77 26.00 61.97 27.19 62.42 5.96 2835.6 2780.5 44.2 108.1 117.2 6.32 2881.9 2826.8 62.9 118.5 109.3 3.19 2927.5 2872.4 83.2 132.7 102.5 2.49 2972.6 2917.5 104.3 149.6 97.1 2.42 3017.3 2962.2 126.3 168.4 92.7 49.4 S 96.1 E 39.1 S 111.9 E 28.8 S 129.6 E 18.5 S 148.4 E 8.1 S 168.2 E 100.0 150.0 200.0 250.0 300.0 28.49 63 .41 29.50 64.35 29.71 64.54 30.39 63 .52 31.98 63.12 2.76 3061.6 3006.5 149.2 189.0 89.2 2.22 3105.3 3050.2 172.9 211.2 86.4 · 45 3148.8 3093.7 196.9 234.3 84.1 1.70 3192.0 3136.9 221.3 257.9 82.2 3.22 3234.8 3179.7 246.7 282.6 80.5 2.6 N 189.0 E 13.2 N 210.8 E 23.9 N 233.1 E 34.9 N 255.6 E 46.5 N 278.7 E 350.0 400.0 450.0 500.0 550.0 32.98 63.32 34.32 62.86 35.97 60.98 36.91 58.10 38.64 54.82 2.00 3277.0 3221.9 272.9 308.3 79.0 2.73 3318.6 3263.5 300.1 335.0 77.7 3.95 3359.5 3304.4 328.3 362.8 76.5 3.91 3399.7 3344.6 357.7 391.3 75.2 5.3]. 3439.2 3384.1 388.2 420.4 73.9 58.6 N 302.7 E ., 71.1 N 327.4 E ~ 84.7 N 352.8 E 99.7 N 378.4 E ].16.7 N 403.9 E 3600.0 3650.0 3700.0 3750.0 3800.0 39.93 54.18 42.43 54.44 43.83 54.69 46.89 55.04 48.34 55.90 2.70 3477.9 3422.8 419.8 450.4 72.5 5.01 3515.6 3460.5 452.7 481.7 71.3 2.82 3552.1 3497.0 486.9 514.6 70.2 6.15 3587.2 3532.1 522.4 549.0 69.2 3.16 3620.9 3565.8 559.2 584.9 68.4 135.1 N 429.6 E 154.3 N 456 .4 E 174.1 N 484.2 E 194.6 N 513.3 E 215.5 N 543 .8 E A Gy r o d a t a D i r e c t i o n a i S u rve y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 3850.0 49.84 57.40 3900.0 49.74 58.04 3950.0 51.04 57.99 4000.0 52.91 57.15 4050.0 55.74 55.65 3.76 3653.6 3598.5 596.8 621.9 67.7 .99 3685.9 3630.8 634.8 659.6 67.1 2.59 3717.8 3662.7 673.0 697.6 66.6 3.98 3748.6 3693.5 712.2 736.6 66.1 6.16 3777.7 3722.6 752.6 776.6 65.6 236.3 N 575.3 E 256.6 N 607.6 E 277.1 N 640.3 E 298.2 N 673.5 E 320.7 N 707.3 E 4100.0 56.55 55.59 4150.0 56.50 55.29 4200.0 57.44 53.69 4250.0 57.48 52.71 4300.0 57.19 51.58 1.61 3805.6 3750.5 794.0 817.5 65.1 .51 3833.2 3778.1 835.6 858.7 64.6 3.29 3860.4 3805.3 877.5 900.0 64.2 1.65 3887.3 3832.2 919.6 941.4 63.7 1.99 3914.3 3859.2 961.7 982.7 63.2 344.1 N 741.6 367.8 N 775.9 392.1 N 810.1 417.4 N 843.8 443.2 N 877.1 4350.0 56.57 51.17 4400.0 57.44 51.30 4450.0 57.14 51.24 4500.0 56.54 50.94 4550.0 55.93 51.59 1.42 3941.6 3886.5 1003.6 1023.7 62.7 1.76 3968.9 3913.8 1045.5 1064.8 62.3 .61 3995.9 3940.8 1087.6 1106.1 61.8 1.30 4023.2 3968.1 1129.4 1147.3 61.5 1.63 4051.0 3995.9 1171.0 1188.2 61.1 469.3 N 909.8 E 495.6 N 942.5 E 521.9 N 975.3 E 548.2 N 1007.9 E 574.2 N 1040.3 E 4600.0 55.32 52.46 4650.0 55.31 52.99 4700.0 55.78 53.99 4750.0 55.98 54.24 4800.0 56.63 55.01 1.88 4079.3 4024.2 1212.3 1229.0 60.8 .88 4107.7 4052.6 1253.4 1269.7 60.5 1.89 4136.0 4080.9 1294.6 1310.6 60.3 .58 4164.0 4108.9 1335.9 1351.8 60.1 1.83 4191.8 4136.7 1377.4 1393.2 60.0 599.6 N 1072.8 E 624.5 N 1105.5 E 649.0 N 1138.7 E 673.3 N 1172.2 E 697.4 N 1206.1 E 4850.0 57.93 55.80 4900.0 60.24 56.86 4950.0 60.94 57.28 5000.0 61.20 57.26 5050.0 61.67 57.29 2.92 4218.8 4163.7 1419.4 1435.2 59.8 4.97 4244.5 4189.4 1462.1 1478.0 59.7 1.57 4269.0 4213.9 1505.5 1521.5 59.7 .51 4293.2 4238.1 1549.0 1565.2 59.6 .95 4317.1 4262.0 1592.7 1609.1 59.5 721.3 N 1240.7 E 745.0 N 1276.4 E 768.7 N 1313.0 E 792.4 N 1349.8 E 816.1 N 1386.8 E A Gy r o d a t a D i r e c t i o n a i S u rv e y B.P. EXPLOP~ATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 5100.0 5150.0 5200.0 5250.0 5300.0 61.86 57.34 59.37 57.24 57.76 57.20 57.97 57.49 58.30 57.66 .39 4340.8 4285.7 1636.5 1653.1 59.5 .97 4365.3 4310.2 1679.8 1696.6 59.4 .22 4391.4 4336.3 1722.2 1739.3 59.4 .64 4418.0 4362.9 1764.4 1781.6 59.3 .72 4444.4 4389.3 1806.6 1824.0 59.3 839.9 N 1423.8 E 863.4 N 1460.5 E 886.5 N 1496.4 E 909.4 N 1532.0 E 932.1 N 1567.9 E 5350.0 5400.0 5450.0 5500.0 5550.0 56.56 57.38 56.37 57.48 54.50 57.70 54.29 57.61 54.42 57.45 .51 4471.3 4416.2 1848.5 1866.1 59.2 .41 4498.9 4443.8 1889.9 1907.8 59.2 .75 4527.3 4472.2 1930.8 1948.9 59.2 .45 4556.4 4501.3 1971.2 1989.6 59.1 .37 4585.6 4530.5 2011.6 2030.2 59.1 954.8 N 1603.4 977.2 N 1638.5 999.3 N 1673.3 1021.0 N 1707.6 1042.8 N 1741.9 5600.0 5650.0 5700.0 5750.O 5800.0 54.52 57.31 54.12 57.18 54.22 57.07 54.25 57.16 54.41 57.23 .30 4614.6 4559.5 2052.1 2070.9 59.1 .83 4643.8 4588.7 2092.5 2111.5 59.0 .27 4673.0 4617.9 2132.8 2152.0 59.0 .15 4702.3 4647.2 2173.2 2192.5 59.0 .34 4731.4 4676.3 2213.6 2233.1 58.9 1064.8 N 1776.2 1086.7 N 1810.3 1108.8 N 1844.4 1130.8 N 1878.4 1152.8 N 1912.6 5850.0 5900.0 5950.0 6000.0 6050.0 54.48 57.01 54.25 56.91 54.74 57.45 54.84 57.72 55.16 57.36 .39 4760.5 4705.4 2254.1 2273.8 58.9 .48 4789.6 4734.5 2294.5 2314.4 58.9 .32 4818.7 4763.6 2335.0 2355.1 58.8 .48 4847.5 4792.4 2375.6 2395.9 58.8 .88 4876.2 4821.1 2416.3 2436.9 58.8 1174.9 N 1946.8 E 1197.0 N 1980.8 E 1219.1 N 2015.0 E 1241.0 N 2049.5 E 1263.0 N 2084.1 E 6100.0 6150.0 6200.0 6250.0 6300.0 55.37 57.13 55.24 56.72 55.16 56.38 55.21 56.09 55.53 55.30 . 57 4904 . 7 4849 . 6 2457 . 2 2478 . 0 58 . 8 . 72 4933 . 1 4878 . 0 2498 . 1 2519 . 0 58 . 7 . 58 4961 . 7 4906 . 6 2539 . 0 2560 . 1 58 . 7 .49 4990.2 4935.1 2579.9 2601.1 58.7 1 . 45 5018 . 6 4963 . 5 2620 . 9 2642 . 2 58 . 6 1285.2 N 2118.6 E 1307.6 N 2153.1 E 1330.3 N 2187.3 E 1353.1 N 2221.5 E 1376.3 N 2255.4 E A Gy r o d a t a D i r e c t i o n a i S u rv e y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 6350.0 55.84 54.50 6400.0 56.73 54.23 6450.0 57.58 53.85 6500.0 56.53 53.93 6550.0 56.10 53.53 1.46 5046.8 4991.7 '2662.1 2683.4 58.6 1.83 5074.6 5019.5 2703.7 2724.9 58.5 1.82 5101.7 5046.6 2745.6 2766.7 58.4 2.11 5128.9 5073.8 2787.5 2808.6 58.4 1.09 5156.6 5101.5 2829.1 2850.0 58.3 1400.0 N 2289.2 E 1424.2 N 2323.0 E 1448.9 N 2357.0 E 1473.6 N 2390.9 E 1498.3 N 2424.5 E 6600.0 54.54 53.56 6650.0 53.43 53.07 6700.0 54.00 52.36 6750.0 54.34 51.51 6800.0 54.45 50.72 3.11 5185.1 5130.0 2870.2 2891.0 58.2 2.36 5214.5 5159.4 2910.6 2931.3 58.2 1.61 5244.0 5188.9 2950.9 2971.4 58.1 1.54 5273.3 5218.2 2991.4 3011.8 58.0 1.30 5302.4 5247.3 3032.1 3052.1 57.9 1522.7 N 2457.5 E 1546.8 N 2490.0 E 1571.3 N 2522.0 E 1596.3 N 2553.9 E 1621.8 N 2585.6 E 6850.0 54.12 49.97 6900.0 52.90 50.81 6950.0 52.31 51.14 7000.0 51.90 52.53 7050.0 51.86 53.14 1.39 5331.6 5276.5 3072.7 3092.4 57.8 2.77 5361.3 5306.2 3112.9 3132.2 57.7 1.30 5391.7 5336.6 3152.6 3171.7 57.6 2.35 5422.4 5367.3 3192.0 3210.9 57.6 .97 5453.3 5398.2 3231.4 3250.1 57.5 1647.7 N 2616.8 E 1673.3 N 2647.8 E 1698.3 N 2678.7 E 1722.7 N 2709.7 E 1746.5 N 2741.0 E 7100.0 51.44 54.21 7150.0 51.34 54.80 7200.0 50.97 56.02 7250.0 50.15 56.25 7300.0 49.50 57.62 1.87 5484.3 5429.2 3270.5 3289.3 57.5 .95 5515.5 5460.4 3309.5 3328.3 57.4 2.02 5546.9 5491.8 3348.4 3367.2 57.4 1.69 5578.6 5523.5 3386.9 3405.8 57.4 2.46 5610.9 5555.8 3424.9 3444.0 57.4 1769.7 N 2772.6 E 1792.4 N '2804.4 E 1814.5 N 2836.5 E 1836.0 N 2868.6 E 1856.9 N 2900.6 E 7350.0 49.47 58.43 7400.0 49.26 59.45 7450.0 49.11 59.11 7500.0 48.67 58.28 7550.0 48.69 57.70 1.23 5643.4 5588.3 3462.6 3482.0 57.4 1.6]. 5675.9 5620.8 3500.2 3519.9 57.4 .61 5708.6 5653.5 3537.7 3557.8 57.4 1.53 5741.5 5686.4 3575.1 3595.4 57.4 .87 5774.5 5719.4 3612.4 3633.0 57.4 1877.0 N 2932.8 E 1896.6 N 2965.3 E 1915.9 N 2997.8 E 1935.5 N 3030.0 E 1955.4 N 3061.9 E A Gy r o d a t a D i r e c t i o n a i S u rve y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED DEPTH feet I N C L AZIMUTH deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 7600.0 48.16 56.91 7650.0 47.90 56.22 7700.0 47.90 55.79 7750.0 47.64 56.46 7800.0 47.49 56.08 1.60 5807.7 5752.6 3649.6 3670.4 57.4 1.15 5841.1 5786.0 3686.6 3707.6 57.4 .63 5874.6 5819.5 3723.6 3744.6 57.4 1.12 5908.3 5853.2 3760.5 3781.7 57.4 .63 5942.0 5886.9 3797.2 3818.5 57.4 1975.6 N 3093.4 E 1996.1 N 3124.4 E 2016.8 N 3155.1 E 2037.4 N 3185.9 E 2057.9 N 3216.6 E 7850.0 47.31 56.92 7900.0 47.66 56.71 7950.0 47.38 56.04 8000.0 47.39 55.34 8050.0 47.88 55.92 1.28 5975.8 5920.7 3833.9 3855.3 57.4 .77 6009.6 5954.5 3870.6 3892.2 57.4 1.14 6043.4 5988.3 3907.3 3929.1 57.4 1.02 6077.2 6022.1 3944.0 3965.9 57.4 1.30 6110.9 6055.8 3980.8 4002.8 57.3 2078.2 N 3247.2 E 2098.4 N 3278.1 E 2118.8 N 3308.8 E 2139.6 N 3339.2 E 2160.4 N 3369.7 E 8100.0 48.16 55.86 8150.0 48.89 55.92 8200.0 48.39 55.10 8250.0 48.07 54.13 8300.0 48.12 53.44 .58 6144.4 6089.3 4017.9 4039.9 57.3 1.46 6177.5 6122.4 4055.2 4077.4 57.3 1.59 6210.5 6155.4 4092.7 4114.9 57.3 1.58 6243.8 6188.7 4129.9 4152.1 57.3 1.03 6277.2 6222.1 4167.1 4189.3 57.2 2181.3 N 3400.5 E 2202.3 N 3431.5 E 2223.5 N 3462.4 E 2245.1 N 3492.8 E 2267.1 N 3522.8 E 8350.0 48.39 53.53 8400.0 48.44 53.62 8450.0 48.36 54.02 8500.0 48.57 54.23 8550.0 48.51 54.41 .56 6310.5 6255.4 4204.3 4226.5 57.2 .18 6343.7 6288.6 4241.7 4263.8 57.2 .63 6376.9 6321.8 4279.1 4301.2 5'7.1 .53 6410.1 6355.0 4316.5 4338.5 57.1 .28 6443.2 6388.1 4353.9 4376.0 57.1 2289.3 N 3552.8 E 2311.5 N 3582.9 E 2333.6 N 3613.1 E 2355.5 N 3643.4 E 2377.4 N 3673.9 E 8600.0 48.94 54.85 8650.0 48.97 55.22 8700.0 48.53 54.31 8750.0 48.13 53.63 8800.0 47.67 52.78 1.09 6476.2 6421.1 4391.4 4413.5 57.1 · 55 6509.0 6453.9 4429.0 4451.2 57.1 1.62 6542.0 6486.9 4466.5 4488.8 57.0 1.29 6575.2 6520.1 4503.9 4526.1 57.0 1.55 6608.7 6553.6 4540.9 4563.1 57.0 2399.1 N 3704.5 E 2420.7 N 3735.4 E 2442.4 N 3766.1 E 2464.4 N 3796.3 E 2486.6 N 3826.0 E A Gyro d a t a D i r e c t i on a i Survey B.P. EXPLOP~ATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 8850.0 47.38 52.07 8900.0 46.97 52.86 8950.0 46.99 53.07 9000.0 46.97 53.25 9050.0 46.88 53.07 1.21 6642.5 6587.4 4577.8 4599.8 56.9 1.42 6676.5 6621.4 4614.5 4636.4 56.9 .30 6710.6 6655.5 4651.0 4672.9 56.9 .26 6744.7 6689.6 4687.5 4709.3 56.8 .31 6778.8 6723.7 4724.0 4745.8 56.8 2509.1 N 3855.2 E 2531.4 N 3884.3 E 2553.5 N 3913.5 E 2575.4 N 3942.8 E 2597.3 N 3972.0 E 9100.0 46.95 52.59 9150.0 46.78 51.95 9200.0 46.90 52.17 9250.0 46.55 51.70 9300.0 46.69 52.21 .73 6813.0 6757.9 4760.6 4782.2 56.8 .98 6847.2 6792.1 4797.0 4818.6 56.8 .40 6881.4 6826.3 4833.5 4854.9 56.7 .98 6915.7 6860.6 4869.9 4891.2 56.7 .79 6950.0 6894.9 4906.2 4927.4 56.6 2619.3 N 4001.1 E 2641.7 N 4029.9 E 2664.1 N 4058.7 E 2686.5 N 4087.4 E 2708.9 N 4116.0 E 9350.0 46.68 51.41 9400.0 47.54 52.21 9450.0 47.46 52.87 9500.0 47.67 52.99 9550.0 47.86 52.24 1.16 6984.3 6929.2 4942.6 4963.7 56.6 2.07 7018.3 6963.2 4979.3 5000.2 56.6 1.00 7052.1 6997.0 5016.1 5037.0 56.5 .47 7085.9 7030.8 5053.0 5073.8 56.5 1.17 7119.5 7064.4 5090.0 5110.7 56.5 2731.4 N 4144.6 E 2754.1 N 4173.4 E 2776.5 N 4202.6 E 2798.7 N 4232.1 E 2821.2 N 4261.5 E 9600.0 48.17 51.90 9650.0 48.52 50.94 9700.0 49.05 51.43 9750.0 49.49 51.90 9800.0 49.71 52.11 .79 7152.9 7097.8 5127.2 5147.8 56.5 1.60 7186.1 7131.0 5164.5 5185.0 56.4 1.30 7219.1 7164.0 5202.1 5222.5 56.4 1.12 7251.7 7196.6 5240.0 5260.2 56.4 .56 7284.1 7229.0 5278.1 5298.2 56.3 2844.0 N 4290.8 E 2867.3 N 4320.0 E 2890.9 N 4349.3 E 2914.4 N 4379.0 E 2937.9 N 4409.1 E 9850.0 49.76 51.79 9900.0 49.94 51.16 9950.0 49.89 51.70 10000.0 49.98 51.97 ].0050.0 49.46 51.79 .49 7316.4 7261.3 5316.3 5336.2 56.3 1.04 7348.7 7293.6 5354.5 5374.3 56.3 .84 7380.9 7325.8 5392.7 5412.4 56.2 .45 7413.1 7358.0 5431.0 5450.6 56.2 1.08 7445.4 7390.3 5469.1 5488.6 56.2 2961.4 N 4439.]. E 2985.2 N 4469.0 E 3009.0 N 4498.9 E 3032.7 N 4529.0 E 3056.2 N 4559.0 E A Gyro d a t a D i r e c t i o n a i S u rve y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 10100.0 49.45 51.60 10150.0 49.31 51.29 10200.0 49.27 51.13 10250.0 49.23 50.82 10300.0 49.00 50.64 .29 7477.9 7422.8 5507.1 5526.5 56.1 .54 7510.4 7455.3 5545.1 5564.3 56.1 .27 7543.0 7487.9 5583.0 5602.1 56.1 .47 7575.7 7520.6 5620.9 5639.8 56.0 .54 7608.4 7553.3 5658.7 5677.5 56.0 3079.8 N 4588.8 3103.4 N 4618.5 3127.2 N 4648.0 3151.0 N 4677.5 3174.9 N 4706.7 10350.0 48.53 50.92 10400.0 48.58 50.75 10450.0 48.09 50.95 10500.0 47.79 50.52 10550.0 47.01 51.22 .04 7641.4 7586.3 5696.3 5714.9 56.0 .27 7674.5 7619.4 5733.7 5752.2 55.9 .02 7707.7 7652.6 5771.1 5789.4 55.9 .86 7741.2 7686.1 5808.2 5826.4 55.9 .87 7775.0 7719.9 5845.0 5863.1 55.8 3198.7 N 3222.4 N 3246.0 N 3269.5 N 3292.7 N 4735. 9 E 4764. 9 E 4793.9 E 4822.6 E 4851.2 E 10600.0 46.36 51.47 10650.0 46.07 51.64 10700.0 45.72 51.77 10750.0 44.64 51.99 10800.0 44.01 52.05 .35 7809.3 7754.2 5881.4 5899.3 55.8 .64 7843.9 7788.8 5917.5 5935.3 55.8 .71 7878.7 7823.6 5953.4 5971.2 55.8 .19 7914.0 7858.9 5988.8 6006.5 55.7 .26 7949.8 7894.7 6023.8 6041.4 55.7 3315.4 N 3337.9 N 3360.1 N 3382.0 N 3403.5 N 4879.6 E 4907.9 E 4936.0 E 4963.9 E 4991.5 E 10850.0 43.35 52.03 10900.0 43.31 51.62 10950.0 43.06 51.28 11000.0 43.17 51.28 11050.0 43.32 51.62 .31 7985.9 7930.8 6058.3 6075.9 55.7 .57 8022.3 7967.2 6092.6 6110.1 55.7 · 69 8058.7 8003.6 6126.8 6144.2 55.6 .22 8095.2 8040.1 6161.0 6178.3 55.6 · 55 8131.7 8076.6 6195,3 6212.5 55.6 3424 · 7 N 3446.0 N 3467.3 N 3488.7 N 3510.0 N 5018.7 E 5045.7 E 5072.4 E 5099.1 E 5125.9 E 11100.0 42.65 52.00 11150.0 42.17 51.90 11200.0 42.20 52.04 11250.0 41.89 51.98 11300.0 41.42 51.63 1.43 8168.2 8113.1 6229.4 6246.5 55.6 .96 8205.2 8150.1 6263.1 6280.1 55.6 .21 8242.2 8187.1 6296.6 6313.7 55.5 .63 8279.3 8224.2 6330.1 6347.1 55.5 1.05 8316.7 8261.6 6363.4 6380.2 55.5 3531. 1 N 3551.9 N 3572 . 5 N 3593.2 N 3613 . 7 N 5152.7 E 5179.2 E 5205.7 E 5232.1 E 5258.2 E A Gy r o d a t a D i r e c t i o n a i S u rv e y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, Job Number: AK0898GCE486 NORTH SLOPE, ALASKA Page MEASURED I N C L AZIMUTH DEPTH feet deg. deg. DOGLEG VERTICAL SUBSEA VERTICAL CLOSURE SEVERITY DEPTH DEPTH SECTION DIST. AZIMUTH deg./ feet feet feet feet deg. 100 ft. HORIZONTAL COORDINATES feet 11350.0 41.14 51.48 11400.0 40.92 51.37 11450.0 40.64 51.16 11500.0 40.54 51.12 11550.0 40.25 50.93 .59 .47 .62 .22 .63 8354.3 8299.2 6396.4 6413.2 55.5 8392.0 8336.9 6429.2 6445.9 55.5 8429.8 8374.7 6461.8 6478.5 55.4 8467.8 8412.7 6494.4 6510.9 55.4 8505.9 8450.8 6526.8 6543.2 55.4 3634.2 N 5284.0 E 3654.7 N 5309.7 E 3675.1 N 5335.2 E 3695.5 N 5360.5 E 3715.9 N 5385.7 E 11600.0 39.35 51.00 11650.0 38.64 50.72 11700.0 38.22 50.38 1.79 8544.3 8489.2 6558.8 6575.1 55.4 1.48 8583.2 8528.1 6590.2 6606.5 55.4 .94 8622.3 8567.2 6621.3 6637.5 55.3 3736.1 N 5410.5 E 3755.9 N 5434.9 E 3775.7 N 5458.9 E Final Station Closure: Distance: 6637.46 ft Az: 55.33 deg. A Gy r o d a t a D i r e c t i o n a i Survey. for B.P. EXPLOP_ATION WELL: Bi-28L1, 7" Location: BADAMI FIELD, NORTH SLOPE, ALASKA Job Number: AK0898GCE486SS Run Date: 15-Aug-98 15:30:00 Surveyor: TOM STODDARD Calculation Method: MINIMUM CURVATURE Survey Latitude: 70.150000 deg. N Sub-sea Correction from Vertical Reference: 55.1 ft. Azimuth Correction: Gyro: Bearings are Relative to True North Proposed Well Direction: 51.333 deg Vertical Section Calculated from Well Head Location Closure Calculated from Well Head Location Horizontal Coordinates Calculated from Local Horizontal Reference A Gy r o d a t a D i r e c t i o n a i S u rv e y B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, NORTH SLOPE, Job Number: AK0898GCE486SS ALASKA Page SUBSEA I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet -55.1 0.00 0.00 0.00 0.0 .07 92.37 .07 100.0 .18 169.72 .11 200.0 .21 155.27 .11 300.0 .27 140.98 .12 0.0 55.1 155.1 255.1 355.1 0.0 0.0 0.0 · 1 92.4 .4 168.6 .8 166.4 1.2 159.1 0.0 N 0.0 E .1 S .0 E .3 S .1 E .6 S .2 E .9 S .4 E 400.0 .58 150.65 .33 500.0 1.25 165.60 .70 600.0 1.87 172.46 .64 700.0 2.74 174.78 .87 800.0 3.63 175.59 .89 455.1 555.1 655.1 755.1 855.1 -.4 -1.0 -2.3 -4.5 -7.6 2.2 154.9 4.2 158.0 7.4 163.5 12.1 167.7 18.3 170.5 1.6 S .7 E 3.1 S 1.2 E 5.8 S 1.6 E 9.8 S 2.0 E 15.3 S 2.5 E 900.0 4.47 173.63 .86 1000.0 5.70 171.62 1.25 1100.0 6.56 171.28 .85 ].200.0 6.55 171.10 .36 1300.0 5.77 171.47 .78 955.1 1055.1 1155.1 ].255.].. 1355.1 -11.5 -16.1 -21.4 -27.2 -32 .5 26.0 171.8 35.8 172.0 47.1 171.9 58.6 171.7 68.8 171.6 22.3 S 3.2 E 31.2 S 4.4 E 41.8 S 6.0 E 53.1 S 7.7 E 63.8 S 9.4 E ].400.0 4.45 172.47 1.32 1500.0 3.72 172.13 .74 1600.0 3.31 168.60 .46 ].700.0 2.66 166.0]. .69 1800.0 1.94 167.22 .72 1455.1 ].555.1 1655.1 1755.1 1855.1 -37.1 -40.8 -43 .8 -46.1 -47.8 76.8 171..7 83.3 171.7 89.1 171.6 93.9 171.4 97.3 171.2 72.7 S 10.6 E 79.7 S 11.6 E 85.8 S 12.6 E 90.9 S 13.7 E 94.8 S 14.7 E 1900.0 1.45 168.95 .49 2000.0 1.01 165.01 .45 2100.0 .74 144.23 .45 2200.0 .91 110.52 .55 2300.0 3.23 73.65 2.59 ].955.1 2055.1 2155.1 2255.1 2355.1 -49.1 -50.0 -50.4 -50.0 -46.9 99.9 171.1 101.7 171.0 102.9 170.8 103.6 170.3 102.5 168.5 97.7 S 15.3 E 99.8 S 15.8 E 101.1 S 16.3 E 101.9 S 17.4 E 100.8 S 20.6 E A Gyro da t a D i r e c t i o na i Survey B.P. EXPLOPJITION WELL: B1-28L1, 7" Location: BADAMI FIELD, NORTH SLOPE, Job Number: AK0898GCE486SS ALASKA Page SUBSEA I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL DEPTH feet VERTICAL CLOSURE SECTION DIST. AZIMUTH feet feet deg. HORIZONTAL COORDINATES feet 2400.0 6.33 58.14 3.19 2500.0 9.16 59.72 2.83 2600.0 12.10 56.57 3.10 2700.0 16.23 51.56 4.81 2800.0 21.90 56.42 6.11 2455.1 2555.1 2655.1 2755.1 2855.1 -38.7 -25.3 -6.7 17.8 52.1 99.5 163.9 97.5 156.2 97.6 145.3 101.8 131.1 118.5 113.8 96.7 S 27.8 E 89.7 S 39.4 E 79.7 S 55.3 E 65.3 S 75.0 E 45.0 S 102.8 E 2900.0 25.56 61.50 2.76 3000.0 28.30 63.26 2.71 3100.0 29.81 64.39 .63 3200.0 32.46 63.22 2.63 3300.0 35.79 61.19 3.82 2955.1 3055.1 3155.1 3255.1 3355.1 96.1 145.9 200.5 259.3 325.3 149.6 99.2 189.0 89.7 257.9 83.9 308.3 79.8 362.8 76.6 22.5 S 141.1 E 3.4 N 186.0 E 25.5 N 236.4 E 52.3 N 290.2 E 83.2 N 350.0 E 3400.0 39.17 54.56 4.24 3500.0 44.10 54.72 3.11 3600.0 49.84 57.43 3.64 3700.0 53.54 56.81 4.47 3800.0 57.26 54.00 2.74 3455.1 3555.1 3655.1 3755.1 3855.1 401.2 489.9 598.5 721.2 869.3 450.4 73.3 549.0 70.1 659.6 67.6 776.6 66.0 900.0 64.3 124.2 N 414.4 E 175.9 N 486.7 E 237.2 N 576.8 E 303.2 N 681.]. E 387.3 N 803.4 E 3900.0 57.00 51.23 1.59 4000.0 55.84 51.72 1.66 4100.0 55.91 54.16 1.00 4200.0 60.55 57.04 3.50 4300.0 60.41 57.28 3.06 3955.1 4055.1 4155.1 4255.1 4355.1 1024.3 1176.9 1322.7 1480.8 1661.7 1064.8 62.5 1229.0 61.1 1351.8 60.2 1521.5 59.7 1696.6 59.4 482.3 N 925.9 E 577.9 N 1045.0 E 665.5 N 1161.5 E 755.3 N 1292.2 E 853.6 N 1445.2 E 4400.0 57.61 57.55 1.83 4500.0 54.30 57.61 .60 4600.0' 54.16 57.14 .61 4700.0 54.46 57.05 .38 4800.0 54.92 57.63 .59 4455.1 4555.1 4655.1 4755.1 4855.1 1823.2 1969.4 2108.1 2246.5 2386.4 1866.1 59.3 1989.6 59.1 2152.0 59.0 2273.8 58.9 2436.9 58.8 941.1 N 1582.0 E 1020.0 N 1706.1 E 1095.3 N 1823.5 E 1170.8 N 1940.4 E 1246.8 N 2058.7 E A Gyro d a t a D i r e c t i o na i Survey B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, NORTH SLOPE, Job Number: AK0898GCE486SS ALASKA Page SUBSEA I N C L AZIMUTH DOGLEG DEPTH SEVERITY feet deg. deg. deg./ 100 ft. VERTICAL VERTICAL CLOSURE DEPTH SECTION DIST. AZIMUTH feet feet feet deg. HORIZONTAL COORDINATES feet 4900.0 55.18 56.46 .61 4955.1 5000.0 56.11 54.42 1.57 5055.1 5100.0 56.12 53.55 1.15 5155.1 5200.0 54.13 52.04 1.58 5255.1 5300.0 53.16 50.63 2.48 5355.1 2529.6 2674.5 2826.8 2966.2 3104.4 2560.1 58.7 2724.9 58.5 2850.0 58.3 3011.8 58.0 3132.2 57.7 1325.1 N 2179.4 E 1407.2 N 2299.3 E 1496.9 N 2422.6 E 1580.7 N 2534.1 E 1667.9 N 2641.3 E 5400.0 51.83 53.21 1.02 5500.0 50.76, 56.08 1.94 5600.0 49.39 58.80 1.37 5700.0 48.68 58.04 1.25 5800.0 47.90 56.04 .93 5455 5555 5655 5755 5855 .1 .1 .1 .1 .1 3233.7 3358.4 3476.2 3590.5 3702.0 3289.3 57.5 3405.8 57.4 3519.9 57.4 3633.0 57.4 3744.6 57.4 1747.8 N 2742.9 E 1820.1 N 2844.8 E 1884.0 N 2944.5 E 1943.7 N 3043.2 E 2004.7 N 3137.2 E 5900.0 47.42 56.40 .88 6000.0 47.38 55.80 1.10 6100.0 48.40 55.88 .87 6200.0 48.09 53.90 1.39 6300.0 48.41 53.76 .33 5955.1 6055.1 6155.1 6255.1 6355.1 3811.4 3920.0 4030.0 4142 .4 4254.5 3855.3 57.4 3965.9 57.4 4077.4 57.3 4189.3 57.3 4301.2 57.2 2065.8 N 3228.4 E 2126.0 N 3319.3 E 2188.1 N 3410.5 E 2252.5 N 3502.9 E 2319.1 N 3593.3 E 6400.0 48.67 54.57 .58 6500.0 48.37 54.04 1.49 6600.0 47.23 52.36 1.29 6700.0 46.94 53.19 .28 6800.0 46.81 52.00 .85 6455.1 6555.1 6655.1 6755.1 6855.1 4367.4 4481.3 4591.4 4698.7 4805.5 4413.5 57.1 4526.1 57.0 4636.4 56.9 4745.8 56.8 4854.9 56.7 2385.2 N 3684.9 E 2451.1 N 3778.0 E 2517.4 N 3866.0 E 2582.0 N 3951.7 E 2646.9 N 4036.6 E 6900.0 46.69 52.09 .85 7000.0 47.48 52.88 .95 7100.0' 48.19 51.84 .84 7200.0 49.51 51.92 1.06 7300.0 49.93 51.27 1.00 6955.1 7055.1 7155.1 7255.1 7355.1 49].1.6 5019.4 5129.6 5244.0 5362.1 4963.7 56.6 5073.8 56.5 5185.0 56.5 5298.2 56.4 5412.4 56.3 2712.3 N 4120.2 E 2778.5 N 4205.2 E 2845.6 N 4292.7 E 2916.9 N 4382.2 E 2989.9 N 4475.0 E A G y r o d a t a B.P. EXPLORATION WELL: B1-28L1, 7" Location: BADAMI FIELD, NORTH SLOPE, ALASKA Job Number: AK0898GCE486SS Direct i ona 1 Survey Page SUBSEA I N C L AZIMUTH DOGLEG VERTICAL VERTICAL DEPTH SEVERITY DEPTH SECTION feet deg. deg. deg./ feet feet 100 ft. CLOSURE DIST. AZIMUTH feet deg. HORIZONTAL COORDINATES feet 7400.0 49.46 51.74 .85 7455.1 5480.5 7500.0 49.25 51.01 .34 7555.1 5597.0 7600.0 48.55 50.85 .72 7655.1 5711.8 7700.0 47.47 50.81 1.28 7755.1 5823.3 7800.0 45.96 51.68 .66 7855.1 5929.0 5526.5 56.2 5639.8 56.1 5752.2 56.0 5863.1 55.9 5971.2 55.8 3063.3 N 4567.9 E 3136.0 N 4658.9 E 3208.5 N 4747.9 E 3279.0 N 4834.3 E 3345.0 N 4916.9 E 7900.0 43.91 52.05 1.27 7955.1 6028.9 8000.0 43.08 51.32 .67 8055.1 6123.4 8100.0 42.89 51.87 1.12 8155.1 6217.1 8200.0 42.10 52.02 .35 8255.1 6308.3 8300.0 41.14 51.47 .59 8355.1 6397.1 8400.0 40.57 51.13 .35 8455.1 6483.5 8500.0 39.15 50.92 1.70 8555.]. 6567.5 8567.2 38.22 50.38 .94 8622.3 6621.3 6075.9 55.7 6144.2 55.6 6246.5 55.6 6347.1 55.5 6445.9 55.5 6510.9 55.4 6606.5 55.4 6637.5 55.3 3406.6 N 4995.5 E 3465.2 N 5069.8 E 3523.5 N 5143.1 E 3579.7 N 5214.9 E 3634.7 N 5284.6 E 3688.7 N 5352.0 E 3741.6 N 5417.3 E 3775.7 N 5458.9 E Final Station Closure: Distance: 6637.46 ft Az: 55.33 deg. RECEIVED O C ? 0 7 1998 BPXA PDC Badami Alaska State Plane Zone 3 Badami CPF B1-28L1 SURVEY REPORT 24 September, 1998 ORIGINAL Your Reft API-500292289960 Last Survey Date 25-August-95 Job# AKVC$0308 KBE- 55.62' DRILLING ~:; E RVIC' E =; Survey Ref: svy602 Badami Sperry-Sun Drilling Services Survey Report for B'I-28L1 Your Ref: API-500292289960 Alaska State Plane Zone 3 Badami CPF Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 11700.00 38.220 50.380 8566.72 8622.34 3775.69 N 5458.94 E 11753.74 36.760 50.560 8609.36 8664.98 3796.51 N 5484.17 E 11849.86 35.490 50.410 8687.00 8742.62 3832.56 N 5527.88 E 11945.47 34.480 49.020 8765.33 8820.95 3868.00 N 5569.70 E 11990.21 33.810 48.380 8802.36 8857.98 3884.57 N 5588.57 E 12076.15 33.420 49.470 8873.93 8929.55 3915.83 N 5624.43 E 12107.62 34.450 48.960 8900.04 8955.66 3927.31 N 5637.74 E 12138.75 36.190 46.580 8925.44 8981.06 3939.41 N 5651.05 E 12170.02 38.360 43.960 8950.32 9005.94 3952.74 N 5664.50 E 12201.62 40.150 41.470 8974.79 9030.41 3967.44 N 5678.05 E 12233.50 41.980 39.470 8998.82 9054.44 3983.37 N 5691.64 E 12265.16 43.960 37.520 9021.99 9077.61 4000.26 N 5705.06 E 12295.73 45.780 35.620 9043.66 9099.28 4017.58 N 5717.91 E 12326.96 47.140 33.240 9065.17 9120.79 4036.26 N 5730.70 E 12355.28 48.160 32.510 9084.25 9139.87 4053.83 N 5742.06 E 12391.23 49.410 32.470 9107.93 9163.55 4076.64 N 5756.58 E 12485.22 49.860 33.830 9168.81 9224.43 4136.60 N 5795.75 E 12580.28 49.420 33.140 9230.37 9285.99 4197.01 N 5835.71 E 12673.90 48.430 32.680 9291.88 9347.50 4256.26 N 5874.06 E 12769.05 46.760 32.570 9356.04 9411.66 4315.43 N 5911.94 E 12863.51 47.370 32.610 9420.39 9476.01 4373.70 N 5949.18 E 12957.63 46.730 32.720 9484.52 9540.14 4431.69 N 5986.37 E 13050.91 45.660 33.810 9549.09 9604.71 4487.98 N 6023.29 E 13146.35 44.000 33.510 9616.77 9672.39 4543.98 N 6060.58 E 13241.02 43.000 32.790 9685.44 9741.06 4598.54 N 6096.22 E 13335.53 41.850 33.900 9755.20 9810.82 4651.80 N 6131.26 E 13524.66 40.060 34.560 9898.03 9953.65 4754.30 N 6200.98 E 13619.00 39.020 34.870 9970.79 10026.41 4803.67 N 6235.18 E 13713.79 37.930 33.950 10045.00 10100.62 4852.32 N 6268.51 E 13808.37 36.250 33.630 10120.44 10176.06 4899.72 N 6300.23 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fi) (°/100fi) (ft) 5910102.10 N 369551.46 E 6621.29 5910122.46 N 369577.06 E 2.724 6653.99 5910157.72 N 369621.42 E 1.324 6710.65 5910192.40 N 369663.87 E 1.346 6765.45 5910208.64 N 369683.03 E 1.699 6790.53 5910239.25 N 369719.45 E 0.836 6838.07 5910250.48 N 369732.95 E 3.396 6855.62 5910262.34 N 369746.48 E 7.125 6873.58 5910275.43 N 369760.16 E 8.596 6892.41 5910289.88 N 369773.98 E 7.546 6912.17 5910305.57 N 369787.85 E 7.066 6932.73 5910322.21N 369801.58 E 7.532 6953.77 5910339.30 N 369814.73 E 7.394 6974.62 5910357.74 N 369827.85 E 7.034 6996.28 5910375.11 N 369839.53 E 4.074 7016.13 5910397.66 N 369854.46 E 3.478 7041.72 5910456.90 N 369894.69 E 1.202 7109.76 5910516.59 N 369935.73 E 0.721 7178.71 5910575.14 N 369975.14 E 1.120 7245.67 5910633.62 N 370014.07 E 1.757 7312.21 5910691.21N 370052.36 E 0.647 7377.71 5910748.52 N 370090.58 E 0.685 7442.97 5910804.14 N 370128.50 E 1.424 7506.97 5910859.47 N 370166.80 E 1.753 7571.08 5910913.37 N 370203.41 E 1.179 7632.99 5910966.00 N 370239.40 E 1.452 7693.63 5911067.23 N 370310.95 E 0.974 7812.11 5911115.97 N 370346.03 E 1.122 7869.66 5911164.02 N 370380.23 E 1.299 7926.08 5911210.84 N 370412.80 E 1.788 7980.47 Comment Tie-on Survey Continued... 24 September, 1998 - 15:32 - 2 - DrillQuest Sperry-Sun Drilling Services Survey Report for B'I.28L1 Your Ref: API-500292289960 Badami Measured Sub-Sea Vertical Depth Incl. Azim. Depth Depth (ft) (ft) (ft) Local Coordinates Global Coordinates Northings Eastings Northings Eastings (ft) Ct) (ft) (rt) 13902.81 34.770 34.260 10197.31 10252.93 4945.23 N 6330.86 E 5911255.79 N 370444.23 E 13997.26 33.030 34.150 10275.70 10331.32 4988.79 N 6360.47 E 5911298.82 N 370474.62 E 14091.29 31.950 34.430 10355.02 10410.64 5030.52 N 6388,93 E 5911340,03 N 370503.82 E 14185.43 30.410 33.970 10435.55 10491.17 5070.83 N 6416.32 E 5911379.84 N 370531.94 E 14280.64 29.010 34.410 10518.25 10573.87 5109.86 N 6442.84 E 5911418.39 N 370559.15 E 14374.30 27.670 34.080 10600.68 10656.30 5146.61 N 6467.86 E 5911454.69 N 370584.82 E 14469.06 26.420 34.060 10685.08 10740.70 5182.30 N 6491.99 E 5911489.94 N 370609.60 E 14490.84 26.390 34.380 10704.58 10760.20 5190.31 N 6497.44 E 5911497.85 N 370615.19 E 14553.00 26.390 34.380 10760.27 10815.89 5213.11N 6513.04 E 5911520.37 N 370631.20 E All data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well. Northings and Eastings are relative to Well. The Dogleg Severity is in Degrees per 100ft. Vertical Section is from Well and calculated along an Azimuth of 51.330° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14553.00ft., The Bottom Hole Displacement is 8342.44ft., in the Direction of 51.326° (True). Dogleg Rate (°/100ft) 1.614 1.843 1.160 1.655 1.488 1.440 1.319 0.668 0.000 Vertical Section (fi) 8032.81 8083.15 8131.44 8178.02 8223.11 8265.61 8306.75 8316.01 8342.44 Comment Projected Survey Alaska State Plane Zone 3 Badami CPF Continued.,. 24 September, 1998 - 15:32 - 3 - DrillQuest Badarni Sperry-Sun Drilling Services Survey Report for B1.28LI Your Ref: API-500292289960 Alaska State Plane Zone 3 Badami CPF Comments Measured Depth 11700.00 14553.00 Station Coordinates TVD Northings Eastings (ft) (ft) (fi) 8622.34 3775.69 N 5458.94 E 10815.89 5213.11 N 6513.04 E Comment Tie-on Survey Projected Survey 24 September, 1998.15:32 - 4 - DrillQuest BP EXPLORATION, Alaska Date: 10-7-98 Trans# 89631 BADAMI OPEN HOLE LOG DATA Enclosed is the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166 Trans Num Sw Name Log Type Rec Date Company Code Run Num Api Num 89631 B1-28L1 MUDLOG 24-Aug-981 SPERRY 500292289960 89631 B1-28 MUDLOG 19-Sep-98! SPERRY 500292289900 89631 B1-28L2 MUDLOG 08-Sep-98 SPERRY 500292289961 89631 B1-28L2 MUDLOG 08-Sep-98 SPERRY 500292289961 89631 B1-28L1 MUDLOG 24-Aug-98 SPERRY 500292289960 89631 B1-28 MUDLOG 19-Sep-98 SPERRY 500292289900 Please sign and return one copy of this transmittal to: Carla Harris Petrotechnical Data Center LOG DATA AOGCC- 1 blueline/1 sepia PETROFINA- 1 blueline/1 sepia DNR - 1 blueline BP - - 1 blueline Howard Oakland Mike Engle Tim Rhyherd Evelyn Raybon Petrotechnical Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 BP EXPLORATION, Alaska Date: 10-7-98 Trans# 89604 BADAMI OPEN HOLE LOG DATA Enclosed is the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166 Trans Num Sw Name Log Type Rec Date Company Code Run Num Api Num 89604 B1-28L1 Z-DENSILOG 28-Aug-98 IATLAS 1 500292289960 89604 B1-28L1 Z-DENSILOG 28-Aug-98 !ATLAS I 500292289960 Please sign and return one copy of this transmittal to: Ca rlaHa rris ~..._..~~"~ ~,~~.~j~_~,~ Petrotechnical Data Center '.:... Howard Oakland Mike Engle Tim Rhyherd Evelyn Raybon LOG DATA AOGCC- 1 blueline/1 sepia PETROFINA- 1 blueline/1 sepia DNR - 1 blueline BP - - 1 blueline OCT 0 T 1998 Petrotechnicai Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 BP EXPLORATION, Alaska Date: 10-7-98 Trans# 89600 BADAMI OPEN HOLE LOG DATA Enclosed is the materials listed below. If you have any questions please contact me in the Petrotechnical Data Center at (907) 564-4166 Trans Num Sw Name Log Type Rec Date Company Code Run Num Api Num 89600 B1-28L1 MAC 15-Sep-98 ATLAS 1 500292289960 89600 B1-28L1 MAC 15-Sep-98 ATLAS 1 1500292289960 , Please sign and return one copy of this transmittal to: Petrotechnical Data Center LOG DATA AOGCC- 1 blueline/1 sepia PETROFINA- I blueline/1 sepia DNR - 1 blueline BP - - 1 blueline Howard Oakland Mike Engle Tim Rhyherd Evelyn Raybon Petrotechnicai Data Center, MB3-3 900 East Benson Boulevard, P.O. Box 196612, Anchorage, Alaska 99519-6612 TONY KNOWLE$, GOVERNOR ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 PORCUPINE DRIVE ANCHORAGE, ALASKA 99501-3192 PHONE: (907) 279-1433 FAX: (907) 276-7542 Jul,,' 14. 1998 Mike E. Miller Badami Drilling Team Lcadcr BP Exploration (Alaska) Inc. P O Box 196612 Anchorage, AK 99519-6612 Badami Unit B 1-28L 1 BP Exploration (Alaska) Inc. Permit No. 98-131 Sur. Loc.: 3858'NSL. 5266'WEL. Sec. 9. T9N. R20E. UM Btmholc Loc: 1565'SNL. l I72'EWL. Sec. 3. T9N. R20E. UM Dear Mr. Miller: Enclosed is the approvcd application for permit to drill thc abovc rcfcrcnccd well. Thc permit to drill docs not cxcmpt you from obtaining additional pcrmits required bx' lax',: from other governmental agcncics, and docs not authorize conducting drilling operations until all other required permitting determinations are made. The permit is for a nc~v xvcllborc scgmcnt of existing wcll B1-28. Permit No. 98-130. API 50- 029-22899. Production should continue to bc rcportcd as a function of thc original API number stated above. Blowout prevention equipment (BOPE) must bc tcstcd in accordance with 20 AAC 25.035. Sufficicnt noticc (approximatcly 24 hours) of thc BOPE tcst pcrformcd bcforc drilling below the surface casing shoc must bc givcn so that a rcprcsentativc of thc Commission max' witness the test. Notice may be given by contacting the Commission pctrolcum ficld inspcctor on the North Slope pager at 659-3607. BY ORDER OF THE COMMISSION dl0enclosures cc: Department of Fish & Game. llabitat Section w;o encl. Department of l,;nviromnental Conservation w. o encl. .' STATE OF ALASKA ALASK,~ .... AND GAS CONSERVATION COM~. .... SSlON PERMIT TO DRILL t" 20 AAC 25.005 /7¢~ =,.,,,,-,, ...................... P./~_L'ESTED la. Type of work [] Drill [] Redrill Ilb. Type ofwell [] Exploratory []Stratigraphic Test [] Development Oil []Re-Entry I--IDeepenI []Service I--IBevelopmentGas [] Single Zone I--I Multiple Zone 2. Name of Operator 5. Datum Elevation (DF or KB) 10. Field and Pool BP Exploration (Alaska) Inc. Plan KBE = 55.1' Badami !3. Address 6. Property Designation P.O. Box 196612, Anchorage, Alaska 99519-6612 ADL365533 4. Location of well at surface 7. Unit or Property Name 11. Type Bond (See 20 AAC 25.025) 3858' NSL, 5266' WEL, SEC. 9, T9N, R20E, UM Badami Unit At top of productive interval 8. Well Number Number 25100302630-277 1638' SNL, 1224' EWL, SEC. 3, T9N, R20E, UM B1-28L1 Attotal depth 9. Approximate spud date Amount $200,000.00 1565' SNL, 1172' EWL, SEC. 3, T9N, R20E, UM 07/25/98 12. Distance to nearest property line113. Distance to nearest well 14. Number of acres in property 15. Proposed depth (MD and TVD) ADL 377011,1565'I B1-21, 74' at 2575' MD 5120 14329' MD/10705' TVD 16. To be completed for deviated wells 17. Anticipated pressure {see 20 AAC 25.035 (e)(2)} Kick Off Depth 500' MD Maximum HoleAngle 56° Maximum surface 4400 psig, At total depth (TVD) 10094'/6326psig 18. Casing Program Setting Depth Size Specifications Top Bottom Quantity of Cement Hole Casing Weight Grade Coupling Length MD TVD MD TVD (include stage data) 24" 20" 91.1# H-40 Weld 80' 37' 37' 116' 116' 260 sx Arctic Set (Approx.) 12-1/4" 9-5/8" 40# L-80 BTC 5452' 35' 35' 5487' 4555' 2930 sx PF 'E', 360 Class 'G' 8-1/2" 7" 29# P110 BTC-Mod 11920' 33' 33' 11953' 8935' 185 sx Class 'G' 6" 4-1/2" 12.6# L-80 BTC 300' 14009' 10450' 14329' 10705' Uncemented slotted liner 19. To be completed for Redrill, Re-entry, and Deepen Operations. Present well condition summary Total depth: measured feet Plugs (measured) true vertical feet Effective depth: measured feet Junk (measured) true vertical feet Casing Length Size Cemented M D TVD Structural Conductor Surface Intermediate Production Perforation depth: measured .., ~,c~?~ ()il ~}. (i:?~ C,:'~r!~ true vertical .,'~¥-..'. 20. Attachments [] Filing Fee [] Property Plat [] BOP Sketch [] Diverter Sketch [] Drilling Program [] Drilling Fluid Program []Time vs Depth PIct [] Refraction Analysis [] Seabed Report [] 20 AAC 25.050 Requirements Contact Engineer Name/Number: Mike Miller, 564-5066 Prepared By Name/Number: Carol Withey, 564-4114 21. I hereby certify that the foregoing is true and correct to the best of my knowledge Signed Mike E. Miller '--~_~ ~ f~l~~ Title Badami Drilling Team Leader Date Commission Use Only Permit Number APl Number I Approval Dat~ See cover letter ~ ~ - ! 3, I 50- O,~. ~/- P, 2,. t~ "/o/_ ~ ~)I ~" / ¢'"f~ for other requirements Conditions of Approval: Samples Required []Yes ~ No Mud Log Required []Yes IXINo Hydrogen Sulfide Measures []Yes [~No Directional Survey Required [~]Yes I--INo Required Working Pressure for BOPE 1--12M; []3M; ~5M; [-I10M; [-115M Other: :~:,~-~t S~gned By by order of Approved By 0avid W. Johnston Commissioner the commission Date Form 10-401 Rev. 12-01-85 Submit In Triplicate Shared Services Drilling Contact: I Well Name: B1-28 Producer - Multi-lateral PERMIT Mike Miller 564-5066 Ial-28 I Well Plan Summary DA TA COMMON TO ALL THREE PENETRATIONS (PRIMARY AND BOTH LATERALS): I Type of Well (producer or injector): Producer- Multi-Lateral Open-Hole Surface Location' I 3858' FSL 5266' FEL SEC 9, T9N, R20E, UM, AK Estimated Start Date: I July 25, 1998 I [Operating days to complete: 148 I Well Design- Ultra slimhole- multi-lateral open hole completion w/slotted liner Formation Tops MD TVD (bkb) Remarks base permafrost 1959 1955 Top Middle Brookian (TMBK) 9380 7056 M90 10956 8181 Base West Sak (M85) 11340 8465 Casing/Tub ing Program: Hole ~ize Csg~ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/I'VD MD/TVD brt 24" 20" 91.1 # H-40 Weld 80 37/37 116/116 12-1/4" 9-5/8" 40# L-80 BTC 5452 35/35 5487/4555 8-1/2" 7" 29# P110 BTC- 11920 33/33 11953/8935 mod IInternal yield pressure of the 7" 29#/ft P110 casing is 11220 psi, which is greater than the maximum anticipated surface pressure of 4400 psi (6326 psi at 10094' tvd; gas, 0.1 psi/E, surface to 6570'; oil, 0.36 Psi/ft, 6570 to 10094' tvd). Wellhead rating is 5000 psi for starting head (intermediate casing) and 10,000 psi for tubing head (10,000 psi is required not for drilling, but for injection, during which surface pressures will reach 5500 psi). BOPE is 10000 psi to match the wellhead rating and to allow for any remote chance that a higher pressure sand is encountered that would exceed 5000 psi shut-in surface pressures. Logging Program: Open Hole Logs: Surface None Intermediate MWD/GR @ hole section TD Production MWD/GR/RES · planned for entire hole section BI-28 Producer - Multi-lateral PERMIT Mud Pro[fram: Special design considerations [ displace OH laterals to 5% KCL water based muds Surface Mud Properties: I Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 8.6 150 25 20 45 9 10 to to to to to to to · , 9.8 - 10.0 300 60 30 60 9.5 15 Intermediate Mud Properties: I KCL polymer De. nsity Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 9.2 45 15 8 15 8.5 6-8 to to to to to to to 10.1 55 20 10 25 9.5 4-6 Production Mud Properties: I KCL polymer Density Marsh Yield 10 sec 10 min pH Fluid (PPG) Viscosity Point gel gel Loss 12.0 45 10 8 15 8.5 4-5 to to to to to to to 12.4 55 15 10 20 9.5 4-5 Well Control (Secondary) · Diverter Waiver Requested Well control equipment consisting of 10,000 psi W.P.(2) pipe rams, (1) blind rams, and 5M WP annular preventer will be installed and is capable of handling maximum potential surface pressures.10 M WP Choke & kill manifold. BOPE and drilling fluid system schematics on file. Waste Manaqement: Cuttings Handling: the cuttings will be processed through the onsite Grind and Inject facility and injected into disposal well B1-01. Surface gravels will be washed and stored for construction purposes. Fluid Handling: All drilling and completion fluids will be processed through the onsite Grind and Inject facility and injected into disposal well B1-01. Annular Injection: No annular injection is planned at this time. DRILLING HAZARDS AND RISKS: , Wellbore proximity comments are addressed under each MLOH section. Junk (auger tooth) was encountered in the B1-16 conductor - if junk is encountered, ensure all junk is fished prior to commencing drilling. Stuck pipe - UGNU sands, West Sak Sands - differential Coals - stringers throughout well, 4500' to Canning formations at 9500' tvd. Badami sands are overpressured - normally 12.2ppg mw required at TD. Pressure transition begins just above shallowest sand. Shallow sands typically pressured between normal and the 12.2 ppg required in lower sands. Maintain minimum mud weight and utilize latest techniques to manage lost circulation hazards in shallow sands (flow rates, tapered drill string). Weight up as wellbore pressures dictate, maintaining a 200 psi overbalance throughout. B 1-28 Producer - Multi-lateral PERMIT Hazards of well control and stuck pipe are managed by setting 7" casing above shallowest sand, before penetrating the full overpressure. Hazard of lost circulation is managed by proper techniques to maintain Iow ECD - ECD of 13.5 ppg noted to be maximum allowable to prevent lost circulation. B 1-28 Producer - Multi-lateral PERMIT .... DA TA SPECIFIC TO EACH OF THE THREE PENETRATIONS (PRIMARY AND BOTH LATERALS): B1-28 L1 - HOLE gl - first penetration below 7" intermediate casing: I TD MD: I14329 I Badami Sand F5 Primary target Bottom Hole Location (TD) lTD TVD: 110705 BRT I 1638'FNL 1224' FWL SEC 3, T9N, R20E, UM, AK 1565' FNL 1172' FWL SEC 3, T9N, R20E, UM AK Formation Markers: Formation Tops MD TVD (bkb) Remarks Shallowest Badami Sand 12081 9035 Badami Sand K2 13461 9984 Badami Sand F3 13716 10186 Badami Sand F4 13880 10321 Badami Sand F5 14062 10474 Primary Sand Badami Sand A5 14150 10548 Total Depth 14329 10705 Casingrrubing Program: Hole §ize - Cs'g/ Wt/Ft Grade Conn Length Top Btm Tbg O.D. MD/TVD MDrrVD brt 6" 4-1/2" 12.6# L-80 BTC 300 14009/10450 14329/10705 slotted liner NOTE: slotted liner will only be installed if sufficient amalgamated pay exists as determined by logs and petrophysicist. Length of slotted liner will be adjusted to cover an interval from TD to above top of amalgamated pay. If insufficient amalgamated continuous pay exists to warrant the slotted liner, none will be run. Logging Program: Production Hole RFT Cased Hole Logs' MWD GR/Resistivity; HDIL/ZDL/CN/MAC,MIRL; STAR 10 pressures, 2 fluid samples none Directional: KOP: 15OO'md/5OO' tvd Maximum Hole Angle: Close Approach Well: 56 DEG. At time of spud wells: B1-01,B1-21,B1-11,B1-18, B1-14,B1-16 & B1-15 will exist. 4 B1-28 Producer - Multi-lateral PERMIT Badami B1-28 Multi-lateral Proposed Summary of Operations 1. Weld the starting head on the conductor. 2. Prepare the location for the rig move. 3. MIRU Nabors 28E drilling rig. Build spud mud. A diverter is requested from AoGcc. 4. PU 12-1/4" bha & drill surface hole as per directional plan. Run directional MWD from surface to TD. 5. Run 9-5/8" surface casing and cement to surface in two stages. 6. NU 13-5/8" 10M BOPE. Test BOPE to 5000 psi. 7. RIH with BHA, test casing to 3000 psi. Drill out float equipment and 20' of new formation. Perform a LOT as per SSD Standard Operating Procedure. Contact the Badami Drilling Team Leader or SSD Superintendent with LOT test results before drilling ahead. 8. Drill 8-1/2" hole to intermediate casing TD as per directional plan, with MWD directional surveys. 9. Run 7" casing and cement as per Cement Procedure (1000' md of cement above shoe). Test BOPE to 6000 psi. 10. Drill out float equipment and 20' of new formation. Perform FIT to 13.5 ppg minimum equivalent. 11. Drill 6" hole to B1-28 L1 - [Hole #1] target TD as per directional plan with GR/Resistivity MWD. Utilize latest techniques for reducing lost circ~ulation risk (tapered string, flow rate limitations, ECD limits, mud rheology, etc.). 12. If insufficient interval of amalgamated pay exists as determined by logs, no slotted liner will be run in this hole. If a sufficient interval of amalgamated pay exists as determined by logs and petrophysicist, run 4- I/2" slotted liner (with inner string) from TD to just above the top of the amalgamated pay (exact depths to be determined from logs). [This will leave open hole above top of slotted liner]. Set liner on bottom, release from liner with HES hydraulic setting tool. Displace liner and open hole to above KOP for B 1-28 L2 [Target #2] to kill-weight water based mud w/5% KCL. POOH. 13. RIH with BHA and perform open-hole, low-side kickoff. Use most aggressive BHA design to ~et off (tricone or PDC sidetrack bit, 1.83 - 2.15 motor housing bend, etc.) Drill to B 1-28 L2 [Hole :#2] target TD as per directional plan with GR/Resistivity MWD. 14. If insufficient interval of amalgamated pay exists as determined by logs, no slotted liner will be run in this hole. If a sufficient interval of amalgamated pay exists as determined by logs and petrophysicist, run 4-1/2" slotted liner (with inner string) from TD to just above the top of the amalgamated pay (exact depths to be determined from logs). Set liner on bottom, release from liner via hydraulic releasing tool. Displace liner and open hole to above KOP for B 1-28 [Target #3] to kill-weight water based mud with 5% KCL. POOH. 15. RIH with BHA and perform open-hole, low-side kickoff. Drill to B1-28 [Hole #3] target TD as per directional plan with GR/Resistivity MWD. This will be designated the primary wellbore. 16. Run 4-1/2" slotted liner (With inner string) from TD to above top of shallowest sand, and blank 4- I/2" liner from above top of shallowest sand to 50' inside the 7" intermediate casing. Release from liner via hydraulic releasing tool. Displace liner and open hole to above KOP for B 1-28 [Target #3] to kill-weight water based mud with 5% KCL. POOH. B 1-28 Producer- Multi-lateral PERMIT 17. RIH with 4-1/2" completion assembly with 3.813" PXN plug in place in "XN" nipple. Fill tubing with 8.6# fresh water while running in hole. Position Halliburton "TNT" packer setting depth to +/- 100' md above 7" 29# intermediate csg. shoe. Record piCk up and slack off weights. 18. M/U connect 2 ea. ~A" 316 SS 0.049" wt. WLRSV landing nipple control lines to FMC 4-1/16" 10 M tubing hanger. Test control lines to 5000 psi - hold pressure for 10 mins. 19. Land FMC 4-1/16" 10 M tubing hanger and RILDS to energize FMC tubing hanger packoff assembly. - ~. 20. Pressure up tubing to 500 psi. Shut down and monitor pressure for leaks. Pressure tubing to 7000 psi to set production packer. Reduce pressure to 3500 psi. Hold pressure for 30 minutes and record 6n Barton recorder chart as 4-1/2" tubing pressure test. Maintain 4-I/2" tubing pressure at 3500 psi and pressure up 4-1/2" x 7" annulus to 3500 psi.. Hold pressure for 30 minutes and record on Barton recorder chart as 4-1/2 "x 7" annular pressure test. Bleed 4-H2"x7" annulus pressure off prior to bleeding down tubing pressure. Notify the AOGCC 24 hours prior to testing the tubing and the annulus for AOGCC witnessing. Complete the AOGCC MIT test forms. Fax form to AOGCC and ENS/Badami offices. 21. Back out and L/D landing joint. Install "two way" check valve in FMC 4-1/16" 10M hanger profile. 22. Nipple down 13-5/8" 10 M Hydril BOPs. Nipple up the FMC 11" 10M x 4-1/16" 5M tubing head adapter and Cameron 4-1/16" 5M tree. Test control line to 5000 psi. Test the tubing head adapter · and Cameron 4-1/16" 5M tree to 5000 psi. Pull the "two way" check valve. Orient tree wing valve and S-riser/downcomber as per Badami orientation diagram. 23. Pressure up on 4-1/2" x 7" tbg/csg, annulus - shear RP valve in lower GLM station. RP shear valve requires 2900 psi of differential pressure t.o shear. Calculated surface annular pressure to shear "open" the RP shear valve is +/- 1200 psi.' 24. Pump down 4-1/2" 12.6# IBT L80 tubing to displace mud from the 4-1/2"x 7" annulus. Maximum displacement rate = 3 bpm through RP valve. Freeze protect well with diesel by "U" tubing from annulus side to tubing side. 25. R/U slickline. Pull wLR~v dummy. 26. RIH w/slickline and retrieve RP valve in lower GLM, pooh., RIH w/ slickline w/dummy valve, and locate in lower GLM sidepocket. 27. RIH w/ slickline and pull pressure equalizing prong in "PXN" plug. Pull "PXN" plug'body. Caution: Be aware of differential pressure below "PXN" plug during pulling operations - adjust for downhole differential pressure with equal surface pressure. 28. RIH w/ WLRSV and locate in HXO landing nipple. 29. Close SSSV & install two-way check, Secure well. RD/MO Nabors 28E rig, release rig. Transfer custody of well to Operations. B 1-28 Producer - Multi-lateral PERMIT Badami B1-28 CASING SIZE: 9-5/8" SPACER: SURFACE CASING CEMENT PROGRAM - HALLIBURTON 100 bbls fresh water. STAGE1 LEAD: ADDITIVES: WEIGHT: APPROX #SACKS: STAGE1 TAIL: ADDITIVES: WEIGHT: APPROX #SACKS: TYPE 'E' PERMAFROST Retarder 12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk 430 SACKS THICKENING TIME: Greater than 4 hrs at 50° F. Volume based on gauge hole annular capacity from 1000' above the casing shoe to the ES cementer at 2200' md, plus 30% excess. Premium . 2% calcium chloride 15.8 ppg YIELD:l.15 ft3/sx MIX WATER: 5.0 gal/sk 360SACKS THICKENING TIME: Greater than 4 hrs at 50° F. Volume based on 1000' md of fill in the gauge hole plus 30% excess plus 80' ~hoe joint. SPACER: 50 BBLS FRESH WATER STAGE 2: ADDITIVES: WEIGHT: APPROX #SACKS: TYPE 'E' PERMAFROST Retarder 12.0 ppg YIELD:2.17 ft3/sx MIX WATER: 11.63 gal/sk 2500 SACKS THICKENING TIME: Greater than 4 hrs at 50° F. ' Volume based on gauge hole annular capacity from the ES Cementer at 2200' surface plus 250% excess, plus casing capacity from surface to the stage collar. Note: Pump until cement returns are observed at surface. WELLHEAD STABILITY CEMENT TYPE: Permafrost E NOTE: ADDITIVES: Retarder WELLHEAD STABILITY CEMENT WILL BE PUMPED ONLY WITH APPROVAL OF APPROPRIATE SUPERINTENDENT IF THERE ARE NO CEMENT RETURNS TO SURFACE OR THE CEMENT TOP FALLS BELOW SURFACE AFTER THE PUMPS ARE SHUT DOWN. WEIGHT: 12.0 ppg YIELD:2.17 ft3/sx APPROX NO SACKS: To be determined on job x job basis MIX WATER: 11.63 gal/sk B 1-28 Producer- Multi-lateral PERMIT INTERMEDIATE CASING CEMENT PROGRAM- HALLIBURTON CASING SIZE: 7" SPACER: 20 bbls fresh water preflush followed by 50 bbls alpha spacer weighted lppgabove current mud weight. ; CEMENT: ADDITIVES: WEIGHT: APPROX #SACKS: Premium HR-5 as required (retarder), .2% Halad-344 (fluid loss), 0.2% CFR-3 (dispersant) 15.8 ppg YIELD:1.15 ft3/sx MIX WATER: 5.0 gal/sk 185 SACKS THICKENING TIME: Greater than 4 hrs at 50° F. Volume based on 1000' md of gauge hole annular capacity from shoe, plus 50% excess, plus 80' shoe joint. MULTI-LATERAL WELL ABANDONMENT PROGRAM The following program is to be used at such time as the wellbores below the 7' intermediate casing are to be abandoned. 1. MIRU Rig. 2. Kill Well. 3. Pull tubing, packer, completion. 4. RIH with 7" EZSV cement retainer and set 50-100' inside the 7" intermediate casing and above all perforations in the 7", if any exist. 5. Mix and pump a volume of premium class G cement to fill the 7" casing below the EZSV and the calculated volume to fill the entire hole section of all wellbores below the 7" shoe, plus 10%. 6. Unsting from EZSV. ' 7. Pressure test the EZSV and cement to 3000 psi. 8. Procedures for the remainder of the wellbore above the EZSV will depend on the future plans for the wellbore (total abandonment, sidetrack, etc.). 10 JUN-~2-98 MON 11:07 ~M SPERRY-SU~ F~× NO. 19075635754 P, 02 :. . : 5631 Sliver·do Way #G Anchorage, Alaska 99518 (907) 563-3256 Fax (907) 563-7252 Shared Services Drilling Mike Cook Approved Well Close Approach Review Badami / B1-28 Wp4 Mike, The above m~ntioned well ha~ b~¢n tcannc, d tulu{ ~tudard anti-~ollb{on mc~hod~ via DP.AY. Tho scan wu l~d'orm~d vdth ~e following pattme~,: Start .';mn luspe~Uon Zm~ 35.30 ' End Scan tnspe~Uon Zone 14~32¢.42 ' Starting Stun Rndlus 200,00 Rate of Pad{us ]nc. rinse (pt.r I000') I00,00 Anti-Collision Scan summary: A1 ~e plan~edKOP~eSttrtingScauRadius b 98,23~' l~rse~thtuDEAF't dmfault~tttn~ of 100'$1,trtSctn Rndlu~lnc~.~lug at $0' ' p~r 1000 'MD for n new-~'ill well scan, ~u~ DEAFt deh~t~ would be equal to 101.765' at t~ St~t,.qcan t-,pecQou Zon~ u stated above, These numbers ~re used t0 produce ·rmal sc~n rndl~ of 1629.412' wl~ch t~ 112.~41' I~$er 0~m DEAF'· d~fauitvalueof 816.471' Senn Parameters Comments: ,, At Ihb enlarg~:[ radi~ O~e following v,~l~ we. re ~ N~: ~{.~ {bt may n~ i~ciude all ~ w~ dct~, ~y BI-0i 799,52'MD 271.43 ' ~7.~ ' 2~,69 ' No Minor BI-ti 1598,59~ ,-;. 183,31 ' ~l.~ ~ 172A4 ' No M{~r BI-14 25~.21 ~D 303.89 ' 325,~ ' ~8,10 ' No Ml~r , , , BI.I~~ 2386.95 ~D 137.33" 3~.~ ' 123.33 ' No MI~r BI-16 Fbi 2386.~ ~ 137.31 ' 3~.20 BI.18 ~.~ - i14.17 ' 263.~ ' ~.10 ' No BI-21 ~75.05 ~ 89.93 ' ~3.50 ' 73,~ ' No Minor Dad~ml-01 4401.21 'MD ~7.56 ' 169.50 ' 297~2 ' No MI~t .... ,,, , , Tolerance Plot required: Close Approach Comments: Close Approach Scan Performed by~ ,~, ~. ~'~- / Date: ~;,..~- .... ~ ~ Checked by: ,,~,..~,~__. Approved by: FOR PERMITTING ONLY JLIN-22--98 ~ON 11'14 PlFI SPEI~ITY-$UN aLaSKa NO, 19P~5635754 ., P! O2 Badami Alaska State Plane Zone 3 Badami CPI= ~.~ wp4 PROPOSAL REPORT 20 May, 1998 Your Ref: B1.28 MLOH (Hole#l) Surface Coordinates: 5906425.00 N, 364025.63 E (70° 09' 08.0405' N, 147° 05' 36.3229" W) Proposal Ref: proS$ 11:14 SPEI Y-SUN L SKh NO, 19P' Bfi35754 P, 03 1500 Shared Services Drilling Well: 81-28 Wp4 I DrillQuest' : Slart Dir @ 1.C00'/10011: $00.00fl MD, $00.001l I'VD DIq Sail <~ 6.0<:)0'; ll00.00fl MD, 1098.9<:)ll TVD DIr ¢~ i.000Vl00ft: 1400.00fl MD, 1397.26fl TVD DIr, Sail O 0.000°; 2000.00It MD, 1986.161ITVD - , , Olr O 4.000°/100ft: 2360.00ll MD, 2346.16lt TVD Ball~ Permnfms( - 1955.10 I'VD 3000 "~ 4500 ,u_ 6000 7500 .- Il ~, 90oo 3200.00 [}ir, Sntl ~ 54000° c 3700,OOtt MD, 3505.001't TVD 3ilO0 O0 ,lO00.00 44C0.00 ,.oooo 9 5/8" Casing - 5486.54 MD, 4555.10 TVD 520ooo Tendency · 0.220'/100fl: 5486,54fl MD, 4556.lOftTVD 6000.00 8400.00 ~800.00 7200.00 8400.00 Top Mid Bror~klnn (TMBK) - 7())6.10 TVI 7" Casing - 11953.35 MD, 8935.10 TVD m r i i T 0 1500 3000 4500 6000 7500 Scale: I inch - 1500~t Vertical Section Section AzSmulh: 51.333' (True North) ~. 7" Casing- 11953,35 MD, 8935.10'FVD FOR PERMITTING ONLY ¢g . Start DIr O6.000'/100H: 11984.45fl MD, 8g60.O0ftl'VD ~ ' End Olr, Sail ~ 53.000'; 12271.06fl MD, 9162.70fl TVD 1~90o.oo' ,' ." . BHATendency ¢~ t.240c/10Otl: 12311.0611MO, g186.771tTVD "~ 9000 ~---...'. .... Shallowest Badaml Sand. ~035,10TVD :> "~" X f P"O.POSAL TARGET SUM~M___AR~Y =o 131~ o0 ~N. /Tmr~Gt ~m.: TVDSS I'VORKa: W.I~ O~tmmm,: a~,bml Coord~,i**: ,Inn~n --- ~ ~ ~ --F5- I0I?I.IOTVD MD~ 10705.10ft TVD { ~'~,~'g~.'~"~'";;,~,',i 4 1/2" Casing- 14329.42 MD, 10705.10 TV~ $[JRFACE LOCATION'- [ RgB El4vallc~; 35 30 fT RIg(EST} ' ,,,~,~'- ' _.~ 6750 8250 [ ~o.so, W., Ica~) --.,n---'T-'"--; ..... 7 Scale: linch ~ l$00ft Socflon Allmuth: 51.333° O'rue North) ICoord~r~l,$~n: NADP7 At-sl~ S~,l, Pta~,.. _ Vertical Section ~ z=..,oa, usF,~! n~,~,y ...................... JUN-22-98 11:14 At4 SPEPRY-SUN ~L~SK~ FAX NO, 19o'75635754 P, 04 Shared Services Drilling Well: B1-28 Wp4 I DrillQuest' 30C 10c II Scale: linch - 100Ofl -1000 I 1000 I 3900.O0 I .lO0O Scale;linch · 1000fl Eastings 2000 3000 4000 5000 I I I Slari DIr · 8.000'/100q: 11984.4511 MD, 8960.0Oll TVD 7' Casing - 11953.35 MD, 8935,10 TVD BHA Tendency O 1.000"/100fl; 11461.45f! MD, 8555.10ft TVD 830000 8000.00 6900.00 6200.00 "BHA Tendency · 0.220'/100ft: 548~.54ft MD, 4555.1 Oft TVD 9 5/8' Ca~ing - 5486.54 MD, 4555,10 'rVD 3500.00 ~ '3~'" End DIr, Sail e 54.000': 3700.00fl MD, 3505.O0ft 'I'VD .., · , . · . · . · :'"""'~,e~ O',; ~,.~/t~ =0~0~.6~ .~,~I~.~,~" ~O . . ,' End DIr, Sail O 6,000': 1100,00fl MD, 1098.90ft TVD "KOP: Starl DIr O 1.000~/lOOft · 500,00fl MD, 500.00ft TVD o 1 000 2000 Eastings I I I 3000 4000 5000 Reference Il True North - 2000 - 1000 -0 Eastings 550O 6500 I ! I BI'2a H('It #/ ' C~rcle I/°549'/°7'VD'S°66.28N'6376'76E~ I / ~.~ ~ 1/2" Cadiin.(:l - 14329.42 MD, 10705,10 TVD / [ ~t'" ' ' ]rotal Depth :1432e.42tt MD, 10705.10tl TVD 8300 ~1~ __ J 8HA Tendency O 1.240°/100ft: 12 4000 -- 9 ~oo (~.;.,.. - ~nd_DJr,_S~! ~ 53.000' ! !2271.06tt MI e?°°'°~", Start DIr ~ 6.000'/10Oft: 11984.45lt MO, ~ ~,/ 7" Casing - 11953.35 MD, 8935,1(:: e4~,~,. ".. BHATendencv ~ 1.000°/10Oft: 11481.45ftMD FOR PERMITTING ONLY PROPOSAL TARGET SUMMARY Tergel Nem. I: B I-2'8 Hole t I Clmle (3~O'Radlum) I'VD8 8 1YORKB: Wellhead Otftel,: aio{)&l Coo.:Hnalm~: IO4~4.O010540.105068.2~ N, 6378.78 E aG11378.O0 N, 370492.30 E SURFACE LOCATION C~o~k~ale Sy~lem:NA027 Alaska S~e P~a~m, Z,o,r,,e 3, US Foot I11.06ft MD, 9186.7711TVD - 4000 ,, 9162.70f! 3'VD B980.00{I 'TYD 'I'VD 8555.10fl TVD I I 5500 6500 Scale: linch = 100Oft Eastings Reference la True Norlh PLOT DATE: 5/20~98 Approved ~: ....................... Sperry-Sun Drilling Services Proposal Data - B1-28 - B1-28 Wp4 ITl O. x z c~ z Badami Measured Depth (ft) 0.00 100.00 200.00 300.00 400.00 500.00 600.00 700.00 800.00 900.00 1000.00 1100.00 1200.00 1300.00 1400.00 1500.00 1600.00 1700.00 1800.00 1900.00 1958.94 2000.00 2100.00 2200.00 2300.00 2350.00 2400.00 2500.00 2600.00 2700.00 Incl. o.ooo o.0oo o.ooo 0.0o0 o.ooo o.ooo 1 .ooo 2.000 3.000 4.000 5.000 6.000 6,0oo 6.ooo 6.ooo 5.000 4.ooo 3.ooo 2.000 1.ooo o.411 o.ooo o.ooo 0.ooo 0.o00 o.ooo 2.000 6.000 1 o.ooo 14.ooo o.ooo 0.0oo 0.0oo o.o0o o.ooo o.ooo 170.0o0 17o.ooo 17o.ooo 17o.ooo 17o.ooo 17o.ooo 17o.ooo 17o. ooo 17o.ooo 17o. ooo 17o. ooo 170.000 17o.ooo 17o.ooo 170.000 ooooo o.0oo o. ooo 0.0o0 o.ooo 56.000 56.000 56.000 56.000 Sub-Sea Depth (fi) -55.10 44.9O 144,90 244.90 344.90 444.90 544.89 644.86 744.76 844.58 944.27 1043.80 1143.26 1242.71 1342.16 1 441.70 1541.39 1641.20 1741.11 1841.07 1900.00 1941.06 2041.06 2141.06 2241.06 2291.06 2341.05 2440.79 2539.80 2637.59 Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings. Eastings (fi) Ct) 0.00 0.00 N 0.00 100.00 0.00 N 0.00 200.00 0.00 N 0.00 300.00 0.00 N 0.00 400.00 0.00 N 0.00 500.00 0.00 N 0.00 599.99 0.86 S 0.15 699.96 3.44 S 0.61 799.86 7.73 S 1.36 899.68 13.74 S 2.42 999.37 21.47 S 3.79 I098.90 30.91 S 5.45 1198.36 41.20 S 7,27 1297.81 51.50 S 9.08 1397.26 61.79 S 10.90 1496.80 71 ..23 S 12.56 1596.49 78.96 S 13.92 1696.30 84.97 S 14,98 1796.21 89.27 S 15,74 1896.17 91.84 S 16.19 1955.10 92.56 S 16.32 1996.16 92.70 $ 16.35 2096.16 92.70 S 16.35 2196.16 92.70 S 16.35 2296.16 92.70 S 16.35 2346.16 92.70 S 16.35 2396.15 92.21 S 17.07 2495.89 88.32 S 22.85 2594.90 80.53 S 34.39 2692.69 68.91 S 51.62 Proposal Report for B1-28 Wp4 Your Ref: B1-28 MLOH (Hole~l) FOR PERMtTflNG ONLY Alaska State Plane Zone 3 Badami CPF Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (~/'~ OOft) (ft) Comment E 5906425.00 N 364025.63 E 0.00 E 5906425.00 N 364025.63 E 0.000 0.00 E 5906425.00 N 364025.63 E 0.000 0.00 E 5906425.00 N 364025.63 E 0.000 0.00 E 5906425.00 N 364025.63 E 0.000 0.00 E 5906425.00 N 364025.63 E 0.000 0.00 E 5906424.14 N 3 64025.77 E 1.000 -0.42 E 5906421.55 N 364026.17 E 1.000 -1.67 E 5906417.24 N 364026.85 E 1.000 -3.77 E 5906411.21 N 364027.81 E 1.000 -6.70 E 5906403.46 N 364029.03 E 1.000 -10.46 E 5906394.00 N 364030.52 E 1.000 -15.06 E 5906383.67 N 364032.15 E 0.000 -20.07 E 5906373.35 N 364033.78 E 0.000 -25.09 E 5906363.02 N 364035.41 E 0.000 -30.10 E 5906353.55 N 364036.91 E 1.000 -34.70 E 5906345.80 N 364038.13 E 1.000 -38.46 E 5906339.77 N 364039.08 E 1.000 -41.39 E 5906335.47 N 364039.77 E 1.000 -43.48 E 5906332.88 N 364040.17 E 1.000 -44.74 E 5906332.16 N 364040.29 E 1.000 -45.09 E 5906332.02 N 364040.31 E 1.000 -45.16 E 5906332.02 N 364040.31 E 0.000 -45.16 E 5906332.02 N 364040.31 E 0.000 -45.16 E 5906332.02 N 364040.31 E 0.000 -45.16 E 5906332.02 N 364040.31 E 0.000 -4,5.16 E 5906332.49 N 364041.04 E 4.000 -44.29 E 5906336.29 N 364046.89 E 4.000 -37.34 E 5906343.86 N 364058.57 E 4.000 -23.47 E 5906355.17 N 364076.00 E 4.000 -2.75 KOP ' Start Dir @ 1.000°flO0ft ' 500.O0ft MD, 500.00ft TVD End Dir, Sail @ 6.000° - 1100.00ft MD, 1098.90ft 'I'VD Start Dir @ 1.000°/100ft- 1400.00ft MD, 1397.26ft TVD Base Permafrost End Dir, Sail @ 0.000° -2000.00ft MD, 1996.16ft TVD Start Dir @ 4.000°/100ft: 2350.00ft MD, 2346.16ft TVD Conb'nued... 22 June, 1998 - 8:11 I DrillQuest z Badami Measured Depth (ft) 2800.00 2900.00 3000.00 3100.00 3200.00 3300.00 3400.00 3500.00 3600.00 3700.00 3800.00 3900.00 4000.0O 4100.00 4200.00 4400.00 4500.00 4600.O0 4700.00 4800.00 4900.00 5000.00 5100.00 5200.00 5300.00 5400.00 5486.54 5500.00 5600.00 incl, 18.000 22.0o0 26.000 30.000 34.000 38.ooo 42,000 46.ooo 5o,oo0 54.000 54.000 54.000 54.o00 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.000 54.0O0 54.000 53.972 53.765 Azim. Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (fi) (fi) 56.000 2733.70 2788.80 53.50 S 74.47 E 56.000 2827.65 2882.75 34.38 S 102.82 E 56.000 291~B.98 2974.08 11.64 S 136.53 E 56.000 3007.26 3062.36 14.61 N 175.44 E 56.000 3092.05 3147.15 44.24 N 219.37 E 56.000 3172.93 3228.03 77.10 N 268.09 E 56.000 3249,52 3304.62 113.03 N 321.36 E 56,000 3321.44 3376.54 151.87 N 378.94 E 56.000 3388.34 3443,44 193.42 N 440.54 E 56,000 3449.90 3505,00 237.47 N 505.85 E 56.000 3508.67 3563.77 282.71 N 572.93 E 56,000 3567.45 3622,55 327.95 N 640.00 E 56,000 3626.23 3681,33 373.19 N 707.07 E 56.000 3685.01 3740,11 418.43 N 774.14 E 56.000 3743.79 3798.89 463.67 N 841.21 E 56.000 3802.57 3857.67 508.91 N 908.28 E 56.000 3861.35 3916.45 554.15 N 975.35 E 56.000 3920.12 3975.22 599.39 N 1042.42 E 56.000 3978.90 4034.00 644.63 N 1109.49 E 56.000 4037.68 4092.78 689,87 N 1176,56 E 56.000 4096.46 4151.56 735.11 N 1243,63 E 56.000 4155.24 4210.34 780.35 N 1310.70 E 56.000 4214.02 4269.12 825.59 N 1377.77 E 56.000 4272.80 4327.90 870.83 N 1444.84 E 56.000 4331.57 4386.67 916.07 N 1511.91 E 56.000 4390.35 4445.45 961.31 N 1578.98 E 56.000 4449.13 4504.23 1006.55 N 1646.05 E 56.000 4500.00 4555.10 1045.70 N 1704.10 E 55.987 4507.91 4563.01 1051.79 N 1713_12 E 55.894 4566.88 4621.98 1097.02 N 1780.03 E Proposal Report for B1-28 Wp4 Your Ref: B1-2a MLOH (Holef~l) FOR PERMITTING ONLY Alaska State Plane Zone 3 Badami CPF Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (fl) (°/100ft) (fi) Comment 5906370.17 N 364099.12 E 4.000 24.72 5906388,78 N 364127.81 E 4.000 58.80 5906410,91 N 364161.93 E 4.000 99.33 5906436.46 N 364201.31 E 4.000 146.11 5906465.29 N 364245.75 E 4.000 198.92 5906497.27 N 364295.06 E 4.000 257.49 5906532.25 N 364348.97 E 4.000 321.54 5906570.04 N 364407.24 E 4.000 390.76 5906610.48 N 364469.57 E 4.000 464.82 5906653.36 N 364535.67 E 4.000 543.34 5906697.39 N 364603.54 E 0.000 623.97 5906741.41 N 364671.41 E 0.000 704.61 5906785.44 N 364739.28 E 0.000 785.24 5906829.47 N 364807.15 E 0.000 865.87 5906873.50 N 364875.02 E 0.000 946.51 5906917.53 N 364942.90 E 0.000 1027.14 5906961.56 N 365010.77 E 0.000 1107.77 5907005.58 N 365078.64 E 0.000 1188.41 5907049.61 N 365146.51 E 0.000 1269.04 5907093.64 N 365214.38 E 0.000 1349.67 5907137.67 N 365282.26 E 0.000 1430.31 5907181.70 N 365350.13 E 0.000 1510.94 5907225.73 N 365418.00 E 0.000 1591.57 5907269.76 N 365485.87 E 0.000 1672.21 5907313.78 N 365553.74 E 0.000 1752.84 5907357.81 N 365621.61 E 0.000 1833.47 5907401.84 N 365689.49 E 0.000 1914.11 5907439.94 N 365748.22 E 0.000 1983.89 5907445.87 N 365757.36 E 0.220 1994.74 5907489.89 N 365825.07 E 0.220 2075.25 End Dir, Sail @ 54.000°' 3700.00fl MD, 3505.00ft 'rVD BHA Tendency @ 0.220°/100ft - 5486.5411 MD, 4555.10ft TVD 9 5/8' Casing Continued... ~-~ 22 June, 1998 - 8:11 - 2 - DrillQuest z o Badami Measured Depth (ft) 5700.0O 5800.00 5900.00 6000.00 6100.00 6200.00 6300.00 6400.00 6500.00 6600.00 6700.00 6800.00 6900.00 7000.00 7100.00 7200.00 7300.00 7400.00 7500.00 7600.00 7700.00 7800.00 7900.00 8000.00 8100.00 8200.00 8300.00 8400.00 8500.00 8600.00 Incl. 53.559 53.352 53.146 52.939 52.733 52.527 52.321 52.115 51.909 51.703 51.497 51.291 51.086 50.880 50.674 50.469 50.264 50.059 49.853 49.648 49.443 49.239 49.034 48.829 48.625 48.420 48.216 48.012 47.808 47.603 Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (ft) (ft) (ft) 55.800 4626.13 4681.23 1142.24 N 1846.70 E 55.706 4685.67 4740.77 1187.46 N 1913.11 E 55.611 4745.51 4800.61 1232.66 N 1979.26 E 55.516 4805.63 4860.73 1277.84 N 2045.17 E 55.420 4866.04 4921.14 1323.02 N 2110.82 E 55,324 4926.74 4981.84 1368.18 N 2176.22 E 55.227 4987.72 5042.82 1413.32 N 2241.35 E 55.129 5048.98 5104.08 1458.46 N 2306.24 E 55.031 5110.53 5165.63 1503.57 N 2370.86 E 54.933 5172.37 5227.47 1548.67 N 2435.22 E 54.834 5234.48 5289.58 1593.75 N 2499.33 E 54.734 5296.88 5351.98 1638.81 N 2563.17 E 54.634 5359.55 5414.65 1683.86 N 2626.75 E 54,533 5422.51 5477.61 1728.89 N 2690.07 E 54.431 5485.74 5540.84 1773.89 N 2753.13 E 54.329 5549.25 5604.35 1818.88 N 2815.92 E 54.227 5613.04 5668.14 1863.84 N 2878.44 E 54.123 5677.10 5732.20 1908.78 N 2940.70 E 54.020 5741.44 5796.54 1953.71 N 3002.69 E 53.915 5806.05 5861.15 1998.60 N 3064.41 E 53.810 5870.94 5926.04 2043.48 N 3125.87 E 53.704 5936.09 5991.19 2088.33 N 3187.05 E 53.598 6001.52 6056.62 2133.15 N 3247.96 E 53.491 6067.21 6122.31 2177.95 N 3308.60 E 53.383 6133.18 6188.28 2222.72 N 3368.97 E 53.274 6199.41 6254.51 2267.46 N 3429.06 E 53.165 6265.91 6321.01 2312.18 N 3488.88 E 53.055 6332.68 6387.78 2356.87 N 3548.42 E 52.945 6399.71 6454.81 2401.53 N 3607.68 E 52.834 6467.00 6522.10 2446.16 N 3666.67 E Proposal Report for 81-28 Wp4 Your Ref: 81-28 MLOH (Holef/1) FOR PERMI1'T, ING ONLY Global Coordinates Dogleg Vertical Northings Easfings Rate Section (ft) (ft) (°/100ft) (ft) 5907533.91 N 365892.53 E 0.220 2155.55 5907577.93 N 365959.74 E 0.220 2235.65 5907621.93 N 366026.70 E 0.220 2315.55 5907665.93 N 366093.41 E 0.220 2395.24 5907709.92 N 366159.86 E 0.220 2474.72 5907753.90 N 366226.05 E 0.220 2554.00 5907797.87 N 366291.99 E 0.220 26,33.06 5907841.82 N 366357.67 E 0.220 2711.92 5907885.77 N 366423.10 E 0.220 2790.56 5907929.71 N 366488.26 E 0.220 2869.00 5907973.63 N 366553.16 E 0.220 2947.22 5908017.54 N 366617.80 E 0.220 3025.22 5908061.44 N 366682.18 E 0.220 3103.01 5908105.32 N 366746.30 E 0.220 3180.58 5908149.19 N 366810.15 E 0.220 3257.93 5908193.04 N 366873.74 E 0.220 3335.06 5908236.88 N 366937.06 E 0.220 3411.98 5908280.69 N 367000.12 E 0.220 3488.67 5908324.49 N 367062.90 E 0.220 3565.13 5908368.28 N 367125.42 E 0.220 3641.38 5908412.04 N 367187.67 E 0.220 3717.40 5908455.78 N 367249.65 E 0.220 3793.19 5908499.51 N 367311.36 E 0.220 3868.75 590854321 N 367372.79 E 0.220 3944.09 5908586.89 N 367433.95 E 0.220 4019.20 5908630.55 N 367494.84 E 0.220 4094.07 5908674.19 N 367555.45 E 0.220 4168.72 5908717.80 N 367615.78 E 0.220 4243.13 5908761.39 N 367675.84 E 0.220 4317.30 5908804.95 N 367735.62 E 0.220 4391.25 Comment Alaska State Plane Zone 3 Badami CPF Conb'nued... 22 June, 1998 - 8:11 - 3 - DrlllOuest o co i i z Badami Measured Depth (ft) 8700.00 8800,00 8900.00 9000.00 9100.00 9200.00 9300,O0 9380.23 9400.00 9500.00 9600.00 9700.00 9800.00 9900.00 10000.00 10100.00 10200.00 10300.00 10400,00 10500.00 10600.00 10700.00 10800.00 10900.00 10955.59 11000.00 11100.00 11200.00 11300.00 11340.46 Incl. 47.400 47.196 46.992 46,788 46.585 46.382 46.178 46.015 45.975 45.772 45.569 45.367 45.164 44.962 44.759 44.557 44.355 44.153 43.951 43.749 43.548 43.346 43.145 42.944 42.832 42.743 42.542 42.342 42.141 42.060 22June, 1998-8:11 AzJm, Sub-Sea Depth (ft) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings Eastings (fi) (ft) (ft) 52.722 6534.56 6589,66 2490.76 N 3725.38 E 52.609 6602.38 6657.48 2535.33N 3783.81 E 52.496 6670.46 6725.56 2579.86N 3841.97 E 52.381 6738.80 6793,90 2624.37 N 3899.84 E 52.266 6807.39 6862.49 2668.84N 3957.43E 52.151 6876.25 6931.35 271328 N 4014,73 E 52.034 6945.36 7000.46 2757,68N 4071.76 E 51.940 7001.00 7056,10 2793.28N 4117.30 E 51.917 7014.73 7069.83 2802,05 N 4128.49 E 51.799 7084.36 7139.46 2846.38N 4184.95 E 51.680 7154.24 7209.34 2890.68N 4241.12 E 51.560 7224,37 7279.47 2934.94N 4297.00 E 51.439 7294.75 7349.85 2979.16 N 4352.59 E 51.318 7365.38 7420.48 3023,35N 4407.90 E 51.195 7436,27 7491,37 3067,49 N 4462.92 E 51.072 7507.40 7562.50 3111_60N 4517,64E 50.948 7578.78 7633.88 3155.66 N 4572,08 E 50.823 7650.40 7705.50 3199.69 N 4626.22 E 50.697 7722.27 7777.37 3243.67N 4680.07 E 50.570 7794.39 7849.49 3287.61 N 4733.63 E 50.442 7866.75 7921.85 3331.51 N 4786.90 E 50.314 7939.35 7994.45 3375.36N 4839.87 E 50.184 8012.19 8067.29 3419.17 N 4892.54 E 50.053 8085.27 8140.37 3462.94N 4944.92 E 49.980 8126.00 8181.10 3487.25 N 4973.91 E 49.922 8158.59 8213.69 3506,66 N 4997.00 E 49.789 8232.15 8287.25 3550.34N 5048.79 E 49.655 8305.95 8361.05 3593,96 N 5100.27 E 49.521 8379.98 8435,08 3637.54N 5151.46 E 49.466 8410.00 8465.10 3655.16 N 5172.08 E Proposal Report for B 1-28 Wp4 Your Ref: B1-28 MLOH (Hole#l) FOR PERMITTING ON,.LY Global Coordinates Dogleg Vertical Northings Eastings Rate Section (fi) (it) (°tlOOft) (ft) 5908848.49 N 367795.12 E 0.220 4464.95 5908892.00 N 367854.34 E 0.220 4538.42 5908935.49N 367913.28 E 0,220 4611.65 5908978.95 N 367971.94 E 0.220 4684,64 5909022.38N 368030.32 E 0.220 4757.39 5909065.78 N 368088.42 E 0.220 4829.90 5909109.15 N 368146.23 E 0,220 4902.17 5909143.93 N 368192.41 E 0.220 4959.97 5909152.49 N 368203,76 E 0.220 4974.19 5909195.81 N 368261.00 E 0.220 5045.97 5909239.09 N 368317.95 E 0.220 5117.50 5909282.34N 368374.62 E 0.220 5188.79 5909325.56 N 368431.00 E 0.220 5259.82 5909368.74N 368487.09 E 0.220 5330.61 5909411.89 N 368542.89 E 0.220 5401.15 5909455.01 N 368598.40 E 0.220 5471.44 5909498.09 N 368653.61 E 0.220 5541.47 5909541.13 N 368708.54E 0.220 5611.25 5909584.14 N 368763.17 E 0.220 5680.78 5909627.11 N 368817.51 E 0.220 5750.05 5909670.05 N 368871.56 E 0.220 5819.07 5909712.95 N 368925.30 E 0.220 5887,83 5909755.80 N 368978.76 E 0.220 5956.33 5909798.62 N 369031.91 E 0.220 6024.57 5909822.41 N 369061.33 E 0.220 6062.39 5909841.40 N 369084.77 E 0.220 6092.55 5909884.14 N 369137.33 E 0.220 6160.27 5909926.84 N 369189.59 E 0.220 6227.73 5909969.49 N 369241.55 E 0.220 6294.92 5909986.74 N 369262.49 E 0.220 6322.03 Comment Top Mid Brook, lan ('I'MBI0 M90 Base West Sak (M85) Alaska State Plane Zone 3 Badami CPF Continued... DrillQuest o ,.>__. c:o i Badami Measured Depth (ft) 11400.00 11461.45 11500.00 11600.00 11700.00 11800.00 11900.00 11953.35 11984.45 120O0.00 12081.69 12100.00 12200.00 12271.06 12300.00 12311.06 12400.00 12500.00 12600.00 12700.0O 12800.00 12900.00 13000.00 13100.0~ 13200.00 13300.00 13400.00 13461.29 13500.00 13600.00 Incl. 41.941 41.818 41.438 40.454 39.470 38.487 37,505 36,982 36.676 37.546 42.152 43.193 48.909 53.000 53.000 53.000 51.912 50.690 49.467 48,246 47,025 45.806 44.587 43.368 42.151 40,935 39.721 38.977 38.507 37.295 Azim. Sub-Sea Depth (fi) Sperry-Sun Drilling Services Vertical Local Coordinates Depth Northings- Eastings (ft) (ft) (fi) 49.385 8454,25 8509.35 3681.08 N 5202.34E 49.301 8500.00 8555.10 3707.80 N 5233.46 E 49.200 8528.81 8583.91 3724.52 N 5252.86 E 48.930 8604,35 8659.45 3767.46 N 5302.37 E 48.650 8680.99 8736.09 3809.77N 5350.69 E 48.357 8758.73 8813.83 3851.45N 5397.81E 48.051 8837.53 8892.63 3892.47N 5443.70 E 47.883 8880.00 8935.10 3914.09 N 5467.68 E 47.782 8904,90 8960.00 3926.61N 5481.50 E 47.223 8917.30 8972.40 3932.94 N 5488.42E 44,606 8980.00 9035.10 3969.39 N 5525.96 E 44,084 8993.46 9048.56 3978.26 N 5534.63 E 41.546 9062.84 9117.94 4031.10 N 5583.48E 40.000 9107.60 9162.70 4072.90 N 5619.50 E 40.000 9125.02 9180.12 4090.60 N 5634.35 E 40.000 9131.67 9186.77 4097.37 N 5640.03 E 39.773 9185.87 9240.97 4151_47 N 5685.25 E 39.510 9248.39 9303.49 4211.57N 5735.04 E 39.238 9312.56 9367.66 4270.85 N 5783.70 E 38,955 9378.36 9433.46 4329.29 N 5831.19 E 38.662 9445.74 9500.84 4386.87 N 5877_49 E 38.356 9514.68 9569.78 4443.55 N 5922.60 E 38.038 9585.15 9640.25 4499.31 N 5966.47 E 37.705 9657.11 9712.21 4554.12 N 6009.10 E 37.358 9730.53 9785.63 4607.95 N 6050.46 E 36.993 9805.37 9860.47 4660.79 N 6090.53E 36.611 9881.60 9936.70 4712.61 N 6129.30 E 36.366 9929.00 9984.10 4743.85 N 6152.41 E 36.208 9959.19 10014.29 4763.38 N 6166.75 E 35.783 10038.10 10093.20 4813.08 N 6202.86 E Proposal Report for B1-28 Wp4 Your Ref: B1-28 MLOH (Holet/1) FOP, PERM!~ING Alaska State Plane Zone 3 Badami CPF Global Coordinates Dogleg Vertical Northings Eastings Rate Section (/1) (ft) (°/100ft) (fi) Comment 591oo12.1o N 369293.21 E 0,220 6361.85 5910038.27 N 369324.80 E 0.220 6402.85 5910054.63N 369344.50 E 1.000 6428.44 5910096.67N 369394.77E 1.000 6493.92 5910138.11 N 369443.84E 1.000 6558.09 5910178.94N 369491.70 E 1.000 6620.91 5910219.13 N 369538.32 E 1.000 6682.38 5910240.32N 369562.69 E 1.000 6714.61 5910252.58N 369576.73 E 1.000 6733.22 5910258.80 N 369583.76 E 6.000 6742.58 5910294.56 N 369621.95 E 6.000 6794.66 591030328 N 369630.78 E 6.000 6806.98 5910355.23N 369680.57 E 6.000 6878.13 5910396.37 N 369717.33 E 6.000 6932.37 5910413.81 N 369732.50 E 0.000 6955.03 5910420.47 N 369738.30 E 0.000 6963.69 5910473.76 N 369784.48E 1.240 7032.80 5910532.95 N 369835.35 E 1.240 7109.23 5910591.35N 369885.05E 1.240 7184.25 5910648.93 N 369933.59 E 1.240 7257.85 5910705.66 N 369980.92 E 1.240 7329.98 5910761.52 N 370027.03 E 1.240 7400.60 5910816.49 N 370071.90 E 1.240 7469.70 5910870.52 N 370115.50 E 1.240 7537.23 5910923.61 N 370157.83 E 1.240 7603.16 5910975.72 N 370198.84 E 1.240 7667.46 5911026.83 N 370238.54E 1.240 7730.11 5911057.65 N 370262.20 E 1.240 7767,67 5911076.92 N 370276.89 E 1.240 7791.07 5911125.96 N 370313.88 E 1.240 7850.31  .oHA~end. ency @ 1,000°/100ft· 11461.45ff MD, 8555.10ft TVD p c;anmng 7' Casing Start Di[ @ 6.000°/100ft' 11984.45ft MD, 8960.00ft TVD Shallowest Badarni Sand End Dir, Sail @ 53.000° ' 12271.06fi MD, 9162.70ft 'rVD BHA Tendency @ 1.240°/100ft' 12311.06ft MD, 9186.77ff TVD Continued... ~-~ 22 June, 1998 - 8:11 - 5 - DrillQuest Badami Sperry-Sun Drilling Services Proposal Report for B1-28 Wp4 Your Ref: B1-28 MLOH (Hole#l) FOR PERMITT!NG ONLY Alaska State Plane Zone 3 Badami CPF o .>--- cO I Measured Sub-Sea Vertical Local Coordinates Depth Incl. Azim. Depth Depth Northings Eastings (ft) (ft) (ft) (ft) (ft) 13700.00 36.085 35.334 10118.28 10173.38 4861.68 N 6237.60 E 13715.71 35.895 35.261 10131.00 10186.10 4869.22 N 6242.94 E 13800.00 34.876 34.858 10199.71 10254.81 4909.17 N 6270.98 E 13880.33 33.907 34.455 10266.00 10321.10 4946.49 N 6296.78 E 13900.00 33.669 34.353 10282.35 10337.45 4955.51 N 6302.96 E 14000.00 32.465 33.815 10366.15 10421,25 5000.70 N 6333.54 E 14062.38 31.715 33.460 10419.00 10474.10 5028.29 N 6351.90 E 14100.00 31.263 33.239 10451.08 10506.18 5044.70 N 6362.70 E 14115.10 31.082 33.149 10464.00 10519.10 5051.24 N 6366.98 E 14150.05 30.662 32.936 10494.00 10549.10 5066-28 N 6376.76 E 14200.00 30.051 32.736 10537.10 10592.20 5087.49 N 6390.45 E 14300.00 28.829 32.312 10624.19 10679.29 5128.93 N 6416.88 E 14329.42 28.470 32.181 10650.00 10705.10 5140.85 N 6424.40 E Global Coordinates Dogleg Vertical Northings Eastings Rate Section (ft) (ft) (°/lOOft) (ft) 5911173.93 N 370349.49 E 1.240 7907.80 5911181.37 N 370354.96 E 1.240 7916.68 5911220.81 N 370383.71 E 1.240 7963.53 5911257.66 N 370410.18 E 1.240 8007.00 5911266.58 N 370416.53 E 1-240 8017.46 5911311.21 N 370447.91 E 1.240 8069.57 5911338.46 N 370466.76 E 1-240 8101.14 5911354.68 N 370477.86 E 1-240 8119.83 5911361.14 N 370482.25 E 1.240 8127.26 5911376.00 N 370492.30 E 1.240 8144.29 5911396.96 N 370506.37 E 1.240 8168.23 5911437.92 N 3705,33.54 E 1.240 8214.75 5911449.71 N 370541.27 E 1.240 8228.08 Ail data is in feet unless otherwise stated. Directions and coordinates are relative to True North. Vertical depths are relative to Well Reference. Northings and Eastings are relative to Well Reference. · The Dogleg Severity is in Degrees per 100ft. "Vertical Section is from Well Reference and calculated along an Azimuth of 51.333° (True). Based upon Minimum Curvature type calculations, at a Measured Depth of 14329.42ft., The Bottom Hole Displacement is 8228.08ft., in the Direction of 51.333° (True). Comment F3 F4 F5 A5 Target: B1-28 Hole #1,300.00 Radius., GeoiogicaJ Total Depth - 14329.42ft MD, 10705.10ft 'I'VD 4 1/2' Lifter ~-~ 22 June, 1998 - 8:11 - 6 - DrillQuest H ~37~70 I o^-r~ o.~o~.o. I 04/24/98 1001371701 · VENDOR ALASKAST i 4 O0 DATE INVOICE / CREDIT MEMO DESCRIPTION GROSS DISCOUNT NET 0422r---/8 CKO42298E i00_ O0 i00. O0 HANDLINC- INST- S/H KATHY CAMPOAldOR X 5122 · WELL PERMIT CHECKLIST COMPANY I'~ ~ WELL NAME )3 ~ ~ ~,,,.; ~ f-2,~ Z. f PROGRAM: exp [] dev I~-edrll [] serv [] wellbore seg,~ann, disposal para req II FIELD & POOL INIT CLASS GEOL AREA ~ ~,,O UNIT# ! (_'3 _:A_ ("/ff ON/OFF SHORE ADMINISTRATION 1. . 3. 4. 5. 6. 7. 8. 9. 10. 11. DATE n 12. Permit fee attached ....................... Lease number appropriate ................... Unique well name and number .................. Well located in a defined pool .................. Well located proper distance from drilling unit boundary .... Well located proper distance from other wells .......... Sufficient acreage available in drilling unit ............ If deviated, is wellbore plat included ............... Operator only affected party ................... Operator has appropriate bond in force ............. Permit can be issued without conservation order ........ Permit can be issued without administrative approval ...... Can permit be approved before 15-day wait ........... ENGINEERING GEOLOGY 14. Conductor string provided ................... 15. Surface casing protects all known USDWs ........... 16. CMT vol adequate to circulate on conductor & surf csg ..... 17. CMT vol adequate to tie-in long string to surf csg ........ 18. CMT will cover all known productive horizons .......... 19. Casing designs adequate for C, T, B & permafrost ....... 20. Adequate tankage or reserve pit ................. 21. If a re-drill, has a 10-403 for abandonment been approved... 22. Adequate wellbore separation proposed ............. 23. If diverter required, does it meet regulations .......... 24. Drilling fluid program schematic & equip list adequate ..... 25. BOPEs, do they meet regulation ........ . ........ 26. BOPE press rating appropriate; test to ..~'OO("_) psig. 27. Choke manifold complies w/APl RP-53 (May 84) ........ 28. Work will occur without operation shutdown ........... 29. Is presence of H2S gas probable ................. .~...,,_,,---~ 30. Permit can be issued WIG hydrogen sul~... 31. Data presented on potential?.~..er. Cmc's~d'~e zones ....... 32. Seismic analysis~ gas zones ............. 33. Seabed~survey (if off-shore) ............. 34. C~..,. weekly progress reports ....... exploratory only] APPR DATE . ANNULAR DISPOSAL 35. APPR DATE (~ N N N N · N (~ N (~N N N N N Y ~ Y N Y ~ Y N Y ~ Y N Y N ' Y N Y N With proper cementing records, this plan (A) will contain waste in a suitable receiving zone; ....... Y N (B) will not contaminate freshwater; or cause drilling waste. ·. Y N to surface; (C) will not impair mechanical integrity of the well used for disposal; Y N (D) will not damage producing formation or impair recovery from a Y N pool; and (E) will not circumvent 20 AAC 25.252 or 20 AAC 25.412. Y N GEOLOGY: E N G I N E_E~_I_N_ G: UIC/Annular COMMISSION: Comments/Instructions: M:chelilist rev 05~29~98 dlf:C:\msoffice\wordian\diarm\ch(xfldist