Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation Commission
Loading...
HomeMy WebLinkAbout169-009STATE OF ALASKA
,LASKA OIL AND GAS CONSERVATION G. ..MISSION
REPORT OF SUNDRY WELL OPERATIONS
JUL 2 9 2019
€' rte, f> r-.
Y--
1. Operations Abandon LJ Plug Perforations L Fracture Stimulate L Pull Tubing Li Operations shutdown Li
Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑� Alter Casing ❑ Change Approved Program ❑
Plug for Reddll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Oil Safe AR Q
2. Operator
4. Well Class Before Work:
5. Permit to Drill Number:
Name: Hilcorp Alaska, LLC
Development ❑ Exploratory ❑
Stratigraphic ❑ Service
169-009
3. Address: 3800 Centerpoint Drive, Suite 1400
6. API Number:
Anchorage, AK 99503
50-733-20173-00-00
7. Property Designation (Lease Number):
8. Well Name and Number:
�
ADL0018761 /�'��GFS/�%`f'L /� ���� �%
Granite Pt St 18761 MUCI-1
9. Logs (List ogs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
Granite Point Field / Middle Kenai Oil Pool
11. Present Well Condition Summary:
Total Depth measured 15,715 feet Plugs measured N/A feet
true vertical 14,431 feet Junk measured N/A feet
Effective Depth measured 11,219 feet Packer measured 10,158 feet
true vertical 10,066 feet true vertical 9,035 feet
Casing Length Size MD TVD Burst Collapse
Conductor 229' 33" 229' 229'
Structural 381' 24" 381' 381'
Structural 437' 18" 437' 437'
Surface 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi
Intermediate 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi
Production 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi
Liner 1,130' 5" 11,222' 10,069' 9,910 psi 10,490 psi
Perforation depth Measured depth 10,535 - 11,216 feet
True Vertical depth 9,402 - 10,064 feet
3-1/2" 9.2# / N-80 10,078 (MD) 8,958 (TVD)
Tubing (size, grade, measured and true vertical depth) 2-3/8" 4.7# / N-80 10,224 (MD) 9,099 (TVD)
10,158 (MD)
Packers and SSSV (type, measured and true vertical depth) Otis WB Perm Pkr 9,035 (TVD) SSSV: N/A
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
N/A - well pressured up and wouldn't take fluid
Treatment descriptions including volumes used and final pressure:
26 gallons of Safe Acid, final pressure 750#
13. Representative Daily Average Production or Injection Data
Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0 0 0 578 1 0
Subsequent to operation: 0 0 0 633 1 326
14. Attachments (required ver 20 AAc 25.070, 25.071, 825.283)
15. Well Class after work:
Daily Report of Well Operations 21
Exploratory ❑ Development ❑ Service Stratigraphic ❑
Copies of Logs and Surveys Run ❑
16. Well Status after work: Oil Gas WDSPL
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
319-304
Authorized Name: Stan W. Golis Contact Name: Dan Marlowe
Authorized Title: Operations Manager Contact Email: dmarlOWe(Qit111COfD.
pro
Authorized Signature: f l,. Date: Zr') Contact Phone: (907) 283-1329
uLA rJ
Form 1004 Revised 4/2017 Y' if `! -Sub
RBDMS�UL 312019 mit orriginal Only n19
,�
K
mre Alaska, LLC
RKB to tubing hanger= 38', RKB to MLLW =106
PBTD: 11,219' TD. 15,715'
SCHEMATIC
CASING DETAIL
Granite Point Field
Well: Granite Pt St 18761 MUCI-1
Last Completed: 11/27/1984
PTD: 169-009
API: 50-733-20173-00
Size
Wt
Grade
I Conn
ID
Top
Btm
33"
38'
Top (TVD)
Driven
OCT Tubing Hanger
Surf
229'
24"
157.5
B
XA Sleeve
22.75
Surf
381'
18"
70.5#
X -Over 3-1/2" x 2-3/8"
Vetco
Thread
10,158'
Surf
437'
13-3/8"
61#
1-55
Butt
12.515
Surf
5,628' (TOW)
Btm of Mule shoe
40#
N-80
Butt&
LTC
8.835
Surf
4,963'
9-5/8"
43.5#
N-80
LTC
8.755
4,963'
7,259'
10,224'
47#
S-95
ST&C
8.681
7,259'
11,257'
5"
18#
N-80
B2t/FL4S
4.276
10,092'
11,222'
11,186'
23#
1 N-80
Butt
6.366
Surf
6,693'
7"
26#
N-80
Butt
6.276
6,693'
9,186'
29#
N-80
X -Line
6.184
9,186'
11,234'
TUBING DETAIL
3-1/2" 9.2# N-80 Butt 2.992 Surf 10,078'
2-3/8" 4.7# N-80 Butt 1.995 10,078' 10,224'
JEWELRY DETAIL
No
Depth
(MD)
Depth
(TVD)
ID
OD
Item
'one
38'
38'
Top (TVD)
Btrn (TVD)
OCT Tubing Hanger
1
±10,047'
±8,991'
10,635'
9,402'
XA Sleeve
100'
10,078'
81958'
10,660'
10,705'
X -Over 3-1/2" x 2-3/8"
2
10,158'
9,035'
2.55
4.11
Otis "WB" Perm Packer w/Seal Bore Ext
3
10,176'
9,053'
1.94
2.52
Btm of Mule shoe
4
10,178'
9,055'
1.994
3.875
X -Over 3-1/2" x 2-3/8"
5
10,192
9,068
1.875
3.09
Otis "X" Nipple
6
10,224'
9,099'
2.00
4.00
WLREG
Updated By: JLL 05/24/19
PERFORATION DETAIL
'one
Top (MD)
Btm (MD)
Top (TVD)
Btrn (TVD)
FT
Date Status
Zone
10,535'
10,635'
9,402'
9,499'
100'
Nov -84
Zone
10,660'
10,705'
9,524'
9,567'
45'
Nov -84
Zone
10,735'
10,785'
9,596'
9,645'
50,
Nov -84
Zone
10,815'
10,825'
9,674'
9,684'
30'
Nov -84
Zone
10,841'
10,851'
9,699'
9,709'
10'
Nov -84
Zone
11,050'
11,075'
9,902'
9,927'
25'
Nov -84
Zone
11,100'
11,145'
9,951'
9,995'
45'
Nov -84
Zone
11,186'
11,216'
10,034'
10,064'
30'
Nov -84
Updated By: JLL 05/24/19
Hilcorp Alaska, LLC
Well Operations Summary
Well Name
Rig
API Number
Well Permit Number
Start Date End Date
Granite Pt St 18761 MUCI-1
Slickline
I SO -733-20173-00-00
1 169-009
7/4/19 1 7/5/19
Daily Operations:
07/04/19 - Thursday
Spot 2 totes of Safe acid and rig up hoses to top of tree utilizing the vacuum on the well to feed the acid into MUCI-1.
Open valve on tote to well, approx. 120 gal pulled into well in 6 minutes then vacuum is lost. Shut-in well. Open well
reestablish flow, allow well to take acid for 1 hour, only takes 15 gal. Shut-in well. Rig down hoses. Rig up centrifugal
pump and begin pumping into well. Well takes 5 gal and pressures up to pump max of 30psi in 30 minutes. Shut-in well.
Rig up high pressure chemical pump and begin pumping into well. Pressure increases from 30psi to 750psi within the
first hour and only takes approx. 1 gal acid. Continue to pump overnight.
07/05/19 - Friday
Well shut-in to allow pressure to decrease 560# @ 20:00.
THE STATE
°fALASKA
GOVERNOR MIKE DUNLEAVY
Stan W. Golis
Operations Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Alaska Oil and Gas
Conservation Commission
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www, aogcc.oioska.gov
Re: Granite Point Field, Middle Kenai Oil Pool, Granite Pt St 18761 MUCI-1
Permit to Drill Number: 169-009
Sundry Number: 319-304
Dear Mr. Golis:
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Daniel T. Seamount, Jr.
Commissioner -1
DATED this � day of July, 2019.
RBDMS�6/JUL Q Z 200
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
9n AA('. 95 9Rn
REEIVIE
JUN 2 0 ti019
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ AC)GGQhutd.wnE1
Suspend ❑ Perforate ❑ Other Stimulate ❑Q Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Oil Safe AR Q
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
Hilcorp Alaska, LLC
Exploratory ❑ Development ❑
Stratigraphic ❑ Service Q
169-009
3. Address: 3800 Centerpoint Drive, Suite 1400
6. API Number:
Anchorage, AK 99503
50-733-20173-00-00 r
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? N/A
Will planned perforations require a spacing exception? Yes ❑ No ❑± '
Granite Pt St 18761 MUCI-1 r
9. Property Designation (Lease Numherl' 10. Field/Pool(s):
ADL0018761 4.p L— i t:J� 771 A 'P/' r Granite Point Field /Middle Kenai Oil Pool
11. / PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
15,715 14,431 11,219 10,066 1,613 psi N/A WA
Casing Length Size MD TVD Burst Collapse
Conductor 229' 33" 229' 229'
Structural 381' 24" 381' 381'
Structural 437' 18" 437' 437'
Surface 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi
Intermediate 11,257' 9-5/8" 1 11,257' 10,103' 5,750 psi 3,090 psi
Production 11,234' 7" 11,234' 110,081' 6,340 psi 3,830 psi
Liner 1,130' 5" 11,222' 1 10,069' 9,910 psi 10,490 psi
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
10,535 - 11,216
9,402 - 10,064
3-1/2" & 2-3/8"
9.2# / N-80 & 4.7# N-80
10,078 & 10,224
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
Otis "WB" Perm Packer & N/A
10,158 (MD) 19,035 (TVD) & NA
12. Attachments: Proposal Summary 0 Wellbore schematic Q
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Strati ra hic ❑
g p ❑ Development ❑ Service
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations: 7/5/2019
OIL ❑ WINJ Q WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Dale:
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Stan W. Golfs Contact Name: Dan Marlowe
Authorized Title: Operations Manager Contact Email: dmarlowe hilcor .Com
u Contact Phone: (907) 283-1329
� �
Authorized signature: Date: L 7,L)I \
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number: n l O
!J�
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
RBDMS4A/JUL 0 21019
Post Initial Injection MIT Req'd? Yes ❑ No ❑
Spacing Exception Required? Yes ❑ No Subsequent Form Required: / h [�
APPROVED BY 7 I
Approved by:
COMMISSIONER THE COMMISSION Date:
�i ,�/{�•" e9121 ov'Zif ` �1 \ V A SubmH Form ane
Form lt>pfOs Revisetl ! 0 Approved application is al 1 fi`T n/I rine ate of approval. Attachments in Duplicate
V ���/r ':PIZ$ 4;l*E9
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25 280
JUN 2 0 6019
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ACM;ia hutdown ❑
Suspend ❑ Perforate ❑ Other Stimulate Q Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Oil Safe AR ❑D
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number:
Hilcorp Alaska, LLC
Exploratory ❑ Development ❑
Strati ra hic Service
g p ❑
169-009 '
3. Address: 3800 Centerpoint Drive, Suite 1400
6. API Number:
Anchorage, AK 99503
50-733-20173-00-00 r
7. If perforating:
8. Well Name and Number:
What Regulation or Conservation Order governs well spacing in this pool? N/A
Will planned perforations require a spacing exception? Yes ❑ No
r
Granite Pt St 18761 MUCI-1
9. Property Designation (Lease Number):
10. Field/Pool(s): ,
ADL0018761 = lj- CSw.�
Granite Point Field / Middle Kenai Oil Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
15,715 14,431 11,219 10,066 1,613 psi N/A N/A
Casing Length Size MD TVD Burst Collapse
Conductor 229' 33" 229' 229'
Structural 381' 24" 381' 381'
Structural 437' 18" 437' 437'
Surface 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi
Intermediate 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi
Production 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi
Liner 1,130' 15" 11,222' 10,069' 9,910 psi 10,490 psi
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
10,535 - 11,216
9,402 - 10,064
3-1 /2" & 2-3/8"
9.2# / N-80 & 4.7# N-80
10,078 & 10,224
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
Otis "WB" Penn Packer & N/A
10,158 (MD) 19,035 (TVD) & NA
12. Attachments: Proposal Summary Q Wellbore schematic
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development ❑ Service Q
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations: 7/5/2019
OIL ❑ WINJ Q WDSPL ❑ Suspended ❑
GAS p WAG ❑ GSTOR ❑ SPLUG ❑
16. Verbal Approval: Date:
Commission Representative:
GINJ ❑ Op Shutdown ❑ Abandoned ❑
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Stan W. Golis Contact Name: Dan Marlowe
Authorized Title: Operations Manager Contact Email: dMarlOWe hllcor .COM
Contact Phone: (907) 283-1329
6 &.)&
Authorized Signature: Date: &y0
COMMISSION USE ONLY
I
Conditions of approval: Notify Commission so f hat a representative may witness Sundry Number:
3ou
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑
Other:
RBDMS�k/JUL 0 2 2019
Post Initial Injection MIT Req'd? Yes ❑ No ❑
Spacing Exception Required? Yes ❑ No Subsequent Form Required: / O u
APPROVED BYJ I I
Approved by: COMMISSIONER THE COMMISSION Date:
Form 3 visee /1/ o
/��t
[app 4
Approved application is
/'�
al fl 1 e ate of approval. Attachments in Duplicate
fsN Submit Form and
1 V
'�W-Joi'M$ 441.1
ff
IGl.q Alaska, LLC
Well Name:
Current Status:
Estimated Start Date:
Granite Point St 18761 API Number:
MUCI-1
Well Prognosis
50-733-20173-00
#3
Reg. Hpproval Req'd?
403 Date Reg. Approval Rec'vd:
Regulatory Contact:
First Call Engineer:
Juanita Lovett (8332) Permit to Drill Number: 169-009
Second Call Engineer:
Dan Marlowe (907) 283-1329 (0)
Stan Golis (907) 398-9904 (M)
(907)777-8356(0) (281)450-3071(M)
Current Bottom Hole Pressure:
Maximum Expected BHP:
2,553 psi @ 9,042' TVD 0.272 Ibs/ft (5.22 ppg) based on 2013 SIBHP
2,553 psi @ 9,042' TVD 0.272 lbs/ft (5.22 ppg) based on 2013 SIBHP
Maximum Potential Surface Pressure: 1,613 psi
Using 0.1 psi/ft gradient 20AAC25.280(b)(4)
Brief Well Summary
The MUCI-01 is currently injecting into the Tyonek B & C. This project will stimulate the well in an attempt to
remediate suspected Iron Sulfide buildup.
Procedure,
1. MIRU chemical transfer equipment.
2. Isolate well from injection header and ensure it is bled off.
3. Transfer±550 gallons Oilsafe AR (synthetic acid) into well while it is bled off.
Note — Well goes on vacuum when not on injection. Chemical will be siphoned into the tubing through a
check valve while the well is offline.
4. Flush and rig down chemical transfer equipment.
5. Re -align well to normal injection system and displace with ±94 bbls FIW
6. Shut down pump and soak for±72 hours.
7. Resume normal injection.
Attachments:
I. Well Schematic Current
2. Fluid Flow Diagrams
3. OilsafeAR—Technical Data Sheet
ff SCHEMATIC
Hilcsru Alaska, LLC
RKB to tubing hanger -39, RKB to MLLW =106
PBTD: 11,219' TD: 15,715'
Granite Point Field
Well: Granite Pt St 18761 MUCI-1
Last Completed: 11/27/1984
PTD: 169-009
am• Kn-712_lnl�u nn
CASING DETAIL
Size
Wt
Grade
Conn
ID
Top
Btm
33"
38'
Top (TVD)
Driven
OCTTubing Hanger
Surf
229'
24"
157.5
B
XA Sleeve
22.75
Surf
381'
18"
70.5#
X -Over 3-1/2" x 2-3/8"
Vetco
Thread
10,158'
Surf
437'
13-3/8"
61#
J-55
Butt
12.515
Surf
5,628' (TOW)
--f- Ishoe
40#
N-80
Butt &
LTC
8.835
Surf
4,963'
9-5/8"
43.5#
N-80
LTC
8.755
4,963'
7,259'
10,224'
47#
S-95
8RT &
ST&C
8.681
7,259'
11,257'
5"
18#
N-80
But/FL4S
4.276
10,092'
11,222'
11,186'
23#
N-80
Butt
6.366
Surf
6,693'
7"
26#
N-80
Butt
6.276
6,693'
1 9,186'
29#
N-80
X -Line
6.184
9,186'
11,234'
TUBING DETAIL
JEWELRY DETAIL
No
Depth
(MD)
Depth
(TVD)
ID
OD
Item
to
38'
38'
Top (TVD)
Btm
(TVD)
OCTTubing Hanger
1
±10,047'
±8,991�
10,635'
9,402'
XA Sleeve
100'
10,078'
8,958'
10,660'
10,705'
X -Over 3-1/2" x 2-3/8"
2
10,158'
9,035'
2.55
4.11
Otis "WB" Perm Packerw/Seal Bore aElt
3
10,176'
9,053'
1.94
2.52
--f- Ishoe
4
10,178'
9,055'
1.994
3.875
X -Over 3-1/2" x 2-3/8"
5
10,192
9,068 1
1.875 1
3.09
1 Otis "X" Nipple
6
10,224'
1 9,099' 1
2.00 1
4.00
1 WLREG
Updated BY: JLL 05/24/19
PERFORATION DETAIL
to
Top (MD)
Btm (MD)
Top (TVD)
Btm
(TVD)
FT
Date Status
ne
10,535'
10,635'
9,402'
9,499'
100'
Nov -84
ne
10,660'
10,705'
9,524'
9,567'
45'
Nov -84
ne
10,735'
10,785'
9,596'
9,645'
50•
Nov -84
ne
10,815'
10,825
9,674'
9,684'
10'
Nov -84
ne
10,841'
10,851
9,699'
9,709'
10'
Nov -84
ne
11,050'
11,075'
9,902'
9,927'
25'
Nov -84
ne
11,100'
11,145'
9,951'
9,995'
45'
Nov -84
ie
11,186'
11,216'
10,034'
10,064'
30'
Nov -84
Updated BY: JLL 05/24/19
��
o
�
�
��
Y
�� �
� �g
U
yy
W
1
j/
�' I[li �� I�I%I
W
tt
Y
89
k
d
a
i
ff
p.
4
Y
08 Safe ARS is a safe yet functional replacement for traditional hydrochloric acid treatments and other commonly used OIM&ld acid treatment•.
file non-reguleled by US DOT, Canadian TDO and carries a triple aero huardoua material. Wormation system °cora. 0118sfe ARM
blodegrade. inl0dnysorle.. India approvedby the USBPAaaa Dealonedfor the Environment roduci O r i If rdO B
.. -• .. .yea
FEATURES AND BENEFITS,
• An eseellamaaolaeterface, apertheadlmlmenla,InJeallMwalDmddb-
pvul wdla end s=olo auks
Requlru=orgaNa std add lllov to help retard reavllen ale.
RlanMrd formula Ndudea =deal=t mdtle-mub0lenydem
Relrylre. Ra ban aoninl agent atldlllon for mon apytivallov
EPA D2formuL; Dlatlayndable M to da7a or tau; ap m,vu, for dhacl db-
-huge;mad. Mlh Cleangredlenle Intl DM hIpedesta approvedby the EPA
• B•fa on matmelab, plping and pumphn equlpmenl
• Non W.I.; non fuming mnmulagenly; uo VOC'e
No aamorthry aonlolumenl re0nod a. per 0hepler Ba-IsIF.AA.
I• 611Mnala (ovlanb
An..ubml efielvs torwork-everpn)ecU, bullhead Inalme u,
andeemeninmetllatlon
• Requires ala addlllavivorroaivn lMibltaglop &r mwl appllaauhs.
• tea%bledegndable, wldfraa -I'd m1Yn111 IYNblled
DISSOLVING PROPERTIES
ACID TYPE %CaC0.
Oil safe ARM 60% solution
98,76%
OE Safe ARM 30% Solution
64,00
7 %HCI
49.40%
18% RCI
07.39°/11
7%HCI+100 gp1 of 08%Acelic Acid
78.08%
15% HCI+ 100 gpi of 80% Arctic Acid
87.07%
10% Acetic Anld
01.00%.
18%AcellcAcid
03.09%
8arh laaeneve aaa WM IsdMlh 1 abla b•harmel." Is ..dlneam,ot
aeNemaM Wmaad b rvakf11rl M al IeQT.
P . u em eSafe An formula
ditto= or corrosion inhibitors undermost conditions.
DIRECTIONS FOR USE,
Recommended Dilution Rates: 30.100% with HIO based on the
a"edty of the build-up and the reaction rate required for IDs
'No"'; Vu bale RAI)concentrate conlahls Iron control agents and
de-mulsifievs. No organic acid m corrosion inhibitors ars
required due to the power of ompatented SynlechM.
A Wiest ratio for an acid frac Is one part OB Safe ARM end one
PuH80- BlenNng rafios may very based on specWo sppllcatlon.
andreeommendations from your consultants at Heartland Energy
Group, Ltd.
STORAGE AND HANDLING,
RM
OUSafe Abas storage life ofbetler than one year. Keep
container closed when not in use. As with all chemlcalproducts
andmaterials. lake care ae mwhareyouslore them. Safely
914-3" are augga.tedfor use when handling Ud. product. No
special gloves orprotective equipment are required when
handling lN.product.
wnenpumpmg this product, It 1s strongly recommended to use
mMufactwer approved hose couplings or fillings. DO NOT USE
ALUMW MF7TTINO.S.310Stdnlesa Steel,polypropylene,
Polyethylene are recommended.
PACKAGING:
In bulk tanker trucks from the
loallerpackaging quantities are available
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
REPORT OF SUNDRY WELL OPERATIONS
RECEIVE®
JAN 0 0 2019
1. Operations Abandon LJ Plug Perforations
LJ Fracture Stimulate LJ Pull Tubing LJ Operatiorfs�s
Performed: Suspend ❑ Perforate
❑ Other Stimulate ❑ Alter Casing ❑ Change A.. ❑
Plug for Redrill ❑ Perforate New Pool
96A
❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Variance to 20AAC 25.265M ❑�
2. Operator
4. Well Class Before Work: 5. Permit to Drill Number:
Name: Hilcorp Alaska, LLC
Development ❑ Fxploratory❑ 169-009
3. Address: 3800 Centerpoint Drive, Suite 1400
Stratigraphic ❑ Service 0 6. API Number:
Anchorage, AK 99503
50-733-20173-00-00
7. Property Designation (Lease Number):
8. Well Name and Number:
ADL0018761
Granite Pt St 18761 MUCI-1
9. Logs (List logs and submit electronic and printed data per 20AAC25.071):
10. Field/Pool(s):
N/A
Granite Point Field / Middle Kenai Oil Pool
11. Present Well Condition Summary:
Total Depth measured 15,715
feet Plugs measured N/A feet
true vertical 14,431
feet Junk measured N/A feet
Effective Depth measured 11,219
feet Packer measured 10,158 feet
true vertical 10,066
feet true vertical 9,035 feet
Casing Length Size
MD TVD Burst Collapse
Structural 381' 24"
381' 381'
Surface 437' 18"
437' 437'
Intermediate 5,628' 13-3/8"
5,628' 5,019' 3,090 psi 1,540 psi
Production 11,257' 9-5/8"
11,257' 10,103' 5,750 psi 3,090 psi
Liner 1,130' 5"
11,222' 10,069' 9,910 psi 10,490 psi
Liner 11,234' 7"
11,234' 10,081' 6,340 psi 3,830 psi
Perforation depth Measured depth 10,535 -11,216
feet
True Vertical depth 9,402 - 10,064
feet
3-1/2" 9.2# / N-80 10,187 (MD) 9,063 (TVD)
Tubing (size, grade, measured and true vertical depth)
2-3/8" 4.7# / N-80 10,224 (MD) 9,099 (TVD)
10,158 (MD)
Packers and SSSV (type, measured and true vertical depth)
Otis WB Perm Pkr 9,035 (TVD) SSSV: N/A
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
N/A
Treatment descriptions including volumes used and final pressure:
N/A
13.
Representative Daily Average Production or Injection Data
Oil -Bbl
Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure
Prior to well operation:0
0 0 502 7
Subsequent to operation: 0
0 291 474 3208
14. Attachments (required per 20 AAC 25.070, 25.071, s 25.283)
15. Well Class after work:
Daily Report of Well Operations ❑
Exploratory ❑ Development ❑ Service ❑Q Stratigraphic ❑
Copies of Logs and Surveys Run El
i6. Well Status after work: Oil ❑ Gas WDSPL ❑
Printed and Electronic Fracture Stimulation Data ❑
GSTOR ❑ WINJ ❑✓ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑
17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
318-278
Authorized Name: Stan W. Golis
Contact Name: Joe Kaiser
Authorized Title: Operations Manager
Contact Email: lal5er hiICOfD COm
Authorized Signature:
Date: Q Contact Phone: (907) 777-8393
Form 101404 Revised 4/2017 / /�RBDM I� JAN 0 9 2019 Submit Odginal Only
ff
Hilcy Alaska, LLC
RKB t0 Tubir19Rarger= 39, RKB to MLLW =106'
Granite Point Field
Well: Granite Pt St 18761 MUCI-1
SCHEMATIC Last Completed: 11/27/1984
PTD: 169-009
API: 50-733-20173-00
CASING DETAIL
1 UtMb DETAIL
JEWELRY DETAIL
PERFORATION DETAIL
Zone
Top
Btm
Top
Bt
(MD)
(MD)
(TVD)
(TVD)
FT
Date Status
B Zone
10,535'
10,635'
9,402'
9,499'
100'
Nov -84
B Zone
10,660'
10,705'
9,524'
9,567'
45'
Nov -S4
B Zone
10,735'
10,785'
91596'
9,645'
50'
8 Zone
10,815'
10,825'
9,674'
9,684'
Nov -84
10'
Nov -84
B Zone
10,841'
10,851'
9,699'
9,709'
10'
Nov -84
C Zone
11,050'
11,075'
9,902'
9,927'
25'
Nov -84
C Zone
11,100'
11,145'
9,951'
9,995'
45'
Nov -84
C Zone
11,186'
11,216'
10,034'
10,064'
an,
a..., e.
PBM. 11,219' TD: 15,715'
Updated BY: JUL 06/19/18
D
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanical Integrity Test
Submitto: IM10991IIAleIAQGCCInspeonslssaitiM, op, pboebebr kslb la k-
uw
OPERATOR: Hilmry Naska llc
FIELD/UNIT/PAD: Gueete Point Feld Granite Point Unit/Granite Point Pla6Pml
DATE: 1=7118
OPERATOR REP: Marty Askin
AOGCC REP: c—c,,...
M1' 11 eifil I k
- --- ssures: rra[est Initial tS Mn. 30 Min. 45 Min. BD Min.
PTD 18&009 Tyye lnj W TUGng 2814 2838 2816 2811
Pa xo. Nn Type TBS[ P
THE INJ CNet
W = Weler
G=Gas
S=Slurry
1=btluMUl WsaM '
N=NN lnlecting
TYPE TEST CN- INTERVAL CWm
P=Pre.. Ten 1=Intel Tet
0="her l.fteIn Nobs) 4=Fwryear C,.
V=RaquirtEp Varian.
o=otller (III in nou,
Fpml 10128 (Revised 01201
MIICI x113 -T3%0 MIT
Result CNea
P=Paas
F=Fail
Test psi
- --
2258 BBL
---_ •^
2bbls OA
•w
200
e4uR
2401
2398
Imetal IRetum
370
3]0
370
Result P
Nntee:
Opp Opel OmugMhe whole test The following A10 -MOW
"Yell
Pressures:
Pretest
Initial
15 Min.
30 Mn.
45 Min.
BD Min.
PTD
Type Inj
Tubing
Pacer TVD
BBL Pune
W
Type Test
Test psi
BBL Return
Oq
IrIBrval
Wendt
N2L.A:
Well
Pressures:
Pretest
Initial
15 Min.
30 Min.
45 Min.
BO Min.
PTD
Type Inj
Tubing
Parker TVD
BBL Pump
a
Type Test
Test psi
BBL Return
OA
Interval
Result
Ngo:
Well
Pressures:
Pretest
Insist
15 Min.
30 Min.
45 Min.
60 Min,
PTD
Type lnj
Tubing
PerkerWD
BBL Pump
Iq
Type Test
Test Psi
88L Res
OA
In nh.
Result
N43ta:
Well
Pressures:
Pretest
Initial
15 Min,
30 MN,
qS Min,
80 Min.
PTD
Typelnj
Tubing
Packer ND
BBL Pump
IA
Type Test
Test Psi
BBL ReWrn
OA
erval
Resuk
NMae:
Well
Pressures:
Pretest
Intal
15 Min.
30 Min.
45 Min.
80 Min.
PTD
Type IN
Tubing
Parker TVD
BBL Puny
k4
Type Test
Test psi
BBL Return
OA
Interval
Result
NOtes:
Well
Pressures:
Pretest
Initial
15 Min.
3D Min.
45 Min.
60 Min.
PTD
Type In
Tubing
Parker TVD
BBL Pump
N
Type Test
Test psi
BBL RetumOA
Interval
Result
Nple_s:
Well
Pressures:
Pretest
Initial
15 Min.
30 Mm.
45 Min.
130 Mn.
PTD
Type Inj
Tubing
PackerTVO
BBL Pump
IA
Type Test
Test psi
BBL Rehxn
OA
erva
Reauh
N4Isa:
THE INJ CNet
W = Weler
G=Gas
S=Slurry
1=btluMUl WsaM '
N=NN lnlecting
TYPE TEST CN- INTERVAL CWm
P=Pre.. Ten 1=Intel Tet
0="her l.fteIn Nobs) 4=Fwryear C,.
V=RaquirtEp Varian.
o=otller (III in nou,
Fpml 10128 (Revised 01201
MIICI x113 -T3%0 MIT
Result CNea
P=Paas
F=Fail
From: Joe Kaiser
Sent: Wednesday, January 02, 2019 9:35 AM
To:'Schwartz, Guy L (DOA)' <guy.schwartz@alaska.gov>
Subject: PTD: 169-009 Sundry: 318-278 - Subsequent Report Question
Mr. Schwartz:
This is in regards to Sundry 318-278 and the subsequent report filing
Hilcorp passed a state witnessed post-injection MIT on 12-7-2018. We will continue to operate this well without a SVS
system as requested in the sundry. It is not a normal well work sundry request. Meaning no well work was completed
that produces a change to a well schematic or well operations summary report. Therefore, I am unclear as to what
AOGCC would like attached with the 10-404 report.
I can attached the post-injection MIT report with the 10-404. Is that sufficient?
I am requesting a clarification, so the report may be submitted. I appreciate your time regarding this matter
Joe Kaiser
CIO Operations Engineer
ikoiserit hilcoro com
907-777-8393 Office
907-952-8897 Cell
Well Name GRANITE PT ST 18761 MUCI-1 API Well Number 50-733-20173-00-00 Inspector Name: Guy Cook
is
Insp Num: mitGDC181217172915
MEMORANDUM
State of Alaska
Packer Depth Pretest Initial
Alaska Oil and Gas Conservation Commission
ell
DATE: Wednesday, December 19, 2018
TO: Jim Regg
P.I. SupervisorC' ol oc l I o
R(
SUBJECT: Mechanical Integrity Tests
HILCORP ALASKA LLC
Tubing,
MUCI-1
FROM: Guy Cook
GRANITE PT ST 18761 MUCI-1
Petroleum Inspector
Sre: Inspector
1690090
Reviewed By:
SPT
P.I. Supry
NON -CONFIDENTIAL
Comm
Well Name GRANITE PT ST 18761 MUCI-1 API Well Number 50-733-20173-00-00 Inspector Name: Guy Cook
Permit Number: 169-009-0 Inspection Date: 12/7/2018 ,
Insp Num: mitGDC181217172915
Rel Insp Num:
Packer Depth Pretest Initial
15 Min 30 Min 45 Min 60 Min
ell
MUCI-1
Type Inj
w .1T
9028
Tubing,
2814
2838
zsls -
zsn
[PTD
1690090
Type Test
SPT
ITest psi
2257
IA
400
2404
2401 -
2399 '
BBL Pumped: 1
2
BBL Returned:
2
OA
200
370
370
370
Interval INITAL P/F P
Notes: A small air actuated pump and an open top 55 gallon barrel were used for testing. There was an OOA as well on this well. The pressure was at
zero psi. during the entire testing process. --
"WD JAN 0 3 2019
Wednesday, December 19, 2018 Page 1 of 1
THE sra�r
'ALASKA
GOVERNOR BILL WALKER
Stan Golis %ARKV J a G 3 � U 18
Operations Manager
Hilcorp Alaska, LLC
3800 Centerpoint Drive, Suite 1400
Anchorage, AK 99503
Alaska Oil and Gas
333 West Seventh Avenue
Anchorage, Alaska 99501-3572
Main: 907.279.1433
Fax: 907.276.7542
www.00gcc.alaska.gov
Re: Granite Point Field, Middle Kenai Oil Pool, Granite Pt. St. 18761 MUCI-1
Permit to Drill Number: 169-009
Sundry Number: 318-278
Dear Mr. Golis:
Enclosed is the approved application for the sundry approval relating to the above referenced well.
Please note the conditions of approval set out in the enclosed form.
As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further
time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC
an application for reconsideration. A request for reconsideration is considered timely if it is
received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if
the 23rd day falls on a holiday or weekend.
Sincerely,
Hollis S. French
Chair
S�
DATED this ' day of July, 2018.
RBDMS�D AUG 0 12018
•
Schwartz, Guy L (DOA)
From: Joe Kaiser <jkaiser@hilcorp.com>
Sent: Monday, July 30, 2018 11:40 AM
To: Schwartz, Guy L (DOA)
Cc: Rixse, Melvin G (DOA)
Subject: RE: GPS 18761 MUCI-1 (safety valve waiver)
Attachments: GPP MUCI #1 current wellhead drawing.docx, GPP Water Flood PIDs - Proposed
AOGCC.pdf
Follow Up Flag: Follow up
Flag Status: Flagged
Mr. Schwartz:
The answers to you questions are below. Please feel free to contact me if you have further questions.
1) Historically, waterflood wells were not required to have surface valves. MUCI-1 was last operational in 2005.
Prior to the well requiring a surface safety valve by the new regulations from 2010. Currently, no SVS system is
connected to MUCI-1.
2) Historically, waterflood injection into the reservoir was at high rates and consequently high pressure. We only
intent to pump at a portion of the rate. BHP on 6-3-2013 was 2,468psig. At TVD, the liquid head column will be
3,938 psi for a total pressure on the reservoir of 6,406 psi. We do not anticipate the reservoir pressurizing above
the point at which it will be charged sufficiently to flow to surface. We believe the well will trend toward
vacuum once the pump (pressure source) is shut down.
3) Please see attach wellhead schematic and proposed PID mark-ups showing the check valves. We propose a
double check at the pump discharge in addition to a check valve near the wellhead in the well room. A high
pressure shut down will be installed on the pump in the event of overpressure. This is proposed to be set at
4500 psig.
Joe Kaiser
CIO Operations Engineer
Laiser@hilcorp.com
907-777-8393 Office
907-952-8897 Cell
From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov]
Sent: Friday, July 27, 201811:26 AM
To: Joe Kaiser <jkaiser@hilcorp.com>
Cc: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov>
Subject: [EXTERNAL] GPS 18761 MUCI-1(safety valve waiver)
Joe,
I have some questions regarding the sundry you submitted.
1. What is the reasoning for the waiver ? is current SVS system disabled or non functioning?
2. 1 agree that the well will not back flow in current state of low BHP. But wouldn't that change after a few years of
injection?
3. Please forward a current wellhead diagram and proposed showing check install.
Guy Schwartz
Sr. Petroleum Engineer
AOGCC
907-301-4533 cell
907-793-1226 office
CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation
Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged
information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended
recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to
you, contact Guy Schwartz at (907-793-1226) or (Guv.schwartz@alaska.gov).
--- -- -- --� - 3' -- -- ----- -- FW-5032-4'-H9 -- -- -- -- - _- -- 3' -- -- -- I
I
o 1 2'
4x3 2' 3'
4
PI PI PI
I 4x11/2 m I 0/10,000 0/10.000 0/10,000 1
N I
PI i ° 1 WELL WEL_ WELL
0/10000 I ( HEAD HEAD HE
74- X 1'SET a
AD
I I 4500 P® 3/y X 1'
PSV 4 SETPSV 4 3' I
II 24-13A 4500 PSI M AC2
2 2 3/142 2 g3 4 X/ I
1 I CSO 2 1/z PI 1/2 2 CS ]/1000 CSO MAC1 4500 PSI I
I
0/5000 0/15002 1/-22 2 S a
C 0 1200 PSI B ET
� X 1 1
P 2'X2' PI
1 I M CY SET ® )/100 M
CSO 8 1200 PSI I
C/600 3' ' PI PI 2
0/800 0/600
* 1
I I 2 PSV 2 2 2 2 I
I 1 24-1318
I 4 X 3 I cso );' x i MUC-II MUC-1
GP-53 120o®PSIG 1
2 24-13 I
ITER FLOOD WELL — I — — (NIS) WATER FLOOD WELLS
LEG—ROOM 4 _ _ _ J _ _ _ LEG ROO_M_3
----— -- -- -- -- — —— —— —— —— — —— —-
1
3, FW-5030-3'-H9
0 3. I 1 1
i
I _ Y o
T I
PI
pl PII 22-13
i 0/6,000 0/6,000 '
WELL WELL
HEAD HEAD t I I 4
I I �❑� I
' 4 4 I ( SET ® 3500 -
I
' g PSIG INCR.
yxt PAHH
1 I SET ® PSV 22-F13 L
2 2 1-1/z• X 2' 2 2 1-1/z' X 2' I 1 3600 PSIG 2-13A
I
PSV PSV GP-RV-125) 2 2
' CSO 2 X 1-t/z 12-24A 4 00 PSI CSO 2x11/2 33-14A 4500 PSI T 0SET 0I 0 ( PI 1
3/4 X 1. 2 CS 0/5000
t/z 2 u t/2 2 J SET ® P V V
PI PI 1200 PSIG 22-136
o/t000 0/1000 , (GP-096) --
I CSO �- CSO 2x1 /2 1 i I
I 1'I2x3/� 1 CSO i
2 PSV 2' X 2' 2
1/2 12-248 1200 PSI '/2 2' X 2'
PSV
12-24 a 33-14 33`148 jEoo psl I I 22-13 I
(NIS) ABANDONED WATER FLOOD WELLS - (NIS)
�———---_——--LEG ROOM 1
DRAWINGS NOTES: REV DATE REVISED � `�° ° o��„„ o�� ,;` �""�� GRANITE POINT PLATFORM
1. *DENOTES: DISCHARGE/VENTS TO ATMOS. Dn 05/c5/94REVISED CUENT'S COMMENTS DS o nr Ks/eM ALASKA
UpCOOK INLET
YEW7-0
.. e
2Y"
AEs1�v Tetcs : rn Ps�d,�'Zaa°F
j(N1bH7 ►i�vsws, Sx3�
4��lKrr�' X 3v r1" ►�
?-07$11)
NF C*af P#Ap
'ta 'P+►M1 N41ov
PA
F- 0SM
tea= I M' -f OL) (AA04'
2� t,� MCd.Sc� Prig
,�N
M � M—crlal
t = K?l I
wl r oAwc run , wF iu t� 1,1u RAF
M Ct (V- A46rca
Ay tip, 14fw K(M IN) Of, t91XIYAA
311,01 `+Uov -,lodl v
�.. .._._. FQ.M tXT1ON
Nt�+►+ 's��. 54Awrl rtt�
Ku SPsr�, ice)
SE7 6'
BDI,I,G .' ps � qsaa
s�!
Wolf
e�
,
01 Fw-Sarni 4, *1
41(07.
1W,
ILY K Cd[ RE 19U0 HiG C1 PFt+C YCOI ULC rSR MAt DArt c�mvan�r �swa�tt reuwer va�nu,[oar
U, I j � -'� �� �'q �� � `"y „�"�" f.•�„
n >x� R Y r., soca a rar.4lCm u��ww+tr.
r., ., Are,r r. r-:e^r�h fo +rcK n
iERIES 7216 TRANSLTTE TANK TRUCK _ _� __—�� _ _. _ wYc UNOCAL��
ENGINEERING APPROVAL ,
i
�7
,�N
M � M—crlal
t = K?l I
wl r oAwc run , wF iu t� 1,1u RAF
M Ct (V- A46rca
Ay tip, 14fw K(M IN) Of, t91XIYAA
311,01 `+Uov -,lodl v
�.. .._._. FQ.M tXT1ON
Nt�+►+ 's��. 54Awrl rtt�
Ku SPsr�, ice)
SE7 6'
BDI,I,G .' ps � qsaa
s�!
Wolf
e�
,
01 Fw-Sarni 4, *1
41(07.
1W,
ILY K Cd[ RE 19U0 HiG C1 PFt+C YCOI ULC rSR MAt DArt c�mvan�r �swa�tt reuwer va�nu,[oar
U, I j � -'� �� �'q �� � `"y „�"�" f.•�„
n >x� R Y r., soca a rar.4lCm u��ww+tr.
r., ., Are,r r. r-:e^r�h fo +rcK n
iERIES 7216 TRANSLTTE TANK TRUCK _ _� __—�� _ _. _ wYc UNOCAL��
ENGINEERING APPROVAL ,
• 0 IT, ECiLEIVED
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
APPLICATION FOR SUNDRY APPROVALS
20 AAC 25.280
sUN � �?
sBOGCt
1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repa'r Well ❑ Operations shutdown
Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑
Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other. Variance to 20AAC25.265(b)�
2. Operator Name:
4. Current Well Class:
5. Permit to Drill Number.
Hilcorp Alaska, LLC
Exploratory ❑ Development ❑
Stratigraphic ❑ Service
169-009 -
3. Address: 3800 Centerpoint Drive, Suite 1400
6. API Number.
Anchorage, AK 99503
50-733-20173-00-00 '
7. If perforating:
8. Well Name and Number.
What Regulation or Conservation Order governs well spacing in this pool? N/A
Will planned perforations require a spacing exception? Yes ❑ No 2
Granite Pt St 18761 MUG -1
9. Property Designation (Lease Number):
10. Field/Pool(s):
ADL0018761
Granite Point Field / Middle Kenai Oil Pool
11. PRESENT WELL CONDITION SUMMARY
Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD):
15,715 14,431 - 11,219 10,066 1,559 psi WA N/A
Casing Length Size MD TVD Burst Collapse
Structural 381' 24" 381' 381'
Surface 437' 18" 437' 437'
Intermediate 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi
Production 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi
Liner 1,130' 5" 11,222' 10,069' 9,910 psi 10,490 psi
Liner 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi
Perforation Depth MD (ft):
Perforation Depth TVD (ft):
Tubing Size:
Tubing Grade:
Tubing MD (ft):
10,535 - 11,216
9,402 - 10,064
3-1/2" & 2-3/8"
9.2# / N-80 & 4.7# N-80
10,178 & 10,224
Packers and SSSV Type:
Packers and SSSV MD (ft) and TVD (ft):
Otis "WB" Perm Packer & N/A
10,158 (MD) / 9,035 (TVD) & NA
12. Attachments: , Proposal Summary Wellbore schematic
13. Well Class after proposed work:
Detailed Operations Program ❑ BOP Sketch ❑
Exploratory ❑ Stratigraphic ❑ Development ❑ Service [21
14. Estimated Date for
15. Well Status after proposed work:
Commencing Operations: 7/16/2018
OIL ❑ WINJ WDSPL ❑ Suspended ❑
GAS ❑ WAG ❑ GSTOR ❑ SPLUG 11Commission
16. Verbal Approval: Date:
Representative:
GINJ F-1OpShutdown E]Abandoned E]
17. 1 hereby certify that the foregoing is true and the procedure approved herein will not
be deviated from without prior written approval.
Authorized Name: Stan W. Golis Contact Name: Joe Kaiser
Authorized Title: Operations Manager Contact Email: ikaisef hIICo &=
p0 Contact Phone: 907 777-8393
'� � �P �
Authorized Signature: • 6� Date: ZS ^ lg
COMMISSION USE ONLY
Conditions of approval: Notify Commission so that a representative may witness Sundry Number.
1 5 1 S - 7
F5 �J°
Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test (� Location Clearance ❑
Other: if "S*V'� w r�.t�-} �✓� �h/� 'Z -r, '4=` `G Z..') • Z.-4-, -!�_ 60) L)
Post Initial Injection MIT Req'd? Yes O/No ❑
Spacing Exception Required? Yes ❑ No Subsequent Form Required: r L l
APPROVED BY 1
-"'"'
Approved by: _. COMMISSIONER THE COMMISSION Date:
ORIGINAL R ,�- 7L,/s
G O i 1 mit Form and
For mi 0-403 Revised 4/2017 /Approved application is valid for 12 months from the date of approval. Attachments in Duplicate
Hilcorp Alaska, LLI
SVS — SSV Exemption
Well: MUCI -1
Date: 6/27/2018
Well Name:
MUCI - 1
API Number:
50-733-20173-00
Current Status:
SI Waterflood Injector
Leg:
N/A
Estimated Start Date:
July 16th, 2018
Rig:
N/A
Reg. Approval Req'd?
403
Date Reg. Approval Rec'vd:
Regulatory Contact:
Juanita Lovett 777-8332
Permit to Drill Number:
169-009
First Call Engineer:
Joe Kaiser
(907) 777-8393 (0)
(907) 952-8897 (M)
Second Call Engineer:
Michael Quick
(907) 777-8442 (0)
(907) 317-2969 (M)
AFE Number:
1821433
Current Bottom Hole Pressure: 2,468 psi @ 9,089' TVD (SIPT Survey Data 6-3-2013)
Current Surface Pressure: 0 psi (Actual Reading)
Max. Potential Surface Pressure: 1,559 psi (Based on 0.1 psi/ft gradient)
Brief Well Summary
MUCI - 1 was initially drilled and completed in the Middle Kenai Oil Pool in 1969. In 1970, a casing leak was
detected at —5,700' and repaired. In 1972, a 7" liner was installed and an HCI Acid flush was completed. In
1984, a 5" liner was run, the well was re -perforated in the B and C zones and a new 3-1/2" completion was
installed. The well was used for water flood operations until 2005.
Notes Regarding Wellbore Condition
1) Shut-in pressure data from June 2013 shows liquid level at 3,933' MD with 0 psi surface pressure.
2) No injection has occurred since January 2005.
3) Water column equivalent (0.433 psi/ft) is 3,935 psi.
4) Pre-injection MIT was performed to 2,500 psi 11-24-17.
Request:
Hilcorp is requesting a variance of 20 AAC 25.265 (b) to eliminate the installation of an automated surface
safety valve due to this injection well being incapable of sustained back flow.
During waterflood pumping operations, MUCI-1 will have a full fluid column of water equivalent to —3,935 psi.
The current bottom hole shut-in pressure is 2,468 psi. This is a pressure differential deficit of 1,465 psi,
indicating the well will be on a vacuum until liquid level stabilizes. Based on the pressure/temperature survey
from 6-3-2013, the liquid level is at —3,933' MD.
Hilcorp will install a check valve adjacent to the well tree to prevent any backflow to surface as good
engineering practice.
Attachments:
1. Actual Schematic
2. Pressure/Temp Survey 6-13-2013
_�' L -o" f
/i1L l i
_/_ 3v
.]U 0Granite• Point Field
Well: Granite Pt St 18761 MUCI-1
SCHEMATIC Last Completed: 11/27/1984
PTD: 169-009
Hilcorp Alaska, LLC API: 50-733-20173-00
RKB to Tubing Hanger = 38, RKB to MLLW = 106
PBTD:11,219' TD: 15,715'
CASING DETAIL
Size
Wt
Grade
Conn
ID
Top
Btm
24"
157.5
B
10,635'
22.75
Surf
381'
18"
70.5#
B Zone
Vetco
Thread
2
Surf
437'
13-3/8"
61#
J-55
Butt
12.515
Surf
5,628' (TOW)
2.52
40#
N-80
Butt&
8.835
Surf
4,963'
9-5/8-
43.5#
N-80
LT&C
8.755
4,963'
7,259'
6
47#
S-95
8RTST&C
8.681
7,259'
11,257'
5"
18#
N-80
Butt/FL4S
4.276
10,092'
11,222'
C Zone
23#
N-80
Butt
6.366
Surf
6,693'
7"
26#
N-80
Butt
6.276
6,693'
9,186'
Nov -84
29#
N-80
X -Line
6.184
9,186'
11,234'
TUBING DETAIL
3-1/2" 9.2# N-80 Butt 2.992 Surf 10,178'
2-3/8" 4.7# N-80 Butt 1.995 10,178' 10,224'
JEWELRY DETAIL
No
Depth
(MD)
Depth
(TVD)
ID
OD
Item
Date
38'
38'
10,535'
10,635'
OCT Tubing Hanger
1
±10,112'
±8,991'
B Zone
XA Sleeve
2
10,158'
9,035'
2.55
4.11
Otis "WB" Perm Packer w/Seal Bore Ext
3
10,176'
9,053'
1.94
2.52
Btm of Mule shoe
4
10,178'
9,055'
1.994
3.875
X -Over 3-1/2" x 2-3/8"
5
10,192'
9,068'
1.875
3.09
Otis "X" Nipple
6
10,224'
9,099'
2.00
4.00
WLREG
C Zone
11,050'
11,075'
9,902'
9,927'
25'
Nov -84
C Zone
11,100'
11,145'
9,951'
PERFORATION DETAIL
Zone
Top
(MD)
Btm
(MD)
Top
(TVD)
Btm
(TVD)
FT
Date
Status
B Zone
10,535'
10,635'
9,402'
9,499'
100'
Nov -84
B Zone
10,660'
10,705'
9,524'
9,567'
45'
Nov -84
B Zone
10,735'
10,785'
9,596'
9,645'
50'
Nov -84
B Zone
10,815'
10,825'
9,674'
9,684'
10'
Nov -84
B Zone
10,841'
10,851'
9,699'
9,709'
10'
Nov -84
C Zone
11,050'
11,075'
9,902'
9,927'
25'
Nov -84
C Zone
11,100'
11,145'
9,951'
9,995'
45'
Nov -84
C Zone
11,186'
11,216'
10,034'
10,064'
30'
Nov -84
Updated By: 1LL06/19/18
Granite Point Platform
MUCI #1
18X133/8X95/8X7X3%
Valve, Swab, OCT -30,
3 1/16 10M FE, HWO,
BB trim
Valve, Master, OCT -30,
3 1/16 10M FE, HWO,
BB trim
Tubing head, FMC -U-00, 13
5/8 5M API hub bottom X 7
1/16 5M top, w/ 2- 2 1/16
5M SSO
Unihead, OCT type 2, 13 5/8 5M API
hub top X 13 3/8 BTC casing bottom, �-
w/ 2- 2" LPO on lower section, 2-
2 1/16 5M SSO on upper section, IP
internal lockpin assy
Starting head, OCT, 211/4
2M Hubx24XIM Hub
w/ 2- 2" LPO, prepped
f/18" EN hanger
Conductor housing, OCT,
24 X 1M Hub
24" Buttweld
BHTA, OCT -13 -11 -AO,
3 1/16 10M FE
L1 18"
13 3/8"
9 5/8"
7"
3 %"
Granite Point
MUCI #1
07/28/2018
Tubing hanger, FMC -U30 -1A -
ENS, 7 1/16 X 3 1/2 IBT lift
and susp, w/ 3" Type IS BPV
profile, 5.990" neck
Valve, Wing, OCT -20,
3 1/16 10M FE, HWO,
BB trim
Adapter, FMC -A-4,
7 1/16 5M Stdd X
3 1/16 10M, w/ 5.990"
pocket
11
•
Hilcorp Alaska, LLC — MUCI 1 Pressure Temp Survey 6-3-13
0
0 V
1000
2000
3000
4000
m
Y
5000
d
r-
6000
rL
d
lei
7000
8000
9000
10000
11000 F_
50
Pressure (psia)
250 500 750 1000 1250 1500 1750 2000 2250 2500
60 70 80 90 100 110 120 130 140 150 160 170
Temperature (Deg. F)
Pressure — Perfs PKR —Temperature
•
Chevron
Steve Lambert
Sr. Advising Petroleum
Engineer
Unocal Alaska
Union Oil Company of California
Box 196247
Anchorage, Alaska 99519-6247
Tel 907-263-7658
Fax 907-263-7847
salambert@chevron.com
November 29, 2007
Thomas Maunder
Alaska Oil and Gas Commission
333 W. 7th Ave., Suite #100
Anchorage. Alaska 99501-3509
Dear Tom:
~~~'f DES; ~, ~ 2007
Attached is form 10-404 covering the injection test wf~ic~h ,vy~,S.,perforlrfe~f`'on well MUCI-1 on
November 18, 2007. The attached data from the test confirms that there is sufficient injectivity ~
remaining in well MUCI-1 to justify resuming full time injection into the well. The test also
confirmed that pressure integrity exists between the tubing and casing.
It is planned to return this well to continuous injection as soon as the facility modifications can
be made to restore the capability for water injection on a full-time basis.' Initially it is planned to
limit injection to 150-200 BWPD plus make-up fluid from the waste water treatment plant. In the
future, additional water volumes may be injected. The decision to increase injection will be
based on the injectivity response and the response in offset producers.
This well successfully passed the MIT in March 2005. A follow-up MIT is planned for March
2009 on the regular test schedule.
Sincerely,
i F4/
lam.-. _ ~~V~;. i ,may
Steve Lambert
~~
cc: MIT book
Pat Moore (Exxon-Mobil) NOV ~ Q zQq~
Sharon Sullivan Alaska Oil & Gas Dons, Commission
Well File
Anchorage
.~ ~U~-~
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSI~
REPORT OF SUNDRY WELL OPERATIONS
~~~
~I~s6~a tai & Gay Cl~f~s. ~4mmissiun
1.Operations Abandon ^ RepairWell^ Plug Perforations ^ Stimulate^ Other 0 Injep~gph'D~QB
Performed: Alter Casing ^ Pull Tubin~ Perforate New Pool ^ Waiver ^ Time Extension ^
Change Approved Program ^ Operat. Shutdowr^ Perforate ^ Re-enter Suspended Well ^
2.Operator 4. Well Class Before Work: 5. Permit to Drill Number:
Name: Union Oil Company of California
Development ^ Exploratory ^ C
fi9~ ~ ~ 1®0~1
3. Address: Stratigraphic^ Service ^~ 6. API Number: ~ y~l?.~K „~
Box 196247, Anchorage, AK 99519 50-733-2
7. KB Elevation (ft): 9. Well Name and Number:
~9'4~' ~1a(y,•(h~'~ MUCI-1
8. Property Designation: 10. Field/Pool(s):
ADL 18761 Granite Point Field Middle Kenai Sands
11. Present Well Condition Summary:
'9
~
"
'
~ ~L•(
•
7IS
r5
Total Depth measured ~,etf6" feet Plugs (measured)
true vertical i~ f•~j ~e ~ y (~, v~ Junk (measured)
~
Effective Depth measured 9,527 -
feet
true vertical 8,445 feet
Casing Length Size MD TVD Burst Collapse
Structural
Conductor
Surface 437' 18" 437' 437'
Intermediate 5,973' 13 3/8" J-55, 61# 5,973' 5,339' 3090 psi 1,540 psi
Production 11,257' 9 5/8" N-80, S-95, 6,290' 10,151' 5750 psi 3090 psi
40#, 43.5#, 47#
Liner 5"-1,130' 7" S-95 N-80, 32# 5"-11,222' S"-10.116' 9,060 psi 8,600 psi
7"- 11,234' S" N-80 18# 7"-11,234' 7"-11,234' 10,140 psi 10,490 psi
Perforation depth: Measured depth: 10,535-10,635, 10,660-10,705, 10,735-
10,785, 10,815-10,825', 10,841-10,851',
11,050-11,075' 11,100-11,145', 11,186-
11,216'
True Vertical depth: 9,401-9,498', 9,523-9,566', 9,596'-9,644', ~
9,674'-9,683', 9,699'-9,708', 9,901'-9,926',
9,950'-9,994', 10,033'-10,063'
Tubing: (size, grade, and measured depth) 3.5" Buttress N-80 9.2# 10,224'
Packers and SSSV (type and measured depth) Otis WB Perm Packer 10,150'
12. Stimulation or cement squeeze summary:
Intervals treated (measured):
Treatment descriptions including volumes used and final pressure: , -,~ ~~f ,~~ ~~ -~ ~ ~00~
13. Representative Daily Average Production or Injection Data
Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure
Prior to well operation: 0 BWPD 0 0
Subsequent to operation: 563 BWPD ~ 1,700 psi 2,500 psi
14. Attachments: 15. Well Class after work:
Copies of Logs and Surveys Run Exploratory ^ Development ^ Service Q ~
Daily Report of Well Operations X 16. Well Status after work:
Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^~ ' WDSPL ^
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt:
307-273
Contact Steve Lambert
Printed Name ~ - ~q ~ ~ Title Advising Petroleum Engineer
n
~
~
Signature~~~ ~~'~
~ -'
Phone 263-7658 Date 11/28/2007
!Z'tl~d'7
U K t v~ 1 v rl L ~` '~ ~~~~ 12f~~7~~ az •tt-r~
Page 1 of 1
•
Maundec, Thomas E (DOA)
From: Maunder, Thomas E (DOA)
Sent: Friday, December 14, 2007 8:23 AM
To: 'Lambert, Steve A`
Cc: Greenstein, Larry P
Subject: RE: MUCI-1 (169-009}
Thanks much Steve. I didn't dig all the way through the procedures. I almost asked if the 2000 psi was imposed.
My questions are answered.
Tom Maunder, PE
AOGCC
From: Lambert, Steve A [mailto:salambert@chevron.com]
Sent: Thursday, December f3, 2007 4:50 PM
To: Maunder, Thomas E (DOA)
Cc: Greenstein, Larry P
Subject: RE: MUCI-f (i69-009}
Tom you are correct, we believe the drop in annulus pressure is a result of temperature effects. As you can see
from the attached procedure, we did have the 2,000 psi pressure placed on the annulus. This well had historically
injected at very high tubing pressures and we wanted to make sure we had sufficient pressure on the backside of
the tubing before starting the test. We were pleasantly suprised that high pressures were not required to obtain
injection. The pressure was bled off the casing following the test, and the annulus and tubing appear to be
isolated.
I have attached the pressure data for this well for the last 2 years which clearly shows pressure integrity between
the 2 strings.
From: Maunder, Thomas E (DOA} [mailto:tom.maunder@alaska.gov]
Sent: Thursday, December 13, 2007 3:35 PM
To: Lambert, Steve A
Cc: Jim Regg; Greenstein, Larry P
Subject: MUCI-i (159-009)
Steve,
I am reviewing the 404 submitted for the infectivity test conducted an November 18, 2007.
On the injection pressure graph, the 7" x tubing annulus pressure starts at 2000 psi and declines.
I presume the decline is due to coaling, however I am curious as to why the annulus starts at 2000 psi?
Looking at the file, the Inspector notes that there was 2400 psi on the IA when the MIT was conducted March 18,
2005. From this part of the record, it would appear that there is some communication to the inner annulus. Could
you provide additional information on this?
Thanks in advance.
Tam Maunder, PE
AOGCC
12/14/2007
C
•
MUC I-1 Pressure Observations
2500 -,.~.,~~.~„~:, ,____-~_._.._ _ .~,~,.~~. ,,may ~_..,_ .. _> 1
Hours 1
Tubing '
7"
2000 , ~9 5/8" - - - - - -
1
--- - - - - - - - -
~~ ~ 13 3/8"
X20"
Rate ~ 1
1500 1
` 1
a
1000 0
0
500 0
0
0 -- 0
12/14/05 03/24/06 07/02/06 10/10/06 01/18/07 04/28/07 08/06/07 11/14/07 02/22/08
Time
Printed on 12/14/2007 at 8:23 AM
MUC I-1 Pressure Data 2007 12 12.x1s
MUCI-1 Infectivity Test
3,600
3,200
2,800
d 2,400
N 2,000
N
a
~ 1,600
O
v
•= 1,200
800
400
0
n ,~ ~-- ----_ .
---~-Injection Pressure
--~ Injection Rate
18
16
14
12 ~
a
c~
v
10 ~
ea
8 0
v
m
6 ~
4
2
0
0 20 40 60 80 100 120 140 160
Cumulative Injection (BBLS)
•
•
3,000
2,500
2,000
.-
a
m
~ 1,500
N
N
d
a
1,000
MUCI-1 Infectivity Test-
Injection Pressures
~--Tubing Pressure
-f-Casing Pressure
500
0 ~-~~ '
0 20 40 60 80 100 120 140 160
Cumulative Injection (BBLS)
•
•
• ~ ~ ~n+rw M v a K0 w®
MUCI #1
Injection test 11/18/2007
TIME Rate GPM Rate BPD Volume Total vol Tubing psi 7 in psi 9 5/8 in psi 13 3/8 in psi
7:12 6.38 219 .56 BBLS 0.56 0 2000 450 25 start 'ob
7:23 8.24 283 2.05 BBLS 2.61 0 2000 450 25 well on vac.
7:41 9.08 311 3.64 BBLS 6.26 0 2000 450 25 well on vac.
8:01 12.32 422 5.62 BBLS 11.87 0 2000 450 25 well on vac.
8:14 12.5 429 3.94 BBLS 15.81 750 2000 450 25 well on vac.
8:23 6.44 221 2.30 BBLS 18.12 500 2000 450 25 slow to min rate
8:43 6.44 221 3.12 BBLS 21.24 300 2000 450 25 rate and pressure
8:44 8.45 290 0 BBLS 21.24 400 2000 435 25 increase rate 2 pm
9:04 8.42 289 4.43 BBLS 25.67 600 1950 410 25 rate and pressure
9:15 10.44 358 1.18 BBLS 26.85 600 1950 410 25 increase rate 2 m
9:30 10.45 358 4.6 BBLS 31.45 950 1950 410 25 rate and ressure
9:45 12.44 427 3.54 BBLS 34.99 1050 1950 410 25 increase rate 2 m
10:00 12.44 427 4.79 BBLS 39.78 1350 1950 400 25 rate and ressure
10:15 14.44 495 4.8 BBLS 44.58 1400 1900 385 25 increase rate 2 m
10:30 14.42 494 4.63 BBLS 49.21 1700 1850 370 25 rate and ressure
10:45 16.42 563 5.43 BBLS 54.64 1800 1850 350 25 increase rate 2 pm
11:00 16.42 563 6.16 BBLS 60.8 2050 1860 320 25 rate and pressure
11:15 16.42 563 5.4 BBLS 66.2 2175 1800 300 25 start 3 hour test
11:30 16.41 563 5.78 BBLS 71.98 2200 1850 300 25 rate and pressure
11:45 16.41 563 5.84 BBLS 77.82 2300 1850 280 25 rate and ressure
12:15 16.41 563 13.37 BBLS 91.19 2300 1850 260 25 rate and ressure
12:45 16.41 563 9.91 BBLS 101.11 2400 1800 240 25 rate and ressure
13:15 16.41 563 11.72 BBLS 112.82 2425 1800 220 25 rate and pressure
13:45 16.41 563 11.82 BBLS 124.64 2500 1750 200 25 rate and ressure
14:15 16.41 563 11.8 BBLS 136.44 2500 1700 190 25 rate and ressure
14:16 0 0 1400 ISIP
14:30 0 0 1100 15 min shut in
14:45 0 0 500 30 min shut in
15:15 0 0 0 1 hour shut in
.
~V/ÆVŒ rnJ~ ~~~~æ~
.
AIßASIiA. OIL AND GAS
CONSERVATION COMMISSION
SARAH PALIN, GOVERNOR
333 W. 7th AVENUE, SUITE 100
ANCHORAGE, ALASKA 99501-3539
PHONE (907) 279-1433
FAX (907) 276-7542
Steve Lambert
Sr. Advising Petroleum Engineer
UNOCAL
PO Box 196247
Anchorage, AK 99519
SCANNED AUG 2 3 2007
Re:
Granite Point Field, Middle Kenai Oil Pool, MUCI-1
Sundry Number: 307-273
~., q
'-~
Dear Mr. Lambert:
Enclosed is the approved Application for Sundry Approval relating to the
above referenced well. Please note the conditions of approval set out in the
enclosed form.
When providing notice for a representative of the Commission to witness any
required test, contact the Commission's petroleum field inspector at (907)
659-3607 (pager).
As provided in AS 31.05.080, within 20 days after written notice of this
decision, or such further time as the Commission grants for good cause
shown, a person affected by it may file with the Commission an application
for rehearing. A request for rehearing is considered timely if it is received by
4:30 PM on the 23rd day following the date of this letter, or the next working
day if the 23rd day falls on a holiday or weekend. A person may not appeal
a Commission decision to Superior Court unless rehearing has been
requested.
DATED this ~y of August, 2007
Enc!.
Abandon
Alter casing D
D
Change approved program
2. Operator Name:
Union Oil Company of California
3. Address:
fJ7::S
~
1, Type of Request:
¢¿) Cfì ~..}..1/0' ~ Ki:.\."t::1 v I.-U
~ STATE OF ALASKA . ~/Ã AUG 1 7 2007
ALASKA OILAND GAS CONSERVATION COMMI ON i9.;b:>
APPLICATION FOR SUNDRY APPROVALS Alaska Oil & Gas Cons. Commission
20 MC 25.280
Operational shutdown
Plug Perforations D
Perforate New Pool D
4. Current Well Class:
Waiver
Other J
Long Term
Injectivity Test
Development
Stratigraphic
D
D
Exploratory D
o
Service
Box 196247, Anchorage, AK 99519
7. KB Elevation (ft):
106'
Perforation Depth MD (ft):
10,535-10,635, 10,660-
10,705, 10,735-10,785,
10,815-10,825',10,841-
10,851',11,050-11,075'
11,100-11 ,145', 11,186-
11,216'
Packers and SSSV Type:
Otis WB Perm Packer
12. Attachments: Description Summary of Proposal
Detailed Operations Program D BOP Sketch D
14. Estimated Date for
8. Property Designation:
ADL 18761
11.
Total Depth MD (ft):
9,600
Casing
Structural
Conductor
Surface
Intermediate
Production
Li ner
Commencing Operations:
16. Verbal Approval:
9. Well Name and Number:
MUCI-1
10. Field/Pools(s):
Granite Point Field Middle Kenai Sands
'ð-Q \ \,,\"~ - ~Û
Total Depth TVD (ft):
8,511'
Length
PRESENT WELL CONDITION SUMMARY
Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured):
9,527 8,445'
Junk (measured):
Size
Burst
Collapse
TVD
437' 18" 437'
5,973' 133/8" J-55, 61# 5,973'
11,257' 9 5/8" N-80& S-95, 6,290
40#,43.5#,47#
5"- 1,130' 7" S-95 N-80, 32# 5" 5"- 11,222' 7"-
7"- 11,234' N-80 18# 11,234'
Perforation Depth TVD (ft): Tubing Size:
9,401-9,498',9,523-9,566', 3.5" Buttress
9,596'-9,644',9,674'-9,683',
9,699'-9,708',9,901'-9,926',
9,950'-9,994', 10,033'-10,063'
437'
5,339'
10,151'
3,090
5,750
1,540
3,090
5'-10,116'
7"-10,128
Tubing Grade:
N-80 9.2#
9,060 8,600
10,140 10,490
Tubing MD (ft):
10,224'
Packers and SSSV MD (ft):
10,151' MD
8/27/2007
Date:
J 13. Well Class after proposed work:
Exploratory D Development D Service 0
15. Well Status after proposed work:
Oil D Gas D Plugged D Abandoned D
WAG D GINJ D WINJ 0 WDSPL D
Commission Representative:
17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact
Printed Name Stev Lambert Title Sr. Advising Petroleum Engineer
Signature Phone 2 _ .., c... S6 Date
COMMISSION USE ONLY
8/16/2007
Conditions of approval: Notify Commission so that a representative may witness
Sundry Number:
Plug Integrity D
Other:
Subsequent Form Required:
Approved by:
BOP Test D
Location Clearance D
Mechanical Integrity Test D
APPROVED BY
THE COMMISSION
Date:
~ ~~;6u;cate
Form 10-403 Revised 07/2005
.
.
RECE\VED
Chevron
~
IIìijíI
Steve Lambert
Sr. Advising Petroleum
Engineer
Unocal Alaska AUG 1 7 2007
Union Oil Company of California C . '011
Box 196~71i1t!o On &. I~a s COOS. omm'ss,
Anchora~,a....rmRå 9'9'5 9-6247
Tel 907-263-7658 nchøragp
Fax 907-263-7847
salambert@chevron.com
August 16, 2007
Thomas Maunder
Alaska Oil and Gas Commission
333 W. 7th Ave., Suite #100
Anchorage. Alaska 99501-3509
Dear Tom:
Unocal is proposing to evaluate the restart of waterflood on the Granite Point platform. As the
first step in the process, Unocal requests permission to perform an injectivity test on well MUCI-
1 (Permit No.1690090) using filtered seawater. The purpose of the injectivity test is to
determine if water can be pumped into the formation at reasonable pressures and rates. MUCI-
1 successfully passed an MIT on March 17, 2005. A copy of the MIT and form 10-403 are
included with this submission. Upon completion of the test, form 10-404 will be submitted
summarizing the test.
Initial plans for the waterflood would involve injection of produced water supplemented with
treated sewage water into 1 or 2 wells. Initial injected volumes are expected to be 200 barrels
of produced water per day supplemented with 200 barrels of treated sewage per day. Return of
the full field waterflood will not likely occur until the rig is activated on the platform in 2010,
Sincerely,
~r\~
Steve Lambert
cc: MIT book
Mark Pohler (Exxon-Mobil)
Well File
"
. "
.
.
..
STATE OF ALASKA
ALASKA OIL AND GAS CONSERVATION COMMISSION
Mechanlcalln~rlty Test.
Email to:Tom_Maunder@admin.statø.ak.U$;Bob]Jeckenstein@admin.s1ate.ak.us;Jim_Regg@admin..statè.ak.us
Larry Greens1øin (greensteinlp@unocal.com); Tim Rodriquez (trodriguez@unocal.com)
OPERATOR:
FIELD I UNIT I PAD:
DATE:
OPERATOR REP:
AOGCC REP:
Unocal Alaska
Granite Point Field I Granite Point Platform
3-11-éJ~·
Well
P.T.D.
Notes:
Test-Details:
n_ e-
;)
'.
O{.
.'
TYPE INJ Codes
F .. Fresh Water Inj
G .. Gas Inj
S .. Salt Water Inj
N .. Not InjectiÌlg
TYPE TEST Codes
_ M .. Annulus Monitoring
P .. Standard Pressure TèSt
R .. Internal Radioactive Tracer Survey
A .. Temperature Anomaly Survey
D.. Dilferential Temperature T èSt
INTERVAL Codes
I .. Initial Test
4.. Four Year Cyde
V.. Required by Variance
T" Test during Workover
o .. Other (describe in notes)
/I
~
\ , \
MIT Report Form
Revised:'06I19102
MIT_Granite Point PIatfòrm_ MM-DO-YV
,
j
\ I
I ¡
~CI-I Injectivity Test Pro.
Page 1 of 1
.
Maunder, Thomas E (DOA)
From: Lambert, Steve A [salambert@chevron.com]
Sent: Wednesday, August 22, 2007 11 :35 AM
To: Maunder, Thomas E (DOA)
Subject: MUCI-1 Injectivity Test Procedure
Attachments: MUCI-1 Injectivity Test 8-07,doc
«MUCI-1Injectivity Test 8-07.doc» Tom this is the planned procedure for the MUCI-1 injection test.
8/22/2007
.
.
MUCI-1 Iniectivitv Test
Purpose: Determine if well MUCI-1 can be used as a waterflood well.
Injection rates required are 250 BWPD.
Contact: Steve Lambert: office (263-7658) home (339-2302) cell (952-4297)
Conduct a pre-job safety meeting with foreman, operators and roustabout crews.
This job could require extremely high injection pressures. All injection lines need
to be clearly marked.
1.) Record tubing, 9 5/8" casing and 13 3/8" casing pressures.
2.) Rig up high pressure pump and surface injection lines.
3.) Pressure test injection lines to 6,500 psi.
4.) Bleed off pressure, open valve at the wellhead and gradually increase
the injection pressure until injection can be established at the minimum
pump capacity. Do not exceed injection pressure of 6,500 psi.
5.) Continue injection at the minimum rate for 30 minutes. Record the
tubing, casing pressures and injection rate every 15 minutes.
6.) Increase the injection rate by 2 GPM and continue injection rate for 30
minutes. Record the tubing, casing pressures and injection rate every 15
minutes. Do not exceed injection pressure of 6,500 psi.
7.) Increase the injection rate by 2 GPM and continue injection rate for 30
minutes. Record the tubing, casing pressures and injection rate every 15
minutes. Do not exceed injection pressure of 6,500 psi.
8.) Increase the injection rate by 2 GPM and continue injection rate for 3
hours. Record the tubing, casing pressures and injection rate every 15
minutes. Do not exceed injection pressure of 6,500 psi.
9.) Rig down equipment and backflow tubing and casing so that tubing and
casing pressures are less than 100 psi.
At the conclusion of the test, send pressure and rate data to Steve
Lambert in the Anchorage office.
800
700
600
500
400
300
200
100
o
1
1600
1400
1200
1000
600
600
400
200
o
1
800
700
600
500
400
300
200
100
o
2000
1500
1000
500
o
MEMORANDUM
)
State of Alaska
')
Alaska Oil and Gas Conservation Commission
TO:
Jim Regg '(7, '2) 4/0"'-
P.I. Supervisor '"'{?fq -12 ~
DATE: Friday, March 18, 2005
SUBJECT: Mechanical Integrity Tests
UNION OIL CO OF CALIFORNIA
MUCI-l
GRANITE PT ST 18761 MUCr-l
G'
M; .,:, ,,'it
\~f\Ìf IV
FROM:
Lou Grimaldi
Petroleum Inspector
Src: Inspector
Reviewed By:
P.I. suprv3Cf-.-
Comm
NON-CONFIDENTIAL
Well Name: GRANITE PT ST 18761 MUCI-I
Insp Num: mitLG050317153959
Rei Insp Num:
API Well Number: 50-733-20173-00-00
Permit Number: 169-009-0
Inspector Name: Lou Grimaldi
Inspection Date: 3/17/2005
Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min.
Well MUCI-l Type Inj. N TVD 9037 IA 1100 2500 2500 2500
P.T. 1690090 TypeTest SPT Test psi 2259.25 OA 180 400 400 400
Interval 4YRTST P/F P Tubing I 1500 1500 1450 1450
Notes: IA had 2000 psi on it when I arrived. Had operator bleed IA to 1100 psi and observed for 30 minutes with no change. Pressured IA back up to
2500 psi for test.
//1 0
<)þ'r
SCANNED J\PR 25 20DS
Friday, March 18, 2005
Page 1 of 1
¢
MEMORANDUM
State of Alaska
Alaska Oil and Gas Conservation Commission
TO: Cammy O. Taylor
Chair
DATE: September 26, 2002
SUBJECT: Mechanical Integrity Tests
THRU: Tom Maunder
Petroleum Engineer
FROM: Lou Gnmaldi
Petroleum Inspector
NON- CONFIDENTIAL
UNOCAL
Baker Platform
Be-,4, 16, 17, 23
Middle Ground Shoal Field
Packer Depth Pretest Imbal 15 MIn 30 Min I
I Typelnj.I S I TV. D J 4621 I Tubing J 2950 ] 2950 I 2500 J 2550 I lntervalJ 4 ~
'.".i..Notes:P'T'D'IWelII 1690090Ba'4 ITypetestl P ITestpsil 1155 I Cas,ngI 1550 I 1050 I 1050 I 1050I p/FI p/_
WellI Sa-16 I Typelnj I S I TV.D. I 5067 I Tubing I 1050 I 1050i iI lntervall 4
'" P.T.D.I 1770170 ITypetestl P ITestps,I 1267 I Cas, ngI 41o I 1~°1 164°1 165°1 P/F I P--
Notes:
WellI Ba-17
PTDI 1852170
Notes:
WellI Ba-23
P.T.D.I 1840110
Notes:
TypetestI P ITestps,I 1320 I CasingI 600 1155011510115001 P/F I P
Type,nj I S I T.V.D. 18212 I Tub,ngl30~0 13050 13050 13050 I,nte~va, I 4
Type testI P I Testpsil 2053 ICasingI 300 I 2170 I 2150 I 2140 I P/F I P
Type INJ Fluid Codes
F = FRESH WATER INJ
G = GAS INJ
S = SALT WATER INJ
N = NOT INJECTING
Type Test
M= Annulus Momtonng
P= Standard Pressure Test
R= Internal Rad~oacbve Tracer Survey
A= Temperature Anomaly Survey
D= D~fferenbal Temperature Test
Interval
I= Imt~al Test
4= Four Year Cycle
V= Required by Vanance
W= Test dunng Workover
O= Other (describe m notes)
Test's Details
I arrived the platform and was met by Mike Lott (operator) who provided me with the well info. We tested four wells
today with all passing their tests.
I toured the platform during the tests and found it to be in good condition considering the reduced personel.
M IT's performed Four
Attachments.
Number of Failures' None
Total T~me dunng tests 4 hours
cc: Chris Myers
Steve Meyer
MIT report form
5/12/00 L G
MIT MGS Baker 09-26-02 LG.xls
9/27/2002
April 16, 1990
Alaska Oil & Gas Ccnse~zation
3001 Porcupine Dr.
Anchorage, AK 99504
~....~.: Ms. Elaine Johnson
Dear Ms. Johnson:
I have a~tached surface survey locations of the "Legs" and
conductors for t~he four platforms in t. he Trading Bay Unit as we!! as
the Union Oil-operated Monopod and Granite Poin= Pla=forms. I was
unable to locate any Dlats from a regisnered surveyor but I hope
t,~is will meet your needs.
Yours very
Regional Drilling Manager
GSB / lew
( ('
GRANITE POINT PLATFORM FROM NW CORNER OF SECTION 13, TION, R12W
CONDUCTOR
Leg~l-
Leg#2'
Leg#3'
Leg#4:
"Y" COOR. "X" COOR. WELL # FSL
2,544,566.00 263,297.33
2,544,572.08 263,294.75 13-13 2371
2,544,572.41 263,299.33 44-14 2373
2,544,569.75 263,302.99 33-14 & RD 2371
2,544,565.34 263,303.99 31-23 2366
2,544,561.34 263,302.08 31-14 & RD 2362
1 & 2
2,544,599.42 263,297.83 44-11 & RD 2360
2,544,560.67 263,293.33 Open
2,544,564.50 263,290.83 12-24 2363
2,544,569.00 263,291.42 32-23 & RD#2 2368
2,544,610.00 263,364.00
Compressors
2,544,543.33 263,408.00
2,544,548.16 263,403.42 31-13 2382
2,544,549.91 263,407.59 22-13 ' 2379
2,544,548.66 263,412.00 MUC#1-1 2391
2,544,544.99 263,414.41 MUC#I-2 2386
2,544,540.42 263,413.91 32-13, 33-13 2390
2,544,537.25 263,410.58 24-13 & RD 2392
2,544,537.00 263,406.09 42-23X, 31-23 2380
2,544,539.58 263,402.42 11-24 2383
2,544,544.08 263,401.42 11-13 2379
2,544,499.58 263,341.33
FEL
1267
1262
1258
1256
1258
1261
1269
'1269
1370
1375
1379
1381
1379
1376
1371
1368
1375
STATE OF ALASKA ~
ALASKA ,L AND GAS CONSERVATION C ,.,,vllSSION
SUNDRY NOTICES AND REPORTS ON WELLS
1 DRILLING WELL []
COMPLETED WELL []
OTHER
2 Name of Operator
UNION 0IL COMPANY OF CALIFORNIA
3. Address
PO BOX 6247 ANCHORAGE AK 99502
4 Location of Well
2391'S & 1379'E of NW Cot, Sec 13,
TiON, R12W, SM
5 Elevation ~n feet (~nd~cate KB, DF, etc )
KB log' MLLW
12
Lease Des~gnat.on and Serial No
ADL-18761
7 Perm,t
59-
8 APl Number
50- 733-20173
9 Umt or Lease Name
Union-Mobile State #1
10 Well Number
Muci-#1
11 F~eld and Pool
Granite Point
Middle Kenai
Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF
(Submit m Tnphcate) (Submit ~n Duplicate)
Perforate [] Alter Casing [] Perforations ~ Altenng Camng
Stimulate [] Abandon [] Stimulation [] Abandonment
Repmr Well [] Change Plans [] Repairs Made [] Other
Pull Tub,ng [] Other [] Pulhng Tubing ~
(Note Reportmult~plecomplet~onson Form 10-407w~thasubm~tted Form 10-407 for eachcomplet~on)
13 Descmbe
proposed
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
12.
13.
14.
15.
Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any
work, for Abandonment see 20 AAC 25 105-170)
Commenced Operations $ 0001 Hfs. 10-27-84
ND Tree, NU & Tested BOPE
Pulled & Laid down existing 3 1/2" completion assembly.
Ran Caliper Survey f/10470-10000 ft. & f/10630-9500 ft.
Test csg to 1500' psi w/RTTS $ 9985.
Set RBP $ 10,181' DPM w/15 sxs sand on top.
Perf'd f/10131-10133' w/4 HPF.
Set RTTS ~ 9898' DPM & attempt to breakdown
Retrieved PBP ~ 10181'.
Ran 5" Liner f/11222-10092' w/127sxs cl "G"
CO cmt & ran ccl-GR log to bo~em~
Perf'd for production w/4HPF ~1186-11212'
11125-11145'
11110-11121'
11050-11075'
Perfs w/6500' psi - no breakdown.
f/10841-10851'
10815-10825'
10735-10785'
10660-10705'
10535-10635'
Ran 3 1/2" completion assembly, w/packer at 10158' ELM.
Installed BPV, ND BOPE, NU & test wellhead, removed BPV.
Released Rig ~ 2400 hrs. 11-27-84.
RECEIVED
JAN 0 ]985
Alaska Oil & Gas Cons. C0mml
Anchorage
14 I hereby ~t the f~J~l~rS~l(~t¢l c_~orrect to the best of my knowledge
S,gned L'aW~ence~C~' ~-d..~~0.~-C~uttin¢.. T,tle ENVIRONMENTAL TECHNICIAN
The space below for Commms~on use
01-07-85
Conditions of Approval, ~f any
By Order of
Approved by COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1 ~0
Submit "Intentions" ~n Triplicate
and "Subsequent Reports" ~n Duplicate
mion
Umon O~1 and Gas I~ on Western
Region
Umon O~1 Company of Cahfornia
P O Box 6247, Anchorage, Alaska 99502
Telephone. (907) 276-7600
union
January 8, 1985
Hr. Chat Chatterton
AK. Oil & Gas Conservation Commission
3001 Porcupine Drive
Anchorage, AK 99504
Dear Hr. Chatterton:
Attached is a Sundry Notice Subsequent on Huci-#1 for your information and
file.
LOC/tj
Attachment
Very truly yours,
Lawrence O. Cutting
Environmental Technician
RECEIVED
JAN 1 0 1~B5
AlasKa 0il & Gas Cons. Commission
Anchorage
' ALASKA .L_AND GAS CONSERVATION C ,,,,VIISSION
MONTHLY REPORT OF DRILl. lNG AND WORKOVER OPERATIONS
Drdhng well []
Workover operauon []
2 Name of operator
UNION OIL COHPANY OF CALIFORNIA
3 Address
PO 80X 6247 ANCHORAGE AK 99502
4 Location of Well
at surface
7 Permit No.
69--~ ?
8 APl Number
$o- 733-20173
9 Un,t or Lease Name
UNTON HOBILE STATE
2391'S & 1379'E of NW Cor, Sec 13, TlOn, R12W, SM
5 Elevation In feet (,nd~cate KB, DF, etc ) I 6 Lease Designation and Serial No
KB 106' MLLW I ADL 18761
10 Well No
GPS MU£T-1 ,
11 Field and Pool
Granite Point
Niddle Kenai
For the Month of. November , 19 84
12 Depth at end of month, footage drdled, flsh,ng jobs, dlrect,onal dr,lhng problems, spud date, remarks
Released Rig ~ 2400 HRS 11-27-84
13 Casing or liner run and quantities of cement, results of pressure tests
Ran 5" scab liner f/10092' - 11222' w/127 sxs CL "G"
14 Coring resume and brief descrlpuon
NONE
15 Logs run and depth where run
Caliper Survey
Caliper Survey f/10630' - 9500'
GR-CCL Log
Alaska Oil & 6~,,.
1 6 DST data, perforating data, shows of H2S, m~scellaneous data
Perf'd ¢/10131' - 10133' w/4HPF
11186' - 11212' w/4HPF
11125' - 11145' ~/4HPF
11110' - 11121' ~/4HPF
11050' - 11075' w/4HPF
Perf'd f/10841' - 10851' w/4HPF
10815' - 10825' w/4HPF
10735' - 10785' w/4HPF
10660' - 10705' w/4HPF
10535' - 10635' w/4HPF
17 I hereby certify that the foregoing ~s true and correct to the best of my knowledge
' ~/' ~:' N 12/10/84
LSIGNED g-~C L , TITLE'"~L~NVIRONMENTAL TECHNICIA_ DATE
NOTE--Report on th,s form' i~'/reclu,red fo.,r,~ach calendar month, regardless of the status Of operations, and must be filed ,n dupl,cate w~th the Alaska
Otl and Gas Conservation Commission by ~'M~ 15th of the succeeding month, unless otherwise d~rected.
Form 10404 Submit tn d~Jpl,cate
Rev 7-1-80 . f
Umon Od and Gas Diws't't ~/estern Region
Umon Od Company of CalIfornia
P 0 Box 6247, Anchorage, Alaska 9950;'
Telephone (907) 276-7600
union
December 13, 1984
Mr. Chat Chatterton
Ak Oil and Gas Conservation Commission
3001 Porcupint Drive
Anchorage, AK 99501
Dear Mr. Chatterton: ·
MONTHLY REPORTS
Attached are Monthly Reports for KTU 13-5, GPS 32-13 GP.S'MUCI-1, KU 43-12, and
TBU D-43 for you information and file.
If you have any questions, please feel free to contact me at the telephone
number listed above.
LOC/tj
Attachments (5)
Very truly yours,
Lawr ce~O,O, Cutting
ENVIRONMENTAL TECHNICIAN
RECEIVED
O Ec ! ? 1984
Alaska 0~1 & Gas Cons. Commission
Anch0~ age
L AND GAS CONSERVATIOn' iMISSION ~ ~
MONTHLY REPORT OF DRILLING AND WORKOVER OPERA'F
2 Name of operator 7 Perm,t No
UNION OIL COMPANY OF CALIFORNIA 69-6
3 Address 8 APl Number
P0 BOX 6247 ANCHORAGE AK 99502 50- 733-20173
9 Umt or Lease Name
UNION MOBILE STATE
4 Location of Well
at surface
2391'S & 1379'E of NW Cor, Sec 13, TiON, R12W, SM
5 Elevation in feet (indicate KB, DF, etc ) 6 Lease Designation and Serial No
KB 106' MLLW
ADL 18761
10 Well No.
GPS MUCI-1
11 Field and Pool
GRANITE POINT
MIDDLE KENAI
For the Month of. OCTOBER , 19 8Zt
12 Depth at end of month, footage drdled, hsh~ng jobs, d~rect~onal drdhng problems, spud date, remarks
Commenced Operations ~ 0001 hrs. 10-27-84
EOM = 10665' TOF / 15715' TD
Recovering Fish
13 Casmg or leer run and quantities of cement, results of pressure tests
NONE
14 Cormg resume and brmf description
NONE
15 Logs run and depth where run
NONE
16 DST data, perforating data, shows of H2S, miscellaneous data
NONE
RECEIVED
NOV
Alaska Oil & Ges Cons. Comm;ssio~
Anchorage
17 I hereby cert,fy that the forego,ng ~s true and correct to the best of my knowledge
SIGNED¢~~_~~ ~ TITLE ENVIRONMENTAL TECHNICIAN
11/14-84
DATE
NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operations, and must be hied ,n duphcate w,th the Alaska
Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherw,se directed
Form 10-404 Submit in duphcate
Rev 7-1-80
t' '~ STATE OF ALASKA ,,r'r~
ALA& . .~IL AND GAS CONSERVATIOE ...,MMISSION
SUNDRY NOTICES AND REPORTS ON WELLS
1. DRILLING WELL []
COMPLETED WELL
OTH ER []
2 Name of Operator
UNION OIL COMPANY OF CALIFORNIA
3 Address
4 Location of Well
p. O. BOX 6247, ANCHORAGE, ALASKA 99502
2391'S & 1379'E of NW Cor, Sec 13,TiON,R12W,SM
5 Elevation in feet (ind~cate KB, DF, etc )
,/D ln~lMI I ~/
12
6 Lease Designation and Serial No
ADL-1876]
8 APl Number
5023:)-20173
9 Unit or Lease Name
Union-Mobil State #1
10 Well Number
GPS MUCI-1
11 F~eld and Rool
Granite Roint
Middle Kenai
Check Appropriate Box To Indmate Nature of Not~ce, Report, or Other Data
NOTICE OF INTENTION TO SUBSEQUENT REPORT OF
(Submit m Tr~phcate) (Submit ~n Duplicate)
Perforate []X Alter Casmg [] Perforat,ons [] Altenng Casmg []
Stimulate [] Abandon [] Stimulation [] Abandonment []
Repmr Well [] Change Plans [] Repairs Made [] Other []
Pull Tubing F-IX Other [] Pulling Tubing []
(Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion )
13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertment dates, mclud~ng estimated date of starting any
proposed work, for Abandonment see 20 AAC 25 105-170)
1. Rig up, kill well, remove tree, install and test BOPE to 3000psi.
2. Rull and lay down existing 3 1/2" single completion assembly.
3. Run 7" scraper to top packer at lO120'. Circulate clean.
4. Set packers at±lO,120', 10,470', & 10,970'.
5. Reperforate "C" zone f/+ll,220-11,O00.
6. Reperforate "B" zone f/'~lO,900-10,500.
7. RIH with 7" scraper and-2 3/8" tubing tail and circulate clean.
8. Rick up and run new 3 1/2" completion assembly.
9. Remove BORE, install tree, and return well to injection.
RECEIVED
Work Reported
141 hereby~f6 re~r~ m~~ n owledge
$,gne~.~'~r~''~'' 5m ~R. C-~CE~Jm'""""~'~T:ie DISTRICT DRILLING SUPT.
The~JSace below for Commission use
AUG i 6 1984
Alaska Od & Gas Cons. CommWsio~
Anchorage
Date 08/15/84
Conditions of Approval, if any
Approved Copy
,~ Returned
,RIG]MAL SIGNED , ~"-2o,~¢
lit LOt~NIE C. SMIT8
, By Order of
Approved by. COMMISSIONER the Commission
Date
Form 10-403
Rev 7-1 ~0
Submit "Intentions" ~n Triplicate
and "Subsequent Reports" ~rt Duplicate
GRAAIITE POINT MU I?'
PROPOSED WELL COMPLETION
18' C 437'
13 3/8' C 5973'
Packer at 10,120'
Damaged 7' Casing at 10,210'
Packer at 10,470'
Packer at 10,970'
1/2' Tubing to 11,003'
PBTD I 1,219'
7' C 11,234'
9 5/8' C 11,257'
TD 15,715'
PERFORATIONS
10,535'-10,635'
10,660'-10,705'
10,735'-10,785'
ZONE
10,815'-10,825'
10,841'-10,851'
I 1,050'-11,075'
11,100'-11,145'
I 1,186'-11,216'
ZONE
RECEIVED
AUG 1 6 1984
Alaska Oil & Gas Oons. Commission
Anchorage
.o
November 17, 1980
Mr. George Stadnicky
Union Oil Company cf California
P. O. Box 6247
Anchorage, Alaska 99505
Re: Preparation of Petrographic Thin-Sections
of Cores from State Well Sample Library.
Dear George:
Pursuant to our November 13, 1980 discussion on the captioned
subject, petmfssign is hereby granted to Union Oil Company of
California to cut a maximum of 1 cc. of core material per foot
of core from the State's set of core chips from the following
wells for the sole purpose of preparing thin-sections within
the designated intervals, subject to the conditions set forth
below:
Sample
Set No Well Interval
174
81
124
48
109
215
17
63
93
Amoco Albert Kaloa #1
Amoco MGS 17595 #4
ARCO W. Foreland Unit #3
Pan Am Tyonek St. #1
SOCAL Naptowne Unit #24-8
Union Granite Pt. MUC I-1 [
Halbouty Ak D&M King Oil #I-B
Pan Am MGS 17595 92
Mobil Granite Pt. 91
13,067' - 13,078'
7,340' - 8,196'
9,170' - 9,286'
12,832' - 12,488'
13,072' - 13,108'
12,975' - 13,017'
13,300' - 13,439'
10,554' - 10,557'
11,245' - 11,257'
Cuts from the State's set of core chips are to be made only out
of those individual envelopes or bags in which the total volume
of core material is greater than 10 cc. Union will provide the
State with a list of the specific core footages from which
material was extracted.
Union shall bear all costs entailed and will provide Alaska Oil
and Gas Conservation Commission with a complete set of all
thin-sections prepared. All thin-sections and all core residue
materials are to be received by the Commission by approximately
February 15, 1981. No core material is to be retained by Union.
Mr. George Stadn( cy -2- ~
November 17, 1980
Ail materials are to be transmitted direct to the Commission
and are not to be examined by outside parties.
We are pleased to work with you in this mutually beneficial
endeavor and look forward to your company's continued exercise
of care and good judgement in the handling of this limited
quantity of well material. I know we both understand that the
State's we1! sample library is public property and that grant-
ing Union permission to extract portions of material from this
library for the purpose of preparing the indicated thin-sections
enhances the value of the library and is in the public interest.
Very truly y,,ours,
William Van Alen
Petroleum Geologist
cc:
Mr. Art Trevena
Union Oil Co. of Calif.
P. O. Box 76
Brea, California
~";A ~ be
ERiCAN FETROLEUM CO O &TION
$£CURITY LIFE BUILDING
DENVER~ CO[ORAi)O 80202
~a~ 12, ~970
~*. ~. JON~
1'. M. Cuarm
/tr. C. C. Woodruff
Division Enginee~
Mobil O£1 Corporation
P. O. Box 173q
Anchorage, Alaska 99501
Dea~Mr. Woodz.~ff~
In mesponso to your letters of April 17 and May 1,
1970, you have oum concurrence, as operator of ~he Chakacha~ma
~oup, to the conversion of s~.Mobil~ted G~an~te Poht
Wells~ 2~13, 12-2~, ~2-23X, 33 lq,~~d M~ 1-2, ~
p~uctng to wate~ ~ction status.
Yours very truly,
M~. 'F. L. F:~anz
Skelly 0il Company
1088 Lincoln Towe~ Building
Denver, Colorado 80203
Mr. H. W. Patterson
Phillips Petroleum Company
1300 Security Life Building
Denver, Coloz, ado 80202
M~. Ralph Cox '
Atlantic R/chfield Company
P. O. Box 360
Anchorage, Alaska 99501
JUN 22 1970
DIVISION OF OIL AND OAS
AN~NORAOl
Form
REV. 1olO-73
- f
Submit "1 ntentions" In Triplicate jr
& "Subsequent Reports" in Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to drill or to deepen
Use "APPLICATION FOR PERMIT---" for such proposals.)
1. OIL [---1 GAS D
WELLL._J WELL OTHER WATER INOECTOR
2. NAME OF OPERATOR
UNION OIL CO. OF CALIFORNIA
~. ADDRESS OF OPERATOR
P.O. BOX 6247,
4. LOCATION OF WELL
At surface
2381' S & 1379' E from N.W. corner,
ANCHORAGEs ALASKA 99502
Leq #3, Conductor #3
13. ELEVATIONS (Show whether DF, RT, GR, etc.)
Sec. 13 ,TION,
R12W, S.M.
KB 95' above MSL
14.
Check Appropriate Box To Indicate Nature of Notice, Re
5. APl NUMERICAL CODE
50-133-20173
6. LEASE DESIGNATION AND SERIAL NO.
ADL 18761
7. IF INDIAN, ALLOTTEE OR TRIBE NAME
8. UNIT, FARM OR LEASE NAME
UNION-MOBIL STATE #1
9. WELL NO.
MUC I-1
10. FIELD AND POOL, OR WILDCAT
GRANITE POINT - MIDDLE KENAI
11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE)
Sec. 13, T1ON, R12W, S.M.
12. PERMIT NO.
69-9
3orr, or Other Data
NOTICE Of INTENTION TO:
TEST WATER SHUT-OFF
FRACTURE TREAT
SHOOT OR ACIDIZE
REPAIR WELL
(other) CHANGE OF
PULL OR ALTER CASING
MULTIPLE COMPLETE
ABANDON*
CHANGE PLANS
?0R
SUBSEQUENT REPORT OF:
WATER SHUT-OFF ~ REPAIRING WELL
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
(NOTE., Report results of multiple completion on Well
ComDletion or Recompletlon Report and Log form.)
15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, incluchng estimated date of
starting any proposed work.
FROM-
TO'
MOBIL OIL CORP.
UNION OIL CO. OF CALIFORNIA
RECEIVED
16. I hereby certify that the foregoing is true and correct
~ ' G N ~~ ~, -- ~ ..... ~ -- ~~''~' '~ ~ , .... T' T LE DISTRICT DRILLING SUPT'
(This ;~',eJ~[~ate office use)
DATE~
APPROVED
CONDIT IONS O/~,/APPROVAL, q F ANY:
TITLE
See Instructions On Reverse Side
DATE
Approved Copy
Returned
Form P--3
REV 9-30-69
S~bmit "Intentions" in Triplicate
& Sul~equent Reports ' m Duplicate
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to dllll or to deepen
Use APP-LICATION FOR PEI~I~Ir--" for such pro~osals )
I
0IL ~ GAS ~-~ OTHER
WELL WmLL Water Injection
2 NAME OF OPERATOR
Mobil 0il Corporation
3 ADDRESS OF OPERATOR
P. 0. Path 7-003, Anchorage, Alaska 99510
4 LOCATION OF WELL
At surface
2391' S and 1379' E of NW Corner Sec. 13,
TiON, R12W, S.M. Leg 3, Conductor 3.
13 ELEVATIONS (Show whether DF, RT, GR, ere
106' KB
14
5 APl NUIVIF_,~CAL CODE
50-133-20173
6 LEASE DEF~GNAT/ON AND SERIAL NO
ADA - 18761
ADL- 18742
7 IF IiN'DIA.N, AJ-J.,OTTEE OR TRIBE NA/VLE
$ UNIT, FA~.M OR LEASE NAME 18742
Mobil-Union State ~1 & Gr. Pt.
9 WELL NO
Mac I- 1
.,
10 FIELD A.ND POOL, OR WILDCAT
Middle Kenai
n SEC, T, R, m, (BOttOM HOL~.
°mEcrIVE~Lease Line 500' west
of NE Corner Sec. 13, T10N,R12W,
12 PER1VLIT NO ~J, M.
69-9
Check Appropriate Box To I,nd}cate Nature of NOtice, Re, tort, or Other D~ta
NOTICE OF INTENTION TO:
TEST WATEB SHUT-OFF PULL OR ALTER CA~INO
FRACTLRE TREAT MULTIPLE COMPI RTE
8H00T OR ACIDIZE -- ABANDON·
REPAIR %',ELL CHANOE PLAN8
~Other)
SUBSEQUENT REPORT OF:
WATER SIIUT-OFF REPAIRING WELL X~
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ~ ABANDO~MEKT$
(Other)
(NOTE' Report results of multiple completion on Well
Completion or Reeompletion Report and Log form.)
15 D~SCRZBE I'nOPOSZD OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent crates, including estimated date of starting an~
proposed work.
Based on our 'notice of intention'
acidizing the subject well, the well is repaired and acidized.
, dated May 15, 1972, for repairing and
Complete workover history of repair and acidize is attached.
SIGNED~_- ' t '6~.S~~- ~'~/-~'~--- TITLE Division Engineer
(This space for S ate ottice i f
APPROVED BY TITLE
CONDITIONS OF APPROVAL, IF ANY:
DATE ,T~ly 26. l Q7P
DATE
See Instructions On Reverse Side
(
WORKOVER AND AC ID
STIMUIATION HISTORY
GRAnitE POINT WIW MUC-I #1
JIRVE 14, '72 to JIRVE 16, '72: Rigged up. Installed BOP. Tested gates and
choke to 3000 psi and Hydril to 2000 psi.
to JUEE 17~ '72: Worked tubing up to 180,000~ - freed tubing.
POH. Could not find any visual leaks.
Tested blind rams to 3000 psi.
DIVISION OF OIL 10,'9 ,t,~)t
to JUNE 27, '72: RI/{ with 8~a" bit and 9 5/8" casing scraper on
3 - 4 3/4" DC and 3½" DP. Had to work bit
and scraper through tight spot in 9 5/8"
casing at 5961'-5969' for 1 hour (10,000 to
20,000~ drag). Ran bit to 10,470' top of
permanent packer. Circulated for 2½ hours.
POH with bit and scraper. Ran 8 3/8" OD
packer picker to 5961' - unable to get
through tight place (worked for 4 hours).
P0H with packer picker. Ran 8~" Bowen
casing roller on BS jars, 6 - 4 3/4" DC and
3½" DP to 5960'. Rolled 5960'-61' for 2½
hours without any progress. POH. Ran 8~"
casing swedge on same hook-up, stopped at
5960'. Swedged 5960'-62' in 4 hours, could
not go below 5962'. POH. Ran 6" RB and 7"
casing scraper to 6113' without any trouble.
POH. Ran Tri-State string tapered mill, 8½"
x 7" taper with 6½" OD 24" long bull nose.
Milled 5960'-5965' in 1 hour. Ran mill
through tight spot several times (free).
Ran to 6055'. POH. Ran Tri-State 8 3/8"
OD packer picker, went through tight spot
OK, milled on packer 10,470'-73' for 8
hours. POH with packer (tight at 6082').
Lost packer at 60' and re-engaged; left
bottom slips in hole. Ran 7 5/8" OD magnet
for slips and junk. Stopped at 10,610',
worked and circulated. Unable to go deeper.
POH~ recovered small pieces of metal. RIH
with v~ RB and 9 5/8" casing scraper to
10,607'. Worked bit from 10,607' to 10,620'.
Could not go below 10,620'_,,6 POH with bit and
casing scraper. RIH with bit and 7"
casing scraper to top of bottom packer at
10,974' · Hole was clear. Circulated bottoms
up. POH. RIH with 8 3/8" OD bull nose
tapered mill to 10,595' · Milled from 10,595'-
10,615' in 7 hours. POH with mill. Redressed
(Continued on Page 2)
-2-
mill and reran on the same hook-up. Redrilled
10,595-10,615' in 4 hours. Milled at 10,615'
for 1 hour without any progress. ?OH. Ran 8"
tapered swedge on same hook-up. Attempted to
swedge without any progress. Swedge was
sticking. Worked 1½ hours to pull loose.
POH. Ran 8 3/8" OD tapered mill. Milled
10,609'-10,619' in 16~a hours. POH. Ran
7 3/4" OD bull-nosed tapered mill to top of
packer at 10,963' (at 10,973' by DP meas.).
~-,1 f!
POH, recovered a piece of packer 7~u
OD
X
6 3/8"ID x 4" long. RIH with 8 3/8"
OD
tapered mill, stabilized, to 10,624'. Milled
10,624'--10,632' in lO~a hours. Fell free. Ran
to bottom, tagged packer at 10~973' ·
Circulated, POH. RIH with 8 3/8" OD packer
picker on BS, jars, 6-4 3/4" OD DC and 3½"
DP. Milled on Otis 9 5/8" packer 10,970'-
10,973' for 2 hours. Jarred packer loose,
POH. Recovered packer; left in hole bottom
slips, one-half of packer rubber, and scraper
ring. RIH with 8~a~'' RB, 9 5/8" casing scraper
on same hook-up. Tagged junk at 10,065'.
Pushed junk to 11,217' in 2 3/4 hours. Worked
on junk at 11,217' for 3½ hours without any
progress. Circulated hole, increased pH with
caustic.
DIVISION OF OiL r~,~"D ('~
to JUNE 29, '72: Ran 268 joints of 7" casing with 5 slim hole
centralizers at 10,546', 10,503', 10,460',
10,417' and 10,374', differential collar at
11,144' and float shoe at 11,234'. Circulated
hole with injection water. Cemented 7" casing
inside 9 5/8" casing with 250 sx. class 'G'
cement premixed with 1~ CFR 2 and 16% salt.
Mixed cement with filtered inlet water (slurry
weight 16~/gal. ). Used top and bottom plugs.
Displaced with 415 bbls. filtered inlet water
using rig pump at 5 bbls./min. Bumped plug
with 2000 psi. Landed 7" casing on OCT slips
40' below KB. Nippled up 13 5/8" x 6" x 5000
psi tubing head hanger. Tested well head to
5000 psi. Installed 6" x 13 5/8" cross-over
spool. Nippled up 13 3/8" BOP equipment.
Tested BOP rams and manifold to 3000 psi and
Hyd~il to 2000 psi.
(Continued on Page 3)
-3-
to JUNE 30, '72: RIH with 6" bit and 7" casing scraper. Drilled
collar and hard cement 11,144' to 11,219'.
Circulated hole. Tested casing and shoe to
3000 psi. POH.
to JULY 1, '72: Dresser-Atlas ran GR - CCL and logged from 11,217'
to 9700'. Correlated with original log.
Perforated 215' of 'B' zone and 100' of 'C' zone
with ~60 perfs and 400 perfs respectiYely, using
Jumbo Jet at 4 shots/ft.
to JULY 1, '72: Ran 6" RB and 7" casing scraper to 11,219'.
Reverse circulated hole. POH.
to JULY 2, ~72: Dresser-Atlas set two Otis 7" x 4" bore perma
packers at 10,970' and 10,470' on wire line.
to JULY 5, 72: Ran .~ tubing with bottom hole assembly,
hydrotesting to 7500 psi (found total of 9
leaks - replaced 6 joints of tubing and 9
collars), to 10,460'. Displaced tubing with
filtered injection wa%er. Tested 7" x 3½"
annulus. Commenced leaking with back flow
through tubing at 2000 psi. Tested inside of
tubing to 3~00 psi/OK. ?OH. RIH again with
tubing assembly, testing externally to 7500 psi-
(found 22 leaks - replaced 2 joints of tubing
and 7 collars). Tested annulus to 4000 psi/OK.
Tested 3½" tubing to 4000 psi/OK. Injected into
'C' zone at 8 cu. ft./min. @5500 psi for 30 min.
and at 6 cu. ft./min. ~6000 psi for 10 minutes.
Removed BOP. Installed xmas tree.
STATUS OF WELL AS OF JULY
1972
T.D. 15,715'
13 3~8" Casing shoe 5,973'
9 5/8" Casing shoe 11,257'
7" Casing shoe 11~234'
7" Casing details as follows(bottom to top):
48 jts., 29#, N-80, X-Line 2043'
' 158 jts., 23~, N-80, Buttress
~ ~ 2-~ jts. Total
;~11~ ~ ~]/~ Landing joint
Howco Float Shoe at
DIV~S!ON OF OIL /~ .~0 ~?~.~/~ Howco Differential Collar at
2492'
6693'
11,229'
5'
11,234'
11,114'
(Continued on Page 4)
-4-
?BTD 11,219'
Perforations (4 Jumbo Jet shots/foot):
"B" ZONE -
"C" ZONE -
10,535'-10,635
10,660'-10,705
10,735'-10,785
lO,815'-1o,825
10,841'-10,851
11,050 '- 11,075
11,100' -11,145'
11,186 '-11,216'
Tubing - 337 joints of 3½", 9.2~, N-80, special clearance
Buttress, plus 3 pup joints. Located on top
packer and pulled up one foot. Assembly as
follows (KB 38'):
(a) Mule shoe guide
(b) Otis 2~a" 'N' landing nipple,
2. 208" ]D
(c) 30' seals 4" OD x 3" ID
(d) 2 3/4" OD X-O sleeve, 2. 313"
ID (closed)
(e) 2 3/4" OD X-O sleeve, 2.313"
ID (closed)
(f) 32' seals 4" OD x 3" ID
(g) Otis locator sub
(h) Otis 'X' nipple 3½" OD x 2.75"
11,007'
11,005'
10,967'
10,956'
10,518'
10,470'
10,469'
436'
AC ID STIMULATION:
JULY 5, '72 to JULY 6, '72: Tested Dowell lines to 6200 psi. Started
acidizing 'C' zone at 1:50 P.M. on 7- 5-72
Acidized in two stages each of 4000 gals.
mud acid with treating pressure 5900-6000
psi and injection rate 0.7 to 2.8 BPM.
Job completed at 7:14 P.M. on 7-5-72.
Injected 2500 bbls. of water in 'C' zone
at a rate of 4500-3200 BPD ~6400-6600 psi.
to JULY 8, '72: Otis ran plug to isolate 'C' zone. Plug
stopped at 10,000'. Attempted to work
down without any success. Sheared off
from plug at 10,000'. Pumped plug in
place to 'N' nipple at 11,005'. Checked
with Otis line/OK. Opened X-O sliding
sleeves, to 'B' zone, at 10,518' and
10,956'. Tested Dowell lines to 6000 psi.
DIViSiON OF O~L ' .D
~t,~CF,;r~,~, ~ ~.
(Continued on Page 5)
-5-
to JULY 8, '72:
(~ontinued)
Started acidizing 'B' zone at 9:49 P.M. on
7-6-72. Acidized in four stages each of
4000 gals. mud acid, as per program.
Treating pressure varied from 4800 psi to
3600 psi at rates varying from 5.6 BPM to
4.5 BPM. Recorded good pressure - rate
responses on all st~a~es. Job completed at
11 P.M. on 7-6-72. Injected 4400 bbls. of
water at a final rate of 6000 B/D at 6100
psi.
to JULY 16, '72: Otis ran retrieving tool to recover plug
from 'N' nipple. Recovered top one-half
of plug, leaving bottom one-half with ~
ID hole. Ran ball valve, set in 'X'
nipple at 436'. Commenced injection.
Due to reduced rate of injection, decided
to perforate bottom part of tubing for
providing more area of fluid going out to
'C' zone. Rigged up Dia-Log. Perforated
1,,
~ tubing at 11,004' with 5 jet shots
(3/8" holes). Returned well to injection.
PKPaul/mw
July 26, 1972
DIVISION OF OiL
I ors
R~EV 9o$0-69
S~brnit "Intentions" in Triplicate
& 'Sut~equent l%eports" m Duphcmte
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMI'I'I'EE
SUNDRY NOTICES AND REPORTS ON WELLS
(Do not use this form for proposals to dtHI or to deepen
Use APPLICATION FOR 9El~-Vilr--" for such proposals )
AP1 NU~LF.I~CAL CODE
50-133-a0173
6 LEASE DESIGNATION AND SEll/AL NO
ADL 18761
ADL 18742
1 7 IF INDIAN, ALLOTTEE OR TFLIBE NAI%IlS
O,L ~q 0A, Water Injection ----
WELL WELL ~] OTHER
2 NAME OF OPERATOR
Mobil 0il Corporation
3 ADDRESS OF OPEHATOR
P. O. Pouch 7-003, Anchorage, Alaska 99510
LOCATION OF WELL
At surfa~
2391' S and 1379' E of NW Corner Sec. 13,
TiON, R12W, S.M. l_~g 3, Conductor 3.
ELEVATIONS (Show whether DF, RT, OR, etc
UNIT, FAP~I OR I~F-~%SE NAME 18742
Mobil-Union State #l &Gr.Pt.
9 WI~L,L NO
Muc I- 1
10. FIELD ~ND POOL, OH WILDCAT
Middle Kenai
11 SEC , T, R , M 0 (BOTTOM HOLE
o~Ecr~v~., Lease line 500' west
of NE corner Sec. 13, T10N,R12W,
12 PEPs%lIT NO S eM,
106' KB J 69-9
Check Appropriate Box To Indicate Nature of Notice, Report, or Other Dat~
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF PULL OR ALTER CARING
FRACTLRE TREAT MULTIPLE COMPI,ETE
REPAIR %%ELL CHANOE PLAN8
~Other)
SUBSEQUENT I~BPORTOF:
FRACTURE TREATMENT ALTERING CABIN0
8HOOTING OR ACIDIEING ABAND05MENT*
(Other) .
(No,z: Report results of multiple completion on Well
Completion or Recompletion Report and Log form.)
15 D~SCRIBE PROPOSED OR COMPLETED OPERATIO~,S (Clearly state all pertinent details, and glr~ pertinent dates, lncludinK estimated date of starting any
proposed work.
Survey indicated that in the subject well, leaks exist in tubing and also in 9 5/8"
casing.
It is proposed to repair the well, acidize and resume normal injection.
to begin immediately, on approval.
PROCEDURE
10.
th t ' o is true and correct
16[SIGNEDI hereby certify ~/~~~
(This ipace for State offiee~u~J/~/'~ '
CONDITIONS OF AP~ROV~C, I~ A~: -~'
1. Rig up. Kill well if necessary. Install 3000 psi BOPE.
2. Retrieve all the 9 5/8" packers.
3 Run 2k,, bit and clean out to PBTD at 11,239'. ~ ........
4. Run 7" casing to 11~239' and cement with 250 sx class 'G' ~'-"v~:~.ON O= .... ~
5. Nipple up well head and pressure test 7" casing to 5000 psi. ~ ..x. 'c~.
6. Perforate intervals 10,535'-635', 10,660-705', 10,735'-785', 10,815'-825'
10,841'-851', 11,050'-075', il,100-145', and 11,186'-216' at 4 shots per
foot.
7. Set two permanent packers at 10,970' and 10,470'.
8. Run 3½" tubing and bottom hole equipment.
9. Acidize with 24,000 gallons of mud acid, using diverting technique and
mechanical isolation.
Resume normal injection. Rig down.
Work is
TITLE Division Engineer
Txr£~hief Petroleum Engineer[
nIT~, May 15:1972
· ,
See Instructions On Reverse Side
Approved Copy
Form P--3 (
REV 9-30-6 9
STATE O'F ALASKA
Submit "Intentions" in Trtpll~te
& 'Subsequent Reports" In Duplicate
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WEI. LS
(Do not use this form for proposal~ to dldl or to deepen
Use APPLICATION FOR PEP/ViII'--" for such proposals )
~,'-L -- WEL', '__~ OTHER Water Iniector
2 NAME OF OPERATOR
Mobil Oil Corporation
3 ADDRESS OF OPERATOR
Pnn~_h 7-003_ Anchnvape, .Ala.gka qqs01
4 LOCATION OF %VF__,I~L ~ -
Ats,~,~ace 2391' S and 1379' E of NW Corner Sec.
R12W, S.M. (Leg 3, Conductor 3)
13 ELEVATIONS (Show whether DF, RT, GR, etc
106' KB
13, T10N
Check Appropriate Box To Indicate Nature of N~)tice, Re
(
~ APl NLrM. F_,R/CA3. CODE
50-133-20173
6 LEASE DESIGNATION A_ND SEP,.IAJ_~ NO
ADL 18761
ADL 1874Z
7 IF INDIA_N, A. LLO~ OR TRIBE NAME
8 UNIT, FARM OR LEASE NAME l~o~il Union
]/1 and Gr. Pt. 1874~ate
9 WELL NO
MUC I-1
10 FIELD AND POOL, OR WILDCAT
Middle Kenai
11 SEC, T, R, M ~ (BOTTOI~ Ii{OLE
O~ECnVE) teaseLlne 500' West
of NE corner Sec. 13, T10N,
R12W, SM
12 PEP~IIT NO
69-9
~, or Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF PULL OR ALTER CASINO
FRACTLRE TREAT MULTIPLE COMPI ETE
SHOOT OR ACIDIZE J ] ABANDONs
REPAIR ~ELL CHANGE PLANS __
{ Other)
SUBREQUENT REPORT OF :
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ~ ABANDO~MEI~T*
(Other)
(NOTE' Report results of multiple completion on Well
Completion or Recompletion Report and Log form )
15 D~ SCRIBE PROPOSED OR COMPLETED OPERATIO%S (Clea~ly state all pertinent details, and give pertinent dates, including estimated date of starting an~
proposed work.
In accordance with the approved Notice o£ Intention to repair this welt (dated 12/4/70)
the £otlowing work was completed ...........
!--l C.-GEOt
lZ/ZO-Z3/?o m~ea u~, m~auea ~o~ e~m~men~ ~a ~e~ea ~o ~000 p~i o~. ~
Killed well with injection water weighted to 10~/gat with Calcium Chloride_ ~1,- ENG'~
12/24-25/70 Pulled 3 1/2" tub~g string. Retested BOP pipe rams and bt d r~-EN
to 3000 psi and Hydril to 2000 psi, OK. _/"i>' ...... ., ,.
12/26-27/70 Rolled out tight place /n 95/8" casing £ro~/5961/59655965'J
12/28-29/70 Spotted a 50 sacks Class G cement plug in the 9 5/8" casing with
end tubing at 6518'. WOC 16 hours and tagged top of cement at 6395'. Set
Continued on next page.
16 I hereby c.~~
(Thi~ space for State office u~)
APPROVED BY
CONDITIONS OF APPROVAL, IF AN~:
DIVISION OF OIL AND GAS
ANCHORAGJ
TITLE Division Engineer
DATE Jan. 21, l g7 ]
TITLE
DATE
See Instructions On Reverse Side
Approved Cop~
Returned
Form P--~
STATE OF ~ASKA
Submit "Intentions" in Triplicate
& "Subsequent Reports" m Duphcate
OIL AND GAS CONSERVATION COMMrrrEE
SUNI~Y NOTICES AND REPORTS ON WELLS
(Do not use th~s form for proposals to drtll or to deepen or plug back to a dlfflerent reservoir
Use "APPLICATION FOR PERMIT--" for such proposals )
1
oilWELL [] OAS WELL [~ OT"'' Water Injector
2 NAME OF OPEB~TOR
Mobil Oil Corporation
3 ADDRESS OF OPERATOR
Pouch 7-003, Anchorage, AK
99501
4 LOCATION O'F WELL
At,~rf,ce 2391' S and 1379' E from I~ corner Sec.
T 10 N, R 12 W, S.M. (Leg 3 Conductor 3)
m~
15 ELEVATIONS (Show whether DF, RT, GR, etc
106' Kb
~ API LCAL CODE
50-133-20173
6 ~E DES/GNATION A-ND SEHIAL NO
ADL 18761
ADL 18742
? IF INDIAN, A.LLO'rr~ OR TRIBE NAiVI~
8 UNIT FARM OR LEASE NAME
Mobil-Union State #1 and
,. 'w~gte PoinL 18742
l~JC I #1
10 FIF~.I~ AJND POOL, O1~ WILDCAT
Middle Kenai
11 SEC , T , R , M , (BOTTOM HOI~E
LOB~ECTXV~
ease ~ne 500' West of NE
corner Sec. 13, T 10 N, R12W, SM
12 PEP~MIT NO
69=9
Check ~ia.~e ~0x T° I,nc~t~ 'Nat'ur, of N~ot~ce, Report, or Other l)a~a
NOTICE OF INTENTION TO:
SUBSEQUENT REPORT OF:
FRACTURE TREATMENT ALTERING CASING
SHOOTING OR ACIDIZING ABANDONMENT*
(Other)
NOTE: Report results of multiple completion on Well
ompletion or Recompletlon Report and Log form.)
TEST WATER SHUT-OFF { [ PULL OR ALTER CASING
FRACTLRE TREAT MULTIPLE COMPLETE
REPAIR WELL , CHANGE PLANS
{ O~her)
,
15 DESCRIBE PROPOSED OR CO.MPLETED OPERATIONS (Clea~ly state all p~rtinent details, and give pertinent dates, including estimated date of starting an~
proposed work.
This well has a high pressure tubing leak and an apparent leak in the 9-5/8" casing.
It is proposed to pull the 3-l/2" tubing, locate and repair the 9-5/8" casing by
squeeze cementing, rerun the tubing and place the well back on water injection.
Procedure:
.
2. Pull the 3-1/2" tubing and remove the gas lift mandrels.
3. Locate the casing leak and repair by squeeze cementing,
4. Clean out any fill to 11,257', PBTD.
5. Rerun 3-1/2" tubing and commence water injection.
Kill the well with injection water or salt water as necessary and install B.O.P.s.
TITLE Division Engineer
TITLE
u. ~3. 'WOod-rOt~ , ~ // ./'
Ap~IRo¥~D 2YiThi, ipace for State~ (~~ofl~e use)" ' F'*D~ .
CONDITIONS OF APPRO~AL, iF A~ ~
bf
See lnstructlons On Reverse Side
Approved Copy
Returned
Submit "Imtentlons" in Triplicat~
& "Subsequent l~ports" in Duplicmte
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMrl-rEE
SUNDRY NOTICES AND REPORTS ON WELLS
(D~ not use thru form for proposals to drill or to deepen or plug back t~ a d~flerent relal~0t~
Use "APPLICATION FOR PERMIT--" for such proposals.) ,
0IL
WELL r~. GAS Water Injector
WELL [~ OTHER
2 NAME OF OPEt~ATOR
Mobil Oil Corporation
3 ADDRESS OF OPERATOR
P. O. Box 1734,
Anchorage, Alaska 99501
4 LOCATION OF W~L
At-~urfa~ 2391' S & 1379' E from NW corner Sec. 13,
T10N, R12W, S.M.
(Leg 3, Conductor 3)
13 ELEVATIONS (Show whether DF, RT, GR, etc
106' KB (MLLW)
14
HLB
.,~ stmmmc.~., cons OKG -
50-133-20173 '"~'
;6I-'F'ASEDE~ONATIONA. ND~N0,
~L 18761
ADL 18742
? IF INDIA.N. A_L,I.,OTTEE OR TRIBE NAME
-- FILE
S UNIT, FA.R/VI OR LEASE NA1VIE
Mobil-Union State fbl, Granite Pt.
~ ~ ~o State
MUC~I- 1
10 F~ ~ P~L, OR W~CAT
Gran~e P~. - ~ddle Kena~
11 SE~2, T, R, M, (BOTTOM HOLE
BJEC-nVr~.
ease ~_ne 500' ~est of NE
corner Sec. 13, T10N, R12W, S.M.
12 PER_,MXT NO
J
69-9
~ ~ia~ ~x To I~i~ N~tum ~ ~t;Ce, ~, ~ ~h.er Dat~
NO~IC~ O~ IN~N~0N TO:
TEST WATER SHUT-OFF ~--q PULL OR ALTER CASING
$UBIEQUENT R~PORT OF :
FRACTURE TREAT [J~- MULTIPLE COMPLETE FRACTURE TBEATM'JNT ALTERING CASING
SHOOT OB ACJDIZE ABANDONs SHOOTING OR ACIDIZINO ABANDONMEN'T·
REPAIR WELL CHANOE PLANS (Other)
(Other) Initiate Water Injection (NOTE' Report ~esults of multiple completion on Weli
Completion or Recompletion Report and Log form )
'15 DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Cleatly state all pertine,tt details, and give pertinent dates, including estimated date of starting an)
proposed work.
Refer: Granite Point Field Pressure Maintenance Project
Conservation Order f~76 dated 9-12-69
This well is one of six wells to be utilized as injectors in our water injection pattern.
It is anticipated that production will be terminated and water injection initiated on
approximately July 1, 1970. Injection time and quantities of water injected may be
sporadic until injection rates, pressures and profiles are established. We request
approval to initiate water injection in this well.
RFCf V.FO
·
JUN_ 2 2 1970
DIVISION OF Oil AND GAS
ANCHORAGE
16 I hereby ~re~
W SIGNED ._
DATE 6/19/70
and correct ~_
Division Engineer
(Thla ,pace for Stat~i//Suf) . ///~ ~______~.../~..~ ~,
CONDITIONS oF ~PPROVAL, ~ A~: TITLE
*A. V. Barnett for C. C. Woodruff
DATE
See Instructions On Reverse Side
Approved ~
Returned
~rm No P---4
~ ~-30-67
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMJVdTTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
I
OIL [~ G~S [~
WKLL WELL OTHER
2 NAME OF OP~ATOR
Mobil 0il Coroporation
99501
13, TION, R12W, S.M.
AP1 NUA{ERICAL CODE
3 AD~'RESS OF OPEI%ATOR
P. 0. Box 1734 A~cho~a§e, Alaska
(
SUBMIT I~ DUPLICATE
4 LOCATION OF WELL
(Le§ 3, Conductor 3)
2391'S & 1379'E fr NW Cor. Sec.
50-133 -20173
6 LF~ASE DESIGNATION AXD SEqRIAL NO
ADL 18761 &
ADL 18742
7 IF INDIA),~, ALe'1 1 ~ OR TRIBE NAME
~-z~n;. ~.~.on. LE^S~ t a t e tf~Stae 1
mo~.~.-~nzo~ ~
Granite Poznc 18942
g wELL NO
MUC #I-1
10 ~ ~ND m l~ O %'
~ranzce ~zn~2~~e Kenai
& Wildcat
11 S~ , T , R , M (~OM HO~
o~
Lease line 500'W of NE Cor.
Sec. 13~ TION, R12~, S.~.
69-9
13 REPORT TOTAL DEPTH AT END OF MONTH, CH.A~%'GES IN HOLE SIZE, CASING ANT) CE1VIENTiNG JOBS INCLUDING DEPTH
SET AiWD VOLU1ViES USED, PERFORATIONS, TESTS ANT) RESULTS. FISHING JOB~ JUNK IN HOLE AND SIDE-/qlACKED HOLE
AND A_NY OTHER SIGNIFICANT CHA_NGES IN HOIA~ CONDITIONS
July 1969
Perforated 4 jets, per foot at intervals 10,535'/11,216'
Set packers & ran 3-1/2" tubing for completion.
Released rig 12:'00 Midnight 7-2-69.
FINAL REPORT
14 I hereby cel:~lfy j~l~t the foregomg m true .and
~~ //,~~/-_,~ Area Engineer 8-18-69
SIGNED '~fl TITLE .--- DATE
NOTE--Report on th,s forfn ~s reqmred for each calendar month, regardless of the status of operations, aflcl must be fded m duphcate
w~th the D~ws~on of Mmes & Mmerals by the 15th of the succeedmg month, unless otherwise d~rected
CO gE IAL
STATE OF ALASKA ~Seeothertn-[
, OIL AND GAS CONSERVA~ON ~ ....... ~e ~,de~l · ~x ~~ ~r .....
""'' , T ,~ , ,,' ~/~,;~ ~; ~ . ~7 ~ ~-~
WELL cOMPLETION OR RECOMPLETION REPORT AN
~. TYPE OF COMPL~ON: ~ --
NEW WORK
OVER [] PLU(. DIFF
E.~ D*¢K [--1 nEsva r-~ Other
~AME OF OPIRATOR
~obil 0il Corporation
ADDRgS~ OF OPERATOB ~
?. 0. Box 173~ Anchorage, Alaska ~¢501
4. LOCATIO,~ Or WELL (Report location clearly and in accordance with any State requirements)*
At surface
2391'S & 1379'E fr NW Cor., Sec. 13, TION, R12W, S.M.
At top prod. Interval reported below
Mobil-Union State #1 &
Granite Point State #18742
9. W~:i.T, NO.
~C # I-1
Z0. ~,~.n ~ ~m. OR w~~iddle
Granite Point Field-Kenai
~ ~., ~.. m., M., (~ ao~ '
o~~)
Lease L~ne 500~ ~esC of
2132'N & 3757'E from Surface Location (10,535'MD)
At total depth ~00~ NER12wCOrner,, S.M. Sec. 13 , TION,
~ 3080'N & 3135'E from surface location (15,715' T.M.D.) ~$b'~p 'x,. ~rr No.
,,~ ~ . , , . ~ : 69-9 .
,
18.~ T~ D~H, Mn & TVD pr. ~LUG ~dK ~D & ~. ~ ~'r~ ~., ' [ 21.
.5 715'~ 14.415'TVD[ ~'MD 10079TVD[ ~w~v. ! ,o~,,, Too~s . -
' ~ ' / ~.--ff' . [ - ~ ] Surface/TD --
~.~PRODUC~G ~'r~V~(S). O~ 'r~ ~M~'i'i~, ~M. Nl (D ~ '~v~), ~.'W~
· '~ ! ~ SURV~
Middle Kenaz Top. {0525 M.D. 9390 T.V.D.
Bottom~ !1216' M D 10060' T V D ] ~es
t DIL, Sonic, Dens[ty;iLL-3, Newtron, CBL , ' '
~ t e~n 811 strips set ~ wl
; 18 [ 70.~ ;[ B [ 437' [ 22" '[700 Sax,Cl, as~ G to aurfa~e -
~ _ .... / ~t J I I l:~ ~,~ ~side~raeked ,at 5fl28,' ~ -
, I I [,,,, Cq0 s.x,cz.s ' 1"
~. LIN~R ~CO~'~ ' i.q _ OK ;
~ S}~E' '~OP (D)'~ [ BOSOM (MD),SA~S ~., S~..~ (D)~Z. [ D~'S~ (~) [ PACK~ S~ (D)
~,4 Jet H/ft ~rall intervals m~z~;,z~(~,
10535/635 ~.i '1~840/~51 Total 315' Placed t00 sax pH plug w/bottom ~ 128941
: 10660/705 11050/9~5 1260 holes
Placed 225 sax ~H plug with bottom at
, 10735/785 11100/11145 11,4~8' &'~t~ of plug 'drilled off to 112~'
~ ~ ,j .... ;,,.,~r~ e ~1~ set ~t 11239'
~ I ,', BODUO~iON
DATE FIRST PRODUE~ON [ ~O~CTION, ~ . , ME'I'HO~ lFlow~., , , ~as hf~, p p~--~ ~ t~pe p~9) [WE~ ~TA~S (~oduc~ or
f 7 ~r P~oD ,p~BmU G~c~. WA~B~ lo,-Om ~O
! , t l i
24
~ [ , ~ [~-HO~ ~ i ' · "' ~- [O~ G~V~-~ '(C~ )
TEST WITNESSED BY
for fuel and fiared .'
USedoF
33 I hereby certify that the ~oregollg and ' ~
at~ahed~ lnfo~mation ~. complete and correct a~ ~etermined from alUavallable
, s ~E~~ -~ _ ~/~. ~I~E Area Engineer ~AT~ ~-9-6~ .....
· (See Instructions ~n~ S~ces [or A~ifionol Dote on Reverse Si~e)
INSTRUCTIONS
General: !This f0-rm is designed>fgr submitting: a fqmplete end correct ~elt. c0mpletion:repor~ ~nd~: log
all ~pe~ of ~an~ a~d I~ases;';.in Alaska.;
"'" ' ' ' ' : ' ~ ,not'otherwise; ' '
,~:;'-,~ I~icate.:Whic~elevation is used as reference (where shownLfor depth measure~
men~_gi~en in 9t~r s~ces;pn tbj~ form and,in any~ attochments.
~ms'2~ and ~:~;l~-th~s~well is co~eted~or :separate pr~ductidn from ~ore lhan~, o~ i0t~rval zone
(multiple c~le}ienL. ~:~te in item 20, ~nd 'in item 22 sh~w '}he p, cd~ing
to~;s), ~tt~(S)~'and"n~m~'(s) y-th& iot~rval }eported in item BP- S~b~aZ' ":';:~pa~atec re~}_~ "
(pa~) on t~ ~fO~,: ~ditional intei va[ :~o ~se~a~ly ~r~,~
~26: ';~ks '~} :;~tach~-~up~Ul ~ r~ds for this w~ll shouJ;d~ g~W"th~' d6tairs 6f'6h~
tiple sta~ ~enting and~ :i6~fi~f~'i~e ~nt~g t~l. -,
~m 28~-Subm~!,~',~rate}completio~ ':~e~r.t on: this form for eacE int~f~al to ~ ~eparately prOUd.
~ insf~UcfiOn fOr i~ms'.20 a"d22 ~e)? .... . '
~:~ ~ : -: ' - - - ;''~r ' ~ .: '~ . ~ ::WATER
;- ~ ~. 1-2;qts:. brackish water .... . , · ~
~. 127~;5!~i3;017~::; H;ml°C~k,;~; say congl. ~hd
,
Chronological Well History
Granite Point State MUC #I-1
- 2 - August 7, 1969
6-2 - 6-8
6-8 - 6-11
6-11 - 6-16
6-16 - 6-20
6-20 - 6-25
6-26
6-27 - 6-30
7-1 - 7-2
7 -2 -69
Drilled 8-1/2" hole 14,655'/14,945'. Cored 14,945'/14,971'
and recovered 26'.
Drill string parted leaving fish from 11,932'/14,890'.
Backed off fish at 14,070'. Jarred and recovered fish.
Drilled 8-1/2" hole 14,971'/15,058'. Ran electrical logs.
Drilled 8-1/2" hole 15,058'/15,416'.
Drill pipe parted at 1789'. Worked and recovered fish and
milled on junk.
Drilled 8-1/2" hole 15,416'/15,700'. Ran electrical logs.
Cored 15,700'/15,715', and recovered 15'. Ran electrical
logs.
Ran casing caliper in 9-5/8" casing.
Placed a 100 sax cement plug in the 8-1/2" hole with open
end drill pipe hanging at 12,894'. Placed a 125 sax plug
with drill pipe at 11,458'. Located top of cement at 11,269'.
Placed a 100 sax plug with drill pipe at 11,268'. Drilled
out hard cement to 12,242' and set a cast iron bridge plug
at 11,239' in the 9-5/8" casing. Hole below bridge plug
abandoned.
Perforated intervals between 10,535' and 11,216'. Set
permanent production packers in 9-5/8" casing at 10,470'
and 10,970'. Ran 3-1/2" tubing and placed well on production
by gas lift.
Released rig 11:59 PM 7-2-69.
CHRONOLOGICAL WELL HISTORY
GRANITE POINT STATE MUC #I-1
1-18-69
1-18 - 1-19
1-20- 2-3
2-4 - 2-15
2-16 - 2-18
2-19 - 2-20
2-21 - 2-27
2-28 - 4-5
4-6 - 4-7
4-8 - 4-12
4-13 - 4-15
4-16 - 5-1
5-2 - 5-4
5-4 - 5-6
5-7 - 5-13
5-14 - 5-31
6-1 - 6-2
Spudded
Drilled 12-1/4" hole to 450', opened to 22" and cemented
18" casing at 437' with 700 sax.
Drilled 12-1/4" hole 450'/6007'. Opened to 16" to 6007'
and to 17-1/2" to 1335'.
Cleaning out hole & fishing for drill string stuck at
2250' with top at 2044'. Recovered fish.
Ran and cemented 13-3/8" casing at 5973' with 750 sax
around shoe and with 2200 sax through DV collar at 1992'.
Cement returns to the surface.
Ran in to drill ahead and found 13-3/8" casing had parted
at the float collar at 5893'. Could not mill casing fish.
Milled window in the 13-3/8" casing from 5628' to 5674'.
Underreamed window to 17-1/2" and placed a 133 sax plug
containing 15 sax sand with drill pipe at 5674'. Ran in to
5674' ,could not locate cement. With DP at 5674' placed a
150 sax plug containing 20 sax sand. Waited on cement 71
hours and cleaned out hard cement to 5638'.
Sidetracked casing fish and drilled 12-1/4" hole from
5638' to 11,158'.
Stuck drill string at 9911'. Backed off at 9880'. Recovered
fish.
Ran electrical logs. Milled on junk and drilled 12-1/4"
hole from 11,158' to 11,298'.
Cemented 9-5/8" casing at 11,257' with 900 sax cement.
Drilled 8-1/2" hole from 11,298' to 12,955'. Ran electrical
logs. Drilled 8-1/2" hole to 12975'.
Cored from 12,975' to 13,017'. Recovered 38'.
Ran DST #1 on the interval 12,910'/13,017'.
Drilled 8-1/2" hole 13,017'/13,548'.
Ran electrical logs and drilled 8-1/2" hole 13,548'/14,641'.
Cored 14,641'/14,655'. Recovered 12'. Ran electrical logs.
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
PAGE NO. 2
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
11219' PBTD/ 15715' TD
1D 10/27/84
13 3/8" C. 5628'
9 5/8" C. 11257'
7" C. 11234'
95 PCF 91 SEC
DALLY COST: $ 69,046
ACC COST: $ 69,046
AFE AMT: $1,035,000
11219' PBTD/ 15715' TD
2 D 10/28/84
13 3/8" C. 5628'
9 5/8" C. 11257'
7" C. 11234'
94 PCF 75 SEC
SKID RIG #57 OVER MUCI #1. COMMENCE
OPERATIONS $ 0001HRS, 10/27/84.RU DA WL
& RIH W/ 1 11/16" SINKER BAR TO 10815'. POH.
RIH W/ FLOW METER TO 10120'. RU BO HUGHES &
ESTABLISH INOECTION OF 1.5 BBL/MIN, TAKING
FLOW OUT ANN. LOG UP W/ FLOWMETER-NO LEAK
EVIDENT. RD DA WL. ND TREE.
BOLTS & FLANGES ON TREE CORRODED. CUT BOLTS.
NU & TST BORE. RU & PULL ON TBG - NO
MOVEMENT. RU APRS.
DAILY COST: $ 37,348
ACC COST: $ 106,394
AFE ANT: $1,035,000
10665' TOF/ 15715' TD
3 D 10/29/84
9 5/8" C. 11257'
7" C. 11234'
93 PCF 47 SEC
RIH W/ FREEPOINT INDICATOR. FND TBG FREE
TO 9500' W/ 155,000# PULL. POH. RIH W/
2 19/32" TBG CUTTER & CUT TBG $ 9500'.
POH. RD APRS. POH-LD TBG. FND TBG HAD
PARTED $ +10665'. RIH W/ 6" BIT.
DAILY COST: $ 34,331
ACC COST: $ 140,725
AFE AMT: $1,035,000
i<ECEiVED
A:aska Off & Gas Cons, Anc horaoe
SHEET D
PAGE NO.
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
10665' TOF/ 15715' TD
4 D 10/30/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 43 SEC
RIH W/ 6" BIT TO TOP OF PKR $ 10118' DPM.
CIRC BTMS UP. POH. RIH W/ TSA PKR BURN-
OVER ASSY (BHA #2). BURN OVER PKR - TOOL
FAILED. POH.
DAILY COST: $ 31,741
ACC COST: $ 172,466
AFE AMT: $1,035,000
10665' TOF/ 15715' TD
5 D 10/31/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 43 SEC
DAILY COST: $ 29,109
ACC COST: $ 201,575
AFE AMT: $1,035,000
10665' TOF/ 15715' TD
6 D 11/01/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 43 SEC
DAILY COST: $ 52,163
ACC COST: $ 253,738
AFE AMT: $1,035,000
10665' TOF/ 15715' TD
7 D 11/02/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 44 SEC
RIH W/ TSA BURN-OVER ASSY (BHA #2A) & BURN-
OVER PKR ® 10118' DPM. PKR FELL FREE. POH.
RIH W/ TAPER TAP (BHA #3) & CHASE PKR TO
10,188'. RKR STUCK, TARRED INTO RKR.
DRAGGED PKR UR HOLE TO 9500' & TAR RELEASED.
RIH W/ 4 1/16" INSIDE GRAPPLE & CHASED RKR
TO 10188'. ENGAGE RKR & ROH. RECD RKR
& 12' SEAL BORE EXTENSION. RU DA WL.
RN 4 ARM CALIPER SURVEY F/ 10470' TO 10000'.
FND CSG COLLAPSED F/ 10185' TO 10192' & F/
10226' TO 10232'. MIN ID LESS THAN 5.70"
EACH SPOT. ROH. RD DA. RIH W/ 5.75"
SWDG & WORKED THRU BOTH TIGHT SPOTS. POH.
RIH W/ 5.875" SWDG. UNABLE TO WORK THRU
TOP TIGHT SPOT. ROH. ROH W/ 5.875" SWDG
12' EXTRA 4 3/4" DC (21 TOTAL DC).
WORK SWG $ 10197' FOR 1.5 HRS W/ NO PROGRESS.
POH. RIH W/ 5.8125" SWG (BHA #8) & WORK THRU
BOTH TIGHT SPOTS. POH. RIH W/ 5.875" SWG
(BHA #9).
DAILY COST: $ 30,379
ACC COST: $ 284,117
AFE AMT: $1,035,000
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
RAGE NO.
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
10665' TOF/ 15715' TD
8 D 11/03/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 44 SEC
DAILY COST: $ 30,279
ACC COST: $ 314,396
AFE AMT: $1,039,000
10665' TOF/ 15715' TD
9 D 11/04/84
9 5/8" C. 11257'
7" C. 11234'
95 PCF 52 SEC
WORKED 5.875" SWG THRU BOTH TIGHT SPOTS
(10197-10199' & 10238-10239'). POH. RIH W/
5.9375" SWG (BHA #10) & WORKED THRU BOTH
TIGHT SPOTS. OARS FAILED WHILE WORKING SWG
UP THRU TOP TIGHT SPOT (10198.5'). RU APRS &
BACKED OFF SWG ON 3RD TRY. RD APRS.
POH W/ BHA ~10. P/U NEW OIL OARS. RIH
& ROTATE INTO SWG ~ 10198.5'. SAPPED THRU
TIGHT SPOT. ROH. RIH W/ 6" SWG (BHA #11)
& WORKED ~ 10197' FOR 3 HRS W/ NO PROGRESS.
POH. RIH W/ 5.9375" SWG (BHA #12).
DAILY COST: $ 31,171
ACC COST: $ 345,567
AFE AMT: $1,035,000
10665' TOF/ 15715' TD
10 D 11/05/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 51 SEC
DAILY COST: $ 49,525
ACC COST: $ 395,092
AFE AMT: $1,035,000
WORKED 5.9375" SWG THRU TIGHT SPOTS F/
10197-10199' & F/ 10238-10239'. POH. RU
APRS & RUN DIA-LOG 64 ARM CSG INSP LOG.
THRU BAD SPOTS. OD OF MILL FND TO BE
RD APRS. LOG SHOWED BOTH COLLAPSED
SECTIONS TO BE AT CSG COLLARS. REMAINING
WALL THICKNESS ~ 10198'. = +1/16". RIH W/
5 3/4" PKR MILL ASSY. COULD NOT WORK THRU
TOP TIGHT SPOT. POH.
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
PAGE NO.
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
'DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
10665' TOF/ 15715' TD
11 D 11/06/84
9 5/8" C. 11257'
7" C. 11234'
95 PCF 49 SEC
DAILY COST: $ 32,182
ACC COST: $ 427,274
AFE AMT: $1,035,000
RIH W/ 6" TAPERED MILL & 5 13/16" STABILIZER
(BHA #14). MILLED F/ 10194-10199' & F/
10235-10240'. CIRC BTMS UR. POH (NO DRAG
THRU BAD SPOTS). OD OF MILL FND TO BE
5 15/16". RIH W/ RRT (BHA #15) & TAG PKR
$ 10475'. BURNED OVER RKR F/ 10475-10477'.
RKR FELL FREE. ROH. REC RKR. RIH W/ 5 3/4"
SHOE & 364' OF WASHRIRE.
10665' TOF/ 15715' TD
12 D 11/07/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 46 SEC
DAILY COST: $ 31,635
ACC COST: $ 458,909
AFE AMT: $1,035,000
10665' TOF/ 15715' TD
13 D 11/08/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 49 SEC
DAILY COST: $ 47,849
ACC COST: $ 506,758
AFE AMT: $1,035,000
WASHPIPE TAGGED UP $ 10522'. WORKED TO 10535'
-UNABLE TO WORK DEEPER. POH. RIH W/ 6"
TAPERED MILL (BHA #17) & MILLED F/ 10535'-
10541'. ROH. MILL HAD MARKS F/ 4" OD TO 6"
OD. RIH W/ 5 1/4" SWG (BHA #18). WORKED SWG
THRU TIGHT SPOT $ 10541' W/ 15000# DRAG. RIH
& TAG TOF $ 10665' DRM. CIRC BTMS UR. ROH. RU
ARRS & DIA-LOG FOR MIN ID CALIPER.
RIH W/ DIA-LOG MIN ID CALIPER. TOOL STOPPED
8 10568'. POH. FND SNK IN CALIPER ARMS.
RIH W/ CALIPER & LOGGED F/ 10630-9500'. FND
MIN ID TO BE 5.375" (BAD CSG F/ 10530'-
10600'). RIH W/ 5 3/4" SWG (BHA #lB) & WORK
TO TOF ~ 10665'. CIRC BTMS UP. POH. RIH W/
5 15/16" SWG (BHA #20) & WORK TO 10660'. CIRC
BTMS UP. POH.
10665' TOF/ 15715' TD
14 D 11/09/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 48 SEC
DAILY COST: $ 31,153
CUM COST: $ 537,911
AFE AMT: $1,035,000
RIH W/ 5 3/4" WASHPIPE (BHA #21) & WORK TO
TOF $ 10665'. WASHOVER FISH F/ 10665-10672'.
UNABLE TO GO DEEPER. POH. SEVERE WEAR ON
MILL SHOE. RIH W/ 67' OF 5" WASHPIPE & 5 1/2"
SHOE (BHA #22) & WASHOVER FISH F/ 10672'-
10723'. POH.
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
PAGE NO.
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
10812' TOF/ 15715' TD
15 D 11/10/84
9 5/8" C. 11257'
7" C. 11234'
94 PCF 47 SEC
RIH W/ 189' OF 5" WASHPIPE & 5 1/2" SHOE (BHA
#23). WASHOVER FISH TO 10840'. POH. RECOVERED
147' OF 3 1/2" TBG FISH IN WASHRIRE. RIH W/
BHA #23 & WASHOVER FISH F/ 10812' TO TOP OF
RKR ~ 10980' DRM. CIRC BTMS UR. ROH.
DAILY COST: $ 35,817
CUM COST: $ 573,728
AFE AMT: $1,035,000
11219' PBTD/ 15715' TD
16 D 11/11/84
9 5/8" C. 11257'
7" C. 11234'
96 PCF 45 SEC
DAILY COST: $ 32,810
CUM COST: $ 606,538
AFE AMT: $1,035,000
11219' PBTD/ 15715' TO
17 D 11/12/84
9 5/8" C. 11257'
7" C. 11234'
96 PCF 49 SEC
CONT POH W/ BHA #23. RECD 119' OF 3 1/2" TBG
FISH IN WASHPIPE. RIH W/ ROLLING DOG OVERSHOT
ON 5" WASHPIPE. WASHOVER FISH TO 10980'. POH
RECD REMAINING 72' OF TBG FISH. RIH W/ 10 STS
OF 2 3/8" TBG ON 3 1/2" DP. CIRC DN TO 11071'-
COULD NOT GO DEEPER. CIRC BTMS UP. POH.
RIH W/ 5 15/16" SWG (BHA #12 PR). WORKED TO
PKR 8 10980' DPM (TIGHT SPOTS 8 10531' & F/
10756-10980'). POH. RIH W/ PKR BURN-OVER
ASSY (BHA #13 PR). BURNED-OVER PKR. POH. RECD
PKR. RIH W/ HOWCO 7" RTTS.
DAILY COST: $ 34,999
CUM COST: $ 641,537
AFE AMT: $1,035,000
11219' PBTD/ 15715' TD
18D 11/13/84
9 5/8" C. 11257'
7" C. 11234'
95 PCF 42 SEC
DAILY COST: $ 37,883
CUM COST: $ 679,420
AFE AMT: $1,035,000
SET RTTS ® 9985. TST ANN TO 1500 PSI - OK.
RELEASED RTTS. POH. RIH W/ 5 7/8" BIT (BHA
#26). CO FILL F/ 11,015 - 11,055. COULD
NOT WORK DEEPER. POH. RIH 5 1/4" SWG.
WORKED SWG F/ 11,055 - 11,072'. COULD NOT GO
DEEPER POH.
kECEiVED
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
PAGE NO.
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
11219' PBTD/ 15715' TD
19D 11/14/84
9 5/8" C. 11257'
7" C. 11234'
96 RCF 46 SEC
DAILY COST: $ 31,372
CUM COST: $ 710,792
AFE AMT: $1,035,000
11219' PBTD/ 15715' TD
20D 11/15/84
9 5/8" C. 11257'
7" C. 11234'
95 PCF 41 SEC
RIH W/ 5 1/2" FLAT BTM MILL (BHA #28). MILLED
THRU TIGHT SPOT F/ 11,068 - 11,075'. RIH TO
RBTD @ 11,226'. CIRC BTMS UR. CLOSED HYDRIL
& RUT 1500 PSI ON ANN - 7" X 9 5/8" ANN
CLIMBED F/ 375 PSI TO 640 PSI IN 20 MINUTES.
BLED OFF PRES. POH. RIH W/ 5 7/8" FLAT BTM
MILL (BHA #29). COULDN'T WORK BELOW 11,059'.
ROH.
RIH W/ 5 3/4" SWG (BHA # 30). WORKED TO PBTD
11,223' DPM. POH. RIH W/ 5 15/16" SWG (BHA
31). WORKED THRU TIGHT SPOTS 8 ll,070 AND
11,152', TAG RBTD ~ 11,223'. CIRC BTMS UR.
ROH. RIH W/ HOWCO MODEL N RBR.
DAILY COST: $ 31,384
CUM COST: $ 742,176
AFE AMT: $1,035,000
11219' PBTD/ 15715' TD
21D 11/16/84
9 5/8" C. 11257'
7" C. 11234'
92 PCF 38 SEC
DAILY COST: $ 39,299
CUM COST: $ 781,475
AFE AMT: $1,035,000
11222' DPM/ 15715' TD
22 D 11/17/84
9 5/8" C. 11257'
7" C. 11234'
90 PCF 36 SEC
DAILY COST: $ 72,158
CUM COST: $ 853,633
AFE AMT: $1,035,000
SET RBP ~ 10,181' DPM. PRES TST TO 1500 PSI -
OK. SPOT 15 SXS OF 12-20 SD ON TOP OF RBP.
WASH DOWN TO 10,140' & REV OUT. POH. RU GO.
RIH & PERF F/ 10,131' TO 10,133' ~ 4 SPF. POH.
RD GO. RIH W/ RTTS & SET ~ 9898' DPM. RU BO &
TEST LINES TO 8000 PSI - OK. ATTEMPT TO
BREAKDOWN PERFS W/ 6500 PSI- NO BREAKDOWN, NO
PRES INCREASE IN 7" X 9 5/8" ANN. BLED OFF
PRES. POH. RIH W/ RBP RETRIEVING TOOL.
WASHED DOWN & LATCHED ONTO RBP ~ 10,181'. POH.
RIH W/ 5 15/16" SWG. WORKED THRU TIGHT SPOTS
~ 10,655', ll,051' & 11,073' & TAG PBTD ®
11,222' DRM. CIRC 2 FULL CIRCULATIONS. ROH.
RU & RN 5" LINER W/ FS ON BTM, FC i SNT UP -
TOTAL LENGTH 1129.52'. RN CSG TO BTM & CIRC
RIPE VOLUME. BACK RUNNING TOOL OUT OF HGR. RU
BO & TEST LINES TO 5000 PSI.
,,ECEJVED
D;: c 0 1985
A!aska Oil & Gas Cons. Commission
Anchorag~
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
PAGE NO.
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STAT~ MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
11222' DPM/ 15715' TD
23 D 11/18/84
9 5/8" C. 11257'
7" C. 11234'
5" 10,092 - 11,222'
90 PCF 35 SEC
DAILY COST: $ 25,026
CUM COST: $ 878,659
AFE AMT: $1,035,000
11220' ETD/ 15715' TD
24 D 11/19/84
9 5/8" C. 11257'
7" C. 11234'
90 PCF 35 SEC
DAILY COST: $ 27,847
CUM COST: $ 906,506
AFE AMT: $1,035,000
10,095 TOF/ 15715' TD
25 D 11/20/84
9 5/8" C. 11257'
5" L. 10,092 - 11,222'
7" C. 11234'
90 PCF 35 SEC
DAILY COST: $ 24,998
CUM COST: $ 931,504
AFE AMT: $1,035,000
11,219 ETD/ 15715' TD
26 D 11/21/84
9 5/8" C. 11257'
7" C. 11234'
5" L. 10,092 - 11,222'
95 PCF 47 SEC
DAILY COST: $ 31,885
CUM COST: $ 963,389
AFE AMT: $1,035,000
CMTD 5" LINER W/ 127 SXS CL 'G' CMT W/
ADDITIVES. DISP W/512 CF OF MUD. BUMPED PLUG
W/ 2000 PSI. CIP ~ 0100 HRS, 11/18/84. POH.
RIH W/ 6" BIT & 7" CSG SCRPR. WOC UNTIL NOON.
TAG CMT $ 9653'. DRLD STRINGERS & SOFT CMT TO
9750'. DRLD HARD CMT TO TOL $ 10,092'. CIRC
BTMS UP. RIH W/ HOWCO RTTS & HYDRASPRING. SET
RTTS ® 10,055' & OPENED HYDRASPRING. WAIT
30 MINUTES. CLOSE HYDRASPRING. POH.
CONT POH W/ TST TOOLS. FND i STAND WET -
INDICATES LINER LAP GOOD. RIH W/ 4 1/8" BIT &
CO CMT 8 LINER TOP F/ 10,096' TO lO,lO5'. RIH
& DRLD CMT F/ 11,194' TO LC 8 11,206'. RIH &
DRLD CMT F/ 11,210' TO 11,220'. CIRC BTMS UP.
POH. RIH W/ 5" CSG SCRPR TO PBTD 8 11,220'.
CIRC BTMS UP. POH. RU GO WL. RIH W/ OB & 4.15"
GAUGE RING TO 10,287' (HAD DIFFICULTY GETTING
THRU HGR ASSY). POH.
RIH W/ GR - CCL & LOG TO BTM. POH. GR OF GOOD
DEFINITION & ABLE TO COORELATE W/ OPEN HOLE
LOGS. RIH W/ lC' 3 3/8" PERF GUN. COULD NOT
WORK BELOW 11,168' (GR DEPTH) - BTM ZONE F/
11,192' TO 11,222'. POH. RIH W/ OB & 2 SINKER
BARS. COULD NOT GET BELOW 11,168'. POH. RIH
W/ 4 1/8" BIT & 5" CSG SPRPR. RN TO BTM W/NO
DRAG. POH - FND 4 1/8" BIT MISSING. RIH W/20'
PERF GUN - COULD NOT GET BELOW 10,095' WLM-BIT
STUCK IN LINER HGR. POH. RIH W/ 4" FISHING
MAGNET & 2 SINKERS BARS. MAGNET STOPPED ®
9600'. POH. RIH W/MAGNET & 3 SINKER BARS.
WORKED MAGNET ON LINER TOP.
WORKED MAGNET ~ 10,098' WLM. POH-NO RECOVERY.
RIH W/ 3 3/8" PERF GUN & TAG BIT ~ 10,103' WLM
- CCL INDICATES BIT IN LINER HGR. POH. RIH W/
3 1/2" DP, W/ BOTTOM SNT PIN CUT OFF & WORK
BIT THRU HGR. POH. RIH W/ 5" SCRPR (BHA #36)
& PUSH BIT TO BTM ~ 11,216' CIRC & COND MUD.
RECEIVED
A!aska Oil & Gas Cons. Oomm~s~,or~
Anchorage
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
RAGE NO.
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
11,216 ETD/ 15715' TD
27 D 11/22/84
9 5/8" C. 11257'
7" C. 11234'
5" L. 10,092 - 11,222'
82 RCF 37 SEC
DAILY COST: $ 32,815
CUM COST: $ 996,204
AFE AMT: $1,035,000
11,216 ETD/ 15715' TD
28 D 11/23/84
9 5/8" C. 11257'
7" C. 11234'
5" L. 10,092 - 11,222'
95 PCF 39 SEC
DAILY COST: $ 32,768
CUM COST: $1,028,972
AFE AMT: $1,035,000
11,216 ETD/ 15715' TD
29 D 11/24/84
9 5/8" C. 11257'
7" C. 11234'
5" L. 10,092 - 11,222'
89 RCF 38 SEC
DAILY COST: $ 38,347
CUM COST: $1,067,319
AFE AMT: $1,035,000
11,216 ETD/ 15715' TD
30 D 11/25/84
9 5/8" C. 11257'
7" C. 11234'
5" L. 10,092 - 11,222'
98 PCF 33 SEC
DAILY COST: $ 128,630
CUM COST: $1,195,949
AFE AMT: $1,035,000
ATTEMPTED TO SCREW INTO LOST 4 1/8" BIT. POH-
NO RECOVERY. RU GO WL. PERF F/ 11,186' TO
11,212' & F/ 11,125 TO 11,145' DIL G 4 SRF.
RIH W/ 4 1/8" BIT & 5" CSG SCRRR TO CO RERF
DEBRIS.
CIRC G 11,216' DPM. POH. RU GO WL. RIH W/ 25'
3 3/8" PERF GUN - COULD NOT GET BELOW 11,050'.
POH. PERF F/ii,il0' TO 11,121', F/ll,050 TO
11,075', F/10,841' TO 10,851', F/10,815' TO
10,825', F/10,735' TO 10785', F/10,660' TO
10,705' 8 4 SPF.
PERF F/10,535' TO 10,635'. RD GO WL. RIH W/
5" CSG SCRPR TO 11,216'. CIRC & COND MUD. SI
& DP PRES BUILT TO 300 PSI IN 45 MINUTES.
BUILT MUD WT TO 93 PCF. SI & DP PRES BUILT TO
1020 PSI (107 PCF EMW).
CIRC & BUILT MUD WT. POH. RU GO WL. RIH
W/ OTIS 5" WB PROD PKR & SET 8 10158' WLM.
POH. RD GO. RIH W/ SEAL ASSY & LOCATOR.
STABBED INTO PKR 8 10151' DPM & TST PKR -
OK. CIRC & COND MUD. POH & LD DP.
Aritho' age
UNION OIL COMPANY OF CALIFORNIA
WELL RECORD
SHEET D
PAGE NO. 10
LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT
DATE ETD
DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS
11,216 ETD/ 15715' TD
31 D 11/26/84
9 5/8" C. 11257'
7" C. 11234'
5" L. 10,092 - 11,222'
98 RCF 33 SEC
DAILY COST: $ 187,956
CUM COST: $1,035,000
AFE AMT: $1,035,000
11,216 ETD/ 15715' TD
32 D 11/27/84
7" C. 11234'
5" L. 10,092 - 11,222'
DAILY COST: $ 38,878
CUM COST: $1,422,783
AFE AMT: $1,035,000
RU & RN 314 STS 3 1/2" 9.2# N-80 BUTT TBG
W/ 18' OTIS SEAL ASSY (TOTAL LENGTH
10,130.07'). LANDED TBG IN HGR. TST TBG
TO 1200 PSI - OK. INSTALL BRV. ND BORE,
NU & TST WELLHEAD.
RU MYERS WL. RIH & REMOVE BPV. 1020 PSI
ON TBG, 0 PSI ON ANNULUS. MIXED PKR
FLUID (1 GAL NALCO 3656 & 10 GAL NALCO
933 PER 350 BBL H20). RIH & OPENED
X-A SLEEVE. PUMPED 50 BBLS H20 & 500
BBLS PKR FLUID DN ANNULUS. RIH & CLOSE
X-A SLEEVE. RD MYERS. FLOWED WELL TO MUD
TANKS ~ 4 BBLS/ HR. RELEASED RIG @ 2400
HRS, 11/27/84.
Form D-lOO1-A
UNION OIL CO. OF CALIFORNIA
REPAIR RECORD
SHEET A
Page No. i
LEASE Union-Mobile State #1 WELL NO. MUC I-1 CONTRACTOR Conservative Drilling
FIELD Granite Point LEASE # ADL-18761 TYPE UNIT Wilson 120 H
BEGAN 10/27/84 COMPLETED 11/27/84 ELEVATIONS: GROUND
PERMIT NO. _~69-9 SERIAL NO. 50-733-20173 CASING HEAD
COMPANY E~I~ER Te~ ian_ _ _ TUBING HEAD
APPROVE~~Z~_~,__~. ~ ~.,~'_~,"~_~_.~?_..,~_.,,~ ROTARY DRIVE BUSHING 106' MLLW
CASING & TUBING RECORD
SIZE DEPTH WEIGHT GRADE REMARKS
13 3/8" 5973' 61# 0-55 Butt Window $ 5628'
,, 5/8" l125Y' 40#, 43.5#, 4Y# N-80, N-80, S-95 Butt
11234' 23#, 26#, 29# N-80 Butt, Butt, X-Line
5" 11222' 18# N-80 Butt & ABFL4S
3 1/2" 10218' 9.2# N-80 Butt
Cmtd w/ 250 sx "G" cmt
Liner Hanger $10092'
Cmtd w/ 127 sx "G"
(see detail)
Otis 5" WB Pkr ® 10151'
PERFORATING RECORD
DATE INTERVAL E.T.D. REASON PRESENT CONDITION
11/16/84
11/22/84
11/22/84
11/23/84
11/23/84
11/23/84
11/23/84
11/23/84
11/23/85
11/24/85
11186-11216'
11100-11145'
11050-11075'
10841-10851'
10815-10825'
10735-10785'
10660-10705'
10535-10635'
lO131-10133'
11186-1i212'
11125-11145'
llllO-11121'
11050-11075'
10841-10851'
10815-10825'
10735-10785'
10880-10705'
10535-10635'
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
Isolation Sqz-no breakdn
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
For Injection
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Cemented behind 5" liner
Open
Open
Open
Open
Open
Open
Open
Open
Open
INITIAL PRODUCTION AFTER REPAIR
DATE INTERVAL NET OIL CUT GRAV. C.P. T.R. CHOKE MCF GOR REMARKS
Injection Well
WELL HISTORY PRIOR TO REPAIR
COMPLETION DATE: 2400 HRS~ 11/27/85
PRODUCING INTERVAL:
LAST COMPLETION NO.
INITIAL PRODUCTION: Injector
LAST REGULAR PROD. & DATE:
CUMULATIVE PRODUCTION:
REASON FOR REPAIR: To repair a tubing leak and restore injection
RECEIVED
.,
D 0''
~laska Od & Gas Cons. Commission
Anc~mrage
iH~ITUhl FIll
I_i.~A']F: ~ll,lr,.FllI-Nl]i..'.ll .%1-{'~'I'I.-: 'HI I,:4EI I I'lr).; IILI~'; I 1 I: I1:1 .I.):
1'" "/8" CAS1NG t'~l_ 1"AIl
,] T'.:,. L)ESC[,.' L I" r 1 L'~i"I LiD X 1 L,'.
.. 6 J..}-] ,t _,..-r--,.~,.. [{Ij F It d_SS
_. N] NE)OW CLII A F L'-';;.'~2LI'
I F I',.1(~111
I)F..:F",I,I I I I-:' I '~ ) ri'IT
I-:() t ] (ll,I I F.)I-'
I i/~ Itl
· ,, ;~
I_I_-'.I,IG I'II I-;O-F Ir)Il 1 I_ll'
49._.5'"_, ,, F)()"1- 9 ~" . O, ~ (.~11r<l ~' , CI:
-,' ~, r'] 9 ~, J
c)'2~.':.)~) ] l'2'J/.Or) /
L I"I',H] Iii L':L]I Ii iii F(.)I'
6,",9 3.0()
'J '1V ".(")(.) 9:1 <-I<'.:' . ( )( ~ 66V'."; (.)0
?",":,'18.0,.:, I I ,"3/I ,,
, l ] S.
L]" i_]lql(l( ~)l'[,"ill
Ill') / J i)
I 1-1:.1(]111 l~l.II II Ill I I]l'
I I ",u,, (")~) I I 2..' ',, (~) l()(,'?,',
,.ECEiVED
o u l g'5
~Jaska O~l & Gas Cons. ¢omm. issior]
Anchorag9
LINI~31q 1311.
~,1 II I I
I 'Cfi;l. I:.lf},,
I.I-F~-;E:: tJhltFtl',l-I',ILJ;Z, rl c;Ir'..'~rl£ ff:l I,;iLLI 1. I,Ii'~, :: hltJ[' ] -1. I IE-.I.D:: I;l(f~tll IL
I"'iJ1 bi I
~J fF;.
1:,I2~ ,t ,I ,: .I I ' I i ~
H/I lelfF-I,I I-[~'/ r;tll DF:
,'; '5/~;" r~.LI1 l
X I',.lil'l'l fZ
," 3/fl" I;IITI' F'tII'
xf] ; : I /.,'" f-{!J FT- ,.'
', J/2" Idll t" I'~
Xt] (t-,I"{~L ]'.:t Jl'(l-_ --'
~.;t.¢~l uOl,1 tZ;:,; Fl-iqL,.[!]l,i
t;t 11',lh. ll- t' I LH ,'
'i" r}ll% !,,ll'i I'-'E"I"~'I',I F'I I';'
(JI;, X Il)
¥...,'t I i I~
Alaska Oil & Gas Cons. Commission
Apchorag.J
i i i
W£LL GP$ MU(: I-1
CASING & ABANDONMENT DETAIL'
L) Kelly Bushing at 0.00'
! II.) OCT Tubing Hanger at 38.00'
,
: I. LL) 13 318', 61~, J-55 Casing &t 5973' with
Window at 5628'
uJ: I ;
iV.)~~.,, tSP, N-80 Liner ;~t 1Q092"
V.)~!8~, N-~O Liner at 11222*
Vl.~)~7~': 2~3~,26~,&29~' 1~-SQ Casing ;It ? 1234'
i VII.) 9 518°: 40~,43.5~&47~- N-80&8-95
!
~ Casing at 11257'
!' TUBING DETAIL
! 3 1/2; 9.2~, N-80 TUBING
& 2 3/8", 4.7~, N-80 TUBING
with AB Modified Couplings
! 1.) Otis 'WB' Perm. Packer at 10151'
I 2.) Seal Bore Extension at 10160'
3.) Bottom of Mule Shoe at 10176.47'
~ !
4.) 3 112' x 2 3/8' Crossover at 10178.18°
; I 5.) Otis 'X' Nipple at 10191.54"
i i [ 6.} Wireline Re-entry Guide at 1:0224.01
I PERFORATION RECORD
DA TE INTERVAL CONDITION'
: 111818,5 1'1'186'-11212" Open C Zone Injection
i 11110'-11121'
i 3 11050'-11075'
4
5 ! 10841'-10851' Open B Zone Injection
6
B ZONE , lO~5'-~os25'
10735'-10785'
·
C ZONE 10660'-10705'
V 10535'-10635'
Note: All perfs 4HPF, DIL Depths
·
VII __~ __
12," C 0 ~,
Anch0r~J3
REV. ~ DATE
_ DRAWH BHE C~<O. ~
APP'D. NONE
WELL GPS MUC I-1
WELL SCHEMATIC
iii i i i i
UNION OIL COMPANY OF CALIFORNIA
ANCHORAGE, ALASK& SHEETS I SHEET
FORM V 247 A 5/56 750
MUC- I
13
I!,
12
II
I0
2'-
8
4
$
!
f 1
I 1
.11
2
Wellhead Equipment Division
Houston
PARTS LIST
3" Completion
Muc- 1
TREE NO.
ITEM PART NO.
10
11
12-130-040
90-010-220
26-190-087
13-300-240
14-010-617
90-010-620
14-630-*
26-190-060
82-020-462
02-042-904
90-030-831
722
SIZE
WORKING
PRESSURE
DESCRIPTION
Casing head 26" OD buttweld x 24¼" 1000
WP calmp hub
Valve, FE, FMC Model 20 2" 2000 WP Trim
R
Clamp, OCT 2 bolt 24¼" 1000 WP
Casing head, 24¼" 1000 WP clamp hub
bottom x 20¼" 2000 WP W/2 2" 2000 std
outs
Unihead, UH, type II 13-3/8" OD buttress
x 13-5/8" 5000 WP clamp hub, W/w w" LPO
Lower section, W/2 2" 5000 std outs
upper section
Valve, FE, FMC Model 20 2" 5000 WP, trim
R
Tubing head, U-00, 7" OD, 13-5/8" 5000 W!
clamp hub btm x 7-1/16" 5000 WP W/ 2 2"
5000 WP std outs
Clamp, OCT 4-bolt 13-5/8" 5000 WP clamp
with studs & nuts
Tubing hanger, U-30, 6"x 3.5"OD buttress
top & bottom, W/IS BPV groove, W/DHCV
port
Adapter, A-4, 7-1/16" 5000 WP x 3-1/16"
10,000 WP bored for E.N. hanger
Valve, F.E. FMC, Model 30, 3-1/16"10,000
WP, Trim S
UNIT PRICE
TOTAL PRICE
Page 2
Wellhead Equipment Division
Houston
PARTS LIST
3" Completion
Muc- 1
TREE NO.
ITEM
12
13
PART NO.
25-021-419
02-240-078
722
SIZE
QUAN.
WORKING
PRESSURE
DESCRIPTION UNIT PRICE TOTAL PRICE
Cross, C-600, 3-1/16" 10,000 WP x 3-1/16
10,000 WP
Adapter, B-11-AO, 3-1/16" 10,000 WP W/
3% EUE 8rd lift thd
RECEiVF
D~C 0~
Nasl~ Oil & Gas
-----.~ ~ Anchorafi9
SUBSEQUENT REPORT OF REPAIRING WELL
MUC I-1
January 21, 1971
12/29/70 - 1/7/71 Located leak at 5961'. Squeezed leak with 145 sax
Class G cement. Maxirnurnpressure 3500 psi. WOC 21 hours. Tested
squeeze job and had breakdown at 1750 psi. Resqueezed leak at 5961'
with 191 sax Class G cement. Maximum pressure 5000 psi. WOC 27 1/2
hours. Located top of cement @ 5837' and tested casing 5837' to
surface with 3000 psi, OK. Drilled out cement and tested. Squeeze broke
down at 3000 psi. Resqueezed with 165 sax class G cement with 1% CFR-2.
Final pressure 5000 psi. WOC 36 hours. Drilled out cement and tested.
Squeeze broke down at 3150 psi. Resqueezed leak with 200'sax Class G
cement. First 100 sax containing .3% Nalad 9 and last 100 sax w/6#salt
and 6# frac sand per sack of cement. Final pressure 4750 psi. Drilled
out cement and tested squeeze job to 3000 psi, OK.
1/8-10/71 Circulated sand off bridge plug and recovered bridge plug at
6335'. Drilled out cement 6425/6535. Set seal assembly in packer at
10,470' and tested casing from 10,470' to the surface with 3000 psi, OK.
Ran tubing and cleaned out to 11,236'. Washed all perforations with
2000 psi.
1/11-12/71 Ran 352 joints 3 1/2" 9.2# buttress tubing and landed with 18'
of seals in packer at 10,470' and 23' of seals in packer at 10, 970'. Bottom
of tubing at 11,002'. Otis X-O sleeves at 10,960', 10,523' and 10,468'.
Displaced salt water in annulus with 660 bbls inhibited sodium bichromate
water 8.5#/gal, ll+pH. Landed tubing with 15,000# on the top packer.
Tested annulus with 3000 psi, OK. Instal[ed Xmas tree. Released rig
@ 12 midnite 1/12/71 and commenced water injection.
DIVISION OF OIL AND GAS
ANCHORAGI~
DI ECTIiOi AL SURVEY
FOR
MOBIL OIL CORPORATION
E PORT
SP-135C
~YPE OF SURVEY' Surwel Gyroscopic Multishot
%6oo
SURVEY DEPTH: FROM , FT. TO
LEASE~ Granite Point ~JC
FIELD: ,,~ ~O,ranite Point
11,150
1
WELL NO.
COUNTY/PARISH, Kenai
DATE OF SURVEY ~pril 13~ 1969
OFFICE: Anchorage, Alaska
JOB NO,
Alaska
STATE
SU-3-16439
:MOBIL OIL CORPORATION PAGE 1 '
......... · 'GRANITE POINT STATE MUC-I .................................................... 4-13-69 .................. SURVEY DATE -- ..........
·
'GRANITE POINT VERTICAL SECTION COMPUTED ALONG CLOSURE
ALASKA
SPERRY-SUN_WELL_SURVEYING COMPANY
SU-3-16439
RECORD.. OF. SURVEY
......... TRUE ...... INCLINATION
MEASURED VERTICAL SEVERITY VERTICAL
DEPTH ..... DEPTH ...... DEG MIN ........ DEC . __ DEC/lO0 ._ SECTION ....
...DIRECTION .... DOG-LEG ......................... RECTANGULAR COORDINATES
...... .750
769
..... 784
· 5600 ...... 4989.02 ........... TAKEN..FROM.~SU-3~16425
5700. 5082.22 21 I5 N 60 E 0.00 2271.07
......... 5800 ..... 5175.57 ........ 21_ 0 .... N 65 E ........ 1.81
RTH __ SOUTH EAST _ _ WEST .....
· 98 ........ 2154.31.
· IO 2185.69
· 24 ....... 2218.I7 ..............
5900 ....5267.79
6000. 5360.67
6100. __, 5454.49,
6200._
6300.
6400.
6500
6600
6700
6800,
6900.
7000,
22. 45 ...........N_68 E ..... 2.07 .... 2344,93___ 798,73
21 45 N 67 E 1.06 2381.64 813.21
20~_15 ......... N.63._E ............2.07 ........ 2416.18 ..... 828.92
__5551.20 .............. 14_~45 ....... N_49_E ........ 6.88___2441.24 ....... 845.62
5647.08 16 30 N 43 E 2.37 2468.51 866.40
5742.19 ......... 18~_ 0 ...... N_44.E ......... 1.52 .... 2498.34 ....... 888.62
5836,30 ........... 19_45 .........
5929.50 21 15
6021.89 ....... 22 .... 30
N 46..E ........... 1.86 .... 2531.24 ...... 912.10
N 49 E 1.83 2566.9I 935.88
_N_48_E ............ 1.30 ......2604.45 ...... 961o48
6113.25 ...... 2~_ 0 N 49_E ......
6203.51 25 30 N 48 E
6293.1~ .......... 26_,15 ......... N,,48_,E ........
1.55 ...... 2644.49_
1.55 2686.72
0.74 ..... 2730.1 ] .......
..... 988
1016
1046
2254.03 .............
2288.14
2318.98__
2338.19_
2357.56
2379.03 .................
2403.34
2430.69
2459.13 ....
· 17 ............. 2489.82
· 97 2521.82
· SZ.._ 2554.69
7100
7200.
7300 .....
7400
7500.
· _ .__
~'"'"7800:
7900.
6381.28 28_15
6468.95 28 45
6556.63 ...... 28_45
N~50.._E ......... 2.19 ..... 2776.84 ........ 1076.99
N 50 E 0.49 2824.32 1107.91
N.51_ E .......... 0.48 ..... 2871.93 ..... 1138.18
6644.09 ............. 29 ..0 ..........N 52 E ....... 0.54 ..... 2920.03 ....... 1168.03
6730.91 29 45 N 53 E 0.89 2969.36 1197.89
6817.07 ........ 30 ~0 ............. N_SZ_E ....... 0.90 ...... 3019.72 ......... 1229._14
2590.94
2627.79
2665.17
2703,37
2743.00
2783.00
_.6901.41 _.32 .... 30 ..........N 52_E ............2.00 ...... 3073.03____ 1262.22
6984.07 34 15 N 53 E 1.83 3128.98 1296.09
._7067.94 ........... 33_ 0 ...... N 52. E ......... 1.36 ......3183.02 ...... 1329.62 ........
_2825.34 ....
2870.29
..... 2913.20 ...................
RAN~TE POINT._.STATE_MUC__I
RAN!TE PO!NT
LASKA __ _
PAGE 2
.......... 4~13-69 ................ SURVEY DATE '.
VERTICAL SECTION COMPUTED ALONG CLOSURE
SPERRY_-SUN_WELL_ SURVEYING_COMPANY ....................... SU- 3-_16439_
.................... RECORO_.OE. SURVEY
...... TR
ASURED VERT
DEPTH ...... DE
8000 ..... 7153
8100. 7238
8200 ....... g323
UE ....... I NCL I NA.T ION __O I REC_T I ON .... DOG-LEG ....
ICAL SEVERITY
PTH ......... DEG.MIN ....... DEG __ _DEG/100_._
VERTICAL
RECTANGULAR COORDINATES
..... NORTH .... SOUTH__ EAST __ WE_ST___
· 20 ........... 31.30
.69 31 15
· 73 ........... 31_A5
.SEC!_I ON.
N_Si.E ....... 1.59 _.3234.74 ...... 1362.50 ........... 2953.81
N 50 E 0.57 3285.95 1395.85 2993.55
N~49__E ......... 0,72__ __3337,.74 ..... 1430,37 ......... 3033.26
8300. _7407.83 ............... 32. 45 N_50_.E ........
8400. 7490.49 34 15 N 50 E
8500 ...... 7573.15 ....... 34__15 ....... N_49_.E ........
1.13 3391 · 15 ..... 1465.14 3074.70
1.50 3446.71 1501.32 311f.82 ~
O. 56 .... 3502.10 .... 1538.24__ 3160.29~
8600 ....... 7655.06
8700. 7736.22
8800. 7818.39
35__0 N_49 E
35 45 N 48 E
34 45 N 48 E
0.74 .... 3558.56 ..... 1575.87 ........
0.94 3615.87 1614.97
0.99 3671.79 1653.11
.3203.58_
3247.00
3289.36
8900. .... 7900
9000. 7982
9100 ....... 8067
9200 ..... 8154
9300. 8241
9400 ......... 8327
· 05 ....... 35__15
· 71 34 15
. 97_ ........... 31__30
· 58 30_ 0___
.40 29 45
· 34 ........ 30_.45
N_.45..E ......... 1.79 ..... 3727.75 ..... 1693.92
N 46 E 1.15 3782.55 1733.01
..~__45_E ......... 2..80 .... 3833.21 ......... 1769.96
N 45_E ........ 1.50 ...... 3881.68 ...... 1805.32_
N 45 E 0.24 3929.79 1840.40
N..51~E .......... 3.18 .... 3980.40 ..... 1872.58 ....
3330.17
3370.65
3407.60
3442.96
3478.04
3517.78~,=..
9500
9600
9700
9800
9900
0000
0100
O2OO
0300
....... 8415
· 8506
. 8598
· 01 28.45 ........... N~_49_E .......... 2.23 ....
.89 23 15 N 46 E 5.65
· 94 .......... 23__ 0 ......... N 45.E .......... 0.46__
4027.74 ..... 1904.14 ............
4066.18 1931.56
4104.06 ......... 1959.19 .....
3554.08
3582.47
3610.10
...... 8691
· 8784.83
. 888b.o7
.... 8976 . 55 ......
. 9073.25
..... 9170.69
.16 ....... 22..45 ........... N~45._E ....... 0.24 .... 4141.55 ......... 1986.53 ............ 3637.45
20 30 N 42 E 2.50 4175.01 2012.56 3660.88
1~__45 ..... N~..41.E ........ 2.76 ..... 4203.98 ....... 2035.56 3680.88
15__15 ........... N_42. E 2.51 4229.11
14 45 N 43 E 0.56 4253.56
13. 0 ......... N.39 .E ............ 1.99 .... 4274.67
...... 2055.11v_ ........... 3698.48 w/
2073.73 3715.85
2091.21 .......... 3730.00 ......
MOBIL OIL CORPORATION ~AGE '3
GRANITE POINT-STATE MUC 1 ............................................... 4-I3-69
GRANITE POINT VERTICAL SECTION COMPUTED ALONG CLOSURE
ALASKA ................................. ~ ......... ~
I
................................ SPERRY-SUN WELL SURVEYING COMPANY
RECORD.OF_SURVEY
............................. TRUE '--INCLINATION ...... DIRECTION DOG-LEG ..................... RECTANGULAR.COORDINATES
MEASURED VERTICAL ' -- SEVERITY VERTICAL
............ DEPTH .._ DEPTH ...... DEG MIN _] ...... Z._DEG ...... DEG/iO0. SECTION ...... NORTH ._ SOUTH. EAST _ WEST
10400 ..... 9268.12 .............. 13 ...6 ........ N 38_E ....... 0.22 .4295.65 ..... 2108.94 ........... 3743.85 .......
10500. 9365.66 12 45 N 33 E 1.14 4315.45 2127.45 3755.87
.10600. ..9463.09 k13.. 0 ......... N.29_E .......... 0.92 ~_4334.90 ..... 2147.1Z ....... 3766.78
10700._ _. 9560
10800. 9656
10900 ........ 9753
· 02 .......... 14 15 ..... N 29 E .......... 1.24___
· 83 14 30 N 23 E 1.50
· 97 ............ 13__45 ....... N~ZO..E 1.04
4356.18 ...... 2168.65
4376.39 2191.70
4394.81 ..... 2214.04 ..............
3778.71
3788.49
3796.62
11000. __9851.50 .......... 12_ 45 ..... N 1.4_E ......... 1.69 .... 4410.37 ....
11100. 9948.64 13 45 N 8 E 1.69 4425.27
11150 ....... 9997.10 ............ 14.15 .......... N_ 7__E ......... 1.11~ _4432.82
2235.45 ............... 3801.96
2258.99 3805.27
....... 2271.20 .............. 3806.77__._~"~_
THE CALCULATION ~R6C~E6~'~"A~'~'ASED ON THE USE OF THE TANGENTIAL OR CHORD METHOD
HORIZONTAL DISPLACEMENT = 4432.82 FEET AT NORTH 59 DEG. 10 MIN. EAST(TRUE)
:-
FOR
MOBIL OIL CORPORATION
......... I I I , Il 3
Surwel Gyroscopic Multishot Directional
TYPE. OF SURVE'Y'
SURVEY DEPq'H: FROM
300 _ ~v. TO 5970
MUC Granite Point 1
LEA~E: .WELL NO.
Granite Point
FIELD:
Kenai Pen. Bot.
COUNTY/PARISH
February 18, 1969
~%TE OF SURVEY
OFFICE: Andhorage, Alaska
Alaska
. .. STATE
SU-3-16425
JOB NO._ _
C IYl~iON OF O!t ~D O," S
AK~IOW, Oe
.......... NU¢-.,1. ....
GRAN]TE PO]NT
.ALASKA ~_
VERTICAL S£CTION COMPUTED ALONG CLOSUR5 '
S P_E RRY_-._S UN _W E L L_ S UR.V E Y_LN G_C 0 M P ANY
I
S U-__3_-_1.6 z~ 25.
_____RECORD__OF_ SURVEY.
_TRUE____ I N C LI.NA_T.I ON __DLR E C_T_I 0 N__DOG-..L EG
MEASURED VERTICAL
DER.TH ...... D E P_T .H_ . DE.G _M_I.N___.__D.E G_ ........
,_.30_0..___ 299_. 9.5 ........ SU=3=1.6..4.1.2
400. 399.87 2 I5 N 73 W
....... 500 · 49.9 · 82 1..__4.5 ___N_I.g__E
__.600 ..... 599..63
700. 699.13
_ 800 ....... 798.22
SEVERITY VERTICAL
DEG/.' 1 O0 .... SEC_T_I_ON,,
0.00 -6.75
2_. 8.9 -4_..8 5
...... R. EC.T_ANGU LA~__C O0 R D_I N A_T_E S ....
· NOR_TH SOUTH' _.EAS_T____WE_S
. _3 30 ..... N_3_7__E. I_..Q1 ......... 0.23
5 45 N 57 E 2,73 9,97
_7_.4.5~ ....... N._7.4._E ......... 2., .8 0 .... 2 3.,.4 3
0,65
.___~_._54
8_-_4_ 2
13,87
_.1.7...59.
-.6.. *'
5.67
8.,,.6 3 .......
9_0.0.. 89 6_. 7_0
1000. 994.04
__i_100. I090..04
1200
.____I184.16
1300. 1276.04
1400.__.1365.34
___ 1.500 .___.17 52 · 3?
1600. 1536.94
__1700 ..... 1618.86
___I800.___ 1697.
.1900. 1773.
. i~?~__~. _~._.2000 ,__,1.849_.
2100 ..... 1927
.
2200.
2300 ·
!0__0 N_ 7_7._E__
13 15 N 79 E
i_6__I..5 .... N 80 E
2500 ·
_2600 ·
23 15
· 2.6 45
2.. 2_9 40.. 68______2_1_:_5_0
3.27 63.36 25.87
3...01 90_.~ 9_6 30.73
58.05
8
. N._ 83_. E_____L 3...6 l___._l. 23.. 96
N 80 E 3.66 162.89
N 80 E 3_._.50~2P.7_._2_9
2~_~0_
32 15
_3_5.__0.
41.70
_119 ._15
158.02
_2D2_.~35
N._80._E 2...74 255...87
N 80 E 2.74 308.50
N.79.. E ..... 2...80__.__365.24
39 ........ 38__15____ _ N_80 _E
72 40 15 N 81 E
.76 40__3_0 N 80 E
5.8.:_07
67,33
_7_8.._2.8
, 250.85. ....
303.40'"'
____3 53.,..Zo
_3.3 0________~426 . 31__~.89_.D B__
2.09 489.85 99.14
0_..69 553.9 ~_.: !!
420.6_7
484.49
548.44
19 ..... 39 __15 ........ N_.79._ E______I_. 40 ...... 616 . 4.9
2005.18 38 45 N 79 E 0.49 678.41
.... 208?..25 37_.4_5 N 78 E 1_..1.7__~_._%3_9.11
,.1_.22 ,.49 6.10...55
I34.43 671.99
__14ff.._.16 731.88
- -.
2164..90 __36 I5 N___78~..E 1_..4.9___7_97..7_4_._.__159.45_ 78%._7_2
2246.81 35 0 N 78 E 1.25 854.62 171.38 845.82
232 9.22 ........ 34,. 30 ...........N._.7.8.. E. ......... 0 ._4.9 .... ._910 ..78 ......... 183..: 15 ..... .9.0 !.-. 22
MOBIL OIL CORPORATION
MUC-I
GRANITE POINT
__ALASKA .
Z-18-69 .... SURVEY -DATE ....
VERTICAL SECTION CONPUTED ALONG CLOSiJRE
SPERRY=SUN,WELL_.SURVEYING-COMPANY
RECORD.OF..~URVEY
SU-3-16425
3RUE ....
MEASURED VERTICAL
DEPTH .... DEPTH
2700. _..2413.80
2800. 2499.51
2900.~__2585.45
3000 .... 2670.49
3100. 2755.53
3200 ..... 2840.56 ....
.INCLINATION .... DIRECTION._DOG-LEG--
SEVERITY VERTICAL
...... DEG_MIN _DEG ..... DEG/IO0 ..... SECTION
__RECTANGULAR _COORD I NAT ES __
..... NORT. H .... SOUIH .... EAST ....... WES
..... 32 ..15.
31 0
30_45 .....
31_45
31 45
_31 ..45 ........
....... N..76.F .,2.50 ...... 963.
N 69 E 3.87 1015.
.N..68_E ...... 0.57___1066.
__ N _66 _F
N 66 E
_N..66_ E .....
__.l.A4 ____1118.
0.00 1171.
__0.00 .... 1223.
90 ....... 196.06 ..... ______.__953
38 214.52 ' 1001
46 ..... 233..67. 1048
92 ..... 255.08__ 1096
37 276.48 1144
83 .... 297.88 .... 1192
.00.
.08
.49..
. ,v
56
.63
.31_
3300.____2925
3400. 3011
3500 .... 3097
.3900. .... 3447
4000 · 3536
..... 4100 ..... 3624
· 82 .....~.I._30
.32 31 15
. 26 .....30____45__
3600.___.3184.08,
3700. 3271.96
3800.____3359.63
N_]66_ E_.-]-_],_. __, 0.. 24___127.5_~ 91 ....
.
N 67 E O. 57 1327.69
N ...66_E .... 0...71 .....1378...66___
29...45 ......... N.,.6.6_F
28 30 N 66 E
28_45 --- .N..~7_E.--
j lg. IA_ ,1240.~
339.41 1288.19
36.0...20 1339.90._
O. 9 9 ;_.._~ 428.
1.25 - 1475 ·
_0.. 54 .... 1523..
13 ...... :380.38 .... 1380.23_
69 399.79 1423.82
7_0__.__418_. 59 ' ..1_468.. 1_0_ Z-//
.72 ........ 28..15 ........ N._,66_.E
.01 28 0 N 65 E
.10 ....... 28__15 ...... N,_65 F
_0.69 _____1570.
0.53 1617.
_0.. 24_____1664 .
88.~~3.7.84
61 45.7.68
72 .......... 473..68
_15.11.34___~
1553.89
1566..78.
., 4200 ..... 3712
~ 4300. 3801
..4400 3891
~ - ': · 4500 .... 3982
~:~ ..~ ~' 4600. A073
b ~;~_ 1~ 4700 ..... 4164
' ~' 4900~ 4347
............. 5000. ._ 4438
.40 ..... 28 _0 ....... N_66.E,
.50 27 0 N 64 E
· 57 ....... 25..~5 N,_65_.E
.20 .......... 25 ..0. N_63..E ........
.55 24 0 N 62 E
. 73 __2_4. _15 N_.62_E
0.53. __1711.52 .....
1.36 1756.62
1.. 32 ..... 1.799_. 86
__1.13 ..... 1841.
1.08 1881.
___0.24 ...... 1922.
· 91 .... 24__15 N__63..E .0.41 ..... 1963.
.26 24 0 N 65 E 0.85 2003.
.97 ......... 23_.30 ............N,.62.E ......... 1.30 .......2043.
____496.78
516.68
5_3. 5.._0_4
76 .... 554.23
98 573.32
5 9~ ..... 5 9 2_. ,6 0
31 .... __611 · 25__.,,.
79 628.44/
23 .......... 64.7
- _1639.67_
1680.48
.1_'7_!.9.._8 5 ......
1757.51
1793.42
__1_829.68
_1.866.28
1903.14 ~---
1_938.35.
MOBIL-' OIL COP, PORATION
.HUG-1
GRANITE POINT
_ALASKA ......................
VERTICAL
2". 1
SECTION
· '~ I~Vla~~''~ ~
__SURV EY._.DAT E _.
COMPUTED ALONG CLOSURE
_SPERP~Y_-SUN _WELL_ SURVEYING_COMPANY_.
__S U_-_3_-_:L6o.4 Z5
RECORD..OF_SUR.VEY~ .......
.... T RUE__ __I NC L.I N A..T.I ON__DJ R.E.C_T_IDN__ O 0 G-.. L E G
MEASURED VERTICAL
...... D E_P.T.H. _D E R T.H.
5100..____.4530._14
5200. 4621.67
:__53.qo .____4_7.13...3.8
R E C_T_AN GU LA R_CD 0 R D.I.N AI E S___
SEVERITY VERTICAL
D_E G__M.I_N .DE.G_ .... D E_G./_I.O 0 .... SEC!_I O_N== NOR_T. H___S O_U_T H E__A.S T WE
2.4__1.5 ..... N_6.3__E 0 . 8
23 45. N 64 E 0.64 2123.95 683.46 2011.14
.... 23__3_0 . . _ N_.6_5__E__.____O.._4_7 '____2.1.63.. 64 7..00_._3.1 ...... 2_0.4.!. 28_
5400.____4805.09
5500. 4896.97
..5600. ..... 3989.02 ....
23_..~.0__ N_6.5 E 0.,.00___22Q3 , 33 __7_.1.7_,.1_6 20_8_3_, 42
23 15 . N 64 E 0.46 2242.55 .734.47 211'8.90
~ E . · .
__.2.3____0. 'N_ 6:~ ......... 0 ~6____2.281 44_____._7_5.0_..9.8__ 215_4....31
5?OP..: 5081.07__
5800. 5171.70
5~0.0 ._ ..... 5259? 99
. ..... 5321.
,~ ........ 5.93.0
**** THE_CAt
2~_...._0 N_.65 E __0,_00. ..... 2320.3.3 7.6.7_,5_9 2_189_._72
25 0 N 66 E 2.04 2362,46 784.68 2228.33
28 0 N__ _6_9_. E 3..- 28____ 2.4_Q9_. _3_c)_ .....8_0_ 1 ,.._5_1 2272· 16
..)
80 ...... 2.8__. 0___________. N.. 69_.E ....
0.0.0 ..... 2442...2.4
.8.13...29 .__._2.3.0.2.._84 ~
\
C_ULATION PROCED._U_RES_A.~E___BASE_D_O_N_THE_U_SE OF THEffAN. G~E._NTIAt__OR CHORD METHOD
_ H_.OR.I ZON'[A_t,_.D_I_SP. LACE.MEN.T___= .... Z.qS_2.. 2.4
FEE_T_.A]'_NORTH /.O_D_EG_.__....~Z__MI_N_.._EAST_.L_T__RU.E )
! '
I ELL
,
COMPANY MOBIL OIL CORPORATION JOB NO.
WELL GRANITE POINT STATE MUC ~I-1 LOCATION GRANITE POINT FIELD
STA. RE-' MEAsuRED COURSE DRIFT VERTICAL DEPTH COURSE DRIFT COORDINATE DIFFERENCES RECTANGULAR COORDINATES SECTION
NO. MARKS DEPTH LENGTH ANGLE COURSE TOTAL DEVIATION DIRECTION NORTH SOUTH EAST WEST NORTH SOUTH EAST WEST
11617 16 30 10447 70 N 7 W 2392 61 3811 '45
11702 16 45 10529 09 N 13 W 2416 48 ,-~ 3805 94
11806 17 15 10628 141 N 15 W 2445 54 3797 96
11908 15 45 10726 58 N!20 W 2471 55 3788 50
12028 15 30 10843 21 ,N 23 W 2501 07 3775 198
12111 15 30 10923 19 N 24 W 2521 23 ,, 3766 96
12326 17 30 11128 24 N 31 W 2577 56 3735 08
12410 15 45 11209 19 N 33 W 2596 68 , 3722 66
,
12539 16 15 11333 03 N 38 W ' 2625 13 - 3700 44
12625 15 30 11416 10 N 40 W 2642 18 r 3686 13
12737 ' 14 15 11523 68 !N 44 W 2661 84 3667 14
,,,
12791 13 i45 11577 10 N 42 W 2691 55 3658 39
12857 14 15 11641 07 N 43 W 2683 43 3647 31
' !
12925 14 45 11706 83 j N 43 W 2696 09 3659 11
-, ,
13157 14 30 11931 43 N 44 :W ...... 2737 87 ,,, 3595 16 , ,
, , ,
13233 14 30 12005 17 N 45 W 2750 88 3582 15
,
13302 13 45 12072 19 NI45 W: 2762 47 2570 56
,i
13375 14 00 12143 02 N 49 W 2774 05 2557 23
13483 13 30 12248 04 N 50 W 2790 26 '"" 3537 92
,
COMPANY,
MOBIL OIL CORPORATION
WELL GRANITE POINT STATE MUC ~I-1 LOCATION
JOB NO.
GRANITE POINT FIELD
, , ,
STA. RE- MEASURED COURSE DRIFT VERTI~M.' DEPTH COURSE DRIFT COORDINATE DIFFERENCES "1 RECTANGULAR COORDINATES
SECTION
NO. MARKS DEPTH LENGTH ANGLE COURSE TOTAL DEVIATION DIRECTION NORTH SOUTH EAST WEST NORTH SOUTH EAST WEST
_
13834 11 30 12581., 42 N 50,. W 2836 50 ., 3509, 99 L.
13872 12 15 12618 55 N 47 W 2842 00 3515 88
13917 12 00 12662 57 N 49 W 2848 14 3471 70
14057 12 15 12799 38 N 47 W 2868 40 3449 97
14155 12 00 12895 24 NI 53 W 2880 74 3433 77 t. ~ ¢ ~
...............
14195 12 30 12934 29 N'53 W 2885 95 3426 85
14293 13 00 13029 78 N 55 W 2898 60 3408 79
14451 13 00 13183 73 N 54 W 2919 28 3379 87
14546 13 30 13276 11 N 57 W 2931 36 3361 27
14641 14 30 13368 08 N 53 W 2945 68 33 42 27
14820 13 00 13542 50 N 55 W! 2968 77 3309 28
15058 14 30 13776 51 N 58 W 3000 35 3258 75
15261 14 15 13973 26 N 57 W 3027 57 3216 84
15416 14 00 14123 66! N 60 W 3046 32 3184 37
15531 13 30 14236 49' N 59 W 3060 14 3161 i36
15639 12 15 14343 01 N 57 W 3072 74 3148 76
15700 12 45 14402 51 N 59 W 3079 68 4 3137 23
?
.~. l,J d /~ /~ . ~ ~ I Z'-7 jl,~~
......... ~ ... ~.~ , ,i;/, ~:'. ....
P,O. BOX 2127 * ANCHORAGE. Ai. ASKA
TRANSMITTAL,
STATE OF AIAS~C~
Di~_sion of Oil & Gas
~mchorage, Alaska
Attn: Mr. Iiarry Kugler
Dear Sir:
CO~P~G~Y
J~flv 22. 1969
have transmitted this date via __ Personal D~li¥cr~; .....
fi,lashed f~_ Ccre ,, ~ ., samples £rom the:
Mobil Oil Cor.o~_- l_!~C No. I-1
Core NOo 1, 2, 3, ~ & ~
Colorado Oil & Gas Co. - Shaviovik No. 1
8 Box~.s - Washed 1170-7990
Core No. I & 2
Union Oil Co. - Trading Bay Unit G-30
i Box - k%shed 10,620-11,h50 ·
- Nc. 1 Fishhook
Hill ~-oductions Co. ' -
1 Box - Washed 40-23~0
Please acknowledge receipt by returntnE one copy of this transmittal.
Very truly yours,
Bonsld G. Brockway
American Stratigraphic
2CB; JP
Receipt acknowledged
Remarks:
by
date
Form
REV
STATE OF ALASKA
Sul~nit "Intentions" in Triplicate
"Subsequent Reports" m Duplicat~
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS O,N WELLS
(Do not use this form for proposals to drill or to deepen or plug back to a dffflerent reservoir
Use "APPLICATION FOR PEKMIT--" for such proposals )
0IL GAS []
WELL WELL OTHER
2 NAME OF OPERATOR
Mobil Oil Corporation
3 ADDRESS OF OPERATOR
P.O. Box 1734, Anchorage, Alaska 99501
4 LOCATION O'F WELL
At surfaoe (Leg 3, Conductor 3)
2391' South & 1379' East from NW corner,
Section 13, T10N, R12W, S.M.
13 ELEVATIONS (Show whether DF, RT, GR, etc
106' MLLW (KB)
Check Appropriate Box To [ndi'cate N~at'ure of NOtice, Re
~-API N~CAL CODE KLV - , ~'~/~,/-_--
5-133-20179 ~v ~
~ D~GNA~O~ ~D S~6 .....
REL
ADL 18761 & ~
ADL ~874Z -
Granite Point State 18742
9. WELL NO.
M.U.C.
10 FIELD A~rD FOOL, OR WILDCAT
Granite Point - Middle Kenai &
Wildcat
OBJECTIVE)
Lease Line 500'W of NE corner,
Section 13~ T10N~ R12W~ S.M.
12 PER/VIIT I~O
69-9
~, o~ Other Data
NOTICE OF INTENTION TO:
TEST WATER SHUT-OFF I I PULL OR ALTER CASING
FRACTURE TREAT ~ULTIPLE COMPI,ETE
SHOOT OR ACIDIZE AEANDON$
REPAIR WELL CHANGE PLANS
lO,her) Refer to Notice 6/24/69
FRACTURE TREATMENT I--t ALTERING CASING --
SHOOTING OR ACIDIZING ~ ABANDONMENTa J X .[
(Other)Abandoning exploratory portio~-~
NoTE: Report results of multiple completion on Well
ompletion or Recompletton Report and Log form )
hole
15 DESCRIBE PROPOSED OR C0'4PLETED OPERATIONS (Clea~ly state all pertinent details, and give pertinent dates, including estimated date of starting an~
proposed work.
9 5/8" casing is cemented through the Middle Kenai producing interval, and the exploratory
.... portion of the hole from 11,257' to 15,715' T.D. was plugged and abandoned as follows:
1) With open end drill pipe at 12,894', placed a 100 sack Class G cement plug on 6/27/69
2)
With open end drill pipe at 11,458', placed a 125 sack Class G cement plug on 6/27/69
Ran in with bit and located top of cement at 11,269' (12' below 9 5/8" casing shoe).
With open end drill pipe at 11,268', placed a 100 sack Class G cement plug. Cleaned
out firm cement to 11,242'. Set a cast iron bridge plug on wire line at 11,239'.
Pressure tested casing to 3000 psi O.K.
3) Prepared to complete Kenai sands for production.
TXTLE Area Engineer DATE 7/9/69
(Thl~ ~pace for State office use)
APPROVED BY
CONDITIONS OF APPROVAL, IF AN~:
TITLE DATE
See Instructions On Reverse Side
Appr~ e~ Copy
Reyn~d
(/p --
lvo~'m No
1R.EV
(
STATE OF A. LASKA
OIL AND OAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
SUBMIT I!~ DUPLICA%~E
~ NAME OF OPEP~ATOR
Mobil Oil Corporation
AP1 NUAiERICAL CODE ~ ~
API 5-133-20173 OKG
LEASE DESiGNA~--ION A\-D SE~A~ NO
ADL 18761 & MWK ~
18 7 4 2
4 LOCATION OF WTM
(Leg 3, Conductor 3)
2391'S & 1379'E fr NW Cor., Sec.
T IF INDIA]~, ALOT/-EE OR TRIBE NAME
8 L~.'IT FA~RA{ OR LEASE N-kM~J~nn ~
~Mobi]..-UnioD St~te.~T%& .~
uranzte ~oznt State J87~z
ADDRESS OF OPEI:~ATOR 9 %VELL NO
P. O. Box 1734 Anchorage, Alaska 99501 MUC #1-1
uranzce §~L~n~RD'I~f~le Kenai
& Wildcat
13, TION, R12W, S.M.
11 SEC , T R, M (t~TTOM HOLE
OB.mCrnrs)
Lease Line 500' W of NE Cor.
Sec. 13, TION, R12W, S.M.
1~- PEfi2VlIT NO
69 -9
13 RF-2~ORT TOTAL DP/H AT END OF MONI"rI, CIiA~NGF, S IN HOLE SIZE, CASING ~ CIIMEI~TING JOBS INCLUDING DEPTH
SET AJN-D VOLU1VIES USET), PEIR~ORATIONS, TESTS A/ND I:LESULTS, FISHING JOB~, JLrNK IN HOLE AND SlDE-~CKED HOLE
ANT) ANY OTHER SIGNIFICANT CI-IANGES IN HOL~ CONDITIONS
June 1969
Drilled 8-1/2" hole 14,655'/15,700'
Core 15,700'/15,715'
Ran Electrical logs
Placed 100 sax Class G cement plug at 12,894'
Placed 125 sax Class G cement plug at 11,458' and a 100 sax class G cement
plug at 11,268'. Cleaned out firm cement to 11,242'. Set cast iron bridge
plug in 9-5/8" casing at 11,239'. Pressure tested 9-5/8" casing with 3000 psi, ok.
July 1~ 1969
Preparing to perforate Middle Kenai zone for production.
SXGmm -- (/L/~-~ ... T~TL~ Area Engineer DATE Julv 8_ 1969
ll J k~-~ - '
¥ / ·
NOTE--Report on this form ~s r~ulred~/for each calendar month, regardless of the status of operat,ons, and must ~ filed m duphcate
w~th the D~ws~on of Mines & Minerals by the 15th of the succeeding month, unless othe~se d~rected
l~rm No
(
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMI'ri'EE
SUBMIT IN DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1.
~ NAME OF OPERATOR
Mobil Oil Corporation
3 ADDRESS OF OPERATOR
P. O. Box 1734 Anchorage, Alaska 99501
4 IX)CATION OF WF_.,L~
(Leg 3, Conductor 3)
2391'S & 1379'E fr NW Cor., Sec.
13, TION, R12W, S.M.
APl NLrMERiCAL CODE
API 5-133-20173
6 LEASE DE~iGBIA~--ION AND SE'RIAL 1~O
ADL 18761 &
ADL 18742
IF INDIA~', ALADTTEE OR TRIBE NA~E
8 L.~IT F.~! OR LEASE N a_ME
obil.-Unio~ .State ~11~742
ranzge ~olnn State
g WELL .%'0
MUC ~)I-1
10..FLELD.
uranlce §~n~R~'I~f~le Kenai
& Wildcat
11 SEC . T, R, M (BO~I'I'O,%J HOI~E
OBJmCrnm)
Lease Line 500' W of NE Cor o
Sec. 13, TION, R12W, S.M.
12 PI~MIT NO
69 -9
3 REPORT TOTAL DI~TH AT ~2~ID OF MONTH, CI-LA-~¢GES IN HOLE SIZE, CASING ~ CLWIF_~TING JOBS INCLUDING DEPTH
SET ~ VOLUM~ USED, PF~R.FOB-~TIONS. ~-~TS ~ I~ESULTS. FISH/NG JO~, JI/NK L~I HOLE AND SIDE-~-R.~CI~D HOLE
A_ITD A_NY OTHER SIGNIFIC/tNT CH~GES IN HOL~ CNDbrDITIONS
June 1969
Drilled 8-1/2" hole 14,655'/15,700'
Core 15,700'/15,715'
Ran Electrical logs
Placed 100 sax Class G cement plug at 12,894'
Placed 125 sax Class G cement plug at 11,458' and a 100 sax class G cement
plug at 11,268'. Cleaned out firm cement to'11,242'. Set cast iron bridge
plug in 9-5/8" casing at 11,239'. Pressure tested 9-5/8" casing with 3000 psi, ok.
July 1, 1969
Preparing to perforate Middle Kenai zone for production.
14 I hereby ce~,~ t~t the/o[egpmg m true and~ .c~'reet
.,UW~D~~ ~~~ ~ =~ Area Engineer m*= July 8:1969
,, ~7 h~9'~ .....
/
~OlE~Report on tins form ~ re'toreador eaca calendar moatk r esar~less o~ t~e statu~ ot onerauoa% aaO must ~ i~le~ m guplicate
with the D,v,s,on of Mines & M,nerals by the 15th of the succeeding month, unless other,se d~rected ,:
Form ]P---3 (
REV 9-30-67
STATE OF Ai~KA
Subrrflt "Intentions" in Triplicate
& ' Subsequent Reports" in Duphcate
OIL AND GAS CONSERVATION COMMITTEE
SUNDRY NOTICES AND REPORTS ON WELLS
(DO not use th~s form for proposals to dr~ll or to deepen or plug back to a dff£ierent reservoir
Use "APPLICATION FOR PF_,R2~IT--" for such proposals )
0IL
WELL [] GASWELL [] OTHER
Mobil Oil Corporation
ADD~S OF OPhiR Alas~
P.O. B~ 1734, Anchorage, 5
DCATION O,F
~e (Leg ~, oonduc~or
2~91~ S~Lh & 1~79~ EasL
Section 1~, TION, R~, S.~.
13 ELEVATIONS (Show whether DF, RT, GR, etc
lO6' MLLW (KB)
14 Check Appropriate Box To I~ndi'cate N~ature of NOtice, Re
"5' API NT~CA_L CODE ~KO _~
5-133-20173 ~LV
sADLLEASE 18761DES~GNa~ON& ~n S~~ ~_--
ADL 18742
7 IF ~I~, ~'l'r~ OR ~BE N~
8 UNIT F~ OR ~SE N~E .
Hob[i-Union State ~)1 &
~ran~te ~o~ne Sgage 18762
~ ~B~O
~.~.C.
Granite Point ~le Kena~ &
Wi I dea~
O~E)
Lease Line 500'W of ~ corner,
Section 13~ T10~ R12W~
69-9
~, or ~her Data
NOTICE OF INTENTION TO:
FRACTCBE TREAT MULTIPLE COMPLETE
8HOOT OR ACIDIZE ABANDONs
REPAIR '~'ELL CHANGE PLANS
(Other)
BUBBEQUENT REPORT OF:
FRACTUaE TREATMENT ALTERING CAGING
SHOOTING OR ACIDIZING ARANDONMEN'T*
(Other)
NOTE' Report reeults of multiple completion on Well
ompletion or Reeompletion Report and Log form )
15 DESCRIBE PROPOSED OR CO~YPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an)
proposed work.
The 9 5/8" casing is cemented through the Middle Kenai producing interval and it is
proposed to abandon the exploratory portion of the hole from the 9 5/8" shoe at 11,257'
to 15,715' T.D. and complete in the Middle Kenai as a producing oil well. No
productive permeable zones were encountered in the exploratory portion of the hole.
As per verbal approval from Mr. Gilbreath on 6/19/69, the following abandonment
procedure will be followed:
1) With open end drill pipe at 12,900' (Top of the Hemlock formation), place a
100 sax Class G cement plug in the 8 1/2" hole. Calculated fill 290'.
2) With open end drill pipe at 11,460' (200' below the 9 5/8" shoe), place a
125 sax Class G cement plug. Calculated fill 300'.
3) Clean out cement in the 9 5/8" casing to within 30'+ of the shoe, set a cast
iron bridge plug on top of the cement, and complete the well as a Middle Kenai
producer.
NOTE: Heavy drilling fluid will be left in the abandoned portion of the hole. ~] ~ ~ ~L,~ ~'
TITLE Area Engineer DXT~ June 24, 1969
See 1,nstructions On Reverse Side
Approved Copy
Returned
1"orTn No P--4
REV 9-~-6'~
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMI~EE
SUBMIT ~ DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
NAME OF OPERATOR
Mobil 0il Corporation
ADDRESS OF OPEI~ATOR
P. 0. Box 1734 Anchorage, Alaska 99501
LOCATION OF WELL
(Leg 3, Conductor 3) _
2391' South & 1379' E from NW Cor., Sec. 13,
TION, R12W, S.M.
AP1 NL~{ERI~AL CODE
API 5-133-20173
6 LEASE DESiGnATION AND SERIAL NO
ADL 18761 &
ADL 18742
IF INDIAL~', ALOTTEE OR TRIBE NAME
1£ unlon Stage ~£ &
Granite Point State 18742
9 WELL NO
Mug #I-1
10 FrF. l.r~ AND POOL OR WILDCAT
Granite Point-Middle Kenai &
Wildcat
11 SEC, T. R, i%~ ('BO'I'I'OM ItOL~E
O
Lea~e 500' W of NE Cur.
Sec. 13, TION, R12W
12 PElt.MIT NO
69 -9
13 REPORT TOTAL DEPTH AT E2gD OF MONTH, CHA~NG~S IN HOLE SIZE, CASING A_N-D CEA~ENTING JOBS INCLUDING DEPTH
SET ~ VOL~ USED, P~O~TIONS, ~TS ~ ~SULTS FISHING JO~, J~K ~ HO~ ~D SIDE-~C~ HO~ . ] ~
~ ~Y O~R SIGNIFIC~ ~G~ ~ HO~ ~ITIONS HLB
May 1969
Drilled 12-1/4" hole 12,911'/12,975'
Core with 8-15/32" bit 12,975'/13,017'
Ran O.H.D.S.T. #1 12,910'/13,017'
.IFP 30 rain 1~61 psi . /
ISIP 120 min 7490 psi /
F~? 240 min 1779 psi
/
FSIP 480 min 7514 psi
Recovered 54 bbls water cushion .
7 bbls rat hole mud
1-2 bbls dk. brn. oil .~~,~.~//
1-2 qts. brackish water /
Drilled 12-1/4" hole 13,017'/14,641' /
Core 14,641'/14,655'
/
.Jume 1:1969
TRM
OKo .,,
KLV
HWK_ ~<
Drilling ahead with 12-1/4" bit @ 14,655'
s,,c. mm /..~.~...--~.,~./~~~~ .=r~z Area Engineer r,A'rx June 13, 19_69. ,,
NOTE--Report 0n this form IS r~/ed for each calendar month, regardless 0, the status of operations, and must 0e flied ,ri d~hcate
w~th the D~wsmn of Mines & MineraFy the 15th of the succeed,ng month, unless otherw,se directed
/
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMI~EE
SUBMIT IN DUPLICATE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
1
OIL
NAME OF OPEP,.ATOR
Mobil Oil Corporation
3 ~nDR~SS OF OPm~OR
P. O. Box 1734 Anchorage, Alaska 99501
4 LOCATION OF W~[~L
(Leg 3 Conductor 3)
2391 'South and 1379' East from N~ Cdr. Sec. 13, TION,
R12W, S.M.
APl NU~iERICAL CODE
API 5-133-20173
LEASE DESiGNA x--ION A\-D SEqRIAL NO
ADL 18761 &
ADL 18742
IF INDIAN, ALOTTEE OR TRIBE NAME
ri-Union State ~fl &
Granite Point State 18742
9 WELL NO
MUC
10 Fie:lI~ AND POOL OR WILDCAT
rsuitePoint Middle Kenai
liOcat '
11 SEC . T, R, M (BOTTOM HOLE
o~
Lease Line 500'W of NE Cdr. Sec 12
TION, R12W
12 PEPdVIIT NO
'"'13 REPORT TOTAL DEPTH AT END OF MONTH, CI-IA-NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH
SET A_ND VOLUMES USED, PERFORATIONS, TESTS A1TD I:{.ESULTS FISHING JOBS, JU'NK IN HOLE AND SIDE-T'R~CKED HOLE
AND ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS
April 1969
Drilled 12-1/4" hole 10,775'/11,158'
Stuck drill pipe with bit at 9975', back off @ 9880'.
Screwed into fish with jars in set-up and recovered fish.
Ran Schlumberger electrical logs.
Drilled 12-1/4" hole 11,158'/11,298'.
Cemented 9-5/8" casing @ 11,257' with 900 sex class G cement.
Drilled 8-1/2" hole 11,298'/12,911'.
HLB
TRh~,
OKO
KLV
HWK
FILE
May 1, 1969
Drilling ahead with 8-1/2" bit.
m/ y 1 $ 7 69
Area Engineer ,
$IGN]~D~''~ ~,"*~~~/~ TIT-J..~ DA~ May 14 1969
NOTE--Report on thls/f~rm is required for each calendar month, regardless of the status of operations, and must be filed in duplicate
w~th the D~ws~on of Mmes & Minerals by the 15th of the succeeding month, unless otherwise thrected
l~rm No
~v 9-~-~ STATE OF ALASKA
OIL AND GAS CONSERVATION COMMIYI'EE
MONTHLY REPORT OF DRILLING
AND WORI¢OVER OPERATIONS
1.
~t'WLL WELl, OTHER
2 N~JN~E OF OPEI~TOR
Mobil Oil Corporation
3 ADDRESS OF OPERATOR
P. O. Box 1734 Anchorage, Alaska 99501
SUBMIT IN DUPLICATE
4 LOCATION OF WMLL
(Leg 3 Conductor 3)
2391'S & 1379'E from NW Cor. Sec 13, TION, R12W, S.M.
-~ Am ~mC~L coDE
API 5-133-20173
6 LEASE DES-'GNA~--ION AND SERIAL
ADL 18761 &
ADL 18742
IF INDIALT, ALOTTEE OR TRIBE NAA~IE
8 L.~IT F.~AI OR LE&SE N~ME
Mobfl Union State #1 &
Granite Point State 18742
g WELL NO
MUC #I-1
10 FIF. I,r~ A.ND POOL OR 1% ILDCAT
r0 ite Point,Middle Kenai
ltacat
11 SEC. T. R. Ii (BOTTOM HOL~:
L o~uzcTq~)
ease ,.zne 500' W of NE Cot.
Sec. 13, TION, R12W
12 PERMIT ~O
69 -9
13 REPORT TOTAL DEl'TH AT END OF MONTH, CHA~N'GES IN HOLE SIZE. CASING A_N-D CL'MF-~NTING JOBS INCLUDING DEPTH
SET AND VOLUIVIES USED, PKt:LFORATIONS. TESTS A/~D I:LESULTS FISHIIN'G JOB~ JLrNK L%I HOLE AND SIDE-TR~CKED HOLE
AND ANY O'rH~R SIGNIFICANT CI-LkNGES IN HOI~ CONDITIONS
.March, 1969
Drilled 12-1/4" hole 5715'
to 10,775'
~pril 1, 1969
Drilling ahead with 12-1/4" hole.
DIVISION OF OIL AND GAS
ANCHO~
14 I hereby certify that-the for_egomg ~s true and correct.
e' ' '"'/ f ///. Area Engineer April 17 1969
· ' /
ill ii i ii ii i i
NOl£~Report on th,s form ,s require~ for each calendar mo.th, r e~ardle$$ o~ the status o~ ope;'at,on% an~ must be
w~th the D~wsion of M,nes & M,nerals by the 15th of the succeed,ng month, unless otherw,se d,rected :
lV~r-m No P---4
STATE OF Ab/kSKA SuBMrr IN Z~PLZC*..~
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
NAME OF OPerATOR
Mobil Oil Corporation
ADDRESS OF OPEl:lAiR
P. O. Bx 1734 Anchorage, Alaska 99501
4 LOCATION OF
(Leg 3 Conductor 3) 2391'S & 1379'E fr NW Cor.
Sec. 13, TION, R12W, S.M.
AP1 NU~IEI:LICA.L CODE
API 5-133-20173
6 LEASE DF. SiG1~tAi'i'ION AXD SERIAL NO
ADL 18761 &
ADL 18742
? IF INDIAI~', ALOTI'EE OR TRIBE NAI~tlE
8 L.~IT F.~::~I OR LEASE N.-kME
Mdbil Union State ~)1 &
Granite Point State 18742
9 WEI.,L N'O
~0 FZ, F,J~ A_¥p POOL OR
~ranlue ffolnu, ~l~oole Kenai &
Wildcat
11 SEC , T, R, M (BO~I'OM HOLE
ommcTrv~
Lease line 500' W of NE Cor.
Sec. 13, TION, R12W.
12 PEi~IT NO
.., 69-9
13 REPORT TOTAL DEPTH AT END OF MONTH, CI-L~NG~ IN HOLE SIZE, CASING AND CE2VIENTING JOI~S INCLUDING DEPTH
SET ~ VOLU/VIES USED, P~A~FOI{ATIONS, TESTS A_WI) I~ESULTS, FISHING JOBS, JLrNK IN HOLE A/~D SIDE-TIR. ACKED HOLE
A/ND A_~Y OTHER SIGNIFICAx~T CI~IA2q~ES IN HOL~ CON-DITIONS
February ~ 1969
Opened 12-1/4" hole to 16" to 6007'. While opening 16" hole to 22" the hole was sidetrack.
ed at 1335'.~ An attempt was made to re-enter the old hole with no success. A cement
plug was set from 1280'to 1145'. The hole was re-drilled from 1145' and the old hole
was re-entered at 1368'. While opening hole to 16" the pipe was stuck @ 2250'. Top
of the fish @ 2013'. The fish was washed over and dropped to bottom. Ran to bottom
and recovered fish. Re-opened hole to 16" to 6007'. Cemented 13-3/8" casing at 59,73'
w/750 sax Class G cement, through shoe and with 2200 sax through DV collar at 1992 .
Had cement returns to the surface. Drilled out DV~collar and 13-3/8" shoe @ 5973'
Cleaned out to 6007' but hanging up at 5917'. Wireline collar locator and an impression
block showed that bottom two joints of 13-3/8" casimg had dropped off. A window was
milled in the 13-3/8" casing from 56~28' to 5674'. Set a 172 sax cement plug from 5674'
to 5580'. Polished off plug to 5638', set a dyn~drill and sidetracked the fish at
5638'. Re-drilling 12-1/4" hole.
March 1~ 1969
Re-drilling 12-1/4" hole at 5715'.
14 I hereby cel31fy tl~at the f~regomg ~s true ~ ~
GG'.TIt Area Engineer
SlG~ ~ DA~ March 24, 1969
.o, I ....
~ p rt on t~s [orm ~s reqw ~ [or alendar montk r egarWess o~ the status o[ operaUons, an~ must ~ file~ m ~phcate
w~tb the D~v~s,on of Mines & Minerals by t~e 15t~ of t~e s~cceedmg month, unless other,se ~recte~
l~rm No P--4
REV
STATE OF ALAS~ SUBMr; I~T DUPLICAT~
OIL AND GAS CONSERVATION COMMITTEE
MONTHLY REPORT OF DRILLING
AND WORKOVER OPERATIONS
NAME OF OPERATOR
Mobil Oil Corporation
A]~DRL~SS OF OP]~R.ATOR
P. O. Box 1734 Anchorage, A%aska 99.501
4 LOCATION OF WELL
(LeE 3 Conductor 3) 2391' S & 1379' E from
NW Cur. Sec. 13, TION, R12W, S.M.
AP1 NUA{ER/CAL CODE
API 5-133-20173
LE3%SE DESiGI~A~'qON A\-D SL-'RIAL NO
ADL 18761 &
ADL 18742
IF INDIA]~, ALOT .,t ~.~, O]{ TRIBE NAWIE
-
8 L~'IT FA_RA{ OR LEASE N
6bil. Unio, State/~l ~8742
ranlge colnt Sta
9 WELL NO
MUC # I-1
10 I"L,'7.AL.D A_ND POOL OR WILDCAT
r it Poin Middle Kenai
11 SEC . T , R, M (BO~FOM HOLE
OB.mCrnm)
Lease Line 500' W of NE Cur
Sec. 13, TION, R 12W.
12 PEPdVIIT NO
69-9
13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE,CASING AND CEMENTING JOBS INCLUDING DEPTH
SET ~ VOL~ USED, PERFORATIONS, TESTS ~ RESULTS FISHING JOB~, JUNK IN HOLE AND SIDE-T]{ACKED HOLE
A/XFD ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS
January 1969
Moved in rig & spudded 4:30 AM 1-18-69. Drilled 12-1/4" hole & opened to 22" to
450'. Cemented 18" casing @ 437' w/ 700 sax class G cement including 3% CaC12 in
the last 200 sax. Drilled 12-1/4" hole to 450' to 6007'. Opened 12-1/4" hole to 16"
from 450' to 4419'.
February 1~ 1969
Opening 12-1/4" hole to 16".
DIVI$1ON OF C~ /,,iD GA3
14 I hereby certify that the Eoregomg h~ true ~ correct,
srsw~o (~('-~ ~/~/'~~ .... =~ Area Engineer DAT~ March 24, 1969
NOTE--Report on th~s form s reqmreWfor each calendar month, regardless of the status of operatmns, anO must ~ flle~ in duplicate
w~th the D~wsmn of Mines & Minerals by the 15th of the succeeding month, unless othe~se d~rected
Ilo.
Iqld)tl 0tl
lqobtl
De4r $1r:
The driTlfng :paraft, Fora P-l. for 3~ur IIUC No. 1-1
approu~ on ,Jnur~ 17. I~.
~,emas R. Harsh~11. Jr.
~ctt~ Otrector
FORM SA lB
MEMORANDUM
State of Alaska
TO: r'
FROM:
'fed~ ~, CMef
Division of LJJds
F. d. llmJ~, Mrec~or
Imlr L, bm'ill, OtrJclw
Tiaras L #mshll, ~r.
l)JPAriJBrr oF IATUB~ i~SOJl~
DATE : ~ ,~, 1~1~
SUBJECT=
LMM Limo ¥oll Agrmmmt
erln~m fe4nt fteld
J 1874~ Md ~ 1~B761
'~° ~omer L. Burrell
Director
PedroDenton /~
~o~ Chief, Minerals Section
DATE
SUBJECT
January 27, 1969
Line Well Agreement
Enclosed is a copy of a line well agreement for a well to be located on
or near the lease line between state leases ADL 18761 and 18742. ADL 18761 is
a discovery lease and is presently paying royalty at the 5% rate. The agreement
provides for allocating any production from ~he well equally to both leases. Do
you see any objections by the state as royalty owner to allocation of production
in this manner~
PD :pw
Enclosure
JAN B qa
DIVISION OF OIL AND GAS
ANCI-':OR;~ GE
Mobil Oil Corporation
612 SOUTH FLOWER STREET
LOS ANGELES CALIFORNIA, 90054
P.O. Box 1734
Anchorage, Alaska
January 24, 1969
Director
State of Alaska
Divisior of Lands
344 Sixt Avenue
Anchorag , Alask~ 99501
LINE WELL AG~ EEMENT
GRANITE POIN~f WELL MUC #I-1
D~ ar Sir
W~ are e~ closing
b~tween ] obil Oi
Pctroleu~ Corpor
a~J Skel y Oil C
a~reed t ~ the dr
corner ~ Secti~
line bet ~een St;
is held oy the
the other four t
from the Mob il-b~,, n Granite Point Pla~
operator.
~ree copies o7 a Line ell Agreement dated January 9, 1969,
~orporation, fnion Oi Company of California, Pan American
on, Phillips Petrole~ Company, Sinclair Oil Corporation,
any. This o~greement .~ovides that the a ~ove parties ~ave
lng of a we] L to a b~ tom hole location ~ear the sout!~east
2, T10N, R12'~, S.M., ~ich will be on or near the lea~e
of Alaska le~ses ADL ~761 and ADL 18742. Lease ADL 18761
t two parties named ~ve, and lease ADL 18742 is held by
ies named a~ove. T~ well will be drilled directior~lly
m by Mobil Oil Ccrporation as
We refer you to paga 4 of the agreeme which provides tha production i ~om
this well, and all ~'oyalty paid, wil~ ~e allocated one-hal± to lease ADI 18761
and one-half to lea~e ADL 18742. We ~quest the State of A~aska's appr¢ zal
of this agreement ir sofar as it conce. ~s the manner of payment of the State's
royalty. Upon appr~¢al of this agree~ nt by the State, please return on copy
to US,
For your informatio~ , by a letter dat~ January 8, 1969, we submitted to the
State D~vision of O 1 and Gas a reque for exception to spacing for the above
well.
Sincere ly,
RAG/pjc
Enclosures
Robert A. Gallison
Land Supervisor
ECE, VE
JAN .q 1969
DIVISION OF Oil AND GAS
january 21, 1969
Re: MUC No. 1-1
Mobil Oil Corporation, Operator
NOTE TO THE FILE
The operator's copy of the well permit was picked up at the
Division of Oil and Gas office by a Mobil Oil Corporation representative
on January 17, 1969.
//'
FORM SA lB
MEMORANDUM
TO: 1--
Industrial ~~espectm'
FROM:
Ibis, L. hrre11
Dtrectw'
· lrlsten of 0tl and Gas
State of Alaska
OE~UffW~T OF NATURAL RESQUKC~
DIVI$101t OF OIL AND GAS
DATE :
SUBJECT:
IIR~. 1-1
Hobfl 011 Corporation, Opertt~r
E~clesed ts a c~py ef the approved application t~r pemJt to drill
for tim above cipttamd ~11.
FORM SA I B
MEMORANDUM
TO: j-'
State
of Alaska
DIV/SlOII OF OIL.
FROM:
limit L. IIm'rel I
DATE :
SUBJECT:
ItlC !~. 1-1
Mobil 0ll Corpor&ttou, Operator
[qclesid ire tim ~ application j~r pemtt t~ drill, & lecittom
plat, and &-check 'Jrt tim mamt of $50 for ftllng fee for the abeve
referenced ~Jll.
Mobil Oil Corporation
612 SOUTH FLOWER STREET
LOS ANGELES, CALIFORNIA 90054
NW Producing Area
P. 0. Box 1734
Anchorage, Alaska 99501
January 10, 1969
State of Alaska
Division of Oil & Gas
3001 Porcupine Drive
Anchorage, Alaska 99503
Attention: Mr. T. R. Marshall, Jr.
Gentlemen:
Enclosed are three copies of our application to drill well Granite Point MUC
#I-1 (State Form P-l), three location plats and our draft for $50.00.
This well will be spudded after receipt of your approval.
Attachments
Very truly yours,
C. C. Woodruff
Area Engineer
revision o~ o~t ~o oas
ANC~~
Form
REV 9-30--6'I
i
SUBMIT IN TRI~ .TE
(Other ~n~truct~ons ~n
reverse side)
STATE OF ALASKA
OIL AND GAS CONSERVATION COMMITTEE
APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK
la TYP~ OF WORK
DRILL J~ DEEPEN []
b. TYPEOF W~LL
om ~ o~ ~ Wildcat ~ ~
WELL WELL 0THOR ZONE
2 ~A~ OF OP~TOR
~ob~l O~1 Corporation
3 ADD~ ~ OPhiR
P. O. Box 173~ ~nchorage, ~lasks 99501
PLUG BACK [-]
MLLTIPLE ~
ZONE
4 LOCATION
Atsurface °~3v~S & 1379'E fr NW Cot. Sec. 13, TION, R12W, S.M.
(Leg 3 Conductor 3)
At proposed prod zone
Approx. 500' W of the NE Corner of Sec. 13 TION, R12W, S.M.
13 DISTANCE IN MILES AND DIRECTION F-~OM NEAREST TOWN OR POST OFFICe*
Approx. 10 miles South o,f Tyonek
·
14 BOND INFOPa~A:UON Pacific Indemnity Co.
TYPE 0il & GaS s,retsand/orNo #243305 (Expires 9/18/71)
15 DISTANCE FROM PROPOSED* ~-- 1 .... 1..:- A c 16 NO. OF ACRF~ IN LEASE
LOCATION TO NEAREST vtt m ~ c,..J ~ ~=~ m m ttl=~ Og
1
PROPERTY OR LEASE LINE, FT 5780' from State 5089 in ADL 18761
(Also to nearest drlg, umt, if any)~lnieased propertv 5060 in ADL 18742
18 DISTANCE FROM PROPOSED LOCi'lION* ' - 119 PROPOSED DEPTI-I
TO NEAREST WELL DRILLING, COMPLETE~, '[ 147 00 ' V, D,
OR APPLIED FOR, FT 1850' 16000 ' M.D.
21 ELEVATIONS (Show whether DF, RT, CR, etc )
106~ above lqLLW (K.B'), .
23 PT~OPOSED CASING AND CmENTING PROGRA/VI
AP1 50-133-20173
6 LF~kSE
D~9~qTI%N AND SgI~AL NO
ADL
ADL 18742
IF ~. ~~ OR ~ N~
8 LTNIT FAR1VI OR LEASE N/LIVIE
Mobil-Union State #1 &
Granite Point State 18742
WELL NO
MUC #I-1
10 FIKLD AND POOL, OR WILDCAT
r it Point & Middle Kenai
11 SEC , T, R, M, (BOTTOM
HOLE OBJECTIVE)
Lease line 500' West of ~E'
Corner Sec. 13~ TION~ Ri~W
A~o,,~t $100,000. O0
8O
117 NO ACRES ASSIGNED
TO THiS WELL
20 ROTARY OR CABLE TOOLS
Rot a ry
22 APPROX DATE WORK WILL START*
February 1, 1969
,,
SIZE OF HOLE SIZE OF CASING/ WEIGHT PER FOOT GRAD~ SETTiNG DEPTH QUANTITT OF CF. MENT
22" 18" 70.59 I B 400'+ Circulate to surface
16" 13-3 ~8' 61~0 Jr55 6000'+ Stage ,,,to Surface
12-1/4' 9-5/~ 40 & ~+3'.5 ,,lq,-80,~S~, !Z40,0'+~' M.iRimu~-500' above pr~dueing.Zo~
8-1/2' 7" 32. Pll0 , 16000'+ Suffi,cient to fill to liner top
/
The well will be directionally drilled approximately 4200', N55°E from the surface
location to total depth in order to reach the objective from the permanent platform.
B.O.P. Program 400" to 6000': 20-3/8" Hydril "MSP 2000 psi WOG
6000' to T.D.: 13-3/8" Hydril "GK" 5000 psi WOG
13-3/8" Cameron "U" triple hydraulic 5000 WOG
JAN 1 0 1969
If ._I~_.po.sal i,s to deepen or plug l:mck g,ve data on presen?pONDjv~ ~ OiL A"~d~A
pr%gs~ ~%%d~,v~ ~ If%roOp~Y~ d~,51 o~ d~n a~ec~_o~lly, g,ve pe~men~ ~ on ~bs~ace ~t~~ ~d
~ue venal dep~ Give blowout preventer program
24 I hereby 7~'~hat the~F°~;e~°mg ,CMl'rue and Cqr"ct
(Th~ space for 8~te offi~
S~L~ ~D CO~ CroPS E~U~ ~ ~U~
~ Y~ ~NO
APPROV~BV_-- ..... TI~. Director
*See Inductions On Reveme Side
Area Engi~neer
January 17. lg6g
~A~ January 17.~ lg69
(
STATE OF ALASKA
DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL AND GAS
Alaska Oil and Gas Conservation Committee
3001 Porcupine Drive
Anchorage, A1 aska 99504
Re: Emergency Order - January 17, 1969
Conservation File No. 70
Mobil Oil Corporation MUC #l-l, Granite Point Field
Bottomhole target area covers portions of NE¼ of Section 13,
SE¼ of Section 12, TION, R12W. S.M., the Sk~ of Section 7,
or the Nk~ of Section 18, TION, RllW, S.M.
Mobil Oil Corporation petitioned the Alaska Oil and Gas Conservation
Committee on January 8, 1969, for an order excepting the referenced well
location from the footage spacing requirements of Section 2061, Title ll,
AAC. On January 17, 1969, said corporation requested an emergency order
to permit the drilling of the referenced well. The affected operators
have joined Mobil Oil Corporation in the request for an emergency order.
An emergency order is hereby granted pursuant to and in accordance
with Section 2012 of the Alaska Oil and Gas Conservation Regulations
permitting the drilling of the referenced well. This emergency order
expires January 31, 1969.
~Thomas R. Marshall, Jr.
Executive Secretary
35
2
13
11
&N AM
,'~kb.State
:44-11
6
7
Location Plat MUC I-1
1" = 2000'
'~/~ 13
!4-1~,/
RECEIVED
~ ~" ~- 0 ~%.~ 18
IIVISIONOF OIL AND OAS
^Nc _H~_o~__L _ '
; Mobil Oil Corporation
9JPROPOSED ! LOCATIO~
· WELL 1 f.~UC I-1 I
MOBIL-UNION ADL 18761 ~~~[~_ . . U
31-13 ~ ~