Department of Commerce, Community, and Economic Development
Alaska Oil and Gas Conservation
Commission
HOME
EVENTS
DATA
Data List
Drilling
Production
Orders
Data Miner
Document Search
REPORTS
Reports and Charts
Pool Statistics
FORMS
LINKS
Links
Test Notification
Data Requests
Regulations
Industry Guidance Bulletins
How to Apply
ABOUT US
History
Staff
HELP
Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
186-025
Image Project Well History File Cover Page XHVZE This page identifies those items that were not scanned during the initial production scanning. They are available in the original file, may be scanned during the rescan activity or are viewable by direct inspection of the file. J..~- ~_~-~ Well History File Identifier RESCAN DIGITAL DATA OVERSIZED (Scannable) [] Color items: [] Diskettes, No. D Maps: [] Grayscale items: [] Other, No/Type [] Other items scannable by large scanner [] Poor Quality Originals: OVERSIZED (Non-Scannable) ::~ Other: Logs of various kinds ..~~ [] Other TOTAL PAGES: NOTES: ORGANIZED BY: B BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ Project Proofing [] Staff Proof By: Date: PROOFED BY: BEVERLY BREI~ VINCENT SHERYL MARIA LOWELL DATE: Is/ PAGES: ~'"/~ (at the time of scanning) SCANNED BY.' BEVERLY BREN VIN~ARIA LOWELL ReScanned (done} RESCANNEDBY: BEVERLY BREN VINCENT SHERYL MARIA LOWELL DATE: /S/ ~ Quality Checked (done) I1[ IIIIIIIIIIIII al RevlNOTScanned.wpd MICROFILMED 9/11/00 DO NOT PLACE ANy NEW MATER/Al. UNDER THIS PAGE PLUGGING & LOCATION CLEARANCE Rw, PORT State of Alaska .ALASKA OIL & GAS CONSERVATION COMMISSION Memcrandu_m To File: APi No. Well }Ia_me Operator Lccation Note casing siz~ wt, depth, cmt vol, & procedure. Liner: Review the well file, and' comment on plugging, well head s r. atus, and location clearance - provide loc. clear, code. Well head cut off: ~ .- Marker post or plate: ~ Location Clearance: ~ Code Shell Western E&P Inc. An affiliate of Shell Oil Company P. O. Box 576 Houston, TX 77001 December 14, 1995 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, AK 99501-3192 SUBJECT: SUBMITTAL OF ABANDONMENT REPORT (FORM 10-407) for MIDDLE GROUND SHOAL A4'IA-I'I REFERENCE: APPROVAL NUMBERS 86-25 Enclosed are duplicate copies of the Abandonment Report (Form 10-407) for Middle Ground Shoal A41A-11. Abandonment operations were completed 10/3/95 during reddlling operations for Middle Ground Shoal A41A-11LN. If you have any questions or wish to discuss, please call Marcus Winder at 713/544- 3797 or Jeff Wahleithner at 713/544-3344. Sincerely, S. Nady, Manager Asset Administration - Western Asset Continental Division Enclosures WCPAOGCC.DOC- 1 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well 2. Name of Operator 7'. Permit Number Shell Western E&P Inc.,~ ~ ~ ?_._-' ~, ~ ~:~~ t ~,.'~,~ 86-25 3. A,,ress 8. AP, Number P.O. Box 576, Houston, TX 77001-0576 "~'~ ~- 733-20179-02 4. Location of well at surface ~ ,',~' ~ ~ ..... .7,.-~ 9. Unit or Lease Name PLATF A, LEG 2, COND 12, 1677' FSL & 367' FEL Sl1, T8N-Ri3N~ ----_ .,~~';',J;~:~ i, NIDDLE GROUND SHOAL At Top Producing Interval ,; lO. Well Number 7765' FID, 7151' IVD: 4396' FSL & 548' FEL Sll, 18N-R13W $. Elevaticn in feet (indicate KB, DF, etc.) I 6. Lease Dosignaticn and Serial No. FIIDDLE GROUND SH0J~d- 116' KBI ADL 18756 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband IlS. water Depth, if offshoreI 1~. No. of Completions I I 3-1- 86 3- 24- 86 10- 3- 95 80 feet MSL I 17. Total Depth (MD + TVD) 18. Plug Back Depth (MD + TVD) 19. DirectionalSurvey 120. o., w o,os sv0o, I I>1. Thickness of Permafros, 7765' HD; 7151' TVD - - - YES [] NO []I NONE feet MDI N/A 22. Type Electric or Other Logs Run 23. CASING, LINER AND CEMENTING RECORD SETTING DEPTH MD CASING SIZE VVT. PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED 20" CONDR 0 330' - - - 13-3/8" 0 1990' 17-1/2" 810 SX - - - 7" 26, 29~ N-80 0 7765' 8-1/2" 824 SX - - - 24. Perforations open to Production (MD + TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) 26. ACID, FRACTURE, CEMENT SQUEEZE, ETC. DEPTH INTERVAL (MD) AMOUNT & KIND OF MATERIAL USED 6084' - 7289' ABANDONED VIA SE'I-rING/CHT'G OF 5" LNR DURING DRLG; ....... 0PEllATION5 FOR WELL NO. A41A- llLN. 27'. PRODUCTION TEST Date First Production I Method of Operation (Flowing, gas lift, etc.) I Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE I GAS-OIL RATIO I TEST PERIOD Flow Tubing Casing Pressure CALCULATED OIL-BBL GAS-MCF WATER-BBL OIL GRAVITY-APl Press. 24-HOUR RATE 28. CORE DATA Brief description of lithology, porosity, fractures, apparent dips and presence of oil. gas or water. Submit core chips. NONE ~ :~ ?' ....... ~' :, Form 10-407 Submit in duplicate Rev. 7'-1-80 CONTINUED ON REVERSE SIDE - 49 - GEOLOGIC I~KERS FORMATION TESTS .. Include interval tested, pressure data, all fluids recovered and gravity, GOR, NAME MEAS. DEPTH TRUE VERT. DEPTH and time of each phase. A5 6081' 5595' FG 6287' 5783' FL 6551' 5904' FP 6716' 6054' FS 6819' 6265' FW 7015' 6445' GB 7149' 6456' GD 7289' 6590' 31. LIST OF ATTACHMENTS MORNING REPORTS 32. I hereby certify that the foregoing is true and correct to the best of my knowledge O.j~~~,~// /xf~ G. S. NADY Title "GR.- A~SET AD"IN. Date 12/14/95 S~ned INSTRUCTIONS General: This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1: Classification of Service Wells: Gas injection, water injection, steam injection, air injection, salt water disposal, water sup. ply for injection, observation, injection for in-situ combustion. .. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24: If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21: Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cementing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water Injection, Gas Injection, Shut-in, Other-explain. Form 10-407 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD LEASE PLATFORM "A" WELL A41A-11 ~ORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: WOC PROG. DEPTH 12170 ELEVAT- KB TO MSL 116.0 DATE ~0_0.~/9~ PRESENT DEPTH 10743 DIST. KB TO BHF 38.4 DAY 59 FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~10 UATER DEPTH 80 LAST BOP TEST ~9~J9~ LAST CSG TEST ~L~ZL~ MIDDLE GROUND SHOAL BHA INSPECTION (CUM. ROT, HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED /GALLOUAY DR SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 11.00 RIG AND RAN 123 JTS~5060' TOTAL PIPE~ 5" 18# P-110 STL CSG TO 7" SHOE 2.00 CIRC I DP VOL AT 9_0~_PS~_.5 88L MIN. IHANGER SETS AT 1300 PSI_)_ ...... 2.50 FINISHED RUN C_S~_~L~TT~ff~ 10743'. DETAIL: ENERPRO SHOE AT 10743~_____ BAKER FLOAT COLLAR AT 1069_7~_BA~ER LANDING COLLAR AT 10655~. RAN 123 TOTAL JT~S~__5060~ OF CSG. BAKER "HMC" LINER HANGER~__6~ TIE BACK SLEEVE TOP AT 5663~. PICKED UP CEMENTING HEAD. 2.50 DROP BALL TO SET HA~ER~_~IRC BALL DOWN AT 1500 PSI, 2 ~L_JMIN RATE. BALL LANDED I~__~AT~_PR~S__U.U~_UP TZ3200 PSI AND SHEARED OUT SEAT. BEGAN CIRC AT 2.8 B~/MIN AT 900 P~_LOST RETURNS. 3.00 HELD PRE JOB SAFETy/PROCEDURES MEETING_,__GOT A NEW GAME PLAN TOGETHER. HOUCO PUMPED 20 BBLS .OI~3~_BBLS WATER .~/SURFACTANT~I~_BBLS TRINITY LITE C_E~NT~ YEILD 1.32 WT. 13.2 PPq~__~UZ~.O HALAD 34~.,_.~3% CFR ~ .40% HR-5 USING BATCH MIXERS. BAKER DROPPED DART.~ HOUCO DISPLACED ~/.~ BBLS WATER ~/SURFACTANT~_5 BBLS OI~_78_BBLS 9.2 PPG M_U~.25 BBL 15 PPG PILL FOLLOUED BY 17 BBLS OF 12.2 PPG MUD. DID NOT BUMP PLUG. CIP AT 0309 HRS lO_L~L~5. BLED OFF ~I_~ FLOATS HELD. 3.00 LAY DOWN CEMENTING H~&~_POUzL6F DOUN C-2 RUNNING TOOL. NOTE: AFTER LOSING CIRC UE NEVER REGAINED RETURNS. PUMPED JOB UITHOUT RETURNS BUT HAD A ST~Y,_CONTINOUS PRESSURE RISE AFTER CEMENT CAME AROUND THE SHOE ..... HOLE STOOD STATIC DURING THE JOB EXCEPT TIME (HRS~ CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAI RS FISHING NIP UP/DOUN /BOP/UH TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA RIG UP/TEAR DOWN gAIT ON WEATHER/MAT EVALUATION CORING OTHERS FOR VERY SMALL ATTEMPT AT RETURNS DURING LAST 5 BBLS OF JOB. @ 20 @ 40 487.25 3.00 4.50 13.50 3.00 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: gELLS R V PRESENT ACTIVITY: WEEKLY BOPE TESTS PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~0__~/9~ PRESENT DEPTH 10743 DIST. KB TO BHF 38.4 DAY 62 FOOTAGE DRILLED NLTA LTH/YTD ___/___ EST. DAY 4~ SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~ UATER DEPTH 80 LAST BOP TEST ~O_.~E/9~ LAST CSG TEST ~8/~Z/9~ / BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED @ 20 PP2 @ KILL SPEED @ 40 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 5.00 LAY DO~N EXTRA__.~/HUDP/~'S OUT OF DERRICK. 2.50 MU BIT AND TIH ~4450' 1.50 CUT DRILLING LIN~_~ERVICE RIG_~TOP DRIVE. 1.00 FINISH TIH T/TOP OF LINER AT 5663''N0 CEMENT ANYUHERE. 2.00 ClRC COND MUD TO BALANCE OUT MULTIPLE MUD gE~GflT~ FINAL IS 11.4 PPG. .50 TEST LINER LAP. PUMPING FLUID AWAY AT 580 PSI. 13.4 PPG EMU AT THE LINER TOP. 1).2 PPG AT THE OLD GAS WELL PERFS. 2.50 POH ~LCLEANOUT ASSMY. 4.50 MAKE UP LINER TOP ISOLATION PACKER,:~H VERY SLOULY. 1.00 MAKE UP TOP DRIVE. SET ISOLATION PACKER IN 5" LINER TIE-BACK~S~T 20K DO~N UEIGHT.:~Q~TE. IO TURNS TO THE RIGHT TO RELEASE. PICKED UP 12' .____ SET BACK DO~N 2~ AND ENGAGED PACKER TIE BACK SLEEVE CONFIRMING IT SET AND ~E ~ERE ABOVE IT WITH RUNNING TOOL. SET 60K DOUN WEIGHT ON PACKER TO ENERGIZE ELEMENT. PICKED UP 1.~.~z._~LOSED RAMS PRESSURED UP T,/900 PSI PUMPING FLUID A~AY. RELEAS_E~ PR~SU~ BLED DOU~._T.~25 PSI. BLED OFF OPENED RAM~_S__E~_6__~O~ DOUN WEIGHT ON PA~R_~_CLOSED RAMS~ PRESSURED UP T_/2300 PSI AT 4 BBLS MIN R_.__~.A~.L_~P~MP~' 7 BBLS:_SHUT ~-~ ~"~:~T-~P~ESSURE BLED DO~ T/525 PSi. BLED OFF PRESSURE. NO GOOD TEST. 2.00 POH ~JC-2 RUNNING TOOL~_~AY DOUN TOOLS. 1.50 DOING gEEKLY BOPE TEST 'WHILE MOBLIZlNG 5# AND 7# RTT~[CHAMP PACKERS. TIME_~RSI ...... CUM. ROT. HRS 487.25 ROTATING MUD MOTOR TRIPPING ~2.50 C & C 2.00 REAMING SURVEYS JET REPAIRS FISHING #IP UP/DOUN /BOP/UH TESTING BOP /UH 1.50 RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 5.00 INSPECT BHA RIG UP/TEAR DOUN UAIT ON UEATHER/MAT ..... EVALUATION CORING OTHERS 3.00 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A# FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A# UELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R ¥ PRESENT ACTIVITY: ROTARY DRILLING PROG. DEPTH PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 /GALLOWAY DR 12170 ELEVAT. KB TO MSL 116.0 DATE l~L~/~ 10712 DIST. KB TO BHF 38.& DAY 57 31 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 908 LAST BOP TEST g9__L~E/9~ LAST CSG TEST ~8/g~/9~ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 1100 a 20 PP2 @ KILL SPEED 1850 ~ 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH' OPERATION) : 4.00 ROTARy/MOTOR DRILLING FROM 10681 TO 10691'. .50 CHECK FLOW AND PUMP DRY JOB. 4.00 POH WITH BHA. 1.OO ~ BHA AND ~/U.iBHA WITH BIT #21. 4.50 R-IH WITH BHA. FILL DP AT 4200~ AND CASING SHOE. NIH TO 10.400' 2.00 BREAK CIRCULATION AND REAM OPEN HOLE FROM 10z400~ TO 10,~9._1'. 8.00 ROTARY DRILL FROM 10691~ TO 10712~ IADC DULL BIT GRADING #20 - 4-8-BT-GM-E-3/O-RG-PR TIME J CUM. ROT. HRS J ROTATING 12.00 J MUD MOTOR [ TRIPPING 8.50 I c&c .so J REAMING 2.00 J SURVEYS J JET J REPAIRS J FISHING J NiP UP/DOWN /BOP/UH J TESTING BOP J RUNNING CASING J CEMENTING J PICKUP/LAY DOWN DS INSPECT BHA 1.00 RIG UP/TEAR DOWN WAIT ON WEATHER/MAT J EVALUATION CORING J OTHERS 477.25 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PROG. DEPTH 12170 PRESENT DEPTH 10743 FOOTAGE DRILLED 31 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 /GALLOWAY DR PRESENT ACTIVITY: ~/U TO RUN CASING SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 10.00 ROTARY DRILL FROM 10712' TO 10743'. ELEVAT. KB TO MSL 116.0 DATE igL9~L~ DIST. KB TO BHF 38.4 DAY 58 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA ~0__~9 LAST BOP TEST ~9/~/9~ LAST CSG TEST ~L~/9~ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 1100 @ 20 PP2 @ KILL SPEED 1850 @ __4~ 2.00 CHECK FL~O?~_c_RUMP~P~I~.:AND RUN SHORT TRIP. TIGHT SPOT AT 10466 AND 8650'. 1.00 SERVICE TOP DRIVE AND RIG. 1.50 MAKE GOOD SHORT TRIP - NO BAD SPOTS. 3.50 CIRCULATE WEIGHTED PiLL ~50 BBLS - 15#2. CONDITIONED HOLE. 4.50 CHECK DROPPED DRIFT WHEN UP IN CASING SHOE. 1.00 I_/D BHA. .50 PREP TO RUN CASING. NOTE: BLAIR WANDZELL OF AOGCC DECLINED WITNESS OF BOP TEST AND GAVE PERMISSION TO RUN TEST AFTER LINER JOB. \ TIME ~RS1 ....... CUM. ROT. HRS 487.25 ROTATING 10.00 MUD MOTOR TRIPPING 8.00 C & C 3.50 REAMING SURVEYS JET REPAIRS FISHING NiP UP/DOWN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA 1.00 RIG UP/TEAR DOWN UAIT ON WEATHER/MAT EVALUATION CORING OTHERS 1.50 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM UA" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM CELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: ~fU BNA PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 10616 DIST. KB TO BHF 38.4 DAY FOOTAGE DRILLED 62 NLTA LTH/YTD / EST. DAY 45 · SiZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- OEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~0._~.6 CATER DEPTH 80 LAST BOP TEST ~_~/_~ LAST CSG TEST ~Z/'~ /GALLOUAY DR BNA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 1300 @ 20 PP2 @ KILL SPEED 1975 @ 40 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 17.50 ROTARY/MOTOR ORILL FR0~_Z~554' [~]~,616'. MOTOR STALLED OUT AT 10616~. UNABLE TO DRILL DEEPER. .50 CHECK FLOW AND PUMP DRY JOB. 3.50 POH UITH BHA. 2.50 L_L~_BHA. L/D 7 JTS BENT HWDP. CHECK ORIENTATION OF MOTOR. MOTOR __ ORIENTATION OFF 90 DEGREES. MAKING UP NEW BHA UITH BIT #20 AT REPORT TIME. DULL BIT GRADING BIT #19 - 6-8-BT-A-F-I-CT-HR TIME ~RS~ CUM. ROT. HRS 447.75 ROTATING 7.00 MUD MOTOR 10.50 TRIPPING 3.50 c & C .50 REAMING SURVEYS JET REPAIRS FISHING NiP UP/DOUN /BOP/~X TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA 2.50 RIG UP/TEAR DOUN UAIT ON WEATHER/MAT EVALUATION CORING OTHERS SUEPI ALASKA DALLY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM aA" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A# WELL A~1A'11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELL~ R V PROG. DEPTH 12170 PRESENT DEPTH 10681 FOOTAGE DRILLED 65 _ SIZE OF LAST CSG 7'000 OEP. OF LAST CSG 7765 WATER DEPTH 80 /GALLOWAY DR PRESENT ACTIVITY: ROTARY/MOTOR DRILLING ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 56 NLTA LTH/YTD ___/___ EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA LAST BOP TEST ~9/~/9~ LAST CSG TEST BNA INSPECTION (CUM. ROT HAS) PP1 a KILL SPEEO 1080 @ 20 PP2 a KILL SPEED 1800 a 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : .50 COMPLETE M/U OF BflA. SURFACE TEST MUD. TEST FAILED. 1.00 POH WITH MWD AND CLEAN. REINSTALL AND SURFACE TEST. TEST OK. 4.00 RIH ~ITfl BHA. FILL DP AT 4200 AND CSG SHOE. .50 RUN THROUGH OPEN HOLE TO BOTTOM. TIGHT SPOT AT 8800~. .50 REAM OPEN HOLE FROM 10527 - 10616'. 17.50 ROTARY/MOTOR DRILL FROM 10616' TO 10681' NOTE TO AlT PARTNERS - MANHOURS FOR OCTOBER ARE DUEl PLEASE RETURN TO LARRY LITTLE. THANKS TO SWS - ALLREADY HAVE RECIEVED YOURS. T I M E .£_~ R__SI__ CUM. ROT. HRS 465.25 ROTATING 10.50 MUD MOTOR 7'.00 TRIPPING 4.50 C & C REAMING .50 SURVEYS 1.00 JET REPAIRS FISHING NIP UP/DOUN /BOP/WH TESTING BOP /k~H RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA .50 RIG UP/TEAR DOUN UAIT ON WEATHER/MAT EVALUATION CORING OTHERS SUEPI ALASKA DAILY DRILLING REPORT PACE 1 OF 1 RIG NAME PLATFORM UAU FIELD MIDDLE GROUND SHOAL LEASE PLATFORM 'fA" UELL A41A-11 UORK ORDER 739930 SIDE TRACK ; DRILLING FOREMAN: ~ELLS R V PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 10457 DIST. KB TO BHF 38.4 DAY FOOTAGE DRILLED 30 NLTA LTH/YTD ___/___ EST. DAY ._~ SIZE OF LAST CSG 7.000 LTA LTH/YTD ___/___ DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA UATER DEPTH 80 LAST BOP TEST 9~_L~EL~ LAST CSG TEST /GALLOUAY D~ BfiA INSPECTION (CUM. ROT fiRS) PRESENT ACTIVITY: ROTARy/SLIDE DRILLING SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 3.50 IOTa[Y__L SLIDE DRILL FROM 10427 TO 10442'. 4.50 CH[~K F._._.LO_~_~.U_~UM~_DRY JOB AND POH UITH BflA. 1.50 LL.~_ BHA AND ~L_g. NEU BHA UITH BIT #19. 4.00 NIH UITH BHA. FILL DP AT 4200~ AND CASING SHOE. PP1 @ KILL SPEED 1300 @ ._~2~ PP2 a KILL SPEED 1975 @ 2.00 CUT AND SLIP 100~ DRILL LINE. INSPECT BRAKE ASSEMBLY ON DRAU UORKS AND SERVICE RIG. 1.50 NIH UITH BHA. REAM THRU LEDGE AT 9895~ 1.50 BREAK CIRCULATION AT 10371~ AND ATTEMPT TO REAM TO BOTTOM. PACKED OFF UITH HIGH TORQUE - PULLED FREE AND REAMED TO BOTTOM. 1.50 ROTARY DRILL FROM 10442' TO 10446'. 4.00 ROTARY/SLIDE DRILL FROM 10446~ TO 10457~. DRILLING AHEAD AT REPORT TIME. IADC DULL BIT GRADING #18 - 2-3-NO-A-E-I-ER~PR TIME ~RS2 ....... CUM. ROT. HRS 406.25 ROTATING 3.00 MUD MOTOR 5.00 TRIPPING 10.00 C & C .50 REAMING 1.50 SURVEYS .50 JET REPAIRS FISHING NiP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMEHTING PICKUP/LAY DOUN DS INSPECT BflA 1.50 RIG UP/TEAR DOUN UAIT ON UEATHER/MAT EVALUATION CORING OTHERS 2.00 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM UA" PROG. DEPTH 12170 FIELD MIDDLE GROUND SHOAL PRESENT DEPTH 10554 LEASE PLATFORM aA" FOOTAGE DRILLED 97 UELL A41A-11 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 /GALLOUAY DR PRESENT ACTIVITY: ROTARY/MOTOR DRILLING UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: UELLS R V SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 24.00 ~O[GRY/MOTOR DRILL FROM 10457' TO 10554' PREPARING TO SURVEY AT REPORT TIME. ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY __~5~ NLTA.LTH/YTD / EST. DAY LTA LTH/YTD _~/_~ DAYS +/- DAYS SINCE LAST LTA LAST BOP TEST ~9_Lg~/9~ LAST CSO TEST BHA INSPECTION (CUM. ROT HAS) PPla KILL SPEED 130~ ~ ._~ PP2 @ KILL SPEED ~Z~ a .~..4~ NOTE: PUMPED HIGH VIS SUEEP AT 10457~ TO HELP CLEANUP HOLE AND PREVENT PACK-OFF[STICKING PROBLEMS ENCOUNTERED YESTERDAY. T I ME .(.H_R._~S2 CUM. ROT. HRS 430.25 ROTATING _8_.00 MUD MOTOR !6.00 TRIPPING .... C & C REAMING .... SURVEYS JET REPAI RS FISHING NIP UP/DOWN /BOP/I~H ..... TESTING BOP /~H RUNNING CASING CEMENT I NG PICKUP/LAY DOI,/N DS .... INSPECT BHA .... RIG UP/TEAR DOIJH .... UAIT ON k/EATHER/MAT .... EVALUATION .... CORING .... OTHERS .... SUEPI ALASKA DALLY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A" ~ELL A41A-11 ~ORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 10295 DIST. KB TO BHF 38.4 DAY 51 FOOTAGE DRILLED 40 NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- OEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 902 UATER DEPTH 80 LAST BOP TEST ~9/2~/9~ LAST CSG TEST /GALLOUAY DR BHA INSPECTION (CUM. ROT HRS) PRESENT ACTIVITY: &gTA-R~/SLIDE DRILLING PP1 @ KILL SPEED 1750 @ 30 PP2 @ KILL SPEED 2600 ~ 50 SUMMARY OF OPERATIONS (SNOU HOURS FOR EACH OPERATION) : 1.50 CONT TO POH UITH LOGGING TOOL. 1.00 L/D 8HA U[TH LOGGING TOOL. 3.50 LOU GRAMALDI UITH AOGCC ON PLATFORM TO UITNESS BOP TEST. PERFORMED UEEKLY BOP TESTS. 2.00 ~ORK ON TOP DRIVE AND SERVICE RIG. 2.00 M/U BHA UITH BIT #18. ORIENT MOTOR AND CHECK MUD. 4.50 RIX UITfl BHA. FILL DP AT 4200' AND CASING SHOE. 1.50 ROTARY DRILL FROM 10255~ TO 10260~. 8.00 ROTARY DRILL_L SLIDE FORM 10260~ TO 10295'. DRILLING AHEAD AT REPORT TIME. NOTE: OPEN HOLE LOGS SHO~ED US TO BE IN THE UEST FORLANDS. ~E ~ILL BE MAKING 1 TO 2 MORE BIT RUNS TO TURN THE HOLE TO THE LEFT BEFORE SETTING PIPE. NOTE: HIGH DALLY COSTS INCLUDE SUS CHARGES OF $23,0~O__~FO__-R UN..___~SU_.~C~[SSFUL LOGGING ATTEMPT AND $2~.000 FOR sPERRY-SUN LOGGING RUN. T I M E_.(.H R S.Z_ CUM. RO~. HRS 374.25 ROTATING 1.50 MUD MOTOR 8.00 TRIPPING 5.50 C & C REAMING SURVEYS .JET REPAIRS 2.50 FISHING NIP UP/DOUN /BOP/UH TESTING BOP /UN '3.50 RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA 3.00 RIG UP/TEAR DOUN UAIT ON UEATHER/MAT EVALUATION CORING OTHERS SUEPI ALASKA DALLY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM #A# FIELD MIDDLE GROUND SHOAL LEASE PLATFORM eA# UELL A~1A-11 gORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H /GALLOWAY DR PRESENT ACTIVITY: ROTARY/SLIDE DRILLING PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 10427 DIST. KB TO BHF 38.4 DAY 52 FOOTAGE DRILLED 132 NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 903 UATER DEPTH 80 LAST BOP TEST ~9/~/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 1250 @ 20 PP2 @ KILL SPEED 1950 @ 40 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 2&.O0 ROTARy/SLIDE DRILLING FROM 10295~ TO 10427~. T I M E .(.H_RS_j[ ....... CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAM l NG SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUN OS INSPECT BHA RIG UP/TEAR DOUN UAIT ON UEATHER/HAT EVALUATION CORING 398.25 11.00 13.00 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A# FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: PREPARE TO POH PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~Z~/_~ PRESENT DEPTH 10255 DIST. KB TO BHF 38.4 DAY 49 FOOTAGE DRILLED 102 NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 900 WATER DEPTH 80 LAST BOP TEST g~_~:~_~ LAST CSG TEST ~8_~_~ ./GALLOWAY DR BNA INSPECTION (CUM. ROT MRS) PP1 @ KILL SPEED 1150 @ 20 PP2 @ KILL SPEED 1800 @ 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 23.50 ROTARY DRILL FROM 10153' TO 10255' .50 P E R F 0 R ff_~WD_~U R___~VE Y_.z.._~.C HE~[F[g U_..~.._6 ND_RUMP__D__Ri_ J__O~ .... PREPARING TO POH TO RUN DRILL PiPE CONVEYED LOGS AT REPORT TIME. T l M E _(H_RS_) CUM. ROT. HRS 364.75 ROTATING 23.50 MUD MOTOR TRIPPING C & C REAMING SURVEYS .50 JET REPAIRS FISHING NIP UP/DOWN /BOP/UN TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BNA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS SUEPI ALASKA DALLY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM #A# FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H /GALLOWAY DR PRESENT ACTIVITY: POH WITH DP CONVEYED LOGS PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~L~/9~ PRESENT DEPTH 10255 DIST. KB TO BHF 38.4 DAY 50 FOOTAGE DRILLED NLTA LTN/YTD / EST. DAY 45 SIZE OF LAST CSG Z.O00 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 901 WATER DEPTH 80 LAST BOP TEST g9_L!]/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PPi @ KILL SPEED 100~ @ PP2 @ KILL SPEED 1550 @ ..~4~ SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 3.00 PON UITH BHA AND BIT #16. 1.00 ~[p BHA. 1.00 ~/~U:~RY SUN LOGGING TOOL BHA. 5.00 RIH WITH DRILL PIPE CONVEYED LOGGING TOOLS. FILL DP AT 4200' AND SHOE. SEVERAL TIGHT SPOTS IN OPEN HOLE ON gAY TO BOTTOM WITH TOOLS. .50 BEGAN LOGGING DOWN AT 10144~ TO 10255~ {ID)=. 8.50 LOGGED UP FROM 10255~=~T0 7480' WITH SPERRY SUN DP CONVEYED MEMORY LOGGING TOOL. TIGHT SPOT AT 8796' 1.00 MADE WIPER TRIP TO BOTTOM - NO TIGNT SPOTS IN OPEN HOLE. 2.00 CIRC AND COMO MUD. CHECK FLOW AND PUMP DRY JOB. 2.00 BEGIN TO POH WITH LOGGING TOOLS. IADC BIT GRADE #16 - 4-5-BT-M-F#2-I-ER-LOG T~E_._~RSJ)_ CUM. ROT. HRS 364.75 ROTATING MUD MOTOR TRIPPING ~1.00 c & c 2.00 REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WX RUNNING CASING CEMENTING PICKUP/LAY DO~X DS INSPECT BHA 2.00 RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER Z39930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: ROTARY DRILLING SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 /GALLOWAY DR PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 10056 DIST. KB TO BHF 38.4 DAY FOOTAGE DRILLED 9 NLTA LTH/YTD / EST. DAY ._~6~ LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 898 LAST BOP TEST ~L!~/-~ LAST CSG TEST BHA INSPECTION (CUM. ROT fiRS) PP1 @ KILL SPEED 140~ @ _~ PP2 @ KILL SPEED ~!~ @ 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.00 CONT. SHORT TRIP. 1...~5~ ClRC AND COND HOLE. CHECK FLOg AND PUMP DRY JOB. 3.50 POX WITH BIT #15. TIGHT SPOT AT 8367'. .50 L/D 8HA. ~.00 ~UUL_.~L~2 NIH gITN DUAL PHAZE~LLDTL6M._~S~L~_LOGGING TOOLS. UNABLE TO UOR~ TOOLS PAST 8180'. POH WITH TOOLS. LOST TWO CENTRILIZERS OFF LOGGING TOOLS. RDUL. 2.50 ~/U BHA AND SURFACE TEST MWD. 2.50 RIH WITH BNA. FILL DP AT 4800' AND AT SHOE. TEST MWD AT SHOE. 3.00 CUT AND SLIP 100~ OF DRLG LINE. CHANGE OUT SAVER SUB. 2.00 RIX WITH aHA. WORKED THROUGH BRIDGES OR LEDGES AT 8~5.~[5__2~_AND 973~T 1.50 REAMED OPEN HOLE FROM 9871 TO 10047'. TIGHT HOLE AT 9871~ AND 9907~. .50 CLEANED UP BOTTOM OF HOLE. 1.50 PERFORM MgD SURVEY AND ROTARY DRILL FROM 10047' TO 10056'. CONTACTED BLAIR UANDSELL WITH AOGCC AND RECIEVED PERMISSION TO DELAY WEEKLY BOP TEST UNTIL AFTER LOGGING OR LINER JOB. NOTE: DURING REAM TO BOTTOM SAW RUBBER RETURNS FROM CENTRALIZERS. IADCC BIT GRADE BIT #15 - 8-8-RG-A-E-.I_~2-ER-PR T I ME ~RS2 ....... CUM. ROT. HRS 317.75 ROTATING 1.50 MUD MOTOR TRIPPING 9.00 C & C 1.50 REAMING 2.00 SURVEYS JET REPAIRS 3.00 FISHING NIP UP/DOUX /BOP/WA TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA 3.00 RIG UP/TEAR DOWN WAIT ON WEATXER/MAT EVALUATION CORING OTHERS 4.00 SWEPt ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM UA" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 UORK ORDER 739930 SIDE TRACK ORILL[NG FOREMAN: SELTZ R H PRESENT ACTIVITY: DRILLING PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~9__L~/9~ PRESENT DEPTH 10153 DIST. KB TO BXF 38.4 DAY 48 FOOTAGE DRILLED 97 NLTA LTX/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTX/YTD ___/___ DAYS +/- OEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~99 WATER DEPTH 80 LAST BOP TEST ~9_~/9~ LAST CSG TEST ~8_~Z/9~ /GALLOWAY DR BNA INSPECTION (CUM. ROT HRS') PP1 @ KILL SPEED !~ @ -~ PP2 a KILL SPEED 2150 g 42 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 23.50 DRLG F~Rg~ I__q~O__S~ITg_IO~lS_~J ........ .50 PLATFORM-POSER FAILURE NOTE[ GAS ALARM SOUNDED @ 0100 HRS - CAMP POWER gAS DUMPED DUE TO KATO GENERATOR CAT MOTOR OVER HEATED. ALL PERSONNEL RESPONDED NOTEZ gill RUN SPERRY SUN LOGGING TOOL AFTER BIT RUN #16. T I ME ~.H_RS2 ....... CUM. ROT. HMS ROTAT I NO MUD MOTOR TRIPPING Ic&c REAMING SURVEYS .JET REPAIRS FISHING NIP UP/DOUR /BOP/UN TESTING BOP /gX RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT 8HA RIG UP/TEAR DOWN 341.25 23.50 gAIT ON gEATHER/MAT .... EVALUATION .... CORING ~ OTHERS --'-~ SUEPI ALASKA DALLY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM UA' FIELD MIDDLE GROUND SHOAL LEASE PLATFOR~ UA# WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: ROTARY DRLG. ~.~_/MOTOR PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~9/!~/9~ PRESENT DEPTH 9921 DIST. KB TO BHF 38.4 DAY 45 FOOTAGE DRILLED 68 NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS · DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~96 WATER DEPTH 80 LAST BOP TEST ~9/!~/9~ LAST CSG TEST ~8/~[/9~ /, BHA INSPECTION (CUM. ROT HAS) PP1 g KILL SPEED 950 a 20 PP2 @ KILL SPEED 1550 ~' 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.00 ROTARY DRLG. W 1.25 DEG. MOTOR TO 9857' 3.00 TOOH FOR BIT 2.50 8HA : L/D JARS.=MWDL & MOTOR - P/U STRAIGHT MOTOR & JARS -..L/D ~!~ .... BENT HWDP - CHECK MOTOR 3.00 TIH - FILL PIPE g 4800t & SHOE .50 WASH & REAM TO BOTTOM 14.00 ROTARY DRLG. W~STRAIGHT MOTOR FROM 9857t TO 9921~ NOTE; CIRC. COAL UP AT BOTTOMS UP AFTER TIH GOOD TRIP OUT & IN HOLE IADC DULL GRADE BIT #14 - Z-8-BT-A-F-1-LT&JD-TO&HR CONE LOCKED UP DUE TO JUNK DAMAGE ON SHIRTTAIL OF BIT T i M E_~.It R S2 ..... CUM. ROT. HRS 293.75 ROTATING 15.00 MUD MOTOR TRIPPING 6.00 REAMING .50 SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS 2.50 iNSPECT BHA RIG UP/TEAR DOWN WAIT 014 WEATHER/MAT EVALUAT I014 CORING OTHERS SUEPI ALASKA DALLY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A# WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: SHORT TRIP PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~9_~/9~ PRESENT DEPTH 10047 DIST. KB TO BHF 38.4 DAY 46 FOOTAGE DRILLED 126 NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / OAYS +/- DEP. OF LAST CSG 7765 DAYS'SINCE LAST LTA 897 WATER DEPTH 80 LAST BOP TEST ~1~/9~ LAST CSG TEsT ~8~~ /GALLOWAY DR BHR INSPECTION (CUM. ROT HAS) PP1 @ KILL SPEED 96~ @ 20 PP2 @ KILL SPEED 1540 ~ 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 22.50 ROTARY DRILLED FROM 9921'__T~0~47'. .50 CHECK FLOW AND PuMP DRY JO8. 1.00 RUNNING SHORT TRIPPING TO-LOG AT REPORT TIME. NOTE: TIGHT SPOT IN OPEN HOLE AT 8370'. · T I M E CUM. ROT. HRS ROTAT I NG MUD MOTOR TRIPPING C & C REAMING SURVEYS ,JET REPAIRS FISHING NIP UP/DOWN /BOP/UN TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOWN Og INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING 316.25 22.50 1.OD .50 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: DRILLING PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~Z~Z~ PRESENT DEPTH 9737 DIST. KB TO BHF 38.4 DAY 43 FOOTAGE DRILLED 54 NLTA LTH/YTD ___/___ EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~94 UATER DEPTH 80 LAST 80P TEST 09/13/_~5 LAST CSG TEST 08LOTL95 / BHA INSPECTION (CUM. ROT HAS) PP1 @ KILL SPEED 1200 @ 20 PP2 @ KILL SPEED 1850 @ 40 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : .50 TOOH {LAST 20 STD UET~ 2.00 BHA - L/p 1.~ DEG. MOT~O[.~_STAB'S. & ~ONEL COLLARS - ~/U. 1.25 DEG. MOTOR & MONEL FLEX JTS. 1.00 TEST MUD - NO UORK - PULL - REPAIR - INSTALL .50 BHA - P. pJU JARS & TEST MUD 1.00 RIG REPAIR - BOLTS ON UEAR PLATE ON PiPE HANDLER LOOSE - CHG. OUT BOLTS & SAFETY UIRE SAME. 2.50 TIH TO 5130~ - FILL PiPE & CHECK MUD 1.00 PLATFORM POUER FAILURE 2.00 TIH ' FILL PiPE a SHOE - TIH TO 9609' .50 REAM TO BOTTOM 1.50 ROTARY DRILL U/1.25 DEG. MOTOR FROM 9083' TO 9689' .50 CIRC &CONOITION MUD 10.00 ORLG. FROM 9689' TO 9735~ .50 SURVEY ~MUD JAMMED.~_~._~ORK~PIP.__~E.~__~GgT~SURVg~) .50 DRLG. FROM 9735~ TO 9737~ IADC DULL GRADE BIT #13 4-6-RG-H-E-I-ER&BT-RIG&HRS TIME ~URS~ ..... CUM. ROT. HAS 254.75 ROTATING 12.00 MUD MOTOR TRIPPING 5.00 C & C .50 REAMING .50 SURVEYS .50 JET REPAIRS 2.00 FISHING NiP UP/DOUH /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUN DS 3.50 INSPECT BHA RIG UP/TEAR DOUN ~ gAIT ON UEATHER/MAT EVALUATION CORING OTHERS SUEPI ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM #A# FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A# UELL -A41A-11 UORK OROER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: ORILLING PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~9/~/9~ PRESENT DEPTH 9853 DIST. KB TO BHF 38.4 DAY <4 FOOTAGE DRILLED 116 NLTA LTH/YTD / EST. DAY ~5 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~95 URTER DEPTH '80 LAST BOP TEST ~9/~/9~ LAST CSG TEST ~8/0~/9~ / BHA INSPECTION (CUM. ROT HAS) PP1 a KILL SPEED 1050 @ 20 PP2 a KILL SPEED 1800 @ 40 SUMMARY OF OPERATIONS (SflOU HOURS FOR EACH OPERATION) : 5.50 ORIENT & SLIDE FROM 9737' TO 9763' 18.50 ROTARY DRLG ~/1.25 DEG MOTOR FROM 9763' TO 9853~ T ! M E (_HRS.)_ CUM. ROT. HAS 27'8.75 ROTATING 18.50 MUD MOTOR 5.50 TRIPPING Ic&c REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/UN TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DO~'N DS INSPECT BHA R!G UP/TEAR DOUN UAIT ON UEATHER/MAT EVALUATION CORING SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: DRILLING PROG. DEPTH 12170 ELEVAT. KB TO MSL __.11~=0 DATE PRESENT DEPTH 9587 DIST. KB TO BHF 38.4 DAY 41 FOOTAGE DRILLED 87 NLTA LTH/YTD / EST. DAY SIZE Of LAST CSG 7.000 LTA LTH/YTD / DAYS +/- OEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~9._~ WATER DEPTH 80 LAST BOP TEST 09/1]/9~ LAST CSG TEST ~8/gZ/9~ / BHA INSPECTION (CUM. ROT HRS) PP1 8 KILL SPEED 1080 @ 20 PP2 ~ KILL SPEED 1825 @ 4~ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.00 UA.__~SH_~ R__[EB~=DRLG CMT TO 9499' .50 CIRC& CONDITION MUD 10.00 TIME DRILL OFF PLUG FROM 9499' TO 9519' ~LO__U_UI'~__ 11.50 SLIDE & ROTARY DRLG FROM 9519' TO 9587' NOTE; TOOK ON 30.000 GAL DIESEL FROM NV MONARCH BACKLOADED MISC. DRILLING EOUIPMENT TO MONARCH UNLOADED MISC. DRILLING SUPPLIES FROM MONARCH NOTE[ LOW RATE OF PENETRATION ON BIT #13 DUE TO TIME DRILLING OFF CNT. PLUG o PENETRATION RATE AT REPORT TINE APPROX. 7~/HR CUM. ROT. HRS ROTAT l NG MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAI RS FISHING NIP UP/DOt/N /BOP/WH TESTING BOP /~/H RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON ~EATHER/MAT EVALUATION CORING OTHERS 225.25 7.50 14.00 .50 2.0O SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A# WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: TRIPPING PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 9683 DIST. KB TO 8HF 38.4 DAY 42 FOOTAGE DRILLED 96 NLTA LTH/YTD / EST. DAY ._~ SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- OEP. OF LAST CSG 7765 DAYS SINCE LAST LTA WATER DEPTH 80 LAST BOP TEST ~/~/~ LAST CSG TEST ~8/07/_~ / BHA INSPECTION (CUM. ROT HRS) PP1 g KILL SPEED 1020 ~ ._-2~ PP2 a KILL SPEED 1640 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : Z.O0 ROTARY DRLG. U/MUD MOTOR FROM 9587' TO 9615' 4.50 ORIENT ~ SLIDE FROM 9615' TO 9645' 6.00 ROTARY DRLG. U/MOTOR FROM 9645' TO 9683' NOTE2 WHILE MAKING CONNECTION @ 9683' SAVER SUB FAILED WHEN PICKING UP STRING. DRILL STRING FELL APPROX. 6' AND WAS CAUGHT BY ELEVATORS. 2.00 TOOH TO SHOE - TIGHT SPOTS a 8852~__~43~Z. & 8420' 2.00 RIG REPAIR - CHANGE OUT SAVER SUB 2.50 PUMP PILL & TOON FOR BIT & BHA CHANGE NOTE; FIRE ALARM SOUNDED @ 0940 HRS - WHR #3 FIRE EYE - ALL PERSON- NEL RESPONDED - DO NOT KNOW gHAT SET OFF EYE? NOTE; WELL DID NOT FLOW WHILE SHUT DOWN REPAIRING SAVER SUB. NOTE; POOR OVERALL P# RATE ON BIT #13 DUE TO TIME DRILLING OFF CMT. PLUG. T l M E .~__H RS2. CUM. ROT. HRS 242.75 ROTATING 1,!3- 00 MUD MOTOR trIPPING 4.50 REAMING SURVEYS JET REPAI RS __2.02 FISHING NIP UP/DOWN /BOP/UH .... TESTING BOP /WH RUNNING CASING CEMENTING .... PICKUP/LAY DOWN DS ~_ INSPECT BHA .... RIG UP/TEAR DOWN .... WAIT ON WEATHER/MAT .... EVALUATION SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM UA'* FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UAe WELL A41A-11 WORK ORDER ?39930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: TRIPPING PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 9394 DIST. KB TO BHF 3§.4 DAY _~3~ FOOTAGE DRILLED NLTA LTH/YTD ___/___ EST. DAY ..~4~ SIZE OF LAST CSG 7.000 LTA LTH/YTD . / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA WATER DEPTH 80 LAST BOP TEST ~8/~/9~ LAST CSG TEST ~8_~/9~ / BHA INSPECTION (CUM. ROT HMS) PP1 @ KILL SPEED _~ a ._~ PP2 @ KILL SPEED 1260 @ ._~ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 4.50 RIG REPAIR - CHANGE OUT BRAKE BANDS 1.50 TIH 3.50 'CIRC & CONDITION MUD [COULD ONLY PUMP 40 SPN[ 4.00 TOOH 1.00 BHA 4.00 TIH U/OPEN ENDED DRILL PIPE 2.50 CIRC& CONDITION MUD (CHANGE SHAKER SCREENS TO 140'S) 2.00 HOLD PRE-JOB SAFETY MEETING - PUMP 8 BBL #4 DI[~E[. 8 BBL SOAPY H20~__ 100 SX CLASS G CMT g[.6~ CFR2 & .06% HR5,::~.~ B~ SOAPY H2Oz__& 1.4 BBL #~:~~_65.5 BBL 11.( PPG MUD - EST TOP OF CMT 9394~ - CMT IN PLACE a 0454 HRS. 1.00 TOOH NOTE; WELL FLOWING 1/3 BBL PER HR. CUM. ROT. HMS 203.75 ROTATING MUD MOTOR TRIPPING 10.50 C & C 6.00 REAMING SURVEYS REPAIRS 4.50 FISHING NIP UP/OOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING 2.00 PICKUP/LAY DOWN DS 1.0.0 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT .... EVALUATION ~__ CORING .... OTHERS .... SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "Au PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~Z!~/9~ FIELD MIDDLE GROUND 'SHOAL PRESENT DEPTH 9394 DIST. KB TO BHF 38.4 DAY 40 LEASE PLATFORM "A# FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 WELL A41A-11 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- WORK ORDER 739930 DEP. OF LAST CSG ?765 DAYS SINCE LAST LTA ~9._J.1 SIDE TRACK WATER DEPTH 80 LAST BOP TEST ~]/~ LAST CSG TEST ~/~Z/9~ DRILLING FOREMAN: SELTZ R H / BHA INSPECTION (CUM. ROT HAS) PRESENT ACTIVITY: gASH & REAM PP1 @ KILL SPEED .... @ 22 PP2 @ KILL SPEED @ 40 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 5.00 TOOH ~OPEN ENDED DRILL PIPE - INSPECT DRILL PIPE HARDBAND & PIN OD - J. TIME_~RS2 ....... LAY DOWN BAD JTS CUM. ROT. HAS 203.75 .50 RIG REPAIR ~IRON ROUGHNECK~ ROTATING 2.50 FINISH TOOH ~[DRILL PIPE - NOTE[ LAYED DOWN 16 JTS WITH WORN HARDBAND MUD MOTOR AND 9 JTS WITH MIN. PIN OD TRIPPING 13.50 2.___:~ RJU HUDP OFF RACK - CIRC C & C 4.50 PULL gEAR BUSHING - TEST BOPS REAMING 1.00 2.00 BHA - M/U MOTOR & MUD SURVEYS 6.00 TIH - FILL PIPE g ~500~ & SHOE JET 1.00 WASH &-REAM REPAIRS .50 FISHING NOTE; WELL DID NOT FLOW WHILE TESTING BOPS NIP UP/DOWN /BOP/WH TESTING BOP /WH 4.50 FIRE ALARM SOUNDED g 1430 HAS - WELDER WORKING UNDER BAY 6 - RUNNING CASING LIGHT REFLECTED TO FIRE EYE & SET OFF ALARM - ALL PERSONNEL CEMENTING RESPONDED. PICKUP/LAY DOWN DS -~-'~ INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE FIELD MIDDLE GROUND SHOAL PRESENT DEPTH 9777 DIST. KB TO BHF 38:~ DAY ~3~ LEASE PLATFORM "A" FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY UELL A41A-11 SIZE OF LAST CSG 7.000 LTA LTH/YTD . / DAYS +/- UORK ORDER 739930 DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~88 SIDE TRACK ~ATER DEPTH 80 LAST BOP TEST ~/9~ LAST CSG TEST ORILLING FOREMAN: UELLS R V / BHA INSPECTION (CUM. ROT HRS) PRESENT ACTIVITY: JARING ON FISH~ SEVERED AT 9777 PPl@ KILL SPEED 134~ @ _~ - pP~ @ KILL SPEED 1780 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 5.50 JAR ON FLS__~_H~_C__I~/__C.~ND MUD. - ..... --T~E---~2 ....... 2.00 PUMP P~_..RIG DO~N CIRC LINE.~_.~LRIG UP DIA-LOG. CUM. ROT. HRS 203.75 9_...:.~ ~IH__~/~ SHOT PERFORATOR AND SHOOT 9815~T/98~8~ST BELOU BOTTOM STAB ROTATING POH, MAKE UP 600 GRAIN STRING SHOT/FREE POINT COMBO TOOL~__RIH. TOOK MUD MOTOR FREE POINT READING~ TORQUE ONL__~YTOOL UOULD NOT SET PROPERLY IN THE TRIPPING MORELS FOR STRETCH READINGS. APPEARED TO HAVE A LITTLE UIGGLE JUST C & C BELOU THE TOP STAB AND SAME AT BOTTOM OF TOP MOREL DC. PULLED TOOLS REAMING .... ____ ~[21500~,_ TORQUED STRING TO 14 TURNS RIGHT HAND TORQUE TO TIGNTEN SURVEYS STRING THEN UORKED 9.5 TURNS LEFT HAND TORQUE DOUNHOLE. RIH_~/COMBO JET TOOLS. FIRED STRING SHOT AT 98O7'. NO SURFACE INDICATIONS OF A BACKOFF REPAIRS POH ~T~L~Sz._SHOT HAD FIRED OK. ~ORKED STRING TO BACKO~[: NO SUCESS. FISHING 24.00 1.50 UORK STRING UHILE BUILDING DIA-LOG SEVERING SHOT. NIP UP/DOUN /BOP/UH 3.00 RIH U/~_S~ERING TOOL.c_~SEVERED BHA AT THE BOTTOM OF THE TOP STABS PIN. TESTING BOP /UH 9777'. POH ~D._~.[~-LOG TOOLS. RUNNING CASING 3.00 CIRC AND JAR ON FISH...UE ARE SEVERED AT BOTTOM OF THE STAB SCREUED CEMENTING ONTO THE JARS THAT ARE UORKING GOOD. SPOT FRESH #4 DIESEL AROUND FISH PICKUP/LAY DOUR DS ..... PUMP 30 BBLS AT 1BBL EACH HIM AT RPT TIME. INSPECT BHA ..... RIG UP/TEAR DOUN UAIT ON UEATHER/MAT .... EVALUATION .... CORING OTHERS SUEPI ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM "Aa FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A" NELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: ~ELLS R V PROG. DEPTH 12170 PRESENT DEPTH 9724 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 ~ATER OEPTH 80 / PRESENT ACTIVITY: SHORT TRIP T/SHOE ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 38 NLTA LTH/YTD _~/_~ EST. DAY ._~ LTA LTH/YTD ___/___ DAYS +/- DAYS SINCE LAST LTA LAST BOP TEST ~8_Z~/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PPi @ KILL SPEED 875 g 20 PP2 a KILL SPEED 1320 a 40 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 2.00 JAR ON FISH. FINISH PUMPING ~4 DIESEL AROUND FiSH AT 1 BBL/MIN STAGES. 6.00 RIG UP DIA-LOG,_UORK ? TURN OF LEFTHAND TORQUE INTO STRIqG, LET OUT 2. NIH U/600 GRAIN STRING SHOT ~/TOP OF DAILEY JARS AT 9741~. PUT IN THE 2 TURNS OF LEFTHAND TORQUE. FIRED SHOT. POH ~/DIAoLOG AND LAY DOUN TOOLS[RIG THEM DO~N. BACKED OFF AT 9741' OK. 9.50 POH, LAYED DO~N 2 JTS ~UDP RECOVERED FISH. MAKE UP CLEANOUT BHA,~_~IH TAG BRIDGE AT 8792'. 1.50 UASN/REAM THRU TIGHT SPOTS AT 8792' AND 9653'. CLEANED OUT T/9724~. ENCOUNTERED TORQUIE CONDITIONS THERE. POSSIBLE PUSHED THE 1' 07_5_~4_~_" BROKEN UALL NOOK TO THERE. GOOD DEAL IF ~, UILL CEMENT IT IN PLACE. (.00 ~)RC/COND FOR SHORT TRIP MUD NEEDS QUITE A BIT OF UORK ON IT AFTER ALL THE TRIPS FISHING AND HAVENT CIRC MUCH TO KEEP IT IN CONDITION. 1.00 pUMP PILL,=PULL T/SHOE AT RPT TIME. HOLE IN GOOD CONDITION CONNING OUT LOST IN HOLE EQUIPMENT ANADRILL: 2-4 ~/4" MQNEL .DC~S, I STEEL "QUICK CHANGE" STAB I N~.._STAB. SER #'S:_~[97', 570~ ...... 137 ....................... 60~6 DAILEY: 1 SET 4 .~/4" JARS SER #1400-1174 CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING 10.50 I c&c ~.oo REAMING 1.50 SURVEYS dET REPAIRS FISHING 8.00 NIP UP/DOUR /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING .... PICKUP/LAY DOgN DS INSPECT BHA .... RIG UP/TEAR DOUN ...... UAIT OH UEATHER/MAT .... EVALUATION .... CORING .... OTHERS .... UEATHERFORD: 1-4' 3_/4" BIT SUB SER #30546 TODAYS COST REFLECTS LOST IN HOLE EQUIP AND DIA-LOG'S COSTL_~9___8:~O._~O__- 203.75 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN.: WELLS R V PRESENT ACTIVITY: ~R_/WORK ON FISH AT 9680' PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 9846 DIST. KB TO BHF 38.4 DAY _~ FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA UATER DEPTH 80 LAST BOP TEST g~][/95 LAST CSG TEST / BHA INSPECTION (CUM. ROT HRS) PR1 @ KILL SPEED @ 20 PP2 @ KILL SPEED @ 40 SUMMARY OF OPERATIONS (SHO~ HOURS FOR EACH OPERATION) : 4.50 FINISHED BUILDING NEU 600 GRAIN STRING SHOT. NIH W/DIA-LOG [~9_.680~ DP MEASUREMENT...gz11~ ~IRELINE MEASUREMENT. HAD 9 TURNS LEFTHAND TORQUE IN STRINg, FIREp ~O,_~T~_...H_~HAD POSITIVE SURFACE INDICATIONS OF BACKOFF. pOH _~Lg_~6-1.~x_RIG THEM ASIDE. 12.00 WORE MORE LEFTHAND TORQUE DOWN TO FINISH UNSCREUING AT 9680'. PULLED 325K TO GET STRING MOVING OUT OF ITS "RUTS" FROM JARING. PO~_~AYED DOWN FISHING TO~LS..~..,__RECOVERED 25' TUISTED OFF JOINT OF 3 I[~"._...~D~, 11 JTS :DP,. ~8 JTS OF 3 1/2" HWD~z__.P_.O_PO__SUB..~MOVED THE 11 JTS RECOVERED AND 3 STANDS ABOVE FISHING TOOLS UP INTO MIDDLE OF THE STRING UHERE IT WILL BE IN TENSION AT ALL TIMES2 MAKE UP SCREW-IN SUB ON BS~A_.~R~ .... 18 HWDP~ ACCELE~BTO~, 9_~UO~:T~._~.TZ~80~L~__HAD TO WASH/WORK 10' THRU BRIDGE, UASH~WORK THRU BRIDGE AT 9136, 9232 NOT MUCH PROBLEM THO. 3.00 ~IRC~COND HOLE~MUD PRIOR TO ENGAGING FISH. ~.50 SCREW INTO FISH_~T 9_~_680__~.~_UNABLE TO CIRC. JAR/WORK ON FISH. CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING c&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOgH gAIT ON UEATHER/MAT EVALUATION CORING OTHERS 203.75 24.00 SWEPI ALASKA DALLY DRILLING REPORT PAGE I OF 1 RIG HAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UE[.L A41Aoll UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: ~IRCL~_OND_.LflB[_~ON PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~9/~/9~ PRESENT DEPTH 9846 DIST. KB TO BHF 38.4 DAY 36 FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA WATER DEPTH 80 LAST BOP TEST ~J9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.00 JAR ON FISH, UNB~LE TO CIRC. 13.00 EIG~UP_DIA-LOG, MADE_DR~FT RUN T/4~ 6BOV_~_E BlT SUez 9839'. PLUGGED SOLI~D THERE. PO~.z.._.~MAKE UP 5 SHOT PERFORATORz NIH. PERF 9829' T__~32~ POH, RIG DIA-LOG ASIDE. 2.50 ATTE~PT.___.~TOC!RC:_NO=SU._g.C[~S...:_. JAR ON FISH~ FISHING JARS FADING FAST..NOW APPEARS THAT THE DRILLING JARS HAVE STARTED HITTING NOg! VERY HARD TOO T l M E ..(__H R S)_ ..... CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING REAM I NG SURVEYS JET REPAIRS FISHING NIP UP/DOIJN /80P/IJH TESTING BOP /UX RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA RIG UP/TEAR DOUN gAIT OX UEATHER/MAT EVALUATION CORING _ 5.50 RIG DIA-LOG ~L~ SHOT PERFORATO~ NIH_AND PERF 3' BELOW THE TOP STAB AT 9780'T/9783-. PO~,= RIGDIA-L~g ASIDE. 1.00 MAKE UP CIRC LIHE~__~STA~IS~ CIRCULATI~I C~C/COND AND ALTERNATLY JAR ON FISH...JARS HITTING VERY HARD AT THIS TI~. UORKING GOOD. @ 20 @ 40 203.75 24.00 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING. FOREMAN: WELLS R V PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~Z~Z~-~ PRESENT DEPTH 9846 DIST. KB TO BHF 38.4 DAY ~3~ FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY ..~4~ SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 884 WATER DEPTH 80 LAST BOP TEST 98/~/_~ LAST CSG TEST / BHA INSPECTION (CUM. ROT HRS) PRESENT ACTIVITY: JAR ON FISH. .~OP._.~_AT 8440' PP1 @ KILL SPEED 750 @ ..~2~ PP2 @ KILL SPEED 1350 a SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 2.00 FINISH TIH ~L~ALLHOOK ASSMY_..T/8440' TOF.__ 1.50 ATTEMPT TO WORK OVER AND ENGAGE FISU. NO SUCESS. 9.50 PO~, LEFT it OF THE WALLHOOK IN THE HOLE. CONTROL RING HAD BEEN RUN ON INSTALL NEW CONTROL GUIDE RING ULCLUSTERITE ~AC[~_NEW WALLHOQK._TIH. 1.00 FOUND TOF, .MILLED OVER TOP, ENGAGED FISH. 10.00 JAR ON FISH, PU~PED A HI-VIS/WEIGHT 40 BBL PILL AROUND. INDICATIONS___ ARE WE ARE CIRC THRU THE BIT AS WELL AS THE OVERSHOT ,~WHICH DOES NOT HAVE .A PACK-OFF DUE TO WELDING THE CLUSTERITE.~ DIA-LOG WILL BE ON THE FIRST AVAILABLE HELICOPTER TO BACKOFF AS DEEP AS WE CAN BELOW OVERSHOT CUM. ROT. HRS 203.75 ROTATING MUD MOTOR TRIPPING C & C REAM I NG SURVEYS .... JET .... REPAIRS FISHING _2E-O0 NIP UP/DOWN /BOP/WH _--- TESTING BOP /WH __--- RUNNING CASING CEMENTING PICKUP/LAY I~OWN DS INSPECT BHA .... RIG UP/TEAR DOWN WAIT ON WEATHER/MAT ~____ EVALUATION CORING ~__- OTHERS SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PROG. DEPTH 12170 PRESENT DEPTH 9846 FOOTAGE DRILLED SIZE OF LAST CSG 7-000 DEP. OF LAST CSG 7765 WATER DEPTH 80 / PRESENT ACTIVITY: ATTEMPTING BACKOFF AT 9680' SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 4.00 JAR ON FISH WHILE WAITING ON DIA-LOG. ELEVAT. KB TO MSL 116.0 DATE ~9_/~/9~ DIST. KB TO BHF 38.4 DAY 34 NLTA LTH/YTD / EST. DAY 45 LTA 1TH/YTD / DAYS +/- DAYS SINCE LAST LTA 885 LAST BOP TEST ~/_~ LAST CSG TEST ~Z~ BHA INSPECTION (CUM. ROT fiRS) PP1 @ KILL SPEED 75~ @ 20 PP2 @ KILL SPEED 1340 g 40 20.00 RIG UP DIA-LOG. RAN FREEPOINT AND 600 GRAIN STRING SHOT. UNABLE TO GET PAST TOP OF DRILL COLLARS AT 8220'. POH REDUCED SPRING TENSION ON TOOLS. RAN IN HOLE T/PUMPOUT SUB AT 8803'z UNABLE TO WORK BELOW THERE. PIPE IS FREE 8803'. POHx TOOK ALL SPRING TENSION OUT OF TOOLS. NIH ~[FREE POINT/STRING SHOT COMBO. FREE POINT IS 2ND JT ABOVE THE JARS AT 9680'. PULLED UP T/NEAR SURFB~E~LTOgLS,_~gRKED LEFTHAND TORaUE~_~_ ]URNS D~N,_LET_~UTIT~N_,- RUN IN .~gL[_~/S~T__~L96~._ADD 1 TURN SIGNAL SNOT TO FIREZ NO SURFACE INDICATIONS OF A BACK-OFF. POH WITH [O0~x__~OT DID NOT FIRE. BUILDING SHOT #2 AT RPT TIME. MR. BLAIR WONDZELL OF AOGCC APPROVED POSTPHONING BOPE TESTING UNTIL DONE FISHING. T I M E_£_H R__S)_ ...... CUM. ROT. HRS 203.75 ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING 24.00 NIP UP/DOWN /BOP/WH TESTING BOP RUNNING CASING CEMENT ING PICKUP/LAY DOUN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING nTNFR~ SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: UELLS R V PRESENT ACTIVITY: FLUSH OUT BHA PROG. DEPTH 12170 PRESENT DEPTH 9825 FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 ~ATER DEPTH 80 / ELEVAT. KB TO MSL 116.0 DATE ~9__L~/9~ DIST. KB TO BHF 38.4 DAY 31 NLTA LTH/YTD ___/___ EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA LAST BOP TEST gB/]~L~ LAST CSG TEST ~8.BJ_g_~/9~ BHA INSPECTION (CUM. ROT HRS) PR1 ~ KILL SPEED @ 20 PP2 @ KILL SPEED @ 40 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 1.50 FIHISHE~ CIRC[gO~D__[/SHORT TRIP AND PULLED ~[SHOE. 1.50 SERVICE RIG. CHECKED OUT BRAKE BLOCKS ON D~[~,~LREADJUST BLOCKS. 1.50 TTH T/TOP_QO[=FISH. UASHL~~531'. 4.50 CIRC/COND MiX AND PUMP HI VIS 15 PPG S~EEP. 7.00 POH~, HAKE UP SNORTER UALL HOOK~_~/BORED OUT [.D.~__ON OVERSHO__~_9.]~T _TIH. 1.00 M/U ~P DRIV[, UORK PAST SEVERAL LEDGE_SL_ENGAGED FISH, INSIDE OF FISH ~AS PLUGGED, UNABLE TO CIRC. 5.50 HIT JARS 1 LICK.~__FISH FREE, PULLED UP ~L~ALLHOOK.c_~BA_g.CKED OFF OVERSHOT AND ~ALLHOOK ASSM¥,_~AYED DO~N 7~ STUB OF PARTED DRILL PIPE AND TOOLS. 1.50 POH ~/R~ OF STRIN~ BR~KE OFF BIT AND UNPLUGGING BHA AT RPT TINE. TIME ~R~SI_- CUM. ROT. HRS ROTATING MUD MOTOR TRIPPIHG C&C REAMING SURVEYS JET REPAIRS FISHING NiP UP/DO~N /BOP/~H TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA RIG UP/TEAR DOUN ~AIT ON ~EATHER/MAT EVALUATION CORING OTHERS 199.25 24.00 S~EPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" ~ELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: ~ELLS R V PRESENT ACTIVITY: TIH g/~ALLHOOK-OVERSHOT ASSMY PROG. DEPTH PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 ~ATER DEPTH 80 / 12170 ELEVAT. KB TO MSL 116.0 DATE ~9_L_Q~/9~ 9846 DIST. KB TO BHF 38.4 DAY NLTA LTH/YTD ___/___ EST. DAY 4~ LTA LTH/YTD ___/___ DAYS +/- DAYS SINCE LAST LTA 883 LAST BOP TEST g8/~/9~ LAST CSG TEST ~8/~/_~ BHA INSPECTION (CUM. ROT HRS) PP1 a KILL SPEED PP2 ~ KILL SPEED SUMMARY OF OPERATIONS (SHOg HOURS FOR EACH OPERATION) : 2.50 TIH ~/B~A.~FLUSH OUT ~/MUD PUMPS. POH. 5.00 MAKE UP NE~ BIT ON B~A TIH. TAGGED UP AT 8770'. 3.00 ~ASH~REAM THRU BRIDGES/IEDEGES F/~7~O' T~98~5[. : __ 4.50 ORILIlNG ~.~T #12 F/~25~:T/9846~. 3.50 T~ISTED OFF. POH. RECOVERED 8440' OF DRILL PIPE. TOF IS 8440~. FISH IS ~]T #~Z~_BIT_ SUB U/FLOAT~ MONEL ~C.~.~._.N.NM~TAB, MON£L DC.~,c__~STABL_pAILEY ~ARS~ 3~ JTS HUDP, P.O. SUB, 11JTS DRILL PiPE AND A 25.33' STUB OF DP 1.50 SLIP/~UT DRI~I~G_L&NE, SERVICE RIG.. 4.00 MAKE UP FISHING TOOLS, TIH AT~R~TiTI~E.: RECONITION TO ALL THE ~EATHERFORD FOLKS ~HO ~ORKED THRU THE LABOR DAY ~EEKEND GIVING US EXCEPTIONAL SUPPORT DURING OUR FISHING JOB. CUM. ROT. HRS ROTATING 4.50 MUD MOTOR TRIPPING 15.00 REAMING 3.00 SURVEYS JET REPAIRS FISHING NiP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA RIG UP/TEAR DOUN UAIT ON ~EATHER/MAT EVALUATION CORING nT~g~ 1.50 203.75 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM ~/ELL A41A- 11 WORK ORDER 739930 SUEPI ALASKA DAILY DRILLING REPORT PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 PRESENT DEPTH 9825 DIST. KB TO BHF 38.4 FOOTAGE DRILLED 27 NLTA LTH/YTD / SIZE OF LAST CSG 7.000 LTA LTH/YTD / DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~80 PAGE 1 OF 1 DATE ~9/~/__~ DAY 29 EST. DAY 45 DAYS +/- SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: TIH ~/OVERSHOT ASSMY BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED WATER DEPTH 80 LAST BOP TEST ~8_~!/~[ LAST CSG TEST ~8/~Z/9~ ~ 30 @ 50 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 4.00 DRILL F/9798'_~./9825' ~L~IT #11 4.00 TUISTED OFF. PULLED ~/_.~.~.~E._~IJMP PILL POX. RECOVERED 8520t OF STRING. LEFT iN HOLE; 105t OF BHA~.,~S NOTED ON YESTERDAYS REPORT AND 1200~ OF 3 ~/2" DRILL PIPE. TWISTED OFF JT WAS 24.88~ LONG. FAIRLY CLEAN BREAK IN PIPE BODY. ~40 JTS AND A 5' STUB OF DP LEFT IN HOLE PLUS THE BHAZ_- 4.50 U/U_~ISHING ASSMY TI~T/~889~TAGGED UP. 1.50 ~AS~/_~6~I:/TS89~ T/8491~. MANY BRIDGES TO REAM THRU. 1.50 CIRC HOLE CLEAN PRIOR TO ATTEMPT ENGAGING FISH. LOTS OF LARGE PIECES OF COAL RECOVERED OVER SHAKERS. 1.5~ WORKED DOWN TO FISH~ TAGGED IT AT 8531', ATTEMPT TO ENGAGE FIS~=D~D~_ NOT HAVE SUCCESS. 1.00 CIRC HOLE CLEAN ABOVE FISH. T I ME (_HR_S)_ CUM. ROT. HRS ROTAT I NG MUD MOTOR TRIPPING Ic&c SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/WH TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOUR DS INSPECT BHA RIG UP/TEAR DOUN WAIT ON UEATHER/MAT EVALUAT [ ON CORING OTHERS 3.00 POH ~OVERSHOT ASSSMY. LIP GUIDE WAS BENT. LAY DOWN LIPGUIDE. 3.00 U/U WALL H00~.~_5__3/~" AND ADJUST KNUCKLE JL!/OEIENT ~/~OK. TI~AT REPORT TIME. 199.25 4.00 20.00 SUEPI ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM "Au FIELD MIDDLE GROUND SHOAL LEASE PLATFORM ~A" UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PROG. DEPTH 12170 PRESENT DEPTH 9825 FOOTAGE DRILLED SIZE OF LAST CSG Z.O00 DEP. OF LAST CSG 7765 UATER DEPTH 80 / PRESENT ACTIVITY: C[RCZ~OND F__/SHORT TRIP SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 3.00 1.00 ~LIP/CUT DRILLING LINE 100~. ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 30 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 881 LAST BOP TEST ~8/~/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HMS) PP1 @ KILL SPEED 620 g 20 PP2 a KILL SPEED 1020 g 40 4.00 GO INTO OPEN HOLE WORK PAST/THRU LEDGESL~R.._~I~ES 1'[8310. UNABLE TO GET OEEPER. 7.00 POHx_LAY DOUN FISHING ASSMY. M/U CLEANO~UT ASSM~Y~__TIH: TAG UP AT 8185'. 6.00 CLEAN OUT BRIDGES/WORK OVER LEDGES F_.~5' T/8531' TOP OF FISH. 3.00 MIX AND PUMP 15.0 PPG VISCOUS ~0 BBL PILL,,~__C_~.IRC~ONDFOR SHORT TRIP. T I~E::(H_RS2_ CUM. ROT. HRS 199.25 ROTATING MUD MOTOR TRIPPING 10.00 c & C 3.00 REAMING 10.00 SURVEYS ,JET REPAIRS FISHING #IP UP/OOUN /BOP/WH TESTING BOP /UH RUNNING CASING ~- CEMENTING ~- PICKUP/LAY DOUR DS .... INSPECT BHA RIG UP/TEAR DOUR UAIT ON UEATHER/MAT EVALUATION CON I NG ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "'Aa l/ELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: WASHING/REAMING AT 9181' PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~/~/_~_~ PRESENT DEPTH 9755 DIST. KB TO BHF 38.4 DAY _~2~ FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY ,.~4~ SIZE OF LAST CSG 7.000 LTA LTH/YTD ___/___ DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA WATER DEPTH 80 LAST BOP TEST 9~!/~ LAST CSG TEST / BHA INSPECTION (CUM. ROT XRS) PPi @ KILL SPEED 119~ PP2 @ KILL SPEED ~ SUMMARY OF OPERATIONS (S.HOI/ HOURS FOR EACH OPERATION) : 1.00 DROP DUAL SINGLE SHOT SURVEY TOOLS. 3.50 PON U~BIL.~_T.~.~.__~LASI'~STDS CAME WET. 1.50 STAND HWOP BACK ON LEFT SIDE OF DER~CK~_L/D_JA~, STAB~_BI~T SU~B!~ 4.00 DID WEEKLY BOPE'TEST. 1.00 ~AKE_UP N~W._~BH_.~.A: MOTOR A~SMY ~_/_.~UO.__ 3.50 TIH,_.~ILLED PIPE_AT 3950~ AND AT SHOE. 1.00 TAG UP AT 8376~, M/U TOP DRIyE, PACKED OFF, STUCK. WORK~/JARED LOOSE. PULLED UP T/8237~ W~MANY TIGHT SPOTS. 1.50 CIRC/COND MUD, WgR~.ANDR~TATE STRING AT 8237~ TO 8200~.____ 7.00 [EAM~WA~ F/8237' T/~)81': QRILLED THRU BRIDGES AT 8476' AND 8540'. GOING BETTER BELOW 85~0~. BIT #9 COND: 4-4-BT-A-F_~_~3)-I-ER-HRS TIME ~RS1 CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C&C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOI/N /BOP/I/H TESTING BOP /l/H RUNNING CASING CEMENTING PICKUP/LAY DOI/N DS INSPECT BHA RIG UP/TEAR DOl/N l/AIT ON l/EATHER/MAT EVALUATION CORING OTHERS 186.75 9.SC~ 1.50 7.00 I .00 1.00 4.00 ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM #A FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 I/ORK ORDER 739930 SIDE TRACK DRILLING FOREMAn: WELLS R V PROG. DEPTH 12170 ELEVAT. KB TO MSL PRESENT DEPTH 9798 DIST. KB TO BHF FOOTAGE DRILLED 44 NLTA LTH/YTD SIZE OF LAST CSG 7~000 LTA LTH/YTD DEP. OF LAST CSG ~765 WATER DEPTH 80 /. PRESENT ACTIVITY: DRILLING AHEAD W/BIT ~11 116.0 DATE ~9/~/9~ 38.4 DAY 28 / EST. DAY 45 / DAYS +/- DAYS SINCE LAST LTA 879 LAST BOP TEST 98_~!/_~ LAST CSG TEST BHA INSPECTION (CUM. ROT fiRS) PP1 g KILL SPEED 98~ ~ 30 PP2 ~ KILL SPEED 1400 @ 50 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 3.50 FINISHED REAMING F/9181~ T/9755~o TOOK MWD SURVEYS AT 9466~= 95~.~z____ 9659~ AND AT 9755~. (BIT DEPTHS) 5.00 ATTEMPTING TO SLIDE/ROTARY DRILL F/97~5~ T/gZZ8~ W/BIT #10. UNABLE TO MAINTAIN MUD SIGNAL LONG ENOUGN TO SLIDE. 12.00 PULLED T/~HOg.:D~9~:BAR AND~EAR..OU~ pUMP-OUT~UB, PUM~::PILL.~.~POH. LAY DOWN j~L_.~FOUND SEVERAL PIECES OF COAL JAMMING TOOL) MAKE UP 30' DROPPING RSSMY. TIH. FILL PIPE AT 3950' AND AT SHOE. CIRC AND SHEAR MUD AT SHOE WHILE SERVICE RIG AND TOP DRIVE. RUN ON IN ~LE~ ~EAM THRU BRIDGE AT 8885' T/8890'. (HAD. LEDGES/BRIDGES AT 8341'. 8885' AND 9283' 3.5~ DRILL [/9778' T/9798' W/BIT #11. BIT #10 COMO: 2-2-WT-A-E-I-CT-MI/O (DEBRIS IN MUD2 T I _HE(HRS.). CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/I/H TESTING BOP RUNNING CASING CEMENT'ING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR OOI,/N 1/AlT ON WEATHER/MAT ..... EVALUATION CORING OTHERS 195.25 6.50 2.00 12.00 3.50 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: IaELLS R V PROG. DEPTH 12170 PRESENT DEPTH 9530 FOOTAGE DRILLED 115 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 /GALLOUAY DR PRESENT ACTIVITY: JUST GETTING ON BOTTOM SUMMARY OF OPERATIONS (SHOia HOURS FOR EACH OPERATION) : 12.50 DRILL [/9415' T/9530' k//BIT #8 1.00 DROP DUAL SINGLE SNOT SURVEY TOOLS. 10.50 TRIP F/NEia BII'._~ET!~NG_gN__~TTOM AT RPT TIME. BIT #8 COND: 2-3-IaT-A-E-I-LT=T__~QZ~RS ELEVAT. KB TO MSL 116.0 DATE ~L~/9~ DIST. KB TO BHF 38.4 DAY 25 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 876 LAST BOP TEST 9~L~E/'~ LAST CSG TEST 9~L~Z/__~_~ BHA INSPECTION (CUM. ROT MRS) PP1 @ KILL SPEED 1000 @ 20 PP2 @ KILL SPEED 1375 @ 40 T I M E ...(.H R__S2 CUM. ROT. MRS ROTATING MUD MOTOR TRIPPING C &C REAM I NG SURVEYS ,JET REPAIRS FISHING NIP UP/DOIaN /BOP/IaH TESTING BOP /iaH RUNNING CASING CEMENTING PICKUP/LAY DOIaR DS INSPECT BHA RIG UP/TEAR DOiaN iaAIT ON IaEATHER/MAT EVALUATION CORING OTHERS 162.75 12.50 ~0.50 1.00 SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" UELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: DROPPING SURVEY PROG. DEPTH 12170 PRESENT DEPTH 9755 FOOTAGE DRILLED 225 SIZE OF LAST CSG 7'000 DEP. OF LAST CSG 7765 UATER DEPTH 80 /GALLOUAY DR SUMMARY OF OPERATIONS (SHOia HOURS FOR EACH OPERATION) : 24.00 ROTARY DRILLING FROM 9530' TO 9755~ ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 26 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 877 LAST BOP TEST 98__~E/_~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 850 @ ._.~2~ PP2 @ KILL SPEED 1260 PREPARING TO DROP SINGLE SHOT SURVEY AT REPORT TIME. NOTE: DAILY COSTS INCLUDES $20M OF 5" CASING COSTS - CUTTING STL THREADS. T I ME (HRS CUM. ROT. HRS 186.75 ROTATING 24.00 MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOIaN /BOP/laH TESTING BOP /lan RUNNING CASING CEMENTING PICKUP/LAY DOiaN DS INSPECT BHA RIG UP/TEAR OOiaN k/AlT ON IaEATHER/MAT ..... EVALUATION .... CORING _~- SgEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "'Au FIELD MIDDLE GROUND SHOAL LEASE PLATFORM gELL A41A-11 UORK ORDER 739930 SIDE TRACK _ DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: ROTARY DRILLING PROG. DEPTH 12170 PRESENT DEPTH 9283 FOOTAGE DRILLED 135 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 /GALLOgAY DR SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 1.50 ROTARY DRLG. FROM 9148t TO 9156' 1.00 CIRC. &.SURVEY (ANGLE ONLY) 4.00 TOOH (GOOD TRIP THROUGH OPEN HOLE) 1.50 BHA -.,LID STEELS '.,,,P/U MOTOR & MUD 3.00 TIH_U/MOTOR - FILL PIPE @ 4400' & SHOE ELEVAT. KB TO MSL 116.0 DATE ~/'9~ DIST. KB TO BHF 38.4 DAY 23 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA ~7._~4 LAST BOP TEST ~8/~/9~ LAST CSG TEST ~8_~/9~ BHA INSPECTION (CUM. ROT HMS) PP1 @ KILL SPEED 1200 @ 20 PP2 @ KILL SPEED 1780 @ 40 .50 REAM TO BOTTOM FROM 9076' - ATTEMPT TO._~SUR~V~.~NO GOO~D _~UD TO THICK 1.00 DRLG. ~/MOTOR FROM 9156t TO 9171~ .50 MUD PUMP PROBLEMS 11.00 DRLG. ~/MOTOR FROM 91~1~ TO 9283' IADC DULL GRADE BiT #6 - 7:8-B~A,H~H~E-4=~G&ER-TO NOTE; RUNNING MUD MOTOR IN ATTEMPT TO INCREASE P RATE - DID NOT MAKE ANY DIRECTIONAL CORRECTIONS. TIME [URS2 ....... CUM. ROT, HRS 136.75 ROTATING 13.50 MUD MOTOR TRIPPING 7.00 I c&c 1.oo REAMING .50 SURVEYS JET REPAIRS .SO FISHING NIP UP/DOgN /BOP/gH TESTING BOP /gH RUNNING CASING CEMENTING PICKUP/LAY DOgN DS INSPECT BHA 1.50 RIG UP/TEAR DOgN gAIT ON gEATHER/MAT EVALUATION CORING OTHERS SgEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM gElL A41A-11 gORK ORDER 739___..~930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: DRILLING PROG. DEPTH 12170 PRESENT DEPTH 9415 FOOTAGE DRILLED 132 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 /GALLOgAY DR SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 8.50 ROTARY DRILL ~/1 1/4 DEG MOTOR FROM 9283~ TO 9370' 1.0~ CHECK FLOW AND PUMP DRY JOB. 3.50 POH UITH BHA AND BIT #7. .50 ~D/_.~_.~_~z_,_M._~UD_.z. AND FLEX COLLAR'S. 1.00 ~/U STEEL ROTATING BHA glTH BIT #8. 3.00 RIH - FILL PIPE a 4333, & SHOE .50 BREAK CIRCULATION AND REAM BR.IDGES AT 8618' AND §809'. .50 TIH .50 REAM FROM 9276~ TO 9370/ 5.00 ROTARY DRLG FROM 9370' TO 9415' NOTE; GAINED 12 BBL ON IADC BIT GRADE BIT #7 - 6-8-LT~T-A-E-6-RG-TO NOTEz PLEASE REMEMBER TO SEND IN YOUR MAN HOURS ~O_,:..,)__~O LARRY LITTLE (S.UEPI SAFETY TECH~,._.~. 776-2518 - THANKS ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 24 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 875 LAST BOP TEST 9~/'9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 1240 @ 40 PP2 @ KILL SPEED 840 @ 20 TIME ~._H RS~. { CUM. ROT. HRS ~ ROTAT I NG I MUD MOTOR J TRIPPING 7.00 Ic&c 1.oo J REAMING 1.00 J SURVEYS J JET J REPAIRS J FISHING ,J NIP UP/DOUN /BOP/gl4 J TESTING BOP /UH J RUNNING CASING J CEMENTING J PICKUP/LAY DOUN DS 1.50 J INSPECT BHA J RIG UP/TEAR DOUN J UAIT ON UEATHER/MAT J EVALUATION J COR I NG I r~TUCOC' 150.25 13.50 RIG NAME PLATFORM ~Au FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UA" UELL A41A-11 UORK ORDER 739930 SWEPI ALASKA DAILY DRILLING REPORT PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 PRESENT DEPTH 8993 DIST. KB TO BHF 38.4 FOOTAGE DRILLED 185 NLTA LTH/YTD / SIZE OF LAST CSG 7.000 LTA LTH/YTD / DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 872 PAGE 1 OF 1 D A T E 98_Z_~_/9S_ DAY 21 EST. DAY -~ DAYS +/- SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: TRIPPING WATER DEPTH 80 /GALLOWAY DR SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 1.00 REAM TO BOTTOM 18.00 ROTARY DRILL FROM 8808t TO 8993t 1.00 CHECK FLOW AND PUMP DRY JOB. 3.00 POH UITH BHA. LAST BOP TEST g~L~/9~ LAST CSG TEST ~8/~/9~ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 70~-~ 2~ PP2 @ KILL SPEED 1050 @ 40 1.00 L/D BHA AND BEGAN PICKING UP BHA WITH BIT #6. PICKING UP BHA AT REPORT TIME. NOTE; RAISED MUD WT. TO 9.9 PPG IN HOPES TO PREVENT UPPER HOLE FROM SLOUGHING. IADC DULL BIT GRADE BIT ~5 - 8-8-CR-N-F-16/16:BC/BT/~ NOTE: TUBOSCOPE REP. ON PLATFORM TO INSPECT BHA AFTER JARRING OPERATIONS. INSPECTION FOUND (3) BAD BOXES AND 1 BAD PIN AS A RESULT OF GALLED DAMAGE. RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: ROTARY DRILLING SWEPI ALASKA DAILY DRELLING REPORT PROG. DEPTH 12170 ELEVAT. KB TO MSL PRESENT DEPTH 9148 DIST. KB TO BHF FOOTAGE DRILLED 155 NLTA LTH/YTD SIZE OF LAST CSG 7.000 LTA LTH/YTD DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA WATER DEPTH /GALLOWAY DR SUMMARY OF OPERATIONS (SflOg HOURS FOR EACH OPERATION) : 2.00 CONT. TO PiCK UP 3.5" HWDP TO COMPLETE BHA. CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C &C REAMING SURVEYS JET REPAIRS FISHING 105.75 18.00 3.00 1.00 1.00 1.00, NIP UP/DOWN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUR DS INSPECT BHA RIG UP/TEAR DOUR WAIT ON WEATHER/MAT EVALUATION CORING OTHERS 2.50 NIH WITH BHA. FILL DRILL PIPE AT 5000~ AND SHOE. 80 PAGE I OF 1 116.0 DATE 08/27/~ 38.4 DAY 22 / EST. DAY 45 ___/___ DAYS +/- 873 LAST BOP TEST ~8/~E/9~ LAST CSG TEST ~8_/_.~_~_~_~ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 860 @ 20 PP2 @ KILL SPEED 1340 @ 40 2.00 WASHED/REAMED FROM 8700' TO 8993~. FANNED BOTTOM TO CLEAN UP ANY DEBRIS LEFT FROM BIT #5. 17.50 ROTARY DRILL FROM 8993~ TO 9148~ J TINE (~RS2 J CUM. ROT. HRS J ROTATING J MUD MOTOR J TRIPPING 2.50 J C & c J REAMING 2.00 J SURVEYS J JET J REPAIRS J FISHING J NIP UP/DOWN /BOP/UH J TESTING BOP /UH J RUNNING CASING J CEMENTING J PICKUP/LAY DO~N DS 2.00 J INSPECT BflA J RIG UP/TEAR DOUR J WAIT ON WEATHER/MAT J EVALUATION .... I CORING 123.25 17.50 RIG NAME PLATFORM "A FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SUEPI ALASKA DAILY DRILLING REPORT PROG. DEPTH 12170 ELEVAT. KB TO MSL PRESENT DEPTH 8805 DIST. KB TO 8HF FOOTAGE DRILLED 84 NLTA LTH/YTD SIZE OF LAST CSG 7.000 LTA LTH/YTD DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA PACE 1 OF 1 116.0 DATE 38.4 DAY / EST. DAY / DAYS +/- 870 19 45 SIDE TRACK WATER DEPTH DRILLING FOREMAN: SELTZ R H /GALLOWAY DR PRESENT ACTIVITY: PULLING MUD UL~IALOG SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : .50 CIRC. THROUGH PiPE - PUMP DRY JOB 1.00 TOOH 80 LAST BOP TEST ~Li~L~ LAST CSG TEST ~8/~Z/_~~ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 420 @ 30 PPZ @ KILL SPEED 1460 ~ 50 2.00 BHA - L/D STEEL ASSEMBLY - P/U HIGH ~P~E[R Mg[g[:_M..__~R~ & MONELS 3.50 TIH - FILL PIPE ~ 4920' & SHOE 1.00 REAM FROM 8008' TO 8023' - GOT STUCK - WORK FREE - REAM TIGHT SPOT 8320' - SURVEY @ 8345' & 8637~ 6.50 DRLG. ~/MOTOR FROM 8721' TO 8805~ NOTE; ROTATE UP OFF BOTTOM TO CHANGE MUD PUMPS - GOT STUCK 3' OFF BOTTOM. 9.50 JAR DOVN & UP ON STUCK PIPE - MIX & PUMP UEIGHTED HIGH VIS PILL - MOBILIZE DIALOG & WEATHERFORD - RIM U/DIALOG TO RETRIEVE MWD - DIALOG LOST CIRCUT ON BOTTOM (NO COLLAR LOCATOR[ - TIGHT SPOT g 8616' - PULL OUT OF HOLE ~NO TOOL) - RIH - gORK THROUGH TIGHT SPOT @ 8621' - LATCH ON TOOL - PULL OUT OF HOLE ~ADDITIONAL 400 LBS[ IADC DULL BIT GRADING BIT #3 - 3-3-CT-G-E-1~16-ER-HRS TIME.__~2 ....... CUM. ROT. HRS 87.75 ROTATING 6.50 MUD MOTOR TRIPPING 4.50 C & C .50 REAMING 1.00 SURVEYS JET REPAIRS FISHING 9.50 NiP UP/DOWN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA 2.00 RIG UP/TEAR DO~N WAlT ON WEATHER/MAT EVALUATION CORING OTHERS SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41Aoll WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: REAMING OPEN HOLE TO BOTTOM PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~L~L~ PRESENT DEPTH 8808 DIST. KB TO BHF 38.4 DAY ZO FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST C-SG 7.000 LTA LTH/YTD _~/___ DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~ WATER DEPTH 80 LAST BOP TEST ~L~ LAST CSG TEST ~8/07/9~ /GALLOWAY DR BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED 420 @ 30 PP2 @ KILL SPEED 1460 @ 50 SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : .50 RDUL (DIA-LOG) 2.50 JAR ON STUCK PIPE - MAX PULL 390K. 1.50 PUMP HIG~ vise._(11.8#) SWEEP - 50 BBLS. INSPECTED DERRICK FOR LOOSE OBJECTS DURING SWEEP. 2.50 REDUCED PUMP SPM giTN SWEEP AT BIT AND CONTINUED JARRING OPERATIONS. JARRING DO~N ~ITH 75K - JARRING UP ~ITH 325K AND MAX PULL 390K. IMPLEMENTATION AND TECH AlT TEAM CONFERENCED TO DISCUSS SITUATION AND OPTIONS. DECISION WAS MUTUALLY MADE TO FREE PO~N.~T.L_~OOT OF~.AND SET CEMENT PLUG TO SIDETRACK. WHILE TEAM WAS MEETING FISH CAME FREE. POH WITH BNA TO SHOE. TIGHT SPOTS IN OPEN HOLE FROM 8808 TO 8060' 2.00 DROPPED BAR AND SHEARED PUMP OUT SUB. CIRC OUT HIGH VIS PILL. 2.00 POH ~ITX BHA. 1.00 L/O ENTIRE BHA FOR INSPECTION. 4.50 CONTACTED AOGCC WHO DECLINED WITNESS OF BOP TEST. PERFORMED SUCCESSFULL WEEKLY BOP TEST. 1.SO ~/U BIT #5 AND BHA. IAGO BIT GRADE BIT #4 4-4-CT-H-E-I-ER-HP 2.50 RIM WITH BHA. FILL PIPE AT 4950' AND CSG SHOE. 1.50 CUT AND SLIP 100~ OF DRILL LINE. SERVICE TOP DRIVE. 2.00 CONT TO RIM AND TAGGED UP AT 8323'. BROKE CIRCULATION AND UASH~E~ ..... REAMED FOR 8323~ TO 8798'. REAMING TO BOTTOM AT REPORT TIME. NOTE: THANKS TO ALL AIT TEAM MEMBERS FOR THIER TIME AND ASSISTANCE WITH THE RECENT HOLE PRORIrM~ T ! M E .(._HR_S~. CUM. ROT. HAS 87.75 ROTATING MUD MOTOR TRIPPING 4.50 C & C 3.50 REAMING 2.00 SURVEYS JET REPAIRS 1.50 FISHING 5.00 NIP UP/DOUN /BOP/WH TESTING BOP /UH 4.50 RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA 2.50 RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A# FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41A-11 WORK ORDER 7399:50 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: ROTARY DRLG. PROG. DEPTH 12170 PRESENT DEPTH 8547 FOOTAGE DRILLED 276 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 / SUMMARY OF OPERATIONS (SNOU HOURS FOR EACH OPERATION) : 1.00 CUT & SLIP DRLG. LINE .50 TIH - TAG a 8140~ .50 REAM TO BOTTOM 22.00 ROTARY DRILL FROM 8271~ TO 8547~ ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY NLTA LTH/YTD / EST. DAY LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 868 ..... LAST BOP TEST 98.~.!~/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HAS) PP1 @ KILL SPEED 720 @ 30 PP2 @ KILL SPEED 1400 @ 50 NOTE; AT 8289~ p/~ OFF BOTTOM TO WIPE HOLE - KICKED OUT TOP DRIV._~E~__ DUE TO TORQUE - GOT STUCK - JARS WENT OFF TWICE GOING UP ~UNINTENTIONAL) - JARED DOWN TWICE - CAME FREE - NO MORE PROBLEMS AFTER. NOTEi___~/U & UIPE HOLE EVERY 1-2 HRS. NOTE; NEXT BIT RUN WILL P/~ HIGH SPEED MOTOR ~ATTEMPT TO INCREASE P RATE) T I M E ~.HR~S). ..... CUM. ROT. HRS ROTATING 22.00 MUD MOTOR TRIPPING .50 Ic&c REAMING .50 SURVEYS JET REPAIRS I FIS. lUG NIP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DO~N DS INSPECT BHA RIG UP/TEAR DOUN UAIT ON UEATHER/MAT EVALUATION I CORING OTHERS 1.00 64.7~ SUEPI ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "'A" ~ELL A41A-11 UORK ORDER 739930 SIDE TRAC~ DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: TRIPPING PROG. DEPTH 12170 PRESENT DEPTH 8721 FOOTAGE DRILLED 174 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 /GALLOWAY DR SUMMARY OF OPERATIONS (SHO~ HOURS FOR EACH OPERATION) : 16.50 ROTARY DRLG. FROM 854~~ TO 8721~ :5.50 CHECK FLOW - TOOH ~NO BAD SPOTS IN OPEN HOLE2 :5.50 ~/U 108 JTS :5 1/2" DP .50 CIRC. THROUGH DP ~PRIOR TO RUNNING MgD~ ELEVAT. KB TO MSL 116.0 DATE ~8_~_~/9~ DIST. KB TO BHF 38.4 DAY 18 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 869 lAST BOP TEST ~8_L~/9~ LAST CSG TEST BHA INSPECTION (CUM. ROT HAS) PP1 a KILL SPEED 610 · 30 PP2 @ KILL SPEED 950 T i M CUM. ROT. HAS ROTAT I NG MUD MOTOR TRIPPING :5.50 c&c .5o REAMING I SURVEYS JET ____ REPAIRS FISHING NIP UP/DO~/N /BOP/UH TEST l NG BOP /VH Ru..I.G CASI.G J CEMENTING ____ PICKUP/LAY DOUN DS :5.50 INSPECT BHA RIG UP/TEAR DOUN ~AIT ON IJEATHER/MAT EVALUATION I CORING _- 81.25 16.50 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF I RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORN "A" WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: MOTOR DRLG. PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~8[~O_g_L~ PRESENT DEPTH 8087 DIST. KB TO BHF 38.4 DAY 15 FOOTAGE DRILLED 282 NLTA LTH/YTD ___/___ EST. DAY 45 SIZE OF LAST CSG 7~000 LTA LTH/YTD / DAYS +/- +4.0 DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~66 WATER DEPTH 80 LAST BOP TEST ~8/~/9~ LAST CSG TEST ~8/~_/_~ / BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED __~ @ 112 PP2 @ KILL SPEED _ 5__~0 @ 1._~_6~ SUMMARY OF OPERATIONS (SHOg HOURS FOR EACH. OPERATION) : 24.00 ~OT~RY/O~IENT/MOTOR DRILL FROM 7805' TO 8087~ NOTE; TOTAL CIRC./DRILL HRS. ON BIT #2 : 27.5 J TIME (HRS) J CUM. ROT. HRS J ROTATING J MUO MOTOR J TRIPPING Ic&c I REAMING I SURVEYS J JET I REPAIRS J FISHING J NiP UP/DOWN /BOP/WH J TESTING BOP /WH J RUNNING CASING J CEMENTING J PICKUP/LAY DOWN DS J INSPECT BHA J RIG UP/TEAR DOWN J WAIT ON ~EATHER/MAT J EVALUATION J CORING J OTHERS 29.50 11.50 10.00 1.00 1.50 SWEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" PROG. DEPTH 12170 FIELD MIDDLE GROUND SHOAL PRESENT DEPTH 8271 LEASE PLATFORM aA" FOOTAGE DRILLED 184 UELL A41A-11 SIZE OF LAST CSG 7.000 UORK ORDER 739930 DEP. OF LAST CSG 7765 SIDE TRACK WATER DEPTH 80 DRILLING FOREMAN: SELTZ R H / PRESENT ACTIVITY: SLIPPING DRLG. LINE SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 16 NLTA LTH/YTD / EST. DAY LTA LTH/YTD _~/___ DAYS +/- DAYS SINCE LAST LTA 867 LAST BOP TEST ~8/!~ LAST CSG TEST gB/gZ/9 BNA INSPECTION (CUM. ROT HRS) PP1 ~ KILL SPEED PP2 @ KILL SPEED 1500 ~ 50 15.00 ~OTARy/ORIE~T/MOTOR, DRLG. FROM 8087~ TO 8272~ .50 CHECK FLOW - PULL TO SHOE ~SLIGHT OVERPULL - DRAGGING COALS~ 4.00 PUMP PILL - DROP DART/SHEAR P/O SUB - TOOH 2.00 BHA ° LJD MOTOR & STABS o STAND BACK MONELS - M/U STEEL ROTARY ASSEMBY 2.50 TIH ° FI-LL PiPE g 5000' & SHOE TOTAL CIRCr/DRILL HRS. BIT #2 = 42 IADC DULL GRADE BIT #2 - 3-3-ER-A-E-I-UT-HRS NOTE~ ANADRILL DAY/COST CURVE INFO. NOT UPDATED - JEFF TO GET THEM UPDATED ~Y~COST NUMBERS TODAY (WE ARE DOING BETTER THAN IT APPEARS~. T ! ~E.~_.~ H R S~.,__ CUM. ROT. HRS ~2.75 ROTATING 7.75 MUD MOTOR 5.50 TRIPPING 7.00 C & C REAMING .75 SURVEYS 1.00 JET REPAIRS FISHING NIP UP/DOIJN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICtC, UP/LAY DOWN DS 2.00 INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS SUEPI ALASKA DAILY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM "'A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R fl PRESENT ACTIVITY: ~LU BflA PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE gB_L.!_8_/9 PRESENT DEPTH 7721 DIST. KB TO BHF 38.4 DAY FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY ._~ SIZE OF LAST CSG 7.00~ LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LtA UATER DEPTH 80 LAST BOP TEST ~8/!6/~_~ LAST CSG TEST ~8/g~/9~ / BflR INSPECTION (CUM. ROT HRS) PP1 g KILL SPEED 30 a 300 PP2 @ KILL SPEED 50 ~ 57--5 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : .5____~.0 aHA - M~U SPEAR ASSEMBLY 2.00 Tiff TO 7268' 1.50 CIRC BOTTOMS UP (LOU RATE THROUGH SMALL I.D.~ .50 SPEAR FISH 4.00 TOOH (SLOU - DRAGGING) 1.00 L/D FISH - BAKER DB PKRz SEAL BORE EAT, XO, XO~ (1} JT 2 3/8#.TBG, ~TIS "X" NIPPLE, (1) JT 2 3/8~ TBG, MECH. TBG RELEASE, 2 3/8# TBG sUB~ 89.20~ 1.00 BHA :~M/U 5 7/8,.OVERSHOT 3.00 TIH TO Z345~ .50 CIRC BOTTOMS UP (MAX GAS AT PITCHER NIPPLE - 80% LEL) 1.00 UORK OVER GUNS g T~64~ - JAR ON FISH 3.50 TO0~ U/FISH 1.00 BHA - L/D JARS,_BS, & O/S 4.00 HOLD PRE-JOB SAFETY MEETING - L/D SPENT GUNS NOTE; GUNS HAD TRAPPED PRESSURE - SLOU BLEEDING PRESSURE & LAYING DOUN. HALLIBURTON SUPERVISOR RELEASED PRESSURE & ASSISTED IN LAYING DOUN GUNS. .50 BHA o M/U 6" BIT, JUNK BSKTS, &.JARS NOTE; CLEANING PITS & PREPARING MIN. OIL MUD UHILE TRIPPING. FISH #2 - PORTED PRESSURE EQ. SUB, (1) .JT 2 3/8" TBG~..FIREING HEAD EXT, FIRING HEAD, 307~ GUNS, STEEL BALL PLUG = ~74~ TIME ~HRS) CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING 12.50 c & c z.oo REAMING SURVEYS JET REPAIRS FISHING 1.50 NIP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING ------ CEMENTING PICKUP/LAY DOUN DS -8.0..___~ INSPECT BHA RIG UP/TEAR UAIT ON UEATHER/MRT _____ EVALUATION ____._ CORING .... OTHERS SUEPI ALASKA DAILY DRILLING REPORT PAGE I OF I RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 ~ORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: MOTOR DRILLING PROG. DEPTH 12170 PRESENT DEPTH 7805 FOOTAGE DRILLED 40 SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 / ELEVAT. KB TO MSL 116.0 DATE ~/19/95 DIST. K8 TO BHF 38.4 DAY NLTA LTH/YTD ~/~ EST. DAY 4-5 LTA LTH/YTD __/__ DAYS +/- +4.0 DAYS SINCE LAST LTA 865 LAST BOP TEST ~8~16/95 LAST CSG TEST 08/0~/9~ BHA INSPECTION (CUM. ROT HAS) PP1 a KILL SPEED _ PP2 g KILL SPEED 50 SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 1.00 8HA - M/U RR BIT..~:_(5)._JU~_~8~KTS, UP JARS, (6) DC'~, & PO SUB ...... .50 DRAIN STACK & STAB BIT THROUGH UEAR BUSHING ~6" HOLE THROUGH 13 5/8" RISER. 30' AUAY) 3.00 TIH - FILL PIPE @ 4980~ & 7644~ .50 TAG FILL g 7687' - DRILL TO 7721~ 4.00 DRILL FLOAT, CMT, & SHOE ....... .50 FLUSH STAND PIPE & MUD LINE U/MIN. OIL MUD 1.00 DRLG. FROM ~765~ TO 7774~ 1.00 LEAK OFF TEST - PERFS TAKING FLUID - APPROX. 10.5 PPG EQUIV. 1.50 CIRC. & CONDITION MUD - MIX DRY JOB - FILL TRIP TANK 2.00 TOOH FOR MOTOR 3.00 BHA - L/D BIT &* JUNK BSKTS - P_/U MOTOR ASSEMBLY 2.50 TIH - FILL PiPE & CHECK MUD @ 4547' .50 REAM SHOE & UORK BOTTOM FOR JUNK 3.00 ROTARY, :ORIE~[~_&__?OTOR DRLG FROM 7?74' TO 7805' NOTE; REC. APPROX. 4 GAL OF METAL DEBRIS FROM JUNK BSKTS. TIME (firs) J CUM. ROT. HRS ROTATING _6-00 HUD MOTOR 2.0.____~0 TRIPPING _7.5~ c & c ~.s__go REAMING 1.0._____0 SURVEYS JET REPAIRS FISHING _~ . NiP UP/DOUN /BOP/UH TESTING BOP /UH _____ RUNNING CASING CEMENTING _~- PICKUP/LAY DOUN DS .~._~0~ INSPECT BHA RIG UP/TEAR DOUN _____ ~AIT ON UEATHER/MAT EVALUATION ------- CORING .... OTHERS £PI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ R H PRESENT ACTIVITY: LAYING DOgN TBG PROG. DEPTH 12170 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 OEP. OF LAST CSG 7765 UATER DEPTH 80 / ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY _~1~ NLTA LTH/YTD / EST. DAY .~ LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA ~6...~2 LAST BOP TEST ~8/~/~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED @ SUMMARY OF OPERATIONS (SHOU HOURS FOR EACH OPERATION) : 1.00 PULL PKR LOOSE UITH tTO~.~OOO_~PKR. ORAGGING) 1.00 ~/U TO CIRC. UELL ~NC)TE;__TBG ~AS NOT LINED UP IN B~PS_~MASHED LANDING JT. ON LONG STRING UHEN BOPS CLOSED) 4.00 CIRC. LONG AND SHORT STRINGS 4.00 HOLD PRE-JOB SAFETY NEETING_(HAZARDS LAYING DOgN DUAL STRING~__: PULL PKR UP HOLE 38~(DRAGGING 150,000) - PKR STUCK - CONSULT UITH HOUSTON ENGINEERING TO DETERMINE MAX. PULL ON DUAL STRING UITX MASHED JT. - PULL 200.000 TO=GET TBG HANGER ABOVE SLIP AREA - SET SLIPS -_L/D MASH- ED JT AND PULL BOTH BPV~S - PULL 205,000 AND PKR CAME FREE(gRAGGING~_ 14.00 LDL~_TBG. & MISC. TOOLS MAX. BOTTOMS UP GAS - 42% LEL _NO.__T.T~[ DIALOG ~IRELINE OPERATOR ON LOCATION IN CASE PKR STICKS. TIME ~H_RS2_ CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C 4.00 REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/UH .... TESTING BOP /~JH RUNNING CASING CEMENTING PICKUP/LAY DOUN DS 14.00 INSPECT BHA RIG UP/TEAR DOWN UAIT ON UEATHER/MAT EVALUATION CORING - OTHERS 6.00 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A# UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: SELTZ Rfl PRESENT ACTIVITY: ~/U BHA SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 PROG. DEPTH 12170 ELEVAT. KB TO M'SL 116.0 DATE ~8_~/~ PRESENT DEPTH 7279 DIST. KB TO BHF ]8.& DAY 12 FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY SIZE OF LAST CSG 7.000 LTA LTH/YTD _~/_~ DAYS +/- OEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 863 UATER DEPTH 80 LAST BOP TEST ~8/~/~ LAST CSG TEST ~8_~/~ / BNA INSPECTION (CUM. ROT HRS.) PP1 @ KILL SPEED 30 @ 47'~ PP2 @ KILL SPEED 50 @ 900 SUMMARY OF OPERATIONS (SHO~ HOURS FOR EACH OPERATION) : 7.00 ~/O 2 3~8a TBG & MISC. TOOLS - NOTE~ FOUND HOLE IN COLLAR ON SHORT STRING. BOTTOM JT. ON SHORT STRING UAS LOOSE IN PKR. (HAND TIGHT) ___ 1.00 ORGANIZE RIG FLOOR - CHANGE RAMS TO 3.5# 2.00 TEST RAMS (~IPE & BLIND).iTO ~/5000 PSi - TEST HYDRIL TO 250/3500 PSi PULL TEST PLUG. G_/INSTALL UEAR BUSHING. 1.00 ~/U ~HA £PKR. MILLING ASSEMBLY2 3.00 TIH TO 6409~ .50 MILL ON PKR. @ 6436' 1.00 SHUT UELL IN & CIRC. OUT G~S.~.....(5~X LEL) 3.00 MILL ON PKR. TO 6438' - PKR. UENT DOUN HOLE .50 PUSH PKR TO 7279' 1.00 CIRC. BOTTOMS UP 1.00 REVERSE CIRC. ON TOP OF PKR. ~TUO VOLUMES - DID NOT GET ALOT OF DEBRIS FROM REVERSING~ 2.00 POOH 1.00 L/o MILL & BOOT BSKTS. - P/U SPEAR _N~OT_[;___L/O_~I) JT 3.5" DRILL PiPE ~/ UASHED PIN END. ALL JUNK BSKTS HAD METAL INSIDE - GOOD RECOVERY GREAT JOB DONE BY ALASKA CASING & INLET DRILLIN~ LAYING DOUN DUAL STRINGI NO INJURIES - NOTHING BROKE T I liE CUM. ROT. HRS ROTAT I NG MUD MOTOR TRIPPING 5.50 i c&c 3.00 REAMING SURVEYS JET REPAIRS FISHING 3.50 NIP UP/DOUN /BOP/UN TESTING BOP /UX 2.00 RUNNING CASING CEMENTING PICKUP/LAY DOUN DS 9.00 INSPECT BHA RIG UP/TEAR DOWN UAIT ON UEATHER/MAT EVALUAT I ON CORING ~_ OTHERS 1.00 S~EP! ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM WELL A41A-11 WORK ORDER 739930 SIDETRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: LOADING WELL W/8.5 PPG SEAWATER PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH 7765 DIST. KB TO BHF 38.4 DAY 9 FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY _~ SIZE OF LAST CSG Z:O00 LTA LTH/YTD / DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 860 WATER DEPTH 80 LAST BOP TEST LAST CSG TEST / BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 3.50 FINISHED RIGGING UP. PROD SAFETY AIR WORKING ON RIG FLOOR. 5.00 ~/U SW,__.._~S:_H~E~D_._.~S~F£TY/PROCEDURES_H~E?TNG~ H/U TBG PUNCH ~/Z SHOTS. RIH ~/.~.UHCH_.~_.(.LON___.~G~S~IIW~ AND SHOOT Hg~S A~:6394',_TBG PS~ DROPPED 200~. ~O~~~DO~ S~S. 3.0~ MONITOR LONG STRING~U~[,_~~/~50 TO 430 PSi IN .5 HRS. REPAIR HATCH COVER THAT gAS CUT UP ON PREVIOUS YELL gORK. RIG UP SLICKLINE. 9.50 TEST LUBRICATOR. RIH W/KICKOVER TOOL T/PULL #5 VALVE FROM LONG STRING AT 5992~. NO SUCESS. CH~' TOOL TYPE, RIH, LATCH ONTO VALVE, POH. NIH AND SET #XEL# DUMMY AT 283~. POH. R/D FROM LONG STRINg,_R[~_~P ON SHORT STRING. TEST LUBRICATOR. RIH AND RETRIEVE BALL VALVE FROM 318~. ~/U_CHOKE RETRIEVING TOOC.::RIH AND :RETRIEVE OTIS CHOKE REGULATOR FROM 6049~. M/U, RIH AND SET #XEL# DUMMY VALVE AT 318~. R/D SLICKLINE. 1.00 REMOVE FISHER REGULATOR VALVE ASSMY FROM SHORT ST~I~ SIDE INSTALLED HARD LINE F/SHORT STRING TO PROD HEADER. BLED OFF ANULUS T/PROD HEADER 2.00 PUMP 8.5 SEAUATER DOWN LONG STRING TAKING RETURNS OUT SHORT STRING UNTIL HAD CLEAN RETURNS. PUMP 8.5 SEAWATER DOWN LONG STRING UNTIL HAD CLEAN RETURNS OUT ANULUS. I. TIM~_~URSJ J CUM. ROT. HRS J ROTATING J MUD MOTOR I TRIPPING I c&c 2.00 J REAMING I SURVEYS I JET J REPAIRS 3.00 J FISHING J NIP UP/DOUN /BOP/WH J TESTING BOP J RUNNING CASING J CEMENTING J PICKUP/LAY DOWN DS J INSPECT BHA J RIG UP/TEAR DOWN 3.50 J WAIT ON WEATHER/MAT J EVALUATION J CORING J OTHERS 15.50 SUEPI ALASKA DALLY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 WORK ORDER Z39930 SIDE TRACK DRILLIHG FOREMAN: WELLS R V PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE gB_L!~L~~ PRESENT DEPTH 7765 DIST. KB TO BHF 38.4 DAY 10 FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.00~ LTA LTH/YTD / DAYS */- ~- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 861 UATER DEPTH 80 LAST BOP TEST 98/~/~ LAST CSG TEST. ~8_~/~ / BHA INSPECTION (CUM. ROT HAS) PRESENT ACTIVITY: PULLING ON PACKER W/DUAL STRINGS PPI @ KILL SPEED PP2 @ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 6.00 SHUT IN WELL AND MON[Tg~RECORO BOTH TBG PRESSURES AND ANULUS PRESSURE UHILE MIXING KILL WEIGHT FLUID USING STOCK SALT TO 9.4 PPG. KILL WELL. ClRC DOWN LONG STRING TAKING RETURNS OUT ANULUS UNTIL HAD 9.4 PPG. PUMP DO~N LONG STRING TAKING RETURNS OUT SHORT STRING UNTIL HAD 9.4#. CHECK F/EL~O~: NONE. 13.50 INSTALLED BPV IN EACH STRING N/D T~L~/u BOPE.-- 4.00 TEST BOPE,.RAMS ONLY. WILL TEST BLINDS AND ANULAR PREVENTOR UHEN OUT OF THE HOLE UITH THE DUAL STRING. .5~ 8ACK OUT LOCK DOWN SCREWS ON TBG HANGERS, PULLING ON PACKER AT RPT TIME. ....... CUM. ROT. HRS ROTATING MUD MOTOR TRIPPIHG Ic&c 6.00 REAMING SURVEYS JET REPAIRS FISHING NiP UP/DOWN /BOP/WH 13.50 TESTING BOP /WH ~.00 RUNNING CASING CEMENTING PiCKUP/LAY DO~N DS INSPECT BHA RIG UP/TEAR DOUN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS __=~ SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 UORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: UELLS R V PROG. DEPTH 12170 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 / PRESENT ACTIVITY: CONTINUE UITH RIG UP ELEVAT. KB TO MSL 116.0 DATE ~8/~/9~ DIST. KB TO BHF 38.4 DAY 7 NLTA LTH/YTD ___/___ EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 858 LAST BOP TEST LAST CSG TEST ~9~/9~ BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED @ PP2 @ KILL SPEED @ SUMMARY OF OPERATIONS (SHOg HOURS FOR EACH OPERATION) : 24.00 HANG 10# FLOg LINE TO HEADER MANIFOLD. FAB AND INSTALLING 6" CHOKE AND 6" VATER RETURN LINES. HANG ESCAPE LADDER ON VEST SIDE OF DOG HOUSE. RESET BEAVER SLIDE. PREP TO LEVEL DERRICK; LOOSEN CLAMPS ON STAND PIPE AND CEMENTING STAND PIPE. DISCONNECT VENT LINE ON GAS BUSTER AND STEAM LINES. LOOSEN DERRICK LEG BO~TS~_~_RE~OVE SHIMS FROM VEST SIDE OF DERRICK AND INSTALL ON THE EAST SIDE. SHIM OUT NEAT~S,_~GAS_~STER. RECLAMP STAND PIPES, gREASE AND TIGHTEN DERRICK LEG BOLTS. INSTALL 6" AUGER IN PiTS NALLVAY. (AUGER HAS BEEN TOTALY REBUILT) PO@ER CHECK DVKS, PUMPS, ROTARY TABLE, TOP DRIVE~,AIR SYSTEMS. aaa CIRCUT FAIL_~E~_ TROUBLE SNOOTING FOUNO A BAD CONNECTION IN CONTROL CABLE VIRES. TOP DRIVE CONTACTOR COIL IS FRIED, MUST FIND REPLACEMENT. REBUILT TRASH PUMPS. CHECK OUT SUCTION VALVES AND RISERS IN PITS. FAB 6# EXTENSION FROM RIG TO PIPE RACK. VELD AND HANG 4# CHOKE LINE. LEVEL CATVALK. BEGIN PLUMING IN SLOPS TANK FROM VHR-2 TO PITS. REPAIRED "A# CIRCUT CONTROL CABLE END CONNECTOR. CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NiP UP/DOUN /BOP/UH TESTING BOP /VX RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BNA RIG UP/TEAR DOUX gAIT ON VEATHER/MAT EVALUATION CORING OTHERS 24.00 SgEPI ALASKA DALLY DRILLING REPORT PAGE I OF 1 RIG NAME PLATFORM aA" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM #A# VELL A41A-11 VORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: VELLS R V PRESENT ACTIVITY: FINISHING RIG UP PROG. DEPTH PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 UATER DEPTH 80 / 12170 ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY 8 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 859 LAST BOP TEST LAST CSG TEST ~Lg~/-~ BNA INSPECTION (CUM. ROT HAS) PP1 a KILL SPEED PP2 @ KILL SPEED @ SUMMARY OF OPERATIONS (SXOg HOURS FOR EACH OPERATION) : 24.00 ORDERE~_RECEIVE~D AND INSTALLED TOPDRIVE RELAY FOR CONTROL CIRCUT. IT HELPED TO THE EXTENT THAT IT IDENTIFIED A PROBLEM VITH THE #PLC# AND OR PROM CARD. VE gILL CONTACT #TECH PO@ER" CONTROLS COMPANY TOD__~A~z .... BUILDERS OF THE SYSTEM FOR HELP/PARTS AS NEEDED. PULLED CONTROL CABLE FOR SLOPS TAN~ TO NCC PANEL FROM VHR-2. FINISHED PLUMBING IN SLOPS TANK. VATER SYSTEM CHARGED AND LEAK TESTED. PUT KATO GEM SET ONLINE. FINISNED EXTENSION ON 6" AUGER SYSTEM. SILICONE HATCH COVERS. CLEAN PIT~i ~ISPOSE O.__F FLUIDS. FILL PiTS UITH RAg SEAUATER. ~PITS 3 & 4) SQUARING RIG AUAY FOR OPERATIONS. SPOT SCHLUMBERGER UNIT ON CATUALK. TIME oIHRS~ CUM. ROT. HAS ROTATING MUD MOTOR TRIPPING C & C REAM I NG SURVEYS JET REPAIRS FISHING NIP UP/DOUN /BOP/UH TESTING BOP /UH RUNNING CASING CEMENTING PICKUP/LAY DOUN DS INSPECT BHA RIG UP/TEAR DOUR gAIT ON UEATHER/MAT EVALUATION CORING OTHERS 24.00 ALASKA DALLY DRILLING REPORT PAGE 1 OF gig NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UELL A41A-11 ~ORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: I/ELLS R V PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE PRESENT DEPTH DIST. KB TO BHF 38.4 DAY 5 FOOTAGE DRILLED NLTA LTH/YTD / EST. DAY 45 SIZE OF LAST CSG 7.000 LTA LTH/YTD / DAYS +/- . DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA 856 L/ATER DEPTH 80 LAST BOP TEST LAST CSG TEST / BflA INSPECTION ~CUM. ROT HRS) PRESENT ACTIVITY: I/IRELINE I/ORK I/HILE RIGGING UP PP1 @ KILL SPEED PP2 @ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 CUT LOOSE AND REMOVE CENTER SKID BEAM. SET IN WELDING SHOP BUILDING. SET IN LITE WATER T~N__~.K __FILTER SKID AND TOOL LOCKERS ETC. SET IN MUD LINE. PUT UP AND .WELD IN CAT WALK TO IRON RACK. MAKE UP LITE WATER LINES. SET IN PUMP ROOM BUILDING. SET UP JACKS ON PONY SUB TO PULL RIG NORTH. RIG DOWN HELIPORT SERVICES. CLEAR EAST DECK. BUILD SCAFFOLDING AND REMOVE EXUAST FA~~P WALL TO ACCOMADATE RIG MOVE UP NEXT TO CAMP. CLEARED MUD PALLETS F/EAST MUD DOCK. SKID HELIPORT EAST~ RIG U~_ SERVICE LINES. MOVED HOWCO PUMP AND HOUSE. SET STAIRS T/SUB. SKID RIG ABOVE PONY SUB NORTH. M/U STORM ~LA~PS._.___.~R[U AIR ~/RIG. SKID RIG TOWARD CAMP. (ON LOCATION M~_.~.~. LOWER STORM CLAMPS. RIGGING UP ELECTRICAL CABLES. SET IN BEAVER SLIDE. SET CAT WALK EXTENSION AND BOLT UP BEAVER SLIDE. SET DRLG LINE SPOOL ON DECK. PULL IN AC POWER CABLES AND WIRE IN. REPAIR HANDRAILS ON BEAVER SLIDE. ~/U SLICKLINE (TOM REESE~ PULL ~RON___.~G/PL..~UO F~LONG STRING. WIRELINER CONTINUING AT RPT TIME TO PULL GAS LIFT VALVE FROM LONG STRING BETWEEN PACKERS. THEN WILL PULL SSSV FROM SHORT STRING AND RUN DUMMY~S IN BOTH STRINGS. ~NO SSSV IN LS~ .... ALL "ALT" MEMBERS: INVOICE FOR HS&E BONUS FOR A34-11LS...THE BONUS WE LOVE TO PAYlll GREAT JOB AND KUDO'S TO ALLI! LETS DO IT AGAINI*I*! CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C& C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/VH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOI/N DS INSPECT BHA RIG UP/TEAR DOI/N WAIT ON WEATHER/MAT EVALUATION CORING OTHERS SL/EPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM HA" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM UA" L/ELL A41A-11 I/ORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: CONTINUE RIGGING UP PROG. DEPTH 12170 ELEVAT. KB TO MSL 116.0 DATE ~8_~!/~~ PRESENT DEPTH DIST. KB TO BHF 38.4 DAY _ FOOTAGE DRILLED NLTA LTH/YTD ___/___ EST. DAY SIZE OF LAST CSG 7.000 LTA LTH/YTD ___/___ DAYS +/- DEP. OF LAST CSG 7765 DAYS SINCE LAST LTA ~57 L/ATER DEPTH 80 LAST BOP TEST LAST CSG TEST ~8_L~/_~ / BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED @ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 WIRELINER UNABLE TO LATCH ONTO GAS LIFT VALVE BETL/EEN THE PACKER. ~ET UP HOWCO UNIT. ~SE AND P-TANK WHERE IT GOES.PULLED MORE ELECT. WIRE AND TERMINATE. UNSTACK PARTS/CHANGE HOUSES AND SPOT ON FINAL RESTING PLACES. RIG DOWN POWER PACK AND RIG JACKS AND STORE. PREP DECK FOR BOAT LOAD OF EQUIPMENT COMMING OUT. CUT LOOSE AND REMOVE WEST SIDE SKID RAIL. S~AP BUFFALO FAN AND LOUVERS IN PUMP ROOM. INSTALLED 2" WATER LINE TO RIG. RE-ROUTE AND CONNECT REMOTE KOOMY CONTROL CABLE. ROUTE AND PLUMB IN KATO GEM FUEL LINE. INSTALL LID ON SLOP TANK. WELD DOWN MUD LINE CLAMPS/SUPPORTS. FAB/INSTALL DUCT BOXES AND 10" HOSE FOR CAMP EXUAST FAN. TIE UP WIRES ONSIDE OF RIG. MOVE SOUTH SIDE PIPE RACK REMOVE BEAVER SLIDE AND HANG FLOWLINE HEADER. INSTALL WALKWAY TO PARTS HOUSE FROM KATO ROOF. TIE IN ELECTRICAL LINES IN PUMP ROOM. NOTE: NAD 2 TO 3 GAL DIESEL SPILL TO THE WATER. ALL AUTHORITIES ~ERE NOTIFIED AND PAPER ~ORK TRANSMITTED. MEASURES HAVE BEEN TAKEN TO PREVENT RECURRENCE OF LIKE INCIDENT. T [ CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOI/X /BOP/UH TESTING BOP /l/H RUNNING CASING CEMENT I NG PICKUP/LAY DOIJN DS INSPECT BHA RIG UP/TEAR DOI/N UAIT ON l/EATHER/MAT EVALUATION CORING J~EPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PRESENT ACTIVITY: MOVING RIG ELEVAT. KB TO MSL 116.0 DATE ~Z~/9~ DIST. KB TO BHF 38.4 DAY 3 NLTA LTH/YTD ____/____ EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 854 LAST BOP TEST LAST CSG TEST ~Z/9~ PROG. DEPTH 12170 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACN OPERATION) : 24.00 FINISHED SKIDDING RIG WEST. CLEANED UP O.B. MUD. REMOVED ESCAPE LADDER REMOVED HELIPORT BRACES F/WEST SIDE OF C~MP~_IN~TALLED PAD EYES ON THE BRACES. REINSTALLED BRACES ON EAST SIDE OF CAMP. REMOVED FLOW LINES FROM RIG TO PUMP ROOM AREA. REMOVED WIND BLOCK BETWEEN CAMP AND PUMP ROOM. MADE UP FLANGES ON FIRE WATER PUMP AND PIT SUCTION LINE. CLEAN UP WELDS ON SKID BEAMS. PREP DRAIN SYSTEM ON LEG 2 FOR RIG OPERATIONS. SPOT RIG IN PLACE TO TURN IT AROUND. PREP CAMP FOR MOVE AND MOVE CAMP. WELDER REBUILT 6" AUGER SYSTEM. PREP SLOPS TANK FOR MOVING ~/WHR-2. T I M E CUM. ROT. HAS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS RIG UP .~/SHIP LITE WATER T/PIT #8. WELD DOWN SKID BEAM OVER UHR-2. INSTALLED WIND BLOCK BACK ON CAMP ~/PUMP ROOM. REMOVED SLOPS TANK ~L~iiR-2z PREP TLIN~TALL IN WHR-2. CONTINUING RIG MOVE AT APT TIME. SUEPI ALASKA DAILY DRILLING REPORT PAGE 1 OF 1 RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WEll A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V / PRESENT ACTIVITY: MOVING RIG ONTO NEW LOCATION ELEVAT. KB TO MSL __.1_.1~.0 DATE ~8/~/9~ DIST. KB TO BHF 38.4 DAY 4 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 855 LAST BOP TEST LAST CSG TEST ~8_/_~/9~ PROG. DEPTH 12170 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 PUMPED LITE WATER INTO PIT #8. SET SLOPS TANK INTO WHR-2. RIG UP JACKS IN SUBBASE TO TURN RIG 180 DEGAS. REMOVED STARIS F/EAST SIDE OF CAMP AND SECURE DOORS. PULLED PUMP HOUSE. PULLED LITE WATER TANK. FILTER SKID AND ALL OTHER MISC EQUIP FROM AREA. PULLED WELDING SHOP BUILDING. REMOVED GUIDE BLOCKS FROMSU~BA_._~SE.~_~TURN FEE~_ON_.~_JACKS. PUSHED RIG TO END OF SUBBASE. CUT OFF ESCAPE LADDER ON BACK OF RIG. R/U JACKS/POWER T I M E (It_RS_). CUM. ROT. HRS ROTAT I NG MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENT I NG PICXUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS PACK ON MOON POOL. RIG UPPER STROH CLAMPS. TURNED RIG 90 DEG'S. gELD DOWN TRACFS.c_F._J.IIIISHED TURNING RIG 90 MORE DEG'S. REMOVED JACKS F/SUB. INSTALLED JACKS ON RIG [ZPLJL[:[LLEG 2. PULLED/PUSHED RIG T/LEG 2. CNG ~ACKS AND PUSHED EAST [Z~LEAR CENTER RAILS. GETTING ON LOCATION AT REPORT TIME. ~EPI ALASKA DAILY DRILLING REPORT RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: WELLS R V PROG. DEPTH 12170 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 WATER DEPTH 80 /GALLOWAY DR PRESENT ACTIVITY: PERFORMING RIG MOVE PAGE 1 OF 1 ELEVAT. KB TO MSL 116.0 DATE ~Z~/9~ DIST. KB TO BHF 38.4 DAY 1 NLTA LTH/YTD / EST. DAY 45 LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA 852 LAST BOP TEST ~L~ LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED @ PP2 @ KILL SPEED @ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 6.00 CLEARED PIPE RACK AND CUTTING OFF MARKER SUPPORTS FOR KATO. PERFORMING T i ME_~URSl CUM. ROT. HRS ROTATING MUD MOTOR TRIPPING C & C REAMING SURVEYS JET REPAIRS FISHING NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING PICKUP/LAY DOWN DS INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT EVALUATION CORING OTHERS OTHER ~9~_~TIES_~._AND STEPS IN THE MOVING OF THE RIG OVER LEG #2 AND RIGGING UP ON A41A-11LN. 6.00 SWEPI ALASKA DAILY DRILLING REPORT RIG NAME PLATFORM "A" FIELD MIDDLE GROUND SHOAL LEASE PLATFORM "A" WELL A41A-11 WORK ORDER 739930 SIDE TRACK DRILLING FOREMAN: ~ELLS R V PROG. DEPTH 12170 PRESENT DEPTH FOOTAGE DRILLED SIZE OF LAST CSG 7.000 DEP. OF LAST CSG 7765 ~ATER DEPTH 80 /GALLOWAY DR PRESENT ACTIVITY: PERFORMING RIG MOVE PAGE 1 OF 1 ELEVAT. KB TO MSL 116.0 DATE DIST. KB TO BHF 38.4 DAY NLTA LTH/YTD / EST. DAY .._~4~ LTA LTH/YTD / DAYS +/- DAYS SINCE LAST LTA LAST BOP TEST LAST CSG TEST BHA INSPECTION (CUM. ROT HRS) PP1 @ KILL SPEED PP2 @ KILL SPEED @ SUMMARY OF OPERATIONS (SHOW HOURS FOR EACH OPERATION) : 24.00 REROUTE KATO PO~ER CABLES AND ASSOCIATED LINES. WELD DOWN MARKER BRACES. MOVE AND SET PARTS HOUSE. SET CONNEX ON TOP OF PARTS HOUSE. SKID RIG TO EAST NEXT TO MUD DOCK. CLEAN MOON POOl DECK OVER LEG 1. BEGIN ~ORK ON HELIPORT. BEGIN DISCONNECTING LINES TO PUMP ROOM FOR REROUTING. BEGIN TO SKID RIG TO THE ~EST. CONTINUING RIG MOVE. TIME (_HE_S)_. CUM. ROT. HRS ROTATING .... MUD MOTOR TRIPPING .... C & C .... REAM l NG SURVEYS JET REPAIRS .... FISHING .... NIP UP/DOWN /BOP/WH TESTING BOP /WH RUNNING CASING CEMENTING .... PICKUP/LAY DO,IN DS .... INSPECT BHA RIG UP/TEAR DOWN WAIT ON WEATHER/MAT .... EVALUATION .... rnR l NC, STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION APPLICATION FOR SUNDRY APPROVALS 1. Type of Request: Abandon X Sus.pend After casing ("A _. B & C'~l~3air well Change approved program Operation shutdown Plugging Time extension Pull tubing Variance ~ Re-enter suspended well Stimulate Perforate Other 6. Datum elevation (DF or KB) 116' K8 7. Unit or Property name HIDBLE GROUND SHOAL 8. Well number g. Permit number 86-25 10. APl number so- 733-20179-02 1. Field/Pool HGS "A, B, & C" POOL 2. Name of Operator Shell Western E&P Inc. 3. Address (~K --~ZT~/~ P.O. Box 576, Houston, TX 77001-0576 5. Type of Well: Development Exploratory Stratigraphic -,-,- Service X 4. Location of well at surface PLATF A, LEG 2, COND 12, 1677' FSL & 367' FEL 511, T8N, RI~, S.H. At top of productive interval La 8500' HD, 4820' FSL & 368' FEL Sll, T8N, R13W, S.H. At effective depth At total depth La 12,170' MD, 2174' FSL & 4907' FEL 51, TSN, R13W, S.H. feet 12. Present well condition summary Total depth: measured 7765 feet true vertical 7760.1 feet Effective depth: measured 7560 feet true vertical 6770 feet Plugs (measured) Junk (measured) Casing Length Size Structural Conductor 330' 20" surface 1990' 13-3/8" Intermediate Production 7765' 7" Liner Perforation depth: measured 6084' - 7289' true vertical 5597' - 6703' Cemented Measured depth True vertical depth 810 SX 1990' 1934' 824 SX 7765' 7151' Tubing (size, grade, and measured depth) 2-3/8", 4.7#, N-80 EUE La 6051'; 2-3/8" 4.7~, N-80 EUE La 6526' Packers and SSSV (type and measured depth) OTIS RDH PKR La 6033': BAKER "DB" PKR La 6436' AUG 0 1 1995 Naska 0il & Gas Cons. Commission ,Anchorage 13. Attachments Description summary of proposal X Detailed operations program BOP sketch 14. Estimated date for commencing operation 8/8/95 16. If proposal was verbally approved Name of approver Date approved 15. Status of well classification as: o,,__ x? Service Suspended lT. I hereby certity that the foregoing is true and correct to the best of my knowledge. Signed ~, ~,'.-~, -C~,~ ~~~ & G. S. NADY Title. H(~al~. - ASSE1' Ai)HIN. ./' ' FOR COMmSS'ON USE ONLY Date 7/31/95 Conditions of approval: Noti~i~ommission so representative may witness Plug integrity ~ BOP Test z.,,,'" Location clearance ~ Mechanical Integrity Test ~ Subsequent form required 10- ~-{ O 7 Approved by order of the Commission Original Signed By David W. Johnston IApproval No. Approved Copy Date Form 10-403 Rev 06/15/88 / ,, > :? ~,~; SUBMIT IN TRIPLICATE DESCRIPTION SUMMARY OF PROPOSAL MIDDLE GROUND SHOAL A41A-11LN · 11. 12. 13. 1. Move to A41A-11 (leg 2, conductor 12) and rig up. 2. Kill well. Test casing to 2,500 psi. 3. Nipple up 5,000 psi BOP stack and test. 4. Pull tubing strings and packer completion equipment. 5. Retrieve tubing conveyed perforating guns. 6. GIH with bit and drill out float shoe and 10' of formation. 7. Pressure test the shoe to an 10.5 ppg equivalent mud weight. 8. Directional drill to 12,170'MD-KB using a 6" hole. Final hole angle will be 50 degrees in a S05E direction. Log. Run a 5" production liner from TD at 12,170'MD-KB to 5,600'MD-KB. Cement liner. (Liner will be cemented above existing perforations.) Clean out cement and pressure test liner to 2,500 psi. Perforate. Run packer and tubing. (Packer at approximately 8,400'MD-KB.) Shell Western E&P IncQ 601 West Fifth Avenue · Suite 800 Anchorage, Alaska 99501 June 11, 1990 Alaska Oil and Gas Conservation Commission ATTN: Elaine Johnson 3001 Porcupine Drive Anchorage, Alaska 99501 SUBJECT: TRANSMITTAL OF REQUESTED INFORMATION REGARDING THE SWEPI OPERATED MIDDLE GROUND SHOAL FIELD Dear Ms. Johnson: In a recent telephone conversation you discussed with Ms. Susan Brown-Maunder information that would be helpful to you if we could provide it. Enclosed, for your convenience and use, are the following: location surveys showing the location of Platform A list of conductor/well locations (in relation to the SE corner of Sec. 11, T8N, R13W) for Platform A wells location survey showing the location of Platform C list of conductor/well locations (in relation to the SE corner of Sec. 23, T8N, R13W) for Platform C wells In addition you requested a revised copy of the Well Completion or Recompletion Report and Log (10-407) for the recently completed well C21-23. The well location at the top of the producing interval and the well location at total depth as been changed to reflect the actual surveyed location. If you have any further questions regarding these matters, please continue to contact Susan Brown-Maunder at (907) 263-9613. Very Truly~Yours, W. F. Simpson Manager, Regulatory Affairs Alaska Division WFS/SBBM/vj Enclosures cc: Susan Elsenbast-AOGCC RECEIVED JUN 1 Oil & Gas Cons. Commlssroll Anchomg~ MIDDLE GROUND SHOAL P1 atform "A" WELL/CONDUCTOR LOCAT IONS Leg I - Center of Leg i @ 1627'N & 435'W from SE corner of Sec.11, T8N, R13W, S.M. A 12-01 I 1632 A 11-01 2 1632 A 43-11 3 1630 A 34-11 4 16 25 A 34-14 RD 5 1622 A 22-14 6 1622 A 12A-01 7 1625 A 13-01 8 N & 437 N&432W N&430W N & 430W N & 433 W N & 437 W N & 440 W 1630 N & 440 W W from SE corner II II II II II II II II II ' II II II II II II II II II II II II Leg 2 - Center of Leg 2 @ 1681'N & 372'W from SE corner of Sec.11, T8N, R13W, S.M. A 42-11 9 1685 A 44-02 10 1685 A 42-14 11 1683 A 41A- 11 12 1678 A 11-12 13 1675 A 11-13 RD 14 1675 A 31-14 15 1678 A 44-11 16 N & 374 N & 370 W N & 368 W N & 368W N&371W N & 375 W N & 378 W 1683 N & 378 W W from SE corner II II II II II II II II II II II II II II II II II II II II II Leg 3 - Center of Leg 3 @ 1620'N & 321'W from SE corner of Sec. 11, T8N, R13W, S.M. Leg 4 - Center of Leg 4 @ 1566'N & 383'W from SE corner of Sec.11, T8N, R13W, S.M. A 33-11 25 1571 A 14-01 26 1571 A 12-12 27 1568 A 24-01 28 1564 A 13-12 29 1561 A 33-14 30 1561 A 41-11 31 1559 A 23-01 32 N & 385 N&381W N & 378 W N& 378W N&381W N & 385 W N & 388 W 1569 N & 388 W W from SE corner II II II II II II II II II II II II II II II t\lask~ Oil & Gas Cons. commissloa Anchora~ SBBC/mqs A I TgN S. ~.~. I [ I : ADL 18754 2,495,B40 '1623.5' t" ............. ZONE , ....... . ...... ,.-. · Zt t~ .'. Z4 I~ ~0 , - "~" ~ '' , ~ .. . ' ' "'.,""i. ' .... ............. ~ .'~. LOCATION OF ' -JUN 13 19[:~1 SELF' CONTAINED DRILLINO ql~s~o. ~il & Gas Con~. t bmmissioa PRODUC~NO PL,',T FOnM T 8 N S.M. , Anchora~* ' SHELL MIDDLE GROUND S},IOAL ......... : ........ - ~ ~, PLATFORM" ~ TTN S.M., z COOt< IHLET, ALaC"A~.,,, APPLIC,t, TION BY SHELL OiL CO. o 4oo~ 80o0 ,.~ooo k-z'.---?_?----- .... :_.. ~ ~' LOS ANGELES, CALIFORNIA I0 I0 15 14 T. 8 N., R.15 W., S.M. I ADL 18754 2 I LEG NO. I/q~/~, ' ~9 , ..,. .... f,. ~f,. .,. / ' 14 LEG NO. I LEG NO 2 LEG NO. ;5 LEG NO. 4 x : 2:52,78 $ Y : 2,4.85,845 PL AN£ X = 232,846 Y = 2,4.8 5,897 C 00RDIN,~ rES X= 2;52,896 Y = 2,485,835 X = 2 32,B33 Y = ~,485,783 1627' fi I~ 435'W FROM THE SE COR. OF SEC. II, TBN, RI3W, SM. PUBLIC LAND 1681' N & 372' W FROM THE SE COR. OF SE&II, TBN, RI3W, SM. DESC£1P T/ON 1620'1'4 'E~ 321' W FRO;,~ THE SE COR. OF SE&II, TBN, RISW, 156G'N B, 383'~,V FROM THE SE COR. OF SE&II, TSN,RI3W, S.1',I. GEODETIC COORDINA rES LAT.- 60°47'44.839'' LAT.-60°47'45.368'' LAT.-60°47'44.7G8'' LAT.- G0°,~7'44.244~'' LOl',lO.-151° 29'45. 112''. LONG.-151°29' 43.942" LONG.-151° 2 9' 42.'899'' LOI'~G.- 151° 29' 44.154" · .,.~"z' H.A.D. 1.I S'-'" ........ ~ ... ,..,,~LE I = I000' ~,,~:c,~:~ ~.~ ,.,,.,:. ~ SHELL Of:CO?..~""i','-~Y" ,.,~.¥ ',~., ,9os i! /_- 415 0- 2 I. ,.~~ ,,..,..~.=,,~.,. . . ' :,,,,=,~_ ~ .... ~ _- . July 13, 1987 Shell Western E&P Inc. 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 Alaska Oil and Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 Gentlemen: SUBJECT: SUBMISSION OF WELL COMPLETION REPORT FOR MIDDLE GROUND SHOAL A41A-11 Enclosed, in duplicate, is the Well Completion Report (Form 10-407) for Middle Ground Shoal well A41-A-11. If you have any questions, contact Susan Brown at (907) 263-9613. D~~ tr. uly yours,/~ Mana Regul atopy Affairs DLY/bc 0713b/DLYB STATE OF ALASKA ..... ALASKA OIL AND GAS CONSERVATION k, oMMISSION WELL COMPLETION OR RECOMPLETION REPORT AND LOG 1. Status of Well Classification of Service Well OILy GAS E~ SUSPENDED [] ABANDONED [] SERVICE [] , 2. Name of Operator 7. Permit Number Shell Western E&P Inc. 86-25 3. Address 8. APl Number 601 W. Fifth Ave, Suite 810-Anchorage, AK 99501 so- 733-20179-02 4. Locat~on of we, atsurface Platform A, Leg 2, Conductor 12. 1678'N and 9. Unit or Lease Name 368' W of SE corner of Sec. 11, T8N, R13W, SM Middle Ground Shoal At Top Producing lnterval @ 6084' (5593' TVD) 2104.96' N and 348.42' 'i0. WellNumber W of Surface location. A 41A-11 U-L At Total Depth @ 7765 (7760.1' TVD) 2720.3' N and 177.59' W of 'i1. Field and Pool Surface location. Middle Ground Shoal 5. Elevation in feet (indicate KB, DF, etc.) 6. Lease Designation andSerial No. A, B, &C · Pool 116' KB ADL 18754 , 12. Date Spudded 13. Date T.D. Reached 14. Date Comp., Susp. or Aband. 15. Water Depth, if offshore 16. No. of Completions 03/07/86 03/24/86 04/05/86 80 feet MSL dual , 17. Total Depth (MD+TVD) 18.Plug Back DePth(MD+TVD) 19. Directional Survey I 20. Depth where SSSV set 21. Thickness of Permafrost 7765' + 7760.1" 7721' + 7719.8' YESE~ NO[]I 318 feetMD 22. Type Electric or Other Logs Run DIFL/BHC-AL/PCM/CAL, GR/CNL/CDL, and RFT 23. CASING, LINER AND CEMENTING RECORD ,_ SETTING DEPTH MD CASING SIZEIwT.PER FT. GRADE TOP BOTTOM HOLE SIZE CEMENTING RECORD AMOUNT PULLED j3-3/8I' 6I# K-55 0 1990' 17-1/2'l 550sx "G"+additives 0I ,,,7" 29# N-80 1659 7765' 8-1/2" 824sx "G"+additives 0' ..... 7" 26# N-80 0 1659' 8-1/2" 24. Perforations open to Production (MD+TVD of Top and Bottom and 25. TUBING RECORD interval, size and number) SIZE DEPTH SET (MD) PACKER SET (MD) , 2-3/8",4~7# 6051" 6033' ~ [ ~ ~ ~ ~,f~ 2-3/8",4.7# 6526' 6436' ' 36. ACID, FRACTURE, CEMENT SQUEEZE, ETC. j i~i,,..; ~2 lj_ 1987 DEPTH INTERVAL (MD) AMOUNT& KIND OF MATERIAL USED N~sk~, 0i~ E G~s Cons. C0m~'!!ss~tiN E 27..i_'; PRODUCTION TEST Date First Production Method of Operation (Flowing, gas lift, etc.) " 04/07/86 FlowJn9 ,, Date of Test Hours Tested PRODUCTION FOR OIL-BBL GAS-MCF WATER-BBL CHOKE SIZE ]GAS-OILRATIO 04/07/86 2 TEST PER~OD lib 0 79.9 0 17/64] --- Flow Tubing Casing Pressure CALCULATED OIL-DEL GAS-MCF WATER-DEL OIL GRAVITY-APl (corr) Press. 1840 0 24-HOUR RATE I~ 0 182'1' 0 0 28. COP E DATA , Brief description of lithology, porosity, fractures, apparent dips and presence of oil, gas or water. Submit core chips. Development Wet 1. Upper string gas. Long string attempted oil producer, but tested wet and was shut ~n. Form 10-407 Submit in duplicate Rev. 7-1-80 CONTINUED ON REVERSE SIDE 29. NAME GEOLOGIC MARKI::~ ' ,, MEAS. DEPTH TRUE VERT. DEPTH 30. FORMATION TESTS Include interval tested, pressure data, all fluids recovered and gravity, GOR, and time of each phase. 31. LIST OF ATTACHMENTS 32. INSTRUCTIONS General' This form is designed for submitting a complete and correct well completion report and log on all types of lands and leases in Alaska. Item 1' Classification of Service Wells' Gas injection, water injection, steam injection, air injection, salt water disposal, water supply for injection, observation, injection for in-situ combustion. Item 5: Indicate which elevation is used as reference (where not otherwise shown) for depth measurements given in other spaces on this form and in any attachments. Item 16 and 24' If this well is completed for separate production from more than one interval (multiple completion), so state in item 16, and in item 24 show the producing intervals for only the interval reported in item 27. Submit a separate form for each additional interval to be separately produced, showing the data pertinent to such interval. Item 21' Indicate whether from ground level (GL) or other elevation (DF, KB, etc.). Item 23: Attached supplemental records for this well should show the details of any multiple stage cement- ing and the location of the cementing tool. Item 27: Method of Operation: Flowing, Gas Lift, Rod Pump, Hydraulic Pump, Submersible, Water In- jection, Gas Injection, Shut-in, Other-explain. Item 28' If no cores taken, indicate "none". Form 10-407 PERFORATION SUMMARY A 4lA-11 U-L ZONE AS FL 1 FL2 FP FS1 FS2 PERF. INTERVAL 6084 - 6136 6574 - 6638 6659 - 6677 6746 - 6772 6845 - 6857 6870 - 6881 0713b/SBBF WELL HISTORY A41A-11 U-L 02/20-02/21/86 02/22-03/01/86 03/01-03/06/86 03/06-03/07/86 03/07-03/10/86 03/10-03/11/86 03/12-03/21/86 03/21-03/24/86 03/24/86 03/25-03/26/86 03/27/86 03/27-03/28/86 03/28-03/29/86 03/30-04/02/86 0710/SBBF Finished skidding rig over Leg 2, Conductor 12 and rigged up. Plugged and abandoned A22-01. Set bridge plug at 750'. Cut 9-5/8" casing at 700' POOH. Layed down casings. Set a 100' column of "G~ neat cement. Cut and pulled casing to 450'. Spotted 300 sx of Class "G" cement w/10% Sand, 2% CaC12, and 0.3% D-31. Top of Cement @ 275'. Wait on cement. Drilled and surveyed to 1990'. Ran 50 joints of 13-3/8" casing (61#, K-55). Pumped 550 sx of class "G" cement w/8% gel, 3% CaC1, 0.1% D-31, and 0.1% D-6. Pumped tail slurry of 260 sx of Class "G" w/1% CaC1 and 0.75% D-31. Wait on cement. Pumped 170 sx of Class "G" w/2% CaC1. Test casing to 1500 psi for 20 min. Ran formation test to 13 ppg equivalent mud weight. Drilled and surveyed to 7356'. Ran DIFL/BHC-AL/PCM/CAL and GR/CNL/CDL logs. Ran RFT and shot 50 sidewall samples. Recovered 36. Drilled to 7765'. Ran 7" casing (29#, N-80, 8RD from 1659'-7765' and 26#, N-80, 8RD from 0-1659'). Cemented w/824 sx of '"G" w/0.8% FL-19, 0.3% CD-31, and 0.3% A-2. Tested BOP. Tested casing to 2500 psi for 30 min. Okay. Ran Gyro survey. Shut down for maintenance on filters due to volcanic ash. Cleaned out casing. Rigged up for perforating. Perforated w/4" port plug guns loaded w/4JSPF. Intervals perforated 6111'-6136', 6084'-6111'. Picked up perforating guns and Otis "WD" permanent packer and RIH. Attempted to set packer. Fished for packer. Retrieved packer and POOH. Set permanent "DB" packer. Perforated the following intervals' 6574-6638'.6870-6881I' 6845-6857', 6746-6772' ' 6659-6677t~ [ ~ i ~t~ [ ~ Atask2 Oil & Gc~s Cm-~s. Commission Anchor-age 04/02-04/07/86 Prepared to run 2-3/8" dual tubing for dual completion. Ran tubing. Install production tree and service rig for stackout. 0710/SBBF RETAIN THIS SECTION FOR YOUR RECORDS SIGNED PRINTS ~ NEG. t SEPIA PRINTS NEG. SEPIA PRINTS NEG. SEPIA PRINTS NEG SEPIA ABOVE RECEIVED FROM' DRES Alaska ~,~'r~ Gas Cons. Com~jssior~ Anchorage RETAIN THIS SECTION FOR YOUR RECORDS DRESSER ATLAS S !G N E D DATE 19__ SEPIA SEPIA SEPIA SEPIA RETAIN THIS SECTION FOP ~OUR RECORDS - / //' __ ___ PRINTS NEG. / //:.: _.',,'" ' .... PRINTS NEG. ABOVE RECEIVED FROM: · DRESSER ATLAS SEPIA SEPIA SEPIA SEPIA SIGN ED DATE 19.~_ Shell Western E&P, Inc. SCHLUMBERGER OFFSHORE SERVICES A Division of Schlumberger Limited HOUSTON, TEXAS 77001 May 2, 1986 601W. Fifth Avenue, Suite 810 Anchorage, AK 99501 Attention: Mr. Joe Frame PLEASE REPLY TO ICHLUMBERGER OFFSHORE IERVICE$ P. O. Box 1001 Kenai, AK 99611 Attention: Shelley Ramsey Gentlemen: Enclosed ore 2BL prints of the GCT, CET/GR, CBL, CCL/Perf. Record Company Shell Western E&P ., Well Midc~ Ground Shoal "A" #'41A-11 field Middle Ground Shoal ,County_ Kenai on: additionalprintsare being sentto: 1BL prints, original film Shell Western E&P~Inc. P. O. Box 527 Houston~ TX 77001 Attn: Log Files, WCK 4147 BL prints, 1 Reverse Folded Sepia State of Alaska Oil & Gas Conservation Commission 3OO1 Porcupine Drive Anchorage, AK 99501 ~ttn: H. W. Kugler 1BL prints _Shell Western E&P: Inc P. O. Box 527 Houston, TX 77001 Attn: R. J. Vallejo, WCK 1134 I gl- prints Shell Platform "A" · (2/13 ~" ~ ' o,~zl K~n~z Office North Star Route #1 P. O. Box 485 Wik Road Kenai, AK 99611 1BL prints, I Mylar ARCO Alaska~ Inc. P. O. Box 100360 Anchora egK~AK 99501 Attn: J. C. Havard prints 2 BL prints, 2 Reverse Rolled Sepia Chevron U.S.A., Inc. P. O. Box 107839 Anchorage, AK 99510 Attn: J. L. Weaver prints PLEASE SIGN & RETURN ONE COPY OF THIS TRANSMITTAL. The film is returned to Shell-Houston We appreciate the privilege of serving you. Very truly yours, SCHLUMBERGER OFFSHORE SERVICES $05--1565-A David N. Rebel DISTRICT MANAGER Shell Western E&P Inc. A Subsidiary of Shell Oil Company P.O. Box 576 Houston, TX 77001 April 9, 1986 State of Alaska Alaska Oil & Gas Conservation Commission Mr. H. W. Kugler 3001 Porcupine Drive Anchorage, AK 99501 Dear Mr. Kugler: Enclosed is the sepia you requested me a (713) 870-4457 if you have any Sincerely, Terri M. Young Alaska Division TMY: eb Enclosure on well MGS A-41A-11. Please contact questions. ~ Alaska Oil & 6as Cons. Commission CRCT8609904 STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501 (907) 279-1433 RE: Receipt of the following material which was transmitted via is hereby acknowledged: DESCR I PT ION 0-73/ RECEIVED: DATED: Copy sent to YES sender ,o ~ TO: ALASKA OIL STATE OF ALASKA AND GAS CONSERVATION COMMISSION 3001 Porcupine Drive Anchorage, Alaska 99501 (907) 279-1433 RE: Receipt of the following material which was transmitted via is hereby acknowledged: QUANT I TY DESCRIPTION Copy sent to sender NO Shell Western E&P Inc. Q 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 March 10, 1986 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 Gentlemen- SUBJECT: SUNDRY NOTICE OF INTENT TO CHANGE PLANS FOR MIDDLE GROUND SHOAL WELL NUMBER A41A-11 Enclosed is a Sundry Notice of Intent to change plans for Middle Ground Shoal Well No. A 41A-11. The change involves the 13-3/8" casing point, which should be reached within the next day or so. If you have any questions concerning this notice, contact Susan Brown at (907) 263-9613. Very truly you rs, FOK' D. L. Yes land Sr. Staff Environmental Engineer Alaska Division SBB/kka SBBC/aogcc. 5bb STATE OF ALASKA ALASKA OIL AND GAS CONSERVATION C~JMMISSION SUNDRY NOTICES AND REPORTS ON WELLS 1. DRILLING WELL J~ COMPLETED WELL F'I OTHER [] 2. Name of Operator 7. Permit No. Shell Western E&P Inc. 86-25 3. Address 8. APl Number 601 West Fifth Avenue, Suite 810, Anchorage, Alaska 99501 50- 733-20179-02 4. Location of Well Conductor 12, Leg 2 of Platform "A". SE corner of Sec. 11, T8N, R13W 5. Elevation in feet (indicate KB, DF, etc.) 1678'N & 368'W of the I 6. Lease Designation and Serial No, 12. 9. Unit or Lease Name Middle Ground Shoal 10. Well Number A41A-11 11. Field and Pool Middle Ground Shoa! 116' ADL 18754 "A, B: C, & D" Pnnl Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate) Perforate [] Alter Casing [] Perforations [] Altering Casing [] Stimulate [] Abandon [] Stimulation [] Abandonment [] Repair Well [] Change Plans [~ Repairs Made [] Other [] Pull Tubing [] Other [] Pulling Tubing [] (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.) 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Shell Western E&P Inc. is planning to change the 13-3/8" casing point (see attached prognos i s). 14. I hereby certify that the foregoing is true and correct to the best of my knowledge. Signed ~ ~].~ ,~ ¢. ...... // ~/' ,~ Tid~Division Drillinq .En.qineer Date The space below for Commission use / Conditions of Approval, if any: Approved by. ~Fprovea C~>py R~turned ._.~ COMMISSIONER By Order of the Commission Form 10-403 Rev. 7-1-80 Submit "Intentions" in Triplicate and "Subsequent Reports" in Duplicate ALASKA DIVISION DRILLING PROGNOSIS '~/20/86 WELL' A41A-11 LOCATION' PLATFORM 'A', LEG 2, OBJECTIVE. AS-GD EVALUATION GEOLOGY CONDUCTOR 12 AFE NO: FIELD: M G S EST. ELEVATION: DRILLING 116' CORES ELEC. MUD SURVEYS LOGGER SIGNIFICANT FORMATIONS WELL DEPTH TVD MD CASING AND CEMENT HOLE DEV. HOLE AND DIR. SIZE CONTROL MUD PROGRAM 3000' 0 24' Conductor KOP 320' 332% 13-3/8' CSG 1951' AS A2S FL 5600~ 5650' 6010L: FP 6170% ..320 -332' :-2000' 3000' -6061' -6117' -6518' -6698' FS ©B GD TD 6250~6 789' 6600'- 6730; 6940'- -7186' -7334' -75'72' -'1 17-1/2" 8- /2" FebruarY 6, 1986 Mr. D. L. Yes iand Shell Western E&P, inc. 601 West 5th Avenue, #810 Anchorage, Alaksa 99501 TELECOPY NO. 276-7542 Re: A 4lA-11 Shell Western E&P, Inc. Permit No. 86-25 Sur. Loc. 167.8'N,368'W of SE cor, Sec. 11, TSN, R13W, SM Btmhole Loc. 4404'N,331'W of SE cor, Sec. 11, T8N, R13W, SM Dear Mr. Yes land Enclosed is the approved application for permit to drill the above referenced well. The permit to drill does not indem~nify you from the probable need to obtain additional permits required by law from other governmental agencies prior to commencing operations at the well site. To aid us in scheduling field work, please notify this office 24 hours prior to commencing installation of the blowout prevention equipment so that a representative of the Commission may be present to witness testing of the equipment before the ~urface casing shoe is drilled. Where a diverter system is required, please also notify this office 24 hours prior to commencing equipment installation so that the Commission may witness testing before drilling below the shoe of the conductor pipe. Very truly y~rs, C. V. Chatterton Chairman of Alaska Oil and Gas Conservation Commission BY ORDER OF THE COI~R~ISSION dlf Enclosure cc: Department of Fish & Game, Habitat Section w/o encl. Department of Environmental Conservation w/o encl. Mr. Bill H. Lamoreaux STATE OF ALASKA ALASKA OI '~ND GAS CONSERVATION CC-'MISSION SUNDRY NOTICES AND REPORTS ON WELLS DRILLING WELL C! COMPLETED WELL 2. Name of Operator She!] Western E&P 3. Address 601 West 5th Ave., 4. Location of Well Conductor 12, Leg 2, Center Leg 1 @ 1627'N Sec. 11, T8N, R13W Inc. Suite 810, Anchorage, AKg9~0 @ 50.62'N & 67.36'E from & 435'W from SE Corner 7. Permit No. OTHER [] 69-20 8. APl Number 150- 733-20179-00 9. Unit or Lease Name MGS [] [] 10. Well Number A 22-0 1 5. Elevation inlfeet(indicatel 5 D, F.KB' DF, etc.) I 6. LeaseADLDesignationl8754andSerial No. I 12, Check Appropriate Box To Indicate Nature of Notice, Report, or Other Data 11. Field and Pool Middle Ground Shoal "G" Pool NOTICE OF INTENTION TO: SUBSEQUENT REPORT OF: (Submit in Triplicate) (Submit in Duplicate} Perforate [] Alter Casing [] Perforations [] Altering Casing Stimulate [] Abandon X~ Stimulation [] Abandonment Repair Well [] Change Plans [] Repairs Made [] Other Pull Tubing [] Other [] Pulling Tubing Fl (Note: Report multiple completions on Form 10-407 with a submitted Form 10-407 for each completion.} 13. Describe Proposed or Completed Operations (Clearly state all pertinent details and give pertinent dates, including estimated date of starting any proposed work, for Abandonment see 20 AAC 25.105-170). Plug & Abandon.. WeII is watered out. Slot wiI] be used to dri]] A 41A-11. Plug & Abandon operation should begin on or about Februaky 1, 1986. Details of P&A are on attached worksheet. · RECEIVED JAN 2 3 19B6 'Naska 0il & Gas Cons. ~0mmissi0n Anchorage 4. I hereby certify that the foregoing is true and correct to the best of my knowledge. i...-~-------~ - - , _.~.~_~--,------._T~e Production Superintendent ' e space below for Commission use ondition$ of Approval, if any: Date I /~ / L A By Order of ppro~'ed by COMMISSIONER the Commission Submit "Intentions" in Triplicale PLUG & ABANDON A-22-01 MIDDLE GROUND SHOAL FIELD OBJECTIVE' Plug & abandon. CASING' 9-5/8" 40# w/1190 sx at 10,935' 7" 29# liner from 10,812' - 11,691' PERFORATED INTERVAL: GR-GS 10,645' -85' HC-HZ 10,940' - 11,689' STATUS: Well shut-in, S.S.S.V. and Gas Lift Valves in place PROCEDURE: · Notify State before operation begins. Hold safety meeting. Bleed off annulus. Flange off gas injection line. RU slick- line and pull S.S.S.V. Bullhead down 150 BBL sea water, volume equal to tubing plus casing volume below packer, plus 25 bbl. Make 2¼" drift run.. Pull gas lift valve No. 8. Cir- culate'annulus with seawater to remove any remaining'gas. 2. Move rig over conductor. Install B.P.V.. ND tree. NU BOP. . Pull and lay down tubing and packers. Tubing string detail sheet attached. Packers are Guiberson Uni-VII HD which have a straight pull release of approximately 24,000 lbs. over tubing string weight. Do not exceed a pul) of 110,000 lbs (80% of minimum yield strength). If packers do not pull free, cut between packers and pull. If unable to pull free, cut 60' _+ above packer, TOH wi th tubing. TIH with drillpipe and fish packer{s) with overshot and washpipe. · TIH with 8-1/2" bit, casing scraper, and drill collars and clean out 9-5/8" to top of liner. Circulate hole clean. Do not use mud until drilling operation begins to avoid plugging perforations to be squeezed. Be TIH with cement retainer on drill pipe and set at 10,750' Retainer will be used because of open perforations betwJen 10,645' - 10,685'. RECEIVED JAN 2 ) 1986 JHFA/JHF12371.1 Alaska Oil & Gas Cons. Commission Anchoraoe A 22-01 CEMENT SQUEEZE 6o Monitor backside throughout squeeze. If necessary, pump into open perfs above retainer to avoid sticking drillpipe. Establish an injection rate of at least 1 BPM down dri)lpipe at a pressure not to exceed burst rating of drillpipe with a 1.3 safety factor. If injection rate can not be established, sting out of retainer and spot 500 gal of mud acid to retainer, sting in and pump below. Pump 10 BBL freshwater spacer in front of and behind cement. First 5 BBL of freshwater pumped should be spotted in casing before stinging into retainer. 5 bbl of fluid will occupy 175' of 7" casing/3½" drillpipe annulus or 675' of dri)lpipe (3~" 13.3#) volume. This will isolate cement from salt water (flash setting) in case cement has to be reversed out. Mix and pump 530 sx 15#/gal Class G cement with a fluid loss of 50 cc/30 min. and a set time of no less than 4 hours at 150°F. This volume of cement equals a 25% excess over calipered open hole volume plus cased volume above retainer. Cement to be shop tested before delivery. 0 With 20 BBL of cement left in drillpipe, sting out of retainer and dump cement from .retainer to 10,490'. Pull two additional stands (10,370') and reverse out. · Tag cement plug and pull up 10'. Change over brine to lO#/gal mud. To meet state requirements, it is necessary to leave a fluid of equivalent density as original drilling mud through interval be plugged and abandoned. Maximum mud weight during drilling of original well was lO#/gal. TOH. Continue with Drilling .Prognosis for A 41A-11. RECOMMENDED' APPROVED' DATE: DATE' RECEIVED JAN 2 1986 Alas~ Oil & Gas Cons. Commission Anchorage JHFA/JHF12371.1 MOS A22-01 1 O# MUD UT O PLUG AND :ABANDON PLUG BETWEEN . . 00' _]~TOC 5A,T2R0,4 9 0' · ~..:.'.:'..~.:-~ 1 0,6 4 ~~.?'..':..~'::~ 10,685' GS -~ .[~:~.71~ CEMENT RETAINER AT 10,750' 650'- 750' 9-5/8' AT 10,935' 1 O,94O' HC 7" PERFORATED LINER BETWEEN 10,812' - 11,691' (UNCEMENTED) 11,689' HZ RECEIVED JAN 2 3 1986 Alas~ 0ii & Gas Cons. Commission Anchorags 1/7/86i 13 BEFORE Item No. ".Completion Detail MD 1. Otis Ball Valve 313 2. Camco KBM Mandrel 2569 3. Camco KBM Mandrel 5096 4. Camco KBM Mandrel 6930 5. Camco KBM Mandrel 8299 6. Camco KBM Mandrel 9273 7. Camco KBM Mandrel 9854 8. Camco KBM Mandrel 10254 9. Camco KBM Mandrel 10530 10. Guib. Uni VII PKR 10567 11. Camco KBM Mandrel 10638 12.. Guib. Uni VII PKR 10735 13. E.O.T. 10766 TVD 2101 3733 4989 5908 6552 6946 7256 7486 TUBING DETAIL 3½ J-55 EUE IPC to 10767 CAS I NG DETA I L 9 5/8" ~ 10935 7" Perforated Liner w/64--3/8" holes/ft. Hung at 10813' to 11701' GR-GS .Perfs 10645-10685 GR-GS Perfs 10940-11689 HC-HZ Perfs 10940-11091 11127-11515 11537-11689 RECEIVED JAN 2 ~ 1986 ~,'~ Oil & Gas Cons. ~ommJssion ~chor-~Oe 1-26-74 Perforate thru tubing, 10,992-11,077 11,355-11,385, 11,402-11,432 11,467-11,497 FILL AT 11,555' 7-3-74 Perforate w/link jet gun in csg. 11,540-11,650, 11,360-11,500, 11,290-11,390, 11,160-11,180 11,060-11,085, 11,010-11,025 PBTD 11,705' o. Shell Western E&P Inc. 601 West Fifth Avenue · Suite 810 Anchorage, Alaska 99501 January 14, 1986 State of Alaska Alaska Oil & Gas Conservation Commission 3001 Porcupine Drive Anchorage, Alaska 99502 Gentlemen: SUBJECT: SUNDRY NOTICE OF INTENTION TO P&A AND APPLICATION FOR PERMIT TO DRILL Shell Western E&P Inc. (SWEPI) is currently planning to drill another well, A 41A-11 from existing Platform A, in the Middle Ground Shoal Field. In preparation for this well, SWEPI is planning to plug and abandon the well A 22-01. Enclosed are triplicate copies of the Sundry Notice of Intention to plug and abandon the Middle Ground Shoal well A 22-01. The operation is scheduled to begin February 1, 1986. Also enclosed are triplicate copies of the Application for Permit to Drill the Well, A 41A-11. The drilling operations are expected to begin February 15, 1986. Please direct any questions on these matters to Susan Brown at (907) 263-9613, or to myself at (907) 263-9617. Very truly yours, ¥i~, L. Yesland Sr. Staff Environmental Engineer Alaska Division SBB/kka Enclosures RECEIVED JAN 2 2 1986 0ti & Gas Oorm, Commission A~ora~ SBBC/aogcc.6a ~ STATE OF ALASKA ALASKA L,._ AND GAS CONSERVATION CC. ~.~IlSSION PERMIT TO DRILL 2O AAC 25.005 la, Type of work. DRILL REDRILL DEEPEN lb. Type of well EXPLORATORY [] DEVELOPMENT OIL ~ DEVELOPMENT GAS [~ SERVICE [] STRATIGRAPHIC SINGLE ZONE MULTIPLE ZONE 2. Name of operator Shel I Nestern E & P Inc. 3. Address 601 West Fifth Avenue, Suite 810; Anchorage, AK 99501 4. Locat~c~r~u~F,~)~t s~rface 1Z, Leg 2 crF Platform "A". 1678'N and 368'W of SE comer topOf~'o' Sec. 1.1, T8N, RI:~/.. At proposeo proouclng interval 2290'N and 190'W of surface at 6010' TVD and 2570'N and 80'W of surFac At total depth at 6600'1~/D 4404' north and 331' ~est of SE comer of Section 11, T8N, R13W . 5. Elevation in feet (indicate KB, DF etc.) ] 6. Lease designation and serial no. 116' KB I ADL 18754 12. Bond information (see 20 AAC 25.025) ~tL::~dJde - INA Shell 0084 9. unit or lease name Middle Ground Shoal 10. Well number . A 41A-11 11. Field and pool Middle Ground S~oal A, B, C, & D Pool $ Type Oi] & gas surety and/or number 11C 136503 Amount $ 100,000 13. Distance and direction from nearest town 17 miles NW of Kenai re,es 16, Proposed depth (MD & TVD) 8201' IvD 7500' TVDfe"t 14. Distance to nearest property or lease line 4700 feet 17. Number of acres in lease 3746 15. Distance to nearest drilling or completed well 2600 feet 18. Approximate spud date Februar~ 15, 1986 19. If deviated (see 20 AAC 25.050) 120. Anticipated pressures !2~ .. psig@~ Surface KICK OFF POINT 332' 'feet. MAXIMUM HOLE ANGLE 35 oI (see 20 AAC 25.035 (c) (2) 39!4 .... psig@ 7~)0 ft. TD (TVD) 21 Proposed Casing, Liner and Cementing Program SIZE CASING AND LINER SETTING DEPTH QUANTITY OF CEMENT Weight Grade Coupling Length MD TOP TVD (include stage data) Hole I Casing ,17 1/2"113 3/8" 8 1/2" 1 7" 61#/ft 26~/ft K-55 BTC LTC 22. Describe proposed program: See attachments for greater detai 1. 1759 7556 0 I 0 MD BOTTOM TVD I 1759 I 1700 75561 6940 513 sx G+8% GFI; 100.~x G 200 sx ~P, addJtives , RECEIVEF:? 23. I hereby certify that the foregoing is true and correct to the best of my knowledge SIGNE / '~/~D TiTLEDivJsion Drilling Engineer The space below for Commission us~t~ a CONDITIONS OF APPROVAL Samples required Mud log required mYES ~NO [~YES ~NO rermit number Appr°valoJ~t~/0 6 / 8 6 Form 10-401 ~N,~.~ ,/, ~ _~~~ Rev1 7-1-80 Directional Survey required J APl number ~YES F-1NO 50- /~,-~3 - 2~)/f'/~-~)~- SEE COVER LETTER FOR OTHER REQUIREMENTS ,COMMISSIONER DATE l~eb~:ua]:Y 6, 1986 by order of the Commission Submit in triplicate 1/9/86 ALASKA DIVISION DRILLING PROGNOSIS WELL: A41A-11 LOCATION: PLATFORM "A" OBJECTIVE' AS-GD LEG 2, CONDUCTOR 12 EVALUATION GEOLOGY AFE NO: FIELD' M G S EST. ELEVATION. DRILLING 116' CORES ELEC. MUD SURVEYS LOGGER SIGNIFICANT FORMATIONS WELL DEPTH TVD MD CASING AND CEMENT HOLE DEV. HOLE AND DIR. MUD SIZE CONTROL PROGRAM RECEIVED J^N 2 2 1986 ~klambka OH & Gas Conm, Commlm~h)n o -r- 3000' LU (D 0 0 24" Conductor KOP 13-3/8' CSG AS A2S FL FP FS GB GD TD 320' 332' 1700' - 2833' - 5600t 5650' 6010~: 6170' 6250LL 6600% 6730' - 6940'.. i oil 32O 332' 1759,~1[ 3000' ...6035' 6O9O' :6484' 6661' .... 6750' o I -7164' .7314' -.7556' ~ 17- /2" 8-1/2" Alaska Oil and Gas Conservation Commission January 10, 1986 PROPOSED PROGNOSIS FOR A-41A-11 1) Move rig over conductor 12, leg 2 (A-22-01). 2) Set bridge plug at 780' MD and spot 50' cement plug to 730' MD. 3) Cut and pull 9 5/8" casing at 700'. Install diverter system. 4) Set bridge plug at 500' MD and spot 50' cement plug to 450' MD. 5) Cut and pull 13-3/8" casing to 400' MD. 6) RIH to 400', spot cement kick-off plug to 275'+. 7) Kick off and directionally drill 17-1/2" hole to 13-3/8" casing point at 1700' TVD (1759' MD). 8) Set 13-3/8" casing and cement to surface. Nipple up and test BOP to 3000 psi. 9) Directionally drill 8½" hole to 7" casing point at 6940' TVD (7556' MD). 10) Attempt to run the following wireline logs GR, SP, DIL, BHC/GR, FDC, CNL, RFT, SWS. 11) Set 7" casing and cement to 1000' above shallowest potentially productive sand. 12) Proceed with production prognosis. VEU/kka RECEIVED Ataska Ott& Gas ConS, (;ommi~sion AnchomrJe SBBC/A-33-11 list Alaska Oil & Gas Conservation Commission ATTACHMENT The maximum pressure gradient is expected to be .520 psi/ft. Maximum BHP is expected to be .520 x 7,500 = 3,914 psi. Maximum surface pressure is expected to be 1,200 psi, assuming a full column of .360 psi/ft, oil. The well will be drilled in compliance with the Alaska Oil & Gas Conservation Commission's regulations issued July, 1981. As noted in the drawing of the diverter, both ~" mechanical valves will be kept in an open position until the preventer is closed. The mechan- ical valves will be wired open and tagged with instructions concerning proper procedures for closing a valve in the event that the preventer is cl os ed. RECEIVED JAN 2 2 1~86 Oil & Gas Co~s, Coinmmsi~ A~hor~e SBBC/aod2 ~..,_~_MGS PLATFORM A ,, . J,, ,,:. ................. :4~ ~1~' '41 . ' : I ' : ' : , ' . . ' '' , , L' , ~ -~: : ~:-i ~' ! T~7 ....... ~:-"~ ] . ~ i" . 150 X 150' TARGET-~ ~ , ' 5 Lq~'u .vu~ Z ,6484 MD J --- I~~'-~ ~--~' MAGNET ~~,_ ??.', DIVERTER ASSEMBLY FLOW LINE 20" ANNULAR PREVENTER 2000 PSI ,,, I I DIVERTER SPOOL ,, 2O ' RISER - i~/~" LINE · LINE BOTH/I~" MECHANICAL VALVES WILL BE IN AN OPEN POSITION UNTIL THE PROPER DIVERTER LINE IS SELECTED AFTER THE ANNULAR PREVENTOR HAS BEEN CLOSED TO BE CONNECTED SO THAT VALVE IS OPEN WHEN ANNULAR PREVENTER IS CLOSED N.T.S. SHELL MINIMUM BOP STACK REQUIREMENTS Min. Min. No. Item I.D. Nominal 1 '"Flowline" . '7;" , 2 ,,~iII Up Li_ne 3 Drilling Nipple ~4 Annular Preventer 5 Two single or one dual hydrualically operated rams 6 Drilling spool with 2" and 3" min. outlets 7 Gate Valve 3 1/8" '8 'Gate Val~e Power Operated ' 3:1/8'" 9 Line t° choke manifold 3 10 Gate Valve 2-1/16" 11 Check Valve 2-1/16" 13 Casing SpoOl ...................................... 14 Valves Gate 1-13/16" ~ 5 COmpOund Pressure Gauge connector ~16 Control p!_ug,°r valve i-'13/i6" ,17,., Kill line to rig mud pump manifold :2" 18 '2" X 2" ~ 2" cross " ...... *NOTE: Additional ~oeclflcations for Air/Gas Service are qiven in Shell Well Control Manual, Appendix 6.18. A rotating head Shall be orovlclecl on Air/Gas Service OPTIONAL ~ 2 Wear flange or bore protector .... 19 Gate valve , , 20 Line to roadside connection 2" 21 Rotating blowout preventer 22 'Gate Valve 'power operated DRAWING & CHECK LIST 104A SHELL CLASS 5BISM SURFACE INSTALLATIONS NORMAL AIR/GAS* FOR AIR/GAS DRILLING CONFIGURATION A ..... . ....... ~ ANNULAR PREVENTER BLIND RAM PIPE RAM Location ol~t ional Well History File APPENDIX Information of detailed nature that is not particularly germane to the Well Permitting Process but is part of the history, file. To improve the readability of the Well History file and to simplify finding information, information of this nature is accumulated at the end of the file under APPENDIX. No special effort has been made to chronologically organize this category of information. LIBRARY TAPE CURVE SPECIFICATIONS Company SHELL WESTERN E. & P., INCi-~ ~j Well MGS A 4lA-11 Field MIDDLE'GROUND SHOAL County, State KENAI~ ALASKA Date 3/2,1/86 .o Curve Name.. (Abbrev.) Standard Curve Name Logs Used Scale SSD SHORT sPACE DETECTOR CN/CDL · · · LSD LONG SPACE DETECTOR " 'CAL CALIPER " 6 - 16 · ,, SSN SHORT SPACED NEUTRON " LSN LONG SPACED NEUTRON " , , GR. GAMMA RAY " '~' 0 - 100 DEN DENSITY , ., " '-, ,, 2 - ,3 ¢ORR CORRECTION CURVE ". ,,' , -.5 - · .. . _ CN ,. COMPENSATED NEUTRON '" , 60 - 0 · Sp SELF POTENTIAL DIFL/~c ' -100 - 0 AC ACCOUSTILOG DELTA-TI " 150 -'5Q,, I '- RFOC RESISTIVITY FOCUSED " .2 ' 2.000 RILM RESISTIVITY MED%UM ' ,, , " , ,'~ " · · . RILD .... R~$ISTIVITY,DEEP J , ., " · · , ,, -. · . .. _LL W~STERN E&m INC. V 2Z, 58. 6t .7 35.2 14.0 35.1 111 .9 2.36 0.07 7.3 8.0 2~78. 47.5 28.7 13.3 42.5 138.8 1 .76 0.03 23.7 17.3 20.0 2498. 5~.2 27.8 12.9 27.8 108.9 2.57 0.08 7.8 7.2 2558. 35.0 26.~ 13.2 26.2 108.3 2.31 0.09 6.3 5.3 2598. 18.0 22.7 tZ.1 51.~ 130.3 1 .53 0.00 136.6 57.4 45.2 2618. 6t.9 24.9 12.4 31.8 102.4 2.41 0.1~ ~.7 5.9 4.1 ~7:;~ ~? ~; ~"~:~ ::-": :::7~;7:~ .................... 7";-~'- ........................... 2638. 43.5 8.8 9.9 29.5 96.8 2.27 0.08 8.4 9.4 9.1 2658. 53.1 2 11 I 32.8 107.7 2.34 5.9 8. 46.8 2 4 .6 13.0 14.4 5 .Z 6. 7.9 6.8 2 9.1 9.5 9.2 8. 9.4 20.4 111.1 1 1 . ~, ...... ~";'"'1 ~ 3. ~ '~-~';-~: ............... i'"~';'~' 20.8 19.0 ,J.~ 2 1.2 · 6 -7 9. 1978. 0.0 0.0 0.3 0.0 0.0 0.00 0.00 0.0 3.,..3 0.0 1998, 59,2 84,7 1 2,5 29,3 10~,7 2,44 0.11 ~,3 6.~ 7.5 20!8, 60,2 39,0 10,3 26,6 123,2 2,31 0,03 ~,9 2038, 49,6 90,2 12,0 27,8 122,.3 2,32 0.11 7.3 7.5 7.~ 2058, 49,5 105,1 13,1 28,0 123,5 2,34 0,09 7.3 7.3 7.6 2098. 64,3 103,0 14,2 33,5 107,9 2,45 0,09 6.8 6,3 7.5 ......... 2118, 74,4 99,8 13,3 37,5 127,3 2,04 0,06 11 .6 16.1 14.1 2138, 45,2 5~,8 12,5 44.9 132,2 1 ,75 0,03 21,5 16.5 21 ,4 ::.:~:~;:.:-)(~. ~:~:. ::::::::::::::::::::::::::::::: .:~..~:~:.~:~(~.,. ~:~..~:~..~:~.:-..:..~:~:~?::;~:~: :~ ::~:.~::¢¢: ~:~:.):~:~ ~:~? .~:~:~..:~:);:~.~:::~ :¢:.:.: ;t~:"-;:::.~.:;::: : 21~8, 61,1 59.9 13.0 34,6 111.9 2,41 0.15 7,3 ~.5 7,0 8 9 8 · 6 9.3 2178, 52.3 5 12 5 31,0 1t6,5 2,35 8.2 8,0 3,7 2198, 54,5 5 2218, 15,4 4 ~2 0 8.8 11 7.5 -LL, WESTERN EDP INC, V 414-tl ~ 2958. 66.0 -63.4 10.1 32.5 106.4 2.40 ~.12 10.2 11 .2 11 2978. 52.S -73.1 10.0 27,9 107.5 2.3~ 0.11 10.9 12.2 12.0 2998. ~3.0 -70,6 11.5 ~.2 129.~ I ,~9 -0.02 52.0 2~.2 3018. ~1 .9 -66.6 11 .7 51 .2 131.3 t .54 -0.02 117.8 36.8 3038, 65,4 -5~,8 11,6 28,4 96,3 2,43 0.10 I0.~ 9,2 10.2 3058, 69,5 -55,2 12,2 30,2 93,9 2.51 0.12 9.1 10.8 3078. 72,5 -58,8 12,5 30,0 97,9 2.~7 0.07 9.3 .~.2 ~.7 3098, 72,3 -57,5 12,5 33,0 101,2 2,51 0.11 8,3 7,9 .~.1 3118, 72,0 -~6.6 12,5 30,5 95,1 2,50 0.09 8,9 9.1 10.1 8,7 8.7 9.1 3138, 70,8 5 12 0 34,5 97.6 2,49 8.3 ~,1 ~.0 'lO,g 11,3 3 6,6 - 6.4 6.1 ~ . ~ - Z 20. 3 ........ ~'";"~ 8":"2 8, ~,6 1 2,3 ,OC 1 :"7 .................... 57i ....................... 3278, 38, C -126,4 9,0 23,4 99,~ 2,32 0.07 14.0 5.0 ~.2 3298. 38.1 -129.1 9.1 22.8 100.3 2.31 0.05 1~.8 5.3 331 8 · 87. I -65.1 10.8 29.9 96.8 2.49 O. 09 5.3 7.7 3.0 3358. 34.6 -85.5 11.3 53.1 133.2 1.56 -0.03 37.~ ~5.0 WESTERN E&P INC. 41~-!1, 3418. 38.0 -139.5 9.7 25.6 102.8 2.30 0.08 12.7 5.0 ~.~ 3438. 38.8 -1~3.6 10.6 24.4 110.~ 2.31 0.0~ 12.4 5.3 ~.3 3458. 38,6 -142.5 9.2 I9.5 87.6 2.40 0.07 19.1 6.6 3478. 37.4 -145.5 9.1 24.1 102.3 2.30 0.07 13.2 4.7 3.~ 3498. 45.& -113.4 9.4 20.8 91.2 2.43 O.Og 20.5 7.6 7.0 ~:~E~''~ ~'~:~ ~"?~?~: '~ ~T'~ ~ ~?:~?:~.'::'~:~7"'":7= ................. "'~ ............................................................................................... ~ 3518. ~3.0 -91 .9 10.2 28.2 93.8 2.~8 0.12 10.0 8.6 8.6 ~:~ ..Z'"_Z'.'~_'Z~' ........................... ~...,__~ .................... !.?.~..2 .................. %...~. ............................... 3538, 50,8 -1~8,2 9,0 23,0 ~5,1 Z,36 0,09 19,0 14,1 12.1 Z:??~$~:;'~}7~%S::~ ~}~7= %~}7~7.~??~$~?~}$~ ~'~'~>"~ :}%;'"~ T~?~: ~::~}7T"~?~"~?~~?$~$~? Z' ?~:~'"'F777~%~'~:::~' 77~ ~ 7"=f~T T~" ~?~7'~"" "": ............................... ~ .................................................................................................... 3558, C8,1 -1~7,0 9,0 23,8 98,1 2,34 0,0~ 15,~ 11,5 10.4 3578, 49,5 -150,6 9,1 ZZ,6 97,~ Z,3~ 0,0~ 15,4 13,2 11 ,6 3598. 86.7 -111.4 10.1 33.2 91.7 2.49 0.13 tl.4 S.~ 0.1 0,~ ~.8 3618. 29.0 -11 10 6 47.2 125.9 1 54 ~'~9.0 55.7 60.7 '-¢-~'-? ................. '~' T? ................................... 3638. 86.8 -11 3658. 59.2 -12 36 ' 1 ' ' 7,6 ,. 9 0 7. 11 74 !~!:7"-~::i~';'~"~ ........................... ~";"'0 ...................... ?'";'"~ .................. ~'"'~"~ ........................................ 3758. 63.6 -99.6 10.0 32.6 9/*.8 2.45 C;. f27 7.9 8.1 ~-.1 ~:~~i:::::~::::.':.S:~ ~;:::::~::~: ~:. ~:c:'~:~:::'~..-~:~"~: :~::':s.::2:i'S 2;~:::- :0.0 4 1 6.8 I 5 · 4 1 3. u ~'~ 777'"':'0':T0:~ ................ i-?'70 ............... ~"7';"~ ................ i"6";'"2 ...................................... ............ ~-'~i"s:; ............................. ~'T~O'' .................. ~'"~72 ........... ~'~'0"'~~ ......................... ~%3' ......................... '~%'"~' ............................. 2";"~'"~ ............................ o-';"o"~ ~..;. ~ ~-.: ~ o., .~ ~., ~'~.::,~,.~,,,:,, ~,-, ,~,,~,~,~ ~,~. ~..,,~.~.,~: ~,~,~ ~,,.~ ~.,,. ~, =.~.,.~. ,~,, ~,~,~..~ ,~.: .,~,~ .,~,,. ~..... _ ~ ,,. ~,~. ~.,,~ ~.~.. ,~.. :,~ ~ ~,~ ,~ ~-.~ ~ - .......................................................................................... ~ ............................................... .~.~```~.`~.`~..`~`~`~`~.~``~..~.~.~`~`~.~.`~`~`~.`~.~`~;~.~.`~``~.~.~.~`~`~`~`~.~..~`~``..~`~`.~`~`~.~.~;.~`~`.~```.~.``~.~`~``~;.~..~.~`~...`...``~.`~`.``~``~.`~`~.~.~''~ ........................... o';--'~--'o ~-'""~-';"-~ ........... 1'~- ~ ~ o, ~ ,"~:~' ~:~'~.%';"-'::0-,"-0~ .................. ~"5"Z0" .................. Z'~"'~'2 ................. '~"~";'"~ ...................................... ...... 3-~-7'~'-'; ............................. ~'"8'-;'-Z .................. ="~-3-';'"~ ..................... -T'O"T'~' ........................ ~':~-ZO ................... TO"S"~'"~ .......................... ZZ~'"O ............................. O"-;'"T'~ 7,"'7 ..................... ~ ,"-o ........................... :' T 70'~"0:~' ................... '~"T"~"~- ..................... '~'-Z~ ................... ~'";"~ ........................................ ~;~``~`~Z`Z~`~`~```~`~L~Lj~L~ZL~%~.~:~`~S~.~}~:~%L~%~..~S:`~:~:.:;.~;~`~;`9`.;' ~:~%~ ;~>SS~? ~ ~L.Z:'~.z~ ~%.~,~.~.,~ZZ~.~;.~ ~`~````~S:~%~z~L`~`-.`.~`W``~``~`:```~.&~`~`:``Z`L`;`L~````~2`````~ ................... ~.~,.....Z ............................................................................................................................................................ ~LL WESTERN E&P INC. 414-11 38'98. 53.6 -121.7 8.9 25.7 104.0 2.29 0.05 11.2 ~.? ,~.1 391~. 50,2 -129./, 9.0 27.7 103.1 2.29 0.07' 12.0 lO.,g 10.1 3938. 59,1 -12.5.8 9.0 25.0 101.1 2.30 0.07 11 .3 10.~ 10.2 3'~58 · 56.0 -135.0 '?.4 26.4 104.2 2.2~ 0.06 11.6 10.2 3978. 55.~ -101.7 10.7 ~.~ I 26.~ I .69 0.02 29.0 22.~ 1 39~8. 90.~ -68.7 11.3 33.1 9&.~ 2.50 0.11 8.5 6.0 4018. ~6.4 -69.9 11.0 29.0 96.5 2.43 0.08 6.6 ~.~ 5.9 ~038. 97,5 -6~.3 tt.3 34.6 99.7 2.45 0.I~ 8.2 7.9 :5.1 b058. 99,9 -63.4 11.2 34.2 90.6 2.41 0.07 16.5 13.0 14.0 4078. ~5.0 -66.2 10.~ 24.5 ~9.1 2.49 0.17 13.3 16.1 1~.5 9 7.6 7.5 ..~:1 6' .,"13.4 1~.4 411 8, 91.1 -5 "?~:~'7', ~ ~"'~'~"~"~' ....................... 9.4 2.S 1Z.3 ~ . ~ - 6 4.6 1 1 · 1 3 6. 1 0 5 · 1 Z · S 2 0 . i' ............................ T"O"7"~ .......................... ~',"& .............. ~"', ~ b238. ~5.3 -65.0 10,6 30.1 92.0 2,49 0.07 8.6 8.7 ~.~ 425.~. 32.6 -52,2 10.5 52.6 126,2 I .59 -0.01 230.0 71 .~ 57.7 427~, 52.5 -56.7 10.~ 43.Z 123.6 1.66 0.02 6C.3 23.S 30.c '~'?~:¥:;~:~'-~'"2 ............ ~"-'T'T'~"~ .......................... ~";"~ .................... eLL WESTmRN,.. E&P ~'NC. V ~418. ~3.6 -~9.~ 10.2 31 .~ 87.3 2.62 0.09 9.2 5.2 O. 1 ? 8.? 8.1 8.0 4458, 91,6 -48,1 10,2 30,2 87,9 2,~2 0.09 8,0 7.3 7.6 4478. 5&.9 -49. :3 10.2 38.7 97.1 2.16 0.17 13.2 10.1 11 .2 45~8. 59.1 -49.~ 11,] 25,5 102.0 2,~9 0.15 7,6 7.2 7.5 4558. 48 .2 -4~. . 7 10 .9 24 .6 97 .5 2 .37 0 .18 7 .8. 8 · 3 :,'~ · ~ 7.6 7.5 7.7 4578. 73.8 -4 10 9 33.2 98.5 2.39 6 0 6.2 ~.7 42.9 43.6 45 8. 74 0 -4 7.4 7.~ 6.3 6.2 46 6.5 5.8 4.9 5.1 8. 4 .2 4 6.2 6.3 ~ 4.7 - 6 8 1 6.5 '1'?';' '5 ........... i6; 2 46 .6 -45.4 10.6 '9.6 89.2 .61 O. r .3 .4 6.6 ~:: ::7'"'E'70'~'~ :'~::'" ' 7":"C: '~":':~' ............................ ~'";-'2 .................. ;";'3 ...................... 7'7 ...... :::""7"': ~ 7:'~:77":~';"]:~7'~'":'::~:';~-:'7"; ....... ~:";"~ ............. : ......... ~";"2 ............................... ::7" ? ~% :~.~ ,~: .~,~m;~:~ ,~%~.~.~%~,~ .;~%7' ~.:-..~.~.,:.::.:~m~?~:~,,:...,,~-~:,S,~, ~,,~72~:?~.. ~:~,'.:%7L,~,.. ~'~'~'?Z~' -~;, :..,."~., ,,.,:::~.,,~:,~,~ ...... ',7~.~,~T~% T?'t~ ........ ?'-~ ......... - .................................................................... ~ ....... ~ ?;~T';'70)7~7~:7'::7:':":~:';"0; ....... ~;': ......... %"-¢" .......... '~"~'3--8-"; ............................. 7-'~-";-O .................. ";'~"'T;'-~ ...................... 'T0";'-'~' .......................... 2"7';-'~' .......................... 8-'S"-;'-0 ............................. Z~'"5'~ ............................. 0";'-'1"'0 ............................... ~";-9 '5 7';'3 eLL ~r'ST=RN E&P INC V 41,4-11. &858. 77.0 -65.3 10.0 25.3 96.5 2.47, 0.09 11.7 11.5 11.6 4878, 43.5 -79.0 9.3 21.4 103.4 2.34 0.07 15.4 15.3 1~.5 0.06 14,5 14.5 15.2 4898. 38.8 -73.0 9.7 21.3 83.& 2.32 0.06 12.7 13.0 11 .3 ~:~'=~'~' ~?~%"~7 ~ ~ ~; ........... :::': ......... F'":::"'~ ........ : ................... F~'''~'~ ................... ~ ............. ~::~:~ : ~:~.: ~ ~;:':~'~z z~.~:~:~· ..................... :!._,~,.,~? ................ ~..,.0.~,..~ 0..?,.: ........................................ 4918. 53.6 -52.5 11.2 26.3 82.3 2.44 0.11 5.5 4.6 5.1 ~?~'~:~i ~~:~ ~ ~'~:~ i:~'~F~'~r' -' "~ ""' ::'?7'"'?:"F'" ':-'"-'7'~ ............. ' ............... : ........... :"~'"'~ .............................................. ~.2~8~':~:~:~ .;-. ~:.~:..~?.~?:...:::~~.~c~.~:~'~?~:~. 0,13 5 · 6 ,, 2 5,0 4938, 37,3 -53,1 11,1 21,5 90,6 2.49 0,10 6.6 6.7 ~.~ 4958, 72,0 -5~,1 10,7 35,2 96,0 1.93 0.19 18.9 tl,9 13.1 4978, 78,2 -77,5 10,3 24, 4 9Z, 7 2, C2 O, 08 14,4 14, 2 1 4.1 4998. 61.1 -83.5 ~.8 22.9 104.6 2.36 0.06 15.5 15.7 le.6 ~: ~' ......................... ~-';'"~' ................... ~ 5018, 63,5 -55,~ 11 .5 32.8 ~4,2 2,~5 0,13 6,3 6.0 5.7 5038. 98.9 -57,6 11,1 29,5 83.7 2.58 0.0~ 11 .~ 7.9 ~.0 5058, 87,7 -7' 9 6 23.9 86.9 2.46 5078 64 2 6 5098. 91.6 -5 11,4 8,8 8,9 10,7 10.5 9.~. 10,0 '9,7 ;., 8.9 ~...~ 22,1 18,6 7.7 7.~ ,3 7 . 8 9.4 0.11 27'.3 5198. ~5.2 -62.0 9.5 25.1 74.2 2.54 0.04 11.3 "'70"';'-0-?' .................. Y:%"? ,:LL~ WE, STERN E&-~ ]:NC., v ~ 4,1 A-1 1~ ' c: 537~. 3S.1 -60.0 9.8 21 .2 75.4 2.:S0 0.08 6.3 ~.5 6.1 5398. 43.7 -60.9 11,1 22.4 81,4 2.S1 0.08 6.0 5.7 5.8 ............ '1'3';"7 ................ ~18, 76.1 -61,~ 9.9 48.~ 122,1 1.75 -0,03 39.0 21 .:~ 23.2 5~38. 46.8 -96.8 .8.9 24,8 96,7 2,36 0.10 12.5 10.1 9.0 '~ ":'":"~ ;' :~'~":~ ......... ':"i-~"~'; ~- .................. ~'~-';'"'~ .............. ~"-~V7 ~,:,~::,~,~ ,.~:~:~:~L,cZ~c:::,~:::~: _:.:~.:.:~i:~:~.~ .~.~.:~:~::::: ~:,~::~:~,~::,,~:~1~ :~,~:~:~.:~Li~:~:~:,~:~ ::~:~i~ ~:~L:::~.~::~.:~J:.~ 'L.(~:~:~ .............. %...,,: ....................................................................... 547~. 90.0 -61.~ 9.3 2S.9 ~6.8 2.51 0.13 ~.~ ,~.3 ,'~', . 1 ~:,:::~:~,?.~ ~....~ '~??..~:~:~:~:~ ~ :~:~.~O~;~:..':~:~:~T 9 1 1 · ~ 1 0.2 ~. 2 5498, 44,8 -97,8 8,7 23.4 89.~ 2.39 0.0:~ 15.3 11 .9 10,4 ~518, 4~,3 -99,3 8.9 23,4 90.6 2,33 0.07 1~,3 12.2 11 .1 1 ~ .3 1 2. 1 1.0 ~38, 54 1~.5 9.C 10.1 555~. t 10,7 10,7 0,7 62,4 $5 22,4 2~&,O 5598. 8.3 ;5,4 3 5.638. ?7.4 -74.6 10.5 26.6 ~.0 2.53 0.13 11 ,6 ~.1 9.3 5678 101 9 -73 1 11 5 32 1 81 8 2 53 0 12 ~ ~ 7 ~ 7 2 ~698. 72.3 -71.2 11.2 27.2 81.9 2.48 0.10 6.6 5.~ S.7 ~:~'~'~"~:::=~.~;:~':.~.::~:~: ?~: ?h%:;~:~.?~:~.:~::~:~=? :~;~.~"~.?~,:..~:,~::~.;.? ,~;:.:=~;?..~u:~::~.;~;~ :?~?~: ~ ::: L L~:~ :. ,.~:: .~ ~ :~ ,~ .:~::::~ ~: ~, :~: .~ ~:~L~.: ;; ~:.~; ;~::~:~, ~:.~:~ ~: ~ ~ ~ ~ ~.~: ~ ~ ~,~ ~: ~L:.&~ ~ ~: ~ ~:L ~:~:,~ ~:~:~c ~:~. :~:~:~ ~ ~:,~ ~ ::~ Z ~:~ ~ ~ ~.~:~J:~ ~c~.~:~ ~ :~:~ ~:,~. ~ ~ D~:~ L~: ~ ~5~,.d~ ~L....5. ~ .::~:~.~ .L: ~... :~.~,~ ~:~ ... ~ L.:.~ :: .~ .. :.~L. :,, ..;: (..; L:., L.... ::,,, :.. :: ~ .~. :_ .:....; ~, ::. ,; ................. :..,,,,:: ........... : .......... ~. . ~/-t -1 / ,~6 TIME: 157527 ,:LL,. W~STERN E6m INC. fi 41A-11~ 5818. 46.2 -109.1 8.7 1~.4 79.7 2.C5 0.08 31.5 2c.9 ~3.6 5838. ~6.~ -111.2 8.,~ 18.8 81.9 2.45 0.0~ ~.1 20.4 .~'::'~':::~"~:~' ?,~..,: :::., ~.~.~:~:~:~:.~:::: -,::. ,~ ~: :~, ~ ~, ~:,: ,~: ,: ~,,,: ~:~:~:~.:~ ~:: ~:~..,, ,? ~: ,.: ::::?~ ~,: :,,:,:: :~,~ ~ ~,~: ,? ::: ':~ ~? ,:: ~ T: ~ ~,:~?:.: ~?: T,?: :~ :,: ~:: ? ~.-.:,~ ~ ~, ~, ?~-: ~ ~,: ::: ~:, :,-: :~,~: ;~ :-~ ::: ,.:: ..~: ~::--:.-. 2;~:":: ::~O:"": "'~ .......................................................................................... 0 · 10 25 · ~- ¢ 1 9.2 5~58. 36.9 -123.3 ~.7 17,4 7~.5 2.43 0.0~ 33.7 ~3.6 5878. 60.~ -99.7 9.4 21.4 75.2 2.51 2.06 3g.9 21 .2 ~.7 s~90. 100.3 -75.6 10.3 ~.3 76.3 2.59 0.14 13.0 10.5 IO.s 5918. 51.5 -112.5 9.S 22.7 87.9 2.3~ 0.06 17.6 13.2 tl ~:~:: ::: -:":'"'~'-~'3'"0~ .................. ~-"~-'~'"~ ................... ~UT:~' .................. 5938. 5~.7 -113.9 9.6 2~.~ 8~.6 2.35 0.~ 15.3 1~.C 9.3 5958. 39.9 -112.0 9.6 21.2 86.8 2.38 O.~S la.S 12.3 1'2.7 5978. :9.0 -78.2 11.9 44.7 1!2.~ 2.71 0.1~ 15.2 11 .Z 11 :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ~:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ........... :..,:...0...?.....~....~ .............................. ~,..~..,..~ ........................... ~..,.z . 5998. 67.9 -84.4 10.6 25.9 80.1 2.49 D.09 10.1 9.2 ;7.5 23.1 2~.5 6018. 100.7 -7 10 I 27.0 78.2 2.58 1~.1 1~.S 13.0 13.6 12.9 6038 99 5 ~ i":3"' ~ ........... i '~"'.'~ 10.~ 11 Z O. 6 I 21.1 17.9 6 0 Z 8 ·7 5 · 5- 8 ':"'"" "~'"~'"~'i ......... ~.'::Z::': .:'~-'0-;' 7 ................. 4 5;:. C 40. 9 55 . :~!:;, ::::::::::::::::::::::::::::: :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: ============================================================================ :~::Z',S::~: ):~::: ,Z:~::,c:::.~..:.;:2:::: .:,:.:,:.:.,.:Z.:,.: ._-i.:~,:.. ,..: 6158. 51.4 -146.: 8.6 17.6 97.2 2.35 0.07 30.2 10.5 17.T ;;~ ;::: i :': '~: ~- . ~;~6777' ; "::(; :':;~' :~; ;~.--:;;);~' ;:~;" ;:~*'." ';::. ;:;':' ~ -~:;5~;;~::;: . ~:::;~i~::;'.:;';:~;:~;~:g; :';~;:~::~:: ~:: '::;:;~(~.;;:~;::... :.:~:. "::"~::'~';) ;'' :~*:.. :-:'; '%.': ._' ~:::~;' ::'-;, ;;.::.~: { ~ ~t8. ~1.7 -152.Z 8.6 t4.~ 82.3 2.46 ~.3~ 38.6 26.6 · ::: · ..:s::. ·: ::-?.. ::?:s~. .::- :;:. ::::.::s s::?:;.:- :..::..-.--:::-..:.-.?..-:.-:-: :c; .. :: - :: :'::::.:..::::::::.:',::.':.':',',::'."-:7, -""::"'"-'"'": "-:'" ::: T::::'-':':: '-:' :.: ": '. ,: .' '::', '.' , ~/11/5~ TIME: 15:52: ,eLL WE..STERN E.~P ZNC, A z, 1A-11. 6298. 10.5.2 -77.7 10.2 26.2 76.8 2.53 '3.07 11 .Z+ .0.5 ;~:~:z~.~':{~:'~.z~pz._,~~'~.z~:.~ /~?~?.:~, ................. :~..,_.!..~ ..................... .!.~..,2 ...................... ~..._:a~..~ .............................................. 6318. 57.4 -119.3 9.~ 23.3 88.6 2.37 0.11 12.8 8.0 ~..9 6338. 45.8 -118.~ 10.0 17.8 8~.~ 2.42 0.~4 15.7 11.2 10.3 6358. ~2.5 -78.2 10.9 26.0 80.5 2.42 0.15 9.5 8.3 ::~:~:~? ......... :'"~'O'-2T~ ................. -~-T'27 .................... '¥i'-;'? ................. 'i'T;-'; ....................................... 6378. 50.4 -114.5 11.6 21.~ 86.3 2.41 0.12 ~.1 ,~,.8 8.7 :~'~::.~:.~.~.~{~.~.~:?..~,~? ,~ ~?~:~S~.~.:?`~.~:9~.9~..~.~?.~:~.~.:~.~.~.~.~::~2~:`~ ~::._.._.,._.?._~_,~_~ ...................... ~..~.,?..a ..................... ~,..~.,.d ................. Z?_.~ ..................................... .~398. 103.8 -7~.3 10.2 26.0 75.8 2.66 0.16 10.4 9.~ 8.7 6418. 47.8 -108.3 10.6 20.7 86.5 2.35 0.14 11.9 11.2 19. ¥~;~: ? ........ '""O-';"fO ................... 2"~";"'2' ................. 2"0";"0 .................. 20";"i ......................................... 6438. 49.6 -103.7 10.9 19.2 82.1 2.46 0.13 1~.6 t3.3 13.~ ~58. 121 .4 -83.5 9.6 27.8 81 .8 2.55 0.08 10.9 11 .5 11 .3 ~4~8. 7z.o -7~.~ 9.6 ~.0 ~.z ~.~7 0.14 8.0 ~.1 ~.~ ,0 .8 6498 79 9 7 9 5 26 , 2 75 . 6 Z , .50 ~-';'"'~:~";'"'~ ~""~' 'Tf';'0 .................. i"i""'; '~' ........................................ 6 51 8 . 5 9 . 5 -9 1'-'~' ;'"4 ......... i'5-;-o -TT';-'i' ............ '~'"i";'"0 ............................... . ~ ~, ~ ..... 2'-0-;'0 .................. z'-3";"s' ...................................... 8. ~"i; '2 i"'2 '~;'~ ;--8' .................. Z6';'~ ................................. 8 2 9.9 2"~' ;':~ 2'~", 0,1~ 39',0 ~,U~ ....................... ~,' .......... ~ ......................................... '0'";'-"'~'-'"~ ............... ~ .............. ~-'~'";"-~ ............ 2'~'";s ...... ~"~ ~ ~ ........................................ ~: ::"':::e"';-:o:;~ ............ ;%"~ .................. '~'o';-'~ .................... ~-~"';-~ ...................................... ::~ ?~:::"T':O:TfO ............... '~"T'2~ ................. ~'%"~ .................... 3'-5';'~ .......................................... 6638, 46,7 -97,5 10,1 17,9 86,9 2.39 0.06 43.9 37.Z 38.0 ?'?0-;O7 .... :':'"'"'2"~'-';-0 ............... '2¥;'--~ ................ 2"~";"~' .................................. ~ ...... '~??¥; .................. .......... ~?';? ................. ~¥07~ ............................. '~%~'%~ ................. ~%'~:~ ..................... ~:;:~'~ ......................... -z;'~'::~-8' ............................ ~'";-'o"? ............................. ¥~'"';--'~' ...................... ~'"~'",z ~"~";' %;'~; ?F?;~:;:"'~F~'7: :.:' ........ O-;'-f'~ .............. ~%-'2~' ................. T~";"i ................. ~"'~'";"'~ ......................................... ,~%.?~?``~.~.~`~`~`~.~?~.~.~i~?~.~~?~~ ??-~'~'~'~'~=?f?~ ........... ~'~-~'~%%~"~' ........... ................. o"';--'~'-o ........................... ~'"'~-";'"'~ ................... ~-'"~', o~ .... -~ ~.-.-~...;..~:.?_ .................. -~..~¥~. .............. _~_.~.;..~_ ................ ~-~--.~-.~ ................................ ~-..:~:.?~t.~:{~ ~.}~::::.:.}:::?/~:'~S7%:~ ?:~.~ :~-}7~:~..~:~?.,:~. ~' ~..~???:~.~ :' ~}:~?:~%~~:::?.:~}~:. ~}~::'~}}~:.: '~'::.?~?:~::~.~'i~?}~':~.::/} :':~'~ X?'~?~"i~%~S~:?:77~"[7:"~:"~S~:'~::':'~~:~:.~::~O_ · ' _ ........ '0,7':'"'"~' ~ y ..................... Z~"'"~5 ........, O~ ............................................................................................................... 1 9, 3 1 ~, 1 '~-?"5"8"'; ....................... '%5¥7 ................. ~'-8"2'--;3 ............................ :~--;'"'] ........................ 2-2-¥?' ..................... '-8-'O';"~ ................................ 2"T'~'? .............................. 0'";""f~ ............................. ~"~'";'~ Z"0';'"~ ~ 9',7 · 4Ilt186 TINE: 15:52: 8. ,:LL W~STERN E~P INC. V A 4.1',~- 11 " 8 ? ~?:f~ ~ ;7 ~"~.; ,;~,7:~-,---¥,:: ............................................... ~--,~.-,~-z,-~ .............. 0'"~'~~: q ....... O'~z~ ...................................... ~,Z ZZ Z,TZ' Z~;.~. ~ ;.'~.~','~'~,' 6778. 95.0 -46.9 9.6 27.7 79.1 2.57 0.13 9.1 6.1 5.~ .... '~?'~'~/: ......................... ~%'0 ............ :¥Z'2~~ ..................... ¥7~" ................ Y-~';¥ ........................ ~'~'~';-~' ................... '2-';-¥~ ......................... ¥;-'o'"&' ........................ ¥~-';-'q- ..................... 6~18. 71,2 -66.9 11.3 23.1 78.8 2.4~ 0.19 21 .4 20.~ 21 6838. 101.1 -45.9 9.3 27.9 80.9 2.~9 0.07 15.4 11 .S 11 .7 6858. 48.8 -78.3 9.0 ~1.0 ~4.9 ~.41 0.12 36.3 6878. 49.3 -77.6 9.0 23.1 90.0 2.38 0.11 22.8 22.2 ~3.) 6~98. 104.9 -49.5 9.~ 24.9 75.5 2.63 0.16 12.~ 12.0 11.2 6918. 67.2 -51.7 9.3 21.8 83.2 2.44 0.09 13.7 11 .6 10.9 5938. 48.5 -61,6 9.9 9.8 62.4 2.56 0.26 53.1 36.7 28.~ 695.8, ~9,6 -63,4 9,5 19,9 91,0 2,37 0.09 20.4 18.5 1'~.~ 0 6.4 ~.5 6978, 53 3 -7 8 9 20,2 90,2 2,41 23.5 19.3 15.~ 24,3 22.7 6998, 45 ~ 5 35.9 27,7 29.~ ~018 85 0 -4 7098. 73.B -38.7 9.3 23.5 80.~ 2.56 0.18 6.3 5.~ 5.1 7138. 5~.1 -~0.4 8.9 JS.0 78.9 ~,56 O.JJ 10.1 g.5 9,~ 7178, ~S.5 -78,1 8.6 15.~ 78.0 2,47 0.38 27.~ 21 .o 2~.1 ..... ~.~ ~ ~' ~-~:~-~ ~'~-~-~-~r'~-~'~'-~:~ ........ ~ ............ r .................... ~ .............................................. ~ ..................................... ~' ....................................... ~4T=: 4/11/$6 TIME: 15'52: 8 ~SHELL W~STERN =&P INC v · ~'.~". ~:~:'~: ~. :. ~.--~-~-"~-.- ~ ~ ~ ~ T >~i;'~ 9~:s~:Y'~'7":'"]l~;"~]~;~'",2;iy'~"~ i'~'~i~:~" '7 r "I~]~'~?;~T"~'~9 ~'~"~"~ ~ ~1~ZL~i~? T']~"~s~'~'~? ~i'~}~?~:~'~?~ S~i;~:';'~21'i~?'~ :'~?TY'q~ ;.~f '~ ?~?'?~'??~?~ ?:'r "~7~rYq'"'"':';~r T;~2~;r'2'-? '~ ~" ?i? ?T'~"'""C'"'~i: ............. '~ ................. i .............................................................................................................................................................................................. ~?~ ~ M7 C ~ 0 H M - M 0 H M - M 0 H M - M ~,~?::~3:377~"'~'~F:'~r ?~'~?'"-~T~q'L'~3'"~?:~:~;~:'~- '~L~D3~ -~'~; 3 ~Z37~'T Z f. ~ 3~"~3~3 F~'~3'D~ D ~:' ~ ~"T~ ~' ~:~ z:? 'r ~-'-DT:::~ ~--~ C ~:~ r::: ':~'"~'~ ~ ~:F;3 D~ C'~L ~ ~D:~ ?~'T Z ~' 3~'~ 'D:' z'-"~c ~ ~:~]'F :"-z":2: ~7' '2'""'--~~ '-'? Z'~ ~'7'z ] ~":Ti i":- ........... ': ............................ ~ ........................... 7278, ~5,7 -67,9 8,9 16,8 72.3 2,47 0.09 49.5 50.1 57.7 ~;~:::'~::'~:"~;;'~?~'~;~??_:: _.~2:~ ..:::~ ..~..~.~::::. ..........: ~:~:: ::.~ ::::~::.~ ~..~.~:~:~.~..:.~.~:~:~:~.:~:.~.~.:~.~::::~8~";~.~:.~.:..:~:~;~.~:~:~:.~:~:~:~8~:"~.~:~;:~:~?~???~?~:~T~f~ ~:~;::;:~:~:~' ~:~'~::~'~:~?r:~:~:~::~:~?c:T~::'',':':;~':''''':~':'';::'''''?~'~':'''''-2-. 50 ': ........... :"~u ....., '~1 ........ 6' ........................... '~'?'"~-c .......................... 5 ~'"'~'. '~ 2 21.0~' ............................................. 7298, 74,5 -42,3 8,7 Z7.3 91,8 2.62 0.21 10.5 7.7 7318, 69,4 -42,9 8,6 27.4 81,2 4,46 3,38 ~.4 ,5.6 ~.2 7338, 69,4 -28,6 ~,6 26.0 110,7 2.17 0,17 13.3 a,~ ~.6 ............................. ............................. ............. 7358, 39,7 -43,5 7,7 23.~ 76,9 2.51 0.19 10.2 10.5 10.4 ...........................................................................................................................................