Alaska Logo
Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
Loading...
HomeMy WebLinkAbout169-009STATE OF ALASKA ,LASKA OIL AND GAS CONSERVATION G. ..MISSION REPORT OF SUNDRY WELL OPERATIONS JUL 2 9 2019 €' rte, f> r-. Y-- 1. Operations Abandon LJ Plug Perforations L Fracture Stimulate L Pull Tubing Li Operations shutdown Li Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑� Alter Casing ❑ Change Approved Program ❑ Plug for Reddll ❑ Perforate New Pool ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Oil Safe AR Q 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska, LLC Development ❑ Exploratory ❑ Stratigraphic ❑ Service 169-009 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-20173-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: � ADL0018761 /�'��GFS/�%`f'L /� ���� �% Granite Pt St 18761 MUCI-1 9. Logs (List ogs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Granite Point Field / Middle Kenai Oil Pool 11. Present Well Condition Summary: Total Depth measured 15,715 feet Plugs measured N/A feet true vertical 14,431 feet Junk measured N/A feet Effective Depth measured 11,219 feet Packer measured 10,158 feet true vertical 10,066 feet true vertical 9,035 feet Casing Length Size MD TVD Burst Collapse Conductor 229' 33" 229' 229' Structural 381' 24" 381' 381' Structural 437' 18" 437' 437' Surface 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi Intermediate 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi Production 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi Liner 1,130' 5" 11,222' 10,069' 9,910 psi 10,490 psi Perforation depth Measured depth 10,535 - 11,216 feet True Vertical depth 9,402 - 10,064 feet 3-1/2" 9.2# / N-80 10,078 (MD) 8,958 (TVD) Tubing (size, grade, measured and true vertical depth) 2-3/8" 4.7# / N-80 10,224 (MD) 9,099 (TVD) 10,158 (MD) Packers and SSSV (type, measured and true vertical depth) Otis WB Perm Pkr 9,035 (TVD) SSSV: N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A - well pressured up and wouldn't take fluid Treatment descriptions including volumes used and final pressure: 26 gallons of Safe Acid, final pressure 750# 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 0 0 578 1 0 Subsequent to operation: 0 0 0 633 1 326 14. Attachments (required ver 20 AAc 25.070, 25.071, 825.283) 15. Well Class after work: Daily Report of Well Operations 21 Exploratory ❑ Development ❑ Service Stratigraphic ❑ Copies of Logs and Surveys Run ❑ 16. Well Status after work: Oil Gas WDSPL Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ 0 WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 319-304 Authorized Name: Stan W. Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dmarlOWe(Qit111COfD. pro Authorized Signature: f l,. Date: Zr') Contact Phone: (907) 283-1329 uLA rJ Form 1004 Revised 4/2017 Y' if `! -Sub RBDMS�UL 312019 mit orriginal Only n19 ,� K mre Alaska, LLC RKB to tubing hanger= 38', RKB to MLLW =106 PBTD: 11,219' TD. 15,715' SCHEMATIC CASING DETAIL Granite Point Field Well: Granite Pt St 18761 MUCI-1 Last Completed: 11/27/1984 PTD: 169-009 API: 50-733-20173-00 Size Wt Grade I Conn ID Top Btm 33" 38' Top (TVD) Driven OCT Tubing Hanger Surf 229' 24" 157.5 B XA Sleeve 22.75 Surf 381' 18" 70.5# X -Over 3-1/2" x 2-3/8" Vetco Thread 10,158' Surf 437' 13-3/8" 61# 1-55 Butt 12.515 Surf 5,628' (TOW) Btm of Mule shoe 40# N-80 Butt& LTC 8.835 Surf 4,963' 9-5/8" 43.5# N-80 LTC 8.755 4,963' 7,259' 10,224' 47# S-95 ST&C 8.681 7,259' 11,257' 5" 18# N-80 B2t/FL4S 4.276 10,092' 11,222' 11,186' 23# 1 N-80 Butt 6.366 Surf 6,693' 7" 26# N-80 Butt 6.276 6,693' 9,186' 29# N-80 X -Line 6.184 9,186' 11,234' TUBING DETAIL 3-1/2" 9.2# N-80 Butt 2.992 Surf 10,078' 2-3/8" 4.7# N-80 Butt 1.995 10,078' 10,224' JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item 'one 38' 38' Top (TVD) Btrn (TVD) OCT Tubing Hanger 1 ±10,047' ±8,991' 10,635' 9,402' XA Sleeve 100' 10,078' 81958' 10,660' 10,705' X -Over 3-1/2" x 2-3/8" 2 10,158' 9,035' 2.55 4.11 Otis "WB" Perm Packer w/Seal Bore Ext 3 10,176' 9,053' 1.94 2.52 Btm of Mule shoe 4 10,178' 9,055' 1.994 3.875 X -Over 3-1/2" x 2-3/8" 5 10,192 9,068 1.875 3.09 Otis "X" Nipple 6 10,224' 9,099' 2.00 4.00 WLREG Updated By: JLL 05/24/19 PERFORATION DETAIL 'one Top (MD) Btm (MD) Top (TVD) Btrn (TVD) FT Date Status Zone 10,535' 10,635' 9,402' 9,499' 100' Nov -84 Zone 10,660' 10,705' 9,524' 9,567' 45' Nov -84 Zone 10,735' 10,785' 9,596' 9,645' 50, Nov -84 Zone 10,815' 10,825' 9,674' 9,684' 30' Nov -84 Zone 10,841' 10,851' 9,699' 9,709' 10' Nov -84 Zone 11,050' 11,075' 9,902' 9,927' 25' Nov -84 Zone 11,100' 11,145' 9,951' 9,995' 45' Nov -84 Zone 11,186' 11,216' 10,034' 10,064' 30' Nov -84 Updated By: JLL 05/24/19 Hilcorp Alaska, LLC Well Operations Summary Well Name Rig API Number Well Permit Number Start Date End Date Granite Pt St 18761 MUCI-1 Slickline I SO -733-20173-00-00 1 169-009 7/4/19 1 7/5/19 Daily Operations: 07/04/19 - Thursday Spot 2 totes of Safe acid and rig up hoses to top of tree utilizing the vacuum on the well to feed the acid into MUCI-1. Open valve on tote to well, approx. 120 gal pulled into well in 6 minutes then vacuum is lost. Shut-in well. Open well reestablish flow, allow well to take acid for 1 hour, only takes 15 gal. Shut-in well. Rig down hoses. Rig up centrifugal pump and begin pumping into well. Well takes 5 gal and pressures up to pump max of 30psi in 30 minutes. Shut-in well. Rig up high pressure chemical pump and begin pumping into well. Pressure increases from 30psi to 750psi within the first hour and only takes approx. 1 gal acid. Continue to pump overnight. 07/05/19 - Friday Well shut-in to allow pressure to decrease 560# @ 20:00. THE STATE °fALASKA GOVERNOR MIKE DUNLEAVY Stan W. Golis Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Alaska Oil and Gas Conservation Commission 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www, aogcc.oioska.gov Re: Granite Point Field, Middle Kenai Oil Pool, Granite Pt St 18761 MUCI-1 Permit to Drill Number: 169-009 Sundry Number: 319-304 Dear Mr. Golis: Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Daniel T. Seamount, Jr. Commissioner -1 DATED this � day of July, 2019. RBDMS�6/JUL Q Z 200 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 9n AA('. 95 9Rn REEIVIE JUN 2 0 ti019 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ AC)GGQhutd.wnE1 Suspend ❑ Perforate ❑ Other Stimulate ❑Q Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Oil Safe AR Q 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory ❑ Development ❑ Stratigraphic ❑ Service Q 169-009 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-20173-00-00 r 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No ❑± ' Granite Pt St 18761 MUCI-1 r 9. Property Designation (Lease Numherl' 10. Field/Pool(s): ADL0018761 4.p L— i t:J� 771 A 'P/' r Granite Point Field /Middle Kenai Oil Pool 11. / PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 15,715 14,431 11,219 10,066 1,613 psi N/A WA Casing Length Size MD TVD Burst Collapse Conductor 229' 33" 229' 229' Structural 381' 24" 381' 381' Structural 437' 18" 437' 437' Surface 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi Intermediate 11,257' 9-5/8" 1 11,257' 10,103' 5,750 psi 3,090 psi Production 11,234' 7" 11,234' 110,081' 6,340 psi 3,830 psi Liner 1,130' 5" 11,222' 1 10,069' 9,910 psi 10,490 psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10,535 - 11,216 9,402 - 10,064 3-1/2" & 2-3/8" 9.2# / N-80 & 4.7# N-80 10,078 & 10,224 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): Otis "WB" Perm Packer & N/A 10,158 (MD) 19,035 (TVD) & NA 12. Attachments: Proposal Summary 0 Wellbore schematic Q 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Strati ra hic ❑ g p ❑ Development ❑ Service 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 7/5/2019 OIL ❑ WINJ Q WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Dale: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W. Golfs Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dmarlowe hilcor .Com u Contact Phone: (907) 283-1329 � � Authorized signature: Date: L 7,L)I \ COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number: n l O !J� Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: RBDMS4A/JUL 0 21019 Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No Subsequent Form Required: / h [� APPROVED BY 7 I Approved by: COMMISSIONER THE COMMISSION Date: �i ,�/{�•" e9121 ov'Zif ` �1 \ V A SubmH Form ane Form lt>pfOs Revisetl ! 0 Approved application is al 1 fi`T n/I rine ate of approval. Attachments in Duplicate V ���/r ':PIZ$ 4;l*E9 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25 280 JUN 2 0 6019 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repair Well ❑ACM;ia hutdown ❑ Suspend ❑ Perforate ❑ Other Stimulate Q Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other: Oil Safe AR ❑D 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number: Hilcorp Alaska, LLC Exploratory ❑ Development ❑ Strati ra hic Service g p ❑ 169-009 ' 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number: Anchorage, AK 99503 50-733-20173-00-00 r 7. If perforating: 8. Well Name and Number: What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No r Granite Pt St 18761 MUCI-1 9. Property Designation (Lease Number): 10. Field/Pool(s): , ADL0018761 = lj- CSw.� Granite Point Field / Middle Kenai Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 15,715 14,431 11,219 10,066 1,613 psi N/A N/A Casing Length Size MD TVD Burst Collapse Conductor 229' 33" 229' 229' Structural 381' 24" 381' 381' Structural 437' 18" 437' 437' Surface 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi Intermediate 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi Production 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi Liner 1,130' 15" 11,222' 10,069' 9,910 psi 10,490 psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10,535 - 11,216 9,402 - 10,064 3-1 /2" & 2-3/8" 9.2# / N-80 & 4.7# N-80 10,078 & 10,224 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): Otis "WB" Penn Packer & N/A 10,158 (MD) 19,035 (TVD) & NA 12. Attachments: Proposal Summary Q Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑ Service Q 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 7/5/2019 OIL ❑ WINJ Q WDSPL ❑ Suspended ❑ GAS p WAG ❑ GSTOR ❑ SPLUG ❑ 16. Verbal Approval: Date: Commission Representative: GINJ ❑ Op Shutdown ❑ Abandoned ❑ 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W. Golis Contact Name: Dan Marlowe Authorized Title: Operations Manager Contact Email: dMarlOWe hllcor .COM Contact Phone: (907) 283-1329 6 &.)& Authorized Signature: Date: &y0 COMMISSION USE ONLY I Conditions of approval: Notify Commission so f hat a representative may witness Sundry Number: 3ou Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test ❑ Location Clearance ❑ Other: RBDMS�k/JUL 0 2 2019 Post Initial Injection MIT Req'd? Yes ❑ No ❑ Spacing Exception Required? Yes ❑ No Subsequent Form Required: / O u APPROVED BYJ I I Approved by: COMMISSIONER THE COMMISSION Date: Form 3 visee /1/ o /��t [app 4 Approved application is /'� al fl 1 e ate of approval. Attachments in Duplicate fsN Submit Form and 1 V '�W-Joi'M$ 441.1 ff IGl.q Alaska, LLC Well Name: Current Status: Estimated Start Date: Granite Point St 18761 API Number: MUCI-1 Well Prognosis 50-733-20173-00 #3 Reg. Hpproval Req'd? 403 Date Reg. Approval Rec'vd: Regulatory Contact: First Call Engineer: Juanita Lovett (8332) Permit to Drill Number: 169-009 Second Call Engineer: Dan Marlowe (907) 283-1329 (0) Stan Golis (907) 398-9904 (M) (907)777-8356(0) (281)450-3071(M) Current Bottom Hole Pressure: Maximum Expected BHP: 2,553 psi @ 9,042' TVD 0.272 Ibs/ft (5.22 ppg) based on 2013 SIBHP 2,553 psi @ 9,042' TVD 0.272 lbs/ft (5.22 ppg) based on 2013 SIBHP Maximum Potential Surface Pressure: 1,613 psi Using 0.1 psi/ft gradient 20AAC25.280(b)(4) Brief Well Summary The MUCI-01 is currently injecting into the Tyonek B & C. This project will stimulate the well in an attempt to remediate suspected Iron Sulfide buildup. Procedure, 1. MIRU chemical transfer equipment. 2. Isolate well from injection header and ensure it is bled off. 3. Transfer±550 gallons Oilsafe AR (synthetic acid) into well while it is bled off. Note — Well goes on vacuum when not on injection. Chemical will be siphoned into the tubing through a check valve while the well is offline. 4. Flush and rig down chemical transfer equipment. 5. Re -align well to normal injection system and displace with ±94 bbls FIW 6. Shut down pump and soak for±72 hours. 7. Resume normal injection. Attachments: I. Well Schematic Current 2. Fluid Flow Diagrams 3. OilsafeAR—Technical Data Sheet ff SCHEMATIC Hilcsru Alaska, LLC RKB to tubing hanger -39, RKB to MLLW =106 PBTD: 11,219' TD: 15,715' Granite Point Field Well: Granite Pt St 18761 MUCI-1 Last Completed: 11/27/1984 PTD: 169-009 am• Kn-712_lnl�u nn CASING DETAIL Size Wt Grade Conn ID Top Btm 33" 38' Top (TVD) Driven OCTTubing Hanger Surf 229' 24" 157.5 B XA Sleeve 22.75 Surf 381' 18" 70.5# X -Over 3-1/2" x 2-3/8" Vetco Thread 10,158' Surf 437' 13-3/8" 61# J-55 Butt 12.515 Surf 5,628' (TOW) --f- Ishoe 40# N-80 Butt & LTC 8.835 Surf 4,963' 9-5/8" 43.5# N-80 LTC 8.755 4,963' 7,259' 10,224' 47# S-95 8RT & ST&C 8.681 7,259' 11,257' 5" 18# N-80 But/FL4S 4.276 10,092' 11,222' 11,186' 23# N-80 Butt 6.366 Surf 6,693' 7" 26# N-80 Butt 6.276 6,693' 1 9,186' 29# N-80 X -Line 6.184 9,186' 11,234' TUBING DETAIL JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item to 38' 38' Top (TVD) Btm (TVD) OCTTubing Hanger 1 ±10,047' ±8,991� 10,635' 9,402' XA Sleeve 100' 10,078' 8,958' 10,660' 10,705' X -Over 3-1/2" x 2-3/8" 2 10,158' 9,035' 2.55 4.11 Otis "WB" Perm Packerw/Seal Bore aElt 3 10,176' 9,053' 1.94 2.52 --f- Ishoe 4 10,178' 9,055' 1.994 3.875 X -Over 3-1/2" x 2-3/8" 5 10,192 9,068 1 1.875 1 3.09 1 Otis "X" Nipple 6 10,224' 1 9,099' 1 2.00 1 4.00 1 WLREG Updated BY: JLL 05/24/19 PERFORATION DETAIL to Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status ne 10,535' 10,635' 9,402' 9,499' 100' Nov -84 ne 10,660' 10,705' 9,524' 9,567' 45' Nov -84 ne 10,735' 10,785' 9,596' 9,645' 50• Nov -84 ne 10,815' 10,825 9,674' 9,684' 10' Nov -84 ne 10,841' 10,851 9,699' 9,709' 10' Nov -84 ne 11,050' 11,075' 9,902' 9,927' 25' Nov -84 ne 11,100' 11,145' 9,951' 9,995' 45' Nov -84 ie 11,186' 11,216' 10,034' 10,064' 30' Nov -84 Updated BY: JLL 05/24/19 �� o � � �� Y �� � � �g U yy W 1 j/ �' I[li �� I�I%I W tt Y 89 k d a i ff p. 4 Y 08 Safe ARS is a safe yet functional replacement for traditional hydrochloric acid treatments and other commonly used OIM&ld acid treatment•. file non-reguleled by US DOT, Canadian TDO and carries a triple aero huardoua material. Wormation system °cora. 0118sfe ARM blodegrade. inl0dnysorle.. India approvedby the USBPAaaa Dealonedfor the Environment roduci O r i If rdO B .. -• .. .yea FEATURES AND BENEFITS, • An eseellamaaolaeterface, apertheadlmlmenla,InJeallMwalDmddb- pvul wdla end s=olo auks Requlru=orgaNa std add lllov to help retard reavllen ale. RlanMrd formula Ndudea =deal=t mdtle-mub0lenydem Relrylre. Ra ban aoninl agent atldlllon for mon apytivallov EPA D2formuL; Dlatlayndable M to da7a or tau; ap m,vu, for dhacl db- -huge;mad. Mlh Cleangredlenle Intl DM hIpedesta approvedby the EPA • B•fa on matmelab, plping and pumphn equlpmenl • Non W.I.; non fuming mnmulagenly; uo VOC'e No aamorthry aonlolumenl re0nod a. per 0hepler Ba-IsIF.AA. I• 611Mnala (ovlanb An..ubml efielvs torwork-everpn)ecU, bullhead Inalme u, andeemeninmetllatlon • Requires ala addlllavivorroaivn lMibltaglop &r mwl appllaauhs. • tea%bledegndable, wldfraa -I'd m1Yn111 IYNblled DISSOLVING PROPERTIES ACID TYPE %CaC0. Oil safe ARM 60% solution 98,76% OE Safe ARM 30% Solution 64,00 7 %HCI 49.40% 18% RCI 07.39°/11 7%HCI+100 gp1 of 08%Acelic Acid 78.08% 15% HCI+ 100 gpi of 80% Arctic Acid 87.07% 10% Acetic Anld 01.00%. 18%AcellcAcid 03.09% 8arh laaeneve aaa WM IsdMlh 1 abla b•harmel." Is ..dlneam,ot aeNemaM Wmaad b rvakf11rl M al IeQT. P . u em eSafe An formula ditto= or corrosion inhibitors undermost conditions. DIRECTIONS FOR USE, Recommended Dilution Rates: 30.100% with HIO based on the a"edty of the build-up and the reaction rate required for IDs 'No"'; Vu bale RAI)concentrate conlahls Iron control agents and de-mulsifievs. No organic acid m corrosion inhibitors ars required due to the power of ompatented SynlechM. A Wiest ratio for an acid frac Is one part OB Safe ARM end one PuH80- BlenNng rafios may very based on specWo sppllcatlon. andreeommendations from your consultants at Heartland Energy Group, Ltd. STORAGE AND HANDLING, RM OUSafe Abas storage life ofbetler than one year. Keep container closed when not in use. As with all chemlcalproducts andmaterials. lake care ae mwhareyouslore them. Safely 914-3" are augga.tedfor use when handling Ud. product. No special gloves orprotective equipment are required when handling lN.product. wnenpumpmg this product, It 1s strongly recommended to use mMufactwer approved hose couplings or fillings. DO NOT USE ALUMW MF7TTINO.S.310Stdnlesa Steel,polypropylene, Polyethylene are recommended. PACKAGING: In bulk tanker trucks from the loallerpackaging quantities are available STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION REPORT OF SUNDRY WELL OPERATIONS RECEIVE® JAN 0 0 2019 1. Operations Abandon LJ Plug Perforations LJ Fracture Stimulate LJ Pull Tubing LJ Operatiorfs�s Performed: Suspend ❑ Perforate ❑ Other Stimulate ❑ Alter Casing ❑ Change A.. ❑ Plug for Redrill ❑ Perforate New Pool 96A ❑ Repair Well ❑ Re-enter Susp Well ❑ Other: Variance to 20AAC 25.265M ❑� 2. Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: Hilcorp Alaska, LLC Development ❑ Fxploratory❑ 169-009 3. Address: 3800 Centerpoint Drive, Suite 1400 Stratigraphic ❑ Service 0 6. API Number: Anchorage, AK 99503 50-733-20173-00-00 7. Property Designation (Lease Number): 8. Well Name and Number: ADL0018761 Granite Pt St 18761 MUCI-1 9. Logs (List logs and submit electronic and printed data per 20AAC25.071): 10. Field/Pool(s): N/A Granite Point Field / Middle Kenai Oil Pool 11. Present Well Condition Summary: Total Depth measured 15,715 feet Plugs measured N/A feet true vertical 14,431 feet Junk measured N/A feet Effective Depth measured 11,219 feet Packer measured 10,158 feet true vertical 10,066 feet true vertical 9,035 feet Casing Length Size MD TVD Burst Collapse Structural 381' 24" 381' 381' Surface 437' 18" 437' 437' Intermediate 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi Production 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi Liner 1,130' 5" 11,222' 10,069' 9,910 psi 10,490 psi Liner 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi Perforation depth Measured depth 10,535 -11,216 feet True Vertical depth 9,402 - 10,064 feet 3-1/2" 9.2# / N-80 10,187 (MD) 9,063 (TVD) Tubing (size, grade, measured and true vertical depth) 2-3/8" 4.7# / N-80 10,224 (MD) 9,099 (TVD) 10,158 (MD) Packers and SSSV (type, measured and true vertical depth) Otis WB Perm Pkr 9,035 (TVD) SSSV: N/A 12. Stimulation or cement squeeze summary: Intervals treated (measured): N/A Treatment descriptions including volumes used and final pressure: N/A 13. Representative Daily Average Production or Injection Data Oil -Bbl Gas-Mcf Water -Bbl Casing Pressure Tubing Pressure Prior to well operation:0 0 0 502 7 Subsequent to operation: 0 0 291 474 3208 14. Attachments (required per 20 AAC 25.070, 25.071, s 25.283) 15. Well Class after work: Daily Report of Well Operations ❑ Exploratory ❑ Development ❑ Service ❑Q Stratigraphic ❑ Copies of Logs and Surveys Run El i6. Well Status after work: Oil ❑ Gas WDSPL ❑ Printed and Electronic Fracture Stimulation Data ❑ GSTOR ❑ WINJ ❑✓ WAG ❑ GINJ ❑ SUSP ❑ SPLUG ❑ 17. 1 hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 318-278 Authorized Name: Stan W. Golis Contact Name: Joe Kaiser Authorized Title: Operations Manager Contact Email: lal5er hiICOfD COm Authorized Signature: Date: Q Contact Phone: (907) 777-8393 Form 101404 Revised 4/2017 / /�RBDM I� JAN 0 9 2019 Submit Odginal Only ff Hilcy Alaska, LLC RKB t0 Tubir19Rarger= 39, RKB to MLLW =106' Granite Point Field Well: Granite Pt St 18761 MUCI-1 SCHEMATIC Last Completed: 11/27/1984 PTD: 169-009 API: 50-733-20173-00 CASING DETAIL 1 UtMb DETAIL JEWELRY DETAIL PERFORATION DETAIL Zone Top Btm Top Bt (MD) (MD) (TVD) (TVD) FT Date Status B Zone 10,535' 10,635' 9,402' 9,499' 100' Nov -84 B Zone 10,660' 10,705' 9,524' 9,567' 45' Nov -S4 B Zone 10,735' 10,785' 91596' 9,645' 50' 8 Zone 10,815' 10,825' 9,674' 9,684' Nov -84 10' Nov -84 B Zone 10,841' 10,851' 9,699' 9,709' 10' Nov -84 C Zone 11,050' 11,075' 9,902' 9,927' 25' Nov -84 C Zone 11,100' 11,145' 9,951' 9,995' 45' Nov -84 C Zone 11,186' 11,216' 10,034' 10,064' an, a..., e. PBM. 11,219' TD: 15,715' Updated BY: JUL 06/19/18 D STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanical Integrity Test Submitto: IM10991IIAleIAQGCCInspeonslssaitiM, op, pboebebr kslb la k- uw OPERATOR: Hilmry Naska llc FIELD/UNIT/PAD: Gueete Point Feld Granite Point Unit/Granite Point Pla6Pml DATE: 1=7118 OPERATOR REP: Marty Askin AOGCC REP: c—c,,... M1' 11 eifil I k - --- ssures: rra[est Initial tS Mn. 30 Min. 45 Min. BD Min. PTD 18&009 Tyye lnj W TUGng 2814 2838 2816 2811 Pa xo. Nn Type TBS[ P THE INJ CNet W = Weler G=Gas S=Slurry 1=btluMUl WsaM ' N=NN lnlecting TYPE TEST CN- INTERVAL CWm P=Pre.. Ten 1=Intel Tet 0="her l.fteIn Nobs) 4=Fwryear C,. V=RaquirtEp Varian. o=otller (III in nou, Fpml 10128 (Revised 01201 MIICI x113 -T3%0 MIT Result CNea P=Paas F=Fail Test psi - -- 2258 BBL ---_ •^ 2bbls OA •w 200 e4uR 2401 2398 Imetal IRetum 370 3]0 370 Result P Nntee: Opp Opel OmugMhe whole test The following A10 -MOW "Yell Pressures: Pretest Initial 15 Min. 30 Mn. 45 Min. BD Min. PTD Type Inj Tubing Pacer TVD BBL Pune W Type Test Test psi BBL Return Oq IrIBrval Wendt N2L.A: Well Pressures: Pretest Initial 15 Min. 30 Min. 45 Min. BO Min. PTD Type Inj Tubing Parker TVD BBL Pump a Type Test Test psi BBL Return OA Interval Result Ngo: Well Pressures: Pretest Insist 15 Min. 30 Min. 45 Min. 60 Min, PTD Type lnj Tubing PerkerWD BBL Pump Iq Type Test Test Psi 88L Res OA In nh. Result N43ta: Well Pressures: Pretest Initial 15 Min, 30 MN, qS Min, 80 Min. PTD Typelnj Tubing Packer ND BBL Pump IA Type Test Test Psi BBL ReWrn OA erval Resuk NMae: Well Pressures: Pretest Intal 15 Min. 30 Min. 45 Min. 80 Min. PTD Type IN Tubing Parker TVD BBL Puny k4 Type Test Test psi BBL Return OA Interval Result NOtes: Well Pressures: Pretest Initial 15 Min. 3D Min. 45 Min. 60 Min. PTD Type In Tubing Parker TVD BBL Pump N Type Test Test psi BBL RetumOA Interval Result Nple_s: Well Pressures: Pretest Initial 15 Min. 30 Mm. 45 Min. 130 Mn. PTD Type Inj Tubing PackerTVO BBL Pump IA Type Test Test psi BBL Rehxn OA erva Reauh N4Isa: THE INJ CNet W = Weler G=Gas S=Slurry 1=btluMUl WsaM ' N=NN lnlecting TYPE TEST CN- INTERVAL CWm P=Pre.. Ten 1=Intel Tet 0="her l.fteIn Nobs) 4=Fwryear C,. V=RaquirtEp Varian. o=otller (III in nou, Fpml 10128 (Revised 01201 MIICI x113 -T3%0 MIT Result CNea P=Paas F=Fail From: Joe Kaiser Sent: Wednesday, January 02, 2019 9:35 AM To:'Schwartz, Guy L (DOA)' <guy.schwartz@alaska.gov> Subject: PTD: 169-009 Sundry: 318-278 - Subsequent Report Question Mr. Schwartz: This is in regards to Sundry 318-278 and the subsequent report filing Hilcorp passed a state witnessed post-injection MIT on 12-7-2018. We will continue to operate this well without a SVS system as requested in the sundry. It is not a normal well work sundry request. Meaning no well work was completed that produces a change to a well schematic or well operations summary report. Therefore, I am unclear as to what AOGCC would like attached with the 10-404 report. I can attached the post-injection MIT report with the 10-404. Is that sufficient? I am requesting a clarification, so the report may be submitted. I appreciate your time regarding this matter Joe Kaiser CIO Operations Engineer ikoiserit hilcoro com 907-777-8393 Office 907-952-8897 Cell Well Name GRANITE PT ST 18761 MUCI-1 API Well Number 50-733-20173-00-00 Inspector Name: Guy Cook is Insp Num: mitGDC181217172915 MEMORANDUM State of Alaska Packer Depth Pretest Initial Alaska Oil and Gas Conservation Commission ell DATE: Wednesday, December 19, 2018 TO: Jim Regg P.I. SupervisorC' ol oc l I o R( SUBJECT: Mechanical Integrity Tests HILCORP ALASKA LLC Tubing, MUCI-1 FROM: Guy Cook GRANITE PT ST 18761 MUCI-1 Petroleum Inspector Sre: Inspector 1690090 Reviewed By: SPT P.I. Supry NON -CONFIDENTIAL Comm Well Name GRANITE PT ST 18761 MUCI-1 API Well Number 50-733-20173-00-00 Inspector Name: Guy Cook Permit Number: 169-009-0 Inspection Date: 12/7/2018 , Insp Num: mitGDC181217172915 Rel Insp Num: Packer Depth Pretest Initial 15 Min 30 Min 45 Min 60 Min ell MUCI-1 Type Inj w .1T 9028 Tubing, 2814 2838 zsls - zsn [PTD 1690090 Type Test SPT ITest psi 2257 IA 400 2404 2401 - 2399 ' BBL Pumped: 1 2 BBL Returned: 2 OA 200 370 370 370 Interval INITAL P/F P Notes: A small air actuated pump and an open top 55 gallon barrel were used for testing. There was an OOA as well on this well. The pressure was at zero psi. during the entire testing process. -- "WD JAN 0 3 2019 Wednesday, December 19, 2018 Page 1 of 1 THE sra�r 'ALASKA GOVERNOR BILL WALKER Stan Golis %ARKV J a G 3 � U 18 Operations Manager Hilcorp Alaska, LLC 3800 Centerpoint Drive, Suite 1400 Anchorage, AK 99503 Alaska Oil and Gas 333 West Seventh Avenue Anchorage, Alaska 99501-3572 Main: 907.279.1433 Fax: 907.276.7542 www.00gcc.alaska.gov Re: Granite Point Field, Middle Kenai Oil Pool, Granite Pt. St. 18761 MUCI-1 Permit to Drill Number: 169-009 Sundry Number: 318-278 Dear Mr. Golis: Enclosed is the approved application for the sundry approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the AOGCC grants for good cause shown, a person affected by it may file with the AOGCC an application for reconsideration. A request for reconsideration is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. Sincerely, Hollis S. French Chair S� DATED this ' day of July, 2018. RBDMS�D AUG 0 12018 • Schwartz, Guy L (DOA) From: Joe Kaiser <jkaiser@hilcorp.com> Sent: Monday, July 30, 2018 11:40 AM To: Schwartz, Guy L (DOA) Cc: Rixse, Melvin G (DOA) Subject: RE: GPS 18761 MUCI-1 (safety valve waiver) Attachments: GPP MUCI #1 current wellhead drawing.docx, GPP Water Flood PIDs - Proposed AOGCC.pdf Follow Up Flag: Follow up Flag Status: Flagged Mr. Schwartz: The answers to you questions are below. Please feel free to contact me if you have further questions. 1) Historically, waterflood wells were not required to have surface valves. MUCI-1 was last operational in 2005. Prior to the well requiring a surface safety valve by the new regulations from 2010. Currently, no SVS system is connected to MUCI-1. 2) Historically, waterflood injection into the reservoir was at high rates and consequently high pressure. We only intent to pump at a portion of the rate. BHP on 6-3-2013 was 2,468psig. At TVD, the liquid head column will be 3,938 psi for a total pressure on the reservoir of 6,406 psi. We do not anticipate the reservoir pressurizing above the point at which it will be charged sufficiently to flow to surface. We believe the well will trend toward vacuum once the pump (pressure source) is shut down. 3) Please see attach wellhead schematic and proposed PID mark-ups showing the check valves. We propose a double check at the pump discharge in addition to a check valve near the wellhead in the well room. A high pressure shut down will be installed on the pump in the event of overpressure. This is proposed to be set at 4500 psig. Joe Kaiser CIO Operations Engineer Laiser@hilcorp.com 907-777-8393 Office 907-952-8897 Cell From: Schwartz, Guy L (DOA) [mailto:guy.schwartz@alaska.gov] Sent: Friday, July 27, 201811:26 AM To: Joe Kaiser <jkaiser@hilcorp.com> Cc: Rixse, Melvin G (DOA) <melvin.rixse@alaska.gov> Subject: [EXTERNAL] GPS 18761 MUCI-1(safety valve waiver) Joe, I have some questions regarding the sundry you submitted. 1. What is the reasoning for the waiver ? is current SVS system disabled or non functioning? 2. 1 agree that the well will not back flow in current state of low BHP. But wouldn't that change after a few years of injection? 3. Please forward a current wellhead diagram and proposed showing check install. Guy Schwartz Sr. Petroleum Engineer AOGCC 907-301-4533 cell 907-793-1226 office CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, contains information from the Alaska Oil and Gas Conservation Commission (AOGCC), State of Alaska and is for the sole use of the intended recipient(s). It may contain confidential and/or privileged information. The unauthorized review, use or disclosure of such information may violate state or federal law. If you are an unintended recipient of this e-mail, please delete it, without first saving or forwarding it, and, so that the AOGCC is aware of the mistake in sending it to you, contact Guy Schwartz at (907-793-1226) or (Guv.schwartz@alaska.gov). --- -- -- --� - 3' -- -- ----- -- FW-5032-4'-H9 -- -- -- -- - _- -- 3' -- -- -- I I o 1 2' 4x3 2' 3' 4 PI PI PI I 4x11/2 m I 0/10,000 0/10.000 0/10,000 1 N I PI i ° 1 WELL WEL_ WELL 0/10000 I ( HEAD HEAD HE 74- X 1'SET a AD I I 4500 P® 3/y X 1' PSV 4 SETPSV 4 3' I II 24-13A 4500 PSI M AC2 2 2 3/142 2 g3 4 X/ I 1 I CSO 2 1/z PI 1/2 2 CS ]/1000 CSO MAC1 4500 PSI I I 0/5000 0/15002 1/-22 2 S a C 0 1200 PSI B ET � X 1 1 P 2'X2' PI 1 I M CY SET ® )/100 M CSO 8 1200 PSI I C/600 3' ' PI PI 2 0/800 0/600 * 1 I I 2 PSV 2 2 2 2 I I 1 24-1318 I 4 X 3 I cso );' x i MUC-II MUC-1 GP-53 120o®PSIG 1 2 24-13 I ITER FLOOD WELL — I — — (NIS) WATER FLOOD WELLS LEG—ROOM 4 _ _ _ J _ _ _ LEG ROO_M_3 ----— -- -- -- -- — —— —— —— —— — —— —- 1 3, FW-5030-3'-H9 0 3. I 1 1 i I _ Y o T I PI pl PII 22-13 i 0/6,000 0/6,000 ' WELL WELL HEAD HEAD t I I 4 I I �❑� I ' 4 4 I ( SET ® 3500 - I ' g PSIG INCR. yxt PAHH 1 I SET ® PSV 22-F13 L 2 2 1-1/z• X 2' 2 2 1-1/z' X 2' I 1 3600 PSIG 2-13A I PSV PSV GP-RV-125) 2 2 ' CSO 2 X 1-t/z 12-24A 4 00 PSI CSO 2x11/2 33-14A 4500 PSI T 0SET 0I 0 ( PI 1 3/4 X 1. 2 CS 0/5000 t/z 2 u t/2 2 J SET ® P V V PI PI 1200 PSIG 22-136 o/t000 0/1000 , (GP-096) -- I CSO �- CSO 2x1 /2 1 i I I 1'I2x3/� 1 CSO i 2 PSV 2' X 2' 2 1/2 12-248 1200 PSI '/2 2' X 2' PSV 12-24 a 33-14 33`148 jEoo psl I I 22-13 I (NIS) ABANDONED WATER FLOOD WELLS - (NIS) �———---_——--LEG ROOM 1 DRAWINGS NOTES: REV DATE REVISED � `�° ° o��„„ o�� ,;` �""�� GRANITE POINT PLATFORM 1. *DENOTES: DISCHARGE/VENTS TO ATMOS. Dn 05/c5/94REVISED CUENT'S COMMENTS DS o nr Ks/eM ALASKA UpCOOK INLET YEW7-0 .. e 2Y" AEs1�v Tetcs : rn Ps�d,�'Zaa°F j(N1bH7 ►i�vsws, Sx3� 4��lKrr�' X 3v r1" ►� ?-07$11) NF C*af P#Ap 'ta 'P+►M1 N41ov PA F- 0SM tea= I M' -f OL) (AA04' 2� t,� MCd.Sc� Prig ,�N M � M—crlal t = K?l I wl r oAwc run , wF iu t� 1,1u RAF M Ct (V- A46rca Ay tip, 14fw K(M IN) Of, t91XIYAA 311,01 `+Uov -,lodl v �.. .._._. FQ.M tXT1ON Nt�+►+ 's��. 54Awrl rtt� Ku SPsr�, ice) SE7 6' BDI,I,G .' ps � qsaa s�! Wolf e� , 01 Fw-Sarni 4, *1 41(07. 1W, ILY K Cd[ RE 19U0 HiG C1 PFt+C YCOI ULC rSR MAt DArt c�mvan�r �swa�tt reuwer va�nu,[oar U, I j � -'� �� �'q �� � `"y „�"�" f.•�„ n >x� R Y r., soca a rar.4lCm u��ww+tr. r., ., Are,r r. r-:e^r�h fo +rcK n iERIES 7216 TRANSLTTE TANK TRUCK _ _� __—�� _ _. _ wYc UNOCAL�� ENGINEERING APPROVAL , i �7 ,�N M � M—crlal t = K?l I wl r oAwc run , wF iu t� 1,1u RAF M Ct (V- A46rca Ay tip, 14fw K(M IN) Of, t91XIYAA 311,01 `+Uov -,lodl v �.. .._._. FQ.M tXT1ON Nt�+►+ 's��. 54Awrl rtt� Ku SPsr�, ice) SE7 6' BDI,I,G .' ps � qsaa s�! Wolf e� , 01 Fw-Sarni 4, *1 41(07. 1W, ILY K Cd[ RE 19U0 HiG C1 PFt+C YCOI ULC rSR MAt DArt c�mvan�r �swa�tt reuwer va�nu,[oar U, I j � -'� �� �'q �� � `"y „�"�" f.•�„ n >x� R Y r., soca a rar.4lCm u��ww+tr. r., ., Are,r r. r-:e^r�h fo +rcK n iERIES 7216 TRANSLTTE TANK TRUCK _ _� __—�� _ _. _ wYc UNOCAL�� ENGINEERING APPROVAL , • 0 IT, ECiLEIVED STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 20 AAC 25.280 sUN � �? sBOGCt 1. Type of Request: Abandon ❑ Plug Perforations ❑ Fracture Stimulate ❑ Repa'r Well ❑ Operations shutdown Suspend ❑ Perforate ❑ Other Stimulate ❑ Pull Tubing ❑ Change Approved Program ❑ Plug for Redrill ❑ Perforate New Pool ❑ Re-enter Susp Well ❑ Alter Casing ❑ Other. Variance to 20AAC25.265(b)� 2. Operator Name: 4. Current Well Class: 5. Permit to Drill Number. Hilcorp Alaska, LLC Exploratory ❑ Development ❑ Stratigraphic ❑ Service 169-009 - 3. Address: 3800 Centerpoint Drive, Suite 1400 6. API Number. Anchorage, AK 99503 50-733-20173-00-00 ' 7. If perforating: 8. Well Name and Number. What Regulation or Conservation Order governs well spacing in this pool? N/A Will planned perforations require a spacing exception? Yes ❑ No 2 Granite Pt St 18761 MUG -1 9. Property Designation (Lease Number): 10. Field/Pool(s): ADL0018761 Granite Point Field / Middle Kenai Oil Pool 11. PRESENT WELL CONDITION SUMMARY Total Depth MD (ft): Total Depth TVD (ft): Effective Depth MD: Effective Depth TVD: MPSP (psi): Plugs (MD): Junk (MD): 15,715 14,431 - 11,219 10,066 1,559 psi WA N/A Casing Length Size MD TVD Burst Collapse Structural 381' 24" 381' 381' Surface 437' 18" 437' 437' Intermediate 5,628' 13-3/8" 5,628' 5,019' 3,090 psi 1,540 psi Production 11,257' 9-5/8" 11,257' 10,103' 5,750 psi 3,090 psi Liner 1,130' 5" 11,222' 10,069' 9,910 psi 10,490 psi Liner 11,234' 7" 11,234' 10,081' 6,340 psi 3,830 psi Perforation Depth MD (ft): Perforation Depth TVD (ft): Tubing Size: Tubing Grade: Tubing MD (ft): 10,535 - 11,216 9,402 - 10,064 3-1/2" & 2-3/8" 9.2# / N-80 & 4.7# N-80 10,178 & 10,224 Packers and SSSV Type: Packers and SSSV MD (ft) and TVD (ft): Otis "WB" Perm Packer & N/A 10,158 (MD) / 9,035 (TVD) & NA 12. Attachments: , Proposal Summary Wellbore schematic 13. Well Class after proposed work: Detailed Operations Program ❑ BOP Sketch ❑ Exploratory ❑ Stratigraphic ❑ Development ❑ Service [21 14. Estimated Date for 15. Well Status after proposed work: Commencing Operations: 7/16/2018 OIL ❑ WINJ WDSPL ❑ Suspended ❑ GAS ❑ WAG ❑ GSTOR ❑ SPLUG 11Commission 16. Verbal Approval: Date: Representative: GINJ F-1OpShutdown E]Abandoned E] 17. 1 hereby certify that the foregoing is true and the procedure approved herein will not be deviated from without prior written approval. Authorized Name: Stan W. Golis Contact Name: Joe Kaiser Authorized Title: Operations Manager Contact Email: ikaisef hIICo &= p0 Contact Phone: 907 777-8393 '� � �P � Authorized Signature: • 6� Date: ZS ^ lg COMMISSION USE ONLY Conditions of approval: Notify Commission so that a representative may witness Sundry Number. 1 5 1 S - 7 F5 �J° Plug Integrity ❑ BOP Test ❑ Mechanical Integrity Test (� Location Clearance ❑ Other: if "S*V'� w r�.t�-} �✓� �h/� 'Z -r, '4=` `G Z..') • Z.-4-, -!�_ 60) L) Post Initial Injection MIT Req'd? Yes O/No ❑ Spacing Exception Required? Yes ❑ No Subsequent Form Required: r L l APPROVED BY 1 -"'"' Approved by: _. COMMISSIONER THE COMMISSION Date: ORIGINAL R ,�- 7L,/s G O i 1 mit Form and For mi 0-403 Revised 4/2017 /Approved application is valid for 12 months from the date of approval. Attachments in Duplicate Hilcorp Alaska, LLI SVS — SSV Exemption Well: MUCI -1 Date: 6/27/2018 Well Name: MUCI - 1 API Number: 50-733-20173-00 Current Status: SI Waterflood Injector Leg: N/A Estimated Start Date: July 16th, 2018 Rig: N/A Reg. Approval Req'd? 403 Date Reg. Approval Rec'vd: Regulatory Contact: Juanita Lovett 777-8332 Permit to Drill Number: 169-009 First Call Engineer: Joe Kaiser (907) 777-8393 (0) (907) 952-8897 (M) Second Call Engineer: Michael Quick (907) 777-8442 (0) (907) 317-2969 (M) AFE Number: 1821433 Current Bottom Hole Pressure: 2,468 psi @ 9,089' TVD (SIPT Survey Data 6-3-2013) Current Surface Pressure: 0 psi (Actual Reading) Max. Potential Surface Pressure: 1,559 psi (Based on 0.1 psi/ft gradient) Brief Well Summary MUCI - 1 was initially drilled and completed in the Middle Kenai Oil Pool in 1969. In 1970, a casing leak was detected at —5,700' and repaired. In 1972, a 7" liner was installed and an HCI Acid flush was completed. In 1984, a 5" liner was run, the well was re -perforated in the B and C zones and a new 3-1/2" completion was installed. The well was used for water flood operations until 2005. Notes Regarding Wellbore Condition 1) Shut-in pressure data from June 2013 shows liquid level at 3,933' MD with 0 psi surface pressure. 2) No injection has occurred since January 2005. 3) Water column equivalent (0.433 psi/ft) is 3,935 psi. 4) Pre-injection MIT was performed to 2,500 psi 11-24-17. Request: Hilcorp is requesting a variance of 20 AAC 25.265 (b) to eliminate the installation of an automated surface safety valve due to this injection well being incapable of sustained back flow. During waterflood pumping operations, MUCI-1 will have a full fluid column of water equivalent to —3,935 psi. The current bottom hole shut-in pressure is 2,468 psi. This is a pressure differential deficit of 1,465 psi, indicating the well will be on a vacuum until liquid level stabilizes. Based on the pressure/temperature survey from 6-3-2013, the liquid level is at —3,933' MD. Hilcorp will install a check valve adjacent to the well tree to prevent any backflow to surface as good engineering practice. Attachments: 1. Actual Schematic 2. Pressure/Temp Survey 6-13-2013 _�' L -o" f /i1L l i _/_ 3v .]U 0Granite• Point Field Well: Granite Pt St 18761 MUCI-1 SCHEMATIC Last Completed: 11/27/1984 PTD: 169-009 Hilcorp Alaska, LLC API: 50-733-20173-00 RKB to Tubing Hanger = 38, RKB to MLLW = 106 PBTD:11,219' TD: 15,715' CASING DETAIL Size Wt Grade Conn ID Top Btm 24" 157.5 B 10,635' 22.75 Surf 381' 18" 70.5# B Zone Vetco Thread 2 Surf 437' 13-3/8" 61# J-55 Butt 12.515 Surf 5,628' (TOW) 2.52 40# N-80 Butt& 8.835 Surf 4,963' 9-5/8- 43.5# N-80 LT&C 8.755 4,963' 7,259' 6 47# S-95 8RTST&C 8.681 7,259' 11,257' 5" 18# N-80 Butt/FL4S 4.276 10,092' 11,222' C Zone 23# N-80 Butt 6.366 Surf 6,693' 7" 26# N-80 Butt 6.276 6,693' 9,186' Nov -84 29# N-80 X -Line 6.184 9,186' 11,234' TUBING DETAIL 3-1/2" 9.2# N-80 Butt 2.992 Surf 10,178' 2-3/8" 4.7# N-80 Butt 1.995 10,178' 10,224' JEWELRY DETAIL No Depth (MD) Depth (TVD) ID OD Item Date 38' 38' 10,535' 10,635' OCT Tubing Hanger 1 ±10,112' ±8,991' B Zone XA Sleeve 2 10,158' 9,035' 2.55 4.11 Otis "WB" Perm Packer w/Seal Bore Ext 3 10,176' 9,053' 1.94 2.52 Btm of Mule shoe 4 10,178' 9,055' 1.994 3.875 X -Over 3-1/2" x 2-3/8" 5 10,192' 9,068' 1.875 3.09 Otis "X" Nipple 6 10,224' 9,099' 2.00 4.00 WLREG C Zone 11,050' 11,075' 9,902' 9,927' 25' Nov -84 C Zone 11,100' 11,145' 9,951' PERFORATION DETAIL Zone Top (MD) Btm (MD) Top (TVD) Btm (TVD) FT Date Status B Zone 10,535' 10,635' 9,402' 9,499' 100' Nov -84 B Zone 10,660' 10,705' 9,524' 9,567' 45' Nov -84 B Zone 10,735' 10,785' 9,596' 9,645' 50' Nov -84 B Zone 10,815' 10,825' 9,674' 9,684' 10' Nov -84 B Zone 10,841' 10,851' 9,699' 9,709' 10' Nov -84 C Zone 11,050' 11,075' 9,902' 9,927' 25' Nov -84 C Zone 11,100' 11,145' 9,951' 9,995' 45' Nov -84 C Zone 11,186' 11,216' 10,034' 10,064' 30' Nov -84 Updated By: 1LL06/19/18 Granite Point Platform MUCI #1 18X133/8X95/8X7X3% Valve, Swab, OCT -30, 3 1/16 10M FE, HWO, BB trim Valve, Master, OCT -30, 3 1/16 10M FE, HWO, BB trim Tubing head, FMC -U-00, 13 5/8 5M API hub bottom X 7 1/16 5M top, w/ 2- 2 1/16 5M SSO Unihead, OCT type 2, 13 5/8 5M API hub top X 13 3/8 BTC casing bottom, �- w/ 2- 2" LPO on lower section, 2- 2 1/16 5M SSO on upper section, IP internal lockpin assy Starting head, OCT, 211/4 2M Hubx24XIM Hub w/ 2- 2" LPO, prepped f/18" EN hanger Conductor housing, OCT, 24 X 1M Hub 24" Buttweld BHTA, OCT -13 -11 -AO, 3 1/16 10M FE L1 18" 13 3/8" 9 5/8" 7" 3 %" Granite Point MUCI #1 07/28/2018 Tubing hanger, FMC -U30 -1A - ENS, 7 1/16 X 3 1/2 IBT lift and susp, w/ 3" Type IS BPV profile, 5.990" neck Valve, Wing, OCT -20, 3 1/16 10M FE, HWO, BB trim Adapter, FMC -A-4, 7 1/16 5M Stdd X 3 1/16 10M, w/ 5.990" pocket 11 • Hilcorp Alaska, LLC — MUCI 1 Pressure Temp Survey 6-3-13 0 0 V 1000 2000 3000 4000 m Y 5000 d r- 6000 rL d lei 7000 8000 9000 10000 11000 F_ 50 Pressure (psia) 250 500 750 1000 1250 1500 1750 2000 2250 2500 60 70 80 90 100 110 120 130 140 150 160 170 Temperature (Deg. F) Pressure — Perfs PKR —Temperature • Chevron Steve Lambert Sr. Advising Petroleum Engineer Unocal Alaska Union Oil Company of California Box 196247 Anchorage, Alaska 99519-6247 Tel 907-263-7658 Fax 907-263-7847 salambert@chevron.com November 29, 2007 Thomas Maunder Alaska Oil and Gas Commission 333 W. 7th Ave., Suite #100 Anchorage. Alaska 99501-3509 Dear Tom: ~~~'f DES; ~, ~ 2007 Attached is form 10-404 covering the injection test wf~ic~h ,vy~,S.,perforlrfe~f`'on well MUCI-1 on November 18, 2007. The attached data from the test confirms that there is sufficient injectivity ~ remaining in well MUCI-1 to justify resuming full time injection into the well. The test also confirmed that pressure integrity exists between the tubing and casing. It is planned to return this well to continuous injection as soon as the facility modifications can be made to restore the capability for water injection on a full-time basis.' Initially it is planned to limit injection to 150-200 BWPD plus make-up fluid from the waste water treatment plant. In the future, additional water volumes may be injected. The decision to increase injection will be based on the injectivity response and the response in offset producers. This well successfully passed the MIT in March 2005. A follow-up MIT is planned for March 2009 on the regular test schedule. Sincerely, i F4/ lam.-. _ ~~V~;. i ,may Steve Lambert ~~ cc: MIT book Pat Moore (Exxon-Mobil) NOV ~ Q zQq~ Sharon Sullivan Alaska Oil & Gas Dons, Commission Well File Anchorage .~ ~U~-~ STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSI~ REPORT OF SUNDRY WELL OPERATIONS ~~~ ~I~s6~a tai & Gay Cl~f~s. ~4mmissiun 1.Operations Abandon ^ RepairWell^ Plug Perforations ^ Stimulate^ Other 0 Injep~gph'D~QB Performed: Alter Casing ^ Pull Tubin~ Perforate New Pool ^ Waiver ^ Time Extension ^ Change Approved Program ^ Operat. Shutdowr^ Perforate ^ Re-enter Suspended Well ^ 2.Operator 4. Well Class Before Work: 5. Permit to Drill Number: Name: Union Oil Company of California Development ^ Exploratory ^ C fi9~ ~ ~ 1®0~1 3. Address: Stratigraphic^ Service ^~ 6. API Number: ~ y~l?.~K „~ Box 196247, Anchorage, AK 99519 50-733-2 7. KB Elevation (ft): 9. Well Name and Number: ~9'4~' ~1a(y,•(h~'~ MUCI-1 8. Property Designation: 10. Field/Pool(s): ADL 18761 Granite Point Field Middle Kenai Sands 11. Present Well Condition Summary: '9 ~ " ' ~ ~L•( • 7IS r5 Total Depth measured ~,etf6" feet Plugs (measured) true vertical i~ f•~j ~e ~ y (~, v~ Junk (measured) ~ Effective Depth measured 9,527 - feet true vertical 8,445 feet Casing Length Size MD TVD Burst Collapse Structural Conductor Surface 437' 18" 437' 437' Intermediate 5,973' 13 3/8" J-55, 61# 5,973' 5,339' 3090 psi 1,540 psi Production 11,257' 9 5/8" N-80, S-95, 6,290' 10,151' 5750 psi 3090 psi 40#, 43.5#, 47# Liner 5"-1,130' 7" S-95 N-80, 32# 5"-11,222' S"-10.116' 9,060 psi 8,600 psi 7"- 11,234' S" N-80 18# 7"-11,234' 7"-11,234' 10,140 psi 10,490 psi Perforation depth: Measured depth: 10,535-10,635, 10,660-10,705, 10,735- 10,785, 10,815-10,825', 10,841-10,851', 11,050-11,075' 11,100-11,145', 11,186- 11,216' True Vertical depth: 9,401-9,498', 9,523-9,566', 9,596'-9,644', ~ 9,674'-9,683', 9,699'-9,708', 9,901'-9,926', 9,950'-9,994', 10,033'-10,063' Tubing: (size, grade, and measured depth) 3.5" Buttress N-80 9.2# 10,224' Packers and SSSV (type and measured depth) Otis WB Perm Packer 10,150' 12. Stimulation or cement squeeze summary: Intervals treated (measured): Treatment descriptions including volumes used and final pressure: , -,~ ~~f ,~~ ~~ -~ ~ ~00~ 13. Representative Daily Average Production or Injection Data Oil-Bbl Gas-Mcf Water-Bbl Casing Pressure Tubing Pressure Prior to well operation: 0 BWPD 0 0 Subsequent to operation: 563 BWPD ~ 1,700 psi 2,500 psi 14. Attachments: 15. Well Class after work: Copies of Logs and Surveys Run Exploratory ^ Development ^ Service Q ~ Daily Report of Well Operations X 16. Well Status after work: Oil ^ Gas ^ WAG ^ GINJ ^ WINJ ^~ ' WDSPL ^ 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Sundry Number or N/A if C.O. Exempt: 307-273 Contact Steve Lambert Printed Name ~ - ~q ~ ~ Title Advising Petroleum Engineer n ~ ~ Signature~~~ ~~'~ ~ -' Phone 263-7658 Date 11/28/2007 !Z'tl~d'7 U K t v~ 1 v rl L ~` '~ ~~~~ 12f~~7~~ az •tt-r~ Page 1 of 1 • Maundec, Thomas E (DOA) From: Maunder, Thomas E (DOA) Sent: Friday, December 14, 2007 8:23 AM To: 'Lambert, Steve A` Cc: Greenstein, Larry P Subject: RE: MUCI-1 (169-009} Thanks much Steve. I didn't dig all the way through the procedures. I almost asked if the 2000 psi was imposed. My questions are answered. Tom Maunder, PE AOGCC From: Lambert, Steve A [mailto:salambert@chevron.com] Sent: Thursday, December f3, 2007 4:50 PM To: Maunder, Thomas E (DOA) Cc: Greenstein, Larry P Subject: RE: MUCI-f (i69-009} Tom you are correct, we believe the drop in annulus pressure is a result of temperature effects. As you can see from the attached procedure, we did have the 2,000 psi pressure placed on the annulus. This well had historically injected at very high tubing pressures and we wanted to make sure we had sufficient pressure on the backside of the tubing before starting the test. We were pleasantly suprised that high pressures were not required to obtain injection. The pressure was bled off the casing following the test, and the annulus and tubing appear to be isolated. I have attached the pressure data for this well for the last 2 years which clearly shows pressure integrity between the 2 strings. From: Maunder, Thomas E (DOA} [mailto:tom.maunder@alaska.gov] Sent: Thursday, December 13, 2007 3:35 PM To: Lambert, Steve A Cc: Jim Regg; Greenstein, Larry P Subject: MUCI-i (159-009) Steve, I am reviewing the 404 submitted for the infectivity test conducted an November 18, 2007. On the injection pressure graph, the 7" x tubing annulus pressure starts at 2000 psi and declines. I presume the decline is due to coaling, however I am curious as to why the annulus starts at 2000 psi? Looking at the file, the Inspector notes that there was 2400 psi on the IA when the MIT was conducted March 18, 2005. From this part of the record, it would appear that there is some communication to the inner annulus. Could you provide additional information on this? Thanks in advance. Tam Maunder, PE AOGCC 12/14/2007 C • MUC I-1 Pressure Observations 2500 -,.~.,~~.~„~:, ,____-~_._.._ _ .~,~,.~~. ,,may ~_..,_ .. _> 1 Hours 1 Tubing ' 7" 2000 , ~9 5/8" - - - - - - 1 --- - - - - - - - - ~~ ~ 13 3/8" X20" Rate ~ 1 1500 1 ` 1 a 1000 0 0 500 0 0 0 -- 0 12/14/05 03/24/06 07/02/06 10/10/06 01/18/07 04/28/07 08/06/07 11/14/07 02/22/08 Time Printed on 12/14/2007 at 8:23 AM MUC I-1 Pressure Data 2007 12 12.x1s MUCI-1 Infectivity Test 3,600 3,200 2,800 d 2,400 N 2,000 N a ~ 1,600 O v •= 1,200 800 400 0 n ,~ ~-- ----_ . ---~-Injection Pressure --~ Injection Rate 18 16 14 12 ~ a c~ v 10 ~ ea 8 0 v m 6 ~ 4 2 0 0 20 40 60 80 100 120 140 160 Cumulative Injection (BBLS) • • 3,000 2,500 2,000 .- a m ~ 1,500 N N d a 1,000 MUCI-1 Infectivity Test- Injection Pressures ~--Tubing Pressure -f-Casing Pressure 500 0 ~-~~ ' 0 20 40 60 80 100 120 140 160 Cumulative Injection (BBLS) • • • ~ ~ ~n+rw M v a K0 w® MUCI #1 Injection test 11/18/2007 TIME Rate GPM Rate BPD Volume Total vol Tubing psi 7 in psi 9 5/8 in psi 13 3/8 in psi 7:12 6.38 219 .56 BBLS 0.56 0 2000 450 25 start 'ob 7:23 8.24 283 2.05 BBLS 2.61 0 2000 450 25 well on vac. 7:41 9.08 311 3.64 BBLS 6.26 0 2000 450 25 well on vac. 8:01 12.32 422 5.62 BBLS 11.87 0 2000 450 25 well on vac. 8:14 12.5 429 3.94 BBLS 15.81 750 2000 450 25 well on vac. 8:23 6.44 221 2.30 BBLS 18.12 500 2000 450 25 slow to min rate 8:43 6.44 221 3.12 BBLS 21.24 300 2000 450 25 rate and pressure 8:44 8.45 290 0 BBLS 21.24 400 2000 435 25 increase rate 2 pm 9:04 8.42 289 4.43 BBLS 25.67 600 1950 410 25 rate and pressure 9:15 10.44 358 1.18 BBLS 26.85 600 1950 410 25 increase rate 2 m 9:30 10.45 358 4.6 BBLS 31.45 950 1950 410 25 rate and ressure 9:45 12.44 427 3.54 BBLS 34.99 1050 1950 410 25 increase rate 2 m 10:00 12.44 427 4.79 BBLS 39.78 1350 1950 400 25 rate and ressure 10:15 14.44 495 4.8 BBLS 44.58 1400 1900 385 25 increase rate 2 m 10:30 14.42 494 4.63 BBLS 49.21 1700 1850 370 25 rate and ressure 10:45 16.42 563 5.43 BBLS 54.64 1800 1850 350 25 increase rate 2 pm 11:00 16.42 563 6.16 BBLS 60.8 2050 1860 320 25 rate and pressure 11:15 16.42 563 5.4 BBLS 66.2 2175 1800 300 25 start 3 hour test 11:30 16.41 563 5.78 BBLS 71.98 2200 1850 300 25 rate and pressure 11:45 16.41 563 5.84 BBLS 77.82 2300 1850 280 25 rate and ressure 12:15 16.41 563 13.37 BBLS 91.19 2300 1850 260 25 rate and ressure 12:45 16.41 563 9.91 BBLS 101.11 2400 1800 240 25 rate and ressure 13:15 16.41 563 11.72 BBLS 112.82 2425 1800 220 25 rate and pressure 13:45 16.41 563 11.82 BBLS 124.64 2500 1750 200 25 rate and ressure 14:15 16.41 563 11.8 BBLS 136.44 2500 1700 190 25 rate and ressure 14:16 0 0 1400 ISIP 14:30 0 0 1100 15 min shut in 14:45 0 0 500 30 min shut in 15:15 0 0 0 1 hour shut in . ~V/ÆVŒ rnJ~ ~~~~æ~ . AIßASIiA. OIL AND GAS CONSERVATION COMMISSION SARAH PALIN, GOVERNOR 333 W. 7th AVENUE, SUITE 100 ANCHORAGE, ALASKA 99501-3539 PHONE (907) 279-1433 FAX (907) 276-7542 Steve Lambert Sr. Advising Petroleum Engineer UNOCAL PO Box 196247 Anchorage, AK 99519 SCANNED AUG 2 3 2007 Re: Granite Point Field, Middle Kenai Oil Pool, MUCI-1 Sundry Number: 307-273 ~., q '-~ Dear Mr. Lambert: Enclosed is the approved Application for Sundry Approval relating to the above referenced well. Please note the conditions of approval set out in the enclosed form. When providing notice for a representative of the Commission to witness any required test, contact the Commission's petroleum field inspector at (907) 659-3607 (pager). As provided in AS 31.05.080, within 20 days after written notice of this decision, or such further time as the Commission grants for good cause shown, a person affected by it may file with the Commission an application for rehearing. A request for rehearing is considered timely if it is received by 4:30 PM on the 23rd day following the date of this letter, or the next working day if the 23rd day falls on a holiday or weekend. A person may not appeal a Commission decision to Superior Court unless rehearing has been requested. DATED this ~y of August, 2007 Enc!. Abandon Alter casing D D Change approved program 2. Operator Name: Union Oil Company of California 3. Address: fJ7::S ~ 1, Type of Request: ¢¿) Cfì ~..}..1/0' ~ Ki:.\."t::1 v I.-U ~ STATE OF ALASKA . ~/à AUG 1 7 2007 ALASKA OILAND GAS CONSERVATION COMMI ON i9.;b:> APPLICATION FOR SUNDRY APPROVALS Alaska Oil & Gas Cons. Commission 20 MC 25.280 Operational shutdown Plug Perforations D Perforate New Pool D 4. Current Well Class: Waiver Other J Long Term Injectivity Test Development Stratigraphic D D Exploratory D o Service Box 196247, Anchorage, AK 99519 7. KB Elevation (ft): 106' Perforation Depth MD (ft): 10,535-10,635, 10,660- 10,705, 10,735-10,785, 10,815-10,825',10,841- 10,851',11,050-11,075' 11,100-11 ,145', 11,186- 11,216' Packers and SSSV Type: Otis WB Perm Packer 12. Attachments: Description Summary of Proposal Detailed Operations Program D BOP Sketch D 14. Estimated Date for 8. Property Designation: ADL 18761 11. Total Depth MD (ft): 9,600 Casing Structural Conductor Surface Intermediate Production Li ner Commencing Operations: 16. Verbal Approval: 9. Well Name and Number: MUCI-1 10. Field/Pools(s): Granite Point Field Middle Kenai Sands 'ð-Q \ \,,\"~ - ~Û Total Depth TVD (ft): 8,511' Length PRESENT WELL CONDITION SUMMARY Effective Depth MD (ft): Effective Depth TVD (ft): Plugs (measured): 9,527 8,445' Junk (measured): Size Burst Collapse TVD 437' 18" 437' 5,973' 133/8" J-55, 61# 5,973' 11,257' 9 5/8" N-80& S-95, 6,290 40#,43.5#,47# 5"- 1,130' 7" S-95 N-80, 32# 5" 5"- 11,222' 7"- 7"- 11,234' N-80 18# 11,234' Perforation Depth TVD (ft): Tubing Size: 9,401-9,498',9,523-9,566', 3.5" Buttress 9,596'-9,644',9,674'-9,683', 9,699'-9,708',9,901'-9,926', 9,950'-9,994', 10,033'-10,063' 437' 5,339' 10,151' 3,090 5,750 1,540 3,090 5'-10,116' 7"-10,128 Tubing Grade: N-80 9.2# 9,060 8,600 10,140 10,490 Tubing MD (ft): 10,224' Packers and SSSV MD (ft): 10,151' MD 8/27/2007 Date: J 13. Well Class after proposed work: Exploratory D Development D Service 0 15. Well Status after proposed work: Oil D Gas D Plugged D Abandoned D WAG D GINJ D WINJ 0 WDSPL D Commission Representative: 17. I hereby certify that the foregoing is true and correct to the best of my knowledge. Contact Printed Name Stev Lambert Title Sr. Advising Petroleum Engineer Signature Phone 2 _ .., c... S6 Date COMMISSION USE ONLY 8/16/2007 Conditions of approval: Notify Commission so that a representative may witness Sundry Number: Plug Integrity D Other: Subsequent Form Required: Approved by: BOP Test D Location Clearance D Mechanical Integrity Test D APPROVED BY THE COMMISSION Date: ~ ~~;6u;cate Form 10-403 Revised 07/2005 . . RECE\VED Chevron ~ IIìijíI Steve Lambert Sr. Advising Petroleum Engineer Unocal Alaska AUG 1 7 2007 Union Oil Company of California C . '011 Box 196~71i1t!o On &. I~a s COOS. omm'ss, Anchora~,a....rmRå 9'9'5 9-6247 Tel 907-263-7658 nchøragp Fax 907-263-7847 salambert@chevron.com August 16, 2007 Thomas Maunder Alaska Oil and Gas Commission 333 W. 7th Ave., Suite #100 Anchorage. Alaska 99501-3509 Dear Tom: Unocal is proposing to evaluate the restart of waterflood on the Granite Point platform. As the first step in the process, Unocal requests permission to perform an injectivity test on well MUCI- 1 (Permit No.1690090) using filtered seawater. The purpose of the injectivity test is to determine if water can be pumped into the formation at reasonable pressures and rates. MUCI- 1 successfully passed an MIT on March 17, 2005. A copy of the MIT and form 10-403 are included with this submission. Upon completion of the test, form 10-404 will be submitted summarizing the test. Initial plans for the waterflood would involve injection of produced water supplemented with treated sewage water into 1 or 2 wells. Initial injected volumes are expected to be 200 barrels of produced water per day supplemented with 200 barrels of treated sewage per day. Return of the full field waterflood will not likely occur until the rig is activated on the platform in 2010, Sincerely, ~r\~ Steve Lambert cc: MIT book Mark Pohler (Exxon-Mobil) Well File " . " . . .. STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION Mechanlcalln~rlty Test. Email to:Tom_Maunder@admin.statø.ak.U$;Bob]Jeckenstein@admin.s1ate.ak.us;Jim_Regg@admin..statè.ak.us Larry Greens1øin (greensteinlp@unocal.com); Tim Rodriquez (trodriguez@unocal.com) OPERATOR: FIELD I UNIT I PAD: DATE: OPERATOR REP: AOGCC REP: Unocal Alaska Granite Point Field I Granite Point Platform 3-11-éJ~· Well P.T.D. Notes: Test-Details: n_ e- ;) '. O{. .' TYPE INJ Codes F .. Fresh Water Inj G .. Gas Inj S .. Salt Water Inj N .. Not InjectiÌlg TYPE TEST Codes _ M .. Annulus Monitoring P .. Standard Pressure TèSt R .. Internal Radioactive Tracer Survey A .. Temperature Anomaly Survey D.. Dilferential Temperature T èSt INTERVAL Codes I .. Initial Test 4.. Four Year Cyde V.. Required by Variance T" Test during Workover o .. Other (describe in notes) /I ~ \ , \ MIT Report Form Revised:'06I19102 MIT_Granite Point PIatfòrm_ MM-DO-YV , j \ I I ¡ ~CI-I Injectivity Test Pro. Page 1 of 1 . Maunder, Thomas E (DOA) From: Lambert, Steve A [salambert@chevron.com] Sent: Wednesday, August 22, 2007 11 :35 AM To: Maunder, Thomas E (DOA) Subject: MUCI-1 Injectivity Test Procedure Attachments: MUCI-1 Injectivity Test 8-07,doc «MUCI-1Injectivity Test 8-07.doc» Tom this is the planned procedure for the MUCI-1 injection test. 8/22/2007 . . MUCI-1 Iniectivitv Test Purpose: Determine if well MUCI-1 can be used as a waterflood well. Injection rates required are 250 BWPD. Contact: Steve Lambert: office (263-7658) home (339-2302) cell (952-4297) Conduct a pre-job safety meeting with foreman, operators and roustabout crews. This job could require extremely high injection pressures. All injection lines need to be clearly marked. 1.) Record tubing, 9 5/8" casing and 13 3/8" casing pressures. 2.) Rig up high pressure pump and surface injection lines. 3.) Pressure test injection lines to 6,500 psi. 4.) Bleed off pressure, open valve at the wellhead and gradually increase the injection pressure until injection can be established at the minimum pump capacity. Do not exceed injection pressure of 6,500 psi. 5.) Continue injection at the minimum rate for 30 minutes. Record the tubing, casing pressures and injection rate every 15 minutes. 6.) Increase the injection rate by 2 GPM and continue injection rate for 30 minutes. Record the tubing, casing pressures and injection rate every 15 minutes. Do not exceed injection pressure of 6,500 psi. 7.) Increase the injection rate by 2 GPM and continue injection rate for 30 minutes. Record the tubing, casing pressures and injection rate every 15 minutes. Do not exceed injection pressure of 6,500 psi. 8.) Increase the injection rate by 2 GPM and continue injection rate for 3 hours. Record the tubing, casing pressures and injection rate every 15 minutes. Do not exceed injection pressure of 6,500 psi. 9.) Rig down equipment and backflow tubing and casing so that tubing and casing pressures are less than 100 psi. At the conclusion of the test, send pressure and rate data to Steve Lambert in the Anchorage office. 800 700 600 500 400 300 200 100 o 1 1600 1400 1200 1000 600 600 400 200 o 1 800 700 600 500 400 300 200 100 o 2000 1500 1000 500 o MEMORANDUM ) State of Alaska ') Alaska Oil and Gas Conservation Commission TO: Jim Regg '(7, '2) 4/0"'- P.I. Supervisor '"'{?fq -12 ~ DATE: Friday, March 18, 2005 SUBJECT: Mechanical Integrity Tests UNION OIL CO OF CALIFORNIA MUCI-l GRANITE PT ST 18761 MUCr-l G' M; .,:, ,,'it \~f\Ìf IV FROM: Lou Grimaldi Petroleum Inspector Src: Inspector Reviewed By: P.I. suprv3Cf-.- Comm NON-CONFIDENTIAL Well Name: GRANITE PT ST 18761 MUCI-I Insp Num: mitLG050317153959 Rei Insp Num: API Well Number: 50-733-20173-00-00 Permit Number: 169-009-0 Inspector Name: Lou Grimaldi Inspection Date: 3/17/2005 Packer Depth Pretest Initial 15 Min. 30 Min. 45 Min. 60 Min. Well MUCI-l Type Inj. N TVD 9037 IA 1100 2500 2500 2500 P.T. 1690090 TypeTest SPT Test psi 2259.25 OA 180 400 400 400 Interval 4YRTST P/F P Tubing I 1500 1500 1450 1450 Notes: IA had 2000 psi on it when I arrived. Had operator bleed IA to 1100 psi and observed for 30 minutes with no change. Pressured IA back up to 2500 psi for test. //1 0 <)þ'r SCANNED J\PR 25 20DS Friday, March 18, 2005 Page 1 of 1 ¢ MEMORANDUM State of Alaska Alaska Oil and Gas Conservation Commission TO: Cammy O. Taylor Chair DATE: September 26, 2002 SUBJECT: Mechanical Integrity Tests THRU: Tom Maunder Petroleum Engineer FROM: Lou Gnmaldi Petroleum Inspector NON- CONFIDENTIAL UNOCAL Baker Platform Be-,4, 16, 17, 23 Middle Ground Shoal Field Packer Depth Pretest Imbal 15 MIn 30 Min I I Typelnj.I S I TV. D J 4621 I Tubing J 2950 ] 2950 I 2500 J 2550 I lntervalJ 4 ~ '.".i..Notes:P'T'D'IWelII 1690090Ba'4 ITypetestl P ITestpsil 1155 I Cas,ngI 1550 I 1050 I 1050 I 1050I p/FI p/_ WellI Sa-16 I Typelnj I S I TV.D. I 5067 I Tubing I 1050 I 1050i iI lntervall 4 '" P.T.D.I 1770170 ITypetestl P ITestps,I 1267 I Cas, ngI 41o I 1~°1 164°1 165°1 P/F I P-- Notes: WellI Ba-17 PTDI 1852170 Notes: WellI Ba-23 P.T.D.I 1840110 Notes: TypetestI P ITestps,I 1320 I CasingI 600 1155011510115001 P/F I P Type,nj I S I T.V.D. 18212 I Tub,ngl30~0 13050 13050 13050 I,nte~va, I 4 Type testI P I Testpsil 2053 ICasingI 300 I 2170 I 2150 I 2140 I P/F I P Type INJ Fluid Codes F = FRESH WATER INJ G = GAS INJ S = SALT WATER INJ N = NOT INJECTING Type Test M= Annulus Momtonng P= Standard Pressure Test R= Internal Rad~oacbve Tracer Survey A= Temperature Anomaly Survey D= D~fferenbal Temperature Test Interval I= Imt~al Test 4= Four Year Cycle V= Required by Vanance W= Test dunng Workover O= Other (describe m notes) Test's Details I arrived the platform and was met by Mike Lott (operator) who provided me with the well info. We tested four wells today with all passing their tests. I toured the platform during the tests and found it to be in good condition considering the reduced personel. M IT's performed Four Attachments. Number of Failures' None Total T~me dunng tests 4 hours cc: Chris Myers Steve Meyer MIT report form 5/12/00 L G MIT MGS Baker 09-26-02 LG.xls 9/27/2002 April 16, 1990 Alaska Oil & Gas Ccnse~zation 3001 Porcupine Dr. Anchorage, AK 99504 ~....~.: Ms. Elaine Johnson Dear Ms. Johnson: I have a~tached surface survey locations of the "Legs" and conductors for t~he four platforms in t. he Trading Bay Unit as we!! as the Union Oil-operated Monopod and Granite Poin= Pla=forms. I was unable to locate any Dlats from a regisnered surveyor but I hope t,~is will meet your needs. Yours very Regional Drilling Manager GSB / lew ( (' GRANITE POINT PLATFORM FROM NW CORNER OF SECTION 13, TION, R12W CONDUCTOR Leg~l- Leg#2' Leg#3' Leg#4: "Y" COOR. "X" COOR. WELL # FSL 2,544,566.00 263,297.33 2,544,572.08 263,294.75 13-13 2371 2,544,572.41 263,299.33 44-14 2373 2,544,569.75 263,302.99 33-14 & RD 2371 2,544,565.34 263,303.99 31-23 2366 2,544,561.34 263,302.08 31-14 & RD 2362 1 & 2 2,544,599.42 263,297.83 44-11 & RD 2360 2,544,560.67 263,293.33 Open 2,544,564.50 263,290.83 12-24 2363 2,544,569.00 263,291.42 32-23 & RD#2 2368 2,544,610.00 263,364.00 Compressors 2,544,543.33 263,408.00 2,544,548.16 263,403.42 31-13 2382 2,544,549.91 263,407.59 22-13 ' 2379 2,544,548.66 263,412.00 MUC#1-1 2391 2,544,544.99 263,414.41 MUC#I-2 2386 2,544,540.42 263,413.91 32-13, 33-13 2390 2,544,537.25 263,410.58 24-13 & RD 2392 2,544,537.00 263,406.09 42-23X, 31-23 2380 2,544,539.58 263,402.42 11-24 2383 2,544,544.08 263,401.42 11-13 2379 2,544,499.58 263,341.33 FEL 1267 1262 1258 1256 1258 1261 1269 '1269 1370 1375 1379 1381 1379 1376 1371 1368 1375  STATE OF ALASKA ~ ALASKA ,L AND GAS CONSERVATION C ,.,,vllSSION SUNDRY NOTICES AND REPORTS ON WELLS 1 DRILLING WELL [] COMPLETED WELL [] OTHER 2 Name of Operator UNION 0IL COMPANY OF CALIFORNIA 3. Address PO BOX 6247 ANCHORAGE AK 99502 4 Location of Well 2391'S & 1379'E of NW Cot, Sec 13, TiON, R12W, SM 5 Elevation ~n feet (~nd~cate KB, DF, etc ) KB log' MLLW 12 Lease Des~gnat.on and Serial No ADL-18761 7 Perm,t 59- 8 APl Number 50- 733-20173 9 Umt or Lease Name Union-Mobile State #1 10 Well Number Muci-#1 11 F~eld and Pool Granite Point Middle Kenai Check Appropriate Box To Indicate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO' SUBSEQUENT REPORT OF (Submit m Tnphcate) (Submit ~n Duplicate) Perforate [] Alter Casing [] Perforations ~ Altenng Camng Stimulate [] Abandon [] Stimulation [] Abandonment Repmr Well [] Change Plans [] Repairs Made [] Other Pull Tub,ng [] Other [] Pulhng Tubing ~ (Note Reportmult~plecomplet~onson Form 10-407w~thasubm~tted Form 10-407 for eachcomplet~on) 13 Descmbe proposed 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 12. 13. 14. 15. Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertinent dates, including estimated date of starting any work, for Abandonment see 20 AAC 25 105-170) Commenced Operations $ 0001 Hfs. 10-27-84 ND Tree, NU & Tested BOPE Pulled & Laid down existing 3 1/2" completion assembly. Ran Caliper Survey f/10470-10000 ft. & f/10630-9500 ft. Test csg to 1500' psi w/RTTS $ 9985. Set RBP $ 10,181' DPM w/15 sxs sand on top. Perf'd f/10131-10133' w/4 HPF. Set RTTS ~ 9898' DPM & attempt to breakdown Retrieved PBP ~ 10181'. Ran 5" Liner f/11222-10092' w/127sxs cl "G" CO cmt & ran ccl-GR log to bo~em~ Perf'd for production w/4HPF ~1186-11212' 11125-11145' 11110-11121' 11050-11075' Perfs w/6500' psi - no breakdown. f/10841-10851' 10815-10825' 10735-10785' 10660-10705' 10535-10635' Ran 3 1/2" completion assembly, w/packer at 10158' ELM. Installed BPV, ND BOPE, NU & test wellhead, removed BPV. Released Rig ~ 2400 hrs. 11-27-84. RECEIVED JAN 0 ]985 Alaska Oil & Gas Cons. C0mml Anchorage 14 I hereby ~t the f~J~l~rS~l(~t¢l c_~orrect to the best of my knowledge S,gned L'aW~ence~C~' ~-d..~~0.~-C~uttin¢.. T,tle ENVIRONMENTAL TECHNICIAN The space below for Commms~on use 01-07-85 Conditions of Approval, ~f any By Order of Approved by COMMISSIONER the Commission Date Form 10-403 Rev 7-1 ~0 Submit "Intentions" ~n Triplicate and "Subsequent Reports" ~n Duplicate mion Umon O~1 and Gas I~ on Western Region Umon O~1 Company of Cahfornia P O Box 6247, Anchorage, Alaska 99502 Telephone. (907) 276-7600 union January 8, 1985 Hr. Chat Chatterton AK. Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99504 Dear Hr. Chatterton: Attached is a Sundry Notice Subsequent on Huci-#1 for your information and file. LOC/tj Attachment Very truly yours, Lawrence O. Cutting Environmental Technician RECEIVED JAN 1 0 1~B5 AlasKa 0il & Gas Cons. Commission Anchorage ' ALASKA .L_AND GAS CONSERVATION C ,,,,VIISSION MONTHLY REPORT OF DRILl. lNG AND WORKOVER OPERATIONS Drdhng well [] Workover operauon [] 2 Name of operator UNION OIL COHPANY OF CALIFORNIA 3 Address PO 80X 6247 ANCHORAGE AK 99502 4 Location of Well at surface 7 Permit No. 69--~ ? 8 APl Number $o- 733-20173 9 Un,t or Lease Name UNTON HOBILE STATE 2391'S & 1379'E of NW Cor, Sec 13, TlOn, R12W, SM 5 Elevation In feet (,nd~cate KB, DF, etc ) I 6 Lease Designation and Serial No KB 106' MLLW I ADL 18761 10 Well No GPS MU£T-1 , 11 Field and Pool Granite Point Niddle Kenai For the Month of. November , 19 84 12 Depth at end of month, footage drdled, flsh,ng jobs, dlrect,onal dr,lhng problems, spud date, remarks Released Rig ~ 2400 HRS 11-27-84 13 Casing or liner run and quantities of cement, results of pressure tests Ran 5" scab liner f/10092' - 11222' w/127 sxs CL "G" 14 Coring resume and brief descrlpuon NONE 15 Logs run and depth where run Caliper Survey Caliper Survey f/10630' - 9500' GR-CCL Log Alaska Oil & 6~,,. 1 6 DST data, perforating data, shows of H2S, m~scellaneous data Perf'd ¢/10131' - 10133' w/4HPF 11186' - 11212' w/4HPF 11125' - 11145' ~/4HPF 11110' - 11121' ~/4HPF 11050' - 11075' w/4HPF Perf'd f/10841' - 10851' w/4HPF 10815' - 10825' w/4HPF 10735' - 10785' w/4HPF 10660' - 10705' w/4HPF 10535' - 10635' w/4HPF 17 I hereby certify that the foregoing ~s true and correct to the best of my knowledge ' ~/' ~:' N 12/10/84 LSIGNED g-~C L , TITLE'"~L~NVIRONMENTAL TECHNICIA_ DATE NOTE--Report on th,s form' i~'/reclu,red fo.,r,~ach calendar month, regardless of the status Of operations, and must be filed ,n dupl,cate w~th the Alaska Otl and Gas Conservation Commission by ~'M~ 15th of the succeeding month, unless otherwise d~rected. Form 10404 Submit tn d~Jpl,cate Rev 7-1-80 . f Umon Od and Gas Diws't't ~/estern Region Umon Od Company of CalIfornia P 0 Box 6247, Anchorage, Alaska 9950;' Telephone (907) 276-7600 union December 13, 1984 Mr. Chat Chatterton Ak Oil and Gas Conservation Commission 3001 Porcupint Drive Anchorage, AK 99501 Dear Mr. Chatterton: · MONTHLY REPORTS Attached are Monthly Reports for KTU 13-5, GPS 32-13 GP.S'MUCI-1, KU 43-12, and TBU D-43 for you information and file. If you have any questions, please feel free to contact me at the telephone number listed above. LOC/tj Attachments (5) Very truly yours, Lawr ce~O,O, Cutting ENVIRONMENTAL TECHNICIAN RECEIVED O Ec ! ? 1984 Alaska 0~1 & Gas Cons. Commission Anch0~ age L AND GAS CONSERVATIOn' iMISSION ~ ~ MONTHLY REPORT OF DRILLING AND WORKOVER OPERA'F 2 Name of operator 7 Perm,t No UNION OIL COMPANY OF CALIFORNIA 69-6 3 Address 8 APl Number P0 BOX 6247 ANCHORAGE AK 99502 50- 733-20173 9 Umt or Lease Name UNION MOBILE STATE 4 Location of Well at surface 2391'S & 1379'E of NW Cor, Sec 13, TiON, R12W, SM 5 Elevation in feet (indicate KB, DF, etc ) 6 Lease Designation and Serial No KB 106' MLLW ADL 18761 10 Well No. GPS MUCI-1 11 Field and Pool GRANITE POINT MIDDLE KENAI For the Month of. OCTOBER , 19 8Zt 12 Depth at end of month, footage drdled, hsh~ng jobs, d~rect~onal drdhng problems, spud date, remarks Commenced Operations ~ 0001 hrs. 10-27-84 EOM = 10665' TOF / 15715' TD Recovering Fish 13 Casmg or leer run and quantities of cement, results of pressure tests NONE 14 Cormg resume and brmf description NONE 15 Logs run and depth where run NONE 16 DST data, perforating data, shows of H2S, miscellaneous data NONE RECEIVED NOV Alaska Oil & Ges Cons. Comm;ssio~ Anchorage 17 I hereby cert,fy that the forego,ng ~s true and correct to the best of my knowledge SIGNED¢~~_~~ ~ TITLE ENVIRONMENTAL TECHNICIAN 11/14-84 DATE NOTE--Report on th~s form ~s required for each calendar month, regardless of the status of operations, and must be hied ,n duphcate w,th the Alaska Oil and Gas Conservation Commission by the 15th of the succeeding month, unless otherw,se directed Form 10-404 Submit in duphcate Rev 7-1-80 t' '~ STATE OF ALASKA ,,r'r~ ALA& . .~IL AND GAS CONSERVATIOE ...,MMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL [] COMPLETED WELL OTH ER [] 2 Name of Operator UNION OIL COMPANY OF CALIFORNIA 3 Address 4 Location of Well p. O. BOX 6247, ANCHORAGE, ALASKA 99502 2391'S & 1379'E of NW Cor, Sec 13,TiON,R12W,SM 5 Elevation in feet (ind~cate KB, DF, etc ) ,/D ln~lMI I ~/ 12 6 Lease Designation and Serial No ADL-1876] 8 APl Number 5023:)-20173 9 Unit or Lease Name Union-Mobil State #1 10 Well Number GPS MUCI-1 11 F~eld and Rool Granite Roint Middle Kenai Check Appropriate Box To Indmate Nature of Not~ce, Report, or Other Data NOTICE OF INTENTION TO SUBSEQUENT REPORT OF (Submit m Tr~phcate) (Submit ~n Duplicate) Perforate []X Alter Casmg [] Perforat,ons [] Altenng Casmg [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repmr Well [] Change Plans [] Repairs Made [] Other [] Pull Tubing F-IX Other [] Pulling Tubing [] (Note Report multiple completions on Form 10-407 w~th a submitted Form 10-407 for each completion ) 13 Describe Proposed or Completed Operations (Clearly state all pertinent detads and g~ve pertment dates, mclud~ng estimated date of starting any proposed work, for Abandonment see 20 AAC 25 105-170) 1. Rig up, kill well, remove tree, install and test BOPE to 3000psi. 2. Rull and lay down existing 3 1/2" single completion assembly. 3. Run 7" scraper to top packer at lO120'. Circulate clean. 4. Set packers at±lO,120', 10,470', & 10,970'. 5. Reperforate "C" zone f/+ll,220-11,O00. 6. Reperforate "B" zone f/'~lO,900-10,500. 7. RIH with 7" scraper and-2 3/8" tubing tail and circulate clean. 8. Rick up and run new 3 1/2" completion assembly. 9. Remove BORE, install tree, and return well to injection. RECEIVED Work Reported 141 hereby~f6 re~r~ m~~ n owledge $,gne~.~'~r~''~'' 5m ~R. C-~CE~Jm'""""~'~T:ie DISTRICT DRILLING SUPT. The~JSace below for Commission use AUG i 6 1984 Alaska Od & Gas Cons. CommWsio~ Anchorage Date 08/15/84 Conditions of Approval, if any Approved Copy ,~ Returned ,RIG]MAL SIGNED , ~"-2o,~¢ lit LOt~NIE C. SMIT8 , By Order of Approved by. COMMISSIONER the Commission Date Form 10-403 Rev 7-1 ~0 Submit "Intentions" ~n Triplicate and "Subsequent Reports" ~rt Duplicate GRAAIITE POINT MU I?' PROPOSED WELL COMPLETION 18' C 437' 13 3/8' C 5973' Packer at 10,120' Damaged 7' Casing at 10,210' Packer at 10,470' Packer at 10,970' 1/2' Tubing to 11,003' PBTD I 1,219' 7' C 11,234' 9 5/8' C 11,257' TD 15,715' PERFORATIONS 10,535'-10,635' 10,660'-10,705' 10,735'-10,785' ZONE 10,815'-10,825' 10,841'-10,851' I 1,050'-11,075' 11,100'-11,145' I 1,186'-11,216' ZONE RECEIVED AUG 1 6 1984 Alaska Oil & Gas Oons. Commission Anchorage .o November 17, 1980 Mr. George Stadnicky Union Oil Company cf California P. O. Box 6247 Anchorage, Alaska 99505 Re: Preparation of Petrographic Thin-Sections of Cores from State Well Sample Library. Dear George: Pursuant to our November 13, 1980 discussion on the captioned subject, petmfssign is hereby granted to Union Oil Company of California to cut a maximum of 1 cc. of core material per foot of core from the State's set of core chips from the following wells for the sole purpose of preparing thin-sections within the designated intervals, subject to the conditions set forth below: Sample Set No Well Interval 174 81 124 48 109 215 17 63 93 Amoco Albert Kaloa #1 Amoco MGS 17595 #4 ARCO W. Foreland Unit #3 Pan Am Tyonek St. #1 SOCAL Naptowne Unit #24-8 Union Granite Pt. MUC I-1 [ Halbouty Ak D&M King Oil #I-B Pan Am MGS 17595 92 Mobil Granite Pt. 91 13,067' - 13,078' 7,340' - 8,196' 9,170' - 9,286' 12,832' - 12,488' 13,072' - 13,108' 12,975' - 13,017' 13,300' - 13,439' 10,554' - 10,557' 11,245' - 11,257' Cuts from the State's set of core chips are to be made only out of those individual envelopes or bags in which the total volume of core material is greater than 10 cc. Union will provide the State with a list of the specific core footages from which material was extracted. Union shall bear all costs entailed and will provide Alaska Oil and Gas Conservation Commission with a complete set of all thin-sections prepared. All thin-sections and all core residue materials are to be received by the Commission by approximately February 15, 1981. No core material is to be retained by Union. Mr. George Stadn( cy -2- ~ November 17, 1980 Ail materials are to be transmitted direct to the Commission and are not to be examined by outside parties. We are pleased to work with you in this mutually beneficial endeavor and look forward to your company's continued exercise of care and good judgement in the handling of this limited quantity of well material. I know we both understand that the State's we1! sample library is public property and that grant- ing Union permission to extract portions of material from this library for the purpose of preparing the indicated thin-sections enhances the value of the library and is in the public interest. Very truly y,,ours, William Van Alen Petroleum Geologist cc: Mr. Art Trevena Union Oil Co. of Calif. P. O. Box 76 Brea, California ~";A ~ be ERiCAN FETROLEUM CO O &TION $£CURITY LIFE BUILDING DENVER~ CO[ORAi)O 80202 ~a~ 12, ~970 ~*. ~. JON~ 1'. M. Cuarm /tr. C. C. Woodruff Division Enginee~ Mobil O£1 Corporation P. O. Box 173q Anchorage, Alaska 99501 Dea~Mr. Woodz.~ff~ In mesponso to your letters of April 17 and May 1, 1970, you have oum concurrence, as operator of ~he Chakacha~ma ~oup, to the conversion of s~.Mobil~ted G~an~te Poht Wells~ 2~13, 12-2~, ~2-23X, 33 lq,~~d M~ 1-2, ~ p~uctng to wate~ ~ction status. Yours very truly, M~. 'F. L. F:~anz Skelly 0il Company 1088 Lincoln Towe~ Building Denver, Colorado 80203 Mr. H. W. Patterson Phillips Petroleum Company 1300 Security Life Building Denver, Coloz, ado 80202 M~. Ralph Cox ' Atlantic R/chfield Company P. O. Box 360 Anchorage, Alaska 99501 JUN 22 1970 DIVISION OF OIL AND OAS AN~NORAOl Form REV. 1olO-73 - f Submit "1 ntentions" In Triplicate jr & "Subsequent Reports" in Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to drill or to deepen Use "APPLICATION FOR PERMIT---" for such proposals.) 1. OIL [---1 GAS D WELLL._J WELL OTHER WATER INOECTOR 2. NAME OF OPERATOR UNION OIL CO. OF CALIFORNIA ~. ADDRESS OF OPERATOR P.O. BOX 6247, 4. LOCATION OF WELL At surface 2381' S & 1379' E from N.W. corner, ANCHORAGEs ALASKA 99502 Leq #3, Conductor #3 13. ELEVATIONS (Show whether DF, RT, GR, etc.) Sec. 13 ,TION, R12W, S.M. KB 95' above MSL 14. Check Appropriate Box To Indicate Nature of Notice, Re 5. APl NUMERICAL CODE 50-133-20173 6. LEASE DESIGNATION AND SERIAL NO. ADL 18761 7. IF INDIAN, ALLOTTEE OR TRIBE NAME 8. UNIT, FARM OR LEASE NAME UNION-MOBIL STATE #1 9. WELL NO. MUC I-1 10. FIELD AND POOL, OR WILDCAT GRANITE POINT - MIDDLE KENAI 11. SEC., T., R., M., (BOTTOM HOLE OBJECTIVE) Sec. 13, T1ON, R12W, S.M. 12. PERMIT NO. 69-9 3orr, or Other Data NOTICE Of INTENTION TO: TEST WATER SHUT-OFF FRACTURE TREAT SHOOT OR ACIDIZE REPAIR WELL (other) CHANGE OF PULL OR ALTER CASING MULTIPLE COMPLETE ABANDON* CHANGE PLANS ?0R SUBSEQUENT REPORT OF: WATER SHUT-OFF ~ REPAIRING WELL FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other) (NOTE., Report results of multiple completion on Well ComDletion or Recompletlon Report and Log form.) 15. DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, incluchng estimated date of starting any proposed work. FROM- TO' MOBIL OIL CORP. UNION OIL CO. OF CALIFORNIA RECEIVED 16. I hereby certify that the foregoing is true and correct ~ ' G N ~~ ~, -- ~ ..... ~ -- ~~''~' '~ ~ , .... T' T LE DISTRICT DRILLING SUPT' (This ;~',eJ~[~ate office use) DATE~ APPROVED CONDIT IONS O/~,/APPROVAL, q F ANY: TITLE See Instructions On Reverse Side DATE Approved Copy Returned Form P--3 REV 9-30-69 S~bmit "Intentions" in Triplicate & Sul~equent Reports ' m Duplicate STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to dllll or to deepen Use APP-LICATION FOR PEI~I~Ir--" for such pro~osals ) I 0IL ~ GAS ~-~ OTHER WELL WmLL Water Injection 2 NAME OF OPERATOR Mobil 0il Corporation 3 ADDRESS OF OPERATOR P. 0. Path 7-003, Anchorage, Alaska 99510 4 LOCATION OF WELL At surface 2391' S and 1379' E of NW Corner Sec. 13, TiON, R12W, S.M. Leg 3, Conductor 3. 13 ELEVATIONS (Show whether DF, RT, GR, ere 106' KB 14 5 APl NUIVIF_,~CAL CODE 50-133-20173 6 LEASE DEF~GNAT/ON AND SERIAL NO ADA - 18761 ADL- 18742 7 IF IiN'DIA.N, AJ-J.,OTTEE OR TRIBE NA/VLE $ UNIT, FA~.M OR LEASE NAME 18742 Mobil-Union State ~1 & Gr. Pt. 9 WELL NO Mac I- 1 ., 10 FIELD A.ND POOL, OR WILDCAT Middle Kenai n SEC, T, R, m, (BOttOM HOL~. °mEcrIVE~Lease Line 500' west of NE Corner Sec. 13, T10N,R12W, 12 PER1VLIT NO ~J, M. 69-9 Check Appropriate Box To I,nd}cate Nature of NOtice, Re, tort, or Other D~ta NOTICE OF INTENTION TO: TEST WATEB SHUT-OFF PULL OR ALTER CA~INO FRACTLRE TREAT MULTIPLE COMPI RTE 8H00T OR ACIDIZE -- ABANDON· REPAIR %',ELL CHANOE PLAN8 ~Other) SUBSEQUENT REPORT OF: WATER SIIUT-OFF REPAIRING WELL X~ FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ~ ABANDO~MEKT$ (Other) (NOTE' Report results of multiple completion on Well Completion or Reeompletion Report and Log form.) 15 D~SCRZBE I'nOPOSZD OR COMPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent crates, including estimated date of starting an~ proposed work. Based on our 'notice of intention' acidizing the subject well, the well is repaired and acidized. , dated May 15, 1972, for repairing and Complete workover history of repair and acidize is attached. SIGNED~_- ' t '6~.S~~- ~'~/-~'~--- TITLE Division Engineer (This space for S ate ottice i f APPROVED BY TITLE CONDITIONS OF APPROVAL, IF ANY: DATE ,T~ly 26. l Q7P DATE See Instructions On Reverse Side ( WORKOVER AND AC ID STIMUIATION HISTORY GRAnitE POINT WIW MUC-I #1 JIRVE 14, '72 to JIRVE 16, '72: Rigged up. Installed BOP. Tested gates and choke to 3000 psi and Hydril to 2000 psi. to JUEE 17~ '72: Worked tubing up to 180,000~ - freed tubing. POH. Could not find any visual leaks. Tested blind rams to 3000 psi. DIVISION OF OIL 10,'9 ,t,~)t to JUNE 27, '72: RI/{ with 8~a" bit and 9 5/8" casing scraper on 3 - 4 3/4" DC and 3½" DP. Had to work bit and scraper through tight spot in 9 5/8" casing at 5961'-5969' for 1 hour (10,000 to 20,000~ drag). Ran bit to 10,470' top of permanent packer. Circulated for 2½ hours. POH with bit and scraper. Ran 8 3/8" OD packer picker to 5961' - unable to get through tight place (worked for 4 hours). P0H with packer picker. Ran 8~" Bowen casing roller on BS jars, 6 - 4 3/4" DC and 3½" DP to 5960'. Rolled 5960'-61' for 2½ hours without any progress. POH. Ran 8~" casing swedge on same hook-up, stopped at 5960'. Swedged 5960'-62' in 4 hours, could not go below 5962'. POH. Ran 6" RB and 7" casing scraper to 6113' without any trouble. POH. Ran Tri-State string tapered mill, 8½" x 7" taper with 6½" OD 24" long bull nose. Milled 5960'-5965' in 1 hour. Ran mill through tight spot several times (free). Ran to 6055'. POH. Ran Tri-State 8 3/8" OD packer picker, went through tight spot OK, milled on packer 10,470'-73' for 8 hours. POH with packer (tight at 6082'). Lost packer at 60' and re-engaged; left bottom slips in hole. Ran 7 5/8" OD magnet for slips and junk. Stopped at 10,610', worked and circulated. Unable to go deeper. POH~ recovered small pieces of metal. RIH with v~ RB and 9 5/8" casing scraper to 10,607'. Worked bit from 10,607' to 10,620'. Could not go below 10,620'_,,6 POH with bit and casing scraper. RIH with bit and 7" casing scraper to top of bottom packer at 10,974' · Hole was clear. Circulated bottoms up. POH. RIH with 8 3/8" OD bull nose tapered mill to 10,595' · Milled from 10,595'- 10,615' in 7 hours. POH with mill. Redressed (Continued on Page 2) -2- mill and reran on the same hook-up. Redrilled 10,595-10,615' in 4 hours. Milled at 10,615' for 1 hour without any progress. ?OH. Ran 8" tapered swedge on same hook-up. Attempted to swedge without any progress. Swedge was sticking. Worked 1½ hours to pull loose. POH. Ran 8 3/8" OD tapered mill. Milled 10,609'-10,619' in 16~a hours. POH. Ran 7 3/4" OD bull-nosed tapered mill to top of packer at 10,963' (at 10,973' by DP meas.). ~-,1 f! POH, recovered a piece of packer 7~u OD X 6 3/8"ID x 4" long. RIH with 8 3/8" OD tapered mill, stabilized, to 10,624'. Milled 10,624'--10,632' in lO~a hours. Fell free. Ran to bottom, tagged packer at 10~973' · Circulated, POH. RIH with 8 3/8" OD packer picker on BS, jars, 6-4 3/4" OD DC and 3½" DP. Milled on Otis 9 5/8" packer 10,970'- 10,973' for 2 hours. Jarred packer loose, POH. Recovered packer; left in hole bottom slips, one-half of packer rubber, and scraper ring. RIH with 8~a~'' RB, 9 5/8" casing scraper on same hook-up. Tagged junk at 10,065'. Pushed junk to 11,217' in 2 3/4 hours. Worked on junk at 11,217' for 3½ hours without any progress. Circulated hole, increased pH with caustic. DIVISION OF OiL r~,~"D ('~ to JUNE 29, '72: Ran 268 joints of 7" casing with 5 slim hole centralizers at 10,546', 10,503', 10,460', 10,417' and 10,374', differential collar at 11,144' and float shoe at 11,234'. Circulated hole with injection water. Cemented 7" casing inside 9 5/8" casing with 250 sx. class 'G' cement premixed with 1~ CFR 2 and 16% salt. Mixed cement with filtered inlet water (slurry weight 16~/gal. ). Used top and bottom plugs. Displaced with 415 bbls. filtered inlet water using rig pump at 5 bbls./min. Bumped plug with 2000 psi. Landed 7" casing on OCT slips 40' below KB. Nippled up 13 5/8" x 6" x 5000 psi tubing head hanger. Tested well head to 5000 psi. Installed 6" x 13 5/8" cross-over spool. Nippled up 13 3/8" BOP equipment. Tested BOP rams and manifold to 3000 psi and Hyd~il to 2000 psi. (Continued on Page 3) -3- to JUNE 30, '72: RIH with 6" bit and 7" casing scraper. Drilled collar and hard cement 11,144' to 11,219'. Circulated hole. Tested casing and shoe to 3000 psi. POH. to JULY 1, '72: Dresser-Atlas ran GR - CCL and logged from 11,217' to 9700'. Correlated with original log. Perforated 215' of 'B' zone and 100' of 'C' zone with ~60 perfs and 400 perfs respectiYely, using Jumbo Jet at 4 shots/ft. to JULY 1, '72: Ran 6" RB and 7" casing scraper to 11,219'. Reverse circulated hole. POH. to JULY 2, ~72: Dresser-Atlas set two Otis 7" x 4" bore perma packers at 10,970' and 10,470' on wire line. to JULY 5, 72: Ran .~ tubing with bottom hole assembly, hydrotesting to 7500 psi (found total of 9 leaks - replaced 6 joints of tubing and 9 collars), to 10,460'. Displaced tubing with filtered injection wa%er. Tested 7" x 3½" annulus. Commenced leaking with back flow through tubing at 2000 psi. Tested inside of tubing to 3~00 psi/OK. ?OH. RIH again with tubing assembly, testing externally to 7500 psi- (found 22 leaks - replaced 2 joints of tubing and 7 collars). Tested annulus to 4000 psi/OK. Tested 3½" tubing to 4000 psi/OK. Injected into 'C' zone at 8 cu. ft./min. @5500 psi for 30 min. and at 6 cu. ft./min. ~6000 psi for 10 minutes. Removed BOP. Installed xmas tree. STATUS OF WELL AS OF JULY 1972 T.D. 15,715' 13 3~8" Casing shoe 5,973' 9 5/8" Casing shoe 11,257' 7" Casing shoe 11~234' 7" Casing details as follows(bottom to top): 48 jts., 29#, N-80, X-Line 2043' ' 158 jts., 23~, N-80, Buttress ~ ~ 2-~ jts. Total ;~11~ ~ ~]/~ Landing joint Howco Float Shoe at DIV~S!ON OF OIL /~ .~0 ~?~.~/~ Howco Differential Collar at 2492' 6693' 11,229' 5' 11,234' 11,114' (Continued on Page 4) -4- ?BTD 11,219' Perforations (4 Jumbo Jet shots/foot): "B" ZONE - "C" ZONE - 10,535'-10,635 10,660'-10,705 10,735'-10,785 lO,815'-1o,825 10,841'-10,851 11,050 '- 11,075 11,100' -11,145' 11,186 '-11,216' Tubing - 337 joints of 3½", 9.2~, N-80, special clearance Buttress, plus 3 pup joints. Located on top packer and pulled up one foot. Assembly as follows (KB 38'): (a) Mule shoe guide (b) Otis 2~a" 'N' landing nipple, 2. 208" ]D (c) 30' seals 4" OD x 3" ID (d) 2 3/4" OD X-O sleeve, 2. 313" ID (closed) (e) 2 3/4" OD X-O sleeve, 2.313" ID (closed) (f) 32' seals 4" OD x 3" ID (g) Otis locator sub (h) Otis 'X' nipple 3½" OD x 2.75" 11,007' 11,005' 10,967' 10,956' 10,518' 10,470' 10,469' 436' AC ID STIMULATION: JULY 5, '72 to JULY 6, '72: Tested Dowell lines to 6200 psi. Started acidizing 'C' zone at 1:50 P.M. on 7- 5-72 Acidized in two stages each of 4000 gals. mud acid with treating pressure 5900-6000 psi and injection rate 0.7 to 2.8 BPM. Job completed at 7:14 P.M. on 7-5-72. Injected 2500 bbls. of water in 'C' zone at a rate of 4500-3200 BPD ~6400-6600 psi. to JULY 8, '72: Otis ran plug to isolate 'C' zone. Plug stopped at 10,000'. Attempted to work down without any success. Sheared off from plug at 10,000'. Pumped plug in place to 'N' nipple at 11,005'. Checked with Otis line/OK. Opened X-O sliding sleeves, to 'B' zone, at 10,518' and 10,956'. Tested Dowell lines to 6000 psi. DIViSiON OF O~L ' .D ~t,~CF,;r~,~, ~ ~. (Continued on Page 5) -5- to JULY 8, '72: (~ontinued) Started acidizing 'B' zone at 9:49 P.M. on 7-6-72. Acidized in four stages each of 4000 gals. mud acid, as per program. Treating pressure varied from 4800 psi to 3600 psi at rates varying from 5.6 BPM to 4.5 BPM. Recorded good pressure - rate responses on all st~a~es. Job completed at 11 P.M. on 7-6-72. Injected 4400 bbls. of water at a final rate of 6000 B/D at 6100 psi. to JULY 16, '72: Otis ran retrieving tool to recover plug from 'N' nipple. Recovered top one-half of plug, leaving bottom one-half with ~ ID hole. Ran ball valve, set in 'X' nipple at 436'. Commenced injection. Due to reduced rate of injection, decided to perforate bottom part of tubing for providing more area of fluid going out to 'C' zone. Rigged up Dia-Log. Perforated 1,, ~ tubing at 11,004' with 5 jet shots (3/8" holes). Returned well to injection. PKPaul/mw July 26, 1972 DIVISION OF OiL I ors R~EV 9o$0-69 S~brnit "Intentions" in Triplicate & 'Sut~equent l%eports" m Duphcmte STATE OF ALASKA OIL AND GAS CONSERVATION COMMI'I'I'EE SUNDRY NOTICES AND REPORTS ON WELLS (Do not use this form for proposals to dtHI or to deepen Use APPLICATION FOR 9El~-Vilr--" for such proposals ) AP1 NU~LF.I~CAL CODE 50-133-a0173 6 LEASE DESIGNATION AND SEll/AL NO ADL 18761 ADL 18742 1 7 IF INDIAN, ALLOTTEE OR TFLIBE NAI%IlS O,L ~q 0A, Water Injection ---- WELL WELL ~] OTHER 2 NAME OF OPERATOR Mobil 0il Corporation 3 ADDRESS OF OPEHATOR P. O. Pouch 7-003, Anchorage, Alaska 99510 LOCATION OF WELL At surfa~ 2391' S and 1379' E of NW Corner Sec. 13, TiON, R12W, S.M. l_~g 3, Conductor 3. ELEVATIONS (Show whether DF, RT, OR, etc UNIT, FAP~I OR I~F-~%SE NAME 18742 Mobil-Union State #l &Gr.Pt. 9 WI~L,L NO Muc I- 1 10. FIELD ~ND POOL, OH WILDCAT Middle Kenai 11 SEC , T, R , M 0 (BOTTOM HOLE o~Ecr~v~., Lease line 500' west of NE corner Sec. 13, T10N,R12W, 12 PEPs%lIT NO S eM, 106' KB J 69-9 Check Appropriate Box To Indicate Nature of Notice, Report, or Other Dat~ NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CARING FRACTLRE TREAT MULTIPLE COMPI,ETE REPAIR %%ELL CHANOE PLAN8 ~Other) SUBSEQUENT I~BPORTOF: FRACTURE TREATMENT ALTERING CABIN0 8HOOTING OR ACIDIEING ABAND05MENT* (Other) . (No,z: Report results of multiple completion on Well Completion or Recompletion Report and Log form.) 15 D~SCRIBE PROPOSED OR COMPLETED OPERATIO~,S (Clearly state all pertinent details, and glr~ pertinent dates, lncludinK estimated date of starting any proposed work. Survey indicated that in the subject well, leaks exist in tubing and also in 9 5/8" casing. It is proposed to repair the well, acidize and resume normal injection. to begin immediately, on approval. PROCEDURE 10. th t ' o is true and correct 16[SIGNEDI hereby certify ~/~~~ (This ipace for State offiee~u~J/~/'~ ' CONDITIONS OF AP~ROV~C, I~ A~: -~' 1. Rig up. Kill well if necessary. Install 3000 psi BOPE. 2. Retrieve all the 9 5/8" packers. 3 Run 2k,, bit and clean out to PBTD at 11,239'. ~ ........ 4. Run 7" casing to 11~239' and cement with 250 sx class 'G' ~'-"v~:~.ON O= .... ~ 5. Nipple up well head and pressure test 7" casing to 5000 psi. ~ ..x. 'c~. 6. Perforate intervals 10,535'-635', 10,660-705', 10,735'-785', 10,815'-825' 10,841'-851', 11,050'-075', il,100-145', and 11,186'-216' at 4 shots per foot. 7. Set two permanent packers at 10,970' and 10,470'. 8. Run 3½" tubing and bottom hole equipment. 9. Acidize with 24,000 gallons of mud acid, using diverting technique and mechanical isolation. Resume normal injection. Rig down. Work is TITLE Division Engineer Txr£~hief Petroleum Engineer[ nIT~, May 15:1972 · , See Instructions On Reverse Side Approved Copy Form P--3 ( REV 9-30-6 9 STATE O'F ALASKA Submit "Intentions" in Trtpll~te & 'Subsequent Reports" In Duplicate OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WEI. LS (Do not use this form for proposal~ to dldl or to deepen Use APPLICATION FOR PEP/ViII'--" for such proposals ) ~,'-L -- WEL', '__~ OTHER Water Iniector 2 NAME OF OPERATOR Mobil Oil Corporation 3 ADDRESS OF OPERATOR Pnn~_h 7-003_ Anchnvape, .Ala.gka qqs01 4 LOCATION OF %VF__,I~L ~ - Ats,~,~ace 2391' S and 1379' E of NW Corner Sec. R12W, S.M. (Leg 3, Conductor 3) 13 ELEVATIONS (Show whether DF, RT, GR, etc 106' KB 13, T10N Check Appropriate Box To Indicate Nature of N~)tice, Re ( ~ APl NLrM. F_,R/CA3. CODE 50-133-20173 6 LEASE DESIGNATION A_ND SEP,.IAJ_~ NO ADL 18761 ADL 1874Z 7 IF INDIA_N, A. LLO~ OR TRIBE NAME 8 UNIT, FARM OR LEASE NAME l~o~il Union ]/1 and Gr. Pt. 1874~ate 9 WELL NO MUC I-1 10 FIELD AND POOL, OR WILDCAT Middle Kenai 11 SEC, T, R, M ~ (BOTTOI~ Ii{OLE O~ECnVE) teaseLlne 500' West of NE corner Sec. 13, T10N, R12W, SM 12 PEP~IIT NO 69-9 ~, or Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF PULL OR ALTER CASINO FRACTLRE TREAT MULTIPLE COMPI ETE SHOOT OR ACIDIZE J ] ABANDONs REPAIR ~ELL CHANGE PLANS __ { Other) SUBREQUENT REPORT OF : FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ~ ABANDO~MEI~T* (Other) (NOTE' Report results of multiple completion on Well Completion or Recompletion Report and Log form ) 15 D~ SCRIBE PROPOSED OR COMPLETED OPERATIO%S (Clea~ly state all pertinent details, and give pertinent dates, including estimated date of starting an~ proposed work. In accordance with the approved Notice o£ Intention to repair this welt (dated 12/4/70) the £otlowing work was completed ........... !--l C.-GEOt lZ/ZO-Z3/?o m~ea u~, m~auea ~o~ e~m~men~ ~a ~e~ea ~o ~000 p~i o~. ~ Killed well with injection water weighted to 10~/gat with Calcium Chloride_ ~1,- ENG'~ 12/24-25/70 Pulled 3 1/2" tub~g string. Retested BOP pipe rams and bt d r~-EN to 3000 psi and Hydril to 2000 psi, OK. _/"i>' ...... ., ,. 12/26-27/70 Rolled out tight place /n 95/8" casing £ro~/5961/59655965'J 12/28-29/70 Spotted a 50 sacks Class G cement plug in the 9 5/8" casing with end tubing at 6518'. WOC 16 hours and tagged top of cement at 6395'. Set Continued on next page. 16 I hereby c.~~ (Thi~ space for State office u~) APPROVED BY CONDITIONS OF APPROVAL, IF AN~: DIVISION OF OIL AND GAS ANCHORAGJ TITLE Division Engineer DATE Jan. 21, l g7 ] TITLE DATE See Instructions On Reverse Side Approved Cop~ Returned Form P--~ STATE OF ~ASKA Submit "Intentions" in Triplicate & "Subsequent Reports" m Duphcate OIL AND GAS CONSERVATION COMMrrrEE SUNI~Y NOTICES AND REPORTS ON WELLS (Do not use th~s form for proposals to drtll or to deepen or plug back to a dlfflerent reservoir Use "APPLICATION FOR PERMIT--" for such proposals ) 1 oilWELL [] OAS WELL [~ OT"'' Water Injector 2 NAME OF OPEB~TOR Mobil Oil Corporation 3 ADDRESS OF OPERATOR Pouch 7-003, Anchorage, AK 99501 4 LOCATION O'F WELL At,~rf,ce 2391' S and 1379' E from I~ corner Sec. T 10 N, R 12 W, S.M. (Leg 3 Conductor 3) m~ 15 ELEVATIONS (Show whether DF, RT, GR, etc 106' Kb ~ API LCAL CODE 50-133-20173 6 ~E DES/GNATION A-ND SEHIAL NO ADL 18761 ADL 18742 ? IF INDIAN, A.LLO'rr~ OR TRIBE NAiVI~ 8 UNIT FARM OR LEASE NAME Mobil-Union State #1 and ,. 'w~gte PoinL 18742 l~JC I #1 10 FIF~.I~ AJND POOL, O1~ WILDCAT Middle Kenai 11 SEC , T , R , M , (BOTTOM HOI~E LOB~ECTXV~ ease ~ne 500' West of NE corner Sec. 13, T 10 N, R12W, SM 12 PEP~MIT NO 69=9 Check ~ia.~e ~0x T° I,nc~t~ 'Nat'ur, of N~ot~ce, Report, or Other l)a~a NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: FRACTURE TREATMENT ALTERING CASING SHOOTING OR ACIDIZING ABANDONMENT* (Other)  NOTE: Report results of multiple completion on Well ompletion or Recompletlon Report and Log form.) TEST WATER SHUT-OFF { [ PULL OR ALTER CASING FRACTLRE TREAT MULTIPLE COMPLETE REPAIR WELL , CHANGE PLANS { O~her) , 15 DESCRIBE PROPOSED OR CO.MPLETED OPERATIONS (Clea~ly state all p~rtinent details, and give pertinent dates, including estimated date of starting an~ proposed work. This well has a high pressure tubing leak and an apparent leak in the 9-5/8" casing. It is proposed to pull the 3-l/2" tubing, locate and repair the 9-5/8" casing by squeeze cementing, rerun the tubing and place the well back on water injection. Procedure: . 2. Pull the 3-1/2" tubing and remove the gas lift mandrels. 3. Locate the casing leak and repair by squeeze cementing, 4. Clean out any fill to 11,257', PBTD. 5. Rerun 3-1/2" tubing and commence water injection. Kill the well with injection water or salt water as necessary and install B.O.P.s. TITLE Division Engineer TITLE u. ~3. 'WOod-rOt~ , ~ // ./' Ap~IRo¥~D 2YiThi, ipace for State~ (~~ofl~e use)" ' F'*D~ . CONDITIONS OF APPRO~AL, iF A~ ~ bf See lnstructlons On Reverse Side Approved Copy Returned Submit "Imtentlons" in Triplicat~ & "Subsequent l~ports" in Duplicmte STATE OF ALASKA OIL AND GAS CONSERVATION COMMrl-rEE SUNDRY NOTICES AND REPORTS ON WELLS (D~ not use thru form for proposals to drill or to deepen or plug back t~ a d~flerent relal~0t~ Use "APPLICATION FOR PERMIT--" for such proposals.) , 0IL WELL r~. GAS Water Injector WELL [~ OTHER 2 NAME OF OPEt~ATOR Mobil Oil Corporation 3 ADDRESS OF OPERATOR P. O. Box 1734, Anchorage, Alaska 99501 4 LOCATION OF W~L At-~urfa~ 2391' S & 1379' E from NW corner Sec. 13, T10N, R12W, S.M. (Leg 3, Conductor 3) 13 ELEVATIONS (Show whether DF, RT, GR, etc 106' KB (MLLW) 14 HLB .,~ stmmmc.~., cons OKG - 50-133-20173 '"~' ;6I-'F'ASEDE~ONATIONA. ND~N0, ~L 18761 ADL 18742 ? IF INDIA.N. A_L,I.,OTTEE OR TRIBE NAME -- FILE S UNIT, FA.R/VI OR LEASE NA1VIE Mobil-Union State fbl, Granite Pt. ~ ~ ~o State MUC~I- 1 10 F~ ~ P~L, OR W~CAT Gran~e P~. - ~ddle Kena~ 11 SE~2, T, R, M, (BOTTOM HOLE BJEC-nVr~. ease ~_ne 500' ~est of NE corner Sec. 13, T10N, R12W, S.M. 12 PER_,MXT NO J 69-9 ~ ~ia~ ~x To I~i~ N~tum ~ ~t;Ce, ~, ~ ~h.er Dat~ NO~IC~ O~ IN~N~0N TO: TEST WATER SHUT-OFF ~--q PULL OR ALTER CASING $UBIEQUENT R~PORT OF : FRACTURE TREAT [J~- MULTIPLE COMPLETE FRACTURE TBEATM'JNT ALTERING CASING SHOOT OB ACJDIZE ABANDONs SHOOTING OR ACIDIZINO ABANDONMEN'T· REPAIR WELL CHANOE PLANS (Other) (Other) Initiate Water Injection (NOTE' Report ~esults of multiple completion on Weli Completion or Recompletion Report and Log form ) '15 DESCRIBE PROPOSED OR COMPLETED OPERATIONS (Cleatly state all pertine,tt details, and give pertinent dates, including estimated date of starting an) proposed work. Refer: Granite Point Field Pressure Maintenance Project Conservation Order f~76 dated 9-12-69 This well is one of six wells to be utilized as injectors in our water injection pattern. It is anticipated that production will be terminated and water injection initiated on approximately July 1, 1970. Injection time and quantities of water injected may be sporadic until injection rates, pressures and profiles are established. We request approval to initiate water injection in this well. RFCf V.FO · JUN_ 2 2 1970 DIVISION OF Oil AND GAS ANCHORAGE 16 I hereby ~re~ W SIGNED ._ DATE 6/19/70 and correct ~_  Division Engineer (Thla ,pace for Stat~i//Suf) . ///~ ~______~.../~..~ ~, CONDITIONS oF ~PPROVAL, ~ A~: TITLE *A. V. Barnett for C. C. Woodruff DATE See Instructions On Reverse Side Approved ~ Returned ~rm No P---4 ~ ~-30-67 ( STATE OF ALASKA OIL AND GAS CONSERVATION COMJVdTTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS I OIL [~ G~S [~ WKLL WELL OTHER 2 NAME OF OP~ATOR Mobil 0il Coroporation 99501 13, TION, R12W, S.M. AP1 NUA{ERICAL CODE 3 AD~'RESS OF OPEI%ATOR P. 0. Box 1734 A~cho~a§e, Alaska ( SUBMIT I~ DUPLICATE 4 LOCATION OF WELL (Le§ 3, Conductor 3) 2391'S & 1379'E fr NW Cor. Sec. 50-133 -20173 6 LF~ASE DESIGNATION AXD SEqRIAL NO ADL 18761 & ADL 18742 7 IF INDIA),~, ALe'1 1 ~ OR TRIBE NAME ~-z~n;. ~.~.on. LE^S~ t a t e tf~Stae 1 mo~.~.-~nzo~ ~ Granite Poznc 18942 g wELL NO MUC #I-1 10 ~ ~ND m l~ O %' ~ranzce ~zn~2~~e Kenai & Wildcat 11 S~ , T , R , M (~OM HO~ o~ Lease line 500'W of NE Cor. Sec. 13~ TION, R12~, S.~. 69-9 13 REPORT TOTAL DEPTH AT END OF MONTH, CH.A~%'GES IN HOLE SIZE, CASING ANT) CE1VIENTiNG JOBS INCLUDING DEPTH SET AiWD VOLU1ViES USED, PERFORATIONS, TESTS ANT) RESULTS. FISHING JOB~ JUNK IN HOLE AND SIDE-/qlACKED HOLE AND A_NY OTHER SIGNIFICANT CHA_NGES IN HOIA~ CONDITIONS July 1969 Perforated 4 jets, per foot at intervals 10,535'/11,216' Set packers & ran 3-1/2" tubing for completion. Released rig 12:'00 Midnight 7-2-69. FINAL REPORT 14 I hereby cel:~lfy j~l~t the foregomg m true .and ~~ //,~~/-_,~ Area Engineer 8-18-69 SIGNED '~fl TITLE .--- DATE NOTE--Report on th,s forfn ~s reqmred for each calendar month, regardless of the status of operations, aflcl must be fded m duphcate w~th the D~ws~on of Mmes & Mmerals by the 15th of the succeedmg month, unless otherwise d~rected CO gE IAL STATE OF ALASKA ~Seeothertn-[ , OIL AND GAS CONSERVA~ON ~ ....... ~e ~,de~l · ~x ~~ ~r ..... ""'' , T ,~ , ,,' ~/~,;~ ~; ~ . ~7 ~ ~-~ WELL cOMPLETION OR RECOMPLETION REPORT AN ~. TYPE OF COMPL~ON: ~ -- NEW WORK OVER [] PLU(. DIFF E.~ D*¢K [--1 nEsva r-~ Other ~AME OF OPIRATOR ~obil 0il Corporation ADDRgS~ OF OPERATOB ~ ?. 0. Box 173~ Anchorage, Alaska ~¢501 4. LOCATIO,~ Or WELL (Report location clearly and in accordance with any State requirements)* At surface 2391'S & 1379'E fr NW Cor., Sec. 13, TION, R12W, S.M. At top prod. Interval reported below Mobil-Union State #1 & Granite Point State #18742 9. W~:i.T, NO. ~C # I-1 Z0. ~,~.n ~ ~m. OR w~~iddle Granite Point Field-Kenai ~ ~., ~.. m., M., (~ ao~ ' o~~) Lease L~ne 500~ ~esC of 2132'N & 3757'E from Surface Location (10,535'MD) At total depth ~00~ NER12wCOrner,, S.M. Sec. 13 , TION, ~ 3080'N & 3135'E from surface location (15,715' T.M.D.) ~$b'~p 'x,. ~rr No. ,,~ ~ . , , . ~ : 69-9 . , 18.~ T~ D~H, Mn & TVD pr. ~LUG ~dK ~D & ~. ~ ~'r~ ~., ' [ 21. .5 715'~ 14.415'TVD[ ~'MD 10079TVD[ ~w~v. ! ,o~,,, Too~s . - ' ~ ' / ~.--ff' . [ - ~ ] Surface/TD -- ~.~PRODUC~G ~'r~V~(S). O~ 'r~ ~M~'i'i~, ~M. Nl (D ~ '~v~), ~.'W~ · '~ ! ~ SURV~ Middle Kenaz Top. {0525 M.D. 9390 T.V.D. Bottom~ !1216' M D 10060' T V D ] ~es t DIL, Sonic, Dens[ty;iLL-3, Newtron, CBL , ' ' ~ t e~n 811 strips set ~ wl ; 18 [ 70.~ ;[ B [ 437' [ 22" '[700 Sax,Cl, as~ G to aurfa~e - ~ _ .... / ~t J I I l:~ ~,~ ~side~raeked ,at 5fl28,' ~ - , I I [,,,, Cq0 s.x,cz.s ' 1" ~. LIN~R ~CO~'~ ' i.q _ OK ; ~ S}~E' '~OP (D)'~ [ BOSOM (MD),SA~S ~., S~..~ (D)~Z. [ D~'S~ (~) [ PACK~ S~ (D) ~,4 Jet H/ft ~rall intervals m~z~;,z~(~, 10535/635 ~.i '1~840/~51 Total 315' Placed t00 sax pH plug w/bottom ~ 128941 : 10660/705 11050/9~5 1260 holes Placed 225 sax ~H plug with bottom at , 10735/785 11100/11145 11,4~8' &'~t~ of plug 'drilled off to 112~' ~ ~ ,j .... ;,,.,~r~ e ~1~ set ~t 11239' ~ I ,', BODUO~iON DATE FIRST PRODUE~ON [ ~O~CTION, ~ . , ME'I'HO~ lFlow~., , , ~as hf~, p p~--~ ~ t~pe p~9) [WE~ ~TA~S (~oduc~ or f 7 ~r P~oD ,p~BmU G~c~. WA~B~ lo,-Om ~O ! , t l i 24 ~ [ , ~ [~-HO~ ~ i ' · "' ~- [O~ G~V~-~ '(C~ )  TEST WITNESSED BY for fuel and fiared .' USedoF 33 I hereby certify that the ~oregollg and ' ~ at~ahed~ lnfo~mation ~. complete and correct a~ ~etermined from alUavallable , s ~E~~ -~ _ ~/~. ~I~E Area Engineer ~AT~ ~-9-6~ ..... · (See Instructions ~n~ S~ces [or A~ifionol Dote on Reverse Si~e) INSTRUCTIONS General: !This f0-rm is designed>fgr submitting: a fqmplete end correct ~elt. c0mpletion:repor~ ~nd~: log all ~pe~ of ~an~ a~d I~ases;';.in Alaska.; "'" ' ' ' ' : ' ~ ,not'otherwise; ' ' ,~:;'-,~ I~icate.:Whic~elevation is used as reference (where shownLfor depth measure~ men~_gi~en in 9t~r s~ces;pn tbj~ form and,in any~ attochments. ~ms'2~ and ~:~;l~-th~s~well is co~eted~or :separate pr~ductidn from ~ore lhan~, o~ i0t~rval zone (multiple c~le}ienL. ~:~te in item 20, ~nd 'in item 22 sh~w '}he p, cd~ing to~;s), ~tt~(S)~'and"n~m~'(s) y-th& iot~rval }eported in item BP- S~b~aZ' ":';:~pa~atec re~}_~ " (pa~) on t~ ~fO~,: ~ditional intei va[ :~o ~se~a~ly ~r~,~ ~26: ';~ks '~} :;~tach~-~up~Ul ~ r~ds for this w~ll shouJ;d~ g~W"th~' d6tairs 6f'6h~ tiple sta~ ~enting and~ :i6~fi~f~'i~e ~nt~g t~l. -, ~m 28~-Subm~!,~',~rate}completio~ ':~e~r.t on: this form for eacE int~f~al to ~ ~eparately prOUd. ~ insf~UcfiOn fOr i~ms'.20 a"d22 ~e)? .... . ' ~:~ ~ : -: ' - - - ;''~r ' ~ .: '~ . ~ ::WATER ;- ~ ~. 1-2;qts:. brackish water .... . , · ~ ~. 127~;5!~i3;017~::; H;ml°C~k,;~; say congl. ~hd , Chronological Well History Granite Point State MUC #I-1 - 2 - August 7, 1969 6-2 - 6-8 6-8 - 6-11 6-11 - 6-16 6-16 - 6-20 6-20 - 6-25 6-26 6-27 - 6-30 7-1 - 7-2 7 -2 -69 Drilled 8-1/2" hole 14,655'/14,945'. Cored 14,945'/14,971' and recovered 26'. Drill string parted leaving fish from 11,932'/14,890'. Backed off fish at 14,070'. Jarred and recovered fish. Drilled 8-1/2" hole 14,971'/15,058'. Ran electrical logs. Drilled 8-1/2" hole 15,058'/15,416'. Drill pipe parted at 1789'. Worked and recovered fish and milled on junk. Drilled 8-1/2" hole 15,416'/15,700'. Ran electrical logs. Cored 15,700'/15,715', and recovered 15'. Ran electrical logs. Ran casing caliper in 9-5/8" casing. Placed a 100 sax cement plug in the 8-1/2" hole with open end drill pipe hanging at 12,894'. Placed a 125 sax plug with drill pipe at 11,458'. Located top of cement at 11,269'. Placed a 100 sax plug with drill pipe at 11,268'. Drilled out hard cement to 12,242' and set a cast iron bridge plug at 11,239' in the 9-5/8" casing. Hole below bridge plug abandoned. Perforated intervals between 10,535' and 11,216'. Set permanent production packers in 9-5/8" casing at 10,470' and 10,970'. Ran 3-1/2" tubing and placed well on production by gas lift. Released rig 11:59 PM 7-2-69. CHRONOLOGICAL WELL HISTORY GRANITE POINT STATE MUC #I-1 1-18-69 1-18 - 1-19 1-20- 2-3 2-4 - 2-15 2-16 - 2-18 2-19 - 2-20 2-21 - 2-27 2-28 - 4-5 4-6 - 4-7 4-8 - 4-12 4-13 - 4-15 4-16 - 5-1 5-2 - 5-4 5-4 - 5-6 5-7 - 5-13 5-14 - 5-31 6-1 - 6-2 Spudded Drilled 12-1/4" hole to 450', opened to 22" and cemented 18" casing at 437' with 700 sax. Drilled 12-1/4" hole 450'/6007'. Opened to 16" to 6007' and to 17-1/2" to 1335'. Cleaning out hole & fishing for drill string stuck at 2250' with top at 2044'. Recovered fish. Ran and cemented 13-3/8" casing at 5973' with 750 sax around shoe and with 2200 sax through DV collar at 1992'. Cement returns to the surface. Ran in to drill ahead and found 13-3/8" casing had parted at the float collar at 5893'. Could not mill casing fish. Milled window in the 13-3/8" casing from 5628' to 5674'. Underreamed window to 17-1/2" and placed a 133 sax plug containing 15 sax sand with drill pipe at 5674'. Ran in to 5674' ,could not locate cement. With DP at 5674' placed a 150 sax plug containing 20 sax sand. Waited on cement 71 hours and cleaned out hard cement to 5638'. Sidetracked casing fish and drilled 12-1/4" hole from 5638' to 11,158'. Stuck drill string at 9911'. Backed off at 9880'. Recovered fish. Ran electrical logs. Milled on junk and drilled 12-1/4" hole from 11,158' to 11,298'. Cemented 9-5/8" casing at 11,257' with 900 sax cement. Drilled 8-1/2" hole from 11,298' to 12,955'. Ran electrical logs. Drilled 8-1/2" hole to 12975'. Cored from 12,975' to 13,017'. Recovered 38'. Ran DST #1 on the interval 12,910'/13,017'. Drilled 8-1/2" hole 13,017'/13,548'. Ran electrical logs and drilled 8-1/2" hole 13,548'/14,641'. Cored 14,641'/14,655'. Recovered 12'. Ran electrical logs. UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D PAGE NO. 2 LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 11219' PBTD/ 15715' TD 1D 10/27/84 13 3/8" C. 5628' 9 5/8" C. 11257' 7" C. 11234' 95 PCF 91 SEC DALLY COST: $ 69,046 ACC COST: $ 69,046 AFE AMT: $1,035,000 11219' PBTD/ 15715' TD 2 D 10/28/84 13 3/8" C. 5628' 9 5/8" C. 11257' 7" C. 11234' 94 PCF 75 SEC SKID RIG #57 OVER MUCI #1. COMMENCE OPERATIONS $ 0001HRS, 10/27/84.RU DA WL & RIH W/ 1 11/16" SINKER BAR TO 10815'. POH. RIH W/ FLOW METER TO 10120'. RU BO HUGHES & ESTABLISH INOECTION OF 1.5 BBL/MIN, TAKING FLOW OUT ANN. LOG UP W/ FLOWMETER-NO LEAK EVIDENT. RD DA WL. ND TREE. BOLTS & FLANGES ON TREE CORRODED. CUT BOLTS. NU & TST BORE. RU & PULL ON TBG - NO MOVEMENT. RU APRS. DAILY COST: $ 37,348 ACC COST: $ 106,394 AFE ANT: $1,035,000 10665' TOF/ 15715' TD 3 D 10/29/84 9 5/8" C. 11257' 7" C. 11234' 93 PCF 47 SEC RIH W/ FREEPOINT INDICATOR. FND TBG FREE TO 9500' W/ 155,000# PULL. POH. RIH W/ 2 19/32" TBG CUTTER & CUT TBG $ 9500'. POH. RD APRS. POH-LD TBG. FND TBG HAD PARTED $ +10665'. RIH W/ 6" BIT. DAILY COST: $ 34,331 ACC COST: $ 140,725 AFE AMT: $1,035,000 i<ECEiVED A:aska Off & Gas Cons, Anc horaoe SHEET D PAGE NO. UNION OIL COMPANY OF CALIFORNIA WELL RECORD LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 10665' TOF/ 15715' TD 4 D 10/30/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 43 SEC RIH W/ 6" BIT TO TOP OF PKR $ 10118' DPM. CIRC BTMS UP. POH. RIH W/ TSA PKR BURN- OVER ASSY (BHA #2). BURN OVER PKR - TOOL FAILED. POH. DAILY COST: $ 31,741 ACC COST: $ 172,466 AFE AMT: $1,035,000 10665' TOF/ 15715' TD 5 D 10/31/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 43 SEC DAILY COST: $ 29,109 ACC COST: $ 201,575 AFE AMT: $1,035,000 10665' TOF/ 15715' TD 6 D 11/01/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 43 SEC DAILY COST: $ 52,163 ACC COST: $ 253,738 AFE AMT: $1,035,000 10665' TOF/ 15715' TD 7 D 11/02/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 44 SEC RIH W/ TSA BURN-OVER ASSY (BHA #2A) & BURN- OVER PKR ® 10118' DPM. PKR FELL FREE. POH. RIH W/ TAPER TAP (BHA #3) & CHASE PKR TO 10,188'. RKR STUCK, TARRED INTO RKR. DRAGGED PKR UR HOLE TO 9500' & TAR RELEASED. RIH W/ 4 1/16" INSIDE GRAPPLE & CHASED RKR TO 10188'. ENGAGE RKR & ROH. RECD RKR & 12' SEAL BORE EXTENSION. RU DA WL. RN 4 ARM CALIPER SURVEY F/ 10470' TO 10000'. FND CSG COLLAPSED F/ 10185' TO 10192' & F/ 10226' TO 10232'. MIN ID LESS THAN 5.70" EACH SPOT. ROH. RD DA. RIH W/ 5.75" SWDG & WORKED THRU BOTH TIGHT SPOTS. POH. RIH W/ 5.875" SWDG. UNABLE TO WORK THRU TOP TIGHT SPOT. ROH. ROH W/ 5.875" SWDG 12' EXTRA 4 3/4" DC (21 TOTAL DC). WORK SWG $ 10197' FOR 1.5 HRS W/ NO PROGRESS. POH. RIH W/ 5.8125" SWG (BHA #8) & WORK THRU BOTH TIGHT SPOTS. POH. RIH W/ 5.875" SWG (BHA #9). DAILY COST: $ 30,379 ACC COST: $ 284,117 AFE AMT: $1,035,000 UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D RAGE NO. LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 10665' TOF/ 15715' TD 8 D 11/03/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 44 SEC DAILY COST: $ 30,279 ACC COST: $ 314,396 AFE AMT: $1,039,000 10665' TOF/ 15715' TD 9 D 11/04/84 9 5/8" C. 11257' 7" C. 11234' 95 PCF 52 SEC WORKED 5.875" SWG THRU BOTH TIGHT SPOTS (10197-10199' & 10238-10239'). POH. RIH W/ 5.9375" SWG (BHA #10) & WORKED THRU BOTH TIGHT SPOTS. OARS FAILED WHILE WORKING SWG UP THRU TOP TIGHT SPOT (10198.5'). RU APRS & BACKED OFF SWG ON 3RD TRY. RD APRS. POH W/ BHA ~10. P/U NEW OIL OARS. RIH & ROTATE INTO SWG ~ 10198.5'. SAPPED THRU TIGHT SPOT. ROH. RIH W/ 6" SWG (BHA #11) & WORKED ~ 10197' FOR 3 HRS W/ NO PROGRESS. POH. RIH W/ 5.9375" SWG (BHA #12). DAILY COST: $ 31,171 ACC COST: $ 345,567 AFE AMT: $1,035,000 10665' TOF/ 15715' TD 10 D 11/05/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 51 SEC DAILY COST: $ 49,525 ACC COST: $ 395,092 AFE AMT: $1,035,000 WORKED 5.9375" SWG THRU TIGHT SPOTS F/ 10197-10199' & F/ 10238-10239'. POH. RU APRS & RUN DIA-LOG 64 ARM CSG INSP LOG. THRU BAD SPOTS. OD OF MILL FND TO BE RD APRS. LOG SHOWED BOTH COLLAPSED SECTIONS TO BE AT CSG COLLARS. REMAINING WALL THICKNESS ~ 10198'. = +1/16". RIH W/ 5 3/4" PKR MILL ASSY. COULD NOT WORK THRU TOP TIGHT SPOT. POH. UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D PAGE NO. LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT 'DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 10665' TOF/ 15715' TD 11 D 11/06/84 9 5/8" C. 11257' 7" C. 11234' 95 PCF 49 SEC DAILY COST: $ 32,182 ACC COST: $ 427,274 AFE AMT: $1,035,000 RIH W/ 6" TAPERED MILL & 5 13/16" STABILIZER (BHA #14). MILLED F/ 10194-10199' & F/ 10235-10240'. CIRC BTMS UR. POH (NO DRAG THRU BAD SPOTS). OD OF MILL FND TO BE 5 15/16". RIH W/ RRT (BHA #15) & TAG PKR $ 10475'. BURNED OVER RKR F/ 10475-10477'. RKR FELL FREE. ROH. REC RKR. RIH W/ 5 3/4" SHOE & 364' OF WASHRIRE. 10665' TOF/ 15715' TD 12 D 11/07/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 46 SEC DAILY COST: $ 31,635 ACC COST: $ 458,909 AFE AMT: $1,035,000 10665' TOF/ 15715' TD 13 D 11/08/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 49 SEC DAILY COST: $ 47,849 ACC COST: $ 506,758 AFE AMT: $1,035,000 WASHPIPE TAGGED UP $ 10522'. WORKED TO 10535' -UNABLE TO WORK DEEPER. POH. RIH W/ 6" TAPERED MILL (BHA #17) & MILLED F/ 10535'- 10541'. ROH. MILL HAD MARKS F/ 4" OD TO 6" OD. RIH W/ 5 1/4" SWG (BHA #18). WORKED SWG THRU TIGHT SPOT $ 10541' W/ 15000# DRAG. RIH & TAG TOF $ 10665' DRM. CIRC BTMS UR. ROH. RU ARRS & DIA-LOG FOR MIN ID CALIPER. RIH W/ DIA-LOG MIN ID CALIPER. TOOL STOPPED 8 10568'. POH. FND SNK IN CALIPER ARMS. RIH W/ CALIPER & LOGGED F/ 10630-9500'. FND MIN ID TO BE 5.375" (BAD CSG F/ 10530'- 10600'). RIH W/ 5 3/4" SWG (BHA #lB) & WORK TO TOF ~ 10665'. CIRC BTMS UP. POH. RIH W/ 5 15/16" SWG (BHA #20) & WORK TO 10660'. CIRC BTMS UP. POH. 10665' TOF/ 15715' TD 14 D 11/09/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 48 SEC DAILY COST: $ 31,153 CUM COST: $ 537,911 AFE AMT: $1,035,000 RIH W/ 5 3/4" WASHPIPE (BHA #21) & WORK TO TOF $ 10665'. WASHOVER FISH F/ 10665-10672'. UNABLE TO GO DEEPER. POH. SEVERE WEAR ON MILL SHOE. RIH W/ 67' OF 5" WASHPIPE & 5 1/2" SHOE (BHA #22) & WASHOVER FISH F/ 10672'- 10723'. POH. UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D PAGE NO. LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 10812' TOF/ 15715' TD 15 D 11/10/84 9 5/8" C. 11257' 7" C. 11234' 94 PCF 47 SEC RIH W/ 189' OF 5" WASHPIPE & 5 1/2" SHOE (BHA #23). WASHOVER FISH TO 10840'. POH. RECOVERED 147' OF 3 1/2" TBG FISH IN WASHRIRE. RIH W/ BHA #23 & WASHOVER FISH F/ 10812' TO TOP OF RKR ~ 10980' DRM. CIRC BTMS UR. ROH. DAILY COST: $ 35,817 CUM COST: $ 573,728 AFE AMT: $1,035,000 11219' PBTD/ 15715' TD 16 D 11/11/84 9 5/8" C. 11257' 7" C. 11234' 96 PCF 45 SEC DAILY COST: $ 32,810 CUM COST: $ 606,538 AFE AMT: $1,035,000 11219' PBTD/ 15715' TO 17 D 11/12/84 9 5/8" C. 11257' 7" C. 11234' 96 PCF 49 SEC CONT POH W/ BHA #23. RECD 119' OF 3 1/2" TBG FISH IN WASHPIPE. RIH W/ ROLLING DOG OVERSHOT ON 5" WASHPIPE. WASHOVER FISH TO 10980'. POH RECD REMAINING 72' OF TBG FISH. RIH W/ 10 STS OF 2 3/8" TBG ON 3 1/2" DP. CIRC DN TO 11071'- COULD NOT GO DEEPER. CIRC BTMS UP. POH. RIH W/ 5 15/16" SWG (BHA #12 PR). WORKED TO PKR 8 10980' DPM (TIGHT SPOTS 8 10531' & F/ 10756-10980'). POH. RIH W/ PKR BURN-OVER ASSY (BHA #13 PR). BURNED-OVER PKR. POH. RECD PKR. RIH W/ HOWCO 7" RTTS. DAILY COST: $ 34,999 CUM COST: $ 641,537 AFE AMT: $1,035,000 11219' PBTD/ 15715' TD 18D 11/13/84 9 5/8" C. 11257' 7" C. 11234' 95 PCF 42 SEC DAILY COST: $ 37,883 CUM COST: $ 679,420 AFE AMT: $1,035,000 SET RTTS ® 9985. TST ANN TO 1500 PSI - OK. RELEASED RTTS. POH. RIH W/ 5 7/8" BIT (BHA #26). CO FILL F/ 11,015 - 11,055. COULD NOT WORK DEEPER. POH. RIH 5 1/4" SWG. WORKED SWG F/ 11,055 - 11,072'. COULD NOT GO DEEPER POH. kECEiVED UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D PAGE NO. LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 11219' PBTD/ 15715' TD 19D 11/14/84 9 5/8" C. 11257' 7" C. 11234' 96 RCF 46 SEC DAILY COST: $ 31,372 CUM COST: $ 710,792 AFE AMT: $1,035,000 11219' PBTD/ 15715' TD 20D 11/15/84 9 5/8" C. 11257' 7" C. 11234' 95 PCF 41 SEC RIH W/ 5 1/2" FLAT BTM MILL (BHA #28). MILLED THRU TIGHT SPOT F/ 11,068 - 11,075'. RIH TO RBTD @ 11,226'. CIRC BTMS UR. CLOSED HYDRIL & RUT 1500 PSI ON ANN - 7" X 9 5/8" ANN CLIMBED F/ 375 PSI TO 640 PSI IN 20 MINUTES. BLED OFF PRES. POH. RIH W/ 5 7/8" FLAT BTM MILL (BHA #29). COULDN'T WORK BELOW 11,059'. ROH. RIH W/ 5 3/4" SWG (BHA # 30). WORKED TO PBTD 11,223' DPM. POH. RIH W/ 5 15/16" SWG (BHA 31). WORKED THRU TIGHT SPOTS 8 ll,070 AND 11,152', TAG RBTD ~ 11,223'. CIRC BTMS UR. ROH. RIH W/ HOWCO MODEL N RBR. DAILY COST: $ 31,384 CUM COST: $ 742,176 AFE AMT: $1,035,000 11219' PBTD/ 15715' TD 21D 11/16/84 9 5/8" C. 11257' 7" C. 11234' 92 PCF 38 SEC DAILY COST: $ 39,299 CUM COST: $ 781,475 AFE AMT: $1,035,000 11222' DPM/ 15715' TD 22 D 11/17/84 9 5/8" C. 11257' 7" C. 11234' 90 PCF 36 SEC DAILY COST: $ 72,158 CUM COST: $ 853,633 AFE AMT: $1,035,000 SET RBP ~ 10,181' DPM. PRES TST TO 1500 PSI - OK. SPOT 15 SXS OF 12-20 SD ON TOP OF RBP. WASH DOWN TO 10,140' & REV OUT. POH. RU GO. RIH & PERF F/ 10,131' TO 10,133' ~ 4 SPF. POH. RD GO. RIH W/ RTTS & SET ~ 9898' DPM. RU BO & TEST LINES TO 8000 PSI - OK. ATTEMPT TO BREAKDOWN PERFS W/ 6500 PSI- NO BREAKDOWN, NO PRES INCREASE IN 7" X 9 5/8" ANN. BLED OFF PRES. POH. RIH W/ RBP RETRIEVING TOOL. WASHED DOWN & LATCHED ONTO RBP ~ 10,181'. POH. RIH W/ 5 15/16" SWG. WORKED THRU TIGHT SPOTS ~ 10,655', ll,051' & 11,073' & TAG PBTD ® 11,222' DRM. CIRC 2 FULL CIRCULATIONS. ROH. RU & RN 5" LINER W/ FS ON BTM, FC i SNT UP - TOTAL LENGTH 1129.52'. RN CSG TO BTM & CIRC RIPE VOLUME. BACK RUNNING TOOL OUT OF HGR. RU BO & TEST LINES TO 5000 PSI. ,,ECEJVED D;: c 0 1985 A!aska Oil & Gas Cons. Commission Anchorag~ UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D PAGE NO. LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STAT~ MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 11222' DPM/ 15715' TD 23 D 11/18/84 9 5/8" C. 11257' 7" C. 11234' 5" 10,092 - 11,222' 90 PCF 35 SEC DAILY COST: $ 25,026 CUM COST: $ 878,659 AFE AMT: $1,035,000 11220' ETD/ 15715' TD 24 D 11/19/84 9 5/8" C. 11257' 7" C. 11234' 90 PCF 35 SEC DAILY COST: $ 27,847 CUM COST: $ 906,506 AFE AMT: $1,035,000 10,095 TOF/ 15715' TD 25 D 11/20/84 9 5/8" C. 11257' 5" L. 10,092 - 11,222' 7" C. 11234' 90 PCF 35 SEC DAILY COST: $ 24,998 CUM COST: $ 931,504 AFE AMT: $1,035,000 11,219 ETD/ 15715' TD 26 D 11/21/84 9 5/8" C. 11257' 7" C. 11234' 5" L. 10,092 - 11,222' 95 PCF 47 SEC DAILY COST: $ 31,885 CUM COST: $ 963,389 AFE AMT: $1,035,000 CMTD 5" LINER W/ 127 SXS CL 'G' CMT W/ ADDITIVES. DISP W/512 CF OF MUD. BUMPED PLUG W/ 2000 PSI. CIP ~ 0100 HRS, 11/18/84. POH. RIH W/ 6" BIT & 7" CSG SCRPR. WOC UNTIL NOON. TAG CMT $ 9653'. DRLD STRINGERS & SOFT CMT TO 9750'. DRLD HARD CMT TO TOL $ 10,092'. CIRC BTMS UP. RIH W/ HOWCO RTTS & HYDRASPRING. SET RTTS ® 10,055' & OPENED HYDRASPRING. WAIT 30 MINUTES. CLOSE HYDRASPRING. POH. CONT POH W/ TST TOOLS. FND i STAND WET - INDICATES LINER LAP GOOD. RIH W/ 4 1/8" BIT & CO CMT 8 LINER TOP F/ 10,096' TO lO,lO5'. RIH & DRLD CMT F/ 11,194' TO LC 8 11,206'. RIH & DRLD CMT F/ 11,210' TO 11,220'. CIRC BTMS UP. POH. RIH W/ 5" CSG SCRPR TO PBTD 8 11,220'. CIRC BTMS UP. POH. RU GO WL. RIH W/ OB & 4.15" GAUGE RING TO 10,287' (HAD DIFFICULTY GETTING THRU HGR ASSY). POH. RIH W/ GR - CCL & LOG TO BTM. POH. GR OF GOOD DEFINITION & ABLE TO COORELATE W/ OPEN HOLE LOGS. RIH W/ lC' 3 3/8" PERF GUN. COULD NOT WORK BELOW 11,168' (GR DEPTH) - BTM ZONE F/ 11,192' TO 11,222'. POH. RIH W/ OB & 2 SINKER BARS. COULD NOT GET BELOW 11,168'. POH. RIH W/ 4 1/8" BIT & 5" CSG SPRPR. RN TO BTM W/NO DRAG. POH - FND 4 1/8" BIT MISSING. RIH W/20' PERF GUN - COULD NOT GET BELOW 10,095' WLM-BIT STUCK IN LINER HGR. POH. RIH W/ 4" FISHING MAGNET & 2 SINKERS BARS. MAGNET STOPPED ® 9600'. POH. RIH W/MAGNET & 3 SINKER BARS. WORKED MAGNET ON LINER TOP. WORKED MAGNET ~ 10,098' WLM. POH-NO RECOVERY. RIH W/ 3 3/8" PERF GUN & TAG BIT ~ 10,103' WLM - CCL INDICATES BIT IN LINER HGR. POH. RIH W/ 3 1/2" DP, W/ BOTTOM SNT PIN CUT OFF & WORK BIT THRU HGR. POH. RIH W/ 5" SCRPR (BHA #36) & PUSH BIT TO BTM ~ 11,216' CIRC & COND MUD. RECEIVED A!aska Oil & Gas Cons. Oomm~s~,or~ Anchorage UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D RAGE NO. LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 11,216 ETD/ 15715' TD 27 D 11/22/84 9 5/8" C. 11257' 7" C. 11234' 5" L. 10,092 - 11,222' 82 RCF 37 SEC DAILY COST: $ 32,815 CUM COST: $ 996,204 AFE AMT: $1,035,000 11,216 ETD/ 15715' TD 28 D 11/23/84 9 5/8" C. 11257' 7" C. 11234' 5" L. 10,092 - 11,222' 95 PCF 39 SEC DAILY COST: $ 32,768 CUM COST: $1,028,972 AFE AMT: $1,035,000 11,216 ETD/ 15715' TD 29 D 11/24/84 9 5/8" C. 11257' 7" C. 11234' 5" L. 10,092 - 11,222' 89 RCF 38 SEC DAILY COST: $ 38,347 CUM COST: $1,067,319 AFE AMT: $1,035,000 11,216 ETD/ 15715' TD 30 D 11/25/84 9 5/8" C. 11257' 7" C. 11234' 5" L. 10,092 - 11,222' 98 PCF 33 SEC DAILY COST: $ 128,630 CUM COST: $1,195,949 AFE AMT: $1,035,000 ATTEMPTED TO SCREW INTO LOST 4 1/8" BIT. POH- NO RECOVERY. RU GO WL. PERF F/ 11,186' TO 11,212' & F/ 11,125 TO 11,145' DIL G 4 SRF. RIH W/ 4 1/8" BIT & 5" CSG SCRRR TO CO RERF DEBRIS. CIRC G 11,216' DPM. POH. RU GO WL. RIH W/ 25' 3 3/8" PERF GUN - COULD NOT GET BELOW 11,050'. POH. PERF F/ii,il0' TO 11,121', F/ll,050 TO 11,075', F/10,841' TO 10,851', F/10,815' TO 10,825', F/10,735' TO 10785', F/10,660' TO 10,705' 8 4 SPF. PERF F/10,535' TO 10,635'. RD GO WL. RIH W/ 5" CSG SCRPR TO 11,216'. CIRC & COND MUD. SI & DP PRES BUILT TO 300 PSI IN 45 MINUTES. BUILT MUD WT TO 93 PCF. SI & DP PRES BUILT TO 1020 PSI (107 PCF EMW). CIRC & BUILT MUD WT. POH. RU GO WL. RIH W/ OTIS 5" WB PROD PKR & SET 8 10158' WLM. POH. RD GO. RIH W/ SEAL ASSY & LOCATOR. STABBED INTO PKR 8 10151' DPM & TST PKR - OK. CIRC & COND MUD. POH & LD DP. Aritho' age UNION OIL COMPANY OF CALIFORNIA WELL RECORD SHEET D PAGE NO. 10 LEASE UNION - MOBIL STATE #1 WELL NO. GRANITE POINT STATE MUCI #1 FIELD GRANITE POINT DATE ETD DETAILS OF OPERATIONS, DESCRIPTIONS & RESULTS 11,216 ETD/ 15715' TD 31 D 11/26/84 9 5/8" C. 11257' 7" C. 11234' 5" L. 10,092 - 11,222' 98 RCF 33 SEC DAILY COST: $ 187,956 CUM COST: $1,035,000 AFE AMT: $1,035,000 11,216 ETD/ 15715' TD 32 D 11/27/84 7" C. 11234' 5" L. 10,092 - 11,222' DAILY COST: $ 38,878 CUM COST: $1,422,783 AFE AMT: $1,035,000 RU & RN 314 STS 3 1/2" 9.2# N-80 BUTT TBG W/ 18' OTIS SEAL ASSY (TOTAL LENGTH 10,130.07'). LANDED TBG IN HGR. TST TBG TO 1200 PSI - OK. INSTALL BRV. ND BORE, NU & TST WELLHEAD. RU MYERS WL. RIH & REMOVE BPV. 1020 PSI ON TBG, 0 PSI ON ANNULUS. MIXED PKR FLUID (1 GAL NALCO 3656 & 10 GAL NALCO 933 PER 350 BBL H20). RIH & OPENED X-A SLEEVE. PUMPED 50 BBLS H20 & 500 BBLS PKR FLUID DN ANNULUS. RIH & CLOSE X-A SLEEVE. RD MYERS. FLOWED WELL TO MUD TANKS ~ 4 BBLS/ HR. RELEASED RIG @ 2400 HRS, 11/27/84. Form D-lOO1-A UNION OIL CO. OF CALIFORNIA REPAIR RECORD SHEET A Page No. i LEASE Union-Mobile State #1 WELL NO. MUC I-1 CONTRACTOR Conservative Drilling FIELD Granite Point LEASE # ADL-18761 TYPE UNIT Wilson 120 H BEGAN 10/27/84 COMPLETED 11/27/84 ELEVATIONS: GROUND PERMIT NO. _~69-9 SERIAL NO. 50-733-20173 CASING HEAD COMPANY E~I~ER Te~ ian_ _ _ TUBING HEAD APPROVE~~Z~_~,__~. ~ ~.,~'_~,"~_~_.~?_..,~_.,,~ ROTARY DRIVE BUSHING 106' MLLW CASING & TUBING RECORD SIZE DEPTH WEIGHT GRADE REMARKS 13 3/8" 5973' 61# 0-55 Butt Window $ 5628' ,, 5/8" l125Y' 40#, 43.5#, 4Y# N-80, N-80, S-95 Butt 11234' 23#, 26#, 29# N-80 Butt, Butt, X-Line 5" 11222' 18# N-80 Butt & ABFL4S 3 1/2" 10218' 9.2# N-80 Butt Cmtd w/ 250 sx "G" cmt Liner Hanger $10092' Cmtd w/ 127 sx "G" (see detail) Otis 5" WB Pkr ® 10151' PERFORATING RECORD DATE INTERVAL E.T.D. REASON PRESENT CONDITION 11/16/84 11/22/84 11/22/84 11/23/84 11/23/84 11/23/84 11/23/84 11/23/84 11/23/85 11/24/85 11186-11216' 11100-11145' 11050-11075' 10841-10851' 10815-10825' 10735-10785' 10660-10705' 10535-10635' lO131-10133' 11186-1i212' 11125-11145' llllO-11121' 11050-11075' 10841-10851' 10815-10825' 10735-10785' 10880-10705' 10535-10635' For Injection For Injection For Injection For Injection For Injection For Injection For Injection For Injection Isolation Sqz-no breakdn For Injection For Injection For Injection For Injection For Injection For Injection For Injection For Injection For Injection Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Cemented behind 5" liner Open Open Open Open Open Open Open Open Open INITIAL PRODUCTION AFTER REPAIR DATE INTERVAL NET OIL CUT GRAV. C.P. T.R. CHOKE MCF GOR REMARKS Injection Well WELL HISTORY PRIOR TO REPAIR COMPLETION DATE: 2400 HRS~ 11/27/85 PRODUCING INTERVAL: LAST COMPLETION NO. INITIAL PRODUCTION: Injector LAST REGULAR PROD. & DATE: CUMULATIVE PRODUCTION: REASON FOR REPAIR: To repair a tubing leak and restore injection RECEIVED ., D 0'' ~laska Od & Gas Cons. Commission Anc~mrage iH~ITUhl FIll I_i.~A']F: ~ll,lr,.FllI-Nl]i..'.ll .%1-{'~'I'I.-: 'HI I,:4EI I I'lr).; IILI~'; I 1 I: I1:1 .I.): 1'" "/8" CAS1NG t'~l_ 1"AIl ,] T'.:,. L)ESC[,.' L I" r 1 L'~i"I LiD X 1 L,'. .. 6 J..}-] ,t _,..-r--,.~,.. [{Ij F It d_SS _. N] NE)OW CLII A F L'-';;.'~2LI' I F I',.1(~111 I)F..:F",I,I I I I-:' I '~ ) ri'IT I-:() t ] (ll,I I F.)I-' I i/~ Itl · ,, ;~ I_I_-'.I,IG I'II I-;O-F Ir)Il 1 I_ll' 49._.5'"_, ,, F)()"1- 9 ~" . O, ~ (.~11r<l ~' , CI: -,' ~, r'] 9 ~, J c)'2~.':.)~) ] l'2'J/.Or) / L I"I',H] Iii L':L]I Ii iii F(.)I' 6,",9 3.0() 'J '1V ".(")(.) 9:1 <-I<'.:' . ( )( ~ 66V'."; (.)0 ?",":,'18.0,.:, I I ,"3/I ,, , l ] S. L]" i_]lql(l( ~)l'[,"ill Ill') / J i) I 1-1:.1(]111 l~l.II II Ill I I]l' I I ",u,, (")~) I I 2..' ',, (~) l()(,'?,', ,.ECEiVED o u l g'5 ~Jaska O~l & Gas Cons. ¢omm. issior] Anchorag9 LINI~31q 1311. ~,1 II I I I 'Cfi;l. I:.lf},, I.I-F~-;E:: tJhltFtl',l-I',ILJ;Z, rl c;Ir'..'~rl£ ff:l I,;iLLI 1. I,Ii'~, :: hltJ[' ] -1. I IE-.I.D:: I;l(f~tll IL I"'iJ1 bi I ~J fF;. 1:,I2~ ,t ,I ,: .I I ' I i ~ H/I lelfF-I,I I-[~'/ r;tll DF: ,'; '5/~;" r~.LI1 l X I',.lil'l'l fZ ," 3/fl" I;IITI' F'tII' xf] ; : I /.,'" f-{!J FT- ,.' ', J/2" Idll t" I'~ Xt] (t-,I"{~L ]'.:t Jl'(l-_ --' ~.;t.¢~l uOl,1 tZ;:,; Fl-iqL,.[!]l,i t;t 11',lh. ll- t' I LH ,' 'i" r}ll% !,,ll'i I'-'E"I"~'I',I F'I I';' (JI;, X Il) ¥...,'t I i I~ Alaska Oil & Gas Cons. Commission Apchorag.J i i i W£LL GP$ MU(: I-1 CASING & ABANDONMENT DETAIL' L) Kelly Bushing at 0.00' ! II.) OCT Tubing Hanger at 38.00' , : I. LL) 13 318', 61~, J-55 Casing &t 5973' with Window at 5628' uJ: I ; iV.)~~.,, tSP, N-80 Liner ;~t 1Q092" V.)~!8~, N-~O Liner at 11222* Vl.~)~7~': 2~3~,26~,&29~' 1~-SQ Casing ;It ? 1234' i VII.) 9 518°: 40~,43.5~&47~- N-80&8-95 ! ~ Casing at 11257' !' TUBING DETAIL ! 3 1/2; 9.2~, N-80 TUBING & 2 3/8", 4.7~, N-80 TUBING with AB Modified Couplings ! 1.) Otis 'WB' Perm. Packer at 10151' I 2.) Seal Bore Extension at 10160' 3.) Bottom of Mule Shoe at 10176.47' ~ ! 4.) 3 112' x 2 3/8' Crossover at 10178.18° ; I 5.) Otis 'X' Nipple at 10191.54" i i [ 6.} Wireline Re-entry Guide at 1:0224.01 I PERFORATION RECORD DA TE INTERVAL CONDITION' : 111818,5 1'1'186'-11212" Open C Zone Injection i 11110'-11121' i 3 11050'-11075' 4 5 ! 10841'-10851' Open B Zone Injection 6 B ZONE , lO~5'-~os25' 10735'-10785' · C ZONE 10660'-10705' V 10535'-10635' Note: All perfs 4HPF, DIL Depths · VII __~ __ 12," C 0 ~, Anch0r~J3 REV. ~ DATE _ DRAWH BHE C~<O. ~ APP'D. NONE WELL GPS MUC I-1 WELL SCHEMATIC iii i i i i UNION OIL COMPANY OF CALIFORNIA ANCHORAGE, ALASK& SHEETS I SHEET FORM V 247 A 5/56 750 MUC- I 13 I!, 12 II I0 2'- 8 4 $ ! f 1 I 1 .11 2 Wellhead Equipment Division Houston PARTS LIST 3" Completion Muc- 1 TREE NO. ITEM PART NO. 10 11 12-130-040 90-010-220 26-190-087 13-300-240 14-010-617 90-010-620 14-630-* 26-190-060 82-020-462 02-042-904 90-030-831 722 SIZE WORKING PRESSURE DESCRIPTION Casing head 26" OD buttweld x 24¼" 1000 WP calmp hub Valve, FE, FMC Model 20 2" 2000 WP Trim R Clamp, OCT 2 bolt 24¼" 1000 WP Casing head, 24¼" 1000 WP clamp hub bottom x 20¼" 2000 WP W/2 2" 2000 std outs Unihead, UH, type II 13-3/8" OD buttress x 13-5/8" 5000 WP clamp hub, W/w w" LPO Lower section, W/2 2" 5000 std outs upper section Valve, FE, FMC Model 20 2" 5000 WP, trim R Tubing head, U-00, 7" OD, 13-5/8" 5000 W! clamp hub btm x 7-1/16" 5000 WP W/ 2 2" 5000 WP std outs Clamp, OCT 4-bolt 13-5/8" 5000 WP clamp with studs & nuts Tubing hanger, U-30, 6"x 3.5"OD buttress top & bottom, W/IS BPV groove, W/DHCV port Adapter, A-4, 7-1/16" 5000 WP x 3-1/16" 10,000 WP bored for E.N. hanger Valve, F.E. FMC, Model 30, 3-1/16"10,000 WP, Trim S UNIT PRICE TOTAL PRICE Page 2 Wellhead Equipment Division Houston PARTS LIST 3" Completion Muc- 1 TREE NO. ITEM 12 13 PART NO. 25-021-419 02-240-078 722 SIZE QUAN. WORKING PRESSURE DESCRIPTION UNIT PRICE TOTAL PRICE Cross, C-600, 3-1/16" 10,000 WP x 3-1/16 10,000 WP Adapter, B-11-AO, 3-1/16" 10,000 WP W/ 3% EUE 8rd lift thd RECEiVF D~C 0~ Nasl~ Oil & Gas -----.~ ~ Anchorafi9 SUBSEQUENT REPORT OF REPAIRING WELL MUC I-1 January 21, 1971 12/29/70 - 1/7/71 Located leak at 5961'. Squeezed leak with 145 sax Class G cement. Maxirnurnpressure 3500 psi. WOC 21 hours. Tested squeeze job and had breakdown at 1750 psi. Resqueezed leak at 5961' with 191 sax Class G cement. Maximum pressure 5000 psi. WOC 27 1/2 hours. Located top of cement @ 5837' and tested casing 5837' to surface with 3000 psi, OK. Drilled out cement and tested. Squeeze broke down at 3000 psi. Resqueezed with 165 sax class G cement with 1% CFR-2. Final pressure 5000 psi. WOC 36 hours. Drilled out cement and tested. Squeeze broke down at 3150 psi. Resqueezed leak with 200'sax Class G cement. First 100 sax containing .3% Nalad 9 and last 100 sax w/6#salt and 6# frac sand per sack of cement. Final pressure 4750 psi. Drilled out cement and tested squeeze job to 3000 psi, OK. 1/8-10/71 Circulated sand off bridge plug and recovered bridge plug at 6335'. Drilled out cement 6425/6535. Set seal assembly in packer at 10,470' and tested casing from 10,470' to the surface with 3000 psi, OK. Ran tubing and cleaned out to 11,236'. Washed all perforations with 2000 psi. 1/11-12/71 Ran 352 joints 3 1/2" 9.2# buttress tubing and landed with 18' of seals in packer at 10,470' and 23' of seals in packer at 10, 970'. Bottom of tubing at 11,002'. Otis X-O sleeves at 10,960', 10,523' and 10,468'. Displaced salt water in annulus with 660 bbls inhibited sodium bichromate water 8.5#/gal, ll+pH. Landed tubing with 15,000# on the top packer. Tested annulus with 3000 psi, OK. Instal[ed Xmas tree. Released rig @ 12 midnite 1/12/71 and commenced water injection. DIVISION OF OIL AND GAS ANCHORAGI~ DI ECTIiOi AL SURVEY FOR MOBIL OIL CORPORATION E PORT SP-135C ~YPE OF SURVEY' Surwel Gyroscopic Multishot %6oo SURVEY DEPTH: FROM , FT. TO LEASE~ Granite Point ~JC FIELD: ,,~ ~O,ranite Point 11,150 1 WELL NO. COUNTY/PARISH, Kenai DATE OF SURVEY ~pril 13~ 1969 OFFICE: Anchorage, Alaska JOB NO, Alaska STATE SU-3-16439 :MOBIL OIL CORPORATION PAGE 1 ' ......... · 'GRANITE POINT STATE MUC-I .................................................... 4-13-69 .................. SURVEY DATE -- .......... · 'GRANITE POINT VERTICAL SECTION COMPUTED ALONG CLOSURE ALASKA SPERRY-SUN_WELL_SURVEYING COMPANY SU-3-16439 RECORD.. OF. SURVEY ......... TRUE ...... INCLINATION MEASURED VERTICAL SEVERITY VERTICAL DEPTH ..... DEPTH ...... DEG MIN ........ DEC . __ DEC/lO0 ._ SECTION .... ...DIRECTION .... DOG-LEG ......................... RECTANGULAR COORDINATES ...... .750 769 ..... 784 · 5600 ...... 4989.02 ........... TAKEN..FROM.~SU-3~16425 5700. 5082.22 21 I5 N 60 E 0.00 2271.07 ......... 5800 ..... 5175.57 ........ 21_ 0 .... N 65 E ........ 1.81 RTH __ SOUTH EAST _ _ WEST ..... · 98 ........ 2154.31. · IO 2185.69 · 24 ....... 2218.I7 .............. 5900 ....5267.79 6000. 5360.67 6100. __, 5454.49, 6200._ 6300. 6400. 6500 6600 6700 6800, 6900. 7000, 22. 45 ...........N_68 E ..... 2.07 .... 2344,93___ 798,73 21 45 N 67 E 1.06 2381.64 813.21 20~_15 ......... N.63._E ............2.07 ........ 2416.18 ..... 828.92 __5551.20 .............. 14_~45 ....... N_49_E ........ 6.88___2441.24 ....... 845.62 5647.08 16 30 N 43 E 2.37 2468.51 866.40 5742.19 ......... 18~_ 0 ...... N_44.E ......... 1.52 .... 2498.34 ....... 888.62 5836,30 ........... 19_45 ......... 5929.50 21 15 6021.89 ....... 22 .... 30 N 46..E ........... 1.86 .... 2531.24 ...... 912.10 N 49 E 1.83 2566.9I 935.88 _N_48_E ............ 1.30 ......2604.45 ...... 961o48 6113.25 ...... 2~_ 0 N 49_E ...... 6203.51 25 30 N 48 E 6293.1~ .......... 26_,15 ......... N,,48_,E ........ 1.55 ...... 2644.49_ 1.55 2686.72 0.74 ..... 2730.1 ] ....... ..... 988 1016 1046 2254.03 ............. 2288.14 2318.98__ 2338.19_ 2357.56 2379.03 ................. 2403.34 2430.69 2459.13 .... · 17 ............. 2489.82 · 97 2521.82 · SZ.._ 2554.69 7100 7200. 7300 ..... 7400 7500. · _ .__ ~'"'"7800: 7900. 6381.28 28_15 6468.95 28 45 6556.63 ...... 28_45 N~50.._E ......... 2.19 ..... 2776.84 ........ 1076.99 N 50 E 0.49 2824.32 1107.91 N.51_ E .......... 0.48 ..... 2871.93 ..... 1138.18 6644.09 ............. 29 ..0 ..........N 52 E ....... 0.54 ..... 2920.03 ....... 1168.03 6730.91 29 45 N 53 E 0.89 2969.36 1197.89 6817.07 ........ 30 ~0 ............. N_SZ_E ....... 0.90 ...... 3019.72 ......... 1229._14 2590.94 2627.79 2665.17 2703,37 2743.00 2783.00 _.6901.41 _.32 .... 30 ..........N 52_E ............2.00 ...... 3073.03____ 1262.22 6984.07 34 15 N 53 E 1.83 3128.98 1296.09 ._7067.94 ........... 33_ 0 ...... N 52. E ......... 1.36 ......3183.02 ...... 1329.62 ........ _2825.34 .... 2870.29 ..... 2913.20 ................... RAN~TE POINT._.STATE_MUC__I RAN!TE PO!NT LASKA __ _ PAGE 2 .......... 4~13-69 ................ SURVEY DATE '. VERTICAL SECTION COMPUTED ALONG CLOSURE SPERRY_-SUN_WELL_ SURVEYING_COMPANY ....................... SU- 3-_16439_ .................... RECORO_.OE. SURVEY ...... TR ASURED VERT DEPTH ...... DE 8000 ..... 7153 8100. 7238 8200 ....... g323 UE ....... I NCL I NA.T ION __O I REC_T I ON .... DOG-LEG .... ICAL SEVERITY PTH ......... DEG.MIN ....... DEG __ _DEG/100_._ VERTICAL RECTANGULAR COORDINATES ..... NORTH .... SOUTH__ EAST __ WE_ST___ · 20 ........... 31.30 .69 31 15 · 73 ........... 31_A5 .SEC!_I ON. N_Si.E ....... 1.59 _.3234.74 ...... 1362.50 ........... 2953.81 N 50 E 0.57 3285.95 1395.85 2993.55 N~49__E ......... 0,72__ __3337,.74 ..... 1430,37 ......... 3033.26 8300. _7407.83 ............... 32. 45 N_50_.E ........ 8400. 7490.49 34 15 N 50 E 8500 ...... 7573.15 ....... 34__15 ....... N_49_.E ........ 1.13 3391 · 15 ..... 1465.14 3074.70 1.50 3446.71 1501.32 311f.82 ~ O. 56 .... 3502.10 .... 1538.24__ 3160.29~ 8600 ....... 7655.06 8700. 7736.22 8800. 7818.39 35__0 N_49 E 35 45 N 48 E 34 45 N 48 E 0.74 .... 3558.56 ..... 1575.87 ........ 0.94 3615.87 1614.97 0.99 3671.79 1653.11 .3203.58_ 3247.00 3289.36 8900. .... 7900 9000. 7982 9100 ....... 8067 9200 ..... 8154 9300. 8241 9400 ......... 8327 · 05 ....... 35__15 · 71 34 15 . 97_ ........... 31__30 · 58 30_ 0___ .40 29 45 · 34 ........ 30_.45 N_.45..E ......... 1.79 ..... 3727.75 ..... 1693.92 N 46 E 1.15 3782.55 1733.01 ..~__45_E ......... 2..80 .... 3833.21 ......... 1769.96 N 45_E ........ 1.50 ...... 3881.68 ...... 1805.32_ N 45 E 0.24 3929.79 1840.40 N..51~E .......... 3.18 .... 3980.40 ..... 1872.58 .... 3330.17 3370.65 3407.60 3442.96 3478.04 3517.78~,=.. 9500 9600 9700 9800 9900 0000 0100 O2OO 0300 ....... 8415 · 8506 . 8598 · 01 28.45 ........... N~_49_E .......... 2.23 .... .89 23 15 N 46 E 5.65 · 94 .......... 23__ 0 ......... N 45.E .......... 0.46__ 4027.74 ..... 1904.14 ............ 4066.18 1931.56 4104.06 ......... 1959.19 ..... 3554.08 3582.47 3610.10 ...... 8691 · 8784.83 . 888b.o7 .... 8976 . 55 ...... . 9073.25 ..... 9170.69 .16 ....... 22..45 ........... N~45._E ....... 0.24 .... 4141.55 ......... 1986.53 ............ 3637.45 20 30 N 42 E 2.50 4175.01 2012.56 3660.88 1~__45 ..... N~..41.E ........ 2.76 ..... 4203.98 ....... 2035.56 3680.88 15__15 ........... N_42. E 2.51 4229.11 14 45 N 43 E 0.56 4253.56 13. 0 ......... N.39 .E ............ 1.99 .... 4274.67 ...... 2055.11v_ ........... 3698.48 w/ 2073.73 3715.85 2091.21 .......... 3730.00 ...... MOBIL OIL CORPORATION ~AGE '3 GRANITE POINT-STATE MUC 1 ............................................... 4-I3-69 GRANITE POINT VERTICAL SECTION COMPUTED ALONG CLOSURE ALASKA ................................. ~ ......... ~ I ................................ SPERRY-SUN WELL SURVEYING COMPANY RECORD.OF_SURVEY ............................. TRUE '--INCLINATION ...... DIRECTION DOG-LEG ..................... RECTANGULAR.COORDINATES MEASURED VERTICAL ' -- SEVERITY VERTICAL ............ DEPTH .._ DEPTH ...... DEG MIN _] ...... Z._DEG ...... DEG/iO0. SECTION ...... NORTH ._ SOUTH. EAST _ WEST 10400 ..... 9268.12 .............. 13 ...6 ........ N 38_E ....... 0.22 .4295.65 ..... 2108.94 ........... 3743.85 ....... 10500. 9365.66 12 45 N 33 E 1.14 4315.45 2127.45 3755.87 .10600. ..9463.09 k13.. 0 ......... N.29_E .......... 0.92 ~_4334.90 ..... 2147.1Z ....... 3766.78 10700._ _. 9560 10800. 9656 10900 ........ 9753 · 02 .......... 14 15 ..... N 29 E .......... 1.24___ · 83 14 30 N 23 E 1.50 · 97 ............ 13__45 ....... N~ZO..E 1.04 4356.18 ...... 2168.65 4376.39 2191.70 4394.81 ..... 2214.04 .............. 3778.71 3788.49 3796.62 11000. __9851.50 .......... 12_ 45 ..... N 1.4_E ......... 1.69 .... 4410.37 .... 11100. 9948.64 13 45 N 8 E 1.69 4425.27 11150 ....... 9997.10 ............ 14.15 .......... N_ 7__E ......... 1.11~ _4432.82 2235.45 ............... 3801.96 2258.99 3805.27 ....... 2271.20 .............. 3806.77__._~"~_ THE CALCULATION ~R6C~E6~'~"A~'~'ASED ON THE USE OF THE TANGENTIAL OR CHORD METHOD HORIZONTAL DISPLACEMENT = 4432.82 FEET AT NORTH 59 DEG. 10 MIN. EAST(TRUE) :- FOR MOBIL OIL CORPORATION ......... I I I , Il 3 Surwel Gyroscopic Multishot Directional TYPE. OF SURVE'Y' SURVEY DEPq'H: FROM 300 _ ~v. TO 5970 MUC Granite Point 1 LEA~E: .WELL NO. Granite Point FIELD: Kenai Pen. Bot. COUNTY/PARISH February 18, 1969 ~%TE OF SURVEY OFFICE: Andhorage, Alaska Alaska . .. STATE SU-3-16425 JOB NO._ _ C IYl~iON OF O!t ~D O," S AK~IOW, Oe .......... NU¢-.,1. .... GRAN]TE PO]NT .ALASKA ~_ VERTICAL S£CTION COMPUTED ALONG CLOSUR5 ' S P_E RRY_-._S UN _W E L L_ S UR.V E Y_LN G_C 0 M P ANY I S U-__3_-_1.6 z~ 25. _____RECORD__OF_ SURVEY. _TRUE____ I N C LI.NA_T.I ON __DLR E C_T_I 0 N__DOG-..L EG MEASURED VERTICAL DER.TH ...... D E P_T .H_ . DE.G _M_I.N___.__D.E G_ ........ ,_.30_0..___ 299_. 9.5 ........ SU=3=1.6..4.1.2 400. 399.87 2 I5 N 73 W ....... 500 · 49.9 · 82 1..__4.5 ___N_I.g__E __.600 ..... 599..63 700. 699.13 _ 800 ....... 798.22 SEVERITY VERTICAL DEG/.' 1 O0 .... SEC_T_I_ON,, 0.00 -6.75 2_. 8.9 -4_..8 5 ...... R. EC.T_ANGU LA~__C O0 R D_I N A_T_E S .... · NOR_TH SOUTH' _.EAS_T____WE_S . _3 30 ..... N_3_7__E. I_..Q1 ......... 0.23 5 45 N 57 E 2,73 9,97 _7_.4.5~ ....... N._7.4._E ......... 2., .8 0 .... 2 3.,.4 3 0,65 .___~_._54 8_-_4_ 2 13,87 _.1.7...59. -.6.. *' 5.67 8.,,.6 3 ....... 9_0.0.. 89 6_. 7_0 1000. 994.04 __i_100. I090..04 1200 .____I184.16 1300. 1276.04 1400.__.1365.34 ___ 1.500 .___.17 52 · 3? 1600. 1536.94 __1700 ..... 1618.86 ___I800.___ 1697. .1900. 1773. . i~?~__~. _~._.2000 ,__,1.849_. 2100 ..... 1927 . 2200. 2300 · !0__0 N_ 7_7._E__ 13 15 N 79 E i_6__I..5 .... N 80 E 2500 · _2600 · 23 15 · 2.6 45 2.. 2_9 40.. 68______2_1_:_5_0 3.27 63.36 25.87 3...01 90_.~ 9_6 30.73 58.05 8 . N._ 83_. E_____L 3...6 l___._l. 23.. 96 N 80 E 3.66 162.89 N 80 E 3_._.50~2P.7_._2_9 2~_~0_ 32 15 _3_5.__0. 41.70 _119 ._15 158.02 _2D2_.~35 N._80._E 2...74 255...87 N 80 E 2.74 308.50 N.79.. E ..... 2...80__.__365.24 39 ........ 38__15____ _ N_80 _E 72 40 15 N 81 E .76 40__3_0 N 80 E 5.8.:_07 67,33 _7_8.._2.8 , 250.85. .... 303.40'"' ____3 53.,..Zo _3.3 0________~426 . 31__~.89_.D B__ 2.09 489.85 99.14 0_..69 553.9 ~_.: !! 420.6_7 484.49 548.44 19 ..... 39 __15 ........ N_.79._ E______I_. 40 ...... 616 . 4.9 2005.18 38 45 N 79 E 0.49 678.41 .... 208?..25 37_.4_5 N 78 E 1_..1.7__~_._%3_9.11 ,.1_.22 ,.49 6.10...55 I34.43 671.99 __14ff.._.16 731.88 - -. 2164..90 __36 I5 N___78~..E 1_..4.9___7_97..7_4_._.__159.45_ 78%._7_2 2246.81 35 0 N 78 E 1.25 854.62 171.38 845.82 232 9.22 ........ 34,. 30 ...........N._.7.8.. E. ......... 0 ._4.9 .... ._910 ..78 ......... 183..: 15 ..... .9.0 !.-. 22 MOBIL OIL CORPORATION MUC-I GRANITE POINT __ALASKA . Z-18-69 .... SURVEY -DATE .... VERTICAL SECTION CONPUTED ALONG CLOSiJRE SPERRY=SUN,WELL_.SURVEYING-COMPANY RECORD.OF..~URVEY SU-3-16425 3RUE .... MEASURED VERTICAL DEPTH .... DEPTH 2700. _..2413.80 2800. 2499.51 2900.~__2585.45 3000 .... 2670.49 3100. 2755.53 3200 ..... 2840.56 .... .INCLINATION .... DIRECTION._DOG-LEG-- SEVERITY VERTICAL ...... DEG_MIN _DEG ..... DEG/IO0 ..... SECTION __RECTANGULAR _COORD I NAT ES __ ..... NORT. H .... SOUIH .... EAST ....... WES ..... 32 ..15. 31 0 30_45 ..... 31_45 31 45 _31 ..45 ........ ....... N..76.F .,2.50 ...... 963. N 69 E 3.87 1015. .N..68_E ...... 0.57___1066. __ N _66 _F N 66 E _N..66_ E ..... __.l.A4 ____1118. 0.00 1171. __0.00 .... 1223. 90 ....... 196.06 ..... ______.__953 38 214.52 ' 1001 46 ..... 233..67. 1048 92 ..... 255.08__ 1096 37 276.48 1144 83 .... 297.88 .... 1192 .00. .08 .49.. . ,v 56 .63 .31_ 3300.____2925 3400. 3011 3500 .... 3097 .3900. .... 3447 4000 · 3536 ..... 4100 ..... 3624 · 82 .....~.I._30 .32 31 15 . 26 .....30____45__ 3600.___.3184.08, 3700. 3271.96 3800.____3359.63 N_]66_ E_.-]-_],_. __, 0.. 24___127.5_~ 91 .... . N 67 E O. 57 1327.69 N ...66_E .... 0...71 .....1378...66___ 29...45 ......... N.,.6.6_F 28 30 N 66 E 28_45 --- .N..~7_E.-- j lg. IA_ ,1240.~ 339.41 1288.19 36.0...20 1339.90._ O. 9 9 ;_.._~ 428. 1.25 - 1475 · _0.. 54 .... 1523.. 13 ...... :380.38 .... 1380.23_ 69 399.79 1423.82 7_0__.__418_. 59 ' ..1_468.. 1_0_ Z-// .72 ........ 28..15 ........ N._,66_.E .01 28 0 N 65 E .10 ....... 28__15 ...... N,_65 F _0.69 _____1570. 0.53 1617. _0.. 24_____1664 . 88.~~3.7.84 61 45.7.68 72 .......... 473..68 _15.11.34___~ 1553.89 1566..78. ., 4200 ..... 3712 ~ 4300. 3801  ..4400 3891 ~ - ': · 4500 .... 3982 ~:~ ..~ ~' 4600. A073 b ~;~_ 1~ 4700 ..... 4164 ' ~' 4900~ 4347 ............. 5000. ._ 4438 .40 ..... 28 _0 ....... N_66.E, .50 27 0 N 64 E · 57 ....... 25..~5 N,_65_.E .20 .......... 25 ..0. N_63..E ........ .55 24 0 N 62 E . 73 __2_4. _15 N_.62_E 0.53. __1711.52 ..... 1.36 1756.62 1.. 32 ..... 1.799_. 86 __1.13 ..... 1841. 1.08 1881. ___0.24 ...... 1922. · 91 .... 24__15 N__63..E .0.41 ..... 1963. .26 24 0 N 65 E 0.85 2003. .97 ......... 23_.30 ............N,.62.E ......... 1.30 .......2043. ____496.78 516.68 5_3. 5.._0_4 76 .... 554.23 98 573.32 5 9~ ..... 5 9 2_. ,6 0 31 .... __611 · 25__.,,. 79 628.44/ 23 .......... 64.7 - _1639.67_ 1680.48 .1_'7_!.9.._8 5 ...... 1757.51 1793.42 __1_829.68 _1.866.28 1903.14 ~--- 1_938.35. MOBIL-' OIL COP, PORATION .HUG-1 GRANITE POINT _ALASKA ...................... VERTICAL 2". 1 SECTION · '~ I~Vla~~''~ ~ __SURV EY._.DAT E _. COMPUTED ALONG CLOSURE _SPERP~Y_-SUN _WELL_ SURVEYING_COMPANY_. __S U_-_3_-_:L6o.4 Z5 RECORD..OF_SUR.VEY~ ....... .... T RUE__ __I NC L.I N A..T.I ON__DJ R.E.C_T_IDN__ O 0 G-.. L E G MEASURED VERTICAL ...... D E_P.T.H. _D E R T.H. 5100..____.4530._14 5200. 4621.67 :__53.qo .____4_7.13...3.8 R E C_T_AN GU LA R_CD 0 R D.I.N AI E S___ SEVERITY VERTICAL D_E G__M.I_N .DE.G_ .... D E_G./_I.O 0 .... SEC!_I O_N== NOR_T. H___S O_U_T H E__A.S T WE 2.4__1.5 ..... N_6.3__E 0 . 8 23 45. N 64 E 0.64 2123.95 683.46 2011.14 .... 23__3_0 . . _ N_.6_5__E__.____O.._4_7 '____2.1.63.. 64 7..00_._3.1 ...... 2_0.4.!. 28_ 5400.____4805.09 5500. 4896.97 ..5600. ..... 3989.02 .... 23_..~.0__ N_6.5 E 0.,.00___22Q3 , 33 __7_.1.7_,.1_6 20_8_3_, 42 23 15 . N 64 E 0.46 2242.55 .734.47 211'8.90 ~ E . · . __.2.3____0. 'N_ 6:~ ......... 0 ~6____2.281 44_____._7_5.0_..9.8__ 215_4....31 5?OP..: 5081.07__ 5800. 5171.70 5~0.0 ._ ..... 5259? 99 . ..... 5321. ,~ ........ 5.93.0 **** THE_CAt 2~_...._0 N_.65 E __0,_00. ..... 2320.3.3 7.6.7_,5_9 2_189_._72 25 0 N 66 E 2.04 2362,46 784.68 2228.33 28 0 N__ _6_9_. E 3..- 28____ 2.4_Q9_. _3_c)_ .....8_0_ 1 ,.._5_1 2272· 16 ..) 80 ...... 2.8__. 0___________. N.. 69_.E .... 0.0.0 ..... 2442...2.4 .8.13...29 .__._2.3.0.2.._84 ~ \ C_ULATION PROCED._U_RES_A.~E___BASE_D_O_N_THE_U_SE OF THEffAN. G~E._NTIAt__OR CHORD METHOD _ H_.OR.I ZON'[A_t,_.D_I_SP. LACE.MEN.T___= .... Z.qS_2.. 2.4 FEE_T_.A]'_NORTH /.O_D_EG_.__....~Z__MI_N_.._EAST_.L_T__RU.E ) ! ' I ELL , COMPANY MOBIL OIL CORPORATION JOB NO. WELL GRANITE POINT STATE MUC ~I-1 LOCATION GRANITE POINT FIELD STA. RE-' MEAsuRED COURSE DRIFT VERTICAL DEPTH COURSE DRIFT COORDINATE DIFFERENCES RECTANGULAR COORDINATES SECTION NO. MARKS DEPTH LENGTH ANGLE COURSE TOTAL DEVIATION DIRECTION NORTH SOUTH EAST WEST NORTH SOUTH EAST WEST 11617 16 30 10447 70 N 7 W 2392 61 3811 '45 11702 16 45 10529 09 N 13 W 2416 48 ,-~ 3805 94 11806 17 15 10628 141 N 15 W 2445 54 3797 96 11908 15 45 10726 58 N!20 W 2471 55 3788 50 12028 15 30 10843 21 ,N 23 W 2501 07 3775 198 12111 15 30 10923 19 N 24 W 2521 23 ,, 3766 96 12326 17 30 11128 24 N 31 W 2577 56 3735 08 12410 15 45 11209 19 N 33 W 2596 68 , 3722 66 , 12539 16 15 11333 03 N 38 W ' 2625 13 - 3700 44 12625 15 30 11416 10 N 40 W 2642 18 r 3686 13 12737 ' 14 15 11523 68 !N 44 W 2661 84 3667 14 ,,, 12791 13 i45 11577 10 N 42 W 2691 55 3658 39 12857 14 15 11641 07 N 43 W 2683 43 3647 31 ' ! 12925 14 45 11706 83 j N 43 W 2696 09 3659 11 -, , 13157 14 30 11931 43 N 44 :W ...... 2737 87 ,,, 3595 16 , , , , , 13233 14 30 12005 17 N 45 W 2750 88 3582 15 , 13302 13 45 12072 19 NI45 W: 2762 47 2570 56 ,i 13375 14 00 12143 02 N 49 W 2774 05 2557 23 13483 13 30 12248 04 N 50 W 2790 26 '"" 3537 92 , COMPANY, MOBIL OIL CORPORATION WELL GRANITE POINT STATE MUC ~I-1 LOCATION JOB NO. GRANITE POINT FIELD , , , STA. RE- MEASURED COURSE DRIFT VERTI~M.' DEPTH COURSE DRIFT COORDINATE DIFFERENCES "1 RECTANGULAR COORDINATES SECTION NO. MARKS DEPTH LENGTH ANGLE COURSE TOTAL DEVIATION DIRECTION NORTH SOUTH EAST WEST NORTH SOUTH EAST WEST _ 13834 11 30 12581., 42 N 50,. W 2836 50 ., 3509, 99 L. 13872 12 15 12618 55 N 47 W 2842 00 3515 88 13917 12 00 12662 57 N 49 W 2848 14 3471 70 14057 12 15 12799 38 N 47 W 2868 40 3449 97 14155 12 00 12895 24 NI 53 W 2880 74 3433 77 t. ~ ¢ ~ ............... 14195 12 30 12934 29 N'53 W 2885 95 3426 85 14293 13 00 13029 78 N 55 W 2898 60 3408 79 14451 13 00 13183 73 N 54 W 2919 28 3379 87 14546 13 30 13276 11 N 57 W 2931 36 3361 27 14641 14 30 13368 08 N 53 W 2945 68 33 42 27 14820 13 00 13542 50 N 55 W! 2968 77 3309 28 15058 14 30 13776 51 N 58 W 3000 35 3258 75 15261 14 15 13973 26 N 57 W 3027 57 3216 84 15416 14 00 14123 66! N 60 W 3046 32 3184 37 15531 13 30 14236 49' N 59 W 3060 14 3161 i36 15639 12 15 14343 01 N 57 W 3072 74 3148 76 15700 12 45 14402 51 N 59 W 3079 68 4 3137 23 ? .~. l,J d /~ /~ . ~ ~ I Z'-7 jl,~~ ......... ~ ... ~.~ , ,i;/, ~:'. .... P,O. BOX 2127 * ANCHORAGE. Ai. ASKA TRANSMITTAL, STATE OF AIAS~C~ Di~_sion of Oil & Gas ~mchorage, Alaska Attn: Mr. Iiarry Kugler Dear Sir: CO~P~G~Y J~flv 22. 1969 have transmitted this date via __ Personal D~li¥cr~; ..... fi,lashed f~_ Ccre ,, ~ ., samples £rom the: Mobil Oil Cor.o~_- l_!~C No. I-1 Core NOo 1, 2, 3, ~ & ~ Colorado Oil & Gas Co. - Shaviovik No. 1 8 Box~.s - Washed 1170-7990 Core No. I & 2 Union Oil Co. - Trading Bay Unit G-30 i Box - k%shed 10,620-11,h50 · - Nc. 1 Fishhook Hill ~-oductions Co. ' - 1 Box - Washed 40-23~0 Please acknowledge receipt by returntnE one copy of this transmittal. Very truly yours, Bonsld G. Brockway American Stratigraphic 2CB; JP Receipt acknowledged Remarks: by date Form REV STATE OF ALASKA Sul~nit "Intentions" in Triplicate "Subsequent Reports" m Duplicat~ OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS O,N WELLS (Do not use this form for proposals to drill or to deepen or plug back to a dffflerent reservoir Use "APPLICATION FOR PEKMIT--" for such proposals ) 0IL GAS [] WELL WELL OTHER 2 NAME OF OPERATOR Mobil Oil Corporation 3 ADDRESS OF OPERATOR P.O. Box 1734, Anchorage, Alaska 99501 4 LOCATION O'F WELL At surfaoe (Leg 3, Conductor 3) 2391' South & 1379' East from NW corner, Section 13, T10N, R12W, S.M. 13 ELEVATIONS (Show whether DF, RT, GR, etc 106' MLLW (KB) Check Appropriate Box To [ndi'cate N~at'ure of NOtice, Re ~-API N~CAL CODE KLV - , ~'~/~,/-_-- 5-133-20179 ~v ~ ~ D~GNA~O~ ~D S~6 ..... REL ADL 18761 & ~ ADL ~874Z - Granite Point State 18742 9. WELL NO. M.U.C. 10 FIELD A~rD FOOL, OR WILDCAT Granite Point - Middle Kenai & Wildcat OBJECTIVE) Lease Line 500'W of NE corner, Section 13~ T10N~ R12W~ S.M. 12 PER/VIIT I~O 69-9 ~, o~ Other Data NOTICE OF INTENTION TO: TEST WATER SHUT-OFF I I PULL OR ALTER CASING FRACTURE TREAT ~ULTIPLE COMPI,ETE SHOOT OR ACIDIZE AEANDON$ REPAIR WELL CHANGE PLANS lO,her) Refer to Notice 6/24/69 FRACTURE TREATMENT I--t ALTERING CASING -- SHOOTING OR ACIDIZING ~ ABANDONMENTa J X .[ (Other)Abandoning exploratory portio~-~  NoTE: Report results of multiple completion on Well ompletion or Recompletton Report and Log form ) hole 15 DESCRIBE PROPOSED OR C0'4PLETED OPERATIONS (Clea~ly state all pertinent details, and give pertinent dates, including estimated date of starting an~ proposed work. 9 5/8" casing is cemented through the Middle Kenai producing interval, and the exploratory .... portion of the hole from 11,257' to 15,715' T.D. was plugged and abandoned as follows: 1) With open end drill pipe at 12,894', placed a 100 sack Class G cement plug on 6/27/69 2) With open end drill pipe at 11,458', placed a 125 sack Class G cement plug on 6/27/69 Ran in with bit and located top of cement at 11,269' (12' below 9 5/8" casing shoe). With open end drill pipe at 11,268', placed a 100 sack Class G cement plug. Cleaned out firm cement to 11,242'. Set a cast iron bridge plug on wire line at 11,239'. Pressure tested casing to 3000 psi O.K. 3) Prepared to complete Kenai sands for production. TXTLE Area Engineer DATE 7/9/69 (Thl~ ~pace for State office use) APPROVED BY CONDITIONS OF APPROVAL, IF AN~: TITLE DATE See Instructions On Reverse Side Appr~ e~ Copy Reyn~d (/p -- lvo~'m No 1R.EV ( STATE OF A. LASKA OIL AND OAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS SUBMIT I!~ DUPLICA%~E ~ NAME OF OPEP~ATOR Mobil Oil Corporation AP1 NUAiERICAL CODE ~ ~ API 5-133-20173 OKG LEASE DESiGNA~--ION A\-D SE~A~ NO ADL 18761 & MWK ~ 18 7 4 2 4 LOCATION OF WTM (Leg 3, Conductor 3) 2391'S & 1379'E fr NW Cor., Sec. T IF INDIA]~, ALOT/-EE OR TRIBE NAME 8 L~.'IT FA~RA{ OR LEASE N-kM~J~nn ~ ~Mobi]..-UnioD St~te.~T%& .~ uranzte ~oznt State J87~z ADDRESS OF OPEI:~ATOR 9 %VELL NO P. O. Box 1734 Anchorage, Alaska 99501 MUC #1-1 uranzce §~L~n~RD'I~f~le Kenai & Wildcat 13, TION, R12W, S.M. 11 SEC , T R, M (t~TTOM HOLE OB.mCrnrs) Lease Line 500' W of NE Cor. Sec. 13, TION, R12W, S.M. 1~- PEfi2VlIT NO 69 -9 13 RF-2~ORT TOTAL DP/H AT END OF MONI"rI, CIiA~NGF, S IN HOLE SIZE, CASING ~ CIIMEI~TING JOBS INCLUDING DEPTH SET AJN-D VOLU1VIES USET), PEIR~ORATIONS, TESTS A/ND I:LESULTS, FISHING JOB~, JLrNK IN HOLE AND SlDE-~CKED HOLE ANT) ANY OTHER SIGNIFICANT CI-IANGES IN HOL~ CONDITIONS June 1969 Drilled 8-1/2" hole 14,655'/15,700' Core 15,700'/15,715' Ran Electrical logs Placed 100 sax Class G cement plug at 12,894' Placed 125 sax Class G cement plug at 11,458' and a 100 sax class G cement plug at 11,268'. Cleaned out firm cement to 11,242'. Set cast iron bridge plug in 9-5/8" casing at 11,239'. Pressure tested 9-5/8" casing with 3000 psi, ok. July 1~ 1969 Preparing to perforate Middle Kenai zone for production. SXGmm -- (/L/~-~ ... T~TL~ Area Engineer DATE Julv 8_ 1969 ll J k~-~ - ' ¥ / · NOTE--Report on this form ~s r~ulred~/for each calendar month, regardless of the status of operat,ons, and must ~ filed m duphcate w~th the D~ws~on of Mines & Minerals by the 15th of the succeeding month, unless othe~se d~rected l~rm No ( STATE OF ALASKA OIL AND GAS CONSERVATION COMMI'ri'EE SUBMIT IN DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1. ~ NAME OF OPERATOR Mobil Oil Corporation 3 ADDRESS OF OPERATOR P. O. Box 1734 Anchorage, Alaska 99501 4 IX)CATION OF WF_.,L~ (Leg 3, Conductor 3) 2391'S & 1379'E fr NW Cor., Sec. 13, TION, R12W, S.M. APl NLrMERiCAL CODE API 5-133-20173 6 LEASE DE~iGBIA~--ION AND SE'RIAL 1~O ADL 18761 & ADL 18742 IF INDIA~', ALADTTEE OR TRIBE NA~E 8 L.~IT F.~! OR LEASE N a_ME  obil.-Unio~ .State ~11~742 ranzge ~olnn State g WELL .%'0 MUC ~)I-1 10..FLELD. uranlce §~n~R~'I~f~le Kenai & Wildcat 11 SEC . T, R, M (BO~I'I'O,%J HOI~E OBJmCrnm) Lease Line 500' W of NE Cor o Sec. 13, TION, R12W, S.M. 12 PI~MIT NO 69 -9 3 REPORT TOTAL DI~TH AT ~2~ID OF MONTH, CI-LA-~¢GES IN HOLE SIZE, CASING ~ CLWIF_~TING JOBS INCLUDING DEPTH SET ~ VOLUM~ USED, PF~R.FOB-~TIONS. ~-~TS ~ I~ESULTS. FISH/NG JO~, JI/NK L~I HOLE AND SIDE-~-R.~CI~D HOLE A_ITD A_NY OTHER SIGNIFIC/tNT CH~GES IN HOL~ CNDbrDITIONS June 1969 Drilled 8-1/2" hole 14,655'/15,700' Core 15,700'/15,715' Ran Electrical logs Placed 100 sax Class G cement plug at 12,894' Placed 125 sax Class G cement plug at 11,458' and a 100 sax class G cement plug at 11,268'. Cleaned out firm cement to'11,242'. Set cast iron bridge plug in 9-5/8" casing at 11,239'. Pressure tested 9-5/8" casing with 3000 psi, ok. July 1, 1969 Preparing to perforate Middle Kenai zone for production. 14 I hereby ce~,~ t~t the/o[egpmg m true and~ .c~'reet .,UW~D~~ ~~~ ~ =~ Area Engineer m*= July 8:1969 ,, ~7 h~9'~ ..... / ~OlE~Report on tins form ~ re'toreador eaca calendar moatk r esar~less o~ t~e statu~ ot onerauoa% aaO must ~ i~le~ m guplicate with the D,v,s,on of Mines & M,nerals by the 15th of the succeeding month, unless other,se d~rected ,: Form ]P---3 ( REV 9-30-67 STATE OF Ai~KA Subrrflt "Intentions" in Triplicate & ' Subsequent Reports" in Duphcate OIL AND GAS CONSERVATION COMMITTEE SUNDRY NOTICES AND REPORTS ON WELLS (DO not use th~s form for proposals to dr~ll or to deepen or plug back to a dff£ierent reservoir Use "APPLICATION FOR PF_,R2~IT--" for such proposals ) 0IL WELL [] GASWELL [] OTHER Mobil Oil Corporation ADD~S OF OPhiR Alas~ P.O. B~ 1734, Anchorage, 5 DCATION O,F ~e (Leg ~, oonduc~or 2~91~ S~Lh & 1~79~ EasL Section 1~, TION, R~, S.~. 13 ELEVATIONS (Show whether DF, RT, GR, etc lO6' MLLW (KB) 14 Check Appropriate Box To I~ndi'cate N~ature of NOtice, Re "5' API NT~CA_L CODE ~KO _~ 5-133-20173 ~LV sADLLEASE 18761DES~GNa~ON& ~n S~~ ~_-- ADL 18742 7 IF ~I~, ~'l'r~ OR ~BE N~ 8 UNIT F~ OR ~SE N~E . Hob[i-Union State ~)1 & ~ran~te ~o~ne Sgage 18762 ~ ~B~O ~.~.C. Granite Point ~le Kena~ & Wi I dea~ O~E) Lease Line 500'W of ~ corner, Section 13~ T10~ R12W~ 69-9 ~, or ~her Data NOTICE OF INTENTION TO: FRACTCBE TREAT MULTIPLE COMPLETE 8HOOT OR ACIDIZE ABANDONs REPAIR '~'ELL CHANGE PLANS (Other) BUBBEQUENT REPORT OF: FRACTUaE TREATMENT ALTERING CAGING SHOOTING OR ACIDIZING ARANDONMEN'T* (Other)  NOTE' Report reeults of multiple completion on Well ompletion or Reeompletion Report and Log form ) 15 DESCRIBE PROPOSED OR CO~YPLETED OPERATIONS (Clearly state all pertinent details, and give pertinent dates, including estimated date of starting an) proposed work. The 9 5/8" casing is cemented through the Middle Kenai producing interval and it is proposed to abandon the exploratory portion of the hole from the 9 5/8" shoe at 11,257' to 15,715' T.D. and complete in the Middle Kenai as a producing oil well. No productive permeable zones were encountered in the exploratory portion of the hole. As per verbal approval from Mr. Gilbreath on 6/19/69, the following abandonment procedure will be followed: 1) With open end drill pipe at 12,900' (Top of the Hemlock formation), place a 100 sax Class G cement plug in the 8 1/2" hole. Calculated fill 290'. 2) With open end drill pipe at 11,460' (200' below the 9 5/8" shoe), place a 125 sax Class G cement plug. Calculated fill 300'. 3) Clean out cement in the 9 5/8" casing to within 30'+ of the shoe, set a cast iron bridge plug on top of the cement, and complete the well as a Middle Kenai producer. NOTE: Heavy drilling fluid will be left in the abandoned portion of the hole. ~] ~ ~ ~L,~ ~' TITLE Area Engineer DXT~ June 24, 1969 See 1,nstructions On Reverse Side Approved Copy Returned 1"orTn No P--4 REV 9-~-6'~ STATE OF ALASKA OIL AND GAS CONSERVATION COMMI~EE SUBMIT ~ DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS NAME OF OPERATOR Mobil 0il Corporation ADDRESS OF OPEI~ATOR P. 0. Box 1734 Anchorage, Alaska 99501 LOCATION OF WELL (Leg 3, Conductor 3) _ 2391' South & 1379' E from NW Cor., Sec. 13, TION, R12W, S.M. AP1 NL~{ERI~AL CODE API 5-133-20173 6 LEASE DESiGnATION AND SERIAL NO ADL 18761 & ADL 18742 IF INDIAL~', ALOTTEE OR TRIBE NAME 1£ unlon Stage ~£ & Granite Point State 18742 9 WELL NO Mug #I-1 10 FrF. l.r~ AND POOL OR WILDCAT Granite Point-Middle Kenai & Wildcat 11 SEC, T. R, i%~ ('BO'I'I'OM ItOL~E O Lea~e 500' W of NE Cur. Sec. 13, TION, R12W 12 PElt.MIT NO 69 -9 13 REPORT TOTAL DEPTH AT E2gD OF MONTH, CHA~NG~S IN HOLE SIZE, CASING A_N-D CEA~ENTING JOBS INCLUDING DEPTH SET ~ VOL~ USED, P~O~TIONS, ~TS ~ ~SULTS FISHING JO~, J~K ~ HO~ ~D SIDE-~C~ HO~ . ] ~ ~ ~Y O~R SIGNIFIC~ ~G~ ~ HO~ ~ITIONS HLB May 1969 Drilled 12-1/4" hole 12,911'/12,975' Core with 8-15/32" bit 12,975'/13,017' Ran O.H.D.S.T. #1 12,910'/13,017' .IFP 30 rain 1~61 psi . / ISIP 120 min 7490 psi / F~? 240 min 1779 psi / FSIP 480 min 7514 psi Recovered 54 bbls water cushion . 7 bbls rat hole mud 1-2 bbls dk. brn. oil .~~,~.~// 1-2 qts. brackish water / Drilled 12-1/4" hole 13,017'/14,641' / Core 14,641'/14,655' / .Jume 1:1969 TRM OKo .,, KLV HWK_ ~< Drilling ahead with 12-1/4" bit @ 14,655' s,,c. mm /..~.~...--~.,~./~~~~ .=r~z Area Engineer r,A'rx June 13, 19_69. ,, NOTE--Report 0n this form IS r~/ed for each calendar month, regardless 0, the status of operations, and must 0e flied ,ri d~hcate w~th the D~wsmn of Mines & MineraFy the 15th of the succeed,ng month, unless otherw,se directed / STATE OF ALASKA OIL AND GAS CONSERVATION COMMI~EE SUBMIT IN DUPLICATE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS 1 OIL NAME OF OPEP,.ATOR Mobil Oil Corporation 3 ~nDR~SS OF OPm~OR P. O. Box 1734 Anchorage, Alaska 99501 4 LOCATION OF W~[~L (Leg 3 Conductor 3) 2391 'South and 1379' East from N~ Cdr. Sec. 13, TION, R12W, S.M. APl NU~iERICAL CODE API 5-133-20173 LEASE DESiGNA x--ION A\-D SEqRIAL NO ADL 18761 & ADL 18742 IF INDIAN, ALOTTEE OR TRIBE NAME ri-Union State ~fl & Granite Point State 18742 9 WELL NO MUC 10 Fie:lI~ AND POOL OR WILDCAT rsuitePoint Middle Kenai liOcat ' 11 SEC . T, R, M (BOTTOM HOLE o~ Lease Line 500'W of NE Cdr. Sec 12 TION, R12W 12 PEPdVIIT NO '"'13 REPORT TOTAL DEPTH AT END OF MONTH, CI-IA-NGES IN HOLE SIZE, CASING AND CEMENTING JOBS INCLUDING DEPTH SET A_ND VOLUMES USED, PERFORATIONS, TESTS A1TD I:{.ESULTS FISHING JOBS, JU'NK IN HOLE AND SIDE-T'R~CKED HOLE AND ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS April 1969 Drilled 12-1/4" hole 10,775'/11,158' Stuck drill pipe with bit at 9975', back off @ 9880'. Screwed into fish with jars in set-up and recovered fish. Ran Schlumberger electrical logs. Drilled 12-1/4" hole 11,158'/11,298'. Cemented 9-5/8" casing @ 11,257' with 900 sex class G cement. Drilled 8-1/2" hole 11,298'/12,911'. HLB TRh~, OKO KLV HWK FILE May 1, 1969 Drilling ahead with 8-1/2" bit. m/ y 1 $ 7 69 Area Engineer , $IGN]~D~''~ ~,"*~~~/~ TIT-J..~ DA~ May 14 1969 NOTE--Report on thls/f~rm is required for each calendar month, regardless of the status of operations, and must be filed in duplicate w~th the D~ws~on of Mmes & Minerals by the 15th of the succeeding month, unless otherwise thrected l~rm No ~v 9-~-~ STATE OF ALASKA OIL AND GAS CONSERVATION COMMIYI'EE MONTHLY REPORT OF DRILLING AND WORI¢OVER OPERATIONS 1. ~t'WLL WELl, OTHER 2 N~JN~E OF OPEI~TOR Mobil Oil Corporation 3 ADDRESS OF OPERATOR P. O. Box 1734 Anchorage, Alaska 99501 SUBMIT IN DUPLICATE 4 LOCATION OF WMLL (Leg 3 Conductor 3) 2391'S & 1379'E from NW Cor. Sec 13, TION, R12W, S.M. -~ Am ~mC~L coDE API 5-133-20173 6 LEASE DES-'GNA~--ION AND SERIAL ADL 18761 & ADL 18742 IF INDIALT, ALOTTEE OR TRIBE NAA~IE 8 L.~IT F.~AI OR LE&SE N~ME Mobfl Union State #1 & Granite Point State 18742 g WELL NO MUC #I-1 10 FIF. I,r~ A.ND POOL OR 1% ILDCAT r0 ite Point,Middle Kenai ltacat 11 SEC. T. R. Ii (BOTTOM HOL~: L o~uzcTq~) ease ,.zne 500' W of NE Cot. Sec. 13, TION, R12W 12 PERMIT ~O 69 -9 13 REPORT TOTAL DEl'TH AT END OF MONTH, CHA~N'GES IN HOLE SIZE. CASING A_N-D CL'MF-~NTING JOBS INCLUDING DEPTH SET AND VOLUIVIES USED, PKt:LFORATIONS. TESTS A/~D I:LESULTS FISHIIN'G JOB~ JLrNK L%I HOLE AND SIDE-TR~CKED HOLE AND ANY O'rH~R SIGNIFICANT CI-LkNGES IN HOI~ CONDITIONS .March, 1969 Drilled 12-1/4" hole 5715' to 10,775' ~pril 1, 1969 Drilling ahead with 12-1/4" hole. DIVISION OF OIL AND GAS ANCHO~ 14 I hereby certify that-the for_egomg ~s true and correct. e' ' '"'/ f ///. Area Engineer April 17 1969 · ' / ill ii i ii ii i i NOl£~Report on th,s form ,s require~ for each calendar mo.th, r e~ardle$$ o~ the status o~ ope;'at,on% an~ must be w~th the D~wsion of M,nes & M,nerals by the 15th of the succeed,ng month, unless otherw,se d,rected : lV~r-m No P---4 STATE OF Ab/kSKA SuBMrr IN Z~PLZC*..~ OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS NAME OF OPerATOR Mobil Oil Corporation ADDRESS OF OPEl:lAiR P. O. Bx 1734 Anchorage, Alaska 99501 4 LOCATION OF (Leg 3 Conductor 3) 2391'S & 1379'E fr NW Cor. Sec. 13, TION, R12W, S.M. AP1 NU~IEI:LICA.L CODE API 5-133-20173 6 LEASE DF. SiG1~tAi'i'ION AXD SERIAL NO ADL 18761 & ADL 18742 ? IF INDIAI~', ALOTI'EE OR TRIBE NAI~tlE 8 L.~IT F.~::~I OR LEASE N.-kME Mdbil Union State ~)1 & Granite Point State 18742 9 WEI.,L N'O ~0 FZ, F,J~ A_¥p POOL OR ~ranlue ffolnu, ~l~oole Kenai & Wildcat 11 SEC , T, R, M (BO~I'OM HOLE ommcTrv~ Lease line 500' W of NE Cor. Sec. 13, TION, R12W. 12 PEi~IT NO .., 69-9 13 REPORT TOTAL DEPTH AT END OF MONTH, CI-L~NG~ IN HOLE SIZE, CASING AND CE2VIENTING JOI~S INCLUDING DEPTH SET ~ VOLU/VIES USED, P~A~FOI{ATIONS, TESTS A_WI) I~ESULTS, FISHING JOBS, JLrNK IN HOLE A/~D SIDE-TIR. ACKED HOLE A/ND A_~Y OTHER SIGNIFICAx~T CI~IA2q~ES IN HOL~ CON-DITIONS February ~ 1969 Opened 12-1/4" hole to 16" to 6007'. While opening 16" hole to 22" the hole was sidetrack. ed at 1335'.~ An attempt was made to re-enter the old hole with no success. A cement plug was set from 1280'to 1145'. The hole was re-drilled from 1145' and the old hole was re-entered at 1368'. While opening hole to 16" the pipe was stuck @ 2250'. Top of the fish @ 2013'. The fish was washed over and dropped to bottom. Ran to bottom and recovered fish. Re-opened hole to 16" to 6007'. Cemented 13-3/8" casing at 59,73' w/750 sax Class G cement, through shoe and with 2200 sax through DV collar at 1992 . Had cement returns to the surface. Drilled out DV~collar and 13-3/8" shoe @ 5973' Cleaned out to 6007' but hanging up at 5917'. Wireline collar locator and an impression block showed that bottom two joints of 13-3/8" casimg had dropped off. A window was milled in the 13-3/8" casing from 56~28' to 5674'. Set a 172 sax cement plug from 5674' to 5580'. Polished off plug to 5638', set a dyn~drill and sidetracked the fish at 5638'. Re-drilling 12-1/4" hole. March 1~ 1969 Re-drilling 12-1/4" hole at 5715'. 14 I hereby cel31fy tl~at the f~regomg ~s true ~ ~ GG'.TIt Area Engineer SlG~ ~ DA~ March 24, 1969 .o, I .... ~ p rt on t~s [orm ~s reqw ~ [or alendar montk r egarWess o~ the status o[ operaUons, an~ must ~ file~ m ~phcate w~tb the D~v~s,on of Mines & Minerals by t~e 15t~ of t~e s~cceedmg month, unless other,se ~recte~ l~rm No P--4 REV STATE OF ALAS~ SUBMr; I~T DUPLICAT~ OIL AND GAS CONSERVATION COMMITTEE MONTHLY REPORT OF DRILLING AND WORKOVER OPERATIONS NAME OF OPERATOR Mobil Oil Corporation A]~DRL~SS OF OP]~R.ATOR P. O. Box 1734 Anchorage, A%aska 99.501 4 LOCATION OF WELL (LeE 3 Conductor 3) 2391' S & 1379' E from NW Cur. Sec. 13, TION, R12W, S.M. AP1 NUA{ER/CAL CODE API 5-133-20173 LE3%SE DESiGI~A~'qON A\-D SL-'RIAL NO ADL 18761 & ADL 18742 IF INDIA]~, ALOT .,t ~.~, O]{ TRIBE NAWIE - 8 L~'IT FA_RA{ OR LEASE N  6bil. Unio, State/~l ~8742 ranlge colnt Sta 9 WELL NO MUC # I-1 10 I"L,'7.AL.D A_ND POOL OR WILDCAT r it Poin Middle Kenai 11 SEC . T , R, M (BO~FOM HOLE OB.mCrnm) Lease Line 500' W of NE Cur Sec. 13, TION, R 12W. 12 PEPdVIIT NO 69-9 13 REPORT TOTAL DEPTH AT END OF MONTH, CHANGES IN HOLE SIZE,CASING AND CEMENTING JOBS INCLUDING DEPTH SET ~ VOL~ USED, PERFORATIONS, TESTS ~ RESULTS FISHING JOB~, JUNK IN HOLE AND SIDE-T]{ACKED HOLE A/XFD ANY OTHER SIGNIFICANT CHANGES IN HOL~ CONDITIONS January 1969 Moved in rig & spudded 4:30 AM 1-18-69. Drilled 12-1/4" hole & opened to 22" to 450'. Cemented 18" casing @ 437' w/ 700 sax class G cement including 3% CaC12 in the last 200 sax. Drilled 12-1/4" hole to 450' to 6007'. Opened 12-1/4" hole to 16" from 450' to 4419'. February 1~ 1969 Opening 12-1/4" hole to 16". DIVI$1ON OF C~ /,,iD GA3 14 I hereby certify that the Eoregomg h~ true ~ correct, srsw~o (~('-~ ~/~/'~~ .... =~ Area Engineer DAT~ March 24, 1969 NOTE--Report on th~s form s reqmreWfor each calendar month, regardless of the status of operatmns, anO must ~ flle~ in duplicate w~th the D~wsmn of Mines & Minerals by the 15th of the succeeding month, unless othe~se d~rected Ilo. Iqld)tl 0tl lqobtl De4r $1r: The driTlfng :paraft, Fora P-l. for 3~ur IIUC No. 1-1 approu~ on ,Jnur~ 17. I~. ~,emas R. Harsh~11. Jr. ~ctt~ Otrector FORM SA lB MEMORANDUM State of Alaska TO: r' FROM: 'fed~ ~, CMef Division of LJJds F. d. llmJ~, Mrec~or Imlr L, bm'ill, OtrJclw Tiaras L #mshll, ~r. l)JPAriJBrr oF IATUB~ i~SOJl~ DATE : ~ ,~, 1~1~ SUBJECT= LMM Limo ¥oll Agrmmmt erln~m fe4nt fteld J 1874~ Md ~ 1~B761 '~° ~omer L. Burrell Director PedroDenton /~ ~o~ Chief, Minerals Section DATE SUBJECT January 27, 1969 Line Well Agreement Enclosed is a copy of a line well agreement for a well to be located on or near the lease line between state leases ADL 18761 and 18742. ADL 18761 is a discovery lease and is presently paying royalty at the 5% rate. The agreement provides for allocating any production from ~he well equally to both leases. Do you see any objections by the state as royalty owner to allocation of production in this manner~ PD :pw Enclosure JAN B qa DIVISION OF OIL AND GAS ANCI-':OR;~ GE Mobil Oil Corporation 612 SOUTH FLOWER STREET LOS ANGELES CALIFORNIA, 90054 P.O. Box 1734 Anchorage, Alaska January 24, 1969 Director State of Alaska Divisior of Lands 344 Sixt Avenue Anchorag , Alask~ 99501 LINE WELL AG~ EEMENT GRANITE POIN~f WELL MUC #I-1 D~ ar Sir W~ are e~ closing b~tween ] obil Oi Pctroleu~ Corpor a~J Skel y Oil C a~reed t ~ the dr corner ~ Secti~ line bet ~een St; is held oy the the other four t from the Mob il-b~,, n Granite Point Pla~ operator. ~ree copies o7 a Line ell Agreement dated January 9, 1969, ~orporation, fnion Oi Company of California, Pan American on, Phillips Petrole~ Company, Sinclair Oil Corporation, any. This o~greement .~ovides that the a ~ove parties ~ave lng of a we] L to a b~ tom hole location ~ear the sout!~east 2, T10N, R12'~, S.M., ~ich will be on or near the lea~e of Alaska le~ses ADL ~761 and ADL 18742. Lease ADL 18761 t two parties named ~ve, and lease ADL 18742 is held by ies named a~ove. T~ well will be drilled directior~lly m by Mobil Oil Ccrporation as We refer you to paga 4 of the agreeme which provides tha production i ~om this well, and all ~'oyalty paid, wil~ ~e allocated one-hal± to lease ADI 18761 and one-half to lea~e ADL 18742. We ~quest the State of A~aska's appr¢ zal of this agreement ir sofar as it conce. ~s the manner of payment of the State's royalty. Upon appr~¢al of this agree~ nt by the State, please return on copy to US, For your informatio~ , by a letter dat~ January 8, 1969, we submitted to the State D~vision of O 1 and Gas a reque for exception to spacing for the above well. Sincere ly, RAG/pjc Enclosures Robert A. Gallison Land Supervisor ECE, VE JAN .q 1969 DIVISION OF Oil AND GAS january 21, 1969 Re: MUC No. 1-1 Mobil Oil Corporation, Operator NOTE TO THE FILE The operator's copy of the well permit was picked up at the Division of Oil and Gas office by a Mobil Oil Corporation representative on January 17, 1969. //' FORM SA lB MEMORANDUM TO: 1-- Industrial ~~espectm' FROM: Ibis, L. hrre11 Dtrectw' · lrlsten of 0tl and Gas State of Alaska OE~UffW~T OF NATURAL RESQUKC~ DIVI$101t OF OIL AND GAS DATE : SUBJECT: IIR~. 1-1 Hobfl 011 Corporation, Opertt~r E~clesed ts a c~py ef the approved application t~r pemJt to drill for tim above cipttamd ~11. FORM SA I B MEMORANDUM TO: j-' State of Alaska DIV/SlOII OF OIL. FROM: limit L. IIm'rel I DATE : SUBJECT: ItlC !~. 1-1 Mobil 0ll Corpor&ttou, Operator [qclesid ire tim ~ application j~r pemtt t~ drill, & lecittom plat, and &-check 'Jrt tim mamt of $50 for ftllng fee for the abeve referenced ~Jll. Mobil Oil Corporation 612 SOUTH FLOWER STREET LOS ANGELES, CALIFORNIA 90054 NW Producing Area P. 0. Box 1734 Anchorage, Alaska 99501 January 10, 1969 State of Alaska Division of Oil & Gas 3001 Porcupine Drive Anchorage, Alaska 99503 Attention: Mr. T. R. Marshall, Jr. Gentlemen: Enclosed are three copies of our application to drill well Granite Point MUC #I-1 (State Form P-l), three location plats and our draft for $50.00. This well will be spudded after receipt of your approval. Attachments Very truly yours, C. C. Woodruff Area Engineer revision o~ o~t ~o oas ANC~~ Form REV 9-30--6'I i SUBMIT IN TRI~ .TE (Other ~n~truct~ons ~n reverse side) STATE OF ALASKA OIL AND GAS CONSERVATION COMMITTEE APPLICATION FOR PERMIT TO DRILL, DEEPEN, OR PLUG BACK la TYP~ OF WORK DRILL J~ DEEPEN [] b. TYPEOF W~LL om ~ o~ ~ Wildcat ~ ~ WELL WELL 0THOR ZONE 2 ~A~ OF OP~TOR ~ob~l O~1 Corporation 3 ADD~ ~ OPhiR P. O. Box 173~ ~nchorage, ~lasks 99501 PLUG BACK [-] MLLTIPLE ~ ZONE 4 LOCATION Atsurface °~3v~S & 1379'E fr NW Cot. Sec. 13, TION, R12W, S.M. (Leg 3 Conductor 3) At proposed prod zone Approx. 500' W of the NE Corner of Sec. 13 TION, R12W, S.M. 13 DISTANCE IN MILES AND DIRECTION F-~OM NEAREST TOWN OR POST OFFICe* Approx. 10 miles South o,f Tyonek · 14 BOND INFOPa~A:UON Pacific Indemnity Co. TYPE 0il & GaS s,retsand/orNo #243305 (Expires 9/18/71) 15 DISTANCE FROM PROPOSED* ~-- 1 .... 1..:- A c 16 NO. OF ACRF~ IN LEASE LOCATION TO NEAREST vtt m ~ c,..J ~ ~=~ m m ttl=~ Og 1 PROPERTY OR LEASE LINE, FT 5780' from State 5089 in ADL 18761 (Also to nearest drlg, umt, if any)~lnieased propertv 5060 in ADL 18742 18 DISTANCE FROM PROPOSED LOCi'lION* ' - 119 PROPOSED DEPTI-I TO NEAREST WELL DRILLING, COMPLETE~, '[ 147 00 ' V, D, OR APPLIED FOR, FT 1850' 16000 ' M.D. 21 ELEVATIONS (Show whether DF, RT, CR, etc ) 106~ above lqLLW (K.B'), . 23 PT~OPOSED CASING AND CmENTING PROGRA/VI AP1 50-133-20173 6 LF~kSE D~9~qTI%N AND SgI~AL NO ADL ADL 18742 IF ~. ~~ OR ~ N~ 8 LTNIT FAR1VI OR LEASE N/LIVIE Mobil-Union State #1 & Granite Point State 18742 WELL NO MUC #I-1 10 FIKLD AND POOL, OR WILDCAT r it Point & Middle Kenai 11 SEC , T, R, M, (BOTTOM HOLE OBJECTIVE) Lease line 500' West of ~E' Corner Sec. 13~ TION~ Ri~W A~o,,~t $100,000. O0 8O 117 NO ACRES ASSIGNED TO THiS WELL 20 ROTARY OR CABLE TOOLS Rot a ry 22 APPROX DATE WORK WILL START* February 1, 1969 ,, SIZE OF HOLE SIZE OF CASING/ WEIGHT PER FOOT GRAD~ SETTiNG DEPTH QUANTITT OF CF. MENT 22" 18" 70.59 I B 400'+ Circulate to surface 16" 13-3 ~8' 61~0 Jr55 6000'+ Stage ,,,to Surface 12-1/4' 9-5/~ 40 & ~+3'.5 ,,lq,-80,~S~, !Z40,0'+~' M.iRimu~-500' above pr~dueing.Zo~ 8-1/2' 7" 32. Pll0 , 16000'+ Suffi,cient to fill to liner top / The well will be directionally drilled approximately 4200', N55°E from the surface location to total depth in order to reach the objective from the permanent platform. B.O.P. Program 400" to 6000': 20-3/8" Hydril "MSP 2000 psi WOG 6000' to T.D.: 13-3/8" Hydril "GK" 5000 psi WOG 13-3/8" Cameron "U" triple hydraulic 5000 WOG JAN 1 0 1969 If ._I~_.po.sal i,s to deepen or plug l:mck g,ve data on presen?pONDjv~ ~ OiL A"~d~A pr%gs~ ~%%d~,v~ ~ If%roOp~Y~ d~,51 o~ d~n a~ec~_o~lly, g,ve pe~men~ ~ on ~bs~ace ~t~~ ~d ~ue venal dep~ Give blowout preventer program 24 I hereby 7~'~hat the~F°~;e~°mg ,CMl'rue and Cqr"ct (Th~ space for 8~te offi~ S~L~ ~D CO~ CroPS E~U~ ~ ~U~ ~ Y~ ~NO APPROV~BV_-- ..... TI~. Director *See Inductions On Reveme Side Area Engi~neer January 17. lg6g ~A~ January 17.~ lg69 ( STATE OF ALASKA DEPARTMENT OF NATURAL RESOURCES DIVISION OF OIL AND GAS Alaska Oil and Gas Conservation Committee 3001 Porcupine Drive Anchorage, A1 aska 99504 Re: Emergency Order - January 17, 1969 Conservation File No. 70 Mobil Oil Corporation MUC #l-l, Granite Point Field Bottomhole target area covers portions of NE¼ of Section 13, SE¼ of Section 12, TION, R12W. S.M., the Sk~ of Section 7, or the Nk~ of Section 18, TION, RllW, S.M. Mobil Oil Corporation petitioned the Alaska Oil and Gas Conservation Committee on January 8, 1969, for an order excepting the referenced well location from the footage spacing requirements of Section 2061, Title ll, AAC. On January 17, 1969, said corporation requested an emergency order to permit the drilling of the referenced well. The affected operators have joined Mobil Oil Corporation in the request for an emergency order. An emergency order is hereby granted pursuant to and in accordance with Section 2012 of the Alaska Oil and Gas Conservation Regulations permitting the drilling of the referenced well. This emergency order expires January 31, 1969. ~Thomas R. Marshall, Jr. Executive Secretary 35 2 13 11 &N AM ,'~kb.State :44-11 6 7 Location Plat MUC I-1 1" = 2000' '~/~ 13 !4-1~,/ RECEIVED ~ ~" ~- 0 ~%.~ 18 IIVISIONOF OIL AND OAS ^Nc _H~_o~__L _ ' ; Mobil Oil Corporation 9JPROPOSED ! LOCATIO~ · WELL 1 f.~UC I-1 I MOBIL-UNION ADL 18761 ~~~[~_ . . U 31-13 ~ ~